Company|Quote|Line|F_Line|Comment|Loc
01|1|2|1|A tariff surcharge of 8% will be added to every order|Y
01|1|2|2|placed after September 1st 2025(until further notice).|Y
01|1|2|3|This surcharge will be acknowledged upon acceptance|Y
01|1|2|4|of every order.|Y
01|2|1|1|s/n 12345  Ready in 2 weeks|Y
01|2|1|2|let's use rebuilt table|N
01|2|11|1|For Lefty Table Only|N
01|2|13|1|Pick Air or Hydraulic Supply|N
01|2|17|1|Made in Taiwan. Crank Type|N
01|2|18|1|Item is not in stock. ETA to Lyndex-Nikken 7/4/11.|Y
01|2|19|1|Confirm pitch between CNC to TAT|N
01|2|24|1|Make sure to sell with X-6B|N
01|2|27|1|Nikken Made Dead Length Front Actuate|N
01|2|28|1|US Made Rear Actuate Crank Style|N
01|2|30|1|US Made with Air switch|N
01|2|33|1|Works for Air or Hyd|N
01|2|46|1|Kaz to install. cost $5000|N
01|2|46|2|Includes Hotel airplane ticket.....|N
01|2|48|1|DMG Mori with DDR Drive Unit|Y
01|2|50|1|AA21 Installation|N
01|2|52|1|$1000 tooling certificate included|Y
01|6|9|1|Estimated time of arrival to Lyndex-Nikken 5/18/11|Y
01|6|9|1|Estimated time of arrival to Lyndex-Nikken 6/3/11.|Y
01|6|15|1|Three pieces in stock. Estimated time of arrival to|Y
01|6|15|2|Lyndex-Nikken is 6/6/11.|Y
01|6|23|1|2 pieces in stock. Estimated time of arrival to|Y
01|6|23|2|Lyndex-Nikken 6/3/11.|Y
01|6|33|1|Estimated delivery to Lyndex-Nikken 5/18/11.|Y
01|6|35|1|Estimated date of delivery to Lyndex-Nikken 5/18/11.|Y
01|17|12|1|PART # TCE-95947-XXXXR|Y
01|17|12|2|Length TBD depending on application|Y
01|17|13|1|Part # TCE-95951-XXXXR|Y
01|17|13|2|Length TBD depending on application|Y
01|18|15|1|Part #TCE-95947-XXXXR|Y
01|18|15|2|Length TBD depending on application|Y
01|18|16|1|Part # TCE-95951-XXXXR|Y
01|18|16|2|Length TBD depending on application|Y
01|19|10|1|Part # TCE-95947-XXXXR|Y
01|19|10|2|Length TBD depending on Applicaiton|Y
01|19|11|1|Part # TCE-95951-XXXXR|Y
01|19|11|2|Length TBD depending on Application|Y
01|20|9|1|PART # TCE-95947-XXXXR|Y
01|20|9|2|LENGTH TBD DEPNEDING ON LENGTH|Y
01|20|10|1|PART # TCE-95951-XXXXR|Y
01|20|10|2|LENGTH TBD DEPDNING ON APPLICATION|Y
01|21|3|1|PART # TCE-95947-XXXXR|Y
01|21|3|2|LENGTH TBD DEPENDING ON APPLICATION|Y
01|21|4|1|PART # TCE-95951-XXXXR|Y
01|21|4|2|LENGTH TBD DEPENDING ON APPLICATION|Y
01|22|3|1|PART # TCE-95947-XXXXR|Y
01|22|3|2|LENGTH TBD DEPENDING ON APPLICATION|Y
01|22|4|1|PART # TCE-95951-XXXXR|Y
01|22|4|2|LENGTH TBD DEPDNING ON APPLICATION|Y
01|23|2|1|PART # TCE-95947-XXXXR|Y
01|23|2|2|LENGTH TBD DEPENDING ON APPLICATION|Y
01|23|3|1|PART # TCE-95951-XXXXR|Y
01|23|3|2|LENGTH TBD DEPENDING ON APPLICATION|Y
01|24|2|1|PART # TCE-95947-XXXXR|Y
01|24|2|2|LENGTH TBD|Y
01|24|3|1|PART # TCE-95951-XXXXR|Y
01|24|3|2|LENGTH TBD|Y
01|24|4|1|PART # TCE-95948-XXXXT|Y
01|24|4|2|LENGTH TBD|Y
01|24|5|1|PART # TCE-95952-XXXXT|Y
01|24|5|2|LENGTH TBD|Y
01|25|2|1|PART # TCE-95947-XXXXR|Y
01|25|2|2|LENGTH TBD|Y
01|25|3|1|PART # TCE-95951-XXXXR|Y
01|25|3|2|LENGTH TBD|Y
01|25|4|1|PART # TCE-95948-XXXXT|Y
01|25|4|2|LENGTH TBD|Y
01|25|5|1|PART # TCE-95952-XXXXT|Y
01|25|5|2|LENGTH TBD|Y
01|26|2|1|PART # TCE-95947-XXXXR|Y
01|26|2|2|LENGTH TBD|Y
01|26|3|1|PART # TCE-95951-XXXXR|Y
01|26|3|2|LENGTH TBD|Y
01|26|4|1|PART # TCE-95948-XXXXT|Y
01|26|4|2|LENGTH TBD|Y
01|26|5|1|PART # TCE-95952-XXXXT|Y
01|26|5|2|LENGTH TBD|Y
01|27|3|1|PART # TCE-95947-XXXXR|Y
01|27|3|2|LENGTH TBD|Y
01|27|4|1|PART # TCE-95951-XXXXR|Y
01|27|4|2|LENGTH TBD|Y
01|27|5|1|PART # TCE-95948-XXXXT|Y
01|27|5|2|LENGTH TBD|Y
01|27|6|1|PART # TCE-95952-XXXXT|Y
01|27|6|2|LENGTH TBD|Y
01|28|3|1|PART # TCE-95947-XXXXR|Y
01|28|3|2|LENGTH TBD|Y
01|28|4|1|PART # TCE-95951-XXXXR|Y
01|28|4|2|LENGTH TBD|Y
01|28|5|1|PART # TCE-95948-XXXXT|Y
01|28|5|2|LENGTH TBD|Y
01|28|6|1|PART # TCE-95952-XXXXT|Y
01|28|6|2|LENGTH TBD|Y
01|28|7|1|2 PCS FOR 5AX-2MT|Y
01|28|7|2|4 PCS FOR 5AX-4MT|Y
01|28|8|1|2 PCS FOR 5AX-2MT|Y
01|28|8|2|4 PCS FOR 5AX-4MT|Y
01|28|9|1|2 PCS FOR 5AX-2MT|Y
01|28|9|2|4 PCS FOR 5AX-4MT|Y
01|28|10|1|For 5AX-4MT 24V|Y
01|28|11|1|FOR 5AX-4MT 110V|Y
01|29|28|1|Standard|Y
01|29|29|1|Standard|Y
01|29|30|1|High Speed|Y
01|29|31|1|High Speed|Y
01|32|1|1|A2/5000i Fanuc Motor|Y
01|32|1|2|Model # A06B-2205-B000|Y
01|33|1|1|Alpha 4/5000i Servo Motor|Y
01|33|1|2|Part # A06B-2223-B000|Y
01|34|1|1|Alpha 4/5000i Servo Motor|Y
01|34|1|2|Part # A06B-2223-B000|Y
01|35|1|1|Alpha 4/5000i Servo Motor|Y
01|35|1|2|Part # A06B-2223-B000|Y
01|36|1|1|Alpha 2/5000i Servo Motor|Y
01|36|1|2|Part # A06B-2205-B000|Y
01|37|1|1|Alpha 4/5000i Servo Motor|Y
01|37|1|2|Part # A06B-2223-B000|Y
01|38|1|1|Alpha 4/5000i Servo Motor|Y
01|38|1|2|Part # A06B-2223-B000|Y
01|39|1|1|Alpha 4/5000i Servo Motor|Y
01|39|1|2|Part # A06B-2223-B000|Y
01|40|1|1|Alpha 2/5000i Servo Motor|Y
01|40|1|2|Part # A06B-2205-B000|Y
01|41|1|1|Alpha 2/5000i Servo Motor|Y
01|41|1|2|Part # A06B-2205-B000|Y
01|42|1|1|Alpha 4/5000i Motor|Y
01|42|1|2|Part # A06B-2223-B000|Y
01|43|1|1|Alpha 4/5000i Servo Motor - Part # A06B-2223-B000|Y
01|44|1|1|Alpha 4/5000i Servo Motor - Part # A06B-2223-B000|Y
01|45|1|1|Alpha 2/5000i Servo Motor - Part # A06B-2205-B000|Y
01|46|1|1|Alpha 2/5000i Servo Motor - Part # A06B-2205-B000|Y
01|47|1|1|Alpha 4/5000i Servo Motor - Part # A06B-2223-B000|Y
01|48|1|1|Alpha 2/5000i Servo Motor|Y
01|48|1|2|Part # A06B-2205-B000|Y
01|49|1|1|Alpha 2/5000i Servo Motor|Y
01|49|1|2|Part # A06B-2205-B000|Y
01|50|1|1|Alpha 4/5000i Servo Motor|Y
01|50|1|2|Part # A06B-2223-B000|Y
01|51|1|1|Alpha 4/5000i Servo Motor|Y
01|51|1|2|Part # A06B-2223-B000|Y
01|52|1|1|Alpha 4/5000i Servo Motor|Y
01|52|1|2|Part # A06B-2223-B000|Y
01|53|1|1|Rotary Motor:  AiS2 A06B-2212-B000|Y
01|53|1|2|Tilt Motor:  Ais2 A06B-2212-B000|Y
01|54|1|1|Rotary Motor:  AiF2 A06B-0205-B000|Y
01|54|1|2|Tilt Motor:  AiF2 A06B-0205-B000|Y
01|55|1|1|Rotary Motor:  AiF2 A06B-0205-B000|Y
01|55|1|2|Tilt Motor:  AiS4 A06B-2215-B000|Y
01|56|1|1|Rotary Motor:  AiF2 A06B-0205-B000|Y
01|56|1|2|Tilt Motor:  AiF2 A06B-0205-B000|Y
01|57|1|1|Rotary Motor:  AiF8 A06B-2227-B000|Y
01|57|1|2|Tilt Motor:  AiF4 A06B-2223-B000|Y
01|57|1|3|** Pricing includes Hyd Tank listed below **|Y
01|58|1|1|Table comes with Direct Mount 5M Cables for Robodrill|Y
01|58|1|2|Specification.  Air Line also included with Cable|Y
01|58|1|3|DiS60/400 Motor with AiCz Sensor 512A|Y
01|59|1|1|Table Comes with Direct Mount 5M interface Cables|Y
01|59|1|2|And airline specific to Robodrill setup.|Y
01|59|1|3|Motor is DiS150/300 with AiCz Sensor 512A|Y
01|60|1|1|Table comes with Direct Mount 5M Inteface Cables and|Y
01|60|1|2|Airline specific for Robodrill Setup|Y
01|60|1|3|DiS150/300 Motor with encoder AiCz 512A Sensor|Y
01|61|1|1|Table will come with Direct Mount Cables and Airline|Y
01|61|1|2|Specific to Robodrill Setup|Y
01|61|1|3|Rotary:  DiS15/1000 with MPRZ-536A Encoder|Y
01|61|1|4|Tilt:  DiS60/400 with MPRZ-536A Encoder|Y
01|62|1|1|Table will come with Direct Mount Interface Cables|Y
01|62|1|2|and Airline specific to Robodrill Setup|Y
01|62|1|3|Rotary:  DiS60/400 with AiCz 512A|Y
01|62|1|4|Tilt:  DiS150/300 WITH AiCz 512A|Y
01|63|1|1|Table will come with Direct Mount Interface Cables|Y
01|63|1|2|and Airline specific to Robodrill setup.|Y
01|63|1|3|Rotary:  DiS60/400 with AiCz 512A|Y
01|63|1|4|Tilt:  DiS150/300 WITH AiCz 512A|Y
01|2112|6|1|100 pieces in stock today. ETA to Lyndex on balance 12|Y
01|2112|6|2|12/31/11.|Y
01|2118|7|1|This item is a Special Order from Japan -ETA 1-2 weeks|Y
01|2119|1|1|3 pcs in stock delivery on balance is 2 weeks|Y
01|2119|3|1|3 pcs stock delivery on balance is 2 weeks|Y
01|2121|10|1|this item is SK16 sets consists of xxxxx  xxxxx|Y
01|2121|10|2|***  WH : make sure you guys put them together|N
01|2121|10|3|line3 I want Mr. Customer to see|Y
01|2121|10|4|line4 of comment line not to be shown to the customer|N
01|2121|35|1|this item will be available on 9-10-2011|Y
01|2124|1|1|Item above is on b/o and delivery is 2-3 weeks|Y
01|2124|1|2|Old Part Number: OKU-L370-X|Y
01|2124|2|1|Old Part Number: OKU-L370MW-MN|Y
01|2124|3|1|Old Part Number: OKU-L370MW-DB|Y
01|2124|6|1|Item above is on b/o delivery is 2 weeks|Y
01|2126|2|1|This will appear under line # 2|Y
01|2126|4|1|BT50-C1.1/4F-90 (Din Modified)|Y
01|2126|5|1|B5006-20DIN (Din Modified)|Y
01|2130|3|1|this item is slightly used.  extra 10% discount.|Y
01|2133|2|1|We will modify CAT40-SK10-120U|N
01|2137|4|1|1 pc stock balance on backorder = 4-5 weeks|Y
01|2139|1|1|Shipping 8-24-11|Y
01|2139|1|2|Hello|Y
01|2139|3|1|HSK100A-SK10-150P SK10 Hi-Speed Collet Chuck|Y
01|2140|6|1|9 pcs of standard ER32 collets @ no charge|Y
01|2142|4|1|CAT50 3/4 Shell Mill 9GL - NOT AVAILABLE - NO QUOTE|Y
01|2142|7|1|CAT50 1 Shell Mill 9GL -NOT AVAILABLE - NO QUOTE|Y
01|2142|18|1|Please check drawing for this part number as I don't|Y
01|2142|18|2|show a JM31180 (in Jergens listing) but do show a CAT50|Y
01|2142|18|3|JM31118 which crosses to my C50-4500. CONFIRM|Y
01|2149|11|1|Above item may be taken at 40% discount if purchased|Y
01|2149|11|2|with the matching ER25 Collet Chuck.|Y
01|2149|11|3|.|Y
01|2149|11|4|.|Y
01|2149|12|1|Above item may be taken at a 40% discount if purchased|Y
01|2149|12|2|at the same time as the matching ER32 Collet Chuck.|Y
01|2156|1|1|HSK63A-SF0125-3.15B Special Order size|Y
01|2156|2|1|HSK63A-SF0125-6.30B Special Order size|Y
01|2156|11|1|HSK63A-SF3-80B Speical Order Size|Y
01|2156|12|1|HSK63A-SF3-160B Special Order Size|Y
01|2156|19|1|HSK63A-SF4-80B Special Order size|Y
01|2156|20|1|Hsk63A-SF4-160B Special Order size|Y
01|2158|1|1|B5007-0040DIN-M|Y
01|2158|1|2|BT50 ER40 DIN Collet Chuck (Haimer#50.521.40)|Y
01|2158|2|1|B5007-0032DIN-M|Y
01|2158|2|2|BT50 ER32 DIN Collet Chuck (Haimer#50.521.32)|Y
01|2158|3|1|B5017-0016DIN-M|Y
01|2158|3|2|BT50 ER16 DIN Collet Chuck (Haimer#50.522.16)|Y
01|2158|4|1|B5017-0040DIN-M|Y
01|2158|4|2|BT50 ER40 DIN Collet Chuck (Haimer#50.522.40)|Y
01|2158|5|1|B5017-0025DIN-M|Y
01|2158|5|2|BT50 ER25 DIN Collet Chuck (Haimer#50.521.25)|Y
01|2158|6|1|**Note Haimer#50.522.25 not available in Lyndex**|Y
01|2159|10|1|This nut is standard spanner style only!|Y
01|2174|2|1|Need export location in order to quote|Y
01|2174|9|1|The longest gage we offer is 6 as quoted|Y
01|2174|10|1|Need export location in order to quote|Y
01|2179|1|1|This holder is a special advise if quote is needed|Y
01|2183|14|1|Pls confirm whether customer wants this or C4007-0020|Y
01|2183|14|2|as it was a typo on the email. I put both on this quote|Y
01|2184|3|1|Bakers Dozen has been applied to above 3 holders|Y
01|2195|8|1|C50SF-0750-3.15-M-DIN|Y
01|2195|9|1|C50SF-1000-3.94B-M-DIN|Y
01|2196|1|1|B4006-1250-M-DIN (modified)|Y
01|2196|2|1|BT40-SK16-90-M-DIN (modified)|Y
01|2196|6|1|BT40-SK16-120-M-DIN|Y
01|2196|9|1|BT40-SK16-120-M-DIN (modified)|Y
01|2196|13|1|BT40-SK16-90-M-DIN (modified)|Y
01|2196|17|1|B4006-0625-M-DIN (modified)|Y
01|2196|18|1|B4006-1000-M-DIN (modified)|Y
01|2196|19|1|B40S6-1000-M-DIN (modified)|Y
01|2196|20|1|BT40-SK16-90-M-DIN (modified)|Y
01|2216|1|1|HSK100A-SF8-85-M (to be modified with coolant ports)|Y
01|2216|1|2|Delivery for 10 pcs is the end of November|Y
01|2238|2|1|Price reflects Pull Stud Promo Special Pricing **|Y
01|2244|10|1|Note the HSK63A SF 3 & 4 MM holders are No Quote|Y
01|2244|10|2|On the HSK63A Milling Hydraulic holders are No Quote|Y
01|2248|5|1|LABOR CHARGE TO DIN COOLANT BURN ABOVE HOLDERS|Y
01|2259|5|1|Please note above order is a special as stock has|Y
01|2259|5|2|been depleted.|Y
01|2264|6|1|*Note Tool#T-113 is not avaialble in 22mm w/ 100mm gage|Y
01|2264|6|2|*Note Tool#T-114- pls advise what collet chuck needed|Y
01|2280|12|1|C50SF-0750-3.15B-DIN|Y
01|2280|28|1|C50SF-0375-3.15B-M (w/ jet slots)|Y
01|2280|31|1|C50SF-0500-3.15B-M (w/ jet slots)|Y
01|2280|33|1|C50SF-0750-3.15B-M (w/ jet slots)|Y
01|2291|1|1|Note above holders supplied w/ coolant nuts VCN-13BJ|Y
01|2291|1|2|Pricing reflects net charge on above holders|Y
01|2302|2|1|Included w/ SF Start2 Set|Y
01|2302|3|1|Included w/ SF Start2 Set|Y
01|2302|4|1|Included w/ SF Start2 Set|Y
01|2302|5|1|Included w/ SF Start2 Set|Y
01|2302|6|1|Included w/ SF Start2 Set|Y
01|2315|8|1|*Pls note this item is complete @ 8pcs.|Y
01|2315|8|2|Additional pcs will considered complete specials|Y
01|2360|10|1|Slim Chucks to be modified DIN Coolant and add CHIP|Y
01|2360|10|2|ID Slots for customer to add Balluff chips to holders.|Y
01|2368|4|1|this item is from I-Tine.  do not mix.|N
01|2368|4|2|thank you for odering these items.|Y
01|2371|1|1|repair of|Y
01|2374|1|1|SPECIAL SCREW NEEDE.  TEST.  HIRO|N
01|2374|1|2|THANK YOU VERY MUCH ..  TO SHOW TO MR. CUSTOMER|Y
01|2379|1|1|Above delivery is 2 weeks|N
01|2381|1|1|hello thank-you|Y
01|2382|1|1|Hi|N
01|2383|1|1|this is silly customer|Y
01|2384|1|1|Part on B/O ETA 3 weeks|Y
01|2388|1|1|this comment is for wh|N
01|2388|1|2|this is for customer.  thank you for ordering this|Y
01|2397|2|1|Thank you very much for the order!|Y
01|2397|2|2|Hey guys put the screw on the holder|N
01|2403|1|1|Thank you very much!|Y
01|2403|1|2|Make sure to send wrench with it this time.|N
01|2404|1|1|THank you very much.|Y
01|2404|1|2|Make sure to send wrench with holder this time!!|N
01|2405|2|1|thank you ver much for your order|Y
01|2405|2|2|Make sure you include the wrench|N
01|2406|1|1|THANK YOU VERY MUCH|Y
01|2406|1|2|Make sure to send wrench with it this time.|N
01|2407|2|1|thank you very much|Y
01|2407|2|2|make sure to send wrenchwith it this time|N
01|2424|3|1|Above the item is BO. Delivery End of Oct.|Y
01|2430|3|1|Line#3 MI50-TAP12|Y
01|2430|5|1|Line#4 pricing is vaild on a ER32 collet of your choice|Y
01|2447|6|1|this is comment attached to this item.|Y
01|2459|2|1|3 in stock B/O ETA to Lyndex-Nikken is 2 weeks|Y
01|2461|1|1|B/O-ETA to L/N 1-2 weeks|Y
01|2469|1|1|Make sure the box is clean.|N
01|2469|1|2|Thank you for the order|Y
01|2470|1|1|Make sure the box is clean.|N
01|2470|4|1|Thank you very much for your order|Y
01|2471|1|1|Make sure box is clean|N
01|2471|1|2|Thank you for your order|Y
01|2472|1|1|Warehouse make sure this box is clean|N
01|2472|2|1|Thank you for your order!|Y
01|2473|1|1|Make box is clean|N
01|2473|1|2|Thank you for this order|Y
01|2474|1|1|Be certain all boxes are clean!|N
01|2509|2|1|1)Shortening the existing aluminum riser base.|Y
01|2509|2|2|2)Making a new Chuck Holder (Heat pot) for Shrink Fit|Y
01|2509|2|3|Machine with sleeve to fit existing riser base.|Y
01|2509|2|4|3)Making a new Chuck Holder (Heat pot) for|Y
01|2509|2|5|Cooling Station.|Y
01|2515|1|1|8 pcs Stk balance = 7 weeks approx.|Y
01|2523|3|1|9 of the 10 collets in this set are in stock. The|Y
01|2523|3|2|NT05-012 is B/O with an ETA of 8-10 weeks.|Y
01|2525|5|1|H63A-SF14-90|Y
01|2525|5|2|HSK63A Shrink Fit 14mm Holder With 90mm Gage Length|Y
01|2531|7|1|Note you can choose any 3 collets above to be included|Y
01|2531|7|2|with the unit at no charge.|Y
01|2534|1|1|T32119|Y
01|2534|1|2|Mori Straight Radial X-axis ER32 for SL300|Y
01|2540|2|1|B/O-ETA to L/N 2-3 weeks|Y
01|2552|4|1|Price on 1 shell mill reflects Net Price|Y
01|2562|2|1|Std HSK63A-R0562 discontinued replace w/ coolant style|Y
01|2564|51|1|Above collet is considered a special & pricing reflects|Y
01|2564|51|2|Net charge.|Y
01|2600|17|1|K20-SK6-120 - SK6 straight Shank Slim Chuck|Y
01|2600|18|1|Part# BT40-HDZ09-105 & BT30-HDZ09-105 are NT TOOL|Y
01|2600|18|2|Part numbers which take a different collet series.|Y
01|2600|18|3|Please advise if you would like me to convert over.|Y
01|2603|1|1|The collapse range of this collet will fit a 1/8 tool|Y
01|2603|27|1|ISCAR# 4501156 has GL of 2.375 this has 1.75 GL|Y
01|2603|28|1|ISCAR# 4501156 has GL of 2.375 this has 4 GL|Y
01|2609|1|1|This item has a 6 gage length|Y
01|2616|5|1|Quote rqstd CAT50 1.5 SM holder. We have 4 GL's avlbl.|Y
01|2616|5|2|This std version has 2 GL. 4 6 & 8 also avlbl.|Y
01|2630|13|1|SK10-10 Collet has a collapse range of 10mm-9.5mm|Y
01|2630|13|2|therefore will achieve your 9.75mm request.|Y
01|2635|13|1|SK10-10 Collet has a collapse range of 10mm-9.5mm|Y
01|2635|13|2|therefore will achieve your 9.75mm request|Y
01|2638|1|1|TOOL #1 MSC 63698369|Y
01|2649|20|1|E20-018 is the only B/O pc for this set. ETA 8 wks|Y
01|2656|1|1|CAT50-SK16-150U|Y
01|2659|3|1|Nut Wrench|Y
01|2659|4|1|Spindle Wrench|Y
01|2666|3|1|This is a std non-stck item & must be quoted as a spcl|Y
01|2666|21|1|This is a std non-stck item & must be quoted as a spcl|Y
01|2666|25|1|This is a std non-stck item & must be quoted as a spcl|Y
01|2667|1|1|BT50-MTA1-180|Y
01|2667|3|1|BT50-MTA2-45|Y
01|2667|4|1|BT50-MTA2-45|Y
01|2667|5|1|BT50-MTA2-45|Y
01|2699|24|1|SK20-20A|Y
01|2699|25|1|SK25-20A|Y
01|2699|26|1|SK25-25A|Y
01|2714|1|1|Repair of customer's 5AX-2MT-120FA s/n# n/a (rusted)|Y
01|2714|1|2|Reference Lyndex-Nikken RGA# T-42955|Y
01|2714|2|1|TILT AXIS:|Y
01|2714|34|1|CONVERSION of FANUC to HAAS:|Y
01|2717|1|1|NOTE: 18 PCS IN STOCK - 2 PC BALANCE 2 WEEKS FACTORY|Y
01|2720|1|1|Weight is 2.8 lbs|Y
01|2720|2|1|Weight is 3.6 lbs|Y
01|2720|3|1|Weight is 2.5 lbs|Y
01|2724|1|1|Delivery = 2pcs 2-3 weeks Balance 6-7 weeks|Y
01|2724|1|2|Mimatic Part# 167718|Y
01|2724|2|1|Delivery = 1pcs 2-3 weeks Balance 6-7 weeks|Y
01|2724|2|2|Mimatic Part# 167731|Y
01|2724|4|1|Delivery - 1pc 2-3 weeks|Y
01|2724|4|2|Mimatic Part# 167710|Y
01|2724|5|1|Delivery = Stock|Y
01|2724|7|1|Delivery = 5-6 weeks|Y
01|2727|1|1|for Nikken TAT-250|Y
01|2727|2|1|for Nikken CNC302T|Y
01|2733|1|1|Repair services for 1x T32377C02 s/n# A0009|Y
01|2733|1|2|Reference Lyndex-Nikken RGA# R-43005|Y
01|2734|1|1|Repair of OK113-45000  s/n# A0003|Y
01|2734|1|2|Reference Lyndex-Nikken RGA# R-43048|Y
01|2734|2|1|bearings and seals|Y
01|2750|7|1|Ref. Lyndex Nikken RGA#43117|Y
01|2770|1|1|Repair of (1) BT40-MOC1.1/4-160|Y
01|2770|1|2|Ref. Lyndex Nikken RGA#43062|Y
01|2778|7|1|NK20-15 is a Special Order item currently out of stock|Y
01|2778|7|2|at factory. This item is non-returnable if purchased.|Y
01|2795|3|1|Delivery to be determined...|Y
01|2795|7|1|Delivery to be determined...|Y
01|2795|8|1|Option to above NCAT40-VC6-60U - Delivery approx 5 wks.|Y
01|2807|1|1|Repair of Aisin's CNC401FA s/n# 8088|Y
01|2807|1|2|Reference Lyndex-Nikken RGA# T-43023|Y
01|2807|10|1|Seal for 11+1 Rotary Joint|Y
01|2830|9|1|Stock at Factory - Delivery 2 weeks.|Y
01|2834|1|1|Re-greased outer spring|Y
01|2836|1|1|Same as Nikken part# PS-16|Y
01|2836|2|1|Same as Nikken part# PS-17|Y
01|2838|1|1|Repair of customer's 5AX-150FA-M s/n# 2003|Y
01|2838|1|2|Reference Lyndex-Nikken RGA# T-43083|Y
01|2839|2|1|Supplied with arbor screw and retention knob|Y
01|2850|2|1|3 pcs Stock & balance = 6 weeks|Y
01|2850|3|1|2 pcs Stk 10 pcs - 6 wks & balance = pending|Y
01|2854|3|1|This item is on B/O. ETA 3 business days.|Y
01|2875|6|1|To be modified by Lyndex-Nikken per machine specs|Y
01|2882|17|1|Customer to Confirm which pull studs they need.|Y
01|2882|17|2|Please advise.|Y
01|2884|13|1|Customer to confirm which pull studs they need.|Y
01|2884|13|2|Please advise.|Y
01|2884|14|1|All collets in stock for set except E32-042 (21/32)|Y
01|2885|1|1|Repair of (2)HSK63A-C32-110|Y
01|2885|1|2|Ref. Lyndex Nikken RGA#43202|Y
01|2888|1|1|Repair of customer's tailstock 1x PBA-135|Y
01|2888|1|2|Reference Lyndex-Nikken RGA# T-43193|Y
01|2903|6|1|MI40-TAP8|Y
01|2903|11|1|MI40-TAP8|Y
01|2906|5|1|Repair of (1) PF-2|Y
01|2906|5|2|Ref. Lyndex Nikken RGA#43243|Y
01|2908|11|1|3/64 = 1.1906mm|Y
01|2908|12|1|5/64 = 1.9844mm|Y
01|2909|1|1|**This item is a Special. See comments below.|Y
01|2910|3|1|Repair of (1)CAT40-NPU8-110U|Y
01|2910|3|2|Ref. Lyndex Nikken RGA#43266|Y
01|2910|4|1|Return of (1)CAT40-NPU8-110U(2)CAT40-NPU13-105U|Y
01|2910|4|2|(1)CAT40-NPU8-80U all un-repairable|Y
01|2914|1|1|This item is a special. See comments below**|Y
01|2917|1|1|2 week delivery|Y
01|2917|3|1|Stock at Nikken - 2 week delivery|Y
01|2917|5|1|Substitute for SK6-1/16|Y
01|2931|1|1|H40E-SF0125-2.36|Y
01|2931|2|1|H40E-SF0187-2.36|Y
01|2931|4|1|H40E-SF0250-5.12|Y
01|2931|5|1|H40E-SF3-60|Y
01|2931|6|1|H40E-SF4-60|Y
01|2931|8|1|H40E-SF6-130|Y
01|2935|14|1|*SPECIAL*|Y
01|2951|4|1|N-Battery|Y
01|2953|1|1|Have 2 pieces Stock at Nikken.|Y
01|2953|1|2|Delivery on remaining 2 pieces to be advised.|Y
01|2954|1|1|Non-Cancelable & Non-Returnable|Y
01|2954|2|1|Non-Cancelable & Non-Returnable|Y
01|2954|3|1|Non-Cancelable & Non-Returnable|Y
01|2954|5|1|Non-Cancelable & Non-Returnable|Y
01|2965|1|1|CAT50U-AFC1.1/4-230-90|Y
01|2969|1|1|Repair of (1) MCAT40-C3/4-120U|Y
01|2969|1|2|Ref. Lyndex Nikken RGA#42493|Y
01|2978|1|1|Weight: 28.2 lbs|Y
01|2978|2|1|Weight: 32 lbs|Y
01|2983|1|1|SKJ6-3.5  Net Price Only|Y
01|2983|1|2|Non-Cancelabla & Non-Returnable|Y
01|2984|13|1|Delivery ETA: Beginning of January|Y
01|3006|21|1|Repair of customer's CNC180A21 s/n# 7940|Y
01|3006|21|2|Reference Lyndex-Nikken RGA# T-42984|Y
01|3011|1|1|Repair of customer's 5AX-2MT-105-120  s/n# 8047|Y
01|3011|1|2|Reference Lyndex-Nikken RGA# T-43321|Y
01|3011|1|5|e|N
01|3017|1|1|Net Price Only|Y
01|3017|1|2|Non-cancelable & non-returnable item|Y
01|3024|1|1|Please advise the taper that is needed for this unit|Y
01|3032|1|1|Stock Nikken - 2 week delivery|Y
01|3049|10|1|Delivery ETA 4 weeks.|Y
01|3055|1|1|Repair of customer's H80FRAM-ER16-206ST|Y
01|3055|1|2|s/n# tag missing- case reads s/n# 44608 06|Y
01|3055|1|3|Reference Lyndex-Nikken RGA# R-43238|Y
01|3055|2|1|Replace all bearings and seals|Y
01|3070|12|1|Note - $5 retention studs - 1 stud per holder|Y
01|3076|1|1|3.13 GL without spanner nut.|Y
01|3076|2|1|5.00 GL without spanner nut.|Y
01|3076|3|1|9.00 GL without spanner nut.|Y
01|3083|1|1|cheap guy|N
01|3085|3|1|specail deal this time only|Y
01|3088|3|1|special deal|Y
01|3093|3|1|special deal this time only.|Y
01|3094|2|1|special tooling package one time only|Y
01|3094|2|2|do not sell at this discount in the future|N
01|3096|2|1|special deal this time only|Y
01|3103|1|1|this is the tool you were are having trouble before|Y
01|3103|1|2|I am giving you a free try on this tool|Y
01|3103|5|1|WE WILL CONVERT THIS HOLDER TO HIGH SPEED.  O MOD CHARG|Y
01|3105|1|1|this is the tool you were having problems with|Y
01|3105|5|1|we will convert this tool to high speed|Y
01|3105|6|1|we will not charge this modification n|N
01|3107|1|1|this is the tool you were having trouble with before|Y
01|3107|1|2|i am giving you a free trial on this|Y
01|3109|1|1|this is the tool you were having trouble before|Y
01|3109|1|2|i am giving you a free try on this tool|Y
01|3109|5|1|we will not charge this modification fee this time|N
01|3109|6|1|we will convert this tool to high speed|N
01|3109|6|2|this is CAT40-SK10-150UP|Y
01|3110|1|1|THIS IS THE RADIOACTIVE HOLDER.  PLEASE DO NOT TOUCH|Y
01|3110|2|1|YOU ARE RIPPING ME OFF MY KIDS WILL STARVE!|Y
01|3111|1|1|this is the tool you were having trouble before|Y
01|3111|1|2|I am giving you a free try on this tool|Y
01|3111|4|1|We will convert this tool to high speed|N
01|3111|4|2|This is CAT40-SK10-150UP|Y
01|3111|5|1|We will not charge to do this modification this time|Y
01|3112|1|1|Broke set screws on last one|Y
01|3112|1|2|Provide extra set of set screws no cost|Y
01|3112|1|3|This guy always uses cheater bar|N
01|3113|1|1|this is the tool you were haveing trouble before|Y
01|3113|1|2|I am giving you a free try on this tool|Y
01|3115|4|1|cjhlfh|N
01|3116|1|1|He keeps breaking set screws|N
01|3116|1|2|His shop workers are using a 3' bar on allen wrench|N
01|3116|1|3|Providing extra set of set screws free!|Y
01|3116|2|1|He keeps breaking set screws|N
01|3116|2|2|using 3' bar on allen wrench|N
01|3116|2|3|Providing free set of set screws!|Y
01|3116|3|1|sames comments as #1|N
01|3116|3|2|Providing free set of set screws!|Y
01|3118|2|1|1.75 GL|Y
01|3118|3|1|2 GL|Y
01|3118|4|1|3 GL|Y
01|3118|5|1|3 GL|Y
01|3118|6|1|3 GL|Y
01|3118|7|1|3 GL|Y
01|3118|8|1|3 GL|Y
01|3119|1|1|Note: coolant thru live tools must run with coolant|Y
01|3119|2|1|Note: coolant thru live tools must run with coolant|Y
01|3119|3|1|Note: Max cutting torque 6 Nm (4.5 Ft Lbs)|Y
01|3119|5|1|ER sealed collets are mechanically sealed up to 1000psi|Y
01|3119|5|2|and guaranteed TIR of .0001 or better at the|Y
01|3119|5|3|collet nose|Y
01|3124|1|1|75 pieces by the end of Jan balance ETA 13-14 wks.|Y
01|3128|3|1|For test only|Y
01|3129|1|1|this is your high speed 1/2 tool holder|Y
01|3129|4|1|this tool is for your horizontal machine|Y
01|3130|32|1|Our ER holders come with a bearig nut which provides|Y
01|3130|32|2|40% more clamping torque than hex nuts and eliminates|Y
01|3130|32|3|collet twist causing runout due to over torquing the|Y
01|3130|32|4|nut.|Y
01|3130|33|1|Our ER holders come with a bearig nut which provides|Y
01|3130|33|2|y0% more clamping torque than hex nuts and eliminates|Y
01|3130|33|3|collet twist causing runout due to over torquing the|Y
01|3130|33|4|nut.|Y
01|3130|34|1|Techniks 31528. Same dimensions!|Y
01|3130|34|2|See page 12 in white ELCO shrink fit catalog|Y
01|3130|34|3|Gave extra discount to take business from Techniks|N
01|3130|35|1|Techniks 29014B  Same dimensions!|Y
01|3130|35|2|See page 11 in white ELCO shrink fit catalog|Y
01|3130|35|3|Gave extra discount to take business from Techniks|N
01|3130|36|1|Techniks 29023B Same Dimensions!|Y
01|3130|36|2|See page 11 in white ELCO shrink fit catalog|Y
01|3130|36|3|Gave extra discount to take business from Techniks|N
01|3130|37|1|Techniks 29029B Same dimensions!|Y
01|3130|37|2|See page 11 in white ELCO shrink fit catalog|Y
01|3130|37|3|Gave extra discount to take business from Techniks|N
01|3130|38|1|Techniks 29010B Same dimensions!|Y
01|3130|38|2|See page 11 in white ELCO shrink fit catalog|Y
01|3130|38|3|Gave extra discount to take business from Techniks|N
01|3130|39|1|Techniks 29020B Same dimensions!|Y
01|3130|39|2|See page 11 in white ELCO shrink fit catalog|Y
01|3130|39|3|Gave extra discount to take business from Techniks|N
01|3130|40|1|Techniks 29026B Same dimensions!|Y
01|3130|40|2|See page 11 in white ELCO shrink fit catalog|Y
01|3130|40|3|Gave extra discount to take business from Techniks|N
01|3130|41|1|Techniks 29034B Same dimensions!|Y
01|3130|41|2|See page 11 in white ELCO shrink fit catalog|Y
01|3130|41|3|Gave extra discount to take business from Techniks|N
01|3131|1|1|Lyndex Nikken SK Collet Systems feature twice the|Y
01|3131|1|2|gripping power of ER Collet Chucks. With Runout|Y
01|3131|1|3|accuarcies of less than .0002 at 4XD Lyndex-Nikken|Y
01|3131|1|4|collet chucks is the best solution for high precsion|Y
01|3131|1|5|machining.|Y
01|3131|2|1|Lyndex Nikken SK Collet Systems feature twice the|Y
01|3131|2|2|gripping power of ER Collet Chucks. With Runout|Y
01|3131|2|3|accuarcies of less than .0002 at 4XD Lyndex-Nikken|Y
01|3131|2|4|collet chucks is the best solution for high precsion|Y
01|3131|2|5|machining.|Y
01|3131|3|1|Partial Delivery|Y
01|3131|4|1|10 pcs in stock|Y
01|3143|1|1|With this holder you will become a millionare!|Y
01|3143|2|1|Please use KM1 series collets with this holder.|Y
01|3143|3|1|End Mill Holders are very ridgid run out is poor.|Y
01|3143|4|1|Use the tool jaw to tighten the holder or pull stud|Y
01|3145|1|1|SK10 Holders have a max capacity of 10mm or 3/8|Y
01|3145|2|1|SK25 has up to a 1.0 capacity.  Use SK25 collets|Y
01|3145|10|1|Milling Chuck has 3600 ft-lbs of clamp torque.  EM Use|Y
01|3147|16|1|Repair of (1) CAT50-AFT35-230-90|Y
01|3147|16|2|Ref. Lyndex Nikken RGA#43261|Y
01|3149|2|1|This is a size you requested to test|Y
01|3149|2|2|This will be free|Y
01|3149|4|1|This is a shorter gage length than you requested|Y
01|3149|4|2|I think this might work better for you in your app|Y
01|3176|3|1|7.17 Gauge Length|Y
01|3176|4|1|4.67 Gauge Length|Y
01|3180|37|1|I SHOWED BOB THE UMT & TOLD HIM HE WOULD BE MUCH|N
01|3180|37|2|HAPPIER WITH THIS EDGE FINDER|N
01|3180|38|1|I SHOWED BOB THE HP-4 WITH MAGNETIC BASE. HE AGREED IT|N
01|3180|38|2|WAS A BETTER CHOICE BECUASE HE CAN ALSO USE IT ON HIS|N
01|3180|38|3|LAHES|N
01|3203|1|1|Repair of CNCZ202LSA3 s/n# 1019|Y
01|3203|1|2|and conversion to AA21 control|Y
01|3203|1|3|Reference Lyndex-Nikken RGA# T-43286|Y
01|3206|1|1|Repair of CNCZ202LSA3 s/n# 1017|Y
01|3206|1|2|and conversion to AA21 control|Y
01|3206|1|3|Reference Lyndex-Nikken RGA# T-43286|Y
01|3219|1|1|Part Number: 155475|Y
01|3219|2|1|Part Number: 155512|Y
01|3219|3|1|Part Number: 155451|Y
01|3239|4|1|160 mm gauge length. You requested 120 mm gauge length|Y
01|3239|4|2|We don't offer this in 120 mm gauge length|Y
01|3239|5|1|80 mm gauge length. You requested 100 mm gauge length|Y
01|3239|5|2|We don't offer this item in 100 mm gauge length. I can|Y
01|3239|5|3|offer this in 160 mm gauge length if you prefer|Y
01|3239|9|1|101.4mm gauge length. You requested 120 mm gauge length|Y
01|3239|9|2|we don't offer this in 120 mm gauge length|Y
01|3253|3|1|repair of (1) PF-2|Y
01|3253|3|2|Ref. Lyndex Nikken RGA#43380|Y
01|3260|3|1|N Style Battery|Y
01|3270|1|1|Repair of customer's CNCZ180LFA (s/n# 10070)|Y
01|3270|1|2|Reference Lyndex-Nikken RGA# T-43340|Y
01|3280|2|1|5/8 Coolant Collet at N/C|Y
01|3299|3|1|Blank positioning block TBD at a later date.|Y
01|3319|4|1|Note that the BT40-WE1/2-65 is discontinued. This part|Y
01|3319|4|2|is almost identical and has a 2.5 GL vs the 65mm GL.|Y
01|3329|1|1|ETA 1-2 weeks|Y
01|3329|2|1|1 pc in production-ETA 6 weeks|Y
01|3338|1|1|Repair of customer's CNC250FA-M sn# na|Y
01|3338|1|2|Reference Lyndex-Nikken RGA# T-43363|Y
01|3338|1|3|e|N
01|3388|4|1|battery|Y
01|3395|1|1|Repair of customer's NST250 s/n# 1310|Y
01|3395|1|2|Reference Lyndex-Nikken RGA# T-43415|Y
01|3395|3|1|Strap for retainer|Y
01|3395|3|2|NS251R016|Y
01|3399|2|1|Repair of (1) CAT40-NPU13-105U|Y
01|3399|2|2|Ref. Lyndex Nikken RGA#43370|Y
01|3429|1|1|Partial shipments are ok.|Y
01|3429|2|1|Partial shipments are ok|Y
01|3514|1|1|ETA to L/N 5-7 business days.|Y
01|3520|4|1|3mm dia. ball bearing|Y
01|3520|5|1|N style battery|Y
01|3526|3|1|Battery|Y
01|3526|5|1|Repair of (1) CAT50-UMT200UH|Y
01|3526|5|2|Ref. Lyndex Nikken RGA#43422|Y
01|3533|4|1|Command part# RS4M-0205|Y
01|3534|1|1|ETA 5-7 business days.|Y
01|3583|1|1|C5005-1375|Y
01|3583|8|1|C50S5-1375-5.75|Y
01|3586|3|1|N style battery|Y
01|3586|11|1|Repair of (5) PF-2 point finders|Y
01|3586|11|2|Ref. Lyndex Nikken RGA#43315|Y
01|3610|1|1|Repair of customer's CNCZ180LYA-BR s/n# 6011|Y
01|3610|1|2|Reference Lyndex-Nikken RGA# T-43421|Y
01|3611|1|1|Repair of customer's CNCZ180LSA3 s/n# 5002|Y
01|3611|1|2|Reference Lyndex-Nikken RGA# T-43420|Y
01|3615|1|1|Repair of customer's 5AX-2MT-105-120FA s/n# 8101|Y
01|3615|1|2|Reference Lyndex-Nikken RGA#A T-43233|Y
01|3615|12|1|Interal Power Signal Cable TCE-43381-J1|Y
01|3615|12|2|R-Axis|Y
01|3624|1|1|Repair of (2) BT40-C1.1/4-85|Y
01|3624|1|2|Ref. Lyndex Nikken RGA#43377|Y
01|3642|1|1|Repair of customer's CNC150 Alpha s/n# 5902|Y
01|3642|1|2|Reference Lyndex-Nikken RGA# T-43472|Y
01|3740|3|1|CAT40-PX10-MDSK6-R65|Y
01|3768|1|1|12 currently in stock|Y
01|3768|3|1|3 currently in stock|Y
01|3768|4|1|17 currently in stock|Y
01|3783|4|1|Repair of (1) ZERO-SET4|Y
01|3783|4|2|Ref. Lyndex Nikken RGA#43493|Y
01|3798|2|1|Extra 10% for limited time only on C40S6-0500|Y
01|3798|2|2|Not valid with any other offers unless stated in quote.|Y
01|3866|1|1|HSK63F-ER25-3.50|Y
01|3866|1|2|Net Price Only|Y
01|3866|2|1|HSK63F-ER25-5.00|Y
01|3866|2|2|Net Price Only|Y
01|3876|1|1|16 stock balance ETA 1-2 weeks.|Y
01|3898|1|1|BT50-FMA31.75-45 Is non returnable item|Y
01|3940|2|1|7 ETA 1-2 weeks balance ETA 8 wks|Y
01|3940|3|1|KM1-3|Y
01|3940|4|1|KM1-4|Y
01|3940|9|1|9 ETA 1-2 wks balance ETA 7 wks|Y
01|4057|1|1|Repair of customer's CNC200BGA-M s/n# 3755|Y
01|4057|1|2|Reference Lyndex-Nikken RGA# T-43490|Y
01|4060|1|1|C4016-1500-4.50 DIN|Y
01|4060|1|2|Net Price Only|Y
01|4073|1|1|Repair of (1) FP-2|Y
01|4073|1|2|Ref. Lyndex Nikken RGA#43451|Y
01|4073|2|1|Battery|Y
01|4088|1|1|Repair of customer's 5AX-201FA-M sn# 1235|Y
01|4088|1|2|Reference Lyndex-Nikken RGA# T-43512|Y
01|4094|1|1|Repair of customer's CNC201MA-M sn# 8405|Y
01|4094|1|2|Reference Lyndex-Nikken RGA# T-43444|Y
01|4116|1|1|Rust-proof|Y
01|4116|2|1|Rust-proof|Y
01|4135|1|1|CAT40 VERSION. SF GLOVES INCLUDED.|Y
01|4135|5|1|THESE ARE THE 30 TAPER POTS|Y
01|4135|9|1|NO LOSS OF CLAMPING FORCE DUE TO CP|Y
01|4135|10|1|NO LOSS OF CLAMPING FORCE DUE TO CP|Y
01|4135|11|1|NO LOSS OF CLAMPING FORCE DUE TO CP|Y
01|4370|2|1|Baker's Dozen Promo-Buy 12 get 1 free|Y
01|4370|3|1|2013 Fall Special Pricing|Y
01|4434|8|1|Repair of (2) W1005-0562 tap holders|Y
01|4434|8|2|Ref. Lyndex Nikken RGA#43531|Y
01|4435|2|1|TCL-100GH|Y
01|4435|3|1|TCL-100HD|Y
01|4447|1|1|Repair/Calibration of (1) CAT40-UMT200UH|Y
01|4447|1|2|Ref. Lyndex Nikken RGA#43544|Y
01|4450|1|1|Repair of customer's W10S5-0562.|Y
01|4450|1|2|Ref. RGA# R-43446|Y
01|4468|1|1|Repair of customer's C4005-0562(C) x1|Y
01|4468|1|2|Ref. Lyndex-Nikken RGA# R-43574|Y
01|4513|5|1|KM42-6.2|Y
01|4513|6|1|KM42-18.45|Y
01|4513|7|1|KM42-6.45|Y
01|4547|3|1|16 Stock @ Nikken-Balance ETA 10-12 wks|Y
01|4547|4|1|4 stock @ Nikken-Balance ETA 10-12 wks|Y
01|4547|5|1|Balance stock @ Nikken: ETA 1-2 wks|Y
01|4547|12|1|Balance stock @ Nikken: ETA 1-2 wks|Y
01|4654|3|1|Generic Positioning Block to be determined by|Y
01|4654|3|2|Machine specs.|Y
01|4678|1|1|This item requires application approval prior purchase|Y
01|4679|24|1|NCAT50-C1.1/4-165U|Y
01|4718|2|1|Generic positioning block-TBD by Machine Specs|Y
01|4769|1|1|Repair of (1) CAT40-C32-105U|Y
01|4769|1|2|Ref. Lyndex Nikken RGA#43604|Y
01|4772|1|1|Repair services of the customer's following:|Y
01|4772|1|2|2x NC5-46-SK10C-90|Y
01|4772|1|3|3x NC5-46-SK10C-120|Y
01|4772|1|4|Ref. RGA# R-43355|Y
01|4772|5|1|Repair of customer's following:|Y
01|4772|5|2|2x S-NC5-46-FMA31.75CS-45-M|Y
01|4772|9|1|Repair of the customer's following:|Y
01|4772|9|2|1x S-NC5-46-C25-165|Y
01|4772|9|3|6x NC5-46-C25-90|Y
01|4772|14|1|Return of customer's 2x NC5-46-SK10C-90|Y
01|4772|14|2|Units are unrepairable.|Y
01|4772|14|3|No credit will be issued|Y
01|4778|1|1|Repair of customer's 1x OKEX-ER32Z-MS s/n# AL006|Y
01|4778|1|2|Reference Lyndex-Nikken RGA# R-43485|Y
01|4778|2|1|Bearings seals and gears|Y
01|4810|1|1|w/ PS-123-AIR installed @ factory|Y
01|4828|31|1|Non-cancelable & non-returnable item.|Y
01|4832|1|1|Repair of customer's 1x T32377002 sn# n/a|Y
01|4832|1|2|1x T32378002 sn# A0019|Y
01|4832|1|3|Reference Lyndex-Nikken RGA# R-43488|Y
01|4832|2|1|Repair of T32377002 sn# n/a|Y
01|4832|3|1|Repair of T32378002 sn# A0019|Y
01|4837|13|1|NIT50-FMA25.4-45|Y
01|4837|14|1|NIT50-FMA31.75-45|Y
01|4837|15|1|NIT50-FMA38.1-45|Y
01|4837|16|1|NIT50-C1.1/4-120|Y
01|4837|20|1|NIT50-SK25C-105|Y
01|4837|27|1|NIT50-NPU13-90|Y
01|4896|1|1|Repair of customer's 1X N5005-0562 and|Y
01|4896|1|2|1X C5005-0562|Y
01|4896|1|3|Ref. RGA# R-43560|Y
01|4896|2|1|Repair of N5005-0562|Y
01|4896|9|1|Repair of C5005-0562|Y
01|4907|1|1|Repair of customer's 5AX-130BMA s/n# n/a|Y
01|4907|1|2|Reference Lyndex-Nikken RGA# T-43445|Y
01|4915|1|1|Repair of customer's 5AX-4MT-105-120FA-M sn# 2025|Y
01|4915|1|2|Reference Lyndex-Nikken RGA# T-43234|Y
01|4915|4|1|Plating and grinding of customer's original|Y
01|4915|4|2|pancake housings.|Y
01|4929|12|1|NIT50-FMA25.4-45 TAPER PLUS 1 PILOT FACE MILL ARBOR|Y
01|4929|13|1|NIT50-FMA31.75-45 TAPER PLUS 1.1/4 PILOT FACE MILL ARBO|Y
01|4929|14|1|NIT50-FMA38.1-45 TAPER PLUS 1.5 PILOT FACE MILL ARBOR|Y
01|4929|15|1|NIT50-C1.1/4-105 TAPER PLUS 1.1/4 MILLING CHUCK|Y
01|4929|20|1|NIT50-SK25C-105 TAPER PLUS SK25 COLLET CHUCK|Y
01|4929|27|1|NIT50-NPU13-90 TAPER PLUS 1/2 DRILL CHUCK|Y
01|4962|3|1|CAT40-TP200U|Y
01|4975|1|1|Repair of Customer's 5AX-2MT-105-120FA s/n 8185|Y
01|4975|1|2|Reference Lyndex-Nikken RGA# T-43590|Y
01|4975|3|1|Plating and grinding of customer's original spindle|Y
01|4981|1|1|Repair of Customer's 1x C5005-1375|Y
01|4981|1|2|Reference RGA# R-43507|Y
01|5042|3|1|C5007-0032DIN - Modified DIN price reflects net charge|Y
01|5042|6|1|C5017-0020DIN - Modified DIN price reflects net charge|Y
01|5042|8|1|C5017-0032DIN - Modified DIN price reflects net charge|Y
01|5053|3|1|C5007-0032DIN - Modified DIN price reflects net charge|Y
01|5053|6|1|C5017-0020DIN - Modified DIN price reflects net charge|Y
01|5053|8|1|C5017-0032DIN - Modified DIN price reflects net charge|Y
01|5062|1|1|The above holder is 1.38 gauge length|Y
01|5062|2|1|The above holder is 2.5 gauge length.|Y
01|5062|3|1|The above holder is 4 gauge length.|Y
01|5075|3|1|For use w/ NKA01-20000|Y
01|5075|4|1|For use w/ NKA01-46000|Y
01|5075|5|1|For use w/ NKA01-20000 & NKA01-46000|Y
01|5083|1|1|Repair of customer's BT40-C1.1/4-90|Y
01|5083|1|2|Reference Lyndex-Nikken RGA# R-43669|Y
01|5094|1|1|Repair of customer's CAT50U-AHT35-210-90 x 1|Y
01|5094|1|2|Ref: Lyndex-Nikken RGA# R-43626|Y
01|5095|2|1|Balanced to G2.5 @ 15000 RPM|Y
01|5152|2|1|Non-cancelable & non-returnable item.|Y
01|5215|1|1|Repair of customer's 1x PF-2|Y
01|5215|1|2|Reference: Lyndex-Nikken RGA# R-43640|Y
01|5215|2|1|Needs to be re-calibrated|Y
01|5219|1|1|Repair of customer's 5AX-150FA-M s/n 1112|Y
01|5219|1|2|Reference: Lyndex-Nikken RGA# T-43545|Y
01|5238|1|1|Net Price Only|Y
01|5238|1|2|Non-cancelable & non-returnable item.|Y
01|5240|1|1|HSK40A-TB30-150 (Testbar)|Y
01|5240|1|2|Non-cancelable & non-returnable item.|Y
01|5240|1|3|Net Price Only|Y
01|5266|1|1|Repair of customer's CAT40-UMT200UH|Y
01|5266|1|2|Reference: RGA# R-43662|Y
01|5266|3|1|Needs to be re-calibrated.|Y
01|5288|3|1|C4005-1500-4.50 P&D Pending|Y
01|5328|3|1|Pls note the 12mm is not a direct cross as the Haimer|Y
01|5328|3|2|has an oversize shank and ours does not.|Y
01|5331|1|1|Repair of customer's 1x Eppinger D73770 s/n 129696-3|Y
01|5331|1|2|Reference Lyndex-Nikken RGA# R-43624|Y
01|5331|2|1|Bearings and Seals|Y
01|5332|21|1|1 ETA 1-2 wks 1 ETA 4 months|Y
01|5332|22|1|2 ETA 1-2 wks 6 ETA 4 months|Y
01|5381|1|1|Discount reflects non-returnable tooling|Y
01|5381|1|2|per Nick Mazis/Test|Y
01|5445|2|1|Special|Y
01|5447|1|1|Non-cancelable & non-returnable item|Y
01|5477|1|1|Non-cancelable & non-returnable item.|Y
01|5551|56|1|CAT50-SK25-165UP|Y
01|5594|24|1|Included in the SF-START2-SET-HSK63 Unit|Y
01|5602|21|1|UE7510010 Bearing|Y
01|5667|4|1|Only one Avil.|Y
01|5692|1|1|Special Package Price for Worm Screw Assembly parts|Y
01|5692|1|2|Includes bearings seals gears|Y
01|5782|1|1|Non-cancelable & non-returnable item.|Y
01|5792|4|1|CCNK25-16|Y
01|5795|1|1|DIN Modification NET $409.60 each 1 week|Y
01|5849|1|1|CAT40-SF4-80|Y
01|5854|1|1|1x repairable PF-2|Y
01|5854|1|2|Ref: RGA# R-43694|Y
01|5854|3|1|N-Style Batteries|Y
01|5880|1|1|Repair of customer's 1x CNC170FA s/n 5340|Y
01|5880|1|2|Reference RGA# T-43751|Y
01|5925|1|1|Repair of Customer's CNCZ180LFA S/N 7335|Y
01|5925|1|2|Reference RGA# T-43752|Y
01|5940|1|1|Repair of customer's CNCZ180-LSA3 S/N 2029|Y
01|5940|1|2|Reference RGA# T-43753|Y
01|6077|1|1|BT40-C3/4-70-M-DIN (to be modified to DIN)|Y
01|6077|1|2|Delivery: 13 pcs = 4 wks & bal 7 pcs = pending|Y
01|6090|1|1|BT40-C3/4-70-M-DIN (to be modified to DIN)|Y
01|6090|1|2|Delivery: 13 pcs = 4 wks & bal 7 pcs = pending|Y
01|6090|2|1|NBT40-C3/4-70-M-DIN (to be modified to DIN)|Y
01|6090|2|2|Delivery: 10 pcs = 4 wks & bal 10 pcs = pending|Y
01|6115|1|1|Repair of customer's CAT40-Z12-130U x1|Y
01|6115|1|2|Reference L-N RGA# R-43788|Y
01|6115|2|1|3/16 Ball Bearings|Y
01|6140|1|1|45 ETA 1-2 wks balance TBD|Y
01|6212|1|1|Repair of customer's NST250 s/n 1189|Y
01|6212|1|2|RGA# T-43731|Y
01|6243|1|1|After stock is depleted we will no longer offer this|Y
01|6243|1|2|item as standard.|Y
01|6243|2|1|May be able to get up to 3 pcs in 1-2 wks. If not|Y
01|6243|2|2|all pcs ETA 7-8 wks|Y
01|6253|1|1|Repair of customer's CAT50U-AFC1.1/4-230-90 x1|Y
01|6253|1|2|REF: RGA# R-43711|Y
01|6253|4|1|#50-AH90-SGK|Y
01|6253|13|1|#50-AF-90-ASRB|Y
01|6360|1|2|Repair of Customer's 2x C5005-1375(C)|Y
01|6360|1|3|Reference: RGA# R-43688|Y
01|6360|2|1|Repair parts for 1x C5005-1375(C)|Y
01|6360|5|1|Repair parts for 1x C5005-1375(C)|Y
01|6360|11|1|TC1375(C)-24|Y
01|6429|1|1|Repair of customer's CAT50-UMT200U x1|Y
01|6429|1|2|Ref: RGA# R-43801|Y
01|6429|3|1|Battery|Y
01|6429|4|1|Also needs to be recalibrated.|Y
01|6431|1|1|Repair of customer's CAT40-UMT200UH x1|Y
01|6431|1|2|Ref: RGA# R-43813|Y
01|6431|3|1|Also needs to be recalibrated.|Y
01|6452|3|1|Any 10 standard GL shrink fit holders included in|Y
01|6452|3|2|SF package|Y
01|6489|1|1|Weight is .34 lbs|Y
01|6489|2|1|Weight is .32 lbs|Y
01|6489|3|1|Weight is 7 lbs|Y
01|6508|1|1|Repair of customer's 2x CAT40-C3/4-85U|Y
01|6508|1|2|Ref: RGA# R-43691|Y
01|6508|2|1|1x CAT40-C3/4-85U|Y
01|6508|5|1|1x CAT40-C3/4-85U|Y
01|6521|1|1|Repair of customer's CNC300 s/n: 1504|Y
01|6521|1|2|Ref: RGA# T-43796|Y
01|6523|1|1|Discount reflects replacement tooling/RGA R-43227|Y
01|6527|1|1|Repair of customer's 1x C40S5-0562|Y
01|6527|1|2|Ref: RGA# R-43820|Y
01|6590|1|1|2 ETA 1 wk balance ETA 7 wks|Y
01|6600|24|1|*$3.00 fee/ea to install HSK63-TUBE into HSK63A holder*|Y
01|6650|1|1|BO Until End of March|Y
01|6650|2|1|BO until End of March|Y
01|6656|1|1|Repair of customer's 5AX-2MT-105-120SA-BR s/n: n/a|Y
01|6656|1|2|Ref: RGA# T-43749|Y
01|6714|6|1|NK25-10|Y
01|6742|1|1|9 pcs in stock 2-4 weeks for remainder 1 pcs|Y
01|6742|2|1|4-6 weeks for delivery|Y
01|6742|3|1|2-4 weeks for delivery|Y
01|6742|4|1|In Stock|Y
01|6747|1|1|Alternate for Nikken PS-O19G|Y
01|6747|1|2|*Customer to use lock-tite to create seal|Y
01|6773|1|1|Cross for Mori Seiki part# T32478|Y
01|6773|2|1|Cross for Mori Seiki part# T32234|Y
01|6791|4|1|*Quoted just in case the customer does not have.|Y
01|6871|1|1|Repair of customer's 2x CAT40-C3/4-85U|Y
01|6871|1|2|Ref: RGA# R-43691|Y
01|6871|2|1|1x CAT40-C3/4-85U|Y
01|6871|5|1|1x CAT40-C3/4-85U|Y
01|6875|1|1|Repair of Customer's PF-2|Y
01|6875|1|2|Ref: RGA# R-43833|Y
01|6882|1|1|Repair of customer's CAT50-UNT200U x1|Y
01|6882|1|2|REF: RGA# R-43801|Y
01|6882|4|1|Battery|Y
01|6954|7|1|C5017-0016DIN-M - pirce is Net for modification|Y
01|6954|9|1|C5017-0016DIN-M - pirce is Net for modification|Y
01|6970|9|1|Blank is to be drilled out for SKJ10-5.5 by customer|Y
01|6992|1|1|Repair of various NC5 holders|Y
01|6992|1|2|Ref: RGA# R-43794|Y
01|6992|2|1|1x S-NC5-46-FMA38.1CS-45-M|Y
01|6992|6|1|Repair of 2x NC5-46-SK16C-90|Y
01|6992|10|1|Repair of 2x NC5-46-SK10C-90|Y
01|6992|14|1|Repair of 1x NC5-46-SK10C-120|Y
01|6992|18|1|Repair of 5x S-NC5-46-FMA31.75CS-45-M|Y
01|7014|2|1|Net Price on above item relects in house modification|Y
01|7014|6|1|C5017-0016DIN-M|Y
01|7014|6|2|Net Price on above item relects in house modification|Y
01|7140|8|1|*3.75 gage length|Y
01|7140|11|1|*Gage length is 4.50|Y
01|7140|13|1|*Ship partial?|Y
01|7140|13|2|1/4 B/O until 3/17      17/32 B/O until 3/5|Y
01|7140|25|1|**Convert Hi-Speed to std|Y
01|7160|1|1|Net Price Only|Y
01|7160|2|1|Net Price Only|Y
01|7280|1|1|Non-cancelable & non-returnable item.|Y
01|7319|2|1|Fee to swap out standard nut w/ 016-HEX.|Y
01|7321|1|1|2 gage length|Y
01|7321|2|1|4 gage length|Y
01|7325|2|1|CAT50-SK25-165UP|Y
01|7326|1|1|Repair of customer's CAT50-Z12-175U|Y
01|7326|1|2|Ref: RGA# R-43878|Y
01|7326|5|1|3/16 Ball bearings|Y
01|7333|1|1|Repair of customer's 1x PF-2|Y
01|7333|1|2|Ref: RGA# R-43850|Y
01|7333|5|1|N Style Battery|Y
01|7341|2|1|*Quoted wrench for collet chuck if customer|Y
01|7341|2|2|does not have one already.|Y
01|7371|1|1|Repair of customer's NSVZ180 s/n: n/a|Y
01|7371|1|2|Ref: RGA# T-43874|Y
01|7398|3|1|Alpha 4/4000i Motor Cover|Y
01|7398|6|1|Internal Cable|Y
01|7398|7|1|*1x NSVZ180 s/n 4025 was shipped to L-N with freight|Y
01|7398|7|2|charged to Lyndex-Nikken.|Y
01|7398|7|3|Madison Precision is responsible for shipping charges|Y
01|7398|7|4|to and from Lyndex-Nikken.|Y
01|7436|1|1|Non-cancelable & non-returnable item|Y
01|7436|4|1|Non-cancelable & non-returnable itemy|Y
01|7453|1|1|*13pc B/O 3-4 wks|Y
01|7585|1|1|Crossover from Parlec#  190.15685.000|Y
01|7585|2|1|Crossover from Parlec# 190.15671.000|Y
01|7622|1|1|Repair of Customer's 1x PF-2|Y
01|7622|1|2|Ref: RGA# R-43936|Y
01|7622|7|1|2x N Style Batteries|Y
01|7634|1|1|Same as Mori T32206|Y
01|7634|2|1|Same as Mori T32213|Y
01|7634|3|1|Same as Mori T32218 & T32207|Y
01|7634|4|1|Same as Mori T32214|Y
01|7634|6|1|Nut wrench used on lines 1 & 3.|Y
01|7634|7|1|Nut wrench used on lines 2 & 4.|Y
01|7634|8|1|Spindle wrench used on all live tools on this list.|Y
01|7664|1|1|Repair of customer's 1x CNCZ321 s/n n/a|Y
01|7664|1|2|REF: RGA# T-43915|Y
01|7670|1|1|Repair of customer's C40RA-0025|Y
01|7670|1|2|REF: RGA# R-43885|Y
01|7717|6|1|*This holder is balanceable - it will have|Y
01|7717|6|2|balancing holes.|Y
01|7717|6|3|Balanced to G2.5 @ 24000RPM with option to|Y
01|7717|6|4|rebalance up to 40000RPM|Y
01|7717|7|1|*This holder is balanceable - it will have|Y
01|7717|7|2|balancing holes.|Y
01|7717|7|3|Balanced G2.5 @ 24000RPM with option to|Y
01|7717|7|4|rebalance up to 40000RPM|Y
01|7717|9|1|*Wrench sold separte for HSK63A-ER32-4.00|Y
01|7717|11|1|*Wrench sold separate for HSK63A-NPU13C-135|Y
01|7766|2|1|Rotary Axis Motor Cover|Y
01|7776|1|1|$1000.00 Tooling Certificate|Y
01|7798|1|1|Repair of customer's 1x CNC401 s/n: n/a|Y
01|7798|1|2|Reference: RGA# T-43918|Y
01|7809|1|1|#124610|Y
01|7809|2|1|#124018|Y
01|7891|1|1|Components to make: NC5-100 Power 5|Y
01|7906|1|1|Repair of customer's 1x KAX-2MT-105-120 s/n: n/a|Y
01|7906|1|2|Ref: RGA# T-43932|Y
01|7941|1|1|Repair of customer's 1x HSK100A-C3/4-115|Y
01|7941|1|2|Ref: RGA# R-43912|Y
01|8075|1|1|Repair of customer's 5AX-130BAYA-BR s/n: 1615|Y
01|8075|1|2|Ref: RGA# T-43858|Y
01|8212|8|1|non-cancelable & non-returnable items|Y
01|8212|20|1|non-cancelable & non-returnable items|Y
01|8226|3|1|ETA 2 Weeks|Y
01|8233|1|1|Repair of customer's 1x CAT40-Z12-130U|Y
01|8233|1|2|Ref: RGA# R-43999|Y
01|8233|3|1|3/16 ball bearings|Y
01|8368|1|1|ETA 2 Weeks|Y
01|8372|1|1|4.00|Y
01|8372|2|1|6.00|Y
01|8372|3|1|8.00|Y
01|8372|4|1|4.00|Y
01|8372|5|1|6.00|Y
01|8372|6|1|4.00|Y
01|8372|7|1|6.00|Y
01|8372|8|1|4.00|Y
01|8372|9|1|6.00|Y
01|8372|10|1|2.00|Y
01|8372|11|1|6.00|Y
01|8372|12|1|3.00|Y
01|8372|13|1|4.00|Y
01|8372|14|1|4.00|Y
01|8372|15|1|2.25|Y
01|8372|16|1|3.63|Y
01|8404|1|1|Repair of customer's 1x CAT40-MMC8C-90U|Y
01|8404|1|2|Reference RGA# R-43995|Y
01|8454|1|1|Repair of customer's S32-UMT|Y
01|8454|1|2|Reference RGA# R-43968|Y
01|8454|3|1|N style batteries|Y
01|8470|1|1|Repair of customer's 1x PF-2|Y
01|8470|1|2|Reference RGA# R-43998|Y
01|8470|2|1|Recalibration|Y
01|8479|1|1|Repair of customer's CAT40-UMT200UH x1|Y
01|8479|1|2|Reference RGA# R-43990|Y
01|8479|5|1|9V Battery|Y
01|8481|1|1|Repair of customer's CNCZ201 s/n: 8039|Y
01|8481|1|2|Ref: RGA# T-42655|Y
01|8483|6|1|Balance ETA in 8 wks|Y
01|8521|2|1|MODIFICATION-PB-SP  - Special Block Supplied by L&N|Y
01|8530|1|1|Repair of customer's 5AX-350FA-R36 s/n: 3546|Y
01|8530|1|2|Reference RGA# T-43920|Y
01|8631|6|1|non-cancelable & non-returnable items|Y
01|8646|1|1|C50FHM-ER32-210|Y
01|8650|1|1|Net Cost reflects Coolant Nuts Tubes and Backup Adjust|Y
01|8650|1|2|Screw installed at Lynden-Nikken before shipping.|Y
01|8650|3|1|Price reflects item being installed at Lyndex-Nikken|Y
01|8650|3|2|prior to shipping.|Y
01|8650|4|1|Price reflects item being installed at Lyndex-Nikken|Y
01|8650|4|2|prior to shipping.|Y
01|8650|5|1|Price reflects item being installed at Lyndex-Nikken|Y
01|8650|5|2|prior to shipping.|Y
01|8712|1|1|C50FHM-ER32-210|Y
01|8714|7|1|** Special need to quote|Y
01|8725|2|1|K32-ZMAC25-100|Y
01|8734|2|1|PART # CAT40-Q34-110U|Y
01|8752|1|1|Repair of customer's 1x CNC260 s/n: n/a.|Y
01|8752|1|2|Reference RGA# T-44006|Y
01|8785|1|1|Repair of customer's 1x 5AX-300 s/n: 5229|N
01|8785|1|2|Reference RGA# T-43562|Y
01|8785|19|1|81105T2 is the complete set.  Only replacing the|Y
01|8785|19|2|thrust bearing out of the set.|Y
01|8785|24|1|GM4050F-1E: Glentek Motor|Y
01|8785|25|1|KS-AX300R-FA3TB: Motor Cover|Y
01|8785|26|1|KS-AX300R-G85T: Motor Cover|Y
01|8785|27|1|KS-AX300R-G84R: Motor Cover|Y
01|8785|28|1|KS-AX300R-G85T: Motor Cover|Y
01|8785|29|1|Direct Mount Cables|Y
01|8850|3|1|PART # SP26-9-45|Y
01|8850|7|1|PART # SP26-16-60|Y
01|8850|12|1|PART # SP9-9-30|Y
01|8850|13|1|PART # SP9-9-45|Y
01|8850|17|1|PART # SP16-16-30|Y
01|8850|20|1|PART # SP20-20-45|Y
01|8856|1|1|Repair of customer's 1x CAT50U-AHC1.1/4-210-90|Y
01|8856|1|2|s/n: Aci-01851|Y
01|8856|1|3|Reference RGA# R44037|Y
01|8867|1|1|Repair of customer's 1x NK103-12000 s/n: AL016|Y
01|8867|1|2|Reference RGA# R-44024|Y
01|8867|2|1|Bearings seals and o-rings plus labor.|Y
01|8868|1|1|Seco part Number:  HSK-100A-UMC-4.53-1000|Y
01|8868|2|1|Seco part Number: HSK-100A-UMC-4.53-1250|Y
01|8868|3|1|Seco Part Number: HSK-100A-UMC-4.92-2000|Y
01|8891|1|1|Repair of customer's 1x 5AX-130FA s/n: 1064|Y
01|8891|1|2|Reference RGA# T-43988|Y
01|8910|1|1|Repair of customer's 1x PF-1|Y
01|8910|1|2|Reference RGA# 44033|Y
01|8910|2|1|Spring Washer|Y
01|8910|3|1|Screw M4x0.7|Y
01|8910|4|1|Capscrews M2.5x0.4|Y
01|8910|5|1|N Style Batteries|Y
01|8970|1|1|Repair of customer's 1x NC5-63-SK10C-90 and|Y
01|8970|1|2|1x NC5-63-SZF16-105|Y
01|8970|1|3|Reference RGA# R-44065|Y
01|8970|2|1|Clean up and Re-grease of customer's 1x NC5-SK10C-90|Y
01|8970|2|2|and 1x NC5-SZF16-105|Y
01|8970|3|1|S-10 O-ring|Y
01|8970|5|1|Install and adjust cam ring(S.9SZF16-RING)|Y
01|9006|1|1|Non-cancelable & non-returnable item|Y
01|9034|1|1|Repair of customer's 1x 5AX-130FA s/n: 1530|Y
01|9034|1|2|Reference RGA# T-44012|Y
01|9034|3|1|Recommended to re-plate Rotary Spindle.|Y
01|9132|1|1|Non-cancelable & non-returnable item|Y
01|9155|1|1|Discount reflects used non-returnable tooling.|Y
01|9167|1|1|Repair of customer's 1x CNCZ180LYA-BR s/n: 12047|Y
01|9167|1|2|Reference RGA# T-44083|Y
01|9197|1|1|This is a non-cancelable & non-returnable item.|Y
01|9199|1|1|Net Price Only|Y
01|9208|1|1|Cost of standard arbor screw subtracted from the holder|Y
01|9208|1|2|cost. Will be switched out w/ slotted screw.|Y
01|9208|5|1|Coolant Port Modification|Y
01|9218|1|1|Repair of customer's 1x MZMP46-ER32Z-C s/n: 51336 02|Y
01|9218|1|2|Reference RGA# R-44078|Y
01|9218|2|1|Part and Labor.|Y
01|9218|2|2|Replace all bearings seals and O-Rings.|Y
01|9218|2|3|Resurface Spindles.|Y
01|9301|1|1|Repair of customer's 1x CNC180 s/n: 6381|Y
01|9301|1|2|Reference RGA# T-44130|Y
01|9313|4|1|SET: TCL-BD (Base) and TCL-63HD (Head)|Y
01|9351|1|1|Catalog non-stock item. Non-cancellable/non-returnable.|Y
01|9381|1|1|Face Turning 25X25 Static Holder|Y
01|9381|2|1|40mm Boring Bar Holder-coolant|Y
01|9381|5|1|H103-37110 Coolant Nozzle|Y
01|9384|2|1|*8 gage length|Y
01|9388|3|1|NC4006-0625-3.00 w/ 2-Hole DIN Modification|Y
01|9388|4|1|NC4006-0750-3.00 w/ 2-Hole DIN Modification.|Y
01|9388|5|1|NC4016-0750-4.00 w/ 2-Hole DIN Modification.|Y
01|9388|6|1|NC4006-1000-4.00 w/ 2-Hole DIN Modification.|Y
01|9388|7|1|NCAT40-C1-85U w/ 2-Hole DIN Modification.|Y
01|9424|1|1|9pc left in stock!|Y
01|9471|1|1|Repair of customer's 1x CAT50U-AHC1.1/4-210-90|Y
01|9471|1|2|Reference RGA# R-44121|Y
01|9471|4|1|#50-AH-ORB|Y
01|9479|1|1|Repair of customer's 1x FP-2|Y
01|9479|1|2|Reference RGA# R-44107|Y
01|9490|1|1|Repair of customer's 1x T32216A02 s/n: A0380|Y
01|9490|1|2|Reference RGA# R-44015|Y
01|9490|2|1|Repair parts: bearings and seals|Y
01|9490|2|2|Labor|Y
01|9490|3|1|For upgrade to T32216B03 (see e-mail)|Y
01|9498|1|1|Net Price Only|Y
01|9505|1|1|NBT40-SF1000-3.54 Qt 4/17|Y
01|9505|2|1|NBT40-SF0750-3.54  Qt 4/17|Y
01|9505|3|1|NBT40-FMA25.4-45 Qt 4/17|Y
01|9505|4|1|BT40-SK10-60P  Qt 4/17|Y
01|9505|5|1|BT40-SK16-60P   Qt 4/17|Y
01|9607|3|1|SP26-9-45|Y
01|9607|7|1|SP26-16-60|Y
01|9607|11|1|SP9-9-30|Y
01|9607|12|1|SP9-9-45|Y
01|9607|16|1|SP16-16-30|N
01|9607|19|1|SP20-20-45|N
01|9607|27|1|SP26-20-90|N
01|9632|1|1|Repair of customer's 1x CNC202LFA s/n: 2680 T|Y
01|9632|1|2|Reference RGA# T-44112|Y
01|9632|22|1|M5x25L Cap Bolt|Y
01|9713|1|1|Repair of customer's 1x CNC200MA s/n: 3696|Y
01|9713|1|2|Reference RGA# T-44168|Y
01|9721|21|1|Snap Ring|Y
01|9721|22|1|Snap Ring|Y
01|9723|1|1|This is a non-cancelable & non-returnable item.|Y
01|9724|1|1|Repair of customer's 1x T32160A06 s/n: A0070|Y
01|9724|1|2|Reference RGA# R-44093|Y
01|9724|2|1|Bearings Seals and Spindle Shaft plus Labor|Y
01|9726|2|1|This is a non-cancelable & non-returnable item.|Y
01|9727|2|1|Option 1 - Slotted Arbor Screw|Y
01|9727|3|1|Option 2 - Coolant Ports Modification|Y
01|9741|21|1|Snap Ring|Y
01|9741|22|1|Snap Ring|Y
01|9849|6|1|Single 1 holder - Dual holders not available from LN|Y
01|9915|2|1|$70 / a holder Din Modification|Y
01|9915|2|2|The customer needs to sign off on DWG.|Y
01|9915|2|3|This is a non-cancelable & non-returnable item.|Y
01|10008|1|1|Repair customer's 1x B50RAM-MI63-225C-110 s/n: 53120 01|Y
01|10008|1|2|Reference RGA# R-44053|Y
01|10008|2|1|Replacing MI System Locking ring & components + Labor|Y
01|10015|1|1|Repair of customer's 1x CAT50 3/4 Milling Chuck 105mm|Y
01|10015|1|2|Reference RGA# R-44178|Y
01|10022|8|1|Cost of a new unit.|Y
01|10030|1|1|Repair of customer's 1x CNC202LFA s/n: 8145|Y
01|10030|1|2|Reference RGA# T-44111|Y
01|10053|28|1|KS-CN180L-FA206 Motor Cover|Y
01|10053|28|2|Delivery will be 3-4 weeks|Y
01|10058|1|1|Repair of customer's 1x MZMP5-SB1000X s/n: 51144 02|Y
01|10058|1|2|Reference RGA# R-44136|Y
01|10058|2|1|Repair parts for 1x MZMP5-SB1000X s/n: 51144 02|Y
01|10058|2|2|Resurface spindle Housing components and Internal head|Y
01|10058|2|3|parts need to be replaced.|Y
01|10058|2|4|Bearings and seals also need to be replaced.|Y
01|10058|2|5|Plus labor charge.|Y
01|10061|1|1|Repair of customer's 1x TAT-170 s/n: 1781|Y
01|10061|1|2|Reference RGA# T-44115|Y
01|10069|1|1|Repair of customer's 1x TAT-170 s/n: 3283|Y
01|10069|1|2|Reference RGA# T-44114|Y
01|10092|1|1|Repair of customer's 1x PF-2|Y
01|10092|1|2|Reference RGA# R-44211|Y
01|10094|1|1|Repair of customer's 1x 10000054 s/n: 4919 05|Y
01|10094|1|2|Reference RGA# R-44022|Y
01|10094|2|1|Replace bearings and seals spindle needs resurfacing|Y
01|10094|2|2|and labor charges.|Y
01|10123|1|1|Repair customer's 1x B50RAM-MI63-225C-110 s/n: 53120 01|Y
01|10123|1|2|Reference RGA# R-44053|Y
01|10123|2|1|Replacing MI system Locking ring & components|Y
01|10123|2|2|plus labor charge.|Y
01|10144|1|1|Repair of customer's 1x 5AX-151ZA s/n: 0011|Y
01|10144|1|2|Reference RGA# T-43072|Y
01|10144|3|1|Spindle re-grinding and plating.|Y
01|10164|1|1|HSK50A-NPU8-118|Y
01|10320|1|1|Repair of customer's:|Y
01|10320|1|2|1x MNL12-ER32X s/n: A7526|Y
01|10320|1|3|1x MNL12-ER32Z s/n: A2467|Y
01|10320|1|4|1x MNL12-ER32Z-MS s/n: A1816|Y
01|10320|2|1|Repair parts for: 1x MNL12-ER32X s/n: A7526|Y
01|10320|2|2|Spindle Shaft Collet Nut Clutch Tongue bearings|Y
01|10320|2|3|seals and Labor charge.|Y
01|10320|3|1|Repair parts for: 1x MNL12-ER32Z s/n: A2467|Y
01|10320|3|2|Drive Shaft collet nut clutch tongue bearings|Y
01|10320|3|3|seals and labor charge.|Y
01|10320|4|1|Repair parts for: 1x MNL12-ER32Z-MS s/n: A1816|Y
01|10320|4|2|Drive shaft collet nut clutch tongue bearings|Y
01|10320|4|3|seals and labor charge.|Y
01|10321|1|1|Tooling Certificate Number: 8112-446-042514|Y
01|10345|1|1|B45-1500H-SP  BT45 taper Retention Knob for Matsura|Y
01|10345|1|2|MC1000 VG Coolant Through machine|Y
01|10348|1|1|Repair of customer's 1x CAT40-Z12-130U|Y
01|10348|1|2|Reference RGA# R-44212|Y
01|10348|3|1|3/16 ball bearing|Y
01|10357|3|1|E50-064(C)|Y
01|10425|1|1|**Gage length of 3.5|Y
01|10425|2|1|**Gage length of 2.75|Y
01|10449|1|1|*Discontinued*|Y
01|10449|2|1|*Discontinued*|Y
01|10449|3|1|*Discontinued*|Y
01|10449|55|1|*Substitute for TCL-100GH|Y
01|10519|1|1|Repair of customer's 1x CNCZ180LSA3 s/n: n/a|Y
01|10519|1|2|Reference RGA# T-44263|Y
01|10558|1|1|Repair of customer's 1x CNC201 s/n: 1468|Y
01|10558|1|2|Reference RGA# T-44120|Y
01|10579|3|1|*Crossed from Parlec C4037EM6 Parlec gage 6|Y
01|10579|3|2|**Lyndex-Nikken gage 5|Y
01|10608|1|1|Repair of customer's 1x 5AX-350FA-R36 s/n: 3547|Y
01|10608|1|2|Reference RGA# T-43921|Y
01|10622|1|1|Repair of customer's:|Y
01|10622|1|2|1x CAT40-NPU13-105U|Y
01|10622|1|3|1x NMTB30-NPU13-100|Y
01|10622|2|1|Repair parts for 1x CAT40-NPU13-105U|Y
01|10622|4|1|4mm Ball Bearings|Y
01|10622|6|1|Repair parts for 1x NMTB30-NPU13-100|Y
01|10631|1|1|Repair of customer's 1x CNCZ180 s/n: 10772|Y
01|10631|1|2|Reference RGA# T-44234|Y
01|10681|3|1|Setting Fixture for OKL3-ER32X|Y
01|10681|4|1|Setting Fixture for OKL3-ER32Z|Y
01|10681|5|1|Wrench to be used w/ both units on this quote.|Y
01|10686|1|1|Repair of customer's 1x CNC200 s/n: 3687|Y
01|10686|1|2|Reference RGA# T-44303|Y
01|10699|1|1|BT30-C1-75|Y
01|10699|3|1|NBT30-C1-75 Taper Plus Milling Chuck.|Y
01|10713|1|1|Repair of customer's 1x C40RAM-ER25-180OT-80 s/n 825201|Y
01|10713|1|2|Reference RGA# R-44226|Y
01|10713|2|1|Spindle needs to be resurfaced.|Y
01|10713|2|2|Bearings and seals need to be replaced + Labor.|Y
01|10734|1|1|Repair of customer's 1x MNL12-ER40X s/n: A0188|Y
01|10734|1|2|Reference RGA# R-44209|Y
01|10734|2|1|Cover needs to be replaced bearings and seals need to|Y
01|10734|2|2|be replaced + Labor charge.|Y
01|10741|1|1|Repair of customer's|Y
01|10741|1|2|1x MNL12-ER32Z-MS (T32216B03) s/n: A1243|Y
01|10741|1|3|Reference RGA# R-44238|Y
01|10741|2|1|Bearings and seals need to be replaced.|Y
01|10741|2|2|Labor charges.|Y
01|10790|2|1|Above retention knob is coolant capable|Y
01|10803|1|1|2-Flat Pin Style|Y
01|10810|1|1|Repair of customer's 1x C5005-0875|Y
01|10810|1|2|Reference RGA# R-44300|Y
01|10903|1|1|Repair of customer's 1x CNC202LFA s/n: 7491|Y
01|10903|1|2|Reference RGA# T-44108|Y
01|10930|1|1|Repair of customer's 1x 5AX-350RA-R36 s/n: 3525|Y
01|10930|1|2|Reference RGA# T-44169|Y
01|10930|42|1|Labor for Repair: 1x 5AX-350FA-R36 s/n: 3525|Y
01|10930|43|1|Labor for hydraulic and airlines.|Y
01|10967|1|1|Repair of customer's 1x HP-150|Y
01|10967|1|2|Reference RGA# R-44278|Y
01|10967|2|1|HP-150 needs to be recalibrated.|Y
01|10978|1|1|*2-FLAT PIN STYLE / 80mm pitch|Y
01|10978|2|1|*2-FLAT PIN STYLE  / 80mm Pitch|Y
01|10995|1|1|O ring for SKJ20-20|Y
01|11003|1|1|Repair of customer's 1x C50RAM-ER32-180TS s/n: 7117 01|Y
01|11003|1|2|Reference RGA# R-44290|Y
01|11003|2|1|Repair parts for customer's 1x C50RAM-ER32-180TS|Y
01|11003|2|2|Spindle needs to be resurfaced.|Y
01|11003|2|3|Housing components bearings and seals need to be|Y
01|11003|2|4|replaced.  Plus labor charges.|Y
01|11028|1|1|*PIN STYLE TBD AT LATER DATE: (2-flat or taper)|Y
01|11033|4|1|*wrench sold separate|Y
01|11051|1|1|Tooling Certificate  Number to be determined.|Y
01|11051|2|1|Tooling certificate number to be determined.|Y
01|11066|1|1|6 Projection|Y
01|11066|2|1|6 Projection|Y
01|11066|3|1|6 Projection|Y
01|11066|4|1|6 Projection|Y
01|11072|1|1|Repair of customer's 1x HP-6|Y
01|11072|1|2|Reference RGA# R-44261|Y
01|11072|2|1|HP-6 needs to be recalibrated.|Y
01|11090|1|1|Ref. quotation #10622|Y
01|11090|1|2|In place of repair on NMTB30-NPU13-100|Y
01|11095|1|1|Repair of customer's 1x CNC170 s/n: 5886|Y
01|11095|1|2|Reference RGA# T-44277|Y
01|11114|4|1|*wrench sold separate|Y
01|11172|1|1|Repair of customer's 1x CNCZ180 s/n: 12048|Y
01|11172|1|2|Reference RGA# T-44084|Y
01|11256|1|1|CAT40-C1.1/4SL-85U-DIN-M|Y
01|11256|3|1|CAT40-C1.1/4SL-105U-DIN-M|Y
01|11256|5|1|CAT40-C1.1/4SL-120U-DIN-M|Y
01|11263|1|1|10 in stock @ Nikken|Y
01|11290|1|1|Lyndex-Nikken Quotation# 4241-NIK14|Y
01|11303|1|1|*With return of NT unit*|Y
01|11303|2|1|*Without return of NT tool unit*|Y
01|11315|1|1|Delivery = 1pc - 1 wk & 4pcs - 8 wks|Y
01|11335|1|1|The item is non-cancelable & non-returnable item|Y
01|11377|1|1|CCKL42 Disc Wrench|Y
01|11443|5|1|NC4027-0011-6.00|Y
01|11443|5|2|*TaperPlus CAT40 ER11 w/ 6 GL*|Y
01|11444|3|1|The items is non-cancelable & non-returnable item.|Y
01|11455|1|1|NON-RETURNABLE ALL SALES ARE FINAL|Y
01|11465|1|1|Repair of customer's 1x CNC250LOSP s/n: 4834|Y
01|11465|1|2|Reference RGA# T-44245|Y
01|11503|4|1|Lower Spacer|Y
01|11503|5|1|Lower Spacer|Y
01|11503|6|1|Upper Spacer|Y
01|11503|7|1|Upper Spacer|Y
01|11503|8|1|Upper Spacer|Y
01|11503|9|1|Upper Spacer|Y
01|11503|10|1|Upper Spacer|Y
01|11503|11|1|Upper Spacer|Y
01|11503|12|1|Upper Spacer|Y
01|11503|13|1|Upper Spacer|Y
01|11503|14|1|Upper Spacer|Y
01|11503|15|1|Upper Spacer|Y
01|11533|4|1|Replacement Collet for RA-200|Y
01|11533|4|2|Part # CHS-3.175 1/8 Collet|Y
01|11535|1|1|Black Anodized|Y
01|11580|4|1|NBT50-SK10C-200|Y
01|11595|2|1|CAT40-SF20-120|Y
01|11612|1|1|*tapered pin|Y
01|11612|2|1|**Customer to modify block as needed|Y
01|11631|5|1|KS-CN180L-FA206 Motor Cover|Y
01|11738|12|1|Baker's Dozen Promotion|Y
01|11747|1|1|*N29119|Y
01|11753|1|1|*Non-returnable and cannot be cancelled.|Y
01|11871|3|1|GL 4.00''|Y
01|11871|4|1|GL 2.00''|Y
01|11879|1|1|Modify 1x CAT40-SZF25-120U with DIN holes|Y
01|11879|2|1|Modify 1x CAT40-SZF16-105U with DIN holes|Y
01|11879|3|1|Modify 3x CAT40-SZF16-120U with DIN holes|Y
01|11879|4|1|Modify 1x CAT40-SZF10-120U with DIN holes|Y
01|11880|1|1|*Non-returnable / W2 condition|Y
01|11898|16|1|Mimatic Part No. 127421|Y
01|11898|17|1|Mimatic Part No. 112369|Y
01|11924|1|1|Repair of customer's 1x C40RA-0025 s/n: n/a|Y
01|11924|1|2|Reference RGA# R-44340|Y
01|11937|1|1|16 ETA 1-2 wks balance in 8-10 wks.|Y
01|11937|2|1|7 ETA in 1-2 weeks.|Y
01|11951|1|1|Repair of customer's 1x 5AX-130ZA s/n: n/a|Y
01|11951|1|2|Reference RGA# T-44252|Y
01|11976|1|1|*3.13 gage length|Y
01|11978|1|1|Net Price Only|Y
01|11978|2|1|Net Price Only|Y
01|11978|3|1|Net Price Only|Y
01|11978|4|1|Net Price Only|Y
01|11997|2|1|*Special: Non-cancellable & non-returnable upon reciept|Y
01|11997|2|2|of a firm PO*|Y
01|12001|1|1|Repair of customer's 1x OK101-79000 s/n: AL004|Y
01|12001|1|2|Reference RGA# R-44338|Y
01|12001|2|1|Replacing bearings and seals plus labor charges.|Y
01|12057|1|1|OKA00-20040 Rear Wedge (right)|Y
01|12057|2|1|OKA00-19020 Front Plate (Left)|Y
01|12080|1|1|Repair of customer's 1x 5AX-550 s/n: 1112|Y
01|12080|1|2|Reference RGA# T-44371|Y
01|12089|1|1|Repair of customer's 1x PF-2|Y
01|12089|1|2|Reference RGA# R-44439|Y
01|12100|1|1|Repair of customer's NC5-46 Tool Holders.|Y
01|12100|1|2|Reference RGA# R-44399|Y
01|12100|2|1|Repair parts for 1x S-NC5-46-FMA38.1CS-45-M|Y
01|12100|5|1|Cleaning and reassembling holder.|Y
01|12100|6|1|Repair parts for 1x S-NC5-46-FMA38.1CS-45-M|Y
01|12100|9|1|Cleaning and reassembling holder.|Y
01|12100|10|1|Repair parts for 1x S-NC5-46-FMA38.1CS-45-M|Y
01|12100|10|2|Repair parts for 2x S-NC5-46-FMA31.75CS-45-M|Y
01|12100|10|3|Please note: All parts are re-usable for these holders.|Y
01|12100|10|4|However the taper cone is a little worn.  Customer has|Y
01|12100|10|5|the option to replace the taper cone.|Y
01|12100|11|1|Taper Cone is optional.|Y
01|12100|12|1|Cleaning and reassembling holders.|Y
01|12109|1|1|Repair of customer's C50RAM-MI50-180 s/n: 46601 01|Y
01|12109|1|2|Reference RGA# Q-43827|Y
01|12109|2|1|Replace mounting positioning bolt and evaluation.|Y
01|12130|1|1|Repair of 1x CAT50U-AHC1.1/4-210 s/n: Acb-01764|Y
01|12130|1|2|and CAT50U-AHC1.1/4-210 s/n: Azk-08364|Y
01|12130|1|3|Reference RGA# R-44315|Y
01|12130|2|1|Repair of CAT50U-AHC1.1/4-210 s/n: Azk-08364 will be|Y
01|12130|2|2|covered under warranty no charge to the customer.|Y
01|12130|3|1|Repair parts for CAT50U-AHC1.1/4-210 s/n: Acb-01764|Y
01|12159|1|1|Repair of customer's 1x CNC250LOSP s/n: 4177|Y
01|12159|1|2|Reference RGA# T-44286|Y
01|12176|1|1|Repair of customer's 1x CNC250LOSP s/n: 4175|Y
01|12176|1|2|Reference RGA# T-44285|Y
01|12195|1|1|Repair of customer's 1x CNC180FA s/n: 6378|Y
01|12195|1|2|Reference RGA# T-44407|Y
01|12203|1|1|Repair of customer's 1x CNC250FA-H s/n: 3123|Y
01|12203|1|2|Reference RGA# T-44347|Y
01|12205|1|1|Reference Lyndex-Nikken Quotation Number: 2221-2014|Y
01|12205|1|2|Delivery is 12 weeks upon reciept of a purchase order.|Y
01|12256|1|1|Repair of customer's 1x CNC401 s/n: n/a|Y
01|12256|1|2|Reference RGA# T-44327|Y
01|12371|1|1|Balance in 1-2 weeks|Y
01|12371|2|1|Balance in 1-2 weeks|Y
01|12417|1|1|Pratt & Whitney special pricing|N
01|12426|1|1|PART # HSK50A-SK16C-120|Y
01|12535|1|1|Repair of customer's 1x PF-2|Y
01|12535|1|2|Reference RGA# R-44477|Y
01|12596|1|1|Repair of customer's 1x PF-2|Y
01|12596|1|2|Reference RGA# R-44472|Y
01|12596|2|1|PF-2 needs to be re-calibrated.|Y
01|12605|1|1|Repair of customer's CAT50-C1.1/4H-135U|Y
01|12605|1|2|Reference RGA# R-44200|Y
01|12608|1|1|Repair of customer's 1x CAT40-UMT200|Y
01|12608|1|2|Reference RGA# R-44470|Y
01|12608|2|1|Needs to be re-calibrated.|Y
01|12612|1|1|Repair of customer's 1x CAT50-C3/4-135U|Y
01|12612|1|2|Reference RGA# R-44445|Y
01|12646|18|1|please convert High speed chucks to standard asap|N
01|12662|1|1|Repair of customer's 1x CNC401 s/n: 4019|Y
01|12662|1|2|Reference RGA# T-44272|Y
01|12674|1|1|This is non-cancelable & non-returnable item.|Y
01|12674|1|2|2 weeks|Y
01|12700|1|1|This is a non-cancelable & non-returnable item.|Y
01|12703|2|1|Pricing is part of package with purchase of SF machine|Y
01|12755|1|1|Repair of customer's 125310 s/n: n/a.|Y
01|12755|1|2|Reference RGA# R-44355|Y
01|12755|2|1|Replace damaged internal hard parts.|Y
01|12755|2|2|Recondition worn spindles|Y
01|12755|2|3|Replace all bearings and seals.|Y
01|12755|2|4|Labor charges.|Y
01|12782|1|1|ETA 1-2 wks|Y
01|12810|1|1|Repair of customer's CNC180-2W-250YA-M s/n: 15467T|Y
01|12810|1|2|Reference RGA# T-44431|Y
01|12830|1|1|Repair of customer's CNC180-2W-250YA-M s/n: 15467T|Y
01|12830|1|2|Reference RGA# T-44431|Y
01|12830|9|1|CNC180-2W Table B|Y
01|12859|1|1|Repair of customer's CNC180 s/n: 7940|Y
01|12859|1|2|Reference RGA# T-44509|Y
01|12879|1|1|Replacement for un-repairable holder|Y
01|12879|1|2|Reference RGA# R-44231|Y
01|12883|1|1|Replacement for un-repairable HSK63A-TC0562 sent in on|Y
01|12883|1|2|RGA# Q-44420|Y
01|12901|1|1|Per Lyndex-Nikken Quote 4368-NIK14|Y
01|12930|1|1|Repair of customer's 1x T32216B02 s/n: A0848|Y
01|12930|1|2|Reference RGA# R-44475|Y
01|12930|2|1|Replace Drive Shaft gears bearings and seals.|Y
01|12930|2|2|Plus labor charges.|Y
01|12936|1|1|Repair of customer's 1x T32216 s/n: A0881|Y
01|12936|1|2|Reference RGA# R-44486|Y
01|12936|2|1|Replacing bearings and seals plus labor charges|Y
01|13002|1|1|Repair of customer's 1x CNC202LFA s/n: 8002|Y
01|13002|1|2|Reference RGA# T-44109|Y
01|13002|8|1|Labor is for repair and installation of missing parts|Y
01|13002|8|2|quoted below.|Y
01|13002|14|1|KS-CN180L-FA206 Motor Cover for CNC202LFA s/n: 8002|Y
01|13029|1|1|5 ETA 1 wk 5 ETA 2 wks|Y
01|13029|2|1|38512 - Cap Screw|Y
01|13029|2|2|ETA 2 wks|Y
01|13058|1|1|Net Price Only|Y
01|13058|1|2|This is a non-cancelable & non-returnable item.|Y
01|13088|1|1|Repair of customer's 1x CAT50-UMT200|Y
01|13088|1|2|Reference RGA# R-44499|Y
01|13088|2|1|Unit needs to be re-calibrated.|Y
01|13108|3|1|Modification & Chip Installation per each holder|Y
01|13108|4|1|Balancing charge is per each holder|Y
01|13153|1|1|Discount of 10% has been given due to this being a|Y
01|13153|1|2|factory refurbished Mother Board.|Y
01|13164|1|1|Repair of customer's 1x CAT40-NPU13-105U|Y
01|13164|1|2|Reference RGA# R-44572|Y
01|13182|2|1|*1 pc in Used Inventory*|Y
01|13237|1|1|Repair of customer's 1x PF-2|Y
01|13237|1|2|Reference RGA# R-44556|Y
01|13332|1|1|Ref. T00186|Y
01|13337|1|1|Repair of customer's 1x FP-2|Y
01|13337|1|2|Reference RGA# R-44562|Y
01|13337|3|1|Battery|Y
01|13337|4|1|Unit must be re-calibrated.|Y
01|13338|1|1|Spec: D51 L23 M40x1.5  - Spanner|Y
01|13343|1|1|Repair of customer's 1x HSK63A-C3/4-95G|Y
01|13343|1|2|Reference RGA# R-44550|Y
01|13346|1|1|This is a non-cancelable & non-returnable item.|Y
01|13357|1|1|Repair of customer's:|Y
01|13357|1|2|MZQT47-ER25X-OFF-HS s/n: 39355 02|Y
01|13357|1|3|MZQT47-ER25X-OFF-HS s/n: 51981 01|Y
01|13357|1|4|Reference RGA# R-44513|Y
01|13357|2|1|Repair of MZQT47-ER25X-OFF-HS s/n: 51981 01 will be a|Y
01|13357|2|2|warranty repair.|Y
01|13357|3|1|Repair price reflects discounted pricing due to missing|Y
01|13357|3|2|set screw for MZQT47-ER25X-OFF-HS s/n: 39355 02.|Y
01|13371|6|1|Lyndex-Nikken to modify blank at time of receiving|Y
01|13371|6|2|specs of customer's spindle for Okuma VMC|Y
01|13373|3|1|Delivery End of July|Y
01|13456|1|1|Repair of customer's 1x 5AX-2MT-105-120 s/n: n/a|Y
01|13456|1|2|Reference RGA# T-44468|Y
01|13466|1|1|This item is Non-cancelable & Non-returnable item.|Y
01|13466|1|2|No Makino Pin Need for Makino V33-I|Y
01|13466|2|1|This item is Non-cancelable & Non-returnable item.|Y
01|13466|2|2|No Makino Pin Need for Makino V33-I|Y
01|13475|1|1|NC5007-0040-6.00 - 2Lock Taper Plus ER40 w/ 6 gage|Y
01|13475|2|1|NC5007-0040-8.00 - 2Lock Taper Plus ER40 w/ 8 gage|Y
01|13475|3|1|Modification charge is Net Price per each holder above|Y
01|13475|4|1|Modification balance is Net Price per ea. holder above|Y
01|13503|1|1|Repair of customer's 5AX-2MT-105-120FA s/n: 6109|Y
01|13503|1|2|Reference RGA# T-44401|Y
01|13567|1|1|Repair of customer's MZQT47-ER25X-OFF-HS s/n: 51981 05|Y
01|13567|1|2|Reference RGA# R-44564|Y
01|13567|2|1|Need to replace all bearings seals and o-rings|Y
01|13567|2|2|plus labor charges.|Y
01|13586|3|1|non-cancelable & non-returnable item|Y
01|13664|1|1|non-cancelable & non-returnable item|Y
01|13675|1|1|10 pcs in 1-2 wks balance in 7 wks|Y
01|13675|2|1|10 pcs in < 1 wk balance in 7 wks|Y
01|13691|3|1|**After 2pc stock depleted - discontinued**|Y
01|13691|3|3|e|N
01|13703|1|1|3.97 dia. ball bearings|Y
01|13721|1|1|Repair of customer's 1x FP-2|Y
01|13721|1|2|Reference RGA# R-44620|Y
01|13721|2|1|Units needs new battery|Y
01|13721|3|1|Unit requires re-calibration.|Y
01|13747|1|1|*Catalog Non-Stock*|Y
01|13747|4|1|*Catalog Non-Stock*|Y
01|13782|1|1|*Closest crossover to Haimer 50.840.3/8Z.3*|Y
01|13782|2|1|*Closest crossover to Haimer 50.840.1/2Z.3*|Y
01|13820|2|1|non-cancelable & non-returnable item.|Y
01|13839|5|1|M4X12 Cap Screws|Y
01|13839|6|1|M4X12 Half Dog Screw|Y
01|13870|3|1|Custom Positioning Block - (price reflects net charge)|Y
01|13870|3|2|Please provide machine spindle drawing for custom block|Y
01|13881|1|1|Repair of customer's OKLB15M-ER32X s/n: A0482|Y
01|13881|1|2|Reference RGA# R-44413|Y
01|13881|2|1|Gear collet nut and spindle cover need to be replaced.|Y
01|13881|2|2|Bearing seals and o-rings also need to be replaced.|Y
01|13881|2|3|Plus labor charges.|Y
01|13941|4|1|*Price Pending*|Y
01|13941|5|1|*Price Pending*|Y
01|13955|1|1|5 pcs ETA 7-8 wks balance in 10-12 wks|Y
01|13964|1|1|Tooling Certificate Number: 8270-445-042514|Y
01|14024|4|1|OKA04-10090 - Setting Fixture|Y
01|14027|1|1|Customer sent in 1x CAT50-C3/4-105U for evaluation on|Y
01|14027|1|2|RGA# R-44647. It was deteremined the holder was|Y
01|14027|1|3|un-repairable additional 5% is being offered to|Y
01|14027|1|4|customer to replace the un-repairable holder.|Y
01|14040|1|1|Repair of customer's 1x CNC180 s/n: 15723|Y
01|14040|1|2|Reference RGA# T-44645|Y
01|14055|1|1|(2p) in stock (4p) Delivery Pending|Y
01|14083|1|1|This is a non-cancelable & non-returnable item|Y
01|14098|1|1|Net Price Only|Y
01|14100|1|1|*installed w/ HEX Style Nuts|Y
01|14100|2|1|*installed w/ HEX Style Nuts|Y
01|14101|3|1|For both OKEX-ER32Z & OKEX-ER32Z-C-7MP-MIM|Y
01|14101|4|1|For only the OKEX-ER32Z|Y
01|14101|5|1|For only the OKEX-ER32Z-C-7MP-MIM|Y
01|14146|10|1|*This item is at your net price*|Y
01|14153|1|1|Repair of various CAT50 Tool holders.|Y
01|14153|1|2|Reference RGA# R-44625|Y
01|14153|2|1|Repair of 1x C50UMC-1250L|Y
01|14153|2|2|No parts needed we will clean up and re-grease|Y
01|14153|2|3|existing parts.|Y
01|14153|3|1|Unit needs to be cleaned up and re-greased.|Y
01|14153|4|1|Repair of 1x CAT50-C1.1/4-105U|Y
01|14153|7|1|Install Roller Bearings and Nut. Clean tool holder and|Y
01|14153|7|2|re-grease unit.|Y
01|14153|8|1|Repair of 1x CAT50-C1.1/4-135U|Y
01|14153|12|1|Clean and re-grease holder plus installation of parts.|Y
01|14153|13|1|Repair of 1x CAT50-C1.1/4-135U|Y
01|14153|16|1|Clean and re-grease holder plus installation of parts.|Y
01|14153|17|1|Repair of 1x CAT50-C1.1/4-135U|Y
01|14153|19|1|Clean and re-grease holder plus installation of parts.|Y
01|14153|20|1|Repair of 1x CAT50-C1.1/4-135U|Y
01|14153|22|1|Clean and re-grease holder plus installation of parts.|Y
01|14153|23|1|Repair of 1x CAT50-C1.1/4-135U|Y
01|14153|26|1|Clean and re-grease holder plus installation of parts.|Y
01|14153|27|1|Repair of 1x C50UMC-1250L|Y
01|14153|29|1|Clean and re-grease holder plus installation of parts.|Y
01|14153|30|1|Repair of 1x CAT50-C1.1/4-135U|Y
01|14153|32|1|Clean and re-grease holder plus installation of parts.|Y
01|14173|1|1|Replacements for 3x un-repairable CAT50-MMC8C-105U|Y
01|14173|1|2|sent in for evaluation on RGA# R-44625|Y
01|14173|2|1|Replacements for 3x un-repairable CAT50-C1.1/4-135U|Y
01|14173|2|2|sent in for evaluation on RGA# R-44625.|Y
01|14173|3|1|Quoted to replace the CAT50-C1.1/4-105U we cannot|Y
01|14173|3|2|guarantee the TIR due to OD collet seat being damaged.|Y
01|14173|4|1|Quoted to replace the CAT50-C1.1/4-165U we cannot|Y
01|14173|4|2|guarantee the TIR due to OD collet seat being damaged.|Y
01|14186|1|1|MCT35-1: Quick change 1 milling chuck|Y
01|14186|8|1|DT35-NPU13: Quick change 1/2 keyless drill chuck|Y
01|14186|9|1|FT35-1: Quick change 1 face mill arbor|Y
01|14187|1|1|Repair of customer's 1x C50RAM-ER32-180 s/n: 7070156801|Y
01|14187|1|2|Reference RGA# R-44630|Y
01|14187|2|1|Bearings seals and o-rings need to be replaced.|Y
01|14187|2|2|Plus labor charges.|Y
01|14187|2|3|Normal repair time is 1-2 weeks.|Y
01|14187|3|1|Repair of C50RAM-ER32-180 s/n 70 701 568 01 to be|Y
01|14187|3|2|completed in 1-2 business days.|Y
01|14191|9|1|*This item at no charge as a courtesy*|Y
01|14230|2|1|**This item is not a standard stock item for|Y
01|14230|2|2|Lyndex-Nikken. Once ordered it cannot be cancelled|Y
01|14230|2|3|or returned.|Y
01|14261|1|1|Repair of customer's MNZ20-ER32X s/n: A0028|Y
01|14261|1|2|Reference RGA# R-44536|Y
01|14261|2|1|Collet nut bearings seals and o-rings must be|Y
01|14261|2|2|replaced plus labor charges.|Y
01|14275|6|1|This is a non-cancelable & non-returnable item.|Y
01|14275|25|1|This is a non-cancelable & non-returnable item.|Y
01|14278|1|1|*This item is listed at your net cost*|Y
01|14318|1|1|2.80mm dia steel ball|Y
01|14318|3|1|Repair of (2) T15-056 tap collets|Y
01|14318|3|2|Ref. Lyndex Nikken RGA#44465|Y
01|14399|1|1|BT40-DJ3-131|Y
01|14427|3|1|*This wrench is applicable for both live tools*|Y
01|14427|4|1|*This wrench is applicable for both live tools*|Y
01|14440|3|1|For shanks less than 10mm|Y
01|14440|4|1|For 10mm shanks and larger|Y
01|14442|1|1|BT40-DJ3-135A *Alternative to BT40-DJ3-131*|Y
01|14442|2|1|*Alternative to Q26-DJ3-36*|Y
01|14467|1|1|Repair of customer's 1x NSVZ300AA21 s/n: n/a|Y
01|14467|1|2|Reference RGA# T-44663|Y
01|14480|1|1|Net Price Only|Y
01|14480|1|2|This is a non-cancelable & non-returnable item|Y
01|14480|2|1|Net Price Only|Y
01|14480|2|2|This is a non-cancelable & non-returnable item|Y
01|14484|1|1|Repair of customer's 1x 5AX-2MT-105-120 s/n: n/a|Y
01|14484|1|2|Reference RGA# T-44468|Y
01|14484|36|1|M4121R023: Spindle for 5AX-2MT|Y
01|14515|1|1|Discount reflects Core Trade-In.|Y
01|14515|1|2|Reference RGA# R-44721|Y
01|14537|1|1|Part# 174154|Y
01|14537|2|1|Part# 123690|Y
01|14537|5|1|Part# 131538|Y
01|14537|7|1|Part# 124037|Y
01|14539|1|1|PART # HSK50A-SK16C-120|Y
01|14539|1|2|Holders are non-standard stock. One a purchase order is|Y
01|14539|1|3|placed it cannot be cancelled or returned.|Y
01|14651|2|1|Can substitute w/ B30-6000 listed below|Y
01|14668|1|1|Repair of customer's T32216B03 s/n: AL098|Y
01|14668|1|2|Reference RGA# R-44668|Y
01|14668|2|1|Replace Collet Nuts bearings seals and o-rings|Y
01|14668|2|2|plus labor charges.|Y
01|14669|1|1|6 Gauge Length|Y
01|14669|3|1|2.25 Gauge Length|Y
01|14669|5|1|5 Gauge Length|Y
01|14669|7|1|6 Gauge Length|Y
01|14669|9|1|3.13 Gauge Length|Y
01|14669|11|1|3.5 Gauge Length|Y
01|14669|13|1|105mm Gauge Length|Y
01|14669|15|1|9 Gauge Length|Y
01|14669|20|1|4 Gauge Length|Y
01|14684|1|1|Repair of customer's HSK100A-C3/4-135|Y
01|14684|1|2|Customer's HSK100A-C1-135 is un-repairable.|Y
01|14684|1|3|Reference RGA# R-44718|Y
01|14684|2|1|Repair parts for customer's HSK100A-C3/4-135 are|Y
01|14684|2|2|listed below:|Y
01|14684|7|1|Replacement for customer's un-repairable holder.|Y
01|14684|7|2|Please note normal discount it 35% additional discount|Y
01|14684|7|3|is for the replacement of customer's un-repairable|Y
01|14684|7|4|holder only.  Reference RGA# R-44718.|Y
01|14699|1|1|N5007-0750-4.50 w/ Black Oxide|Y
01|14704|2|1|*This item is listed at your net price and is|Y
01|14704|2|2|considered a catalog non-stock item*|Y
01|14713|1|1|Repair of customer's HP-100|Y
01|14713|1|2|Reference RGA# R-44677|Y
01|14713|3|1|Unit needs new cell batteries.|Y
01|14713|4|1|Unit requires re-calibration.|Y
01|14713|6|1|Quoted to replace the existing unit as we cannot|Y
01|14713|6|2|guarantee accuracy due to damage on the slide head.|Y
01|14713|6|4|Please note normal discount is 10% additional discount|Y
01|14713|6|5|is for the replacement against RGA# R-44677 only.|Y
01|14718|1|1|Repair of customer's PF-2|Y
01|14718|1|2|Reference RGA# R-44666|Y
01|14718|2|1|Requires new N Style Batteries.|Y
01|14730|2|1|*2pc pricing|Y
01|14757|1|1|NC4017-0032-4.00 : TaperPlus CAT40 ER32 collet chuck w/|Y
01|14757|1|2|a 4.00 GL|Y
01|14777|2|1|9HA30 for Nikken Quick Change Holders|Y
01|14805|1|1|Repair of customer's CNC250 s/n: 4523.|Y
01|14805|1|2|Reference RGA# T-44520|Y
01|14805|2|1|M8x30 Bolts for Worm Screw Housing.|Y
01|14805|3|1|Motor Cover for CNC250|Y
01|14811|1|1|B3501-0750-4.00|Y
01|14811|1|2|BT35 3/4 Shell Mill Holder w/ a 4 GL|Y
01|14811|2|1|B3501-0750-4.00|Y
01|14811|2|2|BT35 3/4 Shell Mill Holder w/ a 4 GL|Y
01|14829|2|1|Balance of 43 pcs in 1-2 wks|Y
01|14856|1|1|Above holder has 4 gage|Y
01|14856|2|1|Above holder has 6 gage|Y
01|14856|3|1|Above holder has 5 gage|Y
01|14860|7|1|Above holder is an additional pc @ N/C for this package|Y
01|14886|2|1|MODIFICATION FOR SINK HOLES INTO PILOT|Y
01|14911|1|1|Quoted to replace the CAT40-NPU13-105U sent in on|Y
01|14911|1|2|RGA# R-44728 for evaluation.|Y
01|14913|1|1|Repair of customer's PF-2.|Y
01|14913|1|2|Reference RGA# R-44700|Y
01|14913|2|1|Requires N Style batteries.|Y
01|14913|4|1|This part is optional the existing unit has holes|Y
01|14913|4|2|going through. If the customer is ok with the existing|Y
01|14913|4|3|LED unit please disregard this line item.|Y
01|14924|5|1|PART # TQW-GH6|Y
01|14931|1|1|Discount reflects replacement for un-repairable units|Y
01|14931|1|2|sent in on RGA# R-44465.|Y
01|14943|2|1|Balance of 43 pcs in 1-2 wks|Y
01|14952|1|1|Repair of customer's 5AX-350FA-R36 s/n: 3513.|Y
01|14952|1|2|Reference RGA# T-44560|Y
01|14957|1|1|Repair of customer's C40RA-0025 s/n: n/a|Y
01|14957|1|2|Reference RGA# R-44656|Y
01|14957|4|1|M3X6 Cap Screw|Y
01|14971|2|1|Balluff BIS0011 Data Chip Installation|Y
01|14973|3|1|16 pcs in used inventory|Y
01|15009|1|1|Repair of customer's 1x W10S5-0875|Y
01|15009|1|2|Reference RGA# R-44765|Y
01|15009|3|1|TC0875-14 #14 Steel Ball 4.5mm|Y
01|15009|4|1|TC0875-15 #15 Steel Ball 4mm|Y
01|15009|6|1|TC0875-10 #10 Spring|Y
01|15009|7|1|TC0875-04 #4 Stopper Bolt|Y
01|15009|8|1|TC0875-09 #9 Spring|Y
01|15009|13|1|Discount reflects replacement of customer's current|Y
01|15009|13|2|holder in for repair.  Delivery on the repair is 2-3|Y
01|15009|13|3|weeks.  Normal discount is 28%.  Reference RGA# R-44765|Y
01|15066|1|1|SPECIAL CAT40-SK16-235UP|Y
01|15066|1|2|REFERENCE LYNDEX-NIKKEN QUOTE 1254-NIK14|Y
01|15072|4|1|for ER40 unit|Y
01|15072|5|1|for ER40 unit|Y
01|15072|8|1|for CAT40 unit - nut and spindle wrench use same style|Y
01|15079|3|1|NXE-COOL: Air cylinder for NX5 Spindle Speeder|Y
01|15079|3|2|*Note that this item is listed at your NET cost*|Y
01|15105|1|1|CAT50-BAC32-165U|Y
01|15105|1|2|Delivery: 12-14 Weeks|Y
01|15105|1|3|Reference Lyndex-NIkken Quote XXXX-2014|Y
01|15109|1|1|Repair of customer's 5AX-200II s/n: 1394|Y
01|15109|1|2|Reference RGA# T-44659|Y
01|15112|2|1|*Note that this item is listed at your NET cost*|Y
01|15185|1|1|Appropriate wrenches to be quoted shorlty|Y
01|15186|1|1|*This item is listed at your NET cost*|Y
01|15210|1|1|This is a non-cancelable & non-returnable item.|Y
01|15211|1|1|*This item is listed at your NET cost. This special|Y
01|15211|1|2|Mimatic pricing is applicable for up to 4 pcs*|Y
01|15212|1|1|Season Promotion while Lyndex-Nikken stock qty last|Y
01|15212|1|2|This is a non-cancelable & non-returnable item.|Y
01|15214|1|1|*Note that this item is listed at your NET cost*|Y
01|15220|1|1|Repair of (1) C4005-0875-6.66|Y
01|15220|1|2|Ref. Lyndex Nikken RGA#44735|Y
01|15226|1|1|List Price Only|Y
01|15237|2|1|*2 pcs in Used Inventory*|Y
01|15256|2|1|We disassembled and cleaned all the valves on the pump|Y
01|15256|2|2|We are unable to test this unit at our facility.|Y
01|15265|2|1|AW02 Lock Washer|Y
01|15265|9|1|M4X8L Cap Screw|Y
01|15275|1|1|Repair of customer's HSK63F-C1-100G.|Y
01|15275|1|2|Reference RGA# R-44754|Y
01|15287|1|1|*Note that this item is listed at your NET cost|Y
01|15320|5|1|*Lyndex-Nikken to supply block|Y
01|15329|1|1|Repair of customer's CAT40-SZF16-120U|Y
01|15329|1|2|Reference RGA# R-44691|Y
01|15360|1|1|Nikken Tap Collet ZK38-1R  25mm shk X 20mm square|Y
01|15360|1|2|These items are not standard stock and are considered|Y
01|15360|1|3|special.  Once a purchase order is placed these items|Y
01|15360|1|4|may not be cancelled or returned.|Y
01|15360|1|5|This quotation is valid for 30 days.|Y
01|15360|1|6|Freight has not been quoted but will be added once|Y
01|15360|1|7|determined.Net price quoted based upon a one time|Y
01|15360|1|8|purchase order.|Y
01|15360|1|9|Delivery 14 to 15 weeks from time of order.|Y
01|15374|1|1|*This item is listed at your NET cost*|Y
01|15374|2|1|*This item is listed at your NET cost*|Y
01|15391|1|1|Repair of 1x CNC250LOSP s/n: 4333|Y
01|15391|1|2|Reference RGA# T-44791|Y
01|15434|1|1|Repair of customer's S1005-0562|Y
01|15434|1|2|Reference RGA# R-44741|Y
01|15434|8|1|Repair of customer's CAT40-Z12-103U|Y
01|15434|8|2|Reference RGA# R-44741|Y
01|15434|11|1|3/8 ball bearings|Y
01|15434|12|1|3/16 Ball Bearings|Y
01|15446|4|1|Hard Balance G2.5 @ 24000RPM w/ B30-4500 installed|Y
01|15451|1|1|3 pcs in stock at Lyndex-Nikken|Y
01|15460|3|1|*L/N Supply Special Size Block & Modify to Customer's|Y
01|15460|3|2|Machine Specs*|Y
01|15476|2|1|*This item at no charge as part of the SF machine*|Y
01|15476|9|1|*This item at no charge*|Y
01|15487|3|1|part# AB42-90-F|Y
01|15534|2|1|*Nut Wrench for MNL12-ER32X*|Y
01|15534|3|1|*Spindle Wrench for MNL12-ER32X*|Y
01|15534|5|1|WTO# 48-78996: Lyndex-Nikken Special MNL12-ID10Z-MS|Y
01|15534|5|2|1 ID/Face Holder for both Main & Sub Spindles|Y
01|15561|1|1|ref. 124021|Y
01|15561|2|1|ref. 124619|Y
01|15561|3|1|ref. 124864|Y
01|15561|4|1|ref. 117965|Y
01|15561|5|1|ref. 117999|Y
01|15561|6|1|ref. 124259|Y
01|15563|1|1|*Non-stock/Non-returnable|Y
01|15563|2|1|*Non-stock/Non-returnable|Y
01|15563|3|1|*Non-stock/Non-returnable|Y
01|15563|4|1|*Non-stock/Non-returnable|Y
01|15563|5|1|*Non-stock/Non-returnable|Y
01|15563|6|1|Nikken Part# ZQ40-16|Y
01|15569|2|1|C50RAM-ER40-260OT w/ external coolant|Y
01|15578|1|1|*This item is listed at your NET cost & is non-|Y
01|15578|1|2|cancellable & non-returnable upon reciept of a PO|Y
01|15583|1|1|Repair parts for customer's pancake cylinder brought in|Y
01|15583|1|2|by Armando.|Y
01|15588|3|1|Stock depleted @ 11 pcs balance = special|Y
01|15588|5|1|Stock depleted @ 8 pcs balance = special|Y
01|15588|7|1|Stock depleted @ 18 pcs balance = special|Y
01|15588|10|1|Stock depleted @ 19 pcs balance = special|Y
01|15588|12|1|Stock depleted @ 9 pcs balance = special|Y
01|15588|27|1|Stock depleted @ 11 pcs balance = special|Y
01|15588|31|1|Stock depleted @ 2 pcs balance = special|Y
01|15593|4|1|Hard Balance G2.5 @ 24000RPM w/ B30-4500 installed|Y
01|15625|1|1|Reference Lyndex-Nikken Quotation# 4436-NIK14|Y
01|15627|6|1|Nikken part# ZQ40-16|Y
01|15627|6|2|NonStop Z16 T/C Tap Holder|Y
01|15640|2|1|*DIN coolant through the flange. Note this item is|Y
01|15640|2|2|listed at your NET cost*|Y
01|15652|2|1|for collet chuck B4007-0032 (sold separate)|Y
01|15659|1|1|This is a non-cancelable & non-returnable item.|Y
01|15659|1|2|Season Promotion while stock qty last|Y
01|15659|2|1|Net Price Only|Y
01|15659|3|1|Net Price Only|Y
01|15659|4|1|Net Price Only|Y
01|15662|1|1|Additional discount is per Amira this is a one time|Y
01|15662|1|2|offer to have the end-user replace their crashed holder|Y
01|15662|1|3|instead of repairing.|Y
01|15667|1|1|*This item is listed at your NET cost*|Y
01|15667|2|1|*This item is listed at your NET cost*|Y
01|15700|1|1|S.NC5-46-SYJ13-A w/ PS-N46AE|Y
01|15700|2|1|S.NC5-63-SYJ20-A w/PS-N46AE|Y
01|15718|1|1|This is a non-cancelable & non-returnable item.|Y
01|15719|1|1|*Non-Cancellable & Non-returnable upon reciept of a PO*|Y
01|15729|17|1|Diametro de .03mm - 8mm|Y
01|15751|1|1|This item is listed at your NET cost.|Y
01|15754|1|1|Net Price Only|Y
01|15754|1|2|This is a non-cancelable & non-returnable item.|Y
01|15757|1|1|Net Price Only|Y
01|15757|1|2|This is a non-cancelable & non-returnable item.|Y
01|15757|2|1|Net Price Only|Y
01|15757|2|2|This is a non-cancelable & non-returnable item.|Y
01|15758|3|1|Wrench for both ER11 & TG25 collet chucks|Y
01|15758|6|1|Wrench for both ER11 & TG25 collet chucks|Y
01|15765|6|1|12 Gauge length|Y
01|15765|7|1|8 Gauge length|Y
01|15765|8|1|6 Gauge length|Y
01|15767|2|1|Re-calibration of holder customer wanted a ball type|Y
01|15767|2|2|stylus not the cylinder type that was originally on|Y
01|15767|2|3|the unit.|Y
01|15781|1|1|This is a non-cancelable & non-returnable item.|Y
01|15781|2|1|This is a non-cancelable & non-returnable item.|Y
01|15844|8|1|*This item at no charge*|Y
01|15870|5|1|Mimatic part# 174264: MZQT47-BG15Z-MD|Y
01|15870|5|2|*Note that this item is listed at your NET cost*|Y
01|15872|3|1|(#40 taper - Taper Pin)|Y
01|15896|4|1|*This item is listed at your NET price*|Y
01|15900|1|1|This is a non-cancelable & non-returnable item.|Y
01|15900|1|2|Season Promotion while qty last|Y
01|15900|2|1|This is a non-cancelable & non-returnable item.|Y
01|15901|1|1|This item is listed at your NET cost|Y
01|15971|3|1|SKJ25-21C: SK25 Series 21mm Sealed Coolant Cap|Y
01|15975|1|1|*This item is listed at your NET cost*|Y
01|15975|2|1|*This item is listed at your NET cost*|Y
01|15978|1|1|Discount reflects the Core Trade-in Program.|Y
01|15978|1|2|Reference RGA# R-44840|Y
01|16001|3|1|3 pcs - 1 week & balance = pending|Y
01|16015|1|1|Repair of customer's CAT40-NX5-153 s/n: Ha-004|Y
01|16015|1|2|Reference RGA# R-44844|Y
01|16046|1|1|9 pcs Stock & balance = end of October 2014|Y
01|16056|6|1|This item at no charge|Y
01|16073|2|1|5 pcs stock / 30 pcs - 3 wks & 15 pcs 8 weeks|Y
01|16073|4|1|35 pcs stock / 10 pcs 1 week & 5 pcs 8 weeks|Y
01|16082|1|1|This is a non-cancelable & non-returnable item.|Y
01|16097|2|1|For his old holder|Y
01|16136|4|1|Installation of AH by Lyndex-Nikken Engineering Staff|Y
01|16168|1|1|Reference SO# 630861|Y
01|16168|1|2|Convert to BT30-SK16-60|Y
01|16168|1|3|*Swap nuts re-etch and re-label|Y
01|16168|2|1|Install onto holders above.|Y
01|16168|2|2|-20 SKN-16B +20 SKN-16B(GH)|Y
01|16173|1|1|Repair of customer's 5AX-350FA-R36 s/n: 3515|Y
01|16173|1|2|Reference RGA# T-44871|Y
01|16179|8|1|Above positioning block is listed @ Net Price|Y
01|16180|1|1|This item is listed at your NET cost.|Y
01|16202|19|1|Lyndex alternative Pull Stud in stock for PS-1|Y
01|16209|1|1|Repair of customer's 1x T32214B03 s/n: n/a|Y
01|16209|1|2|Reference RGA# R-44829|Y
01|16209|2|1|Replace all bearings seals and o-rings + labor charges|Y
01|16237|1|1|Choose 11 holders in the sizes you choose|Y
01|16237|1|2|Included in price|Y
01|16237|2|1|giveaway|Y
01|16237|3|1|giveaway|Y
01|16237|4|1|giveaway|Y
01|16252|1|1|Please note 165 pcs is for 1 nut.  Please multiply by|Y
01|16252|1|2|3 if you will need needle roller bearings for all|Y
01|16252|1|3|3 nuts.|Y
01|16260|1|1|Tooling Certificate Number: 25000-485-080814|Y
01|16311|5|1|This item at no charge as a courtesy to the customer.|Y
01|16380|1|1|This is a non-cancelable & non-returnable item.|Y
01|16409|2|1|E/U may purchase to modify themselves per their machine|Y
01|16409|3|1|Labor charge for Custom Stop Block by Lyndex Nikken per|Y
01|16409|3|2|E/U machine specs.|Y
01|16421|1|1|#22721-5.5/C5021-0750-6.00|Y
01|16421|2|1|#22723-8|Y
01|16421|3|1|#21005-45C|Y
01|16423|1|1|Repair of customer's 5AX-130 s/n: 3929|Y
01|16423|1|2|Reference RGA# T-44804|Y
01|16434|1|1|Non Standard Stock Item|Y
01|16434|1|2|Purchased order cannot be cancelled and item cannot|Y
01|16434|1|3|be returned once a order is placed.|Y
01|16477|1|1|Ref. T00272|Y
01|16481|2|1|Part Number NK105-37000-ER25|Y
01|16481|2|2|Nakamura ER25 Straight 3600 RPM Ext Clnt Live Tool|Y
01|16481|2|3|Please note this is a non-standard special item.|Y
01|16481|2|4|Once a purchase order has been placed it cannot be|Y
01|16481|2|5|cancelled or returned.|Y
01|16481|2|6|Delivery is approx 12-16 Weeks + 1-2 Weeks for Shipping|Y
01|16488|1|1|ref. 1555-2541 A555-2541|Y
01|16525|1|1|CONVERTED w/ 6mm ball stylus|Y
01|16525|1|2|*No special ring sensor|Y
01|16546|1|1|For ATC|Y
01|16546|3|1|yor Hand Load Only|Y
01|16546|3|2|For Hand Load Only|N
01|16582|1|1|Repair of customer's PF-2|Y
01|16582|1|2|Reference RGA# R-44918|Y
01|16582|2|1|Unit needs to be re-calibrated.|Y
01|16583|4|1|SK25-25A|Y
01|16607|3|1|Slotted Arbor Screw Installed at Lyndex Nikken|Y
01|16607|3|2|Price reflects slotted Arbor Screw exchange for standrd|N
01|16684|1|1|Net Price Only|Y
01|16691|22|1|Non-returnable/Non-cancellable|Y
01|16693|1|1|Repair of customer's OKLB15M-ER32X s/n: A0249|Y
01|16693|1|2|Reference RGA# R-43389|Y
01|16693|2|1|The following items need to be replaced:|Y
01|16693|2|2|Clutch Spindle Cover and Spindle collet nut bearings|Y
01|16693|2|3|seals and o-rings.  Plus Labor.|Y
01|16702|1|1|Repair of customer's 5AX-120FA s/n: 8059|Y
01|16702|1|2|Reference RGA# T-44890|Y
01|16702|44|1|Expedite Fee for 1-Week Turn Around.|Y
01|16702|44|2|Table was received on 8/19 repair will be completed|Y
01|16702|44|3|and ready to ship by 8/26 pending a revised PO.|Y
01|16706|5|1|*DIN-coolant through flange|Y
01|16708|1|1|Motor Flange will be installed on customer's CNCZ250.|Y
01|16708|1|2|Reference RGA# T-44905|Y
01|16713|1|1|Net Price Only|Y
01|16713|1|2|This is a non-cancelable & non-returnable item.|Y
01|16716|1|1|Net Price Only|Y
01|16716|1|2|This is a non-cancelable & non-returnable item.|Y
01|16733|1|1|*giveaway|Y
01|16746|17|1|CN322T102|Y
01|16746|18|1|CN322T113|Y
01|16750|1|1|External coolant|Y
01|16782|3|1|M4X8 Button Socket Cap Screw|Y
01|16820|2|1|MCT45-1.1/4|Y
01|16857|20|1|H80F-SF0312-3.25B|Y
01|16857|21|1|HSK80F-ER32-4.84P|Y
01|16857|22|1|HSK80F-ER20-4.84P|Y
01|16857|23|1|TCL-80GH|Y
01|16867|2|1|Note that this item is listed at your NET cost.|Y
01|16891|10|1|*This item at no charge as a courtesy to the customer*|Y
01|16926|1|1|Repair of customer's 1x OK101-14000 s/n: AL0028 &|Y
01|16926|1|2|1x OK101-13000 s/n: AL0027|Y
01|16926|1|3|Reference RGA# R-44869|Y
01|16926|2|1|Repair of customer's OK101-14000 s/n: AL0028|Y
01|16926|2|2|Replacing Collet nut spindle gears bearings o-rings|Y
01|16926|2|3|and seals plus labor|Y
01|16926|3|1|Repairing customer's OK101-13000 s/n: AL0027|Y
01|16926|3|2|Replacing Collet nut bearings seals and o-rings.|Y
01|16926|3|3|Plus labor.|Y
01|16939|6|1|Is currently back order ETA 09/29/2014|Y
01|16940|2|1|Old Part# 155445|Y
01|16940|3|1|Old part# 121489|Y
01|16947|1|1|Net Price Only|Y
01|16947|1|2|This is a non-cancelable & non-returnable item.|Y
01|16950|1|1|124034|Y
01|16950|2|1|This item at no charge as a courtesy to the customer.|Y
01|16950|3|1|This item at no charge as a courtesy to the customer.|Y
01|16950|4|1|170318|Y
01|16950|5|1|152685|Y
01|16969|1|1|C8-C1-90 CAPTO8 1 Ultra Lock Milling Chuck 90mm GL|Y
01|16969|1|2|Quantities  1 to 19pcs|Y
01|16969|2|1|C8-C1-90 CAPTO8 1 Ultra Lock Milling Chuck 90mm GL|Y
01|16969|2|2|Quantities 20pcs +|Y
01|16976|1|1|N5001-1500-1.41-SP NMTB50 1.5 Pilot Shell Mill Holder|Y
01|16976|1|2|with Special 1.41 GL (L dimension)|Y
01|16976|1|3|Quantity  1 - 4 pieces|Y
01|16976|2|1|N5001-1500-1.41-SP NMTB50 1.5 Pilot Shell Mill Holder|Y
01|16976|2|2|with Special 1.41 GL (L dimension)|Y
01|16976|2|3|Quantities  5 - 9 pieces|Y
01|16976|3|1|N5001-1500-1.41-SP NMTB50 1.5 Pilot Shell Mill Holder|Y
01|16976|3|2|with Special 1.41 GL (L dimension)|Y
01|16976|3|3|Quantities 10pcs +|Y
01|16988|1|1|Repair of customer's FP-2.|Y
01|16988|1|2|Reference RGA# R-44957|Y
01|16988|2|1|Battery CR2032|Y
01|17008|1|1|Replacements for customer's un-repairable holders|Y
01|17008|1|2|sent in on RGA# R-44862.|Y
01|17008|2|1|Replacement for customer's un-repairable holder sent in|Y
01|17008|2|2|on RGA# R-44862.|Y
01|17023|3|1|This item at no charge as a courtesy to the customer|Y
01|17024|2|1|12 pcs in 1-2 weeks balance in 2.5-3 wks|Y
01|17029|1|1|Repair of customer's 1x CNCZ401 s/n: 6139|Y
01|17029|1|2|Reference RGA# T-44917|Y
01|17029|16|1|M10X40 Bolt|Y
01|17030|1|1|This item is listed at your NET cost|Y
01|17030|2|1|This item is listed at your NET cost|Y
01|17039|4|1|Giveaway|Y
01|17039|5|1|Giveaway|Y
01|17039|6|1|Giveaway|Y
01|17061|2|1|*Non-returnable/ W2 condition|Y
01|17084|1|1|Tooling Certificate Number: E13100-470-062714|Y
01|17085|6|1|*non-returnable|Y
01|17085|7|1|*used for BT30-C20-75 and BT30-C22-75|Y
01|17085|23|1|Non-returnable/Non-cancellable|Y
01|17109|1|1|Howa Part Number: H01MA12A8|Y
01|17109|1|2|Pricing is quoted as a NET per Bob Berongi.|Y
01|17109|2|1|Special Drawbar for Okuma LB3000EX-II/500-BB|Y
01|17109|2|2|To fit H01MA12A8.|Y
01|17109|2|3|Pricing is quoted as a NET per Bob Berongi.|Y
01|17113|1|1|Repair of customer's 2x MNL12-ER32Z-MS s/n: A1839&A1340|Y
01|17113|1|2|Reference RGA# R-44929|Y
01|17113|2|1|Repair quotation for 1x MNL12-ER32Z-MS s/n: A1839|Y
01|17113|2|2|Bearings seals o-rings and collet nuts must be|Y
01|17113|2|3|replaced.  Plus labor charges.|Y
01|17113|3|1|Repair quotation for 1x MNL12-ER32Z-MS s/n: A1840|Y
01|17113|3|2|Bearings seals o-rings and collet nuts must be|Y
01|17113|3|3|replaced.  Plus labor charges.|Y
01|17118|1|1|BRS-6.0-150|Y
01|17118|2|1|BRS-6.0-200|Y
01|17146|3|1|This is listed at your NET cost|Y
01|17146|4|1|This is listed at your NET cost|Y
01|17166|1|1|BFJ4-X130|Y
01|17166|1|2|665.00$|Y
01|17166|2|1|B4C4-0032|Y
01|17166|2|2|$206.00|Y
01|17166|3|1|B4C4-0020|Y
01|17166|3|2|$198.00|Y
01|17166|4|1|B4C5-0020|Y
01|17166|4|2|$217.00|Y
01|17166|5|1|B4C4-0011|Y
01|17166|5|2|$203.00|Y
01|17166|6|1|PART OF ER-03ST|Y
01|17166|6|2|SET COSTS 87$|Y
01|17166|7|1|PART OF ER-03ST|Y
01|17166|7|2|SET COSTS 87$|Y
01|17166|8|1|PART OF ER11-03ST|Y
01|17166|8|2|SET COSTS 87$|Y
01|17166|9|1|ER11-13ST|Y
01|17166|9|2|$383|Y
01|17166|10|1|PART OF ER11-13ST SET|Y
01|17166|10|2|SET COSTS 383$|Y
01|17166|11|1|ER20-15ST|Y
01|17166|11|2|$405.00|Y
01|17166|12|1|ER20-12ST|Y
01|17166|12|2|$329.00|Y
01|17166|13|1|ER13-18ST|Y
01|17166|13|2|$552.00|Y
01|17166|14|1|XGSN-0011|Y
01|17166|14|2|$50.00|Y
01|17166|15|1|XCNA-BB20|Y
01|17166|15|2|$40.00|Y
01|17166|16|1|XCNA-BB32|Y
01|17166|16|2|$88.00|Y
01|17166|17|1|XCCW-D011|Y
01|17166|17|2|$26.00|Y
01|17166|18|1|XCCW-D020|Y
01|17166|18|2|$23.00|Y
01|17166|19|1|XCCW-D032|Y
01|17166|19|2|$34.00|Y
01|17166|20|1|RB40-0001-C|Y
01|17166|21|1|XRKW-0750|Y
01|17166|21|2|$53.00|Y
01|17166|22|1|XFGF-00B4|Y
01|17166|22|2|$210.00|Y
01|17166|23|1|XHDF-0004|Y
01|17166|23|2|$100.00|Y
01|17166|24|1|XCRT-CR11|Y
01|17166|24|2|$50.00|Y
01|17166|25|1|XCRT-CR20|Y
01|17166|25|2|$55.00|Y
01|17166|26|1|XCRT-CR32|Y
01|17166|26|2|$55.00|Y
01|17166|27|1|C4J4-X100|Y
01|17166|27|2|$728.00|Y
01|17166|27|3|We dont offer the same size - but this is the closest|Y
01|17166|28|1|C4C3-0032|Y
01|17166|28|2|$198.00|Y
01|17166|30|1|C4C4-0032|Y
01|17166|30|2|$198.00|Y
01|17166|31|1|C4C4-0020|Y
01|17166|31|2|$192.00|Y
01|17166|32|1|C4C5-0020|Y
01|17166|32|2|$212.00|Y
01|17166|33|1|C4C4-0011|Y
01|17166|33|2|$194.00|Y
01|17184|1|1|PO:6465286|Y
01|17185|3|1|Gage length of 3.13|Y
01|17199|1|1|Tooling Certificate Number: 7585-MCQU-083033-AR14320|Y
01|17208|1|1|Repair of customer's 1x CAT50-UMT200UH.|Y
01|17208|1|2|Reference RGA# R-44823|Y
01|17208|5|1|This part is to quote the broken unit sent in with|Y
01|17208|5|2|CAT50-UMT200UH on RGA# R-44823.|Y
01|17243|1|1|Special BRS-16.0-200|Y
01|17245|1|1|Qt#1545-2014M|Y
01|17247|2|1|DIN Plug Modify C4006-40DIN to C4006-40|Y
01|17247|2|2|No Extra Charge|Y
01|17247|2|3|This is a non-cancelable & non-returnable item|Y
01|17302|11|1|Balance in 1-2 weeks|Y
01|17302|12|1|Balance in 1-2 weeks|Y
01|17383|12|1|Can hold a 1/8 Drill|Y
01|17390|8|1|PIN JIS 10x45L|Y
01|17390|16|1|SC160x190x15|Y
01|17391|20|1|This item is listed at your NET cost.|Y
01|17395|12|1|Can hold a 1/8 Drill|Y
01|17410|20|1|H80F-SF0312-3.25B|Y
01|17410|21|1|HSK80F-ER32-4.84P|Y
01|17410|22|1|HSK80F-ER20-4.84P|Y
01|17410|23|1|TCL-80GH|Y
01|17423|10|1|Promotion- Summer|Y
01|17427|1|1|For End User Composites Horizons Inc|Y
01|17449|2|1|This PB is modified by the E/U|Y
01|17449|3|1|Modification of positioning block by Lyndex-Nikken|Y
01|17449|3|2|is based on AE approval|Y
01|17455|1|1|Widia 1086585 HSK100AER40120M|Y
01|17455|2|1|Widia 1288321 SS250ER20190M|Y
01|17455|3|1|Widia 3863652 HSK100AHPVTT075413|Y
01|17455|4|1|Widia 3863656 HSK100AHPVTT100453|Y
01|17456|1|1|Repair of customer's PF-2.|Y
01|17456|1|2|Reference RGA# R-44983|Y
01|17456|3|1|N Style Batteries.|Y
01|17461|1|1|Repair of customer's CNC401FA s/n: 8077|Y
01|17461|1|2|Reference RGA# T-44980|Y
01|17468|16|1|This item is listed at your net cost $415.00 each|Y
01|17468|19|1|This item is listed at your net cost $300.00 each|Y
01|17481|1|1|Repair of customer's 1x T32106 s/n: A0367.|Y
01|17481|1|2|Reference RGA# R-44940.|Y
01|17481|2|1|The following items must be replaced on 1x T32106B11:|Y
01|17481|2|2|Spindle collet nut bearings seals and o-rings.|Y
01|17481|2|3|Plus Labor charges.|Y
01|17489|1|1|Repair of customer's CNCZ180LSA-BR s/n: 12238|Y
01|17489|1|2|Reference RGA# T-45007|Y
01|17501|1|1|Repair of customer's CNCZ180LSA-BR s/n: 12000|Y
01|17501|1|2|Reference RGA# T-45006|Y
01|17518|1|1|Repair of customer's 1x CNC401TFA s/n: 6682|Y
01|17518|1|2|Reference RGA# T-44935|Y
01|17534|1|1|Repair of customer's 1x TAT-400 s/n: 1514|Y
01|17534|1|2|Reference RGA# T-44936|Y
01|17534|9|1|M6-WASHER|Y
01|17534|10|1|M6X25 Bolts|Y
01|17534|12|1|NPTF1/16 Taper plug screw|Y
01|17534|14|1|TA320RJ004H Spacer Ring|Y
01|17534|15|1|TA320RJ003H Stopper Block|Y
01|17534|16|1|TA326RJ002H Joint Sleeve|Y
01|17542|1|1|Part # 139292 - Cover Plate|Y
01|17542|2|1|Part # 139305 - Locking Sleeve|Y
01|17551|1|1|Repair of customer's 1x CNC250BFA s/n: 3035|Y
01|17551|1|2|Reference RGA# T-44975|Y
01|17573|2|1|This item is listed at your NET cost.|Y
01|17573|2|2|This item is non-cancellable & non-returnable upon|Y
01|17573|2|3|reciept of a firm PO.|Y
01|17581|4|1|NBT50-C12-165|Y
01|17581|7|1|*NTB50-SK10C-200|Y
01|17611|24|1|Gage Length = 4|Y
01|17611|26|1|Gage Length = 3|Y
01|17611|26|2|Only length offered in 200DA range|Y
01|17611|27|1|Used for C40S7-0032|Y
01|17615|3|1|w/ coolant ports|Y
01|17615|5|1|*old-style - will not work with Straight Shank Ext.|Y
01|17624|1|1|*qty break pricing|Y
01|17627|27|1|This item is listed at your NET cost|Y
01|17629|3|1|This is listed at your NET cost|Y
01|17636|1|1|This is a non-cancelable & non-returnable item|Y
01|17636|2|1|This is a non-cancelable & non-returnable item|Y
01|17665|16|1|Bolts to attach the #50-AH-90-SPL bracket to the head.|Y
01|17710|1|1|Tooling Certificate Number: 8112-487-081514|Y
01|17711|3|1|This is a non-cancelable & non-returnable item.|Y
01|17717|4|1|NBT50-C12-165|Y
01|17717|7|1|*NTB50-SK10C-200|Y
01|17745|2|1|Re-assembly of customer's SRI-300 s/n: 2436|Y
01|17745|2|2|Reference RGA# T-44280|Y
01|17760|1|1|Repair of customer's 5AX-2MT-105-120-SA3 s/n: 8086|Y
01|17760|1|2|Reference RGA# T-45021|Y
01|17761|1|1|*no Balanceable holes|Y
01|17770|1|1|*no Balanceable holes - new style|Y
01|17770|8|1|*no Balanceable holes - new style|Y
01|17770|9|1|*no Balanceable holes - new style|Y
01|17772|1|1|ETA 9-11 Weeks|Y
01|17785|1|1|Repair of customer's 5AX-350FA-RCN2-RJ6 s/n: 3589|Y
01|17785|1|2|Reference RGA# T-44976|Y
01|17785|34|1|309779-01 and 291698-29 wires for scale.|Y
01|17808|1|1|Replacement for un-repairable holder sent in for|Y
01|17808|1|2|evaluation on RGA# R-45032.|Y
01|17812|3|1|SEASON PROMOTION|Y
01|17812|3|2|This item may not be cancelled or returned|Y
01|17812|4|1|This item may not be cancelled or returned|Y
01|17814|1|1|Repair of customer's 1x CAT50-UMT200UH sent in for|Y
01|17814|1|2|evaluation on RGA# R-45031.|Y
01|17817|1|1|Repair of customer's 1x CNC202LFA s/n: 8328|Y
01|17817|1|2|Reference RGA# T-44930|Y
01|17825|1|1|Repair of customer's 1x CNC202LFA s/n: 8326|Y
01|17825|1|2|Reference RGA# T-44931|Y
01|17828|1|1|Repair of customer's 3x CAT40-NPU13-105U sent in on|Y
01|17828|1|2|RGA# R-45005|Y
01|17828|3|1|Repair parts for 1st CAT40-NPU13-105U|Y
01|17828|7|1|Repair parts for 2nd CAT40-NPU13-105U|Y
01|17828|11|1|Repair parts for 3rd CAT40-NPU13-105U|Y
01|17828|16|1|Holders are on back-order.  ETA: 9/18/2014|Y
01|17854|1|1|Tooling Certificate Number: 8112-487-081514|Y
01|17854|4|1|*for stubby ER32 C40S7-0032|Y
01|17865|3|1|L = 7.40|Y
01|17865|4|1|L = 4.90|Y
01|17865|5|1|L = 7.17|Y
01|17865|6|1|L = 4.67|Y
01|17871|1|1|Repair of customer's PF-2|Y
01|17871|1|2|Reference RGA# R-45086|Y
01|17871|3|1|N Style Batteries|Y
01|17871|4|1|Unit must be re-calibrated.|Y
01|17892|1|1|Without Makino Pins|Y
01|17904|8|1|*giveaway|Y
01|17904|10|1|*giveaway|Y
01|17904|18|1|w/ 2 gage length|Y
01|17904|19|1|w/ 4 gage length|Y
01|17906|1|1|This item is listed at your NET cost.|Y
01|17910|13|1|Motor Cover|Y
01|17910|16|1|External Cable Set|Y
01|17958|2|1|Jet Slots|Y
01|17958|2|2|Net Price Only|Y
01|17958|2|3|Non-cancelable & non-returnable|Y
01|17958|4|1|Jet Slots|Y
01|17958|4|2|Net Price Only|Y
01|17958|4|3|Non-cancelable & non-returnable|Y
01|17958|6|1|Jet Slots|Y
01|17958|6|2|Net Price Only|Y
01|17958|6|3|Non-cancelable & non-returnable|Y
01|17958|6|4|The customer needs to approve DWG.|Y
01|17975|1|1|Holder includes chip hole only per Nikken drawing|Y
01|17975|1|2|MCA25-26063/1. Once a purchase order is placed it|Y
01|17975|1|3|cannot be cancelled or returned.|Y
01|17988|2|1|Haimer part# A40.025.25|Y
01|17988|3|1|Haimer part# 81.250.12|Y
01|17988|4|1|Haimer part# A40.025.32|Y
01|17988|5|1|Haimer part# 81.320.20|Y
01|17988|6|1|Haimer part# 81.250.04|Y
01|17988|7|1|Balluff BIS0011 Data Chip Installation|Y
01|17991|1|1|Net Price Only|Y
01|17991|1|2|Minimum Order Qty (2p)|Y
01|17991|1|3|Non-Cancelable & Non-Returnable|Y
01|17991|2|1|Net Price Only|Y
01|17991|2|2|Minimum Order Qty (2p)|Y
01|17991|2|3|Non-Cancelable & Non-Returnable|Y
01|17992|4|1|NBT50-C12-165|Y
01|17992|7|1|*NTB50-SK10C-200|Y
01|18000|4|1|Wrench for CAT40-C1-105U|Y
01|18000|5|1|Wrench for Cat40-C3/4-70U|Y
01|18012|2|1|This item is listed at your NET cost.|Y
01|18012|3|1|This item is listed at your NET cost.|Y
01|18028|9|1|C4027-0011-6.00DIN|Y
01|18028|42|1|C4011-1000-4.00DIN-M|Y
01|18028|46|1|C4011-0750-4.00DIN-M|Y
01|18041|1|1|Inspection fee for RGA# T-44671 & T-44938.|Y
01|18041|1|2|Inspection fee was negotiated at $150.00 for RGA#|Y
01|18041|1|3|T-44671 as a one-time courtesy we will honor this|Y
01|18041|1|4|$150.00 Inspection fee for both tables.|Y
01|18041|2|1|Freight Charges for RGA# T-44671.|Y
01|18041|2|2|Per Sergio Lopez this freight charge is to be added|Y
01|18041|2|3|to quotation for RGA# T-44938.  Freight was billed|Y
01|18041|2|4|to Lyndex-Nikken for shipping the NST-300HP from|Y
01|18041|2|5|Flowserve Benicia CA to Lyndex-Nikken.  Customer is|Y
01|18041|2|6|responisble for all freight charges.|Y
01|18060|1|1|Net Price Only|Y
01|18060|1|2|Non-Cancelable & Non-Returnable|Y
01|18060|2|1|Net Price Only|Y
01|18060|2|2|Non-Cancelable & Non-Returnable|Y
01|18069|1|1|Repair of customer's CNC200LFA s/n: 3099|Y
01|18069|1|2|Reference RGA# T-45091|Y
01|18091|1|1|Repair of customer's C40RAM-ER25-215ST s/n: 1770 01|Y
01|18091|1|2|Reference RGA# R-44826|Y
01|18091|2|1|CAT40 main shaft must be replaced.|Y
01|18091|2|2|Bearings seals and o-rings must be replaced.|Y
01|18091|2|3|Plus labor charges. Delivery will be 8-10 weeks.|Y
01|18091|3|1|Housing and existing parts reconditioned.|Y
01|18091|3|2|Preparation assembling inspection and tests.|Y
01|18106|1|1|Discount reflects core trade-in.|Y
01|18127|1|1|Net Price Only|Y
01|18127|1|2|Non-Cancelable & Non-Returnable|Y
01|18128|11|1|T10100|Y
01|18128|12|1|T00198|Y
01|18134|1|1|Repair of customer's 2x CAT40-UMT200UW|Y
01|18134|1|2|Reference RGA# R-45061|Y
01|18134|2|1|Repair parts for first CAT40-UMT200UW are listed below|Y
01|18134|5|1|9V Battery|Y
01|18134|6|1|Labor charges for first unit.|Y
01|18134|7|1|Repair parts for second CAT40-UMT200UW are listed below|Y
01|18134|9|1|9V Battery|Y
01|18134|10|1|Phillips screw M3X.50 5L|Y
01|18134|11|1|Labor charges for second unit.|Y
01|18142|1|1|Pin Lock Screw for Momimen #SC1645C|Y
01|18149|1|1|Tooling Certificate Number:  13170-490-082214|Y
01|18156|1|1|Repair of customer's CAT40-C1.1/4SL-105U|Y
01|18156|1|2|and CAT40-CT1.1/4A-105|Y
01|18156|1|3|Reference RGA# R-45080|Y
01|18156|2|1|Repairs parts for CAT40-C1.1/4SL-105U|Y
01|18156|4|1|Labor charges for CAT40-C1.1/4SL-105U.|Y
01|18156|5|1|CAT40-CT1.1/4A-105 was manufactured by NT Tool.  We can|Y
01|18156|5|2|not repair this unit; however we can dis-assemble|Y
01|18156|5|3|clean up regrease and re-assemble this unit.|Y
01|18164|1|1|This item is listed at your NET cost|Y
01|18164|2|1|This item is listed at your NET cost|Y
01|18164|3|1|This item is listed at your NET cost|Y
01|18164|5|1|This item is listed at your NET cost|Y
01|18164|6|1|This item is listed at your NET cost|Y
01|18164|12|1|This item is listed at your NET cost|Y
01|18164|13|1|This item is listed at your NET cost|Y
01|18166|1|1|Repair of customer's CAT40-ZL12-130U|Y
01|18166|1|2|Reference RGA# R-45068|Y
01|18166|2|1|#24 - 3/16 Ball bearing (set of 3pcs)|Y
01|18183|1|1|Repair of customer's 5AX-400FA s/n: 1034|Y
01|18183|1|2|Reference RGA# T-44899|Y
01|18192|2|1|The above positiong block reflects a net charge of a|Y
01|18192|2|2|finished block done in house @ Lyndex-Nikken.|Y
01|18207|1|1|Net Price Only|Y
01|18207|1|2|Non-Cancelable & Non-Returnable|Y
01|18207|2|1|Net Price Only|Y
01|18207|2|2|Non-Cancelable & Non-Returnable|Y
01|18207|3|1|Net Price Only|Y
01|18207|3|2|Non-Cancelable & Non-Returnable|Y
01|18207|4|1|Net Price Only|Y
01|18207|4|2|Non-Cancelable & Non-Returnable|Y
01|18221|1|1|crossed from PS-585X60|Y
01|18221|2|1|crossed from PSC-585X60|Y
01|18241|2|1|Balluff BIS0011 Data Chip Installation|Y
01|18267|1|1|TOOLING CERTIFICATE NUMBER: 20878-504-092414|Y
01|18276|13|1|*give away|Y
01|18285|2|1|This is listed at your NET cost.|Y
01|18307|1|1|Repair of customer's 2x HP-4|Y
01|18307|1|2|Reference RGA# R-45069|Y
01|18307|2|1|Repair parts for first HP-4 are listed below.|Y
01|18307|4|1|LR44 cell batteries|Y
01|18307|6|1|Labor charges for first HP-4|Y
01|18307|7|1|Repair parts for second HP-4 are listed below.|Y
01|18307|10|1|LR44 cell batteries|Y
01|18307|12|1|Labor charges for the second HP-4.|Y
01|18313|1|1|For Pratt & Whittney|N
01|18328|1|1|CAT40-ZL12-130U|Y
01|18331|1|1|Repair of customer's 5AX-201SA-BR s/n: 1165|Y
01|18331|1|2|Reference RGA# T-45087|Y
01|18354|1|1|Start2 Shrink Fit Package- 10 holders and the Shrink|Y
01|18354|1|2|Fit Unit-induction rings cooling rings Heater and|Y
01|18354|1|3|cooling tower. ( 10 standard tool holder sizes-|Y
01|18354|1|4|to be determined by the customer at a later date )|Y
01|18367|1|1|Repair of customer's TCE-95947-3000R & TCE-95951-3000R|Y
01|18367|1|2|sent in on RGA# T-44903.|Y
01|18367|2|1|Parts to repair 1x TCE-95947-3000R & TCE-95951-3000R|Y
01|18367|2|2|cable sets.|Y
01|18382|4|1|*to be machined by Lyndex-Nikken|Y
01|18382|5|1|*to be machined by E/U|Y
01|18399|1|1|NBT30-C25-80FS|Y
01|18399|1|2|Taper Plus BT30 25mm Milling Chuck 80mm gage length|Y
01|18399|1|3|Face Seal Type|Y
01|18417|1|1|Net Price Only|Y
01|18417|1|2|Non-Cancelable & Non-Returnable|Y
01|18440|1|1|NCAT40-SF0500-3.15 Taper Plus Shrink Fit 1/2 X 3.15|Y
01|18440|2|1|NCAT40-SF0625-3.15 Taper Plus Shrink Fit 5/8 X 3.15|Y
01|18440|3|1|NCAT40-SF0750-3.15 Taper Plus Shrink Fit 3/4 X 3.15|Y
01|18446|1|1|Repair of Customer's TCD-37103/0|Y
01|18446|1|2|Reference RGA# T-44945|Y
01|18494|3|1|Above charge is additional if you need finished block|Y
01|18494|3|2|Price on modification reflects net charge|Y
01|18505|2|1|BT30-BHSH20-79|Y
01|18505|2|2|Net Price Only|Y
01|18505|2|3|Non-Cancelable & Non-Returnable|Y
01|18506|1|1|BT50-BT30 Reducer for TP300 presetter|Y
01|18506|2|1|G30 - Test bar w/pull stud: BIG P30T-1MG for TP300|Y
01|18506|2|2|presetter|Y
01|18512|32|1|Balanceable version in stock for same price|Y
01|18512|36|1|Non-balanceable version is not a standard item|Y
01|18514|1|1|Repair of customer's SF-START2-UNIT-200 s/n: 2J 073|Y
01|18514|1|2|Reference RGA# R-45123|Y
01|18521|1|1|Net Price Only|Y
01|18521|1|2|No Additional Comission|Y
01|18522|1|1|Repair of customer's MZQT47-ER25Z-MS s/n: 34448 01|Y
01|18522|1|2|Reference RGA# R-45120|Y
01|18522|2|1|Spindle needs to be resurfaced.|Y
01|18522|2|2|Bearings seals and o-rings must be replaced.|Y
01|18529|1|1|Net Price Only|Y
01|18529|1|2|Non-Cancelable & Non-Returnable|Y
01|18540|1|1|Normal discount without trade-in.|Y
01|18540|2|1|Discount reflects Core Trade-in of customer's|Y
01|18540|2|2|MZQT47-ER25Z-MS sent in on RGA# R-45120.|Y
01|18558|1|1|Repair of customer's 1x D1.1/2-NPU13|Y
01|18558|1|2|Reference RGA# R-45114|Y
01|18608|4|1|Balance in 8-10 weeks|Y
01|18608|8|1|Balance ETA 10/8|Y
01|18615|1|1|4.12 gage length|Y
01|18615|2|1|6 gage length|Y
01|18615|4|1|2.5 gage length|Y
01|18615|5|1|4 gage length|Y
01|18615|7|1|2.5 gage length|Y
01|18615|8|1|4 gage length|Y
01|18615|10|1|3.5 gage length|Y
01|18615|12|1|1.75 gage length|Y
01|18615|13|1|4 gage length|Y
01|18615|14|1|3 gage length|Y
01|18615|15|1|7 gage length|Y
01|18615|16|1|9 gage length|Y
01|18656|1|1|Net Price Only|Y
01|18656|1|2|Non-Cancelable & Non-Returnable|Y
01|18656|2|1|Net Price Only|Y
01|18656|2|2|Non-Cancelable & Non-Returnable|Y
01|18656|3|1|Net Price Only|Y
01|18656|3|2|Non-Cancelable & Non-Returnable|Y
01|18656|4|1|Net Price Only|Y
01|18656|4|2|Non-Cancelable & Non-Returnable|Y
01|18672|1|1|Balance in 7 weeks|Y
01|18672|2|1|Balance in 3 weeks|Y
01|18675|1|1|Repair of customer's 2x PF-2|Y
01|18675|1|2|Reference RGA# R-45127|Y
01|18675|2|1|Repair parts below for first PF-2|Y
01|18675|5|1|First unit must be re-calibrated.|Y
01|18675|6|1|Second PF-2 all parts are in Good condition.|Y
01|18675|6|2|Units must be re-calibrated.|Y
01|18675|7|1|Second PF-2 must be re-calibrated.|Y
01|18678|1|1|Repair of customer's 1x S1005-0562.|Y
01|18678|1|2|Reference RGA# R-45156|Y
01|18686|1|1|Repair of customer's CNC200L s/n: 3876|Y
01|18686|1|2|Reference RGA# T-42538|Y
01|18686|19|1|RON886 Scale for CNC200L|Y
01|18686|20|1|Scale Mounting Kit|Y
01|18686|21|1|Labor charges for installing Scale kit onto CNC200L|Y
01|18686|22|1|Charge is for painting the body of customer's CNC200L.|Y
01|18686|22|2|Optional.|Y
01|18686|23|1|Motor Cover for CNC200L|Y
01|18686|24|1|Motor gear for Siemens Motor part number of gear will|Y
01|18686|24|2|be known once we receive motor.|Y
01|18686|24|3|Cost of the gear can be up to $400.00.|Y
01|18686|25|1|Siemens servo motor 1FT5064-OAC71-1-Z H04|Y
01|18708|1|1|Repair of customer's MZQT47-ER32X-OFF s/n: 39259 01|Y
01|18708|1|2|Reference RGA# R-45147|Y
01|18708|2|1|Resurface spindle as needed.|Y
01|18708|2|2|Replace all bearings seals and o-rings. Plus labor.|Y
01|18716|1|1|200-240V or 380-480 Choice of Power Supply|Y
01|18727|1|1|Repair of customer's 5AX-130FA s/n: 3116|Y
01|18727|1|2|Reference RGA# T-45071|Y
01|18739|1|1|*includes PA65-HSK|Y
01|18741|16|1|All ER32 standard collets are priced the same|Y
01|18741|20|1|This item at no charge as a courtesy|Y
01|18745|1|1|CKFN20-1/2: 20mm Milling Chuck series 1/2 jet-slotted|Y
01|18745|1|2|coolant nut|Y
01|18760|3|1|If retention knobs are purchased with tooling we will|Y
01|18760|3|2|honor the net price.|Y
01|18787|1|1|Pricing reflects the Core-Replacement Discount.|Y
01|18815|3|1|Note the above holder will be a complete special once|Y
01|18815|3|2|the 1 pc is sold. Price & Delivery will need to be|Y
01|18815|3|3|re-quoted on the balance of 4 pcs.|Y
01|18815|10|1|Note above holder needs to be quoted as special|Y
01|18847|1|1|This item is listed at your NET cost.|Y
01|18860|2|1|This item is listed at your NET cost|Y
01|18865|1|1|CAT40 Universal Micro Touch w/ 6mm Ball Stylus|Y
01|18871|2|1|Balluff BIS0011 Data Chip Installation|Y
01|18876|1|1|Repair of customer's CNC321 s/n: 9627|Y
01|18876|1|2|Reference RGA# T-45116|Y
01|18884|1|1|Repair of customer's 5AX-130FA s/n: 3749|Y
01|18884|1|2|Reference RGA# T-45152|Y
01|18892|1|1|Net Price Only|Y
01|18892|1|2|Non-Cancelable & Non-Returnable|Y
01|18892|1|3|(4p) in stock at L/N|Y
01|18913|7|1|Note since there is no stock on the above holder|Y
01|18913|7|2|possibly you might be interested in a longer gage|Y
01|18913|7|3|NBT30-SK6C-120P = Stock $419.00 - 15%|Y
01|18915|1|1|Repair of customer's MNL12-ER32Z-MS s/n: A0668|Y
01|18915|1|2|Reference RGA# R-45066|Y
01|18915|2|1|Collet nuts must be replaced.|Y
01|18915|2|2|Bearings seals and o-rings must be replaced.|Y
01|18915|2|3|Plus Labor charges.|Y
01|18923|7|1|Standard|Y
01|18923|8|1|Coolant Through|Y
01|18931|1|1|This is listed at your NET cost|Y
01|18937|2|1|Balance in 2-3 weeks|Y
01|18942|1|1|Net Price Each|Y
01|18942|1|2|Non-Cancelable & Non-Returnable|Y
01|18942|2|1|Net Price Each|Y
01|18942|2|2|Non-Cancelable & Non-Returnable|Y
01|18960|16|1|Mimatic Part No. 127421|Y
01|18960|17|1|Mimatic Part No. 112369|Y
01|18967|3|1|NC5006-2000-4.746|Y
01|18967|3|2|Non-Cancelable & Non-Returnable|Y
01|18967|3|3|Please allow additional time for the approval DWG|Y
01|18996|1|1|Repair of customer's 5AX-2202FA s/n: 1224|Y
01|18996|1|2|Reference RGA# T-45153|Y
01|19009|1|1|3.5 Gage Length|Y
01|19009|2|1|6 Gage Length|Y
01|19009|3|1|9 Gage Length|Y
01|19009|4|1|4 Gage Length|Y
01|19009|5|1|6 Gage Length|Y
01|19009|6|1|3.13 Gage Length|Y
01|19009|7|1|5 Gage Length|Y
01|19009|8|1|9 Gage Length|Y
01|19009|9|1|4 Gage Length|Y
01|19009|10|1|2.5 Gage Length|Y
01|19009|11|1|4 Gage Length|Y
01|19009|12|1|4 Gage Length|Y
01|19009|13|1|9 Gage Length|Y
01|19009|14|1|4 Gage Length|Y
01|19009|15|1|5 Gage Length|Y
01|19009|16|1|4 Gage Length|Y
01|19009|17|1|5 Gage Length|Y
01|19009|18|1|4 Gage Length|Y
01|19009|19|1|5.5 Gage Length|Y
01|19009|20|1|4 Gage Length|Y
01|19009|21|1|5.5 Gage Length|Y
01|19009|22|1|4 Gage Length|Y
01|19009|23|1|6 Gage Length|Y
01|19009|24|1|4 Gage Length|Y
01|19009|25|1|4.5 Gage Length|Y
01|19009|26|1|1.75 Gage Length|Y
01|19009|27|1|4 Gage Length|Y
01|19009|28|1|2 Gage Length|Y
01|19009|29|1|4 Gage Length|Y
01|19017|4|1|*Special: Qt# 2551-2014|Y
01|19017|4|2|Non-returnable/ non-cancellable|Y
01|19017|4|3|*8-10 wks MFG|Y
01|19077|13|1|Balance in 8 weeks|Y
01|19091|7|1|2 Flat Positioning Block|Y
01|19091|7|2|To be modified by Customer|Y
01|19097|1|1|Gage Length: 2.36|Y
01|19097|5|1|Gage Length = 2.50|Y
01|19101|3|1|9TLU-CN401R Set of CNC401 Face plate spindle|Y
01|19101|3|2|Inner Race and Worm Wheel (WW-AX401R014)|Y
01|19102|1|1|BO 10p ETA 10-10-2014|Y
01|19102|1|2|BO 10p ETA Early Nov|Y
01|19146|1|1|Repair of customer's OKL3-ER32Z-OFMS s/n: AL177|Y
01|19146|1|2|Reference RGA# R-45173|Y
01|19146|2|1|Collet nuts need to be replaced.|Y
01|19146|2|2|Bearings seals and o-rings must be replaced.|Y
01|19147|1|1|Non-Cancelable & Non-Returnable|Y
01|19175|1|1|Repair of customer's OKEX-ER32Z s/n: AL097|Y
01|19175|1|2|Reference RGA# R-45185|Y
01|19175|2|1|Gears and collet nut must be replaced.|Y
01|19175|2|2|Bearings seals and o-rings must be replaced.|Y
01|19175|2|3|Plus Labor charge.|Y
01|19179|2|1|This item is listed at your NET cost|Y
01|19185|1|1|Repair of customer's 1x MZQT47-ER32X-OFF-C s/n: 3925906|Y
01|19185|1|2|Reference RGA# R-45198|Y
01|19185|2|1|Resurface spindle replace bearings seals and o-rings.|Y
01|19185|2|2|Plus labor charges.|Y
01|19190|1|1|Net Proce Each|Y
01|19190|1|2|Non-Cancelable & Non-Returnable|Y
01|19234|1|1|Repair of customer's CNC250 s/n: n/a|Y
01|19234|1|2|Reference RGA# T-42537|Y
01|19234|13|1|Labor for repair of CNC250|Y
01|19234|14|1|RON886 Scale for CNC250|Y
01|19234|15|1|Scale Mount Kit|Y
01|19234|16|1|Labor for Scale Modification|Y
01|19234|17|1|Charge is for painting the body of customer's|Y
01|19234|17|2|CNC250|Y
01|19234|18|1|Motor Cover for CNC250|Y
01|19234|19|1|Motor gear for Siemens Motor part number of gear will|Y
01|19234|19|2|be known once we receive motor.|Y
01|19234|19|3|Cost of the gear can be up to $400.00.|Y
01|19234|20|1|Siemens servo motor 1FT5064-OAC71-1-Z H04|Y
01|19238|1|1|Repair of customer's 2x BT50-C1.1/4-105|Y
01|19238|1|2|Reference RGA# R-45042|Y
01|19238|2|1|Repair parts for 1st BT50-C1.1/4-105|Y
01|19238|6|1|Repair parts below are for 2nd BT50-C1.1/4-105|Y
01|19241|1|1|Repair of customer's CAT50 Milling Chucks|Y
01|19241|1|2|Reference RGA# R-45203|Y
01|19241|2|1|Repair parts below for 1x CAT50-C3/4-105U|Y
01|19241|4|1|Labor is for 1x CAT50-C3/4-105U|Y
01|19241|5|1|Repair parts below for CAT50-C7/8-90U|Y
01|19241|7|1|Labor for 1x CAT50-C7/8-90U.|Y
01|19241|8|1|1x CAT50-C3/4-105U is un-repairable.  There is too much|Y
01|19241|8|2|damage on the bore nut will not lock.|Y
01|19241|8|3|Please note your normal discount for this item is 25%|Y
01|19241|8|4|I have given an extra 5% discount as a one-time|Y
01|19241|8|5|courtesy so they can replace their un-repairable holder|Y
01|19277|1|1|Repair of customer's 1x C40RAM-ER20-225ST s/n: 7161 01|Y
01|19277|1|2|Reference RGA# R-45168|Y
01|19277|2|1|ER spindle gears and cover are damaged must be|Y
01|19277|2|2|replaced.  All Bearings seals and o-rings must be|Y
01|19277|2|3|replaced.  Plus labor charges.|Y
01|19290|1|1|Net Price Each|Y
01|19290|1|2|Non-Cancelable & Non-Returnable|Y
01|19306|1|1|Repair of customer's 5AX-130OSP s/n: 3063|Y
01|19306|1|2|Reference RGA# T-45111|Y
01|19326|1|1|Repair of customer's T32276 s/n: A0005|Y
01|19326|1|2|L-N Part# MNZ20-ER25Z-MS|Y
01|19326|1|3|Reference RGA# R-45182|Y
01|19326|2|1|Replacement of parts only.|Y
01|19355|1|1|Discount reflects core replacement program customer|Y
01|19355|1|2|has sent in their unit on RGA# R-45215.|Y
01|19388|3|1|TQW-GH20 Torque Wrench|Y
01|19388|4|1|TQW-GH32 Torque Wrench|Y
01|19394|14|1|(10) Tool holders listed above are part of the Lyndex|Y
01|19394|14|2|Nikken Special Shrink Fit Start-Up Package.|Y
01|19404|3|1|TQW-GH20 Torque Wrench|Y
01|19404|4|1|TQW-GH32 Torque Wrench|Y
01|19431|4|1|Net Price|Y
01|19433|12|1|FK-7|Y
01|19441|2|1|Start 2 Shrink Fit Unit Package- 10 Standard Gage|Y
01|19441|2|2|Length holders (TBD)  $11500.00 and the unit|Y
01|19453|3|1|Non-Cancelable & Non-Returnable|Y
01|19457|2|1|NB4016-0625-2.50|Y
01|19457|2|2|Future Part Number NB4006-0625-2.50|Y
01|19457|4|1|Future Part Number NB4006-1000-3.56|Y
01|19457|5|1|Future Part Number NB4006-1250-3.56|Y
01|19457|11|1|Future Part Number NB4007-0025-2.25|Y
01|19457|79|1|Estimated Freight Charges Shipping to Boldt Machinery|Y
01|19465|2|1|Net Price Each|Y
01|19465|2|2|Non-Cancelable & Non-Returnable|Y
01|19480|4|1|Non-Cancelable & Non-Returnable|Y
01|19480|5|1|Non-Cancelable & Non-Returnable|Y
01|19483|1|1|Taper portion of BT40-NPU8-70|Y
01|19483|1|2|Item does not include the drill chuck portion.|Y
01|19483|1|3|Items are not returnable once a PO has been placed.|Y
01|19483|1|4|Delivery: 2-3 working days.|Y
01|19489|1|1|Repair of customer's 1x C40RAM-ER20-225ST s/n: 70252303|Y
01|19489|1|2|Reference RGA# R-45212|Y
01|19489|2|1|Resurface Spindle.|Y
01|19489|2|2|Bearings seals and o-rings must be replaced.|Y
01|19492|2|1|Net Price Each|Y
01|19492|2|2|Non-Cancelable & Non-Returnable|Y
01|19495|11|1|Above price on special relfects NET charge|Y
01|19495|11|2|Above special is Non-Cancelable & Non-Returnable|Y
01|19495|11|3|Delivery for special = 16 weeks|Y
01|19506|1|1|non returnable|Y
01|19519|1|1|Balanced to a G2.5 rating up to 24000rpm|Y
01|19519|2|1|Balanced to a G6.3 rating up to 18000rpm|Y
01|19530|1|1|This is a Bill Only Sales Order- 629617.|Y
01|19530|1|2|Test was Successfull.|Y
01|19550|6|1|Not offered in Coolant Thru|Y
01|19550|7|1|You guys inquired an ER16 which we dont offer. offered|Y
01|19550|7|2|an ER20 B/C it has the same shank and square as the E16|Y
01|19550|8|1|Quoted this to Hold the ER20 Collet|Y
01|19550|9|1|Wrench for the ER20 holder|Y
01|19550|10|1|*NO FLAT ON SHANK*|Y
01|19550|11|1|*NO FLAT ON SHANK*|Y
01|19550|12|1|*NO FLAT ON SHANK*|Y
01|19550|13|1|*NO FLAT ON SHANK*|Y
01|19550|20|1|Not offered in Coolant Thru|Y
01|19568|1|1|The discount below is based on a quantity of 1-3 pcs|Y
01|19568|3|1|The discount below is based on 4 plus pieces|Y
01|19568|5|1|Lyndex-Nikken Special Order Positioning Block|Y
01|19582|4|1|Collapse Range = 6.0-5.0mm|Y
01|19587|1|1|Used Inventory|Y
01|19592|3|1|BT40-TP200|Y
01|19605|9|1|Currently on Vendor Backorder. Delivery Pending|Y
01|19605|10|1|Same dimensions as PS-17 but made by Lyndex.|Y
01|19632|4|1|STANDARD|Y
01|19673|1|1|Repair of customer's 1x CNC202LFA s/n: 8002|Y
01|19673|1|2|Reference RGA# T-44109|Y
01|19673|13|1|CN203L050/6 Gear Box for CNC202LFA with Alpha i8 Motor|Y
01|19681|1|1|Repair of customer's CNC202LFA s/n: 19830T|Y
01|19681|1|2|Reference RGA# T-44110|Y
01|19681|23|1|CN203L050/6 Gear Box for CNC202LFA with Alpha i8 Motor|Y
01|19687|1|1|Repair of customer's CNC250 s/n: 1439|Y
01|19687|1|2|Reference RGA# T-45186|Y
01|19698|1|1|Repair of customer's 5AX-2MT-105-120YA-M|Y
01|19698|1|2|Reference RGA# T-45132|Y
01|19728|1|1|Repair of customer's 5AX-130 s/n: 1840 mfg: 2006|Y
01|19728|1|2|Reference RGA# T-45226|Y
01|19742|1|1|This item is listed at your NET cost|Y
01|19774|1|1|3 Gage Length|Y
01|19774|2|1|4.5 Gage Length|Y
01|19775|1|1|Repair of customer's 1x CNC202LFA s/n: 2680 T|Y
01|19775|1|2|Reference RGA# T-44112|Y
01|19775|5|1|CN203L050/6 Gear Box for CNC202LFA with Alpha i8 Motor|Y
01|19775|24|1|M5x25L Cap Bolt|Y
01|19822|1|1|Repair of customer's 1x PF-2|Y
01|19822|1|2|Reference RGA# R-45202.|Y
01|19832|1|1|Repair of customer's C5005-0562|Y
01|19832|1|2|Reference RGA# R-45210|Y
01|19837|1|1|This item is listed at your NET cost|Y
01|19837|2|1|This item is listed at your NET cost|Y
01|19837|3|1|This item is listed at your NET cost|Y
01|19849|1|1|Repair of customer's CAT50U-NX4-192|Y
01|19849|1|2|Reference RGA# R-45161|Y
01|19854|1|1|Repair of customer's 4x PF-2|Y
01|19854|1|2|Reference RGA# R-45176|Y
01|19854|2|1|Repair Parts below for 1st PF-2|Y
01|19854|7|1|Repair Parts below are for the 2nd PF-2|Y
01|19854|13|1|Repair Parts below are for the 3rd PF-2|Y
01|19854|14|1|N Style Batteries|Y
01|19854|18|1|Repair Parts below are for the 4th PF-2|Y
01|19854|19|1|N Style Batteries|Y
01|19877|1|1|Net Price Each|Y
01|19880|1|1|Repair of customer's BT40-UMT200H & CAT40-UMT200UH|Y
01|19880|1|2|Reference RGA# R-45223|Y
01|19880|2|1|Repair parts below are for BT40-UMT200H|Y
01|19880|5|1|Repair parts below are for the CAT40-UMT200UH|Y
01|19880|7|1|9V Battery must be replaced.|Y
01|19914|1|1|Repair of customer's CNC202LFA s/n: 7709|Y
01|19914|1|2|Reference RGA# T-45285|Y
01|19914|26|1|CN203L050/6 Gear Box for Alpha 8i motor|Y
01|19915|1|1|Net Price Each|Y
01|19915|2|1|Net Price Each|Y
01|19915|3|1|Net Price Each|Y
01|19915|3|2|Non-Cancelable & Non-Returnable|Y
01|19915|4|1|Net Price Each|Y
01|19915|4|2|Non-Cancelable & Non-Returnable|Y
01|19921|1|1|Repair of customer's CNC202LFA s/n: 7643|Y
01|19921|1|2|Reference RGA# T-45286|Y
01|19943|6|1|Takes same wrenches as MZST80-ER40X-C|Y
01|19943|7|1|Takes same wrench as MZST80-MI63X|Y
01|19965|1|1|Non-Cancelable & Non-Returnable|Y
01|20005|1|1|Demo Unit|Y
01|20005|2|1|New Unit|Y
01|20014|1|1|Net Price Each|Y
01|20014|2|1|Net Price Each|Y
01|20044|1|1|Non-Cancelable & Non-Returnable|Y
01|20069|1|1|Balance in 10 weeks|Y
01|20069|2|1|Balance in 10 weeks|Y
01|20083|1|1|Repair of customer's CNC200YA s/n: 2623 Mfg: 90.8|Y
01|20083|1|2|Reference RGA# T-45271|Y
01|20097|1|1|Solenoid Manifold block.|Y
01|20108|1|1|Repair of customer's CNC100-3W-120FA s/n: 8055|Y
01|20108|1|2|Reference RGA# T-45256|Y
01|20108|15|1|Plating and grinding of customer's original spindle x3.|Y
01|20109|1|1|Balance in 10 weeks|Y
01|20109|2|1|Balance in 10 weeks|Y
01|20127|1|1|Repair of customer's CNC321 s/n: n/a|Y
01|20127|1|2|Reference RGA# T-45267|Y
01|20127|14|1|Expedite Fee is for expedited inspection and repair.|Y
01|20139|9|1|Direct Coolant|Y
01|20139|10|1|Direct Coolant Modification Charge|Y
01|20139|11|1|Direct Coolant|Y
01|20139|12|1|Direct Coolant Modification Charge|Y
01|20139|17|1|Direct Coolant|Y
01|20139|18|1|Direct Coolant Modification Charge|Y
01|20139|19|1|Direct Coolant|Y
01|20139|20|1|Direct Coolant Modification Charge|Y
01|20139|27|1|Direct Coolant|Y
01|20139|28|1|Direct Coolant Modification Charge|Y
01|20143|9|1|Direct Coolant|Y
01|20143|10|1|Direct Coolant Modification Charge|Y
01|20143|11|1|Direct Coolant|Y
01|20143|12|1|Direct Coolant Modification Charge|Y
01|20143|17|1|Direct Coolant|Y
01|20143|18|1|Direct Coolant Modification Charge|Y
01|20143|19|1|Direct Coolant|Y
01|20143|20|1|Direct Coolant Modification Charge|Y
01|20143|27|1|Direct Coolant|Y
01|20143|28|1|Direct Coolant Modification Charge|Y
01|20145|16|1|Balance in 10-12 weeks|Y
01|20151|1|1|Shrink Fit Machine w/ 10 standard GL CAT40 SF holders|Y
01|20154|2|1|Modification Charge|Y
01|20154|4|1|Modification Charge|Y
01|20154|7|1|Modification Charge|Y
01|20154|9|1|Modification Charge|Y
01|20202|2|1|Net Price Each|Y
01|20202|2|2|Non-Cancelable & Non-Returnable|Y
01|20230|16|1|Balance in 10-12 weeks|Y
01|20231|1|1|Balance in < 1 week|Y
01|20236|1|1|*This item is listed at your NET cost. This special|Y
01|20236|1|2|Mimatic pricing is applicable for up to 4 pcs*|Y
01|20272|1|1|This item is listed at your NET cost|Y
01|20277|5|1|Gage length = 9|Y
01|20277|6|1|Gage length = 9|Y
01|20277|7|1|Gage length = 5|Y
01|20277|8|1|Gage length = 6''|Y
01|20293|5|1|Non-Cancelable & Non-Returnable|Y
01|20297|1|1|Tooling Certificate Number: 25000-497-090214|Y
01|20304|4|1|RCR-ER32 KIT|Y
01|20306|1|1|4 Projection|Y
01|20306|2|1|4 Projection|Y
01|20306|3|1|4 Projection|Y
01|20306|4|1|3.5 Projection|Y
01|20306|5|1|5.5 Projection|Y
01|20306|17|1|6 Projection|Y
01|20306|18|1|1.75 Projection|Y
01|20306|19|1|4 Projection|Y
01|20306|20|1|4 Projection|Y
01|20306|21|1|2 Projection|Y
01|20306|22|1|4 Projection|Y
01|20306|24|1|Option #1 for holding fixture|Y
01|20306|25|1|Option #2 for holding fixture|Y
01|20307|23|1|Tooling Certificate Discount|Y
01|20316|1|1|This price is applicable for up to 5 pcs|Y
01|20316|4|1|HSK100A  32mm Pro-Endmill Base Holder|Y
01|20316|7|1|HSK100A  32mm Pro-Endmill Base Holder|Y
01|20317|2|1|*3 pots included with machine|Y
01|20386|31|1|Transit: 8hours x $100/hour =$800|Y
01|20386|31|2|Airfare: $1000 (estimated)|Y
01|20386|31|3|Hotel: $110/night x2night = $220|Y
01|20386|31|4|Car Rental: $100/day x3days = $300 (estimated)|Y
01|20408|1|1|Balance in 8 weeks|Y
01|20454|4|1|**Lyndex-Nikken to make|Y
01|20484|1|1|Service call for customer's CNC501|Y
01|20484|2|1|Airfare plus car rental: $700.00|Y
01|20484|2|2|Hotel: $150.00|Y
01|20484|2|3|Mileage .75 per mile: 155 miles = $116.25|Y
01|20484|2|4|Transit time: 10hrs * $50/hr = $500.00|Y
01|20484|3|1|Minimum of 2 hours labor|Y
01|20486|5|1|Above attachment reflects NET charge.|Y
01|20486|7|1|Price and delivery on CHC-5 collet is pending|Y
01|20486|9|1|Estimated labor for Lyndex-Nikken to modify block.|Y
01|20492|1|1|Repair of customer's CNC202LFA s/n: 7488|Y
01|20492|1|2|Reference RGA# T-45278|Y
01|20494|1|1|Repair of customer's CNC202LFA s/n: 8001|Y
01|20494|1|2|Reference RGA# T-45279|Y
01|20596|1|1|This is not a standard stock item and is considered|Y
01|20596|1|2|special. It is non-cancellable & non-returnable upon|Y
01|20596|1|3|reciept of a firm PO.|Y
01|20615|1|1|Non-Cancelable & Non-Returnable|Y
01|20636|1|1|Repair of customer's MNL12-ER32Z s/n: A3392|Y
01|20636|1|2|Reference RGA# R-45298|Y
01|20636|2|1|Gears and collet nut must be replaced.|Y
01|20636|2|2|Bearings seals and O-rings must also be replaced.|Y
01|20636|2|3|Plus labor charges.|Y
01|20645|1|1|Repair of customer T32106 s/n: n/a|Y
01|20645|1|2|Reference RGA# R-45320|Y
01|20645|2|1|Spindle and gears must be replaced.|Y
01|20645|2|2|Bearings seals and o-rings must be replaced.|Y
01|20645|2|3|Plus labor charges.|Y
01|20652|1|1|Customer sent in 1x CAT40-C1.1/4-85U for evaluation.|Y
01|20652|1|2|This unit has been deemed un-repairable.|Y
01|20652|1|3|Reference RGA# R-45296.|Y
01|20659|4|1|HSK63A-HC0750-100 Hydraulic Holder 3/4 X 100 Gage Lg|Y
01|20659|5|1|HSK63A-HC1000-120 Hydraulic Holder 1.0 x 120 Gage Lg|Y
01|20661|1|1|Repair of customer's 1x CAT40-C3/4-85U|Y
01|20661|1|2|Reference RGA# R-45244|Y
01|20661|3|1|Remove excess grease replace snap ring clean up bore|Y
01|20661|3|2|and cleaned up taper.|Y
01|20663|1|1|Stop Block to be quoted at the time of RAH application|Y
01|20663|1|2|Qualification.|Y
01|20666|1|1|Discount reflects core replacement/trade in:RGA R-45298|Y
01|20673|1|1|Repair of customer's FP-2|Y
01|20673|1|2|Reference RGA# R-45265|Y
01|20673|3|1|CR2032 Battery|Y
01|20680|1|1|Repair of customer's C40RA-0025|Y
01|20680|1|2|Reference RGA# R-45235|Y
01|20692|2|1|Delivery:(4)4-5wks (20) 3.5~4mth|Y
01|20692|2|2|These items are not standard stock and are considered|Y
01|20692|2|3|special. Once a purchase order is placed they may not|Y
01|20692|2|4|be cancelled or returned.|Y
01|20692|2|5|Lyndex-Nikken quote 4686-NIK14|Y
01|20692|2|6|Holders quoted with chip hole only.|Y
01|20692|9|1|Lyndex-Nikken Quotation 4686-NIK14|Y
01|20692|9|2|These items are not standard stock and are considered|Y
01|20692|9|3|special.  Once a purchase order is placed these items|Y
01|20692|9|4|may not be cancelled or returned.|Y
01|20692|9|5|Delivery 6 Weeks|Y
01|20692|9|6|Holders quoted with chip hole only|Y
01|20716|1|1|for Mori Seiki MH50|Y
01|20716|2|1|for Mori Seiki MH50|Y
01|20744|1|1|Repair of customer's 2x MCAT50-C1.1/4-90U|Y
01|20744|1|2|Reference RGA# R-45314|Y
01|20744|2|1|Units require 3-Lock Maintenance|Y
01|20748|1|1|15 pcs in 1-2 weeks. Anything above this qty in 12 wks|Y
01|20748|4|1|12 pcs in 1-2 weeks. Anything above this qty in 12 wks|Y
01|20758|1|1|Non-Cancelable & Non-Returnable|Y
01|20762|1|1|Repair of customer's CNC200FA s/n: 9538|Y
01|20762|1|2|Reference RGA# T-45335|Y
01|20766|1|1|Net price only.|Y
01|20775|1|1|Repair of customer's 1x CAT40-UMT200UH|Y
01|20775|1|2|Reference RGA# R-45337|Y
01|20775|3|1|Unit must be re-calibrated.|Y
01|20806|1|1|Note that this item is listed at your NET cost.|Y
01|20823|1|1|Repair of customer's 1x 5AX-130 s/n: 1251|Y
01|20823|1|2|Reference RGA# T-45307|Y
01|20823|7|1|M5X25 Bolts|Y
01|20827|7|1|Non-Cancelable & Non-Returnable|Y
01|20827|8|1|Non-Cancelable & Non-Returnable|Y
01|20834|1|1|PROMO IMTS|Y
01|20877|1|1|*non-coolant|Y
01|20877|2|1|*non-coolant|Y
01|20881|15|1|Balance in 1-2 weeks|Y
01|20881|16|1|Balance in 1-2 weeks|Y
01|20881|17|1|Balance in 1-2 weeks|Y
01|20882|2|1|This item is listed at your NET cost|Y
01|20911|15|1|Wrecnch for the Straight Shank. Takes special Nut|Y
01|20930|1|1|Repair of customer's PF-2|Y
01|20930|1|2|Reference RGA# R-45363|Y
01|20964|8|1|This item is listed at your NET cost|Y
01|20964|9|1|This item is listed at your NET cost|Y
01|20964|10|1|This item is listed at your NET cost|Y
01|20968|1|1|4.72 GL|Y
01|20968|2|1|3.56 GL|Y
01|20968|3|1|4.72 GL|Y
01|20968|4|1|3.56 GL|Y
01|20968|5|1|4.72 GL|Y
01|20968|6|1|2.5 GL|Y
01|20971|1|1|Repair of customer's OKLB15M-ER32X s/n: A0286|Y
01|20971|1|2|Reference RGA# R-45339|Y
01|20971|2|1|Spindle gears clutch and collet nut must be replaced.|Y
01|20971|2|2|Bearings seals and o-rings must be replaced.|Y
01|20974|1|1|10-pieces per pack.|Y
01|20986|1|1|2.25 Projection|Y
01|20997|7|1|BT40-SK25-75P|Y
01|21000|15|1|Balance in 1-2 weeks|Y
01|21000|16|1|Balance in 1-2 weeks|Y
01|21000|17|1|Balance in 1-2 weeks|Y
01|21003|1|1|Main Body for CAT50U-SLO1.1/4-150|Y
01|21003|1|2|Quoted as NET Pricing.|Y
01|21003|1|3|Delivery is 4 weeks from the receipt of a purchase|Y
01|21003|1|4|order.  This item is not a standard stock item and is|Y
01|21003|1|5|considered a special.  Once a purchase order is|Y
01|21003|1|6|placed this item cannot be cancelled or returned.|Y
01|21010|1|1|This item is listed at your NET cost|Y
01|21022|2|1|*old style - will not accept straight shank ext|Y
01|21022|4|1|*old style - will not accept straight shank ext|Y
01|21025|1|1|Net Price Each|Y
01|21059|1|1|Repair of customer's 5AX-120 s/n: 8313F mfg: 01-10|Y
01|21059|1|2|Reference RGA# T-45326|Y
01|21059|2|1|Wire harness for both rotary and tilt sides.|Y
01|21059|2|2|These have to be made by the Installation Technician|Y
01|21059|2|3|5 week delivery.|Y
01|21067|2|1|Setting Fixture for OKL3-ER32Z|Y
01|21067|3|1|Spanner Wrench for all three tools|Y
01|21067|5|1|Setting Fixture for OKL3-ER32X|Y
01|21067|7|1|Setting Fixture for OKL3-ER32Z-OFM|Y
01|21072|2|1|Amplifier & all other cables for interconnection|Y
01|21072|2|2|with machine|Y
01|21072|2|3|Amplifier & other cables include items listed below|Y
01|21082|1|1|3 Gage Length|Y
01|21082|2|1|5 Gage Length|Y
01|21110|1|1|Discount is a one-time courtesy per Craig Schepers.|Y
01|21116|1|1|Same as Alps OKU-L470-Z|Y
01|21135|1|1|Repair of customer's 1x BT50-MOC1.1/4-170|Y
01|21135|1|2|Reference RGA# R-45261|Y
01|21135|2|1|Spindle Shaft has grooves typically this is considered|Y
01|21135|2|2|un-repairable.  However we can try to re-plate and|Y
01|21135|2|3|grind.  We cannot guarantee that this will work.|Y
01|21141|1|1|4.528 Gage Length|Y
01|21141|2|1|5.315 Gage Length|Y
01|21141|3|1|Wrench for the 1 Milling Chucks|Y
01|21141|4|1|4.528 Gage length|Y
01|21141|5|1|Wrench for 1.1/4 milling chuck|Y
01|21141|6|1|4.528 Gage length|Y
01|21141|7|1|Wrench for 3/4 milling chuck|Y
01|21141|9|1|Wrench for ER25|Y
01|21144|1|1|Repair of customer's 2x PF-2|Y
01|21144|1|2|Reference RGA# R-45350|Y
01|21144|2|1|Repair parts below are for PF-2 #1|Y
01|21144|4|1|PF-2 #1 must be recalibrated.|Y
01|21144|5|1|Repair parts below are for PF-2 #2|Y
01|21144|7|1|PF-2 #2 must be re-calibrated.|Y
01|21170|1|1|This item is listed at your NET cost|Y
01|21208|1|1|This item is listed at your NET cost|Y
01|21210|2|1|All parts in stock besides KM32-26. This is 1-2 weeks|Y
01|21210|2|2|out.|Y
01|21235|1|1|Repair of customer's 1x CNCH202LFA-M s/n: 8006|Y
01|21235|1|2|Reference RGA# T-45394|Y
01|21235|3|1|Special WW-CN180R003A for Baker Hughes CNCH200LFA-M|Y
01|21235|3|2|Final part number and delivery are pending.|Y
01|21238|2|1|3 more pcs in 3 weeks|Y
01|21298|1|1|Replacement for MCAT50-C1-105U sent in on RGA# R-45393.|Y
01|21298|1|2|Please note the NCAT50-C1-105U can be used in place of|Y
01|21298|1|3|MCAT50-C1-105U which are now considered specials.|Y
01|21298|1|4|Please note your normal dicount on this item is 32%|Y
01|21298|1|5|per Cindy in Inside Sales we can offer you a one-time|Y
01|21298|1|6|discount of 45% to have the un-repairable holder|Y
01|21298|1|7|replaced.|Y
01|21308|1|1|Repair of customer's 1x CNCH202LFA-M s/n: 8005|Y
01|21308|1|2|Reference RGA# T-45395|Y
01|21308|3|1|Special WW-CN180R003A for Baker Hughes CNCH200LFA-M|Y
01|21308|3|2|Final part number and delivery are pending.|Y
01|21322|1|1|Non-Coolant Through|Y
01|21322|2|1|Coolant Through|Y
01|21324|1|1|4pcs B/O ETA 4 weeks|Y
01|21337|1|1|ETA 11/24 or 12/2 ARO|Y
01|21342|15|1|Holder is a non-stock standard and once a purchase|Y
01|21342|15|2|order is placed it cannot be cancelled or returned.|Y
01|21342|15|3|1-pc 2 weeks balance ETA 12 to 13 Weeks|Y
01|21342|15|4|#4696-NIK14|Y
01|21351|1|1|Repair of customer's 1x HSK100A-C1-135|Y
01|21351|1|2|Reference RGA# R-45415|Y
01|21351|7|1|Unit must be cleaned up reassembled and re-greased.|Y
01|21353|1|1|Lyndex-Nikken Quote 4693-NIK14|Y
01|21353|1|2|Net price reflects replacement for repair|Y
01|21353|1|3|of RGA: R-45261.|Y
01|21354|1|1|This item is listed at your NET cost|Y
01|21360|1|1|ETA (2pcs) 9-11weeks  (1pc) 15-16weeks on balance|Y
01|21363|9|1|No charge as a courtesy to the customer.|Y
01|21397|1|1|Repair of customer's 1x C40RA-0025M s/n: 33099 09|Y
01|21397|1|2|Reference RGA# R-45366|Y
01|21397|2|1|Resurface spindles.|Y
01|21397|2|2|Replace all bearings seals and o-rings.|Y
01|21420|1|1|Repair of customer's 2x PF-2|Y
01|21420|1|2|Reference RGA# R-45421|Y
01|21420|2|1|Repair parts below are for PF-2 #1|Y
01|21420|3|1|N Style batteries must be replaced.|Y
01|21420|5|1|Unit must be re-calibrated.|Y
01|21420|6|1|Repair parts below are for PF-2 #2|Y
01|21420|10|1|N Style batteries must be replaced.|Y
01|21421|1|1|Shrink Fit Unit + 10 standard GL CAT40 Holders|Y
01|21423|19|2|NT05-SET(S) Slotted 10-PC Collet Set|Y
01|21423|20|1|Slotted Tap Collet Set 10-PC 5/16-7/8|Y
01|21423|21|2|Slotted Tap Collet Set 7-PC 12/16-1.3/8|Y
01|21449|5|1|SK25-20A|Y
01|21454|1|1|Balance in 1-2 Weeks|Y
01|21454|5|1|12 pcs in 2 weeks balance in 8 weeks. Note that this|Y
01|21454|5|2|item is listed at your NET cost.|Y
01|21454|9|1|Note this item is listed at your NET cost.|Y
01|21471|1|1|This item is listed at your NET cost|Y
01|21471|5|1|This item is listed at your NET cost|Y
01|21493|1|1|Repair of customer's 1x H100A-MRAM s/n: 43307 01|Y
01|21493|1|2|Reference RGA# R-45348|Y
01|21493|2|1|Bearings seals and o-rings must be replaced.|Y
01|21493|2|2|Labor charges are included.|Y
01|21512|1|1|From our gently used inventory|Y
01|21517|1|1|Repair of customer's 1x PF-2|Y
01|21517|1|2|Reference RGA# R-45436|Y
01|21517|6|1|N Style batteries must be replaced.|Y
01|21517|7|1|Unit must be re-assembled and re-calibrated.|Y
01|21518|1|1|1 pc on 11/24 if ordered by 11/19 balance in 8 weeks.|Y
01|21518|3|1|2 pcs on 11/24 if ordered by 11/19.|Y
01|21539|1|1|Discount based upon demo unit.|Y
01|21543|1|1|s/n 12345  Ready in 2 weeks|Y
01|21543|1|2|let's use rebuilt table|N
01|21543|11|1|For Lefty Table Only|N
01|21543|13|1|Pick Air or Hydraulic Supply|N
01|21543|17|1|Made in Taiwan. Crank Type|N
01|21543|19|1|Confirm pitch between CNC to TAT|N
01|21543|24|1|Make sure to sell with X-6B|N
01|21543|27|1|Nikken Made Dead Length Front Actuate|N
01|21543|28|1|US Made Rear Actuate Crank Style|N
01|21543|30|1|US Made with Air switch|N
01|21543|33|1|Works for Air or Hyd|N
01|21543|46|1|Kaz to install. cost $5000|N
01|21543|46|2|Includes Hotel airplane ticket.....|N
01|21543|48|1|DMG Mori with DDR Drive Unit|Y
01|21543|50|1|AA21 Installation|N
01|21543|52|1|$1000 tooling certificate included|Y
01|21546|1|1|Balance in 1-2 Weeks|Y
01|21561|4|1|Balance in 5 weeks|Y
01|21563|2|1|*Non-standard stock item|Y
01|21571|5|1|This is listed at your NET cost|Y
01|21576|2|1|*2 wrenches required|Y
01|21585|1|1|This item is listed at your NET cost|Y
01|21589|1|1|Repair of customer's WK-ZWS3-BT50-NUC12-E s/n: 20739 02|Y
01|21589|1|2|Reference RGA# R-45359|Y
01|21589|2|1|Replacing the Nikken chuck no charge for chuck as this|Y
01|21589|2|2|has been invoiced on parts order Inv# 2044223.|Y
01|21589|2|3|Charges are to replace spindle bearings and labor|Y
01|21589|2|4|charges.|Y
01|21593|1|1|s/n 12345  Ready in 2 weeks|Y
01|21593|1|2|let's use rebuilt table|N
01|21593|15|1|Kaz to install. cost $5000|N
01|21593|15|2|Includes Hotel airplane ticket.....|Y
01|21593|15|3|Machine has to havexxxxxx|Y
01|21593|17|1|$1000 tooling certificate included|Y
01|21605|5|1|Non-Cancelable & Non-Returnable|Y
01|21605|8|1|Non-Cancelable & Non-Returnable|Y
01|21605|9|1|Same as PS-B64-1M|Y
01|21619|1|1|*Non-standard stock item at Lyndex-Nikken|Y
01|21660|1|1|Quoting replacements for customer's CAT40-C1.1/4-105U|Y
01|21660|1|2|which were sent in for evaluation on RGA# R-45455.|Y
01|21660|1|3|These units have too much damage and are un-repairable.|Y
01|21660|1|4|Nick Mazis has extended customer's discount to 40%|Y
01|21660|1|5|as a one-time courtesy so they can replace their|Y
01|21660|1|6|un-repairable holders.|Y
01|21685|1|1|Balance in 1-2 Weeks|Y
01|21685|5|1|12 pcs in 2 weeks balance in 6-8 weeks. Note that this|Y
01|21685|5|2|item is listed at your NET cost.|Y
01|21685|9|1|Note this item is listed at your NET cost.|Y
01|21686|1|1|Balance in 1-2 Weeks|Y
01|21686|5|1|12 pcs in 2 weeks balance in 6-8 weeks. Note that this|Y
01|21686|5|2|item is listed at your NET cost.|Y
01|21686|9|1|Note this item is listed at your NET cost.|Y
01|21688|1|1|Balance in 1-2 Weeks|Y
01|21690|1|1|Balance in 1-2 Weeks|Y
01|21705|1|1|Net Price Each|Y
01|21705|1|2|Non-Cancelable & Non-Returnable|Y
01|21707|32|1|Price on above holder is NET charge|Y
01|21719|30|1|SKJ25-22.5C: SK25 22.5mm Coolant Cap|Y
01|21719|32|1|SKJ25-24C: 24mm  Coolant Cap|Y
01|21801|1|1|Tooling Certificate Number: 8112-511-100814|Y
01|21820|5|1|RAH Installation by Lyndex-Nikken Engineering Staff.|Y
01|21820|5|2|This is listed at your NET cost|Y
01|21869|1|1|With J Nut|Y
01|21869|2|1|With J Nut|Y
01|21869|3|1|With J Nut|Y
01|21894|1|1|3.02 Gage length|Y
01|21894|2|1|2.87 Gage length|Y
01|21905|1|1|Balance of 6 pcs in 9-10 weeks|Y
01|21944|2|1|This item is listed at your NET cost|Y
01|21965|1|1|This item is listed at your NET cost|Y
01|21965|2|1|This item is listed at your NET cost|Y
01|21970|1|1|40% discount reflects one-time coustesy to replace|Y
01|21970|1|2|customer's 1x CAT40-MMC8C-90U with broken draw screw.|Y
01|22040|26|1|Lyndex-Nikken to Switch out High Speed Standard Nut w/|Y
01|22040|26|2|High Speed Coolant Nut|Y
01|22048|1|1|Repair of customer's CNC250 s/n: n/a|Y
01|22048|1|2|Reference RGA# T-42537|Y
01|22048|18|1|Labor for Scale modification/installation|Y
01|22048|27|1|Charge is for painting the body of customer's CNC250.|Y
01|22048|29|1|Motor gear for Siemens Motor part number of gear is|Y
01|22048|29|2|TBD upon receipt of motor.|Y
01|22048|29|3|Cost of gear can be up to $400.00|Y
01|22049|19|1|Motor Cover for CNC200L|Y
01|22049|20|1|Motor Gear for Siemens Motor part number of gear is|Y
01|22049|20|2|TBD upon receipt of motor.|Y
01|22049|20|3|Costo of gear can be up to $400.00|Y
01|22049|21|1|Charge is for painting the body of customer's CNC200L.|Y
01|22054|1|1|KM20-1/4Q|Y
01|22056|2|1|Delivery 10 to 12 Weeks|Y
01|22072|1|1|Repair of customer's 2x C50RAM-ER32-285ST|Y
01|22072|1|2|s/n: 3083 01 & 60 703 439 03|Y
01|22072|1|3|Reference RGA# R-45430|Y
01|22072|2|1|Repair of C50-ER32-285ST s/n: 3083 03|Y
01|22072|2|2|Cover is damaged must be replaced.|Y
01|22072|2|3|Spindle must be resurfaced.|Y
01|22072|2|4|All bearings gears and o-rings must be replaced.|Y
01|22072|2|5|Labor is included.|Y
01|22072|3|1|Repair of 1x C50RAM-ER32-285ST s/n: 60 703 439 03|Y
01|22072|3|2|Cover and mounting hardware are damaged these must be|Y
01|22072|3|3|replaced.  Spindle needs to be resurfaced.|Y
01|22072|3|4|All bearings gears and o-rings must be replaced.|Y
01|22072|3|5|Labor is included.|Y
01|22080|1|1|Non-Cancelable & Non-Returnable|Y
01|22080|2|1|Non-Cancelable & Non-Returnable|Y
01|22080|3|1|Non-Cancelable & Non-Returnable|Y
01|22090|5|1|BT40-SK6-60P|Y
01|22101|2|1|This line is listed at your NET cost|Y
01|22122|1|2|This item is a standard non stock and once a purchase|Y
01|22122|1|3|order is placed it cannot be cancelled or returned.|Y
01|22132|1|1|This item is listed at your NET cost|Y
01|22132|2|1|This item is listed at your NET cost|Y
01|22132|3|1|This item is listed at your NET cost|Y
01|22164|5|1|Non standard stock item cannot be cancelled or|Y
01|22164|5|2|returned.|Y
01|22164|8|1|Special Pricing on request. This is a non-standard|Y
01|22164|8|2|stock item and cannot be cancelled or returned.|Y
01|22171|1|1|Repair of customer's 2x OK101-79000 s/n: AL004 & AL005|Y
01|22171|1|2|Reference RGA# R-45465|Y
01|22171|2|1|OK101-79000 s/n: AL004|Y
01|22171|2|2|Clutch bearings seals o-rings must be replaced.|Y
01|22171|2|3|Labor is included.|Y
01|22171|3|1|OK101-79000 s/n: AL005|Y
01|22171|3|2|Clutch bearings seals o-rings must be replaced.|Y
01|22171|3|3|Labor is included.|Y
01|22213|1|1|Modi from CAT40-C1-85U (2 holes)|Y
01|22213|1|2|Non-Cancelable & Non-Returnable|Y
01|22227|1|1|Reference RGA# T-45449|Y
01|22228|1|1|Discount is a one-time courtesy to have the customer|Y
01|22228|1|2|replace their existing T/C Tap holder instead of|Y
01|22228|1|3|sending in for repair.|Y
01|22269|1|1|Non-Cancelable & Non-Returnable|Y
01|22272|1|1|Repair of customer's CNC300 s/n: 1217|Y
01|22272|1|2|Reference RGA# T-45435|Y
01|22272|3|1|Please advise size once known.|N
01|22275|1|1|This item is listed at your NET cost|Y
01|22275|2|1|This item is listed at your NET cost|Y
01|22275|3|1|This item is listed at your NET cost|Y
01|22322|10|1|This Retention Knob is for the Fadal Machine|Y
01|22322|11|1|This Retention Knob is for the Haas Machine|Y
01|22375|1|1|Repair of customer's 1x 05.1311.7141.505 s/n: 0702/16|Y
01|22375|1|2|Lyndex-Nikken Part# MZMP47-ER32Z|Y
01|22375|1|3|Reference RGA# R-45470|Y
01|22375|2|1|Spindles must be resurfaced.|Y
01|22375|2|2|All bearings seals and o-rings must be replaced.|Y
01|22375|2|3|Includes labor charges.|Y
01|22408|1|1|Repair of customer's 1x TAT-105 s/n: 1693|Y
01|22408|1|2|Reference RGA# T-45490|Y
01|22416|1|1|This item is listed at your NET cost|Y
01|22416|2|1|This item is listed at your NET cost|Y
01|22416|3|1|This item is listed at your NET cost|Y
01|22417|1|1|This item is listed at your NET cost|Y
01|22417|2|1|This item is listed at your NET cost|Y
01|22417|3|1|This item is listed at your NET cost|Y
01|22426|12|1|Balance is 1-2 weeks|Y
01|22434|1|1|Discount reflects one-time courtesy to replace holders|Y
01|22434|1|2|as opposed to sending in for repair.|Y
01|22474|2|1|Delivery is ten business days upon receipt of a|Y
01|22474|2|2|purchase order. Once the order is placed the item|Y
01|22474|2|3|is non-cancellable non-returnable.|Y
01|22475|1|1|This item is listed at your NET cost|Y
01|22482|2|1|This item is listed at your NET cost|Y
01|22482|3|1|This item is listed at your NET cost|Y
01|22491|1|1|SF Unit + 10 standard GL CAT50 Shrink Fit Holders|Y
01|22497|1|1|s/n 12345  Ready in 2 weeks|Y
01|22497|1|2|let's use rebuilt table|N
01|22497|24|1|Make sure to sell with X-6B|N
01|22497|27|1|Nikken Made Dead Length Front Actuate|N
01|22497|28|1|US Made Rear Actuate Crank Style|N
01|22497|30|1|US Made with Air switch|N
01|22497|33|1|Works for Air or Hyd|N
01|22497|46|1|Kaz to install. cost $5000|N
01|22497|46|2|Includes Hotel airplane ticket.....|N
01|22497|48|1|DMG Mori with DDR Drive Unit|Y
01|22497|50|1|AA21 Installation|N
01|22497|52|1|$1000 tooling certificate included|Y
01|22499|1|1|s/n 12345  Ready in 2 weeks|Y
01|22499|1|2|let's use rebuilt table|N
01|22499|11|1|For Lefty Table Only|N
01|22499|13|1|Pick Air or Hydraulic Supply|N
01|22499|17|1|Made in Taiwan. Crank Type|N
01|22499|19|1|Confirm pitch between CNC to TAT|N
01|22499|24|1|Make sure to sell with X-6B|N
01|22499|27|1|Nikken Made Dead Length Front Actuate|N
01|22499|28|1|US Made Rear Actuate Crank Style|N
01|22499|30|1|US Made with Air switch|N
01|22499|33|1|Works for Air or Hyd|N
01|22499|46|1|Kaz to install. cost $5000|N
01|22499|46|2|Includes Hotel airplane ticket.....|N
01|22499|48|1|DMG Mori with DDR Drive Unit|Y
01|22499|50|1|AA21 Installation|N
01|22499|52|1|$1000 tooling certificate included|Y
01|22501|1|1|s/n 12345  Ready in 2 weeks|Y
01|22501|1|2|let's use rebuilt table|N
01|22501|17|1|Made in Taiwan. Crank Type|N
01|22501|19|1|Confirm pitch between CNC to TAT|N
01|22501|24|1|Make sure to sell with X-6B|N
01|22501|27|1|Nikken Made Dead Length Front Actuate|N
01|22501|28|1|US Made Rear Actuate Crank Style|N
01|22501|30|1|US Made with Air switch|N
01|22501|33|1|Works for Air or Hyd|N
01|22501|46|1|Kaz to install. cost $5000|N
01|22501|46|2|Includes Hotel airplane ticket.....|N
01|22501|48|1|DMG Mori with DDR Drive Unit|Y
01|22501|50|1|AA21 Installation|N
01|22501|52|1|$1000 tooling certificate included|Y
01|22524|1|1|SF Unit + 10 standard GL CAT40 Shrink Fit Holders|Y
01|22527|5|1|$20.00 Net Charge to Modify for Use With DA Nut|Y
01|22546|1|1|This item is listed at your NET cost|Y
01|22560|2|1|SF Unit + 10 Standard GL CAT40 Shrink Fit Holders|Y
01|22563|1|1|Repair of customer's 5AX-2MT-105-120FA-M s/n: 8110|Y
01|22563|1|2|Reference RGA# T-45434|Y
01|22563|19|1|Power Cable part number pending.|Y
01|22571|1|1|Repair of customer's 1x T32106 s/n: A0300|Y
01|22571|1|2|Reference RGA# R-45492|Y
01|22571|2|1|Spindle and gears must be replaced.|Y
01|22571|2|2|Bearings seals and o-rings must be replaced.|Y
01|22571|2|3|Labor charges included.|Y
01|22572|1|1|Delivery is 5 weeks upon receipt of purchase order.|Y
01|22596|1|1|This item is listed at your NET cost|Y
01|22596|2|1|2.36 gage length|Y
01|22596|3|1|4 gage length|Y
01|22596|4|1|2.5 gage length|Y
01|22596|5|1|4 gage length|Y
01|22596|6|1|2.5 gage length|Y
01|22596|7|1|4 gage length|Y
01|22598|1|1|W/ PS-N100VE Installed|Y
01|22613|8|1|Non-Cancelable & Non-Returnable|Y
01|22621|1|1|Repair of customer's 1x 5AX-201 s/n: 1104|N
01|22621|1|2|Reference RGA# T-45534|Y
01|22632|1|1|This is consider a Special and once a purchase order|Y
01|22632|1|2|is placed it cannot be cancelled or returned.|Y
01|22663|12|1|The above holder will need to be quoted as a special|Y
01|22663|12|2|once stock has been depleted. Balance of 22pcs SPECIAL|Y
01|22663|32|1|The above holder will need to be quoted as a special|Y
01|22663|32|2|once stock has been depleted. Balance of 50pcs =special|Y
01|22665|1|1|This item is listed at your NET cost|Y
01|22710|4|1|*Note above collets have internal & external threads*|Y
01|22728|1|1|Quoting customer a replacement unit.  Existing unit|Y
01|22728|1|2|was sent in on RGA# R-45489.  It has been determined|Y
01|22728|1|3|the existing unit is unrepairable.|Y
01|22728|1|4|As a one-time coutesy I am able to offer you 40% off|Y
01|22728|1|5|a new holder as opposed to your normal discount of 35%.|Y
01|22733|1|1|Repair of customer's 1x CAT50-C3/4-105U|Y
01|22733|1|2|Reference RGA# R-45466|Y
01|22737|1|1|This item is listed at your NET cost|Y
01|22768|1|1|Non-Cancelable & Non-Returnable|Y
01|22768|1|2|Net Price Each|Y
01|22796|2|1|This item at no charge as a courtesy to the EU|Y
01|22806|2|1|Setting Fixture for X and Z tools|Y
01|22806|3|1|Spanner wrench for ER32 nuts|Y
01|22816|2|1|C40FHM-ER25-195IC-65TP modified from internal coolant|Y
01|22816|2|2|to non-coolant by Mimatic. Tool will not be re-labeled|Y
01|22816|2|3|due to serial number.|Y
01|22831|1|1|Repair of customer's 1x CAT50-C3/4-105U|Y
01|22831|1|2|Reference RGA# R-45466|Y
01|22831|1|3|Please note we cannot guarantee this repair due to|Y
01|22831|1|4|bad run-out.|Y
01|22839|1|1|Repair of customer's 1x CAT50-C1-105U|Y
01|22839|1|2|Reference RGA# R-45487|Y
01|22844|1|1|Repair of customer's 1x NCAT50-C1-105U|Y
01|22844|1|2|Reference RGA# R-45427|Y
01|22850|1|1|Repair of customer's 1x CAT40-NPU13-105U|Y
01|22850|1|2|Reference RGA# R-45495|Y
01|22862|1|1|Repair of customer's 1x CAT50-Z12-130U|Y
01|22862|1|2|Reference RGA# R-45521|Y
01|22862|2|1|3/8 Ball Bearings|Y
01|22862|3|1|3/16 ball bearings|Y
01|22884|1|1|Non-Cancelable & Non-Returnable|Y
01|22889|1|1|Above item is quoted @ NET PRICE each|Y
01|22893|3|1|HO9M10-U-743 Special Howa Chuck|Y
01|22893|3|2|This item is considered Special and once a purchase|Y
01|22893|3|3|order is placed it can not be cancelled or returned|Y
01|22893|3|4|Manufacturing completion date is based upon receipt|Y
01|22893|3|5|of purchase order after final clarification/approval|Y
01|22893|3|6|drawings have been received. Please allow additional|Y
01|22893|3|7|time for the approval drawing process.|Y
01|22893|3|8|Delivery: 14 Weeks|Y
01|22899|1|1|Repair of customer's PF-2 #1|Y
01|22899|1|2|Reference RGA# R-45537|Y
01|22899|4|1|N Style battery|Y
01|22899|5|1|Labor charges for PF-2 #1.|Y
01|22899|5|2|Unit must be recalibrated.|Y
01|22899|6|1|Repair of customer's PF-2 #2|Y
01|22899|6|2|Reference RGA# R-45537|Y
01|22899|11|1|N Style Batteries|Y
01|22899|12|1|Labor charges for PF-2 #2.|Y
01|22899|12|2|Unit must also be recalibrated.|Y
01|22942|1|1|C40HC-0625-4.00-DIN With Removal Set Screws|Y
01|22942|1|2|CAT40  Hydraulic Holder 5/8 X 4.00 Gage|Y
01|22942|2|1|C40HC-0625-4.00-DIN With Removal Set Screws|Y
01|22942|2|2|CAT40 Hydraulic Holder 5/8 X 4.00 Gage|Y
01|22942|3|1|C50HC-0625-4.00-DIN With Removal Set Screws|Y
01|22942|3|2|CAT50 Hydraulic Holder 5/8 X 4.00 Gage|Y
01|22942|4|1|C50HC-0625-4.00-DIN With Removal Set Screws|Y
01|22942|4|2|CAT50 Hydraulic Holder 5/8 X 4.00 Gage|Y
01|22942|5|1|HSK63A-HC0625-4.00-DIN With Removal Set Screws|Y
01|22942|5|2|HSK63A Hydraulic Holder 5/8 X 4.00 Gage|Y
01|22942|6|1|HSK63A-HC0625-4.00-DIN With Removal Set Screws|Y
01|22942|6|2|HSK63A Hydraulic Holder 5/8 X 4.00 Gage|Y
01|22948|1|1|Quoting replacement holder at additional 5% discount|Y
01|22948|1|2|as a one time courtesy.  Customer sent in their unit|Y
01|22948|1|3|for evaluation on RGA# R-45551 it has been determined|Y
01|22948|1|4|this unit is un-repairable.|Y
01|22962|5|1|CN252B029 Gasket|Y
01|22962|6|1|CN252B037 Gasket|Y
01|22962|7|1|CN252B037 Gasket|Y
01|22962|30|1|Customer's CN252B004 Rear Hub needs to be plated|Y
01|22962|30|2|and re-ground.|Y
01|22964|1|1|Non-Cancelable & Non-Returnable|Y
01|22966|1|1|5  Ready in 2 weeks|Y
01|22966|1|2|Skinny deal special discount provided|N
01|22966|1|3|1|Y
01|22966|1|4|2|Y
01|22966|1|5|`|N
01|22966|12|1|For Lefty Table Only|N
01|22966|14|1|Pick Air or Hydraulic Supply|N
01|22966|18|1|Made in Taiwan. Crank Type|N
01|22966|20|1|Confirm pitch between CNC to TAT|N
01|22966|25|1|Make sure to sell with X-6B|N
01|22966|47|1|Kaz to install. cost $5000|N
01|22966|47|2|Includes Hotel airplane ticket.....|N
01|22966|53|1|$1000 tooling certificate included|Y
01|22967|1|1|OH HERRO THERE...THIS IS A TEST COMMENT|Y
01|22967|1|2|let's use rebuilt table|N
01|22967|1|3|IT'S ALL ABOUT THE BASS THE BASS THE BASS NO TREBLE|N
01|22967|17|1|Made in Taiwan. Crank Type|N
01|22967|17|2|PAINT IT GREEN|Y
01|22967|27|1|Nikken Made Dead Length Front Actuate|N
01|22967|29|1|US Made Rear Actuate Crank Style|N
01|22967|31|1|US Made with Air switch|N
01|22967|34|1|Works for Air or Hyd|N
01|22967|47|1|Kaz to install. cost $5000|N
01|22967|47|2|Includes Hotel airplane ticket.....|N
01|22967|49|1|DMG Mori with DDR Drive Unit|Y
01|22967|51|1|AA21 Installation|N
01|22967|53|1|$1000 tooling certificate included|Y
01|22968|1|1|this is a test for the sales team|Y
01|22968|1|2|they are cheap and have money|N
01|22968|17|1|Paint it pink|Y
01|22968|27|1|Nikken Made Dead Length Front Actuate|N
01|22968|30|1|US Made Rear Actuate Crank Style|N
01|22968|32|1|US Made with Air switch|N
01|22968|35|1|Works for Air or Hyd|N
01|22968|49|1|Kaz to install. cost $5000|N
01|22968|49|2|Includes Hotel airplane ticket.....|N
01|22968|51|1|DMG Mori with DDR Drive Unit|Y
01|22968|55|1|$1000 tooling certificate included|Y
01|22969|1|1|s/n 12345  Ready in 8 weeks|Y
01|22969|1|2|Customer is watining on PO for another 8 tables|N
01|22969|19|1|Confirm pitch between CNC to TAT|N
01|22969|28|1|US Made Rear Actuate Crank Style|N
01|22969|46|1|Kaz to install. cost $5000|N
01|22969|46|2|Includes Hotel airplane ticket.....|N
01|22969|52|1|$1000 tooling certificate included|Y
01|22970|1|1|this is a test for sales team|Y
01|22970|1|2|Walden make sure to put xxxxx|N
01|22970|1|3|ac100v on-clamp special 3.75m cable included|Y
01|22970|1|4|1111111111222222222233333333334444444444555555555556666|N
01|22970|1|5|3|N
01|22970|1|6|4|N
01|22970|1|7|gave 20% discount as per hiro|N
01|22970|17|1|paint it green|Y
01|22970|27|1|Nikken Made Dead Length Front Actuate|N
01|22970|30|1|US Made Rear Actuate Crank Style|N
01|22970|32|1|US Made with Air switch|N
01|22970|35|1|Works for Air or Hyd|N
01|22970|48|1|Kaz to install. cost $5000|N
01|22970|48|2|Includes Hotel airplane ticket.....|N
01|22970|50|1|DMG Mori with DDR Drive Unit|Y
01|22970|52|1|AA21 Installation|N
01|22970|54|1|$1000 tooling certificate included|Y
01|22971|1|1|This is a Sale team test|Y
01|22971|1|2|let's use rebuilt table|N
01|22971|1|3|Hey|N
01|22971|17|1|Made in Taiwan. Crank Type|N
01|22971|46|1|Kaz to install. cost $5000|N
01|22971|46|2|Includes Hotel airplane ticket.....|N
01|22971|48|1|DMG Mori with DDR Drive Unit|Y
01|22971|50|1|AA21 Installation|N
01|22971|52|1|$1000 tooling certificate included|Y
01|22972|1|1|Test Quote for Sales|Y
01|22972|1|2|let's use rebuilt table|N
01|22972|17|1|Paint it green|N
01|22972|27|1|Nikken Made Dead Length Front Actuate|N
01|22972|29|1|US Made Rear Actuate Crank Style|N
01|22972|31|1|US Made with Air switch|N
01|22972|34|1|Works for Air or Hyd|N
01|22972|47|1|Kaz to install. cost $5000|N
01|22972|47|2|Includes Hotel airplane ticket.....|N
01|22972|49|1|DMG Mori with DDR Drive Unit|Y
01|22972|51|1|AA21 Installation|N
01|22972|53|1|$1000 tooling certificate included|Y
01|22973|1|1|This is a TEST for sales teem. Thank you!|Y
01|22973|1|2|let's use rebuilt table|N
01|22973|17|1|paint it green|Y
01|22973|27|1|Nikken Made Dead Length Front Actuate|N
01|22973|29|1|US Made Rear Actuate Crank Style|N
01|22973|31|1|US Made with Air switch|N
01|22973|34|1|Works for Air or Hyd|N
01|22973|47|1|Kaz to install. cost $5000|N
01|22973|47|2|Includes Hotel airplane ticket.....|N
01|22973|49|1|DMG Mori with DDR Drive Unit|Y
01|22973|51|1|AA21 Installation|N
01|22973|53|1|$1000 tooling certificate included|Y
01|22974|1|1|s/n 12345  Ready in 2 weeks|Y
01|22974|1|2|let's use rebuilt table|N
01|22974|11|1|For Lefty Table Only|N
01|22974|13|1|Pick Air or Hydraulic Supply|N
01|22974|17|1|Made in Taiwan. Crank Type|N
01|22974|19|1|Confirm pitch between CNC to TAT|N
01|22974|24|1|Make sure to sell with X-6B|N
01|22974|27|1|Nikken Made Dead Length Front Actuate|N
01|22974|28|1|US Made Rear Actuate Crank Style|N
01|22974|30|1|US Made with Air switch|N
01|22974|33|1|Works for Air or Hyd|N
01|22974|46|1|Kaz to install. cost $5000|N
01|22974|46|2|Includes Hotel airplane ticket.....|N
01|22974|48|1|DMG Mori with DDR Drive Unit|Y
01|22974|50|1|AA21 Installation|N
01|22974|52|1|$1000 tooling certificate included|Y
01|22975|1|1|s/n 12345  Ready in 2 weeks|Y
01|22975|1|2|let's use rebuilt table|N
01|22975|11|1|For Lefty Table Only|N
01|22975|13|1|Pick Air or Hydraulic Supply|N
01|22975|17|1|Made in Taiwan. Crank Type|N
01|22975|19|1|Confirm pitch between CNC to TAT|N
01|22975|24|1|Make sure to sell with X-6B|N
01|22975|27|1|Nikken Made Dead Length Front Actuate|N
01|22975|28|1|US Made Rear Actuate Crank Style|N
01|22975|30|1|US Made with Air switch|N
01|22975|33|1|Works for Air or Hyd|N
01|22975|46|1|Kaz to install. cost $5000|N
01|22975|46|2|Includes Hotel airplane ticket.....|N
01|22975|48|1|DMG Mori with DDR Drive Unit|Y
01|22975|50|1|AA21 Installation|N
01|22975|52|1|$1000 tooling certificate included|Y
01|22976|1|1|s/n 12345  Ready in 2 weeks|Y
01|22976|1|2|let's use rebuilt table|N
01|22976|17|1|Made in Taiwan. Crank Type|N
01|22976|24|1|Make sure to sell with X-6B|N
01|22976|46|1|Kaz to install. cost $5000|N
01|22976|46|2|Includes Hotel airplane ticket.....|N
01|22976|52|1|$1000 tooling certificate included|Y
01|22977|1|1|s/n XXXXX|Y
01|22977|1|2|Test|N
01|22977|17|1|Paint it green|N
01|22977|30|1|US Made with Air switch|N
01|22978|1|1|this is a test sales teams|Y
01|22978|1|2|walen made sure to paint the table|Y
01|22978|1|3|give only 20%|N
01|22978|1|4|no more|N
01|22978|17|1|paint it green|Y
01|22978|27|1|Nikken Made Dead Length Front Actuate|N
01|22978|29|1|US Made Rear Actuate Crank Style|N
01|22978|31|1|US Made with Air switch|N
01|22978|34|1|Works for Air or Hyd|N
01|22978|47|1|Kaz to install. cost $5000|N
01|22978|47|2|Includes Hotel airplane ticket.....|N
01|22978|49|1|DMG Mori with DDR Drive Unit|Y
01|22978|51|1|AA21 Installation|N
01|22978|53|1|$1000 tooling certificate included|Y
01|22979|1|1|s/n 12345  Ready in 2 weeks|Y
01|22979|1|2|let's use rebuilt table|N
01|22979|11|1|For Lefty Table Only|N
01|22979|13|1|Pick Air or Hydraulic Supply|N
01|22979|17|1|Made in Taiwan. Crank Type|N
01|22979|19|1|Confirm pitch between CNC to TAT|N
01|22979|24|1|Make sure to sell with X-6B|N
01|22979|27|1|Nikken Made Dead Length Front Actuate|N
01|22979|28|1|US Made Rear Actuate Crank Style|N
01|22979|30|1|US Made with Air switch|N
01|22979|33|1|Works for Air or Hyd|N
01|22979|46|1|Kaz to install. cost $5000|N
01|22979|46|2|Includes Hotel airplane ticket.....|N
01|22979|48|1|DMG Mori with DDR Drive Unit|Y
01|22979|50|1|AA21 Installation|N
01|22979|52|1|$1000 tooling certificate included|Y
01|22980|1|1|this is a test for sales team|Y
01|22980|1|2|Walden make sure to put xxxx|N
01|22980|17|1|paint it green|Y
01|22980|27|1|Nikken Made Dead Length Front Actuate|N
01|22980|29|1|US Made Rear Actuate Crank Style|N
01|22980|31|1|US Made with Air switch|N
01|22980|34|1|Works for Air or Hyd|N
01|22980|47|1|Kaz to install. cost $5000|N
01|22980|47|2|Includes Hotel airplane ticket.....|N
01|22980|49|1|DMG Mori with DDR Drive Unit|Y
01|22980|51|1|AA21 Installation|N
01|22980|53|1|$1000 tooling certificate included|Y
01|22981|1|1|s/n 12345  Ready in 2 weeks|Y
01|22981|1|2|let's use rebuilt table|N
01|22981|11|1|For Lefty Table Only|N
01|22981|13|1|Pick Air or Hydraulic Supply|N
01|22981|17|1|Made in Taiwan. Crank Type|N
01|22981|19|1|Confirm pitch between CNC to TAT|N
01|22981|24|1|Make sure to sell with X-6B|N
01|22981|27|1|Nikken Made Dead Length Front Actuate|N
01|22981|28|1|US Made Rear Actuate Crank Style|N
01|22981|30|1|US Made with Air switch|N
01|22981|33|1|Works for Air or Hyd|N
01|22981|46|1|Kaz to install. cost $5000|N
01|22981|46|2|Includes Hotel airplane ticket.....|N
01|22981|48|1|DMG Mori with DDR Drive Unit|Y
01|22981|50|1|AA21 Installation|N
01|22981|52|1|$1000 tooling certificate included|Y
01|22982|1|1|this is a test for sales team-halalala|Y
01|22982|1|2|they are making money doing nothing|N
01|22982|1|3|allah akbar|N
01|22982|1|4|i like to eat cheese while drinking wine|Y
01|22982|1|5|Thank you very much for the order. Have a merry christm|Y
01|22982|18|1|paint it green|Y
01|22982|28|1|Nikken Made Dead Length Front Actuate|N
01|22982|29|1|US Made Rear Actuate Crank Style|N
01|22982|31|1|US Made with Air switch|N
01|22982|34|1|Works for Air or Hyd|N
01|22982|47|1|Kaz to install. cost $5000|N
01|22982|47|2|Includes Hotel airplane ticket.....|N
01|22982|49|1|DMG Mori with DDR Drive Unit|Y
01|22982|51|1|AA21 Installation|N
01|22982|53|1|$1000 tooling certificate included|Y
01|22983|1|1|s/n 12345  Ready in 2 weeks|Y
01|22983|1|2|let's use rebuilt table|N
01|22983|11|1|For Lefty Table Only|N
01|22983|13|1|Pick Air or Hydraulic Supply|N
01|22983|17|1|Made in Taiwan. Crank Type|N
01|22983|19|1|Confirm pitch between CNC to TAT|N
01|22983|24|1|Make sure to sell with X-6B|N
01|22983|27|1|Nikken Made Dead Length Front Actuate|N
01|22983|28|1|US Made Rear Actuate Crank Style|N
01|22983|30|1|US Made with Air switch|N
01|22983|33|1|Works for Air or Hyd|N
01|22983|46|1|Kaz to install. cost $5000|N
01|22983|46|2|Includes Hotel airplane ticket.....|N
01|22983|48|1|DMG Mori with DDR Drive Unit|Y
01|22983|50|1|AA21 Installation|N
01|22983|52|1|$1000 tooling certificate included|Y
01|22984|1|1|s/n 12345  Ready in 2 weeks|Y
01|22984|1|2|let's use rebuilt table|N
01|22984|11|1|For Lefty Table Only|N
01|22984|13|1|Pick Air or Hydraulic Supply|N
01|22984|17|1|Made in Taiwan. Crank Type|N
01|22984|19|1|Confirm pitch between CNC to TAT|N
01|22984|24|1|Make sure to sell with X-6B|N
01|22984|27|1|Nikken Made Dead Length Front Actuate|N
01|22984|28|1|US Made Rear Actuate Crank Style|N
01|22984|30|1|US Made with Air switch|N
01|22984|33|1|Works for Air or Hyd|N
01|22984|46|1|Kaz to install. cost $5000|N
01|22984|46|2|Includes Hotel airplane ticket.....|N
01|22984|48|1|DMG Mori with DDR Drive Unit|Y
01|22984|50|1|AA21 Installation|N
01|22984|52|1|$1000 tooling certificate included|Y
01|22985|1|1|s/n 12345  Ready in 2 weeks|Y
01|22985|1|2|let's use rebuilt table|N
01|22985|11|1|For Lefty Table Only|N
01|22985|13|1|Pick Air or Hydraulic Supply|N
01|22985|17|1|Made in Taiwan. Crank Type|N
01|22985|19|1|Confirm pitch between CNC to TAT|N
01|22985|24|1|Make sure to sell with X-6B|N
01|22985|27|1|Nikken Made Dead Length Front Actuate|N
01|22985|28|1|US Made Rear Actuate Crank Style|N
01|22985|30|1|US Made with Air switch|N
01|22985|33|1|Works for Air or Hyd|N
01|22985|46|1|Kaz to install. cost $5000|N
01|22985|46|2|Includes Hotel airplane ticket.....|N
01|22985|48|1|DMG Mori with DDR Drive Unit|Y
01|22985|50|1|AA21 Installation|N
01|22985|52|1|$1000 tooling certificate included|Y
01|22986|1|1|s/n 12345  Ready in 2 weeks|Y
01|22986|1|2|let's use rebuilt table|N
01|22986|11|1|For Lefty Table Only|N
01|22986|13|1|Pick Air or Hydraulic Supply|N
01|22986|17|1|Made in Taiwan. Crank Type|N
01|22986|19|1|Confirm pitch between CNC to TAT|N
01|22986|24|1|Make sure to sell with X-6B|N
01|22986|27|1|Nikken Made Dead Length Front Actuate|N
01|22986|28|1|US Made Rear Actuate Crank Style|N
01|22986|30|1|US Made with Air switch|N
01|22986|33|1|Works for Air or Hyd|N
01|22986|46|1|Kaz to install. cost $5000|N
01|22986|46|2|Includes Hotel airplane ticket.....|N
01|22986|48|1|DMG Mori with DDR Drive Unit|Y
01|22986|50|1|AA21 Installation|N
01|22986|52|1|$1000 tooling certificate included|Y
01|22987|1|1|THIS IS A TEST|Y
01|22987|1|2|PLS SHIPT IT WITHIN FY2014|N
01|22987|17|1|PAINT IT GREEN|Y
01|22987|36|1|Works for Air or Hyd|N
01|22987|49|1|Kaz to install. cost $5000|N
01|22987|49|2|Includes Hotel airplane ticket.....|N
01|22987|51|1|DMG Mori with DDR Drive Unit|Y
01|22987|53|1|AA21 Installation|N
01|22987|55|1|$1000 tooling certificate included|Y
01|22988|1|1|this isntest|N
01|22988|1|2|Walden I am just learning|N
01|22988|17|1|paint it green.|Y
01|22988|28|1|US Made Rear Actuate Crank Style|N
01|22988|47|1|Kaz to install. cost $5000|N
01|22988|47|2|Includes Hotel airplane ticket.....|N
01|22988|53|1|$1000 tooling certificate included|Y
01|22993|1|1|Repair of customer's 1x MNL12-ER32Z s/n: A2568|Y
01|22993|1|2|Reference RGA# R-45517|Y
01|22993|2|1|Collet nut must be replaced.|Y
01|22993|2|2|Bearings seals and o-rings must be replaced.|Y
01|22993|2|3|Labor charges are included.|Y
01|22998|1|1|Lyndex-Nikken Quote 22998|Y
01|22998|2|1|Pull Stud Included with above holder.|Y
01|23004|1|1|This item is listed at your NET cost|Y
01|23013|1|1|Repair of customer's MNL12-ER32Z-MS s/n: A1818|Y
01|23013|1|2|Reference RGA# R-45519|Y
01|23013|2|1|Spindles are damaged and must be replaced.|Y
01|23013|2|2|Bearings seals and o-rings must be replaced.|Y
01|23013|2|3|Labor charges included.|Y
01|23035|1|1|Mimatic 180196: Doosan ER25 Driven U-Turn Holder w/|Y
01|23035|1|2|External Coolant|Y
01|23035|2|1|Mimatic 180196: Doosan ER25 Driven U-Turn Holder w/|Y
01|23035|2|2|External Coolant|Y
01|23035|3|1|Mimatic 180196: Doosan ER25 Driven U-Turn Holder w/|Y
01|23035|3|2|External Coolant|Y
01|23041|1|1|s/n 12345  Ready in 2 weeks|Y
01|23041|1|2|let's use rebuilt table|N
01|23041|11|1|For Lefty Table Only|N
01|23041|13|1|Pick Air or Hydraulic Supply|N
01|23041|17|1|Made in Taiwan. Crank Type|N
01|23041|19|1|Confirm pitch between CNC to TAT|N
01|23041|24|1|Make sure to sell with X-6B|N
01|23041|27|1|Nikken Made Dead Length Front Actuate|N
01|23041|28|1|US Made Rear Actuate Crank Style|N
01|23041|30|1|US Made with Air switch|N
01|23041|33|1|Works for Air or Hyd|N
01|23041|46|1|Kaz to install. cost $5000|N
01|23041|46|2|Includes Hotel airplane ticket.....|N
01|23041|48|1|DMG Mori with DDR Drive Unit|Y
01|23041|50|1|AA21 Installation|N
01|23041|52|1|$1000 tooling certificate included|Y
01|23051|9|1|Estimated labor for Lyndex-Nikken to modify block|Y
01|23052|1|1|Lyndex Nikken Shrink Fit Package-  10 Standard Shrink|Y
01|23052|1|2|Holder Included. 3.15 gage length CAT40|Y
01|23069|1|1|CAT40-HC0750-82 Hydraulic Holder 3/4 with 82mm gage.|Y
01|23077|1|1|Mori T00169|Y
01|23077|2|1|Mori T00171|Y
01|23077|3|1|Mori T10091|Y
01|23083|1|1|s/n 12345  Ready in 2 weeks|Y
01|23083|1|2|let's use rebuilt table|N
01|23083|11|1|For Lefty Table Only|N
01|23083|13|1|Pick Air or Hydraulic Supply|N
01|23083|17|1|Made in Taiwan. Crank Type|N
01|23083|19|1|Confirm pitch between CNC to TAT|N
01|23083|24|1|Make sure to sell with X-6B|N
01|23083|27|1|Nikken Made Dead Length Front Actuate|N
01|23083|28|1|US Made Rear Actuate Crank Style|N
01|23083|30|1|US Made with Air switch|N
01|23083|33|1|Works for Air or Hyd|N
01|23083|46|1|Kaz to install. cost $5000|N
01|23083|46|2|Includes Hotel airplane ticket.....|N
01|23083|48|1|DMG Mori with DDR Drive Unit|Y
01|23083|50|1|AA21 Installation|N
01|23083|52|1|$1000 tooling certificate included|Y
01|23091|2|1|Machine: RoboDrill|Y
01|23091|2|2|Allison Transmission Dwg# AD-1158336|Y
01|23096|1|1|Discount reflects core trade-in.|Y
01|23096|1|2|Please note ETA to Lyndex-Nikken is 12-30-2014.|Y
01|23096|1|3|These will ship out upon receipt.|Y
01|23096|1|4|Reference RGA# R-45533|Y
01|23105|1|1|Discount is based upon a core replacement for|Y
01|23105|1|2|Lyndex-Nikken RGA: R-45461|Y
01|23123|3|1|wrench for collet nut|Y
01|23123|4|1|wrench for tool spindle|Y
01|23123|7|1|wrench for collet nut|Y
01|23123|8|1|wrench for tool spindle|Y
01|23130|1|1|Repair of customer's CAT40-NPU13-105U|Y
01|23130|1|2|Reference RGA# R-45555|Y
01|23130|4|1|3.97mm ball bearings|Y
01|23140|1|1|ref. T00201|Y
01|23151|1|1|Up to 2 additional pcs in 5-6 weeks|Y
01|23200|4|1|This line is listed at your NET cost|Y
01|23208|1|1|Normal discount is 10% as a courtesy we have extended|Y
01|23208|1|2|this discount to 35% for this repair only.|Y
01|23212|1|1|Shrink Fit Unit + 2 CAT40 Pots & 10 CAT40 SF Holders|Y
01|23233|1|1|Repair of customer's 5AX-4MT-105-120FA-M sn# 2025|N
01|23233|1|2|Reference Lyndex-Nikken RGA# T-43234|Y
01|23233|5|1|Plating and grinding of customer's original|Y
01|23233|5|2|pancake housings.|Y
01|23261|1|1|Balance in 6 Weeks|Y
01|23270|1|1|Repair of customer's 1x CAT50-UMT200U|Y
01|23270|1|2|Reference RGA# R-45567|Y
01|23270|4|1|Unit must also be recalibrated.|Y
01|23284|4|1|NSK-1/8 collet|Y
01|23302|1|1|This item is listed at your NET cost|Y
01|23315|50|1|Standard motors can be up to $3500.00|Y
01|23315|51|1|Standard power and feedback cables can be up to $750.00|Y
01|23322|1|1|Estimate includes worm shafts worm screws gears|Y
01|23322|1|2|bearings seals o-rings and other hard parts.|Y
01|23322|1|3|Motor and cable pricing is also included.|Y
01|23322|1|4|This estimate does not include new spindles or|Y
01|23322|1|5|modification of existing spindle.|Y
01|23324|1|1|From Lyndex-Nikken Slightly Used Inventory|Y
01|23344|3|1|This line is listed at your NET cost|Y
01|23369|1|1|TAM271851-50|Y
01|23369|2|1|TAM271851-51|Y
01|23369|3|1|TAM271851-52|Y
01|23369|4|1|TAM271851-53|Y
01|23369|5|1|TAM271851-54|Y
01|23369|6|1|TAM271851-55|Y
01|23369|7|1|TAM271851-56|Y
01|23369|8|1|TAM271851-57|Y
01|23369|9|1|TAM271851-58|Y
01|23369|10|1|TAM271851-59|Y
01|23369|11|1|TAM271851-60|Y
01|23369|12|1|TAM271851-61|Y
01|23369|13|1|TAM271851-62|Y
01|23369|14|1|TAM271851-63|Y
01|23369|15|1|TAM271851-64|Y
01|23369|16|1|TAM271851-65|Y
01|23369|17|1|TAM271851-66|Y
01|23369|18|1|TAM271851-67|Y
01|23369|19|1|TAM271851-68|Y
01|23369|20|1|TAM271851-61|Y
01|23369|21|1|TAM271851-62|Y
01|23369|22|1|TAM271851-63|Y
01|23369|23|1|TAM271851-64|Y
01|23369|24|1|TAM271851-1|Y
01|23369|25|1|TAM271851-2|Y
01|23369|26|1|TAM271851-3|Y
01|23369|27|1|TAM271851-4|Y
01|23369|28|1|TAM271851-5|Y
01|23369|29|1|TAM271851-6|Y
01|23369|30|1|TAM271851-7|Y
01|23369|31|1|TAM271851-8|Y
01|23369|32|1|TAM271851-9|Y
01|23369|33|1|TAM271851-10|Y
01|23369|34|1|TAM271851-11|Y
01|23369|35|1|TAM271851-12|Y
01|23369|36|1|TAM271851-13|Y
01|23369|37|1|TAM271851-14|Y
01|23369|38|1|TAM271851-15|Y
01|23369|39|1|TAM271851-16|Y
01|23369|40|1|TAM271851-17|Y
01|23369|41|1|TAM271851-18|Y
01|23369|42|1|TAM271851-19|Y
01|23369|43|1|TAM271851-20|Y
01|23369|44|1|TAM271851-21|Y
01|23369|44|2|KM1.1/4-11/16 is a non-stock on and is non returnable|Y
01|23369|45|1|TAM271851-22|Y
01|23369|46|1|TAM271851-23|Y
01|23369|46|2|Collet is a non standard stock and is non returnable.|Y
01|23369|47|1|TAM271851-24|Y
01|23369|48|1|TAM271851-25|Y
01|23369|48|2|Collet is a non standard stock and is non returnable.|Y
01|23369|49|1|TAM271851-26|Y
01|23392|1|1|This item is listed at your NET cost|Y
01|23394|1|1|Repair of customer's 1x HSK100A-C1-115.|Y
01|23394|1|2|Reference RGA# R-45560|Y
01|23396|1|1|This item is listed at your NET cost|Y
01|23435|2|1|Spindle wrench for live tool with ER20 output|Y
01|23435|3|1|ER20 Nut wrench|Y
01|23435|5|1|Spindle wrench for live tool with ER25 output|Y
01|23435|6|1|ER32 Nut wrench|Y
01|23435|8|1|Spindle wrench for live tool with ER32 output|Y
01|23435|9|1|ER32 Nut wrench|Y
01|23507|3|1|NCAT40-SF0125-3.15 1/8 Shrink Fit Holder|Y
01|23507|5|1|NCAT40-SF0312-3.15 3/16 Shrink Fit Holder|Y
01|23507|7|1|NCAT40-SF0500-3.15 1/2 Shrink Fit Holder|Y
01|23507|8|1|NCAT40-SF0750-3.15  3/4 Shrink Fit Holder|Y
01|23517|2|1|H01MA-21 R-1774|Y
01|23517|2|2|21 power chuck for OKUMA VTL|Y
01|23518|2|1|Material= Aluminum|Y
01|23518|3|1|Material= Steel|Y
01|23558|2|1|Delivery is ten business days upon receipt of an order|Y
01|23639|1|1|This item is listed at your NET cost|Y
01|23656|1|1|Tooling Certificate Number: 13687-505-092514|Y
01|23668|1|1|*non-returnable and non-cancellable|Y
01|23668|1|2|*Min 5pc required|Y
01|23669|1|1|*non-returnable and non-cancellable|Y
01|23669|1|2|*Min 5pc required|Y
01|23689|31|1|Pricing includes the Coolant nut|Y
01|23689|40|1|Pricing includes the coolant nut|Y
01|23710|2|1|Spanner wrench for ER32 nut|Y
01|23710|3|1|Spanner wrench for live tool spindle|Y
01|23723|2|1|Spanner Wrench for ER25 Nut|Y
01|23723|3|1|Wrench for Live Tool Spindle|Y
01|23750|3|1|Wrenches at no charge as a courtesy to the customer|Y
01|23849|1|1|Item is considered a non stock standard once a|Y
01|23849|1|2|purchase order is placed it cannot be cancelled or|Y
01|23849|1|3|returned.|Y
01|23860|37|1|4 gage length|Y
01|23860|37|2|Standard taper option TaperPlus recommended.|Y
01|23860|38|1|TaperPlus (Dual Contact Holder)|Y
01|23860|90|1|**Per customer list not possible to hold sizes|Y
01|23860|90|2|larger than 1|Y
01|23860|117|1|Blank discs to be modified by Lyndex-Nikken for exact|Y
01|23860|117|2|size of tool.|Y
01|23860|118|1|Blank discs to by modified by Lyndex-Nikken for exact|Y
01|23860|118|2|size of tool.|Y
01|23875|1|1|Discount reflects core trade-in.|Y
01|23875|1|2|Reference RGA# R-45657.|Y
01|23880|1|1|Discount reflects one-time offer to replace PF-2|Y
01|23880|1|2|inplace of sending in for evaluation.|Y
01|23889|1|1|Reference RGA# R-45607|Y
01|23889|3|1|Drive shaft and drive wheel are broken.|Y
01|23889|3|2|Spindle must be resurfaced.|Y
01|23889|3|3|Bearings seals and o-rings must be replaced.|Y
01|23889|4|1|Net Pricing reflects Core Trade-In pricing.|Y
01|23910|2|1|This item is from L/N slightly used inventory|Y
01|23911|2|1|This item is from L/N slightly used inventory|Y
01|23951|1|1|*** Lyndex Nikken cannot guarantee data relay|Y
01|23951|1|2|on repaired Hitachi Seiki units***|Y
01|23951|3|1|9V Batteries|Y
01|23951|5|1|Unit must be re-wired and recalibrated.|Y
01|23952|3|1|Bearings seals and o-rings must be replaced.|Y
01|23952|3|2|Labor is included.|Y
01|23952|3|3|If we receive a PO by 2:30pm CST 2/19 we can get the|Y
01|23952|3|4|parts in next week 2/25 and ship the repaired tool by|Y
01|23952|3|5|2/27.|Y
01|23968|1|1|Reference RGA# R-45654|Y
01|23968|3|1|CAT40 Spindle and cover are damaged must be replaced.|Y
01|23968|3|2|Bearings seals and o-rings must be replaced.|Y
01|23968|3|3|Labor is included.|Y
01|23971|1|1|Reference RGA# T-45639|Y
01|23988|6|1|Too hold size 7/16|Y
01|24027|18|1|113645 - E-NUTMUTTERKM12-60X2|Y
01|24031|1|1|Demo Unit w/ 2 #40 taper shrink fit pots|Y
01|24031|2|1|New Unit w/ 2 #40 taper shrink fit pots|Y
01|24031|3|1|Demo Unit w/ 10 standard GL #40 taper SF holders & 2 SF|Y
01|24031|3|2|pots|Y
01|24049|7|1|use 020-SPAN|Y
01|24064|1|1|Reference RGA# R-45666|N
01|24071|1|1|Reference RGA# T-45635|Y
01|24097|2|1|Wrench sold separate|Y
01|24097|3|1|Covers the range for 1/8 collet (0.125)|Y
01|24097|12|1|Option in metric to cover 1/2 (0.500)|Y
01|24097|15|1|Option in metric to cover 5/8 (0.625)|Y
01|24097|17|1|Option in metric to cover 3/4 (0.750)|Y
01|24097|18|1|Option in metric to cover 1 (1.000)|Y
01|24101|1|1|Reference RGA# R-45406|Y
01|24101|3|1|Simple repair of customer's SF-MOTHER-BOARD.|Y
01|24101|3|2|This includes: evaluation parts labor testing and|Y
01|24101|3|3|roundtrip freight cost to manufacturer.|Y
01|24104|1|1|B/O - 47pcs = 2 weeks and balance of 3 pcs 6 weeks|Y
01|24109|1|1|Reference RGA# R-45657|Y
01|24109|3|1|Spindle shaft has severe run out must be replaced.|Y
01|24109|3|2|Collet nuts bearings seals & o-rings must be replaced|Y
01|24109|3|3|Labor is included.|Y
01|24114|1|1|Reference RGA# R-45670|Y
01|24114|4|1|Spindle must be resurfaced.|Y
01|24114|4|2|Bearings seals and o-rings must be replaced.|Y
01|24114|4|3|Labor charges are included.|Y
01|24114|6|1|Discount reflects core trade in.|Y
01|24133|5|1|Engineering staff guarantees that this unit will work|Y
01|24133|5|2|for the customer's application and will ATC correctly.|Y
01|24133|5|3|Once they make a positioning block we will visit the|Y
01|24133|5|4|customer and oversee the manufacturing of their 1st|Y
01|24133|5|5|part. Should this not work to their satisfaction we|Y
01|24133|5|6|will take the unit back and not charge for anything.|Y
01|24148|5|1|Spindle bearing surface is damaged must resurface.|N
01|24148|38|1|KB-AX232R232 Tilt Axis acrylic rectangular degree|Y
01|24148|38|2|sight glass.|Y
01|24160|1|1|H100A-SF20-8.86 Per Parlec Drawing|Y
01|24160|1|2|Parlec #A100-SLSB20-225-M157|Y
01|24160|1|3|Delivery 9 weeks upon receipt of signed approval|Y
01|24160|1|4|drawing.|Y
01|24160|2|1|H100A-SF16-10.04 Per Parlec Drawing|Y
01|24160|2|2|Parlec #A100-SLSB16-255-M127|Y
01|24160|2|3|Delivery 9 weeks upon receipt of signed approval|Y
01|24160|2|4|drawing.|Y
01|24182|3|1|Holders will come with SKN-25BJ nuts installed.|Y
01|24182|3|2|These holders are non returnable once modified.|Y
01|24194|1|1|Package price includes Table with motor and cables.|Y
01|24197|19|1|Replacement for 50TG-SPAN|Y
01|24197|20|1|This item at no charge as a courtesy to the customer|Y
01|24216|2|1|3/4|Y
01|24216|3|1|.395|Y
01|24216|4|1|9/16|Y
01|24216|5|1|1|Y
01|24218|1|1|Pricing is for customer to replaced damaged holder|Y
01|24218|1|2|inplace of sending in for repair.|Y
01|24239|1|1|Delivery:12-pcs 6 Weeks Balance 9 to 10 Weeks.|Y
01|24239|2|1|Delivery: 6-pcs 1 to 2 weeks Balance 6 Weeks|Y
01|24241|1|1|Reference RGA# R-45638|Y
01|24256|1|1|Balance in 3 weeks|Y
01|24299|1|1|T13162 2 Boring Bar Holder X 120mm height|Y
01|24327|1|1|Balance in 3 weeks|Y
01|24343|1|1|old Mazak Megaturn VTL VDI 70|Y
01|24343|1|2|Adjustable head|Y
01|24362|1|1|NBT40-C25-90G|Y
01|24373|8|1|Wrench at no charge as a courtesy to the customer|Y
01|24389|2|1|This item has replaced the CAT50-GSK16-105UP|Y
01|24389|3|1|Balance in 2 weeks|Y
01|24400|1|1|Holders include coolant nuts installed.|Y
01|24400|2|1|Holders include coolant nuts installed.|Y
01|24401|3|1|Balance ETA 8 WEEKS|Y
01|24406|4|1|Shrink fit unit + 10 HSK63A standard GL SF holders|Y
01|24414|1|1|1 pc in 2 weeks balance in 5-6 weeks|Y
01|24414|2|1|1 pc in 2 weeks balance in 3-4 weeks|Y
01|24434|1|1|This item is listed at your NET cost|Y
01|24435|3|1|Generic block that your customer can modify to fit|Y
01|24435|3|2|machine.|Y
01|24439|1|1|Reference RGA# R-45692|Y
01|24439|4|1|A76 Cell Batteries|Y
01|24440|1|1|Demo Unit w/ 2 #40 taper shrink fit pots|Y
01|24440|2|1|New Unit w/ 2 #40 taper shrink fit pots|Y
01|24440|3|1|New Unit w/ 10 standard GL #40 taper SF holders & 2 SF|Y
01|24440|3|2|pots|Y
01|24448|1|1|This holder has a CAT50 Dual Contact Taper|Y
01|24448|2|1|This holder has a standard CAT50 taper|Y
01|24455|2|1|Oil Plug for CNC260BFA|Y
01|24466|16|1|This item is considered a special once PO is placed|Y
01|24466|16|2|item CANNOT be cancelled or returned.|Y
01|24466|17|1|Item is considered a special once order is placed|Y
01|24466|17|2|item CANNOT be cancelled or returned.|Y
01|24466|21|1|Item is considered a special. Once item is purchased.|Y
01|24466|21|2|item CANNOT be cancelled or returned.|Y
01|24467|3|1|Balance in 3-4 weeks|Y
01|24468|1|1|Repair of customer's CNC201MA-M sn# 8405|Y
01|24468|1|2|Reference Lyndex-Nikken RGA# T-43444|Y
01|24503|1|1|Reference RGA# T-45686|Y
01|24503|21|1|Spindle is damaged we will need to re-plate and|Y
01|24503|21|2|re-grind.|Y
01|24503|21|3|Delivery will be 2-3 weeks for this modification.|Y
01|24503|22|1|External Motor Cable - Rotary Axis|Y
01|24522|2|1|B/O of 1pc = use coolant version holder as replacement|Y
01|24533|1|1|*6 gage length|Y
01|24533|4|1|*4 gage length|Y
01|24533|6|1|*4 gage length|Y
01|24533|8|1|*5 gage length|Y
01|24542|1|1|This holder has .312 Keys|Y
01|24551|1|1|Reference RGA# T-45668|Y
01|24551|6|1|CN202R024: Gasket|Y
01|24551|25|1|CN202R044 Gasket|Y
01|24574|2|1|Balance in 2 weeks|Y
01|24575|1|1|This collet chuck has a nose/neck diameter of .591|Y
01|24575|5|1|This ER20 collet chuck has a std projection of 2.50|Y
01|24575|10|1|This ER25 collet chuck has a std projection of 2.00|Y
01|24579|1|1|Net Price Each|Y
01|24579|1|2|Non-Cancelable & Non-Returnable|Y
01|24586|2|1|Balance in 2 weeks|Y
01|24602|1|1|Balance of 3 pcs ETA 1-2 weeks|Y
01|24602|4|1|Same as PS-16|Y
01|24602|5|1|Coolant version of PS-16|Y
01|24602|6|1|Same as PS-17|Y
01|24602|7|1|Coolant version of PS-17. B/O 21 pcs ETA 1-2 weeks|Y
01|24623|2|1|Delivery: 13 to 14 weeks|Y
01|24639|1|1|*1-2pc pricing|Y
01|24639|3|1|*3+pc pricing|Y
01|24652|2|1|modified to supply coolant through the sides|Y
01|24667|12|1|21/64|Y
01|24667|13|1|10.5 mm|Y
01|24669|1|1|Please note: Discount is based upon a one time|Y
01|24669|1|2|purchase order with release of 2 tools per month for|Y
01|24669|1|3|3 months.|Y
01|24678|1|1|Please note: Discount is based upon a one time|Y
01|24678|1|2|purchase order with release of 2 tools per month for|Y
01|24678|1|3|3 months.|Y
01|24679|4|1|Balance in 1-2 weeks|Y
01|24679|5|1|Balance in 1-2 weeks|Y
01|24683|1|1|Reference RGA# R-45718|Y
01|24714|1|1|Reference RGA# T-45705|Y
01|24714|16|1|Gaskets|Y
01|24721|1|1|Tooling Certificate Number: 13705TA-513-101314|Y
01|24728|1|1|This item is listed at your NET cost|Y
01|24743|40|1|Balance in < 1 week|Y
01|24744|1|1|2 weeks for delivery. Stock Pending in Japan.|Y
01|24749|1|1|Pre-balanced/ Balanceable to G2.5 @ 30000RPM|Y
01|24749|1|2|No Manual Clamp Holes|Y
01|24749|2|1|Pre-balanced/ Balanceable to G2.5 @ 30000RPM|Y
01|24749|2|2|No Manual Clamp Holes|Y
01|24749|4|1|Pre-balanced to G2.5 @ 20000 RPM|Y
01|24749|4|2|No Manual Clamp Holes|Y
01|24749|5|1|Pre-balanced to G2.5 @ 20000 RPM|Y
01|24749|5|2|No Manual Clamp Holes|Y
01|24753|1|1|RGA# T-45704|Y
01|24763|2|1|BALANCE IN 1-2 WEEKS|Y
01|24782|3|1|Non-Cancelable & Non-Returnable|Y
01|24800|28|1|Used for SK25 and 3/4 Milling Chuck|Y
01|24801|1|1|Reference RGA# T-45724|Y
01|24804|4|1|THIS ITEM IS CURRENTLY ONLY AVAILABLE IN COOLANT PORT|Y
01|24804|4|2|VERSION|Y
01|24812|1|1|New Unit w/ 10 standard GL #40 taper SF holders & 2 SF|Y
01|24812|1|2|pots|Y
01|24812|15|1|Coolant pull stud for CAT40 Mazak|Y
01|24836|3|1|Balance in 1-2 weeks|Y
01|24836|4|1|This item at no charge as a courtesy to the customer|Y
01|24863|1|1|Net Price Each|Y
01|24863|1|2|Non-Cancelable & Non-Returnable|Y
01|24865|1|1|Net Price Each|Y
01|24865|1|2|Non-Cancelable & Non-Returnable|Y
01|24871|1|1|Reference RGA# R-45746|Y
01|24871|3|1|Spindles must be resurfaced.|Y
01|24871|3|2|Mounting hardware and gears are damaged.|Y
01|24871|3|3|Bearings seals and o-rings must be replaced.|Y
01|24871|3|4|Labor is included.|Y
01|24906|1|1|Delivery is ten business days upon receipt of a firm|Y
01|24906|1|2|non-cancellable non-returnable purchase order.|Y
01|24913|1|1|Special|Y
01|24913|10|1|Price quoted in Net.|Y
01|24913|10|2|Special|Y
01|24913|14|1|Special|Y
01|24913|15|1|Special|Y
01|24913|16|1|Special|Y
01|24913|18|1|Special|Y
01|24913|20|1|Special|Y
01|24913|25|1|Special|Y
01|24913|28|1|Item is quoted in NET PRICE|Y
01|24913|28|2|Special|Y
01|24913|30|1|Item is quoted in NET PRICE|Y
01|24913|30|2|Special|Y
01|24914|2|1|Balance ETA 1-2 weeks|Y
01|24935|1|1|38 pcs available in 2 weeks/ will advise for remainder|Y
01|24939|5|1|Price & Delivery Pending|Y
01|24943|1|1|Reference RGA# T-45738|Y
01|24943|13|1|M8X25 Bolts for Brake System.|Y
01|24949|3|1|Spindle Wrench for ER32 Output Live Tools|Y
01|24949|4|1|Nut Wrench for ER32 Output Live Tools|Y
01|24949|8|1|Spindle Wrench for ER20 Output Live Tools|Y
01|24949|9|1|Nut Wrench for ER20 Output Live Tools|Y
01|24958|6|1|Other 3 will be here at Lyndex-Nikken the week of 3/30|Y
01|24958|7|1|Counter offer for the CAT40-C32-105U|Y
01|24958|10|1|Collets for CAT40-C1.1/4SL-105U|Y
01|24968|3|1|Receiving a shipment for more of these on 3/30/15|Y
01|24990|1|1|Demo Unit w/ 10 standard GL #40 taper SF holders & 2 SF|Y
01|24990|1|2|pots|Y
01|25004|10|1|If you send us a PO we will include a free collet rack|Y
01|25024|1|1|Net Price Each|Y
01|25024|1|2|Non-Cancelable & Non-Returnable|Y
01|25055|1|1|BO 5 WEEKS|Y
01|25075|1|1|Reference RGA# R-45745|Y
01|25080|4|1|costumer with 35% discount|Y
01|25086|1|1|**Not available in coolant|Y
01|25086|2|1|**Not available in coolant|Y
01|25086|3|1|**Not available in coolant|Y
01|25086|4|1|**Not available in coolant|Y
01|25086|8|1|**Not available in coolant|Y
01|25086|11|1|*Non-coolant|Y
01|25086|15|1|**Not available in coolant|Y
01|25097|1|1|AVAILABLE MARCH 09|Y
01|25099|1|1|Tooling Certificate Number: 13705TA-558-012715|Y
01|25106|1|1|4.134 Projection|Y
01|25106|2|1|2.756 Projection|Y
01|25106|6|1|4.134 Projection|Y
01|25106|7|1|4.134 Projection|Y
01|25107|12|1|CAT50 TG100 Collet chucks only avaliable in 3.50 gage|Y
01|25107|12|2|length and 5.50 gage length. Quoted 6 with 3.50 gage|Y
01|25145|1|1|Reference RGA# R-45696|Y
01|25145|3|1|Gears are worn must be replaced.|Y
01|25145|3|2|Collet nuts bearings seals & o-rings must also be|Y
01|25145|3|3|replaced.|Y
01|25145|3|4|Labor is included.|Y
01|25149|1|1|Net Price Each|Y
01|25149|1|2|Non-Cancelable & Non-Returnable|Y
01|25149|2|1|Net Price Each|Y
01|25149|2|2|Non-Cancelable & Non-Returnable|Y
01|25149|3|1|Net Price Each|Y
01|25149|3|2|Non-Cancelable & Non-Returnable|Y
01|25152|1|1|Reference RGA# R-45750|Y
01|25152|3|1|Collet nuts must be replaced.|Y
01|25152|3|2|Bearings seals and o-rings must also be replaced.|Y
01|25152|3|3|Labor is included.|Y
01|25177|1|1|Reference RGA# R-45696|Y
01|25177|3|1|Gears are worn must be replaced.|Y
01|25177|3|2|Collet nuts bearings seals & o-rings must also be|Y
01|25177|3|3|replaced.|Y
01|25177|3|4|Labor is included.|Y
01|25182|1|1|Net Price Each|Y
01|25182|1|2|Non-Cancelable & Non-Returnable|Y
01|25183|8|1|N Style Batteries|Y
01|25204|1|1|This item is listed at your NET cost|Y
01|25248|1|1|This item is listed at your NET cost|Y
01|25250|4|1|Spanner Wrench for ER32 nut|Y
01|25250|5|1|Spindle Wrench for ER32 output live tools|Y
01|25250|14|1|Spindle wrench for ER32 live tool for Captain lathe|Y
01|25250|15|1|Spanner wrench for ER32 nut|Y
01|25251|4|1|Spindle wrench for coolant thru ER32 live tools|Y
01|25251|5|1|Spanner Wrench for ER32 nut|Y
01|25251|6|1|Spindle Wrench for ER32 output live tools|Y
01|25251|15|1|Spindle wrench for ER32 live tool for Captain lathe|Y
01|25251|16|1|Spanner wrench for ER32 nut|Y
01|25285|1|1|Shrink fit unit + two #40 taper shrink fit pots|Y
01|25285|2|1|Shrink fit unit two #40 taper shrink fit pots and 10|Y
01|25285|2|2|standard gage length #40 taper shrink fit holders|Y
01|25323|21|1|DT-1-6 Diethreads|Y
01|25329|1|1|3.50 gl|Y
01|25329|2|1|6.00 gl|Y
01|25329|5|1|5.00 gl|Y
01|25329|8|1|No Flats|Y
01|25330|1|1|With coolant nut installed at Lyndex-Nikken. This is|Y
01|25330|1|2|listed at your NET cost|Y
01|25330|7|1|With coolant nut installed at Lyndex-Nikken. This is|Y
01|25330|7|2|listed at your NET cost|Y
01|25337|1|1|3000 Max RPM   1:1 Ratio|Y
01|25345|3|1|Part# Pending External Power Cable|Y
01|25345|4|1|Part# Pending External Feedback cable.|Y
01|25347|1|1|This item is listed at your NET cost|Y
01|25347|2|1|This item is listed at your NET cost|Y
01|25405|1|1|This item is listed at your NET cost|Y
01|25424|1|1|Reference RGA# R-45327.|Y
01|25424|3|1|Spindle must be resurfaced.|Y
01|25424|3|2|Replace damaged location pin and missing mounting|Y
01|25424|3|3|hardware.  Replace all bearings seals and o-rings.|Y
01|25424|3|4|Labor is included.|Y
01|25429|1|1|Reference RGA# R-45327|Y
01|25429|3|1|Replace MI50 system with new MI50 system.|Y
01|25429|3|2|Resurface 1 spindle.|Y
01|25429|3|3|Replace damaged location pin and missing mounting|Y
01|25429|3|4|hardware. Replace all bearings seals and o-rings.|Y
01|25429|3|5|Labor is included.|Y
01|25445|1|1|Balance due early May|Y
01|25458|1|1|1x TCE-SA21L3 Cable|Y
01|25458|1|2|Hydraulic Hose|Y
01|25458|1|3|GR62410005 BD-05 Tool Balancer Swivel Mount|Y
01|25481|2|1|This line is listed at your NET cost|Y
01|25483|5|1|Nose radius .2|Y
01|25483|6|1|Nose radius .4|Y
01|25483|7|1|Nose radius .8|Y
01|25483|14|1|Nose Radius .2|Y
01|25483|15|1|Nose radius .4|Y
01|25483|16|1|Nose radius .8|Y
01|25502|1|1|Reference RGA# R-45805|Y
01|25524|2|1|With Nikken Pull Stud PS-820-1|Y
01|25524|4|1|Holder pricing includes pull stud PS-820-1|Y
01|25526|1|1|Discount reflects additional discount to have the|Y
01|25526|1|2|customer replace the holders instead of sending in for|Y
01|25526|1|3|repair.|Y
01|25526|3|1|Below is minimum repair charge to have 2x C5005-0562|Y
01|25526|3|2|sent in for repair.|Y
01|25526|3|3|Sleeve (2-0562) is broken must be replaced.|Y
01|25550|1|1|Reference RGA# R-45798|Y
01|25563|1|1|This item is listed at your NET cost|Y
01|25563|2|1|This item is listed at your NET cost|Y
01|25568|1|1|Delivery 10 to 12 weeks.|Y
01|25568|1|2|Pricing reflects 2 to 3 holders|Y
01|25568|2|1|Pricing reflects quantity of 4 to 5 holders.|Y
01|25568|4|1|Pricing reflects quantity of 2 to 5 holders.|Y
01|25568|5|1|Pricing reflects quantity of 6 holders.|Y
01|25570|18|1|wrench for CKFN coolant caps|Y
01|25570|20|1|for 8.9mm tool|Y
01|25577|1|1|Original NET price is $879.00|Y
01|25586|1|1|Reference RGA# T-45794|Y
01|25592|1|1|Balance in 7-8 weeks|Y
01|25600|8|1|Collet Promo!|Y
01|25606|1|1|4 pcs stk 18 pcs 3-4 wks & balance of 28 pcs = 8 wks|Y
01|25626|3|1|7/8|Y
01|25626|4|1|1|Y
01|25644|3|1|Custom Block to be machined by Lyndex-Nikken.|Y
01|25646|2|1|BALANCE ETA 4-6 WEEKS|Y
01|25646|9|1|BALANCE IN 1-2 WEEKS|Y
01|25651|2|1|Din modification for CAT40-SZF10-150U|Y
01|25672|1|1|Reference RGA# R-45803|Y
01|25676|2|1|Non-Cancelable & Non-Returnable|Y
01|25676|3|1|Non-Cancelable & Non-Returnable|Y
01|25684|1|1|Reference RGA# R-45832|Y
01|25693|1|1|Serial #:2J0298|Y
01|25719|1|1|Shrink fit unit + 2 HSK63A shrink fit pots|Y
01|25728|3|1|This line is listed at your NET cost|Y
01|25780|1|1|Pricing includes all 3 items below.|Y
01|25786|1|1|This item is listed at your NET cost|Y
01|25786|2|1|This item is listed at your NET cost|Y
01|25793|1|1|Net Price Each|Y
01|25793|1|2|Non-Cancelable & Non-Returnable|Y
01|25815|1|1|This item is listed at your NET cost|Y
01|25829|2|1|Coolant modification listed at your NET cost|Y
01|25853|3|1|External Cable Set up to 10ft|Y
01|25860|4|1|This item is listed at your NET cost|Y
01|25873|1|1|With SKN-16B std nut switched out for coolant SKN-16BJ|Y
01|25873|2|1|With SKN-16B std nut switched out for coolant SKN-16BJ|Y
01|25873|3|1|With SKN-16B std nut switched out for coolant SKN-16BJ|Y
01|25873|4|1|With SKN-25B std nut switched out for coolant SKN-25BJ|Y
01|25873|5|1|With SKN-25B std nut switched out for coolant SKN-25BJ|Y
01|25885|3|1|External Cable set up to 10ft.|Y
01|25891|1|1|Non-Cancelable & Non-Returnable|Y
01|25891|1|2|Net Price Each|Y
01|25898|1|1|Non-Cancelable & Non-Returnable|Y
01|25898|1|2|Net Price Each|Y
01|25937|1|2|Non-Cancelable & Non-Returnable|Y
01|26015|1|1|for F2334.UB.064.Z05.08|Y
01|26015|2|1|for F4042.UB064.Z06.15|Y
01|26015|3|1|for F4042.UB064.Z06.15|Y
01|26025|1|1|Reference RGA# T-45858|Y
01|26025|1|2|5AX-2002FA s/n: 1650|N
01|26030|2|1|Tilting Rotary Table 200MM w/OSP3 Motors(Hydraulic)|Y
01|26030|5|1|Cable set uo to 10Ft|Y
01|26030|8|1|5C Hydr. Chuck & Hydraulic 5C Chuck|Y
01|26045|2|1|Balance ETA 4/16|Y
01|26067|1|1|Non-Cancelable & Non-Returnable|Y
01|26070|1|1|*Net price - 3 left|Y
01|26074|1|2|Non-Cancelable & Non-Returnable|Y
01|26074|2|1|Non-Cancelable & Non-Returnable|Y
01|26076|1|1|Quoted 1 to 9 pieces net price.|Y
01|26076|3|1|Quoted 10+ pieces net price.|Y
01|26076|8|1|Quoted as 1 to 9 pieces net price|Y
01|26076|10|1|Quoted 10 to 14 pieces net price|Y
01|26076|12|1|Quoted 15+ pieces net price|Y
01|26076|16|1|Quoted for 1 to 9 pieces.|Y
01|26076|19|1|Quoted for 10+ holders|Y
01|26076|23|1|Quoted 1-9 pieces at net price|Y
01|26076|25|1|quoted 10-14 pieces at net price|Y
01|26076|27|1|Quoted 15+ pieces at net price|Y
01|26103|1|2|Non-Cancelable & Non-Returnable|Y
01|26128|1|1|Tooling Certificate Number:  8112-512-100814|Y
01|26151|1|1|AC100V On-clamp Alpha4i motor for DMG Mori xxxxx|Y
01|26151|1|2|guys make sure to put right motor this time|N
01|26151|1|3|you guys screwed up lat time.  Hiro|N
01|26153|3|1|This item is listed at your NET cost|Y
01|26167|1|1|Note: Data relay on PF-2 is not guaranted after repair|Y
01|26173|1|1|Non-Cancelable & Non-Returnable|Y
01|26195|4|1|Cable set up to 10ft for OP3|Y
01|26199|1|1|Standard holder 1.75 gl|Y
01|26209|1|1|This item is considered a special. Once a PO is|Y
01|26209|1|2|issued it cannot be cancelled or returned.|Y
01|26209|4|1|Qty Break disc 1-9pcs 25%|Y
01|26209|5|1|Qty Break disc 1-9pcs 25%|Y
01|26242|1|1|Toyoda Stealth 965|Y
01|26242|1|2|Installation to be preformed by State Machine|Y
01|26262|5|1|Blank positioning block with a bushing for customer to|Y
01|26262|5|2|modify.|Y
01|26262|6|1|This item is listed at your NET cost|Y
01|26280|12|1|Balance ETA 3/11|Y
01|26281|1|1|Reference RGA# T-45884|Y
01|26281|1|2|CNCZ180LYA-BR s/n: 7168|N
01|26281|11|1|M5X25L bolts|Y
01|26287|1|1|Reference RGA# T-45884|Y
01|26287|1|2|TAT-105 s/n: 5034|N
01|26297|3|1|AIR charges from Japan|Y
01|26360|1|1|Reference RGA# R-45865|Y
01|26360|3|1|Input shaft is worn must be replaced.|Y
01|26360|3|2|All gears are damaged must be replaced.|Y
01|26360|3|3|All bearings seals and o-rings must be replaced.|Y
01|26360|3|4|Labor charge is included.|Y
01|26369|1|1|Reference RGA# R-45883|Y
01|26369|1|2|2x T32160A05 s/n: A0005 & n/a|N
01|26369|3|1|Spindle shaft locating boss and gears are all damaged|Y
01|26369|3|2|these must be replaced.|Y
01|26369|3|3|Bearings seals and o-rings are worn these must|Y
01|26369|3|4|be replaced.|Y
01|26369|3|5|Labor is included.|Y
01|26369|3|6|Delivery will be 3 weeks from the receipt of a purchase|Y
01|26369|3|7|order.|Y
01|26377|1|1|Balance in 1-2 weeks|Y
01|26380|1|1|Special Discount for Showroom DEMO Table|Y
01|26380|3|1|Installation kit: Drive unit bulkhead & ext cables set|Y
01|26381|1|1|50% OFF DISCOUNT SPECIAL FOR REPAIR UNIT|Y
01|26381|1|2|ONE TIME PRICING|Y
01|26405|3|1|*Qty break 20pc price|Y
01|26417|1|1|Balance in 2 weeks|Y
01|26417|2|1|Balance in 7 weeks|Y
01|26442|1|1|Reference RGA# R-45478|Y
01|26442|1|2|HP-6|N
01|26442|4|1|Unit must be recalibrated.|Y
01|26444|1|1|this is Fanuc alpha 2i motor ac100v for mori|Y
01|26444|1|2|Walden dont screw up|N
01|26444|6|1|No charge for this|Y
01|26444|6|2|hiro had to do this to get order|N
01|26445|1|1|Fanuc Alpha2i motorAC100V ON-clamp for Mori|Y
01|26445|1|2|Walden do not fuck up with this set up|N
01|26445|6|1|Steve I include this free for you|Y
01|26445|6|2|Hiro this is special promotion|N
01|26446|2|1|This item is discontinued|Y
01|26446|3|1|Stock alternative for ZKG12-1/8PU|Y
01|26451|1|1|Reference RGA# R-45903|Y
01|26451|1|2|2T32003 s/n: A0012|N
01|26451|3|1|Spindle is damaged must be replaced.|Y
01|26451|3|2|Gears appear to be damaged and may need to be replaced.|Y
01|26451|3|3|However we cannot say for sure until reassembly.|Y
01|26451|3|4|Should we be able to reuse the original gears pricing|Y
01|26451|3|5|will be $3465.50 NET.|Y
01|26451|3|6|Bearings seals and o-rings must be replaced.|Y
01|26451|3|7|Labor is included.|Y
01|26453|1|1|Reference RGA# T-45899|Y
01|26453|1|2|NST250 s/n: 1188 Mfg: Nov. 2004|N
01|26453|10|1|1/8 Steel balls|Y
01|26456|1|1|T00171|Y
01|26456|4|1|T00169|Y
01|26463|1|1|260MM Face With Hydraulic Clamping w/Alpha4/4000i motor|Y
01|26463|2|1|Installation Includes: Drive unit bulkhed and external|Y
01|26463|2|2|cable sets parmeter changes axis exspansion card if|Y
01|26463|2|3|required service time and travel.|Y
01|26463|3|1|Air/Hydraulic Booster|Y
01|26463|4|1|$1000.00 Free tooling promo|Y
01|26470|1|1|Non-Cancelable & Non-Returnable|Y
01|26482|1|1|Balance in 2 weeks|Y
01|26482|2|1|Balance in 7 weeks|Y
01|26492|8|1|This item is listed at your NET cost|Y
01|26493|9|1|Installation of 5th axis only machine already has 4th|Y
01|26493|9|2|axis that is compatible|Y
01|26505|5|1|Discout reflects non-returnable tooling.|Y
01|26505|5|2|All sales are final.|Y
01|26507|1|1|This item is listed at your NET cost|Y
01|26516|1|1|RFID Chip Hole Only|Y
01|26516|1|2|Etching of UNV# 5031|Y
01|26522|1|1|Reference RGA# T-45933|Y
01|26522|1|2|CNC400HFA-6 s/n: 6052|N
01|26522|14|1|6-Port Rotary Joint(Part# pending)|Y
01|26525|1|1|Reference RGA# T-45933.|Y
01|26525|1|2|CNC400HFA-6 s/n: 6052|N
01|26525|29|1|6-Port Rotary Joint(Part# pending)|Y
01|26531|1|1|Reference RGA# T-45933|Y
01|26531|1|2|CNC400HFA-6 s/n: 1046|N
01|26531|20|1|6-Port Rotary Joint(Part# pending)|Y
01|26540|2|1|Special NMTB50 75TG Collet Chuck|Y
01|26540|2|2|Gage Length  - 7.50|Y
01|26540|2|3|Black Oxide|Y
01|26540|3|1|Special NMTB50 75TG Collet Chuck|Y
01|26540|3|2|Gage Length  - 7.50|Y
01|26540|3|3|Black Oxide|Y
01|26540|4|1|Special NMTB50 75TG Collet Chuck|Y
01|26540|4|2|Gage Length  - 7.50|Y
01|26540|4|3|Black Oxide|Y
01|26551|1|1|2.25 GAGE LENGTH|Y
01|26551|2|1|2.50 GAGE LENGTH|Y
01|26551|3|1|1.10 GAGE LENGTH|Y
01|26551|4|1|3.50 GAGE LENGTH|Y
01|26551|5|1|4.00 GAGE LENGTH|Y
01|26551|6|1|5.00 GAGE LENGTH|Y
01|26551|7|1|6.00 GAGE LENGTH|Y
01|26551|8|1|6.00 GAGE LENGTH|Y
01|26551|9|1|9.00 GAGE LENGTH|Y
01|26560|2|1|Special positioning block machined by Lyndex-Nikken|Y
01|26560|2|2|Application Engineers. This is listed at your NET cost.|Y
01|26565|2|1|Non-Cancelable & Non-Returnable|Y
01|26599|1|1|Reference RGA# R-45908|Y
01|26599|1|2|Repair of FP-2|N
01|26599|4|1|CR2032 Battery|Y
01|26599|5|1|Unit must be recalibrated.|Y
01|26608|3|1|Note all holders are quoted @ Net Price|Y
01|26614|1|1|5.35 Gage length|Y
01|26615|3|1|CNC202YA-M includes Servo Motor|Y
01|26615|3|2|Machine Matsuura 510VG W/J300 Yasnac Control|Y
01|26618|7|1|This item at no charge as a courtesy to the customer|Y
01|26622|2|1|*included with machine|Y
01|26627|1|1|180MM High Speed Table w/Alpha 2/5000i motor|Y
01|26641|1|1|*Quoted as net prices. These units are non-standard|Y
01|26641|1|2|stock and considered specials. Cannot be cancelled or|Y
01|26641|1|3|returned.|Y
01|26641|1|4|100mm (3.93) gage length|Y
01|26641|3|1|2.93 gage length|Y
01|26641|4|1|4.47 gage length|Y
01|26642|1|1|This item is listed at your NET cost|Y
01|26675|7|1|5.50 gage length|Y
01|26678|22|1|Don't offer in taper plus|Y
01|26684|1|1|130MM face plate with 2-Aplha 2/5000i motors|Y
01|26684|2|1|5C threaded nose piece with draw tube.|Y
01|26684|3|1|Hydraulic pancake cylinder for 5C collet closer.|Y
01|26684|4|1|Booster pump for 5C collet closer with hoses & actuator|Y
01|26684|5|1|Daul axis installation kit includes: Dual axis drive|Y
01|26684|5|2|bulkhead cable setsexternal cable sets communication|Y
01|26684|5|3|cables fiber optic cables.|Y
01|26684|6|1|$1500.00 Free Tooling Promotion|Y
01|26712|1|1|Reference RGA# R-45927|Y
01|26712|1|2|OKU-L370MW-DB s/n: AL138|N
01|26712|3|1|Bearings seals o-rings are worn; these must be|Y
01|26712|3|2|replaced.  Collet nuts must also be replaced.|Y
01|26712|3|3|Labor is included.|Y
01|26712|3|4|Delivery will be 2 weeks.|Y
01|26728|3|1|Mimatic 155445|Y
01|26728|4|1|Mimatic 155479|Y
01|26728|6|1|This line is listed at your NET cost|Y
01|26743|1|1|Non-Cancelable & Non-Returnable|Y
01|26765|1|1|Reference RGA# R-45926|Y
01|26765|1|2|CAT50U-AFC1.1/4-230-90 s/n: Azk-08376|Y
01|26765|11|1|MFG completion date: 4/27.  Additional 1 weeks for|Y
01|26765|11|2|shipping.  ETA: May 4 2015.|Y
01|26770|6|1|Average of List $321 and $350 std|Y
01|26779|1|1|300MM face plate with Alpha 4/4000i motor.|Y
01|26779|4|1|$1000.00 Free tooling Promo|Y
01|26787|1|1|Standard nut removed & coolant nut installed|Y
01|26787|1|2|Quoted in NET PRICE|Y
01|26787|2|1|Standard nut removed & coolant nut installed|Y
01|26787|2|2|Quoted in NET PRICE|Y
01|26797|1|1|Non-Cancelable & Non-Returnable|Y
01|26811|1|1|Reference RGA# T-45930|Y
01|26811|1|2|5AX-350FA-R36 s/n: 3519|N
01|26814|1|1|with Fanuc Alfa 2i motor for YCM|Y
01|26814|1|2|JOHN P test quote.|N
01|26829|1|1|NCAT50-C1.1/4-165U - Price for 1 thru 10 pcs being|Y
01|26829|1|2|allowed at 10pc level even if smaller quan is ordered.|Y
01|26831|1|1|Non-Cancelable & Non-Returnable|Y
01|26842|1|1|CNCZ180LSAIII with drive unit and pig tail cable set|Y
01|26842|1|2|for TC32A.|Y
01|26843|1|1|250MM Manual Tilting Rotary table without motor|Y
01|26843|2|1|300MM Manual Titling Rotary table without motor|Y
01|26846|1|1|Expected delivery 4/1 ARO|Y
01|26846|6|1|Installation on Fanuc 0i-Md cotrol to be 4 + 1 capable|Y
01|26846|6|2|Machine must have 4th and 5th axis parameters turned on|Y
01|26846|6|3|Machine Data Sheets required|Y
01|26856|1|1|200MM Face Plate with Alpha iF2/5000 & Aplha iS4/5000|Y
01|26856|2|1|5C Threaded nose piece with special draw tube|Y
01|26856|3|1|Hydraulic pancake cylinder for 5C collet closer|Y
01|26856|4|1|Booster pump with hoses and acuator for 5C closer|Y
01|26856|5|1|Dual axis installation kit: Dual axis drive bulkhead|Y
01|26856|5|2|cable sets external cable sets communications cables|Y
01|26856|5|3|fiber optic cables|Y
01|26861|2|1|Tilting Rotary Table 105mm W/ Sigma 1 Motor Hyd brake|N
01|26873|1|1|Non-Cancelable & Non-Returnable|Y
01|26881|1|1|Non-Cancelable & Non-Returnable|Y
01|26883|21|1|2 PCS IN 1-2 WKS 10 PCS IN 6 WKS BALANCE IN 6-8 WKS|Y
01|26883|22|1|BALANCE ETA 1-2 WEEKS|Y
01|26883|23|1|BALANCE ETA 1-2 WEEKS|Y
01|26883|24|1|BALANCE ETA 1-2 WEEKS|Y
01|26883|25|1|BALANCE ETA 1-2 WEEKS|Y
01|26883|26|1|BALANCE ETA 1-2 WEEKS|Y
01|26901|1|1|Expected delivery 4/1 ARO|Y
01|26901|6|1|Installation on Fanuc 0i-Md cotrol to be 4 + 1 capable|Y
01|26901|6|2|Machine must have 4th and 5th axis parameters turned on|Y
01|26901|6|3|Machine Data Sheets required|Y
01|26904|5|1|Non-Cancelable & Non-Returnable|Y
01|26904|6|1|Non-Cancelable & Non-Returnable|Y
01|26904|7|1|Non-Cancelable & Non-Returnable|Y
01|26904|8|1|Non-Cancelable & Non-Returnable|Y
01|26904|9|1|Non-Cancelable & Non-Returnable|Y
01|26904|10|1|Non-Cancelable & Non-Returnable|Y
01|26904|11|1|Non-Cancelable & Non-Returnable|Y
01|26924|1|1|105MM face plate with motors cables junction box|Y
01|26924|1|2|drive units B master cable sets and sheet metal.|Y
01|26924|2|1|180MM face plate with motors cable set junction box|Y
01|26924|2|2|drive units B master cables and sheet metal.|Y
01|26926|1|1|Reference RGA# T-45925|Y
01|26926|1|2|5AX-130FA-M s/n: 1591|N
01|26943|1|1|130mm face plate with installation kit for Brother S500|Y
01|26943|1|2|or S700|Y
01|26945|1|1|Tooling Certificate Number: 25000-568-021215RT|Y
01|26948|2|1|Non-Standard Stock - Special. Once the order is|Y
01|26948|2|2|placed non-returnable and is non-cancellable.|Y
01|26948|2|3|Delivery is pending.|Y
01|26953|1|1|Special|Y
01|26953|3|1|Special|Y
01|26953|4|1|Special|Y
01|26953|6|1|Special|Y
01|26953|8|1|Special|Y
01|26953|11|1|Special|Y
01|26953|12|1|Special|Y
01|26953|14|1|Special|Y
01|26953|16|1|Special|Y
01|26954|1|1|Reference RGA# R-45775|Y
01|26954|1|2|OKEX-ER32Z s/n: AL127|N
01|26954|3|1|Collet nut must be replaced.|Y
01|26954|3|2|Bearings seals and o-rings must be replaced.|Y
01|26954|3|3|Labor is included.|Y
01|26956|3|1|Item Considered a special. Once order is placed item|Y
01|26956|3|2|cannot be cancelled or returned.|Y
01|26960|1|1|Quoted at an extended discount so as to not send in|Y
01|26960|1|2|the old unit for repair.|Y
01|26982|2|1|$1000.00 Free Tooling Promo|Y
01|26986|1|1|Shrink fit unit + 2 HSK63A SF pots|Y
01|26986|2|1|Shrink fit unit + 2 HSK63A SF pots + 10 standard GL|Y
01|26986|2|2|HSK63A SF holders|Y
01|26993|1|1|105MM High Speed Table with Alpha 2/5000i Motor.|Y
01|27009|1|1|Repair of customer's OKL3-ER32Z s/n: A1452.|N
01|27009|1|2|Reference RGA# R-45939|Y
01|27009|3|1|Bearings seals and o-rings must be replaced.|Y
01|27009|3|2|Collet nut must also be replaced.|Y
01|27009|3|3|Labor is included.|Y
01|27014|1|1|non-coolant|Y
01|27014|2|1|*Coolant Through|Y
01|27029|1|1|This item at no charge as a courtesy to the customer.|Y
01|27053|1|1|*10-24pc qty break|Y
01|27053|2|1|*25pc+ qty break|Y
01|27053|2|2|HSK50E ER11 Collet Chuck w/ 110mm gage length|Y
01|27053|2|3|Pre-balanced to G2.5 @ 30000 RPM|Y
01|27053|2|4|No Manual Clamp Holes|Y
01|27053|4|1|*10-24pc qty break|Y
01|27053|5|1|*25pc+ qty break|Y
01|27053|5|2|HSK50E 3/8 Shrink Fit Holder w/ 3.15 gage length|Y
01|27053|5|3|Pre-Balanced and Balanceable tapped holes|Y
01|27053|5|4|No Manual Clamp Holes|Y
01|27053|12|1|*10-24pc qty break|Y
01|27053|13|1|*25pc+ qty break|Y
01|27053|13|2|HSK50E 1/2 Shrink Fit Holder w/ 3.15 gage length|Y
01|27053|13|3|Pre-Balanced and Balanceable tapped holes|Y
01|27053|13|4|No Manual Clamp Holes|Y
01|27054|3|1|Delivery Pending. one tables stock checking for control|Y
01|27054|3|2|Indexer position only thru M function required|Y
01|27054|3|3|To be used on MillTap 700 machine.|Y
01|27055|1|1|5AX-2MT-105-120BAYABR-QT-1TO one table only for TC32BN|Y
01|27055|1|2|installation kit: drive units cables and sheet metal|Y
01|27055|1|3|divider and B master cable set.|Y
01|27061|1|1|88 pcs in 2-3 days balance in 2 weeks|Y
01|27067|2|1|This line is listed at your NET cost|Y
01|27095|1|1|Modi from CAT40-C1-85U (2 holes)|Y
01|27095|1|2|Non-Cancelable & Non-Returnable|Y
01|27095|1|3|B/O 2 Weeks|Y
01|27109|1|1|1 additional pc in 1-2 wks balance in 3-4 wks|Y
01|27110|1|1|BALANCE IN 1-2 WEEKS|Y
01|27124|1|1|5AX-2002 s/n: 1532|N
01|27124|1|2|Reference RGA# T-45970|Y
01|27151|1|1|Non-Cancelable & Non-Returnable|Y
01|27171|2|1|UNV# 199|Y
01|27171|4|1|UNV #338|Y
01|27171|6|1|UNV #76|Y
01|27227|1|1|200MM Face Plate with Alpha Motors|Y
01|27227|1|2|Installation 4 + 1 Capabilities|Y
01|27227|1|3|Installation includes drives cable labor|Y
01|27227|1|4|Machine Data sheets required|Y
01|27227|1|5|Controls need 4th and 5th axis parameters turned on|Y
01|27228|1|1|350 MM Faceplate|Y
01|27228|1|2|Installation includes drive cables labor|Y
01|27228|1|3|Installation 4 + 1 capabilities|Y
01|27228|1|4|Machine Data sheets required|Y
01|27228|1|5|Control must have 4th and 5th axis turned on|Y
01|27228|1|6|Table to fit along X axis only|Y
01|27229|1|1|350 MM Faceplate|Y
01|27229|1|2|Installation includes drive cables labor|Y
01|27229|1|3|Installation 4 + 1 capabilities|Y
01|27229|1|4|Machine Data sheets required|Y
01|27229|1|5|Control must have 4th and 5th axis turned on|Y
01|27229|1|6|Table to fit along X axis only|Y
01|27235|1|1|CNC400HMA-APC s/n: 5598|N
01|27235|1|2|Reference RGA# T-45947|Y
01|27240|1|1|Atlas front mount self contained dead lenght closer|Y
01|27240|1|2|with acuator and air lines.|Y
01|27240|2|1|5C collet closer adapter plate|Y
01|27243|1|1|05.1311.7141.505 (MZMP47-ER32Z) s/n: 5763 03|N
01|27243|1|2|Reference RGA# R-45975|Y
01|27243|3|1|Spindles must be resurfaced.|Y
01|27243|3|2|Bearings seals and o-rings must be replaced.|Y
01|27243|3|3|Labor is included.|Y
01|27270|1|1|800MM face plate with Fanuc Alpha iS30/4000 motor|Y
01|27270|1|2|with special toe clamp area for vertical use rotating|Y
01|27270|1|3|4500lbs part with out ward support|Y
01|27270|4|1|800MM face plate with Alpha controller for M-code use|Y
01|27270|4|2|with special toe clamp area for vertical use rotating|Y
01|27270|4|3|4500lbs part with out ward support.|Y
01|27270|6|1|hydraulic unit with solenoid and hoses|Y
01|27279|1|1|Reference RGA# R-45943|Y
01|27279|1|2|C4005-0562|Y
01|27283|1|1|105MM face plate with Nikken AA21 control|Y
01|27283|1|2|Includeds controllerexternal cables and M-Code cable|Y
01|27283|2|1|Special Rust Proof Treatment on Spindle for EDM use|Y
01|27310|1|1|400 MM ROTARY TABLE|Y
01|27310|4|1|CABLE SET SUPPLIED AT NO CHARGE|Y
01|27310|5|1|INSTALLATION INCLUDES DRIVES CABLE LABOR|Y
01|27310|5|2|MACHINE DATA SHEETS NEEDED|Y
01|27310|5|3|OKUMA NEEDS TO CONFIRM 4TH AXIS SOFTWARE IS CHANGED|Y
01|27310|5|4|FANUC CONTROL MODEL NEED TO BE CONFIRMED|Y
01|27310|8|1|CAT50 STARTER TOOLING PACKAGE AT NO CHARGE|Y
01|27313|1|1|This will need the adapter plate switched out for|Y
01|27313|1|2|an adapter plate to fit the CNC260.|Y
01|27314|4|1|60mm Gage|Y
01|27323|1|1|130MM face plate with two Nikken AA controllers|Y
01|27323|1|2|M-code connection cables included|Y
01|27323|2|1|RS232 cable for D-Print connection included|Y
01|27338|1|1|250mm 200RPM Direct Drive table for S500 S700|Y
01|27339|1|1|Note that current availability is referenced and|Y
01|27339|1|2|is subject to change based upon prior sale.|Y
01|27339|1|3|Non-Cancelable & Non-Returnable|Y
01|27355|6|1|*old generation - cannot be returned|Y
01|27355|7|1|*old generation - cannot be returned|Y
01|27355|8|1|*old generation - cannot be returned|Y
01|27357|3|1|This item at no charge as a courtesy to the customer|Y
01|27357|4|1|This item at no charge as a courtesy to the customer|Y
01|27366|1|1|BALANACE ETA 3 WEEKS|Y
01|27366|2|1|BALANCE IN 5 WEEKS|Y
01|27394|1|1|300MM table with backhand mounted Fanuc Alpha 4/4000i|Y
01|27394|2|1|Installation includes: Drive unit bulkhead external|Y
01|27394|2|2|fiber optic communications cables parameter changes|Y
01|27394|2|3|service time and travel.|Y
01|27394|3|1|$1000.00 Free Tooling Promo|Y
01|27403|2|1|This item is listed at your NET cost|Y
01|27406|2|1|Wrench for C5007-1000-3.50|Y
01|27406|21|1|*offered 90mm projection length|Y
01|27420|1|1|Reference RGA# R-45973|Y
01|27420|1|2|OKE4-ER40Z s/n: AL015 & AL017|N
01|27420|3|1|Collet nuts must be replaced.|Y
01|27420|3|2|Bearings seals and o-rings must be replaced.|Y
01|27420|3|3|Labor is included.|Y
01|27429|3|1|This item at no charge as a courtesy to the customer|Y
01|27453|1|1|Reference RGA# R-45671|Y
01|27453|1|2|SF-MOTHER-BOARD s/n: 34/10-070|N
01|27453|3|1|Resistor damaged must be replaced. Hardware and|Y
01|27453|3|2|software will be upgraded.  Labor is included.|Y
01|27453|3|3|Cost includes shipping to France from Lyndex-Nikken and|Y
01|27453|3|4|from France to Lyndex-Nikken.|Y
01|27461|4|1|Option for vise set up|Y
01|27461|6|1|Option for rotary table set up|Y
01|27461|8|1|Lyndex-Nikken to design and make stop block for DV5100|Y
01|27480|1|1|180MM High Speed Table with Fanuc Alpha iF2/5000|Y
01|27480|4|1|Installation: Drive unit external cables short bar|Y
01|27480|4|2|fiber optic cable communications cable service time|Y
01|27480|4|3|and travel.|Y
01|27480|5|1|$1000.00 Free Tooling Promo|Y
01|27487|1|2|Non-Cancelable & Non-Returnable|Y
01|27582|1|1|This item is considered Special once a purchase order|Y
01|27582|1|2|is placed it cannot be cancelled or returned. Please|Y
01|27582|1|3|note this item is quoted with net pricing.|Y
01|27582|2|1|Item is considered Special once a purchase order is|Y
01|27582|2|2|placed it cannot be cancelled or returned.|Y
01|27584|2|1|Net Price Each|Y
01|27584|2|2|Non-Cancelable & Non-Returnable|Y
01|27591|1|1|Discount is based upon 1 to 9 pieces|Y
01|27591|2|1|Discount is based upon 1 to 9 pieces|Y
01|27591|3|1|Discount is based upon 1 to 9 pieces|Y
01|27591|6|1|Discount reflects purchase of 10 pcs or more.|Y
01|27591|7|1|Discount reflects purchase of 10 pcs or more.|Y
01|27591|8|1|Discount reflects purchase of 10 pcs or more.|Y
01|27598|6|1|Slotted for Coolant thru|Y
01|27598|7|1|Slotting of Arbor screw|Y
01|27613|1|1|Non-Cancelable & Non-Returnable|Y
01|27614|3|1|This line at no charge as a courtesy to the customer|Y
01|27618|1|1|Repair Quote for OKL3-ER32X|Y
01|27618|1|2|Price reflects replacing bearings and Seals|Y
01|27618|1|3|This Price would be the Maximum cost for bearings/seals|Y
01|27633|3|1|With 4.05 through hole.|Y
01|27639|1|1|Has DIN holes for coolant thru flange. Will not|Y
01|27639|1|2|work with thru-spindle coolant but will work if|Y
01|27639|1|3|not using any coolant.|Y
01|27696|1|1|w/ Makino Pins|Y
01|27701|1|1|*Substitution for CAT50-SK16-105UP|Y
01|27701|1|2|DIN- coolant through flange unit|Y
01|27701|1|3|L&N will plug DIN holes if needed|Y
01|27701|1|4|*old generation- once purchased cannot be returned|Y
01|27701|1|5|*quoted net price|Y
01|27701|2|1|*Substitution for H80F-SF0250-3.00B|Y
01|27701|2|2|*old generation- once purchased cannot be returned|Y
01|27701|2|3|*quoted net price|Y
01|27716|1|1|Non-Cancelable & Non-Returnable|Y
01|27723|1|1|Reference RGA# T-45945|Y
01|27723|1|2|CNC180-2W-250 s/n: 14702T|N
01|27743|1|1|Reference RGA# T-46040|Y
01|27743|1|2|CNC180 s/n: 7441|N
01|27743|16|1|Expedite fee for RUSH repair of customer's CNC180|Y
01|27743|16|2|s/n: 7441.|Y
01|27755|1|1|Non-Cancelable & Non-Returnable|Y
01|27783|5|1|This line at no charge as a courtesy to the customer|Y
01|27795|1|1|Non-Cancelable & Non-Returnable|Y
01|27796|1|1|Non-Cancelable & Non-Returnable|Y
01|27799|1|1|Non-Cancelable & Non-Returnable|Y
01|27800|1|1|Non-Cancelable & Non-Returnable|Y
01|27823|1|1|Non-Cancelable & Non-Returnable|Y
01|27844|1|1|BALANCE IN 8 WEEKS|Y
01|27844|2|1|BALANCE IN 5 WEEKS|Y
01|27876|2|1|With trade-in of old unit|Y
01|27877|10|1|Price indicates holder with standard nut removed.|Y
01|27877|11|1|Hex nuts will be installed when order is placed.|Y
01|27880|1|1|Price Indicates holder with standard nut removed|Y
01|27880|2|1|SKN-16BJ will be installed when order is placed|Y
01|27884|1|1|Current stock allows up to 5pcs to be shipped within|Y
01|27884|1|2|3 business days. 12pcs more available at factory and|Y
01|27884|1|3|could ship aprox 10 bus days after receipt of PO.|Y
01|27898|1|1|Reference RGA# T-45954|Y
01|27898|1|2|5AX-250 s/n: 1056|Y
01|27898|15|1|EDM cut of Worm Screw|Y
01|27898|17|1|Parts at 100% discount will be covered under warranty|Y
01|27898|17|2|due to design flaw of Rotary Axis.|Y
01|27916|1|1|200MM table with Haas Sigma 5 motor and cable set|Y
01|27916|3|1|130MM tilt rotary table with Sigma5 motors & cable sets|Y
01|27916|4|1|200MM High Speed w/Sigma 5 motor and cables set|Y
01|27916|5|1|Installation: Set up table and add parameters|Y
01|27916|6|1|$1000.00 Free Tooling Promo|Y
01|27919|1|1|Reference RGA# T-46008|Y
01|27919|1|2|5AX-201 s/n: 4189|N
01|27959|1|1|Reference RGA# T-46027|Y
01|27959|1|2|CNC320V s/n: 2455|N
01|27962|1|1|installed with coolant SKN-16BJ nut|Y
01|27962|1|2|*NET PRICE|Y
01|27962|2|1|**installed at Lyndex-Nikken on CAT40-SK16-90U|Y
01|27962|11|1|installed with coolant SKN-10BJ nut|Y
01|27962|11|2|*NET PRICE|Y
01|27962|12|1|**installed at Lyndex-Nikken on CAT40-SK10-90U|Y
01|27962|25|1|installed with coolant SKN-25BJ nut|Y
01|27962|25|2|*NET PRICE|Y
01|27962|26|1|**installed at Lyndex-Nikken on CAT40-SK25-90U|Y
01|27963|1|1|This line is listed at your NET cost|Y
01|27980|2|1|Non-Cancelable & Non-Returnable|Y
01|27993|3|1|Non-Cancelable & Non-Returnable|Y
01|27997|2|1|*1wk|Y
01|28002|5|1|BALANCE ETA 3/31|Y
01|28033|1|1|Non-Cancelable & Non-Returnable|Y
01|28047|1|1|This line is listed at your NET cost|Y
01|28072|1|1|105MM High Speed Table w/Siemens 1FK7042-5AF71-1FG0|Y
01|28072|2|1|105MM High Speed Table without Siemens motor|Y
01|28074|1|1|Non-Cancelable & Non-Returnable|Y
01|28082|2|1|Substitution for std BT30-SF0125-3.15|Y
01|28082|2|2|Units are prebalanced and balanceable (tapped holes)|Y
01|28086|1|1|Non-Cancelable & Non-Returnable|Y
01|28099|1|1|Shrink fit package includes SF machine 10 CAT40|Y
01|28099|1|2|standard GL holders and 2 CAT40 SF pots|Y
01|28117|1|1|7.5ft Rotary Encoder cable for 5AX-200FA-M|Y
01|28117|1|2|For Bridgeport machine.|Y
01|28118|2|1|3-place combination block|Y
01|28118|2|2|at 3 o-clock 45-degrees up 45-degrees down|Y
01|28131|1|1|Reference RGA# T-45971|Y
01|28131|1|2|5AX-2002 s/n: 1607|Y
01|28132|2|1|Net Price Each|Y
01|28132|2|2|Non-Cancelable & Non-Returnable|Y
01|28132|3|1|Net Price Each|Y
01|28132|3|2|Non-Cancelable & Non-Returnable|Y
01|28132|4|1|Net Price Each|Y
01|28132|4|2|Non-Cancelable & Non-Returnable|Y
01|28132|5|1|Net Price Each|Y
01|28132|5|2|Non-Cancelable & Non-Returnable|Y
01|28132|8|1|Net Price Each|Y
01|28132|8|2|Non-Cancelable & Non-Returnable|Y
01|28132|9|1|Net Price Each|Y
01|28132|9|2|Non-Cancelable & Non-Returnable|Y
01|28132|10|1|Net Price Each|Y
01|28132|10|2|Non-Cancelable & Non-Returnable|Y
01|28132|12|1|Net Price Each|Y
01|28132|12|2|Non-Cancelable & Non-Returnable|Y
01|28132|13|1|Net Price Each|Y
01|28132|13|2|Non-Cancelable & Non-Returnable|Y
01|28132|14|1|Net Price Each|Y
01|28132|14|2|Non-Cancelable & Non-Returnable|Y
01|28146|8|1|Non-Cancelable & Non-Returnable|Y
01|28165|2|1|*2pc 40-taper pots included with machine|Y
01|28168|1|1|Reference RGA# R-46055|Y
01|28168|1|2|CAT40-C3/4-85U|N
01|28168|3|1|Units needs to be cleaned and re-greased.|Y
01|28170|1|1|Non-Cancelable & Non-Returnable|Y
01|28171|1|1|ref. Alps OKA00-20000|Y
01|28201|1|1|Stock 1 piece. Delivery on balance 6 weeks.|Y
01|28201|2|1|Gage Length is 6|Y
01|28208|1|1|Non-Cancelable & Non-Returnable|Y
01|28214|3|1|Cable Set up to 10ft|Y
01|28215|4|1|CABLE SET UP TO 10FT|Y
01|28215|9|1|Installatio & Interface for 31i control (2 axes)|Y
01|28216|4|1|CABLE SET UPTO 10FT|Y
01|28230|1|1|Non-Cancelable & Non-Returnable|Y
01|28232|1|1|Reference RGA# R-46023|Y
01|28232|1|2|4x MZQT47-ER25Z-MS s/n: 0057 13 0954 14 0416 13 &|N
01|28232|1|3|0373 12.|N
01|28232|3|1|Repair of s/n: 0373 12: Spindles must be resurfaced.|Y
01|28232|3|2|Bearings seals and o-rings are worn and must be|Y
01|28232|3|3|replaced. Labor is included.|Y
01|28232|4|1|Cost to repair s/n: 0057 13 0954 14 & 0416 13 exceed|Y
01|28232|4|2|60% of list price.  Due to the high cost of this repair|Y
01|28232|4|3|we are offering the core trade-in discount of 30% off|Y
01|28232|4|4|List price for 3 new units instead of repairing.|Y
01|28242|1|1|Non-Cancelable & Non-Returnable|Y
01|28253|3|1|SPECIAL ITEM|Y
01|28253|4|1|SPECIAL ITEM|Y
01|28286|1|1|Reference RGA# R-46094|Y
01|28286|1|2|1x OKL3-ER32X s/n: AL565|N
01|28286|3|1|Bearings seals and o-rings are worn these must be|Y
01|28286|3|2|replaced.  Collet nut must also be replaced.|Y
01|28286|3|3|Labor is included.|Y
01|28297|1|1|Reference RGA# R-46066|Y
01|28297|1|2|OKL3-ER32Z-OFMS s/n: AL0041|N
01|28297|3|1|Collet nuts bearins seals and o-rings must be|Y
01|28297|3|2|replaced. Labor is included.|Y
01|28308|28|1|Fee is for expedited repair of 5AX-2MT-105-120|Y
01|28308|28|2|s/n: 8138.  Guarantees repair will be completed and|Y
01|28308|28|3|ready to ship in 3 business days.|Y
01|28314|1|1|Net Price Each|Y
01|28314|1|2|Non-Cancelable & Non-Returnable|Y
01|28314|2|1|Net Price Each|Y
01|28314|2|2|Non-Cancelable & Non-Returnable|Y
01|28314|4|1|Net Price Each|Y
01|28314|4|2|Non-Cancelable & Non-Returnable|Y
01|28317|1|1|Net Price Each|Y
01|28317|1|2|Non-Cancelable & Non-Returnable|Y
01|28317|2|1|Net Price Each|Y
01|28317|2|2|Non-Cancelable & Non-Returnable|Y
01|28324|4|1|500PSI Hydraulic Pancake Cylinder for 5C Closer|Y
01|28324|5|1|Air/Hyd tank with hoses for 5C collet closer|Y
01|28336|1|1|Reference SO#657832|Y
01|28336|1|2|Swap nuts.|Y
01|28336|1|3|Convert to CAT40-SK16-90U w/SKN-16BJ Coolant nuts.|Y
01|28336|2|1|-7 SKN-16BJ +7 SKN-16B|Y
01|28336|2|2|Install onto holders above.|Y
01|28336|3|1|-9 SKN-10BJ +9 SKN-10B|Y
01|28336|3|2|Install onto holders above.|Y
01|28336|4|1|-1 SKN-25BJ +1 SKN-25B|Y
01|28336|4|2|Install onto holders above.|Y
01|28336|5|1|Reference SO#657832|Y
01|28336|5|2|Swap nuts.|Y
01|28336|5|3|Convert to CAT40-SK10-90U w/SKN-10BJ Coolant nuts.|Y
01|28336|6|1|Reference SO#657832|Y
01|28336|6|2|Swap nuts.|Y
01|28336|6|3|Convert to CAT40-SK25-90U w/SKN-25BJ Coolant nuts.|Y
01|28340|1|1|Customer must have balance machine in order to use the|Y
01|28340|1|2|balancable feature|Y
01|28343|1|1|Reference RGA# R-46069|Y
01|28343|3|1|Repair of 1x OKL3-ER32X s/n: AL0148|Y
01|28343|3|2|Gears are damaged these must be replaced. Collet nut|Y
01|28343|3|3|bearings seals and o-rings are worn these must be|Y
01|28343|3|4|replaced.  Labor is included.|Y
01|28343|4|1|Repair of 1x OK101-79000 s/n: AL0001.|Y
01|28343|4|2|Bearings seals and o-rings are worn these must be|Y
01|28343|4|3|replaced.  Labor is included.|Y
01|28343|5|1|Repair of 2x OK101-79000 s/n: AL0002 & AL0003.|Y
01|28343|5|2|Clutches must be replaced.  Bearings seals and o-rings|Y
01|28343|5|3|are worn these must also be replaced.|Y
01|28343|5|4|Labor is included.|Y
01|28355|1|1|Reference SO#657480|Y
01|28355|1|2|Convert to C5016-1000-6.00DIN|Y
01|28355|1|3|*DIN Modify re-etch re-label.|Y
01|28355|2|1|2x C5016-1000-6.00 requires DIN modification.|Y
01|28355|3|1|Reference SO#657480|Y
01|28355|3|2|Convert to C5006-25-4.00DIN|Y
01|28355|3|3|*DIN Modify re-etch re-label.|Y
01|28355|4|1|1x C5006-25-4.00 requires DIN modification.|Y
01|28376|1|1|MCAT40-GSK10C-90UP-RP  3-lock CAT40 Hi-Speed Rust Proof|Y
01|28376|2|1|MCAT40-GSK10C-90UP-RP 3-lock CAT40 Hi-Speed Rust Proof|Y
01|28388|2|1|Net Price Each|Y
01|28388|2|2|Non-Cancelable & Non-Returnable|Y
01|28402|7|1|Special Discount as a Substitution|Y
01|28427|1|1|Discount reflects Core Trade-In.|Y
01|28427|1|2|Reference RGA# R-46066|Y
01|28432|7|1|Includes Fixing Handle|Y
01|28441|3|1|Slotting arbor screw|Y
01|28447|1|1|Reference RGA# R-46028|Y
01|28447|1|2|OKL3-ER32Z-OFM S/N AL0047|N
01|28447|3|1|Replace clutch collet nut bearings seals and o-rings|Y
01|28447|3|2|Labor is included.|Y
01|28473|1|1|Reference SO#658154|Y
01|28473|1|2|Convert to NCAT40-SK10C-90U|Y
01|28473|1|3|*Swap nuts re-etch re-label.|Y
01|28473|2|1|Install onto holders above.|Y
01|28473|2|2|-2 SKN-10B +2 SKN-10B(GH)|Y
01|28473|3|1|Convert to NCAT40-SK16C-90U|Y
01|28473|3|2|*Swap nuts balance re-etch re-label.|Y
01|28473|4|1|Install onto holders above.|Y
01|28473|4|2|-1 SKN-16B +1 SKN-16B(GH)|Y
01|28494|1|1|Reference RGA# R-46054|Y
01|28494|1|2|5AX-130 s/n: 3056|N
01|28503|5|1|Promotional - Spring|Y
01|28546|2|1|BALANCE IN 12-14 WEEKS|Y
01|28548|1|1|Reference RGA# T-46033|Y
01|28548|1|2|5AX-130WA21 s/n: 1919H|N
01|28562|40|1|BALANCE IN 1-2 WEEKS|Y
01|28616|1|1|Non-Cancelable & Non-Returnable|Y
01|28616|3|1|Non-Cancelable & Non-Returnable|Y
01|28616|4|1|Non-Cancelable & Non-Returnable|Y
01|28616|5|1|Non-Cancelable & Non-Returnable|Y
01|28616|6|1|Non-Cancelable & Non-Returnable|Y
01|28616|7|1|Non-Cancelable & Non-Returnable|Y
01|28616|8|1|Non-Cancelable & Non-Returnable|Y
01|28616|9|1|Non-Cancelable & Non-Returnable|Y
01|28616|11|1|Non-Cancelable & Non-Returnable|Y
01|28616|13|1|Non-Cancelable & Non-Returnable|Y
01|28616|14|1|Non-Cancelable & Non-Returnable|Y
01|28616|15|1|Non-Cancelable & Non-Returnable|Y
01|28616|17|1|Non-Cancelable & Non-Returnable|Y
01|28616|19|1|Non-Cancelable & Non-Returnable|Y
01|28616|21|1|Non-Cancelable & Non-Returnable|Y
01|28616|23|1|Non-Cancelable & Non-Returnable|Y
01|28616|24|1|Non-Cancelable & Non-Returnable|Y
01|28619|7|1|Internal Power Wireharness|Y
01|28630|1|1|This item is listed at your NET cost|Y
01|28644|1|1|Reference RGA# R-46149|Y
01|28644|1|2|1x PF-2|N
01|28644|4|1|PF-2 must be re-calibrated.|Y
01|28645|1|1|Net price each|Y
01|28645|1|2|No Returnable No Cancellable|Y
01|28645|2|1|Net price each|Y
01|28645|2|2|No Returnable No Cancellable|Y
01|28645|3|1|Net price each|Y
01|28645|3|2|No Returnable No Cancellable|Y
01|28645|4|1|Net price each|Y
01|28645|4|2|No Returnable No Cancellable|Y
01|28648|1|1|NSVZ180LAA21 with left hand mounted motor.|Y
01|28648|1|2|Package includes: Nikken table motor control pendant|Y
01|28648|1|3|power cable M-code cable.|Y
01|28666|2|1|This item is listed at your NET cost|Y
01|28672|1|1|Includes:|Y
01|28672|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28672|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28672|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28672|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28672|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28672|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28672|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28672|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28672|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28672|3|1|Includes:|Y
01|28672|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28672|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28672|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28672|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28672|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28672|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28672|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28672|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28672|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28676|1|1|Non-Cancelable & Non-Returnable|Y
01|28681|10|1|for Zero Fit 20mm milling chuck|Y
01|28688|1|1|Includes:|Y
01|28688|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28688|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28688|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28688|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28688|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28688|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28688|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28688|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28688|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28688|3|1|Includes:|Y
01|28688|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28688|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28688|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28688|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28688|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28688|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28688|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28688|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28688|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28693|2|1|Balance in 1-2 weeks|Y
01|28700|1|1|Includes:|Y
01|28700|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28700|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28700|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28700|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28700|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28700|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28700|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28700|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28700|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28700|3|1|Includes:|Y
01|28700|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28700|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28700|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28700|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28700|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28700|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28700|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28700|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28700|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28703|1|1|Includes:|Y
01|28703|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28703|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28703|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28703|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28703|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28703|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28703|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28703|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28703|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28703|3|1|Includes:|Y
01|28703|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28703|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28703|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28703|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28703|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28703|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28703|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28703|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28703|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28704|1|1|Non-Cancelable & Non-Returnable|Y
01|28708|1|1|Includes:|Y
01|28708|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28708|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28708|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28708|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28708|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28708|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28708|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28708|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28708|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28708|3|1|Includes:|Y
01|28708|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28708|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28708|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28708|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28708|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28708|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28708|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28708|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28708|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28709|1|1|Includes:|Y
01|28709|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28709|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28709|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28709|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28709|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28709|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28709|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28709|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28709|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28709|3|1|Includes:|Y
01|28709|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28709|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28709|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28709|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28709|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28709|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28709|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28709|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28709|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28719|1|1|*Non-coolant|Y
01|28719|2|1|*Coolant through|Y
01|28721|1|1|Includes:|Y
01|28721|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28721|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28721|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28721|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28721|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28721|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28721|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28721|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28721|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28721|3|1|Includes:|Y
01|28721|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28721|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28721|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28721|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28721|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28721|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28721|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28721|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28721|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28723|1|1|Includes:|Y
01|28723|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28723|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28723|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28723|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28723|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28723|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28723|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28723|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28723|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28723|3|1|Includes:|Y
01|28723|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28723|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28723|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28723|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28723|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28723|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28723|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28723|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28723|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28725|1|1|Includes:|Y
01|28725|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28725|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28725|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28725|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28725|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28725|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28725|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28725|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28725|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28725|3|1|Includes:|Y
01|28725|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28725|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28725|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28725|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28725|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28725|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28725|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28725|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28725|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28726|1|1|Includes:|Y
01|28726|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28726|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28726|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28726|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28726|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28726|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28726|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28726|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28726|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28726|3|1|Includes:|Y
01|28726|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28726|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28726|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28726|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28726|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28726|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28726|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28726|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28726|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28727|1|1|Includes:|Y
01|28727|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28727|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28727|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28727|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28727|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28727|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28727|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28727|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28727|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28727|3|1|Includes:|Y
01|28727|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28727|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28727|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28727|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28727|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28727|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28727|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28727|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28727|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28728|1|1|Includes:|Y
01|28728|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28728|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28728|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28728|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28728|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28728|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28728|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28728|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28728|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28728|3|1|Includes:|Y
01|28728|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28728|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28728|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28728|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28728|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28728|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28728|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28728|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28728|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28729|1|1|Includes:|Y
01|28729|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28729|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28729|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28729|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28729|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28729|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28729|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28729|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28729|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28729|3|1|Includes:|Y
01|28729|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28729|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28729|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28729|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28729|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28729|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28729|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28729|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28729|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28730|1|1|Includes:|Y
01|28730|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28730|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28730|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28730|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28730|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28730|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28730|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28730|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28730|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28730|3|1|Includes:|Y
01|28730|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28730|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28730|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28730|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28730|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28730|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28730|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28730|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28730|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28731|1|1|Includes:|Y
01|28731|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28731|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28731|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28731|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28731|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28731|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28731|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28731|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28731|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28731|3|1|Includes:|Y
01|28731|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28731|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28731|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28731|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28731|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28731|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28731|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28731|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28731|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28733|1|1|Includes:|Y
01|28733|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28733|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28733|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28733|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28733|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28733|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28733|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28733|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28733|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28733|3|1|Includes:|Y
01|28733|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28733|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28733|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28733|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28733|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28733|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28733|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28733|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28733|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28734|1|1|Includes:|Y
01|28734|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28734|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28734|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28734|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28734|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28734|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28734|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28734|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28734|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28734|3|1|Includes:|Y
01|28734|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28734|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28734|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28734|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28734|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28734|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28734|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28734|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28734|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28735|1|1|Includes:|Y
01|28735|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28735|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28735|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28735|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28735|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28735|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28735|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28735|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28735|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28735|3|1|Includes:|Y
01|28735|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28735|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28735|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28735|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28735|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28735|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28735|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28735|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28735|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28737|1|1|Includes:|Y
01|28737|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28737|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28737|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28737|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28737|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28737|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28737|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28737|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28737|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28737|3|1|Includes:|Y
01|28737|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28737|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28737|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28737|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28737|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28737|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28737|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28737|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28737|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28738|1|1|Includes:|Y
01|28738|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28738|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28738|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28738|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28738|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28738|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28738|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28738|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28738|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28738|3|1|Includes:|Y
01|28738|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28738|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28738|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28738|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28738|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28738|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28738|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28738|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28738|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28739|1|1|Repair of #1 BT35-Z12-90|N
01|28739|1|2|Reference RGA# R-46081|Y
01|28739|4|1|Z12 #16 3/8 Ball Bearings|Y
01|28739|5|1|Z12 #17 3/16 Ball Bearings|Y
01|28739|6|1|Labor charge for #1 BT35-Z12-90|Y
01|28739|8|1|Repair of #2 BT35-Z12-90|N
01|28739|12|1|Z12 #16 3/8 Ball Bearings|Y
01|28739|13|1|Z12 #16 3/16 Ball Bearings|Y
01|28739|14|1|Labor charge for #2 BT35-Z12-90|Y
01|28739|15|1|Lyndex tap holder will take the same collet system as|Y
01|28739|15|2|BT35-Z12-90.  Item is in stock and ready to ship.|Y
01|28740|1|1|Includes:|Y
01|28740|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28740|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28740|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28740|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28740|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28740|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28740|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28740|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28740|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28740|3|1|Includes:|Y
01|28740|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28740|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28740|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28740|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28740|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28740|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28740|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28740|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28740|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28742|1|1|Includes:|Y
01|28742|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28742|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28742|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28742|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28742|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28742|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28742|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28742|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28742|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28742|3|1|Includes:|Y
01|28742|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28742|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28742|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28742|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28742|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28742|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28742|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28742|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28742|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28743|1|1|Includes:|Y
01|28743|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28743|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28743|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28743|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28743|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28743|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28743|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28743|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28743|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28743|3|1|Includes:|Y
01|28743|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28743|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28743|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28743|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28743|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28743|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28743|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28743|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28743|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28744|1|1|Includes:|Y
01|28744|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28744|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28744|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28744|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28744|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28744|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28744|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28744|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28744|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28744|3|1|Includes:|Y
01|28744|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28744|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28744|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28744|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28744|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28744|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28744|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28744|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28744|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28745|1|1|Includes:|Y
01|28745|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28745|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28745|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28745|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28745|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28745|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28745|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28745|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28745|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28745|3|1|Includes:|Y
01|28745|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28745|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28745|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28745|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28745|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28745|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28745|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28745|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28745|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28762|1|1|Includes:|Y
01|28762|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28762|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28762|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28762|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28762|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28762|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28762|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28762|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28762|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28762|3|1|Includes:|Y
01|28762|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28762|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28762|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28762|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28762|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28762|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28762|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28762|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28762|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28765|1|1|Includes:|Y
01|28765|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28765|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28765|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28765|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28765|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28765|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28765|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28765|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28765|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28765|3|1|Includes:|Y
01|28765|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28765|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28765|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28765|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28765|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28765|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28765|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28765|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28765|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28771|1|1|Includes:|Y
01|28771|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28771|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28771|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28771|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28771|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28771|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28771|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28771|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28771|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28771|3|1|Includes:|Y
01|28771|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28771|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28771|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28771|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28771|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28771|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28771|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28771|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28771|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28775|1|1|Includes:|Y
01|28775|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28775|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28775|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28775|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28775|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28775|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28775|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28775|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28775|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28775|3|1|Includes:|Y
01|28775|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28775|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28775|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28775|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28775|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28775|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28775|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28775|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28775|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28777|1|1|Includes:|Y
01|28777|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|28777|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|28777|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|28777|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|28777|1|6|1x C4006-1000-4.00     1 EMH|Y
01|28777|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|28777|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|28777|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28777|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|28777|3|1|Includes:|Y
01|28777|3|2|1x C4001-1000-1.75  1 SMH|Y
01|28777|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|28777|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|28777|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|28777|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|28777|3|7|1x C4006-1000-4.00    1 EMH|Y
01|28777|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|28777|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|28777|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|28780|1|1|Non-Cancelable & Non-Returnable|Y
01|28789|1|1|Reference RGA# R-46096|Y
01|28789|3|1|Replace spindle cover collet nuts bearings seals|Y
01|28789|3|2|and o-rings.|Y
01|28789|3|3|Labor is included.|Y
01|28833|1|1|130MM face with Haas Sigma 5 motors and cable sets|Y
01|28842|1|1|Quotation is for a Refurbished AMP.|Y
01|28842|1|2|*Please note this AMP is no longer available at Fanuc|Y
01|28842|1|3|new.|Y
01|28842|2|1|Same as TCE-97277(2)-J2|Y
01|28854|3|1|Balance due on 4/21|Y
01|28864|1|1|CAT40 Tooling Package-2en Standard length holders and|Y
01|28864|1|2|the Shrink Fit unit for $11500.00.|Y
01|28872|2|1|This item is listed at your NET cost|Y
01|28883|1|1|NKA01-46000-replaces NKA01-20000 and comes with hex|Y
01|28883|1|2|nut.|Y
01|28883|5|1|NKA01-45000 replaces NKA01-13000 and comes with hex|Y
01|28883|5|2|nut.|Y
01|28889|1|1|Reference RGA# R-46151|Y
01|28889|3|1|Replace all bearings seals and o-rings.|Y
01|28889|3|2|Labor is included.|Y
01|28889|3|3|Quoted as a net.|Y
01|28893|1|1|Sale of this item is final|Y
01|28904|7|1|12 pcs Stock - balance of 5 pcs = 6 wks & 1pc = 10 wks|Y
01|28922|1|1|Reference RGA# R-46158|Y
01|28922|5|1|Labor charge is $110/hour billing for 1.5 hours.|Y
01|28922|9|1|Reference RGA# 46158|Y
01|28922|14|1|Labor charge is $110/hour billing for 1.5 hours.|Y
01|28923|1|1|**Non-coolant for Enshu JE30SH|Y
01|28923|2|1|**Coolant Through for Enshu JE30SH|Y
01|28923|11|1|*duplication of line 7|Y
01|28936|1|1|Reference RGA# T-46138|Y
01|28938|1|1|High Speed Twin Spindle table for S700 Brother Machine|Y
01|28938|1|2|Includes additional axis interface kit|Y
01|28938|2|1|$1000.00 Free Tooling Promo|Y
01|28946|1|1|Tooling Certificate Number: 5410-536-120214|Y
01|28956|1|1|Special Discount for Repair/Replacement|Y
01|28956|1|2|One Time Special Discount.|Y
01|28969|6|1|Non-Cancelable & Non-Returnable|Y
01|28995|1|1|for MNZ20-ER11(X)-SUB-SP|Y
01|29011|1|1|Replaces XCA-V-UNIT-DC-FL463503S2F.|Y
01|29034|1|1|Non-Cancelable & Non-Returnable|Y
01|29034|2|1|Non-Cancelable & Non-Returnable|Y
01|29041|2|1|Wrench for C5007-1000-3.50|Y
01|29041|21|1|*offered 90mm projection length|Y
01|29050|1|1|Item is considered discontinued. However we have a|Y
01|29050|1|2|some in stock at factory. Once order is placed items|Y
01|29050|1|3|cannot be cancelled or returned.|Y
01|29062|1|1|Package includes shrink unit 10 standard GL CAT40|Y
01|29062|1|2|shrink fit holders and two 40 taper shrink fit pots.|Y
01|29083|10|1|*give away|Y
01|29097|1|1|Reference RGA# R46166|Y
01|29097|1|2|MZQT46-ER16-AD-HS s/n: 29195 02 Sent in for evaluation|N
01|29097|3|1|Replace damaged gears.|Y
01|29097|3|2|Replace all bearings seals and o-rings.|Y
01|29097|3|3|Labor is included.|Y
01|29097|3|4|This is a one time repair cost as courtesy to the|Y
01|29097|3|5|customer.|Y
01|29101|1|1|Reference RGA# R-45795|Y
01|29101|1|2|CAT50-UMT200UW sent in for evaluation/re-calibration.|N
01|29101|3|1|9V Battery|Y
01|29108|13|1|Cross from 150tg1375|Y
01|29108|14|1|cross from ss100DA104731|Y
01|29135|4|1|*Use in conjunction with straight shank ext. 5/16 id|Y
01|29135|4|2|ST75-SF0312-6.30|Y
01|29135|20|1|Pre-balanced and balanceable|N
01|29135|22|1|100mm compared to Haimer 130mm|Y
01|29137|1|1|3 pcs Stock- 7 pcs C5057-0040-12.00DIN|Y
01|29152|1|1|Reference RGA# R-45653|Y
01|29152|7|1|For PF-2 #1|Y
01|29152|9|1|Reference RGA# R-45653|Y
01|29152|15|1|N Style Batteries need to be replaced.|Y
01|29152|16|1|For PF-2 #2|Y
01|29152|18|1|Reference RGA# R-45653|Y
01|29152|23|1|N Style Batteries need to be replaced.|Y
01|29152|24|1|For PF-2 #3|Y
01|29170|1|1|Reference RGA# T-46176|Y
01|29172|1|1|350MM Tilt Rotary table with hydraulic brake|Y
01|29172|1|2|Rotary Axis Aplha iF8/4000 & Tilt Axis Aplha iF12/4000|Y
01|29172|2|1|500PSI Hydualic Unit with Hoses and Solenoids|Y
01|29174|1|1|Includes adapter plate for mounting onto CNC302|Y
01|29178|1|1|1 pcs Stock- 4 pcs = 16 weeks|Y
01|29180|1|1|180MM High Speed Table set with TC32A interface pkg|Y
01|29180|1|2|4-6 Weeeks ARO|Y
01|29192|7|1|NS251R026 Clamp Lever|Y
01|29212|1|1|Reference RGA# R-46191|Y
01|29212|4|1|TC0562(C)-3 #3 Cover (A)|Y
01|29212|5|1|TC0562(C)-20 #20 Spring|Y
01|29212|6|1|TC0562(C)-21 #21 Stop Ring|Y
01|29230|2|1|*customer to apply loctite to threads|Y
01|29232|1|1|SPECIAL|Y
01|29232|1|2|NET PRICE|Y
01|29232|3|1|SPECIAL|Y
01|29232|3|2|NET PRICE|Y
01|29232|5|1|SPECIAL|Y
01|29232|5|2|NET PRICE|Y
01|29232|18|1|SPECIAL|Y
01|29253|1|1|Reference RGA# R-46214|Y
01|29294|2|1|Non-Cancelable & Non-Returnable|Y
01|29306|3|1|Balance in 1-2 weeks|Y
01|29308|1|1|Fancu Motor Alpha XiF2|Y
01|29308|1|2|Productivity to provide drive bulk head cables and|Y
01|29308|1|3|installation.|Y
01|29316|1|1|10 pcs ETA 6/1 balance in 8-9 weeks|Y
01|29316|3|1|Balance in 4-5 weeks|Y
01|29320|1|1|2-CNCZ180LYABR tables with TC32B installation kit|Y
01|29320|1|2|Kit includes: Drive units junction box solenoid box|Y
01|29320|1|3|main cable set center divider sheet metal cabinet|Y
01|29320|1|4|cables including B-Master cable set.|Y
01|29327|1|1|This item is listed at your NET cost|Y
01|29369|1|1|We have plenty of stock|Y
01|29375|1|1|Net Price Each|Y
01|29375|1|2|Non-Cancelable & Non-Returnable|Y
01|29378|12|1|Sample Tooling Cert|Y
01|29379|1|1|Notes*** The machine needs one external m-code.|Y
01|29379|1|2|Install price- $2500.00 Estimated Install time 5-18|Y
01|29393|1|1|Motor gear for CNC200|Y
01|29393|5|1|8hrs to convert CNC200 to AA21 control|Y
01|29401|1|1|Includes shrink fit unit 10 standard GL CAT40 shrink|Y
01|29401|1|2|fit holders and two 40-taper shrink fit pots|Y
01|29407|29|1|4 gage length|Y
01|29407|31|1|4.13 gage length|Y
01|29407|31|2|Alternative for 1/4 3/81/2 5/8  Hyd Chuck|Y
01|29407|41|1|4.13 gage length|Y
01|29407|41|2|Alternative for 3/4 Hyd Chuck|Y
01|29407|52|1|AC6-MAS-220 Master Gauge/Test Bar|Y
01|29431|1|1|Reference RGA# T-46169|Y
01|29431|1|2|CNCZ321LYA s/n: 6877|N
01|29462|1|1|Non-Cancelable & Non-Returnable|Y
01|29483|1|1|RKS part# 711-13|Y
01|29487|1|1|Mim Old# 05.0611.7340.505 Mim New# 124256|Y
01|29487|2|1|Mim Old# 05.0611.7341.505 Mim New# 124259|Y
01|29489|1|1|Reference RGA# T-46211|Y
01|29494|1|1|105MM High Speed table with Mitsubishi motor.|Y
01|29494|2|1|Special direct mount cable set|Y
01|29494|3|1|Installation includes: Drive unit cable installation|Y
01|29494|3|2|parameter changes mounting of table service time|Y
01|29494|3|3|& service travel.|Y
01|29494|5|1|105MM Support table with pneumatic brake|Y
01|29494|6|1|105MM High Speed table w/right hand mounted Mitsubishi|Y
01|29494|6|2|motor.|Y
01|29499|1|1|130MM twin spindle table with high column and back hand|Y
01|29499|1|2|mounted Alpha iF2/5000 motors and direct mount cables.|Y
01|29502|5|1|net price|Y
01|29515|10|1|B/O = 4 weeks if ordered by 5-13|Y
01|29515|19|1|B/O = 4 weeks if ordered by 5-13|Y
01|29515|22|1|B/O = 4 weeks if ordered by 5-13|Y
01|29515|25|1|B/O = 4 weeks if ordered by 5-13|Y
01|29515|28|1|B/O = 4 weeks if ordered by 5-13|Y
01|29515|37|1|B/O = 4 weeks if ordered by 5-13|Y
01|29515|40|1|B/O = 4 weeks if ordered by 5-13|Y
01|29515|43|1|B/O = 4 weeks if ordered by 5-13|Y
01|29515|49|1|B/O = 4 weeks if ordered by 5-13|Y
01|29515|55|1|B/O = 4 weeks if ordered by 5-13|Y
01|29537|1|1|130MM tilt rotary table with Brother S700 installation|Y
01|29537|1|2|kit. The kit includes drive units external cables and|Y
01|29537|1|3|internal cabinet cable sets.|Y
01|29541|1|1|Reference RGA# R-46065|Y
01|29541|1|2|OKL3-ER32X s/n: AL561 Sent in for evaluation/repair.|N
01|29541|3|1|Replace gears bearings seals and o-rings.|Y
01|29541|3|2|Labor is included.|Y
01|29541|4|1|2x OKL3-ER32Z-OFMS s/n: AL191 & n/a.|N
01|29541|6|1|Spindle gears clutch collet nut are all damaged.|Y
01|29541|6|2|Bearings seals and o-rings are worn.|Y
01|29541|6|3|These must all be replaced.  Labor is included.|Y
01|29541|6|4|It is our recommendation that these be replaced.|Y
01|29541|8|1|2x OKL3-ER32Z-OFMS are severely damaged we recommend|Y
01|29541|8|2|replacing these holders.  1pc is currently in stock|Y
01|29541|8|3|2nd unit ETA Mid-July.|Y
01|29548|1|1|200MM Direct Drive Fanuc Table 200RPM Rotary Axis|Y
01|29548|1|2|150RPM Tilt Axis with direct mount cable sets|Y
01|29551|1|1|200MM Direct Drive table w/direct mount cable set|Y
01|29551|1|2|200RPM rotary axis and 150RPM tilt axis|Y
01|29583|1|1|Same as RKS# 315-14|Y
01|29594|1|1|Reference RGA# R-46233|Y
01|29594|1|2|OKEX-ER32Z s/n: AL0275 Sent in for evaluation/repair.|N
01|29594|3|1|Replace collet nut bearings seals and o-rings.|Y
01|29594|3|2|Labor is included.|Y
01|29595|1|1|Delivery is 4-6 weeks|Y
01|29603|1|1|Reference RGA# R-46212|Y
01|29603|1|2|OKLT2-ER32X s/n: A0097 Spindle will not turn.|N
01|29603|3|1|Replace collet nut bearings seals and o-rings.|Y
01|29603|3|2|Labor is included.|Y
01|29604|3|1|Non-Cancelable & Non-Returnable|Y
01|29612|2|1|BT30-SK6-90-J|Y
01|29612|6|1|BT30-SK10-90-J|Y
01|29612|8|1|BT30-SK10-120-J|Y
01|29612|11|1|BT30-SK16-120-J|Y
01|29612|26|1|For SK10 holders- for cutter shank 6mm~|Y
01|29612|27|1|For SK10 holders- for cutter shank 4mm~5.5mm|Y
01|29616|1|1|Item considered special. Once order is placed item|Y
01|29616|1|2|cannot be cancelled or returned.|Y
01|29632|5|1|Custom stopping block|Y
01|29632|6|1|Installation labor and expenses.|Y
01|29638|1|1|Direct Drive table with Brother S500-S700 installation|Y
01|29638|1|2|kit.|Y
01|29666|2|1|Installtion kit: Dual axis drive unit external cables|Y
01|29666|2|2|bulk head to cabinet cables fiber optic communication|Y
01|29666|2|3|cables and short bar.|Y
01|29666|3|1|Installaion kit: Dual axis drive cabinet cables bulk|Y
01|29666|3|2|bulk head cable sets communications fiber optic cable|Y
01|29668|6|1|Installation kit: Drive unit cabinet cable set|Y
01|29668|6|2|bulk head cable set comm cables fiber optic cables|Y
01|29685|3|1|Installtion kit: Dual axis drive unit external cables|Y
01|29685|3|2|bulk head to cabinet cables fiber optic communication|Y
01|29685|3|3|cables and short bar.|Y
01|29685|4|1|Installaion kit: Dual axis drive cabinet cables bulk|Y
01|29685|4|2|bulk head cable sets communications fiber optic cable|Y
01|29713|1|1|This item is listed at your NET cost|Y
01|29724|3|1|Draw Bolt for NT40 Socket|Y
01|29735|1|1|Reference RGA# R-46221|Y
01|29747|4|1|*Use in conjunction with straight shank ext. 5/16 id|Y
01|29747|4|2|ST75-SF0312-6.30|Y
01|29747|19|1|Pre-balanced and balanceable|N
01|29747|21|1|100mm compared to Haimer 130mm|Y
01|29755|1|1|Reference RGA# 46236|Y
01|29755|3|1|Replace drive shaft collet nut bearings seals and|Y
01|29755|3|2|o-rings. Labor is included.|Y
01|29759|1|1|Reference RGA# 46073|Y
01|29759|3|1|Replace collet nut bearings seals and o-rings.|Y
01|29759|3|2|Labor is included.|Y
01|29766|2|1|A2-8 for HW-12-2J3J-HS|Y
01|29766|2|2|This line is listed at your NET cost|Y
01|29766|3|1|Air freight charge from factory to Lyndex-Nikken|Y
01|29789|1|1|Reference RGA# T-46144|Y
01|29789|1|2|5AX-2MT-105-120FA s/n: 8085|N
01|29789|36|1|1x M2105R037 Seal|Y
01|29789|37|1|1x M2105R039 Seal|Y
01|29809|3|1|We can offer an additional 3 percent off on matching|Y
01|29809|3|2|collets with purchase of matching chuck - 35% off total|Y
01|29855|2|1|Cable Set Length to be determined.|Y
01|29855|3|1|Installation & Interface for Fanuc 0i-MB Control|Y
01|29855|3|2|Machine is Mori Seiki DuraVertical 5100|Y
01|29856|1|1|Pricing for Cables and tank are included in price.|Y
01|29856|1|2|Machine: Okuma MB-56 High Column w/ OSP 3000 Control|Y
01|29856|2|1|Cable Length to be Determined.|Y
01|29859|1|1|Machine: YCM FV50-T with Fanuc 0i-MD Control|Y
01|29859|2|1|Cable Length to be Determined|Y
01|29859|5|1|Installation and 4th Axis Interface|Y
01|29860|1|1|Machine: Feeler VB1100 with Fanuc 01i-MD Control|Y
01|29860|5|1|Installation and Interface for 0i-MD Single Axis|Y
01|29862|1|1|Machine: Fanuc Robodrill with Fanuc 31i-B5 Control|Y
01|29864|1|1|Machine: Doosan VM-960L with Fanuc 31i-B Control|Y
01|29864|2|1|Cable Lenght to be Determined|Y
01|29864|5|1|Installation and Interface for Fanuc 31i-B Control|Y
01|29867|2|1|Non-Cancelable & Non-Returnable|Y
01|29871|1|1|*net price|Y
01|29875|2|1|C50FHM-ER32-215-110TP  No internal coolant|Y
01|29885|1|1|320MM HIgh Speed table with Fanuc Alpha iF12/3000|Y
01|29885|2|1|500 PSI hydraulic unit with solenoid pressure switch &|Y
01|29885|2|2|hoses.|Y
01|29885|5|1|Includes drive unit fiber optic communications cable|Y
01|29885|5|2|bulk head cables external cables labour and travel|Y
01|29888|1|1|Machine: Haas VF-Series with Haas Sigma5 Control|Y
01|29896|1|1|3 pcs stock- 1 pcs= 8-10 weeks|Y
01|29908|1|1|Tooling Certificate Number: 5410-536-120214|Y
01|29944|1|1|Old Mimatic part# 05.1911.7342.402|Y
01|29944|1|2|New Mimatic part# 125027|Y
01|29958|1|1|Mori T00203|Y
01|29958|2|1|Mori T00202|Y
01|29958|3|1|Mori T00386|Y
01|29966|1|1|Reference RGA# R-46272|Y
01|30016|2|1|PROMO Price 35% C40SF-0750-6.30|N
01|30022|1|1|Pricing good for up to 2 pcs. Increased discount of|Y
01|30022|1|2|50% off instead of bringing in for repair.|Y
01|30036|1|1|180MM High Speed table with S500X1 S700X1 installation|Y
01|30036|1|2|kit|Y
01|30036|2|1|2-180MM High Speed tables w/R450X1 installation kit|Y
01|30036|3|1|$1500.00 Free Tooling Promo|Y
01|30041|1|1|321MM Left Hand mounted Alpha iF12/3000 motor with|Y
01|30041|1|2|hydraulic brake system and shortest motor cover|Y
01|30041|1|3|possible.|Y
01|30041|1|4|500 PSI required with solenoid and pressure switch.|Y
01|30053|4|1|Motor Mount Plate 2-3 week delivery|Y
01|30077|1|1|BALANCE IN 1-2 WEEKS|Y
01|30077|2|1|BALANCE IN 1-2 WEEKS|Y
01|30077|3|1|BALANCE IN 1-2 WEEKS|Y
01|30091|1|1|With coolant nut SKN-10BJ installed at Lyndex-Nikken.|Y
01|30091|2|1|Installed on the HSK40E-SK10-60P|Y
01|30092|2|1|Non-Cancelable & Non-Returnable|Y
01|30095|1|1|This item is listed at your NET cost|Y
01|30100|1|1|105MM High Speed table|Y
01|30100|1|2|Fanuc A06B-0205-B000 Alpha 2/5000i motor|Y
01|30100|1|3|DC24v Solenoid On-Clamp Normally Open|Y
01|30100|1|4|Cable connectors mounted from the front|Y
01|30101|1|1|*Package Pricing w/ 10pc holders|Y
01|30107|2|1|Installation and Interface Includes the following|Y
01|30107|2|2|Interface for Mori NV-5000 with Fanuc 31i Control.|Y
01|30107|2|3|Amplifiers cables expansion cards all travel/labor.|Y
01|30142|6|1|Discount reflects special net price per Bob Berongi.|Y
01|30142|6|2|Tool is non returnable once it has been placed in|Y
01|30142|6|3|spindle.|Y
01|30155|1|1|Additional discount to not send in un-repairable holder|Y
01|30159|1|1|Non-Cancelable & Non-Returnable|Y
01|30187|1|1|Repair of customer's tap collets sent in on|Y
01|30187|1|2|RGA# R-46189.|Y
01|30187|1|3|1x ZKG12-3/8U 1x ZKG15-1/4U & 1x ZKG12-5/16U|N
01|30187|3|1|All 3 units will be cleaned up and re-greased.|Y
01|30187|3|2|Springs were jammed with ball bearings.|Y
01|30187|3|3|No parts need to be replaced.|Y
01|30235|3|1|Air freight charge from factory to Lyndex-Nikken|Y
01|30240|1|1|Includes:|Y
01|30240|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|30240|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|30240|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|30240|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|30240|1|6|1x C4006-1000-4.00     1 EMH|Y
01|30240|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|30240|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|30240|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|30240|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|30240|3|1|Includes:|Y
01|30240|3|2|1x C4001-1000-1.75  1 SMH|Y
01|30240|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|30240|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|30240|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|30240|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|30240|3|7|1x C4006-1000-4.00    1 EMH|Y
01|30240|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|30240|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|30240|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|30244|1|1|200MM table with Alpha iS8/4000 Fanuc motor|Y
01|30244|4|1|Installation includes: Bulkhead cables external cables|Y
01|30244|4|2|parameter changesservice time and travel.|Y
01|30245|1|1|Non-Cancelable & Non-Returnable|Y
01|30252|1|1|Reference RGA# T-46262|Y
01|30252|1|2|5AX-4MT s/n: 1100|N
01|30252|59|1|M4121R082: Brake Pistons|Y
01|30283|1|1|Minimum order 10 pieces.|Y
01|30289|1|1|1 week ARO|Y
01|30289|2|1|Installation to include Servo motor cables drive all|Y
01|30289|2|2|all connectors and labor|Y
01|30289|3|1|External Cable set up to 10ft.|Y
01|30299|1|1|Reference RGA# T-46228|Y
01|30306|1|1|Nikken 350mm Tilt Rotary Table with Fanuc Motors.|Y
01|30306|2|1|Daiken Hydraulic Unit for Rotary Table clamping system.|Y
01|30306|3|1|Installation includes amplifiers axis expansion cards|Y
01|30306|3|2|all cables travel and labor.|Y
01|30306|3|3|Note:  JM Precision must get the additional 4th and 5th|Y
01|30306|3|4|axis option parameters from Fanuc USA.  Aprox Cost $500|Y
01|30306|4|1|Free $1000 Tooling Certificate good for list price|Y
01|30306|4|2|Tool Holders.|Y
01|30316|1|1|Includes shrink fit unit 10 standard gage length|Y
01|30316|1|2|HSK40E shrink fit holders 2 HSK40E shrink fit pots|Y
01|30328|1|1|Reference RGA# T-46224|Y
01|30328|1|2|CNC202LFA s/n: 7276|N
01|30329|1|1|Reference RGA# T-46223|Y
01|30329|1|2|CNC202LFA s/n: 8327|N
01|30354|1|1|200MM Tilt Rotary table with built in rotary union for|Y
01|30354|1|2|3R macro chuck|Y
01|30366|1|1|200MM tilt rotary with pneumatic brake system and|Y
01|30366|1|2|manifold block and 1 risers for 3000 psi rotary union|Y
01|30366|6|1|3000 PSI rotary union with two ports|Y
01|30366|6|2|Delivery of rotary union 8 Weeks ARO|Y
01|30373|1|1|Ref RGA# 46263|Y
01|30373|6|1|MO50DN: Positioning Pin|Y
01|30373|7|1|IRTW-13: Snap Ring|Y
01|30373|8|1|P-45(U): Teflon Seal|Y
01|30373|9|1|MHB50-82C: Housing|Y
01|30378|1|1|Reference RGA# R-46250|Y
01|30378|1|2|MZMP5-SB1000X s/n: 51144 01|N
01|30378|3|1|Resurfacing two spindles.|Y
01|30378|3|2|Replacing all bearings seals and o-rings.|Y
01|30378|3|3|Labor is included.|Y
01|30389|1|1|Non-Cancelable & Non-Returnable|Y
01|30389|1|2|Net Price Each|Y
01|30391|1|1|Mazak Capto C4 X-Axis Straight Live Tool|Y
01|30391|1|2|External Coolant Max 6500 RPM|Y
01|30391|1|4|Please note that this is not a standard stock item and|Y
01|30391|1|5|is considered special.  It is non-cancellable and|Y
01|30391|1|6|non-returnable upon reciept of a PO and final approval.|Y
01|30391|1|7|This item is listed at NET Cost.  Freight from Lyndex|Y
01|30391|1|8|Nikken to final destination has not been added but will|Y
01|30391|1|9|once determined.|Y
01|30400|1|1|Net Price Each|Y
01|30400|1|2|Non-Cancelable & Non-Returnable|Y
01|30415|2|1|Net Price|Y
01|30419|1|1|130MM Tilt Rotary table with two Nikken Alpha controls|Y
01|30419|1|2|including cable sets pendant for programming M-code|Y
01|30419|1|3|cable and power cable. Positioning only via M-code|Y
01|30419|2|1|M-code installtion|Y
01|30419|3|1|$2500.00 free tooling promo for indexer purchase|Y
01|30420|3|1|NVX5100 installation including drive unit bulkhead|Y
01|30420|3|2|cables external cables parameter changes time & trav|Y
01|30420|4|1|$1000.00 free tooling promo|Y
01|30427|1|1|Quoted as 1 holder.|Y
01|30427|3|1|Quoted 2 to 5 holders.|Y
01|30427|5|1|Quoted 6+ pieces.|Y
01|30450|5|1|Please note this tool has been used. If customer is|Y
01|30450|5|2|interested we can pull from shelf and inspect.|Y
01|30450|5|3|Usually these are in new condition and maybe was just|Y
01|30450|5|4|put into spindle.|Y
01|30456|1|1|Non-Cancelable & Non-Returnable|Y
01|30467|1|1|1 pcs Stock- 4 pcs = 7 weeks|Y
01|30468|1|1|Nikken 105mm Rotary Table without Siemens Motor.|Y
01|30468|1|2|Hyundai Wia to send the Siemens Motor and external|Y
01|30468|1|3|cables to Lyndex-Nikken for mounting.|Y
01|30468|4|1|Installation:  Hyundai Wia to supply the Siemens|Y
01|30468|4|2|Interface Kit including Siemens Motor.  Both Siemens &|Y
01|30468|4|3|Hyundai Wia are to be onsight with Lyndex-Nikken during|Y
01|30468|4|4|installation.  Lyndex-Nikken will assist in hooking up|Y
01|30468|4|5|the Siemens interface for the Nikken CNCZ-105ZA rotary.|Y
01|30468|4|6|Note:  Lyndex-Nikken does not have Siemens experience.|Y
01|30468|4|7|Lyndex-Nikken will attempt to learn the Siemens install|Y
01|30468|4|8|and get the Nikken rotary table up and running.|Y
01|30472|1|1|Reference RGA# T-46288|Y
01|30472|1|2|5AX-130FA s/n: 3512|N
01|30473|2|1|2.36D|Y
01|30478|2|1|75mm|Y
01|30480|1|1|Quoted with DIN New Part Number is CAT50-C3/4F-105U|Y
01|30480|2|1|Quoted with DIN New Part Number is CAT50-C3/4F-165U|Y
01|30480|4|1|Quoted with DIN New Part Number is CAT50-SK10F-105U|Y
01|30495|2|1|Special 10mm Shim Plate|Y
01|30495|2|2|3 to 4 weeks|Y
01|30497|1|1|AX123R075 Face plate for 5AX-130FA|Y
01|30514|1|1|1 Piece Price|Y
01|30514|2|1|2 to 6 Piece Price|Y
01|30514|3|1|7+ piece price|Y
01|30516|1|1|Holders modified with: Balluf Chip and HS Coolant Nut|Y
01|30516|1|2|installed.|Y
01|30529|1|1|Includes SF unit 4 pcs 1/8 & 3/16 2 pcs 3/4|Y
01|30529|1|2|holders and two 40-taper shrink fit pots.|Y
01|30530|1|1|Includes SF unit & two 40-taper shrink fit pots.|Y
01|30533|1|1|5-6 Week delivery with Haas motor and cables|Y
01|30539|1|1|*Net price w/ modification included|Y
01|30550|1|1|Full 4th and 5th axis interface kit. Includes Amps|Y
01|30550|1|2|Drive Boards internal and external cables.|Y
01|30550|1|3|Installation is not included.  Heartland to install|Y
01|30550|1|4|the rotary table.|Y
01|30550|3|1|Free $1000 Tooling Certificate good for list price|Y
01|30550|3|2|tool holders.|Y
01|30552|1|1|Reference RGA# T-46312|Y
01|30552|1|2|CNC401HMA-APC s/n: 5673|N
01|30553|1|1|Nikken 200mm Rotary Table with Fanuc Motor.|Y
01|30553|2|1|Manual Tail Stock for CNC-202FA-M|Y
01|30553|3|1|6 3-Jaw Chuck and Adapter Plate.|Y
01|30553|4|1|Clamping Tail Support to match CNC-202FAM.|Y
01|30553|5|1|Free $1000 Tooling Certificate.  Good for list price|Y
01|30553|5|2|Tool holders.|Y
01|30553|6|1|Insterface Kit includes Fanuc Amplifiers Drives|Y
01|30553|6|2|and all cables.|Y
01|30553|6|3|Note:  Installation is not included.  Heartland to do|Y
01|30553|6|4|the installation of the rotary table.|Y
01|30554|3|1|This item is non-cancellable non-returnable upon|Y
01|30554|3|2|receipt of a firm purchase order.|Y
01|30556|2|1|Manual Tail Stock for CNC-202FA-M|Y
01|30556|3|1|6 3-Jaw Chuck and Adapter Plate.|Y
01|30556|4|1|Clamping Tail Support to match CNC-202FAM.|Y
01|30556|5|1|Free $1000 Tooling Certificate.  Good for list price|Y
01|30556|5|2|Tool holders.|Y
01|30556|6|1|Insterface Kit includes Fanuc Amplifiers Drives|Y
01|30556|6|2|and all cables.|Y
01|30556|6|3|Note:  Installation is not included.  Heartland to do|Y
01|30556|6|4|the installation of the rotary table.|Y
01|30572|1|1|Non-Cancelable & Non-Returnable|Y
01|30574|2|1|*included w/ machine|Y
01|30578|1|1|Reference RGA# T-46330|Y
01|30578|1|2|CNC202LFA s/n: 11010|N
01|30578|3|1|No parts need to be replaced.|Y
01|30589|1|1|This item is listed at your NET cost|Y
01|30589|2|1|This item is listed at your NET cost|Y
01|30590|1|1|Non-Cancelable & Non-Returnable|Y
01|30601|1|1|Non-Cancelable & Non-Returnable|Y
01|30603|2|1|Reference RGA# R-46352|Y
01|30603|2|2|MNL12-ER40X s/n: A0198|N
01|30603|4|1|Replaceing spindle gears bearings seals and o-rings.|Y
01|30603|4|2|Repair price includes labor.|Y
01|30603|4|3|*Please note this is an estimate price of repair may|Y
01|30603|4|4|go up depending on the extent of the damage.|Y
01|30603|7|1|Discount reflect core trade-in.|Y
01|30638|1|1|Reference RGA# T-46331|Y
01|30638|1|2|CNC202LFA s/n: 8229|N
01|30640|1|1|Reference RGA# T-46354|Y
01|30643|2|1|*included w/ machine|Y
01|30661|1|1|4-Hole Burn|Y
01|30661|2|1|2-Hole Burn|Y
01|30671|1|1|Part Number: T32002|Y
01|30671|1|2|Special ER32 Straight Tool for Mori SL-35 Machine.|Y
01|30671|1|3|Note: Approval Drawing is required before MFG proceeds.|Y
01|30671|1|4|Please Note that this is not a standard stock item|Y
01|30671|1|5|and is considered special.  It is non-cancellable and|Y
01|30671|1|6|non-returnable upon receipt of a firm PO and final|Y
01|30671|1|7|approval.  This item is listed at NET cost.  Freight|Y
01|30671|1|8|from Lyndex-Nikken to final destination has not been|Y
01|30671|1|9|added but will be once determined.|Y
01|30682|1|1|130MM Tilt Rotary table with installation kit for S500X|Y
01|30682|2|1|500 PSI hydraulic cylinder for 5C collet closer|Y
01|30682|3|1|Air/Hydraulic booster pump with hoses and actuator|Y
01|30692|1|1|This item is listed at your NET cost|Y
01|30695|1|1|PS-123-AIR to be installed in NC5-46-SK10C-75 @ factory|Y
01|30695|2|1|To be installed in NC5-46-SK10C-75 @ factory|Y
01|30702|1|1|Non-Cancelable & Non-Returnable|Y
01|30702|1|2|Net Price Each|Y
01|30704|1|1|Tooling Certificate Number: E12650-617-042015|Y
01|30717|1|1|Reference RGA# R-46367|Y
01|30722|8|1|-SJAW-OS-R1775|N
01|30732|2|1|From Lyndex-Nikken slightly used/refurbiesed inventory|Y
01|30758|1|1|260MM table with Nikken controller|Y
01|30758|1|2|Includes: Cables pendant M-code cable and power cable|Y
01|30758|1|3|Walter USA is responsible for the installtion.|Y
01|30758|1|4|Walter USA is responsible for the application.|Y
01|30758|1|5|2 M-codes required|Y
01|30760|1|1|Reference RGA# R-46278|Y
01|30760|3|1|Replace clutch collet nut bearings seals and o-rings|Y
01|30760|3|2|Labor is included|Y
01|30764|2|1|Net Price Each|Y
01|30764|2|2|Non-Cancelable & Non-Returnable|Y
01|30774|1|1|Reference RGA# R-46281|Y
01|30774|3|1|Replace collet nut bearings seals and o-rings.|Y
01|30774|3|2|Labor is included|Y
01|30787|1|1|Includes the angle head spindle and nut wrenches and|Y
01|30787|1|2|a storage case.|Y
01|30787|2|1|This is a blank stop block with the tapered bushing|Y
01|30787|2|2|already installed.  Will need modified by customer to|Y
01|30787|2|3|fit their machine.|Y
01|30811|1|1|This item is listed at your NET cost.|Y
01|30826|6|1|B30-4500 Can be used as a substitute for PS-16|Y
01|30853|1|1|Reference RGA# R-46383|Y
01|30854|1|1|Non-Cancelable & Non-Returnable|Y
01|30857|1|1|Net Price Each|Y
01|30857|1|2|Non-Cancelable & Non-Returnable|Y
01|30878|1|1|105MM High Speed Table with S500 installation kit.|Y
01|30878|2|1|100MM Twin Spindle table with S500 installation kit.|Y
01|30896|1|1|Net Price Each|Y
01|30896|1|2|Non-Cancelable & Non-Returnable|Y
01|30933|1|1|*2pc pricing|Y
01|30933|3|1|*4pc pricing|Y
01|30935|2|1|Non-coolant system #2 alternative to B50R5-0875-3.86(C)|Y
01|30935|3|1|System #1 stock alternative to B50R5-0875-3.86(C)|Y
01|30935|4|1|System #3 stock alternative to B50R5-0875-3.86(C)|Y
01|30941|2|1|HSK63A-C32-110|Y
01|30941|3|1|HSK63A-C32-115|Y
01|30953|1|1|Nikken 5AX-201MA Air Clamp or Hyraulic Clamping.|Y
01|30953|1|2|Please specify Air or Hyd Clamp when ordering.|Y
01|30953|2|1|Daiken Hydraulic Unit complete with hoses & Selenoids.|Y
01|30955|1|1|Nikken CNC-180FAM with Fanuc Alpha 2/5000i Servo Motor.|Y
01|30955|2|1|Clamping Tail Support.  Matches center height of 180.|Y
01|30955|3|1|External Cables Power and Feed Back.  2 Meters Long.|Y
01|30955|4|1|4+1 Rotary Joint.  4 ports hydraulic 1 port Air.|Y
01|30969|1|1|Reference RGA# R-46287|Y
01|30969|3|1|Replace bearings seals and o-rings.|Y
01|30969|3|2|Labor is included.|Y
01|30982|1|1|For CNC202LSA3 S/N 1096|Y
01|30982|2|1|For CNC202LSA3 S/N 6263|Y
01|30992|1|1|Non-Cancelable & Non-Returnable|Y
01|31005|1|1|Chuck supplied with blank draw screw|Y
01|31021|1|1|Set includes the following: 2-CNCZ180LYABR tables with|Y
01|31021|1|2|sheet metal divider junction box with main cable set|Y
01|31021|1|3|B-master cables and load zone index button.|Y
01|31034|1|1|Old Part# C50-OKUMA(OH)|Y
01|31042|1|1|Delivery = 5-6 weeks (Non-returnable & non-cancelable)|Y
01|31059|2|1|HSK63A-C32-110|Y
01|31059|3|1|HSK63A-C32-115|Y
01|31079|1|1|Non-Cancelable & Non-Returnable|Y
01|31081|13|1|Part of shrink fit package deal|Y
01|31081|14|1|Part of shrink fit package deal|Y
01|31081|15|1|Part of shrink fit package deal|Y
01|31085|1|1|Reference RGA# R-46355|Y
01|31085|3|1|Replace bearings seals o-rings and positioning plate.|Y
01|31085|3|2|Labor is included.|Y
01|31115|2|1|Non-Cancelable & Non-Returnable|Y
01|31122|78|1|M8|Y
01|31124|1|1|Reference RGA# 46401|Y
01|31124|4|1|Labor Fee: $110/hour.|Y
01|31124|4|2|Labor charged is for 1.5 hours.|Y
01|31126|1|1|260MM table with Nikken AA21 control.|Y
01|31126|1|2|Includes: Table cable set control pendant M-code|Y
01|31126|1|3|cable and power cable.|Y
01|31140|2|1|HSK100 Pot Included in Machine Price|Y
01|31159|1|1|Consignment table for Tom Dang all freight charges to|Y
01|31159|1|2|be billed to Ellison|Y
01|31161|1|1|*Quoted as NET price - once stock deleted - special|Y
01|31204|5|1|Expedite Freight Fee from Nikken JP to Lyndex-Nikken|Y
01|31247|4|1|Mimatic part# 155460|Y
01|31258|48|1|*includes wrench and 2x SK16 collets of choice|Y
01|31258|48|2|*at no additional charge|Y
01|31258|56|1|Enshu ES-400 Brother TC-22B|Y
01|31270|4|1|Will advise Stock Status|Y
01|31279|1|1|Reference RGA# R-46395|Y
01|31279|2|1|Replace collet nut spindle bearings seals and|Y
01|31279|2|2|o-rings. Labor is included.|Y
01|31280|1|1|Installation includes all cables and motors|Y
01|31287|1|1|Reference RGA# R-46403|Y
01|31287|2|1|Replace collet nut bearings seals and o-rings.|Y
01|31287|2|2|Labor is included.|Y
01|31319|20|1|Quoted as 2 to 6 pieces|Y
01|31319|21|1|7+ pieces|Y
01|31343|4|1|*mod SKJ10-17/64C  17/64 Coolant Cap|Y
01|31355|1|1|UNV# 338|Y
01|31411|1|1|Okuma OKA00-20000|Y
01|31411|2|1|Okuma OK126-51000|Y
01|31412|1|1|ES700 CONRTOL BEING USE (CONFIRM MOTOR)|Y
01|31412|1|2|CNC-302 (11.9)|Y
01|31412|6|1|CNC-302OSP-M can have air or Hyd Brake|Y
01|31412|6|2|AY0200 optional air/hyd booster|Y
01|31413|1|1|CNC-321 (12.6)|Y
01|31413|1|2|CONFIRM MOTOR FOR OKUM 700M CONTROL|Y
01|31414|1|1|ES700 CONRTOL BEING USE (CONFIRM MOTOR)|Y
01|31414|1|2|CNC-302 (11.9)|Y
01|31414|6|1|CNC-302OSP-M can have air or Hyd Brake|Y
01|31414|6|2|AY0200 optional air/hyd booster|Y
01|31431|6|1|Discount reflects one-time offer to replace old damaged|Y
01|31431|6|2|unit. Offer valid on quantity of 1x PF-2 only.|Y
01|31433|3|1|Installation includes all cables and motors|Y
01|31448|1|1|Non-Cancelable & Non-Returnable|Y
01|31456|1|1|HFO Tampa to supply motor and Cable|Y
01|31456|1|2|checking availability|Y
01|31472|6|1|This line is listed at your NET cost|Y
01|31480|5|1|Direct Mount cable for A21 EMPAEMPA-N1040001|Y
01|31481|18|1|Replaces NTB1730|Y
01|31481|19|1|Replaces WP-13|Y
01|31481|20|1|B-10D 10mm Ball|Y
01|31485|1|1|HFO TO SUPPLY MOTOR AND CABLES|Y
01|31485|1|2|CHECKING AVAILABILITY|Y
01|31499|1|1|2-CNCZ180LSABR2 High Speed Tables w/R450X1 installation|Y
01|31499|1|2|kit.|Y
01|31499|2|1|2-CNCZ105LSABR2 High Speed Tables w/R450X1 installation|Y
01|31499|2|2|kit.|Y
01|31499|3|1|1-CNCZ180LSABR2 High Speed Table w/R450X1 installation|Y
01|31499|3|2|kit.|Y
01|31499|4|1|1-CNCZ105LSABR2 High Speed Table w/R450X1 Installation|Y
01|31499|4|2|kit.|Y
01|31514|5|1|Direct Mount cable for A21 EMPAEMPA-N1040001|Y
01|31524|1|1|Reference RGA# R-46435|Y
01|31524|8|1|Labor is $110.00 per hour. Labor charge is for 1.5hrs.|Y
01|31527|5|1|Direct Mount cable for A21 EMPAEMPA-N1040001|Y
01|31528|1|1|Includes cables|Y
01|31528|3|1|Expires 6/30/15 - EASTEC 2015 Special|Y
01|31531|1|1|Net Price Each|Y
01|31550|1|2|Non-Cancelable & Non-Returnable|Y
01|31550|2|2|Non-Cancelable & Non-Returnable|Y
01|31569|2|1|* Note 1 pc avail. once sold item becomes discontinued|Y
01|31570|2|1|Needle bearings are measured up to .000mm we cannot|Y
01|31570|2|2|determine the size needed for this repair until the|Y
01|31570|2|3|table has been disassembled and the existing needle|Y
01|31570|2|4|roller bearings are measured.|Y
01|31570|2|5|Should your customer need assistance when measuring|Y
01|31570|2|6|please contact Steve Harris at 847-367-4800.|Y
01|31570|7|1|10mm Ball|Y
01|31570|9|1|Replaces UE7510010|Y
01|31575|1|1|Confirmation of 4th axis in Machine|Y
01|31575|1|2|Confirmation of External cables and schematics|Y
01|31575|4|1|Confirmation if 4th axis is installed in machine|Y
01|31575|4|2|Cables to be confirmed|Y
01|31575|4|3|If 4th axis is not installed need to contact MTD|Y
01|31576|1|1|Service Call quotation for on-site repair of customer's|Y
01|31576|1|2|CNC202FA.|Y
01|31576|2|1|Transit time(round trip): 14hrs x $100.00/hr = $1400.00|Y
01|31576|2|2|Hotel: $110.00/night x 1 night = $110.00|Y
01|31576|2|3|Meals: $100.00|Y
01|31576|3|1|Minimum labor charge: 4 hours = $540.00|Y
01|31576|3|2|$135.00/hour for each additional hour.|Y
01|31576|3|3|Estimated to be an 8 hour job.|Y
01|31592|5|1|Substitute for SE1-2.8X2.1 in stock|Y
01|31603|1|1|Side Cover for 5AX-201FA|Y
01|31635|2|1|H034M6 A5|Y
01|31663|1|1|Net Price Each|Y
01|31663|1|2|Non-Cancelable & Non-Returnable|Y
01|31669|1|2|Non-Cancelable & Non-Returnable|Y
01|31669|2|2|Non-Cancelable & Non-Returnable|Y
01|31673|1|1|Reference RGA# T-46452|Y
01|31673|1|2|CNCZ180LSA3 s/n: 7013|N
01|31673|5|1|Freight charges for picking up customer's CNCZ180LSA3|Y
01|31673|5|2|s/n: 7013 for evaluation.  This is not a warranty|Y
01|31673|5|3|repair.  Customer is responsible for all freight|Y
01|31673|5|4|charges.  Reference RGA# T-46452.|Y
01|31675|20|1|1x WW-CN171R003 *Old Style*|Y
01|31693|1|1|Non-Cancelable & Non-Returnable|Y
01|31695|1|2|Non-Cancelable & Non-Returnable|Y
01|31695|2|2|Non-Cancelable & Non-Returnable|Y
01|31725|1|1|Arbor Screw for BT45-FMD38.1-60|Y
01|31742|1|1|Delivery will be 2-3 weeks from the receipt of a|Y
01|31742|1|2|Purchase order.|Y
01|31742|1|3|Freight has not been quoted but will be added once|Y
01|31742|1|4|determined.|Y
01|31756|1|1|180MM High Speed table with installation kit for TC-S2B|Y
01|31772|11|1|Balance in about 3 weeks|Y
01|31777|1|1|Net Price Each|Y
01|31819|1|1|Service call performed by Armando Mena on customer's|Y
01|31819|1|2|5AX-150FA-M s/n: 2002 on 6/2/15 and 6/4/15.|Y
01|31819|3|1|Transit Time: 5.5hrs x $100.00/hr = $550.00|Y
01|31819|6|1|TCE-A4141(2)-J1 Feedback wireharness|Y
01|31840|1|1|Reference RGA# R-46500|Y
01|31843|1|1|*older generation|Y
01|31843|2|1|*older generation|Y
01|31868|2|1|*2pots included w/ purchase of machine|Y
01|31901|1|1|Non-Cancelable & Non-Returnable|Y
01|31902|1|1|Part # MSA01-33012|Y
01|31902|1|2|Replacement spindle shaft for Part # MNL12-SM10X|Y
01|31928|3|1|Balance to 20000 rpm's|Y
01|31928|5|1|Balanced to 10000 rpm's|Y
01|31955|3|1|This line is listed at your NET cost|Y
01|31956|1|1|Reference RGA# R-46478|Y
01|31956|6|1|Reference RGA# R-46478|Y
01|31967|1|1|Balance in 1-2 weeks|Y
01|31970|1|1|Tooling Certificate Number: 13170-604-040715RT|Y
01|31977|1|1|*older generation|Y
01|31977|2|1|*older generation|Y
01|31984|1|1|Older generation - added feature:|Y
01|31984|1|2|pre-balanced/balanceable|Y
01|32000|1|1|Reference RGA# T-46461|Y
01|32016|1|1|200MM 4th and 5th axis table with Mitsubishi motors|Y
01|32016|2|1|200MM 4th and 5th axis table without Mitsubishi motors|Y
01|32019|1|1|260MM Indexer with AA21 controller cables power cord|Y
01|32019|1|2|M-code cable and pendant included.|Y
01|32019|2|1|320MM table with Nikken Alpha 21 control.|Y
01|32019|2|2|Includes: Table with motor external cable set M-code|Y
01|32019|2|3|cable power cable and pendant for programming.|Y
01|32019|2|4|Air/hydraulic booster for brake system.|Y
01|32027|1|1|Reference RGA# R-46462|Y
01|32027|3|1|Replace all bearings seals and o-rings.|Y
01|32030|3|1|Non-Cancelable & Non-Returnable|Y
01|32048|1|1|For NHX500 Mori|Y
01|32048|2|1|For 1035 Eco Mori|Y
01|32050|1|1|Start-2 Shrink Fit machine includes 2pc of CAT40 Pot.|Y
01|32050|1|2|Start-2 Shrink Fit machine is 200V 3-phase 30amp.|Y
01|32050|1|3|Start-2 Shrink Fit machine includes 1 air cooling tower|Y
01|32069|1|1|Balance in 2-3 weeks|Y
01|32070|1|1|Normal discount is 25% additional discount quoted|Y
01|32070|1|2|to not send in customer's damaged C5005-0875-5.66.|Y
01|32072|1|1|90-Day Consignment to Hwacheon.  Please issue a PO for|Y
01|32072|1|2|$0.00.  Should Hwacheon recieve an order for the table|Y
01|32072|1|3|Hwacheon will pay the price on this quote.|Y
01|32073|1|1|Quoted 1 or 2 pieces|Y
01|32073|2|1|Quoted 3 or 4 pieces|Y
01|32073|3|1|Quoted 5 or 6 pieces|Y
01|32073|4|1|Quoted 1 or 2 pieces.|Y
01|32073|5|1|Quoted 3 or 4 pieces.|Y
01|32073|6|1|Quoted 5 or 6 pieces|Y
01|32085|1|1|130MM 4th and 5th axis table with backhand motor|Y
01|32085|2|1|180MM High Speed table with left hand motor|Y
01|32091|1|1|Balance ETA 2-3 weeks|Y
01|32107|2|1|Non-Cancelable & Non-Returnable|Y
01|32107|3|1|Non-Cancelable & Non-Returnable|Y
01|32125|1|1|This item is listed at your NET cost|Y
01|32128|1|1|Discount reflects one-time offer to replace old|Y
01|32128|1|2|damaged holders instead of sending them in for repair.|Y
01|32128|1|3|Offer valid on quantity of 2 HSK63A-C3/4-110G only.|Y
01|32150|2|1|A2-6 Adapter plate|Y
01|32159|1|1|SF-COOLING-WIRE 3.5mm Power wire for cooling unit.|Y
01|32164|1|1|We currently have 6-pcs in stock 7-pcs 1 to 2 weeks|Y
01|32164|1|2|Balance of 17 pcs 13 weeks upon receipt of order|Y
01|32200|6|1|Price on line#3 is @ NET|Y
01|32219|1|1|This item is listed at your NET cost.|Y
01|32240|3|1|Modification = Special Block made in house @ Net charge|Y
01|32243|2|1|General Dynamics will not accept modified milling chk.|Y
01|32246|1|1|Delivery =|Y
01|32246|2|1|A2-6 Adapter Plate|Y
01|32246|2|2|Delivery = 3-4 Weeks from dte of Order|Y
01|32250|2|1|General Dynamics will not accept modified milling chk.|Y
01|32251|1|1|Reference RGA# R-46192|Y
01|32251|4|1|Labor is $110.00/hour. Assesed is amount for 1.5 hours.|Y
01|32251|11|1|Labor is $110.00/hour assesed is labor for 1.5 hours.|Y
01|32253|2|1|H018M8 A6 (Adapter Plate)|Y
01|32253|3|1|JFB-2556 (Adapter Plate)|Y
01|32253|4|1|JFB-2557 - Drawtube Mazak QTU-250MY|Y
01|32253|4|2|(A2-6 M60 x 2P) Howa H018M8 (M50 x 1.5P)|Y
01|32271|1|1|Delivery = 10 business days|Y
01|32271|2|1|Delivery = 10 business days|Y
01|32271|5|1|Delivery = 25 business days|Y
01|32271|8|1|Delivery = 25 business days|Y
01|32271|9|1|Delivery = 25 business days|Y
01|32271|11|1|Delv = production will be completed at the end of July|Y
01|32271|12|1|Delivery = 10 business days|Y
01|32281|1|1|69mm gl|Y
01|32281|2|1|*qty break|Y
01|32288|9|1|Price includes 10 CAT40 SF holders of the customers|Y
01|32288|9|2|choice from selected holders.|Y
01|32298|1|1|Reference RGA# R-46505|Y
01|32298|3|1|Collet nut bearings seals and o-rings must be|Y
01|32298|3|2|replaced.|Y
01|32358|4|1|Full interface and instalation to a Makino PS-95 with|Y
01|32358|4|2|Fanuc OimD control.  Installation includes amplifiers|Y
01|32358|4|3|drive boards external cables travel and all labor.|Y
01|32370|3|1|*2pc Qty Break Pricing|Y
01|32390|5|1|Price reflects NET charge|Y
01|32401|19|1|Complete T-Axis Table Replacement|Y
01|32401|19|2|Tilt Axis body is beyond repair|Y
01|32401|20|1|Replacement Rotary Joint for Table|Y
01|32406|1|1|Special one time pricing for Hales Machine deal|Y
01|32418|2|1|TC0875-10 #10 Spring|Y
01|32418|3|1|TC0875-09: #9 Spring|Y
01|32427|31|1|NON-CANCELABLE & NON-RETURNABLE|Y
01|32427|32|1|NON-CANCELABLE & NON-RETURNABLE|Y
01|32427|33|1|NON-CANCELABLE & NON-RETURNABLE|Y
01|32427|34|1|NON-CANCELABLE & NON-RETURNABLE|Y
01|32440|1|1|Non-Cancelable & Non-Returnable|Y
01|32443|1|1|Net Price Each|Y
01|32443|1|2|Non-Cancelable & Non-Returnable|Y
01|32443|2|1|Net Price Each|Y
01|32443|2|2|Non-Cancelable & Non-Returnable|Y
01|32479|3|1|Price Reflect Net Charge|Y
01|32479|6|1|Price relects Net Charge|Y
01|32480|2|1|Quoted as NET price|Y
01|32488|1|1|Nikken 10 Rotary table with Mitsubishi Motor.|Y
01|32488|1|2|Exact Motor Specification to be determined.|Y
01|32488|2|1|Nikken Manual Tail Stock.  Matches center height of 260|Y
01|32488|3|1|Free $1000 tooling certificate.  Good for list price|Y
01|32488|3|2|tool holders.|Y
01|32488|4|1|25 meter Power & Signal cable.  To be specified!|Y
01|32488|5|1|2.5 meter Feedback cable.  To be specified|Y
01|32492|1|1|130MM twin spindle table with 170MM pitch|Y
01|32492|1|2|Backhand mounted motor and risers for greater tilt|Y
01|32492|1|3|Change the tilting range from -30 to +140 degrees|Y
01|32492|1|4|Direct mount cables included|Y
01|32500|3|1|TCD-21188: 3+1 Port Rotary Joint CNC180|Y
01|32500|4|1|TCD-37069: 4 Port Rotary Joint for TAT-170|Y
01|32502|1|1|100MM twin spindle high speed table with motor|Y
01|32502|2|1|100MM four spindle high speed table with motor|Y
01|32502|3|1|100MM three spindle high speeed table with motor|Y
01|32502|3|2|This table is used and reconditioned comes with full|Y
01|32502|3|3|warranty|Y
01|32502|4|1|5C pneumatic cylinder set with threaded nose pcs|Y
01|32502|4|2|and hand lever|Y
01|32590|1|1|Non-Cancelable & Non-Returnable|Y
01|32618|1|1|Reference RGA# R-46472|Y
01|32618|3|1|Replace bolts and missing flange hardware.|Y
01|32640|1|1|Service call performed by Armando Mena on customer's|Y
01|32640|1|2|5AX-150FA-M s/n: 2002 on 6/2/15 and 6/4/15.|Y
01|32640|3|1|Transit Time: 5.5hrs x $100.00/hr = $550.00|Y
01|32640|6|1|TCE-A4141(2)-J1 Feedback wireharness|Y
01|32660|1|1|180404 Positioning Pin|Y
01|32695|1|1|10% Promo|N
01|32727|1|1|Reference RGA# R-46552|Y
01|32727|3|1|Drive shaft collet nut locating boss bearings seals|Y
01|32727|3|2|and o-rings need to be replaced.|Y
01|32727|3|3|Labor charge is included.|Y
01|32759|2|1|*2x holder pots come w/ machine at n/c|Y
01|32769|7|1|*pre-balanced and balanceable|Y
01|32769|8|1|*pre-balanced and balanceable|Y
01|32772|1|1|Nikken 10 Rotary Table with Fanuc Motors.|Y
01|32772|2|1|Installation and interface to a Doosan DNM-500 with|Y
01|32772|2|2|Fanuc Control.  Inatallation includes amplifiers drive|Y
01|32772|2|3|boards cables travel and labor.|Y
01|32772|3|1|Good for list price Tool Holders.|Y
01|32789|1|1|Discount reflects one-time offer to replace old damaged|Y
01|32789|1|2|point finders instead of sending them in for repair.|Y
01|32789|1|3|Offer valid on quantity of 2 PF-2 only.|Y
01|32821|1|1|200MM 4th & 5th axis table with Haas motor & cables set|Y
01|32821|1|2|with pneumatic brake system|Y
01|32827|1|1|This item reflects net price.|Y
01|32829|1|1|Discount reflects one-time offer to replace old damaged|Y
01|32829|1|2|holder instead of sending them in for repair.|Y
01|32829|1|3|Offer valid on quantity of 1 CAT50-C1-105U only.|Y
01|32841|1|1|Non-Cancelable & Non-Returnable|Y
01|32841|1|2|Net Price Each|Y
01|32847|1|1|Net Price Each|Y
01|32847|1|2|Only 2p in stock|Y
01|32847|1|3|Non-Cancelable & Non-Returnable|Y
01|32853|1|1|Tooling Certificate Number:  20275-569-021215RT|Y
01|32937|1|1|Non-Cancelable & Non-Returnable|Y
01|32976|1|1|This is a non standard item|Y
01|32976|1|2|Non-Cancelable & Non-Returnable|Y
01|32976|1|3|Net Price Each|Y
01|32981|1|1|Non-Cancelable & Non-Returnable|Y
01|33010|2|1|This line is included in the price of the SF unit|Y
01|33019|1|1|Non-Cancelable & Non-Returnable|Y
01|33019|2|1|Non-Cancelable & Non-Returnable|Y
01|33027|2|1|6-Weeks for installation|Y
01|33070|1|1|Discount reflects one-time pricing to replace old|Y
01|33070|1|2|tooling instead of sending for repair.|Y
01|33085|1|1|PBA-170 with MT3 Adapter|Y
01|33107|1|1|MNL12-BG12Z-MST - replacement plate & set screws|Y
01|33124|1|1|B/O ETA 1-2 Weeks|Y
01|33124|2|1|Balance ETA 1-2 Weeks|Y
01|33150|1|1|Quoted as 1 to 5 pieces.|Y
01|33150|2|1|Quoted 6 to 10 pieces.|Y
01|33150|3|1|Quote as 11+ reamers.|Y
01|33175|7|1|This line at no charge as a courtesy to the customer|Y
01|33196|3|1|Quoted as net price.|Y
01|33197|14|1|4-degree|Y
01|33203|1|1|Reference RGA# R-46572|Y
01|33203|4|1|CR2032: Cell Battery|Y
01|33233|1|1|Discount reflects core trade in.|Y
01|33237|1|1|Discount reflects one-time offer to replace damaged|Y
01|33237|1|2|holder instead of sending in for repair.|Y
01|33248|1|1|180MM High Speed table with HFT105 motor|Y
01|33248|3|1|16C pneumatic collet closer with nose piece draw bar|Y
01|33248|3|2|air lines and toggle switch.|Y
01|33270|1|1|Quoted as 1 to 5 pieces.|Y
01|33270|2|1|Quoted 6 to 10 pieces.|Y
01|33270|3|1|Quote as 11+ reamers.|Y
01|33309|1|1|Quoted at a net price includes air freight.|Y
01|33324|6|1|Machine is Mori DV5100 with Fanuc 0im control|Y
01|33324|6|2|4 + 1 installation|Y
01|33328|3|1|Same wrenches used on both tools|Y
01|33341|1|1|Discount reflects one-time offer to replace damaged|Y
01|33341|1|2|holders.  Should customer decide to send in the|Y
01|33341|1|3|damaged holders this quotation is no longer valid.|Y
01|33345|5|1|Custom stopping block|Y
01|33345|6|1|Installation labor and expenses.|Y
01|33350|1|1|Non-Cancelable & Non-Returnable|Y
01|33410|1|1|Reference RGA# R-46609|Y
01|33410|9|1|Labor is $110/hour. Price reflects 3.5 hours of labor.|Y
01|33476|1|1|Non-Cancelable & Non-Returnable|Y
01|33476|2|1|Non-Cancelable & Non-Returnable|Y
01|33485|1|1|Non-Cancelable & Non-Returnable|Y
01|33485|2|1|Non-Cancelable & Non-Returnable|Y
01|33507|1|1|Net Price Each|Y
01|33507|1|2|Non-Cancelable & Non-Returnable|Y
01|33507|2|1|Net Price Each|Y
01|33507|2|2|Non-Cancelable & Non-Returnable|Y
01|33516|2|1|*PRO*|Y
01|33524|4|1|Net Price Each|Y
01|33524|4|2|Non-Cancelable & Non-Returnable|Y
01|33540|1|1|ABOVE TABLE INCLUDES TCD-56013 4+1 ROTARY UNION|Y
01|33540|1|2|CONFIRMATION OF MACHINE NEEDED FOR INTERFACE|Y
01|33540|1|3|INSTALLATION 4+1 CONFIGURATION|Y
01|33552|1|1|Reference RGA# R-46589|Y
01|33552|4|1|9 Volt Battery|Y
01|33580|1|1|Reference RGA# T-46623|Y
01|33580|36|1|5AX201FAM conversion to Fanuc motor and wireharness|Y
01|33580|37|1|Installation: 5AX-201FAM to Makino S33|Y
01|33580|37|2|Includes: Dual axis drive unit short bar fiber optic|Y
01|33580|37|3|cables communications cables bulkhead cables|Y
01|33580|37|4|external cables & service time and travel.|Y
01|33584|1|1|Discount reflects one-time price to replace 2 damaged|Y
01|33584|1|2|tap holders instead of sending in for repair.|Y
01|33590|2|1|Air frieght for HW-10C-COL from Japan - 125lbs|Y
01|33602|1|1|*Bakers Dozen Promo|Y
01|33609|1|1|*Bakers Dozen Promo|Y
01|33614|2|1|Net Price Each|Y
01|33614|2|2|Non-Cancelable & Non-Returnable|Y
01|33614|3|1|Net Price Each|Y
01|33614|3|2|Non-Cancelable & Non-Returnable|Y
01|33614|4|1|Net Price Each|Y
01|33614|4|2|Non-Cancelable & Non-Returnable|Y
01|33621|1|1|Quoted as 1 to 2 pieces|Y
01|33621|2|1|Quoted 1 to 2 pieces|Y
01|33621|4|1|Quote 3+ pieces|Y
01|33621|5|1|Quote 3+ pieces|Y
01|33622|1|1|Discount reflects one-time offer to replace damaged|Y
01|33622|1|2|holder instead of sending it in for repair.|Y
01|33622|1|3|Should the customer choose to send in the old holder|Y
01|33622|1|4|for repair this quotation will no longer be valid.|Y
01|33671|1|1|1 stock/5 pc= Pending|Y
01|33671|2|1|3 stock/3 pc= Pending|Y
01|33671|3|1|2 pc Stock/ 4 pc= Pending|Y
01|33678|1|1|*Bakers Dozen Promo|Y
01|33679|1|1|Non-Cancelable & Non-Returnable|Y
01|33682|3|1|This line is listed at your NET cost|Y
01|33710|1|1|RGA# R-46619|Y
01|33711|1|1|Non-Cancelable & Non-Returnable|Y
01|33714|1|1|200MM 4th and 5th axis table with Fanuc motors|Y
01|33714|2|1|Installation:Dual axis drive bulkhead cablesshort bar|Y
01|33714|2|2|external cables communications cables I.O's fiber|Y
01|33714|2|3|optic cables  axis expansion card parameter changes|Y
01|33714|2|4|service time and travel.|Y
01|33717|2|1|This line is listed at your NET cost|Y
01|33725|3|1|**without clamping screw|Y
01|33727|2|1|Installation: Dual axis drive bulkhead cables I.Os|Y
01|33727|2|2|external cables communications cables fiber optic|Y
01|33727|2|3|axis expansion card parameter changes service time|Y
01|33727|2|4|and travel.|Y
01|33728|1|1|RFQ# HURQ47052|Y
01|33728|2|1|RFQ# HURQ47052|Y
01|33728|4|1|RFQ# HURQ47042|Y
01|33737|4|1|Modify C5011-1000-4.00 to facilitate coolant through|Y
01|33737|4|2|the sides.|Y
01|33774|1|1|Reference RGA# R-46656|Y
01|33774|3|1|Bearings seals and o-rings must be replaced.|Y
01|33774|3|2|Spindles need resurfacing.|Y
01|33776|1|1|O-Ring for SKJ25-5/8C|Y
01|33794|1|1|Reference RGA# T-46634|Y
01|33794|1|2|5AX-200II s/n: 1524|N
01|33815|1|1|Estimated repair of customer's CNC401 s/n: 9562|Y
01|33821|1|1|Service call for 2 days at Halliburton TX.|Y
01|33821|1|2|This is a rough estimate actual charges will not|Y
01|33821|1|3|be known until the completion of Service Call.|Y
01|33821|3|1|Airfare and Car Rental: $600.00|Y
01|33821|3|2|Transit Time: 16hrs x $100.00 per hour = $1600.00|Y
01|33821|3|3|Hotel: $150.00 per night x 2 nights = $300.00|Y
01|33821|3|4|Meal Expense: $75.00 per day x 2 days = $150.00|Y
01|33821|6|1|Minimum labor charge is 6 hours.  Additional labor|Y
01|33821|6|2|will be charged per hour.|Y
01|33823|4|1|$10/net with the purchase of a matching holder|Y
01|33829|1|1|Tooling Certificate Number: 13485-647-063015|Y
01|33829|25|1|**$10.00 net special pricing|Y
01|33834|1|1|Balance in 3 Weeks|Y
01|33834|2|1|Balance in 3 Weeks|Y
01|33863|1|1|Note that this line is listed at your NET cost|Y
01|33868|1|1|*3 coolant port holes|Y
01|33871|1|1|Non-Cancelable & Non-Returnable|Y
01|33882|1|1|Tooling Certificate Number: 13687-641-061515|Y
01|33929|1|1|Reference RGA# R-46626|Y
01|33931|1|1|Balance in 14 weeks|Y
01|33933|3|1|Includes: Bulk head cable set External cables set|Y
01|33933|3|2|parameter changes service time & travel|Y
01|33933|3|3|For a Duravertical|Y
01|33934|2|1|Includes: Dual axis drive unit bulk head cable sets|Y
01|33934|2|2|external cable sets axis expansion card IO's|Y
01|33934|2|3|parameter changes service time & travel|Y
01|33934|2|4|For a Duravertical|Y
01|33938|5|1|INSTALLATION 4TH AXIS COMPLETE INCLUDING ALL HARDWARE|Y
01|33938|5|2|MACHINE HWACHEON VESTA 1000 W/FANUC 0imd control|Y
01|33974|1|1|Air/Hyd Tailstock 135MM Center Height with MT3 center|Y
01|33974|1|2|socket.|Y
01|33978|3|1|Special Yellow Heavy Duty Cable|Y
01|33978|4|1|Special Yellow Heavy Duty Cable|Y
01|33985|1|1|Reference RGA# R-46637|Y
01|33999|1|1|Reference RGA# T-46653|Y
01|33999|1|2|5AX-130 s/n: 3749|N
01|33999|5|1|One-Time Courtesy testing and adjustment of backlash.|Y
01|33999|5|2|Accuracy Report attached.|Y
01|34009|1|1|Reference RGA# T-46676|Y
01|34009|1|2|TAT-105 s/n: 1447|N
01|34009|13|1|8.0mm balls|Y
01|34041|1|1|Special Closeout Pricing (Old Style)|Y
01|34041|2|1|Special Closeout Pricing (Old Style)|Y
01|34041|3|1|Normal Delaware Pricing (New Style)|Y
01|34042|1|1|Reference RGA# R-46675|Y
01|34042|1|2|HP-150|Y
01|34048|1|1|Part # 180707|Y
01|34060|7|1|Special Positioning Block Provided by Lyndex-Nikken|Y
01|34060|8|1|This line at no charge.|Y
01|34060|9|1|This line at no charge.|Y
01|34068|4|1|Delivery is pending at this time.|Y
01|34069|5|1|Package price|Y
01|34078|1|1|RGA# T-46647|Y
01|34078|50|1|Rotary Axis Power Wire Harness Cable|Y
01|34078|51|1|Rotary Axis Feedback Wire Harness Cable|Y
01|34078|52|1|Tilt Axis Power Wire Harness Cable|Y
01|34078|53|1|Tilt Axis Feedback Wire Harness Cable|Y
01|34078|55|1|Expedite fee is to expedite parts currently on|Y
01|34078|55|2|backorder and repairs to be completed 2-3 after the|Y
01|34078|55|3|receipt of backordered parts.|Y
01|34082|2|1|Coolant Through the tool|Y
01|34082|2|2|Coolant Through the flange DIN|Y
01|34082|2|3|Exit Port Location in meat of pilot|Y
01|34096|3|1|Installation: Inludes drvie unit external cables set|Y
01|34096|3|2|parameter changes service time and travel.|Y
01|34096|4|1|Installation Kit: Includes drive unit external cables|Y
01|34096|4|2|Yamazen is responsible for the installation.|Y
01|34105|1|1|Budgetary repair of 5AX-2MT-225-304.8 S/N 1229|Y
01|34105|1|2|Price for repair is subject to change if table is sent|Y
01|34105|1|3|in for repair.|Y
01|34105|44|1|PART # TC55674 - Oil Seal|Y
01|34108|3|1|4 stock/ 1 pc 5 weeks|Y
01|34140|1|1|Reference RGA# T-46235|Y
01|34141|2|1|Spanner wrench for ER32 collet nut on live tool|Y
01|34141|3|1|Spindle wrench for live tool|Y
01|34173|1|1|Reference RGA# T-46677|Y
01|34173|1|2|CNC250LOSP s/n: 4287|N
01|34180|2|1|This line at no charge as a courtesy to the customer|Y
01|34180|3|1|This line at no charge as a courtesy to the customer|Y
01|34188|1|1|180MM High Speed Table with left hand mounted motor for|Y
01|34188|1|2|Brother TCS2D.|Y
01|34188|4|1|$1000.00 Free Tooling Promotion|Y
01|34190|1|1|One Piece Stock - While Quantity Last|Y
01|34208|1|1|Non-Cancelable & Non-Returnable|Y
01|34208|2|1|Non-Cancelable & Non-Returnable|Y
01|34259|1|1|Reference RGA# R-46503|Y
01|34259|3|1|Labor charge for inspection cleaning re-greasing and|Y
01|34259|3|2|re-assembly.|Y
01|34274|1|1|Tooling Certificate Number: 8112-642-061915|Y
01|34284|1|1|One-Time discount to have 3x damaged tools replaced|Y
01|34284|1|2|instead of repaired.|Y
01|34290|1|1|This item is listed at your NET cost|Y
01|34294|3|1|Mazak cable set: Wiring Diagram to be provided by MSI|Y
01|34295|3|1|If required|Y
01|34295|8|1|Service call to install new parameters|Y
01|34306|1|1|Non-Cancelable & Non-Returnable|Y
01|34359|11|1|This line is listed at your NET cost|Y
01|34359|12|1|This line is listed at your NET cost|Y
01|34375|4|1|Direct mount cables from motor to cabinet|Y
01|34400|1|1|Reference RGA# T-46648|Y
01|34400|38|1|TC100X120X12: Oil Seal|Y
01|34404|2|1|This is a net charge for Lyndex-Nikken to design and|Y
01|34404|2|2|manufacture a positioning block per a customer provided|Y
01|34404|2|3|spindle drawing.|Y
01|34407|1|1|Reference RGA# T-46694|Y
01|34407|1|2|CNC250 s/n: 4330|N
01|34408|1|1|Reference RGA# T-46695|Y
01|34413|1|1|Reference RGA# T-46685|Y
01|34424|2|1|*net price|Y
01|34424|2|2|*PB designed and manufactured by Lyndex-Nikken upon|Y
01|34424|2|3|receipt of spindle drawing of machine|Y
01|34424|12|1|Will advise price and delivery asap|Y
01|34426|6|1|Modification of CAT50-SK16-165U X2 to CAT50-SK16F-165U|Y
01|34428|4|1|*net price|Y
01|34428|4|2|*PB designed and manufactured by Lyndex-Nikken upon|Y
01|34428|4|3|receipt of spindle drawing of machine|Y
01|34459|3|1|5/8 id 3.94 gl  27mm diameter at end|Y
01|34488|3|1|Balance ETA 2-3 weeks|Y
01|34494|1|1|Reference RGA# T-46756|Y
01|34494|1|2|5AX-201FA-MA-B s/n: 4216|N
01|34494|9|1|Replaces WP-13|N
01|34494|17|1|Guarantees expedited evaluation and repair.|Y
01|34494|17|2|Repairs will be completed and ready to ship in 2-3|Y
01|34494|17|3|business days as opposed to 7-10 business days.|Y
01|34515|7|1|4 pcs 2 weeks/ 1 pc 5 weeks|Y
01|34517|1|1|Tooling Certificate Number: 3690-649-070615RT|Y
01|34528|2|1|BUCK 8 INCH 6 JAW STEEL SCROLL CHUCK WITH ADJUST TRUE|Y
01|34528|2|2|CAPABILITY AND 2 PIECE TONGUE AND GROOVE MASTER JAWS.|Y
01|34528|2|3|ADAPTER TO FIT CNC-260 Rotary Table|Y
01|34528|2|4|(2) SET OF 3 SOFT TOP JAW FOR 8 Chuck|Y
01|34528|3|1|BUCK 6 INCH 6 JAW STEEL SCROLL CHUCK WITH ADJUST TRUE|Y
01|34528|3|2|CAPABILITY AND 2 PIECE TONGUE AND GROOVE MASTER JAWS.|Y
01|34528|3|3|ADAPTER TO FIT TAT-170 Support Table|Y
01|34528|3|4|(2) SET OF 3 SOFT TOP JAW FOR 6 Chuck|Y
01|34531|1|1|CNC-260AA21 IS WITH INDEPENDENT CONTROLLER|Y
01|34531|1|2|CNC-260FA-M NEEDS 4TH AXIS INTERFACE|Y
01|34531|2|1|MACHINE MUST HAVE SPARE M CODES FOR CONTROLLER|Y
01|34531|4|1|Includes: Bulk head cable set AMPLIFIER HARDWARE|Y
01|34531|4|2|parameter changes service time & travel|Y
01|34531|4|3|Machine is a NV5000A w/18iMB control|Y
01|34557|1|1|Reference RGA# R-46711|Y
01|34557|3|1|All bearings seals and o-rings need to be replaced.|Y
01|34557|3|2|Replace damaged CAT40 Spindle|Y
01|34557|3|3|Replace damaged ER20 Spindle|Y
01|34575|1|1|Ext Power Cable Rotary 5AX-201FA-M|Y
01|34575|2|1|Ext Feedback Cable Rotary 5AX-201FA-M|Y
01|34575|3|1|Ext Power Cable Tilt 5AX-201FA-M|Y
01|34575|4|1|Ext Feedback Cable Tilt 5AX-201FA-M|Y
01|34575|5|1|Power Cable CNCZ202FAM|Y
01|34575|6|1|Feedback Cable CNCZ202FAM|Y
01|34580|4|1|Installation & Interface|Y
01|34580|8|1|10 SCROLL CHUCK WITH ADAPTER PLATE|Y
01|34585|2|1|CNC-EXT-CABLE-R-ST|Y
01|34585|2|2|cable set upto 10ft|Y
01|34585|4|1|FANUC 5th AXIS CARD|Y
01|34585|5|1|Installation & Interface for Fanuc 0iMD (both Axis)|Y
01|34585|5|2|Price including Fanuc Part Labor & travel expense|Y
01|34611|1|1|180MM High Speed table with Haas motor and cable set|Y
01|34614|1|1|Reference RGA# T-46648|Y
01|34615|4|1|Special 10-20ft long cable set for bridge center|Y
01|34616|2|1|Reference RGA# R-46727|Y
01|34616|3|1|Spindle and collet nut need to be replaced.|Y
01|34616|3|2|Bearings seals and o-rings need to be replaced.|Y
01|34616|3|3|Labor is included.|Y
01|34616|6|1|Reference RGA# R-46727|Y
01|34616|7|1|Collet nut needs to be replaced.|Y
01|34616|7|2|Bearings seals and o-rings need to be replaced.|Y
01|34616|7|3|Labor is included.|Y
01|34630|1|1|200MM 4th & 5th axis table with special rustproof|Y
01|34630|1|2|coating motor and cables to be provided by Current EDM|Y
01|34634|1|1|(Shrink Fit Cat40 Tooling Package- Includes 10 3.15|Y
01|34634|1|2|gage length holders Cat40 non coolant) mixed gage|Y
01|34634|1|3|length and styles can be quoted.|Y
01|34636|1|1|130MM twin spinlde table with 250MM pitch including|Y
01|34636|1|2|direct mount cables and Fanuc motors.|Y
01|34638|1|1|1 stock/ 3 pcs 2 weeks|Y
01|34639|5|1|Bulkhead cable set|Y
01|34639|6|1|Installation includes: Bulkhead cable set external|Y
01|34639|6|2|cables parameter changes service time and travel|Y
01|34647|3|1|Includes shipping from Lyndex-Nikken to/from Fryers|Y
01|34647|3|2|Fryers mounting the motor and cables and testing|Y
01|34647|3|3|Lyndex-Nikken to install|Y
01|34647|6|1|Includes shipping from Lyndex-Nikken to/from Fryers|Y
01|34647|6|2|Fryer mount the motor and cable set and test the table|Y
01|34647|6|3|Lyndex-Nikken to install|Y
01|34647|8|1|4 jaw scroll chuck 7-814-100 with adapte plate|Y
01|34654|1|1|Non-Cancelable & Non-Returnable|Y
01|34654|2|1|Non-Cancelable & Non-Returnable|Y
01|34660|1|1|Service completed on 7/9 by Armando Mena|Y
01|34660|3|1|Transit Time of 8 hours x $100.00/hr = $800.00|Y
01|34660|3|2|Food: $27.20|Y
01|34660|4|1|Minimum Service Charge 4 Hours x $135.00/hr = $540.00|Y
01|34662|1|1|Net Price Each|Y
01|34662|1|2|Non-Cancelable & Non-Returnable|Y
01|34668|7|1|3 pcs 5 stock/ more 4 pcs. 13 weeks|Y
01|34697|2|1|Reference RGA# Q-46680|Y
01|34697|3|1|Collet nut bearings seals and o-rings are worn|Y
01|34697|3|2|and need to be replaced. Labor is included.|Y
01|34697|7|1|Collet nut bearings seals and o-rings are worn|Y
01|34697|7|2|and must be replaced. Labor is included.|Y
01|34697|11|1|Collet nut bearings seals and o-rings are worn|Y
01|34697|11|2|and must be replaced. Labor is included.|Y
01|34716|7|1|Checking stock on all the above|Y
01|34717|1|1|3600 RPM|Y
01|34717|4|1|High Speed Type of NK103-10000 6000 RPM|Y
01|34718|9|1|Checking stock on all the above|Y
01|34721|2|1|Balance ETA 2 weeks|Y
01|34731|1|1|Discount is a one time courtesy to replace damaged|Y
01|34731|1|2|holder instead of sending in for evaluation.|Y
01|34733|1|1|Tooling Certificate Number: 5410-661-072715|Y
01|34771|1|1|Discount is a one-time discount to have customer|Y
01|34771|1|2|replace damaged unit instead of sending in for repair.|Y
01|34771|1|3|Should you opt to send in the damaged unit this|Y
01|34771|1|4|will no longer be valid.|Y
01|34774|1|1|Reference RGA# R-46724|Y
01|34774|3|1|Collet nut bearings seals and o-rings must be|Y
01|34774|3|2|replaced. Labor is included.|Y
01|34794|1|1|Reference RGA# T-46624|Y
01|34799|3|1|$1000.00 Free Tooling Promotion|Y
01|34812|2|1|Installation includes:Drive unit bulkhead cables|Y
01|34812|2|2|external cable set parameter changes service time|Y
01|34812|2|3|and travel. The 4th axis software option must be turned|Y
01|34812|2|4|on before installation can begin.|Y
01|34816|1|1|200MM 4th and 5th axis table with pnuematic brake|Y
01|34816|1|2|HFO showroom model|Y
01|34819|3|1|This line is listed at your NET cost|Y
01|34827|1|1|Delivery will be 4-5 weeks.|Y
01|34840|1|1|NET PRICE EACH|Y
01|34840|1|3|Non-Cancelable & Non-Returnable|Y
01|34842|1|1|Reference RGA# R-46466|Y
01|34877|1|1|For Haas VF-3|Y
01|34877|1|2|Sigma 5 Motors|Y
01|34877|1|3|Hydraulic Brake|Y
01|34877|2|1|Cable Set for Haas VF-3|Y
01|34886|1|1|This is not a standard stock item and is listed at your|Y
01|34886|1|2|Net cost.|Y
01|34888|1|1|Electrical Cable connects motor to machine.|Y
01|34888|1|2|Delivery is 4-5 weeks|Y
01|34889|1|1|Reference RGA# T46752|Y
01|34889|1|2|5AX-130ZA s/n: 3584|N
01|34890|1|1|Non-Cancelable & Non-Returnable|Y
01|34898|2|1|1 pc in refurbished inventory.|Y
01|34898|3|1|2 more pcs in 5-7 business days.|Y
01|34906|1|1|Reference RGA# T-46754|Y
01|34906|1|2|CNC202A21 s/n: 1196|N
01|34908|1|1|Tooling Certificate Number:|Y
01|34908|1|2|25000-633-052115RT|Y
01|34908|1|3|25000-659-072415RT|Y
01|34935|1|1|Includes: 180MM rotry table Alpha 21 control M-code|Y
01|34935|1|2|cable pendant and power cable.|Y
01|34941|1|1|Non-Cancelable & Non-Returnable|Y
01|34942|1|1|Non-Cancelable & Non-Returnable|Y
01|34962|1|1|Estimate for repair of a CNC260.|Y
01|34967|1|1|Reference RGA# R-46763|Y
01|34967|3|1|Bearings seals and o-rings are worn and must be|Y
01|34967|3|2|replaced.|Y
01|34976|1|1|Non-Cancelable & Non-Returnable|Y
01|34981|3|1|*net price|Y
01|34981|3|2|*PB designed and manufactured by Lyndex-Nikken upon|Y
01|34981|3|3|receipt of spindle drawing of machine|Y
01|34986|1|1|Balance in 10 weeks|Y
01|34992|3|1|Includes: Dual axis drive unit bulk head cable sets|Y
01|34992|3|2|external cable sets axis expansion card IO's|Y
01|34992|3|3|parameter changesservice time and travel|Y
01|34992|3|4|For a DuraVertical 5100|Y
01|34992|4|1|Free $1K Tooling Certificate good for list price|Y
01|34992|4|2|tool holders|Y
01|34997|23|1|$5.00/net with the purchase of a matching holder.|Y
01|35002|1|1|RGA# T-46771|Y
01|35029|1|1|Pricing includes Chip hole only and coolant ports.|Y
01|35052|1|1|Spacer Ring for TCD-72232|Y
01|35052|2|1|Spacer Ring TCD-72408|Y
01|35052|3|1|Snap Ring for TCD-72232|Y
01|35052|4|1|Snap Ring TCD-72408|Y
01|35079|5|1|Capacity: 0-9/16|Y
01|35079|6|1|Capacity: 5/16-7/8|Y
01|35079|7|1|Capacity: 13/16-1.3/8|Y
01|35130|1|1|Full 4th axis install on Fanuc Robodrill w/16iM control|Y
01|35130|3|9|50% payment down / balance upon completion|Y
01|35130|3|10|Installation includes all harware cables expenses|Y
01|35134|1|1|Please note this is only an estimate.|Y
01|35134|57|1|Charge is to rework bearing race table will need to|Y
01|35134|57|2|be sent to Japan.  Delivery will be 10 weeks for the|Y
01|35134|57|3|rework alone.|Y
01|35134|58|1|Charge is for round trip freight charges to and from|Y
01|35134|58|2|Nikken Japan.|Y
01|35139|1|1|This line is listed at your NET cost.|Y
01|35171|1|1|Reference RGA# R-46728|Y
01|35171|3|1|Spindle and collet nut are damaged and must be replaced|Y
01|35171|3|2|Bearings seals and o-rings worn and must be replaced.|Y
01|35171|3|3|Labor is included.|Y
01|35176|3|1|10Ft Special External Cable|Y
01|35176|4|1|Bulk Head to Cabinet Cable Special - 16FT OAL|Y
01|35182|1|1|Includes Power Cable control box external cable|Y
01|35182|1|2|and pendant controller|Y
01|35182|3|1|Free $1K Tooling Certificate good for list price|Y
01|35182|3|2|tool holders.|Y
01|35191|1|1|Non-Cancelable & Non-Returnable|Y
01|35197|1|1|800MM rotary table with Nikken Alpha 21 controller|Y
01|35197|1|2|including power cable external cables M-code cable|Y
01|35197|1|3|and pendant.|Y
01|35197|2|1|1000MM rotary table with Nikken Alpha 21 controller|Y
01|35197|2|2|including power cable external cables M-code cable|Y
01|35197|2|3|and pendant.|Y
01|35197|3|1|Hydraulic pump with solenoid pressure switch and hoses|Y
01|35197|3|2|with quick disconnect.|Y
01|35197|4|1|M-code installtion including cable management|Y
01|35198|1|1|200MM 4th and 5th axis table with Mitsubishi motors|Y
01|35198|3|1|CONFERMATION OF CABLES NEEDED PRIOR TO ORDER|Y
01|35209|1|1|Freight charges for setting up the pickup of|Y
01|35209|1|2|3x C50FHM-ER32-215IC-110TP s/n: 64958 01 64039 01 &|Y
01|35209|1|3|64039 02.  Customer has sent in for Warranty re-work.|Y
01|35209|1|4|Mimatic is responsible for all freight charges.|Y
01|35209|1|5|Reference RGA# Q-46742.|Y
01|35213|1|1|Net Price Each|Y
01|35213|1|2|Non-Cancelable & Non-Returnable|Y
01|35243|1|1|Includes Solenoid Block 2 Proximity Switches|Y
01|35243|1|2|Includeds Air lines and fittings|Y
01|35243|7|1|10mm Steel Ball Bearing|Y
01|35270|1|1|Reference RGA# R-46792|Y
01|35270|3|1|Collet nut bearings seals and o-rings need to be|Y
01|35270|3|2|replaced. Labor is included.|Y
01|35281|1|1|Reference RGA# R-46766|Y
01|35281|3|1|Bearings seals and o-rings need to be replaced.|Y
01|35281|3|2|Spindles will be resurfaced.|Y
01|35282|1|1|Non-Cancelable & Non-Returnable|Y
01|35343|6|1|Substitute for PS-16 in stock at Lyndex-Nikken|Y
01|35354|1|1|Once order is placed this is non-returnable &|Y
01|35354|1|2|non-cancelable.|Y
01|35365|2|1|Rust proof treatment of spindle|Y
01|35372|1|1|This line is listed at your NET cost|Y
01|35374|1|1|200MM Face Plate with Alpha iF2/5000 & Aplha iS4/5000|Y
01|35376|1|1|260MM High Speed rotary with left hand mounted motor|Y
01|35376|1|2|including installation kit for S700|Y
01|35378|2|1|DIRECT AIR to E&R or E/U|Y
01|35399|2|1|Non-Cancelable & Non-Returnable|Y
01|35399|3|1|Non-Cancelable & Non-Returnable|Y
01|35411|1|1|This line is listed at your NET cost.|Y
01|35412|1|1|Non-standard stock item. Non-returnablenon-cancellable|Y
01|35412|1|2|Net Price Each|Y
01|35412|3|1|Non-standard stock item. Non-returnablenon-cancellable|Y
01|35412|3|2|Net Price Each|Y
01|35416|1|1|BALANCE ETA 3 WEEKS|Y
01|35426|2|1|Includes unit and quick disconnect hoses.|Y
01|35426|3|1|Includes dual axis drive amp bulkhead cables external|Y
01|35426|3|2|cables axis expansion card travel and labor|Y
01|35426|4|1|Free $1K Tooling Certificate good for list price|Y
01|35426|4|2|tool holders|Y
01|35427|2|1|Includes unit and quick disconnect hoses|Y
01|35427|3|1|Includes dual axis drive amp bulkhead cables external|Y
01|35427|3|2|cables axis expansion card travel and labor|Y
01|35427|4|1|Free $1K Tooling Certificate good for list price|Y
01|35427|4|2|tool holders.|Y
01|35432|14|1|Quoted at net price|Y
01|35432|20|1|Quoted as net price|Y
01|35432|21|1|Quoted at Net Price|Y
01|35443|1|1|This line is listed at your NET cost.|Y
01|35443|2|1|This line is listed at your NET cost.|Y
01|35460|14|1|Quoted at net price|Y
01|35460|20|1|Quoted as net price|Y
01|35460|21|1|Quoted at Net Price|Y
01|35464|14|1|Quoted at net price|Y
01|35464|20|1|Quoted as net price|Y
01|35464|21|1|Quoted at Net Price|Y
01|35468|1|1|Remaining balance from Qt# 34908|Y
01|35472|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|35494|14|1|Quoted at net price|Y
01|35494|20|1|Quoted as net price|Y
01|35494|21|1|Quoted at Net Price|Y
01|35505|1|1|Refurb|Y
01|35513|1|1|Discount reflected is for 1-50 piece quantity.|Y
01|35515|1|2|Non-Cancelable & Non-Returnable|Y
01|35519|47|1|Must ship by Truck|Y
01|35519|53|1|Modified with Jet Slots-Non Returnable|Y
01|35519|54|1|Modified with Jet Slots-Non Returnable|Y
01|35519|55|1|Modified with Jet Slots-Non Returnable|Y
01|35519|56|1|Modified with Jet Slots-Non Returnable|Y
01|35519|57|1|Modified with Jet Slots-Non Returnable|Y
01|35519|58|1|Modified with Jet Slots-Non Returnable|Y
01|35519|59|1|Modified with Jet Slots-Non Returnable|Y
01|35519|60|1|Modified with Jet Slots-Non Returnable|Y
01|35519|62|1|Modified with Coolant Ports Non Returnable|Y
01|35519|64|1|Modified with Coolant Ports Non Returnable|Y
01|35519|65|1|Modified with Coolant Ports Non Returnable|Y
01|35519|66|1|Modified with Coolant Ports Non Returnable|Y
01|35523|1|1|Non-Cancelable & Non-Returnable|Y
01|35526|1|1|Net Price Each|Y
01|35526|1|2|Non-Cancelable & Non-Returnable|Y
01|35526|2|1|Net Price Each|Y
01|35526|2|2|Non-Cancelable & Non-Returnable|Y
01|35526|4|1|Net Price Each|Y
01|35526|4|2|Non-Cancelable & Non-Returnable|Y
01|35531|1|1|This line is listed at your NET cost.|Y
01|35535|1|1|Reference RGA# R-46796|Y
01|35535|3|1|All bearings seals and o-rings must be replaced.|Y
01|35545|1|1|TCE-97277: Feedback cable for Rotary Axis.|Y
01|35546|3|1|Modify arbor screw - slotted for coolant|Y
01|35579|4|1|Used in SC1630C & SC1645C in aluminum cast iron|Y
01|35579|4|2|applications.|Y
01|35579|5|1|Used in SC1630C & SC1645C in steel applications.|Y
01|35579|6|1|Used in SC1660D in aluminum cast iron applications.|Y
01|35582|1|1|Reference RGA# T-46452|Y
01|35582|1|2|CNCZ180LSA3 s/n: 7013|N
01|35582|5|1|Freight charges for picking up customer's CNCZ180LSA3|Y
01|35582|5|2|s/n: 7013 for evaluation.  This is not a warranty|Y
01|35582|5|3|repair.  Customer is responsible for all freight|Y
01|35582|5|4|charges.  Reference RGA# T-46452.|Y
01|35591|4|1|This line is listed at your NET cost|Y
01|35597|2|1|MT-230 Spindle|Y
01|35607|1|1|180mm Center Height with option of MT#2 MT#3 or MT#4|Y
01|35607|1|2|center socket - customer must specify|Y
01|35607|2|1|Includes tavel time labor and necessary components|Y
01|35607|2|2|to wire tailstock into a relay for M-Code automation.|Y
01|35646|1|1|Tooling Certificate Number: 5410-663-080315|Y
01|35653|1|1|Install includes rotary table set up and cable hook up|Y
01|35653|1|2|to existing connections|Y
01|35653|1|3|Does not include any electronic or software components|Y
01|35676|1|1|Delivery is 2-3 weeks.|Y
01|35682|16|1|If you purchase a BT 45 Holder the knob is $5net each|Y
01|35682|16|2|y|N
01|35685|1|1|Nose Diameter of 1.083|Y
01|35685|6|1|Nose Diameter of 1.575|Y
01|35703|16|1|If you purchase a BT 45 Holder the knob is $5net each|Y
01|35707|16|1|If you purchase a BT 45 Holder the knob is $5net each|Y
01|35746|5|1|Possible replacement for tap collets|Y
01|35755|1|1|Stocked in IL.|Y
01|35755|2|1|Stock TBD|Y
01|35762|1|1|Return shipment of warranty replacements 3x 178139|Y
01|35762|1|2|s/n: 70069 03- Job 7320 70069 04- Job 7321 &|Y
01|35762|1|3|70069 02- Job 7322.  Reference RGA# Q-46742.|Y
01|35762|1|4|Mimatic is responsible for all freight charges.|Y
01|35812|1|1|Reference RGA# T-46847|Y
01|35812|1|2|CNC401FA s/n: 7235|N
01|35835|1|1|Custom 6 output muti-drill head for Okuma M460|Y
01|35835|1|2|This is pricing for one piece only|Y
01|35835|3|1|Custom 6 output muti-drill head for Okuma M460|Y
01|35835|3|2|This is pricing for 2 pieces only|Y
01|35835|5|1|Custom 6 output muti-drill head for Okuma M460|Y
01|35835|5|2|This is pricing for 4 pieces minimum|Y
01|35835|7|1|Custom made positioning block designed and manufactured|Y
01|35835|7|2|by Lyndex-Nikken with customer supplied spindle drawing|Y
01|35835|7|3|Customer will need one positioning block per machine.|Y
01|35838|1|1|Reference RGA# R-46880|Y
01|35838|1|2|HSK100A-C1-115|N
01|35838|3|1|Nut loosens easily there was no grease in the nut.|Y
01|35838|3|2|However operation seem ok.  We will clean up and|Y
01|35838|3|3|re-grease.|Y
01|35840|1|1|BORE IS COLLAPSED DUE TO CUSTOMER NOT INSERTING THE|Y
01|35840|1|2|TOOL FULLY. UNIT IS UNREPAIRABLE.|Y
01|35840|1|3|REFERENCE: RGA# R-46880|Y
01|35842|1|1|Non-Cancelable & Non-Returnable|Y
01|35846|1|1|REFERENCE RGA# R-46898|Y
01|35854|1|1|Reference RGA# T-46847|Y
01|35854|1|2|CNC401FA s/n: 7235|N
01|35854|4|1|Price reflects core trade in for table in for repair.|Y
01|35854|4|2|RGA # T-46847|Y
01|35854|4|3|In event of order - will use customer's existing motor.|Y
01|35889|1|1|REFERENCE RGA# R-46901|Y
01|35889|6|1|DISCOUNT GIVEN AS A ONE TIME COURTESY TO HAVE UNIT|Y
01|35889|6|2|REPLACED INSTEAD OF REPAIRED|Y
01|35893|9|1|Collet Sizes: TBD|Y
01|35893|9|2|Price reference|Y
01|35921|1|1|Reference RGA# R-46893|Y
01|35921|3|1|Collet nut gears bearings seals and o-rings are|Y
01|35921|3|2|worn and must be replaced.|Y
01|35933|2|1|No coolant through capabilities|Y
01|35933|3|1|No coolant through capabilities|Y
01|35943|17|1|BT30-SK13-120|Y
01|35943|18|1|BT30-SK13-90|Y
01|35943|20|1|SKG-15|Y
01|35943|22|1|BT30-SK6-75|Y
01|35948|9|1|Estimated time of arrival to Lyndex-Nikken 5/18/11|Y
01|35948|9|1|Estimated time of arrival to Lyndex-Nikken 6/3/11.|Y
01|35948|15|1|Three pieces in stock. Estimated time of arrival to|Y
01|35948|15|2|Lyndex-Nikken is 6/6/11.|Y
01|35948|23|1|2 pieces in stock. Estimated time of arrival to|Y
01|35948|23|2|Lyndex-Nikken 6/3/11.|Y
01|35948|33|1|Estimated delivery to Lyndex-Nikken 5/18/11.|Y
01|35948|35|1|Estimated date of delivery to Lyndex-Nikken 5/18/11.|Y
01|35949|1|1|Reference RGA# R-46839|Y
01|35949|3|1|Collet nut and gears are worn and must be replaced.|Y
01|35949|3|2|Bearings seals and o-rings must be replaced.|Y
01|35963|1|1|Estimate for repair of a CNC260.|Y
01|35965|1|1|Reference RGA# R-46819|Y
01|35965|3|1|All bearings seals and o-rings need to be replaced.|Y
01|35965|3|2|Spindles will be resurfaced.|Y
01|35971|1|1|Balance ETA pending|Y
01|35972|1|1|This item is considered special once a purchase|Y
01|35972|1|2|order is placed it cannot be cancelled or returned.|Y
01|35986|3|1|This line is listed at your NET cost|Y
01|35990|2|1|Includes unit and quick disconnect hoses|Y
01|35990|3|1|Includes dual axis drive amp bulkhead cables external|Y
01|35990|3|2|cables axis expansion card travel and labor|Y
01|35990|4|1|Free $1k Tooling Certificate good for list price tool|Y
01|35990|4|2|holders.|Y
01|35993|2|1|Includes unit and quick disconnect hoses|Y
01|35993|3|1|Includes dual axis drive amp bulkhead cables external|Y
01|35993|3|2|cables axis expansion card travel and labor|Y
01|35993|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|35993|4|2|holders.|Y
01|35995|4|1|Covers range for ER40 7/8 Coolant Collet|Y
01|35995|4|2|No such part as E40-056(C)|Y
01|35995|5|1|Covers range for ER40 1 Coolant Collet|Y
01|35995|5|2|No such part as E40-064(C)|Y
01|36002|1|1|Includes table and motors only|Y
01|36002|2|1|Includes unit and quick disconnect hoses|Y
01|36002|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|36002|3|2|holders.|Y
01|36002|4|1|12 Manual Scroll Chuck and Adapter Plate for CNC401|Y
01|36002|5|1|16 Manual Scroll Chuck and Adapter Plate for CNC401|Y
01|36002|6|1|Support Table Option|Y
01|36002|7|1|Tailstock Option|Y
01|36003|1|1|Includes table and motors only|Y
01|36003|2|1|Includes unit and quick disconnect hoses|Y
01|36003|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|36003|3|2|holders.|Y
01|36003|4|1|Support Table Option (will require 50mm riser)|Y
01|36003|5|1|Tailstock Option|Y
01|36037|1|1|Non-Cancelable & Non-Returnable|Y
01|36041|1|1|Non-Cancelable & Non-Returnable|Y
01|36077|1|1|HFO to supply Motor|Y
01|36077|1|2|This is standard pricing|Y
01|36077|1|3|Will need to negotiate special pricing for Knights|Y
01|36093|4|1|This size not available in dual contact.|Y
01|36093|5|1|This size not available in dual contact.|Y
01|36093|6|1|This size not available in dual contact.|Y
01|36093|7|1|This size not available in dual contact.|Y
01|36107|9|1|Estimated time of arrival to Lyndex-Nikken 5/18/11|Y
01|36107|9|1|Estimated time of arrival to Lyndex-Nikken 6/3/11.|Y
01|36107|15|1|Three pieces in stock. Estimated time of arrival to|Y
01|36107|15|2|Lyndex-Nikken is 6/6/11.|Y
01|36107|23|1|2 pieces in stock. Estimated time of arrival to|Y
01|36107|23|2|Lyndex-Nikken 6/3/11.|Y
01|36107|33|1|Estimated delivery to Lyndex-Nikken 5/18/11.|Y
01|36107|35|1|Estimated date of delivery to Lyndex-Nikken 5/18/11.|Y
01|36130|1|1|Repair of customer's 1x 5AX-201 s/n: 1104|N
01|36130|1|2|Reference RGA# T-46878|Y
01|36130|24|1|Labor has been quoted at 100% as a one time courtesy|Y
01|36130|24|2|per Steve Lenihan.|Y
01|36136|6|1|Machine is Mori DV5100 with Fanuc 0im control|Y
01|36136|6|2|4 + 1 installation|Y
01|36138|1|1|Includes table and motors only|Y
01|36138|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|36138|3|2|holders.|Y
01|36138|4|1|12 Manual Scroll Chuck and Adapter Plate for CNC401|Y
01|36138|5|1|16 Manual Scroll Chuck and Adapter Plate for CNC401|Y
01|36147|1|1|Comment: No Motor|Y
01|36147|3|1|Comment: No Motor|Y
01|36147|4|1|Comment: Stand alone Indexer complete with Alpha 21|Y
01|36147|4|2|controller power cable feedback cable and M-Code|Y
01|36147|4|3|cable.|Y
01|36147|7|1|Comment: Item is 3 meters long. Call for quote for|Y
01|36147|7|2|longer lengths.|Y
01|36147|7|3|Required for models LFA and LZA|Y
01|36147|8|1|Comment: Item is 3 meters long. Call for quote for|Y
01|36147|8|2|longer lengths.|Y
01|36147|8|3|Required for models LFA and LZA|Y
01|36154|26|1|This line at no charge as a courtesy to the customer|Y
01|36161|2|1|KM42-1.14 is listed at your net cost.|Y
01|36162|1|1|W/ PS-N46A|Y
01|36168|1|1|321MM Left Hand mounted Alpha iF12/3000 motor with|Y
01|36168|1|2|hydraulic brake system and shortest motor cover|Y
01|36168|1|3|possible.|Y
01|36168|1|4|500 PSI required with solenoid and pressure switch.|Y
01|36172|1|1|Comment: Standalone Indexing Unit complete with (2)|Y
01|36172|1|2|Alpha 21 controllers power cables feedback cables|Y
01|36172|1|3|and M-Code cables.|Y
01|36172|1|4|Installation Extra|Y
01|36183|5|1|Exact part number pending customer's measurement.|Y
01|36184|1|1|Non-Cancelable & Non-Returnable|Y
01|36230|1|1|Ref: Power Chuck HW-08-HS|Y
01|36230|2|1|Jaw Nut for H037M6|Y
01|36230|3|1|Jaw Nut for H037M6|Y
01|36245|1|1|Reference RGA# R-46930|Y
01|36246|1|1|Non-Cancelable & Non-Returnable|Y
01|36246|1|2|Net Price Each|Y
01|36248|1|1|Rotary Table with Right Hand Mounting|Y
01|36248|1|2|Okuma Set including table and cables.|Y
01|36248|2|1|Comments Includes mounting rotary on machine table and|Y
01|36248|2|2|cable hookup to existing connections.|Y
01|36248|2|3|Does not include any electronic or software components.|Y
01|36248|2|4|Installation is net price.|Y
01|36259|1|1|This table is for consignment at Yamazen-Indiana office|Y
01|36259|1|2|This table is new and has standard list price if sold.|Y
01|36273|2|1|These items are non standard stock|Y
01|36273|2|2|They are non-returnable and non-refundable upon firm PO|Y
01|36273|2|3|Freight has not been quoted but will be added once|Y
01|36273|2|4|determined|Y
01|36273|2|5|Pricing reflects net per holder and is subject to|Y
01|36273|2|6|change|Y
01|36275|23|1|Retention Knob Promotion|Y
01|36275|23|2|Free retention Knob with ever holder|Y
01|36280|1|1|Next Air Cut Off 09-16 for end of Sept delivery.|Y
01|36280|4|1|Next Air Cut Off 09-16 for end of Sept delivery.|Y
01|36284|1|1|Net Price Each|Y
01|36284|1|2|Non-Cancelable & Non-Returnable|Y
01|36284|2|1|Net Price Each|Y
01|36284|2|2|Non-Cancelable & Non-Returnable|Y
01|36284|3|1|Net Price Each|Y
01|36284|3|2|Non-Cancelable & Non-Returnable|Y
01|36284|4|1|Net Price Each|Y
01|36284|4|2|Non-Cancelable & Non-Returnable|Y
01|36284|5|1|Net Price Each|Y
01|36297|1|1|This line is listed at your NET cost.|Y
01|36300|1|1|Reference RGA# T-46915|Y
01|36300|1|2|5AX-2MT-105-120FA s/n: 8243|N
01|36300|13|1|Rotary Trunion keys|Y
01|36315|4|1|320MM rotary indexer with Nikken control for M-code|Y
01|36315|4|2|connection. Includes:Table motor cable setspendant &|Y
01|36315|4|3|power cable.|Y
01|36328|2|1|Arbor screw slots modification charge.|Y
01|36329|44|1|Blake has collet at desk in Midwest Sales office|Y
01|36332|53|1|Blake has these at his desk in Midwest Sales office|Y
01|36339|2|1|Reference RGA# R-46938|Y
01|36339|3|1|N Style Batteries need to be replaced.|Y
01|36339|12|1|N Style Batteries need to be replaced.|Y
01|36341|3|1|Includes - axis drives bulkhead cable sets external|Y
01|36341|3|2|cable sets axis expansion card parameter changes|Y
01|36341|3|3|travel and labor.|Y
01|36341|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|36341|4|2|holders.|Y
01|36341|5|1|12 Manual Scroll Chuck and Adapter Plate for CNC401|Y
01|36341|6|1|16 Manual Scroll Chuck and Adapter Plate for CNC401|Y
01|36342|1|1|200MM tilt rotary table without motors|Y
01|36351|1|1|Net Price Each|Y
01|36351|1|2|Non-Cancelable & Non-Returnable|Y
01|36351|1|3|1 set = 10p|Y
01|36374|2|1|ER40-3(C)-HEX at no charge with purchase of C4007-0040|Y
01|36378|2|1|Pneumatic actuation with MT#3 center sockets|Y
01|36378|4|1|Includes: Axis drive bulkhead cable set external|Y
01|36378|4|2|cable set axis expansion card parameter changes|Y
01|36378|4|3|travel and labor for install on Mori DV5100|Y
01|36378|5|1|Free $1K Tooling Certificate good for list price tool|Y
01|36378|5|2|holders.|Y
01|36380|3|1|$1000.00 Free Tooling certificate promo|Y
01|36392|2|1|Reference RGA# R-46960|Y
01|36392|3|1|N STYLE BATTERIES NEED TO BE REPLACED|Y
01|36392|8|1|N STYLE BATTERIES NEED TO BE REPLACED.|Y
01|36392|19|1|If replacements are declined inspection fee of $50.00|Y
01|36392|19|2|net each will apply.|Y
01|36396|1|1|Non-Cancelable & Non-Returnable|Y
01|36398|1|1|Showroom Special pricing|Y
01|36402|2|1|If ordering please confirm machine make & model.|Y
01|36402|7|1|All sales are final!!|Y
01|36402|8|1|All sales are final!!!|Y
01|36406|1|1|5AX201FAM conversion to Fanuc motor and wireharness|Y
01|36406|2|1|Installation: 5AX-201FAM to Makino S33|Y
01|36406|2|2|Includes: Dual axis drive unit short bar fiber optic|Y
01|36406|2|3|cables communications cables bulkhead cables|Y
01|36406|2|4|external cables & service time and travel.|Y
01|36408|2|1|Up to 4 pcs in 2 weeks|Y
01|36408|4|1|Up to 10 pcs in 2 weeks|Y
01|36411|6|1|Machine is Mori DV5100 with Fanuc 0im control|Y
01|36411|6|2|4 + 1 installation|Y
01|36413|21|1|Tooling Certificate Discount less 35 percent.|Y
01|36413|22|1|Please verify retention knob  dimension at the time|Y
01|36413|22|2|of final quote.|Y
01|36413|22|3|****Sample Quote for Hurco VM10HSi****|Y
01|36415|1|1|Complete Assy - Drawing TCZ-E6004|Y
01|36415|4|1|Part # 86C|Y
01|36415|5|1|Part # 86B|Y
01|36415|6|1|Part # 85A|Y
01|36415|7|1|Part # 81B|Y
01|36415|8|1|Part # 84A|Y
01|36415|9|1|Part # 81A|Y
01|36441|1|1|Reference RGA# T-46816|Y
01|36444|1|1|Net Price Each|Y
01|36444|1|2|Non-Cancelable & Non-Returnable|Y
01|36444|2|1|Net Price Each|Y
01|36444|2|2|Non-Cancelable & Non-Returnable|Y
01|36472|1|1|ETA for balance pending|Y
01|36504|3|1|TCE-08133/1 - POWER SIGNAL CABLE|Y
01|36507|2|1|Please confirm tap shank and drive square prior to|Y
01|36507|2|2|ordering this item.|Y
01|36511|1|1|w/ installed PS-17 pull stud|Y
01|36517|10|1|All sales are final!!|Y
01|36517|14|1|All sales are final!!!|Y
01|36520|2|1|Pneumatic actuation with MT#3 Center Socket|Y
01|36520|3|1|Includes drive amp bulkhead cable set external cable|Y
01|36520|3|2|set axis expansion card parameter changes travel|Y
01|36520|3|3|and labor for a Makino PS95 machine (one table/machine)|Y
01|36520|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|36520|4|2|holders.|Y
01|36598|1|1|Seco Part #UMCC1250-25(C)|Y
01|36598|2|1|Seco Part # UMCC1250N-25C|Y
01|36630|1|1|260MM Indexer with AA21 controller cables power cord|Y
01|36630|1|2|M-code cable and pendant included.|Y
01|36631|3|1|Adapter Plate 3-999-ADP65|Y
01|36631|4|1|Soft Jaws H064M6|Y
01|36632|1|1|KS-AX123R-ZA254R with packing Rotary Axis cover|Y
01|36632|2|1|KS-AX123R-ZA189T with packing Titl Axis cover|Y
01|36640|1|1|Start2 SF machine only|Y
01|36640|3|1|Start2 SF machine and 10 CAT40 standard SF holder pkg.|Y
01|36642|1|1|All sales are FINAL!|Y
01|36642|10|1|All sales are FINAL!|Y
01|36646|1|1|Includes table with Haas motors and cales|Y
01|36646|2|1|Free $1k Tooling Certificate good for list price tool|Y
01|36646|2|2|holders.|Y
01|36650|2|1|Checking Stock Status.|Y
01|36654|2|1|Pneumatic actuation with MT#3 Center Socket|Y
01|36654|3|1|Includes drive amp bulkhead cable set external cable|Y
01|36654|3|2|set axis expansion card parameter changes travel|Y
01|36654|3|3|and labor for a Makino PS95 machine with Midaco shuttle|Y
01|36654|3|4|pallet changer. (one table and tailstock per pallet)|Y
01|36654|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|36654|4|2|holders.|Y
01|36663|2|1|Pull Stud PS-123-AIR included with NC5-46-FS16-37-60S|Y
01|36678|1|1|Holders modified with: Balluf Chip and HS Coolant Nut|Y
01|36678|1|2|installed.|Y
01|36692|6|1|Please order M5-38|Y
01|36692|8|1|1 pcs stock Japan after this is sold it is discontinued|Y
01|36692|16|2|Please order M7-62|Y
01|36700|1|1|Net Price Each|Y
01|36700|1|2|Non-Cancelable & Non-Returnable|Y
01|36713|1|1|Reference RGA# R-46921|Y
01|36713|3|1|Collet nut and gears are worn and must be replaced.|Y
01|36713|3|2|Bearings seals and o-rings must also be replaced.|Y
01|36718|10|1|Tooling Cert Discount Applies to the Quote-|Y
01|36734|1|1|Okuma Motors|Y
01|36734|2|1|Hydraulic supply for pancake cylinder to actuate 5C|Y
01|36734|2|2|Collet Fixture.|Y
01|36734|3|1|Hydraulic pancake cylinder for actuating 5C collet.|Y
01|36734|4|1|5C Collet Fixture with 2.187-10 O.D. thread for step|Y
01|36734|4|2|collets.|Y
01|36734|5|1|Manual hand valve for actuating 5C Collet Fixture.|Y
01|36734|6|1|Free $1K Tooling Certificate good for list price tool|Y
01|36734|6|2|holders.|Y
01|36736|1|1|Start2 Shrink Fit Unit Package- 10 Standard Gage Length|Y
01|36736|1|2|holders and the Shrink Fit Unit for $11500.00|Y
01|36736|1|3|*******************************************************|Y
01|36750|2|1|Does not include interface|Y
01|36756|2|1|Reference RGA# R-46913|Y
01|36756|3|1|Collet nuts bearings seals and o-rings must be|Y
01|36756|3|2|replaced. Labor is included.|Y
01|36756|6|1|Reference RGA# R-46913|Y
01|36756|7|1|Collet nuts spindle bearings seals and o-rings|Y
01|36756|7|2|must be replaced. Labor is included.|Y
01|36764|1|1|Reference RGA# R-46919|Y
01|36764|3|1|M4X3L SCREW CAPS|Y
01|36776|3|1|*Net Price|Y
01|36776|3|2|*Positioning Block to be designed and manufactured by|Y
01|36776|3|3|Lyndex-Nikken upon receipt of machine spindle drawing.|Y
01|36782|1|1|178998: Positioning Pin Assembly.|Y
01|36796|1|1|Balance in 24 weeks|Y
01|36796|2|1|Balance in 21 weeks|Y
01|36798|1|1|Discount reflects core trade-in.|Y
01|36798|1|2|Reference RGA# R-47003|Y
01|36803|32|1|Non-Cancelable & Non-Returnable|Y
01|36803|33|1|Non-Cancelable & Non-Returnable|Y
01|36803|35|1|Non-Cancelable & Non-Returnable|Y
01|36803|36|1|Non-Cancelable & Non-Returnable|Y
01|36803|37|1|Non-Cancelable & Non-Returnable|Y
01|36803|38|1|Non-Cancelable & Non-Returnable|Y
01|36803|39|1|Non-Cancelable & Non-Returnable|Y
01|36821|1|1|Holder is slightly used|Y
01|36821|2|1|Holders are slightly used.|Y
01|36841|1|1|Reference RGA# R-46933|Y
01|36841|3|1|Collet nuts bearings seals and o-rings must be|Y
01|36841|3|2|replaced. Labor is included.|Y
01|36845|1|1|Reflects special negotiated price|Y
01|36845|1|2|HFO Tampa to supply correct motors|Y
01|36845|1|3|HFO Tampa to supply cables|Y
01|36846|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|36846|2|2|holders.|Y
01|36847|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|36847|2|2|holders. One Free Certificate per table.|Y
01|36847|4|1|Customer to supply any needed riser or fixturing.|Y
01|36848|2|1|New Drive Amp - A06B-6079-H103|Y
01|36866|4|1|**DIN - COOLANT THROUGH THE FLANGE**|Y
01|36866|4|2|If customer is not using coolant this feature is mute.|Y
01|36870|1|1|Reference RGA# T-46876|Y
01|36870|1|2|CNC250LFA s/n: 4676 w/ motion pack|N
01|36875|1|1|Reference RGA# R-46933|Y
01|36875|1|2|Discount reflects core trade-in.|Y
01|36894|1|1|This is a package price which includes the unit and|Y
01|36894|1|2|10 standard length CAT50 shrink fit holders of the|Y
01|36894|1|3|customer's choice.|Y
01|36896|1|1|This is a package price which includes the unit and|Y
01|36896|1|2|10 standard length CAT50 shrink fit holders of the|Y
01|36896|1|3|customer's choice.|Y
01|36901|1|1|Reference RGA# T-46906|Y
01|36901|1|2|5AX-201FA s/n: 1024|N
01|36934|1|1|Discount reflects one-time offer to replace damaged|Y
01|36934|1|2|holder instead of sending in for evaluation.|Y
01|36934|1|3|Should you choose to send in the damaged holder for|Y
01|36934|1|4|evaluation this quotation will no longer be valid.|Y
01|36948|3|1|This can be modified per instructions.|Y
01|36948|3|2|Comes with bushing (BK50BS-A)|Y
01|36951|6|1|This line is listed at your NET cost|Y
01|36960|9|1|Delivery 3-4 months|Y
01|36960|9|2|configuration of external cable required|Y
01|36975|4|1|*In stock if needed|Y
01|36988|2|1|Back up screws are at no charge if purchase with above|Y
01|36988|2|2|holders.|Y
01|37010|1|1|This table is set up for an OSP control on the OKuma|Y
01|37010|1|2|Millac 44V.  If the machine has a Fanuc control then|Y
01|37010|1|3|the part number will be CNC180FA-M but price is same.|Y
01|37011|2|1|Includes: Dual axis drive amps bulkhead cable sets|Y
01|37011|2|2|external cable sets axis expansion card parameter|Y
01|37011|2|3|changes travel and labor.|Y
01|37011|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|37011|3|2|holders.|Y
01|37012|1|1|Includes: Dual axis drive amps bulkhead cable sets|Y
01|37012|1|2|external cable sets axis expansion card parameter|Y
01|37012|1|3|changes travel and labor.|Y
01|37018|1|1|This item is considered special once a purchase|Y
01|37018|1|2|order is placed it cannot be cancelled or returned.|Y
01|37025|1|1|600MM Table with top mount motor with Haas motor and|Y
01|37025|1|2|cable set.|Y
01|37025|2|1|800MM table with speical sub plate for vertical use|Y
01|37025|2|2|including Haas motor and cable set.|Y
01|37025|3|1|500psi hydraulic unit for the table brake systems|Y
01|37025|4|1|Installation includes parameter changes and cable setup|Y
01|37038|1|1|Right Hand Unit with Fanuc Motor less cables|Y
01|37038|2|1|Left Hand Unit with Fanuc Motor less cables|Y
01|37049|1|1|2-180MM High Speed tables with sheet metal divider|Y
01|37049|1|2|amplifiers and cable sets|Y
01|37049|3|1|$1000.00 Free Tooling promotion|Y
01|37053|1|1|Net Price Each|Y
01|37053|1|2|Non-Cancelable & Non-Returnable|Y
01|37065|1|1|Reference RGA# T-46867|Y
01|37065|1|2|CNC180LSA3 s/n: 10297|Y
01|37085|4|1|Steakfest tooing for the Show. Special pricing applies.|Y
01|37088|1|1|Reference RGA# T-46867|Y
01|37088|1|2|TAT-170 s/n: 6520 - Sent in for evaluation.|Y
01|37089|3|1|Turn Key Project- Special pricing applies.|Y
01|37095|1|1|Reference RGA# R-46969|Y
01|37095|1|2|PF-2 Sent in for evaluation.|Y
01|37095|4|1|N Style Batteries need to be replaced.|Y
01|37112|1|1|Reference RGA# R-46988|Y
01|37112|3|1|Re-calibration of unit.|Y
01|37127|1|1|200MM 4th & 5th axis table with motor and cable set|Y
01|37128|1|1|Reference RGA# R-46910|Y
01|37128|3|1|Bearings seals and o-rings need to be repalced.|Y
01|37128|3|2|Milling chuck part# S17-C12-104.4 will be replaced|Y
01|37128|3|3|from customer's stock - 5 will remain.|Y
01|37128|3|4|Labor is included.|Y
01|37130|5|1|This line at no charge as a courtesy to the customer|Y
01|37143|1|1|Repair of customer's 184693 Capto Side only.|Y
01|37143|2|1|Resurface spindles replace all bearings seals and|Y
01|37143|2|2|o-rings.|Y
01|37143|2|3|Minimum of 3 week delivery.|Y
01|37145|1|1|Repair of customer's 184693 Service entire tool.|Y
01|37145|2|1|Resurface spindles replace all bearings seals and|Y
01|37145|2|2|o-rings.|Y
01|37145|2|3|Minimum of 3 week delivery.|Y
01|37155|1|1|200mm faceplate tilt/rotary table with Okuma motors|Y
01|37155|1|2|Air Brake|Y
01|37155|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|37155|2|2|holders.|Y
01|37157|1|1|200mm faceplate tilt/rotart table with Okuma motors and|Y
01|37157|1|2|hydraulic brakes.|Y
01|37157|2|1|500 psi hydraulic tank and unit for the tables brake|Y
01|37157|2|2|system.|Y
01|37157|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|37157|3|2|holders.|Y
01|37161|1|1|Reference RGA# T-46803|Y
01|37161|1|2|CNC260FA|N
01|37161|10|1|TAT-500 Support Table|N
01|37161|22|1|Reference RGA# T-46803|Y
01|37161|22|2|CNC500V s/n: 1568|N
01|37161|39|1|Labor hours for repair of CNC500V s/n: 1568|Y
01|37161|40|1|Additional hours to do hydraulic plumbling on table.|Y
01|37165|1|1|Reference RGA# T-46823|Y
01|37165|1|2|5AX-2MT-105-120FA s/n: 8109|N
01|37175|1|1|Discount is a one-time offer to replace damaged holder|Y
01|37175|1|2|instead of sending in for repair.|Y
01|37175|1|3|Should you decide to send in the damaged holder this|Y
01|37175|1|4|quotation will no longer be valid.|Y
01|37191|26|1|(falls in range of .156 - 5/32)|Y
01|37191|27|1|(falls in range of .093 - 3/32)|Y
01|37191|30|1|(falls in range of .0625 - 1/16)|Y
01|37191|37|1|(falls in range of 4.25)|Y
01|37191|39|1|(falls in range of 4.75)|Y
01|37191|40|1|(falls in range of 5.25)|Y
01|37194|3|1|This can be modified per instructions.|Y
01|37194|3|2|Comes with bushing (BK50BS-A)|Y
01|37205|1|1|Reference RGA# T-46973|Y
01|37210|1|1|Special promotion Table cablestooling tailstock|Y
01|37210|3|1|Includes Nikken 5AX-201Cables Tailstockstarter pack|Y
01|37210|3|2|Please advise needed delivery|Y
01|37221|2|1|* Note pull stud price reflects Special Net Charge|Y
01|37231|2|1|Includes drive amp bulkhead cable sets external cable|Y
01|37231|2|2|set axis expansion card parameter changes travel|Y
01|37231|2|3|and labor.|Y
01|37231|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|37231|3|2|holders.|Y
01|37244|1|1|Reference RGA# R-46986|Y
01|37244|1|2|3x MNL12-ER40Z s/n: A0131 A0132 & A0133|N
01|37244|3|1|Collet Nut bearings seals and o-rings must be|Y
01|37244|3|2|replaced.  Labor charges included.|Y
01|37244|3|3|Delivery will be 2 weeks|Y
01|37248|1|1|5AX-100FA-M is for reference only.  Part number will be|Y
01|37248|1|2|5AX-100OSP3-M for table with Okuma motors and pricing|Y
01|37248|1|3|will be the same.|Y
01|37248|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|37248|2|2|holders.|Y
01|37265|1|1|Option #1 - 6in Scroll Chuck|Y
01|37265|2|1|Option #2 - 8in Scroll Chuck|Y
01|37265|3|1|Manual Tailstock option #1|Y
01|37265|4|1|Manual Tailstock option #2|Y
01|37311|1|1|Non-Cancelable & Non-Returnable|Y
01|37316|1|1|350MM 4th and 5th axis table with hydraulic brake|Y
01|37317|1|1|300MM table with Haas motor and cable set|Y
01|37317|3|1|320MM table with Haas motor and cable set with hyd|Y
01|37317|3|2|brake system|Y
01|37317|4|1|Air/hyd booster for CNC321 table|Y
01|37332|1|1|Reference RGA# T-47030|Y
01|37332|1|2|CNCZ100-2W-YA-M s/n: 9082|N
01|37336|1|1|List Price Each|Y
01|37336|2|1|List Price Each|Y
01|37342|1|1|Cable set included|Y
01|37342|1|2|Special Pricing|Y
01|37342|1|3|Delivery 2-3 week  (OSP3 Motor needed)|Y
01|37365|1|1|2 pcs. stock/ 4 pcs 4 weeks|Y
01|37398|49|1|Chip pockets machining/installation holders rebalanced|Y
01|37400|1|1|Tailstock comes with romovable MT#2 Dead Center|Y
01|37405|1|1|32mm Straight Shaft Gear with Compression Coupling|Y
01|37431|1|1|Delivery will be 3 weeks from the receipt of a|Y
01|37431|1|2|purchase order.|Y
01|37431|2|1|Delivery will be 3-4 weeks from the receipt of a|Y
01|37431|2|2|purchase order.|Y
01|37433|1|1|Covers for 5AX-201HFA-6PRJ S/N 1248 & 2004|Y
01|37433|2|1|Cover for 5AX-201HFA-6PRJ S/N 4018|Y
01|37471|8|1|Minimum order 10 pcs.|Y
01|37491|1|1|Reference RGA# T-46853|Y
01|37496|1|1|Reference RGA# T-46855|Y
01|37496|27|1|TCE-C8022-JI: Internal Power Cable|Y
01|37511|1|1|Reference RGA# T-46854|Y
01|37524|1|1|Discountined item however we have one available and|Y
01|37524|1|2|can offer extra discount. This item is non-returnable.|Y
01|37531|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|37531|5|1|*1pc left - pre-balanaced and balanceable|Y
01|37534|1|1|240pc C40-1500-MATS-EU|Y
01|37534|1|2|$37.00ea List / Less 50%= $18.50ea x 240pc = $4440.00|Y
01|37540|1|1|Special rotary union built into the table casting|Y
01|37540|2|1|Scale kit for tilting axis - Installation included.|Y
01|37550|3|1|This can be modified per instructions.|Y
01|37550|3|2|Comes with bushing (BK50BS-A)|Y
01|37558|3|1|Lyndex-Nikken to make upon receipt of final dimensions|Y
01|37558|3|2|of spindle drawing|Y
01|37559|1|1|Reference RGA# R-47007|Y
01|37559|3|1|Collet nut must be replaced.|Y
01|37559|3|2|Bearings seals and o-rings must be replaced.|Y
01|37559|3|3|Labor is included.|Y
01|37564|3|1|Includes dual axis drive amp bulk head cable set|Y
01|37564|3|2|external cable set axis expansion card parameter|Y
01|37564|3|3|changes travel and labor.|Y
01|37564|4|1|Free $1k Tooling Certificate good for list price|Y
01|37564|4|2|tool holders.|Y
01|37573|1|1|Reference RGA# T-46856|Y
01|37575|1|1|200MM 4th and 5th axis table with Fanuc motors|Y
01|37575|2|1|1000PSI max pressure rotary union|Y
01|37575|3|1|Installation includes: Dual axis drvie unitfiber optic|Y
01|37575|3|2|cables communications cables bulkhead cable sets|Y
01|37575|3|3|external cable sets parameter changes servive time &|Y
01|37575|3|4|travel.|Y
01|37575|4|1|Installation kit: Dual axis drive unit fiber optic|Y
01|37575|4|2|cables communications cable sets bulkhead cables|Y
01|37575|4|3|external cable sets.|Y
01|37577|4|1|Hydraulic tank and unit for table brake systems.|Y
01|37577|5|1|Includes: drive amps bulk head cables external cables|Y
01|37577|5|2|axis expansion card parameter changes travel and|Y
01|37577|5|3|labor.|Y
01|37577|6|1|Free $1K Tooling Certificate good for list price tool|Y
01|37577|6|2|holders.|Y
01|37580|11|1|TCL-100GH is non standard stock once a purchase order|Y
01|37580|11|2|is placed it cannot be cancelled or returned.|Y
01|37580|11|3|Quoted at net price.|Y
01|37580|12|1|Quoted as net price.|Y
01|37582|1|1|*w/ Makino Pins for Makino Mag3 machine|Y
01|37582|2|1|*w/ Makino Pins for Makino Mag3 machine|Y
01|37582|3|1|*w/ Makino Pins for Makino Mag3 machine|Y
01|37583|5|1|Custom Positioning Block for Okuma M560|Y
01|37583|5|2|ETA is after receipt of complete dimensional data from|Y
01|37583|5|3|End User.|Y
01|37583|6|1|Custom Positioning Block for Haas VF-3|Y
01|37583|6|2|ETA is after receipt of complete dimensional data from|Y
01|37583|6|3|End User.|Y
01|37596|1|1|67.05.043.01 Hydraulic Chuck BT30 6mm coolant|Y
01|37596|2|1|67.05.043.02 Hydraulic Chuck BT30 8mm coolant|Y
01|37596|3|1|67.05.043.03 Hydraulic Chuck BT30 10mm coolant|Y
01|37596|4|1|67.05.043.04 Hydraulic Chuck BT30 12mm coolant|Y
01|37596|5|1|67.05.043.05 Hydraulic Chuck BT30 14mm coolant|Y
01|37596|6|1|67.05.043.06 Hydraulic Chuck BT30 16mm coolant|Y
01|37596|7|1|67.05.043.07 Hydraulic Chuck BT30 18mm coolant|Y
01|37596|8|1|67.05.043.08 Hydraulic Chuck BT30 20mm coolant|Y
01|37596|9|1|67.05.043.09 Hydraulic Chuck BT 25mm coolant|Y
01|37596|21|1|67.05.071.011 Shrink Chuck Induterm BT30 25mm|Y
01|37606|1|1|Net Price Each|Y
01|37606|1|2|Non-Cancelable & Non-Returnable|Y
01|37606|2|1|Net Price Each|Y
01|37606|3|1|Net Price Each|Y
01|37606|4|1|Net Price Each|Y
01|37606|5|1|Net Price Each|Y
01|37606|6|1|Net Price Each|Y
01|37606|7|1|Net Price Each|Y
01|37606|8|1|Net Price Each|Y
01|37606|8|2|Non-Cancelable & Non-Returnable|Y
01|37606|9|1|Net Price Each|Y
01|37606|9|2|Non-Cancelable & Non-Returnable|Y
01|37606|10|1|Net Price Each|Y
01|37606|10|2|Non-Cancelable & Non-Returnable|Y
01|37635|1|1|13 pieces available from Nikken Japan|Y
01|37635|4|1|Nikken Japan only has one in stock/bal 13 weeks|Y
01|37635|4|2|upon receipt of purchase order.|Y
01|37639|1|1|13 pieces available from Nikken Japan|Y
01|37639|4|1|Nikken Japan only has one in stock/bal 13 weeks|Y
01|37639|4|2|upon receipt of purchase order.|Y
01|37648|1|1|SRM-50.0 Tough Cut Skill Reamer (Morris Taper Shank)|Y
01|37648|1|2|Currently 1pc in Japan ETA 1 week balance ETA 5 weeks|Y
01|37654|1|1|Pricing reflect's 1 or 2 tools.|Y
01|37662|1|1|Service completed on 9/17 by Armando Mena|Y
01|37662|3|1|Transit Time of 13.5 hours x $100.00/hr = $1350.00|Y
01|37662|3|2|Hotel: 2 x $115.00/night = $230.00|Y
01|37662|3|3|Food: $42.58|Y
01|37662|4|1|Service Charge 12 hours x $135.00/hr = $1620.00|Y
01|37673|1|1|Tables supplied with OSP3 Servo Motors|Y
01|37673|1|2|Compatable with Okuma M560V machine|Y
01|37673|1|3|Interface proprietary with Okuma|Y
01|37673|1|4|4th Axis interface from Okuma usually includes Cables|Y
01|37673|2|1|Checking Stock Status.|Y
01|37674|2|1|Customer to supply any needed risers or sub plates.|Y
01|37674|3|1|500 PSI unit and hoses for table brake system|Y
01|37674|4|1|Includes: drive amp bulk head cable set external|Y
01|37674|4|2|cable set axis expansion card parameter changes|Y
01|37674|4|3|travel and labor.|Y
01|37674|5|1|Free $1K Tooling Certificate good for list price tool|Y
01|37674|5|2|holders.|Y
01|37686|1|1|Quoted as HSK63 Form F Holder|Y
01|37686|1|2|1/2 NPU Keyless Drill Chuck Coolant-thru|Y
01|37686|1|3|Gage Length = 135mm|Y
01|37686|1|4|NO MAKINO PINS|Y
01|37706|4|1|This is included w/ purchase of SF unit|Y
01|37715|8|1|Included with the purchsae of the Modular Angle Head|Y
01|37718|1|1|Reference RGA# T-46851|Y
01|37739|1|1|Non-Cancelable & Non-Returnable|Y
01|37759|1|1|Above knob is a possible substitute|Y
01|37761|1|1|Total length of this holder is 6.55.|Y
01|37761|2|1|Total length of this holder 10.5.|Y
01|37765|3|1|Includes: dual axis drive amp bulkhead cable sets|Y
01|37765|3|2|external cable sets axis expansion card parameter|Y
01|37765|3|3|changes travel and labor.|Y
01|37765|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|37765|4|2|holders.|Y
01|37769|2|1|Includes: drive amp bulkhead cable sets external|Y
01|37769|2|2|cable sets axis expansion card parameter changes|Y
01|37769|2|3|travel and labor.|Y
01|37769|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|37769|3|2|holders.|Y
01|37786|1|1|Reference RGA# T-46787|Y
01|37839|3|1|Need to take CAT50-SK10F-165U --> CAT50-SK10F-165UP|N
01|37865|2|1|Shrink fit pots included with the purchase of SF unit.|Y
01|37873|1|1|This product reflects closeout discount pricing. All|Y
01|37873|1|2|sales are final.|Y
01|37875|4|1|Installation on OKK VM7|Y
01|37881|1|1|8 pcs stock/2 pcs 2 weeks/balance 13 weeks|Y
01|37883|1|1|Non-Cancelable & Non-Returnable|Y
01|37883|3|1|BO 2-3 weeks|Y
01|37885|1|1|Table with Okuma motors|Y
01|37885|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|37885|2|2|holders.|Y
01|37885|5|1|**OPTION** (Only needed for hydraulic braking)|Y
01|37891|4|1|This line at no charge as a courtesy to the customer|Y
01|37892|1|1|Price includes shrink fit machine and 10 holders of|Y
01|37892|1|2|your choice from the selected list.|Y
01|37892|1|3|Shrink Fit Machine must ship by truck.|Y
01|37894|1|1|Includes SF unit 2 CAT40 SF pots and 10 SF holders|Y
01|37894|2|1|Shrink fit pots included with the purchase of SF unit.|Y
01|37913|2|1|No O-Ring|Y
01|37937|9|1|Estimated time of arrival to Lyndex-Nikken 5/18/11|Y
01|37937|9|1|Estimated time of arrival to Lyndex-Nikken 6/3/11.|Y
01|37937|15|1|Three pieces in stock. Estimated time of arrival to|Y
01|37937|15|2|Lyndex-Nikken is 6/6/11.|Y
01|37937|23|1|2 pieces in stock. Estimated time of arrival to|Y
01|37937|23|2|Lyndex-Nikken 6/3/11.|Y
01|37937|33|1|Estimated delivery to Lyndex-Nikken 5/18/11.|Y
01|37937|35|1|Estimated date of delivery to Lyndex-Nikken 5/18/11.|Y
01|37965|1|1|Reference RGA# R-46956|Y
01|37965|1|2|4x H-BO-QC-059|N
01|37970|3|1|CNC200 Right Hand Cover Converted to Left Hand|Y
01|37970|3|2|Approx 2 working days for conversion|Y
01|37974|12|1|Replaces BE3908E01X2|Y
01|37974|17|1|Replaces WP-13|Y
01|37974|21|1|Replacement cover gasket for Rotary Motor Cover|Y
01|38014|1|1|Table set up with HAAS motor and cable.|Y
01|38014|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|38014|4|2|holders.|Y
01|38016|2|1|Please allow for four M-Codes for the M-signal|Y
01|38016|2|2|3-4 weeks for cable and table prep.|Y
01|38016|3|1|Cable Set Includes- two cables and bulk head|Y
01|38017|1|1|Table set up with HAAS motor and cable.|Y
01|38017|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|38017|4|2|holders.|Y
01|38018|1|1|Rotary Table is in Stock.|Y
01|38018|1|2|Hyd brake. Include Hyd Unit + Cable Set x 2|Y
01|38023|9|1|Estimated time of arrival to Lyndex-Nikken 5/18/11|Y
01|38023|9|1|Estimated time of arrival to Lyndex-Nikken 6/3/11.|Y
01|38023|15|1|Three pieces in stock. Estimated time of arrival to|Y
01|38023|15|2|Lyndex-Nikken is 6/6/11.|Y
01|38023|23|1|2 pieces in stock. Estimated time of arrival to|Y
01|38023|23|2|Lyndex-Nikken 6/3/11.|Y
01|38023|33|1|Estimated delivery to Lyndex-Nikken 5/18/11.|Y
01|38023|35|1|Estimated date of delivery to Lyndex-Nikken 5/18/11.|Y
01|38024|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|38024|2|2|holders.|Y
01|38027|2|1|IDC is responsible for the 4th & 5th axis Fanuc option|Y
01|38027|2|2|software being turned onthis must be done through the|Y
01|38027|2|3|machine builder. The ladder to support the 4th & 5th|Y
01|38027|2|4|axis table must be present in order to complete the|Y
01|38027|2|5|installation.|Y
01|38034|6|1|This order qualifies for the Collet Promo discount!|Y
01|38120|1|1|2-100MM twin spindle high speed tables with R450X1|Y
01|38120|1|2|interface package|Y
01|38127|1|1|Reference RGA# T-47046|Y
01|38128|1|1|Price above reflects NET CHARGE|Y
01|38128|2|1|Price above reflects NET CHARGE|Y
01|38128|3|1|Price above reflects NET CHARGE|Y
01|38132|1|1|2-5AX130SABR2 tables with R450X1 interface kit complete|Y
01|38135|3|1|Tooling Certificate included in the purchase of a|Y
01|38135|3|2|Nikken table.|Y
01|38137|4|1|1 year additional warranty|Y
01|38138|6|1|Installation on Fanuc 0i-Md cotrol to be 4 + 1 capable|Y
01|38138|6|2|Machine must have 4th and 5th axis parameters turned on|Y
01|38138|6|3|Machine Data Sheets required|Y
01|38149|1|1|*offered in 380-480V as option|Y
01|38149|4|1|*offered in 380-480V as option|Y
01|38154|1|1|*Package includes choice of 10 pieces of CAT40 or BT30|Y
01|38154|1|2|standard length shrink fit holders|Y
01|38180|4|1|Need to confirm cable length|Y
01|38185|1|2|Delivery ETA 5 Days after receiving firm PO|Y
01|38185|2|1|`|Y
01|38189|1|1|Non-Cancelable & Non-Returnable|Y
01|38213|1|1|BALANCE IN 4-5 WKS|Y
01|38220|2|1|.500Pin & Hole Diameter|Y
01|38220|3|1|.500 Pin & Hole Diameter|Y
01|38221|1|1|*Qty Break 20-29pcs|Y
01|38221|3|1|*Qty Break 30-34pcs|Y
01|38221|5|1|*Qty Break 35-49pcs|Y
01|38221|7|1|*Qty Break 50+pcs|Y
01|38223|1|1|Non-Cancelable & Non-Returnable|Y
01|38229|1|1|Table with Siemens Motor|Y
01|38229|2|1|Heidenhain Scale Kit and Installation on CNC180 only|Y
01|38229|2|2|One kit to be installed on new table being purchased|Y
01|38229|2|3|One kit to be installed on customer's existing table|Y
01|38229|2|4|Customer's existing table is CNC180 Serial# 7441|Y
01|38229|2|5|Customer will send existing CNC180 to Lyndex-Nikken for|Y
01|38229|2|6|Scale kit retrofit.|Y
01|38229|2|7|Customer is responsible for the installation of rotary|Y
01|38229|2|8|table on the machine.|Y
01|38250|1|1|Reference RGA# T-46976|Y
01|38250|1|2|CNC180BFA s/n: 10365|N
01|38279|4|1|This line at no charge as a courtesy to the customer|Y
01|38279|5|1|This line at no charge as a courtesy to the customer|Y
01|38287|1|1|Budgetary quote for repair of 5AX-200II|Y
01|38304|1|1|Budgetary quotation for repair of CNC250|Y
01|38311|1|1|Table with Fanuc Motors|Y
01|38326|1|1|Net Price Each|Y
01|38326|1|2|Non-Cancelable & Non-Returnable|Y
01|38326|2|1|Net Price Each|Y
01|38326|2|2|Non-Cancelable & Non-Returnable|Y
01|38326|3|1|Net Price 392.60 each|Y
01|38326|3|2|Non-Cancelable & Non-Returnable|Y
01|38334|1|1|Non-Cancelable & Non-Returnable|Y
01|38354|1|1|Reference RGA# R-46862|Y
01|38354|1|2|MNL12-ER32Z-MS s/n: A1690|Y
01|38354|3|1|Collet nut bearings seals and o-rings must be|Y
01|38354|3|2|replaced.|Y
01|38354|3|3|Price includes labor and freight charges to and from|Y
01|38354|3|4|Alps Japan.|Y
01|38355|2|1|Power and Feedback cables for each axis|Y
01|38373|3|1|Included in the Install-- dual axis drive fiber optic|Y
01|38373|3|2|comminication cablesshort bar bulk head cable sets|Y
01|38373|3|3|external cables service and travel time.|Y
01|38373|6|1|Included in the Install-- Axis drive fiber optic|Y
01|38373|6|2|commincation cables short bar bulk head cable sets|Y
01|38373|6|3|external cables service time and travel time.|Y
01|38378|2|1|Air frieght for HW-10C-COL from Japan - 125lbs|Y
01|38382|1|1|Reference RGA# R-47097|Y
01|38382|3|1|Evaluation & re-calibration of unit.|Y
01|38383|7|1|Customer has the option of Lyndex-Nikken making PB|Y
01|38383|7|2|or they can make their own|Y
01|38384|2|1|Extended Discount applied for replacment of old tooling|Y
01|38384|2|2|at 3D Design Mfg - one time offer|Y
01|38392|1|1|Reference RGA# T-47040|Y
01|38453|2|1|500 PSI unit and hoses for table brake systems.|Y
01|38453|3|1|Includes: Dual axis drive amp bulkhead calbe sets|Y
01|38453|3|2|external cable sets parameter changes travel and|Y
01|38453|3|3|labor.|Y
01|38456|1|1|Net Price Each|Y
01|38456|1|2|Non-Cancelable & Non-Returnable|Y
01|38456|1|3|2p Minimum Order|Y
01|38456|2|1|Net Price Each|Y
01|38456|2|2|Non-Cancelable & Non-Returnable|Y
01|38470|1|1|Reference RGA# T-46850|Y
01|38470|38|1|Steel Ball 5/16|Y
01|38483|7|1|Quoted for 10-32 spiral cut tap|Y
01|38493|5|1|Please supply 4th axis wiring diagram as well as|Y
01|38493|5|2|voltage for air booster. (100V or 24V)|Y
01|38493|5|3|Also please note length of cable at time of order|Y
01|38522|1|1|Hydraulic Braking|Y
01|38522|2|1|500 PSI unit and hoses for table brake systems.|Y
01|38522|3|1|Includes: Dual axis drive amps bulkhead cable sets|Y
01|38522|3|2|external cable sets fiber optic cable communication|Y
01|38522|3|3|cables travel and labor per machine|Y
01|38522|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|38522|4|2|holders|Y
01|38525|2|1|This is for generic PB from Lyndex-Nikken|Y
01|38525|2|2|Will be blank block w/tapered bushing already installed|Y
01|38539|1|1|200MM 4th and 5th axis table without motors|Y
01|38539|1|2|with rust proof coating.|Y
01|38542|2|1|500 PSI unit and hoses for table brake systems|Y
01|38542|3|1|Includes: dual axis drive amps bulkhead cable sets|Y
01|38542|3|2|external cable sets fiber optic cable communications|Y
01|38542|3|3|cable travel and labor for installation on DV5100|Y
01|38548|1|1|Reference RGA# T-46980|Y
01|38564|1|1|Discount reflects 1 piece price.|Y
01|38564|2|1|Discount reflects 2 piece price.|Y
01|38564|3|1|Discount reflects 1 piece price.|Y
01|38564|4|1|Discount reflects 2 piece price.|Y
01|38582|2|1|500 PSI unit and hoses for table brake systems|Y
01|38582|3|1|Includes: drive amps bulkhead cable sets external|Y
01|38582|3|2|cable sets fiber optic cable communications cable|Y
01|38582|3|3|travel and labor per machine.|Y
01|38584|1|1|For CNC202LSA3 s/n: 1095|Y
01|38584|1|2|Delivery will be 4 weeks from the receipt of a PO.|Y
01|38586|1|1|Non-Cancelable & Non-Returnable|Y
01|38605|8|1|Net Price Each|Y
01|38605|8|2|Non-Cancelable & Non-Returnable|Y
01|38605|9|1|Non-Cancelable & Non-Returnable|Y
01|38605|10|1|Net Price Each|Y
01|38605|10|2|Non-Cancelable & Non-Returnable|Y
01|38615|1|1|SF-Package-CT50-STD- $12000.00|Y
01|38615|1|2|(ten standard gage lenght holders)|Y
01|38615|1|3|SF-Package-CT50-EXT- $12800.00|Y
01|38615|1|4|(Ten extended gage length holders)|Y
01|38615|1|5|Mix 5 std length and 5 extended lenth holders for|Y
01|38615|1|6|$12400.00|Y
01|38615|1|7|ETA at Lyndex Nikken 11-6-2015|Y
01|38622|1|1|AC3-MTA1-90 AC3-MTA2-95 AC4-MTA1-90 AC4-MTA2-95|Y
01|38622|1|2|AC4-MTA3-115 AC5-MTA2-105 AC5-MTA3-115 AC5-MTA4-145|Y
01|38651|4|1|Machine + 10 holders of customer's choice and includes|Y
01|38651|4|2|2 taper pots.|Y
01|38678|1|1|Reference RGA# R-47138|Y
01|38679|1|1|500 PSI unit and hoses for table brake systems.|Y
01|38680|1|1|100MM 4th and 5th axis table with Fanuc motor and|Y
01|38680|1|2|Nikken Alpha 21 control for tilt axis.|Y
01|38680|3|1|Installation: Dual axis drive to control the 4th|Y
01|38680|3|2|axis on pallet A & B M-code connection of two Nikken|Y
01|38680|3|3|Alpha 21 controls for the 5th axis on pallet A & B|Y
01|38680|3|4|cable managment parameter changes and service time.|Y
01|38680|3|6|Installation Charge is same for either table.|Y
01|38681|50|1|Change nuts to hex style before shipping.|Y
01|38688|1|1|1.45LB Each|Y
01|38688|2|1|6.7LB Each|Y
01|38688|3|1|0.5LB Each|Y
01|38688|4|1|0.5LB Each|Y
01|38688|5|1|0.5LB Each|Y
01|38690|31|1|Change nuts to hex style before shipping.|Y
01|38705|15|1|Three pieces in stock. Estimated time of arrival to|Y
01|38705|15|2|Lyndex-Nikken is 6/6/11.|Y
01|38705|23|1|2 pieces in stock. Estimated time of arrival to|Y
01|38705|23|2|Lyndex-Nikken 6/3/11.|Y
01|38705|33|1|Estimated delivery to Lyndex-Nikken 5/18/11.|Y
01|38705|35|1|Estimated date of delivery to Lyndex-Nikken 5/18/11.|Y
01|38720|1|1|Non-Cancelable & Non-Returnable|Y
01|38720|1|2|Net price each|Y
01|38734|2|1|Reference RGA# R-47128|Y
01|38734|3|1|Bearings seals and o-rings must be replaced. Spindles|Y
01|38734|3|2|will be resurfaced as needed. Labor is included.|Y
01|38734|6|1|Reference RGA# R-47128|Y
01|38734|6|2|Bearings seals and o-rings must be replaced. Input|Y
01|38734|6|3|shaft must be replaced. Spindles will be resurfaced as|Y
01|38734|6|4|needed. Labor is included.|Y
01|38761|2|1|HSK63A-SMS22-50  Nikken 22mm Shell Mill Holder|Y
01|38781|1|1|Reference RGA# T-46976|Y
01|38803|1|1|Delivery 2-3 days after receipt of PO|Y
01|38805|1|1|Reference RGA# T-47143|Y
01|38821|2|1|This option is for a designed and manufactured block by|Y
01|38821|2|2|Lyndex-Nikken.|Y
01|38821|2|3|This option will require the customer to supply a|Y
01|38821|2|4|drawing of the machine spindle face and gage line.|Y
01|38848|1|1|Reference RGA# T-47139|Y
01|38848|1|2|CNC250 s/n: 3456|N
01|38848|31|1|Internal Wireharness for CNC250 s/n: 3456|Y
01|38848|31|2|Existing wireharness is contaminated with coolant.|Y
01|38869|1|1|Tooling Certificate number: 13687-670-082115RT|Y
01|38919|1|1|Net Price Each|Y
01|38919|2|1|Net Price Each|Y
01|38919|3|1|Net Price Each|Y
01|38923|3|1|Nut Wrench for both OKL3-ER32X & OKL3-ER32Z|Y
01|38923|4|1|Setting Fixture for OKL3-ER32X|Y
01|38923|5|1|Setting Fixture for OKL3-ER32Z|Y
01|38941|1|1|*Quoted at Net Price|Y
01|38941|2|1|*Quoted at Net Price|Y
01|38949|2|1|Includes: Drive amp bulkhead cable set external cable|Y
01|38949|2|2|set fiber optic and communication cables parameter|Y
01|38949|2|3|changes travel and service labor.|Y
01|38954|1|1|Table set up for HAAS (motors & cables).|Y
01|38954|1|2|Table will be set up for AIR BRAKING.|Y
01|38969|2|1|Cable kit with amplifier|Y
01|38983|3|1|Lyndex-Nikken to manufacturer upon receipt of spindle|Y
01|38983|3|2|drawing|Y
01|38986|1|1|Reference RGA# R-47136|Y
01|38986|4|1|Labor is $110/hour. Price reflects 2.5 hours of labor.|Y
01|38996|1|1|Net Price Each|Y
01|38996|2|1|Net Price Each|Y
01|38996|3|1|Net Price Each|Y
01|38996|4|1|Net Price Each|Y
01|38996|4|2|Non-Cancelable & Non-Returnable|Y
01|39001|1|1|*1-2pc pricing|Y
01|39001|3|1|3-6pc special pricing|Y
01|39017|1|1|1-Table only twin spindle with backhand mounted motor|Y
01|39017|1|2|with TC32BN installtion kit|Y
01|39027|35|1|*M6 US taps|Y
01|39027|36|1|*M8 US taps|Y
01|39027|37|1|*M10 US taps|Y
01|39027|38|1|*M12 US taps|Y
01|39029|3|1|Please see comments for next part number before quoting|Y
01|39029|3|2|this NX50-STB to your customer. It will not work as is|Y
01|39029|3|3|for the Makino A71 machine.|Y
01|39029|4|1|NX50-STB will not work as is for Makino A71 machine.|Y
01|39029|4|2|Pricing provided is for a Custom Block made by|Y
01|39029|4|3|Lyndex-Nikken to match machine exactly.|Y
01|39029|4|4|Lyndex-Nikken can provide instructions for customer to|Y
01|39029|4|5|make an adaptor to go along with the NX50-STB but if|Y
01|39029|4|6|shipped alone it will not work for the Makino A71.|Y
01|39061|1|1|Reference RGA# R-47149|Y
01|39061|3|1|Bearings seals and o-rings must be replaced.|Y
01|39061|3|2|Labor is included.|Y
01|39061|5|1|Discount reflects core trade-in.|Y
01|39065|1|1|This item is being discontinued and I have only 5pcs|Y
01|39065|1|2|left in stock. I have offered an additional 15% special|Y
01|39065|1|3|closeout price for this to you. Please reference this|Y
01|39065|1|4|quote# 39065 on your order should you choose to purchas|Y
01|39072|1|1|Reference RGA# R-47157|Y
01|39072|1|2|Customer has declined repair and replacement of|Y
01|39072|1|3|CAT40-NPU13-105U & CAT40-NPU8-80U. Inspection fee of|Y
01|39072|1|4|$50.00 each to be assessed and units to be returned|Y
01|39072|1|5|reassembled.|Y
01|39072|2|1|Returning customer's CAT40-NPU13-105U & CAT40-NPU8-80U.|Y
01|39072|2|2|Units to be returned reassembled.|Y
01|39073|2|1|Adapter plate A2-11 is included with Power Chuck.|Y
01|39073|3|1|3pcs required per Chuck|Y
01|39073|4|1|JFB-2612 Drawbar Assembly for Okuma V80R|Y
01|39073|7|1|Adapter plate A2-11 is included with Power Chuck. Must|Y
01|39073|7|2|add additional JFB-2614 Adapter Plate for V100R Okuma.|Y
01|39073|8|1|3pcs required per Chuck|Y
01|39073|9|1|JFB-2613 Drawbar Assembly for Okuma V100R|Y
01|39073|10|1|JFB-2614 Adapter Plate for V100R Okuma|Y
01|39074|2|1|Custom Positioning Block per machine specs provided|Y
01|39076|2|1|S500 Drive unit and cable set for S500X1|Y
01|39081|1|1|Reference RGA# R-47119|Y
01|39081|1|2|OKL3-ER32X s/n: AL790|N
01|39081|3|1|Spindle and collet nut must be replaced. Bearings|Y
01|39081|3|2|seals and o-rings must be replaced. Labor is included.|Y
01|39081|5|1|Reference RGA# R-47119|Y
01|39081|5|2|OKL3-ER32X s/n: AL0157|N
01|39081|7|1|Spindle and collet nut must be replaced. Bearings|Y
01|39081|7|2|seals and o-rings must be replaced. Labor is included.|Y
01|39081|10|1|Previously repaired and certified by Alps in|Y
01|39081|10|2|Lyndex-Nikken Used Inventory.|Y
01|39081|12|1|Previously repaired and certified by Alps in|Y
01|39081|12|2|Lyndex-Nikken Used Inventory.|Y
01|39086|1|1|105MM table with SS face plate and Nikken Alpha 21|Y
01|39086|1|2|controller with cables and pendant for M-code hook up.|Y
01|39091|7|1|.062 drill|Y
01|39091|8|1|.216 drill|Y
01|39091|8|2|6mm endmill|Y
01|39091|8|3|7/32 endmill|Y
01|39091|8|4|#1 drill|Y
01|39091|9|1|.276 drill|Y
01|39091|10|1|#5 drill|Y
01|39091|11|1|2mm endmill|Y
01|39091|12|1|3mm endmill|Y
01|39091|13|1|4mm endmill|Y
01|39091|14|1|1/2 Key Seat Cutter|Y
01|39097|1|1|*Qty Break Pricing: 1-3pcs|Y
01|39097|3|1|*Qty Break Pricing: 4-5pcs|Y
01|39100|14|1|Collet set contains all collets quoted below.|Y
01|39104|1|1|180MM High Speed Table with left hand mounted motor for|Y
01|39104|1|2|Brother TCS2D.|Y
01|39104|4|1|$1000.00 Free Tooling Promotion|Y
01|39109|3|1|For consideration for immediate stock|Y
01|39109|4|1|For immmediate stock|Y
01|39113|1|2|Non-Cancelable & Non-Returnable|Y
01|39113|2|2|Non-Cancelable & Non-Returnable|Y
01|39117|2|1|External Cable sets for 5AX-201FA-M-AB on Robodrill|Y
01|39117|2|2|to work with standard Methods interface.  Meredith to|Y
01|39117|2|3|do installation of all RT components.|Y
01|39117|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|39117|3|2|holders.|Y
01|39139|25|1|This item is offered as an alternative to|Y
01|39139|25|2|HSK100A-SM1250-4.00|Y
01|39139|25|3|B = Balanceable is an added feature|Y
01|39157|6|1|Quoted as a net price to you.|Y
01|39158|1|1|Replacement Graduation Ring for C50RAM-ER32-200OTC|Y
01|39158|1|2|s/n: 7070156602|Y
01|39164|1|1|Net Price Each|Y
01|39190|2|1|Installtion Kit - Includes: drive amp bulk head cables|Y
01|39190|2|2|external cable sets fiber optic cable communication|Y
01|39190|2|3|cables.|Y
01|39206|2|1|Installation kit for 0iMD control: Drive unit bulkhead|Y
01|39206|2|2|cables external cables fiber optic cable comm cable.|Y
01|39206|2|3|Duravertical 5100 Doosan or DMC with Beta drives|Y
01|39248|2|1|Non-Cancelable & Non-Returnable|Y
01|39248|3|1|Non-Cancelable & Non-Returnable|Y
01|39260|1|1|Reference RGA# T-47022|Y
01|39260|17|1|TCE-94159(1)J2 Feedback cable|Y
01|39260|18|1|TCE-C1084-J1 Power Cable|Y
01|39267|6|1|Net Price Each|Y
01|39281|1|1|Comparable to WTO 48-82808|Y
01|39281|2|1|Comparable to WTO 48-82162|Y
01|39281|3|1|Comparable to WTO 410120087-40|Y
01|39281|4|1|Comparable to WTO 410120133-40|Y
01|39281|5|1|Comparable to WTO 413002024-40|Y
01|39286|1|1|UNV # 62|Y
01|39297|1|1|Non-Cancelable & Non-Returnable|Y
01|39299|1|1|HSK63A-0750-4.00B|Y
01|39299|1|2|Pre-Balanced and Balanceable to G2.5 or better at|Y
01|39299|1|3|24000 rpm. Coolant Thru|Y
01|39301|1|1|Discount is one-time offer to replace unrepairable|Y
01|39301|1|2|unit sent in on RGA# R-47192|Y
01|39304|1|1|1 table only|Y
01|39304|1|3|For R650X1|Y
01|39305|3|1|Full Installation|Y
01|39305|3|2|Includes: bulk head cable sets external cable sets|Y
01|39305|3|3|amps communication cables fiber optic cable travel|Y
01|39305|3|4|and labor.|Y
01|39305|5|1|Installation Kit Only|Y
01|39305|5|2|Kit includes: amps cable sets and needed components.|Y
01|39328|1|1|Table delivery 8 weeks|Y
01|39328|2|1|Tailstock delivery 8 weeks|Y
01|39350|6|1|*ER20 High Speed Sub|Y
01|39351|1|1|Additional discount quoted by Steve Lenihan as a|Y
01|39351|1|2|one-time courtesy.  Customer's holders sent in on|Y
01|39351|1|3|RGA# R-47152 are un-repairable.|Y
01|39365|3|1|Pricing is based upon a 10-pc minimum order.|Y
01|39373|1|1|One-time discount to no send in damaged PF-2 and just|Y
01|39373|1|2|replace.|Y
01|39376|1|1|Set includes the following: 2-CNCZ180LYA-BR tables with|Y
01|39376|1|2|sheet metal divider junction box with main cable set|Y
01|39376|1|3|B-master cables and load zone index button|Y
01|39380|1|1|Non-Cancelable & Non-Returnable|Y
01|39380|2|1|Non-Cancelable & Non-Returnable|Y
01|39386|9|1|Substitute for BT40-WE1/4-120|Y
01|39390|6|1|2mm - 13mm Clamping Range|Y
01|39413|1|1|Net Price Each|Y
01|39413|2|1|Net Price Each|Y
01|39413|3|1|Net Price Each|Y
01|39413|4|1|Net Price Each|Y
01|39413|5|1|Net Price Each|Y
01|39413|6|1|Net Price Each|Y
01|39413|7|1|Net Price Each|Y
01|39413|8|1|Net Price Each|Y
01|39416|1|1|Reference RGA# T-47008|Y
01|39416|1|2|CNC300 s/n: NA|N
01|39420|1|1|Net Price Each|Y
01|39420|1|2|Non-Cancelable & Non-Returnable|Y
01|39420|3|1|Net Price Each|Y
01|39420|3|2|Non-Cancelable & Non-Returnable|Y
01|39420|5|1|Net Price Each|Y
01|39420|5|2|Non-Cancelable & Non-Returnable|Y
01|39420|7|1|Net Price Each|Y
01|39420|7|2|Non-Cancelable & Non-Returnable|Y
01|39420|9|1|Net Price Each|Y
01|39420|9|2|Non-Cancelable & Non-Returnable|Y
01|39420|11|1|Net Price Each|Y
01|39420|11|2|Non-Cancelable & Non-Returnable|Y
01|39420|13|1|Net Price Each|Y
01|39420|13|2|Non-Cancelable & Non-Returnable|Y
01|39420|15|1|Net Price Each|Y
01|39420|15|2|Non-Cancelable & Non-Returnable|Y
01|39431|1|1|Discount reflects core trade-in.|Y
01|39446|1|1|Hydraulic Brakes|Y
01|39446|2|1|500 PSI unit and hoses for table brake sysems.|Y
01|39446|3|1|Includes: drive amp bulk head cable sets external|Y
01|39446|3|2|cable sets fiber optic cable communication cables|Y
01|39446|3|3|travel and labor for installation on YCM NSV-102A.|Y
01|39446|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|39446|4|2|holders.|Y
01|39447|1|1|Air Brakes|Y
01|39447|2|1|Includes: Drive amps bulk head cable sets external|Y
01|39447|2|2|cable sets fiber optic cable communication cable|Y
01|39447|2|3|travel and labor for installation on YCM NSV-102A.|Y
01|39447|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|39447|3|2|holders.|Y
01|39459|3|1|Replaces NTB-120155|Y
01|39459|5|1|Replaces AX203510|Y
01|39459|8|1|Actual measurement needed from customer's existing|Y
01|39459|8|2|parts. See e-mail for more information.|Y
01|39459|12|1|Actual measurement needed from customer's existing|Y
01|39459|12|2|parts. See e-mail for more information.|Y
01|39464|2|1|Machine Tool- Rotary Table Accessory|Y
01|39464|2|2|Makino F-5 Productivity to provide the installation|Y
01|39464|2|3|Heidenhain Scale Kit Installed at Lyndex Nikken|Y
01|39469|1|1|Machine- Makino F-5|Y
01|39469|1|2|Installation- Productivity to provide installation|Y
01|39469|1|3|Lyndex Nikken to provide table and motors|Y
01|39493|2|1|Includes: Drive unit bulkhead cables external cables|Y
01|39493|2|2|communications cables fiber optic cable service time|Y
01|39493|2|3|and travel.|Y
01|39493|3|1|Includes installation: Drive unit hard wired cable|Y
01|39493|3|2|service time and travel.|Y
01|39511|18|1|Special Discount (50%) per Scott I.|Y
01|39531|1|1|Net Price Each|Y
01|39531|1|2|Non-Cancelable & Non-Returnable|Y
01|39531|2|1|Net Price Each|Y
01|39531|2|2|Non-Cancelable & Non-Returnable|Y
01|39531|3|1|Net Price Each|Y
01|39531|3|2|Non-Cancelable & Non-Returnable|Y
01|39531|4|1|Net Price Each|Y
01|39531|4|2|Non-Cancelable & Non-Returnable|Y
01|39537|1|1|400MM direct drive table with hard wired cable set.|Y
01|39537|2|1|500MM direct drive table with hard wired cable set|Y
01|39554|7|1|Quoting EU at discount as a one-time courtesy to have|Y
01|39554|7|2|them purchase replacements instead of repairing|Y
01|39554|7|3|damaged holders.|Y
01|39554|7|4|Ok'ed by Nick Mazis as a one-time courtesy.|N
01|39554|8|1|Quoting as a one time courtesy.|Y
01|39554|8|2|Ok'ed by Nick Mazis|N
01|39554|9|1|Quoting as a one time courtesy.|Y
01|39554|9|2|Ok'ed by Nick Mazis.|N
01|39557|1|1|Threaded Tailstock Bushing|Y
01|39583|1|1|Tooling Certificate Number: 13435-675-091115RT|Y
01|39583|1|2|Tooling Certificate Number: 13435-693-102915RT|Y
01|39584|1|1|Hydraulic Brakes|Y
01|39584|2|1|500 PSI unit and hoses for table braking systems.|Y
01|39584|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|39584|3|2|holders.|Y
01|39585|2|1|Free $1k Tooling Certificate good for list price tool|Y
01|39585|2|2|holders.|Y
01|39586|1|1|Hydraulic Brakes|Y
01|39586|2|1|500 PSI unit and hoses for table braking systems.|Y
01|39586|3|1|Includes: drive amps bulk head cable sets external|Y
01|39586|3|2|cable sets fiber optic cable communication cables|Y
01|39586|3|3|travel and labor.|Y
01|39586|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|39586|4|2|holders.|Y
01|39587|2|1|500 PSI unit and hoses for table brake system.|Y
01|39587|3|1|Includes: Drive amp bulk head cable set external|Y
01|39587|3|2|cable set fiber optic cable communication cable|Y
01|39587|3|3|travel and labor.|Y
01|39587|4|1|2 Years Total Warranty!|Y
01|39590|1|1|350 MM Faceplate|Y
01|39590|1|2|Installation includes drive cables labor|Y
01|39590|1|3|Installation 4 + 1 capabilities|Y
01|39590|1|4|Machine Data sheets required|Y
01|39590|1|5|Control must have 4th and 5th axis turned on|Y
01|39590|1|6|Table to fit along X axis only|Y
01|39594|1|1|Quoted as Net Price|Y
01|39596|4|1|020-009 (9/64) & 020-020 (5/16) ETA 12/30|Y
01|39604|22|1|This line is listed at your NET cost|Y
01|39636|4|1|This line is listed at your NET cost|Y
01|39652|1|1|Reference RGA# T-47198|Y
01|39657|7|1|Coolant Port Modification for all End Mill Holders|Y
01|39657|13|1|Slotted Coolant Screw for NC4011-1250-4.00|Y
01|39668|1|1|Discount quoted is for 1 to 2 pieces.|Y
01|39673|22|1|PMK8-3.2 Collet- currently in stock at factory in Japan|Y
01|39701|2|1|Only missing size is 1/16 due 11/10|Y
01|39704|1|1|Reference RGA# R-47207|Y
01|39704|5|1|N Style batteries need to be replaced.|Y
01|39706|12|1|This item is being offered as an alternative to the|Y
01|39706|12|2|HSK100A-0625-4.00 above for the balance of 1 piece|Y
01|39709|1|1|Non-Cancelable & Non-Returnable|Y
01|39723|1|1|180240 Clamping Ring MI63 New Wrench|Y
01|39723|1|2|1-2 week delivery.|Y
01|39723|1|3|If order is placed by 12pm on 10/29/15 ETA will be 1|Y
01|39723|1|4|delivery.|Y
01|39724|3|1|Included in Shrink Fit Package|Y
01|39724|4|1|Included in Shrink Fit Package|Y
01|39724|5|1|Included in Shrink Fit Package|Y
01|39736|1|1|Reference RGA# T-47142|Y
01|39740|10|2|Installation includes drice servo motor labor|Y
01|39740|10|3|Full 4th axis to Makino PS95 w/ Fanuc OiM control|Y
01|39740|10|4|no additional hardware needed|Y
01|39740|10|5|Air brake Nikken patented worm/wheel design|Y
01|39740|15|1|Three pieces in stock. Estimated time of arrival to|Y
01|39740|15|2|Lyndex-Nikken is 6/6/11.|Y
01|39740|23|1|2 pieces in stock. Estimated time of arrival to|Y
01|39740|23|2|Lyndex-Nikken 6/3/11.|Y
01|39740|33|1|Estimated delivery to Lyndex-Nikken 5/18/11.|Y
01|39740|35|1|Estimated date of delivery to Lyndex-Nikken 5/18/11.|Y
01|39741|1|1|2-100MM twin spindle table with installation kit for|Y
01|39741|1|2|R450X1|Y
01|39743|8|1|Pull Stud Promo|Y
01|39747|1|1|Quoted as Net Price|Y
01|39749|3|1|Special Collet Promo Discount applied to this order.|Y
01|39758|29|1|Not Available Coolant Thru|Y
01|39758|30|1|Not Available Coolant Thru|Y
01|39758|33|1|Not Available Coolant Thru|Y
01|39758|35|1|Not Available Coolant Thru|Y
01|39758|36|1|Not Available Coolant Thru|Y
01|39758|77|1|Coolant arbor screw needed|Y
01|39758|78|1|Coolant arbor screw needed|Y
01|39760|1|1|Balance in 2 Weeks|Y
01|39774|5|1|This line is listed at your NET cost|Y
01|39776|2|1|This is offered as an alternative to the above item|Y
01|39776|2|2|that is not in stock. List price is $3350.00 ea. will|Y
01|39776|2|3|offer at same price as above to help secure the order|Y
01|39800|1|1|Non-Cancelable & Non-Returnable|Y
01|39800|2|1|Non-Cancelable & Non-Returnable|Y
01|39806|1|1|Reference RGA# T-47179|Y
01|39816|1|1|Hydraulic Brakes|Y
01|39816|2|1|500 PSI unit and hoses for table brake systems.|Y
01|39819|1|1|Quoted 1 or 2 pieces|Y
01|39819|2|1|Quoted 3 or 4 pieces|Y
01|39819|3|1|Quoted 5 or 6 pieces|Y
01|39819|4|1|Quoted 1 or 2 pieces.|Y
01|39819|5|1|Quoted 3 or 4 pieces.|Y
01|39819|6|1|Quoted 5 or 6 pieces|Y
01|39825|4|1|**DIN - COOLANT THROUGH THE FLANGE**|Y
01|39825|4|2|If customer is not using coolant this feature is mute.|Y
01|39829|1|1|***This is quoted for Nikken standard pitch (82mm)|Y
01|39829|1|2|ETA 2-3 weeks if standard pitch 82mm is acceptable|Y
01|39830|3|1|Net Price Each|Y
01|39830|3|2|Non-Cancelable & Non-Returnable|Y
01|39841|1|1|Tooling Certificate Number: 13366-680-100115RT|Y
01|39845|1|1|100MM twin spindle high speed table with motor|Y
01|39845|1|2|Full 4th axis install Doosan DNM400II (Fanuc Oim)|Y
01|39848|1|1|Jeffreys to supply motor and cables|Y
01|39850|2|1|Coolant nuts will be swapped out on the above holders|Y
01|39850|2|2|Note the NET price on nuts includes swap charge|Y
01|39858|1|1|Testing of customer's Alpha21A controller|Y
01|39858|1|2|s/n: D003ZG47914003.|Y
01|39858|1|3|Reference RGA# T-47260|Y
01|39858|2|1|This cable is from out test unit and has been used|Y
01|39858|2|2|only for testing.|Y
01|39868|6|1|Installation on Fanuc 0i-Md cotrol to be 4 + 1 capable|Y
01|39868|6|2|Machine must have 4th and 5th axis parameters turned on|Y
01|39868|6|3|Machine Data Sheets required|Y
01|39872|1|1|Accupro 80263833|Y
01|39872|2|1|Accupro 80263825|Y
01|39872|3|1|Accupro 80263890|Y
01|39872|4|1|Accupro 80263882|Y
01|39872|5|1|Accupro 80263957|Y
01|39872|6|1|Accupro 80263940|Y
01|39890|4|1|This item is a Closeout Special in stock that can be|Y
01|39890|4|2|utilized for immediate shipping. Special discount has|Y
01|39890|4|3|been applied.|Y
01|39891|3|1|This line at no charge as a courtesy to the customer|Y
01|39894|1|1|Reference RGA# R-47232|Y
01|39894|1|2|OKA00-20000 s/n: AL0275 Sent in for evaluation.|N
01|39894|3|1|Bearingsseals o-rings and collet nut must be replaced|Y
01|39894|3|2|Labor is included.|Y
01|39898|1|1|CAT40-C1.1/4SL-105U to DIN MODI 4-hole|Y
01|39898|1|2|Non-Cancelable & Non-Returnable|Y
01|39898|1|3|Net Price Each|Y
01|39898|3|1|CAT40-C1.1/4-85U to DIN MODI 4-hole|Y
01|39898|3|2|Non-Cancelable & Non-Returnable|Y
01|39898|3|3|Net Price Each|Y
01|39898|5|1|CAT40-C1-85U to DIM MODI 2-hole|Y
01|39898|5|2|Non-Cancelable & Non-Returnable|Y
01|39898|5|3|Net Price Each|Y
01|39900|2|1|Installation includes: Dual axis drive unit fiber|Y
01|39900|2|2|optic cables communications cables bulkhead cables|Y
01|39900|2|3|external cables plumbing for the brake systems and|Y
01|39900|2|4|service time and travel.|Y
01|39906|11|1|Actual measurement needed from customer's existing|Y
01|39906|11|2|parts.|Y
01|39928|1|1|Mimatic #152683|Y
01|39936|1|1|Additional discount so customer can replace damaged|Y
01|39936|1|2|holder instead of sending in for evaluation.|Y
01|39940|4|1|Wrench is not included with holder.|Y
01|39948|1|1|Reference RGA# R-47213|Y
01|39948|1|2|1x BT50-UMT200|N
01|39948|4|1|Labor - $110.00/per hour. Quantity reflects 1.5 hours|Y
01|39948|4|2|of labor.|Y
01|39950|1|1|Waukesha 5C-AIR-CNC100  - Drawbar only (connecting rod)|Y
01|39957|1|1|2-pcs stock/10 pcs 2 weeks/Bal 13 weeks|Y
01|39957|2|1|3 stock/2-pcs 1 week/ Bal: 13 Weeks|Y
01|39993|46|1|D6310J001: Cylinder Housing|Y
01|39993|52|1|Labor charges include Heli-Coil rework on bolt holes|Y
01|39993|52|2|for the tilt worm shaft.|Y
01|39993|53|1|Option 1: Replace spindles|Y
01|39993|53|2|Total would be: $16099.00|Y
01|39993|54|1|Option 2: Re-plate and grind spindles.|Y
01|39993|54|2|Total would be $14979.00|Y
01|40026|1|1|Adapter plate A2-11 is included with Power Chuck.|Y
01|40026|2|1|3pcs required per Chuck|Y
01|40026|3|1|JFB-2612 Drawbar Assembly for Okuma V80R|Y
01|40029|1|1|Adapter plate A2-11 is included with Power Chuck. Must|Y
01|40029|1|2|add additional JFB-2614 Adapter Plate for V100R Okuma.|Y
01|40029|2|1|3pcs required per chuck ordered.|Y
01|40029|3|1|JFB-2613 Drawbar Assembly for Okuma V100R|Y
01|40029|4|1|JFB-2614 Adapter Plate for V100R Okuma|Y
01|40030|1|1|Reference RGA# R-47250|Y
01|40030|1|2|C40RA-0025 s/n: NA|N
01|40037|1|1|Hydraulic Brake|Y
01|40037|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|40037|3|2|holders.|Y
01|40038|1|1|Air Brakes|Y
01|40038|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|40038|2|2|holders.|Y
01|40053|2|1|21-pcs in stock once these are gone they will need|Y
01|40053|2|2|to be quoted as a special.|Y
01|40068|2|1|Non-Cancelable & Non-Returnable|Y
01|40069|5|1|**DIN - coolant through the flange|Y
01|40125|2|1|HSK100A-SK16-105-J is a SPECIAL. Delivery is|Y
01|40125|2|2|aprox 2 weeks from factory.|Y
01|40125|4|1|11 pcs. in stock/1 piece eta 1-2 weeks|Y
01|40125|6|1|ETA 4-5 weeks|Y
01|40125|13|1|ETA 1-2 weeks|Y
01|40125|33|1|ETA 1-2 weeks|Y
01|40182|25|1|USE GS-120155|N
01|40182|36|1|Expedite fee for completion within 1 week of receipt.|Y
01|40190|3|1|*not offered in 5.12 gl  --> quoted 6.30 gl|Y
01|40190|7|1|*not offered in 5.12 gl  --> quoted 4.72 gl|Y
01|40190|13|1|*HSK63A 1/8 SF is a special. *Quoted 5/8 SF holder|Y
01|40190|13|2|w/ 5/8 OD Straight Shank 1/8 ID extension|Y
01|40197|1|1|ETA 2-3 Weeks|Y
01|40204|2|1|This line is listed at your NET cost.|Y
01|40218|2|1|Non-Cancelable & Non-Returnable|Y
01|40224|1|1|Non-Cancelable & Non-Returnable|Y
01|40225|4|1|Pricing quoted for 2 or more chucks.|Y
01|40227|1|1|Reference RGA# T-47245|Y
01|40227|1|2|CNCZ401FA s/n: 10396|N
01|40228|1|1|Non-Cancelable & Non-Returnable|Y
01|40228|1|2|C50SF-32-160B with Balluff Chip Modi|Y
01|40228|1|3|The customer needs following:|Y
01|40228|2|1|Net Price Each|Y
01|40228|3|1|Net Price Each|Y
01|40228|4|1|Net Price Each|Y
01|40233|2|1|Balance of 3 pcs in 12-14 weeks|Y
01|40236|1|1|Includes cables|Y
01|40240|1|1|Nikken CNC-260FA-M to replace Troyke table on Hardinge|Y
01|40240|1|2|Troyke Table info (schematics for wiring) needed|Y
01|40240|1|3|Installation to include parameter changes and training|Y
01|40240|1|4|Confirmation of fit to machine required|Y
01|40240|1|5|Travel lodging included in Installation charge|Y
01|40243|1|1|Discount reflects purchase of 1 to 2 pieces.|Y
01|40243|2|1|Discount reflects purchase of 3 to 4 pieces.|Y
01|40243|3|1|Discount reflects purchase of 5 pieces.|Y
01|40250|3|1|Riser Plate for MT-170S to achieve 230mm center height.|Y
01|40250|3|2|Plate will attach to MT casting to make one piece unit.|Y
01|40250|3|3|Customer has option to source riser plate themselves.|Y
01|40252|1|1|Lyndex-Nikken has 2 pcs in stock and balance of 2|Y
01|40252|1|2|pieces would be 2 weeks.|Y
01|40259|1|1|Net Price Each|Y
01|40259|2|1|Net Price Each|Y
01|40259|3|1|Net Price Each|Y
01|40259|4|1|Net Price Each|Y
01|40259|5|1|Net Price Each|Y
01|40259|6|1|Net Price Each|Y
01|40259|7|1|Net Price Each|Y
01|40259|8|1|Net Price Each|Y
01|40259|9|1|Net Price Each|Y
01|40259|10|1|Net Price Each|Y
01|40259|11|1|Net Price Each|Y
01|40259|12|1|Net Price Each|Y
01|40259|13|1|Net Price Each|Y
01|40259|14|1|Net Price Each|Y
01|40259|15|1|Net Price Each|Y
01|40259|16|1|Net Price Each|Y
01|40259|17|1|Net Price Each|Y
01|40259|18|1|Net Price Each|Y
01|40269|1|1|Non-Cancelable & Non-Returnable|Y
01|40269|1|2|C50SF-32-160B with Balludd Chips|Y
01|40269|1|3|The customer needs following:|Y
01|40269|2|1|Net Price Each|Y
01|40269|3|1|Net Price Each|Y
01|40269|4|1|Net Price Each|Y
01|40270|1|1|Reference RGA# T-47244|Y
01|40270|1|2|CNCZ401FA s/n: 5405|N
01|40271|1|1|Non-Cancelable & Non-Returnable|Y
01|40283|2|1|Brake: Air|Y
01|40283|3|1|Includes field installtion cabling and drive amps|Y
01|40283|3|2|for table motors.|Y
01|40308|1|1|Air Brake|Y
01|40308|2|1|Air Brake|Y
01|40308|3|1|Includes: Drive amp bulk head cable sets external|Y
01|40308|3|2|cable sets fiber optic cable communication cables|Y
01|40308|3|3|travel and labor.|Y
01|40308|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|40308|4|2|holders.|Y
01|40309|2|1|Checking Stock Status.|Y
01|40312|2|1|500 PSI unit and hoses for table brake systems.|Y
01|40312|3|1|Includes: Dual axis drive amp bulk head cable sets|Y
01|40312|3|2|external cable sets fiber optic cable communication|Y
01|40312|3|3|cable travel and labor for installation.|Y
01|40317|3|1|Installation includes:Dual axis drive unit fiber optic|Y
01|40317|3|2|cables communications cables bulkhead cables|Y
01|40317|3|3|external cables I.O module  axis expansion card|Y
01|40317|3|4|parameter changes service time and travel.|Y
01|40321|1|1|Minimum order required 3ea|Y
01|40321|3|1|Minimum order required 3ea|Y
01|40322|1|1|2pcs in IL /1pc in Jpn-ETA 1-2 wks/balance aprox 10 wks|Y
01|40322|2|1|1pc in IL /3pcs in Jpn-ETA 1-2 wks/balance 5 weeks|Y
01|40322|3|1|9pcs in Japan /ETA 1-2 weeks|Y
01|40333|1|1|Reference RGA# R-47267|Y
01|40333|1|2|BT40-MOC1.1/4-160 s/n: Mhe-03002|N
01|40333|5|1|Spindle has grooves.  Must be re-plated and grinded.|Y
01|40333|5|2|Delivery for this modification will be 2-3 weeks.|Y
01|40333|7|1|M3X16L Cap Screw|Y
01|40347|1|1|Non-Cancelable & Non-Returnable|Y
01|40347|2|1|Non-Cancelable & Non-Returnable|Y
01|40350|2|1|500 PSI unit and hoses for table brake systems.|Y
01|40367|1|1|600MM table with Yaskawa motor and Haas cable set|Y
01|40367|2|1|Scale: Heidenhain +/-3 seconds scale with mounting kit|Y
01|40393|1|1|200MM High Speed Table with installation kit for S1000X|Y
01|40394|2|1|Installation: Dual axis drive unit bulkhead cables|Y
01|40394|2|2|external cables service time and travel.|Y
01|40394|2|3|Cooperation of Hurco Machine Tool is required.|Y
01|40399|2|1|This line is listed at your NET cost|Y
01|40404|2|1|Block made by Lyndex-Nikken|Y
01|40409|26|1|Please note this holder was brought in as a special|Y
01|40409|26|2|and we have 4pc remaining so we can offer these at a|Y
01|40409|26|3|special price. This holder is the same as|Y
01|40409|26|4|C5011-2000-4.00 except it is pre-balanced and|Y
01|40409|26|5|balanceable.|Y
01|40416|5|1|Discontinued & no quote for ZK12-3/8PU. Alt ZKG24-3.8PU|Y
01|40416|5|2|Would need ZK24 Tap Holder to use the ZKG24-3/8PU|Y
01|40419|2|1|TYPE 11-2 Tail Stock - Hydraulic|Y
01|40419|3|1|Special hydraulic unit set up for table brake and tail|Y
01|40419|3|2|stock operations.|Y
01|40419|4|1|Installation price is for Lyndex-Nikken to do full|Y
01|40419|4|2|installation.  Once the Machine make and model are|Y
01|40419|4|3|locked down installation cost can be more accurately|Y
01|40419|4|4|quoted.|Y
01|40426|1|1|Net Price Each|Y
01|40426|1|2|Non-Cancelable & Non-Returnable|Y
01|40426|2|1|Net Price Each|Y
01|40426|2|2|Non-Cancelable & Non-Returnable|Y
01|40426|3|1|Net Price Each|Y
01|40426|3|2|Non-Cancelable & Non-Returnable|Y
01|40431|1|1|To be hard balanced to 20000RPM|Y
01|40431|2|1|C4007-0032-3.13 to be Hard Balanced to 20000RPM|Y
01|40435|2|1|HSK100A-SK16-105-J is a SPECIAL. Delivery is|Y
01|40435|2|2|aprox 2 weeks from factory.|Y
01|40435|4|1|11 pcs. in stock/1 piece eta 1-2 weeks|Y
01|40435|6|1|ETA 4-5 weeks|Y
01|40435|13|1|ETA 1-2 weeks|Y
01|40435|33|1|ETA 1-2 weeks|Y
01|40436|3|1|500 PSI unit and hoses for Table and TAT brake systems.|Y
01|40436|4|1|***Optional***|Y
01|40436|5|1|***Optional***|Y
01|40437|3|1|500 PSI unit and hoses for Table and TAT brake systems.|Y
01|40437|4|1|***Optional***|Y
01|40440|1|1|ETA 2 weeks|Y
01|40440|3|1|ETA 2 weeks|Y
01|40440|6|1|ETA 2 weeks|Y
01|40448|1|1|Net Price Each|Y
01|40448|1|2|Non-Cancelable & Non-Returnable|Y
01|40453|3|1|500 PSI unit and hoses for Table and TAT brake systems.|Y
01|40453|4|1|***Optional*** (for use on CNC260)|Y
01|40453|5|1|***Optional*** (for use on TAT-250)|Y
01|40453|6|1|***Optional*** (for use on CNC260)|Y
01|40453|7|1|Installation would include: drive amp bulk head cable|Y
01|40453|7|2|set external cable set fiber optic cable|Y
01|40453|7|3|communication cable travel and labor.|Y
01|40453|7|4|**We must have Machine Make/Model and Data Sheets**|Y
01|40454|6|1|This line is listed at your NET cost|Y
01|40465|1|1|1 week for delivery|Y
01|40465|2|1|1 week for delivery|Y
01|40474|4|1|Nut wrench for live ER32|Y
01|40474|5|1|Spindle wrench for live ER32|Y
01|40474|6|1|Nut wrench for live ER25|Y
01|40474|7|1|Spindle wrench for live ER25|Y
01|40478|2|1|HSK100A-SK16-105-J is a SPECIAL. Delivery is|Y
01|40478|2|2|aprox 2 weeks from factory.|Y
01|40478|4|1|11 pcs. in stock/1 piece eta 1-2 weeks|Y
01|40478|6|1|ETA 4-5 weeks|Y
01|40478|13|1|ETA 1-2 weeks|Y
01|40478|33|1|ETA 1-2 weeks|Y
01|40483|4|1|ID Chip Holes only & with ID chips Holes & Installation|Y
01|40493|2|1|3 pcs. ETA 1 week|Y
01|40494|1|1|Reference RGA# R-47233|Y
01|40494|1|2|MNL12-ER32Z-MS s/n: A1257|N
01|40494|3|1|Collet nuts bearings seals and o-rings must be|Y
01|40494|3|2|replaced. Labor is included.|Y
01|40498|1|1|Reference RGA# R-47218|Y
01|40498|1|2|OKL3-ER32Z s/n: AL0354|N
01|40498|1|3|OKL3-ER32Z s/n: AL0355|N
01|40498|3|1|Collet nut bearings seals and o-rings must be|Y
01|40498|3|2|replaced. Labor is included.|Y
01|40498|5|1|OKLV3-ER32Z/AK119-11000 s/n: NA|N
01|40498|7|1|Collet nut bearings seals and o-rings must be|Y
01|40498|7|2|replaced. Labor is included.|Y
01|40510|1|2|Pratt & Whitney|Y
01|40518|3|1|Discount reflect 1 to 2 pieces.|Y
01|40518|4|1|Discount reflects 3 to 4 pieces.|Y
01|40518|5|1|Discount reflects 5 pieces|Y
01|40521|2|1|HSK63A-0187-3.00 is not a standard shelf item and would|Y
01|40521|2|2|have an extended lead time of 15 weeks. I recommend the|Y
01|40521|2|3|Balanceable alternative I have provided at greater|Y
01|40521|2|4|discount.|Y
01|40521|6|1|HSK63A-0312-3.00 is not a standard shelf item and would|Y
01|40521|6|2|have an extended lead time of 15 weeks. I recommend the|Y
01|40521|6|3|Balanceable alternative I have provided at greater|Y
01|40521|6|4|discount.|Y
01|40521|8|1|HSK63A-0312-5.00 is not a standard shelf item and would|Y
01|40521|8|2|have an extended lead time of 15 weeks. I recommend the|Y
01|40521|8|3|Balanceable alternative I have provided at greater|Y
01|40521|8|4|discount.|Y
01|40521|12|1|This is a non-standard stock item and will need to be|Y
01|40521|12|2|quoted from factory. Lead time would be aprox 15 weeks.|Y
01|40521|12|3|There is no Balanceable substitution at this time.|Y
01|40521|14|1|Balanceable substitution for HSK63A-0750-600|Y
01|40528|1|1|Non-Cancelable & Non-Returnable|Y
01|40528|2|1|Non-Cancelable & Non-Returnable|Y
01|40529|1|1|Non-Cancelable & Non-Returnable|Y
01|40540|2|1|CAPTO 5 ER16 Collet Chuck w 90mm gage length|Y
01|40546|1|1|SPECIAL PROMO CLOSEOUT PRICING ALLOWED|Y
01|40547|1|1|Non-Cancelable & Non-Returnable|Y
01|40553|4|1|BALANCE PENDING|Y
01|40555|3|1|To be hard balanced to 20000RPM|Y
01|40555|4|1|C4007-0032-3.13 to be Hard Balanced to 20000RPM|Y
01|40556|1|1|Please Note: Net price is based upon a purchase order|Y
01|40556|1|2|of five holders or more.|Y
01|40566|1|1|NEED TO CONFIRM CONTROL MODEL FANUC/MITSUBISHI|Y
01|40566|1|2|NEED TO CONFIRM IF MACHINE HAS DDRT INTERFACE|Y
01|40566|1|3|IF SO INSTALLATION PRICE WILL CHANGE|Y
01|40566|1|4|THIS QUOTE REFLECT FULL 4TH AXIS INTERFACE|Y
01|40566|1|5|INCLUDING HARDWARE TRAVEL TRAIN CABLES|Y
01|40567|1|1|NEED TO CONFIRM CONTROL MODEL FANUC/MITSUBISHI|Y
01|40567|1|2|NEED TO CONFIRM IF MACHINE HAS DDRT INTERFACE|Y
01|40567|1|3|IF SO INSTALLATION PRICE WILL CHANGE|Y
01|40567|1|4|THIS QUOTE REFLECT FULL 4TH AXIS INTERFACE|Y
01|40567|1|5|INCLUDING HARDWARE TRAVEL TRAIN CABLES|Y
01|40569|1|1|Air Brake|Y
01|40569|1|2|This table is for consignment at Gosiger-Indiana office|Y
01|40569|1|3|This table is new and has standard list price of sold.|Y
01|40569|1|4|To be installed and demoed on Hardinge V1000 VMC|Y
01|40590|3|1|#30 on attached drawing|Y
01|40590|4|1|#31 on attached drawing.|Y
01|40590|7|1|#33 Set Screw on drawing attached.|Y
01|40600|1|1|Reference RGA# R-47301|Y
01|40600|1|2|1x FP-2 sent in for evaluation/broken ceramic button|N
01|40600|4|1|CR2032: Cell Battery|Y
01|40600|5|1|Labor is $110.00/hour. Price reflects 2.5 hours of|Y
01|40600|5|2|labor.|Y
01|40619|24|1|ETA 11pcs. Approx 5 weeks|Y
01|40623|4|1|Non-Cancelable & Non-Returnable|Y
01|40626|1|1|HAAS motors and cables|Y
01|40629|1|1|Non-returnable & Non-cancelable|Y
01|40630|2|1|Chuck provided with blank draw screw|Y
01|40632|3|1|MI T-Wrench 170734 included|Y
01|40632|6|1|Nut Wrench for ER25I attachment|Y
01|40632|7|1|Spindle Wrench for ER25I attachment|Y
01|40633|1|1|1-4 pcs. discount at 32.00%|Y
01|40633|2|1|5-9pcs. discount at 40.00%|Y
01|40633|3|1|10pcs. discount at 42.00%|Y
01|40650|1|1|Reference RGA# T-47265|Y
01|40650|1|2|5AX-2002 s/n: 2151|N
01|40650|52|1|TCE-A6010(1)-J1|Y
01|40659|1|1|Delivery is pending at this time.|Y
01|40663|9|1|Installation of 5th axis only machine already has 4th|Y
01|40663|9|2|axis that is compatible|Y
01|40664|1|1|600MM High Speed Table with 12+1 Rotary Union|Y
01|40664|1|2|Motor not included. Nikken recommends motor with|Y
01|40664|1|3|straight shaft no keyway and with oil seal.|Y
01|40665|2|1|E16-Nut-Hex installed onto holder.|Y
01|40666|9|1|Installation of 5th axis only machine already has 4th|Y
01|40666|9|2|axis that is compatible|Y
01|40668|1|1|OKK TO PROVIDE INTERFACE 4+1|Y
01|40668|1|2|LYNDEXNIKKEN TO PROVIDE EXTERNAL CABLES AND SERVO MOTOR|Y
01|40678|1|1|w/ T-Slots|Y
01|40684|1|1|Table set up with HAAS motors and cables|Y
01|40684|1|2|AIR BRAKES|Y
01|40684|2|1|FREE 1 year extra warranty (2 years total)|Y
01|40684|3|1|FREE $1K Tooling Certificate good for list price tool|Y
01|40684|3|2|holders.|Y
01|40684|4|1|OPTIONAL - Would include travel and labor for on-site|Y
01|40684|4|2|parameter support. *Machine MUST have 4/5 interface|Y
01|40684|4|3|from HAAS installed prior to Lyndex-Nikken arrival.*|Y
01|40699|1|1|Non-Cancelable & Non-Returnable|Y
01|40709|1|1|ABOVE TABLE INCLUDES TCD-56013 4+1 ROTARY UNION|Y
01|40709|1|2|CONFIRMATION OF MACHINE NEEDED FOR INTERFACE|Y
01|40709|1|3|INSTALLATION 4+1 CONFIGURATION|Y
01|40712|1|1|Non-Cancelable & Non-Returnable|Y
01|40714|1|1|Rotary Axis|Y
01|40714|2|1|Rotary Axis|Y
01|40714|3|1|Tilting Axis|Y
01|40714|4|1|Tilting Axis|Y
01|40715|1|1|Reference RGA# R-47284|Y
01|40715|1|2|1x HP-150 - recalibrated|N
01|40715|3|1|Labor charges for re-calibration.|Y
01|40718|2|1|HSK63A-0187-3.00 is not a standard shelf item and would|Y
01|40718|2|2|have an extended lead time of 15 weeks. I recommend the|Y
01|40718|2|3|Balanceable alternative I have provided at greater|Y
01|40718|2|4|discount.|Y
01|40718|6|1|HSK63A-0312-3.00 is not a standard shelf item and would|Y
01|40718|6|2|have an extended lead time of 15 weeks. I recommend the|Y
01|40718|6|3|Balanceable alternative I have provided at greater|Y
01|40718|6|4|discount.|Y
01|40718|8|1|HSK63A-0312-5.00 is not a standard shelf item and would|Y
01|40718|8|2|have an extended lead time of 15 weeks. I recommend the|Y
01|40718|8|3|Balanceable alternative I have provided at greater|Y
01|40718|8|4|discount.|Y
01|40718|12|1|This is a non-standard stock item and will need to be|Y
01|40718|12|2|quoted from factory. Lead time would be aprox 15 weeks.|Y
01|40718|12|3|There is no Balanceable substitution at this time.|Y
01|40718|14|1|Balanceable substitution for HSK63A-0750-600|Y
01|40728|1|1|Repair of NC5-63-SZF16C-105|Y
01|40728|2|1|Minimum repair - Clean up and re-grease tool holder.|Y
01|40728|3|1|Replacement part for Zero Fit Holder|Y
01|40729|1|1|Reference RGA# R-47299|Y
01|40729|1|2|1x CAT50-C1-105U|N
01|40729|3|1|Labor charges for re-greasing.|Y
01|40731|7|1|Non-Cancelable & Non-Returnable|Y
01|40731|8|1|Non-Cancelable & Non-Returnable|Y
01|40733|1|1|Parts to make cable TCE-94275/1|Y
01|40736|2|1|1 pc. available now 1 pc. ETA approximately 10 wks.|Y
01|40745|1|1|Net Price Each|Y
01|40745|1|2|Non-Cancelable & Non-Returnable|Y
01|40746|5|1|*same as OKL2-ER20X-OFF|Y
01|40748|1|1|Holders to be modified with: HS Coolant Nuts Back up|Y
01|40748|1|2|Coolant Screws Coolant Tubes and Customer provided|Y
01|40748|1|3|Balluf ID Chips installed at Lyndex-Nikken.|Y
01|40748|2|1|Standard nut removal and HS Coolant Nut installed.|Y
01|40748|3|1|Customer provided Balluf ID Chip installed and holder|Y
01|40748|3|2|rebalanced.|Y
01|40748|4|1|Coolant Back-up screw and Coolant Tube installed.|Y
01|40748|10|1|Standard nut removal and HS Coolant Nut installed.|Y
01|40748|11|1|Customer provided Balluf ID Chip installed and holder|Y
01|40748|11|2|rebalanced.|Y
01|40748|12|1|Coolant Back-up screw and Coolant Tube installed.|Y
01|40748|18|1|Standard nut removal and HS Coolant Nut installed.|Y
01|40748|19|1|Customer provided Balluf ID Chip installed and holder|Y
01|40748|19|2|rebalanced.|Y
01|40748|20|1|Coolant Back-up screw and Coolant Tube installed.|Y
01|40750|1|1|Discount reflects one-time offer to replace old damaged|Y
01|40750|1|2|holder instead of sending them in for repair.|Y
01|40752|1|1|Reference RGA# T-47206|Y
01|40752|1|2|CNC250LFA s/n: 1657|N
01|40756|1|1|Discount for Pratt & Whitney|Y
01|40767|5|1|7pcs. in stock 4 pcs. ETA pending from factory.|Y
01|40771|1|1|200MM 4th & 5th tilt rotary table with Haas motors and|Y
01|40771|1|2|cable sets.|Y
01|40771|2|1|Installation of table onto the machine with parameter|Y
01|40771|2|2|changes.|Y
01|40778|1|1|Reference RGA# T-47078|Y
01|40778|1|2|1x P-170S|N
01|40790|2|1|Note 20% discount applies to qty break listed below|Y
01|40806|1|1|Reference RGA# R-47324|Y
01|40806|1|2|F90-C1.1/4AW-82|N
01|40817|1|1|This chuck does not come with hard jaws only soft|Y
01|40817|1|2|jaws.|Y
01|40817|7|1|Price is per piece|Y
01|40817|8|1|Jaw nut for H03M12 type J1|Y
01|40858|1|1|Reference RGA# T-47259|Y
01|40858|1|2|1x CNC250FA s/n: NA|N
01|40865|1|1|NEED TO CONFIRM CONTROL MODEL FANUC/MITSUBISHI|Y
01|40865|1|4|THIS QUOTE REFLECT FULL 4TH AXIS INTERFACE|Y
01|40865|1|5|INTERFACE INCLUDES TRAVEL MOTOR AMPLIFIERALL CABLES|Y
01|40867|1|1|Current Stock is for the cylinder type but we can make|Y
01|40867|1|2|switch over to 6mm Ball type for order.|Y
01|40874|1|1|Conversion: motor motor gear motor covermotor mount|Y
01|40874|1|2|power and feedback wireharness and labour.|Y
01|40874|2|2|Installation: Drive unit fiber optic cable short bar|Y
01|40874|2|3|communications cable bulkhead cables external cables|Y
01|40874|2|4|parameter changes service time and travel.|Y
01|40878|1|1|Table with Okuma Motors|Y
01|40878|2|1|This TAT will require a riser plate to match center|Y
01|40878|2|2|height of the CNC1201.|Y
01|40878|3|1|500 PSI unit and hoses for table brake system.|Y
01|40880|1|1|Current Stock is for the cylinder type but we can make|Y
01|40880|1|2|switch over to 6mm Ball type for order.|Y
01|40891|2|1|Not included with holder.|Y
01|40891|28|1|Burlington Engr. will provide drawing for retention|Y
01|40891|28|2|knob to be quoted. C50-STD is for budgetary purposes|Y
01|40891|28|3|only.|Y
01|40896|1|1|260MM Indexer with AA21 controller cables power cord|Y
01|40896|1|2|M-code cable and pendant included.|Y
01|40901|1|1|1-10 pcs. 20% discount|Y
01|40901|2|1|11-20pcs. 25% discount|Y
01|40905|2|1|Retention Knob pre-installed on Chuck from factory|Y
01|40916|1|1|Reference RGA# T-47320|Y
01|40916|1|2|TAT-320 s/n: 1368|N
01|40918|1|1|ETA 1 week upon firm reicept of PO.|Y
01|40920|1|1|ABOVE TABLE INCLUDES TCD-56013 4+1 ROTARY UNION|Y
01|40920|1|2|CONFIRMATION OF MACHINE NEEDED FOR INTERFACE|Y
01|40920|1|3|INSTALLATION 4+1 CONFIGURATION|Y
01|40936|1|1|Remainder due in 12-18-15|Y
01|40967|1|1|Additional discount quoted to have customer replace|Y
01|40967|1|2|holders instead of sending in for repair.|Y
01|40967|1|3|Quotation will not be valid should the customer decide|Y
01|40967|1|4|to send in their tool for repair.|Y
01|40970|3|1|Use for 7/8|Y
01|40971|2|1|B5016-0500-6.00 DIN burn for Flange Coolant capability|Y
01|40971|4|1|B5016-0500-6.00 DIN burn for Flange Coolant capability|Y
01|40971|6|1|B5016-0500-6.00 DIN burn for Flange Coolant capability|Y
01|40976|17|1|Substitute for above H63A-SF8-80. We have these in|Y
01|40976|17|2|stock with coolant ports. I can offer these to you at|Y
01|40976|17|3|same price.|Y
01|40976|23|1|HSK63A-SM1500-3.00 is Special I will advise price|Y
01|40976|23|2|and delivery shortly.|Y
01|40989|1|1|Non-Cancelable & Non-Returnable|Y
01|40990|2|1|Non-Returnable Non-Cancelable|Y
01|40990|2|2|May have issues of Epoxy backing out when running high|Y
01|40990|2|3|pressure coolant applications.|Y
01|40991|1|1|Comes in a syringe with 6g of Omega 73 grease.|Y
01|41024|1|1|Inspection fees for evaluation only of customer's|Y
01|41024|1|2|5AX-500FA-85 s/n: 1058.|Y
01|41024|1|3|Quotation for parts and labor will be sent after the|Y
01|41024|1|4|completion of the evaluation process.|Y
01|41038|1|1|1 pc. in stock  2 pcs. eta 12-10-2015|Y
01|41042|1|1|Reference RGA# T-47346|Y
01|41042|1|2|5AX-130SA s/n: NA|N
01|41050|20|1|Replaces part# CKFN1.1/4-1|Y
01|41053|1|1|Current Stock is for the cylinder type but we can make|Y
01|41053|1|2|switch over to 6mm Ball type for order.|Y
01|41070|2|1|*5pc min required|Y
01|41071|2|1|BT40-Q34-110|Y
01|41071|3|1|SP34-34-90|Y
01|41077|1|1|HYDRAULIC BRAKING|Y
01|41077|1|2|FANUC OIM CONTROL (NEED FANUC TO TURNON 5TH AXIS)|Y
01|41077|2|1|500 PSI unit and hoses for table brake systems.|Y
01|41077|3|1|Includes: Dual axis drive amps bulkhead cable sets|Y
01|41077|3|2|external cable sets fiber optic cable communication|Y
01|41077|3|3|cables travel and labor per machine|Y
01|41080|1|1|AIR BRAKE|Y
01|41080|1|2|4 + 1 CAPABLE NEED FANUC TO TURN ON 5TH AXIS|Y
01|41080|1|3|FANUC OIM CONTROL|Y
01|41080|4|1|Includes: Dual axis drive amps bulkhead cable sets|Y
01|41080|4|2|external cable sets fiber optic cable communication|Y
01|41080|4|3|cables travel and labor per machine|Y
01|41082|1|1|Budgetary quote for customer's 5AX-500FA-85 s/n: 1058|Y
01|41082|1|2|Customer: Jatco Mexico S.A. de C.V.|Y
01|41084|2|1|BALANCE IN 1-2 WEEKS|Y
01|41112|1|1|Holders to be modified with: HS Coolant Nuts|Y
01|41112|1|2|Coolant Tubes and Customer provided|Y
01|41112|1|3|Balluf ID Chips installed at Lyndex-Nikken.|Y
01|41112|2|1|Standard nut removal and HS Coolant Nut installed.|Y
01|41112|3|1|Customer provided Balluf ID Chip installed and holder|Y
01|41112|3|2|rebalanced.|Y
01|41112|4|1|Coolant Back-up screw and Coolant Tube installed.|Y
01|41112|9|1|Holders to be modified with: HS Coolant Nuts|Y
01|41112|9|2|Coolant Tubes and Customer provided|Y
01|41112|9|3|Balluf ID Chips installed at Lyndex-Nikken.|Y
01|41112|10|1|Standard nut removal and HS Coolant Nut installed.|Y
01|41112|11|1|Customer provided Balluf ID Chip installed and holder|Y
01|41112|11|2|rebalanced.|Y
01|41112|12|1|Coolant Back-up screw and Coolant Tube installed.|Y
01|41112|17|1|Holders will be modified with Hi-Speed coolant nuts|Y
01|41112|17|2|HSK63-Tube and customer supplied Baluf chips.|Y
01|41112|18|1|Standard nut removal and HS Coolant Nut installed.|Y
01|41112|19|1|Customer provided Balluf ID Chip installed and holder|Y
01|41112|19|2|rebalanced.|Y
01|41112|20|1|Coolant Back-up screw and Coolant Tube installed.|Y
01|41115|5|1|This line is listed at your NET cost|Y
01|41123|1|1|Reference RGA# Q-47351|Y
01|41123|1|2|MZST68-MI50Z s/n: 60822 01|N
01|41123|3|1|Bearings seals and o-rings must be replaced.|Y
01|41123|3|2|MI50 Spindle assembly must be replaced.|Y
01|41123|3|3|Labor is included.|Y
01|41124|1|1|21 pcs. avaialable.  15 pcs. eta 1 week upon reciept|Y
01|41124|1|2|of firm PO|Y
01|41149|1|1|Includes shrink fit unit 10 standard GL HSK63F holders|Y
01|41149|1|2|and 2 HSK63F shrink fit pots.|Y
01|41161|16|1|240 Volt Power|Y
01|41161|17|1|480 Volt Power|Y
01|41163|1|1|Non-Cancelable & Non-Returnable|Y
01|41173|1|1|Reference RGA# R-47367|Y
01|41173|1|2|OKL3-ER32X s/n: AL0124|N
01|41173|3|1|Collet nut and gears need to be replaced. Bearings|Y
01|41173|3|2|seals and o-rings must also be replaced. Labor is|Y
01|41173|3|3|included.|Y
01|41194|1|1|Reference RGA# R-47354|Y
01|41194|1|2|1x W1505-0875-8.24|N
01|41194|11|1|Labor is $110.00/hour. Price reflects 2.5 hours of|Y
01|41194|11|2|labor.|Y
01|41211|1|1|Replaces old part# S62SF-4-4.00-3|Y
01|41211|3|1|*Instead of 5/8 OD shank we have an 3/4 OD shank|Y
01|41211|3|2|w/ 6 overall length   *additional discount applies|Y
01|41211|5|1|*Instead of 5/8 OD shank we have an 16mm OD shank|Y
01|41211|5|2|w/ 6.29 overall length|Y
01|41220|1|1|1-Table only twin spindle with backhand mounted motor|Y
01|41220|1|2|with TC32BN installtion kit|Y
01|41229|1|1|1-Table only twin spindle with backhand mounted motor|Y
01|41229|1|2|with TC32B installation kit|Y
01|41243|3|1|BT50-FMB22-150|Y
01|41243|4|1|BT50-FMB22-250|Y
01|41243|5|1|NBT50-HC12-165|Y
01|41243|6|1|NBT50-HC22-165|Y
01|41243|7|1|NBT50-HC22-195|Y
01|41243|10|1|BT50-SK13-120|Y
01|41243|11|1|BT50-SK13-165|Y
01|41243|12|1|BT50-SK20-165|Y
01|41251|1|1|C40RAM-ER25-180IC-65TP Internal Coolant Thru|Y
01|41257|1|1|Includes Motor and Cables|Y
01|41258|1|1|MCA40F-32U has SL nut dimmensions and 5/8-11 threading.|Y
01|41258|1|2|Special Promo Discount has been applied for this quote.|Y
01|41267|7|1|Installation: Dual axis drive unit communications|Y
01|41267|7|2|cable firber optic cables short bar bulkhead cables|Y
01|41267|7|3|external cables service time and travel.|Y
01|41277|1|1|Wedge Plunger for HW-06C-LS|Y
01|41279|3|1|Non-Cancelable & Non-Returnable|Y
01|41282|2|1|Slightly used inventory|Y
01|41282|6|1|Balance in 10-12 weeks|Y
01|41282|9|1|Balance in 1-2 weeks|Y
01|41285|1|1|GL 1.77''|Y
01|41285|1|2|Non-Cancelable & Non-Returnable|Y
01|41285|2|1|Non-Cancelable & Non-Returnable|Y
01|41285|3|1|Non-Cancelable & Non-Returnable|Y
01|41285|25|1|Non-Cancelable & Non-Returnable|Y
01|41290|22|1|This line at no charge as a courtesy to the customer|Y
01|41290|23|1|This line at no charge as a courtesy to the customer|Y
01|41290|24|1|This line at no charge as a courtesy to the customer|Y
01|41290|25|1|50% off with purchase of ER16 collet set|Y
01|41290|26|1|50% off with purchase of ER20 collet set|Y
01|41290|27|1|50% off with purchase of ER25 collet set|Y
01|41290|28|1|50% off with purchase of R8 collet set|Y
01|41299|1|1|Includes:|Y
01|41299|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|41299|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|41299|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|41299|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|41299|1|6|1x C4006-1000-4.00     1 EMH|Y
01|41299|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|41299|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|41299|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|41299|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|41299|3|1|Includes:|Y
01|41299|3|2|1x C4001-1000-1.75  1 SMH|Y
01|41299|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|41299|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|41299|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|41299|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|41299|3|7|1x C4006-1000-4.00    1 EMH|Y
01|41299|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|41299|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|41299|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|41302|1|1|Delivery 2-3 weeks|Y
01|41306|1|1|Reference RGA# R-47394|Y
01|41306|1|2|1x FP-2|N
01|41306|4|1|Labor is $110.00/hour. Price reflects 1.5 hours of|Y
01|41306|4|2|labor.|Y
01|41308|1|1|Reference RGA# R-47388|Y
01|41308|1|2|1x T40U-NX5|N
01|41309|1|1|Reference RGA# R-47386|Y
01|41309|1|2|1x NCAT40-C1-85U|N
01|41309|6|1|Labor is $110.00/hour. Price reflects 1.5 Hours of|Y
01|41309|6|2|labor.|Y
01|41320|1|1|Reference RGA# R-47357|Y
01|41320|1|2|1x HP-6|N
01|41320|4|1|LR44 Batteries need to be replaced.|Y
01|41320|5|1|Labor is $110.00/hour. Price reflects 1.5 Hours of|Y
01|41320|5|2|labor.|Y
01|41326|12|1|32mm EMH to hold K32-MMC8 extensions|Y
01|41336|1|1|Discount is based upon a purchase order for 100 pieces|Y
01|41336|1|2|to 199 pieces.|Y
01|41336|2|1|Discount is based upon a purchase order for 200 pieces|Y
01|41336|2|2|to 299 pieces.|Y
01|41336|3|1|Discount is based upon a purchase order for 300+|Y
01|41336|3|2|pieces.|Y
01|41339|11|1|Crossover of Command part# B2E4-0250|Y
01|41339|12|1|Crossover of Command part# RB2M-0001-C|Y
01|41340|1|1|Reference RGA# T-47311|Y
01|41340|1|2|5AX-2MT-105-120FA-M s/n: 8246|N
01|41343|1|1|Quoted without coolant collector.|Y
01|41357|1|1|2pcs. ETA 1 week. 3pcs. ETA 13 weeks|Y
01|41364|4|1|*2-Hole Coolant Ports 2mm id holes|Y
01|41370|2|1|1 free pull stud for every 1 tool holder purchased!|Y
01|41375|1|1|5 pcs. ETA 1 week upon firm reciept of PO|Y
01|41389|1|1|PART-MIM-185247: Price reflects purchase of only ONE|Y
01|41389|1|2|taper pin.|Y
01|41389|2|1|PART-MIM-185247: Price reflects purchase of TWO or more|Y
01|41389|2|2|taper pins.|Y
01|41393|16|1|240 Volt Power|Y
01|41393|17|1|480 Volt Power|Y
01|41393|17|2|Same price as 240V. Part # reference.|Y
01|41402|4|1|Coolant nut installed in holder.|Y
01|41402|5|1|Coolant nut installed in holder.|Y
01|41405|1|1|Please note this angle head must be run with coolant|Y
01|41405|1|2|at all times.|Y
01|41420|3|1|$1000.00 Free Tooling Promotion|Y
01|41437|2|1|Note the longest gage available is 6|Y
01|41446|2|1|*10pc min|Y
01|41449|1|1|Tooling Certificate Number: 25000-711-120715|Y
01|41451|1|1|Reference RGA# T-47405|Y
01|41451|1|2|CNC-100LA s/n: 8074|N
01|41478|2|1|For Haas Machine|Y
01|41478|2|2|Lyndex-Nikken to make the block|Y
01|41478|2|3|*quoted at net price|Y
01|41478|10|1|*Direct chucking 1.1/4 tool|Y
01|41482|1|1|Reference RGA# T-47375|Y
01|41482|1|2|5AX-2MT-105-120SABR s/n: 8244|N
01|41486|1|1|CNC180LSA-BR-QT - 2 Table kit|Y
01|41487|2|1|Installation kit: Drive unit short bar communications|Y
01|41487|2|2|cable fiber optic cable & external cable set.|Y
01|41503|4|1|NIK-IW0126-900S|Y
01|41503|6|1|NIK-IW0126-1100K|Y
01|41503|7|1|NIK-IW0126-700S|Y
01|41503|9|1|Price quoted per Steve Lenihan.|Y
01|41504|11|1|Non-Cancelable & Non-Returnable|Y
01|41504|12|1|Non-Cancelable & Non-Returnable|Y
01|41504|13|1|Non-Cancelable & Non-Returnable|Y
01|41508|1|1|Net Price Each|Y
01|41508|1|2|Non-Cancelable & Non-Returnable|Y
01|41508|2|1|Net Price Each|Y
01|41508|2|2|Non-Cancelable & Non-Returnable|Y
01|41508|3|1|Net Price Each|Y
01|41508|3|2|Non-Cancelable & Non-Returnable|Y
01|41508|4|1|Net Price Each|Y
01|41508|4|2|Non-Cancelable & Non-Returnable|Y
01|41508|5|1|Net Price Each|Y
01|41508|5|2|Non-Cancelable & Non-Returnable|Y
01|41508|6|1|Net Price Each|Y
01|41508|6|2|Non-Cancelable & Non-Returnable|Y
01|41509|1|1|Reference RGA# R-47387|Y
01|41509|1|2|CAT40U-AFC3/4-205-90 s/n: AZK-10373|N
01|41510|1|1|FOR INDEXING ONLY USING EXTERNAL CONTROLLER|Y
01|41510|1|2|.001/1 SEC DEGREE OF INDEXING|Y
01|41510|1|3|WORKHOLDING BASED ON PART BEING HELD ON ID|Y
01|41514|4|1|Includes: Bulk head cable set External cables set|Y
01|41514|4|2|parameter changes service time & travel|Y
01|41514|4|3|For Doosan DNM500l|Y
01|41528|1|1|This item has been discontinued-|Y
01|41528|1|2|Replaced with p/n:C40-1500-MORI|Y
01|41551|2|1|500 PSI unit and hoses for table braking systems.|Y
01|41551|3|1|Free $1K value Tooling Certificate good for list price|Y
01|41551|3|2|tool holders.|Y
01|41564|8|1|5AX-2MT-105-120FA-M with MOTORS|Y
01|41564|8|2|ROTARY UNION (PNEUMATIC)4 NEEDED|Y
01|41564|8|3|CABLE LENGTH POWER/FEEDBACK LENGTH TO BE DETERMINED|Y
01|41564|8|4|DELIVERY PENDING CHECKING AVAILABILITY|Y
01|41565|1|1|Techniks gage length is 2.75|Y
01|41565|1|2|Lyndex-Nikken offers this in 3|Y
01|41567|1|1|Drawscrew is a blank|Y
01|41580|5|1|Internal Feedback Cables (Rotary/Tilt)|Y
01|41580|6|1|Internal Power/Signal Cables (Rotary/Tilt)|Y
01|41580|7|1|Labor to Modify Convers and install new wire harness.|Y
01|41585|2|1|Includes bulk head cable sets external cable sets|Y
01|41585|2|2|Fiber optic cable communication cables drvie amp|Y
01|41585|2|3|travel and labor for interface and installation.|Y
01|41585|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|41585|3|2|holders.|Y
01|41587|2|1|Includes drive amp bulk head cable sets external|Y
01|41587|2|2|cable sets fiber optic cables communication cables|Y
01|41587|2|3|travel and labor for interface and installation.|Y
01|41587|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|41587|3|2|holders.|Y
01|41611|1|1|Item is quoted in NET PRICE|Y
01|41612|1|1|Non-Cancelable & Non-Returnable|Y
01|41644|1|1|Replaces the A06B-0223-B000|Y
01|41646|1|1|Reference RGA# R-47424|Y
01|41646|1|2|1x PF-2|N
01|41646|4|1|Labor is $110.00/Hour. Price reflects 1.5 Hours of|Y
01|41646|4|2|labor.|Y
01|41647|1|1|260MM table with shortest cover available|Y
01|41647|3|1|Special cables with VX1000 pin out|Y
01|41647|4|1|Special cables with VX1000 pin out|Y
01|41647|5|1|Installation assistance with parameter settings|Y
01|41651|1|1|Balance ETA 12/18|Y
01|41655|12|1|*use for 27/64|Y
01|41655|23|1|*use for 27/64|Y
01|41683|2|1|Discount Reflects 1pc price|Y
01|41683|3|1|Discount reflects 2pc price|Y
01|41683|4|1|Discount reflects 3pc price|Y
01|41684|3|1|Includes: Drive unit bulkhead cables external cables|Y
01|41684|3|2|communications cables fiber optic cable service time|Y
01|41684|3|3|and travel.|Y
01|41684|3|4|MACHINE DATA SHEETS REQUIRED DOOSAN DNM500II|Y
01|41691|1|1|This is a table and motor only.|Y
01|41691|3|1|This is a table only (no motor)|Y
01|41692|2|1|Includes drive amp bulk head cable sets external|Y
01|41692|2|2|cable sets fiber optic cable communication cable|Y
01|41692|2|3|travel and labor for installation.|Y
01|41693|2|1|Includes drive amp bulk head cable sets external|Y
01|41693|2|2|cable sets fiber optic cables communication cable|Y
01|41693|2|3|travel and labor for installation.|Y
01|41694|1|1|Table with HAAS motor and cable|Y
01|41694|2|1|Includes: Travel and labor for help with hooking up the|Y
01|41694|2|2|external cables and parameter changes on HAAS machine.|Y
01|41710|1|1|Reference RGA# R-47385|Y
01|41710|1|2|1x NC5-63-SZF16C-105|N
01|41710|3|1|Labor charges for evaluation and re-greasing.|Y
01|41721|1|1|Balance in 1 week.|Y
01|41722|17|1|Substitute for PS-1|Y
01|41724|1|1|Net Price Each|Y
01|41724|1|2|Non-Cancelable & Non-Returnable|Y
01|41724|2|1|Net Price Eacy|Y
01|41724|2|2|Non-Cancelable & Non-Returnable|Y
01|41754|1|1|Table will be ready to ship 1-2 days after PO receipt|Y
01|41776|2|1|500 PSI unit and hoses for table brake systems only.|Y
01|41776|4|1|Installation Kit: dual axis drive bulk head cable set|Y
01|41776|4|2|external cable set fiber optic cable communication|Y
01|41776|4|3|cable.|Y
01|41776|5|1|Free $1K Tooling Certificate good for list price tool|Y
01|41776|5|2|holders.|Y
01|41777|17|1|Substitute for PS-1|Y
01|41783|1|1|Quoted as net price.|Y
01|41783|7|1|Replacement for B50R5-0875-3.86(C) except holder is not|Y
01|41783|7|2|coolant capable.|Y
01|41798|4|1|**Coolant Ports|Y
01|41839|3|1|Free $1000.00 Tooling Promotion|Y
01|41881|2|1|Chip Hole Modification price included in shell mill|Y
01|41881|2|2|holder price.|Y
01|41881|3|1|Coolant port modification price included with shell|Y
01|41881|3|2|mill holder price.|Y
01|41881|4|1|HSK100 Tube installed in SM holder at no charge.|Y
01|41886|2|1|Net charge|Y
01|41886|2|2|Lyndex-Nikken to make position block upon receipt|Y
01|41886|2|3|of machine/model spindle information|Y
01|41897|1|1|Budgetary quote for repair of CNC501TFA|Y
01|41897|1|2|Please note this is just an estimate.|Y
01|41897|1|3|Actual cost cannot be determined until we have the|Y
01|41897|1|4|for evaluation.|Y
01|41903|1|1|Includes:|Y
01|41903|1|2|1x C4006-0250-2.50   1/4 EMH|Y
01|41903|1|3|1x C4006-0375-2.50   3/8 EMH|Y
01|41903|1|4|1x C4006-0500-2.50   1/2 EMH|Y
01|41903|1|5|1x C4006-0750-3.00   3/4 EMH|Y
01|41903|1|6|1x C4006-1000-4.00     1 EMH|Y
01|41903|1|7|2x C4007-0016-3.50   ER16 Collet Chuck  and wrench|Y
01|41903|1|8|2x C4007-0032-3.13   ER32 Collet Chuck  and wrench|Y
01|41903|1|9|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|41903|1|10|ER32 Collets: 1/4 5/16 3/8 1/2 5/8 3/4|Y
01|41903|3|1|Includes:|Y
01|41903|3|2|1x C4001-1000-1.75  1 SMH|Y
01|41903|3|3|1x C4006-0250-2.50  1/4 EMH|Y
01|41903|3|4|1x C4006-0375-2.50  3/8 EMH|Y
01|41903|3|5|1x C4006-0500-2.50  1/2 EMH|Y
01|41903|3|6|1x C4006-0750-3.00  3/4 EMH|Y
01|41903|3|7|1x C4006-1000-4.00    1 EMH|Y
01|41903|3|8|3x C4007-0016-3.50  ER16 Collet Chuck and wrench|Y
01|41903|3|9|3x C4007-0032-3.13  ER32 Collet Chuck and wrench|Y
01|41903|3|10|ER16 Collets: 1/8 3/16 1/4 5/16 3/8|Y
01|41906|3|1|*Lyndex-Nikken to make block upon receipt of|Y
01|41906|3|2|confirmation of machine/model spindle drawing info|Y
01|41908|3|1|This line is listed at your NET cost|Y
01|41911|1|1|Direct mount cable set with protective plastic conduit|Y
01|41911|2|1|Direct Mount Cable without plastic conduit|Y
01|41916|3|1|Includes: drive amp bulk head cable set external|Y
01|41916|3|2|cable set fiber optic cable communication cable|Y
01|41916|3|3|travel and labor for installation.|Y
01|41916|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|41916|4|2|holders.|Y
01|41918|7|1|INSTALLATION BASED UPON HAAS ALREADY HAS 4TH AXIS|Y
01|41918|7|2|MACHINE TO HAVE AMP CABLING CONNECTORS|Y
01|41920|1|1|Reference RGA# R-47425|Y
01|41920|1|2|1x PF-2|N
01|41920|7|1|LR1 Batteries must be replaced.|Y
01|41928|2|1|This line is listed at your NET cost|Y
01|41929|1|1|Reference RGA# T-47382|Y
01|41929|1|2|CNC250YA s/n: 2798|N
01|41934|7|1|INSTALLATION BASED UPON HAAS ALREADY HAS 4TH AXIS|Y
01|41934|7|2|MACHINE TO HAVE AMP CABLING CONNECTORS|Y
01|41939|1|1|Tooling Certificate Number: 13435-709-120415RT|Y
01|41946|3|1|Non-Cancelable & Non-Returnable|Y
01|41953|4|1|CNC202YA-M includes Servo Motor|Y
01|41953|4|2|Machine Matsuura 510VG W/J300 Yasnac Control|Y
01|41954|1|1|Can be set up for either air or hydraulic braking|Y
01|41954|3|1|500 PSI unit and hoses for table brake systems.|Y
01|41954|3|2|***Optional***|Y
01|41955|1|1|Net Price Each|Y
01|41955|1|2|Non-Cancelable & Non-Returnable|Y
01|41955|2|1|Net Price Each|Y
01|41955|2|2|Non-Cancelable & Non-Returnable|Y
01|41955|4|1|Net Price Each|Y
01|41955|4|2|Non-Cancelable & Non-Returnable|Y
01|41955|6|1|Net Price Each|Y
01|41955|6|2|Non-Cancelable & Non-Returnable|Y
01|41958|2|1|ADDITIONAL 25MM RISER MAY BE NEEDED PER APPLICATION|Y
01|41958|3|1|SGMG-05A2ADS MOTOR TO BE USED|Y
01|41958|3|2|OPTION EXISTING MOTOR FROM 5 AXIS TABLE MAY BE USED|Y
01|41958|3|3|CONFIRMATION OF CABLE SCHEMATIC NEEDED|Y
01|41958|4|2|CONFIRMATION OF cable length and schematic needed|Y
01|41958|6|1|ADDIITIONAL 25MM MAY BE NEEDED PER APPLICATION|Y
01|41963|1|1|HW-D63-KW6 Special Howa Jaws Fits on HW-06C-LS P-Chuck|Y
01|41963|1|2|1 Set = 3pcs.|Y
01|41974|1|1|Reference RGA# R-47392|Y
01|41974|1|2|CAT50U-AFC1.1/4-230 s/n: ACL-08874|N
01|41977|1|1|Reference RGA# T-47400|Y
01|41977|1|2|CNCZ180-LYA-BR s/n: 10030|N
01|41980|1|1|AC5-ECH7F-90  ER11 Collet Chuck|Y
01|41980|2|1|AC5-ECH10F-60   ER16 Collet Chuck|Y
01|41980|3|1|AC5-ECH10F-90  ER16 Collet Chuck|Y
01|41984|2|1|Net price quoted.|Y
01|41984|4|1|Net price quoted.|Y
01|41984|8|1|Quoted at Net Pricing.|Y
01|41990|3|1|SPECIAL PRICING GIVEN|Y
01|41995|5|1|Custom stopping block|Y
01|41995|6|1|Installation labor and expenses.|Y
01|42007|1|1|Reference RGA# R-47427|Y
01|42007|1|2|BT40-MOC1.1/4-160 s/n: Mib-03001|N
01|42007|3|1|Spindle has grooves and must be re-surfaced.|Y
01|42007|3|2|Modification will be completed in 2-3 weeks.|Y
01|42012|1|1|SRM-25.5  Nikken Reamers|Y
01|42012|2|1|SRM-26.0  Nikken Reamers|Y
01|42012|3|1|SRM-27.0  Nikken Reamers|Y
01|42019|1|1|This line is listed at your NET cost.|Y
01|42028|1|1|Discount reflects a purchase order of 3 or more tools.|Y
01|42029|1|1|Discount reflects a purchase order of 3 or more tools.|Y
01|42032|1|1|2-CNCZ202LSABR2 tables with installation kit for the|Y
01|42032|1|2|Brother R650X1 machine.|Y
01|42034|1|1|260MM face plate with Haas motor and cable set|Y
01|42034|2|1|$1000.00 free tooling promo|Y
01|42037|1|1|2-CNCZ180LSABR2 High Speed Tables with instalaltion|Y
01|42037|1|2|kit for Brother R450X1 machine.|Y
01|42058|1|1|Non-Cancelable & Non-Returnable|Y
01|42068|1|1|Package includes shrink fit unit 10 standard GL HSK63A|Y
01|42068|1|2|SF holders and 2 HSK63A SF pots|Y
01|42078|1|1|Discount reflects a purchase order of 3 or more tools.|Y
01|42098|3|1|DIRECT REPLACEMENT FOR EXISTING NIKKEN TABLES|Y
01|42098|3|2|FA DESIGNATION WITHOUT SERVO MOTORS|Y
01|42098|5|1|TABLE COMES WITH FANUC SERVO MOTORS|Y
01|42113|1|1|Reference RGA# R-47418|Y
01|42113|1|2|2x HP-6|N
01|42113|5|1|76A Batteries must be replaced.|Y
01|42116|1|1|Discount relects 1 to 24 pieces.|Y
01|42116|2|1|Discount relects 25 to 49 pieces|Y
01|42116|3|1|Discount reflects 50+ pieces.|Y
01|42120|1|1|RGA# T-47432|N
01|42120|1|2|5AX-2002 s/n: NA|N
01|42127|1|1|Above item is non-returnable or non-cancellable.|Y
01|42133|1|1|RGA# T-47431|N
01|42133|1|2|5AX-2002 s/n: NA|N
01|42138|1|1|Reference RGA# R-47456|Y
01|42138|1|2|1x C5005-0875-5.66|N
01|42147|2|1|Non-Cancelable & Non-Returnable|Y
01|42150|1|1|Reference RGA# R-47430|Y
01|42150|1|2|MNL12-ER32Z s/n: A0561|N
01|42150|3|1|Collet nut spindle bearings seals and o-rings must|Y
01|42150|3|2|be replaced. Labor is included.|Y
01|42156|1|1|Reference RGA# T-47389|Y
01|42156|1|2|5AX-2MT-105-120FA s/n: 8070|N
01|42166|1|1|centerline of CNC-180 is 135mm|Y
01|42166|1|2|centerline of tailstock 140-160mm|Y
01|42166|1|3|subplate will be needed not included|Y
01|42168|3|1|Includes: drive amp bulk head cable set external|Y
01|42168|3|2|cable set fiber optic cable communication cable|Y
01|42168|3|3|travel and labor for installation.|Y
01|42182|1|1|Reference RGA# R-47376|Y
01|42182|1|2|B50RAM-ER40-225 s/n: 55088|N
01|42182|3|1|Bearings seals and o-rings are worn and must be|Y
01|42182|3|2|replaced. BT50 Input Spindle and ER40 Spindle are|Y
01|42182|3|3|damaged and must be replaced. Labor is included.|Y
01|42185|1|1|Reference RGA# R-47447|Y
01|42185|1|2|T32386 s/n: A0004|N
01|42185|3|1|Collet nuts and spindle are damaged and must be|Y
01|42185|3|2|replaced. Bearings seals and o-rings are worn and must|Y
01|42185|3|3|be replaced. Labor is included.|Y
01|42198|8|1|Non-Cancelable & Non-Returnable|Y
01|42198|12|1|Non-Cancelable & Non-Returnable|Y
01|42208|1|1|1-4pcs discount at 32%|Y
01|42208|2|1|5-7pcs discount at 40%|Y
01|42217|1|1|Reference RGA# R-47331|Y
01|42217|1|2|OKL3-ER32X s/n: AL901|N
01|42217|3|1|Bearings seals and o-rings are worn and must be|Y
01|42217|3|2|replaced. Gears collet nut and clutch are worn and|Y
01|42217|3|3|must be replaced. Labor is included.|Y
01|42223|4|1|Coolant nut installed in holder.|Y
01|42223|5|1|Coolant nut installed in holder.|Y
01|42241|1|1|Replaces SGMG09A2AB|Y
01|42241|2|1|Replaces GM19S0550151848|Y
01|42241|5|1|Conversion of CNC100-4W-120FA to CNCZ100-4W-120YA|N
01|42241|5|2|Rotary table serial number: 8013|N
01|42254|1|1|Reference RGA# R-47485|Y
01|42254|1|2|2x HSK100A-C1-135|N
01|42254|3|1|Labor charges for inspection of both holders and|Y
01|42254|3|2|re-greasing of one HSK100A-C1-135.|Y
01|42291|1|1|NBT50-C1.1/4-90 Dual Contact Milling Chuck|Y
01|42291|1|2|Any quantity discount applied|Y
01|42291|2|1|NBT50-C2-105 Dual Contact Milling Chuck|Y
01|42291|2|2|Any quantity discount applied|Y
01|42303|7|1|BALANCE ETA 3-4 WEEKS|Y
01|42303|10|1|BALANCE ETA 1/18/16|Y
01|42311|1|1|CAT40-SK10-230U|Y
01|42311|2|1|CAT40-SK10-230U|Y
01|42311|3|1|NCAT40-SK10-230U|Y
01|42311|4|1|NCAT40-SK10-230U|Y
01|42319|1|1|Reference RGA# R-47457|Y
01|42319|1|2|2x CAT40-C3/4-85U - Sent in for evaluation.|N
01|42328|1|1|Option #1 (7.087 Diameter Faceplate)|Y
01|42328|2|1|Option #2 (7.874 Diameter Faceplate)|Y
01|42328|3|1|Includes: drive amp bulk head cable set external|Y
01|42328|3|2|cable set fiber optic cable communication cable|Y
01|42328|3|3|travel and labor for installation.|Y
01|42330|2|1|This line at no charge as a courtesy to the customer.|Y
01|42332|2|1|Includes: drive amp bulk head cable set external|Y
01|42332|2|2|cable set fiber optic cable communication cable|Y
01|42332|2|3|travel and labor for installation.|Y
01|42338|1|1|Equivalent 7.075.068|Y
01|42338|3|1|Equivalent 7.075.485|Y
01|42338|4|1|Equivalent 7.075.515|Y
01|42338|5|1|Equivalent 7.075.521|Y
01|42342|2|1|Installation Kit - Includes: Drive amp and cabling|Y
01|42353|1|1|Reference RGA# R-47428|Y
01|42353|1|2|MNL12-ER32Z s/n: A1556|N
01|42353|3|1|Collet nut must be replaced. Bearings seals and o-ring|Y
01|42353|3|2|must be replaced. Labor is included.|Y
01|42357|2|1|Installation Hwacheon Sirius UL: Drive unit bulkhead|Y
01|42357|2|2|cable set short bar communications cable fiber optic|Y
01|42357|2|3|cable external cable set service time and travel|Y
01|42358|4|1|Air/Hyd booster for the CNC401FA-M|Y
01|42358|5|1|Makino F9 installtion: Drive unit bulkhead cables|Y
01|42358|5|2|short bar communications cable fiber optic cable|Y
01|42358|5|3|external cables service time and travel.|Y
01|42362|1|1|Option #1 - Includes HAAS motor and cable|Y
01|42362|2|1|Option #2 - Includes HAAS motor and cable|Y
01|42362|3|1|Option #3 - Includes HAAS motor and cable|Y
01|42364|1|1|Guaranteed Trail/Discount reflects non returnable|Y
01|42364|1|2|tooling.|Y
01|42365|1|1|Above holder to be DIN modified|Y
01|42370|1|1|Remaining 5pc ETA 12-13WK|Y
01|42372|2|1|Installation Kit - Includes: drive amp bulk head cable|Y
01|42372|2|2|set external cable set fiber optic cable and|Y
01|42372|2|3|communication cable.|Y
01|42375|3|1|Modification of face plate: Add pattern provided by|Y
01|42375|3|2|Honda EGA. Includes  program set up amd machining of|Y
01|42375|3|3|face plate in the US.|Y
01|42380|1|1|Reference RGA# T-47452|Y
01|42380|1|2|CNC501TFA s/n: 6102|N
01|42390|6|1|This line at no charge as a courtesy to the customer|Y
01|42390|7|1|This line at no charge as a courtesy to the customer|Y
01|42392|2|1|Installation Kit - Includes: drive amp bulk head cable|Y
01|42392|2|2|sets external cable sets fiber optic cable and|Y
01|42392|2|3|cummunication cable.|Y
01|42396|3|1|UPDATED PART# FOR 100TG-PULL|Y
01|42400|1|1|Table includes Motor & Air/Hydraulic booster|Y
01|42400|3|1|V1-1000mninstallation includes drive unit and bulkhead|Y
01|42400|3|2|cables external cables parameter changes time & trav|Y
01|42401|3|1|This table can be either air or hydraulic brake.|Y
01|42401|3|2|Customer must specify which braking system they want.|Y
01|42401|4|1|Optional hydraulic source for hydraulic braking option.|Y
01|42401|4|2|For CNC260 only|Y
01|42401|6|1|Includes: drive amp bulk head cable set external|Y
01|42401|6|2|cable set fiber optic cable communication cable|Y
01|42401|6|3|travel and labor for installation.|Y
01|42422|1|1|Please verify that the shank and square match.|Y
01|42452|1|1|Reference RGA# R-47499|Y
01|42452|1|2|1x PF-2|N
01|42452|5|1|Batteries must be replaced.|Y
01|42475|6|1|Please advise specific size needed.|Y
01|42480|1|1|Reference RGA# R-47484|Y
01|42480|1|2|MZMP47-ER32X-OFF s/n: 38279 02|N
01|42480|3|1|Bearings seals and o-rings are worn and must be|Y
01|42480|3|2|replaced. Labor is included.|Y
01|42489|4|1|Discount reflects non returnable tooling.|Y
01|42489|5|1|Discount reflects non returnable tooling.|Y
01|42489|6|1|Discount reflects non returnable tooling.|Y
01|42519|2|1|These are the holders we spoke about that are|Y
01|42519|2|2|discontinued we can offer extra discount however|Y
01|42519|2|3|these are non-returnable. Uses same wrench as SK16|Y
01|42520|1|1|Reference RGA# T-47491|Y
01|42520|1|2|CNCZ105LYA-BR s/n: 2145|N
01|42522|1|1|Please|N
01|42523|1|1|Reference RGA# T-46858|Y
01|42523|1|2|5AX-130YA-M s/n: 3924|N
01|42523|34|1|GR-AX123R030: Worm Shaft Gear|Y
01|42523|35|1|Repair of 1x USAFED-03CS1S Yaskawa Motor.|Y
01|42523|35|2|Per Yaskawa there is no replacement or upgrade for|Y
01|42523|35|3|this specific motor. Only option available is to repair|Y
01|42524|1|1|High Voltage Fanuc A8iS/4000HV A1000i Motor|Y
01|42524|1|2|Fanuc # A06B-0236-B000 - Currently in Stock from Fanuc|Y
01|42524|2|1|Heidenhain Scale +/- 3|Y
01|42524|2|2|Scale will be Absolute Spec|Y
01|42524|2|3|Complete with Scale/Cable and Mounting Kit|Y
01|42524|2|4|Scale - In Stock from Heidenhain|Y
01|42524|2|5|Scale Mount Kit - ETA 4 weeks from Nikken Japan|Y
01|42524|3|1|Custom 24' Cables per customer's request|Y
01|42524|3|2|Heidenhain Scale and Feedback Encoder as one cable|Y
01|42524|3|3|Power Cable as second cable|Y
01|42524|3|4|Amphenol connectors for table side loose wires|Y
01|42524|3|5|at the end to wire direct to cabinet.|Y
01|42526|1|1|To Be Determined by Factory.|Y
01|42550|2|1|BALANCE PENDING|Y
01|42561|1|1|Reference RGA# R-47411|Y
01|42561|1|2|1x CAT50U-NX5-151|N
01|42582|1|1|Reference RGA# R-47481|Y
01|42609|2|1|Adapter plate A2-11 is included with Power Chuck.|Y
01|42609|3|1|3pcs required per Chuck|Y
01|42609|4|1|JFB-2612 Drawbar Assembly for Okuma V80R|Y
01|42612|2|1|Adapter plate A2-11 is included with Power Chuck. Must|Y
01|42612|2|2|add additional JFB-2614 Adapter Plate for V100R Okuma.|Y
01|42612|3|1|3pcs required per chuck ordered.|Y
01|42612|4|1|JFB-2613 Drawbar Assembly for Okuma V100R|Y
01|42612|5|1|JFB-2614 Adapter Plate for V100R Okuma|Y
01|42623|5|1|Includes: Axis drive bulkhead cable set external|Y
01|42623|5|2|cable set axis expansion card parameter changes|Y
01|42623|5|3|travel and labor for install on Mori DV5100|Y
01|42628|1|1|Collapse range from 7.5mm-7mm|Y
01|42628|2|1|Collapse range from 8mm-7.5mm|Y
01|42639|3|1|200MM Backhand mounted Okuma motor mount without motor|Y
01|42643|1|1|Non-Cancelable & Non-Returnable|Y
01|42645|1|1|Non-Cancelable & Non-Returnable item|Y
01|42647|1|1|Reference RGA# T-47473|Y
01|42647|1|2|5AX-350FA s/n: 3517|N
01|42668|1|1|NBT50-C1.1/4-90 Dual Contact Milling Chuck|Y
01|42668|1|2|Pricing for 1 - 5 pieces|Y
01|42668|2|1|NBT50-C1.1/4-90 Dual Contact Milling Chuck|Y
01|42668|2|2|Pricing for 6 - 11 pieces|Y
01|42668|3|1|NBT50-C1.1/4-90 Dual Contact Milling Chuck|Y
01|42668|3|2|Pricing for 12 - 18 pieces|Y
01|42668|4|1|NBT50-C2-105 Dual Contact Milling Chuck|Y
01|42668|4|2|Pricing for 1 - 5 pieces|Y
01|42668|5|1|NBT50-C2-105 Dual Contact Milling Chuck|Y
01|42668|5|2|Pricing for 6 - 11 pieces|Y
01|42668|6|1|NBT50-C2-105 Dual Contact Milling Chuck|Y
01|42668|6|2|Pricing for 12 - 18 pieces|Y
01|42670|1|1|Reference RGA# R-47481|Y
01|42670|1|2|1x CAT50U-NX5-151|N
01|42670|8|1|Spindle has grooves and must be resurfaced.|Y
01|42670|8|2|Modification will be completed in 2-3 weeks.|Y
01|42671|3|1|Includes: Drive amp bulk head cable set external|Y
01|42671|3|2|cable set fiber optic cable communication cable|Y
01|42671|3|3|travel and labor for installation of table and TAT.|Y
01|42674|2|1|Used for table brake system|Y
01|42674|3|1|Includes: Drive amp bulk head cable set external|Y
01|42674|3|2|cable set fiber optic cable communication cable|Y
01|42674|3|3|travel and labor for installation of rotary table.|Y
01|42674|4|1|Free $2.5K Tooling Certificate good for list price|Y
01|42674|4|2|tool holders.|Y
01|42674|5|1|Free 1 Year Extended Warranty (2 years total)|Y
01|42679|1|1|Reference RGA# R-47387|Y
01|42679|1|2|CAT40U-AFC3/4-205-90 s/n: AZK-10373|N
01|42684|1|1|Tooling Certificate Number: 5410-704-112415RT|Y
01|42688|5|1|Includes: Axis drive bulkhead cable set external|Y
01|42688|5|2|cable set axis expansion card parameter changes|Y
01|42688|5|3|travel and labor for install on Mori DV5100|Y
01|42694|1|1|3 pcs. in stock.|Y
01|42694|1|2|2 pcs. on backorder ETA 2-11-2016|Y
01|42696|1|1|BALANCE OF 1 PC IN 3-5 BUSINESS DAYS|Y
01|42726|2|1|This line at no charge as a courtesy to the customer|Y
01|42726|4|1|This line at no charge as a courtesy to the customer|Y
01|42726|6|1|This line at no charge as a courtesy to the customer|Y
01|42739|2|1|special BT50 Milling Chuck w 6.49 gage length|Y
01|42756|1|1|Tooling Certificate Number: 5410-704-112415RT|Y
01|42759|3|1|Non-Cancelable & Non-Returnable|Y
01|42759|4|1|Non-Cancelable & Non-Returnable|Y
01|42760|1|1|Lead time ETA 1 week upon firm reciept of PO|Y
01|42762|5|1|Includes: Axis drive bulkhead cable set external|Y
01|42762|5|2|cable set axis expansion card parameter changes|Y
01|42762|5|3|travel and labor for install on Samsung|Y
01|42766|3|1|Hand load only on the Haas machine|Y
01|42768|6|1|This line at no charge as a courtesy to the customer|Y
01|42768|7|1|This line at no charge as a courtesy to the customer|Y
01|42771|1|1|Non-Cancelable & Non-Returnable|Y
01|42771|2|1|Non-Cancelable & Non-Returnable|Y
01|42771|3|1|Non-Cancelable & Non-Returnable|Y
01|42771|4|1|Non-Cancelable & Non-Returnable|Y
01|42785|3|1|**Cutter Shank of 5mm~|Y
01|42785|4|1|**Cutter Shank of 10mm~|Y
01|42790|1|1|Non-Cancelable & Non-Returnable|Y
01|42801|1|1|Non-Returnable & Non-Cancelable|Y
01|42832|1|1|Main Spindle - Ext. Coolant - Run Dry: Yes|Y
01|42832|2|1|Main Spindle - Int. Coolant - Run Dry: No|Y
01|42832|4|1|Sub Spindle - Ext. Coolant - Run Dry: Yes|Y
01|42832|5|1|Sub Spindle - Int. Coolant - Run Dry: No|Y
01|42832|7|1|Setting Fixture/Spindle Wrench|Y
01|42832|8|1|Collet Nut Wrench|Y
01|42844|1|1|Reference RGA# R-47406|Y
01|42844|1|2|MNL12-ER32X-OFF s/n: A0013|N
01|42844|3|1|Bearings seals and o-rings must br replaced. Collet|Y
01|42844|3|2|nut must be replaced. Spur gears are damaged and must|Y
01|42844|3|3|be replaced. Labor is included.|Y
01|42883|3|1|Optional - Full Install - Includes Servo Amp internal|Y
01|42883|3|2|and external cables travel within USA 1/2 day labor.|Y
01|42883|4|1|OPTIONAL - PARTIAL INSTALL - Sams as line 3 except|Y
01|42883|4|2|excludes servo amp.|Y
01|42912|3|1|Includes: drive amp bulk head cable set external|Y
01|42912|3|2|cable sets fiber optic cable communication cable|Y
01|42912|3|3|travel and labor for installation.|Y
01|42912|4|1|Free $2.5K Tooling Certificate good for list price|Y
01|42912|4|2|tool holders.|Y
01|42912|5|1|Free 1 Year Extended Warranty (2 Years Total)|Y
01|42923|2|1|H10ARAM-ER32-353ST-110TP|Y
01|42923|2|2|Custom special Angle Head with extended length|Y
01|42930|1|1|Main Spindle - Ext. Coolant - ER32 - Run Dry: Yes|Y
01|42930|2|1|Main Spindle - Int. Coolant - ER32 - Run Dry: No|Y
01|42930|4|1|Sub Spindle - Ext. Coolant - ER32 - Run Dry: Yes|Y
01|42930|5|1|Sub Spindle - Int. Coolant - ER32 - Run Dry: No|Y
01|42930|7|1|Main and Sub Spindle - Ext. Coolant - Run Dry: Yes|Y
01|42930|7|2|DUAL OUTPUT ER32|Y
01|42931|1|1|TABLE INCLUDES SERVO MOTOR CABLES & PARAMETERS|Y
01|42931|1|2|SERVO MOTOR SIGMA 5 UNLESS OTHERWISE NOTED|Y
01|42937|4|1|INSTALLATION INCLUDES SERVO AMP CABLES TRAVEL|Y
01|42937|4|2|FULL 4TH AXIS. EXTERNAL CABLES NO CHARGE|Y
01|42966|1|1|NIKKEN 15.75 ROTARY TABLE WITH FANUC MOTOR|Y
01|42966|4|1|EXTERNAL HYD UNIT FOR TABLE BRAKE SYSTEM INCLUDES HOSES|Y
01|42966|6|1|INSTALLATION INCLUDES AXIS AMP ALL CABLES|Y
01|42966|6|2|TRAVEL LABOR CONNECTORS PARAMETERS|Y
01|42966|6|3|MACHINE MORI NVX7000 WITH FANUC OimD control|Y
01|42967|1|1|Reference RGA# T-47531|Y
01|42967|1|2|CNC300FA-M s/n: 1504|N
01|42968|1|1|Net price reflects 1 or 2 piece price.|Y
01|42968|3|1|Net price reflects 3+ piece price.|Y
01|42982|1|1|Reference RGA# R-47324|Y
01|42982|1|2|F90-C1.1/4AW-82|N
01|42995|4|1|130MM face plate for fixture mounting|Y
01|43015|1|1|Net Price Each|Y
01|43015|1|2|Non-Cancelable & Non-Returnable|Y
01|43015|3|1|Net Price Each|Y
01|43015|4|1|Net Price Each|Y
01|43019|1|1|BALANCE ETA 1-2 WEEKS|Y
01|43019|2|1|This line at no charge as a courtesy to the customer|Y
01|43023|11|1|This line is listed at your NET cost|Y
01|43023|12|1|This line is listed at your NET cost|Y
01|43027|2|1|Non-Cancelable & Non-Returnable|Y
01|43034|25|1|for Okuma MA600HBII|Y
01|43035|1|1|Reference RGA# T-47520|Y
01|43035|1|2|CNC401FA s/n: 5939|N
01|43054|1|1|Basic Rebuild (Bearings/Seals/O-Rings)|Y
01|43054|1|2|Labor is included|Y
01|43054|2|1|Parts to rebuild the brake system (If necessary)|Y
01|43054|3|1|Hard parts to be replaced (If necessary)|Y
01|43054|4|1|Expedite fee to have table evaluated in 1-2 days|Y
01|43054|4|2|Repair in 2-3 days once all parts needed are in stock.|Y
01|43072|1|1|Budgetary Quote for PM Service Call|Y
01|43072|1|2|Following tables will be checked:|Y
01|43072|1|3|5AX-2MT-105-120FA S/N 8173 (PM + Possible Brake Issues)|Y
01|43072|1|4|5AX-2MT-105-120FA S/N 8235 (PM)|Y
01|43072|1|5|5AX-200IIFA S/N 1604 (PM)|Y
01|43072|1|6|5AX-200IIFA S/N 1363 (PM)|Y
01|43072|2|1|Transit Time: Estimate 15hrs x $100.00/hr = $1500.00|Y
01|43072|2|2|Airfare & Car Rental: Estimate of $1000.00|Y
01|43072|2|3|Hotel/Travel/Food Expense: Estimate of $500.00|Y
01|43072|3|1|Estimated 10 hours for 2 day service call|Y
01|43072|3|2|Minimum of 4 hour labor charge.|Y
01|43075|2|1|1-year extended warranty.|Y
01|43083|2|1|CNC-260OSP3-M (TABLE & MOTOR ONLY) SPECIAL PRICING|Y
01|43083|4|1|TAT-105 TAILSTOCK SUPPORT WITH BRAK WILL NEED RISER|Y
01|43083|4|2|CNC260 CENTER HEIGHT 170MM  TAT-105 105MM|Y
01|43094|14|1|With SKN-16BJ Coolant Nut Installed|Y
01|43094|15|1|Installed on CAT40-SK16-120U|Y
01|43101|1|1|ETA 1 week upon firm reciept of PO|N
01|43101|1|2|This item is not a stock piece and considered a Special|Y
01|43101|1|3|For this reason it cannot be canceled once an order|Y
01|43101|1|4|has been placed with factory.|Y
01|43104|2|1|Includes: Dual axis drive unit bulk head cables|Y
01|43104|2|2|fiber optic cables communications cables external|Y
01|43104|2|3|cables parameter changes service time and travel.|Y
01|43105|1|1|This NIKKEN 5AX-201FA-M IS DUPLICATE OF S/N 5148|Y
01|43105|1|2|3 PCS NEEDED 1 PC 5AX-201FA-M TO TO BE EXCHANGED FOR|Y
01|43105|1|3|5AX-350FA-M UNUSED IN CRATE AT JTEKT|Y
01|43105|1|4|2pcs 5AX-201 TO BE PURCHASED ADDITIONAL DISCOUNT NOTED|Y
01|43105|1|5|WILL NEED TO PURCHASE 2 COMPLETE CABLE SETS AND|Y
01|43105|1|6|2 PCS OF 3+1 ROTARY UNION|Y
01|43105|1|7|THIS QUOTE REFLECTS ADDITIONAL ROTARY TABLE AS A SPARE|Y
01|43115|1|1|Okuma LBEX Series Special 90 Deg Live Tool|Y
01|43115|1|2|BMT60 ER25 output External Coolant|Y
01|43115|1|3|1:2 Gear Ratio 6500 Max input -> 13000 Max Output|Y
01|43115|1|4|Max Torque 25Nm|Y
01|43115|2|1|Okuma LBEX Series Special Straight - Offset Tool|Y
01|43115|2|2|BMT60 ER16 output External Coolant|Y
01|43115|2|3|1:3 Gear Ratio 6000 Max input -> 18000 Max Output|Y
01|43115|2|4|Max 5Nm Torque|Y
01|43132|1|1|Reference RGA# T-47495|Y
01|43132|1|2|CNC100-4W-120FA s/n: 8013 Repair|Y
01|43132|21|1|Some wear optional to replace.|Y
01|43132|22|1|Some wear optional to replace.|Y
01|43132|23|1|Some wear optional to replace.|Y
01|43132|25|1|AO Conversion PO# 24933|Y
01|43140|1|1|Balance ETA 13-14WK|Y
01|43140|1|2|Note: Net pricing only|Y
01|43141|25|1|for Okuma MA600HBII|Y
01|43147|1|1|This line is listed at your NET cost.|Y
01|43148|1|1|HSK100A-EM1250-6.00 w/RFID Chip Hole Bore & Seco logo|Y
01|43148|1|2|These are considered Special and once an order is|Y
01|43148|1|3|placed with factory it may not be canceled or returned|Y
01|43155|1|1|Replacement for unit sold on INV#2009420 SO#583322 to|Y
01|43155|1|2|Mazak on 10/18/2013. Flat Pin style.|Y
01|43156|1|1|Set includes the following: 2-CNCZ180LYA-BR tables with|Y
01|43156|1|2|sheet metal divider junction box with main cable set|Y
01|43156|1|3|B-master cables and load zone index button|Y
01|43156|5|1|Set includes the same as above except CNCZ-202 tables|Y
01|43188|1|1|Reference RGA# T-47562|Y
01|43188|1|2|CNCZ202LSA3 s/n: 1019|N
01|43190|3|1|1-4 PC PRICE|Y
01|43190|4|1|5-9 PC PRICE|Y
01|43190|5|1|10+ PC PRICE|Y
01|43194|1|1|Service Call to be performed on 1/15/16 by Scott|N
01|43194|1|2|Lechtanski.|N
01|43194|3|1|Transit Time(Round Trip): 2hrs x 100/hr = $200.00|Y
01|43194|3|2|Gas/Mileage(Round Trip): 72.8mi x $0.565/mi = $41.13|Y
01|43194|3|3|Meal: $25.00|Y
01|43194|4|1|Minimum Service Charge is 4 hours labor.|Y
01|43194|4|2|Additional labor over 4 hours will be charged per hour.|Y
01|43197|3|1|This pricing is NET pricing. No discounts are to be|Y
01|43197|3|2|Given on this line item!|Y
01|43223|4|1|this line at no charge as a courtesy|Y
01|43230|6|1|Custom Positioning Block for Leadwell|Y
01|43230|6|2|This is a modified item and non-returnable.|Y
01|43239|4|1|Expedite Fee for guaranteed evaluation with in 2|Y
01|43239|4|2|business days and repair within 5 business days of|Y
01|43239|4|3|approval of quotation and credit card information.|Y
01|43249|1|1|CA13: Alpha21 Motor power/Signal cable|Y
01|43249|1|2|For cable to be made we require old one to be sent in|Y
01|43249|1|3|for reference.|Y
01|43254|2|1|Air/Hyd booster for the brake system.|Y
01|43267|1|1|70pcs available 3-4 days balance aprox 3 weeks|Y
01|43271|3|1|Only (6p) Available|Y
01|43271|3|2|Non-Cancelable & Non-Returnable|Y
01|43273|3|1|Power and Feedback cable sets|Y
01|43273|4|1|Free $1000.00 tooling promotion.|Y
01|43273|5|1|3000 PSI Hydraulic Rotary Union 4+1|Y
01|43280|17|1|ETA approx. 2-3 weeks|Y
01|43303|2|1|ETA 1 week upon firm reciept of PO|Y
01|43303|3|1|ETA 1 week upon firm reciept of PO|Y
01|43303|7|1|HSK63A-FMC27-60|Y
01|43316|3|1|NBT40-SZF10C-120|Y
01|43316|6|1|NBT40-SZF10C-150|Y
01|43334|2|1|This item is considered a special and is non|Y
01|43334|2|2|returnable!|Y
01|43341|1|1|BT40-SK25-90-J  Price includes nut converted to coolant|Y
01|43341|2|1|BT40-SK25-120-J Price includes nut converted to coolant|Y
01|43341|3|1|Price difference has been included in SK Chuck prices|Y
01|43341|5|1|This item is not a standard shelf piece and considered|Y
01|43341|5|2|a Special. Once order has been placed with factory it|Y
01|43341|5|3|may not be cancelled or returned.|Y
01|43342|1|1|This provides everything needed except the 5C Collets.|Y
01|43343|1|1|Special discount applied for 10 piece order.|Y
01|43355|1|1|Reference RGA# 47406.|Y
01|43355|1|2|Discount reflects core trade in.|Y
01|43360|1|1|Net Price Each|Y
01|43360|1|2|Non-Cancelable & Non-Returnable|Y
01|43360|2|1|Net Price Each|Y
01|43360|2|2|Non-Cancelable & Non-Returnable|Y
01|43360|3|1|Net Price Each|Y
01|43360|3|2|Non-Cancelable & Non-Returnable|Y
01|43380|1|1|Reference RGA# R-47509|Y
01|43380|1|2|OKL3-ER32X s/n: AL754|N
01|43380|3|1|Gears collet nut clutch bearings seals and o-rings|Y
01|43380|3|2|must all be replaced.  Labor charge is included.|Y
01|43386|1|1|Reference RGA# R-47539|Y
01|43386|1|2|OKEX-ER32Z s/n: AL060|N
01|43386|3|1|Collet nut bearings seals and o-rings must be|Y
01|43386|3|2|replaced.  Labor included.|Y
01|43386|3|3|2 week delivery|Y
01|43389|1|1|Reference RGA# R-47305|Y
01|43389|1|2|NC50RAM-MI63-243OT s/n: 52492 01|Y
01|43389|5|1|MI63 quick change is damaged beyond repair this must|Y
01|43389|5|2|be replaced as a complete assembly.|Y
01|43389|5|3|Bearings seals and o-rings must be replaced.|Y
01|43389|5|4|Labor is included.|Y
01|43403|1|1|Includes: Table Alpha 21 Independent Control Pendant|Y
01|43403|3|1|Includes: Travel and labor for installation help on|Y
01|43403|3|2|alpha 21 control.|Y
01|43412|1|1|Reference RGA# R-47367|Y
01|43412|1|2|OKL3-ER32X s/n: AL0124|N
01|43412|3|1|Collet nut and gears need to be replaced. Bearings|Y
01|43412|3|2|seals and o-rings must also be replaced. Labor is|Y
01|43412|3|3|included.|Y
01|43413|1|1|Reference RGA# R-46552|Y
01|43413|3|1|Drive shaft collet nut locating boss bearings seals|Y
01|43413|3|2|and o-rings need to be replaced.|Y
01|43413|3|3|Labor charge is included.|Y
01|43418|1|1|Additional discount quoted by Steve Lenihan as a|Y
01|43418|1|2|one-time courtesy.  Customer's holders sent in on|Y
01|43418|1|3|RGA# R-47152 are un-repairable.|Y
01|43419|1|1|Two CNC180 Left hand rotary tables with needed sheet|Y
01|43419|1|2|metal for center divider.|Y
01|43419|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|43419|3|2|holders.|Y
01|43420|4|1|ER32 Offset Straight Internal - SPECIAL|Y
01|43421|1|1|Complete Assy - Drawing TCZ-E6004|Y
01|43421|4|1|Part # 86C|Y
01|43421|5|1|Part # 86B|Y
01|43421|6|1|Part # 85A|Y
01|43421|7|1|Part # 81B|Y
01|43421|8|1|Part # 84A|Y
01|43421|9|1|Part # 81A|Y
01|43435|1|1|Reference RGA# R-47558|Y
01|43435|1|2|DT10611503011 s/n: NA|N
01|43435|3|1|Bearings seals and o-rings must be replaced. Spindles|Y
01|43435|3|2|must be resurfaced as needed. Labor is included.|Y
01|43437|1|1|This NIKKEN 5AX-201FA-M IS DUPLICATE OF S/N 5148|Y
01|43437|1|2|3 PCS NEEDED 1 PC 5AX-201FA-M TO TO BE EXCHANGED FOR|N
01|43437|1|3|5AX-350FA-M UNUSED IN CRATE AT JTEKT|N
01|43437|1|4|2pcs 5AX-201 TO BE PURCHASED ADDITIONAL DISCOUNT NOTED|N
01|43437|1|5|nILL NEED TO PURCHASE 2 COMPLETE CABLE SETS AND|N
01|43437|1|6|n PCS OF 3+1 ROTARY UNION|N
01|43437|1|7|THIS QUOTE REFLECTS ADDITIONAL ROTARY TABLE AS A SPARE|N
01|43438|1|1|Pricing is based upon the purchase of a matching taper|Y
01|43438|1|2|toolholder.|Y
01|43455|1|1|Reference RGA# R-47515|Y
01|43455|1|2|H63A-MRAM-ER11ST s/n: 43308 01|N
01|43455|3|1|Bearings seals and o-rings must be replaced.|Y
01|43455|3|2|Bevel gear set is damaged and must be replaced.|Y
01|43455|3|3|Labor is included.|Y
01|43491|1|1|Reference RGA# T-47483|Y
01|43491|1|2|CNCZ202 s/n: 12078T|N
01|43495|1|1|4 pcs stock/ 1 ETA 7 weeks Japan|Y
01|43495|2|1|6 pcs stock/ 5 ETA 7 weeks Japan|Y
01|43495|3|1|6 pcs stock/ 5 ETA 7 weeks Japan|Y
01|43495|4|1|11pcs. ETA 7 weeks Japan|Y
01|43495|5|1|5 pcs ETA 7 weeks Japan|Y
01|43495|6|1|6 pcs stock/ 5 ETA 7 weeks Japan|Y
01|43495|7|1|6 pcs stock/ 5 ETA 7 weeks Japan|Y
01|43495|8|1|11pcs. ETA 7 weeks Japan|Y
01|43495|9|1|ETA 7 weeks Japan|Y
01|43495|10|1|6 pcs stock/ 5 ETA 7 weeks Japan|Y
01|43495|11|1|ETA 7 weeks Japan|Y
01|43495|12|1|11pcs. ETA 7 weeks Japan|Y
01|43500|1|1|200MM 4th and 5th axis table with Mitsubishi motors|Y
01|43500|3|1|CONFERMATION OF CABLES NEEDED PRIOR TO ORDER|Y
01|43501|1|1|Hydraulic Brakes|Y
01|43501|2|1|500 PSI unit and hoses for table braking systems.|Y
01|43501|3|1|Includes: drive amps bulk head cable sets external|Y
01|43501|3|2|cable sets fiber optic cable communication cables|Y
01|43501|3|3|travel and labor.|Y
01|43501|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|43501|4|2|holders.|Y
01|43502|1|1|Hydraulic Brakes|Y
01|43502|2|1|500 PSI unit and hoses for table braking systems.|Y
01|43502|3|1|Includes: drive amps bulk head cable sets external|Y
01|43502|3|2|cable sets fiber optic cable communication cables|Y
01|43502|3|3|travel and labor.|Y
01|43502|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|43502|4|2|holders.|Y
01|43503|1|1|8 Table Option|Y
01|43503|6|1|10 Table Option|Y
01|43503|10|1|***OPTIONAL***|Y
01|43503|10|2|Air over hydraulic booster for CNC260 table only.|Y
01|43503|13|1|Free $1K Tooling Certificate good for list price tool|Y
01|43503|13|2|holders.|Y
01|43508|1|1|Discount quoted reflects one-time offer to replace|Y
01|43508|1|2|crashed holder instead of sending in for repair.|Y
01|43508|1|3|Should your customer choose to send in the crashed|Y
01|43508|1|4|tool for repair this quotation will no longer be valid.|Y
01|43508|1|5|ETA from Nikken Japan is early February.|Y
01|43521|1|1|Includes: Table Alpha 21 Independent Control Pendant|Y
01|43521|3|1|Includes: Travel and labor for installation help on|Y
01|43521|3|2|alpha 21 control.|Y
01|43528|2|1|2pc ETA pending from factory.|Y
01|43528|3|1|6pcs. ETA pending from factory|Y
01|43528|5|1|1pc. ETA pending from factory|Y
01|43528|6|1|10 pcs. ETA pending from factory|Y
01|43530|4|1|Replaces RGA# 47600 from INV# 2088051 SO# 685374|Y
01|43530|4|2|Please ship back 2pcs BT40-C3/4-70 to:|Y
01|43530|4|3|Lyndex-Nikken|Y
01|43530|4|4|1468 Armour Blvd.|Y
01|43530|4|5|Mundelein IL 60060|Y
01|43530|4|6|Attn: RGA# 47600|Y
01|43540|26|1|ETA 2/20/2016|Y
01|43554|2|1|Installation Kit: Includes drive amp and all needed|Y
01|43554|2|2|cables.|Y
01|43557|4|1|Includes: drive amp bulk head cable set external|Y
01|43557|4|2|cable set fiber optic cable communication cable|Y
01|43557|4|3|travel and labor for installation of one table to one|Y
01|43557|4|4|machine.|Y
01|43557|6|1|Includes: drive amp bulk head cable set external|Y
01|43557|6|2|cable set fiber optic cable communication cable|Y
01|43557|6|3|travel and labor for installation for two tables on|Y
01|43557|6|4|one machine.|Y
01|43573|1|1|This item is not a standard stock item for us and is|Y
01|43573|1|2|considered a Special. Once the order has been placed|Y
01|43573|1|3|with factory it cannot be canceled.|Y
01|43578|1|1|Discount based upon 1 to 25 pieces.|Y
01|43580|1|1|Non-Cancelable & Non-Returnable|Y
01|43580|2|1|Non-Cancelable & Non-Returnable|Y
01|43589|1|1|BALANCE IN 1-2 WEEKS|Y
01|43590|2|1|A2-8 In-Direct Mount Adapter Plate for HW-12BB-KS|Y
01|43590|3|1|M90x2 Threading to match draw tube on HW-12BB-KS|Y
01|43590|5|1|M52x1.5 Threading to match draw tube on HW-06-KS|Y
01|43594|1|1|EXT. Coolant - Run Dry: Yes - STD Bearing Nut|Y
01|43594|2|1|INT. Coolant - Run Dry: Yes - Flush Nut|Y
01|43595|1|1|Hydraulic Brakes|Y
01|43595|3|1|Includes: drive amps bulk head cable sets external|Y
01|43595|3|2|cable sets fiber optic cable communication cables|Y
01|43595|3|3|travel and labor.|Y
01|43595|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|43595|4|2|holders.|Y
01|43604|1|1|Balance in 2-3 weeks|Y
01|43604|2|1|Balance in 2-3 weeks|Y
01|43609|1|1|H63A(80)-SF0250-3.00-IDI|Y
01|43609|1|2|HSK63(80) Shrink Fit 1/4 3.00G.L.|Y
01|43609|2|1|H63A(80)-SF0437-3.00-IDI|Y
01|43609|2|2|HSK63(80) Shrink Fit 7/16 3.00G.L.|Y
01|43609|3|1|H63A(80)-SF0500-3.00-IDI|Y
01|43609|3|2|HSK63A(80) Shrink Fit 1/2 3.00G.L.|Y
01|43609|4|1|H63A(80)-SF0625-2.55-IDI|Y
01|43609|4|2|HSK63A(80) Shrink Fit 5/8 2.55G.L.|Y
01|43609|5|1|H63A(80)-SF0625-3.00-IDI|Y
01|43609|5|2|HSK63A(80) Shrink Fit 5/8 3.00G.L.|Y
01|43609|6|1|H63A(80)-SF0750-2.95-IDI|Y
01|43609|6|2|HSK63A(80) Shrink Fit 3/4 2.95G.L.|Y
01|43609|7|1|H63A(80)-SF1000-3.125-IDI|Y
01|43609|7|2|HSK63A(80) Shrink Fit 1 3.125G.L.|Y
01|43609|8|1|H63A(80)-SF1000-4.00-IDI|Y
01|43609|8|2|HSK63A(80) Shrink Fit 1 4.00G.L.|Y
01|43609|9|1|H63A(80)-SF12-3.00-IDI|Y
01|43609|9|2|HSK63A(80) Shrink Fit 12mm 3.00G.L.|Y
01|43609|10|1|HSK63A(80)-ER16-100-IDI|Y
01|43609|10|2|HSK63A(80) ER16 Collet Chuck 100mm G.L.|Y
01|43609|11|1|HSK63A(80)-ER16-6.00-IDI|Y
01|43609|11|2|HSK63A(80) ER16 Collet Chuck 6.00G.L.|Y
01|43609|12|1|HSK63A(80)-ER20-100-IDI|Y
01|43609|12|2|HSK63A(80) ER20 Collet Chuck 100mm G.L.|Y
01|43609|13|1|HSK63A(80)-ER32-100-IDI|Y
01|43609|13|2|HSK63A(80) ER32 Collet Chuck 100mm G.L.|Y
01|43609|14|1|HSK63A(80)-ER40-100-IDI|Y
01|43609|14|2|HSK63A(80) ER40 Collet Chuck 100mm G.L.|Y
01|43609|15|1|Mounting ID Chip/Fine Balance RFID Chip hole to 30K RPM|Y
01|43609|21|1|HSK63(80)-SF16-100-IDI|Y
01|43609|21|2|HSK63A/80 16mm Shrink Fit Holder w/100mm gage length|Y
01|43609|21|3|CHIP ID installed|Y
01|43613|1|1|Non-Cancelable & Non-Returnable|Y
01|43623|1|1|Possible retention studs if needed! RKP 5$ a piece|Y
01|43628|1|1|Reference RGA# T-47552|Y
01|43628|1|2|5AX-130FA s/n: 3117|N
01|43633|1|1|Discount is based upon a one time credit card order.|Y
01|43635|1|1|Non-Cancelable & Non-Returnable|Y
01|43648|4|1|Need to confirm cable length|Y
01|43648|4|2|4 complete sets 3-4 weeks ARO|Y
01|43651|1|1|Tooling Certificate Number: 23345-726-011416|Y
01|43656|1|1|Includes: Table Alpha 21 Independent Control Pendant|Y
01|43656|3|1|Includes: Travel and labor for installation help on|Y
01|43656|3|2|alpha 21 control.|Y
01|43656|5|1|**OPTIONAL** Tail Stock option for CNC180|Y
01|43656|6|1|**OPTIONAL** 8 Scroll Chuck option for CNC180|Y
01|43668|7|1|HMS-8.695 Reamer needs print approval.|Y
01|43676|2|1|This line is listed at your NET cost|Y
01|43683|1|1|Fixed - One piece style|Y
01|43683|2|1|Modular - Taper Portion|Y
01|43683|3|1|Modular - ER20 Slim Type Attachment|Y
01|43683|4|1|Modular - NSK adapter|Y
01|43683|5|1|Modular - NSK Attachment|Y
01|43683|7|1|Modular - Positioning Pin - 110mm pitch|Y
01|43683|8|1|Modular - Positioning Pin- 65mm pitch|Y
01|43683|9|1|Modular - Positioning Pin - 80mm pitch|Y
01|43704|1|1|Replacement Soft Jaws for Howa HO27M10P|Y
01|43704|1|2|1 Set of 3 pieces|Y
01|43719|2|1|5C manual collet closer with adapter for DD250LS|Y
01|43736|2|1|Please note what extra 4 collets they are looking for|Y
01|43736|2|2|to make a 15pc set. We make an 11pc set and the extra|Y
01|43736|2|3|4pcs would be added as individual pieces.|Y
01|43742|1|1|5AX250SABR2 with hydraulic brake and installation kit|Y
01|43742|1|2|for the Brother S1000|Y
01|43744|1|1|BALANCE IN 1-2 WEEKS|Y
01|43754|1|1|Reference RGA# R-47568|Y
01|43754|1|2|T32213/MNL12-ER40X s/n: A0091|N
01|43754|3|1|Collet nut bearings seals and o-rings must be|Y
01|43754|3|2|replaced. Labor is included.|Y
01|43778|1|1|Crossover to Velocity 14.801.0.0046.0|Y
01|43778|2|1|Crossover to Velocity 14.101.0.0074.0|Y
01|43778|3|1|Crossover to Velocity 14.910.0.0209.0|Y
01|43809|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|43809|2|2|holders.|Y
01|43812|1|1|Reference RGA# R-47585|Y
01|43812|1|2|1x CAT40-UMT200U|N
01|43812|6|1|Battery must be replaced.|Y
01|43821|1|1|Howa 32 Air Chuck H012M32 R-218|Y
01|43821|1|2|Net price quoted includes delivery of:100 days to build|Y
01|43821|1|3|and 1 week shipping.|Y
01|43821|3|1|Howa 32 Air Chuck H012M32 R-218|Y
01|43821|3|2|Net price quoted includes delivery of:100 days to build|Y
01|43821|3|3|and 7 to 8 weeks shipping.|Y
01|43821|12|1|3-pcs=1 Set Soft Jaws for H012M32 R-218|Y
01|43821|13|1|3-pcs=1 Set Hard Jaws for H012M32 R-218|Y
01|43826|2|1|Power Female with 90 Deg Coupling|Y
01|43826|3|1|Power Male Connector|Y
01|43829|3|1|This line is listed at your NET cost|Y
01|43836|1|1|Reference RGA# T-47574|Y
01|43836|1|2|CNC401 s/n: 6267|N
01|43841|1|1|Reference RGA# T-47543|Y
01|43841|1|2|NSVZ300A21 s/n: 2180H|N
01|43844|1|1|Non-Cancelable & Non-Returnable|Y
01|43848|26|1|ETA 2/20/2016|Y
01|43869|2|1|Wrench for C5007-1000-3.50|Y
01|43869|21|1|*offered 90mm projection length|Y
01|43890|1|1|Reference RGA# T-47601|Y
01|43890|1|2|CNCZ100-4W-120 s/n: 9031|N
01|43890|23|1|PRICING ON THIS ITEM IS PENDING|Y
01|43890|24|1|PRICING ON THIS ITEM IS PENDING|Y
01|43890|25|1|Optional Motor Cover Replacement|Y
01|43890|27|1|Expedited charges for parts to ship UPS arriving week|Y
01|43890|27|2|of 2/1.|Y
01|43910|4|1|Includes: Axis drive bulkhead cable set external|Y
01|43910|4|2|cable set axis expansion card parameter changes|Y
01|43910|4|3|travel and labor for install on Mori DV5100|Y
01|43947|1|1|Non-Cancelable & Non-Returnable|Y
01|43947|2|1|Non-Cancelable & Non-Returnable|Y
01|43974|1|1|Item quoted at a net price.|Y
01|43981|1|1|Replacements for exchange of 10mm|Y
01|43981|3|1|Replacements for exchange of ER16 units|Y
01|43982|3|1|3 pcs. ETA pending per factory|Y
01|43983|1|1|Item quoted at a net price.|Y
01|43984|1|1|Item quoted at a net price.|Y
01|43991|2|1|Air freight cost from Howa Japan|Y
01|43994|1|1|Item quoted at a net price.|Y
01|44005|1|1|Special Discount for Boeing Salt Lake City UT.|Y
01|44010|1|1|Reference RGA# T-47595|Y
01|44010|1|2|NSVZ180 s/n: 3052|N
01|44010|42|1|Freight Charges to send unit to Japan for repair.|Y
01|44012|1|1|Part# 500-070 size 1.3/32 is back order|Y
01|44012|1|2|BO Delivery End of March|Y
01|44012|1|3|Lyndex-Nikken can ship partial|Y
01|44017|1|1|Non-Cancelable & Non-Returnable|Y
01|44063|1|1|Discount is based upon a purchase order of 25 pcs|Y
01|44063|1|2|or more.|Y
01|44079|9|1|**Package Pricing w/ 10pc CAT40-SF0250-3.15|Y
01|44079|9|2|**Machine available in 200-240V or 380-480V|Y
01|44079|9|3|Machine includes 2x holder pots|Y
01|44079|9|4|Machine must ship via freight carrier|Y
01|44095|7|1|*use with 16mm ST OD/ 6mm ID extension|Y
01|44095|9|1|*use with 20mm ST OD/ 6mm and 8mm ID extension|Y
01|44095|17|1|*use with 20mm HSK100A SF holder|Y
01|44097|1|1|Price includes SKN-16BJ installed on holder.|Y
01|44097|1|2|Quoted as net price.|Y
01|44103|4|1|SK25-25.4 A    SK25 25.4 On Size Collet  Special|Y
01|44112|4|1|*use with 20mm OD 6mm ID extension|Y
01|44112|11|1|*use with 20mm CAT50 SF holder|Y
01|44120|1|1|Reference RGA# T-47634|Y
01|44120|1|2|CNC501T s/n: 6541|N
01|44120|8|1|Wooden crate for safe shipment of CNC501T.|Y
01|44123|2|1|**Optional**  Booster increases brake torque to 1568Nm|Y
01|44123|2|2|Air brake produces 588Nm of brake torque.|Y
01|44123|3|1|Includes: drive amp bulk head cable set external|Y
01|44123|3|2|cable set communication cables parameter changes|Y
01|44123|3|3|travel and labor for installation on Hardinge V1000.|Y
01|44123|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|44123|4|2|holders.|Y
01|44133|3|1|Option for the 115mm gauge length|Y
01|44155|1|1|Reference RGA# R-47612|Y
01|44155|1|2|1x C4005-0562-4.47|Y
01|44166|1|1|Shrink fit unit + 10 CAT40 SF holders + 2 CAT40 SF pots|Y
01|44166|6|1|Included in shrink fit unit package deal|Y
01|44177|1|1|10 days to place order or need to reconfirm delivery|Y
01|44177|2|1|10 days to place order or need to reconfirm delivery.|Y
01|44201|1|1|Discount is a one-time courtesy to have customer not|Y
01|44201|1|2|send in their damaged tool.|Y
01|44201|1|3|Should customer decide to send in the damaged tool|Y
01|44201|1|4|for repair this discount will not be honored.|Y
01|44214|1|1|TOOL# 1|Y
01|44214|2|1|TOOL# 2-4|Y
01|44214|4|1|TOOL# 2|Y
01|44214|5|1|TOOL# 3|Y
01|44214|6|1|TOOL# 3|Y
01|44214|7|1|TOOL# 4|Y
01|44223|1|1|Power Supply Cable - 60FT Total|Y
01|44223|1|2|Lyndex-Nikken Installer Delivered 1/28/2016|Y
01|44223|2|1|Signal Cable - 60FT Total|Y
01|44223|2|2|Lyndex-Nikken Installer Delivered 1/28/2016|Y
01|44223|3|1|Feedback Cable - 60FT Total|Y
01|44223|3|2|Lyndex-Nikken Installer Delivered 1/28/2016|Y
01|44223|4|1|Connector/Cable Loom set requested per the customer|Y
01|44223|4|2|4 x Feedback Connector covers|Y
01|44223|4|3|4 x Power/Signal Connector covers|Y
01|44223|4|4|4 x 3FT Feedback Loom|Y
01|44223|4|5|4 x 3FT Feedback Loom|Y
01|44223|4|6|Shipping out UPS Today.|Y
01|44230|1|1|Tooling Certificate Number: 13485-728-012616|Y
01|44237|5|1|**Emergency Collet for 5.5mm size.|Y
01|44237|5|2|Customer must modify collet|Y
01|44240|1|1|Reference RGA# R-47597|Y
01|44240|1|2|1x C5005-0875-5.66|N
01|44241|1|1|Will contain Okuma Motors OSP3|Y
01|44242|2|1|500 PSI unit and hoses for table braking systems.|Y
01|44242|3|1|Free $1K value Tooling Certificate good for list price|Y
01|44242|3|2|tool holders.|Y
01|44243|2|1|500 PSI unit and hoses for table braking systems.|Y
01|44243|3|1|Free $1K value Tooling Certificate good for list price|Y
01|44243|3|2|tool holders.|Y
01|44244|2|1|500 PSI unit and hoses for table braking systems.|Y
01|44244|3|1|Free $1K value Tooling Certificate good for list price|Y
01|44244|3|2|tool holders.|Y
01|44248|2|1|Item is quoted at a net price|Y
01|44259|2|1|NT50 Taper Center Socket|Y
01|44259|3|1|5 Riser Plate for CNC321L-ZA|Y
01|44259|4|1|NT50 Taper Center Socket|Y
01|44259|5|1|Hydrauliuc Cylinder and Adapter Plate|Y
01|44259|6|1|RCN-8380 +/- 2 Scale and Adapater Kit|Y
01|44259|7|1|Power and Signal/ Feedback Cable set|Y
01|44266|1|1|Reference RGA# R-47633|Y
01|44266|1|2|2x BT30-NPU8-70|N
01|44266|3|1|2.5mm Lead screw bearings must be replaced.|Y
01|44266|4|1|Labor is $110.00/hour. Price reflects 1.5 hours of|Y
01|44266|4|2|labor.|Y
01|44274|9|1|**Package Pricing w/ 10pc CAT40-SF0250-3.15|Y
01|44274|9|2|**Machine available in 200-240V or 380-480V|Y
01|44274|9|3|Machine includes 2x holder pots|Y
01|44274|9|4|Machine must ship via freight carrier|Y
01|44276|3|1|B5017-0025B(Stock 9pc) offered as an alternative.|Y
01|44276|3|2|for B5017-0025-4.00|Y
01|44282|3|1|B5017-0025B(Stock 9pc) offered as an alternative.|Y
01|44282|3|2|for B5017-0025-4.00|Y
01|44283|18|1|Position block made by Lyndex-Nikken upon receipt of|Y
01|44283|18|2|spindle drawing information|Y
01|44283|18|3|*position block required for each machine|Y
01|44307|1|1|Non-Cancelable & Non-Returnable|Y
01|44307|2|1|Non-Cancelable & Non-Returnable|Y
01|44309|8|1|Position block made by Lyndex-Nikken upon receipt of|Y
01|44309|8|2|spindle drawing information|Y
01|44309|12|1|Position block made by Lyndex-Nikken upon receipt of|Y
01|44309|12|2|spindle drawing information|Y
01|44314|1|1|Non-Cancelable & Non-Returnable|Y
01|44314|2|1|Non-Cancelable & Non-Returnable|Y
01|44314|3|1|Non-Cancelable & Non-Returnable|Y
01|44314|5|1|Non-Cancelable & Non-Returnable|Y
01|44318|5|1|Non-standard stock item|Y
01|44332|2|1|Special Adapter Plate for Haas HRT210-Spindle Drawing|Y
01|44332|2|2|needed in order to make.|Y
01|44414|2|1|Position block made by Lyndex-Nikken upon receipt of|Y
01|44414|2|2|spindle drawing information|Y
01|44430|18|1|Position block made by Lyndex-Nikken upon receipt of|Y
01|44430|18|2|spindle drawing information|Y
01|44430|18|3|*position block required for each machine|Y
01|44441|18|1|Position block made by Lyndex-Nikken upon receipt of|Y
01|44441|18|2|spindle drawing information|Y
01|44441|18|3|*position block required for each machine|Y
01|44468|1|1|Power Supply Cable - 60FT Total|Y
01|44468|1|2|Lyndex-Nikken Installer Delivered 1/28/2016|Y
01|44468|2|1|Signal Cable - 60FT Total|Y
01|44468|2|2|Lyndex-Nikken Installer Delivered 1/28/2016|Y
01|44468|3|1|Feedback Cable - 60FT Total|Y
01|44468|3|2|Lyndex-Nikken Installer Delivered 1/28/2016|Y
01|44478|5|1|Free $1K Tooling Certificate with each table good for|Y
01|44478|5|2|list price tool holders.|Y
01|44494|1|1|Non cancelable & Non-Returnable|Y
01|44518|2|1|This item is non-standard stock once a purchase|Y
01|44518|2|2|order has been issued this item will be|Y
01|44518|2|3|non-returnale and non-cancellable.|Y
01|44529|1|1|***AIR BRAKE***|Y
01|44529|1|2|Set up with HAAS Motor and Cable|Y
01|44566|1|1|Left Hand Table WITH Mits Motor|Y
01|44566|3|1|TCE-95951-1800R with Special MA connector.|Y
01|44566|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|44566|4|2|holders.|Y
01|44566|5|1|Hubbell Cable Retractor - BD-05|Y
01|44566|5|2|6' for 3-5lbs|Y
01|44574|1|1|Reference RGA# T-47592|Y
01|44574|1|2|5AX-201 s/n: 3617|N
01|44582|2|1|Signal Cable - 60FT Total|Y
01|44582|2|2|Lyndex-Nikken Installer Delivered 1/28/2016|Y
01|44582|3|1|Feedback Cable - 60FT Total|Y
01|44582|3|2|Lyndex-Nikken Installer Delivered 1/28/2016|Y
01|44600|2|1|Installation Includes: Drive amp bulk head cable set|Y
01|44600|2|2|external cable sets fiber optic cable communication|Y
01|44600|2|3|cables travel and labor for installation on new|Y
01|44600|2|4|Doosan machine.|Y
01|44615|1|1|HSK125A-ER32-4.00|Y
01|44615|3|1|HSK125A-ER32-4.00|Y
01|44616|1|1|Reference RGA# T-47566|Y
01|44616|1|2|CNCZ180LYA-BR s/n: 7031|N
01|44619|2|1|Includes: Drive amps bulk head cable set external|Y
01|44619|2|2|cable set fiber optic cables communication cable|Y
01|44619|2|3|travel and labor for installation on new Doosan DNM650|Y
01|44619|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|44619|3|2|holders.|Y
01|44653|1|1|NBT40-MDSK10-120|Y
01|44654|1|1|200MM 4th and 5th axis table with Mitsubishi motors|Y
01|44654|1|2|model of machine needs to be confirmed|Y
01|44654|1|3|This to determine correct servo motors needed|Y
01|44654|3|1|CONFERMATION OF CABLES NEEDED PRIOR TO ORDER|Y
01|44662|1|1|Remote Control is included.|Y
01|44662|2|1|1 set of 2p is included within one unit.|Y
01|44662|3|1|Remote control is included.|Y
01|44662|4|1|1 set of 2p is included within one unit.|Y
01|44665|7|1|Tool Clamper Head for BT40 tooling also|Y
01|44669|1|1|180MM High Speed Table with Haas Motor and Cable set|Y
01|44708|1|1|This item is quoted at a net price.|Y
01|44716|4|1|TCE-A4140 - Internal Power Cable Alpha 2i|Y
01|44733|1|1|14645  CV50-TH5.00-0100|Y
01|44733|2|1|61262  010-0375|Y
01|44734|1|1|Quoted at a net price only|Y
01|44748|1|1|Non-Cancelable & Non-Returnable|Y
01|44748|2|1|Non-Cancelable & Non-Returnable|Y
01|44774|1|1|Reference RGA# T-46169|Y
01|44774|1|2|CNCZ321LYA s/n: 6877|N
01|44774|27|1|Storage fees as of 3/25/16|Y
01|44776|1|1|Reference RGA# R-47615|Y
01|44776|1|2|2x C5005-0875-5.66|N
01|44798|1|1|Net Price Each|Y
01|44798|1|2|Non-Cancelable & Non-Returnable|Y
01|44814|2|1|This line at no charge as a courtesy to the customer.|Y
01|44821|18|1|*SK Coolant System|Y
01|44829|2|1|This line at no charge as a courtesy to the customer|Y
01|44829|5|1|This line at no charge as a courtesy to the customer|Y
01|44832|1|1|Reference RGA# R-47659|Y
01|44832|1|2|BT40-NX5-153|N
01|44836|1|1|*close out special  - cannot be returned or cancelled|Y
01|44836|3|1|Position block made by Lyndex-Nikken upon receipt of|Y
01|44836|3|2|spindle drawing information|Y
01|44844|7|1|Full 4th Axis install on Makino PS95 w/Fanuc control|Y
01|44844|7|2|includes all hardware driveconnectors travel labor|Y
01|44844|10|2|Installation includes drice servo motor labor|Y
01|44844|10|3|Full 4th axis to Makino PS95 w/ Fanuc OiM control|Y
01|44844|10|4|no additional hardware needed|Y
01|44844|10|5|Air brake Nikken patented worm/wheel design|Y
01|44844|15|1|Three pieces in stock. Estimated time of arrival to|Y
01|44844|15|2|Lyndex-Nikken is 6/6/11.|Y
01|44844|23|1|2 pieces in stock. Estimated time of arrival to|Y
01|44844|23|2|Lyndex-Nikken 6/3/11.|Y
01|44844|33|1|Estimated delivery to Lyndex-Nikken 5/18/11.|Y
01|44844|35|1|Estimated date of delivery to Lyndex-Nikken 5/18/11.|Y
01|44857|1|1|Reference RGA# T-47584|Y
01|44857|1|2|5AX-2MT-105-120FA s/n: 8173|N
01|44857|16|1|Expedite fee of $750.00 to ensure table is repaired|Y
01|44857|16|2|and ready to ship within 5-7 days from receipt of|Y
01|44857|16|3|payment.|Y
01|44881|1|1|T10091 ID Boring Holder 63.5MM|Y
01|44881|3|1|ID Cutting Holder 31.75MM|Y
01|44908|2|1|NT50 Taper Center Socket|Y
01|44908|3|1|Hydraulic Cylinder and Adapter for NT50 Taper Socket|Y
01|44908|4|1|RCN 8380 +/- 2 Big Bore Scale with mounting kit|Y
01|44908|5|1|5 Riser Plate for CNC321LZA-M table|Y
01|44908|7|1|Power & Signal/ Feedback Cable set|Y
01|44908|9|1|5 Riser for H-230S Hydraulic Tailstock|Y
01|44928|22|1|Replacement for discontinued HSK63A-TC0562-4.49|Y
01|44928|23|1|Replacement for discontinued HSK63A-TC0875-5.82|Y
01|44961|1|1|HSK50A-SK6C-105 1 to 19 pcs.|Y
01|44961|2|1|HSK50A-SK6C-105 20 to 29 pcs.|Y
01|44961|3|1|HSK50A-SK6C-105 30 Plus pcs.|Y
01|44961|5|1|HSK50A-SK6C-120 1 to 19 pcs.|Y
01|44961|6|1|HSK50A-SK6C-120 20 to 29 pcs.|Y
01|44961|7|1|HSK50A-SK6C-120 30 Plus pcs.|Y
01|44975|45|1|CAT50-SF14-160|Y
01|44975|45|2|CAT50 14mm Shrink Fit Holder w/ 160mm gage length|Y
01|44983|1|1|200MM table with Nikken controller cable set M-code|Y
01|44983|1|2|cable power cable and pendant. RS232 Cable included.|Y
01|44983|2|1|Installation includes: M-code connection controller|Y
01|44983|2|2|mounting cable managment and RS232 connection.|Y
01|44995|6|1|Free $1000.00 Tooling Promotion|Y
01|45040|1|1|CAT.NO.303I Version|Y
01|45051|1|1|This price is for table without motor.|Y
01|45051|2|1|This price is for table without motor.|Y
01|45051|3|1|Air/Hydraulic Booster - WILL BE NEEDED FOR CNC321|Y
01|45054|1|1|NSVX-400MA DOES NOT INCLUDE MOTOR SAME AS S/N 2080|Y
01|45054|1|2|QUOTE INCLUDES TAT-400 AND 7+1 ROTARY JOINT|Y
01|45054|1|3|NSVX-400 AND TAT400 FACEPLATE NO SLOTS|Y
01|45054|1|4|DELIVERY PENDING|Y
01|45054|1|5|QUOTE INCLUDES ALL ITEMS TABLE TAT & ROTARY UNION|Y
01|45068|1|1|Reference RGA# R-47305|Y
01|45068|1|2|MI63 Adapter|N
01|45068|3|1|MI63 Synax Adapter needs rebuild and replacing of|Y
01|45068|3|2|damaged components.|Y
01|45069|25|1|Retention studs no quote|Y
01|45069|25|2|Please purchase thru Retention Knob supply|Y
01|45080|1|1|BALANCE IN 10 WEEKS|Y
01|45081|2|1|Item quoted as a net price.|Y
01|45081|2|2|Pricing includes modification charge.|Y
01|45093|4|1|Includes: Axis drive bulkhead cable set external|Y
01|45093|4|2|cable set axis expansion card parameter changes|Y
01|45093|4|3|travel and labor for install on Mori DV5100|Y
01|45136|1|1|Wrenches are not included with the live tool. We are|Y
01|45136|1|2|offering at 100% discount with purchase of live tool.|Y
01|45150|1|1|Option #1 (7.087 Diameter Faceplate)|Y
01|45150|4|1|Includes: drive amp bulk head cable set external|Y
01|45150|4|2|cable set fiber optic cable communication cable|Y
01|45150|4|3|travel and labor for installation. ( TWO AXIS)|Y
01|45150|4|4|For Doosan DT3600 w/Fanuc 0im control|Y
01|45150|4|5|need to confirm ladder can support 5 axis|Y
01|45150|4|6|need to confirm parameters are already turned on|Y
01|45151|2|1|Installation includes: Dual axis drive unit short bar|Y
01|45151|2|2|communications cables fiber optic cables bulkhead|Y
01|45151|2|3|cable sets external cable sets parameter changes|Y
01|45151|2|4|service time and travel.|Y
01|45153|1|1|180MM High Speed Left Hand Mounted Fanuc Motor Table|Y
01|45153|3|1|Installation kit: Dual axis drive unit short bar|Y
01|45153|3|2|communications cable fiber optic cable bulkhead|Y
01|45153|3|3|cables and external cables.|Y
01|45154|1|1|Delivery to be determined|Y
01|45155|2|1|Cable kit with amplifier|Y
01|45196|1|1|Includes table with Fanuc motor|Y
01|45196|3|1|**Optional** Dead length 5C Manual Collet Fixture|Y
01|45196|4|1|**Optional** 6 3-Jaw Scroll Chuck and Adapter Plate.|Y
01|45196|6|1|Ext. Cable for RT - Will need purchased if installation|Y
01|45196|6|2|will be done by Jones Machinery.|Y
01|45196|7|1|Ext. Cable for RT - Will need purchased if installation|Y
01|45196|7|2|will be done by Jones Machinery.|Y
01|45196|9|1|Installation Includes: drive amp bulk head cable set|Y
01|45196|9|2|external cable set communication cables travel and|Y
01|45196|9|3|labor for installation on Toyoda FV1116 VMC (1RT/1MT).|Y
01|45207|10|1|1 piece SK10-1/4AC free with the purchase of matching|Y
01|45207|10|2|holder.|Y
01|45249|1|1|Discount based upon quantities quoted if these|Y
01|45249|1|2|should change we will need to requote.|Y
01|45254|2|1|These items are non-returnable & non-cancelable|Y
01|45256|1|1|Table with HAAS Motors and Cables.|Y
01|45256|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|45256|2|2|holders.|Y
01|45263|1|1|Reference RGA# R- 47469|Y
01|45263|1|2|BT40-C7/8-75 Holder is gunked up.|N
01|45263|3|1|Tool is in good condition just needs to be cleaned|Y
01|45263|3|2|and re-greased.|Y
01|45263|4|1|BT40-C7/8-120 Holder is badly pitted this cannot be|Y
01|45263|4|2|repaired.  We recomment replacing this holder.|Y
01|45263|4|3|Replacement to be quoted by Inside Sales - Belinda.|Y
01|45263|5|1|Tool is still in useable condition.  However excessive|Y
01|45263|5|2|pitting is un-repairable.  If customer chooses to|Y
01|45263|5|3|clean up and re-grease unit we cannot warranty this|Y
01|45263|5|4|repair as we are recommending replacing holder.|Y
01|45273|5|1|1pc delivery is pending.|Y
01|45279|1|1|Item is considered a non stock standard once a|Y
01|45279|1|2|purchase order is placed it cannot be cancelled or|Y
01|45279|1|3|returned.|Y
01|45304|8|1|SKJ10-2.5 slotted disk|Y
01|45314|3|1|sub plate if needed 25mm|Y
01|45323|1|1|100MM twin spindle high speed table with motor|Y
01|45323|5|1|installation includes drive hardware connectors|Y
01|45323|5|2|travel labor junction box cable management|Y
01|45323|5|3|Data sheets required|Y
01|45323|5|4|Lyndex Nikken to confirm proper length cables needed|Y
01|45323|5|5|center divider infop needed|Y
01|45339|2|1|Custom Positioning Block made by Lyndex-Nikken Service|Y
01|45339|2|2|Dept per specs provided by Caterpillar.|Y
01|45339|2|3|E/U may make their own Positioning Block with details|Y
01|45339|2|4|provided through Lyndex-Nikken if preferred.|Y
01|45339|3|1|Application approval must be made through Lyndex-Nikken|Y
01|45339|3|2|Tech Dept to confirm Taper Pin style on both Angleheads|Y
01|45339|3|3|Please contact Tim Reeves at 847-367-4800 x72 prior to|Y
01|45339|3|4|placing an order.|Y
01|45340|2|1|Installation Includes: amp bulkhead cable sets ext.|Y
01|45340|2|2|cable sets communication cables travel and labor for|Y
01|45340|2|3|installation of one table on one Doosan DNM500II.|Y
01|45340|4|1|**OPTIONAL**|Y
01|45340|4|2|Air/Hydraulic Booster for CNC260 brake.|Y
01|45340|4|3|Air Brake= 588Nm & Hydraulic Brake= 1568Nm|Y
01|45341|2|1|**OPTIONAL** Air/Hyd Booster for table brake only.|Y
01|45341|3|1|**OPTIONAL** 500PSI unit and quick disconnect hoses for|Y
01|45341|3|2|table brake system. (Recommended to use when using a|Y
01|45341|3|3|TAT support table)|Y
01|45341|5|1|Installation - Includes: bulkhead cable set external|Y
01|45341|5|2|cable set communication cables parameter changes|Y
01|45341|5|3|travel and labor for installation of one table and one|Y
01|45341|5|4|machine each.|Y
01|45341|7|1|Installation Kit - Includes: bulkhead cable set ext.|Y
01|45341|7|2|cable set communication cables for one table and one|Y
01|45341|7|3|machine each.|Y
01|45350|5|1|Not recommended for this application|Y
01|45351|2|1|Option #2 (7.874 Diameter Faceplate)|Y
01|45351|4|1|Includes: drive amp bulk head cable set external|Y
01|45351|4|2|cable set fiber optic cable communication cable|Y
01|45351|4|3|travel and labor for installation.|Y
01|45378|2|1|Installation includes: Drive unit bulkhead cables|Y
01|45378|2|2|external cables short bar communications cable|Y
01|45378|2|3|fiber optic cable parameter changes service time and|Y
01|45378|2|4|travel.|Y
01|45391|10|1|This line is listed at your NET cost|Y
01|45393|1|1|Reference RGA# R-47535|Y
01|45393|1|2|MZQT47-ER16-AD-SUB s/n: 70700137 01|N
01|45393|3|1|Bearings seals and o-rings must be replaced.|Y
01|45393|3|2|Damaged housing and adjustment mechanism must be|Y
01|45393|3|3|replaced. Labor is included.|Y
01|45404|1|1|Reference RGA# R-47669|Y
01|45404|1|2|C40RA-0025M s/n: 49928 12|N
01|45404|3|1|Bearings seals and o-rings are worn and must be|Y
01|45404|3|2|replaced. Labor is included.|Y
01|45404|5|1|Brand new C40RA-0025M|Y
01|45406|1|1|Reference RGA# T-47544|Y
01|45406|1|2|NSVZ300A21 s/n: NA|N
01|45406|5|1|This part table specific and must be made in Japan.|Y
01|45411|1|1|NMTB50-TESTBAR 2 X 14|Y
01|45411|3|1|NNMTB50-TESTBAR 2 X 12|Y
01|45411|5|1|NMTB50-Testbar 1.1/2 X 10.0|Y
01|45417|2|1|Option #2 (7.874 Diameter Faceplate)|Y
01|45418|1|1|1-pc stock/25 pcs 03/05 /3 pcs  13 weeks|Y
01|45430|3|1|This line at no charge as a courtesy to the customer|Y
01|45434|2|1|REPLACEMENT FOR 75TG-SPAN|Y
01|45442|2|1|8 Nikken Rotary Table with Fanuc Servo Motor|Y
01|45442|2|2|NO TAILSTOCK SUPPLIED|Y
01|45442|5|1|STEEL BRAIDED CABLES AVAILABLE UPON REQUEST|Y
01|45442|5|2|THESE CABLE ARE STANDARD FLEX TYPE|Y
01|45448|5|1|Installation Includes: amp bulkhead cables external|Y
01|45448|5|2|cables communication cables parameter changes|Y
01|45448|5|3|travel and labor for installation of one table on one|Y
01|45448|5|4|Mori DV5100 machine.|Y
01|45452|1|1|Reference RGA# R-47579|Y
01|45452|1|2|W1505-0562|N
01|45454|5|1|500PSI Tank and Unit for table and TAT brake systems.|Y
01|45454|6|1|Installation Includes: amp bulkhead cables external|Y
01|45454|6|2|cables communication cables parameter changes|Y
01|45454|6|3|travel and labor for installation of one table on one|Y
01|45454|6|4|Mori DV5100 machine.|Y
01|45466|1|1|Reference RGA# T-47677|Y
01|45466|1|2|5AX-2MT s/n: NA|N
01|45516|1|1|***ALPHA22i Motor***|Y
01|45522|1|1|Conversion to Fanuc: Includes motor gear gearbox|Y
01|45522|1|2|motor cover solenoid pressure switch and labour.|Y
01|45522|2|1|Installation includes: Drive unit external cables|Y
01|45522|2|2|bulkhead cables fiber optic cables communication|Y
01|45522|2|3|cable short bar parameter changes service time and|Y
01|45522|2|4|travel.|Y
01|45527|1|1|Reference RGA# T-47663|Y
01|45527|1|2|5AX-2002FA-M s/n: NA|N
01|45557|9|1|This line at no charge as a courtesy to the customer|Y
01|45558|3|1|*coolant version|Y
01|45558|6|1|Cross from N29101 (PS-O37-1)|Y
01|45558|7|1|Cross from N29101 (PS-O37-1)  *coolant version|Y
01|45558|9|1|Cross from N29110  *non-coolant w/ o-ring under flange|Y
01|45558|9|2|*coolant version n/a|Y
01|45558|11|1|Cross from N29105 (Nikken PS-381E)  *coolant version|Y
01|45558|11|2|*non-coolant version n/a|Y
01|45558|15|1|Cross from N29116 (Nikken PS-O19) *non-coolant|Y
01|45558|16|1|Cross from N29116 (Nikken PS-O19) *coolant version|Y
01|45558|19|1|Cross from N29127 *non-coolant w/ o-ring under flange|Y
01|45558|19|2|*coolant version n/a|Y
01|45558|22|1|Cross from N29122 (Nikken PS-O58)  *coolant version|Y
01|45558|22|2|*non-coolant n/a|Y
01|45580|1|1|Discount Reflects purchase of 1 to 2 tools.|Y
01|45580|2|1|Discount reflects purchase of 3 pr more tools.|Y
01|45601|9|1|Please see attached Incentives Sheet for Collet Promo|Y
01|45601|9|2|Discount applied to ER25 Collets. Must be purchased at|Y
01|45601|9|3|same time as matching Collet Chuck for 35% discount.|Y
01|45603|1|1|28 PCS STOCK 20 PCS IN 1-2 WEEKS|Y
01|45603|2|1|3 PCS STOCK BALANCE IN 10 WEEKS|Y
01|45603|3|1|18 PCS STOCK BALANCE IN 10 WEEKS|Y
01|45603|4|1|26 PCS STOCK 35 PCS IN 1-2 WEEKS|Y
01|45603|5|1|24 PCS STOCK BALANCE IN 10 WEEKS|Y
01|45605|1|1|This NIKKEN 5AX-201FA-M IS DUPLICATE OF S/N 5148|Y
01|45605|1|2|1 PC 5AX-201FA-M TO TO BE EXCHANGED FOR|Y
01|45605|1|3|5AX-350FA-M UNUSED IN CRATE AT JTEKT|Y
01|45605|3|1|Ship to JTEKT -Do Not Assemble to Rotary Table|Y
01|45605|4|1|Ship to JTEKT -Do Not Assemble to Rotary Table|Y
01|45605|5|1|Ship to JTEKT -Do Not Assemble to Rotary Table|Y
01|45605|6|1|Ship to JTEKT -Do Not Assemble to Rotary Table|Y
01|45605|7|1|Ship to JTEKT -Do Not Assemble to Rotary Table|Y
01|45616|3|1|Quoted customer at a net price including modification|Y
01|45616|3|2|charge. 288.40USD|Y
01|45624|1|1|9TP200-S: TP200 Stylus Body|Y
01|45680|1|1|BT50 Taper ER40 Output No Coolant Flange Mounted|Y
01|45680|1|2|custom RAH. We will delete the 360-Deg adjustabiliy|Y
01|45680|1|3|to reach higher ridigity. Part Number TBD|Y
01|45680|3|1|BT50 Taper ER40 Output No Coolant Flange Mounted|Y
01|45680|3|2|custom RAH. We will delete the 360-Deg adjustabiliy|Y
01|45680|3|3|to reach higher ridigity. Part Number TBD|Y
01|45690|3|1|2-3 week delivery|Y
01|45690|4|1|Scale Mounting Kit|Y
01|45690|4|2|4 week delivery|Y
01|45701|6|1|One per purchase of matching taper holder.|Y
01|45704|1|1|Reference RGA# T-47703|Y
01|45704|1|2|TCD-72048|N
01|45707|1|1|Reference RGA# T-47617|Y
01|45707|1|2|CNC180BFA s/n: 10356|N
01|45717|2|1|NIKKEN 5AX-201 WITHOUT MOTOR OR CABLING|Y
01|45717|2|2|APPLIED TO PROVIDE MOTORS AND CABLE HARNESS TO L/N|Y
01|45717|2|3|ALSO EXTERNAL CABLES TO BE PROVIDED LYNDEX TO INSTALL|Y
01|45717|4|1|LYNDEX TO CONFIRM VOLTAGE|Y
01|45724|1|1|Reference RGA# T-47611|Y
01|45724|1|2|5AX-151ZA s/n: NA|N
01|45728|4|1|Tool is non standard stock once a purchase order is|Y
01|45728|4|2|placed it cannot be cancelled or returned.|Y
01|45728|5|1|Substitute for MNZ20-BG25MMZ-MSD-C|Y
01|45728|7|1|Tool is non standard stock once a purchase order is|Y
01|45728|7|2|placed it cannot be cancelled or returned.|Y
01|45735|1|1|Reference RGA# T-47652|Y
01|45735|1|2|5AX-350FA-R36 s/n: 3515|N
01|45739|69|1|*Special Pricing - Qty can match Qty of CAT50 studs|Y
01|45748|1|1|Reference RGA# R-47713|Y
01|45748|1|2|MZQT47-ER16-AD s/n: 62147 01|N
01|45748|3|1|Damaged bevel gear set must be replaced. Bearings|Y
01|45748|3|2|seals and o-rings must also be replaced. Labor is|Y
01|45748|3|3|included.|Y
01|45755|1|1|Shrink Fit Unit Alone|Y
01|45755|2|1|Shrink Fit Unit + 10 HSK40E Shrink Fit Holder Package|Y
01|45764|2|1|With purchase of a matching tool holder|Y
01|45776|4|1|Tool is non standard stock once a purchase order is|Y
01|45776|4|2|placed it cannot be cancelled or returned.|Y
01|45776|5|1|Substitute for MNZ20-BG25MMZ-MSD-C|Y
01|45776|7|1|Tool is non standard stock once a purchase order is|Y
01|45776|7|2|placed it cannot be cancelled or returned.|Y
01|45777|17|1|*for HSK100A 20mm Milling Chuck|Y
01|45777|18|1|*for HSK100A 20mm Milling Chuck|Y
01|45777|19|1|*for HSK100A 20mm Milling Chuck|Y
01|45777|23|1|N/A in Dual-Contact (TP)|Y
01|45777|25|1|*For HSK100A 20mm Milling Chuck|Y
01|45777|26|1|*For HSK100A 20mm Milling Chuck|Y
01|45777|27|1|*For HSK100A 20mm Milling Chuck|Y
01|45779|6|1|TOOL CERTIFICATE WORTH $ 1000 LIST PRICE|Y
01|45791|1|1|400MM rotary table with air/hyd booster and Yaskawa|Y
01|45791|1|2|motor.|Y
01|45794|1|1|100MM twin spindle high speed table with motor|Y
01|45794|5|1|installation includes drive hardware connectors|Y
01|45794|5|2|travel labor cable management|Y
01|45794|5|3|Data sheets required|Y
01|45794|5|4|Lyndex Nikken to confirm proper length cables needed|Y
01|45794|5|6|INTSALL TABLL TO 1 PALLET. PALLET HAS NOT T-SLOTS|Y
01|45794|5|7|LYNDEX NIKKEN NOT RESPONSIBLE TO MOUNT TABLE|Y
01|45794|5|8|mIDACO PALLET SYSTEM WITH MIDACO CABLE MANAGEMENT|Y
01|45794|8|1|CABLES TO BE CONFIRM FOR LENGTH AND CONNECTORS|Y
01|45801|1|1|Reference RGA# R-47001|Y
01|45801|1|2|C50RAM-ER32-180TS s/n: 11970 02|N
01|45801|3|1|Bearings seals and o-rings are worn and must be|Y
01|45801|3|2|replaced. Labor is included.|Y
01|45827|1|1|Reference RGA# R-47698|Y
01|45827|1|2|Discount reflects core trade-in.|Y
01|45833|1|1|Reference RGA# R-47697|Y
01|45833|1|2|C40RA-0025 s/n: NA|N
01|45836|1|1|Reference RGA# R-47719|Y
01|45836|1|2|1x HSK63A-C1-100|N
01|45837|1|1|This item is non-returnable & non-cancelable|Y
01|45838|1|1|Reference RGA# R-47706|Y
01|45838|1|2|1x CAT50U-NX5-151|N
01|45838|13|1|Spindle has grooves and must be resurfaced.|Y
01|45838|13|2|Modification will be completed in 2-3 weeks.|Y
01|45872|2|1|Installation help travel and labor for Alpha21 table.|Y
01|45872|2|2|OPTIONAL|Y
01|45885|1|1|Option #1|Y
01|45885|2|1|Installation Includes: drive amp bulk head cable set|Y
01|45885|2|2|external cable set communication cables travel and|Y
01|45885|2|3|labor for installation of one table on one machine.|Y
01|45885|4|1|Option #2|Y
01|45887|2|1|Installation Includes: drvie amp bulk head cable set|Y
01|45887|2|2|external cable set communication cables travel and|Y
01|45887|2|3|labor for installation of one table on one machine.|Y
01|45887|4|1|Option #2|Y
01|45887|4|2|Table with motor.|Y
01|45887|7|1|Free $1K Tooling Certificate good for list price tool|Y
01|45887|7|2|holders.|Y
01|45909|2|1|Cable kit with amplifier|Y
01|45929|1|1|This item is non-returnable & non-cancelable|Y
01|45933|1|1|KM42-14.95 collet|Y
01|45933|1|2|*5pc min required|Y
01|45943|4|1|This line is listed at your NET cost|Y
01|45956|1|1|Del: 2 stock/ Bal 1-pc/2-wks/1-pc/4 wks|Y
01|45968|5|1|MT#3 Center Socket|Y
01|45969|2|1|BALANCE PENDING|Y
01|45971|1|1|Option #1|Y
01|45971|2|1|Option #2|Y
01|45971|4|1|Installation Includes: drive amp bulk head cable set|Y
01|45971|4|2|external cable set communication cables parameter|Y
01|45971|4|3|changes travel and labor for one table on one machine|Y
01|45971|4|4|OPTION #1 - 1 Table on 1 Machine|Y
01|45971|6|1|Installation Includes: drive amp bulk head cable set|Y
01|45971|6|2|external cable set communication cables parameter|Y
01|45971|6|3|changes travel and labor for installation of two|Y
01|45971|6|4|tables on two machines. One table per machine.|Y
01|45971|6|5|OPTION #2 - 1 Table on 1 Machine X 2|Y
01|45996|1|1|Reference RGA# T-47700|Y
01|45996|1|2|CNC180FA s/n: 8830|N
01|45998|1|1|200MM 4th & 5th axis table with Haas motor & cables set|Y
01|45998|1|2|with pneumatic brake system with Haas home switch|Y
01|46005|3|1|Pricing and delivery pending with Nikken Japan.|Y
01|46005|3|2|Pricing is old pricing from 2010 and may change once|Y
01|46005|3|3|we have a response from Nikken Japan.|Y
01|46013|1|1|Item is considered a non stock standard once a|Y
01|46013|1|2|purchase order is placed it cannot be cancelled or|Y
01|46013|1|3|returned.|Y
01|46023|1|1|CAT50U-FMAO31.725-623 CAT50 1.1/4 Coolant Inducer Oil|Y
01|46023|1|2|Hole Holder Shell Mill 623mm GL Special|Y
01|46023|1|3|ETA aprox 15 weeks after receipt of signed drawings|Y
01|46023|1|4|Aprox shipping weight - 52 lbs.|Y
01|46027|4|1|This line at no charge as a courtesy to the customer.|Y
01|46027|15|1|This line at no charge as a courtesy to the customer.|Y
01|46030|1|1|HSK63A-SK6C-100P-B|Y
01|46033|1|1|Repair transit time expenses and labor charges for|Y
01|46033|1|2|Service call completed by Armando Mena from 2/10-2/12|Y
01|46033|1|3|Parts are under warranty; labor and expenses related|Y
01|46033|1|4|are not but have been discounted at 50% as a one-time|Y
01|46033|1|5|courtesy.|Y
01|46033|2|1|Airfare & Car Rental: $706.64|Y
01|46033|2|2|Transit Time: 14.58 hrs x $100.00/hr = $1458.00|Y
01|46033|2|3|Gas & Parking: $75.00|Y
01|46033|2|4|Hotel: 2 Nights x $175.00/night = $350.00|Y
01|46038|1|1|CV50-CC7.50-1000  CAT50 100TG Collet Chuck 7.50 GL|Y
01|46040|1|1|Non-Cancelable & Non-Returnable|Y
01|46045|5|1|BALANCE IN 1 WEEK|Y
01|46045|6|1|BALANCE IN 1 WEEK|Y
01|46049|1|1|High Voltage Fanuc A8iS/4000HV A1000i Motor|Y
01|46049|1|2|Fanuc # A06B-0236-B000 - Currently in Stock from Fanuc|Y
01|46049|2|1|Heidenhain Scale +/- 3|Y
01|46049|2|2|Scale will be Absolute Spec|Y
01|46049|2|3|Complete with Scale/Cable and Mounting Kit|Y
01|46049|2|4|Scale - In Stock from Heidenhain|Y
01|46049|2|5|Scale Mount Kit - ETA 4 weeks from Nikken Japan|Y
01|46049|3|1|Custom 24' Cables per customer's request|Y
01|46049|3|2|Heidenhain Scale and Feedback Encoder as one cable|Y
01|46049|3|3|Power Cable as second cable|Y
01|46049|3|4|Amphenol connectors for table side loose wires|Y
01|46049|3|5|at the end to wire direct to cabinet.|Y
01|46055|1|1|Reference RGA# T-47646|Y
01|46055|1|2|5AX-201FA s/n: 3616|N
01|46088|3|1|B5017-0025B(Stock 9pc) offered as an alternative.|Y
01|46088|3|2|for B5017-0025-4.00|Y
01|46091|1|1|NCAT40-TESTBAR-14.00  2 X 14 with wooden case|Y
01|46112|1|1|Reference RGA# R-47655|Y
01|46112|1|2|HP-6|N
01|46112|3|1|Price reflects one time courtesy discount.|Y
01|46114|1|1|MIT50-MMC8C-105 3-Lock|Y
01|46114|2|1|NIT50-MMC8C-105  Taper Plus Holder|Y
01|46124|3|1|Used Units in the Picture attached.|Y
01|46126|1|1|Reference RGA# R-47739|Y
01|46126|1|2|CAT50U-NX5-151|N
01|46126|9|1|Freight charges from customer to Lyndex-Nikken|Y
01|46126|9|2|For evaluations and repair customer is responsible for|Y
01|46126|9|3|freight charges to and from Lyndex-Nikken.|Y
01|46127|1|1|Net Price EA Non-Cancelable & Non-Returnable|Y
01|46127|2|1|Net Price EA Non-Cancelable & Non-Returnable|Y
01|46147|1|1|KM1.1/4-49/64  Straight Collet|Y
01|46147|3|1|KM1.1/4-21/32 Straight Collet|Y
01|46165|1|1|Special ZMAC Unit: M4HZ-466CD2|Y
01|46168|1|1|Non-Cancelable & Non-Returnable|Y
01|46184|1|1|Nikken 10 Rotary table with Mitsubishi Motor.|Y
01|46184|1|2|Exact Motor Specification to be determined.|Y
01|46184|3|1|4th axis installation including Servo Drive connectors|Y
01|46184|3|2|inside wire harness machine internal cables parameter|Y
01|46184|3|3|travel labor all expenses.|Y
01|46184|3|4|Hardinge V1000 w/mitsubishi control|Y
01|46184|4|1|25 meter Power & Signal cable.  To be specified!|Y
01|46184|5|1|2.5 meter Feedback cable.  To be specified|Y
01|46196|1|1|Reference RGA# T-47727|Y
01|46196|1|2|5AX-201YA-M-AB s/n: 4201|N
01|46196|9|1|Freight charges from customer to Lyndex-Nikken.|Y
01|46196|9|2|Customer is responsible for freight charges to and|Y
01|46196|9|3|from Lyndex-Nikken as this is not covered under|Y
01|46196|9|4|warranty due to table being crashed.|Y
01|46200|1|1|Table with Okuma Motor|Y
01|46200|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|46200|2|2|holders.|Y
01|46200|5|1|OPTIONAL - Tail Support Table with Brake|Y
01|46200|7|1|OPTIONAL - Manual Tailstock with Removable Dead Center|Y
01|46204|1|1|Table with Okuma Motors - Air Brake|Y
01|46204|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|46204|2|2|holders.|Y
01|46204|5|1|OPTIONAL - This table is also capable of Hydraulic|Y
01|46204|5|2|Braking.  For Hydraulic Braking this unit will need|Y
01|46204|5|3|purchased and the Table Part Number will change to the|Y
01|46204|5|4|following: 5AX-201OSP3-M.  This MUST be noted on any|Y
01|46204|5|5|orders that require hydraulic braking.|Y
01|46209|1|1|Table with Fanuc Motors - Hydraulic Brakes|Y
01|46209|2|1|500 psi unit and quick disconnect hoses for table brake|Y
01|46209|2|2|systems.|Y
01|46209|3|1|Installation Includes: New Drive Amp External Cable|Y
01|46209|3|2|Sets Communication Cables Parameter Changes Travel|Y
01|46209|3|3|and Labor for installation of one 5AX table on one Mori|Y
01|46209|3|4|NV5000. (Pricing reflects discounting for usable|Y
01|46209|3|5|components of existing interface as well as discounted|Y
01|46209|3|6|travel charge because of doing multiple machines on one|Y
01|46209|3|7|visit.)|Y
01|46209|4|1|Free $1K Tooling Certificate with each table good for|Y
01|46209|4|2|list price tool holders.|Y
01|46218|2|1|Special Net Price|Y
01|46218|2|2|Non-Cancelable & Non-Returnable|Y
01|46258|1|1|Reference RGA# T-47767|Y
01|46258|1|2|CNCZ105LSA-BR s/n: 2065|N
01|46261|1|1|Cross from Benz# E4-40-32|Y
01|46264|1|1|Stock in Japan|Y
01|46264|1|2|Non-Cancelable & Non-Returnable|Y
01|46267|1|1|Table with Okuma Motor - Air Brake|Y
01|46267|3|1|Table with Okuma Motors - Hyd Brake Only|Y
01|46267|4|1|500 PSI unit and quick disconnect hoses for table brake|Y
01|46267|4|2|systems. (Needed for the 5AX-250OSP3-M)|Y
01|46267|7|1|Free $1K Tooling Certificate good for list price tool|Y
01|46267|7|2|holders.|Y
01|46299|1|1|CAT40 Adjustable RAH for Customer's 5 degree drilling|Y
01|46299|1|2|application.|Y
01|46299|2|1|Customer to supply needed information for design and|Y
01|46299|2|2|manufacturing of Positioning Block.  Lyndex-Nikken to|Y
01|46299|2|3|design and manufacture Positioning Block.|Y
01|46300|2|1|Installation: Drive unitshort barcommunications cable|Y
01|46300|2|2|fiber optic cablebulkhead cable setexternal cables|Y
01|46300|2|3|parameter changes service time and travel.|Y
01|46300|2|4|Installation with no DDR drive in the machine.|Y
01|46300|3|1|Installation: Bulkhead cable set external cables|Y
01|46300|3|2|parameter changes service time and travel.|Y
01|46300|3|3|With DDR drive included with the machine.|Y
01|46300|5|1|Installation: External cable set parameter changes|Y
01|46300|5|2|service time and travel.|Y
01|46300|5|3|With DDR drive included with the machine.|Y
01|46313|1|1|Reference RGA# R-47759|Y
01|46313|1|2|B40RAM-ER32-187 s/n: 61550 01|N
01|46313|3|1|Bearings seals and o-rings must be replaced. Spindles|Y
01|46313|3|2|must be resurfaced as needed. Labor is included.|Y
01|46313|3|3|Additional 15% discount per Tim Reeves.|Y
01|46314|7|1|INCLUDES 4TH AXIS SERVO CABLES CONNECTORS LABOR|Y
01|46314|7|2|TRAVEL EXPENSES. CONTROL TYPE FANUC.|Y
01|46337|2|1|This line at no charge as a courtesy to the customer|Y
01|46337|3|1|This line at no charge as a courtesy to the customer|Y
01|46338|1|1|Normal discount is 37% additional discount has been|Y
01|46338|1|2|quoted to have customer replace damaged holder instead|Y
01|46338|1|3|of sending in for repair.  Should the customer still|Y
01|46338|1|4|want to send in their hold for evaluation this|Y
01|46338|1|5|quotation will no longer be valid.|Y
01|46338|2|1|Normal discount is 30%.  Additional discount has been|Y
01|46338|2|2|quoted to have customer replace damaged holder instead|Y
01|46338|2|3|of sending in for evaluation.  Should your customer|Y
01|46338|2|4|still want to send in the damaged holder for evaluation|Y
01|46338|2|5|this quotation will no longer be valid.|Y
01|46345|2|1|500PSI tank and unit for table brake systems.|Y
01|46345|3|1|Free Extended Warranty - 1 Year (2 Yrs Total Warranty)|Y
01|46345|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|46345|4|2|holders.|Y
01|46381|1|1|Arthur will need to purchase the 4th axis I/F from|Y
01|46381|1|2|Kitamura and the M10/M11 clamp unclamp interface for|Y
01|46381|1|3|the collet chuck|Y
01|46389|4|1|Heidenhain big bore scale +/- 3 seconds with mounting|Y
01|46389|4|2|kit.|Y
01|46389|5|1|NT50 taper center socket with manual draw bolt.|Y
01|46389|9|1|Installation includes: Drive unit short bar fiber|Y
01|46389|9|2|optic cable communications cable bulkhead cables|Y
01|46389|9|3|external cables parameter changes service time and|Y
01|46389|9|4|travel.|Y
01|46391|1|1|Reference RGA# R-47782|Y
01|46391|1|2|#1 T32475/MNZ20-ER32X sn: A0054|N
01|46391|3|1|Collet nut bearings seals and o-rings are worn and|Y
01|46391|3|2|must be replaced. Labor is included.|Y
01|46391|5|1|#2 T32275/MNZ20-ER25Z sn: A0780|N
01|46391|7|1|Bearings seals and o-rings are worn and must be|Y
01|46391|7|2|replaced. Collet nut and spindle are also worn and|Y
01|46391|7|3|must be replaced. Labor is included.|Y
01|46391|9|1|#3 T32275/MNZ20-ER25Z sn: A0843|N
01|46391|11|1|Bearings seals and o-rings are worn and must be|Y
01|46391|11|2|replaced. Collet nut and spindle are also worn and must|Y
01|46391|11|3|be replaced. Labor is included.|Y
01|46391|13|1|#4 T32255/MNZ20-ER20Z sn: A0500|N
01|46391|15|1|Bearings seals and o-rings are worn and must be|Y
01|46391|15|2|replaced. Collet nut and spindle are also worn and must|Y
01|46391|15|3|be replaced. Labor is included.|Y
01|46391|17|1|#5 T32275/MNZ20-ER25Z sn: A0843|N
01|46391|19|1|Bearings seals and o-rings are worn and must be|Y
01|46391|19|2|replaced. Collet nut and spindle are worn and must also|Y
01|46391|19|3|be replaced. Labor is included.|Y
01|46391|21|1|#6 T32288/ MNZ20-ER20Z-C-7MP sn: A0082|N
01|46391|23|1|We do not have capabilities to accurately repair this|Y
01|46391|23|2|tool here in the US due to it being coolant thru.|Y
01|46391|23|3|This must be sent to Japan for repair.|Y
01|46391|23|4|Labor is included.|Y
01|46394|1|1|Item quoted as a net price.|Y
01|46398|3|1|Lyndex-Nikken can make position block upon receipt|Y
01|46398|3|2|of spindle drawing information|Y
01|46399|6|1|This line at no charge as a courtesy to the customer|Y
01|46399|21|1|This line at no charge as a courtesy to the customer|Y
01|46416|1|1|Tooling Certificate Number: 13687-745-021516|Y
01|46440|7|1|4TH AXIS FULL INSTALLATION- INCLUDING AMPLIFIER CABLES|Y
01|46440|7|2|CONNECTORS WIRE HARNESS TRAVEL LABOR PARAMETERS|Y
01|46440|7|3|MACHINE KITAMURA 4XD WITH ARUMATIK CONTROL|Y
01|46441|1|1|BASED UPON FACTORY 4TH AXIS INTERFACE|Y
01|46442|1|1|HAAS Motors and Cables - AIR BRAKE|Y
01|46442|2|1|Free Extended Warranty - 1 Year (2 Years Total)|Y
01|46442|3|1|This item is Non-Cancellable and Non-Returnable.|Y
01|46443|1|1|Table with motors set up for hydraulic braking.|Y
01|46443|2|1|RN45 Fixture System|Y
01|46443|3|1|Hydraulic Pancake Cylinder to work with RN45-85X32.|Y
01|46443|4|1|Custom Riser Plates for 5AX-2002FA-M to accomodate the|Y
01|46443|4|2|pancake cylinder for RN45 System.|Y
01|46446|1|1|Arthur will need to purchase the 4th axis I/F from|Y
01|46446|1|2|Kitamura and the M10/M11 clamp unclamp interface for|Y
01|46446|1|3|the collet chuck|Y
01|46458|1|1|DEL 2PC=4 Weeks/Balance 9 Weeks|Y
01|46458|2|1|DEL 1PC=4 Weeks/ Balance 8-10 Weeks|Y
01|46458|3|1|Wrenches for MZQT5-CT40X-OFF-C & MZQT5-CT40Z-C|Y
01|46458|4|1|DEL 3 Weeks|Y
01|46458|6|1|DEL 3 Weeks|Y
01|46474|1|1|Reference RGA# T-47728|Y
01|46474|1|2|5AX-2002 s/n: 1391|N
01|46474|32|1|RN45 Taper Flange|Y
01|46479|1|1|20 pcs in 6 weeks balance in 10 weeks|Y
01|46479|2|1|Balance in 2 weeks|Y
01|46483|1|1|This line at no charge as a courtesy to the customer|Y
01|46497|1|1|20 pcs in 6 weeks balance in 10 weeks|Y
01|46497|2|1|Balance in 2 weeks|Y
01|46502|2|1|Installation Includes: Converting existing interface to|Y
01|46502|2|2|DD interface.  New amps bulkhead cable sets external|Y
01|46502|2|3|cables sets communication cables parameter changes|Y
01|46502|2|4|travel and labor for one 5AX table on one Mori NV5000.|Y
01|46515|2|1|Includes drive amp bulk head cable sets external|Y
01|46515|2|2|cable sets fiber optic cable communication cable|Y
01|46515|2|3|travel and labor for installation.|Y
01|46525|2|1|Installtion: Drive unit external cables short bar|Y
01|46525|2|2|jnao;o'qrrerergpr|N
01|46525|4|1|Manual tailstock with hanjmfpasj|Y
01|46528|1|1|Table with Fanuc Motor|Y
01|46528|2|1|External Cable for CNC260 - Power and Signal|Y
01|46528|3|1|External Cable for CNC260 - Encoder Feedback|Y
01|46528|4|1|Installation Kit - Includes: Drive amp bulkhead cable|Y
01|46528|4|2|set communication cables for one machine interface.|Y
01|46534|1|1|10 Option|Y
01|46534|2|1|12 Option|Y
01|46535|1|1|5AX-2MT-201-250FA-M with motors|Y
01|46538|1|1|320MM table with Haas motor and cable set.|Y
01|46538|1|2|Table will be set up for air/hyd booster.|Y
01|46558|1|1|BT50-SK16-300-J|Y
01|46584|1|1|HSK63A-MDSK13-80 Nikken Slim Chuck Holder SK13|Y
01|46584|3|1|HSK63A-C12EX-95  Nikken Extreme Milling Chuck|Y
01|46606|1|1|Mim part #104937 MZQT5-OD10X Center Bolts|Y
01|46608|1|1|Mimatic 104937 Center Bolt for MZQT5-OD10X|Y
01|46617|2|1|This items is non-standard stock. Once a purchase|Y
01|46617|2|2|order has been issued this item is non-cancellable and|Y
01|46617|2|3|non-returnable.|Y
01|46628|1|1|TABLE WITH HAAS MOTORS AND CABLES|Y
01|46631|1|1|Howa H037M5  A4-J Adapter Plate|Y
01|46631|3|1|Steel Pie Jaws for HW-05-HS|Y
01|46632|1|1|105MM twin spindle tilting rotary table with Haas motor|Y
01|46632|1|2|and cable set.|Y
01|46637|5|1|Installation: Drive unit short bar fiber optic cable|Y
01|46637|5|2|communications cable bulkhead cable external cable|Y
01|46637|5|3|parameter changes service time and travel.|Y
01|46647|1|1|DUAL CONTACT|Y
01|46647|2|1|DUAL CONTACT|Y
01|46647|3|1|DUAL CONTACT|Y
01|46647|5|1|STANDARD CAT40|Y
01|46647|6|1|STANDARD CAT40|Y
01|46664|1|1|Reference RGA# R-47758|Y
01|46664|1|2|NCAT50-C3/4-105UG|N
01|46664|5|1|Labor is $110.00/hour. Price reflects 1.5 Hours of|Y
01|46664|5|2|labor.|Y
01|46666|1|1|Reference RGA# R-47768|Y
01|46666|1|2|#1 CAT40-UMT200UH|N
01|46666|7|1|#2 CAT40-UMT200UH|N
01|46666|10|1|Labor is $110.00/hour. Price reflects 1.5 hours of|Y
01|46666|10|2|labor.|Y
01|46668|1|1|Net Price Each|Y
01|46668|2|1|Net Price Each|Y
01|46680|3|1|Qty Break Pricing|Y
01|46710|2|1|500PSI Unit and tank for table brake systems only.|Y
01|46710|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|46710|3|2|holders.|Y
01|46710|4|1|ALL WARRANTIES COVER PARTS AND LABOR FOR MANUFACTURER|Y
01|46710|4|2|DEFECTS.  WARRANTIES DO NOT COVER NORMAL WEAR OR ANY|Y
01|46710|4|3|ABNORMAL IMPACT/CONTACT TO THE TABLE.  CUSTOMER WILL BE|Y
01|46710|4|4|RESPONSIBLE FOR ANY COSTS NOT COVERED UNDER WARRANTY.|Y
01|46710|4|5|$1500 - 1 Year of extra warranty for existing table.|Y
01|46710|4|6|$1500 - 1 Year of extra warranty for 2nd existing table|Y
01|46710|4|7|$1500 - 3rd Year of warranty for new table (2yrs Free).|Y
01|46710|4|8|This warranty package will give GCG one year warranty|Y
01|46710|4|9|on the two existing tables they have and a total of|Y
01|46710|4|10|three years warranty on the new table purchased.|Y
01|46735|1|1|3 pcs=1 set|Y
01|46735|10|1|Soft Jaws for H037M5/HW-SJ-04-HS-1.5S-25/3 pcs/1 set|Y
01|46750|1|1|Table with Motor|Y
01|46750|5|1|Installation Includes: Drive amp bulkhead cable set|Y
01|46750|5|2|external cable set communication cables parameter|Y
01|46750|5|3|changes travel and labor for one tabe on one machine.|Y
01|46750|6|1|Free $1K Tooling Certificate good for list price tool|Y
01|46750|6|2|holders.|Y
01|46767|1|1|Table with Motor|Y
01|46767|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|46767|3|2|external cable set parameter changes travel and|Y
01|46767|3|3|labor for installation of one table on one machine.|Y
01|46767|5|1|Installation KIT Includes: Drive amp bulkhead cable|Y
01|46767|5|2|set external cable set for one table on one machine.|Y
01|46768|1|1|B4007-0016-3.50 DIN modified/once a purchase order is|Y
01|46768|1|2|placed it cannot be cancelled or returned.|Y
01|46768|2|1|DIN Modification charge for B4007-0016-3.50 2-Hole|Y
01|46768|2|2|Quoted as a NET price.|Y
01|46768|4|1|This holder is a non standard stock item once a|Y
01|46768|4|2|purchase order is placed it cannot be cancelled or|Y
01|46768|4|3|returned.|Y
01|46787|13|1|Crossover of Command part# B2E4-0250|Y
01|46787|14|1|Crossover of Command part# RB2M-0001-C|Y
01|46803|1|1|The above item is a non-standard stock item.|Y
01|46807|2|1|7.073.271|Y
01|46822|1|1|5AX-201MA-M-AB with air brake system and Mitsubishi|Y
01|46822|1|2|motors.|Y
01|46849|33|1|*use with SK6 attachment|Y
01|46849|36|1|*Use with larger size attachments|Y
01|46866|7|1|Special order item quoted at NET COST.|Y
01|46867|1|1|Non-Cancelable & Non-Returnable|Y
01|46867|1|2|Special Net Price.|Y
01|46890|1|1|The above item weighs 8.60 lbs.|Y
01|46890|2|1|The above item weighs 3.55 lbs.|Y
01|46891|5|1|VCN-13B is not a matching collets for HSK63A/Holders|Y
01|46899|1|1|X-Axis Straight V Type Shell Mill Holder for 22mm pilot|Y
01|46899|1|2|Machine: Mazak Hyper Quadrex 150|Y
01|46911|6|1|CONFIRMATION OF LENGTH AND CONNECTOR FOR CABLES|Y
01|46914|1|1|EXTERNAL CABLES OSP SERVO MOTOR CONNECTORS INCLUDED|Y
01|46930|1|1|Includes solenoid + 2 magnet sensors for clamp/unclamp|Y
01|46935|1|1|Item quoted as a net price.|Y
01|46940|1|1|Non-Cancelable & Non-Returnable|Y
01|46941|1|1|105mm Tilt and rotary table with Yaskawa Sigma 5 motors|Y
01|46941|1|2|Complete with Has motors cable set and Haas|Y
01|46941|1|3|tilt overtravel switch|Y
01|46941|2|1|105mm Tilt and Rotary table with Yaskawa Sigma 5 motors|Y
01|46941|2|2|Complete with Has motors cable set and Haas|Y
01|46941|2|3|tilt overtravel switch|Y
01|46941|2|4|This unit required for scale cleareance|Y
01|46941|2|5|No through hole on tilt axis with scales installed|Y
01|46941|3|1|Heidenhain scale kit for rotary and tilt axis|Y
01|46948|2|1|Wrench added for consideration.|Y
01|46949|2|1|This item at no charge as a courtesy to the customer.|Y
01|46962|34|1|*for SK16-7.5 (drill size 0.2812)|Y
01|46962|49|1|*for SK16-13.5 (drill size 0.5156)|Y
01|46981|10|1|This line is listed at your NET cost|Y
01|46987|1|1|Quote for table only no motors no fixturing|Y
01|47004|1|1|Special Net Price|Y
01|47004|1|2|Non-Cancelable & Non-Returnable|Y
01|47004|2|1|Special Net Price|Y
01|47004|3|1|Special Net Price|Y
01|47007|1|1|Non-Returnable & Non-Cancelable|Y
01|47009|3|1|Installatiopn Kit: Drive unit short bar fiber optic|Y
01|47009|3|2|cable communications cable bulkhead cables external|Y
01|47009|3|3|cables.|Y
01|47011|1|1|Reference RGA# R-47819|Y
01|47011|1|2|#1 PF-2|N
01|47011|3|1|Batteries must be replaced.|Y
01|47011|6|1|Reference RGA# R-47819|Y
01|47011|6|2|#2 PF-2|N
01|47015|1|1|Nikken table does not have servo motor|Y
01|47024|1|1|Reference RGA# R-47761|Y
01|47024|1|2|MNZ20-ER32X s/n: A0022|N
01|47024|3|1|Collet nut bearings seals and o-rings are worn and|Y
01|47024|3|2|must be replaced. Labor is included.|Y
01|47027|1|1|C50FHM-MI50-215-110TP|Y
01|47027|1|2|CAT50 Flex Head with MI50-quick change (no coolant)|Y
01|47027|1|3|110mm tapered pin.|Y
01|47045|1|1|Reference RGA# R-47762|Y
01|47045|1|2|OKA00-20001 s/n: AL100|N
01|47045|3|1|Collet nut bearings seals and o-rings are worn and|Y
01|47045|3|2|must be replaced. Labor is included.|Y
01|47086|1|1|C40RAM-ER25-215ST-80TP  CAT40-ER25 Slim Type with 80mm|Y
01|47086|1|2|Taper Pin|Y
01|47086|3|1|C40RAM-ER25-215ST-80TP  CAT40-ER25 Slim Type with 80mm|Y
01|47086|3|2|Taper Pin|Y
01|47091|4|1|A5 Adapter Plate for HW-06-HS (H037M6)|Y
01|47101|1|1|Price reflects net charge on above holder|Y
01|47107|1|1|available by march 28|Y
01|47107|1|3|available by march 28|Y
01|47109|1|1|200MM tilt rotary table with pneumatic brake system.|Y
01|47109|2|1|Installation: Dual axis drive unit short bar fiber|Y
01|47109|2|2|optic cables communications cables bulkhead cables|Y
01|47109|2|3|external cables parameter changes service time and|Y
01|47109|2|4|travel.|Y
01|47120|1|1|Special Net Price|Y
01|47120|1|2|This item is Non-Cancellable and Non-Returnable.|Y
01|47120|2|1|Special Net Price|Y
01|47120|3|1|Special Net Price|Y
01|47124|1|1|Reference RGA# T-47672|Y
01|47124|1|2|5AX-130 s/n: 1864 Table will no repeat.|N
01|47124|3|1|Backlash has been adjusted.|Y
01|47124|3|2|Table tested with customer's parameters.|Y
01|47131|1|1|Special Net Price|Y
01|47131|1|2|Non-Cancelable & Non-Returnable|Y
01|47136|4|1|A5 Adapter Plate for HW-06-HS (H037M6)|Y
01|47142|1|1|*Non-returnable/ Non-Cancellable|Y
01|47145|33|1|*use with SK6 attachment|Y
01|47145|36|1|*Use with larger size attachments|Y
01|47165|1|1|Table with Motor.|Y
01|47165|4|1|Installation Includes: Drive amp bulkhead cable set|Y
01|47165|4|2|external cable sets communication cables parameter|Y
01|47165|4|3|changes travel and labor for installation of one|Y
01|47165|4|4|table on each pallet of Doosan VC 510 machine.|Y
01|47169|2|1|Installation: Dual axis drive unit short bar fiber|Y
01|47169|2|2|optic cable communications cables bulkhead cables|Y
01|47169|2|3|external cables parameter changes service time and|Y
01|47169|2|4|travel.|Y
01|47175|1|1|200MM table with installation kit.|Y
01|47175|1|2|Kit includes drive unit short bar fiber optic cable|Y
01|47175|1|3|communications cable bulkhead cables external cables.|Y
01|47175|2|1|Includes: Parameter changesservice time and travel.|Y
01|47180|1|1|Includes hydraulic pancake cylinder draw bar and nose|Y
01|47180|1|2|piece.|Y
01|47180|4|1|$1000.00 Face Value|Y
01|47186|1|1|Above pricing is for 1 - 5 pieces|Y
01|47186|2|1|Above pricing is for 6 - 11 pieces|Y
01|47186|3|1|Above pricing is for 12 + pieces|Y
01|47186|4|1|Above pricing is for any quantity|Y
01|47186|5|1|Above pricing is for any quantity|Y
01|47198|2|1|Installation: Drive unit short bar communications|Y
01|47198|2|2|cable fiber optic cable bulkhead cable external|Y
01|47198|2|3|cables service time and travel.|Y
01|47218|2|1|CNC-260OSP3-M (TABLE & MOTOR ONLY) SPECIAL PRICING|Y
01|47218|2|2|PACKAGE PRICE INCLUDES CNC-260OSP3-M EXTERNAL CABLES|Y
01|47218|2|3|CHUCK ADAPTER PLATE TAILSTOCK& 3 CAT50-NPU13 TOOLS|Y
01|47232|2|1|1-set = 3-pcs|Y
01|47232|3|1|HW-HJ-08-QC/Hard Jaws for H018M8/1 set = 3-pcs|Y
01|47232|4|1|PC-CHK-ADAPTER-SP/Special A2-8 adapter|Y
01|47232|5|1|PC-DRAWTUBE-SP/Special step down and honed drawtube|Y
01|47232|6|1|PC-DSCREW-THREAD/M50X1.5|Y
01|47235|2|1|CNC260OSP3-M WITH OSP3 MOTOR EXTERNAL CABLES|Y
01|47235|2|2|THIS TABLE FOR CONSIGNMENT AT KNIGHT ARMAMENT FOR TEST|Y
01|47235|2|3|TEST PERIOD FOR 90 DAYS|Y
01|47235|2|4|CONSIGNMENT PO REQUIRED|Y
01|47245|1|1|Only 1p Available in Factory (Japan)|Y
01|47245|2|1|Only (2p) Available in MX Office (Queretaro)|Y
01|47245|2|2|Special Discount|Y
01|47245|2|3|Minor Cosmetic Scratches|Y
01|47245|3|1|Only (2p) Available in MX Office (Queretaro)|Y
01|47245|3|2|Special Discount|Y
01|47245|3|3|Minor Cosmetic Scratches|Y
01|47252|1|1|This item is non-cancelable/non-returnable|Y
01|47258|28|1|ALL TOOLING IN TAPER PLUS NIKKEN TOOLING|Y
01|47258|28|2|COST MAY VARY WITH CONFIRMATION OF SHANK SIZES|Y
01|47258|28|3|THIS FOR COOLANT THRU COLLET/SYSTEM|Y
01|47258|28|4|TOOLING COMPATABLE WIT big plus SPINDLE|Y
01|47258|28|5|THESE ARE LIST PRICES/ TOOL CERTIFICATE AT 40% OFF|Y
01|47258|28|6|BASED UPON THIS LIST A $ 7500-$10000 CERTIFICATE|Y
01|47258|28|7|WOULD BE OK. THE COST OF $7500 CERT TO AO $ 4500.00|Y
01|47264|3|1|Free $1K value Tooling Certificate good for list price|Y
01|47264|3|2|tool holders.|Y
01|47264|5|1|16C Collet Closer - To be actuated by hydraulic|Y
01|47264|5|2|pancake cylinder|Y
01|47264|6|1|Manual Hand Valve for actuating 16C Collet Closer|Y
01|47267|1|1|Changing Disks Mfr Part# 6726157 3-5 9mm|Y
01|47267|2|1|Changing Disks Mfr Part# 6726143 6-12mm|Y
01|47267|3|1|Changing Disks Mfr Part# 6726144 12 1-22mm|Y
01|47267|4|1|Changing Disks Mfr Part# 6726145 22 1-32mm|Y
01|47271|1|1|Non-Cancelable & Non-Returnable|Y
01|47273|1|1|Axial Compensating Tap Collet .318 X .238|Y
01|47291|13|1|Retention Knob Promo applied!|Y
01|47293|1|1|Table with Okuma Motor|Y
01|47293|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|47293|2|2|holders.|Y
01|47293|3|1|Free Extended Warranty 1 Year (2 Years Total Warranty)|Y
01|47299|1|1|Special Net Price|Y
01|47302|6|1|NIKKEN NSVZ300 IS HIRTH COUPLING INDEXER|Y
01|47302|6|2|REQUIRES FULL 1 DEGREE INCREMENTS ONLY (360 TOTAL)|Y
01|47302|6|3|INDEX FUNCTION OR LADDER CHANGE NEEDED DUE TO HIRTH|Y
01|47302|6|4|COUPLING CANNOT IN BETWEEN FULL DEGREE INCREMENTS|Y
01|47302|6|5|INSTALLATION INCLUDES 4TH AXIS DRIVE CABLES CONNECTOR|Y
01|47302|6|6|BRAKE SYSTEM REQUIRES HYDRAULICS|Y
01|47313|27|1|Non-returnable and Non-cancellable|Y
01|47341|1|1|VDI30 5480 External Coolant ER20 or ER25 1:2 gear ratio|Y
01|47341|1|2|12000rpm max Ceramic coated spindles 10Nm TQ|Y
01|47341|1|3|-105 Degree Fixed Angle|Y
01|47341|2|1|VDI30 5480 External Coolant ER20 or ER25 1:2 gear ratio|Y
01|47341|2|2|12000rpm max Ceramic coated spindles 10Nm TQ|Y
01|47341|2|3|-110 Degree fixed angle|Y
01|47350|1|1|Special Net Price|Y
01|47353|1|1|Reference RGA# R-47835|Y
01|47356|2|1|This item is not a standard stock piece and therefore|Y
01|47356|2|2|considered a Special. Once an order is placed with|Y
01|47356|2|3|factory it may not be canceled or returned.|Y
01|47358|1|1|Reference RGA# R-47825|Y
01|47358|1|2|3x B5005-1375-7.68 2 repairable & 1 unrepairable.|N
01|47358|4|1|Labor charges for the evaluation of 3x B5005-1375-7.68|Y
01|47358|4|2|and the disassemby cleaning and re-greasing of two|Y
01|47358|4|3|units third unit is unrepairable.|Y
01|47359|2|1|45% off with purchase of a matching holder|Y
01|47364|1|1|Reference RGA# R-47813|Y
01|47364|1|2|CAT50U-NX5-151|N
01|47382|3|1|HMS-8.695-OH  Nikken Carbide Mill Reamer Through Hole|Y
01|47403|1|1|Reference RGA# R-47834|Y
01|47403|1|2|C5005-0875-5.66|N
01|47404|10|1|We have just 1 piece in stock for this item.|Y
01|47412|1|1|Net Price Each|Y
01|47412|2|1|Net Price Each|Y
01|47412|3|1|Net Price Each|Y
01|47412|4|1|Net Price Each|Y
01|47412|5|1|Net Price Each|Y
01|47412|6|1|Net Price Each|Y
01|47412|7|1|Net Price Each|Y
01|47412|8|1|Net Price Each|Y
01|47412|10|1|Net Price Each|Y
01|47412|12|1|Net Price Each|Y
01|47412|13|1|Net Price Each|Y
01|47445|33|1|*use with SK6 attachment|Y
01|47445|36|1|*Use with larger size attachments|Y
01|47450|1|1|Non-Cancelable & Non-Returnable|Y
01|47461|1|1|Reference RGA# R-47829|Y
01|47461|1|2|OKU-LB35-Z/OKLB35-ER50Z sn: AL0003|N
01|47461|4|1|Spindle shaft is damaged and must be replaced.|Y
01|47461|4|2|Collet nut bearings seals and o-rings are damaged/|Y
01|47461|4|3|worn and must be replaced. Labor is included.|Y
01|47465|1|1|for 6 Ingersoll face mill|Y
01|47465|2|1|for 3 Ingersoll face mill|Y
01|47465|33|1|*example of pricing for 180DA collet|Y
01|47465|47|1|*only available with 6.30 gl|Y
01|47468|3|1|Quoted as a net price.|Y
01|47495|2|1|1pc 5$ Knob per holder purchased|Y
01|47498|1|1|Reference RGA# R-45358|Y
01|47498|1|2|C40FHM-ER20-198C s/n: 475001|N
01|47498|3|1|Bearings seals and o-rings are worn and must be|Y
01|47498|3|2|replaced. Labor is included.|Y
01|47500|1|1|Non-Cancelable & Non-Returnable|Y
01|47522|6|1|INSTALLATION INCLUDE ADITIONAL AMP CABLES CONNECTORS|Y
01|47522|6|2|PARAMETER TRAVEL LABOR FULL 4TH AXIS INTERFACE|Y
01|47534|1|1|***Alpha2i Motor and Gearbox***|Y
01|47534|2|1|***MT#3 Center Sockets***|Y
01|47534|5|1|Install on Mori DV5100|Y
01|47534|6|1|Free $4K Tooling Certificate good for list price tool|Y
01|47534|6|2|holders - Per Chris Blaine|Y
01|47534|8|1|Additional Tooling Certificate good for $6K List Price|Y
01|47534|8|2|value.|Y
01|47546|1|1|Non-Cancelable & Non-Returnable|Y
01|47546|2|1|Non-Cancelable & Non-Returnable|Y
01|47552|4|1|List price reflects Shrink Fit Package|Y
01|47552|4|2|1 HSK63A Shrink Fit Unit & 10 HSK63A SF Holders|Y
01|47558|1|1|X-Axis Straight-Offset Unit HydroFlex output 20mm|Y
01|47558|2|1|Clamping Sleeve/Chuck|Y
01|47558|3|1|Z-Axis 90 deg Unit HydroFlex output 20mm|Y
01|47558|4|1|Clamping sleeve/Chuck|Y
01|47563|3|1|NBT30-MDSK13-60|Y
01|47563|10|1|SK13-8A Nikken Collet|Y
01|47563|11|1|MDSKN-13BJ  High Speed Coolant Nut|Y
01|47600|1|1|4-Hole Burn|Y
01|47600|1|2|Price reflects Net charge for DIN modification|Y
01|47604|1|1|Item Quoted at a Net Price|Y
01|47623|1|1|Reference RGA# T-47611|Y
01|47623|1|2|5AX-151ZA s/n: NA - Table is worn sent in for eval.|N
01|47623|5|1|Replacing needed bearings seals and o-rings for both|Y
01|47623|5|2|rotary and tilt axis.|Y
01|47623|6|1|Brake parts for both rotary and tilt axis must be|Y
01|47623|6|2|replaced.|Y
01|47623|7|1|Tilt axis worm wheel and worm screw are worn|Y
01|47623|7|2|and must be replaced.|Y
01|47623|8|1|Rotary axis worm wheel and worm screw are worn|Y
01|47623|8|2|and must be replaced.|Y
01|47634|1|1|Mimatic 172319 for E-Mag|Y
01|47634|1|2|Quoted 1-pc net price|Y
01|47634|2|1|Mimatic 172319 for E-Mag|Y
01|47634|2|2|Quoted 2-pc net price|Y
01|47635|3|1|C40-TESTBAR-10.00-SP CAT40 Testbar 1.25 diam 10 GL|Y
01|47635|4|1|C40-TESTBAR-10.00-SP CAT40 Testbar 1.25 diam 10 GL|Y
01|47635|5|1|C40-TESTBAR-10.00-SP CAT40 Testbar 1.25 diam 10 GL|Y
01|47635|6|1|C50-TESTBAR-10.00-SP CAT50 Testbar 1.25 diam 10 GL|Y
01|47635|7|1|C50-TESTBAR-10.00-SP CAT50 Testbar 1.25 diam 10 GL|Y
01|47635|8|1|C50-TESTBAR-10.00-SP CAT50 Testbar 1.25 diam 10 GL|Y
01|47639|1|1|Includes table independent control unit and pendant.|Y
01|47639|2|1|Installation Includes - Service Engineer travel to|Y
01|47639|2|2|Maxon to assist with installation of CNC260AA21 on a|Y
01|47639|2|3|machine that currently has a independent controlled|Y
01|47639|2|4|table.|Y
01|47640|8|1|Installation includes:Dual axis drive unit fiber optic|Y
01|47640|8|2|cables communications cables bulkhead cables|Y
01|47640|8|3|external cables I.O module  axis expansion card|Y
01|47640|8|4|parameter changes service time and travel.|Y
01|47640|10|1|manual 50 taper fixture will fit on both tables|Y
01|47644|1|1|Option #1 (7.087 Diameter Faceplate)|Y
01|47644|4|1|Includes: drive amp bulk head cable set external|Y
01|47644|4|2|cable set fiber optic cable communication cable|Y
01|47644|4|3|travel and labor for installation.|Y
01|47644|4|4|For doosan DNM400II  w/Fanuc OIMD control|Y
01|47654|2|1|Please Note: customer will not be able to use a back-up|Y
01|47654|2|2|with this holder.|Y
01|47654|2|3|***NET PRICE- NO DISC TO APPLY TO MODIFICATIONS***|Y
01|47654|6|1|Please Note: customer will not be able to use a back-up|Y
01|47654|6|2|with this DIN holder.|Y
01|47654|12|1|***NET PRICE- NO DISC TO APPLY TO MODIFICATIONS***|Y
01|47671|1|1|for 6 Ingersoll face mill|Y
01|47671|2|1|for 3 Ingersoll face mill|Y
01|47671|33|1|*example of pricing for 180DA collet|Y
01|47671|47|1|*only available with 6.30 gl|Y
01|47685|1|1|Net Price Each|Y
01|47685|1|2|With SKN-16BJ (20p)|Y
01|47685|1|3|Non-Cancelable & Non-Returnable|Y
01|47700|1|1|Holder comes with needed wrench|Y
01|47733|2|1|8 NIKKEN TILT TABLE WITH YASNAC MOTORS|Y
01|47733|2|2|MOTORS WILL BE INSTALLED BY LYNDEX NIKKEN|Y
01|47733|2|3|ROTARY & TILT AXIS EXRTERNAL CABLES INCLUDED|Y
01|47733|2|4|LYNDEX NIKKEN TO PROVIDE PARAMETERS AS NEEDED|Y
01|47733|2|5|****CONFIRMATION OF FIT AND ORIENTATION ON MACHINE|Y
01|47733|2|6|TO BE DISCUSSED!!!!!!|Y
01|47733|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|47733|10|1|manual 50 taper fixture/RECEIVER|Y
01|47736|4|1|Includes: Bulk head cable set External cables set|Y
01|47736|4|2|parameter changes service time & travel|Y
01|47736|4|3|For Doosan DNM500l|Y
01|47737|2|1|Hydraulic Clamping required|Y
01|47737|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|47737|10|1|manual 50 taper fixture/RECEIVER|Y
01|47745|2|1|Hydraulic Clamping required|Y
01|47745|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|47745|10|1|manual 50 taper fixture/RECEIVER|Y
01|47761|2|1|Installation: Drive unitshort barfiber optic cable|Y
01|47761|2|2|communications cablebulkhead cable set external cable|Y
01|47761|2|3|setparameter changes service time and travel.|Y
01|47772|4|1|subplate for PBA-135 TO MATCH CNC-180-2W-250|Y
01|47772|6|1|MANUAL TAILSTOCK W/WHEEL|Y
01|47772|8|1|SUBPLATE FOR MANUAL TAILSTOCK TO MACH CNC-180-2W-250|Y
01|47786|5|1|Need to confirm cable length|Y
01|47786|5|2|4 complete sets 3-4 weeks ARO|Y
01|47817|2|1|External Cable Set for Rotary and Tilt Axis|Y
01|47831|1|1|NBT30-MDPE20-75|Y
01|47831|3|1|AOMT123608PEER-M VP15F|Y
01|47831|4|1|TPS-25|Y
01|47831|5|1|TIP07F|Y
01|47831|6|1|NBT30-MDPE25-80|Y
01|47831|8|1|AOMT184808PEER-M VP15F|Y
01|47831|9|1|TPS-4|Y
01|47831|10|1|TIP15W|Y
01|47832|1|1|B/O ETA 4/8/16|Y
01|47837|1|1|Reference RGA# R-47857|Y
01|47837|1|2|MZQT47-ER25X-OFF-HS s/n: 5198104|N
01|47837|3|1|Bearings seals and o-rings are worn and must be|Y
01|47837|3|2|replaced. Labor is included.|Y
01|47841|1|1|Reference RGA# Q-47795|Y
01|47841|1|2|OKL3-ER32X-C-7MP-MIM s/n: 39793 01|N
01|47841|4|1|Bearings seals and o-rings must be replaced. Spindles|Y
01|47841|4|2|must be resurfaced. Labor is included.|Y
01|47842|1|1|Tooling Certificate Number:13679-752-030316|Y
01|47852|1|1|Reference RGA# R-47851|Y
01|47852|1|2|Nikken Micro Touch|N
01|47852|4|1|Batteries must be replaced.|Y
01|47858|1|1|Non-returnable and non-cancellable|Y
01|47860|1|1|Non-Returnable Non-Cancelable|Y
01|47860|1|2|Quoting at Net price only|Y
01|47867|1|1|Non-Retunable Non-Cancelable|Y
01|47871|3|1|Wrench 100% discount per terms of puchasing all|Y
01|47871|3|2|items as quoted|Y
01|47877|1|1|Reference RGA# T-47726|Y
01|47877|1|2|5AX-2MT-105-120FA s/n: 8215|N
01|47883|1|1|Reference RGA# T-47824|Y
01|47883|1|2|5AX-2002 s/n: 2154|N
01|47900|8|1|*not available in 1|Y
01|47909|1|1|To be Coolant Port Modified|Y
01|47909|2|1|Coolant Port Modification of above C5006-1000-4.00|Y
01|47909|3|1|To be Coolant Port Modified|Y
01|47909|4|1|Coolant Port Modification of above C5016-0375-4.00|Y
01|47912|1|1|Non-Cancelable & Non-Returnable|Y
01|47912|2|1|Non-Cancelable & Non-Returnable|Y
01|47912|3|1|Non-Cancelable & Non-Returnable|Y
01|47912|4|1|Non-Cancelable & Non-Returnable|Y
01|47912|5|1|Non-Cancelable & Non-Returnable|Y
01|47912|6|1|Non-Cancelable & Non-Returnable|Y
01|47928|1|1|TWIN SPINDLE TABLE W/MELDAS MOTORS (NOT FANUC)|Y
01|47928|11|1|FULL 4TH AXIS INSTALLATION ON HARDINGE V1000|Y
01|47928|11|2|PLEASE CONFIRM CORRECT CABLES|Y
01|47947|1|1|Installation for RFID Chip BIS0030W supplied by|Y
01|47947|1|2|Lyndex-Nikken and holders to be re-balanced after|Y
01|47947|1|3|installation of chip.  Quoted 1 to 4 holders.|Y
01|47947|3|1|Installation for RFID Chip BIS0030W supplied by|Y
01|47947|3|2|Lyndex-Nikken and holders to be re-balanced after|Y
01|47947|3|3|installation of chip.  Quoted 5 to 9 holders.|Y
01|47947|5|1|Installation for RFID Chip BIS0030W supplied by|Y
01|47947|5|2|Lyndex-Nikken and holders to be re-balanced after|Y
01|47947|5|3|installation of chip.  Quoted 10 to 20 holders|Y
01|47947|7|1|Installation for RFID Chip BIS0030W supplied by|Y
01|47947|7|2|Lyndex-Nikken and holders to be re-balanced after|Y
01|47947|7|3|installation of chip.  Quoted 21+ holders.|Y
01|47967|3|1|*Qty Break Pricing|Y
01|47968|4|1|Special cables with VX1000 pin out|Y
01|47968|5|1|Special cables with VX1000 pin out|Y
01|47979|1|1|NC5016-0375-4.00|Y
01|47979|2|1|NC5036-0375-8.00|Y
01|47979|4|1|NC5036-0500-8.00|Y
01|47980|1|1|C50FHM-ER25-195-110TP non-coolant CAT50 ER25 Flex Head|Y
01|47980|1|2|This item is a non standard item and considered a|Y
01|47980|1|3|Special. Once a PO is placed with factory it may not|Y
01|47980|1|4|be cancelled or returned.|Y
01|47980|2|1|Custom Positioning Block manufactured by Lyndex-Nikken|Y
01|47980|2|2|Tech Dept utilizing specs provided by End User.|Y
01|47981|1|1|NC5016-0375-4.00|Y
01|47981|2|1|NC5036-0375-8.00|Y
01|47981|4|1|NC5036-0500-8.00|Y
01|47984|1|1|Non-Cancelable & Non-Returnable|Y
01|47984|2|1|Non-Cancelable & Non-Returnable|Y
01|47984|3|1|Non-Cancelable & Non-Returnable|Y
01|47984|4|1|Non-Cancelable & Non-Returnable|Y
01|47984|5|1|Non-Cancelable & Non-Returnable|Y
01|47984|6|1|Non-Cancelable & Non-Returnable|Y
01|47986|1|1|Non-Cancelable & Non-Returnable|Y
01|47986|2|1|Non-Cancelable & Non-Returnable|Y
01|47986|3|1|Non-Cancelable & Non-Returnable|Y
01|47986|4|1|Non-Cancelable & Non-Returnable|Y
01|47986|5|1|Non-Cancelable & Non-Returnable|Y
01|47986|6|1|Non-Cancelable & Non-Returnable|Y
01|47996|1|1|HSK100A-FMH31.75-76-150|Y
01|47996|1|2|Quoted Net 1 to 7 pieces|Y
01|47996|2|1|HSK100A-FMH31.75-76-150|Y
01|47996|2|2|Quoted Net 8 to 15 pieces|Y
01|47996|4|1|HSK100A-FMH31.75-76-200|Y
01|47996|4|2|Quoted net 1 to 7 pieces|Y
01|47996|5|1|HSK100A-FMH31.75-76-200|Y
01|47996|5|2|Quoted net 8 to 15 pieces|Y
01|48001|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|48001|4|2|holders.|Y
01|48013|1|1|Non-Cancelable & Non-Returnable|Y
01|48013|2|1|Non-Cancelable & Non-Returnable|Y
01|48018|2|1|Quoted as net price|Y
01|48023|2|1|M55x2 Threading to match draw tube on HW-06-KS|Y
01|48023|3|1|JFB-2703 Customer Extended Draw Screw -Nut (M90x2)|Y
01|48033|7|1|TESTRING-2.00|Y
01|48033|8|1|TESTRING-2.00|Y
01|48033|9|1|TESTRING-2.00|Y
01|48035|1|1|Reference RGA# T-47816|Y
01|48035|1|2|5AX-201FA s/n: 4298|Y
01|48043|2|1|Hydraulic Clamping required|Y
01|48043|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|48043|10|1|manual 50 taper fixture/RECEIVER|Y
01|48044|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|48044|10|1|manual 50 taper fixture/RECEIVER|Y
01|48045|1|1|Table with Fanuc motors|Y
01|48045|2|1|External cables - Power/Signal and Feedback for both|Y
01|48045|2|2|axis (4 cables total).|Y
01|48045|3|1|Manual 5C Collet Closer - Dead Length|Y
01|48059|1|1|Reference RGA# R-47861|Y
01|48059|1|2|NCAT50-C3/4-105U|N
01|48063|1|1|Reference RGA# R-47877|Y
01|48063|1|2|CAT40U-NX5-153|N
01|48063|11|1|Spindle shaft has grooves and must be resurfaced.|Y
01|48063|11|2|Modification will be completed in 2-3 weeks.|Y
01|48090|1|1|Reference RGA# T-47854|Y
01|48090|1|2|CNC302 s/n: 7652|N
01|48090|33|1|External Cable for CNC302|Y
01|48099|3|1|This line at no charge as a courtesy to the customer|Y
01|48104|2|1|Lyndex-Nikken to make custom block upon receipt of|Y
01|48104|2|2|machine/model spindle information|Y
01|48118|1|1|Reference RGA# T-47854|Y
01|48118|1|2|CNC260 s/n: 5657H|N
01|48125|8|1|*not available in 1|Y
01|48133|1|1|Reference RGA# R-47874|Y
01|48133|1|2|TAT-250 s/n: 2468|N
01|48135|11|1|INCLUDES SERVO MOTOR AMPLIFIER WIRE HARNESS ALL|Y
01|48135|11|2|CONNECTORS LABOR TRAVLE|Y
01|48152|1|1|Reference RGA# T-47874|Y
01|48152|1|2|TAT-250 s/n: 2126|N
01|48153|1|1|CNC180 CORE REPLACEMENT SERIAL#8830 TABLE TO STAY AT|Y
01|48153|1|2|LYNDEX-NIKKEN.|Y
01|48166|1|1|Reference RGA# R-47833|Y
01|48166|1|2|3x HP-6|N
01|48169|1|1|Reference RGA# T-47860|Y
01|48169|1|2|CNC401OSP2 s/n: 8924|N
01|48170|1|1|Reference RGA# T-47854|Y
01|48170|1|2|CNC260 s/n: 6283H|N
01|48172|1|1|Okuma LU45 VDI60 45-Deg Fixed Angle Live Tool|Y
01|48172|1|2|Net price reflects purchase of 1 tool.|Y
01|48172|3|1|Okuma LU45 VDI60 45-Deg Fixed Angle Live Tool|Y
01|48172|3|2|Net price reflects purchase of 2 tools.|Y
01|48173|4|1|Same style cover as KS-CN200R-MA but 10mm longer|Y
01|48173|4|2|Have in stock currently.|Y
01|48176|1|1|Quoted at a net price.|Y
01|48179|1|1|Okuma LU45 VDI60 45-Deg Fixed Angle Live Tool|Y
01|48179|1|2|Net price reflects purchase of 1 tool.|Y
01|48179|3|1|Okuma LU45 VDI60 45-Deg Fixed Angle Live Tool|Y
01|48179|3|2|Net price reflects purchase of 2 tools.|Y
01|48195|1|1|Special Net Price|Y
01|48195|1|2|Non-Cancelable & Non-Returnable|Y
01|48195|2|1|Special Net Price|Y
01|48207|3|1|Installation: Bulkhead cable set external cable set|Y
01|48207|3|2|parameter changes service time and travel.|Y
01|48207|3|3|Utilizing existing DDR drive unit.|Y
01|48207|6|1|500psi hydraulic pump with pressure switch and solenoid|Y
01|48207|6|2|hoses with quick disconnect to be used by table and|Y
01|48207|6|3|support table.|Y
01|48233|1|1|Z-axis 90 Deg ER25 Miyano Live Tool|Y
01|48233|2|1|Z-Axis 90 Deg ER25 Miyano Live Tool|Y
01|48233|3|1|Z-axis 90 Deg ER25 Miyano Live Tool|Y
01|48233|5|1|Z-Axis 90 Deg ER20 Miyano Live Tool|Y
01|48233|6|1|Z-Axis 90 Deg ER20 Miyano Live Tool|Y
01|48233|7|1|Z-Axis 90 Deg ER20 Miyano Live Tool|Y
01|48241|1|1|Quoted at a net price|Y
01|48247|1|1|Machine must have 4th axis installed|Y
01|48247|1|2|please confirm if Vertical/horizontal use or both|Y
01|48247|1|3|This to determin external connectors|Y
01|48247|1|4|Will need to confirm machine drive (motor compatability|Y
01|48247|1|5|Will need wiring info if ordered|Y
01|48247|9|1|confirmation of cable length&P?N|Y
01|48258|1|1|Option #1|Y
01|48258|2|1|Installation Includes: drive amp bulk head cable set|Y
01|48258|2|2|external cable set communication cables travel and|Y
01|48258|2|3|labor for installation of one table on one machine.|Y
01|48261|5|1|Custom Cylinder Assembly|Y
01|48261|5|2|Includes Draw Tube/Chuck Adapter Plate/Cylinder Adapter|Y
01|48269|5|1|installed w/ PS-N63AE at factory|Y
01|48269|13|1|installed w/ PS-N63AE at factory|Y
01|48269|18|1|installed w/ PS-N63AE at factory|Y
01|48269|25|1|*Pricing of NC5 holders includes installed Pull Studs|Y
01|48269|25|2|on NC5 holders above|Y
01|48269|25|3|This item is Non-Cancellable and Non-Returnable|Y
01|48274|1|1|Reference RGA# T-47700|Y
01|48274|1|2|CNC180FA s/n: 8830|N
01|48277|1|1|Qty Break Pricing 1-2pcs|Y
01|48277|3|1|Qty Break Pricing 3pcs|Y
01|48277|5|1|Qty Break Pricing 4-5pcs|Y
01|48281|1|1|Table with Fanuc Motors - Hydraulic Brakes|Y
01|48281|2|1|500 psi unit and quick disconnect hoses for table brake|Y
01|48281|2|2|systems.|Y
01|48281|3|1|Installation Includes: Fanuc Parts Labor & Travel.|Y
01|48281|3|2|Machine must have 5th axis option on prior to install|Y
01|48281|3|4|NV5000. (Pricing reflects discounting for usable|N
01|48281|3|5|components of existing interface as well as discounted|N
01|48281|3|6|travel charge because of doing multiple machines on one|N
01|48281|3|7|visit.)|N
01|48282|2|1|500 psi unit and quick disconnect hoses for table brake|Y
01|48282|2|2|systems.|Y
01|48282|3|1|Installation Includes: Fanuc parts Labor & travel|Y
01|48282|3|2|Machine must have 5th axis option on prior to install|Y
01|48282|3|3|and Labor for installation of one 5AX table on one Mori|N
01|48282|3|4|NV5000. (Pricing reflects discounting for usable|N
01|48282|3|5|components of existing interface as well as discounted|N
01|48282|3|6|travel charge because of doing multiple machines on one|N
01|48282|3|7|visit.)|N
01|48283|1|1|Mazak Spec:  No motor.  Require hydraulic for clamp|Y
01|48283|3|1|Hydraulic pump is optional for clamp of rotary & suppor|Y
01|48310|12|1|This line at no charge as a courtesy to the customer|Y
01|48310|14|1|This line at no charge as a courtesy to the customer|Y
01|48310|16|1|This line at no charge as a courtesy to the customer|Y
01|48310|20|1|This line at no charge as a courtesy to the customer|Y
01|48336|1|1|Non-Cancelable & Non-Returnable|Y
01|48336|2|1|Non-Cancelable & Non-Returnable|Y
01|48339|1|1|Brother Speedio|Y
01|48345|1|1|6pcs in stock in IL 5pcs ETA 4/29 balance late June|Y
01|48345|2|1|ETA for all 4pcs pending from factory|Y
01|48358|1|1|Reference RGA# T-47191|Y
01|48358|1|2|CNC250FA s/n: 2961|N
01|48375|1|1|INCLUDES 7CHUCK ADAPTER PLATE MANUAL TAILSTOCK|Y
01|48375|1|2|ANDCAT 40 TOOL PACKAGE|Y
01|48375|3|1|INSTALLATION INCLUDES 4TH AXIS DRICE CABLES INTERNA|Y
01|48375|3|2|AND EXTERNAL CONNECTORS LABOR TRAVEL|Y
01|48396|1|1|DELIVERY = 1P STOCK 5P PENDING|Y
01|48396|2|1|DELIVERY= 6P PENDING|Y
01|48396|3|1|DELIVERY= 2P STOCK 10P PENDING|Y
01|48436|2|1|Price includes Chip BIS003W installed and holders|Y
01|48436|2|2|re-balanced.Lyndex-Nikken will supply chip.|Y
01|48436|5|1|Price includes Chip BIS003W installed and holders|Y
01|48436|5|2|re-balanced.Lyndex-Nikken will supply chip.|Y
01|48456|1|1|The unit pricing is for TWO tables and all needed|Y
01|48456|1|2|components for ONE machine.|Y
01|48456|1|3|Total of 3 R650X1 machines and 6 CNCZ100-4W tables.|Y
01|48463|2|1|Delivery is 1-2 days after PO|Y
01|48483|4|1|To be  used to hold 9.7mm Tap|Y
01|48483|10|1|Shell Mill Arbor Bolt|Y
01|48504|1|1|*slow moving stock- additional disc applied|Y
01|48504|10|1|*slow moving stock- additional disc applied|Y
01|48521|2|1|HSK100A-SM1000-9.00|Y
01|48529|5|1|Custom Cylinder Assembly|Y
01|48529|5|2|Includes Draw Tube/Chuck Adapter Plate/Cylinder Adapter|Y
01|48541|1|1|86677 UMCC1250-10|Y
01|48541|2|1|86678  UMCC1250-12|Y
01|48541|3|1|86679  UMCC1250-14|Y
01|48541|4|1|86821  UMCC1250-16|Y
01|48541|5|1|86980  UMCC1250-20|Y
01|48541|6|1|86982  UMCC1250-25|Y
01|48541|7|1|86650  UMCC1250-032|Y
01|48541|8|1|86653  UMCC1250-040|Y
01|48541|9|1|86654  UMCC1250-048|Y
01|48541|10|1|86656  UMCC1250-064|Y
01|48541|11|1|87378  UMCC1250-10(C)|Y
01|48541|12|1|87379  UMCC1250-12(C)|Y
01|48541|13|1|87380  UMCC1250-14(C)|Y
01|48541|14|1|87386  UMCC1250-16(C)|Y
01|48541|15|1|87394  UMCC1250-20(C)|Y
01|48541|16|1|87470  UMCC1250-25(C)|Y
01|48541|17|1|87200  UMCC1250-032(C)|Y
01|48541|18|1|87218  UMCC1250-040(C)|Y
01|48541|19|1|87220  UMCC1250-048(C)|Y
01|48541|20|1|87230  UMCC1250-064(C)|Y
01|48541|21|1|21675  CV50-UMC6.50-1250|Y
01|48541|22|1|92982  UMCC1250-SPAN|Y
01|48541|23|1|88319  UMCC1250N-10(C)|Y
01|48541|24|1|88320  UMCC1250N-12(C)|Y
01|48541|25|1|88330  UMCC1250N-14(C)|Y
01|48541|26|1|88340  UMCC1250N-16(C)|Y
01|48541|27|1|88350  UMCC1250N-20(C)|Y
01|48541|28|1|88360  UMCC1250N-25(C)|Y
01|48541|29|1|88234  UMCC1250N-032(C)|Y
01|48541|30|1|88254  UMCC1250N-040(C)|Y
01|48541|31|1|88257  UMCC1250N-048(C)|Y
01|48541|32|1|88260  UMC1250N-064(C)|Y
01|48558|1|1|****Cable connections to table must be moved to inside|Y
01|48558|1|2|of the trunnion/motor covers.****|Y
01|48586|1|1|UNV # 62|Y
01|48599|1|1|To be DIN modified before shipping|Y
01|48599|2|1|DIN modification of C5006-25-4.00|Y
01|48599|3|1|To be DIN modified before shipping|Y
01|48599|4|1|DIN modification of C5006-32-4.00|Y
01|48612|1|1|Reference RGA# T-47903|Y
01|48612|1|2|CNC202LFA s/n: 7085A|N
01|48619|2|1|*Balance to G2.5 @ 10000 RPM|Y
01|48619|2|2|*Balance collet chuck only not whole assembly|Y
01|48619|8|1|*Balance to G2.5 @ 10000 RPM|Y
01|48619|8|2|*Balance collet chuck only not whole assembly|Y
01|48619|11|1|*Balance to G2.5 @ 10000 RPM|Y
01|48619|11|2|*Balance end mill holder only not whole assembly|Y
01|48638|1|1|2pcs in stock 10 pcs ETA 4/15 remaining ETA pending|Y
01|48639|1|1|1 CNCZ-260LSA-BR2 ALREADY AT YAMAZEN GA. OFFICE ON|Y
01|48639|1|2|BROTHER S1000X MACHINE FROM EASTEC SHOW (WITH CHUCK)|Y
01|48639|1|3|CHUCK WILL BE NINCLUDED AT NO CHARGE|Y
01|48641|1|1|Reference RGA# R-47911|Y
01|48641|1|2|CAT40-UMT200U|N
01|48647|1|1|This table to be configure with Fanuc Alpha 8 motor|Y
01|48647|1|2|Lyndex Nikken to work with Matsuura to confirm drive|Y
01|48647|1|3|and wiring connectors parameters.|Y
01|48647|1|4|table is stock delivery once we get wiring from builde|Y
01|48657|1|1|1pc in stock 1pc aprox 9 weeks|Y
01|48657|1|2|OKL4-ER40X non ccolant version is in stock in case they|Y
01|48657|1|3|don't need both to be coolant type.|Y
01|48664|2|1|Modififcation to Din CAT40-C1-85 quoted as net price|Y
01|48664|2|2|Once a purchase order is placed it cannot be cancelled|Y
01|48664|2|3|or returned.|Y
01|48672|5|1|Price includes Balluf Chip #BIS0011 hole being cut in|Y
01|48672|5|2|at Lyndex-Nikken before shipping. End User to install|Y
01|48672|5|3|chips themselves.|Y
01|48672|6|1|Only 1pc available at factory any balance over will be|Y
01|48672|6|2|aprox 13 weeks for delivery.|Y
01|48672|6|3|Price includes Balluf Chip #BIS0011 hole being cut in|Y
01|48672|6|4|at Lyndex-Nikken before shipping. End User to install|Y
01|48672|6|5|chips themselves.|Y
01|48672|11|1|7 in stock at Nikken|N
01|48691|7|1|To be installed on SK16C holder here prior to shipping|Y
01|48691|7|2|Price built into cost of holders already.|Y
01|48691|8|1|NBT30-SK16C-60P-J to be modified to Coolant b4 shipping|Y
01|48691|9|1|NBT30-SK16C-90P-J to be modified to Coolant b4 shipping|Y
01|48691|22|1|ETA 1-2 weeks ARO|Y
01|48691|23|1|NBT30-SK10C-75P-J to be modified to Coolant b4 shipping|Y
01|48691|24|1|To be installed on SK10C holder here prior to shipping|Y
01|48691|24|2|Price built into cost of holders already.|Y
01|48691|26|1|NBT30-SK10C-75P-J to be modified to Coolant b4 shipping|Y
01|48691|27|1|NBT30-SK10C-90P-J to be modified to Coolant b4 shipping|Y
01|48695|1|1|EXTERNAL CABLES OSP SERVO MOTOR CONNECTORS INCLUDED|Y
01|48721|1|1|HSK125A-C1.1/4-101.6= C1.1/4 4GL|Y
01|48721|2|1|HSK125A-C1.1/4-165.1=C1.1/4 6.5 GL|Y
01|48721|3|1|HSK125A-C1.1/4-247.65=C1.1/4 9.75GL|Y
01|48721|4|1|HSK125A-C1.1/4-133.35=C1.1/4 5.25 GL|Y
01|48721|6|1|HSK125A-ER32-6.50 =ER32 6.5 GL|Y
01|48723|1|1|T00117 Toolholder 1 OD|Y
01|48723|1|2|Net price quoted.|Y
01|48731|1|1|Table with motor|Y
01|48731|3|1|Installation Includes: drive amp bulk head cable set|Y
01|48731|3|2|external cable set communication cable parameter|Y
01|48731|3|3|changes travel and labor for one CNC321FA-M on Doosan|Y
01|48731|3|4|MYNX 5400 VMC.|Y
01|48731|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|48731|4|2|holders.|Y
01|48769|1|1|Reference RGA# R-47880|Y
01|48769|1|2|OK101-13000 s/n: AL714|N
01|48769|3|1|Broken bolt is stuck in spindle causing damage. Spindle|Y
01|48769|3|2|shaft must be replaced. Bearings seals and o-rings|Y
01|48769|3|3|must also be replaced. Labor is included.|Y
01|48781|1|1|Reference RGA# R-47901|Y
01|48781|1|2|T32216B02 s/n: A0801|N
01|48781|3|1|Gears and collet nut are damaged and must be replaced.|Y
01|48781|3|2|Bearings seals and o-rings are worn and must be|Y
01|48781|3|3|replaced. Labor is included.|Y
01|48781|5|1|T32114B02 s/n: A0696|N
01|48781|7|1|Collet nut bearings seals and o-rings are worn and|Y
01|48781|7|2|must be replaced. Labor is included.|Y
01|48783|1|1|Table with motor|Y
01|48783|2|1|Booster for hydraulic brake|Y
01|48783|3|1|Installation Includes: Drive amp bulk head cable set|Y
01|48783|3|2|external cable set communication cable parameter|Y
01|48783|3|3|changes travel and labor for installation of one|Y
01|48783|3|4|CNC321FA-M on one Toyoda Stealth 1165 VMC.|Y
01|48794|1|1|Qty Break Pricing 17-20pcs|Y
01|48794|4|1|Qty Break Pricing 21-45pcs|Y
01|48800|5|1|*pre-balanced and balanceable feature|Y
01|48800|6|1|*pre-balanced and balanceable feature|Y
01|48800|14|1|*wrench for above collet chucks|Y
01|48800|16|1|*pre-balanced and balanceable feature|Y
01|48800|19|1|*pre-balanced and balanceable feature|Y
01|48800|20|1|*pre-balanced and balanceable feature|Y
01|48800|21|1|*pre-balanced and balanceable feature|Y
01|48800|38|1|*pre-balanced and balanceable feature|Y
01|48800|51|1|.429 x .322  only available in System #2|Y
01|48800|51|2|Need to use with C40R5-0875-3.66|Y
01|48805|4|1|Tailstock with MT-#3 socket without live center.|Y
01|48805|6|1|Atlas Dead length self contained 5C collet closer.|Y
01|48805|6|2|Hand lever included.|Y
01|48808|1|1|MT-230: Brass Nut|Y
01|48813|1|1|180MM twin spindle table without motor.|Y
01|48814|1|1|Reference RGA# R-47925|Y
01|48814|1|2|CAT50-MMC8C-105U|N
01|48814|4|1|Minimum laobr charge is $110.00/hour. Due to this tool|Y
01|48814|4|2|only needing screw loosened and a clean up $25.00|Y
01|48814|4|3|labor charge will be assessed.|Y
01|48815|5|1|Price noted is NET on positioning block|Y
01|48830|4|1|Custom Positioning Block to be built by Lyndex-Nikken|Y
01|48830|4|2|based on specs provided by End User.|Y
01|48842|2|1|Custom Positioning Block mfg by Lyndex-Nikken per end|Y
01|48842|2|2|user provided specifications|Y
01|48844|1|1|Reference RGA# T-47441|Y
01|48844|1|2|5AX-2002 s/n: 2067|N
01|48874|1|1|Special Closed Pilot Bushing (#2) for H3KB12 Chuck.|Y
01|48879|1|1|Nikken CNC-401 Table with OSP Motor|Y
01|48879|1|2|Includes Air/hyd booster for Table brake to be used in|Y
01|48879|1|3|vertical position|Y
01|48879|1|4|I table to be used in both horizontal and Vertical|Y
01|48879|1|5|then Hydraulic unit needs to be used and quoted|Y
01|48879|3|1|4 Jaw Indepent chuck (12) with adapter plate for|Y
01|48879|3|2|Nikken CNC-401OSP3 Rotary Table|Y
01|48879|5|1|STAND ALONE HYD UNIT FOR BRAKE ON ROTARY|Y
01|48879|5|2|ONLY NEEDED IF TABLE TO BE USED VERTICAL AND HORIZONTAL|Y
01|48886|2|1|Please verify shank and square dimensions with customer|Y
01|48888|3|1|Quoted as alternative for NBT40-MDSK10=75|Y
01|48888|6|1|Quoted as alternative for SK10-6A|Y
01|48892|1|1|Special Discount|Y
01|48892|2|1|Special Discount|Y
01|48892|3|1|Special Discount|Y
01|48894|1|1|TCE-4FAA12(WX) Alpha 12 Power Cable|Y
01|48894|2|1|TCE-94807 Feedback Cable|Y
01|48894|3|1|TCE-96545 Feedback Cable|Y
01|48898|3|1|Return of customer's sample pull stud|Y
01|48925|18|1|*required for ER40 collet extension|Y
01|48925|22|1|*w/ flat|Y
01|48925|23|1|*required for ER8 collet extension|Y
01|48925|27|1|*required for ER8 collet extension|Y
01|48929|1|1|Mimatic 172319 for E-Mag|Y
01|48929|1|2|Quoted 1pc net price|Y
01|48929|2|1|Mimatic 172319 for E-Mag|Y
01|48929|2|2|Quoted 2pc net price|Y
01|48929|3|1|Mimatic 172319 for E-Mag|Y
01|48929|3|2|Quoted 3pc net price|Y
01|48930|1|1|Max RPM of Chuck is 2500|Y
01|48930|2|1|H037M15 A11J Adapter Plate|Y
01|48930|3|1|Custom threading per machine specs provided|Y
01|48934|1|1|Table with Fanuc motor|Y
01|48934|2|1|Installation Includes: drive amp bulkhead cable set|Y
01|48934|2|2|external cable set communication cable parameter|Y
01|48934|2|3|changes travel and labor for installation of two|Y
01|48934|2|4|CNC180FA-M on one Accutron VMC.|Y
01|48934|3|1|FREE $1K Tooling Certificate good for list price tool|Y
01|48934|3|2|holders. (One certificate per table.)|Y
01|48936|1|1|Net Price Each|Y
01|48936|2|1|Net Price Each|Y
01|48936|3|1|Net Price Each|Y
01|48936|4|1|Net Price Each|Y
01|48936|5|1|Net Price Each|Y
01|48936|6|1|Net Price Each|Y
01|48936|7|1|Net Price Each|Y
01|48936|8|1|Net Price Each|Y
01|48936|9|1|Net Price Each|Y
01|48936|10|1|Net Price Each|Y
01|48936|11|1|Net Price Each|Y
01|48936|12|1|Net Price Each|Y
01|48936|13|1|Net Price Each|Y
01|48936|14|1|Net Price Each|Y
01|48936|15|1|Net Price Each|Y
01|48936|16|1|Net Price Each|Y
01|48936|17|1|Net Price Each|Y
01|48936|18|1|Net Price Each|Y
01|48936|19|1|Net Price Each|Y
01|48936|20|1|Net Price Each|Y
01|48936|21|1|Net Price Each|Y
01|48947|1|1|Table with Fanuc motor.|Y
01|48947|2|1|Installation Includes: drive amp bulkhead cable set|Y
01|48947|2|2|external cable set communication cable parameter|Y
01|48947|2|3|changes travel and labor for installation of two|Y
01|48947|2|4|CNC180FA-M tables on one Accutron VMC.|Y
01|48947|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|48947|3|2|holders. (One certificate per table)|Y
01|48965|4|1|NBT30-SK16C-90P-J Coolant nuts to be installed at|Y
01|48965|4|2|Lyndex-Nikken prior to shipping.|Y
01|48965|10|1|NBT30-SK16C-60P-J Coolant nuts to be installed at|Y
01|48965|10|2|Lyndex-Nikken prior to shipping.|Y
01|48965|36|1|Coolant Nuts to be swapped in place of non-coolant type|Y
01|48965|36|2|prior to shipping.|Y
01|48965|37|1|Coolant Nuts to be swapped in place of non-coolant type|Y
01|48965|37|2|prior to shipping.|Y
01|48972|1|1|UNV 646>>> NMTB50-1000-3.125>>>Mfg with chip pocket|Y
01|48972|1|2|only>> RFID 1778  12.4mm X 2.0mm>>> Chip must not|Y
01|48972|1|3|protude from flange.|Y
01|48988|1|1|Reference RGA# T-46169|Y
01|48988|1|2|Customer has declined repair and replacement of|Y
01|48988|1|3|CNCZ321LYA s/n: 6877. Inspection fee of $300.00 net to|Y
01|48988|1|4|be assessed.|Y
01|48988|2|1|Return of customer's CNCZ321LYA s/n: 6877. Table to be|Y
01|48988|2|2|returned disassembled.|Y
01|48993|3|1|500psi unit and tank for table brake system.|Y
01|48993|4|1|Installation Includes: drive amp bulkhead cable set|Y
01|48993|4|2|external cable set communication cable parameter|Y
01|48993|4|3|changes travel and labor for installation of one|Y
01|48993|4|4|table on one MORI DuraVertical 5080 VMC.|Y
01|48995|3|1|500psi unit and tank for table brake system.|Y
01|48995|4|1|Installation Includes: drive amp bulkhead cable set|Y
01|48995|4|2|external cable set communication cable parameter|Y
01|48995|4|3|changes travel and labor for installation of one|Y
01|48995|4|4|table on one MORI DuraVertical 5080 VMC.|Y
01|49002|3|1|Includes: help with installatin of A21 table on machine|Y
01|49002|3|2|***Optional***|Y
01|49017|1|1|To be DIN modified before shipping|Y
01|49017|2|1|DIN modification of C5006-25-4.00|Y
01|49017|3|1|To be DIN modified before shipping|Y
01|49017|4|1|DIN modification of C5006-32-4.00|Y
01|49026|4|1|Dimensions: 12.75W x 9.5D x 2.5H|Y
01|49026|5|1|Dimensions: 5.75W x 5.5D x 2H|Y
01|49033|1|1|Net Price Each|Y
01|49034|4|1|Dimensions: 12.75W x 9.5D x 2.5H|Y
01|49034|5|1|Dimensions: 5.75W x 5.5D x 2H|Y
01|49060|1|1|*qty break 1-19pcs|Y
01|49060|3|1|*qty break 20-29pcs|Y
01|49060|5|1|*qty break 30+pcs|Y
01|49068|1|1|Use above part number for stock being brought direct|Y
01|49068|1|2|from Nikken factory versus DIN burn here in US service.|Y
01|49068|3|1|DIN modification of above holder to BT40-SK10-90-DIN|Y
01|49068|5|1|DIN modification of above holder to BT40-SK25-90-DIN|Y
01|49074|1|1|Net Price Each|Y
01|49086|5|1|Not to be sold as an individual item|Y
01|49086|5|2|This block requires Machine make model for release|Y
01|49088|1|1|Tooling Certificate Number: 10015-602-040215|Y
01|49090|1|1|Custom Positioning Block per Baker Hill provided specs.|Y
01|49103|1|1|HW-SJ-12-CHS-3S-50|Y
01|49103|1|2|Price per Jaw 3 pieces equal 1 set.|Y
01|49103|3|1|HW-SJ-12S-CHS-1.5S-50|Y
01|49103|3|2|Price per Jaw 3 pieces equal 1 set.|Y
01|49106|1|1|Installation of existing table: Includes bulkhead cable|Y
01|49106|1|2|external cables parameter changes service time and|Y
01|49106|1|3|travel. Note:Drive must be present.|Y
01|49106|3|1|Support table center height does not match the rotary|Y
01|49106|3|2|table. Sub plate is not included.|Y
01|49141|1|1|Reference RGA# R-47845|Y
01|49141|1|2|1x T32342 s/n: A0012|Y
01|49141|3|1|Collet nut bearings seals & o-rings are all worn|Y
01|49141|3|2|and must be replaced.|Y
01|49141|3|3|Pricing includes labor.|Y
01|49163|1|1|AC3-ECH10F-35 Polygon C3|Y
01|49170|25|1|End Mill Holder Jet Slot Modification|Y
01|49170|26|1|This line is referenced at your NET cost.|Y
01|49190|1|1|Reference RGA# R-47845|Y
01|49190|1|2|T32342A02 s/n: A0012|N
01|49190|3|1|Collet nut is damaged and must be replaced.|Y
01|49190|3|2|Bearings seals and o-rings are worn and must be|Y
01|49190|3|3|replaced. Labor is included.|Y
01|49191|2|1|+/-5 seconds Hedenhain Scale with mounting kit.|Y
01|49193|2|1|Power and feedback signal cable wireharness motor|Y
01|49193|2|2|cover solenoid and pressure switches if needed.|Y
01|49193|4|1|Installation includes: Bulkhead cable set external|Y
01|49193|4|2|cable sets parameter changes service time and travel.|Y
01|49208|1|1|TO REPLACE DAMAGE CNC-202LFA WITHOUT MOTOR|Y
01|49208|1|2|S/N 7085A. THE REPAIR COST DOES NOT WANRAANT REPAIR|Y
01|49208|1|3|LYNDEWX NIKKEN TO OFFER A SPECIAL ONE TIME DISCOUNT|Y
01|49208|1|4|FOR NEW REPLACEMENT TABLE.|Y
01|49208|1|6|TABLE BEING REPLACED DUE TO COOLANT RUST WEAR AND|Y
01|49208|1|7|POSSIBLY CRASH.|Y
01|49222|3|1|Balluff Chip BIS M122-02/A|Y
01|49239|6|1|T05-016 can be used as a substitute for ZKG12-1/4U.|Y
01|49241|1|1|Net Price Each|Y
01|49283|1|1|Unit features air brake. No auxiliary hydrualic unit|Y
01|49283|1|2|required.|Y
01|49315|1|1|CNCZ180SABR2-QT Set 2-CNC180SABR2 tables with R650X1|Y
01|49315|1|2|installation package.|Y
01|49316|1|1|HSK125A-C1.1/4-101.6= C1.1/4 4GL|Y
01|49316|1|2|This item is non-cancellable and non-returnable.|Y
01|49316|2|1|HSK125A-C1.1/4-165.1=C1.1/4 6.5 GL|Y
01|49316|2|2|This item is non-cancellable and non-returnable.|Y
01|49316|3|1|HSK125A-C1.1/4-247.65=C1.1/4 9.75GL|Y
01|49316|3|2|This item is non-cancellable and non-returnable.|Y
01|49316|4|1|HSK125A-C1.1/4-133.35=C1.1/4 5.25 GL|Y
01|49316|4|2|This item is non-cancellable and non-returnable.|Y
01|49316|6|1|HSK125A-ER32-6.50 =ER32 6.5 GL|Y
01|49316|6|2|This item is non-cancellable and non-returnable.|Y
01|49316|7|1|This item is non-cancellable and non-returnable.|Y
01|49320|3|1|Installation: Drive unit short bar fiber optic cable|Y
01|49320|3|2|communications cable bulkhead cables external cables|Y
01|49320|3|3|parameter changes service time and travel.|Y
01|49321|1|1|Reference RGA# T-47944|Y
01|49321|1|2|5AX-130FA-M s/n: 4303|N
01|49321|9|1|23 hours for backlash adjustments on both axis.|Y
01|49322|1|1|Tooling Certificate Number: 13170TA-751-030216|Y
01|49326|2|1|3-jaw scroll chuck with hard jaws and T-wrench included|Y
01|49340|2|1|Added for consideration|Y
01|49343|1|1|Special Net Price|Y
01|49351|1|1|Special Net Price|Y
01|49356|10|1|Alternative for above holder H100A-SF0750-4.13|Y
01|49393|1|1|200MM 4th and 5th axis rotary table with Haas motors &|Y
01|49393|1|2|cable sets.|Y
01|49412|4|1|Modi to DIN 2 holes.|Y
01|49412|4|2|C5007-0750-3.50DIN|Y
01|49412|4|3|Non-Cancelable & Non-Returnable|Y
01|49440|2|1|This line at no charge as a courtesy to the customer|Y
01|49440|3|1|This line at no charge as a courtesy to the customer|Y
01|49440|21|1|This line is referenced at your NET cost.|Y
01|49448|1|1|KM20-14.5 Non Anniversary|Y
01|49456|1|1|Reference RGA# R-47974|Y
01|49456|1|2|OKL3-ER32X s/n: AL567|N
01|49456|3|1|Collet nut is damaged and must be replaced.|Y
01|49456|3|2|Bearings seals and o-rings are worn and must be|Y
01|49456|3|3|replaced. Labor is included.|Y
01|49456|5|1|OKL3-ER32Z-OFMS s/n: AL136|N
01|49456|7|1|Collet nut is damaged and must be replaced.|Y
01|49456|7|2|Bearings seals and o-rings are worn and must be|Y
01|49456|7|3|replaced. Labor is included.|Y
01|49460|24|1|Rack for SK10 Series Collets|Y
01|49460|25|1|Rack for KM1.1/4 & CCK1.1/4 Collet Series|Y
01|49473|2|1|NK20-8   8mm Straight Collet Depth Adjustable|Y
01|49476|1|1|Tooling Certificate Number: 13679-752-030316|Y
01|49496|2|1|Okuma Live   X-axis Internal coolant SK20|Y
01|49504|1|1|Reference RGA# T-47968|Y
01|49504|1|2|CNCZ180 s/n: 12178|N
01|49517|1|1|Reference RGA# Q-47912|Y
01|49517|1|2|C5005-0875-5.66|N
01|49520|1|1|Reference RGA# R-47887|Y
01|49520|1|2|C5005-0875-5.66|N
01|49520|6|1|Labor is $110.00/hour. Price reflects 1.5 hours of|Y
01|49520|6|2|labor.|Y
01|49554|1|1|Reference RGA# R-47978|Y
01|49554|1|2|B40RAM-ER-ER20-232ST s/n: 54295 01|N
01|49554|3|1|Bearings seals and o-rings must be replaced. Labor is|Y
01|49554|3|2|included.|Y
01|49568|4|1|Installation includes: Bulkhead cables external cables|Y
01|49568|4|2|parameter changes service time and travel.|Y
01|49568|4|3|Drive unit must be installed from the factory for DDR|Y
01|49568|4|4|table.|Y
01|49568|5|1|Installation includes: Drive unit short bar fiber|Y
01|49568|5|2|optic cable communications cable bulkhead cables|Y
01|49568|5|3|external cables parameter changes service time and|Y
01|49568|5|4|travel.|Y
01|49571|1|1|Reference RGA# R-47948|Y
01|49571|1|2|C40RAM-ER25-215ST s/n: 35515 01|N
01|49571|3|1|Bearings seals and o-rings are worn and must be|Y
01|49571|3|2|replaced. Spindles must be resurfaced. Labor is|Y
01|49571|3|3|included.|Y
01|49575|1|1|200MM 4th and 5th axis rotary table with cables sets|Y
01|49575|1|2|and pneumatic clamping.|Y
01|49583|1|1|Quoted at net price|Y
01|49587|1|1|105MM High Speed Table w/Siemens 1FK7042-5AF71-1FG0|Y
01|49587|2|1|105MM High Speed Table without Siemens motor|Y
01|49607|3|1|Installation kit: Drive unit short bar fiber|Y
01|49607|3|2|optic cable communications cable bulkhead cables|Y
01|49607|3|3|external cables parameter changes service time and|Y
01|49607|3|4|travel.|Y
01|49608|1|1|*Net pricing for specials.|Y
01|49611|1|1|Balance in 10 weeks. With PS-N46A / PS-N46AE installed|Y
01|49611|1|2|at factory.|Y
01|49611|3|1|This line at no charge as a courtesy to the customer.|Y
01|49611|4|1|Balance ETA pending|Y
01|49611|6|1|Balance ETA 1-2 weeks|Y
01|49611|9|1|Balance in 10 weeks|Y
01|49611|10|1|This rack will store up to 24 tools.|Y
01|49617|1|1|*Non-returnable|Y
01|49627|1|1|Reference RGA# T-47874|Y
01|49627|1|2|#1 Alpha 21 Controller|N
01|49634|1|1|Reference RGA# T-47986|Y
01|49634|1|2|TCD-37103/0|N
01|49655|3|1|Reference RGA# T-47954|Y
01|49655|3|2|5AX-201 s/n: 1235|N
01|49660|4|1|INSTALLATION INCLUDES DRIVE WIRE HARNESS CABLE FROM|Y
01|49660|4|2|SERVO TO BULKHEAD LABOR TRAVEL TRAINING|Y
01|49666|1|1|Reference RGA# T-47935|Y
01|49666|1|2|5AX-2MT-130-170BAYABR s/n: NA|N
01|49683|2|1|This line is referenced at your NET cost.|Y
01|49683|20|1|This line at no charge as courtesy to the customer.|Y
01|49683|21|1|This line at no charge as courtesy to the customer.|Y
01|49696|1|1|To be used for a 1/16 diameter cutting tool|Y
01|49696|2|1|To be used for a 1/8 diameter cutting tool|Y
01|49697|1|1|HSK125A-C1.1/4-101.6= C1.1/4 4GL|Y
01|49697|2|1|HSK125A-C1.1/4-165.1=C1.1/4 6.5 GL|Y
01|49697|3|1|HSK125A-C1.1/4-247.65=C1.1/4 9.75GL|Y
01|49697|4|1|HSK125A-C1.1/4-133.35=C1.1/4 5.25 GL|Y
01|49697|6|1|HSK125A-ER32-6.50 =ER32 6.5 GL|Y
01|49701|2|1|Interface kit for DD250LF-150|Y
01|49717|1|1|Reference RGA# R-47981|Y
01|49717|1|2|1x PF-2|N
01|49727|1|1|Dual Output|Y
01|49740|2|1|Small external pump to be mounted on hte back of the|Y
01|49740|2|2|reciprocating type. Air/hyd|Y
01|49740|4|1|500psi hydraulic pump with solenoid pressure switches|Y
01|49740|4|2|and hoses with quick disconnects.|Y
01|49746|1|1|This pricing includes the table with Haas motor along|Y
01|49746|1|2|with the angle plate to stand the table upright for|Y
01|49746|1|3|vertical use.|Y
01|49746|1|4|***Will have to have angle plate made and could add to|Y
01|49746|1|5|overall delivery.***|Y
01|49746|2|1|500PSI unit and tank for table braking system.|Y
01|49750|1|1|This line is referenced at your NET price|Y
01|49750|2|1|This line is referenced at your NET price|Y
01|49753|1|1|*uses ZKN24 and ZKG24 tap collets|Y
01|49762|2|1|They only get 25% if they order all three holders|Y
01|49770|1|1|Delivery is approx 6 weeks if they can use the existing|Y
01|49770|1|2|110mm taper pin stylenot specific to the machine like|Y
01|49770|1|3|the special that is being quoted.If they need specific|Y
01|49770|1|4|pin delivery is additional 1-2 weeks which is almost|Y
01|49770|1|5|the same as the special quoted below.|Y
01|49770|1|6|Gear Ratio >>> 1:2.25|Y
01|49770|1|7|C50FHM-ER25-195HS-110TP is considered special. Once a|Y
01|49770|1|8|purchase order is placed it cannot be cancelled or|Y
01|49770|1|9|returned.|Y
01|49770|5|1|Special CAT50 Right Angle Head>> Max 5500 RPM Input|Y
01|49770|5|2|11000 Output ER25 Slim Type External Coolant|Y
01|49770|5|3|Net price reflects 1 angle head.|Y
01|49770|7|1|Special CAT50 Right Angle Head>> Max 5500 RPM Input|Y
01|49770|7|2|11000 Output ER25 Slim Type External Coolant|Y
01|49770|7|3|Net price reflects 2 angle heads.|Y
01|49770|9|1|Special CAT50 Right Angle Head>> Max 5500 RPM Input|Y
01|49770|9|2|11000 Output ER25 Slim Type External Coolant|Y
01|49770|9|3|Net price reflects 3 angle heads.|Y
01|49770|11|1|Special CAT50 Right Angle Head>> Max 5500 RPM Input|Y
01|49770|11|2|11000 Output ER25 Slim Type External Coolant|Y
01|49770|11|3|Net price reflects 4+ angle heads.|Y
01|49793|1|1|Reference RGA# T-47980|Y
01|49793|1|2|5AX-130 s/n: 1915|N
01|49804|1|1|This line is referenced at your NET cost.|Y
01|49806|3|1|This line is referenced at your NET cost|Y
01|49819|1|1|Case and Wrenches Included|Y
01|49832|1|1|Special Discount|Y
01|49840|9|1|This line at no charge as a courtesy to the customer|Y
01|49840|12|1|This line at no charge as a courtesy to the customer|Y
01|49840|15|1|This line at no charge as a courtesy to the customer|Y
01|49840|16|1|This line is referenced at your NET cost|Y
01|49848|3|1|CAT50-C32-200U   CAT50 32mm Milling chuck 200mm g.l.|Y
01|49848|4|1|CAT50-C32-195U    CAT50  32mm Milling Chuck 195mm g.l.|Y
01|49867|2|1|HSK63A-SK6C-150P-J SK6C Slim Chuck Hi-Speed w/ Coolant|Y
01|49867|2|2|Nut installed before shipping|Y
01|49867|3|1|HSK63A-SK16C-150P-J SK6C Slim Chuck Hi-Speed w/ Coolant|Y
01|49867|3|2|Nut installed before shipping.|Y
01|49876|1|1|Option #1 - 180mm Faceplate - Alpha2|Y
01|49876|2|1|Option #2 - 200mm faceplate - Alpha4|Y
01|49876|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|49876|3|2|external cable set communication cable parameter|Y
01|49876|3|3|changes travel and labor for one table on one new|Y
01|49876|3|4|machine.|Y
01|49882|1|1|Quoted at a net price.|Y
01|49884|1|1|Net Price reflects removal of E20-Nut and re-package|Y
01|49884|1|2|of tool holder.|Y
01|49901|1|1|CAPTO8 Gear Hobbing Tool for Mori NT6600 #2K7800542C|Y
01|49911|1|1|100MM multi spndle rotary table with Haas motor and|Y
01|49911|1|2|cable set.|Y
01|49913|4|1|BT45-ZL24-130 Nikken Tap Holder|Y
01|49915|2|1|Installtion includes: Drive unit short bar fiber|Y
01|49915|2|2|optic cable bulkhead cable set external cable set|Y
01|49915|2|3|parameter changes service time and travel.|Y
01|49917|1|1|Table drive unit b-axis cable no sheet metal|Y
01|49953|7|1|Std --> HS 1 week|N
01|49980|3|1|HYDRAULIC UNIT FOR BRAKE|Y
01|49983|1|1|Plugged DIN holes|Y
01|50009|1|1|Power and Feedback Cable 13 Meters|Y
01|50009|1|2|Part Number Specfic for Celina Alumium|Y
01|50017|6|1|Quoted at a net price.|Y
01|50017|6|2|Alt. Stock for 165U.|Y
01|50027|1|1|Non-retunrable & non-cancelable|Y
01|50037|2|1|Net price reflects modified holders with coolant nut|Y
01|50037|2|2|installed. Non returnable.|Y
01|50040|7|1|Std --> HS 1 week|N
01|50044|1|1|86673  UMCC1250-6|Y
01|50050|3|1|2 Wrenches are need for 1 tool.|Y
01|50069|1|1|Reference RGA# T-47874|Y
01|50069|1|2|TAT-250 s/n: 2126|N
01|50069|18|1|Reference RGA# T-47874|Y
01|50069|18|2|TAT-250 s/n: NA|N
01|50081|1|1|Reference RGA# T-47998|Y
01|50081|1|2|TAT-250 s/n: 2189|N
01|50090|1|1|Reference RGA# T-47854 & T-47998|Y
01|50090|37|1|Reference RGA# T-47854|Y
01|50090|37|2|CNC260 s/n: 5657H|N
01|50090|71|1|Reference RGA# T-47998|Y
01|50090|71|2|CNC260 s/n: 6665|N
01|50128|3|1|BT45-ZL24-130 Tap Holder|Y
01|50144|1|1|Reference RGA# R-48021|Y
01|50144|1|2|ZERO-SET4|N
01|50160|5|1|H100A-SF0500-8.00|Y
01|50169|2|1|C5046-0250-10.00 CAT50 1/4 ID 10 GL End Mill Holder|Y
01|50169|5|1|C5036-1500-10.00 CAT50 1.5 ID 10 GL End Mill Holder|Y
01|50180|55|1|DIN modification of 2x CAT50-VC6-165U|Y
01|50180|59|1|Center thru hole to be added to 1x S25-SK10-250|Y
01|50180|63|1|#13 MCAT50-GSK10F-225UP|Y
01|50180|63|2|We were able to remove the cutter no additional repair|Y
01|50180|63|3|necessary.|Y
01|50208|1|1|AC5-SLA3/4-65>>> Capto C5 End Mill Holder 3/4|Y
01|50208|3|1|AC5-SLA19.05-65> Capto C5 End Mill Holder 19.05MM|Y
01|50208|3|2|Alternative for AC5-SLA3/4-65|Y
01|50220|1|1|CAT50 Blankbar 5.0 Diameter X 5.0 Gage Length|Y
01|50260|1|1|2-CNCZ180LSABR2 High Speed tables with installation kit|Y
01|50260|3|1|$1000.00 Free tooling promotion.|Y
01|50262|2|1|Large angle plate to support the table in a vertical|Y
01|50262|2|2|position.|Y
01|50262|6|1|Installation includes: Drive unit short bar fiber|Y
01|50262|6|2|optic cable communications cable bulkhead cables|Y
01|50262|6|3|external cables parameter changes service time and|Y
01|50262|6|4|travel.|Y
01|50265|2|1|***OPTIONAL***|Y
01|50265|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|50265|3|2|external cable set parameter changes travel and|Y
01|50265|3|3|labor for installation of one table on one new YCM VMC.|Y
01|50307|4|1|This size not available in dual contact.|Y
01|50307|5|1|This size not available in dual contact.|Y
01|50307|6|1|This size not available in dual contact.|Y
01|50307|7|1|This size not available in dual contact.|Y
01|50309|9|1|For Jackie Miller on new HAAS.|Y
01|50309|10|1|For Jackie Miller on new HAAS.|Y
01|50313|1|1|*Net Price quoted|Y
01|50313|1|2|*Non-Stock item/ Once a PO has been issued it cannot|Y
01|50313|1|3|be cancelled or returned.|Y
01|50314|1|1|Special Net Price Each|Y
01|50314|2|1|Special Net Price Each|Y
01|50314|3|1|Special Net Price Each|Y
01|50352|1|1|4x NCAT40-C3/4-105U|Y
01|50352|1|2|3x NCAT40-C1.1/4SL-105U|Y
01|50352|1|3|2x NCAT40-C3/4-120U|Y
01|50352|1|4|5x NCAT40-C1-105U|Y
01|50357|1|1|Reference RGA# T-47977|Y
01|50357|1|2|CNC100-2W-120FA s/n: 9070|N
01|50365|1|1|UNV_462  HSK125A-0375A-5.750-ID-GKN With Whistle Notch|Y
01|50365|1|2|ID Chip Hole Only/Drawing C1000|Y
01|50365|3|1|UNV_463 HSK125A-0500A-5.750-ID-GKN With Whistle Notch|Y
01|50365|3|2|ID Chip Hole Only/Drawing C1000|Y
01|50365|5|1|UNV_468  HSK125A-0750A-4.750-ID-GKN With Whistle Notch|Y
01|50365|5|2|ID Chip Hole Only/Drawing C1000|Y
01|50365|7|1|UNV_472 HSK125A-1000A-5.625-ID-GKN With Whistle Notch|Y
01|50365|7|2|ID Chip Hole Only/Drawing C1000|Y
01|50365|9|1|UNV_451  HSK125A-SA1000-6.750-ID-GKN Stub Arbor|Y
01|50365|9|2|ID Chip Hole Only/Drawing C1000|Y
01|50365|11|1|UNV_484 HSK125A-1250A-5.625-ID-GKN With Whistle Notch|Y
01|50365|11|2|ID Chip Hole Only/Drawing C1000|Y
01|50365|13|1|UNV_274 HSK125A-1500A-5.6250-ID-GKN With Whistle Notch|Y
01|50365|13|2|ID Chip Hole Only/Drawing C1000|Y
01|50365|15|1|UNV_278  HSK125A-2000-5.500-ID-GKN With Whistle Notch|Y
01|50365|15|2|ID Chip Hole Only/Drawing C1000|Y
01|50365|21|1|HSK125A-ER40-5.00  With Standard Nut|Y
01|50365|21|2|No drawing provided from GKN.|Y
01|50365|23|1|HSK125A-TG150-5.00 With Standard Nut|Y
01|50365|23|2|No drawing provided from GKN.|Y
01|50382|1|1|Tooling Certificate Number: 13170TA-751-030216|Y
01|50390|7|1|Std --> HS 1 week|N
01|50408|10|1|For Jackie Miller on new HAAS.|Y
01|50409|2|1|*Balance to G2.5 @ 10000 RPM|Y
01|50409|2|2|*Balance collet chuck only not whole assembly|Y
01|50409|8|1|*Balance to G2.5 @ 10000 RPM|Y
01|50409|8|2|*Balance collet chuck only not whole assembly|Y
01|50409|11|1|*Balance to G2.5 @ 10000 RPM|Y
01|50409|11|2|*Balance end mill holder only not whole assembly|Y
01|50445|1|1|1.5mm Serrated|Y
01|50445|2|1|3mm Serrated|Y
01|50454|2|1|Installation includes: Drive unitshort bar fiber|Y
01|50454|2|2|optic cablebulkhead cables external cables parameter|Y
01|50454|2|3|changes service time and travel.|Y
01|50458|14|1|Quoted at a net price|Y
01|50458|14|2|Non-returnable and non-refundable|Y
01|50461|6|1|40% discount is based upon a order of 4 or more holders|Y
01|50461|6|2|mix & match any sizes.|Y
01|50482|1|1|2-5AX130BASABR-QT tables with backhand mounted motors|Y
01|50482|1|2|and installation kits.|Y
01|50482|2|1|2-5AX-201SABR2 with installation kit for R650X1|Y
01|50482|2|2|Includes: Drive units junction box sheet metal &|Y
01|50482|2|3|cabinet cables.|Y
01|50485|2|1|Installation inlcudes: Drive unit short bar fiber|Y
01|50485|2|2|optic cable communications cable bulkhead cables|Y
01|50485|2|3|external cables parameter changes service time and|Y
01|50485|2|4|travel.|Y
01|50486|4|1|500PSI pump with solenoid pressure switches and hoses|Y
01|50495|2|1|*** For future purchases we can swap out the standard|Y
01|50495|2|2|nut with the coolant nut for Joe at our facility.  It|Y
01|50495|2|3|will be an additional fee but cheaper than buying both|Y
01|50495|2|4|SK Nuts and not using the standard nut. ***|Y
01|50499|1|1|HSK125A-C3/4-115  (HSK125A-UMC4.53-0750) 1-9pc price|Y
01|50499|2|1|HSK125A-C3/4-115  (HSK125A-UMC4.53-0750) 10-19pc price|Y
01|50499|3|1|HSK125A-C3/4-115  (HSK125A-UMC4.53-0750) 20+pc price|Y
01|50510|2|1|This Nikken table to replace Haas HRT 110 on OM-1A|Y
01|50510|2|2|Layout and solid has been sent to customer|Y
01|50510|2|3|Nikken table supplied with motor and cables|Y
01|50510|2|4|Customer takes full responsibility for installation to|Y
01|50510|2|5|machine. Lyndex Nikken will provide parameters and|Y
01|50510|2|6|phone assistance.|Y
01|50560|1|1|Reference RGA# T-48013|Y
01|50560|1|2|5AX-2002FA s/n: 2050|N
01|50584|1|1|5AX-130 with Haas motors and cables delivery is 1 week|Y
01|50587|1|1|Reference RGA# R-48035|Y
01|50587|1|2|5x CAT40-C3/4-85UG|N
01|50587|4|1|72 pcs per holder|Y
01|50587|5|1|36 pcs per holder|Y
01|50587|6|1|Labor is $110/hour. Price reflects 2.5 hours of labor.|Y
01|50594|1|1|Delivery is 6-8 weeks|Y
01|50661|1|1|Reference RGA# R-47949|Y
01|50661|1|2|1x PF-2|N
01|50664|1|1|TABLE TO REPLACE GOLDEN SUN TABLE BEING USED ON MAZAK|Y
01|50664|1|2|MARTRIX 410 A & B MACJHINES. WE WILL REQUIRE WIRE|Y
01|50664|1|3|SCHEMATICS OR SAMPLE TABLE TO DUPLICATE|Y
01|50664|4|1|INSTALLATION will be determined. will be at cost only|Y
01|50664|4|2|for first machine.|Y
01|50667|1|1|Reference RGA# T-48007|Y
01|50667|1|2|5AX-350FA-R36 s/n: 3523|N
01|50689|1|1|Reference RGA# R-48029|Y
01|50689|1|2|CAT50-NPU13-90U|N
01|50691|1|1|Quoted at a net price|Y
01|50691|3|1|Quoted for alternative consideration to|Y
01|50691|3|2|Modification-PB-SP|Y
01|50694|16|1|Quoted as alternative stock for E25-472|Y
01|50744|3|1|ZQ40-38 Tapper Chuck for Non Stop Chuck|Y
01|50746|2|1|H100A-SF0500-6.50|Y
01|50746|2|2|Minimum Order 10 pcs|Y
01|50751|1|1|Special Net Price Each|Y
01|50751|2|1|Net Price Each|Y
01|50752|1|1|Reference RGA# R-48060|Y
01|50752|1|2|C40RA-0025|N
01|50770|1|1|Net Price Each|Y
01|50770|2|1|Net Price Each|Y
01|50781|1|1|ETA is 1 week after order is placed.|Y
01|50786|1|1|Covers collapse range of 5/64|Y
01|50786|1|2|.198mm=5/64|Y
01|50786|2|1|Covers collapse range of 7/64|Y
01|50786|2|2|7/64-2.76mm|Y
01|50786|3|1|Covers collapse range of 9/64|Y
01|50786|3|2|9/64=3.58mm|Y
01|50786|4|1|Covers collapse range of 11/64|Y
01|50786|4|2|11/64=4.36mm|Y
01|50786|6|1|Covers collapse range of 13/64|Y
01|50786|6|2|13/64=5.156mm|Y
01|50786|9|1|Covers collapse range of 19/64|Y
01|50786|9|2|19/64=7.543mm|Y
01|50786|15|1|Quoted as alternative stock for E25-393|Y
01|50786|20|1|Quoted as alternative stock for E25-472|Y
01|50790|3|1|*Net price|Y
01|50790|3|2|*Lyndex-Nikken to make position block upon receipt of|Y
01|50790|3|3|spindle drawing|Y
01|50807|1|1|NON CANCELABLE NON RETURNABLE|Y
01|50813|1|1|Elmhirst Industries Sterling Heights MI|Y
01|50813|1|2|Redeemable at List Price and Includes Shipping|Y
01|50824|2|1|***This item is a complete special and cannot be|Y
01|50824|2|2|cancelled or returned once ordered***|Y
01|50835|2|1|Quoted for Consideration|Y
01|50844|25|1|Retention studs no quote|Y
01|50844|25|2|Please purchase thru Retention Knob supply|Y
01|50853|1|1|Special Net Price|Y
01|50866|1|1|1 week lead time|Y
01|50869|1|1|Net Price Each|Y
01|50879|1|1|Reference RGA# T-47854|Y
01|50879|1|2|CNC302 s/n: 7652|N
01|50879|33|1|External Cable for CNC302|Y
01|50892|1|1|Reference RGA# T-48062|Y
01|50892|1|2|CNC201 s/n: 1182|N
01|50892|29|1|External cable set with heavy duty conduit to be made|Y
01|50892|29|2|by Lyndex-Nikken.|Y
01|50893|10|1|This line at no charge as a courtesy to the customer|Y
01|50893|15|1|This line at no charge as a courtesy to the customer|Y
01|50893|17|1|This line at no charge as a courtesy to the customer|Y
01|50893|20|1|This line at no charge as a courtesy to the customer|Y
01|50893|22|1|This line at no charge as a courtesy to the customer|Y
01|50939|1|1|1-9pcs Price reflects specific quantity break.|Y
01|50939|2|1|10-20pcs Price reflects specific quantity break.|Y
01|50939|3|1|HSK100A-MDSK16-125|Y
01|50939|3|2|1-9pcs Price reflects specific quantity break.|Y
01|50939|4|1|HSK100A-MDSK16-125|Y
01|50939|4|2|10-20pcs Price reflects specific quantity break.|Y
01|50943|1|1|Reference RGA# R-48080|Y
01|50943|1|2|1x PF-2|N
01|50948|1|1|Reference RGA# R-48064|Y
01|50948|1|2|FP-2|N
01|50948|4|1|Quantity reflects hours of labor.|Y
01|50954|1|1|Bearings/Seals/O-Ring Kit for MNZ20-ER11(X)-SUB-SP|Y
01|50963|2|1|Installation Includes: drive amps bulkhead cable set|Y
01|50963|2|2|external cable set communication cables parameter|Y
01|50963|2|3|changes travel and labor for installing one table on|Y
01|50963|2|4|one machine.|Y
01|50964|2|1|Hydraulic Pancake Cylinder|Y
01|50964|3|1|External Cables for 5AX-130FA-M - Tilt and Rotary|Y
01|50965|2|1|External Cables for 5AX-201 - Tilt and Rotary|Y
01|50966|2|1|NIKKEN 5AX-201YA-M WITH AIR BRAKE.|Y
01|50966|2|2|MACHINE MUST HAVE 4TH AND 5TH AXIS INTERFACE|Y
01|50966|2|3|CONFIRMATION OF THIS NEEDED.|Y
01|50966|2|4|PARAMETERS NEED CHANGE|Y
01|50966|2|5|NIKKEN TABLE INCLUDES PROPER SERVO MOTORS COMPATABLE|Y
01|50966|2|6|WITH HAAS MACHINE(YASNAC)|Y
01|50966|2|7|EXTERNAL CABLE SET FOR BOTH AXIS INCLUDED|Y
01|50966|3|1|TWO SET OF CABLES/ ROTATION/TILT|Y
01|50967|1|1|NIKKEN TABLES IN STOCK. WE HAVE ORDERED THYE HAAS MOTOR|Y
01|50967|1|2|SHIP DATE FROM LYNDEX NIKKEN 1 WEEK TO 10 DAYS ARO.|Y
01|50972|4|1|Non-returnable and non-cancellable.|Y
01|50972|5|1|Non-cancellable and non-returnable|Y
01|50990|3|1|Includes: drive amp bulk head cable set|Y
01|50990|3|2|fiber optic cable communication cable|Y
01|50990|3|3|travel and labor for installation.|Y
01|50993|3|1|Motor to be compatible with SVM1-401Amp|Y
01|50993|4|1|INCLUDED NO CHARGE|Y
01|50993|6|1|INCLUDED NO CHARGE|Y
01|50995|1|1|Discount reflects 1 to 30 pull studs.|Y
01|50995|3|1|Discount reflects 31 + pull studs.|Y
01|51003|54|1|Substitute for E32-047(C)|Y
01|51003|64|1|Holder is non standard stock once a purchase order|Y
01|51003|64|2|is placed it cannot be cancelled or returned.|Y
01|51005|1|1|Discount reflects 1 to 30 pull studs.|Y
01|51005|3|1|Discount reflects 31 + pull studs.|Y
01|51014|2|1|HSK50E-ER25-4.00 HSK50E Taper ER25 Collet Chuck 4 GL|Y
01|51014|3|1|HSK50E-ER25-4.00 HSK50E Taper ER25 Collet Chuck 4 GL|Y
01|51014|4|1|HSK50E-ER25-6.00 HSK50E Taper ER25 Collet Chuck 6 GL|Y
01|51014|5|1|HSK50E-ER25-6.00 HSK50E Taper ER25 Collet Chuck 6 GL|Y
01|51016|4|1|Lyndex-Nikken to make block for Haas VF4SS|Y
01|51025|54|1|Substitute for E32-047(C)|Y
01|51025|64|1|Holder is non standard stock once a purchase order|Y
01|51025|64|2|is placed it cannot be cancelled or returned.|Y
01|51035|5|1|NBT30-SK16C-60P-J Coolant High Speed Nuts installed at|Y
01|51035|5|2|Lyndex-Nikken prior to shipping.|Y
01|51035|7|1|NBT30-SK16C-90P-J Coolant High Speed Nuts installed at|Y
01|51035|7|2|Lyndex-Nikken prior to shipping.|Y
01|51035|12|1|NBT30-SK13C-120P-J Coolant High Speed Nuts installed at|Y
01|51035|12|2|Lyndex-Nikken prior to shipping.|Y
01|51035|13|1|SK13-12P|Y
01|51035|14|1|SKJ13-12C utilizes SKJ16-12C cap|Y
01|51035|15|1|SK13-10P|Y
01|51035|16|1|SKJ13-10C utilizes SKJ16-10C Cap|Y
01|51035|17|1|SK13-5P|Y
01|51035|18|1|NBT30-SMA16-30 1pc in stock in Japan/Bal ETA 12 weeks|Y
01|51035|19|1|NBT30-SK10C-60P-J Coolant High Speed Nuts installed at|Y
01|51035|19|2|Lyndex-Nikken prior to shipping.|Y
01|51035|22|1|NBT30-SK20C-75P-J Coolant High Speed Nuts installed at|Y
01|51035|22|2|Lyndex-Nikken prior to shipping.|Y
01|51035|23|1|SK20-20P|Y
01|51035|24|1|SKJ20-20C utilizes SKJ25-20C Cap|Y
01|51035|25|1|SK20-16P|Y
01|51035|27|1|NBT30-SK10C-90P-J Coolant High Speed Nuts installed at|Y
01|51035|27|2|Lyndex-Nikken prior to shipping.|Y
01|51035|30|1|NBT30-SK10C-120P-J Coolant High Speed Nuts installed at|Y
01|51035|30|2|Lyndex-Nikken prior to shipping.|Y
01|51035|45|1|NBT30-SK13C-90P-J Coolant High Speed Nuts installed at|Y
01|51035|45|2|Lyndex-Nikken prior to shipping.|Y
01|51035|49|1|NBT30-DJ8-84AN 2LOCK DJ Boring Bar|Y
01|51035|50|1|J16-5-25 DJ Solid Carbide Boring Bit|Y
01|51035|51|1|J16-28-85 DJ Solid Carbide Boring Bit|Y
01|51046|2|1|DELIVERY 45 DAYS ARO FROM NIKKEN JAPAN|Y
01|51055|2|1|Installation on Hyundai Wia HS4000|Y
01|51076|1|1|Note** Need approval after your order.|Y
01|51096|54|1|Substitute for E32-047(C)|Y
01|51096|64|1|Holder is non standard stock once a purchase order|Y
01|51096|64|2|is placed it cannot be cancelled or returned.|Y
01|51116|3|1|Cable set|Y
01|51121|4|1|CCK1.1/4-11S - Inch Coolant Collet Set includes:|Y
01|51121|4|2|3/161/45/163/87/161/29/165/83/47/81 collets|Y
01|51121|5|1|CKFN32(1.1/4)-SET Inch Coolant Slotted Nut Includes:|Y
01|51121|5|2|3/161/45/163/87/161/29/165/83/47/81|Y
01|51121|7|1|CCK1.1/4-SET Metric Coolant Collet Set includes:|Y
01|51121|7|2|68101214162025mm|Y
01|51121|9|1|CCK32(1.1/4)-SET Metric Coolant Slotted  Nut Includes:|Y
01|51121|9|2|68101214162025mm|Y
01|51145|1|1|Onsized 3/16 Collet.|Y
01|51145|2|1|Collapse range 0.236-0.216 covering 15/64 (0.2344)|Y
01|51149|1|1|Discount reflects 1 to 5 tap holders.|Y
01|51149|3|1|Discount reflects 6 to 12 tap holders.|Y
01|51152|5|1|Installation of CNC302FA-M on Doosan DNM750|Y
01|51152|5|2|Fanuc Oi-MD Control|Y
01|51154|14|1|Blank machinable disc for 2mm|Y
01|51157|1|1|Referece RGA# R-48116|Y
01|51157|1|2|PF-2|N
01|51157|6|1|N Style batteries.|Y
01|51164|1|1|4 Hole Burn|N
01|51180|7|1|H40E-SF0125-2.36 Shrink Fit Holder|Y
01|51204|1|1|This line is referenced at your NET cost|Y
01|51217|1|1|****Cable connections to table must be moved to inside|Y
01|51217|1|2|of the trunnion/motor covers.****|Y
01|51217|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|51217|3|2|holders.|Y
01|51223|1|1|*Insert Depth = 160mm|Y
01|51223|1|2|*Draw bolt depth = 70mm|Y
01|51223|1|3|*See Drawing for reference|Y
01|51223|1|4|*Net Price Quote for Specials|Y
01|51223|7|1|Wrench for T50U-C32-150S|Y
01|51242|20|1|covers range for:  7/32|Y
01|51242|21|1|covers range for:  9/32|Y
01|51261|2|1|Installation includes: Bulkhead cables external cables|Y
01|51261|2|2|service time and travel for installation help.|Y
01|51266|3|1|Position Block made by Lyndex-Nikken upon receipt of|Y
01|51266|3|2|spindle drawing/machine info|Y
01|51272|3|1|Installation includes: Drive unit short bar fiber|Y
01|51272|3|2|optic cablecommunications cable bulkhead cables|Y
01|51272|3|3|external cables parameter changes service time and|Y
01|51272|3|4|travel.|Y
01|51283|1|1|Net price quoted.|Y
01|51284|1|1|Custom ER16 U-Tool - Mega Turn 900M  QTY 1|Y
01|51284|2|1|Custom ER16 U-Tool - Mega Turn 900M QTY 2|Y
01|51288|1|1|TABLES TO REPLACE EXISTING TABLES AT EXACTECH|Y
01|51288|1|2|MUST CONFIRM MOTOR CABLE DRIVE ON MACHINE|Y
01|51288|2|1|Air/Hyd booster for the brake system.|Y
01|51288|3|1|CABLE DESIGN TO BE CONFIRMED|Y
01|51290|8|1|We do not carry a 7/64 collet without coolant so the|Y
01|51290|8|2|E16-118 .118-.098 will hold 7/64 no coolant.|Y
01|51290|10|1|We do not carry a 15/64 collet without coolant so the|Y
01|51290|10|2|E16-236 .236-.216 will hold 15/64 no coolant.|Y
01|51290|17|1|We do not carry a 37/64 collet without coolant so the|Y
01|51290|17|2|E25-590 .590-.551 will  hold 37/64 no coolant.|Y
01|51310|1|1|Net Price Each|Y
01|51314|15|1|NB3006-0750-3.00|Y
01|51337|3|1|Installation includes: Drive unit short bar fiber|Y
01|51337|3|2|optic cable communications cable bulkhead cables|Y
01|51337|3|3|external cables parameter changes service time|Y
01|51337|3|4|and travel.|Y
01|51358|1|1|Balance in 1-2 weeks|Y
01|51365|1|1|Table with Fanuc motor.|Y
01|51365|2|1|Installation Kit Includes: drive amp bulk head cable|Y
01|51365|2|2|set external cable set and communication cable for|Y
01|51365|2|3|YCM TV146B VMC - One table set up.|Y
01|51368|1|1|Tables with Mitts motors.|Y
01|51368|2|1|Installation Includes: drive amps bulkhead cable set|Y
01|51368|2|2|external cable sets communication cable parameter|Y
01|51368|2|3|changes travel and labor for installation of two|Y
01|51368|2|4|CNCZ105MA-M on one Hardinge V-480 VPCMC.|Y
01|51368|3|1|FREE $1K Tooling Certificate with each table good for|Y
01|51368|3|2|list price tool holders.|Y
01|51384|2|1|Delivery will be confirmed at time of order.|Y
01|51387|6|1|Wrench for BT30-SK16-60|Y
01|51397|1|1|*special pricing -|Y
01|51397|1|2|Core Replacements of Hitachi Metals 3x CNC260 rotary|Y
01|51397|1|3|tables. Lyndex-Nikken will keep used tables.|Y
01|51397|3|1|in Mori Dura Vertical|Y
01|51399|1|1|Above holders to be Coolant Port modified prior to ship|Y
01|51423|6|1|Wrench for BT30-SK16-60|Y
01|51440|1|1|Convert from Non-slotted version|Y
01|51442|1|1|Reference RGA# T-48109|Y
01|51442|1|2|CNC180LYA-BR s/n: NA|Y
01|51454|8|1|Stud for Haas VF4SS|Y
01|51456|2|1|includes PS-N63AE pull stud shown below.|Y
01|51456|3|1|installed at factory on above NC5-63-TB40-300 Testbar|Y
01|51456|5|1|POWER-63-D40 Power5 System for Pull Force Meter|Y
01|51456|5|2|**NO QUOTE*** This will be installed on to machine|Y
01|51456|5|3|spindle. Customer needs to order through machine|Y
01|51456|5|4|manufacturer.|Y
01|51458|1|1|86663  UMCC0750-16|Y
01|51458|2|1|86672  UMCC1000-20|Y
01|51488|1|1|C50RAM-MI63-215IC-110TP|Y
01|51488|1|2|CAT50 RAH MI63 Internal Coolant 110mm taper pin|Y
01|51488|4|1|C50RAM-MI63-215IC-110TP|Y
01|51488|4|2|CAT50 MI63 RAH Internal Coolant 110mm Pitch Tapered Pin|Y
01|51519|1|1|for Hitachi VS-50 Machine|Y
01|51524|1|1|Package includes:CNC202AA21 table with external cable|Y
01|51524|1|2|set control box with pendantM-code cable power cable|Y
01|51524|1|3|and RS-232|Y
01|51524|2|1|Installation includes: M-code connection mounting of|Y
01|51524|2|2|Nikken CNC202AA21 table and controllers and RS232|Y
01|51524|2|3|connection.|Y
01|51527|3|1|INSTALLATION INCLUDES 4TH AND 5TH AXIS DRIVES|Y
01|51527|3|2|ALL CABLING CONNECTORS LABOR TRAVEL TRAINING|Y
01|51528|1|1|THIS TABLE COMPLETE WITH ALL ELECTRONICS|Y
01|51530|1|1|Table with Fanuc motor|Y
01|51530|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|51530|2|2|external cable set communication cable parameter|Y
01|51530|2|3|changes travel and labor for installation of one|Y
01|51530|2|4|rotary table on one Matsuura VX1000 VMC.|Y
01|51530|3|1|FREE $1K Tooling Certificate good for list price tool|Y
01|51530|3|2|holders.|Y
01|51531|1|1|NCAT40-HC0250-2.50|Y
01|51533|4|1|Nut Wrench for MI40-ER25I|Y
01|51533|5|1|Spindle Wrench for MI40-ER25I|Y
01|51533|6|1|Positioning Block not Included|Y
01|51533|7|1|Positioning Block Not Included|Y
01|51537|1|1|Twin Spindle Rotary Table with Okuma Motor.|Y
01|51537|2|1|Pneumatic tail stocks with MT#3 center sockets.|Y
01|51537|2|2|C/L height matches the table C/L height.|Y
01|51537|3|1|Includes: 5C nose piece pheumatic cylinder drawbar|Y
01|51537|3|2|indepndent manual control hand valve.|Y
01|51547|1|1|without motor|Y
01|51547|1|2|motor will be used from existing unit and installed|Y
01|51547|1|3|at no charge.|Y
01|51547|1|4|shipping charges to send and return are responsibility|Y
01|51547|1|5|of customer.|Y
01|51547|3|1|Center Height Adjustable 125 - 135mm|Y
01|51552|3|1|Cable Package consisting of Internal Power and|Y
01|51552|3|2|Feedback cables.|Y
01|51552|4|1|Net Price - Install scheduled at time of order|Y
01|51558|1|1|*Chuck plate is not included  (sold separate)|Y
01|51558|1|2|*Confirm with customer for Blank or Threaded Draw Nut*|Y
01|51558|1|3|*Howa Part# H037M5 15 refers to 1.5mm serration pitch|Y
01|51562|2|1|Includes (2) servo amplifiers all cables|Y
01|51562|2|2|and installation on machine.|Y
01|51562|2|3|Customer responsible for control ladder logic and|Y
01|51562|2|4|control options necessary to support 5 axis|Y
01|51562|2|5|functions.|Y
01|51562|2|6|Machine: Kitamura 3XI|Y
01|51562|2|7|Control: Fanuc 16I-MB|Y
01|51563|1|1|NIT50-C20EX-105|Y
01|51563|1|2|Dual Contact IT50 Taper 20mm X-Treme Shank|Y
01|51563|2|1|NIT50-C25EX-110|Y
01|51563|2|2|Dual Contact IT50 Taper 25mm X-Treme Shank|Y
01|51563|3|1|NIT50-C12EX-95|Y
01|51563|3|2|Dual Contact IT50 Taper 12mm X-Treme Shank|Y
01|51563|4|1|NIT50-C16EX-105|Y
01|51563|4|2|Dual Contact IT50 Taper 16mm X-Treme Shank|Y
01|51565|1|1|CAT50 Blankbar 5.315 X 6.00|Y
01|51585|8|1|Wrenches are quoted above at no charge.|Y
01|51625|1|1|Multi Spindle Custom Tool w/3 holes spaced at|Y
01|51625|1|2|at 120 degrees at 29.700mm per E/U design needs|Y
01|51625|1|3|1pc price quoted above|Y
01|51625|2|1|Multi Spindle Custom Tool w/3 holes spaced at|Y
01|51625|2|2|at 120 degrees at 29.700mm per E/U design needs|Y
01|51625|2|3|2pc price quoted above|Y
01|51625|3|1|Multi Spindle Custom Tool w/3 holes spaced at|Y
01|51625|3|2|at 120 degrees at 29.700mm per E/U design needs|Y
01|51625|3|3|3pc price quoted above|Y
01|51659|1|1|NBT30-SK13C-60P-J Coolant Nut installed at L-N|Y
01|51659|2|1|Coolant nut to be installed on NBT30-SK13C-60P-J above.|Y
01|51659|2|2|Included in price of holder.|Y
01|51659|3|1|SK13-10P|Y
01|51659|6|1|SK13-8P|Y
01|51659|8|1|NBT30-SK16C-60P-J Coolant Nut installed at L-N|Y
01|51659|9|1|Coolant nut to be installed on NBT30-SK16C-60P-J above.|Y
01|51659|9|2|Included in price of holder.|Y
01|51659|12|1|NBT30-SK10C-60P-J Coolant Nut installed at L-N|Y
01|51659|13|1|Coolant nut to be installed on NBT30-SK10C-60P-J above.|Y
01|51659|13|2|Included in price of holder.|Y
01|51659|24|1|NBT30-C20-60 Taper Plus 30 taper C20 Milling Chuck 60mm|Y
01|51659|26|1|NBT30-C25-80G|Y
01|51659|27|1|CCK25-18|Y
01|51659|30|1|NBT30-SK13C-75-J Coolant Nut installed at L-N|Y
01|51659|31|1|Coolant nut to be installed on NBT30-SK13C-75-J above.|Y
01|51659|31|2|Included in price of holder.|Y
01|51685|2|1|Modifications to CNC260|Y
01|51685|5|1|Modifications to TAT-200|Y
01|51706|2|1|Modification to CNC260.|Y
01|51706|5|1|Modification to TAT-200.|Y
01|51716|1|1|Table with Haas Motors and Cables.|Y
01|51716|2|1|For Graphite Machining.|Y
01|51716|3|1|FREE $1K Tooling Certificate good for list price tool|Y
01|51716|3|2|holders.|Y
01|51722|1|1|T32218 and T32207|Y
01|51722|2|1|T32233|Y
01|51722|3|1|T32206|Y
01|51722|4|1|T32232|Y
01|51728|1|1|BT40-SK10-90-J coolant nut to be installed at Lyndex|Y
01|51728|1|2|Nikken prior to shipping. Price includes nut swap.|Y
01|51728|2|1|SKN-16BJ to be installed on above holder prio to ship|Y
01|51731|1|1|Reference RGA# T-48130|Y
01|51731|1|2|5AX-130 s/n: NA|N
01|51744|1|1|This item is non-cancellable and non-returnable once|Y
01|51744|1|2|a purchase order has been issued.|Y
01|51755|9|1|This line is referenced at your NET cost|Y
01|51757|1|1|Reference RGA# Q-48016|Y
01|51757|1|2|CAT50U-NX5-151|N
01|51757|9|1|Labor is $110/hour. Price reflects 4.5 hours of labor.|Y
01|51757|9|2|Labor will be covered 100% as a courtesy.|Y
01|51784|9|1|This line is referenced at your NET cost|Y
01|51788|1|1|This line is referenced at your NET cost|Y
01|51815|1|1|Includes NSVZ180FA-M with Fanuc motor no external|Y
01|51815|1|2|cables are included hydraulic brake hydraulics need|Y
01|51815|1|3|to be provided|Y
01|51815|3|1|Includes drive unit bulkhead cables external cables|Y
01|51815|3|2|short bar fiber optic cable communications cable|Y
01|51815|3|3|parameter changes labor travel|Y
01|51823|4|1|Non-returnable and non-cancellable.|Y
01|51823|5|1|Non-cancellable and non-returnable|Y
01|51838|2|1|NO EXTERNAL CABLES NEEDED|Y
01|51849|2|1|Interface kit including drive unit external cables|Y
01|51849|2|2|bulkhead cables Fanuc fiber optic cables|Y
01|51863|1|1|Tables arriving the week of 6/20|Y
01|51870|2|1|THIS IS A SPECIAL ORDER PART.NON-RETURNABLE AND NON-|Y
01|51870|2|2|CANCELABLE UPON RECIEPT OF A PURCHASE ORDER|Y
01|51870|4|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51870|5|1|THIS ITEM IS NON RETURNABLE NON-CANCELLABLE|Y
01|51870|6|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51870|7|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51870|8|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABE|Y
01|51870|9|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51870|10|1|THIS ITEM IS NON-RETURNABLENON-CANCELLABLE|Y
01|51870|11|1|THIS ITEM IS NON-RETURNABLE NON-RETURNABLE|Y
01|51878|1|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51878|4|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51878|5|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51878|6|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51878|7|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51878|8|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51878|9|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51878|10|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51878|11|1|THIS ITEM IS NON-RETURNABLE NON-CANCELLABLE|Y
01|51888|1|1|Delivery is 4 weeks|Y
01|51889|1|1|2-CNCZ180LSABR tables with sheet metal divider drive|Y
01|51889|1|2|units junction box and cabinet cabling.|Y
01|51892|2|1|*4.00 gage length|Y
01|51892|4|1|*3.13 gage length|Y
01|51892|5|1|*5.00 gage length|Y
01|51892|6|1|*3.13 gage length|Y
01|51892|7|1|*5.50 gage length|Y
01|51902|2|1|*4.00 gage length|Y
01|51902|3|1|*5.90 gage length|Y
01|51902|4|1|*4.72 gage length|Y
01|51902|5|1|*5.90 gage length|Y
01|51902|6|1|*3.54 gage length|Y
01|51902|7|1|*4.72 gage length|Y
01|51906|1|1|Reference RGA# R-48151|Y
01|51906|1|2|T50U-C32-150S|N
01|51910|3|1|Free $1K value Tooling Certificate good for list price|Y
01|51910|3|2|tool holders.|Y
01|51920|1|1|100MM twin spindle high speed table with motor|Y
01|51920|1|2|Full 4th axis install Doosan DNM400II (Fanuc Oim)|Y
01|51921|9|1|DUE TO PALLET TYPE MACHINE CABLE WILL NEED TO BE|Y
01|51921|9|2|CONFIRMED FOR LENGTH. PRICE MAY CHANGE DUE TO THIS|Y
01|51935|3|1|Above holder to be Coolant Port modified prior to ship|Y
01|51935|5|1|Above holder to be Jet Slot modified prior to ship|Y
01|51935|7|1|Above holder to be Jet Slot modified prior to ship|Y
01|51935|9|1|Above holder to be Jet Slot modified prior to ship|Y
01|51935|11|1|Above holder to be Coolant Port modified prior to ship|Y
01|51946|1|1|Reference RGA# R-48149|Y
01|51946|1|2|1x PF-2|N
01|51948|1|1|Reference RGA# R-48160|Y
01|51948|1|2|1x PF-2|N
01|51957|21|1|5pcs ETA approx  5/23 ETA balance pending per factory|Y
01|51957|22|1|**Price is quoted as NET COST for this item.|Y
01|51957|23|1|**Price is quoted as NET COST for this item.|Y
01|51957|24|1|10pcs stk balance ETA 1-2 weeks|Y
01|51957|24|2|**Price is quoted as NET COST for this item.|Y
01|51967|3|1|INSTALLATION ON DMG/MORI ECCOMILL 1100|Y
01|51967|3|2|MACHINE MUST HAVE DDRT INTERFACE|Y
01|51970|1|1|HFO TO SUPPLY MOTORS AND CABLES|Y
01|51974|3|1|Above Holder to be coolant port modified prior to ship|Y
01|51974|5|1|Above Holder to be Jet Slot modified prior to ship|Y
01|51974|5|2|`|N
01|51974|7|1|Above Holder to be Jet Slot modified prior to ship|Y
01|51974|9|1|Above Holder to be Jet Slot modified prior to ship|Y
01|51974|12|1|Above Holder to be coolant port modified prior to ship|Y
01|52003|9|1|*use with TQW-SK06(18) attachment|Y
01|52005|1|1|Above holder to be Jet Slot modified prior to shipping.|Y
01|52005|1|2|Price is NET COST with Jet Slots.|Y
01|52019|2|1|Quoted for consideration|Y
01|52022|1|1|QUOTATION BASED ON DIRECT SALES TO DENSO|Y
01|52022|1|2|SAME AS SERIAL NUMBER 2189 WITHOUT MOTOR|Y
01|52022|1|3|DELIVERY 8-10WEEKS + SHIPPING|Y
01|52027|1|1|Reference RGA# R-48030|Y
01|52027|1|2|C40RA-0025M s/n: 4992814|N
01|52027|3|1|Bearings seals and o-rings are worn and must be|Y
01|52027|3|2|replaced.|Y
01|52033|4|1|This line at no charge for Baker's Dozen Promotion|Y
01|52038|1|1|Reference RGA# T-47688|Y
01|52038|1|2|CNC302FA-M s/n: 5092|N
01|52038|24|1|Set of external cables.|Y
01|52038|24|2|We recommend replacement due to coolant contamination.|Y
01|52042|2|1|Bearing/Seal/O-Ring Replacement Kit|Y
01|52042|2|2|For Part # OKL3-ER32X (OKU-L370-X)|Y
01|52042|4|1|Price Analysis for Lyndex-Nikken to do repair.|Y
01|52042|4|2|Bearings/Seals/O-rings + Labor -> Approx $975.00|Y
01|52042|4|3|Bearings/Seals/O-Rings/Gears + Labor -> Approx $1350|Y
01|52042|4|4|$150 Inspection fee only charged if repair is declined|Y
01|52048|1|1|HSK63F-GSK20C-120P|Y
01|52048|1|2|This item is non standard stock once a purchase order|Y
01|52048|1|3|is placed it cannot be cancelled or returned.|Y
01|52061|1|1|Reference RGA# R-48172|Y
01|52061|1|2|OKL4-ER40Z s/n: AL213|N
01|52061|3|1|Spindle and collet nut are worn and must be replaced.|Y
01|52061|3|2|Bearings seals and o-rings are worn and must also be|Y
01|52061|3|3|replaced. Labor is included.|Y
01|52065|1|1|Reference RGA# R-48134|Y
01|52065|1|2|OKL3-ER32Z-OFMS s/n: AL188|N
01|52065|3|1|Collet nuts are worn and must be replaced.|Y
01|52065|3|2|Bearings seals and o-rings are worn and must also be|Y
01|52065|3|3|replaced. Labor is included.|Y
01|52069|3|1|Installation includes:Drive unit short bar fiber|Y
01|52069|3|2|optic cable communications cable bulkhead cables|Y
01|52069|3|3|external cable parameter cables service time and|Y
01|52069|3|4|travel.|Y
01|52069|4|1|Installation kit:Drive unit short bar fiber|Y
01|52069|4|2|optic cable communications cables bulkhead cables|Y
01|52069|4|3|external cables.|Y
01|52098|1|1|BT40-SK16-90-J Coolant nuts installed at Lyndex Nikken|Y
01|52098|1|2|prior to shipping.|Y
01|52098|2|1|BT40-SK25-75-J Coolant nuts installed at Lyndex Nikken|Y
01|52098|2|2|prior to shipping.|Y
01|52098|3|1|BT40-SK25-90-J Coolant nuts installed at Lyndex Nikken|Y
01|52098|3|2|prior to shipping.|Y
01|52125|1|1|Reference RGA# R-48166|Y
01|52125|1|2|NC5-46-SK10C-75|N
01|52125|7|1|NC5-46-SK10C-75|N
01|52128|1|1|With PS-123-AIR Pull Stud|Y
01|52140|3|1|Includes: drive amp bulk head cable set external|Y
01|52140|3|2|cable set fiber optic cable communication cable|Y
01|52140|3|3|travel and labor for installation.|Y
01|52142|1|1|Discount based on quantity quoted|Y
01|52147|1|1|Nikken 10 Rotary table with Mitsubishi Motor.|Y
01|52147|1|7|c|N
01|52147|3|1|4th axis installation including Servo Drive connectors|Y
01|52147|3|2|inside wire harness machine internal cables parameter|Y
01|52147|3|3|travel labor all expenses.|Y
01|52147|3|4|Hardinge V1000 w/mitsubishi control|Y
01|52147|4|1|25 meter Power & Signal cable.  To be specified!|Y
01|52147|5|1|2.5 meter Feedback cable.  To be specified|Y
01|52147|7|1|NO CHARGE AS OFFER TO TIM DURING DISCUSSION|Y
01|52147|8|1|AS DISCUSSED WITH TIM|Y
01|52148|5|1|Includes: Axis drive bulkhead cable set external|Y
01|52148|5|2|cable set axis expansion card parameter changes|Y
01|52148|5|3|travel and labor for install on Samsung|Y
01|52158|1|1|MFG Completed 5/31|Y
01|52173|3|1|Discount reflects 1 piece.|Y
01|52173|4|1|Discount reflect 2 to 5 pieces.|Y
01|52173|5|1|Discount reflects 6 pieces|Y
01|52173|6|1|Wrench for HSK63A-SZF25C-135|Y
01|52173|9|1|Wrench for HSK63A-SK25C-135|Y
01|52173|11|2|Discount relects 1 piece.|Y
01|52173|12|1|Discount relects 2 to 5 pieces.|Y
01|52173|13|1|Discount reflects 6 to 10 pieces.|Y
01|52173|14|1|Wrench for HSK63A-SZF16C-150|Y
01|52179|2|1|Quoted at a net price|Y
01|52191|1|1|This line is referenced at your NET cost|Y
01|52196|1|1|Reference RGA# T-48176|Y
01|52196|1|2|NSVZ300 s/n: 2179H and Control Box|N
01|52205|2|1|Tool Number 1|Y
01|52205|3|1|Tool Number 1|Y
01|52205|5|1|Tool Number 2|Y
01|52205|6|1|Tool Number 2|Y
01|52205|8|1|Tool Number 3|Y
01|52205|9|1|Tool Number 3|Y
01|52205|10|1|Tool Number 4|Y
01|52205|12|1|Tool Number 4|Y
01|52205|13|1|Tool Number 4|Y
01|52205|14|1|Tool Number 5|Y
01|52205|17|1|Tool Number 5|Y
01|52205|18|1|Tool Number 5|Y
01|52205|19|1|Tool Number 6|Y
01|52205|21|1|Tool Number 6|Y
01|52205|22|1|Tool Number 6|Y
01|52205|26|1|Tool Number 8|Y
01|52205|27|1|Tool Number 8|Y
01|52205|28|1|Tool Number 8|Y
01|52205|29|1|Tool Number 8|Y
01|52205|30|1|Tool Number 9|Y
01|52205|32|1|Tool Number 9|Y
01|52205|33|1|Tool Number 9|Y
01|52205|36|1|Tool Number 10|Y
01|52205|37|1|Tool Number 10|Y
01|52205|38|1|Tool Number 12|Y
01|52205|40|1|Tool Number 12|Y
01|52205|41|1|Tool Number 15|Y
01|52205|43|1|Tool Number 15|Y
01|52205|44|1|Tool Number 21|Y
01|52205|45|1|Tool Number 21|Y
01|52205|47|1|Tool Number 21|Y
01|52205|48|1|Tool Number 25|Y
01|52205|50|1|Tool Number 25|Y
01|52205|51|1|Tool Number 25|Y
01|52205|52|1|Tool Number 27|Y
01|52205|54|1|Tool Number 27|Y
01|52205|55|1|Tool Number 27|Y
01|52205|56|1|Tool Number 28|Y
01|52205|58|1|Tool Number 28|Y
01|52205|59|1|Tool Number 28|Y
01|52205|60|1|Tool Number 29|Y
01|52205|62|1|Tool Number 29|Y
01|52205|63|1|Tool Number 29|Y
01|52205|64|1|Tool Number 32|Y
01|52205|67|1|Tool Number 32|Y
01|52205|68|1|Tool Number 32|Y
01|52205|69|1|Tool Number 33|Y
01|52205|71|1|Tool Number 33|Y
01|52205|72|1|Tool Number 33|Y
01|52205|73|1|Tool Number 34|Y
01|52205|75|1|Tool Number 34|Y
01|52205|76|1|Tool Number 34|Y
01|52205|77|1|Tool Number 35|Y
01|52205|78|1|Tool Number 35|Y
01|52205|79|1|Tool Number 35|Y
01|52205|80|1|Tool Number 36|Y
01|52205|82|1|Tool Number 36|Y
01|52205|83|1|Tool Number 36|Y
01|52205|84|1|Tool Number 38|Y
01|52205|85|1|Tool Number 38|Y
01|52205|86|1|Tool Number 38|Y
01|52209|4|1|INCLUDED NO CHARGE|Y
01|52209|6|1|INCLUDED NO CHARGE|Y
01|52209|8|1|included no charge|Y
01|52222|1|1|Table with Hydraulic Brakes|Y
01|52222|2|1|500PSI Unit and tank for table brake systems.|Y
01|52222|3|1|Installation Includes: drive amps bulk head cable set|Y
01|52222|3|2|external cable set parameter changes travel and|Y
01|52222|3|3|labor for installation of one 5AX-201FA-M table on a|Y
01|52222|3|4|Mori DV5100.|Y
01|52222|4|1|FREE $1K Tooling Certificate good for list price tool|Y
01|52222|4|2|holders.|Y
01|52223|1|1|Table with hydraulic brakes.|Y
01|52223|2|1|500PSI Unit and tank for table brake systems.|Y
01|52223|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|52223|3|2|external cables parameter changes travel and labor|Y
01|52223|3|3|for installation of one table on one new machine.|Y
01|52223|4|1|FREE $1K Tooling Certificate good for list price tool|Y
01|52223|4|2|holders.|Y
01|52224|1|1|only 6pcs. are in stock at this time for more|Y
01|52224|1|2|min. qty. order is 10pcs.|Y
01|52224|2|1|Net Price Each|Y
01|52224|2|2|Non-Cancelable & Non-Returnable|Y
01|52225|1|1|Tool Number 1|Y
01|52225|2|1|Tool Number 1|Y
01|52225|3|1|Tool Number 2|Y
01|52225|4|1|Tool Number 2|Y
01|52225|5|1|Tool Number 3|Y
01|52225|6|1|Tool Number 3|Y
01|52225|7|1|Tool Number 3|Y
01|52225|8|1|Tool Number 3|Y
01|52225|9|1|Tool Number 3|Y
01|52225|10|1|Tool Number 4|Y
01|52225|11|1|Tool Number 4|Y
01|52225|12|1|Tool Number 4|Y
01|52225|13|1|Tool Number 4|Y
01|52225|14|1|Tool Number 4|Y
01|52225|15|1|Tool Number 5|Y
01|52225|16|1|Tool Number 5|Y
01|52225|17|1|Tool Number 6|Y
01|52225|17|2|Nut swap to be completed before this product ships from|N
01|52225|17|3|Lyndex Nikken.|N
01|52225|18|1|Tool Number 6|Y
01|52225|19|1|Tool Number 6|Y
01|52225|20|1|Tool Number 6|Y
01|52225|21|1|Tool Number 6|Y
01|52225|22|1|Tool Number 6|Y
01|52225|23|1|Tool Number 6|Y
01|52225|24|1|Tool Number 7|Y
01|52225|24|2|Nut swap to be completed before nut this product ships|N
01|52225|24|3|from Lyndex Nikken|N
01|52225|25|1|Tool Number 7|Y
01|52225|26|1|Tool Number 7|Y
01|52225|27|1|Tool Number 7|Y
01|52225|28|1|Tool Number 7|Y
01|52225|29|1|Tool Number 7|Y
01|52225|30|1|Tool Number 7|Y
01|52225|31|1|Tool Number 8|Y
01|52225|32|1|Tool Number 8|Y
01|52225|33|1|Tool Number 8|Y
01|52225|34|1|Tool Number 8|Y
01|52225|35|1|Tool Number 8|Y
01|52225|36|1|Tool Number 9|Y
01|52225|37|1|Tool Number 9|Y
01|52225|38|1|Tool Number 9|Y
01|52225|39|1|Tool Number 9|Y
01|52225|40|1|Tool Number 9|Y
01|52225|41|1|Tool Number 10|Y
01|52225|42|1|Tool Number 10|Y
01|52225|43|1|Tool Number 10|Y
01|52225|44|1|Tool Number 10|Y
01|52225|45|1|Tool Number 10|Y
01|52225|46|1|Tool Number 11|Y
01|52225|47|1|Tool Number 11|Y
01|52225|48|1|Tool Number 11|Y
01|52225|49|1|Tool Number 11|Y
01|52225|50|1|Tool Number 11|Y
01|52225|51|1|Tool Number 12|Y
01|52225|52|1|Tool Number 12|Y
01|52225|53|1|Tool Number 12|Y
01|52225|54|1|Tool Number 12|Y
01|52225|55|1|Tool Number 12|Y
01|52225|56|1|Tool Number 13|Y
01|52225|57|1|Tool Number 13|Y
01|52225|58|1|Tool Number 13|Y
01|52225|59|1|Tool Number 13|Y
01|52225|60|1|Tool Number 13|Y
01|52225|61|1|Tool Number 14|Y
01|52225|62|1|Tool Number 14|Y
01|52225|63|1|Tool Number 14|Y
01|52225|64|1|Tool Number 14|Y
01|52225|65|1|Tool Number 14|Y
01|52225|66|1|Tool Number 15|Y
01|52225|66|2|Tool swap must be completed before this product ships|N
01|52225|66|3|from Lyndex Nikken|N
01|52225|67|1|Tool Number 15|Y
01|52225|68|1|Tool Number 15|Y
01|52225|69|1|Tool Number 15|Y
01|52225|70|1|Tool Number 15|Y
01|52225|71|1|Tool Number 15|Y
01|52225|72|1|Tool Number 15|Y
01|52225|73|1|Tool Number 16|Y
01|52225|73|2|Nut swap to be completed before this product ships from|N
01|52225|73|3|Lyndex Nikken|N
01|52225|74|1|Tool Number 16|Y
01|52225|75|1|Tool Number 16|Y
01|52225|76|1|Tool Number 16|Y
01|52225|77|1|Tool Number 16|Y
01|52225|78|1|Tool Number 16|Y
01|52225|79|1|Tool Number 17|Y
01|52225|79|2|Nut swap to be completed before this product ships from|N
01|52225|79|3|Lyndex Nikken|N
01|52225|80|1|Tool Number 17|Y
01|52225|81|1|Tool Number 17|Y
01|52225|82|1|Tool Number 17|Y
01|52225|83|1|Tool Number 17|Y
01|52225|84|1|Tool Number 17|Y
01|52225|85|1|Tool Number 18|Y
01|52225|86|1|Tool Number 18|Y
01|52225|87|1|Tool Number 18|Y
01|52225|88|1|Tool Number 18|Y
01|52225|89|1|Tool Number 18|Y
01|52225|90|1|Tool Number 19|Y
01|52225|91|1|Tool Number 19|Y
01|52225|92|1|Tool Number 19|Y
01|52225|93|1|Tool Number 19|Y
01|52225|94|1|Tool Number 19|Y
01|52225|95|1|Tool Number 20|Y
01|52225|96|1|Tool Number 20|Y
01|52225|97|1|Tool Number 20|Y
01|52225|98|1|Tool Number 20|Y
01|52225|99|1|Tool Number 20|Y
01|52225|100|1|Tool Number 21|Y
01|52225|101|1|Tool Number 21|Y
01|52225|102|1|Tool Number 21|Y
01|52225|103|1|Tool Number 21|Y
01|52225|104|1|Tool Number 21|Y
01|52225|105|1|Tool Number 22|Y
01|52225|106|1|Tool Number 22|Y
01|52225|107|1|Tool Number 22|Y
01|52225|108|1|Tool Number 22|Y
01|52225|109|1|Tool Number 22|Y
01|52225|110|1|Tool Number 23|Y
01|52225|111|1|Tool Number 23|Y
01|52225|112|1|Tool Number 23|Y
01|52225|113|1|Tool Number 23|Y
01|52225|114|1|Tool Number 23|Y
01|52232|1|1|Discount reflects quantities of 1 to 5 tools.|Y
01|52232|2|1|Discount reflects quantities of 6+ tools.|Y
01|52232|3|1|Discount reflects quantities of 1 to 5 tools.|Y
01|52232|4|1|Discount reflects quantities of 6+ tools|Y
01|52232|4|2|Del: 2pcs stock/1pc 3-4 weeks/Bal 6 to 7 weeks but I|Y
01|52232|4|3|think we can improve delivery. Will advise if customer|Y
01|52232|4|4|places order soon.|Y
01|52236|1|1|Tool Number 1|Y
01|52236|2|1|Tool Number 1|Y
01|52236|3|1|Tool Number 2|Y
01|52236|4|1|Tool Number 2|Y
01|52236|5|1|Tool Number 3|Y
01|52236|6|1|Tool Number 3|Y
01|52236|7|1|Tool Number 3|Y
01|52236|8|1|Tool Number 3|Y
01|52236|9|1|Tool Number 3|Y
01|52236|10|1|Tool Number 4|Y
01|52236|11|1|Tool Number 4|Y
01|52236|12|1|Tool Number 4|Y
01|52236|13|1|Tool Number 4|Y
01|52236|14|1|Tool Number 4|Y
01|52236|15|1|Tool Number 5|Y
01|52236|16|1|Tool Number 5|Y
01|52236|17|1|Tool Number 6|Y
01|52236|18|1|Tool Number 6|Y
01|52236|19|1|Tool Number 6|Y
01|52236|20|1|Tool Number 6|Y
01|52236|21|1|Tool Number 6|Y
01|52236|22|1|Tool Number 6|Y
01|52236|23|1|Tool Number 7|Y
01|52236|24|1|Tool Number 7|Y
01|52236|25|1|Tool Number 7|Y
01|52236|26|1|Tool Number 7|Y
01|52236|27|1|Tool Number 7|Y
01|52236|28|1|Tool Number 7|Y
01|52236|29|1|Tool Number 8|Y
01|52236|30|1|Tool Number 8|Y
01|52236|31|1|Tool Number 8|Y
01|52236|32|1|Tool Number 8|Y
01|52236|33|1|Tool Number 8|Y
01|52236|34|1|Tool Number 9|Y
01|52236|35|1|Tool Number 9|Y
01|52236|36|1|Tool Number 9|Y
01|52236|37|1|Tool Number 9|Y
01|52236|38|1|Tool Number 9|Y
01|52236|39|1|Tool Number 10|Y
01|52236|40|1|Tool Number 10|Y
01|52236|41|1|Tool Number 10|Y
01|52236|42|1|Tool Number 10|Y
01|52236|43|1|Tool Number 10|Y
01|52236|44|1|Tool Number 11|Y
01|52236|45|1|Tool Number 11|Y
01|52236|46|1|Tool Number 11|Y
01|52236|47|1|Tool Number 11|Y
01|52236|48|1|Tool Number 11|Y
01|52236|49|1|Tool Number 12|Y
01|52236|50|1|Tool Number 12|Y
01|52236|51|1|Tool Number 12|Y
01|52236|52|1|Tool Number 12|Y
01|52236|53|1|Tool Number 12|Y
01|52236|54|1|Tool Number 13|Y
01|52236|55|1|Tool Number 13|Y
01|52236|56|1|Tool Number 13|Y
01|52236|57|1|Tool Number 13|Y
01|52236|58|1|Tool Number 13|Y
01|52236|59|1|Tool Number 14|Y
01|52236|60|1|Tool Number 14|Y
01|52236|61|1|Tool Number 14|Y
01|52236|62|1|Tool Number 14|Y
01|52236|63|1|Tool Number 14|Y
01|52236|64|1|Tool Number 15|Y
01|52236|65|1|Tool Number 15|Y
01|52236|66|1|Tool Number 15|Y
01|52236|67|1|Tool Number 15|Y
01|52236|68|1|Tool Number 15|Y
01|52236|69|1|Tool Number 15|Y
01|52236|70|1|Tool Number 16|Y
01|52236|71|1|Tool Number 16|Y
01|52236|71|2|NOTE:No coolant collet available in this size.|Y
01|52236|72|1|Tool Number 16|Y
01|52236|73|1|Tool Number 16|Y
01|52236|74|1|Tool Number 16|Y
01|52236|75|1|Tool Number 17|Y
01|52236|76|1|Tool Number 17|Y
01|52236|76|2|NOTE: No coolant collet available in this size|Y
01|52236|77|1|Tool Number 17|Y
01|52236|78|1|Tool Number 17|Y
01|52236|79|1|Tool Number 17|Y
01|52236|80|1|Tool Number 18|Y
01|52236|81|1|Tool Number 18|Y
01|52236|82|1|Tool Number 18|Y
01|52236|83|1|Tool Number 18|Y
01|52236|84|1|Tool Number 18|Y
01|52236|85|1|Tool Number 18|Y
01|52236|86|1|Tool Number 19|Y
01|52236|87|1|Tool Number 19|Y
01|52236|88|1|Tool Number 19|Y
01|52236|89|1|Tool Number 19|Y
01|52236|90|1|Tool Number 19|Y
01|52236|91|1|Tool Number 20|Y
01|52236|92|1|Tool Number 20|Y
01|52236|93|1|Tool Number 20|Y
01|52236|94|1|Tool Number 20|Y
01|52236|95|1|Tool Number 20|Y
01|52236|96|1|Tool Number 21|Y
01|52236|97|1|Tool Number 21|Y
01|52236|98|1|Tool Number 21|Y
01|52236|99|1|Tool Number 21|Y
01|52236|100|1|Tool Number 21|Y
01|52236|101|1|Tool Number 22|Y
01|52236|102|1|Tool Number 22|Y
01|52236|103|1|Tool Number 22|Y
01|52236|104|1|Tool Number 22|Y
01|52236|105|1|Tool Number 22|Y
01|52236|106|1|Tool Number 23|Y
01|52236|107|1|Tool Number 23|Y
01|52236|108|1|Tool Number 23|Y
01|52236|109|1|Tool Number 23|Y
01|52236|110|1|Tool Number 23|Y
01|52247|1|1|Price reflects NET charge|Y
01|52251|1|1|Discount based on 5 pieces.|Y
01|52265|1|1|H09M12 >>> Special 4 Jaw Power Chuck|Y
01|52265|3|1|PC-CHK-ADAPTER-KS15-A28>>>12/15Adapter plate for A2-8|Y
01|52265|3|2|spindle.|Y
01|52281|2|1|Installed on NC5-46-SK10C-75 at factory|Y
01|52284|1|1|Net price reflects 1 unit and BT40 Pot.|Y
01|52284|1|2|Warranty 30 days from time of sale.|Y
01|52291|2|1|**DIN - coolant through the flange|Y
01|52291|2|2|**Hi-Speed|Y
01|52291|4|1|*standard speed|Y
01|52291|5|1|*standard speed|Y
01|52291|14|1|*for Hi-Speed holders|Y
01|52307|1|1|Net Price Each|Y
01|52307|1|2|Non-Cancelable & Non-Returnable|Y
01|52313|8|1|included no charge|Y
01|52315|27|1|Price and delivery pending from factory.|Y
01|52336|1|1|Motor Gear for CNC260MA with HF-H104T-A48 Motor|Y
01|52337|1|1|Includes: 200MM rotary table Nikken AA21 controller|Y
01|52337|1|2|power cable external cables pendant & M-code cable|Y
01|52337|2|1|Installation includes: M-code connection mounting|Y
01|52337|2|2|controller boxes cable management and RS232 connection|Y
01|52344|1|1|This tool is a non standard stock item once a purchase|Y
01|52344|1|2|order has been placed it cannot be cancelled or|Y
01|52344|1|3|returned.|Y
01|52368|5|1|Bearing/Seals/O-Ring Kit for MNZ20-ER11(X)-SUB-SP|Y
01|52374|1|1|ETA awaiting information from factory|Y
01|52394|1|1|Custom block made by Lyndex-Nikken.|Y
01|52394|2|1|Generic block including bushing (to be modified by|Y
01|52394|2|2|customer).|Y
01|52394|3|1|Bushing (to be added to a piece of material by customer|Y
01|52397|1|1|MUST CONFIRM PROPER FIT ON MACHINE|Y
01|52397|6|1|MUST CONFIRM PROPER FIT ON MACHINE|Y
01|52397|11|1|NOTE THIS IS A 1 PC PRICE EACH|Y
01|52397|11|2|EITHER NEED 2 OR 4 DETERMINED BY TABLE|Y
01|52422|1|1|Non-Refundable and Non-Cancellable.|Y
01|52422|1|2|Quoted at Net price|Y
01|52437|1|1|Reference RGA# R-48178|Y
01|52437|1|2|MZQT47-ER32Z-MS s/n: 71408 02|N
01|52437|3|1|Bearings seals and o-rings must be replaced. Labor is|Y
01|52437|3|2|included.|Y
01|52451|10|1|Don't carry O-Ring sealed 3mm cap. Can machine own with|Y
01|52451|10|2|this blank|Y
01|52460|5|1|Price includes Balluf Chip #BIS0011 hole being cut in|Y
01|52460|5|2|at Lyndex-Nikken before shipping. End User to install|Y
01|52460|5|3|chips themselves.|Y
01|52473|9|1|WILL INCLUDE IF lYNDEEX nIKKEN DOES INSTALLATION|Y
01|52473|11|1|INCLUDES SERVO MOTOR AMPLIFIER WIRE HARNESS ALL|Y
01|52473|11|2|CONNECTORS LABOR TRAVLE|Y
01|52484|1|1|Reference RGA# R-48175|Y
01|52484|1|2|OKL3-ER32X s/n: AL1143|N
01|52484|3|1|Clutch gears and spindle shafts must be replaced.|Y
01|52484|3|2|Bearings seals and o-rings are worn and must be|Y
01|52484|3|3|replaced. Labor is included.|Y
01|52485|5|1|With SKN-16BJ coolant installed|Y
01|52515|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|52515|4|2|holders.|Y
01|52515|5|1|Installation Kit Includes: Drive amp bulkhead cable|Y
01|52515|5|2|set external cables communication cables.|Y
01|52515|5|3|Gosiger to perfrom installation of all components.|Y
01|52527|2|1|Expedited DIN modification of above holder.|Y
01|52527|6|1|Expedited DIN modification FEE ONLY for customers|Y
01|52527|6|2|existing holder.|Y
01|52531|4|1|Installed on HSK63A-SK6C-150P|Y
01|52531|6|1|Installed on HSK63A-SK10C-150P|Y
01|52531|9|1|Installed on HSK63A-SK16C-120P & HSK63A-SK16C-150P|Y
01|52531|11|1|Installed on HSK63A-SK25C-135P|Y
01|52531|12|1|Swap Standard SK Nut for Coolant Nut|Y
01|52534|1|1|This includes the unit both side racks a spring clip|Y
01|52534|1|2|kit and one set of taper pots.|Y
01|52537|1|1|1-CNCZ180LSABR2 rotary table with cabling for 2-tables|Y
01|52543|5|1|HSK50A-SK13-105P  SK13 High Speed Slim Chuck|Y
01|52543|7|1|Part Number:HSK50A-SK13-105|Y
01|52548|1|1|BT50-SKS25-105-SP|Y
01|52548|3|1|BT50-SKS16-105SP|Y
01|52548|5|1|BT50-SK10-105-SP|Y
01|52556|27|1|Price and delivery pending from factory.|Y
01|52566|1|1|HSK63A-(80)-SF0625-3.375ID Release 07/25/2016|Y
01|52566|1|2|Chip Hole Only/No balance screws required.|Y
01|52566|1|3|G2.5 to 15000 RPM UNV#201|Y
01|52579|2|1|TAILSTOCK COMPATABLE WITH CNC-260|Y
01|52579|5|1|TAILSTOCK COMPATABLE WITH CNC-202|Y
01|52579|7|1|INSTALLATION INCLUDES DRIVE WIRE HARNESS CABLE FROM|Y
01|52579|7|2|SERVO TO BULKHEAD LABOR TRAVEL TRAINING|Y
01|52579|11|1|6 PCS GENERIC TOOLING(CAT 40 ER COLLET CHUCKS)|Y
01|52579|11|2|WITH PULLSTUDS|Y
01|52581|4|1|IntC Coolant (1000 PSI) - *Special seals allow to|Y
01|52581|4|2|also run DRY 24/7*|Y
01|52584|2|1|Installation Includes: Drive amp bulk head cable set|Y
01|52584|2|2|external cable set communication cable parameter|Y
01|52584|2|3|changes travel and labor for installation of one 5AX|Y
01|52584|2|4|table on one new VMC.|Y
01|52584|3|1|FREE $1K Tooling Certificate with purchase of table|Y
01|52584|3|2|good for list price tool holders.|Y
01|52595|2|1|UNFORTUNATELY WE DO NOT OFFER A PROMOTIONAL TAILSTOCK|Y
01|52595|2|2|FOR THIS MODEL. IF CUSTOMER WANTS TO MAKE A SUBPLATE|Y
01|52595|2|3|TO RAISE THE CNC-105 (30MM) THEN WE CAN OFFER MT-135|Y
01|52595|2|4|AT NO CHARGE AS PROMOTION|Y
01|52595|4|1|NO CHARGE FOR CHUCK AND ADAPTER|Y
01|52595|9|1|WILL INCLUDE IF lYNDEEX nIKKEN DOES INSTALLATION|Y
01|52595|11|1|INCLUDES SERVO MOTOR AMPLIFIER WIRE HARNESS ALL|Y
01|52595|11|2|CONNECTORS LABOR TRAVLE|Y
01|52603|4|1|IntC Coolant (1000 PSI) - *Special seals allow to|Y
01|52603|4|2|also run DRY 24/7*|Y
01|52606|1|1|Reference RGA# R-48174|Y
01|52606|1|2|C40RAM-ER16-180 s/n: 18473 01|N
01|52606|3|1|Bearings seals and o-rings are worn and must be|Y
01|52606|3|2|replaced. Spindle is damaged and must be replaced.|Y
01|52606|3|3|Labor is included.|Y
01|52655|1|1|Quoted at a net price|Y
01|52655|1|2|Non-returnable and non-cancellable.|Y
01|52663|1|1|NCAT50-C2-125U  Milling Chuck CAT50 Taper Plus|Y
01|52663|1|2|2.0 x 125mm gage length|Y
01|52663|10|1|CAT50-C1.1/4-165U Milling Chuck CAT50 Taper Plus|Y
01|52663|10|2|1.1/4 X 165mm|Y
01|52665|5|1|INSTALLATION ON DMG/MORI DURA VERTICAL|Y
01|52665|5|2|MACHINE MUST HAVE DDRT INTERFACE|Y
01|52665|5|3|IF NOT COST WILL BE $ 8500|Y
01|52679|13|1|INCLUDES 4TH AXIS DRIVE UNIT FIBER OPTICS CONNECTORS|Y
01|52679|13|2|WIRE HARNESS PARAMETERS SERVO MOTOR|Y
01|52679|13|3|NEED MACHINE INFO AND DATA SHEETS|Y
01|52679|14|1|INCLUDES TRAVEL AND LABOR COST FROM ILLINOIS|Y
01|52682|1|1|Consignment|Y
01|52682|2|1|Consignment|Y
01|52682|3|1|Consignment|Y
01|52696|4|1|This line is referenced at your NET cost.|Y
01|52705|5|1|TAILSTOCK COMPATABLE WITH CNC-202|Y
01|52705|7|1|INSTALLATION INCLUDES DRIVE WIRE HARNESS CABLE FROM|Y
01|52705|7|2|SERVO TO BULKHEAD LABOR TRAVEL TRAINING|Y
01|52720|1|1|MZST68-OD10X-MS /Mimatic #177078|Y
01|52720|1|2|1.0 OD  Holder for Mazak QTS 200M|Y
01|52721|9|1|15pcs ETA 1-2 weeks /Balance ETA aprox 13 weeks|Y
01|52726|1|1|THIS TABLE ID RIGHT HAND VERSION AS SEEN ON CATALOG|Y
01|52726|1|2|PAGE ATTACHED. LEFT HAND VERSION AVAILABLE|Y
01|52726|1|3|jEFFREYS TO SUPPLY MOTOR AND CABLES FOR LYNDEX NIKKEN|Y
01|52726|1|4|TO MOUNT|Y
01|52726|1|5|CONFIRMATION OF PROPER FIT TO MACHINE MUST BE VERIFIED|Y
01|52732|1|1|*Modified holder with JET SLOTS|Y
01|52732|1|2|*Holder is not DIN (std holder - coolant thru center)|Y
01|52739|1|1|Price break above is for 1-50 pieces|Y
01|52739|2|1|Price break above is for 51-100 pieces|Y
01|52739|3|1|Price break above is for 101-150 pieces|Y
01|52739|4|1|Price break above is for 151-200 pieces|Y
01|52750|9|1|for Haas VF Machines|Y
01|52751|1|1|Price break above is for 1-50 pieces|Y
01|52751|2|1|Price break above is for 51-100 pieces|Y
01|52751|3|1|Price break above is for 101-150 pieces|Y
01|52751|4|1|Price break above is for 151-200 pieces|Y
01|52754|1|1|Remaining balance(7pcs) ETA 10-12WK|Y
01|52755|1|1|Non cancelable & Non Returnable|Y
01|52786|2|1|500psi unit and tank for table brake systems.|Y
01|52786|3|1|Installation Includes: drive amp change new bulk head|Y
01|52786|3|2|cable sets external cables communication cable|Y
01|52786|3|3|parameter changes travel and labor for installation|Y
01|52786|3|4|of one 5AX table on one NVX5100 VMC.|Y
01|52790|2|1|Quoted at a net price.|Y
01|52792|1|1|Reference RGA# T-48260|Y
01|52792|1|2|CNC180FA-M s/n: 7888|N
01|52792|26|1|Expedite Fee for 3 business day repair.|Y
01|52792|26|2|Estimated completion: 6/9/16|Y
01|52792|26|3|Normal delivery is 1-2 weeks.|Y
01|52793|2|1|Installation for 5AX Direct Drive table on MORI Fanuc|Y
01|52793|2|2|machine with travel and labor included.|Y
01|52802|2|1|Tailstocks to match rotary table center height and|Y
01|52802|2|2|spacing.|Y
01|52802|3|1|Manual Hand Lever for actuating tailstocks and collet|Y
01|52802|3|2|closers.|Y
01|52802|4|1|This price includes air cylinder drawbar 5C fixture.|Y
01|52802|4|2|Everything needed except the 5C collet.|Y
01|52802|5|1|Installation Includes: Drive amp bulkhead cable set|Y
01|52802|5|2|external cable set communication cable parameter|Y
01|52802|5|3|changes travel and labor for installation of one|Y
01|52802|5|4|table on one VMC.|Y
01|52807|1|1|ETA 10 Weeks|Y
01|52807|2|1|STK 1 PC Balance ETA 3 WEEKS|Y
01|52817|2|1|500psi unit and tank for table braking systems.|Y
01|52817|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|52817|3|2|external cable set communication cable parameter|Y
01|52817|3|3|changes travel and labor for installation of one|Y
01|52817|3|4|table on one machine.|Y
01|52820|1|1|CAT40 Adjustable Angle Head - ER25 - External Coolant|Y
01|52820|2|1|Positioning block to be designed and made by LN.|Y
01|52820|2|2|Customer to provide spindle drawing for block design.|Y
01|52824|1|1|Table with Okuma motor.|Y
01|52824|2|1|FREE $1K Tooling Certificate with purchase of table|Y
01|52824|2|2|good for list price tool holders.|Y
01|52824|3|1|FREE Extended Warranty 1 Year (2 Years Total Warranty)|Y
01|52853|1|1|Reference RGA# R-48225|Y
01|52853|1|2|#1 CAT40-NPU8-80U|N
01|52853|5|1|Reference RGA# R-48225|Y
01|52853|5|2|#2 CAT40-NPU8-80U|N
01|52857|1|1|4pcs Stock - 10pcs = 2 wks & 16 pcs  = 6 weeks|Y
01|52871|1|1|230mm (9.05) gage length|Y
01|52871|1|2|*Nut Diameter 1.083|Y
01|52871|1|3|*Quoted at Net price|Y
01|52876|1|1|Quoted as alternative option for B5016-0375-6.00|Y
01|52876|2|1|3PC Minimum order|Y
01|52885|1|1|Modify with Jet Slots on customer's existing|Y
01|52885|1|2|C4006-0125-2.36DIN|Y
01|52885|3|1|Modify with Jet Slots on customer's existing|Y
01|52885|3|2|C4016-0125-4.00DIN|Y
01|52891|1|1|Reference RGA# T-48193|Y
01|52891|1|2|P-125S|N
01|52929|2|1|Special oblong junction box with cable set and drive|Y
01|52929|2|2|unit|Y
01|52930|1|1|CAT45 ER20 Collet Chuck 4.00 G.L w E20-NUT-MINI|Y
01|52931|3|1|8pcs stock at factory 2 pcs. ETA approx 12 weeks|Y
01|52937|2|1|HFO TO SUPPLY MOTORS AND CABLES FOR BOTH AXIS|Y
01|52940|1|1|External Cables for CNC180FA-M|Y
01|52940|3|1|Tube of Dielectric Grease|Y
01|52941|1|2|HFO Tampa to supply correct motors|Y
01|52941|1|3|HFO Tampa to supply cables|Y
01|52948|1|1|CAT40 45 Degree Fixed Angle Head|Y
01|52948|2|1|CAT40 Degree Fixed Angle Head|Y
01|52964|2|1|From Slightly Used Inventory|Y
01|52969|1|1|Add Coolant Nut SKN-16BJ|Y
01|52974|96|1|Torque wrench for tightening tool holders|Y
01|52974|97|1|Torque wrench attachment for SK16 collet chuck|Y
01|52974|98|1|Torque wrench attachment for 3/4 Milling Chuck|Y
01|52983|3|1|SKL-25|Y
01|53014|1|1|Special Net Price Each|Y
01|53014|2|1|Special Net Price|Y
01|53014|3|1|Special Net Price|Y
01|53014|4|1|Special Net Price|Y
01|53014|5|1|Special Net price|Y
01|53015|1|1|Reference RGA# R-48051|Y
01|53015|1|2|C40RAM-ER32-180-65FP s/n: 31400 03|N
01|53015|3|1|Bearings seals and o-rings must be replaced.|Y
01|53015|3|2|Spindles need to be resurfaced. Labor is included.|Y
01|53050|1|2|HFO Tampa to supply correct motors|Y
01|53050|1|3|HFO Tampa to supply cables|Y
01|53054|4|1|With Core Trade In|Y
01|53054|5|1|With Core Trade In|Y
01|53058|1|1|Reference RGA# R-48247|Y
01|53058|1|2|C40RA-0025 s/n: NA|N
01|53060|1|1|Table with Okuma motors and Air Braks.|Y
01|53060|2|1|FREE $1K Tooling Certificate with purchase of table|Y
01|53060|2|2|good for list price tool holders.|Y
01|53060|3|1|FREE Extended Warranty 1 Year (2 years total warranty)|Y
01|53062|1|1|Balance in 1-2 weeks|Y
01|53063|1|1|Balance in 1-2 weeks|Y
01|53104|3|1|SPECIAL PRICE PER LIVE TOOL CORE TRADE IN|Y
01|53124|17|1|To be assembled with CAT40-SF-0750-3.15|Y
01|53124|18|1|To be assembled with E11-EXT-750|Y
01|53127|7|1|Above item will be supplied by customer|Y
01|53143|2|1|Installation includes: Drive unitshort bar fiber|Y
01|53143|2|2|optic cablebulkhead cables external cables parameter|Y
01|53143|2|3|changes service time and travel.|Y
01|53145|1|1|DELIVERY 5-6 WEEKS ARO|Y
01|53145|3|1|DELIVERY 5-6 WEEKS ARO|Y
01|53147|1|1|HFO TO SUPPLY MOTORS AND CABLES|Y
01|53148|1|1|HFO TO SUPPLY MOTORS AND CABLES|Y
01|53158|2|1|Special Promo Price with Purchase of Matching Holder|Y
01|53172|29|1|*net pricing|Y
01|53186|5|1|Price includes Balluf Chip #BIS0011 hole being cut in|Y
01|53186|5|2|at Lyndex-Nikken before shipping. End User to install|Y
01|53186|5|3|chips themselves.|Y
01|53186|6|1|Only 1pc available at factory any balance over will be|Y
01|53186|6|2|aprox 13 weeks for delivery.|Y
01|53186|6|3|Price includes Balluf Chip #BIS0011 hole being cut in|Y
01|53186|6|4|at Lyndex-Nikken before shipping. End User to install|Y
01|53186|6|5|chips themselves.|Y
01|53186|11|1|7 in stock at Nikken|N
01|53191|1|1|Non-Standard Stock. Non-returnable non-cancellable|Y
01|53204|1|1|Custom Positioning Block per details from Mitsui-Seiki|Y
01|53204|1|2|to Tim Reeves. Signed drawing has been received from|Y
01|53204|1|3|Yuho Oishi of Mitsui-Seiki.|Y
01|53216|1|1|Reference# G|Y
01|53216|2|1|Reference# H|Y
01|53247|1|1|Reference RGA# R-47759|Y
01|53247|1|2|B40RAM-ER32-187 s/n: 61550 01|N
01|53247|3|1|Bearings seals and o-rings must be replaced. Spindles|Y
01|53247|3|2|must be resurfaced as needed. Labor is included.|Y
01|53247|3|3|Additional 15% discount per Tim Reeves.|Y
01|53256|1|1|with installed PS-123-AIR at factory|Y
01|53256|2|1|Retention Knob installed on NC5-46-SK10C-75|Y
01|53257|1|1|17pcs. stock remaining balance ETA approx 6/17/2016|Y
01|53264|2|1|*net price|Y
01|53264|2|2|For Mazak MTV-815|Y
01|53264|7|1|*net price|Y
01|53264|7|2|For Mazak MTV-815|Y
01|53270|1|1|HSK63A(80)-ER40-100-IDI|Y
01|53270|2|1|HSK63A(80)-ER32-100-IDI|Y
01|53283|1|1|Net Price|Y
01|53283|2|1|Net Price|Y
01|53283|3|1|Net Price|Y
01|53283|4|1|Net Price|Y
01|53283|5|1|Net Price|Y
01|53283|6|1|Net Price|Y
01|53298|1|1|HW-12C-OS-R1466 Howa Power Chuck for Okuma 2SPV40|Y
01|53298|2|1|Soft Jaws for above Chuck - 3pcs needed per Chuck|Y
01|53312|1|1|Custom block made by Lyndex-Nikken.|Y
01|53316|2|1|Installtion includes: Dual axis drive unit short bar|Y
01|53316|2|2|fiber optic cables communications cable bulkhead|Y
01|53316|2|3|cables external cables parameter changes service|Y
01|53316|2|4|time and travel.|Y
01|53317|1|1|130MM twin spindle table with 170MM pitch|Y
01|53317|1|2|Backhand mounted motor and risers for greater tilt|Y
01|53317|1|3|Change the tilting range from -30 to +140 degrees|Y
01|53318|1|1|Table with Mazak motor - Lefty|Y
01|53318|2|1|Booster for hydraulic brake|Y
01|53332|6|1|INSTALLATION INCLUDE DRIVE CABLES BOTH INTERNAL|Y
01|53332|6|2|AND EXTERNAL. CONNECTORSFIBER OPTIC CABLES TRAVEL|Y
01|53332|6|3|AND LABOR. FANUC DATA SHEETS REQUIRED|Y
01|53332|7|1|FOR SECOND MACHINE AT FACILITY|Y
01|53348|4|1|Non-Cancelable & Non-Returnable|Y
01|53357|1|1|Reference RGA# T-48242|Y
01|53357|1|2|CNC401FA s/n: NA|N
01|53368|1|1|Reference RGA# T-48235|Y
01|53368|1|2|5AX-350FA-R36 s/n: 3526|N
01|53385|5|1|Custom Positioning Block for Mazak Nexus 510C|Y
01|53385|5|2|End User to move anglehead between his Haas and Mazak|Y
01|53385|5|3|machines. Will need 2 different blocks to accommodate.|Y
01|53391|1|1|Reference RGA# R-48211|Y
01|53391|1|2|OKL3-ER32X s/n: AL1110|N
01|53391|3|1|Clutch is worn and must be replaced.|Y
01|53391|3|2|Spindle shaft cannot rotate due to damaged gears these|Y
01|53391|3|3|must be replaced. Bearings seals o-rings and collet|Y
01|53391|3|4|nut must be replaced. Labor is included.|Y
01|53395|1|1|Reference RGA# R-46839|Y
01|53395|1|2|OKL3-ER32Z-OFS s/n: AL010|N
01|53395|3|1|Collet nut bearings seals and o-rings are worn and|Y
01|53395|3|2|must be replaced. Labor is included.|Y
01|53414|1|1|Quoted at a NET price|Y
01|53414|4|1|Quoted at a NET price.|Y
01|53455|4|1|CAT40 ER20 Collet Chuck 4.0 gage length|Y
01|53455|4|2|Hot Deal holder is non-returnable once a purchase order|Y
01|53455|4|3|is placed.|Y
01|53485|1|1|HSK63A(80)-ER40-100-IDI|Y
01|53485|2|1|HSK63A(80)-ER32-100-IDI|Y
01|53491|3|1|INSTALLATION INCLUDES 4TH AND 5TH AXIS DRIVES|Y
01|53491|3|2|ALL INNER AND EXTERNAL CABLES CONNECTORS|Y
01|53491|3|3|FIBER OPTIC CABLES PARAMETERS TRAVEL LABOR|Y
01|53491|3|4|MACHINE INFORMATION WILL BE NEEDED ON CONTROL|Y
01|53491|3|5|DATA SHEETS. TO DETERMINE IF MACHINE IS 5 AXIS CAPABLE|Y
01|53491|3|6|POSSIBLE NEED TO HAVE FANUC ADD PARAMETER NEEDDED|Y
01|53492|1|1|THIS TABLE TO BE CONFIGURED FOR HAAS|Y
01|53492|1|2|NO INSTALLATION INCLUDED. APPLIED TO BE RESPONSIBLE|Y
01|53492|1|3|MACHINE MUST HAVE 4TH AND 5TH AXIS INSTALED|Y
01|53492|1|4|LYNDEX NIKKEN WILL SUPPLY TABLE WITH CORRECT MOTORS|Y
01|53492|1|5|AND CABLES AND PARAMETERS|Y
01|53493|3|1|Using these holders to replace 5/8 SF and 3/4 SF.  Will|Y
01|53493|3|2|need approx 14 for 5/8 and 10 for 3/4.|Y
01|53500|3|1|1pc only in stock on this item|Y
01|53510|1|1|Please note: This toll is non standard stock once|Y
01|53510|1|2|a purchase order is placed it cannot be cancelled or|Y
01|53510|1|3|returned.|Y
01|53512|3|1|*2pc pricing|Y
01|53514|2|1|Used Tool>>> Never had tool inserted in holder.|Y
01|53514|2|2|Witness marks on holder.|Y
01|53514|2|3|Net price reflects non-returnable tool.|Y
01|53534|6|1|Discount reflects Core Trade In|Y
01|53534|7|1|Discount reflects Core Trade In|Y
01|53534|8|1|Discount reflects Core Trade In|Y
01|53534|9|1|Discount reflects Core Trade In|Y
01|53545|1|1|Pricing reflects shrink fit package. Please choose|Y
01|53545|1|2|10 holders from list.|Y
01|53545|3|1|Unit Only Pricing|Y
01|53559|4|1|*Special Pricing for SK6 version|Y
01|53567|1|1|This is the non-coolant option.|Y
01|53567|2|1|This is the internal coolant option.|Y
01|53567|3|1|Custom Positioning Block per specs provided by End User|Y
01|53567|3|2|to Tim Reeves for their machine make and maodel.|Y
01|53574|2|1|External Cable Set|Y
01|53574|2|2|Item is per Axis|Y
01|53574|2|3|Customer to specify length|Y
01|53574|2|4|Including scale cable wired with feedback/data cable|Y
01|53574|3|1|Interface Cable Set|Y
01|53574|3|2|Price is per Axis|Y
01|53574|3|3|Customer to specify length|Y
01|53574|4|1|Riser Plate to fit Scales|Y
01|53574|4|2|Item is NET charge|Y
01|53574|5|1|Scale Kit|Y
01|53574|5|2|Item is per Axis|Y
01|53574|5|3|Quoted as NET Charge|Y
01|53574|7|1|Air Purge System|Y
01|53574|7|2|Item is per Axis|Y
01|53574|9|1|Air Freight Charge to bring table to US from Japan|Y
01|53590|1|1|Reference RGA# T-48270|Y
01|53590|1|2|AA21 Controller & Pendant Box|N
01|53595|12|1|This line at no charge|Y
01|53596|1|1|Reference RGA# T-48243|Y
01|53596|1|2|CNC401FA s/n: NA|N
01|53625|1|1|Reference RGA# T-48290|Y
01|53625|1|2|5AX-201YA-M s/n: 3005|N
01|53627|1|1|This item is non standard stock once a purchase order|Y
01|53627|1|2|is placed it cannot be cancelled or returned.|Y
01|53627|4|1|HSK63F-SK16-90P Slim Chuck|Y
01|53627|4|2|Holder is non standard stock once a purchase order|Y
01|53627|4|3|placed it cannot be cancelled or returned.|Y
01|53643|1|1|Tap collet is non standard stock once a purchase|Y
01|53643|1|2|order is placed it cannot be cancelled or returned.|Y
01|53643|1|3|Please verify shank & square of tap..367 X .275|Y
01|53649|3|1|PLEASE CONFIRM CHUCK AND NUMBER OF PORTS NEEDED|Y
01|53650|1|1|Pitch=P60|Y
01|53657|2|1|Spindle and Nut Wrench|Y
01|53677|1|1|SKN-10Q is a non standard stock item. Once a purchase|Y
01|53677|1|2|order is placed it cannot be cancelled or returned.|Y
01|53691|1|1|Discount reflects Live Tool Core Trade In.|Y
01|53691|2|1|Standard discount quoted.|Y
01|53702|1|1|2-CNCZ180MM High Speed tables with installation kit.|Y
01|53707|1|1|Currently: 30 pcs 1 to 2 weeks/Bal 6 to 7 weeks|Y
01|53715|1|1|2-CNCZ180LYABR tables with TC32B installation kit.|Y
01|53715|1|2|Kit includes drive units junction box sheet metal|Y
01|53715|1|3|external and cabinet cables.|Y
01|53716|7|1|Set comes with 1x Clamp 1x Unclamp switch C1-BDAS6|Y
01|53716|7|2|& Brake Conf. Cylinder.|Y
01|53719|1|1|N5007-0032-2.00  NMTB50 ER32 Collet Chuck|Y
01|53732|1|1|Reference RGA# T-48284|Y
01|53732|1|2|5AX-350FA-R36 s/n: 3513|N
01|53738|2|1|HAAS TO SUPPLY YASNAC MOTOR AND CABLES|Y
01|53738|6|1|SUBPLATE FOR MATCHING TAILSTOCK|Y
01|53738|6|2|PBA-135 TO BE MOUNTED ON SUBPLATE TO MATCH TABLE|Y
01|53741|2|1|Delivery = 6/27/2016|Y
01|53741|3|1|Delivery = 2-weeks from order|Y
01|53742|4|1|This line is referenced at your NET cost|Y
01|53758|3|1|This line is referenced at your NET cost|Y
01|53761|1|1|320MM face plate with Haas motor and cables set.|Y
01|53761|1|2|Note: Software for Nikken table parameters must be|Y
01|53761|1|3|purchased from Haas.|Y
01|53764|1|1|H40E-SF0125-2.36|Y
01|53766|2|1|With purchase of any CAT40 tool holder|Y
01|53771|1|1|Reference RGA# R-48023|Y
01|53771|1|2|2x NC5-63S-F50-220-14|N
01|53781|1|1|Crossover to Exsys part# 7.074.726|Y
01|53781|2|1|Crossover to Exsys part# 7.074.725|Y
01|53781|3|1|Crossover to Exsys part# 7.075.255|Y
01|53797|1|1|MZMP5-ER40X-OFF-ICE re-worked units   in stock|Y
01|53797|1|2|Full Warranty applies|Y
01|53797|1|3|Item may have minor blemishes including etched part no.|Y
01|53797|1|4|pricing is as is|Y
01|53803|2|1|Installation Includes: drive amps cable sets|Y
01|53803|2|2|parameter changes travel and labor for one 5AX-DD|Y
01|53803|2|3|table on one new Hyundia Wia VMC.|Y
01|53803|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|53803|3|2|holders.|Y
01|53809|2|1|HAAS MACHINE NEEDS 4TH AXIS INTERFACE|Y
01|53831|1|1|Quoted at a net price|Y
01|53835|2|1|ITEM QUOTED IN NET PRICE|Y
01|53848|3|1|P-170S Nikken Hydraulic Tailstock|Y
01|53848|3|2|This is a non standard stock item once a purchase|Y
01|53848|3|3|order is placed it cannot be cancelled or returned.|Y
01|53849|1|1|Quoted at a net price|Y
01|53875|2|1|Installation includes: M-code installation mounting|Y
01|53875|2|2|controller boxes cable managment and RS232|Y
01|53878|1|1|Tooling Certificate Number: 13687-775-042616RT|Y
01|53880|2|1|Installation includes: Dual axis drive unit short bar|Y
01|53880|2|2|fiber optic cables communications cables bulkhead|Y
01|53880|2|3|cables external cables parameter changes  service|Y
01|53880|2|4|time and travel.|Y
01|53881|2|1|3.93 gl|Y
01|53881|9|1|4.72 gl|Y
01|53885|2|1|Promo price w/ purchase of any matching BT40 holder|Y
01|53887|1|1|Crossover to Exsys part# 7.074.726|Y
01|53887|2|1|Crossover to Exsys part# 7.074.725|Y
01|53887|3|1|Crossover to Exsys part# 7.075.255|Y
01|53903|2|1|Install includes drive amps bulk head cable set|Y
01|53903|2|2|external cable set communication cable parameter|Y
01|53903|2|3|changes travel and labor for installation of one|Y
01|53903|2|4|5AX table on one new VMC.|Y
01|53903|3|1|*Free Extended Warranty 1 Year (2 Years total warranty)|Y
01|53904|4|1|Cable price included in table price|Y
01|53904|5|1|Cable price included in table price|Y
01|53920|1|1|Net Price reflects SKN-6WBJ coolant nut installed on|Y
01|53920|1|2|holder. Once a order is placed it cannot be cancelled|Y
01|53920|1|3|or returned.|Y
01|53920|3|1|Net Price reflects SKN-10BJ coolant nut installed.|Y
01|53920|3|2|Once a purchase order is placed it cannot be cancelled|Y
01|53920|3|3|or returned.|Y
01|53920|4|1|Net Price reflects SKN-10BJ coolant nut installed on|Y
01|53920|4|2|holder. Once a order is placed it cannot be cancelled|Y
01|53920|4|3|or returned.|Y
01|53920|5|1|Net Price reflects SKN-25BJ coolant nut installed on|Y
01|53920|5|2|holder. Once a purchase order is placed it cannot be|Y
01|53920|5|3|cancelled or returned.|Y
01|53922|3|1|P-170S Nikken Hydraulic Tailstock|Y
01|53922|3|2|This is a non standard stock item once a purchase|Y
01|53922|3|3|order is placed it cannot be cancelled or returned.|Y
01|53923|1|1|Inspection fee to be charged instead of 5 hours|Y
01|53923|1|2|of labor at $110.00/hr as a courtesy to the customer.|Y
01|53923|2|1|Returning customer's pendant box & controller sent in|Y
01|53923|2|2|on RGA# T-48269.  After 5 hours of testing we cannot|Y
01|53923|2|3|find anything wrong with these units.|Y
01|53940|1|1|**standard discount applied|Y
01|53940|3|1|*Slow Moving Inventory. Pricing valid for current stock|Y
01|53940|3|2|of 11 pieces|Y
01|53974|2|1|c4001-100|N
01|53984|4|1|H63F-SF0375-3.00|Y
01|53984|4|2|HSK63F 3/8 Shrink Fit Holder 3.00in projection|Y
01|53984|5|1|H63F-SF0375-6.00|Y
01|53984|5|2|HSK63F 3/8 Shrink Fit Holder 6.00in projection|Y
01|53984|7|1|H63F-SF0500-6.00|Y
01|53984|7|2|HSK63F 1/2 Shrink Fit Holder 6.00in prjection|Y
01|53984|9|1|H63F-SF0625-6.00|Y
01|53984|9|2|HSK63F 5/8 Shrink Fit Holder 6.00in projection|Y
01|53984|11|1|H63F-SF0750-6.00|Y
01|53984|11|2|HSK63F 3/4 Shrink Fit Holder 6.00 projection|Y
01|53984|12|1|H63F-SF1000-3.00|Y
01|53984|12|2|HSK63F 1in Shrink Fit Holder 3in projection|Y
01|53984|13|1|H63F-SF1000-6.00|Y
01|53984|13|2|HSK63F 1in Shrink Fit Holder 6.00 projection|Y
01|53989|1|1|H10RAM-MI40-195OTIC-110FP-SP|Y
01|53989|1|2|110mm 2 flat pin style machine specific flange assembly|Y
01|53989|1|3|DEL: 12 weeks from approval drawing is received|Y
01|53989|1|4|L2 Dimension to be 1.102in or less|Y
01|53989|3|1|H10RAM-ER25-195OTIC-110FP-SP|Y
01|53989|3|2|110mm 2 flat pin style machine specific flange assembly|Y
01|53989|3|3|DEL:12 weeks from approval drawing is received|Y
01|53989|3|4|L2 Dimension to be 1.102in or less|Y
01|53989|6|1|H63ARAM-ER25-187OTIC-70FP-SP HSK63A ER25 Version with|Y
01|53989|6|2|70mm 2 Flat Pin Style Machine Specific Flange Assembly|Y
01|53989|6|3|Del:12 weeks after approved drawing is received.|Y
01|53989|6|4|L2 Dimension to be 1.102in or less|Y
01|53989|8|1|H63ARAM-MI40-187OTIC-70FP-SP HSK63A  MI40 Version same|Y
01|53989|8|2|design as ER25.|Y
01|53989|8|3|70mm 2 Flat Pin Style Machine Specific Flange Assembly|Y
01|53989|8|4|Del:12 weeks after approved drawing is received.|Y
01|53989|8|5|L2 Dimension to be 1.102in or less|Y
01|53992|1|1|NBT30-MDPE-M12-45 Taper Plus 30 Major Dream Pro EndMill|Y
01|53995|2|1|Installation includes:Dual axis drive unti short bars|Y
01|53995|2|2|fiber optic cables bulkhead cablesexternal cables|Y
01|53995|2|3|parameter changes service time and travel|Y
01|53997|1|1|CERTIFICATE HAS A FACE VALUE OF $ 10000.00|Y
01|53998|1|1|MUST CONFIRM PROPER FIT TO MACHINE|Y
01|53998|1|2|HYDRAULIC UNIT FOR BRAKE INCLUDED|Y
01|54006|11|1|*DIN - coolant through flange*|Y
01|54007|1|1|Includes: Table with motor external cables control|Y
01|54007|1|2|box programmabe pendant power cable M-code cable &|Y
01|54007|1|3|RS-232 cable.|Y
01|54048|2|1|SKJ6-4.5C SK6 4.5mm Coolant Thru Disk|Y
01|54048|3|1|SKJ16-8.5 SK16 8.5mm Jet Slot disk|Y
01|54049|2|1|Will plug DIN holes if they can take this version|Y
01|54049|2|2|instead since there is stock available.|Y
01|54074|4|1|CAT40 ER8 Collet Chuck Modified with GL 5.26|Y
01|54074|4|2|*Qty Break Pricing|Y
01|54074|6|1|CAT40 ER8 Collet Chuck Modified with GL 5.26|Y
01|54074|6|2|*Qty Break Pricing|Y
01|54074|8|1|ER8-0125|Y
01|54074|8|2|ER8 1/8 Collet|Y
01|54074|8|3|*not qty break item|Y
01|54074|10|1|ER8-0125(C)|Y
01|54074|10|2|ER8 1/8 Coolant Collet|Y
01|54074|10|3|*not qty break item|Y
01|54078|2|1|Booster for Hydraulic Brake on table|Y
01|54078|3|1|8+1 Rotary Union - 1000 PSI Max|Y
01|54078|4|1|Tail Support Table with Pneumatic Brake.|Y
01|54078|4|2|Will need riser to match table center height.|Y
01|54078|5|1|Installation Kit Includes: Drive amp bulkhead calbe|Y
01|54078|5|2|set and external cable set.|Y
01|54078|7|1|Top Mount Motor|Y
01|54078|8|1|Back Mount Motor|Y
01|54083|1|1|NBT40-Z12-90 Nikken Floating Tap Holder|Y
01|54083|1|2|This tap holder is non standard stock once a purchase|Y
01|54083|1|3|order is placed it cannot be cancelled or returned.|Y
01|54084|1|1|Reference RGA# R-46710|Y
01|54084|1|2|C40RAM-ER32-200OT s/n: 6070752602|N
01|54084|4|1|Bearings seals and o-rings are worn and must be|Y
01|54084|4|2|replaced. Spindles must be resurfaced. Broken bolts on|Y
01|54084|4|3|flange need to be replaced. Labor is included.|Y
01|54087|2|1|Put slots on solid arbor screw to facilitate coolant|Y
01|54087|2|2|through the shell mill.|Y
01|54090|7|1|Wrench for CAT40-SK10-120U|Y
01|54091|3|1|BT30-HC0750-2.50 BT30 Hydraulic Chuck 3/4 X 2.50 Gage|Y
01|54091|3|2|Length.|Y
01|54091|3|3|This item is considered Special once a purchase order|Y
01|54091|3|4|is placed it cannot be cancelled or returned.|Y
01|54092|1|1|This item is considered special once a purchase order|Y
01|54092|1|2|is placed it cannot be cancelled or returned.|Y
01|54112|1|1|Net Price reflects SKN-6WBJ coolant nut installed on|Y
01|54112|1|2|holder. Once a order is placed it cannot be cancelled|Y
01|54112|1|3|or returned.|Y
01|54112|3|1|Net Price reflects SKN-10BJ coolant nut installed.|Y
01|54112|3|2|Once a purchase order is placed it cannot be cancelled|Y
01|54112|3|3|or returned.|Y
01|54112|4|1|Net Price reflects SKN-10BJ coolant nut installed on|Y
01|54112|4|2|holder. Once a order is placed it cannot be cancelled|Y
01|54112|4|3|or returned.|Y
01|54112|5|1|Net Price reflects SKN-25BJ coolant nut installed on|Y
01|54112|5|2|holder. Once a purchase order is placed it cannot be|Y
01|54112|5|3|cancelled or returned.|Y
01|54119|1|1|Tool Number 2|Y
01|54119|2|1|Tool Number 2|Y
01|54119|3|1|Tool Number 50|Y
01|54119|4|1|Tool Number 50|Y
01|54119|5|1|Tool Number 1|Y
01|54119|6|1|Tool Number 1|Y
01|54119|7|1|Tool Number 15|Y
01|54119|8|1|Tool Number 15|Y
01|54119|9|1|Tool Number 14|Y
01|54119|10|1|Tool Number 14|Y
01|54119|11|1|Tool Number 33|Y
01|54119|12|1|Tool Number 33|Y
01|54119|13|1|Tool Number 7|Y
01|54119|14|1|Tool Number 7|Y
01|54119|15|1|Tool Number 31|Y
01|54119|16|1|Tool Number 31|Y
01|54119|17|1|Tool Number 55|Y
01|54119|18|1|Tool Number 55|Y
01|54119|19|1|Tool Number 19|Y
01|54119|20|1|Tool Number 19|Y
01|54119|21|1|Tool Number 12|Y
01|54119|22|1|Tool Number 12|Y
01|54119|23|1|Tool Number 20|Y
01|54119|24|1|Tool Number 20|Y
01|54119|25|1|Tool Number 8|Y
01|54119|26|1|Tool Number 8|Y
01|54119|27|1|Tool Number 9|Y
01|54119|28|1|Tool Number 9|Y
01|54119|31|1|Tool Number 13|Y
01|54119|32|1|Tool Number 13|Y
01|54119|33|1|Tool Number 46|Y
01|54119|34|1|Tool Number 46|Y
01|54119|35|1|Tool Number 4|Y
01|54119|36|1|Tool Number 4|Y
01|54119|37|1|Tool Number 59|Y
01|54119|38|1|Tool Number 59|Y
01|54119|39|1|Tool Number 16|Y
01|54119|40|1|Tool Number 16|Y
01|54119|41|1|Tool Number 34|Y
01|54119|42|1|Tool Number 34|Y
01|54119|43|1|Tool Number 22|Y
01|54119|44|1|Tool Number 22|Y
01|54119|45|1|Tool Number 22|Y
01|54119|46|1|Tool Number 22|Y
01|54119|47|1|Tool Number 56|Y
01|54119|48|1|Tool Number 56|Y
01|54119|49|1|Tool Number 27|Y
01|54119|50|1|Tool Number 27|Y
01|54119|51|1|Tool Number 5|Y
01|54119|52|1|Tool Number 5|Y
01|54119|53|1|Tool Number 17|Y
01|54119|54|1|Tool Number 17|Y
01|54119|55|1|Tool Number 37|Y
01|54119|56|1|Tool Number 37|Y
01|54119|57|1|Tool Number 25|Y
01|54119|59|1|Tool Number 6|Y
01|54119|60|1|Tool Number 6|Y
01|54119|61|1|Tool Number 30|Y
01|54119|62|1|Tool Number 30|Y
01|54119|63|1|Tool Number 11|Y
01|54119|64|1|Tool Number 11|Y
01|54119|66|1|Tool Number 24|Y
01|54119|67|1|Tool Number 43|Y
01|54119|68|1|Tool Number 10|Y
01|54119|69|1|Tool Number 10|Y
01|54119|70|1|Tool Number 38|Y
01|54119|71|1|Tool Number 38|Y
01|54119|72|1|Tool Number 23|Y
01|54119|73|1|Tool Number 23|Y
01|54119|74|1|Tool Number 36|Y
01|54119|75|1|Tool Number 36|Y
01|54119|76|1|Tool Number 28|Y
01|54119|77|1|Tool Number 28|Y
01|54119|78|1|Tool Number 26|Y
01|54119|79|1|Tool Number 26|Y
01|54119|80|1|Tool Number 41|Y
01|54119|81|1|Tool Number 41|Y
01|54119|82|1|Tool Number 21|Y
01|54119|83|1|Tool Number 21|Y
01|54119|84|1|Tool Number 57|Y
01|54119|85|1|Tool Number 57|Y
01|54119|86|1|Tool Number 40|Y
01|54119|87|1|Tool Number 40|Y
01|54119|88|1|Tool Number 58|Y
01|54119|89|1|Tool Number 58|Y
01|54119|90|1|Tool Number 39|Y
01|54119|91|1|Tool Number 39|Y
01|54119|92|1|Tool number 53|Y
01|54119|93|1|Tool Number 53|Y
01|54119|94|1|Tool Number 48|Y
01|54119|95|1|Tool Number 48|Y
01|54119|96|1|Tool Number 60|Y
01|54119|97|1|Tool Number 60|Y
01|54127|1|1|T32009  No Quote|Y
01|54127|3|1|T32008  Will need machine serial number if wrenches|Y
01|54127|3|2|are needed.|Y
01|54127|5|1|#EALT32008A Wrench for T32008|Y
01|54127|7|1|Part #T10046 32mm Boring Bar Holder|Y
01|54133|1|1|Tool Number 2|Y
01|54133|2|1|Tool Number 2|Y
01|54133|3|1|Tool Number 50|Y
01|54133|4|1|Tool Number 50|Y
01|54133|5|1|Tool Number 1|Y
01|54133|6|1|Tool Number 1|Y
01|54133|7|1|Tool Number 15|Y
01|54133|8|1|Tool Number 15|Y
01|54133|9|1|Tool Number 14|Y
01|54133|10|1|Tool Number 14|Y
01|54133|11|1|Tool Number 33|Y
01|54133|12|1|Tool Number 33|Y
01|54133|13|1|Tool Number 7|Y
01|54133|14|1|Tool Number 7|Y
01|54133|15|1|Tool Number 31|Y
01|54133|16|1|Tool Number 31|Y
01|54133|17|1|Tool Number 55|Y
01|54133|18|1|Tool Number 55|Y
01|54133|19|1|Tool Number 19|Y
01|54133|20|1|Tool Number 19|Y
01|54133|21|1|Tool Number 12|Y
01|54133|22|1|Tool Number 12|Y
01|54133|23|1|Tool Number 20|Y
01|54133|24|1|Tool Number 20|Y
01|54133|25|1|Tool Number 8|Y
01|54133|26|1|Tool Number 8|Y
01|54133|27|1|Tool Number 9|Y
01|54133|28|1|Tool Number 9|Y
01|54133|31|1|Tool Number 13|Y
01|54133|32|1|Tool Number 13|Y
01|54133|33|1|Tool Number 46|Y
01|54133|34|1|Tool Number 46|Y
01|54133|35|1|Tool Number 4|Y
01|54133|36|1|Tool Number 4|Y
01|54133|37|1|Tool Number 59|Y
01|54133|38|1|Tool Number 59|Y
01|54133|39|1|Tool Number 16|Y
01|54133|40|1|Tool Number 16|Y
01|54133|41|1|Tool Number 34|Y
01|54133|42|1|Tool Number 34|Y
01|54133|43|1|Tool Number 22|Y
01|54133|44|1|Tool Number 22|Y
01|54133|45|1|Tool Number 22|Y
01|54133|46|1|Tool Number 22|Y
01|54133|47|1|Tool Number 56|Y
01|54133|48|1|Tool Number 56|Y
01|54133|49|1|Tool Number 27|Y
01|54133|50|1|Tool Number 27|Y
01|54133|51|1|Tool Number 5|Y
01|54133|52|1|Tool Number 5|Y
01|54133|53|1|Tool Number 17|Y
01|54133|54|1|Tool Number 17|Y
01|54133|55|1|Tool Number 37|Y
01|54133|56|1|Tool Number 37|Y
01|54133|57|1|Tool Number 25|Y
01|54133|59|1|Tool Number 6|Y
01|54133|60|1|Tool Number 6|Y
01|54133|61|1|Tool Number 30|Y
01|54133|62|1|Tool Number 30|Y
01|54133|63|1|Tool Number 11|Y
01|54133|64|1|Tool Number 11|Y
01|54133|65|1|Tool Number 24|Y
01|54133|66|1|Tool Number 24|Y
01|54133|67|1|Tool Number 43|Y
01|54133|68|1|Tool Number 10|Y
01|54133|69|1|Tool Number 10|Y
01|54133|70|1|Tool Number 38|Y
01|54133|71|1|Tool Number 38|Y
01|54133|72|1|Tool Number 23|Y
01|54133|73|1|Tool Number 23|Y
01|54133|74|1|Tool Number 36|Y
01|54133|75|1|Tool Number 36|Y
01|54133|76|1|Tool Number 28|Y
01|54133|77|1|Tool Number 28|Y
01|54133|78|1|Tool Number 26|Y
01|54133|79|1|Tool Number 26|Y
01|54133|80|1|Tool Number 41|Y
01|54133|81|1|Tool Number 41|Y
01|54133|82|1|Tool Number 21|Y
01|54133|83|1|Tool Number 21|Y
01|54133|84|1|Tool Number 57|Y
01|54133|85|1|Tool Number 57|Y
01|54133|86|1|Tool Number 40|Y
01|54133|87|1|Tool Number 40|Y
01|54133|88|1|Tool Number 58|Y
01|54133|89|1|Tool Number 58|Y
01|54133|90|1|Tool Number 39|Y
01|54133|91|1|Tool Number 39|Y
01|54133|92|1|Tool Number 53|Y
01|54133|93|1|Tool Number 53|Y
01|54133|94|1|Tool Number 48|Y
01|54133|95|1|Tool Number 48|Y
01|54133|96|1|Tool Number 60|Y
01|54133|97|1|Tool Number 60|Y
01|54149|1|1|Reference RGA# R-48307|Y
01|54149|1|2|MZQT47-ER32X-OFF s/n: 66424 07|N
01|54149|3|1|Bearings seals and o-rings must be replaced. Labor is|Y
01|54149|3|2|included.|Y
01|54157|1|1|8pcs in stock 4 pcs 2-3 week delivery|Y
01|54157|2|1|4pcs Stock 8pcs Pending.|Y
01|54162|2|1|Quoted as a substitute for NC5001-0750-1.75|Y
01|54162|4|1|Did they request high speed? Please find out rpm of|Y
01|54162|4|2|machine.|Y
01|54168|1|1|Holders are modified once a purchase order is placed|Y
01|54168|1|2|it cannot be cancelled or returned.|Y
01|54172|2|1|HFO TO SUPPLY MOTORS AND CABLES FOR BOTH AXIS|Y
01|54177|8|1|3pc Remaining once inventory has been depleted this|Y
01|54177|8|2|item will be discontinued.|Y
01|54177|9|1|HSK63A-0125-6.00|Y
01|54177|11|1|HSK63A-0125-3.00|Y
01|54196|2|1|TABLE IS AIR BRAKE|Y
01|54198|2|1|Table is hydraulic clamp for Brake both axis|Y
01|54198|2|2|Hydraulic unit below needed|Y
01|54198|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|54198|11|1|tThis table air brake only. application needed|Y
01|54205|1|1|HF-H104T-A48 MOTOR REQUIRED. WITH STANDARD MAZAK1|Y
01|54205|1|2|CONNECTOR WIRE HARNESS|Y
01|54205|3|1|FOR MAZAK. NEED TO CONFIRM WIRING INFO|Y
01|54219|1|1|T00202|Y
01|54219|2|1|T10101|Y
01|54220|2|1|This line at no charge|Y
01|54220|4|1|This line at no charge|Y
01|54238|1|1|Reference RGA# T-48310|Y
01|54238|1|2|5AX-2002FA s/n: 1604|N
01|54238|4|1|Rotary side motor harness.|Y
01|54241|1|1|HSK63A-STUB MILL ARBOR 1.25 Diam 12 GL SPECIAL|Y
01|54241|2|1|HSK63A-STUB MILL ARBOR 1.25 Diam 12 GL SPECIAL|Y
01|54241|3|1|HSK63A-STUB MILL ARBOR 1.25 Diam 12 GL SPECIAL|Y
01|54241|4|1|HSK63A-END MILL HLDR 1.25 ID 12 GL SPECIAL|Y
01|54241|5|1|HSK63A-END MILL HLDR 1.25 ID 12 GL SPECIAL|Y
01|54241|6|1|HSK63A-END MILL HLDR 1.25 ID 12 GL SPECIAL|Y
01|54244|1|1|Slitting Saw Cap for HK125A-SA1000-6.75-ID UNV 451|Y
01|54244|3|1|Key for HSK125A-SA1000-6.75ID UNV 451|Y
01|54254|1|1|HW-12C-OS-R1466 Howa Power Chuck for Okuma 2SPV40|Y
01|54254|2|1|Soft Jaws for above Chuck - 3pcs needed per Chuck|Y
01|54257|1|1|NBT30-SKT10C-90P Taper Plus 30 SK10 HiSpeed Rigid Chuck|Y
01|54257|2|1|NBT30-SKT16C-90P Taper Plus 30 SK16 HiSpeed Rigid Chuck|Y
01|54257|3|1|NBT30-SKT6C-90P Taper Plus 30 SK6 HiSpeed Rigid Chuck|Y
01|54266|3|1|Nut wrench for ER40 live tools|Y
01|54266|4|1|Spindle wrench for ER40 live tools|Y
01|54266|8|1|Nut wrench for ER32 live tools|Y
01|54266|9|1|Spindle wrench for ER32 live tools|Y
01|54283|2|1|Installation includes: drive amp bulkhead cable set|Y
01|54283|2|2|external cable set parameter changes travel and|Y
01|54283|2|3|labor for installing one 4th axis table on one new VMC.|Y
01|54290|1|1|PS-309 Nikken Retention Knob for Kitamura HX400G IT40|Y
01|54309|1|1|Reference RGA# T-48283|Y
01|54309|1|2|5AX-350FA-R36 s/n: 3521|Y
01|54312|49|1|Dave Werblo|Y
01|54319|29|1|NCAT40-SF4-80/Taper Plus 4mm Shrink Fit with 80mm Gage|Y
01|54319|29|2|Pricing based on 1-2PCS|Y
01|54319|30|1|NCAT40-SF4-80/Taper Plus 4mm Shrink Fit with 80mm Gage|Y
01|54319|30|2|Pricing based on 3-5PCS|Y
01|54319|31|1|NCAT40-SF6-80/Taper Plus 6mm Shrink Fit with 80mm Gage|Y
01|54319|31|2|Pricing based on 1-2PCS|Y
01|54319|32|1|NCAT40-SF6-80/Taper Plus 6mm Shrink Fit with 80mm Gage|Y
01|54319|32|2|Pricing based on 3-5PCS|Y
01|54319|33|1|NCAT40-SF8-80/Taper Plus 8mm Shrink Fit with 80mm Gage|Y
01|54319|33|2|Pricing based on 1-2PCS|Y
01|54319|34|1|NCAT40-SF8-80/Taper Plus 8mm Shrink Fit with 80mm Gage|Y
01|54319|34|2|Pricing based on 3-5PCS|Y
01|54319|35|1|NCAT40-SF10-80/ Taper Plus 10mm Shrink Fit 80mm Gage|Y
01|54319|35|2|Pricing based on 1-2PCS|Y
01|54319|36|1|NCAT40-SF10-80/ Taper Plus 10mm Shrink Fit 80mm Gage|Y
01|54319|36|2|Pricing based on 3-5PCS|Y
01|54321|2|1|Promo price with purchsae of any CAT50 toolholder|Y
01|54323|1|1|HSK100A-C32-115G|Y
01|54327|14|1|*Slotted Arbor Screw for C5001-1000-1.75|Y
01|54328|2|1|SERVICE AT CRAIG ON NIKKEN CNC-202|Y
01|54328|2|2|PLEASE SEE SERVICE REPORT ATTACHED|Y
01|54351|2|1|ZKG24 Tap=20mm Sh=16.48mm Sq=12.22mm|Y
01|54351|3|1|ZKG24 Tap=24mm Sh=19.17mm Sq=14.40|Y
01|54351|4|1|ZKG24 Tap=14mm Sh=10.8mm Sq=8mm|Y
01|54375|10|1|*wrench for Standard: CAT50-C1.1/4-105U|Y
01|54375|13|1|*wrench for Hi-Speed: CAT50-C1.1/4-105UG|Y
01|54397|2|1|NK103-38000|Y
01|54397|2|2|ER32 Straight Holder X-Axis|Y
01|54397|4|1|NK103-28000|Y
01|54397|4|2|ER32 Straight Holder Z-Axis|Y
01|54448|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|54453|8|1|3pc Remaining once inventory has been depleted this|Y
01|54453|8|2|item will be discontinued.|Y
01|54453|9|1|HSK63A-0125-6.00|Y
01|54453|11|1|HSK63A-0125-3.00|Y
01|54464|1|1|NBT30-SKT10C-90P Taper Plus 30 SK10 HiSpeed Rigid Chuck|Y
01|54464|2|1|NBT30-SKT16C-90P Taper Plus 30 SK16 HiSpeed Rigid Chuck|Y
01|54464|3|1|NBT30-SKT6C-90P Taper Plus 30 SK6 HiSpeed Rigid Chuck|Y
01|54465|1|1|NBT30-SKT10C-90P Taper Plus 30 SK10 HiSpeed Rigid Chuck|Y
01|54465|2|1|NBT30-SKT16C-90P Taper Plus 30 SK16 HiSpeed Rigid Chuck|Y
01|54465|3|1|NBT30-SKT6C-90P Taper Plus 30 SK6 HiSpeed Rigid Chuck|Y
01|54465|26|1|SKJ6-2.5C  SK6 Coolant Thru Disk 2.5mm ID|Y
01|54472|4|1|PLEASE CONFIRM PILOT DIAMETER|Y
01|54472|5|1|PLEASE CONFIRM PILOT DIAMETER|Y
01|54510|1|1|Basic Rebuild (Bearings/Seals/O-rings) + Labor|Y
01|54510|2|1|Parts to rebuild the brake system (If necessary)|Y
01|54510|3|1|Hard parts to be replaced (If necessary)|Y
01|54513|2|1|This item at no charge as a courtesy to the customer|Y
01|54513|6|1|This item at no charge as a courtesy to the customer|Y
01|54515|3|1|Installation kit: Dual axis drive short bar fiber|Y
01|54515|3|2|optic cables bulkhead cables external cables.|Y
01|54540|1|1|Non-returnable Non-Cancellable|Y
01|54540|2|1|Non-returnable Non-Cancellable|Y
01|54540|3|1|Non-returnable Non-Cancellable|Y
01|54561|1|1|Reference RGA# T-48400|Y
01|54561|1|2|CNC200LZA s/n: 9016|N
01|54567|1|1|Reference RGA# R-48379|Y
01|54567|1|2|BT40-MMC8C-90 sent in for evaluation - unrepairable.|Y
01|54567|1|3|Replacement suggested.|Y
01|54568|3|1|hydraulic  pancake cylinders|Y
01|54568|4|1|Foot Pedal for actuating hydraulic pancake cylinders.|Y
01|54571|1|1|Reference RGA# R-48394|Y
01|54571|1|2|PF-2|N
01|54574|2|1|2pcs in stock 1pc ETA approx 2-3 weeks|Y
01|54575|3|1|This line is referenced at your NET cost|Y
01|54577|1|1|Reference RGA# R-48357|Y
01|54577|1|2|C5005-0875-5.66|N
01|54599|1|1|Price relfects net charge|Y
01|54600|1|1|Two tail stocks with MT#4 center sockets.|Y
01|54603|1|1|Reference RGA# T-48189|Y
01|54603|1|2|5AX-2MT-105-120FA s/n: 8243|N
01|54607|6|1|Quoted for consideration|Y
01|54610|3|1|Quoted at a net price|Y
01|54610|4|1|Quoted at a net price|Y
01|54611|1|1|Reference RGA# LVR-48191|Y
01|54611|1|2|Inspection fees assessed for the evaluation of|Y
01|54611|1|3|OKL3-ER32Z-OFMS s/n: AL163|Y
01|54621|1|1|Reference RGA# R-48302|Y
01|54621|1|2|OKU-L370-X (OKL3-ER32X) s/n: AL0412|N
01|54621|4|1|Spindle and gears are worn and must be replaced.|Y
01|54621|4|2|Collet nut bearings seals and o-rings are worn and|Y
01|54621|4|3|must also be replaced. Labor is included.|Y
01|54626|1|1|Reference RGA# R-48255|Y
01|54626|1|2|OKLU3-ER50Z s/n: NA|N
01|54626|3|1|Clutch is worn and must be replaced. Collet nut|Y
01|54626|3|2|bearings seals and o-rings are worn and must be|Y
01|54626|3|3|replaced. Labor is included.|Y
01|54633|1|1|This line is referenced at your NET cost|Y
01|54633|2|1|This line is referenced at your NET cost|Y
01|54673|1|1|Custom M-Code Cable|Y
01|54673|1|2|8 Meter in Length for Old Style Nikken Alpha/8800|Y
01|54682|1|1|HFO Tampa to supply correct motors|Y
01|54682|1|2|HFO Tampa to supply cables|Y
01|54682|4|1|HFO Tampa to supply correct motors|Y
01|54682|4|2|HFO Tampa to supply cables|Y
01|54683|1|1|HIgh Speed twin spindle rotary table with Mitsubishi|Y
01|54683|1|2|motor.|Y
01|54683|2|1|High Speed four spindle rotary table with Mitsubishi|Y
01|54683|2|2|motor.|Y
01|54683|3|1|High Speed four spindle table with Nikken Alpha 21|Y
01|54683|3|2|control.|Y
01|54683|4|1|High Speed twin spindle rotary table with Nikken|Y
01|54683|4|2|Alpha 21 control.|Y
01|54689|2|1|REPLACEMENT TO S/N 2190|Y
01|54689|2|2|WITHOUT MOTOR AND EXTERNAL CABLES|Y
01|54689|2|3|APPROVAL DRAWING WILL BE SUPPLIED|Y
01|54689|2|4|DELIVERY 10-14 WEEKS ARO|Y
01|54695|1|1|Reference RGA# R-48369|Y
01|54695|1|2|Nakamura Tool #1 s/n: NA|N
01|54695|3|1|Bearings seals and o-rings must be replaced. Spindles|Y
01|54695|3|2|must be resurfaced. Labor is included.|Y
01|54695|5|1|Nakamura Tool #2 s/n: NA|N
01|54695|7|1|Bearings seals and o-rings must be replaced. Spindles|Y
01|54695|7|2|must be resurfaced. Labor is included.|Y
01|54700|3|1|Included with shrink unit (2 pcs)|Y
01|54710|4|1|This line at no charge with purchase of modular AH|Y
01|54734|3|1|Only 1pc in stock>>Can they possibly use the Dble ended|Y
01|54734|3|2|part number I show below and have good in stock?|Y
01|54742|2|1|This GL is currently on B/O but in stock at factory.|Y
01|54742|2|2|Cutoff for next Air Freight shipment is 7/14 and would|Y
01|54742|2|3|arrive aprox 2 weeks. If ordered after this date next|Y
01|54742|2|4|arrival would be end of August.|Y
01|54748|1|1|Pneumatic Brake|Y
01|54748|3|1|Includes: drive amps bulk head cable sets external|Y
01|54748|3|2|cable sets fiber optic cable communication cables|Y
01|54748|3|3|travel and labor. Machine is V1000 Hardinge w/MITS|Y
01|54756|1|1|Quoted at a net price|Y
01|54756|1|2|HSK63A Face Mill Holder 27mm|Y
01|54756|2|1|HSK63A Face Mill Holder 27mm|Y
01|54757|5|1|Bakers Dozen Promotion Holder(List less 100%)|Y
01|54763|5|1|Installation: Drive unit short bar fiber optic cable|Y
01|54763|5|2|communications cable bulkhead cables external cables|Y
01|54763|5|3|parameter changes service time and travel.|Y
01|54763|6|1|Installation with existing drive:Includes external|Y
01|54763|6|2|cables parameter changes service time and travel.|Y
01|54790|2|1|Quoted at a net price|Y
01|54790|2|2|Coolant Port Modification on B4006-0250-2.50|Y
01|54790|5|1|Quoted at a net price|Y
01|54790|5|2|Jet slot modification on B4006-0250-2.50|Y
01|54793|1|1|HSK100A-SK16-105P-IDU  Hi-Speed Slim Chuck w/ ID Chip|Y
01|54793|1|2|hole cut at factory|Y
01|54793|2|1|HSK100A-SK16-105P-J-IDU Hi-Speed Slim Chuck w/ ID Chip|Y
01|54793|2|2|hole cut and coolant nut installed from factory|Y
01|54796|2|1|Stock atlernative to 2.75 gage length|Y
01|54798|1|1|*Net Price quoted|Y
01|54798|1|2|*Non-Stock item/ Once a PO has been issued it cannot|Y
01|54798|1|3|be cancelled or returned.|Y
01|54812|2|1|External Cable Set|Y
01|54812|2|2|Item is per Axis|Y
01|54812|2|3|Customer to specify length|Y
01|54812|2|4|Including scale cable wired with feedback/data cable|Y
01|54812|3|1|Interface Cable Set|Y
01|54812|3|2|Price is per Axis|Y
01|54812|3|3|Customer to specify length|Y
01|54812|4|1|Riser Plate to fit Scales|Y
01|54812|4|2|Item is NET charge|Y
01|54812|5|1|Scale Kit|Y
01|54812|5|2|Item is per Axis|Y
01|54812|5|3|Quoted as NET Charge|Y
01|54812|6|1|3 Port Rotary Joint|Y
01|54812|6|2|Mounted to Scale on Rotary Side|Y
01|54812|7|1|Air Purge System|Y
01|54812|7|2|Item is per Axis|Y
01|54812|9|1|Air Freight Charge to bring table to US from Japan|Y
01|54819|1|1|Note pricing reflects NET charge USD|Y
01|54828|18|1|COLLET PROMO PRICING HAS BEEN APPLIED! As long as these|Y
01|54828|18|2|Collets are purchased at the same time as their matchng|Y
01|54828|18|3|holders you may take an extra 3% discount on them!|Y
01|54845|1|1|Tooling Certificate Number: 20880-783-060716|Y
01|54879|1|1|Quoted at a net price|Y
01|54879|2|1|Quoted at a net price|Y
01|54895|1|1|Reference RGA# T-48373|Y
01|54895|1|2|CNC200 s/n: NA|N
01|54895|5|1|CN202R023: Side Cover|Y
01|54903|1|1|Reference RGA# T-48312|Y
01|54903|1|2|CNCZ180 s/n: 12216|N
01|54904|1|1|This item is a hot deal *Non-returnableNon-Cancellable|Y
01|54927|1|1|Part# 133756|Y
01|54927|2|1|Part# 103554|Y
01|54927|3|1|Part# 171413|Y
01|54927|4|1|Part# 133771|Y
01|54927|5|1|133747 with precision adjustment option|Y
01|54929|2|1|*once holder have been modified units cannot be|Y
01|54929|2|2|cancelled or returned|Y
01|54929|4|1|*installed with SKN-16BJ coolant nut|Y
01|54929|5|1|*installed on CAT40-SK16-90U|Y
01|54930|1|1|Reference RGA# T-48432|Y
01|54930|1|2|2x AA21N-CTRL-750|N
01|54932|1|1|Reference RGA# R-48423|Y
01|54932|1|2|CAT50-NPU13-190U|N
01|54935|1|1|NBT30-SKT10C-90P Taper Plus 30 SK10 HiSpeed Rigid Chuck|Y
01|54935|2|1|NBT30-SKT16C-90P Taper Plus 30 SK16 HiSpeed Rigid Chuck|Y
01|54935|3|1|NBT30-SKT6C-90P Taper Plus 30 SK6 HiSpeed Rigid Chuck|Y
01|54936|2|1|WITH TRADE IN OF OLD LIVE TOOL|Y
01|54937|1|1|NBT30-SKT10C-90P-J TaperPlus30 SK10 HiSpeed Rigid Chuck|Y
01|54937|1|2|with Coolant Nut installed at factory|Y
01|54937|2|1|NBT30-SKT16C-90P-J TaperPlus30 SK16 HiSpeed Rigid Chuck|Y
01|54937|2|2|with Coolant Nut installed at factory|Y
01|54937|3|1|NBT30-SKT6C-90P-J TaperPlus30 SK6 HiSpeed Rigid Chuck|Y
01|54937|3|2|with Coolant Nut installed at factory|Y
01|54937|42|1|SKJ6-2.5C  SK6 Coolant Thru Disk 2.5mm ID|Y
01|54952|1|1|Coolant nut installed|Y
01|54952|2|1|Coolant nut installed|Y
01|54952|26|1|90 degree|Y
01|54952|30|1|60 degree|Y
01|54959|3|1|Installation includes: Drive unit short bar fiber|Y
01|54959|3|2|optic cable communications cable bulkhead cables|Y
01|54959|3|3|external cables service time and travel.|Y
01|54978|3|1|This line at no charge as a courtesy to the customer|Y
01|54986|1|1|Values in American Dollars (USD)|Y
01|54986|1|2|Warranty Parts No Commercial Value|Y
01|54986|1|3|Value for Customs purpose only|Y
01|54987|1|1|PLEASE NOTE WHEN ORDERED US CNCZ-180L|Y
01|54987|1|2|REFERENCE BROTHER CNCZ-180LSA S/N 6016 TABLWE ONLY|Y
01|54987|1|3|NO MOTOR|Y
01|54988|4|1|Includes: Bulk head cable set External cables set|Y
01|54988|4|2|parameter changes service time & travel|Y
01|54988|4|3|For Doosan DNM500l|Y
01|55008|1|1|Same as C50-OKUMA(OH)|Y
01|55017|1|1|Machine Package Includes:|Y
01|55017|1|2|2x CAT40 Chuck Pots Cooling Unit and|Y
01|55017|1|3|10x CAT40 Standard Length Shrink Fit Holder of choice|Y
01|55017|1|4|SF-PACKAGE-CT40-STD|Y
01|55019|1|1|Machine Package Includes:|Y
01|55019|1|2|2x CAT50 Chuck Pots Cooling Unit and|Y
01|55019|1|3|10x CAT50 Standard Length Shrink Fit Holder of choice|Y
01|55019|1|4|SF-PACKAGE-CT50-STD|Y
01|55030|3|1|Pricing reflects 1-10PCS|Y
01|55030|4|1|Pricing reflect 11+PCS|Y
01|55030|13|1|Please Note: Discount will be 42% if 11 or more holders|Y
01|55030|13|2|are ordered.|Y
01|55030|15|1|Tool is non standard stock once a purchase order is|Y
01|55030|15|2|placed it cannot be cancelled or returned. Tool is|Y
01|55030|15|3|quoted at NET price.|Y
01|55040|1|1|Pricing reflects 1-2PCS|Y
01|55040|2|1|Pricing reflects 3-5PCS|Y
01|55043|1|1|Reference RGA# R-48407|Y
01|55043|1|2|MZMP46-ER16-AD-HS s/n: 28904 02|N
01|55043|3|1|Gears are damaged and must be replaced.|Y
01|55043|3|2|Bearings seals and o-rings are worn and must be|Y
01|55043|3|3|replaced. Labor is included.|Y
01|55050|2|1|Nikken has standard and we can have them converted.|Y
01|55059|1|1|Reference RGA# T-48443|Y
01|55059|1|2|5AX-201 s/n: 4197|N
01|55086|7|1|Minimum 1 Hour Labor|Y
01|55087|3|1|T32121A07 ER Collet Adapter for Mori Live Tooling|Y
01|55088|1|1|Reference RGA# T-48312|Y
01|55088|1|2|CNCZ180 s/n: 12216|N
01|55100|14|1|We do not carry E20-040(C)>>5/8 so I subbed ER32.|Y
01|55104|1|1|Reference RGA# T-48433|Y
01|55104|1|2|NSVX400MA s/n: 2094|Y
01|55104|30|1|Repair to be completed three business days from the|Y
01|55104|30|2|receipt of approval to proceed.|Y
01|55104|30|3|Normal delivery is 1-2 weeks.|Y
01|55109|2|1|Quoted at a net price|Y
01|55116|7|1|Minimum 1 Hour Labor|Y
01|55118|2|1|the prior quote #54689 reflected wrong hand table|Y
01|55118|2|2|This revised quote is corrected Direct replacement|Y
01|55118|2|3|for serial # 2190 that Denso already using|Y
01|55118|2|4|NSVX-500LMA   with no motor|Y
01|55124|1|1|Option #1 (7.087 Diameter Faceplate)|Y
01|55124|4|1|Includes: drive amp bulk head cable set external|Y
01|55124|4|2|cable set fiber optic cable communication cable|Y
01|55124|4|3|travel and labor for installation. ( TWO AXIS)|Y
01|55124|4|4|For Doosan DT3600 w/Fanuc 0im control|Y
01|55124|4|5|need to confirm ladder can support 5 axis|Y
01|55124|4|6|need to confirm parameters are already turned on|Y
01|55130|1|1|2-CNCZ180LSABR tables with sheet metal divider drive|Y
01|55130|1|2|units junction box and cabinet cabling.|Y
01|55142|7|1|NA50 Nut for T32247|Y
01|55142|7|2|Quoted at a net price|Y
01|55150|3|1|Pre-balanced and Balancable|Y
01|55160|1|1|Net Price reflects SKN-6WBJ coolant nut installed on|Y
01|55160|1|2|holder. Once a order is placed it cannot be cancelled|Y
01|55160|1|3|or returned.|Y
01|55160|3|1|Net Price reflects SKN-10BJ coolant nut installed.|Y
01|55160|3|2|Once a purchase order is placed it cannot be cancelled|Y
01|55160|3|3|or returned.|Y
01|55160|4|1|Net Price reflects SKN-10BJ coolant nut installed on|Y
01|55160|4|2|holder. Once a order is placed it cannot be cancelled|Y
01|55160|4|3|or returned.|Y
01|55160|5|1|Net Price reflects SKN-25BJ coolant nut installed on|Y
01|55160|5|2|holder. Once a purchase order is placed it cannot be|Y
01|55160|5|3|cancelled or returned.|Y
01|55169|1|1|Reference RGA# R-48452|Y
01|55169|1|2|PF-2 Version 1|N
01|55175|3|1|Wrench for MI63-EM1|Y
01|55175|6|1|Wrench for MI63-ER40I|Y
01|55175|7|1|Wrench for MI63-ER40I|Y
01|55180|1|1|Reference RGA# R-48434|Y
01|55180|1|2|C40RA-0025 s/n: NA|N
01|55181|1|1|130MM twin spindle table with 170MM pitch|Y
01|55181|1|2|Backhand mounted motor and risers for greater tilt|Y
01|55181|1|3|Change the tilting range from -30 to +140 degrees|Y
01|55181|1|4|Direct mount cables included|Y
01|55183|2|1|Gage Length 2.50|Y
01|55183|7|1|Gage Length 2.50|Y
01|55183|11|1|Gage Length 2.50|Y
01|55193|1|1|HF-H104T-A48 MOTOR REQUIRED. WITH STANDARD MAZAK1|Y
01|55193|1|2|CONNECTOR WIRE HARNESS|Y
01|55193|3|1|FOR MAZAK. NEED TO CONFIRM WIRING INFO|Y
01|55197|2|1|Gage Length 2.50|Y
01|55197|7|1|Gage Length 2.50|Y
01|55197|11|1|Gage Length 2.50|Y
01|55200|9|1|This line at no charge|Y
01|55200|10|1|This line at no charge|Y
01|55204|1|1|Installation Kit for a CNC302 on a Doosan DNM500|Y
01|55204|1|2|Amplifier Servo Drive NOT included as customer has.|Y
01|55212|3|1|EXTERNAL CABLE SET|Y
01|55212|3|2|SOME PARAMETERS TO BE CHANGE LYNDEX NIKKEN TO ADVISE|Y
01|55212|3|3|MACHINE MUST BE AT LEAST 1 YEAR OLD|Y
01|55213|2|1|CNC-401T WITH SEPERATE CONTROLLER FOR TOYODA|Y
01|55213|2|2|INSTALLATION NOT QUOTED TILL DECISION TO BE MADE|Y
01|55213|2|3|TABL;E WITH RISER & BOOSTER|Y
01|55213|5|1|CNC601 WITH INDEEPENDENT CONTROLLER|Y
01|55213|5|2|INSTALLTION NOT INCLUDED TILL DECISION MADE ON PROCESS|Y
01|55213|5|9|DELIVERY OF BOTH TABLES 4-6 WEEKS ARO OR SOONER|Y
01|55213|7|1|INCLUDES INSTALL OF INDEPENDENT CONTROLLER W/CABLES|Y
01|55213|7|2|JUNCTION BOX FOR CABLES CONNECTION|Y
01|55213|7|3|TRAVEL AND LABOR|Y
01|55213|7|4|@@@@ M FUNCTION NEEDED|Y
01|55214|3|1|HAAS INTERFACE CABLE REQUIRED|Y
01|55225|1|1|2pcs stock 2 pcs ETA pending factory|Y
01|55225|2|1|1pc stock 3pcs ETA pending factory|Y
01|55235|1|1|without motor with wire harness|Y
01|55235|1|2|No motor included (No quote for CNCZ260OSP2-M)|Y
01|55235|4|1|without motor with wire harness|Y
01|55251|1|1|*position block sold separate|Y
01|55263|3|1|This line at no charge as a courtesy to the customer|Y
01|55263|4|1|This line at no charge as a courtesy to the customer|Y
01|55263|8|1|This line at no charge as a courtesy to the customer|Y
01|55263|9|1|This line at no charge as a courtesy to the customer|Y
01|55265|1|1|320MM face plate with Haas motor and cable set.|Y
01|55265|3|1|500 psi hydraulic unit with solenoid  pressure switch|Y
01|55265|3|2|and hoses with quick disconnect.|Y
01|55272|1|1|*qty break pricing|Y
01|55272|2|1|*qty break pricing|Y
01|55310|1|1|Reference RGA# R-48454|Y
01|55310|1|2|NC5-46-SK10C-75|N
01|55310|8|1|NC5-46-SK10C-75|N
01|55313|14|1|*6 gage length|Y
01|55313|15|1|*DIN holes will be plugged|Y
01|55317|1|1|Quoted at a net price|Y
01|55325|2|1|Quoted at a net price|Y
01|55326|1|1|*installed with SKN-16BJ coolant nut|Y
01|55326|2|1|*installed on CAT50-SK16-105U|Y
01|55343|2|1|PROMO-ITEM|Y
01|55346|1|1|NCAT50-C2-125U  Milling Chuck CAT50 Taper Plus|Y
01|55346|1|2|2.0 x 125mm gage length|Y
01|55346|10|1|CAT50-C1.1/4-165U Milling Chuck CAT50 Taper Plus|Y
01|55346|10|2|1.1/4 X 165mm|Y
01|55351|14|1|*6 gage length|Y
01|55351|15|1|*DIN holes will be plugged|Y
01|55362|1|1|Included with machine package:|Y
01|55362|1|2|Side Rack for Induction Rings|Y
01|55362|1|3|Side Rack for Taper Pots|Y
01|55362|1|4|Cooling Bracket Sets 2mm-40mm|Y
01|55362|1|5|Induction Ring Set 2mm-40mm|Y
01|55362|1|6|Cooling System with slide over access|Y
01|55362|1|7|2x SF-POT-#50-FI5 Chuck Pots|Y
01|55362|1|8|*Including:|Y
01|55362|1|9|10-FREE Std Length CAT50 Shrink Fit Holders|Y
01|55401|2|1|SCHUNK TRIBOS SVL-6-3/4 Extension with 1/4 holding|Y
01|55401|3|1|SCHUNK TRIBOS SVL-6-3/4 Extension with 1/2 holding|Y
01|55401|4|1|SCHUNK TRIBOS holder SPF-R HSK-A 63 32mm-I.D. X 150mm|Y
01|55401|5|1|GZB-S-20 1/4-I.D. X 20mm-O.D. and L1=50.5mm|Y
01|55401|6|1|4pcs stock 2pcs eta approx 5-7 business days|Y
01|55401|6|2|GZB-S-20 1/2-I.D. X 20mm-O.D. and L1=50.5mm|Y
01|55401|7|1|TECHNIKS ER Collet Chuck holder HSK-A 63 40ER X 80mm|Y
01|55401|8|1|TECHNIKS ER Collet Chuck holder HSK-A 63 40ER X 80mm|Y
01|55409|1|1|Includes: Table with Mits Motor and air brake.|Y
01|55409|1|2|*Hydraulic braking is an option but would require a|Y
01|55409|1|3|hydraulic unit or air/hydraulic booster which is not|Y
01|55409|1|4|included in this quotation.|Y
01|55409|2|1|Installation Includes: Drive amp bulk head cable set|Y
01|55409|2|2|external cable set communication cable parameter|Y
01|55409|2|3|changes travel and labor for installing one rotary|Y
01|55409|2|4|table on one new Hardinge V1000 VMC.|Y
01|55417|8|1|*net price|Y
01|55417|8|2|Lyndex-Nikken can make block upon receipt of final|Y
01|55417|8|3|specs/drawing of machine spindle|Y
01|55419|1|1|VDI50 Emag Live Tool X-axis Straight Tool MI50 Output|Y
01|55419|1|2|P/N:124332|Y
01|55419|2|1|P/N:155473|Y
01|55419|3|1|VDI50 Emag Live Tool X-Axis Straight Tool ER32 Output|Y
01|55419|3|2|P/N:124329|Y
01|55424|2|1|C4016-0187-4.00/MODIFICATION-JET SLOT is Non-Returnable|Y
01|55424|2|2|and Non-Cancelable|Y
01|55434|1|1|*qty break pricing|Y
01|55434|2|1|*qty break pricing|Y
01|55434|3|1|*qty break pricing 3-4pcs|Y
01|55457|1|1|Table with Alpha21 control for both tilt and rotary|Y
01|55457|1|2|axis. Air Brake on both axis.|Y
01|55457|2|1|Installation Support: On site installation support for|Y
01|55457|2|2|Alpha21 table.|Y
01|55474|1|1|Hot Deals|Y
01|55493|1|1|Special Direct Mount Cables|Y
01|55493|1|2|For CNCZ321LFA S/N 10024|Y
01|55493|1|3|For Toyoda Machine with Alpha12/3000i Motor|Y
01|55493|1|4|20ft of Conduit - Direct Mount both Ends|Y
01|55493|1|5|30ft Encoder & Power Cable 35ft Signal Cable|Y
01|55506|1|1|Requires compatible 80 amp drive unit.|Y
01|55506|1|2|Will require machine data sheets to confirm|Y
01|55506|2|1|Table to Bulkhead External Cable Set|Y
01|55506|2|2|TCE-95947-2500R  Ext Power Cable R-Axis 2.5M|Y
01|55506|2|3|TCE-95951-2500R  Ext Feedback Cable R-Axis 2.5M|Y
01|55506|3|1|Cabinet to Bulkhead Cables - As Required|Y
01|55506|3|2|FANUC-AI-CB-CABLE-FBR-6.5|Y
01|55506|3|3|FANUC-AI-CB-CABLE-PWR-6.5|Y
01|55506|4|1|As Required|Y
01|55508|4|1|This is not exact base needed. I have requested quote|Y
01|55508|4|2|from Mimatic for Taper Plus version NC40-MRAM-IC.|Y
01|55510|18|1|35% off collets with purchase of matching collet chuck|Y
01|55511|2|1|SCHUNK TRIBOS SVL-6-3/4 Extension with 1/4 holding|Y
01|55511|3|1|SCHUNK TRIBOS SVL-6-3/4 Extension with 1/2 holding|Y
01|55511|5|1|SCHUNK TRIBOS holder SPF-R HSK-A 63 32mm-I.D. X 150mm|Y
01|55511|7|1|GZB-S-20 1/4-I.D. X 20mm-O.D. and L1=50.5mm|Y
01|55511|8|1|4pcs stock 2pcs eta approx 5-7 business days|Y
01|55511|8|2|GZB-S-20 1/2-I.D. X 20mm-O.D. and L1=50.5mm|Y
01|55511|9|1|TECHNIKS ER Collet Chuck holder HSK-A 63 40ER X 80mm|Y
01|55511|10|1|TECHNIKS ER Collet Chuck holder HSK-A 63 40ER X 80mm|Y
01|55512|2|1|SCHUNK TRIBOS SVL-6-3/4 Extension with 1/4 holding|Y
01|55512|3|1|SCHUNK TRIBOS SVL-6-3/4 Extension with 1/2 holding|Y
01|55512|4|1|SCHUNK TRIBOS holder SPF-R HSK-A 63 32mm-I.D. X 150mm|Y
01|55512|5|1|GZB-S-20 1/4-I.D. X 20mm-O.D. and L1=50.5mm|Y
01|55512|6|1|4pcs stock 2pcs eta approx 5-7 business days|Y
01|55512|6|2|GZB-S-20 1/2-I.D. X 20mm-O.D. and L1=50.5mm|Y
01|55512|7|1|TECHNIKS ER Collet Chuck holder HSK-A 63 40ER X 80mm|Y
01|55512|8|1|TECHNIKS ER Collet Chuck holder HSK-A 63 40ER X 80mm|Y
01|55519|2|1|Quoted at a net price|Y
01|55519|2|2|C40S5-12-80 with Jet slots added|Y
01|55525|1|1|Reference RGA# R-47958|Y
01|55525|1|2|#1 HSK100A-C16-105-IDU|N
01|55525|8|1|#2 HSK100-C20EX-115-IDU|N
01|55525|15|1|#3 HSK100A-C25EX-115-IDU|N
01|55525|21|1|#4 HSK100A-C25EX-115-IDU|N
01|55534|1|1|SKN-10Q is a non standard stock item. Once a purchase|Y
01|55534|1|2|order is placed it cannot be cancelled or returned.|Y
01|55540|1|1|250MM Manual Tilting Rotary table with CONTROLLER|Y
01|55540|1|2|ACTUAL PART # NST-250A21|Y
01|55540|1|3|PRICE IS CORRECT|Y
01|55558|1|1|Tooling Certificate Number: 13170-755-03152016|Y
01|55558|7|1|NCAT50-SK16C-105U-J SK16 Slim Chuck with Coolant Nut|Y
01|55558|7|2|SKN-16BJ installed at Lyndex-Nikken prior to shipping.|Y
01|55558|8|1|This nut will be installed on NCAT50-SK16C-105U prior|Y
01|55558|8|2|to shipment and become NCAT50-SK16C-105U-J.|Y
01|55567|1|1|NCAT50-C2-125U  Milling Chuck CAT50 Taper Plus|Y
01|55567|1|2|2.0 x 125mm gage length|Y
01|55583|2|1|Installation Includes: drive amp bulk head cable set|Y
01|55583|2|2|external cable set communication cable parameter|Y
01|55583|2|3|changes travel and labor for installation of two|Y
01|55583|2|4|rotary tables on one new VC-510 machine.|Y
01|55583|3|1|Includes: Air cylinder drawbar collet nose air valve|Y
01|55593|1|1|HFO TAMPA TO SUPPLY MOTOR AND CABLES|Y
01|55593|1|3|5 TABLE AVAILABLE IN 3-4 WEEKS|Y
01|55593|1|4|TAILSTOCK DELIVERY 4 WEEKS POSSIBLY|Y
01|55599|3|1|below chuck adapter plate and tailstock included N/C|Y
01|55606|1|1|Part# A2-8|Y
01|55627|5|1|IMTS PROMO|Y
01|55628|1|1|18pcs ETA approx 2wks remaining bal pending per factory|Y
01|55628|3|1|2stk 4pcs ETA approx 1-2 weeks|Y
01|55628|6|1|1pc stk remainder ETA approx 6-7wks|Y
01|55633|1|1|Will come with 2 40 taper pots.|Y
01|55633|1|2|Includes 1 Cool Station|Y
01|55633|2|1|Will come with 2 40 taper pots.|Y
01|55633|2|2|Includes 1 Cool Station|Y
01|55633|4|1|Comes with one 40 taper pot|Y
01|55633|4|2|IMTS SPECIAL|Y
01|55633|5|1|3rd Fan per customer is requested|Y
01|55633|6|1|1x pot for SF machine 3x pots for each Cool Station|Y
01|55633|7|1|1x pot for SF machine 3x pots for each Cool Station|Y
01|55639|1|1|Hard Jaw Part #HW32RJ  1-set = 3-pieces|Y
01|55639|1|2|Net price quoted is based upon a one time|Y
01|55639|1|3|purchase order to be released in full quantity upon|Y
01|55639|1|4|receipt of jaws at Lyndex-Nikken.|Y
01|55639|1|5|This quotation is valid for 30 days.|Y
01|55639|2|1|Above pricing is for 6 sets purchased at same time|Y
01|55639|2|2|Hard Jaw Part #HW32RJ  1-set = 3-pieces 6 sets=18pcs|Y
01|55644|1|1|This is a non standard stock item once a purchase|Y
01|55644|1|2|order is placed it cannot be cancelled or returned.|Y
01|55648|1|1|Reference RGA# R-48399|Y
01|55648|1|2|C40RAM-ER16-180 s/n: 655301|N
01|55648|3|1|Bearings seals and o-rings must be replaced.|Y
01|55648|3|2|Labor is included.|Y
01|55666|1|1|3P-T2|Y
01|55666|1|2|Nikken BCB29 Insert for Stainless Steel|Y
01|55666|1|3|Sold in pack of 10PCS|Y
01|55666|1|4|Quoted at a net price|Y
01|55666|2|1|This item is non-cancellable and Non-Returnable|Y
01|55666|2|2|Quoted at NET price.|Y
01|55666|3|1|Quoted at a net price|Y
01|55685|3|1|wrench needed for holder above|Y
01|55704|1|1|Reference RGA# T-48425|Y
01|55704|1|2|5AX-130 s/n: 1956|N
01|55725|1|1|Both Power/Signal and Feedback ext. cables for a|Y
01|55725|1|2|CNC401OSP2-M Serial#8924 - Mears Machine.|Y
01|55753|1|1|A2-8 (A8J) Adapter Plate for HW-12-2J3J-HS Chuck|Y
01|55753|2|1|Max Chuck ID Bore is 55mm|Y
01|55753|2|2|1pc currently in stock in Japan. If shipped by Air ETA|Y
01|55753|2|3|is aprox 10 days. Air shipping cost to be determined|Y
01|55753|2|4|upon ship time.|Y
01|55753|3|1|JFB-2766/2767 Draw Tube Mori Seiki NLX2500/3000|Y
01|55753|3|2|Howa Chuck H023M12 Chuck (M65x2P)|Y
01|55759|1|1|L Dimension needs to be 190mm +/- .001 (gage length of|Y
01|55759|1|2|the holders must be held within +/- .001)|Y
01|55764|1|1|Table with Fanuc Motor - Air Clamp|Y
01|55764|1|2|Hydraulic Clamp is available but will require a unit or|Y
01|55764|1|3|booster.|Y
01|55764|2|1|Installation Includes: Drive Amp Bulkhead Cable Set|Y
01|55764|2|2|External Cable Set Communication Cable Parameter|Y
01|55764|2|3|Changes Travel and Labor for installation of one|Y
01|55764|2|4|rotary table on one new Hargine VMC.|Y
01|55766|2|1|To be Jet Slot Modified - C5016-0500-4.00-JS|Y
01|55766|2|2|Pricing based on 10pcs being modified.|Y
01|55766|3|1|Jet Slot modification of 10pcs C5016-0500-4.00 above|Y
01|55770|1|1|Pricing based on 1-2PC|Y
01|55770|2|1|Pricing based on 3-4PC|Y
01|55770|3|1|Pricing based on 5+PCS|Y
01|55771|2|1|2-100MM four spindle tables for the R650X1|Y
01|55771|3|1|2-100MM three spindle tables for the R450X1|Y
01|55771|4|1|1-100MM four spindle table for the S700X1|Y
01|55790|2|1|Increased discount to avoid a return/repair|Y
01|55793|5|1|*replaces OKEX-ER32X-C-2MP|Y
01|55811|5|1|H10ARAM-ER16-127ST-110TP  HSK100A ER16 AH 5 GL SPECIAL|Y
01|55811|6|1|Custom Positioning Block for EU Machine Make/Model|Y
01|55831|1|1|Quoted at a net price|Y
01|55831|2|1|Quoted for consideration|Y
01|55852|1|1|Service Call completed on 5AX-T400-780FA by Armando|Y
01|55852|1|2|Meno on 7/25/16 - 7/26/16.|Y
01|55852|2|1|Hotel: $159.24|Y
01|55852|2|2|Gas Per Mileage: 862 RT x .565 per mile = $487.03|Y
01|55852|2|3|Meal Per day: $50.00 x 2 = $100.00|Y
01|55852|2|4|Transit time: 15.33 hours x $100.00 per hour = $1533.00|Y
01|55861|1|1|Shrink fit unit alone|Y
01|55861|2|1|Shrink fit unit + 10 standard GL NCAT50 tool holders|Y
01|55867|5|2|DELIVERY 3-4 WEEK (OR BETTER)AIR DIRECT TO AZIMUTH|Y
01|55867|5|3|FROM FACTORYY|Y
01|55867|7|1|$ 10000.00 FACE VALUE TOOL CERT (NO CHARGE)|Y
01|55869|2|1|Table is hydraulic clamp for Brake both axis|Y
01|55869|2|2|Hydraulic unit below needed|Y
01|55869|2|3|APPROX 2X BRAKE CLAMP BOTH AXIS WITH HYD CLAMPING|Y
01|55869|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|55869|11|1|THIS MODEL air brake only. BASED ON APPLICATION|Y
01|55883|1|1|Service Call for various tables completed by|Y
01|55883|1|2|Armando Mena and Gustavo Vazquez 7/18/16 - 7/22/16.|Y
01|55883|2|1|Transit time: 15hrs x 2 Techs= 30hrs x $100/hr=$3000.00|Y
01|55883|2|2|Gas Per Miles: 752mi x .565/mi = $424.88|Y
01|55883|2|3|Hotel x2 Techs (7/18-7/22): 2 rooms x 717.10 = $1434.20|Y
01|55883|2|4|Meals x2 Techs 5 Days: $100.00/day x 5 days = $500.00|Y
01|55883|3|1|32 Hours of Labor x 2 Technicians = 64 Hours of Labor|Y
01|55892|1|1|Reference RGA# T-48429|Y
01|55892|1|2|CNC320VLFA s/n: 2984|N
01|55892|26|1|Pricing reflects sand blasting priming and painting|Y
01|55892|26|2|of CNC320VLFA s/n: 2984|Y
01|55893|1|1|Part# A2-8|Y
01|55893|2|1|CHUCK ID BORE 55MM|Y
01|55893|3|1|@@@@@ MAKE NOTE PRICE IS NET!!!!!!|Y
01|55893|3|2|Howa Chuck H023M12 Chuck (M65x2P)|Y
01|55894|1|1|New table with Fanuc motors|Y
01|55894|2|1|Installatin Includes: Drive amp bulkhead cable set|Y
01|55894|2|2|external cable set communication cable parameter|Y
01|55894|2|3|changes travel and labor for installing one 5AX table|Y
01|55894|2|4|on one new Doosan DNM 400.|Y
01|55895|1|1|New table with Fanuc motors. - 1 Year Warranty|Y
01|55895|2|1|Refurbished table with Fanuc motors. - 1 Year Warranty|Y
01|55895|3|1|Installation includes: Drive amp bulkhead cable set|Y
01|55895|3|2|external cable set communcation cable parameter|Y
01|55895|3|3|changes travel and labor for installation of two 5AX|Y
01|55895|3|4|tables on one new Doosan VC-510 machine.|Y
01|55923|5|1|to be determine dimension|Y
01|55923|5|2|thickness of plate needed|Y
01|55923|6|1|CABLE TO BE CONFIRMED|Y
01|55923|9|1|complete 4th axis interface including driveinternal|Y
01|55923|9|2|cables fiber optics connectors management|Y
01|55923|9|3|travel and labor.|Y
01|55923|9|4|machine data sheets required|Y
01|55928|1|1|Hot Deal-Non-returnable Non-Cancellable|Y
01|55940|1|1|*Quoted at Net Price|Y
01|55940|1|2|*Unit is non-returnable and non-cancellable|Y
01|55941|21|1|*******FREE*****|Y
01|55965|1|1|Table with Okuma motors and air brakes.|Y
01|55965|1|2|This table can be set up for hydraulic braking but|Y
01|55965|1|3|would require the addition of a hydraulic unit.|Y
01|55966|1|1|Table with Okuma motor.|Y
01|55968|1|1|Part# NBT30-HC10-90|Y
01|55968|2|1|Part# NBT30-HC18-90|Y
01|55968|3|1|Part# NBT30-HC25-105|Y
01|55968|4|1|Part# NBT30-HC32-105|Y
01|55969|1|1|CNCZ180SABR2-QT Set 2-CNC180SABR2 tables with R650X1|Y
01|55969|1|2|installation package.|Y
01|55970|1|1|If we modify 1 to 2 weeks/Factory Made 13 weeks.|Y
01|55999|1|1|This item is non-returnableNon-cancelable|Y
01|56002|3|1|This line is referenced at your NET cost|Y
01|56005|2|1|THIS TABLE HAS HYD. BRAKE CLAMPING/ WILL NEED HYD UNIT|Y
01|56005|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|56005|11|1|THIS TABLE HAS AIR BRAKE.|Y
01|56005|18|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|56005|18|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|56005|18|3|THIS COST DOES NOT INCLUDE ANY PARAMETERS THAT FANUC|Y
01|56005|18|4|MAY NEED TO INSTALL. THIS CANNOT BE DETERMINED TILL|Y
01|56005|18|5|WE RECEIVE MACHINE DATA SHEETS ARE RECEIVED|Y
01|56005|18|6|THERE IS A POSSIBILITY THAT OUR TECH WILL BE ABLE TO|Y
01|56005|18|7|TURN ON.|Y
01|56009|1|1|Quoted at a net price|Y
01|56016|1|1|Tooling Certificate Number: 25000-813-072016|Y
01|56039|12|1|CAT40U-AH-160-90: Main spindle shaft|Y
01|56044|1|1|Delivery is 15 to 16 weeks after approval drawing is|Y
01|56044|1|2|received.|Y
01|56044|4|1|Delivery is 15 to 16 weeks after approval drawing is|Y
01|56044|4|2|received.|Y
01|56044|7|1|OKEX-CAPTO4Z-MS|Y
01|56044|7|2|Delivery is 15 to 16 weeks after approval drawing is|Y
01|56044|7|3|received.|Y
01|56044|10|1|OKEX-CAPTO4Z-MS  Capto C4 Z-Axis Main/Sub Output|Y
01|56044|10|2|Ext Coolant Max 6500rpm 50Nm|Y
01|56044|10|3|Minimum order 2 pieces.|Y
01|56044|11|1|OKEX-CAPTO4X-C-MIM  Capto C4 X-Axis Int Coolant|Y
01|56044|11|2|Max 6500.00rpm 80Nm|Y
01|56044|11|3|Minimum order is 2 pieces.|Y
01|56044|13|1|OKEX-CAPTO4Z-C-MIM  Capto C4 Z-Axis Int Coolant|Y
01|56044|13|2|Max 6500rpm 50Nm|Y
01|56044|13|3|Minimum order is 2 pieces.|Y
01|56047|1|1|BT50-ZMAC70-240|Y
01|56047|2|1|BT50-ZMAC85-225|Y
01|56047|3|1|BT50-ZMAC100-225|Y
01|56047|4|1|6MP-C4(PV90) Insert for all above sold in 10pc set only|Y
01|56049|1|1|Custom Positioning Blocks per specs provided by Brad|Y
01|56049|1|2|Hodge of Caterpillar.|Y
01|56051|2|1|PRICE REFLECTS SPECIAL DISCOUNT WITH CORE TRADE IN|Y
01|56054|1|1|3pcs stk 2pcs eta pending per factory|Y
01|56067|1|1|Sauter VDI40  DIN 5480 Live Tool>>Straight X-Axis|Y
01|56067|1|2|(Radial) Tool Capto C4 Output IntC 6500 RPM Max|Y
01|56067|1|3|(10000 Max 2min)|Y
01|56067|1|4|Net price quoted for 1 to 2 holders.|Y
01|56067|2|1|Sauter VDI40  DIN 5480 Live Tool>>Straight X-Axis|Y
01|56067|2|2|(Radial) Tool Capto C4 Output IntC 6500 RPM Max|Y
01|56067|2|3|(10000 Max 2min)|Y
01|56067|2|4|Net price quoted for 3 to 4 holders.|Y
01|56067|4|1|Sauter VDI40 DIN5480 Live Tool Straight X-Axis(Radial)|Y
01|56067|4|2|Tool ER32 Output IntC 6500RPM Max(10000 Max-2 Min)|Y
01|56067|4|3|Net price quoted for 1 to 2 holders.|Y
01|56067|5|1|Sauter VDI40 DIN5480 Live Tool Straight X-Axis(Radial)|Y
01|56067|5|2|Tool ER32 Output IntC 6500RPM Max(10000 Max-2 Min)|Y
01|56067|5|3|Net price quoted for 3 to 4 holders.|Y
01|56067|6|1|Sauter VDI40 DIN5480 Live Tool Straight X-Axis(Radial)|Y
01|56067|6|2|Tool ER32 Output IntC 6500RPM Max(10000 Max-2 Min)|Y
01|56067|6|3|Net price quoted for 3 to 4 holders.|Y
01|56067|9|1|Sauter VDI40 DIN5480 Live Tool Straight X-Axis(Radial)|Y
01|56067|9|2|ToolER40 Output IntC 6500 RPM Max|Y
01|56067|9|3|Net price quoted for 1 to 2 holders.|Y
01|56067|10|1|Sauter VDI40 DIN5480 Live Tool Straight X-Axis(Radial)|Y
01|56067|10|2|ToolER40 Output IntC 6500 RPM Max|Y
01|56067|10|3|Net price quoted for 3 to 4 holders.|Y
01|56083|13|1|6MP-C4(PV90) Insert for all above sold in 10pc set only|Y
01|56084|1|1|For 5AX-2MT-105-120SA-BR2 table|Y
01|56093|1|1|This is a Weekly rental price.  User is responsible|Y
01|56093|1|2|for any damage to the head while renting it normal use|Y
01|56093|1|3|should not cause any damage to the head.|Y
01|56095|2|1|FREE $1K Tooling Certificate good for list price tool|Y
01|56095|2|2|holders.|Y
01|56100|1|1|Table with Okuma motor.|Y
01|56100|2|1|Pneumatic actuation with MT#3 center sockets.|Y
01|56100|2|2|Centerline and Spacing with match rotary table.|Y
01|56100|3|1|Hand Valve for actuating pheumatic tailstocks.|Y
01|56106|4|1|Alternative to PS-16|Y
01|56114|1|1|Reference RGA# TOR-48552|Y
01|56114|1|2|B4005-0875-6.34|N
01|56114|5|1|Labor rate is $110.00/hour.|Y
01|56114|5|2|Pricing reflects 1.5 hours of labor.|Y
01|56123|1|1|Reference RGA# R-48440|Y
01|56123|1|2|C40RA-0025|N
01|56126|1|1|This price is to purchase old demo unit originally|Y
01|56126|1|2|offered on a consignment.|Y
01|56126|2|1|This price is for a brand new demo unit to be sold on|Y
01|56126|2|2|consignment.|Y
01|56129|1|1|Custom Reamer Holding Tool per STF-14697 drawing|Y
01|56129|1|2|provided.|Y
01|56129|2|1|Custom Reamer Holding Tool per STF-14697 drawing|Y
01|56129|2|2|provided.|Y
01|56129|3|1|Custom Reamer Holding Tool per STF-14697 drawing|Y
01|56129|3|2|provided.|Y
01|56157|6|1|Hot Deal|Y
01|56184|1|1|Hot Deals|Y
01|56198|1|1|Table with Fanuc motor.|Y
01|56198|2|1|Table with Fanuc motor.|Y
01|56198|3|1|External Cable - Power/Signal - 2 Meters Long|Y
01|56198|3|2|Use for either table.|Y
01|56198|4|1|External Cable - Feedback - 2 Meters Long.|Y
01|56198|4|2|Use for either table.|Y
01|56217|1|1|Discount reflects purchase of 4 nuts.|Y
01|56220|1|1|This head is in stock in Chicago and can ship right|Y
01|56220|1|2|away.|Y
01|56220|1|3|This head does not have internal coolant or support|Y
01|56220|1|4|pins.  It is external coolant only.|Y
01|56220|2|1|Positioning Block for HAAS VF6|Y
01|56226|1|1|Nikken table does not have servo motor|Y
01|56228|5|2|DELIVERY 3-4 WEEK (OR BETTER)AIR DIRECT TO AZIMUTH|Y
01|56228|5|3|FROM FACTORYY|Y
01|56228|7|1|$ 10000.00 FACE VALUE TOOL CERT (NO CHARGE)|Y
01|56234|3|1|Direct mount metal braided cable set.|Y
01|56234|4|1|Direct mount metal braided cable set.|Y
01|56238|3|1|Installation includes: Drive unit short bar fiber|Y
01|56238|3|2|optic cable communications cable bulkhead cable set|Y
01|56238|3|3|external cable set parameter changes service time and|Y
01|56238|3|4|travel.|Y
01|56242|9|1|15pcs ETA 1-2 weeks /Balance ETA aprox 13 weeks|Y
01|56248|3|1|Installation includes: Bulkhead cable set external|Y
01|56248|3|2|cable set parameter changes service time and travel.|Y
01|56248|4|1|Installation includes: Drive unit short bar fiber opt|Y
01|56248|4|2|optic cables communications cable bulkhead cables|Y
01|56248|4|3|external cables paramter changes service time and|Y
01|56248|4|4|travel.|Y
01|56256|1|1|To be used in a 3/4 hyudraulic chuck.  Tool shank must|Y
01|56256|1|2|have H6 tolerance.|Y
01|56269|7|1|NOTE: Please advise the tool they are using these|Y
01|56269|7|2|nuts on? Thie nut is a non standard stock item once|Y
01|56269|7|3|a purchase order is placed it cannot be cancelled or|Y
01|56269|7|4|returned.|Y
01|56278|4|1|**Free pull stud to match qty of matching holders|Y
01|56302|1|1|Sauter VDI40 DIN5482 Live Tool ER32 Output 90 Deg Ext|Y
01|56302|1|2|Coolant|Y
01|56324|5|1|This price reflects Shrink Fit Machine with 10 CAT40|Y
01|56324|5|2|holders customers choice from the Lyndex-Nikken list.|Y
01|56324|9|1|This price reflects Shrink Fit Machine with 10 CAT50|Y
01|56324|9|2|holders customers choice from the Lyndex-Nikken list.|Y
01|56335|1|1|Quoted at a net price|Y
01|56336|1|1|Pricing for 1-4PCS|Y
01|56336|2|1|Pricing for 5-9PCS|Y
01|56336|3|1|Pricing for 10+PCS|Y
01|56336|4|1|Wrench for C4017-0011-4.00B|Y
01|56339|1|1|Reference RGA# TAR-48511|Y
01|56339|1|2|5AX-300 s/n: 4030|N
01|56339|32|1|Rotary Axis wire harness|Y
01|56339|33|1|Tilt Axis wire harness|Y
01|56348|1|1|Discount relects purchase of 1 unit|Y
01|56348|3|1|Discount reflects purchse of 2 units.|Y
01|56362|1|1|Reference RGA# T-47854|Y
01|56362|1|2|CNC260 s/n: 5657H|N
01|56363|71|1|Reference RGA# T-47998|Y
01|56363|71|2|CNC260 s/n: 6665|N
01|56365|1|1|Reference RGA# T-47854 & T-47998|Y
01|56365|37|1|Reference RGA# T-47854|Y
01|56365|37|2|CNC260 s/n: 5657H|N
01|56365|71|1|Reference RGA# T-47998|Y
01|56365|71|2|CNC260 s/n: 6665|N
01|56399|1|1|Reference RGA# TAR-48558|Y
01|56399|1|2|CNCZ180LSA3 s/n: 5087|N
01|56402|1|1|AC4-MTA1-90 Capto 4 Morse Taper MT1|Y
01|56402|2|1|AC4-MTA2-95 Capto 4 Morse Taper MT2|Y
01|56402|3|1|AC4-MTA3-115  Capto 4 Morse Taper MT3|Y
01|56404|1|1|Reference RGA# T-48461|Y
01|56404|1|2|NCTZ150FA s/n: 8081|N
01|56404|24|1|AB1531EO: Oil Seal|Y
01|56404|28|1|Pricing reflects plating and re-grinding of spindle.|Y
01|56408|1|1|Quoted at a net price|Y
01|56453|1|1|MS103-13020: Spindle|Y
01|56458|8|1|Brad will call back with specific collet sizes. 32% off|Y
01|56458|8|2|on all SK20 and ER32 collets|Y
01|56459|2|1|Sub Plate included|Y
01|56513|1|1|EMAG VDI50 ER32 Striaght Live Tool p/n:123930|Y
01|56513|2|1|EMAG VDI50 ER32n Straight Live Tool Internal Coolant|Y
01|56513|2|2|p/n:124329|Y
01|56538|1|1|ETA approx 4 weeks|Y
01|56539|1|1|1pc STOCK|Y
01|56539|1|2|*2nd - 3rd Piece: 4-5 weeks|Y
01|56539|1|3|*4th Piece: 8-9 weeks|Y
01|56548|11|1|HSK100A-C32-115G  32mm Milling Chuck High Speed|Y
01|56550|57|1|*used for M7 M8|Y
01|56556|2|1|Promo price of $5.00 w/ purchase of matching BT30 tool|Y
01|56570|1|1|Reference RGA# TOR-48545|Y
01|56570|1|2|C4005-0875-6.66|N
01|56570|5|1|Labor is $110.00/hour. Pricing reflects 1.5 hours|Y
01|56570|5|2|of labor.|Y
01|56573|1|1|Tool Number 1|Y
01|56573|3|1|Tool Number 2|Y
01|56573|4|1|Tool Number 2|Y
01|56573|5|1|Tool Number 2|Y
01|56573|7|1|Tool Number 3|Y
01|56573|8|1|Tool Number 3|Y
01|56573|9|1|Tool Number 3|Y
01|56573|11|1|Tool Number 4|Y
01|56573|12|1|Tool Number 4|Y
01|56573|13|1|Tool Number 4|Y
01|56573|15|1|Tool Number 5|Y
01|56573|16|1|Tool Number 5|Y
01|56573|18|1|Tool Number 6|Y
01|56573|19|1|Tool Number 6|Y
01|56573|20|1|Tool Number 6|Y
01|56573|22|1|Tool Number 7|Y
01|56573|23|1|Tool Number 7|Y
01|56573|24|1|Tool Number 7|Y
01|56573|26|1|Tool Number 8|Y
01|56573|27|1|Tool Number 8|Y
01|56573|29|1|Tool Number 9|Y
01|56573|30|1|Tool Number 9|Y
01|56573|31|1|Tool Number 9|Y
01|56573|33|1|Tool Number 10|Y
01|56573|34|1|Tool Number 10|Y
01|56573|35|1|Tool Number 10|Y
01|56573|37|1|Tool Number 11|Y
01|56573|38|1|Tool Number 11|Y
01|56573|39|1|Tool Number 11|Y
01|56573|41|1|Tool Number 14|Y
01|56573|42|1|Tool Number 14|Y
01|56573|43|1|Tool Number 14|Y
01|56573|45|1|Tool Number 15|Y
01|56573|46|1|Tool Number 15|Y
01|56573|48|1|Tool Number 16|Y
01|56573|49|1|Tool Number 16|Y
01|56573|50|1|Tool Number 16|Y
01|56573|52|1|Tool Number 18|Y
01|56573|53|1|Tool Number 18|Y
01|56573|55|1|Tool Number 19|Y
01|56573|56|1|Tool Number 19|Y
01|56573|57|1|Tool Number 19|Y
01|56573|59|1|Tool Number 20|Y
01|56573|60|1|Tool Number 20|Y
01|56573|61|1|Tool Number 20|Y
01|56573|63|1|Tool Number 22|Y
01|56573|64|1|Tool Number 22|Y
01|56573|65|1|Tool Number 22|Y
01|56573|67|1|Tool Number 23|Y
01|56573|68|1|Tool Number 23|Y
01|56573|69|1|Tool Number 23|Y
01|56573|71|1|Tool Number 24|Y
01|56573|72|1|Tool Number 24|Y
01|56573|73|1|Tool Number 24|Y
01|56584|1|1|Pricing for 1PC|Y
01|56584|2|1|Pricing for 3+PCS|Y
01|56584|4|1|Pricing for 1 PC|Y
01|56584|5|1|Pricing for 3+ PCS|Y
01|56584|7|1|Pricing for 1PC|Y
01|56584|8|1|Pricing for 3+ Pieces|Y
01|56587|1|1|HW-04-HS-SP Howa PowerChuck H037M4 N-1792|Y
01|56600|1|1|T-Nut for H027M15 / LN#HW-TN1-15-HS  2pcs per set|Y
01|56624|1|1|For Tool Package on Quotation# 56582|Y
01|56643|2|1|1.75 GL Projection|Y
01|56643|2|2|Promotional Limited Time Offer|Y
01|56653|1|1|Table with HAAS motors and cables - AIR BRAKE|Y
01|56653|2|1|*OPTIONAL* - On-Site Installation Support Includes:|Y
01|56653|2|2|A service tech to come on site and help with table|Y
01|56653|2|3|installation and parameter changes for one 5AX table on|Y
01|56653|2|4|one HAAS VF3SS.|Y
01|56669|1|1|Table with Okuma motor and hydraulic brake.|Y
01|56669|2|1|Hydraulic Tailstock with matching center height to|Y
01|56669|2|2|rotary table.|Y
01|56669|3|1|500 PSI unit and tank for table brake system and|Y
01|56669|3|2|tailstock actuation.|Y
01|56669|4|1|16 Scroll Chuck with adapter plate.|Y
01|56669|5|1|Manual hand valve for tailstock function.|Y
01|56674|8|1|This line is referenced at your NET cost|Y
01|56682|6|1|*substitute|Y
01|56682|16|1|*substitute|Y
01|56692|4|1|Subplate for table+tailstock|Y
01|56696|3|1|3 port rotary union included with the rotary table|Y
01|56698|1|1|6 Will come equipped with Coolant Nut|Y
01|56698|2|1|6 will come equipped with coolant nut|Y
01|56698|12|1|FREE STUDS|Y
01|56698|13|1|FREE WRENCHES|Y
01|56709|57|1|*used for M7 M8|Y
01|56711|1|1|1600MM table with Alpha 30/3000i motor.|Y
01|56711|1|2|Angle plate provided by Dril-Quip for vertical use.|Y
01|56711|1|3|500PSI hydraulic source with solenoid and pressure|Y
01|56711|1|4|switches to be provide by Dril-Quip.|Y
01|56711|1|5|Integration and installation is the responiblity of|Y
01|56711|1|6|Dril-Quip.|Y
01|56711|3|1|Power/Signal and Feedback cables to yet to be|Y
01|56711|3|2|determined lenght.|Y
01|56711|3|3|Wiring diagram to be provided by Dril-Quip|Y
01|56713|1|1|Wrenches and case included|Y
01|56717|1|1|Reference RGA# LVR-48576|Y
01|56717|1|2|OKU-L470-Z s/n: AL214|N
01|56717|3|1|Collet nut bearings seals and o-rings must be|Y
01|56717|3|2|replaced. Labor is included.|Y
01|56722|1|1|Wrenches and case included|Y
01|56726|1|1|Wrenches and case included|Y
01|56733|2|1|Sub with FK-8|Y
01|56741|1|1|*Qty Break Pricing:  1pc|Y
01|56741|2|1|*Qty Break Pricing:  2pc Mim|Y
01|56742|1|1|T32206|Y
01|56742|4|1|48-71863|Y
01|56742|5|1|Please Note: We do not carry a 32mm adjustable cut off|Y
01|56742|5|2|holder. Quoted as 1.1/4  and is not adjustable.|Y
01|56742|6|1|T00199|Y
01|56749|1|1|Reference RGA# LVR-48565|Y
01|56749|1|2|OKL3-ER32X s/n: AL743|N
01|56749|3|1|Clutch and gears are damaged and must be replaced.|Y
01|56749|3|2|Collet nut bearings seals and o-rings must be|Y
01|56749|3|3|replaced. Labor is included.|Y
01|56753|2|1|With Core Trade In Program the EU gets 25% off of list|Y
01|56753|2|2|and DMC gets the other 20% discount.|Y
01|56757|5|1|Manual Tailstock for CNC(z)202|Y
01|56757|6|1|Air Actuated Tailstock for CNC(z)202|Y
01|56757|7|1|Manual Tailstock for CNC(z)260|Y
01|56757|8|1|Air Actuated Tailstock for CNC(z)260|Y
01|56757|9|1|Power/Signal and Feedback External Cable Set|Y
01|56757|9|2|Length to be verified at time of order.|Y
01|56757|10|1|Installation of above table on a Toyoda FV1165-50 VMC|Y
01|56757|10|2|Fanuc 18iMB Control|Y
01|56757|10|3|Installation includes all necessary items to complete|Y
01|56757|10|4|installation - Customer to confirm Machine 4th Axis|Y
01|56757|10|5|Ready via Data Sheets/Fanuc Option Parameter.|Y
01|56761|1|1|Reference RGA# LVR-48555|Y
01|56761|1|2|C40RAM-ER20-225ST s/n: 7161 02|N
01|56761|4|1|Bearings seals and o-rings are worn and must be|Y
01|56761|4|2|replaced. Labor is included.|Y
01|56781|1|1|12 Chuck Adapter Plates for Okuma 2SP-V40.|Y
01|56781|1|2|Chuck ser# H01MA12|Y
01|56781|1|3|1pc currently in stock in IL/Balance ETA aprox 8-9 wks|Y
01|56781|1|4|manufacturing plus additional for shipping depending on|Y
01|56781|1|5|method used.|Y
01|56799|3|1|750TL-2(C) Coolant Back up Screw for BT30 C3/4 Milling|Y
01|56799|3|2|Chuck. Can use in a non-coolant situation.|Y
01|56809|1|1|High Speed Rotary Table with 180mm Faceplate.|Y
01|56809|1|2|OPTION #1|Y
01|56809|2|1|Standard Speed Rotary Table with 300mm Faceplate.|Y
01|56809|2|2|OPTION #2|Y
01|56809|3|1|Installation Includes: Drive amps bulkhead cable set|Y
01|56809|3|2|external cable sets communication cable parameter|Y
01|56809|3|3|changes travel and labor for installing two rotary|Y
01|56809|3|4|tables on one new Kitamura 2XDSP machine.|Y
01|56814|2|1|Includes Mori I/O unit FCU7-DX079 and Extension Unit|Y
01|56817|1|1|Red and Blue air lines and metal spring covers to go|Y
01|56817|1|2|from CNC180 to TAT-170 on Okuma M560. Also includes 4|Y
01|56817|1|3|90 degree swivel air fittings for table and TAT connect|Y
01|56818|4|1|Modification of Pancake Cylinder with addition of 1/2|Y
01|56818|4|2|thru hole. (Provided by third party)|Y
01|56818|5|1|16C Collet Closer - To be actuated by hydraulic|Y
01|56818|5|2|pancake cylinder (Provided by third party)|Y
01|56818|6|1|Foot Pedal for cylinder actuation|Y
01|56819|1|1|Pricing for 1-2PCS|Y
01|56822|14|1|IMTS PROMO APPLIED ON RETENTION KNOBS.|Y
01|56829|2|1|Discount reflects purchase order of 6 to 10 holders.|Y
01|56829|5|1|Discount reflects purchase order of 1 to 5 holders.|Y
01|56833|2|1|Installation includes: Drive unit short bar fiber|Y
01|56833|2|2|optic cable communications cable bulk head cable set|Y
01|56833|2|3|external cable set parameter changes service time &|Y
01|56833|2|4|travel|Y
01|56836|2|1|Do not offer collet set in SK6.|Y
01|56842|1|1|Start2 Shrink fit unit + 10 std GL HSK63A SF holders|Y
01|56842|2|1|Fi-5b Shrink fit unit + 10 std GL HSK63A SF holders|Y
01|56842|3|1|Includes presetting unit for Fi-5b SF machine 3 rods|Y
01|56842|3|2|ruler indicator set of 6 guides and guide holder.|Y
01|56846|5|1|This line at no charge|Y
01|56864|25|1|Retention studs no quote|Y
01|56864|25|2|Please purchase thru Retention Knob supply|Y
01|56885|1|1|Reference RGA# R-48438|Y
01|56885|1|2|OKL3-ER32X s/n: AL0341|N
01|56885|3|1|Clutch is damaged and must be replaced. Collet nut|Y
01|56885|3|2|bearings seals and o-rings must also be replaced.|Y
01|56885|3|3|Labor is included.|Y
01|56885|5|1|OKL3-ER32Z a/n: AL0240|N
01|56885|7|1|Clutch is damaged and must be replaced. Collet nut|Y
01|56885|7|2|bearings seals and o-rings must also be replaced.|Y
01|56885|7|3|Labor is included.|Y
01|56916|1|1|Hard Balance customer's BT30 SMH w/ face mills|Y
01|56916|1|2|provided by SMC.|Y
01|56916|1|3|Hard balance assembly to 12000RPM|Y
01|56925|1|1|Table with Fanuc motor and Hydraulic Brake.|Y
01|56925|2|1|Booster for Hydraulic Brake - To be mounted under motor|Y
01|56925|2|2|cover.|Y
01|56925|3|1|Installation Includes: Drive amps bulkhead cable set|Y
01|56925|3|2|external cable sets communication cable parameter|Y
01|56925|3|3|changes travel and labor for installation of 2 rotary|Y
01|56925|3|4|tables on one NHP5500 machine.|Y
01|56926|3|1|PART # TCE-95947-XXXXR|Y
01|56926|3|2|LENGTH TBD|Y
01|56926|4|1|PART # TCE-95951-XXXXR|Y
01|56926|4|2|LENGTH TBD|Y
01|56926|5|1|PART # TCE-95948-XXXXT|Y
01|56926|5|2|LENGTH TBD|Y
01|56926|6|1|PART # TCE-95952-XXXXT|Y
01|56926|6|2|LENGTH TBD|Y
01|56926|7|1|2 PCS FOR 5AX-2MT|Y
01|56926|7|2|4 PCS FOR 5AX-4MT|Y
01|56926|8|1|2 PCS FOR 5AX-2MT|Y
01|56926|8|2|4 PCS FOR 5AX-4MT|Y
01|56926|9|1|2 PCS FOR 5AX-2MT|Y
01|56926|9|2|4 PCS FOR 5AX-4MT|Y
01|56926|10|1|For 5AX-4MT 24V|Y
01|56926|11|1|FOR 5AX-4MT 110V|Y
01|56927|4|1|FEEDBACK CABLE TO BE CONFIRMED FOR TILT AND ROTARY|Y
01|56927|4|2|AXIS|Y
01|56927|6|1|POWER CABLE FOR TILT AND ROTARY AXIS TO BE CONFIRMED|Y
01|56927|12|1|FOR 5AX-4MT 110V|Y
01|56927|14|1|4+1 INSTALLATION (MACHINE AND CONTROL TO BE DETERMINED|Y
01|56927|14|2|SHOULD NOT AFFECT QUOTE|Y
01|56927|14|3|INSTALLATION INCLUDES HARDWARE INTERNAL CABLES. FIBER|Y
01|56927|14|4|OPTIC CABLEDUAL DRIVE TRAVEL LABOR|Y
01|56927|14|5|MACHINE DATA SHEETS REQUIRED FOR INSTALL|Y
01|56928|4|1|FEEDBACK CABLE TO BE CONFIRMED FOR TILT AND ROTARY|Y
01|56928|4|2|AXIS|Y
01|56928|6|1|POWER CABLE FOR TILT AND ROTARY AXIS TO BE CONFIRMED|Y
01|56928|12|1|FOR 5AX-4MT 110V|Y
01|56928|14|1|4+1 INSTALLATION (MACHINE AND CONTROL TO BE DETERMINED|Y
01|56928|14|2|SHOULD NOT AFFECT QUOTE|Y
01|56928|14|3|INSTALLATION INCLUDES HARDWARE INTERNAL CABLES. FIBER|Y
01|56928|14|4|OPTIC CABLEDUAL DRIVE TRAVEL LABOR|Y
01|56928|14|5|MACHINE DATA SHEETS REQUIRED FOR INSTALL|Y
01|56929|3|1|WITHOUT EXTERNAL CABLES|Y
01|56930|1|1|THIS TABLE IDENTICAL TO TABLE WE JUST SUPPLIEDN MAZAK|Y
01|56930|1|2|SOLENOID 100VAC AND CONFIRM DUPLICATE WIRING|Y
01|56931|1|1|MACHINE MUST HAVE 4TH AXIS INTERFACE INSTALLED|Y
01|56931|1|2|LYNDEX NIKKEN RESPONSIBLE FOR TABLE SERVO & EXTERNAL|Y
01|56931|1|3|CABLES. NO WORKHOLDING FIXTURE QUOTED|Y
01|56932|11|1|THIS TABLE HAS AIR BRAKE.|Y
01|56932|18|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|56932|18|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|56932|18|3|THIS COST DOES NOT INCLUDE ANY PARAMETERS THAT FANUC|Y
01|56932|18|4|MAY NEED TO INSTALL. THIS CANNOT BE DETERMINED TILL|Y
01|56932|18|5|WE RECEIVE MACHINE DATA SHEETS ARE RECEIVED|Y
01|56932|18|6|THERE IS A POSSIBILITY THAT OUR TECH WILL BE ABLE TO|Y
01|56932|18|7|TURN ON.|Y
01|56941|1|1|Reference RGA# TOR-48494|Y
01|56941|1|2|BT35-C1.1/4-85|N
01|56949|1|1|Reference RGA# TAR-48544|Y
01|56949|1|2|5AX-2MT-105-120FA-M s/n: 8125|N
01|56961|6|1|For actuating the 5C closer and tailstock|Y
01|56962|1|1|With Haas motor and cable set|Y
01|56962|1|2|Need to know if Sigma 1 or Sigma 5 motors/cables are|Y
01|56962|1|3|required|Y
01|56965|1|1|Reference RGA# TOR-48613|Y
01|56965|1|2|Inspection fee of $50.00 assessed for the cleanup of|Y
01|56965|1|3|customer's FP-2. Metal to metal connection was|Y
01|56965|1|4|obstructed causing light to not function. This has|Y
01|56965|1|5|been corrected.|Y
01|56966|2|1|Installation for 5AX Direct Drive Table on Mori FANUC|Y
01|56966|2|2|machine with travel and labor included.|Y
01|56972|1|1|Pricing for 1PC|Y
01|56972|2|1|Pricing for 1-3PCS|Y
01|56972|3|1|Pricing for 5-7PCS|Y
01|56985|1|1|Discount reflect a purchase order of 1 to 5 holders.|Y
01|56985|2|1|Discount reflects a purchase order of 6 to 10 holders.|Y
01|56985|3|1|Discount reflect a purchase order of 1 to 5 holders.|Y
01|56985|4|1|Discount reflect a purchase order of 6 to 10 holders.|Y
01|56992|1|1|Quoted at a net price|Y
01|56992|2|1|Quoted for consideration|Y
01|57020|1|1|CAT50-HC20-4.00|Y
01|57020|1|2|CAT50 Hydraulic Holder 20mm X 4.00 Gage Length|Y
01|57020|3|1|CAT50-HC20-3.5|Y
01|57020|3|2|CAT50 Hydraulic Holder 20mm X 4.00 Gage Length|Y
01|57027|2|1|THIS TABLE HAS HYD. BRAKE CLAMPING/ WILL NEED HYD UNIT|Y
01|57027|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|57027|11|1|THIS TABLE HAS AIR BRAKE.|Y
01|57027|18|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|57027|18|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|57027|18|3|THIS COST DOES NOT INCLUDE ANY PARAMETERS THAT FANUC|Y
01|57027|18|4|MAY NEED TO INSTALL. THIS CANNOT BE DETERMINED TILL|Y
01|57027|18|5|WE RECEIVE MACHINE DATA SHEETS ARE RECEIVED|Y
01|57027|18|6|THERE IS A POSSIBILITY THAT OUR TECH WILL BE ABLE TO|Y
01|57027|18|7|TURN ON.|Y
01|57028|4|1|CONFIRMATION OF CABLE NEEDED|Y
01|57028|6|1|CONFIRMATION OF PROPER CABLE NEEDED|Y
01|57028|14|1|INSTALLATION (MACHINE AND CONTROL TO BE DETERMINED|Y
01|57028|14|2|SHOULD NOT AFFECT QUOTE|Y
01|57028|14|3|INSTALLATION INCLUDES HARDWARE INTERNAL CABLES. FIBER|Y
01|57028|14|4|OPTIC CABLEAMPLIFIER  TRAVEL & LABOR|Y
01|57028|14|5|MACHINE DATA SHEETS REQUIRED FOR INSTALL|Y
01|57029|5|1|HYDRAULIC UNIT FOR BRAKE|Y
01|57031|3|1|Installation includes: Drive unit cable installation|Y
01|57031|3|2|parameter changes mounting of table service time|Y
01|57031|3|3|& service travel.|Y
01|57031|5|1|105MM Support table with pneumatic brake|Y
01|57033|2|1|ETA approx 7 business days|Y
01|57033|3|1|DIN Modify above holder NC4007-0016-3.50|Y
01|57033|6|1|ETA approx 7 business days|Y
01|57033|7|1|DIN Modify above holder C4007-0032-3.13|Y
01|57033|9|1|DIN modify above holder NC4007-0032-3.13|Y
01|57047|2|1|OPTION#1 - Lyndex-Nikken to design and manufacture the|Y
01|57047|2|2|positioning block for customer.  Customer must provide|Y
01|57047|2|3|machine and spindle information and/or spindle drawing.|Y
01|57047|2|4|$700.00 NET CHARGE.|Y
01|57055|5|1|Quoted at a net price|Y
01|57069|2|1|Special pricing for live tool core trade in program|Y
01|57076|2|1|EU gets 25% off of list price ($3012.60)|Y
01|57079|1|1|Quoted at a net price|Y
01|57088|1|1|20PCS Available|Y
01|57088|2|1|13PCS Available|Y
01|57088|3|1|4PCS Available|Y
01|57088|4|1|20PCS Available|Y
01|57088|5|1|8PCS Available|Y
01|57088|6|1|27PCS Available|Y
01|57088|8|1|1PCS Available|Y
01|57088|9|1|1PCS Available|Y
01|57088|10|1|1PC Available|Y
01|57088|11|1|20PCS Available|Y
01|57088|12|1|4PCS Available|Y
01|57088|13|1|2PCS Available|Y
01|57093|1|1|Package deal includes shrink fit unit cooling tower|Y
01|57093|1|2|10 standard GL BT30 shrink fit holders storage racks|Y
01|57093|1|3|2 BT30 taper pots induction rings & cooling brackets.|Y
01|57106|1|1|This item is non-cancellable and non-returnable once|Y
01|57106|1|2|a purchase order has been issued.|Y
01|57115|2|1|COMPLETE REPLACEMENT UNIT FOR ORIGINAL|Y
01|57115|2|2|KEPT ORIGINAL MORRIS COST|Y
01|57121|1|1|Quoted at a net charge|Y
01|57121|1|2|$70 added for DIN|Y
01|57123|2|1|M0306-0437-1.94  Morse Taper MT3 7/16 End Mill Holder|Y
01|57123|2|2|w 1.94 gage length.|Y
01|57123|3|1|M0306-0437-1.94 Morse Taper MT3 7/16 End Mill Holder|Y
01|57123|3|2|w 1.94 gage length|Y
01|57136|2|1|Test Quote|Y
01|57154|1|1|Price reflects knob with purchase of matchinf taper|Y
01|57154|1|2|holder.|Y
01|57155|1|1|Reference RGA# T-47700|Y
01|57155|1|2|CNC180FA s/n: 8830|N
01|57213|2|1|1 pull stud @ $5.00 net w/ purchase of matching holder|Y
01|57216|1|1|*As-Is  - Unit cannot be cancelled or returned|Y
01|57217|2|1|! pull stud @ $5.00 net w/ purchase of matching holder|Y
01|57221|3|1|Wrenches for above 2 tools at NC as a courtesy.|Y
01|57221|7|1|Wrench for above tool holder at NC as a courtesy.|Y
01|57222|1|1|NB5006-2000-4.00CP  Dual Contact BT50 Taper 2 SideLock|Y
01|57222|1|2|End Mill Holder 4 GL with Coolant Ports|Y
01|57222|1|3|1-2pc Pricing|Y
01|57222|2|1|NB5006-2000-4.00CP  Dual Contact BT50 Taper 2 SideLock|Y
01|57222|2|2|End Mill Holder 4 GL with Coolant Ports|Y
01|57222|2|3|3-5pc Pricing|Y
01|57222|3|1|NB5006-2000-4.00CP  Dual Contact BT50 Taper 2 SideLock|Y
01|57222|3|2|End Mill Holder 4 GL with Coolant Ports|Y
01|57222|3|3|6pc Pricing|Y
01|57222|5|1|NBT50-C2-105FS Dual Contact BT50 2 Milling Chuck 4.13|Y
01|57222|5|2|GL with Side Lock Screw and Jet Slot Face Cap|Y
01|57222|5|3|1-2pc Pricing|Y
01|57222|6|1|NBT50-C2-105FS Dual Contact BT50 2 Milling Chuck 4.13|Y
01|57222|6|2|GL with Side Lock Screw and Jet Slot Face Cap|Y
01|57222|6|3|3-5pc Pricing|Y
01|57222|7|1|NBT50-C2-105FS Dual Contact BT50 2 Milling Chuck 4.13|Y
01|57222|7|2|GL with Side Lock Screw and Jet Slot Face Cap|Y
01|57222|7|3|6pc Pricing|Y
01|57228|1|1|ETA 1pc approx 2 weeks remaining bal approx 12 wks|Y
01|57235|1|1|Delivery= 1-2 wks|Y
01|57248|2|1|SPECIAL PRICING FOR CONSIGNMENT TABLE ALREADY AT|Y
01|57248|2|2|KNIGHTS PLUS 1 ADDITIONAL NEEDED|Y
01|57275|1|1|HSK125A-TESTBAR-50-300 HSK125A Taper 50mm diam 300mm GL|Y
01|57293|1|1|Installation of 5AX-201YA on Haas Vertical Mill Mach.|Y
01|57293|1|2|Machine must be 4th/5th Axis ready with Haas|Y
01|57293|1|3|Options and servo drives installed prior to Lyndex|Y
01|57293|1|4|tech arrival.  Scheduling of installation TBD|Y
01|57294|3|1|Quoted at a net price|Y
01|57294|3|2|Pricing reflections standard holder with a DIN|Y
01|57294|3|3|Modification|Y
01|57302|1|1|Package deal includes shrink fit unit cooling tower|Y
01|57302|1|2|10 standard GL BT30 shrink fit holders storage racks|Y
01|57302|1|3|2 BT30 taper pots induction rings & cooling brackets.|Y
01|57318|1|1|Discount reflects non returnable tooling.|Y
01|57318|3|1|Discount reflects non returnable tooling.|Y
01|57322|3|1|Please check attached drawing to confirm this is the|Y
01|57322|3|2|correct stud for his Fadal machine.|Y
01|57323|2|1|Custom Positioning Block per specs provided by End User|Y
01|57326|1|1|NBT30-SKT10C-90P Taper Plus 30 SK10 HiSpeed Rigid Chuck|Y
01|57326|2|1|NBT30-SKT16C-90P Taper Plus 30 SK16 HiSpeed Rigid Chuck|Y
01|57326|3|1|NBT30-SKT6C-90P Taper Plus 30 SK6 HiSpeed Rigid Chuck|Y
01|57343|2|1|1 Knob @ $5.00 net with the purchase of a matching tool|Y
01|57352|1|1|(Okuma Part # :507-4927-9)|Y
01|57359|1|1|Special pricing under the contingency that this is non-|Y
01|57359|1|2|returnable.|Y
01|57383|1|1|TABLE INCLUDES SERVO MOTOR CABLES & PARAMETERS|Y
01|57383|1|2|SERVO MOTOR SIGMA 5 UNLESS OTHERWISE NOTED|Y
01|57385|1|1|Tooling Certificate Number: 25000-821-080416|Y
01|57396|1|1|Table with Fanuc motor.|Y
01|57396|3|1|Installation Includes: Drive amps bulkhead cable sets|Y
01|57396|3|2|external cable sets communication cables parameter|Y
01|57396|3|3|changes travel and labor for installation of one|Y
01|57396|3|4|table on one machine. Both installs to be done in one|Y
01|57396|3|5|trip.|Y
01|57414|1|1|Oriented to be used with a right hand tool|Y
01|57414|2|1|Oriented to be used with a left hand tool|Y
01|57415|3|1|Pricing Pending.  Will advise shortly.|Y
01|57420|1|1|HFO TAMPA TO SUPPLY MOTOR AND CABLES|Y
01|57420|1|3|5 TABLE AVAILABLE IN 3-4 WEEKS|Y
01|57420|1|4|TAILSTOCK DELIVERY 4 WEEKS POSSIBLY|Y
01|57424|9|1|DELIVERY 4-5 WEEKS|Y
01|57443|1|1|Reference RGA# LVR-48540|Y
01|57443|1|2|H63ARAM-ER25-187OTC s/n: 45829 02|N
01|57443|3|1|Spindle is damaged due to crash and must be replaced.|Y
01|57443|3|2|Bearings seals and o-rings are worn/damaged and must|Y
01|57443|3|3|be replaced. Labor is included.|Y
01|57444|1|1|Pricing for 1-2PCS|Y
01|57444|1|2|4PC|Y
01|57444|2|1|Pricing for 3-4 PCS|Y
01|57444|2|2|4PCS in STOCK|Y
01|57444|4|1|Pricing for 1-2PCS|Y
01|57444|4|2|8PCS in STOCK|Y
01|57444|5|1|Pricing for 3-8PCS|Y
01|57444|5|2|8PCS in STOCK|Y
01|57445|1|1|NBT30-SKT10C-90P-J TaperPlus30 SK10 HiSpeed Rigid Chuck|Y
01|57445|1|2|with Coolant Nut installed at factory|Y
01|57445|2|1|NBT30-SKT16C-90P-J TaperPlus30 SK16 HiSpeed Rigid Chuck|Y
01|57445|2|2|with Coolant Nut installed at factory|Y
01|57445|3|1|NBT30-SKT6C-90P-J TaperPlus30 SK6 HiSpeed Rigid Chuck|Y
01|57445|3|2|with Coolant Nut installed at factory|Y
01|57445|26|1|SKJ6-2.5C  SK6 Coolant Thru Disk 2.5mm ID|Y
01|57462|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|57462|2|2|holders. (Thank you for Rotary Table Purchase)|Y
01|57462|3|1|$9K List Price Tooling Certificate good for list price|Y
01|57462|3|2|tool holders.|Y
01|57472|1|1|Standard Coolant Through version|Y
01|57472|3|1|To be modified to part # C5036-0500-8.00CP w/Coolant|Y
01|57472|3|2|Ports.|Y
01|57472|4|1|Modification of above Holder to Coolant Port|Y
01|57500|1|4|INCLUDED INSIDE WIRE HARNESS AND SERVO MOTOR|Y
01|57500|1|5|WILL NEED INFOR FROM MAZAK SUUCH AS SCHEMATICS|Y
01|57500|1|6|EXTERNAL CABLES USUALLY PROVIDED WITH INTERFACE|Y
01|57500|5|1|FOR EACH 4TH AXIS A $ 1000 TOOL CERT PROVIDED|Y
01|57503|3|1|SAMPLE OF CERTIFICATE OFFERED TO AZIMUTH|Y
01|57503|3|2|USUALLY THEY ARE GIVE A 30-35% DISCOUNT|Y
01|57503|3|3|IF NEEDED PLEASE CALL TO DISCUSS|Y
01|57509|3|1|Install Includes: Drive amp bulkhead cables external|Y
01|57509|3|2|cables communication cable parameter changes travel|Y
01|57509|3|3|and labor for installing one 5AX table on one new YCM.|Y
01|57509|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|57509|4|2|holders.|Y
01|57510|1|1|Table with HAAS Motors and Cables.|Y
01|57530|4|1|Tailstock with MT-#3 socket without live center.|Y
01|57530|6|1|Atlas Dead length self contained 5C collet closer.|Y
01|57530|6|2|Hand lever included.|Y
01|57531|2|1|Installation includes: Drive unit short bar fiber|Y
01|57531|2|2|optic cable communications cable bulk head cable set|Y
01|57531|2|3|external cable set parameter changes service time &|Y
01|57531|2|4|travel|Y
01|57577|2|1|Includes cables drive fiber optic cable interface|Y
01|57577|2|2|cable|Y
01|57579|1|1|Quoted without DIN modification|Y
01|57579|4|1|This line is referenced at your NET cost|Y
01|57588|1|1|Back Ch Tool|Y
01|57588|3|1|Cross Holes|Y
01|57588|5|1|Flange Holes|Y
01|57588|6|1|Lock Pin Hole Drill|Y
01|57589|2|1|Coolant cap quoted for consideration.|Y
01|57594|4|1|This line is referenced at your NET cost|Y
01|57604|1|1|1-CNCZ180LSABR2 table with installation kit for one|Y
01|57604|1|2|table only.|Y
01|57605|3|1|M512C Head Clamp Bolt|Y
01|57610|1|1|Mimatic Part Number: 124897|Y
01|57610|1|2|ETA aprox 7 weeks|Y
01|57611|1|1|100MM twin spindle table without motor.|Y
01|57621|1|1|Table with motor set up for Hurco VMC.|Y
01|57621|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|57621|2|2|external cable set communications cable parameter|Y
01|57621|2|3|changes travel and labor for installing one rotary|Y
01|57621|2|4|table on one Hurco VMC.|Y
01|57621|6|1|***OPTIONAL***|Y
01|57621|6|2|Outboard support table with bearing and brake. Also|Y
01|57621|6|3|matches CNC180 C/L height.|Y
01|57621|7|1|***OPTIONAL***|Y
01|57621|7|2|Manual Tailstock - Matches CNC180 C/L height.|Y
01|57624|1|1|Pricing for 1-2PCS|Y
01|57624|2|1|Pricing for 3-5PCS|Y
01|57624|2|2|5PCS Available|Y
01|57624|4|1|Pricing for 1-3PCS|Y
01|57624|4|2|4 PCS Available|Y
01|57624|5|1|Pricing for 4PCS|Y
01|57624|5|2|4PCS Available|Y
01|57628|1|1|4pcs stock remaining bal ETA pending factory.|Y
01|57629|2|1|3.00 Gage Length|Y
01|57629|2|2|*Qty Break Pricing - 10pc Minimum Required|Y
01|57629|3|1|*Qty Break Pricing - 11-20pc Required|Y
01|57629|15|1|*Qty Break Pricing - 10pc Minimum Required|Y
01|57629|16|1|*Qty Break Pricing - 10pc Minimum Required|Y
01|57636|1|1|Reference RGA# TOR-48639|Y
01|57636|1|2|HSK63A-C1.1/4-110G|N
01|57641|1|1|Reference RGA# TAR-48593|Y
01|57641|1|2|CNCZ180LYA-BR s/n: 12338|N
01|57642|1|1|Reference RGA# TAR-48573|Y
01|57642|1|2|AA21N-CTRL-750|N
01|57642|4|1|Power supply for AA21 Control|Y
01|57643|1|1|Pre-Balanced and Balanceable|Y
01|57643|4|1|Prebalanced and balanceable|Y
01|57647|1|1|C4001-0750-6.00  Shell Mill Holder 3/4 x 6.00 Gage|Y
01|57652|2|1|Wrench for C4017-0011-4.00|Y
01|57678|1|1|Service Call completed by Armando Mena and Gustavo|Y
01|57678|1|2|Vazquez 8/16/16 to 8/17/16.|Y
01|57678|2|1|Hotel: $471.95 x 2 Techs = $943.90|Y
01|57678|2|2|Gas Per Mileage: 862 RT x .565/mi = $487.03|Y
01|57678|2|3|Meal Per day(x2 Techs): ($50. x 4days) x 2 Tech = $400.|Y
01|57678|2|4|Transit time (x2 Techs): (21.50hrs x $100/hr) x 2 Techs|Y
01|57678|2|5|= $4300.00|Y
01|57678|2|6|Note: All prices include travel days.|Y
01|57678|3|1|12 hours of labor per Technician x 2 Technicians|Y
01|57689|2|1|Installation Kit Includes: Drive amp bulkhead cable|Y
01|57689|2|2|set external cable set and other needed communication|Y
01|57689|2|3|cables.|Y
01|57699|2|1|*Wrench for CAT40-C3/4-85U|Y
01|57703|2|1|Quoted for consideration.|Y
01|57703|2|2|DMG Puchased one on PO#811647|Y
01|57704|1|1|Reference RGA# TAR-48600|Y
01|57704|1|2|NSVX400 s/n: 2080|N
01|57704|33|1|TCD-33025: Rotary Union|Y
01|57726|1|1|HSK100A-SLS12-80-IDU  12mm End Mill Holder 80mm GL with|Y
01|57726|1|2|ID Chip Holes cut in at factory|Y
01|57772|1|1|MSC Part#01661685|Y
01|57772|2|1|MSC Part#01661719|Y
01|57772|3|1|MSC Part#52463742|Y
01|57772|4|1|MSC Part#54490503|Y
01|57772|5|1|MSC Part#06439228|Y
01|57772|6|1|MSC Part#44657328|Y
01|57772|7|1|MSC Part#84917327|Y
01|57772|8|1|MSC Part#84917483|Y
01|57772|9|1|MSC Part#03958295|Y
01|57776|21|1|Start2 Pendant|Y
01|57777|5|1|INCLUDES 2 TABLES ELECTRONICS DIVIDER|Y
01|57777|5|2|JUNCTION BOX CABLES|Y
01|57777|5|3|DELIVERY WILL BE BEGINNING OF SEPTEMBER|Y
01|57777|5|4|ON BOAT ALREADY|Y
01|57846|1|1|Reference RGA# LVR-48598|Y
01|57846|1|2|OKL3-ER32Z s/n: A0070|N
01|57846|3|1|Collet nut bearings seals and o-rings must be|Y
01|57846|3|2|replaced. Labor is included.|Y
01|57865|3|1|one unit already at Knights (on Okuma M560V)|Y
01|57865|3|2|cable set at no charge with unit|Y
01|57883|3|1|Wrench quoted below is for this holder and I will|Y
01|57883|3|2|throw it in for free if they purchase the B holders.|Y
01|57885|1|1|This is our Standard 2.5 ID diam x 13 GL|Y
01|57885|1|2|I highly recommend they purchase these off the shelf|Y
01|57885|1|3|and cut down themselves as they are readily available.|Y
01|57885|1|4|This would be the most economical method for them.|Y
01|57885|9|1|C4008-BLANK-SP CAT40 Blank Bar 4 ID diam x 6 GL|Y
01|57885|11|1|HSK63A-BLANK-SP HSK63A Blank  2.5 ID diam x 100mm GL|Y
01|57885|13|1|HSK63A-BLANK-SP HSK63A Blank  2.5 ID diam x 150mm GL|Y
01|57885|15|1|HSK63A-BLANK-SP HSK63A Blank  2.5 ID diam x 200mm GL|Y
01|57885|17|1|HSK63A-BLANK-SP HSK63A Blank  80mm ID diam x 100mm GL|Y
01|57885|19|1|HSK63A-BLANK-SP HSK63A Blank  80mm ID diam x 250mm GL|Y
01|57888|1|1|Reference RGA# TAR-48600|Y
01|57888|1|2|TAT-400 s/n: 1394|N
01|57908|1|1|Non-coolant|Y
01|57908|1|2|*Customer has a few pcs.|Y
01|57908|2|1|*DIN - Coolant Through The Flange|Y
01|57908|2|2|*If not using coolant then this will not be a factor.|Y
01|57933|1|1|IT40-C32-105 Milling Chuck 32mm X 105 Gage|Y
01|57933|1|2|Drill must be H6 tolerance for direct chucking.|Y
01|57933|1|3|Quoted at net price.|Y
01|57933|3|1|IT40-SK25C-120  SK25 Collet Chuck|Y
01|57933|3|2|Quoted at net price.|Y
01|57942|1|1|4 Gage length|Y
01|57949|2|1|SPECIAL EXTERNAL CABLE SETS FOR PARKER PROJECT|Y
01|57949|2|2|TWO COMPLETE SETS INCLUDING POWER AND FEEDBACK CABLES|Y
01|57949|2|3|THESE HAVE ALREADY BEEN SHIPPED|Y
01|57959|8|1|ETA approximately 10/4|Y
01|57971|4|1|3.54 Gage Length|Y
01|57971|5|1|4.72 Gage Length|Y
01|57978|1|1|Reference RGA# TAR-48621|Y
01|57978|1|2|CNC202LSA3 s/n: 7093|N
01|57989|1|1|Reference RGA# TAR-48622|Y
01|57989|1|2|CNC202LSA3 s/n: 7099|Y
01|57990|1|1|Includes SF machine 10 standard GL CAT40 SF holders|Y
01|57990|1|2|2 CAT40 shrink fit pots heat induction rings 2 racks|Y
01|57990|1|3|cooling tower and set of gloves.|Y
01|58019|1|1|Alps Part Number STA00-18000|Y
01|58020|7|1|HSK63A-HC0625-90 Hydraulic Holder|Y
01|58023|5|1|INSTALLATION INCLUDES DRIVES CABLES FIBER OPTICS|Y
01|58023|5|2|CONNECTORS TRAVLE & LABOR|Y
01|58023|5|3|PLEASE NOTE IF LYNDEX NIKKEN DOES INSTALLATION|Y
01|58023|5|4|MACHINE DATA SHEET ARE REQUIRED TO CONFIRM MACHINE|Y
01|58023|5|5|INFO|Y
01|58023|7|1|TOOL CERTIFICATE VALUEDAT $ 2000 FACE VALUE|Y
01|58024|1|1|NIKKEN TABLE EQUIPPED WITH AIR/HYD BOOSTER|Y
01|58024|1|2|INSTALLATION QUOTED THROUGH CNC ENGINEERING|Y
01|58037|5|1|Unit includes accessories and 10 tool standard tool|Y
01|58037|5|2|holders from list.|Y
01|58037|6|1|Unit includes accessories and 10 tool standard tool|Y
01|58037|6|2|holders from list.|Y
01|58041|4|1|Installation includes: Drive unit short bar|Y
01|58041|4|2|communications cable fiber optic cable bulkhead|Y
01|58041|4|3|cable set external cable set parameter changes.|Y
01|58041|4|4|service time and travel.|Y
01|58048|5|1|*Rigid Tap Only|Y
01|58050|1|1|Crossed over from BT40-DW3-105 to current stock.|Y
01|58056|9|1|Not offered in coolant through|Y
01|58056|10|1|Not offered in coolant through|Y
01|58068|1|1|8 Rotary Table Option|Y
01|58068|2|1|8 Scroll Chuck Option|Y
01|58068|4|1|10 Rotary Table Option|Y
01|58068|5|1|10 Scroll Chuck Option|Y
01|58068|7|1|Installation Includes: Drive amp bulkhead cable set|Y
01|58068|7|2|external cable set communications cable parameter|Y
01|58068|7|3|changes travel and labor for installing one rotary|Y
01|58068|7|4|table on one Hwacheon Vesta 1000 OiMF control VMC.|Y
01|58076|1|1|Mimatic 123780  ER25 Straight Ext Coolant  DIN5482|Y
01|58076|3|1|Mimatic 124491  ER25 90-Deg EXT Coolant  DIN5482|Y
01|58076|7|1|Mimatic 103554  ER25 90-Deg R/H Ext Coolant DIN5480|Y
01|58076|9|1|Mimatic 103545  ER25 90-Deg L/H EXT Coolant DIN5480|Y
01|58079|1|1|2-5AX100SABR2 tables with R450X1 interface kits.|Y
01|58079|2|1|1-5AX100SABR2 with R450X1 instalaltion kit one table.|Y
01|58082|1|1|Reference RGA# TAR-48623|Y
01|58082|1|2|CNC202LSA3 s/n: 7964|N
01|58109|12|1|Quoted for consideration|Y
01|58109|18|1|Quoted in consideration to C4007-0025B|Y
01|58143|1|1|Standard price|Y
01|58143|2|1|Trade-in promo price|Y
01|58161|3|1|This line is reference at your NET cost|Y
01|58162|2|2|Price includes Drawbar and Adapter listed below.|Y
01|58162|8|1|This option comes with the adapter to fit V100 spindle.|Y
01|58162|8|2|Price includes the Drawbar listed below.|Y
01|58169|4|1|Quoted in consideration to N5007-0025-2.00|Y
01|58170|1|1|# TCE-A4041/0 Rotary Power & Signal Cable|Y
01|58170|1|2|Internal for 5AX-150 Alpha 2/5000 for Robodrill|Y
01|58174|1|1|Reference RGA# TAR-48589|Y
01|58174|1|2|CNC100-3W-120FA s/n: 0871|N
01|58182|1|1|Tooling Certificate Number: 8115-830-082616|Y
01|58182|2|1|8pcs stock 1pc ETA Pending Factory.|Y
01|58182|2|2|Alternative stock offered on line item 2.|Y
01|58189|1|1|Standard Price|Y
01|58189|2|1|Trade-In Promo Price|Y
01|58189|3|1|Standard Price|Y
01|58189|4|1|Trade-In Promo Price|Y
01|58203|1|1|UNV 423-B|Y
01|58205|1|1|UNV 423-B|Y
01|58208|1|1|UNV 423-B|Y
01|58216|2|2|Price includes Drawbar and Adapter listed below.|Y
01|58216|8|1|This option comes with the adapter to fit V100 spindle.|Y
01|58216|8|2|Price includes the Drawbar listed below.|Y
01|58218|1|1|Estimate for service call to be completed by technician|Y
01|58218|1|2|Pedro Suarez.|Y
01|58218|1|3|Table to be serviced is 5AX-N400 s/n: 2578|Y
01|58218|2|1|Transit Time: 10hrs (round trip) x $60.00/hr = $600.00|Y
01|58218|2|2|Meal per day: 2days x $35.00/day = $70.00|Y
01|58218|2|3|Hotel: Approximately $80.00 for 1 night.|Y
01|58218|3|1|Minimum labor charge its 2 hours.|Y
01|58218|3|2|Estimated time for this service call is 6-8 hours.|Y
01|58224|7|1|below chuck adapter plate and tailstock included N/C|Y
01|58224|14|1|INSTALLATION  FOR 4TH AXIS. INCLUDES SERVO MOTOR|Y
01|58224|14|2|AMPLIFIER WIRE HARNESS FIBER OPTIC CABLE|Y
01|58224|14|3|CONNECTORS TRAVEL AND LABOR|Y
01|58231|23|1|ETA Pendin Factory|Y
01|58231|80|1|ETA Pending Factory|Y
01|58231|81|1|ETA Pending Factory|Y
01|58231|99|1|ETA Pending Factory|Y
01|58231|101|1|7pcs stock 1pc. ETA Pending Factory|Y
01|58232|1|1|Will Not Work : Brother TC22B32BNFTM140X1R450X1|Y
01|58232|1|2|R650X1S300X1X500X1X700X1S1000X1|Y
01|58242|5|1|Fadal 4020HT positioning block. Need spindle face|Y
01|58242|5|2|drawing to move forward with design and manufacture.|Y
01|58252|2|1|Coolant ports installed onto holder|Y
01|58252|2|2|Quoted in consideration to H63A-SK10-120|Y
01|58252|6|1|Coolant ports installed on holder|Y
01|58252|6|2|ID chip hole installed on holder|Y
01|58264|1|1|350MM 4th and 5th axis table with Mitsubishi motors|Y
01|58264|3|1|Installation includes: Dual axis drive unit short bar|Y
01|58264|3|2|communications cables bulkhead cables external cables|Y
01|58264|3|3|parameter changes service time and travel.|Y
01|58275|2|1|We do not offer coolant version. Sorry!!!|Y
01|58281|2|1|*Coolant Through the Flange.|Y
01|58281|2|2|*Can also be run-dry|Y
01|58312|2|1|CONVERT CURRENT CNC-260FA-M TO CNC-260OSP3-M|Y
01|58312|2|2|INCLUDES OSP3 MOTOR GEAR CONNECTORS WIRE HARNESS|Y
01|58312|2|3|MOTOR COVER LABOR|Y
01|58312|2|4|THIS QUOTE IS PER TABLE|Y
01|58328|2|1|FREE $1K Tooling Certificate good for list price tool|Y
01|58328|2|2|holders.|Y
01|58328|3|1|Tooling Certificate good for list price tool holders.|Y
01|58328|3|2|$2K Face Value.|Y
01|58329|2|1|TABLE USES HYDRAULIC SOURCE FOR BRAKW SYSTEM|Y
01|58329|2|2|TABLE SUPPLIED WITH MITSUBISHI SERVO FOR BOTH AXIS|Y
01|58329|2|3|4 + 1 CAPABILITY|Y
01|58329|2|4|THIS REFLECTS BOTH THE 5AX-350 AND 5AX-250|Y
01|58330|3|1|Lyndex-Nikken to make block upon receipt of machine|Y
01|58330|3|2|spindle information.|Y
01|58333|1|1|NOTE THIS IS FOR YASNAC MOTOR. HFO TAMPA TO SUPPLY|Y
01|58333|1|2|MOTOR AND CABLE TO LYNDEX NIKKEN|Y
01|58365|1|1|Special Howa Chuck for Multus B750 A2-15 Main/Sub|Y
01|58365|1|2|18-24 Large through bore Chuck 3 Jaw Wedge|Y
01|58367|1|1|Discount reflects any quantity on future orders.|Y
01|58378|23|1|ETA pending per factory|Y
01|58378|80|1|ETA Pending Factory|Y
01|58378|81|1|ETA Pending Factory|Y
01|58378|99|1|ETA Pending Factory|Y
01|58378|101|1|7pcs stock 1pc. ETA pending Factory|Y
01|58382|23|1|ETA Pending Factory|Y
01|58382|80|1|ETA Pending Factory|Y
01|58382|81|1|ETA Pending Factory|Y
01|58382|99|1|ETA Pending Factory|Y
01|58382|101|1|7pcs stock 1pc. ETA Pending Factory|Y
01|58382|163|1|1pc stock remaining bal pending factory.|Y
01|58382|177|1|1pc stock remaining bal pending factory.|Y
01|58382|241|1|1pc stock remaining bal pending factory.|Y
01|58395|2|1|Stainless Steel|Y
01|58397|4|1|Unit includes accessories and 10 standard tool holders|Y
01|58397|4|2|from list|Y
01|58397|5|1|Unit includes accessories and 10 standard tool holders|Y
01|58397|5|2|from list|Y
01|58398|2|1|Stainless Steel|Y
01|58400|1|1|Reference RGA# R-48278|Y
01|58400|1|2|MZL60-ER32(X)-SP s/n: 38815 03|N
01|58400|3|1|Bearings seals and o-rings are worn and must be|Y
01|58400|3|2|replaced. Spindles must be resurfaced. Thread rings|Y
01|58400|3|3|and stress relief bolts must be replaced.|Y
01|58400|3|4|Labor is included.|Y
01|58402|1|1|Wrenches Included|Y
01|58432|1|1|MBT40-C20-70|Y
01|58432|2|1|MBT40-C20-90|Y
01|58439|1|1|This is a non standard stock item once a purchase|Y
01|58439|1|2|order is placed it cannot be cancelled or returned.|Y
01|58467|1|1|CAT50 End Mill Holder 2ID 3OD 5.625 GL|Y
01|58467|1|2|ETA approx 8-10 weeks|Y
01|58469|5|1|machine must have ddrt interface|Y
01|58469|5|2|Possible assistance with ladder may be need from DMG|Y
01|58469|5|3|MORI DURING INSTALLATION AND CONFIRMATION OF DATA SHEET|Y
01|58469|5|4|CONFIRMATION OF FIT ON MACHINE NEEDED|Y
01|58480|2|1|*120mm gl    *special pricing*|Y
01|58480|4|1|*90mm gage length|Y
01|58480|6|1|*wrench will work on either of these holders|Y
01|58495|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|58495|2|2|external cable set communication cable parameter|Y
01|58495|2|3|changes travel and labor for installing one 5AX-130|Y
01|58495|2|4|on one Eco V1100 VMC.|Y
01|58508|1|1|Reference RGA# CUR-48678|Y
01|58508|1|2|C40FHM-ER20-198-SP s/n: 46835 01|N
01|58508|3|1|Bearings seals and o-rings are worn and must be|Y
01|58508|3|2|replaced. Spindles must be resurfaced.|Y
01|58508|3|3|Labor is included.|Y
01|58516|1|1|Coil Spring for 6mm Air Line|Y
01|58516|1|2|1 pc = 1.5M Length|Y
01|58518|1|1|2-180MM High Speed Nikken Tables with Brother R650X1|Y
01|58518|1|2|installation kit.|Y
01|58521|1|1|Reference RGA# TOR-48687|Y
01|58521|1|2|NC5-63S-F50-220-14|N
01|58525|1|1|Reference RGA# TAR-48721|Y
01|58525|1|2|CNCZ180L s/n: 12337|Y
01|58525|14|1|Expedite fee discounted 50% as a courtesy per Steve|Y
01|58525|14|2|Lenihan.|Y
01|58525|14|3|This is to have repair completed 2 business days|Y
01|58525|14|4|from the receipt of approval to proceed.|Y
01|58525|14|5|Normal delivery is 1-2 weeks.|Y
01|58528|1|1|OPTION #1|Y
01|58528|3|1|OPTION #2|Y
01|58528|5|1|OPTION #3|Y
01|58528|8|1|Installation Includes: Drive amp bulkhead cable set|Y
01|58528|8|2|external cable set communication cable parameter|Y
01|58528|8|3|changes travel and labor for installing 2 rotary|Y
01|58528|8|4|tables on one new Accutron vertical pallet machine.|Y
01|58528|8|5|1 table per pallet 2 pallets per machine.|Y
01|58536|3|1|Tailstock OPTION#1|Y
01|58536|4|1|Tailstock OPTION#2|Y
01|58536|6|1|Support table with bearing and brake.|Y
01|58536|8|1|Installation Includes: Drive amp bulkhead cable set|Y
01|58536|8|2|external cable set communication cable parameter|Y
01|58536|8|3|changes travel and labor for installing one rotary|Y
01|58536|8|4|table on one Matsuura VX1500 VMC.|Y
01|58536|9|1|Free $1K Tooling Certificate good for list price tool|Y
01|58536|9|2|holders.|Y
01|58541|1|1|Installation Kit for a CNC302 on a Doosan DNM500|Y
01|58541|1|2|Amplifier Servo Drive NOT included as customer has.|Y
01|58550|3|1|Systen 3R Macro chuck 3R-SP26771-RS with adapter.|Y
01|58556|2|1|CNC-260OSP3-M (TABLE & MOTOR ONLY) SPECIAL PRICING|Y
01|58556|2|2|PACKAGE PRICE INCLUDES CNC-260OSP3-M EXTERNAL CABLES|Y
01|58556|2|3|CHUCK ADAPTER PLATE TAILSTOCK|Y
01|58573|1|1|Reference RGA# TAR-48668|Y
01|58573|1|2|5AX-4MT-NC5/85S-152.4FA s/n: 1188|N
01|58573|22|1|Inspection fee $800.00 net|Y
01|58573|22|2|Storage fee $100.00/month x 16months = $1600.00|Y
01|58588|1|1|Includes motor and cable set.|Y
01|58606|2|1|This line at no charge|Y
01|58606|3|1|This line at no charge|Y
01|58638|23|1|ETA Pending Factory|Y
01|58638|80|1|ETA Pending Factory|Y
01|58638|81|1|ETA Pending Factory|Y
01|58638|99|1|ETA Pending Factory|Y
01|58638|101|1|7pcs stock 1pc. ETA Pending Factory|Y
01|58638|163|1|1pc stock remaining bal pending factory.|Y
01|58638|177|1|1pc stock remaining bal pending factory.|Y
01|58638|241|1|1pc stock remaining bal pending factory.|Y
01|58640|23|1|ETA Pending Factory|Y
01|58640|85|1|ETA Pending Factory|Y
01|58640|86|1|ETA Pending Factory|Y
01|58640|104|1|ETA Pending Factory|Y
01|58640|106|1|7pcs stock 1pc. ETA Pending Factory|Y
01|58640|171|1|1pc stock remaining bal pending factory.|Y
01|58640|186|1|1pc stock remaining bal pending factory.|Y
01|58640|252|1|1pc stock remaining bal pending factory.|Y
01|58644|7|1|INSTALLATION INCLUDES LABOR TRAVEL DRIVES(DUAL)|Y
01|58644|7|2|EXTERNAL CABLES CONNECTORS FIBERR OPTICS|Y
01|58665|1|1|HSK63(80) 3/4 Hydraulic Holder w/3.375 gage|Y
01|58665|2|1|HSK63(80) 3/4 Hydraulic Holder w/3.375 gage|Y
01|58665|3|1|HSK63(80) 3/4 Hydraulic Holder w/3.375 gage|Y
01|58665|5|1|HSK63(80) 1.0 Hydraulic Holder w/3.375 gage|Y
01|58665|6|1|HSK63(80) 1.0 Hydraulic Holder w/3.375 gage|Y
01|58665|7|1|HSK63(80) 1.0 Hydraulic Holder w/3.375 gage|Y
01|58666|1|1|Package Includes:|Y
01|58666|1|2|Shrink Fit Unit + 10 Shrink Fit Holders|Y
01|58666|1|3|7 Coolant Port 3 Standard Holders|Y
01|58669|3|1|TABLE TO BE USED IN VERTICAL POSITION|Y
01|58669|4|1|AIR/HYD BOOSTER FOR CNC-260|Y
01|58669|6|1|SUPPRT TAILSTOCK WITH BRAKE|Y
01|58672|3|1|Lyndex-Nikken will make block upon receipt of spindle|Y
01|58672|3|2|drawing.|Y
01|58672|3|3|Otherwise customer may make their own block.|Y
01|58674|23|1|ER40 Coolant Collets 5/163/87/161/29/16 & 5/8|Y
01|58682|2|1|Left Hand Unit with Fanuc Motor less cables|Y
01|58697|1|1|Reference RGA# LVR-48743|Y
01|58697|1|2|T32276 (MNZ20-ER25Z-MS) s/n: A0009|N
01|58697|3|1|Drive shaft is damaged and must be replaced.|Y
01|58697|3|2|Collet nut bearings seals and o-rings must be|Y
01|58697|3|3|replaced. Labor is included.|Y
01|58721|1|1|Table with HAAS motors and cables - AIR BRAKE|Y
01|58728|1|1|This item is a Special. I have 1pc from an overrun in|Y
01|58728|1|2|stock but if more are needed they will have to be made|Y
01|58728|1|3|with a 12 week ETA.|Y
01|58735|8|1|Max shank diameter offered to 5/16 or 8mm|Y
01|58735|12|1|Block to be made upon receipt of spindle drawing|Y
01|58736|4|1|Will purchase 7x Robodrill in 2017(1stQ)|N
01|58736|4|2|for new facility in WI.|N
01|58736|5|1|Using WTO now. Seeking better Quaity RPLC ASAP.|N
01|58768|17|1|ID Chips to be installed on holders at Factory|Y
01|58768|18|1|Coolant Tubes to be installed on holders at Factory|Y
01|58797|6|1|1.5mm Serration Pitch|Y
01|58797|6|2|*1pc 2-3wks otherwise End/Nov|Y
01|58803|1|1|Refurbished unit 6 month warranty with motors|Y
01|58857|5|1|Quoted in regards to live tool buyback program|Y
01|58880|1|1|Quoted at a net price|Y
01|58884|1|1|SF-Package Includes 10 MISCELLANEOUS holders in either|Y
01|58884|1|2|CAT40 or CAT50 taper.|Y
01|58884|1|3|IMTS - PROMOTION -->  ADD 5 HOLDERS OR COOLING UNIT|Y
01|58884|2|1|2pc-taper pots included with machine|Y
01|58892|1|1|Budgetary repair of 5AX-2MT-225-304.8 S/N 1213|Y
01|58892|1|2|Price for repair is subject to change if table is sent|Y
01|58892|1|3|in for repair.|Y
01|58892|46|1|1 Week repair based on all parts available.|Y
01|58899|1|1|NB4016-0250-4.00  TaperPlus BT40 1/4 EMH 4 GL|Y
01|58899|2|1|NB4016-0375-4.00  TaperPlus BT40 3/8 EMH 4 GL|Y
01|58899|3|1|NB4016-0500-4.00  TaperPlus BT40 1/2 EMH 4 GL|Y
01|58899|5|1|1pc at factory ETA aprox 2 weeks/Bal aprox 12 weeks|Y
01|58899|12|1|NB4017-0011-4.00  TaperPlus BT40 ER11 Chuck 4 GL|Y
01|58899|17|1|NB4007-0016-3.50  TaperPlus BT40 ER16 Chuck 3.5 GL|Y
01|58899|18|1|NB4017-0016-5.00  TaperPlus BT40 ER16 Chuck 5 GL|Y
01|58905|30|1|1 FREE B40-1500-EU FOR EVERY HOLDER PURCHASED|Y
01|58923|1|1|*qty break pricing|Y
01|58923|2|1|*qty break pricing|Y
01|58923|3|1|*qty break pricing|Y
01|58939|3|1|Did torque test impressed by SK. Currently used ER|N
01|58940|3|1|Did torque test impressed by SK currently use ER.|N
01|58943|3|1|Interested in bullseye they need quote send it|N
01|58945|3|1|Interested in bullseye they need quote send it|N
01|58949|2|1|Consultant customer bought 401. Interested in work-|N
01|58949|2|2|holding an ddoing more table and tooling sales.|N
01|58950|2|1|Consultant customer bought 401. Interested in work-|N
01|58950|2|2|holding an ddoing more table and tooling sales.|N
01|58953|3|1|Interested in special head took them to mimatic|N
01|58954|3|1|Interested in special head took them to mimatic|N
01|58956|5|1|Promo table with trunnion.|N
01|58958|5|1|Promo table with trunnion.|N
01|58959|2|1|PLEASE SEND|N
01|58960|2|1|PLEASE SEND|N
01|58966|1|1|Reference RGA# TAR-48728|Y
01|58966|1|2|5AX-2MT-105-120SA-BR2 s/n: 8177|N
01|58968|1|1|Reference RGA# TAR-48647|Y
01|58968|1|2|TAT-400 s/n: 1515|N
01|58969|2|1|5AX-550FAM EARLY 2017 KOMO SPECIAL MACHINE JRP|N
01|58969|2|2|HELICOPTER PARTS|N
01|58969|2|3|Currently won NST500FAM Komo  NST300MHM MAZAK|N
01|58970|2|1|using tsudakoma mostly. send sales staff more often.|N
01|58970|2|2|Mr. Dave Word/Makino:Main  person to visitg for table|N
01|58970|2|3|Mr. Kismi/Makino:Main person to visit for tooling|N
01|58970|2|4|Referred by Mr. Takuji ISA/Makino|N
01|58972|2|1|5AX-550FAM EARLY 2017 KOMO SPECIAL MACHINE JRP|N
01|58972|2|2|HELICOPTER PARTS|N
01|58972|2|3|Currently won NST500FAM Komo  NST300MHM MAZAK|N
01|58973|1|1|Reference RGA# TAR-48647|Y
01|58973|1|2|CNC401TFAKSCN s/n: 6683|N
01|58975|2|1|using tsudakoma mostly. send sales staff more often.|N
01|58975|2|2|Mr. Dave Word/Makino:Main  person to visitg for table|N
01|58975|2|3|Mr. Kismi/Makino:Main person to visit for tooling|N
01|58975|2|4|Referred by Mr. Takuji ISA/Makino|N
01|58982|1|1|Nikken Special Boring Hldr per Nikken drawing provided.|Y
01|58982|1|2|Nikken part# BT30-30.4FC-130 /Otics part# UBH-68-T1|Y
01|58982|1|3|Customer must supply Sumitomo unit and Chip to complete|Y
01|58984|3|1|PAGE 14 INTERESTED IN SPEEDER SPOKE TO TIM REEVES|N
01|58984|3|2|NOT SURE WHO DISTRIBUTOR IS MILLING GRAPHITE|N
01|58986|8|1|*Customer buys bushing and installs into a block|Y
01|58986|8|2|they make|Y
01|58986|10|1|Block has bushing installed. Customer modifies blank|Y
01|58986|10|2|block set|Y
01|58986|14|1|Block has bushing installed. *Lyndex-Nikken modifies|Y
01|58986|14|2|block set upon receipt of spindle drawing|Y
01|58986|14|3|(modification charge --> net price)|Y
01|58989|2|1|Wants to buy  more ER32 soon. Bought a bunch of lyndex|N
01|58989|2|2|earlier instead of techniks. Gave Big Blue already.|N
01|58989|2|3|Also wants more ER8 collet adn ER8 Straight Shank.|N
01|58990|3|1|Need live tool for Mori NL Very interested in SK live|N
01|58990|3|2|tool an dregular SK. need info and visit to discuss and|N
01|58990|3|3|purchase improvements.|N
01|58991|3|1|MACHINE CHIRON  F2 HSK63A SEND QUOTE OF H63AFHM-ER25|N
01|58991|3|2|202|N
01|58994|2|1|Looking for manual tilt w/ rotary. Discussed NST|N
01|58995|2|1|Looking at getting a new machine at the show.|N
01|58995|2|2|Interested in getting a tooling package.|N
01|59000|6|1|Call to let know about live tool to fit there MAZAK|N
01|59000|6|2|Tool for lower turret. Capto 6|N
01|59001|2|1|This line at no charge as a courtesy to the customer|Y
01|59002|1|1|CALL!!|N
01|59002|2|1|Interested in 5AX201DA21FAM CNC180-260 w/installation|N
01|59002|2|2|chinese machine w/fanuc control|N
01|59003|1|1|TT preformed was impressed. Does only turning work.|N
01|59005|2|1|Interested in speedlock system|N
01|59006|1|1|Has Okuma lathe Haas machining center MATS|N
01|59006|3|1|Use ER & SF Holder|N
01|59006|4|1|Looking to add another machine to building #3|N
01|59007|3|1|QCFC Chuck and Collet potential for shop changing|N
01|59007|3|2|across the board.|N
01|59009|1|1|Looking for cheaper products|N
01|59012|1|1|Kerry is the presiden of the company he needs live tool|N
01|59012|1|2|for a Hwacheon lathe. I need make a model to determine|N
01|59012|1|3|what BMT series it will be.|N
01|59012|1|4|Kerry LT core buy back flyer I explained ICE technolog|N
01|59013|2|1|Table and TAT|N
01|59014|2|1|HAS MORI LATHES|N
01|59014|3|1|HAS MAZAK|N
01|59014|4|1|Looking for RAH for SAW C40 RAMER32|N
01|59017|2|1|Having chatter issuse saw SK videos wants to try SK|N
01|59020|1|1|Looking for a new lathe has not decided on which one|N
01|59020|1|2|yet. Send Catalogs Tom spoke with them.|N
01|59022|2|1|Interested for his 5 axis machine. Preformed demo|N
01|59023|5|1|Ryan is looking to change for ER to an advanced tool|N
01|59023|5|2|holding system Ryan mentioned shrink fit saw torque|N
01|59023|5|3|test|N
01|59024|2|1|Interested in rotary table|N
01|59026|2|1|Talked about 4th axis and live tooling|N
01|59026|2|2|How to indicate chuck on rotary table?|N
01|59028|2|1|However we do not offer bmt85 tool holders please|N
01|59028|2|2|take a look on the SK sytem in our BMT55 and BMT65|N
01|59028|2|3|rigidity and accuracy is much higher than regular ER|N
01|59028|2|4|System.|N
01|59029|2|1|R8 Collets page 128|N
01|59032|1|1|Chris to visit next week to discuss CST PBA 5ax DD|N
01|59033|2|1|VDI40 for Hyundai Wia|N
01|59034|4|1|Has lather needs live tools|N
01|59036|3|1|Live Tooling for Okuma|N
01|59037|3|1|TORQUE TEST|N
01|59037|4|1|CURRENT USE MILLING CHUCKS SHOWED VIDEOS SK/ER|N
01|59037|4|2|EXTREME MILLING CHUCK|N
01|59037|5|1|SHOWED SK LT DISCUSSED ICE TECHNOLOGY|N
01|59038|3|1|2HSK Milling chuck and extreme chuck|N
01|59038|3|2|Follow up after IMTS|N
01|59039|1|1|MULTISPINDLE FANUC ROBODRILL 2 HOLES 5-6MM 65 PITCH|N
01|59039|1|2|THRU HOLE BT30|N
01|59041|1|1|Purchasing CNCZ180LSABR2 W/TOOLING CERTIFICATE|N
01|59042|1|1|Reference RGA# TAR-48747|Y
01|59042|1|2|NSVX400MA s/n: 2094|N
01|59043|2|1|Trunion Table|N
01|59044|2|1|QCFC- Bearing work|N
01|59047|2|1|Buying a new OK M560 digital boring system SK VC|N
01|59047|2|2|Maybe getting a tooling CERT through Morris|N
01|59049|1|1|Reference RGA# TAR-48683|Y
01|59049|1|2|NST-250 s/n: 1250|N
01|59049|18|1|Wrire harness cable set - this is optional.|Y
01|59049|19|1|This is optional.|Y
01|59051|2|1|Stopped by no immediate interest. Asked for catalog|N
01|59051|2|2|on tables.|N
01|59052|2|1|90 degrees extended Live Tool|N
01|59053|2|1|Very interested in workholding and is a start up co.|N
01|59054|2|1|Looking at integration with nikken tables|N
01|59055|2|1|ROTARY JOINT FOR EXISTING 5AX130 HYDRAULIC 2 OR 4 PORT|N
01|59058|1|1|Currently uses Koma took a catalog with them|N
01|59061|1|1|Bob and Chris will visit. (Jeff Jensen Dis)|N
01|59062|1|1|Dave will be revamping his tool crib. Want Lyndex ER/SK|N
01|59062|1|2|Order will be a blanket order of sorts use bar code|N
01|59062|1|3|systems. Kip will contact cutomer.|N
01|59063|2|1|Looking for Trunnion|N
01|59064|1|1|DRILLMAX|N
01|59064|2|1|1/2 STUD ARBOR CAT40 6 GAGE TBA|N
01|59064|3|1|TAPER PLUS NHX400 JUST GOT NEW MACHINE WILL BE SPECIAL|N
01|59070|1|1|Have 6 year old fadal w/old Troyke gave him promo|N
01|59073|2|1|Mori NLX2580 wants multipule spindle output LT.|N
01|59073|2|2|Saw SK vs ER video. Call to follow up after IMTS|N
01|59074|2|1|NEW MAKINO PS-95 WANTS NIKKEN 5AX201 AWARE OF NEED TO|N
01|59074|2|2|USE TECHINTRON|N
01|59075|2|1|NZX 2500|N
01|59076|1|1|Possible gun parts multi-spindle table.|N
01|59077|2|1|Has a HAAS 5axis and hates it. He wants a 5ax-201|N
01|59077|2|2|Showed TT and he was impressed by SK results|N
01|59078|1|1|Freesmak|N
01|59078|1|2|Need Bob to go see customer|N
01|59080|3|1|Installation includes: Drive unit short bar fiber|Y
01|59080|3|2|optic cable communications cable bulk head cable set|Y
01|59080|3|3|external cables parameter changes service time and|Y
01|59080|3|4|travel.|Y
01|59081|2|1|Fill turret on new machine w/cat40 toolhoders|N
01|59081|2|2|prefferable sk cost sensative|N
01|59081|3|1|spindle speeder and fixed angle head economy|N
01|59084|3|1|Highspeed head waiting on the customer to find out|N
01|59084|3|2|which machine to put it on|N
01|59087|2|1|Installation Includes: Drive amps bulk head cable set|Y
01|59087|2|2|external cable sets communication cable fiber optic|Y
01|59087|2|3|cable parameter changes travel and labor for|Y
01|59087|2|4|installing two CNC180's on one Hwacheon Vesta 610D.|Y
01|59088|1|1|***SPECIAL IMTS PRICING***|Y
01|59088|2|1|Install Includes: Drive amp bulkhead cable set|Y
01|59088|2|2|external cable sets communication cable parameter|Y
01|59088|2|3|changes travel and labor for installing one 5AX-130|Y
01|59088|2|4|on one Hyundai Wia F500plus / Fanuc.|Y
01|59095|2|1|Harding Benchmarck QCFC INFO|N
01|59095|2|2|Talked about PC buy beek showed interested program|N
01|59097|2|1|Rotary project works with Bob already|N
01|59097|2|2|5AX-2MT-170-200-OSP Okuma 560B|N
01|59100|2|1|They are looking for RAH CAT40 send quote C40FHM-ER25|N
01|59100|2|2|195IC-65TP C40RAM-ER32-180-110TP|N
01|59103|2|1|SRM-20.0F  Reamer|Y
01|59103|5|1|FMM-20.0 Reamer|Y
01|59104|1|1|Special Mimatic U-Tool for Doosan Puma 2600LY ER25|Y
01|59104|1|2|output external coolant Max RPM 6000 Tq 50Nm|Y
01|59104|1|3|Customer to provide final dimensions|Y
01|59104|1|4|This is NET COST PRICE shown for 1pc purchase|Y
01|59104|3|1|Special Mimatic U-Tool for Doosan Puma 2600LY ER25|Y
01|59104|3|2|output external coolant Max RPM 6000 Tq 50Nm|Y
01|59104|3|3|Customer to provide final dimensions|Y
01|59104|3|4|This is NET COST PRICE shown for 2pcs purchased at same|Y
01|59104|3|5|time.|Y
01|59105|2|1|Quoted at a net price|Y
01|59105|2|2|Pricing reflects DIN modified holder|Y
01|59110|1|1|Tooling|N
01|59110|3|1|DD250L DV5100 Fanuc CNC 4th Axis ready DDRT Gun Parts|N
01|59112|4|1|Tom currentlyy uses our product line just wanted|N
01|59112|4|2|to stop by to see what new products we are offering|N
01|59113|2|1|Quote CaT50+BT40 1 standard gage|N
01|59114|2|1|SK20 Front End|N
01|59114|3|1|Has Doosan-No coolant thru|N
01|59115|1|1|Reference RGA# CUR-47549|Y
01|59115|1|2|C50RAM-ER32-285ST s/n: 56016 02|N
01|59115|3|1|Bearings seals and o-rings are worn and must be|Y
01|59115|3|2|replaced. Locating pin and hardware must be replaced.|Y
01|59115|3|3|Spindles must be resurfaced. Labor is included.|Y
01|59119|2|1|Sk Series|N
01|59119|3|1|Looking at Automation|N
01|59122|1|1|From Slightly Used Inventory|Y
01|59123|2|1|Is the Trunion catalog we need to send to the customer|N
01|59123|2|2|DMG Mill tap 700 Trunion Apllication not urgen but|N
01|59123|2|3|would like prices|N
01|59127|3|1|Already gave shrink fit catlaog.Very interested in|N
01|59127|3|2|shrink fit holders  and unit|N
01|59129|2|1|Need to send|N
01|59130|3|1|Tension Compresion ERCollet (new)|N
01|59130|4|1|Possible live tool purchase|N
01|59131|1|1|Send metro air gap sensor flyer high interes in metrol|N
01|59134|3|1|Also very interested in milling chucks.Tim showed both.|N
01|59134|3|2|Customer needs tool holder to mill with 1/2 EM on|N
01|59134|3|3|4340 material.Also needs holder to hold on 5/8shank|N
01|59134|3|4|thread mill.SK16 or SK20 would be suitable|N
01|59136|2|1|Interested in LT not priority at this time`|N
01|59139|2|1|Looking for a 5C collet system for a RT|N
01|59141|2|1|Would like literature for Nakamura live tools|N
01|59141|2|2|Currently using MD tool|N
01|59142|4|1|Familiar with LN interested in SF holders has dual|N
01|59142|4|2|contact|N
01|59145|4|1|Guns parts-interested in RT multi spindle & tailstock|N
01|59148|4|1|CNC 180 AA21 with mpower speedlock trunnionon|N
01|59148|4|2|with pneumatic vices|N
01|59149|5|1|Interested in 5AXIS fixturing shows ER+SK did TT|N
01|59149|5|2|the guy was impressed|N
01|59151|2|1|Just wanted catalog send and check with him in a|N
01|59151|2|2|couple weeks|N
01|59154|3|1|Plus torque wrench|N
01|59155|1|1|Tom Latourette put LN into a contac w/master chemical|N
01|59155|1|2|We call on the same customer and could benefit from|N
01|59155|1|3|forming a relation ship w/them|N
01|59156|2|1|5AX-1200MA-M  Mitsubishi Machine MVR25|N
01|59156|3|1|Angle Head 1/420 Drill & Tap C50-MRAM-ER16-ST|N
01|59156|3|2|4 head needed|N
01|59158|2|1|RT for Monarch Fanuc control full 4th axis interface|N
01|59159|2|1|Interested pallet rack w/RT|N
01|59162|1|1|Cable set included.|Y
01|59162|2|1|$1000 IMTS free tooling promo.|Y
01|59163|2|1|CNCz180 for a TCS2B|N
01|59164|1|1|Lookinf to same standar prototype shop|N
01|59168|3|1|Current customer uses tables +sk showed trunnion + vise|N
01|59170|1|1|Familiar with our product linemay have an immediate|N
01|59170|1|2|need for some products.reviewed sk20iceqcfcbuyback|N
01|59170|1|3|program.familiar with our ersk collet systems|N
01|59172|2|1|New Okuma LB3000 hitting the floor friday looking|N
01|59172|2|2|at LT and static tools took a catalog|N
01|59174|2|1|Shedule visit as soon as we return to Mexico|N
01|59193|2|2|Buying new machine|N
01|59194|3|1|Looking for twin spindle units + cat40|N
01|59197|3|1|New Nakamura5C-300|N
01|59197|4|1|Needs static tools|N
01|59197|4|2|also has Okuma|N
01|59200|2|1|Modular head with NSK attachement 1-1/2 dia ID/up to|N
01|59200|2|2|1/2 depth of cut|N
01|59201|3|1|Currently use our ER did TT were very impressed|N
01|59203|1|1|3pcs in stock in IL/ Balance pending ETA from factory|Y
01|59203|1|2|most likely 10 weeks delivery|Y
01|59204|4|1|Looking to buy a tooling pck high interest in SK also|N
01|59204|4|2|buying endmills|N
01|59209|4|1|Shrink fit demo performed Amir is getting new HSK63A|N
01|59209|4|2|machine with 30k spindle looking for SF|N
01|59213|1|1|Hold .001 repeatable @ .0005 cat50SKMC. They use our|N
01|59213|1|2|ER/SK has an immediate need for some cat50 SK162025|N
01|59214|1|1|dealer provides 4th/5th software and 4 spare M code|Y
01|59214|1|2|(2 per axis for clamp/unclamp)|Y
01|59217|4|1|Have Bob contact interested in SK|N
01|59221|2|1|Shopping for new machine|N
01|59227|1|1|In the market for dual contact BT50 tools prototype|N
01|59227|1|2|shopnot interested in SF|N
01|59228|3|1|CNC1600A21 special application for vertical use|N
01|59232|3|1|Performed TT seems impressed|N
01|59233|2|1|wants to learn more about SK & advanced tools|N
01|59238|2|1|Needs quote on CNC321FAM for Monarchmachine to replace|N
01|59238|2|2|existing table drive+interface is already there|N
01|59245|4|1|CONFIRMATION OF CABLE NEEDED|Y
01|59245|6|1|CONFIRMATION OF PROPER CABLE NEEDED|Y
01|59245|14|3|INSTALLATION INCLUDES HARDWARE INTERNAL CABLES. FIBER|Y
01|59245|14|4|OPTIC CABLEAMPLIFIER  TRAVEL & LABOR|Y
01|59261|1|1|Bought new mori mill 315 tool carrusel asked about|N
01|59261|1|2|tool certificated tool pack Kennametal offer 50% tool|N
01|59261|1|3|cert. Wanted to see what we do.|N
01|59262|1|1|This item is a Special and once an order is placed with|Y
01|59262|1|2|factory it may not be canceled or returned.|Y
01|59267|3|1|Used our holders at this previous shop new shop doesnt|N
01|59267|3|2|use LN its a lot of CNC lathes spoke about SK LT|N
01|59269|4|1|Chris saw the torque test and was impressed|N
01|59269|4|2|Also interested in MC|N
01|59270|5|1|D3 dimension 0.940|Y
01|59271|2|1|Very interested in buying a direct drive RT 200/250|N
01|59271|2|2|size already looked at Koma looking at differences|N
01|59274|3|1|5AX-250FA-M for DV-5080 MORI has been quoted.Needed to|N
01|59274|3|2|see benefits of our table vs. others|N
01|59275|1|1|Metrol H4A|N
01|59276|2|1|Customer prefers digital catalog we gave him USB|N
01|59278|1|1|Dont send catalog customer looking for coolant fed LT|N
01|59278|1|2|for Mazak similar to a coolant inducer|N
01|59282|3|1|Special pricing for IMTS 2016.|Y
01|59285|2|1|Okuma|N
01|59286|6|1|Special discount per Bob Berongi.|Y
01|59290|5|1|5-5005-700|N
01|59291|1|1|Competis agains Trinity in E32 wants to talk to cindy|N
01|59291|1|2|nick reg collet discount|N
01|59293|1|1|Looking for Elbo Preseter|N
01|59293|1|2|Wireless probe they want to measure dimens of|N
01|59293|1|3|discasting work pciece they can make program by themse|N
01|59293|1|4|Toolsetter they're considering soller tool presetter|N
01|59293|1|5|but they are interesting metrol tool setter|N
01|59293|1|6|MAKINO 5AXIS MC Discasting|N
01|59295|1|1|CAT40 MMC8 want these rebalanced will contact Lyndex|N
01|59295|1|2|wants metrol catalog they want to detect zero point|N
01|59295|1|3|before processing theyre considering metrol KLA series|N
01|59295|1|4|please refer p.11 yellow catalog|N
01|59297|1|1|Mold shop will buy one machining center and one cnc|N
01|59297|1|2|lathe at the begining of next year|N
01|59297|1|3|They will decide between okuma and DMGMori no later tha|N
01|59297|1|4|nov-16|N
01|59297|1|5|To make an apointment next week|N
01|59298|1|1|Mold shop will buy one machining center and one cnc|N
01|59298|1|2|lathe at the begining of next year|N
01|59298|1|3|They will decide between okuma and DMGMori no later tha|N
01|59298|1|4|nov-16|N
01|59298|1|5|To make an apointment next week|N
01|59299|3|1|cutter grinding co. wants to sell packages|N
01|59299|3|2|worked qith Bob b in the past|N
01|59301|2|1|Uses a zoller SF Machine|N
01|59301|2|2|Quote Start 2 package include 10 holders|N
01|59303|3|1|Fanuc Rob-10k spindle TI21 long bed CNZ180FAM|N
01|59303|3|2|W/RJ for hydr. fixture existing machine.|N
01|59303|3|3|Deals w/ methods and Maruka  contact|N
01|59304|1|1|Torque Testvery impressed with torque test|N
01|59304|1|2|Wants to purchase an SKuses techniks now and doesn't|N
01|59304|1|3|have real issue but sees major benefit to SK holder|N
01|59304|1|4|video|N
01|59306|3|1|Showed of SX vs SK was very impressed on how much the|N
01|59306|3|2|sk grippes over SX|N
01|59306|3|3|I spoke about test holder|N
01|59306|4|1|Went over LT program SK output for Doosan lathe also|N
01|59306|4|2|ICE for LT|N
01|59308|2|1|Extension note page.42 straigh shank ER|N
01|59308|2|2|needs OD 6MM tool|N
01|59311|3|1|Both mazak LT catalogue|N
01|59312|2|1|Looking at right anglehead for drilling application|N
01|59312|2|2|Send questionarre|N
01|59314|3|1|RT + tool holders general interest|N
01|59320|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|59321|1|1|2 pieces are stock at factory - ETA 1-2 wks ARO|Y
01|59321|1|2|2 pieces ETA 10 weeks mfg + 1-2 wks shipping ARO|Y
01|59322|1|1|Per Chris B not send any catalogue|N
01|59322|2|1|SK HOLDERS OKUMA LT QCFC|N
01|59324|1|1|Tienen problemas de oxidacion marca sowa distrib|N
01|59324|1|2|herramientas de corte atiende noreste de mexico|N
01|59324|1|3|importa de CA to Tijuana compra de Marshall Tools|N
01|59325|3|1|RT|N
01|59325|4|1|Very interested|N
01|59328|3|1|Wants Okuma catalogwe already sell them tooling|N
01|59329|1|1|Strong possibility to do a sales activity|N
01|59332|1|1|Strong possibility to do a sales activity|N
01|59334|1|1|Blake to deliver Illinois ind company need it update|N
01|59339|1|1|Motor MGC machine stators looking to buy a lathe|N
01|59339|1|2|mori takisawa show torq test &LT should call for|N
01|59339|1|3|follow up|N
01|59342|2|1|Xtreme chuck cat50 Horizontals|N
01|59342|3|1|110 ftlbs ER40 RAH|N
01|59344|2|1|Looking to boy  Haas Live & Static tooling right away|N
01|59345|2|1|Richard just needs big blue|N
01|59347|4|1|Pull out of cutting tools with ER discussed milling ch|N
01|59348|1|1|Quoted at a net price|Y
01|59351|2|1|Machine Haas maquinado de moldes|N
01|59351|3|1|CAT40|N
01|59358|2|1|Have a project send catalog and ask for part|N
01|59359|2|1|Carbide inserts distributor is dealing a project|N
01|59359|2|2|involving a 14 used okuma machine centers tooling|N
01|59359|2|3|aroud 50 cat40 holders|N
01|59359|8|1|Send a quote of MZQT47-BG10Z-C 1 pc|N
01|59361|2|1|SK demo wants to try SK-Collets etc|N
01|59361|3|1|wants ER bearing nut a collet|N
01|59362|2|1|Coolant Inducer CAT501.1/4 Milling chuck|N
01|59364|2|1|Milling chuck pg 141|N
01|59373|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|59383|1|1|Pricing reflects purchase of Start 2 and 15 BT40|Y
01|59383|1|2|standard shrink fit holders.|Y
01|59390|4|1|5ax350- new machine|N
01|59392|2|1|Spoke to greg about our high precision tool holders|N
01|59392|2|2|He does medical work and need to hold tigh tolerances|N
01|59392|2|3|for drill mills reamers.|N
01|59393|2|1|Custom toolspeaking with Mimatic needs a very rigid|N
01|59393|2|2|holder to cut titanium|N
01|59394|1|1|OKK Cat50 cat40 ROTO Machine HSK63 35K RPM USING|N
01|59394|1|2|Big Kaiser Haimer show TT videos.|N
01|59394|1|3|7 cnc tool & die shop|N
01|59396|2|1|Paul is interested in a modular AH with NSK|N
01|59396|2|2|attachments HSK63 catalog please|N
01|59401|2|1|Looking to buy a new high speed machine|N
01|59401|3|1|Went over VCMMCand shrink fit|N
01|59402|2|1|CNC180 & 260. Want to see general info of CNC. Want to|N
01|59402|2|2|see outside dimentions as well (easy type).|N
01|59403|4|1|Did a torque testhe is aprogrammer and is very|N
01|59403|4|2|impressed.Wants SK and other tools|N
01|59403|4|3|Wants our tool data in mastercam|N
01|59404|3|1|he uses ER went over briefly with him SK. but only IMTS|N
01|59404|3|2|for a short time and is trying to see everything.|N
01|59404|3|3|*Newer to machining*|N
01|59404|4|1|Spindle speeder. he is looking to get into micro|N
01|59404|4|2|machining but needs higher speeds to do it.|N
01|59404|4|3|Email him a spindle speeder quenstionare.|N
01|59407|2|1|Has 5 axis interested in SK series using Haimer|N
01|59410|2|1|Looking for manual rotary orignally. Now interested in|N
01|59410|2|2|rotary with independent control. Also using heat shrink|N
01|59410|2|3|Interested in SK. Interested in milling chucks.|N
01|59410|2|4|Gave rotary table  catalog.|N
01|59422|2|1|ER vs SK live tooling was showed|N
01|59426|4|1|Browsing using LN already interested in coolant opt|N
01|59426|4|2|on SK & VC|N
01|59430|2|1|Looking for indexer for old machine|N
01|59432|1|1|Tooling Certificate Number: TBD|Y
01|59437|2|1|Looking to purchase|N
01|59437|2|2|Start 2 -preset springs|N
01|59440|2|1|Shrink fit router bits|N
01|59441|1|1|VF-4 Sigma 5AX 2MT-105-120YA-M call to discuss applic|N
01|59441|1|2|Trident 30600|N
01|59443|4|1|Interested in sk vc mill chuck has knock off sk|N
01|59443|4|2|has a lot of trouble with getting holders want to buys|N
01|59443|4|3|more for/new machine|N
01|59445|1|1|Shrink fit unit cooling tower 2 CAT40 taper pots|Y
01|59445|1|2|& set of heat induction rings.|Y
01|59445|2|1|Shrink fit unit cooling tower 10 standard CAT40 SF|Y
01|59445|2|2|holders 2 CAT40 taper pots & set of heat induction|Y
01|59445|2|3|rings.|Y
01|59446|2|1|Quick Change Thomas gave him information|N
01|59451|1|1|Potential for distribution|N
01|59452|1|1|Spoke about AH & RT kyle took catalog with him i gave|N
01|59452|1|2|DD card before he left|N
01|59456|1|1|DOR250 for 4 spindles ct 250 RPM|N
01|59457|3|1|Mold manufacturer we would promote SK|N
01|59458|3|1|Just got a new YCM machining center work on tooling|N
01|59458|3|2|package.|N
01|59459|1|1|Produces molds for glass bottles have 2 5AX-201FA|N
01|59459|1|2|sold by Hemaq.|N
01|59459|1|3|Confirm appointment sales call next week|N
01|59459|3|1|Working on CAT SK Tooking Package|N
01|59461|3|1|Mori NT4250 looking for hobbing head spoke w/ yuyi|N
01|59461|3|2|from ALPS can quote cindy gave her card to him he show|N
01|59461|3|3|he saw these at DMG M.|N
01|59462|2|1|Tooling package for Speedio BT30|N
01|59462|3|1|Buying a Speedio S-series 15000rpm|N
01|59462|3|2|Needs 5AX-100 or 5AX-2MT|N
01|59463|3|1|Spoke to him about SK live tool and ICE he seems|N
01|59463|3|2|interested.|N
01|59464|3|1|Has Okuma LB3000|N
01|59464|4|1|Spindle Speeder running 1/8 end mill needs  12k tool|N
01|59464|4|2|steel D2|N
01|59465|1|1|Just wanted to get new catalogs|N
01|59466|3|1|Did TT was very impressed|N
01|59467|2|1|Looking for a LT and a interested in our Quick change|N
01|59467|2|2|system they would like some one to shop by discuss|N
01|59467|2|3|things with them|N
01|59467|2|4|``|N
01|59469|2|1|Buys from Alro needs HSK100A-SM0750-8.00|N
01|59470|2|1|Pullout issuse with Big Kaiser 1 and 1/2 shank|N
01|59470|2|2|Currently using Hydraulic wants to try Xtreme Chuck|N
01|59471|2|1|Has a need for a CAT40 ER321 RAH also looking to buy|N
01|59471|2|2|a new Doosan Puma Lathe.|N
01|59473|2|1|Looking to integeate robot on lathe|N
01|59474|1|1|New NLX4000 12K Spindle|N
01|59474|1|2|Ike Brott's brother haven't spoke to in 15+ years|N
01|59475|2|1|Wants help with start up on new parts.|N
01|59476|1|1|Was joining customer on record 52|N
01|59477|6|1|ICE 90 degree LT|N
01|59478|2|1|Spoke to hima bout the modular RAH. He took the modular|N
01|59478|2|2|catalog needs 4 small OD angleheads. Told him about|N
01|59478|2|3|the questionairre he needs to fill out.|N
01|59479|2|1|Was showed a TT|N
01|59480|3|1|DD250-RT|N
01|59483|1|1|Is a distributor in Canada he would like catalog for|N
01|59483|1|2|reference he currently sell our product|N
01|59484|4|1|Their lathe department doesn't know about SK Live tools|N
01|59484|4|2|Wanted more updated information|N
01|59485|1|1|Is a distributor in Canada he would like catalog for|N
01|59485|1|2|reference he currently sell our product|N
01|59486|2|1|Looking for a special angle live tool 48 degrees.|N
01|59486|2|2|Buying new machine maybe Okuma. Please Contact.|N
01|59487|3|1|Bobs customer gun parts|N
01|59488|2|1|Looking for RAH for Toshiba Viz|N
01|59489|3|1|Very interested over 200 machines uses Doosan +Big plus|N
01|59489|3|2|familiar w/ RT is willing to test and try doesnt know|N
01|59489|3|3|who sale rep from LN is|N
01|59491|2|1|Looking for 80 size collets & chucks for new cnc lathe|N
01|59492|2|1|Quote CST-100|N
01|59493|2|1|Uses over MC's|N
01|59493|7|1|Has a few Okuma Lathes no live tools yet|N
01|59494|1|1|Independent application rep. Uses our line wants ref|N
01|59494|1|2|material|N
01|59495|2|1|Looking for 5AX-200 maybe new machine maybe old mazak|N
01|59496|5|1|Currently using different machine might want new one in|N
01|59496|5|2|the near future|N
01|59498|1|1|Customer needs CAT50 AH with 12 projection|N
01|59498|1|2|to interplolate pocket in 4.5 diameter hole and 6|N
01|59498|1|3|diameter.|N
01|59499|2|1|Jewett machine Craig Cottrell Remco Windsor lots of|N
01|59499|2|2|Okuma LT looking to buy|N
01|59500|2|1|Want to purchase a few right away  just have inside|N
01|59500|2|2|call and quote|N
01|59503|1|1|Currenly has a Pioneer Milling Chuck and not pleased.|Y
01|59504|1|1|4th axis RT w/tronion CNC180 on mitsubishi CNC|N
01|59505|1|1|CNCZ180 uses nikken tables wanted to look around|N
01|59506|1|1|Send CNC160 w/tronion page by email|N
01|59506|1|2|4th axis RT w/tronion CNC180 mitsubishi controller|N
01|59507|2|1|Send video link for Haas 5th axis vertical mill|N
01|59507|2|2|Did SF demo looking to pull trigger on SF machine|N
01|59507|2|3|soon as well|N
01|59507|3|1|Has old tecnics machine 5AX-170|N
01|59507|3|2|Ready to buy new mill need 5th axis|N
01|59507|3|3|`|N
01|59512|1|1|Includes SF unit+10 standard HSK32E shrink fit holders|Y
01|59517|1|1|Quoted at a net price|N
01|59518|3|1|Wants high speed SK holders over current ER holders|N
01|59519|4|1|Includes: Axis drive bulkhead cable set external|Y
01|59519|4|2|cable set axis expansion card parameter changes|Y
01|59519|4|3|travel and labor for install on Mori DV5100|Y
01|59520|14|3|INSTALLATION INCLUDES HARDWARE INTERNAL CABLES. FIBER|Y
01|59520|14|4|OPTIC CABLEAMPLIFIER  TRAVEL & LABOR|Y
01|59521|3|1|Wants high speed SK holders over current ER holders|N
01|59522|3|1|Installation includes: Drive unitshort barfiber optic|Y
01|59522|3|2|cablebulkhead cablesexternal cablesparameter changes|Y
01|59522|3|3|service time and travel.|Y
01|59529|4|1|Sean currently uses and likes our Milling chucks TIm|N
01|59529|4|2|Lowe talked about the SK chuck. Tim said that he would|N
01|59529|4|3|stop in next time he is in the area.|N
01|59530|4|1|Sean currently uses and likes our Milling chucks TIm|N
01|59530|4|2|Lowe talked about the SK chuck. Tim said that he would|N
01|59530|4|3|stop in next time he is in the area.|N
01|59531|14|3|INSTALLATION INCLUDES HARDWARE INTERNAL CABLES. FIBER|Y
01|59531|14|4|OPTIC CABLEAMPLIFIER  TRAVEL & LABOR|Y
01|59532|2|1|Has Nakamura Lathe and Swiss Lathes. L.T. small sh for|N
01|59532|2|2|swiss. SK series 175.|N
01|59533|2|1|Has Nakamura Lathe and Swiss Lathes. L.T. small sh for|N
01|59533|2|2|swiss. SK series 175.|N
01|59535|3|1|5AX201ya-m-ab VF-series Haas -Needs quote through|N
01|59535|3|2|local dealer.|N
01|59537|3|1|5AX201ya-m-ab VF-series Haas -Needs quote through|N
01|59537|3|2|local dealer.|N
01|59538|2|1|KIA R. Table CNC202FA-M|N
01|59538|2|2|To replace existing table|N
01|59539|3|1|SPECIAL IMTS PACKAGE INCLUDES SHRINK FIT PACKAGE PLUS|Y
01|59539|3|2|15 TAPER PLUS TOOLS WITH COOLANT PORTS.|Y
01|59541|2|1|Machine tool builder interested in selling our tables.|N
01|59542|2|1|Machine tool builder interested in selling our tables.|N
01|59543|2|1|KIA R. Table CNC202FA-M|N
01|59543|2|2|To replace existing table|N
01|59544|3|1|Looking for RAH small profile. Send questionairre.|N
01|59545|8|1|Quoted for consideration|Y
01|59547|3|1|Looking for RAH small profile. Send questionairre.|N
01|59548|2|1|Torge test preformed Impressed|N
01|59549|2|1|Looking for 5ax-130 for graphite. Makino F3 current|N
01|59549|2|2|customer.|N
01|59550|2|1|Customer interested in SF. They are implementing this|N
01|59550|2|2|on a new cell.Magazine holders 320 holders per machine|N
01|59550|2|3|John liked FI5-B unit over the start II.|N
01|59550|2|4|Taper of machine HSK63A|N
01|59551|2|1|Looking for 5ax-130 for graphite. Makino F3 current|N
01|59551|2|2|customer.|N
01|59552|1|1|Tooling Certificate Number: TBD|Y
01|59554|1|1|This gentleman is a distributor of our product. Please|N
01|59554|1|2|send him some of our currrent catalogs for his|N
01|59554|1|3|customers personal reference|N
01|59556|1|1|This gentleman is a distributor of our product. Please|N
01|59556|1|2|send him some of our currrent catalogs for his|N
01|59556|1|3|customers personal reference|N
01|59557|1|1|Customer wants new literature|N
01|59558|2|1|Customer interested in SF. They are implementing this|N
01|59558|2|2|on a new cell.Magazine holders 320 holders per machine|N
01|59558|2|3|John liked FI5-B unit over the start II.|N
01|59558|2|4|Taper of machine HSK63A|N
01|59559|1|1|Customer wants new literature|N
01|59560|2|1|Torge test preformed Impressed|N
01|59561|2|1|Needs Coolant through the spindle live tools|N
01|59561|2|2|for Drilling application ice|N
01|59562|2|1|Needs Coolant through the spindle live tools|N
01|59562|2|2|for Drilling application ice|N
01|59564|4|1|5axis fanuc compatitble smallest table|N
01|59567|2|1|Daniel has interest in our tool holders he would like|N
01|59567|2|2|SF literature as well.|N
01|59569|2|1|Daniel has interest in our tool holders he would like|N
01|59569|2|2|SF literature as well.|N
01|59570|2|1|HSK63A Mazak to be delivered in 6 weeks looking @ SK|N
01|59570|2|2|and VC buys thorugh Western Tool-Russ|N
01|59571|4|1|5axis fanuc compatitble smallest table|N
01|59572|2|1|HSK63A Mazak to be delivered in 6 weeks looking @ SK|N
01|59572|2|2|and VC buys thorugh Western Tool-Russ|N
01|59573|1|1|Gave Shrinkfit demo.Customer is looking for a good|N
01|59573|1|2|simple unit for a job shop. Looking to buy ASAP!!|N
01|59574|2|1|Interested in 5-axis Machines. Owns 14 Haas machines|N
01|59575|1|1|Nakamura Lathe|N
01|59576|1|1|Nakamura Lathe|N
01|59577|2|1|Interested in 5-axis Machines. Owns 14 Haas machines|N
01|59578|1|1|Tooling Certificate Number: TBD|Y
01|59583|1|1|Gave Shrinkfit demo.Customer is looking for a good|N
01|59583|1|2|simple unit for a job shop. Looking to buy ASAP!!|N
01|59584|6|1|BT30 Brother Speedio|N
01|59585|6|1|BT30 Brother Speedio|N
01|59586|1|1|Gave Shrinkfit demo.Customer is looking for a good|N
01|59586|1|2|simple unit for a job shop. Looking to buy ASAP!!|N
01|59587|1|1|No notes|N
01|59588|1|1|No notes|N
01|59593|2|1|Interested in Okuma Live|N
01|59595|1|1|Follow up with customer and see how their new|N
01|59595|1|2|shrink fit machine works. Gave them line SF Demo|N
01|59597|1|1|Need to send new set of spring clip for SF|N
01|59597|1|2|machine they will be buying a new machine tooling|N
01|59597|1|3|package in Nov.|N
01|59599|1|1|Alex and I preformed torque test.Rocky was impressed|N
01|59599|1|2|ER vs. SK Live tool value. Intrested|N
01|59601|1|1|Reference RGA# TAR-48744|Y
01|59601|1|2|5AX-120BM s/n: NA|N
01|59601|3|1|Will be ordered upon receipt of purchase order to|Y
01|59601|3|2|proceed with repairs.|Y
01|59601|52|1|Rotary spindle is worn and has dimples this must be|Y
01|59601|52|2|re-plated and grounded.|Y
01|59601|52|3|Modification will begin upon receipt of purchase order|Y
01|59601|52|4|to proceed with repair.|Y
01|59602|1|1|Tim Lowe has met with them going to test sksf and mc|N
01|59602|1|2|will be good new customer|N
01|59615|1|1|Milling Chucks MDSK Adapters for pull studs torque|N
01|59615|1|2|wrenches|N
01|59618|2|1|Fadal older UMC. Fadal rotary SUW Rotary 20 years old|N
01|59618|2|2|approx looking to replace rotary.|N
01|59619|1|1|Table with Okuma motors and Air Braks.|Y
01|59619|2|1|IMTS $1K Tooling Certificate with purchase of table|Y
01|59619|2|2|good for list price tool holders.|Y
01|59620|2|1|Fadal older UMC. Fadal rotary SUW Rotary 20 years old|N
01|59620|2|2|approx looking to replace rotary.|N
01|59625|4|1|Mazak Machines x17|N
01|59625|5|1|7x Okuma's Saw ER vs. SK|N
01|59632|1|1|Needs SK Tooling has all Nikken on mills|N
01|59634|1|1|5AX-130 on Doosan DNM400 or 500 call after show need|N
01|59634|1|2|quote asap show gear and bearing system very impressed|N
01|59635|1|1|5AX-130 on Doosan DNM400 or 500 call after show need|N
01|59635|1|2|quote asap show gear and bearing system very impressed|N
01|59636|1|1|Gave fulltour of product line|N
01|59636|1|2|uses machining centered and turning centers|N
01|59637|1|1|Gave fulltour of product line|N
01|59637|1|2|uses machining centered and turning centers|N
01|59638|1|1|Bob uses Lyndex has old catalog|N
01|59639|1|1|Bob uses Lyndex has old catalog|N
01|59640|1|1|Mori/MZX/ Giedemeister live tool quick change|N
01|59641|3|1|Looking for 5 Axis solunion to drill D+E Blocks|N
01|59642|3|1|Looking for 5 Axis solunion to drill D+E Blocks|N
01|59644|1|1|Mori/MZX/ Giedemeister live tool quick change|N
01|59645|1|1|bOTH MIKE AND dAVE WERE IMPRESSED WITH TT AND CAN SEE|N
01|59645|1|2|THE BENEFIT OF SK. MENTIONED PURCHASING SOME TEST|N
01|59645|1|3|HOLDERS TO DO CASE STUDIES AT THEIR FACILITY|N
01|59646|1|1|General Interest|N
01|59647|1|1|bOTH MIKE AND dAVE WERE IMPRESSED WITH TT AND CAN SEE|N
01|59647|1|2|THE BENEFIT OF SK. MENTIONED PURCHASING SOME TEST|N
01|59647|1|3|HOLDERS TO DO CASE STUDIES AT THEIR FACILITY|N
01|59648|1|1|N/A|N
01|59649|1|1|General Interest|N
01|59650|1|1|N/A|N
01|59651|1|1|N/A|N
01|59653|1|1|N/A|N
01|59654|1|1|Doosan user interested in Doosan LT/RT/Tool holders|N
01|59655|2|1|Looking for a RT and Metrol Air Gap sensor.|N
01|59656|2|1|Looking for a RT and Metrol Air Gap sensor.|N
01|59658|1|1|Doosan user interested in Doosan LT/RT/Tool holders|N
01|59659|1|1|Just wants updated catalogs|N
01|59660|1|1|Just wants updated catalogs|N
01|59661|1|1|CNCZ100-2W-120AA21|N
01|59661|1|2|vertical use for grinder|N
01|59662|1|1|CNCZ100-2W-120AA21|N
01|59662|1|2|vertical use for grinder|N
01|59663|2|1|Has 16 total Machine Tools-8 mills 8 lathes send MNZ20|N
01|59663|2|2|+ angel head catalogs. Has 1 of our AH's|N
01|59664|2|1|Has 16 total Machine Tools-8 mills 8 lathes send MNZ20|N
01|59664|2|2|+ angel head catalogs. Has 1 of our AH's|N
01|59666|1|1|Customer interested wants to order|N
01|59667|1|1|John likes the modular AH system.|N
01|59667|1|2|John said he has the need for an attachment such as nsk|N
01|59668|1|1|John likes the modular AH system.|N
01|59668|1|2|John said he has the need for an attachment such as nsk|N
01|59669|1|1|Frank wants to improve tool life his current tool life|N
01|59669|1|2|sucks. Impressed with SK after torque test|N
01|59671|1|1|Frank wants to improve tool life his current tool life|N
01|59671|1|2|sucks. Impressed with SK after torque test|N
01|59674|1|1|Has spindle speeder inquiry to customer added|N
01|59674|1|2|on extra 15%A to make sale before closing imts|N
01|59677|1|1|Has spindle speeder inquiry to customer added|N
01|59677|1|2|on extra 15%A to make sale before closing imts|N
01|59679|3|1|looking at milling chuck and sk-Impressed by test|N
01|59680|1|1|Confirm if we can order tools for a Takisawa TMR100|N
01|59680|1|2|Mr. Zamudio was asking for a radial live tool|N
01|59680|1|3|he needs adjustable double sprindle|N
01|59681|1|1|Confirm if we can order tools for a Takisawa TMR100|N
01|59681|1|2|Mr. Zamudio was asking for a radial live tool|N
01|59681|1|3|he needs adjustable double sprindle|N
01|59682|2|1|Haas RT Mori Lathe Does 100pc - 1000pc Prototypes|N
01|59683|3|1|looking at milling chuck and sk-Impressed by test|N
01|59685|1|1|Customer has many Okuma and DMG lathes they are|N
01|59685|1|2|interested in our buyback program|N
01|59685|1|3|Paco should visit this customer along ahusa people|N
01|59687|4|1|Bill recently just purchased a machine and needs tool|N
01|59687|4|2|holders for this machine. Bill has considered SF but|N
01|59687|4|3|feels MC and SK will be sufficient at the time|N
01|59688|1|1|looking for keywagon cast iron to steel looking at|N
01|59688|1|2|modulars send questionairre|N
01|59689|1|1|looking for keywagon cast iron to steel looking at|N
01|59689|1|2|modulars send questionairre|N
01|59690|4|1|Bill recently just purchased a machine and needs tool|N
01|59690|4|2|holders for this machine. Bill has considered SF but|N
01|59690|4|3|feels MC and SK will be sufficient at the time|N
01|59691|2|1|CNC 105AAZ1 Show special send quote|N
01|59692|1|1|Hass -UF3 -3ss-4ss SK Milling Chucks Live Tool Boring|N
01|59692|1|2|NLX 1500. 200|N
01|59693|1|1|Purchasing a new machine by feb. Would consider LT|N
01|59693|1|2|or sk.|N
01|59695|1|1|Purchasing a new machine by feb. Would consider LT|N
01|59695|1|2|or sk.|N
01|59696|2|1|CNC 105AAZ1 Show special send quote|N
01|59700|3|1|ER vs. SK Collet Chuck|N
01|59700|6|1|Rotary Tables-Fadal Mazak Machines|N
01|59701|2|1|CNC 105AAZ1 Show special Send Quote|N
01|59702|3|1|ER vs. SK Collet Chuck|N
01|59702|6|1|Rotary Tables-Fadal Mazak Machines|N
01|59703|1|1|N/A|N
01|59704|2|1|Fresmak ViseBlocksc(very similar to robot demo 5ax-201)|N
01|59705|1|1|N/A|N
01|59706|2|1|CNC 105AAZ1 Show special Send Quote|N
01|59707|1|1|Ready to buy Taper Plus Mill ChucksMMC. Bob to visit|N
01|59708|2|1|Fresmak ViseBlocksc(very similar to robot demo 5ax-201)|N
01|59709|1|1|looking for 5AZ will be buying a Haas ZVF3 has a brothe|N
01|59709|1|2|uses BT30|N
01|59710|1|1|looking for 5AZ will be buying a Haas ZVF3 has a brothe|N
01|59710|1|2|uses BT30|N
01|59714|1|1|New today looking at 4th and 5th  axis rotary|N
01|59722|28|1|Quoted in consideration to 100-029(C) Rubber Sealed|N
01|59722|28|2|vs Coolant Sealed|N
01|59722|28|3|Quoted at a net price|N
01|59722|52|1|Quoted in consideration to 100-052(C)|Y
01|59722|52|2|Quoted at a net price|Y
01|59728|3|1|Spoke about Mori live and static holders possible test|N
01|59728|3|2|cut with SK tool|N
01|59730|3|1|Spoke about Mori live and static holders possible test|N
01|59730|3|2|cut with SK tool|N
01|59731|1|1|IMTS Special Discount|Y
01|59731|2|1|Installation Includes: Drive amps bulkhead cable set|Y
01|59731|2|2|external cable set communcation cable fiber optic|Y
01|59731|2|3|cable parameter changes travel and labor for|Y
01|59731|2|4|installing one 5AX-130 on one new Doosan VMC.|Y
01|59731|4|1|IMTS Special Discount|Y
01|59733|1|1|Current Distributor joint sales calls set Appts!!!!!|N
01|59736|1|1|Current Distributor joint sales calls set Appts!!!!!|N
01|59754|3|1|need to buy- cat50 & sk6|N
01|59759|8|1|Item is shown as YOUR NET COST. No further discount|Y
01|59759|8|2|will be given off this item.|Y
01|59759|9|1|Item is shown as YOUR NET COST. No further discount|Y
01|59759|9|2|will be given off this item.|Y
01|59759|16|1|Item is shown as YOUR NET COST. No further discount|Y
01|59759|16|2|will be given off this item.|Y
01|59759|27|1|Item is shown as YOUR NET COST. No further discount|Y
01|59759|27|2|will be given off this item.|Y
01|59759|35|1|Item is shown as YOUR NET COST. No further discount|Y
01|59759|35|2|will be given off this item.|Y
01|59759|36|1|Item is shown as YOUR NET COST. No further discount|Y
01|59759|36|2|will be given off this item.|Y
01|59759|97|1|This item is given in terms of NET price|N
01|59759|98|1|This item is given in terms of NET price|N
01|59759|103|1|Item is shown as YOUR NET COST. No further discount|Y
01|59759|103|2|will be given off this item.|Y
01|59759|104|1|Item is shown as YOUR NET COST. No further discount|Y
01|59759|104|2|will be given off this item.|Y
01|59763|3|1|need to buy- cat50 & sk6|N
01|59765|11|1|Quoted in consideration to 5/32|Y
01|59765|13|1|Quoted in consideration to 7/32|Y
01|59765|15|1|Quoted in consideration to 11/32|N
01|59765|17|1|Quoted in consideration to 13/32|Y
01|59767|4|1|Buying live tool package from Municipal Machine|N
01|59767|4|2|Nick Carron brought them by.|N
01|59768|4|1|Buying live tool package from Municipal Machine|N
01|59768|4|2|Nick Carron brought them by.|N
01|59773|2|1|Possibly will buy a rotary table in the next 6 months|N
01|59773|3|1|Richard is interested in spindle speeder for|N
01|59773|3|2|engraving.Also likes the modular AIT and quick change|N
01|59774|2|1|Possibly will buy a rotary table in the next 6 months|N
01|59774|3|1|Richard is interested in spindle speeder for|N
01|59774|3|2|engraving.Also likes the modular AIT and quick change|N
01|59775|3|1|Chris please do a special price on one SK collet|N
01|59775|3|2|holder|N
01|59776|3|1|Chris please do a special price on one SK collet|N
01|59776|3|2|holder|N
01|59777|1|1|6 ER 15 SF|Y
01|59778|2|1|has NTX2000 has some WTOneed more LTSshort for|N
01|59778|2|2|clearance. Show SK vs ER. Contact to work on IMTS|N
01|59778|2|3|special promo|N
01|59781|2|1|has NTX2000 has some WTOneed more LTSshort for|N
01|59781|2|2|clearance. Show SK vs ER. Contact to work on IMTS|N
01|59781|2|3|special promo|N
01|59782|1|1|Table with motor and Hydraulic braking.|Y
01|59782|1|2|Customer to supply motor number upon purchase.|Y
01|59782|2|1|Hydraulic booster for brake actuation. To be mounted|Y
01|59782|2|2|inside the motor cover.|Y
01|59788|2|1|Has Doosan Mori & Haas - Liked the SK Live|N
01|59788|5|1|Needs RA Head for Haas BT40|N
01|59792|1|1|M6 ISO|Y
01|59792|2|1|M6M8 ISO*|Y
01|59792|3|1|M8M10 ISO*|Y
01|59792|4|1|M10 ISO|Y
01|59792|5|1|M9M12 ISO|Y
01|59796|2|1|Has Doosan Mori & Haas - Liked the SK Live|N
01|59796|5|1|Needs RA Head for Haas BT40|N
01|59801|1|1|12 week lead time based on qty quoted|Y
01|59801|3|1|Includes Table motors and cables.|Y
01|59801|4|1|Includes table motors cables and hyd unit|Y
01|59803|3|1|This product is given in terms of NET price.|Y
01|59806|1|1|SOL SE Seminar Interest Cindy|N
01|59807|1|1|SOL SE Seminar Interest Cindy|N
01|59810|1|1|Interested in Solution selling|N
01|59811|1|1|Interested in Solution selling|N
01|59816|1|1|tOUCH PROBE AND TOOL WEAR MEASURMENT|N
01|59816|1|2|HAS A HI SPEED SPINDLE MOUNTED ON A ROBOT HIGHLY|N
01|59816|1|3|AUTOMATED SET UP NEED TO MANAGE TOOL WEAR AND BREAKAGE|N
01|59818|2|1|Installation: Dual axis drive unit short bar fiber|Y
01|59818|2|2|optic cable communications cables bulkhead cables|Y
01|59818|2|3|external cables parameter changes service time and|Y
01|59818|2|4|travel.|Y
01|59819|2|1|NSK attachment extension- Competing with Technara!|N
01|59821|2|1|Crossed from Mimatic Part# 05.0611.6840.505|Y
01|59821|2|2|This item is eligible for the Live Tool Core Buy Back!|Y
01|59821|2|3|See additional flyer sent with this quote for details!|Y
01|59823|3|1|MMC oull through the back typeagreed a lot about|N
01|59823|3|2|milling chuck has some already|N
01|59824|2|1|NSK attachment extension- Competing with Technara!|N
01|59836|3|1|Currently uses Lyndex holders.Possibly interested in|N
01|59836|3|2|more advanced products|N
01|59836|5|1|Has Haas rotary table currently.May be considering|N
01|59836|5|2|more robist table|N
01|59843|3|1|General interest|N
01|59843|4|1|General interest|N
01|59845|2|1|3 pcs ETA 1 Week ARO balance ETA 10/17|Y
01|59846|3|1|General interest|N
01|59846|4|1|General interest|N
01|59849|4|1|Kitamura|N
01|59850|4|1|Kitamura|N
01|59852|1|1|No Notes|N
01|59853|1|1|No Notes|N
01|59857|1|1|No notes|N
01|59859|1|1|No notes|N
01|59860|3|1|HSK50 Tooling for chiron Needs gold catalog for better|N
01|59860|3|2|selection|N
01|59861|1|1|No notes|N
01|59862|1|1|No notes|N
01|59865|1|1|No notes|N
01|59867|1|1|No notes|N
01|59869|3|1|HSK50 Tooling for chiron Needs gold catalog for better|N
01|59869|3|2|selection|N
01|59870|2|1|Just wants normal rotary catalog has our tables.|N
01|59871|2|1|Just wants normal rotary catalog has our tables.|N
01|59872|1|1|no notes|N
01|59873|1|1|no notes|N
01|59874|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|59874|3|2|external cable set communication cable fiber optic|Y
01|59874|3|3|cable parameter changes travel and labor for|Y
01|59874|3|4|installing one rotary table on one Hwacheon Vesta 1000|Y
01|59874|3|5|VMC.|Y
01|59875|1|1|Muitus lower turret static upper turret c6|N
01|59875|1|2|about to tool up c6 stock in japan|N
01|59876|1|1|Muitus lower turret static upper turret c6|N
01|59876|1|2|about to tool up c6 stock in japan|N
01|59877|4|1|CAT40-SK25 ***Torque Test Demo***|N
01|59877|6|1|Bought 2 Mazak Lathes and 1 VM Mazak at the show!|N
01|59878|4|1|CAT40-SK25 ***Torque Test Demo***|N
01|59878|6|1|Bought 2 Mazak Lathes and 1 VM Mazak at the show!|N
01|59879|1|1|RT QCFC CHUCK AND COLLETS SERIES 65 ALREADY CUSTOMER|N
01|59880|1|1|RT QCFC CHUCK AND COLLETS SERIES 65 ALREADY CUSTOMER|N
01|59881|1|1|sk/MC TOOLING USES ER NOW|N
01|59882|1|1|sk/MC TOOLING USES ER NOW|N
01|59883|1|1|Customer is interested in SK live tool and Rotary|N
01|59883|1|2|Tables.|N
01|59883|1|3|Chris B is to go see this customer!!|N
01|59884|1|1|5 pieces STOCK|Y
01|59884|1|2|9 pieces 2 weeks|Y
01|59884|1|3|balance of 6 pieces 5 weeks|Y
01|59887|1|1|Customer is interested in SK live tool and Rotary|N
01|59887|1|2|Tables.|N
01|59887|1|3|Chris B is to go see this customer!!|N
01|59889|1|1|Chris to follow up with Steve|N
01|59889|1|2|e|N
01|59890|1|1|Chris to follow up with Steve|N
01|59890|1|2|e|N
01|59899|1|1|Tooling Certificate Number:20880-789-051916|Y
01|59901|1|1|Looking into it for a future option|N
01|59902|1|1|Looking into it for a future option|N
01|59903|1|1|David is new with Makino he is an applicaiton engineer|N
01|59903|1|2|David would like osm literature. Also I would like to|N
01|59903|1|3|get him some test holders to illustrate the quality|N
01|59903|1|4|of our holders.|N
01|59904|1|1|inq-c-hc-er|N
01|59905|1|1|Ship Catalogs|N
01|59908|1|1|Ship Catalogs|N
01|59909|1|1|David is new with Makino he is an applicaiton engineer|N
01|59909|1|2|David would like osm literature. Also I would like to|N
01|59909|1|3|get him some test holders to illustrate the quality|N
01|59909|1|4|of our holders.|N
01|59910|1|1|Inq-sf/vc|N
01|59911|1|1|Inq-sf/vc|N
01|59913|1|1|Special hsk32 32mm hydraulic|N
01|59914|1|1|Special hsk32 32mm hydraulic|N
01|59915|1|1|Looking to buy samsung lathe with y axis and sub spindl|N
01|59916|1|1|Looking to buy samsung lathe with y axis and sub spindl|N
01|59917|1|1|Inq-sk-er|N
01|59918|1|1|Inq-sk-er|N
01|59919|2|1|Full special-5 AX-Centerline of trunion 150mm below|N
01|59919|2|2|center line|N
01|59921|2|1|Full special-5 AX-Centerline of trunion 150mm below|N
01|59921|2|2|center line|N
01|59922|2|1|Wants catalog shop is a bit slow. Not buying new eqiup|N
01|59922|2|2|this year. both lathes and mills.|N
01|59923|2|1|Wants catalog shop is a bit slow. Not buying new eqiup|N
01|59923|2|2|this year. both lathes and mills.|N
01|59925|2|1|One of order looking for table for horizontal|N
01|59926|1|1|Problems with SK16 1/2 when tool breaks it breaks|N
01|59926|1|2|at the tip of the collet and the collet spins in the|N
01|59926|1|3|holder therefore ruining the holder|N
01|59926|1|4|need to visit show and see problem in person they|N
01|59926|1|5|are interested in trying a milling chuck for roughing|N
01|59929|1|1|Problems with SK16 1/2 when tool breaks it breaks|N
01|59929|1|2|at the tip of the collet and the collet spins in the|N
01|59929|1|3|holder therefore ruining the holder|N
01|59929|1|4|need to visit show and see problem in person they|N
01|59929|1|5|are interested in trying a milling chuck for roughing|N
01|59931|2|1|Looking for 1:2 gear ratio live tools. Customer needs|N
01|59931|2|2|added RPM output.|N
01|59932|2|1|Looking for 1:2 gear ratio live tools. Customer needs|N
01|59932|2|2|added RPM output.|N
01|59933|1|1|86622  UMCC0750-008|Y
01|59934|3|1|Interested in our rotary table design. I went through|N
01|59934|3|2|the differences between us and Koma/Kitigawa design &|N
01|59934|3|3|construction.-CB|N
01|59935|2|1|General inquiry wants Big Blue-Has some of out tooling|N
01|59936|3|1|Interested in our rotary table design. I went through|N
01|59936|3|2|the differences between us and Koma/Kitigawa design &|N
01|59936|3|3|construction.-CB|N
01|59937|1|1|high interest in skvc chucks|N
01|59937|1|2|wants to use around shop|N
01|59938|5|1|Showed torque testwas very impressed. They are now|N
01|59938|5|2|looking at SK live tools. Also will look at vertical|N
01|59938|5|3|CNC mill tools|N
01|59939|2|1|General inquiry wants Big Blue-Has some of out tooling|N
01|59940|1|1|high interest in skvc chucks|N
01|59940|1|2|wants to use around shop|N
01|59941|5|1|Showed torque testwas very impressed. They are now|N
01|59941|5|2|looking at SK live tools. Also will look at vertical|N
01|59941|5|3|CNC mill tools|N
01|59942|3|1|Brad uses a lot of Lyndex product.|N
01|59942|3|2|Needs catalog for reference|N
01|59943|3|1|Brad uses a lot of Lyndex product.|N
01|59943|3|2|Needs catalog for reference|N
01|59944|2|1|Has Doosan Mori & Haas - Liked the SK Live|N
01|59944|5|1|Needs RA Head for Haas BT40|N
01|59950|1|1|High Speed Rotary Table with 180mm Faceplate.|Y
01|59950|4|1|5AX-350 INCLUDES MELDAS MOTORS AND WIRE HARNESS|Y
01|59950|4|2|ALSO INCLUDED IS HYDRAULIC UNIT FOR TABLE BRAKE|Y
01|59950|4|3|SPECIAL PRICING|Y
01|59954|3|1|BMT65|N
01|59955|3|1|BMT65|N
01|59956|4|1|Send questionarie|N
01|59963|2|1|Interested in rotart table for Haas Machine.|N
01|59964|1|1|Mori DU5100 cut mostly ceramic very interested in flex|N
01|59964|1|2|collet and chucks. Call to follow hsk63a. Possible|N
01|59964|1|3|5AX-200?|N
01|59965|2|1|Interested in rotart table for Haas Machine.|N
01|59966|1|1|Mori DU5100 cut mostly ceramic very interested in flex|N
01|59966|1|2|collet and chucks. Call to follow hsk63a. Possible|N
01|59966|1|3|5AX-200?|N
01|59967|1|1|Current Nikken user high speed 1 month|N
01|59967|1|2|until new Matsuura|N
01|59968|1|1|Current Nikken user high speed 1 month|N
01|59968|1|2|until new Matsuura|N
01|59969|4|1|Send questionarie|N
01|59972|2|1|Manual NMTB50 Horizontal Machine needs precision drill|N
01|59972|2|2|chuck.|N
01|59973|2|1|Manual NMTB50 Horizontal Machine needs precision drill|N
01|59973|2|2|chuck.|N
01|59974|1|1|Customer is interested in rotary table 5AX multiple|N
01|59974|1|2|table. Please call him. He is in Chicago Office|N
01|59975|2|1|Spoke about Milling chuck and extreme chuck.|N
01|59975|3|1|Barry Currently has Pioneer milling chuck and is not|N
01|59975|3|2|overly pleased. We discussed our milling chuck and|N
01|59975|3|3|Xtreme Milling Chuck. He also feels our Milling Chuck|N
01|59975|3|4|would perform better then pioneer.|N
01|59975|5|1|Customer uses our ER product already. He likes the|N
01|59975|5|2|aspect of SK.|N
01|59976|1|1|Needs information live tools|N
01|59977|1|1|Customer is interested in rotary table 5AX multiple|N
01|59977|1|2|table. Please call him. He is in Chicago Office|N
01|59978|2|1|Spoke about Milling chuck and extreme chuck.|N
01|59979|1|1|Customer was pleased when he saw sf promo for imts|N
01|59979|1|2|Looking for a sf machine|N
01|59979|1|3|Power grip from rego referenced to compare price|N
01|59980|1|1|Customer was pleased when he saw sf promo for imts|N
01|59982|1|1|Needs volumetric milling MDSK SK Series|N
01|59984|2|1|Needs info on Rotary Tables. Looking into possibly|N
01|59984|2|2|using our workholding sysstems as well.|N
01|59985|1|1|Needs volumetric milling MDSK SK Series|N
01|59986|2|1|Needs info on Rotary Tables. Looking into possibly|N
01|59986|2|2|using our workholding sysstems as well.|N
01|59987|1|1|CNC601 or capable of 15K lbs Lubbuck Tx Agriculture|N
01|59988|1|1|CNC601 or capable of 15K lbs Lubbuck Tx Agriculture|N
01|59989|2|1|Looking for fixtruing ideas. Send info regarding|N
01|59989|2|2|M Power fixture.|N
01|59991|1|1|5ax for Haas Long Term project|N
01|59993|2|1|Looking for fixtruing ideas. Send info regarding|N
01|59993|2|2|M Power fixture.|N
01|59994|1|1|5ax for Haas Long Term project|N
01|59995|2|1|5-axis rotary for robodrill. 5ax-130 or 5ax-100|N
01|59997|1|1|No notes|N
01|59998|2|1|5-axis rotary for robodrill. 5ax-130 or 5ax-100|N
01|60002|3|1|Installation includes: Dual axis drive unit short bar|Y
01|60002|3|2|fiber optic cables communications cables bulkhead|Y
01|60002|3|3|cables external cables parameter changes service|Y
01|60002|3|4|time and travel.|Y
01|60005|1|1|No notes|N
01|60006|2|1|CASH FOR CLUNKER|N
01|60009|2|1|CASH FOR CLUNKER|N
01|60017|1|1|No immediate need but is familiar with Lyndex Nikken|N
01|60017|1|2|and regularly buys our products through E & R indust.|N
01|60017|1|3|Job Shop that runs DMG Mori and Okuma Lathes several|N
01|60017|1|4|machining centers.|N
01|60019|1|1|No immediate need but is familiar with Lyndex Nikken|N
01|60019|1|2|and regularly buys our products through E & R indust.|N
01|60019|1|3|Job Shop that runs DMG Mori and Okuma Lathes several|N
01|60019|1|4|mahcining centers.|N
01|60022|2|1|5-axis 6-7 inch parts. Need to purchase but down the|N
01|60022|2|2|road. Mori Machine.|N
01|60023|2|1|5-axis 6-7 inch parts. Need to purchase but down the|N
01|60023|2|2|road. Mori Machine.|N
01|60026|3|1|offered IMTS Promo 5 extra holders-Looking at package|N
01|60032|3|1|Looking to integrate 5AX and Haas VMC|N
01|60036|3|1|Looking to integrate 5AX and Haas VMC|N
01|60037|13|1|THIS IS NIKKEN BULLS EYE CHUCK. THIS IS NOT FLOATING|Y
01|60037|13|2|BUT THIS CAN BE ADJUSTED TO COMPENSATE FOR TOOL|Y
01|60037|13|3|RUNOUT. PLEASE SPECIFY SIZE NEEDED|Y
01|60038|2|1|General info wants to update his info|N
01|60041|2|1|Mazak QTN200 Series MZQT47 tooling interested in|N
01|60041|2|2|2pcs MZQT47-ER25X-OFF-HS|N
01|60041|2|3|1PC MZQT47-ER32Z-MS|N
01|60043|1|1|Doosan BMT 45 Tooling|N
01|60044|2|1|General info wants to update his info|N
01|60045|2|1|Mazak QTN200 Series MZQT47 tooling interested in|N
01|60045|2|2|2pcs MZQT47-ER25X-OFF-HS|N
01|60045|2|3|1PC MZQT47-ER32Z-MS|N
01|60049|2|1|Shopping for table has Mazak Mills|N
01|60051|2|1|Shopping for table has Mazak Mills|N
01|60052|3|1|offered IMTS Promo 5 extra holders-Looking at package|N
01|60054|1|1|Sk Collet Systems|N
01|60055|1|1|Sk Collet Systems|N
01|60056|2|1|Showed Brian Torque Test very impressed with our sk|N
01|60056|2|2|and milling chuck. Also lieks the concept of the Xtreme|N
01|60056|2|3|Milling Chuck Brian would definitley be interested in|N
01|60056|2|4|test holders. Currently using Techniks MC and having|N
01|60056|2|5|issues.|N
01|60057|1|1|Problem with OCD MMC needs repair interested in|N
01|60057|1|2|zerofit and MDSK|N
01|60059|1|1|Has Mori Machines wants live tool|N
01|60060|1|1|Problem with OCD MMC needs repair interested in|N
01|60060|1|2|zerofit and MDSK|N
01|60061|2|1|Showed Brian Torque Test very impressed with our sk|N
01|60061|2|2|and milling chuck. Also lieks the concept of the Xtreme|N
01|60061|2|3|Milling Chuck Brian would definitley be interested in|N
01|60061|2|4|test holders. Currently using Techniks MC and having|N
01|60061|2|5|issues.|N
01|60063|2|1|Mazak-LT SK collets as well.|N
01|60064|2|1|Mazak-LT SK collets as well.|N
01|60067|2|1|Kitamura-CNC180FA-M and CNC180-AA21 QUOTE BOTH|N
01|60068|2|1|Kitamura-CNC180FA-M and CNC180-AA21 QUOTE BOTH|N
01|60070|2|1|Needs to order coolant nozzles|N
01|60071|2|1|Needs to order coolant nozzles|N
01|60072|4|1|NLX-2500 MORI|N
01|60073|2|1|Interested in Automation getting new Mori Lathe w/|N
01|60073|2|2|Live Tools.|N
01|60074|4|1|NLX-2500 MORI|N
01|60075|2|1|Interested in Automation getting new Mori Lathe w/|N
01|60075|2|2|Live Tools.|N
01|60078|1|1|Philip just wants a toolong system catalog|N
01|60083|1|1|-LOOKING AT BUYING LIVE TOOL|Y
01|60083|1|2|-SK LIVE TOOS INQUIRY|Y
01|60084|1|1|Looking for Paws Type workholding has Haas table|N
01|60084|1|2|will need better in future|N
01|60085|1|1|Looking for Paws Type workholding has Haas table|N
01|60085|1|2|will need better in future|N
01|60086|1|1|-LOOKING AT BUYING LIVE TOOL|Y
01|60086|1|2|-SK LIVE TOOS INQUIRY|Y
01|60087|1|1|iNQ-SK-ER Did a shrink fit demo and a torque test|N
01|60087|1|2|very interested in sk tool pk. send picture of plug|N
01|60087|1|3|on shrink fit unit|N
01|60088|1|1|iNQ-SK-ER Did a shrink fit demo and a torque test|N
01|60088|1|2|very interested in sk tool pk. send picture of plug|N
01|60088|1|3|on shrink fit unit|N
01|60089|1|1|Making rotary 5axis 5ax-100-130|N
01|60089|1|2|setup meeting in next 2 weeks/tooling solution|N
01|60090|1|1|Making rotary 5axis 5ax-100-130|N
01|60090|1|2|setup meeting in next 2 weeks/tooling solution|N
01|60091|1|1|Haas Mazak SQT18 wants Static 1 BB double in line if|N
01|60091|1|2|we have quote price|N
01|60092|1|1|Chris to follow up for donation|N
01|60093|1|1|Chris to follow up for donation|N
01|60095|1|1|METRAL AIR GAP SENSORS|Y
01|60098|1|1|METRAL AIR GAP SENSORS|Y
01|60099|2|1|Sk LT Jason from Toolcrib to see|N
01|60100|1|1|Slim chuck interest for sub spindle|N
01|60101|2|1|TOOLING UP A MACHINE AND HIGH SPEED|Y
01|60102|1|1|Send Rotary Table Catalog & Salesmen contact info via|N
01|60102|1|2|mail & electronic.|N
01|60102|1|3|Concept Planning-no visit until representative is|N
01|60102|1|4|called|N
01|60103|2|1|Sk LT Jason from Toolcrib to see|N
01|60104|2|1|TOOLING UP A MACHINE AND HIGH SPEED|Y
01|60105|1|1|Slim chuck interest for sub spindle|N
01|60106|1|1|Interested in Live and Static tooling. Live tool|N
01|60106|1|2|core buyback.|N
01|60108|1|1|Send Rotary Table Catalog & Salesmen contact info via|N
01|60108|1|2|mail & electronic.|N
01|60108|1|3|Concept Planning-no visit until representative is|N
01|60108|1|4|called|N
01|60110|1|1|5ax201 fam Dura Vertical with install please send|N
01|60110|1|2|photos from own cloud|N
01|60111|1|1|5ax201 fam Dura Vertical with install please send|N
01|60111|1|2|photos from own cloud|N
01|60112|1|1|HSK50 Anglehead 45 degree angle chirone vmc|N
01|60113|1|1|HSK50 Anglehead 45 degree angle chirone vmc|N
01|60114|1|1|Wants to put trunnion kit on his koma table|N
01|60114|1|2|MP Power kit as well as metrol air gap sensors|N
01|60115|1|1|Wants to put trunnion kit on his koma table|N
01|60115|1|2|MP Power kit as well as metrol air gap sensors|N
01|60116|1|1|Interested in Live and Static tooling. Live tool|N
01|60116|1|2|core buyback.|N
01|60117|1|1|Already got rotary table looking for another down|N
01|60117|1|2|the road|N
01|60119|1|1|Already got rotary table looking for another down|N
01|60119|1|2|the road|N
01|60122|2|1|torque test performed sk vs.er-torque wrench/attachment|N
01|60123|1|1|Looking to buy 5ax130 for a 3yr haas machine vertical|N
01|60123|1|2|comparing as to a haas rotary corey stevens get quote|N
01|60125|1|1|Looking to buy 5ax130 for a 3yr haas machine vertical|N
01|60125|1|2|comparing as to a haas rotary corey stevens get quote|N
01|60128|2|1|torque test performed sk vs.er-torque wrench/attachment|N
01|60131|5|1|Extreme Milling Chuck Literature and offerings|N
01|60136|5|1|Extreme Milling Chuck Literature and offerings|N
01|60137|3|1|Performed Shrink Deom for Rob and Alex. They are|N
01|60137|3|2|currently on the edge of shrink fit. Currently using|N
01|60137|3|3|a blow torch to utilize long reach extentions.|N
01|60138|3|1|Performed Shrink Deom for Rob and Alex. They are|N
01|60138|3|2|currently on the edge of shrink fit. Currently using|N
01|60138|3|3|a blow torch to utilize long reach extentions.|N
01|60139|3|1|Interested in LT BMT for mori and SK LT|N
01|60141|3|1|Interested in LT BMT for mori and SK LT|N
01|60142|2|1|Only utilizing this for contact purposes use QFA for|N
01|60142|2|2|distb.|N
01|60144|2|1|Only utilizing this for contact purposes use QFA for|N
01|60144|2|2|distb.|N
01|60146|1|1|Currently use our rotary tables on M560 Okuma's|N
01|60146|1|2|Possibly interested in a OO table for some medical|N
01|60146|1|3|projects.|N
01|60148|1|1|Needs to replace renishaw tool setter because it was|N
01|60148|1|2|broken using Mazak machine|N
01|60149|2|1|Has CNC202 on Miyano.Interest in another show him prom|N
01|60149|2|2|(CNC180AAZ)Quote hime table w/o motor & controlller|N
01|60149|2|3|Quote CNC180 w/o  motor & AAz1|N
01|60150|2|1|Want trunnion kit for 260 fanuc DDRT need to quote|N
01|60150|2|2|through Maruka offer following:|N
01|60150|2|3|260 size trunnion kit TAT-105 sub plate+ riser|N
01|60150|2|4|(Customer to suppli size when follow up)|N
01|60152|2|1|Want trunnion kit for 260 fanuc DDRT need to quote|N
01|60152|2|2|through Maruka offer following:|N
01|60152|2|3|260 size trunnion kit TAT-105 sub plate+ riser|N
01|60152|2|4|(Customer to suppli size when follow up)|N
01|60153|1|1|Looking at 5AXIS 250 size-350 size|N
01|60154|7|1|IMTS PROMO|Y
01|60154|8|1|IMTS PROMO    EXPIRES 12/31|N
01|60158|3|1|Showed Jon torque test. Very impressed with SK. Will be|N
01|60158|3|2|buying some in the future.|N
01|60159|3|1|Showed Jon torque test. Very impressed with SK. Will be|N
01|60159|3|2|buying some in the future.|N
01|60161|3|1|Pricing on 5AX-350. Cornfat Customer|N
01|60163|3|1|Pricing on 5AX-350. Cornfat Customer|N
01|60164|1|1|CAME TO SE MR. NAHAGAMA|Y
01|60164|1|2|BUT COULD NOT SEE HIM DUE TO SCHEDULE CONFLICT|Y
01|60164|1|3|HAVE USA OFFICE IN SCHAMBURG SERVICE OF USA INTERESTED|Y
01|60166|1|1|Hurco OEM  5ax201 / 5ax/ 30|N
01|60167|1|1|CAME TO SE MR. NAHAGAMA|Y
01|60167|1|2|BUT COULD NOT SEE HIM DUE TO SCHEDULE CONFLICT|Y
01|60167|1|3|HAVE USA OFFICE IN SCHAMBURG SERVICE OF USA INTERESTED|Y
01|60168|6|1|Showed Mark Metrol Prob & Qucik Change Flex Collets.|N
01|60168|6|2|Jim Fox Rotary table|N
01|60172|1|1|JUST RECEIVED NAKAMURA TW-300|Y
01|60172|1|2|NEED LIVE TOOL SEND CATALOG ASAP|Y
01|60173|1|1|JUST RECEIVED NAKAMURA TW-300|Y
01|60173|1|2|NEED LIVE TOOL SEND CATALOG ASAP|Y
01|60174|1|1|Uses SK6 Die&Molds. Cuts steel. Torque test very|N
01|60174|1|2|impressed. Local in Illinois. Sean set-up programmer|N
01|60174|1|3|Robert Aka Bob - Owner Matt - Owner son|N
01|60177|6|1|Showed Mark Metrol Prob & Qucik Change Flex Collets.|N
01|60177|6|2|Jim Fox Rotary table|N
01|60178|1|1|Looking for having our service deparment to|N
01|60178|1|2|RFID+ balance our existing toolholders that they own|N
01|60178|1|3|300 tool magazine|N
01|60179|1|1|Has Mazak QTN450M.|N
01|60179|1|2|Has Cat 40 Live Tooling|N
01|60179|1|3|Need adapted for draw bolt. Please contact|N
01|60179|1|4|Bought machine at auction|N
01|60180|1|1|MAY NEED HSK63A ANGLEHEAD TO REPALCE OLD STYLE LOCKED|Y
01|60180|1|2|AT FIXED|Y
01|60181|1|1|MAY NEED HSK63A ANGLEHEAD TO REPALCE OLD STYLE LOCKED|Y
01|60181|1|2|AT FIXED|Y
01|60182|2|1|Robodrill methods 5axis 250 size direct drive need now|N
01|60183|1|1|Part Number: OKU-LB-EXMW-SET|Y
01|60184|2|1|Robodrill methods 5axis 250 size direct drive need now|N
01|60185|1|1|THERI CUSTOMER IS MAKING AR15 PARTS (BOLT CARRIER)|Y
01|60185|1|2|-NEED 4AXIS TWIN SPINDLE WITH QUICK CHANGE FLEX|Y
01|60185|1|3|CHUCK AND COLLETS 42$65|Y
01|60187|3|1|Performed torque test cust impressed. Getting NEW|N
01|60187|3|2|holders for existing machine soon. Also may be|N
01|60187|3|3|interested in probe.|N
01|60190|2|1|Has CNC202 on Miyano.Interest in another show him prom|N
01|60190|2|2|(CNC180AAZ)Quote hime table w/o motor & controlller|N
01|60190|2|3|Quote CNC180 w/o  motor & AAz1|N
01|60191|1|1|THERI CUSTOMER IS MAKING AR15 PARTS (BOLT CARRIER)|Y
01|60191|1|2|-NEED 4AXIS TWIN SPINDLE WITH QUICK CHANGE FLEX|Y
01|60191|1|3|CHUCK AND COLLETS 42$65|Y
01|60192|3|1|Performed torque test cust impressed. Getting NEW|N
01|60192|3|2|holders for existing machine soon. Also may be|N
01|60192|3|3|interested in probe.|N
01|60193|1|1|Has CAT40 Haas VF3 5 parts DNH on both and show|N
01|60193|1|2|modular twin output. Should call|N
01|60195|6|1|Cust looking for anglehead. Spoke about modular system|N
01|60195|6|2|Seemed to like the flexibility. ER offset seemed most|N
01|60195|6|3|logical for application.|N
01|60196|1|1|Please send flyers for rotary work holdings|N
01|60196|1|2|Trunion - Tecma Vises|N
01|60197|2|1|We did TT|N
01|60198|6|1|Cust looking for anglehead. Spoke about modular system|N
01|60198|6|2|Seemed to like the flexibility. ER offset seemed most|N
01|60198|6|3|logical for application.|N
01|60199|3|1|Showed Evan & Jarrett the torque test.Seemed very|N
01|60199|3|2|impressed by the SK.Loved the ER/SK compression video|N
01|60201|3|1|Dont send catalogs performed TT Brian seems impressed|N
01|60202|4|1|Needs more catalogs for VC & SK. Interested in Metrol|N
01|60202|4|2|probe.|N
01|60203|3|1|Showed Evan & Jarrett the torque test.Seemed very|N
01|60203|3|2|impressed by the SK.Loved the ER/SK compression video|N
01|60204|1|1|P/N: 133778 (Radial)|Y
01|60204|2|1|P/N: 133741 (Axial)|Y
01|60205|1|1|Various interested in: LT Static standard advanced|N
01|60205|1|2|She is the buyer for sandvick sweden|N
01|60205|1|3|Interested in learning more about our products lines|N
01|60205|1|4|Looking at options to buy for their machines|N
01|60206|4|1|Needs more catalogs for VC & SK. Interested in Metrol|N
01|60206|4|2|probe.|N
01|60208|3|1|Has 15yr old Nikken table on Mazak setting new machine|N
01|60208|3|2|considering moving old table to new Fanuc controlled|N
01|60208|3|3|machine|N
01|60209|3|1|Has 15yr old Nikken table on Mazak setting new machine|N
01|60209|3|2|considering moving old table to new Fanuc controlled|N
01|60209|3|3|machine|N
01|60210|1|1|AC5-ABSB101-522LO-1inch Square shank turning tool|Y
01|60210|1|2|Quoted at a net price|Y
01|60214|1|1|Show torque test-impressed looking to buy lots of|N
01|60214|1|2|holders for existing mazak m/c's.Can call number|N
01|60214|1|3|written on receipt to mkae appt for follow up|N
01|60214|1|4|Has a/b 40 cncs send big blue & ret knob promo|N
01|60217|1|1|New Okuma VMC  Has Live Tool|N
01|60218|3|2|interested in 10 degree fixed live tool|N
01|60219|3|2|interested in 10 degree fixed live tool|N
01|60223|1|1|In need of NSK Attachment|N
01|60224|1|1|CNC 180 2w 350-Dual RT 12 from center to center|N
01|60224|1|2|Okuma M560|N
01|60225|1|1|Accessories included in price: Shrink unit Cooling|Y
01|60225|1|2|Unit 5-pc Induction Ring Set 5-pc  Cooling Bracket|Y
01|60225|1|3|Set Storage Racks & Chuck Holders|Y
01|60227|2|1|Has our 5AX on Makino S56Looking for high precision|N
01|60227|2|2|long reach tool holders NOW!!!|N
01|60227|3|1|For Makino|N
01|60228|2|1|Has our 5AX on Makino S56Looking for high precision|N
01|60228|2|2|long reach tool holders NOW!!!|N
01|60228|3|1|For Makino|N
01|60229|1|1|CNC 180 2w 350-Dual RT 12 from center to center|N
01|60229|1|2|Okuma M560|N
01|60230|2|1|David said his company needs to transform into using|N
01|60230|2|2|rotart table with trunnion to complete secondary|N
01|60230|2|3|operations on their production jobs|N
01|60231|2|1|David said his company needs to transform into using|N
01|60231|2|2|rotart table with trunnion to complete secondary|N
01|60231|2|3|operations on their production jobs|N
01|60233|1|1|CNC2 180L-SABL OR TCS2B|N
01|60240|1|1|set of 2 rot. tables including: sheet metal divider|Y
01|60240|1|2|cables and amp.|Y
01|60241|2|1|Needs Milling chucks/Has techniks shrinkfit tooling|N
01|60241|2|2|wants to try hydraulic to avoid vibration|N
01|60242|1|1|Quotes w/LNM but no discount at all.They have compared|N
01|60242|1|2|w/PTS prices and they are cheaper even considering|N
01|60242|1|3|Freight/customers to define our price policy to protect|N
01|60242|1|4|existing distrubtors but not lose oppurnities|N
01|60244|1|1|5C HEX METRIC COLLETS AND ACCES.|N
01|60245|2|1|Needs Milling chucks/Has techniks shrinkfit tooling|N
01|60245|2|2|wants to try hydraulic to avoid vibration|N
01|60247|1|1|5C HEX METRIC COLLETS AND ACCES.|N
01|60248|1|1|mORI 1.1/2 BORING BAR HOLDER WITH BACKING PLATE|N
01|60248|1|2|COOLANT THROUGH CAN WE MAKE THIS? ALREADY BUYS OUR|N
01|60248|1|3|TOOLING|N
01|60249|2|1|90 degree RAH-Spindle Speeded|N
01|60250|2|1|90 degree RAH-Spindle Speeded|N
01|60252|2|1|Bring out A-1 5C closer to test in TAT-105|N
01|60253|2|1|Bring out A-1 5C closer to test in TAT-105|N
01|60255|2|1|Wants SK live toolinggave torque test.Was very|N
01|60255|2|2|impressed with our tooling.Wantstool certs & live tool|N
01|60255|2|3|core buyback|N
01|60256|1|1|mORI 1.1/2 BORING BAR HOLDER WITH BACKING PLATE|N
01|60256|1|2|COOLANT THROUGH CAN WE MAKE THIS? ALREADY BUYS OUR|N
01|60256|1|3|TOOLING|N
01|60257|1|1|Upgrade to CNC260 this machine is 50taper. Looking to|N
01|60257|1|2|purchase CNC180 for MV-653-mori.Quick change in power|N
01|60257|1|3|fixture was also discussed.customer very interested. I|N
01|60257|1|4|think this will be a great promo to offer if they|N
01|60257|1|5|purchase a RT. The custome would like any RT purchase|N
01|60257|1|6|to be driven by the A21 controlling  so please do not|N
01|60257|1|7|emphasie the point of interfacing.|N
01|60258|2|1|Wants SK live toolinggave torque test.Was very|N
01|60258|2|2|impressed with our tooling.Wantstool certs & live tool|N
01|60258|2|3|core buyback|N
01|60259|1|1|Give to Bob--Discussed qcfc system 2 free collets with|N
01|60259|1|2|purchase also BMT55 and BMT45|N
01|60259|1|3|customer has old eppinger live tools to trade in|N
01|60259|1|4|give to jaek@afi|N
01|60260|1|1|Give to Bob--Discussed qcfc system 2 free collets with|N
01|60260|1|2|purchase also BMT55 and BMT45|N
01|60260|1|3|customer has old eppinger live tools to trade in|N
01|60260|1|4|give to jaek@afi|N
01|60262|1|1|Marc uses some of our products currently interested|N
01|60262|1|2|in a new catalog|N
01|60264|1|1|Marc uses some of our products currently interested|N
01|60264|1|2|in a new catalog|N
01|60265|1|1|Inq-SK-Tap|N
01|60265|1|2|Rich currently uses tap holders. He pllans on using|N
01|60265|1|3|pipe tap collets or sk holders|N
01|60266|1|1|Inq-SK-Tap|N
01|60266|1|2|Rich currently uses tap holders. He pllans on using|N
01|60266|1|3|pipe tap collets or sk holders|N
01|60268|3|1|BT30 stubby ER20 reccessed nut|N
01|60269|2|1|c40ram-er11-208st-65tp c40ram-er20-225-st65|N
01|60269|2|2|c40-ram mram-er16 mram-er16st|N
01|60270|2|1|Looking at ENG solution for 2 or 4 axis spindle 4th|N
01|60270|2|2|axis possibly new install parts range in length from|N
01|60270|2|3|6 inches to 1 meter|N
01|60271|1|1|Milling chuck|N
01|60272|3|1|BT30 stubby ER20 reccessed nut|N
01|60273|1|1|Milling chuck|N
01|60274|2|1|Looking at ENG solution for 2 or 4 axis spindle 4th|N
01|60274|2|2|axis possibly new install parts range in length from|N
01|60274|2|3|6 inches to 1 meter|N
01|60276|3|1|Spoke with Berry about our milling chuck & sk. Showed|N
01|60276|3|2|the torque test cut video of er vs sk. Berry interested|N
01|60278|3|1|Spoke with Berry about our milling chuck & sk. Showed|N
01|60278|3|2|the torque test cut video of er vs sk. Berry interested|N
01|60281|4|1|Tap Collets Sealed|N
01|60282|4|1|Tap Collets Sealed|N
01|60287|1|1|Tail support table with brake.|Y
01|60291|2|1|UDS-2 With Precision Casting Base|Y
01|60294|1|1|Table with motors and hydraulic braking.|Y
01|60294|2|1|Air/Hydraulic booster for table brake system.|Y
01|60294|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|60294|3|2|external cable set communication cable fiber optic|Y
01|60294|3|3|cable parameter changes travel and labor for|Y
01|60294|3|4|installing one rotary table on one Doosan DNM750.|Y
01|60295|2|1|1/2 Endmill. HRC40 Hardmilling.Okuma Genos MB560 new|N
01|60295|2|2|moldmaking Big Plus spindle machine due in 2 weeks|N
01|60299|4|1|NAKAMURA CATALOG|Y
01|60300|2|1|1/2 Endmill. HRC40 Hardmilling.Okuma Genos MB560 new|N
01|60300|2|2|moldmaking Big Plus spindle machine due in 2 weeks|N
01|60301|4|1|NAKAMURA CATALOG|Y
01|60302|4|1|Allen is interested in a tooling catalog.Currently|N
01|60302|4|2|uses some Lyndex product|N
01|60303|4|1|Allen is interested in a tooling catalog.Currently|N
01|60303|4|2|uses some Lyndex product|N
01|60304|2|1|x2 90 degree RAH|N
01|60306|2|1|x2 90 degree RAH|N
01|60307|1|1|COMPRARON MAQUINA DOBLE CLUMNA CAT50/INTERMAQ|Y
01|60307|1|2|BUSCAN LT OKUMA VDI30 PARA SUJETAR HOLDERS|Y
01|60310|1|1|NST250 NST250-HP 4 MAZAK|N
01|60311|1|1|COMPRARON MAQUINA DOBLE CLUMNA CAT50/INTERMAQ|Y
01|60311|1|2|BUSCAN LT OKUMA VDI30 PARA SUJETAR HOLDERS|Y
01|60313|1|1|NST250 NST250-HP 4 MAZAK|N
01|60315|2|1|Uses come of our collets wanted some literature|N
01|60316|1|1|ENVIAR CATALOGO PRENSAS FRESMAK|Y
01|60317|1|1|ENVIAR CATALOGO PRENSAS FRESMAK|Y
01|60319|1|1|Arrange in introduction of fixture shop to tokyo sangyo|N
01|60319|1|2|Ohio Indiana Kentucky Michigan Illinois area|N
01|60320|2|1|Interested in a 20 chuck for his lathe. Call Warren|N
01|60320|2|2|for details.|N
01|60321|2|1|Interested in a 20 chuck for his lathe. Call Warren|N
01|60321|2|2|for details.|N
01|60323|2|1|PLEASE SEND BOTH MAZAK CATALOGS|Y
01|60324|1|1|Quoted at a net price|Y
01|60325|2|1|PLEASE SEND BOTH MAZAK CATALOGS|Y
01|60327|2|1|Currently has Okuma LB3000 and Captain L-370. Shared|N
01|60327|2|2|live tool program with Dijai|N
01|60329|2|1|Currently has Okuma LB3000 and Captain L-370. Shared|N
01|60329|2|2|live tool program with Dijai|N
01|60330|2|1|Uses come of our collets wanted some literature|N
01|60331|2|1|HSK100A SF4|N
01|60332|2|1|HSK100A SF4|N
01|60334|2|1|Needs catalog|N
01|60335|2|1|Needs catalog|N
01|60336|1|1|Interested in live tools|N
01|60336|1|2|Particularly SK Automotive|N
01|60337|1|1|Interested in live tools|N
01|60337|1|2|Particularly SK Automotive|N
01|60338|1|1|Joe the toolroom supervisor gave me his cell # and|N
01|60338|1|2|would like me to stop by and discuss some solutions|N
01|60339|1|1|Reference RGA# TOR-48588|Y
01|60339|1|2|Repair/replacement declined. Inspection fee of $50.00|Y
01|60339|1|3|net each has been assessed for the following:|Y
01|60339|1|4|13x CAT40-MMC8C-125U-A|Y
01|60339|1|5|3x CAT40-MMC8C-120U|Y
01|60340|1|1|Joe the toolroom supervisor gave me his cell # and|N
01|60340|1|2|would like me to stop by and discuss some solutions|N
01|60341|1|1|Twin output livetools for sudder turret on Hyundai|N
01|60341|1|2|Wia SKT210SY|N
01|60342|1|1|Rotary Table CNC180 Visit|N
01|60343|1|1|Rotary Table CNC180 Visit|N
01|60344|2|1|Shrink Demo Performed|N
01|60344|4|1|Looking to replace old speeder|N
01|60345|2|1|Shrink Demo Performed|N
01|60345|4|1|Looking to replace old speeder|N
01|60347|1|1|Buying HSK80F Makino Mag 1. buying Mazak QTN|N
01|60347|1|2|quoting packages through ATS send MC charger and swag|N
01|60349|1|1|Buying HSK80F Makino Mag 1. buying Mazak QTN|N
01|60349|1|2|quoting packages through ATS send MC charger and swag|N
01|60353|3|1|Using milling chuck now good account to grow SK|N
01|60353|3|2|SK business. Talked about MDSK and zero fit|N
01|60355|3|1|Using milling chuck now good account to grow SK|N
01|60355|3|2|SK business. Talked about MDSK and zero fit|N
01|60357|1|1|Looking for Zero fit holders|N
01|60358|1|1|Looking for Zero fit holders|N
01|60359|3|1|Charles viewed torque test.Looking into precision|N
01|60359|3|2|systems|N
01|60360|1|1|Windsor Canada Ontario CNC2000 CALL!!|N
01|60361|1|1|Windsor Canada Ontario CNC2000 CALL!!|N
01|60362|3|1|Charles viewed torque test.Looking into precision|N
01|60362|3|2|systems|N
01|60365|6|1|Introduciton-Table Purchase 1st quarter|N
01|60366|1|1|lOOKING FOR 4TH AND 5TH MACHINE|N
01|60367|2|1|Possible table businesssend catalog|N
01|60367|3|1|Please send generic informatiopn|N
01|60368|6|1|Introduciton-Table Purchase 1st quarter|N
01|60369|1|1|lOOKING FOR 4TH AND 5TH MACHINE|N
01|60370|1|1|Perfect price point very interested|N
01|60372|8|1|Item is shown as YOUR NET COST. No further discount|Y
01|60372|8|2|will be given off this item.|Y
01|60372|9|1|Item is shown as YOUR NET COST. No further discount|Y
01|60372|9|2|will be given off this item.|Y
01|60372|16|1|Item is shown as YOUR NET COST. No further discount|Y
01|60372|16|2|will be given off this item.|Y
01|60372|27|1|Item is shown as YOUR NET COST. No further discount|Y
01|60372|27|2|will be given off this item.|Y
01|60372|35|1|Item is shown as YOUR NET COST. No further discount|Y
01|60372|35|2|will be given off this item.|Y
01|60372|36|1|Item is shown as YOUR NET COST. No further discount|Y
01|60372|36|2|will be given off this item.|Y
01|60372|97|1|This item is given in terms of NET price|N
01|60372|98|1|This item is given in terms of NET price|N
01|60372|103|1|Item is shown as YOUR NET COST. No further discount|Y
01|60372|103|2|will be given off this item.|Y
01|60372|104|1|Item is shown as YOUR NET COST. No further discount|Y
01|60372|104|2|will be given off this item.|Y
01|60373|1|1|Perfect price point very interested|N
01|60374|2|1|Possible table businesssend catalog|N
01|60374|3|1|Please send generic informatiopn|N
01|60375|3|1|HSK buys from Precision Dave Trainer of MSC|N
01|60376|1|1|iNQ-SK|N
01|60376|1|2|Buys sk and needs more collets.|N
01|60377|3|1|We did TT and showed SK option for LT|N
01|60377|4|1|They requiere some ER25 collets info|N
01|60377|6|1|Please quote:|N
01|60377|6|2|BMT55-ER32X-ICE 2pc BMT55-ER32Z-ICE 1pc|N
01|60377|6|3|BMT55-SK20X-ICE 2pc BMT55-SK20Z-ICE 1pc|N
01|60377|6|4|Live tool for Doosan 210DY BMT55|N
01|60378|1|1|iNQ-SK|N
01|60378|1|2|Buys sk and needs more collets.|N
01|60379|3|1|HSK buys from Precision Dave Trainer of MSC|N
01|60380|1|1|Looking at Integration for Robot Debut|N
01|60381|2|1|would like to test cut with eco head|N
01|60382|1|1|Looking at Integration for Robot Debut|N
01|60383|3|1|We did TT and showed SK option for LT|N
01|60383|4|1|They requiere some ER25 collets info|N
01|60383|6|1|Please quote:|N
01|60383|6|2|BMT55-ER32X-ICE 2pc BMT55-ER32Z-ICE 1pc|N
01|60383|6|3|BMT55-SK20X-ICE 2pc BMT55-SK20Z-ICE 1pc|N
01|60383|6|4|Live tool for Doosan 210DY BMT55|N
01|60385|1|1|interested in nakamurua LT|N
01|60386|2|1|would like to test cut with eco head|N
01|60387|1|1|interested in nakamurua LT|N
01|60390|1|1|Per conversation with Nick mazis we are not sending|N
01|60390|1|2|catalogs they are our competitor|N
01|60391|8|1|Item is shown as YOUR NET COST. No further discount|Y
01|60391|8|2|will be given off this item.|Y
01|60391|9|1|Item is shown as YOUR NET COST. No further discount|Y
01|60391|9|2|will be given off this item.|Y
01|60391|16|1|Item is shown as YOUR NET COST. No further discount|Y
01|60391|16|2|will be given off this item.|Y
01|60391|27|1|Item is shown as YOUR NET COST. No further discount|Y
01|60391|27|2|will be given off this item.|Y
01|60391|35|1|Item is shown as YOUR NET COST. No further discount|Y
01|60391|35|2|will be given off this item.|Y
01|60391|36|1|Item is shown as YOUR NET COST. No further discount|Y
01|60391|36|2|will be given off this item.|Y
01|60391|97|1|This item is given in terms of NET price|N
01|60391|98|1|This item is given in terms of NET price|N
01|60391|103|1|Item is shown as YOUR NET COST. No further discount|Y
01|60391|103|2|will be given off this item.|Y
01|60391|104|1|Item is shown as YOUR NET COST. No further discount|Y
01|60391|104|2|will be given off this item.|Y
01|60393|2|1|Mori live tools with Alan Overfelt|N
01|60395|6|1|Looking for LT for Haas lathe ST-20Y|N
01|60395|6|2|CAT40 RAH/90 and universal|N
01|60396|6|1|Looking for LT for Haas lathe ST-20Y|N
01|60396|6|2|CAT40 RAH/90 and universal|N
01|60397|1|1|Interested on metrol|N
01|60399|2|1|If project is approved will buy one table at the end of|N
01|60399|2|2|2016 and second on first half of 2017|N
01|60399|2|3|We will handle this bussines until PO generation proces|N
01|60399|2|4|after then we will pass to presotec|N
01|60399|2|5|Send presentation of installation on Robodrill machines|N
01|60400|2|1|If project is approved will buy one table at the end of|N
01|60400|2|2|2016 and second on first half of 2017|N
01|60400|2|3|We will handle this bussines until PO generation proces|N
01|60400|2|4|after then we will pass to presotec|N
01|60400|2|5|Send presentation of installation on Robodrill machines|N
01|60402|2|1|Mori live tools with Alan Overfelt|N
01|60411|2|1|Promo price with the purchase of matching holder|Y
01|60415|2|1|One hole on side of part. reduce cycle time.|N
01|60417|2|1|One hole on side of part. reduce cycle time.|N
01|60418|1|1|Reference RGA# TAR-48661|Y
01|60418|1|2|CNC180OSP-M s/n: 17330|N
01|60421|1|1|Reference RGA# TAR-48711|Y
01|60421|1|2|5AX-350FA-R36 s/n: 3515|Y
01|60421|30|1|Freight for table shipped on USF Holland and charged|Y
01|60421|30|2|to Lyndex-Nikken in error.  Ok by Kristina to add|Y
01|60421|30|3|charge to repair quote.|Y
01|60421|32|1|Tilt Axis|Y
01|60421|34|1|Rotary Axis|Y
01|60421|35|1|Rotary Axis|Y
01|60424|1|1|Per conversation with Nick M we are not sending them|N
01|60424|1|2|catalogs they are our competitor|N
01|60425|1|1|r2800 4+1 5axis with pnuematic rotary joint|N
01|60426|1|1|r2800 4+1 5axis with pnuematic rotary joint|N
01|60433|1|1|Table with HAAS motors and cables - AIR BRAKE|Y
01|60433|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|60433|2|2|holders. Thank you for your rotary table purchase.|Y
01|60439|4|1|Interested in the Slim Type QCFC chuck for sub spindle|N
01|60439|4|2|work on a Nakamura machine.|N
01|60441|4|1|Interested in the Slim Type QCFC chuck for sub spindle|N
01|60441|4|2|work on a Nakamura machine.|N
01|60442|3|1|Saw torque tests impressed uses HPI. Has OKK taper|N
01|60442|3|2|plus machine.|N
01|60443|3|1|Saw torque tests impressed uses HPI. Has OKK taper|N
01|60443|3|2|plus machine.|N
01|60445|2|1|Small Taper Tooling|N
01|60446|2|1|Small Taper Tooling|N
01|60447|4|1|Haas VF-3 table CNC180|N
01|60448|4|1|Haas VF-3 table CNC180|N
01|60450|3|1|Want to see what we have|N
01|60451|3|1|Want to see what we have|N
01|60452|1|1|High Speed table with motor and hydraulic brake.|Y
01|60452|1|2|Table to be laid on it's back.|Y
01|60452|2|1|Air/Hydraulic Booster for table brake system.|Y
01|60452|2|2|Table to be laid on it's back.|Y
01|60452|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|60452|3|2|external cable set communication cable fiber optic|Y
01|60452|3|3|cable parameter changes travel and service labor for|Y
01|60452|3|4|installing one rotary table on one Doosan DNM750 VMC.|Y
01|60454|1|1|Table with Fanuc motors and hydraulic brakes.|Y
01|60454|2|1|500PSI tank and unit for table braking systems.|Y
01|60454|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|60454|3|2|external cable sets communication cable fiber optic|Y
01|60454|3|3|cable parameter changes travel and labor for|Y
01|60454|3|4|installing one tilt rotary table on one Doosan DNM750|Y
01|60454|3|5|VMC.|Y
01|60456|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|60471|1|1|Reference RGA# TOR-48763|Y
01|60471|1|2|CAT50-NPU13-90U|N
01|60480|1|1|Nakamura Tone Flyer send one please|N
01|60480|1|2|Interested in the eltimon for their live tools|N
01|60480|1|3|smaller shop but looking to expland and improve|N
01|60481|7|1|The above holder is DIN & High Speed|Y
01|60483|1|1|Nakamura Tone Flyer send one please|N
01|60483|1|2|Interested in the eltimon for their live tools|N
01|60483|1|3|smaller shop but looking to expland and improve|N
01|60484|1|1|5AX TO REPLACE EXISTING 4TH IN THE MARKET FOR A|N
01|60484|1|2|5TH AXIS TABLE HAS HAAS 4TH AXIS THAT|N
01|60484|1|3|HE IS NOT HAPPY WITH|N
01|60485|1|1|5AX TO REPLACE EXISTING 4TH IN THE MARKET FOR A|N
01|60485|1|2|5TH AXIS TABLE HAS HAAS 4TH AXIS THAT|N
01|60485|1|3|HE IS NOT HAPPY WITH|N
01|60486|1|1|T91|Y
01|60486|2|1|T91|Y
01|60486|3|1|T91|Y
01|60486|4|1|T91|Y
01|60486|5|1|T91|Y
01|60486|6|1|T91|Y
01|60486|8|1|T109|Y
01|60486|9|1|T109|Y
01|60486|11|1|T112|Y
01|60486|12|1|T112|Y
01|60486|14|1|T113|Y
01|60486|15|1|T113|Y
01|60486|17|1|T115|Y
01|60486|18|1|T115|Y
01|60486|20|1|T120|Y
01|60486|21|1|T120|Y
01|60486|22|1|T120|Y
01|60486|24|1|T123|Y
01|60486|25|1|T123|Y
01|60486|26|1|T123|Y
01|60486|28|1|T124|Y
01|60486|29|1|T124|Y
01|60486|30|1|124|Y
01|60486|32|1|T126|Y
01|60486|33|1|T126|Y
01|60486|35|1|T127|Y
01|60486|36|1|T127|Y
01|60486|38|1|T145|Y
01|60486|39|1|T145|Y
01|60486|40|1|T145|Y
01|60486|42|1|T151|Y
01|60486|43|1|T151|Y
01|60486|45|1|T153|Y
01|60486|47|1|T16|Y
01|60486|49|1|T163|Y
01|60486|50|1|T163|Y
01|60486|52|1|T185|Y
01|60486|53|1|T185|Y
01|60486|54|1|T185|Y
01|60486|56|1|T19|Y
01|60486|57|1|T19|Y
01|60486|59|1|T199|Y
01|60486|60|1|T199|Y
01|60486|62|1|T211|Y
01|60486|63|1|T211|Y
01|60486|65|1|T216|Y
01|60486|66|1|T216|Y
01|60486|71|1|T221|Y
01|60486|72|1|T221|Y
01|60486|74|1|T227|Y
01|60486|75|1|T227|Y
01|60486|77|1|T26|Y
01|60486|78|1|T26|Y
01|60486|80|1|T27|Y
01|60486|81|1|T27|Y
01|60486|83|1|T270|Y
01|60486|84|1|T270|Y
01|60486|86|1|T275|Y
01|60486|87|1|T275|Y
01|60486|89|1|T32|Y
01|60486|90|1|T32|Y
01|60486|92|1|T34|Y
01|60486|93|1|T34|Y
01|60486|94|1|T34|Y
01|60486|96|1|T43|Y
01|60486|97|1|T43|Y
01|60486|98|1|T43|Y
01|60486|100|1|T46|Y
01|60486|101|1|T46|Y
01|60486|102|1|T46|Y
01|60486|103|1|T46|Y
01|60486|104|1|T46|Y
01|60486|106|1|T57|Y
01|60486|107|1|T57|Y
01|60486|108|1|T57|Y
01|60486|110|1|T63|Y
01|60486|111|1|T63|Y
01|60486|112|1|T63|Y
01|60486|113|1|T63|Y
01|60486|115|1|T64|Y
01|60486|116|1|T64|Y
01|60486|118|1|T72|Y
01|60486|119|1|T72|Y
01|60486|121|1|T75|Y
01|60486|122|1|T75|Y
01|60486|124|1|T76|Y
01|60486|125|1|T76|Y
01|60486|126|1|T76|Y
01|60486|127|1|T76|Y
01|60486|129|1|T78|Y
01|60486|130|1|T78|Y
01|60486|131|1|T78|Y
01|60486|132|1|T78|Y
01|60486|134|1|T80|Y
01|60486|135|1|T80|Y
01|60486|136|1|T80|Y
01|60486|138|1|T87|Y
01|60486|139|1|T87|Y
01|60486|141|1|T92|Y
01|60487|1|1|Live Tooling high interest in trade in other intert|N
01|60487|1|2|in UDI wants to see more on SK live tooling LB400/470|N
01|60488|1|1|Live Tooling high interest in trade in other intert|N
01|60488|1|2|in UDI wants to see more on SK live tooling LB400/470|N
01|60489|1|1|Major dream xtremem milling chucks cat50 hsk100/63 cap8|N
01|60489|1|2|wants to move away from er20/25 currently uses sf and|N
01|60489|1|3|milling chuck aerospace landing gear 50+hr|N
01|60490|1|1|Major dream xtremem milling chucks cat50 hsk100/63 cap8|N
01|60490|1|2|wants to move away from er20/25 currently uses sf and|N
01|60490|1|3|milling chuck aerospace landing gear 50+hr|N
01|60491|1|1|General Tooling interest|N
01|60492|1|1|General Tooling interest|N
01|60493|1|1|Dist distributor in canada interested in representing|N
01|60493|1|2|our line sold lyndex but buys through sowa call to set|N
01|60493|1|3|up if we are to pursue|N
01|60495|1|1|Dist distributor in canada interested in representing|N
01|60495|1|2|our line sold lyndex but buys through sowa call to set|N
01|60495|1|3|up if we are to pursue|N
01|60496|1|1|Drawing is attached to email for your reference.|Y
01|60498|1|1|Simon wants one of each catalog|N
01|60499|1|1|Simon wants one of each catalog|N
01|60501|1|1|Have been using sk101625 machine haas vmc750|N
01|60501|1|2|one of the sk10 crashed drill and collet do not come|N
01|60501|1|3|out can not turn loose wants engineer contact him for|N
01|60501|1|4|solution please contact him also interested in MMC info|N
01|60502|1|1|Have been using sk101625 machine haas vmc750|N
01|60502|1|2|one of the sk10 crashed drill and collet do not come|N
01|60502|1|3|out can not turn loose wants engineer contact him for|N
01|60502|1|4|solution please contact him also interested in MMC info|N
01|60514|3|1|Coolant Collector|Y
01|60517|1|1|2-5AX-2MT-105-120 tables with installation kit for the|Y
01|60517|1|2|Brother TC32BN.|Y
01|60529|1|1|Table with Fanuc motor and air brake.|Y
01|60529|2|1|8 Scroll Chuck & Adapter Plate for CNC202|Y
01|60529|3|1|OPTION #1 for tailstock|Y
01|60529|3|2|swing away design adjustable center dead only|Y
01|60529|4|1|OPTION #2 for tailstock|Y
01|60529|4|2|fixed design fixed center dead or live|Y
01|60529|5|1|Installation Includes: Drive amp bulkhead cable set|Y
01|60529|5|2|external cable set communication cable fiber optic|Y
01|60529|5|3|cable parameter changes travel and labor for|Y
01|60529|5|4|installing one rotary table on one Doosan VMC.|Y
01|60545|1|1|HFO TO SUPPLY MOTORS AND CABLES|Y
01|60545|1|2|DELIVERY 8 WEEKS ARO|Y
01|60569|3|1|Tilt axis worm screw assembly is pending.|Y
01|60578|4|1|500 PSI tank and unit for table brake systems.|Y
01|60578|5|1|Installation Includes: drive amp bulkhead cable set|Y
01|60578|5|2|external cable set communication cable fiber optic|Y
01|60578|5|3|cable parameter changes travel and labor for|Y
01|60578|5|4|installing one 5AX table on one YCM VMC - FANUC|Y
01|60589|1|1|This pricing includes the table with Haas motor along|Y
01|60589|1|2|with the angle plate to stand the table upright for|Y
01|60589|1|3|vertical use.|Y
01|60589|1|4|***Will have to have angle plate made and could add to|Y
01|60589|1|5|overall delivery.***|Y
01|60589|2|1|500PSI unit and tank for table braking system.|Y
01|60590|1|1|8 rotary table with M-Code control|Y
01|60594|1|1|Reference RGA# TOR-48788|Y
01|60594|1|2|#1 NCAT50-C3/4-105UG|N
01|60594|10|1|#2 NCAT50-C3/4-105UG|N
01|60607|1|1|Quoted at a net price|Y
01|60607|2|1|Quoted at a net price|Y
01|60607|3|1|5pc minimum order!|Y
01|60607|3|2|Quoted at a net price|Y
01|60607|4|1|5pc minimum order!|Y
01|60607|4|2|Quoted at a net price|Y
01|60608|1|1|Reference RGA# LVR-48700|Y
01|60608|1|2|Doosan Live Tool|N
01|60608|3|1|Bearings seals and o-rings are worn and must be|Y
01|60608|3|2|replaced. Labor is included.|Y
01|60616|1|1|Reference RGA# LVR-48731|Y
01|60616|1|2|OKL3-ER32X s/n: AL0156|N
01|60616|3|1|Spindle is damaged and must be replaced. Collet nut|Y
01|60616|3|2|bearings seals and o-rings must be replaced. Labor is|Y
01|60616|3|3|included.|Y
01|60629|1|1|Special demo table pricing.|Y
01|60630|1|1|HSK100A-MDSK20-140-J-IDU Major Dream SK20 with ID Chip|Y
01|60630|1|2|Hole Cut and Coolant Nut at factory. Rolls Royce to|Y
01|60630|1|3|install their ID chips themselves.|Y
01|60630|5|1|HSK100A-MDSK20-140-J Major Dream SK20 with Coolant Nut|Y
01|60630|5|2|installed prior to ship. No ID Chip hole cut.|Y
01|60645|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|60646|1|1|ER25 Z-Axis Main Spindle Output x 2 EXT Coolant|Y
01|60646|1|2|6500 RPM 15Nm per spindle90-Deg|Y
01|60646|2|1|ER25 Z-Axis Main Spindle Output x 2 EXT Coolant|Y
01|60646|2|2|6500 RPM 15Nm per spindle90-Deg|Y
01|60646|4|1|ER25 X-Axis Main Spindle Output x 2 EXT Coolant|Y
01|60646|4|2|6500 RPM 15Nm per spindle|Y
01|60646|5|1|ER25 X-Axis Main Spindle Output x 2 EXT Coolant|Y
01|60646|5|2|6500 RPM 15Nm per spindle|Y
01|60646|7|1|ER25 Y-Axis Main Spindle Output x 2 EXT Coolant|Y
01|60646|7|2|6500 RPM 15Nm per spindle|Y
01|60646|8|1|ER25 Y-Axis Main Spindle Output x 2 EXT Coolant|Y
01|60646|8|2|6500 RPM 15Nm per spindle|Y
01|60653|1|1|Seal Kit for H012M32 R-218|Y
01|60666|49|1|Dave Werblo|Y
01|60670|1|1|Table WITH Mits motors MA-M|Y
01|60670|2|1|500PSI tank and unit for table brake systems.|Y
01|60670|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|60670|3|2|external cable set communication cable fiber optic|Y
01|60670|3|3|cable parameter changes travel and labor for|Y
01|60670|3|4|installing one 5AX table on one DMG MORI NVX5080 VMC.|Y
01|60671|1|1|Complete with Sheet Metal/Junction Box/Amplifier|Y
01|60677|1|1|Pricing reflects NET charge each|Y
01|60691|5|1|1pc per matching taper holder purchased|Y
01|60696|4|1|Charge for DIN is figured into the holder pricing|Y
01|60745|1|1|Quoted as net price-non returnable.|Y
01|60748|4|1|D43GUX-NK8080|Y
01|60753|1|1|ITEM QUOTED IN NET PRICE|Y
01|60769|1|1|Install Includes: drive amp bulkhead cable set|Y
01|60769|1|2|external cable set communication cable fiber optic|Y
01|60769|1|3|cable parameter changes travel and labor for|Y
01|60769|1|4|installing one table on one Robodrill VMC.|Y
01|60777|1|1|Part #NBT40-FMA25.4-90|Y
01|60777|2|1|Part # NB4021-1000-5.00|Y
01|60781|1|1|7pcs Stock remaining bal ETA pending factory|N
01|60781|2|1|3pcs stock remaining bal ETA pending factory|N
01|60787|2|1|THIS ITEM FROM SLIGHTLY USED INVENTORY|Y
01|60806|1|1|CAT40-C20-90U  Milling Chuck 20mm|Y
01|60806|1|2|Quoted at a net price|Y
01|60808|1|1|Can be used to run internal external or no coolant|Y
01|60808|1|2|24/7 without being removed from the turret.|Y
01|60808|5|1|Can be used to run external coolant only.|Y
01|60808|8|1|Can be used to run internal external or no coolant|Y
01|60808|8|2|24/7 without being removed from the turret.|Y
01|60815|15|1|use with BT50-C32-120|Y
01|60825|1|1|4pcs ETA aprox 2 weeks remaining bal ETA aprox 5 weeks|Y
01|60828|1|1|Mimatic #173224 Tool Prestting Unit HSK100A|Y
01|60828|3|1|Mimatic #121491 Presetting Unit SK50|Y
01|60839|3|1|Price reflects net charge for DN modification|Y
01|60843|6|1|1 Milling Chuck w/ 135mm  (5.3149) gage length|Y
01|60843|6|2|uses same standard wrench|Y
01|60843|8|1|1.1/4 Milling Chuck w/ 105mm  (4.133) gage length|Y
01|60843|8|2|uses hi-speed wrench|Y
01|60864|3|1|Wrench for NCAT40-SK10C-90UP|Y
01|60864|11|1|Wrench for NCAT40-SK16C-120UP|Y
01|60888|1|1|Can be used to run external coolant only.|Y
01|60888|2|1|Can be used to run internal or external coolant.|Y
01|60889|1|1|Hard Balance customer's BT30 SMH w/ face mill|Y
01|60889|1|2|provided by SMC.|Y
01|60889|1|3|Hard balance assembly to 15000RPM|Y
01|60889|2|1|Hard Balance customer's BT40 SMH w/ face mill|Y
01|60889|2|2|provided by SMC.|Y
01|60889|2|3|Hard balance assembly to 15000RPM|Y
01|60889|3|1|Hard Balance customer's HSK63A SMH w/ face mills|Y
01|60889|3|2|provided by SMC.|Y
01|60889|3|3|Hard balance assembly to 20000RPM|Y
01|60889|3|4|*Reference Lyndex-Nikken RGA# MOD-48841|Y
01|60898|1|1|For TC32A - 1 pc long cable & drive unit included|Y
01|60904|1|1|Part # AC6-AXSB101-69390 Adapter for DMG Mori 4250DCG/|Y
01|60904|1|2|1500SZ|Y
01|60907|1|1|AC6-SHMP10-43 Capto6 Adapter for Renishaw OMP60|Y
01|60910|4|1|Blank positioning block at no charge as part of IMTS|Y
01|60910|4|2|promotion!|Y
01|60926|3|1|FREE with purchase of CAT40 Right Anglehead|Y
01|60942|5|1|E16-006 will be able to hold .078 or 5/64|Y
01|60953|5|1|INSTALLATION INCLUDES EXTERNAL CABLES FROM ROTARY TABLE|Y
01|60953|5|2|TO BULKHEAD. MACHINE HAS 4TH AXIS INTERFACE ALREADY|Y
01|60953|5|3|FOR ALPHA 8/3000i MOTOR. SCHEMATICS AND ELECTRICAL|Y
01|60953|5|4|INFORMATION NEEDED TO CONFIRM.|Y
01|60953|5|5|TABLE WILL HAVE SERVO MOTOR INTERNAL WIRE HARNESS|Y
01|60959|17|1|Quoted as alternative stock to E20-334(C)|Y
01|60963|2|1|Installation of Rotary Table into VMC.|Y
01|60963|2|2|VMC will have Mitsubishi M70 Controller.|Y
01|60963|2|3|Includes all travel expenses + installation of table.|Y
01|60963|2|4|Includes Hardware External + Interface Cables|Y
01|60963|2|5|Fiber Optic Cable Amplifier|Y
01|60965|20|1|Collet does not collapse|Y
01|60977|1|1|Reference RGA# LVR-48745|Y
01|60977|1|2|OK113-45000 s/n: A0005|N
01|60977|3|1|ER Spindle is cracked in several spots and must be|Y
01|60977|3|2|replaced. Bearings seals and o-rings are worn and must|Y
01|60977|3|3|be replaced. Collet nut must also be replaced. Labor is|Y
01|60977|3|4|included.|Y
01|60989|1|1|CAT50 EXTRA LENGTH RAH W/ SUPPORT PINS|Y
01|60989|1|2|3 PIN SUPPORT-MIN 9 REACH ER11 OUTPUT NO COOLANT|Y
01|60989|1|3|SUPPLY 1:1.67 GEAR RATIO MAX INPUT 7200RPM|Y
01|60989|1|4|OUTPUT 12000RPM. MAX 6NM CUTTING TORQUE|Y
01|60989|1|5|PRICE INCLUDE APPLICABLE WRENCHES|Y
01|60989|2|1|CAT50 EXTRA LENGTH RAH W/ SUPPORT PINS|Y
01|60989|2|2|3 PIN SUPPORT-MIN 9 REACH ER11 OUTPUT NO COOLANT|Y
01|60989|2|3|SUPPLY 1:1.67 GEAR RATIO MAX INPUT 7200RPM|Y
01|60989|2|4|OUTPUT 12000RPM. MAX 6NM CUTTING TORQUE|Y
01|60989|2|5|PRICE INCLUDED APPLICABLE WRENCHES|Y
01|60989|2|6|PRICE BASED ON PURCHASE OF 2 ANGLEHEADS|Y
01|60990|1|1|B4006-0500-7.50 d=1/2 L=7.50 L1=1.5 D=1.25|Y
01|60990|1|2|This is a complete Special.|Y
01|60990|2|1|B4006-0500-7.50 d=1/2 L=7.50 L1=1.5 D=1.25|Y
01|60990|2|2|This is a complete Special.|Y
01|60990|3|1|B4006-0500-7.50 d=1/2 L=7.50 L1=1.5 D=1.25|Y
01|60990|3|2|This is a complete Special|Y
01|61000|1|1|B4006-0500-7.50 d=1/2 L=7.50 L1=1.5 D=1.25|Y
01|61000|1|2|This is a complete Special.|Y
01|61000|2|1|B4006-0500-7.50 d=1/2 L=7.50 L1=1.5 D=1.25|Y
01|61000|2|2|This is a complete Special.|Y
01|61000|3|1|B4006-0500-7.50 d=1/2 L=7.50 L1=1.5 D=1.25|Y
01|61000|3|2|This is a complete Special.|Y
01|61020|5|1|Air/Hyd booster for the CNC401FA-M|Y
01|61020|6|1|INSTALLATION ON DV5100. MACHINE ALREADY HAS DDRT|Y
01|61020|6|2|INTERFACE. INTERFACE INCLUDES CABLES TRAVEL LABOR|Y
01|61020|6|3|TABLE TO BE INSTALLED HORIZONTAL|Y
01|61032|1|1|Includes: two tables sheetmetal and cabling.|Y
01|61032|4|1|Free $1K Tooling Certificate good for list price tool|Y
01|61032|4|2|holders.|Y
01|61039|1|1|Includes table and motor.|Y
01|61039|2|1|Installatin KIT Includes: drive amp bulkhead cable set|Y
01|61039|2|2|external cable set communication cable and fiber|Y
01|61039|2|3|optic cable. This is hardware components only no|Y
01|61039|2|4|software.|Y
01|61039|3|1|Hydraulic pancake cylinder to be mounted to back of|Y
01|61039|3|2|CNC202FA-M.|Y
01|61039|4|1|Hydraulic Tailstock - Center height to match CNC202FA-M|Y
01|61040|1|1|Conversion of customer CNC180-2W from Mits to OSP3|Y
01|61040|1|2|Delivery is pending at this time.|Y
01|61040|5|1|AX302R300OSP2-K Nut|Y
01|61043|1|1|Howa part# H01MA6S 1.5mm serrations flat back|Y
01|61047|7|1|Will only work on certain prequalified machines.|Y
01|61047|7|2|Check with engineering/Tim Reeves prior to purchase.|Y
01|61047|8|1|Quoted in consideration to PB-RAN40|Y
01|61047|8|2|1 Positioning block per anglehead purchase|Y
01|61048|1|1|Inspection and repair of customer's CNC180-2W|Y
01|61048|1|2|2-3 weeks for evaluation and repair.|Y
01|61061|11|1|HSK100A-C32-115G  32mm Milling Chuck High Speed|Y
01|61062|1|1|US Machine Company|Y
01|61062|1|2|32940 Janet Ave|Y
01|61062|1|3|Fraser MI 48026|Y
01|61062|1|4|586 294 5670|Y
01|61062|1|5|Att: Chris Steudle|Y
01|61062|1|6|csteudle@usmachine.com|Y
01|61088|2|1|Installation includes: external cables interface|Y
01|61088|2|2|cables labor parameter changes service time and|Y
01|61088|2|3|travel|Y
01|61121|4|1|NBT40-SK13C-90P|Y
01|61121|5|1|SK13-8A|Y
01|61121|6|1|SK13-8P|Y
01|61121|12|1|NBT40-SK13C-60P|Y
01|61121|13|1|SK13-12P|Y
01|61122|2|1|Installation includes: Dual axis drive unit short bar|Y
01|61122|2|2|communications cables fiber optic cables external|Y
01|61122|2|3|cables bulkhead cables parameter changes service|Y
01|61122|2|4|time and travel.|Y
01|61133|1|1|1 Gallon of Mobil Gear 600 XP 68|Y
01|61133|1|2|For use with Nikken Rotary Tables|Y
01|61138|2|1|Product is given in terms of NET price.|Y
01|61159|3|1|INCLUDED WITH TAILSTOCK AT N/C|Y
01|61159|4|1|MORSE TAPER #4 BULL NOSE LIVE CENTER|Y
01|61159|4|2|SMALL OD = 1 LARGE OD =4|Y
01|61159|4|3|WILL ACCOMIDATE ALL PIPE SIZES|Y
01|61159|5|1|11 RISER FOR CNC302|Y
01|61159|5|2|MFG STEEL|Y
01|61159|6|1|11 RISER FOR PBA-170 TAILSTOCK|Y
01|61159|6|2|MFG STEEL|Y
01|61159|7|1|SMW AUTOBLOCK SP350-115|Y
01|61159|7|2|SELF CONTAINED 3 JAW CHUCK WITH 115MM THRU HOLE|Y
01|61159|8|1|ROTARY TABLE ADAPTER PLATE TO ACCOMIDATE SMW CHUCK|Y
01|61159|9|1|PNEUMATIC CONTROL UNIT FOR ABOVE CHUCK|Y
01|61166|2|1|Installation includes:Drive unit short bar fiber|Y
01|61166|2|2|optic cable communications cable bulkhead cables|Y
01|61166|2|3|external cables parameter changes service time and|Y
01|61166|2|4|travel.|Y
01|61166|4|1|Installation includes: Dual axis drive unit short bar|Y
01|61166|4|2|fiber optic cablecommunications cable bulkhead cables|Y
01|61166|4|3|external cables parameter changes service time and|Y
01|61166|4|4|travel.|Y
01|61186|2|1|This line at no charge with purchase of SF unit|Y
01|61186|3|1|This line at no charge with purchase of SF unit|Y
01|61191|1|1|CNC350BFA WITHOUT MOTOR. MOTOR TO BE SUPPLIED BY|Y
01|61191|1|2|ARNOLD. L/N TO INSTALL. AIR/HYD BOOSTER FOR BRAKE|Y
01|61191|3|1|INCLUDES CABLE SET FROM TABLE TO MACHINE BULKHEAD|Y
01|61191|3|2|NEED TO CONFIRM LENGTH|Y
01|61191|7|1|INSTALLATION INCLUDES DRIVE CABLES CONNECTORS|Y
01|61191|7|2|OPTIC CABLES. CONFIRMATION TO MACHINE NEEDED|Y
01|61191|7|3|MACHINE DATA SHEETS REQUIRED PRIOR TO INSTALLATION|Y
01|61206|1|1|Coolant nut installed|Y
01|61206|2|1|Coolant nut installed|Y
01|61208|3|1|Will hold #4 & #6 Tap|Y
01|61208|4|1|#8 Tap|Y
01|61208|5|1|#10 Tap|Y
01|61211|1|1|5AX-350 INCLUDES MELDAS MOTORS AND WIRE HARNESS|Y
01|61211|1|2|ALSO INCLUDED IS HYDRAULIC UNIT FOR TABLE BRAKE|Y
01|61211|1|3|SPECIAL PRICING|Y
01|61213|1|1|Table with Fanuc motor and air brake.|Y
01|61213|2|1|4 spindle tailstock that matches the C/L height and|Y
01|61213|2|2|spindle pitch/spacing.|Y
01|61213|3|1|Manual 5C fixture.  Half turn actuation - Dead Length|Y
01|61213|4|1|Hand valve for actuation pneumatic tailstocks.|Y
01|61213|5|1|Installation includes: Drive amp all needed cabling|Y
01|61213|5|2|parameter changes travel and labor for installing|Y
01|61213|5|3|one rotary table on one new Doosan VMC.|Y
01|61213|5|4|Pricing is contingent on machines being pre-wired for|Y
01|61213|5|5|fourth axis and doing all three installs at once.|Y
01|61213|6|1|Free $1K Tooling Certificate good for list price tool|Y
01|61213|6|2|holders.|Y
01|61233|8|1|Pre-balanced at G6.3 up to 10k RPM not balanceable|Y
01|61233|9|1|Pre-balanced at G2.5 up to 15k RPM balanceable|Y
01|61267|4|1|*Pricing of NC5 holder includes installed Pull Stud|Y
01|61270|1|1|IT40-HC20-4.00|Y
01|61270|3|1|IT40-HC32-4.00|Y
01|61275|1|1|Rego#2130.11616|Y
01|61275|2|1|Rego#2130.11610|Y
01|61285|1|1|SK20 Collet Set Inch consisting of:|Y
01|61287|1|1|Table with motor and hyd brake|Y
01|61287|2|1|Air/Hydraulic Booster for Hyd Brake on table.|Y
01|61287|3|1|Outward bearing support with break - Pneumatic|Y
01|61287|4|1|Includes: Bulkhead cable set External cable set|Y
01|61287|4|2|Fiber optic cable communications cable parameter|Y
01|61287|4|3|changes travel and labor for installing one rotary|Y
01|61287|4|4|table on one VMC.|Y
01|61288|1|1|SK20 Collet Set Metric consisting of:|Y
01|61292|1|1|Price on holder reflects Net chg for DIN modification|Y
01|61292|5|1|Price on holder reflects Net chg for DIN modification|Y
01|61293|3|1|MANUAL OPTION|Y
01|61293|5|1|Install Includes: Bulkhead cable set external cable|Y
01|61293|5|2|set communications cable fiber optic cable parameter|Y
01|61293|5|3|changes travel and labor for installing one rotary on|Y
01|61293|5|4|one new VMC.|Y
01|61293|6|1|Free $1K Tooling cert per table good for list price|Y
01|61293|6|2|tool holders.|Y
01|61301|1|1|Table with HAAS motors and cables|Y
01|61301|2|1|Free Extended Warranty 1 Year 2 Years total warranty.|Y
01|61303|1|1|CNC350BFA WITHOUT MOTOR. MOTOR TO BE SUPPLIED BY|Y
01|61303|1|2|ARNOLD. L/N TO INSTALL. AIR/HYD BOOSTER FOR BRAKE|Y
01|61303|3|1|INCLUDES CABLE SET FROM TABLE TO MACHINE BULKHEAD|Y
01|61303|3|2|NEED TO CONFIRM LENGTH|Y
01|61303|7|1|INSTALLATION INCLUDES DRIVE CABLES CONNECTORS|Y
01|61303|7|2|OPTIC CABLES. CONFIRMATION TO MACHINE NEEDED|Y
01|61303|7|3|MACHINE DATA SHEETS REQUIRED PRIOR TO INSTALLATION|Y
01|61310|1|1|CNC350BFA WITHOUT MOTOR. MOTOR TO BE SUPPLIED BY|Y
01|61310|1|2|ARNOLD. L/N TO INSTALL. AIR/HYD BOOSTER FOR BRAKE|Y
01|61310|3|1|INCLUDES CABLE SET FROM TABLE TO MACHINE BULKHEAD|Y
01|61310|3|2|NEED TO CONFIRM LENGTH|Y
01|61310|7|1|INSTALLATION INCLUDES DRIVE CABLES CONNECTORS|Y
01|61310|7|2|OPTIC CABLES. CONFIRMATION TO MACHINE NEEDED|Y
01|61310|7|3|MACHINE DATA SHEETS REQUIRED PRIOR TO INSTALLATION|Y
01|61321|1|1|400MM table with Alpha 22 high voltage motor.|Y
01|61321|3|1|Heidenhain +/-5 seconds scale with mounting kit.|Y
01|61321|3|2|RCN2390|Y
01|61345|1|1|Reference RGA# LVR-48784|Y
01|61345|1|2|T3204A07 s/n: A0026|N
01|61345|3|1|Drive shaft is damaged and must be replaced. Bearings|Y
01|61345|3|2|seals and o-rings are worn and must also be replaced.|Y
01|61345|3|3|Collet nut must also be replaced. Labor is included.|Y
01|61345|5|1|T32005A08 s/n: A0160|N
01|61345|7|1|Spindle and drive shaft are damaged and must be|Y
01|61345|7|2|replaced. Bearings seals and o-rings are worn and must|Y
01|61345|7|3|be replaced. Collet nut must also be replaced. Labor is|Y
01|61345|7|4|included.|Y
01|61345|9|1|T32005A08 s/n: A0280|N
01|61345|11|1|Spindle and drive shaft are damaged and must be|Y
01|61345|11|2|replaced. Bearings seals and o-rings are worn and must|Y
01|61345|11|3|be replaced. Collet nut must also be replaced. Labor is|Y
01|61345|11|4|included.|Y
01|61390|1|1|Master Jaw set for Howa Chuck H01MA21 R-1774 (3pc set)|Y
01|61393|1|1|Master Jaw set for Howa Chuck H01MA21 M-882A (3pc set)|Y
01|61400|1|1|Table with Fanuc motors|Y
01|61400|2|1|Installation Kit|Y
01|61400|2|2|Kit Includes: Drive amp bulk head cable set external|Y
01|61400|2|3|cable set communication cable fiber optic cable.|Y
01|61400|2|4|Heartland ME must provide machine data sheet upon|Y
01|61400|2|5|placing a PO.|Y
01|61413|6|1|Quoted at a net price|Y
01|61420|1|1|Reference RGA# LVR-48849|Y
01|61420|1|2|OKL3-ER32Z-OFS s/n: AL003|N
01|61420|3|1|Bearings seals and o-rings are worn and must be|Y
01|61420|3|2|replaced. Collet nuts must also be replaced. Labor is|Y
01|61420|3|3|included.|Y
01|61420|5|1|OKLT1-ER20Z-M s/n: AL020|N
01|61420|7|1|Bearings seals and o-rings are worn and must be|Y
01|61420|7|2|replaced. Collet nut must also be replaced. Labor is|Y
01|61420|7|3|included.|Y
01|61423|1|1|200MM table set up for Fadal DC motor.|Y
01|61425|1|1|AC6-AXSB101-69390 Capto6 Alps Sensor Holder for DMG/|Y
01|61425|1|2|Mori NT 4250DCG/1500SZ|Y
01|61426|1|1|Reference RGA# TAR-48772|Y
01|61426|1|2|5AX-550FA s/n: 1112|Y
01|61446|1|1|These jaws are priced as each. Needs 3pcs for set.|Y
01|61470|1|1|table with fanuc motor|Y
01|61470|2|1|Install Includes: Drive amp bulk head cables external|Y
01|61470|2|2|cable set communication cables fiber optic cable|Y
01|61470|2|3|parameter changes travel and labor for installing one|Y
01|61470|2|4|rotary table on one new Doosan DNM500 VMC.|Y
01|61475|1|1|This is non stock item. We can get air from Japan.|Y
01|61483|3|1|Quoted at a net price|Y
01|61484|5|1|Quoted in consideration to SK25-7/8|Y
01|61484|5|2|7/8IN=.625IN=15.87MM|Y
01|61486|1|1|Table with Fanuc motor and Pneumatic brake.|Y
01|61486|2|1|Chuck and adapter plate for CNC260|Y
01|61486|3|1|Manaual tailstock - traditional style.|Y
01|61486|4|1|Installation Includes: Drive amp bulkhead cable set|Y
01|61486|4|2|external cable set communications cable fiber optic|Y
01|61486|4|3|cable parameter changes travel and labor for|Y
01|61486|4|4|installing one rotary table on one new VMC.|Y
01|61499|5|1|Air/Hyd booster for brake|Y
01|61499|5|2|TO BE USED HORIZONTAL APPLICATION|Y
01|61499|6|1|INSTALLATION ON DV5100. MACHINE ALREADY HAS DDRT|Y
01|61499|6|2|INTERFACE. INTERFACE INCLUDES CABLES TRAVEL LABOR|Y
01|61499|6|3|TABLE TO BE INSTALLED HORIZONTAL|Y
01|61526|3|1|TWIN SPINDLE TABLE INCLUDES SERV MOTORS AND HYDRAULIC|Y
01|61526|3|2|FOR BRAKE SYSTEM|Y
01|61526|5|1|ATLAS 5C COLLET CHUCK|Y
01|61534|3|1|NCAT50-VC13-105U-IDU|Y
01|61546|1|1|HSK63A(80)-C1.1/4 same dimensions as UNV 76.|Y
01|61546|1|2|2.RFID chip hole (they will install chip) per UNV 199.|Y
01|61546|1|3|3.Other than nut OD 2.667 Hi-Speed Nut all other|Y
01|61546|1|4|dimensions must be according to print.|Y
01|61546|1|5|4.No need to balance only 1800-2000 rpm|Y
01|61546|1|6|Due to OD restrictions standard high speed nut 2.667|Y
01|61546|1|7|is required.|Y
01|61546|1|8|Quoted 10 to 19 holders.|Y
01|61546|3|1|Special HSK63A(80)-C1.1/4 same dimensions as UNV 76.|Y
01|61546|3|2|RFID chip hole (they will install chip) per UNV 199.|Y
01|61546|3|3|Other than nut OD 2.667 Hi-Speed Nut all other|Y
01|61546|3|4|must be according to print.|Y
01|61546|3|5|No need to balance only 1800-2000 rpm|Y
01|61546|3|6|Due to OD restrictions standard high speed nut 2.667|Y
01|61546|3|7|is required.|Y
01|61546|3|8|Quoted 100 pieces|Y
01|61556|1|1|HSK63A Special 80mm flange 1.1/4 Shrink Fit Holder|Y
01|61556|1|2|GKN UNV 524|Y
01|61556|1|3|HSK63A(80)-SF1250-3.375>>>No Balance Screws Required.|Y
01|61558|2|1|Installation includes: Drive unit short bar fiber|Y
01|61558|2|2|optic cable communications cable bu;lkhead cables|Y
01|61558|2|3|external cables parameter changes service time and|Y
01|61558|2|4|travel.|Y
01|61560|1|1|HSK63A(80) Hydraulic Holder 3/4 X 3.375 Gage Length|Y
01|61560|1|2|Chip Hole Only (GKN to install chip) Similar to UNV338|Y
01|61560|1|3|OD of body of holder must not exceed the tip diameter.|Y
01|61560|1|4|RPM 1800~2000|Y
01|61560|3|1|HSK63A(80) Hydraulic Holder 3/4 X 3.375 Gage Length|Y
01|61560|3|2|Chip Hole Only (GKN to install chip) Similar to UNV338|Y
01|61560|3|3|OD of body of holder must not exceed the tip diameter.|Y
01|61560|3|4|RPM 1800~2000|Y
01|61560|5|1|HSK63A(80) Hydraulic Holder 3/4 X 3.375 Gage Length|Y
01|61560|5|2|Chip Hole Only (GKN to install chip) Similar to UNV338|Y
01|61560|5|3|OD of body of holder must not exceed the tip diameter.|Y
01|61560|5|4|RPM 1800~2000|Y
01|61560|7|1|HSK63A(80) Hydraulic Holder 1.0 X 3.375 Gage Length|Y
01|61560|7|2|Chip Hole Only (GKN to install chip) Similar to UNV 76|Y
01|61560|7|3|OD of body of holder must not exceed the tip diameter.|Y
01|61560|7|4|RPM 1800~2000|Y
01|61560|9|1|HSK63A(80) Hydraulic Holder 1.0 X 3.375 Gage Length|Y
01|61560|9|2|Chip Hole Only (GKN to install chip) Similar to UNV 76|Y
01|61560|9|3|OD of body of holder must not exceed the tip diameter.|Y
01|61560|9|4|RPM 1800~2000|Y
01|61560|11|1|HSK63A(80) Hydraulic Holder 1.0 X 3.375 Gage Length|Y
01|61560|11|2|Chip Hole Only (GKN to install chip) Similar to UNV 76|Y
01|61560|11|3|OD of body of holder must not exceed the tip diameter.|Y
01|61560|11|4|RPM 1800~2000|Y
01|61568|2|1|Rustproof treatment|Y
01|61569|1|1|H037M5 Soft jaws High: J2 = 2.00|Y
01|61569|1|2|Price is per SET (=3pcs)|Y
01|61569|2|1|H037M5 Soft jaws Extra High: J2 = 3.00|Y
01|61569|2|2|Price is per SET (=3pcs)|Y
01|61569|3|1|H037M5 Hard jaws|Y
01|61569|3|2|Price is per SET (=3pcs)|Y
01|61569|4|1|H037M5 Hard jaws T-Nut|Y
01|61569|4|2|Price is per SET (=3pcs)|Y
01|61569|5|1|H037M5 Pie Jaws|Y
01|61569|5|2|Price is per SET (=3pcs)|Y
01|61572|1|1|Reference RGA# TOR-48839|Y
01|61572|1|2|CAT40-MMC8C-90U|N
01|61597|1|1|CAT50 End Mill Holder 2ID 3OD 5.625 GL|Y
01|61597|1|2|ETA approx 8-10 weeks|Y
01|61599|1|1|Reference RGA# TOR-48814|Y
01|61599|1|2|HSK100A-C25EX-115-IDU|N
01|61608|1|1|3PCS available for purchase|Y
01|61608|2|1|15pcs available for purchase|Y
01|61608|3|1|9PCS available for purchase|Y
01|61623|2|1|NO EXTERNAL CABLES NEEDED|Y
01|61625|1|1|CNC350BFA WITHOUT MOTOR. MOTOR TO BE SUPPLIED BY|Y
01|61625|1|2|ARNOLD. L/N TO INSTALL. AIR/HYD BOOSTER FOR BRAKE|Y
01|61625|3|1|INCLUDES CABLE SET FROM TABLE TO MACHINE BULKHEAD|Y
01|61625|3|2|NEED TO CONFIRM LENGTH|Y
01|61625|7|1|INSTALLATION INCLUDES DRIVE CABLES CONNECTORS|Y
01|61625|7|2|OPTIC CABLES. CONFIRMATION TO MACHINE NEEDED|Y
01|61625|7|3|MACHINE DATA SHEETS REQUIRED PRIOR TO INSTALLATION|Y
01|61636|7|1|NC4006-32-4.00|Y
01|61636|7|2|Delivery to be determined at time of order.|Y
01|61636|13|1|TG100-Tap Collets NOT Available|Y
01|61692|21|1|WILL FIT 11/16|Y
01|61692|22|1|WILL FIT 3/4|Y
01|61692|23|1|WILL FIT 13/16|Y
01|61692|24|1|WILL FIT 7/8|Y
01|61692|25|1|WILL FIT 15/16|Y
01|61692|26|1|WILL FIT 1|Y
01|61701|3|1|Price for ID Chip Hole Only reflects NET Charge each|Y
01|61713|1|1|Coolant Nut pre-installed|Y
01|61713|2|1|Coolant nut pre-installed|Y
01|61715|1|1|Reference RGA# TAR-48816|Y
01|61715|1|2|5AX-130FA s/n: 1718|N
01|61721|1|1|Pricing reflects 1-2pcs|Y
01|61721|2|1|Pricing reflects 3-4pcs|Y
01|61721|3|1|Pricings reflects 5+pcs|Y
01|61736|1|1|P# NBT30-MDSK13-60|Y
01|61738|2|1|S15-ZMACX16-120C requesting from factory|N
01|61744|1|1|CNCZ-180 HIGH SPEED NIKKEN TABLE. MOTOR AND CABLES TO|Y
01|61744|1|2|BE SUPPLIED BY HFO/TAMPA|Y
01|61744|5|1|6 AIR POWER CHUCK|Y
01|61744|7|1|INCLUDES CHUCK ADAPTER PLATE AND DRAW BAR|Y
01|61744|9|1|MANUAL SCROLL CHUCK 6|Y
01|61760|1|1|Spcl BT40 30mm Stub Mill Arbor w/ 162mm GL & M24 thread|Y
01|61765|1|1|Reference RGA# TAR-48767|Y
01|61765|1|2|5AX-2002 s/n: 2057|N
01|61767|1|1|Price reflects NET each w/ DIN modification|Y
01|61783|1|1|Reference RGA# TOR-48847|Y
01|61783|1|2|Repair quote for C50R5-1375-5.00(C)Tap collet comes|Y
01|61783|1|3|disengaged during tapping cycle.|Y
01|61783|2|1|NT1375(C)-9 #9 Spring|Y
01|61783|3|1|NT1375(C)-8 #8 Spring|Y
01|61783|4|1|NT1375(C)-7 #7 Special Screw|Y
01|61783|5|1|NT1375(C)-6 O-Ring|Y
01|61783|6|1|NT1375(C)- O-Ring|Y
01|61783|7|1|Labor is $110.00/hr this unit will require 1.5 hrs|Y
01|61783|7|2|of labor.|Y
01|61795|1|1|HSK50-LP HSK50 Coolant Tube|Y
01|61799|1|1|Reference RGA# TAR-48876|Y
01|61799|1|2|5AX-130BAYA-BR-QT s/n: 3799|N
01|61814|4|1|CAT50 18mm End Mill Holder w/ 6.00 gage length|Y
01|61814|4|2|C5006-18-6.00|Y
01|61814|5|1|CAT50 8mm End Mill Holder w/ 6.00 gage length|Y
01|61814|5|2|C5006-8-6.00|Y
01|61819|1|1|Reference RGA# TOR-48869|Y
01|61819|1|2|PF-2|N
01|61824|1|1|TCE-95523 M-Signal Cable for 5AX-120|Y
01|61831|3|1|Installation Includes: Drive amp cabling parameter|Y
01|61831|3|2|changes travel and labor for installing one DD rotary|Y
01|61831|3|3|table on one VMC.|Y
01|61832|1|1|Reference RGA# TOR-48913|Y
01|61832|1|2|CAT40-C3/4-70U|N
01|61832|9|1|Inspection fee for unrepraibale CAT40-C3/4-70U.|Y
01|61835|1|1|HSK63A-SCA32-90  HSK63A 32mm Stub Mill Arbor|Y
01|61837|11|1|***Free w/ purchase of CAT40 holder**|Y
01|61839|3|1|BT30-SF6-3.15|Y
01|61845|1|1|Bob G Machining|Y
01|61845|1|2|33445 Kelly Rd|Y
01|61845|1|3|Fraser MI 48026|Y
01|61845|1|4|Ph: 586 285 1400|Y
01|61845|1|5|Attn: Bob G|Y
01|61846|5|1|Install for (2) YCM WV-108B|Y
01|61847|1|1|Reference RGA# LVR-48825|Y
01|61847|1|2|MZQT47-ER32Z s/n: 50904 05|N
01|61847|3|1|Bearings seals and o-rings are worn and must be|Y
01|61847|3|2|replaced. Labor is included.|Y
01|61850|1|1|Table with Fanuc motor|Y
01|61850|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|61850|2|2|external cable set communication cable fiber optic|Y
01|61850|2|3|cable parameter changes travel and labor for|Y
01|61850|2|4|installing one rotary table on one Doosan DMV3016 VMC.|Y
01|61851|1|1|Non-returnable Non-cancellable|Y
01|61851|2|1|Non-returnable Non-cancelable|Y
01|61852|1|1|Table with Fanuc motors and AIR Clamp.|Y
01|61852|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|61852|2|2|external cable set communication cable fiber optic|Y
01|61852|2|3|cable parameter changes travel and labor for|Y
01|61852|2|4|installing one 5AX table on one new YCM VMC.|Y
01|61860|2|1|Installation includes: Dual axis drive fiber optic|Y
01|61860|2|2|cables communications cables bulkhead cables|Y
01|61860|2|3|external cables parameter changes service time and|Y
01|61860|2|4|travel.|Y
01|61861|1|1|Table with Fanuc motors and AIR clamp|Y
01|61861|2|1|Installation Includes: drive amp bulk head cables|Y
01|61861|2|2|external cable sets communication cable fiber optic|Y
01|61861|2|3|cable parameter changes travel and labor for|Y
01|61861|2|4|installing one 5AX table on one new YCM VMC.|Y
01|61863|1|1|Reference RGA# LVR-48875|Y
01|61863|1|2|T32106B10 s/n: A0073|N
01|61863|3|1|Bearings seals and o-rings are worn and must be|Y
01|61863|3|2|replaced. Collet nut must also be replaced. Labor is|Y
01|61863|3|3|included.|Y
01|61863|5|1|T32106B11 s/n: A1264|N
01|61863|7|1|Bearings seals and o-rings are worn and must be|Y
01|61863|7|2|replaced. Collet nut must also be replaced. Labor is|Y
01|61863|7|3|included.|Y
01|61866|1|1|**Non-Coolant|Y
01|61866|1|2|**Special Pricing|Y
01|61866|3|1|S15-ZMACX16-120C requesting from factory|N
01|61881|1|1|Reference RGA# LVR-48897|Y
01|61881|1|2|OKU-L370-Z (OKL3-ER32Z)s/n: AL0064|N
01|61881|4|1|Bearings seals and o-rings are worn and must be|Y
01|61881|4|2|replaced. Collet nut must also be replaced. Labor is|Y
01|61881|4|3|included.|Y
01|61898|1|1|C5006-1000-4.00-JS CAT50 1 EMH 4 GL w/Jet Slots|Y
01|61898|2|1|C5026-0750-6.00-JS CAT50 3/4 EMH 6 GL w/Jet Slots|Y
01|61898|3|1|C5026-0375-6.00-JS CAT50 3/8 EMH 6 GL w/Jet Slots|Y
01|61898|4|1|C5016-0500-4.00-JS CAT50 1/2 EMH 4 GL w/Jet Slots|Y
01|61898|5|1|C5026-0500-6.00-JS CAT50 1/2 EMH 6 GL w/Jet Slots|Y
01|61898|6|1|C5016-0250-4.00-JS CAT50 1/4 EMH 4 GL w/Jet Slots|Y
01|61898|7|1|C5026-0250-6.00-JS CAT50 1/4 EMH 6 GL w/Jet Slots|Y
01|61901|3|1|We do not offer this in Taper Plus.|Y
01|61901|23|1|Quoted at a net price|Y
01|61906|1|1|Competitor Part Number ER32 SRK 1/4x1.50 EXT|Y
01|61906|3|1|Competitor Part # ER32 SRK 1/8x3.50 EXT|Y
01|61909|1|1|C50RAM-MI50-285ST-80FP/Mimatic #135638 no coolant|Y
01|61909|1|2|Net price quoted.|Y
01|61909|3|1|C50RAM-MI50-285STEC-80FP/Mimatic #162943|Y
01|61909|3|2|External Coolant|Y
01|61909|3|3|Net price quoted.|Y
01|61909|16|1|KM63XMZ Taper Slim Type MI50 Output|Y
01|61909|16|2|No Coolant Max 6000 rpm 70Nm|Y
01|61909|16|3|Net price quoted for quantity of 1 tool.|Y
01|61909|17|1|KM63XMZ Taper Slim Type MI50 Output|Y
01|61909|17|2|No Coolant Max 6000 rpm 70Nm|Y
01|61909|17|3|Net price quoted for quantity of 2 tools.|Y
01|61924|4|1|Only offered in the SK16-1/4A style|Y
01|61928|1|1|Table with motors|Y
01|61928|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|61928|2|2|external cable set communication cable fiber optic|Y
01|61928|2|3|cable parameter changes travel and service labor for|Y
01|61928|2|4|installing one 5AX table on one new DMG-MORI VMC.|Y
01|61934|1|1|SP165748 Split Inductor Stop Ring >>>Drawing Attached|Y
01|61934|1|2|Quoted as 1 ~ 20 Pieces|Y
01|61934|3|1|SP165748 Split Inductor Stop Ring >>>Drawing Attached|Y
01|61934|3|2|Quoted as 30+ Pieces|Y
01|61952|6|1|Promotional item**Quoted for consideration*******|Y
01|61960|3|1|This line is referenced at your NET cost|Y
01|61971|3|1|Back-Order of 3 pieces due 13 Weeks|Y
01|61971|51|1|Net price reflects purchase of retention knob with|Y
01|61971|51|2|matching taper holder.|Y
01|62005|1|1|ONE TIME SPECIAL PRICING|Y
01|62017|1|1|Pricing reflects 1-3pcs|Y
01|62017|3|1|Pricing Reflects 4-7pcs|Y
01|62017|3|2|7PCS currently available|Y
01|62027|1|1|Non-returnable Non-cancellable|Y
01|62034|1|1|18 Stock balance of 7 pcs ETA 11/16|Y
01|62047|1|1|Reference RGA# TOR-48934|Y
01|62047|1|2|2x CAT40-NPU8-80U|N
01|62063|1|1|Reference RGA# TAR-48714|Y
01|62063|1|2|5AX-4MT-105-120MA s/n: 1100|N
01|62063|59|1|W4121R016: Bracket B|Y
01|62063|60|1|W4121R017: Shim Plate B|Y
01|62063|61|1|AR-28: Cripper|Y
01|62079|3|1|METRIC DIAL|Y
01|62079|4|1|D.M7-62 (INCH DIAL)|Y
01|62079|4|2|Spare Part Set: BCB62: B317 B327 M337 9M770P|Y
01|62088|7|1|IMTS Promo Only 5 free holders.|Y
01|62096|1|1|Table with Fanuc motor.|Y
01|62096|1|2|Table is set up with pneumatic brake as a standard but|Y
01|62096|1|3|can be equiped with hydraulic brake by adding the|Y
01|62096|1|4|booster on line #2.|Y
01|62096|2|1|***OPTIONAL*** Booster for hydraulic braking on table.|Y
01|62096|3|1|Pneumatic tailstock to match CNC302 center height.|Y
01|62096|4|1|Installation Includes: drive amp bulk head cable set|Y
01|62096|4|2|external cable set communication cable fiber optic|Y
01|62096|4|3|cable parameter changes travel and service labor for|Y
01|62096|4|4|installing one rotary table on one Mori DV5100 VMC.|Y
01|62116|1|1|Reference RGA# TOR-48845|Y
01|62116|1|2|SF-START2-UNIT-200|N
01|62142|3|1|Wrench added for consideration|Y
01|62149|3|1|Custom Positioning Block per specs sent by End User|Y
01|62166|1|1|KM22-7/16 Milling Chuck Collet - Special C22OD 7/16 ID|Y
01|62168|1|1|CAT50 Straight/Offset Style RAH MI40 Output|Y
01|62168|1|2|External Coolant Max 6000 RPM/25Nm|Y
01|62168|1|3|Net price reflects a purchse order for minimum of 1-pc.|Y
01|62168|3|1|CAT50 Straight/Offset Style RAH MI40 Output|Y
01|62168|3|2|External Coolant Max 6000 RPM/25Nm|Y
01|62168|3|3|Net price reflects a purchse order for minimum of 2-pcs|Y
01|62186|7|1|IMTS Promo: One free retention knob with the purchase|Y
01|62186|7|2|of a matching taper toolholder.|Y
01|62209|4|1|Balance in 1-2 Weeks ARO|Y
01|62217|2|1|Any Balance ETA 10 Weeks|Y
01|62220|1|1|NC5-63-SK16C-200|Y
01|62227|2|1|Balance ETA 10 Weeks|Y
01|62227|3|1|1 pull stud @ $5.00 net w/ purchase of matching holder|Y
01|62247|22|1|IMTS Promo: One free knob with the purchase of a|Y
01|62247|22|2|matching taper toolholder.|Y
01|62269|1|1|Reference RGA# CUR-48921|Y
01|62269|1|2|CAT50U-NX5-151|N
01|62270|5|1|INSTALLATION INCLUDES EXTERNAL CABLES FROM ROTARY TABLE|Y
01|62270|5|2|TO BULKHEAD. MACHINE HAS 4TH AXIS INTERFACE ALREADY|Y
01|62270|5|3|motor to be used alpha/8iF|Y
01|62270|5|5|TABLE WILL HAVE SERVO MOTOR INTERNAL WIRE HARNESS|Y
01|62272|2|1|TABLE SUPPLIED WITH SERVO MOTORS CONNECTORS|Y
01|62272|2|2|TABLE TO BE SET UP THE SAME AS EXISTING TABLE WITH|Y
01|62272|2|3|S/N 1540. TABLE IS STOCK 1 WEEK OR LESS TO CONFIGURE|Y
01|62275|1|1|Confirmation of servo motor needed.|Y
01|62275|1|2|Delivery based upon availbility of servo motor|Y
01|62275|1|3|Wiring schematics may be required|Y
01|62278|1|1|Table with Fanuc motors.|Y
01|62278|2|1|External cables (power/signal and feedback)|Y
01|62285|1|1|Quoted at a net price|Y
01|62285|2|1|KM12-1/4|Y
01|62285|2|2|Quoted at a net price|Y
01|62295|2|1|Quoted for consideration|Y
01|62305|2|1|Kennametal Cross|Y
01|62306|1|1|Direct mount cable for CNCZ105LFA s/n: 2030|Y
01|62332|1|1|C4016-0250-4.00DIN|Y
01|62332|1|2|CAT40 1/4 End Mill Holder with DIN|Y
01|62332|1|3|Non-Returnable Non-Cancelable|Y
01|62336|2|1|C4016-0250-4.00-DIN|Y
01|62336|2|2|CAT40 1/4 End Mill Holder with DIN|Y
01|62339|1|1|HSK63F-SK16-90P  SK16 Slim Chuck X 90mm Gage Length|Y
01|62347|2|1|1 Free Knob w/ Purchase of ANY matching holder|Y
01|62349|1|1|Table with Fanuc motor|Y
01|62349|2|1|***Pneumatic Option***|Y
01|62349|3|1|***Manual Option***|Y
01|62349|4|1|Install Includes: Drive amp bulk head cable set|Y
01|62349|4|2|external cable set communication cable fiber optic|Y
01|62349|4|3|cable parameter changes travel and labor for install|Y
01|62349|4|4|of one rotary table on one VMC.|Y
01|62351|1|1|Table with Fanuc motor.|Y
01|62351|2|1|***Pneumatic Option***|Y
01|62351|3|1|***Manual Option***|Y
01|62351|4|1|Install Includes: Drive amp bulk head cable set|Y
01|62351|4|2|external cable set communication cable fiber optic|Y
01|62351|4|3|cable parameter changes travel and labor for install|Y
01|62351|4|4|of one rotary table on one VMC.|Y
01|62352|1|1|Table with Fanuc motor and air brake.|Y
01|62352|2|1|***Pneumatic Option***|Y
01|62352|3|1|***Manual Option***|Y
01|62352|4|1|Install Includes: Drive amp bulk head cable set|Y
01|62352|4|2|external cable set communication cable fiber optic|Y
01|62352|4|3|cable parameter changes travel and labor for install|Y
01|62352|4|4|of one rotary table on one VMC.|Y
01|62353|1|1|Reference RGA# TOR-48913|Y
01|62353|1|2|CAT40-C3/4-70U|N
01|62353|9|1|Inspection fee for unrepraibale CAT40-C3/4-70U.|Y
01|62364|1|1|Reference RGA# TOR-48847|Y
01|62364|1|2|Repair quote for C50R5-1375-5.00(C)Tap collet comes|Y
01|62364|1|3|disengaged during tapping cycle.|Y
01|62364|7|1|Labor is $110.00/hr this unit will require 1.5 hrs|Y
01|62364|7|2|of labor.|Y
01|62367|1|1|Quoted at a net price|Y
01|62367|1|2|Part#VDI30-OD75X-OHB3|Y
01|62367|1|3|Right Handed Tool-Static X-Axis OD3/4 Overhead|Y
01|62370|9|1|CONFIRMATION 24DC/100AC|Y
01|62370|13|1|installation includes 4th axis drive fiber optics|Y
01|62370|13|2|internal cablesconnectors travle labor|Y
01|62376|7|1|5th Axis Installation includes Drives Inside Cables|Y
01|62376|7|2|Fiber Optics Connectors Travel & Labor|Y
01|62380|1|1|1 pull stud at $5.00/net with purchase of a matching|Y
01|62380|1|2|CAT40 toolholder.|Y
01|62383|1|1|#5 Pin for 570-CLOSE|Y
01|62383|2|1|#6 Pin for 570-CLOSE|Y
01|62411|1|1|Reference RGA# TAR-48909|Y
01|62411|1|2|5AX-201FA s/n: 5285|N
01|62417|1|1|1-9pc pricing|Y
01|62417|2|1|10-19pcs|Y
01|62419|3|1|4 Gage Length  -   Pre-balanced and Balanceable|Y
01|62419|3|2|**Special one time pricing**|Y
01|62436|4|1|$ 1000 Tool certificate at no charge|Y
01|62438|7|1|INSTALLATION INCLUDES DRIVE WIRE HARNESS CABLE FROM|Y
01|62438|7|2|SERVO TO BULKHEAD LABOR TRAVEL TRAINING|Y
01|62438|8|1|L/N TO CONFIRM CABLE P/N AND LENGTH|Y
01|62443|2|1|EXTERNAL CABLES INCLUDED IN INSTALLATION|Y
01|62443|3|1|external cables included|Y
01|62443|5|1|INSTALLATION INCLUDES EXTERNAL CABLES FROM ROTARY TABLE|Y
01|62443|5|2|TO BULKHEAD. MACHINE HAS 4TH AXIS INTERFACE ALREADY|Y
01|62443|5|3|motor to be used alpha/8iF|Y
01|62443|5|5|TABLE WILL HAVE SERVO MOTOR INTERNAL WIRE HARNESS|Y
01|62445|2|1|HFO TO SUPPLY MOTORS AND CABLES FOR BOTH AXIS|Y
01|62446|4|1|External cables for CNC180FA-M.|Y
01|62447|1|1|180MM table with motor external cable set|Y
01|62447|1|2|installation kit.|Y
01|62447|2|1|180MM table W/O motor W/ external cable set|Y
01|62447|2|2|installation kit.|Y
01|62447|3|1|200MM table with motor external cable set|Y
01|62447|3|2|installtion kit.|Y
01|62447|4|1|200MM table W/O motorW/ external cable set|Y
01|62447|4|2|installtion kit.|Y
01|62447|5|1|260MM table with motor external cable set|Y
01|62447|5|2|installation kit.|Y
01|62447|6|1|260MM table W/O motorW/ external cable set|Y
01|62447|6|2|installtion kit.|Y
01|62447|8|1|300MM table with motor external cable set|Y
01|62447|8|2|installtion kit.|Y
01|62447|10|1|300MM table W/O motorW/external cable set|Y
01|62447|10|2|installation kit.|Y
01|62447|18|1|Midwest install includes: Cable set installation|Y
01|62447|18|2|parameter changes service time and travel.|Y
01|62447|19|1|East coast install includes: Cable set installation|Y
01|62447|19|2|parameter changes service time and travel.|Y
01|62447|20|1|West Coast install includes: Cable set installation|Y
01|62447|20|2|parameter changes service time and travel.|Y
01|62447|21|1|DMG Mori Davis factory install includes: Cable set|Y
01|62447|21|2|installationparameter changes service time and travel|Y
01|62449|2|1|Installation includes: Drive unit short bar fiber|Y
01|62449|2|2|optic cable external cables bulkhead cables|Y
01|62449|2|3|parameter changes service time and travel.|Y
01|62452|4|1|10-pcs stock >> Balance 15 3~4 Weeks >> 15 13~14 Weeks|Y
01|62452|10|1|HSK40A-Testbar-8.00 with 1.1/2 diameter.|Y
01|62452|10|2|Net price quoted.|Y
01|62453|1|1|Pricing reflects 1-2pcs|Y
01|62453|2|1|Pricing reflects 3-5pcs|Y
01|62474|3|1|Adaptor Plate A25~A26 >>> Net Price Quoted|Y
01|62492|1|1|Please verify shank and drive dimensions prior to|Y
01|62492|1|2|puchase|Y
01|62492|1|3|Shank=.428 Square=.328|Y
01|62492|1|4|Quoted at a net price|Y
01|62502|1|1|Table with Okuma motor.|Y
01|62502|2|1|Pneumatic actuation with MT#3 center sockets.|Y
01|62502|2|2|Centerline and Spacing with match rotary table.|Y
01|62502|3|1|Hand Valve for actuating pheumatic tailstocks.|Y
01|62504|1|1|CAT40 Spindle Speeder|Y
01|62504|1|2|Output-ETS High Precision collets max shank 8mm/5/16|Y
01|62504|1|3|Max RPM Output 40000RPM - Duty Rated 10% of 90 min|Y
01|62504|1|4|duty cyle 36000RPM - Duty Rated 50% of 90 min duty|Y
01|62504|1|5|cycle. MAX Continuous 28000RPM|Y
01|62504|2|1|ETS 14 Collet 3-8mm dia. .5mm increments|Y
01|62504|3|1|ETS 14 Collet true inch sizes 1/8-5/16 1/16|Y
01|62504|3|2|increments.|Y
01|62512|1|1|Delivery on November 1st if order today|Y
01|62536|1|1|Table with HAAS motors and air brake.|Y
01|62537|1|1|Only taking 1 cooling station with this machine|Y
01|62542|1|1|Table with Fanuc motors.|Y
01|62542|2|1|Scale for table axis - $10000 NET charge per axis|Y
01|62542|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|62542|3|2|external cable set communication cable fiber optic|Y
01|62542|3|3|cable parameter changes travel and labor for|Y
01|62542|3|4|installing one 5AX table with scales on a one YASDA VMC|Y
01|62545|1|1|Table with Okuma motor.|Y
01|62545|4|1|Confirmation switches and solenoid added to tailstock.|Y
01|62545|4|2|20' of wiring will be included with the switches.|Y
01|62546|1|1|200MM 4th & 5th axis table with installation kit for|Y
01|62546|1|2|the Brother S300X1 machine.|Y
01|62548|2|1|Low profile rotary union.|Y
01|62548|5|1|Low profile rotary union.|Y
01|62564|3|1|TWIN SPINDLE TABLE INCLUDES SERV MOTORS AND HYDRAULIC|Y
01|62564|3|2|FOR BRAKE SYSTEM|Y
01|62564|5|1|HYDRAULIC PANCAKE CYLINDER MODIFICATION TO HYD UNIT|Y
01|62564|5|2|MANIFOLD AND PRSSURE SWITCH CYLINDER|Y
01|62564|7|1|FLEX COLLET CHUCK(65 SERIES) COLLET AND ADAPTER PLATE|Y
01|62564|7|2|NO THRU HOLE|Y
01|62568|1|1|ETA 2 WEEKS FROM THE TIME OF ORDER|Y
01|62571|5|1|PLEASE SEE TABLE SPECS ATTACHED|Y
01|62571|7|1|3 + 1 ROTARY UNION (TCD-A3334/1) NEEDED. SEE ATTACHED|Y
01|62576|2|1|TABLE SUPPLIED WITH SERVO MOTORS CONNECTORS|Y
01|62576|2|2|TABLE TO BE SET UP THE SAME AS EXISTING TABLE WITH|Y
01|62576|2|3|S/N 1540. TABLE IS STOCK 1 WEEK OR LESS TO CONFIGURE|Y
01|62592|1|1|Daewoo Model DMV 3016|Y
01|62592|1|2|Parameter changes to be provided|Y
01|62592|1|3|Delivery 1-2 weeks|Y
01|62592|1|4|Fanuc A4i/TS Motor|Y
01|62592|2|1|Rotary Cable connections for Table to Daewoo Dmv3016|Y
01|62592|2|2|Cable Length to be Determined|Y
01|62592|2|3|Schematic will be needed for cabling|Y
01|62604|2|1|External calbes for 5AX-2MT Fanuc ($1550 per axis)|Y
01|62606|1|1|2pcs stock remaining bal ETA approx 11/10|Y
01|62610|1|1|This package includes the Shrink Fit Unit and Cooling|Y
01|62610|1|2|Tower and 10 std CAT40 shrink fit holders.|Y
01|62610|1|3|With the IMTS Promo we have going until the end of the|Y
01|62610|1|4|year they would also get another 5 holders or another|Y
01|62610|1|5|cooling tower at no charge.|Y
01|62611|1|1|Reference RGA# TAR-48922|Y
01|62611|1|2|5AX-130DA21 s/n: 1216H|N
01|62611|17|1|External wire harness rotary axis|Y
01|62611|18|1|Internal wire harness rotary axis|Y
01|62630|1|1|200MM twin spindle table with Fanuc motors.|Y
01|62631|3|1|Installation incldes: Drive unit short bar fiber|Y
01|62631|3|2|optic cable communications cable bulkhead cables|Y
01|62631|3|3|external cables parameter changes service time and|Y
01|62631|3|4|travel.|Y
01|62634|2|1|Installation includes: Bulkhead cable set external|Y
01|62634|2|2|cable set parameter changes service time and travel.|Y
01|62638|1|1|Table without motor.  Motor to be installed by Mazak.|Y
01|62638|2|1|Booster for hydraulic brake on table.|Y
01|62646|1|1|NBT40-SK10C-90G|Y
01|62646|4|1|NBT40-SK13C-90G|Y
01|62646|5|1|SK13-8A|Y
01|62646|6|1|SK13-8P|Y
01|62646|7|1|SK13-8A|Y
01|62646|8|1|NBT40-SK6C-90G|Y
01|62646|11|1|NBT40-SK6C-60G|Y
01|62646|12|1|NBT40-SK6C-60G|Y
01|62646|14|1|NBT40-SK6C-90G|Y
01|62646|17|1|NBT40-SK13C-60G|Y
01|62656|2|1|Modification for 210mm center height|Y
01|62671|1|1|NC5-100-SK16C-105 w/ PS-N100VE installed|Y
01|62677|1|1|Reference RGA# CUR-48968|Y
01|62677|1|2|Nikken C1.1/4 Angle Head Unknown Part Number.|Y
01|62684|2|1|10+pcs required|Y
01|62684|7|1|10+pcs required|Y
01|62684|12|1|10+pcs required|Y
01|62687|1|1|Table with Fanuc motor.|Y
01|62687|3|1|External cables for CNC105 2.3 meters long|Y
01|62691|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|62709|3|1|C50RAM-ER40-215IC-110TP>>> Mimatic 185675|Y
01|62709|3|2|Internal Coolant|Y
01|62739|2|1|Installation includes: Dual axis drive unit short bars|Y
01|62739|2|2|fiber optic cables communications cables bulkhead|Y
01|62739|2|3|cable sets external cable sets parameter changes|Y
01|62739|2|4|service time and travel.|Y
01|62742|1|2|HFO Tampa to supply correct motors|Y
01|62742|1|3|HFO Tampa to supply cables|Y
01|62742|7|1|six jaw manual chuck w/adapter plate|Y
01|62755|1|1|Includes NSVZ180FA-M with Fanuc motor no external|Y
01|62755|1|2|cables are included hydraulic brake hydraulics need|Y
01|62755|1|3|to be provided|Y
01|62755|3|1|Includes drive unit bulkhead cables external cables|Y
01|62755|3|2|short bar fiber optic cable communications cable|Y
01|62755|3|3|parameter changes labor travel|Y
01|62768|4|1|Discount reflects Core Trade In.|Y
01|62792|1|1|Service call for CNC180ZA s/n: 20726T to be completed|Y
01|62792|1|2|by Pedro Suarez - Lyndex-Nikken|Y
01|62792|2|1|Transit Time: 1 Hour Roundtrip: $90.00|Y
01|62792|2|2|Meal Charge: $35.00 per day|Y
01|62792|3|1|Minimum of 2 hours labor.  Any additional labor will|Y
01|62792|3|2|be charged at $120.00 per hour.|Y
01|62798|1|1|Reference RGA# LVR-48895|Y
01|62798|1|2|OKU-L470-Z (OKL4-ER40Z) s/n: AL285|N
01|62798|3|1|Bearings seals and o-rings are worn and must be|Y
01|62798|3|2|replaced. Collet nut must also be replaced. Labor is|Y
01|62798|3|3|included.|Y
01|62809|1|1|Discount reflects purchase order of 1 to 24 holders|Y
01|62809|1|2|Delivery: 3 stk/18 1~2 wks/Bal 13 wks|Y
01|62809|2|1|Discount reflects purchase order of 25 to 49 holders.|Y
01|62809|2|2|Delivery: 3 stk/18 1~2 wks/Bal 13 wks|Y
01|62809|3|1|Discount reflects purchase order of 50 to 74 holders.|Y
01|62809|3|2|Delivery: 3 stk/18 1~2 wks/Bal 13 wks|Y
01|62809|4|1|Discount reflects purchase order of 75 plus holders|Y
01|62809|4|2|Delivery: 3 stk/18 1~2 wks/Bal 13 wks|Y
01|62809|7|1|Discount reflects purchase order of 1 to 24 holders.|Y
01|62809|7|2|Delivery: 2 stk/14 1~2 wks/Bal 13 wks|Y
01|62809|8|1|Discount reflects purchase order of 25 to 49 holders.|Y
01|62809|8|2|2 stk/14 1~2 wks/Bal 13 wks|Y
01|62809|9|1|Discount reflects purchase order of 50 to 74 holders.|Y
01|62809|9|2|2 stk/14 1~2 wks/Bal 13 wks|Y
01|62809|10|1|Discount reflects purchase order of 75 plus holders.|Y
01|62809|10|2|2 stk/14 1~2 wks/Bal 13 wks|Y
01|62809|11|1|Delivery: 5 stk/14 pc 1~2 wks/Bal 13 wks|Y
01|62809|13|1|Delivery: 1 stk/15 pcs 1~2 wks/Bal 13 wks|Y
01|62811|1|1|MBT40-C25-90G|Y
01|62813|1|1|Installation includes: Drive unit installation and|Y
01|62813|1|2|parameter changes.|Y
01|62814|2|1|Installation includes: Dual axis drvie unit short bars|Y
01|62814|2|2|fiber optic cables communications cables bulkhead|Y
01|62814|2|3|cables  external cables parameter changes service|Y
01|62814|2|4|time and travel.|Y
01|62819|4|1|Includes: drive amp bulk head cable to cabinet set|Y
01|62819|4|2|fiber optic cable communication cable|Y
01|62819|4|3|travel and labor for installation.|Y
01|62819|4|4|Machine Data sheet required|Y
01|62819|8|1|Lyndex Nikken Tool Certificate $ 1000.00 value include|Y
01|62833|1|1|Only taking 1 cooling station with this machine|Y
01|62833|5|1|*pot for additional cool station|Y
01|62835|1|1|H63F-SF1000-3.00|Y
01|62835|1|2|HSK63F  1 Shrink Fit Holder w 3.00 G.L.|Y
01|62837|1|1|Reference RGA# TOR-48705|Y
01|62837|1|2|CAT40-C1.1/4-105U|N
01|62840|1|1|Reference RGA# TOR-48974|Y
01|62840|1|2|CAT40-NPU8-80U|N
01|62850|1|1|Alternative for ZKG12-NO.10U which replaces ZK12-NO.10U|Y
01|62854|1|1|1.00 NOSE DIAMETER|Y
01|62854|1|2|5.00 PROJECTION|Y
01|62854|2|1|1.38 NOSE DIAMETER|Y
01|62854|2|2|5.00 PROJECTION|Y
01|62854|4|1|1.00 NOSE DIAMETER|Y
01|62854|4|2|9.00 PROJECTION|Y
01|62854|5|1|1.38 NOSE DIAMETER|Y
01|62854|5|2|9.00 PROJECTION|Y
01|62854|7|1|DUAL CONTACT (TaperPlus)|Y
01|62854|7|2|1.38 NOSE DIAMETER|Y
01|62854|7|3|5.00 PROJECTION|Y
01|62860|1|1|Reference RGA# TAR-48993|Y
01|62860|1|2|CNC180BFA s/n: 10359|N
01|62862|14|1|STOCK ALTERNATIVE TO H80F-SF1000-2.75B|Y
01|62868|1|1|Reference RGA# TAR-48860|Y
01|62868|1|2|5AX-130ZA s/n: 1119|N
01|62868|41|1|KS-AX123R-ZA214R/0: Rotary Motor Cover|Y
01|62881|6|1|B5006-1750-4.50|Y
01|62881|6|2|1 piece pricing|Y
01|62881|7|1|B5006-1750-4.50|Y
01|62881|7|2|*3 piece minimum|Y
01|62889|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|62904|3|1|Installation includes: Bulkhead cable set external|Y
01|62904|3|2|cable set parameter changes service time and travel.|Y
01|62909|1|1|M32x1.5 Thread|Y
01|62932|1|1|Needs to be able to fit a A25 spindle|Y
01|62932|3|1|2 Free Collets with the purchase of the chuck.|Y
01|62933|14|1|STOCK ALTERNATIVE TO H80F-SF1000-2.75B|Y
01|62936|1|1|Replacement for # HH960C115HE M478 R-Cylinder|Y
01|62936|1|2|Drawing sent with quote.|Y
01|62944|5|1|Net Price Quoted|Y
01|62951|1|1|Price reflects a purchase order of 1 to 2 tap holders.|Y
01|62951|2|1|Price reflects a purchase order of 3 plus tap holders.|Y
01|62955|3|1|TILT AND ROTATION AXIS POWER AND FEEDBACK CABLE SET|Y
01|62955|3|2|CONFIRMATION OF CABLE LENGTH TO BE DETERMINED|Y
01|62959|1|4|Fanuc A4i/TS Motor|Y
01|62968|1|1|Includes shrink fit unit cooling tower 2 HSK32E taper|Y
01|62968|1|2|pots heat induction rings side shelves gloves and|Y
01|62968|1|3|choice of 5 free HSK32E holders or 1 extra cool tower.|Y
01|62968|2|1|Includes shrink fit unit 10 HSK32E holders cooling|Y
01|62968|2|2|tower 2 HSK32E taper pots heat induction rings|Y
01|62968|2|3|gloves and side shelves.|Y
01|62970|1|1|NZ1.1/4-16-125|Y
01|62970|1|2|Nikken Straight Shank Tapping Chuck|Y
01|62970|1|3|Quoted at a net price|Y
01|62977|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|62985|1|1|E16-008AAA ER16 1/8 Collet AAA Grade|Y
01|62985|2|1|E16-118AAA ER16 3.0mm Collet AAA Grade|Y
01|62985|4|1|E16-275AAA ER16 7.0mm Collet AAA Grade|Y
01|63003|1|1|CNC350BFA WITHOUT MOTOR. MOTOR TO BE SUPPLIED BY|Y
01|63003|1|2|ARNOLD. L/N TO INSTALL. AIR/HYD BOOSTER FOR BRAKE|Y
01|63003|3|1|INCLUDES CABLE SET FROM TABLE TO MACHINE BULKHEAD|Y
01|63003|3|2|NEED TO CONFIRM LENGTH|Y
01|63004|3|1|Pricing reflects Net Charge|Y
01|63004|5|1|Pricing reflects Net Charge|Y
01|63016|21|1|NET Price|Y
01|63019|1|1|This item is going to be a CAT40 Shell Mill Holder|Y
01|63019|1|2|3/4 with a 6 gauge length. Neets to be .0002 or|Y
01|63019|1|3|better run out at the nose of the tool.|Y
01|63033|14|1|INSTALLATION INCLUDES 4 + 1 OPERATION|Y
01|63033|14|2|AMPS INCLUDED INNER CABLES EXTERNAL CABLE SET|Y
01|63033|14|3|FIBER OPTICS TRAVEL AND LABOR|Y
01|63034|9|1|INSTALLATION INCLUDES SERVOAMP CABLES FROM BULKHEAD TO|Y
01|63034|9|2|ELECTRICAL CABINET FIBRE OPTIC CABLE CONNECTORS|Y
01|63034|9|3|TRAVEL AND LABOR|Y
01|63042|1|1|Reference RGA# CUR-48991|Y
01|63042|1|2|MNL12-ER11(X)-SUB-SP s/n: NA|N
01|63042|3|1|Gears ER11 Spindle Upper and Lower Housings are|Y
01|63042|3|2|damaged and must be replaced. Bearings seals and|Y
01|63042|3|3|o-rings are also damaged and must be replaced. Labor is|Y
01|63042|3|4|included.|Y
01|63056|2|1|Cut Balluff Chip hole per diagram to service. Hole to|Y
01|63056|2|2|be for chip #BISC12204L requires diam 10mm-H11.|Y
01|63064|1|1|Reference RGA# TAR-48863|Y
01|63064|1|2|5AX-2MT-105-120YA s/n: 8067|N
01|63064|47|1|#2 Rotary spindle is worn and has bearing dimples this|Y
01|63064|47|2|must be re-plated and grounded.|Y
01|63064|47|3|Modification will begin upon receipt of a purchase|Y
01|63064|47|4|order to proceed with repair.|Y
01|63087|2|1|*Modification charge - Net Price|Y
01|63087|5|1|*Modification charge - Net Price|Y
01|63087|5|2|*Qty Break Pricing|Y
01|63106|1|1|J10-5-35|Y
01|63106|1|2|Mfg 11/30|Y
01|63113|2|1|2pcs stock remaining bal ETA approx 11/10/2016|Y
01|63113|3|1|Taper Plus BT30 2.5x6 Blank Bar|Y
01|63113|3|2|NB3008-0006|Y
01|63120|1|1|Reference RGA# QUA-48024|Y
01|63120|1|2|AA21N-CTRL-750|N
01|63120|4|1|Labor is $110/hour pricing reflects half an hour of|Y
01|63120|4|2|labor.|Y
01|63133|2|1|2psc stock remaining bal ETA approx 11/10/2016|Y
01|63133|2|2|Taper Plus BT30 2.5x6.0 Blank Bar|Y
01|63133|3|1|NB3008-0006|Y
01|63136|11|1|THIS TABLE HAS AIR BRAKE.|Y
01|63136|18|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|63136|18|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|63136|18|3|THIS COST DOES NOT INCLUDE ANY PARAMETERS THAT FANUC|Y
01|63136|18|4|MAY NEED TO INSTALL. THIS CANNOT BE DETERMINED TILL|Y
01|63136|18|5|WE RECEIVE MACHINE DATA SHEETS ARE RECEIVED|Y
01|63136|18|6|THERE IS A POSSIBILITY THAT OUR TECH WILL BE ABLE TO|Y
01|63136|18|7|TURN ON.|Y
01|63140|2|1|Custom Positioning Block to be manufactured by Lyndex-|Y
01|63140|2|2|Nikken after approved design drawings.|Y
01|63158|1|1|Cutting Tool Type A Inch for Okuma Multus B200-W|Y
01|63158|1|2|P/N: T129-500-002-96|Y
01|63165|2|1|Currently 3pcs in stock in IL Bal of 1pc ETA pending|Y
01|63169|2|1|Currently 3pcs in stock in IL Bal of 1pc ETA pending|Y
01|63173|2|1|IMTS Promo|Y
01|63173|3|1|IMTS Promo|Y
01|63173|4|1|IMTS Promo|Y
01|63174|1|1|Adapter plate A2-11 is included with Power Chuck|Y
01|63176|1|1|Reference RGA# TOR-49015|Y
01|63176|1|2|BT30-SZF16-105|N
01|63182|1|1|ATC Alignment Tool HSK40A|Y
01|63182|1|2|Please note: Net price quoted.|Y
01|63184|1|1|7pcs stock remaining balance approx 1/12/17|Y
01|63184|2|1|3pc. stock eta approx 12/20|Y
01|63194|1|1|Standard 22.2 rpm.|Y
01|63194|1|2|Motor on right side.|Y
01|63194|1|3|No accessory included.|Y
01|63194|1|4|No Hydraulic Union included.|Y
01|63194|2|1|Special Direct Mount Cable Motor to Electrical Cabinet|Y
01|63199|3|1|included is Atlas air actuated chuck adapter plate|Y
01|63199|3|2|hoses manual lever to open and close|Y
01|63199|7|1|INSTALLATION INCLUDES DRIVE WIRE HARNESS CABLE FROM|Y
01|63199|7|2|SERVO TO BULKHEAD LABOR TRAVEL TRAINING|Y
01|63205|2|1|16C Special Collet 160-1.131|Y
01|63208|2|1|Currently 3pcs in stock in IL Bal of 1pc ETA pending|Y
01|63225|1|1|CAT45-SZF10-90U  CAT45 SK10 Bullseye Chuck 90mm GL|Y
01|63225|2|1|CAT45-SZF10-105U  CAT45 SK10 Bullseye Chuck 105mm GL|Y
01|63225|3|1|CAT45-SZF10-120U  CAT45 SK10 Bullseye Chuck 120mm GL|Y
01|63225|4|1|CAT45-SZF10-165U  CAT545 SK10 Bullseye Chuck 165mm GL|Y
01|63228|8|1|QCFC65 Chuck from SERVICE.|Y
01|63246|1|2|HFO Tampa to supply correct motors|Y
01|63246|1|3|HFO Tampa to supply cables|Y
01|63251|2|1|This version can be run with coolant or completely dry!|Y
01|63251|2|2|This is a unique and exclusive feature to our product!|Y
01|63253|3|1|7-pcs 1~2 Weeks/ Balance Pending|Y
01|63271|1|1|Special CAT40 AngleHead for Mori EcoMill 1100|Y
01|63271|1|2|**3 Pin Support for added Rigidity**|Y
01|63271|1|3|ER16 X 4 Outputs IntC with Ext Coolant Nozzles|Y
01|63271|1|4|Max 8000 RPM 6Nm Torque 66mm BHC 86.5 deg apart.|Y
01|63276|1|2|HFO Tampa to supply correct motors|Y
01|63276|1|3|HFO Tampa to supply cables|Y
01|63293|1|1|Table with Fanuc Motor.|Y
01|63293|2|1|Installation Includes: Drive amp external cable set|Y
01|63293|2|2|short bar fiber optic cable communications cable|Y
01|63293|2|3|parameter changes travel and service labor for|Y
01|63293|2|4|installing one rotary table on one new Toyoda VMC.|Y
01|63293|2|5|***Machine comes with bulkhead cable set***|Y
01|63293|3|1|Manual Tailstock Option|Y
01|63293|4|1|Manual 8 Scroll Chuck Option|Y
01|63296|7|1|Quoted in consideration to E20-295(C)|Y
01|63296|8|1|Quoted in consideration to E20-295(C)|Y
01|63320|1|1|US Machine Company|Y
01|63320|1|2|32940 Janet Ave|Y
01|63320|1|3|Fraser MI 48026|Y
01|63320|1|4|586 294 5670|Y
01|63320|1|5|Att: Chris Steudle|Y
01|63320|1|6|csteudle@usmachine.com|Y
01|63326|1|1|Tooling Certificate Number: 1195-746-022216|Y
01|63327|16|1|#6 Tap not available in ER32|Y
01|63342|2|1|Taper plus BT40 taper 25.4mm shank diameter 90mm GL|Y
01|63354|16|1|#6 Tap|Y
01|63354|17|1|#8 Tap|Y
01|63354|18|1|#10 Tap|Y
01|63354|19|1|#12 Tap|Y
01|63354|20|1|1/4 Tap|Y
01|63354|21|1|5/16 Tap|Y
01|63354|22|1|3/8 Tap|Y
01|63364|1|1|Reference RGA# LVR-49013|Y
01|63364|1|2|NK103-12000 s/n: AL017|N
01|63364|3|1|Collet Nut gears bearings seals and o-rings must|Y
01|63364|3|2|be replaced.  Price includes labor.|Y
01|63388|2|1|BALANCE IN 1-2 WKS|Y
01|63393|1|1|FMM-20.0|Y
01|63393|2|1|FM-25.0|Y
01|63394|2|1|BALANCE IN 1-2 WKS|Y
01|63399|1|1|HSK63F-SK13-70P|Y
01|63401|1|1|stock we have 2 pcs in Illinois|Y
01|63401|2|1|non returnable item|Y
01|63401|2|2|special discount|N
01|63403|1|1|Stock we have 2pcs in Illinois balance at factory in|Y
01|63403|1|2|japan|Y
01|63404|3|2|special item|N
01|63404|3|3|spoecial discount|Y
01|63404|5|1|vender back order|Y
01|63410|1|1|1 Year Extended Warranty for 5AX-201SA-BR2-QT/R650|Y
01|63410|1|2|Ordered on Yamazen PO# MP-18724.|Y
01|63418|1|1|xxxxx|Y
01|63424|1|1|test test|Y
01|63424|1|2|test training|N
01|63424|1|3|new training|Y
01|63426|1|1|Delv = 13 pcs 1 week & balance - pending|Y
01|63438|1|1|NBT40-SZF10C-120 SK10 Series Bullseye Holder with|Y
01|63438|1|2|120mm gage length.|Y
01|63440|1|1|2-Step Reversible Hard Jaws to fit Howa HO1MA28-32 Chck|Y
01|63440|1|2|2 holes 8620 1 set=3 jaws 3W x 4H x 7.25L|Y
01|63440|1|3|includes 2-holed T Nuts w/bolts|Y
01|63451|1|1|Quoted at a net price|Y
01|63451|1|2|Non-cancellable and non-returnable after purchase|Y
01|63451|1|3|order has been placed.|Y
01|63455|1|1|Quoted at a net price|Y
01|63455|1|2|Pricing per 1pc of 10pc insert set|Y
01|63460|1|1|ZK12-1/4U  now ZKG12-1/4U|Y
01|63483|1|1|Balance in 12 Weeks ARO|Y
01|63483|2|1|ETA 12 Weeks ARO|Y
01|63488|2|1|NBT40-FMA25.4-90|Y
01|63497|1|1|Shrink Fit Machine Package Option - 15 Holders for FREE|Y
01|63497|3|1|15 FREE Holders from Shrink Fit Machine Package.|Y
01|63497|4|1|Customer requested 27 pcs total these are the rest|Y
01|63497|4|2|after the free holders were deducted.|Y
01|63504|1|1|Reference RGA# TOR-49062|Y
01|63504|1|2|C5005-0875-5.66|N
01|63504|5|1|Labor rate is $110.00/hour.|Y
01|63504|5|2|Pricing reflects 1.5 hours of labor.|Y
01|63504|7|1|C50S5-1375-5.75|N
01|63504|10|1|Labor rate is $110.00/hour.|Y
01|63504|10|2|Pricing reflects 1.5 hours of labor.|Y
01|63509|1|1|Delv = 12pcs 2 wks & balance - pending|Y
01|63521|1|1|Part# A2-8|Y
01|63521|2|1|CHUCK ID BORE 55MM|Y
01|63558|1|1|Net price reflects 1~9 pieces >> HSK63A-SK6C-200P|Y
01|63558|1|2|SK6 Hi-Speed Holder with 200mm gage length|Y
01|63558|2|1|Net price reflects 10~19 pcs >> HSK63A-SK6C-200P|Y
01|63558|2|2|SK6 Hi-Speed Holder with 200mm gage length|Y
01|63558|3|1|Net price reflects 20~29 pcs>> HSK63A-SK6C-200P|Y
01|63558|3|2|SK6 Hi-Speed Holder with 200mm gage length|Y
01|63558|4|1|Net price reflects 30+ pieces >>HSK63A-SK6C-200P|Y
01|63558|4|2|SK6 Hi-Speed Holder with 200mm gage length|Y
01|63558|6|1|Net price reflects 1~9 pieces >> HSK63A-SK6C-180P|Y
01|63558|6|2|SK6 Hi-Speed Holder with 180mm gage length|Y
01|63558|7|1|Net price reflects 10~19 pcs >> HSK63A-SK6C-180P|Y
01|63558|7|2|SK6 Hi-Speed Holder with 180mm gage length|Y
01|63558|8|1|Net price reflects 20~29 pcs>> HSK63A-SK6C-180P|Y
01|63558|8|2|SK6 Hi-Speed Holder with 180mm gage length|Y
01|63558|9|1|Net price reflects 30+ pieces >>HSK63A-SK6C-180P|Y
01|63558|9|2|SK6 Hi-Speed Holder with 180mm gage length|Y
01|63559|1|1|RJ1S503: Joint Sleeve for TCD-37103|Y
01|63574|4|1|Custom Positioning Block manufactured by Lyndex-Nikken|Y
01|63574|4|2|based on specs provided by Aisin.|Y
01|63574|4|3|ETA would be aprox 48 hrs after receipt of signed|Y
01|63574|4|4|design approval drawings from Aisin.|Y
01|63584|1|1|qtuote as net price or 10%|Y
01|63586|1|1|Additional 10% discount|Y
01|63593|1|1|Price reflects a purchase order of 1 to 2 tap holders.|Y
01|63593|2|1|Price reflects a purchase order of 3 plus tap holders.|Y
01|63638|4|1|no charge for first order of Bullseys|Y
01|63658|1|1|Reference RGA# CUR-49080|Y
01|63658|1|2|CAT50U-AFC1.1/4-230-90 s/n: ACL-08874|N
01|63673|1|1|Includes shrink fit unit 10 standard HSK40E holders|Y
01|63673|1|2|and accessories.|Y
01|63685|1|1|MZQT5-CT40Z-ICE-100  Mazak 90 deg CAT40 Output|Y
01|63685|1|2|Internal/External Coolant L1 = 100mm - special|Y
01|63685|1|3|same as standard but smaller L1 dimension|Y
01|63685|2|1|MZQT5-CT40Z-ICE-100 Mazak 90 Deg CAT40 Output|Y
01|63685|2|2|Internal/External Coolant L1 = 100mm-special|Y
01|63685|2|3|same as standard but smaller L1 dimension|Y
01|63688|5|1|HSK50A-SK16C-135  SK16 Slim Chuck with 135mm Gage|Y
01|63688|5|2|Net Price quoted 1~9 pieces|Y
01|63688|5|3|This holder is considered special once a purchase order|Y
01|63688|5|4|is placed it cannot be cancelled or returned.|Y
01|63688|6|1|HSK50A-SK16C-135  SK16 Slim Chuck with 135mm Gage|Y
01|63688|6|2|Net Price quoted 10~19 pieces.|Y
01|63688|6|3|This holder is considered special once a purchase order|Y
01|63688|6|4|is placed it cannot be cancelled or returned.|Y
01|63688|8|1|HSK50A-SK16C-150  SK16 Slim Chuck with 150mm Gage|Y
01|63688|8|2|Net Price quoted 1~9 pieces.|Y
01|63688|8|3|This holder is considered special once a purchase order|Y
01|63688|8|4|is placed it cannot be cancelled or returned.|Y
01|63690|1|1|OPTION #1|Y
01|63690|3|1|OPTION #2|Y
01|63690|5|1|Installation Includes: Drive Amp bulkhead cable set|Y
01|63690|5|2|external cable set communication cable fiber optic|Y
01|63690|5|3|cable parameter changes travel and labor for|Y
01|63690|5|4|installing one 5AX table on one new Doosan DNM4500 VMC.|Y
01|63714|6|1|*Previously CN103R007|Y
01|63715|1|1|Original net price was $296.69. We have adjusted the|Y
01|63715|1|2|net price to $324.69 adding $28.00 each for overage|Y
01|63715|1|3|on tooling certificate 25000-867-111116 for $56.00.|Y
01|63726|2|1|1pc Stock - balance = discontinued|Y
01|63729|2|1|1 FREE PULL STUD W/ PURCHASE OF ANY CAT50 HOLDER|Y
01|63744|1|1|Reference RGA# TAR-49041|Y
01|63744|1|2|5AX-130ZA s/n: 3145|N
01|63760|1|1|Shrink Fit Machine Package Option - 15 Holders for FREE|Y
01|63760|3|1|15 FREE Holders from Shrink Fit Machine Package.|Y
01|63760|3|2|IMTS 2016 Special|Y
01|63760|4|1|Customer requested 27 pcs total these are the rest|Y
01|63760|4|2|after the free holders were deducted.|Y
01|63765|1|1|Reference RGA# TOR-49079|Y
01|63765|1|2|W1205-0875-6.3(C)|N
01|63765|4|1|Labor is $110.00/hour.|Y
01|63765|4|2|Pricing reflects 1.5 hours of labor.|Y
01|63770|3|1|replacement of CNC321A21|Y
01|63784|3|1|CAT50-C32-200U|Y
01|63784|4|1|CAT50-C32-250U|Y
01|63784|6|1|CAT50-C1.1/4-200U|Y
01|63784|7|1|CAT50-C1.1/4-250U|Y
01|63789|4|1|*3 gage length|Y
01|63789|5|1|*3 gage length|Y
01|63789|6|1|*3 gage length|Y
01|63789|29|1|*Adjust Qty of Ret Knobs to match tool holders|Y
01|63789|29|2|*FREE!|Y
01|63789|60|1|*B5006-0500-3.00 Balanceable|Y
01|63789|61|1|*B5016-0500-6.00 Balanceable   6 Gage|Y
01|63789|62|1|*B5016-0625-6.00 Balanceable   6 Gage|Y
01|63789|65|1|4.33 Gage - Coolant Through|Y
01|63789|66|1|4.92 Gage length non-coolant|Y
01|63789|69|1|*B5016-0750-6.00 Balanceable   6 Gage|Y
01|63789|70|1|*B5016-0875-6.00 Balanceable   6 Gage|Y
01|63791|1|1|Delivery:|Y
01|63791|1|2|10pcs Stock / 10pcs delivery = 12/20 and|Y
01|63791|1|3|5pcs = 10 weeks from purchase date order.|Y
01|63798|1|1|AA21N-CTRL-750 Nikken A Alpha21 control with power cord|Y
01|63798|1|2|and pendant.|Y
01|63798|4|1|M-code installation. Machine must have available M-code|Y
01|63815|2|1|Custom Positioning Block Manufactured by Lyndex-Nikken|Y
01|63815|2|2|based on specs proveded by Nordson.|Y
01|63815|2|3|ETA would be aprox 48 hrs after reciept of signed|Y
01|63815|2|4|design approval drawings from Nordson|Y
01|63822|1|1|180MM table for the Brother S700X1 machine.|Y
01|63827|1|1|with nut SKN-25BJ|Y
01|63830|1|1|Delivery:|Y
01|63830|1|2|10pcs Stock & 30pcs = confirming ETA|Y
01|63843|1|1|320MM table with Haas Sigma 5 motor and cable set|Y
01|63895|2|1|BALANCE DUE EARLY JANUARY|Y
01|63895|3|1|BALANCE DUE 10 WEEKS ARO|Y
01|63896|1|1|CORE TRADE IN PROMOTIONAL DISCOUNT|Y
01|63897|3|1|1pc stock currently more available in 6.30 Gauge|Y
01|63897|3|2|Length|Y
01|63904|1|1|Tooling Certificate Number: 13435-868-111516|Y
01|63909|3|1|This is cost for doing the table modifications one at a|Y
01|63909|3|2|time.  They would cost $400 NET each trip/table|Y
01|63909|3|3|2 trips total|Y
01|63909|5|1|This cost is for doing both the table modifications at|Y
01|63909|5|2|the same time.  Sending both tables on one trip would|Y
01|63909|5|3|be one $500 NET charge.  1 trip total|Y
01|63919|1|1|CAT40-C3/4-70U-IDU-RP CAT40 3/4 Milling Chuck 70mm GL|Y
01|63919|1|2|With Rust Proof|Y
01|63919|1|3|Net price reflects 1~50 pieces.|Y
01|63919|3|1|NMTB40-C3/4-70-RP  NMTB40 3/4 Milling Chuck 70mm GL|Y
01|63919|3|2|With Rust Proof|Y
01|63919|3|3|Net price reflects 1~10 pieces.|Y
01|63919|5|1|CAT40-SK25-90U-IDU-RP Slim Chuck SK25 90mm G/L|Y
01|63919|5|2|With Rust Proof|Y
01|63919|5|3|Net price reflects 1~50 pieces.|Y
01|63919|14|1|SK25-1/2A-RP Collet with Rust Proof|Y
01|63919|14|2|Net price reflects 1~50 pieces|Y
01|63919|15|1|SK25-3/4A-RP Collet with Rust Proof|Y
01|63919|15|2|Net price reflects 1~50 pieces.|Y
01|63919|16|1|SK25-25.4-RP Collet with Rust Proof|Y
01|63919|16|2|Net price reflects 1~50 pieces|Y
01|63919|17|1|KM3/4-1/2-RP Collet with Rust Proof|Y
01|63919|17|2|Net price reflects 1~50 pieces.|Y
01|63952|1|1|Reference RGA# CUR-49082|Y
01|63952|1|2|BT50-NX4-192|N
01|63965|1|1|This NIKKEN 5AX-201FA-M IS DUPLICATE OF S/N 5148|Y
01|63965|1|2|1 PC 5AX-201FA-M TO TO BE EXCHANGED FOR|Y
01|63965|1|3|5AX-350FA-M UNUSED IN CRATE AT JTEKT|Y
01|63965|3|1|Ship to JTEKT -Do Not Assemble to Rotary Table|Y
01|63965|4|1|Ship to JTEKT -Do Not Assemble to Rotary Table|Y
01|63965|5|1|Ship to JTEKT -Do Not Assemble to Rotary Table|Y
01|63965|6|1|Ship to JTEKT -Do Not Assemble to Rotary Table|Y
01|63965|7|1|Ship to JTEKT -Do Not Assemble to Rotary Table|Y
01|63970|2|1|All collets from this set are in stock except|Y
01|63970|2|2|ET32-220|Y
01|63975|1|1|This NIKKEN 5AX-201FA-M IS DUPLICATE OF S/N 5148|Y
01|63983|1|1|Includes table and Fanuc motor|Y
01|63983|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|63983|2|2|external cable set fiber optic cable communication|Y
01|63983|2|3|cable parameter changes travel and labor for|Y
01|63983|2|4|installing one rotary table on one new Toyoda Wele|Y
01|63983|2|5|AQ1465 machine.|Y
01|63985|2|1|Includes dual axis drive unit cabling labor travel|Y
01|63985|2|2|expenses|Y
01|63995|1|1|P/N: T129-500-002-96|Y
01|63995|1|2|Alps Tool for Multus B200-W|Y
01|63996|4|1|Net price reflects non returnable positioning block.|Y
01|64027|1|1|Reference RGA# TAR-49067|Y
01|64027|1|2|5AX-201MA s/n: 5495|N
01|64027|6|1|Expedite Fee to have table completed within one week|Y
01|64039|13|1|HSK80F/LPM-SZF16-110  SK16 Bullseye Holder w/110 gage|Y
01|64039|13|2|Net price reflects special tool once a purchase|Y
01|64039|13|3|order is placed it cannot be cancelled or returned.|Y
01|64039|13|4|Delivery is based upon receipt of approval drawing|Y
01|64039|13|5|which we will provide once a purchase order is received|Y
01|64039|15|1|HSK80F/LPM-SZF25-110  SK25 Bullseye Holder w/110 gage|Y
01|64039|15|2|Net price reflects special tool once a purchase|Y
01|64039|15|3|order is placed it cannot be cancelled or returned.|Y
01|64039|15|4|Delivery is based upon receipt of approval drawing|Y
01|64039|15|5|which we will provide once a purchase order is received|Y
01|64042|2|1|Collets do not collapse|Y
01|64043|1|1|SP165748 Split Inductor Stop Ring >>>Drawing Attached|Y
01|64043|1|2|Quoted as 1 ~ 20 Pieces|Y
01|64044|14|1|Parlec#5003-TRKC|N
01|64046|1|1|A20-A35|Y
01|64046|2|1|A20-A35|Y
01|64046|3|1|A20-A35|Y
01|64046|3|2|2pcs stock remaining balance ETA aprox 12-14 weeks|Y
01|64046|4|1|A20-A35|Y
01|64046|5|1|A20-A35|Y
01|64046|5|2|40pcs stock remaining balance ETA aprox 12-14 weeks|Y
01|64046|6|1|A20-A35|Y
01|64046|7|1|A20-A35|Y
01|64046|8|1|A20-A35|Y
01|64046|9|1|A20-A35|Y
01|64046|9|2|6pcs stock remaining balance ETA aprox 12-14 weeks|Y
01|64046|10|1|A20-A35|Y
01|64046|10|2|5pcs stock remaining balance ETA aprox 12-14 weeks|Y
01|64046|11|1|A20-A35|Y
01|64046|12|1|A20-A35|Y
01|64046|12|2|5pcs stock remaining balance ETA aprox 12-14 weeks|Y
01|64046|13|1|A20-A35|Y
01|64046|13|2|15pcs stock remaining balance ETA aprox 12-14 weeks|Y
01|64046|15|1|A20-A35|Y
01|64046|16|1|A20-A35|Y
01|64046|17|1|A20-A35|Y
01|64046|17|2|CAT50-C1-8.00|Y
01|64046|17|3|ETA aprox 12-13 weeks|Y
01|64046|17|4|This product is given in terms of NET price This is a|Y
01|64046|17|5|special and is not returnable or cancelable upon firm|Y
01|64046|17|6|reciept of PO.|Y
01|64046|18|1|A20-A35|Y
01|64046|18|2|CAT50-C1-200|Y
01|64046|18|3|ETA aprox 12-13 weeks|Y
01|64046|18|4|This product is given in terms of NET price. This|Y
01|64046|18|5|product is special and is not returnable or cancellable|Y
01|64046|18|6|upon firm reciept of PO.|Y
01|64046|19|1|A20-A35|Y
01|64046|20|1|A20-A35|Y
01|64046|20|2|CAT50-C3/4-8.00|Y
01|64046|20|3|ETA aprox 12-14 weeks|Y
01|64046|20|4|This product is given in terms of NET price|Y
01|64046|20|5|This product is a special and is not returnable or|Y
01|64046|20|6|cancellable upon firm reciept of PO|Y
01|64046|21|1|A20-A35|Y
01|64046|21|2|CAT50-C3/4-200|Y
01|64046|21|3|ETA aprox 12-13 weeks|Y
01|64046|21|4|This product is given in terms of NET price|Y
01|64046|21|5|This prodcut is special and is not returnable or|Y
01|64046|21|6|cancellable upon firm reciept of PO#|Y
01|64046|22|1|A20-A35|Y
01|64046|23|2|A20-A35|Y
01|64046|24|1|A20-A35|Y
01|64046|25|1|A20-A35|Y
01|64046|26|1|A20-A35|Y
01|64046|27|1|A20-A35|Y
01|64046|27|2|1 SHANK NO COLLET|Y
01|64046|28|1|A20-A35|Y
01|64046|29|1|A20-A35|Y
01|64046|30|1|A20-A35|Y
01|64046|31|1|A20-A35|Y
01|64046|32|1|A20-A35|Y
01|64046|33|1|A20-A35|Y
01|64046|34|1|A20-A35|Y
01|64046|35|1|A20-A35|Y
01|64046|35|2|1 SHANK NO COLLET NEEDED|Y
01|64046|36|1|A20-A35|Y
01|64046|37|1|A20-A35|Y
01|64046|38|1|A20-A35|Y
01|64046|39|1|A20-A35|Y
01|64046|40|1|A20-A35|Y
01|64046|41|1|A20-A35|Y
01|64046|42|1|A20-A35|Y
01|64046|43|1|A20-A35|Y
01|64046|44|1|A20-A35|Y
01|64046|45|1|A20-A35|Y
01|64046|45|2|MUST CONSIDER COOLANT NUT|Y
01|64046|46|1|A20-A35|Y
01|64046|48|1|A20-A35|Y
01|64046|49|1|A20-A35|Y
01|64046|51|1|A20-A35|Y
01|64046|53|1|A20-A35|Y
01|64046|54|1|A20-A35|Y
01|64046|55|1|A20-A35|Y
01|64046|56|1|A20-A35|Y
01|64046|57|1|A20-A35|Y
01|64046|58|1|A20-A35|Y
01|64046|59|1|A20-A35|Y
01|64046|61|1|A20|Y
01|64046|62|1|A20|Y
01|64046|63|1|A20|Y
01|64046|64|1|A20|Y
01|64046|65|1|A20|Y
01|64046|66|1|A20|Y
01|64046|67|1|A20|Y
01|64046|68|1|A20|Y
01|64046|69|1|A20|Y
01|64046|70|1|A20|Y
01|64046|71|1|A20|Y
01|64046|72|1|A20|Y
01|64046|73|1|A20|Y
01|64046|74|1|A20|Y
01|64046|75|1|A20|Y
01|64046|76|1|A20|Y
01|64046|77|1|A20|Y
01|64046|77|2|1 tool shank no collet|Y
01|64046|78|1|A20|Y
01|64046|79|1|A20|Y
01|64046|80|1|A20|Y
01|64046|81|1|A20|Y
01|64046|82|1|A20|Y
01|64046|83|1|A20|Y
01|64046|84|1|A20|Y
01|64046|85|1|A20|Y
01|64046|86|1|A20|Y
01|64046|87|1|A20|Y
01|64046|88|1|A20|Y
01|64046|89|1|A20|Y
01|64046|90|1|A20|Y
01|64046|92|1|A20|Y
01|64046|94|1|A35|Y
01|64046|95|1|A35|Y
01|64046|96|1|A35|Y
01|64046|97|1|A35|Y
01|64046|98|1|A35|Y
01|64046|99|1|A35|Y
01|64046|100|1|A35|Y
01|64046|101|1|A35|Y
01|64046|102|1|A35|Y
01|64046|103|1|A35|Y
01|64046|104|1|A35|Y
01|64046|105|1|A35|Y
01|64046|106|1|A35|Y
01|64046|107|1|A35|Y
01|64046|108|1|A35|Y
01|64046|108|2|1 shank no collet|Y
01|64046|109|1|A35|Y
01|64046|109|2|1 shank no collet|Y
01|64046|110|1|A35|Y
01|64046|111|1|A35|Y
01|64046|112|1|A35|Y
01|64046|113|1|A35|Y
01|64046|114|1|A35|Y
01|64046|115|1|A35|Y
01|64046|116|1|A35|Y
01|64046|117|1|A35|Y
01|64046|118|1|A35|Y
01|64046|119|1|A35|Y
01|64046|120|1|A35|Y
01|64046|121|1|A35|Y
01|64046|122|1|A35|Y
01|64046|123|1|A35|Y
01|64046|124|1|A35|Y
01|64046|125|1|A35|Y
01|64046|126|1|A35|Y
01|64046|127|1|A35|Y
01|64046|128|1|A35|Y
01|64046|129|1|A35|Y
01|64046|130|1|CAT50-C3/4-8.00|Y
01|64046|130|2|Direct Chuck|Y
01|64046|130|3|A35|Y
01|64046|131|1|A35|Y
01|64046|132|1|A35|Y
01|64046|133|1|A35|Y
01|64046|134|1|A35|Y
01|64046|135|1|A35|Y
01|64046|135|2|3pcs stock remaining balance ETA aprox 7-9 weeks|Y
01|64046|136|1|A35|Y
01|64046|136|2|3/4 direct chuck. No collet|Y
01|64046|137|1|A35|Y
01|64046|138|1|A35|Y
01|64046|139|1|A35|Y
01|64046|140|1|A35|Y
01|64046|141|1|A35|Y
01|64046|142|1|A35|Y
01|64046|143|1|A35|Y
01|64046|144|1|A35|Y
01|64046|145|1|A35|Y
01|64046|146|1|A35|Y
01|64046|147|1|CAT50-C1-8.00|Y
01|64046|147|2|1 shank direct chucking. No collet.|Y
01|64046|148|1|A35|Y
01|64046|149|1|A35|Y
01|64046|149|2|3/4 shank direct chucking. No collet needed.|Y
01|64046|150|1|A35|Y
01|64046|152|1|A35|Y
01|64046|153|1|A35|Y
01|64046|154|1|A35|Y
01|64046|155|1|A35|Y
01|64046|156|1|A35|Y
01|64046|157|1|A35|Y
01|64046|158|1|A35|Y
01|64046|159|1|A35|Y
01|64046|160|1|A35|Y
01|64046|161|1|A35|Y
01|64046|161|2|1.1/4 shank direct chucking. No collet needed.|Y
01|64046|162|1|A35|Y
01|64046|163|1|A35|Y
01|64046|164|1|A35|Y
01|64046|165|1|A35|Y
01|64046|166|1|A35|Y
01|64046|167|1|A35|Y
01|64046|168|1|A35|Y
01|64046|169|1|A35|Y
01|64046|170|1|A35|Y
01|64046|171|1|A35|Y
01|64046|172|1|A35|Y
01|64046|174|1|A35|Y
01|64046|175|1|A35|Y
01|64046|177|1|A35|Y
01|64092|1|1|P/N: OKU-LT15-X  Okuma ER40 A573-26515 Alps OK107-10000|Y
01|64093|1|1|TABLE TO BE LAID ON IT'S BACK|Y
01|64093|2|1|Booster for hydraulic brake.|Y
01|64137|1|1|Table with Fanuc motor and AIR brake.|Y
01|64137|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|64137|2|2|external cable set communication cable fiber optic|Y
01|64137|2|3|cable parameter changes travel and labor for|Y
01|64137|2|4|installation of one 5AX table on one Makino PS95|Y
01|64141|5|1|Quoted at net price|Y
01|64141|5|2|Conversion of CAT50-SF12-80>>CAT50-SF12-80CP|Y
01|64141|7|1|Added 150 net to price for coolant port mod.|N
01|64141|7|2|Modification of CAT50-SF8-80>>CAT50-SF8-80CP|Y
01|64141|8|1|Quoted at a net price|Y
01|64143|4|1|Non-returnable Non-cancellable|Y
01|64143|5|1|Non-returnable Non-cancellable|Y
01|64151|1|1|Quoted at a net price|Y
01|64154|1|1|Delivery can be up to 10-12WK|Y
01|64179|3|1|Note:|Y
01|64179|3|2|This is a demo unit and sold as is|Y
01|64183|4|1|105MM center heigth with Morse Taper #3|Y
01|64218|3|1|Installation includes: Dual axis drive unit short bar|Y
01|64218|3|2|fiber optic cablescommunications cables bulkhead|Y
01|64218|3|3|cables external cables parameter changes service|Y
01|64218|3|4|time and travel.|Y
01|64223|3|1|Installation Includes: JUNCTION BOX FOR CONNECTORS|Y
01|64223|3|2|COMING FROM ROTARY AND MACHINCE ELECTRICAL CABINET|Y
01|64223|3|3|DOES NOT INCLUDE ANY ADDITIONAL CABLES DRIVES PRE|Y
01|64223|3|4|WIRING. PER DISCUSSION AND E-MAIL THIS IS ALREADY DONE|Y
01|64227|1|1|Balance delivery pending.|Y
01|64251|5|1|Previously IMK08-010|Y
01|64251|6|1|prevoiously IMK08-016(C)|Y
01|64260|1|1|Includes motor and cable set.|Y
01|64271|3|1|Quoted at a net price|Y
01|64272|5|1|Installation includes:Single axis drive unitshort bar|Y
01|64272|5|2|fiber optic cable communications cable bulkhead|Y
01|64272|5|3|cables external cables parameter changes service|Y
01|64272|5|4|time and travel.|Y
01|64283|3|1|48-53|Y
01|64291|4|1|Quoted for consideration. This item reduces a system#3|Y
01|64291|4|2|holder to be able to hold system #2 collets|Y
01|64308|1|1|Quoted at a net price|Y
01|64308|3|1|Quoted at a net price|Y
01|64326|4|1|TO CONVERT EXISTING CNCZ-100-2WYA-M TO FA-M FOR SAMSUNG|Y
01|64326|4|2|TABLE WILL NEED TO BE SHIPPED BACK TO LYNDEX NIKKEN FOR|Y
01|64326|4|3|CONVERSION|Y
01|64326|5|1|REFER TO NEW WIRE HARNESS NEEDED|Y
01|64379|10|1|*100mm gl no longer available|Y
01|64379|10|2|*Replace with 80mm|Y
01|64379|11|1|*100mm gl no longer available|Y
01|64379|11|2|*Replace with 80mm|Y
01|64379|12|1|*100mm gl no longer available|Y
01|64379|12|2|*Replace with 80mm|Y
01|64384|3|1|2pcs stock remaining balance ETA aprox 2 weeks|Y
01|64396|11|1|NK103-38000 Live Tooling for Nakamura Radial Straight|Y
01|64396|12|1|NK103-76000 Live Tool for Nakamura Axial Opposite Face|Y
01|64396|12|2|Driven|Y
01|64426|1|1|Quoted at a net price|Y
01|64426|2|1|Quoted at a net price|Y
01|64429|1|1|table with Fanuc motors.|Y
01|64429|2|1|Installation Includes: Drive amp bulk head cable set|Y
01|64429|2|2|external cable sets communication cable fiber optic|Y
01|64429|2|3|cable parameter changes travel and labor for|Y
01|64429|2|4|installing one 5AX table on one Hwacheon Vesta 660 VMC.|Y
01|64434|1|1|Tooling Certificate Number: 1195-876-112316 for $7700.|Y
01|64438|1|1|Tooling Certificate #13485-872-111816|Y
01|64458|5|2|DELIVERY 3-4 WEEK (OR BETTER)AIR DIRECT TO AZIMUTH|Y
01|64458|5|3|FROM FACTORYY|Y
01|64458|7|1|$ 10000.00 FACE VALUE TOOL CERT (NO CHARGE)|Y
01|64485|1|1|Quoted at a net price|Y
01|64485|2|1|Quoted at a net price|Y
01|64507|2|1|Quoted at a net price|Y
01|64534|9|1|Quoted in consideration to requested item SKG-16L|Y
01|64551|4|1|Installation Kit Includes: Drive amp bulkhead cable|Y
01|64551|4|2|set external cable set communication cable fiber|Y
01|64551|4|3|optic cable and short bar.|Y
01|64551|4|4|Samsung option|Y
01|64551|6|1|External cables for CNC202FA-M.|Y
01|64551|6|2|For RoboDrill option.|Y
01|64595|3|1|Customer is really looking forward to receive|Y
01|64595|3|2|this - it's a big order for a new customer|Y
01|64596|3|1|Items backorders for 3 weeks|Y
01|64610|2|1|PROMO PRICE WITH PURCHASE OF MATCHING HOLDER|Y
01|64619|1|1|Reference RGA# TOR-49077|Y
01|64619|1|2|CAT50-UMT200UH|N
01|64621|1|1|Tool 6|Y
01|64621|2|1|Tool 6|Y
01|64621|3|1|Tool Number 10|Y
01|64621|4|1|Tool Number 10|Y
01|64621|5|1|Tool Number 34|Y
01|64621|6|1|Tool Number 34|Y
01|64621|7|1|Tool Number 15|Y
01|64621|8|1|Tool Number 15|Y
01|64621|9|1|Tool Number 35|Y
01|64621|10|1|Tool Number 35|Y
01|64621|11|1|Tool Number 36|Y
01|64621|12|1|Tool Number 36|Y
01|64621|13|1|Tool Number 7|Y
01|64621|14|1|Tool Number 7|Y
01|64621|15|1|Tool Number 33|Y
01|64621|17|1|Tool Number 5|Y
01|64621|18|1|Tool Number 5|Y
01|64621|19|1|Tool Number 8|Y
01|64621|20|1|Tool Number 8|Y
01|64621|22|1|Tool Number 1|Y
01|64621|22|2|ETA aprox 1-2 weeks|Y
01|64621|23|1|Tool Number 1|Y
01|64621|24|1|Tool Number 2|Y
01|64621|24|2|ETA aprox 1-2 weeks|Y
01|64621|25|1|Tool Number 2|Y
01|64621|26|1|Tool Number 11|Y
01|64621|26|2|ETA aprox 1-2 weeks|Y
01|64621|27|1|Tool Number 11|Y
01|64621|28|1|Tool Number 3|Y
01|64621|28|2|ETA aprox 1-2 weeks|Y
01|64621|29|1|Tool Number 3|Y
01|64621|30|1|Tool Number 4|Y
01|64621|30|2|ETA aprox 1-2 weeks|Y
01|64621|31|1|Tool Number 4|Y
01|64621|32|1|Tool Number 46|Y
01|64621|32|2|ETA aprox 1-2 weeks|Y
01|64621|33|1|Tool Number 46|Y
01|64621|34|1|Tool Number 37|Y
01|64621|35|1|Tool Number 37|Y
01|64621|36|1|Tool Number 38|Y
01|64621|37|1|Tool Number 38|Y
01|64621|38|1|Tool Number 39|Y
01|64621|39|1|Tool Number 39|Y
01|64621|40|1|Tool Number 41|Y
01|64621|41|1|Tool Number 41|Y
01|64621|42|1|Tool Number 42|Y
01|64621|43|1|Tool Number 42|Y
01|64621|44|1|Tool Number 43|Y
01|64621|45|1|Tool Number 43|Y
01|64621|46|1|Tool Number 44|Y
01|64621|47|1|Tool Number 44|Y
01|64621|48|1|Tool Number 56|Y
01|64621|49|1|Tool Number 56|Y
01|64621|50|1|Tool Number 45|Y
01|64621|51|1|Tool Number 45|Y
01|64621|52|1|Tool Number 58|Y
01|64621|52|2|ETA aprox 1-2 weeks|Y
01|64621|53|1|Tool Number 58|Y
01|64621|54|1|Tool Number 59|Y
01|64621|54|2|ETA aprox 1-2 weeks|Y
01|64621|55|1|Tool Number 59|Y
01|64621|56|1|Tool Number 48|Y
01|64622|1|1|Tooling Certificate Number: 1055-621-050515|Y
01|64622|2|1|S32-UMTX Straight Shank Universal Micro Touch 32MM|Y
01|64622|2|2|This item cannot be cancelled or returned|Y
01|64622|4|1|SY32-120 32MM Centering Holder|Y
01|64622|4|2|This item cannot be cancelled or returned|Y
01|64622|5|1|BAL-20  Ball Centralizer|Y
01|64622|5|2|This item cannot be cancelled or returned|Y
01|64625|1|1|15pcs stock remaining balance ETA aprox 2 weeks.|Y
01|64632|1|1|Reference RGA# TOR-49125|Y
01|64632|1|2|PF-2|N
01|64645|1|1|Reference RGA# CUR-49128|Y
01|64645|1|2|CAT40U-NX5-153|N
01|64652|2|1|Will collapse to 1mm|Y
01|64655|1|1|HSK63F-NPU8-120|Y
01|64655|1|2|HSK63F Taper Drill Chuck w 120mm gage length NO makino|Y
01|64655|1|3|pin|Y
01|64655|2|1|HSK63F-NPU13-135|Y
01|64655|2|2|HSK63F Taper Drill Chuck w 135mm gage length NO makino|Y
01|64655|2|3|pin|Y
01|64673|1|1|Tool Number 24|Y
01|64673|2|1|Tool Number 24|Y
01|64673|3|1|Tool Number 10|Y
01|64673|4|1|Tool Number 10|Y
01|64673|5|1|Tool Number 11|Y
01|64673|6|1|Tool Number 11|Y
01|64673|7|1|Tool Number 12|Y
01|64673|8|1|Tool Number 12|Y
01|64673|9|1|Tool Number 18|Y
01|64673|10|1|Tool Number 18|Y
01|64673|11|1|Tool Number 13|Y
01|64673|12|1|Tool Number 13|Y
01|64673|13|1|Tool Number 14|Y
01|64673|14|1|Tool Number 14|Y
01|64673|15|1|Tool Number 15|Y
01|64673|16|1|Tool Number 15|Y
01|64673|17|1|Tool Number 19|Y
01|64673|18|1|Tool Number 19|Y
01|64673|19|1|Tool Number 16|Y
01|64673|20|1|Tool Number 16|Y
01|64673|21|1|Tool Number 20|Y
01|64673|21|2|ETA aprox 1-2 weeks|Y
01|64673|22|1|Tool Number 20|Y
01|64673|23|1|Tool Number 21|Y
01|64673|24|1|Tool Number 21|Y
01|64673|25|1|Tool Number 22|Y
01|64673|25|2|ETA aprox 1-2 weeks|Y
01|64673|26|1|Tool Number 22|Y
01|64674|1|1|TWIN SPINDLE TABLE W/MELDAS MOTORS (NOT FANUC)|Y
01|64674|3|1|HYDRAULIC UNIT FOR TAILSTOCK AND CHUCK|Y
01|64674|16|1|FULL 4TH AXIS INSTALLATION ON HARDINGE V1000|Y
01|64674|16|2|PLEASE CONFIRM CORRECT CABLES|Y
01|64695|1|1|250MM Direct drive table with bulkhead cable set and|Y
01|64695|1|2|external cable set.|Y
01|64695|2|1|260MM table with bulkhead cable set and external cable|Y
01|64695|2|2|set.|Y
01|64695|3|1|Installation includes: Bulkhead cable and external|Y
01|64695|3|2|cable installation parmeter changes service time and|Y
01|64695|3|3|travel.|Y
01|64695|5|1|Conversion includes: Alpha 8is servo motor wireharness|Y
01|64695|5|2|bulkhead cable external cables parameter changes|Y
01|64695|5|3|service time and travel.|Y
01|64698|1|1|500PSI tank and unit for table brake systems.|Y
01|64698|2|1|Charge Includes: Labor and parts for converting one|Y
01|64698|2|2|5AX-201 from air clamp to hyd clamp.  This conversion|Y
01|64698|2|3|must be scheduled ahead of time for a timely return.|Y
01|64702|1|1|Hold Pricing Until March|Y
01|64702|2|1|2-pcs stock after these are sold we need to requote.|Y
01|64702|2|2|Maybe you want to put these on your shelf now.|Y
01|64702|4|1|Tool reflects 2017 pricing|Y
01|64708|3|1|*Coolant Through the Flange - can run dry|Y
01|64713|1|1|350MM Tilt rotary table with Haas motor and cable sets.|Y
01|64714|3|1|HYDRAULIC UNIT FOR TAILSTOCK AND CHUCK|Y
01|64720|2|1|Milling Chuck|Y
01|64720|8|1|Face Mill Arbor|Y
01|64720|10|1|Drill Chuck Adapter|Y
01|64720|12|1|QC30 Morse Taper MT1 Holder|Y
01|64720|13|1|QC30 Morse Taper MT1 Holder|Y
01|64748|2|1|Quoted at a net price|Y
01|64759|2|1|Pro Item|Y
01|64763|1|1|Tooling Certificate Number: 13687-898-122016|Y
01|64767|1|1|CAT50-SF0125-3.15MT|Y
01|64774|3|1|Installation includes: Drive unit short bar fiber|Y
01|64774|3|2|optic cable communications cable bulkhead cables|Y
01|64774|3|3|external cables parameter changes service time and|Y
01|64774|3|4|travel.|Y
01|64779|3|1|Installation includes: Drive unit short bar fiber|Y
01|64779|3|2|optic cable communications cable bulkhead cables|Y
01|64779|3|3|external cables parameter changes service time and|Y
01|64779|3|4|travel.|Y
01|64780|3|1|Installation includes: Drive unit short bar fiber|Y
01|64780|3|2|optic cable communications cable bulkhead cables|Y
01|64780|3|3|external cables parameter changes service time and|Y
01|64780|3|4|travel.|Y
01|64799|1|1|Quoted at a net price.|Y
01|64800|2|1|Quoted at a net price|Y
01|64815|1|1|Tooling Certificate Number:: 13687-873-111816|Y
01|64828|3|1|Wrench quoted for consideration to C5017-1000-5.50|Y
01|64828|6|1|Wrench quoted in consideration to C5017-0750-5.50|Y
01|64831|4|1|Installation Kit Includes: Drive amp bulkhead cable|Y
01|64831|4|2|set external cable set communication cable fiber|Y
01|64831|4|3|optic cable and short bar.|Y
01|64831|4|4|Samsung option|Y
01|64833|1|1|T32213|Y
01|64856|2|1|Quoted at a net price|Y
01|64856|2|2|This item is non-standard stock and considered a|Y
01|64856|2|3|special request.|Y
01|64861|1|1|Reference RGA# TOR-49083|Y
01|64861|1|2|CAT40-C1-105UG|N
01|64861|4|1|Labor is $110/hour. Pricing reflects 1.5 hours of labor|Y
01|64861|5|1|Repair to be covered under warranty.|Y
01|64864|1|1|Tooling Certificate Number: 16475-891-120916|Y
01|64864|4|1|Holders installed with SKN-25BJ coolant nuts.|Y
01|64864|5|1|SKN-25BJ has been installed onto HSK100A-SK25C-145|Y
01|64864|6|1|Holders installed with SKN-16BJ coolant nuts.|Y
01|64864|7|1|SKN-16BJ has been installed on HSK100A-SK16C-150.|Y
01|64864|8|1|Holders installed with SKN-16BJ coolant nuts.|Y
01|64864|9|1|Holders installed with SKN-16BJ coolant nuts.|Y
01|64870|7|1|Tap collet reducer quoted for consideration.|Y
01|64887|1|1|SPECIAL MOTOR COVER PER DISCUSSION. DELIVERY 4-5 WEEKS|Y
01|64891|2|1|Wrench for consideration to BT40-SK16-90|Y
01|64891|3|1|Standard non-coolant nut|Y
01|64891|4|1|Standard non-coolant nut|Y
01|64897|1|1|HFO Tampa to supply motor and Cable|Y
01|64897|1|2|checking availability|Y
01|64898|1|1|Quoted at a net price|Y
01|64898|1|2|2pcs minimum order quantity|Y
01|64906|5|1|4th Axis Trunnion Complete with (2) Self Centering|Y
01|64906|5|2|Vises for A and B load and (4) vise clamps.|Y
01|64914|1|1|Adjustment Bushing for Mori NZL6000|Y
01|64914|1|2|Machined to print out of 4140 PH Material|Y
01|64915|3|1|14mm-20mm|Y
01|64916|2|1|*5pc min required|Y
01|64919|2|1|5C dead lenght pneumatic collet closer.|Y
01|64919|3|1|16C dead lenght pneumatic collet closer.|Y
01|64927|2|1|MANUAL 5C COLLET CHUCK|Y
01|64927|3|1|Pneumatic 5C Collet Chuck|Y
01|64927|6|1|Install Includes: Bulkhead cable set external cable|Y
01|64927|6|2|set communications cable fiber optic cable parameter|Y
01|64927|6|3|changes travel and labor for installing one rotary on|Y
01|64927|6|4|one new VMC. Machine YCM w/fanuc|Y
01|64927|7|1|Free $1K Tooling cert per table good for list price|Y
01|64927|7|2|tool holders.|Y
01|64928|1|1|100MM twin spindle table without motor.|Y
01|64931|3|1|Modified Positioning Block is non standard stock. Once|Y
01|64931|3|2|a purchase order is placed it cannot be cancelled or|Y
01|64931|3|3|returned.|Y
01|64934|1|1|SP165748 Split Inductor Stop Ring >>>Drawing Attached|Y
01|64934|1|2|Net price reflects 10 piece minimum.|Y
01|64934|3|1|SP165748 Split Inductor Stop Ring >>>Drawing Attached|Y
01|64934|3|2|Net price reflects 20 piece minimum order.|Y
01|64934|5|1|SP165748 Split Inductor Stop Ring >>>Drawing Attached|Y
01|64934|5|2|Net price reflects 30+ minimum order.|Y
01|64941|2|1|Custom Positioning Block by Lyndex-Nikken per specs|Y
01|64941|2|2|provided by Cambridge Intl.|Y
01|64952|2|1|Custom Positioning Block by Lyndex-Nikken per specs|Y
01|64952|2|2|provided by Cambridge Intl.|Y
01|64954|10|1|H50E-SF0125-6.30|Y
01|64962|1|1|Part Number: CAT40-HC32-|Y
01|64963|3|1|IMTS Promotion 1pc per matching taper holder|Y
01|64963|3|2|purchased|Y
01|64974|8|1|We do not carry a 7/64 collet without coolant so the|Y
01|64974|8|2|E16-118 .118-.098 will hold 7/64 no coolant.|Y
01|64974|10|1|We do not carry a 15/64 collet without coolant so the|Y
01|64974|10|2|E16-236 .236-.216 will hold 15/64 no coolant.|Y
01|64974|17|1|We do not carry a 37/64 collet without coolant so the|Y
01|64974|17|2|E25-590 .590-.551 will  hold 37/64 no coolant.|Y
01|64981|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|64988|1|1|ETA aprox 12-20-2016|Y
01|64988|3|1|2pcs stock remainin balance ETA aprox 12/20/2016|Y
01|64997|4|1|This product is given in terms of NET PRICE.|Y
01|64997|11|1|This product is given in terms of NET PRICE|Y
01|65009|2|1|Positioning Block for Mazak HMC. All 6 machines are the|Y
01|65009|2|2|same and all 6 blocks will be the same.  Having a|Y
01|65009|2|3|block on every machine will allow the 3 heads to be|Y
01|65009|2|4|used on any of the 6 machines.|Y
01|65009|2|5|SPECIAL ONE TIME PROMO|Y
01|65010|1|1|Discount based upon quantities quoted|Y
01|65020|1|1|Balance ETA late January|Y
01|65020|2|1|Balance ETA 8-10 weeks|Y
01|65020|4|1|Balance ETA 8-10 weeks|Y
01|65020|8|1|Balance ETA mid-late January|Y
01|65042|4|1|Subplate for table+tailstock|Y
01|65047|2|1|Discount based on quantities quoted|Y
01|65051|2|1|Installation includes: Drive unit short bar fiber|Y
01|65051|2|2|optic cable communications cables external cables|Y
01|65051|2|3|parameter changes service time and travel.|Y
01|65062|1|1|Price reflects 1 to 10 pieces|Y
01|65062|2|1|Price reflects 11+ pieces|Y
01|65062|4|1|Price reflects 1 to 10 pieces|Y
01|65062|5|1|Price reflects 11+ pieces|Y
01|65064|1|1|Pricing based on past purchases|N
01|65064|1|2|Advised that price could change for additional pc|N
01|65086|1|1|Reference RGA# TAR-49040|Y
01|65086|1|2|5AX-130ZA s/n: 1689|N
01|65093|3|1|Part # TCE-95443|Y
01|65093|3|2|Power/Signal Cable for CNC260TFA S/N 4168|Y
01|65093|4|1|Steel Braided Option of TCE-95945-1800R|Y
01|65093|4|2|MFG: Japan - ETA 4 Weeks upon Reciept of PO|Y
01|65093|5|1|Steel Braided Option of TCE-95949-1800R|Y
01|65093|5|2|MFG: Japan - ETA 4 Weeks upon Reciept of PO|Y
01|65101|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|65101|2|2|external cable setcommunication cable fiber optic|Y
01|65101|2|3|cable parameter changes travel and labor for|Y
01|65101|2|4|installing one rotary table on one VMC.|Y
01|65146|1|1|Reference RGA# TAR-49008|Y
01|65146|1|2|5AX-250 s/n: 1613|N
01|65161|1|1|Reference RGA# TAR-49078|Y
01|65161|1|2|5AX-350FA-R36 s/n: 3520|N
01|65163|1|1|NBT30-FMB27-45|Y
01|65184|1|1|Z-axis 90 Deg ER25 Miyano Live Tool|Y
01|65184|2|1|Z-Axis 90 Deg ER25 Miyano Live Tool|Y
01|65184|3|1|Z-axis 90 Deg ER25 Miyano Live Tool|Y
01|65184|5|1|Z-Axis 90 Deg ER20 Miyano Live Tool|Y
01|65184|6|1|Z-Axis 90 Deg ER20 Miyano Live Tool|Y
01|65184|7|1|Z-Axis 90 Deg ER20 Miyano Live Tool|Y
01|65203|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|65203|2|2|external cable setcommunication cable fiber optic|Y
01|65203|2|3|cable parameter changes travel and labor for|Y
01|65203|2|4|installing one rotary table on one VMC.|Y
01|65203|4|1|$ 1000 Lyndex Nikken Tool Certificate|Y
01|65203|4|2|To be used for LIST PRICE TOOL ALLOWANCE|Y
01|65205|3|1|Included is Table servo motor and EXTERNAL CABLE SET|Y
01|65214|1|1|P/N: T20132 1 Boring Bar Sleeve|Y
01|65214|2|1|P/N: T20121 3/4 Boring Bar Sleeve|Y
01|65214|3|1|P/N: T20119 5/8 Boring Bar Sleeve|Y
01|65214|4|1|P/N: T20117 1/2 Boring Bar Sleeve|Y
01|65214|5|1|P/N: T20115 3/8 Boring Bar Sleeve|Y
01|65224|1|1|ETA 8-10 WEEKS ARO|Y
01|65224|4|1|BALANCE ETA LATE JANUARY|Y
01|65224|5|1|BALANCE ETA 8-10 WEEKS ARO|Y
01|65224|6|1|ETA 8-10 WEEKS ARO|Y
01|65224|7|1|BALANCE ETA 8-10 WEEKS ARO|Y
01|65224|8|1|ETA 8-10 WEEKS ARO|Y
01|65225|1|1|P/N: AC5-SLA54-80  Capto 5 End Mill Holder 1.255 diam|Y
01|65226|1|1|Tool 6|Y
01|65226|2|1|Tool 6|Y
01|65226|3|1|Tool Number 10|Y
01|65226|4|1|Tool Number 10|Y
01|65226|5|1|Tool Number 34|Y
01|65226|6|1|Tool Number 34|Y
01|65226|7|1|Tool Number 15|Y
01|65226|8|1|Tool Number 15|Y
01|65226|9|1|Tool Number 35|Y
01|65226|10|1|Tool Number 35|Y
01|65226|11|1|Tool Number 36|Y
01|65226|12|1|Tool Number 36|Y
01|65226|13|1|Tool Number 7|Y
01|65226|14|1|Tool Number 7|Y
01|65226|15|1|Tool Number 33|Y
01|65226|17|1|Tool Number 5|Y
01|65226|18|1|Tool Number 5|Y
01|65226|19|1|Tool Number 8|Y
01|65226|20|1|Tool Number 8|Y
01|65226|22|1|Tool Number 1|Y
01|65226|22|2|ETA aprox 1-2 weeks|Y
01|65226|23|1|Tool Number 1|Y
01|65226|24|1|Tool Number 2|Y
01|65226|24|2|ETA aprox 1-2 weeks|Y
01|65226|25|1|Tool Number 2|Y
01|65226|26|1|Tool Number 11|Y
01|65226|26|2|ETA aprox 1-2 weeks|Y
01|65226|27|1|Tool Number 11|Y
01|65226|28|1|Tool Number 3|Y
01|65226|28|2|ETA aprox 1-2 weeks|Y
01|65226|29|1|Tool Number 3|Y
01|65226|30|1|Tool Number 4|Y
01|65226|30|2|ETA aprox 1-2 weeks|Y
01|65226|31|1|Tool Number 4|Y
01|65226|32|1|Tool Number 46|Y
01|65226|32|2|ETA aprox 1-2 weeks|Y
01|65226|33|1|Tool Number 46|Y
01|65226|34|1|Tool Number 37|Y
01|65226|35|1|Tool Number 37|Y
01|65226|36|1|Tool Number 38|Y
01|65226|37|1|Tool Number 38|Y
01|65226|38|1|Tool Number 39|Y
01|65226|39|1|Tool Number 39|Y
01|65226|40|1|Tool Number 41|Y
01|65226|41|1|Tool Number 41|Y
01|65226|42|1|Tool Number 42|Y
01|65226|43|1|Tool Number 42|Y
01|65226|44|1|Tool Number 43|Y
01|65226|45|1|Tool Number 43|Y
01|65226|46|1|Tool Number 44|Y
01|65226|47|1|Tool Number 44|Y
01|65226|48|1|Tool Number 56|Y
01|65226|49|1|Tool Number 56|Y
01|65226|50|1|Tool Number 45|Y
01|65226|51|1|Tool Number 45|Y
01|65226|52|1|Tool Number 58|Y
01|65226|52|2|ETA aprox 1-2 weeks|Y
01|65226|53|1|Tool Number 58|Y
01|65226|54|1|Tool Number 59|Y
01|65226|54|2|ETA aprox 1-2 weeks|Y
01|65226|55|1|Tool Number 59|Y
01|65226|56|1|Tool Number 48|Y
01|65235|5|1|Price includes 10 pieces standard CAT40 holders.|Y
01|65235|7|1|Price includes 10 standard HSK63A shrink fit holders.|Y
01|65237|4|1|1 FREE C50-1500-MORI-EU WITH PURCHASE OF CAT50 HOLDER|Y
01|65243|1|1|Reference RGA# LVR-49055|Y
01|65243|1|2|OK101-79000 s/n: AL001|N
01|65243|3|1|Clutch is damaged and must be replaced. Bearings seals|Y
01|65243|3|2|and o-rings are worn and must be replaced. Labor is|Y
01|65243|3|3|included.|Y
01|65243|5|1|OK101-79000 s/n: AL005|N
01|65243|7|1|Clutch is damaged and must be replaced. Bearings seals|Y
01|65243|7|2|and o-rings are worn and must be replaced. Labor is|Y
01|65243|7|3|included.|Y
01|65249|1|1|Quoted at a net price|Y
01|65253|9|1|Pricing reflects NET modification charge|Y
01|65253|15|1|Pricing reflects NET modification charge|Y
01|65253|18|1|Pricing reflects NET modification charge|Y
01|65255|1|1|Quoted at a net price|Y
01|65259|1|1|RPM 20000|Y
01|65259|4|1|RPM 20000|Y
01|65259|7|1|RPM 20000|Y
01|65259|10|1|RPM 15000|Y
01|65264|1|1|This product is given in terms of NET price.|Y
01|65264|2|1|Information pending from factory.|Y
01|65269|9|1|*Stubby C40S7-0032-1.10 holder|Y
01|65271|3|1|Installation includes: Drive unit short bar fiber|Y
01|65271|3|2|optic cable bulkhead cables external cables|Y
01|65271|3|3|parameter changes service time and travel.|Y
01|65272|5|1|*price ref.|Y
01|65272|6|1|*price ref.|Y
01|65272|7|1|*price ref.|Y
01|65276|5|1|Quoted at a net price|Y
01|65276|5|2|Pricing reflects balancing holder to 30-33k RPM|Y
01|65276|7|1|Quoted at a net price|Y
01|65276|7|2|Pricing reflects balancing holder to 30-33k RPM|Y
01|65277|1|1|Quoted at a net price|Y
01|65280|2|1|500PSI tank and unit for table brake systems.|Y
01|65280|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|65280|3|2|external cable set communication cable fiber optic|Y
01|65280|3|3|cable parameter changes travel and labor for|Y
01|65280|3|4|installing one 5AX table on one new Doosan VMC.|Y
01|65281|1|1|Need to receive machine e-bill in order to spec out the|Y
01|65281|1|2|correct motor and wiring information table is in stock|Y
01|65281|2|1|Mazak cable set from rotary table to bulkhead or|Y
01|65281|2|2|cabinet customer to specify|Y
01|65305|1|1|K22-SK10-100  22mm Straight Shank SK10 collet chuck|Y
01|65305|1|2|with 100mm gage length.|Y
01|65305|2|1|K22-SK10-120  22mm Straight Shank SK10 collet chuck|Y
01|65305|2|2|with 100mm gage length.|Y
01|65305|3|1|K22-SK06-120  22mm Straight Shank SK06 collet chuck|Y
01|65305|3|2|with 120mm gage length.|Y
01|65311|1|1|2.50 Gage Length (with nut assembled)|Y
01|65311|11|1|*Pre-balanced to run max 18000RPM|Y
01|65311|11|2|**Standard stocked item|Y
01|65318|1|1|Reference RGA# TAR-49222|Y
01|65318|1|2|5AX-130DA21 s/n: 1216H|N
01|65318|4|1|Freight charges to schedule expedited shipment of|Y
01|65318|4|2|customer's 5AX-130DA21 s/n: 1216H to Lyndex-Nikken.|Y
01|65318|4|3|This has been waived as a one-time courtesy.|Y
01|65318|4|4|Reference RGA# TAR-49222.|Y
01|65318|4|5|5AX-130DA21 s/n: 1216H|Y
01|65329|1|1|Reference RGA# Q-48453|Y
01|65329|1|2|MNL12-ER40Z-MS s/n: A0034|N
01|65329|3|1|Gears collet nuts bearings seals and o-rings must|Y
01|65329|3|2|be replaced.|Y
01|65329|3|3|Delivery will be 1-2 weeks from the receipt of a|Y
01|65329|3|4|purchase order.|Y
01|65336|1|1|Discount reflects purchase of 1 to 5 holders.|Y
01|65336|2|1|Discount reflects purchase of 6 to 10 holders.|Y
01|65336|3|1|Discount reflects purchase of 15+ holders.|Y
01|65336|6|1|Discount reflects purchase of 1 to 6 collets.|Y
01|65336|7|1|Discount reflects purchase of 7 to 12 collets|Y
01|65336|8|1|Discount reflects purchase of 13 to 18 collets.|Y
01|65336|9|1|Discount reflects purchase of 1 to 6 collets.|Y
01|65336|10|1|Discount reflects purchase of 7 to 12 collets|Y
01|65336|11|1|Discount reflects purchase of 13 to 18 collets.|Y
01|65336|12|1|Discount reflects purchase of 1 to 6 collets.|Y
01|65336|13|1|Discount reflects purchase of 7 to 12 collets|Y
01|65336|14|1|Discount reflects purchase of 13 to 18 collets.|Y
01|65348|5|1|$2000 Lyndex Nikken Tool Certificate towards tooling|Y
01|65348|5|2|NO CHARGE|Y
01|65349|2|2|9GC22-BD Installed onto BT30-C3/4-75 STD>>HI Speed|N
01|65349|3|1|Quoted for consideration to BT30-C3/4-75G|Y
01|65353|4|1|$ 2000 Lyndex Nikken Tool Certificate for tooling|Y
01|65353|4|2|NO CHARGE|Y
01|65356|1|1|NIKKEN CNCZ-202FA-M WITH SERVO MOTOR AND 3+1 ROTARY UNI|Y
01|65356|1|2|SAME CONFIGURATION AS S/N 12055T|Y
01|65366|1|1|Reference RGA# LVR-49123|Y
01|65366|1|2|T32105 s/n: A0979|N
01|65366|5|1|Core trade-in pricing normal discount is 20%.|Y
01|65366|5|2|Delivery is pending at this time.|Y
01|65369|1|1|If order placed within 24 hours delivery = 2 weeks|Y
01|65369|1|2|If placed after delivery 6 weeks|Y
01|65374|1|1|Reference RGA# TOR-49187|Y
01|65374|1|2|HSK100A-NPU13C-145|N
01|65376|2|1|1 C50-STD-EU FREE WITH EVERY MATCHING CAT50 HOLDER|Y
01|65383|1|1|Reference RGA# TAR-49018|Y
01|65383|1|2|CNC180 s/n: 6034|N
01|65391|1|1|Reference RGA# TOR-49204|Y
01|65391|1|2|CAT50 T/C Holder|N
01|65391|4|1|All parts are a bit dirty and need to be cleaned.|Y
01|65391|4|2|However they seem to be in good condition.|Y
01|65391|4|3|We will need to clean parts and taper portion|Y
01|65391|4|4|re-grease and re-assemble.|Y
01|65391|4|5|Labor is $110.00 per hour; however it will take|Y
01|65391|4|6|1&1/2 hours to complete this repair.|Y
01|65402|11|1|Free with PROMO (1pc per holder purchased)|Y
01|65412|4|1|COMPLETE 4TH & 5TH AXIS EXTERNAL CABLE SET|Y
01|65425|1|1|HSK63E-GSK10C-105P  Hi-Speed Slim Chuck SK10 X 105 Gage|Y
01|65425|2|1|HSK63E-GSK16C-120P  Hi-Speed Slim Chuck SK16 X 120 Gage|Y
01|65428|1|1|Reference RGA# TAR-49203|Y
01|65428|1|2|CNCZ180LFA-M s/n: 6035|N
01|65437|2|1|Delivery is upon receipt of spindle information and|Y
01|65437|2|2|other clearance variances are confirmed.|Y
01|65437|2|3|*net price|Y
01|65443|8|1|Quoted in consideration to 5/64 requested|Y
01|65443|13|1|M4 Tap Collet|Y
01|65451|12|1|This line is referenced at your NET cost|Y
01|65457|2|1|DIN Hole Modification and Slotted Arbor Screw|Y
01|65466|13|1|6.0mm to 5.5mm|Y
01|65466|14|1|5.5mm to 5.0mm|Y
01|65476|1|1|#6 Pin for 5C-CLOSE|Y
01|65479|1|1|2pcs currenlty in stock|Y
01|65479|1|2|Delivery on additional parts will be 2-3 weeks please|Y
01|65479|1|3|note that manufacturer will be closed for the next 2|Y
01|65479|1|4|weeks for the upcoming holidays.  So delivery is|Y
01|65479|1|5|subject to change without notice.|Y
01|65479|2|1|1pc STOCK|Y
01|65490|1|1|Less 35 for Pratt and Whitney|Y
01|65494|6|1|Collet Promotion|Y
01|65500|4|1|Reference RGA# TAR-49104|Y
01|65500|4|2|5AX-350FA-RCN2-RJ6 s/n: 3013|N
01|65500|35|1|Hex Bolts - Part Number Pending|Y
01|65500|36|1|Hex Bolts|Y
01|65511|4|1|Lyndex Nikken would wire and set this replacement table|Y
01|65511|4|2|identical to the CNC-201LFA-M S/N 8537H that was on|Y
01|65511|4|3|the machine originally. So there would be only paramete|Y
01|65511|4|4|changes needed. If Lyndex Nikken to send Engineer to|Y
01|65511|4|5|MD for installation a $ 2500.00 charge|Y
01|65512|1|1|Quoted at a net price|Y
01|65513|1|1|Quoted at a net price|Y
01|65513|1|2|Pricing for 1pc|Y
01|65513|2|1|Quoted at a net price|Y
01|65513|2|2|Pricing for 4pcs|Y
01|65528|1|1|Quoted 1~4 tools|Y
01|65528|2|1|Quoted 5~10 tools.|Y
01|65528|3|1|Quoted 11~45 tools.|Y
01|65528|5|1|Quoted 1~4 tools|Y
01|65528|6|1|Quoted 5~10 tools.|Y
01|65528|7|1|Quoted 11~45 tools.|Y
01|65546|2|1|Quoted at a net price|Y
01|65546|2|2|Once modified this item would be non-cancellable and|Y
01|65546|2|3|non-returnable|Y
01|65558|1|1|To test CRM Open Quote|Y
01|65580|1|1|Pricing for 1-2pcs|Y
01|65580|1|2|5 total pcs available then this item will be|Y
01|65580|1|3|discontinued|Y
01|65580|2|1|Pricing based on 3-5pcs|Y
01|65580|2|2|5pcs available then this item will be discontinued|Y
01|65592|1|1|1-twin spindle high speed table with installation kit|Y
01|65592|1|2|for Brother R450X1|Y
01|65596|2|1|Delivery is upon receipt of spindle information and|Y
01|65596|2|2|other clearance variances are confirmed.|Y
01|65596|2|3|*net price|Y
01|65602|1|1|AC5-ECH7F-60|Y
01|65602|2|1|AC5-ECH7F-90|Y
01|65612|1|1|Quoted at a net price|Y
01|65618|1|1|Tool Certificate Number 13687-855-101816|Y
01|65624|1|1|1 piece stock 2pcs stock at factory remaining balance|Y
01|65624|1|2|ETA pending factory.|Y
01|65624|14|1|NC5016-1500-6.00|Y
01|65624|14|2|ETA aprox 10-11 weeks|Y
01|65629|3|1|AIR BRAKE QUOTED. PER APPLICATION AIR/HYD BOOSTER MAY|Y
01|65629|3|2|BE RECCOMENDED|Y
01|65629|3|3|PROPER INTERFACE NEEDED FOR EITHER TABLE|Y
01|65637|1|1|HSK63A-16-3.00|Y
01|65637|1|2|HSK63A Taper 16mm end mill holder with a 3 projection|Y
01|65639|1|1|2.36 Gage Length|Y
01|65639|2|1|6.00 Gage Length|Y
01|65639|9|1|*Qty Break pricing of 10+ pricing|Y
01|65643|2|1|*FREE - Qty to match tool holders|Y
01|65651|1|1|Price includes DIN Coolant and slotted arbor screw.|Y
01|65651|2|1|Modification of NC5011-0750-4.00 to DIN Coolant and|Y
01|65651|2|2|coolant arbor screw.|Y
01|65652|1|1|Tooling Certificate Number: 13687-833-083116|Y
01|65663|1|1|Direct mount cable for customer's CNC180MA s/n: 17218.|Y
01|65663|2|1|Interface cable for customer's CNC180MA s/n: 17218.|Y
01|65666|1|1|This live tool has an internal collet nut.|Y
01|65681|2|1|***Net Price***|Y
01|65681|2|2|Special 40mm Riser Block for 170mm Center Height|Y
01|65681|2|3|Fadal 4020 with T-Slot Width: .687 Pitch: 3.75|Y
01|65689|1|1|KM32 Straight Collet|Y
01|65689|1|2|Non-returnable non-cancelable|Y
01|65691|1|1|Non-returnable Non-cancelable|Y
01|65707|1|1|Price quoted as a net by Kyle.|Y
01|65707|2|1|MS110-36020: Long adjustment pin|Y
01|65707|2|2|4pcs = 1 weeks (In stock at manufacturer in US)|Y
01|65707|2|3|6pcs = 2-3 weeks (In stock at manufactuer in Japan)|Y
01|65707|2|4|2pcs = 11-12 weeks|Y
01|65707|2|5|Note that stock quantities may change without notice.|Y
01|65730|1|1|SF-Package Includes 10 holders|Y
01|65730|1|2|IMTS - PROMOTION -->  ADD 5 Holders or Cooling Unit|Y
01|65730|4|1|SF-Package Includes 10 holders|Y
01|65730|4|2|IMTS - PROMOTION --> ADD 5 Holders OR Cooling Unit|Y
01|65730|8|1|ST75-SF0625-8.00|Y
01|65730|8|2|3/4 Straight Shank 5/8 Shrink Fit Ext w 8.00 G.L.|Y
01|65730|9|1|ST75-SF0625-8.00|Y
01|65730|9|2|3/4 Straight Shank 5/8 Shrink Fit Ext w 8.00 G.L.|Y
01|65730|11|1|ST75-SF0625-6.30|Y
01|65730|11|2|3/4 Straight Shank 5/8 Shrink Fit Ext w 6.30 G.L.|Y
01|65751|1|1|For pratt and whitney|Y
01|65771|1|1|Non-returnablenon-cancelable|Y
01|65786|2|1|Install Includes: Drive amp cabling parameter changes|Y
01|65786|2|2|travel and labor for installing one 5AX DD table on|Y
01|65786|2|3|one new Hyundai Wia F400 VMC.|Y
01|65787|2|1|Install Includes: Drive amp cabling parameter changes|Y
01|65787|2|2|travel and labor for installing one 5AX table on|Y
01|65787|2|3|one new Hyundai Wia F400 VMC.|Y
01|65799|1|1|Labor to convert CNC180-FAM table previously sold to|Y
01|65799|1|2|Orchid to Haas with Sigma 1 motor.|Y
01|65806|3|1|Installation inlcudes: Drive unit short bar fiber|Y
01|65806|3|2|optic cable communications cable parameter changes|Y
01|65806|3|3|service time and travel.|Y
01|65812|2|1|This item is not returnable and not refundable.|Y
01|65818|4|1|1pc stock 1pc ETA aprox 1-2 weeks remaining balance|Y
01|65818|4|2|ETA aprox 9-10 weeks|Y
01|65838|1|1|SRM-70.0 Nikken Reamer|Y
01|65838|2|1|SRM-72.7 Nikken Reamer|Y
01|65842|1|1|Reference RGA# LVR-49166|Y
01|65842|1|2|OK101-13000 s/n: AL664|N
01|65842|3|1|Bearings seals and o-rings are worn and must be|Y
01|65842|3|2|replaced. Collet nut must also be replaced. Spindle has|Y
01|65842|3|3|a minor crack this may be able to be reused.|Y
01|65844|1|1|Reference RGA# LVR-49162|Y
01|65844|1|2|T32375 s/n: A0014|N
01|65844|3|1|Bearings seals and o-rings are worn and must be|Y
01|65844|3|2|replaced. Collet nut must also be replaced. Labor is|Y
01|65844|3|3|included.|Y
01|65850|9|1|MZQT47-ER32X-OFF-ICE|Y
01|65850|9|2|Mazak Live X-axis Ver Str ER32 Offset ICE  <V-Type>|Y
01|65852|1|1|Reference RGA# TOR-49197|Y
01|65852|1|2|Oil was sprayed into holder to loosen up gears. Holder|Y
01|65852|1|3|is functioning properly.|Y
01|65871|3|1|Wrench in consideration to drill chucks quoted|Y
01|65892|11|1|Quoted for stock consideration|Y
01|65892|13|1|Quoted for stock consideration|Y
01|65911|1|1|COMPLETE SET FOR CAT40.|Y
01|65911|1|2|UNIT PRICE EACH. SPECIAL ORDER.|Y
01|65911|3|1|UNIT PRICE EACH.|Y
01|65911|3|2|SPECIAL ORDER.|Y
01|65911|4|1|UNIT PRICE EACH.|Y
01|65911|4|2|SPECIAL ORDER.|Y
01|65911|5|1|UNIT PRICE EACH.|Y
01|65911|5|2|SPECIAL ORDER.|Y
01|65911|12|1|#40-TB40-300|Y
01|65911|12|2|40 TAPER TEST BAR W/O FLANGE 300mm|Y
01|65911|12|3|SPECIAL ORDER. UNIT RPICE EACH|Y
01|65950|1|1|S-NC5-63-FMA25.4C-55 w/PS-N63VE pull stud installed and|Y
01|65950|1|2|customer provided Sumitomo cutter added and balanced|Y
01|65950|1|3|at Nikken.|Y
01|65950|1|4|Labor for cutter addition and balancing at Nikken is|Y
01|65950|1|5|included in price.|Y
01|65952|1|1|Reference RGA# TOR-49256|Y
01|65952|1|2|PF-2|N
01|65968|1|1|Quoted at a net price|Y
01|65970|1|1|Quoted at a net price|Y
01|65976|2|1|System#1 will need collets|Y
01|65977|6|1|Coolant Arbor Screw for NC4001-0750-1.75|Y
01|65977|8|1|Coolant Arbor Screw for NC4001-1000-1.75|Y
01|65977|10|1|Coolant Arbor Screw for NC4011-1000-4.00|Y
01|65977|13|1|Coolant Arbor Screw for NC4011-0750-4.00|Y
01|65980|6|1|Coolant Arbor Screw for NC4001-0750-1.75|Y
01|65980|8|1|Coolant Arbor Screw for NC4001-1000-1.75|Y
01|65980|10|1|Coolant Arbor Screw for NC4011-0750-4.00|Y
01|65980|12|1|Coolant Arbor Screw for NC4011-1000-4.00|Y
01|65984|1|1|Reference RGA# TAR-49259|Y
01|65984|1|2|CNC202LSA3 s/n: 7091|N
01|65984|31|1|O-Ring: XR0-0130700N735|Y
01|65984|32|1|Seal: XTH-0027100T165|Y
01|65995|9|1|Quoted at a net price|Y
01|66000|1|1|Reference RGA# TOR-49254|Y
01|66000|1|2|CAT40U-NX5-151|N
01|66010|1|1|Reference RGA# TAR-49253|Y
01|66010|1|2|CNC200 s/n: 3527|N
01|66011|1|1|ETA 7-10 DAYS|Y
01|66020|13|2|3pcs Stock|Y
01|66032|3|1|Install Includes: Drive amp cabling parameter changes|Y
01|66032|3|2|travel and labor for install|Y
01|66034|3|1|Cable sets for rotary and tilt axis|Y
01|66050|1|1|2pcs Stock remaining bal ETA aprox 10-12 weeks|Y
01|66050|3|1|This product is given in terms of NET price. This|Y
01|66050|3|2|product is not standard stock and therefore condsidered|Y
01|66050|3|3|special. It is non-returnable and non-refundable upon|Y
01|66050|3|4|placement of PO|Y
01|66056|1|1|Tooling Certificate Number: 13687-833-083116|Y
01|66063|2|1|Install Includes: Drive amp bulkhead cable set|Y
01|66063|2|2|external cable sets communication cable fiber optic|Y
01|66063|2|3|cable parameter changes travel and labor for|Y
01|66063|2|4|installing one 5AX table on one new VMC.|Y
01|66064|1|1|Reference RGA# LVR-49266|Y
01|66064|1|2|OKU-L370-X s/n: AL658|N
01|66064|3|1|Spindle shaft has a lot of damage this must be|Y
01|66064|3|2|replaced. Gears are damaged and must be replaced.|Y
01|66064|3|3|Bearings seals and o-rings are worn and must be|Y
01|66064|3|4|replaced. Labor is included.|Y
01|66064|7|1|Spindle shaft has a lot of damage this must be|Y
01|66064|7|2|replaced. Gears are damaged and must be replaced.|Y
01|66064|7|3|Bearings seals and o-rings are worn and must be|Y
01|66064|7|4|replaced. Labor is included.|Y
01|66064|9|1|OKU-L370-X s/n: AL719|N
01|66064|11|1|Spindle shaft has a lot of damage this must be|Y
01|66064|11|2|replaced. Gears are damaged and must be replaced.|Y
01|66064|11|3|Bearings seals and o-rings are worn and must be|Y
01|66064|11|4|replaced. Labor is included.|Y
01|66064|13|1|OKU-L370MW-DB s/n: AL0055|N
01|66064|15|1|Collet nuts must be replaced. Bearings seals and|Y
01|66064|15|2|o-rings are worn and must be replaced. Labor is|Y
01|66064|15|3|included.|Y
01|66076|1|1|This item is given in terms of NET price.|Y
01|66095|5|1|Promotional Pricing|Y
01|66095|6|1|Promotional Pricing|Y
01|66097|4|1|Substitute for C4007-0025-2.50 TEC# 22243 comes with|Y
01|66097|4|2|slotted nut.|Y
01|66101|8|1|One time only special pricing.|Y
01|66110|7|1|INSTALLATION ON AWEA BMI400/50 WITH FANUC Oi-MF|Y
01|66114|5|1|#40-TB40-300|Y
01|66114|5|2|40 TAPER TEST BAR w/o FLANGE 300mm|Y
01|66114|5|3|SPECIAL ORDER. UNIT PRICE EACH. DISCOUNT INCLUDED.|Y
01|66114|6|1|#50-TB50-300|Y
01|66114|6|2|50 TAPER TEST BAR w/o FLANGE 300mm|Y
01|66114|6|3|SPECIAL ORDER. UNIT PRICE EACH. DISCOUNT INCLUDED.|Y
01|66114|7|1|UNIT PRICE. DISCOUNT INCLUDED.|Y
01|66114|8|1|UNIT PRICE. DISCOUNT INCLUDED.|Y
01|66117|2|1|External cables for 5AX table - Both Axes|Y
01|66119|2|1|CONFIRMATION OF FIT TO MACHINE TO BE CONFIRMED|Y
01|66119|2|2|LEFT HAND MODEL AVAILABLE. TABLE COMPLETE WITH SERVO|Y
01|66119|2|3|MOTOR AND CABLES|Y
01|66119|2|4|CNCZ-260BYA-M IS MODEL WITH MOTOR IN BACK/REAR|Y
01|66119|2|5|THIS TABLE LIST PRICE IS $ 24900.00 SAME DISCOUNT AS|Y
01|66119|2|6|ABOVE|Y
01|66129|5|1|#40-TB40-300|Y
01|66129|5|2|40 TAPER TEST BAR w/o FLANGE 300mm|Y
01|66129|5|3|SPECIAL ORDER. UNIT PRICE EACH. DISCOUNT INCLUDED.|Y
01|66129|6|1|#50-TB50-300|Y
01|66129|6|2|50 TAPER TEST BAR w/o FLANGE 300mm|Y
01|66129|6|3|SPECIAL ORDER. UNIT PRICE EACH. DISCOUNT INCLUDED.|Y
01|66129|7|1|UNIT PRICE. DISCOUNT INCLUDED.|Y
01|66129|8|1|UNIT PRICE. DISCOUNT INCLUDED.|Y
01|66131|1|1|Min. 6pcs required|Y
01|66131|2|1|Min. 6pcs required|Y
01|66131|3|1|Min. 6pcs required|Y
01|66131|4|1|Min. 6pcs required|Y
01|66131|5|1|Min. 6pcs required|Y
01|66131|5|2|SPECIAL ORDER. UNIT PRICE EACH. DISCOUNT INCLUDED.|Y
01|66131|6|1|Min. 6pcs required|Y
01|66131|6|2|SPECIAL ORDER. UNIT PRICE EACH. DISCOUNT INCLUDED.|Y
01|66131|7|1|#40-TB40-300|Y
01|66131|7|2|40 TAPER TEST BAR w/o FLANGE 300mm|Y
01|66131|7|3|SPECIAL ORDER. UNIT PRICE EACH. DISCOUNT INCLUDED.|Y
01|66131|7|4|Min. 6pcs required|Y
01|66131|8|1|#50-TB50-300|Y
01|66131|8|2|50 TAPER TEST BAR w/o FLANGE 300mm|Y
01|66131|8|3|SPECIAL ORDER. UNIT PRICE EACH. DISCOUNT INCLUDED.|Y
01|66131|8|4|Min. 6pcs required|Y
01|66131|9|1|Min. 6pcs required|Y
01|66131|10|1|Min. 6pcs required|Y
01|66132|1|1|Normal discount is 20% off list.|Y
01|66132|1|2|This item is currently in stock.|Y
01|66165|1|1|1/4 SERRATED|Y
01|66166|1|1|This item is a non-standard-stock special.|Y
01|66166|1|2|Non-cancellable non-returnable upon receipt of a firm|Y
01|66166|1|3|purchase order.|Y
01|66178|22|1|3J Collet 1.255 round inner diameter.|Y
01|66178|22|2|Minimum 5pcs!|Y
01|66185|3|1|2pcs ETA aprox 3-4 weeks 2pcs ETA pending factory|Y
01|66196|2|1|P/N: C5057-0032-15.00 CAT50 ER32 w 15.00 G.L.|Y
01|66196|3|1|P/N: C5057-0032-15.00|Y
01|66196|4|1|P/N: C5057-0032-15.00|Y
01|66200|1|1|2 pcs ETA 2 Weeks ARO Balance ETA 8-10 Weeks ARO|Y
01|66200|1|2|Stock Alternatives Available|Y
01|66200|2|1|ETA 2 Weeks ARO|Y
01|66200|3|1|ETA 8-10 Weeks ARO - Stock Alternatives Available|Y
01|66208|1|1|INCLUDES SF UNIT + 15 HSK40A HOLDERS|Y
01|66211|1|1|Motor for CNC202LSA3|Y
01|66215|1|1|2 pcs ETA 2 Weeks ARO Balance ETA 8-10 Weeks ARO|Y
01|66215|1|2|Stock Alternatives Available|Y
01|66215|2|1|ETA 2 Weeks ARO|Y
01|66215|3|1|ETA 8-10 Weeks ARO - Stock Alternatives Available|Y
01|66216|28|1|2 pcs ETA 2 Weeks ARO Balance ETA 8-10 Weeks ARO|Y
01|66216|28|2|Stock Alternatives Available|Y
01|66216|30|1|ETA 8-10 Weeks ARO - Stock Alternatives Available|Y
01|66223|1|1|ETA aprox 3-5 working days.|Y
01|66256|8|1|1 pull stud @ $5 with purchase of matching CAT50 holder|Y
01|66262|1|1|5 Del on 02-08-2017;|N
01|66264|2|1|Balance in 1-2 weeks ARO|Y
01|66267|1|1|P/N: CAT50N-MDPE-M16-65U|Y
01|66267|1|2|CAT50 32mm Pro-Endmill Base Holder NON ANSI STD|Y
01|66281|1|1|Tooling Certificate Number: 13687-898-122016|Y
01|66282|1|1|Reference RGA# QUA-49247|Y
01|66282|1|2|SF-START2-UNIT-200 s/n: 2J192|Y
01|66286|1|1|AC6-TC63 Tooljaw Capto C6|Y
01|66286|1|2|Net Price quoted|Y
01|66300|1|1|Reference RGA# QUA-49277|Y
01|66300|1|2|CAT40U-NX5-153|N
01|66340|12|1|NBT30-SK10C-60P-J Coolant Hi-Speed Nuts installed at|Y
01|66340|12|2|Lyndex-Nikken prior to shipping.|Y
01|66340|13|1|NBT30-SK10C-75P-J Coolant Hi-Speed Nuts installed at|Y
01|66340|13|2|Lyndex-Nikken prior to shipping.|Y
01|66340|14|1|NBT30-SK10C-90P-J Coolant Hi-Speed Nuts installed at|Y
01|66340|14|2|Lyndex-Nikken prior to shipping|Y
01|66340|15|1|NBT30-SK16C-60P-J Coolant Hi-Speed Nuts installed at|Y
01|66340|15|2|Lyndex-Nikken prior to shipping.|Y
01|66340|16|1|NBT30-SK16C-90P-J Coolant Hi-Speed Nuts installed at|Y
01|66340|16|2|Lyndex-Nikken prior to shipping.|Y
01|66341|2|1|This item is not returnable or refundable upon firm|Y
01|66341|2|2|reciept of a PO.|Y
01|66341|4|1|This item is not returnable or refundable upon firm|Y
01|66341|4|2|reciept of a PO.|Y
01|66345|37|1|This retention knob can be taken at $5.00 net each with|Y
01|66345|37|2|the purchase of a matching taper holder.|Y
01|66356|36|1|This retention knob is $5.00 net each with the|Y
01|66356|36|2|purchase of the matching taper holder.|Y
01|66363|1|1|This item is not returnable or cancelable upon firm|Y
01|66363|1|2|receipt of a PO.|Y
01|66370|1|1|405-914-0-178 (SENTER)|Y
01|66370|1|2|For Chuck#: H3YS6 R-3801|Y
01|66370|3|1|405-912-0-178 (STOPPER)|Y
01|66370|3|2|For Chuck#: H3YS6 R-3801|Y
01|66373|1|1|NBT30-SK10C-60P-J Coolant Hi-Speed Nuts installed at|Y
01|66373|1|2|Lyndex-Nikken prior to shipping.|Y
01|66373|2|1|NBT30-SK10C-90P-J Coolant Hi-Speed Nuts installed at|Y
01|66373|2|2|Lyndex-Nikken prior to shipping.|Y
01|66373|3|1|NBT30-SK13C-120P-J Coolant Hi-Speed Nuts installed at|Y
01|66373|3|2|Lyndex-Nikken prior to shipping.|Y
01|66373|4|1|NBT30-SK16C-90P-J Coolant Hi-Speed Nuts installed at|Y
01|66373|4|2|Lyndex-Nikken prior to shipping.|Y
01|66373|5|1|NBT30-SK20C-75P-J Coolant Hi-Speed Nuts installed at|Y
01|66373|5|2|Lyndex-Nikken prior to shipping.|Y
01|66378|1|1|Tooling Certificate Number: 5385-894-121516|Y
01|66381|9|1|Balance in 10-12 WEEKS ARO|Y
01|66393|6|1|If order placed within 24 hours delivery within 2 weeks|Y
01|66393|6|2|if placed after delivery 6 weeks|Y
01|66396|4|1|Net Price|Y
01|66396|4|2|Block will be made upon receipt of machine spindle|Y
01|66396|4|3|information|Y
01|66401|4|1|Balance in 10-12 Weeks ARO|Y
01|66402|1|1|7 STOCK 5 FROM NIKKEN|N
01|66402|2|1|20 STOCK FROM NIKKEN|N
01|66402|4|1|10 avail; 2 delivery on 04-24-17|N
01|66402|9|1|4OB (02/08/17)|N
01|66402|10|1|IF ORDER PLACED WITHIN 24HOURS DELIVERY WITHIN 2 WEEKS|Y
01|66402|10|2|IF PLACED AFTER DELIVERY 6 WEEKS|Y
01|66402|22|1|IF ORDER PLACED WITHIN 24HOURS DELIVERY WITHIN 2 WEEKS|Y
01|66402|22|2|IF PLACED AFTER DELIVERY 6 WEEKS|Y
01|66402|22|3|1stock|N
01|66411|1|1|Includes: Mounting motors and cables provided by Mazak|Y
01|66412|1|1|Ref:RGA# TAR-49225|Y
01|66412|1|2|CNCZ202FA sn# 12055T|N
01|66413|1|1|Table with Siemens Motor|Y
01|66413|1|2|WILL NEED ALL MACHINE INFO TO DETERMINE SERVO MOTORS|Y
01|66413|1|3|ALSO WIRING SCHEMATICS FOR EXTERNAL CABLES|Y
01|66413|1|4|CONFIRMATION OF APPLICATION ALSO REQUIRED|Y
01|66413|1|5|DELIVERY 3 WEEKS ARO. INCLUDES EXTERNAL CABLES|Y
01|66413|2|1|Heidenhain Scale Kit and Installation on CNC180|Y
01|66413|2|2|+/_2 ARC SECONDS Acuracy|Y
01|66433|1|1|This product is given in terms of NET price.|Y
01|66435|1|1|Ref:RGA# TAR-49225|Y
01|66435|1|2|CNCZ202FA sn# 12055T|N
01|66438|2|1|IMTS Promo|Y
01|66438|3|1|IMTS Promo|Y
01|66438|4|1|IMTS Promo|Y
01|66446|1|1|Tooling Certificate Number: 25000-903-122216RT|Y
01|66452|4|1|NBT30-SK10C-60P-J Coolant Hi-Speed Nuts installed at|Y
01|66452|4|2|Lyndex-Nikken prior to shipping.|Y
01|66452|5|1|NBT30-SK13C-90P-J Coolant Hi-Speed Nuts installed at|Y
01|66452|5|2|Lyndex-Nikken prior to shipping.|Y
01|66452|6|1|NBT30-SK16C-60P-J Coolant Hi-Speed Nuts installed at|Y
01|66452|6|2|Lyndex-Nikken prior to shipping.|Y
01|66466|1|1|BT50-Z24-187|Y
01|66466|1|2|BT50 Tap Holder Tapping Capability M8~M24 or 1/2~1|Y
01|66466|1|3|Quoted at a net price|Y
01|66466|2|1|ZKG24-1/2P|Y
01|66466|2|2|TAP COLLET .687 Shank X .515 Drive Square|Y
01|66466|2|3|Quoted at a net price|Y
01|66466|3|1|BT50 Side Lock Holder A type Diam 20.0mm|Y
01|66466|3|2|Quoted at a net price|Y
01|66466|4|1|BT50-SCA25.4-135  BT50 Stub Arbor 25.4mm|Y
01|66466|4|2|Quoted at a net price|Y
01|66466|5|1|BT50-RAC180-435  BT50 Balance Cut rac boring arbor|Y
01|66466|5|2|Quoted at a net price|Y
01|66466|6|1|CN08-C8(AC630M) >> L/N# CN08-C8|Y
01|66466|6|2|Quoted as 1 Set/10-pieces in a set/sold in set only.|Y
01|66466|6|3|Quoted at a net price|Y
01|66466|7|1|BT50-BAC180-435  BT50 Balance cut BAC Boring arbor|Y
01|66466|7|2|Quoted at a net price|Y
01|66466|8|1|6MP-E4(ST10-P) >> L/N# 6MP-E4  Insert 6MP|Y
01|66466|8|2|Quoted as 1 Set/10-pieces in a set/sold in set only.|Y
01|66466|8|3|Quoted at a net price|Y
01|66466|9|1|BT50-SLA25-105  BT50 Side lock holder A type Diam 25.0|Y
01|66466|9|2|Quoted at a net price|Y
01|66466|10|1|Same as PS-5031|Y
01|66466|10|2|Pull stud for OKK machine with O-ring S9 face|Y
01|66466|10|3|Ref Pg. 270 Nikken catalog|N
01|66470|2|1|FLASH PROMO:Bethgives5|Y
01|66488|3|1|PRICE AND ETA PENDING FROM FACTORY ON ABOVE ITEM*****|Y
01|66488|10|1|This is the Standard pricing for this retention knob.|Y
01|66497|9|1|25pcs Stock - 10pcs 7 weeks - 5 pcs pending|Y
01|66524|2|1|This line at no charge as part of a promotion|Y
01|66527|7|1|*Substitution for std|Y
01|66527|10|1|*Substitution for std|Y
01|66565|1|1|Modification of customer's 5pcs C5006-1000-4.00 to be|Y
01|66565|1|2|Coolant Port holed. An RGA number would be issued for|Y
01|66565|1|3|return of their pieces to us to modify. Work would take|Y
01|66565|1|4|aproximately 3-5 business days after receipt of the pcs|Y
01|66574|2|1|Modify B5016-1000-6.00 to Coolant Ports|Y
01|66578|1|1|Reference RGA# TOR-49353|Y
01|66578|1|2|CAT50-C3/4-105U|N
01|66591|15|1|Free holder for continued business & for also agreeing|Y
01|66591|15|2|to do a company profile video with us|Y
01|66593|1|1|Special 3J Collet  1.586 Round Smooth|Y
01|66593|2|1|Special 3J Collet 1.586 Round Smooth|Y
01|66616|1|1|Reference RGA# TAR-49297|Y
01|66616|1|2|5AX-130 s/n: 3820|N
01|66625|1|1|Reference RGA# LVR-49266|Y
01|66625|1|2|OKU-L370MW-DB s/n: AL0199|N
01|66625|3|1|Collet nuts must be replaced. Bearings seals and|Y
01|66625|3|2|o-rings are worn and must be replaced. Labor is|Y
01|66625|3|3|included.|Y
01|66625|4|1|OKU-L370MW-DB s/n: AL0199 to be repaired under warranty|Y
01|66625|6|1|OKU-L370MW-DB s/n: AL197|N
01|66625|8|1|Collet nuts must be replaced. Bearings seals and|Y
01|66625|8|2|o-rings are worn and must be replaced. Labor is|Y
01|66625|8|3|included.|Y
01|66625|9|1|OKU-L370MW-DB s/n: AL197 to be repaired under warranty|Y
01|66660|3|1|To be used with ICE tooling only!!!|Y
01|66673|1|1|Reference RGA# TAR-49320|Y
01|66673|1|2|5AX-2002FA s/n: 1526|N
01|66673|49|1|Tilt Axis Wireharness|Y
01|66673|50|1|Rotary Axis Wireharness|Y
01|66694|3|1|INSTALLATION INCLUDES AMP CABLINGEXTERNAL CABLES|Y
01|66694|3|2|FIBRE OPTICS TRAVE LABOR|Y
01|66695|7|1|4TH AND 5TH AXIS NEEDED DUE TO 2 TABLES WITH SEPERATE|Y
01|66695|7|2|SERVO MOTORS.|Y
01|66714|2|1|Special pricing for Slotted Arbor screw should customer|Y
01|66714|2|2|choose for Lyndex-Nikken to switch out to coolant.|Y
01|66714|2|3|Please add this NET COST to your Shell Mill holder's|Y
01|66714|2|4|NET COST when quoting the customer.|Y
01|66714|2|5|No additional discount should be taken from the Arbor|Y
01|66714|2|6|Screw price.|Y
01|66723|1|1|Unit is sold at cost to Ripi per agreement with|Y
01|66723|1|2|Tom Jaenicke.|Y
01|66738|1|1|Price Sheet for Tool Clamper|Y
01|66740|2|1|Positioning Block has Ground Hardened Bushing with|Y
01|66740|2|2|Blank Material for customer to machine.|Y
01|66740|3|1|Lyndex-Nikken to supply complete machined positioning|Y
01|66740|3|2|block specific to the machine.|Y
01|66740|3|3|Customer must provide spindle drawings to L/N to help|Y
01|66740|3|4|with MFG process|Y
01|66755|1|1|CAT40 4-1/8 Diameter Blank Bar w 4.00 G.L.|Y
01|66758|1|1|Tooling Certificate Number: 13712-887-120516|Y
01|66793|6|1|INSTALLATION INCLUDES AMP CABLE HARNES FIBER OPTICS|Y
01|66793|6|2|CONNECTORS TRAVEL LABOR|Y
01|66793|6|3|BOTH TABLE WIOLL OPERATE WITH THE SAME INTERFACE|Y
01|66793|6|4|ONLY PARAMETERS WILL BE NEEDED TO BE CHANGED|Y
01|66794|2|1|*Hex Style Nut|Y
01|66794|2|2|*NKA01-45000 is alternative for NKA01-13000|Y
01|66799|6|1|C4503-0004-1.58|Y
01|66799|6|2|CAT45 JT4 Jacobs Taper Holder|Y
01|66799|7|1|C4503-0004-XXXX|Y
01|66820|3|1|*CP 1/8 SPECIAL --> Delivery 9-11wks *price pending|Y
01|66820|3|2|*Mold Type in stock|Y
01|66820|5|1|*Non-Coolant Port version out of stock. Delv 9-11wks|Y
01|66820|5|2|*Alternative with Coolant Ports|Y
01|66831|6|1|44 pcs stk jpn 1-2 weeks bal 3-4 wks ARO|Y
01|66831|8|1|BT50-C1.1/2-95P-L105|Y
01|66831|13|1|MBT50-C1.1/4-165P-L150|Y
01|66831|14|1|MBT50-C1.1/4-90P-L105|Y
01|66831|14|2|25 PIECE PRICING|Y
01|66831|15|1|MBT50-C1.1/2-95P-L85|Y
01|66831|17|1|KM12-1/8|Y
01|66831|17|2|4 pcs stk jpn bal 8-9wks ARO|Y
01|66831|19|1|BT50-C1.1/4-220P|Y
01|66831|20|1|BT50-C1.1/4-300P-L150|Y
01|66831|21|1|BT50-C1.1/2-300P-L150|Y
01|66833|7|1|These are hi-Speed stock I will sell at standard speed|Y
01|66833|7|2|to clear final stock on shelves. Same 5 GL as the|Y
01|66833|7|3|Standard Speed pieces. Balance of order (28pcs) would|Y
01|66833|7|4|be the Standard speed.|Y
01|66833|10|1|We have 20pcs in current stock here 20pcs ETA 1-2 wks|Y
01|66833|10|2|after receipt of PO and additional 10pcs expected 2/15.|Y
01|66833|10|3|Balance of 8pcs would be aprox 10-12 weeks.|Y
01|66887|2|1|Includes: Fanuc motors on Tilt/Rotary axis.|Y
01|66887|2|2|Hydraulic brake system. Needs hydrauulic unit/pump|Y
01|66887|2|3|Not included: Cable sets Hyd. Rotary cylinders|Y
01|66887|4|1|FEEDBACK CABLE TO BE CONFIRMED FOR TILT AND ROTARY|Y
01|66887|4|2|AXIS|Y
01|66887|6|1|POWER CABLE FOR TILT AND ROTARY AXIS TO BE CONFIRMED|Y
01|66887|12|1|Hydraulic unit for brake. 2 x AC100V solenoids included|Y
01|66887|14|1|INSTALLATION (MACHINE AND CONTROL TO BE DETERMINED|Y
01|66887|14|2|SHOULD NOT AFFECT QUOTE|Y
01|66887|14|3|INSTALLATION INCLUDES HARDWARE INTERNAL CABLES. FIBER|Y
01|66887|14|4|OPTIC CABLEDUAL DRIVE TRAVEL LABOR|Y
01|66887|14|5|MACHINE DATA SHEETS REQUIRED FOR INSTALL|Y
01|66887|14|6|*Optional 4th&5th Axis parameter has to be turn on MTB|Y
01|66889|1|1|Reference RGA# TAR-49259|Y
01|66889|1|2|Inspection fees for CNC202LSA3 s/n: 7091|Y
01|66890|1|1|OKE4-ER40X-ICE|Y
01|66890|1|2|This pricing is given in terms of NET price. Also this|Y
01|66890|1|3|is price is based on 1 piece purchased.|Y
01|66890|3|1|OKE4-ER40X-ICE|Y
01|66890|3|2|This product is given in terms of NET price. Also this|Y
01|66890|3|3|price is based on 2 pieces purchased.|Y
01|66890|5|1|OKE4-ER40Z-ICE|Y
01|66890|5|2|This product is given in terms of NET price. Also this|Y
01|66890|5|3|is price given if 1 piece purchased.|Y
01|66890|7|1|OKE4-ER40Z-ICE|Y
01|66890|7|2|This product is given in terms of NET price. Also this|Y
01|66890|7|3|is price given if 2 pieces are purchased|Y
01|66925|3|1|Modification of face plate: Add pattern provided by|Y
01|66925|3|2|Honda EGA. Includes  program set up amd machining of|Y
01|66925|3|3|face plate in the US.|Y
01|66934|1|1|Customer has existing CNC401 on machine currently.|Y
01|66934|1|2|CNC302 needs to have Alpha 8is Motor to work with|Y
01|66934|1|3|Existing Drive inteface|Y
01|66949|7|1|INSTALLATION INCLUDES DRIVE WIRE HARNESS CABLE FROM|Y
01|66949|7|2|SERVO TO BULKHEAD LABOR TRAVEL TRAINING|Y
01|66963|1|1|Reference RGA# CUR-49332|Y
01|66963|1|2|MNL12-ER11(X)-SUB-SP s/n: NA|N
01|66963|3|1|Spindle is damaged and must be replaced. Bearings|Y
01|66963|3|2|seals and o-rings are worn and must be replaced. Labor|Y
01|66963|3|3|is included.|Y
01|66978|9|1|4TH AXIS INSTALL ECO1035 WITH DDRT INTERFACE ALREADY|Y
01|66978|9|2|INSTALLED.|Y
01|66989|2|1|EXTERNAL CABLES INCLUDED IN INSTALLATION|Y
01|66989|3|1|external cables included|Y
01|66989|5|1|INSTALLATION INCLUDES EXTERNAL CABLES FROM ROTARY TABLE|Y
01|66989|5|2|TO BULKHEAD. MACHINE HAS 4TH AXIS INTERFACE ALREADY|Y
01|66989|5|3|motor to be used alpha/8iF|Y
01|66989|5|5|TABLE WILL HAVE SERVO MOTOR INTERNAL WIRE HARNESS|Y
01|66993|3|1|4pcs stock 6pcs ETA aprox 2/06/2017|Y
01|66994|8|2|nstallation Includes: Drive amp bulkhead cable set|Y
01|66994|8|3|external cable set fiber optic cable communication|Y
01|66994|8|4|cable travle and labor.|Y
01|66994|8|5|instllation will be on DMG MORI VNV5000 machine|Y
01|66994|8|6|optional Axis parameter hs to be turned on MTB|Y
01|67000|1|1|Reference RGA# TOR-49369|Y
01|67000|1|2|#1 NC5-63-SZF16C-105-J|N
01|67000|7|1|#2 NC5-63-SZF16C-105-J|N
01|67000|13|1|#3 NC5-63-SZF16C-105-J|N
01|67013|1|1|This unit comes inclusive with: a cooling turret|Y
01|67013|1|2|cooling brackets spring clips 5pc. induction rings|Y
01|67013|1|3|storage racks.|Y
01|67032|2|1|CAT50-C2-170.3|Y
01|67032|2|2|Special CAT50 2 Milling Chuck w 170.3mm gage length|Y
01|67032|2|3|w -IDI ID Chip Hole w specific location|Y
01|67032|5|1|Modification to install Balluff Chip BIS-C-122-04/L|Y
01|67046|1|1|ETA aprox 11-12 weeks.|Y
01|67059|1|1|Above holder is a special and non cancelable and|Y
01|67059|1|2|non-returnable.|Y
01|67073|1|1|Includes table and motors and air/hyd booster for brake|Y
01|67073|4|1|Support Table Option (will require 50mm riser)|Y
01|67073|5|1|Tailstock Option|Y
01|67074|2|1|Promotional pricing while stock lasts!!!!|Y
01|67074|2|2|24PCS in stock then item will be discontinued.|Y
01|67082|1|1|Package includes: Power and signal & feedback cables|Y
01|67082|1|2|hydraulic unit with solenoid and pressure switches|Y
01|67082|1|3|hose with quick disconnects.|Y
01|67102|2|1|Includes: drive amp bulk head cable set external|Y
01|67102|2|2|cable set fiber optic cable communication cable|Y
01|67102|2|3|travel and labor for installation.|Y
01|67102|2|4|*Optional Axis parameter has to be turn on by|Y
01|67102|2|5|Machine Tool Builder.|Y
01|67112|5|1|1pc available at this price|Y
01|67112|5|2|After sale this item will be discontinued|Y
01|67123|1|1|Quoted at a net price|Y
01|67141|1|1|P/N: C4006-16-8.00|Y
01|67141|1|2|CAT40 16mm End Mill Holder w 8.00 G.L.|Y
01|67141|1|3|8-10wks mfg + 1-2wks ship|Y
01|67145|1|1|BT50-Z24-187|Y
01|67145|1|2|BT50 Tap Holder Tapping Capability M8~M24 or 1/2~1|Y
01|67145|1|3|Quoted at a net price|Y
01|67145|2|1|ZKG24-1/2P|Y
01|67145|2|2|TAP COLLET .687 Shank X .515 Drive Square|Y
01|67145|2|3|Quoted at a net price|Y
01|67145|3|1|BT50 Side Lock Holder A type Diam 20.0mm|Y
01|67145|3|2|Quoted at a net price|Y
01|67145|4|1|BT50-SCA25.4-135  BT50 Stub Arbor 25.4mm|Y
01|67145|4|2|Quoted at a net price|Y
01|67145|5|1|BT50-RAC180-435  BT50 Balance Cut rac boring arbor|Y
01|67145|5|2|Quoted at a net price|Y
01|67145|6|1|CN08-C8(AC630M) >> L/N# CN08-C8|Y
01|67145|6|2|Quoted as 1 Set/10-pieces in a set/sold in set only.|Y
01|67145|6|3|Quoted at a net price|Y
01|67145|7|1|BT50-BAC180-435  BT50 Balance cut BAC Boring arbor|Y
01|67145|7|2|Quoted at a net price|Y
01|67145|8|1|6MP-E4(ST10-P) >> L/N# 6MP-E4  Insert 6MP|Y
01|67145|8|2|Quoted as 1 Set/10-pieces in a set/sold in set only.|Y
01|67145|8|3|Quoted at a net price|Y
01|67145|9|1|BT50-SLA25-105  BT50 Side lock holder A type Diam 25.0|Y
01|67145|9|2|Quoted at a net price|Y
01|67145|10|1|Same as PS-5031|Y
01|67145|10|2|Pull stud for OKK machine with O-ring S9 face|Y
01|67145|10|3|Ref Pg. 270 Nikken catalog|N
01|67152|8|1|Quoted at a net price|Y
01|67156|2|1|HW-SJ-12-HW-1.5S-60|Y
01|67156|2|2|3PCS=1SET|Y
01|67156|2|3|Quoted at a net price|Y
01|67158|28|1|CAT50-Q34-140U|Y
01|67158|31|1|SP34-34-60|Y
01|67164|1|1|HSK40A-SK16-80  Slim Chuck|Y
01|67164|1|2|This tooling is non standard stock. Once a purchase|Y
01|67164|1|3|order is placed it cannot be cancelled or returned.|Y
01|67165|1|1|Quoted at a net price|Y
01|67170|5|1|Crossover for PSC479|Y
01|67171|1|1|*Based on 6 sets purchased|Y
01|67171|3|1|*Based on 7 sets purchased|Y
01|67175|1|1|HSK100A-SM1000-9.00|Y
01|67181|1|1|Table with Fanuc motor.|Y
01|67181|3|1|CABLE KIT|Y
01|67183|1|1|HFO TAMPA TO SUPPLY MOTOR AND CABLES|Y
01|67183|1|2|TABLE AND TAILSTOCK IN STOCK|Y
01|67183|5|1|$ 1000.00 TOOL CERTIFICATE PER TABLE AT NO CHARGE|Y
01|67192|2|1|Quoted for better stock consideration to|Y
01|67192|2|2|BT30-MDSK16-75|Y
01|67193|3|1|2pcs stock remaining balance ETA aprox 3-4 weeks|Y
01|67193|5|1|2pcs stock remaining balance ETA aprox 3-4 weeks|Y
01|67199|2|1|This line is referenced at your NET cost|Y
01|67202|2|1|CNC302OSP3-M WILL BE HYDRAULIC CLAMPING|Y
01|67202|2|2|EXTERNAL CABLE SET INCLUDED|Y
01|67202|4|1|500PSI pump with solenoid pressure switches and hoses|Y
01|67206|2|1|HYDRAULIC BRAKE. EXTERNAL CABLE SET INCLUDED|Y
01|67211|3|1|This is product is given in terms of NET price.|Y
01|67232|1|1|Confirmation of servo motor needed.|Y
01|67232|1|2|Delivery based upon availbility of servo motor|Y
01|67232|1|3|Wiring schematics may be required|Y
01|67232|1|4|No installation included.|Y
01|67236|1|1|WE DO HAVE A DEMO TABLE AVAILABLE. WAS AT IMTS ON|Y
01|67236|1|2|MACHINE. HAS SCRATCH ON FACEPLATE AND CHIPPED PAINT.|Y
01|67236|1|3|COMES WITH 1 YEAR NEW TABLE WARRANTEE|Y
01|67236|1|4|CAN OFFER THIS TABLE WITH 20% DISCOUNT|Y
01|67236|4|1|FULL SET OF EXTERNAL CABLES|Y
01|67236|6|1|INSTALLATION INCLUDES 4TH AND 5TH AXIS DRIVES FIBER|Y
01|67236|6|2|OPTICS CABLES ALL INTERNAL CABLING CONNECTORS|Y
01|67236|6|3|TURNING ON ADDITIONAL AXIS TRAVEL LABOR|Y
01|67236|6|4|FOR 3 DAYS|Y
01|67236|6|5|I|Y
01|67253|2|1|Installation kit including amplifier interface cables|Y
01|67253|2|2|external cables communications cable short bar fiber|Y
01|67253|2|3|optic cable|Y
01|67256|2|5|SPECIAL PRICING PER OUR DISCUSSION|Y
01|67268|1|1|NBT30-SK25C-60-J  TaperPlus BT30 SK25C 60mm GL with|Y
01|67268|1|2|Coolant Nut added    for T1|Y
01|67268|5|1|NBT30-SK25C-120-J  TaperPlus BT30 SK25C 120mm GL with|Y
01|67268|5|2|Coolant Nut added    for T2|Y
01|67268|9|1|NBT30-SK10C-90-J  TaperPlus BT30 SK10C 90mm GL with|Y
01|67268|9|2|Coolant Nut added    for T3|Y
01|67268|13|1|NBT30-SK13C-120-J TaperPlus BT30 SK13C 120mm GL with|Y
01|67268|13|2|Coolant Nut added  for T4 & T5|Y
01|67268|20|1|NBT30-SK25-90-J TaperPlus BT30 SK25C 90mm GL with|Y
01|67268|20|2|Coolant Nut added  for T14|Y
01|67268|24|1|NBT30-SK20C-90-J TaperPlus BT30 SK20C 90mm GL with|Y
01|67268|24|2|Coolant Nut added  for T12|Y
01|67268|28|1|NBT30-SK10C-90-J TaperPlus BT30 SK10C 90mm GL with|Y
01|67268|28|2|Coolant Nut added  for T13|Y
01|67269|1|1|Reference RGA# 49084|Y
01|67269|1|2|Repair of CAT50-C1.1/4-105U|Y
01|67269|1|3|Deliver will be 2-3 weeks due to back ordered parts.|Y
01|67269|11|1|Repair of CAT50-C1.1/4H-105U|Y
01|67269|11|2|Delivery will be 2-3 weeks due to back ordered parts.|Y
01|67271|1|1|KM1.1/4-16.35|Y
01|67277|1|1|2x CAT50-C1.1/4-105U sent in for evalutation have|Y
01|67277|1|2|rust and bearing marks on the OD this is unrepairable.|Y
01|67277|1|3|1x CAT50-C1.1/4-105 is repaiable; however the price is|Y
01|67277|1|4|$324.26 net while to price to replace it $358.15 net ea|Y
01|67277|1|5|1x CAT50-C1.1/4H-105U can also be repaired; however|Y
01|67277|1|6|this is also more cost effective to replaced.|Y
01|67277|1|7|The replacements are currently in stock and ready to|Y
01|67277|1|8|ship upon receipt of a PO.  Repairs would take 2-3|Y
01|67277|1|9|weeks due to parts on back order. We have extended your|Y
01|67277|1|10|discount from 30% to 35% as a courtesy.|Y
01|67285|1|1|Includes unit 2 taper pots cooling unit + accessories|Y
01|67287|2|1|4.368mm|Y
01|67301|1|1|BALANCE ETA 3/20|Y
01|67303|1|1|Unit is no longer in stock delivery is pending.|Y
01|67303|1|4|Disount quoted is for core trade-in.|Y
01|67310|1|1|Reference RGA# TOR-49291|Y
01|67310|1|2|Tool #1 CAT40-UMT200UH|Y
01|67310|1|3|Delivery = 3-5 Business Days|Y
01|67310|3|1|1 HOUR LABOR = $110.00; However this repair will take|Y
01|67310|3|2|1.5 hours of labor = $165.00|Y
01|67310|5|1|Tool #2 CAT40-UMT200UH|Y
01|67310|5|2|Delivery = 3-5 Business Days|Y
01|67310|9|1|Tool #3 CAT40-UMT200UH|Y
01|67310|9|2|Delivery = 3-5 Business Days|Y
01|67310|10|1|New Battery|Y
01|67310|14|1|Tool #4: CAT50-UMT200UH|Y
01|67310|14|2|Delivery = 3-5 Business Days from the receipt of back|Y
01|67310|14|3|ordered parts.|Y
01|67314|1|1|Available with non IDU holder|Y
01|67314|3|1|OB - Delivery on 02-08-2017|Y
01|67334|2|1|Includes: Drive Unit Short Bar Fiber Optic Cable|Y
01|67334|2|2|Communication Cable Bulkhead Cables External Cables|Y
01|67334|2|3|Parameter Change|Y
01|67334|2|4|Service Time and Travel|Y
01|67341|2|1|BALANCE ETA 3/30|Y
01|67343|1|1|NBT30-SK10C-75-J  TaperPlus BT30 SK10C 75mm GL with|Y
01|67343|1|2|Coolant Nut added    for T1 & T7 & T8 & T9|Y
01|67343|2|1|for T1 & T8|Y
01|67343|3|1|for T1 & T8|Y
01|67343|9|1|NBT30-SK25C-105-J  TaperPlus BT30 SK25C 105mm GL with|Y
01|67343|9|2|Coolant Nut added    for T2 & T5|Y
01|67343|10|1|for T2 & T5|Y
01|67343|11|1|for T2 & T5|Y
01|67343|12|1|for T2|Y
01|67343|13|1|for T6|Y
01|67357|2|1|Checking Stock Status.|Y
01|67357|8|1|$ 1000 tool LYNDEX NIKKEN TOOL CERTIFICATE (LIST PRICE|Y
01|67358|2|1|Does not include interface|Y
01|67358|4|1|INCLUDES DUAL AXIS DRIVE/AMPS CABLING CONNECTORS|Y
01|67358|4|2|FIBRE OPTICS CABLES PARAMETERS TRAININGTRAVEL AND|Y
01|67358|4|3|LABOR|Y
01|67358|6|1|$ 2000 LIST PRICE TOOL CERTIFICATE AT NO CHARGE|Y
01|67361|9|1|This line at no charge|Y
01|67365|1|1|Repair of OKL3-ER32Z-OFMS(OKU-L370MW-DB) s/n: AL0066|Y
01|67365|1|2|Reference RGA# LVR-49329|Y
01|67365|2|1|Collet nuts bearings seals and o-rings must be|Y
01|67365|2|2|replaced.  Labor is included in price.|Y
01|67365|2|3|Delivery will be 2-3 weeks from receipt of approval to|Y
01|67365|2|4|proceed.|Y
01|67365|3|1|Quoted as a net by Chris Ward.|Y
01|67368|1|1|Repair of 2x OKL3-ER32Z s/n: AL318 & AL0255|Y
01|67368|1|2|Reference RGA# LVR-49311|Y
01|67368|2|2|Spindle clutch collet nut are severely damaged.|Y
01|67368|2|3|Bearings seals and o-rings are also damaged.|Y
01|67368|2|4|These must all be replaced on both units.|Y
01|67368|2|5|Labor is included in price quoted.|Y
01|67368|4|1|We recommend replacing the existing units as they are|Y
01|67368|4|2|severely damaged.  Price quoted is for Core Trade-In.|Y
01|67382|1|1|Repair of customer's OKLU4-ER50X (OKU-LU45-X) s/n: NA|Y
01|67382|1|2|Reference RGA# LVR-49334|Y
01|67382|2|1|Collet nut bearings seals and o-rings must be|Y
01|67382|2|2|replaced.  Labor is included in the price of repair.|Y
01|67387|1|1|HSK80F-SF16-XXX|Y
01|67387|2|1|HSK63E-SF16-XXX|Y
01|67397|1|1|Installed SKN-16BJ COOLANT NUT*****|Y
01|67400|1|1|*Customer to install onto existing holders|Y
01|67406|8|1|One time only special pricing.|Y
01|67434|1|1|FROM REFURBISHED INVENTORY|Y
01|67435|1|1|CAT50 Right AngleHead to Capto C6 Output|Y
01|67435|1|2|** 3 Pin Support Required **|Y
01|67435|1|3|No Coolant Max 4000 RPM Max 70Nm|Y
01|67435|1|4|Pricing based on 1pc purchased only|Y
01|67435|3|1|CAT50 Right AngleHead to Capto C6 Output|Y
01|67435|3|2|** 3 Pin Support Required **|Y
01|67435|3|3|No Coolant Max 4000 RPM Max 70Nm|Y
01|67435|3|4|Pricing based on 2pcs purchased at same time|Y
01|67462|2|1|Please verify shank and square dimensions above|Y
01|67462|2|2|prior to purchase.|Y
01|67468|1|1|End User Cost $188.00 net.|Y
01|67468|1|2|This is a Hot Deal holder once a purchase order is|Y
01|67468|1|3|placed it cannot be cancelled or returned.|Y
01|67468|2|1|End User Cost $251.00 net.|Y
01|67468|2|2|This is a Hot Deal holder once a purchase order is|Y
01|67468|2|3|placed it cannot be cancelled or returned.|Y
01|67479|1|1|with motor|Y
01|67479|3|1|Height Adjustable from 125 to 135mm|Y
01|67479|5|1|Hardware Kit - Includes servo amp and all cables|Y
01|67479|5|2|Internal and external.|Y
01|67490|5|1|#NCAT40-C3/4-85U-IDU|Y
01|67490|5|2|Pricing reflects converting high speed>std speed|N
01|67490|5|3|milling chuck replacement nut is in stock|N
01|67526|1|1|**Refurb - Sold As-Is**|Y
01|67526|1|2|Non-returnable|Y
01|67526|1|3|Pictures of product has been sent|Y
01|67530|5|1|Also takes wrench#9HC22|Y
01|67530|6|1|Delivery based on conversion from STD>Hi Speed|N
01|67530|6|2|use nut#9GC22-BD|N
01|67530|6|3|Also takes wrench#GH20|Y
01|67536|3|1|Delivery 1 week within confirmation of spindle drawing|Y
01|67536|3|2|*net price|Y
01|67539|15|1|NBT30-SK20C-90P-J|Y
01|67541|2|1|for Mazak Versatech 100N240|Y
01|67541|2|2|Delivery if noted from receipt of PO and spindle|Y
01|67541|2|3|dimensional information|Y
01|67548|1|1|PART-MIM-113674 Special seal for Mimatic Live Tool|Y
01|67548|1|2|part# 184821|Y
01|67559|1|1|Reference RGA# LVR-49132|Y
01|67559|1|2|T32386 s/n: A0004|N
01|67559|3|1|Collet nuts and spindle are damaged and must be|Y
01|67559|3|2|replaced. Bearings seals and o-rings are worn and must|Y
01|67559|3|3|be replaced. Labor is included.|Y
01|67559|5|1|T32386 s/n: A0066|N
01|67559|7|1|Drive shaft is damaged and must be replaced. Bearings|Y
01|67559|7|2|seals and o-rings are worn and must be replaced. Collet|Y
01|67559|7|3|nuts must also be replaced. Labor is included.|Y
01|67579|1|1|Net price includes modification of holder.|Y
01|67579|1|2|Lyndex-Nikken to install SKN-16BJ(GH) coolant nut|Y
01|67579|1|3|Once modified holder is non-returnable.|Y
01|67579|3|1|Net price includes modification of holder.|Y
01|67579|3|2|Lyndex-Nikken to install SKN-25BJ(GH) coolant nut|Y
01|67579|3|3|Once modified holder is non-returnable.|Y
01|67579|4|1|Net price includes modification of holder.|Y
01|67579|4|2|Lyndex-Nikken to install SKN-25BJ(GH) coolant nut|Y
01|67579|4|3|Once modified holder is non-returnable.|Y
01|67606|1|1|Reference RGA# CUR-49381|Y
01|67606|1|2|B50RAM-MI63-225C-110 s/n: 53120-01|N
01|67606|4|1|MI63 threadring assembly is damaged and must be|Y
01|67606|4|2|replaced. Locking adjustment cam bolts must also|Y
01|67606|4|3|be replaced. Labor is included.|Y
01|67623|1|1|OKEX-ER32X-OFF|Y
01|67632|1|1|Reference RGA# TAR-49418|Y
01|67632|1|2|CNCZ180LYABR s/n: 7115|N
01|67636|1|1|Set includes: 2-CNCZ180LSABR2 High Speed rotary tables|Y
01|67636|1|2|electronics and sheet metal divider for the Brother|Y
01|67636|1|3|R450X1.|Y
01|67642|13|1|Replaces WS1730|Y
01|67644|7|1|4TH INTERFACE INCLUDES DRIVE CABLES FIBRE OPTICS|Y
01|67644|7|2|TRAVEL AND LABOR|Y
01|67650|1|1|Warranty replacement for original collet purchased on|Y
01|67650|1|2|Inv# 2127575 1/10/17.  Original collet broke on first|Y
01|67650|1|3|use.  Customer has been instructed to not return the|Y
01|67650|1|4|broken collet.|Y
01|67669|2|1|net price for modification|Y
01|67669|2|2|Coolant Ports a long the pilot w. exit ports on face|Y
01|67675|4|1|EXTERNAL CABLE SET|Y
01|67679|2|1|Machine model to be determined at time of order|Y
01|67679|2|2|Parameter changes to be provided|Y
01|67679|2|3|Delivery 1-2 weeks|Y
01|67679|2|4|Motor to be determined at time of order|Y
01|67681|2|1|includes independent controller. Will need a 2 meter|Y
01|67681|2|2|subplate.|Y
01|67684|14|1|Del: end of Feb. We can ship partial set. It will be|Y
01|67684|14|2|missing E20-006 and E20-004.|Y
01|67687|4|1|Interface kit including drive unit fiber optic cables|Y
01|67687|4|2|short bar|Y
01|67701|3|1|14-pcs 1 week/ 3-pcs ship 2-10/Bal Pending|Y
01|67701|3|2|Can your customer use CAT40-C3/4-85UG? I currently have|Y
01|67701|3|3|15 pcs in stock and balance would be 1~2 weeks.|Y
01|67701|4|1|15 pcs in stock and balance would be 1~2 weeks.|Y
01|67704|1|1|Installed with a USAFED-09 motor specified by customer|Y
01|67718|2|1|Installation includes: Dual axis drive unit short bar|Y
01|67718|2|2|communications cables fiber optic cables bulkhead|Y
01|67718|2|3|cables external cables parameter changes service|Y
01|67718|2|4|time and travel.|Y
01|67718|3|1|$1500.00 Free Tooling Promo|Y
01|67725|1|1|5AX-2MT-105-120 1 table only sets 1 table per|Y
01|67725|1|2|machine for TC-32B Machine|Y
01|67736|1|1|Basic Rebuild (Bearings/Seals/O-Rings)|Y
01|67736|1|2|Labor is included.|Y
01|67736|2|1|Parts to rebuild the brake system (If necessary)|Y
01|67736|3|1|Hard parts to be replaced (If necessary)|Y
01|67739|2|1|Installed on table.|Y
01|67750|1|1|6 projection compared to Kennametal's 5.50|Y
01|67750|4|1|Slower moving style offering extra disc for|Y
01|67750|4|2|balanceable version|Y
01|67760|1|1|Quoted at a net price|Y
01|67760|2|1|Quoted at a net price|Y
01|67769|1|1|Reference RGA# TAR-49396|Y
01|67769|1|2|NSVX400MA s/n: 1066|N
01|67773|1|1|P/N:162848 MI40 Double Angle Head|Y
01|67773|2|1|P/N: 162834 MI40 Angle Head Offset Slim Type|Y
01|67773|3|1|P/N: 155391  MI40-HC12 Adapter Hydraulic Chuck ID12mm|Y
01|67784|2|1|This line is referenced at your NET cost.|Y
01|67785|1|1|Howa Rotary Cylinder Model # HH4CB200|Y
01|67785|1|2|Drawing #: O-2422|Y
01|67785|1|3|Unit price each. Special order.|Y
01|67785|4|1|#50-TB50-300|Y
01|67785|4|2|50 Taper test Bar w/o Flange 300mm|Y
01|67785|4|3|Unit Price Each. Special Order.|Y
01|67795|6|1|Manual tailstock for CNC803FA-M|Y
01|67795|7|1|Subplate for TC-600R to match up to CNC803FA-M center|Y
01|67795|7|2|height delivery 4 weeks|Y
01|67795|8|1|Manual tailstock for CNC601FA-M|Y
01|67805|1|1|Customer requests this 12.00 gage length as special|Y
01|67813|7|1|DISCONTINUED|Y
01|67824|1|1|Howa H09M40 R-3812 for Okuma V100R 6-Jaw Chuck|Y
01|67824|1|2|Due to the size of this chuck we have included the|Y
01|67824|1|3|Air freight with the price shipping direct to|Y
01|67824|1|4|Feldmeier Equipment.|Y
01|67824|3|1|Howa H09M40 R-3812 for Okuma V100R 6-Jaw Chuck|Y
01|67824|3|2|Due to the size of this chuck we have included the|Y
01|67824|3|3|Boat freight into the price shipping direct to|Y
01|67824|3|4|Feldmeier Equipment.|Y
01|67830|2|1|6.00in gauge length|Y
01|67833|2|1|*Sub at special pricing.  Balanceable version '|Y
01|67833|5|1|*Sub at special pricing.  Balanceable version '|Y
01|67834|3|1|Above blank block is for customer to machine|Y
01|67834|4|1|Above modified block is custom made @ Net charge|Y
01|67856|1|1|HSK125A-C3/4-153  HSK125A taper 3/4 Mill Chuck 153mmGL|Y
01|67856|2|1|HSK125A-C3/4-153  HSK125A taper 3/4 Mill Chuck 153mmGL|Y
01|67856|3|1|HSK125A-C3/4-153  HSK125A taper 3/4 Mill Chuck 153mmGL|Y
01|67856|5|1|HSK125A-C3/4-153SL HSK125A taper 3/4 Side Lock Milling|Y
01|67856|5|2|Chuck in 153mm GL|Y
01|67856|6|1|HSK125A-C3/4-153SL HSK125A taper 3/4 Side Lock Milling|Y
01|67856|6|2|Chuck in 153mm GL|Y
01|67856|7|1|HSK125A-C3/4-153SL HSK125A taper 3/4 Side Lock Milling|Y
01|67856|7|2|Chuck in 153mm GL|Y
01|67858|1|1|Quoted at a net price|Y
01|67869|1|1|Net price includes modification of holder.|Y
01|67869|1|2|Lyndex-Nikken to install SKN-16BJ(GH) coolant nut|Y
01|67869|1|3|Once modified holder is non-returnable.|Y
01|67869|3|1|Net price includes modification of holder.|Y
01|67869|3|2|Lyndex-Nikken to install SKN-25BJ(GH) coolant nut|Y
01|67869|3|3|Once modified holder is non-returnable.|Y
01|67869|4|1|Net price includes modification of holder.|Y
01|67869|4|2|Lyndex-Nikken to install SKN-25BJ(GH) coolant nut|Y
01|67869|4|3|Once modified holder is non-returnable.|Y
01|67871|1|1|Incudes servomotor for tilt and rotary|Y
01|67871|2|1|Includes cables servo amplifier and installation|Y
01|67871|2|2|Please provide data sheets pre-install to confirm|Y
01|67871|2|3|control options. 5 axis ladder logic required.|Y
01|67871|2|4|Installation is scheduled on first come first|Y
01|67871|2|5|served basis and will be determined ARO.|Y
01|67872|2|1|1 free pull stud with purchase of each matching holder|Y
01|67874|2|1|CAT50 Right AngleHead to Capto C6 Output|Y
01|67874|2|2|** 3 Pin Support Required **|Y
01|67874|2|3|No Coolant Max 4000 RPM Max 70Nm|Y
01|67874|2|4|Pricing based on 1pc purchased only|Y
01|67874|4|1|CAT50 Right AngleHead to Capto C6 Output|Y
01|67874|4|2|** 3 Pin Support Required **|Y
01|67874|4|3|No Coolant Max 4000 RPM Max 70Nm|Y
01|67874|4|4|Pricing based on 2pcs purchased at same time|Y
01|67874|7|1|CAT50 RAH to MI63 Output|Y
01|67874|7|2|** 3 Pin Support Required **|Y
01|67874|7|3|Ext/Int Coolant Max 5000RPM 150NM|Y
01|67874|9|1|CAT50 RAH to MI63 Output|Y
01|67874|9|2|** 3 Pin Support Required **|Y
01|67874|9|3|Ext/Int Coolant Max 5000RPM 150NM|Y
01|67874|9|4|Pricing based on 2pcs purchased at same time|Y
01|67874|11|1|MI63 to 25.4mm End Mill Holder|Y
01|67874|12|1|MI63 to 31.75mm End Mill Holder|Y
01|67874|15|1|CAT50 RAH to ER50 Output|Y
01|67874|15|2|** 3 Pin Support Required **|Y
01|67874|15|3|Ext/Int Coolant Max 5000RPM 150NM|Y
01|67874|17|1|CAT50 RAH to ER50 Output|Y
01|67874|17|2|** 3 Pin Support Required **|Y
01|67874|17|3|Ext/Int Coolant Max 5000RPM 150NM|Y
01|67874|17|4|Pricing based on 2pcs purchased at same time|Y
01|67874|19|1|ER50 COLLETS in Non-Coolant Thru style are available in|Y
01|67874|19|2|Limited Sizes and Qty: 12mm thru 34mm|Y
01|67874|21|1|Custom Positioning Block manufactured by Lyndex-Nikken|Y
01|67874|21|2|per specs received from End User by Tim Reeves.|Y
01|67878|5|1|*non-coolant|Y
01|67878|5|2|for Brother Speedio S700X1|Y
01|67879|5|1|In place of hydraulic chuck|Y
01|67882|1|1|CNC-260TFA-M WITH BOOSTER AND CABLE|Y
01|67882|1|2|INSTALLATION NOT INCLUDED|Y
01|67884|1|1|Howa H3YS6 M-5515 Chuck per Howa drawing H3Y56-M5515|Y
01|67884|1|2|Quote exact as drawing provided by Musashi Auto Parts|Y
01|67884|1|3|Net price reflects direct shipment to Musashi Canada|Y
01|67884|1|4|If Musashi places order we would need FedX or DHL|Y
01|67884|1|5|collect number. We would be happy to use Duramill|Y
01|67884|1|6|commerical paperwork.|Y
01|67884|3|1|Howa H3YS6 M-5515 Chuck per Howa drawing H3Y56-M5515|Y
01|67884|3|2|Quote exact as drawing provided by Musashi Auto Parts|Y
01|67884|3|3|Net price reflects FOB Lyndex-Nikken Mundelein IL|Y
01|67884|5|1|H3YS6 M-5515 per drawingwithout base jaw insert jaws|Y
01|67884|5|2|and center.|Y
01|67884|5|3|Net price reflects direct shipment to Musashi Canada.|Y
01|67884|5|4|If Musashi places order we would need FedX or DHL|Y
01|67884|5|5|collect number. We would be happy to use Duramill|Y
01|67884|5|6|commerical paperwork.|Y
01|67884|7|1|H3YS6 M-5515 per drawingwithout base jaw insert jaws|Y
01|67884|7|2|and center.|Y
01|67884|7|3|Net price reflects FOB Lyndex-Nikken Mundelein IL|Y
01|67884|9|1|Crank Lever for H3YS6 M-5515|Y
01|67884|9|2|1set (=3p)|Y
01|67884|9|3|Net price reflects direct shipment to Musashi Canada.|Y
01|67884|9|4|If Musashi places order we would need FedX or DHL|Y
01|67884|9|5|collect number. We would be happy to use Duramill|Y
01|67884|9|6|commerical paperwork.|Y
01|67884|13|1|Crank Lever for H3YS6 M-5515|Y
01|67884|13|2|1set (=3p)|Y
01|67884|13|3|Net price reflects FOB Lyndex-Nikken Mundelein IL|Y
01|67886|2|1|Includes: Drive Unit Short Bar Fiber Optic Cable|Y
01|67886|2|2|Communication Cable Bulkhead Cables External Cables|Y
01|67886|2|3|Parameter Change|Y
01|67892|1|1|Motor is not included (Toshiba Machine supply)|Y
01|67892|1|2|Heidenhain Scale RON886 with Cable|Y
01|67892|1|3|Scale Kit & Installation Labor|Y
01|67892|1|4|T-Slot for Face Plate(Please refer to attached drawing)|Y
01|67892|1|5|Unit Price Each. Special Order.|Y
01|67892|2|1|Ext Cable Set (5m)|Y
01|67895|1|1|Reference RGA# TAR-49396|Y
01|67895|1|2|TAT-400 s/n: 1154|N
01|67896|1|1|Part Number: OKU-LB-EXMW-SET|Y
01|67902|1|1|Tooling Certificate Number: 25000-896-121616|Y
01|67905|1|1|Net price includes modification of holder.|Y
01|67905|1|2|Lyndex-Nikken to install SKN-16BJ(GH) coolant nut|Y
01|67905|1|3|Once modified holder is non-returnable.|Y
01|67905|3|1|Net price includes modification of holder.|Y
01|67905|3|2|Lyndex-Nikken to install SKN-25BJ(GH) coolant nut|Y
01|67905|3|3|Once modified holder is non-returnable.|Y
01|67905|4|1|Net price includes modification of holder.|Y
01|67905|4|2|Lyndex-Nikken to install SKN-25BJ(GH) coolant nut|Y
01|67905|4|3|Once modified holder is non-returnable.|Y
01|67906|1|1|Reference RGA# TOR-49447|Y
01|67906|1|2|PF-2|N
01|67908|1|1|Net price includes modification of holder.|Y
01|67908|1|2|Lyndex-Nikken to install SKN-16BJ(GH) coolant nut|Y
01|67908|1|3|Once modified holder is non-returnable.|Y
01|67908|3|1|Net price includes modification of holder.|Y
01|67908|3|2|Lyndex-Nikken to install SKN-25BJ(GH) coolant nut|Y
01|67908|3|3|Once modified holder is non-returnable.|Y
01|67908|4|1|Net price includes modification of holder.|Y
01|67908|4|2|Lyndex-Nikken to install SKN-25BJ(GH) coolant nut|Y
01|67908|4|3|Once modified holder is non-returnable.|Y
01|67921|1|1|Reference RGA# TAR-49451|Y
01|67921|1|2|CNCZ250FA-M s/n: LN-0002|N
01|67922|2|1|NBT30-SK20C-90P-J TaperPlus BT30 SK20 Slim Chuck w/High|Y
01|67922|2|2|Speed Coolant Nut installed at factory|Y
01|67951|1|1|#50 Special Angle Head ER25 Output Max 8000RPM 30Nm|Y
01|67951|1|2|Overall Gauge Length = 466mm|Y
01|67951|1|3|No Coolant Supply|Y
01|67951|1|4|Net price reflects a purchase order of 1 piece.|Y
01|67951|3|1|#50 Special Angle Head ER25 Output Max 8000RPM 30Nm|Y
01|67951|3|2|Overall Gauge Length = 466mm|Y
01|67951|3|3|No Coolant Supply|Y
01|67951|3|4|Net price reflects a purchase order of 2 pieces.|Y
01|67964|2|1|Quoted at a net price|Y
01|67970|1|1|8 pcs ETA 2/28 balance ETA 10 weeks|Y
01|67970|2|1|Balance ETA 10 weeks ARO|Y
01|67970|3|1|Balance ETA 10 weeks ARO|Y
01|67970|4|1|Balance ETA 10 weeks ARO|Y
01|67976|2|1|Quoted at a net price|Y
01|67976|2|2|Pricing includes coolant port modification|Y
01|67979|1|1|Reference RGA# TOR-49462|Y
01|67979|1|2|NC5-63S-F50-220-14|N
01|67999|7|1|KM3/4-5 Milling Chuck Collet|Y
01|67999|9|1|C4006-0375-11.00 CAT40 End Mill Holder 3/8 X 11.0 gage|Y
01|68000|1|1|Motor is not included (TOSHIBA will supply the motor)|Y
01|68000|1|2|Heidenhain Scale RON886 with Cable|Y
01|68000|1|3|Scale Kit & Installation Labor|Y
01|68000|1|4|T-Slot for Face Plate(Please refer to attached drawing)|Y
01|68000|1|5|Unit Price Each. Special Order.|Y
01|68000|2|1|Ext Cable Set (5m)|Y
01|68001|1|1|Above Net Charge is for 1-3 pcs|Y
01|68001|5|1|Above Net Charge is for 4+ pcs|Y
01|68021|2|1|This line is referenced at your NET cost|Y
01|68053|2|1|Per drawing to be provided by Meggitt Aircraft|Y
01|68053|2|2|Price includes ID Chip Hole installing the chip and|Y
01|68053|2|3|re-balancing holders|Y
01|68053|6|1|Per drawing to be provided by Meggitt Aircraft|Y
01|68053|6|2|Price includes ID Chip Hole installing the chip|Y
01|68058|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|68058|2|2|external cable set fiber optic cable communication|Y
01|68058|2|3|cable parameter changes travel and labor for|Y
01|68058|2|4|installing one rotary table on one new Toyoda Stealth|Y
01|68058|2|5|machine.|Y
01|68074|2|1|1 free knob with purchase of matching holder|Y
01|68077|1|1|Above holder is a special and non cancelable and|Y
01|68077|1|2|non-returnable.|Y
01|68077|3|1|9 pieces stock/bal 11 weeks. Please see|Y
01|68077|3|2|HSK63A-0187-5.00B as substitute.|Y
01|68077|5|1|11 pieces stock/ Bal 11 weeks. Please offer|Y
01|68077|5|2|HSK63A-0250-3.00B as substitute.|Y
01|68077|7|1|7 pieces stock/ Bal 11 weeks. Please offer|Y
01|68077|7|2|HSK63A-0250-5.00B as substitute.|Y
01|68077|9|1|5 pieces stock/ Bal due 02-15 Please offer|Y
01|68077|9|2|HSK63A-0375-3.50B  as substitute.|Y
01|68077|25|1|4-pcs due 2-10/Balance 6 Weeks|Y
01|68079|1|1|B4037-0025-8.00|Y
01|68084|9|1|DELIVERY 4-5 WEEKS|Y
01|68085|1|1|Includes Cables for Each Axis|Y
01|68092|1|1|Set includes: 2-CNCZ180LSABR2 High Speed rotary tables|Y
01|68092|1|2|electronics and sheet metal divider for the Brother|Y
01|68092|1|3|R450X1.|Y
01|68104|1|1|Option 1|Y
01|68104|7|1|Custom Positioning Block produced by Lyndex-Nikken per|Y
01|68104|7|2|specs provided from End User to Tim Reeves.|Y
01|68109|1|1|3/64=.047IN|Y
01|68109|1|2|Collapse range on E16-004 .063-.047|Y
01|68111|10|1|RKS #350-30|Y
01|68111|11|1|RKS #329-13|Y
01|68120|3|1|This item is given in terms of NET price.|Y
01|68123|5|1|Quoted for consideration customer neededER25|N
01|68127|5|1|MACHINE TO HAVE DDRT INTERFACE FROM FACTORY|Y
01|68127|5|2|INSTALLATION INCLUDES CABLES SERVO TRAVEL LABOR|Y
01|68127|10|1|LYNDEX NIKKEN LIST PRICE TOOL CERTIFICATE  (NO CHARGE)|Y
01|68136|1|1|Quoted as NET Pricing|Y
01|68136|2|1|Quoted as NET pricing|Y
01|68141|1|1|Consignment table for Incipio test cut.|Y
01|68162|1|1|HSK100A-1500-4.00 1.1/2 End Mill Holder 4.00 Gage|Y
01|68167|2|1|BALANCE ETA 3/30|Y
01|68169|1|1|Quoted at a net price|Y
01|68182|1|1|Table with HAAS motors and cables - AIR BRAKE|Y
01|68182|2|1|Free $1K Tooling Certificate good for list price tool|Y
01|68182|2|2|holders. Thank you for your rotary table purchase.|Y
01|68186|1|1|1.063IN=27MM|Y
01|68187|1|1|Delivery dependent on Mazak E-BILL|Y
01|68187|2|1|Need Mazak E-BILL for correct wiring|Y
01|68187|3|1|Includes labor and travel expenses Mazak E-BILL|Y
01|68187|3|2|needed|Y
01|68192|1|1|2.559 GL|Y
01|68192|2|1|ITEM IS QUOTED AT NET PRICE|Y
01|68205|1|1|Includes cables for AA21|Y
01|68207|2|1|1 free pull stud w/ purchase of matching BT40 holder|Y
01|68224|4|1|OK1-16 Collet|Y
01|68235|1|1|Non-returnable and non-cancellable|Y
01|68247|1|1|CAT50 RAH Fixed Angle Style ER32 Output|Y
01|68247|1|2|Internal Coolant Max 6500RPM|Y
01|68247|1|3|Fixed Angle at 30.7803 degrees|Y
01|68247|1|4|Pricing reflects a minimum order of 3 heads.|Y
01|68281|26|1|Quoted in consideration to SK25-7/8|Y
01|68281|26|2|7/8=.875in=22.22mm|Y
01|68281|26|3|Collapse range on this collet 22.5-22.0mm|Y
01|68281|29|1|Quoted in consideration to SKN-6W|Y
01|68281|30|1|Quoted in consideration to SKN-10W|Y
01|68291|1|1|Includes multiple spindle table with motors and cables|Y
01|68291|1|2|sets.|Y
01|68300|1|1|Quoted at a net price|Y
01|68300|1|2|Confirm shank and square size .480x.360 prior to|Y
01|68300|1|3|purchase|Y
01|68301|3|1|Wire Harness|Y
01|68301|4|1|External Cables|Y
01|68321|2|1|Per drawing to be provided by Meggitt Aircraft|Y
01|68321|2|2|Price includes ID Chip Hole installing the chip and|Y
01|68321|2|3|re-balancing holders|Y
01|68321|6|1|Per drawing to be provided by Meggitt Aircraft|Y
01|68321|6|2|Price includes ID Chip Hole installing the chip|Y
01|68326|1|1|Quoted at a net price|Y
01|68326|2|1|Quoted at a net price|Y
01|68344|1|1|#40-TB40-300|Y
01|68344|1|2|40 TAPER TESTBAR w/o Flange 300mm|Y
01|68344|1|3|Special Order Unit Price Each. MOQ 5|Y
01|68344|2|1|#40-TB40-300|Y
01|68344|2|2|40 TAPER TESTBAR w/o Flange 300mm|Y
01|68344|2|3|Special Order. Unit Price Each.|Y
01|68344|4|1|#50-TB50-300|Y
01|68344|4|2|50 TAPER TEST BAR W/O FLANGE 300mm|Y
01|68344|4|3|Special Order. Unit Price Each. MOQ 5|Y
01|68344|5|1|#50-TB50-300|Y
01|68344|5|2|50 TAPER TEST BAR W/O FLANGE 300mm|Y
01|68344|5|3|Special Order. Unit Price Each.|Y
01|68344|7|1|HSK63A-TESTBAR-300 (300mm)|Y
01|68344|7|2|Special Order. Unit Price Each. MOQ 5|Y
01|68344|8|1|HSK63A-TESTBAR-300 (300mm)|Y
01|68344|8|2|Special Order. Unit Price Each.|Y
01|68344|10|1|HSK100A-TESTBAR-300 (300mm)|Y
01|68344|10|2|Special Order. Unit Price Each.|Y
01|68369|1|1|Howa Chuck for Okuma V80R/ 800mm/ 6-jaw for A2-11|Y
01|68369|1|2|spindle mount.|Y
01|68369|1|3|Price includes AIR delivery to Lyndex-Nikken.|Y
01|68369|1|4|FOB from Lyndex-Nikken Mundelein IL|Y
01|68369|1|5|Customer is responsible for freight from Mundelein IL.|Y
01|68369|3|1|Howa Chuck for Okuma V80R/ 800mm/ 6-jaw for A2-11|Y
01|68369|3|2|spindle mount..|Y
01|68369|3|3|Price includes Boat delivery to Lyndex-Nikken.|Y
01|68369|3|4|FOB from Lyndex-Nikken Mundelein IL|Y
01|68369|3|5|Customer is responsible for freight from Mundelein IL.|Y
01|68374|1|1|VMK8-7/64|Y
01|68374|1|2|Pricing reflects your NET COST for a 5pc quantity.|Y
01|68374|3|1|VMK8-7/64|Y
01|68374|3|2|Pricing reflects your NET COST for a 10pc quantity.|Y
01|68386|1|1|ETA 2 WEEKS|Y
01|68396|5|1|Custom Positioning Block produced by Lyndex-Nikken per|Y
01|68396|5|2|specs provided by End User to Tim Reeves|Y
01|68435|2|1|HSK40A-SK16-80P  SK16 Slim Chuck 80mm GL High-Speed|Y
01|68436|1|1|Reference RGA# LVR-49412|Y
01|68436|1|2|T32386 s/n: A0045|N
01|68436|3|1|Spindles and drive shaft are damaged and must be|Y
01|68436|3|2|replaced. Bearings seals and o-rings are worn and must|Y
01|68436|3|3|be replaced. Collet nuts must also be replaced. Labor|Y
01|68436|3|4|is included.|Y
01|68436|5|1|T32386 s/n: A0048|N
01|68436|7|1|Spindles and drive shaft are damaged and must be|Y
01|68436|7|2|replaced. Bearings seals and o-rings are worn and must|Y
01|68436|7|3|be replaced. Collet nuts must also be replaced. Labor|Y
01|68436|7|4|is included.|Y
01|68436|9|1|T32394 s/n: NA|N
01|68436|11|1|Spindle is damaged and must be replaced. Bearings|Y
01|68436|11|2|seals and o-rings are worn and must be replaced. Labor|Y
01|68436|11|3|is included.|Y
01|68439|1|1|Net price relects minimum purchase order of 3 heads.|Y
01|68439|1|2|BT30 Special RAH 1:4.96 SpeederMax Input RPM = 1950|Y
01|68439|1|3|Max Output RPM = 9500Max Tq = 3NmEndmill style tool|Y
01|68439|1|4|interface.|Y
01|68451|1|1|P/N: MZQT47-ER16-AD-SUB-HS-1:4|Y
01|68451|1|2|125029  Mazak Live X/Z Adj ER16 Sub Spindle 1:4 ratio|Y
01|68469|1|1|90mm (3.54) gl|Y
01|68469|2|1|120mm (4.72) gl|Y
01|68469|4|1|80mm (3.14) gl|Y
01|68469|4|2|compared to NT Tool: HSK63A-HDC16-90|Y
01|68469|6|1|Sub for 16mm Hydraulic Chuck|Y
01|68469|6|2|using 16mm ID sleeve|Y
01|68469|9|1|76.2mm (3.00) gl|Y
01|68471|1|1|MZQT5-BG20Z-MS-C|Y
01|68471|1|2|2 Boring Bar Holder Main/Sub|Y
01|68471|8|1|MZQT5-OD10X-MS|Y
01|68471|8|2|1 Turning Holder Main/Sub|Y
01|68489|1|1|500MM table with Top Mount Fanuc motor|Y
01|68494|1|1|Modification is for ID Chip Hole only net ea.|Y
01|68494|2|1|Modification charge pricing includes:|Y
01|68494|2|2|ID Chip Hole installing the chip and re-balancing the|Y
01|68494|2|3|holders. This price is a 5pc price.|Y
01|68494|2|4|1-4 = $120.00 net ea.|Y
01|68494|2|5|5-9 = $100.00 net ea.|Y
01|68494|2|6|10-20 = $75.00 net ea.|Y
01|68494|2|7|21+ = $65.00 net ea.|Y
01|68500|1|1|Quoted at a net price|Y
01|68505|2|1|BALANCE ETA MID-FEBRUARY|Y
01|68505|15|1|BALANCE ETA EARLY-MARCH|Y
01|68513|1|1|Morse Taper 5 2.5 ID End Mill Holder|Y
01|68516|2|1|Installation: Dual axis drive unit short bar fiber|Y
01|68516|2|2|optic cable communications cables bulkhead cables|Y
01|68516|2|3|external cables parameter changes service time and|Y
01|68516|2|4|travel.|Y
01|68519|2|1|Mount Chuck on table at Lyndex-Nikken|Y
01|68519|4|1|For 16mm T-Slot to 14mm 5AX-201|Y
01|68519|5|1|For 16mm T-Slot for P-170S Tailstock|Y
01|68519|7|1|8 Air Chuck complete with adpater plate rotary|Y
01|68519|7|2|union Chuck Jaws RFL unit manual actuator and|Y
01|68519|7|3|accessories for air connection.|Y
01|68519|8|1|7 Air Chuck complete with adpater plate rotary|Y
01|68519|8|2|union Chuck Jaws RFL unit manual actuator and|Y
01|68519|8|3|accessories for air connection.|Y
01|68525|2|1|Promised for $180|Y
01|68527|1|1|PRO|Y
01|68534|3|1|PER APPLICATION HYD. SOURECE REQUIRED FOR ROTARY BRAKE|Y
01|68534|3|2|TAILSTOCK AND CHUCK ALSO HYDRAULIC|Y
01|68534|11|1|HYD CHUCK ADAPTER PLATE|Y
01|68534|13|1|DRAWBAR FOR CHUCK|Y
01|68534|18|1|HYD. UNIT INCLUDES 3 PORT MANIFOLD AND SOLENOID|Y
01|68534|18|3|ALL FUNTIONS SUCH AS CHUCK ACTIVATION OF TAILSTOCK|Y
01|68534|18|4|TO BE DONE THROUGH MACHINE TOOL. NO MANUAL SWITCHES.|Y
01|68534|18|5|OR FOOT PEDALS QUOTED|Y
01|68535|3|1|Special Adapter Plate per specs provided|Y
01|68545|1|1|Net Price Quoted|Y
01|68545|1|2|PRO|Y
01|68545|2|1|Net Price Quoted|Y
01|68545|2|2|PRO|Y
01|68545|3|1|Net Price Quoted|Y
01|68545|3|2|PRO|Y
01|68549|1|1|Quoted at a net price|Y
01|68554|1|1|ER32 Output 6000 RPM 51 Ft/LB Torque 31 lbs|Y
01|68554|3|1|Blank block with tapered sleeve. Requires customer|Y
01|68554|3|2|modification.|Y
01|68558|1|1|Labor to convert CNC180-YA table previously sold to|Y
01|68558|1|2|Orchid to a Doosan. Motor TBD during conversion.|Y
01|68562|2|1|BALANCE ETA 8-10 WEEKS ARO|Y
01|68568|2|1|Price on block reflects Net Charge|Y
01|68579|1|1|#NA8S ALPS ER8 NUT|Y
01|68579|1|2|11mm Hex Nut Cap|Y
01|68584|3|1|Needed for CAT50-FMD25.4-90U|Y
01|68592|5|1|Custom Positioning Block produced by Lyndex-Nikken per|Y
01|68592|5|2|specs provided by End User to Tim Reeves|Y
01|68592|5|3|ETA quoted is after receipt of these specs.|Y
01|68594|1|1|Table with motors and hydraulic braking.|Y
01|68594|2|1|Air/Hydraulic booster for table brake system.|Y
01|68594|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|68594|3|2|external cable set communication cable fiber optic|Y
01|68594|3|3|cable parameter changes travel and labor for|Y
01|68594|3|4|installing one rotary table on one Doosan DNM750.|Y
01|68612|3|1|Coolant Seals to be removed at factory prior to ship|Y
01|68612|7|1|Coolant Seals to be removed at factory prior to ship|Y
01|68621|1|1|Tooling Certiicate Number 13687-855-101816|Y
01|68627|2|1|Quoted at a net price|Y
01|68627|5|1|Quoted at a net price|Y
01|68632|1|1|16C Round Collet 1-9/64|Y
01|68660|7|1|below chuck adapter plate and tailstock included N/C|Y
01|68670|3|1|THIS LINE IS AT YOUR NET COST|Y
01|68713|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|68719|1|1|with PS-868 Retention Knob installed at factory.|Y
01|68719|1|2|See drawing sent by Honda.|Y
01|68719|2|1|with PS-N63AE Retention Knob installed by factory.|Y
01|68719|2|2|See drawing sent by Honda.|Y
01|68725|56|2|1pcs available only|Y
01|68729|1|1|Quoted at a net price|Y
01|68744|1|1|Quoted at a net price|Y
01|68754|1|1|BALANCE ETA 2/22|Y
01|68754|2|1|BALANCE ETA 3/8|Y
01|68756|1|1|Howa P/N: H0370M10 R-2051|Y
01|68756|2|1|#6 Master Jaw 3 pcs = 1 Set|Y
01|68756|3|1|#3 Wedge Plunger|Y
01|68767|1|1|Delivery is pending at this time.|Y
01|68786|1|1|Non returnable Non-cancelable|Y
01|68786|2|1|HSK40F ER25 Collet Chuck 60mm|Y
01|68786|2|2|ETA 12-14 WEEKS|Y
01|68786|2|3|Non-Returnable Non-cancelable|Y
01|68804|5|1|Blank disk to be machined out to 3 and 4 mm|Y
01|68810|2|1|For more pcs 8-9 wks|Y
01|68813|1|1|Tooling Certificate Face Value $2000.00|Y
01|68814|3|1|SF POTS are included with FI5 Unit at N/C.|Y
01|68814|5|1|H50A-SF0125-120 HSK50A 1/8 ID 120mm GL SF holder w/|Y
01|68814|5|2|Back up Screw|Y
01|68814|6|1|H50A-SF0250-120 HSK50A 1/4 ID 120mm GL SF holder w/|Y
01|68814|6|2|Back up Screw|Y
01|68814|7|1|H50A-SF6-120 HSK50A 6mm ID 120mm GL SF holder w/|Y
01|68814|7|2|Back up Screw|Y
01|68815|1|1|Complete with motor|Y
01|68815|1|2|*** Net Price Listed ****|Y
01|68815|4|1|In Stock Option|Y
01|68816|2|1|25mm subplate/riser to allow for 12 part swing|Y
01|68816|6|1|Installation Includes: Drive amps bulkhead cable sets|Y
01|68816|6|2|external cable sets communication cables parameter|Y
01|68816|6|3|changes travel and labor for installation|Y
01|68816|11|1|$ 1000.00 list price tool certificate at no charge|Y
01|68847|28|1|For Doosan Machine|Y
01|68872|1|1|This part is given in terms of NET price.|Y
01|68879|1|1|Repair of customer's BT40-MMC8-90|Y
01|68879|1|2|Reference RGA# TOR-49527|Y
01|68879|2|1|Tool was received partially diassembles.|Y
01|68879|2|2|This was cleaned up reassembled and tested.|Y
01|68879|2|3|Tool is within specification.|Y
01|68886|1|1|Haimer - F63.144.16|Y
01|68886|2|1|Haimer - 77.160.06|Y
01|68887|2|1|2pcs stock remainder ETA pending per factory.|Y
01|68897|1|1|MZQT5-BG20Z-MS-C|Y
01|68897|1|2|2 Boring Bar Holder Main/Sub|Y
01|68897|8|1|MZQT5-OD10X-MS|Y
01|68897|8|2|1 Turning Holder Main/Sub|Y
01|68901|1|1|Tooling Certificate Number: 8115-878-113016|Y
01|68903|3|1|BT50-SK20-165|Y
01|68903|4|1|CCNK32-25|Y
01|68903|5|1|CCNK32-1|Y
01|68903|6|1|CCNK25-20|Y
01|68903|7|1|CCNK25-3/4|Y
01|68903|8|1|CCNK25-5/8|Y
01|68903|9|1|CCNK25-16|Y
01|68903|10|1|CCNK25-12|Y
01|68903|11|1|CCNK25-1/2|Y
01|68906|1|1|Haimer - F63.144.16|Y
01|68906|2|1|Haimer - 77.160.06|Y
01|68908|18|1|This tool is given in terms of NET price.|Y
01|68916|2|1|Rev A Change GIB Screw from 1/4-20 to 5/16-24|Y
01|68916|2|2|Delivery: Order must be placed no later then end of|Y
01|68916|2|3|week 02-24-2017. If we do not receive order by than|Y
01|68916|2|4|delivery is 12~13 weeks. There is a 2 week delay at the|Y
01|68916|2|5|heat treatment plant and Golden Week starts end of|Y
01|68916|2|6|April thru the 1st week of May so Lyndex Japan will be|Y
01|68916|2|7|closed.|Y
01|68916|2|8|UNV 646|Y
01|68917|1|1|end of week 02-24-2017.If we do not receive order by|Y
01|68917|1|2|Delivery: 8-10 Weeks Order must be placed no later then|Y
01|68917|1|3|end of week 02-24-2017.If we do not receive order by|Y
01|68917|1|4|than delivery is 12~13 weeks. There is a 2 week delay|Y
01|68917|1|5|at heat treatment plant and Golden Week starts end of|Y
01|68917|1|6|April thru the 1st week of May so Lyndex Japan will be|Y
01|68917|1|7|closed.|Y
01|68918|1|1|UNV 13>> N5006-0750A-5.75-ID-GKN|Y
01|68918|1|2|Delivery: 8-10 Weeks Order must be placed no later then|Y
01|68918|1|3|end of week 02-24-2017.If we do not receive order by|Y
01|68918|1|4|end of week 02-24-2017.If we do not receive order by|Y
01|68918|1|5|than delivery is 12~13 weeks. There is a 2 week delay|Y
01|68918|1|6|at heat treatment plant and Golden Week starts end of|Y
01|68918|1|7|April thru the 1st week of May so Lyndex Japan will be|Y
01|68918|1|8|closed.|Y
01|68927|1|1|Quoted at a net price|Y
01|68934|3|1|H034M10-A8J 4 Bolt Pattern Adapter|Y
01|68934|5|1|Modification Charge to Thread Draw Nut per specs.|Y
01|68948|1|1|HH35C8 Replacement Cylinder -->C1TA140 H-492|Y
01|68948|1|2|Cannot use Standard C1TA140. See drawing for Special|Y
01|68948|1|3|replacement.|Y
01|68962|1|1|Repair of customer's 4x H-BO-QC-059|Y
01|68962|1|2|Reference RGA# TOR-49028|Y
01|68962|2|1|No parts need to be replaced.|Y
01|68962|2|2|Unit has been disassembled cleaned and reassembled.|Y
01|68991|1|1|HFO Tampa to supply correct motors|Y
01|68991|1|2|HFO Tampa to supply cables|Y
01|68991|1|3|Hydraulic Unit needed for clamping brake|Y
01|68991|7|1|Need to confirm Electrical info|Y
01|68995|1|1|Reference RGA# LVR-49360|Y
01|68995|1|2|MZMP47-MI50X-OFF-C s/n: 43000 01|N
01|68995|2|1|Bearings seals and o-rings are worn and must be|Y
01|68995|2|2|replaced. Labor is included.|Y
01|68996|1|1|This product is given in terms of NET pricing. This is|Y
01|68996|1|2|not standard stock and is therefore considered special.|Y
01|68996|1|3|This is non-returnable and non-refundable based upon|Y
01|68996|1|4|firm reciept of PO.|Y
01|69015|1|1|CAT50 Big Plus Special RAHER11 OutputExt Coolant|Y
01|69015|1|2|through PipeG/L = 329.5mm Taper to Centerline|Y
01|69015|1|3|Max Input RPM 10000 -> Output 14500 RPM|Y
01|69015|1|4|Gear Ratio: 1:1.45 Max TQ 6Nm|Y
01|69015|1|5|** 3 Pin Support Needed for Rigidity **|Y
01|69019|1|1|CAT50-UMT200UH was received with missing parts; per|Y
01|69019|1|2|your request quotation is to replace LED and spring.|Y
01|69019|1|3|All other parts are at customer's location and will be|Y
01|69019|1|4|reassembled by customer.|Y
01|69019|1|5|Reference RGA# TOR-49516|Y
01|69021|1|1|CAT50 Big Plus Special RAHER11 OutputExt Coolant|Y
01|69021|1|2|through PipeG/L = 329.5mm Taper to Centerline|Y
01|69021|1|3|Max Input RPM 10000 -> Output 14500 RPM|Y
01|69021|1|4|Gear Ratio: 1:1.45 Max TQ 6Nm|Y
01|69021|1|5|** 3 Pin Support Needed for Rigidity **|Y
01|69021|4|1|Taper Plus CAT50 RAH Fixed Angle Style|Y
01|69021|4|2|ER32 Output Internal Coolant Max 6500RPM|Y
01|69021|4|3|Fixed Angle at 30.7803 degrees|Y
01|69022|1|1|Reference RGA# LVR-49481|Y
01|69022|1|2|MZQT47-ER25X-OFF-HS s/n: 35933 01|N
01|69022|3|1|Bearings seals and o-rings are worn and must be|Y
01|69022|3|2|replaced. Spindles must be resurfaced. Labor is|Y
01|69022|3|3|included.|Y
01|69026|1|1|Reference RGA# LVR-49393|Y
01|69026|1|2|Mimatic Live Tool s/n: 65886 02|N
01|69026|3|1|Bearings seals and o-rings are worn and must be|Y
01|69026|3|2|replaced. Bevel gear set is damaged and must be|Y
01|69026|3|3|replaced. Labor is included.|Y
01|69027|1|1|Repair of customer's CAT50-C1-105U|Y
01|69027|1|2|Reference RGA# TOR-49524|Y
01|69027|1|3|Delivery: 2-3 days|Y
01|69039|1|1|Repair of 1x HSK100A-C3/4-115G|Y
01|69039|1|2|Reference RGA# TOR-49523|Y
01|69039|8|1|2nd Unit is unrepairable due to damage on the ID bore|Y
01|69039|8|2|and evidence the tool shank not being inserted to an|Y
01|69039|8|3|acceptable depth causing tool to spin.|Y
01|69041|1|1|CAT50 RAH to ER50 Output|Y
01|69041|1|2|** 3 Pin Support Required **|Y
01|69041|1|3|Ext/Int Coolant Max 5000RPM 150NM|Y
01|69041|2|1|ER50 COLLETS in Non-Coolant Thru style are available in|Y
01|69041|2|2|Limited Sizes and Qty: 12mm thru 34mm|Y
01|69041|3|1|Custom Positioning Block manufactured by Lyndex-Nikken|Y
01|69041|3|2|per specs received from End User by Tim Reeves.|Y
01|69052|2|1|With PS-17|Y
01|69055|2|1|100MM Twin Spindle table with S500 installation kit.|Y
01|69055|2|2|INTERFACE HARDWARE FOR TCS-2D|Y
01|69055|4|1|REQUEST TAILSTOCK WITH MORSE TAPER. THESE ARE|Y
01|69055|4|2|INTERCHANGEABLE|Y
01|69055|4|3|MORSE TAPER 2 3 4 AVAILABLE|Y
01|69055|4|4|MORSE TAPER CENTER NOT INCLIDED SOCKET ONLY|Y
01|69055|8|1|TO BE CONFIRMED|Y
01|69055|8|2|5C COLLET NOT INCLUDED THIS PER DISCUSSION WILL BE A|Y
01|69055|8|3|SPECIAL|Y
01|69059|1|1|3.54 Gage Length (89mm)|Y
01|69059|2|1|*Pre-balanced and Balanceable|Y
01|69059|4|1|*wrench for HSK100A-C1-115|Y
01|69061|1|1|Reference RGA# LVR-49411|Y
01|69061|1|2|MNL12-ER32Z s/n: A0584|N
01|69061|3|1|Gears are damaged and must be replaced. Bearings seals|Y
01|69061|3|2|and o-rings are worn and must be replaced. Collet nut|Y
01|69061|3|3|must also be replaced. Housing is damaged this cannot|Y
01|69061|3|4|be repaired. ID for bearings may have too much damage.|Y
01|69061|3|5|Labor is included.|Y
01|69064|1|1|HSK100A-SK20C-120-J-IDU (w/ coolant nut installed)|Y
01|69064|2|1|(w/ coolant nut installed)|Y
01|69064|4|1|HSK100A-MDSK20-140-J-IDU (w/coolant nut installed)|Y
01|69064|5|1|HSK100A-C25-115G-IDU|Y
01|69064|6|1|HSK100A-MDSK16C-D65-340P-J-IDU w/Coolant Nut installed|Y
01|69064|7|1|SK20-8A|Y
01|69064|15|1|(spare replacement coolant nuts for MDSK16 Chucks)|Y
01|69064|16|1|(spare replacement coolant nuts for MDSK20 Chucks)|Y
01|69064|17|1|(Replacement Hi-Speed coolant nuts for SK10 Chucks)|Y
01|69064|18|1|SKJ25-8C Coolant Thru Cap for SK20-8A collet|Y
01|69064|18|2|SK20/SK25 Coolant Cap for 8mm|Y
01|69064|21|1|SKJ25-14C Coolant Thru Cap for SK20-14A|Y
01|69064|25|1|SKJ25-8 Coolant Cap for SK20-8A|Y
01|69064|32|1|This piece was requested by Steve Morris of Rolls Royce|Y
01|69064|32|2|to Bob Berongi of Lyndex-Nikken.|Y
01|69065|1|1|Morse Taper 5 2.5 ID End Mill Holder|Y
01|69065|3|1|Morse Taper 5 2.5 ID End Mill Holde|Y
01|69065|5|1|Morse Taper 5 2.5 ID End Mill Holde|Y
01|69073|1|1|PN#FMS-6.0|Y
01|69073|7|1|PN#HMS-6.0|Y
01|69073|8|1|PN#HMS-8.0|Y
01|69073|11|1|PN#HMS-13.0|Y
01|69075|4|1|CCK1.1/4-28 Special sized Coolant Collets|Y
01|69075|5|1|CKFN32(1.1/4)-28C Coolant Thru Cap for CCK1.1/4-28|Y
01|69075|7|1|CCK1.1/4-19/32 Special sized Coolant Collets|Y
01|69075|8|1|CKFN32(1.1/4)-19/32 Coolant Thru Cap for CCK1.1/4-19/32|Y
01|69076|1|1|Start2 Shrink fit unit + 10 std GL HSK63A SF holders|Y
01|69076|2|1|Fi-5b Shrink fit unit + 10 std GL HSK63A SF holders|Y
01|69078|1|1|CAT50-SF0750-8.00 CAT50 Shrink Fit Holder 3/4 X 8.00|Y
01|69090|1|1|Reference RGA# TAR-49515|Y
01|69090|1|2|CNC180 s/n: 10071|N
01|69095|2|1|Included will be correct riser for Rotary table to|Y
01|69095|2|2|allow for proper swing for clearance. NO work holding|Y
01|69095|2|3|has been quoted.|Y
01|69095|2|4|To allow for 90 degree tilt and subplate adapter|Y
01|69095|2|5|approx 50mm will be included also|Y
01|69095|2|6|REVISED 7/25/2017 TO REFLECT CORRECT P/N FOR OSP P300MA|Y
01|69095|2|7|EXTERNAL CABLES INCLUDED|Y
01|69097|3|1|Supplied with Slotted Arbor Screw|Y
01|69097|4|1|Installed onto C4011-0750-4.00|Y
01|69097|5|1|*Net Charge for Modifications|Y
01|69097|5|2|Coolant enters through the flange & exits out from the|Y
01|69097|5|3|center of nose through slotted arbor screw|Y
01|69098|1|1|Delivery is 12 weeks after signed approval drawing|Y
01|69118|1|1|Holds .236|Y
01|69118|2|1|Holds .281|Y
01|69118|3|1|Holds .354|Y
01|69118|5|1|if true .394 you may need to go with this|Y
01|69118|6|1|*Holds .393|Y
01|69119|3|1|Installation includes driveinternal cable set fiber|Y
01|69119|3|2|opticsexternal cable set connectors travel labor|Y
01|69119|3|3|Lyndex Nikken will not be responsible for the accuracy|Y
01|69119|3|4|and performance of the tables due. Existing/used tables|Y
01|69119|3|5|being transferred.|Y
01|69119|3|6|New Fanuc Alpha Motor included|Y
01|69128|1|1|Part#C4006-3-60|Y
01|69128|1|2|CAT40 3mm End Mill Holder|Y
01|69128|1|3|Quoted at a net price|Y
01|69132|3|1|HYDRAULIC UNIT FOR TAILSTOCK AND CHUCK|Y
01|69133|1|1|PROPER FIT TO MACHINE NEEDS TO BE CONFIRMED|Y
01|69133|6|1|subplate for tailstocks to be mounted to match table|Y
01|69133|7|1|4TH INTERFACE INCLUDES DRIVE CABLES FIBRE OPTICS|Y
01|69133|7|2|TRAVEL AND LABOR|Y
01|69133|9|1|$ 1000 List price Lyndex Nikken Tool Cert (N/C)|Y
01|69141|3|1|Part NK103-7M000 Straight ER32 Output External Coolant|Y
01|69141|5|1|Special Live Tool NK103-6F000 72-Deg Fixed Angle|Y
01|69141|5|2|Holder.|Y
01|69141|6|1|Special Live Tool NK103-6G000  X-Axis Straight|Y
01|69141|6|2|20mm Side Lock Output|Y
01|69154|1|1|1-2 piece price.|Y
01|69154|3|1|This is a price break if all 3 tools are purchased|Y
01|69154|3|2|then customer may take this price.|Y
01|69180|1|1|Touch Spindle Probe for CAT40 Taper|Y
01|69180|1|2|Includes Taper Sensor Receiver Cables Stylus|Y
01|69180|2|1|Includes Tool Setter and accessories|Y
01|69180|3|1|Installation of Tool Setter & Spindle Probe Above|Y
01|69180|3|2|Includes service tech's time + hardware that is needed.|Y
01|69190|1|1|Note above price is Net Charge|Y
01|69196|1|1|Alternative for CAT50-Z12-130U|Y
01|69196|1|2|*This has a gage length of 5.02 (127.5mm)|Y
01|69207|1|1|Reference RGA# LVR-49496|Y
01|69207|1|2|T32386 s/n: A0012|N
01|69207|4|1|Spindles are damaged and must be replaced. Bearings|Y
01|69207|4|2|seals and o-rings are worn and must be replaced.|Y
01|69207|4|3|Collet nuts must also be replaced. Labor is included.|Y
01|69211|1|1|105MM Stainless Steel Spindle indexer with Nikken|Y
01|69211|1|2|control box  pendant power cable M-code cable and|Y
01|69211|1|3|external cable set.|Y
01|69213|1|1|Reference RGA# CUR-49492|Y
01|69213|1|2|C50RAM-ER32-285ST s/n: 308301|N
01|69213|3|1|Locking sleeve is damaged and must be replaced. Black|Y
01|69213|3|2|case damaged during shipping this must also be|Y
01|69213|3|3|replaced. Labor is included.|Y
01|69215|1|1|DIN5480 VDI30 105 Deg Fixed Live Tool ER25 Int Cool|Y
01|69215|1|2|Max 6000 RPM 50Nm Direction Input= Direction Output|Y
01|69215|1|3|P/N:TBD|Y
01|69220|2|1|2 gl (50.8mm)|Y
01|69222|3|1|SAME SPEC AS S/N 26502T W/O DIRECT CABLENO MOTOR|Y
01|69222|3|2|SPECIAL FACEPLATE INCLUDED|Y
01|69222|3|3|DELIVERY 6-8 WEEKS + SHIPPING FROM JAPAN|Y
01|69222|5|1|TCD-A7149 4 + 1 rj FOR CNC202LFA S/N 26502T|Y
01|69222|9|1|5AX-N400FA-M. SAME SPEC AS S/N 3103 WITH BASE FOR|Y
01|69222|9|2|SHIPPING PURPOSE|Y
01|69222|9|3|DELIVERY 2 MONTHS + SHIPPING FROM JAPAN|Y
01|69224|2|1|Gage length 2 (50.8mm)|Y
01|69244|2|1|Quoted at a net price|Y
01|69256|1|1|C5001-27-100|Y
01|69256|1|2|CAT50 27mm Shell Mill Holder w/ 100mm gage length|Y
01|69256|1|3|This item is not standard stock and considered special|Y
01|69267|9|1|Truck Ground LTL Service for either machine|Y
01|69280|1|1|new style with ID Chip Hole|Y
01|69282|1|1|Reference RGA# TOR-49533|Y
01|69282|1|2|W1505-1375-9.26(C)|N
01|69284|1|1|Quoted at a net price|Y
01|69284|2|1|Quoted at a net price|Y
01|69284|3|1|Quoted at a net price|Y
01|69284|4|1|Quoted at a net price|Y
01|69284|7|1|Quoted at a net price|Y
01|69284|8|1|Quoted at a net price|Y
01|69289|1|1|Manual Installation|Y
01|69289|1|2|No Motor|Y
01|69289|1|3|No Brake|Y
01|69289|1|4|No Installation|Y
01|69289|1|5|Customer responsible for mechanical connection for|Y
01|69289|1|6|index.|Y
01|69289|2|1|Included in package $2000 Tool Certificate to be|Y
01|69289|2|2|redeemed by end user within specified time limit.|Y
01|69300|1|1|Reference RGA# TAR-49440|Y
01|69300|1|2|5AX-130FA s/n: 3531|N
01|69307|1|1|Reference RGA# TAR-49595|Y
01|69307|1|2|5AX-130SA-BR s/n: 3774|N
01|69308|1|1|PROPER FIT TO MACHINE NEEDS TO BE CONFIRMED|Y
01|69308|2|1|8 Air Chuck Package Includes the following:|Y
01|69308|2|2|(2) 8 Air Chucks|Y
01|69308|2|3|(2) Adapter Plates for Chuck to Nikken Table|Y
01|69308|2|4|(2) Air Tubes/Rotary Union for Air Supply|Y
01|69308|2|5|(2) Support Bushings for Rotary Union|Y
01|69308|2|6|(2 Sets) Top Jaws Blank - Customer to Machine|Y
01|69308|2|7|(4) Pneumatic Foot Pedals with (2) Air Regulators|Y
01|69308|2|8|** Lyndex Nikken to Assemble Chucks Prior to Shippment|Y
01|69308|5|1|Configuration of part will be needed to confirm|Y
01|69308|5|2|proper tailstock center|Y
01|69308|6|1|subplate for tailstocks to be mounted to match table|Y
01|69308|9|1|$ 1000 List price Lyndex Nikken Tool Cert (N/C)|Y
01|69309|1|1|4th axis table for Genos 460|Y
01|69309|2|1|LYNDEX NIKKEN TOOL CERTIFICATE $ 1000 VALUE  NO CHARGE|Y
01|69309|8|1|LYNDEX NIKKEN TOOL CERTIFICATE  2000 VALUE NO CHARGE|Y
01|69309|8|2|THIS OFFER IF 5 AXIS TABLE IS PURCHASED|Y
01|69347|2|1|With PS-17|Y
01|69349|2|1|With PS-17|Y
01|69352|5|1|Mimatic# 155471|Y
01|69355|1|1|ETA Pending|Y
01|69357|3|1|2pcs stock remainin balance ETA aprox 12/20/2016|Y
01|69360|1|1|Reference RGA# TOR-49590|Y
01|69360|1|2|#1 CAT40-NPU8-80U|N
01|69401|1|1|Quoted in consideration to W25M5-0875-120 which has|Y
01|69401|1|2|been discontinued|Y
01|69404|1|1|Reference RGA# TAR-49558|Y
01|69404|1|2|CNC300MA s/n: 1045|N
01|69411|1|1|B/HSK63A-TG0750-4.20|Y
01|69414|1|1|1-4pc|Y
01|69414|2|1|5-9pcs|Y
01|69414|3|1|10pc+|Y
01|69415|1|1|Reference RGA# TAR-49535|Y
01|69415|1|2|5AX-350FA-R36 s/n: 3528|N
01|69420|1|1|NEED SCHEMATCIS FROM EXISITNG TABLE|Y
01|69427|1|1|Reference RGA# LVR-49562|Y
01|69427|1|2|T32386 s/n: A0008|N
01|69427|3|1|Drive Shaft is damaged and must be replaced.|Y
01|69427|3|2|Collet nuts bearings seals and o-rings must be|Y
01|69427|3|3|replaced. Labor is included.|Y
01|69433|26|1|ETA Pending Factory|Y
01|69433|27|1|10pcs ETA aprox 3/8 Bal pending from factory|Y
01|69433|29|1|1pc Stock/ Balance ETA aprox 3/22|Y
01|69447|3|1|***Net Price***|Y
01|69447|3|2|Installation Scheduled ARO|Y
01|69448|1|1|Reference RGA# LVR-49528|Y
01|69448|1|2|MNL12-ER32Z-MS s/n: A2169|N
01|69448|3|1|Spindles and gears are damaged and must be replaced.|Y
01|69448|3|2|Collet nuts bearings seals and o-rings must also|Y
01|69448|3|3|be replaced. Labor is included.|Y
01|69448|3|4|There is significant damage to the housing and|Y
01|69448|3|5|bearings; however we would not be able to determine|Y
01|69448|3|6|if the unit is repairable until reassembly. However|Y
01|69448|3|7|this does not guarantee that the unit will be within|Y
01|69448|3|8|speicification if repairable. Replacement is|Y
01|69448|3|9|recommended.|Y
01|69448|5|1|Special discount applied due to tool being under one|Y
01|69448|5|2|year old as a one time courtesy.|Y
01|69449|26|1|ETA Pending Factory|Y
01|69449|27|1|10pcs ETA aprox 3/8 Bal pending from factory|Y
01|69449|29|1|1pc Stock/ Balance ETA aprox 3/22|Y
01|69453|1|1|Quoted at a net price|Y
01|69453|2|1|Quoted at a net price|Y
01|69468|1|1|Reference RGA# LVR-49570|Y
01|69468|1|2|OKU-L370MW-MN s/n: AL0030|N
01|69468|3|1|Collet nut bearings seals and o-rings must be|Y
01|69468|3|2|replaced. Labor is included.|Y
01|69481|2|1|Installation includes: Drive unit short bar fiber|Y
01|69481|2|2|optic cable communications cable bulkhead cables|Y
01|69481|2|3|external cables parameter changes service time and|Y
01|69481|2|4|travel.|Y
01|69482|3|1|Installation inlcudes: Drive unit short bar fiber|Y
01|69482|3|2|optic cables bulkhead cables external cables|Y
01|69482|3|3|parameter changes service time and travel.|Y
01|69483|5|1|Installation includes: Drive unit short bar fiber|Y
01|69483|5|2|optic cable communications cable bulkhead cables|Y
01|69483|5|3|external cables parameter changes service time and|Y
01|69483|5|4|and travel.|Y
01|69491|6|1|CAT40-SK16-180UP CAT40 SK16 Slim Chuck Max 20000rpm|Y
01|69491|22|1|Quoted in place of SK10-7/32 we do not carry a 7/32.|Y
01|69491|35|1|Replacement for SK16-7/32 we do not carry a 7/32..|Y
01|69492|2|1|CCK20-18|Y
01|69492|3|1|CKFN20(3/4)-18C|Y
01|69492|11|1|SKG13-10HG|Y
01|69492|35|1|CCK20-18|Y
01|69492|36|1|CKFN20(3/4)-18C|Y
01|69492|52|1|CCK20-18|Y
01|69492|53|1|CKFN20(3/4)-18C|Y
01|69492|68|1|CCK20-18|Y
01|69492|69|1|CKFN20(3/4)-18C|Y
01|69492|75|1|ALTERNATIVE G.L. to above|Y
01|69494|26|1|ETA Pending Factory|Y
01|69494|27|1|10pcs ETA aprox 3/8 Bal pending from factory|Y
01|69494|29|1|1pc Stock/ Balance ETA aprox 3/22|Y
01|69503|1|1|for the 5.1mm|Y
01|69503|2|1|for the 12.5mm|Y
01|69503|3|1|for the 3.5mm|Y
01|69507|1|1|4pcs available|Y
01|69507|3|1|1pc available|Y
01|69507|5|1|This holder cannot be modified to have coolant|Y
01|69507|5|2|ports!|Y
01|69511|19|1|MI50-TAP1/4 MI50 Tap 1/4 Quick Change Adapter|Y
01|69511|20|1|MI50-TAP5/16 MI50 Tap 5/16 Quick Change Adapter|Y
01|69511|21|1|MI50-TAP7/16 MI50 Tap 7/16 Quick Change Adapter|Y
01|69511|22|1|MI50-TAP9/16 MI50 Tap 9/16 Quick Change Adapter|Y
01|69511|23|1|MI50-TAP5/8 MI50 Tap 5/8 Quick Change Adapter|Y
01|69512|3|1|Quoted in consideration to 5/64=.078in|Y
01|69514|1|1|Quoted at a net price|Y
01|69516|1|1|CNC180ZA s/n: 20726T|Y
01|69517|1|1|Quoted at a net price|Y
01|69517|2|1|Quoted at a net price|Y
01|69533|1|1|Quoted at a net price|Y
01|69539|1|1|4pcs delivery 1-2wks|Y
01|69539|1|2|1pc delivery 10-11wks|Y
01|69541|11|1|This item is quoted as NET pricing|Y
01|69541|13|1|This item is quoted as NET pricing|Y
01|69550|5|1|*Haas Stud|Y
01|69553|1|1|Tooling Certificate Number: 13170-914-013017|Y
01|69555|5|1|MACHINE TO HAVE DDRT INTERFACE FROM FACTORY|Y
01|69555|5|2|INSTALLATION INCLUDES CABLES SERVO TRAVEL LABOR|Y
01|69555|8|1|EXTERNAL CABLE SET INCLUDING POWER/FEEDBACK|Y
01|69595|1|1|Weight 23.50lbs|Y
01|69595|2|1|Weight 25.30lbs|Y
01|69595|3|1|Weight 24.20lbs|Y
01|69595|4|1|Weight 24.75 lbs|Y
01|69600|16|1|for CCK3/4-6 collet|Y
01|69612|1|1|Price will be updated obtaining new cost.|Y
01|69617|3|1|From Refurbished Inventory|Y
01|69622|11|1|Cross from KMTL 1156350 BT30ER32070M (70mm / 2.75gl)|Y
01|69622|11|2|Lyndex-Nikken gage if 3|Y
01|69626|1|1|Table with Fanuc motor and AIR brake.|Y
01|69626|3|1|includes external power and feedback cables|Y
01|69632|1|1|Table with motor set up for Hurco VMC.|Y
01|69632|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|69632|2|2|external cable set communications cable parameter|Y
01|69632|2|3|changes travel and labor for installing one rotary|Y
01|69632|2|4|table on one Hurco VMC.|Y
01|69632|6|1|***OPTIONAL***|Y
01|69632|6|2|Outboard support table with bearing and brake. Also|Y
01|69632|6|3|matches CNC180 C/L height.|Y
01|69632|7|1|***OPTIONAL***|Y
01|69632|7|2|Manual Tailstock - Matches CNC180 C/L height.|Y
01|69636|1|1|HSK63F Special RAH for Robot Interface ER20 Output|Y
01|69636|1|2|No Coolant Max 10K RPM 15Nm|Y
01|69636|2|1|HSK63F Special RAH for Robot Interface ER20 Output|Y
01|69636|2|2|No Coolant Max 10K RPM 15Nm|Y
01|69636|4|1|HSK63F Special RAH for Robot Interface ER25 Output|Y
01|69636|4|2|No Coolant Max 8K RPM 30Nm|Y
01|69636|5|1|HSK63F Special RAH for Robot Interface ER25 Output|Y
01|69636|5|2|No Coolant Max 8K RPM 30Nm|Y
01|69643|1|1|NIKKEN TABLES IN STOCK. WE HAVE HAAS NEXT GENERATION|Y
01|69643|1|2|MOTOR IN STOCK. CAN SHIP 2-3 DAYS AFTER TEST po|Y
01|69643|1|3|THIS TABLE FOR AZIMUTH TESTING. 60 DAYS|Y
01|69643|1|4|IF TABLE EXCEEDS EXPECTATIONS THEN WILL BE PURCHASED|Y
01|69644|1|1|CONFIRM FIT ON MMACHINE TOOL CLEARANCE ETC|Y
01|69644|1|2|WORKHOLDING NOT DETERMINED OR QUOTED|Y
01|69647|1|1|Reference RGA# TAR-49544|Y
01|69647|1|2|5AX-130SA-BR s/n: 3748|N
01|69654|1|1|Table with A06B-0075-B003 x 2 Beta 8iS Motors|Y
01|69654|1|2|Standard Table|Y
01|69654|2|1|External Cable Set|Y
01|69654|2|2|Customer to provide Lengths upon reciept of order|Y
01|69654|2|3|Item is per Axis|Y
01|69654|3|1|Interface Cable Set|Y
01|69654|3|2|Customer to provide length upon reciept of order|Y
01|69654|3|3|Item is per Axis|Y
01|69658|1|1|Table with A06B-0075-B003 x 2 Beta 8iS Motors|Y
01|69658|2|1|External Cable Set (Power/Signal & Feedback)|Y
01|69658|2|2|Item is per Axis|Y
01|69658|2|3|Customer to specify length|Y
01|69658|2|4|Including scale cable wired with feedback/data cable|Y
01|69658|3|1|Interface Cable Set (Power/Signal & Feedback)|Y
01|69658|3|2|Price is per Axis|Y
01|69658|3|3|Customer to specify length|Y
01|69658|3|4|Including scale cable wired with feedback/data cable|Y
01|69658|4|1|Riser Plate to fit Scales @ 90mm Height|Y
01|69658|4|2|Item is NET charge|Y
01|69658|5|1|Scale Kit|Y
01|69658|5|2|Item is per Axis|Y
01|69658|5|3|Quoted as NET Charge|Y
01|69658|5|4|1 Kit for Rotary 1 Kit for Tilt|Y
01|69658|7|1|Air Purge System|Y
01|69658|7|2|Item is per Axis|Y
01|69658|9|1|Air Freight Charge to bring table to US from Japan|Y
01|69671|1|1|This item is not a standard stock item and considered|Y
01|69671|1|2|special. It is non-cancellable/non-returnable upon|Y
01|69671|1|3|reciept of a firm PO. The pricing on this quote is at|Y
01|69671|1|4|you NEW cost.|Y
01|69685|10|1|2pcs ETA aprox 2 weeks remaining balance ETA aprox|Y
01|69685|10|2|2-6 weeks.|Y
01|69685|11|1|2pcs stock remaining balance ETA aprox 2 weeks|Y
01|69691|1|1|Reference RGA# CUR-49497|Y
01|69691|1|2|C40RAM-ER16-180 s/n: 8472 02|N
01|69691|3|1|CAT40 spindle is damaged and msut be replaced.|Y
01|69691|3|2|Bearings seals and o-rings must also be replaced.|Y
01|69691|3|3|Labor is included.|Y
01|69716|1|1|Normal discount is 10% special discount of 25% is|Y
01|69716|1|2|as a courtesy.|Y
01|69738|3|1|FULL 4TH AXIS INSTALLATION ON EXISTING DOOSANS|Y
01|69738|3|2|HYDRAULIC SUPPLY AT APEX/COOPER|Y
01|69738|3|3|NOT RESPONSIBLE FOR FIXTURE|Y
01|69744|1|1|UNV #409 HSK63A-SF1000-3.375IDU|Y
01|69744|1|2|Ref drawing C6300 drawing for RFID Chip Installation|Y
01|69744|1|3|Chip must not protrude from flange.|Y
01|69744|1|4|Balanced to G2.5 to 20000 rpm after chip installation.|Y
01|69744|1|5|GKN to provide RFID chip.|Y
01|69746|1|1|Manual Load|Y
01|69746|2|1|#30-TESTBAR-8.00 No Flange Type|Y
01|69746|2|2|Manual Load|Y
01|69746|3|1|IT30-TESTBAR-8.00|Y
01|69746|3|2|ATC|Y
01|69766|1|1|Tooling Certificate Number: 13485-913-042617|Y
01|69775|1|1|Matches 8 010 250 119|Y
01|69787|1|1|1 - 49 pieces = 28%|Y
01|69787|1|2|50 + pieces = 33%|Y
01|69795|1|1|*Mold Type  - Coolant Through the Tool|Y
01|69795|3|1|*Coolant Flows a long flutes of tool|Y
01|69820|1|1|NCAT50 Taper Plus Special RAH 3 Pin Support for extra|Y
01|69820|1|2|Rigidity Tooling Interface for 1 1/4 Arbor|Y
01|69820|1|3|Max RPM 5000 Max TQ 150Nm|Y
01|69820|1|4|1pc pricing shown|Y
01|69820|3|1|NCAT50 Taper Plus Special RAH 3 Pin Support for extra|Y
01|69820|3|2|Rigidity Tooling Interface for 1 1/4 Arbor|Y
01|69820|3|3|Max RPM 5000 Max TQ 150Nm|Y
01|69820|3|4|2pc pricing shown (purchased for shipping at same time)|Y
01|69820|5|1|NCAT50 Taper Plus Special RAH 3 Pin Support for extra|Y
01|69820|5|2|Rigidity Tooling Interface for 1 1/4 Arbor|Y
01|69820|5|3|Max RPM 5000 Max TQ 150Nm|Y
01|69820|5|4|3pc pricing shown (purchased for shipping at same time)|Y
01|69820|7|1|Custom Positioning Block per specs from End User sent|Y
01|69820|7|2|to Tim Reeves of Lyndex-Nikken to build.|Y
01|69821|1|1|Table for TC-S2DN-O no motor no cable no drive unit|Y
01|69821|2|1|Including all necesary interface components|Y
01|69823|4|1|Net price|Y
01|69823|4|2|To be made by Lyndex-Nikken upon receipt of spindle|Y
01|69823|4|3|drawing information|Y
01|69825|7|1|This holder is not coolant capable.|Y
01|69834|1|1|R8 EndMill Holder ID = 20mm  L = 2.75|Y
01|69840|1|1|*qty break 1-19pcs|Y
01|69840|3|1|*qty break 20-29pcs|Y
01|69840|5|1|*qty break 30+pcs|Y
01|69846|1|1|Coolant Ports installed on HSK100A-SM1000-6.00|Y
01|69846|1|2|70$ net charge for modification|N
01|69846|2|1|Item to be modified with Coolant Ports|Y
01|69846|2|2|Quoted at a net price|Y
01|69846|4|1|Coolant ports installed on C5001-1250-1.75|Y
01|69846|5|1|Quoted at a net price|Y
01|69846|5|2|Coolant ports installed on holder|Y
01|69864|1|1|CNC202AA21-750W s/n: 26797TC|Y
01|69883|1|1|Special cable set made for CNC201 s/n: 8169 for|Y
01|69883|1|2|Cable to interface with Makino Machine.|Y
01|69883|1|3|Wiring Diagram is needed to complete this cable.|Y
01|69885|1|1|Pricing for this product is based on quantity quoted.|Y
01|69885|1|2|If quantity changes must requote pricing.|Y
01|69886|1|1|Price is based on quantity quoted. If quantities change|Y
01|69886|1|2|product must be requoted.|Y
01|69888|16|1|Alternative Stock consideration for E20-028(C)|Y
01|69902|1|1|Part#S.C6-SYJ18-42-6|Y
01|69909|1|1|HF-H104T-A48 MOTOR REQUIRED. WITH STANDARD MAZAK1|Y
01|69909|1|2|CONNECTOR WIRE HARNESS|Y
01|69909|3|1|FOR MAZAK. NEED TO CONFIRM WIRING INFO|Y
01|69910|1|1|TABLE TO REPLACE GOLDEN SUN TABLE BEING USED ON MAZAK|Y
01|69910|1|2|MARTRIX 410 A & B MACJHINES. WE WILL REQUIRE WIRE|Y
01|69910|1|3|SCHEMATICS OR SAMPLE TABLE TO DUPLICATE|Y
01|69922|1|1|Price does not include installation.|Y
01|69923|2|1|for a Haas VF-9/50|Y
01|69924|1|1|KM32-20.2|Y
01|69924|1|2|This is a Milling Chuck collet with a 32mm OD and a|Y
01|69924|1|3|20.2mm ID.|Y
01|69945|1|1|NET PRICING BASED ON 1 PC|Y
01|69945|1|2|Non-returnable Non-cancellable|Y
01|69945|2|1|NET PRICING based on 3 pcs|Y
01|69945|2|2|Non-returnable Non-cancellable|Y
01|69945|3|1|NET PRICING based on 6 pcs|Y
01|69945|3|2|Non-returnableNon-cancellable|Y
01|69951|1|1|Item was a used unit and was rebuilt by Alps Tool|Y
01|69951|1|2|Item would come with 1 year warranty.|Y
01|69954|3|1|H40E-SF0125-2.36|Y
01|69954|4|1|H40E-SF0125-5.12|Y
01|69954|11|1|H40E-SF0500-5.12|Y
01|69954|13|1|H40E-SF0625-5.12|Y
01|69965|2|1|This item is given in terms of NET price.|Y
01|69969|1|1|AC6-MTA3-130 Polygon C6 Morse Taper #3 Holder|Y
01|69969|1|2|for Mazak Integrex|Y
01|69969|1|3|Quoted as Net Price|Y
01|69997|3|1|NO CABLE MANAGEMENT WORKHOLDING SUBPLATE QUOTED|Y
01|69998|1|1|jEFFREYS TO SUPPLY MOTOR AND CABLES FOR LYNDEX NIKKEN|Y
01|69998|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|69998|1|3|CONFIRMATION OF PROPER FIT TO MACHINE MUST BE VERIFIED|Y
01|70005|1|1|NCAT50 Taper Plus Special RAH 3 Pin Support for extra|Y
01|70005|1|2|Rigidity Tooling Interface for 1 1/4 Arbor|Y
01|70005|1|3|Max RPM 5000 Max TQ 150Nm|Y
01|70005|1|4|1pc pricing shown|Y
01|70005|3|1|NCAT50 Taper Plus Special RAH 3 Pin Support for extra|Y
01|70005|3|2|Rigidity Tooling Interface for 1 1/4 Arbor|Y
01|70005|3|3|Max RPM 5000 Max TQ 150Nm|Y
01|70005|3|4|2pc pricing shown (purchased for shipping at same time)|Y
01|70005|5|1|NCAT50 Taper Plus Special RAH 3 Pin Support for extra|Y
01|70005|5|2|Rigidity Tooling Interface for 1 1/4 Arbor|Y
01|70005|5|3|Max RPM 5000 Max TQ 150Nm|Y
01|70005|5|4|3pc pricing shown (purchased for shipping at same time)|Y
01|70005|7|1|Custom Positioning Block per specs from End User sent|Y
01|70005|7|2|to Tim Reeves of Lyndex-Nikken to build. ETA time is|Y
01|70005|7|3|based on after all pertinent data has been provided|Y
01|70005|7|4|to Lyndex-Nikken and approval drawing is signed and|Y
01|70005|7|5|returned.|Y
01|70019|1|1|Repair of customer's C40RA-0025|Y
01|70019|1|2|Reference RGA# CUR-49565|Y
01|70019|8|1|Possibly may been to replace.  If repair is approved|Y
01|70019|8|2|and this item is not needed this will be removed from|Y
01|70019|8|3|the final invoice.|Y
01|70041|1|1|2x Motors in stock are used.|Y
01|70046|1|1|Repair of customer's T32373 s/n: A0122|Y
01|70046|1|2|Reference RGA# LVR-49614|Y
01|70046|2|1|Collet Nut bearings seals & o-rings must be replaced.|Y
01|70046|2|2|Price includes labor.|Y
01|70061|1|1|Repair of customer's OKL3-ER32X (OKU-L370-X) s/n: AL565|Y
01|70061|1|2|Reference RGA# LVR-49529|Y
01|70061|2|1|Collet nut bearings seals & o-rings must be replaced.|Y
01|70061|2|3|Labor is included.|Y
01|70061|3|1|Repair of customer's OKL3-ER32Z-OFMS s/n: AL137|Y
01|70061|3|2|(OKU-L370MW-DB)|Y
01|70061|4|1|Collet nut bearings seals & o-rings must be replaced.|Y
01|70061|4|2|Labor is included.|Y
01|70067|1|1|BT40-SK10-150-J w/Coolant Nut installed prior to ship|Y
01|70067|2|1|BT40-SK10-180-J w/Coolant Nut installed prior to ship|Y
01|70067|3|1|BT40-SK10-90-J w/Coolant Nut installed prior to ship|Y
01|70067|4|1|These will be installed on above holders prior to ship|Y
01|70072|1|1|*qty break 1-19pcs|Y
01|70072|3|1|*qty break 20-29pcs|Y
01|70072|5|1|*qty break 30+pcs|Y
01|70090|1|1|Repair of customer's MZQT47-ER16-AD-HS s/n: 74023 01|Y
01|70090|1|2|(Mim# 125054)|Y
01|70090|1|3|Reference RGA# LVR-49573|Y
01|70090|2|1|Gear set bearings seals & o-rings must be replaced.|Y
01|70090|2|2|Labor is included.|Y
01|70094|2|1|Arbor Screw to be slotted for coolant and installed at|Y
01|70094|2|2|Lyndex-Nikken prior to shipping.|Y
01|70094|2|3|Please reference Quote # on PO should you order.|Y
01|70096|2|1|TWIN SPINDLE TABLE WITH MELDAS MOTORS|Y
01|70096|3|1|DUAL TAILSTOCK/ DEAD CENTER WITH SUBPLATE|Y
01|70096|5|1|SIX JAW MANUAL CHUCK WITH ADAPTER PLATE|Y
01|70106|4|1|Shortest length available|Y
01|70111|1|1|ETA aprox 8-9 weeks Mfg. plus shipping time (to be|Y
01|70111|1|2|decided by customer)|Y
01|70111|2|1|This item is PENDING PRICE until more information is|Y
01|70111|2|2|recieved.|Y
01|70117|1|1|Quoted 1~4 tools.|Y
01|70117|2|1|Quoted 1~4 tools.|Y
01|70117|4|1|Quoted 5~14 tools.|Y
01|70117|5|1|Quoted 5~14 tools.|Y
01|70117|7|1|Quoted 15+ tools.|Y
01|70117|8|1|Quoted 15+ tools.|Y
01|70119|1|1|PART-MIM-138870: excentric bolt 12mm diameter|Y
01|70119|2|1|PART-MIM-138844: excentric bolt 16mm diameter|Y
01|70119|2|2|w/ arrester/stop bar|Y
01|70119|3|1|PART-MIM-114731: 44.912/4X16--Screw M4x16 12.9|Y
01|70123|1|1|*SEKTAM Pricing|Y
01|70146|1|1|NST 250 DISCONTINUED|Y
01|70146|5|1|POWER/FEEDBACK CABLE SET|Y
01|70150|1|1|Reference RGA# TAR-49611|Y
01|70150|1|2|5AX-120 s/n: 8316|N
01|70171|2|1|Delivery on the 2nd pc is 1-2 weeks from receipt of|Y
01|70171|2|2|approval to proceed.|Y
01|70177|1|1|Reference RGA# TAR-49580|Y
01|70177|1|2|NSVZ300A21 s/n: 2210H|N
01|70182|1|1|#40-TB40-300|Y
01|70182|1|2|40 Taper Testbar w/o Flange 300mm|Y
01|70182|1|3|Special order. Unit price of each.|Y
01|70182|1|4|Speical price if PO received by April/10/2017|Y
01|70182|2|1|#50-TB50-300|Y
01|70182|2|2|50 Taper Testbar w/o Flange 300mm|Y
01|70182|2|3|Special order. Unit price of each.|Y
01|70182|2|4|Special price if PO received by April/10/2017|Y
01|70186|8|1|COMMUNICATIONS CABLE  A660-2005-T626/L150R0A|Y
01|70190|3|1|NO CABLE MANAGEMENT WORKHOLDING SUBPLATE QUOTED|Y
01|70192|4|1|PC-CHK-ADAPTER-SP /Special A2-8 Adapter|Y
01|70199|1|1|10pcs stock remaining balance ETA aprox 9 weeks|Y
01|70201|1|1|2 Spindle Offset Custom Head ER8x2 1:3 Speeder|Y
01|70208|1|1|Max 6000Rpm - Mori Cross over for T32206|Y
01|70208|5|1|Max 10000 RPM|Y
01|70220|1|1|Reference RGA# TOR-49462|Y
01|70220|1|2|NC5-63S-F50-220-14|N
01|70257|1|1|NCAT50-HC6-6.00 TaperPlus50 6mm Hyd Chuck 6 GL|Y
01|70257|2|1|NCAT50-HC6-6.00 TaperPlus50 6mm Hyd Chuck 6 GL|Y
01|70257|3|1|NCAT50-HC8-6.00 TaperPlus50 8mm Hyd Chuck 6 GL|Y
01|70257|4|1|NCAT50-HC8-6.00 TaperPlus50 8mm Hyd Chuck 6 GL|Y
01|70257|5|1|NCAT50-HC10-6.00 TaperPlus50 10mm Hyd Chuck 6 GL|Y
01|70257|6|1|NCAT50-HC10-6.00 TaperPlus50 10mm Hyd Chuck 6 GL|Y
01|70257|7|1|NCAT50-HC12-6.00 TaperPlus50 12mm Hyd Chuck 6 GL|Y
01|70257|8|1|NCAT50-HC12-6.00 TaperPlus50 12mm Hyd Chuck 6 GL|Y
01|70257|9|1|NCAT50-HC14-6.00 TaperPlus50 14mm Hyd Chuck 6 GL|Y
01|70257|10|1|NCAT50-HC14-6.00 TaperPlus50 14mm Hyd Chuck 6 GL|Y
01|70257|11|1|NCAT50-HC16-6.00 TaperPlus50 16mm Hyd Chuck 6 GL|Y
01|70257|12|1|NCAT50-HC16-6.00 TaperPlus50 16mm Hyd Chuck 6 GL|Y
01|70257|13|1|NCAT50-HC18-6.00 TaperPlus50 18mm Hyd Chuck 6 GL|Y
01|70257|14|1|NCAT50-HC18-6.00 TaperPlus50 18mm Hyd Chuck 6 GL|Y
01|70257|15|1|NCAT50-HC20-6.00 TaperPlus50 20mm Hyd Chuck 6 GL|Y
01|70257|16|1|NCAT50-HC20-6.00 TaperPlus50 20mm Hyd Chuck 6 GL|Y
01|70268|2|1|1pc stock/ 2pc 3wks/ 4+pc 9-11wks|Y
01|70268|3|1|2 stock/ 6pc 3wks/ 8+pc 9-11wks|Y
01|70268|4|1|3pc 3/30  / 8pc 3wks / Bal 9-11wks|Y
01|70272|1|1|Alberti KZ-1513|Y
01|70272|2|1|Alberti KZ1510|Y
01|70282|5|1|FULL 4TH AXIS INSTALLATION ON EXISTING DOOSANS|Y
01|70282|5|2|HYDRAULIC SUPPLY AT APEX/COOPER|Y
01|70282|5|3|NOT RESPONSIBLE FOR FIXTURE|Y
01|70283|1|1|Reference RGA# TAR-49644|Y
01|70283|1|2|CNC200 s/n: 9538|N
01|70289|1|1|Quoted at Net Price|Y
01|70297|2|1|C40S7-0032-3.13|Y
01|70297|3|1|C40S7-0032-5.00|Y
01|70309|6|1|2pcs at factory with ETA aprox 2wks/Bal ETA aprox 12wks|Y
01|70313|2|1|Includes drive unit interface cabling travel labor|Y
01|70313|2|2|expenses|Y
01|70318|1|1|Reference RGA# TAR-49655|Y
01|70318|1|2|CNC260TA21 s/n: 1077|N
01|70320|5|1|*Must confirm 8mm shank and square of tap|Y
01|70320|6|1|*Must confirm 10mm shank and square of tap|Y
01|70320|7|1|*Must confirm 12mm shank and square of tap|Y
01|70320|9|1|Hydraulic not available. Please quote milling chuck|Y
01|70320|16|1|Crossover from PMC-20 see catalog page for details|Y
01|70320|17|1|*use to hold the S20-UMT probe|Y
01|70320|23|1|Mazak Machine per drawing provided from Kentech|Y
01|70352|2|1|A2-8 Chuck Adapter|Y
01|70352|3|1|Special Step-Down Draw Tube Honed|Y
01|70352|4|1|Thread Draw Nut M50 X 1.5|Y
01|70355|1|1|NCAT50 Taper Plus Special RAH 3 Pin Support for extra|Y
01|70355|1|2|Rigidity Tooling Interface for 1 1/4 Arbor|Y
01|70355|1|3|Max RPM 5000 Max TQ 150Nm|Y
01|70355|1|4|1pc pricing shown|Y
01|70355|3|1|NCAT50 Taper Plus Special RAH 3 Pin Support for extra|Y
01|70355|3|2|Rigidity Tooling Interface for 1 1/4 Arbor|Y
01|70355|3|3|Max RPM 5000 Max TQ 150Nm|Y
01|70355|3|4|2pc pricing shown (purchased for shipping at same time)|Y
01|70355|5|1|NCAT50 Taper Plus Special RAH 3 Pin Support for extra|Y
01|70355|5|2|Rigidity Tooling Interface for 1 1/4 Arbor|Y
01|70355|5|3|Max RPM 5000 Max TQ 150Nm|Y
01|70355|5|4|3pc pricing shown (purchased for shipping at same time)|Y
01|70355|7|1|Custom Positioning Block per specs from End User sent|Y
01|70355|7|2|to Tim Reeves of Lyndex-Nikken to build.|Y
01|70389|1|1|Mazak Special Speeder Tool|Y
01|70389|1|2|BMT8090degZ-Axis ER16 Output 1:4 Speeder|Y
01|70389|1|3|Max 3667 Input 15000 Output|Y
01|70391|2|1|Modification Charge for Nut Threading M60 x 1.5|Y
01|70392|7|1|MZST68-SK20X-ICE|Y
01|70392|8|1|MZST68-SK20Z-ICE|Y
01|70394|1|1|Tool #2|Y
01|70394|2|1|Tool #2-A|Y
01|70394|3|1|Tool #3|Y
01|70394|4|1|Tool #3|Y
01|70394|5|1|Tool #4|Y
01|70394|6|1|Tool #4|Y
01|70409|1|1|1-2 piece price.|Y
01|70409|3|1|This is a price break if all 3 tools are purchased|Y
01|70409|3|2|then customer may take this price.|Y
01|70412|1|1|Tool #1 S1005-0875-9.05 Repairable.|Y
01|70412|1|2|Reference RGA# TOR-49647|Y
01|70417|10|1|This will collapse down to 12mm.|Y
01|70418|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|70425|1|1|HSK63A(80)-C1.1/4-110G-IDU|Y
01|70425|1|2|Nikken Hi Speed Milling Chuck|Y
01|70445|5|1|Heidenhain scale kit for +/-3 seconds accuracy.|Y
01|70445|5|2|Includes: Scale scale mounting kit and cable.|Y
01|70445|6|1|Installation includes: Drive unit short bar fiber|Y
01|70445|6|2|optic cable communications cable bulkhead cables|Y
01|70445|6|3|external cables parameter changes service time and|Y
01|70445|6|4|travel.|Y
01|70445|7|1|expaning mandrel system with hydraulic pancake cylinder|Y
01|70445|7|2|per spindle.|Y
01|70445|8|1|hydraulic unit for pancake cylinders.|Y
01|70445|8|2|includes: hoses hand lever or solenoid and pressure|Y
01|70445|8|3|switch for M-code connection.|Y
01|70447|2|1|Delivery on 2nd cable is pending at this time.|Y
01|70453|3|1|Please Note: This toolholder is non standard stock.|Y
01|70453|3|2|Once a purchase order is placed it cannot be cancelled|Y
01|70453|3|3|or returned.|Y
01|70462|1|1|H63A-SF10-180|Y
01|70462|1|2|Minimum purchase quantity is 10pcs. This price reflects|Y
01|70462|1|3|a miminum 10pc. purchase.|Y
01|70462|3|1|H63A-SF10-180|Y
01|70462|3|2|Minimum purchase quantity is 10pcs. This price reflects|Y
01|70462|3|3|a miminum 20pc. purchase.|Y
01|70462|5|1|H63A-SF10-180|Y
01|70462|5|2|Minimum purchase quantity is 10pcs. This price reflects|Y
01|70462|5|3|a miminum 30pc. purchase.|Y
01|70466|1|1|Std Gage Length available 50mm|Y
01|70466|6|1|*Free knob with each matching CAT40 tool holder|Y
01|70476|1|1|IT40-PX6-150GX|Y
01|70476|2|1|ETS14-XXX collet|Y
01|70478|1|1|Repair of customer's CAT40-C1-85UG|Y
01|70478|1|2|Reference RGA# TOR-49583|Y
01|70480|1|1|Replacement table for CNC200FA S/N 9538|Y
01|70480|1|2|Lyndex to take existing Alpha 4/4000 motor and mate|Y
01|70480|1|3|to new CNC260FA.|Y
01|70485|1|1|Repair of customer's PF-2|Y
01|70485|1|2|Reference RGA# TOR-49572|Y
01|70514|1|1|SF-POT-HSK32 modified to HSK25E pot|Y
01|70520|1|1|Air Break|Y
01|70520|2|1|cable set up to 10ft (both axis)|Y
01|70520|3|1|installation & interface both axis (includes Fanuc|Y
01|70520|3|2|parts & axis card)|Y
01|70521|1|1|Fanuc Alpha4i motor|Y
01|70521|2|1|CNC-EXT-CABLE-R-ST|Y
01|70521|2|2|Cable setup to 10ft|Y
01|70521|3|1|EHU25M07AE30V-SET|Y
01|70521|4|1|Installation & Interface for FANUC 0iMD (both axis)|Y
01|70528|1|1|1-11pcs 35%|Y
01|70528|4|1|*Qty Break pricing  12+ 40%|Y
01|70540|4|1|Custom Positioning Block from specs to Tim Reeves|Y
01|70540|4|2|ETA is based on receipt of signed approval drawings|Y
01|70546|1|1|Reference RGA# TAR-49613|Y
01|70546|1|2|CNC260AA21-750W s/n: 9400C|N
01|70551|3|1|STANDARD NUTS TO BE SWAPPED OUT FOR THESE HEX PRIOR TO|Y
01|70551|3|2|SHIPPING. PLEASE REFERENCE THIS QHOTE NUMBER ON ORDER|Y
01|70551|3|3|AND MARK COMMENTS TO SWAP PRIOR TO SHIPPING.|Y
01|70559|63|1|Sub for TQW-SK16(43)|Y
01|70564|4|1|w/ PS-N46E pull stud installed|Y
01|70564|8|1|BRM-8.01|Y
01|70564|11|1|w/ PS-N46E pull stud installed|Y
01|70564|12|1|BRS-14.2|Y
01|70564|15|1|BRS-5.2|Y
01|70564|27|1|sub w/ B30-6000|Y
01|70564|28|1|BRS-5.05|Y
01|70564|29|1|BRS-6.9|Y
01|70564|31|1|BRS-7.15|Y
01|70564|33|1|BRS-9.7|Y
01|70564|35|1|w/ PS-123E pull stud installed|Y
01|70564|36|1|9MC25H-40L|Y
01|70564|37|1|S-NC5-46-FMA25.4-90 installed w/ PS-N46E|Y
01|70564|38|1|installed w/ PS-N46E|Y
01|70564|39|1|NBT30-SK13C-90|Y
01|70564|40|1|installed w/ PS-N6E pull stud|Y
01|70564|41|1|BRS-11.8|Y
01|70564|42|1|S-NC5-46-FMA31.75CS-45-M installed w/ PS-123E pull stud|Y
01|70564|43|1|installed w/ PS-N46E pull stud|Y
01|70564|45|1|installed w/ PS-N46E pull stud|Y
01|70580|3|1|A2-11 Adapter for H01MA12/Okuma LU4000EX|Y
01|70580|5|1|Draw Bar for Okuma LU4000EX|Y
01|70596|2|1|NET PRICE|Y
01|70596|6|1|NC50F1-40-60|Y
01|70599|1|1|Tooling Certificate Number: 13170-919-020217|Y
01|70601|2|1|Above boring unit is a replacement for M5L-2S|Y
01|70601|3|1|Above insert is replacement for 5P-F|Y
01|70616|1|1|Installed w/ Coolant Nut SKN-16BJ|Y
01|70616|2|1|**Installed at Lyndex-Nikken on CAT40-SK16-120U-IDU|Y
01|70616|19|1|*(machinable) by user for desired size|Y
01|70616|25|1|*(machinable) by user for desired size|Y
01|70616|27|1|*(machinable) by user for desired size|Y
01|70616|34|1|*customer must machine Blank w/ 3mm|Y
01|70616|37|1|*(machinable) by user for desired size|Y
01|70631|1|1|B5006-0375-2.75CP BT50-3/8 end mill holder|Y
01|70631|1|2|Coolant Port Modified.|Y
01|70631|3|1|B5016-0500-6.00  1/2 BT50 end mill holder|Y
01|70631|3|2|Coolant Port Modified.|Y
01|70631|5|1|B5006-0750-3.00CP 3/4 BT50 end mill holder|Y
01|70631|5|2|Coolant Port Modified.|Y
01|70637|1|1|BMT65 Special U-Tool|Y
01|70637|1|2|ER11 Output External Coolant Supply|Y
01|70637|1|3|1:2 Gear Ratio Max 3750 Input RPM 7500 Output|Y
01|70637|1|4|Max 10Nm Torque|Y
01|70638|1|1|Repair of Tool #1 PF-2 Version 1.|Y
01|70638|1|2|Reference RGA# TOR-49675|Y
01|70638|4|1|Labor charges are $110.00/hr.  This unit will require|Y
01|70638|4|2|1 1/2 hours of labor to repair and calibrate.|Y
01|70638|6|1|Repair of Tool #2 PF-2|Y
01|70638|9|1|Labor charges are $110.00/hr.  This unit will require|Y
01|70638|9|2|1 1/2 hours of labor to repair and calibrate.|Y
01|70648|1|1|Cross to Sandvik #AA3B20-40 25 044. Theirs is 1.75GL|Y
01|70648|1|2|Ours is 2GL and Coolant capable thru Spindle type.|Y
01|70648|2|1|Cross to Sandvik #AA3B05-40 19 038. Theirs is 1.5GL|Y
01|70648|2|2|Ours is 1.75GL and Coolant capable thru Spindle type.|Y
01|70648|3|1|Cross to Sandvik #AA3B05-40 25 051. Theirs is 2GL|Y
01|70648|3|2|Ours is 1.75GL and Coolant capable thru Spindle type.|Y
01|70653|1|1|ETA aprox-->8weeks mfg. plus shipping|Y
01|70670|1|1|CAT40 45deg Fixed Anglehead ER32 Torque rating 70Nm|Y
01|70670|1|2|per specs required by customer (ID140066)|Y
01|70670|1|3|Price based on 1pc purchase|Y
01|70670|3|1|CAT40 45deg Fixed Anglehead ER32 Torque rating 70Nm|Y
01|70670|3|2|per specs required by customer.  (ID140066)|Y
01|70670|3|3|Price based on 2pc purchase|Y
01|70674|1|1|Repair of customer's CAT50-C1-135U|Y
01|70674|1|2|Reference RGA# TOR-49694|Y
01|70677|1|1|Special Angle Head|Y
01|70677|1|2|WK-SW9-CAT50-ER40-I-SLL500|Y
01|70677|1|3|Special Order Unit Price Each.|Y
01|70681|3|1|Please Note: M0305-0562-4.72 is non standard stock.|Y
01|70681|3|2|Once a purchase order is placed it cannot be cancelled|Y
01|70681|3|3|or returned.|Y
01|70695|8|1|CAT40-SK10-180UP-IDU CAT40 SK10 Slim Chuck High Speed|Y
01|70695|8|2|ID Chip Hole|Y
01|70705|2|1|BDE79384|Y
01|70705|3|1|BDE79384|Y
01|70705|4|1|BDE79384(1)|Y
01|70705|5|1|BDE79384(1)|Y
01|70705|6|1|BDA12467|Y
01|70705|7|1|BDA12467|Y
01|70705|8|1|1 Wrench per Machine|Y
01|70705|11|1|23310635|Y
01|70705|12|1|23310635|Y
01|70705|13|1|23310635(1)|Y
01|70705|14|1|23310635(1)|Y
01|70705|15|1|23310635(2)|Y
01|70705|16|1|23310635(2)|Y
01|70705|17|1|AM27437|Y
01|70705|18|1|AM27437|Y
01|70705|19|1|AMS27437(1)|Y
01|70705|20|1|AMS27437(1)|Y
01|70705|21|1|BDA40583|Y
01|70705|22|1|BDA40583|Y
01|70705|23|1|AMS21725|Y
01|70705|24|1|AMS21725|Y
01|70705|25|1|Finish for Hex Crns|Y
01|70705|26|1|Finish for Hex Crns|Y
01|70705|27|1|BDA40583(1)|Y
01|70705|28|1|BDA40583(1)|Y
01|70705|29|1|(4) Wrenches for 4 machines|Y
01|70705|30|1|1 Wrench for 1 machine|Y
01|70705|33|1|AMW88340-41(VF6)|Y
01|70705|34|1|AMW88340-41(VF6)|Y
01|70705|35|1|AMW88340-41(VF6)(1)|Y
01|70705|36|1|AMW88340-41(VF6)(1)|Y
01|70705|37|1|AMW88340-41(VF6)(2)|Y
01|70705|38|1|AMW88340-41(VF6)(2)|Y
01|70705|39|1|84128495(VF6)|Y
01|70705|40|1|84128495(VF6)|Y
01|70705|41|1|84128495(VF6)(1)|Y
01|70705|42|1|84128495(VF6)(1)|Y
01|70705|43|1|84128495(VF6)(2)|Y
01|70705|44|1|84128495(VF6)(2)|Y
01|70705|45|1|84128495(VF6)(3)|Y
01|70705|46|1|84128495(VF6)(3)|Y
01|70705|47|1|AMW82544(VF6)|Y
01|70705|48|1|AMW82544(VF6)|Y
01|70705|49|1|AMW82544(VF6)(1)|Y
01|70705|50|1|AMW82544(VF6)(1)|Y
01|70705|51|1|AMW82544(VF6)(2)|Y
01|70705|52|1|AMW82544(VF6)(2)|Y
01|70705|53|1|3 Wrenchs for 3 Machines|Y
01|70705|56|1|AMY71555(VF4)|Y
01|70705|57|1|AMY71555(VF4)|Y
01|70705|58|1|AMY71555(VF4)(1)|Y
01|70705|59|1|AMY71555(VF4)(1)|Y
01|70705|60|1|AMY71555(VF4)(2)|Y
01|70705|61|1|AMY71555(VF4)(2)|Y
01|70705|62|1|AMY71555(VF4)(3)|Y
01|70705|63|1|AMY71555(VF4)(3)|Y
01|70705|64|1|AMW82511-13|Y
01|70705|65|1|AMW82511-13|Y
01|70705|66|1|AMW82511-13(1)|Y
01|70705|67|1|AMW82511-13(1)|Y
01|70705|68|1|AMW82511-13(2)|Y
01|70705|69|1|AMW82511-13(2)|Y
01|70705|70|1|AMW82511-13(3)|Y
01|70705|71|1|AMW82511-13(3)|Y
01|70705|72|1|BDC04712|Y
01|70705|73|1|BDC04712|Y
01|70705|74|1|BDC04712(1)|Y
01|70705|75|1|BDC04712(1)|Y
01|70705|76|1|BDC04712(2)|Y
01|70705|77|1|BDC04712(2)|Y
01|70705|78|1|BDC04712(3)|Y
01|70705|79|1|BDC04712(3)|Y
01|70705|80|1|BDC04712(4)|Y
01|70705|81|1|BDC04712(4)|Y
01|70705|82|1|BDA12718-21|Y
01|70705|83|1|BDA12718-21|Y
01|70705|84|1|BDE672292-96|Y
01|70705|85|1|BDE672292-96|Y
01|70705|86|1|BDE672292-96(1)|Y
01|70705|87|1|BDE672292-96(1)|Y
01|70705|88|1|BDE672292-96(2)|Y
01|70705|89|1|BDE672292-96(2)|Y
01|70705|90|1|BDH12343|Y
01|70705|91|1|BDH12343|Y
01|70705|92|1|BDH19184|Y
01|70705|93|1|BDH19184|Y
01|70705|94|1|23310595-96|Y
01|70705|95|1|23310595-96|Y
01|70705|96|1|4 Wrenches for 4 Machines|Y
01|70705|97|1|4 Wrenches for 4 Machines|Y
01|70709|1|1|3pcs stock remaining balance ETA aprox 8 weeks|Y
01|70716|15|1|Should they decide to go with SZF10 holder I will|Y
01|70716|15|2|provide the wrench as complimentary no charge. LAC|Y
01|70717|3|1|special discount if 10pcs purchased at once|Y
01|70724|3|1|NET PRICING|Y
01|70728|2|1|Gage Length 2.25|Y
01|70733|1|1|TO BE MODIFIED FOR 5.51 CENTERHEIGHT. CENTER HEIGHT OF|Y
01|70733|1|2|MR200 MAZAK TABLE|Y
01|70755|1|1|TOOL-CERT Number:5411-926-022317|Y
01|70764|1|1|Tool quoted at net price.|Y
01|70765|2|1|Includes Tool Setter and accessories|Y
01|70765|3|1|Installation of Tool Setter & Spindle Probe Above|Y
01|70765|3|2|Includes service tech's time + hardware that is needed.|Y
01|70809|1|1|Qty Break Pricing: 1-3pcs|Y
01|70809|2|1|Qty Break Pricing: 4-8pcs|Y
01|70809|3|1|Qty Break Pricing: 9+pcs|Y
01|70809|12|1|Qty Break Pricing: 4-8pcs|Y
01|70809|13|1|Qty Break Pricing: 9+pcs|Y
01|70821|1|1|To be DIN Burn modified with Coolant ports|Y
01|70821|3|1|To be DIN Burn modified with Coolant ports|Y
01|70821|5|1|To be DIN Burn modified with Coolant ports|Y
01|70821|7|1|To be DIN Burn modified with Coolant ports|Y
01|70827|1|1|P/N:HW-SJ-10-HS-1.5S-45|Y
01|70827|1|2|Part number referenced as HR-147-2.5 Steel soft jaw 12|Y
01|70827|1|3|The H027M Chuck is now standard H037M|Y
01|70827|1|4|NOTE: Pricing is for 1 piece. 1 Set = 3 pieces.|Y
01|70834|1|1|Taper Plus CAT50 Tool Package|Y
01|70835|1|1|HW-15C-OS-R938  1.5mm Serrated|Y
01|70835|1|2|H01MA15 R-938 for Okuma 2SP-V40|Y
01|70837|6|1|This holder requires a different wrench 16-NASPAN.|Y
01|70844|1|1|7 Rotary table w/motor|Y
01|70844|2|1|Cable setup to 10ft|Y
01|70844|3|1|installation & Interface of 4th axis (x2)|Y
01|70849|1|1|Quoted at a net price|Y
01|70849|1|2|Non-returnable and non-cancellable|Y
01|70856|2|1|Installation includes: Drive unit short bar fiber|Y
01|70856|2|2|optic cables communications cables bulkhead cables|Y
01|70856|2|3|external cables parameter changes service time and|Y
01|70856|2|4|travel.|Y
01|70860|3|1|Installation includes: Drive unit short bar fiber|Y
01|70860|3|2|optic cable communications cable bulkhead cable|Y
01|70860|3|3|exteranl cable parameter changes service time and|Y
01|70860|3|4|travel.|Y
01|70874|5|1|Replacing needed bearings seals and o-rings for both|Y
01|70874|5|2|rotary and tilt axis.|Y
01|70874|6|1|Brake parts for both rotary and tilt axis must be|Y
01|70874|6|2|replaced.|Y
01|70874|7|1|Tilt axis worm wheel and worm screw are worn|Y
01|70874|7|2|and must be replaced.|Y
01|70874|8|1|Rotary axis worm wheel and worm screw are worn|Y
01|70874|8|2|and must be replaced.|Y
01|70910|1|1|H047M is a discontinued modelThe replacement model is|Y
01|70910|1|2|H034M8|Y
01|70910|2|1|Net price quoted|Y
01|70913|1|1|3J Round Collet 1.086 ID SIZE|Y
01|70913|1|2|Non-returnable Non-cancellable|Y
01|70935|1|1|This product is given in terms of NET price.|Y
01|70949|2|1|HSK63A-SK10C-90P|Y
01|70950|1|1|Reference RGA# TAR-49688|Y
01|70950|1|2|1x CNCZ180 s/n: 12240|N
01|70956|1|1|Reference RGA# TAR-49544|Y
01|70956|1|2|5AX-130SA-BR s/n: 3777|N
01|70958|1|1|Reference RGA# TAR-49693|Y
01|70958|1|2|5AX-201 s/n: 1104|N
01|70961|1|1|Special Pricing for repeat order.|Y
01|70973|6|1|Service call to replace existing external cable set.|Y
01|70973|6|2|Includes travel time.|Y
01|70977|2|1|500 psi cylinder with drawtube and nose piece|Y
01|70987|1|1|500MM table with Top Mount Fanuc motor|Y
01|70988|1|1|Includes HAAS Sigma 1 motors and cables|Y
01|71007|1|1|Special HSK63A-Testbar-6.00 X1.00 Diameter|Y
01|71013|1|1|PART-MIM-138870: 12mm Eccentric Bolt|Y
01|71013|2|1|PART-MIM-138844: 16mm Eccentric Bolt|Y
01|71013|3|1|PART-MIM-114731: M4x16 Screw|Y
01|71029|2|1|Discount reflects a purchase order of 2 or more.|Y
01|71062|1|1|Reference RGA# TAR-49714|Y
01|71062|1|2|Repair of 5AX-2MT-105-120FA s/n: 8138|N
01|71062|37|1|Both Rotary spindles have dimples from thrust bearings.|Y
01|71062|37|2|These must be plated and reground.|Y
01|71062|37|3|3 Week delivery.|Y
01|71064|1|1|NKA01-42020: DRIVE SHAFT|Y
01|71064|2|1|NKA01-42030: Inner Collar|Y
01|71064|3|1|NKA01-42040: Outer Collar|Y
01|71068|1|1|Direct ship by DHL from Japan to Cordoba Argentina|Y
01|71070|1|1|Reference RGA# TAR-49763|Y
01|71070|1|2|Tool #1: Jaw worn out.|Y
01|71070|2|1|Labor charges for tool #1.|Y
01|71070|2|2|Jaws must also be replaced customer is sending in|Y
01|71070|2|3|their jaws originally purchased on Inv# 2117066 to use.|Y
01|71070|6|1|Tool #5: Jaw worn out.|Y
01|71070|7|1|Labor charges for tool #5.|Y
01|71070|7|2|Jaws must also be replaced customer is sending in|Y
01|71070|7|3|their jaws originally purchased on Inv# 2117066 to use.|Y
01|71070|9|1|Returning 2x CAT50-NPU13-90U un-repaired and|Y
01|71070|9|2|disassembled. Customer has declined repair and|Y
01|71070|9|3|replacement Inspection fee of $50.00 Net each.|Y
01|71070|9|4|Also returning 1x Drill Chuck this was not evaluated|Y
01|71070|9|5|as this is not a Lyndex-Nikken unit.  No inspection fee|Y
01|71070|9|6|incurred.|Y
01|71070|10|1|Inspection for 2x CAT50-NPU13-90U customer has|Y
01|71070|10|2|declined the repair and replacement.  These will be|Y
01|71070|10|3|returned dis-assembled.|Y
01|71073|1|1|Repair of customer's FP-2|Y
01|71073|1|2|Reference RGA# TOR-49678|Y
01|71073|3|1|Batteries must also be replaced.|Y
01|71073|4|1|Labor quoted for calibration.|Y
01|71096|1|1|ER40 Flange Mount Tool|Y
01|71096|3|1|ER40 Flange Mount Tool|Y
01|71096|5|1|ER40 Flange Mount Tool|Y
01|71133|1|1|Repair of customer's 2x OKL3-ER32X s/n: AL857/AL473|Y
01|71133|1|2|Reference RGA# LVR-49676|Y
01|71133|2|1|Bearings seals o-rings collet nut & clutch must|Y
01|71133|2|2|be replaced. Price includes labor.|Y
01|71140|1|1|Std Gage Length available 50mm|Y
01|71140|6|1|*Free knob with each matching CAT40 tool holder|Y
01|71146|3|1|Additional 2% discount allowed if all 9pcs on our shelf|Y
01|71146|3|2|are purchased at once.|Y
01|71199|1|1|Reference RGA# TOR-49590|Y
01|71199|1|2|#1 CAT40-NPU8-80U|N
01|71199|5|1|Returning unrepairable CAT40-NPU8-80U disassembled.|Y
01|71199|5|2|Inspection fee has been waived as a one-time courtesy.|Y
01|71225|1|1|OKEX-ER25X-ICE-HS 1:2|Y
01|71225|1|2|Looking to hold up to  1/4 drill max. Drilling|Y
01|71225|1|3|Stainless.|Y
01|71232|1|1|Reference RGA# TAR-49699|Y
01|71232|1|2|5AX-130FA s/n: 1171|N
01|71232|31|1|Rotary axis internal wire harness|Y
01|71232|32|1|Tilt axis internal wire harness|Y
01|71236|1|1|1pc stock|Y
01|71242|2|1|NIKKEN ROTARY TABLE MODEL CNCZ-180LSA|Y
01|71242|2|2|MOTOR BELOW. TO BE ORDER SEPERATE PO|Y
01|71265|1|1|NCAT40-SF8-6.30 special shrink fit 8mm w 6.30 g.l.|Y
01|71301|1|1|HFO TO PROVIDE LYNDEX NIKKEN MOTOR AND CABLES|Y
01|71301|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|71317|4|1|I only have 14 of these holders and they have a 2.00|Y
01|71317|4|2|gage length. I am not sure if your customer will accept|Y
01|71317|4|3|these but it is worth a try.|Y
01|71318|1|1|Below are approximate costs|Y
01|71318|1|2|Hotel: $200/night|Y
01|71318|1|3|Transit Time: 12 hours round trip x $100/hr = $1200|Y
01|71318|1|4|Gas Milage Cost:  Approx $300 round trip|Y
01|71318|1|5|Meals: $75.00/day|Y
01|71318|2|1|Approx time to install new Dog on 5AX-201HFA-M|Y
01|71318|2|2|Test Run and ensure in working order.|Y
01|71318|2|3|Will need tech to assist with any Machine side issues|Y
01|71326|1|1|Repair of customer's PF-2|Y
01|71326|1|2|Reference RGA# TOR-49725|Y
01|71326|2|1|Batteries must be replaced.|Y
01|71326|3|1|Unit must be recalibrated|Y
01|71331|1|1|H09M10 U-585 10 6-jaw power chuck For  MORI NLX2500|Y
01|71331|1|2|with A8J adapter.|Y
01|71331|1|3|Quoted at Net Price|Y
01|71331|3|1|H09M8 U-584 8 6-jaw power chuck For  MORI NLX2500|Y
01|71331|3|2|A5J adapter included|Y
01|71331|3|3|Quoted at Net Price|Y
01|71332|1|1|HFO TO PROVIDE LYNDEX NIKKEN MOTOR AND CABLES|Y
01|71332|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|71349|1|1|Repair of customer's NC5-63-AHK10-160-55 s/n: AeL-7020|Y
01|71349|1|2|Reference RGA# TAR-49717|Y
01|71349|3|1|NC5-63-AF-170-45 Main Body|Y
01|71349|13|1|#40-AH-45-KEY|Y
01|71352|5|1|Discount reflects core trade in.|Y
01|71352|11|1|Discount reflects core trade in.|Y
01|71352|14|1|Discount reflects core trade in.|Y
01|71352|15|1|Discount reflects core trade in.|Y
01|71364|1|1|Lyndex Nikken Tooling Certificate with a face value of|Y
01|71364|1|2|$10000|Y
01|71365|4|1|Special 10-20ft long cable set for bridge center|Y
01|71369|1|1|Repair of customer's MNL12-ER11(X)-SUB-SP 183938|Y
01|71369|1|2|S/N: 61831 01|Y
01|71369|1|3|Reference RGA# CUR-49630|Y
01|71369|2|1|ER spindle 1 gear bearings seals and o-rings must|Y
01|71369|2|2|all be replaced.|Y
01|71369|2|3|Pricing included labor|Y
01|71369|2|4|Delivery is 10-11 weeks from receipt of a PO.|Y
01|71372|4|1|15'to 20' extened lenght cable sets|Y
01|71372|9|1|Includes Drive Unit Short Bar Fiber Optic Cables|Y
01|71372|9|2|External and Interface Cables Parameter Changes|Y
01|71372|9|3|Technician Travel Expenses and Labor Expenses|Y
01|71373|1|1|Repair of customer's MNL12-ER11(X)-SUB-SP 183938|Y
01|71373|1|2|s/n: NA|Y
01|71373|1|3|Reference RGA# CUR-49743|Y
01|71373|2|1|ER spindle along with thread rings bearings seals|Y
01|71373|2|2|and o-rings must all be replaced.|Y
01|71373|2|3|Labor is included.|Y
01|71373|2|4|Delivery will be 4-5 weeks|Y
01|71379|1|1|NMTB50-NX4-192 Speeder|Y
01|71398|1|1|Repair of customer's NMTB40-NPU13-86|Y
01|71398|1|2|Reference RGA# TOR-49718|Y
01|71398|3|1|Delivery will be 2-3 days from receipt of PO.|Y
01|71407|1|1|Possible delivery mid-end of April.|Y
01|71408|4|1|TCD-F2045|Y
01|71408|4|2|2P Rotary Joint for DD250-150|Y
01|71408|5|1|TCD-37153/2|Y
01|71408|5|2|3Port Rotary Joint for TAT170|Y
01|71421|2|1|Quoted at a net price|Y
01|71421|2|2|Non-returnable and non-cancellable once a purchase|Y
01|71421|2|3|order has been issued.|Y
01|71422|3|1|These two holders had been demo'd at IMTS with a tool|Y
01|71422|3|2|shrunk into the holder but never put into a spindle or|Y
01|71422|3|3|used.|Y
01|71422|6|1|These two holders had been demo'd at IMTS with a tool|Y
01|71422|6|2|shrunk into the holder but never put into a spindle or|Y
01|71422|6|3|used.|Y
01|71422|13|1|I will offer these retention knobs at $5.00 NET COST EA|Y
01|71422|13|2|if they will accept the DEMO tooling pieces shown on|Y
01|71422|13|3|this quote!|Y
01|71424|1|1|Original unit sent in for evaluation/repair was crashed|Y
01|71424|1|2|Bore is collapsed this is unrepairable.|Y
01|71424|1|3|Reference RGA# TOR-49734|Y
01|71444|1|1|1:2 Axial Speeder for Okuma LB3000EX-II. ICE ER|Y
01|71444|1|2|ETA aprox 8 weeks plus shipping.|Y
01|71444|1|3|OKEX-ER25Z-ICE-HS|Y
01|71444|4|1|1:2 radial speeder for Okuma LB3000EX-II. ICE  ER|Y
01|71444|4|2|ETA aprox 8 weeks plus shipping.|Y
01|71444|4|3|OKEX-ER25X-ICE-HS|Y
01|71444|7|1|1:2 radial speeder for Okuma LB3000EX-II. ICE SK|Y
01|71444|7|2|ETA aprox 8 weeks plus shipping.|Y
01|71444|7|3|OKEX-SK20X-ICE-HS|Y
01|71444|10|1|1:2 axial speeder for Okuma LB3000EX-II. ICE SK|Y
01|71444|10|2|ETA aprox 8 weeks plus shipping|Y
01|71444|10|3|OKEX-SK20Z-ICE-HS|Y
01|71447|8|1|G/L = 2.50 Alternative stock to C4006-0125-2.36|Y
01|71447|23|1|Alternative to stock for E11-010|Y
01|71453|1|1|HSK63F/LPM-C3/4-95G Nikken Milling Chuck 3/4 x 95mm|Y
01|71453|1|2|gage length. Makino Pins Installed/High Speed|Y
01|71453|1|3|Net price quoted 1~5 holders.|Y
01|71453|3|1|HSK80F-LPM-C3/4-95G Nikken Milling Chuck 3/4 x 95mm|Y
01|71453|3|2|gage length. Makino Pins Installed/ Hi-Speed|Y
01|71453|3|3|Net price quoted 1~5 holders.|Y
01|71454|2|1|Cable setup to 10ft|Y
01|71454|3|1|Installation and interface for Fanuc|Y
01|71454|3|2|Price includingf labor travel and all expenses|Y
01|71454|3|3|Machine must have servo amp|Y
01|71497|1|1|Repair of Tool #1 CAT40-C3/4-85UG|Y
01|71497|1|2|Reference RGA# TOR-49724|Y
01|71497|1|3|Delivery: 3-5 business days|Y
01|71497|8|1|Repair of Tool #2 CAT40-C3/4-85UG|Y
01|71497|8|2|Delivery: 3-5 business days|Y
01|71500|1|1|Discount reflects Core Trade In|Y
01|71500|4|1|Discount reflects Core Trade In|Y
01|71502|1|1|Additional 5% discount quoted to purchase replacement|Y
01|71502|1|2|of a crashed unit.|Y
01|71505|1|1|Quoted at a net price|Y
01|71505|1|2|Non-returnable and non-cancellable|Y
01|71508|1|1|Tooling Certificate Number: E13100-662-072715|Y
01|71517|1|1|Repair of customer's PF-2|Y
01|71517|1|2|Reference RGA# TOR-49779|Y
01|71517|6|1|Labor charges are $110.00/hr this repair will be|Y
01|71517|6|2|1.5 hours.|Y
01|71526|1|1|Repair of customer's MNL12-ER32X S/N: A7530|Y
01|71526|1|2|Reference RGA# LVR-49758|Y
01|71526|2|1|Collet nuts bearings seals and o-rings must be|Y
01|71526|2|2|replaced. Labor is included.|Y
01|71528|1|1|Repair of customer's T23294 s/n: A0024|Y
01|71528|1|2|Reference RGA# LVR-49764|Y
01|71528|2|1|Spindle bearings seals and o-rings must be replaced.|Y
01|71528|2|2|Labor is included.|Y
01|71528|3|1|Repair of customer's T32394 s/n: A0025|Y
01|71528|4|1|Spindle bearings seals and o-rings must be replaced.|Y
01|71528|4|2|Labor is included.|Y
01|71530|1|1|Repair of customer's MNZ20-ER25Z (T32275) s/n: A0153|Y
01|71530|1|2|Reference RGA# LVR-49768|Y
01|71530|2|1|Spindle shaft bearings seals and o-rings must be|Y
01|71530|2|2|replaced.  Labor is included.|Y
01|71532|1|1|Repair of customer's OKL3-ER32X (OK101-14000) s/n:A1199|Y
01|71532|1|2|Reference RGA# LVR-49761|Y
01|71532|2|1|Clutch collet nut bearings seals and o-rings must|Y
01|71532|2|2|be replaced. Labor is included.|Y
01|71532|3|1|45% discount quoted for core trade-in.|Y
01|71532|3|2|Delivery is pending at this time.|Y
01|71532|3|3|This can be used to replace the non-Alps unit sent in.|Y
01|71533|8|1|Modified to C5|Y
01|71535|1|1|Quoted at a net price for 12pc set|Y
01|71537|3|1|Howa# H3YS10 A6J (A2-6) adapter|Y
01|71537|5|1|HW-SJ2-10-DOD  Howa# H3YS10 Soft Jaws|Y
01|71537|5|2|pricing is for 1 set=3pcs|Y
01|71544|1|1|ETA 10 WEEKS|Y
01|71544|1|2|Quoted as NET Pricing Non-returnable Non-cancelable|Y
01|71544|2|1|Quoted as NET Pricing Non-returnable Non-cancelable|Y
01|71544|2|2|ETA 10 WEEKS|Y
01|71544|3|1|Quoted as NET Pricing Non-returnable Non-cancelable|Y
01|71544|3|2|ETA 10 WEEKS|Y
01|71548|1|1|1 free pull stud for every 1 tool holder purchased.|Y
01|71550|1|1|w/ PS-N63AE Installed at factory prior to shipping.|Y
01|71570|1|1|Replacement for CAT40-UMT200U except the UMT200UW has|Y
01|71570|1|2|Stylus: 6mm Cyl. 44mm OD.|Y
01|71583|1|1|Pricing reflects Shrink Fit Package which includes|Y
01|71583|1|2|Shrink Unit Cooling Unit 5-Piece Induction Ring Set|Y
01|71583|1|3|5-Piece Cooling Bracket Set Storage Racks and 10|Y
01|71583|1|4|HSK100A Standard Shrink Fit Holders (reference attached|Y
01|71583|1|5|flyer).|Y
01|71584|1|1|CAT50 ER40 RAH Slim Type 110mm Taper Positioning Pin|Y
01|71584|1|2|+ 3 Pin Support Max 150Nm 5000 RPM|Y
01|71584|3|1|CAT50 MI63 RAH Standard Type 110mm Taper Positioning|Y
01|71584|3|2|Pin  + 3 Pin  Support Max 150 Nm 5000 RPM|Y
01|71588|3|1|Modification Charge for Nut Threading if necessary|Y
01|71613|1|1|Repair of customer's C50S5-1375-5.75|Y
01|71613|1|2|Reference RGA# TOR-49791|Y
01|71615|1|1|Reference RGA# TAR-49750|Y
01|71615|1|2|5AX-201FA-M s/n: 5495|N
01|71615|26|1|Expedite fee for 5AX-201FA-M Table is $1500.00.|Y
01|71615|26|2|Customer's table only requires tilt side repair and|Y
01|71615|26|3|rotary side backlash adjustment.|Y
01|71615|26|4|Expedite fee quoted to have table completed within|Y
01|71615|26|5|3-4 business days from receipt of PO to proceed.|Y
01|71615|26|6|Normal repair time is 2 weeks.|Y
01|71619|1|1|P/N:HW-SJ-10-HS-1.5S-45|Y
01|71619|1|2|Part number referenced as HR-147-2.5 Steel soft jaw 12|Y
01|71619|1|3|The H027M Chuck is now standard H037M|Y
01|71619|1|4|NOTE: Pricing is for 1 piece. 1 Set = 3 pieces.|Y
01|71623|1|1|Unit Price Each. Special Order.|Y
01|71623|1|2|Motor is included (Fanuc)|Y
01|71623|2|1|Unit Price Each. Special Order.|Y
01|71623|2|2|Motor is included (Fanuc)|Y
01|71629|1|1|Quoted as NET pricing|Y
01|71647|2|1|HW-12C-OS-R3648  (1.5mm serrated)|Y
01|71656|1|1|Reference RGA# TAR-49775|Y
01|71656|1|2|5AX-151ZA s/n: 0017|N
01|71680|2|1|4pcs currently in stock at factory-ETA 1-2 weeks ARO|Y
01|71680|2|2|Balance 1pc aprox 10 weeks ARO|Y
01|71682|2|1|This item is non standard stock once a purchase order|Y
01|71682|2|2|is placed it cannot be cancelled or returned.|Y
01|71712|1|1|BT45-SCA31.75-90|Y
01|71712|1|2|BT45-1.1/4 StubMill Holder|Y
01|71717|1|1|ETA 12 WEEKS|Y
01|71738|1|1|MBT50-FMA47.625-75|Y
01|71738|1|2|3-Lock Face Mill Arbor|Y
01|71739|3|1|1 gallon Mobil Gear Oil 600XP 68|Y
01|71741|1|1|MBT50-FMA47.625-75|Y
01|71741|1|2|3-Lock Face Mill Arbor|Y
01|71751|1|1|K32-SK16-180   32mm Straight Shank SK 16 holder.|Y
01|71751|1|2|This item is non standard stock once a purchase order|Y
01|71751|1|3|is placed it cannot be cancelled or returned.|Y
01|71751|1|5|Quoted at a net price|Y
01|71751|3|1|Quoted at a net price|Y
01|71753|1|1|Sandvik P/N:CX-TRE-XXXXA-DT External OD Turning|Y
01|71753|2|1|Sandvik P/N: Cx-TRI-xxxxA-DT Internal-ID Turning|Y
01|71753|3|1|Sandvik P/N: Cx-DTI-xxxx-DTE I Driven|Y
01|71760|1|1|HFO TO SUPPLY MOTOR AND CABLE|Y
01|71763|1|1|BMT68 Mazak (12ST) QTU250/QTU350|Y
01|71763|1|2|**Internal Coolant    *can run DRY 24/7*|Y
01|71770|1|1|ETA aprox 8 weeks plus shipping.|Y
01|71772|1|1|BMT68 Mazak (12ST) QTS250M|Y
01|71772|1|2|**Internal Coolant    *can run DRY 24/7*|Y
01|71773|4|1|This is being quoted as a Special for 1pc. Should they|Y
01|71773|4|2|increase the quantity it may change the NET COST and|Y
01|71773|4|3|a new quote put through.|Y
01|71804|17|1|*Sub for C4006-0125-2.36|Y
01|71807|1|1|We have 1pc coming from Alps Japan 4-20-2017|Y
01|71810|3|1|Adapter for HW-08-KS|Y
01|71810|5|1|Drawtube for HW-08-KS|Y
01|71814|1|1|One Time Price for Test|Y
01|71814|1|2|Item Non-Returnable and Non-Refundable|Y
01|71816|1|1|HFO TO PROVIDE LYNDEX NIKKEN MOTOR AND CABLES|Y
01|71816|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|71820|1|1|BT50-AHT30-260-90V|Y
01|71820|1|2|Quick Type Angle Head|Y
01|71820|1|3|GL Tolerance =/-0.001|Y
01|71820|2|1|AHK30S-C16-50|Y
01|71820|2|2|Adapter|Y
01|71820|3|1|AHK30S-C12-50|Y
01|71820|3|2|Adapter|Y
01|71820|4|1|BT50-AHK16-260-90V|Y
01|71820|4|2|Solid Angle Head|Y
01|71820|4|3|GL Tolerance +/-0.001|Y
01|71849|1|1|Reference RGA# TAR-49775|Y
01|71849|1|2|5AX-151ZA s/n: 0017 table sent in for evaluation.|Y
01|71849|4|1|Replacing bearings seals and o-rings on both|Y
01|71849|4|2|rotary and tilt axis.|Y
01|71849|5|1|Brake parts for both rotary and tilt axis must be|Y
01|71849|5|2|replaced.|Y
01|71849|6|1|Rotary axis worm wheel and worm screw are damaged.|Y
01|71849|6|2|These must be replaced.|Y
01|71849|7|1|Tilt axis worm wheel and worm screw are worn|Y
01|71849|7|2|and must be replaced.|Y
01|71849|9|1|Rotary axis motor is damaged this must be replaced.|Y
01|71853|2|1|OKL4-ER32X  (103505)|Y
01|71855|1|1|Qty Break 1-9|Y
01|71855|2|1|Qty Break 10-19|Y
01|71855|3|1|Qty Break 20+|Y
01|71862|2|1|Ship out when stock comes in.|Y
01|71872|1|1|Replacement for crashed unit sent in on RGA# TOR-49722|Y
01|71873|3|1|NO CABLE MANAGEMENT WORKHOLDING|Y
01|71873|3|2|SUBPLATE INCLUDED FOR WORK CLEARANCE|Y
01|71894|2|1|Stainless Steel Spindle|Y
01|71896|3|1|holds 11/64|Y
01|71896|4|1|holds 13/64|Y
01|71896|6|1|holds 21/64|Y
01|71896|11|1|holds 33/64|Y
01|71896|12|1|holds 17/32|Y
01|71897|1|1|200MM face plate with rust proff treatment.|Y
01|71897|1|2|Includes: Control box cables pendant power cable|Y
01|71897|1|3|M-code cable.|Y
01|71898|1|1|Additional discount quoted to replace damaged|Y
01|71898|1|2|SF-HEAT-RING-2-5 as a courtesy.|Y
01|71909|5|1|PRO|N
01|71937|1|1|Quoted at a net price|Y
01|71937|1|2|e|N
01|71956|1|1|NSVX-400MA DOES NOT INCLUDE MOTOR SAME AS S/N 1066|Y
01|71956|1|3|NSVX-400 faceplate has no slots|Y
01|71956|1|4|DELIVERY PENDING|Y
01|71956|3|1|tat 400 faceplate has no slots same as s/n1154|Y
01|71958|1|1|Table with Fanuc motor.|Y
01|71958|5|1|Installation Includes: Drive amps bulkhead cable sets|Y
01|71958|5|2|external cable sets communication cables parameter|Y
01|71958|5|3|changes travel and labor for installation|Y
01|71958|10|1|$ 1000.00 list price tool certificate at no charge|Y
01|71962|1|1|H63F-SF1000-3.00|Y
01|71962|1|2|HSK63F  1 Shrink Fit Holder w 3.00 G.L.|Y
01|71967|5|1|Installation includes: Bulkhead cables if required|Y
01|71967|5|2|parameter changes service time and travel|Y
01|71978|1|1|Quantity break 20-29 pieces.|Y
01|71978|3|1|Quantity break 30+ pieces|Y
01|72005|1|1|Repair of customer's CAT40-UMT200U|Y
01|72005|1|2|Reference RGA# TOR-49810|Y
01|72005|2|1|Stylus is a BALL Tip.|Y
01|72005|2|2|If customer refers the CYLINDER tip we will need to|Y
01|72005|2|3|requote.|Y
01|72032|1|1|One time price for test non-returnable|Y
01|72032|1|2|non-refundable.|Y
01|72055|1|1|BT35 27mm arbor shell mill 1.3/4 projection|Y
01|72055|1|2|P/N: B3501-27-1.75|Y
01|72066|2|1|5AX130 Cable Set|Y
01|72079|1|1|Tooling Certificate 16475-891-120916|Y
01|72094|4|1|HSK63F-SF0375-6.00|Y
01|72108|1|1|Coolant Thru Spindle capability with this holder & the|Y
01|72108|1|2|addition of A3/8-24SL Slotted Arbor Screw below.|Y
01|72108|2|1|Coolant Arbor screw to be swapped out for Coolant Thru|Y
01|72108|2|2|capabilities.|Y
01|72108|5|1|Add DIN Modification and Slotted Arbor Screw below if|Y
01|72108|5|2|customer needs Thru Flange Coolant.|Y
01|72108|6|1|Modify NC5011-0750-4.00 to be DIN Coolant capable|Y
01|72108|6|2|then add A3/8-24SL Slotted Arbor Screw.|Y
01|72119|1|1|Repair of customer's SF-START2-UNIT-200 s/n: 2j-032|Y
01|72119|1|2|Reference RGA# CUR-49811|Y
01|72131|1|1|C4-Testbar|Y
01|72144|1|1|Inspection fee for un-repairable table sent in on|Y
01|72144|1|2|RGA# TAR-49776.  5AX-151ZA s/n: 0009.|Y
01|72144|1|3|Table cannot be re-assembled too many missing parts.|Y
01|72151|1|1|Below are approximate costs|Y
01|72151|1|2|Hotel: $200/night|Y
01|72151|1|3|Transit Time: 12 hours round trip x $100/hr = $1200|Y
01|72151|1|4|Gas Milage Cost:  Approx $300 round trip|Y
01|72151|1|5|Meals: $75.00/day|Y
01|72151|2|1|Estimated time for technician is 2-4 hours.|Y
01|72151|2|2|Additional labor will be charges per hour.|Y
01|72159|5|1|Special Order. Unit Price Each.|Y
01|72162|1|1|Qty Break Pricing|Y
01|72162|2|1|Qty Break Pricing|Y
01|72184|26|1|CAT40-SF0125-3.15CP|Y
01|72184|27|1|CAT40-SF0125-6.30CP|Y
01|72184|38|1|CAT40-SF0187-3.15CP|Y
01|72187|1|1|Repair of customer's MZQT5-CT40X-OFF s/n: 5775901|Y
01|72187|1|2|Mimatic# 131538|Y
01|72187|1|3|Reference RGA# LVR-49736|Y
01|72187|2|1|Bearings seals and o-rings must be replaced.|Y
01|72190|1|1|MBT50-FMA47.625-75|Y
01|72226|9|1|if order today deliver within 2 weeks|Y
01|72229|2|1|UBH-68|Y
01|72229|2|2|Boring Bar (w/o Boring Units)|Y
01|72229|2|3|Special Order. Unit Price Each.|Y
01|72234|9|1|CAT40-SF14-80CP X 2|Y
01|72235|3|1|CONFIRMATION OF FIT TO MACHINE AND TRAVEL OF MACHINE|Y
01|72235|4|1|EXTERNAL POWER/FEEDBACK CABLE SET (2 AXIS)|Y
01|72235|21|1|INCLUDES DUAL AXIS DRIVE WIRES CONNECTORS INTERNAL|Y
01|72235|21|2|CABLES FIBRE OPTICS TRAVEL LABOR TRAINING|Y
01|72235|22|1|THIS INSTALLATION CHARGE IS LESS IF WE CAN USE THE|Y
01|72235|22|2|4TH AXIS DRIVE ALREADY IN MACHINE|Y
01|72247|1|1|Tooling Certificate Number: E13170-662-072715|Y
01|72251|24|1|This product is given in terms of NET PRICE no further|Y
01|72251|24|2|discount is to be taken from it.|Y
01|72251|25|1|This product is given in terms of NET PRICE no further|Y
01|72251|25|2|discount is to be taken from it.|Y
01|72251|27|1|This product is given in terms of NET PRICE no further|Y
01|72251|27|2|discount is to be taken from it.|Y
01|72272|5|2|DELIVERY 3-4 WEEK (OR BETTER)AIR DIRECT TO AZIMUTH|Y
01|72272|5|3|FROM FACTORYY|Y
01|72272|7|1|$ 10000.00 FACE VALUE TOOL CERT (NO CHARGE)|Y
01|72277|1|1|Quoted at Net Price|Y
01|72279|1|1|Repair of customer's HP-6|Y
01|72279|1|2|Reference RGA# TOR-49806|Y
01|72279|5|1|Must be calibrated.|Y
01|72280|1|1|Repair of customer's CAT50-UMT200U|Y
01|72280|1|2|Reference RGA# TOR-49825|Y
01|72281|3|1|5+1 Rotary Union|Y
01|72281|4|1|NSP-20-15V1A4-3031ADC-W538|Y
01|72281|4|2|6 Port Hydraulic Unit|Y
01|72281|6|1|Installation at IL (1-2 units)|Y
01|72281|6|2|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|72281|6|3|ADDITIONAL DRIVES CONNECTORS & LABOR|Y
01|72281|6|4|THIS COST DOES NOT INCLUDE ANY PARAMETERS THAT FANUC|Y
01|72281|7|1|Instllation at IL (3-4 units)|Y
01|72281|7|2|Same Condition as Above Item# 6|Y
01|72281|12|1|Installation at TN (1-2 Units)|Y
01|72281|12|2|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|72281|12|3|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|72281|12|4|THIS COST DOES NOT INCLUDE ANY PARAMETERS THAT FANUC|Y
01|72281|13|1|Installation at TN (3-4 Units)|Y
01|72281|13|2|Same Condition as Above Item# 12|Y
01|72301|1|1|This is a 4500RPM version of the tool!|Y
01|72304|7|1|Custom Positioning Block produced utilizing customer's|Y
01|72304|7|2|machine specs.|Y
01|72314|1|1|CAT40-SK10-90U-IDU-J Coolant Nut to be installed prior|Y
01|72314|1|2|to shipping from Lyndex-Nikken. Price includes Coolant|Y
01|72314|1|3|Nuts and install.|Y
01|72314|2|1|Nuts to be installed at Lyndex-Nikken prior to shipping|Y
01|72314|2|2|and holder price includes the nut swap.|Y
01|72320|2|1|Installed on NC5-63-AHK10-160-55|Y
01|72333|2|1|Price reflects Net Charge for in house DIN modification|Y
01|72333|3|1|Price reflects Net Charge for in house DIN modification|Y
01|72338|2|1|Wrench provided complimentary to customer|Y
01|72338|3|1|Custom Positioning Block by Lyndex-Nikken based on info|Y
01|72338|3|2|from end user to Tim Reeves|Y
01|72346|1|2|37pcs 8-10weeks mfg + shipping|Y
01|72346|3|1|BT50-FMD25.4-50.8|Y
01|72370|1|1|Due to damage on ID bore of unit sent in on|Y
01|72370|1|2|RGA# TOR-49841 we recommend purchasing a replacement.|Y
01|72370|1|3|Additional discount quoted as a courtesy.|Y
01|72373|1|1|Customer has opted to purchase replacements.|Y
01|72373|1|2|Inspection fees have been waived.|Y
01|72373|1|3|Reference RGA# TOR-49794|Y
01|72373|2|1|Customer has requested us to return the 2 PF-2|Y
01|72373|2|2|originally sent in for evaluation.  These will be|Y
01|72373|2|3|returned disassembled.|Y
01|72382|7|1|Includes: Installation of Bulkhead Cable set external|Y
01|72382|7|2|cable set wireharness parameter changes service time|Y
01|72382|7|3|and travel.|Y
01|72400|2|1|Offered at a higher discount as a stock replacement for|Y
01|72400|2|2|C4006-0125-2.36.|Y
01|72407|6|1|Lyndex-Nikken to make position block obtain receipt|Y
01|72407|6|2|of machine spindle information.|Y
01|72407|6|3|*net price|Y
01|72408|4|1|7pcs Stock & 14pcs 2 wks balance = pending|Y
01|72409|1|1|Live Tool for Fuji CSD300R Item# 190853 ER25 IC|Y
01|72409|1|2|Special Order. Unit Price Each.|Y
01|72409|2|1|Live Tool for Fuji CSD300R Item# 190853 ER25 IC|Y
01|72409|2|2|Special Order. Unit Price Each.|Y
01|72409|3|1|Live Tool for Fuji CSD300R Item# 190853 ER25 IC|Y
01|72409|3|2|Special Order. Unit Price Each.|Y
01|72409|5|1|Live Tool for Fuji CSD300R Item# 102771|Y
01|72409|5|2|Special Order. Unit Price Each.|Y
01|72409|6|1|Live Tool for Fuji CSD300R Item# 102771|Y
01|72409|6|2|Special Order. Unit Price Each.|Y
01|72409|7|1|Live Tool for Fuji CSD300R Item# 102771|Y
01|72409|7|2|Special Order. Unit Price Each.|Y
01|72409|9|1|Spanner Wrench ER25 40/42mm Mimatic Item# 107558|Y
01|72409|9|2|Special Order. Unit Price Each.|Y
01|72410|1|1|Repair of customer's C40RAM-ER32-180 s/n: 31400 02|Y
01|72410|1|2|Reference RGA# CUR-49796|Y
01|72410|2|1|Bevel Gears and ER32 spindle are damaged these must|Y
01|72410|2|2|be replaced.|Y
01|72410|2|3|Bearings seals and o-rings must be replaced.|Y
01|72411|1|1|18000 RPM|Y
01|72434|2|1|PRO|Y
01|72440|2|1|Includes:  Drive unit short bar fiber optics cable|Y
01|72440|2|2|communication cable bulkhead cable external cables|Y
01|72440|2|3|parameter change Service time and travel|Y
01|72469|2|1|*Possible substitution for C4006-0125-2.36|Y
01|72473|2|1|*Possible substitution for C4006-0125-2.36|Y
01|72481|1|1|Quote based upon Key Slot 72mm (2.835)|Y
01|72481|1|2|Standard spacers included.|Y
01|72481|1|3|Quoted at Net price|Y
01|72481|2|1|Quote based upon Key Slot 72mm (2.835)|Y
01|72481|2|2|Standard spacers included.|Y
01|72481|2|3|Quoted at Net price|Y
01|72496|1|1|Start2 Shrink fit unit + 10 std GL HSK63A SF holders|Y
01|72496|2|1|Fi-5b Shrink fit unit + 10 std GL HSK63A SF holders|Y
01|72498|3|1|Net Price|Y
01|72498|3|2|Lyndex-Nikken can make the position block upon receipt|Y
01|72498|3|3|of machine spindle information|Y
01|72523|1|1|Tooling Certificate #13705TA-925-022217RT|Y
01|72528|1|1|No Motor.|Y
01|72534|1|1|Repeat tooling for a special.|Y
01|72534|1|2|Once a PO has been issued it cannot be cancelled or|Y
01|72534|1|3|returned.|Y
01|72534|6|1|Erickson calls out 100mm (3.93) gl|Y
01|72534|6|2|Lyndex-Nikken offers 101.60mm (4) gl|Y
01|72534|21|1|*Length 6.30|Y
01|72534|23|1|Command uses 7 Gl|Y
01|72534|24|1|Command uses 7 Gl|Y
01|72536|1|1|Quoted as NET pricing|Y
01|72536|7|1|Quoted as NET pricing|Y
01|72536|9|1|Quoted as NET pricing|Y
01|72536|11|1|This item quoted as NET pricing|Y
01|72536|12|1|This item quoted as NET pricing|Y
01|72536|13|1|This item quoted as NET pricing|Y
01|72536|14|1|This item quoted as NET pricing|Y
01|72536|15|1|This item quoted as NET pricing|Y
01|72536|16|1|This item quoted as NET pricing|Y
01|72536|17|1|This item quoted as NET pricing|Y
01|72540|7|1|ETA aprox 7-8 weeks|Y
01|72546|8|1|*Retention Knob Promo|Y
01|72546|8|2|Special pricing $5ea - Qty to match BT30 holders|Y
01|72549|1|1|Repair of customer's T32386 s/n: A0032|Y
01|72549|1|2|Reference RGA# LVR-49829|Y
01|72549|2|1|Drive shaft is damaged this must be replaced.|Y
01|72549|2|2|Collet nuts bearings seals and o-rings must also|Y
01|72549|2|3|be replaced.  Labor is included.|Y
01|72553|3|1|Above item reflects NET charge|Y
01|72561|1|1|Service call completed by Kyle on 4/17/17|Y
01|72561|1|2|5AX-201YA-M s/n: 5340|Y
01|72561|2|1|Transit Time: 1.08 hour x $100/hr = $108.00|Y
01|72561|2|2|Gas Per Mileage: 38 mi(round trip) x .565 = $21.47|Y
01|72561|2|3|Meal: $15.00|Y
01|72561|4|1|4.17 hours of labor x $135.00/hr = $562.95|Y
01|72576|1|1|CAT40 40mm End Mill Holder Standard Gauge Length|Y
01|72591|1|1|Reference RGA# TAR-49816|Y
01|72591|1|2|5AX-300 s/n: 5258|N
01|72608|1|1|No longer standard stock length. Considered a special.|Y
01|72608|1|2|Once a PO has been issued it cannot be cancelled or|Y
01|72608|1|3|returned.|Y
01|72616|1|1|Purchase of tool holder for a test.|Y
01|72616|1|2|This cannot be cancelled or returned.|Y
01|72623|1|1|Mazak QTN350 Special 45 Deg Fixed Angle Tool|Y
01|72623|1|2|ER32 Output IntC and Ext Coolant|Y
01|72623|2|1|Mazak QTN350 Special 45 Deg Fixed Angle Tool|Y
01|72623|2|2|ER32 Output IntC and Ext Coolant|Y
01|72624|1|1|Reference RGA# TAR-49845|Y
01|72624|1|2|CNCZ180LSA-BR s/n: 12236|N
01|72625|6|1|Command P/N HSK100A H6YA0500|Y
01|72625|6|2|Command uses 7 GL|Y
01|72625|7|1|Quoted as NET pricing|Y
01|72625|7|2|Non-Cancelable Non-Returnable|Y
01|72625|9|1|Quoted as NET pricing|Y
01|72625|9|2|Non-Cancelable Non-Returnable|Y
01|72625|11|1|This item quoted as NET pricing|Y
01|72625|11|2|Non-Cancelable Non-Returnable|Y
01|72625|12|1|This item quoted as NET pricing|Y
01|72625|12|2|Non-Cancelable Non-Returnable|Y
01|72625|13|1|This item quoted as NET pricing|Y
01|72625|13|2|Non-Cancelable Non-Returnable|Y
01|72625|14|1|This item quoted as NET pricing|Y
01|72625|14|2|Non-Cancelable Non-Returnable|Y
01|72625|15|1|This item quoted as NET pricing|Y
01|72625|15|2|Non-Cancelable Non-Returnable|Y
01|72625|16|1|This item quoted as NET pricing|Y
01|72625|16|2|Non-Cancelable Non-Returnable|Y
01|72625|17|1|This item quoted as NET pricing|Y
01|72625|17|2|Non-Cancelable Non-Returnable|Y
01|72625|18|1|ID Chip-BALLUFF|Y
01|72625|18|2|ID chips installed on holders at factory|Y
01|72625|18|3|Non-returnable Non-cancellable|Y
01|72625|19|1|Coolant Tubes installed  holders at factory|Y
01|72625|19|2|Non-returnable Non-cancelable|Y
01|72625|20|1|Command P/N HSK100A H6Y5A0625|Y
01|72625|20|2|Command uses 7 GL|Y
01|72625|21|1|Command P/N HSK100A H6Y5A1000|Y
01|72625|21|2|Command uses 7 GL|Y
01|72625|22|1|Command P/N HSK100A ER32484|Y
01|72660|3|1|Lyndex-Nikken can make the block upon receipt of|Y
01|72660|3|2|spindle drawing information|Y
01|72660|3|3|Delivery about 1 week from confirmation|Y
01|72660|4|1|Bushing is required to purchase.|Y
01|72660|4|2|Does not matter if the customer is making the block or|Y
01|72660|4|3|if Lyndex-Nikken is making the block. This is needed.|Y
01|72678|3|1|Will fit and replace the stylus for the PF-1 and the|Y
01|72678|3|2|PF-2|Y
01|72681|1|1|C5006-1000A-6.00 CAT50 1 ID Aerospace EMH - 6 GL|Y
01|72683|1|1|Included Shipping Cost & Labor|Y
01|72685|1|1|Locating pin for MZQT5-ER40X-OFF-ICE|Y
01|72690|1|1|Tooling Certificate Number: 25000-897-121916RT|Y
01|72717|1|1|This one has a 20mm Shank.|Y
01|72717|2|1|This one has a 3/4 Shank.|Y
01|72717|3|1|This one has a 3/4 Shank.|Y
01|72717|4|1|This one has a 20mm Shank.|Y
01|72740|1|1|105MM single spindle table for Brother S700X1|Y
01|72740|2|1|105MM twin spindle table with 120MM pitch.|Y
01|72740|2|2|One table only with junction box wiring for second unit|Y
01|72740|2|3|for the Brother R650X1.|Y
01|72747|1|1|Reference RGA# TAR-49813|Y
01|72747|1|2|5AX-2002FA-M s/n: 1524|N
01|72748|1|1|Only 1pc left in stock and being discontinued.|Y
01|72748|2|1|Only 8pcs left in stock and being discontinued.|Y
01|72748|3|1|Only 7pcs left in stock and being discontinued.|Y
01|72768|1|1|260MM Rotary table with Haas Sigma 5 motor and cables|Y
01|72769|1|1|For Honda OH CNC400HMA-APC-2|N
01|72779|3|1|*** Promotion Price ****|Y
01|72779|5|1|*** Promotion Price ***|Y
01|72796|3|1|External Cables for 5AX-130FA-M - Tilt and Rotary|Y
01|72796|4|1|STEEL BRAIDED CABLE SET. 99% OF OUR CABLES ARE NOT|Y
01|72796|4|2|STEEL BRAIDED.|Y
01|72809|2|1|Installation includes:Drive unit short bar|Y
01|72809|2|2|fiber optic  cable communications cable|Y
01|72809|2|3|external cables bulkhead cables parameter changes|Y
01|72809|2|4|service time and travel.|Y
01|72816|3|1|Price reflects Net Charge for in house DIN modification|Y
01|72836|5|2|DELIVERY 3-4 WEEK (OR BETTER)AIR DIRECT TO AZIMUTH|Y
01|72836|5|3|FROM FACTORYY|Y
01|72836|7|1|$ 10000.00 FACE VALUE TOOL CERT (NO CHARGE)|Y
01|72855|1|1|This is give in terms of NET Price!!|Y
01|72860|1|1|NET PRICE EACH|Y
01|72884|3|1|Interface of 2 machines. CNC321F-M will be moved back|Y
01|72884|3|2|and forth at user's discretion.|Y
01|72884|3|3|Includes:  1 set External Cables|Y
01|72884|3|4|2x Drive Units 2x Short Bar 2x Fiber Optic Cable|Y
01|72884|3|5|2x Communication Cable 2x Bulkhead Cable|Y
01|72884|3|6|*Interface of both machines will be on the same visit|Y
01|72884|3|7|of Lyndex-Nikken Installer|Y
01|72894|1|1|7 pcs 1-2 WKS 3 pcs 7-8 WKS|Y
01|72894|2|1|6 pcs 1-2 WKS 4pcs 7-8 WKS|Y
01|72894|3|1|9 STK 8 WKS FOR BALANCE GL=90mm|Y
01|72894|4|1|1 STK 8 WKS FOR BALANCE GL=120mm|Y
01|72896|5|1|For Okuma LB3000EX2M|Y
01|72911|1|1|net price|Y
01|72911|6|1|wrench sold separate for milling chuck|Y
01|72928|1|1|3 Prong Wrench|Y
01|72933|2|1|200MM five axis table with SABR motors and cables|Y
01|72933|2|2|for a TCS2D.|Y
01|72934|19|1|This tool is given in terms of NET price.|Y
01|72935|3|1|H63A-SF38-135 HSK63A 38mm Shrink Fit Holder|Y
01|72951|1|1|KM12-1/8|Y
01|72952|2|1|Discount based on 2pcs purchased at same time.|Y
01|72963|2|1|7/16 collet B/O ETA 5/15|Y
01|72963|4|1|100-060(C) B/O ETA PENDING|Y
01|72972|1|1|conversion of 5AX-2MT-105-120SABR to SABR2 for R650|Y
01|72972|1|2|Inlcudes: Two motors wire harness external cables|Y
01|72972|1|3|drive units and service time and travel.|Y
01|72974|1|1|HSK100A-1.9995- 6.00 gage length as per drawing|Y
01|72976|2|1|Quoted as Net Price|Y
01|72976|4|1|C4006-0125-2.50B|Y
01|72992|1|1|200MM table CASTING AND MOTOR COVER ONLY|Y
01|72992|1|2|EMS RESPONSIBLE TO MOUNT EXISTING MOTOR CABLE HARNESS|Y
01|72992|1|3|AND CONNECTORS|Y
01|72992|3|1|200MM TABLE ONLY. EMS RESPONSIBLE TO MOUNT EXISTING|Y
01|72992|3|2|MOTOR CABLE HARNESS AND CONNECTORS|Y
01|72995|7|1|Delivery 2 Weeks|Y
01|72999|1|1|1pc stock remaining balance ETA Aprox 4/26/2017|Y
01|73029|1|1|Repair of customer's OKL3-ER32Z-OFMS s/n: AL193|Y
01|73029|1|2|Reference RGA# LVR-49868|Y
01|73029|2|1|Collet nuts bearings seals and o-rings must be|Y
01|73029|2|2|replaced. Labor is included.|Y
01|73029|3|1|Repair of customer's OKL3-ER32X s/n: AL1186|Y
01|73029|4|1|Collet nut bearings seals and o-rings must be|Y
01|73029|4|2|replaced.  Labor is included.|Y
01|73031|1|1|Note: 440V available|Y
01|73031|1|2|CAT40 Package includes 2 locator ring and cooling|Y
01|73031|1|3|tower.|Y
01|73031|2|1|*** Special Price - Demo Unit ***|Y
01|73031|2|2|CAT40 Package includes 2 locator ring and cooling|Y
01|73031|2|3|tower.|Y
01|73031|8|1|Backorder to Nikken 196 pcs of CAT40-SK16-120U in|Y
01|73031|8|2|stock.|Y
01|73046|1|1|Table with A06B-0075-B003 x 2 Beta 8iS Motors|Y
01|73046|2|1|External Cable Set (Power/Signal & Feedback)|Y
01|73046|2|2|Item is per Axis|Y
01|73046|2|3|Customer to specify length|Y
01|73046|3|1|Interface Cable Set (Power/Signal & Feedback)|Y
01|73046|3|2|Price is per Axis|Y
01|73046|3|3|Customer to specify length|Y
01|73046|7|1|Air Purge System|Y
01|73046|7|2|Item is per Axis|Y
01|73046|9|1|Air Freight Charge to from L/N USA to Republic Lagun|Y
01|73046|9|2|This is approximate estimate|Y
01|73057|6|1|Unit Price Each.|Y
01|73069|1|1|Master Jaws for H037M8 Z-187|Y
01|73069|1|2|PC-MJAW-08-HS-1.5S|Y
01|73069|1|3|1 Set = 3 pcs|Y
01|73079|1|1|Tooling Certificate Number: 13170-919-020217|Y
01|73083|1|1|RMSS-8.0 Reamer|Y
01|73090|1|1|Tooling Certificate Number: 5410-931-031017|Y
01|73092|1|1|All pieces to build set in stock except 100-060(C)|Y
01|73092|2|1|All pieces to build set in stock except 100-060(C)|Y
01|73092|3|1|All pieces to build set in stock except 100-043(C)|Y
01|73092|3|2|and 100-060(C).|Y
01|73103|2|1|$100.00net per holder|Y
01|73103|2|2|Modification Clearance for ATC|Y
01|73104|1|1|With Haas motor and cable set.|Y
01|73104|2|1|With Haas motor and cable set.|Y
01|73117|6|1|To sleeve down for the respective sizes smallest CAT50|Y
01|73117|6|2|Hydraulic Chuck is .375 nose ID.|Y
01|73124|8|1|Backorder to Nikken 196 pcs of CAT40-SK16-120U in|Y
01|73124|8|2|stock.|Y
01|73143|1|1|Reference RGA# TAR-49514|Y
01|73143|1|2|5AX-130ZA s/n: 1128|Y
01|73143|45|1|Spindle is damaged must be plated and re-ground.|Y
01|73154|1|1|ETA on 2nd pc is pending.|Y
01|73154|2|1|ETA on 2nd pc is pending.|Y
01|73162|1|1|SPECIAL PRICING PER DISCUSSION|Y
01|73172|5|1|GH10 wrench does not work on the K1.1/4-SK10-210 holder|Y
01|73185|1|1|Repair of customer's MNL12-ER32Z-MS s/n: A1915|Y
01|73185|1|2|Reference RGA# LVR-49887|Y
01|73185|2|1|Collet nuts bearings seals & o-rings must be|Y
01|73185|2|2|replaced.  Labor is included.|Y
01|73190|5|1|GH10 wrench does not work on the K1.1/4-SK10-210 holder|Y
01|73209|2|1|VMK16-5/8 Coolant Thru Collet|Y
01|73217|5|1|FULL 4TH AXIS INSTALLATION RO HARDING GX1600 W/FANUC|Y
01|73217|5|2|INCLUDES DRIVE FRIBRE OPTICS CONNECTORS LABOR|Y
01|73217|5|3|TRAVEL|Y
01|73225|1|1|Includes motors|Y
01|73225|1|2|Control Data Sheets required at time of PO for|Y
01|73225|1|3|cable connections.|Y
01|73225|1|4|Left hand model available for $300 extra|Y
01|73225|2|1|Includes cables servoamps and 1/2 day technican|Y
01|73225|2|2|Ladder for 4th axis must be pesent prior to|Y
01|73225|2|3|installation.|Y
01|73225|2|4|Installation is quoted at net price|Y
01|73258|4|1|Custom Positioning Block produced by Lyndex-Nikken|Y
01|73258|4|2|based on specs provided by End User|Y
01|73263|2|1|CAT50-Q42-275A|Y
01|73263|3|1|CAT50-Q42-225A|Y
01|73263|4|1|SP42-20-60|Y
01|73263|5|1|SP42-26-60|Y
01|73263|6|1|SP42-34-60|Y
01|73263|8|1|new part# 20-ZMAC42-70V|Y
01|73263|9|1|new part# 26-ZMAC55-70V|Y
01|73263|10|1|new part# 34-ZMAC70-85V|Y
01|73276|1|1|HSK63C-ER32-60|Y
01|73309|1|1|M7-62|Y
01|73309|1|2|BCB Srew on type unit|Y
01|73309|1|3|CAT50-BCB62-330U|Y
01|73309|2|1|10MP-E|Y
01|73309|2|2|Insert for alloy steel|Y
01|73309|2|3|CAT50-BCB62-330U|Y
01|73314|1|1|CAT50-AF1-30-OH - Back Spot Facing arbor/Main Body|Y
01|73314|2|1|BF130-18-35-35C - Arbor|Y
01|73314|3|1|9BF-130-18-35-35C-W - Byte (MINIMUM ORDER OF 5 REQ|Y
01|73317|4|1|C5037-0020-8.00 DIN modified|Y
01|73326|1|1|Repair of customer's ZERO-SET4|Y
01|73326|1|2|Reference RGA# TOR-49893|Y
01|73327|1|1|Net price reflects E16-Nut-Hex installed on holder.|Y
01|73327|1|2|Once modified tool is non-returnable.|Y
01|73332|3|1|*** Promotion Price ****|Y
01|73332|5|1|*** Promotion Price ***|Y
01|73337|1|1|Repair of customer's N4005-0562-3.90|Y
01|73337|1|2|Reference RGA# TOR-49914|Y
01|73338|1|1|installed w/ PS-N46E pull stud|Y
01|73338|2|1|installed on NC5 holder at factory|Y
01|73338|4|1|installed w/ PS-N46E pull stud|Y
01|73338|5|1|installed on NC5 holder at factory|Y
01|73338|7|1|installed w/ PS-N46E pull stud|Y
01|73338|9|1|installed on NC5 holder at factory|Y
01|73341|8|1|Promo-1 free holder|Y
01|73344|4|1|5-AXIS NIKKEN ROTARY TABLE WITH MOTOR|Y
01|73349|1|1|Tooling Certificate Number: 13170-919-020217|Y
01|73359|1|1|Net price reflects hot deals!|Y
01|73363|1|1|Hiro entered line comment here. to be shown to customer|Y
01|73363|1|2|2nd line is for office use only|N
01|73365|1|1|Repair of PF-2 #1|Y
01|73365|1|2|Reference RGA# TOR-49905|Y
01|73365|6|1|Repair of PF-2 #2|Y
01|73365|6|2|Reference RGA# TOR-49905|Y
01|73366|3|1|Quote as Net Price|Y
01|73366|8|1|Special one time discount|Y
01|73394|1|1|Qty Break 1-10pcs|Y
01|73394|2|1|Qty Break 11-19pcs|Y
01|73394|3|1|Qty Break 20+pcs|Y
01|73394|5|1|Qty Break 1-10pcs|Y
01|73394|6|1|Qty Break 11-19pcs|Y
01|73394|7|1|Qty Break 20+pcs|Y
01|73424|1|1|Touch Probe Sensor Stylus CAT40 Taper Receiver|Y
01|73424|1|2|Cables Master Gauge Manual and hardware|Y
01|73424|2|1|Tool Setter Probe Hard Wire Cable Manual and Hardware|Y
01|73424|3|1|Master Gauge for Tool Setter - Item #2|Y
01|73425|1|1|Repair of customer's MZQT47-ER32Z-MS s/n: 59377 08|Y
01|73425|1|2|Reference RGA# LVR-49866|Y
01|73425|2|1|ER spindle assembly bearings seals & o-rings must|Y
01|73425|2|2|be replaced. Labor is included.|Y
01|73433|2|1|Net price quoted.|Y
01|73433|2|2|Non-Retunrable|Y
01|73435|4|1|Lyndex-Nikken would accept a blanket order with the|Y
01|73435|4|2|items to be purchased in an agreed apon time frame.|Y
01|73473|3|1|EXTERNAL CABLE SET|Y
01|73473|5|1|INSTALLATION INCLUDES DRIVE CONNECTORS FIBRE OPTICS|Y
01|73473|5|2|INTERNAL CONNECTORS CABLE MANAGEMENT TRAVEL& LABOR|Y
01|73484|1|1|With MT3 center|Y
01|73485|3|1|Installation inlcudes: Dual axis drive unit short bars|Y
01|73485|3|2|fiber optic cables communications cables bulkhead|Y
01|73485|3|3|cables external cables parameter changes service|Y
01|73485|3|4|time and travel.|Y
01|73489|3|1|NBT30-SK10C-105|Y
01|73489|3|2|2Lock TaperPlus NBT30 SK10 Slim Chuck Coolant|Y
01|73490|1|1|Non-returnable Non-cancelable|Y
01|73490|1|2|Quoted as NET pricing|Y
01|73497|1|1|NC5-100-SK16C-105 w/ PS-N100VE installed|Y
01|73498|4|1|According Hemaq Engineering department this Rotary|Y
01|73498|4|2|Table will be set Direct Mount External Cables.|Y
01|73504|1|1|Left Handed Unit. Includes servo motor.|Y
01|73504|1|2|Air or Hyd Brake-Hyd Brake requires auxiliary unit|Y
01|73504|2|1|* Optional Equipment - Recommended for Trunnions *|Y
01|73504|2|2|End Support with Brake - Air or Hyd|Y
01|73504|3|1|Install price to install 1 table. Includes cables|Y
01|73504|3|2|servo amps all parts and technican.|Y
01|73504|3|3|Price Listed is Net Price|Y
01|73504|4|1|Install price to install 2 tables. Includes cables|Y
01|73504|4|2|servo amps all parts and technican.|Y
01|73504|4|3|Price Listed is Net|Y
01|73505|1|1|>>>SPECIAL PRICE<<< FOR SHOW ROOM MACHINE AND HOLDERS|Y
01|73512|1|1|NC4011-0750-4.00 w/ Jet Slot Coolant Arbor Screw|Y
01|73512|1|2|A3/8-24SL installed prior to shipping.|Y
01|73512|1|3|Price includes A3/8-24SL Slotted Arbor Screw.|Y
01|73533|4|1|*NET Price|Y
01|73547|6|1|Free holder if all tooling is purchased on quote.|Y
01|73547|12|1|Retention Knob Promo|Y
01|73600|3|1|Includes all parts and 1/2 onsite technician|Y
01|73600|3|2|Install price (2) tables $7500 net|Y
01|73600|3|3|Install price (3) tables $7000 net|Y
01|73600|3|4|Quantity Break Install Price good for Same Day|Y
01|73603|1|1|Nikken Face Mill NBT50-FMH25.4-70-250|Y
01|73603|2|1|Nikken Face Mill NBT50-FMH25.4-70-300|Y
01|73603|3|1|Nikken Face Mill Holder NBT50-FMH31.75-76-250|Y
01|73603|4|1|Nikken Face Mill NBT50-FMH31.75-76-300|Y
01|73603|5|1|Nikken Face Mill NBT50-FMH38.1-100-250|Y
01|73603|6|1|Nikken Face Mill  NBT50-FMH38.1-100-300|Y
01|73607|23|1|*wrench sold separate|Y
01|73607|24|1|*wrench sold separate|Y
01|73607|25|1|*wrench sold separate|Y
01|73607|26|1|*coolant tubes sold separate|Y
01|73608|5|1|hold 0.191|Y
01|73608|7|1|hold 0.315|Y
01|73608|8|1|hold 0.4688    (15/32 on b/o)|Y
01|73608|12|1|hold 0.5156|Y
01|73608|14|1|hold 14mm|Y
01|73608|16|1|hold 0.5625|Y
01|73608|21|1|hold 1|Y
01|73608|25|1|hold 0.875|Y
01|73608|28|1|hold 0.098|Y
01|73608|29|1|hold 3mm|Y
01|73608|33|1|hold 6mm|Y
01|73644|1|1|NCAT40 Special 40mm Feedmill per drawing|Y
01|73662|1|1|C5036-0500-8.00DIN|Y
01|73662|2|1|C5037-0025-8.00DIN|Y
01|73676|3|1|to be Coolant Port modified|Y
01|73676|4|1|C5016-0437-4.00 modified to Coolant Port capable|Y
01|73698|3|1|C5016-1000A-6.00|Y
01|73698|6|1|C5026-1250A-8.00|Y
01|73698|8|1|C5006-1500A-4.50|Y
01|73698|9|1|C5016-1500A-7.00|Y
01|73709|1|1|5AX-1250-1550BFA-M|Y
01|73709|1|2|Special Order. Unit Price Each.(Price JPY)|Y
01|73709|1|3|Nikken 1250 x 1550mm 5th axis|Y
01|73709|1|4|Requires Weight Capacity: 2500kg|Y
01|73709|1|5|Upon reciept of P/O.|Y
01|73709|1|6|Delivery Point : Kuraki Japan Factory|Y
01|73712|1|1|NET PRICE >>>SPECIAL<<< APLIED ONLY IF BUY 4 SETS|Y
01|73712|2|1|NET PRICE >>>SPECIAL<<< APLIED ONLY IF BUY 4 SETS|Y
01|73712|3|1|NET PRICE >>>SPECIAL<<< APLIED ONLY IF BUY 4 SETS|Y
01|73712|4|2|NET PRICE >>>SPECIAL<<< APLIED ONLY IF BUY 4 SETS|Y
01|73727|3|1|Machine#7: Hyundia-Kia VX380TD Serial# G3691-80-510|Y
01|73727|3|2|*** Important *** Ladder Logic to drive 2 additonal|Y
01|73727|3|3|axis must be present prior to install.|Y
01|73727|3|4|Installation includes all parts and 1/2 day onsite|Y
01|73727|3|5|technician.|Y
01|73727|3|6|Price is Net|Y
01|73727|5|1|Programmically controlled by M-Code|Y
01|73727|5|2|Positional Index Only via M-Code|Y
01|73727|7|1|Machine#8: Hyundia-Kia VX380TD Serial#VX380TD0265|Y
01|73727|7|2|Cable and M-Code install 1/2 day onsite technician|Y
01|73727|7|3|Price is Net|Y
01|73731|1|1|Repair of PF-2 #1 Version 1.|Y
01|73731|1|2|Reference RGA# TOR-49948|Y
01|73731|4|1|Inspection fee for unrepairable unit customer does|Y
01|73731|4|2|not want to replace.|Y
01|73731|4|3|Unit will be scrapped per Kathi's instruction.|Y
01|73732|1|1|Original unit sent in on RGA# TOR-49946 has a collapsed|Y
01|73732|1|2|bore this is un-repairable.|Y
01|73733|1|1|Repair of customer's BT50-NPU13-190|Y
01|73733|1|2|Reference RGA# TOR-49954|Y
01|73739|1|1|To be DIN hole burned for flange coolant|Y
01|73739|1|2|DIN modification built into price of holders|Y
01|73756|2|1|Custom Positioning Block per specs provided by End User|Y
01|73756|2|2|to Lyndex-Nikken Engineering. for Mazak VCN700E|Y
01|73787|1|1|Reference RGA# TAR-49865|Y
01|73787|1|2|5AX-130ZA s/n: 1785|Y
01|73790|1|1|Old Part Number OK101-14000|Y
01|73790|4|1|Old Part Number OK101-72000|Y
01|73799|1|1|HFO Tampa to supply correct motors|Y
01|73799|1|2|HFO Tampa to supply cables|Y
01|73799|1|3|SPECIAL DEMO DAY PRICING|Y
01|73801|2|1|Checking Stock Status.|Y
01|73801|8|1|$ 1000 tool LYNDEX NIKKEN TOOL CERTIFICATE (LIST PRICE|Y
01|73805|7|1|w/ PS-N46E|Y
01|73805|8|1|w/ PS-123E|Y
01|73805|10|1|w/ PS-N46E|Y
01|73805|11|1|w/ PS-N46E|Y
01|73805|12|1|w/ PS-N46E|Y
01|73805|13|1|w/ PS-N46E|Y
01|73805|14|1|w/ PS-N46E|Y
01|73813|1|1|MNL0234425 Special Live Tool|Y
01|73826|1|1|131538|Y
01|73826|2|1|131591|Y
01|73828|1|1|Repair of customer's CNC201 s/n: 1463|N
01|73828|1|2|Reference RGA# TAR-49899|Y
01|73844|11|1|optional item for CAT50-SF0500-3.94CP|Y
01|73863|1|1|Non-REturnable Non-Cancelable|Y
01|73863|2|1|Non-Returnable Non-Cancelable|Y
01|73874|1|1|Table price and availability subject to change|Y
01|73874|1|2|depending on motor and drive unit availability from|Y
01|73874|1|3|Yaskawa|Y
01|73874|2|1|Installation price and availability subject to change|Y
01|73874|2|2|depending on motor and drive unit availability from|Y
01|73874|2|3|Yaskawa|Y
01|73882|1|1|Repair of customer's C5005-0875-5.66|Y
01|73882|1|2|Reference RGA# TOR-49912|Y
01|73882|3|1|Total: $241.63 Net|Y
01|73889|6|1|Wrench at no charge|Y
01|73899|1|1|>>>Special Discount<<< due to Core Buy-Back Program|Y
01|73899|1|2|You must return your clunker to receive this benefit.|Y
01|73899|2|1|>>>Special Discount<<< due to Core Buy-Back Program|Y
01|73899|2|2|You must return your clunker to receive this benefit.|Y
01|73902|1|1|Includes M-Code Cable|Y
01|73902|3|1|Includes M-Code Cable|Y
01|73920|2|1|Non-Stock Delivery Pending|Y
01|73929|10|1|optional part that closest to 8in|Y
01|73929|15|1|optional part closest to 160mm|Y
01|73945|3|1|ETA 1 WEEK|Y
01|73948|1|1|ETA 5/31|Y
01|73948|3|1|ETA 1 WEEK|Y
01|73968|1|1|Qty Break 1-2pc|Y
01|73968|2|1|Qty Break 1-2pc|Y
01|73968|7|1|Qty Break 1-2pc|Y
01|73968|8|1|Qty Break 1-2pc|Y
01|73985|28|1|Consignment tool|Y
01|73985|29|1|Consignment tool|Y
01|73985|30|1|Consignment tool|Y
01|73985|31|1|Consignment tool|Y
01|74004|1|1|200mm TR with motors and external cables|Y
01|74004|2|1|See below|Y
01|74010|1|1|S20T-ECH10S-45  S20T ER16 Holder with Hex Nut|Y
01|74010|2|1|S20T-ECH10S-45  S20T ER16 Holder with High Speed Nut|Y
01|74010|4|1|S20T-ECH10S-60  S20T ER16 Holder with Hex Nut|Y
01|74010|5|1|S20T-ECH10S-60  S20T ER16 Holder with High Speed Nut|Y
01|74010|7|1|S20T-ECH13M-45  S20T ER20 Holder|Y
01|74010|9|1|S20T-ECH13S-45  S20T ER20 Holder|Y
01|74010|10|1|S20T-ECH13S-45  S20T ER20 Holder with High Speed Nut|Y
01|74010|12|1|S20T-ECH13S-60  S20T ER20 Holder with Hex Nut|Y
01|74010|13|1|S20T-ECH13S-60  S20T ER20 Holder with High Speed Nut|Y
01|74010|15|1|S20T-ECH7S-40  S20T ER11 Holder with Hex Nut|Y
01|74010|16|1|S20T-ECH7S-40  S20T ER11 Holder with High Speed Nut|Y
01|74010|18|1|S20T-ECH7S-50  S20T ER11 Holder|Y
01|74014|1|1|Core Trade-In Discount Reference RGA# LVR-49987|Y
01|74017|1|1|Rotary Table with Right Hand Mounting|Y
01|74017|1|2|Okuma Set including table and cables.|Y
01|74018|1|1|Howa#: H3KB6 A6-J Adapter|Y
01|74018|1|2|Net price reflects FOB Japan direct to customer.|Y
01|74018|2|1|Howa#: H3KB6 A6-J Adapter|Y
01|74018|2|2|Net price reflects FOB to Lyndex-Nikken Mundelein IL|Y
01|74018|2|3|Customer responsible for freight from Mundelein Il.|Y
01|74018|3|1|ADAPTER ISO-A6 TYPE FF-3 D140.|Y
01|74018|3|2|Used when the spindle nose is bigger than the standard|Y
01|74018|3|3|one on the chuck. The adapter is mounted on to the|Y
01|74018|3|4|spindle prior to the chuck.|Y
01|74022|4|1|*wrench for ER32 collet chucks sold separate|Y
01|74025|1|1|EXTERNAL COOLANT|Y
01|74025|2|1|INTERNAL COOLANT OR 24/7 DRY RUN CAPABLE|Y
01|74025|8|1|INTERNAL COOLANT OR 24/7 DRY RUN CAPABLE|Y
01|74035|5|1|This is an alternative Torque Control version for above|Y
01|74035|8|1|This is an alternative Torque Control version for above|Y
01|74035|11|1|This is an alternative Torque Control version for above|Y
01|74035|19|1|This is an alternative Torque Control version for above|Y
01|74039|1|1|Howa C1TA115H-491 Drawbar Actuators|Y
01|74039|1|2|Net price reflects direct shipment from Japan to|Y
01|74039|1|3|end user.|Y
01|74039|2|1|Howa C1TA115H-491 Drawbar Actuators|Y
01|74039|2|2|Net price reflects FOB to Mundelein Il customer|Y
01|74039|2|3|responsible for freight from Mundelein IL.|Y
01|74063|1|1|C4007-0500-1.00|Y
01|74063|1|2|NO QUOTE|Y
01|74064|1|1|>>>Special Discount<<< Buy-Back Program for ABT|Y
01|74064|1|2|EU Must return clunker to receive this benefit|Y
01|74064|2|1|>>>Special Discount<<< Buy-Back Program for ABT|Y
01|74064|2|2|EU must return clunker to receive this benefit|Y
01|74068|1|1|ETA aprox 1 week upon reciept of motor and wire harness|Y
01|74068|1|2|10 tilt/rot. table w/o motors with brakes (hyd.)|Y
01|74072|2|1|Price on above item reflects NET DIN modification chg|Y
01|74073|1|1|Above item is non-returnable and non-cancelable|Y
01|74075|1|1|Quoted at net price|Y
01|74076|1|1|5AX-130OSP3-M S/N:5025|N
01|74076|1|2|REFERENCE: RGA# TAR-49951|Y
01|74082|1|1|If order is placed by 5/17/17 delivery will be 6/19/17|Y
01|74082|1|2|If placed after 5/17/17 delivery will need to be|Y
01|74082|1|3|requoted.|Y
01|74087|3|1|NOTE: MZMP5-OD10X is reversible - can do LH and RH|Y
01|74092|4|1|chuck adapter plate|Y
01|74092|5|1|cylinder adapter plate|Y
01|74125|2|1|HSK63F-MMC8C-127 With Makino Pins|Y
01|74141|1|1|Installed with PS-N100VE pull stud at factory|Y
01|74141|4|1|Installed on NC5-100 holder at factory|Y
01|74141|6|1|Installed with PS-N100VE pull stud at factory|Y
01|74141|9|1|Installed on NC5-100 holder at factory|Y
01|74141|11|1|Installed with PS-N100VE pull stud at factory|Y
01|74141|14|1|Installed on NC5-100 holder at factory|Y
01|74143|1|1|C5006-0875-3.75-CP Coolant Port modified|Y
01|74149|1|1|Non-Returnable Non-Cancelable|Y
01|74149|1|2|Quoted as NET pricing|Y
01|74154|1|1|REFERENCE: RGA#TAR-49986|Y
01|74154|1|2|NSVZ180 S/N: 3051|N
01|74155|2|1|NBT40-SF0187-3.54|Y
01|74155|3|1|NBT40-SF0250-3.54|Y
01|74155|4|1|NBT40-SF312-3.54|Y
01|74155|5|1|NBT40-0312-3.54|Y
01|74155|6|1|NBT40-SF0500-3.54|Y
01|74155|9|1|NBT40-SF3-80|Y
01|74155|10|1|NBT40-SF4-80|Y
01|74155|11|1|NBT40-SF6-80|Y
01|74155|12|1|NBT40-SF8-80|Y
01|74155|13|1|NBT40-SF10-80|Y
01|74155|14|1|NB4007-0016-3.50|Y
01|74156|1|1|PART-MIM-170534: M8 x 35 Threaded Pin|Y
01|74156|2|1|PART-MIM-114983: M8 Nut|Y
01|74156|3|1|PART-MIM-113624: 8mm Lock Ring|Y
01|74156|4|1|PART-MIM-113631: M8 Disc with Bevel|Y
01|74168|1|1|Cable set included|Y
01|74168|1|2|TEST FOR SMITH/NEPHEW|Y
01|74168|3|1|PART NUMBER ACTUALLY 5AX-2MT-105-120OSP3-M|Y
01|74168|3|2|CABLE SET INCLUDED|Y
01|74168|3|3|FACTORY REBUILT AVAILABLE|Y
01|74169|2|1|AC100 OFF CLAMP|Y
01|74182|1|1|3~4 pieces List $320.00 less 25%|Y
01|74182|1|2|5 pieces   List $243.00 less 25%|Y
01|74195|6|1|3pcs stock remaining balance at factory. ETA aprox|Y
01|74195|6|2|1-2 weeks upon firm reciept of a PO.|Y
01|74199|1|1|Power and feedback cable sets for CNC201.|Y
01|74199|1|2|Special cables to be made in-house.|N
01|74223|1|1|MNL0071905|Y
01|74223|2|1|MNL0082540|Y
01|74223|3|1|MNL0103175|Y
01|74223|4|1|MNL0200225|Y
01|74223|5|1|MNL0420225|Y
01|74233|2|1|Net price|Y
01|74233|2|2|Lyndex-Nikken to make block upon receipt of spindle|Y
01|74233|2|3|drawing info|Y
01|74251|1|1|HSK125A-Blank|Y
01|74251|1|2|shortest GL is 100mm Dia. 100mm no price break|Y
01|74251|1|3|for 3p & 6p|Y
01|74259|9|1|BT40-SK10-150P|Y
01|74259|23|1|BT40-SK10-150P|Y
01|74267|3|1|External cable set from table to bulkhead.|Y
01|74267|4|1|Machine#7: Hyundia-Kia VX380TD Serial# G3691-80-510|Y
01|74267|4|2|*** Important *** Ladder Logic to drive 2 additonal|Y
01|74267|4|3|axis must be present prior to install.|Y
01|74267|4|4|Installation includes all parts and 1/2 day onsite|Y
01|74267|4|5|technician.|Y
01|74267|4|6|Price is Net|Y
01|74267|7|1|Programmically controlled by M-Code|Y
01|74267|7|2|Positional Index Only via M-Code|Y
01|74267|9|1|Machine#8: Hyundia-Kia VX380TD Serial#VX380TD0265|Y
01|74267|9|2|Cable and M-Code install 1/2 day onsite technician|Y
01|74267|9|3|Price is Net|Y
01|74286|1|1|ref. 133731|Y
01|74286|2|1|ref. 133756|Y
01|74291|1|1|repl nut for SSH25-ECH13-70|Y
01|74293|1|1|MZQT5-BG20Z-MS-C|Y
01|74293|1|2|2 Boring Bar Holder Main/Sub|Y
01|74293|8|1|MZQT5-OD10X-MS|Y
01|74293|8|2|1 Turning Holder Main/Sub|Y
01|74303|1|1|#3 Wedge Plunger for H037M8|Y
01|74303|1|2|This is not a standard stock item for us once an|Y
01|74303|1|3|order is placed it cannot be cancelled or returned.|Y
01|74303|1|4|Manufacturer has 1pcs stock delivery is 2-3 weeks.|Y
01|74303|1|5|If this piece is sold prior to your order being placed|Y
01|74303|1|6|new delivery will be Mid August.|Y
01|74307|1|1|*BMT60|Y
01|74307|2|1|*BMT60|Y
01|74307|6|1|*VDI40|Y
01|74324|8|1|*available in only 1.1/4 Shank Diameter|Y
01|74328|1|1|One time special net price Varel/Hemaq May/2017|Y
01|74353|1|1|KM1.1/4-8.7 Straight Collet|Y
01|74353|1|2|Minimum order 5 pieces|Y
01|74353|2|1|KM1.1/4-6.9 Straight Collet|Y
01|74353|2|2|Minimum Order 5 pieces|Y
01|74355|2|1|Need to measure the original bearing on the table|Y
01|74355|2|2|in order to provide correct size.|Y
01|74355|2|3|This is not recommended for stock order.|Y
01|74368|2|1|*includes 2x Shrink Fit Pots (HSK100)|Y
01|74398|1|1|Standard holder w/ standard nuts|Y
01|74398|5|1|*Standard stock w/ Standard non-coolant nuts|Y
01|74398|6|1|*No standard nuts will need to be returned.|Y
01|74398|9|1|*Standard stock w/ Standard non-coolant nuts|Y
01|74398|10|1|*Pricing Reflects Nut Swap|Y
01|74399|1|1|REFERENCE: RGA# TAR-49832|Y
01|74399|1|2|5AX-2MT-130-170BAYA-BR S/N:N/A Air leaking into rotary|Y
01|74399|1|3|table body and oil leaking out.|Y
01|74399|3|1|1PC stock 1PC 5/30|Y
01|74399|11|1|1 PC stock 1PC pending|Y
01|74402|1|1|Repair of customer's W1505-0562-6.82|Y
01|74402|1|2|Reference RGA# TOR-49977|Y
01|74412|1|1|REFERENCE: RGA# TAR-49984|Y
01|74412|1|2|5AX-201YA S/N:4217 Table was in a machine and crashed.|Y
01|74434|1|1|Repair of customer's T32394C01 s/n: A0008|Y
01|74434|1|2|Reference RGA# LVR-49953|Y
01|74434|2|1|Spindle bearings seals & o-rings must be replaced.|Y
01|74434|2|2|Labor is included.|Y
01|74441|1|1|Repair of customer's MNZ20-ER25Z-MS s/n: A0005 (T32276)|Y
01|74441|1|2|Reference RGA# LVR-49963|Y
01|74441|2|1|Collet Nuts bearings seals & o-rings must be replaced|Y
01|74441|2|2|Labor is included.|Y
01|74451|1|1|Core Trade-In for damaged 1x OKL3-ER32Z-C-7MP|Y
01|74451|1|2|s/n: 56085 01|Y
01|74451|1|3|Reference RGA# LVR-49949|Y
01|74468|1|1|KM1.1/4-8.7 Straight Collet|Y
01|74468|1|2|Minimum order 5 pieces|Y
01|74468|2|1|KM1.1/4-6.9 Straight Collet|Y
01|74468|2|2|Minimum Order 5 pieces|Y
01|74488|3|1|Quoted as NET pricing|Y
01|74488|3|2|This item is Non-ReturnableNon-Cancelable|Y
01|74505|1|1|*** Confirm machine MAKE MODEL & Positioning Block ***|Y
01|74505|1|2|Information about application is required to release|N
01|74505|1|3|its angular head for shipment.|N
01|74505|2|1|*** Confirm machine MAKE MODEL & Positioning Block ***|Y
01|74505|3|1|This positioning block must be modified by your own to|Y
01|74505|3|2|fit on machine spindle and work properly.|Y
01|74514|1|1|Quoted as NET pricing|Y
01|74514|1|2|Non-ReturnableNon-Cancelable|Y
01|74514|3|1|Quoted as NET pricing|Y
01|74514|3|2|Non-returnable Non-cancelable|Y
01|74529|1|2|Non-Returnable Non Cancelable|Y
01|74535|1|1|200MM tilt rotary table with Haas motors and cable sets|Y
01|74545|1|1|*Standard stock w/ Standard non-coolant nuts|Y
01|74560|1|1|CAT50-Q34-140U|Y
01|74561|1|1|CKFN12-6C Coolant Through Nut for C12 Milling Chuck|Y
01|74561|8|1|NBT30-SK13C-60-J Taper Plus BT30 Taper SK13 Slim Chuck|Y
01|74561|8|2|60mm GL with Coolant Nut installed prior to shipping.|Y
01|74580|1|1|BT45-BCB62-210|Y
01|74582|2|1|Price reflects net charge for DIN modification|Y
01|74599|1|1|Standard holder w/ standard nuts|Y
01|74599|5|1|*Standard stock w/ Standard non-coolant nuts|Y
01|74599|6|1|*No standard nuts will need to be returned.|Y
01|74599|9|1|*Standard stock w/ Standard non-coolant nuts|Y
01|74599|10|1|*Pricing Reflects Nut Swap|Y
01|74619|3|1|S-NC5-46-C25-165  installed w/PS-N46E pull stud|Y
01|74619|4|1|installed on NC5 holder at factory|Y
01|74619|5|1|S-NC5-46-FMA38.1CS-45-M Installed w/ PS-N46E pull stud|Y
01|74619|6|1|Installed on NC5 holder at factory|Y
01|74619|7|1|S-NC5-46-FMA25.4-90 Installed w/ PS-N46E pull stud|Y
01|74619|8|1|Installed on NC5 holder at factory|Y
01|74619|9|1|Installed w/ PS-N46E pull stud|Y
01|74619|10|1|Installed on NC5 holder at factory|Y
01|74619|13|1|Insalled on NC5 holder at factory|Y
01|74619|14|1|25-talled w/PS-N46E pull stud|Y
01|74619|15|1|Installed on NC5 holder at factory|Y
01|74619|16|1|installed w/PS-N46E pull stud|Y
01|74619|17|1|Installed on NC5 holder at factory|Y
01|74619|18|1|installed w/PS-N46E pull stud|Y
01|74619|19|1|Installed on NC5 holder at factory|Y
01|74619|20|1|S-NC5-46-SK10C-150 installed w/PS-N46E pull stud|Y
01|74619|21|1|Installed on NC5 holder at factory|Y
01|74619|22|1|installed w/PS-N46E pull stud|Y
01|74619|23|1|Installed on NC5 holder at factory|Y
01|74619|24|1|installed w/PS-N46E pull stud|Y
01|74619|25|1|To be installed on NC5 er at the factory|Y
01|74619|27|1|installed w/ PS-123E pull stud|Y
01|74619|28|1|installed on NC5-46-SK16C-90 holder|Y
01|74619|30|1|ETA 2 WKS|Y
01|74667|1|1|Slotted plate 12mm width (8X)|Y
01|74673|1|1|REFERENCE:RGA#TAR-50015|Y
01|74673|1|2|5AX-130 S/N:4974 Tool crashed|Y
01|74674|4|1|Interface kit data sheets are required before shipment|Y
01|74675|1|1|Repair of customer's CAT50-UMT200|Y
01|74675|1|2|Reference RGA# TOR-50008|Y
01|74675|4|1|9V Battery must be replaced.|Y
01|74677|7|1|Note on modified block the price listed is a NET charge|Y
01|74686|1|1|REFERENCE: RGA# TAR-49988|Y
01|74686|1|2|5AX-2MT-105-120FA S/N:8093 Send in for repair.|Y
01|74687|1|1|Repair of customer's 2x NC5-63S-F50-220-14|Y
01|74687|1|2|Reference RGA# TOR-49960|Y
01|74687|7|1|Quantity reflects hours of labor.|Y
01|74694|8|1|NOTE: This item is subject to final approval based on|Y
01|74694|8|2|machine make model and right angle head it is used|Y
01|74694|8|3|with|Y
01|74700|1|1|EAKATS42524 - OIL SEAL|Y
01|74700|2|1|SAAEAKATS65857 - SEAL|Y
01|74700|3|1|EAK7011ATYSUMP5 - BALL BEARING|Y
01|74700|4|1|EAK7009ATYSUMP5 - BALL BEARING|Y
01|74739|1|1|Repair of customer's C40RA-0025 tool is having|Y
01|74739|1|2|vibration and is very noisy.|Y
01|74739|1|3|Reference RGA# CUR-50016|Y
01|74752|1|1|CAT40-HC12-80   Hydraulic Holder 12MM X 80mm Gage|Y
01|74752|2|1|BT40-HC12-90   Hydraulic Holder 12MM X 90mm Gage|Y
01|74753|2|1|AIR ACTUATED MATCHING TAILSTOCK FOR CNCZ-100-2W|Y
01|74753|7|1|MANUAL CLAMPING 5C.|Y
01|74753|8|1|4TH INTERFACE INCLUDES DRIVE CABLES FIBRE OPTICS|Y
01|74753|8|2|TRAVEL AND LABOR|Y
01|74753|12|1|SINGLE SPINDLE TABLE|Y
01|74754|1|1|HSK63A(80)-C1.1/4-110G-IDU|Y
01|74754|1|2|Nikken Hi Speed Milling Chuck|Y
01|74754|4|1|HSK63A(80)-C1-110G-IDU|Y
01|74754|4|2|Nikken Hi Speed Milling Chuck|Y
01|74754|7|1|HSK63A(80)-C1.1/4-110-IDU|Y
01|74754|7|2|Nikken Milling Chuck w/Spanner Nut|Y
01|74754|10|1|HSK63A(80)-C1-110-IDU|Y
01|74754|10|2|Nikken Milling Chuck with Spanner Nut|Y
01|74772|1|1|Special Stub Mill Arbor for Pratt & Whitney|Y
01|74772|1|2|Tool No: SK16785 per drawing.|Y
01|74772|1|3|Net price includes bolt and key.|Y
01|74772|1|4|Quoted as 12 or 3 pieces.|Y
01|74805|1|1|COMPARABLE KTW N-SERIES|Y
01|74807|3|1|PER APPLICATION HYD. SOURECE REQUIRED FOR ROTARY BRAKE|Y
01|74807|3|2|TAILSTOCK AND CHUCK ALSO HYDRAULIC|Y
01|74807|3|3|EXTERNAL CABLES INCLUDED|Y
01|74807|11|1|HYDRAULIC CYLINDER FOR QUICK CHANGE COLLET SYSTEM|Y
01|74807|14|1|HYD CHUCK ADAPTER PLATE FOR QUICK CHANGE COLLET SYSTEM|Y
01|74807|21|1|HYD. UNIT INCLUDES 3 PORT MANIFOLD AND SOLENOID|Y
01|74807|21|3|ALL FUNTIONS SUCH AS CHUCK ACTIVATION OF TAILSTOCK|Y
01|74807|21|4|TO BE DONE THROUGH MACHINE TOOL. NO MANUAL SWITCHES.|Y
01|74807|21|5|OR FOOT PEDALS QUOTED|Y
01|74815|9|1|H80F-SF0625-3.00B|Y
01|74815|9|2|HSK80F 5/8 Shrink Fit|Y
01|74815|9|3|Pre-Balanced/Balanceable Makino PIN|Y
01|74815|10|1|H80F-SF0750-3.00B|Y
01|74815|10|2|HSK80F 3/4 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|74815|10|3|PIN|Y
01|74815|13|1|With Makino Pins|Y
01|74815|14|1|HSK80F-ER25-3.00B   Collet Chuck|Y
01|74815|14|2|Pre-Balanced Balanceable w/Makino Pins|Y
01|74815|15|1|HSK80F-ER32-3.00B|Y
01|74815|15|2|HSK80F ER32 HiTorq Collet Chuck|Y
01|74815|15|3|Pre-Balanced Balanceable w/Makino Pins|Y
01|74815|16|1|HSK80F-ER40-3.00B|Y
01|74815|16|2|HSK80F ER20 HiTorq Collet Chuck|Y
01|74815|16|3|Pre-Balanced Balanceable w/Makino Pins|Y
01|74815|17|1|HSK80F-SM0750-1.968B|Y
01|74815|17|2|HSK80F 3/4 Shell Mill Holder Balanceable|Y
01|74815|17|3|With Makino Pins|Y
01|74815|18|1|HSK80F-SM0750-1.968  HSK80F 3/4 Shell Mill Holder|Y
01|74815|18|2|With Makino Pins|Y
01|74828|1|1|ETA 2 WKS|Y
01|74830|2|1|*Net charge|Y
01|74830|6|1|*Net charge|Y
01|74836|2|1|CAT50-C1F-105-IDU-DIN|Y
01|74836|2|2|CAT50 1.00 Milling Chuck w 105 G.L. DIN|Y
01|74836|4|1|CAT50-C3/4F-135U-IDU-DIN|Y
01|74836|4|2|CAT50 3/4 Milling Chuck w 135 G.L. DIN|Y
01|74836|6|1|CAT50-C3/4F-105U-IDU-DIN|Y
01|74836|6|2|CAT50 3/4 Milling Chuck w 105 G.L. DIN|Y
01|74855|1|1|Please note quoted at net price.|Y
01|74863|1|1|Repair of customer's B40RAM-ER20-232ST s/n: 54295 01|Y
01|74863|1|2|Mim# 181476|Y
01|74863|1|3|Reference RGA# CUR-49989|Y
01|74863|2|1|Back cover plate gears bearings seals & o-rings|Y
01|74863|2|2|must all be replaced. Shims will need to be adjusted.|Y
01|74863|2|3|Taper has some wear and discoloration this will be|Y
01|74863|2|4|cleaned up as much as possible.|Y
01|74870|1|1|*10pc min|Y
01|74870|2|1|*10pc min|Y
01|74870|3|1|*10pc min|Y
01|74870|5|1|Once inventory depleted considered discontinued|Y
01|74887|1|1|Motor and wiring being provided by the customer|Y
01|74944|1|1|Ref: TAR-50030|Y
01|74944|1|2|CNC180LFA S/N# 7486 Spindle is moving in/out when|Y
01|74944|1|3|brake actuated.|Y
01|74944|34|1|NIK-1W0340-1100S : Rod Seal|Y
01|74944|35|1|NIK-1W0340-950S : Rod Seal|Y
01|74944|36|1|NIK-1W0340-1350K : Piston Seal|Y
01|74944|37|1|Direct mount cable set|Y
01|74948|2|1|Net Charge|Y
01|74954|1|1|HH9C-115 R-2986 2 Replacement Cylinder on Okuma SV-250|Y
01|74956|2|1|Special discount for 10 or more holders.|Y
01|74967|3|1|Adpater Plate for Pueumatic Clamp.|Y
01|74967|3|2|Please provide drawing of clamp|Y
01|74967|3|3|Approval drawing will be provided 1 Week ARO|Y
01|74967|4|1|Includes all parts interface and 1/2 day onsite|Y
01|74967|4|2|technician.|Y
01|74967|4|3|Multiple machine discount:|Y
01|74967|4|4|3 Machines less $1.5K per machine|Y
01|74967|4|5|2 Machines less $1.0K per machine|Y
01|74969|2|1|Installation includes: Drive unit short bar fiber|Y
01|74969|2|2|optic cable communications cable bulkhead cables|Y
01|74969|2|3|external cables parameter changes service time and|Y
01|74969|2|4|travel.|Y
01|74975|1|1|OKEX-ER40Z|Y
01|74979|1|1|Reference:RGA# TAR-50047|Y
01|74979|1|2|5AX-200II Rotary axis only was sent.|Y
01|74979|1|3|Needs rebuild backlash & oil leak.|Y
01|75000|2|1|Delivery 1 week after receipt of PO and spindle|Y
01|75000|2|2|drawing confirmation.|Y
01|75004|1|1|QUOTED AT NET PRICE. ITEM IS USED|Y
01|75009|1|1|Non returnable Non cancellable|Y
01|75009|2|1|Coolant Port 2 holes 180 degrees apart|Y
01|75031|5|1|A tariff surcharge of 8% will be added to every order|Y
01|75031|5|2|placed after September 1st 2025(until further notice).|Y
01|75031|5|3|This surcharge will be acknowledged upon acceptance|Y
01|75031|5|4|of every order.|Y
01|75042|1|1|Cust look for GSKN-6GJ|N
01|75050|9|1|Delivery= Soft 2 wks/ Hard 5 wks|Y
01|75053|2|1|Installation kit: Drive unit bulkhead cables fiber|Y
01|75053|2|2|optic cables external cables communications cables.|Y
01|75053|3|1|$1000.00 free tooling promotion.|Y
01|75063|1|1|overnight|Y
01|75064|1|1|Customer needs overnight...line down|Y
01|75065|1|1|ship overnight|Y
01|75067|3|1|Installtion includes: Drive unit short bar fiber|Y
01|75067|3|2|optic cable communications cable bulkhead cables|Y
01|75067|3|3|external cables paraemter changes service time and|Y
01|75067|3|4|travel.|Y
01|75075|14|1|NK103-99049 Adjustable Angle LT|Y
01|75075|15|1|NK103-99049A Adjustable Angle LT|Y
01|75105|1|1|180MM table with motor external cable set|Y
01|75105|1|2|installation kit.|Y
01|75105|3|1|200MM table with motor external cable set|Y
01|75105|3|2|installtion kit.|Y
01|75105|5|1|260MM table with motor external cable set|Y
01|75105|5|2|installation kit.|Y
01|75105|8|1|300MM table with motor external cable set|Y
01|75105|8|2|installtion kit.|Y
01|75105|20|1|West Coast install includes: Cable set installation|Y
01|75105|20|2|parameter changes service time and travel.|Y
01|75105|21|1|DMG Mori Davis factory install includes: Cable set|Y
01|75105|21|2|installationparameter changes service time and travel|Y
01|75121|1|1|List Price: $12600.00|Y
01|75121|1|2|Core Deposit: -$1500.00|Y
01|75121|2|1|Direct Mount Cable Set|Y
01|75130|1|1|Repair: RGA# CUR-50036|Y
01|75130|1|2|C40RA-0025 TIR is bad and bearings are bad.|Y
01|75144|2|1|Wrench is free with purchase of ER16 collet chuck.|Y
01|75157|1|1|MNZ20-CH12Z-C  is Mori T13135|Y
01|75161|1|1|Non-REturnable Non-cancelable|Y
01|75164|1|1|3P-F2(HTI10)|Y
01|75167|2|1|#21 V-50 V-Ring|Y
01|75169|1|1|Repair of customer's MZQT47-ER25X-OFF-HS s/n: 5198104|Y
01|75169|1|2|Mim# 124067|Y
01|75169|1|3|Reference RGA# LVR-50040|Y
01|75169|2|1|All bearings seals and o-rings must be replaced.|Y
01|75169|2|2|Labor is included.|Y
01|75182|1|1|**Machine is also available in 380-480V Power Supply|Y
01|75182|1|2|Compatible with h6 tolerance steel HSS Carbide|Y
01|75182|2|1|*2 chuck pots come with purchase of machine|Y
01|75182|6|1|Shrink Fit: Pot/Chuck Holder Capto 6|Y
01|75182|6|2|*Will not be anodized|Y
01|75182|7|1|Shrink Fit: Pot/Chuck Holder Capto 8|Y
01|75182|7|2|*Will not be anodized|Y
01|75187|1|1|MS103-10090: Rear Cap|Y
01|75188|1|1|Repair of 1x CAT50-C3/4-105U Missing a snap ring.|Y
01|75188|1|2|Reference RGA# TOR-50049|Y
01|75188|3|1|Labor charges for 1x CAT50-C3/4-105U|Y
01|75188|5|1|Repair of 2nd CAT50-C3/4-105U Needs to be cleaned|Y
01|75188|5|2|and regreased.|Y
01|75188|6|1|Labor charges for 2nd CAT50-C3/4-105U|Y
01|75188|8|1|1x CAT50-C1.1/4-90U must be cleaned and re-greased.|Y
01|75188|9|1|Labor charges for 1x CAT50-C1.1/4-90U|Y
01|75188|11|1|1x CAT50-C1.1/4-165U sent in for evaluation is|Y
01|75188|11|2|un-repairable due to collapsed bore.|Y
01|75194|1|1|Tooling Certificate Number: 13712TA-947-040717|Y
01|75194|39|1|*Stocked extension - overall length 6.67|Y
01|75202|2|1|100MM Twin Spindle table with S500 installation kit.|Y
01|75202|2|2|INTERFACE HARDWARE FOR TCS-2D|Y
01|75202|4|1|REQUEST TAILSTOCK WITH MORSE TAPER. THESE ARE|Y
01|75202|4|2|INTERCHANGEABLE|Y
01|75202|4|3|MORSE TAPER 2 3 4 AVAILABLE|Y
01|75202|4|4|MORSE TAPER CENTER NOT INCLIDED SOCKET ONLY|Y
01|75205|2|1|Installation includes: Drive unit short bar fiber|Y
01|75205|2|2|optic cable communications cable bulkhead cable|Y
01|75205|2|3|external cable parameter changes service time and|Y
01|75205|2|4|travel.|Y
01|75206|3|1|M-code installation|Y
01|75209|16|1|This tool is non standard stock once a purchase order|Y
01|75209|16|2|is placed it cannot be cancelled or returned.|Y
01|75220|1|1|H63A-SF1000-3.00|Y
01|75220|1|2|Non-returnable Non-cancelable|Y
01|75220|2|1|H63A-SF0750-3.50|Y
01|75220|2|2|Non-returnable Non-cancelable|Y
01|75220|3|1|H63A-SF1000-4.00|Y
01|75220|3|2|Non-returnable Non-cancelable|Y
01|75220|4|1|H63A-SF1000-6.00|Y
01|75220|4|2|Non-returnable Non-cancelable|Y
01|75243|1|1|CNCZ180LSA3 s/n: 5009 Shifts position when machining.|Y
01|75243|1|2|Reference RGA# TAR-50013|Y
01|75277|4|1|CAT40-C7/8-120U is a Special and I will need to|Y
01|75277|4|2|request pricing from Nikken Japan. Can they use a|Y
01|75277|4|3|CAT40-C1.1/4SL-120U-IDU?|Y
01|75297|1|1|T00433  1-1/4 x 1-1/4 OD Cutting Tool Holder|Y
01|75297|1|2|for NLX 6000|Y
01|75297|3|1|T10204  2-1/2 Boring Bar Holder|Y
01|75297|3|2|for NLX6000|Y
01|75299|1|1|Shrink Fit Machine in house at Yamazen reference|Y
01|75299|1|2|serial # 5J311.|Y
01|75308|1|1|Installation includes: labor travel time expenses|Y
01|75308|1|4|travel.|Y
01|75328|3|1|Direct Mount Mitsubishi Feedback Cable|Y
01|75328|4|2|Direct Mount Mitsubishi Power Cable|Y
01|75338|1|1|Net price quoted.|Y
01|75365|1|1|ETA 10 WEEKS|Y
01|75365|1|2|Quoted as NET Pricing Non-returnable Non-cancelable|Y
01|75365|2|1|Quoted as NET Pricing Non-returnable Non-cancelable|Y
01|75365|2|2|ETA 10 WEEKS|Y
01|75365|3|1|Quoted as NET Pricing Non-returnable Non-cancelable|Y
01|75365|3|2|ETA 10 WEEKS|Y
01|75375|3|1|BT50-Z24-187|Y
01|75375|5|1|ZMK24-3/8P|Y
01|75375|6|1|ZMK24-1/2P|Y
01|75375|7|1|BT50RAM-MI40-190|Y
01|75388|1|1|5AX-DD200BF2-4+2PRJ  5 Axis Direct Drive|Y
01|75388|1|2|Nikken Rotary Table With Rotary Joint|Y
01|75388|1|3|External Cables Included in Price.|Y
01|75388|1|4|Quoted as Net price|Y
01|75401|6|1|Above price is for hard balance & jet slot modification|Y
01|75401|10|1|Above price is for hard balance & jet slot modification|Y
01|75401|13|1|Above price is for hard balance & jet slot modification|Y
01|75403|2|1|May be used to hold 7/32 tool.|Y
01|75412|1|1|Tilt table w/o motors with motor covers|Y
01|75438|6|1|$6500.00 per machine allowance.|Y
01|75442|3|1|DIN Modification  net charge on above holder|Y
01|75459|1|1|Tooling Certificate Number: 13712TA-947-040717|Y
01|75459|39|1|*Stocked extension - overall length 6.67|Y
01|75464|2|1|Nut Threading Modification may be necessary. Lead time|Y
01|75464|2|2|based on gauge of threading and availability.|Y
01|75466|1|1|SW20-N Roto Disk|Y
01|75466|1|2|This is a special coolant seal manufactured in Germany.|Y
01|75466|1|3|Once a purchase order is placed it cannot be cancelled|Y
01|75466|1|4|or returned.|Y
01|75474|1|1|6pcs to replace HSK32E-SF4-60B|Y
01|75474|2|1|4pc to exchange with std H32E-SF3-70 (3mm)|Y
01|75476|2|1|Installation includes: Drive unit short bar fiber|Y
01|75476|2|2|optic cable communications cable bulkhead cable|Y
01|75476|2|3|external cables parameter changes service time and|Y
01|75476|2|4|travel.|Y
01|75491|1|1|includes motors|Y
01|75502|1|1|REFERENCE: RGA# TAR-49988|Y
01|75502|1|2|5AX-2MT-105-120FA S/N:8093 Send in for repair.|Y
01|75525|1|1|Please make sure the collet has .194 shank and .152|Y
01|75525|1|2|drive square.|Y
01|75538|1|1|Repair of cutomer's T32106 S/N#A0011|Y
01|75538|1|2|Ref: RGA# LVR-49953|Y
01|75538|2|1|Bearings Seals O-rings and Gears must be replaced.|Y
01|75538|2|2|Labor is include.|Y
01|75554|1|1|4th axis table for Genos 460 Must confirm Okuma control|Y
01|75554|1|2|EXTERNAL CABLES ARE INCLUDED!!!|Y
01|75554|1|3|SPECIAL PRICING PER ALEX AND BOB|Y
01|75554|5|1|LYNDEX NIKKEN TOOL CERTIFICATE $ 1000 VALUE  NO CHARGE|Y
01|75560|5|1|Includes solenoid pressure switch hose with quick|Y
01|75560|5|2|disconnects.|Y
01|75564|1|1|ETA aprox 3-5 business days.|Y
01|75566|1|1|400MM table with Alpha 22 high voltage motor.|Y
01|75566|3|1|Heidenhain +/-5 seconds scale with mounting kit.|Y
01|75566|3|2|RCN2390|Y
01|75585|7|1|To be delivered with Coolant Nuts installed on Holder.|Y
01|75585|7|2|No further discount is to be taken from this holder.|Y
01|75585|7|3|Given in terms of NET Price|Y
01|75585|9|1|To be delivered with Coolant Nut installed on Holder.|Y
01|75585|9|2|No further discount is to be taked from this Holder.|Y
01|75585|9|3|Given in terms of NET Price.|Y
01|75599|7|1|To be delivered with Coolant Nuts installed on Holder.|Y
01|75599|7|2|No further discount is to be taken from this holder.|Y
01|75599|7|3|Given in terms of NET Price|Y
01|75599|9|1|To be delivered with Coolant Nut installed on Holder.|Y
01|75599|9|2|No further discount is to be taked from this Holder.|Y
01|75599|9|3|Given in terms of NET Price.|Y
01|75601|1|1|Cables not included|Y
01|75605|1|1|DELIVERY INFO:|Y
01|75605|1|2|1 TABLE END OF JULY|Y
01|75605|1|3|1 TABLE MID AUGUST|Y
01|75605|1|4|TABLE IS BACK MOUNT DESIGN|Y
01|75606|8|1|Special Order. Unit Price Each.|Y
01|75607|1|1|w/ Makino Pins|Y
01|75607|2|1|w/ Makino Pins|Y
01|75616|1|1|OMEGA73 6g|Y
01|75619|7|1|*net price|Y
01|75619|7|2|*Delivery is upon receipt of spindle drawing info|Y
01|75624|1|1|TAT-200 s/n: 1036 Sent in for evaluation.|Y
01|75624|1|2|Reference RGA# TAR-50094|Y
01|75627|1|1|Special Grinding Head by Pibomulti|Y
01|75627|1|2|Special Order. Unit Price Each.|Y
01|75629|1|1|Taper Plus CAT40-Taper Modular Section|Y
01|75629|1|2|Non-returnable Non-cancelable|Y
01|75629|1|3|Quoted as NET pricing|Y
01|75629|2|1|Taper Plus CAT40-Taper Modular Section|Y
01|75629|2|2|Non-returnable Non-cancelable|Y
01|75629|2|3|Quoted as NET pricing|Y
01|75629|3|1|Taper Plus CAT40 ER25 Standard RAH No Coolant Max 30Nm|Y
01|75629|3|2|8000 RPM|Y
01|75629|3|3|Non-returnable Non-cancelable|Y
01|75629|3|4|Quoted as NET pricing|Y
01|75629|4|1|Taper Plus CAT40 ER25 Standard RAH No Coolant Max 30Nm|Y
01|75629|4|2|8000 RPM|Y
01|75629|4|3|Non-returnable Non-cancelable|Y
01|75629|4|4|Quoted as NET pricing|Y
01|75646|2|1|Net charge to open keyway depth and re-balance|Y
01|75646|2|2|C4011-1250-4.00|Y
01|75648|1|1|Cable is special made for Borg Warner.|Y
01|75660|1|1|ER25 Internal Coolant Straight Tool|Y
01|75660|1|2|Biglia Interface Max 6500rpm 50Nm|Y
01|75660|1|3|Net price reflects purchase of 1 to 2 pieces.|Y
01|75660|3|1|ER25 Internal Coolant Straight Tool|Y
01|75660|3|2|Biglia Interface Max 6500rpm 50Nm|Y
01|75660|3|3|Net price reflects purchase of 3 to 4 pieces.|Y
01|75660|5|1|ER25 Internal Coolant Straight Tool|Y
01|75660|5|2|Biglia Interface Max 6500rpm 50Nm|Y
01|75660|5|3|Net price reflects 5 to 9 pieces.|Y
01|75660|7|1|ER25 Internal Coolant Straight Tool|Y
01|75660|7|2|Biglia Interface Max 6500rpm 50Nm|Y
01|75660|7|3|Net price reflects 10+ pieces.|Y
01|75686|1|1|Repair of customer's T32394C01 s/n: A0008|Y
01|75686|1|2|Reference RGA# LVR-49953|Y
01|75686|2|1|Spindle bearings seals & o-rings must be replaced.|Y
01|75686|2|2|Labor is included.|Y
01|75701|1|1|jEFFREYS TO SUPPLY MOTOR AND CABLES FOR LYNDEX NIKKEN|Y
01|75701|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|75701|1|3|CONFIRMATION OF PROPER FIT TO MACHINE MUST BE VERIFIED|Y
01|75702|1|1|MUST CONFIRM CONTROL ON M460|Y
01|75702|1|2|EXTERNAL POWER/FEEDBACK CABLES INCLUDED|Y
01|75706|1|1|HSK63F w/ Makino Pins Special Right Angle Head ER11|Y
01|75706|1|2|Output 1:1.67 Gear Ratio Max 6Nm Tq 12K RPM|Y
01|75706|1|3|Non Coolant|Y
01|75710|1|1|Ref: RGA# TAR-50094|Y
01|75710|1|2|CNC300LMA SN# 1325 it was off by 10 deg.|Y
01|75731|4|1|External cable sets wiring diagram required|Y
01|75731|5|1|Installation Includes: Drive amp bulkhead cable set|Y
01|75731|5|2|fiber optic cable communications cable parameter|Y
01|75731|5|3|changes trvel and labor|Y
01|75743|3|1|MODIFICATION OF EXISTING 5AX-201FA-M TO 5AX-201BAHFA-M|Y
01|75743|3|2|INCLUDES RISER BLOCK 6 PORT ROTARY UNION BACK MOUNT|Y
01|75743|3|3|MOTOR PLATE GEAR SET MOTOR COVER EXTERNAL CABLE SET|Y
01|75743|3|4|AND LABOR AT LYNDEX NIKKEN|Y
01|75743|3|5|THIS TABLE WILL BE SAME AS TABLE SERIAL #5310|Y
01|75743|3|7|DELIVERY SCHEDULE|Y
01|75743|3|8|1 TABLE (JTEKT) TO SEND EXISTING TABLE TO LYNDEX NIKKEN|Y
01|75743|3|9|CAN BE COMPLETED BY 7/7|Y
01|75743|3|10|2ND TABLE TO BE COMPLETED BY 7/27|Y
01|75748|2|1|1 table only with electronics|Y
01|75752|4|1|1`TABLE ONLY. ALL ELECTRONICS SHEETMETAL JUNCTION|Y
01|75752|4|2|BOX INCLUDED|Y
01|75771|4|1|This unit replaces: MNL12-ER32X-C-2MP|Y
01|75774|1|1|CNC401FA s/n: 6924 converted to CNCZ401FA s/n: 6924|Y
01|75774|1|2|Reference RGA# TAB-50074|Y
01|75777|1|1|5AX-130BAYABR-QT SET|Y
01|75777|1|2|Includes: Two tables with backhand mounted motors|Y
01|75777|1|3|with junction box and sheet metal divider drive units|Y
01|75777|1|4|and cabling.|Y
01|75777|5|1|Hydraulic cylinder with draw tube|Y
01|75777|6|1|Hydraulic unit with hoses and actuator|Y
01|75778|12|1|CAT40-SK16-120UP-IDU-J SKN-16BJ(GH) Coolant nut to be|Y
01|75778|12|2|installed prior to shipping. NET PRICE quoted reflects|Y
01|75778|12|3|this. Do Not take further discount from this NET PRICE.|Y
01|75778|13|1|CAT40-SK25-90UP-IDU-J SKN-25BJ(GH) Coolant nut to be|Y
01|75778|13|2|installed prior to shipping. NET PRICE quoted reflects|Y
01|75778|13|3|this. Do Not take further discount from this NET PRICE.|Y
01|75778|14|1|CAT40-SK6-120UP-IDU-J SKN-6WBJ(GH) Coolant nut to be|Y
01|75778|14|2|installed prior to shipping. NET PRICE quoted reflects|Y
01|75778|14|3|this. Do Not take further discount from this NET PRICE.|Y
01|75778|15|1|To be installed on CAT40-SK16-120UP-IDU prior to ship|Y
01|75778|15|2|No need to place on order. Just for inventory hold.|Y
01|75778|16|1|To be installed on CAT40-SK25-90UP-IDU prior to ship|Y
01|75778|16|2|No need to place on order. Just for inventory hold.|Y
01|75778|17|1|To be installed on CAT40-SK6-120UP-IDU prior to ship|Y
01|75778|17|2|No need to place on order. Just for inventory hold.|Y
01|75783|1|1|Ref: RGA# TAR-50055|Y
01|75783|1|2|5AX-130 Operator had a tool crash the accuracy &|Y
01|75783|1|3|repeatabillity is off.|Y
01|75784|1|1|Replaces Std BT30-C1-80|Y
01|75784|8|1|*Special. Non-returnable/non-cancellable|Y
01|75786|1|1|4 stock others 6 will be on 06/22|Y
01|75790|1|1|QTY 1-10 PC PRICE|Y
01|75790|2|1|QTY 11-20 PC PRICE|Y
01|75790|3|1|QTY 21-30 PRICE|Y
01|75790|4|1|QTY 30+ Price|Y
01|75793|1|1|Ref: RGA# TOR-50029|Y
01|75793|1|2|1xCAT40-UMT200 Unit was crashed.|Y
01|75808|1|1|Custom Positioning Block for Angleheads on SO#739855|Y
01|75808|1|2|Customer to install bushings provided.|Y
01|75824|1|1|Repair of customer's OKL3-ER32X S/N# AL1227|Y
01|75824|1|2|Ref: RGA# LVR-50005|Y
01|75824|2|1|Bearings Collet Nuts Seals O-rings must be replaced.|Y
01|75824|2|2|Labor is included.|Y
01|75824|3|1|55% discount qouted for WH2 (Used) items to replace|Y
01|75824|3|2|2 X units sent in for evaluation that are not Alps|Y
01|75824|3|3|unit. WH2 items are factory re-built and have a 1 year|Y
01|75824|3|4|warranty.|Y
01|75826|1|1|Repair of customer's T32216 S/N# A1812|Y
01|75826|1|2|Ref: RGA# LVR-50031|Y
01|75826|2|1|Bearings Collet Nuts Seals O-rings must be replaced.|Y
01|75826|2|2|Labor is included.|Y
01|75837|1|1|Repair of Tool #1: C4005-0562-4.47|Y
01|75837|1|2|Reference RGA# TOR-50045|Y
01|75837|5|1|Repair of Tool #2: C4005-0562-4.47|Y
01|75837|10|1|Replacements for tool #3 & #4 significant internal|Y
01|75837|10|2|rust.  Recommend replacement for both.|Y
01|75837|12|1|Quoting replacements for Tool #1 & #2.|Y
01|75837|12|2|It may be more cost effective to replace than repair.|Y
01|75855|1|1|Reference RGA# LVR-49360|Y
01|75855|1|2|MZMP47-MI50X-OFF-C s/n: 43000 01|N
01|75855|2|1|Bearings seals and o-rings are worn and must be|Y
01|75855|2|2|replaced. Labor is included.|Y
01|75873|1|1|NET PRICE|Y
01|75879|1|1|Replaces old part# 16-ZMAC32-55|Y
01|75881|3|1|4 in stock if ordered today 2 back order will ship|Y
01|75881|3|2|within 2 weeks|Y
01|75889|1|1|CAT40-SF12-XXX|Y
01|75889|1|2|CAT40 12mm Dia. with 8.5 g.l|Y
01|75889|1|3|last 1.9 of holder nose needs to have OD of .780 for|Y
01|75889|1|4|clearance purposes.|Y
01|75901|1|1|installed with PS-N46E pull stud at factory|Y
01|75901|3|1|Installed on NC5-46-C20-80G at factory|Y
01|75910|3|1|***No Charge***|Y
01|75910|5|1|***No Charge***|Y
01|75910|8|1|***No Charge***|Y
01|75914|2|1|Quoted as NET pricing|Y
01|75922|1|1|Torque Wrench Body - Attachments Sold Separate|Y
01|75927|2|1|THIS TABLE HAS HYD. BRAKE CLAMPING/ WILL NEED HYD UNIT|Y
01|75927|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|75927|20|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|75927|20|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|75927|20|3|THIS COST DOES NOT INCLUDE ADDITIONAL AXIS PARAMETERS|Y
01|75927|20|4|THAT FANUC NEEDS TO INSTALL|Y
01|75927|20|5|NO CUSTOMER CABLE MANAGEMENT INCLUDED|Y
01|75946|2|1|THIS TABLE HAS HYD. BRAKE CLAMPING/ WILL NEED HYD UNIT|Y
01|75946|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|75946|20|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|75946|20|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|75946|20|3|THIS COST DOES NOT INCLUDE ADDITIONAL AXIS PARAMETERS|Y
01|75946|20|4|THAT FANUC NEEDS TO INSTALL|Y
01|75946|20|5|NO CUSTOMER CABLE MANAGEMENT INCLUDED|Y
01|75947|2|1|5AX-4MT-105-120YA-M Multi-Spindle Tilting Rotary Table|Y
01|75947|10|1|Quick-Change Trunnion Table|Y
01|75947|10|2|Only supplied with Rotary Table|Y
01|75947|10|3|Fixture is not included in the Trunnion cost.|Y
01|75975|8|1|MI50-STA#6|Y
01|75975|9|1|Quoted Net price and once a order is placed it cannot|Y
01|75975|9|2|be cancelled or returned.|Y
01|75978|2|1|Includes Labor @ GKN Celaya Mex.|Y
01|75978|2|2|Amplifier or interface cables are not included|Y
01|75978|2|3|Must confirm Amplifier part number before installation|Y
01|75978|3|1|Delivery at PDQ by BC Global|Y
01|75994|3|1|Quoted as NET pricing|Y
01|75994|3|2|This item is Non-ReturnableNon-Cancelable|Y
01|76000|2|1|Qty Break Pricing|Y
01|76003|1|1|A555-2541 Screw for Okuma L370 OKL3-ER32X|Y
01|76005|1|1|3 PCS AVAILABLE|Y
01|76005|2|1|2 PCS AVAILABLE|Y
01|76005|3|1|12 PCS AVAILABLE|Y
01|76005|4|1|8 PCS AVAILABLE|Y
01|76005|6|1|35 PCS AVAILABLE|Y
01|76005|7|1|7 PCS AVAILABLE|Y
01|76005|8|1|3 PCS AVAILABLE|Y
01|76005|9|1|16 PCS AVAILABLE|Y
01|76005|10|1|1 PC AVAILABLE|Y
01|76005|11|1|2 PCS AVAILABLE|Y
01|76019|1|1|Core trade-in quoted for un-repairable tool sent in on|Y
01|76019|1|2|RGA# LVR-49980. MNL12-ER40Z s/n: A0232|Y
01|76024|1|1|S62SF-4-4.00-3|Y
01|76024|2|1|S62SF-6-4.00-3|Y
01|76025|1|1|Includes: 5AX201WAA21 table with motors cables|Y
01|76025|1|2|control boxes pendants M-code cable and power cable.|Y
01|76039|1|1|Unit is unrepairable.  Collet cannot be removed even|Y
01|76039|1|2|after the the retaining sleeve was cut off.|Y
01|76039|1|3|Reference RGA# TOR-50115|Y
01|76040|1|1|Table cables booster included|Y
01|76040|3|1|Free $1K Tooling Certificate good for list price tool|Y
01|76040|3|2|holders.|Y
01|76042|1|1|Net price quoted|Y
01|76044|1|1|Quoted as NET pricing|Y
01|76044|1|2|Non-Returnable Non-Cancelable|Y
01|76047|3|1|Installation includes: Drive unit short bar fiber|Y
01|76047|3|2|optic cables communications cable bulkhead cables|Y
01|76047|3|3|external cables parameter changes service time and|Y
01|76047|3|4|travel.|Y
01|76053|4|1|INCLUDED AT NO CHARGE|Y
01|76053|5|1|INCLUDED AT NO CHARGE|Y
01|76053|6|1|SUPPORT TABLE WITH BEARING/NO BRAKE|Y
01|76053|10|1|INSTALLATION INCLUDES DRIVE FIBRE OPTICSINTERNAL|Y
01|76053|10|2|CABLES CONNECTOR TRAVEL TRAINING LABOR|Y
01|76072|1|1|Ref: RGA# TOR-50124|Y
01|76072|1|2|CAT40-UMT200UH Stylus broken off.|Y
01|76074|1|1|Ref: RGA#TAR-50138|Y
01|76074|1|2|NSV300FA-M 1 DG Sending table in for rebuild.|Y
01|76074|36|1|Grooves on part of blake system from face seal. This|Y
01|76074|36|2|must be plated and regrounded.|Y
01|76077|1|1|1 Table with Sheet Metal and Center Divider|Y
01|76104|1|1|Ref: RGA# TAR-50119|Y
01|76104|1|2|CNCZ202LFA Excessive backlash and send in for|Y
01|76104|1|3|evaluation.|Y
01|76123|1|1|NET PRICING|Y
01|76123|1|2|Non-returnable Non-cancelable|Y
01|76124|2|1|Jet Slot Modification of C5036-0500-8.00|Y
01|76125|2|1|THIS TABLE HAS HYD. BRAKE CLAMPING/ WILL NEED HYD UNIT|Y
01|76125|7|1|HYDRAULIC UNIT FOR BRAKE SYSTEM ON ROTARY AND TILT AXIS|Y
01|76125|20|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|76125|20|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|76125|20|3|THIS COST DOES NOT INCLUDE ADDITIONAL AXIS PARAMETERS|Y
01|76125|20|4|THAT FANUC NEEDS TO INSTALL|Y
01|76125|20|5|NO CUSTOMER CABLE MANAGEMENT INCLUDED|Y
01|76126|20|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|76126|20|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|76126|20|3|THIS COST DOES NOT INCLUDE ADDITIONAL AXIS PARAMETERS|Y
01|76126|20|4|THAT FANUC NEEDS TO INSTALL|Y
01|76126|20|5|NO CUSTOMER CABLE MANAGEMENT INCLUDED|Y
01|76175|1|1|1 PC STOCK Balance ETA Pending|Y
01|76208|1|1|Ref: RGA#TAR-50075|Y
01|76208|1|2|5AX-400FA SN#Not legible send in for evaluation.|Y
01|76208|54|1|KS-AX400R-FA4TB Motorcover for tilting axis|Y
01|76208|55|1|AX401R063 Retainer for tubular roller|Y
01|76208|56|1|AX401R063 Retainer for tubular roller|Y
01|76208|57|1|GR-AX401R028 Worm screw gear|Y
01|76208|58|1|AX401R051 Seal for side cover (R-ax)|Y
01|76208|59|1|KS-AX400R-FA2R Motorcover for rotary axis|Y
01|76208|60|1|KS-AX400R-FA3T Scale cover for tilting axis|Y
01|76208|64|1|TCE-57032 Directmount power cable for tilting|Y
01|76208|65|1|TCE-92524 Directmount feedback cable for tilting axis|Y
01|76208|66|1|TCE-57031 Directmount power cable for rotary axis|Y
01|76208|67|1|TCE-92523 Directmount feedback cable for rotary axis|Y
01|76212|1|1|Special Slitting Saw RAH Customer to specify Taper and|Y
01|76212|1|2|Style|Y
01|76212|3|1|Special Slitting Saw RAH Customer to specify Taper and|Y
01|76212|3|2|Style.|Y
01|76214|1|1|NBT30-SK20-60P-J Taper Plus BT30 SK20 60mm GL w/Hi-Spd|Y
01|76214|1|2|Coolant Nuts installed prior to shipping.|Y
01|76214|4|1|NBT30-C20-65G Taper Plus BT30 C20 Milling Chuck 65mm GL|Y
01|76214|4|2|w/Hi-Speed Nuts installed prior to shipping|Y
01|76215|1|1|NBT30-SK10C-120P-J MUST HAVE COOLANT NUTS INSTALLED|Y
01|76215|1|2|PRIOR TO SHIPPING.|Y
01|76215|1|3|Price reflects YOUR NET COST with Coolant Nuts installd|Y
01|76217|1|1|NBT30-MDSCA25.4S-60S|Y
01|76217|1|2|Special Order. Unit Price Each.|Y
01|76218|1|1|BT30-SKO10-135 w/Enshu Positioning Pin|Y
01|76218|1|2|Special Order. Unit Price Each.|Y
01|76219|1|1|>>>NET PRICE<<<|Y
01|76219|1|2|SPECIAL PRICE FOR INTERMAQ|Y
01|76222|3|1|NBT40-HC0500-3.55|Y
01|76222|3|2|2Lock TaperPlus NBT40 Hydraulic Chuck 1/2 X 3.55 Gage|Y
01|76222|3|3|Please note this is considered Special once a|Y
01|76222|3|4|purchase order is place it cannot be cancelled or|Y
01|76222|3|5|returned.|Y
01|76222|8|1|KM1/2-5/16 Straight Collet|Y
01|76222|8|2|Please note: This collet is Special once a purchase|Y
01|76222|8|3|order is placed it cannot be cancelled or returned.|Y
01|76234|3|1|Includes: drive amp bulk head cable set external|Y
01|76234|3|2|cable set fiber optic cable communication cable|Y
01|76234|3|3|travel and labor for installation.|Y
01|76268|1|1|1x5AX-350FA-R-36|Y
01|76268|1|2|Ref: TAR-50140 A-axis locked up.|Y
01|76268|38|1|Freight charges:from Celina to Lyndex.|Y
01|76268|38|2|Celina is responsible for all freight charges.|Y
01|76271|1|1|KM32-7.9|Y
01|76271|1|2|KM32 7.9mm straight collet|Y
01|76281|23|1|Pull Stud Attachment for Torque Wrench|Y
01|76284|1|1|Quoted as NET pricing|Y
01|76284|2|1|Non-returnable Non-Cancelable|Y
01|76284|2|2|Quoted as NET pricing|Y
01|76284|3|1|Non-Returnable Non-cancelable|Y
01|76284|3|2|quoted as NET pricing|Y
01|76284|4|1|Non-Returnable Non-Cancelable|Y
01|76284|4|2|Quoted as NET pricing|Y
01|76284|5|1|Non-returnable Non-cancelable|Y
01|76284|5|2|Quoted as NET pricing|Y
01|76287|1|1|CAT40-SK10-90U-IDU-J coolant nut to be installed|Y
01|76287|1|2|prior to shipping from LN.Price includes coolant nuts|Y
01|76287|1|3|to be installed|Y
01|76287|2|1|Nuts to be installed at LN prior to shipping and|Y
01|76287|2|2|holder price includes the nut swap|Y
01|76296|12|1|If using coolant we can plug DIN holes|Y
01|76298|1|1|For Makino PS-95 Spec|Y
01|76298|1|2|A06B-0225-B000 Alpha 4/4000HVi Motor|Y
01|76298|1|3|DC24 Off Clamp|Y
01|76298|1|4|Reference Table CNC260FA-M S/N 8401C|Y
01|76298|5|1|70MM Riser for TAT-105 Tailstock|Y
01|76299|6|1|Installation of any 1 above rotary tables|Y
01|76299|6|2|Includes:  Interface Cables Hardware Travel/Labor|Y
01|76299|6|3|Note:  DDR Drive must be present|Y
01|76303|21|1|Nikken Drill chuck is 0 to 1/2.|Y
01|76304|3|1|Systen 3R Macro chuck 3R-SP26771-RS with adapter.|Y
01|76307|5|1|External Cables for 5AX-130FA-M - Tilt and Rotary|Y
01|76315|1|1|Twin spindle rotary table with Haas motors and cables|Y
01|76318|3|1|NET PRICING|Y
01|76318|3|2|INCLUDES ALL DRIVES CABLES CENTER DIVIDER ETC|Y
01|76328|3|1|Installation inlcudes: Drive unit short bar fiber|Y
01|76328|3|2|optic cable communications cable bulkhead cables|Y
01|76328|3|3|external cables parmeter changes service time and|Y
01|76328|3|4|travel.|Y
01|76332|2|1|Installation: Dual axis drive unit short bar fiber|Y
01|76332|2|2|optic cable communications cables bulkhead cables|Y
01|76332|2|3|external cables parameter changes service time and|Y
01|76332|2|4|travel.|Y
01|76354|1|1|BMT55-ER25-AD-ICE|Y
01|76354|1|2|BMT55 ER25 Adjustable Live Tool Int/Ext Coolant|Y
01|76354|1|3|Max 6500 RPM 25Nm|Y
01|76354|1|4|Price Based on 1pc|Y
01|76354|3|1|BMT55-ER25-AD-ICE|Y
01|76354|3|2|BMT55 ER25 Adjustable Live Tool Int/Ext Coolant|Y
01|76354|3|3|Max 6500 RPM 25Nm|Y
01|76354|3|4|Price Based on 2pcs|Y
01|76354|5|1|BMT55-ER25-AD-ICE|Y
01|76354|5|2|BMT55 ER25 Adjustable Live Tool Int/Ext Coolant|Y
01|76354|5|3|Max 6500 RPM 25Nm|Y
01|76354|5|4|Price Based on 5pcs|Y
01|76364|1|1|BT30-TB40-275 w/ PS-17|Y
01|76364|1|2|Special Order. Unit Price Each.|Y
01|76370|2|1|MCAT40-SK10C-150U-TCRP|Y
01|76394|1|1|Item is due to ship around 7/17/2017|Y
01|76394|2|1|Dimension B from attached drawing must be identified|Y
01|76417|2|1|ADD|Y
01|76417|6|1|se necesita informaciopn adicional modelo de maquina|Y
01|76417|6|2|y modelo del control.|Y
01|76418|1|1|Se requiere informacion del modelo de maquina y control|Y
01|76418|1|2|Puede trabajar horizonal/vertical|Y
01|76418|1|3|Angle Plate no incluido.|Y
01|76418|2|1|Incluye electronica y mano de obra @ Monterrey|Y
01|76436|1|1|w/ Fanuc Alpha2i motor|Y
01|76436|2|1|CNC-EXT-CABLE-R-ST|Y
01|76436|2|2|Cable set up to 10ft|Y
01|76436|3|1|TCD-043045/ 5C-THREAD-NOSE|Y
01|76436|3|2|Hyd Pancake Cylinder 5C Chuck (Per Spindle)|Y
01|76436|4|1|CNC Service|Y
01|76436|4|2|Min manifold & setup|Y
01|76436|5|1|Machine must have 5th axis control & option parameter|Y
01|76436|5|2|on prior to installation.|Y
01|76436|5|3|Price not including|Y
01|76439|6|1|Alternative for SC38X50X8|Y
01|76439|8|1|Each set includes 2x 12b & 1x 12c|Y
01|76439|9|1|Alternative for N-25|Y
01|76439|10|1|Alternative for N-42|Y
01|76463|3|1|*Installation Kit per Table Includes:|Y
01|76463|3|2|Drive Unit Ext Cables Short Bar Fiber Optics Cable|Y
01|76463|3|3|Communication Cable|Y
01|76466|3|1|If your customer does not have the proper wrench they|Y
01|76466|3|2|will need to order one.It is the same for either part|Y
01|76492|10|1|Need order by July 5th to get this Air Shipped from|Y
01|76492|10|2|Factory otherwise will be shipped by boat.|Y
01|76492|12|1|ETA aprox 07/25/2017|Y
01|76531|1|1|Note: Required delivery is 1st quarter of 2018.|Y
01|76531|2|1|Required delivery is 2nd quarter of 2018.|Y
01|76553|1|1|1xC4005-0875-6.66  Sent in for evaluation and repair.|Y
01|76553|1|2|RGA# TOR-50153|Y
01|76553|16|1|Due to the siginificant damage on original holder we|Y
01|76553|16|2|recommend purchasing new holder.|Y
01|76559|1|1|C4006-0750-3.00-CP to be modified w/ Coolant Ports|Y
01|76559|2|1|Modification of above End Mill holder w/ Coolant Ports.|Y
01|76567|1|1|Demo Table slighty used for several test cuts.|Y
01|76569|1|1|Ref: RGA# TOR-50052|Y
01|76569|1|2|1xHP-6 Indicator is sticking.|Y
01|76569|3|1|Optional|Y
01|76573|2|1|QUOTED AS NET PRICING|Y
01|76579|1|1|Quoted as NET pricing Non-returnable Non-Cancelable|Y
01|76579|2|1|Quoted as NET Pricing Non-returnable Non-cancelable|Y
01|76580|6|1|16PCS STOCK BALANCE ETA PENDING|Y
01|76580|8|1|18PCS STOCK BALANCE ETA 8-02-17|Y
01|76580|11|1|NO STOCK ETA PENDING|Y
01|76580|12|1|NO STOCK ETA PENDING|Y
01|76595|1|1|Ref: RGA# TAR-49859|Y
01|76595|1|2|CNC 100-3W-120LA  SN# 1045E|Y
01|76595|1|3|Indexing repeatability issue.|Y
01|76595|31|1|Part#D1010J003 Cylinder Flange|Y
01|76595|32|1|Part# M4121RRJ203030518 Rotary Joint|Y
01|76595|36|1|Motor Cover|Y
01|76596|6|1|NO STOCK ETA 09-26-17|Y
01|76596|9|1|8PCS STOCK BALANCE ETA PENDING|Y
01|76619|1|1|N3001-1250-1.44|Y
01|76635|2|1|NO STOCK ETA 2 DAY LEAD TIME|Y
01|76647|1|1|Installed w/ PS-123-AIR|Y
01|76647|2|1|Installed on NC5-46-SK10C-75 at factory|Y
01|76647|3|1|Installed w/ PS-123-AIR|Y
01|76647|4|1|Installed on NC5-46-C12-55 at factory|Y
01|76647|5|1|Installed w/ PS-123-AIR|Y
01|76647|6|1|Installed on NC5-46-C16-70 at factory|Y
01|76649|1|1|C1TA140 O-3442|Y
01|76658|1|2|Se necesita informacion de la maquina y control|Y
01|76658|2|2|Incluye electronica y mano de obra @ Monterrey|Y
01|76660|1|1|Se necesita informacion modelo de maquina y control|Y
01|76660|2|1|Incluye electronica y mano de obra|Y
01|76672|18|1|ETA 8/15|Y
01|76725|1|1|NO STOCK BALANCE ETA 07-31-17|Y
01|76752|26|1|3 Stk/10 3 wks/3 pending|Y
01|76757|2|1|External Cable Set|Y
01|76769|1|1|Repair of customer's T32118 SN#A0080|Y
01|76769|1|2|Ref: RGA# LVR-50187|Y
01|76769|2|1|Bearings Seals O-rings Minor parts Collet Nuts must|Y
01|76769|2|2|be replaced. Labor is include.|Y
01|76770|1|1|Service call for 5AX-200II SN#2255|Y
01|76770|1|2|Alarm on Rotary Axis|Y
01|76797|1|1|1xPF-2|Y
01|76797|1|2|Ref:RGA#TOR-50220|Y
01|76797|1|3|Crashed tool and sent in for evaluation.|Y
01|76802|4|1|w/PS-N46AE|Y
01|76802|5|1|w/PS-N46AE|Y
01|76805|1|1|HSK50A-HC32-125 HSK50A 32mm Hydraulic Chuck 125mm G/L|Y
01|76811|5|1|Special Angle Head # WK-ZW9-BBT50-ER50-I|Y
01|76811|5|2|Special Order. Unit Price Each.|Y
01|76811|7|1|Special Angle Head # WK-ZW9-BBT50-ER50-I|Y
01|76811|7|2|Special Order. Unit Price Each.|Y
01|76811|9|1|Special Angle Head # WK-ZW9-BBT50-ER50-I|Y
01|76811|9|2|Special Order. Unit Price Each.|Y
01|76811|11|1|Special Angle Head # WK-ZW9-BBT50-ER50-I|Y
01|76811|11|2|Special Order. Unit Price Each.|Y
01|76819|1|1|MNL12-ER11(X)-SUB-SP SN# 81008 02|Y
01|76819|1|2|Ref: RGA# QUA-49877|Y
01|76819|2|2|Spindle and all gears must be replaced.|Y
01|76819|2|3|All bearings seals & o-rings must be replaced.|Y
01|76821|1|1|1x MNL12-ER11(X)-SUB-SP SN# NA|Y
01|76821|1|2|Ref:RGA#LVR-50017|Y
01|76821|2|2|Spindle and all gears must be replaced.|Y
01|76821|2|3|All bearings seals and o-rings must be replaced.|Y
01|76823|1|1|1x C50RAM-MI40-180IC-80FP SN#37095-01|Y
01|76823|1|2|Ref:RGA#CUR-49969|Y
01|76823|2|1|All bearings seals and o-rings must be replaced.|Y
01|76823|2|2|Coolant bushings must be replaced.|Y
01|76823|2|3|MI40 spindle assembly must be replaced.|Y
01|76823|4|1|Repairing the C40RAM unit and converting to ER25|Y
01|76823|4|2|spindle.|Y
01|76823|4|3|Delivery will be 5-6 Weeks|Y
01|76837|1|1|5AX-201YA-AB s/n: 5534 Table was crashed.|Y
01|76837|1|2|RGA# TAR-50177|Y
01|76837|4|1|Motor is refurbished.|Y
01|76837|7|1|Expedite fee to complete repair within 1-2 business|Y
01|76837|7|2|days.|Y
01|76837|7|3|Normal expedite fee for 5AX-201 table is $1500.00.|Y
01|76861|1|1|NO STOCK CURRENTLY 35PCS WILL BE AVAILABLE 08-21-17|N
01|76861|1|2|BALANCE ETA PENDING|N
01|76861|2|1|56PCS WILL BE AVAILABLE 07-20-17|N
01|76861|2|2|BALANCE ETA PENDING|N
01|76861|3|1|13PCS IN STOCK 90PCS @ VENDOR 2WK LEAD TIME|N
01|76861|3|2|BALANCE ETA PENDING|N
01|76861|5|1|10PCS IN STK BALANCE ETA 2-3 WEEKS|N
01|76861|7|1|42 pcs ETA 1-2 Weeks|N
01|76861|8|1|18pc ETA 1-2 Weeks|N
01|76861|9|1|49 pcs ETA 1-2 Weeks|N
01|76861|10|1|12PCS IN STOCK BALANCE ETA PENDING|N
01|76861|15|1|NO STOCK BALANCE ETA 2-3 WKS|N
01|76884|5|1|SPECIAL #3 PROMO - $5 RETENTION KNOBS|N
01|76897|1|1|Quoted as NET pricing|Y
01|76897|1|2|Non-returnable Non-cancelable|Y
01|76898|1|1|NEED TO CONFIRM CONTROL OF OKUMA MACHINE|Y
01|76898|1|2|SPECIAL PRICING|Y
01|76898|1|3|CONFIRM EXTERNAL CABLES ARE NEEDED|Y
01|76898|5|1|LYNDEX NIKKEN TOOL CERTIFICATE $ 1000 VALUE  NO CHARGE|Y
01|76900|8|1|Baker's Dozen Promotion plus wrench @ no charge|Y
01|76911|1|1|Phillips to supply motor and cable|Y
01|76911|1|2|this table reflects proper hand per customer sketch|Y
01|76934|4|1|INCLUDED AT NO CHARGE|Y
01|76934|5|1|INCLUDED AT NO CHARGE|Y
01|76934|7|1|GOOD FOR PROTO TRAK AND QUASAR MACHINE|Y
01|76941|3|1|Table requires 500psi for the brake system.|Y
01|76941|5|1|50 Taper center socket with draw bar and cylinder|Y
01|76946|2|1|2-port flat plate rotary union.|Y
01|76955|16|1|*can be used for non-coolant or coolant along flute|Y
01|76955|16|2|application*|Y
01|76955|17|1|*Ret Knob Promo - $5.00net each|Y
01|76955|17|2|One retention knob per matching quantity tool holder|Y
01|76955|17|3|If all 52 CAT40 holders are order you can receive a|Y
01|76955|17|4|total of 52 ret knobs at special pricing.|Y
01|76955|21|1|*$5.00 Ret Knob Promo|Y
01|76959|2|1|Pricing noted is at NET|Y
01|76971|1|1|2PCS IN STOCK|Y
01|76977|1|1|Repair of customer's OKV1-ER50Z|Y
01|76977|1|2|Ref# LVR-50156|Y
01|76977|2|1|Collet nut Bearings & sealsmust be repalced.|Y
01|76977|2|2|Collet nut is crashed. Spindle shaft have a damage|Y
01|76977|2|3|need to replace.|Y
01|76979|2|1|1PC IN STOCK BALANCE ETA 2-3 WEEKS|Y
01|76979|3|1|4PCS IN STOCK BALANCE ETA 3-5 DAYS|Y
01|76983|1|1|***Core Buyback Pricing***|Y
01|76983|1|2|Ref. Okuma part# OK101-13000|Y
01|76988|1|1|ETA 6-7wks ARO|Y
01|76988|1|2|Air shipment available at additional cost|Y
01|76999|3|1|2-3 WEEK LEAD TIME- ALTER. FOR S75SF-6-6.00-3|Y
01|77002|4|1|Modify to C5006-0437-2.50-JS of above holder.|Y
01|77005|3|1|Includes: drive amp bulk head cable set external|Y
01|77005|3|2|cable set fiber optic cable communication cable|Y
01|77005|3|3|travel and labor for installation.|Y
01|77005|3|4|BASED UP PERFORMING ALL 3 INSTALLATION AT SAME TIME|Y
01|77009|2|1|Please note: This is not compatable with Mazak Machine|Y
01|77010|2|1|We do not offer a 3/32 in ER32 however we carry a 3mm|Y
01|77010|2|2|which will hold a 3/32.|Y
01|77023|1|1|This is for internal coolant or for dry use|Y
01|77025|1|1|Net price quoted.|Y
01|77029|3|1|Machine: OKK|Y
01|77029|3|2|Model:   PG-8    Serial No.:|Y
01|77029|3|3|Control:|Y
01|77029|3|4|Installation includes all parts and labor to setup|Y
01|77029|3|5|table on machine. Includes 1/2 day onsite|Y
01|77029|3|6|technician.|Y
01|77029|3|7|***Important*** Control must have 4th axis ladder|Y
01|77029|3|8|logic installed prior to table setup.|Y
01|77044|18|1|Special Promo Price|Y
01|77046|1|1|CAT40 45 Deg Fixed RAH Max 10K RPM 30Nm Tq 1:1 Gear|Y
01|77046|1|2|Ratio No Coolant Supply|Y
01|77051|1|1|Tool #2|Y
01|77051|2|1|Tool #2-A|Y
01|77051|3|1|Tool #3|Y
01|77051|4|1|Tool #3|Y
01|77051|5|1|Tool #4|Y
01|77051|6|1|Tool #4|Y
01|77083|3|1|Setting Fixture for MNL12-SK20X-ICE|Y
01|77100|1|1|CNCZ202LSA-BR High Speed Rotary Table 200mm Left Yasnac|Y
01|77100|1|2|For Brother TC-S2DN|Y
01|77103|7|1|NK103-7H000 Nakamura Right Angle Speed Increaser|Y
01|77103|8|1|NK103-7G000 Nakamura Straight Speed Increaser|Y
01|77103|20|1|BMT55-ER25-AD-ICE   BMT55 ER25 Adjustable Live Tool|Y
01|77103|20|2|Internal/External Coolant Max 6500 RPM 25Nm|Y
01|77113|2|1|*can be used for non-coolant or|Y
01|77113|2|2|coolant along the flutes application|Y
01|77114|1|1|Special Order. Unit Price Each.|Y
01|77114|2|1|Pull Stud PS-123-AIR included with NC5-46-FS16-37-60S|Y
01|77131|1|1|C4006-0750-3.00-CP Modified to Cooplant Port type|Y
01|77131|2|1|Coolant Port modification of above holder|Y
01|77132|1|1|AC6-MAS-220  CAPTO6 TESTBAR|Y
01|77134|8|1|HSK40A Shrink Fit Holder 4mm|Y
01|77134|9|1|HA010.040.06.080 HSK40A Shrink Fit Holder 6mm|Y
01|77134|10|1|HA010.040.08.080 HSK40A Shrink Fit Holder 8mm|Y
01|77134|11|1|HSK40A Shrink Fit Holder 12mm|Y
01|77138|1|1|Non-Standard Special order item that is not returnable|Y
01|77138|1|2|Order cannot be canceled once placed|Y
01|77147|2|1|NET PRICE|Y
01|77147|2|2|Lyndex-Nikken can make the position block upon receipt|Y
01|77147|2|3|of machine spindle information|Y
01|77168|1|1|Warranty repair of 5AX-201OSP3 s/n: 3652|Y
01|77168|1|2|Customer purchased extended warranty.|Y
01|77168|11|1|Warranty repair/upgrade of 5AX-201OSP3 s/n: 3652|Y
01|77168|11|2|Reference RGA# MOD-50189|Y
01|77169|3|1|Installation includes: Drive unit short bar fiber|Y
01|77169|3|2|optic cable communications cables bulkhead cables|Y
01|77169|3|3|external cables parameter changes service time and|Y
01|77169|3|4|travel.|Y
01|77169|6|1|$1000.00 free tooling promo.|Y
01|77174|4|1|Installation includes: Drive unit short bar fiber|Y
01|77174|4|2|optic cable communications cable bulkhead cables|Y
01|77174|4|3|external cables parameter changes service time and|Y
01|77174|4|4|travel.|Y
01|77190|1|1|5AX-2MT-105-120BAYA-BR s/n: 8240 Table was crashed.|Y
01|77190|1|2|Reference RGA# TAR-50219|Y
01|77192|1|1|Repair of MZQT47-ER25X-OFF-HS  SN#39355 01|Y
01|77192|1|2|35933 01 35933 02 20097 01|Y
01|77192|1|3|Ref:RGA# LVR-50204 sending for evaluation.|Y
01|77192|2|1|Recondition input and ER25 spindles.|Y
01|77192|2|2|All bearings seals o-rings must be replaced.|Y
01|77192|2|3|Labor is included.|Y
01|77214|5|1|ETA aprox 8/22/2017.|Y
01|77215|1|1|42 in stock|Y
01|77215|1|2|bal ETA 8/15|Y
01|77215|2|1|49 in stock|Y
01|77215|2|2|balance ETA 7/19|Y
01|77215|3|1|16 in stock|Y
01|77215|3|2|balance ETA 8/2|Y
01|77215|4|1|33 in stock|Y
01|77215|4|2|balance ETA (60) 7/19|Y
01|77215|4|3|balance ETA (7)  8/2|Y
01|77216|2|1|If required|Y
01|77216|3|1|If required|Y
01|77223|1|1|HFO TAMPA TO SUPPLY MOTOR AND CABLES|Y
01|77223|1|2|TABLE AND TAILSTOCK IN STOCK|Y
01|77223|5|1|HFO TO SUPPLY MOTOR AND CABLES|Y
01|77223|7|1|INCLUDED MATCHING TAILSTOCK FOR CNC-180-2W|Y
01|77248|1|1|HSK63A taper with ER16 output.External coolant with a|Y
01|77248|1|2|machine specific positioning pin/flange assembly.|Y
01|77248|3|1|HSK63A taper with ER16 output.External coolant with a|Y
01|77248|3|2|machine specific positioning pin/flange assembly.|Y
01|77293|1|1|NO STOCK CURRENTLY 35PCS WILL BE AVAILABLE 08-21-17|N
01|77293|1|2|BALANCE ETA PENDING|N
01|77293|2|1|56PCS WILL BE AVAILABLE 07-20-17|N
01|77293|2|2|BALANCE ETA PENDING|N
01|77293|3|1|13PCS IN STOCK 90PCS @ VENDOR 2WK LEAD TIME|N
01|77293|3|2|BALANCE ETA PENDING|N
01|77293|5|1|10PCS IN STK BALANCE ETA 2-3 WEEKS|N
01|77293|7|1|42 pcs ETA 1-2 Weeks|N
01|77293|8|1|18pc ETA 1-2 Weeks|N
01|77293|9|1|49 pcs ETA 1-2 Weeks|N
01|77293|10|1|12PCS IN STOCK BALANCE ETA PENDING|N
01|77293|15|1|NO STOCK BALANCE ETA 2-3 WKS|N
01|77295|2|1|AIR BRAKE SYSTEM|Y
01|77295|2|2|EXTERNAL CABLES INCLUDED|Y
01|77295|2|3|SPECIAL LIST PRICE|Y
01|77295|4|1|AIR/HYDRAULIC BOOSTER FOR BRAKE|Y
01|77295|4|2|EXTERNAL CABLES INCLUDED|Y
01|77295|4|3|SPECIAL LIST PRICE|Y
01|77295|8|1|LYNDEX NIKKEN TOOL CERTIFICATE  2000 VALUE NO CHARGE|Y
01|77295|8|2|THIS OFFER IF 5 AXIS TABLE IS PURCHASED|Y
01|77311|1|1|TABLE SET UP SAME AS EXISTING NIKKEN 5AX-130MA-M|Y
01|77311|1|2|HA33NC-TS MOTORS FOR BOTH AXIS. AC100V|Y
01|77311|1|3|REFERENCE PROJECT SERIAL #3116|Y
01|77311|1|4|LONGER MOTOR COVER FOR MA MOTOR NEEDED|Y
01|77311|1|5|CAN USE EXISTING MOTOR COVER TO REDUCE DELIVERY|Y
01|77311|1|6|DELIVERY BEING CHECKED AVAILABILITY OF CORRECT MOTOR|Y
01|77311|1|7|@@@@@@ WILL NEED TO CONFIRM ENCODER ON EXISTING TABLE|Y
01|77311|1|8|FACEPLATE SAME DIMENSIONS AS EXISTING TABLE|Y
01|77311|3|1|WILL HAVE 45 DEGREE CONNECTORS|Y
01|77316|1|1|MZQT5-ER32Z-HS-ICE|Y
01|77316|1|2|High Speed ER32 Z|Y
01|77316|2|1|MZQT5-ER32Z-HS-ICE|Y
01|77316|2|2|High Speed ER32 Z|Y
01|77316|4|1|MZQT5-ER40Z-HT-ICE|Y
01|77316|4|2|ER40Z High Torque|Y
01|77316|5|1|MZQT5-ER40Z-HT-ICE|Y
01|77316|5|2|ER40Z High Torque|Y
01|77332|1|1|VDI20 ER20/ER25/SK16 Str Live Tool INT Coolant|Y
01|77341|1|1|Please Note: This holder is non standard stock. Once|Y
01|77341|1|2|a purchase order is placed it cannot be cancelled or|Y
01|77341|1|3|returned.|Y
01|77343|1|1|HURCO TO ADVISE YASKAW MOTORS TO BE USED|Y
01|77343|1|2|HURCO TO DO INSTALLATION|Y
01|77343|1|3|EXTERNAL CABLES AND SERVO MOTORS QUOTED|Y
01|77343|1|4|OPTION SCALE FOR TILT AXIS QUOTED|Y
01|77343|7|1|SCALE FOR TILT AXIS|Y
01|77354|1|1|Live Tool for Fuji CSD300R Item# 190853 ER25 IC|Y
01|77354|1|2|Special Order. Unit Price Each.|Y
01|77354|2|1|Live Tool for Fuji CSD300R Item# 190853 ER25 IC|Y
01|77354|2|2|Special Order. Unit Price Each.|Y
01|77354|3|1|Live Tool for Fuji CSD300R Item# 190853 ER25 IC|Y
01|77354|3|2|Special Order. Unit Price Each.|Y
01|77354|5|1|Live Tool for Fuji CSD300R Item# 102771|Y
01|77354|5|2|Special Order. Unit Price Each.|Y
01|77354|6|1|Live Tool for Fuji CSD300R Item# 102771|Y
01|77354|6|2|Special Order. Unit Price Each.|Y
01|77354|7|1|Live Tool for Fuji CSD300R Item# 102771|Y
01|77354|7|2|Special Order. Unit Price Each.|Y
01|77354|9|1|Spanner Wrench ER25 40/42mm Mimatic Item# 107558|Y
01|77354|9|2|Special Order. Unit Price Each.|Y
01|77360|1|1|LT tool for Fuji TNW4500. Item#102771. ER32 IC|Y
01|77360|1|2|Special Order. Unit Price each|Y
01|77360|1|3|These items are considered specail and non-cancellable|Y
01|77360|2|1|ER32 collet nut spanner wrench item#112900|Y
01|77360|2|2|Special order. Unit price each|Y
01|77360|2|3|These items are considered special and non-camcellable|Y
01|77360|3|1|Spindle Wrench ER32. item#107642|Y
01|77360|3|2|Special order. unit price each|Y
01|77360|3|8|These items are considered special and non-cancellable|Y
01|77362|10|1|ETA 8/21|Y
01|77362|41|1|Quoted as Special NET pricing. ETA PENDING|Y
01|77373|1|1|ISO-20  ER16 Collet Chuck|Y
01|77380|1|1|Budget Quote for CNC401 S/N 13147 Service Call|Y
01|77380|2|1|Fixed expenses for travel from L/N to customer|Y
01|77380|2|2|Gas: $210 Round Trip|Y
01|77380|2|3|Travel Time: 6hrs x $100/hr|Y
01|77380|3|1|Break Down is for each day.|Y
01|77380|3|2|Hotel: $150/night|Y
01|77380|3|3|Meals: $50/day|Y
01|77380|3|4|Gas: $20/day|Y
01|77380|4|1|Parts have not been determined yet|Y
01|77380|4|2|** Repair of rotary table can vary **|Y
01|77380|4|3|Estimated cost:  $1000 - $7000 in parts|Y
01|77380|5|1|8 hrs Days x 3 Days|Y
01|77407|2|1|Coolant Port 4 Holes per Drawing.|Y
01|77411|1|1|Repair of customer's MNL12-ER11(X)-SUB-SP s/n: NA|Y
01|77411|1|2|Reference RGA# LVR-50227|Y
01|77411|2|1|Replace ER spindle and threadring. Recondition 1 input|Y
01|77411|2|2|spindle.  Also replace all bearings seals & o-rings.|Y
01|77411|2|3|Labor is included.|Y
01|77411|2|4|Gears seem to be in good condition.|Y
01|77442|2|1|Installation includes: Dual axis drvie unit short bar|Y
01|77442|2|2|fiber optic cables communications cables bulkhead|Y
01|77442|2|3|cables external cables parameter changes service|Y
01|77442|2|4|time and travel.|Y
01|77463|5|1|FULL 4TH AXIS INSTALLATION RO HARDING GX1600 W/FANUC|Y
01|77463|5|2|INCLUDES DRIVE FRIBRE OPTICS CONNECTORS LABOR|Y
01|77463|5|3|TRAVEL|Y
01|77464|2|1|Includes External cable set & interface.|Y
01|77479|1|1|Inspection fee for B40RAM-ER20-232ST-65TP s/n: 54295 01|Y
01|77479|1|2|Customer has declined repair and replacement unit.|Y
01|77479|1|3|Unit will be returned disassembled.|Y
01|77484|2|1|Installation kit including amplifier interface cables|Y
01|77484|2|2|external cables communications cable short bar fiber|Y
01|77484|2|3|optic cable|Y
01|77484|2|4|Note: Data sheets for the machine are necessary before|Y
01|77484|2|5|shipment|Y
01|77495|1|1|Note: Net price to end user is $257.00 posted on our|Y
01|77495|1|2|web site.|Y
01|77518|1|1|BT40-Special Right Anglehead w/ 3 pin Support PolyMill|Y
01|77518|1|2|P16-6 Tooling Interface External Coolant Max 6Nm Tq|Y
01|77518|1|3|1:1.67 Gear Ratio 7200 -> 12000rpm|Y
01|77518|1|4|1 piece Pricing shown|Y
01|77518|3|1|BT40-Special Right Anglehead w/ 3 pin Support PolyMill|Y
01|77518|3|2|P16-6 Tooling Interface External Coolant Max 6Nm Tq|Y
01|77518|3|3|1:1.67 Gear Ratio 7200 -> 12000rpm|Y
01|77518|3|4|2 piece Pricing shown|Y
01|77518|5|1|BT40-Special Right Anglehead w/ 3 pin Support PolyMill|Y
01|77518|5|2|P16-6 Tooling Interface External Coolant Max 6Nm Tq|Y
01|77518|5|3|1:1.67 Gear Ratio 7200 -> 12000rpm|Y
01|77518|5|4|4 piece Pricing shown|Y
01|77518|7|1|BT40-Special Right Anglehead w/ 3 pin Support PolyMill|Y
01|77518|7|2|P16-6 Tooling Interface External Coolant Max 6Nm Tq|Y
01|77518|7|3|1:1.67 Gear Ratio 7200 -> 12000rpm|Y
01|77518|7|4|6 piece Pricing shown|Y
01|77518|9|1|Special Cutting Milling Insert for above RAH|Y
01|77518|9|2|Price shown is 1pc pricing. 10pc MINIMUM REQUIRED|Y
01|77536|4|1|HSK40A SF Holder 3mm|Y
01|77536|5|1|HSK40A SF Holder 4mm|Y
01|77536|6|1|HA010.040.06.080 SF Holder 6mm|Y
01|77536|7|1|HA010.040.08.080 SF Holder 8mm|Y
01|77540|1|1|NCAT40-ZMAC32-150V Taper Plus CAT40 ZMAC Boring Holder|Y
01|77540|2|1|NCAT40-ZMAC42-150V Taper Plus CAT40 ZMAC Boring Holder|Y
01|77540|3|1|NCAT40-ZMAC55-165V Taper Plus CAT40 ZMAC Boring Holder|Y
01|77540|4|1|NCAT40-ZMAC70-165V Taper Plus CAT40 ZMAC Boring Holder|Y
01|77540|5|1|NCAT40-ZMAC85-195V Taper Plus CAT40 ZMAC Boring Holder|Y
01|77545|1|1|155417 Mimatic Hydraulic Chuck|Y
01|77545|2|1|119889 Mimatic Hydraulic Sleeve|Y
01|77545|3|1|152696  Mimatic Hydraulic Sleeve|Y
01|77568|2|1|2-3 WEEK LEAD TIME|Y
01|77579|1|1|5AX-350ZA-M para control Siemens.|Y
01|77579|1|2|Para efectos de proporcionar referencia en el precio.|Y
01|77579|1|3|Se requiere mas informacion especifica de la maquina|Y
01|77579|1|4|y el control para confirmar precio final.|Y
01|77579|2|1|Incluye toda la electronica cables y mano de obra|Y
01|77579|2|2|para instalar la mesa en planta del cliente (CDMX)|Y
01|77584|1|1|Quote for Service Call to be performed on|Y
01|77584|1|2|CNC202-2W-250FA s/n: 10911|Y
01|77584|1|3|Please note this is an estimate only any additional|Y
01|77584|1|4|expenses or labor charges will be added to the final|Y
01|77584|1|5|bill after the service call is completed.  Quote does|Y
01|77584|1|6|not include any parts that may need to be replaced.|Y
01|77584|1|7|Service Call dates: 7/26/17 - 7/28/17|Y
01|77584|2|1|Expenses include: Airfare car rental hotel meals|Y
01|77584|2|2|transit time gas and parking.|Y
01|77584|3|1|We are estimating 12 hours of labor for this service|Y
01|77584|3|2|call.|Y
01|77585|11|1|*Bushing to be installed in customer's position block|Y
01|77597|1|1|5AX-201FA s/n: 5073 Table was crashed and now has|Y
01|77597|1|2|a lot of backlash/slop when at zero.|Y
01|77597|1|3|Reference RGA# TAR-50192|Y
01|77601|2|1|2-3 WEEK LEAD TIME|Y
01|77601|15|1|2PCS IN STOCK BALANCE ETA 8-10 WEEKS|Y
01|77601|29|1|12-14 WEEK LEAD TIME|Y
01|77602|6|1|Nakamura Live X-axis Str ER40 <CROSS> ICE|Y
01|77602|7|1|Nakamura Live Z-axis 90Deg ER40 <STRAIGHT> ICE|Y
01|77606|1|1|NMTB40-C1-105|Y
01|77606|2|1|NMTB40-C1-105|Y
01|77606|2|2|NMTB40 Taper 1 dia. w 105mm G.L.|Y
01|77607|1|1|Non-returnable Non-cancelable|Y
01|77607|1|2|One time test cut|Y
01|77612|5|1|Modification Pricing includes ID Chip Hole|Y
01|77612|5|2|Installing the chip and re-balancing the holders.|Y
01|77617|1|1|57PCS IN STOCK|Y
01|77617|2|1|43PCS IN STOCK|Y
01|77617|3|1|57PCS IN STOCK|Y
01|77617|4|1|51PCS IN STOCK|Y
01|77617|5|1|38PCS IN STOCK|Y
01|77617|6|1|1PC IN STOCK 15PCS COMING IN 08-05-17|Y
01|77617|7|1|11PCS IN STOCK|Y
01|77617|8|1|12PCS IN STOCK|Y
01|77617|9|1|382PCS IN STOCK]|Y
01|77617|10|1|40PCS IN STOCK|Y
01|77617|11|1|118PCS IN STOCK|Y
01|77617|12|1|2206PCS IN STOCK|Y
01|77617|13|1|2458PCS IN STOCK|Y
01|77617|14|1|69PCS IN STOCK|Y
01|77617|15|1|92PCS IN STOCK|Y
01|77617|16|1|381PCS IN STOCK|Y
01|77617|17|1|2PCS IN STOCK|Y
01|77617|18|1|NO STOCK ETA 5-7 WEEK LEAD TIME|Y
01|77617|19|1|158PCS IN STOCK|Y
01|77617|20|1|21PCS IN STOCK|Y
01|77617|21|1|38PCS IN STOCK|Y
01|77617|22|1|9PCS IN STOCK|Y
01|77631|2|1|Installation includes: Drive unit short bar fiber|Y
01|77631|2|2|optic cable communications cable bulkhead cables|Y
01|77631|2|3|external cables paramter changes service time and|Y
01|77631|2|4|travel.|Y
01|77636|1|1|NO STOCK BALANCE ETA 1 WEEK|Y
01|77637|2|1|NT50 Taper Center Socket|Y
01|77637|3|1|Hydraulic Cylinder and Adapter for NT50 Taper Socket|Y
01|77637|4|1|RCN 8380 +/- 2 Big Bore Scale with mounting kit|Y
01|77637|5|1|5 Riser Plate for CNC321LZA-M table|Y
01|77637|7|1|Power & Signal/ Feedback Cable set|Y
01|77637|9|1|5 Riser for H-230S Hydraulic Tailstock|Y
01|77647|1|1|KM32-7.9|Y
01|77647|1|2|KM32 7.9mm straight collet|Y
01|77648|2|1|*PRICE FOR 5-8 PCS|Y
01|77648|3|1|*PRICE FOR 10 or more PCS|Y
01|77665|2|1|Dom Give me a call Monday so I can explain why I|Y
01|77665|2|2|added these to the quote.|Y
01|77665|2|3|Gage 2.50|Y
01|77667|1|1|Tooling Certificate Number: 5410-958-042617|Y
01|77683|1|1|Tooling Certificate Number: 13366-959-042417RT|Y
01|77686|2|1|MUST PURCHASE 4PCS IN ORDER TO GET THE QUANTITY DIS.|Y
01|77703|1|1|H023M10 #4 Draw Screw-Replacement Part|Y
01|77703|1|2|Quoted as NET pricing|Y
01|77703|1|3|Non-Returnable Non-Cancelable|Y
01|77703|2|1|H023M10#5 Retainer Replacement Part|Y
01|77703|2|2|Quoted as NET pricing|Y
01|77703|2|3|Non-returnable Non-cancelable|Y
01|77703|3|1|H023HM10#6 Spring Replacement Part|Y
01|77703|3|2|Quoted as NET pricing|Y
01|77703|3|3|Non-Returnable Non-cancelable|Y
01|77703|4|1|H023M10#7 Steel Ball Replacement Part|Y
01|77703|4|2|Quoted as NET pricing|Y
01|77703|4|3|Non-returnable Non-cancelable|Y
01|77751|1|1|STOCK IN JAPAN|Y
01|77760|1|1|A05.0311.7951.250(23926) Special Mimatic LT|Y
01|77760|2|1|A05.0311.7951.250(23926) Special Mimatic LT|Y
01|77760|2|2|Price for 2 or more units.|Y
01|77779|1|1|120 pcs stock/ 160 pcs 10 wks|Y
01|77793|1|1|Repair of customer's C40RAM-ER-32-180TS-65TP SN#6529201|Y
01|77793|1|2|Ref: RGA# CUR-50268|Y
01|77793|2|1|ER32 spindle assembly must be repalced.|Y
01|77793|2|2|Bearings seals and o-rings must also be replaced.|Y
01|77793|2|3|Locating pin & adjustment bolts must be replaced.|Y
01|77793|2|4|Labor is included.|Y
01|77805|1|1|Special BT50 Taper Plus with ER50 Output|Y
01|77805|1|2|Special Torque Arm +3 Pin Support|Y
01|77805|1|3|External + Central Internal Coolant|Y
01|77805|1|4|Max 5000RPM 150N.m|Y
01|77805|1|5|Special Order Unit Price Each|Y
01|77805|2|1|Special BT50 Taper Plus with ER50 Output|Y
01|77805|2|2|Special Torque Arm +3 Pin Support|Y
01|77805|2|3|External + Central Internal Coolant|Y
01|77805|2|4|Max 5000RPM 150N.m|Y
01|77805|4|1|Big BT50 Taper ER50 Output|Y
01|77805|4|2|External Coolant with Support pins|Y
01|77805|4|3|Max 1200RPM 400N.m TQ|Y
01|77805|4|4|Special Order. Unit Price Each.|Y
01|77806|1|1|26 pieces stock. B/O 800-034  17/32 R8 Collet|Y
01|77810|1|1|Ref: RGA#TAR-50212|Y
01|77810|1|2|5AX-2MT-105-120FA SN#8034 Backlash in both axis.|Y
01|77824|1|1|2-3 WEEK LEAD TIME|Y
01|77824|2|1|2-3 WEEK LEAD TIME|Y
01|77831|1|1|Continous Duty Cycle 12000 RPM|Y
01|77847|4|1|2-3 WEEK LEAD TIME|Y
01|77852|1|1|H63A(80)-SF1000-3.375-ID|Y
01|77852|1|2|Non-returnableNon-cancelableQuoted as NET pricing|Y
01|77852|2|1|H63A(80)-SF0750-3.375-ID|Y
01|77852|2|2|Non-returnable Non-cancelable Quoted as NET pricing|Y
01|77852|3|1|CAT50-SF0500-3.375-ID|Y
01|77852|3|2|Non-returnable Non-cancelable Quoted as NET pricing|Y
01|77865|4|1|T05-016(S)x 2 pieces SLOTTED in stock|Y
01|77865|5|1|T05-024(S) x 1 piece SLOTTED in stock|Y
01|77868|1|1|Service call requested for 14 CNCZ180 rotary tables.|Y
01|77868|1|2|This is an estimate only final pricing would be|Y
01|77868|1|3|determined upon completion of the Service Call.|Y
01|77868|2|1|Airfare & Car Rental: $1500.00 for both Technicians.|Y
01|77868|2|2|Hotel: $1200.00 for both Technicians for 1 week.|Y
01|77868|3|1|Transit time Meals Gas & Parking|Y
01|77868|4|1|Quantity reflects 2 Technicians at 28hrs/each.|Y
01|77888|1|1|Quoted as NET pricing|Y
01|77888|2|1|Quoted as NET pricing|Y
01|77903|9|1|This is threading for the Draw NUT not tube*****|Y
01|77905|17|1|3.175 ranges between this size|Y
01|77905|23|1|5.75 falls in this range|Y
01|77905|36|1|*Mori Seiki machine|Y
01|77905|37|1|*Matsuura machine|Y
01|77911|9|1|HSK100A-HC0750-8.00|Y
01|77911|9|2|Special Hydraulic Chuck w 8.00 gage length|Y
01|77929|1|1|NO STOCK BALANCE ETA 08-06-17|Y
01|77964|1|1|Non-returnable non-cancelable|Y
01|77964|1|2|NET pricing|Y
01|77967|1|1|Position only configuation actuated by M-Code via|Y
01|77967|1|2|RS-232 cable.|Y
01|77987|3|1|Installation includes machine side components: drive|Y
01|77987|3|2|unit interface cables external cables short bar|Y
01|77987|3|3|fiber optic cable hydraulic hoses axis exspansion|Y
01|77987|3|4|card.|Y
01|77995|1|1|Quoted as NET pricing|Y
01|77995|1|2|Non-returnable Non-cancelable|Y
01|78057|1|1|CNC202FASN#7068A Table has lots of excessive backlash.|Y
01|78057|1|2|Ref: RGA# TAR-50215|Y
01|78062|1|1|1 pc ETA 2 weeksbalance 10-11 wks|Y
01|78062|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|78065|1|1|Missing collets ETA 2 days ARO. Please note that we|Y
01|78065|1|2|will open any set should you require any available size|Y
01|78065|1|3|immediately.|Y
01|78072|1|1|Replacement for un-repairable unit sent in for|Y
01|78072|1|2|evaluation on RGA# TOR-50276.|Y
01|78075|1|1|TOOLING CERTIFICATE NUMBER: 1195-1003-072617|Y
01|78079|2|1|150mm = 5.905 GL|Y
01|78079|4|1|NC5001-1000-4.00  1 Pilot 4 GL|Y
01|78079|5|1|NC5001-1000-8.00  1 Pilot 8 GL|Y
01|78079|6|1|NC5001-1000-10.00 1 Pilot 10 GL|Y
01|78094|1|1|balance ETA 14-16 WKS|Y
01|78094|2|1|balance ETA 14-16 WKS|Y
01|78111|1|1|This item is the closest replacement to item|Y
01|78111|1|2|#B40SF-0250-3.54B. This new item is not balanceable it|Y
01|78111|1|3|comes pre-balanced.|Y
01|78117|1|1|Includes:2-CNCZ180LSABR2 High Speed rotary tables with|Y
01|78117|1|2|sheet metal divider junction box with main cable set|Y
01|78117|1|3|drive units and internal cabinet cables.|Y
01|78121|1|1|Mimatic# 131597|Y
01|78121|2|1|Mimatic part# 124626|Y
01|78121|3|1|Mimatic part# 174863|Y
01|78123|1|1|Installation Assistance of CNCZ302FA-M|Y
01|78123|1|2|On Matsuura VX1000 with Fanuc 31i Control|Y
01|78145|4|1|INSTALLATION INCLUDES DRIVE CABLES EXTERNAL CABLES|Y
01|78145|4|2|TRAVEL AND LABOR INCLUDED|Y
01|78145|4|3|CONFIRMATION OF MACHINE LADDER NEEDED AND ADDITIONAL|Y
01|78145|4|4|AXIS NEEDED FROM FANUC ONCE CONFIRM ED BY MACHINE DATA|Y
01|78146|8|1|INSTALLATION INCLUDES DRIVE CABLES EXTERNAL CABLES|Y
01|78146|8|2|TRAVEL AND LABOR INCLUDED|Y
01|78146|8|3|CONFIRMATION OF MACHINE LADDER NEEDED AND ADDITIONAL|Y
01|78146|8|4|AXIS NEEDED FROM FANUC ONCE CONFIRM ED BY MACHINE DATA|Y
01|78146|10|1|FREE TOOL CERTIFICATE AT LIST PRICE|Y
01|78148|1|1|5AX-DD200BF2-4+2PRJ  5 Axis Direct Drive|Y
01|78148|1|2|Nikken Rotary Table With Rotary Joint|Y
01|78148|1|3|External Cables Included in Price.|Y
01|78148|1|4|Quoted as Net price|Y
01|78150|2|1|Special Positioning Block Quoted At Net Price.|Y
01|78165|1|1|Quoted at NET price.|Y
01|78174|1|1|Hot Deal Price NET price|Y
01|78174|2|1|Hot Deal NET price|Y
01|78197|3|1|Lyndex-Nikken to make upon receipt of spindle drawing|Y
01|78197|3|2|confirmation|Y
01|78197|3|3|**should you use NX4 on two machines it is best to|Y
01|78197|3|4|order a block for each machine|Y
01|78216|3|1|1MP-T2(TN90) is actual correct part number for inserts.|Y
01|78216|3|2|These are sold as set/10pcs only. Price is set cost.|Y
01|78218|16|1|Fanuc Robodrill Knobs|Y
01|78218|17|1|Fadal Knobs|Y
01|78219|16|1|Fanuc Robodrill Knobs|Y
01|78219|17|1|Fadal Knobs|Y
01|78224|17|1|Fanuc Robodrill Knobs|Y
01|78224|19|1|YCM NXV1020 Knobs|Y
01|78224|20|1|Fadal BT40 Knobs|Y
01|78226|1|1|Ref: RGA# TOR-50312|Y
01|78226|1|2|Repair of Tool#1: CAT40-NPU13-105U|Y
01|78226|3|1|Tool repair cost for Tool#1: $374.00 net|Y
01|78226|4|1|Reapir of Tool #2: CAT40-NPU13-105U|Y
01|78226|6|1|Tool repair cost for Tool#2 : $374.00 net|Y
01|78226|7|1|Reapir of Tool #4: CAT40-NPU13-105U|Y
01|78226|8|1|Option 1: Replacing only jaws.  Unit will still have|Y
01|78226|8|2|gritty feeling; however runout will be around .002.|Y
01|78226|8|3|Recommended option by technician.|Y
01|78226|9|1|Option 2: Replace drill chuck body will make the|Y
01|78226|9|2|gritty feeling go away and improve runout.|Y
01|78226|10|1|Repair total for option 1: $197.00 Net|Y
01|78226|10|2|Repair total for option 2: $374.00 Net|Y
01|78226|11|1|Reapir of Tool #5: CAT40-NPU13-105U|Y
01|78226|13|1|Tool repair cost for Tool#5 : $374.00 net|Y
01|78226|15|1|Recommend replacement for due to the repairing costs|Y
01|78226|15|2|are almost same as replacement unit.|Y
01|78226|15|3|Discount quoted as a one-time courtesy.|Y
01|78241|3|1|INSTALLATION INCLUDES DUAL DRIVES FIBER OPTICS|Y
01|78241|3|2|EXTERNAL CABLES CONNECTORS TRAVEL AND LABOR|Y
01|78241|3|3|4 + 1 CAPABILITIES. MACHINE DATA SHEETS REQUIRED|Y
01|78241|3|4|MAY NEED FANUC TO ADD ADDITIONAL AXIS PARAMETERS|Y
01|78254|1|1|Repair of customer's 124311 SN# 6793004|Y
01|78254|1|2|Ref: RGA# LVR-50298|Y
01|78254|2|1|MI40 threadring assembly broken and must be replaced.|Y
01|78254|2|2|Labor is included.|Y
01|78274|1|1|NET pricing Non-returnable Non-cancelable|Y
01|78276|3|1|CAT40-MMC8C-150U  CAT40 10mm Mini-Mini Chuck|Y
01|78276|3|2|This is a special items. Once a purchase order is|Y
01|78276|3|3|placed it cannot be cancelled or returned.|Y
01|78277|1|1|Ref: RGA# TOR-50319|Y
01|78277|1|2|Repair of Tool 1: HP-4|Y
01|78277|5|1|Tool repair cost for Tool 1: $700.18 net.|Y
01|78277|7|1|Recommend replacement Tool 2: unit is unrepairable due|Y
01|78277|7|2|to the below reasons.|Y
01|78277|7|3|Damage to body & wear on bottom of magnetic base.|Y
01|78277|7|4|Slide head damaged dust cover missing LED not|Y
01|78277|7|5|working.|Y
01|78277|7|6|With new slide head and magnetic base unit is 0.019|Y
01|78277|7|7|out of spec.|Y
01|78277|7|8|Additional discount quoted as a one-time courtesy.|Y
01|78277|7|9|Tool 1 : it is more cost effective to replace|Y
01|78277|7|10|recommend replacement.|Y
01|78295|6|1|We will plug the DIN holes on these available 18mm|Y
01|78295|6|2|Standard CAT40 18mm holders if they wish to go this|Y
01|78295|6|3|route. These Metric CAT40 EMH are being discontinued.|Y
01|78295|6|4|I recommend they consider the Taper Plus ER32 Collet|Y
01|78295|6|5|Chuck instead as quoted above.|Y
01|78299|3|1|INSTALLATION INCLUDES DUAL DRIVES FIBER OPTICS|Y
01|78299|3|2|EXTERNAL CABLES CONNECTORS TRAVEL AND LABOR|Y
01|78299|3|3|4 + 1 CAPABILITIES. MACHINE DATA SHEETS REQUIRED|Y
01|78299|3|4|MAY NEED FANUC TO ADD ADDITIONAL AXIS PARAMETERS|Y
01|78300|1|1|INCLUDED SERVO MOTOR AND EXTERNAL CABLES|Y
01|78311|1|1|Installed with Pull Stud PS-N63VE|Y
01|78319|1|1|Recommend replacement  unit is un-repairable due to|Y
01|78319|1|2|the below reasons.|Y
01|78319|1|3|Main housing cracked in 3 places. Tap retaining sleeve|Y
01|78319|1|4|is broken off at bottom.|Y
01|78332|1|1|Price quoted is for a set consisting of 3pcs.|Y
01|78332|1|2|ETA from factory is aprox 12 weeks but we have a|Y
01|78332|1|3|complete H037M12 Chuck in stock and can remove the set|Y
01|78332|1|4|of jaws from it if they need sooner.|Y
01|78335|1|1|Replacement Cyl for HH32C8 (revised to C1TA140 H-496)|Y
01|78341|6|1|*originally quoted|Y
01|78341|7|1|Alternative for TP version. This is a STD CAT50 holder|Y
01|78346|5|1|*nose diameter 1.083|Y
01|78362|1|1|Installed with PS-O60 retention knob|Y
01|78362|3|1|Installed on NC5-100 holder at factory|Y
01|78362|5|1|Installed with PS-O60 retention knob|Y
01|78362|7|1|Installed on NC5-100 holder at factory|Y
01|78362|9|1|Installed with PS-O60 retention knob|Y
01|78362|11|1|Installed on NC5-100 holder at factory|Y
01|78362|13|1|Installed with PS-O60 retention knob|Y
01|78362|15|1|Installed on NC5-100 holder at factory|Y
01|78362|17|1|Installed with PS-O60 retention knob|Y
01|78362|19|1|Installed on NC5-100 holder at factory|Y
01|78362|21|1|Installed with PS-O60 retention knob|Y
01|78362|23|1|Installed on NC5-100 holder at factory|Y
01|78362|26|1|Installed with PS-O60 retention knob|Y
01|78362|27|1|Installed on NC5-100 holder at factory|Y
01|78362|29|1|Installed with PS-O60 retention knob|Y
01|78362|30|1|Installed on NC5-100 holder at factory|Y
01|78381|2|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|78381|3|1|Adapter Plate for HW-12-HS|Y
01|78381|3|2|Non-returnable Non-cancelable|Y
01|78381|3|3|ETA 9-10 wks|Y
01|78381|4|1|NET pricing|Y
01|78381|4|2|Machine Information will need to be confirmed|Y
01|78391|1|1|Hot Deal Quoted as Net Price to R G Brewton.|Y
01|78391|1|2|Net Price to End User is $109.00|Y
01|78391|2|1|Hot Deal Quoted as Net Price to R G Brewton.|Y
01|78391|2|2|Net Price to End User is|Y
01|78392|1|1|Price is less servo-motors.|Y
01|78392|1|2|Motors to be transferred from unrepairable unit.|Y
01|78392|2|1|Price is less servo-motors.|Y
01|78392|2|2|Motors to be transferred from unrepairable unit.|Y
01|78393|1|1|*|Y
01|78393|2|1|*|Y
01|78393|3|1|*|Y
01|78400|5|1|Installation includes machine side components: drive|Y
01|78400|5|2|unit interface cables external cables short bar|Y
01|78400|5|3|fiber optic cable hydraulic hoses axis exspansion|Y
01|78400|5|4|card.|Y
01|78400|7|1|COMPLIMENTRY LYNDEX NIKKEN TOOL CERTIFICATE|Y
01|78400|7|2|TO BE USED FOR SPINDLE TOOLING|Y
01|78401|1|1|Includes Haas motor and cable sets.|Y
01|78409|2|1|Includes: Drive unit if required short bar fiber|Y
01|78409|2|2|optic cable communication cable bulkhead cables|Y
01|78409|2|3|external cables parameter changes service time and|Y
01|78409|2|4|travel.|Y
01|78412|1|1|with A1/2-20SL Coolant Arbor Screw below installed|Y
01|78412|1|2|prior to shipping.|Y
01|78412|3|1|Swap A1/2-20 Standard Arbor Screw out for the Jet Slot|Y
01|78412|3|2|Coolant version A1/2-20SL. Price of holder includes the|Y
01|78412|3|3|Coolant Arbor Screw shown above.|Y
01|78420|7|1|for DMF500 Linear Deckel Maho|Y
01|78420|7|2|*net price|Y
01|78425|1|1|Reapir of MNL12-ER40OZ SN#A0208|Y
01|78425|1|2|Ref: RGA#LVR-50324|Y
01|78425|2|1|Bearings Seals O-rings Spindle Spindle Cover|Y
01|78425|2|2|and Collet Nut must be replaced.|Y
01|78425|2|3|Labor is include.|Y
01|78425|3|1|Reapir of MNL12-ER40OZ SN#A0209|Y
01|78425|3|2|Ref: RGA#LVR-50324|Y
01|78425|4|1|Bearings Seals O-rings Collet Nut must be replaced.|Y
01|78425|4|2|Labor is include.|Y
01|78425|6|1|Discount quoted core trade in.|Y
01|78427|1|1|Repair of MNL12-ER32Z-MS SN#A2029|Y
01|78427|1|2|Ref: RGA# LVR-50024|Y
01|78427|2|1|Bearings Seals Collet Nut must be replaced.|Y
01|78427|2|2|Labor is include.|Y
01|78428|3|1|Lyndex-Nikken will make the position block upon receipt|Y
01|78428|3|2|of spindle drawing information|Y
01|78428|3|3|*net price|Y
01|78430|1|1|Metrol Drill Bit Detect Model#: DFM3-L-B18-H-V|Y
01|78430|1|2|Special Order. Unit Price Each.|Y
01|78430|2|1|Metrol Drill Bit Detect Model#: DFM3-R-B18-H-V|Y
01|78430|2|2|Special Order. Unit Price Each|Y
01|78430|3|1|Tool Sensor (Metrol) Model#: P10DA-A|Y
01|78430|3|2|Special Order. Unit Price Each|Y
01|78430|4|1|Touch Sensor (Metrol) Model#: H4DAS-06S|Y
01|78430|4|2|Special Order. Unit Price Each|Y
01|78430|5|1|Sensor (Metrol) Model#: H4E-14-02S|Y
01|78430|5|2|Special Order. Unit Price Each|Y
01|78430|10|1|Howa Gripper Model#: R1|Y
01|78430|10|2|Special Order. Unit Price Each|Y
01|78430|11|1|Howa Gripper Model#: HS-127-4|Y
01|78430|11|2|Special Order. Unit Price Each|Y
01|78430|12|1|Howa Gripper Model#: CT-127-4|Y
01|78430|12|2|Special Order. Unit Price Each|Y
01|78462|1|1|Tooling Certificate Number: 13366-1007-080217 RT|Y
01|78463|1|1|Quoted as 1~5 tools.|Y
01|78463|2|1|Quoted as 6~10 tools.|Y
01|78463|3|1|Quoted as 11+ tools.|Y
01|78467|4|1|CKFN12-10 CCK Coolant Nut/Cap OD12mm ID10mm Jet Slotted|Y
01|78500|2|1|PLEASE ADVISE SERIAL # OF UNIT BEING REPLACED|Y
01|78500|2|2|TECHNICAL/DESIGN INFO ATTACHED|Y
01|78500|2|3|NO MOTOR INCLUDED|Y
01|78504|1|1|Lead time would be approx. 3 weeks from order|Y
01|78509|1|1|Test Cut-Non-returnable|Y
01|78509|2|1|Test Cut Non-Returnbale|Y
01|78509|3|1|Test Cut Non-returnable|Y
01|78515|1|1|This item is not returnableall sales are final|Y
01|78520|3|1|for 17/32 / 0.531|Y
01|78524|12|1|Quoted at NET price/non-returnable|Y
01|78532|1|1|Non-returnable Non-cancelable|Y
01|78548|1|1|Repair of T32332A02 SN# A0181|Y
01|78548|1|2|Ref: RGA# LVR-50354|Y
01|78548|2|1|Spindle Bearings Seals O-rings Minor Parts must be|Y
01|78548|2|2|replaced.|Y
01|78548|2|3|Labor is include.|Y
01|78548|3|1|Repair of T32332A02 SN# A0183|Y
01|78548|4|1|Bearings Seals O-rings Minor Parts must be replaced.|Y
01|78548|4|2|Labor is include.|Y
01|78553|1|1|Repair of customer MNL12-ER40OZ SN# A0131|Y
01|78553|1|2|Ref: RGA# LVR-50334|Y
01|78553|2|1|Collet nut Bearings Seals must be replaced.|Y
01|78553|2|2|Labor included.|Y
01|78553|3|1|Repair of customer MNL12-ER40OZ SN# A0134|Y
01|78553|4|1|Collet nut Bearings Seals must be replaced.|Y
01|78553|4|2|Labor included.|Y
01|78572|1|1|TURBOMAQUINAS CODE BC-1310|Y
01|78572|2|1|TURBOMAQUINAS CODE BC-1311|Y
01|78572|3|1|TURBOMAQUINAS CODE BC-1312|Y
01|78572|4|1|TURBOMAQUINAS CODE BC-1313|Y
01|78572|5|1|TURBOMAQUINAS CODE BC-1314|Y
01|78572|6|1|TURBOMAQUINAS CODE BC-1315|Y
01|78572|7|1|TURBOMAQUINAS CODE BC-1316|Y
01|78572|8|1|TURBOMAQUINAS CODE BC-1317|Y
01|78572|9|1|TURBOMAQUINAS CODE BC-1318|Y
01|78572|10|1|TURBOMAQUINAS CODE BC-1319|Y
01|78572|11|1|TURBOMAQUINAS CODE BC-1320|Y
01|78572|12|1|TURBOMAQUINAS CODE BC-1321|Y
01|78572|13|1|TURBOMAQUINAS CODE BC-1322|Y
01|78572|14|1|TURBOMAQUINAS CODE BC-1323|Y
01|78572|15|1|TURBOMAQUINAS CODE BC-1324|Y
01|78572|16|1|TURBOMAQUINAS CODE BC-1325|Y
01|78572|17|1|TURBOMAQUINAS CODE BC-1326|Y
01|78572|18|1|TURBOMAQUINAS CODE BC-1327|Y
01|78572|19|1|TURBOMAQUINAS CODE BC-1328|Y
01|78572|20|1|TURBOMAQUINAS CODE BC-1329|Y
01|78572|21|1|TURBOMAQUINAS CODE BC-1330|Y
01|78572|22|1|TURBOMAQUINAS CODE BC-1331|Y
01|78589|1|1|Warranty repair 5AX-300 s/n: 5258|Y
01|78589|6|1|Warranty repair of customer's 5AX-300 s/n: 5258|Y
01|78589|6|2|table originally came in on RGA# TAR-49816 was|Y
01|78589|6|3|repaired and returned on Inv# 2142085.  Customer still|Y
01|78589|6|4|having brake issues.  Repair completed under warranty.|Y
01|78589|6|5|Reference RGA# TAR-50387.|Y
01|78592|3|1|Items will be a 12-13 week lead time|Y
01|78599|1|1|HSK100A-2000-4.00 with IDU 2.0 End Mill Holder|Y
01|78599|1|2|with ID chip hole and chip installed.|Y
01|78630|1|1|ETA 10-12 DAYS|Y
01|78630|2|1|ETA 10-12 DAYS|Y
01|78630|2|2|Modify CAT40-C1.1/4-105U-IDU to DIN|Y
01|78635|1|1|Ref: RGA#TAR-49951|Y
01|78635|1|2|CAT40-UMT200U Send in for evaluation.|Y
01|78644|1|1|Ref:RGA#TOR-50374|Y
01|78644|1|2|CAT40-UMT200UH The tip on the top is bent & needs to|Y
01|78644|1|3|be adjusted.|Y
01|78648|1|1|M5 x 0.8 x 25mm Metric Dog Pt Set Screw w/thru Coolant|Y
01|78648|1|2|Alloy metal.|Y
01|78648|3|1|M6 x 1.0 x 25mm Metric Dog Pt Set Screw w/thru Coolant|Y
01|78648|3|2|Alloy metal.|Y
01|78648|5|1|M8 x 1.0 x 30mm Metric Dog Pt Set Screw w/thru Coolant|Y
01|78648|5|2|Alloy metal.|Y
01|78648|7|1|M10 x 1.0 x 30mm Metric Dog Pt Set Screw w/thru Coolant|Y
01|78648|7|2|Alloy metal.|Y
01|78666|3|1|HSK63A-SK20-90P  SK20 Slim Chuck w/90mm GL Hi-Speed Nut|Y
01|78672|2|1|This item number replaces #B40SF-0750-3.54|Y
01|78673|2|1|Adaptado para elevar altura 30mm|Y
01|78673|2|2|Requiere rectificar espesor para ajustar altura final|Y
01|78673|3|1|Quick Change Trunnion|Y
01|78674|1|1|RGA# CUR-50296|Y
01|78674|1|2|Repair of C40-MRAM-IC SN#87003 01|Y
01|78674|1|3|Operator had spindle rotating wrong direction while|Y
01|78674|1|4|drilling holes and unit seized up.|Y
01|78674|2|1|O-rings seals and all bearing need to replace.|Y
01|78674|2|2|Labor is included.|Y
01|78692|1|1|2 x S32-UMT Tools are crashed.|Y
01|78692|1|2|Ref: RGA# TOR-50364|Y
01|78715|3|1|ETA 9 pieces 8/23|Y
01|78715|3|2|ETA 9 pieces 9/12 via air ETA 10/25 via Boat|Y
01|78715|3|3|ETA 9 pieces 9/19 via air ETA 11/6 week via Boat|Y
01|78715|3|4|bal of 18pcs ETA TBD|Y
01|78720|1|1|ETA 2-3 WKS|Y
01|78720|1|2|Non-returnable Non-cancelable|Y
01|78724|1|1|8 Weeks Exit Factory|Y
01|78724|1|2|6 Weeks Delivery to End User|Y
01|78724|1|3|Servo Motors will be transferred from damaged|Y
01|78724|1|4|tables at Lyndex-Nikken facility.|Y
01|78724|2|1|Air Freight - 1 Week Delivery|Y
01|78732|1|1|Converting CNC202-2W-250MA to CNC202MA|Y
01|78732|1|2|Reference RGA# TAR-50333|Y
01|78741|7|1|PART-MIM-114026: O-ring|Y
01|78741|11|1|PART-MIM-168970: Shim|Y
01|78741|12|1|PART-MIM-16427 Round Nut|Y
01|78741|14|1|PART-MIM-184433: Spindle|Y
01|78741|15|1|PART-MIM-184678: Bushing 60.2x69.2x18|Y
01|78741|16|1|PART-MIM-184679: Shaft LD60-Diam|Y
01|78741|17|1|PART-MIM-184697: Shaft LD60-Diam|Y
01|78752|1|1|3 pieces ETA via AIR 10/16|Y
01|78752|1|2|3 pieces ETA via AIR 11/27|Y
01|78753|3|1|PC-MJAW-12C-HS-3S  Master Jaws for H01MA12 3mm Serrated|Y
01|78753|3|2|Jaws sold as set/3pcs|Y
01|78757|7|1|OK104-21030 Setting Fixture|Y
01|78761|8|1|SPECIAL INCENTIVE DISCOUNT APPLIED TO RETENTION KNOBS|Y
01|78761|8|2|IF PURCHASED W/ QUANTITY OF TOOLHOLDERS SHOWN ON QUOTE!|Y
01|78764|1|1|External cables included.|Y
01|78771|1|1|With 6mm ball and 44mm OD|Y
01|78775|1|1|Includes: 2-180MM High Speed tables with installation|Y
01|78775|1|2|kits for the Brother R450X1 machine.|Y
01|78786|1|1|Includes: 2-CNCZ180LSA3 High Speed tables with|Y
01|78786|1|2|installation kit for the Brother TC31A machine.|Y
01|78808|48|1|Wrench for SK6 coolant disc|Y
01|78808|55|1|*Matsuura machine|Y
01|78816|1|1|Repair of 5AX-500FA-APC s/n: 1002|Y
01|78816|1|2|Reference RGA# TAR-50410|Y
01|78816|13|1|Expedite fee to have table completed and shipped in|Y
01|78816|13|2|5 business days.|Y
01|78835|1|1|Repair of 1x MNL12-ER32X-OFF SN# A0022|Y
01|78835|1|2|Ref: RGA# LVR-50098|Y
01|78835|2|1|Collet nut Bearings Seals O-ring must be replaced.|Y
01|78835|2|2|Labor is include.|Y
01|78838|1|1|Repair of PF-2 V1 Stylus is broken and it doen't|Y
01|78838|1|2|work.|Y
01|78838|1|3|Ref: RGA# TOR-50386|Y
01|78841|1|1|Please note that the tool uses a 8mm hex wrench which|Y
01|78841|1|2|we do not supply.|Y
01|78852|1|1|Items is BO'd but schedule to arrive in stock 8/15/2017|Y
01|78867|1|1|Offered as a replacement to DC SS-1250-ER32-060|Y
01|78867|1|2|Customer needs to review due to the length is different|Y
01|78872|8|1|Lead time is 4-5 weeks|Y
01|78880|1|1|Includes blank draw nut.|Y
01|78935|2|1|Modification for Jet Slots|Y
01|78935|2|2|1pc = $125.00 ea.|Y
01|78935|2|3|2-5 pcs = $85.00 ea.|Y
01|78951|1|1|Non-returnable Non-cancelable NET pricing|Y
01|78951|1|2|5 PC price is $300.00 NET|Y
01|78951|3|1|Non-returnable Non-cancelable NET pricing|Y
01|78951|3|2|5 PC Price $300.00 NET|Y
01|78951|5|1|Non-returnable Non-cancelable NET pricing|Y
01|78951|5|2|5 PC price $300.00 NET|Y
01|78951|7|1|Non-returnable Non-cancelable NET pricing|Y
01|78951|7|2|5 PC price $300.00 NET|Y
01|78951|9|1|Non-returnable Non-cancelable NET pricing|Y
01|78951|9|2|5 PC Price $300.00|Y
01|78951|11|1|Non-returnable Non-cancelable NET pricing|Y
01|78951|11|2|5 PC price $300.00 NET|Y
01|78951|13|1|Non-returnable Non-cancelable NET pricing|Y
01|78951|13|2|5 PC pricing $317.00 NET|Y
01|78954|1|1|Quoted at net price!|Y
01|78968|1|1|Tooling Certificate Number: 13485-1005-072717|Y
01|78973|14|1|7 pieces in stock|Y
01|78973|14|2|2 pieces ship 1 week|Y
01|78973|14|3|1 piece ship 9/18|Y
01|78979|1|1|Item is backordered until 12/16/2017|Y
01|78998|1|1|Includes Sigma5 servomotors and Haas home switch|Y
01|78998|2|1|4 Port Manifold|Y
01|79000|4|1|This item is no longer available discontinued|Y
01|79004|1|1|HSK40E-VC6-60  VC6 60mm GL|Y
01|79004|3|1|HSK40E-VC6-60  VC6 60mm GL|Y
01|79004|5|1|HSK40E-VC6-60  VC6 60mm GL|Y
01|79036|1|1|1-2 weeks lead|Y
01|79036|2|2|1-2 weeks lead|Y
01|79036|4|1|1-2 weeks lead|Y
01|79036|5|1|1-2 week lead|Y
01|79040|1|1|Unit price per pc|Y
01|79045|1|1|Mori part# T32332|Y
01|79045|1|2|Net Price|Y
01|79046|2|1|$50.00 per holder|Y
01|79046|4|1|$50.00 per holder|Y
01|79056|7|1|MZST68-SK20X-ICE|Y
01|79056|8|1|MZST68-SK20Z-ICE|Y
01|79057|10|1|Retention Knob promotion|Y
01|79069|9|1|*Not avail in Taper Plus - this CAT40 can be used|Y
01|79069|9|2|in the Big Plus Spindle|Y
01|79069|10|1|Collet Promo|Y
01|79071|1|1|Non-returnable Non-cancelable|Y
01|79071|1|2|Quoted as NET pricing|Y
01|79079|12|1|Place Holder-specify sizes at time of order|Y
01|79079|13|1|Place Holder-specify sizes at time of order|Y
01|79079|14|1|Place Holder-specify sizes at time of order|Y
01|79081|1|1|Tooling Certificate #13485-954-042117|Y
01|79083|1|1|Service call for TAT-250 s/N: 3990|Y
01|79083|1|2|Dana Etrac 8/15/17|Y
01|79083|1|3|Service call performed by Pedro Suarez|Y
01|79083|2|1|Transit Time: 8 hours x $60.00/hr = $480.00|Y
01|79083|2|2|Meals: $35.00|Y
01|79085|1|1|NET COST PRICE for 1pc only|Y
01|79085|2|1|NET COST PRICE for 5pcs only|Y
01|79085|4|1|C5-MDSK16-95|Y
01|79085|4|2|NET COST PRICE for 2pcs only|Y
01|79086|3|1|Includes: drive amp bulk head cable set external|Y
01|79086|3|2|cable set fiber optic cable communication cable|Y
01|79086|3|3|travel and labor for installation.|Y
01|79093|1|1|AHL-BT30-B1.55  Universal Angle Head|Y
01|79093|1|2|ER20 Max.Shank Dia. 13mm  Weight 4kg|Y
01|79093|1|3|Unit Price Each.|Y
01|79093|2|1|AHL-BT30-B1.65  Universal Angle Head|Y
01|79093|2|2|ER11 Max.Shank Dia. 7mm  Weight 1.8kg|Y
01|79093|2|3|Unit Price Each.|Y
01|79093|3|1|BT-1 Setting Block|Y
01|79093|3|2|1-2 Weeks after we receive Spindle dimension.|Y
01|79093|3|3|Unit Price Each.|Y
01|79107|10|1|Uses same wrenches as the lines 8 and 9|Y
01|79111|2|1|Non-returnable Non-cancelable|Y
01|79111|3|1|NET CHARGE|Y
01|79111|3|2|Non-returnable Non-cancelable|Y
01|79112|1|1|1 DEGREE INDEXER WITH HIRTH COUPLING|Y
01|79112|1|2|CONFIRMATION OF MACHINE DATA SHEETS WILL BE NEEDED|Y
01|79112|1|3|CONFIRMATION OF PROPER FIT TO MACHINE|Y
01|79112|1|4|``|N
01|79112|3|1|Includes drive unit bulkhead cables external cables|Y
01|79112|3|2|short bar fiber optic cable communications cable|Y
01|79112|3|3|parameter changes labor travel|Y
01|79124|1|1|Ref: TAB-50366|Y
01|79124|1|2|5AX-120WA SN#425 There is excessive play in the|Y
01|79124|1|3|tilting axis.|Y
01|79127|14|1|7 pieces in stock|Y
01|79127|14|2|2 pieces ship 1 week|Y
01|79127|14|3|1 piece ship 9/18|Y
01|79131|3|1|Includes: Drive unit short bar fiber optic cable|Y
01|79131|3|2|communications cable bulkhead cables external cables.|Y
01|79132|1|1|Unit price per piece|Y
01|79133|1|1|unit price per piece|Y
01|79133|2|1|unit price per piece|Y
01|79144|1|1|Items due to WH 1 the last week of October|Y
01|79149|4|1|Custom Pos Block. Includes AHA-01000-02 bushing|Y
01|79149|4|2|Delivery is upon receipt of spindle drawing information|Y
01|79149|4|3|*Net price|Y
01|79149|6|1|Bushing only - used in position block made by customer|Y
01|79149|6|2|Net Pricing|Y
01|79149|8|1|*2Yr warranty from Invoice Date*|Y
01|79156|4|1|Includes hydraulic hoses and fittings|Y
01|79164|1|1|MZQT5-ER32Z-MS-ICE|Y
01|79164|1|2|Main Sun ER32 Z Axis Head|Y
01|79168|74|1|1pc 1 Week Shipping|Y
01|79168|75|1|1pc 1 Week Shipping|Y
01|79168|76|1|1pc 1 Week Shipping|Y
01|79169|7|1|CNC321TOSP4-M|Y
01|79172|2|1|PLEASE MAKE NOTE OF CORRECT PART NUMBER|Y
01|79172|2|2|CNC-501OSP4-M CORRECT FOR OSP/MA CONTROL|Y
01|79172|2|3|INCLUDING EXTERNAL CABLES|Y
01|79172|3|1|HYDRAULIC UNTIT NEEDED FOR ROTARY TABLE BRAKE|Y
01|79172|7|1|COMPLIMENTRY LYNDEX NIKKEN TOOL CERTIFICATE|Y
01|79172|7|2|TO BE USED FOR SPINDLE TOOLING|Y
01|79173|4|1|7 Stock/ 30 pcs due 8-21/23 pc at Nikken Japan|Y
01|79173|12|1|6-pcs 1~2 Weeks/Bal End of Sept|Y
01|79173|13|1|1-stk/ 5-pcs 1~2 Weeks Bal 8~9 Weeks|Y
01|79181|2|1|Installation inlcudes: Dual axis drive  short bar|Y
01|79181|2|2|communications cables fiber optic cables bulkhead|Y
01|79181|2|3|cables external cables parameter changes service|Y
01|79181|2|4|time and travel.|Y
01|79187|2|1|Delivery 1-2 weeks upon receipt of order|Y
01|79187|10|1|Collet Promotion|Y
01|79197|1|1|Ref: TAR-50341|Y
01|79197|1|2|CNC180BFA SN#10359 Send in for evaluation.|Y
01|79199|10|1|1pc 1Week Shipping|Y
01|79199|13|1|1pc 1 Week Shipping|Y
01|79199|14|1|1pc 1Week Shipping|Y
01|79210|1|1|Ref: TAR-50343|Y
01|79210|1|2|CNC180BFA SN# 10365 send in for evaluation.|Y
01|79211|4|1|CC08-C4(AC410K) Nikken Insert Tip for Coated Carbide K|Y
01|79211|4|2|1 pack equals 10 pieces.|Y
01|79211|5|1|CC08-C4(AC630M)Nikken Insert Tip for Coated Carbide M|Y
01|79211|5|2|1 pack equals 10 pieces.|Y
01|79211|6|1|CC08-C8(AC410K) Nikken Insert Tip for Coated Carbide K|Y
01|79211|6|2|1 pack equals 10 pieces.|Y
01|79211|7|1|CC08-C8(AC630M)Nikken Insert Tip for Coated Carbide M|Y
01|79211|7|2|1 pack equals 10 pieces.|Y
01|79216|1|1|Ref: RGA# TAR-50396|Y
01|79216|1|2|5AX-130FA SN# 1658looses 4th axis about halway through|Y
01|79216|1|3|of 5th axis ans is making noise like something came|Y
01|79216|1|4|loose.|Y
01|79226|1|1|9-ZMAC20-40V Modular Type ZMAC Boring Head|Y
01|79226|1|2|Triangular Insert Type Head|Y
01|79227|4|1|Custom Positioning Block for Fanuc Robodrill|Y
01|79227|4|2|*net price|Y
01|79228|7|1|Test Tool 50% Off Same Warranty|Y
01|79230|1|1|Ref: RGA# TOR-50423|Y
01|79230|1|2|1xBT30-NPU8-70 Dropped tool and need to re-balance.|Y
01|79233|1|1|Ref: RGA# TOR-50380|Y
01|79233|1|2|CAT40-C3/4-105UG Send in for evaluation.|Y
01|79233|8|1|May be more cost effective to replace.|Y
01|79243|1|1|Quoted at NET price.|Y
01|79259|3|1|Hi-Speed Coolant Nuts to be installed prior to shipping|Y
01|79263|5|1|HSK100A-SM1500-8.00 1.1/2 Shell Mill Holder 8.0 Gage|Y
01|79263|5|2|Net Price Quote for 1~4 pieces.|Y
01|79263|6|1|HSK100A-SM1500-8.00 1.1/2 Shell Mill Holder 8.0 Gage|Y
01|79263|6|2|Net Price Quote for 5 pieces.|Y
01|79263|8|1|HSK100A-SM2000-8.00 2.0 Shell Mill Holder 8.0 Gage|Y
01|79263|8|2|Net Price Quote for 1~4 pieces.|Y
01|79263|9|1|HSK100A-SM2000-8.00 2.0 Shell Mill Holder 8.0 Gage|Y
01|79263|9|2|Net Price Quote for 5+ pieces.|Y
01|79263|11|1|Installation Chip Hole & Chip w/ Primetals RFID Chip.|Y
01|79264|1|1|No Motors or external cables included.|Y
01|79264|1|2|For a replacement on Robodrill T14IF control 31i-A5|Y
01|79264|1|3|EU: Unisia|Y
01|79270|7|1|Could be a typo original requested in the email is|Y
01|79270|7|2|HSK63A-ER16-6.00 doesn't availabe the closet part #|Y
01|79270|7|3|HSK63A-ER16-5.00|Y
01|79278|36|1|COLOR WILL BE DOOSAN GREY COLOR AS PROVIDED|Y
01|79278|38|1|HYD MODIFICATION TO TABLE FOR PLUMBING AND ADDITIONAL|Y
01|79278|38|2|6 PORTS WITH ADDITIONAL MANIFOLD|Y
01|79289|1|1|20/40 Dual Axis amplifier|Y
01|79289|4|1|Special direct mount cables Nemcomed spec|Y
01|79289|6|1|CNC260 with special Nemcomed spec direct mount cables|Y
01|79289|7|1|Includes machine side cabling fiber optic cable|Y
01|79289|7|2|short bar axis card travel labor and expenses|Y
01|79292|1|1|5AX-2MT-105-120 s/n: 8210|Y
01|79292|1|2|Reference RGA# TAR-50438|Y
01|79294|1|1|Ref: TAR-50413|Y
01|79294|1|2|CNCZ202LSA3 SN#1017|Y
01|79294|1|3|When brake is desengaged oil is coming out of table.|Y
01|79298|2|1|PLEASE ADVISE SERIAL # OF UNIT BEING REPLACED|Y
01|79298|2|2|TECHNICAL/DESIGN INFO ATTACHED|Y
01|79298|2|3|NO MOTOR INCLUDED|Y
01|79300|1|1|Ref:RGA#TAR-50342|Y
01|79300|1|2|CNCZ260FA SN#5105 Send in for evaluation.|Y
01|79308|7|1|ref. 124635|Y
01|79308|8|1|ref. 124873|Y
01|79308|9|1|ref. 152679|Y
01|79308|10|1|ref. 152685|Y
01|79358|1|1|Installing customer's motor and cabling|Y
01|79398|1|1|No incluye Motores ni cables.|Y
01|79398|1|2|Mesa para reemplazo de una existente|Y
01|79398|1|3|Maquina Robodrill AET14IF control 31i-A5|Y
01|79399|2|1|13 week lead time|Y
01|79404|1|1|13 week lead time|Y
01|79406|21|1|Please note: Retention knob promotion is limited to|Y
01|79406|21|2|one retention knob per mataching taper toolholder.|Y
01|79420|5|1|*wrench for CAT40 SK16 collet chuck|Y
01|79431|3|1|100MM three spindle high speeed table with motor|Y
01|79431|3|2|REPLACEMENT FOR EXISTING GENDRO TABLE|Y
01|79431|3|3|WILL NEED BILL OF MATERIALS TO DETERMINE MOTOR WIRING|Y
01|79431|3|4|ETC. DELIVERY BASED ON AVAILABILITY IF SERVO MOTOR|Y
01|79431|6|1|draw bolt included|Y
01|79431|6|2|please specify on order|Y
01|79431|10|1|EXTERAL CABLE SET. SCHEMATICS NEEDED|Y
01|79466|1|1|1pc pricing|Y
01|79466|2|1|2pc pricing|Y
01|79466|3|1|3pc pricing|Y
01|79466|4|1|4pc pricing|Y
01|79466|5|1|5pc pricing|Y
01|79467|1|1|1pc pricing|Y
01|79467|2|1|2pc pricing|Y
01|79467|3|1|3pc pricing|Y
01|79489|1|1|HO9M12 Special Chuck 6 Jaw ID Clamping|Y
01|79489|1|2|Part Model: Front Support Housing|Y
01|79489|1|3|DWG No. JR3P-7F335-MB-P|Y
01|79489|1|4|End User: Linamar|Y
01|79489|3|1|PC-DRAWBAR-OS-V40 Draw bar.|Y
01|79490|1|1|1-2 week lead time|Y
01|79490|2|1|We need to confirm if this item is still available. I|Y
01|79490|2|2|will advise as soon as I have an answer|Y
01|79492|1|1|CNC300FA s/n: 1198E Table was crashed.|Y
01|79492|1|2|Reference RGA# TAR-50433|Y
01|79497|2|1|*Lyndex-Nikken to make position block based on receipt|Y
01|79497|2|2|of machine spindle drawing|Y
01|79509|2|1|*Lyndex-Nikken to make position block based on receipt|Y
01|79509|2|2|of machine spindle drawing|Y
01|79516|1|1|Item is available to ship in 11 weeks|Y
01|79525|1|1|Installed with 3416.00000 collet nut|Y
01|79525|2|1|Installed with 3420.00000 collet nut|Y
01|79532|5|1|Installation includes machine side components: drive|Y
01|79532|5|2|unit interface cables external cables short bar|Y
01|79532|5|3|fiber optic cable hydraulic hoses axis exspansion|Y
01|79532|5|4|card.|Y
01|79532|7|1|COMPLIMENTRY LYNDEX NIKKEN TOOL CERTIFICATE|Y
01|79532|7|2|TO BE USED FOR SPINDLE TOOLING|Y
01|79535|9|1|DIN hole burn of two pieces- CAT40-C1-85U-IDU|Y
01|79538|1|1|ETA 3 DAYS|Y
01|79546|1|1|16 pc stock/ 10 pc ETA 10/04/ 9 pcs 2-3 wks/|Y
01|79546|1|2|4 pcs pending|Y
01|79561|3|1|Installation includes: drive unit short bar fiber|Y
01|79561|3|2|optic cables communication cables bulk head cable|Y
01|79561|3|3|set external cable set parameter changes service|Y
01|79561|3|4|time and travel|Y
01|79561|4|1|$1000 Certificate redeemable on Lyndex Nikken tools|Y
01|79565|1|1|*quoted at Net price|Y
01|79572|1|1|Core trade in $1538.25 net|Y
01|79572|1|2|List price is $2501.00 less 25% core trade in discount|Y
01|79577|1|1|Please Note: This holder has been quoted at net price|Y
01|79577|1|2|with SKN-16B removed and SKN-16BJ (coolant nut)|Y
01|79577|1|3|installed at Lyndex-Nikken.|Y
01|79579|1|1|Torque Control Tap Collet ISO #3 M12M9|Y
01|79579|2|1|Torque Control Tap Collet DIN 371/376 #2 M12|Y
01|79596|2|1|Balanceable EMH on closeout clearance|Y
01|79602|1|1|Lead time 12-13 weeks|Y
01|79602|1|2|Item is non returnable or can be cancelled once ordered|Y
01|79604|8|1|Price & Delivery Pending|Y
01|79612|1|1|CNCZ180LSA3 SN#7015|Y
01|79612|1|2|Ref:RGA# TAR-50467|Y
01|79612|1|3|Brake does not hold. Send in for evaluation.|Y
01|79613|5|1|Lead time 9-11 weeks|Y
01|79616|1|1|This version can be used dry or with coolant|Y
01|79618|1|1|Net price quoted for 1~12 tools.|Y
01|79618|3|1|Net price quoted for 13~24 tools.|Y
01|79618|5|1|Freight fee to send GKN chips to Japan.|Y
01|79619|1|1|2pcs available.|Y
01|79619|2|1|10pcs available|Y
01|79631|1|1|Seco's GL:  2.756|Y
01|79632|2|1|External Cables for both Axis|Y
01|79639|2|1|Cable sets for both axis|Y
01|79639|4|1|Std. Shipping (estimate only)|Y
01|79643|1|1|Cross from MD MNL0020732|Y
01|79643|2|1|Cross from MD MNL0011532|Y
01|79662|1|1|ETA 10-12 DAYS|Y
01|79662|2|1|ETA 10-12 DAYS|Y
01|79662|2|2|Modify CAT40-C1.1/4-105U-IDU to DIN|Y
01|79665|2|1|1-1/2in Boring bar holder; Main/sub output|Y
01|79670|2|1|12 pcs in 1-2 weeks balance in 2.5-3 wks|Y
01|79690|1|1|HSK80F/LPM-C1-85U|Y
01|79690|1|2|HSK80F Taper 1.00 Special Milling Chuck w 85mm|Y
01|79690|1|3|gage length. WITH Makino Pin|Y
01|79691|1|1|NBT40 Stub Mill Arbor 1.25 X 3.5  Coolant Thru|Y
01|79691|1|2|Greener Drawing # BT40PLUS-SMCH-1.25|Y
01|79692|2|1|RNC 8380 +/- 2 Big Bore Scale with Mounting Kit|Y
01|79692|3|1|NT50 Taper Center Socket|Y
01|79692|4|1|Hydraulic Cylinder and Adapter for NT50 Socket|Y
01|79692|5|1|Power and Signal/Feedback Cable Set|Y
01|79692|6|1|Manual Lever Valve for Tailstock 2000 PSI|Y
01|79692|7|1|Hydraulic Hose Set|Y
01|79692|8|1|Special Hydraulic Tailstock per Customer|Y
01|79692|8|2|Drawing 500152-T-1SHT1 Rev Level B|Y
01|79692|9|1|Onsite Technican to facilitate Tailstock and|Y
01|79692|9|2|Rotary table setup.|Y
01|79694|1|1|SK10-3AC|Y
01|79700|1|1|Non-Returnable Non-cancelable|Y
01|79711|4|1|wrench for chuck on line item above and below|Y
01|79711|7|1|This pull stud option will work as well as the PS-16|Y
01|79717|1|1|Service call completed by Armando Mena on 8/25/17.|Y
01|79717|1|2|5AX-201 s/n: 5420|Y
01|79717|2|1|Transit Time: 11hrs x $100/hr = $1100.00 Net|Y
01|79717|2|2|Hotel: 1 night $125.00|Y
01|79717|2|3|Gas Per Mileage: 684 mi x .565/mi = $386.46 (roundtrip)|Y
01|79717|2|4|Meals: $50.00 per day.|Y
01|79724|2|1|Installation includes: Dual axis drive unit short bars|Y
01|79724|2|2|fiber optic cables communications cables bulkhead|Y
01|79724|2|3|cables external cables parameter changes service|Y
01|79724|2|4|time and travel.|Y
01|79727|1|1|Ref:RGA#LVR-50426|Y
01|79727|1|2|Repair of OKLB15M-ER32X SN#A0147|Y
01|79727|2|1|Bearings Seals Collet Nut must be replaced.|Y
01|79727|2|2|Labor is include.|Y
01|79732|8|1|6.30 GL|Y
01|79732|11|1|4.13 GL  *CP|Y
01|79736|1|1|Ref:LVR-50472|Y
01|79736|1|2|Repair of OKL3-ER32Z SN#A1452|Y
01|79736|2|1|Bearings Seals Collet Nut must be replaced.|Y
01|79736|2|2|Labor is include.|Y
01|79763|4|1|Custom Positioning Block manufactured per End User|Y
01|79763|4|2|Specs to Tim Reeves.|Y
01|79763|7|1|320-M8.0|Y
01|79763|7|2|Axial Compensating Tap Collet|Y
01|79781|7|1|*Not standard pricing/this price subject to change|Y
01|79786|2|1|Included Motor cover Special coloring|Y
01|79786|2|2|Rotary encoder(Magnescale +/- 5sec.) Accuracy Inspect-|Y
01|79786|2|3|-ion report Sub base(for Holizontal use)|Y
01|79793|1|1|1 DEGREE INDEXER WITH HIRTH COUPLING|Y
01|79793|1|2|CONFIRMATION OF MACHINE DATA SHEETS WILL BE NEEDED|Y
01|79793|1|3|CONFIRMATION OF PROPER FIT TO MACHINE|Y
01|79793|1|4|``|N
01|79793|3|1|Includes drive unit bulkhead cables external cables|Y
01|79793|3|2|short bar fiber optic cable communications cable|Y
01|79793|3|3|parameter changes labor travel|Y
01|79793|7|1|THIS IS THE CHARGE FOR THE AMPLIFIER. NORMALLY WE DO|Y
01|79793|7|2|NOT SELL AMPS ALONE DUE TO THE NATURE OF IT. IF ITS|Y
01|79793|7|3|NOT INSTALLED CORRECTLY WHO IS RESPONSIBLE ETC|Y
01|79800|2|1|Substitute for the 3/4 End Mill Holder Stock issues.|Y
01|79800|2|2|See additional discount|Y
01|79800|6|1|Alternative for Line 5|Y
01|79800|7|1|1pc stock 1pc ETA aprox 9/6|Y
01|79804|2|1|Tooling Certificate $1000.00 Face Value|Y
01|79833|1|1|Need to confirm P&D|Y
01|79833|4|1|Need to confirm P&D|Y
01|79839|1|1|External Coolant only|Y
01|79839|4|1|Internal or External Coolant-can be run dry|Y
01|79840|1|1|Alternate to part #PS-381E|Y
01|79845|1|1|Tool has sever damage and is un-repairable.|Y
01|79845|1|2|Core trade in $ 2209.35 net (list price is $4017.00|Y
01|79845|1|3|less 45% core trade in discount)|Y
01|79848|1|1|Estimate for repair of a CNC260.|Y
01|79848|1|2|Budgetary Quote for preventative maintenance.|Y
01|79848|1|3|Should there be any additional issues the price will|Y
01|79848|1|4|change; however we will notify Hendrickson prior to|Y
01|79848|1|5|proceeding.|Y
01|79848|27|1|Expedite fee to have repair completed within 3-5|Y
01|79848|27|2|business days from receipt.|Y
01|79855|2|1|Slotted Arbor Screws to be installed prior to shipping.|Y
01|79855|5|1|Slotted Arbor Screws to be installed prior to shipping.|Y
01|79857|1|1|INCLUDES 2 TABLES WITH COMPLETE ELECTRONIC PACKAGE|Y
01|79857|1|2|AND SHEETMETAL|Y
01|79857|1|3|DELIVERY  EVERYTHING IS STOCK ECEPT MOTORS|Y
01|79857|1|4|PLEASE ADVISE IF YAMAZEN CAN SUPPLY SGMPH-08A4A6S (2pcs|Y
01|79858|4|1|CONFIRMATION OF cable length and schematic needed|Y
01|79858|4|2|EXTERNAL POWER FEEDBACK CABLE SET|Y
01|79863|1|1|Ref: TAR-50450|Y
01|79863|1|2|CNCZ-180 SN# 12345  Send in for evaluation.|Y
01|79865|9|1|EXTERAL CABLE SET. SCHEMATICS NEEDED|Y
01|79872|2|1|Quoted as Net price|Y
01|79875|4|1|Quoted as NET pricing|Y
01|79875|5|1|Quoted as NET pricing|Y
01|79876|1|1|Ref: RGA#TAR-50450|Y
01|79876|1|2|TAT-170 Send in for evaluation.|Y
01|79885|1|1|consignment for 12 mo|Y
01|79885|2|1|consignment for 12 mo|Y
01|79898|3|1|C4057-0016-12.00  CAT40 ER16 Collet Chuck w/12.0 Gage|Y
01|79898|3|2|Length|Y
01|79915|2|1|DIN Modification of BT40-SK6-150 holders|Y
01|79931|2|1|Quoted as NET pricing. Non-returnable Non-cancelable|Y
01|79944|1|1|Test Price Non-returnable|Y
01|79969|13|1|*Max Torque 85Ft/lbs|Y
01|79975|2|1|*can be used for non-coolant or coolant along the flute|Y
01|79994|1|1|Tooling Certificate Number: 25000-1018-070617RT|Y
01|80002|5|1|Labor Only.|Y
01|80002|5|2|Amplifier or interface cables are not included.|Y
01|80005|2|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL Flat ended|Y
01|80005|2|2|No dimple end.|Y
01|80005|3|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL Flat ended|Y
01|80005|3|2|No dimple end.|Y
01|80005|4|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL Flat ended|Y
01|80005|4|2|No dimple end.|Y
01|80005|7|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL Flat ended|Y
01|80005|7|2|with dimple in flat end.|Y
01|80005|8|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL Flat ended|Y
01|80005|8|2|with dimple in flat end.|Y
01|80005|9|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL Flat ended|Y
01|80005|9|2|with dimple in flat end.|Y
01|80005|12|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL 37.60mm|Y
01|80005|12|2|Radius ended no dimple.|Y
01|80005|13|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL 37.60mm|Y
01|80005|13|2|Radius ended no dimple.|Y
01|80005|14|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL 37.60mm|Y
01|80005|14|2|Radius ended no dimple.|Y
01|80005|17|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL 37.60mm|Y
01|80005|17|2|Radius ended with dimple end.|Y
01|80005|18|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL 37.60mm|Y
01|80005|18|2|Radius ended with dimple end.|Y
01|80005|19|1|HSK63A-BLANK-SPECIAL 75.20mm Diam x 254mm GL 37.60mm|Y
01|80005|19|2|Radius ended with dimple end.|Y
01|80020|4|1|Lead 1-2 weeks for complete set2 items are on back|Y
01|80020|4|2|order.We can ship a partial except for 8mm & 14mm size|Y
01|80028|1|1|1 DEGREE INDEXER WITH HIRTH COUPLING|Y
01|80028|1|2|CONFIRMATION OF MACHINE DATA SHEETS WILL BE NEEDED|Y
01|80028|1|3|CONFIRMATION OF PROPER FIT TO MACHINE|Y
01|80028|1|4|``|N
01|80028|3|1|Includes drive unit bulkhead cables external cables|Y
01|80028|3|2|short bar fiber optic cable communications cable|Y
01|80028|3|3|parameter changes labor travel|Y
01|80028|4|1|EXTERNAL CABLE SET|Y
01|80066|1|1|Due to the significant damage unit is un-repairable.|Y
01|80066|1|2|Suggest replacement.|Y
01|80068|1|1|Service suggest: cleaning tool and re greasing of gear|Y
01|80068|1|2|set.|Y
01|80068|1|3|Ref: CUR-50416|Y
01|80089|1|1|1 DEGREE INDEXER WITH HIRTH COUPLING|Y
01|80089|1|2|CONFIRMATION OF MACHINE DATA SHEETS WILL BE NEEDED|Y
01|80089|1|3|CONFIRMATION OF PROPER FIT TO MACHINE|Y
01|80089|1|4|``|N
01|80089|3|1|Includes drive unitconnectors motor|Y
01|80089|3|2|short bar fiber optic cable communications cable|Y
01|80089|3|3|parameter changes labor travel|Y
01|80089|4|1|EXTERNAL CABLE SET|Y
01|80091|1|1|1 DEGREE INDEXER WITH HIRTH COUPLING|Y
01|80091|1|2|CONFIRMATION OF MACHINE DATA SHEETS WILL BE NEEDED|Y
01|80091|1|3|CONFIRMATION OF PROPER FIT TO MACHINE|Y
01|80091|1|4|``|N
01|80091|3|1|Includes drive unitconnectors motor|Y
01|80091|3|2|short bar fiber optic cable communications cable|Y
01|80091|3|3|parameter changes labor travel|Y
01|80091|4|1|EXTERNAL CABLE SET|Y
01|80094|31|1|*application:  non-coolant or coolant-Thru Tap|Y
01|80094|32|1|*application:  non-coolant or Coolant-Along-the Flutes|Y
01|80094|34|1|*application:  non-coolant or coolant-Thru Tap|Y
01|80094|35|1|*application:  non-coolant or Coolant-Along-the Flutes|Y
01|80110|1|1|Repair of customer's C40S5-0562-2.93 unit has witness|Y
01|80110|1|2|mark from possible crash. This is not warranty issue.|Y
01|80110|1|3|Reference RGA# TOR-50492|Y
01|80110|6|1|Total Repair Price: $301.83|Y
01|80110|8|1|Quoting replacement holder as it will be more cost|Y
01|80110|8|2|effective to replace the unit than repair.|Y
01|80113|1|1|Discount reflect purchase of 1~15 toolholders.|Y
01|80113|2|1|Discount reflect purchase of 16+ toolholders.|Y
01|80121|2|1|On back order with a 9/5 and 10/24 due date|Y
01|80134|2|1|For testing A21 Controller sent in on RGA# TAR-50498|Y
01|80136|2|1|Custom Positioning Block manufactured by Lyndex-Nikken|Y
01|80136|2|2|per specs provided by End User|Y
01|80143|1|1|Ref: TOR-50477|Y
01|80143|1|2|Evaluation of CAT40-Z12-100U|Y
01|80143|1|3|Send in for evaluation.|Y
01|80156|2|1|Coolant Nut to be installed prior to shipping.|Y
01|80156|2|2|Very good stock of BT30-SK10-60P here to convert to -J|Y
01|80156|5|1|18pcs in stock at factory in Japan. Also have 55pcs of|Y
01|80156|5|2|standard speed stock that can be converted if need more|Y
01|80186|2|1|ETA is based on an order by 9/15|Y
01|80200|2|1|PC-SJAW-OS-R1772/R1775 Soft Jaws|Y
01|80200|3|1|Draw Stud for H01MA15 R-1772|Y
01|80202|1|1|ETA 1-2 wks delivery|Y
01|80234|1|1|Coolant Version|Y
01|80234|2|1|Non-Coolant Version|Y
01|80239|1|1|Coolant Version|Y
01|80249|1|1|Installed with PS-O60 retention knob|Y
01|80249|3|1|Installed on NC5-100 holder at factory|Y
01|80249|5|1|Installed with PS-O60 retention knob|Y
01|80249|7|1|Installed on NC5-100 holder at factory|Y
01|80249|9|1|Installed with PS-O60 retention knob|Y
01|80249|11|1|Installed on NC5-100 holder at factory|Y
01|80249|13|1|Installed with PS-O60 retention knob|Y
01|80249|15|1|Installed on NC5-100 holder at factory|Y
01|80249|17|1|Installed with PS-O60 retention knob|Y
01|80249|19|1|Installed on NC5-100 holder at factory|Y
01|80249|21|1|Installed with PS-O60 retention knob|Y
01|80249|23|1|Installed on NC5-100 holder at factory|Y
01|80249|26|1|Installed with PS-O60 retention knob|Y
01|80249|27|1|Installed on NC5-100 holder at factory|Y
01|80249|29|1|Installed with PS-O60 retention knob|Y
01|80249|30|1|Installed on NC5-100 holder at factory|Y
01|80260|2|1|Rotary Union|Y
01|80277|15|1|HSK63F-MMC12C-165  NO QUOTE - GEAR ISSUE PROHIBITS|Y
01|80277|18|1|HSK63F-MMC12C-159AA|Y
01|80277|19|1|HSK63F-MMC12C-189AA|Y
01|80281|1|1|Net price quoted.|Y
01|80289|1|1|Mazak Live X-axis Ver Str ER25 Offset <V-Type>|Y
01|80289|1|2|DRY RUN: YES for Mazak QTN100|Y
01|80289|1|3|Net price quoted for 1~5 tools.|Y
01|80289|2|1|Mazak Live X-axis Ver Str ER25 Offset <V-Type>|Y
01|80289|2|2|DRY RUN: YES for Mazak QTN100|Y
01|80289|2|3|Net price quoted for 1~10 tools.|Y
01|80289|4|1|Mazak Live X-axis Ver Str ER25 Offset <V-Type>|Y
01|80289|4|2|IntC Coolant (1000 PSI) 6500rpm 50Nm|Y
01|80289|4|3|Net price quoted for 1~5 tools.|Y
01|80289|5|1|Mazak Live X-axis Ver Str ER25 Offset <V-Type>|Y
01|80289|5|2|IntC Coolant (1000 PSI) 6500rpm 50Nm|Y
01|80289|5|3|Net price quoted for 1~10 tools.|Y
01|80289|7|1|Mazak Live Z-axis Hor 90deg ER25 <H-Type>|Y
01|80289|7|2|DRY RUN: YES for Mazak QTN100|Y
01|80289|7|3|Net price quoted for 1~5 tools.|Y
01|80289|8|1|Mazak Live Z-axis Hor 90deg ER25 <H-Type>|Y
01|80289|8|2|DRY RUN: YES for Mazak QTN100|Y
01|80289|8|3|Net price quoted for 1~10 tools.|Y
01|80289|10|1|Quoted as 1~5 Tools|Y
01|80289|11|1|Quoted as 6~10 Tools.|Y
01|80297|1|1|Quoted 1~5 Tools|Y
01|80297|2|1|Quoted 6~10 Tools.|Y
01|80297|4|1|Quoted 1~5 Tools|Y
01|80297|5|1|Quoted 6~10 Tools.|Y
01|80297|10|1|Quoted 1~5 Tools.|Y
01|80297|11|1|Quoted 6~10 Tools|Y
01|80297|13|1|Quoted 1~5 Tools.|Y
01|80301|2|1|BT50 2.00 Shell Mill Holder w 6.00 gage length|Y
01|80316|1|1|Repair of 5AX-130ZA s/n: 1629|Y
01|80316|1|2|Reference RGA# TAR-50502|Y
01|80318|1|1|With Makino Pins|Y
01|80318|1|2|Net price reflects a purchase order of 1~9 pieces.|Y
01|80318|1|3|HSK63F/LPM-MMC12C-129-AA|Y
01|80318|2|1|Net price reflects a purchase order of 10+ pieces.|Y
01|80318|2|2|With Makino Pins|Y
01|80318|2|3|HSK63F/LPM-MMC12C-129-AA|Y
01|80322|1|1|NBT50-C42-120 Milling Chuck|Y
01|80322|1|2|Quoted at NET price.|Y
01|80356|1|1|EAKMS10310050 (Inner Ring)|Y
01|80356|2|1|EAKMS10310060 (outer ring)|Y
01|80357|1|1|Repair of customer's OKL2-ER20X S/N: AL038|Y
01|80357|1|2|Reference RGA# LVR-50493|Y
01|80357|2|1|Replace collet nut bearings seals & o-rings.|Y
01|80357|2|2|Labor is included.|Y
01|80370|1|1|Repair of customer's 2x OKL3-ER32X s/n: AL472 & AL0366|Y
01|80370|1|2|Reference RGA# LVR-50427|Y
01|80370|2|1|Both units need the following replaced:|Y
01|80370|2|2|Spindle shaft & cover gears clutch collet nut|Y
01|80370|2|3|bearings seals & o-rings.|Y
01|80370|2|4|Labor is included.|Y
01|80370|2|5|Please note technician is recommending that these|Y
01|80370|2|6|units be replaced due to significant damage and rust|Y
01|80370|2|7|on these units.|Y
01|80370|4|1|Core trade-in discount quoted.|Y
01|80370|4|2|Technician recommends purchasing replacement as there|Y
01|80370|4|3|is significant rust and damage to both units.|Y
01|80372|1|1|Special Order item.Once item is orderedthe order can|Y
01|80372|1|2|not be cancelled or returned|Y
01|80374|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|80374|3|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|80379|2|1|External Cables for both Axis|Y
01|80380|1|1|200mm TR with motors and external cables|Y
01|80380|2|1|See below|Y
01|80385|1|1|INCLUDES HAAS MOTOR AND CABLE SETS|Y
01|80385|2|1|INCLUDES HAAS MOTOR AND CABLE SETS|Y
01|80385|3|1|INCLUDES HAAS MOTOR AND CABLE SETS|Y
01|80385|4|1|INCLUDES HAAS MOTOR AND CABLE SETS|Y
01|80405|1|1|HSK63A-HC12-85  12mm ID Hydr Chuck 85mm GL|Y
01|80405|3|1|HSK63A-HC20-90  20mm ID Hydr Chuck 90mm GL|Y
01|80405|4|1|HSK63A-HC20-150  20mm ID Hydr Chuck 150mm GL|Y
01|80406|1|1|Repair of CNC260FA-M SN#6340|Y
01|80406|1|2|Ref: RGA#TAR-50430|Y
01|80406|1|3|Send in for evaluation. (Expedited)|Y
01|80406|25|1|Expedite fee to have repair completed within 3-5|Y
01|80406|25|2|business days from receipt.|Y
01|80412|1|1|Repair of TAT-105 SN#6340|Y
01|80412|1|2|Ref: RGA#TAR-50430|Y
01|80412|1|3|Send in for evaluation (Expedited)|Y
01|80412|14|1|Expedite fee to have repair completed within 3-5|Y
01|80412|14|2|business days from receipt.|Y
01|80418|1|1|Please note: kljhfgka|Y
01|80424|5|1|15 pcs in WH2|N
01|80434|1|1|Bearings/Seals/O-Ring Replacement + Labor|Y
01|80434|2|1|Option if Worm Wheel & Screw are worn|Y
01|80434|3|1|Includes: Bearings/Seals/O-Rings + Labor|Y
01|80488|1|1|H63F-SF0375-3.00 HSK63F 3/8 Shrink Fit Holder|Y
01|80488|1|2|Pre-Balanced w/DrivePins|Y
01|80488|2|1|H63F-SF0500-3.00 HSK63F 1/2 Shrink Fit Holder|Y
01|80488|2|2|Pre-Balanced w/Drive Pins|Y
01|80488|3|1|H63F-SF12-3.00 HSK63F 12mm Shrink Fit Holder|Y
01|80488|3|2|Pre-Balanced w/DrivePins|Y
01|80488|4|1|H63F-SF0625-3.00 HSK63F 5/8 Shrink Fit Holder|Y
01|80488|4|2|Pre-Balanced w/DrivePins|Y
01|80488|5|1|H63F-SF0750-3.00  HSK63F 3/4 Shrink Fit Holder|Y
01|80488|5|2|Pre-Balanced Heavy-Duty|Y
01|80488|6|1|H63F-SF0750-3.25   HSK63F 1.0 Shrink Fit Holder|Y
01|80488|6|2|Pre-Balanced Heavy-Duty w/DrivePins|Y
01|80498|1|1|Net Price Quoted|Y
01|80505|6|1|Free per Tom Trudell|N
01|80509|4|1|M4|Y
01|80509|5|1|M5|Y
01|80509|6|1|M6|Y
01|80509|7|1|M7M8|Y
01|80509|8|1|M10|Y
01|80509|9|1|M12|Y
01|80509|10|1|M16|Y
01|80509|11|1|M20|Y
01|80509|12|1|M24|Y
01|80509|13|1|M25 / 1|Y
01|80509|15|1|for 2 Shell Mill w/ 3/4 Pilot|Y
01|80510|7|1|El costo incluye la instalacion del amplificador los|Y
01|80510|7|2|cables de interfase y la visita de nuestro tecnico en|Y
01|80510|7|3|sus instalaciones para dejar la mesa en servicio.|Y
01|80583|2|1|Each rack holds 30 pcs of 5C collets|Y
01|80593|1|1|Quoted as NET pricing Non-returnable Non-Cancelable|Y
01|80593|2|1|C1SB-115 Seal Kit|Y
01|80593|2|2|Quoted as NET pricing Non-returnable Non-Cancelable|Y
01|80593|3|1|quoted as NET pricing Non-returnable Non-Cancelable|Y
01|80593|3|2|ETA 5-6 WKS|Y
01|80594|3|1|This part is the replacement for CAT40WE1/8-120U|Y
01|80594|9|1|Individual 12 pcs itemized below|Y
01|80594|22|1|Individual 9 pcs itemized below|Y
01|80594|36|1|This is a 2.50 length|Y
01|80622|2|1|*OPTIONAL* - On-Site Installation Support Includes:|Y
01|80622|2|2|A service tech to come on site and help with table|Y
01|80622|2|3|installation and parameter changes for one 5AX table.|Y
01|80631|9|1|Includes drive units fiber optic cables interface|Y
01|80631|9|2|cables short bar travel and expenses|Y
01|80635|1|1|Repair of 5AX-N400FA-85 s/n: 2579|Y
01|80635|1|2|Reference RGA# TAR-50484|Y
01|80652|3|1|*can be used Non-coolant as well|Y
01|80657|1|1|This item is non-returnable|Y
01|80657|2|1|This item is non-returnable|Y
01|80668|1|1|Includes travel/labor expenses for Lyndex technician|Y
01|80673|1|1|Item due in 6-8 weeks|Y
01|80673|1|2|d|N
01|80677|1|1|Please note:The KM42 tool is requested in a 12.7mm leng|Y
01|80677|1|2|Once an order is placed it cannot be cancelled or|Y
01|80677|1|3|or returned. Pricing is NET price|Y
01|80679|1|1|Repair of C40-MRAM-IC SN# 64877 01|Y
01|80679|1|2|Ref# RGA#LVR-50448|Y
01|80679|2|1|Replace all bearings seals and O-rings|Y
01|80679|2|2|Labor is include.|Y
01|80682|1|1|Qouted as NET pricing Non-returnable Non-cancelable|Y
01|80690|1|1|HSK80F-HC0750-100 Hydraulic Holder 3/4 x 100mm Gage|Y
01|80690|1|2|Length. With Makino Pins.|Y
01|80694|1|1|Complete kit = 2 Tables/Cables/Interface Components|Y
01|80694|3|1|$1000 Tooling Certificate|Y
01|80731|1|1|S1507-1000-9.00 special|Y
01|80731|1|2|D=2.125 150TG Straight Shank with 9.00 gage length|Y
01|80732|3|1|Delv = 1 wk after design is completed Matsura MC-600V|Y
01|80746|2|1|5 pcs stock Japan 1-2wks ARO|Y
01|80746|2|2|bal 75 days mfg + 1-2 wks ship|Y
01|80758|1|1|Tooling Certificate Number: 13170-919-020217|Y
01|80772|1|1|Ref: TAR-50527|Y
01|80772|1|2|5AX-201YA SN#3653|Y
01|80772|1|3|Blew out a seal and needs it replaced.|Y
01|80772|41|1|For rotary & tilt axis|Y
01|80808|1|1|Conversion includes motor gear cables and labour|Y
01|80808|2|1|To interface CNC200 to Makino S33 S/N V7584|Y
01|80808|2|2|Pro 3 Control with Fanuc 18i Interface|Y
01|80808|2|3|Price includes: Amplifier fiber optic hardware labor|Y
01|80820|11|1|HSK80F-ER32-3.00|Y
01|80820|11|2|Special order item will be non cancellable/returnable|Y
01|80820|11|3|once an order is placed/shipped|Y
01|80820|12|1|HSK80F-ER25-3.00|Y
01|80820|12|2|Special order item will be non cancellable/returnable|Y
01|80820|12|3|once an order is placed/shipped|Y
01|80829|1|1|HSK100A-FMH22-47-105 (HSK FMH Face Mill Arbor)|Y
01|80829|1|2|Unit Price Each.|Y
01|80829|2|1|Unit Price Each.|Y
01|80829|3|1|HSK100A-FMH40-100-105 (HSK FMH Face Mill Arbor)|Y
01|80829|3|2|In stock in JPN(Only 1pc)additional will be 13-14weeks|Y
01|80829|3|3|Unit Price Each.|Y
01|80829|8|1|Unit Price Each|Y
01|80866|1|1|Repair of MNZ20-ER25Z   SN#A0157|Y
01|80866|1|2|Ref#LVR-50558 Spindle has runout & bearings are shot.|Y
01|80866|2|1|Bearings Seals O-rings Collet Nut Minor Parts need|Y
01|80866|2|2|to replace.|Y
01|80866|2|3|Labor is included.|Y
01|80871|1|1|Non-cancelable Non-returnable|Y
01|80874|1|1|HSK125A-C3/4-4.00 Milling Chuck  3/4X 4.0 Gage|Y
01|80874|1|2|Net price reflects 1~9 holders.|Y
01|80874|1|3|We do not offer Side Lock option|Y
01|80874|2|1|HSK125A-C3/4-4.00 Milling Chuck  3/4X 4.0 Gage|Y
01|80874|2|2|Net price reflects 10+ holders.|Y
01|80874|2|3|We do not offer Side Lock option|Y
01|80874|4|1|HSK125A-C1-4.00 Milling Chuck 1.0 X 5.0 Gage|Y
01|80874|4|2|Net price reflects 1~9 holders.|Y
01|80874|4|3|This tool quoted without Side Lock option|Y
01|80874|5|1|HSK125A-C1-4.00 Milling Chuck 1.0 X 5.0 Gage|Y
01|80874|5|2|Net price reflects 10+ holders.|Y
01|80874|5|3|This tool quoted without Side Lock option|Y
01|80874|6|1|HSK125A-C1-5.00-SLG Milling Chuck 1.0 X 5.0 Gage|Y
01|80874|6|2|Net price reflects 1~9 holders.|Y
01|80874|6|3|This tool quoted Side Lock option.|Y
01|80874|7|1|HSK125A-C1-5.00-SLG Milling Chuck 1.0 X 5.0 Gage|Y
01|80874|7|2|Net price reflects 10+ holders.|Y
01|80874|7|3|This tool quoted Side Lock option.|Y
01|80874|9|1|HSK125A-C1.1/4-5.00 Milling Chuck 1.1/4 X 5.0 Gage|Y
01|80874|9|2|This tool quoted without Side Lock option|Y
01|80874|9|3|Net prices reflect order of 6 holders.|Y
01|80874|10|1|HSK125A-C1.1/4-5.00 Milling Chuck 1.1/4 X 5.0 Gage|Y
01|80874|10|2|This tool quoted Side Lock option.|Y
01|80874|10|3|Net prices reflect order of 6 holders.|Y
01|80874|11|1|HSK125A-C2-5.00-SLG Milling Chuck 2.0 X 5.0 Gage|Y
01|80874|11|2|This tool quoted without Side Lock option|Y
01|80874|11|3|Net prices reflect order of 6 holders.|Y
01|80874|12|1|HSK125A-C2-5.00-SLG Milling Chuck 2.0 X 5.0 Gage|Y
01|80874|12|2|This tool quoted Side Lock option.|Y
01|80874|12|3|Net prices reflect order of 6 holders.|Y
01|80876|1|1|CAT40-C1.1/4SL-85U-DIN|Y
01|80876|1|2|CAT40 1.1/4 Milling Chuck nose=69 DIN|Y
01|80877|1|1|Ref:LVR-50470|Y
01|80877|1|2|Repair of MNL12-ER32Z-MS SN#A1915|Y
01|80877|1|3|Unit was repaired & return 5/10/17 bearings are loose|Y
01|80877|1|4|as it is extremely loud and breaking thier tools.|Y
01|80877|2|1|Bearings selas o-rings collet nut and minor parts|Y
01|80877|2|2|must be replaced.|Y
01|80877|2|3|Labor is included.|Y
01|80908|1|1|UNV_463 HSK125A-0500A-5.750-ID-GKN With Whistle Notch|Y
01|80908|1|2|ID Chip Hole Only/Drawing C1000|Y
01|80911|1|1|UNV_468  HSK125A-0750A-4.750-ID-GKN With Whistle Notch|Y
01|80911|1|2|ID Chip Hole Only/Drawing C1000|Y
01|80912|1|1|BBH ID 1 1/2 Machine: Genos L400|Y
01|80914|1|1|UNV#472|Y
01|80915|2|1|Installation includes: Drive unit short bar fiber|Y
01|80915|2|2|optic cable communications cable external cables|Y
01|80915|2|3|parameter changes service time and travel.|Y
01|80915|4|1|Installation includes: Dual axis drive unit short bar|Y
01|80915|4|2|fiber optic cable communications cable bulkhead|Y
01|80915|4|3|cables exteranl cables parameter changes service|Y
01|80915|4|4|time and travel.|Y
01|80916|2|1|Unit Price Each.|Y
01|80918|1|1|Includes 1-Stubcap & FW-1/4|Y
01|80921|1|1|UNV# 274|Y
01|80926|1|1|UNV# 278|Y
01|80941|1|1|Lyndex-Nikken will use motor wire harness and|Y
01|80941|1|2|motor cover from previous CNC202-2W-250MA-M|Y
01|80941|1|3|returned on RGA TAR-50333.|Y
01|80941|1|4|Ship To DMA per requested frieght forwarder.|Y
01|80951|7|1|Too small for coolant ports in less than 1/4|Y
01|80956|1|1|CAPTO C8 TESTBAR 2 Diam 14.0 GL|Y
01|80962|1|1|Solid Knob for Matsuura LX160|Y
01|80962|3|1|*Coolant Through only available for Matsuura  MX330|Y
01|80962|3|2|(CAT40)|Y
01|80975|13|1|CUSTOMER ALLOWED 1pc RETENTION KNOB FREE PER MATCHING|Y
01|80975|13|2|TAPER TOOL HOLDER!|Y
01|80975|14|1|CUSTOMER ALLOWED 1pc RETENTION KNOB FREE PER MATCHING|Y
01|80975|14|2|TAPER TOOL HOLDER!|Y
01|80977|1|1|Unit Price Each.|Y
01|80977|1|2|1 pc -stock in Japan.|Y
01|80977|1|3|1 pc - It takes from 4weeks to complete.|Y
01|80985|1|1|Replacement for item sent in for evaluation/repair|Y
01|80985|1|2|with cracked spindle.|Y
01|81000|1|1|Special wireharness made in house for CNC201 s/n: 1463|Y
01|81000|2|1|Inspection and realignment of customer's motor.|Y
01|81022|1|1|Complete kit = 2 Tables/Cables/Interface Components|Y
01|81022|3|1|$1000 Tooling Certificate|Y
01|81031|1|1|HSK100A-FMH22-47-105 (HSK FMH Face Mill Arbor)|Y
01|81031|1|2|Unit Price Each.|Y
01|81031|2|1|Unit Price Each.|Y
01|81031|3|1|HSK100A-FMH40-100-105 (HSK FMH Face Mill Arbor)|Y
01|81031|3|2|Unit Price Each.|Y
01|81031|8|1|Unit Price Each|Y
01|81033|1|1|3.13 Length|Y
01|81033|2|1|5.00 Length|Y
01|81033|3|1|9.00 Length|Y
01|81033|4|1|3.50 Length|Y
01|81033|5|1|6.00 Length|Y
01|81033|6|1|7.00 Length|Y
01|81055|1|1|Non-returnable Non-cancelable|Y
01|81055|3|1|Non-returnable Non-cancelable|Y
01|81055|4|1|Non-returnable Non-cancelable|Y
01|81055|5|1|Non-returnable Non-cancelable|Y
01|81055|6|1|Non-returnable Non-cancelable|Y
01|81055|8|1|Non-returnable Non-cancelable|Y
01|81055|10|1|Non-returnable Non-cancelable|Y
01|81055|17|1|Non-returnable Non-cancelable|Y
01|81055|19|1|Non-returnable Non-cancelable|Y
01|81055|21|1|Non-returnable Non-cancelable|Y
01|81055|31|1|Non-returnable Non-cancelable|Y
01|81055|33|1|Non-returnable Non-cancelable|Y
01|81055|34|1|Non-returnable Non-cancelable|Y
01|81055|35|1|Non-returnable Non-cancelable|Y
01|81055|36|1|Non-returnable Non-cancelable|Y
01|81055|37|1|Non-returnable Non-cancelable|Y
01|81055|39|1|Non-returnable Non-cancelable|Y
01|81055|41|1|Non-returnable Non-cancelable|Y
01|81055|43|1|Non-returnable Non-cancelable|Y
01|81061|1|1|For Used Unit in showroom|Y
01|81086|1|1|MSA08-10000 Alps Rotary Tool Holder for OD Turning|Y
01|81086|3|1|MSA08-11000 Alps Rotary Tool Holder for Facing|Y
01|81086|5|1|MSA08-13000 Alps Rotary Tool Holder for OD Turning|Y
01|81086|5|2|(Oil Hole)|Y
01|81086|7|1|MSA08-12000 Alps Rotary Tool Holder for Facing(Oil Hole|Y
01|81092|6|1|For 5/8 OD Straight Shank 4MM Holder|Y
01|81097|4|1|CAT50 7/16 coolant ports|Y
01|81099|1|1|Special order item P & D to be determined.|Y
01|81099|1|2|Once ordered item cannot be cancelled or returned|Y
01|81109|1|1|PS-N46AE installed on NC5-46 at factory|Y
01|81109|2|1|this will be installed on NC5 holder|Y
01|81122|1|1|Repair of AA21N-CTRL-750 s/n: F012Z9M01630004|Y
01|81122|1|2|Reference RGA# TAR-50510|Y
01|81153|4|1|*OPTIONAL* - On-Site Installation Support Includes:|Y
01|81153|4|2|A service tech to come on site and help with table|Y
01|81153|4|3|installation and parameter changes for one CNC table.|Y
01|81161|1|1|Delivery to stock 9/27/2017 (1) pc.|Y
01|81168|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|81169|1|1|Option 1|Y
01|81169|2|1|Option 2|Y
01|81169|5|1|Confirm Shank size|Y
01|81169|6|1|Confirm shank size|Y
01|81169|9|1|Option 1|Y
01|81169|10|1|Option 2|Y
01|81169|11|1|BT50-ZMAC70-300 Boring Range 69.8~85.2|Y
01|81169|12|1|BT50-ZMAC85-315  Boring Range 84.8~100.2|Y
01|81171|2|1|Delivery is currently pending on 3pcs|Y
01|81171|2|3|Please note warranty will be voided for these items|Y
01|81171|2|4|since we are not performing the repairs.|Y
01|81198|1|1|Ref: TAR-50515|Y
01|81198|1|2|Repair of 5AX-350FA-R36 SN#3524|Y
01|81198|1|3|Send in for evaluation. Possible Blow-by in rotary|Y
01|81198|1|4|joint internally getting oil in air lines.|Y
01|81219|2|1|Bakers Dozen 1 free holder of the least expensive|Y
01|81219|2|2|if he purchases at least 13 holders.|Y
01|81220|1|1|Price reflects NET charge on holders above|Y
01|81224|2|1|*Direct Chuck 1 shank|Y
01|81224|4|1|*3/4 Shank|Y
01|81230|1|1|Repair of 5AX-130 s/n: 4929|Y
01|81230|21|1|Transit Time to Pick up and drop off table.|Y
01|81231|2|1|Coolant Collector for C1TA-140|Y
01|81242|1|1|Ref:RGA#TAR-50577|Y
01|81242|1|2|Repair of 5AX-130YA SN#1864|Y
01|81242|1|3|Send in for evaluation.|Y
01|81242|27|1|Original Labor is 35hrs taking 5hrs off to offset|Y
01|81242|27|2|previous repair/inspection fee.|Y
01|81242|28|1|Must be replaced due to external damage.|Y
01|81242|29|1|Must be replaced due to external damage.|Y
01|81270|1|1|Ref: RGA#TAR-50567|Y
01|81270|1|2|Repair of 5AX-201FA-M SN#1105|Y
01|81270|1|3|Backlash in the tilt axis.|Y
01|81312|1|1|Motors to be provided by Dorian|Y
01|81312|2|1|Motors to be provided by Dorian|Y
01|81312|3|1|External cable set (power/feedback)|Y
01|81312|5|1|Includes hoses and fittings|Y
01|81319|1|1|For Mori Seiki NHX4000|Y
01|81326|1|1|Cross for MDT-DWO-0093175-Except we only off 1|Y
01|81326|2|1|Cross for MDT-0781905|Y
01|81326|3|1|Cross for MDT-DWO0901325 we only offer ER32|Y
01|81326|4|1|Cross for MDT-DWO-0880125 we only offer ER32|Y
01|81326|5|1|Cross for MDT-DWO-0080125 Lyndex-Nikken H=70mm & ER32|Y
01|81326|8|1|Cross for MDT-0762540|Y
01|81327|1|1|Collet Range .078-.787|Y
01|81327|4|1|Collet Range .039-.629|Y
01|81327|7|1|Collet Range .039-.511|Y
01|81327|10|1|Collet Range .019-.406|Y
01|81343|1|1|Quoted as NET PRICING Non-returnable Non-cancelable|Y
01|81346|2|1|The PS-381E is non-std and non-returnable & cancelable|Y
01|81347|2|1|The PS-381E is non-std and non-returnable & cancelable|Y
01|81355|2|1|The PS-381E is non-std and non-returnable & cancelable|Y
01|81359|2|1|Core Trade In on ER25 Only|Y
01|81374|1|1|Special Live Tool for Emag VL3|Y
01|81374|1|2|ER8 x 3 Output Spaced per DWG provided|Y
01|81374|1|3|1:3 Speeder Max 10000 RPM Output|Y
01|81374|1|4|Max 2Nm per spindle Ext Coolant|Y
01|81374|1|5|Pricing is based upon a order of 3 tools.|Y
01|81378|2|1|Includes Cables Drive Unit Travel & Installation|Y
01|81382|1|1|17 in stockbalance due ETA 10/5/2017|Y
01|81393|2|1|Can be used in dry application with no coolant thru|Y
01|81393|2|2|the tool|Y
01|81426|11|1|This holder is 15000 rpm|Y
01|81432|1|1|320MM table with Haas motor and cable set.|Y
01|81432|1|2|Table will be set up for air/hyd booster.|Y
01|81432|4|1|INSTALLTION IF NEEDED TO ASSIST WITH INSTALL|Y
01|81432|4|2|MACHINE MUST HAVE 4TH AXIS ALREADY|Y
01|81432|4|3|THIS TO REPLACE A TROYKE EXISTING TABLE|Y
01|81434|1|1|Ref:RGA#TAR-50512|Y
01|81434|1|2|Repair of 5AX-2MT-105-120 SN#LN-0004|Y
01|81434|1|3|Need to rebuilt table has been sitting for a few years|Y
01|81438|1|1|Ref:RGA#TAR-50571|Y
01|81438|1|2|Repair of 5AX-201WAA21-R400 SN# 5074|Y
01|81438|1|3|Indexer has tilt over load problems also lots of|Y
01|81438|1|4|coolnat in the cover.|Y
01|81438|7|1|Damaged in shipping.|Y
01|81438|8|1|Damaged in shipping.|Y
01|81441|1|1|Conversion from Fanuc to Haas spec. This has to be done|Y
01|81441|1|2|at Lyndex Nikken table would need to be sent back.|Y
01|81441|1|3|Includes cables motors prox switch labor|Y
01|81463|1|1|Special BT50 Taper Plus with Milling Cghuck 1.1/4|Y
01|81463|1|2|External Coolant with Support Pins|Y
01|81463|1|3|Max 1200RPM 400N.m TQ|Y
01|81463|1|4|Special Order. Unit Price Each.|Y
01|81466|1|1|Replaces Discontinued HH36C6|Y
01|81467|1|1|NCAT40-SF4-160CP|Y
01|81467|2|1|NCAT40-SF6-160CP|Y
01|81467|3|1|NCAT40-SF8-160CP|Y
01|81467|4|1|NCAT40-SF10-160CP|Y
01|81467|5|1|NCAT40-SF12-160CP|Y
01|81467|6|1|NCAT40-SF16-160CP|Y
01|81471|1|1|*additional needed|Y
01|81471|3|1|replacement for 1pc E40-064|Y
01|81471|5|1|replacement for 2pc E32-040|Y
01|81474|1|1|Repair of MNL12-ER32Z SN#A3548|Y
01|81474|1|2|Customer measured .003(75um) runout on the collet|Y
01|81474|1|3|taper.|Y
01|81474|1|4|Ref:RGA#LVR-50602|Y
01|81474|2|1|Bearings Seals O-rings Collet Nut Minor part must|Y
01|81474|2|2|be replaced.|Y
01|81474|2|3|Labor is included.|Y
01|81474|6|1|$4017 list less 45% one time core trade in discount.|Y
01|81474|6|2|Due to the significant damage and might be|Y
01|81474|6|3|un-repairable. Recommend replacement tool.|Y
01|81474|6|4|Received confirm by Tom D.|N
01|81477|1|1|Repair of MNL12-ER32Z SN#A0207|Y
01|81477|1|2|Tool is making lot of noise might be bearing is bad.|Y
01|81477|1|3|Ref:RGA#LVR-50616|Y
01|81477|2|1|Gears Bearings Seals O-rings Collet Nut|Y
01|81477|2|2|Minor Parts must be replaced.|Y
01|81477|2|3|Labor is included.|Y
01|81479|1|1|Repair of customer's HSK100A-UMC2500-159|Y
01|81479|1|2|Reference RGA# TOR-50409|Y
01|81479|2|1|9C63.5 Chuck Ring Unit|Y
01|81484|1|1|Ref: RGA#CUR-50505|Y
01|81484|1|2|Repair of MRAM-NSK-M17 SN#42994 03|Y
01|81484|1|3|The gear are stripped out.|Y
01|81484|2|1|Bearings seals and o-rings must be replaced.|Y
01|81484|2|2|Labor is included.|Y
01|81505|3|1|This item is priced as a test cut tool. Monitor Machine|Y
01|81505|3|2|has not utilized SK before. One time only test cut|Y
01|81505|3|3|price.|Y
01|81512|1|1|***NO FLAT on shank diameter|Y
01|81542|1|1|Ref:TAR-50617|Y
01|81542|1|2|Repair of TAR-50617 SN#5637|Y
01|81542|1|3|Customer has issue with table.|Y
01|81547|1|1|Please advise when Okuma needs chuck. This will|Y
01|81547|1|2|determine if it will come by boat or air. Extra freight|Y
01|81547|1|3|charges might be incurred if Lyndex-Nikken flys|Y
01|81547|1|4|the chuck in.|Y
01|81547|5|1|Collar for Drawbar/Okuma Part #1Y3-3000-13|Y
01|81577|1|1|special order. unit price|Y
01|81591|1|1|Tooling Certificate Number: 13860-1036-092117|Y
01|81604|1|1|Includes External/Interface Cables and Amplifier|Y
01|81604|1|2|For one unit.|Y
01|81614|7|1|Includes SKJ25-11C coolant cap ($32.20 list) 11mm|Y
01|81631|20|1|*can be used with non-coolant through application and|Y
01|81631|20|2|coolant along the flutes|Y
01|81631|22|1|*for 2 face mill|Y
01|81631|23|1|*for 4 face mill|Y
01|81636|4|1|HSK63A-SK16C-120P-J w/Coolant Hi-Speed Nuts installed|Y
01|81636|4|2|prior to shipping.|Y
01|81636|5|1|To be installed on HSK63A-SK16C-120P prior to shipping.|Y
01|81636|13|1|HSK63A-SK25C-135P-J w/Coolant Hi-Speed Nuts installed|Y
01|81636|13|2|prior to shipping.|Y
01|81636|14|1|To be installed on HSK63A-SK25C-135P prior to shipping.|Y
01|81636|20|1|HSK63A-SK10C-105P-J w/Coolant Hi-Speed Nuts installed|Y
01|81636|20|2|prior to shipping.|Y
01|81636|21|1|HSK63A-SK10C-120P-J w/Coolant Hi-Speed Nuts installed|Y
01|81636|21|2|prior to shipping.|Y
01|81636|22|1|To be installed on HSK63A-SK10C-105P and HSK63A-SK10C-|Y
01|81636|22|2|120P prior to shipping.|Y
01|81652|1|1|Includes: (5) Endmill Holders (4) Collet Chucks|Y
01|81652|1|2|(2) Collet Wrenches and (11) Collets|Y
01|81657|1|1|Ref:RGA#CUR-50500|Y
01|81657|1|2|Repair of C40RAM-ER25-215ST SN#30105 01|Y
01|81657|1|3|Taper is damaged.|Y
01|81657|2|1|All bearings seals and O-rings must be replaced.|Y
01|81657|2|2|CAT40 spindle must be replaced.|Y
01|81657|2|3|Labor is included.|Y
01|81673|1|1|Ref: RGA# TAR-50396|Y
01|81673|1|2|5AX-130FA SN# 1658looses 4th axis about halway through|Y
01|81673|1|3|of 5th axis ans is making noise like something came|Y
01|81673|1|4|loose.|Y
01|81684|1|1|A0080G(CO 7217A) O-Ring for SKJ10-8.5C|Y
01|81684|2|1|A0067G(CO 7038A) O-Ring for SKJ10-9/32C|Y
01|81684|3|1|O-Ring for SKJ10-3/8C|Y
01|81684|4|1|O-Ring for SKJ10-7C|Y
01|81684|5|1|O-Ring for SKJ10-8C & SKJ10-5/16C|Y
01|81684|6|1|O-Ring for SKJ6-5C|Y
01|81684|7|1|O-Ring for SKJ16-16C SKJ16-5/8C & SKJ25-16C|Y
01|81684|8|1|O-Ring for SKJ16-7/16C|Y
01|81684|9|1|O-Ring for SKJ16-9/16C|Y
01|81684|10|1|O-Ring for SKJ25-18C|Y
01|81684|11|1|O-Ring for SKJ25-20C|Y
01|81684|12|1|O-Ring for SKJ25-25C|Y
01|81684|13|1|O-Ring for SKJ25-3/4C|Y
01|81684|14|1|O-Ring for SKJ6-6C|Y
01|81684|15|1|O-Ring for SKJ10-10C & SKJ16-10C|Y
01|81684|16|1|O-Ring for SKJ16-14C|Y
01|81684|17|1|O-Ring for SKJ25-7/8C|Y
01|81687|1|1|Alps # T129-500-001-98 KN Housing only for CAPTO6 45deg|Y
01|81687|1|2|offset Static Holder. (Okuma)|Y
01|81712|1|1|16C Round Collet 1-9/64|Y
01|81724|27|1|Ref for GL = deleted this item after|Y
01|81738|1|1|Tooling Certificate Number: 2925-1040-092817|Y
01|81744|1|1|Inspection fee for CAT40-SZF25-120U sent in on|Y
01|81744|1|2|RGA# TOR-50638|Y
01|81746|17|1|*for C40S7-0032-1.10|Y
01|81748|2|1|old part #CKFN1.1/8C|Y
01|81762|1|1|Repair of MZMP5-ER40Z-ICE s/n: 66924 03|Y
01|81762|1|2|Reference RGA# LVR-50628|Y
01|81762|2|1|Bearings seals & o-rings must be replaced.|Y
01|81762|2|2|Labor is included.|Y
01|81766|1|1|Direct Replacement|Y
01|81769|1|1|Ref:RGA#CUR-50490|Y
01|81769|1|2|Repair of H80FRAM-ER16-206ST SN#44608 05|Y
01|81769|1|3|Unit might be crashed.|Y
01|81769|2|1|All bearings seals and o-ring must be replaced.|Y
01|81769|2|2|Labor is included.|Y
01|81772|1|1|Balance to G2.5 Speed @15000 rpm|Y
01|81772|1|2|Part# C4011-1250-4.00|Y
01|81772|2|1|Balance to G2.5 Speed @25000 rpm|Y
01|81772|2|2|Part# C4011-1250-4.00|Y
01|81778|2|1|THIS TABLE HAS AIR BRAKE CLAMPING|Y
01|81778|17|1|INCLUDES 4+1 INSTALLATION WITH SERVO MOTOR OPTIC|Y
01|81778|17|2|CABLES CONNECTORS DRIVES travel labor|Y
01|81782|2|1|Installation includes: Drive unit short bar fiber|Y
01|81782|2|2|optic cable communications cable bulkhead cables|Y
01|81782|2|3|external cables parameter changes service time and|Y
01|81782|2|4|travel.|Y
01|81783|4|1|100 of air line|Y
01|81786|1|1|This item is non-returnable and non-refundable.|Y
01|81786|2|1|This item is non-returnable and non-refundable.|Y
01|81795|16|1|Can be machined to the desired size|Y
01|81795|16|2|Can be machined to 11mm|Y
01|81797|28|1|ETA 12-14 weeks|Y
01|81797|29|1|Slotted version can be used dry as long as coolant is|Y
01|81797|29|2|not running thru the tool|Y
01|81797|30|1|ETA 8-9 weeks|Y
01|81797|31|1|Slotted version can be used dry as long as coolant is|Y
01|81797|31|2|not run thru the tool|Y
01|81799|1|1|Inspection fee to return DD250F-150 table S/N 1016|Y
01|81799|1|2|RGA # TAR-50704|Y
01|81802|1|1|This tool is made in Japan|Y
01|81802|2|1|This tool is made in Japan|Y
01|81807|1|1|Non-returnable Non-cancelable Quoted as NET Pricing|Y
01|81810|2|1|ST10-SF0500-6.00-4.5 deg|Y
01|81829|3|1|Installation includes: drive unit short bar fiber|Y
01|81829|3|2|optic cables communication cables bulk head cable|Y
01|81829|3|3|set external cable set parameter changes service|Y
01|81829|3|4|time and travel|Y
01|81830|7|1|INSTALLATIOON INCLUDE DUAL AXIS DRIVE CABLE FIBRE|Y
01|81830|7|2|OPTICS CONNECTORSEXTERNAL CABLES|Y
01|81830|7|3|TRAVEL AND LABOR|Y
01|81837|1|1|H010D15 O-1750 Howa Chuck Per Drawing|Y
01|81844|1|1|Ref:RGA#CUR-50581|Y
01|81844|1|2|Repair of CAT50U-AHC1.1/4-210-90 SN#ABH-08711|Y
01|81844|1|3|Making really loud noise.|Y
01|81844|9|1|Part: Key|Y
01|81859|1|1|*OPTIONAL* - On-Site Installation Support Includes:|N
01|81859|1|2|A service tech to come on site and help with table|N
01|81859|1|3|installation and parameter changes for one CNC180 table|N
01|81859|2|1|*OPTIONAL* - On-Site Installation Support Includes:|Y
01|81859|2|2|A service tech to come on site and help with table|Y
01|81859|2|3|installation and parameter changes for one CNC180 table|Y
01|81861|1|1|Complete kit = Tables/Cables/Interface Components|Y
01|81861|2|1|$1000 Tooling Certificate|Y
01|81863|1|1|Complete kit = 2 Tables/Cables/Interface Components|Y
01|81863|2|1|$1000 Tooling Certificate|Y
01|81865|2|1|*OPTIONAL* - On-Site Installation Support Includes:|Y
01|81865|2|2|A service tech to come on site and help with table|Y
01|81865|2|3|installation and parameter changes for one CNC180 table|Y
01|81891|1|1|RETENTION KNOB PROMO PRICING APPLIED ***|Y
01|81901|1|1|Tooling Certificate Number: 8595-1048-101317|Y
01|81910|1|1|Includes Haas Motors & Cable Set|Y
01|81910|2|1|Includes Haas Motors & Cable Set|Y
01|81912|1|1|Includes extra long cable set and Haas Motors|Y
01|81915|1|1|HSK125A-ER40-120  ER40 Collet Chuck X 120MM Gage|Y
01|81915|2|1|HSK125A-ER20-120  ER20 Collet Chuck  X 120MM Gage|Y
01|81915|3|1|HSK125A-ER32-120  ER32 Collet Chuck X 120mm Gage|Y
01|81915|4|1|HSK125A-C3/4-100  Milling Chuck 3/4 X 100mm gage|Y
01|81915|4|2|Quoted with standard spanner nut.|Y
01|81915|6|1|HSK125A-C3/4-100G Milling Chuck 3/4 X 100mm gage|Y
01|81915|6|2|Quoted with Hi-Speed Nut|Y
01|81929|1|1|Ref:RGA#CUR-50656|Y
01|81929|1|2|Repair of CAT50U-NX5-151 SN#LB-034|Y
01|81929|1|3|Send in for evaluation.|Y
01|81938|5|1|NCAT40-SF0625-6.30|Y
01|81938|6|1|NCAT40-SF0625-6.30|N
01|81938|7|1|NCAT40-SF0500-5.12CP|N
01|81938|12|1|NCAT40-SF0750-6.30CP|Y
01|81938|14|1|NCAT40-SF1000-4.00|Y
01|81940|1|1|MDSKN-6B|Y
01|81940|1|2|Non-returnable Non-cancelable|Y
01|81941|1|1|Ref:RGA#TOR-50673|Y
01|81941|1|2|Repair of NCAT40-C3/4-70U|Y
01|81941|1|3|Send in for evaluation.|Y
01|81941|8|1|Recommend replacement:List price $564.00 35%discount.|Y
01|81953|20|1|**Quote special core trade -in**|Y
01|81953|20|2|$3700 list price $ 2405.00  35% core trade in|Y
01|81953|20|3|discount (only one time special)|Y
01|81961|1|1|Custom Positioning Block for Okuma MB-4000H CAT40|Y
01|81961|1|2|per specs provided by customer to Tim Reeves|Y
01|81964|2|1|CORRECT STOP BLOCK NEEDED|Y
01|81964|2|2|APPLICATION MUST BE APPROVED. POSSIBLE CHILLER NEEDED|Y
01|81967|3|1|PART # TCE-95947-XXXXR|Y
01|81967|3|2|LENGTH TBD|Y
01|81967|4|1|PART # TCE-95951-XXXXR|Y
01|81967|4|2|LENGTH TBD|Y
01|81967|5|1|PART # TCE-95948-XXXXT|Y
01|81967|5|2|LENGTH TBD|Y
01|81967|6|1|PART # TCE-95952-XXXXT|Y
01|81967|6|2|LENGTH TBD|Y
01|81967|7|1|2 PCS FOR 5AX-2MT|Y
01|81967|7|2|4 PCS FOR 5AX-4MT|Y
01|81967|8|1|2 PCS FOR 5AX-2MT|Y
01|81967|8|2|4 PCS FOR 5AX-4MT|Y
01|81967|9|1|2 PCS FOR 5AX-2MT|Y
01|81967|9|2|4 PCS FOR 5AX-4MT|Y
01|81967|10|1|For 5AX-4MT 24V|Y
01|81967|11|1|FOR 5AX-4MT 110V|Y
01|81971|2|1|AIR TO EACH SPINDLE HAS NOT BEEN INCLUDED|Y
01|81971|2|2|MORE INFORMATION NEEDED FOR QUOTING.|Y
01|81971|3|1|PART # TCE-95947-XXXXR|Y
01|81971|3|2|LENGTH TBD|Y
01|81971|4|1|PART # TCE-95951-XXXXR|Y
01|81971|4|2|LENGTH TBD|Y
01|81971|5|1|PART # TCE-95948-XXXXT|Y
01|81971|5|2|LENGTH TBD|Y
01|81971|6|1|PART # TCE-95952-XXXXT|Y
01|81971|6|2|LENGTH TBD|Y
01|81971|11|1|For 5AX-4MT 24V|Y
01|81983|15|1|Retention Knob Promo pricing for any matching quantity|Y
01|81983|15|2|of CAT50 Taper Toolholders on same order.|Y
01|81984|1|1|Ref:RGA#LVR-50647|Y
01|81984|1|2|Repair of MNZ20-ER25Z-MS SN#A0009|Y
01|81984|1|3|Sending in live tool for rebuild.|Y
01|81984|2|1|Bearings Seals O-rings Collet Nuts other parts must|Y
01|81984|2|2|be replaced.|Y
01|81984|2|3|Labor is included.|Y
01|81990|1|1|Ref:RGA#LVR-50478|Y
01|81990|1|2|Repair of OKL15M-ER32X SN#A0662|Y
01|81990|1|3|Tool will turn but then stops.|Y
01|81990|2|1|Bearings Seals O-rings Collet Nut Spindle Minor|Y
01|81990|2|2|parts must be replaced.|Y
01|81990|2|3|Labor is included.|Y
01|81990|3|1|Ref:RGA#LVR-50478|Y
01|81990|3|2|Repair of OKL15M-ER32X SN#AL005|Y
01|81990|3|3|Tool will turn but then stops.|Y
01|81990|4|1|Bearings Seals O-rings Collet Nut Clutch|Y
01|81990|4|2|Minor Parts must be replaced.|Y
01|81990|4|3|Labor is included.|Y
01|82015|1|1|Direct Drive Rotary Table 250mm Diameter|Y
01|82015|1|2|Same Specifications as DD250F-150 S/N 1016|Y
01|82015|1|3|Direct Mount Cables are listed below.|Y
01|82016|1|1|Tooling Certificate Number:  25000-1039-092617RT|Y
01|82024|1|1|1pc purchase|Y
01|82024|3|1|3-5pcs|Y
01|82024|5|1|6pcs and over pricing.|Y
01|82024|20|1|HSK40E-SK13-75P|Y
01|82026|2|1|3J Round Collet 1.224 ID|Y
01|82026|2|2|Non-returnable Non-cancelable|Y
01|82026|2|3|Quoted as NET pricing 3 PC MIN|Y
01|82029|7|1|This is one time only test cut pricing. Once a PO has|Y
01|82029|7|2|been placed this item will be non-returnable and non-|Y
01|82029|7|3|refundable.|Y
01|82030|1|1|CAT50U-AF1-30-OH  Back Spot Facing Mill - Main Body|Y
01|82030|2|1|BF130-26-46-80C  Arbor for above|Y
01|82030|3|1|9BF130-26-46-80C-I  bit for above|Y
01|82030|4|1|AFC-15  insert tip for above|Y
01|82041|14|1|7/16 = 0.4375|Y
01|82041|23|1|for the 6mm|Y
01|82041|25|1|confirm the 300DA extension w/ 1/2 OD Shank|Y
01|82041|27|1|Requires set screws adjusted on ID Chips|Y
01|82053|1|1|BROTHER MACHINE - Coolant Through|Y
01|82053|3|1|FANUC /ROBODRILL MACHINE - Coolant Through|Y
01|82058|6|1|Retention Knob Promo Pricing Applied!|Y
01|82061|10|1|Custom Positioning Block per machine specs provided to|Y
01|82061|10|2|Tim Reeves from customer.|Y
01|82076|1|1|Cross from MD MNL0020732|Y
01|82076|2|1|Cross from MD MNL0011532|Y
01|82117|5|1|DISCONTINUED HOLDER. CANNOT BE ADDED TO THIS SF PACKAGE|Y
01|82127|1|1|Make a A10mm-P1.5 Slotted|Y
01|82128|1|1|*** Special 1 Time Replacement Pricing ***|Y
01|82128|1|2|NO Motor Covers/Motors/Cables - CASTING ONLY|Y
01|82128|1|3|Replacement Table for 5AX-130YA S/N 4973|Y
01|82128|1|4|Due to time constraints Lyndex-Nikken Recommends|Y
01|82128|1|5|Replacing Casting due to extensive damage|Y
01|82128|1|6|with Machine Crash|Y
01|82128|2|1|Line item for Service Tech to swap tables|Y
01|82128|2|2|Using existing Motor Covers/Motor/Cables as were|Y
01|82128|2|3|Not effected in table crash.|Y
01|82128|2|4|Service call total amount will be determined after|Y
01|82128|2|5|completion|Y
01|82135|1|1|#4 Draw Screw for H037M8 Chuck|Y
01|82135|1|2|Non-returnable Non-cancelable Quoted as NET pricing|Y
01|82135|2|1|#5 Retainer for H037M8 Chuck|Y
01|82135|2|2|Non-returnable Non-cancelable Quoted as NET pricing|Y
01|82159|1|1|Repair of 5AX-500FA-APC s/n: 1016 TILT AXIS ONLY|Y
01|82159|1|2|Please note this is an estimate only.  Final pricing|Y
01|82159|1|3|will be determined upon receipt and evaluation of the|Y
01|82159|1|4|table.|Y
01|82162|1|1|*** Special 1 Time Order Pricing ***|Y
01|82162|1|2|NO Motor Covers/Motors/Cables - CASTING ONLY|Y
01|82162|1|3|Replacement Table for 5AX-130YA S/N 4973|Y
01|82162|1|4|Due to time constraints Lyndex-Nikken Recommends|Y
01|82162|1|5|Replacing Casting due to extensive damage|Y
01|82162|1|6|with Machine Crash|Y
01|82162|2|1|Line item for Service Tech to swap tables|Y
01|82162|2|2|Using existing Motor Covers/Motor/Cables as were|Y
01|82162|2|3|Not effected in table crash.|Y
01|82162|2|4|Service call total amount will be determined after|Y
01|82162|2|5|completion|Y
01|82163|1|1|MZMP46-ER25Z-MD-C|Y
01|82163|1|2|Mazak Live Z-Axis ER25 Main Dual(MD)1+1|Y
01|82163|1|3|Internal Coolant VDI40 D=40mm: L=60mm:|Y
01|82163|1|4|Working Height 160/170mm 1:1 Gear Ratio:|Y
01|82163|1|5|max coolant 1015 PSI:6500 RPM 10Nm torque per spindle|Y
01|82165|1|1|Repair of 5AX-500FA-APC s/n: 1016 TILT & ROTARY AXIS|Y
01|82165|1|2|Please note this is an estimate only.  Final pricing|Y
01|82165|1|3|will be determined upon receipt and evaluation of the|Y
01|82165|1|4|table.|Y
01|82179|2|1|100TG-PULL Discontinued this is the ALT part#|Y
01|82184|1|1|Item is a special which is non cancellable and|Y
01|82184|1|2|is non returnable once order is placed|Y
01|82195|1|1|Shrink Fit Unit Only|Y
01|82195|4|1|Unit includes accessories and 10 standard tool holders|Y
01|82195|4|2|from list|Y
01|82195|5|1|Unit includes accessories and 10 standard tool holders|Y
01|82195|5|2|from list|Y
01|82206|1|1|w/ PS-N63AE Installed at factory prior to shipping.|Y
01|82210|1|1|New Unit|Y
01|82210|2|1|Discount reflects demo machine from Nick Mazis.|Y
01|82210|2|2|Nick can deliver this machine.|Y
01|82225|1|1|Set of two tables servomotor included.|Y
01|82225|1|2|No external cables. No interface cables. No amplifiers|Y
01|82225|1|3|No Junction box. No B-Axis Cable.|Y
01|82226|1|1|Quoted as 1-50 pcs.|Y
01|82226|2|1|Quoutes as 51-100 pcs.|Y
01|82239|1|1|TAT-170 s/n: 22146B Brake system has problems.|Y
01|82239|1|2|Reference RGA# TAR-50707|Y
01|82258|6|1|Includes: drive amp bulk head cable set external|Y
01|82258|6|2|cable set fiber optic cable communication cable|Y
01|82258|6|3|travel and labor for installation.|Y
01|82268|1|1|3-4 DAYS DELIVERY ARO|Y
01|82268|1|2|MUST PREP TABLE SAME AS s/n 1354|Y
01|82281|1|1|Minimum order 3 pieces quoted at net price.|Y
01|82284|1|1|Table only no drive units no b-axis cable|Y
01|82302|1|1|Ref:RGA#TOR-50645|Y
01|82302|1|2|Repair of F90-C1.1/4AW-82|Y
01|82302|1|3|Snap ring is broken.|Y
01|82316|1|1|H023M12 chuck w/ A2-6 mount for Haas ST-30Y Turn Center|Y
01|82316|2|1|H023M12 Chuck w/ A2-8 mount for Yama Seiki GA3300|Y
01|82316|3|1|H023M15 w/ A2-11 mount for Yama Seiki GA3600|Y
01|82319|5|1|For price reference|Y
01|82319|7|1|For price reference|Y
01|82319|9|1|For price reference|Y
01|82322|1|1|Includes: 1-CNCZ180LSABR table with cable set and|Y
01|82322|1|2|drive unit for Brother TC-R2B.|Y
01|82322|2|1|Includes: 2-CNCZ180LSABR tables with cable sets drive|Y
01|82322|2|2|units sheet metal and junction box for TC-R2B.|Y
01|82358|7|1|This cost reflects the difference in standard nut price|Y
01|82358|7|2|Swap standard nuts with coolant nuts at LN prior to|Y
01|82358|7|3|shipping.|Y
01|82359|4|1|HSK40E-C3/4-XXX|Y
01|82364|2|1|Modification Charge for Draw Nut per customer machine|Y
01|82364|2|2|specs|Y
01|82367|1|1|These items are non standard stock and considered|Y
01|82367|1|2|special.  Once an order is placed it may not be|Y
01|82367|1|3|cancelled or returned.|Y
01|82367|2|1|These items are non standard stock and considered|Y
01|82367|2|2|special.  Once an order is placed it may not be|Y
01|82367|2|3|cancelled or returned.|Y
01|82367|3|1|Coolant port version available|Y
01|82367|13|1|Coolant port version available|Y
01|82367|13|2|These items are non standard stock and considered|Y
01|82367|13|3|special.  Once an order is placed it may not be|Y
01|82367|13|4|cancelled or returned.|Y
01|82367|16|1|Coolant port version available|Y
01|82367|16|2|These items are non standard stock and considered|Y
01|82367|16|3|special.  Once an order is placed it may not be|Y
01|82367|16|4|cancelled or returned.|Y
01|82367|18|1|These items are non standard stock and considered|Y
01|82367|18|2|special.  Once an order is placed it may not be|Y
01|82367|18|3|cancelled or returned.|Y
01|82377|1|1|BT30 1in End Mill 115mm GL  B3006-1000-115|Y
01|82377|1|2|ETA 12-14 WKS 5PC MIN|Y
01|82377|1|3|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|82380|1|1|Only 2pcs left of balanceable - quoted below balance of|Y
01|82380|1|2|8 pcs with longer gage|Y
01|82382|3|1|*Hot deal Promotion item*|Y
01|82388|2|1|40 Taper center socket for manual draw bolt.|Y
01|82389|4|1|Installation includes:External cable set and parameter|Y
01|82389|4|2|changes. We will use the existing drive unit.|Y
01|82389|10|1|Installation includes: Drive unit bulkhead cables|Y
01|82389|10|2|external cables parameter changes service time and|Y
01|82389|10|3|travel.|Y
01|82390|1|1|NC5-63-C16-120 w/ PS-868 installed at factory|Y
01|82394|1|1|Replacement Motion Pack for CNCZ201 S/N 8444H|Y
01|82394|1|2|with A21 Controller|Y
01|82397|1|1|Delivery ETA 1-2 wks. ARO|Y
01|82399|1|1|Net price quoted and please make sure tap shank is|Y
01|82399|1|2|.318 and drive square is .238.|Y
01|82421|11|1|BMT55-ER32Z-60 BMT55 ER32 Z-AXIS Center line L=60|Y
01|82421|11|2|External coolantDirection of rotation is reversal.|Y
01|82421|11|3|Gear Ratio 1:1 6500 rpm max torque M=70Nm|Y
01|82421|11|4|Quoted at net price|Y
01|82421|13|1|BMT55-ER32Z-ICE-60  BMT55 ER32 Z-AXIS Center Line|Y
01|82421|13|2|L1-60mm External or internal coolantcan run Dry|Y
01|82421|13|3|Max coolant pressure 1015 PSI Direction of rotation|Y
01|82421|13|4|reversalGear Ratio 1:1 6500 rpm max torque M=70Nm|Y
01|82421|13|5|Quoted at net price.|Y
01|82445|1|1|C5036-0375-8.00-JS  CAT50 3/8 EMH 8 GL w/Jet Slots|Y
01|82445|2|1|Jest Slot Modification of above holder.|Y
01|82452|3|1|Please Note: This tool is non standard stock. Once|Y
01|82452|3|2|a purchase order is placed it cannot be cancelled or|Y
01|82452|3|3|returned.|Y
01|82458|3|1|2 Stk 1 ETA 12/19 bal 12 wks ARO|Y
01|82465|5|1|12' O.D PULL DOWN CHUCK|Y
01|82465|6|1|12 STANDARD O.D CHUCK|Y
01|82465|7|1|INCLUDING CYLINDER ADAPTER CYLINDER CONNECTOR AND|Y
01|82465|7|2|ANTI-ROTATION BRACKET|Y
01|82465|9|1|INCLUDES DRIVE FIBRE OPTIC CABLES SERVO MOTOR|Y
01|82465|9|2|AMPLIFIER EXTERNAL CABLES TRAVEL INSTRIUCTION|Y
01|82465|9|3|LABOR|Y
01|82466|3|1|CABLE SET DUAL AXIS|Y
01|82466|4|1|SERVO MOTORS FOR TWO AXIS|Y
01|82466|7|1|UPON RETURN AND INSPECTION OF CNCZ-100-4W RETURNED|Y
01|82466|7|2|WITH TAILSTOCK AND COLLET CHUCKS|Y
01|82466|7|3|THIS FEE WILL APPLY|Y
01|82466|9|1|TOOL CERTIFICATE AT LIST PRICE|Y
01|82469|17|1|quoted as NET pricing non-returnable non-cancelable|Y
01|82469|26|1|quoted as NET pricing non-returnable non-cancelable|Y
01|82469|31|1|quoted as NET pricing non-returnable non-cancelable|Y
01|82469|31|2|CCK3/4-9|Y
01|82469|32|1|quoted as NET pricing non-returnable non-cancelable|Y
01|82469|32|2|CKFN20(3/4)-9C|Y
01|82476|2|1|NB4016-0500-4.00 2Lock TaperPlus NBT40 1/2 End Mill|Y
01|82476|2|2|Holder 4.0 Gage|Y
01|82476|4|1|NB4016-0625-4.00  2Lock TaperPlus NBT40 5/8 End Mill|Y
01|82476|4|2|Holder.|Y
01|82476|5|1|NB4016-0625-4.00 2Lock TaperPlus NBT40 5/8 End Mill|Y
01|82476|5|2|Holder 4.0 Gage|Y
01|82476|7|1|NB4016-1000-6.00 2Lock TaperPlus NBT40 1in End Mill|Y
01|82476|7|2|Holder|Y
01|82476|9|1|NB4016-1250-6.00  2Lock TaperPlus NBT40 1.1/4 End Mill|Y
01|82476|9|2|Holder 6.0 Gage|Y
01|82476|12|1|NB4016-1250-6.00 2Lock TaperPlus NBT40 1.1/4 End Mill|Y
01|82476|12|2|Holder 6.0 Gage|Y
01|82476|15|1|NB4017-0020-4.00 2Lock TaperPlus NBT40 ER20 HiTorq|Y
01|82476|15|2|Collet Chuck|Y
01|82476|16|1|NB4007-0020-6.00 2Lock TaperPlus NBT40 ER20 HiTorq|Y
01|82476|16|2|Collet Chuck|Y
01|82476|18|1|NB4017-0025-4.00 2Lock TaperPlus NBT40 ER25 HiTorq|Y
01|82476|18|2|Collet Chuck|Y
01|82476|19|1|NB4017-0025-6.00 2Lock TaperPlus NBT40 ER20 HiTorq|Y
01|82476|19|2|Collet Chuck 6.0 Gage Length|Y
01|82476|21|1|NB4027-0020-6.00 NB4017-0020-4.00 2Lock TaperPlus|Y
01|82476|21|2|Collet Chuck 6.0 Gage|Y
01|82476|24|1|NB4017-0025-4.00 2Lock TaperPlus NBT40 ER25 HiTorq|Y
01|82476|24|2|Collet Chuck 4.0 Gage|Y
01|82476|26|1|NB4027-0025-6.00 2Lock TaperPlus NBT40 ER25 HiTorq|Y
01|82476|26|2|Collet Chuck 6.0 Gage|Y
01|82477|3|1|CCK3/4-9|Y
01|82477|3|2|QUOTED AS NET PRICINGNON-RETURNABLENON-CANCELABLE|Y
01|82477|4|1|CKFN20(3/4)-9C|Y
01|82477|4|2|QUOTED AS NET PRICINGNON-RETURNABLENON-CANCELABLE|Y
01|82477|8|1|QUOTED AS NET PRICINGNON-RETURNABLENON-CANCELABLE|Y
01|82477|9|1|QUOTED AS NET PRICINGNON-RETURNABLENON-CANCELABLE|Y
01|82495|2|1|Could use a sleeve in a 1.1/2 to a 1.1/4|Y
01|82495|2|2|Global CNC Part# CNC 86-43Z|N
01|82512|2|1|Item is not standard stock items and considered special|Y
01|82512|2|2|Once a purchase order is placed item can can not be|Y
01|82512|2|3|cancelled or returned|Y
01|82512|4|1|Item is not standard stock items and considered special|Y
01|82512|4|2|Once a purchase order is placed item can can not be|Y
01|82512|4|3|cancelled or returned|Y
01|82512|5|1|Item is not standard stock items and considered special|Y
01|82512|5|2|Once a purchase order is placed item can can not be|Y
01|82512|5|3|cancelled or returned|Y
01|82537|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|2|2|**HOT DEALS** DIST Net $65|Y
01|82537|4|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|4|2|**HOT DEALS** DIST Net $103|Y
01|82537|8|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|8|2|**HOT DEALS** DIST Net $90|Y
01|82537|14|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|14|2|**HOT DEALS** DIST Net $77|Y
01|82537|16|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|16|2|**HOT DEALS** DIST Net $77|Y
01|82537|21|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|21|2|**HOT DEALS** DIST Net $73|Y
01|82537|24|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|24|2|**HOT DEALS** DIST Net $72|Y
01|82537|26|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|26|2|**HOT DEALS** DIST Net $58|Y
01|82537|28|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|28|2|**HOT DEALS** DIST Net $65|Y
01|82537|33|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|33|2|**HOT DEALS** DIST Net $86|Y
01|82537|33|3|2.50 Gauge Length|Y
01|82537|34|1|** Closeout Promotion! All sales are FINAL!**|Y
01|82537|34|2|**HOT DEALS** DIST Net $149|Y
01|82537|34|3|4.00 Gauge Length|Y
01|82538|2|1|I have the reg CAT40 1 holder in standard type availbl|Y
01|82543|1|1|KM1.1/4-0.7550|Y
01|82543|1|2|Special KM 1.1/4 milling chuck collet on size 0.7550|Y
01|82543|2|1|KM1.1/4-0.7920|Y
01|82543|2|2|Special KM1.1/4 milling chuck collet on size 0.7920|Y
01|82543|3|1|KM1.1/4-0.9890|Y
01|82543|3|2|Special KM1.1/4 milling chuck collet on size 0.9890|Y
01|82543|4|1|KM1.1/4-1.005|Y
01|82543|4|2|Special KM1.1/4 milling chuck collet on size 1.005|Y
01|82543|5|1|KM2-1.255|Y
01|82543|5|2|Special KM2 milling chuck collet on size 1.255|Y
01|82543|6|1|KM2-1.265|Y
01|82543|6|2|Special KM2 milling chuck collet on size 1.265|Y
01|82544|1|1|EXW Mundelein IL Prepaid upon Proforma|Y
01|82550|1|1|Ref:RGA#LVR-50674|Y
01|82550|1|2|Repair of MNZ20-ER20X SN#A0367|Y
01|82550|2|1|Bearings O-rings Seals Collet Nut must be replaced.|Y
01|82550|2|2|Labor is included.|Y
01|82550|3|1|Ref: RGA#LVR-50674|Y
01|82550|3|2|Repair of MNZ20-ER20X SN#A0358|Y
01|82550|4|1|Bearing O-rings Seal Collet Nut must be replaced.|Y
01|82550|4|2|Labor is included.|Y
01|82554|1|1|Returned customer table ordered in error.|Y
01|82562|2|1|Same as above but for 1-1/4 Dia.|Y
01|82562|3|1|These are all considered specials which are not|Y
01|82562|3|2|returnable/cancellable|Y
01|82566|1|1|Delivery: 4-pcs 1st week January-Bal 3 pcs 1st week|Y
01|82566|1|2|March.|Y
01|82578|1|1|A5/8-11SL will advise P&D|Y
01|82584|1|1|net price. special size. non cancelable upon po|Y
01|82595|1|1|Delivery: 4-pcs 1st week January-Bal 3 pcs 1st week|Y
01|82595|1|2|March.|Y
01|82609|5|1|External cable sets.|Y
01|82622|1|1|Quoted as NET Pricing Non-returnable Non-cancelable|Y
01|82625|1|1|Tooling Certificate Number:  25000-1039-092617RT|Y
01|82625|2|1|Quoted as NET pricing Non-cancelable Non-returnable|Y
01|82625|3|1|Quoted as NET pricing Non-cancelable Non-returnable|Y
01|82625|4|1|Quoted as NET pricing Non-cancelable Non-returnable|Y
01|82625|5|1|Quoted as NET pricing Non-cancelable Non-returnable|Y
01|82625|6|1|Quoted as NET pricing Non-cancelable Non-returnable|Y
01|82638|6|1|$5.00 retention knob promo per holder purchased 3|Y
01|82638|6|2|holders=3 knobs at promo price|Y
01|82650|3|1|BT40-MMC8-150|Y
01|82669|1|1|1TH-01656 [Back cover D19.05]|Y
01|82669|1|2|0H-KFM050012 [Screw M5'L12]|Y
01|82671|1|1|3J Round Collet 1.122 Diameter|Y
01|82671|1|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|82683|1|1|Quote for complete overhaul of table.|Y
01|82683|28|1|TILT AXIS|Y
01|82683|30|1|ROTARY AXIS|Y
01|82683|39|1|PAINT ON TABLE BODY ONLY|Y
01|82691|1|1|Repair of CNC200 s/n: 3135|Y
01|82691|1|2|Reference RGA# TAR-50739|Y
01|82697|1|1|Tooling Certificate Number:  5385-1053-102017|Y
01|82711|1|1|Ref:RGA#LVR-50485|Y
01|82711|1|2|Repair of 167514 SN#8248 01|Y
01|82711|1|3|Send in for evaluation.|Y
01|82711|2|1|Bearings seals and o-rings must be replaced.|Y
01|82711|2|2|Labor is included.|Y
01|82716|3|1|FLAT RATE|Y
01|82716|5|1|FLAT RATE|Y
01|82731|1|1|Upgrade to BIS8 motors|Y
01|82731|2|1|Installation includes old table removal new table|Y
01|82731|2|2|placement parameter changes & service time & travel|Y
01|82731|3|1|s/n:  4191|Y
01|82731|4|1|s/n:  4197|Y
01|82731|5|1|s/n:  5304|Y
01|82731|6|1|s/n:  5305|Y
01|82739|1|1|Service as described in report for  S/N 4972 QUA-50827|Y
01|82739|1|2|Includes service call to reinstall table|Y
01|82755|20|1|*can be used with non-coolant through application and|Y
01|82755|20|2|coolant along the flutes|Y
01|82755|22|1|*for 2 face mill|Y
01|82755|23|1|*for 4 face mill|Y
01|82756|1|1|Repair of CAT40-NPU8-80U|Y
01|82756|1|2|Reference RGA# TOR-50795|Y
01|82756|3|1|Labor charge is typically $110/hr.  Technician will|Y
01|82756|3|2|only need 30mins to complete this repair.|Y
01|82756|3|3|Total repair price of CAT40-NPU8-80U: $355.35 net|Y
01|82756|5|1|Also quoting replacement holder as it is more cost|Y
01|82756|5|2|effective to purchase a replacement.  However please|Y
01|82756|5|3|note this is currently on back order.  Item should|Y
01|82756|5|4|be available by Mid-November.|Y
01|82756|7|1|Repair of CAT40-NPU13-105U|Y
01|82756|10|1|Labor charge is typically $110/hr.  Technician will|Y
01|82756|10|2|only need 30mins to complete this repair.|Y
01|82756|10|3|Total repair price of CAT40-NPU13-105U: $133.30 net|Y
01|82769|2|1|Lead 10-12 weeks|Y
01|82772|1|1|Left Hand Rotary Table for Right Table mount with|Y
01|82772|1|2|Rotary Table Motor located to back of machine.|Y
01|82772|1|3|Machine: Awea AF-1000 Serial No.: 7089|Y
01|82772|2|1|Complete install including Cables Servoamp Control|Y
01|82772|2|2|Parameters and 1/2 day onsite technician|Y
01|82772|2|3|Note: Control must be 4th axis ready with ladder|Y
01|82772|2|4|prior to scheduling installation|Y
01|82772|5|1|Cable set for external and internal cabinet wiring|Y
01|82772|5|2|Note: This option is for Geoteck install.|Y
01|82772|5|3|Please omit line 2 when selecting this option.|Y
01|82772|6|1|No cranking side swing tailstock - Cam operated|Y
01|82772|6|2|See page 50 in Nikken Rotary Catalog|Y
01|82781|4|1|EXTERNAL CABLE SET|Y
01|82782|1|1|HSK100A-8-4.00|Y
01|82782|2|1|HSK100A-8-8.00|Y
01|82782|3|1|HSK100A-12-4.00|Y
01|82782|4|1|HSK100A-12-8.00|Y
01|82782|5|1|HSK100A-16-4.00|Y
01|82782|6|1|HSK100A-16-8.00|Y
01|82782|7|1|HSK100A-20-4.00|Y
01|82782|8|1|HSK100A-20-8.00|Y
01|82802|2|1|Scale Kit|Y
01|82802|3|1|Scale Kit Heidenhain RON285|Y
01|82812|1|1|Repair of customer's BT40-UMT200W|Y
01|82812|1|2|Reference RGA# TOR-50609|Y
01|82813|1|1|Repair of HSK100A-C3/4-115G|Y
01|82813|1|2|Reference RGA# TOR-50813|Y
01|82813|9|1|Quoting replacement for unrepairable unit sent in|Y
01|82813|9|2|for evaluation on RGA# TOR-50813|Y
01|82813|9|3|Original unit has a collapsed bore and is un-repairable|Y
01|82815|1|1|PROHO|Y
01|82823|2|1|ETA 1-2 WKS|Y
01|82828|2|1|Lead Time TBD|Y
01|82834|1|1|Ref:RGA#TAR-50774|Y
01|82834|1|2|Repair of 5AX-130YS SN#4973|Y
01|82834|1|3|Table was crashed.|Y
01|82835|5|1|12' O.D PULL DOWN CHUCK|Y
01|82835|6|1|12 STANDARD O.D CHUCK|Y
01|82835|9|1|INCLUDING CYLINDER ADAPTER CYLINDER CONNECTOR AND|Y
01|82835|9|2|ANTI-ROTATION BRACKET|Y
01|82835|11|1|INCLUDES DRIVE FIBRE OPTIC CABLES SERVO MOTOR|Y
01|82835|11|2|AMPLIFIER EXTERNAL CABLES TRAVEL INSTRIUCTION|Y
01|82835|11|3|LABOR|Y
01|82835|13|1|INCLUDES A22 SIZE MOTOR AND LONGER MOTOR COVER|Y
01|82835|15|1|INCLUDES A22 SIZE MOTOR COVER AND LONGER MOTOR COVER|Y
01|82836|1|1|Collet Range 1/32 - 13/32|Y
01|82836|2|1|Collet Range 1/16 - 1/2|Y
01|82836|3|1|Collet Range 1/16 - 5/8|Y
01|82836|4|1|Collet Range 1/8 - 25/32|Y
01|82836|10|1|Collet Range .06 - .39|Y
01|82836|11|1|Collet Range .10 - .629|Y
01|82836|12|1|Collet Range .629 - 1.00|Y
01|82836|13|1|Collet Range .027 - .236|Y
01|82836|14|1|27 pc. Set .108 - .629|Y
01|82837|1|1|HFO to supply Motor and Cables|Y
01|82842|1|1|NBT40-C16-60G|Y
01|82842|1|2|Special pricing for first time use|Y
01|82845|1|1|Ref:RGA#TOR-50719|Y
01|82845|1|2|Repair of CAT40-UMT200UW|Y
01|82849|1|1|Ref:RGA#TOR-50743|Y
01|82849|1|2|Repair of CAT40-NPU13-105U|Y
01|82849|1|3|Send in for evaluation.|Y
01|82849|5|1|Replacement tool list price $424.00 discount 35%|Y
01|82849|5|2|$275.60.|Y
01|82852|1|1|NBT40-C16-60G|Y
01|82852|13|1|NBT40-C16-60|Y
01|82852|14|1|NBT40-C16-90|Y
01|82852|15|1|NBT40-C16-90G|Y
01|82852|21|1|NBT40-C12-65|Y
01|82852|22|1|NBT40-C12-65G|Y
01|82852|23|1|NBT40-C12-90|Y
01|82852|24|1|NBT40-C12-90G|Y
01|82852|31|1|NBT40-MDSK13-65|Y
01|82852|32|1|NBT40-MDSK13-65P|Y
01|82852|33|1|NBT40-MDSK13-75|Y
01|82852|34|1|NBT40-MDSK13-75P|Y
01|82852|35|1|NBT40-MDSK13-90|Y
01|82852|36|1|NBT40-MDSK13-90P|Y
01|82852|42|1|NBT40-SK13C-60|Y
01|82852|43|1|NBT40-SK13C-60P|Y
01|82852|44|1|NBT40-SK13C-75|Y
01|82852|45|1|NBT40-SK13C-75P|Y
01|82852|46|1|NBT40-SK13C-90|Y
01|82852|47|1|NBT40-SK13C-90P|Y
01|82855|1|1|Ref:RGA#TOR-50725|Y
01|82855|1|2|Repair of MCAT50-C3/4-200U|Y
01|82855|1|3|Send in for evaluation.|Y
01|82857|1|1|A5/8-11SL will advise P&D|Y
01|82862|1|1|Ref:RGA#TOR-50756|Y
01|82862|1|2|Repair of HP-150|Y
01|82862|1|3|Cylinder part is loose.|Y
01|82862|2|1|Option #2|Y
01|82862|2|2|Secure cylinder to base and replace slide head.|Y
01|82862|2|3|Height: 150.057 (.057mm out of spec.)|Y
01|82862|5|1|Option#1|Y
01|82862|5|2|Only secure the cylinder to the base.|Y
01|82862|5|3|Includes Inspection & Labor fee.|Y
01|82862|5|4|Height: 149.881 (.119mm out of spec.)|Y
01|82880|1|1|Ref:RGA#TAR-50778|Y
01|82880|1|2|Repair of CNC180FA SN#6038|Y
01|82880|1|3|Send in for evaluation.|Y
01|82884|1|1|*to hold 3mm|Y
01|82884|2|1|*to hold 6mm|Y
01|82893|1|1|This holder is quoted at net price.|Y
01|82894|1|1|This holder is quoted at net price.|Y
01|82897|1|1|Case wrenches and manual included|Y
01|82897|1|2|70 Nm Torque Max RPM 6500 Gear Ratio 1:1|Y
01|82897|1|3|Quick Change Angle Head|Y
01|82897|5|1|Storage Case Wrenches and manual included|Y
01|82897|5|2|50 Nm Torque Max RPM 8000 Gear Ratio 1:1|Y
01|82927|1|1|Upgrade to BIS8 motors|Y
01|82927|2|1|Installation includes old table removal new table|Y
01|82927|2|2|placement parameter changes & service time & travel|Y
01|82927|3|1|s/n:  4191|Y
01|82927|4|1|s/n:  4197|Y
01|82927|5|1|s/n:  5304|Y
01|82927|6|1|s/n:  5305|Y
01|82945|3|1|Closet to the 70mm GL|N
01|82946|1|1|K32-SK16-95 32mm SK16 Slim Chuck Straight Shank Ext|Y
01|82946|1|2|Quoted at Net price.|Y
01|82951|2|1|Lead time 4-5 weeks|Y
01|82957|1|1|Howa  HW-10-HS-Z202|Y
01|82957|1|2|Replacement for Howa H027M10 R-431|Y
01|82967|12|1|COMMUNICATIONS CABLE  A660-2005-T626/L150R0A|Y
01|82986|2|1|Net price for modification of 2-hole Din.|Y
01|83000|1|1|8 Tilting Rotary Table 200mm|Y
01|83000|1|2|W/Fanuc Motors|Y
01|83011|1|1|With Makino Pins|Y
01|83011|1|2|Net price reflects a purchase order of 1~9 pieces.|Y
01|83011|1|3|HSK63F/LPM-MMC12C-129-AA|Y
01|83011|2|1|Net price reflects a purchase order of 10+ pieces.|Y
01|83011|2|2|With Makino Pins|Y
01|83011|2|3|HSK63F/LPM-MMC12C-129-AA|Y
01|83019|12|1|Modification to plug DIN holes|Y
01|83019|13|1|Modification to plug DIN holes|Y
01|83025|2|1|Unit price.|Y
01|83032|6|1|close to 2.76 GL|N
01|83032|7|1|closet to 4 GL|N
01|83032|15|1|closet to 3.75 GL|N
01|83032|19|1|need 1/8-1 x 1/32|N
01|83032|20|1|closet to 1.75 Gl|N
01|83041|1|1|2-4pcs qty break pricing|Y
01|83048|1|1|HSK50A-HC10-85 (92.05.036.003)|Y
01|83048|1|2|HSK50A 10mm Hyd Chuck w/85mm GL|Y
01|83048|2|1|HSK50A-HC10-105 (Special GL of above)|Y
01|83048|2|2|HSK50A 10mm Hyd Chuck w/ 105mm GL|Y
01|83048|3|1|HSK50A-HC16-95 (92.05.036.006)|Y
01|83048|3|2|HSK50A 16mm Hyd Chuck w/ 95mm GL|Y
01|83048|4|1|HSK50A-HC16-105 (Special GL of above)|Y
01|83048|4|2|HSK50A 16mm Hyd Chuck w/ 105mm GL|Y
01|83048|5|1|HSK50A-HC20-100 (92.05.036.008)|Y
01|83048|5|2|HSK50A 20mm Hyd Chuck w/ 100mm GL|Y
01|83048|6|1|HSK50A-HC20-120 (Special GL of above)|Y
01|83048|6|2|HSK50A 20mm Hyd Chuck w/ 120mm GL|Y
01|83048|7|1|HSK63A-HC20-100 (93.05.036.016)|Y
01|83048|7|2|HSK63A 20mm Hyd Chuck w/ 100mm GL|Y
01|83048|8|1|HSK63A-HC20-120 (Special GL of above)|Y
01|83048|8|2|HSK63A 20mm Hyd Chuck w/ 120mm GL|Y
01|83050|2|1|Qty Break Price for 2 to 3 pcs.|Y
01|83050|3|1|Qty Break Price for 4 to 5 pcs.|Y
01|83069|1|1|Ref:RGA#TAR-50685|Y
01|83069|1|2|Repair of 5AX-2MT-105-120FA-M SN#8088|Y
01|83069|1|3|Send in for evaluation.|Y
01|83072|1|1|Back ordered lead 8-10 weeks|Y
01|83082|1|1|Above Charge to convert table to have Air/Hyd Booster|Y
01|83082|1|2|Brake Setup on Rotary and Tilting Axis|Y
01|83082|3|1|Item List to have 5C Collet fixture with Hyd Clamping|Y
01|83082|3|2|Below items are part of package.|Y
01|83087|3|1|Spindle drawing must be provided|Y
01|83087|8|1|added per john's call in case they want to go this opt'|Y
01|83093|11|1|Substitute for SC50X68X9|Y
01|83093|21|1|Substitute for SC15X35X8|Y
01|83093|22|1|Substitute for SC25X38X7|Y
01|83101|1|1|1 pc stk at factory 1-2 weeks|Y
01|83101|1|2|bal of 2 pcs 11-12 wks ARO|Y
01|83115|1|1|CNC302OSP-M CNC ROTARY TABLE|Y
01|83115|1|2|will use the BL-MC50J-30T Servo Motor|Y
01|83123|1|1|6-pcs stock>>Bal 3-4 Weeks|Y
01|83123|5|1|Please Note: This tool is non standard stock. Once a|Y
01|83123|5|2|purchase order is placed it cannot be cancelled or|Y
01|83123|5|3|returned.|Y
01|83123|6|1|Please Note: This tool is non standard stock. Once a|Y
01|83123|6|2|purchase order is placed it cannot be cancelled or|Y
01|83123|6|3|returned.|Y
01|83124|14|1|H100A-SF0375-6.30 11pcs in stock|Y
01|83126|14|1|H100A-SF0375-6.30 11pcs in stock|Y
01|83128|1|1|Desc: CAT50 1in Milling Chuck ID chip hole|Y
01|83128|1|2|Spec: 5.314(L) 3.149(L1) 2.342(D) Speed: 8000|Y
01|83128|1|3|RPM TIR: 0.0002|Y
01|83156|4|1|Install Kit|Y
01|83163|5|1|NCAT50-SF10-6.30  TaperPlus CAT50 10mm ID SF holder|Y
01|83163|5|2|Pricing based on a 1pc purchase quantity|Y
01|83163|6|1|NCAT50-SF10-6.30  TaperPlus CAT50 10mm ID SF holder|Y
01|83163|6|2|Pricing based on a 5pc purchase quantity|Y
01|83163|7|1|NCAT50-SF10-6.30  TaperPlus CAT50 10mm ID SF holder|Y
01|83163|7|2|Pricing based on a 10pc purchase quantity|Y
01|83163|9|1|NCAT50-SF12-6.30  TaperPlus CAT50 12mm ID SF holder|Y
01|83163|9|2|Pricing based on a 1pc purchase quantity|Y
01|83163|10|1|NCAT50-SF12-6.30  TaperPlus CAT50 12mm ID SF holder|Y
01|83163|10|2|Pricing based on a 5pc purchase quantity|Y
01|83163|11|1|NCAT50-SF12-6.30  TaperPlus CAT50 12mm ID SF holder|Y
01|83163|11|2|Pricing based on a 10pc purchase quantity|Y
01|83163|13|1|NCAT50-SF16-6.30  TaperPlus CAT50 16mm ID SF holder|Y
01|83163|13|2|Pricing based on a 1pc purchase quantity|Y
01|83163|14|1|NCAT50-SF16-6.30  TaperPlus CAT50 16mm ID SF holder|Y
01|83163|14|2|Pricing based on a 5pc purchase quantity|Y
01|83163|15|1|NCAT50-SF16-6.30  TaperPlus CAT50 16mm ID SF holder|Y
01|83163|15|2|Pricing based on a 10pc purchase quantity|Y
01|83177|3|1|C6-SK10-120-J|Y
01|83177|3|2|Polygon C6 SK6 Slim Chuck Jet Slots|Y
01|83183|1|1|Ref:TOR-50848|Y
01|83183|1|2|Repair of ZERO-SET4|Y
01|83183|1|3|Ran drill into it and need to evaluate.|Y
01|83192|1|1|Ref:TOR_-50814|Y
01|83192|1|2|Repair of PF-2|Y
01|83192|1|3|Send in for repair.|Y
01|83192|2|1|Need to tight stylusre-calibrate|Y
01|83193|1|1|Conversion of NSVZ180LAA21 to NSVZ180LYA-M (Haas Spec)|Y
01|83193|1|2|$6500 Conversion Cost - $2000 Credit A21 = $4500|Y
01|83193|1|3|Delivery is approx 4-6 Weeks upon reciept of table|Y
01|83193|1|4|at Lyndex to determine custom parts needed.|Y
01|83193|1|5|Installation of table is also included in the above|Y
01|83193|2|1|Using existing setup on Haas Control|Y
01|83193|2|2|Customer will need 1 M-Code for start/finish signal|Y
01|83193|2|3|Will include tech labor and hardware|Y
01|83200|1|1|Ref:RGA#LVR-50766|Y
01|83200|1|2|Repair of T32137A03 SN#A0222|Y
01|83200|1|3|Tool is seizing up need to evaluate.|Y
01|83200|2|1|Bearings seals o-ring and minor parts need to replace|Y
01|83200|2|2|Spindle shaft has big damage and need to replace.|Y
01|83200|2|3|Labor is included.|Y
01|83214|1|1|NSVX500AA21-1800W Rotary Hirth Coupling Index|Y
01|83214|1|2|Alpha21 External Controller|Y
01|83240|1|1|To be DIN modified to be CAT40-SZF10F-120U|Y
01|83245|1|1|Qty 1-9pcs|Y
01|83245|3|1|Qty 10-19pcs|Y
01|83245|5|1|Qty 20-29pcs|Y
01|83247|1|1|NMTB50 2.500 arbor diameter L1= 1.3 L= close to 4.1|Y
01|83247|1|2|Flange Dia.= 5.0 Key= 1.0 4 bolts mounting|Y
01|83256|2|1|CAT40U-SKO10-145  Nikken SK10 Coolant Inducer|Y
01|83256|4|1|CAT40U-SKO16-150 Nikken SK Coolant Inducer.|Y
01|83265|1|1|VMK12-.308 Collet|Y
01|83266|1|1|ref. 124875|Y
01|83272|5|1|Customer request 0.9836|Y
01|83282|1|1|Convert 5AX-130FA-M to 5AX-130YA-M|Y
01|83282|1|2|Includes Haas cables for VF3 SN:1071103 (mfd 09/08)|Y
01|83282|1|3|& option to have service tech on-site to help with|Y
01|83282|1|4|installation and parameter changes.|Y
01|83283|1|1|Quick Change Right Angle Head|Y
01|83283|4|1|Collet Nut Wrench|Y
01|83283|5|1|Spindle Wrench|Y
01|83283|7|1|3/4 Tap Collet|Y
01|83283|10|1|Direct Coolant Plug for 1 Milling Chuck|Y
01|83283|12|1|Spanner Wrench for 1-1/4 Milling Chuck|Y
01|83283|13|1|Direct Coolant Plug for 1-1/4 Milling Chuck|Y
01|83283|18|1|1 Milling Chuck Collet for 3/4 Dia.|Y
01|83283|20|1|4 Gauge Length|Y
01|83283|21|1|6 Gauge Length|Y
01|83283|25|1|1/2 Tap Collet with Coolant Slots|Y
01|83283|27|1|1 Tap Collet with Coolant Slots|Y
01|83283|29|1|1.75 Gauge Length with 3/4 Pilot Dia.|Y
01|83283|30|1|4 Gauge Length with 3/4 Pilot Dia.|Y
01|83283|31|1|6 Gauge Length with 3/4 Pilot Dia.|Y
01|83283|32|1|8 Gauge Length with 3/4 Pilot Dia.|Y
01|83283|37|1|Face Mill Holder 2.95 Length 2 Pilot Dia.|Y
01|83283|38|1|Face Mill Holder 2.95 Length 2-1/2 Pilot Dia.|Y
01|83284|2|1|Pneumatic actuated (MT#3 sockets)|Y
01|83284|4|1|Installation includes: drive unit short bar fiber|Y
01|83284|4|2|optic cables communication cables bulk head cable|Y
01|83284|4|3|set external cable set parameter changes service|Y
01|83284|4|4|time and travel|Y
01|83284|5|1|Issued to Bob McCool; $1k tooling certificate|Y
01|83303|19|1|1|N
01|83307|19|1|1|N
01|83308|25|1|1|N
01|83312|1|1|Item is a special order item and is not cancellable or|Y
01|83312|1|2|returnable once the order is placed|Y
01|83318|21|1|(4) Wrenches above|Y
01|83318|22|1|(4) Wrenches above|Y
01|83323|21|1|(4) Wrenches above|Y
01|83323|22|1|(4) Wrenches above|Y
01|83335|1|1|Custom Positioning Block for Toyota Stealth 1365|Y
01|83335|2|1|Custom Positioning Block for Johnford SV-48H|Y
01|83335|2|2|`|N
01|83335|3|1|Custom Positioning Block for Johnford VMC-1600HD|Y
01|83335|4|1|Custom Positioning Block for Johnford VMC-2000HD|Y
01|83337|30|1|Need confirm with drawing|Y
01|83341|30|1|Need confirm with drawing|Y
01|83342|1|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|83342|1|2|External Cables Service Time & Travel.|Y
01|83342|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|83342|3|2|External Cables Service Time & Travel.|Y
01|83342|5|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|83342|5|2|External Cables Service Time & Travel.|Y
01|83342|7|1|Includes Cooling Unit Induction Rings Cooling|Y
01|83342|7|2|Brackets Storage Rack & Set of Chuck Holders|Y
01|83342|8|1|Includes Dual Cooling Stations Induction Rings|Y
01|83342|8|2|Cooling Brackets Storage Rack & Set of Chuck Holders|Y
01|83343|1|1|Aproaching obsolete status|Y
01|83343|2|1|Aproaching obsolete status|Y
01|83351|1|1|6ea are currently available|Y
01|83351|2|1|2ea are currently available|Y
01|83351|3|1|5ea currently available|Y
01|83351|4|1|Stock due 11/29/2017|Y
01|83351|5|1|3ea are currently available|Y
01|83351|6|1|3ea are currently available|Y
01|83351|7|1|4ea are currently available|Y
01|83351|8|1|12ea are currently available|Y
01|83351|9|1|Stock due 11/29/2017|Y
01|83371|1|1|Factory Stock ETA TBD|Y
01|83385|31|1|Please Note: Net price reflects purchase of knob with|Y
01|83385|31|2|matching taper holder.|Y
01|83387|1|1|CAT50-SF0312-3.15|Y
01|83387|1|2|CAT50 5/16 Shrink Fit Holder w 3.15 gage length|Y
01|83387|2|1|CAT50-SF0312-3.15|Y
01|83387|2|2|CAT50 5/16 Shrink Fit Holder w 3.15 gage length|Y
01|83387|3|1|CAT50-SF0312-3.15|Y
01|83387|3|2|CAT50 5/16 Shrink Fit Holder w 3.15 gage length|Y
01|83402|1|1|Quoted at Net price.|Y
01|83402|2|1|Quoted at Net price.|Y
01|83405|11|1|Take advantage of the Core Trade In Promo discount!|Y
01|83405|11|2|We give you a 45% discount so you can pass 25% on to|Y
01|83405|11|3|your end user and seal the deal!|Y
01|83408|7|1|MACHINE DATA SHEETS REQUIRED TO DETERMING AXIS|Y
01|83408|7|2|PARAMETERS ARE AVAILABLE. INSTALLATION OF 4TH AXIS|Y
01|83408|7|3|INCLUDES DRIVE FIBRE OPTICS CONNECTORS TRAVEL|Y
01|83408|7|4|LABOR TRAINING|Y
01|83408|9|1|INCLUDES INDEPENDENT CONTROLLER. USES M SIGNAL|Y
01|83408|9|2|OR RS-232 INTERFACE AS INDEXER ONLY|Y
01|83408|9|3|INSTALLATION MINIMAL COST ESTIMATED $ 3500.00|Y
01|83409|7|1|Please check with customer to see if wrenches are reqd|Y
01|83420|4|1|Incluye Amplificador Cables y visita de Especialista|Y
01|83420|4|2|a sus instalaciones para la instalacion.|Y
01|83423|1|1|Putting line commment on CAT40-SK10|N
01|83423|1|2|2nd line on line comment here.  Hiro|N
01|83423|1|3|3rd line on line comment.  HiroK|N
01|83423|2|1|line comment on SK10-1/4A.  Hiro|N
01|83423|2|2|line comment#2.  this comment to show up to JimG|Y
01|83425|3|1|High Speed 33 RPM Version.|Y
01|83431|1|1|Face Value of $7500.00|Y
01|83447|1|1|Lead 4-5 weeks|Y
01|83462|15|1|optional part closest to 160mm|Y
01|83465|1|1|Reference RGA# TAR-50850|Y
01|83465|1|2|5AX-2002FA s/n: 2106 (Cannot verify s/n as there is no|Y
01|83465|1|3|name plate on the table.)|Y
01|83465|1|4|Table sent in for full evaluation.|Y
01|83468|2|1|2 different options presented.The first line is the|Y
01|83468|2|2|special closeout and the 2nd is the standard option|Y
01|83468|4|1|2 different options of the same holder.1st option is a|Y
01|83468|4|2|closeout special.2nd item is our standard|Y
01|83468|6|1|2 different options of the same holder.1st option is a|Y
01|83468|6|2|a special closeout item.The second is our standard|Y
01|83468|8|1|2 different options of the same holder.1st option is a|Y
01|83468|8|2|closeout special.2nd item is a standard|Y
01|83473|1|1|Custom Positioning Block for Southwestern Industries|Y
01|83473|1|2|FHM7 machine. Specs to be provided to Tim Reeves to|Y
01|83473|1|3|design and produce.|Y
01|83477|1|1|**Please verify drive information with Engineering|Y
01|83477|1|2|before placing order.|Y
01|83494|3|1|BT30-SKO25-145 Coolant Inducer SK25 collet output|Y
01|83494|3|2|capable of 25mm maximum shank capacity.|Y
01|83501|2|1|*5pc min|Y
01|83501|3|1|*5pc min|Y
01|83501|6|1|*5pc min|Y
01|83501|9|1|*10pc set|Y
01|83501|10|1|*5pc min|Y
01|83501|11|1|*5pc min|Y
01|83501|15|1|*5pc min|Y
01|83501|16|1|*5pc min|Y
01|83501|17|1|*5pc min|Y
01|83501|18|1|*5pc min'|Y
01|83504|1|1|We currently have 19 in stock|Y
01|83504|1|2|More due in at the end of Dec. may be able to expedite|Y
01|83504|2|1|We currently have 19 in stock|Y
01|83504|2|2|More due in at the end of Nov. may be able to expedite|Y
01|83514|1|1|Repair of customer's CAT50U-NX5-151 s/n: Ib-033|Y
01|83514|1|2|Reference RGA# 50734|Y
01|83518|8|1|Pricing reflects modification to high speed tool.|Y
01|83518|8|2|High speed nut added to holder.|Y
01|83518|9|1|Pricing reflects modification to high speed tool.|Y
01|83518|9|2|High speed nut added to holder.|Y
01|83520|1|1|Non-returnable Noncancelabl|Y
01|83526|6|1|close to 2.76 GL|N
01|83526|7|1|closet to 4 GL|N
01|83526|15|1|closet to 3.75 GL|N
01|83526|19|1|need 1/8-1 x 1/32|N
01|83526|20|1|closet to 1.75 Gl|N
01|83532|3|1|Installation includes: Drive unit short bar fiber|Y
01|83532|3|2|optic cables bulkhead cables external cables|Y
01|83532|3|3|parameter changes  service time and travel.|Y
01|83537|1|1|Repair of 5AX-130SA-BR-QT s/n: 4929 Rotary Axis|Y
01|83537|13|1|Item was used as a substitute for SC30458 Oil Seal that|Y
01|83537|13|2|was not in stock.|Y
01|83539|11|1|Customer can recieve 1 $5 pull stud for every 1 tool|Y
01|83539|11|2|holder purchased!!|Y
01|83539|11|3|]|N
01|83539|13|1|Metric Set|Y
01|83539|14|1|Imperial Set|Y
01|83539|15|1|Imperial Set|Y
01|83539|16|1|Metric Set|Y
01|83544|8|1|NCAT40-SK6C-60UP WOULD BE A SPECIAL IN 60mm GL -NOT|Y
01|83544|8|2|ELIGIBLE FOR PURCHASE ON TOOLING CERTIFICATE.|Y
01|83545|1|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|83545|1|2|External Cables Service Time & Travel.|Y
01|83545|2|1|Includes Manual Tailstock 8 Scroll Chuck and CAT40|Y
01|83545|2|2|ER High Torque Starter Package - 12 Holders|Y
01|83545|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|83545|3|2|External Cables Service Time & Travel.|Y
01|83545|4|1|Includes Manual Tailstock 10 Scroll Chuck and CAT40|Y
01|83545|4|2|ER High Torque Starter Package - 12 Holders|Y
01|83545|5|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|83545|5|2|External Cables Service Time & Travel.|Y
01|83545|6|1|Includes Manual Tailstock 12 Scroll Chuck and CAT40|Y
01|83545|6|2|ER High Torque Starter Package - 12 Holders|Y
01|83545|8|1|Includes Cooling Unit Induction Rings Cooling|Y
01|83545|8|2|Brackets Storage Rack & Set of Chuck Holders.|Y
01|83545|9|1|Includes Dual Cooling Stations Induction Rings|Y
01|83545|9|2|Cooling Brackets Storage Rack & Set of Chuck Holders.|Y
01|83552|3|1|*for Haas VF-2|Y
01|83552|4|1|for Mori Seiki NV4000 (CAT40 - Vertical Mill)|Y
01|83552|5|1|for YCM NMV 106A (CAT40 - Vertical Mill)|Y
01|83555|2|1|Kit includes: Drive external cables internal cables|Y
01|83555|2|2|fiber optic cables short bar and Fanuc|Y
01|83555|2|3|battery.|Y
01|83555|2|4|*** Equipment data sheets must be submitted to L-N|Y
01|83555|2|5|before the release of product.|Y
01|83556|2|1|Kit includes: Drive external cables internal cables|Y
01|83556|2|2|fiber optic cables short bar and Fanuc|Y
01|83556|2|3|battery.|Y
01|83556|2|4|*** Equipment data sheets must be submitted to L-N|Y
01|83556|2|5|before the release of product.|Y
01|83557|1|2|RIGHT HAND VERSION NEEDED|Y
01|83557|1|3|PART NUMBER CNCZ202LSA-BR2/S1000X1|Y
01|83557|1|4|PRIICING IS THE SAME|Y
01|83560|5|1|BT40 1/4 End Mill Holder 6 GL|Y
01|83560|7|1|BT40 3/16 End Mill Holder 6 GL|Y
01|83560|10|1|BT40 1/8 End Mill Holder 6 GL|Y
01|83562|1|1|For Hurco Machining Center|Y
01|83563|17|1|NCAT50-SF1000-6.30CP IN STOCK $567.00|Y
01|83592|1|1|Non-returnable Non-cancelable|Y
01|83604|1|1|Swap but for external coolant nut|Y
01|83604|2|1|No charge|Y
01|83604|3|1|no-charge|Y
01|83608|14|1|** Chance of COST increase. Reconfirm P&D **|Y
01|83608|15|1|** Chance of COST increase. Reconfirm P&D **|Y
01|83619|14|1|H100A-SF0375-6.30 11pcs in stock|Y
01|83620|14|1|H100A-SF0375-6.30 11pcs in stock|Y
01|83621|5|1|INCLUDES DRIVE OPTIC CABLE CONNECTORS SERVO MOTOR|Y
01|83621|5|2|WIRE HARNESS LABOR TRAVEL TRAINING|Y
01|83621|5|3|MACHINE DATA SHEETS MAY BE NEEDED|Y
01|83653|3|2|Incluye el amplificador para cada eje (4to y 5to)|Y
01|83653|3|3|Incluye todos los cables y conexiones  mesa-maquina|Y
01|83653|3|4|Incluye mano de obre de nuestro especialista en Gdl.|Y
01|83657|2|1|CAT40-SK25-90U-IDU-J Coolant Nut must be installed|Y
01|83657|2|2|prior to shipping. Price includes coolant nut.|Y
01|83671|33|1|Please note: $5.00 net price offered with the purchase|Y
01|83671|33|2|of a matching taper holder. If your customer should|Y
01|83671|33|3|change quantities please contact me for re-quote.|Y
01|83677|1|1|IT50-C42-105|Y
01|83677|1|2|IT Multi Lock Milling Chuck|Y
01|83677|3|1|All of the above items are considered special order and|Y
01|83677|3|2|cannot be cancelled or returned once order is placed|Y
01|83681|1|1|QUOTED AT NET PRICE. ITEM IS USED|Y
01|83688|1|1|Installed with 3416.00000 collet nut|Y
01|83688|2|1|Installed with 3420.00000 collet nut|Y
01|83688|21|1|Installed on H63A(80) holders at factory|Y
01|83688|22|1|Installed on H63A(80) holders at factory|Y
01|83706|2|1|1-2 week lead time|Y
01|83710|7|1|*Lyndex-Nikken to make position block based on receipt|Y
01|83710|7|2|of machine spindle drawing|Y
01|83711|24|1|Please Note: $5.00 net knob reflects the purchase of|Y
01|83711|24|2|of a matching taper holder.|Y
01|83716|1|1|Quoted at NET price.|Y
01|83721|1|1|Prepared with A06B-2223-B000 Alpha 4/5000 Motor|Y
01|83721|3|1|***Assuming control is the same as the machine provided|Y
01|83721|3|2|otherwise A06B-6240-H104 below line item is needed.|Y
01|83721|4|1|***Assuming Samsung is using an Alpha amplifier. If|Y
01|83721|4|2|using Beta A06B-6160-H003 - $2450 List Price|Y
01|83722|1|1|MUST CONFIRM PROPER FIT ON MACHINE|Y
01|83722|1|2|CONFIRMATION OF OSP CONTROL|Y
01|83722|1|3|IF MA CONTROL OSP4 MOTORS NEEDED|Y
01|83722|3|1|POWER AND FEEDBACK CABLES INCLUDED|Y
01|83723|3|1|Includes Installation Drive Units Bulkhead Cables|Y
01|83723|3|2|External Cables Service Time & Travel|Y
01|83725|3|1|This item is given in terms of NET price. Not further|Y
01|83725|3|2|discount is to be taken from this price.|Y
01|83728|1|1|-|Y
01|83728|1|2|Lyndex Nikken will provide a rebuilt loaner at no|Y
01|83728|1|3|cost until back ordered lot arrives end of Dec 2017|Y
01|83728|1|4|-|Y
01|83728|1|5|-|Y
01|83728|1|6|***ISS: Please contact JB for instructions***|Y
01|83732|1|1|HOWA# HH960C115 Z-82 Rotary Cyl|Y
01|83732|1|2|Special order item cannot be returned or cancelled once|Y
01|83732|1|3|the order is placed|Y
01|83748|1|1|Please confirm delivery at time of inquiry/or purchase|Y
01|83755|3|1|Installation Includes: Drive amps bulkhead cable sets|Y
01|83755|3|2|external cable sets communication cablestravel and|Y
01|83755|3|3|labor for installation.|Y
01|83755|3|4|Please note: THIS COST DOES NOT INCLUDE ANY PARAMETERS|Y
01|83755|3|5|THAT FANUC|Y
01|83755|3|6|Make: Enshu USA Corporation  Model#: EV530|Y
01|83765|3|1|Unit used to convert air to more robust hydraulic brake|Y
01|83765|4|1|Installation includes: drive unit short bar fiber|Y
01|83765|4|2|optic cables communication cables bulk head cable|Y
01|83765|4|3|set external cable set parameter changes service|Y
01|83765|4|4|time and travel.|Y
01|83798|2|1|Unit used to convert air to more robust hydraulic brake|Y
01|83798|3|1|Installation includes: drive unit short bar fiber|Y
01|83798|3|2|optic cables communication cables bulk head cable|Y
01|83798|3|3|set external cable set parameter changes service|Y
01|83798|3|4|time and travel|Y
01|83798|4|1|Tooling certificate good for $1000 of Lyndex Nikken|Y
01|83798|4|2|tool holders.|Y
01|83802|1|1|CAT40-DJ3-90A|Y
01|83818|7|1|H63A-SF0250-3.15CP 7PCS IN STOCK|N
01|83818|8|1|CUSTOMER REQUEST 5 GL|N
01|83818|9|1|H63A-SF0312-3.15CP 6pcs in stock|N
01|83818|11|1|customer request 5 GL|N
01|83818|14|1|H63A-SF0500-6.30CP 9pcs in stock|N
01|83818|15|1|H63A-SF0750-3.94CP 13 PCS IN STOCK|N
01|83841|20|1|COLLET PROMO HAS BEEN APPLIED TO ALL COLLETS! 35% disc|Y
01|83841|20|2|MAY BE TAKEN ON ALL COLLETS PURCHASED AT THE SAME TIME|Y
01|83841|20|3|AS THEIR MATCHING TOOLHOLDERS! Standard Collet discount|Y
01|83841|20|4|is 20%.|Y
01|83843|3|1|EXTERNAL CABLE SET|Y
01|83843|5|1|Includes cables drive fiber optic cable interface|Y
01|83843|5|2|cable|Y
01|83850|1|1|Tooling Certificate Number: 6475-1069-111017|Y
01|83872|6|1|MZQT47-CAPTO4Z-ICE-130|Y
01|83872|7|1|MZQT47-CAPTO4Z-ICE-95|Y
01|83872|8|1|E/U requested 2 pieces.  ETA on balance is End-3/18|Y
01|83879|1|1|HSK63F-FM1000-4.00|Y
01|83879|1|2|HSK63 F style taper Face Mill (bolt pattern) w 4.00gl|Y
01|83880|1|1|***Standard Z-Axis***|Y
01|83880|2|1|***Dry/Internal/External coolant Z-Axis***|Y
01|83880|3|1|***Main & Sub Z-Axis***|Y
01|83891|1|1|Complete with Fanuc Motor - Back Mounted|Y
01|83917|3|1|External cable set|Y
01|83922|3|1|Installation of table hydraulic unit and RS232 to the|Y
01|83922|3|2|machine|Y
01|83924|1|1|Ref: RGA#LVR-50902|Y
01|83924|1|2|Repair of OKL3-ER32Z SN#AL0028|Y
01|83924|1|3|Send in for evaluation.|Y
01|83924|2|1|Bearings seals O-rings spindle collet nut|Y
01|83924|2|2|lock washer must be replaced.|Y
01|83924|2|3|Labor is included.|Y
01|83924|4|1|Core Trade In. List less 45%.|Y
01|83937|1|1|Ref:RGA#CUR-50867|Y
01|83937|1|2|Repair of C50-MRAMHC SN#64878 03|Y
01|83937|1|3|Tool is crashed.|Y
01|83937|2|1|No quote - Tool is badly damaged and cannot repair.|Y
01|83937|4|1|Ref:RGA#CUR-50867|Y
01|83937|4|2|Repair of MRAM-ER25-IC SN#65562 01|Y
01|83937|4|3|Tool is crashed.|Y
01|83937|5|1|All bearings seals and o-ring must be replaced.|Y
01|83937|5|2|Replace damaged spindle along with threadrings.|Y
01|83982|1|1|Tooling Certificate Number: 13170-919-020217 ($2598.50)|Y
01|83982|1|2|Tooling Certificate Number:13170-1054-102417($15000.00)|Y
01|83991|5|1|** Internal Coolant - But can run DRY 24/7 **|Y
01|84009|18|1|**AWAITING PRICE & DELIVERY INFO FROM FACTORY**|Y
01|84009|19|1|**AWAITING PRICE & DELIVERY INFO FROM FACTORY**|Y
01|84026|43|1|$5.00 RETENTION KNOB PROMO HAS BEEN APPLIED IN QUANTITY|Y
01|84026|43|2|EQUAL TO NUMBER OF TOOLHOLDERS ON PO.|Y
01|84046|1|1|Nikken 5 Scroll Chuck R-5|Y
01|84046|2|1|Special Adapter Plate for 5AX-130 Rotary Table|Y
01|84046|2|2|Signed Approval Drawing Required|Y
01|84072|1|1|KM3/4-6.9|Y
01|84072|1|2|KM3/4 Straight Collet/Sleeve 6.5mm|Y
01|84072|2|1|KM3/4-8.5|Y
01|84072|2|2|KM3/4 Straight Collet/Sleeve 8.5mm|Y
01|84072|3|1|KM3/4-11/32|Y
01|84072|3|2|KM3/4 Straight Collet/Sleeve 11/32in|Y
01|84072|5|1|KM1.1/4-6.9|Y
01|84072|5|2|KM1.1/4 Straight Collet/Sleeve 6.9mm|Y
01|84072|6|1|KM1.1/4-8.5|Y
01|84072|6|2|KM1.1/4 Straight Collet/Sleeve 8.5mm|Y
01|84072|7|1|KM1.1/4-11/32|Y
01|84072|7|2|KM1.1/4 Straight Collet/Sleeve 11/32in|Y
01|84075|6|1|LYNDEX NIKKEN TOOL CERTIFICATE|Y
01|84078|14|1|customer want 13 pcs set|N
01|84080|1|1|Includes labor fiber optic cable Fanuc battery|Y
01|84080|1|2|short bar communications cable|Y
01|84080|1|3|Drive unit and cables provided by Toyoda|Y
01|84091|1|1|Ref:RGA#TAR-50859|Y
01|84091|1|2|Repair of NSVZ300FA-M SN#NA|Y
01|84091|1|3|Send in for evaluation.|Y
01|84091|40|1|NV301R050|Y
01|84091|41|1|NV301R009|Y
01|84097|3|2|Must be Coolant Port modified prior to shipping.|Y
01|84097|4|1|Modification to NC4016-0500-4.00CP Coolant Ports|Y
01|84107|2|1|3-Jaw chuck includes: soft jaws bolts eye bolt and|Y
01|84107|2|2|hex wrench.|Y
01|84107|3|1|Adapter plate (Chuck to Table)|Y
01|84107|4|1|Chuck actuating cylinder|Y
01|84107|5|1|Draw bar (connecting rod to actuate chuck)|Y
01|84107|6|1|Adapter plate (Actuator to Table)|Y
01|84107|7|1|Hydraulic unit to power: Table brake support spindle|Y
01|84107|7|2|brake and chuck actuator.|Y
01|84107|8|1|Support with hydraulic brake|Y
01|84107|9|1|Additional solenoid reducer and pressure switch for|Y
01|84107|9|2|chucking.|Y
01|84107|10|1|Heavy duty foot pedal kit with safety shroud (complete)|Y
01|84107|11|1|Installation includes: drive unit short bar fiber|Y
01|84107|11|2|optic cables communication cables bulk head cable|Y
01|84107|11|3|set external cable set parameter changes service|Y
01|84107|11|4|time/travel and training.|Y
01|84111|1|1|Includes Haas Motors|Y
01|84111|2|1|4 port Rotary Union for 5AX-130|Y
01|84111|3|1|Includes Haas Motors|Y
01|84111|4|1|Built-in Type 4 port Rotary Joint for 5AX-201|Y
01|84111|5|1|Includes Haas Motors|Y
01|84111|6|1|Special Rotary Union for 5AX-2MT-170-200|Y
01|84126|1|1|Ref:RGA#TAR-50899|Y
01|84126|1|2|5AX-350FA-R36 SN#3522|Y
01|84126|1|3|Hydraulic leak through air ports.|Y
01|84126|3|1|9.040mm|Y
01|84126|4|1|18.927mm|Y
01|84127|1|1|Installation includes: drive unit short bar fiber|Y
01|84127|1|2|optic cables communication cables bulk head cable|Y
01|84127|1|3|set external cable set parameter changes service|Y
01|84127|1|4|time and travel|Y
01|84131|3|1|Table requires 500psi for the brake system.|Y
01|84131|5|1|50 Taper center socket with draw bar and cylinder|Y
01|84132|3|1|50 Taper center socket with draw bar and cylinder|Y
01|84136|1|1|ref. Mimatic part# 174697|Y
01|84142|3|2|Must be Coolant Port modified prior to shipping.|Y
01|84142|4|1|Modification to NC4016-0500-4.00CP Coolant Ports|Y
01|84151|11|1|Part#C50FHM-ER32-215-80FP|Y
01|84151|33|1|Special Position Block made by Lyndex-Nikken|Y
01|84151|33|2|Spindle drawing is required.|Y
01|84152|2|1|Installation includes: drive unit short bar fiber|Y
01|84152|2|2|optic cables communication cables bulk head cable|Y
01|84152|2|3|set external cable set parameter changes service|Y
01|84152|2|4|time and travel|Y
01|84153|1|1|Special order item quoted at Net pricing|Y
01|84153|1|2|Lead time 2-3 weeks|Y
01|84155|2|1|Installation includes: drive unit short bar fiber|Y
01|84155|2|2|optic cables communication cables bulk head cable|Y
01|84155|2|3|set external cable set parameter changes service|Y
01|84155|2|4|time and travel|Y
01|84155|5|1|***Optional*** Convert table to use hydraulic braking|Y
01|84164|3|1|Set of 5 pcs = $47.25 each pc|Y
01|84164|3|2|Metric Sizing also available|Y
01|84164|6|1|Set of 19pcs = $55.30 each pc|Y
01|84164|6|2|Metric sizing also available|Y
01|84164|9|1|Set of 8pc at avg list of  $70.00|Y
01|84164|9|2|Metric Sizes are available|Y
01|84166|1|1|Ref: RGA#TOR-50950|Y
01|84166|1|2|Repair of CAT40U-UMT200U|Y
01|84166|1|3|Send in for evaluation.|Y
01|84166|2|1|Tool need to calibrate. No replacement parts needs.|Y
01|84166|4|1|Repair of CAT40U-UMT200U|Y
01|84166|4|2|Send in for evaluation.|Y
01|84179|2|1|Coolant Port for External Coolant|Y
01|84179|6|1|Wrenches Included|Y
01|84179|10|1|Wrenches Included|Y
01|84179|17|1|Coolant Ports|Y
01|84179|21|1|Requires spindle drawing of machine.|Y
01|84183|1|1|135615 Angle Head ER25 Offset Slim Type|Y
01|84207|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|84207|2|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|84211|1|1|(CablesHYD Unit Accessary Instaltionnot included)|Y
01|84221|2|1|Special Order item 3e currently in stock.If need to|Y
01|84221|2|2|reorder the lead will increase to 12-14 weeks|Y
01|84221|10|1|2017 Promo Price is ordered at same time as holders|Y
01|84222|17|1|NCAT50-SF1000-6.30CP IN STOCK $567.00|Y
01|84222|41|1|CAT50-SF1000-6.30CP IN STOCK $517.00|Y
01|84243|7|1|CNC 86-13CS .750 CS Style Bushing 1.1/2OD x 1ID|Y
01|84243|8|2|CNC 86-13CS .750 CS Style Bushing 1.1/2OD x 3/4ID|Y
01|84262|21|1|*** Balance from prior tool cert = $2869 ***|Y
01|84262|21|2|*** New balance after order = $113.20 ***|Y
01|84267|3|1|Includes drive unit fiber optic cable interface|Y
01|84267|3|2|cable external cable short bar communications cable|Y
01|84267|3|3|labor and travel|Y
01|84289|2|1|3-Jaw chuck includes: soft jaws bolts eye bolt and|Y
01|84289|2|2|hex wrench.|Y
01|84289|3|1|Adapter plate (Chuck to Table)|Y
01|84289|4|1|Chuck actuating cylinder|Y
01|84289|5|1|Draw bar (connecting rod to actuate chuck)|Y
01|84289|6|1|Adapter plate (Actuator to Table)|Y
01|84289|7|1|Hydraulic unit to power: Table brake support spindle|Y
01|84289|7|2|brake and chuck actuator.|Y
01|84289|9|1|Additional solenoid reducer and pressure switch for|Y
01|84289|9|2|chucking.|Y
01|84289|10|1|Heavy duty foot pedal kit with safety shroud (complete)|Y
01|84289|11|1|Installation includes: drive unit short bar fiber|Y
01|84289|11|2|optic cables communication cables bulk head cable|Y
01|84289|11|3|set external cable set parameter changes service|Y
01|84289|11|4|time/travel and training.|Y
01|84289|12|1|** $1k tooling certificate issued to Foster for|Y
01|84289|12|2|considering Lyndex Nikken complete solution|Y
01|84300|2|1|Customer will need to mill the coolant hole|Y
01|84310|2|1|Installation Includes: Drive amps bulkhead cable sets|Y
01|84310|2|2|external cable sets communication cablestravel and|Y
01|84310|2|3|labor for installation.|Y
01|84310|2|4|Please note: THIS COST DOES NOT INCLD PARAMETER OPTION|Y
01|84318|73|1|*use with SK25-24 collet|Y
01|84318|73|2|**Woodward must machine to desired size|Y
01|84318|83|1|*coolant cap for SK6-4|Y
01|84318|89|1|part# C6-MDSK10-90-J|Y
01|84318|90|1|part# C6-SK10-120U-J|Y
01|84318|107|1|for SK6  collet chucks|Y
01|84318|108|1|for SK10 collet chucks|Y
01|84318|110|1|for SK25 collet chucks|Y
01|84318|111|1|for 1.1/4 Milling Chuck|Y
01|84322|1|1|Tooling Certificate Number:|Y
01|84322|1|2|13435-707-120215RT|Y
01|84322|1|3|13435-708-120215RT|Y
01|84322|1|4|13435-735-020316RT|Y
01|84322|1|5|13435-736-020316RT|Y
01|84328|1|1|Special order item non cancelable or returnable|Y
01|84328|1|2|once an order is placed|Y
01|84331|1|1|PACKAGE PRICE INCLUDING BELOW 4TH AND 5TH AXIS|Y
01|84331|1|2|INSTALLATION|Y
01|84331|3|1|includes complete 4 + 1 installation|Y
01|84331|3|2|additional drives external internal cable included|Y
01|84331|3|3|all connectors and harware included. labor and travel|Y
01|84332|1|1|PACKAGE PRICE INCLUDING BELOW 4TH AND 5TH AXIS|Y
01|84332|1|2|INSTALLATION|Y
01|84332|3|1|includes complete 4 + 1 installation|Y
01|84332|3|2|additional drives external internal cable included|Y
01|84332|3|3|all connectors and harware included. labor and travel|Y
01|84349|1|1|Ref:TAR-50992|Y
01|84349|1|2|Repair of CNC200BFA SN#3018|Y
01|84349|1|3|It might be backlash in the table.|Y
01|84357|1|1|ref. Okuma A555-2540|Y
01|84359|2|1|Includes all electronic and labor @ Celaya.|Y
01|84364|1|1|Ref:RGA#TAR-50901|Y
01|84364|1|2|Repair of 5AX-350FA-R36  SN#3514|Y
01|84364|1|3|Leaking oil out air seat ports.|Y
01|84376|1|1|105mm Rot. Table Right-Hand Sanyo Motor for|Y
01|84376|1|2|Brother R650|Y
01|84398|1|1|Ref:RGA#TAR-50892|Y
01|84398|1|2|Repair of 5AX-2MT-105-120 SN#8206|Y
01|84398|1|3|Might be oil leaking.|Y
01|84404|4|1|HSK63A-SK20-105P|Y
01|84404|4|2|HSK63A SK20 Slim Chuck High Speed 105 GL|Y
01|84404|4|3|Quoted as NET PricingNon-returnableNon-cancelable|Y
01|84404|5|1|HSK63A-SK20C-120P|Y
01|84404|5|2|HSK63A SK20 Slim Chuck High Speed 120 GL|Y
01|84404|5|3|Quoted as NET PricingNon-returnableNon-cancelable|Y
01|84409|1|1|Tooling Certificate Number: 13170-1054-102417|Y
01|84411|2|1|*** Answers line item #1 ***|Y
01|84411|7|1|*** Answers line item #2 & 3 ***|Y
01|84411|11|1|*** Answers line item #4 ***|Y
01|84411|19|1|*** Answers line item #5 ***|Y
01|84411|23|1|*** Answers line item #6 ***|Y
01|84451|2|1|Special order item non cancelable or returnable|Y
01|84459|2|1|ETA 1 WK after design is completed|Y
01|84459|2|2|NET Pricing|Y
01|84492|2|1|139290|Y
01|84492|2|2|Guiding Pin|Y
01|84492|3|1|138870|Y
01|84492|3|2|Excentric bolt 12|Y
01|84492|4|1|138844|Y
01|84492|4|2|Excentric bolt 16 with arrester/stop bar|Y
01|84492|5|1|111874|Y
01|84492|5|2|Screwed  pressure spring D206A|Y
01|84492|6|1|114731|Y
01|84492|6|2|Cheese head acrew M4x16 12.9|Y
01|84508|2|1|CABLES WILL BE INCLUDED|Y
01|84508|8|1|$ 1000 tool LYNDEX NIKKEN TOOL CERTIFICATE (LIST PRICE|Y
01|84511|4|1|Adapter Plate to allow 5C accessory to fit RT|Y
01|84524|1|1|5C Hex Collet .432 ID|Y
01|84524|1|2|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|84531|1|1|Ref:TAR-50948|Y
01|84531|1|2|CNC300 SN#1197E|Y
01|84531|1|3|Too much  plax in the gearing/slop.|Y
01|84531|31|1|Wire harness|Y
01|84531|31|2|Per Walden they can make this at our WH|N
01|84537|1|1|H012M25 R-217 Master Jaws 1 set(=3pcs)|Y
01|84537|1|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|84537|2|1|H012M25 R-217 Seal Kit|Y
01|84537|2|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|84548|3|1|** Closeout Promotion! All sales are FINAL!**|N
01|84548|3|2|**HOT DEALS** DIST Net $90 EU Net $113 While Qtys Last|N
01|84552|1|1|Tooling Certificate Number: 6475-1069-111017|Y
01|84554|1|1|4TH AND 5TH AXIS INSTALLATION NEEDED|Y
01|84565|1|1|180706|Y
01|84565|1|2|Verriegelungslasche A110|Y
01|84565|2|1|111960|Y
01|84565|2|2|Schraubendruckfeder D 234G|Y
01|84571|1|1|Ref:LVR-50970|Y
01|84571|1|2|Mazak (03251) SN#NA|Y
01|84571|1|3|Send in for evaluation.|Y
01|84571|2|1|Replace all bearings seals & o-rings.|Y
01|84571|2|2|Labor is included.|Y
01|84584|1|1|With special faceplate(REF S/N 4576)|Y
01|84584|2|1|With special faceplate and A06B-2227-B000 motor|Y
01|84584|3|1|with special faceplate|Y
01|84592|1|1|Nikken SRS-0.1875 Straight Shank Tough Cut Skill Rmr.|Y
01|84592|1|2|3/16|Y
01|84592|2|1|Nikken SRS-0.2500 Straight Shank Tough Cut Skill Rmr.|Y
01|84592|2|2|1/4|Y
01|84592|3|1|Nikken SRS-0.3125 Straight Shank Tough Cut Skill Rmr.|Y
01|84592|3|2|5/16|Y
01|84592|4|1|Nikken SRS-0.3750 Straight Shank Tough Cut Skill Rmr.|Y
01|84592|4|2|3/8|Y
01|84592|5|1|Nikken SRS-0.4375 Straight Shank Tough Cut Skill Rmr.|Y
01|84592|5|2|7/16|Y
01|84592|6|1|Nikken SRS-0.0500 Straight Shank Tough Cut Skill Rmr.|Y
01|84592|6|2|1/2|Y
01|84611|19|1|Will update delivery with the factory|Y
01|84625|1|1|Quoted with PS-N100VE Pull Stud|Y
01|84635|2|1|New Part Number# BT30-MMC8C-105-AA|Y
01|84641|2|1|This is a non standard stock item once a order is|Y
01|84641|2|2|placed it cannot be cancelled or returned.|Y
01|84655|1|1|Special faceplate and A06B-2227-B000 motor|Y
01|84655|1|2|(REF S/N 4576)|Y
01|84655|2|1|Installation includes: drive unit short bar fiber|Y
01|84655|2|2|optic cables communication cables bulk head cable|Y
01|84655|2|3|set external cable set parameter changes service|Y
01|84655|2|4|time and travel|Y
01|84655|2|5|*****This is a budgetary figure based on very limited|Y
01|84655|2|6|information about the machine or location of install|Y
01|84655|3|1|Special faceplate(REF S/N 4576)|Y
01|84666|1|1|55mm Centerline|Y
01|84666|2|1|70mm Centerline|Y
01|84680|1|1|CAT40 SHRINK FIT PACKAGE STD W/10 FREE APPLICABLE|Y
01|84680|1|2|HOLDERS|Y
01|84680|4|1|CAT40 SHRINK FIT PACKAGE EXTENDED W/10 FREE APPLICABLE|Y
01|84680|4|2|HOLDERS|Y
01|84680|7|1|CAT50 SHRINK FIT PACKAGE STD W/10 FREE APPLICABLE|Y
01|84680|7|2|HOLDERS|Y
01|84680|10|1|CAT50 SHRINK FIT PACKAGE EXTENDED W/10 FREE APPLICABLE|Y
01|84680|10|2|HOLDERS|Y
01|84694|5|1|Riser for above support|Y
01|84694|7|1|Installation includes: drive unit short bar fiber|Y
01|84694|7|2|optic cables communication cables bulk head cable|Y
01|84694|7|3|set external cable set parameter changes service|Y
01|84694|7|4|time and travel|Y
01|84700|1|1|Special faceplate and A06B-2227-B000 motor|Y
01|84700|1|2|(REF S/N 4576)|Y
01|84700|2|1|Installation includes: drive unit short bar fiber|Y
01|84700|2|2|optic cables communication cables bulk head cable|Y
01|84700|2|3|set external cable set parameter changes service|Y
01|84700|2|4|time and travel|Y
01|84700|2|5|*****This is a budgetary figure based on very limited|Y
01|84700|2|6|information about the machine or location of install|Y
01|84700|3|1|***Empty rotary table without an internal motor***|Y
01|84700|3|2|Special faceplate(REF S/N 4576)|Y
01|84700|4|1|With special faceplate|Y
01|84703|1|1|Please advise the taper of the holders so I can add|Y
01|84703|1|2|the pots to the quote.|Y
01|84704|1|1|Modification of Mori DV Machines to utilize Nikken|Y
01|84704|1|2|TAT Support Table Brake|Y
01|84704|1|3|Brake is Air Supplied|Y
01|84704|1|4|Includes:  Travel Time Service Time Solenoid|Y
01|84704|1|5|Manifold Block Mounting Bracket Wire Harness|Y
01|84704|1|6|Air Lines|Y
01|84705|1|1|Installation of CNC321LFA on Mori DV5100|Y
01|84705|1|2|Includes:  Travel Time Labor Amplifier Hardware|Y
01|84705|1|3|and Interface items|Y
01|84708|1|1|BT40-SK20-90|Y
01|84708|1|2|BT40 SK20 Slim Chuck|Y
01|84710|1|1|check delivery & drawing|N
01|84710|3|1|check delivery|N
01|84714|1|1|6475-1069-111017|Y
01|84718|1|1|Item 1: CAT 40 2.5dia face mill|Y
01|84718|2|1|item 2:CAT 40 1/2 power grip for milling|Y
01|84718|3|1|Item 2: CAT 40 1/2 power grip for milling|Y
01|84718|4|1|item 3:CAT 40 1/4 power grip for milling|Y
01|84718|6|1|item 4:CAT 40 5/8 power grip for milling|Y
01|84718|8|1|item 5:CAT 40 3/4 power grip for milling|Y
01|84718|9|1|item 6: CAT 40 3/4 end mill holder for drilling approx|Y
01|84718|10|1|item 7: CAT 40 3/4 end mill holder for drilling approx|Y
01|84718|11|1|item 8:CAT 40 ER32 collet holder (chamfer tool)|Y
01|84718|13|1|item 9:CAT 40 ER32 collet holder (dovetail cutter)|Y
01|84718|15|1|item 10:End mill holders for 3/4 shank|Y
01|84718|16|1|item 11:CAT 40 ER25 (small drills and en mills)|Y
01|84718|18|1|item 12:CAT 40 1 power grip for milling pocket|Y
01|84718|19|1|item 13:CAT 40 1/4 power grip for milling pocket|Y
01|84718|21|1|item 14:CAT 40 1/2 power grip for milling pocket|Y
01|84718|23|1|item 13:CAT 40 1/4 power grip for milling pocket|Y
01|84718|25|1|item 14:CAT 40 1/2 power grip for milling pocket|Y
01|84718|27|1|item 15:CAT 40 3/8 power grip for milling pocket|Y
01|84718|30|1|item 16:CAT 40 12mm power grip for milling pocket|Y
01|84726|1|1|Ref:TAR-50903|Y
01|84726|1|2|CNCZ180LYA-BR SN#10037|Y
01|84726|1|3|Having clamping issue.|Y
01|84727|2|1|Installation includes: drive unit short bar fiber|Y
01|84727|2|2|optic cables communication cables bulk head cable|Y
01|84727|2|3|set external cable set parameter changes service|Y
01|84727|2|4|time and travel|Y
01|84735|2|1|Discount reflects a purchase order of 20 pieces or more|Y
01|84739|2|1|$1000 tool cert on L-N tooling|Y
01|84748|1|1|NCAT50 Shell Mill Holder Taper Plus 1.250 Pilot X 8.0|Y
01|84748|1|2|Gage Length  Part # NC5001-1250-8.00|Y
01|84748|1|3|Net price quoted reflects order of 1~2 tools.|Y
01|84748|2|1|NCAT50 Shell Mill Holder Taper Plus 1.250 Pilot X 8.0|Y
01|84748|2|2|Gage Length  Part # NC5001-1250-8.00|Y
01|84748|2|3|Net price quoted reflects order of 3 tools.|Y
01|84770|1|1|ETA 1-2 WKS|Y
01|84770|2|1|Charge is NET price per piece|Y
01|84781|1|1|3-pcs 1 week/bal 13 Weeks|Y
01|84788|3|1|This is for coolant thru and does accomodate an 8mm|Y
01|84788|3|2|shank|Y
01|84788|9|1|You will need to confirm the sqaure size in addition to|Y
01|84788|9|2|the shank. We do not have an on size for 8mm shank|Y
01|84809|23|1|P&D need|N
01|84821|1|1|****Sold 3pcs yesterday!!|Y
01|84829|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|84846|1|1|1 DEGREE INDEXER WITH HIRTH COUPLING|Y
01|84846|1|2|CONFIRMATION OF MACHINE DATA SHEETS WILL BE NEEDED|Y
01|84846|1|3|CONFIRMATION OF PROPER FIT TO MACHINE|Y
01|84846|1|4|``|N
01|84846|3|1|Includes drive unit bulkhead cables external cables|Y
01|84846|3|2|short bar fiber optic cable communications cable|Y
01|84846|3|3|parameter changes labor travel|Y
01|84861|2|1|I can customize a 21pc collet set for you if needed!|Y
01|84862|2|1|I can customize a 21pc collet set for you if needed!|Y
01|84879|1|1|Ref:TAR-50922|Y
01|84879|1|2|CNCZ321LFA-M  SN#10353|Y
01|84879|1|3|Send in for evaluation.|Y
01|84888|1|1|Ref:TAR-50922|Y
01|84888|1|2|CNCZ321LFA-M  SN#10352|Y
01|84888|1|3|Send in for evaluation.|Y
01|84889|1|1|With special faceplate(REF S/N 4576)|Y
01|84889|2|1|With special faceplate and A06B-2227-B000 motor|Y
01|84889|3|1|with special faceplate|Y
01|84896|12|1|Coming in 25pcs but only 2pcs avail.|N
01|84904|1|1|High Speed table with motor and hydraulic brake.|Y
01|84904|2|1|Air/Hydraulic Booster for table brake system.|Y
01|84904|2|2|Table to be mounted vertically|Y
01|84904|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|84904|3|2|external cable set communication cable fiber optic|Y
01|84904|3|3|cable parameter changes travel and service labor for|Y
01|84904|3|4|installing one rotary table on one Doosan|Y
01|84904|3|5|MYNX 6500 CAT50 TAPER OR MYNX 7500 CAT50 TAPER MACHINE|Y
01|84912|1|1|Ref:RGA#LVR-51018|Y
01|84912|1|2|OKU-L470-X SN#NA|Y
01|84912|1|3|Need to rebuild and resize.|Y
01|84912|2|1|Bearings O-rings Seals Gears Collet Nut need to|Y
01|84912|2|2|replace.|Y
01|84912|2|3|Labor is included.|Y
01|84915|1|1|Ref S/N 1693|Y
01|84918|6|1|EXTERNAL CABLE SET FOR OKUMA NSVZ-300OSP2-M|Y
01|84920|1|1|Ref:MOD-50808|Y
01|84920|1|2|CNCZ180-LSA-BR2  SN#20128T|Y
01|84924|3|1|No Coolant Ports|Y
01|84927|3|1|With Riser to meet CNC-260 Centerheight|Y
01|84934|73|1|*use with SK25-24 collet|Y
01|84934|73|2|**Woodward must machine to desired size|Y
01|84934|83|1|*coolant cap for SK6-4|Y
01|84934|89|1|part# C6-MDSK10-90-J|Y
01|84934|90|1|part# C6-SK10-120U-J|Y
01|84934|107|1|for SK6  collet chucks|Y
01|84934|108|1|for SK10 collet chucks|Y
01|84934|110|1|for SK25 collet chucks|Y
01|84934|111|1|for 1.1/4 Milling Chuck|Y
01|84989|1|1|Special 1 time pricing for Kay MFG|Y
01|84998|1|1|Includes set of external cables|Y
01|85004|1|1|130MM 4th and 5th axis table with Haas motor and cables|Y
01|85015|1|1|Ref:RGA#TAR-510717|Y
01|85015|1|2|5AX-350FA SN#3589|Y
01|85015|1|3|There is a tight spot & customer might be chipped the|Y
01|85015|1|4|worm wheel.|Y
01|85027|1|1|Ref:RGA#TAR-51042|Y
01|85027|1|2|CNC202MA SN#12593T|Y
01|85027|1|3|Send in for full evaluation.|Y
01|85032|1|1|Ref:RGA#TAR-51021|Y
01|85032|1|2|CNCZ180 SN#10077|Y
01|85032|1|3|Send in for full evaluation.|Y
01|85034|21|1|(4) Wrenches above|Y
01|85034|22|1|(4) Wrenches above|Y
01|85037|21|1|(4) Wrenches above|Y
01|85037|22|1|(4) Wrenches above|Y
01|85061|3|1|3 Port rotary union|Y
01|85061|4|1|Base plate for table and support|Y
01|85061|4|2|*** Subject to drawing approval prior to shipment ***|Y
01|85065|7|1|Collet Range .027-.236 - 100mm (3.937) Gage Length|Y
01|85065|9|1|Collet Range .108-.629 - 120mm (4.724) Gage Length|Y
01|85065|10|1|Collet Range .108-.629 - 120mm (5.906) Gage Length|Y
01|85065|12|1|Collet Range .629-1.00 - 135mm (5.315) Gage Length|Y
01|85065|16|1|2.75-16.0mm|Y
01|85087|1|1|Ref:RGA#TAR-50952|Y
01|85087|1|2|5AX-350FA-R36   SN#3518|Y
01|85087|1|3|Axis will not move.|Y
01|85095|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85095|2|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85095|4|1|FREIGHT NOT INCLUDED|Y
01|85111|3|1|This product is given in terms of NET price. No further|Y
01|85111|3|2|discount is to be taken from it!|Y
01|85116|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85116|1|2|Shank and Square:.709x.571|Y
01|85124|1|1|*Substitute with Coolant Collets|Y
01|85126|21|1|*** Balance from prior tool cert = $2869 ***|Y
01|85126|21|2|*** New balance after order = $113.20 ***|Y
01|85135|1|1|Repair for DD250F-150 S/N.1016|Y
01|85135|1|2|Original Problem: Alarm 410 Excess Error|Y
01|85135|2|1|A860-2162-T411 Fanuc Sensor|Y
01|85135|2|2|Brake disc and disc support|Y
01|85135|2|3|Main spindle bearing|Y
01|85135|2|4|O-rings/Bearings/Sealings|Y
01|85135|2|5|Paint for body and side cover|Y
01|85135|2|6|Labor (Repair in Nikken Japan)|Y
01|85139|5|1|12' O.D PULL DOWN CHUCK|Y
01|85139|6|1|12 STANDARD O.D CHUCK|Y
01|85139|9|1|INCLUDING CYLINDER ADAPTER CYLINDER CONNECTOR AND|Y
01|85139|9|2|ANTI-ROTATION BRACKET|Y
01|85139|11|1|INCLUDES DRIVE FIBRE OPTIC CABLES SERVO MOTOR|Y
01|85139|11|2|AMPLIFIER EXTERNAL CABLES TRAVEL INSTRIUCTION|Y
01|85139|11|3|LABOR|Y
01|85159|1|1|1-5 units purchase price|Y
01|85159|2|1|6-10 units purchase price.|Y
01|85160|1|1|Discount is based upon a order of 1~5 holders.|Y
01|85160|2|1|Discount is based upon a order of 6+ holders.|Y
01|85160|3|1|Discount is based upon a order of 1~5 holders.|Y
01|85160|4|1|Discount is based upon a order of 6+ holders.|Y
01|85165|1|1|Item 1: CAT 40 2.5dia face mill|Y
01|85165|2|1|item 2:CAT 40 1/2 power grip for milling|Y
01|85165|4|1|item 3:CAT 40 1/4 power grip for milling|Y
01|85165|6|1|item 4:CAT 40 5/8 power grip for milling|Y
01|85165|8|1|item 5:CAT 40 3/4 power grip for milling|Y
01|85165|9|1|item 6:CAT 40 3/4 end mill holder for drilling approx 1|Y
01|85165|10|1|item 7:CAT 40 3/4 end mill holder for drilling approx 1|Y
01|85165|11|1|item 8:CAT 40 ER32 collet holder (chamfer tool)|Y
01|85165|12|1|item 5:CAT 40 3/4 power grip for milling|Y
01|85165|13|1|item 9:CAT 40 ER32 collet holder (dovetail cutter)|Y
01|85165|14|1|item 7: CAT 40 3/4 end mill holder for drilling approx|Y
01|85165|15|1|item 10: End mill holders for 3/4 shank|Y
01|85165|16|1|item 11:CAT 40 ER25 (small drills and en mills)|Y
01|85165|17|1|item 9:CAT 40 ER32 collet holder (dovetail cutter)|Y
01|85165|18|1|item 12:CAT 40 1 power grip for milling pocket|Y
01|85165|19|1|item 13:CAT 40 1/4 power grip for milling pocket|Y
01|85165|21|1|item 14:CAT 40 1/2 power grip for milling pocket|Y
01|85165|23|1|item 15:CAT 40 3/8 power grip for milling pocket|Y
01|85165|25|1|item 16:CAT 40 12mm power grip for milling pocket|Y
01|85171|1|1|Includes 1 table junction box junction box cable|Y
01|85171|1|2|center divider 2x controller|Y
01|85171|2|1|Includes 2 tables junction box center divider|Y
01|85171|2|2|junction box cable 4x controllers (2x per table)|Y
01|85182|1|1|Ref:RGA#TOR-51076|Y
01|85182|1|2|Repair of FP-2|Y
01|85182|1|3|Sensor has damage & ceramic push button is cracked.|Y
01|85190|1|1|Ref:RGA#TOR-51077|Y
01|85190|1|2|Repair of PF-2.|Y
01|85190|1|3|Send in for evaluation.|Y
01|85190|2|1|Unit need to re-calibrate.|Y
01|85192|1|1|HSK63A Hydraulic 6mm Shank Holder|Y
01|85192|1|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85192|2|1|HSK63A Hydraulic 20mm Shank Holder|Y
01|85192|2|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85196|1|1|Standard Bore(A2-8) package includes Howa 2/3 jaw chuck|Y
01|85196|1|2|A2-8 chuck adapter thread chuck screw for draw tube|Y
01|85196|1|3|and draw tube|Y
01|85200|1|1|Ref:RGA#TAR-51039|Y
01|85200|1|2|Repair of CNCZ180 SN#12336|Y
01|85214|1|1|Ref#RGA#TAR-51098|Y
01|85214|1|2|Repair of CNCZ180SA3 SN#12349|Y
01|85255|2|1|Optional - Can be discussed with engineers prior to ord|Y
01|85256|4|1|************************************************|Y
01|85256|4|2|***** PLEASE SWAP OUT ORIGINAL COLLET NUT  *****|Y
01|85256|4|3|************************************************|Y
01|85278|1|1|Ref:RGA#TAR-51125|Y
01|85278|1|2|Repair of CNC300BMA SN#1021E|Y
01|85278|1|3|making noise and send in for full evaluation.|Y
01|85278|34|1|CNC252B029: Paper gusket|Y
01|85278|35|1|AS2542:Thrust washer|Y
01|85279|2|1|Conversion of CNC100-2W-YA to SA-BR2|Y
01|85279|3|1|$1000 tooling certs|Y
01|85279|4|1|Additional $1000 tooling cert as core trade for older|Y
01|85279|4|2|motors and drives.|Y
01|85281|1|1|CNC302OSP4-M Rotary Table for MA control|Y
01|85288|3|1|RETENTION KNOB FOR M560 WITH CAT 40 TAPER|Y
01|85288|3|2|ALSO FOR OTHER OKUMA MACHINES|Y
01|85288|5|1|RETENTION KNOB FOR M560V WITH CAT 50|Y
01|85288|5|2|OTHER OKUMA MAODELS ALSO|Y
01|85288|7|1|SAMPLE TOOL CERT|Y
01|85292|1|1|Ref:RGA#TAR-51033|Y
01|85292|1|2|Reapir of 5AX-201YA-M SN#4288|Y
01|85292|1|3|Axis is not homing out correctly.|Y
01|85301|1|1|Ref:RGA#TAR-50968|Y
01|85301|1|2|Repair of 5AX-100FA-M  SN#1013|Y
01|85301|1|3|Excessive backlash in the tilt axis.|Y
01|85306|1|1|HSK63A-SK20C-135|Y
01|85306|8|1|SKJ25-6C|Y
01|85306|11|1|Optional to order if do not already have|Y
01|85308|1|1|**** Ideal for application ****|Y
01|85308|2|1|**** Economic option ****|Y
01|85308|3|1|**** Could get by using for 1pc ****|Y
01|85309|16|1|Retention knob quoted at $10.00 net each with the|Y
01|85309|16|2|purchase of a matching taper holder.|Y
01|85311|8|1|*Sub for T10-056  *can be used in non-coolant apps|Y
01|85311|10|1|*Sub for NT10-056  *can be used in non-coolant apps|Y
01|85320|1|1|Quotation for Repair|Y
01|85320|1|2|** Not to exceed above amount **|Y
01|85320|1|3|CNCZ105LSA-BR S/N 1140|Y
01|85320|1|4|Price above includes Repair plus repl motor/Cable|Y
01|85327|1|1|MNL12-ER20-FA-45|Y
01|85327|1|2|BMT60 ER20 45 Deg Fixed Angle Tool|Y
01|85327|1|3|1:2 Gear Ratio - 6K Input - 12K Output|Y
01|85327|1|4|Max: 20Nm Torque|Y
01|85333|5|1|Net price reflects holders installed with SKN-16BJ|Y
01|85333|5|2|coolant nut.|Y
01|85333|12|1|Net price reflects holders installed with SKN-10BJ|Y
01|85333|12|2|coolant nut.|Y
01|85336|2|1|Quoted as NET pricing|Y
01|85342|1|1|BMT65; ER32; X-Axis; L1=65mm old version sword drive|Y
01|85342|1|2|tang 1:1 Gear Ratio; 10000 RPM; max 70Nm torque|Y
01|85342|1|3|IntC & ExtC max p=1015PSI Ref drwg# 00048630|Y
01|85342|1|4|Non-returnable Non-cancelable|Y
01|85354|18|1|Standard list price is $380.00|Y
01|85355|4|1|EXTERNAL CABLE SET|Y
01|85355|4|2|NO 4TH AXIS INTERFACE QUOTED. CHECKING WITH ENGINEERING|Y
01|85363|1|1|CAT50 1/2 Shrink Fit 3.15GL Coolant Port-Balanceable|Y
01|85363|1|2|High Speed-G2.5 rating|Y
01|85363|1|3|Quoted as NET pricing Non-cancelable Non-returnable|Y
01|85373|3|1|This item is not a standard stock piece and therefore|Y
01|85373|3|2|considered a Special. Once an order is placed with|Y
01|85373|3|3|factory it may not be canceled or returned.|Y
01|85389|1|1|Includes Cable Set|Y
01|85397|1|1|Ref:RGA#LVR-51095|Y
01|85397|1|2|Repair of OKL3-ER32X SN#AL875|Y
01|85397|2|1|Collet Nut Bearings Seals Minor Parts|Y
01|85397|2|2|Labor is included.|Y
01|85397|4|1|Ref:RGA#LVR-51095|Y
01|85397|4|2|OKL3-ER32X SN#AL935|Y
01|85397|5|1|Collet Nut Bearings Seals Minor Parts|Y
01|85397|5|2|Labor is included.|Y
01|85401|2|1|Cable setup to 10 feet (for both axis)|Y
01|85401|4|1|Nikken Premeir TaperPlus SK Collet Chuck Pkg:|Y
01|85401|4|2|(2) NCAT40-SK16C-90U-IDU|Y
01|85401|4|3|(2)NCAT40-SK16C-120U-IDU|Y
01|85401|4|4|(4)SK16-1/2A  Collet|Y
01|85401|4|5|(1)9HC16 Wrench|Y
01|85411|1|1|Ref:RGA#LVR-51091|Y
01|85411|1|2|Repair of OK101-13000 SN#A2706|Y
01|85411|1|3|Crack in threaded output spindle.|Y
01|85411|2|1|Spindle Bearings Seals Minor Parts Collet Nut|Y
01|85411|2|2|Labor is included.|Y
01|85417|2|1|Requires hydraulic unit for the barke system.|Y
01|85417|3|1|Requires hydraulic unit for the barke system.|Y
01|85417|5|1|Installation includes: Drive unit short bar fiber|Y
01|85417|5|2|optic cable communications cable bulkhead cables|Y
01|85417|5|3|external cables parameter changes service time and|Y
01|85417|5|4|travel.|Y
01|85442|4|1|EXTERNAL CABLE SET|Y
01|85442|4|2|NO 4TH AXIS INTERFACE QUOTED. CHECKING WITH ENGINEERING|Y
01|85487|1|1|Mazak #53308020200|Y
01|85487|2|1|Mazak #53308020600|Y
01|85491|1|1|****Sold 3pcs yesterday!!|Y
01|85513|1|1|NB3006-0312-2.36  Taper Plus BT30 5/16 End Mill Holder|Y
01|85513|2|1|NB3006-0187-2.36  Taper Plus BT30 3/16 End Mill Holder|Y
01|85519|6|1|HSK100A-1000-8.00|Y
01|85519|7|1|HSK100A-0500-2.63|Y
01|85519|10|1|HSK100A-0500-8.00|Y
01|85519|13|1|HSK100A-0375-8.00|Y
01|85519|14|1|HSK100A-0250-2.50|Y
01|85519|17|1|HSK100A-0250-8.00|Y
01|85522|3|1|BT45-SK16-150|Y
01|85522|3|2|BT45 SK16 Slim Chuck|Y
01|85522|4|1|BT45-SK25-90|Y
01|85522|4|2|BT45 SK16 Slim Chuck|Y
01|85527|1|1|Collet Range 1/32 - 17/64|Y
01|85527|5|1|Collet Range 1/32 - 13/32|Y
01|85528|18|1|11pcs stock remaining balance aprox ETA 1/15/2017|Y
01|85531|2|1|**10pcs stock 2pcs in route delivery TBD|Y
01|85531|2|2|Lyndex-Nikken will provide equivalent tooling as|Y
01|85531|2|3|consignment until balance arrives at end user.|Y
01|85543|1|1|Ref:RGA#LVR-51111|Y
01|85543|1|2|Repair of MNL12-ER32-MS SN#A1842|Y
01|85543|1|3|Tool is crashed.|Y
01|85543|2|1|Bearings Seals O-rings Minor parts Collet Nut|Y
01|85543|2|2|Gears Spindles need to replace.|Y
01|85543|2|3|Labor is included.|Y
01|85554|2|1|*possible sub with coolant port version at same price|Y
01|85556|1|1|Ref:RGA#TAR-51078|Y
01|85556|1|2|Repair of CNCZ202 SN#12042|Y
01|85556|1|3|Table is getting hung up in moving to certain position.|Y
01|85558|4|1|Nut Wrench|Y
01|85558|5|1|Spindle Wrench|Y
01|85582|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85582|2|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85582|3|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85582|4|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85582|5|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85582|6|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85582|7|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85582|8|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85585|1|1|Ref:RGA#TAR-51021|Y
01|85585|1|2|CNCZ180 SN#10077|Y
01|85585|1|3|Send in for full evaluation.|Y
01|85587|1|1|GKN UNV#423|Y
01|85587|1|2|Net price reflects purchase order of 50~100 pieces|Y
01|85587|2|1|GKN UNV#423|Y
01|85587|2|2|Net price reflects purchase order of 100+ piece.|Y
01|85589|1|1|GKN UNV#423|Y
01|85591|1|1|GKN UNV#423|Y
01|85592|1|1|GKN UNV#423|Y
01|85593|1|1|GKN UNV#423|Y
01|85594|1|1|GKN UNV#423|Y
01|85595|1|1|Repair of TAT-170|Y
01|85595|1|2|Reference RGA# TAR-51150|Y
01|85608|1|1|HSK63A End Mill 20MM Diameter 60mm GL|Y
01|85608|1|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85617|2|1|*possible sub with coolant port version at same price|Y
01|85626|1|1|*AXIAL TOOL*|Y
01|85642|1|1|320MM face plate with shortest cover posible|Y
01|85642|3|1|PBA-170 Tailstock with MT#4 center socket.|Y
01|85642|3|2|Note the tail stock and table center height do not|Y
01|85642|3|3|match. Sub plate not included.|Y
01|85645|10|1|Uses same wrenches as the lines 8 and 9|Y
01|85652|1|1|L2: 5 shank length|Y
01|85652|1|2|*no flat|Y
01|85654|2|1|*** Answers line item #1 ***|Y
01|85659|1|1|**Please confirm NL has a 12 station turret prior to|Y
01|85659|1|2|order placement**|Y
01|85665|1|1|Part# 530-SP 5C Hex Collets with Step Bore|Y
01|85665|1|2|Non-returnable Non-cancelable Quoted as NET pricing|Y
01|85673|1|1|Table with Fanuc motor and AIR brake.|Y
01|85673|2|1|Installation Includes: Drive amp bulkhead cable set|Y
01|85673|2|2|external cable set communication cable fiber optic|Y
01|85673|2|3|cable parameter changes travel and labor for|Y
01|85673|2|4|installation of one 5AX table on one Makino PS105|Y
01|85680|5|1|sub for C5026-0500-6.00|Y
01|85706|1|1|Big Bore (A2-11) package includes Howa 2/3 jaw chuck|Y
01|85706|1|2|A2-8 chuck adapter thread chuck screw for draw tube|Y
01|85706|1|3|and draw tube(HW-DTUBE-SP cylinder (C1TA-190CD) and|Y
01|85706|1|4|the cylinder apapter plate (PC-CTYL-ADPT-SP)|Y
01|85724|1|1|HOT DEALS PRICE TO End User = $144.00 on website|Y
01|85724|2|1|HOT DEALS PRICE TO End User = $108.00 on website|Y
01|85730|1|1|*requires threads for coolant tubes|Y
01|85730|2|1|*requires threads for coolant tubes|Y
01|85744|1|1|Tool-Cert Number 1195-1072-112117|Y
01|85754|1|1|Repair of TAT-500 s/n: 2500|N
01|85754|1|2|Reference RGA# TAR-50905|Y
01|85754|10|1|Replaces AS568-277|Y
01|85754|10|2|In bin labelled as AS568-277|N
01|85791|1|1|C40RAM-ER32-180IC-65TP ER32 Angle Head with Internal|Y
01|85791|1|2|coolant  and taper positioning pin.|Y
01|85791|7|1|Net price quoted.|Y
01|85799|1|1|Tool Certificate #6475-1069-111017|Y
01|85799|2|1|Should ship by end of 1/15/2018 week|Y
01|85805|1|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|85805|1|2|External Cables Service Time and Travel.|Y
01|85805|2|1|Includes Manual Tailstock 12 Scroll Chuck and CAT40|Y
01|85805|2|2|ER Collet Chuck Starter Package - 12 Holders|Y
01|85806|1|1|WITH EXTERNAL CABLES|Y
01|85824|1|1|Repair of CNCZ202LFA s/n: 12053T|N
01|85824|1|2|Reference RGA# TAR-51059|Y
01|85826|5|1|ABOVE P/N REPLACES TCD-37206|Y
01|85827|1|1|90-90 5m external power cable|Y
01|85827|2|1|90-90 5m external feedback cable|Y
01|85828|1|1|Repair of CNC601 s/n: 6249|N
01|85828|1|2|Reference RGA# TAR-50905|Y
01|85845|2|1|External cable set from table to bulkhead|Y
01|85849|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85849|2|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|85854|1|1|Howa H01-MA12 Close center 3-jaw chuck|Y
01|85867|7|1|Balance due to ship 1st week of February.|Y
01|85869|3|1|Okuma cable set.|Y
01|85885|1|1|Net price reflects a purchase order of 1~9 holders.|Y
01|85885|2|1|Net price reflects a purchase order of 10+ holders.|Y
01|85885|18|1|Net price reflects a purchase order of 1~9 holders.|Y
01|85885|19|1|Net price reflects a purchase order of 10+ holders.|Y
01|85885|33|1|Net price reflects a purchase order of 1~9 holders.|Y
01|85885|34|1|Net price reflects a purchase order of 10+ holders.|Y
01|85893|1|1|S20T-SK10-45 BT20 Short Taper SK10 Chuck 45mm Gage|Y
01|85893|3|1|S20T-SK16-75   BT20 Short Taper SK16 Chuck 75mm Gage|Y
01|85894|1|1|S20T-SK10-45 Short Taper SK10 Chuck 45mm Gage|Y
01|85894|3|1|S20T-SK16-75  BT20 Short Taper SK16 Chuck 75mm Gage|Y
01|85897|1|1|LN Part #HW-SJ-12-LS-3S-60Howa part #H023M15 Soft Jaw|Y
01|85897|1|2|1 set includes 3 pcs works with A2-8 std & A2-11 big|Y
01|85897|1|3|bore as referened on Quotes #85196/85706|Y
01|85906|1|1|Includes nut swap modification for coolant capable|Y
01|85906|16|1|Includes the nut swap modification for coolant capable|Y
01|85925|1|1|Reference RGA# CUR-51106|Y
01|85925|1|2|C40RAM-ER32-180 s/n: 4510101|Y
01|85925|2|1|Bearings seals and o-rings are worn must be|Y
01|85925|2|2|replaced.|Y
01|85925|2|3|Pricing includes labor.|Y
01|85932|1|1|Special net price reflects non returnable tooling.|Y
01|85948|1|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|85948|1|2|External Cables AY0200 Air/Hydraulic Booster and|Y
01|85948|1|3|Service Time and Travel|Y
01|85957|1|1|Please add the -IDU to your part #.This is the same|Y
01|85957|1|2|part with a new # to indicate it now has the ability|Y
01|85957|1|3|to place an ID chip on the holder|Y
01|85962|1|1|HSK40A-HC4-4.50 SPECIAL HYDRAULIC CHUCK WITH|Y
01|85962|1|2|NOSE DIAMETER NO LONGER THAN .85|Y
01|85965|5|1|Installation includes: drive unit short bar fiber|Y
01|85965|5|2|optic cables communication cables bulk head cable|Y
01|85965|5|3|set external cable set parameter changes service|Y
01|85965|5|4|time and travel|Y
01|85965|10|1|Lever actuated hydraulic unit to charge actuator|Y
01|85965|10|2|**If M-code preferred remove and set NACHI qty of (2)|Y
01|85965|11|1|Installation includes: drive unit short bar fiber|Y
01|85965|11|2|optic cables communication cables bulk head cable|Y
01|85965|11|3|set external cable set parameter changes service|Y
01|85965|11|4|time and travel|Y
01|85979|3|1|PART-MIM-182182 Item #19|Y
01|85979|13|1|PART-MIM-114025|Y
01|85988|1|1|Ref:RGA#LVR-51019|Y
01|85988|1|2|Repair of MZMP47-ER32X-OFF SN#73900 08|Y
01|85988|1|3|Need to size up.|Y
01|85988|2|1|Need to replace all bearings seals and o-rings.|Y
01|85988|2|2|Labor is included.|Y
01|85991|15|1|HSK63F-MMC12C-165  NO QUOTE - GEAR ISSUE PROHIBITS|Y
01|85991|18|1|HSK63F-MMC12C-159AA|Y
01|85991|19|1|HSK63F-MMC12C-189AA|Y
01|85995|2|1|Includes drive unit interface cables external cables|Y
01|85995|2|2|fiber optic cable short bar travel labor and expense|Y
01|86000|1|1|Internal Nut|Y
01|86000|2|1|Internal Nut|Y
01|86000|5|1|External Nut|Y
01|86000|6|1|External Nut|Y
01|86007|1|1|Repair of TAT-170|Y
01|86007|1|2|Reference RGA# TAR-51150|Y
01|86012|1|1|Delv = 3pcs - 5 weeks & balance = 10 weeks|Y
01|86018|2|1|Offering additionl 5% for  HSK63A-C1-100 used inventory|Y
01|86059|1|1|TT35-MT3|Y
01|86074|3|1|upon final information on spindle drawing|Y
01|86096|2|1|Delivery on 1pc pending with Nikken Japan.|Y
01|86102|1|1|C5036-0500A-8.00 CAT50 1/2 End Mill Holder with|Y
01|86102|1|2|Whistle Notch >>Net price quoted 2 pieces.|Y
01|86102|2|1|C5036-0500A-8.00 CAT50 1/2 End Mill Holder with|Y
01|86102|2|2|Whistle Notch >> Net price quoted 5~9 piece order.|Y
01|86102|3|1|C5036-0500A-8.00 CAT50 1/2 End Mill Holder with|Y
01|86102|3|2|Whistle Notch >> Net price quoted 10+ piece order.|Y
01|86105|1|1|C5006-1000A-3.562|Y
01|86118|7|1|ZKN8-1/8|Y
01|86118|8|1|ZKN8-3/16|Y
01|86118|9|1|ZKN8-1/4|Y
01|86118|10|1|ZKN38-20|Y
01|86118|11|1|ZKN38-22|Y
01|86118|14|1|ZKN38-7/8|Y
01|86118|15|1|ZKN38-1|Y
01|86118|16|1|ZKN38-1.1/4|Y
01|86118|17|1|ZKN38-3/8P|Y
01|86118|18|1|ZKN38-1/2P|Y
01|86118|19|1|ZKN38-5/8P|Y
01|86121|3|1|FLAT RATE|Y
01|86121|5|1|FLAT RATE|Y
01|86130|1|1|Price based on 90 pcs QTY purchased in full|Y
01|86130|2|1|Price based on 90 pcs QTY purchased in full|Y
01|86130|3|1|Price based on 90 pcs QTY purchased in full|Y
01|86188|1|1|Ref:RGA#TOR-51178|Y
01|86188|1|2|Repair of PF-2|Y
01|86188|1|3|Send in for evaluation.|Y
01|86197|1|1|MZQT5-ER32Z-MS-ICE|Y
01|86197|1|2|Main Sun ER32 Z Axis Head|Y
01|86197|1|3|*Net price|Y
01|86199|1|1|Tooling Certificate Number: E13625-981-060117|Y
01|86201|1|1|More then 1 PC needed will be ETA 9-10 WKS|Y
01|86201|1|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|86204|1|1|MZCT12-ER32-ADJ|Y
01|86204|1|2|VDI50; ER32; Adjustable Angle 0-90deg; L1=104.5mm;|Y
01|86204|1|3|external coolant supply over pipe 1:1 Gear ratio;|Y
01|86204|1|4|max torque 35Nm; max 6500 RPM; output is reversal to|Y
01|86204|1|5|input. Ref drwg# 00023653|Y
01|86204|1|6|8-27-18 Hiro test line comment. No show|N
01|86204|2|1|MZCT12-ER32-ADJ|Y
01|86204|2|2|See above for description|Y
01|86218|1|1|Ref:RGA#TAR-51137|Y
01|86218|1|2|Repair of CNC202L-SA3 SN#12471|Y
01|86218|1|3|Brake does not hold.|Y
01|86221|2|1|CABLES WILL BE INCLUDED|Y
01|86221|8|1|$ 1000 tool LYNDEX NIKKEN TOOL CERTIFICATE (LIST PRICE|Y
01|86224|2|1|CABLES WILL BE INCLUDED|Y
01|86228|1|1|Qty 1-10pcs|Y
01|86228|2|1|Qty 11-20+pcs|Y
01|86230|1|1|Tooling Certificate Number: 13170-1054-102417|Y
01|86233|1|1|Replacement for # HH960C115HE M478 R-Cylinder|Y
01|86249|1|1|C5006-1000A-3.562|Y
01|86250|1|1|C5006-1000A-3.562 UNV#647|Y
01|86251|1|1|C5006-1000A-3.562 UNV#647|Y
01|86254|1|1|GKN UNV#423|Y
01|86254|1|2|Net price reflects purchase order of 50~100 pieces|Y
01|86254|2|1|GKN UNV#423|Y
01|86254|2|2|Net price reflects purchase order of 100+ piece.|Y
01|86265|1|1|Tooling Certificate Number:TBD|Y
01|86270|1|1|QCFC Series 80 11/16 Roundcrossing from Royal part|Y
01|86270|1|2|#4441711/16 (.687) QG-80 Collet|Y
01|86271|1|1|HSK40A-SK6-90|Y
01|86271|1|2|HSK40A taper SK6 with 90mm gage length|Y
01|86271|2|1|HSK40A-SK6-120|Y
01|86271|2|2|HSK40A Taper SK6 with 120mm gage length|Y
01|86287|1|1|Delivery on 2pcs is pending at this time.|Y
01|86301|1|1|Balance of holders would be a 12-14 week lead time|Y
01|86305|4|1|BT40-Q12-110  BT40 Modular Boring Base/Master Holder|Y
01|86305|10|1|16-BCB38-55  BCB Boring Head|Y
01|86305|12|1|BT40-Q20-80  BT40 Modular Boring Base/Master Holder|Y
01|86305|13|1|20-BCB48-70 BCB Boring Head|Y
01|86319|2|1|Sub-plate required|Y
01|86319|3|1|**Budgetary figure**|Y
01|86319|3|2|Includes actuating cylinder and trammable adapter plate|Y
01|86331|1|1|Prep with Pnematic braking|Y
01|86331|3|1|Credit for existing motors|Y
01|86344|1|1|Quoted as NET pricingNon-cancelableNon-returnable|Y
01|86344|2|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|86344|2|2|Shank and Square:.709x.571|Y
01|86346|1|1|13687-1084-120817|Y
01|86346|1|2|13687-1085-120817RT|Y
01|86363|17|1|This item is not standard stock and considered special|Y
01|86363|18|1|NCAT40-SF1000-5.12CP|Y
01|86363|18|2|This item is not standard stock and considered special|Y
01|86370|1|1|86PC STOCK BALANCE APROX 2 WEEKS AFTER PO SUBMIT.|Y
01|86370|3|1|16pc stock remaining balance ETA aprox 2 weeks|Y
01|86382|1|1|Includes adapter plate|Y
01|86382|2|1|Includes adapter plate|Y
01|86382|3|1|Includes adapter plate|Y
01|86394|3|1|Installation includes: drive unit short bar fiber|Y
01|86394|3|2|optic cables communication cables bulk head cable|Y
01|86394|3|3|set external cable set parameter changes service|Y
01|86394|3|4|time and travel|Y
01|86398|1|1|Includes cables and rotary joints|Y
01|86400|1|1|*non-coolant to hold #11|Y
01|86402|3|1|Offered only 3/4 shank dia|Y
01|86407|2|1|.531 Drill|Y
01|86407|3|1|.640 & .656 Drill|Y
01|86407|5|1|.|N
01|86418|1|1|B50FHM-MI63-225-80TP (MI63=ER40) 4-26mm|Y
01|86418|1|2|Special Order. Unit Price Each.|Y
01|86418|1|3|Special Connection Pin cost included.|Y
01|86418|2|1|B50FHM-MI63-225-80TP (MI63=ER40) 4-26mm|Y
01|86418|2|2|Special Order. Unit Price Each.|Y
01|86418|2|3|Special Connection Pin & 3 Support Pin cost included.|Y
01|86418|15|1|Parts#: 400-562|Y
01|86418|15|2|ER40 axial compensating tap collet for a 1/4-19 BSP|Y
01|86418|15|3|Unit Price Each. Special Order.|Y
01|86445|1|1|unit price per unit.|Y
01|86445|1|2|not cancelable due to special order once PO issued|Y
01|86451|7|1|CAT40 taper ER25;45 deg fixed Angle Head; Standard|Y
01|86451|7|2|torque Arm ISO 9524;A=65mm;d=20mm; SW18 NO Coolant|Y
01|86451|7|3|supply; reversal of rotation direction; input is|Y
01|86451|7|4|reversal to output; 1:1 Gear ratio; max 8000RPM|Y
01|86451|7|5|max torque M=30Nm; Ref drwg#00053434|Y
01|86451|8|1|description above|Y
01|86451|9|1|description above|Y
01|86457|46|1|Coolant cap must be modified by user to 24mm hole|Y
01|86465|9|1|4TH INTERFACE INCLUDES DRIVE CABLES FIBRE OPTICS|Y
01|86465|9|2|TRAVEL AND LABOR|Y
01|86465|9|3|MACHINE DATA SHEETS REQUIRED|Y
01|86503|1|1|Haas Live X/Z ADJ ER20 4000rpm DIN|Y
01|86515|6|1|Upon final receipt of spindle drawing info|Y
01|86515|6|2|Machine: Toyoda 1250 HMC|Y
01|86517|4|1|$3000 credit for motors cables and covers|Y
01|86519|1|1|Fits SKJ16-14C Coolant Cap shown in picture.|Y
01|86519|2|1|Fits CKFN25(1)-20C Coolant Nut shown in picture.|Y
01|86522|14|1|***NO CHARGE***|Y
01|86522|15|1|***NO CHARGE***|Y
01|86530|4|1|*if required|Y
01|86550|1|1|N50-TESTBAR-12.00  NMTB50 Testbar 0.0002 runout TIR|Y
01|86550|1|2|12.0 Gage Length|Y
01|86553|3|1|YA Model same price|Y
01|86553|3|2|HAAS to supply SERVO motor|Y
01|86555|2|1|INCLUDES EXTERNAL CABLES. FOR NEW MACHINE OSP4 MODEL|Y
01|86555|2|2|THIS IS SAME PRICE. TO BE CONFIRMED AT TIME OF ORDER|Y
01|86555|4|1|INCLUDES EXTERNAL CABLES. FOR NEW MACHINE OSP4 MODEL|Y
01|86555|4|2|THIS IS SAME PRICE. TO BE CONFIRMED AT TIME OF ORDER|Y
01|86555|6|1|INCLUDES EXTERNAL CABLES. FOR NEW MACHINE OSP4 MODEL|Y
01|86555|6|2|THIS IS SAME PRICE. TO BE CONFIRMED AT TIME OF ORDER|Y
01|86555|11|1|2 NEEDED FOR CNCZ-2W|Y
01|86555|11|2|3 NEEDED FOR CNCZ-3W|Y
01|86555|11|3|4 NEEDED FOR CNCZ-4W|Y
01|86579|1|1|Above item is non-returnable|Y
01|86579|4|1|Above item is non-returnable|Y
01|86586|1|1|We have 4pcs in stock. I will need to confirm lead on|Y
01|86586|1|2|the balance.|Y
01|86586|2|1|H63A-SF0187-3.15 or 3.54 Length|Y
01|86653|3|1|Installation includes: Dual axis drive unit short bar|Y
01|86653|3|2|fiber optic cablescommunications cables bulkhead|Y
01|86653|3|3|cables external cables parameter changes service|Y
01|86653|3|4|time and travel.|Y
01|86661|9|1|*confirm drawing for Yama Seiki machine|Y
01|86661|9|2|***promo pricing - qty to match CAT50 holders|Y
01|86661|10|1|*confirm drawing for Yama Seiki machine|Y
01|86669|1|1|with PS-N46AE|Y
01|86669|2|1|with PS-N46AE|Y
01|86673|1|1|Ref: RGA#TAR-51186|Y
01|86673|1|2|Repair of CNCZ202FA-M SN#11171|Y
01|86673|1|3|Sendin for evaluation.|Y
01|86674|1|1|CNCZ202FA-M s/n: 11170|N
01|86674|1|2|Reference RGA# TAR-51186 1 of 2|Y
01|86674|24|1|Expedite fee quoted to have completed and ready to|Y
01|86674|24|2|ship by 1/25/18.|Y
01|86681|1|1|Howa # H011MC5(replaces Ho11MB5)|Y
01|86681|1|2|Non standard stock item.Not cancelable or returnable|Y
01|86681|1|3|once an order is placed|Y
01|86686|2|1|Pending receipt of questionairre and confirmation of|Y
01|86686|2|2|application|Y
01|86686|3|1|Quoted as NET pricing|Y
01|86686|3|2|Requires spindle nose drawing and picture of spindle|Y
01|86695|27|1|BT30-MMC8C-105-AA Bevel Gear style holder|Y
01|86695|28|1|NBT30-MMC8C-105-AA Bevel Gear style holder|Y
01|86695|29|1|NBT30-VC13-60-J Actual Part number with VCN-13BJ Coolnt|Y
01|86695|29|2|Nut installed here prior to ship. Please be certain to|Y
01|86695|29|3|order using this NBT30-VC13-60-J part number****|Y
01|86695|30|1|NBT30-MDSK16-75P-J is actual Part# with MDSKN-16BJ|Y
01|86695|30|2|Hi-Speed Coolant Nut installed prior to shipping.|Y
01|86695|30|3|**Please be certain to use NBT30-MDSK16-75P-J when you|Y
01|86695|30|4|order.**|Y
01|86695|31|1|BT30-SK16-60P-J is actual Part# with SKN-16BJ(GH)|Y
01|86695|31|2|Hi-Speed Coolant Nut installed prior to shipping.|Y
01|86695|31|3|**Please be certain to use BT30-SK16-60P-J when you|Y
01|86695|31|4|order.**|Y
01|86695|32|1|BT30-SK16-90P-J is actual Part# with SKN-16BJ(GH)|Y
01|86695|32|2|Hi-Speed Coolant Nut installed prior to shipping.|Y
01|86695|32|3|**Please be certain to use BT30-SK16-90P-J when you|Y
01|86695|32|4|order.**|Y
01|86695|36|1|NBT30-VC13-90-J is actual Part# with VCN-13BJ|Y
01|86695|36|2|Hi-Speed Coolant Nut installed prior to shipping.|Y
01|86695|36|3|**Please be certain to use NBT30-VC13-90-J when you|Y
01|86695|36|4|order.**|Y
01|86695|41|1|BT30-SK10-90P-J is actual Part# with SKN-10BJ(GH)|Y
01|86695|41|2|Hi-Speed Coolant Nut installed prior to shipping.|Y
01|86695|41|3|**Please be certain to use BT30-SK10-90P-J when you|Y
01|86695|41|4|order.**|Y
01|86703|2|1|EXTERNAL CABLES SET|Y
01|86703|5|1|COMPLETE 4TH AXIS INSTALLATION INCLUDING DRIVE FIBRE|Y
01|86703|5|2|OPTICS ALL CABLES TO BULKHEAD TRAVEL TRAINING|Y
01|86725|1|1|Ref:RGA#TOR-51151|Y
01|86725|1|2|Repair of BT40-MMC8-90 (3pcs)|Y
01|86725|1|3|Internal gear is not working propery|Y
01|86726|3|1|NET PRICING|Y
01|86726|3|2|INCLUDES ALL DRIVES CABLES CENTER DIVIDER ETC|Y
01|86729|18|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|86729|18|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|86729|18|3|THIS COST DOES NOT INCLUDE ANY PARAMETERS THAT FANUC|Y
01|86729|18|4|MAY NEED TO INSTALL. THIS CANNOT BE DETERMINED TILL|Y
01|86729|18|5|WE RECEIVE MACHINE DATA SHEETS ARE RECEIVED|Y
01|86729|18|6|THERE IS A POSSIBILITY THAT OUR TECH WILL BE ABLE TO|Y
01|86729|18|7|TURN ON.|Y
01|86730|3|1|Interface kit for installation of rotary table|Y
01|86730|3|2|includes drive unit interface/external cables fiber|Y
01|86730|3|3|optic cable short bar please note: data sheets from|Y
01|86730|3|4|the machine will be required in order to prepare|Y
01|86730|3|5|correctly|Y
01|86735|1|1|Ref:RGA#TAR-51110|Y
01|86735|1|2|Repair of 5AX-4MT-120|Y
01|86735|1|3|Need to rebuild and repair.|Y
01|86738|1|1|Option#1- 187990: Support Plate for housing 109mm dia;|Y
01|86738|1|2|Torque arm center distance A=80mm: pin 28mm dia;|Y
01|86738|1|3|Replace for part in AGH# 178126; new AGH# 192464|Y
01|86738|2|1|Option#2- 187556: Support plate for housing 109mm dia;|Y
01|86738|2|2|Torque arm center distance A=80mm; pin 18mm dia;|Y
01|86738|2|3|Replace for part in AGH#178126; NEW AGH#192465|Y
01|86766|2|1|STANDARD FEEDBACK CABLE WE ALWAYS SUPPLY METHODS|Y
01|86766|3|1|STANDARD POWER CABLE ALWAYS SUPPLIED TO METODS|Y
01|86766|5|1|STEEL BRAIDED/ 4-6 WEEK DELIVERY|Y
01|86766|6|1|STEEL BRAIDED  4-6 WEEK DELIVERY|Y
01|86769|1|1|BT30-C16-55G|Y
01|86774|2|1|THIS ITEM QUOTED PER SPINDLE|Y
01|86775|1|1|Quoted at Net price.|Y
01|86797|3|1|Installation includes: Dual axis drive short bar|Y
01|86797|3|2|fiber optic cable communications cables bulkhead|Y
01|86797|3|3|cables external cables parameter changes service|Y
01|86797|3|4|time and travel.|Y
01|86800|1|1|1TH-01567: Screw (M12*L13.5)|Y
01|86800|1|2|Air:1-2 Weeks = $150|Y
01|86813|1|1|CAT40 Balanceable 1/2 Shrink Fit rated G2.5 25000RPM|Y
01|86813|1|2|Coolant Ports 3.15GL|Y
01|86813|1|3|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|86813|2|1|CAT50 Balanceable 1/2 Shrink Fit rated G2.5 25000RPM|Y
01|86813|2|2|Coolant Ports 3.15GL|Y
01|86813|2|3|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|86813|3|1|CAT40 Balanceable 1 Shrink Fit rated G2.5 25000RPM|Y
01|86813|3|2|Coolant Ports 3.94GL|Y
01|86813|3|3|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|86813|4|1|CAT50 Balanceable 1 Shrink Fit rated G2.5 25000RPM|Y
01|86813|4|2|Coolant Ports 3.94GL|Y
01|86813|4|3|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|86815|1|1|NB4001-0750-1.75 Taper Plus BT40 Shell Mill Holder 3/4|Y
01|86815|1|2|arbor with 1.75 gage length|Y
01|86817|1|1|Includes Cable Set|Y
01|86817|2|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|86817|2|2|External Cables Service Time and Travel.|Y
01|86839|2|1|Installation includes: Drive unit short bar fiber|Y
01|86839|2|2|optic cable communication cable bulkhead cable|Y
01|86839|2|3|external cable parameter changes service time and|Y
01|86839|2|4|travel.|Y
01|86853|3|1|Installation includes: drive unit short bar fiber|Y
01|86853|3|2|optic cables communication cables bulk head cable|Y
01|86853|3|3|set external cable set parameter changes service|Y
01|86853|3|4|time and travel|Y
01|86858|1|1|Ref:RGA#TAR-51200|Y
01|86858|1|2|Send in for evaluation.|Y
01|86859|2|1|swap for a SKN-10BJ(GH)|Y
01|86861|2|1|swap for a SKN-10BJ(GH)|Y
01|86872|1|1|Tooling Certificat Number:6475-1116-012518|Y
01|86885|3|1|Hedenhain +/-3 seconds scale with mounting kit|Y
01|86885|4|1|Power and Signal and Feedback cables set.|Y
01|86893|2|5|SPECIAL PRICING PER OUR DISCUSSION|Y
01|86899|8|1|INSTALLATION INCLUDES DRIVE CABLES EXTERNAL CABLES|Y
01|86899|8|2|TRAVEL AND LABOR INCLUDED|Y
01|86899|8|3|CONFIRMATION OF MACHINE LADDER NEEDED AND ADDITIONAL|Y
01|86899|8|4|AXIS NEEDED FROM FANUC ONCE CONFIRM ED BY MACHINE DATA|Y
01|86899|10|1|FREE TOOL CERTIFICATE AT LIST PRICE|Y
01|86918|2|1|STANDARD FEEDBACK CABLE WE ALWAYS SUPPLY METHODS|Y
01|86918|3|1|STANDARD POWER CABLE ALWAYS SUPPLIED TO METODS|Y
01|86918|5|1|STEEL BRAIDED/ 4-6 WEEK DELIVERY|Y
01|86918|6|1|STEEL BRAIDED  4-6 WEEK DELIVERY|Y
01|86928|1|1|Above holder is non-returnable|Y
01|86933|1|1|Ref:RGA#TOR-51250|Y
01|86933|1|2|Repair of PF-2|Y
01|86933|1|3|Send in for evaluation.|Y
01|86933|2|1|Need to calibrate.|Y
01|86953|1|1|Table + drives does not include sheet metal|Y
01|86953|1|2|junction box junction box cable|Y
01|86988|5|1|PLEASE SEE TABLE SPECS ATTACHED|Y
01|86988|7|1|3 + 1 ROTARY UNION (TCD-A3334/1) NEEDED. SEE ATTACHED|Y
01|86990|4|1|THIS TABLE HAS FANUC SERVO MOTOR INCLUDED|Y
01|86990|7|1|THIS TABLE DOES NOT INCLUDE FANUC SERVO MOTOR|Y
01|86990|9|1|3 + 1 ROTARY UNION (TCD-A3334/1) NEEDED. SEE ATTACHED|Y
01|87003|1|1|CAT50-SB1000-8.45-ID-GKN w/ Stub Cap (1-Stubcap) and|Y
01|87003|1|2|Key (FW-1/4).|Y
01|87007|1|1|CAT50-SB1000-8.45-ID-GKN w/ Stub Cap (1-Stubcap) and|Y
01|87007|1|2|Key (FW-1/4).|Y
01|87008|2|1|*5pc min|Y
01|87008|3|1|*5pc min|Y
01|87008|6|1|*5pc min|Y
01|87008|9|1|*10pc set|Y
01|87008|10|1|*5pc min|Y
01|87008|11|1|*5pc min|Y
01|87008|15|1|*5pc min|Y
01|87008|16|1|*5pc min|Y
01|87008|17|1|*5pc min|Y
01|87008|18|1|*5pc min'|Y
01|87008|32|1|*5pc min|Y
01|87008|33|1|*5pc min|Y
01|87052|1|1|Includes drive unit external cables interface cables|Y
01|87052|1|2|fiber optic cables short bar communication cable|Y
01|87052|1|3|travel and expenses|Y
01|87052|2|1|Labor for swapping the spec of the table from Robodrill|Y
01|87052|2|2|to CMX|Y
01|87052|2|3|Table needs to be shipped back to Lyndex Nikken|Y
01|87052|2|4|This is the responsibility of the customer|Y
01|87056|1|1|Ref:RGA#CUR-51197|Y
01|87056|1|2|Reapir of SF-START2-UNIT-200 SN#2J025|Y
01|87056|1|3|Board is burnt blowing breakers.|Y
01|87060|3|1|Includes: drive amp bulk head cable set external|Y
01|87060|3|2|cable set fiber optic cable communication cable|Y
01|87060|3|3|travel and labor for installation.|Y
01|87060|3|4|QUOTE BASED ON 3 INSTALLS AT SAME TIME|Y
01|87076|1|1|*5pc min|Y
01|87103|1|1|1-5 pcs|Y
01|87124|1|1|Need to confirm Sigma 1 or 5|Y
01|87132|1|1|Ref:RGA#TOR-51299|Y
01|87132|1|2|Repair of CAT50-UMT200|Y
01|87137|1|1|K20-SK16-120|Y
01|87142|1|1|Ref:RGA#TOR-51239|Y
01|87142|1|2|Repair of CAT40-Z12-100U|N
01|87142|4|1|3/8 balls|Y
01|87146|2|1|400mm 4-Jaw Independent Chuck|Y
01|87146|3|1|Mounting plate with pilot to locate off TAT-501 support|Y
01|87151|1|1|Net price quoted.|Y
01|87168|1|1|RefL:LVR-51194|Y
01|87168|1|2|OKU-LT15-Z SN#AL003|Y
01|87168|2|1|Bearings Seals Collet Nut Spindle Minor Parts need|Y
01|87168|2|2|to replace.|Y
01|87168|2|3|Labor is included.|Y
01|87168|4|1|OKU-LT15-Z SN#AL002|Y
01|87168|5|1|Bearings Seals Collet Nut Spindle Minor Parts need|Y
01|87168|5|2|to replace.|Y
01|87168|5|3|Labor is included.|Y
01|87168|7|1|OKU-LT15-Z SN#AL004|Y
01|87168|8|1|Bearings Seals Collet Nut Spindle Minor Parts need|Y
01|87168|8|2|to replace.|Y
01|87168|8|3|Labor is included.|Y
01|87168|10|1|OKL3-ER32X SN#AL0437|Y
01|87168|11|1|Bearings Seals Gears Collet Nut Minor Parts need|Y
01|87168|11|2|to replace.|Y
01|87168|11|3|Labor is included.|Y
01|87174|52|1|See below comments|Y
01|87174|53|1|See below comments|Y
01|87200|1|1|MUST CONFIRM PROPER FIT TO MACHINE|Y
01|87200|1|2|HYDRAULIC UNIT FOR BRAKE INCLUDED|Y
01|87207|1|1|Discount reflects a purchase order of 1 ~4 holders.|Y
01|87207|3|1|Discount reflects a purchase order of 6~9 Holders.|Y
01|87207|5|1|Discount reflects a purchase order of 10+ Holders.|Y
01|87228|6|1|for .234|Y
01|87233|2|1|Adapter plate for R-4 for 5AX-100|Y
01|87234|2|1|Adapter plate for 5C Manual for 5AX-100|Y
01|87238|1|1|Installed w/ PS-123E at factory|Y
01|87238|2|1|Installed on NC5-46-SK16C-90|Y
01|87238|5|1|Installed on NC5-46-FMA25.4C-80S|Y
01|87253|1|1|PBA-150 confirmation switches with cover plate.|Y
01|87287|1|1|Reference RGA# TAR-51132|Y
01|87287|1|2|5AX-350FA-R36 s/n: 3225|N
01|87287|23|1|Tilt Axis Motor Cover|Y
01|87287|24|1|Rotary Axis Motor Cover|Y
01|87300|1|1|Includes drive unit interface/external cable fiber|Y
01|87300|1|2|optic cable short bar travel labor solenoid for|Y
01|87300|1|3|TAT-250|Y
01|87310|1|1|1set/3pcs|Y
01|87328|2|1|Quoted at net price.|Y
01|87330|2|1|Convert CNCZ100-2W-120YA-BR-M > CNCZ100-2W-120OSP4-M|Y
01|87330|3|1|2-port rotary union (2 each table)|Y
01|87332|4|1|Mini manifold and setup|Y
01|87336|1|1|Discount reflects purchase order of 6 holders.|Y
01|87336|2|1|Discount reflects purchase order of 7~10 holders.|Y
01|87336|4|1|Discount reflects purchase order of 6 holders.|Y
01|87336|5|1|Discount reflects purchase order of 7~10 holders.|Y
01|87365|5|1|External cable sets.|Y
01|87373|1|1|C50RAM-ER50-215-110TP CAT50; ER50; AGH 360deg ADJ:|Y
01|87373|1|2|Taper pin;Torque arm A=110mm / d=28mm;|Y
01|87373|1|3|L=215mm / L1=105mm  No coolant supply.|Y
01|87373|1|4|Reversal of rotation direction;1:1 Gear ratio;|Y
01|87373|1|5|max torque M=150Nm; 5000 RPM Ref drwg# 00053526|Y
01|87373|1|6|Net price quoted.|Y
01|87373|3|1|C50RAM-ER50-215-110TP CAT50; ER50; AGH 360deg ADJ;|Y
01|87373|3|2|Taper pin; Torque arm A=110mm/d=28mm;L=215mm / L1=105mm|Y
01|87373|3|3|No coolant supplyReversal of rotation direction;|Y
01|87373|3|4|1:1 Gear ratio; max torque M=150Nm; 5000 RPM|Y
01|87373|3|5|Ref drwg# 00053526:|Y
01|87373|3|6|Net price quoted.|Y
01|87374|5|1|*set of wrenches included with live tool|Y
01|87405|1|1|Tooling Certificate Number: 13687-902-122216|Y
01|87412|1|1|TABLE WITH HAAS MOTORS AND CABLES|Y
01|87418|11|1|$ 1000 LYNDEX NIKKEN TOOL CERT WITH EACH TABLE|Y
01|87430|1|1|Item quoted is non-cancellable and non-returnable|Y
01|87438|1|1|Tooling Certificate Number: 13485-995-062817|Y
01|87443|2|1|EXTERNAL CABLES INCLUDED|Y
01|87443|2|2|DELIVERY MID-MAY STANDARD SHIPPING (BOAT)|Y
01|87443|2|3|IF AIR FREIGHT FROM JAPAN MID APRIL|Y
01|87450|9|1|CONFIRMATION 24DC/100AC|Y
01|87450|13|1|installation includes 4th axis drive fiber optics|Y
01|87450|13|2|internal cablesconnectors travle labor|Y
01|87450|15|1|CONFIRMATION OF APPLICATION TO BE CONFIRMED|Y
01|87450|17|1|CONFIRMATION OF APPLICATION TO BE CONFIRMED|Y
01|87450|20|1|CONFIRMATION OF MACHINE SPINDLE INFORMATION NEEDED|Y
01|87452|1|1|*VDI40|Y
01|87452|3|1|*VDI40|Y
01|87457|1|1|CAT50-C3/4-105UG-DIN|Y
01|87457|1|2|CAT50 Taper 3/4 Milling Chuck w 105mm gage length|Y
01|87457|1|3|hi-speed with DIN|Y
01|87464|1|1|*internal coolant tube threads|Y
01|87467|1|1|Service call completed by Armando Mena on 1/5/18|Y
01|87467|1|2|5AX-201YA s/n: 5532|Y
01|87467|2|1|Transit time: 1.58 hours * $100.00/hr = $158.00|Y
01|87467|2|2|Gas Per Mileage: 58.4mi * $0.565/mi = $32.996|Y
01|87470|3|1|INCLUDES ALL HOSES AND CONNECTORS|Y
01|87470|7|1|INCLUDES SERVO MOTOR INTERNAL WIRE HARNESS BULKHEAD|Y
01|87470|7|2|CONNECTORS FIBRE OPTIC CABLECONNECTORSAMPLIFIER|Y
01|87470|7|3|TRAVEL LODGING AND TRAINING|Y
01|87470|7|4|ALSO INCLUDES INSTALL OF TAILSTOCK AND LEVER SWITCH|Y
01|87490|1|1|**Air or Hydraulic brake|Y
01|87491|4|1|- 5C collet chuck|Y
01|87491|4|2|- Riser tube|Y
01|87491|4|3|- Draw tube|Y
01|87491|4|4|- Draw tube/cylinder adapter|Y
01|87491|4|5|- Pancake hydraulic actuated cylinder|Y
01|87491|5|1|- 3 Port hydraulic manifold|Y
01|87491|5|2|- Additional solenoid|Y
01|87491|6|1|***Optional***|Y
01|87491|6|2|Installation of plumbing|Y
01|87495|3|1|External Power/Feedback Cable (2 Axis)|Y
01|87496|1|1|Customer will build their own custom riser plate.|Y
01|87508|1|1|Factory to install the PS-N63AE pull stud|Y
01|87582|1|1|Modification- cannot be returned|Y
01|87590|4|2|External Power/Feedback Cable for 4th Axis|Y
01|87622|2|1|HSK100A SK10 Major Dream|Y
01|87622|2|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|87622|4|1|HSK100A SK10 Major Dream W/J Nut|Y
01|87622|4|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|87625|2|1|MACHINE DATA SHEETS REQUIRED PRIOR TO INSTALL|Y
01|87625|2|2|INSTALLATION INCLUDES SERVO AMPS(DUAL AXIS) FIBRE|Y
01|87625|2|3|OPTIC CABLES SERVO MOTORS INTERNAL MACHINE CABLES|Y
01|87625|2|4|TRAVELLABOR AND TRAINING|Y
01|87634|1|1|Includes: Table controller pendant external cables|Y
01|87634|1|2|power cable M-code cables and RS232 cable.|Y
01|87643|19|1|NCAT50-HC6-6.00SL|Y
01|87643|20|1|NCAT50-HC8-6.00SL|Y
01|87643|21|1|NCAT50-HC10-6.00SL|Y
01|87643|22|1|NCAT50-HC12-6.00SL|Y
01|87644|1|1|Installed w/ PS-123E at factory|Y
01|87644|2|1|Installed on NC5-46-SK16C-90|Y
01|87644|4|1|Installed w/ PS-123E at factory|Y
01|87644|5|1|Installed on NC5-46-FMA25.4-80S|Y
01|87644|7|1|Installed w/ PS-123E at factory|Y
01|87644|8|1|Installed on NC5-46-FMA25.4C-80S|Y
01|87667|1|1|*** This pricing is exlusive to this project ***|Y
01|87673|5|1|Installation includes: drive unit short bar fiber|Y
01|87673|5|2|optic cables communication cables bulk head cable|Y
01|87673|5|3|set external cable set parameter changes service|Y
01|87673|5|4|time and travel|Y
01|87695|3|1|External Cables|Y
01|87695|4|1|Labor @ Dana Queretaro|Y
01|87731|1|1|H63A-SF6-80B|Y
01|87731|2|1|H63A-SF8-80B|Y
01|87731|3|1|H63A-SF10-85B|Y
01|87731|4|1|H63A-SF12-90B|Y
01|87731|5|1|H63A-SF16-95B|Y
01|87731|6|1|H63A-SF20-100B|Y
01|87731|7|1|H100A-SF6-85B|Y
01|87731|8|1|H100A-SF8-85B|Y
01|87731|9|1|H100A-SF10-90B|Y
01|87731|10|1|H100A-SF12-95B|Y
01|87731|11|1|H100A-SF16-100B|Y
01|87731|12|1|H100A-SF20-105B|Y
01|87757|1|1|C40RAM-ER32-180IC-65TP ER32 Angle Head with Internal|Y
01|87757|1|2|coolant  and taper positioning pin.|Y
01|87757|1|3|Please Note: Delivery is based upon receipt of order|Y
01|87757|1|4|after approval drawings are received from Mide. Please|Y
01|87757|1|5|allow additional time for the approval drawing process.|Y
01|87757|7|1|Net price quoted.|Y
01|87764|1|1|Qty 1-2pcs|Y
01|87764|2|1|Qty 3-9pcs|Y
01|87764|3|1|Qty 10+pcs|Y
01|87764|8|1|Qty 1-2pcs|Y
01|87764|8|2|**DIN - coolant through flange|Y
01|87764|9|1|Qty 3-9pcs|Y
01|87764|9|2|**DIN - coolant through flange|Y
01|87764|10|1|Qty 10+pcs|Y
01|87764|10|2|**DIN - coolant through flange|Y
01|87791|1|1|CNCZ100-3W-120OSP4|Y
01|87791|3|1|Convert CNCZ100-2W-120YA-BR-M > CNCZ100-2W-120OSP4-M|Y
01|87793|3|2|Includes Amplifiers cables fiber optic connectors|Y
01|87793|3|3|and Labor @ EU facilities|Y
01|87794|4|1|includes AMplifier cables fiber optic connector|Y
01|87794|4|2|Labor @ EU facilities|Y
01|87795|4|1|Includes Amplifier cables fiber optic connector|Y
01|87795|4|2|Labor @ EU facilities|Y
01|87797|4|1|Installation and Training - Aprox. 2 days|Y
01|87808|1|1|Includes Haas motors and cables|Y
01|87809|5|1|External cable sets.|Y
01|87851|1|1|External cables included.|Y
01|87851|1|2|For Okuma M560 with OSP-P300MA CONTROLLER|Y
01|87851|1|3|MACHINE/CONTROLLER TO BE CONFIRMED AT TIME OF ORDER|Y
01|87852|2|1|Includes: drive amp bulk head cable set external|Y
01|87852|2|2|cable set fiber optic cable communication cable|Y
01|87852|2|3|travel and labor for installation.|Y
01|87852|2|4|*Optional Axis parameter has to be turn on by|Y
01|87852|2|5|Machine Tool Builder.|Y
01|87854|3|1|SAME AS S/N 1517|Y
01|87854|6|1|Rotary Union P/N TCD-37499 NEW|Y
01|87854|6|3|Spoke with Nikken and previous PTS purchase was New|Y
01|87854|6|4|TAT-401 S/N 1517 but without new Rotary Union.|Y
01|87854|6|5|Original Rotary Union was reconditioned before|Y
01|87859|2|1|1-2pc pricing|Y
01|87859|13|1|Delivery is upon receipt of spindle drawing info|Y
01|87864|1|1|Back-Up screw for BT30-SK16-60 holder.|Y
01|87871|1|1|Stk at factory if ordered by 2/15 we will receive stk|Y
01|87871|1|2|by end of Feb.|Y
01|87871|2|1|Stk at factory if ordered by 2/15|Y
01|87874|3|1|Includes: Bulkhead cables external cables parameter|Y
01|87874|3|2|changes service time and travel.|Y
01|87874|3|3|Lyndex-Nikken will utilze the drvie provided with the|Y
01|87874|3|4|machine.|Y
01|87874|4|1|Trunnion plate with TAT riser.|Y
01|87889|1|1|OKEX-SK10Z-ICE-HS  Okuma BMT60 90 Deg SK10 Output 1:2|Y
01|87889|1|2|Speeder|Y
01|87889|3|1|OKEX-ER20Z-ICE  Okuma BMT60 90 Deg ER20 Output 1:2|Y
01|87889|3|2|Speeder.|Y
01|87894|1|1|BT50-C20-105 w ID Chip hole and Balluff Chip Installed|Y
01|87894|2|1|BT50-C32-135 w ID Chip hole and Balluff Chip Installed|Y
01|87894|3|1|Balluff Chip Part number|Y
01|87899|1|1|135mm Center Height|Y
01|87918|1|1|600MM table with Haas motor and cable set.|Y
01|87918|2|1|600MM Table with Haas motor and cable set.|Y
01|87931|3|1|REPLACEMENT MOTOR TO BE COMPATIBLE WITH OTHER DOOSAN|Y
01|87931|3|2|INSTALLS.|Y
01|87931|5|1|REPLACE AC SOLENOID ON EXISTING TABLES FROM MORI SEIKI|Y
01|87931|7|1|FULL 4TH AXIS INSTALLATION INCLUDING MOTOR AND SOLENOID|Y
01|87931|7|2|CHANGE OUT|Y
01|87931|7|4|ABOVE PRICE IS PER MACHINE|Y
01|87933|2|1|DIN- coolant through the flange|Y
01|87934|1|1|UNV_468  HSK125A-0750A-5.750-ID-GKN With Whistle Notch|Y
01|87934|1|2|ID Chip Hole Only/Drawing C1000|Y
01|87937|1|1|UNV_463 HSK125A-0500A-5.750-ID-GKN With Whistle Notch|Y
01|87937|1|2|ID Chip Hole Only/Drawing C1000|Y
01|87938|1|1|UNV_468  HSK125A-0750A-5.75 -ID-GKN With Whistle Notch|Y
01|87938|1|2|ID Chip Hole Only/Drawing C1000|Y
01|87939|1|1|UNV_463 HSK125A-0500A-5.750-ID-GKN With Whistle Notch|Y
01|87939|1|2|ID Chip Hole Only/Drawing C1000|Y
01|87944|4|1|1pc B/O 12-14 wks ARO|Y
01|87947|2|1|Discount reflects a purchase order of 1~4 Holders|Y
01|87947|3|1|Discount reflects a purchase order of 5~9 Holders|Y
01|87947|4|1|Discount reflects a purchase order of 10+ Holders.|Y
01|87955|4|1|**Wrench fits both holders**|Y
01|87977|1|1|Includes 2 pots of choice|Y
01|88024|3|1|Installation includes: Drive unit short bar fiber|Y
01|88024|3|2|optic cable communications cable bulkhead cables|Y
01|88024|3|3|external cables parameter changes service time and|Y
01|88024|3|4|travel.|Y
01|88027|1|1|PART # PTM-75S-P14|Y
01|88027|1|2|Morse Taper #3 Replacement Quill for MT-105 Tailstock|Y
01|88027|2|1|Extra Shipping Charge to have items Air Freighted|Y
01|88027|2|2|Standard Pricing Above includes Boat Shipment|Y
01|88032|1|1|Howa#: #10 Master Jaws for H018M8 1 set(=3pcs).|Y
01|88034|1|1|Tooling Certificate Number: 13485-995-062817|Y
01|88038|1|1|RGA#TAR-51237|Y
01|88038|1|2|TAT-400 SN#1685|N
01|88038|1|3|Leaking from seal.|Y
01|88043|1|1|3pcs stock remainder ETA 1 week if order is placed|Y
01|88043|1|2|today 2/13/2018|Y
01|88043|5|1|3pcs stock remainder ETA pending|Y
01|88061|1|1|With PS-N63AE|Y
01|88076|1|1|Ref:RGA#TOR-51315|Y
01|88076|1|2|Repair of PF-2|Y
01|88076|1|3|Will not Spin.|Y
01|88076|2|1|Tool needs calibration within .0008 of TIR.|Y
01|88081|1|1|Discount reflects a purchase order of 1~5 holders.|Y
01|88081|2|1|Discount reflects a purchase order of 6~10 holders.|Y
01|88081|3|1|Discount reflects a purchase order of 11~15 holders.|Y
01|88081|4|1|Discount reflects a purchase order of 20+ holders.|Y
01|88081|6|1|Discount reflects a purchase order of 1~5 holders.|Y
01|88081|7|1|Discount reflects a purchase order of 6~10 holders.|Y
01|88081|8|1|Discount reflects a purchase order of 11~15 holders.|Y
01|88081|9|1|Discount reflects a purchase order of 20+ holders.|Y
01|88087|1|1|Installed with PS-123-AIR at factory|Y
01|88087|2|1|Installed on NC5-46-C16-70 at factory|Y
01|88087|4|1|Installed with PS-123-AIR at factory|Y
01|88087|5|1|Installed on NC5-46-SK6C-75 at factory|Y
01|88087|10|1|Installed with PS-123-AIR at factory|Y
01|88087|11|1|Installed on NC5-46-SK6C-90 at factory|Y
01|88088|1|1|Ref:RGA#TOR-51325|Y
01|88088|1|2|Repair of PF-2|Y
01|88088|1|3|Send in for repair.|Y
01|88088|2|1|Needs to calibrate within 0.0008 of TIR.|Y
01|88093|1|1|Ref:RGA#TOR-51324|Y
01|88093|1|2|Tool#1|Y
01|88093|7|1|Tool#5|Y
01|88093|15|1|Tool#6|Y
01|88094|1|1|Price reflects a purchase order of 2~3 pieces.|Y
01|88106|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|88106|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|88106|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|88106|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|88106|8|1|LYNDEX NIKKEN TOOL CERTIFICATE ALIST PRICE. NO CHARGE|Y
01|88107|1|1|COMPLETION 6/5 + SHIPPING AIR 2 WEEKS  BOAT 6 WEEKS|Y
01|88107|1|2|AIR ADDITIONAL COST ( $ 4000.00)|Y
01|88107|4|1|TCD-72197  8P + 1P WITH RJ|Y
01|88108|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|88108|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|88108|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|88108|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|88108|10|1|LYNDEX NIKKEN TOOL CERTIFICATE ALIST PRICE. NO CHARGE|Y
01|88120|1|1|*mold type only avail in 1/8|Y
01|88120|2|1|*Coolant Port version only avail in 1/8|Y
01|88120|19|1|Machine will come with 2x HSK63A pots|Y
01|88126|1|1|BMT55-SK20Z-MS-ICE-60|Y
01|88141|6|1|INSTALLATION INCLUDE DRIVE CABLES BOTH INTERNAL|Y
01|88141|6|2|AND EXTERNAL. CONNECTORSFIBER OPTIC CABLES TRAVEL|Y
01|88141|6|3|AND LABOR. FANUC DATA SHEETS REQUIRED|Y
01|88142|1|1|Ref:RGA#TOR-50862|Y
01|88142|1|2|HP-150 SN#5600293094|Y
01|88142|4|1|Need to calibrate.|Y
01|88142|4|2|Labor is 1hour 30min.|Y
01|88142|7|1|SN#5600256152|Y
01|88142|9|1|Need to calibrate.|Y
01|88142|9|2|Labor is 1 hour 30 min.|Y
01|88142|12|1|SN#5600293096|Y
01|88142|17|1|Need to calibrate.|Y
01|88142|17|2|Labor is 1hour 30min.|Y
01|88142|20|1|SN#5600271130|Y
01|88142|23|1|Need to calibrate.|Y
01|88142|23|2|Labor is 1hour 30min.|Y
01|88142|26|1|SN#5600289942|Y
01|88142|30|1|Need to calibrate.|Y
01|88142|30|2|Labor is 1hour 30min.|Y
01|88142|33|1|SN#5600269103|Y
01|88142|35|1|Need to calibrate.|Y
01|88142|35|2|Labor is 1hour 30min.|Y
01|88144|10|1|Delivery is from receipt of spindle drawing and final|Y
01|88144|10|2|confirmation by customer.|Y
01|88144|10|3|*net pricing|Y
01|88144|17|1|*2+pc pricing|Y
01|88144|17|2|*quoted at NET price|Y
01|88153|1|1|4 riser to increase tilt angle range 0-141 degrees.|Y
01|88153|7|1|4 riser to increase tilt angle to 0-141 degrees.|Y
01|88158|1|1|Ref:RGA#LVR-51316|Y
01|88158|1|2|OKL3-ER32Z SN#A0309|Y
01|88158|2|1|Spindle Collet Nut Bearings and Seals need to replace|Y
01|88158|2|2|Labor is included.|Y
01|88163|2|1|Discount reflects a purchase order of 2 or more.|Y
01|88168|1|1|Ref:RGA#LVR-51375|Y
01|88168|1|2|Repair of MNMP46-ER32X-OFF SN#7363102|Y
01|88168|2|1|Need to replace all bearings seals & o-rings.|Y
01|88168|2|2|Need to replace ER32 spindle.|Y
01|88168|2|3|Labor is included.|Y
01|88169|1|1|Ref:RGA#LVR-51298|Y
01|88169|1|2|Repair of MZQT47-ER16-AD SN#3211902|Y
01|88169|2|1|Need to replace all bearings seals & o-rings.|Y
01|88169|2|3|Labor is included.|Y
01|88172|10|1|Delivery is from receipt of spindle drawing and final|Y
01|88172|10|2|confirmation by customer.|Y
01|88172|10|3|*net pricing|Y
01|88172|17|1|*2+pcs pricing|Y
01|88172|17|2|*Net Pricing|Y
01|88174|1|1|*mold type only avail in 1/8|Y
01|88174|2|1|*Coolant Port version only avail in 1/8|Y
01|88174|19|1|Machine will come with 2x HSK63A pots|Y
01|88175|20|1|QCC-DL65-A6|Y
01|88182|22|1|5/16 - 7/8 Tap Sizes|Y
01|88182|26|1|13/16 - 1-3/8 Tap Sizes|Y
01|88190|5|1|1pc available at this price|Y
01|88190|5|2|After sale this item will be discontinued|Y
01|88191|2|1|Includes: drive amp bulk head cable set external|Y
01|88191|2|2|cable set fiber optic cable communication cable|Y
01|88191|2|3|travel and labor for installation.|Y
01|88191|2|4|*Optional Axis parameter has to be turn on by|Y
01|88191|2|5|Machine Tool Builder.|Y
01|88192|7|1|NEED CONFIRMATION OF MACHINE|Y
01|88198|9|1|MANUAL CLAMPING 5C.|Y
01|88198|10|1|4TH INTERFACE INCLUDES DRIVE CABLES FIBRE OPTICS|Y
01|88198|10|2|TRAVEL AND LABOR|Y
01|88203|4|1|This spanner wrench can be used on the 2 holders above|Y
01|88203|13|1|Please review drawing to confirm the dimensions are|Y
01|88203|13|2|correct|Y
01|88225|1|1|Installed w/PS-N63AE at factory|Y
01|88225|2|1|Installed on NC5-63-TB40-300|Y
01|88237|7|1|REOWA P POWERCHUCK|Y
01|88237|8|1|ADAPTER PLATE FOR EROWA FIXTURE TO NIKKEN TABLE|Y
01|88263|1|1|No Jaws Included.|Y
01|88263|1|2|FlatBack|Y
01|88265|2|1|Installation includes: drive unit short bar fiber|Y
01|88265|2|2|optic cables communication cables bulk head cable|Y
01|88265|2|3|set external cable set parameter changes service|Y
01|88265|2|4|time and travel|Y
01|88279|5|1|coolant port version|Y
01|88289|1|1|CNC180ZA s/n: 20726T|N
01|88330|2|1|External Cable Set|Y
01|88340|8|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|88340|10|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|88340|10|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|88340|10|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|88340|12|1|SUBPLATE WITH 200 MM PITCH SPACING FOR INDIVIDUAL|Y
01|88340|12|2|CNCZ105 TABLES|Y
01|88350|4|1|Delivery is from receipt of spindle drawing and final|Y
01|88350|4|2|confirmation by customer.|Y
01|88350|4|3|*net pricing|Y
01|88351|1|1|Holder quoted with SKN-10BJ coolant nut installed.|Y
01|88351|2|1|Holder quoted with SKN-16BJ coolant nut installed.|Y
01|88351|3|1|Holder quoted with SKN-25BJ coolant nut installed.|Y
01|88351|4|1|Holder quoted with SKN-10BJ coolant nut installed.|Y
01|88351|5|1|Holder quoted with SKN-16BJ coolant nut installed.|Y
01|88351|6|1|Holder quoted with SKN-25BJ coolant nut installed.|Y
01|88352|2|1|Items above are non stock standard items which are not|Y
01|88352|2|2|returnable or cancellable once order is placed|Y
01|88377|2|1|Cables from table to Bulkhead|Y
01|88387|1|1|Includes drive unit interface/external cable fiber|Y
01|88387|1|2|optic cable short bar travel labor for CNC Table|Y
01|88387|1|3|Also includes all items to interface TAT-250 brake|Y
01|88387|1|4|system for air actuation (solenoid/wire harness/lines)|Y
01|88395|4|1|H63RAM-MI50-187-65TP (105504 w/tapered pinno coolant)|Y
01|88395|4|2|Delv 2pcs 4 wks3rd pc ETA 6-7 weeks from ARO|Y
01|88395|6|1|HSK63A Adjustable MI50 RAH|Y
01|88397|1|1|HSK63A-FMH25.4-70-150|Y
01|88397|1|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|88397|1|3|Price is for 1-3 pcs|Y
01|88398|1|1|C40 Flex Head RAH for ER20/ER25 range in list price|Y
01|88398|1|2|from approx $12300-$13000 per variables chosen|Y
01|88400|1|1|net price per unit|Y
01|88400|1|2|special order no cancelable no refundable|Y
01|88400|2|1|net price per unit|Y
01|88400|2|2|special order no cancelable no refundable|Y
01|88400|8|1|net price per unit|Y
01|88400|8|2|special order no cancelable no refundable|Y
01|88400|9|1|net price per unit|Y
01|88400|9|2|special order no cancelable no refundable|Y
01|88400|12|1|net price per unit|Y
01|88400|13|1|net price per unit|Y
01|88402|2|1|Cable set not including APC swing box (design TBD)|Y
01|88402|3|1|***Optional installation***|Y
01|88417|1|1|6pc stkBO due 3/21|Y
01|88421|3|1|REPLACEMENT MOTOR TO BE COMPATIBLE WITH OTHER DOOSAN|Y
01|88421|3|2|INSTALLS.|Y
01|88421|7|1|REPLACE AC SOLENOID ON EXISTING TABLES FROM MORI SEIKI|Y
01|88421|8|1|POWER FEEDBACK CABLE SET|Y
01|88421|9|1|FULL 4TH AXIS INSTALLATION INCLUDING MOTOR AND SOLENOID|Y
01|88421|9|2|CHANGE OUT|Y
01|88421|9|3|ABOVE PRICE IS PER MACHINE|Y
01|88421|9|4|ADDITIONAL LABOR NEEDED FOR CONVERTING CNC 260MAM|Y
01|88421|9|5|TO CNC-260FA-M GEAR CHANGE INTERNAL HARNESS CHANGE|Y
01|88421|9|6|MOTOR CHANGE. MORE LABOR THAN TABLES FROM MORI TO DOOSA|Y
01|88431|9|1|*once 24pcs depleted these will need to be specially|Y
01|88431|9|2|quoted.|Y
01|88431|10|1|*once 33pcs depleted these will need to be specially|Y
01|88431|10|2|quoted.|Y
01|88441|1|1|Includes Instakllation @ RSB Silao|Y
01|88441|3|1|Accesories for hydraulic line|Y
01|88444|1|1|One full day of training on preventative maintenance|Y
01|88444|1|2|and troubleshooting for Nikken rotary tables|Y
01|88445|1|1|*quoted at net price|Y
01|88445|4|1|*quoted at net price|Y
01|88446|1|1|*old style slight cosmetic differences|Y
01|88446|1|2|*brand new condition|Y
01|88446|1|3|*special disc for old style only|Y
01|88446|3|1|*Pricing for 1-7pcs|Y
01|88446|4|1|*Pricing for 8+pcs|Y
01|88451|1|1|***price/delvery pending***|Y
01|88451|3|1|*once 24pcs depleted these will need to be specially|Y
01|88451|3|2|quoted.|Y
01|88451|4|1|*once 33pcs depleted these will need to be specially|Y
01|88451|4|2|quoted.|Y
01|88459|1|1|Discount reflects a purchase order of 1~3 holders.|Y
01|88459|2|1|Discount reflects a purchase order of 4+ holders.|Y
01|88460|1|1|*5pc min|Y
01|88468|3|1|This table must be clamped hydraulically|Y
01|88468|8|1|Installation and Training - Aprox. 2 days|Y
01|88472|2|1|Includes Electronic and labor @ AAMEC Qro.|Y
01|88478|1|1|Includes Fanuc drive unit interface cables external|Y
01|88478|1|2|cables fiber optic cables short bar travel labor|Y
01|88478|1|3|expenses|Y
01|88488|3|1|C4006-0500A-3.00B|Y
01|88488|3|2|CAT40 1/2 Aerospace End Mill Holder 3gl Balanceable|Y
01|88495|1|1|Model# 95.01.036.003|Y
01|88495|1|2|Special Order. Unit Price Each.|Y
01|88495|2|1|Model# HSK100A-TSB-CAT40U-120|Y
01|88495|2|2|Special Order. Unit Price Each.|Y
01|88499|5|1|OKEX-ER32X-OFF|Y
01|88499|5|2|1 PC Pricing Quoted as NET pricing Non-returnable|Y
01|88499|5|3|Non-cancelable|Y
01|88499|6|1|OKEX-ER32X-OFF|Y
01|88499|6|2|2 PC Pricing Quoted as NET pricing Non-returnable|Y
01|88499|6|3|Non-cancelable|Y
01|88513|8|1|EXTERNAL CABLE SET FOR ADDITIONAL AXIS|Y
01|88513|10|1|4th AXIS INSTALLATION INCLUDES INTERNAL CABLESBULKHEAD|Y
01|88513|10|2|CONNECTORS FIBRE OPTIC CABLES ADDITIONAL DRIVES|Y
01|88513|10|3|SERVO MOTOR AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|88513|12|1|SUBPLATE WITH 200 MM PITCH SPACING FOR INDIVIDUAL|Y
01|88513|12|2|CNCZ105 TABLES|Y
01|88530|1|1|Tooling Certificate Number:  5410-1129-021918|Y
01|88543|1|1|HFO TO SUPPLY MOTORS AND CABLES|Y
01|88543|6|1|HFO TO SUPPLY MOTORS AND CABLES|Y
01|88558|1|1|*non-coolant|Y
01|88558|3|1|**Coolant thru|Y
01|88562|1|1|*old-style w/ 52mm bore depth|Y
01|88562|4|1|Qty from 1-7pcs|Y
01|88562|5|1|Qty from 8pcs|Y
01|88570|1|1|ref. OK112-30000|Y
01|88570|2|1|ref. OK112-31000|Y
01|88612|1|1|Ref:RGA#TOR-51426|Y
01|88612|1|2|PF-2|Y
01|88612|1|3|Issue with stylus.|Y
01|88612|7|1|SPZ-1(PF-2)|Y
01|88612|7|2|Issue with stylus.|Y
01|88620|3|1|*Balanceable version. 5pc left in stock|Y
01|88620|3|2|These will be discontinued once they are gone.|Y
01|88623|1|1|Installed w/ PS-130E pull stud|Y
01|88623|2|1|Installed on BT30-TB40-150|Y
01|88630|4|1|External Power/Feedback Cable for 4th Axis|Y
01|88630|5|1|Workholding Not Included In Quote|Y
01|88630|5|2|Machine Compatability Must Be Checked Prior to Order|Y
01|88632|18|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|88632|18|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|88632|18|3|THIS COST DOES NOT INCLUDE ANY PARAMETERS THAT FANUC|Y
01|88632|18|4|MAY NEED TO INSTALL. THIS CANNOT BE DETERMINED TILL|Y
01|88632|18|5|WE RECEIVE MACHINE DATA SHEETS ARE RECEIVED|Y
01|88632|18|6|THERE IS A POSSIBILITY THAT OUR TECH WILL BE ABLE TO|Y
01|88632|18|7|TURN ON.|Y
01|88632|20|1|NO CHARGE TOOL CERTIFICATE OFFERED WITH NEW MACHINE|Y
01|88632|20|2|PURCHASE WITH ROTARY TABLE|Y
01|88636|1|1|BT40-NC5-53-30 >>Includes VMCL-53 wrench. Thread style|Y
01|88636|1|2|so no special pull stud is required.|Y
01|88636|3|1|NC5TS-53-VMC12-140 Attachment Dream Cut|Y
01|88636|5|1|PMK12-4 Collet|Y
01|88644|1|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|88645|1|1|BT50-HC12-4.33 BT HYDRAULIC CHUCK 12mm SHORT|Y
01|88645|2|1|BT50-HC12-6.30 HYDRAULIC CHUCK 12mm LONG|Y
01|88645|3|1|BT50-HC20-4.33 BT50 HYDRAULICK CHUCK 20mm SHORT|Y
01|88645|4|1|BT50-HC20-6.30 BT50 HYDRAULIC HOLDER 20mm LONG|Y
01|88645|5|1|BT50--HC25-4.33 BT50 HYDRAULIC CHUCK 25mm SHORT|Y
01|88645|6|1|BT50-HC25-6.30 BT50 HYDRAULIC CHUCK 25mm LONG|Y
01|88645|7|1|BT40-HC0500-3.55 BT40 HYDRAULIC CHUCK 1/2 SHORT|Y
01|88645|8|1|BT40-HC0750-3.55 BT40 HYDRAULIC CHUCK 3/4 SHORT|Y
01|88645|9|1|BT40-HC1000-3.55 BT40 HYDRAULIC CHUCK 1in SHORT|Y
01|88645|10|1|BT50-HC0500-4.33 BT50 HYDRAULIC CHUCK 1/2 SHORT|Y
01|88645|11|1|BT50-HC0750-4.33 BT50 HYDRAULIC CHUCK SHORT|Y
01|88645|12|1|BT50-HC1000-4.33 BT40 HYDRAULIC CHUCK 1in SHORT|Y
01|88645|13|1|B50SF-0125-3.94 BT50 SF HOLDER 1/8|Y
01|88650|1|1|Ref:RGA#TAR-51302|Y
01|88650|1|2|Send in for repair.|Y
01|88650|43|1|***SPECIAL REDUCTION***|Y
01|88650|43|2|***Please see Josh B***|Y
01|88663|1|1|Reference RGA# TAR-51336|Y
01|88663|1|2|CNCZ180LSA3 s/n: 12271|N
01|88665|3|1|Includes drive unit interface cable external cable|Y
01|88665|3|2|fiber optic cable short bar labor and travel|Y
01|88689|2|1|Installation includes: drive unit short bar fiber|Y
01|88689|2|2|optic cables communication cables bulk head cable|Y
01|88689|2|3|set external cable set parameter changes service|Y
01|88689|2|4|time and travel|Y
01|88692|1|1|Please Note: Discount reflects a purchase order of 10|Y
01|88692|1|2|or more holders.|Y
01|88695|3|1|Drive unit bulkhead cable set B-master cable|Y
01|88712|1|1|Tooling Certificate Number: 25000-1086-121817RT|Y
01|88716|1|1|Includes Two(2) Tools Pots choice of Taper|Y
01|88766|4|1|Collets in 1/32 increments|Y
01|88777|1|1|Price reflects a purchase order of 1~4 holders.|Y
01|88777|3|1|Price reflects a purchase order of 5~9 holders.|Y
01|88777|5|1|Price reflects a purchase order of 10+ holders.|Y
01|88783|46|1|Coolant cap must be modified by user to 24mm hole|Y
01|88789|1|1|HFO TO SUPPLY 2 SERVO MOTORS AND CABLES|Y
01|88789|3|1|HFO TO SUPPLY 2 SERVO MOTORS AND CABLES|Y
01|88799|3|1|Delivery time might change.|Y
01|88803|1|1|9HP-LS|Y
01|88806|3|1|2pcs 3-4 Weeks|Y
01|88806|4|1|1pc 3-4 weeks|Y
01|88806|8|1|2pcs 3-4 weeks|Y
01|88814|1|1|*Supplied w/ 2x Chuck Pots (CAT40) at n/c|Y
01|88814|1|2|*Includes choice of 10 Free (std-gl) holders|Y
01|88824|1|1|*Qty 1-5pcs|Y
01|88824|2|1|*Qty 6+pcs|Y
01|88824|4|1|*Qty 1-5pcs|Y
01|88824|5|1|*Qty 6+pcs|Y
01|88828|1|1|Howa Part #H01MA10)|Y
01|88832|1|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|88832|1|2|External Cables Service Time and Travel.|Y
01|88858|2|1|HSK100A-MDSK16-125P-J-IDU|Y
01|88865|4|1|External Power/Feedback Cable for 4th Axis|Y
01|88865|5|1|Workholding Not Included In Quote|Y
01|88865|5|2|Machine Compatability Must Be Checked Prior to Order|Y
01|88872|1|1|Ref:RGA#LVR-51378|Y
01|88872|1|2|MNL12-ER40Z-C-7MP SN#A0023|Y
01|88872|1|3|Tool is running hot & bearings are bad.|Y
01|88872|2|1|Bearings Seals Collet Nut Coolant Seals and|Y
01|88872|2|2|other parts need to replace.|Y
01|88872|2|3|Also need to replace gears & spindle.|Y
01|88872|2|4|Labor is included.|Y
01|88881|5|1|*individually sold at 1pc each|Y
01|88888|1|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|88899|2|1|Installation includes: drive unit short bar fiber|Y
01|88899|2|2|optic cables communication cables bulk head cable|Y
01|88899|2|3|set external cable set parameter changes service|Y
01|88899|2|4|time and travel|Y
01|88938|1|1|MD# 0622540|Y
01|88938|2|1|MD# 0272540|Y
01|88938|3|1|MD# 1730132 However we do not offer the blade kit and|Y
01|88938|3|2|inserts.|Y
01|88938|4|1|MD# 0833810 Quoting just the BB holder. We do not offer|Y
01|88938|4|2|the plug and seal kit.|Y
01|88942|1|1|UNV#1655 NMTB50-1.1/4 Stub Mill X 6.00 gage per print|Y
01|88942|1|2|Chip Hole Only. GKN has key for this holder so not|Y
01|88942|1|3|required per MaryEllen. Arbor screw dimensions 3/4-16|Y
01|88946|1|1|200MM High Speed table with installation kit for R450|Y
01|88946|1|2|one table only.|Y
01|88952|12|1|ETA - 1 WEEK UPON RECEIPT OF ORDER|Y
01|88956|3|1|Quoted as NET pricing|Y
01|88956|3|2|Requires spindle nose drawing and picture of spindle|Y
01|88965|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|88965|2|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|88965|3|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|88965|4|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|88973|1|1|Ref:RGA#TAR-51308|Y
01|88973|1|2|5AX-130ZA SN#2016|N
01|88973|1|3|Send in for evaluation.|Y
01|88976|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|88976|2|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|88976|3|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|88988|1|1|Installed with PS-123-AIR at factory|Y
01|88988|2|1|Installed on NC5-46-C16-70 at factory|Y
01|88988|4|1|Installed with PS-123-AIR at factory|Y
01|88988|5|1|Installed on NC5-46-SK6C-75 at factory|Y
01|88988|9|1|Installed with PS-123-AIR at factory|Y
01|88988|10|1|Installed on NC5-46-SK6C-90 at factory|Y
01|88995|1|1|Prepared with Sigma 5 motors & cables|Y
01|89000|2|1|*New part# CAT40-SK20-90U-IDU|Y
01|89002|3|1|P/N ST-CN101R063   TAPER POT|Y
01|89004|2|1|The above holders CAT40-SK20-90U are to be DIN Modified|Y
01|89029|1|1|Reference RGA# TAR-51322|Y
01|89029|1|2|CNC200BOSP s/n: 3874|N
01|89042|7|1|1pc stock remainder ETA aprox 4/2/2018|Y
01|89042|8|1|10pcs stock 5pcs eta aprox 1-2weeks 1pc ETA aprox|Y
01|89042|8|2|3/28/2018|Y
01|89042|13|1|2nd option for 2 End Mill Holder.|Y
01|89083|3|1|Refurbished Unit|Y
01|89085|1|1|Expires 3 months after date issued|Y
01|89087|1|1|Includes CNCZ105LSAIII Rotary Table Junction Box|Y
01|89087|1|2|Sheet Metal External/Interface Cables Amplifier and|Y
01|89087|1|3|B-Axis Cable|Y
01|89087|4|1|Includes 5AX-100SA3 Table Junction Box Sheet Metal|Y
01|89087|4|2|External/Interface Cables Amplifier and B-Axis Cable|Y
01|89093|1|1|CAT50; 90deg AGH;Torque arm center distance A=110mm;|Y
01|89093|1|2|d=28mm tooling interface pilot arbor 3 inches dia;|Y
01|89093|1|3|2x1/2 key saw blade interface;|Y
01|89093|1|4|no coolant supply; input is reversal to output;|Y
01|89093|1|5|L=215mm; L1=105mm;1:1 Gear ratio; max torque M=150Nm;|Y
01|89093|1|6|5000RPM;approx 19kg ref drawg# 00053696|Y
01|89093|1|7|Quoted as Net pricing Non-cancelableNon-returnable|Y
01|89093|2|1|CAT50; 90deg AGH;Torque arm center distance A=110mm;|Y
01|89093|2|2|d=28mm tooling interface pilot arbor 3 inches dia;|Y
01|89093|2|3|2x1/2 key saw blade interface;(For 3 saw blades 8inche|Y
01|89093|2|4|dia)no coolant supply; input is reversal to output;|Y
01|89093|2|5|L=215mm; L1=210mm;2.5:1 Gear ratio; max torque M=250Nm;|Y
01|89093|2|6|n1=4500 RPM / n2 = 1800RPM approx 19kg|Y
01|89093|2|7|ref drawg# 00047302|Y
01|89093|2|8|Drawing from the tool interface from the machining|Y
01|89093|2|9|need to be provided|Y
01|89093|2|10|Quoted as Net pricing Non-cancelableNon-returnable|Y
01|89112|1|1|One time courtesy|Y
01|89112|2|1|One time courtesy|Y
01|89118|1|1|NK105-99063  Nakamura NK105-33000 but 76mm Centerline|Y
01|89118|1|2|and Capto C4 Output|Y
01|89118|1|3|Nakamura WT300 Lower Turret|Y
01|89118|3|1|NK105-99064  Nakamura NK105-33000 but 97mm Centerline|Y
01|89118|3|2|and Capto C4 Output|Y
01|89118|3|3|Nakamura WT300 Lower Turret|Y
01|89123|1|1|AC6-ECH20F-150 ER32 Holder 6.0 Gage|Y
01|89123|2|1|AC6-ECH20F-90 ER32 Holder 4.0 Gage Length|Y
01|89123|3|1|AC6-ECH10F-150 ER16 Holder 6.0 Gage Length|Y
01|89123|4|1|AC6-ECH10F-90 ER16 Holder 4.0 Gage Length|Y
01|89124|1|1|Ref:RGA#CUR-51474|Y
01|89124|1|2|CAT40U-NX5-153 SN#AJ-146|Y
01|89124|1|3|Tool is seized.|Y
01|89159|8|1|Junction Box|Y
01|89198|1|1|9NC5-46-CNSP|Y
01|89198|15|1|9NC5-63-CNSP|Y
01|89198|29|1|9NC5-100-CNSP|Y
01|89206|1|1|Table + cables only no motor|Y
01|89223|1|1|Tooling Certificate #3690-1126-021518|Y
01|89229|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|89233|1|1|For 1 week lead we need order by 3PM today3/6/2018|Y
01|89239|1|1|Capto C6: AGH 90deg ER25 - Special|Y
01|89239|2|1|Capto C6: AGH 90deg ER25 - Special|Y
01|89239|3|1|Capto C6: AGH 90deg ER25 - Special|Y
01|89239|4|1|Capto C6: AGH 90deg ER25 - Special|Y
01|89253|1|1|Ref:RGA#TAR-51366|Y
01|89253|1|2|Table keeps losing home and sways to one side.|Y
01|89270|1|1|CNC302OSP4-M ROtary Table|Y
01|89278|1|1|Unit price each.|Y
01|89279|1|1|Quoted at Net price.|Y
01|89284|4|1|H100A-SF0375-5.12 3/8Shrink Fit Holder|Y
01|89284|4|2|Price reflects order of 5~9 tools.|Y
01|89284|5|1|H100A-SF0375-5.12 3/8Shrink Fit Holder|Y
01|89284|5|2|Price reflects order of 10+ tools.|Y
01|89306|1|1|BT50-C20-105-IDI with ID Chip hole and Chip Installed|Y
01|89306|1|2|Balluff Chip P/N: BIS-C-122-04/L installed|Y
01|89306|2|1|BT50-C32-135-IDI with ID Chip hole and Chip Installed|Y
01|89306|2|2|Balluff Chip P/N: BIS-C-122-04/L Installed|Y
01|89308|2|1|*5pc min|Y
01|89308|3|1|*5pc min|Y
01|89308|6|1|*5pc min|Y
01|89308|9|1|*10pc set|Y
01|89308|10|1|*5pc min|Y
01|89308|11|1|*5pc min|Y
01|89308|15|1|*5pc min|Y
01|89308|16|1|*5pc min|Y
01|89308|17|1|*5pc min|Y
01|89308|18|1|*5pc min'|Y
01|89308|32|1|*5pc min|Y
01|89308|33|1|*5pc min|Y
01|89334|1|1|Note: Required delivery is 1st quarter of 2018.|Y
01|89334|2|1|Required delivery is 2nd quarter of 2018.|Y
01|89337|5|1|I will send pricing shortly.|Y
01|89339|3|1|External Power/Feedback Cables (2 Axis)|Y
01|89339|4|1|Machine Compatability Must Be Checked Prior to Order|Y
01|89339|4|2|Ladder Modifications May Be Required|Y
01|89339|4|3|Workholding Not Included in Quote|Y
01|89339|6|1|$2000 Tooling Certificate - Included at No Cost|Y
01|89343|3|1|Assistance connecting and on-site training|Y
01|89345|1|1|Please make sure the tap collet has a .168 shank & .131|Y
01|89345|1|2|drive square.|Y
01|89349|1|1|5AX-130 s/n: 4999|N
01|89349|1|2|Reference RGA# TAR-51479|Y
01|89349|6|1|Expedite fee quoted to have table completed within 5|Y
01|89349|6|2|business days of receipt.  Table will be completed|Y
01|89349|6|3|and ready to ship out by 3/9/18.|Y
01|89351|13|1|This item is non-standard and considered special.|Y
01|89351|13|2|Price quoted is NET pricing.|Y
01|89358|1|1|HSK100A-SM0750-5.50GKN 1/2 Shell Mill Holder with|Y
01|89358|1|2|Chip Hole Only. GKN-UNV#416|Y
01|89366|1|1|Ref:RGA#TAR-51394|Y
01|89366|1|2|Send in for evaluation.|Y
01|89392|28|1|HA33NC-TS|Y
01|89392|28|2|Repair AC motor side - Encoder is good|Y
01|89420|1|1|Conversion to Okuma|Y
01|89420|1|2|Parts/Labor|Y
01|89445|2|1|Etch C5005-0562-5.02 with Tool# TAM211006|Y
01|89459|1|1|*Supplied w/ 2x Chuck Pots (CAT40) at n/c|Y
01|89459|1|2|*Includes choice of 10 Free (std-gl) holders|Y
01|89459|3|1|*Supplied w/ 3x Chuck Pots (CAT40) at n/c|Y
01|89459|3|2|*Includes choice of 10 Free (std-gl) holders|Y
01|89461|1|1|ref. H037M6|Y
01|89475|1|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|1|2|at factory.  Pull stud is at additional charge.|Y
01|89475|1|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|1|4|in order to proceed.|Y
01|89475|2|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|2|2|at factory.  Pull stud is at additional charge.|Y
01|89475|2|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|2|4|in order to proceed.|Y
01|89475|3|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|3|2|at factory.  Pull stud is at additional charge.|Y
01|89475|3|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|3|4|in order to proceed.|Y
01|89475|4|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|4|2|at factory.  Pull stud is at additional charge.|Y
01|89475|4|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|4|4|in order to proceed.|Y
01|89475|5|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|5|2|at factory.  Pull stud is at additional charge.|Y
01|89475|5|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|5|4|in order to proceed.|Y
01|89475|6|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|6|2|at factory.  Pull stud is at additional charge.|Y
01|89475|6|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|6|4|in order to proceed.'|Y
01|89475|7|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|7|2|at factory.  Pull stud is at additional charge.|Y
01|89475|7|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|7|4|in order to proceed.|Y
01|89475|8|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|8|2|at factory.  Pull stud is at additional charge.|Y
01|89475|8|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|8|4|in order to proceed.|Y
01|89475|9|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|9|2|at factory.  Pull stud is at additional charge.|Y
01|89475|9|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|9|4|in order to proceed.|Y
01|89475|10|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|10|2|at factory.  Pull stud is at additional charge.|Y
01|89475|10|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|10|4|in order to proceed.|Y
01|89475|11|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|11|2|at factory.  Pull stud is at additional charge.|Y
01|89475|11|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|11|4|in order to proceed.|Y
01|89475|12|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|12|2|at factory.  Pull stud is at additional charge.|Y
01|89475|12|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|12|4|in order to proceed.|Y
01|89475|13|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|13|2|at factory.  Pull stud is at additional charge.|Y
01|89475|13|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|13|4|in order to proceed.|Y
01|89475|14|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|14|2|at factory.  Pull stud is at additional charge.|Y
01|89475|14|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|14|4|in order to proceed.|Y
01|89475|15|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|15|2|at factory.  Pull stud is at additional charge.|Y
01|89475|15|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|15|4|in order to proceed.|Y
01|89475|16|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|16|2|at factory.  Pull stud is at additional charge.|Y
01|89475|16|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|16|4|in order to proceed.|Y
01|89475|17|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|17|2|at factory.  Pull stud is at additional charge.|Y
01|89475|17|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|17|4|in order to proceed.|Y
01|89475|18|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|18|2|at factory.  Pull stud is at additional charge.|Y
01|89475|18|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|18|4|in order to proceed.|Y
01|89475|19|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|19|2|at factory.  Pull stud is at additional charge.|Y
01|89475|19|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|19|4|in order to proceed.|Y
01|89475|20|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|20|2|at factory.  Pull stud is at additional charge.|Y
01|89475|20|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|20|4|in order to proceed.|Y
01|89475|21|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|21|2|at factory.  Pull stud is at additional charge.|Y
01|89475|21|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|21|4|in order to proceed.|Y
01|89475|22|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|22|2|at factory.  Pull stud is at additional charge.|Y
01|89475|22|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|22|4|in order to proceed.|Y
01|89475|23|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|23|2|at factory.  Pull stud is at additional charge.|Y
01|89475|23|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|23|4|in order to proceed.'|Y
01|89475|24|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|89475|24|2|at factory.  Pull stud is at additional charge.|Y
01|89475|24|3|The Pull Stud part# must be determined at time of PO|Y
01|89475|24|4|in order to proceed.|Y
01|89478|1|1|X Axis MI50 Live tool Muritech MT200|Y
01|89478|2|1|Z Axis MI50 Live tool for Muritech MT200|Y
01|89480|1|1|X Axis MI50 Live tool for Nakamura NT3|Y
01|89480|2|1|Z Axis MI50 Live tool for Nakamura NT3|Y
01|89489|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|89515|1|1|External Coolant|Y
01|89515|2|1|Internal and External Coolant|Y
01|89515|3|1|70mm Centerline External Coolant|Y
01|89515|4|1|85mm Centerline External Coolant|Y
01|89515|5|1|85mm Centerline Internal and External Coolant|Y
01|89515|6|1|Main & Sub Spindles External Coolant|Y
01|89515|7|1|Internal & External Coolant|Y
01|89515|8|1|85mm Centerline Internal and External Coolant|Y
01|89515|9|1|Internal & External Coolant|Y
01|89515|10|1|Main & Sub Spindle with Internal & External Coolant|Y
01|89535|1|1|Ref:RGA#LVR-51402|Y
01|89535|1|2|MNL12-ER11(X)-SUB-SP SN#81998 01|Y
01|89535|1|3|Tool holder was removed for failure. Endmill Breakage|Y
01|89535|1|4|multiple times back to back.|Y
01|89535|2|1|Replace all bearings seals and o-rings.|Y
01|89535|2|2|Resurface spindles as needed.|Y
01|89535|2|3|Labor is included.|Y
01|89535|4|1|MNL12-ER11(X)-SUB-SP SN#87119 02|Y
01|89535|4|2|Tool holder was removed for scheduled maintenance.|Y
01|89535|5|1|Replace all bearings seals and o-rings.|Y
01|89535|5|2|Resurface spindles as needed.|Y
01|89535|5|3|Labor is included.|Y
01|89535|7|1|MNL12-ER11(X)-SUB-SP SN#61931 04|Y
01|89535|7|2|Tool holder was removed for scheduled maintenance.|Y
01|89535|8|1|Replace all bearings seals and o-rings.|Y
01|89535|8|2|Resurface spindles as needed.|Y
01|89535|8|3|Labor is included.|Y
01|89549|1|1|Ref:RGA#LVR-51334|Y
01|89549|1|2|MNL12-ER32Z-MS SN#A1458|Y
01|89549|2|1|Bearings seals drive collet nut and gears needs to|Y
01|89549|2|2|replace.|Y
01|89549|2|3|The clutch is broken so bad and need to replace.|Y
01|89549|2|4|Labor is included.|Y
01|89549|2|5|One time courtesy 20% discount|Y
01|89549|4|1|Replacement: core trade in 45% discount $2209.35|Y
01|89549|4|2|(list price $4017)|Y
01|89551|5|1|#6  (.216-.177)|Y
01|89551|6|1|#11 (.216-.177)|Y
01|89551|8|1|#3 (.216-.177)|Y
01|89561|1|1|Contains: (2) Keys & (2) Bolts|Y
01|89561|1|2|2 - 5/16 keys and screws|Y
01|89565|1|1|Quoted as NET pricingNon-cancelableNon-returnable|Y
01|89567|1|1|Quoted as NET pricingnon-cancelablenon-returnable|Y
01|89570|1|1|BT50 20mm Milling Chuck w ID Chip Hole|Y
01|89570|3|1|BT50 32mm Milling Chuck with ID Chip Hole|Y
01|89577|1|1|4TH AND 5TH AXIS INSTALLATION NEEDED|Y
01|89582|1|1|Net price reflects installation of SKN-16BJ(GH) coolant|Y
01|89582|1|2|nut.|Y
01|89582|2|1|Net price reflects installation of SKN-10BJ(GH) coolant|Y
01|89582|2|2|nut.|Y
01|89585|1|1|Special Mori Tool for NLX 12 Station|Y
01|89585|1|2|Saw Blade Tool for machine no Y-Axis|Y
01|89585|1|3|Output PG-25 or ER Interface|Y
01|89585|1|4|External Coolant Max 3000 RPM|Y
01|89585|3|1|Special Mori Tool for NLX 12 Station|Y
01|89585|3|2|Saw Blade Tool for machine no Y-Axis|Y
01|89585|3|3|Output PG-25 or ER Interface|Y
01|89585|3|4|External Coolant Max 3000 RPM|Y
01|89588|1|1|Special Mori Tool for NLX 12 Station|Y
01|89588|1|2|Saw Blade Tool for machine no Y-Axis|Y
01|89588|1|3|Output PG-25 or ER Interface|Y
01|89588|1|4|External Coolant Max 3000 RPM|Y
01|89588|3|1|Special Mori Tool for NLX 12 Station|Y
01|89588|3|2|Saw Blade Tool for machine no Y-Axis|Y
01|89588|3|3|Output PG-25 or ER Interface|Y
01|89588|3|4|External Coolant Max 3000 RPM|Y
01|89592|3|1|QTY Break!|Y
01|89623|1|1|Ref:RGA#LVR-51452|Y
01|89623|1|2|MNL12-ER25Z-MSD S/#A0008|Y
01|89623|1|3|MNL12-ER25Z-MSD S/#A0032|Y
01|89623|1|4|MNL12-ER25Z-MSD S/#A0034|Y
01|89623|1|5|Bearings Seals O-Rings need to replace.|Y
01|89623|1|6|4 spindle shafts needs to replace.|Y
01|89623|1|7|Labor is included.|Y
01|89623|4|1|MNL12-ER32Z-MS SN#A2166|Y
01|89623|4|2|Bearings Seals O-Rings Collet Nuts need to replace.|Y
01|89623|4|3|Labor is included.|Y
01|89623|5|1|Bearings Seals O-Rings Collet Nuts need to replace.|Y
01|89623|5|2|Labor is included.|Y
01|89629|1|1|Ref:RGA#LVR-51451|Y
01|89629|1|2|OKL3-ER32X-ICE SN#35680 01|Y
01|89629|1|3|Tool is seized up.|Y
01|89629|2|1|Replace all bearings seals and o-rings.|Y
01|89629|2|2|Labor is included.|Y
01|89630|5|1|C4017-0032B has a 5.00 gage length.|Y
01|89630|5|2|Close out promo!!!|Y
01|89639|1|1|Ref:RGA#TOR-51423|Y
01|89639|1|2|HSK100A-C20EX-115 is unrepairable.|Y
01|89640|7|1|H80F-SF0312-3.00B|Y
01|89640|9|1|HSK80F-ER20-75P|Y
01|89640|10|1|HSK80F-ER32-80|Y
01|89640|12|1|HSK80F-ER20-75P|Y
01|89640|13|1|HSK80F-ER32-80|Y
01|89642|1|1|1600MM table with Alpha 30/3000i motor.|Y
01|89642|1|2|Angle plate provided by Dril-Quip for vertical use.|Y
01|89642|1|3|500PSI hydraulic source with solenoid and pressure|Y
01|89642|1|4|switches to be provide by Dril-Quip.|Y
01|89642|1|5|Integration and installation is the responiblity of|Y
01|89642|1|6|Dril-Quip.|Y
01|89642|3|1|Power/Signal and Feedback cables to yet to be|Y
01|89642|3|2|determined lenght.|Y
01|89642|3|3|Wiring diagram to be provided by Dril-Quip|Y
01|89643|1|1|Angle plate provided by Hillary for vertical use|Y
01|89643|1|2|500PSI hydraulic source with solenoid and pressure|Y
01|89643|1|3|switches to be provided by HIllary|Y
01|89643|1|4|Integration and installation of hydraulic source and|Y
01|89643|1|5|angle plate is the responsibility of Hillary|Y
01|89643|2|1|Includes Fanuc drive unit external/internal cabling|Y
01|89643|2|2|short bar fiber optic cable labor expenses|Y
01|89649|9|1|MANUAL CLAMPING 5C.|Y
01|89649|10|1|4TH INTERFACE INCLUDES DRIVE CABLES FIBRE OPTICS|Y
01|89649|10|2|TRAVEL AND LABOR|Y
01|89650|1|1|Includes D21 Chuck Hydraulic Pancake Cylinder Draw|Y
01|89650|1|2|bar and nose piece.|Y
01|89652|1|1|Block with holes; solid piece; screws 2long 1 short.|Y
01|89653|1|1|Block with holessolid block3 screws 1 short 2 long|Y
01|89670|1|1|Capto C6: AGH 90deg ER25 - Special|Y
01|89670|2|1|Capto C6: AGH 90deg ER25 - Special|Y
01|89670|3|1|Capto C6: AGH 90deg ER25 - Special|Y
01|89670|4|1|Capto C6: AGH 90deg ER25 - Special|Y
01|89683|1|1|Ref:RGA#TAR-51456|Y
01|89683|1|2|Too much backlash axis position not repeating.|Y
01|89687|2|1|Option 1|Y
01|89700|2|1|Net price quoted.|Y
01|89706|1|1|ref. 190231|Y
01|89706|2|1|OKE4-ER32X-OFF-ICE|Y
01|89706|3|1|ref. 190233|Y
01|89711|1|1|SPECIAL PRICING. DEMO TABLE A THINC BUILDING ON MV560|Y
01|89712|4|1|P/N CNCZ100-3W-120SA-BR2/S100|Y
01|89719|1|1|Unit Price Each.|Y
01|89719|6|1|9C1.1/4SL-FS-EX-J|Y
01|89719|6|2|Face cap (Vgrooves) End mill w/o oil hole|Y
01|89719|8|1|Unit Price Each.|Y
01|89719|12|1|9C1SL-FS-EX-J|Y
01|89719|12|2|Face cap (Vgrooves) End mill w/o oil hole|Y
01|89738|2|1|ETA 9/18|Y
01|89745|5|1|special pricing this quote only|Y
01|89761|1|1|Angle plate provided by Hillary for vertical use|Y
01|89761|1|2|500PSI hydraulic source with solenoid and pressure|Y
01|89761|1|3|switches to be provided by HIllary|Y
01|89761|1|4|Integration and installation of hydraulic source and|Y
01|89761|1|5|angle plate is the responsibility of Hillary|Y
01|89761|1|6|Customer/Hillary to take care of installation|Y
01|89761|2|1|Angle plate for CNC1600FA-M for vertical use|Y
01|89765|3|1|This is for 10mm|Y
01|89781|1|1|Quoted as NET pricingNon-cancelableNon-returnable|Y
01|89781|1|2|BMT45 ER25 fixed 77DEG L1=81mm 1:1 Gear ratiomax 25Nm|Y
01|89781|1|3|torque6500 RPM Int/Ext Coolant max p=1015PSI Ref|Y
01|89781|1|4|drawg#00053802|Y
01|89781|2|1|Quoted as NET pricingNon-cancelableNon-returnable|Y
01|89781|2|2|BMT45;ER16 Swiveling head +/- 107deg:L=121mm 1:1 Gear|Y
01|89781|2|3|ratio;max 12Nm torque;6500 RPM Int/Ext Coolant max|Y
01|89781|2|4|p=1015PSI Ref drawg#00052484|Y
01|89785|9|1|$13K per Machine|Y
01|89787|1|1|UNV# 525 CAT50-SF0625-5.00-GKN With Balance Holes|Y
01|89787|1|2|on Diameter Balanced 15000 RPM @ G2.5|Y
01|89788|1|1|SPECIAL DISCOUNT / NORMAL DISCOUNT 25%|Y
01|89788|9|1|4TH INTERFACE INCLUDES DRIVE CABLES FIBRE OPTICS|Y
01|89788|9|2|TRAVEL AND LABOR|Y
01|89788|9|3|MACHINE DATA SHEETS REQUIRED|Y
01|89789|1|1|This tool has been quoted with no arbor screw.|Y
01|89789|1|2|It was not noted on drawing.|Y
01|89790|1|1|This tool has been quoted with no arbor screw.|Y
01|89790|1|2|It was not noted on drawing.|Y
01|89801|2|1|Printer|Y
01|89803|1|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|89803|2|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|3|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|4|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|89803|5|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|6|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|89803|7|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|89803|8|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|89803|9|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|10|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|11|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|12|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|13|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|14|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|89803|15|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|89803|16|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|17|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|18|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|19|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|20|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89803|21|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|89841|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|89852|1|1|BT50-MOL2-160|Y
01|89852|2|1|BT50-MOL2-160|Y
01|89858|3|1|Printer|Y
01|89860|1|1|Reference RGA# TAR-51420|Y
01|89860|1|2|5AX-130BAYABR s/n: 1840|N
01|89867|1|1|Howa: H037M10 Threaded Draw Screw M78 X 2|Y
01|89867|1|2|Quoted at Net price|Y
01|89876|1|1|Ref:RGA#TOR-51521|Y
01|89876|1|2|B5005-0875-5.75(C)|Y
01|89876|1|3|Send in for evaluation.|Y
01|89881|2|1|Installation Includes Travel Expenses|Y
01|89881|3|1|External Power & Feedback Cables (2 Axes)|Y
01|89881|5|1|Tooling Certificate Included at No Additional Cost|Y
01|89884|3|1|External Power & Feedback Cables (2 Axis)|Y
01|89884|4|1|Machine Data Sheets Must Be Reviewed Prior To Order|Y
01|89884|4|2|Ladder Modifications May Be Required|Y
01|89884|4|3|Workholding Not Included in Quotation|Y
01|89884|6|1|$2000 Tooling Certificate - Included at No Cost|Y
01|89895|8|1|Collet Nut Wrench|Y
01|89895|9|1|Spindle Wrench|Y
01|89901|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|89910|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|89916|1|1|C6 Taper ER16 Collet Chuck with 100mm gauge length|Y
01|89916|2|1|C6 Taper ER20 Collet Chuck with 60mm gauge length|Y
01|89916|3|1|C6 Taper ER32 Collet Chuck with 60mm gauge length|Y
01|89916|4|1|C6 Taper  End Mill Holder with 80mm gauge length|Y
01|89916|5|1|C6 Taper 3/4 End Mill Holder with 65mm gauge length|Y
01|89927|1|1|TABLE ONLY. ALL ELECTRONICS SHEETMETAL JUNCTION|Y
01|89927|1|2|BOX INCLUDED|Y
01|89927|2|1|Rotary Joint TCD-A4157/0|Y
01|89930|1|1|UNV#1655 NMTB50-1.1/4 Stub Mill X 6.00 gage per print|Y
01|89930|1|2|Chip Hole Only|Y
01|89933|3|1|EXTERNAL CABLE SET INCLUDED|Y
01|89933|8|1|LYNDEX NIKKEN TOOL CERTIFICATE  2000 VALUE NO CHARGE|Y
01|89933|8|2|THIS OFFER IF 5 AXIS TABLE IS PURCHASED|Y
01|89949|1|1|Machine: Okuma LB300-M  *VDI40|Y
01|89957|1|1|AC4-TRX3/4-75 Capto C4 Milling Chuck 3/4 X 75|Y
01|89957|1|2|Alps Part #AC4-TRX19.05-75|Y
01|89969|5|1|Installation includes: Drive unit short bar fiber|Y
01|89969|5|2|optic cable communications cable bulk head cable set|Y
01|89969|5|3|external cable set parameter changes service time &|Y
01|89969|5|4|travel. 2 ADDITIONAL AXIS WILL BE PROVIDED|Y
01|89969|5|5|MACHINE LADDER NEEDS CONFIRMATION OF 2 ADDITIONAL AXIS|Y
01|89975|1|1|Ref:RGA#TAR-51491|Y
01|89975|1|2|Table is not holding consistent location.|Y
01|89976|2|1|** 4th axis unit **|Y
01|89976|2|2|Installation includes: drive unit short bar fiber|Y
01|89976|2|3|optic cables communication cables bulk head cable|Y
01|89976|2|4|set external cable set parameter changes service|Y
01|89976|2|5|time and travel|Y
01|89976|6|1|** 4th & 5th axis unit **|Y
01|89976|6|2|Installation includes: drive unit short bar fiber|Y
01|89976|6|3|optic cables communication cables bulk head cable|Y
01|89976|6|4|set external cable set parameter changes service|Y
01|89976|6|5|time and travel|Y
01|89978|2|1|*net price|Y
01|89978|2|2|*delivery is from spindle drawing confirmation|Y
01|89979|3|1|Installation includes: drive unit short bar fiber|Y
01|89979|3|2|optic cables communication cables bulk head cable|Y
01|89979|3|3|set external cable set parameter changes service|Y
01|89979|3|4|time and travel|Y
01|89992|5|1|In stock substitute for the out of stk BT40-SF0750-3.54|Y
01|89992|5|2|Price shown is at NET price|Y
01|89992|6|1|In stock substitute for the out of stk BT40-SF0750-3.54|Y
01|89992|6|2|Price is shown as NET price|Y
01|89997|5|1|M-SIGNAL CABLE FOR PROR TRAK|Y
01|90000|1|1|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|90012|11|1|INSTALLATION INCLUDE DRIVE CABLES BOTH INTERNAL|Y
01|90012|11|2|AND EXTERNAL. CONNECTORSFIBER OPTIC CABLES TRAVEL|Y
01|90012|11|3|AND LABOR. FANUC DATA SHEETS REQUIRED|Y
01|90014|18|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|90014|18|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|90014|18|3|THIS COST DOES NOT INCLUDE ANY PARAMETERS THAT FANUC|Y
01|90014|18|4|MAY NEED TO INSTALL. THIS CANNOT BE DETERMINED TILL|Y
01|90014|18|5|WE RECEIVE MACHINE DATA SHEETS ARE RECEIVED|Y
01|90014|18|6|THERE IS A POSSIBILITY THAT OUR TECH WILL BE ABLE TO|Y
01|90014|18|7|TURN ON.|Y
01|90014|20|1|NO CHARGE TOOL CERTIFICATE OFFERED WITH NEW MACHINE|Y
01|90014|20|2|PURCHASE WITH ROTARY TABLE|Y
01|90027|1|1|***Prepared with Sigma 1 motors***|Y
01|90028|2|1|Part # 1000TL-4(C) Backup Screw 1 Milling Chucks|Y
01|90028|2|2|1000TL-4(C) will work for gauge lengths 105-135mm|Y
01|90028|7|1|Part # 1250TL-4(C) Back Up Screw 1 1/4 Milling Chuck|Y
01|90028|7|2|1250TL-4(C) will work for gauge lengths 105-165mm|Y
01|90028|10|1|Lyndex Nikken Guarantees the Performance for these|Y
01|90028|10|2|Milling Chucks Backup Screws and Wrenches.|Y
01|90028|10|3|If they do not fuction as promised we will accept their|Y
01|90028|10|4|return at no cost to Andritz.|Y
01|90036|1|1|Reference RGA# TAR-51453|Y
01|90036|1|2|Repair of NSVZ300FA-M SN#NA|N
01|90041|2|1|custom 5C stepped hole collet. Thru hole 3/4|Y
01|90041|2|2|with major diameter of 1.020 x 0.150 deep|Y
01|90041|2|3|PER DRAWING|Y
01|90044|2|1|Part # 1000TL-4(C) Backup Screw 1 Milling Chucks|Y
01|90044|2|2|1000TL-4(C) will work for gauge lengths 105-135mm|Y
01|90044|6|1|Part #1250TL-4(C) backup screw 1 1/4 Milling Chuck|Y
01|90044|6|2|1250TL-4(C) will work for gauge lengths 105-165mm|Y
01|90044|7|1|Part # 1250TL-4(C) Back Up Screw 1 1/4 Milling Chuck|Y
01|90044|7|2|1250TL-4(C) will work for gauge lengths 105-165mm|Y
01|90047|9|1|4TH INREFACE INCLUDES SERVO AMPCONNECTORS MACHINE|Y
01|90047|9|2|CABLES FIBRE OPTICS TRAVEL LABOR TRAINING|Y
01|90047|9|3|QUOTE BASED UPON 2 INSTALLS AT THE SAME TIME|Y
01|90055|27|1|WP-13|Y
01|90072|4|1|Installation includes: drive unit short bar fiber|Y
01|90072|4|2|optic cables communication cables bulk head cable|Y
01|90072|4|3|set external cable set parameter changes service|Y
01|90072|4|4|time and travel|Y
01|90077|1|1|Ref:RGA#TAR-51341|Y
01|90077|1|2|Locational issue with one of T/R rotate units.|Y
01|90087|8|1|Lyndex-Nikken to make new position block upon|Y
01|90087|8|2|receipt of final spindle drawing|Y
01|90087|21|1|Lyndex-Nikken to make new position block upon|Y
01|90087|21|2|receipt of final spindle drawing|Y
01|90091|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|90091|2|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|90091|3|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|90092|1|1|Ref:RGA#TAR-51385|Y
01|90092|1|2|Having trouble with A axis.|Y
01|90097|1|1|$5000 L-N face value|Y
01|90105|17|1|Position block made by L&N.|Y
01|90105|17|2|Spindle drawing confirmation required.|Y
01|90113|1|1|The set includes: 2-twin spindle table sheet metal|Y
01|90113|1|2|drive units junction box external cables and cabinet|Y
01|90113|1|3|cable sets.|Y
01|90117|1|1|#12 Base Jaw for H018M8 Includes: #12 base/#13 key|Y
01|90117|1|2|#31 hex bolt. 1 set(=3p)|Y
01|90117|1|3|Quoted at net price to Butler Bros.|Y
01|90125|1|1|Cable and hose kits for Okuma table for M560 bulkhead|Y
01|90140|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|90140|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|90140|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|90140|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|90140|8|1|LYNDEX NIKKEN TOOL CERTIFICATE $ 2000 FACE VALUE N/C|Y
01|90141|1|1|BT30-SK12-80  Shrink Fit BT30 12MM|Y
01|90141|1|2|Net price reflects purchase order of 1~4 holders.|Y
01|90141|2|1|BT30-SK12-80  Shrink Fit BT30 12MM|Y
01|90141|2|2|Net price reflects purchase order of 5~9 holders.|Y
01|90141|3|1|BT30-SK12-80  Shrink Fit BT30 12MM|Y
01|90141|3|2|Net price reflects purchase order of 10+ holders.|Y
01|90152|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|90152|6|1|c + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|90152|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|90152|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|90152|6|5|MUST CONFIRM MACHINE LADDER FOR DDRT TABLE|Y
01|90152|6|6|PARAMETER DATA SHEETS NEEDED/ LADDER OPTION FOR DDRT|Y
01|90152|6|7|APPLICATION TO BE CONFIRMED. AIR PURGE INCLUDED|Y
01|90152|8|1|LYNDEX NIKKEN TOOL CERTIFICATE $ 2000 FACE VALUE N/C|Y
01|90159|2|1|Machine must be set-up for DDR Rotary Table|Y
01|90163|1|1|Sealed version is not available in this dimension|Y
01|90163|2|1|Sealed version is not available in this dimension|Y
01|90163|16|1|Sealed version is not available in this dimension|Y
01|90163|17|1|Sealed version is not available in this dimension|Y
01|90163|18|1|Sealed version is not available in this dimension|Y
01|90163|19|1|Sealed version is not available in this dimension|Y
01|90164|5|1|faceplate with T slots|Y
01|90171|1|1|Repair of Rotary Table 5AX-201OSP3-M S/N 5632|Y
01|90171|1|2|RGA # QUA-51345|Y
01|90171|1|3|Customer states that Rotary Axis is locked up.|Y
01|90199|1|1|This item is a substitute for the oil cap on the|Y
01|90199|1|2|5AX-250.  Price and Delivery is pending with|Y
01|90199|1|3|Nikken Japan for the exact replacement.|Y
01|90203|1|1|CNC180 conversion from TCS2C to S700X1|Y
01|90219|1|1|CNC260TOSP4-M Top Mounted Motor|Y
01|90219|3|1|Special Swing Box|Y
01|90225|1|1|INCLUDES AIR/HYDRAULIC TAILSTOCK 3 SPINDLE MT-105-3W|Y
01|90225|1|2|\|Y
01|90225|9|1|4TH INTERFACE INCLUDES DRIVE CABLES FIBRE OPTICS|Y
01|90225|9|2|TRAVEL AND LABOR|Y
01|90225|9|3|MACHINE DATA SHEETS REQUIRED|Y
01|90227|4|1|Alt  for CAT50U-MOL1.1/2-160|Y
01|90230|1|1|INCLUDES AIR/HYDRAULIC TAILSTOCK 3 SPINDLE MT-105-3W|Y
01|90230|1|2|\|Y
01|90230|9|1|4TH INTERFACE INCLUDES DRIVE CABLES FIBRE OPTICS|Y
01|90230|9|2|TRAVEL AND LABOR|Y
01|90230|9|3|MACHINE DATA SHEETS REQUIRED|Y
01|90235|2|1|C8-SK10-90|Y
01|90235|3|1|C8-SK10-120|Y
01|90235|4|1|C8-SK10-165|Y
01|90235|6|1|C8-SK16-60|Y
01|90235|7|1|C8-SK16-90|Y
01|90235|8|1|C8-SK16-120|Y
01|90235|9|1|C8-SK16-165|Y
01|90235|12|1|C8-SK25-90|Y
01|90235|13|1|C8-SK25-120|Y
01|90235|14|1|C8-SK25-165|Y
01|90235|17|1|C8-C3/4-105|Y
01|90235|18|1|C8-C3/4-165|Y
01|90235|21|1|C8-C1-105|Y
01|90235|22|1|C8-C1-165|Y
01|90235|23|1|C8-C1-165|Y
01|90235|26|1|C8-C1.1/4-105|Y
01|90235|27|1|C8-C1.1/4-135|Y
01|90235|28|1|C8-C1.1/4-165|Y
01|90239|1|1|A2-8 Adapter Included.|Y
01|90239|4|1|Unit Price Each.|Y
01|90245|2|1|Quoted as NET pricingNon-returnablenon-cancelable|Y
01|90271|18|1|INSTALLATION INCLUDES INSIDE CABLES FIBER OPTICS|Y
01|90271|18|2|ADDITIONAL DRIVES CONNECTORS TRAVEL & LABOR|Y
01|90271|18|3|THIS COST DOES NOT INCLUDE ANY PARAMETERS THAT FANUC|Y
01|90271|18|4|MAY NEED TO INSTALL. THIS CANNOT BE DETERMINED TILL|Y
01|90271|18|5|WE RECEIVE MACHINE DATA SHEETS ARE RECEIVED|Y
01|90271|18|6|THERE IS A POSSIBILITY THAT OUR TECH WILL BE ABLE TO|Y
01|90271|18|7|TURN ON.|Y
01|90271|20|1|NO CHARGE TOOL CERTIFICATE OFFERED WITH NEW MACHINE|Y
01|90271|20|2|PURCHASE WITH ROTARY TABLE|Y
01|90273|1|1|Hydraulic Unit/Brake included|Y
01|90273|1|2|External cable set included|Y
01|90282|9|1|Cable Set|Y
01|90282|10|1|Includes drive unit fiber optic cable interface|Y
01|90282|10|2|cable external cable short bar communications cable|Y
01|90282|10|3|labor and travel.|Y
01|90288|1|1|BT30 Hydraulic Chuck 1/5 Bore Diameter 3.15 gage line|Y
01|90288|1|2|NO Drive slots on ATC Flange|Y
01|90290|11|1|4TH INREFACE INCLUDES SERVO AMPCONNECTORS MACHINE|Y
01|90290|11|2|CABLES FIBRE OPTICS TRAVEL LABOR TRAINING|Y
01|90290|11|3|QUOTE BASED UPON COORDINATING 2 INSTALLS AT SAME TIME|Y
01|90295|4|1|Nut Wrench-ER25I and Spindle Wrench-MIM-107446 included|Y
01|90304|2|1|HFO TAMPA TO SUPPLY MOTORS AND CABLE|Y
01|90309|2|1|TABLE SPEC SAME AS S/N 6641 ALREADY AT AWNC|Y
01|90309|2|2|THIS TABLE TO INCLUDE SERVO MOTOR AND 10 + 1 ROTARY|Y
01|90309|2|3|UNION SAME AS ORIGINAL TABLE. WITH SPECIAL FACEPLATE|Y
01|90309|2|5|DELIVERY 7/20 + SHIPPING FROM JAPAN.|Y
01|90309|2|8|****** PLEASE NOTE THIS TABLE MUST BE REMOVED AND|Y
01|90309|2|9|INSTALLED BY THE MACHINE BUILDER HORKOS!!!!!!|Y
01|90311|2|1|DIRECT REPLACEMENT FOR S/N 11607 INCLUDING 10+1 BUILT|Y
01|90311|2|2|IN ROTARY UNION SERVO MOTOR.|Y
01|90311|2|3|*******TABLE MUST BE REMOVED AND INSTALLED BY ORIGINAL|Y
01|90311|2|4|MACHINE MFG HORKOS|Y
01|90311|2|5|DELIVERY 6/20 + SHIPPING|Y
01|90314|11|1|33/64 = .5156 = 13.09|Y
01|90326|4|1|We can break apart the collet set to ship the collets|Y
01|90326|4|2|in stock.  P/N: SK6-2.75 on b/o to complete the set|Y
01|90369|1|1|ref. 155460|Y
01|90394|3|1|External Power/Feedback Cables (2 Axis)|Y
01|90394|8|1|$2000 Tooling Certificate - Included @ No Cost|Y
01|90408|6|1|SCALE FOR TILT AXIS|Y
01|90408|8|1|SCALE FOR ROTARY AXIS|Y
01|90408|10|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|90408|12|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|90408|12|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|90408|12|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|90409|6|1|CN450BB049|Y
01|90409|33|1|ISE40A-01-T-M-X501 (SMC Switch)|Y
01|90416|1|1|Includes Haas motors and cables|Y
01|90426|1|1|QC 5/8 Square Cross to Royal Part #44788 see cat page|Y
01|90427|1|1|CNC180 complete conversion from Brother to Fanuc|Y
01|90427|3|1|CNC180 complete conversion from Brother to Mitsubishi|Y
01|90429|3|1|External Power & Feedback Cables (2 Axis)|Y
01|90429|4|1|Machine Data Sheets Must Be Reviewed Prior To Order|Y
01|90429|4|2|Ladder Modifications May Be Required|Y
01|90429|4|3|Workholding Not Included in Quotation|Y
01|90429|6|1|$2000 Tooling Certificate - Included at No Cost|Y
01|90436|1|1|CNC200TOSP4-M TOP MOTOR|Y
01|90436|2|1|Special Swing Box for CNC303TOSP4-M|Y
01|90449|1|1|Installed w/ PS-130E pull stud|Y
01|90449|2|1|Installed on BT30-TB40-150|Y
01|90450|3|1|External Power & Feedback Cable for 4th Axis|Y
01|90450|9|1|$1000 Tooling Certificate Included at No Cost|Y
01|90477|9|1|*only avail in Coolant Port|Y
01|90479|2|1|Coolant nut SKN-6WBJ(GH) installed on the holder|Y
01|90479|4|1|Coolant nut SKN-10BJ(GH) installed on the holder|Y
01|90479|6|1|Coolant nut SKN-16BJ(GH) installed on holder|Y
01|90479|8|1|Coolant nut SKN-25BJ(GH) installed on the holder|Y
01|90486|1|1|Reference RGA# TAR-51413|Y
01|90486|1|2|5AX-201 s/n: 5623|N
01|90487|1|1|Ref:RGA#TOR-51578|Y
01|90487|1|2|Send in for evaluation.|Y
01|90487|2|1|Setscrew was loose and need to calibrate.|Y
01|90494|1|1|OS = Okuma Standard|Y
01|90494|1|2|R1774 (Adapter NOT Included --> available at additional|Y
01|90494|1|3|cost|Y
01|90496|1|1|NBT30-SK25-105P|Y
01|90496|1|2|Dual Contact BT30 SK25 Hi-Speed Slim Chuck w 105mm g.l.|Y
01|90500|1|1|Ref:RGA#TOR-51596|Y
01|90500|1|2|Tip has damage.|Y
01|90502|3|1|Complete installation kit minus drives|Y
01|90504|1|1|Tooling Certificate Number:|Y
01|90506|4|1|Junction Box|Y
01|90509|1|1|Hydraulic unit with hoses and pressure switches.|Y
01|90509|2|1|Service time to convert from air to hydraulic brake.|Y
01|90509|3|1|Installation of hydraulic unit to machine control.|Y
01|90514|1|1|Includes Cable Set|Y
01|90514|2|1|Includes Cable Set|Y
01|90529|1|1|CAT50-SZF25-120U-J-IDU Holder with SKN-25BJ installed|Y
01|90529|1|2|and part number PT458202REV laser marked on holder.|Y
01|90529|1|3|Net price reflects a purchase order of minimum 20|Y
01|90529|1|4|toolholders.|Y
01|90529|2|1|CAT50-SZF25-120U-J-IDU Holder with SKN-25BJ installed|Y
01|90529|2|2|and part number PT458202REV laser marked on holder.|Y
01|90529|2|3|Net price reflects a purchase order of 60 holders.|Y
01|90545|1|1|Due to this item being discontinued no tooling|Y
01|90545|1|2|certificate is included. New pricing structure does not|Y
01|90545|1|3|apply to this item.|Y
01|90547|4|1|Includes: labor expenses travel interface/external|Y
01|90547|4|2|cables cabinet small cables|Y
01|90562|1|1|YASNAC MOTORS AND CABLES TO BE SUPPLIED BY HFO|Y
01|90564|2|1|Includes ID Chip hole and Installation of Chip|Y
01|90564|2|2|Rebalancing to 20000RPM|Y
01|90566|3|1|Rotary union adpater plate and support bracket.|Y
01|90570|1|1|FOR NEW OKUMA CONTROL OSP4 NEEDED. SAME PRICE|Y
01|90572|8|1|SCALE FOR ROTARY AXIS|Y
01|90589|11|1|NCAT50-SF0625-3.15CP|Y
01|90589|12|1|NCAT50-SF0500-5.12CP|Y
01|90589|13|1|NCAT50-SF0750-5.12CP|Y
01|90597|1|1|This item is a complete special once a purchase|Y
01|90597|1|2|order is placed it cannot be cancelled or returned.|Y
01|90613|6|1|14 fact stk ETA 1-2wks ARO 5 ETA 5/1 bal 12-13wks|Y
01|90613|6|2|price break at 100pcs|Y
01|90613|8|1|2 pcs stk 7 pcs ETA 5/1 bal 12-13wks|Y
01|90626|1|1|Kazu completed service call on 3/26/18.|Y
01|90626|1|2|5AX-200II SN#2204|Y
01|90626|1|3|Labor:$135 x 5.33 = $719.55|Y
01|90626|1|4|Travel time:$100 x 18 = $1800|Y
01|90626|1|5|Air fare & Car rental: $807.45|Y
01|90626|1|6|Hotel& Meal: $484.26|Y
01|90626|1|7|Mnotor Expediting & Express shipping: no charge|Y
01|90626|1|8|Travel time and labor for table evaluation: no charge.|Y
01|90637|2|1|*internal coolant/ext coolant - can run dry 24/7 !|Y
01|90658|1|1|Reference RGA# TAR-51308|Y
01|90658|1|2|5AX-130ZA s/n: 1915|N
01|90663|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|90663|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|90668|1|1|CAT45-SCA15.875-90U|Y
01|90668|1|2|CAT45 Stub Mill Holder 15.875mm w/90mm gage length.|Y
01|90669|1|1|Modify to CAT40-SZF10F-120U-IDU DIN HOLDER|Y
01|90693|6|1|NET PRICE QUOTED|Y
01|90694|1|1|Capto C6 ER16 100mm GL (Sandvik # C6-391.14-16 100)|Y
01|90694|2|1|Capto C6 ER20 100mm GL (Rego # 2806.12020.100)|Y
01|90694|3|1|Capto C6 ER32 60mm GL (Sandvik # C6-391.14-32 060)|Y
01|90694|4|1|Capto C6 1/2 EM Holder (Seco # C6-391.5803-050080)|Y
01|90694|5|1|Capto C6 3/4 EM Holder (Sandvik # C6-391.20-19 065A)|Y
01|90702|10|1|Modification DIN B Service|Y
01|90703|1|1|ST20-SK6-81|Y
01|90703|2|1|ST3/4-SK6-81|Y
01|90703|3|1|ST20-SK6-141|Y
01|90703|4|1|ST3/4-SK6-141|Y
01|90703|5|1|ST25-SK10-142|Y
01|90703|6|1|ST1-SK10-142|Y
01|90713|8|1|SK25-18AC|Y
01|90762|1|1|USED UNIT. NET PRICE|Y
01|90772|6|1|for .234|Y
01|90796|1|1|Buy 12 holders get the 13th holder free|Y
01|90803|1|1|Used cannot be returned or canceled.|Y
01|90813|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|90838|2|1|Please note; PS-381E is non standard stock. Once a|Y
01|90838|2|2|purchase order is placed it cannotbe cancelled or|Y
01|90838|2|3|returned.|Y
01|90873|27|1|This attachment to the TQW-150 which can serve as|Y
01|90873|27|2|horizontal tightening fixture.We do not have an exact|Y
01|90873|27|3|match|Y
01|90873|28|1|This version has coolant portsnon CP version 12-14wks|Y
01|90873|28|2|delivery|Y
01|90874|4|1|External Power/Feedback Cables (1 Axis)|Y
01|90875|1|1|Rotary Table Built for OSP Specifications|Y
01|90875|3|1|70mm Riser for Tailstock|Y
01|90875|4|1|Power/Feedback Cables (2 Axis)|Y
01|90879|1|1|Please note: There will be a minimum requirement of|Y
01|90879|1|2|10 H50E-SF4-80.|Y
01|90880|6|1|47 + 3 spares|Y
01|90897|1|1|CAT45-SCA15.875-90U Stub Mill Holder|Y
01|90899|1|1|MCT45-20|Y
01|90899|1|2|Adapter (20mm Milling chuck) for NIKKEN quick change|Y
01|90899|1|3|master holder.|Y
01|90899|2|1|MCT45-22|Y
01|90899|2|2|Adapter (22mm Milling chuck) for NIKKEN quick change|Y
01|90899|2|3|master holder.|Y
01|90899|3|1|MCT45-25|Y
01|90899|3|2|Adapter (25mm Milling chuck) for NIKKEN quick change|Y
01|90899|3|3|master holder.|Y
01|90899|4|1|MCT45-32|Y
01|90899|4|2|Adapter (32mm Milling chuck) for NIKKEN quick change|Y
01|90899|4|3|master holder.|Y
01|90899|5|1|MCT45-42|Y
01|90899|5|2|Adapter (42mm Milling chuck) for NIKKEN quick change|Y
01|90899|5|3|master holder.|Y
01|90899|6|1|TT45-MT1|Y
01|90899|6|2|Adapter (MT1) for NIKKEN quick change|Y
01|90899|6|3|master holder.|Y
01|90899|7|1|TT45-MT2|Y
01|90899|7|2|Adapter (MT2) for NIKKEN quick change|Y
01|90899|7|3|master holder.|Y
01|90899|8|1|TT45-MT3|Y
01|90899|8|2|Adapter (MT3) for NIKKEN quick change|Y
01|90899|8|3|master holder.|Y
01|90899|9|1|TT45-MT4|Y
01|90899|9|2|Adapter (MT4) for NIKKEN quick change|Y
01|90899|9|3|master holder.|Y
01|90899|10|1|DT45-NPU13|Y
01|90899|10|2|Adapter (Drillchuck) for NIKKEN quick change|Y
01|90899|10|3|master holder.|Y
01|90899|11|1|FT45-22|Y
01|90899|11|2|Adapter (22mm Face Mill) for NIKKEN quick|Y
01|90899|11|3|change master holder.|Y
01|90899|12|1|FT45-32|Y
01|90899|12|2|Adapter (32mm Face Mill) for NIKKEN quick change|Y
01|90899|12|3|master holder.|Y
01|90899|13|1|FT45-3|Y
01|90899|13|2|Adapter (25.4mm=1 Face Mill) for NIKKEN quick|Y
01|90899|13|3|change master holder.|Y
01|90899|14|1|FT45-4|Y
01|90899|14|2|Adapter (31.75mm=1.1/4Face Mill) for NIKKEN quick|Y
01|90899|14|3|change master holder.|Y
01|90899|15|1|FT45-5|Y
01|90899|15|2|Adapter (38.1mm=1.1/2 Face Mill) for NIKKEN quick|Y
01|90899|15|3|change master holder.|Y
01|90899|16|1|FT45-6|Y
01|90899|16|2|Adapter (50.8mm=2 Face Mill) for NIKKEN quick change|Y
01|90899|16|3|master holder.|Y
01|90913|12|1|COMMUNICATIONS CABLE  A660-2005-T626/L150R0A|Y
01|90939|2|1|Check and see if end user has a 5/16 hex wrench.|Y
01|90940|1|1|Ref:RGA#TOR-51423|Y
01|90940|1|2|HSK100A-C20EX-115 is unrepairable.|Y
01|90943|1|1|H09M10 U-585 10 6-jaw power chuck For  MORI NLX2500|Y
01|90943|1|2|with A8J adapter.|Y
01|90943|1|3|Quoted at Net Price|Y
01|90943|3|1|H09M8 U-584 8 6-jaw power chuck For  MORI NLX2500|Y
01|90943|3|2|A5J adapter included|Y
01|90943|3|3|Quoted at Net Price|Y
01|90948|1|1|Part Number To Be Determined|Y
01|90948|1|2|CAT50 AGH Small type offsetLength 4.5/ 6.53/16di|Y
01|90948|1|3|A=80mm; d=20mm; L=208mm;|Y
01|90948|1|4|1:1.67 Gear Ratio; Max torque M=6Nm|Y
01|90948|1|5|Max n= 7200RPM;|Y
01|90948|1|6|Without coolant;Ref drawg# 00053921|Y
01|90948|1|7|Net price reflects a purchase order of one head.|Y
01|90948|2|1|CAT50 AGH Small type offset;Length 4.5/6.53/16dia|Y
01|90948|2|2|A=80mm; d=20mm; L=208mm;1:1.67 Gear Ratio:|Y
01|90948|2|3|Max torque M=6Nm;Max n= 7200RPM;Without coolant;|Y
01|90948|2|4|Ref drawg# 00053921|Y
01|90948|2|5|Net price reflects a purchase order of two heads.|Y
01|90952|1|1|ALL ITEMS IN STOCK WITH EXCEPTION OF SERVO MOTORS|Y
01|90952|1|2|SERVO MOTORS ON ORDER WITH YASKAWA AMERICA. DELIVERY|Y
01|90952|1|3|\ROM YASKAWA LYNDEX NIKKEN BEING A DELIVERY OF 6 WEEKS|Y
01|90952|1|4|LYNDEX NIKKEN DELIVERY HAS BEEN PUSHED OUT BEFORE ON|Y
01|90952|1|5|THESE MOTORS.|Y
01|90952|1|7|THIS QUOTE REFLECT 2 COMPLETE SETS|Y
01|90956|3|1|ALL ITEMS IN STOCK WITH EXCEPTION OF SERVO MOTORS WHICH|Y
01|90956|3|2|HAVE BEEN ON ORDER WITH YASKAWA AMERICA. RECENT INFO ON|Y
01|90956|3|3|DELIVERY IS 6 WEEKS. WE HAVE BEEN TOLD THIS BEFOR AND|Y
01|90956|3|4|DELIVRERY PUSHED BACK.|Y
01|90959|1|1|SK6-3.75A  - Must be on size|Y
01|90961|3|1|External Power/Feedback Cable (1 Axis)|Y
01|90961|5|1|$2000 Tooling Certificate at No Additional Cost|Y
01|90962|3|1|External Power/Feedback Cables (2 Axes)|Y
01|90962|5|1|$2000 Tooling Certificate at No Additional Cost|Y
01|90966|3|1|*Coolant-Through the tool|Y
01|90966|3|2|Pre-balanced to 10000 RPM|Y
01|90979|2|1|Upon confirmation of spindle drawing receipt|Y
01|90997|2|1|Okuma part# 1558-2501|Y
01|91006|1|1|Sealed version is not available in this dimension|Y
01|91006|2|1|Sealed version is not available in this dimension|Y
01|91006|16|1|Sealed version is not available in this dimension|Y
01|91006|17|1|Sealed version is not available in this dimension|Y
01|91006|18|1|Sealed version is not available in this dimension|Y
01|91006|19|1|Sealed version is not available in this dimension|Y
01|91008|1|1|HFO TO SUPPLY MOTORS AND CABLES|Y
01|91008|1|3|MAKE NOTE ABOVE P/N TO BE CNCZ-202LYA|Y
01|91023|5|1|Please Note: These are from our used shelf.|Y
01|91034|1|1|NMTB50 End Mill Holder 1.1/4 X 5.625 Gage Length|Y
01|91034|1|2|With 5-Deg Whistle Notch/Spiral Lock Thread|Y
01|91034|1|3|Per UNV#15 Drawing|Y
01|91035|6|1|Slotted Arbor screw for C4001-1000DIN-M|Y
01|91037|3|1|EXTERNAL POWER/FEEDBACK CABLES (4TH AXIS)|Y
01|91040|1|1|Special Rotary Table Horizontal Use With scale and rise|Y
01|91040|1|2|Special modification cost included.|Y
01|91040|1|3|1-5 units purchase price.|Y
01|91040|2|1|6+1 Rotary Joint|Y
01|91040|2|2|1-5 units purchase price.|Y
01|91040|4|1|Special Rotary Table Horizontal Use With scale and rise|Y
01|91040|4|2|Special modification cost included.|Y
01|91040|4|3|6-10 units purchase price.|Y
01|91040|5|1|6+1 Rotary Joint|Y
01|91040|5|2|6-10 units purchase price.|Y
01|91045|1|1|NMTB50 End Mill Holder 1.1/4 X 5.625 Gage Length|Y
01|91045|1|2|With 5-Deg Whistle Notch/Spiral Lock Thread|Y
01|91045|1|3|Per UNV#15 Drawing|Y
01|91047|1|1|NMTB50 End Mill Holder 1.1/4 X 5.625 Gage Length|Y
01|91047|1|2|With 5-Deg Whistle Notch/Spiral Lock Thread|Y
01|91047|1|3|Per UNV#15 Drawing|Y
01|91048|1|1|KIT INCLUDES CNC180 INDEXER A21 CONTROL BOX|Y
01|91048|1|2|PROGRAMABLE PENDANT M CODE CABLE AND POWER CABLE|Y
01|91050|3|1|EXTERNAL POWER/FEEDBACK CABLES (4TH AXIS)|Y
01|91055|1|1|Includes Hurco Motors and Cables|Y
01|91056|1|1|25% Core Buy-Back to Customer & 20% Distributor Disc.|Y
01|91056|1|2|Core Buy-Back is available on first tool purchase only.|Y
01|91075|1|1|Questionnaire to be filled out for position block info|Y
01|91081|3|1|Includes all Electronic and Labor @ SLP|Y
01|91084|2|1|6-port rotary union|Y
01|91088|2|1|Installation includes: drive unit short bar fiber|Y
01|91088|2|2|optic cables communication cables bulk head cable|Y
01|91088|2|3|set external cable set parameter changes service|Y
01|91088|2|4|time and travel|Y
01|91096|8|1|DIN MODIFY P/N: CAT40-SK10F-90U-IDU-DIN|Y
01|91096|9|1|DIN MODIFY P/N: CAT40-SK16F-90U-IDU-DIN|Y
01|91098|2|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|2|2|at factory.  Pull stud is at additional charge.|Y
01|91098|2|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|2|4|in order to proceed.|Y
01|91098|3|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|3|2|at factory.  Pull stud is at additional charge.|Y
01|91098|3|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|3|4|in order to proceed.|Y
01|91098|4|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|4|2|at factory.  Pull stud is at additional charge.|Y
01|91098|4|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|4|4|in order to proceed.|Y
01|91098|5|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|5|2|at factory.  Pull stud is at additional charge.|Y
01|91098|5|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|5|4|in order to proceed.|Y
01|91098|6|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|6|2|at factory.  Pull stud is at additional charge.|Y
01|91098|6|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|6|4|in order to proceed.|Y
01|91098|7|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|7|2|at factory.  Pull stud is at additional charge.|Y
01|91098|7|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|7|4|in order to proceed.'|Y
01|91098|8|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|8|2|at factory.  Pull stud is at additional charge.|Y
01|91098|8|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|8|4|in order to proceed.|Y
01|91098|9|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|9|2|at factory.  Pull stud is at additional charge.|Y
01|91098|9|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|9|4|in order to proceed.|Y
01|91098|10|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|10|2|at factory.  Pull stud is at additional charge.|Y
01|91098|10|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|10|4|in order to proceed.|Y
01|91098|11|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|11|2|at factory.  Pull stud is at additional charge.|Y
01|91098|11|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|11|4|in order to proceed.|Y
01|91098|12|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|12|2|at factory.  Pull stud is at additional charge.|Y
01|91098|12|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|12|4|in order to proceed.|Y
01|91098|13|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|13|2|at factory.  Pull stud is at additional charge.|Y
01|91098|13|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|13|4|in order to proceed.|Y
01|91098|14|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|14|2|at factory.  Pull stud is at additional charge.|Y
01|91098|14|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|14|4|in order to proceed.|Y
01|91098|15|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|15|2|at factory.  Pull stud is at additional charge.|Y
01|91098|15|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|15|4|in order to proceed.|Y
01|91098|16|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|16|2|at factory.  Pull stud is at additional charge.|Y
01|91098|16|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|16|4|in order to proceed.|Y
01|91098|17|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|17|2|at factory.  Pull stud is at additional charge.|Y
01|91098|17|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|17|4|in order to proceed.|Y
01|91098|18|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|18|2|at factory.  Pull stud is at additional charge.|Y
01|91098|18|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|18|4|in order to proceed.|Y
01|91098|19|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|19|2|at factory.  Pull stud is at additional charge.|Y
01|91098|19|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|19|4|in order to proceed.|Y
01|91098|20|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|20|2|at factory.  Pull stud is at additional charge.|Y
01|91098|20|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|20|4|in order to proceed.|Y
01|91098|21|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|21|2|at factory.  Pull stud is at additional charge.|Y
01|91098|21|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|21|4|in order to proceed.|Y
01|91098|22|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|22|2|at factory.  Pull stud is at additional charge.|Y
01|91098|22|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|22|4|in order to proceed.|Y
01|91098|24|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|24|2|at factory.  Pull stud is at additional charge.|Y
01|91098|24|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|24|4|in order to proceed.|Y
01|91098|26|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|26|2|at factory.  Pull stud is at additional charge.|Y
01|91098|26|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|26|4|in order to proceed.'|Y
01|91098|27|1|**Nikken Pull Stud (part# PS-xxx) must be installed|Y
01|91098|27|2|at factory.  Pull stud is at additional charge.|Y
01|91098|27|3|The Pull Stud part# must be determined at time of PO|Y
01|91098|27|4|in order to proceed.|Y
01|91124|1|1|Reference RGA# TAR-51265|Y
01|91124|1|2|5AX-2MT-105-120FA-M s/n: 8085|N
01|91134|1|1|Part # HH9C-200-R3517 Rotary Cylinder HH9C200 R-3517|Y
01|91135|5|1|INCLUDES FANUC DRIVE|Y
01|91135|5|2|DOES NOT INCLUDE ACTIVATING 4TH AXIS OPTION ON|Y
01|91135|5|3|CONTROL IF NEEDED.|Y
01|91138|1|1|Ref:RGA#TAR-51587|Y
01|91138|1|2|Send in for evaluation.|Y
01|91149|5|1|C4017-0040-5.00DIN|Y
01|91151|1|1|Ref:RGA#TAR-51603|Y
01|91151|1|2|Send in for evaluation.|Y
01|91160|1|1|Includes: Table with motors and cable sets.|Y
01|91161|1|1|Net Price quoted.|Y
01|91165|1|1|Includes: Table with motors and cable sets.|Y
01|91190|1|1|Includes Haas motors and cables|Y
01|91190|2|1|Complimentary Tooling Certificate w/5AX Table Purchase|Y
01|91207|1|1|Ref:TOR-51706|Y
01|91207|1|2|PF-2|Y
01|91207|1|3|Send in for evaluation.|Y
01|91210|1|1|Reference RGA# TAR-51560|Y
01|91210|1|2|5AX-2002 s/n: 2151|N
01|91222|1|1|Special Live tool for EMAG DUO VL3 - VDI40 Connection|Y
01|91222|1|2|Straight Tool x 3 HSK63C Outputs|Y
01|91222|1|3|Outputs 120 deg apart on 88mm B.C.|Y
01|91222|1|4|1.5:1 Gear Ratio 6000RPM Input -> Max 4000RPM Output|Y
01|91222|1|5|Max Torque 15Nm/Spindle|Y
01|91222|2|1|Same specifications as above for 1 pc|Y
01|91236|1|1|CNC260LSA-BR2 260mm Face plate Rotary Table|Y
01|91236|1|2|Includes AMP and cables.|Y
01|91251|4|1|Offered mech sealed optioncust may want by Monday|Y
01|91254|9|1|In stock option to the E11-017.If coolant is not thru|Y
01|91254|9|2|the cutter tool this can be used|Y
01|91275|2|1|Adapter plate|Y
01|91275|3|1|Labor for installing rotary union + piping + manifold|Y
01|91275|3|2|block note this has to be done at Lyndex Nikken|Y
01|91279|1|1|Net Price Quoted|Y
01|91289|9|1|2pcs stock 1 pc ETA 6/8/2018|Y
01|91290|3|1|NBT30-MDSK16-75P-J is actual Part# with MDSKN-16BJ|Y
01|91290|3|2|Hi-Speed Coolant Nut installed prior to shipping.|Y
01|91290|3|3|**Please be certain to use NBT30-MDSK16-75P-J when you|Y
01|91290|3|4|order.**|Y
01|91294|1|1|UNV_463 HSK125A-0500A-5.750-ID-GKN With Whistle Notch|Y
01|91294|1|2|ID Chip Hole Only/Drawing C1000|Y
01|91298|1|1|Tooling Certificate #20880-1140-030918|Y
01|91307|1|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|91307|2|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|3|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|4|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|91307|5|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|6|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|91307|7|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|91307|8|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|91307|9|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|10|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|11|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|12|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|13|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|14|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|91307|15|1|On SO#730711 / Inv #2135003 3/15/20017|Y
01|91307|16|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|17|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|18|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|19|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|20|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91307|21|1|On SO#730831 / Inv #2135096 3/15/20017|Y
01|91330|1|1|Ref:RGA#TOR-51556|Y
01|91330|1|2|Send in for evaluation.|Y
01|91330|1|3|CAT50-C1.1/4F-105U|Y
01|91332|1|1|This tooling certicate will allow Palmetto State Armory|Y
01|91332|1|2|to purchase $26650 worth of List Price tooling.|Y
01|91332|9|1|2pcs stock 1 pc ETA Pending|Y
01|91332|13|1|Please note 1 postitioning block is required for every|Y
01|91332|13|2|machine that will be utilizing a right angle head.|Y
01|91337|3|1|ZKG12-.255s-100Llong size touch tap collet|Y
01|91337|4|1|ZKG16-.255s-100Llong size touch tap collet|Y
01|91337|5|1|ZKG12-6s-100Llong size touch tap collet|Y
01|91337|6|1|ZKG16-6s-100Llong size touch tap collet|Y
01|91348|1|1|Includes: Table with motors and cable sets.|Y
01|91349|1|1|Ref:RGA#TOR-51595|Y
01|91349|1|2|C50S5-0875-3.90|Y
01|91349|1|3|Send in for evaluation.|Y
01|91349|2|1|Ground down edges tool operates  smoothly.|Y
01|91363|1|1|Ref:RGA#CUR-51563|Y
01|91363|1|2|Need to rebuild.|Y
01|91363|1|3|C40RAM-ER25-215ST sn#35515 01|Y
01|91363|2|1|Replace all bearings seals and o-rings|Y
01|91363|2|2|Labor is included.|Y
01|91365|1|1|Includes table with motors and cable sets|Y
01|91365|1|2|Does not include installation|Y
01|91365|1|3|Will need to confirm machine/control model and make|Y
01|91380|1|1|******TABLE IS LEFT HAND VERSION*******|Y
01|91380|1|2|******PART IS CNCZ-100-2W-120LOSP4-M*****|Y
01|91380|1|3|THIS P/N REFLECTS OSP-MA CONTROL WITH PROPER SERVO|Y
01|91380|1|4|MOTOR.|Y
01|91380|3|1|POWER AND FEEDBACK CABLES INCLUDED|Y
01|91394|2|1|NET PRICE|Y
01|91394|2|2|Lyndex-Nikken can make the position block upon receipt|Y
01|91394|2|3|of machine spindle information|Y
01|91396|1|1|RGA# PENDING|Y
01|91396|1|2|CNCZ180LSA-BR2  SN#20128T|N
01|91413|1|1|Model#: GM81999-473|Y
01|91413|1|2|Z-AXIS MILLING HOLDER 4320RPM(1:2) ER32|Y
01|91413|1|3|Special Order. Net Price Each.|Y
01|91421|1|1|Special pricing due to increased cost of motors and|Y
01|91421|1|2|drive units|Y
01|91421|1|3|No tooling cert for TC-32BN machines|Y
01|91423|12|1|No sealed version available|Y
01|91424|2|1|With special faceplate and A06B-2227-B000 motor|Y
01|91424|3|1|with special faceplate|Y
01|91430|3|1|DELIVERY INFO PENDING WORD FROM NIKKEN|Y
01|91430|6|1|Rotary Union P/N TCD-37499 NEW|Y
01|91430|6|2|Spoke with Nikken and previous PTS purchase was New|Y
01|91430|6|4|Original Rotary Union was reconditioned before|Y
01|91431|2|1|HSK80-PLUG for H80F-SF0750-6.00B|Y
01|91439|1|1|CAT50; ER32; Angle Head; direct flange mounted to|Y
01|91439|1|2|machine spindle; Central coolant supply through spindle|Y
01|91439|1|3|/ext coolant over pipe;|Y
01|91439|1|4|Max p=1015PSI Input is reversal to output; L=560mm;|Y
01|91439|1|5|L1=535mm; 1:1 Gear ratio; 6500RPM; Max torque M=70Nm|Y
01|91439|1|6|Ref drawing#00053947|Y
01|91439|1|7|P/N: 192937|Y
01|91440|1|1|CAT50; ER32; AGH; direct flange mounted to machine|Y
01|91440|1|2|spindle; Central coolant supply through spindle/ext|Y
01|91440|1|3|coolant over pipe; Max p=1015 PSI; Input is reversal|Y
01|91440|1|4|to output; L=560mm; L1=535mm;1:1 Gear ratio; 6500 RPM|Y
01|91440|1|5|Max torque M=70Nm; Ref draw# 00053947|Y
01|91440|1|6|A192937|Y
01|91440|1|7|-|N
01|91440|1|8|DELIVERY: 14 WEEKS upon receipt of your purchase order|N
01|91440|1|9|after final clarification / approval drawings have been|N
01|91440|1|10|a|N
01|91460|1|1|Reference RGA# TAR-51655|Y
01|91460|1|2|5AX-230HFA s/n: 5421|N
01|91469|1|1|Shrink Fit Capto C6 POT|Y
01|91472|1|1|Model#:GM81999-473|Y
01|91472|1|2|Z-Axis Milling Holder 4320RPM output (1:1.2) ER32|Y
01|91472|1|3|Special Order: no canlelabe no refundable|Y
01|91472|1|4|Unit price each|Y
01|91504|3|1|1 adapter sleeve for above boring holder|Y
01|91504|4|1|3/4 adapter sleeve for above boring holder|Y
01|91504|5|1|1/2 adapter sleeve for above boring holder|Y
01|91504|6|1|3/8 adapter sleeve for above boring holder|Y
01|91504|7|1|32mm adapter sleeve for above boring holder|Y
01|91509|1|1|Quoted at Net Price|Y
01|91509|2|1|Quoted at Net Price|Y
01|91509|3|1|Quoted at Net Price|Y
01|91509|4|1|Quoted at Net Price|Y
01|91514|1|1|External Coolant|Y
01|91514|2|1|Internal Coolant. Can be run with External Coolant or|Y
01|91514|2|2|run dry.|Y
01|91514|3|1|External Coolant. CCW Input to CW Output.|Y
01|91514|4|1|Internal Coolant. Can be run with External Coolant or|Y
01|91514|4|2|run Dry. CCW Input to CW Output.|Y
01|91520|1|1|Installed with PS-N46E at factory|Y
01|91542|4|1|NET PRICE|Y
01|91544|2|1|Includes: bulkhead cable set external cable set|Y
01|91544|2|2|parameter changes service time and travel.|Y
01|91544|3|1|Convert table to Alpha 8is motor.|Y
01|91544|3|2|Includes: Motor motor gear wire harness solenoid|Y
01|91544|3|3|pressure switch motor cover and labour.|Y
01|91548|1|1|Conversion of CNC302AA21 to CNC302FA-M: Includes motor|Y
01|91548|1|2|gear wire harness solenoidpressure switch cover|Y
01|91548|1|3|and labour. Table must be sent to Lyndex-Nikken.|Y
01|91548|2|1|Drive units are special order and cannot be cancelled.|Y
01|91548|2|2|Machine must have compatible drives and controls.|Y
01|91548|2|3|Due to the age of the control the drives must be|Y
01|91548|2|4|ordered in sets of five. Delivery is pending.|Y
01|91575|3|1|MIM-112900|Y
01|91578|1|1|Reference RGA# TAR-51566|Y
01|91578|1|2|5AX-201YA s/n: 5022|N
01|91585|1|1|Special 5C Round .286 collet|Y
01|91586|6|1|Customer to provide Balluff Chip P/N BIS-C-122-04/L|Y
01|91586|6|2|x 12 pieces to be installed.|Y
01|91598|1|1|SA-1-6|Y
01|91598|1|2|Sleeve for shrinking MST Stainless holders|Y
01|91598|2|1|SA-1-9|Y
01|91598|2|2|Sleeve for shrinking MST Stainless holders|Y
01|91598|3|1|SA-1-9.5|Y
01|91598|3|2|Sleeve for shrinking MST Stainless holders|Y
01|91598|4|1|SA-2-11|Y
01|91598|4|2|Sleeve for shrinking MST Stainless holders|Y
01|91598|5|1|SA-2-12|Y
01|91598|5|2|Sleeve for shrinking MST Stainless holders|Y
01|91598|6|1|SA-2-14|Y
01|91598|6|2|Sleeve for shrinking MST Stainless holders|Y
01|91598|7|1|SA-2-15|Y
01|91598|7|2|Sleeve for shrinking MST Stainless holders|Y
01|91598|8|1|SA-2-16|Y
01|91598|8|2|Sleeve for shrinking MST Stainless holders|Y
01|91609|1|1|T32136A06 - 90deg LT ER32 Main/Sub for Mori SL204|Y
01|91611|1|1|Formerly part number ATC/CAT40-FLANGE-L|Y
01|91614|1|1|Right Angle Face(Main)|Y
01|91614|1|2|for Okuma LT15M and LT300|Y
01|91614|3|1|Cross Drill/Straight Tool|Y
01|91614|3|2|Okuma LT15M and LT300|Y
01|91616|1|1|4-JAW HOWA#H01MA32 R-XXXX with A11J Adapter|Y
01|91616|1|2|quoted as NET pricingnon-returnable non-cancelable|Y
01|91616|1|3|ETA is after drawing approval|Y
01|91616|2|1|HOWA#: Soft Jaws for above Set of 4|Y
01|91616|2|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|91616|3|1|6-JAW HOWA#: H01MA32 R-XXXX with A11J Adapter|Y
01|91616|3|2|Quoted as NET pricing non-cancelable non-returnable|Y
01|91616|3|3|ETA is after drawing approval|Y
01|91616|4|1|HOWA#: Soft Jaws for above set of (6)|Y
01|91616|4|2|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|91620|1|1|H125A-0500A-4.625 Nose Diameter = 1.626Dia|Y
01|91620|1|2|Gage Length= 4.625|Y
01|91644|1|1|600MM table with Haas motor and cable set.|Y
01|91644|1|2|@@@ CORRECT P/N CNC-601YA-M @@@|Y
01|91644|2|1|INCLUDES HAAS SERVO MOTOR AND CABLES|Y
01|91644|2|2|@@ CORRECT P/N CNC-501YA-M @@|Y
01|91644|8|1|80MM SUBPLATE FOR TAILSTOCK TO CENTERLINE OF TABLE|Y
01|91647|4|1|KM20-3/4 KM20 Straight Collet/Sleeve 3/4  Anniversary|Y
01|91647|6|1|1/2 TO 6MM REDUCTION SLEEVE|Y
01|91647|7|1|1/2 TO 3/16 REDUCTION SLEEVEy|Y
01|91647|8|1|1/2 TO 4MM REDUCTION SLEEVE|Y
01|91647|9|1|1/2 TO 1/4 REDUCTION SLEEVE|Y
01|91647|10|1|1/2 TO 5/16 REDUCTION SLEEVE|Y
01|91647|11|1|HSK63A Hydraulic Chuck 10mm|Y
01|91647|12|1|HSK63A Hydraulic Chuck 12mm|Y
01|91647|15|1|RFID Chip BIS-C-122-11/L|Y
01|91647|16|1|HSK63A-HC16-90-IDI|Y
01|91666|1|1|HSK80F-SM0750-8.70  HSK80F Shell Mill Holder|Y
01|91666|1|2|3/4 X 8.70 Gage Length|Y
01|91666|1|3|Net price reflects a purchase order of 3 holders.|Y
01|91670|1|1|CAT40-DJ3-90A Boring Bar delivery for 1 pc 10-11 weeks|Y
01|91670|1|2|For more pcs delivery would be 14-15 weeks|Y
01|91676|2|1|BT50-UMTX200|Y
01|91676|3|1|BT50-TP200|Y
01|91677|1|1|Quoted at Net Price|Y
01|91680|3|1|We do not offer a dual contact version|Y
01|91680|4|1|We do not offer a dual contact version|Y
01|91693|6|1|NET PRICE|Y
01|91700|1|1|Prepared with SIGMA 5 motors. To also include USB drive|Y
01|91700|1|2|with CORRECT PARAMETERS and air lines when shipping.|Y
01|91721|1|1|5pcs Stock Remaining Bal ETA aprox 5-7 days|Y
01|91721|9|1|5pcs Stock remaining bal ETA 5-7 Days|Y
01|91731|6|1|Application Must Be Reviewed Before Order|Y
01|91731|7|1|Application Must Be Reviewed Prior to Order|Y
01|91731|9|1|Machine Make and Model Required for Positioning Block|Y
01|91769|1|1|HSK63A RAH ER20 L=140mm L1=71mm 360 Deg ADJ 1:1 Gear|Y
01|91769|1|2|ratio Max M=10Nm 2000RPM No coolant reversal of|Y
01|91769|1|3|direction Weight apprx 3kg Ref drwg#00053973|Y
01|91769|1|4|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|91769|2|1|HSK63A RAH ER20 L=140mm L1=71mm 360 Deg ADJ 1:1 Gear|Y
01|91769|2|2|ratio Max M=10Nm 2000RPM No coolant reversal of|Y
01|91769|2|3|direction Weight apprx 3kg Ref drwg#00053973|Y
01|91769|2|4|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|91799|1|1|w/ Blank Draw Nut|Y
01|91805|1|1|FACE VALUE OF CERTIFICATE = $175000.00|Y
01|91822|1|1|BRS-12.96|Y
01|91822|1|2|HSS Broach Reamer ST Shank 12.96mm|Y
01|91822|2|1|BRS-12.97|Y
01|91822|2|2|HSS Broach Reamer ST Shank 12.97mm|Y
01|91822|3|1|BRS-12.98|Y
01|91822|3|2|HSS Broach Reamer ST Shank 12.98mm|Y
01|91822|4|1|BRS-12.99|Y
01|91822|4|2|HSS Broach Reamer ST Shank 12.99mm|Y
01|91829|2|1|Installation includes: drive unit short bar fiber|Y
01|91829|2|2|optic cables communication cables bulk head cable|Y
01|91829|2|3|set external cable set parameter changes service|Y
01|91829|2|4|time and travel|Y
01|91830|2|1|Installation includes: drive unit short bar fiber|Y
01|91830|2|2|optic cables communication cables bulk head cable|Y
01|91830|2|3|set external cable set parameter changes service|Y
01|91830|2|4|time and travel|Y
01|91841|2|1|ITEM ALREADY SHIPPED TO CUSTOMER. SHIPPED 4/18 FOR|Y
01|91841|2|2|4/20 DELIVERY. ONLY NEED TO BILL|Y
01|91849|2|1|Bulkhead Cables - 40' length|Y
01|91849|3|1|External Cables - 16' length|Y
01|91858|1|1|Installation: AMP Bulkhead Cable External Cable|Y
01|91858|1|2|Communication Cable Fiber Optic Parameters Travel|Y
01|91858|1|3|Labor|Y
01|91858|1|4|** Special Pricing for 2 tables in 1 visit **|Y
01|91862|2|1|HH4CB-100-SEAL-KIT P&D TBA|Y
01|91863|1|1|With special faceplate(REF S/N 4576)|Y
01|91863|2|1|with special faceplate|Y
01|91863|3|1|with special faceplate|Y
01|91869|1|1|QUOTE INCLUDES CNC260 4TH AXIS AND REQUIRED CANBLES|Y
01|91883|1|1|w/ Special Face Plat 6P R/Joint Std. Base and Motor.|Y
01|91892|1|1|1x set of 2x tables|Y
01|91893|1|1|Includes: Drive unit short bar fiber optic cable|Y
01|91893|1|2|communications cable external/interface cables|Y
01|91893|1|3|travel labor and expenses|Y
01|91900|2|1|H037M10-A8 Adapter|Y
01|91900|5|1|H034M10-A8J|Y
01|91906|2|1|NCS-7.0  Reamer ST 7.0mm NC Sensor|Y
01|91906|4|1|NCS-9.0  Reamer ST 9.0mm NC Sensor|Y
01|91906|6|1|NCS-11.0  Reamer ST 11.0mm NC Sensor|Y
01|91906|9|1|NCS-14.0  Reamer ST 14.0mm NC Sensor|Y
01|91910|1|1|Please Note: C40RAM-ER25-180OTIC-65TP is non standard|Y
01|91910|1|2|stock. Once a purchase order is placed it cannot|Y
01|91910|1|3|be cancelled or returned.|Y
01|91918|1|1|Tooling Certificate #20850-1175-041218|Y
01|91926|1|1|Face Value $1250.00|Y
01|91960|1|1|HSK125A-C3/4-115 Milling Chuck|Y
01|91960|1|2|1-9 piece pricing|Y
01|91960|2|1|HSK125A-C3/4-115 Milling Chuck|Y
01|91960|2|2|10-19 pieces|Y
01|91963|1|1|w/ chip installation (Omron V600-D23P53)|Y
01|91963|3|1|w/ chip installation (Omron V600-D23P53)|Y
01|91963|5|1|HSK63A-C25-130|Y
01|91963|5|2|w/ chip installation (Omron V600-D23P53)|Y
01|91963|6|1|HSK63A-HC20-3.94-IDI 20mm Hydraulic Holder|Y
01|91963|6|2|w/ chip installation (Omron V600-D23P53)|Y
01|91963|7|1|w/ chip installation (Omron V600-D23P53)|Y
01|91971|1|1|Reference RGA# TAR-51565|Y
01|91971|1|2|5AX-220IIDA21FA-M s/n: 1155|N
01|91981|1|1|CAT40-DJ3-90A Boring Bardelivery for will be|Y
01|91981|1|2|14-15 weeks from ARO.Item is non returnable/cancellable|Y
01|91989|10|1|Delivery is from receipt of spindle drawing information|Y
01|92004|1|1|Ref:RGA#LVR-51700|Y
01|92004|1|2|MNL12-ER40Z sn#A0104|Y
01|92004|2|1|Bearings Seals O-rings Bearing Nut Collet Nut need|Y
01|92004|2|2|to replace.|Y
01|92004|2|3|Labor is included.|Y
01|92009|1|1|Ref:RGA#LVR-51725|Y
01|92009|1|2|MNL12-ER32Z sn#A0247|Y
01|92009|2|1|Bearings Seals O-Rings Collet Nuts Gears Bearing|Y
01|92009|2|2|Nuts need to replace.|Y
01|92009|2|3|Labor is included.|Y
01|92010|1|1|Price based on 10 pc order minimum|Y
01|92017|8|1|DIN MODIFY P/N: CAT40-SK10F-90U-IDU-DIN|Y
01|92017|9|1|DIN MODIFY P/N: CAT40-SK16F-90U-IDU-DIN|Y
01|92020|1|1|to hold 9/64|Y
01|92020|2|1|to hold 11/64|Y
01|92020|3|1|to hold 13/64|Y
01|92023|1|1|gage length of 3.02|Y
01|92026|1|1|NC5001-1500-2.00-DIN|Y
01|92026|2|1|*Installed on NC5001-1500-2.00 at L&N|Y
01|92026|2|2|**Required for coolant to exit out|Y
01|92026|3|1|**Mod Charge at NET price|Y
01|92027|6|1|2 systems are quoted above.System 1 (lines 1-3) or|Y
01|92027|6|2|System 2 (lines 4-5)|Y
01|92028|4|1|HSK63A-SZF6C-90 Bullseye|Y
01|92038|1|1|34-ZMAC70R-70V|Y
01|92038|2|1|34-ZMAC70-70AA|Y
01|92038|3|1|34-RAC70-85-C|Y
01|92061|1|1|External/Interface Cables included|Y
01|92061|1|2|Price are NET payable EXW Mundelein IL - USA|Y
01|92074|6|1|EXTERNAL POWER/FEEDBACK CABLE|Y
01|92074|9|1|80MM subplate for centerline of tailstock to table|Y
01|92074|11|1|INCLUDES DRIVE FIBRE OPTIC CABLES SERVO MOTOR|Y
01|92074|11|2|AMPLIFIER EXTERNAL CABLES TRAVEL INSTRIUCTION|Y
01|92074|11|3|LABOR|Y
01|92098|1|1|KM1.1/4-0.7550|Y
01|92098|1|2|Special KM 1.1/4 milling chuck collet on size 0.7550|Y
01|92098|2|1|KM1.1/4-0.7920|Y
01|92098|2|2|Special KM1.1/4 milling chuck collet on size 0.7920|Y
01|92098|3|1|KM1.1/4-0.9890|Y
01|92098|3|2|Special KM1.1/4 milling chuck collet on size 0.9890|Y
01|92098|4|1|KM1.1/4-1.005|Y
01|92098|4|2|Special KM1.1/4 milling chuck collet on size 1.005|Y
01|92098|5|1|KM2-1.255|Y
01|92098|5|2|Special KM2 milling chuck collet on size 1.255|Y
01|92098|6|1|KM2-1.265|Y
01|92098|6|2|Special KM2 milling chuck collet on size 1.265|Y
01|92100|4|1|Swing Box|Y
01|92100|5|1|Complimetary $1000.00 Tooling Certificate with purchase|Y
01|92106|3|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|92106|5|1|Installation includes:|Y
01|92106|5|2|iptic cables communication cables|Y
01|92106|5|3|parameter changes service|Y
01|92106|5|4|time and travel|Y
01|92132|1|1|4TH AXIS WITH FANUC MOTOR|Y
01|92132|2|1|CABLE SET PER AXIS|Y
01|92134|1|1|Custom flange/pin assembly from AACOA unrepairable head|Y
01|92134|1|2|to be installed onto this angle head at factory|Y
01|92134|1|3|*187556: Support plate for housing 109mm dia|Y
01|92134|1|4|Torque arm center distance A=80mm; pin 18mm dia;|Y
01|92140|2|1|THIS IS A 1 1/2 THROUGH HOLE WITH THROUGH COOLANT|Y
01|92140|2|2|YOU'LL NEED TO PURCHASE A BUSHING TO GET TO 1 1/4|Y
01|92149|10|1|Delivery is from receipt of spindle drawing information|Y
01|92165|1|1|Repair of customer's SF-START2-UNIT-200 unit.|Y
01|92165|1|2|Repair to be completed by Pedro Suarez|Y
01|92165|2|1|Transit time: 6 hrs (RT) x $60.00/hr = $360.00|Y
01|92165|2|2|Meal per day: $35.00/day x|Y
01|92166|1|1|4TH AXIS WITH FANUC MOTOR|Y
01|92166|2|1|CABLE SET PER AXIS|Y
01|92181|1|1|DELIVERY PENDING FROM JAPAN|Y
01|92185|1|1|Non standard stock item.No returns/non cancellable|Y
01|92189|1|1|Reference RGA# TAR-51638|Y
01|92189|1|2|CNCZ260LSA s/n: 6865C|N
01|92200|1|1|**Pricing at 12+pcs|Y
01|92200|3|1|Installed on H63A(80) holders at factory|Y
01|92200|4|1|Installed on H63A(80) holders at factory|Y
01|92202|3|1|Cable Set|Y
01|92214|4|1|Installation Includes: Drive amp bulkhead cable set|Y
01|92214|4|2|external cable set communication cable fiber optic|Y
01|92214|4|3|cable parameter changes travel and labor.|Y
01|92214|5|1|Complimentary $1000.00 Tooling Certificate w/purchase|Y
01|92216|6|1|EXTERNAL POWER/FEEDBACK CABLE|Y
01|92216|9|1|80MM subplate for centerline of tailstock to table|Y
01|92216|11|1|INCLUDES DRIVE FIBRE OPTIC CABLES SERVO MOTOR|Y
01|92216|11|2|AMPLIFIER EXTERNAL CABLES TRAVEL INSTRIUCTION|Y
01|92216|11|3|LABOR|Y
01|92217|6|1|EXTERNAL POWER/FEEDBACK CABLE|Y
01|92217|9|1|80MM subplate for centerline of tailstock to table|Y
01|92217|11|1|INCLUDES DRIVE FIBRE OPTIC CABLES SERVO MOTOR|Y
01|92217|11|2|AMPLIFIER EXTERNAL CABLES TRAVEL INSTRIUCTION|Y
01|92217|11|3|LABOR|Y
01|92234|1|1|CAT50-SF0375-8.40|Y
01|92242|2|1|Installation includes: drive unit short bar fiber|Y
01|92242|2|2|optic cables communication cables bulk head cable|Y
01|92242|2|3|set external cable set parameter changes service|Y
01|92242|2|4|time and travel|Y
01|92252|1|1|Please Note: These are from Lyndex-Nikken's used shelf.|Y
01|92252|1|2|They are in excellent condition. Discount reflects|Y
01|92252|1|3|non returnable tooling.|Y
01|92261|1|1|*Qty 1-9pcs|Y
01|92261|2|1|*Qty 10-24pcs|Y
01|92261|3|1|*Qty 25-49pcs|Y
01|92261|4|1|*Qty 50-99pcs|Y
01|92261|5|1|*Qty 100pcs|Y
01|92270|1|1|Ref:RGA#TOR-51771|Y
01|92270|1|2|C5005-1375|Y
01|92270|2|1|Need to clean and re-grease.|Y
01|92282|1|1|INCLUDING HAAS SERVO MOTOR AND CABLES|Y
01|92282|9|1|80 MM subplate for tailstock|Y
01|92288|1|1|12 pieces in stock|Y
01|92288|1|2|40 pieces ship 5-7 days|Y
01|92288|1|3|bal ETA 2 weeks|Y
01|92296|1|1|Ref:TAR-51652|Y
01|92296|1|2|Tilt axis brake does not work and has backlash.|Y
01|92297|1|1|4.00L 2.36L1 2.36D 3/4-16X11/16(2) G6.3 15000rpm TIR<.|Y
01|92297|2|1|1.75L 0.67L1 2.00D 5/16K 3/8-24S Bolt A3/8-24 3/4-|Y
01|92297|2|2|KEYSET TIR<.0002 run out|Y
01|92331|5|1|12 CHUCK FOR CNC-501|Y
01|92331|9|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|92340|1|1|NBT50-C1.1/4-105|Y
01|92340|2|1|NBT50-C1-105|Y
01|92340|3|1|NBT50-C3/4-105|Y
01|92340|4|1|NBT50-SF0500-9.00|Y
01|92340|5|1|NBT50-SF1000-7.00|Y
01|92340|6|1|NB5046-1500-10.00|Y
01|92340|7|1|NB5011-0500-4.00|Y
01|92340|8|1|NB5031-0500-7.00|Y
01|92340|9|1|NB5051-1000-9.00|Y
01|92340|10|1|NB5051-0750-9.00|Y
01|92340|11|1|NB5051-1000-8.00|Y
01|92340|12|1|NB5041-0750-7.00|Y
01|92360|5|1|Supplied with 11-NANUT|Y
01|92360|6|1|Supplied with 11-NANUT|Y
01|92360|7|1|Supplied with 11-NANUT|Y
01|92360|8|1|Supplied with 11-NANUT|Y
01|92378|1|1|Mimatic PN#140066 CAT40 ER16 AGH L=135mm/L1=71mm|Y
01|92378|1|2|no coolant;1:1 gear ratio; output reversal to input;|Y
01|92378|1|3|max M=10Nm (2000RPM) M=1Nm (12000RPM) weight approx|Y
01|92378|1|4|3.5kg ref drawing#00054037|Y
01|92378|1|5|Quoted as NET pricing non-returnablenon-cancelable|Y
01|92378|2|1|2 PC pricing|Y
01|92378|2|2|Mimatic PN#140066 CAT40 ER16 AGH L=135mm/L1=71mm|Y
01|92378|2|3|no coolant;1:1 gear ratio; output reversal to input;|Y
01|92378|2|4|max M=10Nm (2000RPM) M=1Nm (12000RPM) weight approx|Y
01|92378|2|5|3.5kg ref drawing#00054037|Y
01|92378|2|6|Quoted as NET pricing non-returnablenon-cancelable|Y
01|92381|1|1|Mimatic PN#140066 CAT40 ER16 AGH L=135mm/L1=71mm|Y
01|92381|1|2|no coolant;1:1 gear ratio; output reversal to input;|Y
01|92381|1|3|max M=10Nm (2000RPM) M=1Nm (12000RPM) weight approx|Y
01|92381|1|4|3.5kg ref drawing#00054037|Y
01|92381|1|5|Quoted as NET pricing non-returnablenon-cancelable|Y
01|92381|2|1|2 PC pricing|Y
01|92381|2|2|Mimatic PN#140066 CAT40 ER16 AGH L=135mm/L1=71mm|Y
01|92381|2|3|no coolant;1:1 gear ratio; output reversal to input;|Y
01|92381|2|4|max M=10Nm (2000RPM) M=1Nm (12000RPM) weight approx|Y
01|92381|2|5|3.5kg ref drawing#00054037|Y
01|92381|2|6|Quoted as NET pricing non-returnablenon-cancelable|Y
01|92433|1|1|HSK25E-SK6-45P|Y
01|92433|1|2|COLLET RANGE .027-.230|Y
01|92433|1|3|50000 RPM|Y
01|92433|2|1|HSK25E-SK10-55P|Y
01|92433|2|2|COLLET RANGE .060-.390|Y
01|92433|2|3|50000 RPM|Y
01|92438|1|1|CAT40-SF0187-6.30|Y
01|92439|1|1|HSK100A-SF25EX-150B|Y
01|92439|1|2|HSK100A X-Treme Shrink Fit 25mm|Y
01|92439|3|1|HSK100A-SF25EXS-130B|Y
01|92439|3|2|HSK100A X-Treme Shrink Fit 25mm|Y
01|92441|1|1|Reference RGA# TAR-51719|Y
01|92441|1|2|5AX-200II s/n: 1555|N
01|92455|1|1|Includes Haas Motor & Cables|Y
01|92467|1|1|HSK63A(80)-SF0375-3.375-ID|Y
01|92467|1|2|HSK63(80) Hybrid 3/8 Shrink Fit holder w/ 3.375 gl|Y
01|92467|1|3|RFID Chip Hole only.  Etched: UNIV#5204|Y
01|92467|3|1|CAT50-SF1000-5.00-ID|Y
01|92467|3|2|CAT50 1 Shrink Fit holder w/ 5.00 gl|Y
01|92467|3|3|RFID Chip Hole only. Etched: UNIV#5155|Y
01|92479|9|1|for Hardinge GX1000 VMC|Y
01|92479|9|2|*delivery is from receipt of spindle drawing info|Y
01|92479|9|3|**quoted at NET price|Y
01|92490|1|1|16C hard smooth collet with counterbore in the face|Y
01|92490|1|2|CB diameter of .980 and a depth of .250. Thru hole can|Y
01|92490|1|3|be from .100-.500. Special|Y
01|92495|2|1|This modification is given in terms of NET price.|Y
01|92495|2|2|No further discount is to be taken away from this.|Y
01|92497|1|1|This part number replaces CAT40-SZF16-120U|Y
01|92523|2|1|Machine: Mori Seiki NH4000 DCG|Y
01|92523|2|2|NET PRICE|Y
01|92523|2|3|Lyndex-Nikken can make the position block upon receipt|Y
01|92523|2|4|of machine spindle information|Y
01|92545|1|1|Original unit sent in for evaluation is unrepairable.|Y
01|92545|1|2|Too much rust and fine dust penetrating the internal|Y
01|92545|1|3|components.|Y
01|92545|1|4|Reference RGA# CUR-51718|Y
01|92554|3|1|Includes travel labor expenses|Y
01|92558|1|1|BT50-SCA40-90  40mm Stub Mill Holder|Y
01|92558|2|1|CAT50-SCA38.1-135U Stub Mill Holder|Y
01|92566|3|1|Lyndex-Nikken to make position block|Y
01|92566|3|2|Delivery is from receipt of spindle drawing info|Y
01|92566|3|3|NET Price|Y
01|92570|1|1|Ref:RGA#LVR-51767|Y
01|92570|1|2|MNL12-ER11(X)-SUB-SP sn#87119-01|Y
01|92570|1|3|Send in for evaluation.|Y
01|92570|2|1|Replace all bearings seals and O-rings.|Y
01|92570|2|2|Replace spindle.|Y
01|92570|2|3|Labor is included.|Y
01|92572|13|1|Retention Knob Special $10.00 net each with the|Y
01|92572|13|2|purchase of the matching taper holder.|Y
01|92580|1|1|CHUCK FOR MAIN AND SUB SPINDLE.|Y
01|92580|1|2|CHUCK IS COMPATIBLE WITH ROYAL COLLETTS.|Y
01|92580|1|3|CHUCKS ARE NOT DEAD LENGTH|Y
01|92580|2|1|ADAPTER FOR A5 SUB SPINDLE.|Y
01|92580|3|1|THREAD ADAPTER MODIFICATION FOR MORI DRAWTUBE.|Y
01|92580|3|2|DRAWINGS WILL BE REQUIRED.|Y
01|92580|3|3|THIS STEP CAN BE DONE BY THE CUSTOMER.|Y
01|92586|8|1|EXTERNAL CABLE SET FOR ADDITIONAL AXIS|Y
01|92586|10|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|92586|10|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|92586|10|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|92594|2|1|Swing Box|Y
01|92594|3|1|Direct Mount Fanuc Power Cable lenght 10ft.|Y
01|92594|4|1|Direct Mount Fanuc Feedback Cable lenght 10ft.|Y
01|92594|5|1|Installation of both tables swing box cables|Y
01|92594|5|2|in Vertex facilities San Jose Costa Rica.|Y
01|92599|2|1|Measuring range: diameter max. 400 mm (radius 200 mm)|Y
01|92599|2|2|Height max. 600 mm|Y
01|92599|2|3|Axes resolution: X=.001mm Z=.001mm|Y
01|92609|1|1|NBT50 1/2diameter shell mill in 1.88 or 2 length|Y
01|92631|1|1|STATIC QUAD 1 HOLDER. POSITION 1&3|Y
01|92631|2|1|ER25 DUAL LIVE HOLDER POSITION 2|Y
01|92631|3|1|OFFSET BORING BAR HODLER|Y
01|92631|3|2|POSITION 5 6 7 11 AND 12|Y
01|92631|4|1|32MM BORING BAR HOLDER 3 PACK. POSITION 8|Y
01|92631|4|2|THRU COOLANT MODIFICATION|Y
01|92631|5|1|1 1/4 DUAL BORING BAR HOLDER.|Y
01|92631|5|2|THRU COOLANT PLUMBING REQUIRED.|Y
01|92631|6|1|32MM THREE PACK BORING HOLDER POSITION 8 THRU COOLANT|Y
01|92631|6|2|MODIFICATION|Y
01|92653|5|1|We cannot offer this tool with coolant ports.|Y
01|92653|7|1|H63A-SF14-120  HSK63A Shrink Fit 14mm X 120mm Gage|Y
01|92653|15|1|RFID Chip BIS-C-122-11/L|Y
01|92664|5|1|We cannot offer this tool with coolant ports.|Y
01|92664|7|1|H63A-SF14-120  HSK63A Shrink Fit 14mm X 120mm Gage|Y
01|92664|15|1|RFID Chip BIS-C-122-11/L|Y
01|92670|1|1|CNC803TFA-M 800MM ROTARY TOP MOUNT MOTOR FANUC|Y
01|92670|2|1|CABLES PER AXIS|Y
01|92689|1|1|Okuma LT15 and LT300 (old machines)|Y
01|92722|1|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|92730|1|1|Discount reflects a purchase order of 1~2 speeders.|Y
01|92730|2|1|Discount reflects a purchase order of 3~4 speeders.|Y
01|92732|3|1|YA Model same price|Y
01|92732|3|2|HAAS to supply SERVO motor|Y
01|92732|3|3|@@@@@@ MOTOR MODEL REQUIRED 93-1924@@@@@@@|Y
01|92732|3|4|MOTOR GEAR NEEDED FROM NIKKEN 4-6 WEEKS|Y
01|92742|14|1|use for SK10 and SK16|Y
01|92744|1|1|10pcs STOCK for immediate ship. Balance ETA aprox|Y
01|92744|1|2|13 weeks after receipt of order.|Y
01|92744|2|1|10pcs STOCK for immediate ship. Balance ETA aprox|Y
01|92744|2|2|13 weeks after receipt of order.|Y
01|92746|2|1|Includes trvel labor expenses|Y
01|92748|9|1|*Direct chucking 3/4|Y
01|92762|2|1|Coolant Nut|Y
01|92762|3|1|Standard Nut|Y
01|92776|2|1|This item has been discontinued. Please use item above.|Y
01|92793|1|1|Special net price reflects non returnable tooling.|Y
01|92799|1|1|Reference RGA# TOR-51758|Y
01|92799|1|2|Repair of customer's FP-2|Y
01|92799|3|1|Tool must be recalibrated once the ceramic button|Y
01|92799|3|2|is replaced.|Y
01|92806|2|1|External Power/Feedback Cables (2 Axes)|Y
01|92806|3|1|Riser Plate for 9 3/8 Height at Center Platter|Y
01|92808|1|1|Non-Returnable Non-cancelable|Y
01|92808|2|1|Non-Returnable Non-cancelable|Y
01|92808|3|1|Non-Returnable Non-cancelable|Y
01|92815|4|1|*Can sub for the std NT10-040|Y
01|92815|4|2|Slotted used for non-coolant app or coolant-along flute|Y
01|92833|1|1|Net Price quoted.|Y
01|92833|2|1|Net Price quoted.|Y
01|92835|2|1|Installation includes: drive unit short bar fiber|Y
01|92835|2|2|optic cables communication cables bulk head cable|Y
01|92835|2|3|set external cable set parameter changes service|Y
01|92835|2|4|time and travel|Y
01|92874|1|1|Includes: 200MM tilt rotary table with Okuma OSP3|Y
01|92874|1|2|motors BL-ME24J-50SN with pneumatic brake system.|Y
01|92874|6|1|4+1 Rotary Joint rated for 1000psi maximum pressure.|Y
01|92875|1|1|Item is a non standard stock item.Once it is ordered it|Y
01|92875|1|2|is non-cancelable or returnable|Y
01|92876|1|1|Repair of CNCZ105A21 + AA21 Controller|Y
01|92876|1|2|Customer getting 4001 Alarm on Controller|Y
01|92876|1|3|RGA # TAR-51782|Y
01|92881|9|1|Presetter Installation & Training (Travel Included)|Y
01|92883|7|1|*Alternative for std 3/16|Y
01|92887|1|1|Net price quoted is based upon a order of 3 or more.|Y
01|92896|1|1|Repair of CNCZ105A21 + AA21 Controller|Y
01|92896|1|2|Customer getting 4001 Alarm on Controller|Y
01|92896|1|3|RGA # TAR-51782|Y
01|92897|1|1|HSK125A-0625-9.14|Y
01|92897|1|2|5/8 End Mill Holder with 9.14 gage length|Y
01|92897|2|1|HSK125A-0750-9.14|Y
01|92897|2|2|3/4 End Mill Holder with 9.14 gage length|Y
01|92906|1|1|HSK40A-HC6-95.25 Hydraulic Holder|Y
01|92906|1|2|OAL can be standard|Y
01|92906|2|1|HSK40A-HC8-95.25 Hydraulic Holder|Y
01|92906|2|2|OAL can be standard|Y
01|92906|3|1|HSK40A-HC10-95.25|Y
01|92906|3|2|OAL can be standard|Y
01|92906|4|1|HSK40A-HC12-95.25|Y
01|92906|4|2|OAL can be standard|Y
01|92906|5|1|HSK40A-HC20-95.25 OD Must=50MM Hydraulic Chuck|Y
01|92906|5|2|OAL not to exceed 95.25mm|Y
01|92906|6|1|HSK40A-HC0250-3.75 3/8 Hydraulic Chuck|Y
01|92906|6|2|OAL not to exceed 3.75|Y
01|92906|7|1|HSK40A-HC0500-3.75 1/2IDOD=50mm Hydraulic Chuck|Y
01|92906|7|2|OAL not to exceed 3.75|Y
01|92906|8|1|HSK40A-HC0750-3.75 3/4 Hydraulic Chuck|Y
01|92906|10|1|HSK40C-HC6-3.75 6mm Hydraulic Chuck|Y
01|92906|10|2|OAL standard length|Y
01|92914|6|1|Net price quoted.|Y
01|92914|9|1|Net price quoted.|Y
01|92917|1|1|H40E-SF0375-3.15CP HSK40E 3/8X 3.15 Gage Length|Y
01|92917|1|2|Shrink Fit Holder with coolant port.|Y
01|92917|1|3|Net price based upon a purchase order of 50 holders.|Y
01|92918|31|1|Please Note: Net price reflects purchase of matching|Y
01|92918|31|2|taper for each retention knob.|Y
01|92922|1|1|CAT40;ER16; AGH; Reversal of Rotation; 1:1.5 Gear Ratio|Y
01|92922|4|1|CAT40;ER16; AGH; Reversal of Rotation; 1:1.5 Gear Ratio|Y
01|92927|3|1|Installation inlcdes: Drive unitfiber optic cable|Y
01|92927|3|2|communications cablebulkhead cablesexternal cables|Y
01|92927|3|3|parameter changes service time and travel.|Y
01|92927|3|4|NOTE: FANUC ADDITIONAL AXIS SOFTWARE OPTION NOT|Y
01|92927|3|5|INCLUDED.|Y
01|92930|4|1|Installation for the F960B includes: Drive unit short|Y
01|92930|4|2|barfiber optic cablecommunications cablebulkhead|Y
01|92930|4|3|cablesparameter changes service time and travel.|Y
01|92930|4|4|NOTE: FANUC ADDTIONAL AXIS SOFTWARE OPTION NOT|Y
01|92930|4|5|INCLUDED.|Y
01|92951|7|1|Please Note: Lyndex-Nikken has one in stock. If end|Y
01|92951|7|2|user needs 2 more I will need to request r&d from|Y
01|92951|7|3|my purchasing department.|Y
01|92956|9|1|1 $5 pull stud for every 1 toolholder purchased|Y
01|92960|1|1|1-4 pcs 1-2 Weeks|Y
01|92960|1|2|If additional pieces are needed 9-10 weeks for mfg.|Y
01|92974|1|1|CAT50 EMH 5/8 w 15.00 gage length and special|Y
01|92974|1|2|D1 dimension = 1.75 (vs. 2.75 standard)|Y
01|92981|1|1|HFO TO SUPPLY MOTORS AND CABLE SETS|Y
01|92996|2|1|INCLUDES POWER/FEEDBACK CABLES|Y
01|92996|2|2|@@@@@  CNC 202LOSP4-M  @@@@@@@@   CORRECT PART NUMBER|Y
01|92996|5|1|$ 1000.00 LYNDEX NIKKEN TOOL CERTIFICATE AT LIST|Y
01|93006|1|1|GKN requirments: Inspection certification on each|Y
01|93006|1|2|adapter is required. Unfortunately we cannot offer|Y
01|93006|1|3|certification on NMTB50 tooling.|Y
01|93009|1|1|9 in stock|Y
01|93009|1|2|3 ship 3-5 days|Y
01|93009|1|3|8 ETA 6/11|Y
01|93010|1|1|Reference RGA# TAR-51346|Y
01|93010|1|2|5AX-200II s/n: 2067|N
01|93013|1|1|special item no cancelable no refundable after PO|Y
01|93013|2|1|special item no cancelable no refundable after PO|Y
01|93013|3|1|special item no cancelable no refundable after PO|Y
01|93013|4|1|special item no cancelable no refundable after PO|Y
01|93013|5|1|special item no cancelable no refundable after PO|Y
01|93013|6|1|special item no cancelable no refundable after PO|Y
01|93017|1|1|MUST BE HIGH SPEED COOLANT NUT VERSION|Y
01|93029|1|1|200MM rotary table with Alpha 8/3000is motor.|Y
01|93029|2|1|Includes: Bulkhead cablesexternal cables parameter|Y
01|93029|2|2|changes service time and travel.|Y
01|93035|6|1|No Quote item is not available in this size/material|Y
01|93035|7|1|No quote item is not available in this size/material|Y
01|93041|1|1|Repair of customer's OK109-15000 s/n: AL193|Y
01|93041|1|2|Reference RGA# LVR-51781|Y
01|93041|2|1|Collet nuts bearings seals and o-rings must all be|Y
01|93041|2|2|replaced.|Y
01|93041|2|3|Labor is included in repair cost.|Y
01|93043|1|1|BMT85 ER50X External Nut Live Straight Tool|Y
01|93043|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|93045|1|1|Repair of customer's MNL12-ER32Z-MS s/n: A0693 (T32216)|Y
01|93045|1|2|Reference RGA# LVR-51790|Y
01|93045|2|1|Spindle collet nut bearings bearing nuts lock|Y
01|93045|2|2|washers seals and o-rings must all be replaced.|Y
01|93045|2|3|***We will try to clean up the original spindle and|Y
01|93045|2|4|re-use; however we will not be able to tell if it|Y
01|93045|2|5|will be re-usable until assembled and test ran.|Y
01|93045|2|6|If we are able to re-use the price will be $1785.33|Y
01|93045|4|1|Discount quoted is for core trade-in.|Y
01|93047|1|1|BMT85 ER50X External Nut Live Straight Tool|Y
01|93047|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|93049|1|1|Price increase due to increased cost of the special|Y
01|93049|1|2|discontinued Yaskawa motors|Y
01|93049|1|3|1 table + junction box/cable/center divider arriving|Y
01|93049|1|4|6/11|Y
01|93049|1|5|1 table arriving end of June|Y
01|93097|1|1|HSK125A-C3/4-165-IDU 3/4 Milling Chuck w/ID Chip Hole|Y
01|93097|1|2|1-9 piece pricing|Y
01|93097|2|1|HSK125A-C3/4-165-IDU 3/4 Milling Chuck w/ID Chip Hole|Y
01|93097|2|2|10-19 pieces|Y
01|93097|4|1|HSK125A-C1-165-IDU 1 Milling Chuck w/ID Chip Hole|Y
01|93097|4|2|1-9 piece pricing|Y
01|93097|5|1|HSK125A-C1-165-IDU 1 Milling Chuck w/ID Chip Hole|Y
01|93097|5|2|10-19 pieces|Y
01|93097|7|1|HSK125A-C2-165-IDU 2 Milling Chuck w/ID Chip Hole|Y
01|93097|7|2|1-9 piece pricing|Y
01|93097|8|1|HSK125A-C2-165-IDU 2 Milling Chuck w/ID Chip Hole|Y
01|93097|8|2|10-19 pieces|Y
01|93099|1|1|Machine Data Sheets Required Prior to Order|Y
01|93099|1|2|Ladder/Parameter Changes May be Required for Operation|Y
01|93099|1|3|Workholding Not Included in this Quotation|Y
01|93099|4|1|External Power & Feedback Cable (4th Axis)|Y
01|93100|6|1|External Power & Feedback Cables (2 Axes)|Y
01|93102|1|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|93102|1|2|External Cables Service Time & Travel.|Y
01|93102|2|1|Includes Manual Tailstock 8 Scroll Chuck and CAT40|Y
01|93102|2|2|ER High Torque Starter Package 12 Holders per attached|Y
01|93102|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|93102|3|2|External Cables Service Time & Travel.|Y
01|93102|4|1|Includes Manual Tailstock 10 Scroll Chuck and CAT40|Y
01|93102|4|2|ER High Torque Starter Package 12 Holders per attached|Y
01|93102|5|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|93102|5|2|External Cables Service Time & Travel.|Y
01|93102|6|1|Includes Manual Tailstock 12 Scroll Chuck and CAT40|Y
01|93102|6|2|ER High Torque Starter Package 12 Holders per attached|Y
01|93106|2|1|Includes:Drive unit bulkhead cables external cables|Y
01|93106|2|2|parameter changes service time and travel.|Y
01|93109|1|1|16-ZMAC32-55  ZMAC Boring Head|Y
01|93133|1|1|Discount reflects a purchase order up to 100 collets.|Y
01|93133|2|1|Discount reflects a purchase order of 101+ collets.|Y
01|93133|3|1|Discount reflects a purchase order up to 100 collets.|Y
01|93133|4|1|Discount reflects a purchase order of 101+ collets.|Y
01|93134|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|93134|2|1|uoted as NET pricing Non-returnable Non-cancelable|Y
01|93137|1|1|SF 480V CONVERSION KIT|Y
01|93137|1|2|KIT INCLUDES: MOTHER BOARD FILTER CARD MAIN SWITCH.|Y
01|93138|7|1|1 pc in stock remainder ETA week of 6-18-18|Y
01|93138|14|1|ETA week of 5-14-18|Y
01|93138|25|1|ETA 1-2 weeks for delivery|Y
01|93154|2|1|H037M10-A8 Adapter|Y
01|93154|5|1|H034M10-A8J|Y
01|93161|13|1|Non-returnable-Non-cancelable|Y
01|93177|3|1|Includes: drive amp bulk head cable set external|Y
01|93177|3|2|cable set fiber optic cable communication cable|Y
01|93177|3|3|travel and labor for installation.|Y
01|93177|3|4|BASED UP PERFORMING ALL 3 INSTALLATION AT SAME TIME|Y
01|93188|1|1|5C closer ONLY|Y
01|93188|2|1|Complete 5C assembly|Y
01|93197|4|1|Power/Feedback Cable for 4th Axis|Y
01|93197|6|1|Engineering: Fixture Design Programming Turn-Key Cost|Y
01|93197|7|1|Tombstone Fixturing for Hol Mac Caliper Part|Y
01|93197|8|1|Haas 3rd Party Rotary Table Package Required Prior to|Y
01|93197|8|2|Installation of the Rotary Table|Y
01|93204|1|1|B5002-2500-4.00|Y
01|93226|1|1|QUOTED AS NET PRICINGNon-returnableNon-cancelable|Y
01|93226|4|1|QUOTED AS NET PRICINGNon-returnableNon-cancelable|Y
01|93236|2|1|If ordered by 5/15 ETA 5/25|Y
01|93255|3|1|9C32-R2: Cage|Y
01|93268|2|1|Delivery is 4-8 weeks|Y
01|93272|2|1|CNCB450 VERTICAL WEIGHT CAPACITY IS 350KG (771LBS)|Y
01|93272|2|2|CNCB450 FACEPLATE DIA 450MM (17.71IN)|Y
01|93272|2|3|CNCB450 CENTER HEIGHT 280MM (11.02IN)|Y
01|93272|3|1|CNCB450 CAN USE AIR/HYDRAULIC UNIT|Y
01|93272|8|1|CNC501 VERTICAL WEIGHT CAPACITY 400KG (881LBS)|Y
01|93272|8|2|CNC501 FACEPLATE DIA 500MM (19.68IN)|Y
01|93272|8|3|CNC501 CENTER HEIGHT 310MM (12.20IN)|Y
01|93272|9|1|ROTARIES OVER 500MM REQUIRE HYDRAULIC BOOSTER|Y
01|93272|9|2|DUE TO THE VOLUME REQUIRED TO PROPERLY FUNCTION.|Y
01|93272|15|1|CNCB630 VERTICAL WEIGHT CAPACITY IS 800KG (1763LBS)|Y
01|93272|15|2|CNCB630 FACEPLATE DIA 630MM (24.80IN)|Y
01|93272|15|3|CNCB630 CENTER HEIGHT 380MM (14.96IN)|Y
01|93272|16|1|ROTARIES OVER 500MM REQUIRE HYDRAULIC BOOSTER|Y
01|93272|16|2|DUE TO THE VOLUME REQUIRED TO PROPERLY FUNCTION|Y
01|93273|1|1|N50F1-40-3.00|Y
01|93273|2|1|N50F1-60-3.00|Y
01|93275|1|1|Reference RGA# TAR-51673|Y
01|93275|1|2|Repair of TAT-250 s/n: 2310|Y
01|93279|1|1|HSK63A-ER16-5.00-IDI >> RFID Chip BIS M122-02/A|Y
01|93279|1|2|installed. Holders to be laser marked with Pratt|Y
01|93279|1|3|& Whitney #PC457340REV-  and label marked on|Y
01|93279|1|4|on individual boxes with #PC457340REV- .|Y
01|93279|1|5|Quoted at Net price.|Y
01|93279|3|1|Service please inspect laser mark and RFID chips.|Y
01|93279|3|2|Shipping department to inspect labels for correct|Y
01|93279|3|3|Pratt & Whitney part number PC457340REV-|Y
01|93281|31|1|*1 shank (capacity #0-9/16 - system #1)|Y
01|93281|32|1|*1 shank (capacity 5/16-7/8 - system #2)|Y
01|93281|33|1|**1.1/4 shank (capacity 13/16-1.3/8 - system #3)|Y
01|93281|35|1|Collet Set: 5/16-7/8  - System #2|Y
01|93299|1|1|Ref:TOR-51706|Y
01|93299|1|2|PF-2|Y
01|93299|1|3|Send in for evaluation.|Y
01|93329|5|1|3.15 gage length|Y
01|93337|4|1|16 3 jaw steel body chuck with 6.5 thru hole|Y
01|93337|4|2|1634-2000-6.5 with adapter plate|Y
01|93337|5|1|8 3 jaw steel body chuck 0825300|Y
01|93337|5|2|Self-Centering Universal Steel Body SETRITE Chucks|Y
01|93362|1|1|TCE-A3259/0 Power Cable|Y
01|93366|1|1|C5026-1250A-8.00|Y
01|93366|1|2|CAT50 1.1/4 Aerospace End Mill Holder w/ 8.00 g.l.|Y
01|93366|2|1|C5006-1250A-4.00|Y
01|93366|2|2|CAT50 1.1/4 Aerospace End Mill holder w/ 4.00 g.l.|Y
01|93366|3|1|C5016-1250A-6.00|Y
01|93366|3|2|CAT50 1.1/4 Aerospace End Mill holder w/ 6.00 g.l.|Y
01|93370|1|1|**42% Offer valid through the end of May**|Y
01|93370|1|2|SN:5626|Y
01|93374|1|1|GKN requirments: Inspection certification on each|Y
01|93374|1|2|adapter is required. Unfortunately we cannot offer|Y
01|93374|1|3|certification on NMTB50 tooling.|Y
01|93374|1|4|GKN print.|Y
01|93386|6|1|ETA week of 5/21/18|Y
01|93396|2|1|Replaces the 100TG-PULL|Y
01|93401|1|1|THIS TABLE IS A DEMO TABLE|Y
01|93401|1|3|WARRANTY INCLUDED. PROPER FITH TO MACHINE/CLEARANCE|Y
01|93401|1|5|NEED TO BE CONFIRMED. 4 + 1 INTERFACE|Y
01|93414|1|1|Reference RGA# TAR-51622|Y
01|93414|1|2|5AX-130 s/n: 4930|N
01|93425|1|1|Reference RGA# TAR-51775|Y
01|93425|1|2|CNCZ180 s/n: 12215|Y
01|93434|1|1|HSK63A-ER16-3.00B Pre-Balanced & Balanceable 2.5 to|Y
01|93434|1|2|28000 RPM|Y
01|93434|2|1|HSK63A-ER16-5.00B Pre-Balanced & Balanceable 2.5 to|Y
01|93434|2|2|28000 RPM|Y
01|93434|4|1|HSK63A-ER25-3.00B Pre-Balanced & Balanceable 2.5 to|Y
01|93434|4|2|28000 RPM|Y
01|93434|5|1|HSK63A-ER25-5.00B Pre-Balanced & Balanceable 2.5 to|Y
01|93434|5|2|28000 RPM|Y
01|93434|7|1|HSK63A-ER32-4.00B Pre-Balanced & Balanceable 2.5 to|Y
01|93434|7|2|28000 RPM|Y
01|93434|8|1|HSK63A-ER32-6.00B Pre-Balanced & Balanceable 2.5 to|Y
01|93434|8|2|28000 RPM|Y
01|93446|1|1|RESOLUTION HIGH ENOUGH FOR TOOLS SMALLER THAN 1/8|Y
01|93446|1|2|30X MAGNIFICATION|Y
01|93446|1|3|BASE AND COLUMN MADE OF GROUND NATURAL GRANITE|Y
01|93446|1|4|MEASURING RESOLUTION 1uM (.000039)|Y
01|93446|3|1|INTEGRATED PRINTING FUNCTION FOR OFFEST LABLES.|Y
01|93462|1|1|P/N 167480. VDI50 DIN 10889.  CAT 40 OUTPUT 90 DEG|Y
01|93462|1|2|Z TOOL. INT/EXT COOLANT OPTION UP TO 1015 PSI.|Y
01|93462|1|3|DIRECTION OF ROTATION REVERSAL MAX 3000 RPM.|Y
01|93462|2|1|SAME DESCRIPTION AS ITEM 1. QUANTITY DISCOUNT SHOWN|Y
01|93462|3|1|SAME DESCRIPTION AS ITEM 1. QUANTITY DISCOUNT SHOWN.|Y
01|93464|1|1|Reference RGA# TOR-51815|Y
01|93464|1|2|Tool# 1 CAT40-NPU13-105U-IDU|Y
01|93464|1|3|Drill body was separated from holder.|Y
01|93464|1|4|Needs to be re-attached all parts seem to be in|Y
01|93464|1|5|re-usable condition.|Y
01|93464|2|1|Labor to clean up and re-assemble Tool #1.|Y
01|93464|3|1|Tool #2: CAT40-NPU13-105U|Y
01|93464|3|2|Drill body is seized missing retention bolt and|Y
01|93464|3|3|lead screw is also seized up.  We recommend replacing|Y
01|93464|3|4|with new unit.|Y
01|93464|4|1|Tool #3: CAT40-NPU13-105U|Y
01|93464|4|2|Drill body seized jaws missing retention bolt loose|Y
01|93464|4|3|and lead screw is damaged.|Y
01|93464|4|4|We recommend replacing with new unit.|Y
01|93464|5|1|Tool #4: CAT40-NPU8-110U|Y
01|93464|5|2|Drill body separated from itself and threads are|Y
01|93464|5|3|damaged. We recommend replacing with new unit.|Y
01|93464|6|1|Tool #5: CAT40-NPU8-110U|Y
01|93464|6|2|Drill body seized lead screw damaged and seized from|Y
01|93464|6|3|crash. We recommend replacing with new unit.|Y
01|93464|7|1|Tool #6: CAT40-NPU8-110U|Y
01|93464|7|2|Excessive runout in drill body. Would need to replace|Y
01|93464|7|3|entire drill body.  Recommend replacing with new unit.|Y
01|93464|8|1|Tool #7: CAT40-NPU8-110U|Y
01|93464|8|2|Please note cost of repairing unit is more than half|Y
01|93464|8|3|the cost to replace the unit.  We also recommend|Y
01|93464|8|4|replacing with new.|Y
01|93464|9|1|Jaws are damaged must be replaced.|Y
01|93464|10|1|Labor to repair Tool #7|Y
01|93470|1|1|Machine Make/Model & Spindle Information Needed Prior|Y
01|93470|1|2|To Order. Drawscrew replacement may be required.|Y
01|93493|1|1|**NET PRICE|Y
01|93493|3|1|5/8 Straight Shank Diameter|Y
01|93511|4|1|SKG16-10HGA|Y
01|93517|4|1|Wrenches are to be included|Y
01|93520|1|1|Need Mazak E-bill for motor/wire harness specification|Y
01|93520|1|2|Mazak needs to give Lyndex permission in order for|Y
01|93520|1|3|Lyndex to process the order|Y
01|93522|1|1|Nikken BT30-HTS1500-152B  Air Turbine Spindle Tool|Y
01|93528|1|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|93533|1|1|1 table only including sheet metal junction box|Y
01|93533|1|2|junction box cable|Y
01|93535|3|1|for Okuma M560|Y
01|93535|3|2|*delivery is from receipt of spindle drawing info|Y
01|93535|3|3|*quoted at Net price|Y
01|93536|3|1|Junction Box|Y
01|93537|1|1|FOR 5AX-130OSP3-M|Y
01|93539|2|1|External Power/Feedback Cables (2 Axes)|Y
01|93539|3|1|Riser Plate for 9 3/8 Height at Center Platter|Y
01|93540|2|1|External Power/Feedback Cables (2 Axes)|Y
01|93540|3|1|Riser Plate for 9 3/8 Height at Center Platter|Y
01|93541|1|1|Factory Order Tool; Non-Cancellable; Non-Returnable|Y
01|93541|3|1|BMT85-ER50Z for Hwacheon Hi-Tech 850|Y
01|93541|3|2|centerline measurement 80mm|Y
01|93543|11|1|4TH INREFACE INCLUDES SERVO AMPCONNECTORS MACHINE|Y
01|93543|11|2|CABLES FIBRE OPTICS TRAVEL LABOR TRAINING|Y
01|93543|11|3|QUOTE BASED UPON 4 installs|Y
01|93543|13|1|$ 1000 TOOL CERT PER MACH AT FACE VALUE|Y
01|93549|1|1|*Blank Draw Nut*|Y
01|93554|1|1|H63A(80)-SM1500-2.25-ID|Y
01|93554|1|2|HSK63A(80) Hybrid 1.1/2 Shell Mill holder w/ 2.25 g.l.|Y
01|93554|1|3|RFID Chip Hole only. Etched: UNIV#5278|Y
01|93554|2|1|Item same as above   quantity break|Y
01|93554|3|1|H63A(80)-SF0500-3.375-ID|Y
01|93554|3|2|HSK63(80) Hybrid 1/2 Shrink Fit holder w/ 3.375 gl|Y
01|93554|3|3|RFID Chip Hole only.  Etched: UNIV#????|Y
01|93554|4|1|same as above quantity break|Y
01|93574|2|1|Installed on BT30-TB40-150|Y
01|93578|4|1|TABLE REQUIRES HYD. CLAMPING. AIR/HYD BOOSTER INCLUDED|Y
01|93578|10|1|TABLE REQUIRES EITHER AIR OR HYD. FOR BRAKE SYSTEM|Y
01|93578|10|2|DEPENDS ON APPLICATION|Y
01|93578|11|1|TABLE REQUIRES HYDRAULIC SOURCE FOR BRAKE SYSTEM|Y
01|93578|13|1|POWER/FEEDBACK CABLE SET FOR TWO AXIS|Y
01|93583|3|1|Power/Feedback Cables for 4th Axis|Y
01|93592|1|1|ref. 53618010100|Y
01|93592|2|1|ref. 53618010600|Y
01|93592|4|1|ref. 53208030403|Y
01|93592|5|1|ref. 53228000406|Y
01|93615|1|1|w/ PS-N63AE Installed at factory prior to shipping.|Y
01|93615|1|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|93615|1|3|ETA is based after receipt of order|Y
01|93621|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|93621|13|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|93621|14|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|93636|2|1|Set of three bolts.|Y
01|93636|3|1|HW-SJ-06-HS-1.5S-35>> Soft Jaw Set (3p) for HW-06-HS|Y
01|93636|3|2|(H037M6) 1 Set = 3pcs.|Y
01|93674|8|1|These knobs for promo price only|Y
01|93690|8|1|Includes 2 of the same tapered tool pots at no charge|Y
01|93694|6|1|1 $5 pull stud for every 1 toolholder purchased.|Y
01|93702|3|1|Power/Feedback Cables for 4th Axis|Y
01|93702|5|1|Includes: Drive Parameter/Ladder Changes Travel &|Y
01|93702|5|2|Lodging|Y
01|93731|1|1|Reference RGA# TOR-51807|Y
01|93731|1|2|Tool #1: CAT50-C1.1/4-105U|Y
01|93731|1|3|All bearings need to be replaced and unit must be|Y
01|93731|1|4|re-greased.|Y
01|93731|4|1|Quantity reflects hours of labor|Y
01|93731|6|1|Tool #2: CAT50-C1.1/4-105U|Y
01|93731|6|2|All bearings need to be replaced and unit must be|Y
01|93731|6|3|re-greased.|Y
01|93731|9|1|Quantity reflects hours of labor.|Y
01|93736|1|1|Delivery can change daily. Popular Table|Y
01|93736|3|1|$7500 If all done same day|Y
01|93736|3|2|Installation includes: Drive Unit Short Bar Fiber|Y
01|93736|3|3|Optic cable Communications Cables Peramiter changes|Y
01|93736|3|4|service time & travel|Y
01|93736|3|5|*Fanuc Additional axis software option not indluded|Y
01|93736|3|6|& is responsibility of SST|Y
01|93736|4|1|Chuck price is budgetary until all application info|Y
01|93736|4|2|is received.|Y
01|93737|1|1|HSK63A(80)-1000-4.00-IDU|Y
01|93737|1|2|HSK63(80) Hybrid 1.00 End Mill holder w/ 4.00 g.l.|Y
01|93737|1|3|RFID Chip Hole only. Etched: UNIV#5201|Y
01|93737|4|1|HSK63A(80)-SF0375-3.375-ID|Y
01|93737|4|2|HSK63(80) Hybrid 3/8 Shrink Fit holder w/ 3.375 g.l.|Y
01|93737|4|3|RFID Chip Hole only.  Etched: UNIV#5204|Y
01|93737|5|1|HSK63A(80)-0750-3.375-IDU|Y
01|93737|5|2|HSK63A(80) Hybrid 3/4 End Mill holder w/ 3.375 g.l.|Y
01|93737|5|3|RFID Chip Hole only. Etched: UNIV#5206|Y
01|93737|7|1|HSK63A(80)-1000-3.375-IDU|Y
01|93737|7|2|HSK63A(80) Hybrid 1.00 End Mill holder w/ 3.375 g.l.|Y
01|93737|7|3|RFID Chip Hole only.  Etched: ENIV#5207|Y
01|93744|1|1|C5016-1250A-4.00|Y
01|93744|1|2|CAT50 1.1/4 Aerospace End Mill holder w/ 4.00 g.l.|Y
01|93744|2|1|C5016-1250A-4.00|Y
01|93744|3|1|C5016-1250A-4.00|Y
01|93744|5|1|C5026-1250A-6.00|Y
01|93744|5|2|CAT50 1.1/4 Aerospace End Mill holder w/ 6.00 g.l.|Y
01|93744|6|1|C5026-1250A-6.00|Y
01|93744|7|1|C5026-1250A-6.00|Y
01|93744|8|1|C5026-1250A-8.00|Y
01|93744|8|2|CAT50 1.1/4 Aerospace End Mill holder w/ 8.00 g.l.|Y
01|93744|10|1|C5026-1250A-8.00|Y
01|93744|11|1|C5026-1250A-8.00|Y
01|93744|12|1|C5016-1250A-4.50|Y
01|93744|12|2|CAT50 1.1/4 Aerospace End Mill holder w/ 4.50 g.l.|Y
01|93745|1|1|Reference RGA# TAR-51590|Y
01|93745|1|2|CNCH202LFA-M s/n: 2001|N
01|93745|19|1|B040604G04: Brake Disk|Y
01|93745|41|1|TCE-94047/0 Feedback Cable|Y
01|93753|1|1|AC6-ECH-7F-90 Capto C6 ER11 Collet Chuck x 90mm Gage|Y
01|93753|1|2|length.|Y
01|93753|3|1|AC6-ECH-7F-90 Capto C6 ER11 Collet Chuck x 90mm Gage|Y
01|93753|3|2|length.|Y
01|93753|5|1|AC6-ECH-7F-90 Capto C6 ER11 Collet Chuck x 90mm Gage|Y
01|93753|5|2|length.|Y
01|93756|4|1|To be drilled out in house.|Y
01|93778|3|1|Discount reflects a purchase order of 10 holders.|Y
01|93779|3|1|6 port rotary union|Y
01|93779|4|1|Heidenhain scale + scale mounting kit|Y
01|93816|5|1|Delivery from receipt of spindle drawing info.|Y
01|93817|1|1|12 pieces requested|Y
01|93817|1|2|10 pieces ETA 6/29|Y
01|93817|1|3|bal of 2 pieces TBD|Y
01|93821|1|1|Repair of CAT50-UMT200U|Y
01|93821|1|2|Reference RGA# TOR-51872|Y
01|93821|3|1|***Please note that we cannot calibrate this unit on|Y
01|93821|3|2|our fixture due to the condition of the taper.|Y
01|93821|3|3|We can assist customer over the phone with instructions|Y
01|93821|3|4|on how to calibrate the tool in their machine spindle.|Y
01|93821|3|5|Please contact Tim Reeves 847-367-4800 x 72.|Y
01|93827|2|1|Quote based on standard pitch (82mm)|Y
01|93827|5|1|Delivery from receipt of spindle drawing info.|Y
01|93834|1|1|Reference RGA# TAR-51488|Y
01|93834|1|2|CNC202MA s/n: 5170|N
01|93853|1|1|Installed with pull stud PS-N100VE at factory|Y
01|93853|2|1|Installed on NC5100-FMA38.1-45 at factory|Y
01|93853|4|1|Installed with pull stud PS-N100VE at factory|Y
01|93853|5|1|Installed on NC5100-C42-95 at factory|Y
01|93856|2|1|Installation includes: drive unit short bar fiber|Y
01|93856|2|2|optic cables communication cables bulk head cable|Y
01|93856|2|3|set external cable set parameter changes service|Y
01|93856|2|4|time and travel|Y
01|93856|4|1|$ 1000 FACE VALUE TOOL CERT AT NO CHARGE|Y
01|93857|2|1|8 Self Contained Pneumatic Chuck|Y
01|93857|3|1|10 self contained pneumatic chuck|Y
01|93857|4|1|Manifold and adapter plate for pneumatic chuck|Y
01|93857|5|1|Includes drive unit interface/external cables fiber|Y
01|93857|5|2|optic cable short bar travel labor expenses|Y
01|93869|2|1|Power/Feedback Cables for 4th/5th Axis|Y
01|93869|3|1|Installation Includes: Drives Motors Parameter/Ladder|Y
01|93869|3|2|Changes & Travel Expenses.|Y
01|93871|8|1|External Coolant|Y
01|93871|20|1|External coolant|Y
01|93871|32|1|External coolant|Y
01|93890|1|1|Special Price! Limited time offer. By the end of 2018.|Y
01|93890|2|1|Special Price! Limited time offer. By the end of 2018.|Y
01|93890|3|1|Special Price! Limited time offer. By the end of 2018.|Y
01|93893|1|1|C1TA140 O-3442|Y
01|93893|1|2|Quoted as NET pricing Non-returnable Noncancelable|Y
01|93905|1|1|Non Coolant Version|Y
01|93905|2|1|Coolant Version|Y
01|93907|1|1|- Nikken 5AX-130|Y
01|93907|1|2|- Schunk KSP Plus 100|Y
01|93907|1|3|**ADAPTER PLATE**|Y
01|93916|1|1|Special Price! By the end of the year 2018.|Y
01|93916|2|1|Special Price! By the end of the year 2018.|Y
01|93916|3|1|Special Price! By the end of the year 2018.|Y
01|93918|1|1|Includes: Tilt and rotary axis motors gears cable|Y
01|93918|1|2|sets and labour cost.|Y
01|93919|1|1|1pc stock Remainder ETA pending|Y
01|93941|1|1|Special Price! Limited time offer. By the end of 2018.|Y
01|93941|2|1|Special Price! Limited time offer. By the end of 2018.|Y
01|93941|3|1|Special Price! Limited time offer. By the end of 2018.|Y
01|93975|1|1|Special NET price for old part #|Y
01|94021|1|1|Repair of MRAM-ER25-IC s/n: 65562 02 (Mim# 162765)|Y
01|94021|1|2|Reference RGA# CUR-51898|Y
01|94021|2|1|All bearings seals and o-rings must be replaced.|Y
01|94025|1|1|Reference RGA# TAR-51728|Y
01|94025|1|2|CNC260MA s/n: 8772C|N
01|94026|1|1|Reference RGA# TAR-50873|Y
01|94026|1|2|CNC200MA s/n: 8227|N
01|94026|21|1|External Cable Set|Y
01|94033|7|1|HAAS INTERFACE CABLE FOR AA21 CONTROL TO PROTOTRAK|Y
01|94037|1|1|AC6-MAS-200S  Capto C6 Test Bar with 200mm Gage|Y
01|94037|3|1|Please Note: This is the standard C6 testbar that Alps|Y
01|94037|3|2|stock.|Y
01|94041|1|1|Reference RGA# TAR-50873|Y
01|94041|1|2|TAT-170 s/n: 5025|N
01|94053|3|1|Ordering in qtys of less then 10 drops discount to 25%|Y
01|94054|2|1|Warranty replacement for defective item shipped out on|Y
01|94054|2|2|Original Inv# 2163968.|Y
01|94054|2|3|Reference RGA# QUA-51885.|Y
01|94078|7|1|POWER/FEEDBACK CABLE SET|Y
01|94094|2|1|Please note this is the new price for the FI6|Y
01|94094|2|2|shrink fit unit.|Y
01|94094|3|1|Please Note: I can offer the new SF-FI6-Unit-380|Y
01|94094|3|2|at this one time net price.|Y
01|94122|4|1|Adapter plate A2-5 for HW-08C-2J-DOD|Y
01|94122|6|1|Adapter plate A2-5 for HW-06-XLS|Y
01|94122|8|1|Adapter plate A2-5 for HW-08C-DP-S|Y
01|94122|10|1|Adapter plate A2-6 for HW-08C-COL|Y
01|94122|14|1|Adapter plate A2-6 for HW-08C-COLSJ|Y
01|94122|18|1|Adapter plate A2-6 for HW-08C-COLSJ-S|Y
01|94122|20|2|Adapter plate A2-8 for HW-10C-COLSJ-S|Y
01|94125|1|1|2.36 gl|Y
01|94125|2|1|3.54 gl|Y
01|94125|3|1|4.72 gl|Y
01|94125|5|1|2.36 gl|Y
01|94125|6|1|3.54 gl|Y
01|94125|8|1|3.54 gl|Y
01|94125|24|1|*non-coolant/ solid knob|Y
01|94125|25|1|*coolant through|Y
01|94134|3|1|THis holder is the in stock option to the line above|Y
01|94134|6|1|Balance due week of 6/5|Y
01|94145|1|1|ref. Mimatic 155367|Y
01|94145|2|1|Replacement nut for 155367|Y
01|94145|3|1|ref. 120245|Y
01|94145|4|1|ref. 120281|Y
01|94148|1|1|For OKUMA LB-3000 @ NIKKEN Factory|N
01|94148|1|2|Special NET price per HIRO.|N
01|94148|2|1|For OKUMA LB-3000 @ NIKKEN Factory|N
01|94148|2|2|Special NET price per HIRO.|N
01|94163|1|1|No stock on 5C collet P/N: 500-029  P/N: 500-054|Y
01|94163|1|2|Will ship when available|Y
01|94172|1|1|ETA 1-2 WKS pending customers5 pcs remain in|Y
01|94172|1|2|factory stock|Y
01|94172|1|3|Quoted as NET pricing|Y
01|94172|1|4|Mimatic Part# 123916|Y
01|94172|1|5|EMAG VL5; VDI40;ER32;Ext Coolant; 1015 PSI; 7500 RPM|Y
01|94184|1|1|Reference RGA# LVR-51795|Y
01|94184|1|2|Repair of MZQT47-ER32Z s/n: 6070250801|Y
01|94184|1|3|Mimatic# 124635|Y
01|94184|2|1|Bearings seals and o-rings to be replaced.|Y
01|94184|4|1|Repair of 1x MZQT47-ER32Z s/n: 7070145602|Y
01|94184|4|2|Mimatic# 124635|Y
01|94184|5|1|Bearings seals & o-rings to be replaced.|Y
01|94184|7|1|Repair of 1x MZQT47-ER32Z s/n: 51603|Y
01|94184|7|2|Mimatic# 124635|Y
01|94184|8|1|All bearings seals and o-rings must be replaced.|Y
01|94186|1|1|Net Price Quoted|Y
01|94187|3|1|CLAMPING RANGE 1.969 - 2.031|Y
01|94187|4|1|CLAMPING RANGE 1.969 - 2.031|Y
01|94187|5|1|CLAMPING RANGE 2.0 - 2.0625|Y
01|94187|6|1|CLAMPING RANGE 2.0 - 2.0625|Y
01|94190|1|1|ref. N29110|Y
01|94190|2|1|ref. N29101|Y
01|94197|1|1|Price authorized by Bob Berongi|Y
01|94198|1|1|for B4016-20-4.00 end mill holder|Y
01|94223|1|1|P/N: C5001-40-150|Y
01|94223|1|2|CAT50 40mm Shell Mill holder w/ 150mm g.l.|Y
01|94237|2|1|Installation includes: Drive unit short bar fiber|Y
01|94237|2|2|optic cable communications cable bulkhead cables|Y
01|94237|2|3|external cables parameter changes service time and|Y
01|94237|2|4|travel.|Y
01|94239|6|1|NET price|Y
01|94239|6|2|*Additional pcs to be quoted|Y
01|94239|6|3|**ER20 capacity:  2-13mm|Y
01|94240|2|1|Replacement cable set|Y
01|94240|3|1|Scale mounting kit|Y
01|94250|9|1|Please Note: I have quoted the pull stud promo.|Y
01|94250|9|2|Knobs are $5.00 net each with the purchase of the|Y
01|94250|9|3|matching taper holder.|Y
01|94283|2|1|BT40-UMTX200W-RB4 BT40 Universal Micro Touch|Y
01|94283|2|2|With Ruby 4mm stylus|Y
01|94289|4|1|Installed on above NC5-100-SGT|Y
01|94289|7|1|Installed on above NC5-100-TB40-300|Y
01|94300|1|1|Collapse Range: 1.344-1.406|Y
01|94300|2|1|Collapse Range: 1.532-1.594|Y
01|94327|22|1|Please Note: Net price reflects a purchase order of|Y
01|94327|22|2|retention knob with matching taper holder.|Y
01|94338|2|1|Brian wanted S10SF-0500-6.00-3 which is DC.I gave him|Y
01|94338|2|2|this part number.He will check if cust wants a quote|Y
01|94350|1|1|Please Note: This collet is non standard stock. Once|Y
01|94350|1|2|a purchase order is placed it cannot be cancelled|Y
01|94350|1|3|or returned.|Y
01|94368|1|1|Quoted as NET pricing Non-returnablenon-cancelable|Y
01|94368|2|1|Quoted as NET pricing Non-returnablenon-cancelable|Y
01|94368|3|1|Quoted as NET pricing Non-returnablenon-cancelable|Y
01|94371|7|1|Sub plate to mount (2) PBA-105 @ 250mm between spindles|Y
01|94384|2|1|C8-1000-6.00 Capto C8 End Mill Holder 1.0 X 6.0 Gage|Y
01|94384|3|1|C8-1000-6.00  CAPTO8 1 EMH 6 GL|Y
01|94384|97|1|SKJ25-7/16  SK20/SK25 Coolant Cap 7/16 Jet Slots|Y
01|94384|125|1|C8-0750-4.00  Capto C8 End Mill Holder 3/4 X 4.00 Gage|Y
01|94384|126|1|C8-0750-4.00  Capto C8 End Mill Holder 3/4 X 4.00 GL|Y
01|94384|128|1|C8-SM0750-8.00|Y
01|94384|129|1|C8-C1.1/4-225-IDU|Y
01|94417|2|1|Machine: Sharp|Y
01|94417|2|2|NET PRICE|Y
01|94417|2|3|Lyndex-Nikken can make the position block upon receipt|Y
01|94417|2|4|of machine spindle information|Y
01|94417|4|1|*pricing used for example of collet pricing|Y
01|94419|1|1|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|94435|1|1|Tooling Certificate Number: 10035-1008-080217|Y
01|94440|4|1|This item is not a part of the core trade in program|Y
01|94440|4|2|the max discount we can offer is 35%|Y
01|94440|6|1|The wrenches above are the same as required for the|Y
01|94440|6|2|MZQT47-ER32X version.No need to purchase new ones|Y
01|94440|6|3|I added them in for consistency|Y
01|94442|1|1|Quoted at Net Price|Y
01|94442|2|1|Quoted at Net Price|Y
01|94452|2|1|NCS-6.03 Reamer ST 3.03mm NC Sensor|Y
01|94452|4|1|NCS-8.03 Reamer ST 8.03mm NC Sensor|Y
01|94452|6|1|NCS-10.03 Reamer ST 10.03mm NC Sensor|Y
01|94452|8|1|NCS-13.03 Reamer ST 13.03mm NC Sensor|Y
01|94452|9|1|NCS-13.03 Reamer ST 13.03mm NC Sensor|Y
01|94452|10|1|NCS-16.03 Reamer ST 16.03mm NC Sensor|Y
01|94461|2|1|External Power/Feedback Cables (4th & 5th Axis)|Y
01|94464|3|1|NB4006-0750-2.50  BT40 3/4 End Mill Holder|Y
01|94496|1|1|Reference RGA# LVR-51950|Y
01|94496|1|2|Repair of T32214 L/N# MNL12-ER40Z s/n: A0107|Y
01|94496|2|1|Bearings Seals Spindle Shaft Spindle Cover Bearing|Y
01|94496|2|2|Nut O-Rings Oil Seals Collet Nut & labor|Y
01|94496|4|1|Repair of T32214 L/N# MNL12-ER40Z s/n: A0133|Y
01|94496|5|1|Bearings Seals Spindle Shaft Spindle Cover Bearing|Y
01|94496|5|2|Nut O-Rings Oil Seals Collet Nut & labor|Y
01|94496|7|1|Core trade in discount to purchase new replacements.|Y
01|94496|7|2|2pcs currently in stock.|Y
01|94513|4|1|For manufacture of correct position block HAAS VF3|Y
01|94530|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|94534|1|1|Please make sure holder is being used on Mori Seiki|Y
01|94534|1|2|machine.|Y
01|94546|3|1|Schunk KPS-160 Vise with STR-S Jaws and Custom Adapter|Y
01|94546|8|1|Tilt axis scale|Y
01|94550|2|1|C5026-0625A-8.00|Y
01|94550|2|2|CAT50-5/8 End Mill Aerospace holder|Y
01|94583|1|1|Repair of MZQT47-ER32Z-MS S/N: 4559701 Mim# 124638|Y
01|94583|1|2|Reference RGA# LVR-51933|Y
01|94583|2|1|Bearings seals and o-rings must all be replaced.|Y
01|94583|2|2|Labor is included.|Y
01|94595|2|1|**Adapter supplied is In-Direct Mount and is thicker|Y
01|94595|2|2|than a standard adapter** refer JF Bern drawing|Y
01|94595|3|1|M85 X 2 Draw nut|Y
01|94611|1|1|Consignment for time study|Y
01|94619|1|1|Reference RGA# TAR-51824|Y
01|94619|1|2|CNC100-2W-120FA s/n: 9000|N
01|94619|40|1|Replacement Motor|Y
01|94634|3|1|TAT-250 and CNC321 have a different center height|Y
01|94634|3|2|a riser would be required.|Y
01|94635|1|1|MAX CAPCITY 1/2|Y
01|94635|2|1|NEED TO VERIFY NEEDS FOR 1 ARBOR.|Y
01|94635|2|2|THIS PART NUMBER IS HOLDER FOR 5 ISCAR SHELL MILL|Y
01|94635|2|3|NEED TO VERIFY NEEDS FOR THAT SHELL MILL.|Y
01|94635|3|1|NEED TO VERIFY REQUIREMENTS FOR 1-1/2 ARBOR HOLDER|Y
01|94635|4|1|GAUGE LENGTH 2.63 REQUESTED 3|Y
01|94635|6|1|GAUGE LENGTH 2.5 REQUESTED 3|Y
01|94653|2|1|External Power/Feedback Cables for 4th Axis|Y
01|94657|1|1|Replacement for table sent in for evaluation on|Y
01|94657|1|2|RGA# TAR-51824.|Y
01|94661|1|1|Reference RGA# TAR-51753|Y
01|94661|1|2|5AX-350FA-R36 s/n: 3961|N
01|94680|1|1|Reference RGA#TAR-51894|Y
01|94680|1|2|CNC300 1198E|N
01|94680|15|1|Wire harness Power and feed back|Y
01|94688|1|1|Delivery: Incoming air cut-off 6/6. If ordered by this|Y
01|94688|1|2|date delivery will be week of 6/11.  Next incoming air|Y
01|94688|1|3|is 1st week in July.|Y
01|94698|3|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|94698|4|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|94698|5|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|94711|1|1|No tool cert due to discontinued motors/drives and|Y
01|94711|1|2|increased cost of components|Y
01|94711|1|3|6-8 weeks for delivery for junction box sheet metal|Y
01|94711|1|4|junction box cable|Y
01|94712|2|1|External Cable Set|Y
01|94716|1|1|Repair of OKL3-ER32Z-OFMS s/n: AL122 OK109-15001|Y
01|94716|1|2|Reference RGA# LVR-51953|Y
01|94716|2|1|Bearings O-rings Oil Seals Collet Nuts & Labor|Y
01|94735|5|1|Special Net Terms|Y
01|94735|5|2|Deposit Required = $3000.00|Y
01|94735|5|3|Deposit Collected via Check # 2977|Y
01|94735|5|4|Sub Total = $51384.82|Y
01|94735|5|5|Monthly Payment = $4282.07|Y
01|94735|5|7|First installment to be paid upon completion of|Y
01|94735|5|8|installation subsequent installments are of 30 days|Y
01|94735|5|9|are of 30 days.|Y
01|94736|5|1|Special Net Terms|Y
01|94736|5|2|Deposit Required = $3000.00|Y
01|94736|5|3|Deposit received via Check # 2972|Y
01|94736|5|4|Sub Total = $51384.82|Y
01|94736|5|5|Monthly Payment = $4282.07|Y
01|94736|5|7|First installment to be paid upon completion of|Y
01|94736|5|8|installation subsequent installments are of 30 days|Y
01|94736|5|9|are of 30 days.|Y
01|94752|1|1|Reference RGA# LVR-51805|Y
01|94752|1|2|Repair of customer's MNL12-ER11(X)-SUB-SP s/n: 81998 02|Y
01|94752|1|3|(Mim# 183938)|Y
01|94752|2|1|Replace all bearings seals and o-rings.|Y
01|94752|2|2|Labor is included.|Y
01|94758|1|1|CNC180ZA-M|Y
01|94762|1|1|Reference RGA# TAR-51900|Y
01|94762|1|2|NCTZ150LSA3 s/n: 8071|N
01|94771|3|1|Installed with Nikken PS-132 Pull Stud at factory|Y
01|94771|4|1|Installed on BT30-TB40-200 at factory|Y
01|94788|4|1|M-code for ATL206-5C|Y
01|94794|5|1|OKEX-ER32X-OFF|Y
01|94794|5|2|1 PC Pricing Quoted as NET pricing Non-returnable|Y
01|94794|5|3|Non-cancelable|Y
01|94794|6|1|OKEX-ER32X-OFF|Y
01|94794|6|2|2 PC Pricing Quoted as NET pricing Non-returnable|Y
01|94794|6|3|Non-cancelable|Y
01|94797|5|1|OKEX-ER32X-OFF|Y
01|94797|5|2|1 PC Pricing Quoted as NET pricing Non-returnable|Y
01|94797|5|3|Non-cancelable|Y
01|94803|4|1|C5031-1000-10.00|Y
01|94803|4|2|SPECIAL; NON-CANCELLABLE; NON-RETURNABLE|Y
01|94803|4|3|PRICING INFORMATION HAS BEEN REQUESTED|Y
01|94803|10|1|PRICING INFORMATION HAS BEEN REQUESTED FOR ITEM|Y
01|94807|5|1|INCLUDES FANUC DRIVE|Y
01|94807|5|2|DOES NOT INCLUDE ACTIVATING 4TH AXIS OPTION ON|Y
01|94807|5|3|CONTROL IF NEEDED.|Y
01|94814|1|1|Quoted at Net Price|Y
01|94826|1|1|13485-1154-032618|Y
01|94828|2|1|Installation includes: drive unit short bar fiber|Y
01|94828|2|2|optic cables communication cables bulk head cable|Y
01|94828|2|3|set external cable set parameter changes service|Y
01|94828|2|4|time and travel|Y
01|94829|18|1|No charge if ordered with holder above|Y
01|94833|1|1|w/ PS-123-AIR(Pull Stud).|Y
01|94845|3|1|Non-returnable Non-cancelable|Y
01|94850|1|1|Special Price! Limited time offer. By the end of 2018.|Y
01|94850|2|1|Special Price! Limited time offer. By the end of 2018.|Y
01|94850|3|1|Special Price! Limited time offer. By the end of 2018.|Y
01|94854|1|1|Reference RGA# TOR-51946|Y
01|94854|1|2|Tool #1: CAT50-C3/4-105U|Y
01|94854|6|1|Total for repair of Tool #1: CAT50-C3/4-105U: $136.64|Y
01|94854|8|1|Repair of Tool #2: HSK100A-C3/4-115G|Y
01|94854|14|1|Total for repair of Tool #2: HSK100A-C3/4-115G: $139.34|Y
01|94859|8|1|Back Up Screw for 3/4 Milling Chuck|Y
01|94859|11|1|SKG-22 Back up screw for the SK20|Y
01|94865|1|1|Quoted at net price.|Y
01|94869|1|1|Asked purchasing for quote on P&D|Y
01|94870|1|1|C5001-1000-12.00|Y
01|94870|1|2|CAT50 1 Shell Mill Holder w 120|Y
01|94878|10|1|$300 additional if we machine positioning block|Y
01|94884|2|1|We can machine positioning block or customer can do it|Y
01|94884|2|2|Add $300 if we machine the positioning block|Y
01|94904|2|1|Installation includes: drive unit short bar fiber|Y
01|94904|2|2|optic cables communication cables bulk head cable|Y
01|94904|2|3|set external cable set parameter changes service|Y
01|94904|2|4|time and travel|Y
01|94908|1|1|Reference RGA# TOR-51947|Y
01|94908|1|2|Repair of Tool #2: CAT50-C3/4-105U|Y
01|94908|8|1|Repair of Tool# 4: CAT50-C3/4-105U|Y
01|94908|15|1|Quote for replacements 2x CAT50-C3/4-105U.|Y
01|94908|15|2|Tools #1 & #3 are un-repairable damage on the ID and|Y
01|94908|15|3|OD of the nose due to broken bearing cage.|Y
01|94915|2|1|Support Table for Between Centers Machining|Y
01|94915|3|1|Hydraulic Pump for Hydraulic Braking on Table and TAT|Y
01|94915|4|1|External Power/Feedback Cables for 4th Axis Rotary|Y
01|94915|5|1|If 4th Axis Drives & Wiring are Already Installed the|Y
01|94915|5|2|Installation charge will be reduced significantly|Y
01|94915|5|3|Parameter changes may be required for proper operation|Y
01|94915|5|4|Machine Data Sheets and Wiring Diagrams Needed Prior to|Y
01|94915|5|5|Installation by Lyndex Nikken.|Y
01|94920|1|1|35% discount only due to discontinued motors and drives|Y
01|94920|1|2|No tooling certificate|Y
01|94921|1|1|FACE VALUE OF CERTIFICATE = $175000.00|Y
01|94928|1|1|w/ PS-72|Y
01|94928|3|1|w/ PS-O9|Y
01|94940|9|1|see below for stock options for other 2 sets|Y
01|94940|24|1|See the below list of items which would complete this|Y
01|94940|24|2|set as individual collet options which are in stock|Y
01|94947|1|1|H023M10 #4 Draw Screw-Replacement Part|Y
01|94947|1|2|Quoted as NET pricing|Y
01|94947|1|3|Non-Returnable Non-Cancelable|Y
01|94947|2|1|H023M10#5 Retainer Replacement Part|Y
01|94947|2|2|Quoted as NET pricing|Y
01|94947|2|3|Non-returnable Non-cancelable|Y
01|94947|3|1|H023HM10#6 Spring Replacement Part|Y
01|94947|3|2|Quoted as NET pricing|Y
01|94947|3|3|Non-Returnable Non-cancelable|Y
01|94947|4|1|H023M10#7 Steel Ball Replacement Part|Y
01|94947|4|2|Quoted as NET pricing|Y
01|94947|4|3|Non-returnable Non-cancelable|Y
01|94949|5|1|EXTERNAL CABLE SET INCLUDED|Y
01|94957|1|1|Reference RGA# LVR-51978|Y
01|94957|1|2|Repair of MZMP47-ER32X-OFF-C s/n: 7363405|Y
01|94957|2|1|All bearings seals and o-rings must be replaced.|Y
01|94957|2|2|Labor is included.|Y
01|94960|1|1|Please Note: Tap shank .315 and square .248 are|Y
01|94960|1|2|required to use this collet.|Y
01|94960|1|3|Net price quoted.|Y
01|94976|1|1|CAT50; 90deg AGH;Torque arm center distance A=110mm;|Y
01|94976|1|2|d=28mm tooling interface pilot arbor 3 inches dia;|Y
01|94976|1|3|2x1/2 key saw blade interface;|Y
01|94976|1|4|no coolant supply; input is reversal to output;|Y
01|94976|1|5|L=215mm; L1=105mm;1:1 Gear ratio; max torque M=150Nm;|Y
01|94976|1|6|5000RPM;approx 19kg ref drawg# 00053696|Y
01|94976|1|7|Quoted as Net pricing Non-cancelableNon-returnable|Y
01|94976|2|1|CAT50; 90deg AGH;Torque arm center distance A=110mm;|Y
01|94976|2|2|d=28mm tooling interface pilot arbor 3 inches dia;|Y
01|94976|2|3|2x1/2 key saw blade interface;(For 3 saw blades 8inche|Y
01|94976|2|4|dia)no coolant supply; input is reversal to output;|Y
01|94976|2|5|L=215mm; L1=210mm;2.5:1 Gear ratio; max torque M=250Nm;|Y
01|94976|2|6|n1=4500 RPM / n2 = 1800RPM approx 19kg|Y
01|94976|2|7|ref drawg# 00047302|Y
01|94976|2|8|Drawing from the tool interface from the machining|Y
01|94976|2|9|need to be provided|Y
01|94976|2|10|Quoted as Net pricing Non-cancelableNon-returnable|Y
01|94984|3|1|HSK100A TESTBAR Dia. 50mm (1.97) GL 400mm (15.75)|Y
01|94988|2|1|Drive external cables internal cables|Y
01|94988|2|2|fiber optic cables short bar and Fanuc|Y
01|94988|2|3|battery.|Y
01|94999|2|1|CLAMP/UNCLAMP CABLE SET EA AXIS|Y
01|94999|2|2|LENGTH NEEDS TO BE DETERMINED|Y
01|95003|2|1|Support Table for Machining Shafts Between Centers|Y
01|95003|3|1|Hydraulic Unit for Braking on Rotary and Support Table|Y
01|95003|4|1|External Power/Feedback Cables for 4th Axis|Y
01|95003|5|1|Includes: Drives Parameter Changes & Travel Expenses|Y
01|95012|2|1|for .357 drill|Y
01|95012|6|1|for E20-EXT-100|Y
01|95015|1|1|Reference RGA# TOR-51972|Y
01|95015|1|2|Repair of customer's CAT40-NPU8-80U|Y
01|95015|3|1|Total Repair Price: $410.35 NET|Y
01|95021|1|1|Reference RGA# TOR-52028|Y
01|95021|1|2|Repair of CAT40-UMT200|Y
01|95021|2|1|Replacement Battery|Y
01|95031|1|1|Reference RGA# TAR-51960|Y
01|95031|1|2|P-170S|N
01|95041|1|1|Reference RGA# TOR-52015|Y
01|95041|1|2|Repair of S20-UMT|Y
01|95041|2|1|Unit must be recalibrated|Y
01|95053|1|1|Reference RGA# LVR-52009|Y
01|95053|1|2|Repair of customer's MZQT46-ER16-AD-HS s/n: 2919502|Y
01|95053|1|3|(Mimatic# 125055)|Y
01|95053|2|1|Gears bearings seals & o-rings to be replaced.|Y
01|95053|2|2|Labor is included.|Y
01|95058|1|1|STATIC CAPTO POSITION 9 AND 10|Y
01|95058|2|1|STATIC CAPTO POSITION 4|Y
01|95062|1|1|Reference RGA# TOR-52021|Y
01|95062|1|2|Repair of PF-2|Y
01|95062|2|1|Labor quoted for re-calibration.|Y
01|95063|3|1|2-port rotary union|Y
01|95066|3|1|2 port rotary union|Y
01|95083|4|1|1 PC Delivery TBD|Y
01|95108|1|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|95108|2|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|95108|3|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|95108|4|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|95108|5|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|95108|8|1|SF5.5-C16-121 for Drawing 61095945.000|Y
01|95108|9|1|SF5.5-C16-121 for Drawing 61095945.000|Y
01|95108|10|1|SF5.5-C16-121 for Drawing 61095945.000|Y
01|95108|11|1|SF5.5-C16-121 for Drawing 61095945.000|Y
01|95108|12|1|SF5.5-C16-121 for Drawing 61095945.000|Y
01|95108|15|1|SF5.9-C16-121 for Drawing 60455996.000|Y
01|95108|16|1|SF5.9-C16-121 for Drawing 60455996.000|Y
01|95108|17|1|SF5.9-C16-121 for Drawing 60455996.000|Y
01|95108|18|1|SF5.9-C16-121 for Drawing 60455996.000|Y
01|95108|19|1|SF5.9-C16-121 for Drawing 60455996.000|Y
01|95108|22|1|SF6.2-C16-121 for Drawing 60455996.000|Y
01|95108|23|1|SF6.2-C16-121 for Drawing 60455996.000|Y
01|95108|24|1|SF6.2-C16-121 for Drawing 60455996.000|Y
01|95108|25|1|SF6.2-C16-121 for Drawing 60455996.000|Y
01|95108|26|1|SF6.2-C16-121 for Drawing 60455996.000|Y
01|95108|29|1|SF7.6-C16-121 for Drawing No Number Referenced|Y
01|95108|30|1|SF7.6-C16-121 for Drawing No Number Referenced|Y
01|95108|31|1|SF7.6-C16-121 for Drawing No Number Referenced|Y
01|95108|32|1|SF7.6-C16-121 for Drawing No Number Referenced|Y
01|95108|33|1|SF7.6-C16-121 for Drawing No Number Referenced|Y
01|95116|1|1|Reference RGA# QUA-51985|Y
01|95116|1|2|Repair of customer's HA40M-SK20Z-ICE s/n:77239 06|Y
01|95116|1|3|(Mim#185987)|Y
01|95116|2|1|Replace all bearings seals and o-rings.|Y
01|95116|2|2|Labor is included.|Y
01|95161|1|1|FACE VALUE OF CERTIFICATE = $175000.00|Y
01|95163|1|1|Set price adjusted down to not include B/O item 800-012|Y
01|95172|2|1|CLAMP/UNCLAMP CABLE SET EA AXIS.|Y
01|95173|1|1|APPLICATION REQUIRES ALPHA4/5000iS MOTOR TO INTERFACE|Y
01|95173|1|2|WITH H104 AMP|Y
01|95178|1|1|Reference RGA#TAR-51822|Y
01|95178|1|2|5AX-201YA s/n: 5498|N
01|95180|1|1|2 IN STOCK|Y
01|95180|1|2|NOTHING ON VBO|Y
01|95180|1|3|18 NEEDED|Y
01|95180|2|1|-2 IN STOCK|Y
01|95180|2|2|6 ON VBO DUE 7-6-18|Y
01|95180|2|3|26 NEEDED|Y
01|95180|3|1|4 IN STOCK|Y
01|95180|3|2|0 VBO|Y
01|95180|3|3|26 NEEDED|Y
01|95180|4|1|14 IN STOCK|Y
01|95180|4|2|0 VBO|Y
01|95180|4|3|16 NEEDED|Y
01|95180|5|1|20 IN STOCK|Y
01|95180|6|1|3 IN STOCK|Y
01|95180|6|2|16 due 6-6-18|Y
01|95180|7|1|11 IN STOCK|Y
01|95180|7|2|11 OB DON'T KNOW DATE|Y
01|95180|8|1|1 IN STOCK|Y
01|95180|8|2|10 VBO DUE 6-29-18|Y
01|95180|8|3|4 NEEDED|Y
01|95183|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|95191|1|1|Service call performed by Jun Furukawa|Y
01|95191|1|2|4x 5AX-130BYA-BR s/n: 5432 3804 NA & NA|Y
01|95191|2|1|Transit Time: 6hrs x 100/hr = $600.00|Y
01|95191|2|2|Gas mileage: 257.6 total miles x $0.565/mi = $145.54|Y
01|95191|2|3|Meals: $35/day x 2 days = $70.00|Y
01|95192|1|1|Table comes with hard wired cable set.|Y
01|95192|2|1|Included with the table purchase.|Y
01|95192|3|1|Schunk KPS-160 Vise with STR-S Jaws and Custom Adapter|Y
01|95195|1|1|The set includes: 2-twin spindle table sheet metal|Y
01|95195|1|2|drive units junction box external cables and cabinet|Y
01|95195|1|3|cable sets.|Y
01|95196|1|1|No tool cert due to discontinued motors/drives and|Y
01|95196|1|2|increased cost of components|Y
01|95196|1|3|3-4 weeks for delivery for junction box sheet metal|Y
01|95196|1|4|junction box cable|Y
01|95225|1|1|ref. 190231|Y
01|95225|2|1|OKE4-ER32X-OFF-ICE|Y
01|95225|3|1|ref. 190233|Y
01|95236|2|1|QCFC80-028-SMO Quick Change Flex Collet 80 Round Smooth|Y
01|95236|4|1|QCFC80-036-SMO Quick Change Flex Collet 80 Round 9/16In|Y
01|95236|9|1|QCFC80-08M-EMR Quick Change Flex Collet 8mm Emergency|Y
01|95236|11|1|Quick Change Flex Collet 80 Round Smooth 15/16|Y
01|95236|35|1|QCFC80-044-HEX Quick Change Flex Collet 80 11/16 HEX|Y
01|95236|36|1|QCFC80-040-HEX Quick Change Flex Collet 80 5/8 HEX|Y
01|95236|37|1|QCFC80-032-HEX Quick Change Flex Collet 80 HEX 1/2 INCH|Y
01|95253|1|1|D21 Chuck pancake cylinder drawbar & nose piece.|Y
01|95270|1|1|Shrink Fit Extender Shank Dia. ID:3mm OD:10mm|Y
01|95270|1|2|Special Order. Unit Price Each.|Y
01|95270|2|1|Shrink Fit Extender Shank Dia. ID:3mm OD:10mm|Y
01|95270|2|2|Special Order. Unit Price Each.|Y
01|95270|3|1|Shrink Fit Extender Shank Dia. ID:3mm OD:10mm|Y
01|95270|3|2|Special Order. Unit Price Each.|Y
01|95271|5|1|INSTALLATION INCLUDES: INTERNAL CABLES BULKHEAD|Y
01|95271|5|2|CONNECTORS FIBER OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|95271|5|3|SERVO MOTORS AND WIRE HARNESS. ALSO INCLUDES: LABOR AND|Y
01|95271|5|4|TRAVEL EXPENSES FOR LYNDEX NIKKEN SERVICE TECHNICIAN|Y
01|95272|5|1|INSTALLATION INCLUDES: INTERNAL CABLES BULKHEAD|Y
01|95272|5|2|CONNECTORS FIBER OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|95272|5|3|SERVO MOTORS AND WIRE HARNESS. ALSO INCLUDES: LABOR AND|Y
01|95272|5|4|TRAVEL EXPENSES FOR LYNDEX NIKKEN SERVICE TECHNICIAN|Y
01|95291|4|1|#184725BMT55;MI50;Straight; L!=74mm;Int Coolant|Y
01|95291|4|2|through spindle/Ext coolant through pipe;1:1 gear ratio|Y
01|95291|4|3|max 70Nm;10000RPM|Y
01|95291|4|4|ref drawing#00049216|Y
01|95291|6|1|#188842;MBMT55:MI50 90 deg;L1=85mm;Int coolant through|Y
01|95291|6|2|pipe;1:1 Gear ration;mac 70Nm;|Y
01|95291|6|3|Reversal of rotation|Y
01|95291|6|4|ref drawing #00050093|Y
01|95304|1|1|3 in stock. Need to request price and delivery for|Y
01|95304|1|2|additional quanity. Please advise us if you want us|Y
01|95304|1|3|to request a quote.|Y
01|95318|2|1|QCFC80-028-SMO Quick Change Flex Collet 80 7/16 smooth|Y
01|95318|4|1|QCFC80-036-SMO Quick Change Flex Collet 80 Round 9/16In|Y
01|95318|9|1|QCFC80-08M-EMR Quick Change Flex Collet 8mm Emergency|Y
01|95318|11|1|QCFC80-060-SMO Quick Change Flex Collet 80 Smooth 15/16|Y
01|95318|35|1|QCFC80-044-HEX Quick Change Flex Collet 80 11/16 HEX|Y
01|95318|36|1|QCFC80-040-HEX Quick Change Flex Collet 80 5/8 HEX|Y
01|95318|37|1|QCFC80-032-HEX Quick Change Flex Collet 80 HEX 1/2 INCH|Y
01|95328|5|1|EXTERNAL CABLE SET INCLUDED|Y
01|95329|15|1|4|N
01|95338|1|1|NL3000|Y
01|95338|2|1|PUMA 500M - VERIFY NUM TOOLS ON TURRET|Y
01|95338|3|1|OKUMA|Y
01|95350|1|1|Budget Quotation|Y
01|95350|1|2|8 Hours Labor time at customer's facility|Y
01|95350|1|3|10 Hours Round Trip Travel Time|Y
01|95350|1|4|Misc Expenses|Y
01|95351|15|1|Please Note:Retention knobs can be taken at $5.00 net|Y
01|95351|15|2|with the purchase of the matching taper holder.|Y
01|95363|1|1|Reference RGA# TAR-52052|Y
01|95363|1|2|5AX-2MT-105-120FA-M s/n: 8265F|Y
01|95371|1|1|Reference RGA# LVR-52031|Y
01|95371|1|2|Repair of customer's MZQT47-ER25X-OFF-HS s/n:6038010|Y
01|95371|1|3|(Mimatic#124067)|Y
01|95371|2|1|Replace all bearings seals and o-rings|Y
01|95371|2|2|Labor is included.|Y
01|95375|2|1|Mark I need PO today no later than 1:00pm in order to|Y
01|95375|2|2|meet the 2 week delivery.|Y
01|95380|4|1|Quoted as NET pricing|Y
01|95380|4|2|MNL12-ER32X-OFF-ICE|Y
01|95384|4|1|Quoted as NET pricing|Y
01|95384|4|2|MNL12-SK20X-OFF-ICE|Y
01|95387|1|1|5AX-201YA s/n: 5112|Y
01|95393|1|1|*New Style! Clamping Nut in Front.|Y
01|95393|1|2|No longer uses retention knob.|Y
01|95393|1|3|*ICE - internal coolant but can run dry as well|Y
01|95393|3|1|*ICE - internal coolant but can run dry as well|Y
01|95396|4|1|Hubbel cable retractor BD-05 6' for 3-5lbs|Y
01|95420|1|1|Complete with Fanuc Motor - Back Mounted|Y
01|95441|2|1|HSK100A-C42-135 HSK100A 42mm Milling Chuck|Y
01|95459|4|1|INSTALLATION INCLUDES:  INTERNAL CABLES BULKHEAD|Y
01|95459|4|2|CONNECTORS FIBER OPTIC CABLES ADDITIONAL DRIVES|Y
01|95459|4|3|SERVO MOTORS AND WIRING HARNESSES. ALSO INCLUDED:|Y
01|95459|4|4|LABOR AND ANY TRAVEL RELATED EXPENSES FOR LYNDEX NIKKEN|Y
01|95459|4|5|SERVICE TECHNICIANS TO COMPLETE THE INSTALLATION|Y
01|95463|1|1|13170-1177-060718|Y
01|95476|12|1|HYD LINES AND FITTINGS|Y
01|95476|14|1|Labor for Install of Cable and Hyd Lines|Y
01|95483|2|1|VOLTAGE NEEDS TO BE DETERMINED.|Y
01|95503|1|1|Reference RGA# TAR-52054|Y
01|95503|1|2|5AX-130FA s/n: NA|N
01|95503|38|1|Expedite fee to have repair completed and ready to ship|Y
01|95503|38|2|by 6/20/18.|Y
01|95504|1|1|TAT FACEPLATE WITHOUT GROOVE (ref S/N 2310)|Y
01|95504|1|2|INCLUDEDS 4 + 1 ROTARY UNION|Y
01|95504|1|3|DELIVERY 11/20/2018 FROM FACTORY + SHIPPING AIR/BOAT|Y
01|95536|2|1|Model#|Y
01|95536|2|2|non-coolant version of PS-598|Y
01|95538|1|1|Reference RGA# TAR-52093|Y
01|95538|1|2|CNC180 s/n: 25959T|N
01|95538|7|1|Expedite fee to have table evaluated/repaired within|Y
01|95538|7|2|3 business days of receipt.|Y
01|95542|1|1|Reference RGA# LVR-52034|Y
01|95542|1|2|Repair of MNL12-ER40Z s/n:A0130|Y
01|95542|1|3|(Alps#T32214)|Y
01|95542|2|1|Bearings o-rings seals collet nut and adjust collar|Y
01|95542|2|2|to be replaced. Labor is included.|Y
01|95542|3|1|Repair of MNL12-ER40Z s/n:A0131|Y
01|95542|3|2|(Alps#T32214)|Y
01|95542|4|1|Bearings o-rings seals collet nut bearing nut and|Y
01|95542|4|2|adjust collar to be replaced. Labor is included.|Y
01|95544|1|1|Includes Haas Motors and Cables.|Y
01|95548|1|1|Reference RGA#LVR-51975|Y
01|95548|1|2|Repair of customer's OKL4-ER40X s/n:AL168|Y
01|95548|1|3|(Alps#OK102-18000)|Y
01|95548|2|1|Spindle bearings seals & o-rings to be replaced|Y
01|95548|2|2|***We will try to clean up the original spindle and|Y
01|95548|2|3|re-use; however we will not be able to tell if it will|Y
01|95548|2|4|be re-usable until assembled and test ran. If we are|Y
01|95548|2|5|able to re-use the price will be $1109.89|Y
01|95551|1|1|Price does not include freight|Y
01|95551|1|2|NET pricing non-returnable non-cancelable|Y
01|95551|2|1|price does not include freight|Y
01|95551|2|2|NET pricing non-returnable non-cancelable|Y
01|95559|2|1|External Cables(Table to Bulkhead)|Y
01|95559|3|1|Includes Installation Drive Units Bulkhead Cables|Y
01|95559|3|2|External Cables Service Time & Travel|Y
01|95591|1|1|adapter plate will be removed from the set|Y
01|95603|8|1|H63F-SF0125-6.00|Y
01|95603|9|1|H63F-SF0125-6.00|Y
01|95603|10|1|H63F-SF0250-6.00|Y
01|95603|11|1|H63F-SF0250-6.00|Y
01|95603|12|1|H63F-SF0375-6.00|Y
01|95603|13|1|H63F-SF0375-6.00|Y
01|95603|14|1|H63F-SF0500-6.00|Y
01|95603|16|1|H63F-SF0625-6.00|Y
01|95603|18|1|H63F-SF0750-6.00|Y
01|95603|21|1|H63F-SF0125-3.00MT|Y
01|95603|22|1|H63F-SF0125-3.00MT|Y
01|95603|23|1|H63F-SF0125-6.00MT|Y
01|95603|24|1|H63F-SF0125-6.00MT|Y
01|95603|25|1|H63F-SF0250-3.00MT|Y
01|95603|26|1|H63F-SF0250-3.00MT|Y
01|95603|27|1|H63F-SF0250-6.00MT|Y
01|95603|28|1|H63F-SF0250-6.00MT|Y
01|95603|29|1|H63F-SF0375-3.00MT|Y
01|95603|30|1|H63F-SF0375-3.00MT|Y
01|95603|31|1|H63F-SF0375-6.00MT|Y
01|95603|32|1|H63F-SF0375-6.00MT|Y
01|95603|33|1|H63F-SF0500-3.00MT|Y
01|95603|34|1|H63F-SF0500-3.00MT|Y
01|95603|35|1|H63F-SF0500-6.00MT|Y
01|95603|36|1|H63F-SF0500-6.00MT|Y
01|95603|37|1|H63F-SF0625-3.00MT|Y
01|95603|38|1|H63F-SF0625-3.00MT|Y
01|95603|39|1|H63F-SF0625-6.00MT|Y
01|95603|40|1|H63F-SF0625-6.00MT|Y
01|95603|41|1|H63F-SF0750-3.00MT|Y
01|95603|43|1|H63F-SF0750-6.00MT|Y
01|95603|44|1|H63F-SF0750-3.00MT|Y
01|95605|1|1|BMT55; ER11; SPECIAL U TOOL; L=81mm; L1=101mm;|Y
01|95605|1|2|1:2 GEAR RATIO; n1=3750RPM n2=7500RPM; MAX 10Nm;|Y
01|95605|1|3|EXTERNAL COOLANT|Y
01|95605|1|4|BEFORE ORDER WE'LL VERIFY TOOL TO PRINT DRAWINGS|Y
01|95605|3|1|SAME DISCOUNT AS ABOVE. DISCOUNT FOR MULTIPLE TOOLS|Y
01|95611|1|1|Reference RGA#TOR-52026|Y
01|95611|1|2|NCAT40-C3/4-70UG-IDU|N
01|95612|1|1|Non-Returnable Non-Cancellable|Y
01|95612|3|1|Net pricing Non-Returnable Non-cancellable|Y
01|95612|4|1|Net pricing Non-Returnable Non-cancellable|Y
01|95624|1|1|320MM rotary table with special rust proof coating.|Y
01|95631|1|1|Tooling Certificate #20880-1140-030918|Y
01|95658|1|1|$2000 Tooling Certificate at No Additional Cost|Y
01|95658|1|2|Originally quoted as part of Q#90961 which includes|Y
01|95658|1|3|rotary table parts Walden is processing|Y
01|95661|1|1|Includes Haas Motors and Cable Set|Y
01|95661|2|1|Complimentary Tooling Certificate w/5AX Table Purchase|Y
01|95670|1|1|Reference RGA#TOR-52059|Y
01|95670|1|2|S3/4-UMTB Touch point seems to have broken|N
01|95693|1|1|SS20-TG3C-200|Y
01|95696|1|1|Reference RGA# TAR-51940|Y
01|95696|1|2|CNCZ201LFA s/n: 8163|N
01|95701|1|1|Preference RGA# TAR-51880|Y
01|95701|1|2|NSVZ180 s/n: 3052|N
01|95710|1|1|Reference RGA# TAR-51939|Y
01|95710|1|2|CNCZ201LSA s/n: 8070|N
01|95721|1|1|CAT40-DJ3-90A DJ Boring Bar with 4 bits included.|Y
01|95721|2|1|CAT40-DJ3-90A-BD No bits included.|Y
01|95746|1|2|b/o due mid July|Y
01|95758|1|1|SK25-25.5|Y
01|95758|2|1|SK25-25.5A|Y
01|95759|1|1|Inspection fee for CNC201LA21 s/n: 8544|Y
01|95759|1|2|Reference RGA# TAR-52036|Y
01|95759|1|3|All alarms have been cleared backlash tested/adjusted|Y
01|95759|1|4|and oil replaced.|Y
01|95764|2|1|Includes external cables interface cables fiber optic|Y
01|95764|2|2|cable communications cable battery short bar|Y
01|95764|2|3|travel labor expenses|Y
01|95768|1|1|Reference RGA# TAR-51773|Y
01|95768|1|2|5AX-130ZA s/n: 1770|N
01|95773|4|1|Quoted as NET pricing|Y
01|95773|4|2|MNL12-ER32X-OFF-ICE|Y
01|95774|4|1|Quoted as NET pricing|Y
01|95774|4|2|MNL12-SK20X-OFF-ICE|Y
01|95779|4|1|CABLE SET FOR ROBODRILL|Y
01|95814|4|1|Installation cables (length must be defined prior to|Y
01|95814|4|2|order acceptance)|Y
01|95819|3|1|Schunk KPS-160 Vise with STR-S Jaws and Custom Adapter|Y
01|95836|1|1|8112-1188-042318|Y
01|95842|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|95842|13|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|95842|14|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|95855|2|1|SAME AS S/N 15046|Y
01|95866|1|1|Customer has declined the repairs on Quote# 88289.|Y
01|95866|1|2|Inspection fee of $350.00 net to be assessed.|Y
01|95866|1|3|CNC180ZA s/n: 20726T to be returned disassembled.|Y
01|95902|3|1|Includes interface cables external cables drive unit|Y
01|95902|3|2|labor travel expenses|Y
01|95902|3|4|Ladder/Software is the responsibility of Campat|Y
01|95913|1|1|BT45 Taper Shank 5/8 Hole Diam Basic Shrink Fit Tool|Y
01|95913|1|2|BT45-SF0625-6.12CP.Order will be non-cancelable/return|Y
01|95913|2|1|BT45 Taper Shank 5/8 Hole Diam Basic Shrink Fit Tool|Y
01|95913|2|2|BT45-SF0625-6.12CP.Order will be non-cancelable/return|Y
01|95913|3|1|BT45 Taper Shank 5/8 Hole Diam Basic Shrink Fit Tool|Y
01|95913|3|2|BT45-SF0625-6.12CP.Order will be non-cancelable/return|Y
01|95937|3|1|External Power & Feedback Cables (2 Axis)|Y
01|95937|4|1|Machine Data Sheets Must Be Reviewed Prior To Order|Y
01|95937|4|2|Ladder Modifications May Be Required|Y
01|95937|4|3|Workholding Not Included in Quotation|Y
01|95937|6|1|$2000 Tooling Certificate - Included at No Cost|Y
01|95949|1|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|95953|2|1|Glass scale feedback on tilt axis|Y
01|95963|1|1|Price reflects net charge each|Y
01|95971|2|1|Drive external cables internal cables|Y
01|95971|2|2|fiber optic cables short bar and Fanuc|Y
01|95971|2|3|battery.|Y
01|95971|5|1|Drive external cables internal cables|Y
01|95971|5|2|fiber optic cables short bar and Fanuc|Y
01|95971|5|3|battery.|Y
01|95991|1|1|Non-returnable Non-cancelable|Y
01|95994|1|1|Model# NBT40-HC12-90|Y
01|95994|1|2|Dual Contact BT40 12mm Hyd. Chuck GL 90|Y
01|95994|2|1|Reducer 12mm to 4mm.|Y
01|95997|3|1|Actual Part number: CAT50-SK16-105U-J-IDU w/Coolant Nut|Y
01|95997|3|2|installed prior to shipping|Y
01|95997|3|3|Price quoted as YOUR NET COST with Coolant Nut included|Y
01|95997|4|1|To be installed on above holder prior to shipping|Y
01|95998|1|1|Shrink Fit Extension Straight Shank Dia 3mm|Y
01|95998|1|2|Special Order. Unit Price Each.|Y
01|95998|2|1|Special Order. Unit Price Each.|Y
01|95998|2|2|Shrink Fit Extension Straight Shank Dia 3mm|Y
01|95998|3|1|Special Order. Unit Price Each.|Y
01|95998|3|2|Shrink Fit Extension Straight Shank Dia 3mm|Y
01|96000|2|1|Installation includes: Dual axis drive unit short bar|Y
01|96000|2|2|fiber optic cables communications cables bulkhead|Y
01|96000|2|3|cables external cables service time and travel.|Y
01|96009|1|1|H037M5 N-1650 (Repl. for H0275M5 N719)|Y
01|96009|1|2|Quoted as Net pricing non-returnable non-cancelable|Y
01|96057|1|1|Tool Certificate # 20880-1130-022218|Y
01|96066|1|1|5 PC PRICE|Y
01|96066|1|2|Non-returnable Non-cancelable|Y
01|96066|2|1|Non-returnable Non-cancelable|Y
01|96066|2|2|10 PC PRICE|Y
01|96076|1|1|on quote file for 135 ea|Y
01|96087|1|1|IT40-NPU13-130|Y
01|96093|1|1|Price is reflective of one time test value|Y
01|96099|1|1|Reference RGA# TAR-51875|Y
01|96099|1|2|Quoting reassembly of TAT-250 s/n: UNK|Y
01|96115|2|1|Non-returnable Non-cancelable|Y
01|96193|13|1|SKG-15H Back-up Screw (Coolant) for CAT50-SK13-105U-IDU|Y
01|96212|1|1|100MM High Speed four spindle table with Haas motor &|Y
01|96212|1|2|cable set.|Y
01|96226|1|1|CAT40-DJ3-90A BORING KIT|Y
01|96230|1|1|Torque: 35 Nm|Y
01|96230|4|1|ER40 capacity: 4-26mm/ 5/32-1|Y
01|96230|4|2|5000rpm|Y
01|96230|4|3|**Advantage over the AHC: this unit has 150Nm Torque|Y
01|96230|4|4|**You will be able to use existing position block by|Y
01|96230|4|5|adding a shim plate.|Y
01|96231|3|1|Installation includes: drive unit short bar fiber|Y
01|96231|3|2|optic cables communication cables bulk head cable|Y
01|96231|3|3|set external cable set parameter changes service|Y
01|96231|3|4|time and travel|Y
01|96237|3|1|Lyndex-Nikken to make block.|Y
01|96237|3|2|Delivery is from receipt of spindle drawing confirm.|Y
01|96237|3|3|*Net prices|Y
01|96264|1|1|Warranty repair of CNC601 s/n: 6249|Y
01|96264|1|2|Reference RGA# TAR-52074|Y
01|96271|1|1|Includes Haas Motors & Cable Set|Y
01|96271|1|2|This Package is based on a 6 month consignment|Y
01|96287|4|1|NET PRICE|Y
01|96322|3|1|This set includes 3 pieces of each: #12 Base Jaw|Y
01|96322|3|2|#13 Key and #31 Boltfor Howa Chuck HO18M.|Y
01|96332|3|1|1/2-20UNF w/ Coolant Through Hole|Y
01|96332|3|2|Unit Price Each. Special Order.|Y
01|96332|4|1|5/8-18UNF w/ Coolant Through Hole|Y
01|96332|4|2|Unit Price Each. Special Order.|Y
01|96332|5|1|Balancing G2.5 18000rpm.|Y
01|96339|2|1|*qty break pricing|Y
01|96353|1|1|Morse Taper MT3 Milling chuck 20mm|Y
01|96354|2|1|*not avail in double|Y
01|96373|1|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|96373|1|2|4 PCS AVAIL 8/31 + delivery|Y
01|96373|1|3|4 PCS AVAIL 20 WKS + delivery|Y
01|96373|2|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|96373|3|1|FRT DIRECT VIA AIR EST $2200/PC|Y
01|96373|4|1|FRT DIRECT VIA BOAT EST $700.00/PC|Y
01|96375|3|1|Quoted at net price.|Y
01|96376|1|1|Stock showing at factory|Y
01|96377|3|1|Master Jaws for HW-24C-OS-R1775   #12 parts|Y
01|96377|5|1|Wedge for HW-24C-OS-R1775  #4 parts|Y
01|96383|1|1|We may ship today of PO rcvd by 12:00 central|Y
01|96384|1|1|Reference RGA# TAR-51773|Y
01|96384|1|2|5AX-130ZA s/n: 1770|Y
01|96387|6|1|COLLET CHUCK TO BE DEAD LENGTH 5C|Y
01|96401|1|1|IT40-NPU13-130|Y
01|96410|7|1|*Coolant cap for SK13-6.5|Y
01|96410|11|1|*Disc wrench for SKJ16-1/4C|Y
01|96410|12|1|*wrench for C6-SK13-90|Y
01|96412|2|1|Includes labor travel expenses for installation of|Y
01|96412|2|2|rotary table using existing interface components|Y
01|96414|1|1|Coolant Tube Threads / WITH manual clamp|Y
01|96414|1|2|holes/ Bore Depth = 43mm|Y
01|96414|3|1|No Coolant Tube Threads. ***If we put in coolant tube|Y
01|96414|3|2|threads it will shorten bore from 56mm to 43mm. / WITH|Y
01|96414|3|3|manual clamp holes|Y
01|96415|1|1|All bearings seals & o-rings for Rotary side.|Y
01|96415|1|2|Includes labor charges.|Y
01|96415|2|1|Includes worm wheel and worm screw for rotary axis.|Y
01|96415|3|1|Re-Installation of customer's 5AX-130FA-M once repairs|Y
01|96415|3|2|have been completed.|Y
01|96416|2|1|***Non Cancelable Non-Returnable***|Y
01|96416|9|1|***Non-Cancelable Non-Returnable***|Y
01|96416|12|1|Collet Nut Wrench|Y
01|96416|13|1|Spindle Wrench|Y
01|96416|14|1|*delivery is upon receipt of spindle drawing confi|Y
01|96417|1|1|All bearings seals & o-rings for both axes.|Y
01|96417|1|2|Includes labor charges.|Y
01|96417|2|1|Includes worm wheel and worm screw for both axes.|Y
01|96417|3|1|Re-Installation of customer's 5AX-130FA-M once repairs|Y
01|96417|3|2|have been completed.|Y
01|96463|1|1|Alps #SS20-ECH7-45|Y
01|96463|1|2|Quoted at NET price.|Y
01|96469|1|1|Reference RGA# TOR-52010|Y
01|96469|1|2|Repair of customer's SF-START2-UNIT-200 s/n: 2J017|Y
01|96469|2|1|Labor to disassemble unit re-wire re-assemble and|Y
01|96469|2|2|test.|Y
01|96469|2|3|Unit is not working fine.|Y
01|96474|1|1|Reference RGA# TOR-52108|Y
01|96474|1|2|Repair of customer's CAT40-UMT200UH|Y
01|96482|1|1|Reference RGA# LVR-52107|Y
01|96482|1|2|OKEX-ER32X-ICE s/n: 5166501 Mimatic# 167718|Y
01|96482|2|1|ER Spindle is worn must be re-chromed and ground.|Y
01|96482|2|2|Internal coolant sealing bushings and sealing thread|Y
01|96482|2|3|ring are damaged these must be replaced.|Y
01|96482|2|4|Bearings seals and o-rings are worn must be replaced.|Y
01|96490|1|1|Reference RGA# TAR-52011|Y
01|96490|1|2|CNCZ180LSA3 s/n: 10504|N
01|96496|1|1|net price per unit|Y
01|96496|1|2|special order no cancelable no refundable|Y
01|96511|2|1|Missy This is the end mill holder we discussed.|Y
01|96511|2|2|It also has a 6.0 gage length but is balanced for|Y
01|96511|2|3|hi-speed. We no longer stock these and are making room|Y
01|96511|2|4|in the warehouse. That is why the price is lower.|Y
01|96511|3|1|Pending price & delivery.|Y
01|96530|2|1|External Cables are included.|Y
01|96530|2|2|Hydraulic 5C Clamping System Installed.|Y
01|96530|5|1|External Cables are included.|Y
01|96530|5|2|Hydraulic 5C Clamping System Installed.|Y
01|96536|1|1|Reference RGA#TOR-52061|Y
01|96536|1|2|CAT40-C3/4-105U|N
01|96539|1|1|Used-320 hrs. of use|Y
01|96539|1|2|Sold As-Is|Y
01|96539|2|1|Part # RKT-8400S    Set of (3) Steel Pie Jaw x1|Y
01|96539|2|2|Part # KT-80HJ2-U   Set of (3) 3 Step Hard Ja x1|Y
01|96539|2|3|Part # KT-8EH       Set of (3) 4 Soft Jaws x1|Y
01|96539|2|4|Part # KT-8MH       Set of (3) 3 Soft Jaws x1|Y
01|96539|2|5|Part # KT-8         Set of (3) 2 Soft Jaws x7|Y
01|96539|3|1|Part # JBR-08 - 8 Jaw Boring Ring  x1|Y
01|96539|4|1|Draw Tube Threaded Adapter: M60x 2mm|Y
01|96539|4|2|or L&N can provide blank draw tube adapter|Y
01|96545|2|1|Includes:|Y
01|96545|2|2|Amplifier for Direc Drive Servo Motor|Y
01|96545|2|3|Power Cable|Y
01|96545|2|4|Feedback Cable|Y
01|96545|2|5|Fiber Optic and additional connectors|Y
01|96545|2|6|Specialist visit @ Guadalajara 2 days|Y
01|96552|1|1|Reference RGA# TAR-52100|Y
01|96552|1|2|CNC180FA s/n:17222|N
01|96576|1|1|This part number replaces CAT40-SZF16-120U|Y
01|96578|1|1|BT40-SF6-160MT-IDI|Y
01|96578|2|1|BT40-SF12-160MT-IDI|Y
01|96586|2|1|i have 4 pcs on hold for APT|Y
01|96596|1|1|Reference RGA# TAR-52119|Y
01|96596|1|2|CNC601FA s/n: 6015|N
01|96603|1|1|Quote for make replacement cable in house.|Y
01|96603|1|2|1 Week delivery|Y
01|96623|1|1|Mazak #53308020200|Y
01|96623|2|1|Mazak #53308020600|Y
01|96635|6|1|2 systems are quoted above.System 1 (lines 1-3) or|Y
01|96635|6|2|System 2 (lines 4-5)|Y
01|96639|17|1|Non standard stock special item.I increased discount to|Y
01|96639|17|2|match pricing of other items|Y
01|96650|1|1|Quoted as NET pricing Nonreturnable non-cancelable|Y
01|96650|1|2|Price NOT including freight|Y
01|96650|2|1|Quoted as NET pricing Non-returnable Noncancelable|Y
01|96650|2|2|Price NOT including freight|Y
01|96650|3|1|Ship direct via AIR|Y
01|96650|4|1|Ship Direct via Boat|Y
01|96652|1|1|1 YR WARRANTY|Y
01|96662|1|1|Reference RGA# TAR-52083|Y
01|96662|1|2|5AX-201YA s/n:5112|N
01|96670|2|1|Installed on H63A(80) holders at factory|Y
01|96670|3|1|Installed on H63A(80) holders at factory|Y
01|96670|7|1|Installed on H63A(80) holders at factory|Y
01|96670|8|1|Installed on H63A(80) holders at factory|Y
01|96687|1|1|ICE= Internal & External Coolant. Can also be ran dry|Y
01|96687|1|2|24/7.|Y
01|96687|4|1|Internal Coolant Only must be run with coolant at|Y
01|96687|4|2|all times.|Y
01|96687|5|1|External Coolant Only|Y
01|96689|1|1|Standard discount is 20%.|Y
01|96689|2|1|Wrench is free with purchase of toolholder.|Y
01|96689|3|1|Standard discount is 20%.|Y
01|96689|4|1|Standard discount is 20%.|Y
01|96689|5|1|Standard discount is 20%.|Y
01|96689|6|1|Standard discount 30%|Y
01|96689|7|1|Wrench is free with purchase of toolholder.|Y
01|96691|1|1|NCAT40-SF10-5.12CP|Y
01|96691|1|2|Taper Plus CAT40 10mm Shrink Fit holder w 5.12g.l. w|Y
01|96691|1|3|coolant ports.|Y
01|96691|2|1|NCAT40-SF18-5.12CP|Y
01|96691|2|2|Taper Plus CAT40 18mm Shrink Fit holder w 5.12 g.l. w|Y
01|96691|2|3|coolant ports|Y
01|96691|3|1|NCAT40-SF25-5.12CP|Y
01|96691|3|2|Taper Plus CAT40 25mm Shrink Fit holder w 5.12 g.l. w|Y
01|96691|3|3|coolant ports|Y
01|96693|1|1|Standard discount is 20%.|Y
01|96693|4|1|Collet is free with purchase of live tool.|Y
01|96693|5|1|Collet is free with purchase of live tool.|Y
01|96698|1|1|QUOTED WITH SIEMENS MOTOR INSTALLED|Y
01|96698|2|1|CLAMP/UNCLAMP SIGNAL CABLES|Y
01|96698|2|2|WIRING DIAGRAM WILL NEED TO BE PROVIDED.|Y
01|96698|3|1|AIR PURGE SYSTEM|Y
01|96701|4|1|L&N to make custom block.|Y
01|96701|4|2|Delivery is from confirmation of spindle drawing|Y
01|96701|15|1|L&N to make custom block.|Y
01|96701|15|2|Delivery is from confirmation of spindle drawing|Y
01|96701|26|1|L&N to make custom block.|Y
01|96701|26|2|Delivery is from confirmation of spindle drawing|Y
01|96704|2|1|INstallation includes: Drive unit short bar fiber|Y
01|96704|2|2|optic cable communications cable bulkhead cables|Y
01|96704|2|3|external cables parameter changes service time and|Y
01|96704|2|4|travel.|Y
01|96715|1|1|Quote to convert MZQT47-ER16-AD-SUB s/n: 54757-01|Y
01|96715|1|2|from 1:1 gear ratio to a 1:4 gear ration.|Y
01|96715|1|3|Delivery will be 2-3 Weeks from receipt of approval|Y
01|96715|1|4|to proceed.|Y
01|96715|1|5|Modification quoted as a NET Charge.|Y
01|96717|1|1|R8 Tap Holder (T/C type)|Y
01|96717|1|2|Special order. Unit Price Each. Minimum Order Qty. 10|Y
01|96719|2|1|RT Installation @ Samot Silao included. >>Two Events<<|Y
01|96719|3|1|Hydraulic 5C Clamping System for CNCZ100-4W-120YA-M|Y
01|96719|3|2|Installation on table included.|Y
01|96719|3|3|TIR 0.012mm (0.0005)|Y
01|96724|1|1|Please note your PF-2 must be calibrated once the|Y
01|96724|1|2|stylus has been replaced.|Y
01|96732|1|1|Comes with Chuck Adapter Plate and Hardware|Y
01|96732|1|2|Can be used on CNC180 CNC202Please double check the|Y
01|96732|1|3|adapter will work with the customer's machine|Y
01|96734|1|1|NO WORKHOLDING FIXTURE QUOTED. PROPER FIT TO MACHINE|Y
01|96734|1|2|NEEDS CONFIRMATION. DNM5700 DOOSAN W/FANUC CONTROL|Y
01|96734|2|1|Installation includes: Drive unit short bar fiber|Y
01|96734|2|2|optic cable communications cable bu;lkhead cables|Y
01|96734|2|3|external cables parameter changes service time and|Y
01|96734|2|4|travel.|Y
01|96745|4|1|Includes Installation Drive Units Bulkhead Cables|Y
01|96745|4|2|External Cables Service Time & Travel|Y
01|96760|1|1|R8 Tap Holder (T/C type)|Y
01|96760|1|2|Special order. Unit Price Each. Minimum Order Qty. 10|Y
01|96760|6|1|SES3-16.0X12.5|Y
01|96760|6|2|#3 TorqCon Tap Collet .630x.492 16.0X12.5 M227/8|Y
01|96778|1|1|5/8-11 Thread|Y
01|96796|22|1|41111|Y
01|96803|1|1|Reference RGA#TOR-52138|Y
01|96803|1|2|BT40-MOC1.1/4-160 s/n:Mhe-03002|N
01|96803|9|1|spindle is severely worn must be replated and reground.|Y
01|96803|9|2|Delivery will be in 2 weeks.|Y
01|96812|13|1|MNL12-CAPTO4X-10K|Y
01|96812|13|2|Pricing TBA|Y
01|96812|14|1|MNL12-CAPTO4Z-10K|Y
01|96812|14|2|Pricing TBA|Y
01|96823|1|1|Reference RGA# TAR-52085|Y
01|96823|1|2|CNC180AA21 s/n: 17210|N
01|96854|1|1|Reference RGA#TAR-52159|Y
01|96854|1|2|CNC201 s/n:1212|N
01|96856|1|1|CNC1201FAA21|Y
01|96876|1|1|This item replaces HSK63A-MMC8C-107-A.This is just a|Y
01|96876|1|2|part # change from 'A' to 'D' Both are draw type|Y
01|96879|1|1|Onetime additional discount provided for proving holder|Y
01|96879|1|2|Once tooling is inserted into spindle it cannot|Y
01|96879|1|3|be returned.|Y
01|96879|6|1|Additional discount provided to test holder|Y
01|96879|6|2|Once holder is inserted into spindle it cannot|Y
01|96879|6|3|be returned|Y
01|96879|13|1|Onetime additional discount provided for proving holder|Y
01|96879|13|2|Once tooling is inserted into spindle it cannot|Y
01|96879|13|3|be returned.|Y
01|96884|3|1|*non-coolant|Y
01|96901|1|1|CNC401TFA (No Motor)|Y
01|96901|1|2|8+1 R.Joint|Y
01|96901|1|3|Modified Face Plate|Y
01|96901|1|4|spare table for the previous RT of S/R#6681|Y
01|96902|1|1|I LEFT MY TRUNK STOCK HOLDER WITH THEM.|Y
01|96902|1|2|THIS HOLDER NEEDS TO BE SHIPPED TO MY OFFICE|Y
01|96903|3|1|With Riser to meet CNC-260 Centerheight|Y
01|96903|7|1|$ 1000 LIST PRICE TOOL CERTIFICATE AT NO CHARGE|Y
01|96905|1|1|All Parts are valued at onetime testing discount|Y
01|96915|1|1|Quoted at Net Price|Y
01|96917|1|1|NC5008-0013-9.00|Y
01|96917|2|1|NC5008-0013-9.00|Y
01|96917|3|1|NC5008-0013-9.00|Y
01|96924|1|1|S.RCC-43 - cartridge|Y
01|96924|1|2|Delv = 2 sets stock in Japan & bal of 1 set = 3 weeks|Y
01|96939|4|1|Includes drive unit interface cables external cables|Y
01|96939|4|2|communications cable short bar labor travel expense|Y
01|96941|2|1|Cable Set - Length to be Determined|Y
01|96941|3|1|Installation|Y
01|96941|3|2|Includes Hardware Labor Transit Time|Y
01|96963|3|1|***Optional***|Y
01|96963|3|2|If table is prepped for hydraulic brake|Y
01|96963|4|1|Installation includes: drive unit short bar fiber|Y
01|96963|4|2|optic cables communication cables bulk head cable|Y
01|96963|4|3|set external cable set parameter changes service|Y
01|96963|4|4|time and travel|Y
01|96971|3|1|Includes Installation Drive Units Bulkhead Cables|Y
01|96971|3|2|External Cables Service Time & Travel|Y
01|96971|4|1|$1000.00 Complimentary Tooling Certificate with|Y
01|96971|4|2|purchase of Lyndex-Nikken 5AX-250FA-M Rotary Table|Y
01|96982|1|1|Includes Haas Motors & Cable Set|Y
01|96986|1|1|List price for 1~2 heads.|Y
01|96992|3|1|Master Jaws for HW-24C-OS-R1775   #12 parts|Y
01|96992|5|1|Wedge for HW-24C-OS-R1775  #4 parts|Y
01|96996|3|1|MRAM-ER11-166|Y
01|96996|3|2|Pricing as follows: 1 Unit = $7717; 2 Units = $5717|Y
01|96996|3|3|3 Units = $5051|Y
01|96996|3|4|Head Length will be extended by 51mm|Y
01|96996|5|1|MRAM-ER16-166|Y
01|96996|5|2|Pricing as follows: 1 Unit = $8245; 2 Units = $6138|Y
01|96996|5|3|3 Units = $5432|Y
01|96996|5|4|Head Length Extended by 51mm|Y
01|97003|1|1|Price is for 1 or 2 heads.|Y
01|97010|2|1|Modification of NC5021-1250-6.00 with coolant|Y
01|97010|2|2|through the sides exiting the face|Y
01|97014|1|1|90mm Gage Length|Y
01|97037|1|1|Review load/unload by ATC|Y
01|97037|2|1|Customized Positioning Block|Y
01|97043|1|1|Value reflective of one time test pricing|Y
01|97043|1|2|Cannot be returned once inserted into spindle|Y
01|97043|10|1|Please Note: This is a non standard stock item. Once|Y
01|97043|10|2|a purchase order is placed it cannot be cancelled|Y
01|97043|10|3|or returned.|Y
01|97057|1|1|HFO TAMPA TO SUPPLY MOTOR AND CABLES|Y
01|97057|1|2|TABLE AND TAILSTOCK IN STOCK|Y
01|97057|5|1|HFO TAMPA TO SUPPLY MOTORS AND CABLES|Y
01|97057|9|1|HFO TAMPA TO SUPPLY CABLES AND MOTORS|Y
01|97059|3|1|FULL 4TH AXIS INSTALLATION INCLUDES DRIVE SOLENOID|Y
01|97059|3|2|CABLES CONNECTORS EXTERNAL AND INTERNAL CABLES|Y
01|97059|3|3|TRAVEL AND LABOR|Y
01|97066|1|1|BMT75-ER32X-ICE-OST BMT75;ER32Straight;L-109mmD-75mm|Y
01|97066|1|2|1:1 Gear ratio; 6000RPM; max 100Nm torque|Y
01|97066|1|3|Direction rotation not reversal.IntC & ExtC; p=1015PSI|Y
01|97066|1|4|Old Version Sword Drive Tang Ref drw 00032615|Y
01|97066|2|1|BMT75-ER32X-ICE-OST see description above|Y
01|97066|3|1|BMT75-ER32Z-ICE-OST;BMT75;ER32;90 Deg;L-109mm;D=75mm;L1|Y
01|97066|3|2|1:1 Gear ratio; 6000RPM; max 80Nm torque|Y
01|97066|3|3|Direction rotation is reversal;IntC & ExtC; p= 1015PSI|Y
01|97066|3|4|Old version sword drive tangref drw #00032795|Y
01|97066|4|1|BMT75-ER32Z-ICE-OST see description above|Y
01|97066|5|1|BMT85-ER32X-ICE-OST;ER32;Straight;L140mm;D=85mm|Y
01|97066|5|2|1:1 Gear ratio; 6500RPM; max 100Nm torque|Y
01|97066|5|3|Direction rotation not reversal.IntC & ExtC; p= 1015PSI|Y
01|97066|5|4|Old Version Sword Drive Tang Ref drw 00049250|Y
01|97066|6|1|BMT85-ER32X-ICE-OST see description above|Y
01|97066|7|1|BMT85-ER32Z-ICE-OSTBMT85; ER32 90deg;L=140mmD=85mm|Y
01|97066|7|2|1:1 Gear ratio; 6500RPM; max 50Nm torque|Y
01|97066|7|3|Direction rotation is reversal.IntC & ExtC; p= 1015PSI|Y
01|97066|7|4|Old version sword drive tang. Ref drw #00033078 or|Y
01|97066|7|5|00049248|Y
01|97066|8|1|BMT85-ER32Z-ICE-OST see description above|Y
01|97072|1|1|SKJ10-2C  SK10 Coolant Cap 2mm|Y
01|97097|1|1|Holder installed with PS-N63AE retention knob|Y
01|97097|1|2|at factory.|Y
01|97099|2|1|5AX-201 SN:4335|Y
01|97108|1|1|Reference RGA# LVR-52139|Y
01|97108|1|2|MNL12HT-CAPTO6X s/n: A0007 & A0009|Y
01|97108|1|3|Units were clamped at incorrect drawbar position.|Y
01|97108|2|1|Draw Bar Segment O-Ring Collar Segment Holder|Y
01|97108|2|2|Collar & springs must all be replaced.  Labor is|Y
01|97108|2|3|included.|Y
01|97113|1|1|Installed with pull stud PS-N63VE at factory|Y
01|97113|2|1|Installed on NC5-63-SK16C-105 at factory|Y
01|97115|3|1|External Power & Feedback Cables (2 Axis)|Y
01|97144|1|1|Quote for Service Call performed on 5AX-201SA-BR2|Y
01|97144|1|2|s/n: 4335 by Pedro Suarez on June 8th 2018|Y
01|97144|2|1|Transit Time: 10.33hrs x $60/hr = $619.80|Y
01|97144|2|2|Gas & Toll Booths: $135.00|Y
01|97144|2|3|Meals per Day: 1 Day x $35.00/day = $35.00|Y
01|97146|2|1|Renishaw scale + mounting kit delivery is pending due|Y
01|97146|2|2|to time needed for engineering the mounting design|Y
01|97150|3|1|124641|Y
01|97150|6|1|124877|Y
01|97156|1|1|Tooling Certificate Number: 8112-1180-041718|Y
01|97159|1|1|Reference RGA#LVR-52129|Y
01|97159|1|2|Repair of customer's MNL12-ER25Z-MSD s/n: A0007|Y
01|97159|1|3|(Alps#MSA01-6L000)|Y
01|97159|2|1|Spindles gears bearings O-rings & seals to be|Y
01|97159|2|2|replaced. There is a possibility that spindles and|Y
01|97159|2|3|gears will not be needed to repair; howeverwe will not|Y
01|97159|2|4|be able to tell if they will be needed until assembled|Y
01|97159|2|5|and test ran. If they will be needed the price will be|Y
01|97159|2|6|$2370.37|Y
01|97160|1|1|Net price reflects modification below:|Y
01|97182|1|1|(1) PC PRICING|Y
01|97182|1|2|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|97182|2|1|(2) PC PRICING|Y
01|97182|2|2|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|97189|5|1|Quoted at Net price. Please note delivery is after|Y
01|97189|5|2|technical clairification.|Y
01|97193|1|1|NCAT40-HC20-90 2 Lock Taper Plus  Hydraulic Chuck|Y
01|97193|1|2|20mm X 90mm Gage|Y
01|97193|1|3|Quoted as Net price.|Y
01|97193|2|1|NCAT40-HC20-80.5 2Lock TaperPlus NCAT40 Hydraulic Chuck|Y
01|97193|2|2|Quoted at Net price. Please note: Price is less money|Y
01|97193|2|3|because 80.5mm gage length is a standard.|Y
01|97203|1|1|H63A(80)-HC12-3.898 Hydraulic Chuck per UNV#444|Y
01|97203|2|1|H63A(80)-HC12-3.898 Hydraulic Chuck per UNV#444|Y
01|97203|3|1|H63A(80)-HC12-3.898 Hydraulic Chuck per UNV#444|Y
01|97204|1|1|H63A(80)-HC12-3.898 Hydraulic Chuck per UNV#444|Y
01|97204|2|1|H63A(80)-HC12-3.898 Hydraulic Chuck per UNV#444|Y
01|97204|3|1|H63A(80)-HC12-3.898 Hydraulic Chuck per UNV#444|Y
01|97211|1|1|CAT40-VC13-90U-IDI-DIN - rebalanced at 20K rpm @ G2.5|Y
01|97217|1|1|2-stock/40pc due end Sept.|Y
01|97217|2|1|4 pcs stock 10 on order due end Sept.|Y
01|97217|3|1|10 stock/20 pcs due end Sept.|Y
01|97217|4|1|8-pcs stock / 10 due end Sept.|Y
01|97217|5|1|11 pcs stock / 30 due end Sept.|Y
01|97217|6|1|9 pcs stock / Balance 10 Weeks|Y
01|97217|7|1|Zero Stock eta to L-N end Sept.|Y
01|97217|8|1|15-pcs stock|Y
01|97239|1|1|Reference RGA# TAR-52102|Y
01|97239|1|2|5AX-201 s/n:3693|N
01|97242|5|1|ABOVE P/N REPLACES TCD-37206|Y
01|97265|8|1|Alternate for TG50 Collet chuck|Y
01|97265|9|1|ETA due to Vendor on 3-week summer break|Y
01|97268|1|1|Tooling Certificate Number: 8112-1180-041718|Y
01|97272|1|1|No motor|Y
01|97272|1|2|include TCD-81037 (8+1P Built in)|Y
01|97272|1|3|Special itme|Y
01|97272|1|4|No cancel No refund allowed upon PO|Y
01|97272|2|1|TAT-321N (4+1 RJ)|Y
01|97272|2|2|Special itme|Y
01|97272|2|3|No cancel No refund allow upon PO|Y
01|97283|2|1|This has a 2.0 gage length.|Y
01|97283|6|1|This has a 2.50 gage length.|Y
01|97288|5|1|If delivery is issue I can offer E11-078>>2.0mm collet|Y
01|97288|5|2|This will hold a 1/16 collet. $37.00 less 35% stock.|Y
01|97295|1|1|*Qualifies for Core-Buyback Program*|Y
01|97301|4|1|EXTERNAL CABLE SET|Y
01|97301|6|1|$ 1000 LIST PRICE TOOL CERT AT NO CHARGE|Y
01|97301|8|1|COMPLETE 4TH AXIS INSTALLATION. SERVO MOTOR ADDITIONAL|Y
01|97301|8|2|AXIS DRIVE INTERNAL CABLES FIBRE OPTICS ALL|Y
01|97301|8|3|CONNECTORS TRAVEL AND LABOR|Y
01|97305|5|1|EXTERNAL CABLE SET|Y
01|97305|7|1|$ 1000 LIST PRICE TOOL CERT AT NO CHARGE|Y
01|97305|9|1|COMPLETE 4TH AXIS INSTALLATION. SERVO MOTOR ADDITIONAL|Y
01|97305|9|2|AXIS DRIVE INTERNAL CABLES FIBRE OPTICS ALL|Y
01|97305|9|3|CONNECTORS TRAVEL AND LABOR|Y
01|97325|6|1|$ 1000 LIST PRICE TOOL CERTIFICATE INCLUDED|Y
01|97348|6|1|INSTALLATION FEE INCLUDES THE FOLLOWING ITEMS:|Y
01|97348|6|2|FANUC ROTARY TABLE MOTOR 4TH AXIS SERVO AMPLIFIER|Y
01|97348|6|3|PNEUMATIC VALVE BULKHEAD CABLES AND WIRING.|Y
01|97348|6|4|ALSO INCLUDED: OEM LADDER MODIFICATIONS FOR PROPER|Y
01|97348|6|5|4TH AXIS OPERATION.|Y
01|97348|6|6|TRAVEL EXPENSES FOR LYNDEC NIKKEN INSTALL TECHNICIAN|Y
01|97348|6|7|IS ALSO INLCUDED.|Y
01|97349|4|1|POWER AND FEEDBACK CABLES INCLUDED AT NO COST|Y
01|97349|6|1|INSTALLATION FEE INCLUDES THE FOLLOWING ITEMS:|Y
01|97349|6|2|FANUC ROTARY TABLE MOTOR 4TH AXIS SERVO AMPLIFIER|Y
01|97349|6|3|PNEUMATIC VALVE BULKHEAD CABLES AND WIRING.|Y
01|97349|6|4|ALSO INCLUDED: OEM LADDER MODIFICATIONS FOR PROPER|Y
01|97349|6|5|4TH AXIS OPERATION.|Y
01|97349|6|6|TRAVEL EXPENSES FOR LYNDEC NIKKEN INSTALL TECHNICIAN|Y
01|97349|6|7|IS ALSO INLCUDED.|Y
01|97356|6|1|Gage Length 2.36|Y
01|97356|32|1|7/64|Y
01|97356|33|1|7/64|Y
01|97356|35|1|9/64|Y
01|97356|37|1|11/64|Y
01|97356|38|1|13/64|Y
01|97356|39|1|15/64|Y
01|97356|41|1|17/64|Y
01|97356|42|1|19/64|Y
01|97356|44|1|21/64|Y
01|97356|46|1|25/64|Y
01|97356|47|1|29/64|Y
01|97356|49|1|31/64|Y
01|97370|1|1|IT40-NPU13-130|Y
01|97381|1|1|Repairof customre's MZQT47-ER32Z-MS s/n: 9767401|Y
01|97381|1|2|(Mimatic# 124638)|Y
01|97381|2|1|Spindle bearings seals and o-rings to be replaced|Y
01|97381|2|2|This is a rough estimate. Final cost will be determined|Y
01|97381|2|3|upon evaluation and repair.|Y
01|97383|2|1|NBT30-SK6c-75P 2Lock TaperPlus NBT30 SK6 Slim Chuck|Y
01|97383|2|2|Coolant High Speed|Y
01|97384|1|1|Nose Dia. 0.75|Y
01|97384|2|1|Nose Dia. 0.75|Y
01|97384|3|1|Nose Dia. 0.79|Y
01|97384|4|1|Nose Dia. 0.87|Y
01|97384|5|1|Nose Dia. 1.38|Y
01|97392|1|1|HW-TN1-15C-HS  Jaw Nut Set (3 pieces)|Y
01|97399|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|97399|1|2|NO WOODEN BOX INCLUDED|Y
01|97404|1|1|Quoted at NET price.|Y
01|97418|3|1|Includes Installation Drive Units Bulkhead Cables|Y
01|97418|3|2|External Cables Service Time & Travel|Y
01|97418|4|1|$1000.00 Complimentary Tooling Certificate for End User|Y
01|97418|4|2|with purchase of 5AX-201MA-M-AB Rotary Table.|Y
01|97429|4|1|*** Brother only ***|Y
01|97429|5|1|*** Haas only ***|Y
01|97434|1|1|Net price each. Only 1 in stock at the factory.|Y
01|97434|2|1|NBT40-SF4-90MT|Y
01|97434|2|2|BT40 4mm Shrink Fit Holder Pre-Balanced Mold Type|Y
01|97436|1|1|Nakamura live 90deg; MI40 1:1 Gear ratio; max 25Nm;|Y
01|97436|1|2|6500RPM; Direction of rotation reversal; Internal and|Y
01|97436|1|3|external coolant; Ref dwg# 00036903|Y
01|97436|2|1|Nakamura live Straight; MI40; 1:1 Gear ratio; max 50Nm|Y
01|97436|2|2|6500RPM; Direction of rotation reversal; Internal and|Y
01|97436|2|3|External coolant; Ref dwg# 00036911|Y
01|97436|3|1|Nakamura live 90deg; ER11; 1:3 Gear ratio; max 5Nm|Y
01|97436|3|2|n1=6000RPM n2=18000RPM; No reversal of rotation|Y
01|97436|3|3|direction; External coolant; Ref dwg# 00031214|Y
01|97436|4|1|Nakamura live Straight; ER11; 1:3 Gear ratio; max 5Nm|Y
01|97436|4|2|n1=6000RPM n2=18000RPM; No reversal of rotation|Y
01|97436|4|3|direction; External coolant; Ref dwg# 00031244|Y
01|97450|4|1|NET price.Non standard stock itemnot cancellable or|Y
01|97450|4|2|returnable once an order is placed|Y
01|97450|5|1|Custom Positioning BlockHardinge/Bridgeport GX1000SP|Y
01|97450|5|2|No additional discount net price|Y
01|97455|5|1|NET Pricing. Non standard stock itemnot cancellable or|Y
01|97455|5|2|returnable once item is ordered|Y
01|97455|6|1|Custom Positioning BlockHardinge/Bridgeport GX1000SP|Y
01|97455|6|2|No additional discount net price|Y
01|97465|2|1|We currently have all but 25/64 50TG Collet.|Y
01|97465|2|2|ETA 1 week after receipt of a purchase order.|Y
01|97474|2|1|Promotional Cooling Unit to be given to the end user|Y
01|97474|2|2|at NO COST|Y
01|97485|1|1|Delivery is 1 week after motor/wiring confirmation|Y
01|97502|1|1|Without motor motor must be provided by Morris or|Y
01|97502|1|2|Enduser|Y
01|97523|85|1|Please Note: Discount reflects purchase of matching|Y
01|97523|85|2|taper holder with each retention knob.|Y
01|97528|2|1|S18-SK6-200-J|Y
01|97548|2|1|Wrench for HSK63A-SK10C-105P|Y
01|97548|4|1|Wrench for HSK63A-C3/4-95G|Y
01|97548|18|1|Wrench for HSK63-TUBE|Y
01|97574|1|1|Special Rotary Table Horizontal Use With scale and rise|Y
01|97574|1|2|Special modification cost included.|Y
01|97574|1|3|Option cables included in A21 controlar.|Y
01|97574|1|4|1-5 units purchase price.|Y
01|97574|2|1|6+1 Rotary Joint|Y
01|97574|2|2|1-5 units purchase price.|Y
01|97574|3|1|PLC|Y
01|97574|4|1|Engineering Fee (Program development & onsite trial fee|Y
01|97574|4|2|as of July 252018. *Travel included.)|Y
01|97584|13|1|No 1-1/4 in 6 gage available|Y
01|97584|28|1|Currently on vendor back order|Y
01|97589|1|1|5AX-201SA-BR2 s/n 4335 on Speedio S1000X1|Y
01|97589|1|2|All Parts and Services included forOverhaul of|Y
01|97589|1|3|Rotation and Tilting Axis|Y
01|97589|1|4|2 days repair 1 days tests 1 day installation|Y
01|97590|2|1|5AX-201 SN:4335|Y
01|97591|1|1|B40RAM-MI50-190-110TP|Y
01|97591|1|2|REF M#170653 (Tapered pin)|Y
01|97603|1|1|Prices reflect one time test pricing|Y
01|97603|2|1|price reflects one time test pricing|Y
01|97608|1|1|Reference RGA# TAR-52176|Y
01|97608|1|2|CNC201YA s/n: 8334|Y
01|97608|3|1|Motor has been replaced backlash adjusted and oil|Y
01|97608|3|2|has been changed.|Y
01|97608|3|3|Customer has declined recommended full evaluation.|N
01|97618|5|1|Promo pertains to part# MZQT47-ER32X only|Y
01|97622|1|1|IN STOCK AND READY TO SHIP...|Y
01|97622|2|1|THIS CHUCK IS A SPECIAL AND WILL BE FACTORY ORDER|Y
01|97627|2|1|Promotional Cooling Unit to be given to the end user|Y
01|97627|2|2|at NO COST|Y
01|97631|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|97631|2|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|97631|3|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|97645|1|1|Reference RGA# TAR-51719|Y
01|97645|1|2|5AX-200II s/n: 1555|N
01|97667|1|1|With PS-N63AE|Y
01|97692|1|1|Reference RGA# TAR-52161|Y
01|97692|1|2|CNC401TFA s/n: 6681|N
01|97692|6|1|CN403T172: Gasket|Y
01|97692|7|1|CN403T174: Gasket|Y
01|97692|8|1|CN322T104: Drain Nipple|Y
01|97694|1|1|Quoted as NET pricing|Y
01|97699|2|1|Installation includes: drive unit short bar fiber|Y
01|97699|2|2|optic cables communication cables bulk head cable|Y
01|97699|2|3|set external cable set parameter changes service|Y
01|97699|2|4|time and travel|Y
01|97703|5|1|w/ BK50BS-A bushing installed inside block|Y
01|97703|6|1|This bushing is installed in block made by L&N|Y
01|97703|6|2|part# MODIFICATION-PB-SP|Y
01|97703|6|3|**Net price Set|Y
01|97708|5|1|BMT65-ER32Z-MS-ICE BMT65 Live ER32 90-Deg 1:1 Z-Axis|Y
01|97708|5|2|Internal Coolant|Y
01|97708|5|3|BMT65-ER32Z-MS-ICE NO QUOTE per Mimatic.|Y
01|97710|1|1|Price is for 3-4 PCS|Y
01|97710|2|1|Price is for 5-9 PCS|Y
01|97710|3|1|Price is for 10+ pcs|Y
01|97727|1|1|AC4-TRX3/4-75 Capto C4 Milling Chuck 3/4 X 75|Y
01|97727|1|2|Alps Part #AC4-TRX19.05-75|Y
01|97747|5|1|Closeout Promotion! All sales are FINAL! 17 pcs. left.|Y
01|97747|5|2|DIN Coolant Flange Do Not Run Coolant through spindle|Y
01|97747|10|1|Closeout Promotion! All sales are FINAL! Only 6 left.|Y
01|97747|10|2|DIN Coolant Flange Do Not Run Coolant through spindle|Y
01|97753|1|1|Pricing reflects onetime test value|Y
01|97760|1|1|Reference RGA# TAR-52230|Y
01|97760|1|2|5AX-130FA-M s/n: 4778|N
01|97766|1|1|Set includes the following: 1-CNCZ180LYA-BR table with|Y
01|97766|1|2|sheet metal divider junction box with main cable set|Y
01|97766|1|4|DISCONTINUED MOTOR/AMP. DISCOUNT MAX 35%|Y
01|97766|1|5|NO TOOL CERTIFICATE OFFERED DUE TO THE ABOVE|Y
01|97777|1|1|Reference RGA# TAR-52162|Y
01|97777|1|2|TAT-400 s/n: 1513|N
01|97791|3|1|Please note: We have exactly 3 holders available.|Y
01|97791|3|2|This item is discontinued.|Y
01|97812|11|1|**Replacement chuck body only|Y
01|97815|1|1|NBT40-FMB25.4-90|Y
01|97815|2|1|NBT40-FMC25.4- 90|Y
01|97815|3|1|NBT40-SMA25.4- 105|Y
01|97831|6|1|*wrench for MNL12-ER32X|Y
01|97831|7|1|*wrench for MNL12-ER32X|Y
01|97841|6|1|Incluye la instalacion de amplificador y electronica|Y
01|97841|6|2|asi como la visita de nuestro especialista en ETRAC|Y
01|97844|1|2|HFO Tampa to supply correct motors|Y
01|97844|1|3|HFO Tampa to supply cables|Y
01|97845|4|1|CENTER HEIGHT 160-180MM|Y
01|97856|1|1|CN602RRJ11007558/3: Center shaft for CNC601FA s/n: 6015|Y
01|97857|6|1|L&N to make position block upon receipt of spindle|Y
01|97857|6|2|drawing info|Y
01|97857|6|3|*net pricing|Y
01|97875|1|1|Service call completed by Kaz on 7/2/18|Y
01|97875|1|2|5AX-130FA-M s/n: 4778|Y
01|97875|2|1|Transit Time: 27.98 hrs x $100/hr = $2798.00|Y
01|97875|2|2|Airfare & Car Rental: $1100.00|Y
01|97875|2|3|Hotel: $260.00|Y
01|97875|2|4|Meals: $50.00/day x3 days(including travel time)= $150|Y
01|97878|1|1|Reference RGA# TAR-52022|Y
01|97878|1|2|5AX-2002FA s/n:2057|N
01|97902|2|1|CCK32-28|Y
01|97902|5|1|CKFN32(1.1/4)-28C|Y
01|97907|1|1|All pricing is reflective of one time test values|Y
01|97908|1|1|All pricing reflects one time test value|Y
01|97915|3|1|Cable Set|Y
01|97917|6|1|1.54 BACK OF HEAD TO COLLET FACE|Y
01|97917|8|1|1.54 BACK OF HEAD TO COLLET FACE|Y
01|97917|15|1|2.322 BACK OF HEAD TO COLLET FACE|Y
01|97917|16|1|2.322 BACK OF HEAD TO COLLET FACE|Y
01|97917|17|1|1.811 BACK OF HEAD TO COLLET FACE|Y
01|97917|18|1|2.46 BACK OF HEAD TO COLLET FACE|Y
01|97920|6|1|Quoted as NET pricing non returnablenon cancelable|Y
01|97920|8|1|CAT40 4mm SF 160 GL|Y
01|97920|8|2|1 PC PRICING|Y
01|97920|8|3|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|97920|9|1|CAT40 4mm SF 160 GL|Y
01|97920|9|2|3 PC PRICING|Y
01|97920|9|3|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|97920|15|1|BT50 4mm SF 160 GL|Y
01|97920|15|2|1 PC Pricing|Y
01|97920|15|3|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|97920|16|1|BT50 4mm SF 160 GL|Y
01|97920|16|2|3 PC pricing|Y
01|97920|16|3|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|97950|1|1|Old par number OKU-L370-X|Y
01|97950|5|1|Old part number OKU-L370MW-DB|Y
01|97954|5|1|Spindle wrench is adjustable cresent wrench|Y
01|97965|13|1|Retention Knob PromoPrice is per holder purchased|Y
01|97977|3|1|H-Type|Y
01|97983|3|1|CAT40-SK16-200U-IDU|Y
01|97983|3|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|97983|4|1|CAT40-SK16-250U-IDU|Y
01|97983|4|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|97988|3|1|NEED ID THREAD|Y
01|97992|1|1|***Consignment prior to purchase***|Y
01|97992|1|2|***Yamazen has received commitment from End User***|Y
01|97996|1|1|All pricing reflects one time test value|Y
01|97996|8|1|Delivery is one to two weeks from Vender|Y
01|98000|1|1|CNCZ105L for Brother TC-S2DN w/B00 CNC Control|Y
01|98000|3|1|For Brother TC-S2DN w/B00 Control|Y
01|98001|1|1|FIT ON DOOSAN CONFIRMED WITH LIMITED TRAVEL PER|Y
01|98001|1|2|LAYOUT GIVEN|Y
01|98001|3|1|THIS TO BE A 5C DEAD LENGTH SYSTEM|Y
01|98001|4|1|Mini manifold and setup INCLUDING LEVER/SWITCH|Y
01|98001|4|2|TO OPERATE CHUCKS INDEPENDENTLY|Y
01|98001|5|1|FOR HYD. 5 C COLLET CHUCKS|Y
01|98001|7|1|4TH AND 5TH AXIS INTERFACE INCLUDING DRIVES SERVO|Y
01|98001|7|2|FIBRE OPTIC CABLES EXTERNAL CABLES CONNECTORS|Y
01|98001|7|3|TRAVEL AND LABOR. 4 + 1 CAPABLE|Y
01|98008|5|1|Installation includes:Drive unit short bar fiber|Y
01|98008|5|2|optic cable communications cable bulkhead cables|Y
01|98008|5|3|external cables parameter changes service time and|Y
01|98008|5|4|travel.|Y
01|98008|12|1|Installation includes:Drive unit short bar fiber|Y
01|98008|12|2|optic cable communications cable bulkhead cables|Y
01|98008|12|3|external cables parameter changes service time and|Y
01|98008|12|4|travel.|Y
01|98023|1|1|1 pc. available in 4 weeks balance in 16 weeks|Y
01|98023|2|1|1 pc. available in 4 weeks balance in 16 weeks|Y
01|98023|3|1|(1) Positioning Block needed per Machine|Y
01|98030|3|1|Cente height to match CNC401FA-M|Y
01|98030|6|1|15 3 JAW SCROLL CHUCK AND ADAPTER PLATE|Y
01|98042|6|1|*Lyndex-Nikken to make upon confirmation of spindle|Y
01|98042|6|2|drawing.|Y
01|98042|6|3|*Net price|Y
01|98048|1|1|Reference RGA# LVR-52185|Y
01|98048|1|2|Repair of customer's MNL12-ER11(X)-SUB-SP s/n:90712 01|Y
01|98048|1|3|(Mim# 182355)|Y
01|98048|2|1|Replace all bearings seals and o-rings.|Y
01|98048|2|2|Labor is included.|Y
01|98050|6|1|CKFN32(1.1/4)-28C|Y
01|98050|6|2|CK Coolant Nut/Cap OD32mm(1.1/4In) ID25mm Sealed|Y
01|98050|31|1|NBT50-SL50-xxx aerospace|Y
01|98050|31|2|2Lock TaperPlus BT50 50mm EndMill Holder 2Lock Bolts|Y
01|98050|32|1|NBT50-SL50-xxx|Y
01|98050|32|2|2Lock TaperPlus BT50 50mm End Mill Holder|Y
01|98069|1|1|Reference RGA# LVR-52182|Y
01|98069|1|2|Repair of customer's MZQT5-ER40Z-ICE s/n: 8238702|Y
01|98069|1|3|(Mimatic# 124877)|Y
01|98069|2|1|Replace all bearings seals and o-rings.|Y
01|98069|2|2|Labor is included.|Y
01|98090|1|1|Review load/unload by ATC|Y
01|98090|2|1|Customized Positioning Block|Y
01|98091|1|1|1 DEGREE INDEXER WITH HIRTH COUPLING|Y
01|98091|1|2|CONFIRMATION OF MACHINE DATA SHEETS WILL BE NEEDED|Y
01|98091|1|3|CONFIRMATION OF PROPER FIT TO MACHINE|Y
01|98091|1|4|LADDER MAY NEED TO BE CHANGED DUE TO 1 DEGREE INDEXING|Y
01|98091|1|5|(360 POSITIONS)|Y
01|98091|2|1|HYD. SOURCE NEEDED FOR BRAKE SYSTEM|Y
01|98091|4|1|EXTERNAL CABLE SET|Y
01|98093|5|1|3 JAW PNEUMATIC CHUCK|Y
01|98093|5|2|STILL VERIFYING THE CHUCK CAN CLAMP/UNCLAMP USING M|Y
01|98093|5|3|COMMAND.|Y
01|98094|1|1|HFO TO SUPPLY MOTORS AND CABLE SETS|Y
01|98096|3|1|This pricing includes:|Y
01|98096|3|2|ID chip hole installing the chip & re-balancing|Y
01|98109|12|1|4 + 1 INSTALLATION INCLUDES 2 DRIVE FIBRE OPTIC CABLES|Y
01|98109|12|2|CONNECTORS INNER CABLES ALL PARAMETER(NO NEED FANUC|Y
01|98109|12|3|TO ADD ANY) TRAVEL LABOR|Y
01|98115|1|1|LT tool for Fuji TNW4500. ER32 IC Spindle Pitch 153.7mm|Y
01|98115|1|2|Special Order. Unit Price each|Y
01|98115|1|3|These items are considered specail and non-cancellable|Y
01|98116|4|1|Lyndex-Nikken to make upon receipt of spindle drawing|Y
01|98116|4|2|confirmation|Y
01|98116|4|3|*Net Price|Y
01|98133|1|1|Cross from part# 7.074.725|Y
01|98133|2|1|Cross from part# 05.1311.7340.505|Y
01|98135|3|1|Installed on NC5-46-FMA25.4-80S|Y
01|98149|1|1|ETA 13-14 WKS|Y
01|98158|2|1|Modification of NC5021-1250-6.00 with coolant|Y
01|98158|2|2|through the sides exiting the face x 6 holes|Y
01|98161|1|1|*installed with retention knob PS-N46E at factory|Y
01|98161|2|1|*installed on NC5-46-FMA25.4-80S at factory|Y
01|98161|4|1|*sold separate.|Y
01|98161|4|2|*Advise if you want 5pc or 10pc sold separate|Y
01|98173|1|1|ref. 124638|Y
01|98173|5|1|ref. 124632|Y
01|98176|1|1|Reference RGA# TAR-52119|Y
01|98176|1|2|CNC601FA s/n: 6015|N
01|98182|1|1|H63A(80)-12HC-3.898-ID Hydraulic Chuck per UNV#444|Y
01|98182|2|1|H63A(80)-12HC-3.898-ID Hydraulic Chuck per UNV#444|Y
01|98182|3|1|H63A(80)-12HC-3.898-ID Hydraulic Chuck per UNV#444|Y
01|98185|1|1|H63A(80)-12HC-3.898-ID Hydraulic Chuck UNV# 444|Y
01|98185|2|1|H63A(80)-12HC-3.898-ID Hydraulic Chuck UNV# 444|Y
01|98185|3|1|H63A(80)-12HC-3.898-ID Hydraulic Chuck UNV# 444|Y
01|98190|3|1|***Cable length to be verified at order placement***|Y
01|98191|3|1|***Cable length to be verified at order placement***|Y
01|98218|1|1|**Prepared with Hyd brake**|Y
01|98218|2|1|**Prepared with Hyd brake**|Y
01|98218|3|1|Installation includes: new drive unit short bar|Y
01|98218|3|2|parameter changes service time and travel.|Y
01|98218|3|3|We plan to use all existing power and feedback cables|Y
01|98249|4|1|JUST IN CASE THEY DON'T WANT TO WAIT FOR THE 105U-IDU|Y
01|98268|1|1|30pcs currently in stock at factory in Japan while|Y
01|98268|1|2|stock supply lasts.|Y
01|98276|1|1|3 stock /8 pieces 1~2wks / bal 5 pieces 12~13wks ARO|Y
01|98276|6|1|Offer 115mm instead of 135|Y
01|98281|1|1|Discount reflects purchase of one spindle speeder.|Y
01|98281|2|1|Discount reflects purchase of two spindle speeder.|Y
01|98281|3|1|Discount reflects purchase of three spindle speeders.|Y
01|98297|1|1|Tooling Certificate 1195-2055-073018|Y
01|98299|2|1|Installation includes: short bar fiber|Y
01|98299|2|2|optic cables communication cables bulk head cable|Y
01|98299|2|3|set external cable set parameter changes service|Y
01|98299|2|4|time and travel|Y
01|98310|6|1|This pricing includes:|Y
01|98310|6|2|ID chip hole installing the chip & re-balancing|Y
01|98331|1|1|We do not carry E16-078(C) standard quoted|Y
01|98347|12|1|1pc stock ETA remainder TBA|Y
01|98361|1|1|Reference RGA# LVR-52226|Y
01|98361|1|2|Repair of customer's MNL12-ER32Z-MS s/n:A1471|Y
01|98361|1|3|(Alps# T32216B03)|Y
01|98361|2|1|Bearings O-rings Seals Collet Nut and Bearing Nut|Y
01|98361|2|2|need to be replaced. Labor is included.|Y
01|98367|1|1|Reference RGA#TOR-52112|Y
01|98367|1|2|2 x CAT50-SZF25-120U Nut is badly damaged on OD face|Y
01|98367|1|3|Cam screw is cracked in half and ring tightening screws|Y
01|98367|1|4|have damaged ring.|Y
01|98379|1|1|Serial# 8182.|Y
01|98379|1|2|After IMTS it will be retuned to L/N by Yamazen|N
01|98379|1|3|After IMTS it will be returned to L/N.|Y
01|98382|1|1|Please Note: CAT40-SK10F-120U is a DIN holder.|Y
01|98382|1|2|Coolant thru the flange and can only be used on Mori|Y
01|98382|1|3|machines. Please verify with your customer.|Y
01|98383|3|1|11-pcs currently in stock/16-pcs 11~12 Wks/23pcs 15 Wks|Y
01|98386|2|1|SEMI FINISHED POSITIONING BLOCK|Y
01|98392|1|1|Reference RGA# TOR-52334|Y
01|98392|1|2|Repair quote for Tool# 1: NC5-46-C25-120|Y
01|98392|8|1|Labor charges to disassemble clean up and re-grease.|Y
01|98392|8|2|All parts are still in good working condition.|Y
01|98396|1|1|Reference RGA# QUA-52209|Y
01|98396|1|2|CAT40U-NX5-153 s/n:Kj-091 Vibration and getting hot.|Y
01|98396|5|1|Labor is covered under warranty by Tim R.|Y
01|98423|2|1|They need 6pcs total so the balance of 5pcs would be a|Y
01|98423|2|2|Special Order. Checking pricing w/factory on balance.|Y
01|98423|3|1|DIN Coolant available - DIN holes plugged|Y
01|98424|3|1|Alternative for MZMP47-CAPTO4X-OFF>>Mimatic #191186|Y
01|98424|3|2|Front End Operation System|Y
01|98424|3|3|Part Number TBD|Y
01|98430|2|1|ZKN65-1.1/2P|Y
01|98433|1|1|Reference RGA# TOR-52253|Y
01|98433|1|2|CAT40-C1.1/4SL-105U Sending in for evaluation|Y
01|98438|1|1|Must confirm 200-240V or 380-480V Power Supply ATO|Y
01|98442|2|1|Complimentary Tooling Certificate with 5AX Table purch.|Y
01|98448|1|1|PPricing reflects one time test value|Y
01|98457|1|1|Reference RGA# TAR-52284|Y
01|98457|1|2|CNC250LMA s/n: 3538|Y
01|98457|30|1|Used worm screw in stock delivery on new worm screw|Y
01|98457|30|2|is End of September.|Y
01|98457|31|1|Power & Feedback cable set.|Y
01|98461|8|1|1pc Stock remainder ETA Pending.|Y
01|98465|1|1|CAT50/SK50-HC1500-120|Y
01|98465|1|2|Special Hydraulic Holder|Y
01|98470|2|1|Unit used to convert air to more robust hydraulic brake|Y
01|98470|4|1|Installation includes: drive unit short bar fiber|Y
01|98470|4|2|optic cables communication cables bulk head cable|Y
01|98470|4|3|set external cable set parameter changes service|Y
01|98470|4|4|time and travel.|Y
01|98471|1|1|**CNC401FA tables in stock**|Y
01|98471|2|1|Unit used to convert air to more robust hydraulic brake|Y
01|98471|4|1|Installation includes: drive unit short bar fiber|Y
01|98471|4|2|optic cables communication cables bulk head cable|Y
01|98471|4|3|set external cable set parameter changes service|Y
01|98471|4|4|time and travel|Y
01|98479|3|1|(1) Positioning Block needed per Machine|Y
01|98481|3|1|(1) Positioning Block needed per Machine|Y
01|98483|4|1|EXTRA LONG 4TH AXIS CABLE SET FOR APC SYSTEM|Y
01|98506|2|1|Could use a sleeve in a 1.1/2 to a 1.1/4|Y
01|98506|2|2|Global CNC Part# CNC 86-43Z|N
01|98526|1|1|Quoted at NET price.|Y
01|98535|3|1|Tooling Certificate (NO CHARGE)|Y
01|98538|20|1|K|Y
01|98539|1|1|(45% off list = $4123.51)|Y
01|98545|1|1|C40RAM-SM3/4-180-65FP CAT40; AGH; 3/4 ARBOR;|Y
01|98545|1|2|A=65mm d=20mm; L=180mm L1=80mm;|Y
01|98545|1|3|1:1 Gear ratio; max 70Nm; 6500 RPM;|Y
01|98545|1|4|No coolant supply|Y
01|98545|1|5|ref drwg# 00021886-AN18102762|Y
01|98545|1|6|Not Included: 3/8 Arbor Screw|Y
01|98545|1|7|Net Price quoted|Y
01|98545|3|1|C40RAM-SM3/4-180EC-65FPCAT40; AGH; 3/4 ARBOR;|Y
01|98545|3|2|A=65mm d=20mm; L=180mm L1=80mm;|Y
01|98545|3|3|1:1 Gear ratio; max 70Nm; 6500 RPM;|Y
01|98545|3|4|External coolant supply|Y
01|98545|3|5|ref drwg# 00021886-AN18102762|Y
01|98545|3|6|Not Included: 3/8 Arbor Screw|Y
01|98545|3|7|Net price quoted.|Y
01|98551|1|1|HSK63A-C16-90 HSK63A 16mm Milling Chuck|Y
01|98551|1|2|Quoted at Net Price.|Y
01|98552|1|1|HSK63A-C20-95 HSK63A 20mm Milling Chuck|Y
01|98552|1|2|Quoted at NET price.|Y
01|98561|1|1|For NIKKEN factory/MC:Nakamura WY-250(Due 3/2019)|Y
01|98561|1|2|JPY220460/net ea($1=JPY110)|Y
01|98561|1|3|Delivery:17-18wks after drawing approval|Y
01|98561|2|1|For NIKKEN factory/MC:Nakamura WY-250(Due 3/2019)|Y
01|98561|2|2|JPY143662/net ea($1=JPY110)|Y
01|98561|2|3|Delivery:17-18wks after drawing approval|Y
01|98567|1|1|Balance 15-16 Weeks|Y
01|98569|1|1|C5016-1500-7.00 w special D = 2.00|Y
01|98575|1|1|Reference RGA# TAR-52273|Y
01|98575|1|2|CNCZ-180 s/n:|N
01|98578|2|1|Quoted at Net price.|Y
01|98586|1|1|Straight Shank 1.0 X ER20 Collet Chuck per drawing.|Y
01|98586|2|1|Straight Shank 1.0 X ER20 Collet Chuck per drawing.|Y
01|98588|1|1|MSA01-35030: Spindle|Y
01|98588|2|1|MSA01-35050: Spindle Cover|Y
01|98590|29|1|Tool Clamper for C6|Y
01|98618|4|1|Includes Installation Drive Units Bulkhead Cables|Y
01|98618|4|2|External Cables Service Time & Trave|Y
01|98618|5|1|$1000.00 Complimentary Tooling Certificate with|Y
01|98618|5|2|purchase of Lyndex-Nikken 5AX-250FA-M Rotary Table|Y
01|98622|1|1|Reference RGA# TAR-52366|Y
01|98622|1|2|5AX-201YA-M s/n:5536|N
01|98625|1|1|Reference RGA# TAR-52360|Y
01|98625|1|2|TAT-105 s/n: 10035|N
01|98636|2|1|Renishaw scale + mounting kit delivery is pending due|Y
01|98636|2|2|to time needed for engineering the mounting design|Y
01|98657|4|1|Quoted at NET price|Y
01|98661|11|1|4TH INREFACE INCLUDES SERVO AMPCONNECTORS MACHINE|Y
01|98661|11|2|CABLES FIBRE OPTICS TRAVEL LABOR TRAINING|Y
01|98661|13|1|$ 1000 TOOL CERT PER MACH AT FACE VALUE|Y
01|98665|11|1|4TH INREFACE INCLUDES SERVO AMPCONNECTORS MACHINE|Y
01|98665|11|2|CABLES FIBRE OPTICS TRAVEL LABOR TRAINING|Y
01|98665|13|1|$ 1000 TOOL CERT PER MACH AT FACE VALUE|Y
01|98667|11|1|4TH INREFACE INCLUDES SERVO AMPCONNECTORS MACHINE|Y
01|98667|11|2|CABLES FIBRE OPTICS TRAVEL LABOR TRAINING|Y
01|98667|13|1|$ 1000 TOOL CERT PER MACH AT FACE VALUE|Y
01|98681|3|1|EXTERNAL POWER & FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|98681|3|2|INCLUDED AT NO COST|Y
01|98681|4|1|INSTALLATION FEE INCLUDES THE FOLLOWING:|Y
01|98681|4|2|FANUC MOTORS 4TH/5TH AXIS SERVO AMPLIFIERS BULKHEAD|Y
01|98681|4|3|CABLES AND WIRING.|Y
01|98681|4|4|ALSO INCLUDED: OEM LADDER MODIFICATIONS FOR PROPER|Y
01|98681|4|5|TABLE OPERATION & ALL TRAVEL EXPENSES FOR LYNDEX|Y
01|98681|4|6|NIKKEN INSTALL TECHNICIAN.|Y
01|98681|5|1|$2000 TOOLING CERTIFICATE INCLUDED AT NO COST|Y
01|98686|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|98686|4|1|INSTALLATION INCLUDES: FANUC MOTORS 4TH/5TH AXIS|Y
01|98686|4|2|SERVO AMPLIFIERS BULKHEAD WIRING AND CONNECTORS|Y
01|98686|4|3|& ALL TRAVEL EXPENSES FOR THE LYNDEX NIKKEN INSTALL|Y
01|98686|4|4|TECHNICIAN.|Y
01|98691|3|1|ETA aprox 1-2 weeks stock at factory|Y
01|98691|11|1|List price is usually $46.25|Y
01|98692|5|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|98692|5|2|External Cables Service Time & Travel.|Y
01|98698|3|1|POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|98698|4|1|INSTALLATION FEE INCLUDES:|Y
01|98698|4|2|FANUC MOTORS 4TH/5TH AXIS SERVO AMPLIFIERS BULKHEAD|Y
01|98698|4|3|CONNECTORS + WIRING; AND LYNDEX NIKKEN INSTALLER|Y
01|98698|4|4|TRAVEL LABOR AND LODGING FOR TRIP TO CUSTOMER.|Y
01|98699|3|1|POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|98699|4|1|INSTALLATION FEE INCLUDES:|Y
01|98699|4|2|FANUC MOTORS 4TH/5TH AXIS SERVO AMPLIFIERS BULKHEAD|Y
01|98699|4|3|CONNECTORS + WIRING; AND LYNDEX NIKKEN INSTALLER|Y
01|98699|4|4|TRAVEL LABOR AND LODGING TO CUSTOMER.|Y
01|98707|1|1|Reference RGA# CUR-52235|Y
01|98707|1|2|Repair of C50-MRAM s/n:658826-01|Y
01|98707|1|3|Mimatic# 162732|Y
01|98707|2|1|Bearings seals and o-rings to be replaced.|Y
01|98707|2|2|Set screws also need to be replaced.|Y
01|98712|1|1|Reference RGA# CUR-52328|Y
01|98712|1|2|Repair of MRAM-ER25-IC s/n:9394801|Y
01|98712|1|3|Mimatic# 162765|Y
01|98712|2|1|Bearings seals and o-rings to be replaced.|Y
01|98712|2|2|Coolant bushings also need to be replaced.|Y
01|98728|1|1|Delivery will be 5-6 weeks from receipt of PO.|Y
01|98762|1|1|TC #1195-2055-073018|Y
01|98765|5|1|ALPS # OK109-15001|Y
01|98776|1|1|Tooling Certificate #20880-2037-070218|Y
01|98789|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|98795|2|1|POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|98798|2|1|Installation includes: Drive unit short bar fiber|Y
01|98798|2|2|optic cable communication cable bulkhead cables|Y
01|98798|2|3|external cables parameter changes service time and|Y
01|98798|2|4|travel.|Y
01|98799|1|1|Crossover from Mazak: 53208030401|Y
01|98799|1|2|*Ext Coolant|Y
01|98799|3|1|**Internal Coolant ONLY|Y
01|98822|1|1|**Consignment Tool - s/n# 6038003**|Y
01|98822|1|2|**Using 2015 LIST pricing**|Y
01|98822|4|1|*New Tool from L&N Stock|Y
01|98822|4|2|**Buying both pcs take 35% off this unit|Y
01|98830|3|1|To hold .1562|Y
01|98833|1|1|Reference RGA# TAR-51179|Y
01|98833|1|2|5AX-130 s/n:3925 Break are not holding due to moisture|N
01|98833|1|3|and rust.|N
01|98839|1|1|Tooling Certificate for Topre America|Y
01|98846|2|1|Installation includes: Bulkhead cable external cables|Y
01|98846|2|2|parameter changes service time and travel.|Y
01|98847|2|1|CMX installation includes: Bulkhead cables external|Y
01|98847|2|2|cables parameter changes service time.|Y
01|98847|3|1|NVX installation includes: Drive unit short bar|Y
01|98847|3|2|communications cables bulkhead cables external cables|Y
01|98847|3|3|parameter changes service time and travel.|Y
01|98847|4|1|Will require riser|Y
01|98864|1|1|Gage Length:  3.346|Y
01|98864|1|2|Nose Diameter:  2.027|Y
01|98864|1|3|TIR: 0.0002 @ 4xD|Y
01|98878|1|1|Reference RGA# TAR-52367|Y
01|98878|1|2|CNCZ180LSA3 s/n: 7016 When they hook up and try to run|N
01|98878|1|3|they are getting an alarm error.|N
01|98892|1|1|PHILLIPS TO SUPPLY MOTOR AND CABLES FOR LYNDEX NIKKEN|Y
01|98892|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|98892|1|3|CONFIRMATION OF PROPER FIT TO MACHINE MUST BE VERIFIED|Y
01|98896|1|1|Discount reflects a purchase order of 1 to 3 tools.|Y
01|98896|2|1|Discount reflects a purchase order of 1 to 3 tools.|Y
01|98896|4|1|Discount reflects a purchase order of 4 to 6 tools.|Y
01|98896|5|1|Discount reflects a purchase order of 4 to 6 tools.|Y
01|98896|7|1|Discount reflects a purchase order of 7 or more.|Y
01|98896|8|1|Discount reflects a purchase order of 7 or more|Y
01|98901|14|1|one free pull stud for every holder|Y
01|98910|1|2|CUSTOMER PRICE IS $4000 LYNDEX NIKKEN IS MATCHING|Y
01|98910|1|3|DISCOUNT FROM ELLISON AT 25%.|Y
01|98910|1|4|*** TOOL CERT VALUE IS $6000 ***|Y
01|98914|1|1|Tooling Certificate #13687-2073-081718|Y
01|98918|1|1|C5066-0750-15.00 w special 2.00 D1 dimension|Y
01|98921|2|1|Non-returnable & non cancelable|Y
01|98934|1|1|Reference RGA# QUA-52210|Y
01|98934|1|2|Repair of BMT45-SK20Z-ICE s/n:81467 03|Y
01|98934|1|3|Mimatic# 188046|Y
01|98934|2|1|Bearings seals and o-rings to be replaced.|Y
01|98967|14|1|one free pull stud for every holder|Y
01|98969|1|1|UNIV#5282|Y
01|98969|1|2|Delivery ETA 10/5~10/12 if order is placed by 8/24|Y
01|98984|3|1|1 adapter sleeve for above boring holder|Y
01|98984|4|1|3/4 adapter sleeve for above boring holder|Y
01|98984|5|1|1/2 adapter sleeve for above boring holder|Y
01|98984|6|1|3/8 adapter sleeve for above boring holder|Y
01|98984|7|1|32mm adapter sleeve for above boring holder|Y
01|98994|7|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|99001|1|1|Includes Motors & Cable Set for P300MA Control|Y
01|99001|2|1|$1000.00 Complimentary Tooling Certificate per table|Y
01|99006|1|1|Reference RGA# LVR-52336|Y
01|99006|1|2|Repair of MNL12-ER11(X)-SUB-SP s/n:87119 01|Y
01|99006|1|3|Mimatic# 183938|Y
01|99006|2|1|Bearings seals and o-rings to be replaced.|Y
01|99010|26|1|For 7/32|Y
01|99033|1|1|Reference RGA# TAR-52219|Y
01|99033|1|2|5AX-130ZA s/n:1682|N
01|99034|1|1|Demo Day Tooling Discount|Y
01|99034|1|3|Extended Net Terms|Y
01|99034|1|4|Once used in spindle not returnable|Y
01|99034|2|1|Demo Day Tooling Discount|Y
01|99034|2|2|Extended Net Terms|Y
01|99034|2|3|Once used in spindle not returnable|Y
01|99035|1|1|1 set of 2 tables for TC-32BN|Y
01|99040|1|1|Reference RGA# TAR-51427|Y
01|99040|1|2|5AX-2002FA s/n: 1617|N
01|99040|35|1|Tilt Axis Wireharness|Y
01|99053|4|1|NOSE DIAMETER - 1.181|Y
01|99053|7|1|NOSE DIAMETER - 0.94|Y
01|99053|8|1|NOSE DIAMETER - 0.94|Y
01|99080|2|1|We would add 2 coolant ports 180 degrees apart.|Y
01|99081|1|1|HA40M-ER25-ADJHAAS LIVE VDI40 ER25 ADJ 107deg;|Y
01|99081|1|2|Medium coupling?? (104.85mm or 117.55mm)L=139mm;|Y
01|99081|1|3|External coolant through pipe;|Y
01|99081|1|4|1:1 Gear ratio; 24Nm; 6500RPM;|Y
01|99081|1|5|Direction of rotation not reversal|Y
01|99081|1|6|Mimatic #193555|Y
01|99081|3|1|HAAS LIVE VDI40 ER25 ADJ 107deg;|Y
01|99081|3|2|Medium coupling?? (104.85mm or 117.55mm) L=139mm;|Y
01|99081|3|3|Int/ Ext coolant;|Y
01|99081|3|4|1:1 Gear ratio; 24Nm; 6500RPM;|Y
01|99081|3|5|Direction of rotation not reversal|Y
01|99081|3|6|Mimatic #102771|Y
01|99090|1|1|Quoted as NET pricing Non-returnable Noncancelable|Y
01|99094|1|1|Replaces TCE-38104|Y
01|99094|2|1|Replaces TCE-38103|Y
01|99097|5|1|This charge is the evaluation charge to determine|Y
01|99097|5|2|repair or replace. This fee is waived with the|Y
01|99097|5|3|acceptance of a repair quote or purchase of a|Y
01|99097|5|4|replacement. We will need to know what issues your|Y
01|99097|5|5|customer is having with the chuck to issue the RGA for|Y
01|99097|5|6|you to send it in.|Y
01|99104|4|1|*IntC/ but can run dry 24/7|Y
01|99104|4|2|**Offered at std ext pricing|Y
01|99109|3|1|CAT40 40000 RPM MAX SPEEDER|Y
01|99115|1|1|Ref. T32114|Y
01|99115|1|2|Axial|Y
01|99122|1|1|Reference RGA#TOR-52345|Y
01|99122|1|2|CAT50-NPU13-190U Rust-Unrepairable|Y
01|99126|11|1|*Coolant version|Y
01|99172|1|1|Reference RGA# TAR-52234|Y
01|99172|1|2|5AX-2MT-105-120FA-M s/n:8217|N
01|99193|1|1|Reference RGA#TAR-52233|Y
01|99193|1|2|5AX-2MT-105-120FA-M s/n: 8070|N
01|99230|1|1|Quoted at NET price.|Y
01|99240|1|1|1 stoc/5-pcs 2~3 week/Bal 10 Weeks|Y
01|99249|6|1|2 systems are quoted above.System 1 (lines 1-3) or|Y
01|99249|6|2|System 2 (lines 4-5)|Y
01|99261|1|1|Reference RGA# TAR-52327|Y
01|99261|1|2|5AX-201FA s/n: 4218|N
01|99266|1|1|1 unidad disponible para entrega hoy previa OC y pago|Y
01|99266|1|2|1 unidad desponible en Chicago para entrega inmediata|Y
01|99271|5|1|This is with J-NUT|Y
01|99283|10|1|Replacement for E40-040(C)|Y
01|99283|11|1|Replacement for E40-046(C)|Y
01|99283|12|1|Replacement for E40-056(C)|Y
01|99291|3|1|Mori MV-40M|Y
01|99295|1|1|DISCONTINUED|Y
01|99304|2|1|Installation includes: Dual axis drive unit short bar|Y
01|99304|2|2|fiber optic cables communications cables bulkhead|Y
01|99304|2|3|cabbles external cables parametyer changes service|Y
01|99304|2|4|time and travel.|Y
01|99304|2|5|Note: Special pricing.|Y
01|99315|8|1|CHS-0.8|Y
01|99317|2|1|Cable Set Both Axis|Y
01|99318|1|1|105MM PLATTERS WITH 200MM SPACING BETWEEN PLATTERS|Y
01|99318|2|1|FOR BRAKING UNLESS MANIFOLD IS PURCHASED FOR|Y
01|99318|2|2|OUTPUTS TO HYDRAULIC FIXTURING/WORKHOLDING.|Y
01|99318|3|1|4TH/5TH AXIS EXTERNAL POWER/FEEDBACK CABLE SYSTEM|Y
01|99318|4|1|ROTARY TABLE INSTALLATION FOR ELLISON/DOOSAN INCLUDES:|Y
01|99318|4|2|FANUC 4TH/5TH AXIS MOTORS SERVO AMPLIFIERS WIRING|Y
01|99318|4|3|FROM ELECTRICAL CABINET TO BULKHEAD BULKHEAD|Y
01|99318|4|4|CONNECTORS. ALL LYNDEX NIKKEN INSTALL TECHNICIAN|Y
01|99318|4|5|TRAVEL EXPENSES ARE ALSO INCLUDED.|Y
01|99319|1|1|CAT40 TAPER SPINDLE ATTACHMENT|Y
01|99319|1|2|PAGE 6 OF MODULAR RIGHT ANGLE HEAD CATALOG|Y
01|99319|2|1|NSK ADAPTER FOR IC-300 TOOL USE ON MODULAR ANGLE HEAD|Y
01|99319|2|2|PAGE 25 OF MODULAR RIGHT ANGLE HEAD CATALOG|Y
01|99319|3|1|IC-300 SMALL RIGHT ANGLE HEAD ATTACHMENT PAGE 32 OF|Y
01|99319|3|2|THE MODULAR RIGHT ANGLE HEAD CATALOG|Y
01|99319|4|1|BLANK POSITIONING BLOCK TO BE MACHINED BY CUSTOMER|Y
01|99319|4|2|FOR USE WITH POSITIONING PIN MOUNTING RAH TO SPINDLE|Y
01|99319|4|3|ON PAGE 33 OF MODULAR RIGHT ANGLE HEAD CATALOG|Y
01|99337|9|1|Balance ETA 20-21 Weeks|Y
01|99342|1|1|*ext coolant|Y
01|99342|2|1|*ext coolant|Y
01|99342|7|1|*IntC but can also run dry 24/7|Y
01|99342|8|1|*IntC but can also run dry 24/7|Y
01|99384|1|1|EXTERNAL CABLE SET INCLUDED|Y
01|99384|3|1|INCLUDED NO CHARGE|Y
01|99384|6|1|EXTERNAL CABLE SET INCLUDED|Y
01|99384|8|1|INCLUDED NO CHARGE|Y
01|99387|2|1|Mori Static T10091 Z-Axis BG63.5mm <AXIAL>|Y
01|99387|2|2|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|99397|1|1|Reference RGA# TAR-52296|Y
01|99397|1|2|5AX-201 s/n: 3655 Excessive back lash.|Y
01|99402|1|1|VDI40 DIN 6944; ER32 Static boring bar holder|Y
01|99402|1|2|Mimatic Part#104615|Y
01|99406|1|1|B50RAM-ER50-ADJ-225IC-110TPBT50; ADJ AGH; ER50; ICE;|Y
01|99406|1|2|A=110mm; d=28mm;L=225mm; L1=109mm;|Y
01|99406|1|3|1:1 gear; max 70Nm; 6000RPM;|Y
01|99406|1|4|coolant through spindle 1015PSI|Y
01|99406|1|5|Mimatic #193579|Y
01|99406|4|1|B50RAM-ER32-ADJ-225IC-110TPBT50; ADJ AGH; ER32; ICE;|Y
01|99406|4|2|A=110mm; d=28mm;L=225mm; L1=109mm;|Y
01|99406|4|3|1:1 gear; max 70Nm; 6000RPM;|Y
01|99406|4|4|coolant through spindle 1015PSI.|Y
01|99406|4|5|Mimatic #178140|Y
01|99432|2|1|Installation includes: drive unit short bar fiber|Y
01|99432|2|2|optic cables communication cables bulk head cable|Y
01|99432|2|3|set external cable set parameter changes service|Y
01|99432|2|4|time and travel|Y
01|99433|2|1|Installation includes: drive unit short bar fiber|Y
01|99433|2|2|optic cables communication cables bulk head cable|Y
01|99433|2|3|set external cable set parameter changes service|Y
01|99433|2|4|time and travel|Y
01|99440|1|1|Biglia live; BMT55; ER32; 90deg Ext coolant; 1015PSI;|Y
01|99440|1|2|1:1 Gear ratio; max 70Nm; 6500RPM;|Y
01|99440|1|3|Direction rotation reversal L1=70mm;|Y
01|99440|1|4|ETA 19-21 WKS after approval of drawing|Y
01|99440|1|5|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|99440|2|1|Biglia live; BMT55; ER32; 90 deg|Y
01|99440|2|2|Ext/ Int coolant; 1015PSI; ICE version|Y
01|99440|2|3|Direction rotation reversal|Y
01|99440|2|4|L1=70mm; L=109mm; L2=39mm; S=75mm; S1=104mm|Y
01|99440|2|5|ETA 19-21 WKS after approval of drawing|Y
01|99440|2|6|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|99440|3|1|Biglia live; BMT55; ER32; 90deg|Y
01|99440|3|2|Ext coolant; 1015PSI|Y
01|99440|3|3|1:1 Gear ratio; max 70Nm; 6500RPM|Y
01|99440|3|4|Direction rotation not reversal|Y
01|99440|3|5|L1=70mm;|Y
01|99440|3|6|ETA 19-21 WKS upon approval drawing|Y
01|99440|3|7|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|99440|4|1|Biglia live; BMT55; ER32; 90deg|Y
01|99440|4|2|Ext/ Int coolant; 1015PSI; ICE version|Y
01|99440|4|3|1:1 Gear ratio; max 70Nm; 6500RPM;|Y
01|99440|4|4|Direction rotation not reversal|Y
01|99440|4|5|(direction rotation reversal for tool #186498)|Y
01|99440|4|6|L1=70mm; L=109mm; L2=39mm; S=75mm;|Y
01|99440|4|7|S1=104mm|Y
01|99440|4|8|ETA 19-21 WKS|Y
01|99440|4|9|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|99442|1|1|QUOTED AS NET PRICINGNon-returnableNon-cancelable|Y
01|99442|6|1|QUOTED AS NET PRICINGNon-returnableNon-cancelable|Y
01|99443|2|1|HSK125A-HC1-4.00|Y
01|99447|1|1|B3506-0125-4.00  Special BT35 1/8 w 4.00 gage length|Y
01|99453|5|1|***BASE ONLY***|Y
01|99453|7|1|*Head/attachment only*|Y
01|99453|8|1|*Head/attachment only*|Y
01|99463|10|1|**5pc Min Required|Y
01|99463|12|1|**5pc Min Required|Y
01|99463|13|1|**5pc Min Required|Y
01|99463|16|1|**5pc Min Required|Y
01|99463|19|1|**5pc Min Required|Y
01|99463|21|1|**5pc Min Required|Y
01|99463|23|1|**5pc Min Required|Y
01|99463|27|1|**5pc Min Required|Y
01|99463|30|1|**5pc Min Required|Y
01|99463|32|1|**5pc Min Required|Y
01|99463|33|1|**5pc Min Required|Y
01|99472|1|1|Machine: Hitachi Seiki|Y
01|99472|1|2|Quoted at NET price.|Y
01|99473|2|1|Adapter ISO-A6 Type FF-3 D140|Y
01|99473|4|1|Thread to Thread|Y
01|99504|1|1|This iten|Y
01|99511|1|1|3-5 day lead1 pc subject to change.Double check for|Y
01|99511|1|2|higher quantity|Y
01|99514|1|1|Please note: Discount reflects a purchase order of|Y
01|99514|1|2|100~250 tubes. If quantities change we will need to|Y
01|99514|1|3|re-quote.|Y
01|99564|2|1|4 stock 10pcs 3-4 wks balance 16 weeks mfg|Y
01|99571|3|1|Chuck Adapter Plate|Y
01|99571|5|1|Cylinder Adapter Plate|Y
01|99571|6|1|Draw Tube|Y
01|99571|7|1|Hyd. Lines/Fittings|Y
01|99573|17|1|4 pcs ship 3~5 days|Y
01|99573|17|2|bal 4 pcs ETA 10/24|Y
01|99573|18|1|7 ship 3~5 days|Y
01|99573|18|2|bal 1pc ETA 3wks|Y
01|99575|10|1|INCLUDES: MOTORS SERVO AMPLIFIER FOR 4TH AXIS|Y
01|99575|10|2|BULKHEAD CABLES/WIRING AND ALL APPLICABLE TRAVEL|Y
01|99575|10|3|EXPENSES FOR LYNDEX NIKKEN INSTALLATION TECHNICIAN.|Y
01|99587|1|1|TCD-A6026 NT40 LONG + PS-1|Y
01|99587|1|2|Pancake Cylinder w/ Long center flange|Y
01|99587|1|3|Including Bearing cover 2P Manifold Locking block|Y
01|99587|1|4|and Pipe.|Y
01|99587|1|5|Special order. Unit price.|Y
01|99589|1|1|Quote as NET pricing Non-returnableNon-cancelable|Y
01|99589|2|1|Quote as NET pricing Non-returnableNon-cancelable|Y
01|99597|2|1|DESIGN AND MANUFACTURE OF POSITIONING BLOCK UPON|Y
01|99597|2|2|RECEIVING SPINDLE DRAWINGS AND QUESTIONAIRE.|Y
01|99598|1|1|Reference RGA# TAR-52292|Y
01|99598|1|2|5AX-350FA-R36 s/n:3521|N
01|99601|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|99601|10|1|INCLUDES: MOTORS SERVO AMPLIFIER FOR 4TH AXIS|Y
01|99601|10|2|BULKHEAD CABLES/WIRING AND ALL APPLICABLE TRAVEL|Y
01|99601|10|3|EXPENSES FOR LYNDEX NIKKEN INSTALLATION TECHNICIAN.|Y
01|99615|4|1|EXTERNAL CABLE SET|Y
01|99615|6|1|$ 1000 LIST PRICE TOOL CERT AT NO CHARGE|Y
01|99615|8|1|COMPLETE 4TH AXIS INSTALLATION. SERVO MOTOR ADDITIONAL|Y
01|99615|8|2|AXIS DRIVE INTERNAL CABLES FIBRE OPTICS ALL|Y
01|99615|8|3|CONNECTORS TRAVEL AND LABOR|Y
01|99617|1|1|Non-returnable Non-cancelable|Y
01|99622|1|1|Reference RGA#CUR-52323|Y
01|99622|1|2|Rpair of customer's C50RAM-ER32-285ST s/n:56016 02|Y
01|99622|1|3|(Mimatic# 135653)|Y
01|99622|2|1|Bearings seals and o-rings to be replaced.|Y
01|99622|4|1|Reference RGA# CUR-52323|Y
01|99622|4|2|Rpair of customer's C50RAM-ER32-285ST s/n:6070343905|Y
01|99622|4|3|(Mimatic# 13.14.71012.001)|Y
01|99622|5|1|Bearings seals and o-rings to be replaced.|Y
01|99635|3|1|**Slotted Arbor Screw for TP CAT40 1 SMH|Y
01|99635|7|1|***Not offered in Dual Contact**|Y
01|99635|13|1|covers .219|Y
01|99644|1|1|Reference RGA# CUR-52386|Y
01|99644|1|2|Repair of customer's MRAM-NSK-M17 s/n:87408 07|Y
01|99644|1|3|(Mimatic# 162756)|Y
01|99644|2|1|Bearings and spindle to be replaced.|Y
01|99645|1|1|Quote is based on STD pitch (82mm).|Y
01|99645|2|1|Quote is based on STD pitch (82mm).|Y
01|99647|1|1|#20 Cam for H018M15(HW-15-2J3J-HS-3S)|Y
01|99647|2|1|#38 Wrench for H018M15 (HW-15-2J3J-HS-3S)|Y
01|99647|2|2|Set Consists of #38/39/40/41  sold in set only.|Y
01|99658|1|1|Reference RGA# LVR-52380|Y
01|99658|1|2|Repair of MZQT5-ER40X-OFF-ICE s/n:81593 03|Y
01|99658|1|3|(Mimatic# 123690)|Y
01|99658|2|1|Bearings seals and o-rings to be replaced.|Y
01|99658|4|1|Reference RGA# LVR-52380|Y
01|99658|4|2|Repair of MZQT5-ER40X-OFF-ICE s/n:48285 01|Y
01|99658|4|3|(Mimatic# 123690)|Y
01|99658|5|1|Bearings seals and o-rings to be replaced.|Y
01|99658|5|2|Resurface spindles as needed.|Y
01|99658|7|1|Reference RGA# LVR-52380|Y
01|99658|7|2|Repair of MZQT5-ER40Z-ICE s/n: 74672 03|Y
01|99658|7|3|(Mimatic# 124877)|Y
01|99658|8|1|Bearings seals and o-rings to be replaced.|Y
01|99658|10|1|Reference RGA# LVR-52380|Y
01|99658|10|2|Repair of MZQT5-ER40Z-ICE s/n:32592 02|Y
01|99658|10|3|(Mimatic# 124877)|Y
01|99658|11|1|Bearings seals and o-rings to be replaced.|Y
01|99665|10|1|KM32-4.4|Y
01|99665|11|1|KM32-6.6|Y
01|99667|5|1|WRENCH FOR ER16 COLLET CHUCKS INCLUDED AT NO COST|Y
01|99667|9|1|WRENCH FOR ER32 COLLET CHUCKS INCLUDED AT NO COST|Y
01|99671|6|1|COMPLETE 4TH AXIS INSTALLATION. SERVO MOTOR ADDITIONAL|Y
01|99671|6|2|AXIS DRIVE INTERNAL CABLES FIBRE OPTICS ALL|Y
01|99671|6|3|CONNECTORS TRAVEL AND LABOR|Y
01|99677|4|1|Lead time AFTER drawing approval|Y
01|99677|7|1|Lead time is AFTER Drawing approval|Y
01|99680|1|1|Reference RGA# TAR-52395|Y
01|99680|1|2|5AX-2002DA21FA s/n:n/a|N
01|99709|5|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|99709|5|2|External Cables Service Time & Travel.|Y
01|99715|1|1|NBT40-C20-70|Y
01|99715|1|2|2Lock TaperPlus NBT40 20mm Milling Chuck|Y
01|99715|1|3|Unit Price Each.|Y
01|99717|2|1|Wrench is not included with holder.|Y
01|99718|1|1|s/n# 3186F|Y
01|99730|1|1|Please note: Items is not standard stock and is|Y
01|99730|1|2|not returnable and can not be cancelled once purchasse|Y
01|99730|1|3|order has been received.|Y
01|99737|1|1|External cables are included.  Package includes on-site|Y
01|99737|1|2|interface.  4th axes software is Alta's responsiblity.|Y
01|99737|1|3|Requires two M-codes.|N
01|99752|1|1|Reference RGA# TOR-52369|Y
01|99752|1|2|Quote for an unrepairable holder that was sent in on|Y
01|99752|1|3|RGA# TOR-52369.|Y
01|99760|1|1|Set includes the following: 1-CNCZ180LYA-BR table with|Y
01|99760|1|2|sheet metal divider junction box with main cable set|Y
01|99760|1|3|DISCONTINUED MOTOR/AMP. DISCOUNT MAX 35%|Y
01|99760|1|4|NO TOOL CERTIFICATE OFFERED DUE TO THE ABOVE|Y
01|99760|1|5|2ND TABLE ON QUOTE # 99760|Y
01|99761|1|1|Set includes the following: 1-CNCZ180LYA-BR table with|Y
01|99761|1|2|main cable set|Y
01|99761|1|3|DISCONTINUED MOTOR/AMP. DISCOUNT MAX 35%|Y
01|99761|1|4|NO TOOL CERTIFICATE OFFERED DUE TO THE ABOVE|Y
01|99761|1|5|1st TABLE ON QUOTE # 99760|Y
01|99765|1|1|Includes Haas Motors & Cable Set|Y
01|99775|1|1|155335 (short type clamping nut)|Y
01|99775|4|1|155367(short type clamping nut)|Y
01|99775|7|1|121502 (long type clamping nut)|Y
01|99775|7|2|Wrench not included is a hex.|Y
01|99775|9|1|121474 1/2 Weldon End Mill Holder|Y
01|99775|9|2|No wrench needed.|Y
01|99775|10|1|166791 MI40 Blank|Y
01|99779|3|1|Option 1|Y
01|99779|4|1|Option 2|Y
01|99779|9|1|COMPLETE 4TH AXIS INSTALLATION. SERVO MOTOR ADDITIONAL|Y
01|99779|9|2|AXIS DRIVE INTERNAL CABLES FIBRE OPTICS ALL|Y
01|99779|9|3|CONNECTORS TRAVEL AND LABOR|Y
01|99782|1|1|Reference RGA# TOR52461|Y
01|99782|1|2|Repair of PF-2|Y
01|99782|2|1|LR1-N 1.5V Batteries|Y
01|99782|3|1|Labor quoted for calibration.|Y
01|99785|1|1|C5066-0750-15.00 w/ special D1 Dimension = 2.00|Y
01|99787|3|1|Option 1|Y
01|99787|4|1|Option 2|Y
01|99787|9|1|COMPLETE 4TH AXIS INSTALLATION. SERVO MOTOR ADDITIONAL|Y
01|99787|9|2|AXIS DRIVE INTERNAL CABLES FIBRE OPTICS ALL|Y
01|99787|9|3|CONNECTORS TRAVEL AND LABOR|Y
01|99791|6|1|CONFIRM CABLE LENGTH|Y
01|99791|7|1|CONFIRM CABLE LENGTH|Y
01|99799|1|1|HSK63A-HC1250-120|Y
01|99802|1|1|Gage Length:  3.346|Y
01|99802|1|2|Nose Diameter:  2.027|Y
01|99802|1|3|TIR: 0.0002 @ 4xD|Y
01|99808|2|1|NIKKEN ROTARY INDEXER WITH INDEPENDENT CONTROLLER|Y
01|99808|2|2|INSTALLATION NOT INCLUDED|Y
01|99823|1|1|Estimate for recommended inspection/replacement of|Y
01|99823|1|2|bearings and seals.|Y
01|99823|2|1|Update motors and cables on existing CNC200L S/N 8365|Y
01|99823|2|2|to be mounted on a new Brother S700x1|Y
01|99839|2|1|Cable Set both axis|Y
01|99840|1|1|This is NOT High Speed.|Y
01|99841|1|1|BT40-ZMAC42-150|Y
01|99844|12|1|A tariff surcharge may be added to this quotation in|Y
01|99844|12|2|the event of a sustained tariff increase on the|Y
01|99844|12|3|importation of this product.  Any surcharge will be|Y
01|99844|12|4|disclosed prior to acceptance of an order.|Y
01|99857|3|1|YA Model same price|Y
01|99857|3|2|HAAS to supply SERVO motor|Y
01|99876|1|1|P&D are pending.To be updated|Y
01|99876|3|1|Spindle drawing must be provided if ordered|Y
01|99877|1|1|Alternative for PS-381E|Y
01|99889|2|1|5 stk  5 on b/o ETA 9/14 Balance 11-12wks mfg + ship|Y
01|99889|5|1|9 on b/o ETA 9/14 bal 11-12wks mfg + ship|Y
01|99889|8|1|7 Stk 16 ETA 9/14 bal 11-12wks mfg + ship|Y
01|99889|23|1|SK10-3AC  NO QUOTE|Y
01|99902|1|1|#4 Center for H05M10|Y
01|99902|2|1|#5 Work Locator for H05M10|Y
01|99902|3|1|#23 Key or Pin for H05M10|Y
01|99902|4|1|#24 Key for H05M10|Y
01|99902|5|1|#3 Spring for H05M10|Y
01|99912|2|1|Quoted as NET pricing|Y
01|99926|2|1|Installation includes: drive unit short bar fiber|Y
01|99926|2|2|optic cables communication cables bulk head cable|Y
01|99926|2|3|set external cable set parameter changes service|Y
01|99926|2|4|time and travel|Y
01|99926|7|1|(Description same as above)|Y
01|99937|2|1|Installation includes: drive unit short bar fiber|Y
01|99937|2|2|optic cables communication cables bulk head cable|Y
01|99937|2|3|set external cable set parameter changes service|Y
01|99937|2|4|time and travel|Y
01|99952|3|1|Tooling Certificate $7000 Face Value|Y
01|99980|1|1|CABLES AND MOTOR NOT INCLUDED IN THIS COST.|Y
01|99980|1|2|HARTWIG TO PROVIDE MOTOR AND CABLES|Y
01|99980|1|3|MOTOR:aiF4/4000|Y
01|99980|1|4|WEIGHT OF ROTARY AND FANUC MOTOR: 160LBS|Y
01|99980|3|1|RISER FOR ROTARY. PRICE IS NET TO HARTWIG. PLEASE BE|Y
01|99980|3|2|SURE TO INCRESE FOR YOUR NEEDS.|Y
01|99980|3|3|WEIGHT APPROX 20LBS.|Y
01|99980|4|1|10 CHUCK PLUS CUSTOM ADAPTER PLATE 10 CHUCK TO 7|Y
01|99980|4|2|ROTARY TABLE. WEIGHT APPROX 85 LBS.|Y
01|99980|5|1|THIS IS THE UPGRADED GEAR BOX SO WE CAN PUT THE LARGER|Y
01|99980|5|2|MOTOR ON THE ROTARY. NEEDED BECAUSE OF THE 10 CHUCK.|Y
01|99980|5|3|PRICE IS NET TO HARWIG.|Y
01|99992|1|1|Expenses for Service Call|Y
01|99992|1|2|Flight/Car/Hotel/Food Etc|Y
01|99992|2|1|Labor Cost for 8hrs x 2 full working days|Y
01|100013|1|1|With PSN-46E|Y
01|100016|1|1|Pricing reflects one time test value|Y
01|100016|8|1|Pricing reflects one time test value|Y
01|100017|1|1|NBT50-MDSK13-105|Y
01|100017|1|2|NBT50 SK13 Major Dream Max 15000rpm|Y
01|100017|2|1|NCAT50-MDSK13-105|Y
01|100017|2|2|NCAT50 SK13 Major Dream Max 15000rpm|Y
01|100017|3|1|NBT50-MDSK16-105|Y
01|100017|3|2|NBT50 SK16 Major Dream Max 15000rpm|Y
01|100017|4|1|NCAT50-MDSK16-105|Y
01|100017|4|2|NCAT50 SK16 Major Dream Max 15000rpm|Y
01|100032|34|1|4pcs 1week 1 pc ETA 10/20|Y
01|100043|2|1|350mm faceplate with 154 MM (6.06)thru hole|Y
01|100043|2|2|Cables and servo motor included. Hyd source needed for|Y
01|100043|2|3|brake.|Y
01|100043|4|1|450mm faceplate with 270mm (10.62) thru hole|Y
01|100043|4|2|Servo motor and cables included/ Hyd Source needed for|Y
01|100043|4|3|brake|Y
01|100043|6|1|630mm faceplate with 355mm (14) thru hole|Y
01|100043|6|2|Servo motor and cables included. Hyd source needed for|Y
01|100043|6|3|brake.|Y
01|100050|2|1|Please Note: This nut is non standard stock. Once a|Y
01|100050|2|2|purchase order is placed it cannot be cancelled or|Y
01|100050|2|3|returned.|Y
01|100069|1|1|Reference RGA# TAR-52291|Y
01|100069|1|2|5AX-350FA-R36 s/n:3960|N
01|100069|21|1|Freight charges for table shipped from CAPT to Lyndex.|Y
01|100069|21|2|See invoice attached.|Y
01|100081|1|1|Price includes 10 free Taper Plus extended holders.|Y
01|100085|1|1|AHK30-SK10 Quick Type Slim Chuck|Y
01|100085|1|3|Quoted at net pricing not standard stock. Once PO is|Y
01|100085|1|4|received item can not be cancelled or returned.|Y
01|100096|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|100097|4|1|EXTRA LONG 4TH AXIS CABLE SET FOR APC SYSTEM|Y
01|100103|5|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|100103|5|2|External Cables Service Time & Travel.|Y
01|100106|23|1|Please note: This is the retention knob for Makino A61.|Y
01|100106|23|2|I can offer the knob at $5.00 net with the purchase|Y
01|100106|23|3|of a matching taper holder.|Y
01|100110|2|1|**Only offered with Jet Slots|Y
01|100142|1|1|OD=42mm ID=1.1/4 Large Chamfered Edge|Y
01|100142|1|2|for:  Grinding Machines|Y
01|100142|1|3|*With Internal Grooves for gripping strongly to elimate|Y
01|100142|1|4|the oil|Y
01|100145|1|1|5 collets backordered 2 ETA 9/20~9/28 bal ETA 11/2|Y
01|100171|1|1|6 length|Y
01|100181|1|1|We have 2 pcs in stock|Y
01|100181|1|2|This item is considered a non standard stock special|Y
01|100181|1|3|Once the PO is placed the item is nonreturnable|Y
01|100183|1|1|HSK63A-HC1250-120   NO QUOTE|Y
01|100183|2|1|HSK63A-HC1250-126|Y
01|100183|2|2|Hydraulic Chuck HSK63A Taper 1.1/4  126mm gage length|Y
01|100186|1|1|155335 (short type clamping nut)|Y
01|100186|4|1|155367(short type clamping nut)|Y
01|100186|7|1|121502 (long type clamping nut)|Y
01|100186|7|2|Wrench not included is a hex.|Y
01|100186|9|1|121474 1/2 Weldon End Mill Holder|Y
01|100186|9|2|No wrench needed.|Y
01|100186|10|1|166791 MI40 Blank|Y
01|100194|3|1|PRICE AND ETA PENDING|Y
01|100196|11|1|P & D pending from factory|Y
01|100203|2|1|Not standard stock considered special item.  Quoted at|Y
01|100203|2|2|net pricing.  Once a PO is places with the factory|Y
01|100203|2|3|it may not be cancelled or returned.|Y
01|100203|3|1|Not standard stock considered special item.  Quoted at|Y
01|100203|3|2|net price.Once the PO is placed with the factory|Y
01|100203|3|3|it may not be cancelled or returned.|Y
01|100203|4|1|Not standard stockconsidered special item. Quoted at|Y
01|100203|4|2|net price.Once the PO has been placed with the factory|Y
01|100203|4|3|it can not be cancelled or returned.|Y
01|100203|5|1|Not standard stock considered special item. Quoted at|Y
01|100203|5|2|net price.Once a PO has been placed wiht the factory|Y
01|100203|5|3|it can not be cancelled or returned.|Y
01|100210|1|1|Note: Quoted at net pricing. Item is a special and not|Y
01|100210|1|2|standard stock.  Once purchase order is received item|Y
01|100210|1|3|can not be returned or order can not be cancelled.|Y
01|100210|2|1|Note:Quoted at net pricing. Item is a special and not|Y
01|100210|2|2|standard stock. Once purchase order is received item|Y
01|100210|2|3|can not be returned or order can not be cancelled.|Y
01|100225|1|1|8 pcs End Oct/ 2 pcs pending|Y
01|100227|3|1|**standard stock as 3.50|Y
01|100227|4|1|*wrench for ER11 collet chucks|Y
01|100227|5|1|*wrench for ER16 collet chucks|Y
01|100227|7|1|**standard stock as 5.00|Y
01|100227|9|1|**standard stock as 5.00|Y
01|100234|8|1|Mimatic part# 180586|Y
01|100237|8|1|HSK100A-SK20C-120-IDU|Y
01|100237|9|1|HSK100A-SK20C-120-IDU|Y
01|100237|11|1|HSK100A-SK20C-150-IDU|Y
01|100237|12|1|HSK100A-SK20C-150-IDU|Y
01|100237|14|1|HSK100A-SK6-150-IDU|Y
01|100237|15|1|HSK100A-SK6-150-IDU|Y
01|100237|16|1|HSK100A-SK6-150-IDU|Y
01|100243|1|1|CAT40 ER11 AH U Type|Y
01|100243|1|2|1 PC PRICING Non-returnable Non-cancelable|Y
01|100243|1|3|ETA 21-23 WKS AFTER DRAWING APPROVAL|Y
01|100243|2|1|CAT40 ER11 AH U Type|Y
01|100243|2|2|2 PC PRICING Non-returnable Non-cancelable|Y
01|100243|2|3|ETA 21-23 WKS AFTER DRAWING APPROVAL|Y
01|100245|6|1|2.36 gl|Y
01|100245|7|1|4.72 gl|Y
01|100266|5|1|WRENCH FOR ER16 COLLET CHUCKS INCLUDED AT NO COST|Y
01|100266|9|1|WRENCH FOR ER32 COLLET CHUCKS INCLUDED AT NO COST|Y
01|100283|2|1|C5-ER20-3.94|Y
01|100290|3|1|Designed and Manufactured by L&N upon receipt of|Y
01|100290|3|2|spindle drawing confirmation|Y
01|100290|3|3|*net price|Y
01|100290|3|4|*1wk delivery from recpt of tech info|Y
01|100304|1|1|Reference RGA# TAR-52376|Y
01|100304|1|2|5AX-130-BAYA-BR s/n:1739|N
01|100312|1|1|Demo/Used 5AX-201YA Sigma 1|Y
01|100312|1|2|Lyndex-Nikken to include motors|Y
01|100312|1|3|Customer to supply Cables|Y
01|100323|1|1|NCAT40-SF1000-3.94|Y
01|100337|3|1|1 stk factory Jpn.  Balance 13-14wks mfg + ship|Y
01|100342|1|1|CAT50-HC20-200|Y
01|100347|1|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|100347|2|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|100348|3|1|Includes: drive unit interface cables external cables|Y
01|100348|3|2|communications cables fiber optic cable travel labor|Y
01|100348|3|3|expenses|Y
01|100362|4|1|Description:6.40L 1.48L1 5.00L2 1.38D1|Y
01|100368|1|1|UNIV#5282|Y
01|100372|1|1|ref. Mori Seiki par# T00171|Y
01|100372|1|2|*quoted as NET price|Y
01|100376|1|1|Reference RGA# CUR-52188|Y
01|100376|1|2|BT50-NX5-151 s/n: kj-023|Y
01|100376|1|3|Making noises and would like to have it evaluated and|Y
01|100376|1|4|repair. They're in the middole of a job so whatever can|Y
01|100376|1|5|be done to expedite.|Y
01|100395|1|1|Tooling Certificate Number: 13687-1041-100317|Y
01|100409|1|1|Clutch Kit for OKL3-ER32X|Y
01|100410|3|1|C4016-0500-4.00DIN|Y
01|100410|4|1|C4016-0250-4.00DIN|Y
01|100410|6|1|C4016-0500-4.00DIN|Y
01|100410|7|1|C4016-0250-4.00DIN|Y
01|100425|2|1|4 PORT ROTARY JOINT FOR CNC260|Y
01|100430|1|1|OD=42mm ID=1.1/4 Large Chamfered Edge|Y
01|100430|1|2|for:  Grinding Machines|Y
01|100430|1|3|*With Internal Grooves for gripping strongly to elimate|Y
01|100434|1|1|Please note: Discount reflects a purchase order of|Y
01|100434|1|2|10 or more holders.|Y
01|100443|3|1|Quoted at NET price.|Y
01|100476|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|100476|3|2|External Cables Service Time and Travel.|Y
01|100480|1|1|Reference RGA#LVR-52400|Y
01|100480|1|2|Repair of MZQT47-ER16-AD s/n:32119 01|Y
01|100480|1|3|(Mimatic# 125027)|Y
01|100480|2|1|Bearings seals and o-rings to be replaced.|Y
01|100494|1|1|Quoted at NET price.|Y
01|100526|1|1|CAT50-SF0250-8.00|Y
01|100533|2|1|Cable Set up to 10 ft|Y
01|100536|5|1|MODIFICATION TO ALLOW PART TO EXTEND THROUGH TABLE.|Y
01|100536|7|1|INCLUDES REQUIRED SERVOS FOR EACH AXIS CABLES AND|Y
01|100536|7|2|INTEGRATION WITH THE MACHINE|Y
01|100536|7|3|DOESN'T INCLUDE ACTIVTING 4TH AND 5TH OPTION ON CONTROL|Y
01|100536|7|4|PRICE IS NET TO PD BROWNE.|Y
01|100537|3|1|NEED TO BE 2 JAW|Y
01|100549|1|1|Delivery: 37-pcs currently stock at Nikken Japan|Y
01|100549|1|2|1~2 weeks. Balance 14~15 Weeks|Y
01|100582|1|1|10 PC pricing|Y
01|100582|2|1|20 PC pricing|Y
01|100582|3|1|40 PC pricing|Y
01|100586|1|1|13485-2091-090418|Y
01|100586|18|1|Plus $125/ea for JET SLOTS|Y
01|100586|19|1|Plus $125/ea for JET SLOTS|Y
01|100587|1|1|Replaces GS1730|Y
01|100621|1|1|TABLE TO REPLACE GOLDEN SUN TABLE BEING USED ON MAZAK|Y
01|100621|1|2|MARTRIX 410 A & B MACJHINES. WE WILL REQUIRE WIRE|Y
01|100621|1|3|SCHEMATICS Please advise which Nikken table S/N to|Y
01|100621|1|4|duplicate. Subplate NET cost|Y
01|100626|1|1|SERVO MOTORS AND CABLES INCLUDED|Y
01|100632|1|1|1 PC PRICING|Y
01|100632|1|2|VDI40 Straight ER32; DIN 10889 - 69880;|Y
01|100632|1|3|Int/ Ext coolant; 1015PSI;L1=75.5mm;|Y
01|100632|1|4|1:1 Gear ratio; max torque M=80Nm; 6500RPM|Y
01|100632|1|5|NO reversal of rotation direction;Ref drwg# 00028517|Y
01|100632|1|6|Quoted as NET pricingNon-returnable Non-cancelable|Y
01|100632|2|1|2 PC PRICING|Y
01|100632|2|2|VDI40 Straight ER32; DIN 10889 - 69880;|Y
01|100632|2|3|Int/ Ext coolant; 1015PSI;L1=75.5mm;|Y
01|100632|2|4|1:1 Gear ratio; max torque M=80Nm; 6500RPM|Y
01|100632|2|5|NO reversal of rotation direction;Ref drwg# 00028517|Y
01|100632|2|6|Quoted as NET pricingNon-returnable Non-cancelable|Y
01|100632|3|1|3 PC PRICING|Y
01|100632|3|2|VDI40 Straight ER32; DIN 10889 - 69880;|Y
01|100632|3|3|Int/ Ext coolant; 1015PSI;L1=75.5mm;|Y
01|100632|3|4|1:1 Gear ratio; max torque M=80Nm; 6500RPM|Y
01|100632|3|5|NO reversal of rotation direction;Ref drwg# 00028517|Y
01|100632|3|6|Quoted as NET pricingNon-returnable Non-cancelable|Y
01|100632|4|1|4 PC PRICING|Y
01|100632|4|2|VDI40 Straight ER32; DIN 10889 - 69880;|Y
01|100632|4|3|Int/ Ext coolant; 1015PSI;L1=75.5mm;|Y
01|100632|4|4|1:1 Gear ratio; max torque M=80Nm; 6500RPM|Y
01|100632|4|5|NO reversal of rotation direction;Ref drwg# 00028517|Y
01|100632|4|6|Quoted as NET pricingNon-returnable Non-cancelable|Y
01|100632|5|1|5 PC PRICING|Y
01|100632|5|2|VDI40 Straight ER32; DIN 10889 - 69880;|Y
01|100632|5|3|Int/ Ext coolant; 1015PSI;L1=75.5mm;|Y
01|100632|5|4|1:1 Gear ratio; max torque M=80Nm; 6500RPM|Y
01|100632|5|5|Quoted as NET pricingNon-returnable Non-cancelable|Y
01|100632|6|1|1 PC PRICING|Y
01|100632|6|2|VDI40 90 deg ER32; DIN 10889 - 69880;|Y
01|100632|6|3|Int/ Ext coolant; 1015PSI; ICE version|Y
01|100632|6|4|L1=110mm; L4=71mm|Y
01|100632|6|5|1:1 Gear ratio; max torque M=80Nm; 6500RPM;|Y
01|100632|6|6|NO reversal of rotation direction;|Y
01|100632|6|7|Ref drwg# 00031276|Y
01|100632|6|8|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|100632|7|1|2 PC PRICING|Y
01|100632|7|2|VDI40 90 deg ER32; DIN 10889 - 69880;|Y
01|100632|7|3|Int/ Ext coolant; 1015PSI; ICE version|Y
01|100632|7|4|L1=110mm; L4=71mm|Y
01|100632|7|5|1:1 Gear ratio; max torque M=80Nm; 6500RPM;|Y
01|100632|7|6|NO reversal of rotation direction;|Y
01|100632|7|7|Ref drwg# 00031276|Y
01|100632|7|8|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|100632|8|1|3 PC PRICING|Y
01|100632|8|2|VDI40 90 deg ER32; DIN 10889 - 69880;|Y
01|100632|8|3|Int/ Ext coolant; 1015PSI; ICE version|Y
01|100632|8|4|L1=110mm; L4=71mm|Y
01|100632|8|5|1:1 Gear ratio; max torque M=80Nm; 6500RPM;|Y
01|100632|8|6|NO reversal of rotation direction;|Y
01|100632|8|7|Ref drwg# 00031276|Y
01|100632|8|8|Quoted as NET pricingNon-returnable Non-cancelable|Y
01|100632|9|1|4 PC PRICING|Y
01|100632|9|2|VDI40 90 deg ER32; DIN 10889 - 69880;|Y
01|100632|9|3|Int/ Ext coolant; 1015PSI; ICE versio|Y
01|100632|9|4|L1=110mm; L4=71mm|Y
01|100632|9|5|1:1 Gear ratio; max torque M=80Nm; 6500RPM;|Y
01|100632|9|6|NO reversal of rotation direction;|Y
01|100632|9|7|Ref drwg# 00031276|Y
01|100632|9|8|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|100632|10|1|5 PC PRICING|Y
01|100632|10|2|VDI40 90 deg ER32; DIN 10889 - 69880;|Y
01|100632|10|3|Int/ Ext coolant; 1015PSI; ICE versio|Y
01|100632|10|4|L1=110mm; L4=71mm|Y
01|100632|10|5|1:1 Gear ratio; max torque M=80Nm; 6500RPM;|Y
01|100632|10|6|NO reversal of rotation direction;|Y
01|100632|10|7|Ref drwg# 00031276|Y
01|100632|10|8|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|100632|11|1|1 PC PRICING|Y
01|100632|11|2|VDI40 90 deg ER32; DIN 10889 - 69880;|Y
01|100632|11|3|Int/ Ext coolant; 1015PSI; ICE version|Y
01|100632|11|4|L1=110mm; L4=71mm|Y
01|100632|11|5|1:1 Gear ratio; max torque M=80Nm; 6500RPM;|Y
01|100632|11|6|NO reversal of rotation direction;|Y
01|100632|11|7|Ref drwg# 00031276|Y
01|100632|11|8|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|100632|12|1|2 PC PRICING|Y
01|100632|12|2|VDI40 90 deg ER32; DIN 10889 - 69880;|Y
01|100632|12|3|Int/ Ext coolant; 1015PSI; ICE version|Y
01|100632|12|4|L1=110mm; L4=71mm|Y
01|100632|12|5|1:1 Gear ratio; max torque M=80Nm; 6500RPM;|Y
01|100632|12|6|NO reversal of rotation direction;|Y
01|100632|12|7|Ref drwg# 00031276|Y
01|100632|12|8|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|100632|13|1|3 PC PRICING|Y
01|100632|13|2|VDI40 90 deg ER32; DIN 10889 - 69880;|Y
01|100632|13|3|Int/ Ext coolant; 1015PSI; ICE version|Y
01|100632|13|4|L1=110mm; L4=71mm|Y
01|100632|13|5|1:1 Gear ratio; max torque M=80Nm; 6500RPM;|Y
01|100632|13|6|NO reversal of rotation direction;|Y
01|100632|13|7|Ref drwg# 00031276|Y
01|100632|13|8|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|100632|14|1|4 PC PRICING|Y
01|100632|14|2|VDI40 90 deg ER32; DIN 10889 - 69880;|Y
01|100632|14|3|nt/ Ext coolant; 1015PSI; ICE version|Y
01|100632|14|4|L1=110mm; L4=71mm|Y
01|100632|14|5|1:1 Gear ratio; max torque M=80Nm; 6500RPM;|Y
01|100632|14|6|NO reversal of rotation direction;|Y
01|100632|14|7|Ref drwg# 00031276|Y
01|100632|15|1|5 PC PRICING|Y
01|100632|15|2|VDI40 90 deg ER32; DIN 10889 - 69880;|Y
01|100632|15|3|nt/ Ext coolant; 1015PSI; ICE version|Y
01|100632|15|4|L1=110mm; L4=71mm|Y
01|100632|15|5|1:1 Gear ratio; max torque M=80Nm; 6500RPM;|Y
01|100632|15|6|NO reversal of rotation direction;|Y
01|100632|15|7|Ref drwg# 00031276|Y
01|100632|15|8|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|100638|2|1|Installation includes: drive unit short bar fiber|Y
01|100638|2|2|optic cables communication cables bulk head cable|Y
01|100638|2|3|set external cable set parameter changes service|Y
01|100638|2|4|time and travel|Y
01|100640|2|1|WITH T-SLOT FACEPLATE|Y
01|100640|2|2|HFO TO SUPPLY MOTORS AND CABLES|Y
01|100640|2|3|HAAS P/N 62-10023  MOTOR  P/N 32-1990 CABLES|Y
01|100641|1|1|Hydraulic Unit/Brake included|Y
01|100641|1|2|External cable set included|Y
01|100642|15|1|Retention Knob Promo: Knob can be taken at $5.00 net|Y
01|100642|15|2|each with the purchase of a matching taper holder.|Y
01|100643|1|1|AC4-MAS-160   Capto C4 Test Bar with 160mm Gage|Y
01|100644|2|1|SET OF 2 TABLES WITH ALL HARDWARE|Y
01|100644|2|2|LAYOUT NEEDED TO CONFIRM SHEETMETAL MODIFICATION|Y
01|100651|1|1|Includes extra long cable set and Haas Motors|Y
01|100661|1|1|Reference RGA# TAR-52466|Y
01|100661|1|2|NSVZ300 s/n:2069E|N
01|100663|1|1|With A11J adapter plate|Y
01|100666|1|1|Reference RGA# TAR-52468|Y
01|100666|1|2|5AX-130ZA s/n: 1703 Sent in for evaluation.|Y
01|100677|2|1|EAKMS10860020: Spindle for MS108-60000 T32247|Y
01|100684|1|1|FIT ON DOOSAN CONFIRMED WITH LIMITED TRAVEL PER|Y
01|100684|1|2|LAYOUT GIVEN|Y
01|100684|3|1|THIS TO BE A 5C DEAD LENGTH SYSTEM|Y
01|100684|4|1|Mini manifold and setup INCLUDING LEVER/SWITCH|Y
01|100684|4|2|TO OPERATE CHUCKS INDEPENDENTLY|Y
01|100684|5|1|FOR HYD. 5 C COLLET CHUCKS|Y
01|100684|7|1|EXTERNAL CABLE SET|Y
01|100691|1|1|NSVX400TMA No motor includes 8+1 RJ|Y
01|100697|1|1|Reference RGA# LVR-52462|Y
01|100697|1|2|Repair of MZQT47-ER32X-OFF s/n:7180002|Y
01|100697|1|3|(Mimatic#124034)|Y
01|100697|2|1|Bearing seals and o-rings to be replaced.|Y
01|100704|5|1|Choose either line 4(coolant thru) line 5 (down flute)|Y
01|100713|1|1|Standand Shell Mill Holder w/ Solid arbor bolt|Y
01|100713|1|2|Tool holder is coolant through but does not have exit|Y
01|100713|1|3|option for the coolant. Standard off the shelf.|Y
01|100720|2|1|Arbor screw to convert holder for coolant thru|Y
01|100735|1|1|Reference RGA# TAR-52498|Y
01|100735|1|2|CNCZ180 s/n: 12276 Sent in for evaluation|Y
01|100738|1|1|MNL0042540|Y
01|100738|2|1|MNL0115080|Y
01|100738|3|1|MNL0113810|Y
01|100739|2|1|1 END MILL HOLDER - QUICK CHANGE ADAPTER|Y
01|100739|3|1|ER40 COLLET CHUCK - QUICK CHANGE ADAPTER|Y
01|100739|4|1|3/4 SHELL MILL ARBOR - QUICK CHANGE ADAPTER|Y
01|100739|7|1|$725 INCLUDES LYNDEX NIKKEN MACHINING BLOCK TO SPEC|Y
01|100766|2|1|NBT30-C25-80|Y
01|100770|1|1|Coolant Through Type|Y
01|100783|1|1|*installed w/ HEX Style Nuts|Y
01|100783|2|1|*installed w/ HEX Style Nuts|Y
01|100805|2|1|Item is used; however in good condition and in stock.|Y
01|100811|1|1|Reference RGA# CUR-52407|Y
01|100811|1|2|Repair of H80FRAM-ER16-206ST s/n:39643 04|Y
01|100811|1|3|(Mimatic# 167594)|Y
01|100811|2|1|Bearings seals and o-rings to be replaced.|Y
01|100813|1|1|Reference RGA# TAR-52514|Y
01|100813|1|2|CNCZ202LFA s/n: 12068T Sending in for evaluation|Y
01|100821|2|1|Please Note: Discount reflects sold as is for used|Y
01|100821|2|2|Start II.|Y
01|100821|5|1|We have H63A-SF0250-3.15CP in stock $303.50 list less|Y
01|100821|5|2|42%.|Y
01|100821|6|1|We have H63A-SF0312-3.15CP in stock $303.50 list less|Y
01|100821|6|2|42%.|Y
01|100824|1|1|BMT75 X Axis ER40 Live Head|Y
01|100824|3|1|BMT75 X Axis SK Live Head|Y
01|100830|1|1|If ordered by Thursday of this week delivery 5~6 weeks.|Y
01|100830|1|2|If not delivery is still pending.|Y
01|100836|1|1|Standard Pitch 82mm|Y
01|100836|1|2|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|100852|1|1|Pricing reflects one time discount|Y
01|100852|4|1|Pricing reflects one time discount|Y
01|100853|5|1|THIS IS NET TO ELLISON|Y
01|100857|1|1|Reference RGA# TAR-52218|Y
01|100857|1|2|5AX-201 Table was not maintaining orientation on the|Y
01|100857|1|3|Tilt Axis.  Table sent in disassembled.|Y
01|100864|2|1|Installation includes: Drive unit short bar fiber|Y
01|100864|2|2|optic cable communications cable bulkhead cables|Y
01|100864|2|3|external cables parameter changes service time and|Y
01|100864|2|4|travel.|Y
01|100868|1|1|This item is non standard stock and will not be|Y
01|100868|1|2|cancelable or returnable once ordered|Y
01|100872|1|1|REPLACEMENT FOR EXISTING TABLE S/N 1556|Y
01|100876|1|1|600MM table with Haas motor and cable set.|Y
01|100876|3|1|NEED TO CHECK AC OR DC|Y
01|100885|2|1|Power and Feedback Harness|Y
01|100885|3|1|YOU MAY NOT NEED THIS UNIT. YOUR DOOSAN REQUIRES A 24V|Y
01|100885|3|2|SYSTEM CHECK THE EXISTING HYD UNIT TO SEE IF IT IS|Y
01|100885|3|3|COMPATIBLE WITH YOUR MACHINE.|Y
01|100885|4|1|THIS IS NET. COVERS CHANGING THE MOTOR TO BE COMPATIBLE|Y
01|100885|4|2|WITH FANU CONTROL AND SERVOS.|Y
01|100885|5|1|THIS IS NET TO ELLISON|Y
01|100918|1|1|Current Stock 12 pieces.|Y
01|100918|2|1|Current Stock 17 pieces.|Y
01|100918|3|1|Current Stock 8 pieces.|Y
01|100918|4|1|Current stock 11 pieces.|Y
01|100918|5|1|Current stock 6 pieces.|Y
01|100918|6|1|Current stock 11 pieces.|Y
01|100918|7|1|Current stock 5 pieces.|Y
01|100918|8|1|Current stock 3 pieces|Y
01|100918|15|1|NBT40-SF0625-6.30CP|Y
01|100918|15|2|2Lock TaperPlus NBT40 5/8 Shrink Fit Holder  With|Y
01|100918|15|3|Coolant Ports|Y
01|100933|18|1|**please confirm with machine/model|Y
01|100939|2|1|Note: Not coolant through|Y
01|100939|4|1|Collet Special pricing applied|Y
01|100952|1|1|MT-210S priced with the riser - Morise #3 Taper|Y
01|100952|1|2|Lead time for 40mm riser though us is 4 weeks|Y
01|100952|5|1|MT-210S Priced without the riser|Y
01|100955|1|1|STANDARD HIGH SPEED NIKKEN TABLE WITH NO MOTOR OR|Y
01|100955|1|2|ROTARY UNION. DELIVERY 1PC MID OCT BALANCE 2-3 MONTHS|Y
01|100955|3|1|STANDARD LEFT HAND HIGH SPEED NIKKEN ROTARY TABLE|Y
01|100955|3|2|WITH NO MOTOR OR ROTARY UNION.|Y
01|100955|3|3|DELIVERY 2PCS MID NOV. BALANCE 2-3 MONTHS|Y
01|100963|1|1|This includes Nikken A21 controller along with|Y
01|100963|1|2|interface and external cables.|Y
01|100963|1|3|The machine tool dealer will need to provide an|Y
01|100963|1|4|additional M-code to signal the rotary table control|Y
01|100963|1|5|via relay.|Y
01|100971|2|1|Power and signal cable sets|Y
01|100982|1|1|Reference RGA# LVR-52490|Y
01|100982|1|2|Repair of MZQT5-ER40Z-ICE s/n:81465 02|Y
01|100982|1|3|(Mimatic# 124877)|Y
01|100982|2|1|Bearings seals and o-rings to be placed.|Y
01|100985|1|1|Howa Chuck HO1MA12 R-1466 Standard Style|Y
01|100985|2|1|Set of Soft Jaws for Howa Chuck HO1MA12  R1466|Y
01|100987|1|1|of customer's HSK100A ER32 collet chuck|Y
01|100987|1|2|Hard balance assembly (holder collet cutting tool) to|Y
01|100987|1|3|G2.5 @ 15000RPM|Y
01|100987|1|4|Ref. Lyndex-Nikken RGA# MOD-52560|Y
01|100988|2|1|IN STOCK @ LYNDEX NIKKEN MUNDELEIN IL|Y
01|100988|5|1|IN STOCK @ LYNDEX NIKKEN MUNDELEIN IL|Y
01|100988|6|1|IN STOCK @ LYNDEX NIKKEN MUNDELEIN IL|Y
01|100988|7|1|IN STOCK @ LYNDEX NIKKEN MUNDELEIN IL|Y
01|100988|8|1|IN STOCK @ LYNDEX NIKKEN MUNDELEIN AL|Y
01|100988|9|1|IN STOCK @ LYNDEX NIKKEN MUNDELEIN IL|Y
01|100988|12|1|0/10 @ LYNDEX NIKKEN MUNDELEIN IL; 10/10 @ NIKKEN|Y
01|100988|12|2|JAPAN; WILL SHIP 10 UNITS FROM NIKKEN JAPAN UPON|Y
01|100988|12|3|RECEIPT OF ORDER FROM METAL REMOVAL TECHNOLOGIES.|Y
01|100988|13|1|8/10 @ LYNDEX NIKKEN MUNDELEIN IL; 2/10 @ NIKKEN|Y
01|100988|13|2|JAPAN; WILL SHIP 2 UNITS FROM NIKKEN JAPAN UPON|Y
01|100988|13|3|RECEIPT OF ORDER FROM METAL REMOVAL TECHNOLOGIES.|Y
01|100988|14|1|IN STOCK @ LYNDEX NIKKEN MUNDELEIN IL|Y
01|100990|1|1|Reference RGA# CUR-52382|Y
01|100990|1|2|Repair of H80FRAM-ER16-206.5-90FP s/n: 815701|Y
01|100990|1|3|(Mimatic# 167594)|Y
01|100990|2|1|Bearings seals and o-rings to be replaced.|Y
01|100990|2|2|Broken gears must be replaced.|Y
01|100990|2|3|ER16 Spindle also needs to be replaced.|Y
01|100996|6|1|Complimentary Tooling Certificate w/5AX Table Purchase|Y
01|100998|2|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|100998|2|2|External Cables Service Time & Travel.|Y
01|101002|1|1|Only 1 table. Includes the interface and cables|Y
01|101006|1|1|The table will be CNCZ100-2W-120LSABR2 with lefthand|Y
01|101006|1|2|motor.|Y
01|101011|1|1|Thread- M22xP1.5|Y
01|101011|2|1|Thread- M25x1.5|Y
01|101011|3|1|Thread- M32x1.5|Y
01|101015|2|1|SK6-1/8AC MECHANICALLY SEALED SK6 1/8 COLLET IS|Y
01|101015|2|2|NOT AVAILABLE. IT COULD POSSIBLY BE MADE AS A SPECIAL|Y
01|101017|2|1|WITH T-SLOT FACEPLATE|Y
01|101017|2|2|HFO TO SUPPLY MOTORS AND CABLES|Y
01|101017|2|3|HAAS P/N 62-10023  MOTOR  P/N 32-1990 CABLES|Y
01|101028|2|1|This 2.50 is the shortest length we have in the ER20|Y
01|101036|1|1|Quote for replacement T32005 originally sent in on|Y
01|101036|1|2|RGA# LVR-52516 for evaluation.  All 3 units are|Y
01|101036|1|3|unrepairable.  Location blocks are damaged and units|Y
01|101036|1|4|will not align properly to be adjusted.|Y
01|101039|3|1|PRE-E460B-T/I (Presetter E460N-Training & Installation)|Y
01|101040|3|1|Cable Set 10 FT. Both Axis|Y
01|101040|4|1|DMG Mori is to provide axes expansion option|Y
01|101050|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|101050|4|2|External Cables Service Time and Travel.|Y
01|101079|2|1|Quoted at NET price.|Y
01|101088|6|1|THIS IS NET TO ELLISON|Y
01|101090|3|1|***Convert 5AX-201YA from pneumatic to hydraulic brake|Y
01|101091|5|1|THIS IS NET TO ELLISON|Y
01|101100|1|1|Special - one time price|Y
01|101103|16|1|Substitution for 9/32|Y
01|101109|8|1|DRAWTUBE EXTENSION WILL BE BETWEEN $300-$500|Y
01|101119|1|1|RGA# LVR-52368|Y
01|101119|1|2|Tool #1: OKL3-ER32Z-OFMS s/n: AL0078|Y
01|101119|2|1|Spindle/gears collet nut bearings seals and o-rings|Y
01|101119|2|2|must all be replaced.|Y
01|101119|2|3|Labor is included.|Y
01|101119|2|4|Alternative(NEW): $3892.35 ($7077.00 list less 45%)|Y
01|101122|21|1|POWER/FEEDBACK CABLES FOR 4TH AXIS ROTARY TABLE|Y
01|101122|25|1|INSTALLATION INCLUDES: 4TH AXIS SERVO AMPLIFIER|Y
01|101122|25|2|BULKHEAD WIRING/CABLES NECESSARY PARAMETER CHANGES|Y
01|101122|25|3|AND ALL LYNDEX NIKKEN SERVICE PERSONS TRAVEL EXPENSES|Y
01|101124|1|1|CRITICAL DIMENSIONS FOR INTERNAL KEYWAY 1.575 X 1.811|Y
01|101124|1|2|3 NM TORQUE - 2.213 FT LBS TORQUE|Y
01|101124|2|1|CRITICAL DIMENSIONS FOR INTERNAL KEYWAY 2.087 X 2.460|Y
01|101124|2|2|10 NM TORQUE - 7.375 FT LBS TORQUE|Y
01|101155|6|1|INSTALLATION INCLUDES: 4TH AXIS SERVO AMPLIFIERS|Y
01|101155|6|2|BULKHEAD WIRING AND CONNECTIONS ROTARY TABLE MOTOR|Y
01|101155|6|3|ALSO ALL LYNDEX NIKKEN SERVICE TECH TRAVEL EXPENSES|Y
01|101162|1|1|*Motor Back Side Type|Y
01|101162|1|2|w/ Motor (ALPHA IF 30  A06B-2253-B100)|Y
01|101162|1|3|HEIDENHAIN-RCN8590F(60) Included|Y
01|101162|1|4|Model# RCN8590F (Dia. 60mm Through Hole) +/-3|Y
01|101162|1|5|Note: Cables Hydraulic Pump and Reducer NOT Included.|Y
01|101170|1|1|Tooling Certificate #25000-2068-081418|Y
01|101179|1|1|With PS-N46E pull stud|Y
01|101179|2|1|With PS-N46E|Y
01|101182|1|1|Range: 2.157-2.219|Y
01|101182|2|1|Range: 2.032-2.094|Y
01|101182|3|1|Range: 1.219-1.281|Y
01|101182|4|1|Range: .594-.656|Y
01|101182|5|1|Range: .719-.781|Y
01|101182|6|1|Range: 2.469-2.531|Y
01|101182|7|1|Range: 2.375-2.437|Y
01|101183|1|1|AC5-ECH10F-60 Capto C5/ER16 Collet Chuck|Y
01|101183|2|1|AC5-ECH10F-90 Capto C5/ER16 Collet Chuck|Y
01|101191|1|1|Quote based on 60mm std pitch|Y
01|101191|8|1|Includes #40 taper Bushing installed in Position Block|Y
01|101191|8|2|Designed and Manufactured by L&N upon receipt of|Y
01|101191|8|3|spindle drawing confirmation|Y
01|101191|8|4|*net price|Y
01|101200|2|1|CAT40U-SKO10-135 Coolant Inducer Oil Hole Fluid Head|Y
01|101200|2|2|SK10 Slim Chuck|Y
01|101237|1|1|H80FRAM-ER16-206.5-90FP|Y
01|101248|1|1|Includes Haas Motor & Cable SEt|Y
01|101248|2|1|NET PRICE|Y
01|101266|6|1|NBT40-C32-105|Y
01|101266|20|1|Please note: This item is non standard stock. Once|Y
01|101266|20|2|a purchase order is placed it cannot be cancelled or|Y
01|101266|20|3|returned.|Y
01|101266|21|1|Please note: This item is non standard stock. Once|Y
01|101266|21|2|a purchase order is placed it cannot be cancelled or|Y
01|101266|21|3|returned.|Y
01|101266|22|1|Please note: This item is non standard stock. Once|Y
01|101266|22|2|a purchase order is placed it cannot be cancelled or|Y
01|101266|22|3|returned.|Y
01|101266|26|1|Please note: This item is non standard stock. Once|Y
01|101266|26|2|a purchase order is placed it cannot be cancelled|Y
01|101266|26|3|or returned.|Y
01|101266|27|1|Please note: This item is non standard stock. Once|Y
01|101266|27|2|a purchase order is placed it cannot be cancelled or|Y
01|101266|27|3|returned.|Y
01|101275|2|1|Special Positioning Block Quoted At Net Price.|Y
01|101297|7|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|101297|9|1|INCLUDES ADDITIONAL DRIVE CONNECTORS SERVO MOTOR|Y
01|101297|9|2|FIBRE OPTIC CABLEALL INTERNAL CABLE LABOR TRAVEL|Y
01|101297|9|3|TRAINING|Y
01|101298|2|1|THIS TABLE HAS AIR BRAKE CLAMPING|Y
01|101298|4|1|EXTERNAL POWER/FEEDBACK CABLE SET ( 2 AXIS)|Y
01|101298|7|1|$ 2000 LYNDEX NIKKEN TOOL CERTIFICATE AT LIST PRICE|Y
01|101298|9|1|INCLUDES DUAL 2 AXIS AMPLIFIERS SERVO MOTORSFIBRE|Y
01|101298|9|2|OPTIC CABLES ALL CONNECTOR/HARDWARE WIRE HARNESS|Y
01|101298|9|3|TRAVEL LABOR TRAINING|Y
01|101299|4|1|CENTER HEIGHT 160-180MM|Y
01|101304|1|1|Pricing reflects onetime discount|Y
01|101305|2|1|Installation includes: Dual axis drive unit short bar|Y
01|101305|2|2|communications cables fiber optic cables bulkhead|Y
01|101305|2|3|cables external cables parameter changes service|Y
01|101305|2|4|time and travel.|Y
01|101344|2|1|Includes:|Y
01|101344|2|2|1. Hydraulic actuator for 5C System 4 units.|Y
01|101344|2|3|2. 5C spindle receptacle 4 units.|Y
01|101344|2|4|3. 5C on size collet 4 units.|Y
01|101344|3|1|Includes:|Y
01|101344|3|2|1. Power Cable and Feedback cable.|Y
01|101344|3|3|2. Connectors and cables harness.|Y
01|101344|3|4|3. Hydraulic clamping system installation.|Y
01|101344|3|5|4. Rotary Table installation on Haas machine.|Y
01|101344|3|6|5. Labor @ Eaton AGS. All expenses for 2 days.|Y
01|101344|3|7|6. >>>Amplifier must be provided by EATON/Haas<<<|Y
01|101344|3|8|7. >>>Hydraulic unit should be provided by Eaton<<<|Y
01|101353|1|1|Reference RGA# TOR-52543|Y
01|101353|1|2|CAT40-UMT200UH Stylus is broken.|Y
01|101353|3|1|Calibration service is included.|Y
01|101356|3|1|Std PB. It needs to be adjusted to machine spindle.|Y
01|101367|1|1|MNL12-SM75X-ICE Face Mill 3/4 arbor Internal Coolant|Y
01|101367|6|1|MNL12-SM10X-ICE Face Mill 1 Arbor Internal Coolant|Y
01|101376|1|1|1 pc end Nov|Y
01|101376|1|2|1 pc end January 2019|Y
01|101395|2|1|Includes:|Y
01|101395|2|2|1. Air/mechanical actuator for 5C System 3 units.|Y
01|101395|2|3|2. 5C spindle receptacle 3 units.|Y
01|101395|2|4|3. 5C on size collet 3 units.|Y
01|101395|3|1|Includes:|Y
01|101395|3|2|1. Power Cable and Feedback cable.|Y
01|101395|3|3|2. Connectors and cables harness.|Y
01|101395|3|4|3. Air/mechanical clamping system installation.|Y
01|101395|3|5|4. Rotary Table installation on Haas machine.|Y
01|101395|3|6|5. Labor @ Eaton AGS. All expenses for 2 days.|Y
01|101395|3|7|6. >>>AMPLIFIER MUST BE PROVIDED BY EATON/Haas<<<|Y
01|101399|1|1|Service call completed by Kaz on 8/29/18 on|Y
01|101399|1|2|CNC302FA-M s/n: 10421C|Y
01|101403|1|1|Service call completed by Kaz on 8/31/18 on 5AX-130|Y
01|101404|1|1|Reference RGA# TAR-52548|Y
01|101404|1|2|5AX-130SA-BR s/n: 4966 Sent in for evaluation.|Y
01|101404|32|1|Original worm screw seems to be in good condition;|Y
01|101404|32|2|however due to crash it is possible that the worm|Y
01|101404|32|3|screw is bent.  We will not be able to tell upon|Y
01|101404|32|4|assembly.|Y
01|101407|19|1|NCAT40-SF0750-6.30|Y
01|101429|3|1|Includes: drive amp bulk head cable set external|Y
01|101429|3|2|cable set fiber optic cable communication cable|Y
01|101429|3|3|travel and labor for installation.|Y
01|101429|3|4|BASED UP PERFORMING ALL 3 INSTALLATION AT SAME TIME|Y
01|101434|2|1|4 In stock. 6 Pending delivery.|Y
01|101442|1|1|NET price|Y
01|101460|2|1|Adapter Plate to mount Bison Chuck 3675-6(7-814-0600)|Y
01|101460|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|101460|4|2|External Cables Service Time & Travel.|Y
01|101461|2|1|*to hold 1 tap. other sizes same price|Y
01|101467|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|101474|5|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|101474|8|1|$1500 TOOL CERT FOR LIST PRICE LYNDEX NIKKEN V-FLANGE|Y
01|101474|8|2|HOLDERS.|Y
01|101501|1|1|*Made for L&N C40RAM-ER32-180-65TP s/n# 5111902|Y
01|101501|1|2|*Machine: Haas VF-2|Y
01|101501|1|3|Duplicating set-up on another machine. Must be this|Y
01|101501|1|4|block due to the thickness of it.|Y
01|101510|1|1|for VTL|Y
01|101520|1|1|Reference RGA# TOR-52524|Y
01|101520|1|2|Repair of PF-2|Y
01|101520|1|3|Item needs evaluation due to exposure to coolant.|Y
01|101538|4|1|Installation includes: Drive unit short bar fiber|Y
01|101538|4|2|optic cable communications cable bulkhead cable|Y
01|101538|4|3|external cablesparameter changes service time and|Y
01|101538|4|4|travel.|Y
01|101549|6|1|Quoted at Net Price|Y
01|101556|1|1|Pending price and delivery|Y
01|101556|2|1|This item priced at net pricing|Y
01|101560|1|1|Reference RGA# LVR-52549|Y
01|101560|1|2|Repair of MY2W05 s/n: AL002|Y
01|101560|2|1|Collet nut bearings seals o-rings and bearing nut|Y
01|101560|2|2|must all be replaced.|Y
01|101560|2|3|Includes Labor.|Y
01|101568|1|1|2-CNCZ205LSAR2 tables with 1000psi 6-port rotary union|Y
01|101572|1|1|Price is net price for this non stock standard item|Y
01|101572|1|2|This item is non cancelablenon returnable once order|Y
01|101572|1|3|is placed|Y
01|101576|1|1|Non-returnable Non-cancelable|Y
01|101576|2|1|Non-returnable Non-cancelable|Y
01|101583|1|1|Standalone unit with A21 independent controller.|Y
01|101583|1|2|If not already available requires single M-code from|Y
01|101583|1|3|machine control to send signal via relay.|Y
01|101583|1|4|All interface cabling is included.|Y
01|101585|2|1|Quoted as NET pricingnon-reterunablenon-cancelable|Y
01|101596|6|1|NBT40-C32-105|Y
01|101596|20|1|Please note: This item is non standard stock. Once|Y
01|101596|20|2|a purchase order is placed it cannot be cancelled or|Y
01|101596|20|3|returned.|Y
01|101596|21|1|Please note: This item is non standard stock. Once|Y
01|101596|21|2|a purchase order is placed it cannot be cancelled or|Y
01|101596|21|3|returned.|Y
01|101596|22|1|Please note: This item is non standard stock. Once|Y
01|101596|22|2|a purchase order is placed it cannot be cancelled or|Y
01|101596|22|3|returned.|Y
01|101596|26|1|Please note: This item is non standard stock. Once|Y
01|101596|26|2|a purchase order is placed it cannot be cancelled|Y
01|101596|26|3|or returned.|Y
01|101596|27|1|Please note: This item is non standard stock. Once|Y
01|101596|27|2|a purchase order is placed it cannot be cancelled or|Y
01|101596|27|3|returned.|Y
01|101601|6|1|NBT40-C32-105|Y
01|101601|20|1|Please note: This item is non standard stock. Once|Y
01|101601|20|2|a purchase order is placed it cannot be cancelled or|Y
01|101601|20|3|returned.|Y
01|101601|21|1|Please note: This item is non standard stock. Once|Y
01|101601|21|2|a purchase order is placed it cannot be cancelled or|Y
01|101601|21|3|returned.|Y
01|101601|22|1|Please note: This item is non standard stock. Once|Y
01|101601|22|2|a purchase order is placed it cannot be cancelled or|Y
01|101601|22|3|returned.|Y
01|101601|26|1|Please note: This item is non standard stock. Once|Y
01|101601|26|2|a purchase order is placed it cannot be cancelled|Y
01|101601|26|3|or returned.|Y
01|101601|27|1|Please note: This item is non standard stock. Once|Y
01|101601|27|2|a purchase order is placed it cannot be cancelled or|Y
01|101601|27|3|returned.|Y
01|101609|5|1|Miyano live; ER16 STR;Ext/ Int coolant - ICE; 1015PSI|Y
01|101609|5|2|L=40mm;1:1 Gear ratio; max torque 50Nm; 12000RPM;|Y
01|101609|5|3|ref drwg# 00044949|Y
01|101609|5|4|3 PC PRICING|Y
01|101609|5|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|101609|6|1|Miyano live; ER16 STR;Ext/ Int coolant - ICE; 1015PSI|Y
01|101609|6|2|L=40mm;1:1 Gear ratio; max torque 50Nm; 12000RPM;|Y
01|101609|6|3|ref drwg# 00044949|Y
01|101609|6|4|5 PC PRICING|Y
01|101609|6|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|101609|7|1|Miyano live; ER16 90deg;Ext/ Int coolant - ICE; 1015PSI|Y
01|101609|7|2|L1=60mm;1:1 Gear ratio; max torque 25Nm; 6500RPM;|Y
01|101609|7|3|Output is reversal to input:ref drwg# 00037742|Y
01|101609|7|4|3 PC PRICING|Y
01|101609|7|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|101609|8|1|Miyano live; ER16 90deg;Ext/ Int coolant - ICE; 1015PSI|Y
01|101609|8|2|L1=60mm;1:1 Gear ratio; max torque 25Nm; 6500RPM;|Y
01|101609|8|3|Output is reversal to input:ref drwg# 00037742|Y
01|101609|8|4|5 PC PRICING|Y
01|101609|8|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|101612|1|1|Reference RGA# TAR-52586|Y
01|101612|1|2|CNC400HFA-6P-3P s/n: 6091|Y
01|101639|4|1|Check Threads|Y
01|101652|1|1|Reference RGA# LVR-52587|Y
01|101652|1|2|Repair of OKL3-ER32Z s/n: AL372 (Alps# OK101-13000)|Y
01|101652|1|3|Tool is seized up.|Y
01|101652|2|1|Collet nut bearings seals and o-rings must be|Y
01|101652|2|2|replaced.  Labor is included.|Y
01|101654|1|1|Reference RGA# QUA-52469|Y
01|101654|1|2|Repair of MRAM-MI40-IC s/n: 65612 01|Y
01|101654|1|3|(Mimatic# 159994)|Y
01|101654|2|1|Bearings seals and o-rings to be replaced.|Y
01|101666|5|1|Installation includes: Bulkhead cable external cables|Y
01|101666|5|2|parameter changes service time and travel.|Y
01|101666|5|3|INTERFACE IN MACHINE ONLY THE AMPLIFIER CAN BE USED|Y
01|101666|5|4|MACHINE DATA SHEETS WILL NEED TO BE REVIEWED|Y
01|101693|2|1|16C collet closer with hydraulic pancake cylinder.|Y
01|101693|2|2|Includes nose piece draw tube and cylinder.|Y
01|101693|3|1|Hydraulic pump for collet closers.|Y
01|101695|2|1|*comes with solid arbor screw|Y
01|101695|4|1|2.75 gl|Y
01|101701|2|1|NC4006-16-3.00|Y
01|101702|1|1|H63A(80)-12HC-3.898-ID Hydraulic Chuck UNV# 444|Y
01|101702|2|1|H63A(80)-12HC-3.898-ID Hydraulic Chuck UNV# 444|Y
01|101702|3|1|H63A(80)-12HC-3.898-ID Hydraulic Chuck UNV# 444|Y
01|101705|1|1|C5046-0250-10.00 CAT50 1/4 ID 10GL EMH Quote 2 or min|Y
01|101705|2|1|C5036-1500-10.00 CAT50 1.5ID 10GL EMH Quote 1 or min|Y
01|101724|3|1|**Not ICE type|Y
01|101725|1|1|Repeat INQ|Y
01|101725|1|2|JPY153450/ea($1=JPY110)|N
01|101728|6|1|NOT SURE WHICH GAGE LENGTH WORKS BETTER|Y
01|101728|8|1|NOT SURE WHICH GAGE LENGTH WORKS BEETER|Y
01|101745|1|1|CAT45-C1-115|Y
01|101751|3|1|10FT. Cable Set|Y
01|101751|4|1|COMPLETE 5TH AXIS INSTALLATION. SERVO MOTOR ADDITIONAL|Y
01|101751|4|2|AXIS DRIVE INTERNAL CABLES FIBRE OPTICS ALL|Y
01|101751|4|3|CONNECTORS TRAVEL AND LABOR.|Y
01|101765|1|1|H63A(80)-HC12-3.898 Hydraulic Chuck per UNV#444|Y
01|101765|2|1|H63A(80)-HC12-3.898 Hydraulic Chuck per UNV#444|Y
01|101765|3|1|H63A(80)-HC12-3.898 Hydraulic Chuck per UNV#444|Y
01|101769|1|1|Reference RGA# CUR-52580|Y
01|101769|1|2|Repair of C40RA-0025M s/n: 49928-19|Y
01|101769|1|3|(Mimatic# 175241)|Y
01|101769|2|1|Bearings seals and o-rings to be replaced.|Y
01|101770|1|1|Net Price Quoted|Y
01|101770|2|1|Net Price Quoted|Y
01|101784|4|1|In stock option to tool above in line item 3|Y
01|101798|2|1|Cable Set Both Axis up to 2m|Y
01|101813|2|1|***Does not come with Makino Pins|Y
01|101826|2|1|**Core Buy Back Pricing**|Y
01|101826|4|1|**Qty Break Pricing**  Core Buy Back Program**|Y
01|101827|3|1|Replaces MT-135-003B|Y
01|101831|1|1|NET PRICING; ADD YOUR MARGIN TO THIS PRICE|Y
01|101839|2|1|*Qty 10-24pcs|Y
01|101842|1|1|MotorExternal CableInterface Cable NOT INCLUDED.|Y
01|101842|1|2|Extra Long Motor Cover + Motor Gear Required.(4weeks)|Y
01|101847|2|1|1.575 X 1.804|Y
01|101847|3|1|2.087 X 2.460|Y
01|101847|4|1|2.087 X 2.578|Y
01|101847|5|1|2.362 X 2.914|Y
01|101868|1|1|1-1/2 5c Hex Collet|Y
01|101873|1|1|C5026-1000A-8.00|Y
01|101873|1|2|CAT50 1in End Mill Holder Aerospace|Y
01|101873|1|3|Quoted as Net pricing|Y
01|101884|1|1|NBT50-FMB25.4-4.45 2-LOCK Face Mill Arbor|Y
01|101884|1|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|101884|3|1|NBT50-FMB38.1-45    2-Lock Face Mill Arbor|Y
01|101884|3|2|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|101884|4|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|101884|5|1|NBT50-SK16C-105  2-LOCK SLim Collet Chuck|Y
01|101884|5|2|Quoted as Net pricingnon-returnableNon-cancelable|Y
01|101884|6|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|101884|7|1|NBT50-SK25C-105    2-Lock Slim Collet Chuck|Y
01|101884|7|2|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|101884|8|1|NBT50-C25-105   2-Lock Milling Chuck|Y
01|101884|8|2|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|101884|9|1|NBT50-C32-90    2-Lock Milling Chuck|Y
01|101884|9|2|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|101896|3|1|$1000 L-N tool cert|Y
01|101916|1|1|Nikken NCS-10.05 Reamer ST 10.05mm NC Sensor|Y
01|101916|1|2|Quoted as 1~2 reamers.|Y
01|101916|2|1|Nikken NCS-10.05 Reamer ST 10.05mm NC Sensor|Y
01|101916|2|2|Quoted as 3~4 reamers.|Y
01|101916|3|1|Nikken NCS-10.05 Reamer ST 10.05mm NC Sensor|Y
01|101916|3|2|Quoted as 5~9 reamers.|Y
01|101916|5|1|Nikken NCS-10.1 Reamer ST 10.1mm NC Sensor|Y
01|101916|5|2|Quoted 1~2 reamers.|Y
01|101916|6|1|Nikken NCS-10.1 Reamer ST 10.1mm NC Sensor|Y
01|101916|6|2|Quoted 3~4 reamers.|Y
01|101916|7|1|Nikken NCS-10.1 Reamer ST 10.1mm NC Sensor|Y
01|101916|7|2|Quoted 5~9 reamers.|Y
01|101979|2|1|cross from WTO 420532019-60 / Mori# T32216|Y
01|101979|7|1|cross from WTO 413002000-60|Y
01|101980|24|1|***MINI NUT STYLE DISCONTINUED****|Y
01|101980|25|1|***Gauge Length is 5.65''***|Y
01|101980|26|1|***Gauge Length is 6.48''***|Y
01|101980|27|1|***MINI NUT STYLE DISCONTINUED***|Y
01|101980|28|1|***Gauge Length 6.68''***|Y
01|102007|2|1|4th/5th Axis External Cable System|Y
01|102013|1|1|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|102013|2|1|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|102013|3|1|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|102013|3|2|2 SETS=6 PCS|Y
01|102034|28|1|Quoted as option in place of 3pcs CAT40-VC6-120U|Y
01|102039|1|1|Tool 1|Y
01|102039|2|1|Tool 2|Y
01|102039|3|1|Tool 3|Y
01|102039|5|1|Tool 4|Y
01|102039|6|1|Tool 5|Y
01|102039|8|1|Tool 6|Y
01|102039|9|1|Tool 7 (Option 1)|Y
01|102039|10|1|Tool 7 (Option 2 with line 11)|Y
01|102039|11|1|Tool 7 (Option 2 with line 10)|Y
01|102039|12|1|Tool 8|Y
01|102039|13|1|Tool 9 (Option 1)|Y
01|102039|14|1|Tool 9 (Option 2 with line 15)|Y
01|102039|15|1|Tool 9 (Option 2 with line 14)|Y
01|102039|16|1|Tool 10|Y
01|102039|17|1|Tool 11|Y
01|102039|18|1|Tool 12 (Option 1)|Y
01|102039|19|1|Tool 12 (Option 2 with line 20)|Y
01|102039|20|1|Tool 12 (Option 2 with line 19)|Y
01|102039|21|1|Tool 13|Y
01|102039|22|1|Tool 14|Y
01|102039|23|1|Tool 14 for coolant|Y
01|102039|24|1|Tool 15|Y
01|102039|25|1|Tool 15 for coolant|Y
01|102039|26|1|Tool 16|Y
01|102042|1|1|Reference RGA# TAR-52419|Y
01|102042|1|2|CNCZ201LSA s/n:8037|N
01|102043|1|1|Reference RGA# TAR-52527|Y
01|102043|1|2|5AX-201 s/n: 4217 Table was in rotation and just|Y
01|102043|1|3|stopped moving.|Y
01|102043|50|1|Recommended to replace|Y
01|102043|51|1|Recommended to replace|Y
01|102044|1|1|BMT65-ER25-ADJ|Y
01|102044|1|2|BMT65; ER25; ADJUSTABLE LIVE ANGLE HEAD. L=144mm;|Y
01|102044|1|3|EXTERNAL COOLANT MAX 1015 PSI; 1:1 GEAR RATIO; MAX|Y
01|102044|1|4|24 Nm TORUE; 6500 RPM; REF DRW# 00054133|Y
01|102044|2|1|BMT65-SM1/2X|Y
01|102044|2|2|BMT65; FACEMILL BOLT 1/2 DIA 11/16 LENGTH 1/4-28UNF|Y
01|102044|2|3|***ARBOR SCREW NOT INCLUDED-PLEASE CONFIRM SIZE WITH|Y
01|102044|2|4|CUSTOMER***|Y
01|102044|2|5|ETERNAL COOLANT 1015PSI; L1=68.5mm; 1:1 GEAR RATIO;|Y
01|102044|2|6|MAX 70Nm TORQUE; 10000 RPM; REF DRWG#00054734|Y
01|102055|1|1|Please note your PF-2 must be calibrated once the|Y
01|102055|1|2|stylus has been replaced.|Y
01|102065|1|1|Ref. Howa part# H037M5|Y
01|102065|1|2|Repl for Howa part# H027M5|Y
01|102068|2|1|Fanuc Feedback Cable|Y
01|102068|3|1|Fanuc Power Cable|Y
01|102068|4|1|2 work days by our specialist @ CDMX|Y
01|102068|4|2|Includes all travel expenses and labor|Y
01|102069|1|1|1x set of 2x tables for Brother R650|Y
01|102071|1|1|Reference RGA# TOR-52598|Y
01|102071|1|2|Repair of PF-2|Y
01|102071|4|1|Recalibration is required.|Y
01|102082|21|1|*Net price|Y
01|102124|2|1|1x free|Y
01|102124|21|1|1x free|Y
01|102132|1|1|Have previously ordered a postioning block|Y
01|102137|6|1|NBT40-C32-105|Y
01|102137|20|1|Please note: This item is non standard stock. Once|Y
01|102137|20|2|a purchase order is placed it cannot be cancelled or|Y
01|102137|20|3|returned.|Y
01|102137|21|1|Please note: This item is non standard stock. Once|Y
01|102137|21|2|a purchase order is placed it cannot be cancelled or|Y
01|102137|21|3|returned.|Y
01|102137|22|1|Please note: This item is non standard stock. Once|Y
01|102137|22|2|a purchase order is placed it cannot be cancelled or|Y
01|102137|22|3|returned.|Y
01|102137|26|1|Please note: This item is non standard stock. Once|Y
01|102137|26|2|a purchase order is placed it cannot be cancelled|Y
01|102137|26|3|or returned.|Y
01|102137|27|1|Please note: This item is non standard stock. Once|Y
01|102137|27|2|a purchase order is placed it cannot be cancelled or|Y
01|102137|27|3|returned.|Y
01|102141|1|1|Daiwoo BMT65;ER32Z-Axis;L1=100mm:|Y
01|102141|1|2|Drive spindle 2 flattened 9.94mm length 112mm:|Y
01|102141|1|3|1:1 Gear ratio;max 70Nm; 10000 RPM|Y
01|102141|1|4|Direction of rotation reversal|Y
01|102141|1|5|Int/Ext coolant 1015 PSI|Y
01|102141|1|6|Ref Drawing #00054661 (mim #193704)|Y
01|102141|3|1|Daiwoo BMT65; ER32 Z-Axiz L1=100mm|Y
01|102141|3|2|Drive spindle 2 flattened .94mm length 112mm|Y
01|102141|3|3|1:1 Gear ratio; max 70Nm; 10000RPM;|Y
01|102141|3|4|Direction of rotation reversal;|Y
01|102141|3|5|Int/ Ext coolant 1015 PSI;|Y
01|102141|3|6|Ref drwg# 00054661 (mim#193704)|Y
01|102142|2|1|HSK100A-2000A-5.00|Y
01|102146|3|1|Installation includes: drive unit short bar fiber|Y
01|102146|3|2|optic cables communication cables bulk head cable|Y
01|102146|3|3|set external cable set parameter changes service|Y
01|102146|3|4|time and travel|Y
01|102149|1|1|INCLUDES CABLES/NEW SERVO MOTORS|Y
01|102149|2|1|USING BOOSTER PROVIDES CNCZ260 WITH 1568Nm BRAKE TORQUE|Y
01|102150|1|1|BRAKE TORQUE 900Nm|Y
01|102151|3|1|*** MNL12-CAPTO4X-10K ***|Y
01|102151|3|2|(OD Mill Head Capto C4 quick change 10k rpm)|Y
01|102152|1|1|ALPHA 4 MOTORS TO BE PROVIDED BY DORIAN|Y
01|102152|2|1|INCLUDES WIRES AND CABLES|Y
01|102152|3|1|SCALE KIT FOR 5AX-2002FA|Y
01|102156|1|1|Reference RGA# TAR-52420|Y
01|102156|1|2|CNC321AA21 s/n: 10444|N
01|102157|3|1|Will sell as-is or PLUG DIN HOLES|Y
01|102157|3|2|at n/c|Y
01|102169|1|1|1568Nm BRAKING TORQUE|Y
01|102169|7|1|INCLUDES SERVO AMP FOR FANUC Oi CONTROL|Y
01|102169|7|2|COST IS NET TO HILLAY|Y
01|102187|1|1|1760 Nm OF BRAKING TORQUE|Y
01|102187|7|1|INCLUDES SERVO AMP FOR FANUC Oi CONTROL|Y
01|102187|7|2|COST IS NET TO HILLARY|Y
01|102189|1|1|Range: 1.219-1.281|Y
01|102196|3|1|The back cover for the internal coolant boring bar|Y
01|102196|3|2|holder. Set consists of 3 back plates + 3 O-ring +|Y
01|102196|3|3|6 screws.|Y
01|102223|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|102223|4|2|External Cables Service Time and Travel.|Y
01|102235|1|1|Non-returnable Non-cancelable|Y
01|102243|6|1|NBT40-C32-105|Y
01|102243|20|1|Please note: This item is non standard stock. Once|Y
01|102243|20|2|a purchase order is placed it cannot be cancelled or|Y
01|102243|20|3|returned.|Y
01|102243|21|1|Please note: This item is non standard stock. Once|Y
01|102243|21|2|a purchase order is placed it cannot be cancelled or|Y
01|102243|21|3|returned.|Y
01|102243|22|1|Please note: This item is non standard stock. Once|Y
01|102243|22|2|a purchase order is placed it cannot be cancelled or|Y
01|102243|22|3|returned.|Y
01|102243|26|1|Please note: This item is non standard stock. Once|Y
01|102243|26|2|a purchase order is placed it cannot be cancelled|Y
01|102243|26|3|or returned.|Y
01|102243|27|1|Please note: This item is non standard stock. Once|Y
01|102243|27|2|a purchase order is placed it cannot be cancelled or|Y
01|102243|27|3|returned.|Y
01|102248|1|1|HSK80A BLANK BAR - TESSMA PART thb.ha080.002|Y
01|102248|1|2|NET PRICING NON-CANCELLABLE NON-RETURNABLE|Y
01|102248|1|3|20 PIECE PRICING|Y
01|102248|2|1|HSK80A BLANK BAR - TESSMA PART thb.ha080.002|Y
01|102248|2|2|50 PIECE PRICING|Y
01|102248|2|3|NET PRICING NON-CANCELLABLE NON-RETURNABLE|Y
01|102249|2|1|In stock alternative|Y
01|102254|2|1|Thread adapter is blank and requires machining|Y
01|102256|2|1|321MM ROTARY TABLE WITH RIGHT MOUNTED MOTOR|Y
01|102256|3|1|321MM ROTARY TABLE WITH LEFT MOUNTED MOTOR|Y
01|102256|4|1|401MM ROTARY TABLE WITH BACK MOUNTED MOTOR|Y
01|102256|5|1|401MM ROTARY TABLE WITH RIGHT MOUNTED MOTOR|Y
01|102256|6|1|401MM ROTARY TABLE WITH LEFT MOUNTED MOTOR|Y
01|102257|1|1|NON COOLANT THRU TAPER FOR 2 HEADS|Y
01|102257|2|1|INTERNAL COOLANT TAPER FOR COOLANT THRU HEAD|Y
01|102257|4|1|HEAD FOR 10-24 TAP|Y
01|102257|5|1|COOLANT THRU HEAD FOR COOLTANT THRU DRILLING OP|Y
01|102257|6|1|HEAD FOR 1 END MILL WITH 5/8 SHANK|Y
01|102258|1|1|PRICE INCLUDES ALPHA 21 CONTROL.|Y
01|102258|1|2|WIRED FOR 208V 3 PHASE POWER|Y
01|102259|1|1|250MM Manual Tilting Rotary table with CONTROLLER|Y
01|102259|1|2|ACTUAL PART # NST-250AA21|Y
01|102276|1|1|PRICE INCLUDES ALPHA 21 CONTROL|Y
01|102276|1|2|WIRED FOR 208V 3 PHASE POWER|Y
01|102279|1|1|PRICE INCLUDES ALPHA 21 CONTROL|Y
01|102279|1|2|WIRED FOR 208V 3 PHASE POWER|Y
01|102286|2|1|Installation includes: drive unit short bar fiber|Y
01|102286|2|2|optic cables communication cables bulk head cable|Y
01|102286|2|3|set external cable set parameter changes service|Y
01|102286|2|4|time and travel|Y
01|102293|1|1|Reference RGA# LVR-52622|Y
01|102293|1|2|Repair of customer's OKL3-ER32Z s/n: AL709|Y
01|102293|1|3|(Alps# OK101-13000)|Y
01|102293|2|1|Bearings Seals Collet Nut Spindle and Clutch|Y
01|102293|2|2|to be replaced.|Y
01|102338|2|1|NON-COOLANT THRU SPINDLE TAPERS FOR EM & TAP|Y
01|102338|3|1|COOLANT THRU SPINDLE TAPER FOR DRILLING HEAD|Y
01|102338|6|1|NON COOLANT THRU HEAD FOR TAPPING OPERATION|Y
01|102338|7|1|COOLANT THRU HEAD FOR DRILLING OPERATION|Y
01|102338|8|1|NON COOLANT THRU SLIM HEAD FOR END MILL OPERATION|Y
01|102338|17|1|5/8 COLLET FOR 1 END MILL (SHANK TURNED TO 5/8)|Y
01|102338|18|1|COOLANT THRU COLLET FOR #25 DRILLING OPERATION|Y
01|102338|19|1|ER25 TAP COLLET FOR 10-24 TAP|Y
01|102348|2|1|Cable Set up to 2m|Y
01|102380|1|1|*5pc MIN|Y
01|102380|4|1|*5pc MIN|Y
01|102380|8|1|*5pc MIN|Y
01|102380|11|1|*5pc MIN|Y
01|102389|1|1|Per Bob these must be ground all the way around.He said|Y
01|102389|1|2|Cindy T had confirmed these are ground|Y
01|102402|1|1|Replacement for AACOA NHX6300 Machine - CAT50|Y
01|102428|3|1|Installation includes:Drive unit short bar fiber|Y
01|102428|3|2|optic cable communications cable bulkhead cables|Y
01|102428|3|3|external cables parameter changes service time|Y
01|102428|3|4|and travel.|Y
01|102436|2|1|Non new used inventory used once for a demo. This|Y
01|102436|2|2|item has been inspected for resale as a used part|Y
01|102436|2|3|This item is non cancelable or returnable and is being|Y
01|102436|2|4|offered at a ONE TIME NET PRICE as used inventory sale|Y
01|102437|1|1|Package includes:CNC202AA21 table with external cable|Y
01|102437|1|2|set control box with pendantM-code cable power cable|Y
01|102437|1|3|and RS-232|Y
01|102448|1|1|CNC400HFA-6P+3P.|Y
01|102448|1|2|Rotary Table 400mm Horiz. no motor. no cable.|Y
01|102448|1|3|RJ 6P+3P|Y
01|102448|1|4|not cancelable not refundable after PO|Y
01|102470|2|1|Installation includes: Bulkhead cable set external|Y
01|102470|2|2|cable set parameter changes service time and|Y
01|102470|2|3|travel.|Y
01|102472|2|1|PRICE INCLUDES BOOSTER CONVERSION KIT AND INSTALL|Y
01|102477|1|1|3 pcs in stock will be replaced by TCE-97213|Y
01|102536|1|1|13170-2113-092618|Y
01|102540|1|1|2 PCS STOCK 3 WKS 1 PC ETA 8 WKS|Y
01|102540|1|2|Quoted as NET pricingNon-returnable Non-cancelable|Y
01|102543|1|1|Tables in stock faceplates pending|Y
01|102547|2|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|102547|3|1|HSK63F-SK25-200|Y
01|102547|3|2|Quoted as NET pricingnon-returnable non-cancelable|Y
01|102553|1|1|REPAIR OF TAT-250|Y
01|102553|1|2|REBUILD OF SEALS FOR BRAKING SYSTEM|Y
01|102553|1|3|QUOTE INCLUDES SEALS/O-RINGS + LABOR|Y
01|102556|5|1|12 CHUCK FOR CNC-501|Y
01|102556|9|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|102557|1|1|82046  HSK63A-BB2.50-13.00|Y
01|102557|3|1|82046  HSK63A-BB2.50-13.00|Y
01|102579|6|1|MZQT47-CAPTO4X-OFF-C|Y
01|102579|6|2|Mazak Live X-axis Ver Str CAPTO C4 Offsett ICE|Y
01|102579|6|3|Quoted at NET price.|Y
01|102579|7|1|MZQT47-CAPTO4Z-ICE|Y
01|102579|7|2|Mazak Live Z-axis Hor 90deg Capto C4 ICE <H-Type>|Y
01|102579|7|3|Quoted at NET price.|Y
01|102591|1|1|Reference RGA# TAR-52582|Y
01|102591|1|2|5AX-2MT-170-200FA s/n: 2001 Talb ehas slack on the|Y
01|102591|1|3|tilt axis.|Y
01|102591|28|1|M2171R114: Gasket|Y
01|102625|1|1|We do have a 5AX-201FA-M-AHB in stock this has a|Y
01|102625|1|2|Air/Hydraulic Booster Brake for the same pricing|Y
01|102625|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|102625|4|2|External Cables Service Time & Travel.|Y
01|102627|53|1|Quoted as NET pricing non-returnable non-cancelebale|Y
01|102628|1|1|IMTS UNIT SPECIAL PRICING|Y
01|102631|2|1|EXTERNAL CABLE SET FOR DD MOTOR TABLE|Y
01|102631|3|1|Installation by our specialt during two days at|Y
01|102631|3|2|Customer facilities.|Y
01|102631|3|3|Labor and all travel expenses included.|Y
01|102633|2|1|Tilt and Rotary axis scales for +/-6 seconds tilt|Y
01|102633|2|2|and +/-4 seconds rotary axis accuracy.|Y
01|102633|3|1|Includes dual axis drive unit interface cable|Y
01|102633|3|2|external cable fiber optic cable communications cable|Y
01|102633|3|3|service time and travel|Y
01|102656|1|1|WITHOUT MOTOR|Y
01|102661|1|1|11 in-stk9 2-wks 40 3-months|Y
01|102682|4|1|*** 60mm 120mm & 150mm also available ***|Y
01|102682|10|1|***************************************|Y
01|102682|10|2|* 60mm 120mm & 150mm also available *|Y
01|102697|1|1|NEED TO VERIFY CONTROL IS A FANUC Oi-MD|Y
01|102697|1|2|PLEASE SEND DATA SHEET|Y
01|102697|5|1|COST IS NET TO ELLISON|Y
01|102697|5|2|COST INCLUDES SERVO AMPS|Y
01|102697|5|3|FIRST AVAILABLE INSTALL DATE IS NOV 15|Y
01|102707|1|1|demo type used unit.|Y
01|102719|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|102719|2|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|102724|5|1|INCLUDES SERVO AMP|Y
01|102724|5|2|COST IS NET TO HILLARY MACHINERY|Y
01|102725|5|1|INCLUDES RISER FOR 310MM CENTER HEIGHT|Y
01|102725|5|2|TAILSTOCK IS IN STOCK LEAD TIME IS FOR RISER|Y
01|102725|6|1|INCLUDES SERVO AMP|Y
01|102725|6|2|COST IS NET TO HILLARY MACHINERY|Y
01|102726|6|1|INCLUDES SERVO AMP|Y
01|102726|6|2|COST IS NET TO HILLARY MACHINERY|Y
01|102741|1|1|COST TO CONVERT EXISITING CNC-260MA-M to CNC-260FA-M|Y
01|102741|1|2|COMPATABLE FOR MATSUURA VX-1000|Y
01|102741|1|3|INCLUDES FANUC SERVO MOTOR INNER POWER/FEEDBACK WIRE|Y
01|102741|1|4|HARNESS CONNECTORS AND LABOR. TABLE NEEDS TO BE|Y
01|102741|1|5|RETURNED TO LYNDEX NIKKEN|Y
01|102741|5|1|POWER/FEEDBACK/SIGNAL WIRE HARNESS INSIDE TABLE|Y
01|102741|8|1|INSTALLATION KIT ITEMIZED BELOW|Y
01|102741|12|1|SPECIAL FEEDBACK CABLE FOR MATSUURA (KEYS)|Y
01|102741|16|1|COMMUNICATIONS CABLE  A660-2005-T626/L150R0A|Y
01|102742|1|1|Reference RGA# TOR-52643|Y
01|102742|1|2|Repair of PF-2|Y
01|102742|3|1|LR1-N 1.5V Batteries|Y
01|102742|4|1|Re-calibration is included.|Y
01|102744|1|1|5AX-4MT-105-120OSP4 is correct part # when ordering|Y
01|102755|1|1|Reference RGA# TAR-52697|Y
01|102755|1|2|TAT-250 s/n: 3742|N
01|102796|1|1|CNC401LOSP4-M is the correct part number when ordering|Y
01|102796|1|2|Booster and External Cables Included|Y
01|102812|1|1|Reference RGA# TAR-52639|Y
01|102812|1|2|CNCZ180LYA-BR s/n: 10786|N
01|102812|24|1|Normal Delivery is 2-3 Weeks.|Y
01|102812|24|2|Expedited Delivery quoted to be completed 1 week from|Y
01|102812|24|3|receipt of approval to proceed.|Y
01|102846|1|1|Start 2 package price includes 10 holders|Y
01|102846|7|1|Alt size 160 not available.  Not included in package|Y
01|102846|7|2|pricing.|Y
01|102847|1|1|BMT85-ER40X-55|Y
01|102847|1|2|BMT85; ER40; STRAIGHT; L=55MM; 1:1 GEAR RATIO; MAX|Y
01|102847|1|3|200Nm TORQUE; 6000 RPM; REF DWG# 00054788|Y
01|102847|2|1|SAME DESCRIPTION AS LINE ITEM 1; INCREASED QUANTITY|Y
01|102847|2|2|DISCOUNT.|Y
01|102847|3|1|SAME DESCRIPTION AS LINE ITEM 1; INCREASED QUANTITY|Y
01|102847|3|2|DISCOUNT.|Y
01|102857|1|1|ROUGHING|Y
01|102857|2|1|SEMI ROUGHING|Y
01|102857|3|1|FINISHING|Y
01|102857|3|2|ALSO SMALL FLATS ON SHAFT|Y
01|102857|4|1|ROUGH/FINISH WORK BOTH FLATS|Y
01|102857|5|1|ROUGH/FINISH TURNING FOR SMALL SHAFTS BOTH SIDES|Y
01|102857|6|1|CUT-OFF HOLDER FOR HAND OF TO SUB SPINDLE|Y
01|102909|3|1|Please Note: This item is non-standard stock. Once|Y
01|102909|3|2|a purchase order is placed it cannot be cancelled|Y
01|102909|3|3|or returned.|Y
01|102911|2|1|NET PRICE|Y
01|102911|2|2|Includes Drive Unit Parameter Changes Service Time|Y
01|102911|2|3|Cables|Y
01|102916|1|1|2pcs due in 1-2 weeks 2 pcs delivery pending|Y
01|102942|26|1|2 stock/10 pcs end Oct/Bal pending.|Y
01|102954|1|1|Reference RGA# TAR-52641|Y
01|102954|1|2|CNCZ180 s/n: 20539T|N
01|102955|4|1|Stand is an optional addition|Y
01|102970|2|1|Installation includes: drive unit short bar fiber|Y
01|102970|2|2|optic cables communication cables bulk head cable|Y
01|102970|2|3|set external cable set parameter changes service|Y
01|102970|2|4|time and travel|Y
01|102972|1|1|250MM Manual Tilting Rotary table with CONTROLLER|Y
01|102972|1|2|ACTUAL PART # NST-250AA21|Y
01|102972|3|1|IN STOCK AT LYNDEX NIKKEN|Y
01|102986|1|1|INCLUDES 2 2MM HOLES AT FACE OF PILOT.|Y
01|103008|1|1|Ref: custome DWG# FA-1056-T1|Y
01|103008|1|2|Tolerance: 0/-0.005  Min. Order Qty. : 10|Y
01|103008|1|3|Special Order. Unit Price Each.|Y
01|103008|2|1|PF-RMSS-10.566  Ref: custome DWG# FA-1056-T1|Y
01|103008|2|2|Tolerance: 0/-0.005  Min.Order Qty: 10|Y
01|103008|2|3|Special Order. Unit Price Each.|Y
01|103008|3|1|PF-RMSS-13.0  Ref: custome DWG# RSW-1546ATIN|Y
01|103008|3|2|Tolerance: 0/-0.005  Min. Order Qty. : 10|Y
01|103008|3|3|Special Order. Unit Price Each.|Y
01|103008|4|1|PF-RMSS-15.943  Ref: custome DWG# RSW-1546ATIN|Y
01|103008|4|2|Tolerance: 0/-0.005  Min. Order Qty. : 10|Y
01|103008|4|3|Special Order. Unit Price Each.|Y
01|103008|5|1|RMSS-7.0  Ref: custome DWG# FA-8792-T1|Y
01|103008|5|2|Tolerance: 0/-0.005  Min. Order Qty. : 10|Y
01|103008|5|3|Special Order. Unit Price Each.|Y
01|103008|6|1|RMSS-8.792  Ref: custome DWG# FA-8792-T1.|Y
01|103008|6|2|Tolerance: +0.026/+0.021 (0/-0.005 is also availalbe|Y
01|103008|6|3|same P/D)  Min. Order Qty. : 10|Y
01|103008|6|4|Special Order. Unit Price Each.|Y
01|103008|7|1|PF-RMSS-12.0  Ref: custome DWG# FA-1420|Y
01|103008|7|2|Tolerance: 0/-0.005  Min. Order Qty. : 10|Y
01|103008|7|3|Special Order. Unit Price Each.|Y
01|103008|8|1|PF-RMSS-14.2  Ref: custome DWG# FA-1420|Y
01|103008|8|2|Tolerance: +0.026/+0.021 (0/-0.005 is also availalbe|Y
01|103008|8|3|@ same P/D)  Min. Order Qty. : 10|Y
01|103008|8|4|Special Order. Unit Price Each.|Y
01|103026|6|1|1 free collet comes with this tool Butler SK Collet|Y
01|103026|6|2|PROMO.|Y
01|103062|1|1|Reference RGA# QUA-52619|Y
01|103062|1|2|Repair of MZMP47-ER16-AD-HS s/n:74022 01|Y
01|103062|1|3|(Mimatic# 125053)|Y
01|103062|2|1|Bearings seals and o-rings to be replced.|Y
01|103062|2|2|Input gears also need to be replaced.|Y
01|103063|3|1|Quoted at Net Price and non returnable.|Y
01|103066|2|1|HFO TO SUPPLY MOTORS AND CABLE TO LYNDEX NIKKEN|Y
01|103066|2|2|TABLES IN STOCK. CONVERSION PARTS NEEDED. 4-6 WEEK ARO|Y
01|103066|4|1|$3000 LIST PRICE TOOL CERT AT NO CHARGE|Y
01|103068|1|1|1-pc arriving today to L-N/ 1pc due at L-N 11/19|Y
01|103073|1|1|Item is non stock standard.Once oredered it can not be|Y
01|103073|1|2|cancelled or returned|Y
01|103076|3|1|Includes Installation Drive Units Bulkhead Cables|Y
01|103076|3|2|External Cables Service Time & Travel|Y
01|103076|4|1|$1000.00 Complimentary Tooling Certificate for End User|Y
01|103076|4|2|with purchase of 5AX-201FA-M Rotary Table.|Y
01|103077|4|1|Item is non stock standard special which is once|Y
01|103077|4|2|ordererd is not cancelable or returnable|Y
01|103079|1|1|1-14 pieces discount 30%|Y
01|103079|2|1|15 pcs and over 33% discount|Y
01|103089|1|1|Reference RGA# TAR-52574|Y
01|103089|1|2|CNC260TSA-M s/n: 1079 Sent in for evaluation.|Y
01|103089|22|1|A06B-0128-B089: Fanuc Motor|Y
01|103090|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|103090|2|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|103090|3|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|103090|4|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|103110|2|1|Includes Installation Drive Units Bulkhead Cables|Y
01|103110|2|2|External Cables Service Time & Travel|Y
01|103123|24|1|Holds .275-.255 for the .2656|Y
01|103123|25|1|Holds (.216-.177)  for .201|Y
01|103123|26|1|Holds  (.275-.255) for .257|Y
01|103127|3|1|Offering this as in stock option to non ice version|Y
01|103135|3|1|Holds the 1 (1.00-.984)|Y
01|103165|1|1|C5006-1000A-6.50 CAT50 1in End Mill Holder Aerospace|Y
01|103165|1|2|Quoted at NET price.|Y
01|103166|1|1|Discount is based upon a purchase order of 5 or more|Y
01|103166|1|2|holders.|Y
01|103167|1|1|Ext Coolant 6500rpm 70Nm|Y
01|103169|1|1|This table to be configure with Fanuc Alpha 8 motor|Y
01|103169|1|2|Lyndex Nikken to work with Matsuura to confirm drive|Y
01|103169|1|3|and wiring connectors parameters.|Y
01|103169|1|4|table is stock delivery once we get wiring from builde|Y
01|103170|3|1|Installation includes: drive unit short bar fiber|Y
01|103170|3|2|optic cables communication cables bulk head cable|Y
01|103170|3|3|set external cable set parameter changes service|Y
01|103170|3|4|time and travel|Y
01|103170|5|1|LYNDEX NIKKEN TOOL CERTIFICATE FACE VALUE $1000.00|Y
01|103170|5|2|NO CHARGE|Y
01|103179|1|1|No Chip Hole Required.|Y
01|103183|1|1|Howa part# H037M15|Y
01|103184|1|1|TABLE HAS NO BRAKE AND CUSTOMER SUPPLIED MOTORS|Y
01|103184|1|2|CUSTOMER USING PANASONIC MOTORS|Y
01|103184|2|1|RUST PROOF TREATMENT AND STAINLESS STEEL HARDWARE|Y
01|103184|3|1|Scale Kit for External Heidenhain Encoders|Y
01|103184|3|2|Item is per Axis|Y
01|103184|4|1|Riser Blocks if using Scale on Rotary Axis|Y
01|103184|4|2|Table needs to be high column for clearance for scale|Y
01|103184|4|3|on backside of table.|Y
01|103184|6|1|TABLE HAS NO BRAKE AND CUSTOMER SUPPLIED MOTORS|Y
01|103184|6|2|CUSTOMER USING PANASONIC MOTORS|Y
01|103184|7|1|RUST PROOF TREATMENT WITH STAINLESS STEEL HARDWARE|Y
01|103184|8|1|Scale Kit with Heidenhain Rotary Scale|Y
01|103188|2|1|Alt for 50TG-SPAN|Y
01|103199|1|1|HSK50A-C25-95|Y
01|103199|1|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|103199|2|1|HSK50A-C32-110|Y
01|103199|2|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|103199|4|1|HSK50A-SK20C-120|Y
01|103199|4|2|Quoted as Net price Non-returnable Non-cancelable|Y
01|103199|5|1|HSK50A-SK10-90|Y
01|103199|5|2|Quoted as Net price Non-returnable Non-cancelable|Y
01|103199|5|3|AC collet is needed for collant thru|Y
01|103199|6|1|HSK50A-SK10-90-J|Y
01|103199|6|2|Quoted as Net pricing Non-returnable Non-cancelable|Y
01|103199|6|3|Coolant-Thru disk is needed for coolant thru|Y
01|103199|8|1|HSK50A-SK16-90|Y
01|103199|8|2|Quoted as Net pricing Non-returnable Non-cancelable|Y
01|103199|8|3|AC collet is needed for coolant thru|Y
01|103199|9|1|HSK50A-SK16-90-J|Y
01|103199|9|2|Quoted as Net pricing Non-returnable Non-cancelable|Y
01|103199|9|3|Coolant-Thru disk is needed for coolant thru|Y
01|103221|1|1|IC units: coolant must be on all times when running|Y
01|103232|1|1|External Cable Set|Y
01|103232|1|2|1 Cable for Power/Signal 1 Cable for Feedback|Y
01|103232|1|3|** Customer to confirm Serial # of Table **|Y
01|103233|10|1|In place of 11/64|Y
01|103238|1|1|Above knob is non-returnable and non-cancelable|Y
01|103240|3|1|BRS-12.5|Y
01|103240|4|1|BRS-14.2  MOQ: 1-2|Y
01|103240|5|1|BRS-3.3|Y
01|103240|6|1|BRS-4.3|Y
01|103240|7|1|BRS-5.05|Y
01|103240|8|1|BRS-5.2|Y
01|103240|10|1|BRS-6.8 MOQ: 1-2|Y
01|103240|11|1|BRS-7.1|Y
01|103240|12|1|BRS-8.4|Y
01|103240|13|1|BRS-9.7|Y
01|103240|14|1|BRS-8.5|Y
01|103251|3|1|AIR FITTING|Y
01|103261|1|1|*Set of 2 tables*|Y
01|103262|1|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|2|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|3|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|4|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|5|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|6|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|7|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|8|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|9|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|10|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|11|1|Installed with 3416.00000 collet nut|Y
01|103262|11|2|w/ Coolant Tube and Balluff Chip|Y
01|103262|12|1|Installed with 3420.00000 collet nut|Y
01|103262|12|2|w/ Coolant Tube and Balluff Chip|Y
01|103262|13|1|w/ Coolant Tube and Balluff Chip|Y
01|103262|14|1|w/ Coolant Tube and Balluff Chip|Y
01|103266|1|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|2|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|3|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|4|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|5|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|6|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|7|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|8|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|9|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|10|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|11|1|Installed with 3416.00000 collet nut|Y
01|103266|11|2|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|12|1|Installed with 3420.00000 collet nut|Y
01|103266|12|2|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|13|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103266|14|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|103280|1|1|Reference RGA# TAR-52576|Y
01|103280|1|2|TAT-250 s/n: 1220 Sent in for evaluation|Y
01|103285|1|1|This item is discontinued and no longer available|Y
01|103295|3|1|Includes Installation Drive Units Bulkhead Cables|Y
01|103295|3|2|External Cables Service Time & Travel|Y
01|103295|4|1|$1000.00 Complimentary Tooling Certificate for End User|Y
01|103295|4|2|with purchase of 5AX-201 Rotary Table.|Y
01|103306|1|1|Reference RGA# LVR-52653|Y
01|103306|1|2|Repair of MZQT47-ER32Z-MS-OFF s/n: 73987 02|Y
01|103306|1|3|(Mimatic# 183779)|Y
01|103306|2|1|Bearings seals and o-rings to be replaced.|Y
01|103317|3|1|AIR FITTING|Y
01|103326|1|1|Non standard stock itemonce ordered non cancelable or|Y
01|103326|1|2|returnable|Y
01|103326|2|1|Non standard stock item once ordered non cancelable|Y
01|103326|2|2|or returnable|Y
01|103330|5|1|20 3 JAW STEEL BODY CHUCK PACKAGE -- 7.48 THROUGH|Y
01|103330|5|2|20 3 JAW SET-TRU CHUCK 2 PC JAWS FINISHED ADAPTER|Y
01|103330|5|3|PLATE T-NUTS MOUNTING BOLTS & ASSEMBLY DRAWING.|Y
01|103330|5|4|**** ->-> THIS PRICE IS BUDGETERY AND SUBJECT TO CHANGE|Y
01|103330|5|5|I'LL GET UPDATED PRICING EARLY NEXT WEEK <-<- ****|Y
01|103331|1|1|Includes Haas Motors and Cables|Y
01|103331|2|1|Complimentary Tooling Certificate w/5AX Table Purchase|Y
01|103333|1|1|HA40M-ER25-ADJ:HAAS LIVE VDI40 ER25 ADJ 107deg;|Y
01|103333|1|2|Medium coupling?? (104.85mm or 117.55mm)|Y
01|103333|1|3|L=139mm;External coolant through pipe;|Y
01|103333|1|4|1:1 Gear ratio; 24Nm; 6500RPM;|Y
01|103333|1|5|Direction of rotation not reversal|Y
01|103333|2|1|HA40M-ER25-ADJ:HAAS LIVE VDI40 ER25 ADJ 107deg;|Y
01|103333|2|2|Medium coupling?? (104.85mm or 117.55mm)|Y
01|103333|2|3|L=139mm;External coolant through pipe;|Y
01|103333|2|4|1:1 Gear ratio; 24Nm; 6500RPM;|Y
01|103333|2|5|Direction of rotation not reversal|Y
01|103333|4|1|HA40M-ER25-ADJ-ICE:HAAS LIVE VDI40 ER25 ADJ 107deg;|Y
01|103333|4|2|Medium coupling?? (104.85mm or 117.55mm)|Y
01|103333|4|3|L=139mm;Int/ Ext coolant;1:1 Gear ratio; 24Nm; 6500RPM;|Y
01|103333|4|4|Direction of rotation not reversal|Y
01|103333|5|1|HA40M-ER25-ADJ-ICE:HAAS LIVE VDI40 ER25 ADJ 107deg;|Y
01|103333|5|2|Medium coupling?? (104.85mm or 117.55mm)|Y
01|103333|5|3|L=139mm;Int/ Ext coolant;1:1 Gear ratio; 24Nm; 6500RPM;|Y
01|103333|5|4|Direction of rotation not reversal|Y
01|103341|2|1|Substitute for 2inch(50.8mm)|Y
01|103376|2|1|NO WORKHOLDING OR FIXTURING QUOTE|Y
01|103376|6|1|EXTERNAL POWER/FEEDBACK CABLES|Y
01|103376|9|1|NO WORKHOLDING OR FIXTURING QUOTED|Y
01|103376|11|1|EXTERNAL/FEEDBACK CABLE SET|Y
01|103381|4|1|SKJ6-3.5C Coolant Disc|Y
01|103381|6|1|SKJ6-4.5C Coolant Disc|Y
01|103381|20|1|SKJ16-3.5C Coolant Disc|Y
01|103381|26|1|SKJ16-5/8C Coolant Disc|Y
01|103382|1|1|Reference RGA# TOR-52570|Y
01|103382|1|2|F90-C1.1/4AW-82 Front snap ring came off and|Y
01|103382|1|3|lost bearings.|Y
01|103382|5|1|Regreasing is included.|Y
01|103386|2|1|Installation includes: Dual axis drive unit short bar|Y
01|103386|2|2|fiber optic cables communications cables external|Y
01|103386|2|3|cables bulkhead cables parameter changes service|Y
01|103386|2|4|time and travel.|Y
01|103388|2|1|Installation includes: Drive unit short bar fiber|Y
01|103388|2|2|optic cables bulkhead cables external cables|Y
01|103388|2|3|parameter changes service time and travel.|Y
01|103388|4|1|Conversion includes: Motor gear wireharness cover|Y
01|103388|4|2|solenoid pressure switch and labour.|Y
01|103407|1|1|44.4 RPM; 135MM CENTER HEIGHT; 223 FT-LBS CLAMPING|Y
01|103407|2|1|CENTER HEIGHT 105MM; 30MM RISER REQUIRED|Y
01|103407|2|2|TAT-105 INCLUDES PNEUMATIC PORTS FOR BRAKE|Y
01|103407|3|1|EXTERNAL POWER/FEEDBACK CABLE FOR 4TH AXIS|Y
01|103407|4|1|INSTALLATION INCLUDES: FANUC 4TH AXIS DRIVE SERVO|Y
01|103407|4|2|MOTOR BULKHEAD CONNECTORS & WIRING TO CABINET|Y
01|103407|4|3|AND LYNDEX NIKKEN SERVICE TECHNICIAN TRAVEL EXPENSES|Y
01|103407|7|1|105MM CENTER HEIGHT; 30 MM RISER REQUIRED|Y
01|103425|4|1|USES SAME WRENCHES AS X: FK-8 & FK-9|Y
01|103430|1|1|Additional onetime discount added.|Y
01|103435|1|1|Reference RGA# LVR-52736|Y
01|103435|1|2|Repair of OKEX-ER32Z-MS s/n: AL0037|Y
01|103435|1|3|(Alps# OKA00-21001)|Y
01|103435|2|1|Gears spindle bearings O-rings Seals and Collet|Y
01|103435|2|2|Nuts to be replaced.|Y
01|103435|2|3|***We will try to clean up the original gears & spindle|Y
01|103435|2|4|and re-use; however we will not be able to tell if it|Y
01|103435|2|5|will be re-usable until assembled and test ran. If we|Y
01|103435|2|6|are able to re-use them the price will be $2236.11|Y
01|103440|1|1|*Qty Break Pricing: (1-3pc)|Y
01|103440|2|1|*Qty Break Pricing: (4-8pc)|Y
01|103440|3|1|*Qty Break Pricing: (9-12pc)|Y
01|103440|8|1|*Qty Break Pricing: (1-3pc)|Y
01|103440|9|1|*Qty Break Pricing: (4-8pc)|Y
01|103440|10|1|*Qty Break Pricing: (9-12pc)|Y
01|103440|16|1|Position block made by L&N.|Y
01|103440|16|2|Spindle drawing confirmation required.|Y
01|103440|16|3|Machine: Mazak HNC-8800|Y
01|103440|16|4|1x per machine required|Y
01|103473|3|1|Installation includes: Drive unit short bar fiber|Y
01|103473|3|2|optic cable communications cable bulkhead cables|Y
01|103473|3|3|external cables parameter changes service time and|Y
01|103473|3|4|travel.|Y
01|103484|1|1|Quoted as Net pricing Non-returnable Non-cancelable|Y
01|103499|1|1|HSK40E-C3/4 Milling Chuck High speed|Y
01|103499|1|2|Quote and Net Pricing No Returnable No Cancelable|Y
01|103499|1|3|Shortest gauge length possible under 69.85mm|Y
01|103499|1|4|Diameter under 1.7inch|Y
01|103512|1|1|Reference RGA# LVR-52714|Y
01|103512|1|2|Repair of T32106B11 s/n:A0051|Y
01|103512|1|3|(Alps# T32106 )|Y
01|103512|2|1|Bearings Seals O-rings Collet Nut Spindle|Y
01|103512|2|2|Spindle Cover to be replaced.|Y
01|103522|1|1|HSK63A-MDSK16-120|Y
01|103522|1|2|Quoted as net pricing non returnable non cancelable|Y
01|103525|1|1|SK50 Shell Mill 1.1/2 with ID ballif chip installed|Y
01|103525|1|2|spec DIN69871|Y
01|103526|6|1|NCS-11.0F|Y
01|103527|2|1|Installation includes: drive unit short bar fiber|Y
01|103527|2|2|optic cables communication cables bulk head cable|Y
01|103527|2|3|set external cable set parameter changes service|Y
01|103527|2|4|time and travel|Y
01|103531|1|1|66.6 RPM; 135MM CENTER HEIGHT; 663 FT-LBS CLAMPING|Y
01|103531|2|1|200MM FACEPLATE WITH T-SLOTS|Y
01|103531|3|1|CENTER HEIGHT 105MM; 30MM RISER REQUIRED|Y
01|103531|3|2|TAT-105 INCLUDES PNEUMATIC PORTS FOR BRAKING|Y
01|103531|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|103531|5|1|INSTALLATION INLCUDES: FANUC 4TH AXIS DRIVE SERVO|Y
01|103531|5|2|MOTOR BULKHEAD CONNECTORS & WIRING TO CABINET|Y
01|103531|5|3|AND LYNDEX NIKKEN SERVICE TECHNICIAN TRAVEL EXPENSES|Y
01|103531|8|1|105 MM CENTER HEIGHT; 30 MM RISER REQUIRED|Y
01|103534|1|1|HSK63A-MDSK16-120|Y
01|103534|1|2|ETA 11/26 WEEK|Y
01|103534|1|3|Quoted as net pricing non returnable non cancelable|Y
01|103540|4|1|Wrench for the CAT40-SK20-90U / CAT40-SK25-90U-IDU|Y
01|103540|5|1|Wrench for the CAT40-SK10-90U-IDU|Y
01|103578|1|1|Harding connectorshell plus air fittings - 2 per mach.|Y
01|103583|3|1|All collets but 1/8 and 7/16 remaining balance ETA|Y
01|103583|3|2|11/15|Y
01|103596|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|103596|4|1|INSTALLATION INCLUDES: FANUC 4TH AXIS MOTOR SERVO|Y
01|103596|4|2|AMPLIFIER BULKHEAD CONNECTORS & WIRING TO CABINET|Y
01|103596|4|3|AND LYNDEX NIKKEN SERVICE TECHNICIAN TRAVEL EXPENSES|Y
01|103613|5|1|COST IS NET TO DMG MORI|Y
01|103613|5|2|INCLUDES INSTALL TAVEL AND SERVO AMP|Y
01|103627|2|1|THESE TOOLS WERE USED AS LOANERS. I AM GIVING AN|Y
01|103627|2|2|ADDITIONAL 20% DISCOUNT ON THESE TOOLS. PASS THIS|Y
01|103627|2|3|EXTRA 20% ALONG TO NATHAN.|Y
01|103629|2|1|NEED TO CONFIRM AC/DC POWER INPUT|Y
01|103645|1|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|103666|1|1|HSK40E-HC0250 w/ std GL|Y
01|103666|2|1|HSK40E-HC0187 w/ std GL|Y
01|103673|1|1|Reference RGA# CUR-52689|Y
01|103673|1|2|Repair of C50RAM-ER32-200OTIC-80TPS s/n: 95421-01|Y
01|103673|1|3|(Mimatic# 192465)|Y
01|103673|2|1|Bearings seals and o-rings to be replaced.|Y
01|103682|1|1|Incluye la instalacion en su planta.|Y
01|103682|1|2|Se usaran los amplificcadores que actualmente tiene|Y
01|103682|1|3|la maquina Doosan.|Y
01|103682|1|4|Se usara la unidad hidraulica que actualmente tienen|Y
01|103700|1|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|103721|1|1|CAPTO C6 1 1/4 MILLING CHUCK|Y
01|103721|1|2|USES SAME KM COLLETS AS CURRENT MILLING CHUCKS|Y
01|103721|2|1|CAPTO C6 SK10 - COLLET RANGE 1/8 TO 3/8 INCH SIZES|Y
01|103721|2|2|2.0 MM TO 10 MM IN METRIC SIZES|Y
01|103721|3|1|CAPTO C6 SK16 - COLLET RANGE 1/8 TO 5/8 INCH SIZES|Y
01|103721|3|2|3.0 MM TO 16.0 MM METRIC SIZES|Y
01|103721|5|1|CAPTO C6 SK25 - COLLET RANGE 3/16 TO 3/4 INCH SIZES|Y
01|103721|5|2|AND 16.5 MM TO 25.4 MM METRIC SIZES|Y
01|103723|1|1|Repair of Brake System on CNCZ180LSA-BR2|Y
01|103723|1|2|Includes Labor + Brake Parts|Y
01|103723|1|3|Any additional part needed are in addition to the above|Y
01|103723|2|1|Repair of brake system on TAT-170 support table|Y
01|103723|2|2|Includes Labor and brake parts|Y
01|103723|2|3|Any additional part needed subject to change the above|Y
01|103723|4|1|Replacement Casting ONLY|Y
01|103723|4|2|Using customer's existing electrical components|Y
01|103723|4|3|If new complete table is desired - must contact Yamazen|Y
01|103726|1|1|Installed w/ PS-123-AIR|Y
01|103726|2|1|Installed on NC5-46-SK6C-75 at Factory|Y
01|103729|1|1|Quoted as Net price Non-returnable Non-cancelable|Y
01|103729|4|1|CAT40-SF4-6.00|Y
01|103729|4|2|Quoted as Net pricing Non-returnable Non-cancelable|Y
01|103729|4|3|Nose Dia. is 0.375|Y
01|103763|2|1|Worm Wheel|Y
01|103763|5|1|PLEASE NOTE: Need exact measure the diamete of the|Y
01|103763|5|2|existing needle bearing(1-2pcs).|Y
01|103776|2|1|This item is from our used stock and is purchased as is|Y
01|103776|2|2|Once an order is placed it may not be returned.|Y
01|103779|2|1|Note: Center heigths do not match subplate required.|Y
01|103783|1|1|PACKAGE PRICE INCLUDING BELOW 4TH AND 5TH AXIS|Y
01|103783|1|2|INSTALLATION|Y
01|103783|3|1|includes complete 4 + 1 installation|Y
01|103783|3|2|additional drives external internal cable included|Y
01|103783|3|3|all connectors and harware included. labor and travel|Y
01|103792|1|1|Please note: This R/Table is special. No cancellation|Y
01|103792|1|2|allawed. Tooling certification is not included.|Y
01|103792|4|1|R-Table Cables|Y
01|103793|6|1|n/a in 5 gl|Y
01|103793|11|1|n/a in 3.75 gl|Y
01|103793|15|1|n/a in 2.50 (combine qty for 2.50 & 2.37 need)|Y
01|103793|16|1|n/a in 5 gl|Y
01|103793|17|1|n/a in 1.75 gl|Y
01|103800|1|1|4 riser to increase tilt angle range 0-141 degrees.|Y
01|103800|7|1|4 riser to increase tilt angle to 0-141 degrees.|Y
01|103803|1|1|APPROVED FOR ONE TIME PURCHASE OF SHRINK FIT MACHINE|Y
01|103803|1|2|MUST HAVE SHRINK FIT MACHINE QUOTED FROM STEVEN BEFORE|Y
01|103803|1|3|PURCHASE|Y
01|103820|2|1|$1000.00 Complimentary Tooling Certificate for Sumitomo|Y
01|103820|2|2|with the purchase of a 5AX-201FA-M-AB.|Y
01|103820|3|1|Installation Includes: Drive amp bulkhead cable set|Y
01|103820|3|2|external cable set communication cable fiber optic|Y
01|103820|3|3|cable parameter changes travel & labor for|Y
01|103820|3|4|installation of one 5AX table on a Makino PS105|Y
01|103836|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|103836|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|103836|3|1|SK40 SK20 Slim Chuck|Y
01|103836|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|103836|3|3|3 PCS ETA 2 WKS 2 PCS ETA 17-18 WKS|Y
01|103843|2|1|Complimentary Tooling Certificate w/5AX Table Purchase|Y
01|103847|2|1|10 L n/awe offer an 8 Length|Y
01|103847|7|1|10 L n/a we offer a 7 length|Y
01|103862|1|1|Standard motor is A06B-0205-B000|Y
01|103863|7|1|We do not offer Taper Plus in this size.|Y
01|103863|9|1|We do not offer Taper Plus in this size.|Y
01|103863|12|1|We do not offer Taper Plus in this size.|Y
01|103879|1|1|Price 1-2pcs|Y
01|103879|2|1|2pc STOCK in IL|Y
01|103879|2|2|3rd pc - 12weeks from rcpt PO|Y
01|103879|2|3|4th pc - 22weeks from rcpt PO|Y
01|103879|2|4|**Price based on 3-4pcs ordered at same time|Y
01|103881|2|1|Customer needs Mazak version|Y
01|103888|2|1|*1st set free|Y
01|103888|3|1|*1st set free|Y
01|103896|1|1|HSK50A-SM0750-1.75 Shell Mill Holder 3/4 X 1.75 Gage|Y
01|103896|1|2|Length.|Y
01|103897|1|1|HSK50A-C25-95|Y
01|103897|1|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|103897|2|1|HSK50A-C32-110|Y
01|103897|2|2|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|103897|4|1|HSK50A-SK20C-120|Y
01|103897|4|2|Quoted as NET pricing Non-returnable Non cancelable|Y
01|103897|5|1|HSK50A-SK10-90|Y
01|103897|5|2|Quoted as Net price Non-returnable Non-cancelable|Y
01|103897|5|3|AC collet is needed for coolant thru|Y
01|103897|8|1|HSK50A-SK16-90|Y
01|103897|8|2|Quoted as Net pricing Non-returnable Non-cancelable|Y
01|103897|8|3|AC collet is needed for coolant thru|Y
01|103897|10|1|Quoted as Net pricing|Y
01|103897|11|1|Quoted as Net pricing|Y
01|103909|1|1|Pricing reflective of November Sale|Y
01|103927|1|1|replacement nut for NKA01-42000|Y
01|103942|1|1|HSK40E-C16-80G Nikken part #|Y
01|103942|1|2|Item is non stock standard non cancelable or returnable|Y
01|103942|1|3|once ordered|Y
01|103975|1|1|No repair kit available for this unit|Y
01|103979|1|1|Reference RGA# TAR-52642|Y
01|103979|1|2|5AX-120WA s/n: 425|Y
01|103979|1|3|Table making a grinding noice and getting 2104 alarm|Y
01|103979|1|4|on control.|Y
01|103984|1|1|Reference RGA# TAR-52712|Y
01|103984|1|2|TAT-105N s/n: 1885-B|N
01|103985|2|1|Offered as alternative to the 3.13|Y
01|103985|5|1|Offered as an alternative to the 2.50|Y
01|103997|1|1|NS301R012: Eccentric Housing #12|Y
01|103997|2|1|NS302R013: Holder for bearing #13|Y
01|103997|3|1|1pc Stock 1pc delivery pending.|Y
01|103997|3|2|#14|Y
01|103997|4|1|NS302R015: Coller #15|Y
01|103997|5|1|NH301R016: Case for oil seal #16|Y
01|103997|6|1|#24a|Y
01|103997|6|2|1pc Stock 1pc delivery pending.|Y
01|103997|7|1|#25|Y
01|103997|8|1|#26|Y
01|103997|9|1|#27|Y
01|103997|10|1|1pc Stock 1pc delivery pending.|Y
01|103997|10|2|#28|Y
01|103997|11|1|#29|Y
01|103997|12|1|#16a|Y
01|103997|13|1|#27a|Y
01|103997|14|1|#28a|Y
01|103997|15|1|#G|Y
01|103997|16|1|#H|Y
01|103998|1|1|Reference RGA# 52712|Y
01|103998|1|2|TAT-105N s/n:4325|N
01|104012|1|1|This item is being discontinued.|Y
01|104012|1|2|The following item is an alternative|Y
01|104016|1|1|Replacement Parts for 5AX-130 Full Rebuild|Y
01|104018|4|1|In stock version can be used as long as coolant is not|Y
01|104018|4|2|running through the cutting tool (center through)|Y
01|104018|4|3|This item has coolant ports in the face|Y
01|104021|2|1|Blank disc modification .376 without O-ring|Y
01|104021|2|2|This item is non-returnable.|Y
01|104032|1|1|KM3/4-15  KM3/4 Straight Collet/Sleeve 15mm|Y
01|104032|1|2|Order minimum 5 pieces required.|Y
01|104033|1|1|*comes w/ 2x same taper pots at n/c|Y
01|104047|2|1|PRICE MATCHES - NC4017-0016-6.00 @ $369.00 EACH|Y
01|104047|3|1|PRICE MATCHES - NC4017-0032-5.00 @ $369.00 EACH|Y
01|104047|4|1|PRICE MATCHES - HSK63A-ER16-5.00 @ $359.25 EACH|Y
01|104047|5|1|PRICE MATCHES - HSK63A-ER16-5.00 @ $359.25 EACH|Y
01|104047|6|1|PRICE MATCHES - HSK63A-ER32-4.00 @ $350.25 EACH|Y
01|104047|7|1|PRICE MATCHES - HSK63A-ER40-6.00 @ $382.00|Y
01|104060|1|1|1 PC ETA 2 WKS Balance ETA 1/2/19|Y
01|104073|8|1|** 1/8 NPT style|Y
01|104073|9|1|** 1/4 NPT style|Y
01|104080|1|1|Reference RGA# TAR-52800|Y
01|104080|1|2|CNCZ180LSA-BR2 s/n: 20250T|Y
01|104080|1|3|Brake system not working properly.|Y
01|104081|1|1|Delivery pending.ETA within approx 1 week|Y
01|104089|2|1|Includes drive unit interface cabling travel labor|Y
01|104089|2|2|expenses|Y
01|104098|1|1|Reference RGA# TAR-52710|Y
01|104098|1|2|TAT-400 s/n: 1153|N
01|104110|4|1|PRESETTER Model No. HATHOR SIX A  #40|Y
01|104111|1|1|RGA# TAR-52709|Y
01|104111|1|2|NXVX400 s/n: 1062 Unit has hydraulic leak|Y
01|104111|37|1|Rotary joint shaft to be chromed and re-ground.|Y
01|104111|37|2|Rotary joint has grooves.|Y
01|104112|1|1|NBT40-NR2351-188  Spindle Speeder|Y
01|104115|1|1|Non standard stock item is non cancelable and|Y
01|104115|1|2|non returnable after oreder is placed|Y
01|104125|1|1|Non std stock item is non cancelable nor returnable|Y
01|104125|1|2|once the order is placed|Y
01|104126|1|1|On quote file for P&D|Y
01|104143|1|1|BT50-STBT30025 (You Ji Model code)|Y
01|104143|1|2|Quoted as net pricing non-returnable non-cancelable|Y
01|104145|1|1|Reference RGA# TAR-52816|Y
01|104145|1|2|CNC170LA21 s/n: 8785|Y
01|104149|1|1|Quoted as net pricing|Y
01|104149|2|1|Quoted as net pricing|Y
01|104149|3|1|Quoted as net pricing|Y
01|104149|4|1|Quoted as net pricing|Y
01|104149|5|1|Quoted as net pricing|Y
01|104149|6|1|Quoted as net pricing|Y
01|104149|7|1|Quoted as net pricing|Y
01|104149|8|1|ID 3mm Quoted as alternative for 1/8(3.175mm)|Y
01|104149|8|2|Quoted as net pricing|Y
01|104149|9|1|ID7.9mm quoted as altenative for 5/16(7.94mm)|Y
01|104149|9|2|Quoted as net pricing|Y
01|104149|10|1|Quoted as net pricing|Y
01|104149|11|1|Quoted as net pricing|Y
01|104149|12|1|Quoted as net pricing|Y
01|104149|13|1|Quoted as net pricing|Y
01|104149|14|1|Quoted as net pricing|Y
01|104149|15|1|Quoted as net pricing|Y
01|104149|16|1|ZKG16-NO.12U|Y
01|104149|16|2|Quoted as net pricing non-returning non-cancelable|Y
01|104149|17|1|Quoted as net pricing|Y
01|104149|18|1|Quoted as net pricing|Y
01|104161|9|1|MACHINE MUST HAVE 4TH AXIS INSTALLED BY HAAS AND ALSO|Y
01|104161|9|2|THIRD PARTY OPTION INSTALLED BY HAAS|Y
01|104180|1|1|Reference RGA# TOR-52671|Y
01|104180|1|2|S20-UMT Sending in for evaluation. No additional|Y
01|104180|1|3|information was given to them by end user.|Y
01|104180|2|1|Re-calibration service is included.|Y
01|104193|1|1|Reference RGA# TOR-52749|Y
01|104193|1|2|CAT40-UMT200U No additional information given.|Y
01|104206|1|1|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|104211|2|1|Worm Wheel|Y
01|104211|5|1|PLEASE NOTE: Need exact measure the diamete of the|Y
01|104211|5|2|existing needle bearing(1-2pcs).|Y
01|104212|3|1|delivery 1 week from machine/model confirmation|Y
01|104212|3|2|Lyndex-Nikken made block|Y
01|104212|3|3|*net price|Y
01|104216|1|1|Reference RGA# TAR-52634|Y
01|104216|1|2|5AX-2002FA s/n: 2250 Table does not rotate at true 90.|Y
01|104224|3|1|KENNAMETAL - 3870020|Y
01|104224|5|1|KENNAMETAL - 3870024|Y
01|104224|7|1|KENNAMETAL - 3870026|Y
01|104224|10|1|STANDARD CAT40 MILLING CHUCK|Y
01|104224|10|2|KENNAMETAL - 3100356|Y
01|104224|11|1|KENNAMETAL - 3101077|Y
01|104224|18|1|1/4 SLIM LINE HYDRAULIC CHUCK|Y
01|104228|1|1|External Coolant|Y
01|104228|2|1|Internal Coolant External Coolant & can be run dry|Y
01|104228|5|1|External Coolant|Y
01|104228|6|2|Main & Sub Spindle - External Coolant|Y
01|104244|1|1|P/N: N4006-0750-4.75 NMTB40 3/4 End Mill Holder|Y
01|104244|1|2|Minimum 5pcs. Quoted as NET price. This item is not|Y
01|104244|1|3|standard stock and considered special.|Y
01|104244|1|4|non-returnable non-cancellable|Y
01|104260|1|1|Reference RGA# TAR-52706|Y
01|104260|1|2|5AX-130YA s/n: 4785|Y
01|104262|1|1|Table + Amp + B-axis cable no sheet metal/junction box|Y
01|104277|1|1|Taper Cleaner set for BT30 US Spec 110-120V|Y
01|104277|1|2|Quoted as net pricing non-returnable non-cancelable|Y
01|104298|1|1|Reference RGA# LVR-52788|Y
01|104298|1|2|Repair of OKE4-ER40X s/n: AL010|Y
01|104298|1|3|(Alps# OKA01-13000)|Y
01|104298|2|1|Spindle spindle cover collet nut bearigns o-rings|Y
01|104298|2|2|and seals to be replaced.|Y
01|104299|1|1|Lyndex-Nikken Angle Head Quill Clamp Collar +|Y
01|104299|1|2|Positioning Block Assembly for Trak DPM RX7|Y
01|104304|2|1|*Upgrade 4-axis card to 6-axis card*|Y
01|104313|1|1|Duplicate replacement for Ser# 20250T|Y
01|104313|2|1|TAT-105 units to arrive Nov 26 2018|Y
01|104316|3|1|YOU NEED ONE OF THESE FOR EACH MACHINE THE TABLE|Y
01|104316|3|2|IS INSALLED ON.|Y
01|104316|4|1|YOU NEED ONE OF THESE FOR EACH MACHINE THE TABLE|Y
01|104316|4|2|IS INSTALLED ON|Y
01|104316|5|1|FIRST INSTALL|Y
01|104316|5|2|INCLUDES SERVO AMP|Y
01|104316|6|1|EACH ADDITIONAL MACHINE INSTALL|Y
01|104316|6|2|INCLUDES SERVO AMP|Y
01|104321|1|1|BT30 Testbar per RFQ#000120006/TAM221120|Y
01|104322|1|1|D.T3-16ANG   Non Stop Drill Tap Set.|Y
01|104331|8|1|**Customer must machine to desired size|Y
01|104346|1|1|BT30-SK10-90P BT30 SK10 Slim Chuck High Speed Max|Y
01|104346|1|2|30000 RPM >>No Drive Dog Slots (Keyway)|Y
01|104346|1|3|Quoted at NET price.|Y
01|104359|1|1|Reference RGA# TOR-52631|Y
01|104359|1|2|Tool #1: HP-6 5600281705|Y
01|104359|6|1|Tool #2: HP-6 5600330446|Y
01|104359|10|1|Tool #3: HP-6 560344050|Y
01|104360|1|1|Reference RGA# TAR-52753|Y
01|104360|1|2|5AX-350FA-RCN2-RJ6 s/n: 3959 Table sent in for|Y
01|104360|1|3|evaluation.|Y
01|104368|1|1|Brandon is asking for 30-100 qty.|Y
01|104370|1|1|Replacement for CNCZ180LSA-BR2-QT/R650 due to delivery|Y
01|104370|1|2|delays. Being sold at same price as a special one time|Y
01|104370|1|3|pricing|Y
01|104379|1|1|Reference RGA# TAR-52826|Y
01|104379|1|2|TAT-200 s/n:1429|N
01|104386|2|1|Quoted at NET price.|Y
01|104395|1|1|All Collets in stock except 17/32|Y
01|104398|12|1|wrench for C5007-0032 and C5017-0032|Y
01|104402|6|1|Nut wrench for MI63-ER32|Y
01|104402|7|1|Spindle Wrench for MI63-ER32 & ER40|Y
01|104402|8|1|Nut wrench for MI63-ER40|Y
01|104406|7|1|Price includes PS-N46E|Y
01|104413|1|1|Reference RGA# TAR-52620|Y
01|104413|1|2|5AX-350FA-RCN2-RJ6 s/n: 3870 Table was crashed.|Y
01|104413|33|1|Scale cable|Y
01|104413|35|1|Modification charge to re-paint unit.|Y
01|104448|3|1|2x per Tailstock|Y
01|104448|3|2|Installed at L&N|Y
01|104448|3|3|(Without MT3 LIVE Center)|Y
01|104456|1|1|Pricing reflects year end sales value|Y
01|104479|1|1|BMT65-ER11(X)-UT-SP|Y
01|104479|1|2|BMT65; ER11; X-axis; U-tool; L=81mm; L1=101mm;|Y
01|104479|1|3|External Coolant; 1:2 Gear ratio; Max torque M=10Nm;|Y
01|104479|1|4|n1=3750 RPM n2=7500 RPM; Reversed Direction of Rotate|Y
01|104479|2|1|BMT65-ER11(X)-UT-SP|Y
01|104479|2|2|SAME TOOL AND DESCRIPTION AS ABOVE DISCOUNTED FOR|Y
01|104479|2|3|ADDITIONAL QUANTITY|Y
01|104479|3|1|BMT65-ER11(X)-UT-SP|Y
01|104479|3|2|SAME TOOL AND DESCTIPTION AS ABOVE DISCOUNTED FOR|Y
01|104479|3|3|ADDITIONAL QUANTITY.|Y
01|104486|1|1|BMT65-ER11(X)-UT-SP|Y
01|104486|1|2|BMT65; ER11; X-axis; U-tool; L=81mm; L1=101mm;|Y
01|104486|1|3|External Coolant; 1:2 Gear ratio; Max torque M=10Nm;|Y
01|104486|1|4|n1=3750 RPM n2=7500 RPM; Reversed Direction of Rotate|Y
01|104486|2|1|BMT65-ER11(X)-UT-SP|Y
01|104486|2|2|SAME TOOL AND DESCRIPTION AS ABOVE DISCOUNTED FOR|Y
01|104486|2|3|ADDITIONAL QUANTITY|Y
01|104486|3|1|BMT65-ER11(X)-UT-SP|Y
01|104486|3|2|SAME TOOL AND DESCTIPTION AS ABOVE DISCOUNTED FOR|Y
01|104486|3|3|ADDITIONAL QUANTITY.|Y
01|104497|4|1|This item is non-returnable non-cancelable|Y
01|104498|1|1|Table only no amp no sheet metal no junction box|Y
01|104498|2|1|Table only no amp no sheet metal no junction box|Y
01|104498|3|1|No amp table + cable only|Y
01|104516|1|1|Checking delivery contact Steve Lenihan to get the|Y
01|104516|1|2|discount|Y
01|104516|3|1|Scale + Scale mount kit for rotary and tilt axis|Y
01|104516|3|2|Would require risers for the rotary table which are|Y
01|104516|3|3|included in the price|Y
01|104532|1|1|Net price is based upon an order of 5-pcs.|Y
01|104538|2|1|Installation includes: Drive unit short bar fiber|Y
01|104538|2|2|optic cable communications cable bulkhead cables|Y
01|104538|2|3|external cables parameter changes service time and|Y
01|104538|2|4|travel.|Y
01|104540|1|1|Reference RGA# TAR-52786|Y
01|104540|1|2|CNC601FA s/n:6019|N
01|104548|1|1|Price at 2pcs|Y
01|104548|3|1|Price at 4pcs**|Y
01|104548|3|3|Mazak live ER40; adjustable Y-axis with 6 fixed posit|Y
01|104548|3|4|Center offset A=70mm;L=145mm;|Y
01|104548|3|5|1:1 Gear ratio; max torque 50Nm; 5400RPM;|Y
01|104548|3|6|Reversal of rotation|Y
01|104548|3|7|Ext coolant|Y
01|104548|3|8|Ref drwg# 00002325|Y
01|104549|3|1|Kit includes: Drive external cables internal cables|Y
01|104549|3|2|fiber optic cables short bar and Fanuc|Y
01|104549|3|3|battery.|Y
01|104549|3|4|*** Equipment data sheets must be submitted to L-N|Y
01|104549|3|5|before the release of product.|Y
01|104554|5|1|*Include quick disconnect swivel fittings and manifold|Y
01|104554|13|1|*Include quick disconnect swivel fittings and manifold|Y
01|104563|4|1|*slow moving stock|Y
01|104564|1|1|*Price includes installed coolant tube and Balluff|Y
01|104564|1|2|chip|Y
01|104564|1|3|**net price|Y
01|104566|1|1|Reference RGA# TAR-52733|Y
01|104566|1|2|5AX-2002FA s/n: 1558|N
01|104573|1|1|Quoted as net pricing non-returnable non-cancelable|Y
01|104573|1|2|Price includes PS-N100VE pull stud|Y
01|104573|2|1|Quoted as net pricing non-returnable non-cancelable|Y
01|104573|2|2|Price includes PS-N100VE pull stud|Y
01|104595|1|1|Discount reflects purchase of 1 live tool.|Y
01|104595|2|1|Discount reflects purchase of 2 live tools.|Y
01|104595|4|1|Discount reflects purchase of 1 live tool.|Y
01|104595|5|1|Discount reflects purchase of 2 live tools.|Y
01|104595|10|1|Discount reflects purchase of 1 live tool|Y
01|104595|11|1|Discount reflects purchase of 2 live tools.|Y
01|104601|1|1|Stock in Japan Non-returnable Non-cancelable|Y
01|104607|1|1|Reference RGA# QUA-52811|Y
01|104607|1|2|CAT40U-NX5-153 Making loud noise.|Y
01|104607|5|1|Labor is covered under warranty.|Y
01|104632|3|1|Quoted as net pricing non-returnable non-cancelable|Y
01|104632|4|1|Quoted as net pricing non-returnable non-cancelable|Y
01|104632|6|1|CAT40-C1.1/4F-105U DIN Coolant thru|Y
01|104632|6|2|Quoted as net pricing non-returnable non-cancelable|Y
01|104638|8|1|1 Free Pull Stud for every 1 toolholder!|Y
01|104645|2|1|Cable Set|Y
01|104649|5|1|*Include quick disconnect swivel fittings and manifold|Y
01|104659|1|1|6475-2129-101018|Y
01|104659|6|1|4 PCS ETA 2 WKS 1 PC ETA PENDING|Y
01|104659|7|1|3 PCS ETA 2 WKS 4 PCS ETA 3/15/19|Y
01|104659|8|1|ETA 2 WKS|Y
01|104659|9|1|4 PCS STK BALANCE ETA 2 WKS|Y
01|104659|10|1|ETA 2 WKS|Y
01|104659|27|1|ETA 2 WKS|Y
01|104659|43|1|ETA 1 WK|Y
01|104662|1|1|Reference RGA# TOR-52728|Y
01|104662|1|2|HP-100 Needle is not returning to zero.|Y
01|104662|4|1|Calibration service included.|Y
01|104677|22|1|Wrenchs offered special package|Y
01|104678|1|1|SHRINK FIT UNIT INCLUDES: SHRINK FIT MAIN UNIT COOLING|Y
01|104678|1|2|COOLING UNIT 5 PIECE INDUCTION RING SET CHUCK|Y
01|104678|1|3|HOLDERS  5 PIECE COOLING BRACKET SET TWO 40|Y
01|104678|1|4|TAPER TOOL POTS.|Y
01|104680|1|1|REF: Parlec C40-75EM1|Y
01|104680|2|1|REF: Parlec C40-25EM1|Y
01|104680|3|1|REF: Techniks CAT40xSLN 1/2-3:|Y
01|104680|4|1|REF: Techniks CAT40xSLN1/2-1.75|Y
01|104680|5|1|REF: CAT40-ER16H-0400 PIONEER|Y
01|104680|6|1|REF: Pioneer CAT40-ER32-0400|Y
01|104680|7|1|REF: Pioneer CAT40-EM012-0175|Y
01|104680|8|1|REF: Fitz-Rite 40C-ER20-4|Y
01|104680|9|1|REF: Rego-Fix CAT40/ER40x3 1/2 H|Y
01|104683|3|1|BMT55-ER25-MDY Dual straight along Y-axis 1:1 Gear rati|Y
01|104683|3|2|Spindle Pitch A=70mm; L=97mm max torque 20Nm per spndle|Y
01|104683|3|3|6500 RPM External coolant REF DWG# 00054858|Y
01|104683|4|1|BMT55-ER25(Z)-MDY Dual 90deg along Y-axis 1:1 gear rati|Y
01|104683|4|2|Spindle pitch A=70mm; L1=85mm  6500RPM|Y
01|104683|4|3|max torque 30Nm on 1 working spindle|Y
01|104683|4|4|Reference Drawing #00054878|Y
01|104684|1|1|Reference RGA# TOR-52546|Y
01|104684|1|2|2 x CAT40-SZF25-120U Cam screw is cracked.|Y
01|104686|3|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|104686|5|1|Installation includes:|Y
01|104686|5|2|iptic cables communication cables|Y
01|104686|5|3|parameter changes service|Y
01|104686|5|4|time and travel|Y
01|104710|1|1|Pricing reflects onetime discount|Y
01|104711|5|1|Custom Positioning Block based on Customer provided|Y
01|104711|5|2|machine specs.|Y
01|104714|1|1|21378-2111-092518|Y
01|104760|1|1|Reference RGA# TOR-52696|Y
01|104760|1|2|2 x BT40-NPU8-70|Y
01|104760|1|3|Sending in for evaluation/repair|Y
01|104773|1|1|30-pcs ship by 11-30/ Bal 3~4 Weeks|Y
01|104773|2|1|8 Stock L-N/ 10-pcs 1~2 Weeks/Bal 15~16 Weeks|Y
01|104773|3|1|13-pcs ship on 11-30/Bal 15~16 Weeks|Y
01|104783|3|1|Cable Sets|Y
01|104797|1|1|Quoted at Net Price|Y
01|104797|2|1|Quoted at Net Price|Y
01|104800|1|1|INCLUDES SERVO MOTOR|Y
01|104800|1|2|4TH AND 5TH AXIS INTERFACE NEEDED NOT INCLUDED|Y
01|104800|3|1|EXTERNAL CABLES SET FOR 2 AXIS|Y
01|104800|5|1|SERVO MOTOR INCLUDED|Y
01|104800|5|2|4TH AXIS INTERFACE NEEDED NOT INCLUDED|Y
01|104800|7|1|EXTERNAL CABLE SET FOR 1 AXIS|Y
01|104802|1|1|Reference RGA# TAR-52458|Y
01|104802|1|2|5AX-2002FA s/n: 2500|Y
01|104812|1|1|Quoted as NET pricing Non-returnablenon-cancelable|Y
01|104812|2|1|Quoted as NET pricing Non-returnablenon-cancelable|Y
01|104812|3|1|Quoted as NET pricing Non-returnablenon-cancelable|Y
01|104812|4|1|Quoted as NET pricing Non-returnablenon-cancelable|Y
01|104812|5|1|Quoted as NET pricing Non-returnablenon-cancelable|Y
01|104812|6|1|Quoted as NET pricing Non-returnablenon-cancelable|Y
01|104824|1|1|1 PC ETA 1 WK 1 PC ETA 16 WKS|Y
01|104824|2|1|ETA 16 WKS|Y
01|104824|3|1|ETA 22 WKS|Y
01|104824|4|1|This item is non-returnable non-cancelable|Y
01|104828|1|1|JKA7H50X40-D3-RK|Y
01|104828|1|2|HOWA Hydraulic Clamp Cylinder|Y
01|104828|1|3|Quoted as net pricing non-returnable non-cancelable|Y
01|104828|2|1|JKA7H50X40-D4-RK|Y
01|104828|2|2|HOWA Hydraulic Clamp Cylinder|Y
01|104828|2|3|Quoted as net pricing non-returnable non-cancelable|Y
01|104835|1|1|Quoted as net pricing non-returnable non-cancelable|Y
01|104835|3|1|same wrenches as above|Y
01|104836|4|1|Includes short bar fiber optic cable and communication|Y
01|104836|4|2|cable.|Y
01|104838|2|1|Includes drive unit interface cabling travel labor|Y
01|104838|2|2|expenses|Y
01|104839|1|1|Reference RGA# CUR-52689|Y
01|104839|1|2|Repair of C50RAM-ER32-200OTIC-80TPS s/n: 95421-01|Y
01|104839|1|3|(Mimatic# 192465)|Y
01|104839|2|1|Bearings seals and o-rings to be replaced.|Y
01|104848|1|1|Reference RGA# TOR-52750|Y
01|104848|1|2|CAT40-UMT200 Sending in for repair.|Y
01|104852|14|1|INCLUDED AT NO COST|Y
01|104852|14|2|`|N
01|104854|1|1|Reference RGA# TAR-52706|Y
01|104854|1|2|5AX-130YA s/n: 4785|Y
01|104859|16|1|Quoted as net pricing non-returnable non-cancelable|Y
01|104874|1|1|Pricing reflects Nov Sale one time only|Y
01|104878|1|1|Reference RGA# TOR-52843|Y
01|104878|1|2|Repair of PF-2|Y
01|104878|2|1|LR1-N 1.5V Batteries|Y
01|104878|3|1|Calibration service is included.|Y
01|104884|1|1|Reference RGA# LVR-52747|Y
01|104884|1|2|Repair of MZQT47-ER16-AD-HS s/n: 29194 01|Y
01|104884|1|3|(Mimatic# 125054)|Y
01|104884|2|1|Bearings seals and o-rings to be replaced.|Y
01|104884|2|2|Labor is included.|Y
01|104885|15|1|INCLUDED AT NO COST|Y
01|104885|15|2|`|N
01|104890|1|1|Warranty repair of 5AX-120WA s/n: 425|Y
01|104890|1|2|Reference RGA# TAR-52642|Y
01|104918|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS TABLE|Y
01|104937|1|1|Reference RGA# LVR-52827|Y
01|104937|1|2|Repair of Mazak Live Tool s/n: N/A|Y
01|104937|2|1|Bearings seals and o-rings to be replaced.|Y
01|104965|11|1|*external Coolant|Y
01|104969|1|1|Item ATD19-5/8U quoted at NET price|Y
01|104969|1|2|Item is non standard stock special.It is non-cancelable|Y
01|104969|1|3|or returnable once order is placed|Y
01|104985|5|1|Replaces CN103R007|Y
01|104993|2|1|Delivery is about 1 wk from receipt of spindle drawing|Y
01|104993|2|2|information.|Y
01|104993|2|3|Lyndex-Nikken to make the position block.|Y
01|104993|2|4|quoted at net price|Y
01|105013|3|1|Cable Set|Y
01|105019|1|1|Reference RGA# LVR-52828|Y
01|105019|1|2|Repair of OKL3-ER32Z s/n: AL390|Y
01|105019|1|3|(Alps# OK101-13000)|Y
01|105019|2|1|Bearings o-rings seals collet nut and lock washer|Y
01|105019|2|2|to be replaced.|Y
01|105022|3|1|Installation inlcudes: Drive unit short bar fiber|Y
01|105022|3|2|optic cable communications cable bulkhead cables|Y
01|105022|3|3|external cables parameter changes service time and|Y
01|105022|3|4|travel.|Y
01|105029|1|1|Reference RGA# CUR-52836|Y
01|105029|1|2|CAT50U-AHC1.1/4-210-90 s/n: AHG-08213|Y
01|105029|1|3|Spindle has too much play.|Y
01|105056|3|1|Customer will choose 1 or the other option for the|Y
01|105056|3|2|positioning block.Questionnaire sent with quote|Y
01|105056|3|3|Questionnaire needs to be returned to confirm items|Y
01|105056|3|4|prior to ordering|Y
01|105059|3|1|Price is based upon a purchase of 10 CAT40 holders.|Y
01|105068|2|1|KM20-6A  Anniversary|Y
01|105068|4|1|KM20-8A  Anniversary|Y
01|105068|6|1|KM20-10Q  non-anniversary|Y
01|105068|8|1|KM20-12Q  Non-Anniversary|Y
01|105068|10|1|KM20-14Q  non-anniversary|Y
01|105068|15|1|non-Anniversary|Y
01|105068|17|1|KM20-5/16A  Anniversary|Y
01|105068|19|1|KM20-7/16A  Anniversary|Y
01|105068|21|1|KM20-9/16A  Anniversary|Y
01|105068|31|1|KM32-11/16Q  Non Anniversary|Y
01|105068|31|2|NO QUOTE|Y
01|105068|33|1|KM32-3/4Q Non-Anniversary|Y
01|105071|1|1|quote is based on (STD pitch=60)|Y
01|105071|8|1|NET Price Quoted.|Y
01|105075|1|1|This item is considered non-standard stock and will|Y
01|105075|1|2|be non-returnable and non-cancellable once a|Y
01|105075|1|3|purchase order has been issued.|Y
01|105075|1|4|Item is at NET price|Y
01|105076|2|1|1 wrench for spindle/ 1 wrench for nut|Y
01|105077|1|1|20MM CAT40 HYDRAULIC CHUCK 118MM GL|Y
01|105077|2|1|20MM Taper Plus CAT40 Hydraulic Chuck 118MM GL|Y
01|105077|3|1|20MM CAT40 HYDRAULIC CHUCK 70MM GL|Y
01|105077|4|1|20MM CAT40 TAPER PLUS 70MM GL|Y
01|105077|5|1|20MM CAT40 HYDRAULIC CHUCK 152 MM GL|Y
01|105077|6|1|20MM CAT40 TAPER PLUS HYDRAULIC CHUCK 152 MM GL|Y
01|105077|7|1|32MM CAT40 FACE MILL 100MM GL|Y
01|105077|8|1|32 MM CAT40 TAPER PLUS END MILL 100MM GL|Y
01|105077|9|1|CAT40 3/32 END MILL 2-3/4 GL|Y
01|105077|10|1|CAT40 TAPER PLUS 3/32 END MILL 2-3/4 GL|Y
01|105077|11|1|CAT40 5/32 END MILL 2-3/4 GL|Y
01|105077|12|1|CAT40 TAPER PLUS 5/32 END MILL 2-3/4 GL|Y
01|105077|14|1|CAT40 TAPER PLUS 3/16 END MILL 2-3/4 GL|Y
01|105077|15|1|CAT40 3/16 END MILL 6.00 GL|Y
01|105077|16|1|CAT40 TAPER PLUS 3/16 END MILL 6.00GL|Y
01|105077|18|1|CAT40 TAPER PLUS 1/4 END MILL 2-3/4 GL|Y
01|105077|19|1|CAT40 1/4 END MILL 6.00GL|Y
01|105077|20|1|CAT40 TAPER PLUS 1/4 END MILL 6.00GL|Y
01|105077|22|1|CAT40 TAPER PLUS 5/16 END MILL 2-3/4GL|Y
01|105077|24|1|CAT40 TAPER PLUS 3/8 END MILL 2-3/4GL|Y
01|105077|25|1|CAT40 3/8 END MILL 6.00GL|Y
01|105077|26|1|CAT40 TAPER PLUS 3/8 END MILL 6.00 GL|Y
01|105077|31|1|CAT40 4MM END MILL 70MM GL|Y
01|105077|32|1|CAT40 TAPER PLUS 4MM END MILL 70MM GL|Y
01|105077|34|1|CAT40 TAPER PLUS 6MM END MILL 70MM GL|Y
01|105077|35|1|CAT40 8MM END MILL 152MM GL|Y
01|105077|36|1|CAT40 TAPER PLUS 8MM END MILL 152MM GL|Y
01|105077|38|1|CAT40 TAPER PLUS 10MM END MILL 70MM GL|Y
01|105077|39|1|CAT40 10MM END MILL 152MM GL|Y
01|105077|40|1|CAT40 TAPER PLUS 10MM END MILL 152MM GL|Y
01|105077|42|1|CAT40 TAPER PLUS 12MM END MILL 70MM GL|Y
01|105077|44|1|CAT40 TAPER PLUS 16MM END MILL 70MM GL|Y
01|105077|46|1|CAT40 TAPER PLUS 20MM END MILL 70MM GL|Y
01|105077|64|1|NO 3/32 ER 32 Collet can use 3MM|Y
01|105092|20|1|Retention knobs quoted at promotion price of 1 knob per|Y
01|105092|20|2|holders quoted.|Y
01|105100|1|1|for DMG Mori Mill tap 700|Y
01|105100|1|2|*coolant through|Y
01|105104|1|1|Part Number TBD= Mimatic #193967|Y
01|105104|1|2|CAT50 AH ER11 slim offset external coolant|Y
01|105104|2|1|Part Number TBD= Mimatic #193967|Y
01|105104|2|2|CAT50 AH ER11 slim offset external coolant|Y
01|105104|3|1|Part Number TBD= Mimatic #193967|Y
01|105104|3|2|CAT50 AH ER11 slim offset external coolant|Y
01|105105|1|1|SK6-0.5 SK6 Slim Chuck Collet 0.5mm|Y
01|105105|1|2|Quoted as net pricing non-returnable non-cancelable|Y
01|105107|1|1|ETA 12/1|Y
01|105107|2|1|ETA 12/1|Y
01|105132|1|1|Quoted at net pricing.|Y
01|105138|53|1|Quoted as NET pricing non-returnable non-cancelebale|Y
01|105155|1|1|This is the new part number replacing C40SF-8-160|Y
01|105162|3|1|We do not carry a 10.|Y
01|105169|2|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|105169|2|2|External Cables Service Time & Travel.|Y
01|105173|1|1|Okuma Static X-axis OD1in 12V Turret <Side>|Y
01|105173|2|1|Okuma Static Z-axis ID1in 12V Turret <Face>|Y
01|105186|4|1|Installation by two days @ customer facilities|Y
01|105186|4|2|Includes labor and trip expenses.|Y
01|105186|4|3|Interface is not included.|Y
01|105190|1|1|Non standard stock at NET price|Y
01|105203|1|1|*NO WOODEN CASE INCLUDED|Y
01|105203|1|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|105203|2|1|*WOODEN CASE INCLUDED|Y
01|105203|2|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|105204|3|1|Includes drive unit external/interface cables short|Y
01|105204|3|2|bar communications cable fiber optic cable labor|Y
01|105204|3|3|travel expenses|Y
01|105216|6|1|PRCE IS NET TO DMG MORI|Y
01|105216|6|2|PRICE INCLUDES SERVO AMP|Y
01|105221|1|1|*Qty Break Pricing: (1-3pc)|Y
01|105221|2|1|*Qty Break Pricing: (4-8pc)|Y
01|105221|3|1|*Qty Break Pricing: (9-12pc)|Y
01|105221|8|1|*Qty Break Pricing: (1-3pc)|Y
01|105221|9|1|*Qty Break Pricing: (4-8pc)|Y
01|105221|10|1|*Qty Break Pricing: (9-12pc)|Y
01|105221|16|1|Position block made by L&N.|Y
01|105221|16|2|Spindle drawing confirmation required.|Y
01|105221|16|3|Machine: Mazak HNC-8800|Y
01|105221|16|4|1x per machine required|Y
01|105228|53|1|Quoted as NET pricing non-returnable non-cancelebale|Y
01|105231|5|1|EXTERNAL CABLE SET|Y
01|105231|9|1|COMPLETE 4TH AXIS INSTALLATION. SERVO MOTOR ADDITIONAL|Y
01|105231|9|2|AXIS DRIVE INTERNAL CABLES FIBRE OPTICS ALL|Y
01|105231|9|3|CONNECTORS TRAVEL AND LABOR|Y
01|105239|6|1|Custom Positioning Block based on Customer provided|Y
01|105239|6|2|machine specs.|Y
01|105244|5|1|Main & Sub Spindle ER32|Y
01|105250|15|1|No collapsable collet in SK16 inch size|Y
01|105263|1|1|6475-2129-101018|Y
01|105271|1|1|MOTOR SPECIFICATION TO BE PROVIDED BY HURCO.|Y
01|105271|1|2|CNC260 USES ALPHA4 MOTOR|Y
01|105271|2|1|LYNDEX NIKEN CAN PROVIDE CABLES BUT WE WILL NEED|Y
01|105271|2|2|SCHEMATICS PROVIDED FOR HURCO SIDE|Y
01|105271|3|1|LYNDEX NIKKEN CAN PROVIDE CABLES BUT WE WILL NEED|Y
01|105271|3|2|SCHEMATICS PROVIDED FOR HURCO SIDE|Y
01|105278|2|1|SUBSTITUTED FOR 1/4 COLLET|Y
01|105298|1|1|This option is for either for our installation of the|Y
01|105298|1|2|customer supplied RFID chip or we can create the hole|Y
01|105298|1|3|for the customer to install the chip on site|Y
01|105298|1|4|We will need option confirmed at time of order|Y
01|105325|1|1|C5-Q26-50U (CAPTO C5 taper adapter for emac boring head|Y
01|105325|2|1|C5-Q26-140U CAPTO C5 taper adapter for emac boring head|Y
01|105327|3|1|NBT50-SK10C-120|Y
01|105327|3|2|2Lock TaperPlus NBT50 SK10 Slim Chuck Coolant|Y
01|105327|4|1|NBT50-SK13C-120|Y
01|105327|4|2|2Lock TaperPlus NBT50 SK10 Slim Chuck Coolant|Y
01|105327|7|1|NBT50-SKT6C-105P          2Lock TaperPlus NBT40|Y
01|105327|7|2|SK10 SlimChuck Coolant Hi Speed Rigid|Y
01|105327|8|1|NBT50-SKT10C-105P                2Lock TaperPlus NBT50|Y
01|105327|8|2|SK10 Slim Chuck Taper type Hi-Speed|Y
01|105327|9|1|NBT50-C16-105|Y
01|105327|9|2|2Lock TaperPlus NBT50 16mm Milling Chuck|Y
01|105327|11|1|SK10-3AC|Y
01|105327|11|2|SK10 Slim Chuck Collet 3.0mm On Size Coolant MechSealed|Y
01|105329|13|1|Option #2 Start II with 10 free holders listed above.|Y
01|105329|14|1|This price includes 10 free holders of the customers|Y
01|105329|14|4|choice from list of Extended type holders.|Y
01|105332|2|1|THIS PRICE IS NET TO RMP.|Y
01|105332|2|2|SPINDLE DRAWINGS AND LAYOUT WILL BE NEEDED BEFORE|Y
01|105332|2|3|POSITIONING BLOCK IS MANUFACTURED.|Y
01|105337|1|1|Quoted as NET pricingnon-cancelablenon-returnable|Y
01|105337|3|1|Quoted as NET pricingnon-cancelablenon-returnable|Y
01|105352|3|1|Includes interface cables external cables drive unit|Y
01|105352|3|2|labor travel expenses|Y
01|105352|3|4|Ladder/Software is the responsibility of Campat|Y
01|105356|3|1|EXTERNAL 4TH AXIS POWER/FEEDBACK CABLES FOR|Y
01|105356|3|2|SAMSUNG MCV500 VERTICAL MACHINING CENTER.|Y
01|105356|4|1|INSTALLATION FEE INCLUDES THE FOLLOWING ITEMS:|Y
01|105356|4|2|FANUC ROTARY TABLE MOTOR 4TH AXIS SERVO AMPLIFIER|Y
01|105356|4|3|PNEUMATIC VALVE BULKHEAD CABLES AND WIRING.|Y
01|105356|4|4|ALSO INCLUDED: OEM LADDER MODIFICATIONS FOR PROPER|Y
01|105356|4|5|4TH AXIS OPERATION.|Y
01|105356|4|6|TRAVEL EXPENSES FOR LYNDEX NIKKEN INSTALL TECHNICIAN|Y
01|105356|4|7|IS ALSO INCLUDED INTO THE $8500 INSTALL CHARGE.|Y
01|105360|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|105360|1|2|ETA 16 WKS UPON Drawing approval|Y
01|105360|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|105360|2|2|ETA 11 WKS UPON drawing approval|Y
01|105360|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|105360|3|2|ETA 16 WKS UPON drawing approval|Y
01|105360|3|3|Sauter DIN5480 VDI30 ER25 External Coolant|Y
01|105384|1|1|BT50 Right Angle Head per Print|Y
01|105384|1|2|Net price quote for 1 head.|Y
01|105384|1|3|BT50 Right Angle Head ER25 output with adapter to fit|Y
01|105384|1|4|Omega 50M VTL.  Coolant input through spindle and also|Y
01|105384|1|5|through machine specific pin.  Coolant output through|Y
01|105384|1|6|cutting tool & exterior nozzles.Max torque 30Nm 8000rpm|Y
01|105384|2|1|BT50 Right Angle Head per Print|Y
01|105384|2|2|Net price quote for 2 heads.|Y
01|105384|2|3|BT50 Right Angle Head ER25 output with adapter to fit|Y
01|105384|2|4|Omega 50M VTL. Coolant input through spindle and also|Y
01|105384|2|5|through machine specific pin. Coolant output through|Y
01|105384|2|6|cutting tool & exterior nozzles.Max torque 30Nm 8000rpm|Y
01|105385|5|1|EXTERNAL CABLE SET|Y
01|105385|9|1|COMPLETE 4TH AXIS INSTALLATION. SERVO MOTOR ADDITIONAL|Y
01|105385|9|2|AXIS DRIVE INTERNAL CABLES FIBRE OPTICS ALL|Y
01|105385|9|3|CONNECTORS TRAVEL AND LABOR|Y
01|105386|2|1|LIVE TOOL CERTIFICATE AT LIST PRICE.|Y
01|105386|2|2|`|Y
01|105389|2|1|Installation includes: drive unit short bar fiber|Y
01|105389|2|2|optic cables communication cables bulk head cable|Y
01|105389|2|3|set external cable set parameter changes service|Y
01|105389|2|4|time and travel|Y
01|105394|1|1|YASNAC MOTORS AND CABLES TO BE SUPPLIED BY HFO|Y
01|105395|3|1|Installed on HSK63A-sf25-160B|Y
01|105395|8|1|Installed on HSK63A-sf25-160B|Y
01|105395|9|1|Installed on HSK63A-sf25-160B|Y
01|105396|1|1|Package includes: Rotary table with face plate|Y
01|105396|1|2|bulkhead cables external cable parameter changes|Y
01|105396|1|3|service time and travel. Utilizing DDR drive unit.|Y
01|105396|2|1|Package includes:High Speed rotary table w/face plate|Y
01|105396|2|2|bulkhead cables external cable parameter changes|Y
01|105396|2|3|service time and travel. Utilizing DDR drive unit.|Y
01|105414|1|1|Includes a Set of 5AX-2MT-130-150SA-BR2-QT/R650 Tables|Y
01|105417|1|1|*comes w/ 40-taper spindle|Y
01|105418|1|1|Howa H09M12 for Okuma LB2000|Y
01|105464|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|105464|4|2|External Cables Service Time and Travel.|Y
01|105468|2|1|2.75 GAUGE LENGTH|Y
01|105468|4|1|TAP SIZE #0-9/16|Y
01|105468|5|1|TAP SIZE 5/16-7/8|Y
01|105475|1|1|Table to be configured the same as S/N 15662NT|Y
01|105475|2|1|TCE-A3060 Power Cable|Y
01|105475|3|1|Feedbac Cable|Y
01|105475|5|1|4P RJ|Y
01|105475|6|1|4P RJ|Y
01|105475|9|1|TCD-37313|Y
01|105488|1|1|one time special discount for test only|Y
01|105488|1|2|non-returnable non -cancelable|Y
01|105516|1|1|This is closest substitute for the  W1005-0562-4.88(C)|Y
01|105516|1|2|which is no longer available|Y
01|105532|1|1|Tool Cert# 20880-2152-110718|Y
01|105568|3|1|NET PRICE TO MORRIS|Y
01|105583|2|1|EXTERNAL POWER AND FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|105585|3|1|EXTERNAL CABLES SET (2 AXIS)|Y
01|105596|1|1|Reference RGA# TOR-52806|Y
01|105596|1|2|CAT40U-SKO25-145 The unit seems a little rough and|Y
01|105596|1|3|would like to know if the unit needs new bearings.|Y
01|105596|4|1|Replate and grinding of spindle shaft.|Y
01|105596|4|2|Delivery will be 2 weeks from PO|Y
01|105597|1|1|Quoted as net pricing non-returnable non-cancelable|Y
01|105597|1|2|Pull stud is installed at factory|Y
01|105597|1|3|Price includs pull stud|Y
01|105597|2|1|Pull stud is installed to Holder in the factory|Y
01|105604|1|1|Table to be configured the same as S/N 15662NT|Y
01|105604|2|1|4P RJ (Rotary Joint)|Y
01|105626|1|1|5-9 PC Pricing|Y
01|105626|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|105626|2|1|10+ PC pricing|Y
01|105626|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|105638|3|1|**Option Taper Plus (Dual Contact) can work in|Y
01|105638|3|2|Std CAT40 spindle|Y
01|105650|4|1|*** 60mm 120mm & 150mm also available ***|Y
01|105650|10|1|***************************************|Y
01|105650|10|2|* 60mm 120mm & 150mm also available *|Y
01|105680|1|1|Reference RGA# TAR-52683|Y
01|105680|1|2|5AX-4MT-105-105-120FA s/n: 2055|Y
01|105680|1|3|Table needs complete rebuild.|Y
01|105690|1|1|This is not standard stock item|Y
01|105690|1|2|Quoted as net pricing non-returnable non-cancelable|Y
01|105702|3|1|**2.25 gl|Y
01|105702|4|1|**2.50 gl|Y
01|105702|14|1|**to hold .201|Y
01|105712|1|1|same RT model as serial# 26793TC|Y
01|105712|2|1|same TAT model as serial# 4557B|Y
01|105712|2|2|when the current stock is depleted next availability|Y
01|105712|2|3|will be end/3/2019- early/4/2019|Y
01|105717|2|1|Warranty replacement for defective unit originally|Y
01|105717|2|2|shipped on Inv# 2199843|Y
01|105717|2|3|Eric H will determine if the original unit must be|Y
01|105717|2|4|returned.|Y
01|105731|1|1|CONVERSION NORMALLY TAKES A FEW DAYS. FANUC IN STOCK|Y
01|105731|2|1|POWER/FEEDBACK EXTERNAL CABLES FOR 4TH/5TH AXIS|Y
01|105748|14|1|For Hathor|Y
01|105748|17|1|1 Day/ 8 Hours of Training of HATHOR Presetter|Y
01|105748|17|2|at customer's location|Y
01|105759|5|1|120mm/ 4.72 gl|Y
01|105759|6|1|135mm/ 5.31 gl|Y
01|105768|1|1|Reference RGA# LVR-52738|Y
01|105768|1|2|MZST68-ER32Z-MS-OFF s/n: 9071701 (Mim# 191010)|Y
01|105768|2|1|Input spindle gears bearings seals & o-rings must|Y
01|105768|2|2|be replaced.|Y
01|105768|2|3|Labor is included.|Y
01|105769|1|1|Reference RGA# LVR-52871|Y
01|105769|1|2|MNL12-SK20X-ICE-10K s/n: 8870005 (184649)|Y
01|105769|2|1|Bearings seals and o-rings must be replaced.|Y
01|105769|2|2|Labor is included.|Y
01|105772|1|1|1.0 ID Turning Tool Holder|Y
01|105772|2|1|1.0 OD Turning Tool Holder|Y
01|105772|3|1|1.5 Boring Bar Holder|Y
01|105797|1|1|Includes Cable Set for Matsuura Vx1000|Y
01|105797|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|105797|3|2|External Cables Service Time & Travel|Y
01|105798|68|1|SKJ25-19.5C is special. Minimum order 5 pcs|Y
01|105798|69|1|Can be machined for SKJ25-19.5C.|Y
01|105805|5|1|Positive Air Purge - Modified Oil Cap Air Regulator &|Y
01|105805|5|2|Air Line.|Y
01|105805|6|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|105805|6|2|External Cables Service Time & Travel - Hyundai KF5600|Y
01|105808|4|1|Includes Installation Drive Units Bulkhead Cables|Y
01|105808|4|2|External Cables Service Time & Travel|Y
01|105808|5|1|$1000.00 Complimentary Tooling Certificate for End User|Y
01|105808|5|2|with purchase of 5AX-201FA-M Rotary Table.|Y
01|105827|3|1|Tilt and rotary axis scale option.|Y
01|105827|3|2|Includes: +/-10 tilt axis scale with mounting kit.|Y
01|105827|3|3|Includes: +/-5 rotary axis scale with mounting kit.|Y
01|105827|3|4|Includes: Risers for rotary axis scale clearence|Y
01|105827|5|1|Installation includes: Dual axis drive short bar|Y
01|105827|5|2|fiber optic cables communications cables bulkhead|Y
01|105827|5|3|cables external cables parameter changes service|Y
01|105827|5|4|time and travel.|Y
01|105827|5|5|Does not include: Fanuc addional axis software option.|Y
01|105827|6|1|135MM thick riser plate for tailstock to match table|Y
01|105845|2|1|5AX installation on Haas SN:42011|Y
01|105855|3|1|20% EXTRA DISCOUNT NEEDS TO BE PASSED TO LEKTRON|Y
01|105855|3|2|THESE 4 TOOLS WERE USED AS LOANS AT IMS MACHINING|Y
01|105855|3|3|THEY HAVE BEEN INSPECTED AND STILL HAVE NORMAL WARRANTY|Y
01|105855|6|1|INCLUDED AT NO COST TO LEKTRON|Y
01|105871|1|1|Spanner Wrench for OK101-14000/OKL3-ER32X|Y
01|105875|6|1|Positive Air Purge - Modified Oil Cap Air Regulator &|Y
01|105875|6|2|Air Line.|Y
01|105875|7|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|105875|7|2|External Cables Service Time & Travel - Hyundai KF5600|Y
01|105889|1|1|This is not standard stock item|Y
01|105889|1|2|non-returnable no-cancelable|Y
01|105891|1|1|**NET PRICE|Y
01|105891|1|2|C5057-0020-12.00 Modified DIN - Coolant thru the flange|Y
01|105893|1|1|1 PC Stock balance ETA 13-14 WKS|Y
01|105900|6|1|16 3 JAW STEEL BODY CHUCK PACKAGE.|Y
01|105900|6|2|PACAKGE INCLUDES 16 3 JAW SET TRU CHUCK 2 PC JAWS|Y
01|105900|6|3|FINISHED ADAPTER PLATE T-NUTS MOUNTING BOLTS AND|Y
01|105900|6|4|ASSEMBLY DRAWING. CHUCK THROUGH HOLE 5.3543 DIA|Y
01|105900|7|1|PRICE IS NET TO P.D. BROWN|Y
01|105900|7|2|PRICE INCLUDES SERVO AMP AND ALL NECESSARY MISC ITEMS|Y
01|105900|7|3|TO PROPERLY AND PROFESSIONALLY INTEGRATE THE CNC401|Y
01|105905|6|1|16 3 JAW STEEL BODY BIG BORE CHUCK PACKAGE.|Y
01|105905|6|2|PACAKGE INCLUDES 16 3 JAW SET TRU CHUCK 2 PC JAWS|Y
01|105905|6|3|FINISHED ADAPTER PLATE T-NUTS MOUNTING BOLTS AND|Y
01|105905|6|4|ASSEMBLY DRAWING. CHUCK THROUGH HOLE 8.66 DIA|Y
01|105905|6|5|FINALY PRICE AND AVAILABITY QUOTED UPON REQUEST.|Y
01|105905|7|1|PRICE IS NET TO P.D. BROWN|Y
01|105905|7|2|PRICE INCLUDES SERVO AMP AND ALL NECESSARY MISC ITEMS|Y
01|105905|7|3|TO PROPERLY AND PROFESSIONALLY INTEGRATE THE CNC401|Y
01|105908|1|1|HSK125A-0032-4.30|Y
01|105908|1|2|HSK125A Taper ER32 Collet Chuck with 4.30 gage length|Y
01|105908|4|1|HSK125A-0032-6.00|Y
01|105908|4|2|HSK125A ER32 Collet Chuck with 6.00 gage length|Y
01|105913|3|1|ETA aprox 2 weeks|Y
01|105913|9|1|1pc stock remainder ETA aprox 1/03/2019|Y
01|105913|16|1|5pc stock remaining balance ETA aprox 1/3/2018|Y
01|105913|17|1|2pc Stock remainder ETA aprox 1/03/2019|Y
01|105915|1|1|For NAKAMURA SC100 L3=49mm|Y
01|105915|1|2|JPY250690($1=110) No Nut No Wrench|Y
01|105915|2|1|For NAKAMURA SC100 L3=53mm >> OK|Y
01|105915|2|2|JPY216920($1=110) No Nut No Wrench|Y
01|105916|1|1|Reference RGA# TAR-52720|Y
01|105916|1|2|5AX-2MT-105-120FA s/n: 8184|Y
01|105916|1|3|A-Axis not repeating on the left spindle.|Y
01|105916|49|1|Rotary side wireharness set.|Y
01|105917|1|1|Stop is included with chuck.|Y
01|105931|1|1|HSK50C-SZF25-100|Y
01|105931|2|1|HSK50C-SZF16-90|Y
01|105931|3|1|HSK50C-SZF10-80|Y
01|105931|4|1|HSK50C-SZF6-60|Y
01|105937|4|1|Offered as an in stock option|Y
01|105945|3|1|Installation includes: drive unit short bar fiber|Y
01|105945|3|2|optic cables communication cables bulk head cable|Y
01|105945|3|3|set external cable set parameter changes service|Y
01|105945|3|4|time and travel|Y
01|105950|4|1|Includes interface/external cables drive unit fiber|Y
01|105950|4|2|optic cable communications cable short bar travel|Y
01|105950|4|3|labor and expenses|Y
01|105954|1|1|Special price for Cubic Industries.|Y
01|105966|1|1|Includes:  Case CAT40-SK16-60U-IDU 3 SK16 Collets|Y
01|105966|1|2|(3/8 1/2 5/8) Spanner Wrench|Y
01|105968|2|1|See below.|N
01|105969|1|1|Part Number TBD/ #11 Pusher for H09M11 U-652|Y
01|105969|1|2|Net price quoted.|Y
01|105997|1|1|E32-EXT-100 with 13 OAL|Y
01|106002|7|1|*works w/ SK20 & 3/4 MC|Y
01|106004|1|1|Face Value: $4000.00|Y
01|106011|3|1|INSTALLATION PACKAGE INCLUDES:|Y
01|106011|3|2|FANUC MOTORS 4TH AXIS SERVO AMPLIFIER BULKHEAD|Y
01|106011|3|3|CABLES/WIRING FROM ELECTRICAL CABINET.|Y
01|106011|3|4|OEM LADDER MODIFICATIONS FOR PROPER TABLE OPERATION|Y
01|106011|3|5|ARE ALSO INCLUDED INTO THE INSTALLATION COST.|Y
01|106011|3|6|LYNDEX NIKKEN SERVICE TECHNICIAN TRAVEL EXPENSES|Y
01|106011|3|7|ARE ALSO INCLUDED.|Y
01|106011|5|1|$1000 TOOLING CERTIFICATE INLCLUDED AT NO COST|Y
01|106020|1|1|IT40-SK16-60|Y
01|106020|1|2|Quoted as NET pricing Non-returnableNon-cancelable|Y
01|106031|3|1|Hold #4 drill|Y
01|106031|11|1|*included w/ installed coolant tube and Balluff|Y
01|106031|11|2|chip|Y
01|106031|12|1|*included w/ installed coolant tube and Balluff|Y
01|106031|12|2|chip|Y
01|106031|13|1|*included w/ installed coolant tube and Balluff|Y
01|106031|13|2|chip|Y
01|106033|3|1|Price is included to the Pre-setter|Y
01|106038|1|1|P/N: CAT50-SF0750-12.00|Y
01|106038|1|2|CAT50 Taper 3/4 Shrink Fit Holder with 12.00 gage|Y
01|106038|1|3|length|Y
01|106055|1|1|Reference RGA# LVR-52946|Y
01|106055|1|2|Repair of customer's MNL12-ER32Z s/n:|Y
01|106055|1|3|(Alps# T32207)|Y
01|106055|2|1|Bearings Drive Shaft Spindle Shaft Gears and Collet|Y
01|106055|2|2|Nut to be replaced.|Y
01|106058|1|1|P/N: CAT50-SF0750-12.00|Y
01|106058|1|2|CAT50 Taper 3/4 Shrink Fit Holder with 12.00 gauge|Y
01|106058|1|3|length|Y
01|106059|1|1|P/N: CAT50-SF0750-12.00|Y
01|106059|1|2|CAT50 Taper 3/4 Shrink Fit Holder with 12.00 gauge|Y
01|106059|1|3|Length|Y
01|106069|2|1|2 pc pricing 25%|Y
01|106094|1|1|Includes Haas Motors and Cable Set|Y
01|106159|1|1|Reference RGA# LVR-52870|Y
01|106159|1|2|Repair of MNL12-ER11 (X)-SUB-SP s/n: 61931 04|Y
01|106159|1|3|(Mimatic# 183938)|Y
01|106159|2|1|Bearings seals and o-rings to be replaced.|Y
01|106159|4|1|Reference RGA# LVR-52870|Y
01|106159|4|2|Repair of MNL12-ER11 (X)-SUB-SP s/n: 81998 02|Y
01|106159|4|3|(Mimatic# 183938)|Y
01|106159|5|1|Bearings seals and o-rings to be replaced.|Y
01|106159|7|1|Reference RGA# LVR-52870|Y
01|106159|7|2|Repair of MNL12-ER11 (X)-SUB-SP s/n: 81998 01|Y
01|106159|7|3|(Mimatic# 183938)|Y
01|106159|8|1|Bearings seals and o-rings to be replaced.|Y
01|106159|10|1|Reference RGA# LVR-52870|Y
01|106159|10|2|Repair of MNL12-ER11 (X)-SUB-SP s/n: 87119 02|Y
01|106159|10|3|(Mimatic# 183938)|Y
01|106159|11|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|106159|11|2|spindles as needed.|Y
01|106163|3|1|PLEASE CONFIRM SHANK AND FLAT DIA WHERE POSSIBLE|Y
01|106163|3|2|SHANK: 2.5MM|Y
01|106163|3|3|FLAT: 2.1MM|Y
01|106163|4|1|PLEASE CONFIRM SHANK AND FLAT DIA WHERE POSSIBLE|Y
01|106163|4|2|SHANK: 2.8MM|Y
01|106163|4|3|FLAT: 2.1MM|Y
01|106163|5|1|PLEASE CONFIRM SHANK AND FLAT DIA WHERE POSSIBLE|Y
01|106163|5|2|SHANK: 4.0MM|Y
01|106163|5|3|FLAT: 3.0MM|Y
01|106163|6|1|PLEASE CONFIRM SHANK AND FLAT DIA WHERE POSSIBLE|Y
01|106163|6|2|SHANK: 4.5MM|Y
01|106163|6|3|FLAT: 3.4MM|Y
01|106163|7|1|PLEASE CONFIRM SHANK AND FLAT DIA WHERE POSSIBLE|Y
01|106163|7|2|SHANK: 6.0MM|Y
01|106163|7|3|FLAT: 4.9|Y
01|106163|8|1|PLEASE CONFIRM SHANK AND FLAT DIA WHERE POSSIBLE|Y
01|106163|8|2|SHANK: 7.0MM|Y
01|106163|8|3|FLAT: 5.5MM|Y
01|106163|9|1|PLEASE CONFIRM SHANK AND FLAT DIA WHERE POSSIBLE|Y
01|106163|9|2|SHANK: 8.0MM|Y
01|106163|9|3|FLAT: 6.2MM|Y
01|106163|10|1|PLEASE CONFIRM SHANK AND FLAT DIA WHERE POSSIBLE|Y
01|106163|10|2|SHANK: 9.0MM|Y
01|106163|10|3|FLAT: 7.0MM|Y
01|106163|11|1|PLEASE CONFIRM SHANK AND FLAT DIA WHERE POSSIBLE|Y
01|106163|11|2|SHANK: 10.0MM|Y
01|106163|11|3|FLAT: 8.0MM|Y
01|106163|12|1|PLEASE CONFIRM SHANK AND FLAT DIA WHERE POSSIBLE|Y
01|106163|12|2|SHANK: 11.0MM|Y
01|106163|12|3|FLAT: 9.0MM|Y
01|106164|1|1|1 pc. in 2 Weeks and 5 pcs. in 8-9 Weeks|Y
01|106208|2|1|ACCURACY +/- 5 ARC SECONDS|Y
01|106208|3|1|Cable setup to 10ft|Y
01|106208|6|1|ACCURACY +/- 5 ARC SECONDS|Y
01|106208|7|1|cable set to 10FT|Y
01|106210|3|1|In stock sub for B4016-0125-4.00.This is a balanceable|Y
01|106210|3|2|version|Y
01|106222|1|1|first ETA 2/8|Y
01|106222|1|2|second ETA 3/27|Y
01|106228|1|1|Shaft Length (Medium) = 117.55mm|Y
01|106256|1|1|Special price for Cubic Industries.|Y
01|106256|5|1|NCAT40-MDSK20-75U|Y
01|106256|5|2|NCAT40 SK20 Major Dream Holder|Y
01|106256|6|1|NCAT40-MDSK20-90U|Y
01|106256|6|2|NCAT40 SK20 Major Dream Holder|Y
01|106256|7|1|NCAT40-MDSK20-105U|Y
01|106256|7|2|NCAT40 SK20 Major Dream Holder|Y
01|106256|8|1|NCAT40-MDSK20-120U|Y
01|106256|8|2|NCAT40 SK20 Major Dream Holder|Y
01|106256|9|1|NCAT40-NPU13-130|Y
01|106256|9|2|NCAT40 1/2 NPU Keyless Drill Chuck|Y
01|106256|10|1|NCAT40-Z16-109U|Y
01|106256|10|2|NCAT40 Z16 Tension/Compression Tap|Y
01|106258|1|1|Reference RGA# TOR-52699|Y
01|106258|1|2|HSK63A-NPU13C-135 Damaged jaws.|Y
01|106295|17|1|Range .688-.750; Substituted for 3/4 @ NO CHARGE|Y
01|106295|18|1|Range .813-.875; Substituted for 7/8 @ NO CHARGE|Y
01|106299|1|1|T11010|Y
01|106299|2|1|T11015|Y
01|106299|3|1|T11013|Y
01|106299|4|1|T21023|Y
01|106299|5|1|T21025|Y
01|106303|1|1|Reference RGA# TOR-52842|Y
01|106303|1|2|2 x CAT40-NPU13-105U Sending in for evaluation.|Y
01|106325|5|1|7/8in=22.2mm|Y
01|106327|1|1|Alps Japan Stock AIR Cut 12/21 for ETA 1/4~7 to|Y
01|106327|1|2|Lyndex-Nikken. Quoted at NET price.|Y
01|106331|1|1|Alps Japan Stock AIR Cut 12/21 for ETA 1/4~7 to|Y
01|106331|1|2|Lyndex-Nikken. Quoted at NET price.|Y
01|106333|1|1|Reference RGA# TAR-52888|Y
01|106333|1|2|CNC302FA-M s/n: 10421C|Y
01|106333|13|1|Freight charges for setting up pickup of table from|Y
01|106333|13|2|CA to Lyndex-Nikken IL.|Y
01|106341|5|1|HSK100A-C16-90|Y
01|106341|5|2|HSK100A taper 16mm Milling Chuck w 90mm gage length|Y
01|106343|3|1|3 PC MINIMUM|Y
01|106368|1|1|Reference RGA# TOR-52949|Y
01|106368|1|2|CAT50-UMT200UH The light is not coming on when the|Y
01|106368|1|3|probe touches the part.|Y
01|106369|7|1|SF-POT-C6|Y
01|106369|8|1|SF-POT-C4|Y
01|106369|9|1|SF-POT-C5|Y
01|106375|1|1|Reference RGA# TAR-52906|Y
01|106375|1|2|CNC260 s/n:8941C|N
01|106377|1|1|CW INPUT CCW OUT|Y
01|106377|1|2|CCW INPUT CW OUT|Y
01|106378|2|1|Price quote $5.00 knob per holder promo|Y
01|106386|3|1|Kit includes: Drive external cables internal cables|Y
01|106386|3|2|fiber optic cables short bar and Fanuc|Y
01|106386|3|3|battery.|Y
01|106386|3|4|*** Equipment data sheets must be submitted to L-N|Y
01|106386|3|5|before the release of product.|Y
01|106406|2|1|Cable Sets|Y
01|106406|3|1|Includes Installation Drive Units Bulkhead Cables|Y
01|106406|3|2|External Cables Service Time and Travel.|Y
01|106412|1|1|KS-CN262L-FA6 Motor Cover|Y
01|106415|1|1|Repair for Rotary Table CNC260 s/n 39410|Y
01|106415|1|2|Customer asked table to send in for evaluation|Y
01|106415|1|3|RGA # TAR-52906|Y
01|106416|4|1|Shank Modified per Drawing PT457533|Y
01|106447|1|1|Used RT was inspected and tested. Condition AS IS|Y
01|106465|1|1|MSA01-6L000 Cross|Y
01|106465|2|1|MSA01-6J000|Y
01|106466|7|1|holds .359|Y
01|106466|9|1|holds .516|Y
01|106466|15|1|holds .435|Y
01|106466|16|1|holds .562|Y
01|106466|18|1|.255x.191 tap|Y
01|106466|20|1|.429x.322 tap|Y
01|106466|20|2|IF it is actually a DIN M14 tap with .433 x .354|Y
01|106466|20|3|this tap collet will not work. Please confirm!|Y
01|106466|22|1|.590x.442 tap|Y
01|106470|2|1|BUY BACK PRICING|Y
01|106478|1|1|Reference RGA# TAR-52933|Y
01|106478|1|2|CNC202FA-M s/n:26252TC|N
01|106487|1|1|Reference RGA# TAR-52933|Y
01|106487|1|2|TAT-105 s/n:4415B|N
01|106494|2|1|Installation includes: drive unit short bar fiber|Y
01|106494|2|2|optic cables communication cables bulk head cable|Y
01|106494|2|3|set external cable set parameter changes service|Y
01|106494|2|4|time and travel|Y
01|106499|9|1|INCLUDES SERVO MOTOR INTERNAL WIRE HARNESS BULKHEAD|Y
01|106499|9|2|CONNECTORS FIBRE OPTIC CABLECONNECTORSAMPLIFIER|Y
01|106499|9|3|TRAVEL LODGING AND TRAINING|Y
01|106499|9|4|ALSO INCLUDES INSTALL OF TAILSTOCK AND LEVER SWITCH|Y
01|106509|6|1|120mm/ 4.72 gl|Y
01|106509|7|1|135mm/ 5.31 gl|Y
01|106522|1|1|B3005-0562-61(C)|Y
01|106522|1|2|BT30 Tension/Compression Tap Holder Coolant Thru|Y
01|106522|1|3|Quoted as net pricing non-returnable non-cancelable|Y
01|106522|2|1|HSK50A-TC0562-80(C)|Y
01|106522|2|2|HSK50A Tension/Compression Tap Holder Coolant|Y
01|106522|2|3|Quoted as net pricing non-returnable non-cancelable|Y
01|106531|1|1|Reference RGA# TAR-52942|Y
01|106531|1|2|CNC321A21 s/n: 10262|N
01|106546|1|1|Includes (2)CAT40 Pots|Y
01|106603|1|1|new part# NCAT50-C32-165U-IDU|Y
01|106603|1|2|Taper Plus CAT50 32mm Milling Chuck w/ 165mm Gl|Y
01|106603|1|3|w/ ID Chip Hole|Y
01|106627|2|1|Exterbal power and feedback cables for 4th axis|Y
01|106627|3|1|Quoted as NET pricing|Y
01|106627|3|2|Installation includes:4th axis drive and motorbulk|Y
01|106627|3|3|head connectorselectrical cabinet wiring & travel|Y
01|106627|3|4|plus lodging for Lyndex-Nikken technician|Y
01|106629|2|1|Exterbal power and feedback cables for 4th axis|Y
01|106629|3|1|Quoted as NET pricing|Y
01|106629|3|2|Installation includes:4th axis drive and motorbulk|Y
01|106629|3|3|head connectorselectrical cabinet wiring & travel|Y
01|106629|3|4|plus lodging for Lyndex-Nikken technician|Y
01|106641|7|1|ZKG12-3/8 #1 TorqCon Tap Collet|Y
01|106651|1|1|Reference RGA# TAR-52733|Y
01|106651|1|2|5AX-2002FA s/n: 1558|N
01|106667|1|1|1 x P/N: C4006-0500-2.50 on b/o ETA 1/30|Y
01|106667|1|2|we can break the tool package open and ship the items|Y
01|106667|1|3|that are available at the same price. Pls ask|Y
01|106673|4|1|Installation includes: Dual axis drive short bar|Y
01|106673|4|2|fiber optic cables communications cables bulkhead|Y
01|106673|4|3|cables external cables parameter changes service|Y
01|106673|4|4|time and travel.|Y
01|106673|8|1|Installation includes: Dual axis drive fiber optic|Y
01|106673|8|2|cables communications cables bulkhead cables|Y
01|106673|8|3|external cables parameter changes service time and|Y
01|106673|8|4|travel.|Y
01|106673|9|1|Option if 5AX-201FA-M does not fit.|Y
01|106694|1|1|ZKN38-30|Y
01|106694|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|106706|15|1|To Hold 7/8's|Y
01|106723|1|1|Net price reflects purchase order of 9 angle heads.|Y
01|106723|2|1|Net price reflects purchase order of 12 angle heads.|Y
01|106723|3|1|Net price reflects purchase order of 16 angle heads.|Y
01|106725|1|1|BUILT TO INTEGRATE WITH HAAS MACHINES|Y
01|106725|2|1|HEIDENHEIN GLASS SCALES FOR TILT AXIS|Y
01|106725|2|2|TILT ACCURACY WITH SCALE = +/- 10 ARC SECONDS|Y
01|106725|3|1|4TH/5TH AXIS EXTERNAL POWER/FEEDBACK CABLES|Y
01|106725|3|2|INCLUDED AT NO COST WITH PURCHASE OF ROTARY TABLE|Y
01|106728|2|1|Cable Set up to 2m|Y
01|106730|4|1|S-145 O-ring|Y
01|106730|8|1|S-80 O-ring|Y
01|106737|1|1|Tooling Certificate #21378-2112-092518|Y
01|106750|1|1|C5057-0032-12.00DIN --> C5057-0032-12.00|Y
01|106768|2|1|to hold 5/32|Y
01|106771|2|1|External & Bulkhead Cable Set|Y
01|106772|1|1|KS-CN262L-FA6 Motor Cover|Y
01|106775|1|1|AX250RRJ105030125_2|Y
01|106775|1|2|Center shaft for TCD-A6025|Y
01|106807|1|1|Reference RGA# MOD-52975|Y
01|106807|1|2|CNC200L s/n: 8365|N
01|106834|2|1|Installation includes: drive unit short bar fiber|Y
01|106834|2|2|optic cables communication cables bulk head cable|Y
01|106834|2|3|set external cable set parameter changes service|Y
01|106834|2|4|time and travel|Y
01|106857|1|1|Internal & External Coolant - 100mm Center Height|Y
01|106857|2|1|Internal & External Coolant - 72mm Center Height|Y
01|106880|1|1|Tooling Certificate #E20100-2185-122118|Y
01|106881|1|1|Includes Haas Motor & Cables|Y
01|106882|1|1|Reference RGA# TOR-52696|Y
01|106882|1|2|2 x BT40-NPU8-70|Y
01|106882|1|3|Sending in for evaluation/repair|Y
01|106883|1|1|Reference RGA# TAR-52960|Y
01|106883|1|2|CNC300 s/n: 1041|N
01|106908|2|1|Installation includes: drive unit short bar fiber|Y
01|106908|2|2|optic cables communication cables bulk head cable|Y
01|106908|2|3|set external cable set parameter changes service|Y
01|106908|2|4|time and travel|Y
01|106908|4|1|$ 1000 LIST PRICE TOOLING AT NO CHARGE|Y
01|106936|7|1|Installation includes: drive unit short bar fiber|Y
01|106936|7|2|optic cables communication cables bulk head cable|Y
01|106936|7|3|set external cable set parameter changes service|Y
01|106936|7|4|time and travel|Y
01|106968|5|1|Lyndex-Nikken to design and make block upon receipt|Y
01|106968|5|2|of spindle drawing information|Y
01|106980|12|1|11 STK 10 ETA 2/22 balance ETA Pending|Y
01|106980|15|1|9 PCS ETA 1/3 10 ETA 2/22Balance Pending|Y
01|106980|16|1|6pc stock balance 2/22|Y
01|106980|17|1|2pc Stock 19 PCS ETA 1/16 blance pending|Y
01|106984|2|1|Installation includes: Dual axis drive unti short bar|Y
01|106984|2|2|fiber optic cables communications cables bulkhead|Y
01|106984|2|3|cables external cables parameter changes service|Y
01|106984|2|4|time and travel.|Y
01|107005|1|1|Non-returnableNon-cancelable|Y
01|107013|4|1|100mm Center Height|Y
01|107019|2|1|Installation includes: drive unit short bar fiber|Y
01|107019|2|2|optic cables communication cables bulk head cable|Y
01|107019|2|3|set external cable set parameter changes service|Y
01|107019|2|4|time and travel|Y
01|107020|1|1|3/32-1/2 Capacity|Y
01|107060|1|1|Program development & onsite trial fee by 7/26/2018|Y
01|107060|2|1|Program development & onsite trial fee by IMTS 2018.|Y
01|107064|2|1|POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|107066|3|1|ETA aprox 2 weeks|Y
01|107066|7|1|1pc Stock remaining balance TBD|Y
01|107066|8|1|2pcs Stock remaining balance ETA aprox 1/16|Y
01|107066|9|1|1pc stock remainder ETA aprox 1/03/2019|Y
01|107066|12|1|11pcs stock remaining balance ETA aprox 2/22|Y
01|107066|14|1|5pc stock remaining balance ETA aprox 1/16|Y
01|107066|15|1|8pc ETA aprox 1/16 10pc ETA aprox 2/22 Remainder TBD|Y
01|107066|16|1|5pc stock remaining balance ETA aprox 1/3/2018|Y
01|107066|17|1|2pc Stock remainder ETA aprox 1/03/2019|Y
01|107066|19|1|1pc stock remainder balance ETA TBD|Y
01|107066|20|1|ETA aprox 2 weeks|Y
01|107066|21|1|ETA aprox 2 weeks|Y
01|107073|4|1|**5 Piece Minimum Required|Y
01|107087|1|1|***10pc min***|Y
01|107096|2|1|100mm Centerline|Y
01|107096|3|1|72mm Centerline - Considered Used cosmetic marks from|Y
01|107096|3|2|showroom/Open House - New Tool Warranty - 2 Years.|Y
01|107096|4|1|72mm Centerline|Y
01|107124|5|1|PRODUCTION HOLD|Y
01|107131|2|1|Lyndex-Nikken to make position block. Delivery is|Y
01|107131|2|2|upon receipt of spindle drawing.|Y
01|107131|2|3|*net price|Y
01|107153|1|1|MNZ20-ER25Z-OFF|Y
01|107153|1|2|P/N: 194164|Y
01|107153|1|3|DMG Live - ER25; 90 deg; Center offset|Y
01|107153|1|4|1:1 Gear ratio; Max torque 25Nm; 10000RPM;|Y
01|107153|1|5|External coolant through pipes; Direction of rotation|Y
01|107153|1|6|not reversal.|Y
01|107153|1|7|Ref Drwg# 00055026|Y
01|107154|1|1|1M/3FT 6mm Coil Spring|Y
01|107154|3|1|6 FT OF 6MM Air Line|Y
01|107178|1|1|HFO Tampa to supply correct motors|Y
01|107178|1|2|HFO Tampa to supply cables|Y
01|107178|1|3|SPECIAL DEMO DAY PRICING|Y
01|107178|3|1|COLLET CHUCK PROMO KIT|Y
01|107178|3|2|NO CHARGE|Y
01|107191|2|1|TCE-46011 Power Cable|Y
01|107194|15|1|Wrench required to tighten SK16 collet chuck|Y
01|107194|16|1|Wrench required to tighten SK10 collet chuck|Y
01|107197|1|1|Budgetary Quote for Bearings/Seals Repair + Labor|Y
01|107197|1|2|CNCZ105LSA-BR S/N 2147 TAR-53005|Y
01|107203|1|1|CAT40-SF0625-7.30|Y
01|107203|1|2|CAT40 5/8 Shrink Fit Holder w/ 7.30 gage length|Y
01|107204|1|1|Net price quoted.|Y
01|107208|2|1|Includes Installation Bulkhead and External Cables|Y
01|107208|2|2|Service Time & Travel. Use existing Drive Units.|Y
01|107227|5|1|**Taper Plus|Y
01|107227|7|1|**Taper Plus|Y
01|107236|5|1|holds .513|Y
01|107236|10|1|holds .190|Y
01|107236|11|1|holds .201|Y
01|107236|12|1|holds .159|Y
01|107236|13|1|holds .047|Y
01|107236|14|1|holds .109|Y
01|107236|15|1|holds .125|Y
01|107236|16|1|holds .190|Y
01|107236|17|1|holds .190|Y
01|107239|2|1|Net price quoted for modification.|Y
01|107241|3|1|Installation includes: Drive unit short bar fiber|Y
01|107241|3|2|optic cables communications cables external cables|Y
01|107241|3|3|bulkhead cables parameter changes service time and|Y
01|107241|3|4|travel.|Y
01|107245|2|1|customer providing balluf chip to be installed on|Y
01|107245|2|2|holder and balanced|Y
01|107245|3|1|HS Coolant Nut installed|Y
01|107245|4|1|Coolant back-up screw and coolant tube installed|Y
01|107245|7|1|customer providing balluf chip to be installed on|Y
01|107245|7|2|holder and balanced|Y
01|107245|8|1|High-speed coolant nut installed|Y
01|107245|9|1|Coolant back-up screw and coolant tube installed|Y
01|107245|13|1|customer providing balluf chip to be balanced and|Y
01|107245|13|2|installed|Y
01|107245|14|1|HS coolant nut installed|Y
01|107245|15|1|Back-up screw and coolant tube installed|Y
01|107250|1|1|Tooling Certificate Number: 9609-2190-010319|Y
01|107250|14|1|*Only available in 3.94 with Coolant Ports|Y
01|107258|1|1|Reference RGA# LVR-52953|Y
01|107258|1|2|Repair of customer's NK103-13000 s/n: AL012|Y
01|107258|1|3|(Alps# NK103-13002)|Y
01|107258|2|1|Bearings Seals O-rings and Collet Nut to be replaced|Y
01|107258|2|2|Sending in for evaluation. Verbally quoted $200.00|Y
01|107258|2|3|inspection fee.|Y
01|107278|1|1|HFO to supply Motors and cable set to Lyndex Nikken to|Y
01|107278|1|2|install|Y
01|107278|3|1|COLLET CHUCK PROMO KIT|Y
01|107278|3|2|NO CHARGE|Y
01|107295|5|1|Lyndex-Nikken to make position block for|Y
01|107295|5|2|Hyundai-Kia KV25 upon receipt of spindle drawing|Y
01|107295|5|3|*Net price|Y
01|107305|1|1|B/O until mid February|Y
01|107318|3|1|Lyndex-Nikken to make position block upon receipt|Y
01|107318|3|2|of spindle drawing information|Y
01|107318|3|3|*Net price|Y
01|107318|5|1|ref. 121569|Y
01|107318|6|1|ref. 121569|Y
01|107318|8|1|ref. 121549|Y
01|107318|9|1|ref. 121549|Y
01|107318|12|1|ref. 181627|Y
01|107318|13|1|ref. 181627|Y
01|107337|1|1|**Allow 1-2 weeks for approval drawing process.**|Y
01|107337|1|2|Delivery 10-12 Weeks upon receipt of your PO AND|Y
01|107337|1|3|after final clarification/ approval drawings have been|Y
01|107337|1|4|received.|Y
01|107367|1|1|Reference RGA# TAR-53005|Y
01|107367|1|2|CNCZ105LSA-BR s/n: 2147|Y
01|107367|1|3|Table has excessive backlash.|Y
01|107368|1|1|ref. mfg part# 192351|Y
01|107368|3|1|ref. mfg part# 192351|Y
01|107368|5|1|ref. mfg part# 192351|Y
01|107373|1|1|*ext coolant|Y
01|107373|2|1|*ext coolant|Y
01|107396|2|1|Installation includes: drive unit short bar fiber|Y
01|107396|2|2|optic cables communication cables bulk head cable|Y
01|107396|2|3|set external cable set parameter changes service|Y
01|107396|2|4|time and travel|Y
01|107418|4|1|1 STOCK  4 pieces  1-2wks  1 piece ship 8wks|Y
01|107439|3|1|We do not have a CP version|Y
01|107440|3|1|Offered as in stock alternative to 2.36|Y
01|107444|1|1|DELIVERY 2 WEEKS UPON RECEIPT OF ORDER FROM MAX TOOL|Y
01|107448|1|1|C8-MMC8C-TBD Capto C4 Mini-Mini Chuck Coolant|Y
01|107453|1|1|Non standard stock special item - 12mm Hydraulic Holder|Y
01|107453|1|2|Lead time approx. 16-18 weeks from drawing approval|Y
01|107453|1|3|Price to be determined|Y
01|107453|2|1|Non standard stock item|Y
01|107457|4|1|C8 Presetter Master Gauge|Y
01|107457|5|1|C8 Toolholding Fixture|Y
01|107484|1|1|Reference RGA# TAR-53015|Y
01|107484|1|2|CNC180FA-M s/n: 12234|Y
01|107484|1|3|Sending in for evaluation.|Y
01|107484|28|1|5C-AIR-FIXTURE-DL-CYL: Replacement cylinder|Y
01|107488|14|1|This item is a non standard stock item and is|Y
01|107488|14|2|considered special once an order is placed it|Y
01|107488|14|3|cannot be cancelled or returned.|Y
01|107488|14|4|e|N
01|107511|6|1|Specific customer requested upgrades. Per the email|Y
01|107511|6|2|provided by Melvin.|Y
01|107514|5|1|CONNECT TWO E46L PRESETTERS TO A NETWORK WITH SOFTWARE|Y
01|107514|5|2|REMOTELY NEWORKED TO 1 EXTERNAL PC. FUNCTIONS INCLUDE:|Y
01|107514|5|3|1) ABILITY TO SCAN QR CODE TO IDENTIFY THE TOOL.|Y
01|107514|5|4|2) PASSWORD PROTECTED ACCESS TO TOOL MEASUREMENT.|Y
01|107514|5|5|3) INCLUDES 1 COMMON DATABASE WITH SHARED INFORMATION.|Y
01|107514|5|6|4) RECORD TOOL MEASUREMENT OPERATOR DATE TIME AND X|Y
01|107514|5|7|Y & Z VALUES AND NOTES.|Y
01|107514|5|8|5) INCLUDES ONE 2D READER FOR EACH PRESETTER.|Y
01|107514|5|9|PLEASE NOTE PRICES ARE BASED ON THE PURCHASE OF 2|Y
01|107514|5|10|PRESETTERS.|Y
01|107514|6|1|Specific customer requested upgrades. Per the email|Y
01|107514|6|2|provided by Melvin.|Y
01|107516|1|1|Tooling Certificate #13485-2189-010219|Y
01|107525|4|1|5AX-201MA-M-AHB|Y
01|107525|6|1|Includes Installation Drive Units Bulkhead Cables|Y
01|107525|6|2|External Cables Service Time & Travel.|Y
01|107540|2|1|C5036-0375A-8.00|Y
01|107540|2|2|Special CAT50 3/8 Aerospace End Mill Holder w 8.00 gl|Y
01|107551|1|1|Reference RGA# TAR-52575|Y
01|107551|1|2|CNC260TSA-M s/n: 1066 Sent in for evaluation.|Y
01|107553|2|1|****HEAVY DUTY Drill Chuck*****|Y
01|107561|8|1|NCAT40-SF16-80CP|Y
01|107561|8|2|2LK TaperPlus NCAT40 16mm Shrink Fit Holder with|Y
01|107561|8|3|Coolant Ports|Y
01|107564|1|1|includes: 1600MM face plate table with Nikken control|Y
01|107564|1|2|with pendant external cables power cables and M-code|Y
01|107564|1|3|cable.|Y
01|107564|1|4|Installation not included.|Y
01|107565|1|1|Reference RGA# TOR-52997|Y
01|107565|1|2|HSK100A-C3/4-115G Nut is falling off.|Y
01|107610|11|1|**NET PRICE|Y
01|107614|1|1|Reference RGA# TOR-52988|Y
01|107614|1|2|PF-2 Sending in for evaluation.|Y
01|107614|1|3|Needs to be calibrated.|Y
01|107614|3|1|PF-2 Sending in for evaluation.|Y
01|107614|3|2|Needs to be calibrated.|Y
01|107614|5|1|PF-2 Sending in for evaluation.|Y
01|107614|5|2|Needs to be calibrated.|Y
01|107614|8|1|Calibration services are included.|Y
01|107615|4|1|1 adapter sleeve for above boring holder|Y
01|107615|5|1|10mm adapter sleeve for above boring holder|Y
01|107615|6|1|13mm adapter sleeve for above boring holder|Y
01|107615|7|1|19mm adapter sleeve for above boring holder|Y
01|107615|8|1|25mm adapter sleeve for above boring holder|Y
01|107615|9|1|32mm adapter sleeve for above boring holder|Y
01|107621|3|1|HYDRAULIC BRAKING ONLY ON THIS TABLE|Y
01|107621|7|1|4TH/5TH AXIS POWER/FEEDBACK CABLES|Y
01|107621|9|1|INCLUDES TRAVEL/LODGING FOR LN SERVICE TECH 4TH/5TH|Y
01|107621|9|2|AXIS SERVO AMPLIFIERS BULKHEAD CONNECTORS/WIRING|Y
01|107630|1|1|Inspection Fee - Evaluation of Rotary Table|Y
01|107630|2|1|Budgetary Number to do Brake Repair + PM + Labor|Y
01|107637|1|1|Reference RGA# TOR-53039|Y
01|107637|1|2|PF-2 Sending in for evaluation.|Y
01|107656|1|1|Reference RGA# TAR-52961|Y
01|107656|1|2|CNCZ180 s/n: 10734|N
01|107668|1|1|Wants modified for coolant thru|Y
01|107670|1|1|Includes 180mm Rotary Table w/ Nikken Controller|Y
01|107670|1|2|Pendant Power Cable MCode Cable|Y
01|107709|1|1|HSK63A Hydraulic Chuck 20mm bore 160mm gage length|Y
01|107709|2|1|HSK50A Hydraulic Chuck 20mm bore 160mm gage length|Y
01|107716|1|1|Reference RGA# LVR-52994|Y
01|107716|1|2|Repair of MZQT47-ER32Z-MS s/n: 91594 01|Y
01|107716|1|3|(Mimatic# 124638)|Y
01|107716|2|1|Bearings seals and o-rings to be replaced.|Y
01|107731|1|1|Reference RGA# LVR-52917|Y
01|107731|1|2|Repair of MZQT46-ER25Z-MS s/n: 51134 03|Y
01|107731|1|3|(Mimatic# 124649)|Y
01|107731|2|1|Bearings seals and o-rings to be replaced along with|Y
01|107731|2|2|replacing broken input spindle.|Y
01|107750|1|1|Must complete questionnaire prior to order confimation|Y
01|107750|2|1|1 position block is required per machine|Y
01|107752|1|1|Reference RGA# LVR-53078|Y
01|107752|1|2|Repair of 123862 s/n:65302 01|Y
01|107752|1|3|(Mimatic# 123862)|Y
01|107752|2|1|Bearings seals and o-rings to be replaced.|Y
01|107762|2|1|Cable Set up to 10ft|Y
01|107768|1|1|TC# 13687-2042-070618|Y
01|107772|1|1|H63A-SF0187-6.30|Y
01|107772|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|107784|1|1|This is the shortest length we can add the coolant|Y
01|107784|1|2|ports to|Y
01|107788|2|1|CAT40 MI50 AGH;A=65mm; d=18mm;1:1 Gearmax M=70Nm|Y
01|107788|2|2|6500RPM;Input reversal of output;4x90deg position pin;|Y
01|107788|2|3|ref drwg# 00042825|Y
01|107788|2|4|Delivery: 6 Weeks if order is placed no later then|Y
01|107788|2|5|Feb 7th.|Y
01|107788|2|6|Delivery is based upon receipt of purchase order and|Y
01|107788|2|7|signed drawing. This item is special once a purchase|Y
01|107788|2|8|order is placed it cannot be cancelled or returned.|Y
01|107794|4|1|This fan is being supplied as an extra per JoeC|Y
01|107795|3|1|Covers BT40 and CAT40|Y
01|107795|5|1|Covers BT50 and CAT50|Y
01|107795|6|1|Covers HSK63 Taper|Y
01|107798|1|1|Reference RGA# TAR-53026|Y
01|107798|1|2|CNCZ180 s/n: 20093T Brake is weak|Y
01|107806|2|1|Full set of cables for 4th/5th Rotary Table|Y
01|107807|2|1|Full set of cables for 4th/5th Rotary Table|Y
01|107808|1|2|Spare table is for Snap-On Murphy NC|Y
01|107811|5|1|NET COST TO ITS; BLOCK WILL BE MACHINED BY LN TO|Y
01|107811|5|2|TOSHIBA SPINDLE SPECIFICATIONS.|Y
01|107814|1|1|HSK125A Face Mill Holder 2.0 Pilot X 6.0 Gage Length|Y
01|107814|1|2|with 3.0 Bolt Dia.per drawing 602555-Rev B|Y
01|107814|1|3|Balluff Chip BIS004A installed. Laser mark tools with|Y
01|107814|1|4|customers part number and lable packaging with same|Y
01|107814|1|5|number. Key to be supplied by Greenleaf (contact us|Y
01|107814|1|6|for RGA number) and installed by Lyndex-Nikken.|Y
01|107814|1|7|Net price reflects purchase order of 2 holders.|Y
01|107814|3|1|HSK125A Face Mill Holder 2.0 Pilot X 6.0 Gage Length|Y
01|107814|3|2|with 3.0 Bolt Dia.per drawing 602555-Rev B|Y
01|107814|3|3|Balluff Chip BIS004A installed. Laser mark tools with|Y
01|107814|3|4|customers part number and lable packaging with same|Y
01|107814|3|5|number. Key to be supplied by Greenleaf (contact us|Y
01|107814|3|6|for RGA number) and installed by Lyndex-Nikken.|Y
01|107814|3|7|Net price reflects purchase order of 5~9 holders.|Y
01|107814|5|1|HSK125A Face Mill Holder 2.0 Pilot X 6.0 Gage Length|Y
01|107814|5|2|with 3.0 Bolt Dia.per drawing 602555-Rev B|Y
01|107814|5|3|Balluff Chip BIS004A installed.Laser mark tools with|Y
01|107814|5|4|customers part number and lable packaging with same|Y
01|107814|5|5|number. Key to be supplied by Greenleaf (contact us|Y
01|107814|5|6|for RGA number) and installed by Lyndex-Nikken.|Y
01|107814|5|7|Net price reflects purchase order of 10+ holders.|Y
01|107827|1|1|Pre-E68B-I50-1000 E68B with CAT50 Spindle-1000mm height|Y
01|107827|2|1|PRE-SPDL-I40G CAT40 Spindle Holder w/Mechanic Tool|Y
01|107827|2|2|Clamping.|Y
01|107827|3|1|PRE-SPDL-HSK100-E68  HSK100 Spindle|Y
01|107827|8|1|8 HOUR DAY OF INSTALLATION AND TRAINING|Y
01|107831|1|1|SK25-25.4AC|Y
01|107831|1|2|10 PC MinimumQuoted as NET pricing non-returnable|Y
01|107831|1|3|non-cancelable|Y
01|107839|1|1|S32-SK16X-300|Y
01|107839|1|2|Straight Shank Carbide Type Slim Chuck|Y
01|107839|2|1|S32-SK16-300|Y
01|107839|2|2|Straight Shank Slim Chuck|Y
01|107849|1|1|Tooling Certificate Number: 13435-1138-030818|Y
01|107849|14|1|*confirm ID size required|Y
01|107849|23|1|**Needed per holder|Y
01|107849|26|1|**COST is UP**|Y
01|107884|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|107893|1|1|Inspected by Tim R.good to sell as isslight marks|Y
01|107924|1|1|Replacement Soft Jaws for R-10-SP-SET|Y
01|107924|1|2|Part # SO09|Y
01|107929|1|1|Reference RGA# TAR-53107|Y
01|107929|1|2|5AXZ-350FA-RCN2-RJ6 s/n: 3693 Brake issue and/or|Y
01|107929|1|3|excessive backlash.|Y
01|107929|51|1|Expedite fee to have tilt axis repaired and ready|Y
01|107929|51|2|to ship in 2-3 business days from receipt of approval|Y
01|107929|51|3|to proceed.|Y
01|107958|2|1|** MT#3 sockets **|Y
01|107958|8|1|Qty of (2) for installation|Y
01|107958|8|2|Qty of (1) shown above for rotary table package|Y
01|107959|9|1|INSTALLATION INCLUDES LABOR TRAVEL DRIVES(DUAL)|Y
01|107959|9|2|EXTERNAL CABLES CONNECTORS FIBERR OPTICS|Y
01|107961|1|1|*Qty Break: 1-9pcs|Y
01|107961|2|1|*Qty Break: 10-19pcs|Y
01|107961|3|1|*Qty Break: 20-29pcs|Y
01|107961|7|1|*Qty Break: 1-9pcs|Y
01|107961|8|1|*Qty Break: 10-19pcs|Y
01|107961|9|1|*Qty Break: 20-29pcs|Y
01|107961|13|1|*Qty Break: 1-9pcs|Y
01|107961|14|1|*Qty Break: 10-19pcs|Y
01|107961|15|1|*Qty Break: 20-29pcs|Y
01|107961|19|1|*Qty Break: 1-9pcs|Y
01|107961|20|1|*Qty Break: 10-19pcs|Y
01|107961|21|1|*Qty Break: 20-29pcs|Y
01|107961|25|1|*wrench for HSK100A SK16 Collet Chucks|Y
01|107961|26|1|*wrench for HSK100A SK10 Collet Chucks|Y
01|107961|27|1|*wrench for HSK100A SK25 Collet Chucks|Y
01|107962|1|1|SV-85|Y
01|107973|2|1|Installation includes: drive unit short bar fiber|Y
01|107973|2|2|optic cables communication cables bulk head cable|Y
01|107973|2|3|set external cable set parameter changes service|Y
01|107973|2|4|time and travel|Y
01|107982|9|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|107982|10|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|107988|1|1|ref. Mori# T00184|Y
01|107990|15|1|To Hold 7/8's|Y
01|108006|1|1|PHILLIPS TO SUPPLY MOTOR AND CABLES FOR LYNDEX NIKKEN|Y
01|108006|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|108006|1|3|CONFIRMATION OF PROPER FIT TO MACHINE MUST BE VERIFIED|Y
01|108009|1|1|One-time Core trade-in discount|Y
01|108011|11|1|STANDARD AZIMUTH CERTIFICATE INCLUDED NO CHARGE|Y
01|108012|6|1|Quoted at Net Price|Y
01|108018|1|1|CAT50 ER25 Angle Head Flex 110mm Pitch Tapered Pin:|Y
01|108018|1|2|1:2.25 Gear ratio; n1=6000 RPM ; n2=13500 RPM|Y
01|108018|1|3|max torque M= 30Nm|Y
01|108018|1|4|Center coolant through spindle; max 1015PSI|Y
01|108018|1|5|Input is not reversal to output;|Y
01|108018|1|6|Ref Drwg# 00055098|Y
01|108018|3|1|CAT50 ER25 Angle Head Flex 110mm Pitch Tapered Pin:|Y
01|108018|3|2|1:2.25 Gear ratio; n1=6000 RPM ; n2=13500 RPM|Y
01|108018|3|3|max torque M= 30Nm|Y
01|108018|3|4|Center coolant through spindle; max 1015PSI|Y
01|108018|3|5|Input is not reversal to output;|Y
01|108018|3|6|Ref Drwg# 00055098|Y
01|108022|1|1|HOWA# H023M15 Z-185 1.5mm Master Jaws|Y
01|108023|3|1|Part #PRE-Guage-C6|Y
01|108055|1|1|CAT40-Q20-80U|Y
01|108055|1|2|Base Holder for Modular Type|Y
01|108076|16|1|Retention Knob Promo per holder=knob @ $5.00 ea|Y
01|108084|12|1|1 pull stud at $5 each per holder ordered.Must order|Y
01|108084|12|2|the studs at same time as holders|Y
01|108087|2|1|2 sets of Rotary Table Cables.|Y
01|108094|3|1|DEMO TABLE CONVERTED TO USE ON HAAS|Y
01|108094|7|1|This was incorrectly shipped to STS. Not returned yet|Y
01|108094|9|1|EXTERNAL CABLE SET FOR ADDITIONAL AXIS|Y
01|108106|1|1|HSK125A-C1.1/2-135 Milling Chuck|Y
01|108106|1|2|Quoted net price 1~9 holders.|Y
01|108106|2|1|HSK125A-C1.1/2-135 Milling Chuck|Y
01|108106|2|2|Quoted net price 10~19 holders.|Y
01|108106|4|1|HSK125A-C1.1/2-135-SL  Side Lock Milling Chuck|Y
01|108106|4|2|Quoted net price 1~9 holders.|Y
01|108106|5|1|HSK125A-C1.1/2-135-SL  Side Lock Milling Chuck|Y
01|108106|5|2|Quoted net price 10~19 holders.|Y
01|108106|7|1|HSK125A-C1.1/2-135-SLG Milling chuck with 5 degree side|Y
01|108106|7|2|lock.|Y
01|108106|7|3|Quoted net price 1~9 holders.|Y
01|108106|8|1|HSK125A-C1.1/2-135-SLG Milling chuck with 5 degree side|Y
01|108106|8|2|lock.|Y
01|108106|8|3|Quoted net price 10~19 holders.|Y
01|108106|10|1|HSK125A-C2-135  2 Milling Chuck|Y
01|108106|10|2|Quoted net price 1~9 holders.|Y
01|108106|11|1|HSK125A-C2-135  2 Milling Chuck|Y
01|108106|11|2|Quoted net price 10~19 holders.|Y
01|108106|14|1|HSK125A-C2-135-SL  HSK125A C2  Milling chuck with side|Y
01|108106|14|2|lock.|Y
01|108106|14|3|Quoted net price 1~9 holders.|Y
01|108106|15|1|HSK125A-C2-135-SL  HSK125A C2  Milling chuck with side|Y
01|108106|15|2|lock.|Y
01|108106|15|3|Quoted net price 10~19 holders.|Y
01|108106|17|1|HSK125A-C2-135-SLG Milling chuck with 5 degree side|Y
01|108106|17|2|lock.|Y
01|108106|17|3|Quoted net price 1~9 holders.|Y
01|108106|18|1|HSK125A-C2-135-SLG Milling chuck with 5 degree side|Y
01|108106|18|2|lock.|Y
01|108106|18|3|Quoted net price 10~19 holders.|Y
01|108119|8|1|Old style: Pre-balanced and Balanceable|Y
01|108122|5|1|Lyndex Nikken to make Positioning Block upon Receipt of|Y
01|108122|5|2|Spindle Drawing|Y
01|108127|2|1|Installation inlcudes: Drive unit short bar fiber|Y
01|108127|2|2|optic cable communications cable bulkhead cables|Y
01|108127|2|3|external cables parameter changes service time and|Y
01|108127|2|4|travel.|Y
01|108142|1|1|HSK80F-SM0750-8.00|Y
01|108142|1|2|HSK80F Taper 3/4 Shell Mill Holder w 8.00 gage length|Y
01|108151|1|1|534-022|Y
01|108151|2|1|534-024|Y
01|108151|3|1|534-026|Y
01|108151|4|1|534-030|Y
01|108151|5|1|**Confirm Sowa part# 534-035. Should it be #534-034?|Y
01|108151|5|2|NMTB50 3/4 EMH w/ 2.88 gl|Y
01|108151|7|1|534-042|Y
01|108151|8|1|534-046|Y
01|108151|11|1|534-478|Y
01|108151|12|1|534-480|Y
01|108151|13|1|334-565|Y
01|108151|14|1|334-561|Y
01|108160|1|1|C60-EM20-65 Capto C6 20mm End Mill Holder|Y
01|108160|1|2|Minimum Order 10 holders.|Y
01|108160|1|3|Net price quoted.|Y
01|108160|2|1|C60-EM25-80 Capto C6 25mm End Mill Holder|Y
01|108160|2|2|Minimum Order 10 holders.|Y
01|108160|2|3|Net price quoted.|Y
01|108166|1|1|CNC202LFA-M-AW1|Y
01|108166|1|2|RJ6+1|Y
01|108166|1|3|Power cable & Feeback cable included|Y
01|108166|1|4|Special items no cancelation no refund upon PO|Y
01|108166|1|5|Int'l delivery is based on ocean transportaion|Y
01|108166|1|6|US domestic truck freight will be added on delivery|Y
01|108168|6|1|NEED UPDATED PRICING|Y
01|108171|1|1|Special Rotary Table Horizontal Use With Scale and Rise|Y
01|108171|1|2|Special Modification Cost Included.|Y
01|108171|1|3|1-5 Units Purchase Price.|Y
01|108171|2|1|6+1 Rotary Joint|Y
01|108171|2|2|1-5 Units Purchase Price|Y
01|108171|3|1|Special Rotary Table Horizontal Use With Scale and Rise|Y
01|108171|3|2|Special Modification Cost Included.|Y
01|108171|3|3|6-10 Units Purchase Price.|Y
01|108171|4|1|6+1 Rotary Joint|Y
01|108171|4|2|6-10 Units Purchase Price|Y
01|108171|7|1|PLC   1 Unit Purchase Price|Y
01|108171|8|1|PLC 2-3 Units Purchase Price|Y
01|108171|9|1|PLC 4-5 Units Purchase Price|Y
01|108171|10|1|PLC 6-9 Units Purchase Price|Y
01|108171|11|1|PLC 10 or more Units Purchase Price|Y
01|108173|1|1|Tooling Certificate Number: 9609-2190-010319|Y
01|108173|14|1|*Only available in 3.94 with Coolant Ports|Y
01|108184|2|1|Internal & External Coolant can also be run Dry|Y
01|108188|18|1|NET PRICING ON PULL STUDS|Y
01|108192|12|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|108192|12|2|External Cables Service Time & Travel - Hyundai KF5600|Y
01|108209|8|1|Ret knob Promo- Qty to match Tapered Holders|Y
01|108214|1|1|Tooling Certificate Number: 20880-2152-110718|Y
01|108220|1|1|Reference RGA# TOR-53058|Y
01|108220|1|2|HP-100 Unit needs a new dial face bezel and/or a new|Y
01|108220|1|3|dial gauge assembly.|Y
01|108228|3|1|SHELL MILL MODIFIED FOR COOLANT THROUGH PILOT|Y
01|108228|3|2|MODIFICATION IS FOR C5001-1000-1.75|Y
01|108228|3|3|COST IS NET TO CARBIDE AND SUPPLY|Y
01|108235|1|1|This is a non standard stock special and will be|Y
01|108235|1|2|NON CANCELABLE and NON RETURNABLE once order is placed|Y
01|108235|1|3|Price is NET price|Y
01|108235|2|1|This item is a non standard stock special item and is|Y
01|108235|2|2|NON CANCELABLE and NON RETURNABLE once order is placed|Y
01|108235|2|3|Price is NET price|Y
01|108237|6|1|Sub for H63A-SF0750-3.94|Y
01|108253|1|1|Holds 1.5060|Y
01|108253|1|2|Range: 1.469-1.531|Y
01|108253|2|1|Holds 1.3860 and 1.3815|Y
01|108253|2|2|Range: 1.344-1.406|Y
01|108270|1|1|DIRECT REPLACEMENT FOR A21CONTROL AND MOTOR|Y
01|108270|1|2|NO MOTOR OR CONTROLLER|Y
01|108282|1|1|A21 CONTROLLER AND TABLE MOTOR WILL BE RE-USED|Y
01|108282|1|2|NO MOTOR OR CONTROLLER INCLUDED IN THIS QUOTATION|Y
01|108299|3|1|WAREHOUSE 2 HOLDER - NO ID CHIP HOLE|Y
01|108320|6|1|16 3 JAW STEEL BODY CHUCK PACKAGE.|Y
01|108320|6|2|PACAKGE INCLUDES 16 3 JAW SET TRU CHUCK 2 PC JAWS|Y
01|108320|6|3|FINISHED ADAPTER PLATE T-NUTS MOUNTING BOLTS AND|Y
01|108320|6|4|ASSEMBLY DRAWING. CHUCK THROUGH HOLE 5.3543 DIA|Y
01|108320|7|1|PRICE IS NET TO ELLISON|Y
01|108320|7|2|PRICE INCLUDES SERVO AMP AND ALL NECESSARY MISC ITEMS|Y
01|108320|7|3|FOR PROFESSIONAL INSTALLATION.|Y
01|108321|1|1|RT PN AS A PLACE HOLDER FOR QUOTING PURPOSES|Y
01|108321|1|2|ACUTAL PN NEEDED IS CNC501HA-M|Y
01|108321|2|1|I'LL CHECK ON AVAILABILITY WHEN OFFICES OPEN TOMORROW|Y
01|108321|5|1|NEED TO CONFIRM IF MACHINE REQUIRES AC OR DC|Y
01|108321|6|1|16 3 JAW STEEL BODY CHUCK PACKAGE|Y
01|108321|6|2|PACAKGE INCLUDES 16 3 JAW SET TRU CHUCK 2 PC JAWS|Y
01|108321|6|3|FINISHED ADAPTER PLATE T-NUTS MOUNTING BOLTS AND|Y
01|108321|6|4|ASSEMBLY DRAWING. CHUCK THROUGH HOLE 5.3543 DIA|Y
01|108321|7|1|COST IS NET TO ELLISON TECHNOLOGIES|Y
01|108321|7|2|COST INCLUDES SERVO AMP AND ALL MISC ITEMS FOR|Y
01|108321|7|3|PROFESSIONAL INSTALL.|Y
01|108353|2|1|DISCONTINUED NOT AVAILABLE AFTER STOCK IS DEPLETD|Y
01|108353|2|2|DOES NOT HAVE RED LIGHT|Y
01|108353|3|1|HAS INDICATOR IN .001 GRADUATIONS|Y
01|108353|3|2|RED VISUAL INDICATOR|Y
01|108353|3|3|MAGNETIC BASE|Y
01|108354|3|1|Please Note: Retention knob can be taken at $5.00 net|Y
01|108354|3|2|with the purchase of a matching taper holder. List|Y
01|108354|3|3|price is $27.90 less 35%.|Y
01|108373|1|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|108373|2|1|Quoted as NET pricing Non-returnable Non-cancelable|Y
01|108373|4|1|FREIGHT NOT INCLUDED|Y
01|108385|1|1|Reference RGA# TAR-52998|Y
01|108385|1|2|TAT-200 s/n: 2264|N
01|108388|1|1|Reference RGA# QUA-53105|Y
01|108388|1|2|5AX-2002 s/n: 2500|Y
01|108388|1|3|Warranty repair|Y
01|108388|3|1|Table repaired under warranty|Y
01|108389|8|1|Threading Fee|Y
01|108396|2|1|Quoted as NET pricingETA 1 WK after disign complettion|Y
01|108399|1|1|ref. Howa part# H037M8|Y
01|108408|9|1|INSTALLATION INCLUDES LABOR TRAVEL DRIVES(DUAL)|Y
01|108408|9|2|EXTERNAL CABLES CONNECTORS FIBERR OPTICS|Y
01|108438|1|1|One M code is required for table/controller setup|Y
01|108438|1|2|Weight of table - 80 to 90 lbs|Y
01|108446|1|1|Includes Haas Motors and Cables|Y
01|108446|2|1|Complimentary Tooling Certificate w/5AX Table Purchase|Y
01|108448|1|1|Includes Haas Motors and Cables|Y
01|108448|2|1|Complimentary Tooling Certificate w/5AX Table Purchase|Y
01|108478|1|1|Special-Non-returnable.|Y
01|108481|1|1|5AX-350FA-M-RJ6|Y
01|108481|1|2|TILT TABLE 350mm Fanuc|Y
01|108481|1|3|W/special Face Plat6P R/Joint Std Base and Motor|Y
01|108481|1|4|Special Order itemnot cancellable after PO|Y
01|108481|1|5|Special Order itmenot returnable after PO|Y
01|108481|2|1|5AX-350FA-RJ6|Y
01|108481|2|2|TILT TABLE 350mm Fanuc|Y
01|108481|2|3|Without motor|Y
01|108481|2|4|W/Special Face Plat 6P R/JointStd.Base|Y
01|108481|2|5|Special Order item not cancellable after PO|Y
01|108481|2|6|Special Order item not returnable after PO|Y
01|108487|1|1|Includes: 200MM tilt rotary table with Okuma OSP3|Y
01|108487|1|2|motors BL-ME24J-50SN with pneumatic brake system.|Y
01|108489|7|1|*(non-returnable/non-cancellable)|Y
01|108495|3|1|Installation includes: drive unit short bar fiber|Y
01|108495|3|2|optic cables communication cables bulk head cable|Y
01|108495|3|3|set external cable set parameter changes service|Y
01|108495|3|4|time and travel|Y
01|108496|3|1|Installation includes: drive unit short bar fiber|Y
01|108496|3|2|optic cables communication cables bulk head cable|Y
01|108496|3|3|set external cable set parameter changes service|Y
01|108496|3|4|time and travel|Y
01|108535|21|1|e|N
01|108548|5|1|Balance ETA 17-18 Weeks|Y
01|108556|1|1|CAT50 2-1/4 End Millshortest GL available|Y
01|108556|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|108556|1|3|C5006-2250-4.50|Y
01|108556|2|1|CAT50 2-1/4 End Millshortest GL available|Y
01|108556|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|108556|2|3|C5006-2250A-4.50 (AEROSPACE)|Y
01|108558|1|1|Reference RGA# LVR-53108|Y
01|108558|1|2|Mazak Part# 53178000300|Y
01|108558|1|3|Tool is locked up.|Y
01|108558|2|1|Resurface spindle & replace all bearings seals &|Y
01|108558|2|2|o-rings.  Labor is included.|Y
01|108559|1|1|Reference RGA# LVR-53098|Y
01|108559|1|2|MZQT47-ER16-AD-HS s/n: 2919402 (Mim# 125054)|Y
01|108559|2|1|Replace bearings seals & o-rings.|Y
01|108559|2|2|Labor is included.|Y
01|108578|1|1|Reference RGA# TAR-53052|Y
01|108578|1|2|CNCZ180 s/n: 12000 Sending table in for evaluation.|Y
01|108589|11|1|Quoted at promo price-1 knob/holder at $5.00|Y
01|108589|11|2|list price $25.90|Y
01|108598|1|1|Reference RGA# TAR-52964|Y
01|108598|1|2|5AX-130FA-M s/n: 5560|N
01|108641|4|1|Power/Feedback Cables for 4th/5th Axis|Y
01|108643|1|1|Net Price Each.|Y
01|108645|1|1|QUOTE DOES NOT INCLUDE MOTOR; WILL RESUBMIT WHEN|Y
01|108645|1|2|MOTOR INFORMATION IS ACQUIRED FROM ENGINEERING DEPT.|Y
01|108645|2|1|QUOTE DOES NOT INCLUDE MOTOR; WILL RESUBMIT WHEN|Y
01|108645|2|2|MOTOR INFORMATION IS RECEIVED FROM ENGINEERING DEPT.|Y
01|108645|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|108645|4|2|INCLUDED AT NO COST TO MORRIS SOUTH|Y
01|108655|2|1|Installation includes: drive unit short bar fiber|Y
01|108655|2|2|optic cables communication cables bulk head cable|Y
01|108655|2|3|set external cable set parameter changes service|Y
01|108655|2|4|time and travel|Y
01|108671|6|1|Our 1/8 holder does not come with Coolant Port.|Y
01|108671|6|2|CAT40-SF0125-3.15 (w/o coolant port)available|Y
01|108671|6|3|ETA for stock on CAT40-SF0125-3.15 is 2/22.|Y
01|108687|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|108687|6|1|$2000 TOOLING CERTIFICATE INCLUDED WITH PURCHASE|Y
01|108687|6|2|AT NO COST TO CUSTOMER|Y
01|108716|4|1|Stop Block for C40 machine TBD - Need Spindle info|Y
01|108716|4|2|when placing PO|Y
01|108753|1|1|PLC Program development & onsite trial fee by 1/9/2019|Y
01|108756|1|1|***10pc min***|Y
01|108756|4|1|HSK80F ER16 Collet Chuck w/ 3 GL Pre-balanced|Y
01|108756|4|2|Pre-balanced and Balanceable (Balanceable holes in|Y
01|108756|4|3|flange) G2.5 @ 18000RPM|Y
01|108756|4|4|Patriot Spec: No Manual Clamp Hole|Y
01|108756|4|5|With Coolant Tube Threads|Y
01|108756|7|1|***10pc min***|Y
01|108756|11|1|HSK80F ER16 Collet Chuck w/ 4.50 GL Pre-balanced|Y
01|108756|11|2|Pre-balanced and Balanceable (Balanceable holes in|Y
01|108756|11|3|flange) G2.5 @ 18000RPM|Y
01|108756|11|4|Patriot Spec: No Manual Clamp Hole|Y
01|108756|11|5|With Coolant Tube Threads|Y
01|108756|14|1|***10pc min***|Y
01|108786|1|1|Net Price Quoted|Y
01|108786|3|1|Net price quoted.|Y
01|108801|4|1|Installation includes: Drive unit short bar fiber|Y
01|108801|4|2|optic cable communications cables bulkhead cables|Y
01|108801|4|3|external cables parameter changes service time and|Y
01|108801|4|4|travel.|Y
01|108807|1|1|BMT65-ER11(X)-UT-SP|Y
01|108807|1|2|BMT65; ER11; X-axis; U-tool; L=81mm; L1=101mm;|Y
01|108807|1|3|External Coolant; 1:2 Gear ratio; Max torque M=10Nm;|Y
01|108807|1|4|n1=3750 RPM n2=7500 RPM; Reversed Direction of Rotate|Y
01|108807|2|1|BMT65-ER11(X)-UT-SP|Y
01|108807|2|2|SAME TOOL AND DESCRIPTION AS ABOVE DISCOUNTED FOR|Y
01|108807|2|3|ADDITIONAL QUANTITY|Y
01|108807|3|1|BMT65-ER11(X)-UT-SP|Y
01|108807|3|2|SAME TOOL AND DESCRIPTION AS ABOVE DISCOUNTED FOR|Y
01|108807|3|3|ADDITIONAL QUANTITY.|Y
01|108807|4|1|BMT65-ER11(X)-UT-SP|Y
01|108807|4|2|SAME TOOL AND DESCRIPTION AS ABOVE DISCOUNTED FOR|Y
01|108807|4|3|ADDITIONAL QUANTITY|Y
01|108807|5|1|BMT65-ER11(X)-UT-SP|Y
01|108807|5|2|SAME TOOL AND DESCRIPTION AS ABOVE DISCOUNTED FOR|Y
01|108807|5|3|ADDITIONAL QUANTITY|Y
01|108812|2|1|26-RAC70-70A RAC Boring Head|Y
01|108812|2|2|Quoted as net Pricing non-returnable non-cancelable|Y
01|108861|2|1|Offered as an in stock option.|Y
01|108866|1|1|Item is a non stock standard special and is quoted at|Y
01|108866|1|2|NET pricing.Also the order will be non cancelable nor|Y
01|108866|1|3|returnable once ordered.|Y
01|108866|1|4|Ref drawing 00036386|Y
01|108866|2|1|This item is a non standard stock special and is priced|Y
01|108866|2|2|at NET pricing. Also the order will be non cancelable|Y
01|108866|2|3|nor returnable once an order is placed|Y
01|108870|15|1|C6-SF0500-5.12CP|Y
01|108870|17|1|C6-SF1000-4.53CP|Y
01|108870|18|1|C8-SF0500-6.30CP|Y
01|108870|19|1|C8-SF0750-4.13CP|Y
01|108872|11|1|*special pricing offered at matching qty of CAT40|Y
01|108872|11|2|holders|Y
01|108882|7|1|1 set of 10 foot cables|Y
01|108906|1|1|Replacement for # HH960C115HE M478 R-Cylinder|Y
01|108910|3|1|WILL CONVERT MA TABLE TO FA 2-3 WEEK LEADTIME|Y
01|108910|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|108910|6|1|INCLUDES: 4TH AXIS DRIVE/MOTOR; BULKHEAD CABLING;|Y
01|108910|6|2|PARAMETER CHANGES REQUIRED FOR PROPER OPERATION;|Y
01|108910|6|3|& LYNDEX NIKKEN SERVICE TECH TRAVEL EXPENSES/LODGING|Y
01|108912|2|1|Length is 60mm|Y
01|108931|1|1|Reference RGA# TAR-52808|Y
01|108931|1|2|5AX-201 s/n: 5110 Rotary Axis not working.|Y
01|108939|4|1|LABOR ONLY INSTALLATION; PHILLIPS/TOYODA TO SUPPLY|Y
01|108939|4|2|WIRING FROM ELECTRICAL CABINET TO BULKHEAD PLUS|Y
01|108939|4|3|CONNECTORS FOR EXTERNAL CABLES FROM ROTARY TABLE|Y
01|108939|4|4|AS WELL AS HYDRAULIC BULKHEAD CONNECTOR|Y
01|108939|4|5|PHILLIPS/TOYODA WILL ALSO SUPPLY 4TH AXIS DRIVE|Y
01|108943|1|1|Reference RGA# TOR-53176|Y
01|108943|1|2|Repair of 2x HSK100A-NPU13C-145|Y
01|108944|5|1|$1000 tooling certs|Y
01|108947|1|1|B/O until mid April|Y
01|108947|2|1|In stock version avail in 50.8mm length|Y
01|108972|1|1|4pcs. ETA 6/5 next 4pcs. ETA 6/20 next ETA 7/05|Y
01|108972|2|1|4pcs. ETA 6/5 next 4pcs. ETA 6/20 next ETA 7/05|Y
01|108972|3|1|10ft. Cable Set|Y
01|108972|4|1|Install pricing is based on 4 at a time.|Y
01|109014|29|1|1pc stock ETA aprox 3/6/2019|Y
01|109017|1|1|Includes Haas Motors and Cable Set.|Y
01|109033|16|1|PRICES ARE BASED AN ORDER FOR THE ITEMS QUOTED ABOVE|Y
01|109033|16|2|IN THE QUANTIITES QUOTED ABOVE.  ANY CHANGE IN THE|Y
01|109033|16|3|ITEMS QUOTED MUST BE RE-QUOTED.|Y
01|109042|1|1|Pre-E68B-I50-1000 E68B with CAT50 Spindle-1000mm height|Y
01|109042|2|1|PRE-SPDL-I40G CAT40 Spindle Holder w/Mechanic Tool|Y
01|109042|2|2|Clamping.|Y
01|109042|3|1|PRE-SPDL-HSK100-E68  HSK100 Spindle|Y
01|109042|8|1|8 HOUR DAY OF INSTALLATION AND TRAINING|Y
01|109044|4|1|Positioning Block for machine spindle. Spindle needs to|Y
01|109044|4|2|to be defined before PO can be accepted. LN Engineering|Y
01|109044|4|3|needs to approve process.|Y
01|109064|1|1|Reference RGA# QUA-52812|Y
01|109064|1|2|Repair of 3 x MI50-TAP8|Y
01|109064|1|3|(Mimatic# 155455)|Y
01|109064|2|1|Repairing the worn out drive square on the quick change|Y
01|109064|2|2|tap collets.|Y
01|109070|2|1|EXTERNAL POWER/FEEDBACK CABLES 4TH/5TH AXIS|Y
01|109075|5|1|*105mm in TP/Dual contact well in stock|Y
01|109075|18|1|*Special price - Qty of knobs to match Qty of holders|Y
01|109075|20|1|**additional knobs|Y
01|109075|20|2|**pricing held for 50-60pcs on one order|Y
01|109102|18|1|Alternate part # for PS-1|Y
01|109102|19|1|Alternate part # for PS-O|Y
01|109119|1|1|On back order until Mid April|Y
01|109120|1|1|HSK63A RAH ER20 L=140mm L1=71mm 360 Deg ADJ 1:1 Gear|Y
01|109120|1|2|ratio Max M=10Nm 2000RPM No coolant reversal of|Y
01|109120|1|3|direction Weight apprx 3kg Ref drwg#00053973|Y
01|109120|1|4|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|109120|1|5|ETA 22 WKS Prending drawing approval|Y
01|109120|2|1|HSK63A RAH ER20 L=140mm L1=71mm 360 Deg ADJ 1:1 Gear|Y
01|109120|2|2|ratio Max M=10Nm 2000RPM No coolant reversal of|Y
01|109120|2|3|direction Weight apprx 3kg Ref drwg#00053973|Y
01|109120|2|4|Quoted as NET pricingNon-returnableNon-cancelable|Y
01|109120|2|5|ETA 23 WKS Pending drawing approval|Y
01|109120|2|6|2 PC pricing|Y
01|109122|1|1|93-pcs stock if I get purchase order today I can have|Y
01|109122|1|2|the balance of holders here next Monday the 11th or|Y
01|109122|1|3|Tuesday the 12th otherwise the delivery is 1~2 weeks.|Y
01|109122|14|1|Retention knob promo buy a BT30 holder and get the|Y
01|109122|14|2|matching taper knob for $5.00 net.|Y
01|109131|5|1|Item is a non standard stock special and is not|Y
01|109131|5|2|cancellable nor returnable once order is placed|Y
01|109131|6|1|Item is non standard stock special and is not|Y
01|109131|6|2|cancellable nor returnable once order is placed|Y
01|109131|7|1|Item is a non standard stock special and is not|Y
01|109131|7|2|cancellable nor returnable once an order is placed|Y
01|109131|8|1|Item is non standard stock special and is not|Y
01|109131|8|2|cancellable nor returnable once the order is placed|Y
01|109131|9|1|NET Pricingnon-returnablenon-cancelable|Y
01|109131|9|2|Pull stud PS-N46E to be installed in holder at the|Y
01|109131|9|3|factory. Price includes pull stud|Y
01|109131|9|4|Item is a special and is not cancelable or returnable|Y
01|109131|9|5|once the order is placed|Y
01|109131|10|1|Pull stud to be installed in the holder at the factory|Y
01|109131|11|1|Pull stud to be installed in the holder at the factory|Y
01|109131|11|2|Pull stud PS-N46E to be installed in holder at the|Y
01|109131|11|3|factory. Price includes pull stud|Y
01|109131|11|4|Item is a special and is not cancelable or returnable|Y
01|109131|11|5|once an order is placed|Y
01|109131|12|1|Pull stud to be installed in the holder at the factory|Y
01|109131|16|1|NET Pricingnon-returnablenon-cancelable|Y
01|109131|16|2|Pull stud PS-N46E to be installed in holder at the|Y
01|109131|16|3|factory. Price includes pull stud|Y
01|109131|16|4|Item is a special and is not cancelable or returnable|Y
01|109131|16|5|cancellable nor returnable once an order is placed|Y
01|109131|17|1|Pull stud to be installed in the holder at the factory|Y
01|109131|18|1|NET Pricingnon-returnablenon-cancelable|Y
01|109131|18|2|Pull stud PS-N46E to be installed in holder at the|Y
01|109131|18|3|factory. Price includes pull stud|Y
01|109131|18|4|Item is a special and is not cancelable or returnable|Y
01|109131|19|1|Pull stud to be installed in the holder at the factory|Y
01|109131|25|1|Item is a non standard stock special and is not|Y
01|109131|25|2|cancellable nor returnable once order is placed|Y
01|109137|1|1|C1TA190 H-490  SPECIAL|Y
01|109137|1|2|Howa Cylinder to replace (HH36C12)|Y
01|109140|1|1|HFO Tampa to supply correct motors|Y
01|109140|1|2|HFO Tampa to supply cables|Y
01|109142|3|1|High Speed four spindle table with Nikken Alpha 21|Y
01|109142|3|2|control.|Y
01|109142|5|1|CORRECT p/n IS CNCZ-100-3W-120AA21-400W|Y
01|109142|9|1|NEED A FIXTURE FOR EACH SPINDLE|Y
01|109146|1|1|Reference RGA# TAR-53158|Y
01|109146|1|2|5AX-2MT-105-120SA-BR2 s/n: 8244|N
01|109148|1|1|CAT45-SF1000-8.00CP|Y
01|109148|2|1|CAT45-SF1000-6.00CP|Y
01|109148|3|1|CAT45-SF1000-4.00CP|Y
01|109148|4|1|CAT45-SF0750-6.00CP|Y
01|109148|5|1|CAT45-SF0625-6.00CP|Y
01|109164|1|1|C1TA-165-H493 (not built in NERP yet).|Y
01|109164|1|2|Howa#: C1TA165 H-493 (HH36C10 Replacement)|Y
01|109164|1|3|Cylinder mounting is compatible. Housing & Coolant|Y
01|109164|1|4|Collector dimensions vary|Y
01|109185|4|1|***1pc ETA 1-2 Weeks Balance 14-15 Wks.***|Y
01|109185|6|1|***1pc ETA 1-2 Weeks Balance 14-15 Wks.***|Y
01|109185|14|1|***1pc ETA 1-2 Weeks Balance 14-15 Wks.***|Y
01|109186|1|1|PRICE AND DELIVERY TBA|Y
01|109196|1|1|HH90150 Y-2311-10 (Seal Kit)|Y
01|109196|1|2|Item is not a standard stock item and is considered a|Y
01|109196|1|3|special.  Once an order is placed this cannot be|Y
01|109196|1|4|cancelled or returned.|Y
01|109209|2|1|Non standard stock itemwill need to confirm lead with|Y
01|109209|2|2|our purchasing department|Y
01|109210|1|1|121525|Y
01|109210|2|1|121526|Y
01|109217|3|1|LYNDEX NIKKEN TO CONFIRM PROPER NOSE|Y
01|109231|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|109232|21|1|Quoted as in stock option for NT10-056|Y
01|109239|1|1|Howa#  HH90150 Y-2311-10 Seal Kit|Y
01|109240|6|1|Standard Balluff Software Customization|Y
01|109255|3|1|Custom Block to be manufactured by Lyndex-Nikken.|Y
01|109256|1|1|Tooling Certficate #13687-2030-06222018|Y
01|109266|3|1|Quoted sa NET pricing|Y
01|109271|2|1|*Has needle roller bearings|Y
01|109274|1|1|Reference RGA# LVR-53156|Y
01|109274|1|2|Repair of customer's T32106 s/n: A0008|Y
01|109274|1|3|(Mimatic# T32106A06)|Y
01|109274|2|1|Spindle gears bearings seals o-rings and collet|Y
01|109274|2|2|nuts to be replaced.|Y
01|109274|2|3|*** We will try to clean up the original spindle and|Y
01|109274|2|4|gears and re-use; however we will not be able to tell|Y
01|109274|2|5|if it will be re-usable until assembled and test ran.|Y
01|109274|2|6|If we are able to re-use spindle the price will be|Y
01|109274|2|7|$1084.44 if we are able to re-use both spindle and|Y
01|109274|2|8|gear the price will be $948.89|Y
01|109284|7|1|cust to machine to 2.25mm|Y
01|109284|10|1|cust to machine to 2.50mm|Y
01|109284|15|1|*no coolant nut or disc required|Y
01|109284|15|2|(Can use std nut or coolant nut on holder)|Y
01|109284|17|1|*no coolant nut or disc required|Y
01|109284|17|2|(Can use std nut or coolant nut on holder)|Y
01|109284|19|1|*no coolant nut or disc required|Y
01|109284|19|2|(Can use std nut or coolant nut on holder)|Y
01|109284|24|1|cust to machine to 1mm|Y
01|109284|27|1|cust to machine to 1.25mm|Y
01|109284|30|1|cust to machine to 1.5mm|Y
01|109284|33|1|cust to machine to 2.25mm|Y
01|109284|36|1|cust to machine to 2.5mm|Y
01|109284|39|1|cust to machine to 2.75mm|Y
01|109284|41|1|*no coolant nut or disc required|Y
01|109284|41|2|(Can use std nut or coolant nut on holder)|Y
01|109284|44|1|cust to machine to 1/4|Y
01|109287|28|1|ETA 2/26 option coolant collet below|Y
01|109287|29|1|Alternative for E40-032|Y
01|109294|3|1|5.17 Gauge Length|Y
01|109294|4|1|2.50 Gauge Length|Y
01|109294|7|1|4.42 Overall Length|Y
01|109294|12|1|75mm Gauge Length|Y
01|109294|13|1|5.00 Gauge Length|Y
01|109304|1|1|FLETCHER POLAND'S TRUNK STOCK SHRINK FIT UNIT|Y
01|109304|1|2|SPECIAL DEMO UNIT PRICING ON THIS UNIT ONLY|Y
01|109346|2|1|BT30-SK13-120|Y
01|109346|2|2|BT30 SK13 Slim Chuck|Y
01|109347|1|1|Item is a non standard stock item priced at NET price|Y
01|109347|1|2|This item is not cancelable nor returnable once the|Y
01|109347|1|3|order is placed.Lead time is based on receipt of the|Y
01|109347|1|4|order|Y
01|109350|1|1|Consignment prior to purchase|Y
01|109361|1|1|Reference RGA# TAR-53017|Y
01|109361|1|2|Tilt brake is slipping please evaluate brake system|Y
01|109361|1|3|on tilt side and do PM.|Y
01|109361|1|4|5AX-130 s/n: 3772|Y
01|109361|31|1|Table must ship in a secured wooden crate.|Y
01|109396|1|1|Chip hole only Per drawing HSK63A-80/ Rev A increased|Y
01|109396|1|2|depth of chip pocket was 150+-.010>>> now .170 +- .010|Y
01|109413|7|1|BT40-MMC8C-150|Y
01|109413|11|1|BT40-MMC12C-150|Y
01|109422|2|1|Labor travel expenses for swap of new table on|Y
01|109422|2|2|machine with existing table|Y
01|109440|21|1|for HSK63A-C3/4-95G MC|Y
01|109440|22|1|for SK10 collet chuck|Y
01|109440|23|1|for SK6 collet chuck|Y
01|109440|24|1|for SK16 collet chuck|Y
01|109440|25|1|for HSK63 Coolant Tubes|Y
01|109454|1|1|Service Call performed by Alec Schneider on 2/1/19|Y
01|109454|1|2|5AX-130|Y
01|109454|2|1|Transit Time: 3.25hrs x $100.00/hr = $325.00|Y
01|109454|2|2|Gas Per Mileage: 120mi x 0.565/mi = $67.80|Y
01|109454|2|3|Meal: $20.00|Y
01|109454|5|1|Labor: 2.5hrs x $135.00/hr = $337.50|Y
01|109467|3|1|10ft Cable Set|Y
01|109467|8|1|10ft Cable Set|Y
01|109472|2|1|10ft Cable Set|Y
01|109491|1|1|Installed w/ PS-130E pull stud|Y
01|109491|2|1|Installed on BT30-TB40-150|Y
01|109527|4|1|Replacement for BMT65-ER32Z-ICE if they need tooling|Y
01|109527|4|2|before end of April. This is not ICE.|Y
01|109530|1|1|Refer to drawing for dimension confirmation|Y
01|109530|2|1|Refer to drawing for dimension confirmation|Y
01|109532|2|1|Installation includes: drive unit short bar fiber|Y
01|109532|2|2|optic cables communication cables bulk head cable|Y
01|109532|2|3|set external cable set parameter changes service|Y
01|109532|2|4|time and travel|Y
01|109535|12|1|COMMUNICATIONS CABLE  A660-2005-T626/L150R0A|Y
01|109536|1|1|Discount per special GMJ pricing|Y
01|109550|1|1|INCLUDES CABLES|Y
01|109554|1|1|HATHOR 6 WITH 50 TAPER SPINDLE|Y
01|109554|7|1|Standard Balluff Software Customization|Y
01|109559|1|1|Reference RGA# TAR-53066|Y
01|109559|1|2|5AX-201YA-M s/n: 5960 Table crash.|Y
01|109565|1|1|500 PSI required for the hydraulic unit.|Y
01|109565|6|1|Includes parameter changes cable installation|Y
01|109565|6|2|service time and travel.|Y
01|109565|6|3|** Includes motor credit for conversion once new|Y
01|109565|6|4|DMG MORI machine arrives **|Y
01|109566|1|1|CAT40 6mm Hydraulic Holder  80.5mm Gage Length|Y
01|109566|2|1|CAT40 8mm Hydraulic Holder  80.5mm Gage Length|Y
01|109566|3|1|CAT40 10mm Hydraulic Holder  80.5mm Gage Length|Y
01|109567|2|1|Installation includes: Drive unit short bar fiber|Y
01|109567|2|2|optic cable bulkhead cables external cables|Y
01|109567|2|3|parameter changes service time and travel.|Y
01|109583|21|1|Per Drawing - Non-Coolant|Y
01|109583|23|1|Per Drawing - Coolant Thru|Y
01|109588|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|109588|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|109588|3|1|Okuma Live X-axis ER40 2000rpm VDI <SIDE>|Y
01|109588|3|2|OKLB35-ER40X|Y
01|109588|3|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|109588|4|1|Okuma Live Z-axis ER40 2000rpm VDI <FACE>|Y
01|109588|4|2|OKLB35-ER40Z|Y
01|109588|4|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|109597|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|109603|1|1|*2pc MIN pricing|Y
01|109603|2|1|Qty Break Pricing|Y
01|109603|12|1|*2pc MIN pricing|Y
01|109603|13|1|Qty Break Pricing|Y
01|109607|14|1|Confirm for HAAS|Y
01|109621|1|1|We have all collets except 100-046 23/32 & 100-047|Y
01|109621|1|2|47/64 Both due 2nd week of April. We can break set|Y
01|109621|1|3|down to individual pcs and ship partial. However|Y
01|109621|1|4|each collet will be invoiced separately.|Y
01|109638|1|1|Reference RGA# TOR-53101|Y
01|109638|1|2|NMTB40-NPU13-86 Customer states chuck has runout.|Y
01|109658|1|1|HSK50C-SZF25-100|Y
01|109658|2|1|HSK50C-SZF16-90|Y
01|109658|3|1|HSK50C-SZF10-80|Y
01|109658|4|1|HSK50C-SZF6-70|Y
01|109662|1|1|Reference RGA# TAR-53089|Y
01|109662|1|2|5AX-130FA-M s/n: 4794|N
01|109665|4|1|Installation includes: drive unit short bar fiber|Y
01|109665|4|2|optic cables communication cables bulk head cable|Y
01|109665|4|3|set external cable set parameter changes service|Y
01|109665|4|4|time and travel|Y
01|109680|1|1|Blanket quote for rotary tables.|Y
01|109680|1|2|CNC601FA|N
01|109684|1|1|Pressure Plug for H012M10|Y
01|109684|1|2|Delivery: 9 weeks plus shipping|Y
01|109684|2|1|AS568-010 O-Ring|Y
01|109700|1|1|Reference RGA# TOR-53189|Y
01|109700|1|2|CAT50-UMT200UH Probe refuse to work.|Y
01|109700|3|1|Calibration service included.|Y
01|109749|1|1|TOOLS 1 12 16 17 20|Y
01|109749|3|1|TOOL 19|Y
01|109751|2|1|Installation includes: drive unit short bar fiber|Y
01|109751|2|2|optic cables communication cables bulk head cable|Y
01|109751|2|3|set external cable set parameter changes service|Y
01|109751|2|4|time and travel|Y
01|109755|1|1|Reference RGA# TAR-53140|Y
01|109755|1|2|CNC260TSA-M s/n: n/a|N
01|109777|2|1|Installation includes: drive unit short bar fiber|Y
01|109777|2|2|optic cables communication cables bulk head cable|Y
01|109777|2|3|set external cable set parameter changes service|Y
01|109777|2|4|time and travel|Y
01|109781|15|1|CAT50-SF0312-3.15CP CAT50 5/16 Shrink Fit Holder|Y
01|109781|15|2|Pre-Balanced with Coolant Ports|Y
01|109781|15|3|Minimum order quantity 7-pieces.|Y
01|109782|1|1|7 pcs available immediate. 5 pcs mid march|Y
01|109782|2|1|4pc availablw immediate. 4 additional mid march.|Y
01|109782|2|2|balance beginning of MAY. WE CAN USE THE 3 SPINDLE|Y
01|109782|2|3|WHICH WE HAVE 4 PCS TILL BALANCE ARRIVE|Y
01|109782|4|1|10 pcs stock balance march delivery|Y
01|109782|4|2|`|Y
01|109782|11|1|4TH INREFACE INCLUDES SERVO AMPCONNECTORS MACHINE|Y
01|109782|11|2|CABLES FIBRE OPTICS TRAVEL LABOR TRAINING|Y
01|109782|11|3|QUOTE BASED UPON 4 installs|Y
01|109782|13|1|$1000 FACE VALUE CERTIFICATE WITH EACH TABLE|Y
01|109784|7|1|inch Set will be avail on 3/15 OR|Y
01|109784|7|2|sub out 1 size missing: 13/32 for 10.5mm|Y
01|109784|11|1|Kitamura JIS-B6339-89 **Coolant Thru**|Y
01|109784|11|2|Drawing confirmed|Y
01|109788|55|1|**Promo Pricing - Qty to Match CAT50 holders purchased|Y
01|109790|1|1|10pc=3wks & balance = end of May|Y
01|109819|1|1|Includes (2)CAT50 Chuck Holders|Y
01|109855|2|1|Warranty replacement for defective nut originally|Y
01|109855|2|2|shipped on C4007-0016-3.50 on Inv# 2188562.|Y
01|109855|2|3|Customer has been advised by Justin Hood to scrap|Y
01|109855|2|4|the original nut.|Y
01|109861|1|1|***5 PC. MINIMUM REQUIRED***|Y
01|109867|3|1|Installation includes: drive unit short bar fiber|Y
01|109867|3|2|optic cables communication cables bulk head cable|Y
01|109867|3|3|set external cable set parameter changes service|Y
01|109867|3|4|time and travel|Y
01|109870|1|1|Delivery 02/22 if ordered today.|Y
01|109878|1|1|Delivery 02/22 if ordered today.|Y
01|109880|4|1|BT50-SF14-90  14mm Shrink Fit Holder|Y
01|109880|4|2|Pre-Balanced With 90MM Gage Length|Y
01|109880|4|3|Please  Note: This toolholder is non standard stock.|Y
01|109880|4|4|Once a purchase order is placed it cannot be cancelled|Y
01|109880|4|5|or returned.|Y
01|109880|8|1|BT50-SF18-90  18mm Shrink Fit Holder Pre-Balanced|Y
01|109880|8|2|with 90mm Gage Length|Y
01|109880|8|3|Please  Note: This toolholder is non standard stock.|Y
01|109880|8|4|Once a purchase order is placed it cannot be cancelled|Y
01|109880|8|5|or returned.|Y
01|109884|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|109885|1|1|Tilting rotary table with cables and rotary joints|Y
01|109894|1|1|320MM face plate with shortest cover posible|Y
01|109894|3|1|PBA-170 Tailstock with MT#4 center socket.|Y
01|109894|3|2|Note the tail stock and table center height do not|Y
01|109894|3|3|match. Sub plate not included.|Y
01|109899|3|1|Includes Installation Drive Units Bulkhead Cables|Y
01|109899|3|2|External Cables Service Time & Travel.|Y
01|109900|1|1|PRICE IS NET TO AMERASEIKI|Y
01|109900|1|2|ITEM IS A SPECIAL.  DEPOSIT AT TIME OF ORDER REQUIRED|Y
01|109900|2|1|External (Cutting Area) Cable Set|Y
01|109900|2|2|Length TBD|Y
01|109900|2|3|PRICE IS NET TO AMERASEIKI|Y
01|109900|3|1|PRICE IS NET TO AMERASEIKI|Y
01|109900|3|2|PRICE INCLUDES SERVO AMP INSTALLAITON MISC ITEMS|Y
01|109903|8|1|**Coolant disc needed for collet and coolant collet|Y
01|109903|8|2|system|Y
01|109903|12|1|*wrench for coolant tubes|Y
01|109903|13|1|*wrench for coolant disc|Y
01|109917|12|1|COMMUNICATIONS CABLE  A660-2005-T626/L150R0A|Y
01|109919|1|1|Reference RGA# CUR-53193|Y
01|109919|1|2|B40-MRAM-IC s/n: 6516402 (Mim# 162815)|Y
01|109919|2|1|Replace all bearings seals and o-rings.|Y
01|109935|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|109943|9|1|INCLUDES SERVO MOTOR INTERNAL WIRE HARNESS BULKHEAD|Y
01|109943|9|2|CONNECTORS FIBRE OPTIC CABLECONNECTORSAMPLIFIER|Y
01|109943|9|3|TRAVEL LODGING AND TRAINING|Y
01|109943|9|4|ALSO INCLUDES INSTALL OF TAILSTOCK AND LEVER SWITCH|Y
01|109944|6|1|SCALE FOR TILT AXIS|Y
01|109944|10|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|109944|12|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|109944|12|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|109944|12|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|109949|1|1|SGDH-08AE-S Yaskawa Servo Pack|Y
01|109949|1|2|***Please note that this is a discontinues item and|Y
01|109949|1|3|quantities are limited.|Y
01|109951|1|1|Service call performed by Jun & Kaz on 1/3/19 - 1/4/19|Y
01|109951|1|2|2x 5AX-130FA-M s/n: 3532 & NA|Y
01|109951|2|1|Transit time: 12hrs x $100.00/hr = $1200.00|Y
01|109951|2|2|Gas/Mileage: 240mi x 0.565/mi = $135.60|Y
01|109951|2|3|Meals: $50.00/Day for 2 Tech for 2 Days = $200.00|Y
01|109951|3|1|14.33hrs/Tech = 28.66hrs x $135.00 =|Y
01|109951|4|1|Used for 5AX-130FA-M s/n: NA|Y
01|109951|5|1|Used for 5AX-130FA-M s/n: NA|Y
01|109951|6|1|Used for 5AX-130FA-M s/n: NA|Y
01|109951|7|1|Used for 5AX-130FA-M s/n: NA|Y
01|109951|8|1|Used for 5AX-130FA-M s/n: NA|Y
01|109951|9|1|Used for 5AX-130FA-M s/n: NA|Y
01|109951|10|1|Used for 5AX-130FA-M s/n: NA|Y
01|109951|11|1|Used for 5AX-130FA-M s/n: 3532|Y
01|109959|1|1|***need to confirm the necessary spindle dimensional|Y
01|109959|1|2|information prior to designing the block***|Y
01|109959|4|1|***Need to confirm block is large enough to cover|Y
01|109959|4|2|mounting holes on their machine spindle face.***|Y
01|109959|4|4|***Also regarding PB-RAN50-BLANK we need to confirm|Y
01|109959|4|5|what angle head they need the block for***|Y
01|109964|1|1|Reference RGA# TAR-53092|Y
01|109964|1|2|TAT-400 s/n: NA Leaking Hydraulic oil when changing.|Y
01|109972|1|1|Reference RGA# TAR-53233|Y
01|109972|1|2|CNC260FA-M s/n: 10362C Table was crashed and has|Y
01|109972|1|3|excessive backlash.|Y
01|109972|24|1|KS-CN252R-FA1/2: Motor cover|Y
01|109972|24|2|Delivery Pending|Y
01|109980|1|1|Standard Pitch (P=82)|Y
01|109980|1|2|Quoted at Net Price|Y
01|109980|3|1|Pitch P=75|Y
01|109980|3|2|Quoted at Net Price|Y
01|109987|1|1|Tooling Certificate #13170-2172-121118|Y
01|109987|2|1|Delivery Pendingcan't provide a date yet|Y
01|109987|6|1|In stock option to unavailable ER32 size holder above|Y
01|109994|1|1|Reference RGA# TAR-53114|Y
01|109994|1|2|5AX-201FA s/n: NA Table was severely crashed.|Y
01|109997|1|1|HSK40E-SK20-80P or shortest gauge length|Y
01|109997|3|1|HSK40E-SK25-80P or shortest gauge length|Y
01|110010|1|1|I can ship 50-pcs now and balance 04/09.|Y
01|110013|1|1|**collet nut wrench|Y
01|110013|2|1|**Spindle Wrench|Y
01|110020|8|1|for 6mm /.236|Y
01|110020|10|1|for 6mm /.236|Y
01|110020|11|1|***NOT AVAIL in Coolant Through|Y
01|110020|13|1|for 6mm /.236|Y
01|110020|19|1|for 6mm /.236|Y
01|110021|4|1|DUAL AXIS CABLE SET FOR ROBODRILL|Y
01|110028|1|1|Reference RGA# TAR-53141|Y
01|110028|1|2|TAT-250 s/n: n/a|N
01|110046|2|1|Installation includes: Dual axis drive short bar|Y
01|110046|2|2|communications cable external cables bulkhead cables|Y
01|110046|2|3|parameter changes service time and travel.|Y
01|110048|1|1|Reference RGA# TOR-53133|Y
01|110048|1|2|HSK100A-C32-135 Unit will not be tighten correctly.|Y
01|110070|1|1|Reference RGA# TAR-53230|Y
01|110070|1|2|CNCZ180LSA3 s/n: 2024|N
01|110079|5|1|5 GL this is an alternative in stock to the 3.13 GL|Y
01|110082|1|1|1#|Y
01|110082|3|1|1#|Y
01|110082|5|1|2#|Y
01|110089|1|1|PRE-HATHOR6 WITH 50 TAPER SPINDLE|Y
01|110089|4|1|C8 Presetter Master Gauge|Y
01|110089|5|1|C8 Toolholding Fixture|Y
01|110095|10|1|New Part Number will be HSK100A-SK20C-120-IDI|Y
01|110097|5|1|Quoted as option|Y
01|110099|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|110099|1|2|Delivery 5-6 weeks from receipt of order|Y
01|110103|1|1|Cables included|Y
01|110107|5|1|End User Tooling Certificate Promotion $1250.00|Y
01|110117|1|1|Reference RGA# TAR-53231|Y
01|110117|1|2|CNCZ201LFA s/n: 8162 Brakes slipping.|Y
01|110122|1|1|1#|Y
01|110122|3|1|1#|Y
01|110122|5|1|2#|Y
01|110122|43|1|old req was 130mm (5.12)/ We make w/ 2.87 GL|Y
01|110122|43|2|N/A in Taper Plus/NCAT40|Y
01|110122|55|1|old req was 100mm (3.93)/ We make w/ 3.50 GL|Y
01|110122|55|2|N/A in Taper Plus/NCAT40|Y
01|110122|62|1|M16 - BUT confirm shank and square of tap!|Y
01|110122|62|2|This is for US/ANSI Tap|Y
01|110122|69|1|N/A in NCAT40/Taper Plus|Y
01|110128|1|1|Note: Above tool is non standard stock. Once a purchase|Y
01|110128|1|2|is placed it cannot be canceled or returned.|Y
01|110128|1|3|NC5-63-HC20-100  has pull stud PS-N63AE  installed.|Y
01|110134|1|1|Not include motorcables|Y
01|110134|1|2|Current availability is reference subject to change|Y
01|110157|1|1|Reference RGA# LVR-53234|Y
01|110157|1|2|MZQT5-ER40Z-ICE s/n: 81387 03|Y
01|110157|1|3|(Mimatic# 124877)|Y
01|110157|2|1|Bearings seals and o-rings to be replaced.|Y
01|110157|4|1|MZQT5-ER40Z-ICE s/n: 33491 03|Y
01|110157|4|2|(Mimatic# 124877)|Y
01|110157|5|1|Bearings seals and o-rings to be replaced.|Y
01|110157|5|2|Resurface spindles as needed.|Y
01|110157|7|1|MZQT5-ER40X-OFF-ICE s/n: 81780 03|Y
01|110157|7|2|(Mimatic# 189956 Ref# 123690)|Y
01|110157|8|1|Bearings seals and o-rings to be replaced.|Y
01|110157|8|2|Rework bore and press new sleeve into housing for|Y
01|110157|8|3|proper fit/alignment of the locating pin in Germany.|Y
01|110157|10|1|MZQT5-ER40X-OFF-ICE s/n: 48285 02|Y
01|110157|10|2|(Mimatic# 189956 Ref# 126390)|Y
01|110157|11|1|Bearings seals and o-rings to be replaced.|Y
01|110157|11|2|Resurface spindls as needed.|Y
01|110157|11|3|Rework bore and press new sleeve into housing for|Y
01|110157|11|4|proper fit/alignment of the locating pin in Germany.|Y
01|110166|6|1|Offered as an in stock option.|Y
01|110166|14|1|ETA Bal 5 pc pending|Y
01|110179|1|1|OKEX-ER40Z  (191172)|Y
01|110179|1|2|Okuma live; BMT60; ER40 Z-Axis L1=70mm; 1:1 Gear ratio|Y
01|110179|1|3|max 70Nm; 6500 RPM; Ext Coolant; No reversal of|Y
01|110179|1|4|rotation direction; ref drwg#00052308|Y
01|110184|1|1|Reference RGA# TAR-53246|Y
01|110184|1|2|P-170S  Sending in for evaluation.|Y
01|110201|3|1|Includes amplifier interface cables external cables|Y
01|110201|3|2|communications cable fiber optic cable short bar|Y
01|110201|3|3|travel labor expenses|Y
01|110214|1|1|Reference RGA# TAR-53068|Y
01|110214|1|2|5AX-2002A21 s/n: 2069 Table has an oil leak.|Y
01|110230|1|1|Item is non standard stock.Once ordered will not be|Y
01|110230|1|2|cancelable nor returnable|Y
01|110230|2|1|Item is non standard stock item.Once ordered will not|Y
01|110230|2|2|be cancelable nor returnable|Y
01|110262|7|1|PRICE IS NET TO ELLISON|Y
01|110262|7|2|PRICE INCLUDES SERVO AMP AND MISC FOR PROFESSIONAL|Y
01|110262|7|3|INSTALL.|Y
01|110263|7|1|PRICE IS NET TO ELLISON|Y
01|110263|7|2|PRINCE INCLUDES SERVO AMP AND ALL MISC ITEMS FOR|Y
01|110263|7|3|PROFESSIONAL INSTALL.|Y
01|110264|1|1|PRICE IS NET TO ELLISON MACHINE TOOL|Y
01|110264|1|2|ITEM IS A SPECIAL.  DEPOSIT AT TIME OF ORDER REQUIRED|Y
01|110264|2|1|External (Cutting Area) Cable Set|Y
01|110264|2|2|Length TBD|Y
01|110264|2|3|PRICE IS NET TO ELLISON TECHNOLOGIES|Y
01|110264|3|1|PRICE IS NET TO ELLISON TECHNOLOGIES|Y
01|110264|3|2|PRICE INCLUDES SERVO AMP INSTALLAITON MISC ITEMS|Y
01|110283|4|1|replaces SKN-10B(GH)|Y
01|110284|1|1|1pc stock remaining ETA aprox 2 weeks|Y
01|110296|6|1|NCAT40-SF0375-6.30 CAT40 3/8 Shrink Fit Holder|Y
01|110296|6|2|Pre-Balanced>> Taper Plus|Y
01|110309|1|1|Tooling Cert # = PENDING|Y
01|110325|1|1|CAT40-HC0250-4.00|Y
01|110325|6|1|CAT40-HC1250-4.00|Y
01|110334|2|1|Quoted as in stock option|Y
01|110334|10|1|Quoted as in stock option|Y
01|110354|1|1|DIRECT REPLACEMENT FOR A21CONTROL AND MOTOR|Y
01|110354|1|2|NO MOTOR OR CONTROLLER|Y
01|110354|1|3|DELIVERY EXPECTED OCTOBER 2019|Y
01|110354|1|4|WILL LOOK TO SEE IF ANY OTHER NIKKEN FACILITY MAY|Y
01|110354|1|5|HAVE STOCK|Y
01|110366|1|1|Tooling Certificate Number: 8098-2203-011619|Y
01|110367|6|1|NCAT40-SF0375-6.30 CAT40 3/8 Shrink Fit Holder|Y
01|110367|6|2|Pre-Balanced>> Taper Plus|Y
01|110371|1|1|Reference RGA# LVR-53188|Y
01|110371|1|2|Repair of customer's MNL12-ER32Z-MS s/n: A0765(Alps#|Y
01|110371|1|3|T32216) and MNL12-ER32X s/n: A1286(Alps# T32206)|Y
01|110371|2|1|MNL12-ER32Z-MS s/n: A0765 (Alps# T32216)|Y
01|110371|2|2|Bearings Seals O-rings Collet Nuts Bearing Nut|Y
01|110371|2|3|to be replaced.|Y
01|110371|3|1|MNL12-ER32X s/n: A1286 (Alps# T32206)|Y
01|110371|3|2|Bearings Seals O-rings Collet Nut Bearing Nut|Y
01|110371|3|3|to be replaced.|Y
01|110390|1|1|Face Value $25000|Y
01|110396|11|1|for ECH13 holders|Y
01|110396|13|1|for ECH20 holders|Y
01|110406|4|1|Lyndex-Nikken to make position block upon receipt|Y
01|110406|4|2|of spindle drawing info|Y
01|110431|2|1|NEED TO DETERMINE AC VS DC POWER|Y
01|110431|3|1|CLAMP CONFIRMATION ADN ENCODER CABLE ONE EA AXIS|Y
01|110431|4|1|COST IS NET TO HAAS FACROTY OUTLET|Y
01|110431|4|2|COST INCLUDES SERVO AMP WIRING AND ALL TRAVEL|Y
01|110434|2|1|NEED TO DETERMINE AC VS DC POWER SUPPLY|Y
01|110434|3|1|CLAM CONFIRMATION AND ENCODER SET ONE EA AXIS|Y
01|110434|4|1|COST IS NET TO HAAS FACTORY OUTLET|Y
01|110434|4|2|COST INCLUSES SERVO AMP WIRING AND ALL TRAVEL|Y
01|110446|1|1|***Includes (1) set of soft jaws***|Y
01|110447|2|1|***|Y
01|110447|2|2|Prepared with MT#3 sockets|Y
01|110447|2|3|***|Y
01|110463|1|1|Quoted at Net Price|Y
01|110483|4|1|Please Note: Lyndex-Nikken questionnaire must be|Y
01|110483|4|2|completed and returned when ordering this item.|Y
01|110483|4|3|Application will be approved thru the Lyndex-Nikken|Y
01|110483|4|4|engineering department.|Y
01|110483|4|5|A positioning block may be require and has not been|Y
01|110483|4|6|added to quote.|Y
01|110512|2|1|Quoted as in stock option.|Y
01|110515|1|1|HSK80F-C1.1/4-110G|Y
01|110517|3|1|We cannot supply SF8 holders with coolant ports.|Y
01|110517|5|1|Please note holders come with 2 coolant ports only.|Y
01|110517|7|1|Please note holders come with 2 coolant ports only.|Y
01|110523|1|1|HFO TO PROVIDE LYNDEX NIKKEN MOTOR AND CABLES|Y
01|110523|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|110523|5|1|PROMOTION TOOL KIT|Y
01|110524|1|1|Replacement for CNCZ180LSA-BR2-QT/R650 due to delivery|Y
01|110524|1|2|delays. Being sold at same price as a special one time|Y
01|110524|1|3|pricing|Y
01|110526|3|1|***HYD-UNIT-NACHI-DC24V unit included***|Y
01|110526|6|1|Installation includes: drive unit short bar fiber|Y
01|110526|6|2|optic cables communication cables bulk head cable|Y
01|110526|6|3|set external cable set parameter changes service|Y
01|110526|6|4|time and travel|Y
01|110538|1|1|Pricing reflects one time test value|Y
01|110554|1|1|Offered as in stock option.|Y
01|110555|1|1|Service Call for 3 days including transit days for 1|Y
01|110555|1|2|technician.|Y
01|110555|2|1|Transit Time: 23hrs x $100.00/hr = $2300.00|Y
01|110555|2|2|Airfare & Car Rental: $920.00|Y
01|110555|2|3|Hotel: $275.00|Y
01|110555|2|4|Meals: $75.00/day x 3 Days (Incl Transit days)= $225.00|Y
01|110555|2|5|Gas & Parking: $50.00|Y
01|110555|4|1|Amp Ext Cable & interface cable.|Y
01|110559|1|1|Offered as an in stock alternative for BO on SO800496|Y
01|110564|2|1|Warranty replacement for defective unit shipped out on|Y
01|110564|2|2|original Inv# 2183124.|Y
01|110564|2|3|Customer has been advised to not return the original|Y
01|110564|2|4|unit.|Y
01|110575|1|1|Replaces old part# SKN-10B(GH)|Y
01|110600|1|1|C5006-12-2.63DIN We will plug the DIN holes. This|Y
01|110600|1|2|will not be coolant thru after we plug them.|Y
01|110615|1|1|BMT85-CT40Z-ICE BMTY85 BMT85; CAT40; 90deg|Y
01|110615|1|2|CAT40;:1 Gear ratio; max 100 Nm torque; 6500 RPM|Y
01|110615|1|3|output is reversal to input;Int/Ext coolant max 1015PSI|Y
01|110615|1|4|ref drwg # 00055171|Y
01|110615|1|5|Delivery is based on when approval is signed|Y
01|110615|1|6|Item is a nonstandard stock item and is not cancelable|Y
01|110615|1|7|nor returnable once order is placed|Y
01|110615|1|8|Pricing is NET Pricing|Y
01|110615|2|1|BMT85-CT40X-ICE:BMT85;CAT40;straight L=72mm;|Y
01|110615|2|2|1:1 Gear ratio; max 80 Nm torque; 6500 RPM|Y
01|110615|2|3|Int/ Ext coolant max 1015 PSI; ref drwg # 00055174|Y
01|110615|2|4|Delivery is based on approval date|Y
01|110615|2|5|Item is nonstandard stock and is not canceleble nor|Y
01|110615|2|6|returnable once the order is placed|Y
01|110615|2|7|Items are at NET Price|Y
01|110626|3|1|Customer must have a position block to utilize this|Y
01|110626|3|2|tool|Y
01|110638|1|1|S-NC5-46-FMA31.75CS-45-M  w/PS-N46E|Y
01|110638|1|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|2|1|S-NC5-46-FMA25.4CS-55 w/PS-N46E|Y
01|110638|2|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|4|1|w/PS-N46E|Y
01|110638|4|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|5|1|NC5-46-C25-90 w/PS-N46E|Y
01|110638|5|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|7|1|w/PS-N46E|Y
01|110638|7|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|8|1|NC5-46-SK10C-75-J w/PS-N46E|Y
01|110638|8|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|9|1|w/PS-N46E|Y
01|110638|9|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|10|1|NC5-46-SK10C-90-J w/PS-N46E|Y
01|110638|10|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|11|1|w/PS-N46E|Y
01|110638|11|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|12|1|w/PS-N46E|Y
01|110638|12|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|13|1|NC5-46-SK10C-150 w/PS-N46E|Y
01|110638|13|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|14|1|w/PS-N46E|Y
01|110638|14|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|15|1|NC5-46-SK16C-90-J w/PS-N46E|Y
01|110638|15|2|Quoted as net pricing no returnable no cancellable|Y
01|110638|38|1|SKG10-10HGAS|Y
01|110638|54|1|SK10-6.5AC|Y
01|110638|54|2|Quoted as net pricing no returnable no cancellable|Y
01|110642|1|1|Reference RGA# LVR-53237|Y
01|110642|1|2|Repair of customer's MNL12-ER40Z s/n: A0267|Y
01|110642|1|3|(Alps# T32214)|Y
01|110642|2|1|Bearings O-rings Seals Collet Nut Rear Cover and|Y
01|110642|2|2|Bearing nut to be replaced.|Y
01|110649|1|1|Tooling Certificate Number:  13485-1141-031318|Y
01|110651|2|1|*** MT#3 socket ***|Y
01|110654|17|1|PRO|Y
01|110654|26|1|We do not offer CAT50 2.0 Shell Mill Holder w/4 gage.|Y
01|110666|2|1|Discount reflects a purchase order for 6+ holders.|Y
01|110675|13|1|COMMUNICATIONS CABLE  A660-2005-T626/L150R0A|Y
01|110687|12|1|Considered Complete at 66 pieces. This item is|Y
01|110687|12|2|discontinued after the 66 pieces are gone.|Y
01|110698|1|1|1-9pc|Y
01|110698|2|1|10-19pc pricing|Y
01|110698|3|1|20+pc|Y
01|110702|3|1|SERVO MOTOR WITH GEAR|Y
01|110702|5|1|POWER/FEEDBACK/SIGNAL WIRE HARNESS INSIDE TABLE|Y
01|110702|5|2|FOR MATSURRA VX-1000|Y
01|110702|8|1|INSTALLATION KIT ITEMIZED BELOW|Y
01|110702|12|1|SPECIAL FEEDBACK CABLE FOR MATSUURA (KEYS)|Y
01|110702|16|1|COMMUNICATIONS CABLE  A660-2005-T626/L150R0A|Y
01|110717|1|1|This is a direct Kitagawa B-206A crossover. If|Y
01|110717|1|2|the customer has an existing adapter plate they do|Y
01|110717|1|3|not need another one. Please advise if they need it|Y
01|110717|1|4|and we will add to the quote.|Y
01|110742|6|1|Haas External Cable Set|Y
01|110748|1|1|16C-diameter 1.132 +0.000 -0.002 3 slotted collet|Y
01|110763|4|1|warranty repair of 5AX-130YA-M s/n: 5638.|Y
01|110763|4|2|Reference RGA# QUA-53264|Y
01|110767|2|1|Plug din holds|Y
01|110772|1|1|270MM THROUGH HOLE|Y
01|110772|2|1|SCALE KIT|Y
01|110772|2|2|COST IS NET|Y
01|110772|3|1|800MM CHUCK WITH ADAPTER PLATE|Y
01|110772|3|2|COST IS NET|Y
01|110772|4|1|CLAMP VERIFICATION ENCODER AND SCALE WIRING SET|Y
01|110772|5|1|NEED TO VERIFY MACHINE HAS DC OR AC SUPPLY|Y
01|110772|6|1|PRICE IS NET|Y
01|110773|1|1|13.5 THROUGH HOLE|Y
01|110773|2|1|SCALE KIT|Y
01|110773|2|2|COST IS NET|Y
01|110773|3|1|630MM CHUCK 16 THROUGH HOLE AND ADAPTER KIT|Y
01|110773|3|2|COST IS NET|Y
01|110773|4|1|CLAMP VERIFICATION ENCODER AND SCALE WIRING SET|Y
01|110773|5|1|NEED TO VERIFY MACHINE HAS DC OR AC SUPPLY|Y
01|110773|6|1|PRICE IS NET|Y
01|110774|1|1|180MM indexer with Nikken Alpha 21 controller with|Y
01|110774|1|2|cables pendant for programming M-code cable power|Y
01|110774|1|3|cable and external cables.|Y
01|110774|3|1|Installation includes: Drive unit short bar fiber|Y
01|110774|3|2|optic cable communications cable bulkhead cables|Y
01|110774|3|3|external cables parameter changes service time and|Y
01|110774|3|4|travel.|Y
01|110784|5|1|std speed holder|Y
01|110784|6|1|for hi-speed holder (smooth nut)|Y
01|110787|2|1|**3/16 n/a in 6.30 - longest version we stock is|Y
01|110787|2|2|4.72|Y
01|110787|11|1|*verify Shop Power Supply prior to order|Y
01|110787|13|1|*2 corresponding pots at n/c with purchase of machine|Y
01|110791|4|1|AY0200 has to be installed/modified.|Y
01|110791|4|2|Delivery is 1-2 weeks from receipt of PO.|Y
01|110791|5|1|The first line item price is net to Hillary|Y
01|110791|5|2|Price includes servo amp all travel expenses and|Y
01|110791|5|3|miscellaneous items professional install.|Y
01|110798|1|1|BF130-d-D-T need in straight shank 1.1/4|Y
01|110798|1|2|Spot facing blade|Y
01|110798|2|1|BF130-d-D-T need in CAT50-Spot facing blade|Y
01|110800|1|1|Service Call completed by Gus Vazquez on 2/21/19|Y
01|110800|1|2|CNCZ180 s/n: 20492T|Y
01|110800|2|1|Transit time: 3.33hrs x $100.00/hr = $333.00|Y
01|110800|2|2|Gas/Mileage: 134.2 mi (RT) x $0.585/mi = $78.51|Y
01|110800|2|3|Meal: $25.00|Y
01|110800|3|1|6.17 hrs x $135/hr|Y
01|110810|4|1|Installation includes: drive unit short bar fiber|Y
01|110810|4|2|optic cables communication cables bulk head cable|Y
01|110810|4|3|set external cable set parameter changes service|Y
01|110810|4|4|time and travel|Y
01|110810|9|1|Installation includes: drive unit short bar fiber|Y
01|110810|9|2|optic cables communication cables bulk head cable|Y
01|110810|9|3|set external cable set parameter changes service|Y
01|110810|9|4|time and travel|Y
01|110818|2|1|Includes internal/external cables travel labor|Y
01|110818|2|2|expenses|Y
01|110821|13|1|Offered as an in stock option.|Y
01|110835|1|1|Substituting Taper plus for Highspeed|Y
01|110835|1|2|holder pricing|Y
01|110841|5|1|$ 1000.00 face value tool cert at no charge|Y
01|110849|1|1|2 WEEK DELIVERY FOR FINAL INSPECTION|Y
01|110849|2|1|POWER CABLE AND ENCODER CABLE 2 CABLES FOR EA|Y
01|110849|2|2|AXIS.  4 CABLES TOTAL.|Y
01|110857|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|110857|4|2|External Cables Service Time & Travel.|Y
01|110873|1|1|w/PS-N46E Lock Bolt(Coolant Through)|Y
01|110873|1|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|2|1|Parts#: S-NC5-46-FMA25.4CS-55-MA|Y
01|110873|2|2|w/PS-N46E Lock Bolt(Coolant Through)|Y
01|110873|2|3|Quoted as net pricing no returnable no cancellable|Y
01|110873|2|4|Note: Lock Bolt for ESR-63-10-I112653-N-N (AAC supply)|N
01|110873|3|1|w/PS-N46E Lock Bolt(Coolant Through)|Y
01|110873|3|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|4|1|w/PS-N46E|Y
01|110873|4|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|5|1|w/PS-N46E|Y
01|110873|5|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|7|1|w/PS-N46E|Y
01|110873|7|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|8|1|w/PS-N46E|Y
01|110873|8|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|9|1|w/PS-N46E|Y
01|110873|9|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|10|1|w/PS-N46E|Y
01|110873|10|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|11|1|w/PS-N46E|Y
01|110873|11|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|12|1|w/PS-N46E|Y
01|110873|12|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|13|1|w/PS-N46E|Y
01|110873|13|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|14|1|w/PS-N46E|Y
01|110873|14|2|Quoted as net pricing no returnable no cancellable|Y
01|110873|15|1|w/PS-N46E|Y
01|110873|15|2|Quoted as net pricing no returnable no cancellable|Y
01|110881|1|1|Reference RGA# TAR-53272|Y
01|110881|1|2|NSVZ300 s/n: 2197H Sent in for complete rebuild|Y
01|110881|2|1|Bearings seals & o-rings|Y
01|110881|3|1|Replacing the Brake system.|Y
01|110881|4|1|Worm wheel and worm screw assembly|Y
01|110885|1|1|Reference RGA# TAR-53323|Y
01|110885|1|2|NSVZ300 s/n: 2162 Sent in for complete rebuild|Y
01|110885|2|1|Bearings seals & o-rings|Y
01|110885|3|1|Replacing the Brake system.|Y
01|110885|4|1|Worm wheel and worm screw assembly|Y
01|110896|2|1|Replacing nuts under warranty.|Y
01|110896|2|2|Nuts originally shipped on C5027-0020-6.00|Y
01|110896|2|3|on Inv# 2165288.|Y
01|110896|2|4|Customer has been advised to dispose of the defective|Y
01|110896|2|5|units.|Y
01|110898|1|1|13.5 THROUGH HOLE|Y
01|110898|2|1|SCALE KIT|Y
01|110898|2|2|COST IS NET|Y
01|110898|3|1|630MM CHUCK 16 THROUGH HOLE AND ADAPTER KIT|Y
01|110898|3|2|COST IS NET|Y
01|110898|4|1|CLAMP VERIFICATION ENCODER AND SCALE WIRING SET|Y
01|110898|5|1|NEED TO VERIFY MACHINE HAS DC OR AC SUPPLY|Y
01|110898|6|1|PRICE IS NET|Y
01|110901|1|1|CAT40-NR601-190 Air Motor Spindle Tool|Y
01|110901|3|1|BT40-NR601-190 Air Motor Spindle Tool|Y
01|110911|1|1|Item standard in Japan - 1-2 Weeks shippment to U.S.|Y
01|110919|1|1|HFO to supply Motors and cable set to Lyndex Nikken to|Y
01|110919|1|2|install|Y
01|110919|3|1|HFO TO SUPPLY SERVO MOTORS AND CABLES LYNDEX NIKKEN TO|Y
01|110919|3|2|INSTALL|Y
01|110919|5|1|COLLET CHUCK PROMO KIT|Y
01|110919|5|2|NO CHARGE|Y
01|110922|1|1|ETA 1 WK upon measurements provided|Y
01|110922|1|2|Non-returnable Non-cancelable|Y
01|110926|1|1|This part is table specific and customer will need to|Y
01|110926|1|2|measure the thickness of their original part and advise|Y
01|110926|1|3|so we can have the replacement adjusted accordingly.|Y
01|110926|2|1|Replaces ISTW-90|Y
01|110936|4|1|Pricing reflects a Start II unit with 10 standard|Y
01|110936|4|2|shrink fit holders of the customers choice.|Y
01|110937|1|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|110938|1|1|Use P/N CNC321LYA-M - Includes Haas Motors & Cables|Y
01|110939|16|1|non coolant|Y
01|110947|1|1|Reference RGA# TOR-53300|Y
01|110947|1|2|CAT40-MMC12-90U The collet part is not working.|Y
01|110961|2|1|TABLE WITHOUT MOTOR HURCO TO SUPPLY LYNDEX NIKKEN TO|Y
01|110961|2|2|INSTALL|Y
01|110987|3|1|Modification service to change the standard nut to|Y
01|110987|3|2|hi-speed nut.|Y
01|111002|1|1|Item is on back order.For specific collets pls check|Y
01|111002|1|2|delivery separately|Y
01|111019|18|1|*order qty of coolant nuts to match qty of HSK63F|Y
01|111019|18|2|holders|Y
01|111049|2|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|111049|2|2|External Cables Service Time & Travel.|Y
01|111054|3|1|Set of 10ft Cables.|Y
01|111056|1|1|C5066-9/16-15.00|Y
01|111056|1|2|CAT50 9/16 with special d dimension|Y
01|111056|1|3|MOQ = 3 pieces|Y
01|111058|10|1|**Balance of orig request of H100A-SF16-160|Y
01|111058|13|1|*|Y
01|111077|2|1|INCLUDES TABLE CABLE HARNESS HYD. UNIT WITH HOSES|Y
01|111077|2|2|SERVO MOTORS|Y
01|111077|5|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|111077|5|2|External Cables Service Time & Travel.|Y
01|111082|1|1|**Non-returnable/ Non-Cancellable|Y
01|111086|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111086|1|2|0-50 PC pricing|Y
01|111086|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111086|2|2|51-100 pc pricing|Y
01|111086|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111086|4|2|1-50 PC pricing|Y
01|111086|5|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111086|5|2|51-100 pc pricing|Y
01|111092|1|1|Reference  RGA# TAR-53203|Y
01|111092|1|2|CNC601FA s/n:6017|N
01|111092|29|1|KS-CN501R-FAS5: Motor cover for CNC601FA|Y
01|111092|31|1|OPTIONAL: UPGRADE THE BRAKE SYSTEM|Y
01|111092|32|1|OPTIONAL: UPGRADE THE BRAKE SYSTEM|Y
01|111093|2|1|6500rpm 70Nm|Y
01|111095|1|1|QCC80 for Main Spindle|Y
01|111095|3|1|Pull back style is 1-2 Weeks - Dead length is pending|Y
01|111100|1|1|1TH-01016 Positioning Key|Y
01|111100|1|2|0H-KM050012 M5x12 Bolt|Y
01|111104|3|1|HSK63A-SK20C-135P|Y
01|111104|5|1|HSK63A-SK20-160P|Y
01|111104|7|1|HSK63A-SM32-100|Y
01|111104|9|1|HSK63A-SM32-160|Y
01|111108|1|1|Warehouse #2 Item.|Y
01|111115|3|1|*no stock in 4.53|Y
01|111117|2|1|Can J&E use this milling chuck instead of the 90mm gage|Y
01|111121|1|1|With Motor and Cables|Y
01|111121|2|1|Returning CNCZ180LSA3 s/n: 2024 disassembled.|Y
01|111121|2|2|Reference RGA# TAR-53230|Y
01|111122|2|1|Offered as an in stock option.|Y
01|111122|9|1|Very low stock on this item more due 6/11/19|Y
01|111122|11|1|Offered as an in stock option|Y
01|111124|1|1|*confirm power supply at time of purchase|Y
01|111125|4|1|Please Note: We are out of stock on C4006-0125-2.36.|Y
01|111125|4|2|However I have 10 C4006-0125B-DIN in stock. We can|Y
01|111125|4|3|plug the DIN holes in a day or two.|Y
01|111125|4|4|Quoted at NET price.|Y
01|111133|4|1|NOT NEEDED IF PRESETTER IS MOUNTED ON OTHER STAND|Y
01|111148|9|1|Nosealed coolant version avail.Must use coolant collet|Y
01|111148|9|2|system which includes the 3 items below|Y
01|111157|2|1|3x corresponding pots come with the machine at no|Y
01|111157|2|2|additional charge|Y
01|111157|2|3|1x for unit 2x for the 2 cooling stations|Y
01|111157|4|1|3x required. 1x machine unit 2x for 2 cooling stations|Y
01|111164|1|1|BMT65-ER32Z-MS-ICE|Y
01|111164|1|2|BMT65 Live ER32 90-Deg 1:1 Z-Axis C/L=100mm|Y
01|111164|3|1|BMT65-ER32Z-MS-ICE|Y
01|111164|3|2|BMT65 Live ER32 90-Deg 1:1 Z-Axis C/L=100mm|Y
01|111164|5|1|BMT65-ER32Z-MS-ICE|Y
01|111164|5|2|BMT65 Live ER32 90-Deg 1:1 Z-Axis C/L=100mm|Y
01|111165|2|1|Substitute for B3007-0016-2.36|Y
01|111170|1|1|*5-9pcs|Y
01|111170|2|1|*10+pcs|Y
01|111170|7|1|*5-9pcs|Y
01|111170|8|1|*10+pcs|Y
01|111170|13|1|*5-9pcs|Y
01|111170|14|1|*10+pcs|Y
01|111170|19|1|*5-9pcs|Y
01|111170|20|1|*10+pcs|Y
01|111170|25|1|*5-9pcs|Y
01|111170|26|1|*10+pcs|Y
01|111204|1|1|***Price is for 2pc in stock.|Y
01|111204|1|2|Additional quantities will need to be requoted.|Y
01|111204|1|3|(Pending)|Y
01|111210|1|1|**10pc min. Required|Y
01|111210|2|1|20pc-29pc pricing|Y
01|111210|3|1|30pc+ pricing|Y
01|111212|16|1|NCAT40-SF4-80|Y
01|111212|16|2|TOOL #S 14-17|Y
01|111221|1|1|This item is not a standard stock item for us and is|Y
01|111221|1|2|considered a special.  Once an order is placed it|Y
01|111221|1|3|cannot be cancelled or returned.|Y
01|111230|2|1|Substitute holder 32mm holder w/5/8 and7/8 collet|Y
01|111251|1|1|1600MM FACE PLATE 400MM THROUGH HOLE|Y
01|111251|1|2|ALPHA 21 CONTROL|Y
01|111251|1|3|TABLE CAN BE CONVERTED AT A LATER TIME TO INTEGRATE|Y
01|111251|1|4|WITH A CNC MILLING CENTER.|Y
01|111251|2|1|ANGLE PLATE FOR HORIZONTAL CONFIGURATION|Y
01|111261|1|1|Can be used for Speedio/TC-S2D/TC-S2C machines|Y
01|111262|1|1|Reference RGA# LVR-53128|Y
01|111262|1|2|Repair of MNL12-ER40Z s/n: A0107|Y
01|111262|1|3|(Alps# T32214)|Y
01|111262|2|1|Bearings O-rings Seals Collet Nut and Bearing Nut|Y
01|111262|2|2|to be replaced.|Y
01|111262|4|1|Repair of MNL12-ER40Z s/n: A0128|Y
01|111262|4|2|(Alps# T32214)|Y
01|111262|5|1|Bearings O-rings Seals Collet Nut and Bearing Nut|Y
01|111262|5|2|to be replaced.|Y
01|111272|13|1|Please Note: Retention knob price is based upon a|Y
01|111272|13|2|the purchase of the matching taper holder.|Y
01|111276|1|1|For NIKKEN Factory   JPY186780($1=JPY110)|Y
01|111276|1|2|Special NET price per HIRO|Y
01|111278|4|1|Tooling Incentive for Komatsu (No Charge to customer)|Y
01|111278|4|2|Lyndex-Nikken will issue a tooling certificate at time|Y
01|111278|4|3|of PO. (This is a no charge item)|Y
01|111283|1|1|Tooling Certificate #20880-2036-070218|Y
01|111293|1|1|Reference RGA# LVR-53305|Y
01|111293|1|2|Repair of MNL12-ER32Z s/n: A1496|Y
01|111293|1|3|(Alps# T32207)|Y
01|111293|2|1|Bearings O-rings Seals Collet Nut Drive Shaft and|Y
01|111293|2|2|Bearing Nut to be replaced|Y
01|111298|2|1|4 & 4A are the same per Nikken JP.|Y
01|111303|1|1|Reference RGA# LVR-53280|Y
01|111303|1|2|Repair of MSL12-ARH12-C-7MP s/n: A0044|Y
01|111303|1|3|(Alps# T32334)|Y
01|111303|2|1|Bearings O-rings Seals & Coolant Seals to be replaced|Y
01|111312|1|1|EXW Mundelein IL Prepaid upon Proforma|Y
01|111319|12|1|Offered as an in stock option|Y
01|111326|1|1|*Pricing based on 8pc order.|Y
01|111328|1|1|Alps #SS20-ECH7-45|Y
01|111328|1|2|Quoted at NET price.|Y
01|111338|1|1|PRICE IS NET TO CHAMPIONS MACHINE TOOL|Y
01|111338|1|2|ITEM IS A SPECIAL.  DEPOSIT AT TIME OF ORDER REQUIRED|Y
01|111338|2|1|External (Cutting Area) Cable Set|Y
01|111338|2|2|Length TBD|Y
01|111338|2|3|PRICE IS NET TO CHAMPIONS MACHINE TOOL|Y
01|111338|3|1|PRICE IS NET TO CHAMPIONS MACHINE TOOL|Y
01|111338|3|2|PRICE INCLUDES INSTALLAITON ALL TRAVEL COSTS MISC|Y
01|111338|3|3|ITEMS FOR PROFESSTIONAL INSTALL|Y
01|111345|7|1|INSTALLATION INCLUDES SERVO MOTOR 4TH AXIS DRIVE|Y
01|111345|7|2|FIBRE OPTICS CABLE CONNECTORS TRAVEL/LABOR|Y
01|111346|1|1|*Pricing based on 8pc order|Y
01|111352|1|1|7pcs ETA 1 week Remainder 3 TBD|Y
01|111352|2|1|ETA 1 week|Y
01|111364|2|1|7.08 FACEPLATE ON TABLE|Y
01|111364|3|1|7.87 FACEPLATE ON TABLE|Y
01|111364|6|1|MANUAL TAILSTOCK FOR CNC180 OR CNC202|Y
01|111364|10|1|6 3 JAW SCROLL CHUCK FOR CNC180 4TH AXIS TABLE|Y
01|111364|11|1|7 3 JAW SCROLL CHUCK FOR CNC202 4TH AXIS TABLE|Y
01|111364|14|1|EXTERNAL POWER/FEEDBACK CABLES FOR NIKKEN 4TH AXIS|Y
01|111365|11|1|HSK63A SK16 Major Dream High Speed 135GL|Y
01|111365|11|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111366|1|1|NT75-SK20Z-ICE Nakamura Live Z-axis 90Deg SK20|Y
01|111366|1|2|<STRAIGHT> 1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|1|3|Int/ Ext coolant 1015PSI;ref drwg# 00050601|Y
01|111366|1|4|Mimatic #189213|Y
01|111366|2|1|NT75-SK20Z-ICE Nakamura Live Z-axis 90Deg SK20|Y
01|111366|2|2|<STRAIGHT> 1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|2|3|Int/ Ext coolant 1015PSI;ref drwg# 00050601|Y
01|111366|2|4|Mimatic #189213|Y
01|111366|3|1|NT75-SK20Z-ICE Nakamura Live Z-axis 90Deg SK20|Y
01|111366|3|2|<STRAIGHT> 1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|3|3|Int/ Ext coolant 1015PSI;ref drwg# 00050601|Y
01|111366|3|4|Mimatic #189213|Y
01|111366|5|1|Nakamura Live Z-axis 90Deg SK20 <STRAIGHT>|Y
01|111366|5|2|1:1 Gear ratio; 70Nm; 6500RPM; Ext coolant;|Y
01|111366|5|3|ref drwg# 00050601|Y
01|111366|6|1|Nakamura Live Z-axis 90Deg SK20 <STRAIGHT>|Y
01|111366|6|2|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|6|3|Ext coolant;ref drwg# 00050601:  Mimatic #194494|Y
01|111366|7|1|Nakamura Live Z-axis 90Deg SK20 <STRAIGHT>|Y
01|111366|7|2|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|7|3|Ext coolant;ref drwg# 00050601:  Mimatic #194494|Y
01|111366|9|1|NT75-ER32Z-ICE/Mimatic #102771 Will change when ordered|Y
01|111366|9|2|Nakamura BMT75 Live Z-axis 90Deg ER32 <STRAIGHT>|Y
01|111366|9|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|9|4|Int/ Ext coolant 1015PSI;|Y
01|111366|9|5|ref drwg# 00050601 but ER32|Y
01|111366|10|1|NT75-ER32Z-ICE/Mimatic #102771 Will change when ordered|Y
01|111366|10|2|Nakamura BMT75 Live Z-axis 90Deg ER32 <STRAIGHT>|Y
01|111366|10|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|10|4|Int/ Ext coolant 1015PSI;|Y
01|111366|10|5|ref drwg# 00050601 but ER32|Y
01|111366|11|1|NT75-ER32Z-ICE/Mimatic #102771 Will change when ordered|Y
01|111366|11|2|Nakamura BMT75 Live Z-axis 90Deg ER32 <STRAIGHT>|Y
01|111366|11|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|11|4|Int/ Ext coolant 1015PSI;|Y
01|111366|11|5|ref drwg# 00050601 but ER32|Y
01|111366|13|1|NT75-ER40Z-ICE/Mimatic #102771 Will change when ordered|Y
01|111366|13|2|Nakamura BMT75 Live Z-axis 90Deg ER40 <STRAIGHT>|Y
01|111366|13|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|13|4|Int/Ext coolant 1015PSI;|Y
01|111366|13|5|ref drwg# 00050601 but ER40|Y
01|111366|14|1|NT75-ER40Z-ICE/Mimatic #102771 Will change when ordered|Y
01|111366|14|2|Nakamura BMT75 Live Z-axis 90Deg ER40 <STRAIGHT>|Y
01|111366|14|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|14|4|Int/Ext coolant 1015PSI;|Y
01|111366|14|5|ref drwg# 00050601 but ER40|Y
01|111366|15|1|NT75-ER40Z-ICE/Mimatic #102771 Will change when ordered|Y
01|111366|15|2|Nakamura BMT75 Live Z-axis 90Deg ER40 <STRAIGHT|Y
01|111366|15|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|15|4|Int/Ext coolant 1015PSI;|Y
01|111366|15|5|ref drwg# 00050601 but ER40|Y
01|111366|17|1|NT75-ER32Z/Mimatic #102771 Will change when ordered|Y
01|111366|17|2|Nakamura BMT75 Live Z-axis 90Deg ER32 <STRAIGHT>|Y
01|111366|17|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|17|4|Ext coolant 1015PSI;|Y
01|111366|17|5|ref drwg# 00050601 but ER32 external coolant|Y
01|111366|18|1|NT75-ER32Z/Mimatic #102771 Will change when ordered|Y
01|111366|18|2|Nakamura BMT75 Live Z-axis 90Deg ER32 <STRAIGHT>|Y
01|111366|18|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|18|4|Ext coolant 1015PSI;|Y
01|111366|18|5|ref drwg# 00050601 but ER32 external coolant|Y
01|111366|19|1|NT75-ER32Z/Mimatic #102771 Will change when ordered|Y
01|111366|19|2|Nakamura BMT75 Live Z-axis 90Deg ER32 <STRAIGHT>|Y
01|111366|19|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|19|4|Ext coolant 1015PSI;|Y
01|111366|19|5|ref drwg# 00050601 but ER32 external coolant|Y
01|111366|21|1|NT75-ER40Z/Mimatic #102771 Will change when ordered|Y
01|111366|21|2|Nakamura BMT75 Live Z-axis 90Deg ER40 <STRAIGHT>|Y
01|111366|21|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|21|4|Ext coolant 1015PSI;|Y
01|111366|21|5|ref drwg# 00050601 but ER40 external coolant|Y
01|111366|22|1|NT75-ER40Z/Mimatic #102771 Will change when ordered|Y
01|111366|22|2|Nakamura BMT75 Live Z-axis 90Deg ER40 <STRAIGHT>|Y
01|111366|22|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|22|4|Ext coolant 1015PSI;|Y
01|111366|22|5|ref drwg# 00050601 but ER40 external coolant|Y
01|111366|23|1|NT75-ER40Z/Mimatic #102771 Will change when ordered|Y
01|111366|23|2|Nakamura BMT75 Live Z-axis 90Deg ER40 <STRAIGHT>|Y
01|111366|23|3|1:1 Gear ratio; 70Nm; 6500RPM;|Y
01|111366|23|4|Ext coolant 1015PSI;|Y
01|111366|23|5|ref drwg# 00050601 but ER40 external coolant|Y
01|111369|1|1|Face Mount ER25 Adapter with 185mm Gage Length|Y
01|111369|1|2|Net price reflect minimum order of 100 holders.|Y
01|111369|2|1|Face Mount ER25 Adapter with 185mm Gage Length|Y
01|111369|2|2|Net price reflect minimum order of 200 holders.|Y
01|111369|3|1|Face Mount ER25 Adapter with 185mm Gage Length|Y
01|111369|3|2|Net price reflect minimum order of 400 holders.|Y
01|111369|4|1|Face Mount ER25 Adapter with 185mm Gage Length|Y
01|111369|4|2|Net price reflect minimum order of 1000 holders|Y
01|111378|2|1|Installation includes: Dual axis drive unit short bar|Y
01|111378|2|2|communications cables fiber optic cables bulkhead|Y
01|111378|2|3|cables external cables parameter changes service|Y
01|111378|2|4|time and travel.|Y
01|111387|1|1|Quote for Service Call to be performed at customer|Y
01|111387|1|2|on 2x NCT150A8 s/n: 1029 & 1059 by Jun Furukawa|Y
01|111387|1|3|from 3/13 - 3/14 (Including Transit Time)|Y
01|111387|1|4|PLEASE NOTE: This is an estimate only.|Y
01|111387|2|1|Transit Time: 10hrs x $100.00/hr = $1000.00|Y
01|111387|2|2|AirFare/Car Rental/Hotel/Meals: Approximately $1114.00|Y
01|111387|3|1|Minimum Service Charge 4hr Labor|Y
01|111387|3|2|Estimated 2 additional Hours of Labor.|Y
01|111397|2|1|*2 PC Pricing|Y
01|111397|11|1|*2 PC Pricing|Y
01|111397|20|1|*2 PC Pricing|Y
01|111409|1|1|Reference RGA# TAR-53273|Y
01|111409|1|2|NCT150LA21 s/n:1089|N
01|111411|5|1|POWER/FEEDBACK CABLE SET FOR ADDITIONAL AXIS(2 NEEDED)|Y
01|111411|7|1|INSTALLATION FEE INCLUDES THE FOLLOWING ITEMS:|Y
01|111411|7|2|FANUC ROTARY TABLE MOTOR (2pcs)DUAL AXIS AMPLIFIER|Y
01|111411|7|3|(4 + 1) BULKHEAD CONNECTORS HOSESINTERNAL WIRING|Y
01|111411|7|4|TRAVEL AND LABOR. ( MACHINE DATA SHEETS AND LADDER|Y
01|111411|7|5|INFORMATION WILL BE NEEDED).|Y
01|111415|1|1|MIM#194526:Special SK16 Live(90-Deg) MAZAK HQR|Y
01|111415|1|2|JPY239800($1=JPY110)|Y
01|111415|2|1|MIM#194526:Special SK16 Live(90-Deg) MAZAK HQR|Y
01|111415|2|2|JPY204600($1=JPY110)|Y
01|111415|3|1|MIM#194526:Special SK16 Live(90-Deg) MAZAK HQR|Y
01|111415|3|2|JPY192500($1=JPY110)|Y
01|111415|4|1|MIM#194526:Special SK16 Live(90-Deg) MAZAK HQR|Y
01|111415|4|2|JPY187000($1=JPY110)|Y
01|111415|5|1|MIM#194557:Special SK16 Live(Straight) MAZAK HQR|Y
01|111415|5|2|JPY152900($1=JPY110)|Y
01|111415|6|1|MIM#194557:Special SK16 Live(Straight) MAZAK HQR|Y
01|111415|6|2|JPY125400($1=JPY110)|Y
01|111415|7|1|MIM#194557:Special SK16 Live(Straight) MAZAK HQR|Y
01|111415|7|2|JPY116600($1=JPY110)|Y
01|111415|8|1|MIM#194557:Special SK16 Live(Straight) MAZAK HQR|Y
01|111415|8|2|JPY111100($1=JPY110)|Y
01|111415|9|1|MIM#194574:Special SK20 Live(Straight) MAZAK HQR|Y
01|111415|9|2|JPY152900($1=JPY110)|Y
01|111415|10|1|MIM#194574:Special SK20 Live(Straight) MAZAK HQR|Y
01|111415|10|2|JPY125400($1=JPY110)|Y
01|111415|11|1|MIM#194574:Special SK20 Live(Straight) MAZAK HQR|Y
01|111415|11|2|JPY116600($1=JPY110)|Y
01|111415|12|1|MIM#194574:Special SK20 Live(Straight) MAZAK HQR|Y
01|111415|12|2|JPY116600($1=JPY110)|Y
01|111415|13|1|MIM#A194607 SK16 Offset A(Right) for MAZAK HQR|Y
01|111415|13|2|JPY161700($1=JPY110)|Y
01|111415|14|1|MIM#A194610 SK16 Offset B(Left) for MAZAK HQR|Y
01|111415|14|2|JPY161700($1=JPY110)|Y
01|111415|15|1|MIM#A192492 SK20 Offset A(Right) for MAZAK HQR|Y
01|111415|15|2|JPY161700($1=JPY110)|Y
01|111415|16|1|MIM#A194609 SK20 Offset B(Left) for MAZAK HQR|Y
01|111415|16|2|JPY161700($1=JPY110)|Y
01|111416|5|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|111416|5|3|IF NEEDED/NEED TO CONFIRM|Y
01|111416|8|1|$1500 TOOL CERT FOR LIST PRICE LYNDEX NIKKEN V-FLANGE|Y
01|111416|8|2|HOLDERS.|Y
01|111419|1|1|Quated as net pricing no returnable no cancellable|Y
01|111419|2|1|Quated as net pricing no returnable no cancellable|Y
01|111440|1|1|NC5-46-SZF10C-90/wz PS-N46E|Y
01|111440|1|2|Quoted as net pricing non cancelable non returnable|Y
01|111440|2|1|wz PS-N46E|Y
01|111440|2|2|Quoted as net pricing non cancelable non returnable|Y
01|111440|3|1|wz PS-N46E|Y
01|111440|3|2|Quoted as net pricing non cancelable non returnable|Y
01|111440|5|1|Price is included in holder's|Y
01|111448|2|1|5AXZ-DD350F-RJ3|Y
01|111448|2|2|Include: Tilt Axis: Motor.Magnescale RU77|Y
01|111448|2|3|Inclide: Rotary Axis: MP Scale|Y
01|111448|2|4|Include: base frame stand for transportation|Y
01|111448|3|1|Without:Tilt Axis: Motor.Magnescale RU77|Y
01|111448|3|2|Without:Rotary Axis: MP Scale|Y
01|111448|3|3|Include: base frame stand for transportation|Y
01|111448|3|4|5AXZ-DD350F-RJ3|Y
01|111451|2|1|2pc+/each pricing*|Y
01|111453|1|1|Special HSK125A FMH per DWG (602439 REV B) part#TBD|Y
01|111453|1|2|Minimum quantity 2-pieces.|Y
01|111453|2|1|Special HSK125A FMH per DWG (602439 REV B) Part#TBD|Y
01|111453|3|1|Special HSK125A FMH per DWG (602439 REV B) Part#TBD|Y
01|111453|5|1|Special HSK125A FMH per DWG (602514 REV.B) Part#TBD|Y
01|111453|5|2|Minimum quantity 2-pieces.|Y
01|111453|6|1|Special HSK125A FMH per DWG (602514 REV.B) Part#TBD|Y
01|111453|7|1|Special HSK125A FMH per DWG (602514 REV.B) Part#TBD|Y
01|111457|1|1|Model#: WK-SW7-CAT50-ER32-0  Ref Drwg#: 00021839|Y
01|111457|1|2|Special Order. Unit price each. MOQ: 4|Y
01|111457|2|1|Adding Support 3 Pins|Y
01|111457|2|2|Special Order. Unit price each. MOQ: 4|Y
01|111457|5|1|Model#: WK-ZWS7-CAT50-ER32-0  Ref Drwg#: 00021836|Y
01|111457|5|2|Special Order. Unit price each. MOQ: 4|Y
01|111457|6|1|Adding Support 3 Pins|Y
01|111457|6|2|Special Order. Unit price each. MOQ: 4|Y
01|111470|1|1|Quoted as NET pricing|Y
01|111470|2|1|Quoted as NET pricing|Y
01|111470|3|1|Quoted as NET pricing|Y
01|111474|1|1|Reference RGA# LVR-53319|Y
01|111474|1|2|MZQT47-ER32X-OFF s/n: 36600 02 (Mim# 124034)|Y
01|111474|2|1|Bearings seals & o-rings must be replaced.|Y
01|111474|2|2|Labor is included.|Y
01|111495|3|1|Heidenhain scale +/-5 with scale mounting kit.|Y
01|111502|4|1|P/N: ISO4005-1375-5.87|Y
01|111502|4|2|ISO40 taper #3 tap holder w 5.87 gage length|Y
01|111504|1|1|TCE-94587|Y
01|111504|2|1|TCE-08133|Y
01|111522|3|1|Air Line Kit CNC202|Y
01|111522|4|1|Installation of NCTZ150FA-M On Fanuc Robodrill|Y
01|111522|4|2|Includes Cables/Drives/Fiber Optic/Parameter Input|Y
01|111522|4|3|Table must be 4th Ax Ready in order for L/N to install.|Y
01|111528|2|1|HA40L-ER32Z-ICE NET PRICE|Y
01|111528|3|1|HA40L-ER32X-ICE NET PRICE|Y
01|111528|6|1|HA40L-ER32Z-ICE NET PRICE|Y
01|111528|7|1|HA40L-ER32X-ICE NET PRICE|Y
01|111528|11|1|HA40L-ER32Z-ICE NET PRICE|Y
01|111528|12|1|HA40L-ER32X-ICE NET PRICE|Y
01|111528|73|1|This table is given in terms of NET pricing. No further|Y
01|111528|73|2|discount is to be taken|Y
01|111528|74|1|One full set of cables for the RT.|Y
01|111528|75|1|Swingbox|Y
01|111537|12|1|wrench for C5007-0032 and C5017-0032|Y
01|111557|5|1|COST IS NET TO ELLISON|Y
01|111557|5|2|PRICE INCLUDES SERVO AMPS AND ALL TRAVEL EXPENSES.|Y
01|111561|5|1|COST IS NET TO ELLISON|Y
01|111561|7|1|PRICE IS NET TO ELLISON|Y
01|111561|7|2|COST INCLUDE SERVO AMPS FOR ALL AXIS TRAVEL EXPENSES|Y
01|111561|7|3|AND MISC ITEMS FOR PROFESSIONAL INSTALLATION.|Y
01|111563|1|1|Dicount is for one time proof of concept|Y
01|111563|1|2|Holder is non-returnable|Y
01|111564|1|1|DIRECT REPLACEMENT FOR A21CONTROL AND MOTOR|Y
01|111564|1|2|NO MOTOR OR CONTROLLER|Y
01|111574|1|1|Reference RGA# TAR-53309|Y
01|111574|1|2|CNC180BFA s/n: 10356|N
01|111594|1|1|Howa Part# H011MC6 Y-3860|Y
01|111594|3|1|TBD|Y
01|111594|3|2|H011MC6 Y-3860 chuck body only|Y
01|111600|2|1|warranty replacement for defective motor originally|Y
01|111600|2|2|shipped on 5AX-130YA s/n: 5367 on Inv# 2190650|Y
01|111601|1|1|3pcs ETA aprox 6 weeks remainder ETA aprox 16 weeks|Y
01|111615|1|1|TCE-95971 (Feedback cable) for CNCZ180FA|Y
01|111615|1|2|REF: S/N20334T 20335T 20336T 20337T|Y
01|111615|1|3|Special Order. Unit price Each.|Y
01|111615|2|1|TCE-A3194 (Power/Signal cable) for CNCZ180FA|Y
01|111615|2|2|REF: S/N20334T 20335T 20336T 20337T|Y
01|111615|2|3|Special Order. Unit price Each.|Y
01|111615|5|1|for 5AX-201FA  S/N5347|Y
01|111615|6|1|for 5AX-201FA  S/N5347|Y
01|111615|7|1|for 5AX-201FA  S/N5347|Y
01|111615|8|1|for 5AX-201FA  S/N5347|Y
01|111632|1|1|Replaces old style SKN-10B(GH)|Y
01|111632|4|1|*Coolant Thru version|Y
01|111632|6|1|*Solid|Y
01|111644|6|1|Kennametal# 3747126   1.1/4 pilot|Y
01|111655|3|1|MORSE 2 TAPER|Y
01|111655|4|1|MORSE 2 LIVE CENTER|Y
01|111655|5|1|RISER FOR TAILSTOCKS. INCLUDES 18MM SLOT AND ALINGMENT|Y
01|111655|5|2|KEY FOR POITIONING OF TAILSTOCK|Y
01|111655|7|1|BRAIDED AIR LINE KIT.  INCLUDES AIR LINE TO ROTARY|Y
01|111655|7|2|TABLE AIR LINE TO TS VALVE AND AIR LINE TO TS.|Y
01|111655|7|3|ALSO INCLUDES ALL FITTINGS.|Y
01|111655|8|1|EXT POWER AND FEED BACK CABLE. STAINLESS STEEL BRAID|Y
01|111655|11|1|77266816 SMW AUTOBLOK PN|Y
01|111655|11|2|PBI-C 165 3J PNEU CHUCK FOR INDEXERS|Y
01|111655|11|3|SELF-CENTERING ROTATING CHUCK WITH A PNEUMATIC MANIFOLD|Y
01|111655|11|4|PBI-C:TONGUE & GROOVE MASTER JAWS|Y
01|111655|11|5|RADIAL JAW STROKE MM 3.6|Y
01|111655|11|6|MAX. OPERATING PRESSURE BAR 7|Y
01|111655|11|7|GRIPPING FORCE AT 6 BAR  KN 24|Y
01|111655|11|8|TORQUE MD NM 40|Y
01|111655|11|9|WEIGHT (WITHOUT TOP JAWS) KG 23|Y
01|111655|12|1|ENGADAPTER - SMW AUTOBLOK P/N|Y
01|111655|12|2|ENG AND MFG OF CHUCK ADAPTER PLATE|Y
01|111655|13|1|F5-24-2 - SMW AUTOBLOK P/N|Y
01|111655|13|2|AIR CONTROL VALVE 24V|Y
01|111655|13|3|AIR CONTROL VALVE TO AVTUATE TAILSTOCK AND CHUCKS|Y
01|111655|13|4|2 M COMMANDS REQUIRED|Y
01|111655|14|1|35760032 - SMW AUTOBLOK P/N|Y
01|111655|14|2|CHUCK ACTIVATION AND CLAMP CONFIRMATION MODULE|Y
01|111655|15|1|ENG JAWS FOR PART CARRIER 2 3/4|Y
01|111655|16|1|ENG JAWS FOR PART CARRIER 3 1/8|Y
01|111655|17|1|ENG JAWS FOR PART CARRIER 3 3/8|Y
01|111655|18|1|AXIAL WORK STOP PART CARRIER 2 3/4|Y
01|111655|18|2|WITH PART ALIGNMENT KEY|Y
01|111655|19|1|AXIAL WORK STOP PART CARRIER 3 1/8|Y
01|111655|19|2|WITH PART ALIGNMENT KEY|Y
01|111655|20|1|AXIAL WORK STOP PART CARRIER 3 3/8|Y
01|111655|20|2|WITH PART ALIGNMENT KEY|Y
01|111655|21|1|ENG SET UP RING PART CARRIER 2 3/4; 3 1/8; 3 3/8|Y
01|111655|22|1|NST 12-1 SINGLE T-NUT TYPE 2 M8 X 25|Y
01|111662|4|1|Inserts not included in Promo Package.|Y
01|111662|5|1|Inserts not included in Promo Package.|Y
01|111662|6|2|Inserts not included in Promo Package.|Y
01|111662|7|1|Inserts not included in Promo Package.|Y
01|111663|2|1|**Equipped with riser**|Y
01|111663|3|1|Installation includes: drive unit short bar fiber|Y
01|111663|3|2|optic cables communication cables bulk head cable|Y
01|111663|3|3|set external cable set parameter changes service|Y
01|111663|3|4|time and travel|Y
01|111669|1|1|Service call to be completed by 2 Technicians|Y
01|111669|1|2|5AXZ-DD350F s/n: 1008|Y
01|111669|1|3|Please note that prices are estimated.  Actual cost|Y
01|111669|1|4|will be determined once service call has been completed|Y
01|111669|2|1|Transit Time: 16 hours x $100/hr = $1600.00 (1 Person)|Y
01|111669|2|2|Airfare: $790.00 (1person)|Y
01|111669|2|3|Hotel: $130.00/night x 6 nights = $780.00|Y
01|111669|2|4|Meal: $50.00/day per tech x 6.5 Days = $325.00x2= $650|Y
01|111669|23|1|1 Technician from USA x 5 Days|Y
01|111669|24|1|1 Technician from Mexico Office x 5 Days|Y
01|111686|1|1|Reference RGA# TAR-53366|Y
01|111686|1|2|5AX-201 s/n: n/a|N
01|111692|1|1|in place of requested 6mm ER32 coolant collet|Y
01|111692|2|1|in place of requested 8mm ER32 coolant collet|Y
01|111692|3|1|in place of requested 10mm ER32 coolant collet|Y
01|111692|4|1|in place of requested 12mm ER32 coolant collet|Y
01|111718|3|1|P/N: H023M10-A6J|Y
01|111718|6|1|PENDING: If possible Howa can thread this at the|Y
01|111718|6|2|factory.|Y
01|111721|2|1|Non cancelable nor returnabel once ordered|Y
01|111721|4|1|S-HSK50A-SK10C-105P price and delivery is pending|Y
01|111721|5|1|Current Nikken Part CKFN32-32DC|Y
01|111721|5|2|Lead 3-4 weeks|Y
01|111721|5|3|Non cancelable nor returnable once ordered|Y
01|111724|1|1|**Special credit applied**|Y
01|111726|14|1|This will be with coolant ports|Y
01|111738|1|1|600MM table with Haas motor and cable set.|Y
01|111738|1|2|@@@ CORRECT P/N CNC-601YA-M @@@|Y
01|111738|8|1|80MM SUBPLATE FOR TAILSTOCK TO CENTERLINE OF TABLE|Y
01|111748|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111748|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111748|3|1|H63F-SF0312-3.15|Y
01|111748|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111749|1|1|Reference RGA# TAR-53580|Y
01|111749|1|2|5AX-130ZA s/n: 1696|N
01|111803|1|1|HSK125A-ER40-5.00-ID|Y
01|111803|1|2|HSK125A ER40 HiTorq Bearing Nut Collet Chuck ID chip|Y
01|111803|1|3|hole UNV#504|Y
01|111803|3|1|H125A-0500A-4.625-ID|Y
01|111803|3|2|HSK125A 1/2 End Mill Holder Aerospace|Y
01|111803|3|3|ID chip hole GKN UNV#463|Y
01|111803|5|1|H125A-0750A-5.75-ID|Y
01|111803|5|2|HSK125A 3/4 End Mill Holder Aerospace|Y
01|111803|5|3|ID chip hole GKN UNV#468|Y
01|111803|7|1|HSK125A-1000A-5.625-ID|Y
01|111803|7|2|HSK125A 1in End Mill Holder Aerospace|Y
01|111803|7|3|ID chip hole GKN UNV#472|Y
01|111803|9|1|HSK125A-1250A-5.625-ID|Y
01|111803|9|2|HSK125A 1.1/4 End Mill Holder Aerospace|Y
01|111803|9|3|ID chip hole GKN UNV#484|Y
01|111803|11|1|HSK125A-1500A-5.625-ID|Y
01|111803|11|2|HSK125A 1.1/2 End Mill Holder Aerospace|Y
01|111803|11|3|ID chip hole GKN UNV#274|Y
01|111803|13|1|HSK125A-2000A-5.50-ID|Y
01|111803|13|2|HSK125A 2in End Mill Holder Aerospace|Y
01|111803|13|3|ID chip hole GKN UNV#278|Y
01|111803|15|1|HSK125A-0375A-5.75-ID|Y
01|111803|15|2|HSK125A 3/8 End Mill Holder Aerospace|Y
01|111803|15|3|ID chip hole GKN#462|Y
01|111803|17|1|HSK125A 1 Stub Arbor Mill Holder|Y
01|111803|17|2|ID Chip Hole GKN UNV_451|Y
01|111803|17|3|Minimum Order 4 pieces.|Y
01|111803|21|1|H125A-SF0375-5.00-ID|Y
01|111803|21|2|HSK125A 3/8 Shrink Fit Holder ID chip hole|Y
01|111803|21|3|There might be overrun 1~2pcs at the end.|Y
01|111803|21|4|Minimum Order 4-Pieces|Y
01|111803|21|5|UNV#901>>No drawing provided by GKN|Y
01|111803|22|1|H125A-SF0375-5.00-ID|Y
01|111803|22|2|HSK125A 3/8 Shrink Fit Holder ID chip hole|Y
01|111803|22|3|Pricing reflects minimum order of 10 pieces.|Y
01|111803|22|4|UNV#901>>No drawing provided by GKN|Y
01|111803|24|1|H125A-SF0500-5.00-ID|Y
01|111803|24|2|HSK125A 1/2 Shrink Fit Holder ID chip hole|Y
01|111803|24|3|There might be overrun 1~2pcs at the end.|Y
01|111803|24|4|Minimum order 4 pieces|Y
01|111803|24|5|UNV#902>>No drawing provided by GKN|Y
01|111803|25|1|H125A-SF0500-5.00-ID|Y
01|111803|25|2|HSK125A 1/2 Shrink Fit Holder ID chip hole|Y
01|111803|25|3|Pricing reflects minimum order of 10 pieces.|Y
01|111803|25|4|UNV#902>>No drawing provided by GKN|Y
01|111803|27|1|H125A-SF0625-5.00-ID|Y
01|111803|27|2|HSK125A 5/8 Shrink Fit Holder ID chip hole|Y
01|111803|27|3|There might be overrun 1~2pcs at the end.|Y
01|111803|27|4|Minimum order 4 pieces.|Y
01|111803|27|5|UNV#903>>No drawing provided by GKN|Y
01|111803|28|1|H125A-SF0625-5.00-ID|Y
01|111803|28|2|HSK125A 5/8 Shrink Fit Holder ID chip hole|Y
01|111803|28|3|Pricing reflects minimum order of 10 pieces.|Y
01|111803|28|4|UNV#903>>No drawing provided by GKN|Y
01|111803|30|1|H125A-SF0750-5.00-ID|Y
01|111803|30|2|HSK125A 3/4 Shrink Fit Holder ID chip hole|Y
01|111803|30|3|There might be overrun 1~2pcs at the end.|Y
01|111803|30|4|Minimum Order 8 pieces|Y
01|111803|30|5|UNV#904>>No drawing provided by GKN|Y
01|111803|31|1|H125A-SF0750-5.00-ID|Y
01|111803|31|2|HSK125A 3/4 Shrink Fit Holder ID chip hole|Y
01|111803|31|3|Pricing reflects minimum order of 10 pieces.|Y
01|111803|31|4|UNV#904>>No drawing provided by GKN|Y
01|111803|33|1|H125A-SF1000-5.00-ID|Y
01|111803|33|2|HSK125A 1 Shrink Fit Holder ID chip hole|Y
01|111803|33|3|UNV#905>>No drawing provided by GKN|Y
01|111803|35|1|LN will provide a 10% random inspection of critical|Y
01|111803|35|2|features previously agreed upon by GKN.|Y
01|111803|35|3|An inspection report will be provided for this|Y
01|111803|35|4|sampling from the factory prior to shipment.|Y
01|111803|35|5|The inspection report will be used on all release|Y
01|111803|35|6|shipments from LN covered on the initial PO.|Y
01|111814|3|1|NC4011-22-4.00 2 PC PRICING|Y
01|111814|3|2|CAT40 Taper Plus 22mm Shell Mill|Y
01|111814|3|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111814|4|1|10 PC PRICING|Y
01|111814|4|2|NC4011-22-4.00|Y
01|111814|4|3|CAT40 Taper Plus 22mm Shell Mill|Y
01|111814|4|4|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111815|1|1|***Disregard Haas comment RT is Yaskawa***|Y
01|111815|1|2|***Machine: Hurco VMX 42i***|Y
01|111816|1|1|Tooling Certificate Number: 13195-2251-030119|Y
01|111821|1|1|Service Call by Jun Furukawa 2/20/2019 &|Y
01|111821|1|2|Gus Vazquez 2/25~2/26/2019|Y
01|111821|1|3|5AX-130 s/n: NA|Y
01|111821|2|1|Expenses Listed Below are for Jun Furukawa's Service|Y
01|111821|2|2|call on 2/20/19|Y
01|111821|2|3|Transit time: 2.5hrs x $100.00/hr = $250.00|Y
01|111821|2|4|Gas/Mileage: 120mi x 0.565/mi = $67.80|Y
01|111821|2|5|Meals: $50.00/Day x 1 Day = $50.00|Y
01|111821|3|1|Labor for Jun on 2/20/19|Y
01|111821|3|2|5.58hrs x $135.00/hr = $753.30|Y
01|111821|4|1|Expenses Listed Below are for Gus Vazquez's Service|Y
01|111821|4|2|call on 2/25~2/26/19|Y
01|111821|4|3|Transit time: 6.75hrs x $100.00/hr = $675.00|Y
01|111821|4|4|Gas/Mileage: 240mi x 0.565/mi = $135.60|Y
01|111821|4|5|Meals: $50/Day x 2 Day = $100.00|Y
01|111821|15|1|Labor for Gus 2/25~2/26/2019|Y
01|111821|15|2|14.75 hrs x $135.00/hr = $1991.25|Y
01|111821|16|1|Charges for Technician: Hiko on 2/26/19|Y
01|111821|17|1|Charges for Fanuc Technician Labor 2/25/2019|Y
01|111821|18|1|Charges for Fanuc Technician Labor 2/28~3/1/2019|Y
01|111823|2|1|Modification NET charge|Y
01|111830|1|1|*** Quantity 1-4pcs ***|Y
01|111830|2|1|*** Quantity 5-8pcs ***|Y
01|111830|3|1|*** Quantity 9+ pcs ***|Y
01|111834|1|1|5-9pc|Y
01|111834|2|1|10-19pc pricing|Y
01|111834|3|1|20+pc|Y
01|111834|9|1|5-9pc|Y
01|111834|10|1|10-19pc pricing|Y
01|111834|15|1|20+pc|Y
01|111843|6|1|Installation includes:Parameter changes and table|Y
01|111843|6|2|installaion utlizing factory drive units.|Y
01|111861|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111861|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111861|3|1|H63F-SF0312-3.15|Y
01|111861|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111865|3|1|DESIGN and ENGINEERING|Y
01|111866|2|1|Installation includes: Drive unit short br fiber|Y
01|111866|2|2|optic cable communications cable bulkhead cables|Y
01|111866|2|3|external cables parameter changes service time and|Y
01|111866|2|4|travel.|Y
01|111868|3|1|**Direct Chuck Nut for Coolant along the flutes|Y
01|111879|1|1|Reference RGA# CUR-53157|Y
01|111879|1|2|CAT40U-NX5-153 s/n: Mbzb-038|Y
01|111884|5|1|COmplete questionnaire to determine block|Y
01|111888|1|1|HSK63A-MDSK16-135PDB (Balluf pocket and balance)|Y
01|111888|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111888|1|3|Must Ship on customers UPS/FEDEX/DHL ACCT|Y
01|111888|1|4|Shipping from Nikken UK|Y
01|111888|3|1|If you choose PPD and ADD Frieghtthis is the charge|Y
01|111888|3|2|Will need to re-quote if qty changes|Y
01|111888|3|3|FRT is just for special holders shipping direct|Y
01|111896|7|1|Alternative to 3.13 GL5.00GL is in stock|Y
01|111900|1|1|For SK6|Y
01|111900|2|1|For SK10|Y
01|111901|1|2|Confirm with customer for Blank or Threaded Draw Nut|Y
01|111901|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111901|2|2|Howa Chuck|Y
01|111901|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|111901|3|2|QCFC Chuck|Y
01|111910|3|1|Non-standard stock can not be returned or cancelled|Y
01|111910|3|2|once a PO is received.|Y
01|111915|6|1|Quoted as NET pricing|Y
01|111920|1|1|HSK125A-ER40-5.00-ID|Y
01|111920|1|2|HSK125A ER40 HiTorq Bearing Nut Collet Chuck ID chip|Y
01|111920|1|3|hole UNV#504|Y
01|111920|3|1|H125A-0500A-4.625-ID|Y
01|111920|3|2|HSK125A 1/2 End Mill Holder Aerospace|Y
01|111920|3|3|ID chip hole GKN UNV#463|Y
01|111920|5|1|H125A-0750A-5.75-ID|Y
01|111920|5|2|HSK125A 3/4 End Mill Holder Aerospace|Y
01|111920|5|3|ID chip hole GKN UNV#468|Y
01|111920|7|1|HSK125A-1000A-5.625-ID|Y
01|111920|7|2|HSK125A 1in End Mill Holder Aerospace|Y
01|111920|7|3|ID chip hole GKN UNV#472|Y
01|111920|9|1|HSK125A-1250A-5.625-ID|Y
01|111920|9|2|HSK125A 1.1/4 End Mill Holder Aerospace|Y
01|111920|9|3|ID chip hole GKN UNV#484|Y
01|111920|11|1|HSK125A-1500A-5.625-ID|Y
01|111920|11|2|HSK125A 1.1/2 End Mill Holder Aerospace|Y
01|111920|11|3|ID chip hole GKN UNV#274|Y
01|111920|13|1|HSK125A-2000A-5.50-ID|Y
01|111920|13|2|HSK125A 2in End Mill Holder Aerospace|Y
01|111920|13|3|ID chip hole GKN UNV#278|Y
01|111920|15|1|HSK125A-0375A-5.75-ID|Y
01|111920|15|2|HSK125A 3/8 End Mill Holder Aerospace|Y
01|111920|15|3|ID chip hole GKN#462|Y
01|111920|17|1|HSK125A 1 Stub Arbor Mill Holder|Y
01|111920|17|2|ID Chip Hole GKN UNV_451|Y
01|111920|17|3|Minimum Order 4 pieces.|Y
01|111920|21|1|H125A-SF0375-5.00-ID|Y
01|111920|21|2|HSK125A 3/8 Shrink Fit Holder ID chip hole|Y
01|111920|21|3|There might be overrun 1~2pcs at the end.|Y
01|111920|21|4|Minimum Order 4-Pieces|Y
01|111920|21|5|UNV#901>>No drawing provided by GKN|Y
01|111920|22|1|H125A-SF0375-5.00-ID|Y
01|111920|22|2|HSK125A 3/8 Shrink Fit Holder ID chip hole|Y
01|111920|22|3|Pricing reflects minimum order of 10 pieces.|Y
01|111920|22|4|UNV#901>>No drawing provided by GKN|Y
01|111920|24|1|H125A-SF0500-5.00-ID|Y
01|111920|24|2|HSK125A 1/2 Shrink Fit Holder ID chip hole|Y
01|111920|24|3|There might be overrun 1~2pcs at the end.|Y
01|111920|24|4|Minimum order 4 pieces|Y
01|111920|24|5|UNV#902>>No drawing provided by GKN|Y
01|111920|25|1|H125A-SF0500-5.00-ID|Y
01|111920|25|2|HSK125A 1/2 Shrink Fit Holder ID chip hole|Y
01|111920|25|3|Pricing reflects minimum order of 10 pieces.|Y
01|111920|25|4|UNV#902>>No drawing provided by GKN|Y
01|111920|27|1|H125A-SF0625-5.00-ID|Y
01|111920|27|2|HSK125A 5/8 Shrink Fit Holder ID chip hole|Y
01|111920|27|3|There might be overrun 1~2pcs at the end.|Y
01|111920|27|4|Minimum order 4 pieces.|Y
01|111920|27|5|UNV#903>>No drawing provided by GKN|Y
01|111920|28|1|H125A-SF0625-5.00-ID|Y
01|111920|28|2|HSK125A 5/8 Shrink Fit Holder ID chip hole|Y
01|111920|28|3|Pricing reflects minimum order of 10 pieces.|Y
01|111920|28|4|UNV#903>>No drawing provided by GKN|Y
01|111920|30|1|H125A-SF0750-5.00-ID|Y
01|111920|30|2|HSK125A 3/4 Shrink Fit Holder ID chip hole|Y
01|111920|30|3|There might be overrun 1~2pcs at the end.|Y
01|111920|30|4|Minimum Order 8 pieces|Y
01|111920|30|5|UNV#904>>No drawing provided by GKN|Y
01|111920|31|1|H125A-SF0750-5.00-ID|Y
01|111920|31|2|HSK125A 3/4 Shrink Fit Holder ID chip hole|Y
01|111920|31|3|Pricing reflects minimum order of 10 pieces.|Y
01|111920|31|4|UNV#904>>No drawing provided by GKN|Y
01|111920|33|1|H125A-SF1000-5.00-ID|Y
01|111920|33|2|HSK125A 1 Shrink Fit Holder ID chip hole|Y
01|111920|33|3|UNV#905>>No drawing provided by GKN|Y
01|111920|35|1|LN will provide a 10% random inspection of critical|Y
01|111920|35|2|features previously agreed upon by GKN.|Y
01|111920|35|3|An inspection report will be provided for this|Y
01|111920|35|4|sampling from the factory prior to shipment.|Y
01|111920|35|5|The inspection report will be used on all release|Y
01|111920|35|6|shipments from LN covered on the initial PO.|Y
01|111932|1|1|Reference RGA# CUR-53329|Y
01|111932|1|2|C50FHM-ER32-215IC-110TP s/n: 95371 01 (Mim# 178139)|Y
01|111932|1|3|Option #1 (Recommended)|Y
01|111932|2|1|Replace CAT50 Input Spindle all coolant bushings|Y
01|111932|2|2|bearings seals and o-rings.|Y
01|111932|4|1|Reference RGA# CUR-53329|Y
01|111932|4|2|C50FHM-ER32-215IC-110TP s/n: 95371 01 (Mim# 178139)|Y
01|111932|4|3|Option #2|Y
01|111932|5|1|Cleaning up CAT50 Spindle replace coolant bushings|Y
01|111932|5|2|seals bearings and o-rings.|Y
01|111932|5|3|**Please note that we cannot warranty the repair if the|Y
01|111932|5|4|CAT50 Spindle is not replaced as recommended.|Y
01|111938|1|1|600MM table with Haas motor and cable set.|Y
01|111938|1|2|@@@ CORRECT P/N CNC-601YA-M @@@|Y
01|111938|1|4|PROJECT FOR GENERAL DYNAMICS MISSION SYSTEMS|Y
01|111938|1|5|MARION VA|Y
01|111938|8|1|80MM SUBPLATE FOR TAILSTOCK TO CENTERLINE OF TABLE|Y
01|111942|1|1|Tooling Certificate Number: 20275-|Y
01|111952|8|1|Wrench for CAT50-C2-125U-IDU|Y
01|111952|10|1|cross from 22947-8|Y
01|111952|13|1|Confirm size. As listed on Cline email as E40-862(C)|Y
01|111952|18|1|wrench for C5007-0040-4.00|Y
01|111952|20|1|cross from 22947-8|Y
01|111952|21|1|cross from 22947-8|Y
01|111952|35|1|wrench for C5017-0040-6.00|Y
01|111954|1|1|Reference RGA# TAR-53447|Y
01|111954|1|2|CNC180 s/n: 15546|N
01|111954|24|1|Expedite fee to try to have table completed and ready|Y
01|111954|24|2|for customer arranged pick up on 3/19/19 at 5pm CST.|Y
01|111955|5|1|Alternative to C4007-0032-3.13|Y
01|111968|1|1|Reference RGA# TAR-53448|Y
01|111968|1|2|TAT-105 s/n: LN-0006|N
01|111968|17|1|Expedite fee to try to have table completed and ready|Y
01|111968|17|2|for customer arranged pick up on 3/19/19 at 5pm CST.|Y
01|111978|1|1|P/N: OKE4-ER16-AD-ICE  194530|Y
01|111978|1|2|Okuma Live - BMT60; ADJ 107 deg; ER16; L1=63mm;|Y
01|111978|1|3|Lmax=110mm; 1:1 Gear ratio; 12Nm; 10000RPM; NO reversal|Y
01|111978|1|4|of rotation; Int/Ext Coolant 1015 PSI|Y
01|111978|1|5|Ref drwg:00051954 but for LB4000 machine interface|Y
01|111978|4|1|P/N: OKE4-ER25-15FA  Ref No: TBD|Y
01|111978|4|2|Okuma Live - BMT60; Fixed AGH 15 deg; ER25; L1=112mm|Y
01|111978|4|3|1:1 Gear ratio; 30Nm; 10000RPM; Reversal of rotation|Y
01|111978|4|4|direction; Int/Ext Coolant;|Y
01|111978|4|5|Ref drwg#00055388|Y
01|111980|1|1|Reference RGA# CUR-53322|Y
01|111980|1|2|Tool #1: CAT40U-NX5-153|Y
01|111980|10|1|Reference RGA# CUR-53322|Y
01|111980|10|2|Tool #2: CAT50U-NX5-151|Y
01|111989|1|1|Reference RGA# TOR-53347|Y
01|111989|1|2|CAT40-UMT200|Y
01|111989|4|1|2.5hrs of labor x $110.00/hr|Y
01|111995|1|1|Reference RGA# TOR-53394|Y
01|111995|1|2|PF-2|Y
01|112003|1|1|Reference RGA# TAR-53447|Y
01|112003|1|2|TAT-105 s/n: 1934-B|N
01|112003|17|1|Expedite fee to try to have table completed and ready|Y
01|112003|17|2|for customer arranged pick up on 3/19/19 at 5pm CST.|Y
01|112009|2|1|In stock option to out of stock 3.13 length|Y
01|112009|3|1|In stock substitution to out of stock shorer length|Y
01|112012|15|1|Alternate for ZKG12-5/16U|Y
01|112012|16|1|Alt for ZKG12-1/8PU|Y
01|112012|17|1|Alt for ZKG12-3/8U|Y
01|112012|18|1|Alt for ZKG12-1/8PU2|Y
01|112012|19|1|Alt for ZKG12-1/2U|Y
01|112015|1|1|SWAP MOTORS SENT BY DORIAN FOR CORRECT MOTORS FOR|Y
01|112015|1|2|5AX-201FA|Y
01|112015|2|1|INCLUDES WIRES AND CABLES|Y
01|112038|1|1|Reference RGA# TAR-53310|Y
01|112038|1|2|CNC180BFA s/n: 10361|N
01|112040|1|1|S-HSK50A-SK10C-105B|Y
01|112040|1|2|Item is a special and will not be cancelable nor will|Y
01|112040|1|3|is it returnable once the order is placed|Y
01|112041|1|1|Reference RGA# TAR-53241|Y
01|112041|1|2|5AX-2MT-105-120FA-M s/n: 8110 Having trouble with tilt|Y
01|112041|1|3|axis.|Y
01|112041|45|1|AX121R043: Dog Shaft|Y
01|112041|46|1|Grooves in rotary spindles must be re-plated and|Y
01|112041|46|2|re-ground.|Y
01|112045|1|1|Reference RGA# LVR-53371|Y
01|112045|1|2|Repair of customer's T32105 s/n: A0761|Y
01|112045|1|3|(Alps# T32105)|Y
01|112045|2|1|Bearings O-rings Seals Collet Nut and Spindle Shaft|Y
01|112045|2|2|to be replaced.|Y
01|112045|2|3|*** We will try to clean up the original spindle and|Y
01|112045|2|4|re-use; however we will not be able to tell if it will|Y
01|112045|2|5|be re-usable until assembled and test ran. If we are|Y
01|112045|2|6|able to re-use the price will be $828.00|Y
01|112045|4|1|Repair of customer's T32106 s/n: A1267|Y
01|112045|4|2|(Alps# T32106)|Y
01|112045|5|1|Bearings O-rings Seals Collet Nut Spindle Shaft and|Y
01|112045|5|2|Gears to be replaced.|Y
01|112049|1|1|Reference RGA# LVR-53402|Y
01|112049|1|2|MZQT5-ER40Z-ICE s/n: 32592 01 (Mim# 124877)|Y
01|112049|2|1|All bearings seals and o-rings must be replaced.|Y
01|112049|2|2|Includes labor.|Y
01|112058|1|1|Reference RGA# TAR-53306|Y
01|112058|1|2|5AX-130FA-M s/n: 3531|N
01|112060|1|1|Reference RGA# LVR-53405|Y
01|112060|1|2|Repair of customer's MYA03-11000 s/n: A0008|Y
01|112060|1|3|(Alps# MYA03-11000)|Y
01|112060|2|1|Bearings O-rings Seals collet nut spindle shaft|Y
01|112060|2|2|bevel gears with drive shaft and spur gears to be|Y
01|112060|2|3|replaced.|Y
01|112060|2|4|*** We will try to clean up the original spindle shaft|Y
01|112060|2|5|and gears and re-use; however. we will not be able to|Y
01|112060|2|6|tell if it will be re-useable until assembled and test|Y
01|112060|2|7|ran.|Y
01|112060|2|8|If we are able to re-use the price will be $2074.07|Y
01|112061|3|1|Due in 8/15|Y
01|112061|4|1|Due in 8/15|Y
01|112068|1|1|Part #T07594|Y
01|112068|2|1|Part #T07594|Y
01|112068|3|1|Part #T07594|Y
01|112112|1|1|NC5-46-FMH16-60 w/PS-123Air for non coolant use|Y
01|112112|1|2|This item is a special and is not cancellable nor|Y
01|112112|1|3|returnable once ordered|Y
01|112124|1|1|3 PC pricing|Y
01|112124|1|2|non-returnablenon-cancelable|Y
01|112125|2|1|13 PC pricing quoted as NET pricing|Y
01|112125|2|2|non-returnablenon-cancelable|Y
01|112145|2|1|Please Note: I am offering the ICE at the same price|Y
01|112145|2|2|as external coolant.|Y
01|112149|2|1|Please Note: I am offering the ICE at the same price|Y
01|112149|2|2|as external coolant.|Y
01|112157|3|1|In stock option to above back ordered item|Y
01|112186|43|1|Please Note: Discount reflected is limited to one|Y
01|112186|43|2|knob per tool holder purchased of the same taper.|Y
01|112189|4|1|NMTB30 will stick out of end because of draw bar style.|Y
01|112193|10|1|**Balance of orig request of H100A-SF16-160|Y
01|112193|13|1|*|Y
01|112199|4|1|RU77 Magnescale with scale adapter and mounting kit.|Y
01|112199|5|1|Sub plate with hydraulic porting for rotary union.|Y
01|112213|1|1|Includes Solenoid Block 2 Proximity Switches|Y
01|112213|1|2|Includeds Air lines and fittings|Y
01|112216|1|1|OD=20mm ID=1/4 Large Chamfered Edge|Y
01|112216|2|1|OD=20mm ID=1/4 Large Chamfered Edge|Y
01|112221|16|1|Labor for NC5 repair in the case of nomal use|Y
01|112221|16|2|Additional cost may be charged in the case of|Y
01|112221|16|3|unexpected use or condition.|Y
01|112221|16|4|No Discount less than 5pcs 10% for 5-9pcs|Y
01|112221|16|5|20% for 10-19pcs 30% for 20pcs-|Y
01|112221|19|1|NC5-46 Assembly Fixture|Y
01|112221|19|2|Includes NC5-46 Tapering Gauge Load cell Transducer|Y
01|112221|19|3|and NC5 Measuring instrument|Y
01|112221|19|4|Need to agree Non Disclosure Agreement(NDA) in advance|Y
01|112221|19|5|Quoted as net pricing non-cancelable non-returnable|Y
01|112226|2|1|**20pc Min Pricing|Y
01|112228|1|1|Net price reflects 1~4 angle heads.|Y
01|112228|3|1|Net price reflects 5~9 angle heads.|Y
01|112228|3|2|6p: 5-6wks Bal: 7-8wks|Y
01|112228|5|1|Net price reflects 10+ angle heads.|Y
01|112228|5|2|6p: 5-6wks Bal: 7-8wks|Y
01|112231|2|1|Single Output ER32 Right Angle Head|Y
01|112231|3|1|Twin Spindle ER32 Output Right Angle Head|Y
01|112231|4|1|Approximate Cost of Positioning Block|Y
01|112231|4|2|Must consult engineering with spindle information|Y
01|112231|4|3|before approving order to be made and shipped.|Y
01|112258|2|1|*to hold 1/16 (1.59mm)|Y
01|112258|3|1|*to hold 3/32 (2.38mm)|Y
01|112266|1|1|NSVX400TMA No motor includes 8+1 RJ|Y
01|112285|1|1|CNC180-2W-250SA-BR2|Y
01|112285|1|2|Special Base plate Direct Cable Junction Cable|Y
01|112285|1|3|Center divider Junction Box are included|Y
01|112285|1|4|Air +2wk $2500 for freight Boat +6wks|Y
01|112285|2|1|CNC180-BR2 Right & Left (2 CNC Tables set)|Y
01|112285|2|2|Specail Base Plate Direct Cable Junction Cable|Y
01|112285|2|3|Center Divider Junction Box are included|Y
01|112289|4|1|RU77 Magnescale with scale adapter and mounting kit.|Y
01|112289|5|1|Sub plate with hydraulic porting for rotary union.|Y
01|112297|2|1|Warranty replacement for 3x SKN-10K sent Inv# 2204319|Y
01|112297|2|2|Inv# 2211462 & Inv# 2216569.|Y
01|112308|1|1|Single Output X Axis Live Tools with SK20 Output|Y
01|112308|2|1|Single Output Z Axis Live Tools with SK20 Output|Y
01|112308|4|1|BMT65-SK20Z-MS|Y
01|112308|4|2|DELIVERY TBD FROM FACTORY|Y
01|112308|4|3|NET PRICING; ADD YOUR MARGIN TO QUOTE FOR CUSTOMER|Y
01|112308|6|1|BMT65-ER25Y-MD|Y
01|112308|6|2|DELIVERY TBD FROM FACTORY|Y
01|112308|8|1|BMT65-SK16X-HS|Y
01|112308|8|2|DELIVERY TBD FROM FACTORY|Y
01|112323|1|1|Tooling Certificate Number: 13435-1138-030818|Y
01|112323|3|1|*Special - Non-returnable/Non-Cancelable|Y
01|112323|6|1|*Special - Non-returnable/Non-Cancelable|Y
01|112325|1|1|HO37M6-M-1379 (Soft Jaws for 6000RPM)|Y
01|112325|2|1|Orders received by 4/15 will arrive 4/29 week|Y
01|112325|3|1|Orders received by 4/15 will arrive 4/29 week|Y
01|112330|1|1|Tooling Certificate Number: 13687-2060-080718|Y
01|112362|2|1|PART # ABOVE REFLECTS MOST CURRENT MODEL TABLE AND|Y
01|112362|2|2|SERVO MOTOR. EXTERNAL CABLES NOT INCLUDED|Y
01|112362|2|3|OSP4 REPLACED OSP3 WIITH CONTROL OSP CONTROL CHANGE|Y
01|112363|1|1|Non standard special item is not cancelable nor|Y
01|112363|1|2|returnable once the order is placed|Y
01|112363|1|3|Please confirm DIN is required|Y
01|112366|1|1|*replaces part S1005-0875-9.05|Y
01|112373|1|1|BMT65-ER20-AD|Y
01|112383|1|1|P/N: MZMP46-ER32X-OFF-HS-ICE  Mim#192489|Y
01|112383|1|2|Mazak Live X-axis Ver Str ER32 Offset <V-Type>|Y
01|112383|1|3|1:2 Gear ratio; n1=5750 RPM n2=11500RPM; 40Nm;|Y
01|112383|1|4|Central offset V=50mm; L=97mm; Int/Ext Coolant 1015 PSI|Y
01|112383|1|5|ref drwg#00054333|Y
01|112383|2|1|P/N: MZMP46-ER32X-OFF-HS Mim#192490|Y
01|112383|2|2|Mazak Live X-axis Ver Str ER32 Offset <V-Type>;|Y
01|112383|2|3|1:2 Gear n1=5750 RPM; n2=11500RPM;40Nm;|Y
01|112383|2|4|Central Offset V=50mm; L= 97mm; Ext Coolant 1051 PSI;|Y
01|112383|2|5|ref drwg# 00054327|Y
01|112383|3|1|P/N: MZMP46-SK20X-OFF-HS-ICE  Mim#102771 will change|Y
01|112383|3|2|when ordered.|Y
01|112383|3|3|Mazak Live X-axis Ver Str SK20 Offset <V-Type>|Y
01|112383|3|4|1:2 Gear; n1=5750 RPM n2=11500RPM; 40Nm|Y
01|112383|3|5|Central Offset V=50mm; L=106mm;|Y
01|112383|3|6|Int/ Ext Coolant 1015 PSI|Y
01|112383|3|7|ref drwg #00054333 tooling interface ref# 00054307|Y
01|112383|7|1|P/N: MZMP46-SK20X-OFF-HS  Mim#102771 Will change when|Y
01|112383|7|2|ordered.|Y
01|112383|7|3|Mazak Live X-axis Ver Str SK20 Offset <V-Type>|Y
01|112383|7|4|1:2 Gear; n1=5750 RPM n2=11500RPM 40Nm;|Y
01|112383|7|5|Central Offset V=50mm L=106mm;|Y
01|112383|7|6|Ext Coolant 1015 PSI|Y
01|112383|7|7|ref drwg # 00054327 tooling interface ref# 00054307|Y
01|112400|1|1|10-19pc pricing|Y
01|112400|2|1|20+pc|Y
01|112400|7|1|5+pc minimum*|Y
01|112400|9|1|5+pc minimum*|Y
01|112400|13|1|5+pc minimum*|Y
01|112400|17|1|5+pc minimum*|Y
01|112400|18|1|10-19pc pricing|Y
01|112400|22|1|5+pc minimum*|Y
01|112400|24|1|5+pc minimum*|Y
01|112400|25|1|10-19pc pricing|Y
01|112400|29|1|5+pc minimum*|Y
01|112400|33|1|5+pc minimum*|Y
01|112400|37|1|5+pc minimum*|Y
01|112400|41|1|5+pc minimum*|Y
01|112400|49|1|10-19pc pricing|Y
01|112400|50|1|20-29pc pricing|Y
01|112400|51|1|30+pc pricing|Y
01|112400|55|1|10-19pc pricing|Y
01|112400|56|1|20-29pc pricing|Y
01|112428|1|1|Tooling Certificate Number: E8165-2273-032019|Y
01|112433|1|1|Reference RGA# LVR-52368|Y
01|112433|1|2|Tool #2: OKL3-ER32X s/n: NA|Y
01|112433|2|1|Spindle/gears collet nut bearings seals and o-rings|Y
01|112433|2|2|must all be replaced.|Y
01|112433|2|3|Labor is included.|Y
01|112442|10|1|Must be ordered with holders to recieve promo price|Y
01|112446|1|1|A completed Presetter Qualification Form must be|Y
01|112446|1|2|submitted in order for a purchase order to be processed|Y
01|112446|1|3|Once these items are shipped/invoiced they may not be|Y
01|112446|1|4|returned.|Y
01|112452|2|1|Sigma 5 motors and Haas Cables|Y
01|112456|8|1|SKJ25-23.5 SK25 Slotted Disc 23.5mm|Y
01|112478|1|1|Tooling Certificate Number: 13687-2000-050418|Y
01|112495|1|1|BMT65-ER20-AD|Y
01|112503|1|1|PS-802 (40pcs stock @ Nikken)|Y
01|112511|1|1|Mimatic Part #194587 BT50; AGH; ER32;A=110mm/ d=28mm;|Y
01|112511|1|2|Int coolant through spindle ext coolant through pipe;|Y
01|112511|1|3|Reversal of rotation direction;|Y
01|112511|1|4|1:1 Gear; 70Nm; 6500RPM;Ref drwg# 00046179 but internal|Y
01|112511|1|5|coolant.|Y
01|112511|3|1|Mimatic Part # TBD BT50; AGH; ER40;A=110mm/ d=28mm;|Y
01|112511|3|2|Int coolant through spindle ext coolant through pipe;|Y
01|112511|3|3|Reversal of rotation direction;1:1 Gear; 150Nm; 5000RPM|Y
01|112511|3|4|Ref drwg# 00044242 but internal coolant.|Y
01|112513|2|1|Warranty replacement for defective collet shipped out|Y
01|112513|2|2|on Inv# 2213082|Y
01|112517|1|1|S.N-150|Y
01|112517|1|2|Machine Vice|Y
01|112517|1|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112527|1|1|C5007-1000-3.50DIN Holders and we will plug the DIN|Y
01|112527|1|2|holes.|Y
01|112533|1|1|Reference RGA# TAR-53279|Y
01|112533|1|2|5AX-500FA-APC s/n: 1007|N
01|112566|1|1|Warranty replacement for defective collet shipped on|Y
01|112566|1|2|Inv# 2213593|Y
01|112566|2|1|Reference RGA# QUA-53341|Y
01|112568|3|1|SST3/4-ECH7S-70|Y
01|112568|3|2|Straight Shank Ext Floating Tap Holder 3/4|Y
01|112583|1|1|PF-RMSS-10.5 (Standard)|Y
01|112583|1|2|Tolerance +0.021/+0.016    3pcs stock in Japan.|Y
01|112583|3|1|PF-RMSS-10.5 (Special)|Y
01|112583|3|2|Tolerance +0.003/-0.002   Special Order.|Y
01|112583|4|1|PF-RMSS-10.5 (Special)|Y
01|112583|4|2|Tolerance +0.003/-0.002   Special Order.  MOQ:100+|Y
01|112595|5|1|16 3 JAW STEEL BODY CHUCK PACKAGE.|Y
01|112595|5|2|PACAKGE INCLUDES 16 3 JAW SET TRU CHUCK 2 PC JAWS|Y
01|112595|5|3|FINISHED ADAPTER PLATE T-NUTS MOUNTING BOLTS AND|Y
01|112595|5|4|ASSEMBLY DRAWING. CHUCK THROUGH HOLE 5.3543 DIA|Y
01|112595|7|1|PRICE IS NET TO DMG MORI|Y
01|112595|7|2|PRICE INCLUDES SERVO MOTOR ALL TRAVEL EXPENSES AND|Y
01|112595|7|3|MISC ITEMS FOR PROFESSIONAL INSTALL.|Y
01|112596|7|1|PRICE IS NET TO DMG MORI|Y
01|112596|7|2|PRICE INCLUDES SERVO AMP ALL TRAVEL EXPENSES AND|Y
01|112596|7|3|MISC ITEMS FOR PROFESSIONAL INSTALL.|Y
01|112599|1|1|Mimatic Part #194593 HSK63A; AGH 3/4 SM arbor;|Y
01|112599|1|2|A=65mm; d=18mm; L=187mm;; L1=80mm;|Y
01|112599|1|3|Central coolant through spindle ext coolant over pipe;|Y
01|112599|1|4|Reversal of rotation direction;1:1 gear ratio; 70Nm;|Y
01|112599|1|5|6500RPM;ref drwg# 00055436|Y
01|112599|2|1|Mimatic Part #194593 ref drwg# 00055436|Y
01|112599|3|1|Mimatic Part #194593 ref drwg# 00055436|Y
01|112599|4|1|Mimatic Part #194593 ref drwg# 00055436|Y
01|112599|5|1|Mimatic Part #194593 ref drwg# 00055436|Y
01|112599|6|1|Mimatic Part #194593 ref drwg# 00055436|Y
01|112599|7|1|Mimatic Part #194593 ref drwg# 00055436|Y
01|112599|10|1|Mimatic Part #194591 Capto C6; AGH; 3/4 SM arbor;|Y
01|112599|10|2|A=65mm; d=18mm; L=187mm; L1=80mm;|Y
01|112599|10|3|Central coolant through spindle ext coolant over pipe;|Y
01|112599|10|4|Reversal of rotation direction;|Y
01|112599|10|5|1:1 gear ratio; 70Nm; 6500RPM;|Y
01|112599|10|6|ref drwg# 00055435|Y
01|112599|11|1|Mimatic Part #194591 ref drwg# 00055435|Y
01|112599|12|1|Mimatic Part #194591 ref drwg# 00055435|Y
01|112599|13|1|Mimatic Part #194591 ref drwg# 00055435|Y
01|112599|14|1|Mimatic Part #194591 ref drwg# 00055435|Y
01|112599|15|1|Mimatic Part #194591 ref drwg# 00055435|Y
01|112599|16|1|Mimatic Part #194591 ref drwg# 00055435|Y
01|112599|19|1|Mimatic Part #194589 HSK63A; AGH; MI50;|Y
01|112599|19|2|A=65mm; d=18mm; L=187mm;; L1=80mm;|Y
01|112599|19|3|Central coolant through spindle ext coolant over pipe;|Y
01|112599|19|4|Reversal of rotation direction;|Y
01|112599|19|5|1:1 gear ratio; 70Nm; 6500RPM;|Y
01|112599|19|6|ref drwg# 00055430|Y
01|112599|22|1|Mimatic Part #194590 Capto C6; AGH; MI50;|Y
01|112599|22|2|A=65mm; d=18mm; L=187mm; L1=80mm;|Y
01|112599|22|3|Central coolant through spindle ext coolant over pipe;|Y
01|112599|22|4|Reversal of rotation direction;|Y
01|112599|22|5|1:1 gear ratio; 70Nm; 6500RPM;|Y
01|112599|22|6|ref drwg# 00055434|Y
01|112599|23|1|Mimatic Part#194590ref drwg# 00055434|Y
01|112599|24|1|Mimatic Part #194590ref drwg# 00055434|Y
01|112599|25|1|Mimatic Part #194590ref drwg# 00055434|Y
01|112599|26|1|Mimatic Part #194590ref drwg# 00055434|Y
01|112599|27|1|Mimatic Part #194590ref drwg# 00055434|Y
01|112599|28|1|Mimatic Part #194590ref drwg# 00055434|Y
01|112612|1|1|3Q43191564 / 1009A8-12|Y
01|112615|2|1|P/N: NCAT50-FMH22-47-200|Y
01|112615|2|2|Dual Contact CAT50 22mm Shell Mill Holder w 200mm g.l.|Y
01|112629|1|1|Reference RGA# LVR-53459|Y
01|112629|1|2|Repair of MNL12-ER32Z-MS s/n: A0130 (T32216)|Y
01|112629|2|1|Spindle shafts bevel gears collet nuts bearing nut|Y
01|112629|2|2|bearings seals & o-rings.|Y
01|112629|2|3|Labor is included.|Y
01|112630|1|1|Reference RGA# TAR-53358|Y
01|112630|1|2|5AX-2002FA s/n: 1652|N
01|112630|34|1|Freight charges: from C & A Tool to Lyndex.|Y
01|112630|34|2|C & A Tool Engineering Inc. is responsible for all|Y
01|112630|34|3|freight charges. Cost is $194.67.|Y
01|112637|1|1|Spec: 2.75L 1.30L1 1.34D 75TG-NUT(B) 75TG-SPAN G2.5|Y
01|112637|1|2|24000RPM|Y
01|112640|2|1|Set Screw for  BT35-WE5/8-60 Holder = S9/16-12X1/2|Y
01|112640|2|2|Please locate a nearby supplier $5.00 list plus|Y
01|112640|2|3|shipping is not cost effective.|Y
01|112642|1|1|Reference RGA# LVR-53431|Y
01|112642|1|2|OKLB15M-ER32Z s/n: A0236 (OK101-10002)|Y
01|112642|2|1|Clutch collet nut lock washer bearings seals &|Y
01|112642|2|2|o-rings must all be replaced.|Y
01|112642|2|3|Labor is included.|Y
01|112649|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112649|1|2|(1) PC pricing|Y
01|112649|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112649|2|2|(3) PC Pricing|Y
01|112649|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112649|3|2|(8) PC pricing|Y
01|112671|2|1|NET PRICE|Y
01|112678|1|1|C6 TEST BAR  Max Lenght:388mm  Dia:40mm Length:315mm|Y
01|112678|1|2|Special Order. Net Price Each.|Y
01|112678|2|1|C6-Testbar w 40mm Diameter and 325mm gage length|Y
01|112678|2|2|Special Order. Net Price Each|Y
01|112684|2|1|In stock option offered at same price as non coolant|Y
01|112684|2|2|If the cutter tool is NOT coolant thru this will work|Y
01|112696|1|1|Reference RGA# TOR-53438|Y
01|112696|1|2|Repair of NCAT50-C1.1/4-90U|Y
01|112697|2|1|200mm Faceplate with T-Slots for NCT200 Rotary Table|Y
01|112697|3|1|4th Axis External Power/Feedback Cables|Y
01|112700|1|1|E68B-ISO50|Y
01|112700|2|1|E68BA-ISO50|Y
01|112700|3|1|E68L-ISO50|Y
01|112700|4|1|E68LA-ISO50|Y
01|112708|11|1|POWER FEEDBACK CABLES|Y
01|112718|1|1|1pc 1-2 Weeks Delivery 2+ pcs 18-20 Weeks MFG plus|Y
01|112718|1|2|Transit time|Y
01|112718|2|1|1pc 1-2 Weeks Delivery 2+ pcs 18-20 Weeks MFG plus|Y
01|112718|2|2|Transit time|Y
01|112727|2|1|Turned down per print provided by customer|Y
01|112727|2|2|Installed with BIS-C-122-04/L Balluff Chips.|Y
01|112727|2|3|Customer is responsible for balancing as assembly|Y
01|112727|2|4|after receipt of tool holders.|Y
01|112727|2|5|**SPECIALS- these are non-returnable and cannot be|Y
01|112727|2|6|cancelled upon receipt of PO**|Y
01|112727|2|7|*net price|Y
01|112727|3|1|Installed on special H32E-SF10-75-IDI|Y
01|112727|3|2|*net price|Y
01|112727|9|1|*net price|Y
01|112735|2|1|One time discount per F/U to order 3654891ZBAA|Y
01|112735|3|1|Tim Reeves to work with customer for proper block|Y
01|112737|1|1|Reference RGA# TAR-53395|Y
01|112737|1|2|CNC401T s/n: 11228|N
01|112740|1|1|Tooling Certificate Number: 8112-1153-032318|Y
01|112753|5|1|Will need to confirm Price and DeliveryWill Advise|Y
01|112756|3|1|This length will be available sooner than the 5 length|Y
01|112770|2|1|External Power and Feedback Cables for 4th Axis|Y
01|112797|1|1|1 Table Only includes rotary table 2x motors and|Y
01|112797|1|2|rotary table cables|Y
01|112797|1|3|Does not include amps b-axis cables junction box|Y
01|112797|1|4|junction box cable and center divider|Y
01|112798|1|1|ITEM IS A SPECIAL.  DEPOSIT AT TIME OF ORDER REQUIRED|Y
01|112798|2|1|External (Cutting Area) Cable Set|Y
01|112798|2|2|Length TBD|Y
01|112798|3|1|PRICE INCLUDES SERVO AMP INSTALLAITON MISC ITEMS|Y
01|112801|3|1|To plug DIN|N
01|112812|1|1|Promo Discount Only|Y
01|112814|3|1|Torque: 4~6mm 29-36ft-lbs/8~10mm 40-47ft-lbs|Y
01|112814|3|2|12mm 47-55ft-lbs|Y
01|112814|43|1|for 3/4 Milling Chuck|Y
01|112819|1|1|Special pricing for Comstock Ind.|Y
01|112819|1|2|Onetime pricing only - non-returnable|Y
01|112819|5|1|Pricing reflects special discount for Comstock Ind.|Y
01|112819|5|2|One time pricing only non-returnable|Y
01|112830|7|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112830|8|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112830|10|1|1pc stock remainder ETA aprox 1-2 weeks|Y
01|112830|13|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112830|14|1|NBT50-SK25C-165|Y
01|112830|14|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112830|15|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112830|15|2|NBT50-SK25C-195|Y
01|112830|16|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112830|16|2|NBT50-SK25C-250|Y
01|112830|17|1|NBT50-C1.1/4-90|Y
01|112830|17|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112830|17|3|DELETE TO LONG LEAD TIME|Y
01|112830|18|1|NBT50-C2-105|Y
01|112830|18|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112830|18|3|DELETE TO LONG LEAD TIME|Y
01|112830|47|1|NBT50-FMH25.4-70-45|Y
01|112830|47|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112830|48|1|NBT50-FMH31.75-76-45|Y
01|112830|48|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112830|49|1|NBT50-FMH38.1-100-45|Y
01|112830|49|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112842|1|1|Reference RGA# TAR-53430|Y
01|112842|1|2|5AX-2002 s/n: 1557|N
01|112844|3|1|External Cable Set|Y
01|112852|2|1|Warranty replacement for defective unit shipped out|Y
01|112852|2|2|on inv# 2193951|Y
01|112852|2|3|Customer has been advised to scrap the original|Y
01|112852|2|4|defective collet.|Y
01|112863|1|1|CAT45-SF1000-8.00CP|Y
01|112863|2|1|CAT45-SF1000-6.00CP|Y
01|112863|3|1|CAT45-SF1000-4.00CP|Y
01|112863|4|1|CAT45-SF0750-6.00CP|Y
01|112863|5|1|CAT45-SF0625-6.00CP|Y
01|112865|5|1|Installation includes: drive unit short bar fiber|Y
01|112865|5|2|optic cables communication cables bulk head cable|Y
01|112865|5|3|set external cable set parameter changes service|Y
01|112865|5|4|time and travel|Y
01|112868|2|1|2.1/4 length not availthis is closest substitute|Y
01|112878|1|1|MNL12-CAPTO4X-C Mori Live X-axis Str CAPTO4<Radial>|Y
01|112878|1|2|Internal Coolant|Y
01|112878|1|3|Item is considered non standard stock special and is|Y
01|112878|1|4|not cancelable nor returnable once ordered|Y
01|112878|1|5|Given in terms of NET PRICE|Y
01|112878|4|1|MNL12-CAPTO5X-C Mori Live X-axis Str CAPTO5 <RADIAL>|Y
01|112878|4|2|Internal coolant|Y
01|112878|4|3|Given in terms of NET PRICE|Y
01|112878|5|1|MNL12-CAPTO5Z-CMori Live Z-axis 90Deg CAPTO5 <AXIALL>|Y
01|112878|5|2|Internal coolant|Y
01|112878|5|3|Given in terms of NET PRICE|Y
01|112881|1|1|Reference RGA# TAR-53442|Y
01|112881|1|2|CNCZ180 s/n: 12186|N
01|112882|1|1|MOQ=3pc|Y
01|112883|2|1|Includes drive unit external cables interface cables|Y
01|112883|2|2|short bar fiber optic cable communications cable|Y
01|112883|2|3|travel labor expenses|Y
01|112883|2|4|Note: Machine data sheets need to be provided before|Y
01|112883|2|5|install some software/ladder upgrades from Fanuc may|Y
01|112883|2|6|be necessary|Y
01|112891|9|1|Delivery pending minimum 16 weeks|Y
01|112895|1|1|4pcs in Stock at factory that can be converted to the|Y
01|112895|1|2|Hi-Speed Coolant version. Balance 1pc would be aprox|Y
01|112895|1|3|15-16 weeks lead time.|Y
01|112895|2|1|Good stock at factory. ETA 1 week ARO|Y
01|112895|3|1|Good stock in IL warehouse.|Y
01|112906|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112911|1|1|100 NM|Y
01|112911|1|2|ACCEPTS ANY CAT40 TOOL HOLDER|Y
01|112911|2|1|1 IN STOCK|Y
01|112911|2|2|1 IN 20 WEEKS|Y
01|112911|2|3|100 NM|Y
01|112911|2|4|ER40 ONLY|Y
01|112917|1|1|Discount reflects a purchase order of 1~25 holders.|Y
01|112917|2|1|Discount reflects a purchase order of 25+ holders.|Y
01|112926|5|1|Installation includes: drive unit short bar fiber|Y
01|112926|5|2|optic cables communication cables bulk head cable|Y
01|112926|5|3|set external cable set parameter changes service|Y
01|112926|5|4|time and travel|Y
01|112947|22|1|Older style holder all sales are final!|Y
01|112947|23|1|Older style holder all sales are final!|Y
01|112952|1|1|No tooling certificate max 40% discount includes|Y
01|112952|1|2|1x set of 2x tables|Y
01|112952|3|1|1000PSI Max|Y
01|112972|1|1|****warranty on replacement parts is 1 year****|Y
01|112981|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|112981|1|2|KM42-24.95|Y
01|112987|10|1|This product is given in terms of NET pricing.|Y
01|113002|6|1|cross for Velocity's Basic|Y
01|113002|7|1|cross for Velocity's Extended Height|Y
01|113012|2|1|added in case cust does not have a wrench for holder|Y
01|113034|1|1|QUOTED LIVE FREE $ 15.00NET|Y
01|113034|3|1|QUOTED LIVE FREE $ 68.00|Y
01|113034|5|1|QUOTE LIVE FREE $ 43.38|Y
01|113034|8|1|QUOTED LIVE FREE $ 1080.00|Y
01|113039|9|1|ONCE SHIPPED THESE ITEMS MAY NOT BE RETURNED.|Y
01|113039|9|2|DISCOUNTS ARE PER SEPARATE AGREEMENT|Y
01|113039|9|3|BETWEEN JAD AND LYNDEX NIKKEN.|Y
01|113045|3|1|Installation includes external cable set hydraulic|Y
01|113045|3|2|components and labor on a machine previously|Y
01|113045|3|3|integrated.|Y
01|113049|1|1|Balance Pending|Y
01|113050|2|1|TBD if wrenches are required|Y
01|113053|1|1|Reference RGA# TOR-53428|Y
01|113053|1|2|Repair of PF-2|Y
01|113053|2|1|LR1-N 1.5V Batteries|Y
01|113053|3|1|Labor quoted for re-calibration.|Y
01|113054|2|1|Installation includes: drive unit short bar fiber|Y
01|113054|2|2|optic cables communication cables bulk head cable|Y
01|113054|2|3|set external cable set parameter changes service|Y
01|113054|2|4|time and travel|Y
01|113055|2|1|Installation includes: drive unit short bar fiber|Y
01|113055|2|2|optic cables communication cables bulk head cable|Y
01|113055|2|3|set external cable set parameter changes service|Y
01|113055|2|4|time and travel|Y
01|113058|4|1|Installation includes: drive unit short bar fiber|Y
01|113058|4|2|optic cables communication cables bulk head cable|Y
01|113058|4|3|set external cable set parameter changes service|Y
01|113058|4|4|time and travel|Y
01|113058|9|1|Installation includes: drive unit short bar fiber|Y
01|113058|9|2|optic cables communication cables bulk head cable|Y
01|113058|9|3|set external cable set parameter changes service|Y
01|113058|9|4|time and travel|Y
01|113059|1|1|SK20-4AC|Y
01|113059|2|1|SK20-5AC|Y
01|113059|3|1|SK20-6AC|Y
01|113059|4|1|SK20-8AC|Y
01|113059|5|1|SK20-10AC|Y
01|113061|4|1|Installation includes: drive unit short bar fiber|Y
01|113061|4|2|optic cables communication cables bulk head cable|Y
01|113061|4|3|set external cable set parameter changes service|Y
01|113061|4|4|time and travel|Y
01|113061|9|1|Installation includes: drive unit short bar fiber|Y
01|113061|9|2|optic cables communication cables bulk head cable|Y
01|113061|9|3|set external cable set parameter changes service|Y
01|113061|9|4|time and travel|Y
01|113063|1|1|Reference RGA# CUR-53418|Y
01|113063|1|2|Repair of C40RA-0025M Mimatic# 175241|Y
01|113063|2|1|Bearings seals and O-rings to be replaced.|Y
01|113080|1|1|Reference RGA# TAR-53512|Y
01|113080|1|2|TAT-105 s/n: 1958B|N
01|113091|3|1|Installation includes external cable set hydraulic|Y
01|113091|3|2|components and labor on a machine previously|Y
01|113091|3|3|integrated.|Y
01|113103|3|1|Installation includes external cable set hydraulic|Y
01|113103|3|2|components and labor on a machine previously|Y
01|113103|3|3|integrated.|Y
01|113111|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR NIKKEN 5TH AXIS RT|Y
01|113113|1|1|Note: Item is not standard stock-once a PO is received|Y
01|113113|1|2|item can not be canceled or returned.|Y
01|113123|3|1|Installation includes external cable set hydraulic|Y
01|113123|3|2|components and labor on a machine previously|Y
01|113123|3|3|integrated.|Y
01|113125|3|1|Installation includes external cable set hydraulic|Y
01|113125|3|2|components and labor on a machine previously|Y
01|113125|3|3|integrated.|Y
01|113134|3|1|We would plug DIN holes at no charge. ETA 5-7 Bus Days|Y
01|113153|1|1|19pcs HSK100A-C20-115G at factory 1-2wks delivery ARO|Y
01|113153|1|2|ID Chip Holes to be cut here aprox 1 addl week. Total|Y
01|113153|1|3|ETA aprox 3 weeks ARO while stock lasts at factory.|Y
01|113153|2|1|1pc HSK100A-MDSK16-140 at factory 1-2wks delivery ARO|Y
01|113153|2|2|ID Chip Holes to be cut here and Coolant J Nuts added|Y
01|113153|2|3|aprox 1 addl week. Total ETA for 1pc is 3wks ARO.|Y
01|113153|2|4|Balance of 7pcs is ETA aprox 16wks ARO|Y
01|113153|3|1|8pcs HSK100A-MDSK20-140 at factory 1-2wks delivery ARO|Y
01|113153|3|2|ID Chip Holes to be cut here and Coolant J Nuts added|Y
01|113153|3|3|aprox 1 addl week. Total ETA for 1pc is 3wks ARO while|Y
01|113153|3|4|stock lasts at factory.|Y
01|113155|16|1|CAT40-SF0875-3.15 <7/8 Shrink Fit Holder>|Y
01|113155|16|2|WILL CHECK ON PRICING/AVAILABILITY|Y
01|113155|24|1|SK6 STANDARD SPANNER WRENCH|Y
01|113155|25|1|SK10 STANDARD SPANNER WRENCH|Y
01|113155|26|1|SK16 STANDARD SPANNER WRENCH|Y
01|113155|27|1|SK25 STANDARD SPANNER WRENCH|Y
01|113157|3|1|Manual Tailstock w/ 15mm Stroke|Y
01|113157|4|1|Pnuematic Tailstock w/ 60mm Stroke|Y
01|113157|18|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|113157|18|2|ROTARY TABLE CONNECTION TO BULKHEAD OF HAAS DM2|Y
01|113177|2|1|*3 free tool holder pots per machine|Y
01|113177|2|2|**Please specify spindle type at time of order|Y
01|113179|1|1|Miyano live; ER16 STR;Ext/ Int coolant - ICE; 1015PSI|Y
01|113179|1|2|L=40mm;1:1 Gear ratio; max torque 50Nm; 12000RPM;|Y
01|113179|1|3|ref drwg# 00044949|Y
01|113179|1|4|Drawing approval is required.Lead from approval date|Y
01|113179|2|1|Miyano live; ER16 STR;Ext/ Int coolant - ICE; 1015PSI|Y
01|113179|2|2|L=40mm;1:1 Gear ratio; max torque 50Nm; 12000RPM;|Y
01|113179|2|3|ref drwg# 00044949|Y
01|113179|2|4|Drawing approval is required.Lead from approval date|Y
01|113179|3|1|Miyano live; ER16 90deg;Ext/ Int coolant - ICE; 1015PSI|Y
01|113179|3|2|L1=60mm;1:1 Gear ratio; max torque 25Nm; 6500RPM;|Y
01|113179|3|3|Output is reversal to input:ref drwg# 00037742|Y
01|113179|3|4|Drawing approval is required.Lead from approval date|Y
01|113179|4|1|Miyano live; ER16 90deg;Ext/ Int coolant - ICE; 1015PSI|Y
01|113179|4|2|L1=60mm;1:1 Gear ratio; max torque 25Nm; 6500RPM;|Y
01|113179|4|3|Output is reversal to input:ref drwg# 00037742|Y
01|113179|4|4|Drawing approval is required.Lead from approval date|Y
01|113181|1|1|Daiwoo BMT65;ER32Z-Axis;L1=100mm:|Y
01|113181|1|2|Drive spindle 2 flattened 9.94mm length 112mm:|Y
01|113181|1|3|1:1 Gear ratio;max 70Nm; 10000 RPM|Y
01|113181|1|4|Direction of rotation reversal|Y
01|113181|1|5|Int/Ext coolant 1015 PSI|Y
01|113181|1|6|Ref Drawing #00054661 (mim #193704)|Y
01|113181|3|1|Daiwoo BMT65; ER32 Z-Axiz L1=100mm|Y
01|113181|3|2|Drive spindle 2 flattened .94mm length 112mm|Y
01|113181|3|3|1:1 Gear ratio; max 70Nm; 10000RPM;|Y
01|113181|3|4|Direction of rotation reversal;|Y
01|113181|3|5|Int/ Ext coolant 1015 PSI;|Y
01|113181|3|6|Ref drwg# 00054661 (mim#193704)|Y
01|113193|6|1|*Internal Coolant Only!|Y
01|113218|2|1|*3 free tool holder pots per machine|Y
01|113218|2|2|**Please specify spindle type at time of order|Y
01|113220|1|1|Reference RGA# TAR-53530|Y
01|113220|1|2|TAT-170 s/n: 42587B|N
01|113221|1|1|CAT50-SF0750-6.00|Y
01|113221|1|2|CAT50 Shrink Fit Holders 3/4 with 6.00 gage length|Y
01|113221|1|3|special.|Y
01|113221|2|1|CAT50-SF0750-6.00|Y
01|113221|2|2|CAT50 Shrink Fit Holders 3/4 with 6.00 gage length|Y
01|113221|2|3|special|Y
01|113221|3|1|CAT50-SF1000-6.00|Y
01|113221|3|2|CAT50 Shrink Fit Holders 1 with 6.00 gage length|Y
01|113221|3|3|special|Y
01|113221|4|1|CAT50-SF1000-6.00|Y
01|113221|4|2|CAT50 Shrink Fit Holders 1 with 6.00 gage length|Y
01|113221|4|3|special.|Y
01|113221|5|1|CAT50-SF1250-6.00|Y
01|113221|5|2|CAT50 Shrink Fit Holders 1.1/4 with 6.00 gage length|Y
01|113221|5|3|special|Y
01|113221|6|1|CAT50-SF1250-6.00|Y
01|113221|6|2|CAT50 Shrink Fit Holders 1.1/4 with 6.00 gage length|Y
01|113221|6|3|special.|Y
01|113229|1|1|Price reflects a purchase order of 1 or 2 holders.|Y
01|113229|2|1|Price reflects 2~4 holders.|Y
01|113232|1|1|167594|Y
01|113244|3|1|Collet Range .108-.630|Y
01|113244|6|1|Collet Range .187-1.00|Y
01|113245|1|1|for Takisawa TS4000ys|Y
01|113248|5|1|Modify C5021-0750-6.00 with DIN holes|Y
01|113248|5|2|ETA 1 WK|Y
01|113250|1|1|Discount reflects purchase order of 1~2 tools.|Y
01|113250|2|1|Discount reflects purchase order of 3+ tools.|Y
01|113252|2|1|Installation includes: drive unit short bar fiber|Y
01|113252|2|2|optic cables communication cables bulk head cable|Y
01|113252|2|3|set external cable set parameter changes service|Y
01|113252|2|4|time and travel|Y
01|113271|5|1|Balance ETA 17-18 Weeks|Y
01|113276|1|1|HSK125A-ER32-120 or 4.724|Y
01|113276|1|2|ER32 Collet Chuck with 120mm or 4.724 gage length.|Y
01|113286|1|1|Will be for C4 spindle|Y
01|113286|2|1|Capto 4 Master Gauge|Y
01|113297|30|1|Not requested but recomended|Y
01|113318|2|1|Q26-DJ3-40A DJ Boring Head w/DJ Boring Bits included|Y
01|113323|5|1|POWER AND FEED BACK CABLES|Y
01|113333|19|1|Set is missing only KM1-1/4 we can discuss partial|Y
01|113333|37|1|This length only available with coolant ports this|Y
01|113333|37|2|can be used if not running coolant. Otherwise we have|Y
01|113333|37|3|a 3.15 gauge length in stock|Y
01|113339|2|1|INCLUDING EXTERNAL CABLE SET|Y
01|113340|1|1|Please Note: Nikken Japan requires a minimum order of|Y
01|113340|1|2|5 pull studs.|Y
01|113340|3|1|Please Note: This pull stud is stock at Nikken UK.|Y
01|113340|3|2|Since we do not have weekly shipments with them the|Y
01|113340|3|3|fee to fly these in is $250.00. FOB Mundelein IL 60060.|Y
01|113340|3|4|Addtional shipping fees will apply from Lyndex-Nikken|Y
01|113340|3|5|to Sabattus Machine.|Y
01|113354|1|1|Reference RGA# TOR-53460|Y
01|113354|1|2|CAT40-NPU8-80U Jaws are chipped.|Y
01|113363|2|1|This is a non standard stock item it cannot be|Y
01|113363|2|2|cancelled or returned once an order is placed.|Y
01|113363|6|1|Offered as an in stock option|Y
01|113364|1|1|Tooling Certificate Number: 13195-2251-030119|Y
01|113367|2|1|Please Note: The knob is $5.00 net with the purchase|Y
01|113367|2|2|of a matching taper holder.|Y
01|113377|3|1|Offered as an in stock option|Y
01|113384|2|1|POWER AND FEEDBACK CABLES 2 EA AXIS|Y
01|113384|3|1|PRICE IS NET TO HILLARY|Y
01|113384|3|2|PRICE INCLUDES REQUIRED SERVO AMPS CABLING NEEDS|Y
01|113384|3|3|TRAVEL AND MISC ITEMS FOR PROFESSIONAL INSTALL.|Y
01|113424|2|1|Includes drive unit external cables interface cables|Y
01|113424|2|2|communications cable fiber optic cables travel|Y
01|113424|2|3|labor expenses|Y
01|113426|1|1|Reference RGA# TAR-53529|Y
01|113426|1|2|Repair of 5AX-201YA s/n: 4288|N
01|113428|1|1|Reference RGA# TAR-53511|Y
01|113428|1|2|CNCB450FA s/n: 1217 Table will not clamp up. Looks like|Y
01|113428|1|3|we are not getting pressure.|Y
01|113428|24|1|CN450BB053: Strap|Y
01|113429|1|1|Item is 'gently' used. Non-returnable.|Y
01|113431|1|1|Special price per Hiro|Y
01|113443|1|1|Discontinued and non returnable|Y
01|113445|1|1|Tooling Certificate Number: 13687-2000-050418|Y
01|113450|4|1|SLD-G01-A3X-GR-C1-30 : Solenoid + Wires|Y
01|113453|4|1|On B/Odue 5/3 week|Y
01|113453|20|1|1-2wk lead AROnon std specialnot returnable/cancelabl|Y
01|113453|25|1|Non cancelablenon returnable|Y
01|113453|26|1|Non returnablenon cancelable|Y
01|113453|27|1|Non cancelable non returnable|Y
01|113453|28|1|Item is non cancelable non returnable|Y
01|113454|3|1|balance ETA 11-12 Weeks|Y
01|113460|14|1|for N4007-1000 collet chuck|Y
01|113466|2|1|Adapter ISO-A6 Type FF-3 D140|Y
01|113476|1|1|TABLE IS IN STOCK. SEIMENS MOTOR HAS 12 WEEK DELIVERY|Y
01|113476|1|2|WE ARE LOOKING AT OTHER SOURCES FOR THE MOTOR AND|Y
01|113476|1|3|POSSIBLY USING A HEIDENHAIN MOTOR TO REDUCE THIS TIME.|Y
01|113476|3|1|POWER AND FEEDBACK CABLE|Y
01|113476|3|2|PRODUCTION OF CABLE SET IS CONTINGENT ON PLUGS BEING|Y
01|113476|3|3|AVAILABLE IN THE USA.|Y
01|113476|3|4|EAGLE MACHINE TO PROVIDE PINOUT SCHEMATIC|Y
01|113477|1|1|Quoted as NET pricing|Y
01|113477|2|1|Quoted as NET pricing|Y
01|113477|3|1|Quoted as NET pricing|Y
01|113477|6|1|Quoted as NET pricingnon-returnable|Y
01|113483|3|1|12-Station|Y
01|113504|1|1|Tooling Certificate Number: 13435-1138-030818|Y
01|113515|1|1|1pc currently in stock|Y
01|113515|1|2|1pc Pending|Y
01|113522|4|1|Please Note: Lyndex-Nikken questionnaire must be|Y
01|113522|4|2|completed and returned when ordering this item.|Y
01|113522|4|3|Application will be approved thru the Lyndex-Nikken|Y
01|113522|4|4|engineering department.|Y
01|113522|4|5|A positioning block may be required and not added to|Y
01|113522|4|6|quote.|Y
01|113526|4|1|Option 1|Y
01|113526|5|1|Option 2|Y
01|113527|4|1|Option 1|Y
01|113527|5|1|Option 2|Y
01|113532|1|1|NBT50-FMH22.225-47-60 Face Mill Holder|Y
01|113532|1|2|Non standard stock item.Non cancelable non returnable|Y
01|113532|1|3|Pricing is NET price|Y
01|113532|2|1|NBT50-FMH25.4-70-45|Y
01|113532|2|2|Non standard stock item.Non cancelablenon returnable|Y
01|113532|2|3|Pricing is NET price|Y
01|113532|3|1|NBT50-FMH31.75-76-45|Y
01|113532|3|2|Non standard stock item.Non cancelable non returnable|Y
01|113532|3|3|Pricing is NET price|Y
01|113532|4|1|NBT50-FMH38.1-100-45|Y
01|113532|4|2|Non standard stock item.Non cancelablenon returnable|Y
01|113532|4|3|Pricing is NET price|Y
01|113532|5|1|NBT50-FMH22-60-60|Y
01|113532|5|2|Non standard stock item.Non cancelable non returnable|Y
01|113532|5|3|Pricing is NET price|Y
01|113535|1|1|Refernce RGA# LVR-53444|Y
01|113535|1|2|Repair of customer's MNL12-ER32X s/n: A1270|Y
01|113535|1|3|(Alps# T32206)|Y
01|113535|2|1|Bearings O-rings Seals Bearing Nut Collet Nut and|Y
01|113535|2|2|spindle shaft to be replaced.|Y
01|113535|2|3|***We will try to clean up the original spindle and|Y
01|113535|2|4|re-use; however we will not be able to tell if it will|Y
01|113535|2|5|be re-usable until assembled and test run. If we are|Y
01|113535|2|6|able to re-use the price will be $896.89|Y
01|113535|4|1|MNL12-ER32Z-MS s/n: A0215|Y
01|113535|4|2|(Alps# T32216)|Y
01|113535|5|1|Bearings O-rings Seals Bearing Nut Collet Nut|Y
01|113535|5|2|and Bevel Gears to be replaced.|Y
01|113540|1|1|Includes: Two CNCZ105LSA Rotary Tables Junction Box|Y
01|113540|1|2|External/Interface Cables Amplifier(s)& B-Axis Cable|Y
01|113540|2|1|USE P/N TCD-B9132 3+1 Port Rotary Union|Y
01|113541|3|1|Includes Installation Drive Units Bulkhead Cables|Y
01|113541|3|2|External Cables Service Time & Travel|Y
01|113542|1|1|Replaces B35-9000|Y
01|113546|4|1|Center Height does not match table and a riser is|Y
01|113546|4|2|required.|Y
01|113546|7|1|Installation includes:Drive unit short bar fiber|Y
01|113546|7|2|optic cable communications cable bulkhead cables|Y
01|113546|7|3|external cables parameter changes service time and|Y
01|113546|7|4|travel.|Y
01|113559|1|1|Questionnaire must be completed and approved prior to|Y
01|113559|1|2|our processing a PO|Y
01|113559|2|1|Customer to decide between custom block or making own|Y
01|113570|1|1|Non standard stockitem non cancelablenon returnable|Y
01|113570|2|1|HSK50A-TB40-200 Testbar|Y
01|113570|2|2|Non standard stock item is non cancelablenon returnabl|Y
01|113570|3|1|BT30-TB40-200 Testbar with PS-132 Pull Stud attached|Y
01|113570|3|2|Non standard stock item is non cancelablenon returnabl|Y
01|113573|1|1|8pcs STOCK 3pcs Pending|Y
01|113619|1|1|*Takisawa Machine Live Tool|Y
01|113624|3|1|Conversion includes motor motor gear motor cover|Y
01|113624|3|2|gear box cabling drive unit b-axis cable labor for|Y
01|113624|3|3|conversion|Y
01|113624|6|1|For M-code indexing only|Y
01|113627|1|1|ETA Balance 11-12 Weeks|Y
01|113635|3|1|Installation includes: drive unit short bar fiber|Y
01|113635|3|2|optic cables communication cables bulk head cable|Y
01|113635|3|3|set external cable set parameter changes service|Y
01|113635|3|4|time and travel|Y
01|113635|6|1|Heidenhain rotary scale feedback|Y
01|113636|3|1|Heidenhain scale feedback (with open center bore)|Y
01|113636|4|1|Installation includes: drive unit short bar fiber|Y
01|113636|4|2|optic cables communication cables bulk head cable|Y
01|113636|4|3|set external cable set parameter changes service|Y
01|113636|4|4|time and travel|Y
01|113651|1|1|SRS-3.0|Y
01|113651|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|2|1|SRS-3.01|Y
01|113651|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|3|1|SRS-3.05|Y
01|113651|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|5|1|SRS-4.01|Y
01|113651|5|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|6|1|SRS-5.0|Y
01|113651|6|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|7|1|SRS-5.01|Y
01|113651|7|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|8|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|9|1|SRS-6.01|Y
01|113651|9|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|10|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|11|1|SRS-8.01|Y
01|113651|11|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|12|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|13|1|SRS-13.0|Y
01|113651|13|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|14|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|15|1|SRS-20.0|Y
01|113651|15|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113651|16|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113661|1|1|Please Note: This tool is from the Lyndex-Nikken used|Y
01|113661|1|2|shelf. It is not ICE it is coolant thru. This tool|Y
01|113661|1|3|needs to run with coolant at all times. This tool was|Y
01|113661|1|4|never mounted in machine and is in excellent condition.|Y
01|113661|1|5|Price reflects used tool and is non returnable.|Y
01|113661|1|6|Warranty is 1 year for internal parts.|Y
01|113661|1|7|2 year mfg warranty on external body.|Y
01|113667|1|1|TABLE IS IN STOCK. SEIMENS MOTOR HAS 12 WEEK DELIVERY|Y
01|113667|1|2|WE ARE LOOKING AT OTHER SOURCES FOR THE MOTOR AND|Y
01|113667|1|3|POSSIBLY USING A HEIDENHAIN MOTOR TO REDUCE THIS TIME.|Y
01|113667|3|1|POWER AND FEEDBACK CABLE|Y
01|113667|3|2|PRODUCTION OF CABLE SET IS CONTINGENT ON PLUGS BEING|Y
01|113667|3|3|AVAILABLE IN THE USA.|Y
01|113667|3|4|EAGLE MACHINE TO PROVIDE PINOUT SCHEMATIC|Y
01|113670|1|1|Face Value: $10000.00|Y
01|113671|1|1|TABLE IS IN STOCK. SEIMENS MOTOR HAS 12 WEEK DELIVERY|Y
01|113671|1|2|WE ARE LOOKING AT OTHER SOURCES FOR THE MOTOR AND|Y
01|113671|1|3|POSSIBLY USING A HEIDENHAIN MOTOR TO REDUCE THIS TIME.|Y
01|113671|3|1|POWER AND FEEDBACK CABLE|Y
01|113671|3|2|PRODUCTION OF CABLE SET IS CONTINGENT ON PLUGS BEING|Y
01|113671|3|3|AVAILABLE IN THE USA.|Y
01|113671|3|4|EAGLE MACHINE TO PROVIDE PINOUT SCHEMATIC|Y
01|113673|1|1|Reference RGA# TAR-53528|Y
01|113673|1|2|NSVZ300FA s/n: 2209H Table was crashed.|Y
01|113679|1|1|Pricing reflects promo value only|Y
01|113699|2|1|Baker's Dozen Promo! Purchase 180 holders 13 are free!|Y
01|113699|9|1|These will have pluggable coolant ports|Y
01|113699|10|1|These will have pluggable coolant ports|Y
01|113699|12|1|These will have pluggable coolant ports|Y
01|113714|1|1|ref. Mazak 53308010100 OD Turning Tool|Y
01|113714|2|1|ref. Mazak 53308010300  ID Facing Tool|Y
01|113738|21|1|Our version is slotted for coolant|Y
01|113738|25|1|Our version is slotted for coolant|Y
01|113738|29|1|Our version is slotted for coolant thru|Y
01|113738|31|1|Our version is slotted for coolant|Y
01|113740|1|1|PLUGGING DIN HOLES|Y
01|113758|1|1|TOOLING CERT FOR TAMPA BAY MACHINING|Y
01|113758|1|2|NEGOTIATED A 35% DISCOUNT|Y
01|113814|2|1|Confirmation switches and protective cover|Y
01|113820|4|1|Delivery quoted is 1 week from receipt of customer's|Y
01|113820|4|2|spindle drawing.|Y
01|113820|4|3|Quoted at net price.|Y
01|113826|1|1|5-9pc|Y
01|113826|2|1|10-19pc pricing|Y
01|113826|3|1|20+pc|Y
01|113826|9|1|5-9pc|Y
01|113826|10|1|10-19pc pricing|Y
01|113826|15|1|20+pc|Y
01|113844|3|1|2 sets of cables for Rotary Table Setups|Y
01|113845|5|1|Scale feedback with through hole design|Y
01|113845|6|1|Includes parameter changes cable installation|Y
01|113845|6|2|service time and travel.|Y
01|113845|6|3|** Includes motor credit for conversion once new|Y
01|113845|6|4|DMG MORI machine arrives **|Y
01|113849|1|1|Reference RGA# TOR-53446|Y
01|113849|1|2|13 x HSK63F-MMC8C-127 and 1 x HSK63F-MMC126-129|Y
01|113849|1|3|Gears are starting to stick not tightening the way|Y
01|113849|1|4|they used to.|Y
01|113856|1|1|SF-POT-XX x 2 of your choice|Y
01|113856|2|1|SF-POT-XX x 2 of your choice|Y
01|113856|2|2|includes 10 CAT40 Coolant Port holders|Y
01|113856|3|1|SF-POT-XX x 3 of your choice|Y
01|113866|2|1|This Taperplus version is an instock option to offer|Y
01|113866|2|2|A one time 40% discount has been given|Y
01|113874|1|1|ETA on balance of 5 pcs 15-16 Weeks|Y
01|113874|2|1|ETA on balance of 3 pcs 15-16 Weeks|Y
01|113905|1|1|Reference RGA# LVR-53554|Y
01|113905|1|2|Repair of MZQT5-ER40Z-ICE s/n: 33491 02|Y
01|113905|1|3|(Mimatic# 124877)|Y
01|113905|2|1|Bearings seals and o-rings to be replaced.|Y
01|113921|3|1|6+1 Rotary Union **Special**|Y
01|113924|1|1|Special order itemnon cancelable nor returnable once|Y
01|113924|1|2|an order is placed|Y
01|113924|2|1|Special non standard stock item.Will not be cancelable|Y
01|113924|2|2|nor returnable once order is placed|Y
01|113924|3|1|Special non standard stock item.Will not be cancelable|Y
01|113924|3|2|nor returnable once the order is placed|Y
01|113928|1|1|VDI50 Emag Live Tool X-axis Straight Tool MI50 Output|Y
01|113928|1|2|P/N:124332|Y
01|113928|2|1|P/N:155473|Y
01|113928|3|1|VDI50 Emag Live Tool X-Axis Straight Tool ER32 Output|Y
01|113928|3|2|P/N:124329|Y
01|113929|1|1|Standard holder quoted we don't carry taper plus|Y
01|113929|2|1|Standard holder quoted we don't carry taper plus|Y
01|113929|3|1|Standard holder quoted we don't carry taper plus|Y
01|113929|6|1|This size is only available with coolant ports at this|Y
01|113929|6|2|time.|Y
01|113929|7|1|Offered shorter length as an in stock option|Y
01|113940|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|113951|1|1|Delivery is pending at this time.|Y
01|113953|1|1|Tooling Certificate Number: 13712TA-2286-040219|Y
01|113983|1|1|ETA for more would be 4-5 Weeks|Y
01|113991|6|1|Includes: Shrink Unit Cooling Unit Induction Rings|Y
01|113991|6|2|Cooling Brackets Storage Racks & Chuck Holders|Y
01|113992|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113992|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|113994|7|1|*4 gl instead of 3|Y
01|113994|17|1|*7 gl (instead of 6)|Y
01|113994|31|1|to use w/ 18N|Y
01|113994|32|1|to use w/ 16N|Y
01|114015|3|1|Installation includes: drive unit short bar fiber|Y
01|114015|3|2|optic cables communication cables bulk head cable|Y
01|114015|3|3|set external cable set parameter changes service|Y
01|114015|3|4|time and travel|Y
01|114015|6|1|Heidenhain rotary scale feedback|Y
01|114024|1|1|Tooling Certificate Number: 8270-2293-041119|Y
01|114057|16|1|*only offer in CP (coolant ports)|Y
01|114057|17|1|*only offer in CP (coolant ports)|Y
01|114066|10|1|missing KM1-1/4 all others available|Y
01|114076|12|1|Substitute for B4007-0040-3.13|Y
01|114101|16|1|*only offer in CP (coolant ports)|Y
01|114101|17|1|*only offer in CP (coolant ports)|Y
01|114119|4|1|***Special Price***|Y
01|114119|4|2|... see JB|Y
01|114144|7|1|*4 gl instead of 3|Y
01|114144|15|1|alt for C5016-1000-6.00|Y
01|114144|19|1|*7 gl (instead of 6)|Y
01|114144|24|1|alt for HSK100A-ER32-4.00|Y
01|114144|34|1|to use w/ 18N|Y
01|114144|35|1|to use w/ 16N|Y
01|114184|1|1|Ref#: 48-53|Y
01|114193|1|1|Special P/N: 850-40-1.00|Y
01|114193|1|2|Shell Mill 40mm with 1.00 g.l.|Y
01|114195|4|1|Installation Kit Includes Amplifier and cables|Y
01|114204|5|1|Installation includes: Drive unit short bar fiber|Y
01|114204|5|2|optic cable communications cable bulkhead cables|Y
01|114204|5|3|external cables parameter changes service time and|Y
01|114204|5|4|travel.|Y
01|114206|4|1|Installation includes: Drive unit short bar fiber|Y
01|114206|4|2|optic cable communications cable bulkhead cables|Y
01|114206|4|3|external cables parameter changes service time and|Y
01|114206|4|4|travel.|Y
01|114218|1|1|Includes Haas Motors and Cables|Y
01|114218|2|1|$1000.00 Complimentary Tooling Certificate with|Y
01|114218|2|2|purchase of Nikken 5AX-201YA-M Rotary Table.|Y
01|114238|2|1|Mimatic# 139339 Item #250 ref drwg# 00025146|Y
01|114238|2|2|Locating Pin's Sleeve|Y
01|114238|3|1|Mimatic Part #138844 Item #260 ref drwg# 00025146|Y
01|114238|3|2|Central Bolt Cam L size|Y
01|114238|4|1|Mimatic Part #138870 Item #265 ref drwg# 00025146|Y
01|114238|4|2|Central Bolt Cam S size|Y
01|114238|5|1|Mimatic Part #111874 Item #370 ref drwg# 00025146|Y
01|114238|5|2|Locating pin's spring.|Y
01|114251|2|1|Includes drive unit external cables interface cables|Y
01|114251|2|2|fiber optic cable communications cable short bar|Y
01|114251|2|3|travel labor expenses|Y
01|114251|6|1|Includes drive unit external cables interface cables|Y
01|114251|6|2|short bar fiber optic cable communications cable|Y
01|114251|6|3|travel labor expenses|Y
01|114257|1|1|for the customer's existing Q26-DJ8-44|Y
01|114285|2|1|POWER AND FEED BACK CABLES FOR EACH AXIS|Y
01|114315|2|1|New SPEC can use coolant port or seal them for dry run|Y
01|114315|5|1|New CP Spec has coolant ports which can be sealed|Y
01|114320|1|1|Reference RGA# TAR-53601|Y
01|114320|1|2|CNC302FA-M s/n: 12400C|N
01|114334|2|1|PRESETTER WITH ISO/CAT50 SPINDLE INCLUDED|Y
01|114334|3|1|E460 STAND (NOT NEEDED IF YOU ALREADY HAVE A TABLE)|Y
01|114334|4|1|ISO/CAT40 SPINDLE|Y
01|114334|5|1|CAT 50 CALIBRATION MASTER|Y
01|114334|6|1|CAT40 CALIBRATION MASTER|Y
01|114334|7|1|PRINTER FOR E460 PRESETTER|Y
01|114337|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|114337|3|2|External Cables Service Time & Travel.|Y
01|114340|1|1|for Puma 240 M|Y
01|114345|1|1|H100A-SF0500-14.5|Y
01|114345|1|2|HSK100A 1/2 Shrink Fit w/ 14.5 gage|Y
01|114349|1|1|HATHOR SIX A PRESETTER WITH CAT40 SPINDLE|Y
01|114349|2|1|CAT50 SPINDLE FOR HATHOR SIX A|Y
01|114349|3|1|CAT40 MASTER CALIBRATION GAUGE|Y
01|114349|4|1|CAT50 MASTER CALIBRATION GAUGE|Y
01|114349|5|1|PRINTER FOR HATHOR SIX A|Y
01|114350|4|1|DUAL AXIS CABLE SET FOR ROBODRILL|Y
01|114366|1|1|E346 Presetter with CAT50 Spindle|Y
01|114366|2|1|CAT40 Spindle|Y
01|114366|3|1|CAT40 Master Calibration Gauge|Y
01|114366|4|1|CAT50 Master Calibration Gauge|Y
01|114366|5|1|Printer for E346 Presetter|Y
01|114407|1|1|13860-2296-041219|Y
01|114415|5|1|BT30-MMC12C-105-AA - Coolant Version|Y
01|114417|1|1|Quoted as net pricing non-returnable non-cancelable|Y
01|114417|2|1|Quoted as net pricing non-returnable non-cancelable|Y
01|114417|3|1|Quoted as net pricing non-returnable non-cancelable|Y
01|114417|4|1|Quoted as net pricing non-returnable non-cancelable|Y
01|114423|1|1|Quoted in place of ER16 Radial Dual request|Y
01|114423|2|1|Quoted in place of ER16 Axial Dual request|Y
01|114423|2|2|No stock|Y
01|114423|3|1|Quoted as alternative in stock to item#2|Y
01|114423|6|1|Quoted in place of ER16 Radial Single request|Y
01|114423|7|1|Quoted in place of Axial Single request|Y
01|114430|9|1|Offered as 1 pc in stock option|Y
01|114430|11|1|Offered as an in stock option|Y
01|114430|19|1|Offered as an in stock option|Y
01|114430|25|1|Offered as an in stock option|Y
01|114430|34|1|Offered as in stock option|Y
01|114430|62|1|This collet is not offered as coolant sealed option|Y
01|114430|100|1|This is a non standard stock item and considered|Y
01|114430|100|2|special. Non cancelable non returnable.|Y
01|114430|101|1|This is a non standard stock item and is considered|Y
01|114430|101|2|special. Non cancelable non returnable.|Y
01|114432|1|1|Reference RGA# TAR-53579|Y
01|114432|1|2|5AX-130ZA s/n: 1768|Y
01|114440|9|1|NBT30-SZF16-105|Y
01|114440|9|2|2Lock TaperPlus NBT30 SK16 Slim Chuck Zero Fit|Y
01|114452|5|1|Please note: Because delivery is so long for|Y
01|114452|5|2|C4007-0016-3.50 I can offer C4007-0016B which is a|Y
01|114452|5|3|pre-balanced and balancable holder. These are nice|Y
01|114452|5|4|holders and the customer would like them.|Y
01|114463|3|1|Schunk vise + jaws + adapter plate|Y
01|114467|1|1|STANDARD HOLDER|Y
01|114467|2|1|BALANCEABLE HOLDER|Y
01|114473|2|1|$5 pullstud promo - Only when purchased with holder|Y
01|114507|3|1|Optional Item|Y
01|114511|4|1|***Special Price***|Y
01|114511|4|2|... see JB|Y
01|114511|5|1|Installation includes: drive unit short bar fiber|Y
01|114511|5|2|optic cables communication cables bulk head cable|Y
01|114511|5|3|set external cable set parameter changes service|Y
01|114511|5|4|time and travel|Y
01|114517|1|1|BT50-SK6-105P|Y
01|114517|1|2|BT50 SK6 Slim Chuck High Speed coolant|Y
01|114521|1|1|Installed W/PS-130E Pull Stud|Y
01|114521|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|114521|2|1|Installed on BT30-TB40-150|Y
01|114521|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|114537|3|1|$5 knob promo per holder purchased.|Y
01|114541|1|1|Tooling Certificate Number: 25000-750-030116|Y
01|114553|3|1|P/N: HSK63F-SF1000-6.00CP|Y
01|114553|3|2|HSK63F taper 1 Shrink Fit Holder with 6.00 gage length|Y
01|114553|3|3|and pluggable coolant ports.|Y
01|114553|4|1|P/N: HSK63F-SF1000-CP|Y
01|114553|5|1|P/N: HSK63F-SF1000-10.00CP|Y
01|114553|5|2|HSK63F 1 Shrink Fit Holder w/ 10.00 gage length|Y
01|114553|5|3|w/ pluggable coolant ports|Y
01|114553|8|1|P/N: HSK63F-SF0750-10.00CP|Y
01|114553|8|2|HSK63F 3/4 Shrink Fit Holder w/ 10.00 gage length|Y
01|114553|8|3|w/ pluggable coolant ports|Y
01|114553|11|1|P/N: HSK63F-SF0750-10.00CP|Y
01|114556|1|1|HFO TAMPA TO SUPPLY MOTOR AND CABLES|Y
01|114556|1|2|TABLE AND TAILSTOCK IN STOCK|Y
01|114556|5|1|HFO TAMPA TO SUPPLY MOTORS AND CABLES|Y
01|114556|9|1|HFO TAMPA TO SUPPLY CABLES AND MOTORS|Y
01|114556|13|1|ONE SK COLLET CHUCK PROMOTION KIT PER ROTARY|Y
01|114558|3|1|INSTALLATION INCLUDES ALL HARDWARTE CABLES DUAL AXIS|Y
01|114558|3|2|DRIVES TRAINING TRAVELLABOR|Y
01|114577|2|1|Offered as in stock option|Y
01|114596|1|1|Reference RGA# LVR-53490|Y
01|114596|1|2|MZQT47-ER32X-OFF-C s/n: 30101 03|Y
01|114596|1|3|(Mimatic# 124259)|Y
01|114596|2|1|All bearings seals and O-rings to be replaced.|Y
01|114596|2|2|Resurface ER32 Spindle|Y
01|114596|4|1|Mazak ER32 V-type s/n: n/a|Y
01|114596|5|1|All bearings seals and o-rings to be replaced.|Y
01|114599|2|1|Includes Cables for full 4th Axis setup.|Y
01|114599|3|1|Includes full RT installation: labor travel drives|Y
01|114599|3|2|necessary accessories|Y
01|114606|3|1|Installation includes: drive unit short bar fiber|Y
01|114606|3|2|optic cable communications cable bulk head cables|Y
01|114606|3|3|external cables peramater changes service time &|Y
01|114606|3|4|travel.|Y
01|114608|2|1|Includes: drive unit short bar fiber optic cables|Y
01|114608|2|2|communications cables bulk head cables external|Y
01|114608|2|3|cables peramter changes service time/travel|Y
01|114610|4|1|Includes: rotary axis drive unit communications cable|Y
01|114610|4|2|fiber optic cable bulk head cable external cable|Y
01|114610|4|3|short bar peramter changes service time and travel|Y
01|114610|7|1|w/ Independet controls for M code & RS-232 communicatin|Y
01|114614|4|1|This item is considered special once ordered it|Y
01|114614|4|2|cannot be cancelled or returned.|Y
01|114617|5|1|Balluf Chip and Coolant Tube installed|Y
01|114617|5|2|Net price|Y
01|114617|8|1|Contains: (2) Keys & (2) Bolts|Y
01|114624|2|1|THIS INCLUDES 4TH AND 5TH AXIS DRIVES INTERNAL CABLES|Y
01|114624|2|2|ALLCONNECTORS IN ELECTRICAL CABINET AND BULKHEAD OF|Y
01|114624|2|3|MACHINE JUMPER CABLES FIBER OPTIC CABLES INTERFACE|Y
01|114624|2|4|CABLES HYDRAULIC CONNECTORSMISC. HARDWARE|Y
01|114624|2|5|**ORIGINAL LIST NORMAL IS $ 13500 FOR 4TH/5TH INSTALL|Y
01|114624|2|6|PLEASE MAKE NOTE A $ 3100.00 CREDIT FROM ORIGINAL|Y
01|114624|2|7|HARDWARE COST IS SHOWN AS A DISCOUNT. THESE AE ALREADY|Y
01|114624|2|8|WITH 3RD TABLE|Y
01|114624|2|9|PLEASE ADVISE WHO TO INVOICE FOR PARTS. LYNDEX NIKKEN|Y
01|114624|2|10|DOES NOT HAVE AN ACCOUNT WITH SCCY|Y
01|114641|1|1|Reference RGA# TAR-53487|Y
01|114641|1|2|5AX-130 s/n: 4502|N
01|114643|4|1|Includes drive unit external cables interface cables|Y
01|114643|4|2|fiber optic cable communications cable short bar|Y
01|114643|4|3|ferrite travel labor expenses|Y
01|114644|26|1|Position block made by L&N.|Y
01|114644|26|2|Spindle drawing confirmation required.|Y
01|114648|19|1|Only 1/4 missing from set can discuss partial|Y
01|114649|1|1|** Wrenches x2 & CASE-MIM-C40RA-0025M Included **|Y
01|114649|1|2|One time discount for Lextron|Y
01|114649|2|1|Machine is Mori CMX1100V|Y
01|114653|1|1|Machine is a Doosan HM1000|Y
01|114657|6|1|Please Note: This tool is from the Lyndex-Nikken used|Y
01|114657|6|2|It is not ICE it is coolant thru. This tool|Y
01|114657|6|3|needs to run with coolant at all times. This tool was|Y
01|114657|6|4|never mounted in machine and is in excellent condition.|Y
01|114657|6|5|Price reflects used tool and is non returnable.|Y
01|114659|1|1|Need Data Sheets to spec proper cables & motor.|Y
01|114659|5|1|Need Data Sheets to spec proper cables & motor.|Y
01|114668|1|1|** Wrenches x2 & CASE-MIM-C40RA-0025M Included **|Y
01|114668|1|2|One time discount for Lextron|Y
01|114668|2|1|Machine is Mori CMX1100V|Y
01|114670|1|1|Internal ER Nut|Y
01|114670|2|1|Machine is Mori CMX1100V|Y
01|114674|1|1|GKN-UNV#2  N5006-0500A-2.265-ID-GKN|Y
01|114674|1|2|NMTB50 1/2 End Mill Holder Aerospace GKN UNV#2 ID chip|Y
01|114674|1|3|hole.  Quoted at Net Price|Y
01|114676|1|1|GKN-UNV#2  N5006-0500A-2.625-ID-GKN|Y
01|114676|1|2|NMTB50 1/2 End Mill Holder Aerospace GKN UNV#2 ID chip|Y
01|114676|1|3|hole.|Y
01|114677|1|1|Reference RGA# TOR-53540|Y
01|114677|1|2|PF-2|Y
01|114689|2|1|1 Boring Bar Holder|Y
01|114689|3|1|1.25 Boring Bar Holder|Y
01|114689|4|1|1.25 Main/Sub Boring Bar Holder|Y
01|114689|5|1|1.5 Boring Bar Holder|Y
01|114689|6|1|32mm Cut Off Tool Holder|Y
01|114689|7|1|1 ID Stick Turning Tool Holder|Y
01|114689|8|1|3/4 ID Stick Turning Tool Holder|Y
01|114689|9|1|3/4 OD Stick Turning Tool Holder|Y
01|114689|10|1|3/4 OD Stick Main/Sub Turning Tool Holder|Y
01|114689|12|1|1 Boring Bar Holder|Y
01|114689|13|1|1.25 Boring Bar Holder|Y
01|114689|14|1|1.5 Boring Bar Holder|Y
01|114689|15|1|1.5 Main/Sub Boring Bar Holder|Y
01|114689|16|1|32mm Cut Off Tool Holder|Y
01|114689|17|1|1 ID Stick Turning Tool Holder|Y
01|114689|18|1|1 OD Stick Turning Tool Holder - Right Hand|Y
01|114689|19|1|1 OD Stick Turning Tool Holder - Left Hand|Y
01|114689|20|1|1 OD Stick Main/Sub Turning Tool Holder|Y
01|114689|22|1|1.5 Boring Bar Holder|Y
01|114689|23|1|2 Boring Bar Holder|Y
01|114689|24|1|32mm Cut Off Tool Holder|Y
01|114689|25|1|1 ID Turning Tool Holder|Y
01|114689|26|1|1 OD Turning Tool Holder|Y
01|114689|27|1|1 OD Main/Sub Turning Tool Holder|Y
01|114689|30|1|1.5 Boring Bar Holder|Y
01|114689|31|1|1.5 Main/Sub Boring Bar Holder|Y
01|114689|32|1|32mm Cut Off Tool Holder|Y
01|114689|33|1|1 ID Stick Turning Tool Holder|Y
01|114689|34|1|1 OD Stick Turning Tool Holder|Y
01|114689|35|1|1 OD Main/Sub Stick Turning Tool Holder|Y
01|114689|38|1|1 Boring Bar Holder|Y
01|114689|39|1|1.25 Boring Bar Holder|Y
01|114689|40|1|1.5 Boring Bar Holder|Y
01|114689|41|1|32mm Cut Off Tool Holder|Y
01|114689|42|1|1 ID Stick Turning Tool Holder|Y
01|114689|43|1|3/4 ID Stick Turning Tool Holder|Y
01|114689|44|1|1 OD Stick Turning Tool Holder|Y
01|114689|45|1|3/4 OD Stick Turning Tool Holder|Y
01|114689|46|1|3/4 OD Main/Sub Stick Turning Tool Holder|Y
01|114689|49|1|1 Boring Bar Holder|Y
01|114689|50|1|1.25 Boring Bar Holder|Y
01|114689|51|1|1.5 Boring Bar Holder|Y
01|114689|52|1|1.5 Main/Sub Boring Bar Holder|Y
01|114689|53|1|2 Boring Bar Holder|Y
01|114689|54|1|32mm Cut Off Tool Holder|Y
01|114689|55|1|1 ID Stick Turning Tool Holder|Y
01|114689|56|1|1 OD Stick Turning Tool Holder|Y
01|114689|57|1|1 OD Main/Sub Stick Turning Tool Holder|Y
01|114689|60|1|1.5 Boring Bar Holder|Y
01|114689|61|1|2 Boring Bar Holder|Y
01|114689|62|1|32mm Cut Off Tool Holder|Y
01|114689|63|1|1 ID Stick Turning Tool Holder|Y
01|114689|64|1|1 OD Stick Turning Tool Holder|Y
01|114690|42|1|For Milling Chuck with ID Depth of Less Than 77mm|Y
01|114690|43|1|For Milling Chuck with ID Depth of 105mm or More|Y
01|114693|1|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|114693|1|2|External Cables Service Time & Travel.|Y
01|114723|2|1|Quoted at net price.|Y
01|114724|2|1|Installation includes: Drive unit short bar fiber|Y
01|114724|2|2|optic cable sommunications cable bulkhead cables|Y
01|114724|2|3|external cables parameter changes service time and|Y
01|114724|2|4|travel.|Y
01|114728|1|1|Reference RGA# CUR-53557|Y
01|114728|1|2|Repair of H80FRAM-ER16-206ST s/n: 39643 02|Y
01|114728|1|3|(Mimatic# 167594)|Y
01|114728|2|1|Bearings seals and o-rings to be replaced.|Y
01|114729|1|1|B/O due in 5/7 week|Y
01|114734|1|1|17 Currently available.|Y
01|114734|2|1|7 pcs left discontinued all sales final|Y
01|114734|3|1|10 pcs left discontinued all sales are final|Y
01|114735|1|1|RGA TAR-53564|Y
01|114735|1|2|CNC401TFA S/N 10213|Y
01|114739|11|1|net price|Y
01|114778|1|1|Ref: RGA TAR-53641|Y
01|114786|2|1|Set is only missing part # SK6-1.75 we can discuss|Y
01|114786|2|2|parital if necessary.|Y
01|114814|1|1|Reference RGA# TOR-53629|Y
01|114814|1|2|Repair of PF-2|Y
01|114814|2|1|Labor quoted for re-calibration.|Y
01|114831|2|1|P/N: HSK63A-SMS27-60|Y
01|114844|1|1|Reference RGA# TOR-53675|Y
01|114844|1|2|Repair of 1 x PF-2|Y
01|114844|4|1|Labor qoted for calibration.|Y
01|114855|4|1|POWER FEEDBACK CABLE SET|Y
01|114855|4|2|NO INSTALLATION QUOTED|Y
01|114860|1|1|Nikken Reamer NCS-6.30 Straight Shank Thru Hole|Y
01|114860|1|2|Quoted as 1~2 Pcs.|Y
01|114873|4|1|Additional discount reflects core trade-in discount|Y
01|114873|4|2|Due to excessive rust on the internal parts technician|Y
01|114873|4|3|is recommending to replace.|Y
01|114883|1|1|27 of these pull studs are in Chicago; There are|Y
01|114883|1|2|hundreds available in Nikken Japan. Those can be|Y
01|114883|1|3|shipped immediately upon order; 1 week delivery.|Y
01|114883|1|4|PS-16 is a solid pull stud; No Coolant Thru|Y
01|114883|2|1|Coolant Thru Pull Stud|Y
01|114884|1|1|12 inserts in 1/set|Y
01|114898|1|1|Reference RGA# LVR-53611|Y
01|114898|1|2|Repair of OKL3-ER32X s/n: A1047|Y
01|114898|2|1|Spindle gears collet nut bearings seals & o-rings|Y
01|114898|2|2|must all be replaced. Labor is included.|Y
01|114908|2|1|Installation includes: drive unit short bar fiber|Y
01|114908|2|2|optic cables communication cables bulk head cable|Y
01|114908|2|3|set external cable set parameter changes service|Y
01|114908|2|4|time and travel|Y
01|114917|9|1|2 pots in taper of choice included at n/c|Y
01|114917|9|2|Please specify taper|Y
01|114930|1|1|Special Howa chuck|Y
01|114930|1|2|Part#: C1TA165 H-493|Y
01|114930|1|3|Howa#: C1TA165 H-493 + Coolant Collector|Y
01|114930|1|4|(HH35CA10 Replacement)|Y
01|114936|1|1|*** End user must confirm 110V AC solenoid before ship|Y
01|114943|1|1|***3/64 Min - 1'' Max G.L. 10|Y
01|114956|8|1|holds .101|Y
01|114956|14|1|holds .264|Y
01|114956|16|1|holds .318|Y
01|114956|21|1|holds .688|Y
01|114956|22|1|holds .890|Y
01|114956|23|1|holds 1|Y
01|114963|2|1|NOTE NOTE--> S32-ZMACX42-330C is discontinued|Y
01|114963|2|2|P/N: S32-ZMACX42-275C|Y
01|114963|2|3|Straight Shank Deep Holde ZMACX Boring Bar|Y
01|114966|6|1|Non-returnablenon-cancelable|Y
01|114970|4|1|Alt for SKN-20BJ(GH)|Y
01|114976|5|1|CONNECT TWO E46L PRESETTERS TO A NETWORK WITH SOFTWARE|Y
01|114976|5|2|REMOTELY NEWORKED TO 1 EXTERNAL PC. FUNCTIONS INCLUDE:|Y
01|114976|5|3|1) ABILITY TO SCAN QR CODE TO IDENTIFY THE TOOL.|Y
01|114976|5|4|2) PASSWORD PROTECTED ACCESS TO TOOL MEASUREMENT.|Y
01|114976|5|5|3) INCLUDES 1 COMMON DATABASE WITH SHARED INFORMATION.|Y
01|114976|5|6|4) RECORD TOOL MEASUREMENT OPERATOR DATE TIME AND X|Y
01|114976|5|7|Y & Z VALUES AND NOTES.|Y
01|114976|5|8|5) INCLUDES ONE 2D READER FOR EACH PRESETTER.|Y
01|114976|5|9|PLEASE NOTE PRICES ARE BASED ON THE PURCHASE OF 2|Y
01|114976|5|10|PRESETTERS.|Y
01|114976|6|1|Specific customer requested upgrades. Per the email|Y
01|114976|6|2|provided by Melvin.|Y
01|114982|2|1|Quoted at net price.|Y
01|114996|2|1|quoted as in stock option|Y
01|115000|1|1|Includes special rust proof coating|Y
01|115000|2|1|Includes special rust proof coating|Y
01|115008|8|1|4pcs Stock remainder ETA TBD|Y
01|115010|1|1|Reference RGA# TOR-53629|Y
01|115010|1|2|Repair of PF-2|Y
01|115010|2|1|Labor quoted for re-calibration.|Y
01|115036|1|1|Items are non standard stock.  Once a PO is placed it|Y
01|115036|1|2|cannot be canceled or returned.|Y
01|115095|2|1|ETA 5/30 if ordered before 5/15.|Y
01|115095|2|2|# 24.09.016.001|Y
01|115107|1|1|1 PC ETA 1 WK 1 PC ETA 13-14 WKS|Y
01|115107|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|115120|3|1|POWER/FEEDBACK EXTERNAL CABLE SET|Y
01|115123|1|1|Tooling Certificate Number: E8165-2273-032019|Y
01|115123|14|1|8pcs Stk/ 23pcs 1wk / 20pcs 2 wks|Y
01|115131|1|1|*1pc pricing|Y
01|115131|2|1|*2pc pricing|Y
01|115136|9|1|2 pots in taper of choice included at n/c|Y
01|115136|9|2|Please specify taper|Y
01|115139|1|1|Rotary table DOES NOT have a faceplate; one must|Y
01|115139|1|2|be chosen from the two below.|Y
01|115139|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|115139|4|2|BULKHEAD TO ROTARY TABLE|Y
01|115139|7|1|TAIWANESE SUPPORT TABLE; CHEAPER VERSON OF TAT-170|Y
01|115199|1|1|P/N: MCAT50-SK6C-165UP|Y
01|115199|1|2|THREE LOCK CAT50 SK6 Hi-Speed Collet Chuck|Y
01|115203|1|1|KS-SW105R-ZA3|Y
01|115203|1|2|5AX-SW105-203ZA Replacement Motor Cover|Y
01|115203|1|3|SN: 1022 - 1026|Y
01|115216|1|1|*** Please provide motor infomation for mount hardware|Y
01|115222|1|1|Reference RGA# TAR-51857|Y
01|115222|1|2|5AX-4MT-NC5/85S-152.4FA s/n: 2139|Y
01|115222|8|1|Plating Cylinder Flange|Y
01|115222|10|1|Boat shipping charge from USA to Japan|Y
01|115222|11|1|Boat shipping charge from Japan to USA|Y
01|115222|11|2|Waived per Nick K|Y
01|115242|4|1|*Internal Coolant and also can run dry|Y
01|115243|8|1|Cannot be modified with jet slots.|Y
01|115272|1|1|Reference RGA# TAR-53727|Y
01|115272|1|2|TAT-250 s/n: 1200|N
01|115281|1|1|Price is LIST price|Y
01|115281|1|2|Item is considered a non standard stock special and is|Y
01|115281|1|3|not cancelable nor returnable once PO is placed|Y
01|115281|2|1|Pice is LIST price|Y
01|115292|1|1|Pratt Bernard Part # 1223500 12 3 Jaw Super Precision|Y
01|115292|1|2|Flat Back Chuck - Replacement for 9219-02392 SN: H43510|Y
01|115292|2|1|Adapter Plate to fit onto CNC302 S/N 6066|Y
01|115292|2|2|Pratt Bernard Part # 1203CNC302|Y
01|115293|42|1|Torque Wrench is optional but recomended|Y
01|115299|4|1|Raiser (Hight 35mm) for CST100-135|Y
01|115299|4|2|Special Order. Unit Price Each.|Y
01|115318|1|1|HSK63T-180-TH25L-115|Y
01|115318|1|2|1 PC ETA 2 WKS BALANCE ETA 14-15 WKS|Y
01|115318|1|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|115324|1|1|Reference RGA TAR-53711|Y
01|115324|1|2|CNC250 S/N: 4334|Y
01|115356|1|1|***Quote is based on STD pitch(110mm)***|Y
01|115376|2|1|Closest Equivalent to Big Kaiser BCV50-HMC1.25-4|Y
01|115386|1|1|Reference RGA# TAR-53727|Y
01|115386|1|2|TAT-250 s/n: 1233|N
01|115393|5|1|Includes Installation Drive Units Bulkhead Cables|Y
01|115393|5|2|External Cables Service Time & Travel|Y
01|115400|4|1|Hold 10-24|Y
01|115400|5|1|Hold 10-32|Y
01|115409|1|1|OK112-10050 is included with this item.|Y
01|115413|3|1|Direct Mount Cable for Kitamura MyCenter HX500i|Y
01|115413|3|2|Approx 7ft Long|Y
01|115413|3|3|Direct Mount Style - 1 plug for PWR/Feed|Y
01|115413|4|1|7ft Hyd Hose with Quick Disconnects|Y
01|115415|6|1|Substitute for above holder NC4006-1250-4.00.|Y
01|115415|9|1|Substitute for above holder NC4001-1000-1.75.|Y
01|115415|11|1|Substitute for above holder NC4011-0750-4.00|Y
01|115415|27|1|Substitute for above holder C4017-0020-4.00.|Y
01|115422|2|1|HSK63A-1/8 Shrink Fit Holder 3.15 GL|Y
01|115422|2|2|Non-returnablenon-cancelable|Y
01|115422|6|1|H63A-SF0187-3.15|Y
01|115422|6|2|Non-returnablenon-cancelable|Y
01|115422|7|1|H63A-SF0187-6.30|Y
01|115422|7|2|Non-returnablenon-cancelable|Y
01|115426|1|1|w/ 110mm STD pitch|Y
01|115426|2|1|Lyndex-Nikken to make position block|Y
01|115426|2|2|upon release of spindle drawing confirmation|Y
01|115426|2|3|Net price|Y
01|115430|2|1|customer providing balluf chip to be installed on|Y
01|115430|2|2|holder and balanced|Y
01|115430|3|1|HS Coolant Nut installed|Y
01|115430|4|1|Coolant back-up screw and coolant tube installed|Y
01|115430|7|1|customer providing balluf chip to be installed on|Y
01|115430|7|2|holder and balanced|Y
01|115430|8|1|High-speed coolant nut installed|Y
01|115430|9|1|Coolant back-up screw and coolant tube installed|Y
01|115430|13|1|customer providing balluf chip to be balanced and|Y
01|115430|13|2|installed|Y
01|115430|14|1|HS coolant nut installed|Y
01|115430|15|1|Back-up screw and coolant tube installed|Y
01|115442|1|1|HSK63A-SK10C-105P has SKN-10K(GH) removed and|Y
01|115442|1|2|SKN-10BJ(GH) installed on to holder.|Y
01|115442|3|1|HSK63A-SK16C-120P has SKN-16b(GH) removed and|Y
01|115442|3|2|SKN-16BJ(GH) installed on holder.|Y
01|115443|1|1|Recommended repl to OKU-L370-X as originally rqstd|Y
01|115448|3|1|Line 2 and 3 together combine to NMTB50 taper|Y
01|115457|1|1|Reference RGA# LVR-53735|Y
01|115457|1|2|OKLB15M-ER32X s/n: A0286 (OK101-11003)|Y
01|115457|2|1|Bearings O-rings seals and collet nut must be|Y
01|115457|2|2|replaced.|Y
01|115457|2|3|Spindle and gears may need to be replaced; technician|Y
01|115457|2|4|will not be able to tell until he is completing the|Y
01|115457|2|5|repair.  Should neither of these items be needed for|Y
01|115457|2|6|the repair fee may be $1200.50 net.|Y
01|115457|2|7|Labor is included.|Y
01|115470|1|1|N5006-0750A-5.75-ID-GKN NMTB50 EM Holder Aerospace|Y
01|115470|1|2|GKN UNV#13 ID Chip Hole|Y
01|115471|1|1|N5006-0750A-5.75-ID-GKN NMTB50 EM Holder Aerospace|Y
01|115471|1|2|GKN UNV#13 ID Chip Hole|Y
01|115484|2|1|This size is only offered with coolant ports at this|Y
01|115484|2|2|time|Y
01|115484|4|1|This size is only offered with coolant ports at this|Y
01|115484|4|2|time.|Y
01|115484|6|1|This holder will come with pluggable coolant ports|Y
01|115484|17|1|Offered as in stock option|Y
01|115484|23|1|Speed: 20000 RPM G2.5|Y
01|115484|23|2|Cannot be balanced to a higher speed.|Y
01|115484|31|1|Old style Balanceable cannot cancel cannot return|Y
01|115484|33|1|15000 RPM|Y
01|115484|35|1|Old style Balanceable cannot cancel cannot return|Y
01|115499|1|1|400MM table without Allen Bradley motor.|Y
01|115499|1|2|500PSI Hydraulic source required for the brake system|Y
01|115499|1|3|Not included with the above pricing.|Y
01|115499|2|1|Center height does not match table. Riser required.|Y
01|115507|1|1|BMT65 CAPTO4 Live Tool|Y
01|115507|1|2|Doosan SMX3100ST|Y
01|115525|8|1|CREDIT TOWARDS LYNDEX-NIKKEN TOOLING!$2000|Y
01|115525|8|2|Model#HATHOR SIX A|Y
01|115539|1|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|115558|1|1|*1pc pricing|Y
01|115564|10|1|*Option|Y
01|115566|1|1|Cable and hose kits for Okuma table for M560 bulkhead|Y
01|115572|3|1|Manual Tailstock w/ 15mm Stroke|Y
01|115581|1|1|This holder does not have DIN holes.|Y
01|115585|1|1|Reference RGA# CUR-53523|Y
01|115585|1|2|C50RAM-ER32-285ST-110TP s/n: 6415901 (Mim#178127)|Y
01|115585|2|1|CAT50 Spindle along with housing with case must be|Y
01|115585|2|2|replaced.|Y
01|115585|2|3|Bearings seals and o-rings must also be replaced.|Y
01|115585|2|4|Labor is included.|Y
01|115596|1|1|Reference RGA# TAR-53798|Y
01|115596|1|2|CNCZ180L s/n: 20053|Y
01|115596|22|1|Expedite fee to have table completed within 3-5|Y
01|115596|22|2|business days from receipt.|Y
01|115596|22|3|Table received on 5/13/19.|Y
01|115605|7|1|NO WORKHOLDING INCLUDED. CONFIRMATION OF FIT ON MACHINE|Y
01|115605|7|2|BASED ON MACHINE PART AND WORKHOLDING|Y
01|115624|1|1|OK10218000|Y
01|115633|1|1|Reference RGA# TAR-53727|Y
01|115633|1|2|CNC-260 s/n: 1593-1|N
01|115644|1|1|Service call on 2x 5AX-130 s/n: 5723 & NA completed|Y
01|115644|1|2|by Alec Schneider on 5/10/2019.|Y
01|115644|2|1|Transit Time: 5hrs x $100.00 = $500.00|Y
01|115644|2|2|Gas per Mileage: 130mi x $0.565 = $73.45|Y
01|115644|2|3|Meals: $50.00 x 1 Technician|Y
01|115644|5|1|Face seal cover plate|Y
01|115647|1|1|w/PS-N46E|Y
01|115647|1|2|Quoted as net pricing no returnable no cancellable|Y
01|115647|2|1|w/PS-N46E Lock Bolt(Coolant Through)|Y
01|115647|2|2|Quoted as net pricing no returnable no cancellable|Y
01|115647|3|1|w/PS-N46E|Y
01|115647|3|2|Quoted as net pricing no returnable no cancellable|Y
01|115647|4|1|w/PS-N46E|Y
01|115647|4|2|Quoted as net pricing no returnable no cancellable|Y
01|115647|5|1|w/PS-N46E|Y
01|115647|5|2|Quoted as net pricing no returnable no cancellable|Y
01|115647|6|1|w/PS-N46E|Y
01|115647|6|2|Quoted as net pricing no returnable no cancellable|Y
01|115647|7|1|w/PS-N46E|Y
01|115647|7|2|Quoted as net pricing no returnable no cancellable|Y
01|115647|8|1|w/PS-N46E|Y
01|115647|8|2|Quoted as net pricing no returnable no cancellable|Y
01|115647|9|1|w/PS-N46E|Y
01|115647|9|2|Quoted as net pricing no returnable no cancellable|Y
01|115666|1|1|13170TA-2268-031519|Y
01|115672|1|1|Without Motors|Y
01|115672|2|1|Tilt Axis Scale - Includes the scale mounting adapter|Y
01|115672|2|2|hardware & wiring on the table side.|Y
01|115672|3|1|Standard Cable Set|Y
01|115676|1|1|TAT-321N-240|Y
01|115676|1|2|Support Table 320mm Face Plate|Y
01|115676|1|3|Special order. Special Type|Y
01|115676|1|4|No cancelation No refund after PO|Y
01|115676|1|5|Shipping will be by boat from Japan|Y
01|115677|9|1|HSK63A-SK20-105|Y
01|115680|2|1|CABLE MANAGEMENT SWING BOX. ALLOWS ROTATION OF B AXIS|Y
01|115680|3|1|EXTENDED LENGTH EXTERNAL POWER AND FEEDBACK CABLE SET|Y
01|115680|4|1|PRICE IS NET TO DMG MORI|Y
01|115680|4|2|PRICE INCLUDES TRAVEL EXPENSES SERVO AMPS AND|Y
01|115680|4|3|REQUIRED CABLE MANAGEMENT COMPONENTS.|Y
01|115741|1|1|CAT40-SK10-60UP-IDU|Y
01|115744|1|1|Mori Live BMT60; ER16 MAIN/SUB;|Y
01|115744|1|2|1:3 GEAR; MAX 18000RPM; 10Nm torque;|Y
01|115744|1|3|max duty cycle 15% at max speed;|Y
01|115744|1|4|external coolant;|Y
01|115744|1|5|ref drwg# 00055685|Y
01|115744|1|6|Part# TBD MNL12-ER16Z-MS-HS|Y
01|115744|1|7|Mimatic Part# 194851|Y
01|115757|1|1|DUPLICATE PREVIOUS ORDER FOR SAME CUSTOMER|Y
01|115757|1|2|This will be for the Williams MANUFACTURING|Y
01|115757|1|3|3450 Sam Williams Dr Ogden UT 84401|Y
01|115757|1|6|INSTALLATION AT MC MACHINERY ELK GROVE IL|Y
01|115757|2|1|Installation includes: Drive unit short bar fiber|Y
01|115757|2|2|optic cable communications cable bulkhead cables|Y
01|115757|2|3|external cables parameter changes service time and|Y
01|115757|2|4|travel.|Y
01|115772|1|1|Special one time only pricing|Y
01|115780|1|1|Reference RGA# TAR-53757|Y
01|115780|1|2|5AX-350FA s/n: 3774 Brake is not holding.|Y
01|115780|26|1|To have table compeleted with 10 business days from|Y
01|115780|26|2|receipt.|Y
01|115787|5|1|POWER/FEEDBACK CABLE SET FOR 2 AXIS|Y
01|115807|1|1|*cross from NL3000-8435|Y
01|115823|5|1|POWER/FEEDBACK CABLE SET FOR ADDITIONAL AXIS|Y
01|115825|9|1|2 pots in taper of choice included at n/c|Y
01|115825|9|2|Please specify taper|Y
01|115826|1|1|MOTOR EXTERNAL CABLES INCLUDED|Y
01|115826|1|2|MACHINE MUST HAVE 4TH AXIS INSTALLED PRIOR|Y
01|115826|1|3|LYNDEX NIKKEN INSTALLATION OF ROTARY TO MACHINE|Y
01|115826|1|4|WITH PARAMETER CHANGES. PLEASE ADVISE SERIAL # PRIOR|Y
01|115832|2|1|** MT#3 sockets **|Y
01|115832|8|1|Qty of (2) for installation|Y
01|115832|8|2|Qty of (1) shown above for rotary table package|Y
01|115834|1|1|Tooling Certificate Number:  E1094-2225-020619|Y
01|115835|1|1|Reference RGA# TAR-53781|Y
01|115835|1|2|5AX-201 s/n: 5023 Excessive back lash.|Y
01|115835|30|1|9.990MM|Y
01|115841|2|1|ADDITIONAL 8 IN 10 DAYS|Y
01|115848|8|1|***June Release***|Y
01|115856|3|1|Installation includes: drive unit short bar fiber|Y
01|115856|3|2|optic cables communication cables bulk head cable|Y
01|115856|3|3|set external cable set parameter changes service|Y
01|115856|3|4|time and travel|Y
01|115857|8|1|***June Release***|Y
01|115864|2|1|Installation includes: drive unit short bar fiber|Y
01|115864|2|2|optic cables communication cables bulk head cable|Y
01|115864|2|3|set external cable set parameter changes service|Y
01|115864|2|4|time and travel|Y
01|115865|1|1|Model#: S.CAT50U-SYJ30-1.5-M12|Y
01|115865|1|2|Special ATC-ALIGN-CAT50 (Straight Pin Special Flange)|Y
01|115865|1|3|Pull Stud C50-4500 is not included.|Y
01|115865|1|4|Special Order. Unit Price Each.|Y
01|115865|2|1|with Pull Stud PS-53(CAT50 for TM)|Y
01|115865|2|2|Special Order. Unit Price Each.|Y
01|115865|3|1|with Pull Stud PS-53(CAT50 for TM)|Y
01|115865|3|2|Special Order. Unit Price Each. MOQ: 3|Y
01|115865|4|1|Special #50 Test bar No Flange Dia.60mm Length310mm|Y
01|115865|4|2|Pull Stud C50-4500 is not included.|Y
01|115865|4|3|Special Order. Unit Price Each.|Y
01|115865|5|1|Special #50 Test bar No Flange Dia.60mm Length310mm|Y
01|115865|5|2|Pull Stud C50-4500 is not included.|Y
01|115865|5|3|Special Order. Unit Price Each. MOQ: 3|Y
01|115865|6|1|for SPECIAL-TL(TEST BAR)|Y
01|115865|7|1|Special #50 Test bar No Flange Dia.60mm Length310mm|Y
01|115865|7|2|Special Order. Unit Price Each.|Y
01|115869|8|1|***June Release***|Y
01|115871|8|1|***June Release***|Y
01|115876|42|1|Torque Wrench is optional but recomended|Y
01|115913|1|1|SIMILAR TO CNC601TFA-M BUT FOR HAAS EC-1600ZT|Y
01|115913|1|2|WITH NEW GENERATION CONTROL|Y
01|115913|4|1|Cable set|Y
01|115942|7|1|Scale feedback +/- 3 sec|Y
01|115942|7|2|Scale control module|Y
01|115942|7|3|Scale mounting hardware|Y
01|115942|9|1|Includes bulkhead/external cables parameter changes|Y
01|115942|9|2|service time and travel.|Y
01|115949|1|1|Reference RGA# TOR-53662|Y
01|115949|1|2|BT40-Z12-130|Y
01|115949|2|1|Dis-assemble clean re-grease and re-assemble|Y
01|115958|1|1|We have 3 pc stock|Y
01|115958|2|1|We have 3 pc stock|Y
01|115958|4|1|MOQ 5 pcs Lead time is after drawing approval|Y
01|115958|8|1|MOQ 5 pcs|Y
01|115958|10|1|MOQ 5 pcs Lead time is after drawing approval|Y
01|115958|11|1|MOQ 5 Pcs.|Y
01|115958|13|1|3 Stock but Factory MOQ is 5|Y
01|115986|1|1|LT tool for Fuji TNW4500. ER32 IC Spindle Pitch 153.7mm|Y
01|115986|1|2|Special Order. Unit Price each|Y
01|115986|1|3|These items are considered specail and non-cancellable|Y
01|115989|1|1|EAKMS11014040  ADJUST COLLAR|Y
01|115992|1|1|This item is a non standard stock item and will not|Y
01|115992|1|2|be cancelable nor returnable once order is placed|Y
01|115992|1|3|Lead is 12-14 from receipt of order|Y
01|115993|1|1|w/PS-N46E Lock Bolt(Coolant Through)|Y
01|115993|1|2|Quoted as net pricing no returnable no cancellable|Y
01|115993|2|1|Parts#: S-NC5-46-FMA25.4CS-55-MA|Y
01|115993|2|2|w/PS-N46E Lock Bolt(Coolant Through)|Y
01|115993|2|3|Quoted as net pricing no returnable no cancellable|Y
01|115993|2|4|Note: Lock Bolt for ESR-63-10-I112653-N-N (AAC supply)|N
01|115993|4|1|w/PS-N46E|Y
01|115993|4|2|Quoted as net pricing no returnable no cancellable|Y
01|115993|5|1|w/PS-N46E|Y
01|115993|5|2|Quoted as net pricing no returnable no cancellable|Y
01|115993|7|1|w/PS-N46E|Y
01|115993|7|2|Quoted as net pricing no returnable no cancellable|Y
01|115993|9|1|w/PS-N46E|Y
01|115993|9|2|Quoted as net pricing no returnable no cancellable|Y
01|115993|11|1|w/PS-N46E|Y
01|115993|11|2|Quoted as net pricing no returnable no cancellable|Y
01|115993|13|1|w/PS-N46E|Y
01|115993|13|2|Quoted as net pricing no returnable no cancellable|Y
01|115993|14|1|w/PS-N46E|Y
01|115993|14|2|Quoted as net pricing no returnable no cancellable|Y
01|115994|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|115994|4|2|External Cables Service Time & Travel.|Y
01|116001|1|1|NOTE: Includes motor and free external cable set|Y
01|116001|3|1|Installer needs to provide actuator solenoid and wiring|Y
01|116001|3|2|from the machine to the tailstock|Y
01|116001|3|3|Proc Switch included for clamp/unclamp confirmation|Y
01|116001|3|4|that needs to be wired to machine M-Codes|Y
01|116001|4|1|Confirmation switch - two wires need to be connected to|Y
01|116001|4|2|machine M-Codes by installer|Y
01|116015|1|1|cross from CAT50-Z12-130U|Y
01|116015|2|1|*this is the only way it comes. std stock item in US|Y
01|116015|4|1|cross from ZKG12-12|Y
01|116015|5|1|cross from ZKG12-8|Y
01|116021|1|1|Non-returnablenon-cancelable|Y
01|116021|2|1|Modify to conform to form AD/B|Y
01|116025|4|1|for .250|Y
01|116034|1|1|made by our partner company Mimatic|Y
01|116061|7|1|Slotted arbor screws to be swapped w/standard nuts|Y
01|116068|1|1|Replacement Cable Set.|Y
01|116103|4|1|Offered as in stock option|Y
01|116103|6|1|This item is considered special once an order is|Y
01|116103|6|2|placed it cannot be cancelled or returned.|Y
01|116103|6|3|Net price has been quoted no further discounts|Y
01|116103|6|4|should be taken|Y
01|116103|20|1|Closeout All Sales Final! This kit includes 1 ea of:|Y
01|116103|20|2|010-EXT-100(1in Straight Shank 100DA Collet Extension)|Y
01|116103|20|3|010-SET-33  (33 pc set 1/16 - 9/16 x 64ths)|Y
01|116103|20|4|RACK-100DA/SK10|Y
01|116103|20|5|REGULAR PRICE - $590.00|Y
01|116103|27|1|Offered as in stock option|Y
01|116105|1|1|Reference RGA# TAR-53730|Y
01|116105|1|2|5AX-201FA s/n: 5306|N
01|116116|1|1|Reference RGA# TAR-53708|Y
01|116116|1|2|5AX-201ZA s/n: 1688|N
01|116116|34|1|Rotary spindle will need to be sent out to set|Y
01|116116|34|2|re-surface again.|Y
01|116143|1|1|NC5-46-SZF6C-90 w/ PS-123-AIR|Y
01|116143|1|2|NC5-46 SK6 Slim Chuck Bulls Eye Zero Fit Coolant|Y
01|116143|2|1|NC5-46-SZF10C-90w/ PS-123-AIR|Y
01|116143|2|2|NC5-46 SK10 Slim Chuck Bulls Eye Zero Fit Coolant|Y
01|116143|9|1|for C16|Y
01|116144|3|1|alt for NT05-024|Y
01|116144|5|1|Alt for SE1-10.0X8.0|Y
01|116147|1|1|Reference RGA# TAR-53795|Y
01|116147|1|2|CNC302MA s/n: 8777C Customer getting alarms.|Y
01|116147|18|1|Back face of spindle is damaged must be replated and|Y
01|116147|18|2|re-grinded.|Y
01|116156|1|1|Reference RGA# TAR-53726|Y
01|116156|1|2|CNCZ180LYA-BR s/n: 10037|N
01|116187|1|1|Face Value: $4000.00|Y
01|116206|1|1|Repair of 1x HSK63A-NPU13C-135|Y
01|116206|1|2|Please advised if customer would like to proceed with|Y
01|116206|1|3|the repair and we will issue RGA.|Y
01|116206|1|4|2nd unit is unrepairable.|Y
01|116212|15|1|Including coolant nuts|Y
01|116212|17|1|Including coolant nuts|Y
01|116212|20|1|Including coolant nuts|Y
01|116212|21|1|Non-returnablenon-cancelable|Y
01|116243|3|1|POSITIONING BLOCK FOR OKUMA 5 AXIS VMC|Y
01|116243|3|2|NET COST TO MORRIS SOUTH|Y
01|116245|1|1|Reference RGA# TOR-53686|Y
01|116245|1|2|1x CAT50-UMT200U|Y
01|116249|5|1|Line Item 5 (1 Keyless Drill Chuck)|Y
01|116260|3|1|PART # TO22326|Y
01|116260|5|1|PART # TTR-37.5X30X2-T174|Y
01|116260|5|2|Rotary Seal|Y
01|116260|6|1|PTR-37.5X30X0.8-A101|Y
01|116260|6|2|Rotary Seal|Y
01|116260|7|1|Part # STC-30|Y
01|116260|8|1|Part # BR42|Y
01|116260|9|1|Part # HMK3220|Y
01|116260|13|1|PART # AS568-177|Y
01|116266|2|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|116266|2|2|HW-CHK-ADAPTER-HS08-A25|Y
01|116270|5|1|Full set of cables|Y
01|116270|7|1|Sub-Plate|Y
01|116272|1|1|TC#20100-2185-122118|Y
01|116278|1|1|Tooling Certificate #19992-2299-041719|Y
01|116282|1|1|Reference RGA# LVR-53780|Y
01|116282|1|2|MZMP47-ER25X-OFF-HSC s/n: 8103701|Y
01|116282|1|3|(Mimatic# 124343)|Y
01|116282|2|1|Bearings seals o-rings and input spindle to be|Y
01|116282|2|2|replaced.|Y
01|116298|4|1|Full set of cables|Y
01|116298|10|1|1pc. stock remainder ETA TBD|Y
01|116308|2|1|Given in terms of NET price|Y
01|116308|4|1|This fully includes labor parts travel for a complete|Y
01|116308|4|2|5th Axis RT install.|Y
01|116308|5|1|2 full sets of cables|Y
01|116317|2|1|offered as in stk alternative|Y
01|116323|1|1|CAT45-SF1000-8.00CP|Y
01|116323|2|1|CAT45-SF1000-6.00CP|Y
01|116323|3|1|CAT45-SF1000-4.00CP|Y
01|116323|4|1|CAT45-SF0750-6.00CP|Y
01|116323|5|1|CAT45-SF0625-6.00CP|Y
01|116323|6|1|CAT45-22MM(0.866) FACE/SHELL MILL HOLDER|Y
01|116341|1|1|#30 Test Bar No Flange 305mm Metric Thread|Y
01|116341|1|2|AST30-TB30-305|Y
01|116341|1|3|Installed w/ PS-130E Pull stud|Y
01|116341|1|4|Quoted as NET pricing non-returnablenon-cancelable|Y
01|116341|2|1|Installed on AST30-TB30-305|Y
01|116341|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|116346|1|1|Reference RGA# LVR-53764|Y
01|116346|1|2|MZQT5-ER40X-OFF-C s/n: 51143 01|Y
01|116346|1|3|(Mimatic# 123690)|Y
01|116346|2|1|Bearings seals o-rings coolant bushing and|Y
01|116346|2|2|threadring to be replaced.|Y
01|116353|1|1|A questionnaire must be submitted and approved before|Y
01|116353|1|2|an order will be accepted|Y
01|116353|2|1|Position block may change based on make and model and|Y
01|116353|2|2|whether we or customer is making this block|Y
01|116358|1|1|Installation includes: drive unit short bar fiber|Y
01|116358|1|2|optic cables communication cables bulk head cable|Y
01|116358|1|3|set external cable set parameter changes service|Y
01|116358|1|4|time and travel|Y
01|116368|1|1|Reference RGA# TOR-53822|Y
01|116368|1|2|Repair of PF-2|Y
01|116368|3|1|Unit must be recalibrated.|Y
01|116371|1|1|Includes cables.|Y
01|116372|1|1|20 PCS each of(.531)(.484)(.422)|Y
01|116372|1|2|Non-returnablenon-cancelable|Y
01|116372|1|3|Quoted as NET pricing|Y
01|116372|1|4|Will be machined to slip fit|Y
01|116372|2|1|20 PCS each of (.781)(1.00)|Y
01|116372|2|2|Non-returnable non-cancelable|Y
01|116372|2|3|Quoted as NET pricing|Y
01|116372|2|4|Will be machined to slip fit|Y
01|116372|3|1|20 pcs each of (.281) (.296) (.156)|Y
01|116372|3|2|Non-returnablenon-cancelable|Y
01|116372|3|3|Quoted as NET pricing|Y
01|116372|3|4|Will be machined to slip fit|Y
01|116377|1|1|Reference RGA# TAR-53709|Y
01|116377|1|2|5AX-130ZA s/n: 3149 Tilt backlash is bad.|Y
01|116380|3|1|MOQ 5 pcs|Y
01|116380|3|2|Item is considered special once an order is placed|Y
01|116380|3|3|it cannot be cancelled or returned.|Y
01|116380|3|4|e|N
01|116388|1|1|Reference RGA# TAR-53809|Y
01|116388|1|2|TAT-200 s/n: 2088 Sent in for evaluation.|Y
01|116388|17|1|TA201R030: Cylinder Cover|Y
01|116398|1|1|ROTARY TABLE INCLUDES FACEPLATE WITH NO T-SLOTS|Y
01|116398|1|2|PART NUMBER FOR FACEPLATE IS CT200R030N|Y
01|116398|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR NIKKEN 4TH AXIS|Y
01|116398|4|1|$8500 PER TABLE IF NOT INSTALLED AT THE SAME TIME|Y
01|116424|1|1|MS100-53100: Hex Drive|Y
01|116424|2|1|S14-4D: O-Ring|Y
01|116424|3|1|MS100-52110: Cover|Y
01|116424|4|1|13B03006: Bolt|Y
01|116443|1|1|TCE-38145/0: Feedback cables|Y
01|116460|4|1|1 adapter sleeve for above boring holder|Y
01|116460|5|1|10mm adapter sleeve for above boring holder|Y
01|116460|6|1|12mm adapter sleeve for above boring holder|Y
01|116460|7|1|20mm adapter sleeve for above boring holder|Y
01|116460|8|1|25mm adapter sleeve for above boring holder|Y
01|116460|9|1|32mm adapter sleeve for above boring holder|Y
01|116473|2|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|116473|2|2|External Cables Service Time & Travel.|Y
01|116473|2|3|***Please Note: Installation pricing may vary pending|Y
01|116473|2|4|Technical Specifications from DMG Mori on Servo Amp|Y
01|116473|2|5|Cable Info and Drive Motor.|Y
01|116476|1|1|cross from 48-84530|Y
01|116476|3|1|cross from 410540001-50|Y
01|116476|3|2|**ext coolant|Y
01|116476|4|1|cross from 410540001-50|Y
01|116476|4|2|**version with Internal Coolant and can run dry|Y
01|116493|1|1|Reference RGA# LVR-53844|Y
01|116493|1|2|HA40-ER32X-4500RPM s/n: AL0035 (HAA00-11000S)|Y
01|116493|2|1|Spindle shaft gears drive shaft clutch bearings|Y
01|116493|2|2|seals collet nut & o-rings. Labor is included.|Y
01|116493|2|3|We may be able to re-use the spindle shaft; however we|Y
01|116493|2|4|will not be able to tell until unit is assembled and|Y
01|116493|2|5|tested.  If we are able to re-use the spindle the|Y
01|116493|2|6|price will be lower; we will advise at that time.|Y
01|116493|4|1|Replacement for RGA# LVR-53844|Y
01|116506|1|1|LIST PRICE WILL BE $47000 IF LYNDEX NIKKEN|Y
01|116506|1|2|PROVIDES ROTARY TABLE MOTOR.|Y
01|116506|1|3|PRICE LISTED OF $43000 IS ONLY IF TECHNITRON|Y
01|116506|1|4|SUPPLIES THE MOTOR.|Y
01|116506|2|1|WILL NEED A 100MM RISER BLOCK TO MATCH 310MM|Y
01|116506|2|2|CENTER HEIGHT OF THE CNC501 ROTARY TABLE.|Y
01|116506|3|1|HYDRAULIC UNIT FOR BRAKING/CLAMPING ON CNC501|Y
01|116506|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|116506|4|2|INCLUDED AT NO COST TO TECHNITRON OR NSI.|Y
01|116522|5|1|spanner wrench for collet chuck extension|Y
01|116522|9|1|wrench for collet nut|Y
01|116522|10|1|wrench for spindle|Y
01|116524|1|1|Installed with PS-868 at the factory|Y
01|116524|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|116524|2|1|Installed with PS-868 at the factory|Y
01|116524|2|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|116524|3|1|Installed with PS-868 at the factory|Y
01|116524|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|116524|4|1|Installed with PS-868 at the factory|Y
01|116524|4|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|116548|4|1|C8 Presetter Master Gauge|Y
01|116548|5|1|C8 Toolholding Fixture|Y
01|116550|2|1|NEED PO BY JUNE 12 FOR DELIVERY BY JUNE 26|Y
01|116550|2|2|SPINDLE IS IN STOCK IN ITALY.|Y
01|116562|1|1|gage length 60.96mm|Y
01|116562|2|1|*gage length of 124.96mm|Y
01|116562|2|2|Tension: 0.79|Y
01|116562|2|3|Compression: 0.39|Y
01|116567|4|1|**New CP spec. These will come with plugs to|Y
01|116567|4|2|plug the coolant ports Can be used for non-coolant|Y
01|116567|4|3|coolant through or coolant ports|Y
01|116579|1|1|INCLUDES CABLES AND MOTORS|Y
01|116579|3|1|INCLUDES MOTOR AND CABLES|Y
01|116583|1|1|Table to be procured as a backup prep with HYD brake|Y
01|116595|1|1|Reference RGA# TAR-53799|Y
01|116595|1|2|CNC180BFA s/n:10359|N
01|116603|5|1|HSK50A-C16-105|Y
01|116605|2|1|25pcs stock remaining balance ETA aprox. 6/28|Y
01|116605|4|1|1 $6 retention knob for every 1 toolholder purchased.|Y
01|116609|5|1|1 $6 retention knob for every 1 toolholder purchased.|Y
01|116614|1|1|1-9pcs 25% Qty Break price|Y
01|116614|1|2|10+ we will give 30%|Y
01|116623|1|1|Includes: two tables sheetmetal and cabling.|Y
01|116646|1|1|External Coolant - cross from MD DWO 1540132|Y
01|116646|4|1|*ICE version. Internal coolant and can run dry|Y
01|116654|11|1|blank disk to be machined to use with SK25-25.4 for|Y
01|116654|11|2|coolant thru|Y
01|116668|7|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|116668|7|2|External Cables Service Time & Travel.|Y
01|116687|1|1|NC5-63-HC32-90 W/PS-868 Pull Stud|Y
01|116687|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|116696|2|1|Includes Shrink Machine Cooling Unit Induction Rings|Y
01|116696|2|2|Cooling Brackets Storage Rack & (2)CAT40 Chuck Holders|Y
01|116696|3|1|Included with Shrink Fit Machine|Y
01|116700|1|1|Includes: 300MM rotary table Alpha controller|Y
01|116700|1|2|programming pendant power and feed back cable|Y
01|116700|1|3|M-code cable control power cable.|Y
01|116700|3|1|Installation of M-code: Machine must have an available|Y
01|116700|3|2|M-code.|Y
01|116731|1|1|Rotary Table Option for Air Purge|Y
01|116731|2|1|External Cable Set for two additional axis|Y
01|116731|3|1|4 port Rotary Joint/Union for 5AX-DD200-AF2|Y
01|116731|4|1|4+1 INSTALLATION INCLUDES CABLE BULKHEAD|Y
01|116731|4|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|116731|4|3|SERVO MOTORS AND WIRE HARNESS LABOR TRAVEL TRAINING|Y
01|116732|1|1|100 PC pricing|Y
01|116732|2|1|150 PC pricing|Y
01|116732|3|1|200 PC pricing|Y
01|116734|1|1|Includes Table Motor Pendant Power Cable M Code|Y
01|116734|1|2|Connector External Cables|Y
01|116734|2|1|MAX PSI 1000|Y
01|116744|1|1|200mm Face Plate 900Nm Clamping Force & 66.6 RPM Index|Y
01|116757|7|1|This item will have pluggable coolant ports|Y
01|116758|1|1|Back Mounted Motor|Y
01|116758|1|2|PRICE INCLUDES MOTOR; PART # CNC601BFA-M|Y
01|116758|3|1|Right Mounted Motor|Y
01|116758|9|1|Hydraulic Unit for Rotary Table|Y
01|116758|11|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|116758|13|1|ROTARY TABLE INSTALLATION INCLUDES:|Y
01|116758|13|2|4TH AXIS SERVO AMPLIFIER MOTOR WIRING FROM|Y
01|116758|13|3|ELECTRICAL CABINET TO BULKHEAD BULKHEAD CONNECTORS|Y
01|116758|13|4|AND TRAVEL EXPENSES FOR LYNDEX NIKKEN INSTALLER|Y
01|116772|1|1|Big Kaiser # BCV50-HMC1250-4|Y
01|116772|2|1|Big Kaiser # C1.250-1|Y
01|116772|3|1|Big Kaiser # C1.250-3/4|Y
01|116772|4|1|Big Kaiser # FK80-90|Y
01|116802|1|1|13687-1187-042018|Y
01|116804|4|1|Lines 2 and 3 are in stock options to supplement the|Y
01|116804|4|2|2ea in stock Ice versions.|Y
01|116811|1|1|UPS: 044444|Y
01|116825|7|1|Installation includes Servo Amp Bulkhead Cables|Y
01|116825|7|2|External Cables service time and travel.|Y
01|116826|1|1|HH90150 Y-2311-10 (Seal Kit)|Y
01|116826|1|2|Item is not a standard stock item and is considered a|Y
01|116826|1|3|special.  Once an order is placed this cannot be|Y
01|116826|1|4|cancelled or returned.|Y
01|116852|13|1|**Special- non-returnable/non-cancellable|Y
01|116865|22|1|Balluff chip + Install/re-balance:Balluff#BIS-C-122-04L|Y
01|116865|22|2|**Net price per  tool holder|Y
01|116868|1|1|HSK40E-HC0500-90|Y
01|116868|1|2|10-19 PC PRICING|Y
01|116868|1|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|116868|1|4|10 PCS ETA 2 WKSBALANCE ETA 10-11 WKS|Y
01|116868|2|1|HSK40E-HC0500-90|Y
01|116868|2|2|20+ PC PRICING|Y
01|116868|2|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|116868|2|4|10 PCS ETA 2 WKSBALANCE ETA 10-11 WKS|Y
01|116880|1|1|Table only motor/cables/motor cover from customer's|Y
01|116880|1|2|table|Y
01|116880|2|1|Table + motor cables/motor cover from customer's|Y
01|116880|2|2|table|Y
01|116884|6|1|2pcs stock Remainder ETA 8/07|Y
01|116885|6|1|2pcs stock Remainder ETA 8/07|Y
01|116893|8|1|Substitute for out of stock standar.This item is a|Y
01|116893|8|2|balancable version.If you want to sub all 3 we have stk|Y
01|116893|8|3|I can provide the 50% discount for the switch|Y
01|116902|1|1|Need control information as this may need a Mitsubishi|Y
01|116902|1|2|motor instead of Fanuc|Y
01|116902|3|1|Includes drive unit external cables interface cables|Y
01|116902|3|2|communications cable short bar travel labor|Y
01|116902|3|3|expenses|Y
01|116909|1|1|Warranty repair of CNCZ105LYA-M s/n: 3815F|Y
01|116909|1|2|Reference RGA# QUA-53854|Y
01|116909|5|1|Warranty repair|Y
01|116912|1|1|Reference RGA# TAR-53872|Y
01|116912|1|2|CNCZ180L w/ Controller|Y
01|116921|2|1|POWER/FEEDBACK CABLE SET FOR 2 AXIS|Y
01|116921|4|1|POWER/FEEDBACK CABLE SET FOR 1 AXIS|Y
01|116936|1|1|16C-diameter 1.132 +0.000 -0.002 3 slotted collet|Y
01|116939|1|1|*System#1 - works with TPT05 or T05 collets|Y
01|116940|2|1|TC#20880-2322-052219|Y
01|117007|59|1|Alt for SKN-10B(GH)|Y
01|117014|19|1|for 14mm / .5512|Y
01|117063|1|1|Reference RGA# TOR-53467|Y
01|117063|1|2|2x HSK100A-C42EX-135-IDU Sent in for evaluation.|Y
01|117065|9|1|(.177-.196)|Y
01|117065|10|1|(.236-.255)|Y
01|117065|11|1|(.314-.334)|Y
01|117065|12|1|(.374-.394)|Y
01|117065|13|1|(.433-.425)|Y
01|117065|14|1|(.492-.511)|Y
01|117065|15|1|(.551-.570)|Y
01|117065|16|1|(.610-.630)|Y
01|117065|17|1|(.669-.688)|Y
01|117065|18|1|(.748-.767)|Y
01|117065|19|1|(.866-.885)|Y
01|117065|20|1|(.984-1.00)|Y
01|117069|4|1|Special Order. Unit Price Each.|Y
01|117077|1|1|Reference RGA# TAR-53800|Y
01|117077|1|2|CNC180BFA s/n:10361|N
01|117111|4|1|Special PPC210D-3/QC/BP-HYD Precision Power Chuck|Y
01|117111|4|2|210mm diameter 3-jaw configuration|Y
01|117111|4|3|Self-contained hydraulically actuated design|Y
01|117111|4|4|Chuck to interface with hydraulic ports on face of rt|Y
01|117111|4|5|and includes a mounting plate with t-nuts|Y
01|117111|5|1|Installation includes: drive unit short bar fiber|Y
01|117111|5|2|optic cables communication cables bulk head cable|Y
01|117111|5|3|set external cable set parameter changes service|Y
01|117111|5|4|time and travel|Y
01|117114|1|1|** 1300 ft-lbs **|Y
01|117114|3|1|Installation includes: drive unit short bar fiber|Y
01|117114|3|2|optic cables communication cables bulk head cable|Y
01|117114|3|3|set external cable set parameter changes service|Y
01|117114|3|4|time and travel|Y
01|117116|1|1|** 3430 ft-lbs braking torque **|Y
01|117116|4|1|Installation includes: drive unit short bar fiber|Y
01|117116|4|2|optic cables communication cables bulk head cable|Y
01|117116|4|3|set external cable set parameter changes service|Y
01|117116|4|4|time and travel|Y
01|117116|6|1|76x26x2 base plate|Y
01|117134|4|1|PRICE BREAK FOR ADDITIONAL ATTACHMENT|Y
01|117134|7|1|NET CHARGE|Y
01|117139|1|1|In place of ZKG12-3/8U|Y
01|117143|1|1|Tooling Certificate Number:  E1094-2225-020619|Y
01|117151|1|1|Reference RGA# CUR-53595|Y
01|117151|1|2|E238 Screen|Y
01|117153|4|1|Depreciate Value due to damage done to the casting|Y
01|117153|4|2|Table cannot be sold as new item now.|Y
01|117157|1|1|Mimatic part# 124836 ICE Tool|Y
01|117157|1|2|HA40S-ER32X-ICE|Y
01|117157|1|3|Haas Live VDI40 X-Axis 90Deg ER32 SHORT coupling|Y
01|117157|1|4|104.85mm Int/Ext coolant 1015 PSI|Y
01|117157|1|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117157|2|1|Mimatic Part# 101174 External Coolant Tool|Y
01|117157|2|2|HA40S-ER32X|Y
01|117157|2|3|Haas Live VDI40 X-Axis 90Deg ER32 SHORT coupling|Y
01|117157|2|4|104.85 Ext coolant 1015 PSI|Y
01|117157|2|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117174|1|1|Includes Motor and Cables for Haas EC-1600.|Y
01|117193|1|1|Shrink Fit Package Pricing price includes 10 FREE|Y
01|117193|1|2|CAT40 Standard shrink fit holders of customers choice|Y
01|117196|3|1|H40E-SF0125-2.36|Y
01|117196|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117212|1|1|Reference RGA# TAR-53830|Y
01|117212|1|2|5AX-201YA s/n: 3654|N
01|117223|1|1|1-9pcs|Y
01|117223|4|1|10+pcs|Y
01|117224|1|1|With Allen Bradley Motor|Y
01|117224|2|1|With Allen Bradley Motor|Y
01|117224|3|1|External cables need wiring diagram|Y
01|117257|1|1|One time discount price for testing pre package buy|Y
01|117262|23|1|Position block made by L&N.|Y
01|117262|23|2|Spindle drawing confirmation required.|Y
01|117264|15|1|Knob promo price 1 per holder ordered.|Y
01|117267|2|1|Position Block needs to be confirmed prior to an order|Y
01|117267|11|1|Shrink Fit Package Pricing price includes 10 FREE|Y
01|117267|11|2|CAT40 Standard shrink fit holders of customers choice|Y
01|117272|2|1|Knob promo price is 1 per holder purchased.|Y
01|117273|3|1|11 ETA 7/19 balance of 9 pcs EOM 9/19|Y
01|117277|6|1|Wrenches at no charge with purchase of complete order.|Y
01|117277|7|1|Wrenches at no charge with purchase of complete order.|Y
01|117279|1|1|Reference RGA# CUR-53772|Y
01|117279|1|2|Sending H80FRAM-ER16-206ST s/n: 44608 01|Y
01|117279|1|3|(Mimatic#  167594)|Y
01|117279|2|1|Bearings seals o-rings and bevel gear to be replaced.|Y
01|117279|2|2|Resurface spindles as needed.|Y
01|117327|2|1|Flight/Hotel/Meals and any other Misc Expenses|Y
01|117328|7|1|Offering as an in stock option|Y
01|117328|17|1|New style will now come standard with coolant ports|Y
01|117350|2|1|HSK50A-SK20C-90|Y
01|117350|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117359|1|1|Long Motor Cover needed for existing longer motor|Y
01|117359|1|2|Delivery of cover 4-6 WEEKS from Nikken.|Y
01|117360|1|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|117360|1|2|Standard pitch (60)|Y
01|117360|2|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|117360|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117400|2|1|EXTERNAL POWER/FEEDBACK CABLE SET ( 2 AXIS)|Y
01|117400|3|1|INCLUDES DUAL 2 AXIS AMPLIFIERS SERVO MOTORSFIBRE|Y
01|117400|3|2|OPTIC CABLES ALL CONNECTOR/HARDWARE WIRE HARNESS|Y
01|117400|3|3|TRAVEL LABOR TRAINING|Y
01|117401|1|1|5AX-2MT-130-150YA-M|Y
01|117434|1|1|Reference RGA# TAR-53810|Y
01|117434|1|2|5AX-2002FA s/n: 2208 It seems to be off on the tilting|Y
01|117434|1|3|angle.  Tip the part at 90 and cut a flat and it is|Y
01|117434|1|4|not flat.|Y
01|117435|1|1|20 PCS total (2 sets)|Y
01|117435|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117435|3|1|6MP-C4(T2000Z) 10 PC SET|Y
01|117435|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117435|4|1|20 PCS Total 1PC/EA|Y
01|117435|4|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117437|1|1|C4001-1000-1.75CP  ETA 7/19|Y
01|117437|1|2|C4006-0250-2.50  ETA 7/9|Y
01|117437|1|3|C4006-1000-4.00 ETA 7/9|Y
01|117446|1|1|Tooling Certificate Number:5410-2337-060519|Y
01|117450|2|1|Installation includes:Drive unit short bar fiber|Y
01|117450|2|2|optic cable communications cable bulkhead cables|Y
01|117450|2|3|external cables parameter changes service time and|Y
01|117450|2|4|travel.|Y
01|117464|1|1|Reference RGA# TAB-53488|Y
01|117464|1|2|5AX-130FA s/n: 5411 Returning for credit|Y
01|117471|1|1|Installed with PS-N100VE at the factory|Y
01|117471|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117471|2|1|Installed w/ PS-N100VE|Y
01|117471|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117471|3|1|To be installed on NC5 holders above|Y
01|117473|3|1|Balance of 6 will have pluggable coolant ports.|Y
01|117473|4|1|New Style shell mill will come with coolant ports.|Y
01|117477|1|1|**Delivery 6-8 Weeks from layout approval and order|Y
01|117477|1|2|placement.|Y
01|117477|1|3|Does not qualify for tooling certificate promotion.|Y
01|117478|2|1|**Delivery 6-8 Weeks from layout approval and order|Y
01|117478|2|2|placement.|Y
01|117478|2|3|Does not qualify for tooling certificate promotion.|Y
01|117484|1|1|HSK125A-ER40-5.00-ID|Y
01|117484|1|2|HSK125A ER40 HiTorq Bearing Nut Collet Chuck ID chip|Y
01|117484|1|3|hole UNV#504|Y
01|117484|3|1|H125A-0500A-4.625-ID|Y
01|117484|3|2|HSK125A 1/2 End Mill Holder Aerospace|Y
01|117484|3|3|ID chip hole GKN UNV#463|Y
01|117484|5|1|H125A-0750A-5.75-ID|Y
01|117484|5|2|HSK125A 3/4 End Mill Holder Aerospace|Y
01|117484|5|3|ID chip hole GKN UNV#468|Y
01|117484|7|1|HSK125A-1000A-5.625-ID|Y
01|117484|7|2|HSK125A 1in End Mill Holder Aerospace|Y
01|117484|7|3|ID chip hole GKN UNV#472|Y
01|117484|9|1|HSK125A-1250A-5.625-ID|Y
01|117484|9|2|HSK125A 1.1/4 End Mill Holder Aerospace|Y
01|117484|9|3|ID chip hole GKN UNV#484|Y
01|117484|11|1|HSK125A-1500A-5.625-ID|Y
01|117484|11|2|HSK125A 1.1/2 End Mill Holder Aerospace|Y
01|117484|11|3|ID chip hole GKN UNV#274|Y
01|117484|13|1|HSK125A-2000A-5.50-ID|Y
01|117484|13|2|HSK125A 2in End Mill Holder Aerospace|Y
01|117484|13|3|ID chip hole GKN UNV#278|Y
01|117484|15|1|HSK125A-0375A-5.75-ID|Y
01|117484|15|2|HSK125A 3/8 End Mill Holder Aerospace|Y
01|117484|15|3|ID chip hole GKN#462|Y
01|117484|17|1|HSK125A 1 Stub Arbor Mill Holder|Y
01|117484|17|2|ID Chip Hole GKN UNV_451|Y
01|117484|17|3|Minimum Order 4 pieces.|Y
01|117484|21|1|H125A-SF0375-5.00-ID|Y
01|117484|21|2|HSK125A 3/8 Shrink Fit Holder ID chip hole|Y
01|117484|21|3|There might be overrun 1~2pcs at the end.|Y
01|117484|21|4|Minimum Order 4-Pieces|Y
01|117484|21|5|UNV#901>>No drawing provided by GKN|Y
01|117484|22|1|H125A-SF0375-5.00-ID|Y
01|117484|22|2|HSK125A 3/8 Shrink Fit Holder ID chip hole|Y
01|117484|22|3|Pricing reflects minimum order of 10 pieces.|Y
01|117484|22|4|UNV#901>>No drawing provided by GKN|Y
01|117484|24|1|H125A-SF0500-5.00-ID|Y
01|117484|24|2|HSK125A 1/2 Shrink Fit Holder ID chip hole|Y
01|117484|24|3|There might be overrun 1~2pcs at the end.|Y
01|117484|24|4|Minimum order 4 pieces|Y
01|117484|24|5|UNV#902>>No drawing provided by GKN|Y
01|117484|25|1|H125A-SF0500-5.00-ID|Y
01|117484|25|2|HSK125A 1/2 Shrink Fit Holder ID chip hole|Y
01|117484|25|3|Pricing reflects minimum order of 10 pieces.|Y
01|117484|25|4|UNV#902>>No drawing provided by GKN|Y
01|117484|27|1|H125A-SF0625-5.00-ID|Y
01|117484|27|2|HSK125A 5/8 Shrink Fit Holder ID chip hole|Y
01|117484|27|3|There might be overrun 1~2pcs at the end.|Y
01|117484|27|4|Minimum order 4 pieces.|Y
01|117484|27|5|UNV#903>>No drawing provided by GKN|Y
01|117484|28|1|H125A-SF0625-5.00-ID|Y
01|117484|28|2|HSK125A 5/8 Shrink Fit Holder ID chip hole|Y
01|117484|28|3|Pricing reflects minimum order of 10 pieces.|Y
01|117484|28|4|UNV#903>>No drawing provided by GKN|Y
01|117484|30|1|H125A-SF0750-5.00-ID|Y
01|117484|30|2|HSK125A 3/4 Shrink Fit Holder ID chip hole|Y
01|117484|30|3|There might be overrun 1~2pcs at the end.|Y
01|117484|30|4|Minimum Order 8 pieces|Y
01|117484|30|5|UNV#904>>No drawing provided by GKN|Y
01|117484|31|1|H125A-SF0750-5.00-ID|Y
01|117484|31|2|HSK125A 3/4 Shrink Fit Holder ID chip hole|Y
01|117484|31|3|Pricing reflects minimum order of 10 pieces.|Y
01|117484|31|4|UNV#904>>No drawing provided by GKN|Y
01|117484|33|1|H125A-SF1000-5.00-ID|Y
01|117484|33|2|HSK125A 1 Shrink Fit Holder ID chip hole|Y
01|117484|33|3|UNV#905>>No drawing provided by GKN|Y
01|117484|35|1|LN will provide a 10% random inspection of critical|Y
01|117484|35|2|features previously agreed upon by GKN.|Y
01|117484|35|3|An inspection report will be provided for this|Y
01|117484|35|4|sampling from the factory prior to shipment.|Y
01|117484|35|5|The inspection report will be used on all release|Y
01|117484|35|6|shipments from LN covered on the initial PO.|Y
01|117485|1|1|HSK125A-ER40-5.00-ID|Y
01|117485|1|2|HSK125A ER40 HiTorq Bearing Nut Collet Chuck ID chip|Y
01|117485|1|3|hole UNV#504|Y
01|117485|3|1|H125A-0500A-4.625-ID|Y
01|117485|3|2|HSK125A 1/2 End Mill Holder Aerospace|Y
01|117485|3|3|ID chip hole GKN UNV#463|Y
01|117485|6|1|H125A-0750A-5.75-ID|Y
01|117485|6|2|HSK125A 3/4 End Mill Holder Aerospace|Y
01|117485|6|3|ID chip hole GKN UNV#468|Y
01|117485|8|1|HSK125A-1000A-5.625-ID|Y
01|117485|8|2|HSK125A 1in End Mill Holder Aerospace|Y
01|117485|8|3|ID chip hole GKN UNV#472|Y
01|117485|10|1|HSK125A-1250A-5.625-ID|Y
01|117485|10|2|HSK125A 1.1/4 End Mill Holder Aerospace|Y
01|117485|10|3|ID chip hole GKN UNV#484|Y
01|117485|12|1|HSK125A-1500A-5.625-ID|Y
01|117485|12|2|HSK125A 1.1/2 End Mill Holder Aerospace|Y
01|117485|12|3|ID chip hole GKN UNV#274|Y
01|117485|14|1|HSK125A-2000A-5.50-ID|Y
01|117485|14|2|HSK125A 2in End Mill Holder Aerospace|Y
01|117485|14|3|ID chip hole GKN UNV#278|Y
01|117485|16|1|HSK125A-0375A-5.75-ID|Y
01|117485|16|2|HSK125A 3/8 End Mill Holder Aerospace|Y
01|117485|16|3|ID chip hole GKN#462|Y
01|117485|18|1|HSK125A 1 Stub Arbor Mill Holder|Y
01|117485|18|2|ID Chip Hole GKN UNV_451|Y
01|117485|18|3|Minimum Order 4 pieces.|Y
01|117485|22|1|H125A-SF0375-5.00-ID|Y
01|117485|22|2|HSK125A 3/8 Shrink Fit Holder ID chip hole|Y
01|117485|22|3|There might be overrun 1~2pcs at the end.|Y
01|117485|22|4|Minimum Order 4-Pieces|Y
01|117485|22|5|UNV#901>>No drawing provided by GKN|Y
01|117485|23|1|H125A-SF0375-5.00-ID|Y
01|117485|23|2|HSK125A 3/8 Shrink Fit Holder ID chip hole|Y
01|117485|23|3|Pricing reflects minimum order of 10 pieces.|Y
01|117485|23|4|UNV#901>>No drawing provided by GKN|Y
01|117485|25|1|H125A-SF0500-5.00-ID|Y
01|117485|25|2|HSK125A 1/2 Shrink Fit Holder ID chip hole|Y
01|117485|25|3|There might be overrun 1~2pcs at the end.|Y
01|117485|25|4|Minimum order 4 pieces|Y
01|117485|25|5|UNV#902>>No drawing provided by GKN|Y
01|117485|26|1|H125A-SF0500-5.00-ID|Y
01|117485|26|2|HSK125A 1/2 Shrink Fit Holder ID chip hole|Y
01|117485|26|3|Pricing reflects minimum order of 10 pieces.|Y
01|117485|26|4|UNV#902>>No drawing provided by GKN|Y
01|117485|28|1|H125A-SF0625-5.00-ID|Y
01|117485|28|2|HSK125A 5/8 Shrink Fit Holder ID chip hole|Y
01|117485|28|3|There might be overrun 1~2pcs at the end.|Y
01|117485|28|4|Minimum order 4 pieces.|Y
01|117485|28|5|UNV#903>>No drawing provided by GKN|Y
01|117485|29|1|H125A-SF0625-5.00-ID|Y
01|117485|29|2|HSK125A 5/8 Shrink Fit Holder ID chip hole|Y
01|117485|29|3|Pricing reflects minimum order of 10 pieces.|Y
01|117485|29|4|UNV#903>>No drawing provided by GKN|Y
01|117485|31|1|H125A-SF0750-5.00-ID|Y
01|117485|31|2|HSK125A 3/4 Shrink Fit Holder ID chip hole|Y
01|117485|31|3|There might be overrun 1~2pcs at the end.|Y
01|117485|31|4|Minimum Order 8 pieces|Y
01|117485|31|5|UNV#904>>No drawing provided by GKN|Y
01|117485|32|1|H125A-SF0750-5.00-ID|Y
01|117485|32|2|HSK125A 3/4 Shrink Fit Holder ID chip hole|Y
01|117485|32|3|Pricing reflects minimum order of 10 pieces.|Y
01|117485|32|4|UNV#904>>No drawing provided by GKN|Y
01|117485|34|1|H125A-SF1000-5.00-ID|Y
01|117485|34|2|HSK125A 1 Shrink Fit Holder ID chip hole|Y
01|117485|34|3|UNV#905>>No drawing provided by GKN|Y
01|117485|36|1|LN will provide a 10% random inspection of critical|Y
01|117485|36|2|features previously agreed upon by GKN.|Y
01|117485|36|3|An inspection report will be provided for this|Y
01|117485|36|4|sampling from the factory prior to shipment.|Y
01|117485|36|5|The inspection report will be used on all release|Y
01|117485|36|6|shipments from LN covered on the initial PO.|Y
01|117486|1|1|Non pluggable coolant ports are in stock now|Y
01|117486|1|2|Pluggable CP's ETA is 7/19|Y
01|117497|1|1|HFO TO SUPPLY MOTOR AND CABLES FOR LYNDEX TO INSTALL|Y
01|117497|1|2|2--4 WEEK DELIVERY|Y
01|117528|4|1|POPWER/FEEDBACK CABLE|Y
01|117529|1|1|Standard in stock length is 76.2mm or 3|Y
01|117535|7|1|Net price|Y
01|117535|10|1|Net price|Y
01|117536|1|1|We currently have 50pcs in stock|Y
01|117545|4|1|10 pc min|Y
01|117552|1|1|Discount reflects one time pricing|Y
01|117552|1|2|`|N
01|117552|2|1|Discount reflects one time pricing|Y
01|117558|1|1|based on standard pitch 60|Y
01|117587|14|1|Nut swap to be installed on CAT40-SK25-90U-IDU|Y
01|117587|14|2|Price is included in above toolholders price.|Y
01|117587|26|1|Nut swap to be installed on CAT40-SK25-90U-IDU|Y
01|117587|26|2|Price is included in above toolholders price.|Y
01|117587|44|1|Nut swap to be installed on CAT40-SK25-90U-IDU|Y
01|117587|44|2|Price is included in above toolholders price.|Y
01|117587|48|1|Nut swap to be installed on CAT40-SK25-90U-IDU|Y
01|117587|48|2|Price is included in above toolholders price.|Y
01|117589|5|1|2 full sets of cables|Y
01|117590|2|1|FOR MATSUURA VX-1000. MUST BE A 12 FOOT LENGTH|Y
01|117590|2|2|BOTH POWER/FEEDBACK TO BE 12 FOOT|Y
01|117592|1|1|ETA of Rotary Table aprox 6/28 ETA of motor is pending|Y
01|117592|1|2|based on confirmation of Machine Control Specificaitons|Y
01|117592|2|1|1 set of Rotary Table cables|Y
01|117592|3|1|COMPLETE 4TH AXIS INSTALLATION. SERVO MOTOR ADDITIONAL|Y
01|117592|3|2|AXIS DRIVE INTERNAL CABLES FIBRE OPTICS ALL|Y
01|117592|3|3|CONNECTORS TRAVEL AND LABOR|Y
01|117593|2|1|In stock substitute|Y
01|117594|3|1|SCALE FOR TILT AXIS|Y
01|117594|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|117594|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|117594|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|117594|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|117609|6|1|Minimum 3 pcs|Y
01|117613|2|1|Offere as an alternative with shorter lead time|Y
01|117615|1|1|CAT50 to Morse Taper 1 with a 6 gage line|Y
01|117615|3|1|CAT50 to Morse Taper 2 with a 6|Y
01|117615|5|1|CAT50 to Morse Taper 3 with a 6 gage|Y
01|117615|7|1|CAT50 to Morse Taper 4 with a 6|Y
01|117615|9|1|CAT50 to Morse Taper 5 with a 6 gage|Y
01|117633|1|1|6mm Coil - Sold in 1M lengths.|Y
01|117641|3|1|POWER/FEEDBACK CABLE|Y
01|117671|1|1|Air Brake Table AB|Y
01|117671|3|1|HEIDENHAIN SCALES ADDED TO TILT/ROTATE AXES|Y
01|117671|3|2|NET CHARGE FOR PARTS AND LABOR|Y
01|117671|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|117671|7|1|INSTALLATION INCLUDES: SERVO MOTORS & DRIVES FOR|Y
01|117671|7|2|4TH/5TH AXES ON FEELER VMP MACHINING CENTER|Y
01|117671|7|3|BULKHEAD CONNECTORS LABOR FOR INSTALLATION &|Y
01|117671|7|4|TRAVEL/LODGING EXPENSES FOR LYNDEX NIKKEN|Y
01|117671|7|5|INSTALL TECHNICIAN|Y
01|117676|2|1|HYDRAULIC UNIT FOR BETTER BRAKING/CLAMPING FORCE|Y
01|117676|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR NIKKEN 4TH AXIS|Y
01|117679|1|1|Includes D21 Chuck Hydraulic Pancake Cylinder Draw|Y
01|117679|1|2|bar and nose piece.|Y
01|117697|2|1|Corresponding Coolant Cap for CCK32-8|Y
01|117697|5|1|Corresponding Coolant Cap for CCK32-1|Y
01|117697|13|1|Disc/coolant cap wrench|Y
01|117715|1|1|CNC180FA(6+1PRJ)|Y
01|117715|1|2|CNC180FA Rotary table with Rotary Joint|Y
01|117726|2|1|Installation includes: drive unit short bar fiber|Y
01|117726|2|2|optic cables communication cables bulk head cable|Y
01|117726|2|3|set external cable set parameter changes service|Y
01|117726|2|4|time and travel|Y
01|117726|2|5|** Please submit data sheets at order placement **|Y
01|117728|7|1|ICE *Internal Coolant but can run dry*|Y
01|117733|2|1|We do not have the 3/4 size|Y
01|117733|4|1|We do not have a main sub|Y
01|117738|1|1|Ref. Mori part# N29108  **Side Through Spindle**|Y
01|117738|1|2|for Mori Super Mill 400AWC *BT40*  MAS-1|Y
01|117742|2|1|**Adapter needed to fit on either of the following:|Y
01|117742|5|1|*Can run dry|Y
01|117752|3|1|*wrench for BT40-C1-70|Y
01|117752|4|1|**Direct Chuck Coolant Cap for 1|Y
01|117752|4|2|**If they are using coolant through they will need|Y
01|117753|7|1|Will need to confirm before order what machine this is|Y
01|117753|7|2|for and if it needs a drive pin|Y
01|117755|1|1|Shrink Fit Package Pricing price includes 10 FREE|Y
01|117755|1|2|CAT40 Standard shrink fit holders of customers choice|Y
01|117755|3|1|Price of unit by itself|Y
01|117763|1|1|Reference RGA# TAR-53478|Y
01|117763|1|2|NST300 s/n: 2542|Y
01|117786|3|1|Installation of CNCZ180LAA21 x2 on Hyundai|Y
01|117786|3|2|2 tables on 1 machine - install RS232 + 2 M-codes|Y
01|117798|1|1|Shrink Fit Package Pricing price includes 10 FREE|Y
01|117798|1|2|BT40 Standard shrink fit holders of customers choice|Y
01|117806|1|1|Reference RGA# TOR-53899|Y
01|117806|1|2|Repair of PF-2|Y
01|117806|4|1|Labor qoted for re-calibration.|Y
01|117807|1|1|Tooling Certificate Number: 13198-1139-030818|Y
01|117808|1|1|Reference RGA# TAR-53890|Y
01|117808|1|2|CNC400HFA s/n: 6008 Table sent in for inspection|Y
01|117811|1|1|BT50-AF2-50-OH - (Back Spot Facing - Main Body)|Y
01|117811|2|1|BF250-52.38-80.96-50.8C -(Back Spot Facing-Arbor)|Y
01|117811|3|1|9BF250-52.38-80.96-50.8C-I - (Back Spot Facing - Byte)|Y
01|117811|4|1|AFC-20 - (Back Spot Facing - Insert chips)|Y
01|117812|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117812|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117812|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117812|4|1|ZKG24-18D|Y
01|117812|4|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117812|5|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|117815|1|1|16C SP Collet Dia. 0.821|Y
01|117815|1|2|Minimum Qty is 10pcs|Y
01|117816|3|1|Modify to coolant ports|Y
01|117816|4|1|Modify C4006-0500-2.50 with CP|Y
01|117816|4|2|NET PRICE/EA|Y
01|117816|5|1|Modify to coolant ports|Y
01|117816|6|1|Modify C4006-0625-3.00 to CP|Y
01|117816|6|2|NET PRICE/EA|Y
01|117817|3|1|POWER/FEEDBACK CABLE|Y
01|117823|2|1|Position Block needs to be confirmed prior to an order|Y
01|117825|1|1|Alt for ZKG12-1/2|Y
01|117825|2|1|Alt for ZKG12-1/2U|Y
01|117842|1|1|Reference RGA# CUR-53880|Y
01|117842|1|2|C40FHM-ER20-198-SP s/n: 46835 01 (Mim# 162800)|Y
01|117842|2|1|Replace ER20 Spindle along w/ the Bevel Gear set.|Y
01|117842|2|2|Replace all bearings seals & o-rings.|Y
01|117842|2|3|Labor is included|Y
01|117846|1|1|Reference RGA# LVR-53823|Y
01|117846|1|2|MNL12-ER11(X)-SUB-SP (Mim Part# 182355) s/n: 90712 01|Y
01|117846|2|1|Replace spindle bearings seals & o-rings|Y
01|117846|2|2|Labor is included.|Y
01|117846|4|1|Reference RGA# LVR-53823|Y
01|117846|4|2|MNL12-ER11(X)-SUB-SP (Mim Part# 182355) s/n: 61931 01|Y
01|117846|5|1|Replace damaged cover plate spindle and gear set.|Y
01|117846|5|2|Replace all bearings seals and o-rings.|Y
01|117846|5|3|Labor is included.|Y
01|117852|2|1|Price of unit by itself|Y
01|117852|4|1|Shrink Fit Package Pricing price includes 10 FREE|Y
01|117852|4|2|CAT40 standar shrink fit holders of customers choice|Y
01|117852|4|3|and 2 free pots|Y
01|117853|2|1|Wedge Plungers for HW-06-HS|Y
01|117864|1|1|Reference RGA# TOR-53877|Y
01|117864|1|2|Repair of PF-2|Y
01|117864|3|1|Item must be recalibrated.|Y
01|117866|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|117866|4|1|** Closeout Promotion! All sales are FINAL!**|Y
01|117866|10|1|Wrench for C5007-0040-4.00|Y
01|117866|13|1|** Closeout Promotion! All sales are FINAL!**|Y
01|117868|1|1|New dimension on PIN 18MM No O-Ring|Y
01|117875|10|1|Please advise the measurement of the original bearings|Y
01|117875|10|2|inside table to the third decimal place.  EX. 5.004|Y
01|117878|1|1|Reference RGA# LVR-53948|Y
01|117878|1|2|MNL12-ER32X-ICE-10K s/n: 84492 05|Y
01|117878|1|3|(Mimatic# 100876)|Y
01|117878|2|1|Bearings seals and o-rings to be replaced.|Y
01|117908|4|1|10 HYDRAULIC 3 JAW SMW AUTOBLOCK CHUCK|Y
01|117908|4|2|DRAWTUBE; CYLINDER; ADAPTER PLATE|Y
01|117908|4|3|INSTALLED ON CNC260|Y
01|117908|5|1|INCLUDES INSTALLATION OF HYDRAULIC UNIT AND REQUIRED|Y
01|117908|5|2|SERVO DRIVES|Y
01|117908|6|1|POWER AND POSITION FEED BACK CABLES AND HYDRAULIC|Y
01|117908|6|2|HOSE|Y
01|117908|7|1|FOOT PEDAL ACTUATION INTEGRATION|Y
01|117912|2|1|Includes: dual axis drive external cables interface|Y
01|117912|2|2|cables short bar communications cable fiber optic|Y
01|117912|2|3|cable ferrite travel labor expenses|Y
01|117912|2|4|Note: this does not include Fanuc 4th/5th axis options|Y
01|117915|1|1|Standard non dual taper substitute|Y
01|117916|2|1|** Closeout Promotion! All sales are FINAL!**|N
01|117916|6|1|** Closeout Promotion! All sales are FINAL!**|Y
01|117917|1|1|Item is non standard stock and will not be cancellable|Y
01|117917|1|2|nor returnable once an order is placed|Y
01|117919|1|1|PRICE INCLUDES 10 HOLDERS|Y
01|117933|4|1|Optional|Y
01|117933|9|1|Optional|Y
01|117947|1|1|TABLE WITHOUT MOTOR|Y
01|117947|3|1|TABLE INCLUDES SERVO MOTOR|Y
01|117947|5|1|EXTERNAL POWER/FEEDBACK CABLE SET COMPLETE|Y
01|117947|12|1|MANUAL 9 SCROLL CHUCK|Y
01|117947|14|1|AIR/HYD BOOSTER FOR BRAKE/ OPTIONAL. DEPENDS ON|Y
01|117947|14|2|APPLICATION FOR GREATER BRAKE TORQUE SEE SPEC|Y
01|117952|1|1|C40FHM-SK16-195IC-65TP|Y
01|117952|1|2|Universal Flex-Head SK16 Coolant Through|Y
01|117952|1|3|Special Order. Unit Price Each.|Y
01|117952|2|1|C40FHM-SK16-195IC-65TP|Y
01|117952|2|2|Universal Flex-Head SK16 Coolant Through|Y
01|117952|2|3|Special Order. Unit Price Each. MOQ: 2|Y
01|117957|5|1|This will work with the customer's existing Nikken Z12|Y
01|117957|5|2|holder|Y
01|117962|9|1|LN will provide a 10% random inspection of critical|Y
01|117962|9|2|features previously agreed upon by GKN.|Y
01|117962|9|3|An inspection report will be provided for this|Y
01|117962|9|4|sampling from the factory prior to shipment.|Y
01|117965|1|1|MODIFY TO DIN ETA 2 WKS|Y
01|117965|1|2|Non-returnable non-cancelable|Y
01|117965|2|1|MODIFY TO DIN 3 ETA 7/3 BAL 2-3WKS|Y
01|117965|2|2|Non-returnablenon-cancelable|Y
01|117965|3|1|MODIFY TO DIN 3 PC ETA 7/3 2 PCS ETA 2-3 WKS|Y
01|117985|1|1|HFO to supply Motor and Cables|Y
01|117989|1|1|WITH SERVO MOTOR|Y
01|117989|3|1|WITHOUT SERVO MOTOR|Y
01|117989|5|1|POWER/FEEDBACK CABLES|Y
01|117997|1|1|Installed with PS-17 at the factory|Y
01|117997|1|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|117997|2|1|Installed with BT30-TB40-150 at the factory|Y
01|117997|2|2|Quoted as net pricingnon-returnablenon-cancelable|Y
01|117998|1|1|**Includes 2x Shrink Fit Chuck Pots|Y
01|117998|1|2|Specify Taper Size at time of order|Y
01|118025|1|1|Tooling Certificate #13687-2284-032819|Y
01|118027|1|1|13687-2255-030519 & 13687-2256-030519|Y
01|118049|1|1|Length is 76.2mm|Y
01|118069|3|1|may substitute this on as in stock|Y
01|118082|1|1|Tooling Certificate Number: E1094-2175-121218|Y
01|118087|4|1|New Standard will have coolant ports|Y
01|118087|6|1|New Standard will have coolant ports|Y
01|118087|7|1|New Standard will have coolant ports|Y
01|118087|7|2|Balance of 5 pcs ETA Early October|Y
01|118087|8|1|New Standard will have coolant ports|Y
01|118087|10|1|New Standard will have coolant ports|Y
01|118090|5|1|PA110-CAT also is available|Y
01|118090|6|1|Note the blank quoted above is special made|Y
01|118090|6|2|There is  a second option of making you own.|Y
01|118095|1|1|Alpha2/2000 motor A06B-0372-B075|Y
01|118100|5|1|TMX #3-950-LRT 12 3-Jaw Big-Bore Steel Chuck Package|Y
01|118109|3|1|In stock option in longer length to holder above|Y
01|118158|4|1|This will come with Pluggable coolant ports.|Y
01|118158|6|1|This will come with Pluggable coolant ports.|Y
01|118158|7|1|This is the old standard no CP's at all.|Y
01|118158|9|1|This will come with Pluggable coolant ports.|Y
01|118188|1|1|*******Part number referrenced by customer is|Y
01|118188|1|2|HSK63A-FMH25.4A-60-60-H****|Y
01|118189|1|1|Tooling Certificate #13170-2113-092618|Y
01|118191|3|1|Max 15K RPM's!!|Y
01|118191|3|2|`|N
01|118191|6|1|MAX RPM IS 10K on this holder!!!!!|Y
01|118192|2|1|This nut to be installed on to the above holder|Y
01|118192|2|2|BT30-SK6-90|Y
01|118198|2|1|Offered as an in stock option|Y
01|118209|1|1|Requires 500psi hydraulic source for clamping|Y
01|118209|1|2|Table is in stock additional lead time is necessary|Y
01|118209|1|3|for mounting components for Allen Bradley motor|Y
01|118210|6|1|COST INCLUDES REQUIRED SERVO AMPS INTEGRATION AND|Y
01|118210|6|2|ALL TRAVEL EXPENSES|Y
01|118210|6|3|COST IS NET TO HILLARY|Y
01|118210|7|1|COMPLEMENTARY TOOL CERT WITH PURCHASE OF TABLE|Y
01|118222|1|1|Ref. old part# C50FHM-ER25-195C|Y
01|118222|1|2|Ref. Mimatic part# 135839|Y
01|118222|3|1|Lyndex-Nikken to make position block upon receipt of|Y
01|118222|3|2|Spindle Drawing specs|Y
01|118222|3|3|**NET PRICE - Takes place of old part# PB-RAM50|Y
01|118225|6|1|Replaces CN103R007|Y
01|118227|23|1|Position block made by L&N.|Y
01|118227|23|2|Spindle drawing confirmation required.|Y
01|118235|1|1|SIMILAR TO BUT FOR MITS CONTROL|Y
01|118235|3|1|SCALE FOR TILT AXIS|Y
01|118235|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|118235|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|118235|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|118235|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|118240|2|1|Installation includes: Drive unit short bar fiber|Y
01|118240|2|2|optic cables communications cables external cables|Y
01|118240|2|3|bulkhead cables parameter changes service time and|Y
01|118240|2|4|travel.|Y
01|118271|1|1|HIGH COLUMN TABLE ALLOWS ROOMS FOR INSTALL OF|Y
01|118271|1|2|GLASS SCALES|Y
01|118271|2|1|GLASS SCALES ON TILT/ROTARY AXES; $25000 NET CHARGE|Y
01|118271|4|1|INSTALLATION INCLUDES: SERVO MOTORS/DRIVES|Y
01|118271|4|2|BULKHEAD CONNECTORS TRAVEL EXPENSES FOR LN INSTALLER|Y
01|118275|9|1|Works with SK20|Y
01|118302|1|1|CAT50 AGH 16mm side lock A=110mm d=20mm L=490.5mm|Y
01|118302|1|2|L1=355mm 3 pins support hand load; no ATC 1:1 gear|Y
01|118302|1|3|ratio max 30Nm 8000RPM Ext/Int coolant ready|Y
01|118302|1|4|1015 PSI ref drwg#00031717A-19105345|Y
01|118302|2|1|Quatity break 2 pieces|Y
01|118316|2|1|Alt for A20MM-P2.5|Y
01|118339|2|1|Lyndex-Nikken will make this block.|Y
01|118339|2|2|Delivery is from receipt of spindle drawing|Y
01|118339|2|3|confirmation.|Y
01|118339|2|4|*NET PRICE|Y
01|118342|1|1|HFO Tampa to supply correct motors|Y
01|118342|1|2|HFO Tampa to supply cables|Y
01|118342|1|3|SPECIAL DEMO DAY PRICING|Y
01|118342|3|1|COLLET CHUCK PROMO KIT|Y
01|118342|3|2|NO CHARGE|Y
01|118354|2|1|Chip + Installation / Re-Balance not required.|Y
01|118363|5|1|PRICE INCLUDES SERVO AMP FOR EACH TILT AND ROTATE|Y
01|118363|5|2|AXIS. ALL TRAVEL EXPENSES MISC ITEMS FOR PROFFESIONAL|Y
01|118363|5|3|INSTALL.|Y
01|118364|2|1|Installation includes: drive unit short bar fiber|Y
01|118364|2|2|optic cables communication cables bulk head cable|Y
01|118364|2|3|set external cable set parameter changes service|Y
01|118364|2|4|time and travel|Y
01|118365|2|1|Installation includes: drive unit short bar fiber|Y
01|118365|2|2|optic cables communication cables bulk head cable|Y
01|118365|2|3|set external cable set parameter changes service|Y
01|118365|2|4|time and travel|Y
01|118373|1|1|** 3430 ft-lbs braking torque **|Y
01|118373|4|1|Installation includes: drive unit short bar fiber|Y
01|118373|4|2|optic cables communication cables bulk head cable|Y
01|118373|4|3|set external cable set parameter changes service|Y
01|118373|4|4|time and travel|Y
01|118373|6|1|76x26x2 base plate|Y
01|118376|2|1|NET PRICE|Y
01|118386|1|1|Quoted as NET pricing|Y
01|118386|2|1|Quoted as NET pricing|Y
01|118395|2|1|C5016-0437-4.00 modified to Coolant Port capable|Y
01|118395|2|2|Lead time will be about 10-12 days|Y
01|118397|9|1|Works with SK20|Y
01|118405|2|1|Offered this as in stock option|Y
01|118411|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|118411|5|1|** Closeout Promotion! All sales are FINAL!**|Y
01|118411|6|1|** Closeout Promotion! All sales are FINAL!**|Y
01|118411|7|1|** Closeout Promotion! All sales are FINAL!**|Y
01|118411|8|1|** Closeout Promotion! All sales are FINAL!**|Y
01|118422|2|1|Installation: Using DDR drive bulkhead cables|Y
01|118422|2|2|external cables parameter changes service time and|Y
01|118422|2|3|travel.|Y
01|118446|1|1|Reference RGA# TAR-53986|Y
01|118446|1|2|TAT-170 s/n: 1871|N
01|118446|20|1|One time courtesy.|Y
01|118446|20|2|List price less 35% for a new unit.|Y
01|118484|3|1|EXTERNAL POWER CABLE FOR ROBODRILL|Y
01|118484|4|1|EXTERNAL FEEDBACK CABLE FOR ROBODRILL|Y
01|118491|1|1|Face Value of $10000.00|Y
01|118495|6|1|Positioning blocks are required per machine.|Y
01|118495|6|2|Austin Machine can make their own position blocks or|Y
01|118495|6|3|Lyndex-Nikken can make the blocks.  $700.00ea.|Y
01|118495|6|4|**Delivery is about 1 week from receipt of spindle|Y
01|118495|6|5|drawing.|Y
01|118513|1|1|1x used for machine/ 1x used for cooling station|Y
01|118519|1|1|Tooling Certificate Number:  13430-928-03117RT|Y
01|118537|1|1|**Closeout Promotion! All sales are FINAL!**|Y
01|118537|1|2|Please sell to EU at the net price of $269.00|Y
01|118548|2|1|Warranty replacement for 1x SK20-13 shipped on|Y
01|118548|2|2|Inv# 2229731.  Customer received the unit broken.|Y
01|118548|2|3|RGA# QUA-54019 has been issued for the return of the|Y
01|118548|2|4|broken unit.|Y
01|118554|4|1|This will come with Pluggable coolant ports.|Y
01|118554|6|1|This will come with Pluggable coolant ports.|Y
01|118554|7|1|This is the old standard no CP's at all.|Y
01|118554|9|1|This will come with Pluggable coolant ports.|Y
01|118554|19|1|Our New standard will now come with coolant ports|Y
01|118557|1|1|Reference RGA# TAR-53978|Y
01|118557|1|2|5AX-350-RCN2-RJ6 s/n: 3589 Table was crashed at 90 deg|Y
01|118557|1|3|Now getting tilt axis overload alarms.|Y
01|118562|2|1|Alternative to C5005-1375-7.72|Y
01|118562|2|2|Special Price pending|Y
01|118569|5|1|$5 Pull Stud promo with Holder purchase|Y
01|118601|2|1|BF140-D-D-T|Y
01|118601|2|2|Changeable arbor for automatic back spot facing arbor|Y
01|118617|1|1|REference RGA# QUA-53840|Y
01|118617|1|2|MZQT5-ER32Z-MS-ICE s/n: 97881 03|Y
01|118617|1|3|(Mimatic# 182142)|Y
01|118617|2|1|Coolant bushings and related seals to be replaced.|Y
01|118618|13|1|COMMUNICATIONS CABLE  A660-2005-T626/L150R0A|Y
01|118624|4|1|Please verify if need DIN|Y
01|118634|1|1|Prepared with SIGMA 5 motors. To also include USB drive|Y
01|118634|1|2|with CORRECT PARAMETERS and air lines when shipping.|Y
01|118636|10|1|$ 5.00 PULLSTUD PROMO. EVERY HOLDER RECEIVE $5.00 PS|Y
01|118638|6|1|HIGH SPEED/ LEFT HAND MODEL WE THE LAST 10' TABLES|Y
01|118638|6|2|PURCHASED BY KNIGHTS FOR MATSUURAS|Y
01|118638|6|3|ALSO m SIGNIFIES MITSUBISHI MOTORS WITH SLIGHTLY|Y
01|118638|6|4|HIGHER COST|Y
01|118638|8|1|RIGHT HAND MODEL|Y
01|118638|10|1|HIGH SPEED RIGHT HAND|Y
01|118676|2|1|Installation includes: drive unit short bar fiber|Y
01|118676|2|2|optic cables communication cables bulk head cable|Y
01|118676|2|3|set external cable set parameter changes service|Y
01|118676|2|4|time and travel|Y
01|118680|2|1|Heidenhain Scale with mounting kit +/-3|Y
01|118680|4|1|Installation includes: Drive unit short bar fiber|Y
01|118680|4|2|optic cable communications cable bulkhead cables|Y
01|118680|4|3|external cables parameter changes service time and|Y
01|118680|4|4|travel.|Y
01|118702|1|1|NCAT40-MMC4-150U-IDU|Y
01|118702|2|1|NCAT40-MMC8C-150U-IDU|Y
01|118712|3|1|ETA and PRICE PENDING will confirm asap|Y
01|118712|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|118718|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|118738|1|1|2pcs stock remaining balance ETA 08/20|Y
01|118738|2|1|7pcs stock remaining balance ETA aprox 09/04|Y
01|118740|3|1|Warranty replacement for missing item shipped on|Y
01|118740|3|2|inv# 2230235.|Y
01|118746|4|1|P/N: 180356  Torque Wrench|Y
01|118746|5|1|P/N: 173985  Socket Wrench|Y
01|118746|6|1|P/N: 166774   Tool Clamper|Y
01|118746|7|1|P/N: 166775   Tool Clamper|Y
01|118746|10|1|P/N: 171839|Y
01|118754|10|1|No Torque Wrench Adapter for MMC Holders|Y
01|118754|15|1|Alternative option for NCAT|Y
01|118754|15|2|enough stock for balance|Y
01|118754|18|1|ALT to NCAT enough stock for balance|Y
01|118754|19|1|ALT to NCAT 18 PCS avail|Y
01|118754|30|1|SKJ6-1/16|Y
01|118754|31|1|SKJ6-3/32|Y
01|118754|73|1|207 Pull Studs; 1 Per Holder|Y
01|118754|74|1|Extra 140 Pull Studs Requested|Y
01|118754|93|1|Coolant-Thru Backup Screws for 1 Milling Chucks|Y
01|118757|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|118757|4|1|5C COLLET CHUCK|Y
01|118757|4|2|RISER TUBE|Y
01|118757|4|3|DRAW TUBE|Y
01|118757|4|4|5C NOSE PIECE|Y
01|118757|4|5|SIMILAR TO 5AX-EXT-5AX2002-SP|Y
01|118757|7|1|HYD LINES/FITTINGS FOR 5C HYD SYSTEM|Y
01|118763|2|1|Will mark cust part# TAM211014 on item and container|Y
01|118764|5|1|Quoted as an in stock option.|Y
01|118788|1|1|Please Note: This holder is DIN coolant thru the|Y
01|118788|1|2|flange and only used on Mori Seiki machine with DIN|Y
01|118788|1|3|option. Once the holder is put into the spindle it|Y
01|118788|1|4|cannot be returned.|Y
01|118794|4|1|Installation includes: Drive unit short bar fiber|Y
01|118794|4|2|optic cable communications cable bulkhead cables|Y
01|118794|4|3|external cables parameter changes service time and|Y
01|118794|4|4|travel.|Y
01|118794|5|1|PBA-135 confirmation switch with cover.|Y
01|118805|3|1|This item only available in coolant|Y
01|118805|20|1|This item only available in coolant|Y
01|118819|1|1|AC4-ECH16F-50|Y
01|118825|3|1|THIS IS 1.1/2 SIZE. CATALOG ATTACHED SHOWS|Y
01|118830|1|1|RFID Chip Model 1778 R/W Installed and holder|Y
01|118830|1|2|re-balanced.|Y
01|118856|2|1|Use A22/4000is Motor|Y
01|118856|2|2|Cabling to be connected to the back side of table|Y
01|118861|1|1|Reference RGA# CUR-53936|Y
01|118861|1|2|C50-MRAM-IC s/n: 94386 03 (Mim# 162814)|Y
01|118861|2|1|CAT50 spindle must be replated and grounded.|Y
01|118861|2|2|All bearings seals and o-rings must be replaced.|Y
01|118861|2|3|Includes Labor.|Y
01|118871|1|1|#9 Draw Screw for H05M8|Y
01|118873|1|1|Reference RGA# CUR-53947|Y
01|118873|1|2|C50-MRAM-IC s/n: 64878 02 (Mim# 162814)|Y
01|118873|2|1|CAT50 spindle bearings seals & o-rings must all be|Y
01|118873|2|2|replaced. Labor is included.|Y
01|118873|4|1|MRAM-ER25ST s/n: 75546 01 (Mim# 178049)|Y
01|118873|5|1|Replace housing cover plate bearings seals & o-rings|Y
01|118873|5|2|Labor is included.|Y
01|118874|2|1|POWER/FEEDBACK CABLE SET FOR 2 AXIS|Y
01|118874|3|1|Installation includes: drive unit short bar fiber|Y
01|118874|3|2|optic cables communication cables bulk head cable|Y
01|118874|3|3|set external cable set parameter changes service|Y
01|118874|3|4|time and travel|Y
01|118875|7|1|NET COST|Y
01|118875|8|1|MZQT47-ER25Y-MD-C|Y
01|118875|8|2|ER25 Y AXIS Main Duel Coolant Thru Live Tool|Y
01|118875|8|3|NET PRICE|Y
01|118877|2|1|POWER/FEEDBACK CABLE SET FOR 2 AXIS|Y
01|118877|3|1|Installation includes: drive unit short bar fiber|Y
01|118877|3|2|optic cables communication cables bulk head cable|Y
01|118877|3|3|set external cable set parameter changes service|Y
01|118877|3|4|time and travel|Y
01|118887|1|1|This item is non-standard stock and considered special|Y
01|118887|1|2|Once an order is placed it may not be cancelled or|Y
01|118887|1|3|returned.|Y
01|118915|1|1|Part number TBD>>HA40M-SK20X-ICE-HS Mimatic #195101|Y
01|118915|1|2|HAAS Live 90deg; medium coupling; SK20;1:2 Gear|Y
01|118915|1|3|max input 6000; max output 12000 RPM;max 25Nm torque;|Y
01|118915|1|4|Int/ Ext coolant 1015 PSI; Ref drwg # 00055931|Y
01|118915|1|5|Machine:HAAS DS 30|Y
01|118915|2|1|Part number TBD>>HA40M-SK20X-ICE-HS Mimatic #195101|Y
01|118915|2|2|HAAS Live 90deg; medium coupling; SK20;1:2 Gear|Y
01|118915|2|3|max input 6000; max output 12000 RPM;max 25Nm torque;|Y
01|118915|2|4|Int/ Ext coolant 1015 PSI; Ref drwg # 00055931|Y
01|118915|2|5|Machine:HAAS DS 30|Y
01|118915|3|1|Part number TBD>>HA40M-SK20X-ICE-HS Mimatic #195101|Y
01|118915|3|2|HAAS Live 90deg; medium coupling; SK20;1:2 Gear|Y
01|118915|3|3|max input 6000; max output 12000 RPM;max 25Nm torque;|Y
01|118915|3|4|Int/ Ext coolant 1015 PSI; Ref drwg # 00055931|Y
01|118915|3|5|Machine: Haas DS30|Y
01|118915|5|1|HAAS Live Straight offset; medium coupling; SK20;|Y
01|118915|5|2|1:2 Gear max input 5750; max output 11500 RPM;|Y
01|118915|5|3|max 40Nm torque;Int/ Ext coolant 1015 PSI;|Y
01|118915|5|4|Ref drwg # 00055922|Y
01|118915|5|5|Machine: Haas DS30|Y
01|118915|6|1|HAAS Live Straight offset; medium coupling; SK20;|Y
01|118915|6|2|1:2 Gear max input 5750; max output 11500 RPM;|Y
01|118915|6|3|max 40Nm torque;Int/ Ext coolant 1015 PSI;|Y
01|118915|6|4|Ref drwg # 00055922|Y
01|118915|6|5|Machine: Haas DS30|Y
01|118915|7|1|HAAS Live Straight offset; medium coupling; SK20;|Y
01|118915|7|2|1:2 Gear max input 5750; max output 11500 RPM;|Y
01|118915|7|3|max 40Nm torque;Int/ Ext coolant 1015 PSI;|Y
01|118915|7|4|Ref drwg # 00055922|Y
01|118915|7|5|Machine: Haas DS30|Y
01|118922|1|1|Special Test Bar|Y
01|118922|1|2|Special Order. Unit Price Each.|Y
01|118932|6|1|Please Note: Pricing reflects knob promo. Buy a holder|Y
01|118932|6|2|and get a matching taper knob for $5.00 net.|Y
01|118933|1|1|Quoted as NET pricing|Y
01|118940|16|1|New Standard shell mills will come with coolant ports|Y
01|118940|17|1|New Standard shell mills will come with coolant ports|Y
01|118940|48|1|New Standard will have pluggable coolant ports|Y
01|118940|50|1|New Standard will have pluggable coolant ports|Y
01|118940|52|1|New Standard will have pluggable coolant ports|Y
01|118940|55|1|This stud not included in Pull Stud Promo|Y
01|118949|2|1|Price break if 2 pcs are ordered.|Y
01|118949|6|1|Price break if 2 pcs are ordered.|Y
01|118954|2|1|Pluggable Coolant Ports|Y
01|118954|4|1|Pluggable Coolant Ports|Y
01|118956|1|1|Tooling Certificate Number: E1094-2225-020619|Y
01|118957|1|1|CNCZ105YA-M install|Y
01|118973|1|1|Item is considered a non standard stock special item|Y
01|118973|1|2|which is non cancellable nor returnable|Y
01|118975|1|1|Item is considered non standard stock and is not|Y
01|118975|1|2|cancellable nor returnable once ordered|Y
01|118989|9|1|Offered as an in stock option.|Y
01|118989|9|2|** Closeout Promotion! All sales are FINAL!**|Y
01|118989|18|1|New standard includes coolant ports|Y
01|118989|21|1|** Closeout Promotion! All sales are FINAL!**|Y
01|118989|23|1|** Closeout Promotion! All sales are FINAL!**|Y
01|119006|12|1|HAS COUNTERBORE FOR CHIP INSTALLATION|Y
01|119006|20|1|ALREADY HAS CHIP INSTALLED|Y
01|119008|6|1|CONFIRM CABLE LENGTH|Y
01|119008|7|1|CONFIRM CABLE LENGTH|Y
01|119060|1|1|C4-SZF16S-55-A|Y
01|119060|1|2|C4 Shank SK16 Slim Chuck BullsEye ZeroZero Fit|Y
01|119060|1|3|Special Order. Unit Price Each. MOQ:1|Y
01|119060|2|1|C4-SZF16S-55-A|Y
01|119060|2|2|C4 Shank SK16 Slim Chuck BullsEye ZeroZero Fit|Y
01|119060|2|3|Special Order. Unit Price Each. MOQ:4|Y
01|119060|3|1|C4-SZF16S-55-A|Y
01|119060|3|2|C4 Shank SK16 Slim Chuck BullsEye ZeroZero Fit|Y
01|119060|3|3|Special Order. Unit Price Each. MOQ:10|Y
01|119060|4|1|C4-SZF16S-55-A|Y
01|119060|4|2|C4 Shank SK16 Slim Chuck BullsEye ZeroZero Fit|Y
01|119060|4|3|Special Order. Unit Price Each. MOQ:20|Y
01|119060|5|1|C4-SZF16S-55-A|Y
01|119060|5|2|C4 Shank SK16 Slim Chuck BullsEye ZeroZero Fit|Y
01|119060|5|3|Special Order. Unit Price Each. MOQ:50|Y
01|119066|1|1|Reference RGA# TOR-53467|Y
01|119066|1|2|2x HSK100A-C42EX-135-IDU Sent in for evaluation.|Y
01|119067|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|119077|1|1|7 pcs available immediate. 5 pcs mid march|Y
01|119077|2|1|4pc availablw immediate. 4 additional mid march.|Y
01|119077|2|2|balance beginning of MAY. WE CAN USE THE 3 SPINDLE|Y
01|119077|2|3|WHICH WE HAVE 4 PCS TILL BALANCE ARRIVE|Y
01|119077|14|1|4TH INREFACE INCLUDES SERVO AMPCONNECTORS MACHINE|Y
01|119077|14|2|CABLES FIBRE OPTICS TRAVEL LABOR TRAINING|Y
01|119077|14|3|QUOTE BASED UPON 4 installs|Y
01|119115|12|1|HAS COUNTERBORE FOR CHIP INSTALLATION|Y
01|119115|21|1|ALREADY HAS CHIP INSTALLED|Y
01|119115|47|1|Quoted as NET pricing|Y
01|119116|1|1|CAT40-SK10-180UP-IDU|Y
01|119116|1|2|SKN-10K(GH) for hi speed|Y
01|119134|1|1|TAT-105(support table) 105mm face plate|Y
01|119134|1|2|RJ6+1 included|Y
01|119134|1|3|Power cable & Feeback cable included|Y
01|119134|1|4|Special items no cancelation no refund upon PO|Y
01|119134|1|5|Shipping is based on boat (ocean) from Japan|Y
01|119134|1|6|US domestic truck freight will be added on delivery|Y
01|119134|2|1|VQZ2151-5YZ1-M5-X524-S2F (Air Solenoid Valve)|Y
01|119134|2|2|shipping is based on boat(ocean) from Japan|Y
01|119134|2|3|special items|Y
01|119134|2|4|no cancelation no refund upon PO|Y
01|119144|1|1|TC#20880-2315-051919|Y
01|119148|1|1|Tooling Certificate Number: 13687-2364-062719|Y
01|119152|8|1|Lyndex-Nikken to make custom position block.|Y
01|119152|8|2|*Delivery is from receipt of spindle drawing specs|Y
01|119152|8|3|**Quoted at Net price|Y
01|119152|16|1|Lyndex-Nikken to make custom position block.|Y
01|119152|16|2|*Delivery is from receipt of spindle drawing specs|Y
01|119152|16|3|*Quoted at Net price|Y
01|119171|1|1|Reference RGA# TAR-53709|Y
01|119171|1|2|5AX-130ZA s/n: 3149 Tilt backlash is bad.|Y
01|119174|1|1|HSK63A 25.4mm Face / Shell Mill Holder|Y
01|119174|1|2|HSK63A-FMH25.4-70-60|Y
01|119174|1|3|Quoted as NET pricingnonreturnablenon-cancelable|Y
01|119184|1|1|Replacement for RGA#CUR53796 & CUR53779|Y
01|119184|1|2|Discount reflects purchase of one speeder to waive|Y
01|119184|1|3|inspection fees for above RGA's.|Y
01|119204|9|1|ETA pending|Y
01|119214|5|1|*Include quick disconnect swivel fittings and manifold|Y
01|119214|6|1|Hydraulic Lines Manifold Block Fittings|Y
01|119214|6|2|Net Charge of $500|Y
01|119214|7|1|External Power/Feedback Cables for 4th/5th Axis|Y
01|119214|9|1|TOOL CERT GIVEN TO MMS AT NO COST|Y
01|119216|5|1|*Include quick disconnect swivel fittings and manifold|Y
01|119216|6|1|Hydraulic Lines Manifold Block Fittings|Y
01|119216|6|2|Net Charge of $500|Y
01|119220|1|1|H63A(80)-SF0375-3.125ID|Y
01|119220|1|2|HSK63A 80mm Flange 3/8 Shrink Fit Holder;ID Chip Hole|Y
01|119220|1|3|UNV#406|Y
01|119221|1|1|Price includes coolant ports|Y
01|119234|1|1|TAT-105 (support table) 105mm face plate|Y
01|119234|1|2|6+1 PRJ included|Y
01|119234|1|3|Special items no cancelation no refund upon PO|Y
01|119234|1|4|Shipping is based on boat (ocean) from Japan|Y
01|119234|1|5|US domestic truck freight will be added on delivery|Y
01|119234|2|1|Special item no cancelation no refund uopn PO|Y
01|119234|2|2|Shipping is based on boat (ocean) from Japan|Y
01|119234|3|3|Special items no cancelation no refund upon PO|Y
01|119234|3|4|Shipping is based on boat (ocean) from Japan|Y
01|119234|4|1|Special itemno cancelation no refund upon PO|Y
01|119234|4|2|Shipping is based on boat (ocean) from Japan|Y
01|119234|4|3|TCE-97634 power cable (external)|Y
01|119234|5|1|Special item no cancelation no refund uopn PO|Y
01|119234|5|2|Shipping is based on boat (ocean) from Japan|Y
01|119234|5|3|TCE-97635 Feedback cable (external)|Y
01|119234|6|1|Special item no cancelation no refund upon PO|Y
01|119234|6|2|Shipping is based on boat (ocean) from Japan|Y
01|119234|6|3|VQZ2151-5YZ1-M5-X524-S2F (Air Solenoid Valve)|Y
01|119242|1|1|Reference RGA# TOR-53771|Y
01|119242|1|2|CAT40-NPU13-105U Tool body is damaged.|Y
01|119242|6|1|Replacement of CAT40-NPU13-105U.|Y
01|119242|6|2|We use this part# since CAT40-NPU13-105U is a|Y
01|119242|6|3|non-active part#.|Y
01|119244|4|1|Installation includes: Drive unit short bar fiber|Y
01|119244|4|2|optic cable communications cable bulkhead cables|Y
01|119244|4|3|external cables parameter changes service time and|Y
01|119244|4|4|travel.|Y
01|119246|1|1|180MM indexer with Nikken Alpha 21 controller with|Y
01|119246|1|2|cables pendant for programming M-code cable power|Y
01|119246|1|3|cable and external cables.|Y
01|119246|3|1|Installation includes: Drive unit short bar fiber|Y
01|119246|3|2|optic cable communications cable bulkhead cables|Y
01|119246|3|3|external cables parameter changes service time and|Y
01|119246|3|4|travel.|Y
01|119271|1|1|Mori Live X-axis U-Shape ER32 Special|Y
01|119271|1|2|BMT110; ER32; L=725mm; L1=614mm;|Y
01|119271|1|3|1:1 Gear; max 6000RPM;|Y
01|119271|1|4|Internal coolant 1015PSI;|Y
01|119271|1|5|ref drwg # 00040189|Y
01|119283|6|1|Price is for a one time purchase order of 15 holders.|Y
01|119294|1|1|2 IN STOCK AT 5 WEEK DELIVERY|Y
01|119294|1|2|1 SHIPPED IN FROM JAPAN 16 WEEKS|Y
01|119294|6|1|100MM RISER FOR TAIL STOCK TO BRING CENTERLINE TO|Y
01|119294|6|2|380MM TO MATCH THE CNCB630|Y
01|119294|7|1|25 CHUCK 13 THROUGH HOLE|Y
01|119294|7|2|CHUCK INCLUDES ADAPTER PLATE AND REQUIRED HARDWARE|Y
01|119294|7|3|FOR MOUNTING|Y
01|119296|4|1|** Closeout Promotion! All sales are FINAL!**|Y
01|119300|1|1|#5 Draw Screw|Y
01|119300|2|1|#8 Spring|Y
01|119300|3|1|#9 Steel Ball|Y
01|119301|9|1|Our new standard will come with pluggable coolant ports|Y
01|119301|10|1|Our new standard will come with pluggable coolant ports|Y
01|119305|2|1|ETA 09/04/2019|Y
01|119317|1|1|Reference RGA# TAR-53898|Y
01|119317|1|2|5AX-130ZA s/n: 1764 Tilt side making a grinding noise.|Y
01|119319|1|1|Brother S1000|Y
01|119326|13|1|Please note: Net price reflects one knob purchased|Y
01|119326|13|2|with a matching taper holder.|Y
01|119329|40|1|Please Note: C40S-4500(H)-EU can be purchased for $5.00|Y
01|119329|40|2|each with the purchase of the matching taper holder.|Y
01|119341|1|1|To be installed with PS-N46E at the factory|Y
01|119341|2|1|To be installed on NC5-46-FMA25.4-45|Y
01|119343|2|1|Power Cable|Y
01|119343|3|1|Feedback Cable|Y
01|119345|1|1|Replacement for # HH960C115HE M478 R-Cylinder|Y
01|119345|1|2|Quoted as NET pricing|Y
01|119345|1|3|ETA 25-26 WKS after order placed|Y
01|119349|1|1|VMK12-.308 Collet|Y
01|119362|6|1|Please Note: The retention knob can be taken at $5.00|Y
01|119362|6|2|net each with the purchase of a matching taper holder.|Y
01|119364|1|1|MZL60-ER32(X)-SP-HS|Y
01|119364|1|2|Mori Live X-axis U-Shape ER32 Special;|Y
01|119364|1|3|BMT110; ER32; L=725mm; L1=614mm;|Y
01|119364|1|4|1:2 Gear; max input 3500|Y
01|119364|1|5|max output 7000RPM;|Y
01|119364|1|6|max 20Nm torque|Y
01|119364|1|7|Internal coolant 1015PSI;|Y
01|119364|1|8|ref drwg # 00040189|Y
01|119366|1|1|Installed with PS-123E at the factory|Y
01|119366|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|119366|2|1|Installed on S-NC5-46-FMA31.75CS-45-M at the factory|Y
01|119393|1|1|Mori Live X-axis U-Shape ER32 Special|Y
01|119393|1|2|BMT110; ER32; L=725mm; L1=614mm;|Y
01|119393|1|3|1:1 Gear; max 6000RPM;|Y
01|119393|1|4|Internal coolant 1015PSI;|Y
01|119393|1|5|ref drwg # 00040189|Y
01|119394|3|1|CABLE SET FOR EITHER TABLE|Y
01|119395|1|1|MZL60-ER32(X)-SP-HS|Y
01|119395|1|2|Mori Live X-axis U-Shape ER32 Special;|Y
01|119395|1|3|BMT110; ER32; L=725mm; L1=614mm;|Y
01|119395|1|4|1:2 Gear; max input 3500|Y
01|119395|1|5|max output 7000RPM;|Y
01|119395|1|6|max 20Nm torque|Y
01|119395|1|7|Internal coolant 1015PSI;|Y
01|119395|1|8|ref drwg # 00040189|Y
01|119403|1|1|H63A(80)-SF0375-3.125ID|Y
01|119403|1|2|HSK63A 80mm Flange 3/8 Shrink Fit Holder;ID Chip Hole|Y
01|119403|1|3|UNV#406|Y
01|119430|5|1|UNV#5064|Y
01|119443|1|1|OPERATE VIA M FUNCTION THROUGH INDEPENDENT CONTROLLER|Y
01|119443|1|2|FOR INFINITE POSITIONING ONLY|Y
01|119445|5|1|UNV#5070|Y
01|119445|7|1|UNV#5121  - Repeat no approval drawing is needed|Y
01|119445|10|1|UNV#5020|Y
01|119449|1|1|TC# 12395-2366-070219PR|Y
01|119465|1|1|Quoted as NET pricing|Y
01|119465|1|2|ETA 21-22 WKS after order placed|Y
01|119485|4|1|UNV#5070|Y
01|119485|7|1|UNV#5121  - Repeat no approval drawing is needed|Y
01|119485|10|1|UNV#5020|Y
01|119494|1|1|Parts# F110-TB50S-555|Y
01|119494|1|2|Special Test Bar for Mazak.|Y
01|119506|1|1|C4-SK16-70|Y
01|119506|1|2|Quoted as net pricing|Y
01|119535|1|1|Conversion for OSP3 spec to FA-M spec includes:|Y
01|119535|1|2|motor wire harness motor cover motor gear testing|Y
01|119535|1|3|labor|Y
01|119535|2|1|Includes: amplifier external cables internal cables|Y
01|119535|2|2|communciations cable fiber optic cable short bar|Y
01|119535|2|3|travel labor expenses|Y
01|119539|1|1|~8ft|Y
01|119541|9|1|Works with SK20|Y
01|119548|3|1|1pc pending|Y
01|119548|6|1|1pc pending|Y
01|119549|7|1|Wrench price reflexes package with previous order|Y
01|119552|2|1|Warranty replacement for defective unit originally|Y
01|119552|2|2|shipped out on Inv# 2220430.|Y
01|119552|2|3|Ok to scrap defective unit in house.|Y
01|119555|12|1|This part to be replaced by NC4011-1000-4.00CP once|Y
01|119555|12|2|this stock is gone.New holder both non and coolant|Y
01|119555|12|3|capable|Y
01|119555|13|1|New part moving forward is both non and CP capable|Y
01|119568|1|1|Installed w/PS-N46E at the factory|Y
01|119568|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|119568|2|1|installed w/NC5-46-C20-80 at the factory|Y
01|119568|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|119570|1|1|Used tooling is non-returnable|Y
01|119585|2|1|*wrench for above SK16 collet chuck extension|Y
01|119585|5|1|*wrench for above Drill Chuck extension|Y
01|119592|1|1|Installed with PS-123-AIR at factory|Y
01|119594|1|1|Reference RGA# CUR-53983|Y
01|119594|1|2|Repair of WK-ZWS3-BT50-NUC12-O s/n: 20739 03|Y
01|119594|1|3|Mimatic# 172069|Y
01|119594|2|1|Bearings seals o-rings and spindle to be replaced.|Y
01|119594|4|1|Repair of WK-ZWS3-BT50-NUC12-O s/n: 64036 01|Y
01|119594|4|2|Mimatic# 172069|Y
01|119594|5|1|Bearings seals o-rings damaged housing spindle and|Y
01|119594|5|2|threadring to be replaced.|Y
01|119594|7|1|Repair of WK-ZWS3-BT50-NUC12-O s/n: 20739 02|Y
01|119594|7|2|Mimatic# 172069|Y
01|119594|8|1|Bearings seals o-rings and spindle to be replaced.|Y
01|119597|9|1|End Mill holder + Weldon shank tap holder extension|Y
01|119597|9|2|offered as an in stock alt to C40R5-0562-2.87(C)|Y
01|119599|1|1|Mimatic #140066; CAT50 RAH; ER11;L1=205;|Y
01|119599|1|2|1:1 Gear ratio; Max 12Nm torque; 11000 RPM|Y
01|119599|1|3|Reversal of rotation;No Coolant;|Y
01|119599|1|4|ref drwg # 00045290 but CAT50|Y
01|119599|3|1|Mimatic #140066; CAT50 RAH; ER11;L1=205;|Y
01|119599|3|2|1:1 Gear ratio; Max 12Nm torque; 11000 RPM|Y
01|119599|3|3|Reversal of rotation;No Coolant;|Y
01|119599|3|4|ref drwg # 00045290 but CAT50|Y
01|119629|1|1|Reference RGA# CUR-53724|Y
01|119629|1|2|CAT50U-NX5-151 s/n: azi-004 Needs new bearings.|Y
01|119645|10|1|No Torque Wrench Adapter for MMC Holders|Y
01|119645|25|1|SKJ6-1/16|Y
01|119645|26|1|SKJ6-3/32|Y
01|119645|68|1|207 Pull Studs; 1 Per Holder|Y
01|119645|88|1|Coolant-Thru Backup Screws for 1 Milling Chucks|Y
01|119651|15|1|TO ADD JET SLOTS|Y
01|119651|17|1|WILL ADD JET SLOTS|Y
01|119651|19|1|WILL ADD JET SLOTS|Y
01|119651|21|1|WILL ADD COOLANT PORTS|Y
01|119654|1|1|The table will be CNCZ100-2W-120LSABR2 with lefthand|Y
01|119654|1|2|motor.|Y
01|119677|4|1|Installation includes: Drive unit short bar fiber|Y
01|119677|4|2|optic cable communications cable bulkhead cables|Y
01|119677|4|3|external cables parameter changes service time and|Y
01|119677|4|4|travel.|Y
01|119678|1|1|Returning CAT40U-NX5-153 s/n: Mbzb-048|Y
01|119678|1|2|We could not duplicate issue when test running.|Y
01|119678|1|3|We added more grease as a precaution.  Please test run|Y
01|119678|1|4|and advise if this is running better for you.|Y
01|119695|1|1|REQUESTING AN MT-230 TAILSTOCK WITH A MORSE TAPER 4|Y
01|119695|1|2|SPINDLE.  THIS WILL COME FROM OUR MANUFACTURE|Y
01|119695|1|3|AND REQUIRES 10 WEEKS FOR MANUFACTURING|Y
01|119698|2|1|Warranty replacement for defective collets originally|Y
01|119698|2|2|shipped on Inv# 2226333|Y
01|119706|1|1|230mm Center Height will require Riser for 21 fixture|Y
01|119706|2|1|230mm Center Height will require Riser for 21 fixture|Y
01|119706|4|2|Includes Installation Drive Unit Bulkhead Cables|Y
01|119706|4|3|External Cables Service Time & Travel.|Y
01|119718|2|1|*wrench for C4017-0020-4.00|Y
01|119718|4|1|*wrench for C4007-0032-3.13|Y
01|119718|10|1|*wrench for CAT40-C1.1/4SL-105U-IDU|Y
01|119718|12|1|*wrench for CAT40-C3/4-105U-IDU|Y
01|119718|30|1|*disc wrench for CKFN32 coolant caps|Y
01|119718|33|1|*disc wrench for CKFN20 coolant caps|Y
01|119718|34|1|stocked pull stud: cross for Nikken PS-381E|Y
01|119722|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|119724|3|1|1/8 end mill 2-flute and 1/4 end mill 2-flute|Y
01|119724|4|1|3/8 end mill 2-flute|Y
01|119724|5|1|1/2 end mill 2-flute|Y
01|119724|6|1|M3 Tap Drill|Y
01|119724|7|1|Chamfer tools8-32 10-32 & 1/4-20 Tap Drills|Y
01|119724|8|1|5/16-18 tap drill|Y
01|119724|9|1|For M3 Tap not a Tap Collet|Y
01|119724|10|1|8-32 tap|Y
01|119724|11|1|10-32 tap|Y
01|119724|12|1|1/4-20 tap with Inch Shank|Y
01|119724|13|1|5/16-18 tap|Y
01|119734|3|1|New Standard will not come with pluggable coolant ports|Y
01|119734|4|1|New Standard will not come with pluggable coolant ports|Y
01|119738|1|1|CNC202LFA(8PRJ) mtach with S/N:30077TC|Y
01|119738|1|2|Rotary Table 200mm Left with 8 port rotary joint|Y
01|119738|1|3|Shipping from Japan will be via Boat (Ocean)|Y
01|119738|1|4|Current delivery subject to change|Y
01|119738|1|5|Special model no cancelation no refund upon PO|Y
01|119738|1|6|Showing NET PRICE|Y
01|119746|1|1|Cables march with CNC202LFA (8PRJ) S/N:30077TC|Y
01|119746|1|2|Shipping from Japan via Boat (Ocean)|Y
01|119746|1|3|Current delivery subject to change|Y
01|119746|1|4|Special no cancelation no refund upon PO|Y
01|119746|1|5|Showing NET PRICE|Y
01|119746|2|1|Cables march with CNC202LFA (8PRJ) S/N:30077TC|Y
01|119746|2|2|Shipping from Japan via Boat (Ocean)|Y
01|119746|2|3|Current delivery subject to change|Y
01|119746|2|4|Special no cancelation no refund upon PO|Y
01|119746|2|5|Showing NET PRICE|Y
01|119755|2|1|P/N: SKJ16-13.5C|Y
01|119757|2|4|NSVX-500LMA   with no motor|Y
01|119758|3|1|Custom Block to be manufactured by Lyndex-Nikken.|Y
01|119759|1|1|Air Brake Table AB|Y
01|119759|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|119759|7|1|INSTALLATION INCLUDES: SERVO MOTORS & DRIVES FOR|Y
01|119759|7|2|4TH/5TH AXES ON FEELER VMP MACHINING CENTER|Y
01|119759|7|3|BULKHEAD CONNECTORS LABOR FOR INSTALLATION &|Y
01|119759|7|4|TRAVEL/LODGING EXPENSES FOR LYNDEX NIKKEN|Y
01|119759|7|5|INSTALL TECHNICIAN|Y
01|119766|1|1|P/N: SKJ16-13.5C|Y
01|119766|1|2|SK13/SK16 Coolant Cap 13.5mm|Y
01|119768|14|1|NBT30-MDMS10S-80|Y
01|119768|14|2|2Lock TaperPlus NBT30 10mm Major Dream Shrink FitHolder|Y
01|119773|1|1|Note above item has a minimum qty of 5pc purchase|Y
01|119795|2|1|1 set of Cables|Y
01|119795|3|1|INSTALLAITON INCLUDES INTERNAL CABLE BULKHEAD|Y
01|119795|3|2|CONNECTORS FIBRE OPTIC CABLES ADDITIONAL DRIVES|Y
01|119795|3|3|SERVO MOTORS AND WIRE HARNESS LABOR TRAVEL TRAINING.|Y
01|119822|2|1|*wrench for C4007-0025-2.50|Y
01|119822|5|1|*to cover the 6mm (.236)|Y
01|119829|1|1|CNC202LFA(6+1RJ)mtach with S/N:30190TC|Y
01|119829|1|2|Rotary Table 200mm Left w/ 6+1 rotary joint|Y
01|119829|1|3|Shipping from Japan will be via Boat (Ocean)|Y
01|119829|1|4|Current delivery subject to change|Y
01|119829|1|5|Special model no cancelation no refund upon PO|Y
01|119829|1|6|Showing NET PRICE|Y
01|119840|15|1|Offered as an in stock option for line above.|Y
01|119840|17|1|Offered as an in stock option for line above.|Y
01|119840|22|1|In stock alt to line above to be held with 1 end mill|Y
01|119845|5|1|*Ext Coolant*|Y
01|119848|3|1|Cable Set|Y
01|119848|4|1|Installation includes: drive unit short bar fiber|Y
01|119848|4|2|optic cables communication cables bulk head cable|Y
01|119848|4|3|set external cable set parameter changes service|Y
01|119848|4|4|time and travel|Y
01|119851|2|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|119851|2|2|External Cables Service Time & Travel.|Y
01|119852|5|1|**External Coolant|Y
01|119852|7|1|**Internal Coolant|Y
01|119869|1|1|This holder is scheduled to arrive at our facility|Y
01|119869|1|2|today.|Y
01|119885|1|1|For NAKAMURA WY-250L Due 11/E|Y
01|119885|1|2|JPY130010($1=107.00) No Nut No Wrench|Y
01|119885|2|1|For NAKAMURA WT-100 Due 11/E|Y
01|119885|2|2|JPY188090($1=107.00) No Nut No Wrench|Y
01|119892|1|1|13485-2365-070219|Y
01|119893|1|1|13485-2365-070219|Y
01|119897|6|1|This item is not offered with Jet Slots|Y
01|119898|2|1|This item does not qualify for the Tool Cert|Y
01|119910|1|1|180mm Platters; 250mm Pitch Between Spindles|Y
01|119910|2|1|External Power/Feedback Cables for 4th Axis|Y
01|119914|2|1|Quoted as an in stock option to line 1|Y
01|119921|1|1|Reference RGA# TAR-54033|Y
01|119921|1|2|TAT-400 s/n:1155|Y
01|119933|2|1|P/N: SKJ16-13.5C|Y
01|119937|67|1|Nut for HS holder|Y
01|119957|2|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|119957|2|2|External Cables Service Time & Travel.|Y
01|119971|1|1|ANTI-RUST TREATMENT|Y
01|119975|1|1|Includes Haas Motor and Cable Set|Y
01|119984|1|1|Service Call 7/19/19|Y
01|119984|1|2|Replace Brake Components|Y
01|119984|1|3|5AX-130BAYA-BR S/N: NA - Brother #1 Pallet #2|Y
01|119984|2|1|Transit time 4.75 hrs x $100/hr = $475.00|Y
01|119984|2|2|Gas Per Milage: 130mi x $0.565 = $73.45|Y
01|119984|2|3|Meals: $30.00 x 1 Technician|Y
01|119991|1|1|**4pc MIN|Y
01|119996|1|1|Part # 4500-1265|Y
01|120008|5|1|Part Number TBD Mimatic #102771 Drwg # 00054916|Y
01|120008|5|2|But mounting interface for MP630|Y
01|120008|5|3|Continuously turnable 90deg|Y
01|120008|5|4|Delivery: 2~4 weeks for design 14~16 weeks mfg.|Y
01|120008|5|5|Please allow additional 2 weeks for shipping.|Y
01|120008|6|1|Part Number TBD Mimatic #102771 Drwg # 00054916|Y
01|120008|6|2|But mounting interface for MP630|Y
01|120008|6|3|Continuously turnable 90deg|Y
01|120008|6|4|Delivery: 2~4 weeks for design 14~16 weeks mfg.|Y
01|120008|6|5|Please allow additional 2 weeks for shipping.|Y
01|120008|7|1|Part Number TBD Mimatic #102771 Drwg # 00054916|Y
01|120008|7|2|But mounting interface for MP630|Y
01|120008|7|3|Continuously turnable 90deg|Y
01|120008|7|4|Delivery: 2~4 weeks for design 14~16 weeks mfg.|Y
01|120008|7|5|Please allow additional 2 weeks for shipping.|Y
01|120011|1|1|*repl for PO 1518997 in Taper Plus (Dual Contact)|Y
01|120014|1|1|Tooling Certificate Number:  E1094-2225-020619|Y
01|120019|16|1|*wrench for VC6 collet chuck|Y
01|120019|17|1|*wrench for VC13 collet chuck|Y
01|120019|18|1|*wrench for SK20 collet chuck|Y
01|120028|2|1|Cable Set for above 4th axis RT (up to 10ft)|Y
01|120029|2|1|Installation includes: Dual axis drive unit short bar|Y
01|120029|2|2|fiber optic cable communications cables bulkhead|Y
01|120029|2|3|cables external cables parameter changes service|Y
01|120029|2|4|time and travel.|Y
01|120038|1|1|Includes external cables|Y
01|120039|18|1|*wrench for VC6 collet chuck|Y
01|120039|19|1|*wrench for VC13 collet chuck|Y
01|120039|20|1|*wrench for SK20 collet chuck|Y
01|120042|1|1|2 IN STOCK AT 5 WEEK DELIVERY|Y
01|120042|1|2|1 SHIPPED IN FROM JAPAN 16 WEEKS|Y
01|120042|6|1|220.65MM RISER FOR TAIL STOCK TO BRING CENTERLINE TO|Y
01|120042|6|2|15.7 TO MATCH EXISTING APPLICATION|Y
01|120042|7|1|4.75 RISER FOR TABLE CENTER HEIGHT OF 15.7 TO|Y
01|120042|7|2|MATCH EXISTING APPLICATION.|Y
01|120046|6|1|PRICE IS NET TO DMG MORI|Y
01|120046|6|2|Installation includes: Drive unit short bar fiber|Y
01|120046|6|3|optic cable communications cable bulkhead cables|Y
01|120046|6|4|external cables parameter changes service time and|Y
01|120046|6|5|travel.|Y
01|120050|1|1|*Qty Break 1-4pcs|Y
01|120050|2|1|*Qty Break 5-10pcs|Y
01|120065|2|1|Includes drive unit internal external cables|Y
01|120065|2|2|fiber optic short bar communications cable|Y
01|120065|2|3|travel labor expenses|Y
01|120066|1|1|Replacement for Lyndex-Nikken RGA IPS-54152|Y
01|120081|4|1|FOR CNCZ-105|Y
01|120081|6|1|FOR CNCZ-105|Y
01|120081|8|1|FOR CNCZ-105|Y
01|120089|1|1|Quoted Bill @ $315 on this Discontinued item.|Y
01|120110|1|1|BF-120-17.8-34.90-23.80 Back Spot Facing Arbor|Y
01|120112|2|1|Offered as an in stock option to line 1|Y
01|120112|5|1|Offered as an in stock option to line 1|Y
01|120129|9|1|Our new standard will come with pluggable coolant ports|Y
01|120129|10|1|Our new standard will come with pluggable coolant ports|Y
01|120156|7|1|Balance Pending|Y
01|120156|19|1|4 stk balance 1-2 wks|Y
01|120156|20|1|8 stk - balance 1-2 weeks|Y
01|120177|1|1|Tool Certificate total amount to be determined|Y
01|120178|5|1|**ext coolant|Y
01|120188|1|1|CONFIRMATION OF MACHINE CONFIGURATION|Y
01|120188|1|2|BOB WILL BE VISITING THE WEEK OF 8/12|Y
01|120188|1|3|INSTALLATION TO BE DETERMINED|Y
01|120189|3|1|WILL BE PROVIDED WITH OSP4 MOTORS|Y
01|120192|1|1|Tooling non returnable after being run|Y
01|120200|2|1|Replacement Soft Jaws for R-10-SP-SET; Part S009|Y
01|120200|2|2|Delivery: 6 weeks by boat. If Hydro needs sooner we|Y
01|120200|2|3|can fly the part in we will need to re-quote price.|Y
01|120202|10|1|K32-SK13-120|Y
01|120202|10|2|32mm SK13 Slim Chuck Straight Shank Ext L:120mm|Y
01|120202|11|1|K32-SK13-150|Y
01|120202|11|2|32mm SK13 Slim Chuck Straight Shank Ext L:150mm|Y
01|120202|12|1|K32-SK13-180|Y
01|120202|12|2|32mm SK13 Slim Chuck Straight Shank Ext L:180mm|Y
01|120202|13|1|K32-SK13-210|Y
01|120202|13|2|32mm SK13 Slim Chuck Straight Shank Ext L:210mm|Y
01|120210|1|1|Reference RGA# TOR-54014|Y
01|120210|1|2|Repair of BT40-UMT200H|Y
01|120221|1|1|Delivery: 3-stock/43-2wks/Bal 14~15 Weeks|Y
01|120244|1|1|Tooling Certificate Number:  13435-1138-030818|Y
01|120244|1|2|Tooling Certificate Number:  13435-2383-080119|Y
01|120244|8|1|to use for 5/32|Y
01|120244|15|1|to hold 5/32|Y
01|120244|19|1|to hold 1/16|Y
01|120244|20|1|to hold 1/32|Y
01|120244|21|1|to hold 3/32|Y
01|120248|1|1|Pibo# X766-4003-10A Cross for CAT40-PX6-150GX|Y
01|120248|1|2|1-2 PC pricing|Y
01|120248|1|3|Non-returnable non-cancelable|Y
01|120248|1|4|Quoted as NET pricing|Y
01|120248|2|1|Pibo#076-05-206-10 generic stopper block per print|Y
01|120248|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|5|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|6|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|7|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|8|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|9|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|10|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|11|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|12|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|13|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|14|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|15|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120248|16|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120249|1|1|See eMAC Brochure/Literature|Y
01|120250|2|1|EXTERNAL POWER/FEEDBACK CABLES 4TH/5TH AXIS|Y
01|120250|3|1|INSTALLATION INCLUDES: DRIVES/MOTORS FOR 4TH/5TH|Y
01|120250|3|2|AXIS TABLE BULKHEAD CONNECTORS ELECTRICAL WIRING|Y
01|120250|3|3|PLUS TRAVEL/LODGING FOR LYNDEX NIKKEN INSTALLER.|Y
01|120260|1|1|Reference RGA# LVR-53773|Y
01|120260|1|2|Repair of MZQT47-ER32Z-MS-OFF-C s/n: 7655201|Y
01|120260|1|3|MIM# 167955|Y
01|120260|2|1|Housing bearings seals & o-rings must be replaced.|Y
01|120260|2|2|Price includes labor.|Y
01|120268|3|1|5 pcs. available in Rigid Style - C50R5-0562-2.87(C)|Y
01|120268|4|1|Available in a Rigid Style - C50R5-0875-3.50(C)|Y
01|120281|1|1|Reference RGA# LVR-54069|Y
01|120281|1|2|Repair of MZQT47-ER32X-OFF-C s/n: 30101 02|Y
01|120281|1|3|Mimatic# 124259|Y
01|120281|2|1|Bearings seals and o-rings to be replaced.|Y
01|120281|4|1|Repair of Mazak V-Type ER32 s/n: n/a|Y
01|120281|5|1|Bearings seals and o-rings to be replaced.|Y
01|120286|1|1|Approximately 8 week delivery|Y
01|120312|1|1|Only 1 table. Includes the interface and cables|Y
01|120312|1|2|Note: No Tooling Cert|Y
01|120328|8|1|MACHINE SPINDLE DRAWING REQUIRED TO MAKE BLOCK|Y
01|120331|5|1|*Updated part# (old part#C5031-1250-8.00)|Y
01|120331|5|2|**New feature: w/ coolant ports|Y
01|120338|1|1|We don't have internal coolant version / no back plate|Y
01|120338|1|2|NL3000-8432|Y
01|120338|2|1|We don't have internal coolant version / no back plate|Y
01|120338|2|2|NL3000-8435|Y
01|120338|3|1|NL3000-8311|Y
01|120338|4|1|NL3000-8411|Y
01|120348|1|1|New standard Shrink will come with pluggable coolant|Y
01|120348|1|2|ports|Y
01|120350|8|1|CABLE LENGTH TO CHANGE AND CONFIRM|Y
01|120350|9|1|CABLE LENGTH TO BE DETERMINED AND CONFIRMED|Y
01|120350|11|1|STANDARD AZIMUTH CERTIFICATE INCLUDED NO CHARGE|Y
01|120350|13|1|THIS MAY CHANGE. lYNDEX nIKKEN HAS NO EXPERIENCE|Y
01|120350|13|2|INCLUDES DUAL AXIS DRIBE INTERNAL CABLES FIBRE OPTICS|Y
01|120350|13|3|POSSIBLY JUNCTION BOX AND CONNECTORS|Y
01|120351|10|1|NET PRICE HAS BEEN QUOTED.|Y
01|120352|1|1|Please note this is new part # moving forward|Y
01|120366|2|1|BT50-Z24-187|Y
01|120393|1|1|This table to be configure with Fanuc Alpha 8 motor|Y
01|120396|1|1|Tooling Certificate Number: E1094-2225-020619|Y
01|120425|2|1|Replacement Soft Jaws for R-10-SP-SET; Part S009|Y
01|120425|2|2|Delivery: 6 weeks by boat. If Hydro needs sooner we|Y
01|120425|2|3|can fly the part in we will need to re-quote price.|Y
01|120425|2|4|Quoted at Net price.|Y
01|120425|9|1|Quoted at Net price.|Y
01|120426|12|1|HAS COUNTERBORE FOR CHIP INSTALLATION|Y
01|120426|21|1|ALREADY HAS CHIP INSTALLED|Y
01|120426|47|1|Quoted as NET pricing|Y
01|120432|6|1|P/N CNCZ302LMA-M High Speed Rotary Table 300mm Left|Y
01|120432|7|1|For CNC260 & CNC302|Y
01|120432|8|1|P/N CNC321LMA-M Rotary Table 320mm Left Meldas|Y
01|120432|11|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|120432|11|2|External Cables Service Time & Travel.|Y
01|120433|1|1|Non stock special is non cancelable/non returnable ARO|Y
01|120446|2|1|Positioning Block for Haas Machine|Y
01|120446|3|1|Custom Mazak Block|Y
01|120459|1|1|13687-1152-032318|Y
01|120461|11|1|MZQT47-ER32Z-OF-SUB-ICE Mazak Live Z-axis Hor 90deg|Y
01|120461|11|2|ER32 Offset Sub IntC 7MP <H-Type>|Y
01|120461|11|3|Quoted at NET price. Please note this tool is|Y
01|120461|11|4|non-standard stock once a purchase order is placed|Y
01|120461|11|5|it cannot be cancelled or returned.|Y
01|120462|3|1|Installation includes:Drive unit communications cable|Y
01|120462|3|2|short bar fiber optic cable bulkhead cables|Y
01|120462|3|3|external cables service time and travel.|Y
01|120464|4|1|takes place of old part# C40S-4500(H)|Y
01|120483|2|1|EXTERNAL POWER/FEEDBACK CABLES 4TH/5TH AXIS|Y
01|120487|2|1|***Non-Cancelable Non-Returnable***|Y
01|120498|2|1|*revised part#|Y
01|120506|1|1|Shrink Fit Package Consists of Shrink Fit Machine +|Y
01|120506|1|2|10 CAT40 Taper Shrink Fit Holders with Coolant Ports|Y
01|120527|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|120547|1|1|Reference RGA# TOR-54070|Y
01|120547|1|2|Repair of PF-2|Y
01|120547|2|1|Labor quote for calibration.|Y
01|120548|1|1|Installed with PS-N46E at the factory|Y
01|120548|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|120548|2|1|Installed on S-NC5-46-FMA31.75CS-45-M at the factory|Y
01|120553|1|1|Mimatic Part #195245 BMT65 LIVE TOOL; SK16; STRAIGHT;|Y
01|120553|1|2|Y-AXIS DUAL OUTPUT;|Y
01|120553|1|3|REF DRWG # 00056065 MOUNTING INTERFACE FOR HAAS ST25Y|Y
01|120553|1|4|Quoted at Net Price|Y
01|120553|3|1|Mimatic Part #195245 BMT65 LIVE TOOL; SK16; STRAIGHT;|Y
01|120553|3|2|Y-AXIS DUAL OUTPUT;|Y
01|120553|3|3|REF DRWG # 00056065 MOUNTING INTERFACE FOR HAAS ST25Y|Y
01|120553|3|4|Net Price Quoted|Y
01|120554|2|1|Includes 1 set of cables.|Y
01|120554|3|1|ROTARY TABLE INSTALLATION INCLUDES:|Y
01|120554|3|2|4TH AXIS SERVO AMPLIFIER MOTOR WIRING FROM|Y
01|120554|3|3|ELECTRICAL CABINET TO BULKHEAD BULKHEAD CONNECTORS|Y
01|120554|3|4|AND TRAVEL EXPENSES FOR LYNDEX NIKKEN'S INSTALLER.|Y
01|120562|1|1|Reference RGA# LVR-54125|Y
01|120562|1|2|MNL12-ER32Z-MS s/n: A0189 T32216|Y
01|120562|2|1|Spindle shaft collet nut bearings seals o-rings|Y
01|120562|2|2|and some small parts must be replaced.|Y
01|120562|2|3|Labor is included.|Y
01|120596|1|1|Net price quoted based up a purchase order of 20+.|Y
01|120596|1|2|Current delivery 24-pcs 1~2 wks/Balance 14 Weeks|Y
01|120605|1|1|Reference RGA# TAR-54164|Y
01|120605|1|2|CNCZ180LYA-BR s/n: NA|Y
01|120605|28|1|Quoted as a core trade in for unrepairable TAT-105|Y
01|120605|28|2|sent in on RGA# TAR-54164|Y
01|120617|1|1|R8 Taper AH; 8mm side lock output; L=127mm;|Y
01|120617|1|2|External Coolant; 1:1 67 Gear; max torque 6Nm;|Y
01|120617|1|3|Max RPM input 4400 RPM; Max RPM output 9000 RPM|Y
01|120617|1|4|Ref drwg#00056041|Y
01|120626|1|1|3758-2386-080719|Y
01|120641|1|1|cross from CAT50-Z12-130U|Y
01|120641|2|1|*this is the only way it comes. std stock item in US|Y
01|120641|4|1|cross from ZKG12-12|Y
01|120641|5|1|cross from ZKG12-8|Y
01|120646|16|1|New standard shell mill's will include coolant ports|Y
01|120655|1|1|Howa is closed 8/12~8/16 Stock at Howa|Y
01|120658|1|1|82046  HSK63A-BB2.50-13.00|Y
01|120660|1|1|SIMILAR TO CNC401FA-M BUT FOR HAAS EC-1600ZT|Y
01|120660|1|2|WITH NEW GENERATION CONTROL|Y
01|120660|4|1|Cable set|Y
01|120664|3|1|Installation includes: drive unit short bar fiber|Y
01|120664|3|2|optic cables communication cables bulk head cable|Y
01|120664|3|3|set external cable set parameter changes service|Y
01|120664|3|4|time and travel.|Y
01|120694|2|1|External power/feedback cables for 4th and 5th axis|Y
01|120694|5|1|Quoted as NET pricing|Y
01|120695|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|120695|4|2|External Cables Service Time & Travel.|Y
01|120704|2|1|installation includes mounting table to machine and|Y
01|120704|2|2|perameter changes|Y
01|120718|16|1|Labor $135 x 8 hours x 2 days(Engineer from Lyndex USA)|Y
01|120718|17|1|Transit Time:$100 x 10 hrs x 2 days (Engineer from|Y
01|120718|17|2|Lydex USA)|Y
01|120718|17|3|Flight: Chicago to Mexico(Engineer from Lyndex USA)|Y
01|120718|17|4|Hotel: $100/nights x 3 nights(Engineer from Lyndex USA)|Y
01|120718|17|5|Meal: $40/day x 4 days (Engineer frmo Lyndex)|Y
01|120718|18|1|Labor $135 x 8 hrs x 2days(Engineer from Lyndex Mexico)|Y
01|120718|19|1|Transit time: $100 x 2 hrs x 2 days (Engineer from|Y
01|120718|19|2|Lyndex)|Y
01|120718|19|3|Meal: $40/day x 4 days|Y
01|120719|1|1|Need to confirm motor and encoder model|Y
01|120726|6|1|Required for 250 size and above optional for 130 & 201|Y
01|120726|7|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|120726|7|2|External Cables Service Time & Travel.|Y
01|120756|1|1|Reference RGA# TOR-54050|Y
01|120756|1|2|Repair of SF-START2-UNIT-380 s/n: 2M291|Y
01|120756|1|3|Unit just quit working. Checked the old unit whith the|Y
01|120756|1|4|new motherboard but still did not work.|Y
01|120761|1|1|HSK50A-FMA25.4-55|Y
01|120761|1|2|No quote|Y
01|120761|6|1|HSK50A-C16-105|Y
01|120761|6|2|No Quote|Y
01|120761|7|1|HSK50A-C20-110|Y
01|120761|7|2|No Quote|Y
01|120768|5|1|**Take SK16 collets|Y
01|120787|5|1|3-pcs stock/10-pcs 09/16/Bal 13~14 Weeks|Y
01|120787|13|1|Sub for NB3007-0025-2.00|Y
01|120796|1|1|Tooling Certificate Number:  13435-2380-080519|Y
01|120796|17|1|use with NCAT40-SK16C-60U when using coolant disc|Y
01|120808|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR NIKKEN 4TH AXIS|Y
01|120811|41|1|*must use with System #2 holder|Y
01|120811|42|1|*must use with System #2 holder|Y
01|120814|2|1|MA power/feedback cables|Y
01|120849|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|120850|2|1|New shrink fit will come with pluggable coolant ports|Y
01|120850|4|1|New shrink fit will come with pluggable coolant ports|Y
01|120850|9|1|New shrink fit will come with pluggable coolant ports|Y
01|120854|2|1|19.72 Faceplate|Y
01|120854|3|2|23.66 Faceplate|Y
01|120854|4|1|31.61 Faceplate|Y
01|120854|14|1|INCLUDES: TRAVEL/LODGING FOR LN SERVICE TECH; SERVO|Y
01|120854|14|2|MOTORS; BULKHEAD CONNECTORS; ELECTRICAL CABINET|Y
01|120854|14|3|WIRING.|Y
01|120857|1|1|Quote is based on standard pitch (60mm).|Y
01|120857|2|1|Quote is based on standard pitch (60mm).|Y
01|120857|3|1|Quote is based on standard pitch (60mm).|Y
01|120861|18|1|** Closeout Promotion! All sales are FINAL!**|Y
01|120867|1|1|Special Extended 90 head; Horizontal boring machine;|Y
01|120867|1|2|CAT50; MI50; Snap adj 90deg;L=1110mm; L=830mm;|Y
01|120867|1|3|1:1 Gear; max 25Nm torque; 6500RPM;|Y
01|120867|1|4|Ref drwg # 00046271 but CAT50 TAPER|Y
01|120867|1|5|Lyndex-Nikken Part Number TBD|Y
01|120867|3|1|Special Extended 90 head; Horizontal boring machine;|Y
01|120867|3|2|CAT50; MI50; Snap adj 90deg;L=1110mm; L=830mm;|Y
01|120867|3|3|1:1 Gear; max 25Nm torque; 6500RPM;|Y
01|120867|3|4|Ref drwg # 00046271 but CAT50 TAPER|Y
01|120867|3|5|Lyndex-Nikken Part Number TBD|Y
01|120867|5|1|Special Extended 90 head; Horizontal boring machine;|Y
01|120867|5|2|CAT50; MI50; Snap adj 90deg;L=1110mm; L=830mm;|Y
01|120867|5|3|1:1 Gear; max 25Nm torque; 6500RPM;|Y
01|120867|5|4|Ref drwg # 00046271 but CAT50 TAPER|Y
01|120867|5|5|Lyndex-Nikken Part Number TBD|Y
01|120869|10|1|Offered as an in stock option.|Y
01|120877|15|1|Offered as an in stock option for line above.|Y
01|120877|17|1|Offered as an in stock option for line above.|Y
01|120877|22|1|In stock alt to line above to be held with 1 end mill|Y
01|120878|1|1|Special Extended 90 head; Horizontal boring machine;|Y
01|120878|1|2|CAT50; MI50; Snap adj 90deg;L=1110mm; L=830mm;|Y
01|120878|1|3|1:1 Gear; max 25Nm torque; 6500RPM;|Y
01|120878|1|4|Ref drwg # 00046271 but CAT50 TAPER|Y
01|120878|1|5|Lyndex-Nikken Part Number TBD|Y
01|120878|3|1|Special Extended 90 head; Horizontal boring machine;|Y
01|120878|3|2|CAT50; MI50; Snap adj 90deg;L=1110mm; L=830mm;|Y
01|120878|3|3|1:1 Gear; max 25Nm torque; 6500RPM;|Y
01|120878|3|4|Ref drwg # 00046271 but CAT50 TAPER|Y
01|120878|3|5|Lyndex-Nikken Part Number TBD|Y
01|120878|5|1|Special Extended 90 head; Horizontal boring machine;|Y
01|120878|5|2|CAT50; MI50; Snap adj 90deg;L=1110mm; L=830mm;|Y
01|120878|5|3|1:1 Gear; max 25Nm torque; 6500RPM;|Y
01|120878|5|4|Ref drwg # 00046271 but CAT50 TAPER|Y
01|120878|5|5|Lyndex-Nikken Part Number TBD|Y
01|120879|1|1|Reference RGA# TOR-54115|Y
01|120879|1|2|Repair of PF-2|Y
01|120903|1|1|ETA aprox 4-5 months|Y
01|120903|1|2|This table is priced in terms of NET pricing.|Y
01|120904|1|1|STOCK: Customer is currently using the loaner tools.|Y
01|120909|1|1|Mimatic Part #185241; CAT40; Multi Spindles (x4); ER16;|Y
01|120909|1|2|100x48 mm pitch output; L1=220mm;|Y
01|120909|1|3|1:1.7 Gear max 10Nm torque;max input 5900RPM;|Y
01|120909|1|4|max output 10000RPM;Int/ Ext coolant 1015 PSI;|Y
01|120909|1|5|Ref drwg# 00056063 but CAT40|Y
01|120909|3|1|Mimatic Part #195241;CAT40; Multi Spindles (x4); ER16;|Y
01|120909|3|2|100x48 mm pitch output; L1=220mm;|Y
01|120909|3|3|1:1.7 Gear max 10Nm torque;max input 5900RPM|Y
01|120909|3|4|max output 10000RPM;Int/ Ext coolant 1015 PSI;|Y
01|120909|3|5|Ref drwg# 00056063 but CAT40|Y
01|120909|5|1|Mimatic Part #195241;CAT40; Multi Spindles (x4); ER16;|Y
01|120909|5|2|100x48 mm pitch output; L1=220mm;|Y
01|120909|5|3|1:1.7 Gear max 10Nm torque;max input 5900RPM|Y
01|120909|5|4|max output 10000RPM;Int/ Ext coolant 1015 PSI;|Y
01|120909|5|5|Ref drwg# 00056063 but CAT40|Y
01|120909|7|1|Mimatic Part#195241; CAT40; Multi Spindles (x4); ER16;|Y
01|120909|7|2|100x48 mm pitch output; L1=220mm;|Y
01|120909|7|3|1:1.7 Gear max 10Nm torque;max input 5900RPM|Y
01|120909|7|4|max output 10000RPM; Int/ Ext coolant 1015 PSI;|Y
01|120909|7|5|Ref drwg# 00056063 but CAT40|Y
01|120909|9|1|Mimatic Part #195241;CAT40; Multi Spindles (x4); ER16;|Y
01|120909|9|2|100x48 mm pitch output; L1=220mm;|Y
01|120909|9|3|1:1.7 Gear max 10Nm torque;max input 5900RPM|Y
01|120909|9|4|max output 10000RPM;Int/ Ext coolant 1015 PSI;|Y
01|120909|9|5|Ref drwg# 00056063 but CAT40|Y
01|120915|17|1|Specials offered are non-cancelable & non returnable|Y
01|120915|17|2|after receipt of PO.|Y
01|120915|26|1|Specials offered are non cancelable & non returnable|Y
01|120915|26|2|after receipt of a PO.|Y
01|120915|31|1|Specials offered are non-cancelable & non-returnable|Y
01|120915|31|2|after receipt of a PO.|Y
01|120917|2|1|Installation includes: Drive unit  short bar fiber|Y
01|120917|2|2|optic cable communications cable bulkhead cables|Y
01|120917|2|3|external cables parameter changes servie time and|Y
01|120917|2|4|travel.|Y
01|120918|2|1|Fanuc Scale + Scale Mount Kit + Wiring + Cover|Y
01|120918|3|1|Rotary Union - ** Special 2 Port GE Spec**|Y
01|120918|11|1|Rotary Cover|Y
01|120918|12|1|Tilt Cover|Y
01|120918|23|1|Labor for converting from Fanuc to Mitsubishi or|Y
01|120918|23|2|Seimens|Y
01|120926|1|1|Includes: Haas motor and cable set.|Y
01|120929|2|1|This item does not qualify for the Tool Cert|Y
01|120933|3|1|Includes Drive Unit Fiber Optic Cables Communication|Y
01|120933|3|2|cables bulkhead cables external cables parameter|Y
01|120933|3|3|changes service & Time|Y
01|120950|4|1|1 adapter sleeve for above boring holder|Y
01|120950|5|1|10mm adapter sleeve for above boring holder|Y
01|120950|6|1|12mm adapter sleeve for above boring holder|Y
01|120950|7|1|20mm adapter sleeve for above boring holder|Y
01|120950|8|1|25mm adapter sleeve for above boring holder|Y
01|120950|9|1|32mm adapter sleeve for above boring holder|Y
01|120962|3|1|SWING BOX CABLE MANAGEMENT SUSPENSION ROUTING|Y
01|120962|3|2|POWER AND FEEDBACK CABLE SET.|Y
01|120962|4|1|Installation includes: Drive unit short bar fiber|Y
01|120962|4|2|optic cable communications cable bulkhead cables|Y
01|120962|4|3|external cables parameter changes service time and|Y
01|120962|4|4|travel.|Y
01|120962|4|5|COST IS NET TO ELLISON|Y
01|120964|1|1|Alternative available P/N: C5007-1000B|Y
01|120966|3|1|POWER AND FEED BACK CABLE SET|Y
01|120966|4|1|Installation includes: Drive unit short bar fiber|Y
01|120966|4|2|optic cable communications cable bulkhead cables|Y
01|120966|4|3|external cables parameter changes service time and|Y
01|120966|4|4|travel.|Y
01|120966|4|5|COST IS NET TO ELLISON|Y
01|120967|3|1|POWER AND FEED BACK CABLES|Y
01|120967|4|1|Installation includes: Drive unit short bar fiber|Y
01|120967|4|2|optic cable communications cable bulkhead cables|Y
01|120967|4|3|external cables parameter changes service time and|Y
01|120967|4|4|travel.|Y
01|120967|4|5|COST IS NET TO ELLISON|Y
01|120977|2|1|1 complete set of cables|Y
01|120977|3|1|Installation includes: drive unit short bar fiber|Y
01|120977|3|2|optic cables communication cables bulk head cable|Y
01|120977|3|3|set external cable set parameter changes service|Y
01|120977|3|4|time and travel.|Y
01|120978|1|1|Nut swap for the below holders|Y
01|120978|2|1|SKN-10BJ to be installed on this.|Y
01|120978|3|1|To be installed on CAT40-SK10-90U-IDU|Y
01|121006|3|1|S7/16-20x1/2 Set Screw|Y
01|121006|5|1|S1/2-20UNF X 5/8 Set Screw|Y
01|121016|5|1|**Internal Coolant|Y
01|121016|7|1|**Internal Coolant - faces Sub Spindle|Y
01|121035|1|1|NBT40-RAC25-180E|Y
01|121035|1|2|Quoted as NET pricingon-returnablenon-cancelable|Y
01|121035|2|1|12-RAC25-55E|Y
01|121035|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|121035|3|1|CC07-C4(AC630M)|Y
01|121035|3|2|(1) 10 pc set|Y
01|121035|3|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|121035|4|1|CC07-C8 (AC630M)|Y
01|121035|4|2|(1) 10 pc set|Y
01|121035|4|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|121049|2|1|Replacement Soft Jaws for R-10-SP-SET; Part S009|Y
01|121049|2|2|Quoted at Net price.|Y
01|121049|9|1|Quoted at Net price.|Y
01|121056|1|1|WITH ALPHA 4 MOTOR TO MATCH EXISTIN DRIVE|Y
01|121062|4|1|M16X 120L SHCS|Y
01|121063|1|1|Replacement for MZMP47-ER16-AD-HS per Tim Reeves.|Y
01|121063|5|1|Replacement for MZMP47-ER16-AD-HS per Tim Reeves.|Y
01|121076|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|121082|2|1|*** MT #3 socket ***|Y
01|121086|1|1|Lyndex-Nikken is not responsible for installation or|Y
01|121086|1|2|compatability to the machine tool.|Y
01|121088|1|1|Lyndex-Nikken is not responsible for installation or|Y
01|121088|1|2|compatability to the machine tool.|Y
01|121094|1|1|Service call completed by Gus Vazquez on CNCZ180|Y
01|121094|1|2|s/n: 20323T|Y
01|121094|12|1|Transit time: 4hrs x $100/hr = $400.00|Y
01|121094|12|2|Gas per Mileage: 129 mi x $0.565/mi = $72.89|Y
01|121095|5|1|Hoses and Fitting|Y
01|121107|1|1|Trade in Price|Y
01|121107|2|1|Standard price|Y
01|121121|1|1|1x set of 2x tables|Y
01|121121|1|2|No Tooling cert max 40% discount|Y
01|121121|3|1|1000PSI Max|Y
01|121147|2|1|Installation inlcudes: Dual axis drive fiber optic|Y
01|121147|2|2|cables communications cables bulkhead cables|Y
01|121147|2|3|external cables parameter changes service time and|Y
01|121147|2|4|travel.|Y
01|121165|2|1|1 piece in stock 1 piece 5 wks 1 piece 16 wks ARO|Y
01|121181|1|1|Reference RGA# TAR-54148|Y
01|121181|1|2|CNC260TSA s/n: 1068|N
01|121185|1|1|RGA: CUR-54076|Y
01|121185|1|2|C40-MRAM S/N: 82403 03|Y
01|121185|2|1|Bearings/Seals/O-Rings need to be replaced|Y
01|121185|2|2|Pricing includes all parts and labor to repair.|Y
01|121186|2|1|Offered as an in stock alternative to line 1|Y
01|121188|1|1|SIMILAR TO CNC401FA-M BUT FOR HAAS DT-1 with NGC|Y
01|121188|1|2|Control.|Y
01|121199|5|1|Delivery pending|Y
01|121205|1|1|Reference RGA# TOR-54039|Y
01|121205|1|2|CAT50-C1.1/4-105U-IDU Needs new bearings.|Y
01|121208|4|1|Installation includes: Dual axis drive unit short bar|Y
01|121208|4|2|fiber optic cablecommunications cable bulkhead cables|Y
01|121208|4|3|external cables parameter changes service time and|Y
01|121208|4|4|travel.|Y
01|121225|1|1|This block is quoted at NET Price|Y
01|121242|9|1|Works with SK20|Y
01|121254|7|1|P/N: B4016-0312-4.00DIN is available. Same price|Y
01|121261|1|1|** ( 2 pc MINIMUM ) **|Y
01|121261|2|1|** ( 5-10pcs ) **|Y
01|121261|5|1|** ( 2pc MINIMUM ) **|Y
01|121261|6|1|** ( 5-10 pcs ) **|Y
01|121268|2|1|Lyndex-Nikken to make position block based on spindle|Y
01|121268|2|2|drawing provided by customer.|Y
01|121268|2|3|*NET price to MSC|Y
01|121274|1|1|ER16 Crossover|Y
01|121274|2|1|ER20 Crossover|Y
01|121274|3|1|Crossover for ER32 and ER40|Y
01|121274|3|2|4pcs Stock Remainder ETA aprox 1-2 weeks|Y
01|121274|4|1|Crossover for ER32 and ER40|Y
01|121288|1|1|Tooling Certificate Number: e9901-2188-122718|Y
01|121303|1|1|Includes: Cable set|Y
01|121306|1|1|BT50-BSB62-270|Y
01|121319|10|1|No Torque Wrench Adapter for MMC Holders|Y
01|121319|15|1|Alternative option for NCAT|Y
01|121319|15|2|enough stock for balance|Y
01|121319|18|1|ALT to NCAT enough stock for balance|Y
01|121319|19|1|ALT to NCAT 18 PCS avail|Y
01|121319|30|1|SKJ6-1/16|Y
01|121319|31|1|SKJ6-3/32|Y
01|121319|73|1|207 Pull Studs; 1 Per Holder|Y
01|121319|74|1|Extra 140 Pull Studs Requested|Y
01|121319|93|1|Coolant-Thru Backup Screws for 1 Milling Chucks|Y
01|121329|17|1|HSK100A-ER25S-100|Y
01|121329|18|1|HSK100A-ER25S-160|Y
01|121329|19|1|HSK100A-ER32S-100|Y
01|121329|20|1|HSK100A-ER32S-160|Y
01|121331|1|1|CONFIRMATION OD PROPER OSP MOTORS/CONTROL|Y
01|121331|1|2|PROPER INTERFACE NEEDS TO BE UPDATED|Y
01|121334|1|1|Reference RGA# TAR-54126|Y
01|121334|1|2|CNC260TSA s/n: 1048|Y
01|121334|27|1|CN260T030 - Gasket/Seal|Y
01|121336|1|1|Lyndex-Nikken is not responsible for installation or|Y
01|121336|1|2|compatability to the machine tool.|Y
01|121340|1|1|Reference RGA# TAR-53852|Y
01|121340|1|2|5AX-2MT-105-120FA-M s/n: 8112|Y
01|121343|8|1|*Special pricing - Quantity of pull stud must match|Y
01|121343|8|2|quantity of CAT40 holders.|Y
01|121346|8|1|Cross from Seco 03119939/ PS-B30C-45-003|Y
01|121346|8|2|For Brother Speedio R650X2|Y
01|121346|8|3|*These coolant through pull studs have 2 o-rings and|Y
01|121346|8|4|material is made stronger then a std non-coolant.y|Y
01|121346|8|5|*Special pricing - Quantity of pull stud must match|Y
01|121346|8|6|quantity of BT30 holders.|Y
01|121350|1|1|BT50-FMH22.225-60-60|Y
01|121350|1|2|BT50 Face Mill Arbor|Y
01|121350|1|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|121350|2|1|BT50-FMH22.225-47-105|Y
01|121350|2|2|BT50 Face Mill Arbor|Y
01|121350|2|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|121356|1|1|Net price reflects replacement tool OKEX-ER32Z-MS.|Y
01|121356|1|2|Jon to send tool in for evaluation>>Running loud.|Y
01|121384|7|1|Optional: But highly recommended|Y
01|121386|1|1|Quoted as Net pricing|Y
01|121388|2|1|#5 Retainer for H0378M8 Chuck|Y
01|121401|2|1|Please Note: C40S6-1000-2.00 is priced as the|Y
01|121401|2|2|C40R5-0562-3.02 tap holder and W10R5-0562-1.46 is no|Y
01|121401|2|3|charge.|Y
01|121401|21|1|Retention Knob Promo: Buy a CAT40 taper holder and get|Y
01|121401|21|2|the matching taper knob for $5.00 net.|Y
01|121403|1|1|Non-returnablenon-cancelable|Y
01|121406|12|1|to hold .141 shank/ #6 shank tap|Y
01|121410|1|1|P/N: C50RAM-C5-258FM|Y
01|121410|1|2|CAT50; AGH; Capto 5; Flange Mount; 2.5:1 gear ratio|Y
01|121410|1|3|max 250 Nm; max input 4500 RPM; max output 1800 RPM;|Y
01|121410|1|4|ref. dwg # 00043204|Y
01|121432|1|1|Includes: 180MM table with motor and hard wired cable|Y
01|121432|1|2|set drive unit solenoid pressure switch for TC-R2B|Y
01|121432|1|3|Installation not included.|Y
01|121432|1|4|Tooling certificate does not apply.|Y
01|121433|5|1|PRICE IS NET TO KOCH|Y
01|121433|5|2|Installation includes: Drive unit short bar fiber|Y
01|121433|5|3|optic cable communications cable bulkhead cables|Y
01|121433|5|4|external cables parameter changes service time and|Y
01|121433|5|5|travel.|Y
01|121443|1|1|PS-A4 Retention Knob IT40: Quoted at NET price.|Y
01|121444|1|1|LT tool for Fuji TNW4500. ER32 IC Spindle Pitch 153.7mm|Y
01|121444|1|2|Special Order. Unit Price each|Y
01|121444|1|3|These items are considered specail and non-cancellable|Y
01|121450|2|1|13 pieces 2~3 Weeks/Bal 14 Weeks|Y
01|121454|4|1|M16X 120L SHCS|Y
01|121488|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|121488|4|2|Based on standard pitch (82mm)|Y
01|121488|5|1|CAT50U-SLO1-150|Y
01|121488|5|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|121488|5|3|Based on standard pitch (82mm)|Y
01|121488|6|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|121488|6|2|Based on standard pitch (82mm)|Y
01|121488|7|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|121488|7|2|Based on standard pitch (82mm)|Y
01|121500|1|1|Quote is based on STD pitch(60) and Net price quoted.|Y
01|121502|4|1|Includes Installation Drive Units Bulkhead Cables|Y
01|121502|4|2|External Cables Service Time & Travel.|Y
01|121540|1|1|Please note the actual gage length is 6.56.|Y
01|121543|1|1|TABLE IS BEING SOLD TO REPLACE SN: 30345TC|Y
01|121548|1|1|*external Cool|Y
01|121548|3|1|**Internal Coolant and can run dry|Y
01|121549|1|1|Reference RGA# TAR-54199|Y
01|121549|1|2|CNC201 s/n: 1538|N
01|121575|1|1|22.4025 GLOBAL CNC PART #|Y
01|121575|2|1|LONG VERSION OF 22.4025|Y
01|121575|7|1|GLOBAL PART # 51.4040|Y
01|121593|21|1|Position block made by L&N|Y
01|121593|21|2|Spindle drawing confirmation required.|Y
01|121594|1|1|5AX-2MT-170-200MA-M|Y
01|121594|2|1|2 full sets of cables|Y
01|121594|3|1|Includes on-site I/F & Installation by L-N Service Tech|Y
01|121596|1|1|SPECIAL PRICING. CUSTOMER RESPONSIBLE FOR INSTALLATION|Y
01|121596|1|2|IF LYNDEX NIKKEN NEEDS TO SERVICE ADDITIONAL CHARGE|Y
01|121596|1|3|MAY BE ADDED|Y
01|121596|3|1|POWER/FEEDBACK CABLE SET INCLUDED|Y
01|121598|1|1|Quoted as NET pricing|Y
01|121601|5|1|*replaces old part# C50-9000(H)|Y
01|121601|5|2|**Qty typically to match Qty of CAT50 tool holders|Y
01|121620|1|1|***NON-CANCEL NON-RETURNABLE***|Y
01|121620|10|1|***NON-CANCEL NON-RETURNABLE***|Y
01|121622|1|1|This is a USED Testbar quoted at 50% off|Y
01|121626|1|1|Non standard stock itemnon cancelable not returnable|Y
01|121626|1|2|Based on standard 60mm pitch|Y
01|121626|2|1|Non standard stock itemnon cancelable not returnable|Y
01|121626|2|2|Based on the 60mm standard pitch|Y
01|121626|4|1|NET price item per promo price|Y
01|121648|2|1|quoted as an in stock option for line 1|Y
01|121648|5|1|Wrench for ER32 Collet chucks|Y
01|121648|7|1|quoted as an in stock option for line 6|Y
01|121662|1|1|117960|Y
01|121662|2|1|174944|Y
01|121662|3|1|117973|Y
01|121665|1|1|**Min order required of 200pcs|Y
01|121665|2|1|Quantity break pricing.|Y
01|121665|2|2|500+pc pricing|Y
01|121665|5|1|**Min order required of 200pcs|Y
01|121665|6|1|Quantity break pricing.|Y
01|121665|6|2|500+pc pricing|Y
01|121681|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|121715|1|1|RGA # TAR-54211|Y
01|121715|1|2|CNCZ201LFA SN: 8158|Y
01|121717|3|1|CAT50-SF0187-3.15|Y
01|121717|3|2|CAT50 3/16 Shrink Fit Holder w NO Coolant Ports|Y
01|121717|4|1|CAT50-SF0312-3.15CP|Y
01|121717|4|2|CAT50 5/16 Shrink Fit Holder w Pluggable Coolant Ports|Y
01|121729|1|1|BT30-SK13-75:BT30 SK13 Slim Chuck 75mm Gage Length|Y
01|121729|1|2|Please Note: BT30-SK13-75 is non standard stock.|Y
01|121729|1|3|Once a purchase order is placed it cannot be cancelled|Y
01|121729|1|4|or returned.|Y
01|121738|1|1|S-BT40-FMA25.4CS-75-M|Y
01|121738|1|2|Special for Aisin No cancelable No returnable|Y
01|121738|4|1|S-HSK63A-FMA25.4CS-60-M|Y
01|121738|4|2|Special for Aisin No cancelable No returnable|Y
01|121738|5|1|HSK63A-FMA25.4-50|Y
01|121749|2|1|INSTALLAITON INCLUDES INTERNAL CABLE BULKHEAD|Y
01|121749|2|2|CONNECTORS FIBRE OPTIC CABLES ADDITIONAL DRIVES|Y
01|121749|2|3|SERVO MOTORS AND WIRE HARNESS LABOR TRAVEL TRAINING.|Y
01|121749|3|1|1 full set of cables|Y
01|121750|9|1|INSTALLAITON INCLUDES INTERNAL CABLE BULKHEAD|Y
01|121750|9|2|CONNECTORS FIBRE OPTIC CABLES ADDITIONAL DRIVES|Y
01|121750|9|3|SERVO MOTORS AND WIRE HARNESS LABOR TRAVEL TRAINING.|Y
01|121750|10|1|1 set of cables|Y
01|121770|1|1|NCAT40-SF4-160CP|Y
01|121770|3|1|NCAT40-SF4-80CP|Y
01|121770|5|1|NCAT40-SF5-160CP|Y
01|121770|7|1|NCAT40-SF5-80CP|Y
01|121770|9|1|NCAT40-SF0187-3.15CP|Y
01|121770|11|1|NCAT40-SF6-160CP|Y
01|121770|13|1|NCAT40-SF6-80CP|Y
01|121779|1|1|5AX-1200AFA-140|Y
01|121779|1|2|Special Order Model|Y
01|121779|1|3|Includes Scales for each Axis|Y
01|121779|1|4|Not include Motors|Y
01|121779|1|5|Motors will be provided by customers|Y
01|121779|1|6|Not include Cables|Y
01|121779|1|7|Delivery point Free on Truck at Kuraki Japan Factory|Y
01|121779|1|8|Speical order no cancelation uopn PO|Y
01|121779|1|9|Taxes not included|Y
01|121779|1|10|Adding special riser (height adjustment)|Y
01|121782|5|1|Quoted as an in stock option and alt for 4 GL|Y
01|121811|3|1|Alternative for 032-span|Y
01|121811|13|1|Offered as in stock option for line 12|Y
01|121829|1|1|Takisawa|Y
01|121835|6|1|Motor: Fanuc A8is (A06B-0235-B000)|Y
01|121835|7|1|Motor: Fanuc A8is (A06B-0235-B000)|Y
01|121835|9|1|Includes Installation Bulkhead Cables External Cables|Y
01|121835|9|2|Service Time & Travel.|Y
01|121839|1|1|CNC202LFA(6+1RJ)mtach with S/N:20105T|Y
01|121839|1|2|Rotary Table 200mm Left w/ 6+1 rotary joint|Y
01|121839|1|3|Shipping from Japan will be via Boat (Ocean)|Y
01|121839|1|4|Current delivery subject to change|Y
01|121839|1|5|Special model no cancelation no refund upon PO|Y
01|121839|1|6|Showing NET PRICE|Y
01|121839|1|7|Not include motor|Y
01|121839|1|8|Not include cables|Y
01|121861|2|1|Fanuc drive unit (31iB control)|Y
01|121866|1|1|**Net Price**|Y
01|121866|1|2|Modified DIN - cannot be returned|Y
01|121868|2|1|This item is non standard and considered special|Y
01|121868|2|2|Price is quoted as NET price.|Y
01|121882|2|1|** Closeout Promotion! All sales are FINAL!*|Y
01|121908|1|1|bt30-SK10-75 BT30 SK10 Slim Chuck 75mm Gage Length|Y
01|121908|1|2|Please Note: This toolholder is non standard stock.|Y
01|121908|1|3|Once a purchase order is placed it cannot be cancelled|Y
01|121908|1|4|or returned.|Y
01|121917|2|1|NEW SPINDLE|Y
01|121917|2|2|PART # CN202R002|Y
01|121917|20|1|MRC 5210KF Bearings for Piston|Y
01|121918|1|1|Wire Harness Set for CNC250-FA s/n: 4103|Y
01|121925|1|1|BMT75-MI63X-ICE|Y
01|121925|1|2|BMT75; Straight X-Axis; MI63 output; L=89mm;|Y
01|121925|1|3|1:1 gear; max 100 Nm; 6000RPM;|Y
01|121925|1|4|Int/ Ext coolant 1015 PSI|Y
01|121925|1|5|Ref drwg # 00056114|Y
01|121925|2|1|BMT75-MI63X-ICE|Y
01|121925|2|2|SAME DESCRIPTION AS ABOVE QUANTITY DISCOUNT|Y
01|121925|3|1|BMT75-MI63Z-ICE|Y
01|121925|3|2|BMT75; 90 Deg Z-Axis; MI63 output; L1=60mm center ht|Y
01|121925|3|3|1:1 gear; max 80 Nm; 6000RPM; Direction rotation|Y
01|121925|3|4|reversal; Int/ Ext coolant 1015 PSI|Y
01|121925|3|5|Ref drwg # 00055735 but with Mimatic MI63|Y
01|121925|4|1|BMT75-MI63Z-ICE|Y
01|121925|4|2|SAME DESCRIPTION AS ABOVE QUANTITY DISCOUNT|Y
01|121962|1|1|Repair Quote for 5AX-2002FA-M S/N: 1524|Y
01|121962|1|2|RGA # TAR-54090|Y
01|121962|2|1|New Rotary Assembly Housing|Y
01|121962|2|2|Price includes new Worm Wheel/Worm Screw|Y
01|121962|2|3|Bearings/Seals/O-Rings/Casting/Spindle|Y
01|121978|6|1|BUDGETARY COST FOR TRUNNION.|Y
01|121978|6|2|SUPPLIED DRAWINGS AND PICTURES DID NOT ADEQUATELY|Y
01|121978|6|3|DIMENSION THE TRUNION TO BE ABLE TO QUOTE FOR MFG.|Y
01|121978|6|4|COST COULD VARY AFTER PO DURING THE APPROVAL PROCESS.|Y
01|121978|7|1|BUDGETARY COST FOR V BLOCK ON TRUNION|Y
01|121978|7|2|SUPPLIED DRAWINGS AND PICTURES DID NOT ADEQUATELY|Y
01|121978|7|3|DIMENSION THE TRUNION TO BE ABLE TO QUOTE FOR MFG.|Y
01|121978|7|4|COST COULD VARY AFTER PO DURING THE APPROVAL PROCESS.|Y
01|121978|8|1|Installation includes: Drive unit short bar fiber|Y
01|121978|8|2|optic cable communications cable bulkhead cables|Y
01|121978|8|3|external cables parameter changes service time and|Y
01|121978|8|4|travel.|Y
01|121978|8|5|Cost also includes installing TAT-250 and trunion|Y
01|121981|1|1|Repair of CNC260FA-M S/N 10620|Y
01|121984|1|1|C6-MMC8C-90 or -120|Y
01|121984|1|2|Capto 6 Mini-Mini Chuck|Y
01|121986|2|1|please ask your customer if they need a wrench|Y
01|121998|1|1|Mimatic Part #195245 BMT65 LIVE TOOL; SK16; STRAIGHT;|Y
01|121998|1|2|Y-AXIS DUAL OUTPUT;|Y
01|121998|1|3|REF DRWG # 00056065 MOUNTING INTERFACE FOR HAAS ST25Y|Y
01|121998|1|4|Quoted at Net Price|Y
01|122016|1|1|Tooling certificate program does not apply.|Y
01|122017|1|1|19992-2395-081619|Y
01|122019|1|1|Lyndex Nikken to machine the block based on machine|Y
01|122019|1|2|make and model|Y
01|122019|2|1|End user creates the block from this blank|Y
01|122025|1|1|Reference RGA# TOR-54071|Y
01|122025|1|2|Repair of PF-2|Y
01|122025|2|1|Labor quoted for re-calibration.|Y
01|122044|1|1|WORKHOLDING NOT INCLUDED.|Y
01|122044|3|1|TWIN SPINDLE PNEUMATIC TAILSTOCK 175MM CENTERLINE|Y
01|122044|5|1|EXTERNAL CABLES SET FOR ROBODRILL|Y
01|122045|1|1|Updated from old part# C4027-0020-6.00|Y
01|122050|1|1|*Qty Break 1-4pcs|Y
01|122050|3|1|*Qty Break 5-9pcs|Y
01|122050|5|1|*Qty Break 10+pcs|Y
01|122054|2|1|INSTALLAITON INCLUDES INTERNAL CABLE BULKHEAD|Y
01|122054|2|2|CONNECTORS FIBRE OPTIC CABLES ADDITIONAL DRIVES|Y
01|122054|2|3|SERVO MOTORS AND WIRE HARNESS LABOR TRAVEL TRAINING.|Y
01|122054|3|1|1 full set of cables|Y
01|122057|1|1|Non-Cancellabel Non-Returnable|Y
01|122057|2|1|Non-Cancellabel Non-Returnable|Y
01|122058|1|1|without Makino Pins|Y
01|122061|1|1|Reference RGA# TOR-54193|Y
01|122061|1|2|C5005-0562-5.02 Tap broken inside|Y
01|122066|1|1|Repair of CNC202LFA S/N: 17209|Y
01|122066|1|2|REPAIR TAR-54197|Y
01|122066|25|1|REPAIR OF TAT-105 SN: 1558-B|Y
01|122066|25|2|REPAIR TAR-54197|Y
01|122078|12|1|*to install on HA40M-SK20 live tool|Y
01|122083|1|1|Repair of 5AX-201YA SN  5633|Y
01|122083|1|2|Tilting Axis|Y
01|122083|28|1|Repair of Rotary Axis|Y
01|122083|28|2|Parts Below|Y
01|122085|13|1|This item is considered special and cannot be cancelled|Y
01|122085|13|2|or returned once an order is placed.|Y
01|122112|4|1|Non-returnableNon-cancelable|Y
01|122112|5|1|Non-returnableNon-cancelable|Y
01|122112|6|1|Non-returnableNon-cancelable|Y
01|122115|2|1|Non-returnable Non-cancelable|Y
01|122115|3|1|Non-returnable Non-cancelable|Y
01|122115|4|1|Non-returnableNon-cancelable|Y
01|122116|9|1|** Closeout Promotion! All sales are FINAL!**|Y
01|122117|1|1|OUT OF STOCK UNTIL 11/09/19; SEE SUBSTITUTE @ BOTTOM|Y
01|122119|1|1|Service Call - 5AXZ-DD350FA s/n.1013|Y
01|122119|13|1|Expenses: Hotel $150/night x4days x2tech =$1200|Y
01|122119|13|2|Airfare $2000 x2tech =$4000|Y
01|122119|13|3|Meal $60/day x5days x2tech =$600|Y
01|122119|14|1|Transit USA<>MX $100/hr x11hr/day x2days x2tech=$4400|Y
01|122119|14|2|Transit in MX $100/hr x2hr/day x4days x2tech=$1600|Y
01|122119|15|1|Labor: $135/hr x10hr/day x3.5days x2tech = $9450|Y
01|122130|2|1|check if end user already has this required wrench|Y
01|122130|4|1|check if end user already has this required wrench|Y
01|122130|6|1|check if end user already has this required wrench|Y
01|122135|1|1|OUT OF STOCK UNTIL 11/09/19; SEE SUBSTITUTE @ BOTTOM|Y
01|122140|1|1|TAR-53507 5AX-800FA-RCN2-RJ6 s/n.1027 Overhaul|Y
01|122140|1|2|Repair at Nikken Japan|Y
01|122140|69|1|Reworking modificaiton labor charge|Y
01|122144|8|1|*only offered in 4 not 4.5 gl|Y
01|122144|10|1|Cross from PS-11123|Y
01|122146|1|1|OUT OF STOCK UNTIL 11/09/19; SEE SUBSTITUTE @ BOTTOM|Y
01|122157|5|1|Optional|Y
01|122158|7|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|122158|7|2|External Cables Service Time & Travel.|Y
01|122168|6|1|7/8 End Mill Holder is discontinued.|Y
01|122168|6|2|C5016-0875-6.00DIN is in stock. Coolant thru the flange|Y
01|122168|6|3|C5016-0875B   is in stock. This is a Balanceable holder|Y
01|122170|1|1|1 DEGREE INDEXER WITH HIRTH COUPLING|Y
01|122170|1|2|CONFIRMATION OF MACHINE DATA SHEETS WILL BE NEEDED|Y
01|122170|1|3|CONFIRMATION OF PROPER FIT TO MACHINE|Y
01|122170|1|4|LADDER MAY NEED TO BE CHANGED DUE TO 1 DEGREE INDEXING|Y
01|122170|1|5|(360 POSITIONS)|Y
01|122170|2|1|HYD. SOURCE NEEDED FOR BRAKE SYSTEM|Y
01|122170|4|1|EXTERNAL CABLE SET|Y
01|122180|2|1|Installation includes: drive unit short bar fiber|Y
01|122180|2|2|optic cables communication cables bulk head cable|Y
01|122180|2|3|set external cable set parameter changes service|Y
01|122180|2|4|time and travel|Y
01|122187|2|1|With internal coolant drawing must be approved.|Y
01|122187|2|2|Non standard item not cancelable nor returnable|Y
01|122187|2|3|NET PRICING|Y
01|122187|7|2|n|N
01|122187|8|1|With internal coolantdrawing must be approved|Y
01|122187|8|2|Item is non standard and is not cancelable nor|Y
01|122187|8|3|returnable once ordered|Y
01|122187|8|4|NET PRICING|Y
01|122189|1|1|THIS QUOTE DOES NOT INCLUDE SERVO MOTORS|Y
01|122189|1|2|LEAD TIME INCLUDES BOAT SHIPMENT FROM JAPAN|Y
01|122189|1|3|IF NEEDED SOONER AIR SHIPMENT IS AN OPTION SHIPPING|Y
01|122189|1|4|CHARGES APPLY. ESTIMATED $6200 EA TABLE.|Y
01|122190|1|1|PRICE INCLUDES 10 CAT40 HOLDERS WITH COOLANT PORTS|Y
01|122216|2|1|*5pc Min|Y
01|122216|4|1|*5pc MIN|Y
01|122216|8|1|*5pc MIN|Y
01|122216|10|1|*5pc MIN|Y
01|122216|13|1|*5pc MIN|Y
01|122216|18|1|*5pc MIN|Y
01|122216|18|1|*5pc MIN|Y
01|122216|21|1|*5pc MIN|Y
01|122216|24|1|*5pc MIN|Y
01|122216|25|1|*5pc MIN|Y
01|122216|26|1|*5pc MIN|Y
01|122216|29|1|*5pc MIN|Y
01|122216|33|1|*5pc MIN|Y
01|122216|38|1|*5pc MIN|Y
01|122216|38|1|*5pc MIN|Y
01|122216|41|1|*5pc MIN|Y
01|122224|1|1|HSK63A-HC10-85|Y
01|122224|2|1|HSK63A-HC14-90|Y
01|122231|2|1|Installation includes: Drive unit  short bar fiber|Y
01|122231|2|2|optic cable communications cable bulkhead cables|Y
01|122231|2|3|external cables parameter changes servie time and|Y
01|122231|2|4|travel.|Y
01|122238|1|1|CONFIRMATION OF WHO WILL BE INSTALLING ON MACHINE|Y
01|122238|1|2|LYNDEX NIKKEN CAN INSTALL|Y
01|122238|1|3|THIS QUOTE BASED ON CURRENT INFORMATION THAT WAS|Y
01|122238|1|4|SUPPLIED. NO WORKHOLDING SUPPLIED.|Y
01|122238|1|5|BASIC TABLE AND EXTERNAL CABLES QUOTED|Y
01|122246|1|1|SPECIAL PRICING. CUSTOMER RESPONSIBLE FOR INSTALLATION|Y
01|122246|1|2|IF LYNDEX NIKKEN NEEDS TO SERVICE ADDITIONAL CHARGE|Y
01|122246|1|3|MAY BE ADDED|Y
01|122246|3|1|POWER/FEEDBACK CABLE SET INCLUDED|Y
01|122250|1|1|With special faceplate(REF S/N 4576)|Y
01|122250|1|2|And A06B-2227-B000 Motor|Y
01|122250|1|3|Special Order. Non-cancellation products.|Y
01|122250|2|1|with special faceplate|Y
01|122250|2|2|Special Order. Non-cancellation products.|Y
01|122250|3|1|8+1 Rotary Joint for CNC260|Y
01|122250|4|1|4+1 Rotary Joint for TAT-200|Y
01|122250|5|1|External Power Cable|Y
01|122250|6|1|External Feedback Cable|Y
01|122259|1|1|CN181RRJ104030648  Built-in type|Y
01|122259|1|2|Center shaft 4 port RJ CNC180LFA|Y
01|122259|1|3|Special item not cancelable uopn PO|Y
01|122259|1|4|Delivery subjec to change|Y
01|122259|1|5|Validity of quote 30 days|Y
01|122259|1|6|Same item as Japan Order N-810986-001(CZ557 A519)|Y
01|122261|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122261|2|1|KM42-15.75|Y
01|122261|2|2|Non-returnablenon-cancelable|Y
01|122261|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122261|4|1|KM42-11.45|Y
01|122261|4|2|Non-returnablenon-cancelable|Y
01|122261|5|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122273|1|1|Please note: Net price is based upon a purchase order|Y
01|122273|1|2|of 30 or more knobs.|Y
01|122283|1|1|Includes 2x pots of your choice (SF-POT-XX)|Y
01|122285|1|1|**New design - available soon with coolant ports on|Y
01|122285|1|2|shell mill holder body**|Y
01|122285|3|1|Replacement slotted style arbor screw for customer's|Y
01|122285|3|2|existing C4001-22-50|Y
01|122288|4|1|Please Note: Retention knob promo: This offer is|Y
01|122288|4|2|limited to one retention knob per matching taper|Y
01|122288|4|3|toolholder.|Y
01|122297|1|1|Repair of Rotary Table CNC202LFA SN: 17212|Y
01|122297|1|2|TAR-54197|Y
01|122297|30|1|Repair of TAT-105 SN 1555-B|Y
01|122297|30|2|RGA TAR-54197|Y
01|122302|1|1|SK50 25MM HC x 87MM|Y
01|122302|2|1|HSK80A 16MM SF x 160MM|Y
01|122307|3|1|CONFIRMATION OF APPLICATION NEEDED.|Y
01|122307|3|2|QUOTE FOR PRICING ONLY|Y
01|122312|6|1|Please Note: Purchase a CAT40 holder and the|Y
01|122312|6|2|C40-1500-Mori-EU can be taken at $5.00 net each.|Y
01|122317|1|1|Includes cables.|Y
01|122319|6|1|Installation includes: Dual axis drive short bar|Y
01|122319|6|2|fiber optic cables communication cables bulkhead|Y
01|122319|6|3|cables external cables parameter changes service|Y
01|122319|6|4|time and travel.|Y
01|122319|6|5|DOES NOT INCLUDE FANUC ADDIONAL AXIS SOFTWARE OPTION|Y
01|122325|1|1|H023M12 A8J (chuck + adapter)|Y
01|122325|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122325|1|3|Adapter ETA 6 WKS|Y
01|122325|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122335|1|1|13485-2369-071919|Y
01|122340|1|1|Collet is non-returnable|Y
01|122350|10|1|6 GL not available|Y
01|122350|11|1|6 GL not available|Y
01|122350|27|1|Can be used drywithout coolant thru|Y
01|122350|33|1|Can be used dry without coolant thru|Y
01|122350|35|1|Can be used drywithout coolant thru|Y
01|122361|62|1|**This item is special cannot be cancelled or returned|Y
01|122361|67|1|**This item is special cannot be cancelled or returned|Y
01|122371|1|1|Includes 3x pots of your choice (SF-POT-XX)|Y
01|122371|1|2|CAT40|Y
01|122377|15|1|Only offer in 4 gl|Y
01|122377|15|2|unless you use standard CAT50 for this size|Y
01|122377|18|1|Only offer in 4 gl|Y
01|122377|18|2|unless you use standard CAT50 for this size|Y
01|122377|21|1|*N/A in dual contact|Y
01|122377|23|1|*offering in 6 gage length - check w/ customer|Y
01|122377|24|1|*only offer 2 gage length - check w/ cust|Y
01|122377|41|1|to hold 17/64|Y
01|122377|47|1|to hold 27/64|Y
01|122377|49|1|to hold 25/64|Y
01|122384|1|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|122384|2|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|122384|3|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|122384|4|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|122384|5|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|122384|8|1|SF5.5-C16-121 for Drawing 61095945.000|Y
01|122384|9|1|SF5.5-C16-121 for Drawing 61095945.000|Y
01|122384|10|1|SF5.5-C16-121 for Drawing 61095945.000|Y
01|122384|11|1|SF5.5-C16-121 for Drawing 61095945.000|Y
01|122384|12|1|SF5.5-C16-121 for Drawing 61095945.000|Y
01|122384|15|1|SF5.9-C16-121 for Drawing 60455996.000|Y
01|122384|16|1|SF5.9-C16-121 for Drawing 60455996.000|Y
01|122384|17|1|SF5.9-C16-121 for Drawing 60455996.000|Y
01|122384|18|1|SF5.9-C16-121 for Drawing 60455996.000|Y
01|122384|19|1|SF5.9-C16-121 for Drawing 60455996.000|Y
01|122384|22|1|SF6.2-C16-121 for Drawing 60455996.000|Y
01|122384|23|1|SF6.2-C16-121 for Drawing 60455996.000|Y
01|122384|24|1|SF6.2-C16-121 for Drawing 60455996.000|Y
01|122384|25|1|SF6.2-C16-121 for Drawing 60455996.000|Y
01|122384|26|1|SF6.2-C16-121 for Drawing 60455996.000|Y
01|122384|29|1|SF7.6-C16-121 for Drawing No Number Referenced|Y
01|122384|30|1|SF7.6-C16-121 for Drawing No Number Referenced|Y
01|122384|31|1|SF7.6-C16-121 for Drawing No Number Referenced|Y
01|122384|32|1|SF7.6-C16-121 for Drawing No Number Referenced|Y
01|122384|33|1|SF7.6-C16-121 for Drawing No Number Referenced|Y
01|122409|2|1|**Old style in stock|Y
01|122409|2|2|**New style - pluggable will be in stock on 9/27*|Y
01|122412|62|1|**This item is special cannot be cancelled or returned|Y
01|122412|67|1|**This item is special cannot be cancelled or returned|Y
01|122431|1|1|Installed w/ PS-N63AE at the factory|Y
01|122431|2|1|Installed on the NC5-63-SK16C-150 at factory|Y
01|122438|1|1|External Coolant|Y
01|122438|4|1|Internal/External Coolant & Runs Dry - SK20 Collet|Y
01|122448|1|1|Price shown as U.S. dollars US$|Y
01|122448|1|2|Speical item special discount|Y
01|122448|1|3|not cancelable upon PO|Y
01|122457|1|1|CONVERSION OF CNC302 SN: 6443|Y
01|122457|1|2|From Yaskawa (Hurco) Spec to Fancu (Mori CMX) Spec|Y
01|122457|1|3|Below are items that were used for the conversion|Y
01|122472|5|1|This quote is for preliminary pricing only|Y
01|122476|1|1|*Made for L&N C40RAM-ER32-180-65TP s/n# 5111902|Y
01|122476|1|2|*Machine: Haas VF-4|Y
01|122476|1|3|Duplicating set-up on another machine.|Y
01|122483|19|1|KM42-14.9|Y
01|122483|30|1|KM42-11.5|Y
01|122483|32|1|KM42-20.4|Y
01|122483|34|1|KM42-11.9|Y
01|122483|35|1|KM42-12.2|Y
01|122483|38|1|KM42-11.9|Y
01|122483|42|1|KM42-15.85|Y
01|122483|43|1|KM42-16.45|Y
01|122483|44|1|KM42-15.5|Y
01|122483|47|1|KM42-10.7|Y
01|122483|48|1|KM42-9.5|Y
01|122483|51|1|KM42-12.95|Y
01|122483|52|1|KM42-10.22|Y
01|122483|53|1|KM42-11.95|Y
01|122483|54|1|KM42-17.45|Y
01|122483|56|1|KM42-6.8|Y
01|122483|58|1|KM42-13.45|Y
01|122483|59|1|KM42-6.1|Y
01|122483|60|1|KM42-15.35|Y
01|122483|61|1|KM42-15.2|Y
01|122483|62|1|KM42-14.6|Y
01|122483|65|1|KM42-13.9|Y
01|122483|66|1|KM42-18.5|Y
01|122483|67|1|KM42-8.1|Y
01|122483|68|1|KM42-21.9|Y
01|122483|76|1|KM42-15.1|Y
01|122483|78|1|KM42-7.2|Y
01|122483|82|1|KM42-16.5|Y
01|122483|86|1|KM42-10.4|Y
01|122483|87|1|KM42-19.5|Y
01|122483|88|1|KM42-19.45|Y
01|122483|89|1|KM42-18.45|Y
01|122483|91|1|KM42-14.8|Y
01|122483|95|1|KM42-21.5|Y
01|122485|1|1|Installation includes: drive unit short bar fiber|Y
01|122485|1|2|optic cables communication cables bulk head cable|Y
01|122485|1|3|set external cable set parameter changes service|Y
01|122485|1|4|time and travel|Y
01|122495|1|1|Balance amount due on RGA# TAR-53730|Y
01|122495|1|2|5AX-201FA s/n: 5306|Y
01|122495|2|1|Balance amount due on RGA# TAR-53730|Y
01|122495|2|2|5AX-201FA s/n: 5306|Y
01|122497|1|1|BMT65-ER25-AD-ICE (to be added to NERP)*NET PRICE*|Y
01|122497|1|2|BMT65; ER25; ADJ 107DEG;L=144mm:Int/Ext coolant 1015PSI|Y
01|122497|1|3|1:1 Gear;24Nm;6500 RPM;ref drw #00054133|Y
01|122497|1|4|Lead time starts at drawing approval.Item is considered|Y
01|122497|1|5|a special and will not be cancelable nor returnable|Y
01|122497|1|6|once and order is placed|Y
01|122503|1|1|Reference RGA# CUR-54114|Y
01|122503|1|2|Repair of NC40RAM-ER20-225TS s/n: 52241 01|Y
01|122503|1|3|(Mimatic# 180779)|Y
01|122503|2|1|All bearings seals and o-rings to be replaced.|Y
01|122503|2|2|Damaged gears & worn locating pin need to be replaced.|Y
01|122503|4|1|Repair of NC40RAM-ER20-225TS s/n: 83835 01|Y
01|122503|4|2|(Mimatic# 180779)|Y
01|122503|5|1|All bearings seals and o-rings to be replaced.|Y
01|122503|5|2|Broken gears ER20 spindle and locking sleeve to be|Y
01|122503|5|3|replaced.|Y
01|122507|3|1|Added as in stock option to combine this 16mm collet|Y
01|122507|3|2|with the ER32 holder instead of waiting for the ER16|Y
01|122517|2|1|Replaces TCE-38103|Y
01|122518|5|1|Installation includes: drive unit short bar fiber|Y
01|122518|5|2|optic cables communication cables bulk head cable|Y
01|122518|5|3|set external cable set parameter changes service|Y
01|122518|5|4|time and travel|Y
01|122522|5|1|OP10/1-1|Y
01|122522|9|1|OP10/1-4|Y
01|122522|10|1|OP10/1-4|Y
01|122522|11|1|OP1/1-4|Y
01|122522|14|1|OP10/1-5|Y
01|122522|15|1|OP10/1-5|Y
01|122522|21|1|OP20/2-3|Y
01|122522|22|1|OP20/2-3|Y
01|122522|25|1|OP20/2-4|Y
01|122522|26|1|OP20/2-4|Y
01|122522|29|1|OP20/2-5|Y
01|122522|30|1|OP20/2-5|Y
01|122522|33|1|OP20/2-6|Y
01|122522|34|1|OP20/2-6|Y
01|122522|38|1|OP20/2-7|Y
01|122522|39|1|OP20/2-7|Y
01|122522|42|1|OP20/2-8|Y
01|122522|43|1|OP20/2-8|Y
01|122522|46|1|OP20/2-9|Y
01|122522|47|1|OP20/2-9|Y
01|122522|51|1|OP20/2-10|Y
01|122522|52|1|OP20/2-10|Y
01|122522|55|1|OP20/2-11|Y
01|122522|56|1|OP20/2-11|Y
01|122522|60|1|OP20/2-13|Y
01|122524|2|1|Add slots to A1/2-20 for 1/2 Shell Mill Holder|Y
01|122524|2|2|Quoted at NET price|Y
01|122536|1|1|C4005-0875-5.79(C) CAT40 #2 Tension/compression Tap|Y
01|122536|1|2|Holder|Y
01|122536|4|1|Please consider this tap holder as a replacement for|Y
01|122536|4|2|B5005-0875-5.55 which is discontinued after the 5|Y
01|122536|4|3|holders are gone.|Y
01|122547|6|1|EXTERNAL CABLE SET BOTH AXIS|Y
01|122547|9|1|Includes drive units fiber optic cables interface|Y
01|122547|9|2|cables short bar travel and expenses|Y
01|122547|9|4|LADDER NEEDS CONFIRMATION TO SUPPORT A 5TH AXIS|Y
01|122547|12|1|NIKKEN SK COLLET CHUCK WITH MITSUBISHI ENDMILLS|Y
01|122560|1|1|Repair of AA21 Controller|Y
01|122560|1|2|TAR-54119|Y
01|122560|1|3|Below are items needed to repair the control box|Y
01|122560|5|1|Repair of CNC180A21 SN: 8815H|Y
01|122560|5|2|TAR-54119|Y
01|122570|1|1|Price is quote as NET price|Y
01|122578|10|1|Labor $135 x 8 hours x 3 days(Engineer from Lyndex USA)|Y
01|122578|11|1|Transit Time:$100 x 24 Total Hours (USA to Mexico)|Y
01|122578|11|2|Transit Time:$100 x2hours x3days (Hotel<>Nexteer)|Y
01|122578|11|3|Flight: $1500 Chicago to Mexico(from Lyndex USA)|Y
01|122578|11|4|Hotel: $100/nights x 4 nights(Engineer from Lyndex USA)|Y
01|122578|11|5|Meal: $40/day x 5 days (Engineer frmo Lyndex)|Y
01|122578|12|1|Labor $135 x 8 hrs x 3days(Engineer from Lyndex Mexico)|Y
01|122578|13|1|Transit time: $100 x 2 hrs x 3 days (Engineer from|Y
01|122578|13|2|Lyndex)|Y
01|122578|13|3|Meal: $40/day x 3 days|Y
01|122597|10|1|6 GL not available|Y
01|122597|11|1|6 GL not available|Y
01|122597|27|1|Can be used drywithout coolant thru|Y
01|122597|33|1|Can be used dry without coolant thru|Y
01|122597|35|1|Can be used drywithout coolant thru|Y
01|122603|28|1|Can be used drywithout coolant thru|Y
01|122603|34|1|Can be used dry without coolant thru|Y
01|122618|1|1|C4005-0875-5.79(C) CAT40 #2 Tension/compression Tap|Y
01|122618|1|2|Holder|Y
01|122618|4|1|Please consider this tap holder as a replacement for|Y
01|122618|4|2|B5005-0875-5.55 which is discontinued after the 5|Y
01|122618|4|3|holders are gone.|Y
01|122619|2|1|Range: .594-.656 TIR: .0004 or Better|Y
01|122638|2|1|1 collet in set is on b/o  ETA 9/26 to complete set|Y
01|122638|3|1|3 collets in set on b/o 2 = ship 2 weeks  1 = ETA 9/30|Y
01|122638|3|2|to complete the set|Y
01|122641|1|1|Reference RGA# TOR-53924|Y
01|122641|1|2|Repair of ELETTRONICA PV450 s/n: 77010|Y
01|122641|1|3|Machine model: E450 s/n: 3305 Year: 2006|Y
01|122641|2|1|The parts below need to be replaced.|Y
01|122641|2|2|LCD display Keyboard weldings reconditionings|Y
01|122641|2|3|Backlighted graphics LCD Pin header female Protection|Y
01|122641|2|4|film dedicated electronics keybord for E238 Series|Y
01|122641|3|1|Ship to Elbo Controlli in Italy|Y
01|122641|4|1|Ship from Elbo Controlli in Italy|Y
01|122684|1|1|** Set of 2pcs each **|Y
01|122685|1|1|CAT50-SK16CF-165UP - swap nut to high speed|Y
01|122686|1|1|*** SPECIAL PRICING - ONE TIME ONLY ***|Y
01|122705|3|1|Free of charge (this time only)|Y
01|122728|1|1|*Note we are currently experiencing a delay in delivery|Y
01|122730|5|1|Use for .203 Drill|Y
01|122730|6|1|Use for .159 Drill|Y
01|122730|14|1|Use for .159 Drill|Y
01|122730|15|1|Use for .203 Drill|Y
01|122730|16|1|Use for 17/64 Drills|Y
01|122730|17|1|Use for 19/64 Drills|Y
01|122744|1|1|3J Collet per Winslow Automatics drawing OP40 Collet|Y
01|122744|1|2|Part Number XXXXX53|Y
01|122744|1|3|Net Price Quoted|Y
01|122744|2|1|3J Collet per Winslow Automatics drawing OP40 Collet|Y
01|122744|2|2|Part Number XXXXX45|Y
01|122744|2|3|Net Price Quoted|Y
01|122752|2|1|Installation includes: Drive unit  short bar fiber|Y
01|122752|2|2|optic cable communications cable bulkhead cables|Y
01|122752|2|3|external cables parameter changes servie time and|Y
01|122752|2|4|travel.|Y
01|122758|1|1|Interface Cable for CNC202AA21 on YCM Pallet Changer|Y
01|122758|1|2|From Junction Box to AA21 Control|Y
01|122771|1|1|T1|Y
01|122771|2|1|T2|Y
01|122771|3|1|T3|Y
01|122771|4|1|T4|Y
01|122771|5|1|T4|Y
01|122771|6|1|T5|Y
01|122771|7|1|T5|Y
01|122771|8|1|T6|Y
01|122771|9|1|T6|Y
01|122771|10|1|T7|Y
01|122771|11|1|T8|Y
01|122771|12|1|T9|Y
01|122771|13|1|T9|Y
01|122771|14|1|T10|Y
01|122771|15|1|T10|Y
01|122771|16|1|T11|Y
01|122771|17|1|T11|Y
01|122771|18|1|T12|Y
01|122771|19|1|T12|Y
01|122771|20|1|T14|Y
01|122771|21|1|T14|Y
01|122771|22|1|T15|Y
01|122771|23|1|T15|Y
01|122771|24|1|T16|Y
01|122771|25|1|T16|Y
01|122771|26|1|T17|Y
01|122771|27|1|T17|Y
01|122771|28|1|T18|Y
01|122771|29|1|T18|Y
01|122771|30|1|T19 - SK does not have Tap Collets.|Y
01|122771|31|1|T19 - Standard SK collet can be used to rigig tap.|Y
01|122771|33|1|T22|Y
01|122771|34|1|T22|Y
01|122771|35|1|T23|Y
01|122771|36|1|T23|Y
01|122771|37|1|T25|Y
01|122771|38|1|T25|Y
01|122771|39|1|T26|Y
01|122771|40|1|T26|Y
01|122771|41|1|T27|Y
01|122771|42|1|T27|Y
01|122771|43|1|T28|Y
01|122771|44|1|T28|Y
01|122771|45|1|T29|Y
01|122771|46|1|T29|Y
01|122771|47|1|T30|Y
01|122771|48|1|T30|Y
01|122771|49|1|T31|Y
01|122771|50|1|T31|Y
01|122771|51|1|T32|Y
01|122771|52|1|T32|Y
01|122771|53|1|T34|Y
01|122771|54|1|T34|Y
01|122771|56|1|T35|Y
01|122771|57|1|T36|Y
01|122771|58|1|T36|Y
01|122771|60|1|T37|Y
01|122771|61|1|T38|Y
01|122771|62|1|T38|Y
01|122771|63|1|T39|Y
01|122771|64|1|T39|Y
01|122771|65|1|T40|Y
01|122771|66|1|T40|Y
01|122771|67|1|T41|Y
01|122771|68|1|T41|Y
01|122771|69|1|T43|Y
01|122771|70|1|T43|Y
01|122771|71|1|T44|Y
01|122771|72|1|T44|Y
01|122771|73|1|T46|Y
01|122771|74|1|T46|Y
01|122771|75|1|T47|Y
01|122771|76|1|T47|Y
01|122771|77|1|T48|Y
01|122771|78|1|T48|Y
01|122771|79|1|T49|Y
01|122771|80|1|T49|Y
01|122771|81|1|T51|Y
01|122771|82|1|T51|Y
01|122771|83|1|T53|Y
01|122771|84|1|T53|Y
01|122771|85|1|T55|Y
01|122771|86|1|T55|Y
01|122771|87|1|T56|Y
01|122771|88|1|T56|Y
01|122771|89|1|T57|Y
01|122771|90|1|T57|Y
01|122772|2|1|4th Axis Interface Drives Cables & Intsallation by LN|Y
01|122772|3|1|External Cables to Bulk Head - FMT Install|Y
01|122776|2|1|If order is placed by 9/17 ETA will be 9/23.|Y
01|122776|2|2|If order is placed after 9/17 ETA will 9/30.|Y
01|122786|1|1|Includes: Table with motor hardwired cables cabinet|Y
01|122786|1|2|cables. Drive unit not included.|Y
01|122790|1|1|Includes: 180MM face plate rotary table without motor.|Y
01|122790|2|1|Direct mount cable set.|Y
01|122794|1|1|CNC100-3W-120MA-M|Y
01|122794|2|1|INSTALLAITON INCLUDES INTERNAL CABLE BULKHEAD|Y
01|122794|2|2|CONNECTORS FIBRE OPTIC CABLES ADDITIONAL DRIVES|Y
01|122794|2|3|SERVO MOTORS AND WIRE HARNESS LABOR TRAVEL TRAINING.|Y
01|122794|3|1|Full Set of Cables|Y
01|122794|6|1|Modifications necesary to install levers on to Rotary|Y
01|122794|6|2|Table|Y
01|122796|1|1|Reference RGA# LVR-54212|Y
01|122796|1|2|Repair of MNL12-ER32Z-MS s/n: A0547|Y
01|122796|1|3|(Alps# T32216)|Y
01|122796|2|1|Bearings O-rings Seals 2 x Collet Nuts & Bearing Nut|Y
01|122796|2|2|There will be a possibility to see more damages inside.|Y
01|122796|2|3|If gears or spindles are bad the cost will be $1807.65|Y
01|122802|8|1|INSTALLATION INCLUDES DRIVE CABLES EXTERNAL CABLES|Y
01|122802|8|2|TRAVEL AND LABOR INCLUDED|Y
01|122802|8|3|CONFIRMATION OF MACHINE LADDER NEEDED AND ADDITIONAL|Y
01|122802|8|4|AXIS NEEDED FROM FANUC ONCE CONFIRM ED BY MACHINE DATA|Y
01|122804|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122828|9|1|KM42-20.4|Y
01|122828|13|1|KM42-11.9|Y
01|122828|14|1|KM42-12.2|Y
01|122842|1|1|BT40 or HSK63A RAH L1=196.5L2-6mm: coolant through|Y
01|122842|1|2|positioning pin and through extrernal nozzle|Y
01|122842|1|3|1:4.96 Gear rationMax 3Nm torque;max input 1915 RMP|Y
01|122842|1|4|max output 9500 RPM ref drwg# 00056141|Y
01|122842|1|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122842|1|6|(1) PC pricing|Y
01|122842|2|1|BT40 or HSK63A RAH same specs as above|Y
01|122842|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122842|2|3|(2) PC pricing|Y
01|122842|3|1|BT40 or HSK63A RAH same specs as above|Y
01|122842|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122842|3|3|(3) PC pricing|Y
01|122842|4|1|BT40 or HSK63A RAH same specs as above|Y
01|122842|4|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122842|4|3|(4) PC pricing|Y
01|122842|5|1|BT40 or HSK63A RAH same specs as above|Y
01|122842|5|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|122842|5|3|(5) PC pricing|Y
01|122842|6|1|Quoted as NET pricing|Y
01|122860|3|1|Installation includes: Drive unit short bar fiber|Y
01|122860|3|2|optic cable communications cable bulkhead cables|Y
01|122860|3|3|external cables servie time and travel.|Y
01|122863|1|1|KM42-14.9|Y
01|122863|9|1|KM42-20.4|Y
01|122863|12|1|KM42-11.5|Y
01|122863|13|1|KM42-11.9|Y
01|122863|14|1|KM42-12.2|Y
01|122863|21|1|KM42-15.85|Y
01|122863|22|1|KM42-16.45|Y
01|122863|23|1|KM42-15.5|Y
01|122863|26|1|KM42-17.45|Y
01|122863|27|1|KM42-6.8|Y
01|122863|29|1|KM42-15.35|Y
01|122863|31|1|KM42-15.2|Y
01|122863|32|1|KM42-14.6|Y
01|122863|33|1|KM42-8.1|Y
01|122863|34|1|KM42-21.9|Y
01|122863|43|1|KM42-7.2|Y
01|122863|45|1|KM42-16.5|Y
01|122863|46|1|KM42-12.55|Y
01|122863|49|1|KM42-10.40|Y
01|122863|50|1|KM42-19.50|Y
01|122863|52|1|KM42-18.45|Y
01|122863|53|1|KM42-14.8|Y
01|122863|54|1|KM42-20.45|Y
01|122871|2|1|In stock version to the above|Y
01|122871|12|1|ETA PENDING|Y
01|122871|13|1|In stock version to the above|Y
01|122871|14|1|ETA IS PENDING|Y
01|122871|15|1|In stock version to the above|Y
01|122876|6|1|EXTERNAL CABLE SET BOTH AXIS|Y
01|122876|12|1|NIKKEN SK COLLET CHUCK WITH MITSUBISHI ENDMILLS|Y
01|122877|6|1|EXTERNAL CABLE SET BOTH AXIS|Y
01|122877|8|1|4th/5th axis install includes dual drives connectors|Y
01|122877|8|2|internal cable/harness fibre optic cables|Y
01|122877|8|3|travel and labor|Y
01|122877|8|4|MACHINE LADDER NEEDS TO BE CONFIRMED TO SUPPORT|Y
01|122877|8|5|ADDITIONAL AXIS. IF NEEDED GOSIGER TO BE RESPONSIBLE|Y
01|122877|12|1|NIKKEN SK COLLET CHUCK WITH MITSUBISHI ENDMILLS|Y
01|122883|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|122883|3|2|External Cables Service Time & Travel.|Y
01|122896|1|1|CATO C8 AGH; CATO6 OUTPUT;Flange mount 215mm;L=508 mm;|Y
01|122896|1|2|1:1 Gear; max torque 200Nm;max 4000RPM;|Y
01|122896|1|3|INT Coolant through spindle and pipe;|Y
01|122896|1|4|Ref drwg # 00046271-RAHOKUMA|Y
01|122896|1|5|(1) PC Pricing|Y
01|122896|1|6|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122896|2|1|Same specs as above|Y
01|122896|2|2|(2) PC pricing|Y
01|122896|2|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|122898|10|1|KM42-11.5|Y
01|122898|11|1|KM42-11.9|Y
01|122898|12|1|KM42-12.2|Y
01|122898|21|1|KM42-15.85|Y
01|122898|22|1|KM42-16.45|Y
01|122898|23|1|KM42-15.5|Y
01|122898|26|1|KM42-17.45|Y
01|122898|27|1|KM42-6.8|Y
01|122898|29|1|KM42-15.35|Y
01|122898|31|1|KM42-15.2|Y
01|122898|32|1|KM42-14.60|Y
01|122898|33|1|KM42-8.1|Y
01|122898|34|1|KM42-21.9|Y
01|122898|43|1|KM42-7.2|Y
01|122898|45|1|KM42-16.5|Y
01|122898|46|1|KM42-12.55|Y
01|122898|49|1|KM42-10.4|Y
01|122898|50|1|KM42-19.5|Y
01|122898|52|1|KM42-18.45|Y
01|122898|53|1|KM42-14.8|Y
01|122898|54|1|KM42-20.45|Y
01|122935|1|1|With internal and external coolant|Y
01|122950|10|1|No Torque Wrench Adapter for MMC Holders|Y
01|122950|15|1|Alternative option for NCAT|Y
01|122950|15|2|enough stock for balance|Y
01|122950|18|1|ALT to NCAT enough stock for balance|Y
01|122950|19|1|ALT to NCAT 18 PCS avail|Y
01|122950|30|1|SKJ6-1/16|Y
01|122950|31|1|SKJ6-3/32|Y
01|122950|73|1|207 Pull Studs; 1 Per Holder|Y
01|122950|74|1|Extra 140 Pull Studs Requested|Y
01|122950|93|1|Coolant-Thru Backup Screws for 1 Milling Chucks|Y
01|122974|2|1|ref. old part# C5031-1500-8.00|Y
01|122975|5|1|Includes drive unit interface cables external cables|Y
01|122975|5|2|short bar communications cable fiber optic cable|Y
01|122975|5|3|travel labor expenses|Y
01|122984|1|1|RGA: CUR-54047|Y
01|122984|1|2|Repair Quote for H63ARAM-ER25-187OTC|Y
01|122984|1|3|Serial #4582902|Y
01|122984|2|1|Repair includes Bearings/Seals/O-Rings + Labor|Y
01|122984|2|2|Delivery is around 2-3 Weeks upon reciept of PO|Y
01|122988|4|1|Use with W10R5-0875-4.4 Tapping Head|Y
01|122996|2|1|*Wrench for Collet Nut|Y
01|123007|4|1|Cost is NET to AMTTECH|Y
01|123007|4|2|Installation includes: Drive unit short bar fiber|Y
01|123007|4|3|optic cable communications cable bulkhead cables|Y
01|123007|4|4|external cables parameter changes service time and|Y
01|123007|4|5|travel.|Y
01|123011|5|1|Cost is NET to AMTTECH|Y
01|123011|5|2|Installation includes: Drive unit short bar fiber|Y
01|123011|5|3|optic cable communications cable bulkhead cables|Y
01|123011|5|4|external cables parameter changes service time and|Y
01|123011|5|5|travel.|Y
01|123017|6|1|HSK63F Spindle - NO PIN HOLES|Y
01|123017|7|1|HSK63F|Y
01|123022|4|1|For HSK63F|Y
01|123026|1|1|Reference RGA# LVR-53773|Y
01|123026|1|2|Repair of MZQT47-ER32Z-MS-OFF-C s/n: 7655201|Y
01|123026|1|3|MIM# 167955|Y
01|123026|2|1|Housing bearings seals & o-rings must be replaced.|Y
01|123026|2|2|Price includes labor.|Y
01|123044|1|1|***Cannot accept coolant tube!|Y
01|123044|1|2|L dimension is too short to thread properly|Y
01|123051|1|1|Repair of 5AX-130 SN 3709|Y
01|123051|1|2|Name Tag not on Table|Y
01|123051|1|3|TAR-54327|Y
01|123061|1|1|Installed w/ Nikken pull stud PS-N63AE at factory|Y
01|123061|2|1|Installed on NC5-63-SK10C-105 at factory|Y
01|123062|1|1|MUST HAVE INTERNAL THREADING|Y
01|123073|3|1|includes: Drive unit short bar fiber optic cables|Y
01|123073|3|2|bulkhead cables external cablesparameter changes|Y
01|123073|3|3|service time and travel.|Y
01|123073|3|4|Machine must have ladder for the additional axis.|Y
01|123075|7|1|HA40L-SK20Z-ICE|Y
01|123075|7|2|ETA 4-5 WKS|Y
01|123075|7|3|Non-returnable Non-cancelable|Y
01|123087|2|1|MOQ=5pc|Y
01|123091|1|1|Replacement part # for OKU-LT10-ZMN|Y
01|123093|6|1|** Closeout Promotion! All sales are FINAL!**|Y
01|123093|8|1|** Closeout Promotion! All sales are FINAL!**|Y
01|123104|1|1|THIS IS EXTERNAL COOLANT.|Y
01|123104|1|2|IF INTERNAL COOLANT IS REQUIRED LET ME KNOW I WILL HAVE|Y
01|123104|1|3|TO CHECK DELIVERY TIME.|Y
01|123104|1|4|INTERNAL COOLANT IS APPROX $500 MORE.  LEAD TIME|Y
01|123104|1|5|APPROX 22 WEEKS|Y
01|123107|1|1|Includes (2) free pots|Y
01|123107|2|1|Free Pot included with purchase of shrink fit unit|Y
01|123107|3|1|Free Pot included with purchase of shrink fit unit|Y
01|123111|1|1|TABLE INCLUDES SERVO MOTOR. M AT END OF PART NUMBER|Y
01|123111|1|2|SIGNIFIES MOTOR INCLUDED.|Y
01|123111|2|1|ADDITIONAL HOSES FOR SECOND TABLE|Y
01|123111|4|1|includes: Drive unit short bar fiber optic cables|Y
01|123111|4|2|bulkhead cables external cablesparameter changes|Y
01|123111|4|3|service time and travel.|Y
01|123111|4|4|Machine must have ladder for the additional 2 axis|Y
01|123114|7|1|*offered in 5 gage length not 6|Y
01|123114|12|1|**Offered in 4 projection w/ coolant ports|Y
01|123114|12|2|(Not AD/B)|Y
01|123114|13|1|**Offered in 6 projection w/ coolant ports|Y
01|123114|13|2|(Not AD/B)|Y
01|123114|15|1|*must use Lyndex-Nikken SK25 collets|Y
01|123114|15|2|**please ask customer what sizes are needed|Y
01|123114|15|3|**This is the crossover for the CAT50-HZ22-105|Y
01|123115|8|1|INSTALLATION INCLUDES DRIVE CABLES EXTERNAL CABLES|Y
01|123115|8|2|TRAVEL AND LABOR INCLUDED|Y
01|123115|8|3|CONFIRMATION OF MACHINE LADDER NEEDED AND ADDITIONAL|Y
01|123115|8|4|AXIS NEEDED FROM FANUC ONCE CONFIRM ED BY MACHINE DATA|Y
01|123126|1|1|Reference RGA# LVR-54296|Y
01|123126|1|2|Repair of OKL2-ER20X s/n: AL0112|Y
01|123126|1|3|(Alps# OK112-21000)|Y
01|123126|2|1|Bearings O-rings Seals Collet Nut Spindle Shaft to|Y
01|123126|2|2|be replaced.|Y
01|123131|5|1|DIRECT CHUCK DISC|Y
01|123140|3|1|Schunk vise + jaws + adapter plate|Y
01|123146|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|123146|2|1|M3HZ-25V|Y
01|123146|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|123147|1|1|$500 rebate per table to be issued after invoice|Y
01|123147|1|2|is paid|Y
01|123147|1|3|Applied only on 3 units ordered|Y
01|123156|1|1|P/N: PS-P   BT50 Pull Stud|Y
01|123161|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|123178|2|1|3/8-16 Tap|Y
01|123178|3|1|7/16-14|Y
01|123178|4|1|1/2-13 Tap|Y
01|123178|5|1|9/16-12 Tap|Y
01|123178|6|1|5/8-11 Tap|Y
01|123178|7|1|3/4-16 Tap|Y
01|123178|8|1|1-12 Tap|Y
01|123178|12|1|To be installed on HSK100A-SK25C-145|Y
01|123178|13|1|3/8-16 Tap|Y
01|123178|14|1|7/16-14 Tap|Y
01|123178|15|1|1/2-13 Tap|Y
01|123178|16|1|9/16-12 Tap|Y
01|123178|17|1|5/8-11 Tap|Y
01|123178|18|1|3/4-16 Tap|Y
01|123178|19|1|1-12 Tap|Y
01|123178|25|1|Modification charge to modify 1 pc for a .310 shank|Y
01|123178|25|2|It will be machined so a .310 gauge pin goes through|Y
01|123178|25|3|and a .311 gauge pin doesn't go through.  This won't|Y
01|123178|25|4|an o-ring|Y
01|123183|1|1|Reference RGA# LVR-53976|Y
01|123183|1|2|MZMP5-CT40Z s/n: 97613 01|Y
01|123183|1|3|(Mimatic# 124626)|Y
01|123183|2|1|Bearings seals and o-rings to be replaced.|Y
01|123183|2|2|Resurface spindles as needed.|Y
01|123196|18|1|New part number|Y
01|123196|19|1|New part number|Y
01|123200|2|1|Installation includes: Dual axis drive short bar|Y
01|123200|2|2|fiber optic cables communications cables bulkhead|Y
01|123200|2|3|cables external cables parameter changesservice|Y
01|123200|2|4|time and travel.|Y
01|123213|1|1|Tooling Certificate Number: 13220-XXXX-092319|Y
01|123219|1|1|Reference RGA# QUA-54183|Y
01|123219|1|2|1 x NCAT40-C1-85UG-IDU Sending in for evaluation.|Y
01|123219|5|1|Regreasing included.|Y
01|123221|1|1|KM1.1/4-14.3|Y
01|123221|1|2|Non-returnable non-cancelable|Y
01|123221|4|1|Non-returnable non-cancelable|Y
01|123223|1|1|Ref. 53618010100|Y
01|123223|2|1|ref. 53618010600|Y
01|123223|3|1|ref. 53208015100|Y
01|123228|6|1|NB4007-0040-3.13|Y
01|123228|10|1|BT40-SK20-XXX|Y
01|123228|11|1|NBT40-SK20-XXX|Y
01|123228|15|1|SKJ25-17C|Y
01|123228|19|1|SK25-17C or SK25-17AC|Y
01|123229|1|1|HFO Tampa to supply correct motors|Y
01|123229|1|2|HFO Tampa to supply cables|Y
01|123229|3|1|COLLET CHUCK PROMO KIT|Y
01|123229|3|2|NO CHARGE|Y
01|123231|1|1|RFQ # 313660|Y
01|123231|2|1|RFQ #313628|Y
01|123231|3|1|KM42-13.45|Y
01|123231|3|2|RFQ#313613|Y
01|123231|4|1|RFQ #313664|Y
01|123231|5|1|KM42-14.6|Y
01|123231|5|2|RFQ #313527|Y
01|123231|6|1|KM42-15.2|Y
01|123231|6|2|RFQ #313525|Y
01|123231|7|1|KM42-15.5|Y
01|123231|7|2|RFQ #313632|Y
01|123231|8|1|KM42-15.35|Y
01|123231|8|2|RFQ #313624|Y
01|123231|9|1|KM42-18.5|Y
01|123231|9|2|RFQ#313531|Y
01|123231|10|1|RFQ #313526|Y
01|123231|11|1|RFQ #313543|Y
01|123231|12|1|RFQ #313621|Y
01|123231|13|1|KM42-17.45|Y
01|123231|13|2|RDFQ#313614|Y
01|123231|14|1|RFQ#313636|Y
01|123231|15|1|RFQ#313663|Y
01|123231|16|1|RFQ#313643|Y
01|123231|17|1|KM42-8.1|Y
01|123231|17|2|RFQ #313535|Y
01|123231|18|1|RFQ#313540|Y
01|123231|19|1|RFQ#313639|Y
01|123231|20|1|KM42-10.22|Y
01|123231|20|2|RFQ#313604|Y
01|123231|21|1|KM42-11.5|Y
01|123231|21|2|RFQ#313577|Y
01|123231|22|1|KM42-12.95|Y
01|123231|22|2|RFQ#313603|Y
01|123231|23|1|RFQ#313579|Y
01|123231|24|1|KM42-16.45|Y
01|123231|24|2|RFQ#313620|Y
01|123231|25|1|RFQ#313582|Y
01|123231|26|1|RFQ#313541|Y
01|123231|27|1|RFQ#313588|Y
01|123231|28|1|RFQ#313616|Y
01|123231|29|1|RFQ#313618|Y
01|123231|30|1|RFQ #313602|Y
01|123231|31|1|RFQ#313638|Y
01|123231|32|1|KM42-6.8|Y
01|123231|32|2|RFQ#313617|Y
01|123231|33|1|RFQ#313607|Y
01|123231|34|1|KM42-13.9|Y
01|123231|34|2|RFQ#313536|Y
01|123231|35|1|KM42-14.9|Y
01|123231|35|2|RFQ#313609|Y
01|123231|36|1|RFQ#313631|Y
01|123231|37|1|KM42-20.4|Y
01|123231|37|2|RFQ#313581|Y
01|123231|38|1|KM42-21.9|Y
01|123231|38|2|RFQ#313539|Y
01|123231|39|1|RFQ#313635|Y
01|123231|40|1|RFQ#313642|Y
01|123231|41|1|KM42-6.9|Y
01|123231|41|2|RFQ#313647|Y
01|123231|42|1|KM42-6.10|Y
01|123231|42|2|RFQ#313606|Y
01|123231|43|1|RFQ#313650|Y
01|123231|44|1|RFQ#313654|Y
01|123231|45|1|RFQ#313544|Y
01|123231|46|1|RFQ#313611|Y
01|123231|47|1|RFQ#313661|Y
01|123231|48|1|RFQ#313610|Y
01|123231|49|1|RFQ#313623|Y
01|123231|50|1|RFQ#313622|Y
01|123231|51|1|RFQ#313652|Y
01|123231|52|1|RFQ#313601|Y
01|123231|53|1|KM42-11.9|Y
01|123231|53|2|RFQ#313583|Y
01|123231|54|1|KM42-11.95|Y
01|123231|54|2|RFQ#313612|Y
01|123231|55|1|KM42-12.2|Y
01|123231|55|2|RFQ#313587|Y
01|123242|1|1|Please Note: Net price is based upon a complete order|Y
01|123242|1|2|of 30 knobs or more.|Y
01|123260|1|1|Item is considered a non standard speicial and is not|Y
01|123260|1|2|cancelable nor returnable once an order is placed|Y
01|123270|5|1|Optional and Recommended.|Y
01|123278|6|1|HSK50E-C20-95G|Y
01|123289|3|1|Cable Sets|Y
01|123294|1|1|3416.00000 Hi-Q ER16 nut|Y
01|123304|4|1|HSK100A-C3/4-200G|Y
01|123304|5|1|HSK100A-C3/4-200G|Y
01|123304|8|1|HSK100A-C3/4-300G|Y
01|123304|9|1|HSK100A-C3/4-300G|Y
01|123304|15|1|HSK100A-C1-200G|Y
01|123304|16|1|HSK100A-C1-200G|Y
01|123304|19|1|HSK100A-C1-300G|Y
01|123304|20|1|HSK100A-C1-300G|Y
01|123305|1|1|Price is the same for 1-10 pcs.|Y
01|123305|2|1|Quoted as NET pricing|Y
01|123322|1|1|BT30-SF6-80CP BT30 6.0mm Shrink Fit Holder 80mm gage|Y
01|123322|1|2|length with Coolant Ports.|Y
01|123322|3|1|BT30-SF8-80CP BT30 8.0mm Shrink Fit Holder 80mm gage|Y
01|123322|3|2|length with Coolant Ports|Y
01|123322|4|1|BT30-SF10-80CP BT30 10mm Shrink Fit Holder 80mm gage|Y
01|123322|4|2|length with Coolant Ports|Y
01|123329|1|1|BT40 or HSK63A RAH L1=196.5L2-6mm: coolant through|Y
01|123329|1|2|positioning pin and through extrernal nozzle|Y
01|123329|1|3|1:4.96 Gear rationMax 3Nm torque;max input 1915 RMP|Y
01|123329|1|4|max output 9500 RPM ref drwg# 00056141|Y
01|123329|1|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|123329|1|6|(12)PC pricing|Y
01|123332|1|1|Quoted as net price no returnable no cancellable|Y
01|123332|1|2|Takisawa liveIndex tang 2 flat; - D=55/ S1=59/ AF 8mm;|Y
01|123332|1|3|SK20; STR OFFSET V=82;L=107.5mm;Int/ Ext coolant|Y
01|123332|1|4|1:1 Gear; Max 40Nm; Max 5000 RPM;Ref drwg # 00056175|Y
01|123332|2|1|Quoted as net price no returnable no cancellable|Y
01|123332|2|2|Price for Drwg#00056175 for 5pcs|Y
01|123332|3|1|Quoted as net price no returnable no cancellable|Y
01|123332|3|2|Price for Drwg#00056175 for 10pcs|Y
01|123332|4|1|Quoted as net price no returnable no cancellable|Y
01|123332|4|2|Takisawa liveIndex tang 2 flat; - D=55/ S1=59/ AF 8mm;|Y
01|123332|4|3|SK16; STR OFFSET V=82;L=107.5mm;Int/ Ext coolant|Y
01|123332|4|4|1:1 Gear; Max 40Nm; Max 5000 RPM;Ref drwg # 00056175|Y
01|123332|4|5|but with SK16 output|Y
01|123332|5|1|Quoted as net price no returnable no cancellable|Y
01|123332|5|2|Price for Drwg#00056175(but with SK16 out put)for 5pcs|Y
01|123332|6|1|Quoted as net price no returnable no cancellable|Y
01|123332|6|2|Price for Drwg#00056175(but with SK16 out put)for 10pc|Y
01|123334|2|1|Includes 4th axis Interface drives cables install|Y
01|123334|2|2|Confirmation of Machine Data Sheets|Y
01|123338|5|1|Installation Includes Interface Drive Cables install|Y
01|123338|5|2|Confirmation of machine Data Sheets|Y
01|123339|1|1|Delivery:3-pcs 1~2 Weeks/Bal 13~14 weeks|Y
01|123339|1|2|Quoted 1~9 Holders Net Price Quoted.|Y
01|123339|2|1|Delivery:3-pcs 1~2 Weeks/Bal 13~14 weeks|Y
01|123339|2|2|Quoted 10~19 Holders Net Price Quoted|Y
01|123339|3|1|Delivery:3-pcs 1~2 Weeks/Bal 13~14 weeks|Y
01|123339|3|2|Quoted 20+ holders Net Price Quoted|Y
01|123350|3|1|Misc Items to do conversion (Motor Gear/Solenoid/Cable)|Y
01|123350|6|1|Repair cost can vary from $4500 to $8000|Y
01|123374|6|1|This lead time is pending these being ordered in place|Y
01|123374|6|2|of the standard non CP holders.We have stock for either|Y
01|123374|6|3|or initially|Y
01|123375|2|1|Hose Solenoid Manifold Pressure switch Fittings are|Y
01|123375|2|2|included|Y
01|123375|3|1|Installation includes entering Rotary table parameters|Y
01|123375|3|2|set up Lyndex hydraulic pump & hoses|Y
01|123375|3|3|Rotary table cable management|Y
01|123375|3|4|Checking the table accuracy|Y
01|123375|3|5|(note) we don't lift and place the table on the machine|Y
01|123386|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|123386|4|1|5C COLLET CHUCK|Y
01|123386|4|2|RISER TUBE|Y
01|123386|4|3|DRAW TUBE|Y
01|123386|4|4|5C NOSE PIECE|Y
01|123386|4|5|SIMILAR TO 5AX-EXT-5AX2002-SP|Y
01|123386|7|1|HYD LINES/FITTINGS FOR 5C HYD SYSTEM|Y
01|123387|1|1|Spindle Wrench|Y
01|123387|2|1|Collet Nut wrench|Y
01|123390|2|1|POWER AND FEED BACK CABLE SET|Y
01|123390|3|1|Installation includes: Drive unit short bar fiber|Y
01|123390|3|2|optic cable communications cable bulkhead cables|Y
01|123390|3|3|external cables parameter changes service time and|Y
01|123390|3|4|travel.|Y
01|123391|1|1|TABLE INCLUDES SERVO MOTOR. M AT END OF PART NUMBER|Y
01|123391|1|2|SIGNIFIES MOTOR INCLUDED.|Y
01|123391|2|1|ADDITIONAL HOSES FOR SECOND TABLE|Y
01|123391|4|1|includes: Drive unit short bar fiber optic cables|Y
01|123391|4|2|bulkhead cables external cablesparameter changes|Y
01|123391|4|3|service time and travel.|Y
01|123391|4|4|Machine must have ladder for the additional 2 axis|Y
01|123392|1|1|Reference RGA# LVR-54244|Y
01|123392|1|2|MZQT47-ER25Z-MS s/n: 1744 15|Y
01|123392|1|3|(Mimatic# 124632)|Y
01|123392|2|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|123392|2|2|spindles as needed. Input Spindle to be replaced.|Y
01|123392|4|1|MZQT47-ER25Z-MS s/n: 60215|Y
01|123392|4|2|(Mimatic# 124632)|Y
01|123392|5|1|No quote. No repair.|Y
01|123392|5|2|Too old excessive damage. Exceeds price of new.|Y
01|123393|1|1|5pcs stock remainder ETA Pending|Y
01|123394|1|1|** Price includes motor **|Y
01|123394|2|1|46k LIST|N
01|123394|3|1|12.5k LIST|N
01|123394|7|1|76 X 26 X 2 system sub-plate|Y
01|123394|8|1|Installation includes: drive unit short bar fiber|Y
01|123394|8|2|optic cables communication cables bulk head cable|Y
01|123394|8|3|set external cable set parameter changes service|Y
01|123394|8|4|time and travel|Y
01|123395|1|1|** Price includes motor **|Y
01|123395|7|1|76 X 26 X 2 system sub-plate|Y
01|123395|8|1|Installation includes: drive unit short bar fiber|Y
01|123395|8|2|optic cables communication cables bulk head cable|Y
01|123395|8|3|set external cable set parameter changes service|Y
01|123395|8|4|time and travel|Y
01|123414|3|1|C5006-1000-4.00+W10S5-0562-1.56 assembled to make|Y
01|123414|3|2|C5005-0562-(5.56)|Y
01|123414|9|1|C50S6-1000-5.00+W1005-0875-7.83 assembled to make|Y
01|123414|9|2|C5005-0875-(7.38)|Y
01|123418|1|1|Collet is non-returnable and cancelable|Y
01|123429|1|1|**Net Price for non-standard stock|Y
01|123429|5|1|HSK100A 1.1/4 Shell Mill Holder w/ 4 (101.60mm)|Y
01|123429|5|2|projection|Y
01|123431|4|1|**NET PRICE- SPECIAL|Y
01|123439|6|1|P/N: NT05-028(S) is available for non-coolant apps|Y
01|123439|6|2|same price|Y
01|123440|2|1|BT30-FMC25.4-40|Y
01|123440|2|2|Quoted as net pricing|Y
01|123440|3|1|BT30-FMH27-60-45|Y
01|123440|3|2|Quoted as net pricing|Y
01|123440|9|1|BT30-ZH12-75|Y
01|123440|9|2|Syncronized tap holder|Y
01|123440|10|1|ZMK12-6|Y
01|123440|10|2|Tap collet|Y
01|123448|1|1|Please Note: This is for billing purposes only. Once|Y
01|123448|1|2|the (2) HSK100A-NPU13C-145 are returned from Don's|Y
01|123448|1|3|Machine we will issue credit and apply to tooling|Y
01|123448|1|4|certificate 13366-2402-082319. Please reference|Y
01|123448|1|5|Lyndex-Nikken RGA OIE-54406.|Y
01|123448|1|6|DO NOT SHIP TOOL HOLDERS!!!!!|Y
01|123458|6|1|Quoting as an in stock standard option.|Y
01|123475|1|1|Referernce RGA# QUA-54308|Y
01|123475|1|2|MNL12-ER32Z-MS s/n: A2501|Y
01|123475|1|3|(Alps# T32216)|Y
01|123475|2|1|Bearings O-rings Seals Drive Shaft Gears Collet|Y
01|123475|2|2|Nut and Bearing Nut to be replaced.|Y
01|123481|16|1|Position block made by L&N.|Y
01|123481|16|2|Spindle drawing confirmation required.|Y
01|123488|2|1|Full Set of Cables|Y
01|123488|6|1|INSTALLAITON INCLUDES INTERNAL CABLE BULKHEAD|Y
01|123488|6|2|CONNECTORS FIBRE OPTIC CABLES ADDITIONAL DRIVES|Y
01|123488|6|3|SERVO MOTORS AND WIRE HARNESS LABOR TRAVEL TRAINING.|Y
01|123496|1|1|KM1.1/4-14.3|Y
01|123496|1|2|Non-returnable non-cancelable|Y
01|123496|4|1|Non-returnable non-cancelable|Y
01|123497|1|1|** Price includes motor **|Y
01|123497|2|1|46k LIST|N
01|123497|4|1|12.5k LIST|N
01|123497|8|1|76 X 26 X 2 system sub-plate|Y
01|123497|9|1|Installation includes: drive unit short bar fiber|Y
01|123497|9|2|optic cables communication cables bulk head cable|Y
01|123497|9|3|set external cable set parameter changes service|Y
01|123497|9|4|time and travel|Y
01|123500|1|1|Delivery: 1 week (if Qty is within 10pcs)|Y
01|123506|2|1|Power and Feed back cables|Y
01|123506|4|1|Interface w/ drives will need to be installed by HFO|Y
01|123506|4|2|Lyndex Nikken Install includues parameters setting up|Y
01|123506|4|3|gridshifts installing Hyd brake|Y
01|123509|4|1|Power and Feed back cables|Y
01|123511|4|1|COST IS NET TO KEARNEY|Y
01|123511|4|2|Installation includes: Drive unit short bar fiber|Y
01|123511|4|3|optic cable communications cable bulkhead cables|Y
01|123511|4|4|external cables parameter changes service time and|Y
01|123511|4|5|travel.|Y
01|123516|1|1|Quoted as net price no returnable no cancellable|Y
01|123516|1|2|Takisawa liveIndex tang 2 flat; - D=55/ S1=59/ AF 8mm;|Y
01|123516|1|3|SK20; STR OFFSET V=82;L=107.5mm;Int/ Ext coolant|Y
01|123516|1|4|1:2 Gear; Max 20Nm; Max input 5000RPM;|Y
01|123516|1|5|Max output 10000RPM Ref drwg# 00056206|Y
01|123516|2|1|Quoted as net price no returnable no cancellable|Y
01|123516|2|2|Price for Drwg#00056206 for 5pcs|Y
01|123516|3|1|Quoted as net price no returnable no cancellable|Y
01|123516|3|2|Price for Drwg#00056206 for 10pcs|Y
01|123516|4|1|Quoted as net price no returnable no cancellable|Y
01|123516|4|2|Takisawa liveIndex tang 2 flat; - D=55/ S1=59/ AF 8mm;|Y
01|123516|4|3|SK16; STR OFFSET V=82;L=107.5mm;Int/ Ext coolant|Y
01|123516|4|4|1:2 Gear; Max 20Nm; Max Input 5000 RPM|Y
01|123516|4|5|Max Output 10000 RPM Ref drwg#00056206 but SK16 output|Y
01|123516|5|1|Quoted as net price no returnable no cancellable|Y
01|123516|5|2|Price for Drwg#00056206(but with SK16 out put)for 5pcs|Y
01|123516|6|1|Quoted as net price no returnable no cancellable|Y
01|123516|6|2|Price for Drwg#00056206(but with SK16 output)for 10pc|Y
01|123518|1|1|BT40-SK20-60|Y
01|123518|3|1|BT40-SK20-75|Y
01|123518|5|1|BT40-SK20-90|Y
01|123521|4|1|COST IS NET TO KEARNEY|Y
01|123521|4|2|Installation includes: Drive unit short bar fiber|Y
01|123521|4|3|optic cable communications cable bulkhead cables|Y
01|123521|4|4|external cables parameter changes service time and|Y
01|123521|4|5|travel.|Y
01|123523|2|1|C5066-1000-15.00  CAT50 1in End Mill Holder|Y
01|123523|2|2|15.00L 2.36L1 2.36D 3/4-16X11/16(2) G6.3 10000rpm|Y
01|123523|3|1|C5066-1250-15.00 CAT50 1.1/4 End Mill Holder|Y
01|123523|3|2|15.00L 2.55L1 2.48D 3/4-16X11/16(2) G6.3 10000rpm|Y
01|123524|1|1|Pricing only initial estimate by technician in USA.|Y
01|123524|1|2|Please see below for more notes|Y
01|123531|2|1|Power & Feedback Cables|Y
01|123531|4|1|Interface w/ drives will need to be installed by HFO|Y
01|123531|4|2|Lyndex Nikken Install includes parameterssetting up|Y
01|123531|4|3|gridshifts installing Hyd Brake|Y
01|123533|9|1|*quoted standard non-coolant|Y
01|123533|9|2|*change part# to C40S-4500(H)-EU for coolant thru|Y
01|123535|2|1|In stock version to the holder above(with longer GL)|Y
01|123545|1|1|P/N:  ISO40-ER32-70|Y
01|123545|2|1|P/N: ISO40-ER40-70|Y
01|123560|1|1|BT50-FMA25.4-250|Y
01|123562|1|1|***Min 5pc Qty Required|Y
01|123562|4|1|Qty Break Pricing|Y
01|123562|5|1|Qty Break Pricing|Y
01|123564|2|1|ADDITIONAL HOSES FOR SECOND TABLE|Y
01|123579|3|1|External Cable Set|Y
01|123581|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|123583|2|1|Non-returnable Non-cancelable|Y
01|123585|1|1|3J Collet per Winslow Automatics drawing 200-10004|Y
01|123585|1|2|Net Price Quoted|Y
01|123589|9|1|Delivery may be mid Dec if order not placed asap|Y
01|123589|9|2|If order can be placed right away to capture Mid Oct|Y
01|123589|9|3|delv we may not have to wait until December date|Y
01|123591|2|1|Installation includes: Dual axis drive short bar|Y
01|123591|2|2|fiber optic cables communications cablebulkhead cable|Y
01|123591|2|3|external cables parameter changes servie time and|Y
01|123591|2|4|travel.|Y
01|123607|2|1|ADDITIONAL HOSES FOR SECOND TABLE|Y
01|123607|5|1|INSTALL 1 CNC601T ON EACH PALLET OF TOYODA FH800SXI|Y
01|123607|5|2|INCLUDES DUAL AXIS AMP CABLE MANAGEMENT CONNECTORS|Y
01|123607|5|3|HYD UNIT INSTALL LABOR TRAVEL|Y
01|123607|5|5|!!!!!! MACHINE LADDER MUST BE CONFIRMED TO SUPPORT|Y
01|123607|5|6|ADDITIONAL AXIS!!!!!!!|Y
01|123607|5|7|IF NOT TOYODA RESPONSIBLE FOR LADDER CHANGE AND FANUC|Y
01|123607|5|8|OPTION|Y
01|123611|2|1|ADDITIONAL HOSES FOR SECOND TABLE|Y
01|123619|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|123629|3|1|HSK100A-C3/4-200G|Y
01|123629|3|2|5-9pcs Pricing|Y
01|123629|4|1|HSK100A-C3/4-200G|Y
01|123629|4|2|10+pc Pricing|Y
01|123629|7|1|HSK100A-C1-200G|Y
01|123629|7|2|5-9pcs Pricing|Y
01|123629|8|1|HSK100A-C1-200G|Y
01|123629|8|2|10+pc pricing.|Y
01|123638|2|1|Stallion Tombstone 6/6/40 - 6 Sqr. x 40 length|Y
01|123638|2|2|ground on all 4 sides. Outboard support table Riser|Y
01|123638|2|3|for Rotary Table and 1-1/4 Thick Base Plate.|Y
01|123638|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|123638|3|2|External Cables Service Time & Travel.|Y
01|123638|4|1|2.0 grid with -13 tapped holes and a .501 ID Bushing|Y
01|123638|4|2|every other hole.|Y
01|123638|4|3|There will be (54) 1/2-13 tapped holes per side and|Y
01|123638|4|4|(23) Bushed holes.|Y
01|123638|5|1|$500 Complimentary TC w/RT purchase and $500 @ 50% Disc|Y
01|123639|1|1|ref. drawing 00048663|Y
01|123639|2|1|ref. drawing 00048663|Y
01|123646|1|1|CNC180AA21 Casting replacement (w/ repaired control)|Y
01|123649|2|1|Power & Feedback cables|Y
01|123674|1|1|P&D Pending -on quote file|Y
01|123696|1|1|Note: Item is a special.  Once a PO is received the|Y
01|123696|1|2|order can not be canceled or returned.|Y
01|123708|1|1|REPAIR OF CNC180BFA S/N 10360|Y
01|123708|1|2|TAR-54321|Y
01|123716|3|1|Installation includes: drive unit short bar fiber|Y
01|123716|3|2|optic cables communication cables bulk head cable|Y
01|123716|3|3|set external cable set parameter changes service|Y
01|123716|3|4|time and travel|Y
01|123721|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|123724|3|1|Installation includes: Daul axis drive short bar|Y
01|123724|3|2|fiber optic cables communications cablesbulkhead|Y
01|123724|3|3|cables external cables parameter changes service|Y
01|123724|3|4|time and travel.|Y
01|123742|3|1|5pc MOQ required.|Y
01|123764|1|1|Reference RGA# LVR-54310|Y
01|123764|1|2|Repair of MNZ20-SK20Z-ICE-12K s/n: 89911 02|Y
01|123764|1|3|(Mimatic# 190668)|Y
01|123764|2|1|Bearings Seals O-rings coolant sealing bushing|Y
01|123764|2|2|threadring Chrome/Grind damaged spindle to be replaced|Y
01|123787|1|1|Reference RGA# LVR-54364|Y
01|123787|1|2|Repair of OKEX-ER32Z-MS s/n: AL0038|Y
01|123787|1|3|(Alps# OKA00-21001)|Y
01|123787|2|1|Bearings o-rings and 2 of collet nuts to be replaced|Y
01|123789|5|1|Quoted as an in stock option (Only 2 pcs left)|Y
01|123789|5|2|Cannot be returned.|Y
01|123791|1|1|REPAIR OF CNC180L SN: 12265|Y
01|123791|1|2|Table will not rotate by hand|Y
01|123791|1|3|TAR-54363|Y
01|123793|2|1|Installation includes: Drive unit drive card short|Y
01|123793|2|2|bar fiber optic cable communications cable|Y
01|123793|2|3|bulkhead cables external cables  parameter changes|Y
01|123793|2|4|servcie time and travel.|Y
01|123793|3|1|Installation includes: Bulkhead cables external cables|Y
01|123793|3|2|parameter changes service time and travel.|Y
01|123794|27|1|KM42-6.8|Y
01|123794|45|1|KM42-16.5|Y
01|123794|46|1|KM42-12.55|Y
01|123794|52|1|KM42-18.45|Y
01|123804|1|1|w/out coolant ports|Y
01|123804|2|1|*NEW Spec: w/ Coolant Ports ~can be plugged|Y
01|123804|5|1|w/out coolant ports|Y
01|123804|6|1|*NEW Spec: w/ Coolant Ports ~can be plugged|Y
01|123804|6|2|**21pcs will be available on 10/25|Y
01|123811|1|1|Includes motor and cable set for Haas|Y
01|123840|1|1|BT50-FMA47.625-75|Y
01|123850|1|1|No Motor - Use existing Fanuc motor|Y
01|123850|2|1|Use existing Fanuc Drive Amplifier|Y
01|123852|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|123856|3|1|Includes travel labor expenses|Y
01|123867|1|1|Reference RGA# LVR-54357|Y
01|123867|1|2|Repair of OKL3-ER32X s/n: A1017|Y
01|123867|1|3|(Alps# OK101-14000)|Y
01|123867|2|1|Bearings o-rings and collet nut to be replaced.|Y
01|123901|1|1|REPAIR OF 5AX-2MT-105-120BAYA-BR SN: 8240|Y
01|123901|1|2|TAR-54113|Y
01|123920|1|1|1pc pricing|Y
01|123920|2|1|*2pc pricing|Y
01|123945|1|1|Please note: This holder is non standard stock. Once|Y
01|123945|1|2|a purchase order is placed it cannot be cancelled or|Y
01|123945|1|3|returned.|Y
01|123953|2|1|EXTERNAL POWER AND FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|123955|2|1|EXTERNAL POWER AND FEEDBACK CABLES FOR 4TH AXIS|Y
01|123976|1|1|Reference RGA# TOR-54314|Y
01|123976|1|2|Repair of 1 x PF-1 (Discontinued item)|Y
01|123976|2|1|Labor quoted for calibration|Y
01|123990|1|1|Reference RGA# LVR-54371|Y
01|123990|1|2|Repair of OKL3-ER32Z-OFMS s/n: A177|Y
01|123990|1|3|(Alps# OK109-15001)|Y
01|123990|2|1|Bearings o-rings seal and collet nuts to be replaced.|Y
01|124008|6|1|Quoted at NET price.|Y
01|124013|2|1|Replacement for A10MM-P1.5|Y
01|124032|1|1|requested 6 we offer 5|Y
01|124032|2|1|requested 105 we offer 100|Y
01|124032|3|1|requested 85 we offer 95|Y
01|124032|4|1|requested 6 we offer 6.30|Y
01|124032|13|1|requested 6 we offer 6.30|Y
01|124041|1|1|Replacement Cable Set for CNC401 At Mears Machine|Y
01|124041|1|2|Gosiger to supply old Cables so Lyndex can make|Y
01|124045|1|1|H63A(80)-SF0625-3.375ID|Y
01|124045|1|2|Chip Hole Only/No balance screws required.|Y
01|124045|1|3|G2.5 to 15000 RPM UNV#201|Y
01|124046|1|1|H63A(80)-SF0625-3.375ID|Y
01|124046|1|2|Chip Hole Only/No balance screws required.|Y
01|124046|1|3|G2.5 to 15000 RPM UNV#201|Y
01|124052|1|1|Tool 1|Y
01|124052|2|1|Tool 1|Y
01|124052|4|1|Tool 2|Y
01|124052|5|1|Tool 2|Y
01|124052|7|1|Tool 3|Y
01|124052|8|1|Tool 3|Y
01|124052|10|1|Tool 4|Y
01|124052|11|1|Tool 4|Y
01|124052|13|1|Tool 5|Y
01|124052|14|1|Tool 5|Y
01|124052|16|1|Tool 6|Y
01|124052|17|1|Tool 6|Y
01|124052|19|1|Tool 7|Y
01|124052|20|1|Tool 7|Y
01|124052|22|1|Tool 8|Y
01|124052|23|1|Tool 8|Y
01|124052|25|1|Tool 9|Y
01|124052|26|1|Tool 9|Y
01|124052|28|1|Tool 10|Y
01|124052|29|1|Tool 10|Y
01|124052|31|1|Tool 11|Y
01|124052|32|1|Tool 11|Y
01|124052|34|1|Tool 12|Y
01|124052|35|1|Tool 12|Y
01|124052|37|1|Tool 13|Y
01|124052|38|1|Tool 13|Y
01|124052|43|1|Tool 14|Y
01|124052|44|1|Tool 14|Y
01|124052|46|1|Tool 15|Y
01|124052|47|1|Tool 15|Y
01|124052|49|1|Tool 16|Y
01|124052|50|1|Tool 16|Y
01|124052|52|1|Tool 17|Y
01|124052|53|1|Tool 17|Y
01|124052|55|1|Tool 18|Y
01|124052|56|1|Tool 18|Y
01|124052|58|1|Tool 19|Y
01|124052|59|1|Tool 19|Y
01|124052|61|1|Tool 20|Y
01|124052|62|1|Tool 20|Y
01|124052|64|1|Tool 21|Y
01|124052|65|1|Tool 21|Y
01|124052|67|1|Tool 22|Y
01|124052|68|1|Tool 22|Y
01|124052|70|1|Tool 23|Y
01|124052|71|1|Tool 23|Y
01|124052|73|1|Tool 24|Y
01|124052|74|1|Tool 24|Y
01|124052|76|1|Tool 25|Y
01|124052|77|1|Tool 25|Y
01|124052|79|1|Tool 26|Y
01|124052|80|1|Tool 26|Y
01|124052|82|1|Tool 27|Y
01|124052|83|1|Tool 27|Y
01|124052|85|1|Tool 28|Y
01|124052|86|1|Tool 28|Y
01|124052|88|1|Tool 29|Y
01|124052|89|1|Tool 29|Y
01|124052|91|1|Tool 30|Y
01|124052|92|1|Tool 30|Y
01|124052|94|1|Tool 31|Y
01|124052|95|1|Tool 31|Y
01|124052|97|1|Tool 32|Y
01|124052|98|1|Tool 32|Y
01|124052|100|1|Tool 33|Y
01|124052|101|1|Tool 33|Y
01|124052|103|1|Tool 34|Y
01|124052|105|1|Tool 35|Y
01|124052|106|1|Tool 35|Y
01|124052|108|1|Tool 36|Y
01|124052|109|1|Tool 36|Y
01|124052|111|1|Tool 37|Y
01|124052|112|1|Tool 37|Y
01|124052|114|1|Tool 38|Y
01|124052|115|1|Tool 38|Y
01|124052|117|1|Tool 39|Y
01|124052|118|1|Tool 39|Y
01|124052|120|1|Tool 40|Y
01|124052|121|1|Tool 40|Y
01|124052|123|1|Tool 41|Y
01|124052|124|1|Tool 41|Y
01|124052|126|1|Tool 42|Y
01|124052|127|1|Tool 42|Y
01|124052|129|1|Tool 43|Y
01|124052|130|1|Tool 43|Y
01|124052|131|1|Tool 44|Y
01|124052|132|1|Tool 44|Y
01|124052|134|1|Tool 45|Y
01|124052|135|1|Tool 45|Y
01|124052|137|1|Tool 46|Y
01|124052|138|1|Tool 46|Y
01|124052|140|1|Tool 47|Y
01|124052|141|1|Tool 47|Y
01|124052|143|1|Tool 48|Y
01|124052|144|1|Tool 48|Y
01|124052|146|1|Tool 49|Y
01|124052|147|1|Tool 49|Y
01|124052|151|1|.238 Flat Bottom Drill|Y
01|124052|152|1|.238 Flat Bottom Drill|Y
01|124060|1|1|C50RAM-ER25-185OTIC-110TP|Y
01|124060|1|2|CAT50 ER25 Angle Head Offset 110mm Pitch Tapered Pin|Y
01|124060|1|3|8000rpm 30Nm / With Internal Coolant|Y
01|124060|1|4|Mimatic Part #192137|Y
01|124060|1|5|Net price is based upon a purchase order of 4~6 heads.|Y
01|124073|5|1|80MM Riser Plates|Y
01|124074|3|1|Installation Includes: Drive Unit Shortbar Fiber Optic|Y
01|124074|3|2|cables communication cables bulk head cables|Y
01|124074|3|3|External Cables parameter changes service time &|Y
01|124074|3|4|travel|Y
01|124074|4|1|80 MM Riser Plate|Y
01|124080|4|1|BT50 SK25 Slim Chuck High Speed|Y
01|124101|2|1|T-SLOT FACEPLATE FOR NCT200 ROTARY TABLE|Y
01|124101|3|1|NO T-SLOT FACEPLATE FOR NCT200 ROTARY TABLE|Y
01|124101|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|124101|5|1|TRADE IN OF $2000 TO BE PASSED ALONG TO MIDSOUTH|Y
01|124101|5|2|TRADE IN TABLE:  CNC200; SN 8802|Y
01|124105|1|1|IT40-SK16-150|Y
01|124105|1|2|SK40-SK16 Slim Chuck|Y
01|124105|1|3|This is non standard stock item which is not cancelable|Y
01|124105|1|4|nor returnable once ordered|Y
01|124107|1|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|124107|1|2|Standard pitch (60)|Y
01|124107|2|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|124107|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|124115|3|1|HFO TO SUPPLY SERVO MOTORS AND CABLES LYNDEX NIKKEN TO|Y
01|124115|3|2|INSTALL|Y
01|124115|5|1|COLLET CHUCK PROMO KIT|Y
01|124115|5|2|NO CHARGE|Y
01|124116|1|1|Repair Quote for 5AX-2002 SN: 2149|Y
01|124116|1|2|RGA TAR-54312|Y
01|124123|2|1|RS232 Programming|Y
01|124123|3|1|Special cables with quick disconnect for bulkhead|Y
01|124123|4|1|Includes 4 hours of training|Y
01|124147|3|1|Installation includes: drive unit short bar fiber|Y
01|124147|3|2|optic cables communication cables bulk head cable|Y
01|124147|3|3|set external cable set parameter changes service|Y
01|124147|3|4|time and travel|Y
01|124147|7|1|Installation includes: drive unit short bar fiber|Y
01|124147|7|2|optic cables communication cables bulk head cable|Y
01|124147|7|3|set external cable set parameter changes service|Y
01|124147|7|4|time and travel|Y
01|124150|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|124150|2|1|M3HZ-25V|Y
01|124150|2|2|ZMAC Boring Unit|Y
01|124152|1|1|HSK63A-SK10C-105P has SKN-10K(GH) removed and|Y
01|124152|1|2|SKN-10BJ(GH) installed on to holder.|Y
01|124152|3|1|HSK63A-SK16C-120P has SKN-16b(GH) removed and|Y
01|124152|3|2|SKN-16BJ(GH) installed on holder.|Y
01|124174|2|1|Alternative in stock to 6|Y
01|124174|5|1|Alternative in stock to 4|Y
01|124179|2|1|Swap out E16-NUT for E16-NUT-HEX nut|Y
01|124179|2|2|5-7 day lead time|Y
01|124190|1|1|NK103-11000 is 3600RPM this item has discontinued|Y
01|124190|1|2|Consider using NK103-13000 X-Axis 6000RPM ER25|Y
01|124212|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|124212|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|124212|5|1|** Closeout Promotion! All sales are FINAL!**|Y
01|124214|1|1|Please Note: Stock at Les Outils >>Serial #58084|Y
01|124214|3|1|Please Note: Stock at Les Outils|Y
01|124214|10|1|Please Note: Stock at Les Outils|Y
01|124214|11|1|Please Note: Stock at Les Outils|Y
01|124232|1|1|171059|Y
01|124232|4|1|162911|Y
01|124235|2|1|With 5C Step Collet Closer|Y
01|124241|1|1|Ref. Mimatic# 188042|Y
01|124241|1|2|IntC Coolant (1000 PSI)  Max 6500rpm Max Torque 25Nm|Y
01|124241|2|1|Ref. Mimatic# 107446|Y
01|124241|3|1|Ref. Mimatic# 107613|Y
01|124241|3|2|Nut wrench for SK20 collet nut|Y
01|124246|1|1|RFQ # 313528|Y
01|124257|1|1|QUOTE REPAIR FOR CNCZ105L SN: 2137|Y
01|124257|1|2|REF TAR-54451|Y
01|124258|4|1|Custom Positioning Block for DMG DMC 125 FD|Y
01|124268|1|1|CAT50-ZH12CH-80 Synchronized Tap Holder|Y
01|124268|1|2|With Fine Floating Uses ZMK12 Tap Collets|Y
01|124270|2|1|Discounted Installation by Lyndex Nikken.|Y
01|124270|2|2|Lyndex Nikken to provide Interface Kit and prove out on|Y
01|124270|2|3|First MaxMill Project- Price includes Travel and|Y
01|124279|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|124280|1|1|Reference RGA# TOR-54274|Y
01|124280|1|2|Repair of 1 x CAT40-UMT200U|Y
01|124280|4|1|Calibration included|Y
01|124286|1|1|Includes Motors & Cable Set for P300MA Control|Y
01|124286|1|2|CONFIRMATION WITH SCHUNK REGARDING WORKHOLDING|Y
01|124286|5|1|$1000.00 Complimentary Tooling Certificate per table|Y
01|124289|6|1|1) PRICES ARE FOB TRUCK MUNDELEIN IL|Y
01|124289|6|2|2) PRICES INCLUDE 6 HOURS OF TRAINING AND INSTALLATION|Y
01|124295|1|1|Reference RGA# TOR-54360|Y
01|124295|1|2|Repair of HSK63A-C1.1/4-100|Y
01|124302|1|1|Standard Holder 1:1 Ratio ( X AXIS )|Y
01|124302|3|1|Standard Holder 1:1 Ratio ( Z AXIS )|Y
01|124307|1|1|P/N: S13-BCBX14.5-75 Special 13mm Straight Shank Ext|Y
01|124307|1|2|ZMAC Boring Bar   L=75mm M=45mm|Y
01|124308|1|1|Quick Change System|Y
01|124308|2|1|Top Right on Page 13 of brochure|Y
01|124308|3|1|Top Left page 13 on brochure|Y
01|124308|4|1|Middle Left on page 13 of Brochure|Y
01|124308|5|1|Middle Left on page 13 brochure|Y
01|124308|6|1|M12 Tap Holder|Y
01|124308|7|1|The $700.00 is Net Price|Y
01|124310|1|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|124310|1|2|ETA is after receipt of order/approval drawing signed|Y
01|124310|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|124310|2|2|ETA is after receipt of order/approval drawing signed|Y
01|124310|4|1|MZMP47-MI50X-OFS|Y
01|124310|4|2|ETA pending receipt of order/approval drawing signed|Y
01|124310|4|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|124310|5|1|MZMP47-MI50Z-SUB|Y
01|124310|5|2|ETA pending receipt of order/approval drawing signed|Y
01|124310|5|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|124311|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|124312|1|1|Reference RGA# TOR-54447|Y
01|124312|1|2|Repair of NCAT40-C1.1/4SL-105U-IDU|Y
01|124313|1|1|**Consignment Tool - s/n# 6038003**|Y
01|124313|1|2|**Using 2015 LIST pricing**|Y
01|124315|1|1|Reference RGA# TOR-54054|Y
01|124315|1|2|Repair of CAT40-C1.1/4-85U-IDU (Tool#1)|Y
01|124315|7|1|Repair of CAT40-C1.1/4-85U-IDU (Tool#2)|Y
01|124315|12|1|Labor for Tool#1 & Tool#2.|Y
01|124316|1|1|Quoted Net Price.|Y
01|124320|1|1|Reference RGA# LVR-54388|Y
01|124320|1|2|Repair of MZQT5-ER32Z-MS-C-3MP s/n: 97881 01|Y
01|124320|1|3|(Mimatic# 182142)|Y
01|124320|2|1|Bearings seals o-rings crashed spindle busing and|Y
01|124320|2|2|ID plate to be replaced.|Y
01|124321|2|1|External cable set|Y
01|124321|3|1|Includes drive unit machine side cables travel|Y
01|124321|3|2|labor expenses|Y
01|124322|2|1|External cable set|Y
01|124322|4|1|Includes drive unit machine side cables travel|Y
01|124322|4|2|labor expenses|Y
01|124341|1|1|One time discount for use at trade show.Non returnable|Y
01|124355|1|1|MCT45-42  Quick change type multilock milling chuck|Y
01|124355|11|1|FT45-4   Quick change type face mill arbor|Y
01|124355|12|1|FT45-5   Quick change type face mill arbor|Y
01|124355|13|1|FT45-6   Quick change type face mill arbor|Y
01|124357|1|1|7.072.330|Y
01|124357|3|1|7.074.070|Y
01|124360|1|1|MZQT47-ER16X-OFF-HS3|Y
01|124365|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|124367|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|124369|2|1|Complete Installation - Lyndex Nikken.|Y
01|124369|2|2|Texmac will need to supply data sheets for the machine|Y
01|124369|2|3|Texmac will hold responsibility for 5 Axis Verification|Y
01|124369|2|4|Lyndex Nikken will not be held responsible for 5 Axis|Y
01|124369|2|5|Verification|Y
01|124369|2|6|Lyndex Nikken Offers a $1000.00 LN Tooling Cert with PO|Y
01|124369|2|7|Tooling Cert - No Charge|Y
01|124370|3|1|Complete Installation - Lyndex Nikken|Y
01|124370|3|2|Texmac will need to supply data sheets for the machine|Y
01|124370|3|3|Texmac will hold responsibility for 5 Axis Verification|Y
01|124370|3|4|Lyndex Nikken will not be held responsible for 5 Axis|Y
01|124370|3|5|Verification|Y
01|124370|3|6|Lyndex Nikken Offers a $1000.00 LN Tooling Cert with PO|Y
01|124370|3|7|Tooliong Cert - No Charge|Y
01|124376|5|1|Please Note; Discount is based upon complete order.|Y
01|124377|3|1|Includes: external cables interface cables short bar|Y
01|124377|3|2|communciations cable fiber optic cable drive unit|Y
01|124377|3|3|travel labor expenses|Y
01|124382|1|1|Non-returnablenon-cancelable|Y
01|124382|2|1|Ship Direct from Japan|Y
01|124382|2|2|(2) day freight|Y
01|124386|3|1|Replacement for part C5005-0562-5.02|Y
01|124391|6|1|BMT45-ER16X-MD BMT45 Live ER16 STRT 1:1 X-Axis<RADIAL>|Y
01|124391|6|2|Ext Coolant 6500rpm 50Nm|Y
01|124391|6|3|Net price based upon 3-pcs order.|Y
01|124399|1|1|(1) PC pricing|Y
01|124399|2|1|(2) PC pricing|Y
01|124406|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|124416|1|1|Parts# CAT40-HC12-150|Y
01|124416|1|2|Special Order. Unit price each.|Y
01|124416|2|1|Parts# CAT40-HC20-150|Y
01|124416|2|2|Special Order. Unit price each.|Y
01|124434|2|1|THIS TABLE IS AIR ONLY|Y
01|124434|3|1|THIS TABLE CAN BE USED WITH AIR OR HYUDRAULIC|Y
01|124434|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|124437|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|124437|7|1|HYDRAULIC MANIFOLD PRESSURE REGULATOR FOR AIR/HYD|Y
01|124441|1|1|TABLE WITH SERVO MOTOR ONLY|Y
01|124441|1|2|LYNDEX NOT RESPONSIBLE FOR INSTALL|Y
01|124441|2|1|ADDITIONAL HOSES FOR SECOND TABLE|Y
01|124441|3|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|124455|2|1|Promo Pricing ** Regular list price $338 offer $271***|Y
01|124455|5|1|***3.50 G.L. Discontinued*** Option 3.94 G.L.***|Y
01|124455|6|1|***3.50 G.L. Discontinued*** Option 3.15 G.L.***|Y
01|124470|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|124470|7|1|TOOLING CERTIFICATE FOR CUSTOMER AT NO COST|Y
01|124492|1|1|*External coolant|Y
01|124492|5|1|*Internal coolant and can run dry|Y
01|124496|1|1|TC#25000-2354-062019RT|Y
01|124496|2|1|TC#25000-2355-062019RT|Y
01|124538|1|2|10.23 Diameter x 14.17 Length|Y
01|124538|2|1|14.17 Diameter x 18.1 Length|Y
01|124539|10|1|PRESETTER TO BE CONSIGNED TO YAMAZEN FOR 6 MONTH|Y
01|124539|10|2|PERIOD. FOR DEMOS AND CUSTOMER VISITS IN YAMAZEN|Y
01|124539|10|3|SHOWROOM. STEVE BOND TO PICK UP AT CUSTOMER|Y
01|124545|1|1|Ref Drwg#TCA-37097/7|Y
01|124569|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|124575|2|1|HSK63F-SK16-105P|Y
01|124575|2|2|HSK63F SK16 Slim Chuck High Speed Coolant MaxRPM 30K|Y
01|124604|10|1|*Offer in 4 instead of 3|Y
01|124609|1|1|Tooling Certificate Number: 8115-2461-101619|Y
01|124610|1|1|Motor is included in price!|Y
01|124610|2|1|Full set of Cables.|Y
01|124633|2|1|Swing Box       Unit Price Each.|Y
01|124635|3|1|Power and Feed back Cables|Y
01|124635|4|1|Interface w/ drives will need to be installed by HFO|Y
01|124635|4|2|Lyndex Nikken install includes parameters setting up|Y
01|124635|4|3|gridshifts installing Hyd Brake|Y
01|124637|3|1|Please note delivery date is from the receipt of|Y
01|124637|3|2|signed approval drawings.|Y
01|124642|3|1|Offered as an in stock option|Y
01|124642|6|1|Offered as an almost in stock option|Y
01|124644|1|1|Price is for a set of 3 pcs|Y
01|124645|10|1|In stock alternative to C5001-27-60CP|Y
01|124645|22|1|alternative in stock to C5017-0032-6.00|Y
01|124670|1|1|Includes (2)CAT50 Chuck Holders|Y
01|124671|1|1|Would need to make a Riser to get to 170mm Center Ht.|Y
01|124673|2|1|ADDITIONAL HOSES FOR SECOND TABLE|Y
01|124715|8|1|This item is considered special once it's ordered it|Y
01|124715|8|2|cannot be cancelled or returned.|Y
01|124722|1|1|CHS-1.6 Collet|Y
01|124722|2|1|CHS-3.0 Collet|Y
01|124733|1|1|Fuji Live; BMT30; SK16; 90DEG; [Single Spindle]|Y
01|124733|1|2|L1=130mm; L2=30mm;|Y
01|124733|1|3|1:1 Gear; reversal output; max 6500 RPM; max 20Nm;|Y
01|124733|1|4|Int/ Ext/ ICE coolant 1015 PSI|Y
01|124733|1|5|Special Order. Unit Price Each.|Y
01|124733|2|1|Fuji Live; BMT30; SK16; 90DEG;  [Sual Spindle]|Y
01|124733|2|2|L1=130mm; L2=30mm; Pitched distance A=81mm;|Y
01|124733|2|3|1:1 Gear; reversal output; max 6500 RPM;|Y
01|124733|2|4|max 15Nm per spindle;|Y
01|124733|2|5|Int/ Ext/ ICE coolant 1015 PSI|Y
01|124733|2|6|Special Order. Unit Price Each.|Y
01|124743|1|1|Please Note: Collet is non standard stock. Once a|Y
01|124743|1|2|purchase order is placed it cannot be cancelled|Y
01|124743|1|3|or returned.|Y
01|124744|1|1|**NET PRICE|Y
01|124758|3|1|P/N CNCZ100-3W-120SA-BR2|Y
01|124758|4|1|5C Dead Length Collet Chuck - P/N Q39277-1|Y
01|124758|4|2|**For use with Nikken pancake cylinder|Y
01|124758|5|1|Aluminum Manifold & Plumbing|Y
01|124758|12|1|5C Dead Length Collet Chuck - P/N Q39277-1|Y
01|124758|12|2|**For use with Nikken pancake cylinder|Y
01|124758|13|1|Aluminum Manifold & Plumbing|Y
01|124764|3|1|Schunk vise + jaws + adapter plate|Y
01|124781|5|1|Lyndex-Nikken to make PB.|Y
01|124781|5|2|Delivery is based on receipt of spindle drawing|Y
01|124781|5|3|*Net price|Y
01|124785|6|1|Please note: This tool is 6000 RPM. Please make|Y
01|124785|6|2|sure customer is aware of this. We do not sell 10000|Y
01|124785|6|3|rpm with a main sub.|Y
01|124799|6|1|EXTERNAL CABLE SET BOTH AXIS|Y
01|124799|12|1|NIKKEN SK COLLET CHUCK WITH MITSUBISHI ENDMILLS|Y
01|124801|1|1|CLUTCH KIT FOR OKL4-ER40X _ REF LIVE # OK102-18000|Y
01|124807|3|1|TRIDENT TO SUPPLY HAAS MOTOR AND CABLES FOR LYNDEX TO|Y
01|124807|3|2|INSTALL|Y
01|124811|2|1|Balanced and Pre-balanced.|Y
01|124811|2|2|Unit has tapped holes on flange for added feature|Y
01|124811|2|3|should customer want to use on balance machine.|Y
01|124814|1|1|Repair of CNC202 Rotary Table|Y
01|124814|1|2|Customer will bring table in for repair|Y
01|124814|1|3|L/N to do training side by side during repair|Y
01|124814|1|4|Pricing includes parts/labor/training|Y
01|124814|1|5|Customer responsible for travel and meal expenses|Y
01|124821|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|124821|3|2|External Cables Service Time & Travel.|Y
01|124822|1|1|Repair of 5AX-2MT S/N: 8101|Y
01|124822|1|2|Below is list of parts and labor required|Y
01|124822|46|1|Cable # TCE-96543|Y
01|124822|47|1|Cable # TCE-94905|Y
01|124835|4|1|Currently only CCW units in stock|N
01|124849|2|1|Coolant Ports onlyMOD charge based on QTY should QTY|Y
01|124849|2|2|change MOD charge may change|Y
01|124849|2|3|NET charge|Y
01|124849|4|1|Coolant Ports onlyMOD charge based on QTY should QTY|Y
01|124849|4|2|change MOD charge may change|Y
01|124849|4|3|NET charge|Y
01|124849|6|1|Coolant Ports onlyMOD charge based on QTY should QTY|Y
01|124849|6|2|change MOD charge may change|Y
01|124849|6|3|NET charge|Y
01|124864|1|1|Square cut o-ring 10.82 X 14.18 X 1.68 N90|Y
01|124864|1|2|FOR NEW MIMATIC LIVE MNL12 AFTER MAY 2017|N
01|124864|1|3|DKAR00013-N90|Y
01|124864|2|1|Square cut o-ring 17.17 X 20.53 X 1.68 N90|Y
01|124864|2|2|FOR OLD MIMATIC LIVE MNL12 BEFORE MAY 2017|N
01|124864|2|3|DKAR00017-N90|Y
01|124881|1|1|Replaces A10MM-P1.5|Y
01|124881|2|1|Replaces A12MM-P1.75|Y
01|124881|3|1|Replaces A16MM-P2|Y
01|124901|1|1|HSK63A-SK10C-105P has SKN-10K(GH) removed and|Y
01|124901|1|2|SKN-10BJ(GH) installed on to holder.|Y
01|124901|3|1|HSK63A-SK16C-120P has SKN-16b(GH) removed and|Y
01|124901|3|2|SKN-16BJ(GH) installed on holder.|Y
01|124905|1|1|Holder is non-refundable|Y
01|124905|4|1|Shorter Gage Line Avilable only one holder offered|Y
01|124905|4|2|at discounted price|Y
01|124906|1|1|Quoted at Net pricing.|Y
01|124909|1|1|Reference RGA# LVR-54408|Y
01|124909|1|2|OKL3-ER32X s/n: AL789 (Alps# OK101-14000)|Y
01|124909|2|1|Bearings o-rings collet nut gears spindle and small|Y
01|124909|2|2|parts. This is locked however if the gears and spindle|Y
01|124909|2|3|are good enough to use the cost will be $1001.16 (|Y
01|124909|2|4|after the 10% discount)|Y
01|124909|4|1|OKL3-ER32X s/n: AL1218 (Alps# OK101-14000)|Y
01|124909|5|1|Bearings o-rings collet nut gears spindle and small|Y
01|124909|5|2|parts. This is locked however if the gears and spindle|Y
01|124909|5|3|are good enough to use the cost will be $ 1001.06 (|Y
01|124909|5|4|after the 10% discount).|Y
01|124909|7|1|OKL3-ER32X s/n: AL1219 (Alps# OK101-14000)|Y
01|124909|8|1|Bearings o-rings collet nut gears spindle and small|Y
01|124909|8|2|parts. This is locked however if the gears and spindle|Y
01|124909|8|3|are good enough to use the cost will be $ 1001.06 (|Y
01|124909|8|4|after the 10% discount).|Y
01|124909|10|1|OKL3-ER32Z-OFMS s/n: AL180 (Alps# OK109-15001)|Y
01|124909|11|1|Bearings o-rings collet nuts and small parts|Y
01|124909|13|1|OKL3-ER32Z-OFMS s/n: Unknown (Alps# OK109-15001)|Y
01|124909|14|1|Bearings o-rings collet nuts spindle shaft and small|Y
01|124909|14|2|parts.|Y
01|124909|16|1|OKL3-ER32Z-OFMS s/n: AL192 (Alps# OK109-15001)|Y
01|124909|17|1|Bearings o-rings collet nuts and small parts|Y
01|124929|1|1|P/N: TT35-MT2 Quick Change type Morse Taper Sleeve|Y
01|124952|1|1|3.93 Gauge Length|Y
01|124952|2|1|1.18 Gauge Length|Y
01|124954|47|1|New Rotary Motor Cover|Y
01|124954|48|1|New Tilt Axis Motor Cover|Y
01|124972|2|1|NCM-8.0 Reamer Morse Taper Shank|Y
01|124981|22|1|HSK50A-SK13-90P|Y
01|124981|23|1|HSK50A-SK13-105P|Y
01|124992|1|1|Pricing based on (5) pcs|Y
01|124992|1|2|BMT65-ER32-30FA-ICE|Y
01|124992|1|3|HAAS LIVE: BMT65: ER32:FIXED ANGLE: 30 DEG FIXED AH|Y
01|124992|1|4|L=130mm:Int/Ext coolant 1015 PSI:1:1 Gear: Max 6000 RPM|Y
01|124992|1|5|30Nm: REf drwg#00056209|Y
01|124992|1|6|ETA after receipt of order/approval drawing signed|Y
01|124992|1|7|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|124993|1|1|REPAIR QUOTE FOR CNC321LFA SN: 5231|Y
01|124993|1|2|Table needs full rebuild|Y
01|124993|24|1|New Internal Cable Set|Y
01|125003|3|1|5+pcs pricing*|Y
01|125004|1|1|Delivery for 3 pc = 5 weeks|Y
01|125004|1|2|Delivery for balance of 2pcs = 8 weeks|Y
01|125009|4|1|C5005-0562-5.02 discontinued**|Y
01|125009|5|1|*C5005-0875-5.66 discontinued**|Y
01|125009|6|1|*C5005-1375-7.72 discontinued**|Y
01|125009|7|1|*old part# C5017-0016-6.00|Y
01|125009|53|1|*old part# NC5021-1250-6.00|Y
01|125009|53|2|**New standard w/ coolant ports|Y
01|125009|55|1|*old part# NC5031-1000-8.00|Y
01|125009|55|2|**New standard w/ coolant ports|Y
01|125024|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|125024|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|125028|1|1|ZKG12-1/4S Tap collet  6.3 x 5|Y
01|125045|6|1|EXTERNAL CABLE SET BOTH AXIS|Y
01|125045|12|1|NIKKEN SK COLLET CHUCK WITH MITSUBISHI ENDMILLS|Y
01|125053|1|1|PRICE INCLUDES CT200R030 FACE PLATE|Y
01|125053|4|1|HEIDENHAIN SCALE KIT MODIFICATION AND INSTALL|Y
01|125053|5|1|Installation includes: Drive unit short bar fiber|Y
01|125053|5|2|optic cable communications cable bulkhead cables|Y
01|125053|5|3|external cables parameter changes service time and|Y
01|125053|5|4|travel.|Y
01|125073|30|1|for 11SR collet chucks|Y
01|125073|31|1|for 16SR collet chucks|Y
01|125073|32|1|for 20SR collet chucks|Y
01|125076|1|1|Quoted at Net Price|Y
01|125088|1|1|Repair Quote for 5AX-2002 SN: 1199|Y
01|125088|1|2|Rotary Body Sent in - Un-Repairable due to casting|Y
01|125088|1|3|Damage.  Below is replacement Body|Y
01|125088|2|1|New Rotary Body|Y
01|125088|2|2|Includes: New Casting/Worm Wheel/Screw/Bearings/Seals|Y
01|125094|1|1|Reference RGA# TOR-54538|Y
01|125094|1|2|Repair of SF-START2-UNIT-200 s/n: 2J327|Y
01|125102|1|1|Please Note: New gage length is 6.77|Y
01|125102|2|1|This item is needed to adapt tool to NMTB50.|Y
01|125109|1|1|Used|Y
01|125132|14|1|offered 5 length as an in stock option.|Y
01|125136|1|1|Installed w/ PS-N46E at factory|Y
01|125136|2|1|Installed on NC5-46-C25-90 at factory|Y
01|125140|3|1|Sub for HSK63A-0500-4.00|Y
01|125140|15|1|Quoted Net price|Y
01|125147|1|1|Repair of CNC180LFA SN 14249N|Y
01|125147|29|1|New Direct Mount Cable Set|Y
01|125157|1|1|Ship with PS-N46E installed at the factory|Y
01|125157|2|1|Installed on NC5-46-SK10C-90 at the factory|Y
01|125157|3|1|Ship with PS-N46E installed at the factory|Y
01|125157|4|1|Installed on NC5-46-C25-90 at the factory|Y
01|125160|1|1|Installed w/chip BIS-C-122-04/L|Y
01|125160|1|2|NET price includes MOD charge Chip and discount|Y
01|125162|1|1|H63A-SF0500-5.12CP 1/2 Shrink Fit Holder Pre-Balanced|Y
01|125162|1|2|Coolant Ports|Y
01|125162|3|1|H63A-SF0500-5.12 1/2 Shrink Fit Holder Pre-Balanced|Y
01|125197|1|1|HSK63F-C1-100G-DP With Makino Pins|Y
01|125216|2|1|For 5Ax-201|Y
01|125234|1|1|G55-4D O ring|Y
01|125242|14|1|Position block made by L&N.|Y
01|125242|14|2|Spindle drawing confirmation required.|Y
01|125247|1|1|Quoted at Net Price|Y
01|125247|2|1|16-BCB-38-55|Y
01|125247|2|2|Quoted at Net Price|Y
01|125268|1|1|Part Number SA4080-ER32Z-100RH-HS2-ICE|Y
01|125268|1|2|SAUTER LIVE VDI40 DIN5480; ER32; 90DEG; RH;|Y
01|125268|1|3|L1=100mm; 1:2 Gear; Max 25Nm;Max input 6500 RPM|Y
01|125268|1|4|Max output 13000 RPM;Int/ Ext coolant 1015 PSI|Y
01|125268|1|5|REF DRWG# 00056316 / Mimatic #195564|Y
01|125268|3|1|Part Number SA4080-ER25Z-100RH-HS2-ICE|Y
01|125268|3|2|SAUTER LIVE VDI40 DIN5480; ER25; 90DEG; RH;|Y
01|125268|3|3|L1=100mm; 1:2 Gear; Max 25Nm;Max input 6500 RPM|Y
01|125268|3|4|Max output 13000 RPM;Int/ Ext coolant 1015 PSI|Y
01|125268|3|5|REF DRWG# 00056320 / Mimatic Part # 195566|Y
01|125268|5|1|Part Number SA4080-ER32Z-100RH-ICE|Y
01|125268|5|2|SAUTER LIVE VDI40 DIN5480; ER32; 90DEG; RH:L1=100mm;|Y
01|125268|5|3|1:1 Gear; Max 70Nm;Max 7000 RPM;|Y
01|125268|5|4|Int/ Ext coolant 1015 PSI|Y
01|125268|5|5|REF DRWG# 00017311 / Mimatic Part #133780|Y
01|125283|2|1|Modification is a NET price charge|Y
01|125283|2|2|Allow 2-3 weeks for est availabilit to ship|Y
01|125283|2|3|If needed sooner we can inquire about expediting|Y
01|125288|1|1|Replacement Table for SN: 1199|Y
01|125288|1|2|Delivery currently TBD|Y
01|125289|2|1|Installation includes:Drive unit short bar fiber|Y
01|125289|2|2|optic cable communications cable bulkhead cables|Y
01|125289|2|3|external cables parameter changes service time and|Y
01|125289|2|4|travel.|Y
01|125307|1|1|BT50 22mm Face / Shell Mill Holder 75MM GL|Y
01|125307|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125307|2|1|BT50 22mm Face / Shell Mill Holder 120MM GL|Y
01|125307|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125307|3|1|BT50 32mm Face / Shell Mill Holder 45MM GL|Y
01|125307|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125307|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125313|1|1|MZQT5-ER25-AD-ICE|Y
01|125313|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125313|1|3|(3) PC pricing|Y
01|125315|2|1|1 full set of cables|Y
01|125315|3|1|Inculdes labor travel training and install.|Y
01|125317|1|1|This is for Lyndex-Nikken tool holder only.|Y
01|125317|9|1|*std CAT40|Y
01|125323|1|1|*** NOT STOCK MUST CONFIRM PRICE & DELIVERY ***|Y
01|125352|1|1|Non-returnablenon-cancelable|Y
01|125370|4|1|Installation includes: Drive unit short bar fiber|Y
01|125370|4|2|optic cable communications cable bulkhead cables|Y
01|125370|4|3|external cables parameter changes service time and|Y
01|125370|4|4|travel.|Y
01|125381|1|1|Currently 6 pcs are availablemore are ETA 12/2 week|Y
01|125388|4|1|VMK16-1/4|Y
01|125393|4|1|Stop Block for Bost VTL|Y
01|125393|4|2|Quoted at Net Price|Y
01|125393|5|1|Stop Block for Mazak 650 Multitask Mill Head|Y
01|125393|5|2|Quoted at Net Price|Y
01|125409|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125409|2|1|34-ZMAC70-70V|Y
01|125409|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125409|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125409|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125413|1|1|Reference RGA# LVR-54523|Y
01|125413|1|2|OKL3-ER32Z-OFMS s/n: TBD|Y
01|125413|1|3|(Alps# OK109-15001)|Y
01|125413|2|1|Bearings O-rings Oil Seals and Collet Nuts to be|Y
01|125413|2|2|replaced.|Y
01|125420|1|1|Reference RGA# LVR-54492|Y
01|125420|1|2|Repair of MNZ20-ER25Z-MS s/n: A0008|Y
01|125420|1|3|(Alps# T32276)|Y
01|125420|2|1|Bearings O-Rings Oil Seals Drive Shaft Bearing Nuts|Y
01|125420|2|2|and Collet Nuts to be replaced.|Y
01|125423|1|1|Used Discount|Y
01|125423|2|1|Used Discount|Y
01|125435|11|1|w/ coolant ports|Y
01|125440|2|1|Offered as an in stock option|Y
01|125470|3|1|This item is considered special once ordered it can't|Y
01|125470|3|2|be cancelled or returned|Y
01|125480|2|1|Customer will choose either or depending on if they can|Y
01|125480|2|2|wait or not|Y
01|125492|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|125492|4|2|External Cables Service Time & Travel.|Y
01|125504|2|1|EXTERNAL CABLE SET|Y
01|125504|3|1|NET PRICE TO MORRIS|Y
01|125506|1|1|Non-returnable non-cancelable|Y
01|125507|1|1|Non-returnablenon-cancelable|Y
01|125508|1|1|Non-returnablenon-cancelable|Y
01|125518|3|2|23.66 Faceplate|Y
01|125518|9|1|INSTALLATION COST IS ESTIMATE. CONFIRMATION WITH|Y
01|125518|9|2|NOMURA IF ADDITIONAL AXIS CAN BE ADDED WITHOUT LADDER|Y
01|125518|9|3|CHANGE. FMT TO CONFIRM MACHINE BUILDER|Y
01|125518|9|4|ABOVE INSTALLATION IS ONLY ESTIMATE. NO WORKHOLDING|Y
01|125518|9|5|ABOVE INSTALLATION INCLUDES ADDITIONAL DRIVE SERVO|Y
01|125518|9|6|MOTOR FIBRE OPTICS CONNECTORSINNER CABLE HARNESS|Y
01|125518|9|7|TRAVEL AND LABOR|Y
01|125518|9|8|MACHINE NOMURA HBA-110 TR3 DISCUSSED WITH BILL CAMLOH|Y
01|125518|9|9|WITH NOMURA|Y
01|125522|3|1|Installation includes: Parameter changes service time|Y
01|125522|3|2|and travel.|Y
01|125527|1|1|Non-returnablenon-cancelable|Y
01|125528|1|1|Ref. Qt 327417|Y
01|125536|3|1|Installation includes: Drive unit short bar fiber|Y
01|125536|3|2|optic cables bulkhead cables external cables|Y
01|125536|3|3|parameter changes service time and travel.|Y
01|125546|1|1|Customer to provide motor and cable set from old table|Y
01|125548|2|1|OKUMA MOTOR FOR CNC260 WITH OSP4|Y
01|125548|3|1|GEAR FOR CNC260 OKUMA OSP4 TABLE|Y
01|125548|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS (2 SETS)|Y
01|125548|7|1|INSTALLATION FEE INCLUDES: LABOR TRAVEL EXPENSES FOR|Y
01|125548|7|2|LYNDEX NIKKEN SERVICE TECHNICIAN. ALSO INCLUDES:|Y
01|125548|7|3|DRIVE SERVO AMPLIFIER BULKHEAD CONNECTORS/WIRING.|Y
01|125560|1|1|Non standard stock specialmay not be cancelled or|Y
01|125560|1|2|returned once ordered|Y
01|125569|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|125569|7|1|TOOLING CERTIFICATE FOR CUSTOMER AT NO COST|Y
01|125575|4|1|Delivery is based upon receipt of purchase order.|Y
01|125575|4|2|Tim Reeves will work with end user to make the special|Y
01|125575|4|3|block.|Y
01|125575|9|1|Delivery is based upon receipt of purchase order.|Y
01|125575|9|2|Tim Reeves will work with end user to make the special|Y
01|125575|9|3|block.|Y
01|125575|14|1|Delivery is based upon receipt of purchase order.|Y
01|125575|14|2|Tim Reeves will work with end user to make the special|Y
01|125575|14|3|block.|Y
01|125575|16|1|BT40 AGH; ER25 A=65mm; L=232mm; L1=80mm;|Y
01|125575|16|2|L2=24mm; L3=63.6mm; (drwg#00056348) 1:1 Gear Ratio:|Y
01|125575|16|3|max 15Nm; 10000RPM: Ref drwg # 00053648+00022536|Y
01|125575|16|4|Quoted at NET Price|Y
01|125575|17|1|BT40 AGH; ER25 A=65mm; L=232mm; L1=80mm;|Y
01|125575|17|2|L2=24mm; L3=63.6mm; (drwg#00056348) 1:1 Gear Ratio:|Y
01|125575|17|3|max 15Nm; 10000RPM: Ref drwg # 00053648+00022536|Y
01|125575|17|4|Quoted at NET Price|Y
01|125575|18|1|BT40 AGH; ER25 A=65mm; L=232mm; L1=80mm;|Y
01|125575|18|2|L2=24mm; L3=63.6mm; (drwg#00056348) 1:1 Gear Ratio:|Y
01|125575|18|3|max 15Nm; 10000RPM: Ref drwg # 00053648+00022536|Y
01|125575|18|4|Quoted at NET Price|Y
01|125578|1|1|10 ROTARY TABLE FOR KIRA (FANUC CONTROL MACHINE)|Y
01|125578|2|1|10 ROTARY TABLE FOR OKUMA M560|Y
01|125578|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS (2 SETS)|Y
01|125578|4|1|INSTALLATION FOR KIRA VMC: INCLUDES DRIVE SERVO|Y
01|125578|4|2|AMPLIFER BULKHEAD CONNECTORS AND CABLING PLUS|Y
01|125578|4|3|TRAVEL EXPENSES FOR LYNDEX NIKKEN SERVICE TECH|Y
01|125581|5|1|PRESETTER INSTALLATION & 2 DAYS OF TRAINING|Y
01|125581|5|2|ALSO HELP SETTING UP NETWORKING TO TRANSMIT NC FILES|Y
01|125581|5|3|TO PG'S COMPUTER THEN TO THE CONTROLS OF THE MACHINES|Y
01|125583|1|1|Prices quoted above include training & installation|Y
01|125583|1|2|of 8 hours.  once invoice these items may not be|Y
01|125583|1|3|returned. Terms are FOB Mundelein by air ride truck.|Y
01|125587|1|1|N5006-0500A-5.75-ID-GKN|Y
01|125587|1|2|NMTB50 1/2 End Mill Holder Aerospace GKN UNV#11|Y
01|125587|1|3|With ID Chip Hole|Y
01|125588|1|1|N5006-0500A-5.75-ID-GKN|Y
01|125588|1|2|NMTB50 1/2 End Mill Holder Aerospace GKN UNV#11|Y
01|125588|1|3|With ID Chip Hole|Y
01|125607|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|125609|21|1|Replaces C5017-1000-5.50|Y
01|125609|46|1|Replaces SKN-10B|Y
01|125609|47|1|Replaces SKN-10B(GH)|Y
01|125613|1|1|1 DEGREE INDEXER WITH HIRTH COUPLING|Y
01|125613|1|2|CONFIRMATION OF MACHINE DATA SHEETS WILL BE NEEDED|Y
01|125613|1|3|CONFIRMATION OF PROPER FIT TO MACHINE|Y
01|125613|1|4|LADDER MAY NEED TO BE CHANGED DUE TO 1 DEGREE INDEXING|Y
01|125613|1|5|(360 POSITIONS)|Y
01|125613|2|1|HYD. SOURCE NEEDED FOR BRAKE SYSTEM|Y
01|125613|4|1|EXTERNAL CABLE SET|Y
01|125622|1|1|Please see attached drawing MZMP47-ER32X-OFS|Y
01|125622|2|1|PLEASE SEE ATTACHED DRAWING : MZMP47-ER32Z-SUB|Y
01|125650|7|1|*non-coolant|Y
01|125655|1|1|Tooling Certificate Number: 10119-2476-110419|Y
01|125656|3|1|Please Note: CCW= Reverse Direction Program must be|Y
01|125656|3|2|set up from Counter Clockwise to Clockwise|Y
01|125656|3|3|Discount is based on non returnable tooling. Warranty|Y
01|125656|3|4|of parts & labor 1-year.|Y
01|125662|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|125662|4|2|External Cables Service Time & Travel.|Y
01|125676|6|1|ZQ35-16|Y
01|125676|6|2|QC35 Tap Holder Z16 Non-Stop Chuck|Y
01|125688|4|1|Installation includes: Drive unit short bar fiber|Y
01|125688|4|2|optic cables communications cables bulkhead cables|Y
01|125688|4|3|external cables parameter changes servcie time and|Y
01|125688|4|4|travel.|Y
01|125694|1|1|Includes: (2) NCTZ200E Rotary Tables Junction Box|Y
01|125694|1|2|External/Interface Cables Amplifier(s) B-Axis Cable|Y
01|125704|2|1|4 PORT ROTARY JOINT FOR CNC260|Y
01|125705|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|125705|3|2|External Cables Service Time & Travel.|Y
01|125714|2|1|CAN BE PNUEMATIC OR HYDRAULIC|Y
01|125714|3|1|HYDRAULIC PUMP WILL BE NEEDED FOR THIS TABLE.|Y
01|125714|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|125714|12|1|MANUAL TAILSTOCK FOR CNC302|Y
01|125714|13|1|MANUAL TAILSTOCK FOR CNC321|Y
01|125714|14|1|AIR/HYDRAULIC TAILSTOCK FOR CNC302|Y
01|125714|15|1|HYDRAULIC TAILSTOCK FOR CNC302|Y
01|125714|16|1|HYDRAULIC TAILSTOCK FOR CNC321|Y
01|125714|19|1|INSTALLATION INCLUDES: TRAVEL/LODGING FOR LYNDEX|Y
01|125714|19|2|SERVICE TECHNICIAN 4TH AXIS DRIVE BULKHEAD CABLING|Y
01|125714|19|3|CONNECTORS.|Y
01|125715|1|1|60% Discount Applied for a replacement tool that is|Y
01|125715|1|2|out of warranty. Please pass a 50% discount to the End|Y
01|125715|1|3|User.|Y
01|125716|1|1|Swap std nut to coolant nut SKN-20B --> SKN-20BJ|Y
01|125718|1|1|Z-axis: 23.62|Y
01|125758|1|1|Mimatic Part # 195630 >> L-N #NT55-ER25X-OFF-ICE-HS2|Y
01|125758|1|2|NAKAMURA LIVE; BMT55; ER25; HIGHSPEED GEAR;|Y
01|125758|1|3|OFFSET V=50mm 1:2 GEAR; MAX 40Nm: MAX INPUT 5750 RPM;|Y
01|125758|1|4|MAX OUTPUT 11500 RPM: INT/ EXT COOLANT 1015PSI|Y
01|125758|1|5|REF DRWG # 00056367|Y
01|125758|3|1|Mimatic Part # 195630 >> L-N #NT55-ER25X-OFF-ICE-HS2|Y
01|125758|3|2|NAKAMURA LIVE; BMT55; ER25; HIGHSPEED GEAR;|Y
01|125758|3|3|OFFSET V=50mm 1:2 GEAR; MAX 40Nm: MAX INPUT 5750 RPM;|Y
01|125758|3|4|MAX OUTPUT 11500 RPM: INT/ EXT COOLANT 1015PSI|Y
01|125758|3|5|REF DRWG # 00056367|Y
01|125758|5|1|Mimatic Part # 195630 >> L-N #NT55-ER25X-OFF-ICE-HS2|Y
01|125758|5|2|NAKAMURA LIVE; BMT55; ER25; HIGHSPEED GEAR;|Y
01|125758|5|3|OFFSET V=50mm 1:2 GEAR; MAX 40Nm: MAX INPUT 5750 RPM|Y
01|125758|5|4|MAX OUTPUT 11500 RPM: INT/ EXT COOLANT 1015PSI|Y
01|125758|5|5|REF DRWG # 00056367|Y
01|125819|1|1|Reference RGA# TOR-54474|Y
01|125819|1|2|Repair of PF-2|Y
01|125819|3|1|Calibration service included.|Y
01|125820|1|1|*stand is included with presetter|Y
01|125820|1|2|*Z-Axis: 23.62|Y
01|125822|1|1|Lead time is subject to prior sale|Y
01|125872|2|1|ICE - Internal Coolant and can run dry|Y
01|125872|5|1|for OKL3-ER32X|Y
01|125872|6|1|for OKL3-ER32X|Y
01|125872|8|1|for OKL3-ER32Z-ICE & OKL3-ER32X-ICE|Y
01|125872|9|1|for OKL3-ER32Z-ICE & OKL3-ER32X-ICE|Y
01|125879|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125879|1|2|ETA is pending receipt of order/signed drawing|Y
01|125879|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|125879|2|2|ETA is pending receipt of order/signed drawing|Y
01|125885|1|1|Quoted as an in stock alt for ER32|Y
01|125900|1|1|Repair of CNC200 SN 8819|Y
01|125900|1|2|TAR-54542|Y
01|125909|1|1|MRAM-ER25 Bottom Attachement|Y
01|125909|1|2|Item is in WH2 (used) - only cosmetic due to trade show|Y
01|125909|1|3|Selling with Warranty|Y
01|125909|1|4|Customer has to return MI40 attachment as well|Y
01|125914|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|125914|4|1|** Closeout Promotion! All sales are FINAL!**|Y
01|125925|2|1|to hold 3/32|Y
01|125925|4|1|to hold 7/64|Y
01|125925|8|1|to hold 3/32 in BT30-SK10 collet chuck|Y
01|125925|9|1|to hold 5/32|Y
01|125938|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|125970|1|1|Prices quoted above include training & installation|Y
01|125970|1|2|of 8 hours.  once invoice these items may not be|Y
01|125970|1|3|returned. Terms are FOB Mundelein by air ride truck.|Y
01|125989|1|1|16i/18i/21i/30i/31i/32i BOTH AXIS|Y
01|125998|1|1|Includes: (1) Union Screw M10x1 (1) Double Bevel Ring|Y
01|125998|1|2|6mm Dia (1) Pipe @ 50 deg bend|Y
01|126005|1|1|Non-returnablenon-cancelable|Y
01|126008|1|1|*Wait for standard to arrive end of Dec|Y
01|126008|1|2|OR  L&N will plug DIN holes to make this part#|Y
01|126008|1|3|with 1 day delivery|Y
01|126008|3|1|**Sell AS-IN DIN - Coolant Thru Flange|Y
01|126015|3|1|10+pc pricing|Y
01|126028|4|1|NIKKEN SK COLLET CHUCK KIT AT NO CHARGE|Y
01|126043|1|2|P/N 5AX-130SA3|Y
01|126045|1|1|Price includes ID chip hole but no chip|Y
01|126045|2|1|Price includes chip hole and chip installed|Y
01|126062|5|1|J-Nuts needed for nut swap|Y
01|126071|1|1|16i/18i/21i/30i/31i/32i BOTH AXIS|Y
01|126073|1|1|16i/18i/21i/30i/31i/32i BOTH AXIS|Y
01|126073|1|2|Price includes: Removal of all hardware from existing|Y
01|126073|1|3|two NV5000 machines resetting factory parameters.|Y
01|126073|1|4|Reinstalling the hardware on to two other existing|Y
01|126073|1|5|NV5000 machines and changing required parameters.|Y
01|126079|1|1|Mimatic Part#195371|Y
01|126079|1|2|4 PC Pricing|Y
01|126079|1|3|HSK63A; AGH; PolyMill P16 interface;|Y
01|126079|1|4|Coolant intake from center;|Y
01|126079|1|5|External coolant through pipe nozzle;|Y
01|126079|1|6|L1=196.5mm; Width 14.7mm;1:4.96 Gear ratio; max 3Nm;|Y
01|126079|1|7|Max input 1915 RPM;Max output 9500 RPM;|Y
01|126079|1|8|Ref drwg# 00056141|Y
01|126079|1|9|Quoted as NET pricingnonreturnablenon-cancelable|Y
01|126079|1|10|ETA Pending receipt of order/approval drawing signed|Y
01|126079|2|1|Mimatic Part#195371|Y
01|126079|2|2|Same description as Line#1 but(8) PC Pricing|Y
01|126079|2|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|2|4|ETA Pending receipt of order/approval drawing signed|Y
01|126079|3|1|Mimatic Part#195371|Y
01|126079|3|2|Same description as line # 1&2 but (12) PC pricing|Y
01|126079|3|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|3|4|ETA Pending receipt of order/approval drawing signed|Y
01|126079|6|1|Mimatic Part#195656|Y
01|126079|6|2|4 PC Pricing|Y
01|126079|6|3|HSK63A; AGH; Beretta cutter FD 6mm dia arbor;|Y
01|126079|6|4|Coolant intake from center;|Y
01|126079|6|5|External coolant through pipe nozzle;|Y
01|126079|6|6|L1=196.5mm; Width 14.7mm;|Y
01|126079|6|7|1:4.96 Gear ratio; max 3Nm;|Y
01|126079|6|8|Max input 1915 RPM;Max output 9500 RPM;|Y
01|126079|6|9|Ref drwg# 00056368|Y
01|126079|6|10|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|7|1|Mimatic Part#195656|Y
01|126079|7|2|Same description as line#4 but(8)PC Pricing|Y
01|126079|7|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|7|4|ETA Pending receipt of order/approval drawing signed|Y
01|126079|8|1|Mimatic Part#195656|Y
01|126079|8|2|Same description as line#4&5 but (12)PC pricing|Y
01|126079|8|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|8|4|ETA Pending receipt of order/approval drawing signed|Y
01|126079|12|1|Mimatic Part#195657|Y
01|126079|12|2|4 PC Pricing|Y
01|126079|12|3|BT40; AGH; PolyMill P16 interface;|Y
01|126079|12|4|L1=199.5mm; width 14.7mm;|Y
01|126079|12|5|Coolant intake from positioning pin|Y
01|126079|12|6|external coolant through pipe nozzle;|Y
01|126079|12|7|1:4.96 Gear ratio; max 3Nm;|Y
01|126079|12|8|Max input 1915 RPM;Max output 9500 RPM;|Y
01|126079|12|9|Ref drwg# 00056380|Y
01|126079|12|10|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|13|1|Mimatic Part#195657|Y
01|126079|13|2|Same description as line#7 but (8) PC Pricing|Y
01|126079|13|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|13|4|ETA Pending receipt of order/approval drawing signed|Y
01|126079|14|1|Mimatic Part#195657|Y
01|126079|14|2|Same description as line#7&8 but(12) PC pricing|Y
01|126079|14|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|14|4|ETA Pending receipt of order/approval drawing signed|Y
01|126079|17|1|Mimatic Part#195659|Y
01|126079|17|2|4 PC Pricing|Y
01|126079|17|3|BT40; AGH; Beretta cutter FD 6mm dia arbor;|Y
01|126079|17|4|L1=199.5mm; width 14.7mm;|Y
01|126079|17|5|Coolant intake from positioning pin|Y
01|126079|17|6|external coolant through pipe nozzle;|Y
01|126079|17|7|1:4.96 Gear ratio; max 3Nm;|Y
01|126079|17|8|Max input 1915 RPM;Max output 9500 RPM;|Y
01|126079|17|9|Ref drwg# 00056384|Y
01|126079|17|10|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|18|1|Mimatic Part#195659|Y
01|126079|18|2|Same description as Line#10 but (8) PC Pricing|Y
01|126079|18|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|18|4|ETA Pending receipt of order/approval drawing signed|Y
01|126079|27|1|Mimatic Part#195659|Y
01|126079|27|2|Same description as Line#10&11 but (12) PC pricing|Y
01|126079|27|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126079|27|4|ETA Pending receipt of order/approval drawing signed|Y
01|126080|3|1|KSP-160 CHuck and adapter kit.|Y
01|126081|2|1|Hose Solenoid Manifold Pressure switch Fittings are|Y
01|126081|2|2|included|Y
01|126081|3|1|Installation includes entering Rotary table parameters|Y
01|126081|3|2|set up Lyndex hydraulic pump & hoses|Y
01|126081|3|3|Rotary table cable management|Y
01|126081|3|4|Checking the table accuracy|Y
01|126081|3|5|(note) we don't lift and place the table on the machine|Y
01|126081|5|1|Scales for 4th and 5th axis|Y
01|126081|5|2|includes Scale Scale monunt kit Cover and int wiring|Y
01|126081|6|1|Riser Plates to bring up rotary axis to mount scale|Y
01|126081|7|1|Air freight cost|Y
01|126091|2|1|RT-CN260SD-10+1-L|Y
01|126091|2|2|10+1 Rotary Joint        CYLINDER TYPE|Y
01|126091|3|1|CST101-135-RJ1|Y
01|126091|3|2|Support Table with 1 Port Rotary Joint.|Y
01|126102|1|1|TAT-170(4+1 RJ)|Y
01|126102|1|2|Shipping from Japan will be via Boat (Ocean)|Y
01|126102|1|3|Current delivery subject to change|Y
01|126102|1|4|Special model no cancelation no refund upon PO|Y
01|126102|1|5|Showing NET PRICE|Y
01|126102|1|6|Not include cables|Y
01|126113|11|1|Includes: drive unit external cables interface cables|Y
01|126113|11|2|communication cables fiber optic cable short bar|Y
01|126113|11|3|travel labor expenses|Y
01|126115|1|1|TABLE INCLUDES SERVO MOTOR. M AT END OF PART NUMBER|Y
01|126115|1|2|SIGNIFIES MOTOR INCLUDED.|Y
01|126115|4|1|includes: Drive unit short bar fiber optic cables|Y
01|126115|4|2|bulkhead cables external cablesparameter changes|Y
01|126115|4|3|service time and travel.|Y
01|126115|4|4|Machine must have ladder for the additional 1 axis|Y
01|126130|2|1|(3) or more PC pricing|Y
01|126130|4|1|(3) or more PC pricing|Y
01|126135|2|1|6MP-T8(NS9530) Insert Boring Bar (10pc Set)|Y
01|126142|1|1|1 piece ETA 11/19  Balance of 2 pieces ETA 1/15/20|Y
01|126147|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|126152|4|1|Modification of face plate|Y
01|126160|1|1|Offering a one time extra discount|Y
01|126160|2|1|Offering a one time extra discount|Y
01|126163|1|1|Mimatic Part#195371|Y
01|126163|1|2|4 PC Pricing|Y
01|126163|1|3|HSK63A; AGH; PolyMill P16 interface;|Y
01|126163|1|4|Coolant intake from center;|Y
01|126163|1|5|External coolant through pipe nozzle;|Y
01|126163|1|6|L1=196.5mm; Width 14.7mm;1:4.96 Gear ratio; max 3Nm;|Y
01|126163|1|7|Max input 1915 RPM;Max output 9500 RPM;|Y
01|126163|1|8|Ref drwg# 00056141|Y
01|126163|1|9|Quoted as NET pricingnonreturnablenon-cancelable|Y
01|126163|1|10|ETA Pending receipt of order/approval drawing signed|Y
01|126163|2|1|Mimatic Part#195371|Y
01|126163|2|2|Same description as Line#1 but(8) PC Pricing|Y
01|126163|2|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|2|4|ETA Pending receipt of order/approval drawing signed|Y
01|126163|3|1|Mimatic Part#195371|Y
01|126163|3|2|Same description as line # 1&2 but (12) PC pricing|Y
01|126163|3|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|3|4|ETA Pending receipt of order/approval drawing signed|Y
01|126163|6|1|Mimatic Part#195656|Y
01|126163|6|2|4 PC Pricing|Y
01|126163|6|3|HSK63A; AGH; Beretta cutter FD 6mm dia arbor;|Y
01|126163|6|4|Coolant intake from center;|Y
01|126163|6|5|External coolant through pipe nozzle;|Y
01|126163|6|6|L1=196.5mm; Width 14.7mm;|Y
01|126163|6|7|1:4.96 Gear ratio; max 3Nm;|Y
01|126163|6|8|Max input 1915 RPM;Max output 9500 RPM;|Y
01|126163|6|9|Ref drwg# 00056368|Y
01|126163|6|10|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|7|1|Mimatic Part#195656|Y
01|126163|7|2|Same description as line#4 but(8)PC Pricing|Y
01|126163|7|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|7|4|ETA Pending receipt of order/approval drawing signed|Y
01|126163|8|1|Mimatic Part#195656|Y
01|126163|8|2|Same description as line#4&5 but (12)PC pricing|Y
01|126163|8|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|8|4|ETA Pending receipt of order/approval drawing signed|Y
01|126163|12|1|Mimatic Part#195657|Y
01|126163|12|2|4 PC Pricing|Y
01|126163|12|3|BT40; AGH; PolyMill P16 interface;|Y
01|126163|12|4|L1=199.5mm; width 14.7mm;|Y
01|126163|12|5|Coolant intake from positioning pin|Y
01|126163|12|6|external coolant through pipe nozzle;|Y
01|126163|12|7|1:4.96 Gear ratio; max 3Nm;|Y
01|126163|12|8|Max input 1915 RPM;Max output 9500 RPM;|Y
01|126163|12|9|Ref drwg# 00056380|Y
01|126163|12|10|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|13|1|Mimatic Part#195657|Y
01|126163|13|2|Same description as line#7 but (8) PC Pricing|Y
01|126163|13|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|13|4|ETA Pending receipt of order/approval drawing signed|Y
01|126163|14|1|Mimatic Part#195657|Y
01|126163|14|2|Same description as line#7&8 but(12) PC pricing|Y
01|126163|14|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|14|4|ETA Pending receipt of order/approval drawing signed|Y
01|126163|17|1|Mimatic Part#195659|Y
01|126163|17|2|4 PC Pricing|Y
01|126163|17|3|BT40; AGH; Beretta cutter FD 6mm dia arbor;|Y
01|126163|17|4|L1=199.5mm; width 14.7mm;|Y
01|126163|17|5|Coolant intake from positioning pin|Y
01|126163|17|6|external coolant through pipe nozzle;|Y
01|126163|17|7|1:4.96 Gear ratio; max 3Nm;|Y
01|126163|17|8|Max input 1915 RPM;Max output 9500 RPM;|Y
01|126163|17|9|Ref drwg# 00056384|Y
01|126163|17|10|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|18|1|Mimatic Part#195659|Y
01|126163|18|2|Same description as Line#10 but (8) PC Pricing|Y
01|126163|18|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|18|4|ETA Pending receipt of order/approval drawing signed|Y
01|126163|27|1|Mimatic Part#195659|Y
01|126163|27|2|Same description as Line#10&11 but (12) PC pricing|Y
01|126163|27|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126163|27|4|ETA Pending receipt of order/approval drawing signed|Y
01|126166|2|1|Offered as an in stock alternative.|Y
01|126170|1|1|TABLE INCLUDES SERVO MOTOR. M AT END OF PART NUMBER|Y
01|126170|1|2|SIGNIFIES MOTOR INCLUDED.|Y
01|126170|4|1|includes:  short bar fiber optic cables|Y
01|126170|4|2|bulkhead cables external cablesparameter changes|Y
01|126170|4|3|service time and travel.|Y
01|126170|4|4|Machine must have ladder for the additional 1 axis|Y
01|126170|4|5|KITAMURA TO SUPPLY DRIVE UNIT|Y
01|126170|4|10|ALLPRICES ABOVE REFLECT 1 TABLE INSTALLED PER MACHINE|Y
01|126175|1|1|Tool Certificate amount to be determined|Y
01|126188|2|1|Note: Item is non-standard stock. Once a PO is received|Y
01|126188|2|2|it can not be canceled or returned.|Y
01|126193|1|1|Repair of Rotary Table 5AX-201 SN 4316|Y
01|126193|1|2|Below is repair items and also other items to|Y
01|126193|1|3|be complete working rotary table for Brother Machine|Y
01|126194|1|1|B4007-0040-8.00 BT40 ER40 Collet Chuck W/8 Gage Lgth.|Y
01|126200|2|1|Note: Not for Erickson Quick Change|Y
01|126204|1|1|Tool Certificate 13687-2359-062419|Y
01|126212|3|1|Heidenhain Scale Kit|Y
01|126212|3|2|HEIDENHAIN-RCN2390F + Scale Mount Kit|Y
01|126212|4|1|Chuck Adpter Plate Cylinder Adapter Plate and|Y
01|126212|4|2|Connected Rod are Included.|Y
01|126214|1|1|*Projection 40mm|Y
01|126215|4|1|19.5mm Hi-Speed Nikken Style wrench|Y
01|126228|4|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|126228|5|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|126228|6|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|126243|1|1|Reference RGA# TOR-54435|Y
01|126243|1|2|Repair of Tool#2 HSK100A-C1-135|Y
01|126243|1|3|Tool#1 is unrepairable.|Y
01|126264|1|1|Reference RGA# LVR-53545|Y
01|126264|1|2|MNL12-ER32Z-MS s/n: A1987|Y
01|126264|1|3|(Alps# T32216B03)|Y
01|126264|2|1|Bearings O-Rings Oil Seals Bearing Nut Collet Nuts|Y
01|126264|2|2|and spindle shafts to be replaced.|Y
01|126276|2|1|- PTS should issue us a consignment PO with the price|Y
01|126276|2|2|of items.|Y
01|126276|2|3|- If there is no consignment PO we can not provide|Y
01|126276|2|4|any items for test cut.|Y
01|126276|2|5|- Max duration for the test cut is 2 months.|Y
01|126276|2|6|- All of items we provided should be either purchased|Y
01|126276|2|7|by customer or returned to us with test report after|Y
01|126276|2|8|the test cut period.|Y
01|126276|2|9|- Any missing items or damaged items must be paid|Y
01|126276|2|10|by customer or PTS|Y
01|126282|12|1|Sub for NB3007-0025-2.00|Y
01|126293|1|1|Quoted Net Price.|Y
01|126305|1|1|*Projection 40mm|Y
01|126308|2|1|Quoted at Net Price|Y
01|126308|3|1|Lyndex-Nikken MI63-SM31.75 /Mimatic #181627|Y
01|126308|3|2|1.250 pilot Shell Mill Adapter Quick Change|Y
01|126309|2|1|Installation includes: Bulkhead cables external cables|Y
01|126309|2|2|parameter changes service time and travel.|Y
01|126309|5|1|Installation includes: Bulkhead cablesexternal cables|Y
01|126309|5|2|parameter changes service time and travel.|Y
01|126312|3|1|Sizes will vary|Y
01|126319|6|1|Once stock is gone use new part#C5007-0020.4.00|Y
01|126319|7|1|Reference old p/n C5017-0020-4.00|Y
01|126319|11|1|Reference old p/n C50SF-0125-3.15|Y
01|126319|13|1|cross from Nikken PS-16|Y
01|126324|2|1|ADDITIONAL HOSES FOR SECOND TABLE|Y
01|126324|5|1|INSTALL 1 CNC601T ON PALLET OF TOYODA FA800S|Y
01|126324|5|2|INCLUDES SINGLE AXIS DRIVE INSTALL PARAMETERSINSTALL|Y
01|126324|5|3|HYD UNITINSTALL TABLE ON PALLET TRAVEL LABOR|Y
01|126324|5|4|!!!!!! MACHINE LADDER MUST BE CONFIRMED TO SUPPORT|Y
01|126324|5|5|ADDITIONAL AXIS!!!!!!!|Y
01|126324|5|6|IF NOT TOYODA RESPONSIBLE FOR LADDER CHANGE AND FANUC|Y
01|126324|5|7|OPTION|Y
01|126327|1|1|Repair of 5AX-130ZA SN: 4226|Y
01|126327|1|2|Both Axis's need to be repaired.|Y
01|126327|1|3|Below are labor and parts required to be repaired.|Y
01|126329|12|1|MPK4-3/64|Y
01|126329|12|2|Item is a specialnot cancelable nor returnable|Y
01|126329|12|3|Item is at NET price|Y
01|126329|13|1|MPK4-5/64|Y
01|126329|13|2|Item is a special and is non cancelable nor returnable|Y
01|126329|13|3|Item is at NET price|Y
01|126329|14|1|MPK4-7/64|Y
01|126329|14|2|Item is a special and is non cancelable nor returnable|Y
01|126329|14|3|Item is at NET price|Y
01|126329|15|1|MPK4-9/64|Y
01|126329|15|2|Item is a special and is not cancelable or returnable|Y
01|126329|15|3|Item is at NET price|Y
01|126329|16|1|MPK4-5/32|Y
01|126329|16|2|Item is a special and is non cancelable nor returnable|Y
01|126329|16|3|Item is at NET price|Y
01|126353|4|1|This part# will replace part# above when stock runs out|Y
01|126353|7|1|This part# will replace part# above when stock runs out|Y
01|126353|9|1|This part# will replace part# above when stock runs out|Y
01|126367|1|1|Nikken NCS-6.02 Straight Shank Reamer|Y
01|126367|2|1|Nikken NCS-6.02 Straight Shank Reamer|Y
01|126367|4|1|Nikken NCS-10.03 Straight Shank Reamer|Y
01|126367|5|1|Nikken NCS-10.03 Straight Shank Reamer|Y
01|126367|7|1|Nikken NCS-12.03 Straight Shank Reamer|Y
01|126367|8|1|Nikken NCS-12.03 Straight Shank Reamer|Y
01|126368|1|1|Nikken NCS-8.02 Straight Shank Reamer|Y
01|126368|2|1|Nikken NCS-8.02 Straight Shank Reamer|Y
01|126388|2|1|cross from Fitz-Rite 50RK-138-30|Y
01|126389|2|1|P/N: CAT50-AF1-50-OH  CAT50 Main Body|Y
01|126389|3|1|P/N: BF150-33-75-70C  ARBOR for above|Y
01|126389|4|1|P/N: 9BF150-33-75-70C-I  BYTE for above|Y
01|126389|4|2|MOQ:3 pieces|Y
01|126389|5|1|P/N: AFC-27  INSERT for above|Y
01|126389|5|2|MOQ: 10 pieces|Y
01|126391|4|1|This item is considered special and if ordered it|Y
01|126391|4|2|cannot be cancelled or returned.|Y
01|126394|2|1|Replaces SKN-6WBJ(GH)|Y
01|126395|2|1|P/N: CAT50-AF2-60-OH  CAT50 Main Body|Y
01|126395|3|1|P/N: BF260-80-105-250C  ARBOR for above|Y
01|126395|4|1|P/N: 9BF260-80-105-250C-I  BYTE for above|Y
01|126395|4|2|MOQ:3 pieces|Y
01|126395|5|1|P/N: AFC-35  INSERT for above|Y
01|126395|5|2|MOQ: 10 pieces|Y
01|126398|1|1|Table to be setup for Robodrill|Y
01|126398|2|1|External Cable Set|Y
01|126398|2|2|Blum to provide wiring diagram to confirm that standard|Y
01|126398|2|3|Lyndex-Nikken standard wiring will work.|Y
01|126398|3|1|Installation of 5AX-130 onto Fanuc Robodrill|Y
01|126398|3|2|Includes:  Parameter Changes + External Cables (Above)|Y
01|126398|3|3|Blum to provide interface cables + drive + Options|Y
01|126419|15|1|1 available alternative to C40R5-0562-2.87(C)|Y
01|126434|32|1|Will have pluggable coolant ports|Y
01|126434|33|1|Will have pluggable coolant ports|Y
01|126434|34|1|Will have pluggable coolant ports|Y
01|126434|35|1|Will have pluggable coolant ports|Y
01|126434|42|1|** Closeout Promotion! All sales are FINAL!**|Y
01|126434|43|1|** Closeout Promotion! All sales are FINAL!**|Y
01|126440|1|1|Note: Item is non-standard stock special.  Once a PO|Y
01|126440|1|2|is received it can not be cancelled or returned.|Y
01|126442|1|1|DEMO PRESETTER PRICING|Y
01|126442|7|1|TRADE IN VALUE FOR 2001 ELBO CONTROLLI PRESETTER|Y
01|126446|1|1|NEW IN BOX PRESETTER PRICING; NOT DEMO UNIT|Y
01|126446|7|1|TRADE IN VALUE FOR 2001 MODEL ELBO PRESETTER|Y
01|126451|1|1|Please Note: Presetter comes with vacuum clamping.|Y
01|126452|2|1|Rebalance Chip BIS-C-122-04/L & Chip Install|Y
01|126455|1|1|This unit has Mechanical Clamping.|Y
01|126463|1|1|Repair of 5AX-130ZA SN: 4226|Y
01|126463|1|2|Both Axis's need to be repaired.|Y
01|126463|1|3|Below are labor and parts required to be repaired.|Y
01|126475|1|1|4TH AND 5TH AXIS INSTALLATION NEEDED|Y
01|126475|3|1|EXTERNAL CABLES SET FOR 2 AXIS|Y
01|126475|5|1|FULL 4TH AND 5TH AXIS INSTALLTION. 4+ 1|Y
01|126475|5|2|INCLUDES DUAL AXIS DRIVE OPTIC CABLES INTERNAL CABLES|Y
01|126475|5|3|ALL CONNECTORS HARDWARE TRAVEL AND LABOR|Y
01|126475|5|4|MACHINE DATA SHEETS REQUIRED. CONFIRMATION OF MACHINE|Y
01|126475|5|5|LADDER TO SUPPORT ADDITION AXIS|Y
01|126475|5|6|ADDITIONAL AXIS PARAMETERS REQUIRED FROM FANUC|Y
01|126475|5|8|CONFIRMATION OF MODEL MACHINE NEEDED. ABOVE FOR FANUC|Y
01|126475|5|9|DRIVEN MACHINE|Y
01|126476|1|1|Non-returnable non-cancelable|Y
01|126476|2|1|Non-returnablenon-cancelable|Y
01|126477|1|1|PS-S50|Y
01|126477|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|126483|3|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|126495|2|1|AC5-ABSB101-522LO|Y
01|126495|2|2|Price is a NET price|Y
01|126495|3|1|AC5-ABSB101-522RO|Y
01|126495|3|2|Price is a NET price|Y
01|126495|4|1|AC5-TC50|Y
01|126495|4|2|Price is a NET price|Y
01|126535|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|126542|1|1|Repair/Diagnose of CNCZ321 SN 10005 CNC321 SN 13308|Y
01|126542|1|2|Customer states that getting alarms for braking|Y
01|126542|1|3|and that boosters are leaking|Y
01|126542|3|1|Basic Expenses|Y
01|126549|1|1|RFQ #332568|Y
01|126552|1|1|ETA 1st Week of January|Y
01|126552|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXE|Y
01|126552|3|1|INCLUDES BULKHEAD CONNECTORS FIBRE OPTICS DUAL|Y
01|126552|3|2|ADDITIONAL DRIVES SERVO MOTORS AND WIRE HARNESS. LABOR|Y
01|126552|3|3|TRAVEL TRAINING.|Y
01|126568|2|1|Installation includes: Drive unit short bar fiber|Y
01|126568|2|2|optic cable communications cable bulkhead cables|Y
01|126568|2|3|external cables parameter changes service time and|Y
01|126568|2|4|travel.|Y
01|126568|5|1|with face plate|Y
01|126575|5|1|Installation includes: Drive unit short barfiber|Y
01|126575|5|2|optic cable communications cable bulkhead cables|Y
01|126575|5|3|external cables parameter changes service time and|Y
01|126575|5|4|travel.|Y
01|126586|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXE|Y
01|126586|3|1|INCLUDES BULKHEAD CONNECTORS FIBRE OPTICS DUAL|Y
01|126586|3|2|ADDITIONAL DRIVES SERVO MOTORS AND WIRE HARNESS. LABOR|Y
01|126586|3|3|TRAVEL TRAINING.|Y
01|126590|1|1|Reference RGA# TOR-54466|Y
01|126590|1|2|Repair of PF-2 (Tool#1)|Y
01|126590|5|1|Calibration service included.|Y
01|126590|7|1|Repair of PF-2 (Tool#2)|Y
01|126590|11|1|Calibration service included|Y
01|126592|1|1|Tooling Certificate Number: 13687-2371-071119|Y
01|126598|3|1|Block made by Lyndex Nikken spindle drawing|Y
01|126598|3|2|confirmation required|Y
01|126598|3|3|Quoted as NET pricing|Y
01|126598|9|1|Block made by Lyndex Nikken spindle drawing|Y
01|126598|9|2|confirmation required|Y
01|126598|9|3|Quoted as NET pricing|Y
01|126598|15|1|Block made by Lyndex Nikken spindle drawing|Y
01|126598|15|2|confirmation required|Y
01|126598|15|3|NET pricing|Y
01|126614|1|1|0.748D 0.590D1 0.793L1 1.029L2 75a 0.236W 5/8-11UNC|Y
01|126614|1|2|Coolant thru|Y
01|126622|1|1|Repair of 5AX-130ZA SN: 1699|Y
01|126622|1|2|Both Axis's need to be repaired.|Y
01|126622|1|3|Below are labor and parts required to be repaired.|Y
01|126623|2|1|Worm Wheel|Y
01|126623|5|1|PLEASE NOTE: Need exact measure the diamete of the|Y
01|126623|5|2|existing needle bearing(1-2pcs).|Y
01|126627|13|1|***1pc 1-2WKS Bal 3-4WK***|Y
01|126644|9|1|Replaces part#SK10-05s|Y
01|126644|15|1|replaces part number SK25-08S|Y
01|126645|1|1|Master Jaw replacement for Howa H037M6 N-1351|Y
01|126645|1|2|1 set/3 pcs (Item sold as set)|Y
01|126651|2|1|Installation includes: Bulkhead cables exteranl cables|Y
01|126651|2|2|parameter changes service time and travel.|Y
01|126659|3|1|Minimum Order 5-Pieces Required|Y
01|126659|6|1|Minimum Order 5-Pieces Required|Y
01|126659|8|1|Minimum Order 5-Pieces Required|Y
01|126659|10|1|Minimum Order 5-Pieces Required|Y
01|126666|1|1|1pc availbal 16 weeks|Y
01|126666|2|1|1pc availbal 16 weeks|Y
01|126673|1|1|Reference RGA# QUA-54565|Y
01|126673|1|2|Repair of MZMP47-ER32Z-HSC s/n: 18901366 03|Y
01|126673|1|3|(Mimatic# 124916)|Y
01|126673|2|1|Bearings seals and o-rings to be replaced.|Y
01|126673|2|2|Resurface spindles as needed.|Y
01|126674|1|1|Hardinge CAT40 Coolant Through|Y
01|126674|2|1|Okuma CAT40 Coolant Through|Y
01|126677|2|1|Convert (2)CNCZ180's from a Brother Machine to a new|Y
01|126677|2|2|machine with Fanuc Control.|Y
01|126677|4|1|Includes Rotarty Table Installation (2)Servo Amps|Y
01|126677|4|2|Bulkhead Cables External Cables Parameter Changes|Y
01|126677|4|3|Service Time and Travel.|Y
01|126681|1|1|HFO TO PROVIDE LYNDEX NIKKEN MOTOR AND CABLES|Y
01|126681|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|126682|4|1|NO CHARGE|Y
01|126682|5|1|NO CHARGE|Y
01|126683|2|1|Speed Grip ID Collet Chuck with Radial Part Locator and|Y
01|126683|2|2|Hydraulic Clamp with Spring Release per DWG# #19-62929|Y
01|126683|3|1|Hydraulic Manifold Plumbing and Actuation Lever|Y
01|126683|4|1|Aluminum adapter plates for Rotary to Machine Table|Y
01|126683|6|1|Includes Installation Drive Units Bulkhead Cables|Y
01|126683|6|2|External Cables Service Time & Travel.|Y
01|126683|6|3|*Estimate pending the Machines Cable Management options|Y
01|126687|1|1|quoted as in stock alternative to line 2|Y
01|126694|1|1|Used demo table with special pricing|Y
01|126701|1|1|600MM rotary table with control box for M-code usage.|Y
01|126731|1|1|ETA 12/1|Y
01|126744|2|1|Customer needs to identify machine and make|Y
01|126785|1|1|Replacement part # for C40-TESTBAR-14.00|Y
01|126795|1|1|Reference RGA# LVR-54578|Y
01|126795|1|2|Repair of MNL12-ER25X-OFF-HS-ICE s/n: 88533 03|Y
01|126795|1|3|(Mimatic# 189424)|Y
01|126795|2|1|Bearings seals and o-rings to be replaced.|Y
01|126807|4|1|Includes: SK20-1/83/161/45/163/87/161/29/165/8|Y
01|126807|4|2|and 3/4|Y
01|126849|5|1|This item is discontinued and cannot be returned.|Y
01|126851|4|1|Cable Set for Both Axis|Y
01|126859|4|1|Replaced part # A16MM-P2|Y
01|126862|6|1|Gear Box|Y
01|126862|8|1|External cable set + cable retractor|Y
01|126862|10|1|On site travel and labor standard bulkhead external|Y
01|126862|10|2|cable connections|Y
01|126862|10|3|Mori NVX7000 s/n.NV701160903|Y
01|126869|3|1|ETA 2 Weeks|Y
01|126869|5|1|1 stock balance 14-16 weeks|Y
01|126872|1|1|320MM table with Haas motor and cable set.|Y
01|126874|3|1|HSK63A-SK13-90|Y
01|126874|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126874|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126874|5|1|HSK63A-SK20-90|Y
01|126874|5|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126874|6|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|126919|2|1|Installation includes: drive unit short bar fiber|Y
01|126919|2|2|optic cables communication cables bulk head cable|Y
01|126919|2|3|set external cable set parameter changes service|Y
01|126919|2|4|time and travel|Y
01|126931|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|126931|6|1|c + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|126931|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|126931|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|126931|6|5|MUST CONFIRM MACHINE LADDER FOR DDRT TABLE|Y
01|126931|6|6|PARAMETER DATA SHEETS NEEDED/ LADDER OPTION FOR DDRT|Y
01|126931|6|7|APPLICATION TO BE CONFIRMED. AIR PURGE INCLUDED|Y
01|126931|8|1|LYNDEX NIKKEN TOOL CERTIFICATE $ 2000 FACE VALUE N/C|Y
01|126937|9|1|OPTIONAL TORQUE WRENCH|Y
01|126937|10|1|TORQUE WRENCH ATTACHMENT|Y
01|126949|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|126949|3|1|This is our new standard - Will have pluggable|Y
01|126949|3|2|coolant ports.|Y
01|126953|1|1|Repair Quote for 5AX-130YA SN: N/A|Y
01|126953|1|2|Both Axis need to be completley rebuilt|Y
01|126953|1|3|Machine tool crash at some point|Y
01|126953|36|1|New Solenoids for Air Brake|Y
01|126974|1|1|Repair Quote for 5AX-130YA SN: N/A|Y
01|126974|1|2|Both Axis need to be completley rebuilt|Y
01|126974|1|3|Machine tool crash at some point|Y
01|126974|2|1|Replacement Table from L/N Used Warehouse|Y
01|126974|2|2|This was loaner table for previous customer and had|Y
01|126974|2|3|light use to it.|Y
01|126977|77|1|PRICE INCLUDES BOTH CAT40 & CAT50 POTS FOR UNIT|Y
01|126977|77|2|TRAINING FOR EMPLOYEES ALSO INCLUDED.|Y
01|126992|2|1|ETA 1 WK after spindle drawing confirmed|Y
01|126996|1|1|Tooling Certificate Number to be determined after|Y
01|126996|1|2|receipt of order.|Y
01|127007|2|1|P/N: C50RAM-ER32-180TSEC-110TP|Y
01|127007|2|2|CAT50 Taper ER32 Angle Head Twin Spindle 110mm Pitch|Y
01|127007|2|3|Tapered Pin with External Coolant|Y
01|127018|12|1|CONFIRM SHANK SIZE|Y
01|127018|45|1|Tool#28 confirm Shank|Y
01|127019|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|127019|6|1|c + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|127019|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|127019|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|127019|6|5|MUST CONFIRM MACHINE LADDER FOR DDRT TABLE|Y
01|127019|6|6|PARAMETER DATA SHEETS NEEDED/ LADDER OPTION FOR DDRT|Y
01|127019|6|7|APPLICATION TO BE CONFIRMED. AIR PURGE INCLUDED|Y
01|127019|8|1|LYNDEX NIKKEN TOOL CERTIFICATE $ 2000 FACE VALUE N/C|Y
01|127050|1|1|Add high speed nut|Y
01|127050|2|1|Add to holder above|Y
01|127081|2|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|127081|2|2|External Cables Service Time & Travel.|Y
01|127081|2|3|Machine is a Hwacheon Sirius-UZ with Fanuc 31i-B Contrl|Y
01|127084|1|1|H40E-SF0375-1.75  HSK40E 3/8 Shrink Fit Holder|Y
01|127084|1|2|Backup Screw: SF-STOP-SCREW-10|Y
01|127084|3|1|H40E-SF0375-1.75  HSK40E 3/8 Shrink Fit Holder|Y
01|127084|3|2|Backup Screw: SF-STOP-SCREW-10|Y
01|127089|1|1|Reference RGA# TOR-54564|Y
01|127089|1|2|Repair of 1 x HSK63A-C1.1/4-110G|Y
01|127089|4|1|Regreasing included.|Y
01|127113|1|1|BT50-FMH31.75-76-45|Y
01|127113|1|2|BT50 FMH Face Mill Holder|Y
01|127113|2|1|BT50-FMH31.75-76-75|Y
01|127113|2|2|BT50 FMH Face Mill Holder|Y
01|127113|3|1|BT50-FMH31.75-76-105|Y
01|127113|3|2|BT50 FMH Face Mill Holder|Y
01|127113|4|1|BT50-FMH31.75-76-150|Y
01|127113|4|2|BT50 FMH Face Mill Holder|Y
01|127113|8|1|BT50-FMA38.1-150|Y
01|127113|8|2|BT50 1.1/2 Face / Shell Mill Holder|Y
01|127113|10|1|BT50-FMA50.8-45|Y
01|127113|10|2|BT50 50.8mm Face / Shell Mill Holder|Y
01|127113|16|1|BT50-MTA2-45|Y
01|127113|16|2|BT50 Morse Taper MT2 Holder|Y
01|127113|19|1|BT50-ZH24CH-105|Y
01|127113|19|2|ZH24 Rigid Tap Holder Coolant|Y
01|127113|20|1|BT50-ZH24CH-135|Y
01|127113|20|2|ZH24 Rigid Tap Holder Coolant|Y
01|127113|21|1|BT50-ZH24CH-165|Y
01|127113|21|2|ZH24 Rigid Tap Holder Coolant|Y
01|127113|22|1|ZMK24-24|Y
01|127113|22|2|ZKM24 PosiDrv Rigid Tap Collet|Y
01|127135|1|1|GN30K Master gauge|Y
01|127136|1|1|Reference RGA# TOR-54284|Y
01|127136|1|2|Repair of Tool#1 HSK100A-C3/4-115G|Y
01|127136|5|1|Regrease included.|Y
01|127136|7|1|Repair of Tool#2 HSK100A-C3/4-115G|Y
01|127136|10|1|Regrease included|Y
01|127144|1|1|NC5-46-ZH12CH-80|Y
01|127144|1|2|NC5 Tapper chuck for synchronized tapping|Y
01|127144|2|1|ZMK12-6|Y
01|127144|2|2|ZKN Tap collet|Y
01|127144|3|1|NC5-46-Z12-100|Y
01|127144|3|2|NC5 Tapper chuck Floating|Y
01|127144|5|1|ST25-ZT12|Y
01|127144|5|2|Straight tapper chuck Floating|Y
01|127144|6|1|ZMK12-6|Y
01|127144|6|2|ZKN Tap collet|Y
01|127148|2|1|AWEA*|Y
01|127148|3|1|AWEA*|Y
01|127148|4|1|*YCM|Y
01|127148|5|1|*YCM|Y
01|127148|7|1|cross from Fitz-Rite 50RK-138-30|Y
01|127160|1|1|Replaces the BT40-SF0500-3.54|Y
01|127172|4|1|Wrehnch for NBT30-C1-75|Y
01|127172|5|1|Wrench for NBT30-C1-75G|Y
01|127172|7|1|Wrench for NBT30-C3/4-75|Y
01|127172|8|1|Wrench for NBT30-C3/4-75G|Y
01|127176|1|1|Reference RGA# TOR-54082|Y
01|127176|1|2|Repair of HSK100A-C20EX-116|Y
01|127176|6|1|Regreasing included.|Y
01|127182|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|127182|3|2|INCLUDED AT NO COST TO MORRIS SOUTH|Y
01|127188|2|1|*comes with collet nut|Y
01|127188|2|2|*overall length of 6.11/ Shank Length 5|Y
01|127188|3|1|wrench for ER11 Extension|Y
01|127190|1|1|Customer will take care of draw nut this is replacemen|Y
01|127199|1|1|w/ L1 4 Projection|Y
01|127205|1|1|Reference RGA# LVR-54461|Y
01|127205|1|2|Repair of MZMP5-CT40Z s/n: 97613 02|Y
01|127205|1|3|(Mimatic# 124626)|Y
01|127205|2|1|Bearings seals o-rings and ID plate to be replaced.|Y
01|127205|4|1|Repair of MZMP5-CT40Z s/n: 97613 03|Y
01|127205|5|1|Bearings seals o-rings and ID plate to be replaced.|Y
01|127212|1|1|Ref. Alps OHA03-12000 / Quoted at net price.|Y
01|127220|1|1|Reference RGA# LVR-54531|Y
01|127220|1|2|Repair of MZMP5-CT40Z s/n: 18901127 02|Y
01|127220|1|3|(Mimatic# 124626)|Y
01|127220|2|1|Bearings seals o-rings and ID plate to be replaced.|Y
01|127222|1|1|Tooling Certificate Number: 5410-1013-081817|Y
01|127278|2|1|ETA 1 WK after spindle drawing confirmed|Y
01|127279|2|1|ETA is after order is placed|Y
01|127289|1|1|Seal Kit for C1SB-115-M4774 (R-Cylinder M-4774)|Y
01|127295|1|1|quoted as an in stock option for line 2|Y
01|127305|3|1|Chuck with adapter plate|Y
01|127305|4|1|Cylider draw rod and adapter plate|Y
01|127305|4|2|e|N
01|127305|6|1|Tailstock adapter plate|Y
01|127318|1|1|REPAIR OF CNC202AA21 SN: 26797TC|Y
01|127318|1|2|TAR-54688|Y
01|127318|1|3|Customer getting Alarms on table|Y
01|127318|1|4|Cable was damaged and Motor Encoder was damaged|Y
01|127319|2|1|22 pcs due 4/7 balance by June 15th|Y
01|127319|7|1|Balance 12-14 weeks ARO|Y
01|127319|11|1|I ADDED THE SK10 AND BULLSEYE COLLETS TOGETHER;|Y
01|127319|11|2|THEY BOTH ARE SK10 HOLDERS; THE BULLSEYE JUST HAS|Y
01|127319|11|3|ADJUSTMENT CAMS TO REDUCE RUNOUT MANUALLY.|Y
01|127322|23|1|PART # IRTW-34 SNAP RING|Y
01|127353|1|1|**non-cancellable/non-returnable|Y
01|127364|1|1|Quote is based on Standard pitch.|Y
01|127364|3|1|Quote is based on Standard pitch.|Y
01|127368|1|1|Quoted at net price.|Y
01|127392|14|1|This item is considered special once ordered it can|Y
01|127392|14|2|not be cancelled or returned.|Y
01|127397|1|1|Inspection/disassembly of 5AX-130FA SN: 5561 5567|Y
01|127397|1|2|Tables were found to have no issues|Y
01|127397|1|3|Re-Assembled and tested.|Y
01|127397|1|4|Labor Cost Only|Y
01|127397|1|5|TAR-54606|Y
01|127397|2|1|15 Hours x 2 tables = 30 Hours Total|Y
01|127401|3|1|NO WORKHOLDING INCLUDED|Y
01|127401|8|1|INSTALLATION INCLUDES DRIVE CABLES EXTERNAL CABLES|Y
01|127401|8|2|TRAVEL AND LABOR INCLUDED|Y
01|127401|8|3|CONFIRMATION OF MACHINE LADDER NEEDED AND ADDITIONAL|Y
01|127401|8|4|AXIS NEEDED FROM FANUC ONCE CONFIRM ED BY MACHINE DATA|Y
01|127419|1|1|Reference RGA# QUA-54614|Y
01|127419|1|2|Repair of HA40-ER32X-4500RPM s/n: AL0034|Y
01|127419|1|3|(Alps# HAA00-11000S)|Y
01|127419|2|1|Bearings o-rings seals collet nut spindle and|Y
01|127419|2|2|spindle cover to be replaced.|Y
01|127419|4|1|Repair of HA40-ER32X-4500RPM s/n: AL0047|Y
01|127419|4|2|(Alps# HAA00-11000S)|Y
01|127419|5|1|Bearings o-rings seals collet nut and gears to be|Y
01|127419|5|2|replaced.|Y
01|127449|3|1|Lyndex-Nikken to make block.|Y
01|127449|3|2|Delivery is from receipt of spindle drawing info|Y
01|127453|2|1|- PTS should issue us a consignment PO with the price|Y
01|127453|2|2|of items.|Y
01|127453|2|3|- If there is no consignment PO we can not provide|Y
01|127453|2|4|any items for test cut.|Y
01|127453|2|5|- Max duration for the test cut is 2 months.|Y
01|127453|2|6|- All of items we provided should be either purchased|Y
01|127453|2|7|by customer or returned to us with test report after|Y
01|127453|2|8|the test cut period.|Y
01|127453|2|9|- Any missing items or damaged items must be paid|Y
01|127453|2|10|by customer or PTS|Y
01|127455|2|1|Quoted AS net pricing non-returnablenon-cancelable|Y
01|127455|2|2|Start with 2 pcs test pcs then they will confirm|Y
01|127466|1|1|Will not work with Erickson Quick Change|Y
01|127486|17|1|This item is considered special once ordered it|Y
01|127486|17|2|cannot be cancelled or returned.|Y
01|127486|20|1|This item is considered special once an order is|Y
01|127486|20|2|placed it cannot be cancelled or returned.|Y
01|127498|1|1|HSK100A-SK16C-150-IDU|Y
01|127498|1|2|Need ID hole only|Y
01|127498|3|1|Need ID hole and chip|Y
01|127498|4|1|Need ID hole only|Y
01|127517|3|1|SCALE FOR TILT AXIS|Y
01|127517|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|127517|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|127517|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|127517|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|127519|3|1|All deliveries must be with random inspection|Y
01|127519|3|2|certification.|Y
01|127526|4|1|Qty 5 ETA 12/9 remaining balance 1-2 weeks|Y
01|127538|3|1|All deliveries must be with random inspection|Y
01|127538|3|2|certification.|Y
01|127543|1|1|EVALUATION OF 5AX-130FA SN: 5029|Y
01|127543|1|2|Table had bad machine crash not salvagable.|Y
01|127543|1|3|Quoting replacement below.|Y
01|127543|2|1|** SPECIAL 1 TIME PRICE CORE TRADE IN **|Y
01|127562|1|1|180MM table with Haas motor and cable set.|Y
01|127569|6|1|second 10 on quote #127681|Y
01|127589|1|1|ETA 12/27 please note item may not ship until after|Y
01|127589|1|2|the holidays|Y
01|127598|1|1|START 2 PACKAGE WILL INCLUDE 10 CAT40 Taper Holders w|Y
01|127598|1|2|Coolant Ports|Y
01|127600|1|1|8115-2471-102919RT|Y
01|127602|1|1|*** Pricing special based on a particular stock unit|Y
01|127603|2|1|CNC260TFA-M-10+1|Y
01|127603|2|2|Enshu exclusive table as per the drawing TCA-A2163|Y
01|127603|2|3|Motor and Rotary Joint are included|Y
01|127603|3|1|CST101-135-RJ1|Y
01|127603|3|2|Support Table with 1 Port Rotary Joint.|Y
01|127603|4|1|Air Shipment freight from Japan to US|Y
01|127608|2|1|RT-CN260SD-10+1-L|Y
01|127608|2|2|10+1 Rotary Joint        CYLINDER TYPE|Y
01|127608|3|1|CST101-135-RJ1|Y
01|127608|3|2|Support Table with 1 Port Rotary Joint.|Y
01|127608|4|1|Air Freight from Japan to USA|Y
01|127608|4|2|Lyndex-Nikken bears 50%|Y
01|127612|1|1|C5006-0750A-5.75-ID-GKN UNV#36 CAT50 3/4 End Mill|Y
01|127612|1|2|Holder Aerospace GKN UNV#36 With ID Chip Hole|Y
01|127613|1|1|C5006-0750A-5.75-ID-GKN UNV#36 CAT50 3/4 End Mill|Y
01|127613|1|2|Holder Aerospace GKN UNV#36 With ID Chip Hole|Y
01|127624|1|1|Reference RGA# CUR-54666|Y
01|127624|1|2|Repair of C40RAM-ER25-215STC-M s/n: 714702|Y
01|127624|1|3|(Mimatic# 195729)|Y
01|127624|2|1|Bearings seals and o-rings to be replaced.|Y
01|127624|2|2|CAT40 spindle is also damaged this must be replaced.|Y
01|127628|1|1|14 in stock ETA pending on remaining pieces|Y
01|127634|1|1|RTP#11276  SN:XXXX|Y
01|127641|1|1|(1) PC ETA 1 WK Balance 25-26 WKS|Y
01|127642|1|1|part# 160-072-SP|Y
01|127642|1|2|16C 1.1/8 Custom Collet|Y
01|127642|1|3|Collet will have additional .085 material on gripping|Y
01|127642|1|4|end of collet and additional .040 material on threaded|Y
01|127642|1|5|end of collet.|Y
01|127652|1|1|Discount reflects a PO of 1~10 tools|Y
01|127652|2|1|Discount reflects a PO of 11~20 tools|Y
01|127652|3|1|Discount reflects a PO of 30+ tools.|Y
01|127654|1|1|Reference RGA# TOR-54646|Y
01|127654|1|2|Repair of PF-2|Y
01|127654|2|1|Calibration service included.|Y
01|127658|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|127664|4|1|Quoted at Net price.|Y
01|127673|1|1|RGA#TAR-54541|Y
01|127673|1|2|CNC400V  SN:4488|Y
01|127673|25|1|CN322R051|Y
01|127676|1|1|Tooling Certificate Number: 13435-2383-080119|Y
01|127679|1|1|REPAIR OF CNC202AA21 SN: 27745TC|Y
01|127679|1|2|TAR-54688|Y
01|127679|1|3|Customer getting Alarms on table|Y
01|127679|1|4|Cable was damaged and Motor Encoder was damaged|Y
01|127680|2|1|Cable set for CNC180FA-M|Y
01|127684|1|1|Reference RGA# TOR-54636|Y
01|127684|1|2|Repair of HP-100|Y
01|127684|5|1|Calibration service included.|Y
01|127693|1|1|Reference RGA# TOR-54643|Y
01|127693|1|2|Repair of CAT40-NPU8-110U-IDU|Y
01|127716|1|1|Tooling Certificate Number: 13687-2371-071119|Y
01|127725|1|1|Plug DIN holes on C4006-0875B-DINlead 3-5 days|Y
01|127730|1|1|2 in stock in IL 3 in Japan (1-2weeks) remaining|Y
01|127730|1|2|pieces ETA is 2-3 weeks from date of order|Y
01|127730|1|3|This item is non-cancellable/non-returnable|Y
01|127738|1|1|Reference RGA# LVR-54692|Y
01|127738|1|2|Repair of OKL3-ER32Z s/n: AL725|Y
01|127738|1|3|(Alps# OK101-13000)|Y
01|127738|2|1|Bearings o-rings seals collet nut and spindle to be|Y
01|127738|2|2|replaced.|Y
01|127740|1|1|3 PCS ETA 3 WKS1 PC ETA 8-9 WKS|Y
01|127740|1|2|Non-returnablenon-cancelable|Y
01|127768|1|1|Reference RGA# CUR-54737|Y
01|127768|1|2|Repair of C50RAM-ER25-180-110TP s/n; 64649 01|Y
01|127768|1|3|(Mimatic# 178155)|Y
01|127768|2|1|Bearings seals and o-rings to be replaced.|Y
01|127774|1|1|TAR-54638|Y
01|127774|1|2|CNCZ180LSA3 SN: 7120|Y
01|127780|5|1|Recommended for Coolant Fed Drill|Y
01|127781|6|1|EXTERNAL CABLE SET BOTH AXIS|Y
01|127781|12|1|NIKKEN SK COLLET CHUCK WITH MITSUBISHI ENDMILLS|Y
01|127784|1|1|P/N: SX 8.8  REAMER|Y
01|127784|1|2|1-2 pieces|Y
01|127784|2|1|3-4 Pieces|Y
01|127784|3|1|5-9 Pieces|Y
01|127784|4|1|10 Pieces|Y
01|127795|2|1|16C dead lenght collet closer and adpater plate.|Y
01|127795|4|1|Sub Plate is required to match the table center height|Y
01|127795|4|2|Sub Plate not included.|Y
01|127799|1|1|B40S5-0875 is discontinued quoting replacement|Y
01|127805|1|1|Delv = 25pcs 2wks balance of 5 pcs = pending|Y
01|127807|4|1|6500 Max Input -> 12000 Output|Y
01|127824|1|1|PROPER FIT TO MACHINE TO BE CONFIRMED|Y
01|127824|7|1|OPTION #1 TAILSTOCK W/CENTER|Y
01|127824|7|2|ADDITIONAL PART INFO NEEDED|Y
01|127824|13|1|PRICE IS NET TO FLINT MACHINE|Y
01|127824|13|2|PRICE INCLUDES SERVO MOTOR ALL TRAVEL EXPENSES AND|Y
01|127824|13|3|MISC ITEMS FOR PROFESSIONAL INSTALL.|Y
01|127824|13|4|MACHINE DATA SHEETS NEEDED PRIOR TO INSTALL|Y
01|127837|1|1|REPAIR FOR CNC302BFA SN: 7681|Y
01|127837|1|2|TAR-54634|Y
01|127859|1|1|Quoted at net price.|Y
01|127859|3|1|Quoted at net price.|Y
01|127876|5|1|Includes A2-8 adapter plate|Y
01|127876|6|1|Please provide info for the threaded draw nut.Once we|Y
01|127876|6|2|have that info we can better tell what the lead will be|Y
01|127876|6|3|on this.It should be approximately 2-3 wks max either|Y
01|127876|6|4|and could be as soon as 1-2 wks|Y
01|127876|9|1|Lead end of February|Y
01|127884|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|127884|2|2|INCLUDED AT NO COST TO MRT.|Y
01|127885|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|127885|4|2|AT NO COST TO MRT.|Y
01|127889|1|1|Quoted at Net Price|Y
01|127891|25|1|Replacement for C5017-0020-4.00|Y
01|127893|1|1|Repair for CNC202LFA SN: 8145|Y
01|127893|1|2|TAR-54586|Y
01|127893|23|1|TAT-170 Was included with shipment|Y
01|127893|23|2|TAT-170 is un-repairable due to excessive damage|Y
01|127893|23|3|Internally.  Replacement is quoted below:|Y
01|127893|24|1|** 1 time core trade in price **|Y
01|127903|1|1|TCE-D6023 Power/Signal Cable|Y
01|127903|1|2|3-4 week leadtime|Y
01|127903|2|1|TCE-96399 Feedback cable|Y
01|127903|2|2|3-4 week leadtime|Y
01|127904|1|1|Tooling Certificate Number:|Y
01|127913|5|1|Installation includes: Drive unit short bar fiber|Y
01|127913|5|2|optic cable communications cable bulkhead cables|Y
01|127913|5|3|external cables parameter changes service time and|Y
01|127913|5|4|travel.|Y
01|127913|5|5|Also modificaiton to machine to route cables.|Y
01|127913|6|1|APROX 100MM RISER BLOCK FOR CLEARANCE.|Y
01|127921|2|1|Delv = 10pcs 1 week balance 20pcs end of January|Y
01|127942|1|1|ATTENTION: A unit from used inventory should be sent|Y
01|127942|1|2|first for testing. Upon successful test a new unit|Y
01|127942|1|3|will be sent to replace the used one. Test is successfu|Y
01|127942|1|4|if 1/4 endmill does not pull out. Having issues with ER|Y
01|127952|3|1|NOTE: The tailstock needs a riser plate to match the|Y
01|127952|3|2|rotary table center height.|Y
01|127952|3|3|RISER NOT INCLUDED|Y
01|127952|5|1|Installation includes: Drive unit short bar fiber|Y
01|127952|5|2|optic cable communications cable bulkhead cables|Y
01|127952|5|3|external cables parameter changes service time and|Y
01|127952|5|4|travel.|Y
01|127965|2|1|Cable Set|Y
01|127967|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|127967|3|2|External Cables Service Time & Travel.|Y
01|127977|1|1|***Being sold on a new CNC180LSA-BR2***|Y
01|127997|1|1|B5007-0020-5.905 ER20 Collet Chuck/ Gage Length 5.905|Y
01|127997|1|2|(150mm)|Y
01|127997|1|3|Quoted at Net Price|Y
01|127997|2|1|B5007-0032-100 BT50 ER32 Collet Chuck/3.937 (100mm)|Y
01|127997|2|2|Gage Length|Y
01|127997|2|3|Quoted at Net Price|Y
01|127997|3|1|B5007-0032-7.874  BT50 ER32 Collet Chuck/ Gage Length|Y
01|127997|3|2|7.874 (200mm)|Y
01|127997|3|3|Quoted at Net Price|Y
01|127997|10|1|B5001-0750-9.00 Shell Mill Holder 3/4 with 9.0 Gage|Y
01|127997|10|2|Length Minimum Order 3-Tools|Y
01|127997|10|3|Quoted at Net Price|Y
01|128008|1|1|Reference RGA# LVR-54693|Y
01|128008|1|2|Repair of OKEX-CAPTO4Z-ICE-7DEG s/n: 89798 01|Y
01|128008|1|3|(Mimatic# 190981)|Y
01|128008|2|1|Bearings seals o-rings and capto clamping mechanism|Y
01|128008|2|2|to be replaced.|Y
01|128009|2|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|128009|2|2|External Cables Service Time & Travel.|Y
01|128009|2|3|Machine = Hwacheon Vesta 660 with Fanuc 0i-MF control|Y
01|128014|1|1|Part Number TBD  BMT45-ER16-AD-ICE  BMT45 LIVE|Y
01|128014|1|2|ADJ HEAD;INT/ EXT COOLANT;1:1 GEAR; MAX 12Nm TORQUE;|Y
01|128014|1|3|6500 RPM;REF DRWG # 00056513|Y
01|128014|2|1|Part Number TBD  BMT45-ER16-AD-ICE  BMT45 LIVE|Y
01|128014|2|2|ADJ HEAD;INT/ EXT COOLANT;1:1 GEAR; MAX 12Nm TORQUE;|Y
01|128014|2|3|6500 RPM;REF DRWG # 00056513|Y
01|128014|3|1|Part Number TBD  BMT45-ER16-AD-ICE  BMT45 LIVE|Y
01|128014|3|2|ADJ HEAD;INT/ EXT COOLANT;1:1 GEAR; MAX 12Nm TORQUE;|Y
01|128014|3|3|6500 RPM;REF DRWG # 00056513|Y
01|128014|4|1|Part Number TBD  BMT45-ER16-AD-ICE  BMT45 LIVE|Y
01|128014|4|2|ADJ HEAD;INT/ EXT COOLANT;1:1 GEAR; MAX 12Nm TORQUE;|Y
01|128014|4|3|6500 RPM;REF DRWG # 00056513|Y
01|128015|1|1|*Installed with pull stud PS-N63AE at factory|Y
01|128015|2|1|Installed on NC5-63-C12-65 at factory|Y
01|128021|1|1|2.50 Diameter|Y
01|128021|2|1|2.25 dia|Y
01|128021|3|1|2.50 dia|Y
01|128021|4|1|3.88 dia|Y
01|128021|5|1|2.50 dia|Y
01|128021|6|1|3.88 dia|Y
01|128041|2|1|This item is considered special once an order is|Y
01|128041|2|2|placed it cannot be cancelled or returned|Y
01|128042|2|1|Reference RGA# TAR-53830|Y
01|128042|2|2|5AX-201YA S/N: 3654|N
01|128055|2|1|External power and feedback cables|Y
01|128061|1|1|Reference RGA# CUR-54710|Y
01|128061|1|2|Repair of MRAM-ER25-IC s/n: 93948 02|Y
01|128061|1|3|(Mimatic# 162765)|Y
01|128061|2|1|Bearings seals o-rings and damaged ER25 spindle|Y
01|128061|2|2|to be replaced.|Y
01|128061|4|1|Repair of MRAM-EXT-100 s/n: 43875 07|Y
01|128061|4|2|(Mimatic# 162758)|Y
01|128061|5|1|Bearings and seals to be replaced.|Y
01|128061|7|1|Repair of C50-MRAM-IC s/n: 94386 02|Y
01|128061|7|2|(Mimatic# 162814)|Y
01|128061|8|1|Bearings seals o-rings and GAT seal to be replaced.|Y
01|128064|1|1|This item is discontinued and replaced with the item on|Y
01|128064|1|2|line 2|Y
01|128064|2|1|Replacement for B40-1500(ISO)|Y
01|128065|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|128065|2|2|INCLUDED AT NO COST TO METHODS MACHINE TOOLS|Y
01|128066|2|1|Cable Set|Y
01|128067|1|1|WITH HAAS MOTOR AND CABLES|Y
01|128067|4|1|HYDRAULIC UNIT FOR BRAKE|Y
01|128067|7|1|PRICING FOR BUDGETARY. REVIEW OF APPLICATION NEEDED|Y
01|128067|7|2|TO CONFIRM CORRECT RIGHT ANGLE HEAD|Y
01|128067|7|3|ALSO NEEDED A LOCATOR BLOCK FOR RIGHT ANGLE HEAD|Y
01|128067|7|4|PRICING ABOVE FOR QUANTITY OF 1 PC|Y
01|128067|13|1|PRICE IS NET TO FLINT MACHINE|Y
01|128067|13|2|PRICE INCLUDES SERVO MOTOR ALL TRAVEL EXPENSES AND|Y
01|128067|13|3|MISC ITEMS FOR PROFESSIONAL INSTALL.|Y
01|128067|13|4|MACHINE DATA SHEETS NEEDED PRIOR TO INSTALL|Y
01|128110|10|1|I ADDED THE SK10 AND BULLSEYE COLLETS TOGETHER;|Y
01|128110|10|2|THEY BOTH ARE SK10 HOLDERS; THE BULLSEYE JUST HAS|Y
01|128110|10|3|ADJUSTMENT CAMS TO REDUCE RUNOUT MANUALLY.|Y
01|128113|1|1|Tooling Certificate Number: 13220-XXXX-121619|Y
01|128118|4|1|Requires same wrenches as noted on line 2 and 3|Y
01|128118|5|1|Requires same wrenches as noted on line 2 and 3|Y
01|128118|6|1|Same wrenches as shown in line 2 and 3|Y
01|128123|3|1|Replaces B3027-0016-5.00|Y
01|128123|11|1|replaces B3017-0032-5.00|Y
01|128129|15|1|1/8 5/16 1/2 & 3/4 Delivery is aprox. 4 weeks|Y
01|128136|2|1|Includes drive unit external cables interface cables|Y
01|128136|2|2|communications cable short bar travel labor|Y
01|128136|2|3|expense.|Y
01|128147|6|1|Optional|Y
01|128147|7|1|Optional|Y
01|128147|8|1|Optional|Y
01|128156|1|1|TABLE INCLUDES SERVO MOTOR. M AT END OF PART NUMBER|Y
01|128156|1|2|SIGNIFIES MOTOR INCLUDED.|Y
01|128156|2|1|AIR/HYD BOOSTER FOR ROTARY TABLE BRAKE|Y
01|128156|4|1|includes:  short bar fiber optic cables|Y
01|128156|4|2|bulkhead cables external cablesparameter changes|Y
01|128156|4|3|service time and travel.|Y
01|128156|4|4|Machine must have ladder for the additional 1 axis|Y
01|128156|4|5|KITAMURA TO SUPPLY DRIVE UNIT|Y
01|128156|4|6|ALLPRICES ABOVE REFLECT 1 TABLE INSTALLED PER MACHINE|Y
01|128158|3|1|*72mm Centerline|Y
01|128158|4|1|*100mm Centerline|Y
01|128172|2|1|Installation included:Drive unit short bar fiber|Y
01|128172|2|2|optic cable communications cablesbulkhead cables|Y
01|128172|2|3|external cables parameter changes service time and|Y
01|128172|2|4|travel.|Y
01|128182|1|1|NC50-46-ZH12CH-80|Y
01|128182|1|2|NC5 Tapper chuck for synhronized tap Coolant thru|Y
01|128182|1|3|Price for 1-6 pcs|Y
01|128182|2|1|OZMK12-6-OM|Y
01|128182|2|2|OZMK12 tap collet Coolant thru|Y
01|128182|2|3|Price for 1-6 pcs|Y
01|128182|3|1|NC5-46-ZL12C-195|Y
01|128182|3|2|NC5 Tapper chuck for Tension-Compression Coolant thru|Y
01|128182|3|3|Price for 1-6 pcs|Y
01|128182|4|1|OZK12-6|Y
01|128182|4|2|OZK12 tap collet Coolant thru|Y
01|128182|4|3|Price for 1-6 pcs|Y
01|128187|1|1|Reference RGA# LVR-54644|Y
01|128187|1|2|Repair of BMT65-ER32Z-ICE s/n: 7801912|Y
01|128187|1|3|(Mimatic# 186492)|Y
01|128187|2|1|Bearings seals and o-rigns to be replaced|Y
01|128187|2|2|Repair price has been reduced as a one-time courtesy.|Y
01|128203|1|1|Reference RGA# QUA-54603|Y
01|128203|1|2|Repair of OKEX-ER32Z-MS s/n: AL0056|Y
01|128203|1|3|(Alps# OKA00-21001)|Y
01|128203|2|1|Bearings o-rings collet nut and bevel gears to be|Y
01|128203|2|2|replaced|Y
01|128221|1|1|Reference RGA# CUR-54629|Y
01|128221|1|2|Repair of MRAM-MI40-IC s/n: 65612 01|Y
01|128221|1|3|(Mimatic# 159994)|Y
01|128221|2|1|Bearings seals and o-rings to be replaced. This will|Y
01|128221|2|2|convert the MRAM-MI40-IC into ER25. We will cover the|Y
01|128221|2|3|cost of the ER25 spindle and thred ring.|Y
01|128223|1|1|Delivery will be determind in the morning. In order|Y
01|128223|1|2|to receive presetter by 12/30/19 a purchase order|Y
01|128223|1|3|must be received by noon on 12/18/19.|Y
01|128225|8|1|1 in stock 1 in Japan (3 weeks) if no stock at time|Y
01|128225|8|2|of order 2-1/2 months ETA|Y
01|128225|23|1|closest match to CAT50-C2-105|Y
01|128225|26|1|Replacement for C5007-0040-8.00|Y
01|128230|1|1|Without Motor|Y
01|128230|1|2|Nikken adds a dowel pin hole|Y
01|128230|2|1|With Motor|Y
01|128230|2|2|Nikken adds a dowel pin hole|Y
01|128245|1|1|tool cert to cover quote 128006|Y
01|128259|1|1|Reference RGA# TOR-54789|Y
01|128259|1|2|Repair of B4005-0562-4.47|Y
01|128265|1|1|Reference RGA# LVR-54803|Y
01|128265|1|2|BMT55-SK20X-ICE s/n: 76625 01|Y
01|128265|1|3|(Mimatic# 187162)|Y
01|128265|2|1|Bearings seals o-rings worn spindle and coolant|Y
01|128265|2|2|bushings to be replaced.|Y
01|128281|1|1|Ref. old part# W10R5-0562-3.74|Y
01|128281|2|1|Ref. old part# W10S5-0562-1.56|Y
01|128306|6|1|Includes drive unit external cables interface cables|Y
01|128306|6|2|communications cable short bar fiber optic cable|Y
01|128306|6|3|travel labor expenses|Y
01|128314|5|1|EXTERNAL POWER/FEEDBACK CABLE SET INCLUDED IN EITHER|Y
01|128314|5|2|ABOVE TABLES|Y
01|128321|1|1|replacement for old part# B4004-0562-4.47|Y
01|128331|4|1|In stock length option to item above|Y
01|128348|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|128352|2|1|Installed on the NC5-46-C25-90 at the factory|Y
01|128363|2|1|This item is non standard and considered special|Y
01|128363|2|2|Price is quoted as NET price.|Y
01|128367|1|1|w/o Tosnuc motor. Toshiba Machine will provide.|Y
01|128367|1|2|Special Order. Unit Price Each.|Y
01|128367|2|1|Angle plate for CNC1600TOS for vertical use|Y
01|128367|2|2|Special Order. Unit Price Each.|Y
01|128367|3|1|Scale Kit Heidenhain RON 886|Y
01|128367|3|2|includes Scale Scale monunt kit Cover and Int.wiring|Y
01|128367|3|3|Special Order. Unit Price Each.|Y
01|128367|5|1|Installation(with Toshiba Assistance) includes entering|Y
01|128367|5|2|Rotary table parameters set up Lyndex hydraulic pump|Y
01|128367|5|3|& hoses Rotary table cable management travel labor|Y
01|128367|5|4|expenses.  ***Toshiba Machine provide Motor Amp &|Y
01|128367|5|5|Interface Arrangements.|Y
01|128375|2|1|INSTALLATION NOT INCLUDED|Y
01|128375|3|1|MATCHING TAILSTOCK FOR ABOVE CNCZ-100-2W|Y
01|128386|1|1|Pricing is based on quantity of 4 if lesser quantity|Y
01|128386|1|2|is ordered pricing will need to be re-quoted|Y
01|128397|5|1|2pc stk under this old part #see below for new part #|Y
01|128397|11|1|$ 5.00 PULLSTUD PROMO. EVERY HOLDER RECEIVE $5.00 PS|Y
01|128416|1|1|Includes (2)HSK63A Pots|Y
01|128455|1|1|Repair of Rotary Table 5AX-201 SN 4316|Y
01|128455|1|2|Below is repair items and also other items to|Y
01|128455|1|3|be complete working rotary table for Brother Machine|Y
01|128466|6|1|75 in stock remaining pieces ETA is 1/6/20|Y
01|128481|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|128481|2|1|Quoted as NET pricing Non-returnablenon-cancelable|Y
01|128487|1|1|ETA is end of March 2020|Y
01|128487|2|1|Limited Stock non-cancellable non returnable after|Y
01|128487|2|2|receipt of PO|Y
01|128491|2|1|This item is considered special and cannot be returned.|Y
01|128491|3|1|This item is considered special and cannot be returned.|Y
01|128491|4|1|This item is considered special and cannot be returned.|Y
01|128491|5|1|This item is considered special and cannot be returned.|Y
01|128491|6|1|This item is considered special and cannot be returned.|Y
01|128501|6|1|EXTERNAL CABLE SET BOTH AXIS|Y
01|128501|12|1|NIKKEN SK COLLET CHUCK WITH MITSUBISHI ENDMILLS|Y
01|128503|2|1|Hose Solenoid Manifold Pressure switch Fittings are|Y
01|128503|2|2|included|Y
01|128503|3|1|Installation includes entering Rotary table parameters|Y
01|128503|3|2|set up Lyndex hydraulic pump & hoses|Y
01|128503|3|3|Rotary table cable management|Y
01|128503|3|4|Checking the table accuracy|Y
01|128503|3|5|(note) we don't lift and place the table on the machine|Y
01|128503|5|1|Scales for 4th and 5th axis|Y
01|128503|5|2|includes Scale Scale monunt kit Cover and int wiring|Y
01|128503|6|1|Riser Plates to bring up rotary axis to mount scale|Y
01|128503|7|1|Air freight cost|Y
01|128505|1|1|HFO TO PROVIDE LYNDEX NIKKEN MOTOR AND CABLES|Y
01|128505|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|128522|1|1|Reference RGA# TOR-54699|Y
01|128522|1|2|Repair of Elbo part|Y
01|128536|2|1|**External Coolant only|Y
01|128567|1|1|PROMOTION-WINTER - $1000 Shrink Fit Tooling Credit|Y
01|128567|2|1|Included with START2 Unit|Y
01|128571|1|1|Projection: 105mm/4.13|Y
01|128571|3|1|Projection: 150mm/5.90|Y
01|128571|5|1|Projection: 44.45mm/1.75|Y
01|128577|6|1|Cable quoted for part/quantity information only|Y
01|128592|1|1|Pricing may be subject to an increase in 2020|Y
01|128601|4|1|Scale Mounting Kit|Y
01|128601|5|1|Custom 2-Port Rotary Joint|Y
01|128601|6|1|Custom 5M Cable Set|Y
01|128607|1|1|Live Center part # PHA170RB191210B01|Y
01|128607|2|1|Live Center part # PHA150RB191202B01|Y
01|128613|1|1|This item is considered special once an order is|Y
01|128613|1|2|placed it cannot be cancelled or returned.|Y
01|128614|1|1|Repair of Rotary Table CNC250FA s/n: 3121|Y
01|128614|1|2|TAR-54719|Y
01|128614|3|1|Motor Cable Set|Y
01|128614|3|2|Lyndex Nikken will provide plastic conduit cables as we|Y
01|128614|3|3|do not provide steel braided cables.|Y
01|128615|1|1|Customer will make their own Positioning Block|Y
01|128630|4|1|new part#|Y
01|128630|9|1|*alternative - slotted in stock|Y
01|128638|1|1|Repair of CNC250FA-H s/n: 3123|Y
01|128638|1|2|TAR-54731|Y
01|128638|3|1|Cable Set|Y
01|128638|3|2|Lyndex Nikken will provide plastic conduit cables as we|Y
01|128638|3|3|do not provide steel braided cables.|Y
01|128663|1|1|old part# CAT40-MMC8C-125U-A|Y
01|128670|1|1|Core trade-in discount|Y
01|128672|3|1|Installation of Rotary Table|Y
01|128672|3|2|Travel/Labor Time Hardware Cables Amplifier|Y
01|128672|3|3|Machine Dealer's repsonsibility for any additional|Y
01|128672|3|4|options on machine that need to be activated.|Y
01|128676|1|1|Tooling Certificate Number:|Y
01|128680|1|1|HSK63A-SLS16-80 16mm Side Lock HolderETA 2 wks after|Y
01|128680|1|2|receipt of order.Item is considered a 'special' and|Y
01|128680|1|3|will not be cancelable nor returnable once ordered|Y
01|128680|1|4|Pricing is NET price|Y
01|128690|8|1|Please note: L-N drill chucks only have up to 1/2|Y
01|128690|8|2|capacity.|Y
01|128698|1|1|Drawing will need to be approved by PSI prior to order|Y
01|128698|1|2|Price for 1-2 pieces|Y
01|128698|2|1|Must order 3 or more pieces on the same order|Y
01|128704|1|1|DISCOUNTED REPLACEMENT USING EXISITING CABLING AND|Y
01|128704|1|2|MOTORS. SET UP IDENTICAL TO s/n: 5570(UNREPAIRABLE)|Y
01|128704|1|3|COMPLETION TO BE SHIPPED 1 WEEK ARO|Y
01|128718|1|1|Please Note; Discount relects non returnable item.|Y
01|128718|2|1|Price reflects standard discount|Y
01|128718|2|2|Item listed for pricing only|Y
01|128718|3|1|Price reflects one-time discount for test|Y
01|128718|4|1|Covers 5/16|Y
01|128718|5|1|Covers 3/16|Y
01|128718|6|1|Covers 1/8|Y
01|128723|1|1|Reference RGA# LVR-54804|Y
01|128723|1|2|Repair of 1 x MZQT5-MI63Z-C s/n: 42627 02|Y
01|128723|1|3|(Mimatic# 124878)|Y
01|128723|2|1|Bearings seals and o-rings to be replaced.|Y
01|128723|2|2|Resurface MI63 Spindle|Y
01|128723|4|1|Repair of 1 x MZQT5-MI63Z-C s/n: 42627 03|Y
01|128723|4|2|(Mimatic# 124878)|Y
01|128723|5|1|Bearings seals and o-rings to be replaced.|Y
01|128723|5|2|Resurface MI63 Spindle|Y
01|128724|1|1|Special one time pricing.Future orders will be at|Y
01|128724|1|2|standard list price and discounting|Y
01|128725|1|1|external coolant /ref. 133756|Y
01|128725|2|1|Internal coolant and can run dry/ ref. 133736|Y
01|128726|4|1|Quoted as an in stock alternative.|Y
01|128752|1|1|This is a Special Item non cancelable non returnable|Y
01|128756|1|1|Cable set for 5AX-130FA-M|Y
01|128756|2|1|Priced as NET - Help solve customer needs|Y
01|128764|1|1|old part# CAT40-MMC8C-125U-A|Y
01|128805|1|1|Balance 2-3 Weeks|Y
01|128830|3|1|includes bolts to hold wedge in place|Y
01|128842|1|1|Balance 2-3 Weeks|Y
01|128847|27|1|020-SPAN is the wrench for this holder and is quoted|Y
01|128847|27|2|above|Y
01|128847|28|1|025-SPAN is the wrench for this holder already quoted|Y
01|128847|28|2|above|Y
01|128847|29|1|032-SPAN is the wrench for this holder already quoted|Y
01|128847|29|2|above|Y
01|128847|73|1|Replaces NC4011-1000-4.00|Y
01|128862|2|1|Installation includes: Drive unit short bar fiber|Y
01|128862|2|2|optic cable communications cable bulkhead cables|Y
01|128862|2|3|parameter changes service time and travel.|Y
01|128877|1|1|10 pieces ETA 1/20 ~1/24|Y
01|128877|1|2|1 piece ETA pending|Y
01|128886|1|1|Includes: Shrink Unit Cooling Unit Induction Rings|Y
01|128886|1|2|Cooling Rings Storage Racks & Holder Pots.|Y
01|128886|2|1|Included with SF-START2-UNIT|Y
01|128908|1|1|Reference RGA# TAR-54680|Y
01|128908|1|2|CNC202LSA3 s/n: 7089|Y
01|128908|33|1|Motor was received with table but we cannot test the|Y
01|128908|33|2|condition of the motor at our facility. However we can|Y
01|128908|33|3|provide a separate quote for a replacement motor.|Y
01|128915|1|1|Price reflects Net charge|Y
01|128915|1|2|Chip hole Chip BIS-C-122-04/L Installation|Y
01|128925|1|1|CAT45 END MILL HOLDER 3/8 EM - 2.81 GL|Y
01|128925|1|2|THIS IS A ROUGH ESTIMATE - PRICE COULD CHANGE|Y
01|128925|1|3|AFTER|N
01|128925|3|1|CAT45 3/8 EM HOLDER 2.81 GAUGE LENGTH|Y
01|128925|3|2|THIS IS A ROUGH ESTIMATE ONLY|Y
01|128928|1|1|This a Special Item non cancelable and non returnable|Y
01|128928|1|2|Price for 1-2 pieces ordered|Y
01|128928|2|1|This a Special Item non cancelable and non returnable|Y
01|128928|2|2|Price for 3-4 pieces ordered|Y
01|128928|3|1|This a Special Item non cancelable and non returnable|Y
01|128928|3|2|Price for 5-9 pieces ordered|Y
01|128928|4|1|This a Special Item non cancelable and non returnable|Y
01|128928|4|2|Price for 10+ pieces ordered|Y
01|128929|2|1|Balance of 1 pc late February|Y
01|128933|1|1|Balance Mid February|Y
01|128948|1|1|non-cancelable non-returnable|Y
01|128952|1|1|SA4082-ER32Z for KIA SKT21LM  ER32 Output/ External|Y
01|128952|1|2|Coolant : Mimatic #A123797|Y
01|128952|2|1|2.SA4082-ER32Z-ICE Live Tool Er32 Output ICE: Internal|Y
01|128952|2|2|Coolant Supply thru spindle & external supply thru|Y
01|128952|2|3|pipes. Mimatic #A124154|Y
01|128955|1|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|128955|2|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|128955|3|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|128955|4|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|128955|5|1|w/ Coolant Tube and Balluff Chip Installed|Y
01|128977|1|1|Includes cable sets.|Y
01|128977|2|1|Includes Haas motor and cable sets|Y
01|128977|2|2|Interface not included.|Y
01|128986|17|1|See wrench options above on lines 2-4|Y
01|128986|19|1|Uses same wrenches as shown on lines 2-4|Y
01|128986|23|1|Uses the same wrenches as on line 2-4|Y
01|128994|14|1|*do not offer corresponding holder|Y
01|129005|1|1|Prices in USD - American Dollars|Y
01|129005|1|2|Delivery Term: EXW Mundelein IL - US|Y
01|129005|1|3|Payment Term: Prepayment on Proforma Invoice|Y
01|129009|1|1|CAT40 Blank Bar (D)125mm (L)150mm|Y
01|129009|1|2|3 PC Pricing|Y
01|129009|2|1|CAT40 Blank Bar (D)125mm (L)150mm|Y
01|129009|2|2|6 PC Pricing|Y
01|129009|3|1|CAT40 Blank Bar (D)125mm (L)150mm|Y
01|129009|3|2|9 PC Pricing|Y
01|129009|4|1|CAT40 Blank Bar (D)125mm (L)150mm|Y
01|129009|4|2|12 PC Pricing|Y
01|129009|5|1|CAT40 Blank Bar (D)125mm (L)150mm|Y
01|129009|5|2|15 PC Pricing|Y
01|129009|6|1|CAT40 Blank Bar (D)125mm (L)150mm|Y
01|129009|6|2|18 PC Pricing|Y
01|129009|7|1|CAT40 Blank Bar (D)64mm (L)150mm|Y
01|129009|7|2|3 PC Pricing|Y
01|129009|8|1|CAT40 Blank Bar (D)64mm (L)150mm|Y
01|129009|8|2|6 PC Pricing|Y
01|129009|9|1|CAT40 Blank Bar (D)64mm (L)150mm|Y
01|129009|9|2|9 PC Pricing|Y
01|129009|10|1|CAT40 Blank Bar (D)64mm (L)150mm|Y
01|129009|10|2|12 PC Pricing|Y
01|129009|11|1|CAT40 Blank Bar (D)64mm (L)150mm|Y
01|129009|11|2|15 PC Pricing|Y
01|129009|12|1|CAT40 Blank Bar (D)64mm (L)150mm|Y
01|129009|12|2|18 PC Pricing|Y
01|129009|13|1|CAT40 Blank Bar (D)64mm (L)250mm|Y
01|129009|13|2|3 PC Pricing|Y
01|129009|14|1|CAT40 Blank Bar (D)64mm (L)250mm|Y
01|129009|14|2|6 Pc Pricing|Y
01|129009|15|1|CAT40 Blank Bar (D)64mm (L)250mm|Y
01|129009|15|2|9 PC Pricing|Y
01|129009|16|1|CAT40 Blank Bar (D)64mm (L)250mm|Y
01|129009|16|2|12 PC Pricing|Y
01|129009|17|1|CAT40 Blank Bar (D)64mm (L)250mm|Y
01|129009|17|2|15 PC Pricing|Y
01|129009|18|1|CAT40 Blank Bar (D)64mm (L)250mm|Y
01|129009|18|2|18 PC Pricing|Y
01|129009|19|1|CAT40 Blank Bar (D)60mm (L)350mm|Y
01|129009|19|2|3 PC Pricing|Y
01|129009|20|1|CAT40 Blank Bar (D)60mm (L)350mm|Y
01|129009|20|2|6 PC Pricing|Y
01|129009|21|1|CAT40 Blank Bar (D)60mm (L)350mm|Y
01|129009|21|2|9 Pc Pricing|Y
01|129009|22|1|CAT40 Blank Bar (D)60mm (L)350mm|Y
01|129009|22|2|12 PC Pricing|Y
01|129009|23|1|CAT40 Blank Bar (D)60mm (L)350mm|Y
01|129009|23|2|15 PC Pricing|Y
01|129009|24|1|CAT40 Blank Bar (D)60mm (L)350mm|Y
01|129009|24|2|18 Pc Pricing|Y
01|129013|1|1|Includes Cables|Y
01|129013|1|2|Demo Table|Y
01|129024|2|1|Rotary Table Cables.|Y
01|129024|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|129024|3|2|External Cableds Service Time & Travel.|Y
01|129053|1|1|Reference RGA# TAR-54680|Y
01|129053|1|2|CNC202LSA3 s/n: 7089|Y
01|129056|1|1|INCLUDES MOTORS AND CABLES|Y
01|129061|3|1|Cover to have standard Fanuc Bulkhead Plate|Y
01|129061|5|1|Replacement Motor Gear (Can use existing if needed)|Y
01|129069|1|1|Tooling Certificate Number: 13687-2131-101018|Y
01|129071|11|1|$ 1000 LYNDEX NIKKEN TOOL CERT WITH EACH TABLE|Y
01|129077|1|1|500MM rotary table for horizontal with special face|Y
01|129077|1|2|plate setup for Allen Bradley motor provided by Honda|Y
01|129077|2|1|8+1 Flat type rotary joint for CNC503H|Y
01|129077|3|1|Air Freight Charges from Japan|Y
01|129077|4|1|500MM rotary table with special face plate setup for|Y
01|129077|4|2|Allen Bradley motor provided by Honda|Y
01|129077|5|1|8+1 port rotary union for CNC501T|Y
01|129077|6|1|Air Freight Charges from Japan|Y
01|129077|7|1|500MM support table with special face plate|Y
01|129077|8|1|Air Freight Charges from Japan|Y
01|129077|9|1|400MM rotary table with special face plate setup for|Y
01|129077|9|2|Allen Bradley motor to be provided by Honda|Y
01|129077|10|1|RN-CN401SD-8+1 rotary joint|Y
01|129077|12|1|320MM support table with special face plate|Y
01|129080|1|1|GN30K|Y
01|129080|1|2|Presetter Master gauge BT30/ISO30|Y
01|129080|1|3|Quoted as net pricing no cancelable no returnable|Y
01|129106|1|1|x 3 PCS ETA 02/10|Y
01|129109|3|1|This is considered special and cannot be returned.|Y
01|129109|4|1|This is considered special and cannot be returned.|Y
01|129111|1|1|Repair for AA21-750W Controller|Y
01|129111|1|2|CNCZ100-2W SN: 9127|Y
01|129111|1|3|4001 Alarm - had to reset Motion Pack circuit board|Y
01|129112|1|1|Reference RGA# TOR-54852|Y
01|129112|1|2|Repairing 1 x PF-2|Y
01|129112|4|1|Calibration service included|Y
01|129126|2|1|21/64|Y
01|129126|7|1|9/64|Y
01|129126|8|1|13/64|Y
01|129126|12|1|11/64|Y
01|129126|13|1|15/64|Y
01|129126|17|1|This is too big for ER16 so I added this size to ER20|Y
01|129133|2|1|coolant thru version|Y
01|129143|1|1|ER32 Extension will be added in house and shipped|Y
01|129143|1|2|as one piece|Y
01|129145|3|1|Adapter Plate for Schunk KPS-160 Vise|Y
01|129150|2|1|Includes Installation Drive Units Bulkhead Cables|Y
01|129150|2|2|External Cables Service Time & Travel.|Y
01|129159|1|1|Reference RGA# LVR-54712|Y
01|129159|1|2|Repair of MZQT5-ER40Z-C s/n: 33491 01|Y
01|129159|1|3|(Mimatic# 124877)|Y
01|129159|2|1|Bearings seals o-rings and diamond location pin|Y
01|129159|2|2|to be replaced.|Y
01|129159|4|1|Repair of MZQT5-ER40X-OFF-ICE s/n:48285 01|Y
01|129159|4|2|(Mimatic# 123690)|Y
01|129159|5|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|129159|5|2|ER40 spindle as needed.|Y
01|129163|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|129181|1|1|34-pcs stock/12 pcs 1~2 Weeks/Bal of 14 pcs 13~14 Weeks|Y
01|129196|3|1|Substitute for the 6mm Hydraulic which is NA|Y
01|129197|2|1|Alternate option with quicker lead time|Y
01|129201|2|1|Lyndex-Nikken to make block.|Y
01|129201|2|2|Delivery is from receipt of spindle darwing info|Y
01|129201|2|3|*net price to KM|Y
01|129228|1|1|Item is non standard stock special and will not be|Y
01|129228|1|2|cancelable nor returnable once order is polaced|Y
01|129243|1|1|*5pc MIN|Y
01|129243|5|1|*5pc MIN|Y
01|129243|6|1|*5pc MIN|Y
01|129243|7|1|*5pc MIN|Y
01|129243|10|1|*5pc MIN|Y
01|129243|11|1|*5pc MIN|Y
01|129243|13|1|*5pc MIN|Y
01|129251|4|1|Includes drive unit external cables interface cables|Y
01|129251|4|2|short bar fiber optic cable communications cable|Y
01|129251|4|3|travel labor expenses|Y
01|129257|1|1|CAT40-TB1.3/4-200 CAT40 Testbar with 200mm Gage Length|Y
01|129257|1|2|With Flange/Wooden Case|Y
01|129257|1|3|Quoted at Net Price|Y
01|129257|3|1|CAT40-TB1.3/4-200NF CAT40 Testbar with 200mm Gage Ltg|Y
01|129257|3|2|No Flange Type/In Wooden Case|Y
01|129257|3|3|Quoted at Net Price|Y
01|129258|1|1|Minimum 5 piece order.|Y
01|129259|11|1|Knob promo 5$/holder|Y
01|129287|14|1|wrench for stubby: C40S7-0032-1.10R|Y
01|129287|16|1|wrench for ER32 collet chuck w/ 3.13 and 5|Y
01|129290|3|1|Installation includes: drive unit short bar fiber|Y
01|129290|3|2|optic cables communication cables bulk head cable|Y
01|129290|3|3|set external cable set parameter changes service|Y
01|129290|3|4|time and travel|Y
01|129322|3|1|Please Note: SK25-15A 15mm on size collet. This is|Y
01|129322|3|2|special. Once a purchase order is placed it cannot|Y
01|129322|3|3|be cancelled or returned.Minimum order 5 pieces.|Y
01|129324|3|1|On backorderpending delivery|Y
01|129324|17|1|See wrench options above on lines 2-4|Y
01|129324|19|1|Uses same wrenches as shown on lines 2-4|Y
01|129324|23|1|Uses the same wrenches as on line 2-4|Y
01|129348|1|1|T0012|Y
01|129348|2|1|T0100|Y
01|129348|3|1|T0118|Y
01|129348|4|1|T0129|Y
01|129348|6|1|T0178|Y
01|129348|7|1|T0238|Y
01|129348|8|1|T0313|Y
01|129348|9|1|T0378|Y
01|129348|10|1|T0417|Y
01|129348|11|1|T0488|Y
01|129348|13|1|T0507|Y
01|129348|14|1|T0508|Y
01|129348|15|1|T0522|Y
01|129348|16|1|T0524|Y
01|129348|17|1|T0525|Y
01|129348|18|1|T0528|Y
01|129348|19|1|T0529|Y
01|129348|20|1|T0631|Y
01|129348|21|1|T0633|Y
01|129348|22|1|T0638|Y
01|129348|23|1|T0667|Y
01|129348|24|1|T0671|Y
01|129348|25|1|T0702|Y
01|129348|26|1|T0721|Y
01|129348|27|1|T0722|Y
01|129348|28|1|T0724|Y
01|129348|29|1|T0725|Y
01|129348|30|1|T0727|Y
01|129350|1|1|4 Sets - 6 WEEKS; 3 Sets - Approx 14 Weeks|Y
01|129362|1|1|Reference RGA# TAR-54857|Y
01|129362|1|2|5AX-130 s/n: 1840|Y
01|129400|1|1|Reference RGA# TAR-54863|Y
01|129400|1|2|CNC200MA s/n: N/A|Y
01|129400|21|1|Wire Harness|Y
01|129400|22|1|Price To Rebuild Motor|Y
01|129415|3|1|Quoted as NET pricing|Y
01|129415|3|2|Non-returnablenon-cancelabl|Y
01|129415|12|1|Net Charge|Y
01|129438|2|1|Includes Installation Drive Units Bulkhead Cables|Y
01|129438|2|2|External Cables Service Time & Travel.|Y
01|129445|1|1|Price is at NET to offer special quantity break price|Y
01|129452|1|1|Net price reflects purchase of one cylinder.|Y
01|129452|2|1|Net price reflects purchase of two cylinders.|Y
01|129457|1|1|Shortest available length and closest to 3|Y
01|129457|2|1|Shortest available length and closest to 3|Y
01|129465|67|1|BT40-SK16-105|Y
01|129465|68|1|BT40-SK20-120|Y
01|129465|69|1|BT40-SK20-90|Y
01|129465|70|1|K22-SK6-130|Y
01|129465|71|1|K22-SK6-120|Y
01|129471|2|1|Hard Balance customer's purchased BT30 SMH holder w/|Y
01|129471|2|2|customer's provided Mitsubishi facemill#WSX445UR0204AA|Y
01|129471|2|3|Ref. RGA# MOD-54934|Y
01|129478|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|129483|3|1|Includes: drive amp bulk head cable set external|Y
01|129483|3|2|cable set fiber optic cable communication cable|Y
01|129483|3|3|travel and labor for installation.|Y
01|129483|3|4|BASED UP PERFORMING ALL 3 INSTALLATION AT SAME TIME|Y
01|129489|2|1|NET PRICE|Y
01|129490|1|1|T0012|Y
01|129490|2|1|T0100|Y
01|129490|3|1|T0118|Y
01|129490|4|1|T0129|Y
01|129490|6|1|T0178|Y
01|129490|7|1|T0238|Y
01|129490|8|1|T0313|Y
01|129490|9|1|T0378|Y
01|129490|10|1|T0417|Y
01|129490|11|1|T0488|Y
01|129490|12|1|NC5001-1000-4.00CP|Y
01|129490|12|2|2Lock TaperPlus NCAT50 1in Face/Shell Mill Holder|Y
01|129490|12|3|With Coolant Ports.|Y
01|129490|12|4|T0506|Y
01|129490|13|1|T0507|Y
01|129490|14|1|T0508|Y
01|129490|15|1|T0522|Y
01|129490|16|1|T0524|Y
01|129490|17|1|T0525|Y
01|129490|18|1|T0528|Y
01|129490|19|1|T0529|Y
01|129490|20|1|T0631|Y
01|129490|21|1|T0633|Y
01|129490|22|1|T0638|Y
01|129490|23|1|T0667|Y
01|129490|24|1|T0671|Y
01|129490|25|1|T0702|Y
01|129490|26|1|T0721|Y
01|129490|27|1|T0722|Y
01|129490|28|1|T0724|Y
01|129490|29|1|T0725|Y
01|129490|30|1|T0727|Y
01|129494|1|1|T0012|Y
01|129494|2|1|T0100|Y
01|129494|3|1|T0118|Y
01|129494|4|1|T0129|Y
01|129494|6|1|T0178|Y
01|129494|7|1|T0238|Y
01|129494|8|1|T0313|Y
01|129494|9|1|T0378|Y
01|129494|10|1|T0417|Y
01|129494|11|1|T0488|Y
01|129494|12|1|NC5001-1000-4.00CP|Y
01|129494|12|2|2Lock TaperPlus NCAT50 1in Face/Shell Mill Holder|Y
01|129494|12|3|With Coolant Ports.|Y
01|129494|12|4|T0506|Y
01|129494|13|1|T0507|Y
01|129494|14|1|T0508|Y
01|129494|15|1|T0522|Y
01|129494|16|1|T0524|Y
01|129494|17|1|T0525|Y
01|129494|18|1|T0528|Y
01|129494|19|1|T0529|Y
01|129494|20|1|T0631|Y
01|129494|21|1|T0633|Y
01|129494|22|1|T0638|Y
01|129494|23|1|T0667|Y
01|129494|24|1|T0671|Y
01|129494|25|1|T0702|Y
01|129494|26|1|T0721|Y
01|129494|27|1|T0722|Y
01|129494|28|1|T0724|Y
01|129494|29|1|T0725|Y
01|129494|30|1|T0727|Y
01|129506|1|1|*5pc MIN|Y
01|129506|5|1|*5pc MIN|Y
01|129506|6|1|*5pc MIN|Y
01|129506|7|1|*5pc MIN|Y
01|129506|10|1|*5pc MIN|Y
01|129506|11|1|*5pc MIN|Y
01|129506|13|1|*5pc MIN|Y
01|129518|1|1|Torque: <3mm -> 7-15 ft/lbs|Y
01|129518|1|2|4-6mm -> 15-22 ft/|Y
01|129561|4|1|T0064|Y
01|129561|5|1|T0100|Y
01|129561|9|1|T0102|Y
01|129561|14|1|T0114|Y
01|129561|19|1|T0178|Y
01|129561|23|1|T0209|Y
01|129561|24|1|T0238|Y
01|129561|25|1|T0264|Y
01|129561|26|1|T0378|Y
01|129561|31|1|T0636|Y
01|129561|32|1|T0638|Y
01|129561|33|1|T647|Y
01|129561|34|1|T0656|Y
01|129561|38|1|T0702|Y
01|129561|42|1|T2000|Y
01|129564|3|1|Random Inspection certificates required.|Y
01|129589|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ON M560V|Y
01|129612|1|1|Cat50 1.1/2 EM Holder with 3.00 Gage Length|Y
01|129612|1|2|Chip Hole with RFID part 1778RW/ Balance holder after|Y
01|129612|1|3|chip installation per drawing.|Y
01|129612|3|1|Cat50 1.1/2 EM Holder with 3.00 Gage Length|Y
01|129612|3|2|Chip Hole Only If GKN installs RFID chip they will|Y
01|129612|3|3|have to re-balance at GKN.|Y
01|129653|1|1|ref. drawing 00048663|Y
01|129653|2|1|ref. drawing 00048663|Y
01|129658|1|1|MOQ 5 pcs|Y
01|129659|1|1|Reference RGA# TOR-54887|Y
01|129659|1|2|Repair of PF-2|Y
01|129659|2|1|Stylus is broken. Need to be replaced.|Y
01|129659|3|1|.064 of runout need to be clibrated within .0008 of|Y
01|129659|3|2|T.I.R. Calibration service is included.|Y
01|129667|10|1|replaces old part# SKN-10BJ(GH)|Y
01|129669|1|1|Prices quoted above include training & installation|Y
01|129669|1|2|of 8 hours.  once invoice these items may not be|Y
01|129669|1|3|returned. Terms are FOB Mundelein by air ride truck.|Y
01|129673|2|1|1 full set of Rotary Table cables.|Y
01|129673|3|1|Includes Installation Drive Unit Service Time &|Y
01|129673|3|2|Travel.|Y
01|129675|1|1|Reference RGA# QUA-54884|Y
01|129675|1|2|Repair of T10-024|Y
01|129702|1|1|List price subject to change|Y
01|129711|1|1|8092-2518-121719|Y
01|129718|3|1|Cables - Power and Feed for 4th axis|Y
01|129718|5|1|Power and Feed cable set for both axis|Y
01|129722|2|1|Discount based on purchase of 4 pcs|Y
01|129722|4|1|Discount based on purchase of 4 pcs|Y
01|129768|1|1|1 balance due 16-18 weeks|Y
01|129770|5|1|Includes drive unit external cables interface cables|Y
01|129770|5|2|short bar fiber optic cable communications cable|Y
01|129770|5|3|travel labor expenses|Y
01|129781|1|1|Reference RGA# TOR-54893|Y
01|129781|1|2|Repair of PF-2|Y
01|129781|17|1|Calibration service included.|Y
01|129784|1|1|*external coolant|Y
01|129784|2|1|*internal coolant and can run dry|Y
01|129784|5|1|*external coolant|Y
01|129784|6|1|*internal coolant and can run dry|Y
01|129794|2|1|5 pcs in stock 1 pc 10-11wks mfg + shipping time|Y
01|129802|4|1|Includes drive unit external cables interface cables|Y
01|129802|4|2|short bar fiber optic cable communications cable|Y
01|129802|4|3|travel labor expenses|Y
01|129804|4|1|Includes drive unit external cables interface cables|Y
01|129804|4|2|short bar fiber optic cable communications cable|Y
01|129804|4|3|travel labor expenses|Y
01|129805|2|1|INCLUDES HAAS MOTOR AND CABLES|Y
01|129840|1|1|Tooling Certificate Number: 7585-807D-061716|Y
01|129863|2|1|Offered this as in stock version|Y
01|129894|1|1|Lyndex-Nikken new part #C4001-0750-4.00CP|Y
01|129898|1|1|ref FE100.020.050|Y
01|129898|2|1|ref FE100.060.120|Y
01|129902|1|1|Installation of 5AX-201YA SN: 5778|Y
01|129902|1|2|On Haas NGC New Machine|Y
01|129902|1|3|Includes Cable/Air Hookup Parameters and Test Run|Y
01|129902|3|1|Gas + Mileage|Y
01|129909|3|1|Random Inspection certificates required.|Y
01|129910|1|1|Cat50 1.1/2 EM Holder with 3.00 Gage Length|Y
01|129910|1|2|Chip Hole with RFID part 1778RW/ Balance holder after|Y
01|129910|1|3|chip installation per drawing.|Y
01|129910|3|1|Cat50 1.1/2 EM Holder with 3.00 Gage Length|Y
01|129910|3|2|Chip Hole OnlyIf GKN installs RFID chip they will|Y
01|129910|3|3|have to re-balance at GKN.|Y
01|129951|4|1|Less lead time option to item above|Y
01|129967|1|1|P/N: BT30-SK10-45P special without Drive Keys|Y
01|129969|1|1|MT#3|Y
01|129969|2|1|Will include fittings & Airlines|Y
01|129993|6|1|*** Face plate modification to item above approx. ***|Y
01|130007|1|1|HSK63A 3/8 Shrink Fit Holder Pre-Balanced w/ID Chip|Y
01|130007|1|2|H63A-SF0375-5.12|Y
01|130007|4|1|H63A-SF0375-3.35 >>23 stockH63A-SF0375-3.35CP 10 stock|Y
01|130007|4|2|H63A-SF0375-3.35 >> 22 pcs mid Feb|Y
01|130007|4|3|H63A-SF0375-3.35 >> 95 pcs mid March|Y
01|130021|1|1|Tooling Certificate Number: 25000-2194-010719RT|Y
01|130027|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|130035|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|130035|4|2|AT NO COST TO MRT.|Y
01|130065|2|1|conversion to OSP4 includeds: Motor cover motor gear|Y
01|130065|2|2|servo motor wire harness gear box solenoid|Y
01|130065|2|3|pressure switch and labor.|Y
01|130073|1|1|Delivery: 10 stock L-N/ 6 1~2 Weeks / Bal 8~9 Weeks|Y
01|130077|2|1|Angle plate for CNC1600TOS for vertical use|Y
01|130077|2|2|Special Order. Unit Price Each.|Y
01|130077|2|3|Angle plate set up by Customer|Y
01|130077|3|1|Scale Kit MagnaScale Parts# RU77|Y
01|130077|3|2|includes Scale Scale monunt kit Cover and Int.wiring|Y
01|130077|3|3|Special Order. Unit Price Each.|Y
01|130077|4|1|Scale Kit Heidenhain RON 886|Y
01|130077|4|2|includes Scale Scale monunt kit Cover and Int.wiring|Y
01|130077|4|3|Special Order. Unit Price Each.|Y
01|130077|5|1|Installation(with Toshiba Assistance) includes entering|Y
01|130077|5|2|Rotary table parameters set up Lyndex hydraulic pump|Y
01|130077|5|3|& hoses Rotary table cable management travel labor|Y
01|130077|5|4|expenses.  ***Toshiba Machine provide Motor Amp &|Y
01|130077|5|5|Interface Arrangements.|Y
01|130117|12|1|**5pc min required|Y
01|130128|2|1|New Part number to the Disc S1005-0875-9.05|Y
01|130131|2|1|Installation includes: Drive unit short bar fiber|Y
01|130131|2|2|optic cable communications cable bulkhead cables|Y
01|130131|2|3|external cables parameter changes service time and|Y
01|130131|2|4|travel.|Y
01|130133|5|1|Hoses and Fitting|Y
01|130156|1|1|With Back Plate for A2-8 Spindle Nose for 12 Chuck|Y
01|130156|1|2|New Part Number : HW-12-XLS-A8|Y
01|130156|1|3|Estimated Weight: 160-LBS|Y
01|130156|4|1|With Back Plate for A2-8 Spindle Nose for 10 Chuck|Y
01|130156|4|2|New Part Number : HW-10-XLS-A8|Y
01|130156|4|3|Estimated Weight: 100-LBS|Y
01|130179|1|1|unit price per unit.|Y
01|130179|1|2|not cancelable due to special order once PO issued|Y
01|130196|4|1|- 8 2-jaw chuck w/ hydraulic cylinder|Y
01|130196|4|2|- ported rotary table spindle adapter|Y
01|130196|4|3|- set of jaws|Y
01|130213|1|1|HFO Tampa to supply correct motors|Y
01|130213|1|2|HFO Tampa to supply cables|Y
01|130213|1|3|CONSIGNMENT FOR TRIDENT HFO SHOWROOM|Y
01|130221|1|1|For dry run use or with external coolant|Y
01|130221|2|1|Can be used dry or with internal coolant|Y
01|130221|4|1|#MZQT47-ERZ-HSMazak Live Z-axis Hor 90deg ER32 <H-Type|Y
01|130221|4|2|1:2 Ratio RPM Max:6500 Input13000 Output|Y
01|130224|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|130224|1|2|10 PC Minimum|Y
01|130233|17|1|EQUIVALENT FOR 3/32 COLLET (RANGE 0.090-0.098)|Y
01|130245|2|1|Enginerring Modifies Draw Screw to spec from customer|Y
01|130245|2|2|machine info they provide|Y
01|130247|17|1|EQUIVALENT FOR 3/32 COLLET (RANGE 0.090-0.098)|Y
01|130256|1|1|NCAT40-HC10-80|Y
01|130256|1|2|2Lock TaperPlus NCAT40 Hydraulic Chuck 10mm GL80mm|Y
01|130256|1|3|Quoted as net pricing|Y
01|130270|1|1|1-199 pc Price|Y
01|130270|1|2|Price is a NET price|Y
01|130270|2|1|101-299 pc price if all are ordered at the same time|Y
01|130270|2|2|We will allow breaking the quantity into 2 different|Y
01|130270|2|3|ship dates|Y
01|130270|2|4|Price is a NET price|Y
01|130295|1|1|SPECIAL NET PRICING - 1 TIME PURCHASE|Y
01|130296|5|1|Installation includes: Drive unit short bar fiber|Y
01|130296|5|2|optic cable communications cable bulkhead cables|Y
01|130296|5|3|external cables parameter changes service time and|Y
01|130296|5|4|travel.|Y
01|130296|5|5|Also modificaiton to machine to route cables.|Y
01|130312|1|1|Reference RGA# CUR-54880|Y
01|130312|1|2|Repair of C40RAM-ER32-180-65TP s/n: 19902693 01|Y
01|130312|1|3|(Mimatic# 178108)|Y
01|130312|2|1|Bearings seals and o-rings to be replaced.|Y
01|130319|1|1|*Net|Y
01|130319|2|1|*Net|Y
01|130319|3|1|*Net|Y
01|130319|5|1|*Net|Y
01|130319|8|1|*Net|Y
01|130334|1|1|Tooling Certificate Number: 13712-2521-121919|Y
01|130345|1|1|Tooling Cert #19992-2519-121919|Y
01|130345|6|1|Lines 2-5 are required for sealed coolant system in 4mm|Y
01|130351|1|1|*** Price Includes Applicable Wrenches ***|Y
01|130359|6|1|This is the shortest length we can offer.|Y
01|130361|1|1|Reference RGA# TOR-54813|Y
01|130361|1|2|Repair of PRE-PART-05PAN|Y
01|130361|1|3|Model: PANVISION E238 s/n: 3392|Y
01|130361|2|1|The parts below need to be replaced.|Y
01|130361|2|2|CPU active components replacement colour LCD|Y
01|130361|2|3|replacementLED LCDLED LCD adaptercablebracket|Y
01|130361|2|4|spacer306V LCD protection|Y
01|130361|3|1|Ship to Elbo Controlli in Italy|Y
01|130361|4|1|Ship from Elbo Controlli in Italy|Y
01|130369|2|1|BT50-SK10-195 is discontinued alternate quoted|Y
01|130369|9|1|alternate to BT50-SK16-195|Y
01|130369|14|1|alternate to BT50-SK25-195|Y
01|130377|5|1|REQUIRED 20MM RISER FOR 300 MM CENTER HEIGHT REQUIRED|Y
01|130377|5|2|LEAD TIME IS FOR THE RISER TO BE MANUFACTURED.|Y
01|130377|5|3|PRICE OF RISER IS INCLUDED|Y
01|130377|7|1|ROTARY INSTALL HARDWARE KIT COST IS NET.|Y
01|130377|7|2|40 AND 80 AMP DRIVE EXTERNAL CABLES FANUC CABLES|Y
01|130377|7|3|FITTINGS CAPS AND AIRLINES|Y
01|130390|5|1|Installation includes: Drive unit short bar fiber|Y
01|130390|5|2|optic cable communications cable bulkhead cables|Y
01|130390|5|3|external cables parameter changes service time and|Y
01|130390|5|4|travel.|Y
01|130390|5|5|Also modificaiton to machine to route cables.|Y
01|130391|1|1|Live Tooling Tool Certificate|Y
01|130409|1|1|Reference RGA# TAR-54886|Y
01|130409|1|2|5AX-200II s/n: 2052|Y
01|130409|2|1|New Rotary Assembly Housing|Y
01|130409|2|2|Price includes new Worm Wheel/Worm Screw|Y
01|130409|2|3|Bearings/Seals/O-Rings/Casting/Spindle|Y
01|130410|1|1|This has internal thread|Y
01|130411|1|1|N5006-0750A-2.781-ID-GKN  UNV#4 NMTB50 3/4 with|Y
01|130411|1|2|2.781 Gage Length RFID Hole Only|Y
01|130418|23|1|KM42-10.3|Y
01|130428|7|1|Bearings/Seals/O-Rings Replaced|Y
01|130428|7|2|** If we take table apart this is bare minimum **|Y
01|130442|1|1|One time test discount applied - non-refundable|Y
01|130442|3|1|One time test discount applied - non-refundable|Y
01|130442|4|1|One time test discount applied - non-refundable|Y
01|130442|6|1|Nut is complementary if sold with standared ER chuck|Y
01|130442|7|1|Nut is complementary if sold with standared ER chuck|Y
01|130442|13|1|ER collet chuck added for pricing|Y
01|130442|14|1|ER collet chuck added for pricing|Y
01|130453|1|1|BMT75-CT40Z-ICE-110|Y
01|130453|1|2|BMT75 LIVE; 90 DEG; CAT40 L1=110mm;|Y
01|130453|1|3|INT/ EXT COOLANT/ 1015 PSI;1:1 GEAR MAX 80Nm;6000RPM|Y
01|130453|1|4|REF DRWG #00056778|Y
01|130453|1|5|APPROVAL DRAWING MUST BE SIGNED PRIOR TO OUR ACCEPTING|Y
01|130453|1|6|AN ORDER AND LEAD TIME STARTS ONCE DRAWING IS APPROVED|Y
01|130453|1|7|PRICING IS NET PRICE BASED ON A 2 PC ORDER|Y
01|130456|20|1|We can sub E40-314>>ER40 8.0mm (.314-.275) Collet|Y
01|130456|20|2|this will hold 5/16. Same price in stock.|Y
01|130463|1|1|Reference RGA# TAR-54811|Y
01|130463|1|2|CNC401BYA-M s/n: 10579|Y
01|130469|5|1|NET PRICING ON BLOCK; ADD YOUR MARGIN TO THIS ITEM|Y
01|130472|1|1|Use 25mm Open End Wrench|Y
01|130496|1|1|This item is non-standard stock & considered a special.|Y
01|130496|1|2|Once a PO is placed it cannot be cancelled or returned.|Y
01|130496|4|1|This item is non-standard stock & considered a special.|Y
01|130496|4|2|Once a PO is placed it cannot be cancelled or returned.|Y
01|130496|5|1|This item is non-standard stock & considered a special.|Y
01|130496|5|2|Once a PO is placed it cannot be cancelled or returned.|Y
01|130500|2|1|135MM CENTER HEIGHT|Y
01|130500|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|130503|1|1|Price includes wrenches - Unit is coolant thru the|Y
01|130503|1|2|block and noth through the spindle|Y
01|130518|1|1|Repair of AA21 Controller|Y
01|130518|1|2|Customer getting 4001 Alarm|Y
01|130518|1|3|Had to do super ram clear to reset circuit board|Y
01|130518|1|4|TAR-54920|Y
01|130521|1|1|CAT40-Q9-95N  Base Holder for Modular Boring head|Y
01|130521|4|1|9-ZMAC 20-40V Modular Boring Head|Y
01|130536|1|1|Tooling Certificate Number: 7585-807D-061716|Y
01|130554|4|1|This is a NET price|Y
01|130556|1|1|C8-SK10-120-J Polygon C8 SK10 Slim Chuck|Y
01|130556|5|1|C8-SK25-120-J  Polygon C8 SK25 Slim Chuck|Y
01|130561|1|1|*** Prepared with pneumatic brake ***|Y
01|130570|2|1|*** YCM NSV102A previously integrated ***|Y
01|130570|2|2|Installation includes: drive unit short bar fiber|Y
01|130570|2|3|optic cables communication cables bulk head cable|Y
01|130570|2|4|set external cable set parameter changes service|Y
01|130570|2|5|time and travel|Y
01|130574|2|1|*** YCM NSV102A previously integrated ***|Y
01|130574|2|2|Installation includes: drive unit short bar fiber|Y
01|130574|2|3|optic cables communication cables bulk head cable|Y
01|130574|2|4|set external cable set parameter changes service|Y
01|130574|2|5|time and travel|Y
01|130579|2|1|Installation includes: drive unit short bar fiber|Y
01|130579|2|2|optic cables communication cables bulk head cable|Y
01|130579|2|3|set external cable set parameter changes service|Y
01|130579|2|4|time and travel|Y
01|130590|1|1|Includes: Table with motor hardwired cables cabinet|Y
01|130590|1|2|cables. Drive unit not included.|Y
01|130614|1|1|Reference RAG# TAR-54811|Y
01|130614|1|2|TAT-400 s/n: 2524|Y
01|130631|2|1|Installation includes: Drive unit short bar fiber|Y
01|130631|2|2|optic cable communications cable bulkhead cables|Y
01|130631|2|3|external cables parameter changes service time and|Y
01|130631|2|4|travel.|Y
01|130631|3|1|5AX-201 with Alpha 21 control for 5th axis positioning|Y
01|130631|3|2|and 4th axis integrated into the machine control.|Y
01|130631|4|1|Installation includes: Drive unit short bar fiber|Y
01|130631|4|2|optic cable communications cable bulkhead cables|Y
01|130631|4|3|external cables parameter changes M-code connection|Y
01|130638|3|1|Installation includes: Bulkhead cables external cables|Y
01|130638|3|2|parameter changes servcie time and travel.|Y
01|130638|4|1|Confirmation switches and cover plate for PBA-170|Y
01|130641|1|1|Includes: 2-CNCZ180LSABR2 tables with KS-SWBOX-SA27|Y
01|130641|1|2|TCE-97910 junction box and cablesB-Master cable set|Y
01|130641|1|3|6B8437001.|Y
01|130650|1|1|WITH MOTORS AND CABLES|Y
01|130650|2|1|WITH MOTORS AND CABLES|Y
01|130652|2|1|Clamp force is 300kg.|Y
01|130652|2|2|Mechanical Draw Bar clamping with any retention knob|Y
01|130656|1|1|Reference RAG# TAR-54811|Y
01|130656|1|2|TAT-400 s/n: 2524|Y
01|130657|1|1|4.7244 GAUGE LENGTH|Y
01|130657|7|1|5.9055 GAUGE LENGTH - SEE PAGE 22 IN BIG BLUE.|Y
01|130657|7|2|THE SK COLLET CHUCK IS THE HIGH GRIPPING FORCE|Y
01|130657|7|3|TOOL THAT I DEMONSTRATED DURING THE TORQUE TEST|Y
01|130662|9|1|Set Screw S1-14X5/8  Flat Bottom|Y
01|130680|1|1|Table is in stock need to confirm Motor Model #|Y
01|130680|1|2|Conversion components may need to be orderd which will|Y
01|130680|1|3|be 4-6 weeks|Y
01|130680|2|1|Heidenhain scale and scale mounting kit|Y
01|130688|2|1|Lyndex-Nikken to make block.|Y
01|130688|2|2|Delivery is from receipt of spindle drawing info|Y
01|130701|1|1|Reference RGA# TOR-54721|Y
01|130701|1|2|Repair of PRE-PART-05PAN|Y
01|130701|1|3|Model: PANVISION E238 s/n: 3384|Y
01|130701|2|1|The parts below need to be replaced.|Y
01|130701|2|2|Colour LCD replacement LED LCD LED LCD adaptercable|Y
01|130701|2|3|bracket spacer and 306V LCD Protection|Y
01|130701|3|1|Ship to Elbo Controlli in Italy|Y
01|130701|4|1|Ship from Elbo Controlli in Italy|Y
01|130710|2|1|NET price|Y
01|130715|5|1|Free with purchase of Shrink Unit|Y
01|130735|18|1|This item is no longer available|Y
01|130735|18|2|EQUIVALENT = P/N: C5011-1500B|Y
01|130735|18|3|This is the same holder with an additional balanceable|Y
01|130735|18|4|feature.|Y
01|130735|18|5|Same pricing as P/N: C5011-1500-4.00 above|Y
01|130735|37|1|Option available:  P/N: C5007-0040B-DIN|Y
01|130752|1|1|Tool Cert #25000-2547-012720|Y
01|130752|7|1|NCAT50-SK10C-195UP|Y
01|130752|7|2|2LK TaperPlus NCAT50 SK10 Slim Chuck/Coolant Hi Speed|Y
01|130752|9|1|NCAT50-SK10-195UP|Y
01|130752|9|2|2LK TaperPlus NCAT50 SK10 Slim Chuck/Coolant Hi Speed|Y
01|130753|1|1|HSK63A Blank Bar (D)105mm (GL)230mm|Y
01|130753|1|2|(4) PC Price|Y
01|130753|1|3|Quoted as NET PricingNon-returnablenon-cancelable|Y
01|130753|2|1|HSK63A Blank Bar (D)108mm (GL)240mm|Y
01|130753|2|2|(4) PC Pricing|Y
01|130753|2|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|130753|3|1|HSK63A Blank Bar (D)115mm (GL)250mm|Y
01|130753|3|2|(4) PC Pricing|Y
01|130753|3|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|130753|5|1|HSK63A Blank Bar (D)105mm (GL)230mm|Y
01|130753|5|2|(8) PC Pricing|Y
01|130753|5|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|130753|6|1|HSK63A Blank Bar (D)108mm (GL)240mm|Y
01|130753|6|2|(8) PC Pricing|Y
01|130753|6|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|130753|7|1|HSK63A Blank Bar (D)115mm (GL)250mm|Y
01|130753|7|2|(8) PC Pricing|Y
01|130753|7|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|130754|2|1|WITH MOTORS AND CABLES|Y
01|130764|1|1|Reference RGA# TOR-54938|Y
01|130764|1|2|Repair of PF-2|Y
01|130764|3|1|Calibration service included.|Y
01|130773|2|1|Installation includes: drive unit short bar fiber|Y
01|130773|2|2|optic cables communication cables bulk head cable|Y
01|130773|2|3|set external cable set parameter changes service|Y
01|130773|2|4|time and travel|Y
01|130773|2|5|*** Awaiting details from the MT builder ***|Y
01|130773|2|6|** Budgetary figure **|Y
01|130780|1|1|Comment for Line#1 item here.  Hiro|Y
01|130780|1|2|2nd INTERNAL comment for PS-16.  Hiro|N
01|130783|1|1|Inspection/disassembly of 5AX-130FA SN: 5561 5567|Y
01|130783|1|2|Tables were found to have no issues|Y
01|130783|1|3|Re-Assembled and tested.|Y
01|130783|1|4|Labor Cost Only|Y
01|130783|1|5|TAR-54606|Y
01|130783|2|1|15 Hours x 2 tables = 30 Hours Total|Y
01|130783|9|1|Standard External Cable Set|Y
01|130783|9|2|** Need to confirm length at time of purchase|Y
01|130787|1|1|part# 124881|Y
01|130787|1|2|Mazak Live Tool H-Type 90-Degree MI63 Modular Quick|Y
01|130787|1|3|**DISPLAY TOOL- w/ full warranty|Y
01|130787|5|1|part# 124881|Y
01|130787|5|2|Mazak Live Tool H-Type 90-degree MI63 Mod Quick Change|Y
01|130787|5|3|NEW|Y
01|130787|6|1|part# 124261|Y
01|130787|6|2|Mazak Live Tool V-Type Straight MI63 Modular Quick Chg|Y
01|130793|4|1|This item is considered special once it's ordered it|Y
01|130793|4|2|cannot be returned|Y
01|130825|1|1|Considered a  non standard stock special.Once ordered|Y
01|130825|1|2|is not cancelable nor returnable|Y
01|130825|2|1|Alternative to the KM7/8-516|Y
01|130825|2|2|Non standard stock not cancelable nor returnable|Y
01|130828|1|1|1 DEGREE INDEXER WITH HIRTH COUPLING|Y
01|130828|1|2|CONFIRMATION OF MACHINE DATA SHEETS WILL BE NEEDED|Y
01|130828|1|3|CONFIRMATION OF PROPER FIT TO MACHINE|Y
01|130828|1|4|LADDER MAY NEED TO BE CHANGED DUE TO 1 DEGREE INDEXING|Y
01|130828|1|5|(360 POSITIONS)|Y
01|130828|2|1|HYD. SOURCE NEEDED FOR BRAKE SYSTEM|Y
01|130828|4|1|EXTERNAL CABLE SET|Y
01|130828|5|1|Includes drive unit bulkhead cables external cables|Y
01|130828|5|2|short bar fiber optic cable communications cable|Y
01|130828|5|3|parameter changes labor travel|Y
01|130831|2|1|This sleeve can be used to reduct the 20mm to a 16mm|Y
01|130864|3|1|Quoted as NET pricing|Y
01|130864|3|2|Non-returnablenon-cancelable|Y
01|130864|12|1|Net Charge|Y
01|130877|17|1|Please Note: Discount reflects a purchase order of|Y
01|130877|17|2|70 knobs. If quantities should change please contact|Y
01|130877|17|3|us for a new quote.|Y
01|130879|1|1|Tooling Certificate Number:|Y
01|130884|1|1|Tooling Certificate #TBA upon purchase|Y
01|130892|5|1|CAT50-SF0500-3.75CP|Y
01|130892|9|1|CAT50-SF0750-3.75CP|Y
01|130892|13|1|CAT50-SF1000-4.00CP|Y
01|130905|1|1|The standard wrench is included and is a Allen6 wrench|Y
01|130905|1|2|This holder draws in from the side screw|Y
01|130925|1|1|Includes (2)CAT40 Holder Pots|Y
01|130938|2|1|Cable set for CNC180OSP4|Y
01|130940|2|1|Cable set for CNC202OSP4|Y
01|130944|1|1|Tooling Certificate Number:|Y
01|131009|3|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|131012|1|1|Air Brake Table AB|Y
01|131012|7|1|INSTALLATION INCLUDES: SERVO MOTORS & DRIVES FOR|Y
01|131012|7|2|4TH/5TH AXES ON DOOSA 4500 MACHINING CENTER|Y
01|131012|7|3|BULKHEAD CONNECTORS LABOR FOR INSTALLATION &|Y
01|131012|7|4|TRAVEL/LODGING EXPENSES FOR LYNDEX NIKKEN|Y
01|131012|7|5|INSTALL TECHNICIAN|Y
01|131022|4|1|Collet for 12mm drill (.472) collet range is .484-.469|Y
01|131022|4|2|the 12mm coolant collet is out of stock.|Y
01|131022|8|1|no need for coolant disk|Y
01|131022|9|1|no need for coolant disk|Y
01|131022|13|1|Telios Needs RGA to exchange qty2 NCAT40-C1-105U-IDU|Y
01|131022|13|2|AND QTY 2 KM1-1/2|Y
01|131022|14|1|CUSTOMER RECEIVED INCORRECT PART RGA# IPS55020|Y
01|131022|14|2|telios needs to send VMK8-6 back to LN|Y
01|131022|14|4|Also customer needs rga for qty 1 CAT40-MMC8C-90U-IDU|Y
01|131022|14|5|AND QTY 1 VMK8-3/16|Y
01|131024|4|1|Collet for 12mm drill (.472) collet range is .484-.469|Y
01|131024|4|2|the 12mm coolant collet is out of stock.|Y
01|131024|8|1|no need for coolant disk|Y
01|131024|9|1|no need for coolant disk|Y
01|131024|13|1|Telios Needs RGA to exchange qty2 NCAT40-C1-105U-IDU|Y
01|131024|13|2|AND QTY 2 KM1-1/2|Y
01|131024|14|1|CUSTOMER RECEIVED INCORRECT PART RGA# IPS55020|Y
01|131024|14|2|telios needs to send VMK8-6 back to LN|Y
01|131024|14|4|Also customer needs rga for qty 1 CAT40-MMC8C-90U-IDU|Y
01|131024|14|5|AND QTY 1 VMK8-3/16|Y
01|131026|2|1|Installation includes: drive unit short bar fiber|Y
01|131026|2|2|optic cables communication cables bulk head cable|Y
01|131026|2|3|set external cable set parameter changes service|Y
01|131026|2|4|time and travel|Y
01|131026|2|5|*** Awaiting details from the MT builder ***|Y
01|131026|2|6|** Budgetary figure **|Y
01|131036|1|1|Non standard stock item cannot be canceled or returned|Y
01|131036|1|2|once ordered|Y
01|131050|1|1|Installation includes: Drive unit short bar fiber|Y
01|131050|1|2|optic cables communications cable bulkhead cables|Y
01|131050|1|3|external cables parameter changes service time and|Y
01|131050|1|4|travel.|Y
01|131050|4|1|Table conversion if required: Motor solenoid|Y
01|131050|4|2|wireharness labour.|Y
01|131073|1|1|CNC202 with Fanuc A3/3000 motor|Y
01|131104|1|1|Please note; The BT40-UMT200W is non standard stock.|Y
01|131104|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|131104|1|3|or returned.|Y
01|131112|3|1|Includes: Bulk Head Cables External Cables Parameter|Y
01|131112|3|2|changes service time & travel|Y
01|131112|3|3|USING EXISTING DMG MORI DDR UNIT|Y
01|131112|7|1|Includes: Dual axis drive short bar fiber optic cable|Y
01|131112|7|2|communications cables bulk head cables external cable|Y
01|131112|7|3|parameter changes service time & travel|Y
01|131118|1|1|Shrink Fit Package Consists of Shrink Fit Machine +|Y
01|131118|1|2|10 CAT40 Taper Shrink Fit Holders with Coolant Ports|Y
01|131134|2|1|1 full set of Cables|Y
01|131134|3|1|Installation includes: optic cables communication|Y
01|131134|3|2|cables parameter changes service time and travel.|Y
01|131148|20|1|This is the same as the line above please confirm|Y
01|131160|2|1|Includes external cable set drive & I/F|Y
01|131160|2|2|Please confirm 4th axis software/parameters and 2 spare|Y
01|131160|2|3|m-codes are presont on machine control at time of|Y
01|131160|2|4|installation|Y
01|131189|4|1|3.150 (80mm) Length|Y
01|131189|5|1|4.724 (120mm) Length|Y
01|131189|12|1|3.937 (100mm) Length|Y
01|131189|13|1|4.724 (120mm) Length|Y
01|131196|1|1|Customer has a CNC260FA-M SN: 6340 they would like to|Y
01|131196|1|2|send in for evaluation/repair during their machine|Y
01|131196|1|3|shutdown. Reference RGA# TAR-55093. This quote is for|Y
01|131196|1|4|budgetary purposes.|Y
01|131215|3|1|INSTALLATION INCLUDES: 4TH/5TH AXIS DRIVES BULKHEAD|Y
01|131215|3|2|CABLING AND CONNECTORS TRAVEL/LODGING EXPENSES|Y
01|131215|3|3|FOR LYNDEX NIKKEN SERVICE TECHNICIAN.|Y
01|131215|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|131218|9|1|Offering this shorter length as in stock alternative|Y
01|131221|1|1|Reference RGA# TAR-55034|Y
01|131221|1|2|CNCZ202LFA s/n: 20090TC|Y
01|131224|1|1|Tooling Cert # 20878-2560-21020|Y
01|131264|2|1|**YCM|Y
01|131264|3|1|*AWEA|Y
01|131264|4|1|AWEA*|Y
01|131264|6|1|*YCM|Y
01|131265|4|1|*if required|Y
01|131319|2|1|External Cable Set for one side of the pallet|Y
01|131326|2|1|$700 Net Charge for Lyndex Nikken to Make Block|Y
01|131326|2|2|Positioning Block can be made by the customer or|Y
01|131326|2|3|Lyndex can design at reduced charge.|Y
01|131326|2|4|Spindle Face Drawing Required for Manufacture of|Y
01|131326|2|5|Positioning Block|Y
01|131340|2|1|CABLE MANAGEMENT SWING BOX. ALLOWS ROTATION OF B AXIS|Y
01|131340|3|1|EXTENDED LENGTH EXTERNAL POWER AND FEEDBACK CABLE SET|Y
01|131340|4|1|PRICE IS NET TO DMG MORI|Y
01|131340|4|2|PRICE INCLUDES TRAVEL EXPENSES SERVO AMPS AND|Y
01|131340|4|3|REQUIRED CABLE MANAGEMENT COMPONENTS.|Y
01|131346|5|1|Installation includes: Drive unit short bar fiber|Y
01|131346|5|2|optic cable communications cable bulkhead cables|Y
01|131346|5|3|external cables parameter changes service time and|Y
01|131346|5|4|travel.|Y
01|131346|5|5|Also modificaiton to machine to route cables.|Y
01|131347|5|1|Installation includes: Drive unit short bar fiber|Y
01|131347|5|2|optic cable communications cable bulkhead cables|Y
01|131347|5|3|external cables parameter changes service time and|Y
01|131347|5|4|travel.|Y
01|131347|5|5|Also modificaiton to machine to route cables.|Y
01|131362|4|1|Installation includes: Drive unit short bar fiber|Y
01|131362|4|2|optic cables communications cablebulkhead cables|Y
01|131362|4|3|external cables parmeter changes service time and|Y
01|131362|4|4|travel.|Y
01|131366|3|1|TCD-A3049|Y
01|131376|1|1|Reference RGA# CUR-55004|Y
01|131376|1|2|Repair of 1 x C50RAM-ER25-215ST-110TP s/n: 82623 01|Y
01|131376|1|3|(Mim# 184454)|Y
01|131376|2|1|Bearings seals o-rings and gears along with output|Y
01|131376|2|2|spindle to be replaced.|Y
01|131398|1|1|Reference RGA# TAR-55034|Y
01|131398|1|2|CNC250BFA s/n: 3519|Y
01|131398|18|1|Seal:Part# CN252B030|Y
01|131400|2|1|Installation includes: drive unit short bar fiber|Y
01|131400|2|2|optic cables communication cables bulk head cable|Y
01|131400|2|3|set external cable set parameter changes service|Y
01|131400|2|4|time and travel|Y
01|131408|1|1|Reference RGA# CUR-54971|Y
01|131408|1|2|Repair of C40RA-0025M s/n: 18902340 01|Y
01|131408|1|3|(Mimatic# 175241)|Y
01|131408|2|1|Bearings seals o-rings to be replaced. Resurface|Y
01|131408|2|2|spindles as needed.|Y
01|131441|1|1|Contains: (2) Keys & (2) Bolts|Y
01|131441|2|1|Thread size: 3/8-24 - Comes with Arbor and Washer|Y
01|131447|1|1|Reference RGA# 54970|Y
01|131447|1|2|Repair of PF-2|Y
01|131447|8|1|Calibration service is included.|Y
01|131462|2|1|MOQ = 3 pcs|Y
01|131466|1|1|Package consists of:|Y
01|131466|1|2|SF-START2-UNIT-200 Machine w Cooling UnitChuck Holders|Y
01|131466|1|3|5 Piece Induction Ring Set 5 Piece Cooling Bracket Set|Y
01|131466|1|4|10 Standard Shrink Fit Holders in CAT40 w Coolant Ports|Y
01|131482|4|1|H50E-SF8-80 HSK50E 8mm Shrink Fit Holder Pre-Balanced|Y
01|131493|2|1|HW-SJAW-OS-R1466 (3pc=1set)|Y
01|131494|3|1|Installation includes: drive unit short bar fiber|Y
01|131494|3|2|optic cables communication cables bulk head cable|Y
01|131494|3|3|set external cable set parameter changes service|Y
01|131494|3|4|time and travel|Y
01|131497|1|1|5.906 Gauge Length with 1.083 diameter nut|Y
01|131497|1|2|The SK10 Collet Range is .069 thru .394|Y
01|131497|2|1|7.086 Gauge Length 1.083 Nut|Y
01|131500|2|1|Delivery: 3 Stock 7 ETA to L-N 03/25 Balance 7 Weeks|Y
01|131500|2|2|from time of order.|Y
01|131516|1|1|Reference RGA# TAR-55034|Y
01|131516|1|2|Repiar of TAT-170N s/n: 41489B|N
01|131526|1|1|NEW DESIGN 8 TABLE. 33.3RPM WITHOUT FACEPLATE.|Y
01|131526|1|2|909 Nm. BRAKE TORQUE|Y
01|131526|3|1|NEW DESIGN 8 TABLE WITH 8 FACEPLATE. 33.3 RPM|Y
01|131526|3|2|909 Nm. BRAKE TORQUE|Y
01|131526|5|1|NEW HIGH SPEED 8 DESIGN TABLE. 66.6 RPM WITHOUT|Y
01|131526|5|2|FACEPLATE. 909 Nm. BRAKE TORQUE.|Y
01|131526|7|1|NEW HIGH SPEED 8 DESIGN TABLE WITH 8 FACEPLATE.|Y
01|131526|7|2|66.6 RPM WITH 909Nm. BRAKE TORQUE|Y
01|131526|9|1|STANDARD 8 HIGH SPEED ( 44.4 RPM) ALREADY USED AT|Y
01|131526|9|2|KNIGHTS|Y
01|131526|11|1|STANDARD 8 TABLE (22.2 RPM)|Y
01|131526|13|1|STANDARD 10 TABLE|Y
01|131526|15|1|HIGH SPEED 10 TABLE (33.3 RPM)|Y
01|131540|2|1|To be used for the HSK63F Spindle|Y
01|131543|1|1|Tooling Certificate Number: 13687-2371-071119|Y
01|131545|1|1|Tooling Certificate Number:8092-2542-011620|Y
01|131547|1|1|x7 pcs ETA 1-2 weeks|Y
01|131551|2|1|Includes drive unit external cables interface cables|Y
01|131551|2|2|short bar fiber optic cable communications cable|Y
01|131551|2|3|travel labor expenses|Y
01|131563|1|1|N5006-0750A-2.781-ID-GKN  UNV#4 NMTB50 3/4 with|Y
01|131563|1|2|2.781 Gage Length RFID Hole Only|Y
01|131570|1|1|Reference RGA#TAR-55027|Y
01|131570|1|2|5AX-130 s/n: N/A|Y
01|131579|1|1|Extra unit to keep on hand|Y
01|131579|1|2|y|Y
01|131588|2|1|Cannot be cancelled or returned|Y
01|131588|3|1|Cannot be cancelled or returned|Y
01|131593|1|1|Adapter plate for CNCZ204|Y
01|131593|2|1|Adapter plate for CNCZ205|Y
01|131601|9|1|Please Note: Unit must ship via truck. Price reflects|Y
01|131601|9|2|shrink fit unit only.|Y
01|131601|10|1|Pots included in price of SF unit.|Y
01|131601|20|1|Please Note: Price includes 10 free holders BT30 or|Y
01|131601|20|2|NBT30 with the purchase of the SF-START2-UNIT-200.|Y
01|131606|7|1|*** Special one-time price ***|Y
01|131606|8|1|*** Special one-time price ***|Y
01|131608|5|1|Fanuc motor included|Y
01|131610|1|1|CAT45 ER32 holder 6.00 GL|Y
01|131618|1|1|ETA 03/30|Y
01|131649|2|1|Heidenhain +/-3 scale with mounting kit.|Y
01|131649|3|1|Custom cable for scale and encoder|Y
01|131653|6|1|WAITING ON QUOTE FOR CHUCK.  HOPE TO HAVE INFO|Y
01|131653|6|2|TOMORROW|Y
01|131653|7|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|131653|7|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLE|Y
01|131653|7|3|EXTERNAL CABLES PARAMETER CHANGES SERVICE TIME AND|Y
01|131653|7|4|TRAVEL.|Y
01|131655|3|1|100 MM RISER FOR TAILSTOCK.|Y
01|131655|7|1|WAITING FOR QUOTE ON CHUCK SHOULD HAVE IT TOMORROW|Y
01|131655|8|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|131655|8|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|131655|8|3|EXTERNAL CABLES PARAMETER CHANGES SERVICE TIME AND|Y
01|131655|8|4|TRAVEL.|Y
01|131660|2|1|ETA 02/24|Y
01|131673|4|1|This item is considered special once ordered cannot|Y
01|131673|4|2|be cancelled or returned|Y
01|131673|5|1|This item is considered special once ordered cannot|Y
01|131673|5|2|be cancelled or returned|Y
01|131700|1|1|These items are special non cancelable nor returnable|Y
01|131700|1|2|once order is placed|Y
01|131701|1|1|there are 10 in stock in Japan ETA pending on 10|Y
01|131702|2|1|in stock option|Y
01|131702|3|1|in stock option may need collet|Y
01|131707|1|1|AA21-750W controllar interface and M signal cable|Y
01|131707|1|2|included. Pneumatic brake. Mitutoyo color White.|Y
01|131707|1|3|Special Order. Unit Price Each.|Y
01|131707|2|1|6P Rotary Joint (Flange Plate type)|Y
01|131707|3|1|PBA-170  with the change lever and MT4 Socket.|Y
01|131707|3|2|Mitutoyo Color White. Special Order. Unit Price Each.|Y
01|131716|13|1|This is a non-standard stock item and considered|Y
01|131716|13|2|special once an order is placed it cannot be cancelled|Y
01|131716|13|3|or returned.|Y
01|131716|14|1|This is a non-standard stock item and is considered|Y
01|131716|14|2|special. Once an order is placed it cannot be cancelled|Y
01|131716|14|3|or returned.|Y
01|131716|18|1|This is a non-standard stock item and is considered|Y
01|131716|18|2|special. Once an order is placed it cannot be cancelled|Y
01|131716|18|3|or returned.|Y
01|131729|1|1|CAT50-SF0750-5.00-IDKS|Y
01|131729|1|2|UNV_5153|Y
01|131744|1|1|subject to approval|Y
01|131750|5|1|Offered as an alternative to 6.3 GL|Y
01|131752|1|1|Non returnable once run in turret|Y
01|131763|1|1|Installed with PS-N46E at the factory|Y
01|131763|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|131763|2|1|Installed on S-NC5-46-FMA31.75CS-45-M at the factory|Y
01|131763|2|2|Non-returnable non-cancelable|Y
01|131765|1|1|CAT50-SF0750-5.00-IDKS|Y
01|131765|1|2|UNV_5153|Y
01|131777|3|1|Includes installation labor travel and training for|Y
01|131777|3|2|the customer.|Y
01|131793|1|1|Ref. RGA# TOR-55023 Repair of BT40-C1.1/4-90|Y
01|131793|1|2|BT40-C7/8-75 is unrepairable|Y
01|131793|7|1|Regreasing included|Y
01|131810|4|1|S15-ZMACX16-120V replaces S15-ZMACX16-120|Y
01|131811|1|1|CAT50-SF0750-5.00-IDKS|Y
01|131811|1|2|UNV_5153|Y
01|131814|1|1|***  No Face Plate  ***|Y
01|131814|6|1|Installation includes: drive unit short bar fiber|Y
01|131814|6|2|optic cables communication cables bulk head cable|Y
01|131814|6|3|set external cable set parameter changes service|Y
01|131814|6|4|time and travel|Y
01|131817|2|1|Marking with Pratt & Whitney part# TAM271851-59|Y
01|131824|3|1|Special 4+1 Rotary Union|Y
01|131824|3|2|** 3000 psi handling **|Y
01|131824|5|1|Installation includes: drive unit short bar fiber|Y
01|131824|5|2|optic cables communication cables bulk head cable|Y
01|131824|5|3|set external cable set parameter changes service|Y
01|131824|5|4|time and travel|Y
01|131864|1|1|Replacement for repair  RGA# CUR-54976|Y
01|131872|2|1|Only 1 pc in stock ETA on more is in MAY.|Y
01|131872|10|1|Only 1 pc available Lead time is long for more.|Y
01|131872|12|1|Two left then gone forever|Y
01|131872|14|1|6 left then gone forever.|Y
01|131876|1|1|TCE-A7185 Power cable CNC202MA-M s/n.27300TC|Y
01|131876|1|2|Special Order. Unit Price Each.|Y
01|131876|2|1|TCE-98394 Feedback cable CNC202MA-M s/n.27300TC|Y
01|131876|2|2|Special Order. Unit Price Each.|Y
01|131876|3|1|TCE-A3077 Power cable CNC202FA-M s/n.27301TC|Y
01|131876|3|2|Special Order. Unit Price Each.|Y
01|131876|4|1|TCE-94629 Feedback cable CNC202FA-M s/n. 27301TC|Y
01|131876|4|2|Special Order. Unit Price Each.|Y
01|131879|5|1|More then 2 pc will have a longer ETA|Y
01|131908|1|1|Includes 4 port rotary union on each platter|Y
01|131910|2|1|BT40-SMS22-60|Y
01|131925|4|1|Installation kit includes: dual axis drive unit short|Y
01|131925|4|2|bar fiber optic cables communication cables bulk|Y
01|131925|4|3|head cable set & external cables.|Y
01|131925|4|4|>>>> Heartland carries responsibility of communicating|Y
01|131925|4|5|specification of all above components prior to|Y
01|131925|4|6|shipment.|Y
01|131925|4|8|>>>> Support charge of $100.00 per hour for phone|Y
01|131925|4|9|assistance related to the installation of these|Y
01|131925|4|10|products.|Y
01|131925|8|1|Installation includes: drive unit short bar fiber|Y
01|131925|8|2|optic cables communication cables bulk head cable|Y
01|131925|8|3|set external cable set parameter changes service|Y
01|131925|8|4|time and travel|Y
01|131930|1|1|Pricing reflects used demo table at trade shows.|Y
01|131930|1|2|Please Note: Once a purchase order is placed it|Y
01|131930|1|3|cannot be cancelled or returned.|Y
01|131930|1|4|Pricing does not include installation.|Y
01|131930|3|1|Option #1|Y
01|131930|3|2|Installation by Lyndex Nikken with Tech from Chicago|Y
01|131930|4|1|Option #2|Y
01|131930|4|2|Installation Via CNC Engineering Tech - Day visit|Y
01|131930|5|1|Option #3|Y
01|131930|5|2|Installation Via CNC Engineering Tech - Overnight|Y
01|131930|7|1|Machine interface conection for full 4th axis|Y
01|131930|7|2|Includes service cables control accessorys etc.|Y
01|131930|8|1|Table retrofit - Includes Motors Covers Cables Etc.|Y
01|131954|1|1|z axis live tool for Mazak quickturn 250MY|Y
01|131954|2|1|x axis live tool for Mazak quickturn 250MY|Y
01|131957|1|1|BMT65-CO02mmx for haas ST|Y
01|131959|2|1|USED DISCOUNT|Y
01|131959|2|2|NON-RETURNABLE NON-CANCELABLE|Y
01|131962|1|1|TCE-95478/TCE-95479 wireharness for CNC401T|Y
01|131963|3|1|6000 RPM & 10 Nm Torque|Y
01|131963|4|1|5000 RPM & 25 Nm Torque|Y
01|131972|1|1|NBT30-HC12-72|Y
01|131972|1|2|Quoted as net pricing|Y
01|131972|1|3|Customer's request BBT30-HDC12S-90|Y
01|131972|2|1|NBT30-HC20-90|Y
01|131972|2|2|Quoted as net pricing|Y
01|131972|2|3|Customer's request BBT30-HDC20-60|Y
01|131972|3|1|NBT40-HC20-90|Y
01|131972|3|2|Quoted as net pricing|Y
01|131972|3|3|Customer's request BBT40-HDC20-90|Y
01|131972|5|1|NBT30-SK13C-90|Y
01|131972|5|2|Customer's request BBT30-HDC12S-90|Y
01|131972|6|1|Customer's request BBT30-HDC20-60|Y
01|131972|7|1|NBT40-SK20C-90|Y
01|131972|7|2|Customer's request BBT40-HDC20-90|Y
01|132006|1|1|Tool Cert #25000-2547-012720|Y
01|132009|4|1|C4006-0375-2.50-J holder modified with Jet Slots|Y
01|132009|4|2|Lead time approx 3 weeks|Y
01|132009|5|1|NC4006-0500-2.50-J holder modified with jet slots|Y
01|132009|5|2|Lead approx 3 weeks|Y
01|132011|2|1|Wrench for SK10 chuck.|Y
01|132011|4|1|Wrench for SK13 chuck.|Y
01|132014|1|1|NET PRICE PER HOT DEALS|Y
01|132029|1|1|Taper Plus NCAT50 2 EM Holder 10.5GL OD 2-15/16|Y
01|132029|1|2|2 set screws|Y
01|132053|1|1|Quoted as net pricing|Y
01|132053|1|2|RJ and EXT cables are included|Y
01|132058|4|1|This item is considered special once an order is|Y
01|132058|4|2|placed it cannot be cancelled or returned|Y
01|132058|5|1|This item is considered special once an order is|Y
01|132058|5|2|placed it cannot be cancelled or returned.|Y
01|132059|1|1|Tooling Certificate Number: 13485-1141-031318|Y
01|132070|1|1|Head is for coolant through spindle only|Y
01|132070|1|2|If non-coolant is required - Special or modicication|Y
01|132070|1|3|can be ordered - Price may vary|Y
01|132070|6|1|Total assembly weight: 12.6lbs|Y
01|132078|1|1|C5006-1000A-8.00-IDKS|Y
01|132078|1|2|UNV_5156|Y
01|132081|1|1|HSK63A to Capto C4 Conversion Adapter|Y
01|132089|1|1|Alternative in stock for 300-096|Y
01|132097|1|1|AHQ required to be completed prior to order acceptance|Y
01|132097|5|1|Total assembly weight: 12.6lbs|Y
01|132101|7|1|3/4 Miling chuck|Y
01|132128|6|1|hold 6mm|Y
01|132128|7|1|hold 10mm|Y
01|132131|1|1|C5006-1000A-8.00-IDKS|Y
01|132131|1|2|UNV_5156|Y
01|132155|1|1|Qouted as NET pricing|Y
01|132155|2|1|Quoted as NET pricing|Y
01|132165|1|1|NEED TO SWAP OUT REGO NUT FOR OUR BALL BEARING NUT|Y
01|132169|3|1|** A2-6 face plate adapter **|Y
01|132169|5|1|!!! Parameters needing defined !!!|Y
01|132170|2|1|Installation includes: drive unit short bar fiber|Y
01|132170|2|2|optic cables communication cables bulk head cable|Y
01|132170|2|3|set external cable set parameter changes service|Y
01|132170|2|4|time and travel|Y
01|132171|1|1|Tool 14|Y
01|132171|5|1|Tool 16|Y
01|132183|1|1|Replacement for HH960C115HE  M478|Y
01|132183|1|2|C1SB-115-M4774|Y
01|132193|3|1|Part# TCE-E6090 Int Power Cable|Y
01|132204|1|1|**Modified In-House - Final Part# NC5001-1000-1.75CP2|Y
01|132223|2|1|Discount reflects a purchase order of 2 heads.|Y
01|132223|3|1|Discount reflects a purchase order of 3 heads.|Y
01|132224|2|1|Discount reflects a purchase order of 2 heads.|Y
01|132224|3|1|Discount reflects a purchase order of 3 heads.|Y
01|132225|1|1|Includes: Table with motor hardwired cables cabinet|Y
01|132225|1|2|cables. Drive unit not included.|Y
01|132232|1|1|BMT75-CT40X-OFF-ICE|Y
01|132232|1|2|BMT75 CONNECTION; COOLANT THRU OFFSET X AXIS TOOL|Y
01|132232|2|1|BMT75-CT40Z-ICE-110|Y
01|132232|2|2|BMT75 CONNECTION Z AXIS TOOL W/ 110MM C/L|Y
01|132232|3|1|BMT75-ER25-AD-ICE|Y
01|132232|3|2|BMT75 CONNECTION; ER25 ADJUSTABLE ANGLE COOLANT THRU|Y
01|132239|4|1|C4006-0375-2.50-M holder modified with Jet Slots|Y
01|132239|4|2|Lead time approx 3 weeks|Y
01|132239|5|1|NC4006-0500-2.50-M holder modified with jet slots|Y
01|132239|5|2|Lead approx 3 weeks|Y
01|132279|1|1|HSK125A 3/4 Shrink Fit holder 6 gauge length|Y
01|132279|2|1|HSK125A 1 Shrink Fit holder 6 gauge length|Y
01|132316|1|1|This part # is the same/updated version of the|Y
01|132316|1|2|C5057-0016-12.00 which is no longer valid|Y
01|132316|2|1|We will have this length available sooner than the 12|Y
01|132316|2|2|as an option for you|Y
01|132318|1|1|Prices quoted above include training & installation|Y
01|132318|1|2|of 8 hours.  once invoice these items may not be|Y
01|132318|1|3|returned. Terms are FOB Mundelein by air ride truck.|Y
01|132326|1|1|Pricing specific to Table SSN: 17221|Y
01|132326|1|2|Rotary Table 180mm Right AA21 Control 400W|Y
01|132326|1|3|Pricing reflects used demo table at trade shows.|Y
01|132326|1|4|Please Note: Once a purchase order is placed it|Y
01|132326|1|5|cannot be cancelled or returned.|Y
01|132326|1|6|Pricing does not include installation.|Y
01|132345|2|1|Cable Set for CNC260OSP4-M|Y
01|132345|5|1|Start-up tooling package|Y
01|132346|4|1|MRAM-ER20-AD / ER20 collet output adjustable flex head|Y
01|132346|4|2|QTY Pricing 1pc. Ref. Mimatic Q#A20100682|Y
01|132346|6|1|MRAM-ER20-AD / ER20 collet output adjustable flex head|Y
01|132346|6|2|QTY Pricing 2pcs. Ref. Mimatic Q#A20100682|Y
01|132346|8|1|Custom Positioning Block for Mazak Super Velocity|Y
01|132346|8|2|Center 2000L/120-II|Y
01|132352|1|1|CAT50 Taper 90 Degree Angle Head with ER40 Collet|Y
01|132352|1|2|output internal coolant capabilities|Y
01|132352|1|3|150Nm max torque|Y
01|132352|1|4|Mimatic Part# 178114|Y
01|132352|1|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|132352|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|132353|1|1|CAT50 1-1/4 Pilot shell mill 20 GL|Y
01|132353|1|2|Quoted as NET pricingnon-returnablenoon-cancelable|Y
01|132353|1|3|ETA is after the approval drawing|Y
01|132356|4|1|Includes: Parameter adjustments service time and|Y
01|132356|4|2|travel.|Y
01|132369|1|1|*installed with retention knob PS-N46E at factory|Y
01|132369|2|1|*installed on NC5-63-FMA25.4-45 at factory|Y
01|132369|4|1|*installed with retention knob PS-N46E at factory|Y
01|132369|5|1|*installed on NC5-63-SK25C-135 at factory|Y
01|132369|7|1|*installed with retention knob PS-N46E at factory|Y
01|132369|8|1|*installed on NC5-63-C20-80G at factory|Y
01|132369|10|1|*installed with retention knob PS-N46E at factory|Y
01|132369|11|1|*installed on NC5-46-C20-80 at factory|Y
01|132370|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|132370|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|132370|2|2|600 PCS 9-10 WKS 300 PCS 11-12 WKS|Y
01|132373|1|1|This is non standard stock special item which will not|Y
01|132373|1|2|be cancelable nor returnable once ordered|Y
01|132373|1|3|On Quote file to confirm P&D|Y
01|132375|3|1|FOREX JPY105 GP40%|N
01|132389|3|1|Intallation Includes: optic cables communication|Y
01|132389|3|2|cables parameter changes service time and travel|Y
01|132391|2|1|On CBO for delv|Y
01|132411|1|1|Full Manual tilt and rotation|Y
01|132419|1|1|Repair of 5AX-201 s/n: 4150|Y
01|132419|1|2|RGA# TAR-55135|Y
01|132427|4|1|Includes: Parameter adjustments service time and|Y
01|132427|4|2|travel.|Y
01|132427|5|1|Requires subplate for mounting|Y
01|132439|1|1|BT40-SK13-75|Y
01|132459|6|1|Hydraulic hose 5.0Meters|Y
01|132459|7|1|Include amp cables hose/hydra|Y
01|132459|7|2|electrical cabinet wiring parameter changes|Y
01|132459|7|3|service time/travel|Y
01|132459|7|4|Subject to change by Kuraki HBM model/specs|Y
01|132459|7|5|Kuraki arranges 4th Axis option parameter & interface|Y
01|132460|3|1|Installation includes: drive unit short bar fiber|Y
01|132460|3|2|optic cables communication cables bulk head cable|Y
01|132460|3|3|set external cable set parameter changes service|Y
01|132460|6|1|Any addition Fanuc software and ladder configuration|Y
01|132460|6|2|is the resposability of CMT|Y
01|132462|1|1|Tool Cert #13170TA-2539-011320|Y
01|132462|2|1|Tool Cert #13170TAQ-2579-21720|Y
01|132483|19|1|ETA: 2-3 Weeks aro|Y
01|132485|1|1|NO WORKHOLDING INCLUDED.|Y
01|132485|6|1|Hydraulic hose 5.0Meters|Y
01|132485|7|1|Include servo motor amp cables hose/hydra|Y
01|132485|7|2|electrical cabinet wiring parameter changes|Y
01|132485|7|3|service time/travel|Y
01|132485|7|4|Subject to review of data sheet and machine ladder|Y
01|132485|7|5|Toyoda arranges 4th Axis option parameter|Y
01|132504|1|1|Includes: 800MM rotary table with Nikken AA21 control|Y
01|132504|1|2|external cable set M-code cable pendant with 15ft|Y
01|132504|1|3|cable.|Y
01|132504|3|1|800MM table without servo motor.|Y
01|132504|3|2|Requires 500PSI for the brake system.|Y
01|132510|1|1|H40E-SF0125-2.36 HSK40E 1/8 Shrink Fit Holder|Y
01|132510|1|2|Pre-Balanced|Y
01|132510|3|1|H40E-SF0250-2.36 HSK40E 1/4 Shrink Fit Holder|Y
01|132510|3|2|Pre-Balanced|Y
01|132510|5|1|H40E-SF0125-2.37 Mini Shrink Fit|Y
01|132513|12|1|***We do not offer dual***|Y
01|132521|1|1|4 pieces in stock; 5 pieces 2-3wks mfg plus 1 wk ship|Y
01|132521|1|2|6 pieces or balance 8-9 wks mfg plus 1 wk ship|Y
01|132521|2|1|6 pieces stock; 4 pieces 2-3wks mfg plus 1wk ship|Y
01|132521|2|2|4 pieces or balance 8-9wks mfg plus 1 wk ship|Y
01|132523|6|1|Please Note Old P/N was SKN-6WBJ|Y
01|132524|10|1|ER32 TAP COLLET FOR 1/4 TAP|Y
01|132524|10|3|Y|Y
01|132524|11|1|ER32 TAP COLLET FOR 1/2 TAP|Y
01|132531|5|1|Lyndex-Nikken to make position block based on spindle|Y
01|132531|5|2|drawing confirmation from customer|Y
01|132537|1|1|Reference RGA# TAR-55120|Y
01|132537|1|2|CNCZ202LYA-BR s/n: 6021|Y
01|132539|4|1|BT30-TB40-300  Pull Stud PS-17 included.|Y
01|132539|4|2|#30 BT Flange TEST BAR Dia.40mm L:300mm|Y
01|132539|4|3|Special Order. Unit Price Each.|Y
01|132551|1|1|Please Note: Price reflects Start II Unit Accessories|Y
01|132551|1|2|and 10 free holders from list of tool holders.|Y
01|132551|1|3|Shrink Fit Unit must ship by truck.|Y
01|132551|4|1|Please Note: Preice reflects purchase of Start II|Y
01|132551|4|2|machine only.|Y
01|132563|1|1|Reference RGA# LVR-55157|Y
01|132563|1|2|Repair of MNZ20-ER25Z-MS s/n: A0043|Y
01|132563|1|3|(Alps# T32276A)|Y
01|132563|2|1|Bearings O-rings Collet Nuts Gears and spindle to be|Y
01|132563|2|2|replaced. ***We will try to clean up the original|Y
01|132563|2|3|spindle and re-use; however we will not be able to|Y
01|132563|2|4|tell if it will be re-usable until assembled and test|Y
01|132563|2|5|run. If we are able to re-use the price will be|Y
01|132563|2|6|$1828.40|Y
01|132567|4|1|Substitute for HSK100A-ER32-4.00 if needed before|Y
01|132567|4|2|03/20/2020.|Y
01|132577|19|1|Offered as an in stock option to line 18|Y
01|132582|2|1|Though No stock shows all pieces are in stock to build|N
01|132582|2|2|the set if we get the order|N
01|132610|7|1|** Closeout Promotion! All sales are FINAL!**|Y
01|132613|1|1|S19-ZMACX20-150V Straight Shank Deep Hole ZMACX|Y
01|132613|1|2|Boring Bar Holder: Boring Range 19.8~25.2|Y
01|132620|1|1|Repair of CNCZ180LFA|Y
01|132625|3|1|Stocked alternative - using VMK12 collets|Y
01|132625|3|2|**This holder is DIN- coolant thru flange. It can be|Y
01|132625|3|3|used with no coolant or we will plug DIN holes at no|Y
01|132625|3|4|additional charge|Y
01|132625|4|1|example of price of VMK12 collets|Y
01|132643|1|1|Reference RGA# LVR-55134|Y
01|132643|1|2|For NKA01-38000 s/n: AL067|Y
01|132643|1|3|Customer has declined repairs for all tools below.|Y
01|132643|3|1|For NKA01-38000 s/n: AL072|Y
01|132643|5|1|For NKA01-38000 s/n: AL083|Y
01|132647|7|1|**CLOSE OUT PROMOTION ALL SALES FINAL***|Y
01|132652|1|1|HFO TO PROVIDE LYNDEX NIKKEN MOTOR AND CABLES|Y
01|132652|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|132654|1|1|P/N for Haas would be 5AX-2MT-170-200YA-M and includes|Y
01|132654|1|2|Haas Motors and Cables|Y
01|132654|2|1|Special Rotary Union for 5AX-2MT-170-200|Y
01|132654|2|2|4 port that can accept air or Hyd (3.5MPA Max)|Y
01|132656|2|1|Quoted at Net Price. Delivery is based upon a purchase|Y
01|132656|2|2|order after our technical department speaks to end user|Y
01|132656|2|3|for machine information.|Y
01|132688|1|1|HOWA# HH0JD50X15 Jig Cylinder|Y
01|132696|1|1|UNV_5238|Y
01|132696|1|2|Part #'s have been updated our shell mill holders|Y
01|132696|1|3|will now come standard with coolant ports. They may|Y
01|132696|1|4|need to change their UNV number or at least update the|Y
01|132696|1|5|revision|Y
01|132697|1|1|Installation not included|Y
01|132703|3|1|If this item is what they want let me know I'll have to|Y
01|132703|3|2|Check the lead time with the factory.|Y
01|132708|1|1|CNC260LFA-M (including Motor) s/n.8827|Y
01|132708|1|2|Special Order. Unit Price Each.|Y
01|132708|2|1|CNC260LFA s/n.8827|Y
01|132708|2|2|Special Order. Unit Price Each.|Y
01|132708|3|1|Cable set(TCE-A4193 Power + TCE-94828 Feedback)|Y
01|132708|3|2|Special Order. Unit Price Each.|Y
01|132712|2|1|Lyndex-Nikken to make block.|Y
01|132712|2|2|Delivery is from receipt of spindle drawing info|Y
01|132725|1|1|C6-SK6-60 Polygon C6 SK6 Slim Chuck 60mm Gage|Y
01|132725|2|1|C6-SK6-90 Polygon C6 SK6 Slim Chuck 90mm Gage|Y
01|132732|6|1|7/8 End Mill Holder is discontinued.|Y
01|132732|6|2|C5016-0875-6.00DIN is in stock. Coolant thru the flange|Y
01|132732|6|3|C5016-0875B   is in stock. This is a Balanceable holder|Y
01|132736|1|1|SST16-ECH7-32 Straight Shank Ext Floating Tap Holder|Y
01|132736|1|2|ER11.|Y
01|132739|1|1|SST16-ECH7-32 Straight Shank Ext Floating Tap Holder|Y
01|132748|5|1|One time discount per BB. Items are NOT RETURNABLE|Y
01|132759|3|1|JET SLOT MODIFICATION NOT AVAILABLE ON THIS TOOL|Y
01|132759|4|1|JET SLOT MODIFICATION NOT AVAILABLE ON THIS TOOL|Y
01|132759|5|1|JET SLOT MODIFICATION NOT AVAILABLE ON THIS TOOL|Y
01|132759|6|1|JET SLOT MODIFICATION NOT AVAILABLE ON THIS TOOL|Y
01|132759|7|1|JET SLOT MODIFICATION NOT AVAILABLE ON THIS TOOL|Y
01|132761|2|1|Lyndex-Nikken to make position block upon receipt of|Y
01|132761|2|2|spindle drawing confirmation|Y
01|132765|1|1|Howa Piston Rod for JKB40X36-S1-HK|Y
01|132771|8|1|This item is considered special once an order is|Y
01|132771|8|2|placed it cannot be cancelled or returned.|Y
01|132781|1|1|Repair of Rotary Table 5AX-201 SN 4316|Y
01|132781|1|2|Below is repair items and also other items to|Y
01|132781|1|3|be complete working rotary table for Brother Machine|Y
01|132799|3|1|GL 114mm(4.49inch)|Y
01|132814|1|1|***Not for Erickson Quick Change|Y
01|132817|1|1|H80F-SF1000-6.30B Per print from Mecachrome Canada|Y
01|132817|1|2|With Makino Pins|Y
01|132821|1|1|Includes Haas motor and cable set.|Y
01|132824|1|1|Please note; The BT40-UMT200W is non standard stock.|Y
01|132824|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|132824|1|3|or returned.|Y
01|132825|1|1|Please note; The BT40-UMT200W is non standard stock.|Y
01|132825|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|132825|1|3|or returned.|Y
01|132827|1|1|Please note; The BT40-UMT200W is non standard stock.|Y
01|132827|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|132827|1|3|or returned.|Y
01|132828|1|1|Replacement stylus for BT40-UMT200H >>Hitachi|Y
01|132835|1|1|ETA 2 weeks|Y
01|132838|1|1|Convert table from Fanuc to Mitsubishi.|Y
01|132838|1|2|Includes motor motor gear wire harness solenoid|Y
01|132838|1|3|pressure switch and labor.|Y
01|132838|2|1|Mitsubishi campatible scale +/-3 seconds.|Y
01|132838|2|2|Includes mouting onto exisitng scale kit.|Y
01|132838|3|1|Includes: Drive unitshort bar fiber optic cable|Y
01|132838|3|2|communications cable bulkhead cables external cables|Y
01|132838|3|3|service time and travel.|Y
01|132857|1|1|TAR-55245|Y
01|132857|1|2|Customer brought in 8800AX Controller that was|Y
01|132857|1|3|smoking - found resistor and fan to be bad.|Y
01|132857|1|4|Replacing the above parts|Y
01|132857|3|1|Resistor - $250.00 - KE IWAKI RH220 40K OHM|Y
01|132857|3|2|Replacement Fan - $150.00 - 109S-008UL|Y
01|132857|4|1|Lyndex-Nikken does not guarentee the performance|Y
01|132857|4|2|and/or reliability of the controller due to age|Y
01|132857|4|3|Customer understands that replacing these components|Y
01|132857|4|4|may or may not solve the underlying issue and that no|Y
01|132857|4|5|guarentees are made.|Y
01|132881|1|1|Qouted as NET pricingnon-returnablenon-cancelable|Y
01|132881|2|1|Qouted as NET pricingnon-returnablenon-cancelable|Y
01|132881|3|1|Qouted as NET pricingnon-returnablenon-cancelable|Y
01|132881|4|1|Qouted as NET pricingnon-returnablenon-cancelable|Y
01|132889|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|132889|1|2|ETA after approval drawing is signed|Y
01|132889|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|132889|2|2|ETA after approval drawing is signed|Y
01|132889|3|1|SA3080-ER16-AD-ICE|Y
01|132889|3|2|Mimatic# 194954|Y
01|132889|3|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|132889|3|4|ETA after drawing approval signed|Y
01|132889|4|1|SA3080-ER25-77FA-ICE|Y
01|132889|4|2|Sauter DIN5480 W16X0.8X30X18/9B VDI30 ER25 FIX 77deg|Y
01|132889|4|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|132889|4|4|ETA begins after approval drawing is signed|Y
01|132889|4|5|(1) PC Pricing|Y
01|132889|5|1|SA3080-ER25-77FA-ICE|Y
01|132889|5|2|Sauter DIN5480 W16X0.8X30X18/9B VDI30 ER25 FIX 77deg|Y
01|132889|5|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|132889|5|4|ETA begins after approval drawing is signed|Y
01|132889|5|5|(2) PC Pricing|Y
01|132893|3|1|quantity break pricing|Y
01|132895|1|1|2 WEEKS ETA|Y
01|132905|1|1|ETA 3-4 Weeks|Y
01|132905|2|1|ETA 9-10 weeks|Y
01|132905|3|1|Charge will be determined based on the specifications|Y
01|132905|3|2|provided|Y
01|132916|1|1|CAT40-TB1.3/4-200 CAT40 Testbar with 200mm Gage Length|Y
01|132916|1|2|With Flange/Wooden Case|Y
01|132916|1|3|Quoted at Net Price|Y
01|132916|3|1|CAT40-TB1.3/4-200NF CAT40 Testbar with 200mm Gage Ltg|Y
01|132916|3|2|No Flange Type/In Wooden Case|Y
01|132916|3|3|Quoted at Net Price|Y
01|132916|5|1|CAT50-TB1.3/4-200 CAT50 Testbar with 200mm Gage Length|Y
01|132916|5|2|With Flange/Wooden Case|Y
01|132916|5|3|Quoted at Net Price|Y
01|132916|7|1|CAT50-TB1.3/4-200 CAT50 Testbar with 200mm Gage Length|Y
01|132916|7|2|No Flange Type/In Wooden Case|Y
01|132916|7|3|Quoted at Net Price|Y
01|132920|1|1|TOOLING CERTIFICATE|Y
01|132925|3|1|Note:Item is non-standard stock/special. Once a PO has|Y
01|132925|3|2|been received it can not be cancelled or returned.|Y
01|132930|1|1|comes w/ 2x SF-POT-#40 at no additional charge|Y
01|132930|4|1|comes w/ 3x SF-POT-#40 at no additional charge|Y
01|132934|1|1|** Includes external cables|Y
01|132939|3|1|JET SLOT MODIFICATION NOT AVAILABLE ON THIS ITEM|Y
01|132946|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|132949|1|1|Tooling Certificate Number:13712-2521-121919|Y
01|132954|1|1|Alps part# SSH22-ECH10MS-70|Y
01|132954|1|2|L3 dimension 70mm|Y
01|132954|2|1|Alps part# SSH22-ECH10MS-80|Y
01|132954|2|2|L3 dimension 70mm confirmed by Alps|Y
01|132964|1|1|*not avail in 8|Y
01|132969|1|1|Includes Cooling Unit Induction Rings Cooling Bracket|Y
01|132969|1|2|Storage Racks (2)Chuck Holders Installation & Trainin|Y
01|132986|2|1|Lyndex-Nikken to make position block|Y
01|132986|2|2|Delivery is from receipt of spindle drawing conf.|Y
01|132986|2|3|*net price|Y
01|132988|2|1|Installation includes: drive unit short bar fiber|Y
01|132988|2|2|optic cables communication cables bulk head cable|Y
01|132988|2|3|set external cable set parameter changes service|Y
01|132988|2|4|time and travel|Y
01|132994|3|1|Installation includes: drive unit short bar fiber|Y
01|132994|3|2|optic cables communication cables bulk head cable|Y
01|132994|3|3|set external cable set parameter changes service|Y
01|132994|3|4|time and travel|Y
01|133003|4|1|Lyndex-Nikken to make position block based on final|Y
01|133003|4|2|spindle drawing|Y
01|133003|4|3|*net price|Y
01|133005|2|1|Installation kit includes:|Y
01|133005|2|2|Drive external cables internal cables|Y
01|133005|2|3|fiber optic cables short bar and Fanuc|Y
01|133005|2|4|battery.|Y
01|133006|11|1|Quoted as NET pricing|Y
01|133022|2|1|Installation includes: Drive unit short bar fiber|Y
01|133022|2|2|optic cable communitcations cable bulkhead cables|Y
01|133022|2|3|external cables service time and travel.|Y
01|133031|2|1|Lyndex-Nikken to make position block.|Y
01|133031|2|2|Delivery is from receipt of spindle drawing conf.|Y
01|133031|2|3|*net price|Y
01|133037|1|1|Quoted as net pricing|Y
01|133046|37|1|2 Weeks|Y
01|133046|38|1|2 Weeks|Y
01|133052|1|1|** 105mm through bore **|Y
01|133052|2|1|** 105mm through bore **|Y
01|133052|2|2|`|N
01|133056|2|1|Special price break for 40 ea if all 40 pieces are|Y
01|133056|2|2|ordered on the same PO|Y
01|133093|2|1|Lyndex-Nikken to make block.|Y
01|133093|2|2|Delivery is from receipt of spindle drawing info|Y
01|133094|1|1|HSK63A-SK20-105|Y
01|133095|9|1|SEALED SUBSTITUTE FOR ET40-542|Y
01|133100|1|1|Includes: Table with face plate and cable set.|Y
01|133100|2|1|Includes: Table with face plate and cable set.|Y
01|133106|2|1|Lyndex-Nikken to make position block.|Y
01|133106|2|2|Delivery is from receipt of spindle drawing conf.|Y
01|133106|2|3|*net price|Y
01|133114|2|1|Installation includes: Drive unit short bar fiber|Y
01|133114|2|2|optic cable bulkhead cables external cables|Y
01|133114|2|3|parameter changes service time and travel.|Y
01|133118|1|1|cat40 ER8 Collet Chuck with a 5 GL C4007-0008-5.00?|Y
01|133118|1|2|*Please specify taper angle either 3or 5|Y
01|133121|1|1|**NOTE** 3 pcs in stock 3 pcs ETA 3/30 Bal 2-1/2 mos|Y
01|133126|28|1|2 Tech Nikken Japan|Y
01|133126|28|2|1 Tech Lyndex Mexico|Y
01|133139|1|1|(1) PC ETA 1 WK Balance 22 WKS|Y
01|133139|2|1|(1) PC ETA 1 WK Balance 22 WKS|Y
01|133164|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|133169|1|1|NA50-OK|Y
01|133169|1|2|Delivery is 1 week if ordered by today 3/11/2020|Y
01|133175|1|1|Reference RGA# LVR-55170|Y
01|133175|1|2|Repair of BMT65-SK20Z-ICE-CCW s/n: 77414 09|Y
01|133175|1|3|(Mimatic# 187161)|Y
01|133175|2|1|Bearings seals o-rings damaged ER32 spindle and C/G|Y
01|133175|2|2|input spindle to be replaced.|Y
01|133198|11|1|Morse Taper #4 Cylinder|Y
01|133224|1|1|include 2 tables / Cables / Interface components|Y
01|133224|2|1|Include 2 tables / Cables / Interface components|Y
01|133229|1|1|*1pc pricing|Y
01|133229|2|1|*2-4pc pricing|Y
01|133229|3|1|*5pc+ pricing|Y
01|133229|3|2|HSK32E Spring Column Drill Head|Y
01|133229|3|3|HSK32E w/ 65mm pitch with accessory mounting holes on|Y
01|133229|3|4|Housing Face|Y
01|133229|3|5|External coolant|Y
01|133229|3|6|Dual output dia 3mm Weldon Shank with .688 pitch|Y
01|133229|3|7|10000 rpm Max.|Y
01|133236|2|1|Please be aware shrink item may ship via truck|Y
01|133239|1|1|Price does not include installation|Y
01|133239|1|2|Spare M code Needed for installation|Y
01|133239|3|1|Price does not include installation|Y
01|133239|3|2|Two M codes needed for installation|Y
01|133250|37|1|2 Weeks|Y
01|133250|38|1|2 Weeks|Y
01|133253|1|1|NBT30 2 Lock Taper Plus 6mm Chuck holder|Y
01|133253|1|2|FF approved putting on quote file|Y
01|133253|2|1|BT30 Standard 6mm Chuck holder|Y
01|133253|2|2|Cust will decide between dual contact and standard|Y
01|133253|2|3|Accepting an order will be based on drawing approval|Y
01|133272|1|1|One time discount. Item is NOT RETURNABLE|Y
01|133284|5|1|NT50 taper center socket with manual draw bolt.|Y
01|133284|9|1|Installation includes: Drive unit short bar fiber|Y
01|133284|9|2|optic cable communications cable bulkhead cables|Y
01|133284|9|3|external cables parameter changes service time and|Y
01|133284|9|4|travel.|Y
01|133291|2|1|Installation includes drives install travel labor|Y
01|133291|2|2|and parameter changes.|Y
01|133291|4|1|1 full set of Rotary Table Cables|Y
01|133304|4|1|**Jet Style**|Y
01|133304|5|1|*customer to modify blank to coolant 3.5 disc*|Y
01|133306|1|1|Installation not included|Y
01|133306|1|2|two spare M codes required for installation|Y
01|133306|3|1|Installation not included in quote|Y
01|133306|3|2|spare M code required for installation|Y
01|133314|9|1|Uses the FK-8 and FK-9 wrench|Y
01|133317|2|1|2Lock Dual contact taper type|Y
01|133317|7|1|Parts#: SK20-18P|Y
01|133317|7|2|SK20 Slim Chuck Collet 18.0-17.5mm Precision|Y
01|133324|1|1|Table shown at list value|Y
01|133324|1|2|Purchase must be made though Distributor|Y
01|133324|3|1|M codes required for each axis|Y
01|133324|3|2|Installation not included|Y
01|133334|1|1|HSK63A-SCA32-90|Y
01|133334|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|133334|2|1|BT40-SCA32-90|Y
01|133334|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|133380|1|1|KM32-15.850|Y
01|133380|1|2|KM32 .624 ID collet|Y
01|133380|3|1|KM32-19.025|Y
01|133380|3|2|KM32 .749 ID collet|Y
01|133393|1|1|Reference RGA# TAR-55150|Y
01|133393|1|2|5AX-2MT-105-120FA s/n: 8100|Y
01|133394|1|1|Reference RGA# LVR-55219|Y
01|133394|1|2|Repair of BMT45-SK20Z-ICE-CCW s/n: 92023 10|Y
01|133394|1|3|(Mimatic# 188046)|Y
01|133394|2|1|Bearings seals and o-rings to be replaced|Y
01|133397|2|1|Swing Box|Y
01|133398|2|1|Swing Box|Y
01|133402|1|1|Please Note: This item will come from Italy. Delivery|Y
01|133402|1|2|could change pending government instructions.|Y
01|133416|12|1|Collets option for SK Sleeve and Zero Zero Holder|Y
01|133416|16|1|On Size Collet. No Collapse Range.|Y
01|133418|1|1|Reference RGA# TAR-55244|Y
01|133418|1|2|CNC300FA s/n: 1261|Y
01|133418|4|1|Wire Harness|Y
01|133418|23|1|Mitsubishi Motor Replacement|Y
01|133421|15|1|SKJ6-2.25 Slotted Disc|Y
01|133421|18|1|SKJ6-3.5C Coolant Disc|Y
01|133421|21|1|SKJ6-3.5C Coolant Disc|Y
01|133429|1|1|We will need to have the right angle form filled out|Y
01|133429|1|2|before we will ship the order.|Y
01|133429|2|1|As a result of travel restrictions cargo space may be|Y
01|133429|2|2|limited causing delay in shipping|Y
01|133447|2|1|Installation includes: Optic cables parameter changes|Y
01|133447|2|2|service time and travel.|Y
01|133447|3|1|1 full set of Cables|Y
01|133449|1|1|Eval of Repair for 5AX-201OSP4-ME40 SN: 6355|Y
01|133449|1|2|Customer had crash at 90 degrees|Y
01|133449|1|3|Locating Pins Bent Damage to Worm Wheel/Screw|Y
01|133463|1|1|no MOQ|Y
01|133463|2|1|no MOQ|Y
01|133469|2|1|HSK63A-SK13C-120P|Y
01|133469|2|2|Please note: This holder is non standard stock. Once|Y
01|133469|2|3|a purchase order is placed it cannot be cancelled or|Y
01|133469|2|4|returned.|Y
01|133489|2|1|Service includes: Connecting/wiring & testing system.|Y
01|133489|2|3|** M-code options must be enabled prior to arrival **|Y
01|133492|1|1|** Prepared with Sigma 1 motor **|Y
01|133498|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|133498|7|1|HYDRAULIC MANIFOLD PRESSURE REGULATOR FOR AIR/HYD|Y
01|133500|1|1|PRICE FOR 1-5 TABLES|Y
01|133500|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|133500|7|1|HYDRAULIC MANIFOLD PRESSURE REGULATOR FOR AIR/HYD|Y
01|133501|1|1|PRICE FOR 6-10 TABLES|Y
01|133501|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|133501|7|1|HYDRAULIC MANIFOLD PRESSURE REGULATOR FOR AIR/HYD|Y
01|133526|1|1|EXTERNAL POWER/FEEDBACK CABLE FOR ROTARY|Y
01|133526|1|2|FROM ROTARY TO BULKHEAD|Y
01|133526|3|1|INTERFACE CABLES FROM BULKHEAD TO CABINET|Y
01|133529|2|1|Nikken Part Number M2HZL-A adjustment handle|Y
01|133529|3|1|part number S15-ZMACX16-120V not in nerp|Y
01|133529|3|2|Straight Shank DEEP HOLE ZMACX BORING BAR|Y
01|133531|1|1|Reference RGA# TAR-55150|Y
01|133531|1|2|5AX-2MT-105-120 s/n: 8112H|Y
01|133538|1|1|Minimum QTY. 3pcs. BT30 8mm Shrink Fit Balanceable|Y
01|133538|2|1|Minimum QTY. 3pcs. BT30 10mm Shrink Fit Balanceable|Y
01|133538|3|1|Qty. Price Break BT30 8mm Shrink Fit Balanceable|Y
01|133538|4|1|Qty. Price Break BT30 10mm Shrink Fit Balanceable|Y
01|133538|5|1|Qty. Price Break BT30  8mm Shrink Fit Balanceable|Y
01|133538|6|1|Qty. Price Break BT30 10mm Shrink Fit Balanceable|Y
01|133545|4|1|Optional but recomended|Y
01|133553|10|1|offered as a quicker delivery option|Y
01|133557|1|1|Fully Manual Indexer|Y
01|133557|1|2|No Automated Controls - Hand Wheel Indexing|Y
01|133569|1|1|2Lock TaperPlus NCAT50 Hydraulic Chuck 20mm|Y
01|133569|7|1|2Lock TaperPlus NCAT50 Hydraulic Chuck 32mm|Y
01|133570|2|1|In stock option to the above B/O item|Y
01|133574|1|1|BT40-SK13-90 BT40 SK13 Slim Chuck|Y
01|133574|2|1|BT40-SK13-120  BT40 SK13 Slim Chuck|Y
01|133589|33|1|Jet slots no available only coolant port|Y
01|133596|1|1|ETA 2 Weeks|Y
01|133600|3|1|5pc MOQ|Y
01|133600|3|2|QCFC65-42.93-SP|N
01|133600|5|1|5pc MOQ|Y
01|133600|5|2|QCC-DL65-BACKSTOP-SP|N
01|133613|2|1|To be converted from Std stock to Hi speed|Y
01|133626|4|1|L&N part# BMT55-EM25Z-RG2-125-CCW|Y
01|133626|4|2|BMT55 LIVE; EM 25mm OUTPUT; 90 DEG TOOL - 125mm CENTER|Y
01|133626|4|3|HEIGHT|Y
01|133626|4|4|EXTERNAL COOLANT;|Y
01|133626|4|5|2:1 GEAR; 80Nm MAX;|Y
01|133626|4|6|MAX INPUT 6500RPM; MAXOUTPUT 3250RPM|Y
01|133626|4|7|DIRECTION ROTATION REVERSAL|Y
01|133626|4|8|Ref. Mimatic drawing# 00056975|Y
01|133627|1|1|C6-SK6-60 Polygon C6 SK6 Slim Chuck 60mm Gage|Y
01|133627|2|1|C6-SK6-90 Polygon C6 SK6 Slim Chuck 90mm Gage|Y
01|133627|19|1|C6-180-TH25R-115  Polygon Taper Square Tool Holder|Y
01|133638|5|1|SK10-3.25A|Y
01|133638|5|2|Nikken SK10 3.25mm On-Size Collet|Y
01|133638|5|3|*min. 2pc required|Y
01|133638|5|4|*Non-returnable/Non-cancelable|Y
01|133638|5|5|*Net pricing|Y
01|133647|33|1|Jet slots no available only coolant port|Y
01|133657|1|1|HSK ER Holder|Y
01|133657|2|1|Taper Plus ER Holder|Y
01|133657|3|1|HSK side lock endmill holder|Y
01|133657|4|1|Taper Plus sidelock endmill holder|Y
01|133657|5|1|HSK Shellmill adapter|Y
01|133657|6|1|Taper Plus Shellmill adapter|Y
01|133664|1|1|P/N: HSK40A-SK10-60P|Y
01|133664|1|2|HSK40A Taper SK10 Slim Chuck Hi-Speed|Y
01|133668|1|1|Reference RGA# LVR-55254|Y
01|133668|1|2|Repair of NK103-12000 s/n: AL0026|Y
01|133668|1|3|(Alps# same as our part#)|Y
01|133668|2|1|Bearings o-rings collet nut small parts and spindle|Y
01|133668|2|2|to be replaced|Y
01|133681|1|1|Reference RGA# LVR-55189|Y
01|133681|1|2|Repair of MZQT5-MI63Z-C s/n: 42627 01|Y
01|133681|1|3|(Mimatic# 124878)|Y
01|133681|2|1|Bearings seals o-rings MI63 Spindle assembly and|Y
01|133681|2|2|damaged gears to be replaced|Y
01|133703|6|1|Complete installation by L-N|Y
01|133729|2|1|2015 Model only shown in Trade Shows very tiny|Y
01|133729|2|2|scratches on faceplate. Full 1 year Warranty.|Y
01|133729|3|1|Cable set for both axis. Cables included in Lyndex|Y
01|133729|3|2|Nikken installation.|Y
01|133791|3|1|*** Cable length to be specified at placement of order|Y
01|133803|2|1|Motor Model would be A06B-0235-B000|Y
01|133803|4|1|Motor Model would be A06B-0235-B000|Y
01|133803|6|1|Includes new Cable Set service time and travel.|Y
01|133803|6|2|Use Ellison owned A06B-6160-H004 Servo Amp Beta iSV 80B|Y
01|133803|6|3|already installed in machine.|Y
01|133868|1|1|Installed with PS-123E at the factory|Y
01|133868|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|133868|2|1|Installed on S-NC5-46-FMA31.75CS-45-M at the factory|Y
01|133881|2|1|Installation includes: drive unit short bar fiber|Y
01|133881|2|2|optic cables communication cables bulk head cable|Y
01|133881|2|3|set external cable set parameter changes service|Y
01|133881|2|4|time and travel|Y
01|133881|2|5|***************************************************|Y
01|133881|2|6|Please note availability of Service Techs are|Y
01|133881|2|7|limited due to COVID-19 travel limitations. L-N|Y
01|133881|2|8|will make REASONABLE accomidations during this time.|Y
01|133904|1|1|C5006-1500A-3.00IDKS - UNV_5091|N
01|133923|7|1|Please Note: Since they requested 13 holders I can|Y
01|133923|7|2|offer 13 knobs at $5.00 net each. If quantity of|Y
01|133923|7|3|holders change I will need to re-quote.|Y
01|133928|3|1|Item is non standard stocknot cancelable or returnable|Y
01|133928|4|1|Item is non standard stocknot cancelable or returnable|Y
01|133928|7|1|Item is non standard stocknot cancelable or returnable|Y
01|133928|8|1|Item is non standard stocknot cancelable or returnable|Y
01|133929|1|1|HSK63A Hydraulic Chuck 20mm|Y
01|133929|1|2|HSK63A-HC20-(GL TBA based on whether there is a std GL|Y
01|133929|1|3|on Quote File for P&D|Y
01|133929|2|1|FP is verfiying this chip is correct|Y
01|133936|1|1|C5006-1500A-3.00IDKS  - UNV_5091|N
01|133937|5|1|One time discount per BB. Items are NOT RETURNABLE|Y
01|133939|1|1|ref. Mori# N29110|Y
01|133956|2|1|BT40-FMA31.75C-45|Y
01|133956|2|2|BT40 1.1/4 Face / Shell Mill Holder Coolant through|Y
01|133956|2|3|Special Order Item.|Y
01|133964|2|1|In stock substitute to above back order item|Y
01|133970|3|1|Installation includes: Dual axis drive fiber optic|Y
01|133970|3|2|cables communications cables bulkhead cables|Y
01|133970|3|3|external cables service time and travel.|Y
01|133970|3|4|Ladder and additional axis software option not included|Y
01|133971|6|1|NO ALTERNATIVE FOR THIS TOOL IN STOCK|Y
01|133971|10|1|COOLANT THRU WILL BE USED ON THESE HOLDLERS|Y
01|133971|11|1|NO COOLANT THRU WILL BE USED ON THIS HOLDER|Y
01|133971|16|1|NO ALTERNATIVE FOR THIS TOOL (X AXIS OFFSET SUB SP)|Y
01|133971|22|1|ALTERNATIVE TOOLS IN STOCK BELOW|Y
01|133972|3|1|Replacement 3 Extension Live Center|Y
01|133972|3|2|Part # PBA105R200330B01/0|Y
01|133972|3|3|Per attached drawing|Y
01|133978|1|1|Non-returnable non-cancelable|Y
01|133979|3|1|Special sub-plate|Y
01|133982|3|1|ref. old temporary part#NKA01-99077|Y
01|133982|4|1|ref. old temporary part#NKA01-99078|Y
01|133982|5|1|ref. old temporary part#NKA01-99082|Y
01|133985|1|1|TOR-55291|Y
01|133985|1|2|B4505-0875 Tap Holder sent in disassembled|Y
01|133985|1|3|Holder was cleaned and ball bearings replaced|Y
01|133988|1|1|Discount applies to quantities of 2-10 pcs.|Y
01|133993|3|1|AIR HYD. BOOSTER FOR BRAKE. IF NEEDED FOR APPLICATION|Y
01|133993|5|1|Installation includes: Dual axis drive fiber optic|Y
01|133993|5|2|cables communications cables bulkhead cables|Y
01|133993|5|3|external cables service time and travel.|Y
01|133993|5|4|Ladder and additional axis software option not included|Y
01|134002|1|1|HFO TO PROVIDE LYNDEX NIKKEN MOTOR AND CABLES|Y
01|134002|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|134009|1|1|HFO TAMPA TO SUPPLY MOTOR AND CABLES|Y
01|134009|1|2|TABLE AND TAILSTOCK IN STOCK|Y
01|134019|1|1|ref. Mori T10119|Y
01|134024|1|1|External Coolant|Y
01|134024|2|1|Replaces WRENCH-MIM-107566|Y
01|134035|1|1|OD Turning Holder|Y
01|134035|2|1|Trepanning / Face Grooving Tool|Y
01|134035|3|1|1.5 Boring Bar Holder. A Boring Bar Sleeve|Y
01|134035|3|2|will be required for the 1.0 inch OD Tool (qty 2)|Y
01|134044|2|1|Please ask customer if they have a wrench for close|Y
01|134047|1|1|** Balance due in Oct 2020|Y
01|134057|2|1|Lead time will be 2-5 days ARO|Y
01|134077|2|1|Our Questionnare will need to be completed and approved|Y
01|134077|2|2|prior to our accepting new order|Y
01|134082|1|1|Tooling Certificate Number:|Y
01|134111|3|1|wrench for both items above|Y
01|134116|1|1|HSK63A-HC20-5.91-IDU with chip installed|Y
01|134116|1|2|waiting to confirm chip|Y
01|134116|2|1|HSK63A-HC20-3.94-IDU with chip installed|Y
01|134116|2|2|waiting to confirm chip|Y
01|134116|3|1|HSK63A-HC12-6.30SL-IDU with chip installed|Y
01|134116|3|2|waiting on confirmation of chip|Y
01|134116|4|1|HSK63A-HC6-6.30SL-IDU with chip installed|Y
01|134116|4|2|waiting on confirmation of chip|Y
01|134116|5|1|HSK63A-C1.1/4-110-IDU with chip installed|Y
01|134116|5|2|waiting on chip confirmatiopn|Y
01|134116|6|1|Waiting on confirmation this chip is okay|Y
01|134116|6|2|Customer wants chip installed by Lyndex Nikken|Y
01|134121|1|1|TC #25000-2549-012720|Y
01|134123|2|1|89.91mm gl|Y
01|134136|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|134137|1|1|200MM High Speed table without left hand mounted motor.|Y
01|134137|1|2|Includes: 200mm face plate|Y
01|134139|2|1|HSK50A-HC12-90|Y
01|134139|2|2|HSK50A 12mm Hyd chuck GL90|Y
01|134144|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|134147|2|1|Discount is the same for quantities of 2-10.|Y
01|134149|1|1|Similar to CNC803FA but with customer provided motor|Y
01|134149|1|2|MELD Manufacturing Corp to provide motor mounting|Y
01|134149|1|3|information|Y
01|134149|2|1|Similar to CNC1600FA but with customer provided motor|Y
01|134149|2|2|MELD Manufacturing Corp to provide motor mounting info|Y
01|134158|1|1|Reference RGA# LVR-55288|Y
01|134158|1|2|Repair of MNL12-ER32Z-MS s/n: A0220 (Alps# T32216)|Y
01|134158|1|3|MNL12-ER32X s/n: A1513 (Alps# T32206)|Y
01|134158|2|1|Bearings o-rings collet nuts and spindles/gears to be|Y
01|134158|2|2|replaced. **We will try to clean up the original gears/|Y
01|134158|2|3|spindles and re-use; however we will not be able to|Y
01|134158|2|4|tell if it will be reuseable until assembled and test|Y
01|134158|2|5|run. If we are able to re-use the price'll be $1606.80|Y
01|134158|4|1|Repair of MNL12-ER32X s/n: A1513 (Alps# T32206)|Y
01|134158|5|1|Bearings o-rings collet nuts and spindle to be|Y
01|134158|5|2|replaced. If the original spindle is reuseable|Y
01|134158|5|3|the price will be $807.20|Y
01|134163|37|1|2 Weeks|Y
01|134163|38|1|2 Weeks|Y
01|134168|1|1|Nose Diameter - 41.75mm; G/L - 100mm|Y
01|134168|2|1|Nose Diameter - 50mm; G/L - 120mm|Y
01|134174|1|1|comes w/ 2 (same taper) shrink fit pot for cooling|Y
01|134174|1|2|station|Y
01|134190|2|1|S-BT40-FMA31.75CS-45-M|Y
01|134190|2|2|BT40 1.1/4 Face / Shell Mill Holder Special Lock Bolt|Y
01|134190|2|3|Cutter body # I112652-N-N|Y
01|134190|2|4|Special Order Item.|Y
01|134190|3|1|Hard Balance Cost|Y
01|134190|3|2|Net Charge to assemble and hard balance to 10000 RPM.|Y
01|134190|3|3|Net Price Each.|Y
01|134195|1|1|This item is not returnable once it's been shipped.|Y
01|134219|1|1|Control Options Required:|Y
01|134219|1|2|4th axis Software and 2 Spare M-codes must be present|Y
01|134219|1|3|and functional at time of Installation.|Y
01|134234|2|1|*new part#|Y
01|134234|3|1|*new part#|Y
01|134234|5|1|*new part#|Y
01|134234|7|1|L&N part# for BT30 60-degree coolant pull stud|Y
01|134256|1|1|COOLANT THRU WILL BE USED ON THESE HOLDERS|Y
01|134256|2|1|NO COOLANT THRU WILL BE USED FOR THIS HOLDER|Y
01|134288|6|1|NO ALTERNATIVE FOR THIS TOOL IN STOCK|Y
01|134288|10|1|COOLANT THRU WILL BE USED ON THESE HOLDLERS|Y
01|134288|11|1|NO COOLANT THRU WILL BE USED ON THIS HOLDER|Y
01|134288|16|1|NO ALTERNATIVE FOR THIS TOOL (X AXIS OFFSET SUB SP)|Y
01|134323|2|1|*** x2 Factory stock 2-3 Weeks x1 3-4 weeks x2|Y
01|134323|2|2|9-10 weeks After receipt of order***|Y
01|134330|1|1|Reference RGA# CUR-55315|Y
01|134330|1|2|Repair of CAT40U-NX5-153 s/n:MBZB-052|Y
01|134337|1|1|Old part #HSK63A-MMC*C-107-A|Y
01|134342|4|1|Laser Mark Tool Holder: CS-027-090-001/Rev 002|Y
01|134345|2|1|Collet for Bullseye Holder|Y
01|134345|3|1|6MM Collet for MMC Holder in house|Y
01|134346|2|1|Special P/N: C5007-0015|Y
01|134346|2|2|CAT50 15 Blank Bar  3.88 Dia|Y
01|134346|3|1|P/N: C5008-0015|Y
01|134346|3|2|CAT50 15 Blank Bar 3.88 Dia.|Y
01|134348|1|1|CAT50-SF0500-9.00CP >> CAT50 CAT50 1/2 Shrink Fit|Y
01|134348|1|2|Holder with 9 gage length and coolant ports.|Y
01|134348|1|3|Quoted at Net Price|Y
01|134348|3|1|CAT50-SF0500-9.00 >> CAT50 CAT50 1/2 Shrink Fit|Y
01|134348|3|2|Holder with 9 gage length.|Y
01|134348|3|3|Quoted at Net Price|Y
01|134351|7|1|Please Note: Buy a BT30 holder and get the matching|N
01|134351|7|2|taper retention knob for $5.00 Net.|N
01|134352|3|1|Installation includes: drive unit short bar fiber|Y
01|134352|3|2|optic cables communication cables bulk head cable|Y
01|134352|3|3|set external cable set parameter changes service|Y
01|134352|3|4|time and travel|Y
01|134372|2|1|T3 - FORM MILL - SIEM 1 5FL ROUGHING CUTTER ST2741|Y
01|134372|2|2|CROSS FROM BK BCV40 MEGA 1.00DS-3.5|Y
01|134372|3|1|T7 - CUSTOM DRILL - SECO - CUSTOM 3.8ODX3MM LOC 45DEG|Y
01|134372|3|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|4|1|COLLET FOR ABOVE HOLDER|Y
01|134372|4|2|CROSS FOR BK NBC10-8AA|Y
01|134372|5|1|T9 - ENDMILL - DATA FLUTE - 1/8 EM W/ 3/8 SHANK|Y
01|134372|5|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|6|1|COLLET FOR ABOVE HOLDER|Y
01|134372|6|2|CROSS FROM BK NBC10-9.5AA|Y
01|134372|7|1|T15 - ENDMILL - MA FORD 1/4 4 FL TUFFCUT|Y
01|134372|7|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|8|1|COLLET FOR ABOVE HOLDER|Y
01|134372|8|2|CROSS FROM BK NBC10-6.5AA|Y
01|134372|9|1|T16 - CUSTOM FORM ENDMILL - SECO|Y
01|134372|9|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|10|1|COLLET FOR ABOVE HOLDER|Y
01|134372|10|2|CROSS FROM BK NBC10-8AA|Y
01|134372|11|1|T18 - ENDMILL MA FORD 1/4 4 FL TUFFCUT|Y
01|134372|11|2|CROSS FROM BK BCV40-10N-5|Y
01|134372|12|1|COLLET FOR ABOVE HOLDER|Y
01|134372|12|2|CROSS FROM BK NBC10-6.5AA|Y
01|134372|13|1|T21 - ENDMILL - DATA FLUTE 4FL .008 RAD 3/16|Y
01|134372|13|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|14|1|COLLET FOR ABOVE HOLDER|Y
01|134372|14|2|CROSS FROM BK NBC10-5AA|Y
01|134372|15|1|T26 - ENDMILL - SECO 100MM 553100R050Z3.0|Y
01|134372|15|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|16|1|COLLET FOR ABOVE HOLDER|Y
01|134372|16|2|CROSS FROM BK NBC10-10AA|Y
01|134372|17|1|T27 - CUSTOM ENDMILL SECO R27.94 FORM MILL|Y
01|134372|17|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|18|1|COLLET FOR ABOVE HOLDER|Y
01|134372|18|2|CROSS FROM BK NBC10-10AA|Y
01|134372|19|1|T28 - DRILL SECO CUSTOM DRILL RD-S3CEU-C116902|Y
01|134372|19|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|20|1|COLLET FOR ABOVE HOLDER|Y
01|134372|20|2|CROSS FROM BK NBC10-5AA|Y
01|134372|21|1|T29 - THREADMILL CARMEX M3X.6 THREADMILL MTS0250C30|Y
01|134372|21|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|22|1|COLLET FOR ABOVE HOLDER|Y
01|134372|22|2|CROSS FROM BK NBC10-6.5AA|Y
01|134372|23|1|T30/T30.02 - ENDMILL SECO 2MM OD W/ .025|Y
01|134372|23|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|24|1|COLLET FOR ABOVE HOLDER|Y
01|134372|24|2|CROSS FROM BK NBC10-6AA|Y
01|134372|25|1|T31/T31.02 - BALL ENDMILL SECO .5MM BALLNOSE|Y
01|134372|25|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|26|1|COLLET FOR ABOVE HOLDER|Y
01|134372|26|2|CROSS FOR BK NBC10-3.175AA|Y
01|134372|27|1|T32 - BALL ENDMILL SECO 3MM BALLNOSE|Y
01|134372|27|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|28|1|COLLET FOR ABOVE HOLDER|Y
01|134372|28|2|CROSS FROM BK NBC10-6AA|Y
01|134372|29|1|T33 - ENDMILL SECO 3MM W/ .035|Y
01|134372|29|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|30|1|COLLET FOR ABOVE HOLDER|Y
01|134372|30|2|CROSS FROM BK NBC10-6AA|Y
01|134372|31|1|T34 - ENDMILL SECO 3MM EM W/ .035|Y
01|134372|31|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|32|1|COLLET FOR ABOVE HOLDER|Y
01|134372|32|2|CROSS FROM BK NBC10-6AA|Y
01|134372|33|1|T35 - BALL MILL SIEM 3/4 CARBIDE 2FL 30 DEG HELIX|Y
01|134372|33|2|CROSS FROM BK BCV40-MEGA20N-4|Y
01|134372|34|1|COLLET FOR ABOVE HOLDER|Y
01|134372|34|2|CROSS FROM BK NBC20-19AA|Y
01|134372|35|1|T36 - CUSTOM ENDMILL SECO R27.94 FORM MILL|Y
01|134372|35|2|CROSS FROM BK BCV40-MEGA10N-5|Y
01|134372|37|1|T38 - 1/2 END MILL SECO W/ .03CR 1 LOC|Y
01|134372|37|2|CROSS FROM BK BCV40-MEGA20N-4|Y
01|134372|38|1|COLLET FOR ABOVE HOLDER|Y
01|134372|38|2|CROSS FROM BK NBC20-13AA|Y
01|134372|39|1|T39 - 1/2 END MILL SECO W/ .03CR 1 LOC|Y
01|134372|39|2|CROSS FROM BK BCV40-MEGA20N-4|Y
01|134372|40|1|COLLETS FOR ABOVE HOLDER|Y
01|134372|40|2|CROSS FROM BK NBC20-13AA|Y
01|134372|41|1|T40 - BALL MILL 3/4 2 FLT END MILL W/ RADIUS 0 DEG|Y
01|134372|41|2|CROSS FROM BK BCV40-MEGA20N-4|Y
01|134372|42|1|COLLET FOR ABOVE HOLDER|Y
01|134372|42|2|CROSS FROM BK NBC20-19AA|Y
01|134372|44|1|WRENCH FOR NCAT40-SK10C-120UP-IDU HOLDERS|Y
01|134372|45|1|WRENCH FOR NCAT40-SK20C-120UP-IDU HOLDERS|Y
01|134372|46|1|WRENCH FOR NCAT40-C1-85UG-IDU HOLDERS|Y
01|134377|1|1|TOOLING CERTIFICATE REFERENCING QUOTE 134372|Y
01|134378|1|1|EST 16 WKS|Y
01|134406|2|1|NC5-46 holders pull stud replacement cost.|Y
01|134406|2|2|When the pull stud is changed the pre-load of the|Y
01|134406|2|3|taper cone needs to be re-checked with the special|Y
01|134406|2|4|pressure gage for NC5 holder and adjusted pre-load.|Y
01|134430|1|1|Part#S.MHA40-A Desc: Quick Change Holder Boxed Set|Y
01|134462|1|1|Right Angle Head Engineering Form Required|Y
01|134462|1|2|Before Shipment|Y
01|134471|1|1|Direct Drive Mitsubishi table.|Y
01|134484|1|1|Pricing Reflects Onetime Test Value|Y
01|134484|1|2|Items non-returnable|Y
01|134484|9|1|Pricing Reflects Onetime Test Value|Y
01|134484|9|2|Items non-returnable|Y
01|134513|2|1|Our Questionnare will need to be completed and approved|Y
01|134513|2|2|prior to our accepting new order|Y
01|134516|2|1|22 pcs due 4/7 balance by June 15th|Y
01|134516|7|1|Balance 12-14 weeks ARO|Y
01|134516|11|1|I ADDED THE SK10 AND BULLSEYE COLLETS TOGETHER;|Y
01|134516|11|2|THEY BOTH ARE SK10 HOLDERS; THE BULLSEYE JUST HAS|Y
01|134516|11|3|ADJUSTMENT CAMS TO REDUCE RUNOUT MANUALLY.|Y
01|134525|1|1|Tooling Certificate Number:  13687-2618-032620|Y
01|134527|4|1|For Pneumatic Tailstock. Air lines & fittings included.|Y
01|134531|1|1|TAM229416 Special CAT50 3/4 End Mill Holder|Y
01|134531|1|2|Per Pratt & Whitney drawing.|Y
01|134531|1|3|Quoted at NET price.|Y
01|134537|1|1|Tosnuc Motor#MTMA402 Installation cost at L-N Facility.|Y
01|134537|1|2|MotorFlange MotorGear MotorCover and etc. included.|Y
01|134537|4|1|Unit price each. Special order.|Y
01|134542|7|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|134544|1|1|Reference RGA# LVR-55341|Y
01|134544|1|2|Repair of OKE4-ER40Z s/n: AL0089 (Alps# OKA01-14000 )|Y
01|134544|1|3|The tool is making a loud grinding noise when it runs.|Y
01|134544|1|4|Customer removed the tool and rotated it manually and|Y
01|134544|1|5|could hear a slip in the gears inside.|Y
01|134544|2|1|Bearings O-rings Collet nut gears and spindle to be|Y
01|134544|2|2|replaced. ***We will try to clean up the original|Y
01|134544|2|3|gears or spindle and re-use; however we will not be|Y
01|134544|2|4|able to tell if it will be re-usable until assembled|Y
01|134544|2|5|and test run. If we are able to re-use the price will|Y
01|134544|2|6|be $1565.60|Y
01|134546|1|1|Includes interface|Y
01|134546|3|1|includes interface|Y
01|134561|1|1|H80F-SF0250-2.36B|Y
01|134561|1|2|HSK80F 1/4 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|134561|1|3|Pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|134561|2|1|H80F-SF0250-3.00B|Y
01|134561|2|2|HSK80F 1/4 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|134561|2|3|pin.RFID Chip Supplied by Centra/Installed at factory.|Y
01|134561|3|1|H80F-SF0375-2.56B|Y
01|134561|3|2|HSK80F 3/8 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|134561|3|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|134561|4|1|H80F-SF0375-3.00B|Y
01|134561|4|2|HSK80F 3/8 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|134561|4|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|134561|5|1|H80F-SF0500-2.95B|Y
01|134561|5|2|HSK80F 1/2 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|134561|5|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|134561|6|1|H80F-SF0500-6.00B|Y
01|134561|6|2|HSK80F 1/2 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|134561|6|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|134561|7|1|H80F-SF0750-3.15B|Y
01|134561|7|2|HSK80F 3/4 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|134561|7|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|134561|8|1|H80F-SF0750-6.00B|Y
01|134561|8|2|HSK80F 3/4 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|134561|8|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|134561|9|1|H80F-SF1000-2.75B|Y
01|134561|9|2|HSK80F 1in Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|134561|9|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|134561|10|1|HSK80F-ER20-2.95B|Y
01|134561|10|2|HSK80F ER20 HiTorq Bearing Collet Chuck Pre-Balanced|Y
01|134561|10|3|and Balanceable.With Makino Pins|Y
01|134561|11|1|HSK80F ER40 HiTorq Bearing Nut  w/DrivePins|Y
01|134561|11|2|RFID Chip Supplied by Centra/Installed at factory.|Y
01|134563|5|1|INSTALLATION OF BOTH CNC-180 TABLES|Y
01|134563|5|2|INCLUDING SERVO MOTORS INTERNAL CABLES EXTERNAL POWER|Y
01|134563|5|3|FEEDBACK CABLES SET 2 DRIVES FIBRE OPTIC CABLES|Y
01|134563|5|4|ALL CONNECTORS TRAVEL LODGING|Y
01|134563|5|5|NOT INCLUDED IS FANUC COST FOR ADDITIONAL AXIS PARAMETE|Y
01|134570|1|1|Tooling Certificate Number: 13220-XXXX-|Y
01|134592|5|1|ref. Royal wrench|Y
01|134604|3|1|Installation includes: Drive unit short bar fiber|Y
01|134604|3|2|optic cable communications cable bulkhead cables|Y
01|134604|3|3|external cables parameter changes service time and|Y
01|134604|3|4|travel.|Y
01|134615|4|1|Riser to make it 310mm Center Height to match CNC601|Y
01|134615|5|1|Installation of Table + Hydraulic Unit|Y
01|134615|5|2|Machine must have atleast 1 Spare M-Code and ladder|Y
01|134615|5|3|If using RS232 customer must have Macro Function too.|Y
01|134618|3|1|**Pending if we can use existing Amps & Cables|Y
01|134624|3|1|Installation includes: drive unit short bar fiber|Y
01|134624|3|2|optic cables communication cables bulk head cable|Y
01|134624|3|3|set external cable set parameter changes service|Y
01|134624|3|4|time and travel|Y
01|134624|5|1|** $1000 LIST price Lyndex-Nikken tool cert **|Y
01|134624|5|2|This is for Home Shop in Louisville KY|N
01|134628|2|1|Please confirm with customer this is a replacement to|Y
01|134628|2|2|prior purchase.If this is a new application we will|Y
01|134628|2|3|need approval.|Y
01|134636|1|1|Discontinued item limited stock replacement quoted on|Y
01|134636|1|2|line 4|Y
01|134636|4|1|This replaces C40S7-0016-2.25|Y
01|134649|9|1|Sub for NC4001-0750-4.00CP in stock|Y
01|134678|1|1|ROTARY TABLE PLUS ALPHA 21 CONTROLLER|Y
01|134678|1|2|FINAL PART NUMBER WILL BE CNCZ321AA21-1800W|Y
01|134678|1|3|THE Z HIGH SPEED VERSION OF THIS TABLE IS IN STOCK|Y
01|134678|1|4|AND PRICING IS THE SAME. MAKE SURE THAT PO REFLECTS|Y
01|134678|1|5|PART NUMBER CNCZ321AA21-1800W IF ORDER IS RECEIVED.|Y
01|134678|1|6|SPEED OF ROTATION IS 44.4 RPM ON THE HIGH SPEED TABLE|Y
01|134678|5|1|INSTALLATION OF ROTARY TABLE + HYDRAULIC UNIT|Y
01|134678|5|2|MACHINE MUST HAVE AT LEAST (1) SPARE M-CODE AND|Y
01|134678|5|3|LADDER. IF USING RS232 CUSTOMER MUST HAVE MACRO|Y
01|134678|5|4|FUNCTION AS WELL.|Y
01|134679|1|1|Tool Cert #13687-2610-031620|Y
01|134679|2|1|Tool Cert #13687-2611-0312620|Y
01|134679|14|1|3pc stock1pc B/O for 1 week|Y
01|134691|2|1|Lyndex-Nikken to make position block.|Y
01|134691|2|2|Delivery is from receipt of spindle drawing info|Y
01|134703|1|1|Material Tolerance: +0/-.004 TIR: 0.0007|Y
01|134713|1|1|200MM Table with removable face plate.|Y
01|134717|1|1|Internal Coolant|Y
01|134717|3|1|*no coolant through|Y
01|134717|5|1|Lyndex-Nikken to make position block.|Y
01|134717|5|2|Delivery is from receipt of spindle drawing info|Y
01|134730|1|1|BT50-FMH22-47-200 BT50 Face Mill Arbor|Y
01|134730|1|2|Quoted at Net Price|Y
01|134730|2|1|BT50-FMH22-47-250 BT50 Face Mill Arbor|Y
01|134730|2|2|Quoted at Net Price|Y
01|134731|1|1|200MM Table with removable face plate.|Y
01|134761|2|1|Free of charge per BobB|Y
01|134775|3|1|Standard pitch= 82mm|Y
01|134778|10|1|P/N: C5026-0375B is available as alternative|Y
01|134778|10|2|CAT50  3/8 End Mill Holder 6.00 gage length|Y
01|134778|10|3|includes a balanceable feature to re-balance|Y
01|134778|10|4|NOTE: All holders are mfg PRE-Balanced|Y
01|134824|1|1|Discontinued Item 1 in stock. If no stock ARO alt item|Y
01|134824|1|2|is NC5001-1500-4.00CP and is quoted on line 2|Y
01|134824|2|1|Replacement for NC5011-1500-4.00|Y
01|134825|3|1|Installation includes: Dual axis drive fiber optic|Y
01|134825|3|2|cables communications cables bulkhead cables|Y
01|134825|3|3|external cables parameter changes service time and|Y
01|134825|3|4|travel.|Y
01|134831|3|1|*new style with coolant ports|Y
01|134832|3|1|SK Nut Wrench|Y
01|134832|4|2|Spindle Wrench|Y
01|134839|1|1|Reference RGA# LVR-55104 Hold till 10/1 per customer|Y
01|134839|1|2|Repair of MNL12-ER11(X)-SUB-SP s/n: 90712 01|Y
01|134839|1|3|(Mimatic# 183938)|Y
01|134839|2|1|Bearings Seals O-rings damaged ER spindle and|Y
01|134839|2|2|Spindle spur gear to be replaced.|Y
01|134839|4|1|Repair of MNL12-ER11(X)-SUB-SP s/n: 81998 02|Y
01|134839|4|2|(Mimatic# 183938)|Y
01|134839|5|1|Bearings Seals O-rings damaged ER Spindle Spindle|Y
01|134839|5|2|spur gear to be replaced|Y
01|134839|7|1|Repair of NL12-ER11(X)-SUB-SP s/n: 87119 01|Y
01|134839|7|2|(Mimatic# 183938)|Y
01|134839|8|1|Bearings Seals O-rings damaged ER Spindle Spindle|Y
01|134839|8|2|spur gear and Chrome grind input spindle to be replaced|Y
01|134861|1|1|Delivery: 6Stk-7 1-2WK BAL 8-9 Weeks|Y
01|134877|1|1|VMK8-3/32 size collet Lead 3-3.5 months ARO|Y
01|134877|1|2|Non standard special not cancelable nor returnable once|Y
01|134877|1|3|ordered|Y
01|134877|1|4|Price is NET price|Y
01|134878|1|1|Reference RGA# LVR-55048|Y
01|134878|1|2|Repair of OKL3-ER32X s/n: AL752 (Alps# OK101-14000)|Y
01|134878|2|1|Bearings seals o-rings collet nut small parts to be|Y
01|134878|2|2|replaced.|Y
01|134881|8|1|Lyndex-Nikken to make block.|Y
01|134881|8|2|Delivery is from receipt of spindle drawing info.|Y
01|134885|3|1|LYNDEX NIKKEN WILL USE MOTOR WE HAVE IN STOCK FOR THIS|Y
01|134885|3|2|REPLACEMENT|Y
01|134889|5|1|5/16 is equal to M8|Y
01|134889|5|2|We do not carry ER16 tap collet in 3/8 (M10)|Y
01|134889|7|1|5/8 is equal to M16|Y
01|134899|3|1|SK Nut Wrench|Y
01|134899|4|2|Spindle Wrench|Y
01|134900|1|1|Reference RGA# LVR-55327|Y
01|134900|1|2|Repair of MZQT5-ER40X-OFF-ICE s/n: 81593 02|Y
01|134900|1|3|(Mimatic# 189956)|Y
01|134900|2|1|Bearings seals o-rings and chrome/grind input spindle|Y
01|134900|2|2|to be replaced.|Y
01|134910|1|1|We do not offer a 5/16 size in the QCFC80 series|Y
01|134913|1|1|Reference RGA# LVR-55146|Y
01|134913|1|2|Repair of MNL12-ER32X-ICE-10K s/n: 18901141 02|Y
01|134913|1|3|(Mimatic#100876)|Y
01|134913|2|1|Bearings seals o-rings coolant sealing bushings and|Y
01|134913|2|2|threading to be replaced|Y
01|134919|1|1|Reference RGA# LVR-55123|Y
01|134919|1|2|Repair of MZQT47-ER32X-OFF s/n: 39259 01|Y
01|134919|1|3|(Mimatic# 124034)|Y
01|134919|2|1|Bearings seals o-rings and outer threadring to be|Y
01|134919|2|2|replaced.|Y
01|134921|1|1|Replacement to discontinued C4005-0562-4.47|Y
01|134955|1|1|Will not be returnable|Y
01|134955|2|1|Will not be returnable|Y
01|134955|3|1|Will not be returnable|Y
01|134955|4|1|Will not be returnable|Y
01|134998|2|1|Installation includes: Dual axis drive short bar|Y
01|134998|2|2|fiber optic cable communications cables bulkhead|Y
01|134998|2|3|cables externcal cables parameter changes service|Y
01|134998|2|4|time and travel.|Y
01|134998|4|1|Installation includes: Drive unit short bar fiber|Y
01|134998|4|2|optic cable communications cable bulkhead cables|Y
01|134998|4|3|external cables parameter changes service time and|Y
01|134998|4|4|travel.|Y
01|135059|6|1|INCLUDES DRIVE CABLES WIRE HARNESS FIBER OPTICS|Y
01|135059|6|2|ALL CONNECTORS TRAVEL LABOR|Y
01|135059|6|3|NEED TO CONFIRM 4TH AXIS PARAMETERS/SOFTWARE AND SPARE|Y
01|135059|6|4|M CODES AVAILABLE.PLEASE ADD AXIS EXPANSION IF NOT|Y
01|135059|6|5|AVAILABLE|Y
01|135068|2|1|Delivery Balance 8pcs Mid July|Y
01|135073|1|1|VDI40 LIVE DIN10889/69880 GDM65; STRAIGHT;ER32 INT/EXT|Y
01|135073|1|2|COOLANT; 1015PSI L1=92mm;1:1 GEAR RATIO; MAX80Nm;|Y
01|135073|1|3|MAX 6500 RPM; Ref Drwg#00036162; MIM Q# A20101315;|Y
01|135073|1|4|MIM P/N 171996|Y
01|135073|3|1|VDI40 LIVE DIN10889/69880 GDM65; STRAIGHT;ER32 INT/EXT|Y
01|135073|3|2|COOLANT; 1015PSI L1=92mm;1:1 GEAR RATIO; MAX80Nm;|Y
01|135073|3|3|MAX 6500 RPM; Ref Drwg#00036162; MIM Q# A20101315;|Y
01|135073|3|4|MIM P/N 171996|Y
01|135073|5|1|VDI40 LIVE DIN10889/69880 GDM65; STRAIGHT;ER32 INT/EXT|Y
01|135073|5|2|COOLANT; 1015PSI L1=92mm;1:1 GEAR RATIO; MAX80Nm;|Y
01|135073|5|3|MAX 6500 RPM; Ref Drwg#00036162; MIM Q# A20101315;|Y
01|135073|5|4|MIM P/N 171996|Y
01|135079|1|1|Has internal threads|Y
01|135093|3|1|Power and Feedback Cables for 4th and 5th|Y
01|135094|2|1|We have stock going through inspectionI will need to|Y
01|135094|2|2|check tomorrow to see if we can pull one to ship RED|Y
01|135108|5|1|Installation kit includes: Drive unit short bar fiber|Y
01|135108|5|2|optic cable communications cable bulkhead cables and|Y
01|135108|5|3|external cables.|Y
01|135111|1|1|Includes Haas Motor and Cable Set|Y
01|135111|2|1|**Needed for Hydraulic Clamping|Y
01|135136|39|1|P/N: CAT50-SK16-250U-IDU|Y
01|135136|39|2|10 WEEKS TO MANUFACTURE|Y
01|135136|39|3|4 WEEKS ON BOAT SHIPPING|Y
01|135136|40|1|P/N: CAT50-SK10-250U-IDU|Y
01|135136|40|2|10 WEEKS TO MANUFACTURE|Y
01|135136|40|3|4 WEEKS ON BOAT|Y
01|135153|1|1|** With purchase of a new 5AX-130FA **|Y
01|135168|1|1|CNCZ180LYA SN: 20259T|Y
01|135168|1|2|TAR-55383|Y
01|135168|1|3|Customer sending in for excessive backlash|Y
01|135175|1|1|Ref:RGA#TAR-50577|Y
01|135175|1|2|Repair of 5AX-130YA SN#1864|Y
01|135175|1|3|Send in for evaluation.|Y
01|135175|27|1|Original Labor is 35hrs taking 5hrs off to offset|Y
01|135175|27|2|previous repair/inspection fee.|Y
01|135175|28|1|Must be replaced due to external damage.|Y
01|135175|29|1|Must be replaced due to external damage.|Y
01|135189|1|1|NET price|Y
01|135225|1|1|Reference RGA# LVR-55352|Y
01|135225|1|2|Repair of MZQT47-ER32Z-MS-OFF s/n: 73987 02|Y
01|135225|1|3|(Mimatic# 183779)|Y
01|135225|2|1|Bearings Seals O-rings damaged Input Spindle and|Y
01|135225|2|2|Intermediate Housing to be replaced.|Y
01|135242|1|1|CAT40-ZH12CH-80Synchronized Tapping Holder CAT40 taper|Y
01|135242|1|2|Price is at NET Pricing|Y
01|135242|1|3|Once ordered this item will not be cancelable nor|Y
01|135242|1|4|returnable|Y
01|135242|2|1|CAT40-ZH16CH-95Synchronized Tapping Holder CAT40 taper|Y
01|135242|2|2|Price is NET price|Y
01|135242|2|3|Once ordered this item will not be cancelable nor|Y
01|135242|2|4|returnable|Y
01|135242|3|1|CAT40-ZH24CH-105Sychronized Tapping Holder CAT40 taper|Y
01|135242|3|2|Price is NET price|Y
01|135242|3|3|Once ordered this item will not be cancelable nor|Y
01|135242|3|4|returnable|Y
01|135287|2|1|TWO HOLE DIN MODIFICATION. PRICE IS NET TO QTS|Y
01|135290|3|1|4.72 gl|Y
01|135292|1|1|Item is given in terms of net pricing.|Y
01|135295|3|1|TO COMPLETE THIS PART NUMBER PLEASE ADD HAVE SERVICE|Y
01|135295|3|2|SWAP THE NUT TO INCLUDE P/N: E32-NUT|Y
01|135307|1|1|Tooling Certificate Number:  E8165-2557-020320|Y
01|135307|4|1|HSK63F-SK16-90P|Y
01|135307|5|1|HSK63F-SK10C-105P|Y
01|135307|6|1|HSK63F-C20-95G|Y
01|135312|1|1|NCAT40-SF0250-4.00CP|Y
01|135312|2|1|NCAT40-SF0250-4.00CP|Y
01|135312|4|1|NCAT40-SF0375-4.00CP|Y
01|135312|5|1|NCAT40-SF0375-4.00CP|Y
01|135312|7|1|NCAT40SF0500-4.00CP|Y
01|135312|8|1|NCAT40SF0500-4.00CP|Y
01|135312|10|1|NCAT40-SF0625-4.00CP|Y
01|135312|11|1|NCAT40-SF0625-4.00CP|Y
01|135312|13|1|NCAT40-SF0750-4.00CP|Y
01|135312|14|1|NCAT40-SF0750-4.00CP|Y
01|135312|16|1|NCAT50-SF0250-4.00CP|Y
01|135312|17|1|NCAT50-SF0250-4.00CP|Y
01|135312|19|1|NCAT50-SF0375-4.00CP|Y
01|135312|20|1|NCAT50-SF0375-4.00CP|Y
01|135312|22|1|NCAT50-SF0500-4.00CP|Y
01|135312|23|1|NCAT50-SF0500-4.00CP|Y
01|135312|25|1|NCAT50-SF0625-4.00CP|Y
01|135312|26|1|NCAT50-SF0625-4.00CP|Y
01|135312|28|1|NCAT50-SF0750-4.00CP|Y
01|135312|29|1|NCAT50-SF0750-4.00CP|Y
01|135315|7|1|Please Note: Since they requested 13 holders I can|Y
01|135315|7|2|offer 13 knobs at $5.00 net each. If quantity of|Y
01|135315|7|3|holders change I will need to re-quote.|Y
01|135342|2|1|Will not be returnable|Y
01|135342|3|1|Will not be returnable|Y
01|135357|2|1|TO ship on 4/29|Y
01|135360|1|1|One time discount extended due to application issue|Y
01|135360|1|2|Tool holder is non-returnable|Y
01|135375|1|1|H80F-SF0250-2.36B|Y
01|135375|1|2|HSK80F 1/4 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|135375|1|3|Pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|135375|2|1|H80F-SF0250-3.00B|Y
01|135375|2|2|HSK80F 1/4 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|135375|2|3|pin.RFID Chip Supplied by Centra/Installed at factory.|Y
01|135375|3|1|H80F-SF0375-2.56B|Y
01|135375|3|2|HSK80F 3/8 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|135375|3|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|135375|4|1|H80F-SF0375-3.00B|Y
01|135375|4|2|HSK80F 3/8 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|135375|4|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|135375|5|1|H80F-SF0500-2.95B|Y
01|135375|5|2|HSK80F 1/2 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|135375|5|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|135375|6|1|H80F-SF0500-6.00B|Y
01|135375|6|2|HSK80F 1/2 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|135375|6|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|135375|7|1|H80F-SF0750-3.15B|Y
01|135375|7|2|HSK80F 3/4 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|135375|7|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|135375|8|1|H80F-SF0750-6.00B|Y
01|135375|8|2|HSK80F 3/4 Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|135375|8|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|135375|9|1|H80F-SF1000-2.75B|Y
01|135375|9|2|HSK80F 1in Shrink Fit Pre-Balanced/Balanceable Makino|Y
01|135375|9|3|pin. RFID Chip Supplied by Centra/Installed at factory.|Y
01|135375|10|1|HSK80F-ER20-2.95B|Y
01|135375|10|2|HSK80F ER20 HiTorq Bearing Collet Chuck Pre-Balanced|Y
01|135375|10|3|and Balanceable.With Makino Pins|Y
01|135375|11|1|HSK80F ER40 HiTorq Bearing Nut  w/DrivePins|Y
01|135375|11|2|RFID Chip Supplied by Centra/Installed at factory.|Y
01|135395|1|1|HSK63F Shell Mill holder with 3/4 diameter2 GL|Y
01|135395|1|2|new part # HSK63F-SMO750-2.00|Y
01|135395|1|3|5 pc minimum order required quoted at NET price|Y
01|135395|1|4|Special item will not be cancelable nor returnable|Y
01|135395|1|5|once ordered|Y
01|135410|2|1|Wedge Plunger for H01MA12/R-1466|Y
01|135422|5|1|NEW HIGH SPEED 8 DESIGN TABLE. 66.6 RPM WITHOUT|Y
01|135422|5|2|FACEPLATE. 909 Nm. BRAKE TORQUE.|Y
01|135422|7|1|MITS 4TH AXIS KIT: REF P/N RT-INF-MELDAS-KNIGHTS. POWER|Y
01|135422|7|2|FEEDBACK CABLES (TABLE TO BULKHEAD)INTERFACE CABLE|Y
01|135422|7|3|FROM BULKHEAD TO CABINET TOOL RETRACTOR SYLE F 3-6LB|Y
01|135422|7|4|FANUC OPTICAL FBRE CABLE RELAY BULKHEAD COUPLER|Y
01|135422|7|5|W/ONE TOUCH FITTINGS.|Y
01|135422|7|6|NO MITSUBISHI AMP INCLUDED MUST BE PURCHASE FROM|Y
01|135422|7|7|MC MACHINERY|Y
01|135425|1|1|I'll match pricing if this is the one needed..|Y
01|135436|2|1|NET Price|Y
01|135483|3|1|***PLEASE CONFIRM SHANK AND SQUARE OF TAP***|Y
01|135483|3|2|.318 x .238 5/16M7M6.5 Coolant|Y
01|135486|2|1|Cable Set - Not Needed if L-N performs installation|Y
01|135486|3|1|Includes AMP Cable Set Hardware Service Time & Travl|Y
01|135492|11|1|Please Note: But a holder and the matching taper pull|Y
01|135492|11|2|is only $5.00 net each.|Y
01|135514|3|1|COOLANT THROUGH|Y
01|135514|3|2|1:1 GEAR RATIO|Y
01|135514|3|3|10000 RPM SPINDLE - 80Nm TORQUE|Y
01|135529|9|1|Discount reflects a purchase order of 6) SK20 Live Tool|Y
01|135533|1|1|Pointed Center is standard Morse Taper Quill available|Y
01|135533|1|2|must advise when ordering.|Y
01|135535|1|1|REPAIR/EVAL OF TAT-105 SN: 2168|Y
01|135536|1|1|Repair of 5AX-130 SN: 4224|Y
01|135536|1|2|TAR-55306|Y
01|135536|1|3|Bearings/Seals/O-Rings need to be replaced|Y
01|135536|1|4|Worm Wheel/Screw seem in good reuseable condition|Y
01|135538|1|1|3 Gl*|Y
01|135538|4|1|2.50 Gl*|Y
01|135538|5|1|wrench for balanceable holder|Y
01|135547|1|1|Special discount for Pratt & Whitney.|Y
01|135579|7|1|1 STK 2 ETA 2-3 WKS BAL PENDING|Y
01|135589|43|1|THIS IS DUAL CONTACT HOLDER IN THIS GAUGE LENGTH.|Y
01|135593|1|1|Tooling Certificate Number: 25000-2516-121619RT|Y
01|135600|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|135600|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|135639|1|1|KM42-10.3|Y
01|135639|1|2|Item is considered a special and will not be cancelable|Y
01|135639|1|3|nor returnable once an order is accepted|Y
01|135644|1|1|Tooling Certificate Number: 13220-XXXX-|Y
01|135663|1|1|Desc: H037M6 N-1352 replacement|N
01|135663|4|1|Desc: H037M6 N-1352 draw screw replacement (screw only)|N
01|135672|3|1|Ship 1 week after design completion.|Y
01|135672|3|2|Please provide the machine make and model and|Y
01|135672|3|3|necessary dimensional information to create a design|Y
01|135699|2|1|Cable Set|Y
01|135715|2|1|Non coolant option|Y
01|135743|1|1|WITH ALPHA 4 MOTOR TO MATCH EXISTIN DRIVE|Y
01|135747|1|1|Reference RGA# LVR-55398|Y
01|135747|1|2|Repair of OKL3-ER32X s/n: AL755 (Alps# OK101-14000)|Y
01|135747|2|1|Bearings O-rings Collet nut and spindle to be|Y
01|135747|2|2|replaced.***We will try to clean up the original|Y
01|135747|2|3|spindle and re-use;however we will not be able to tell|Y
01|135747|2|4|if it will re-usable until assembled and test run.If we|Y
01|135747|2|5|are able to re-use the price will be $1112.40|Y
01|135747|4|1|Repair of OKL3-ER32Z s/n: AL572 (Alps# OK101-13000)|Y
01|135747|5|1|Bearings O-rings Collet nut and spindle to be|Y
01|135747|5|2|replaced. ***We will try to clean up the original|Y
01|135747|5|3|spindle and re-use;however we will not be able to tell|Y
01|135747|5|4|if it will re-usable until assembled and test run.If we|Y
01|135747|5|5|are able to re-use the price will be $597.60|Y
01|135752|4|1|Installation includes: Drive unitshort barfiber optic|Y
01|135752|4|2|cablecommunications cablebulkhead cables external|Y
01|135752|4|3|cables parameter changes service time and travel.|Y
01|135758|1|1|Customer in Poland(Danfoss Power Solutions)|Y
01|135758|1|2|Currency:USD|Y
01|135765|1|1|Mimatic part# 124619/ 05.1311.7141.505|Y
01|135766|3|1|Includes: Drives parameter changes fiber optic cables|Y
01|135766|3|2|service time and travel.|Y
01|135766|4|1|Full set of Rotary Table Cables|Y
01|135791|4|1|Cable Set|Y
01|135807|2|1|Mike will ask end user if he wants us to check status|Y
01|135807|2|2|of the piece in used inventory|Y
01|135816|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|135816|3|1|HYDRAULIC MANIFOLD PRESSURE REGULATOR FOR AIR/HYD|Y
01|135824|3|1|Installation includes: Drive unit short bar fiber|Y
01|135824|3|2|optic cables communications cable bulkhead cables|Y
01|135824|3|3|external cables parameter changes service time and|Y
01|135824|3|4|travel.|Y
01|135828|1|1|We do not offer an on size version in 6mm|Y
01|135872|2|1|Includes Haas motors and cables.|Y
01|135872|10|1|Installation includes: Parmeter changes time and|Y
01|135872|10|2|travel.|Y
01|135874|1|1|Qty Pricing 1 pc.|Y
01|135874|1|2|Part#MZQT47-ER16X-OFF-HS4|Y
01|135874|1|3|MAZAK LIVE; ER16; HIGHSPEED;|Y
01|135874|1|4|STRAIGHT OFFSET;|Y
01|135874|1|5|V=60mm;|Y
01|135874|1|6|1:4 GEAR; MAX 10Nm;|Y
01|135874|1|7|MAX INPUT 3400 RPM;|Y
01|135874|1|8|MAX OUTPUT 13600 RPM;|Y
01|135874|1|9|EXTERNAL COOLANT|Y
01|135874|1|10|REF DRWG# 00029392|Y
01|135874|3|1|Qty Pricing 2 pc.|Y
01|135877|4|1|Incudes: AMP Cables Parameter Changes Service Time|Y
01|135877|4|2|and Travel.|Y
01|135878|1|1|Reference RGA# 55443|Y
01|135878|1|2|Repair of N5005-0562-4.50|Y
01|135882|1|1|INCLUDED WITH ROTARY TABLE: FACEPLATE BUILT IN TO|Y
01|135882|1|2|TABLE CABLE SET CABLE RETRACATION MANAGEMENT SYSTEM|Y
01|135890|2|1|Includes Haas motors and cables.|Y
01|135890|10|1|Installation includes: Parmeter changes time and|Y
01|135890|10|2|travel.|Y
01|135892|1|1|Reference RGA# TOR-54412|Y
01|135892|1|2|Repair of C40S5-0875|Y
01|135901|4|1|BOOSTER IS OPTIONAL|Y
01|135901|4|2|BREAKING FORCE WITHOUT BOOSTER: 588Nm|Y
01|135901|4|3|BREAKING FORCE WITH BOOSTER: 1568Nm|Y
01|135901|5|1|STANDARD FORGED STEEL CHUCK - NOT SET TRU|Y
01|135901|7|1|HEIDENHAIN SCALE +/-3 SECONDS WITH SCALE ADAPTER KIT|Y
01|135901|7|2|PRICE IS NET TO MDI|Y
01|135901|8|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|135901|8|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|135901|8|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|135901|8|4|TRAVEL|Y
01|135901|9|1|COMPLEMENTARY TOOL CERTIFICATE FOR END USER.|Y
01|135902|1|1|INCLUDES TABLE SERVO MOTORFACEPLATE AIR/HYD BOOSTER|Y
01|135902|1|2|(AY0200) FOR BRAKE SYSTEM|Y
01|135902|5|1|Includes Cables/Cable Management and hardware|Y
01|135902|5|2|associated with the Cable management|Y
01|135906|1|1|HSK80F-C1-shortest GL|Y
01|135906|1|2|On Quote file for P&D|Y
01|135922|3|1|THIS IS A SPECIAL ITEM|Y
01|135946|1|1|Max 30000 RPM|Y
01|135946|7|1|Max 30000 RPM|Y
01|135946|8|1|Max 30000 RPM|Y
01|135946|9|1|Max 30000 RPM|Y
01|135946|18|1|Max 25000 RPM|Y
01|135946|19|1|Max 25000 RPM|Y
01|135948|1|1|GoPro Camera:HERO8 Black Bundle **For Elco's office use|Y
01|135948|1|2|Euro 387.00($1=Euro.92)|Y
01|135948|2|1|GoPro Karma Grip **For Elco's office use|Y
01|135948|2|2|Euro 111.00(EX:$1=Euro.92)|Y
01|135956|19|1|THIS IS DUAL CONTACT HOLDER IN THIS GAUGE LENGTH.|Y
01|135982|1|1|Part#|Y
01|135982|1|2|REPL pilot bushing (#2) for H027M5/H037M5 Chuck|Y
01|136020|1|1|Tool Cert #13687-2609-031620|Y
01|136022|1|1|Modification of CNC180LMA -> CNC180LOSP4-M|Y
01|136022|1|2|SN: 5053|Y
01|136022|1|3|Convert to Okuma New Machine Specification|Y
01|136028|6|1|Can they use NCAT50-SF0750-5.12? 5ea stock|Y
01|136031|1|1|Reference RGA# TAB-53488|Y
01|136031|1|2|5AX-130FA s/n: 5411 Returning for credit|Y
01|136063|1|1|Reference RGA# TOR-54970|Y
01|136063|1|2|The repair cost will exceed the cost of a new|Y
01|136063|1|3|replacement.|Y
01|136066|1|1|Machine Must Come with DDR Drive|Y
01|136066|2|1|Priced using existing DDR drive unit|Y
01|136079|1|1|Tool Cert #13687-2609-031620 overage to 13687-2610 cert|Y
01|136086|1|1|Minimum order 10 pieces|Y
01|136101|1|1|Reference RGA# TOR-55455|Y
01|136101|1|2|Repair of PRE-PART-07EGL|Y
01|136108|1|1|H63A(80)-SF1000-3.375-IDI|Y
01|136108|1|2|HSK63A 80mm Flange 1in Shrink Fit Holder GKN UNV_76|Y
01|136108|1|3|Chip 1778RW installed and toolholder re-balanced|Y
01|136108|1|4|G2.5 @ 25000rpm.|Y
01|136110|1|1|For Triumph Group West Hartford CT|Y
01|136118|1|1|Tool Cert #13687-2606-031320|Y
01|136122|3|1|****Alternate 105mm G.L. 4.13in w/out Coolant Ports****|Y
01|136129|1|1|NET price non cancelable non returnable once oredered|Y
01|136149|1|1|Not cancellable not reternable|Y
01|136149|2|1|Not cancellable not reternable|Y
01|136167|4|1|***This is balanceable holder with 3.50 G.L. Please|Y
01|136167|4|2|confirm Chucking Machine has in-house balancing|Y
01|136167|4|3|capabilities***|Y
01|136167|5|1|***Machine Make & Model Pending***|Y
01|136167|9|1|***Alternate option on requested part#NB4016-1000-4.00|Y
01|136188|8|1|$3000 LYNDEX NIKKEN TOOLING CERTIFICATE AT NO COST|Y
01|136188|8|2|TO METHODS OR MID SOUTH.|Y
01|136188|10|1|4TH/5TH AXIS DRIVES FOR FANUC ROBODRILL MEDIUM BED|Y
01|136188|10|2|PART NUMBERS FOR DRIVES WILL BE DETERMINED ONCE|Y
01|136188|10|3|EXISTING DRIVES ARE VERIFIED IN MACHINE.|Y
01|136189|1|1|Final part number CAT50-C1F-105U-IDU|Y
01|136191|1|1|Quote 10% Off List Price|Y
01|136203|1|1|BT30-SF20-80CP|Y
01|136203|1|2|Quoted as NET pricing|Y
01|136226|2|1|CABLE MANAGEMENT SWING BOX|Y
01|136226|2|2|ALLOWS ROTATION OF B AXIS|Y
01|136226|3|1|EXTENDED LENGTH ECTERNAL POWER AND FEEDBACK|Y
01|136226|3|2|CABLE SET.|Y
01|136226|4|1|PRICE IS NET TO CAMPAT|Y
01|136226|4|2|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|136226|4|3|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|136226|4|4|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|136226|4|5|TRAVEL.|Y
01|136232|1|1|If order is placed by 5/19 should ship by 6/1 weeks|Y
01|136235|3|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|136242|1|1|ref# H037M10|Y
01|136242|1|2|Includes: Std. Soft Jaws with bolts hex wrench|Y
01|136242|1|3|Confirm with the customer if they need BLANK or|Y
01|136242|1|4|THREADED DRAW NUT|Y
01|136250|1|1|Back spot facing tool|N
01|136250|1|2|Material - Steel Rc45-50|N
01|136250|1|3|Od - 1.125 oD - 2.375 T - 2.200 t -.063 h - 18|N
01|136255|2|1|Contains Collet Closer w/Adaptor Plate|Y
01|136263|10|1|$3000 LYNDEX NIKKEN TOOLING CERTIFICATE GIVEN AT|Y
01|136263|10|2|NO COST TO METHODS OR MID-SOUTH. THIS IS A PASS|Y
01|136263|10|3|THROUGH DIRECTLY TO MID-SOUTH|Y
01|136264|1|1|PS-123E included. SP Order. Unit Price Each.|Y
01|136264|2|1|PS-123E included. SP Order. Unit Price Each.|Y
01|136264|3|1|PS-123E included. SP Order. Unit Price Each.|Y
01|136264|4|1|PS-123E included. SP Order. Unit Price Each.|Y
01|136265|1|1|TEST TOOL AT TAMPA BRASS. REPORT ON PERFORMANCE WITHIN|Y
01|136265|1|2|2 WEEKS|Y
01|136316|4|1|** Confirm in-house balancing capabilities**|Y
01|136319|3|1|Installation includes: drive unit short bar fiber|Y
01|136319|3|2|optic cables communication cables bulk head cable|Y
01|136319|3|3|set external cable set parameter changes service|Y
01|136319|3|4|time and travel|Y
01|136324|13|1|Please note: $10.00 net each is with the purchase of a|Y
01|136324|13|2|matching taper holder.|Y
01|136329|6|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|136329|6|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|136329|6|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|136329|6|4|TRAVEL.|Y
01|136357|1|1|C5006-20-3.00DIN-M -CAT50 20mm End Mill Holder with|Y
01|136357|1|2|DIN holes added|Y
01|136366|2|1|Lyndex-Nikken to make position block.|Y
01|136366|2|2|Delivery is from receipt of spindle drawing info|Y
01|136370|1|1|SF-PACKAGE-CT40-STD-CP consists of Shrink Fit Machine|Y
01|136370|1|2|Accessories and 10 CAT40 Shrink Fit Holders with|Y
01|136370|1|3|Coolant Ports in preferred sizes.|Y
01|136378|1|1|Complete set with cable motor amp|Y
01|136378|2|1|Includes motor cable|Y
01|136378|2|2|Does not include amp|Y
01|136389|1|1|Delivery: 22-pcs stock at L-N/ 7-Pcs 1~2 Weeks|Y
01|136389|1|2|Balance of 99 holders 06/19.|Y
01|136390|4|1|Installation includes: Dual axis drive unit short bar|Y
01|136390|4|2|fiber optic cables communications cables bulkhead|Y
01|136390|4|3|cables external cables parameter changes service|Y
01|136390|4|4|time and travel.|Y
01|136413|1|1|Reference RGA# TOR-55501|Y
01|136413|1|2|Repair of PF-2|Y
01|136466|1|1|TAR-55463|Y
01|136466|1|2|CNC321BMA SN: 9509 Getting Overload Alarm|Y
01|136466|1|3|Sent in for Evaluation|Y
01|136477|1|1|KM42-9.3  item is non returnablenon cancelable|Y
01|136487|1|1|Reference RGA# TOR-55503|Y
01|136487|1|2|Repair of 3 x S20-UMT|Y
01|136508|1|1|HSK125A-SF0750-9.00CP|N
01|136508|4|1|HSK125A-SF1000-9.00CP|N
01|136517|2|1|External Power & Feedback Cables|Y
01|136517|4|1|Installation includes - drives parameter changes|Y
01|136517|4|2|bulkhead connections labor & travel|Y
01|136518|4|1|Main sub plate with tapped hole pattern for S700|Y
01|136518|5|1|Rotary table riser with hole pattern to match sub|Y
01|136518|5|2|Ground to match tailstock center height|Y
01|136518|6|1|Tailstock riser plate with hole pattern for easy|Y
01|136518|6|2|adjustment to hand guard lenght|Y
01|136518|7|1|Rotary table 6 riser plate for 18 part swing|Y
01|136518|8|1|Chuck adapter plate for Schunk KPS 250 vise|Y
01|136518|9|1|Schunk KSP Plus 250 vise with one set of KTR250 jaws|Y
01|136525|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|136525|2|1|1 SET of Master Jaws for H01MA15 R-1772|Y
01|136525|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|136525|3|1|#2 Pilot Plate for H01MA15 R-1772|Y
01|136525|3|2|Quoted as NET pricingnon-returnablenon-cancelabe|Y
01|136532|2|1|Special stock item non cancelable nor returnable|Y
01|136565|1|1|Reference RGA# QUA-55339|Y
01|136565|1|2|Repair of MNZ20-SK16Z-12K s/n: 19904122 08|Y
01|136565|1|3|(Mimatic# 196235)|Y
01|136565|2|1|Bearings seals o-rings damaged input spindle and|Y
01|136565|2|2|damaged housing to be replaced. There was visible|Y
01|136565|2|3|evidence of a crash that caused this damage.|Y
01|136574|1|1|180MM twin spindle table with Haas motor and cable set.|Y
01|136615|2|1|COST IS NET TO FACTORY OUT LET TOOLING|Y
01|136617|4|1|3J pneumatic collet closer with cylinder and draw tube.|Y
01|136650|1|1|Special item is non cancelable nor returnable|Y
01|136654|1|1|** Confirm Cust. Has Balance Mach. **|Y
01|136655|1|1|P/N: AC5-ECH7F-90  Polygon C5 ER11 Adapter|Y
01|136655|1|2|7 pieces ETA 3 weeks|Y
01|136655|1|3|13 pieces 9~10 weeks mfg. plus 1 week to ship|Y
01|136673|1|1|Bearings / Seals|Y
01|136673|4|1|Labor cost: $110/hr.|Y
01|136683|5|1|Installation includes: Drive unit short bar fiber|Y
01|136683|5|2|optic cable communications cable bulkhead cables|Y
01|136683|5|3|external cables parameter changes service time and|Y
01|136683|5|4|travel.|Y
01|136683|6|1|Special one time price match due to inventory issue|Y
01|136691|1|1|TC#25000-2409-083019RT|Y
01|136693|6|1|w/ SKN-6WK(GH) nut|Y
01|136693|7|1|w/ SKN-6WKJ(GH) nut|Y
01|136694|1|1|200MM top mount table with Fanuc motor.|Y
01|136694|3|1|3J pneumatic collet closer with cylinder and draw tube|Y
01|136694|4|1|Includes: Dirve unit short abr fiber optic cable|Y
01|136694|4|2|communications cable bulkhead cables external cables|Y
01|136694|4|3|parameter changes service time and travel.|Y
01|136696|1|1|TC# 25000-2593-030420RT|Y
01|136702|2|1|***In stock option please confirm if customer|Y
01|136702|2|2|requires ID Chip Hole for use with baluff chip***|Y
01|136703|1|1|BF120-22-43-TC|Y
01|136703|2|1|BF130-30-52.3-TC|Y
01|136703|3|1|BF130-35-61.4-TC|Y
01|136703|4|1|BF130-42-67.8-TC|Y
01|136707|49|1|PART # CN171R011|Y
01|136707|50|1|INTERNAL WIRE HARNESS|Y
01|136707|50|2|TCE-56042/TCE-94812|Y
01|136707|50|3|TCE-55043/TCE-93547|Y
01|136707|51|1|New External Cables Inside Machine|Y
01|136707|51|2|TCE-94965/TCE-94966|Y
01|136707|51|3|TCE-94957/TCE-94958|Y
01|136713|13|1|**1 shank diameter|Y
01|136713|13|2|**2.28L 2.60L2 1.57D1 1.57D2 0.27T 0.12C|Y
01|136717|10|1|Please Note: Retention knobs can be taken at $5.00 net|Y
01|136717|10|2|each when purchased with the matching taper holder.|Y
01|136717|10|3|6 CAT40 holders/6 retention Knobs 5 Bucks net.|Y
01|136745|31|1|Replaces C40S5-0875-3.90 which is discontinued|Y
01|136754|9|1|Our new standard will come with pluggable coolant ports|Y
01|136756|32|1|Replaces C40S5-0875-3.90 which is discontinued|Y
01|136765|1|1|P/N: MZMP46-ER32-AD-ICE|Y
01|136772|1|1|HSK40A-SF12-135|Y
01|136772|1|2|HSK40A HOLDER 12MM DIA 135MM GL|Y
01|136772|2|1|HSK40A-SF12-135|Y
01|136772|2|2|HSK40A HOLDER 12MM DIA 135MM GL|Y
01|136780|2|1|Optic cables communication cables parameter changes|Y
01|136780|2|2|drives time and travel.|Y
01|136780|3|1|External power/feedback cables|Y
01|136786|1|1|P/N: AC5-ECH7F-90  Polygon C5 ER11 Adapter|Y
01|136786|1|2|7 pieces ETA 3 weeks|Y
01|136786|1|3|13 pieces 9~10 weeks mfg. plus 1 week to ship|Y
01|136796|3|1|Installation includes: Drive unit short bar fiber|Y
01|136796|3|2|optic cable communications cable bulkhead cables|Y
01|136796|3|3|external cables parameter changes service time and|Y
01|136796|3|4|travel.|Y
01|136812|8|1|4TH/5TH AXIS DRIVES FOR FANUC ROBODRILL MEDIUM BED|Y
01|136812|8|2|PART NUMBERS FOR DRIVES WILL BE DETERMINED ONCE|Y
01|136812|8|3|EXISTING DRIVES ARE VERIFIED IN MACHINE.|Y
01|136812|10|1|$3000 LYNDEX NIKKEN TOOLING CERTIFICATE GIVEN AT|Y
01|136812|10|2|NO COST TO METHODS OR MID-SOUTH. THIS IS A PASS|Y
01|136812|10|3|THROUGH DIRECTLY TO MID-SOUTH|Y
01|136821|1|1|Nut for BT35-DW3-105|Y
01|136830|6|1|w/ SKN-6WK(GH) nut|Y
01|136830|7|1|w/ SKN-6WKJ(GH) nut|Y
01|136859|3|1|Please Note: C40S7-0032-1.10R takes a different wrench|Y
01|136859|3|2|than our other ER32 chucks. Wrench-ER32I|Y
01|136866|2|1|BMT85-ER16X-OFF-HS4|Y
01|136872|1|1|TAR-55525|Y
01|136872|1|2|5AX-2002FA-M SN: 2053|Y
01|136872|1|3|Customer had table crash needs evaluation|Y
01|136876|1|1|P/N: MZMP46-ER25-AD-ICE|Y
01|136876|1|2|Mazak MP6100  ER25 Adjustable IntC|Y
01|136911|1|1|Reference RGA# TOR-55554|Y
01|136911|1|2|Repair of PF-2|Y
01|136915|1|1|N5006-2000A-4.531-ID  NMTB50  2.0 End Mill Holder|Y
01|136915|1|2|With Chip Hole Only >> Per UNV#420 Drawing|Y
01|136953|1|1|260MM rotary table with Fanuc Alpha4/5000iF|Y
01|136953|1|2|Motor part number A06B-2223-B000|Y
01|136953|3|1|Installation includes: Drive unit short bar fiber|Y
01|136953|3|2|optic cable communications cable bulkhead cables|Y
01|136953|3|3|external cables parameter changes service time and|Y
01|136953|3|4|travel.|Y
01|136958|1|1|Reference RGA# LVR-55497|Y
01|136958|1|2|Repair of MZQT47-ER16-AD-HS s/n: 29194 02|Y
01|136958|1|3|(Mimatic# 125054)|Y
01|136958|2|1|Bearings Seals O-rings Damaged bevel gears to be|Y
01|136958|2|2|replaced. Chrome/Grind 2 spindles.|Y
01|136959|6|1|Includes Cooling Unit Induction Ring Set Cooling|Y
01|136959|6|2|Bracket Set Storage Racks (2)Chuck Holders & Training|Y
01|136980|2|1|Includes adapter plate|Y
01|136980|5|1|Installation includes: Drive unit short bar fiber|Y
01|136980|5|2|optic cable communications cable bulkhead cables|Y
01|136980|5|3|parameter changes service time and travel.|Y
01|136980|6|1|Special one time price match due to inventory issue|Y
01|137003|5|1|Tooling Credit issued with the purchase of|Y
01|137003|5|2|PRE-E23N-I40|Y
01|137017|2|1|Installation includes: drive unit short bar fiber|Y
01|137017|2|2|optic cables communication cables bulk head cable|Y
01|137017|2|3|set external cable set parameter changes service|Y
01|137017|2|4|time and travel|Y
01|137017|4|1|** Redeemable for $1000 in list price tooling **|Y
01|137019|1|1|TAR-55541 CNC180LFA SN: 10621|Y
01|137019|1|2|Below are parts and labor for repair of this table|Y
01|137019|1|3|Bearings/Seals/Worm Wheel/Worm Screw need replacing|Y
01|137019|30|1|TAR-55541 CNC180LFA SN: 11412|Y
01|137019|30|2|Below are parts and labor for this repair|Y
01|137019|30|3|Bearings/Seals/O-Rings Need to be replaced|Y
01|137032|43|1|THIS IS DUAL CONTACT HOLDER IN THIS GAUGE LENGTH.|Y
01|137054|1|1|Tooling Certificate Number: 13435-2380-080519|Y
01|137072|70|1|0-9/16|Y
01|137072|71|1|5/16-7/8|Y
01|137072|72|1|13/16-1.3/8|Y
01|137072|73|1|0-9/16 hand and 1/8 pipe|Y
01|137072|74|1|5/16-1 hand and 1/4-1/22 pipe|Y
01|137072|75|1|13/16-1.3/8 hand and 1/2-1 pipe|Y
01|137088|1|1|P/N: NBT30-SKT25C-105P|Y
01|137088|1|2|Dual Contact BT30 Taper SK25 Slim Chuck coolant|Y
01|137088|1|3|Hi-Speed|Y
01|137104|1|1|No stock delivery End of July/Early August|Y
01|137113|10|1|In stock alternate to the ZKG12-3/8U|Y
01|137117|1|1|P/N: NBT30-SKT25C-105P|Y
01|137138|2|1|Installation includes: Drive unit short bar fiber|Y
01|137138|2|2|optic cable communications cable bulkhead cables|Y
01|137138|2|3|external cables parameter changes service time and|Y
01|137138|2|4|travel.|Y
01|137141|2|1|Cables included in installation package|Y
01|137141|2|2|Machine must come with DDR Drive installed|Y
01|137153|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|137153|7|1|HYDRAULIC MANIFOLD PRESSURE REGULATOR FOR AIR/HYD|Y
01|137153|11|1|TOOLING CERTIFICATE AT NO COST TO END USER|Y
01|137154|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|137154|4|1|TOOLING CERTIFICATE AT NO COST TO END USER|Y
01|137159|6|1|Quoted as an in stock option.|Y
01|137169|1|1|P/N: NBT30-SKT25C-105P|Y
01|137169|1|2|Dual contact BT30 Taper SK25 slim chuck coolant|Y
01|137169|1|3|hi-speed.|Y
01|137192|1|1|RGA TAR-55499|Y
01|137192|1|2|CNCZ201LSA3 SN: 55499|Y
01|137192|1|3|Customer Sent in for Repair|Y
01|137195|1|1|Pricing for use w/tool cert# 16740-2659-052620|Y
01|137210|1|1|P/N: NBT30-SKT25C-105P|Y
01|137210|1|2|Dual contact BT30 Taper SK25 slim chuck coolant|Y
01|137210|1|3|hi-speed.|Y
01|137213|1|1|Reference RGA# LVR-55562|Y
01|137213|1|2|Repair of OK101-79000 s/n: AL0006 (Alps# OK101-79000)|Y
01|137213|2|1|Bearings o-rings clutch nuts and spindle to be|Y
01|137213|2|2|replaced. ***We will try to clean up the original|Y
01|137213|2|3|spindle and re-use; however we will not be able to|Y
01|137213|2|4|tell if it will be re-usable until assembled and test|Y
01|137213|2|5|run. If we are able to re-use the price will be|Y
01|137226|1|1|There are currently 18pcs in stock in IL. Should add'l|Y
01|137226|1|2|quantity be necessary ETA for balance would be aprox|Y
01|137226|1|3|12 weeks after receipt of order.|Y
01|137235|1|1|May be sold as a tool certificate|Y
01|137244|4|1|New part # replaces SKN-10BJ same item|Y
01|137282|2|1|***11 pcs Stock part#530-012 (3/16) part#530-048 (3/4)|Y
01|137282|2|2|ETA from factory End of June***|Y
01|137306|1|1|NCAT50-HC25-100 CAT50 Taper Plus 25mm Hydraulic Chuck|Y
01|137306|1|2|With 100mm Gage Length|Y
01|137306|2|1|NCAT50-HC20-100 CAT50 Taper Plus 20mm Hydraulic Chuck|Y
01|137306|2|2|With 120mm Gage Length|Y
01|137314|1|1|*1pc pricing|Y
01|137324|3|1|***NOTE*** Special Pricing based on MMC8 Holders|Y
01|137324|3|2|that are required to be returned once order is placed**|Y
01|137324|5|1|**HOT DEALS** DIST Net $251 EU Net $314**|Y
01|137324|6|1|**HOT DEALS** DIST Net $242 EU Net $303**|Y
01|137325|1|1|**HOT DEALS** DIST Net $251 EU Net $314**|Y
01|137325|2|1|**HOT DEALS** DIST Net $242 EU Net $303**|Y
01|137360|1|1|Quoted as NET pricingnonreturnablenon-cancelable|Y
01|137381|1|1|Evaluation of CNC401T SN: 6686|Y
01|137381|1|2|RGA TAR-55540|Y
01|137384|28|1|TAT-400 SN: 1518|Y
01|137384|28|2|RGA TAR-55540|Y
01|137411|2|1|***QTY. Break Pricing 2-3 units***|Y
01|137419|3|1|Installation includes: drive unit short bar fiber|Y
01|137419|3|2|optic cables communication cables bulk head cable|Y
01|137419|3|3|set external cable set parameter changes service|Y
01|137419|3|4|time and travel|Y
01|137423|1|1|Reference RGA# TOR-55600|Y
01|137423|1|2|Repair of 1 x HSK63A-C32-130|Y
01|137435|1|1|BT50-AF2-60-OH|Y
01|137441|6|1|P/N: CAT40-SF0437-3.15CP|Y
01|137441|6|2|CAT40 7/16 Shrink Fit Holder w pluggable coolant ports|Y
01|137445|1|1|Tool Cert #13687-2607-031620|Y
01|137455|1|1|Replacement Table for SN: 2004|Y
01|137455|1|2|Price is reflected of core trade in for original table.|Y
01|137455|1|3|5AX-2MT-170-200FA-M SN: 2004|Y
01|137457|1|1|4-6 weeks ARO. Will need to get gear and Flange|Y
01|137457|3|1|POWER/FEEDBACK EXTERNAL CABLE|Y
01|137458|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|137463|1|1|Reference RGA# LVR-55581|Y
01|137463|1|2|Repair of OKEX-ER32Z-MS s/n: AL0049|Y
01|137463|1|3|(Alps# OKA00-21000-01)|Y
01|137463|2|1|Bearings o-rings collet nuts and gears to be replaced|Y
01|137474|8|1|For 1/2-20 Tap >>.590 Shank X .442 Drive Square|Y
01|137474|9|1|For 5/8-18 Tap >>.480 Shank X .360 Drive Square|Y
01|137474|10|1|For M12 Tap >> 9.0mm Shank X 7.10mm Drive Square|Y
01|137474|20|1|For 1/2-20 Tap >>.367 Shank X .275 Drive Square|Y
01|137474|21|1|For M10 Tap>> 10.omm Shank X 8.0mm Drive Square|Y
01|137474|26|1|For M8 Tap >>6.30 Shank X 5.00 Drive Square|Y
01|137474|27|1|For M6 Tap >>4.50 Shank X 3.55 Drive Square|Y
01|137474|28|1|For 3/8-24 Tap >>.381 Shank X .286 Drive Square|Y
01|137481|1|1|Repair of 5AX-300WXF|Y
01|137481|1|2|Needs new brake seals/O-Rings/and Worm Screw Assy.|Y
01|137481|1|3|Tilt Axis is OK|Y
01|137482|1|1|replaces C40S5-0562-2.93|Y
01|137482|2|1|replaces C40S5-0875-3.90|Y
01|137482|3|1|replaces C40S5-1375-5.75|Y
01|137482|5|1|replaces C40R5-0562-3.02|Y
01|137482|6|1|replaces C40R5-0875-3.66|Y
01|137482|7|1|this item is being discontinued limited inventory|Y
01|137497|1|1|ETA air ship 6/8|Y
01|137503|1|1|Ref tool#T32008|Y
01|137518|1|1|TC# 25000-2551-020320RT|Y
01|137518|1|2|TC# 25000-2567-21120RT|Y
01|137524|3|1|Substitute for NBT40-C1-90|Y
01|137528|2|1|External cable set|Y
01|137529|1|1|INCLUDES AIR/HYD BOOSTER FOR BRAKE|Y
01|137529|2|1|External cable set|Y
01|137530|2|1|Alt for NK103-11000|Y
01|137533|1|1|Wrenches were provided on previous order SO#838795|Y
01|137537|1|1|5AX-4MT-105-120OSP4 is correct part # when ordering|Y
01|137537|1|2|NO WORKHOLDING INCLUDED|Y
01|137537|1|3|DELIVERY 6-8 WEEKS ARO|Y
01|137543|3|1|Substitute for NBT40-C1-90|Y
01|137546|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|137546|1|2|ETA 6-7 wks if ordered by 6/18vendor goes on break|Y
01|137546|1|3|until 8/17 if PO is cut after 6/18 ETA will be|Y
01|137546|1|4|10 WKS|Y
01|137546|2|1|Quoted as NET pricingnonreturnablenon-cancelable|Y
01|137546|2|2|ETA 6-7 WKS if ordered by 6/18|Y
01|137546|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|137546|4|2|ETA 6-7 WKS if order is placed by 6/18|Y
01|137548|1|1|Stock at factory|Y
01|137549|3|1|Substitute for NBT40-C1-90|Y
01|137554|1|1|Reference RGA# TOR-55599|Y
01|137554|1|2|Repair of PF-2|Y
01|137554|4|1|Calibration service included|Y
01|137571|6|1|*external coolant only|Y
01|137574|3|1|On quote file for lead|Y
01|137575|3|1|COMPLETE 6X6 PALLET|Y
01|137575|3|2|PRICE AND ASSEMBLY INCLUDES 1 EA:|Y
01|137575|3|3|TIMING DOWEL JERGENS ZPS STUD AND ENGAGEMENT SCREW|Y
01|137575|3|4|SCHUNK PICK UP STUD 6X6 ALUMINUM PALLET|Y
01|137575|4|1|COMPLETE 6X9 PALLET|Y
01|137575|4|2|PRICE AND ASSEMBLY INCLUDES 1 EA:|Y
01|137575|4|3|TIMING DOWEL JERGENS ZPS STUD AND ENGAGEMENT SCREW|Y
01|137575|4|4|SCHUNK PICK UP STUD 6X9 ALUMINUM PALLET|Y
01|137575|5|1|COMPLETE 9X20 PALLET|Y
01|137575|5|2|PRICE AND ASSEMBLY INCLUDES 2 EA:|Y
01|137575|5|3|JERGENS ZPS STUD AND ENGAGEMENT SCREW|Y
01|137575|5|4|1 EA: SCHUNK PICK UP STUD 9X20 ALUMINUM PALLET|Y
01|137575|6|1|INSTALL INCLUDES INTERFACING WITH DIRECT I/O|Y
01|137575|6|2|AND THE INSTALL OF ADDITIONAL PARTS TOWER|Y
01|137582|2|1|In stock option|Y
01|137595|1|1|Reference RGA# TOR-55596|Y
01|137595|1|2|Repair of PF-2|Y
01|137595|7|1|Calibration will be needed within .0008 of T.I.R.|Y
01|137603|1|1|Note: Item is non standard stock. Once a PO is placed|Y
01|137603|1|2|it can not be cancelled or returned.|Y
01|137604|1|1|Reference RGA# TOR-55585|Y
01|137604|1|2|Repair of CAT50-UMT200|Y
01|137604|3|1|Calibration service included.|Y
01|137607|3|1|Installation includes: drive unit short bar fiber|Y
01|137607|3|2|optic cables communication cables bulk head cable|Y
01|137607|3|3|set external cable set parameter changes service|Y
01|137607|3|4|time and travel|Y
01|137624|1|1|NBT30-SKT16C-75P|Y
01|137624|1|2|2Lock TaperPlus NBT30 SK16 Slim Chuck Coolant|Y
01|137624|1|3|High Speed Rigid|Y
01|137626|4|1|Delivery = 1 week delivery after design is completed|Y
01|137628|4|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|137628|4|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|137628|4|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|137628|4|4|TRAVEL.|Y
01|137628|4|5|INSTALL INCLUDES INSTALLING TRUNNION|Y
01|137628|5|1|TRUNNION ASSEMBLY|Y
01|137628|5|2|ASSEMBLY INCLUDES:|Y
01|137628|5|3|TRUNNION (2) JERGENS 5RA200ZPS K20 ZPS|Y
01|137628|5|4|MOUNTED TO TRUNION AND 4TH AXIS ASSEMBLY ROTARY|Y
01|137628|5|5|UNION|Y
01|137630|2|1|TRUNK STOCK ITEM - DO NOT SHIP|Y
01|137630|3|1|TRUNK STOCK ITEM - DO NOT SHIP|Y
01|137630|4|1|TRUNK STOCK ITEM - DO NOT SHIP|Y
01|137631|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|137634|1|1|ISO 30 ER32|Y
01|137634|3|1|ISO 30 ER11|Y
01|137634|5|1|ISO 30 ER20|Y
01|137652|1|1|SF-PACKAGE-HSK63A-EXT-CP consists of Shrink Fit Machine|Y
01|137652|1|2|Accessories and 10 HSK63A Shrink Fit Holders with|Y
01|137652|1|3|pluggable coolant ports.|Y
01|137652|2|1|START2 PACKAGE DISCOUNT FOR COOLANT TUBES|Y
01|137693|1|1|5 Stk 9 ETA 3-5 daysbalance pending|Y
01|137693|2|1|In stock alternative to abovegauge length is 3.54|Y
01|137699|1|1|Tool Certificate #13680-2616-032320|Y
01|137709|1|1|BMT65 Adjustable Live Tool for a Haas DS30Y Lathe.|Y
01|137711|1|1|Special Matching pricing of CNC180-2W-250OSP4-M|Y
01|137711|1|2|Due to delivery requirments|Y
01|137711|2|1|16C dead lenght collet closer and adpater plate.|Y
01|137711|4|1|Sub Plate is required to match the table center height|Y
01|137711|4|2|Sub Plate not included.|Y
01|137716|1|1|Tooling Certificate Number: 20275-2634-041620|Y
01|137719|2|1|Installation includes Cable set|Y
01|137719|3|1|Free with Table Promo!|Y
01|137719|4|1|Free with Table Promo!|Y
01|137732|3|1|Special 4+1 Rotary Union|Y
01|137732|3|2|** 3000 psi handling **|Y
01|137732|5|1|Installation includes: drive unit short bar fiber|Y
01|137732|5|2|optic cables communication cables bulk head cable|Y
01|137732|5|3|set external cable set parameter changes service|Y
01|137732|5|4|time and travel|Y
01|137738|1|1|Reference RGA#TAR-55634|Y
01|137738|1|2|Quote for inspection fee and PM for customer's|Y
01|137738|1|3|5AX-130 s/n: 4999|Y
01|137740|3|1|Old part# BT40-WE3/4-65|Y
01|137740|4|1|Old part# NBT40-FMC38.1-60|Y
01|137768|25|1|Extra 20% Discount applied per Summer Promo|Y
01|137773|3|1|C5007-0750-6.00 75TG Collet Chuck With 6.0 G/L|Y
01|137793|5|1|BT40-C32-90|Y
01|137801|1|1|Special net pricing|Y
01|137806|1|1|Tool Cert #7585-2651-051320|Y
01|137806|3|1|Item is considered non standard special and will not|Y
01|137806|3|2|be cancelable nor returnable once ordered|Y
01|137807|3|1|C5007-0750-6.00 75TG Collet Chuck With 6.0 G/L|Y
01|137810|3|1|Special 4+1 Rotary Union|Y
01|137810|3|2|** 3000 psi handling **|Y
01|137810|5|1|Installation includes: drive unit short bar fiber|Y
01|137810|5|2|optic cables communication cables bulk head cable|Y
01|137810|5|3|set external cable set parameter changes service|Y
01|137810|5|4|time and travel|Y
01|137823|1|1|Non-returnablenon-cancelable|Y
01|137827|4|1|*New CP Spec - Pluggable Coolant Ports|Y
01|137827|7|1|*New CP Spec - Pluggable Coolant Ports|Y
01|137827|10|1|*New CP Spec - Pluggable Coolant Ports|Y
01|137827|11|1|*New CP Spec - Pluggable Coolant Ports|Y
01|137841|1|1|Reference RGA# QUA-55574|Y
01|137841|1|2|Repair of MNZ20-SK16X-ICE-12K s/n: 19902304 10|Y
01|137841|1|3|(Mimatic# 193568)|Y
01|137841|2|1|housing must be replaced.|Y
01|137849|1|1|Rotary Joint TCD-37501|Y
01|137849|1|2|Quoted as net pricing. Non Cancellable Non Returnable|Y
01|137895|10|1|C5007-0750-6.00 75TG Collet Chuck With 6.0 G/L|Y
01|137895|11|1|Can be used on 75TG Chucks.|Y
01|137896|4|1|Installation includes: Drive unit short bar fiber|Y
01|137896|4|2|optic cable communications cables bulkhead cables|Y
01|137896|4|3|external cables parameter changes service time and|Y
01|137896|4|4|travel.|Y
01|137908|1|1|Reference RGA# LVR-55589|Y
01|137908|1|2|Repair of MNL12-ER32Z-MS s/n: A1450 (Alps# T32216)|Y
01|137908|2|1|Bearings O-rings Collet nuts and spindles to be|Y
01|137908|2|2|replaced. ***We will try to clean up the original|Y
01|137908|2|3|spindle and re-use;however we will not be able to tell|Y
01|137908|2|4|if it will re-usable until assembled and test run.If we|Y
01|137908|2|5|are able to re-use the price will be $1606.80|Y
01|137927|1|1|Substitute to discontinued W10R5-0562-3.74|Y
01|137943|4|1|Must use the TWQW-025 handle with this TQW-PS(13)|Y
01|137944|1|1|HSK125A Test Bar- 2.0 X 10.0 Gage|Y
01|137944|1|2|Part Number TBD|Y
01|137944|1|3|Quoted at NET price.|Y
01|137952|1|1|7/8 PART # 500-056 ETA Mid-July|Y
01|137991|2|1|NBT40-SF12-90CP (Dual Contact)|Y
01|137995|4|1|3000psi hydraulic power unit with one rotary table|Y
01|137995|4|2|brake circuit and one fixture clamp circuit|Y
01|137995|6|1|Installation includes: Drive unit short bar fiber|Y
01|137995|6|2|optic cables communications cables bulkhead cables|Y
01|137995|6|3|external cables parameter changes service time and|Y
01|137995|6|4|travel.|Y
01|138010|2|1|Includes adapter plate|Y
01|138010|3|1|Includes riser plate|Y
01|138010|5|1|Installation includes: Drive unit short bar fiber|Y
01|138010|5|2|optic cable communications cable bulkhead cables|Y
01|138010|5|3|parameter changes service time and travel.|Y
01|138017|1|1|DRAW TYPE - TIGHTENS FROM BACK|Y
01|138017|2|1|TIGHTENS FROM SIDE|Y
01|138025|2|1|MOQ = 3 pcs|Y
01|138029|10|1|***MZQT5-ER40Z-MS-OFF?***|Y
01|138045|1|1|Tooling Certificate Number: 20275-2634-041620|Y
01|138047|1|1|Reference RGA# LVR-55515|Y
01|138047|1|2|Repair of MNL12-ER32X-C-7MP s/n: 2625306|Y
01|138047|1|3|(Mimatic# 100876)|Y
01|138047|2|1|Bearings seals o-rings and damaged ER spindle to be|Y
01|138047|2|2|replaced.|Y
01|138066|1|1|Reference RGA# QUA-55531|Y
01|138066|1|2|Repair of MNZ20-SK16Z-12K s/n: 19903686 14|Y
01|138066|1|3|(Mimatic# 193569)|Y
01|138066|2|1|This is for new housing. All other parts are covered|Y
01|138066|2|2|under warranty.|Y
01|138073|1|1|2 IN STOCK|Y
01|138073|8|1|REQUIRES 10MM RISER FOR 240MM CENTER HEIGHT|Y
01|138073|8|2|REQUIRED LEAD TIME IS FOR THE RISER TO BE|Y
01|138073|8|3|MANUFACTURED.  PRICE OF RISER IS INCLUDED.|Y
01|138073|9|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|138073|9|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|138073|9|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|138073|9|4|TRAVEL.|Y
01|138074|1|1|4 IN STOCK|Y
01|138074|7|1|REQUIRES 20MM RISER FOR 300MM CENTER HEIGHT|Y
01|138074|7|2|REQUIRED LEAD TIME IS FOR THE RISER TO BE|Y
01|138074|7|3|MANUFACTURED.  PRICE OF RISER IS INCLUDED.|Y
01|138074|9|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|138074|9|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|138074|9|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|138074|9|4|TRAVEL.|Y
01|138079|1|1|Tooling Certificate #25000-2585-022420RT|Y
01|138079|1|2|Tooling Certificate #25000-2586-022420RT|Y
01|138082|2|1|NET Price|Y
01|138083|2|1|NET Price|Y
01|138088|6|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|138088|8|1|FULL 4TH AXIS INSTALLATION/INTERFACE IF LYNDEX NIKKEN|Y
01|138088|8|2|PROVIDES. NO WORKHOLDING INCLUDED|Y
01|138088|10|1|STANDARD CERFTIFICATE OFFERED WITH AS STANDARD AZIMUTH|Y
01|138088|10|2|PURCHASE WITH 4TH AXIS|Y
01|138089|3|1|Need customer specifications|Y
01|138102|2|1|Non Returnable.|Y
01|138117|1|1|X axis - offset from centerline of turret to Main|Y
01|138117|2|1|X axis offset from center to sub|Y
01|138117|3|1|X axis runs straight centerline of turret|Y
01|138117|4|1|Z axis Main Spindle|Y
01|138117|5|1|Z axis Main & Sub Dual Output|Y
01|138117|6|1|Z axis - Main & Sub - Offset from Sub more clearance|Y
01|138127|1|1|BMT65-CO02mmx for haas ST|Y
01|138138|2|1|Includes Fanuc drive unit external cables interface|Y
01|138138|2|2|cables short bar fiber optic cable communications|Y
01|138138|2|3|cable travel labor expenses|Y
01|138164|6|1|TOTAL COST FOR LYNDEX NIKKEN TO MAKE POSITIONING BLOCK|Y
01|138164|6|2|FOR AMERICAN ROLLER BEARINGS.|Y
01|138176|3|1|Need customer specifications|Y
01|138187|1|1|9-ZMAC20-40V|Y
01|138202|1|1|Eval for 5AX-130 SN: 4999 RGA # TAR-55634|Y
01|138202|1|2|Technician could move tilt axis 3 microns when brake on|Y
01|138202|1|3|Found that bolts holding worm wheel to body were loose|Y
01|138202|1|4|Re-tighened to correct specification of 43.1Nm.|Y
01|138202|1|5|Adjusted backlash Oil Change Test Run|Y
01|138204|1|1|Reference RGA# QUA-55437|Y
01|138204|1|2|Repair of MNL12-SK20X-ICE-10K s/n: 18900510 04|Y
01|138204|1|3|(Mimatic# 184649)|Y
01|138204|2|1|Bearings seals and o-rings to be replaced.|Y
01|138204|2|2|Chrome/Grind Spindle.|Y
01|138221|3|1|Holder for saw arbor|Y
01|138227|1|1|** (2) $48500 List price tooling certificates **|Y
01|138231|1|1|TAR-55638|Y
01|138231|1|2|A21-CTRL-750W-R|Y
01|138231|1|3|SN: D0049C45555044|Y
01|138231|1|4|Customer getting 4001 Alarm - Super Ram Clear Reset|Y
01|138231|1|5|Test ran with Motor/cables here at Lyndex - All OK|Y
01|138243|2|1|Taper of your choice may be requested|Y
01|138258|2|1|For Materials: Cast Iron Aluminum|Y
01|138258|2|2|Special stock not returnable or cancelable|Y
01|138258|3|1|For Materials: Mild Steel Stainless Steel Die Steel|Y
01|138258|3|2|Special stock not returnable or cancelable|Y
01|138273|2|1|ROD800 Hedenhain Scale with mounting kit.|Y
01|138273|3|1|Power and feedback cable set.|Y
01|138302|1|1|Back to WH1 after INS.|Y
01|138302|2|1|Back to WH1 after INS.|Y
01|138305|8|1|In stock substitute to discontinued C5021-1250-6.00|Y
01|138306|8|1|In stock substitute to disocntinued C5021-1250-6.00|Y
01|138307|1|1|Reference RGA# QUA-55339|Y
01|138307|1|2|Repair of MNZ20-SK16Z-12K s/n: 19904122 08|Y
01|138307|1|3|(Mimatic# 196235)|Y
01|138307|2|1|All repair parts are covered under warranty EXCEPT|Y
01|138307|2|2|damaged housing and input spindle.|Y
01|138307|2|3|This charge is for damaged housing and input spindle.|Y
01|138339|1|1|Back to WH1 after INS.|Y
01|138339|2|1|Back to WH1 after INS.|Y
01|138339|3|1|Back to WH1 after INS.|Y
01|138339|4|1|Back to WH1 after INS.|Y
01|138339|5|1|Back to WH1 after INS.|Y
01|138339|6|1|Back to WH1 after INS.|Y
01|138339|7|1|Back to WH1 after INS.|Y
01|138339|8|1|Back to WH1 after INS.|Y
01|138339|9|1|Back to WH1 after INS.|Y
01|138339|10|1|Back to WH1 after INS.|Y
01|138339|11|1|Back to WH1 after INS.|Y
01|138339|12|1|Back to WH1 after INS.|Y
01|138339|13|1|Back to WH1 after INS.|Y
01|138339|14|1|Back to WH1 after INS.|Y
01|138339|15|1|Back to WH1 after INS.|Y
01|138339|16|1|Back to WH1 after INS.|Y
01|138339|17|1|Back to WH1 after INS.|Y
01|138339|18|1|Back to WH1 after INS.|Y
01|138339|19|1|Back to WH1 after INS.|Y
01|138339|20|1|Back to WH1 after INS.|Y
01|138339|21|1|Back to WH1 after INS.|Y
01|138361|7|1|Please Note: Once we receive the purchase order the|Y
01|138361|7|2|draw screw cannot be cancelled or returned.|Y
01|138374|1|1|Reference RGA# LVR-55555|Y
01|138374|1|2|Repair of BMT65-ER32Z-MS  s/n: 19908160 01|Y
01|138374|1|3|(Mimatic# 186493)|Y
01|138374|2|1|Bearings seals o-rings and input spindle to be|Y
01|138374|2|2|replaced|Y
01|138374|4|1|Repair of BMT65-ER32X s/n: 19907578 07|Y
01|138374|4|2|(Mimatic# 186489)|Y
01|138374|5|1|Bearings seals o-rings and ER32 spindle to be|Y
01|138374|5|2|replaced.|Y
01|138383|1|1|With PS-868 installed at the factory|Y
01|138383|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|138383|2|1|With PS-868 installed at the factory|Y
01|138383|2|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|138383|3|1|With PS-868 installed at the factory|Y
01|138383|3|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|138383|4|1|Installed on the above 3 holders at the factory|Y
01|138383|4|2|Cost built into the holders above|Y
01|138388|1|1|Reference RGA# CUR-55578|Y
01|138388|1|2|Repair of MRAM-ER20L s/n: 4460602 (Mimatic# 162708)|Y
01|138388|2|1|Bearings seals and o-rings to be replaced.|Y
01|138390|1|1|1st Batch|Y
01|138390|2|1|1st Batch|Y
01|138390|3|1|1st Batch|Y
01|138390|4|1|1st Batch|Y
01|138390|5|1|1st Batch|Y
01|138390|6|1|1st Batch|Y
01|138408|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|138408|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|138411|1|1|Final part number C4006-1250-4.00DIN-M|Y
01|138412|1|1|Nikken PS-N63AE installed at factory|Y
01|138412|2|1|Installed on NC5-63-SK6C-150 at factory|Y
01|138412|4|1|wrench for NC5-63-SK6C-150|Y
01|138412|6|1|wrench for hi-speed/ smooth nut|Y
01|138412|8|1|Nikken PS-N63AE installed at factory|Y
01|138412|9|1|Installed on NC5-63-C32-90 at factory|Y
01|138416|1|1|HSK63A(80)-3/4-110|Y
01|138416|1|2|PART NUMBER IS AN ASSUMPTION|Y
01|138416|1|3|CUSTOMER IS REQUESTING PRICE ON HSK63A 3/4 MILLING|Y
01|138416|1|4|CHUCK WITH AN 80MM FLANGE.|Y
01|138416|2|1|HSK63A(80)-SK16C-120P|Y
01|138416|2|2|PART NUMBER IS AN ASSUMPTION|Y
01|138416|2|3|CUSTOMER IS REQUESTING PRICE ON HSK63A SK16 WITH|Y
01|138416|2|4|80MM FLANGE.|Y
01|138418|1|1|Reference RGA# LVR-55656|Y
01|138418|1|2|Repair of H100A-MRAM s/n: 64879 03 (Mimatic# 162738)|Y
01|138418|2|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|138418|2|2|spindle as needed.|Y
01|138418|4|1|Repair of MRAM-NSK-M17 s/n: 94796 02 (Mimatic# 162756)|Y
01|138418|5|1|Bearings to be replaced|Y
01|138441|1|1|Special prices demo table.|Y
01|138449|2|1|BT50-C20-220|Y
01|138449|2|2|Nikken BT50 20mm Milling Chuck w/ 220mm gl|Y
01|138457|1|1|Tooling Certificate Number: 5410-2377-072219|Y
01|138468|1|1|Includes Induction Rings Cooling Brackets Storage|Y
01|138468|1|2|Racks and (2) Chuck Holders of choice.|Y
01|138482|3|1|Power and Feed back Cables ea axis|Y
01|138482|4|1|Interface w/ drives will need to be installed by HFO|Y
01|138482|4|2|Lyndex Nikken install includes parameters setting up|Y
01|138482|4|3|gridshifts installing Hyd Brake|Y
01|138486|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ON OKUMA|Y
01|138489|1|1|All sales are final on this discontinued item.|Y
01|138544|1|1|TRIDENT SE TO PROVIDE A AND B AXIS MOTORS|Y
01|138544|1|2|HAAS PN: 62-10023 x2|Y
01|138544|2|1|POWER AND FEED BACK CABLE SET EA AXIS.|Y
01|138545|8|1|*** CABLE LENGTH TO BE SPECIFIED AT ORDER ACCEPTANCE!!!|Y
01|138550|1|1|***Part#MZQT5-ER40Z-MS-OFF?***|Y
01|138554|1|1|with 200mm Faceplate.|Y
01|138577|1|1|BT-IN>WH1 IT0643 AIR|Y
01|138577|2|1|BT-IN>WH1 IT0643 AIR|Y
01|138577|3|1|BT-IN>WH1 IT0643 AIR|Y
01|138577|4|1|BT-IN>WH1 IT0643 AIR|Y
01|138578|1|1|1st Batch|Y
01|138578|2|1|1st Batch|Y
01|138579|1|1|Reference RGA# TOR-55629|Y
01|138579|1|2|Repair of HP-150|Y
01|138579|5|1|Calibration Service included.|Y
01|138580|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|138580|4|2|External Cables Service Time & Travel.|Y
01|138586|1|1|1st Batch|Y
01|138586|2|1|1st Batch|Y
01|138594|4|1|Includes Rotary Scale Mount Kit & Wiring.|Y
01|138594|4|2|(+/- 5 Arc Seconds)|Y
01|138608|1|1|BT50-FMH22-47-150|Y
01|138608|1|2|BT50 FMH Face Mill Arbor|Y
01|138608|1|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|138608|1|4|1 PC ETA 2 WKS|Y
01|138610|3|1|HFO TO SUPPLY SERVO MOTORS AND CABLES LYNDEX NIKKEN TO|Y
01|138610|3|2|INSTALL|Y
01|138610|5|1|COLLET CHUCK PROMO KIT|Y
01|138610|5|2|NO CHARGE|Y
01|138617|1|1|TC#25000-2555-020320RT|Y
01|138617|1|2|TC#25000-2556-020320RT|Y
01|138630|1|1|P/N: SK20-5A|Y
01|138630|2|1|P/N: SK20-6A|Y
01|138631|1|1|Reference RGA# LVR-55380|Y
01|138631|1|2|Repair of 1 x OKLB35-ER50Z s/n: n/a|Y
01|138631|1|3|(Alps# 57-250-002)|Y
01|138631|2|1|Bearings o-rings collet nut and clutch to be replaced|Y
01|138641|3|1|Installation includes: Drive unit short bar fiber|Y
01|138641|3|2|optic cable communications cable bulkhead cables|Y
01|138641|3|3|external cables parameter changes service time and|Y
01|138641|3|4|travel.|Y
01|138642|2|1|***NET PRICE***|Y
01|138642|2|2|***SA3080-ER32Z-RH-OFF***|Y
01|138656|2|1|Wrench for above HSK63A-SK16C-120P|Y
01|138656|5|1|Wrench for standard SK16 holders.|Y
01|138657|1|1|We would modify our Standard part # CAT40-C1-85U-IDU|Y
01|138657|1|2|to add DIN. Once this holder is modified it is not|Y
01|138657|1|3|returnable.|Y
01|138657|1|4|Net price has been quoted no further discount should be|Y
01|138657|1|5|Taken|Y
01|138658|1|1|Repair of CNCZ180LYA SN: 12184|Y
01|138658|1|2|Bearings/Seals/Brake Parts need replace|Y
01|138658|1|3|TAR-55708|Y
01|138658|24|1|Repair of TAT-105 SN 20929-B|Y
01|138658|24|2|Bearings/Seals/Brake parts need replace|Y
01|138662|1|1|figure 2|Y
01|138662|1|2|Pull Stud Draw Bolt|Y
01|138662|2|1|Pull Stud for 105mm gl holder|Y
01|138662|4|1|part# BT50-MTB5-120|Y
01|138662|4|2|Figure 2    - 120mm gl|Y
01|138662|4|3|Pull Stud Draw Bolt|Y
01|138662|5|1|Pull Stud for 120mm gl holder*|Y
01|138662|7|1|part# BT50-MTB5-150|Y
01|138662|7|2|Figure 2    - 150mm gl|Y
01|138662|7|3|Pull Stud Draw Bolt|Y
01|138662|8|1|part# PS-543|Y
01|138662|8|2|Pull Stud for 150mm gl holder*|Y
01|138673|4|1|3pcs Stock @ USA @ Factoy bal = pending|Y
01|138689|2|1|Includes Installation Drive Unit Fibre Optics|Y
01|138689|2|2|Service Time & Travel.|Y
01|138689|3|1|1 full set of cables.|Y
01|138693|1|1|Tooling Certificate Number: 13485-2647-051120|Y
01|138698|1|1|TAR-55720|Y
01|138698|1|2|Repair quote of CNCZ250FA SN: NA|Y
01|138698|1|3|Table is high speed needs ww/ws/bearings/seals/brake|Y
01|138720|15|1|Part #TCE-95947-XXXXR|Y
01|138720|15|2|Length TBD depending on application|Y
01|138720|16|1|Part # TCE-95951-XXXXR|Y
01|138720|16|2|Length TBD depending on application|Y
01|138737|1|1|P/N: SK20-5A|Y
01|138737|2|1|P/N: SK20-6A|Y
01|138738|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|138772|4|1|Mach:** Confirm Cust. Has Balance Mach. **|Y
01|138775|1|1|1st Batch|Y
01|138775|2|1|1st Batch|Y
01|138775|3|1|1st Batch|Y
01|138782|2|1|Includes Installation Drive Unit Fibre Optics|Y
01|138782|2|2|Service Time & Travel.|Y
01|138782|3|1|1 full set of cables.|Y
01|138807|1|1|HSK63A/80-SK16-90P-IDUC|Y
01|138807|1|2|PART NUMBER IS AN ASSUMPTION|Y
01|138807|1|3|CUSTOMER IS REQUESTING PRICE AND DELIVERY ON HIGH|Y
01|138807|1|4|SPEED SK16 HOLDER. BALANCED TO 30000 RPM|Y
01|138807|1|5|HOLDER NEEDS 80MM FLANGE|Y
01|138807|2|1|HSK63A/80-SK16-90P-IDUC|Y
01|138807|2|2|PART NUMBER IS AN ASSUMPTION.|Y
01|138807|2|3|CUSTOMER IS REQUESTING PRICE ON HIGH SPEED SK16|Y
01|138807|2|4|BALANCED TO 30000 RPM. WITH 80MM FLANGE.|Y
01|138819|1|1|High Speed left hand 200MM table with face plate.|Y
01|138819|1|2|Without motor.|Y
01|138825|1|1|1st Batch|Y
01|138853|1|1|Req. INS/New Design|Y
01|138853|2|1|Req. INS/New Design|Y
01|138862|1|1|MOD/Install Accessories:A5/8-18 & 1-1/4-KEYSET|Y
01|138881|1|1|Reference RGA# LVR-55495|Y
01|138881|1|2|Repair of MZMP46-ER32Z-ICE s/n: 74676 16|Y
01|138881|1|3|(Mimatic# 124854)|Y
01|138881|2|1|Bearings seals and o-rings to be replaced.|Y
01|138895|1|1|Reference RGA# LVR-55640|Y
01|138895|1|2|Repair of BMT45-ER25Z-ICE s/n: 19903444 03|Y
01|138895|1|3|(Mimatic# 192509)|Y
01|138895|2|1|Bearings seals and o-rings to be replaced.|Y
01|138897|1|1|Tooling Certificate Number:|Y
01|138897|1|2|13712-2702-070720|Y
01|138938|3|1|MAX DIA 1/8|Y
01|138941|1|1|with J-Nut: SKN-20BJ|Y
01|138951|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|138960|1|1|MZQT47-ER25X-MD  Mazak Live X-axis Ver Str ER25|Y
01|138960|1|2|MainDual(MD) <V-Type> Mimatic #169636|Y
01|138963|1|1|Installed with PS-123E at the factory|Y
01|138963|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|138963|2|1|Installed on S-NC5-46-FMA31.75CS-45-M at the factory|Y
01|138976|9|1|***Used Stock prime condition for re-sell +10% discount|Y
01|138976|9|2|covered under standard warranty***|Y
01|138990|1|1|PRESETTER WITH CAT50 SPINDLE ATTACHED|Y
01|138990|2|1|CAT40 SPINDLE FOR E460 PRESETTER|Y
01|138990|4|1|CAT40 MASTER GAUGE|Y
01|138990|5|1|CAT50 MASTER GAUGE|Y
01|138990|6|1|LABEL PRINTER FOR E460N|Y
01|138990|7|1|PAPER ROLL FOR PRINTER|Y
01|138992|1|1|HATHOR SIX A PRESETTER WITH CAT50 SPINDLE|Y
01|138992|2|1|CAT40 SPINDLE FOR HATHOR SIX A|Y
01|138992|3|1|MASTER GAUGE FOR CAT40|Y
01|138992|4|1|MASTER GAUGE FOR CAT50|Y
01|138994|1|1|13pcs Stock remainder eta aprox 1-2 weeks.|Y
01|138997|1|1|MZQT47-ER25X-MD  Mazak Live X-axis Ver Str ER25|Y
01|138997|1|2|MainDual(MD) <V-Type> Mimatic #169636|Y
01|138997|3|1|Mazak Live X-axis Ver Str ER25 MainDual(MD)|Y
01|138997|3|2|<V-Type> - INT/ EXT COOLANT>>Mimatice #171059|Y
01|138997|5|1|Mazak Live Z-axis Ver 90DEG ER25 MainSUBDual(MSD)|Y
01|138997|5|2|<H-Type> Ref drwg # 00057382>>Mimatic #196943|Y
01|139010|2|1|***Gauge Length 2.50***|Y
01|139010|4|1|***Gauge Length 2.00***|Y
01|139011|1|1|x7 pcs ETA 1-2 weeks|Y
01|139012|1|1|HSK80F Taper 22mm pilot shell mill standard gage|Y
01|139012|4|1|HSK80F 5/16 Shrink Fit standard gage|Y
01|139012|13|1|HSK80F ER40 long length|Y
01|139012|15|1|HSK80F Taper ER32 long gage|Y
01|139012|17|1|HSK80F ER20 long gage length|Y
01|139015|1|1|1st Batch|Y
01|139024|1|1|IT50-FMA47.625-75   IT50 Face Mill Arbor|Y
01|139039|1|1|Reference RGA# TOR-55668|Y
01|139039|1|2|Repair of PF-2|Y
01|139039|4|1|Calibration service is included.|Y
01|139052|1|1|5AX-4MT SN 2057 Tilt Axis Cable Set Extra Long|Y
01|139052|1|2|Mori NV5000 SN 0318|Y
01|139055|1|1|#12 Dust Proofers for H022M12 Howa Chuck set of 3pcs|Y
01|139063|2|1|CAT40 SPINDLE FOR HATHOR SIX A|Y
01|139063|3|1|MASTER GAUGE FOR CAT40|Y
01|139063|4|1|MASTER GAUGE FOR CAT50|Y
01|139065|1|1|Reference RGA# CUR-55726|Y
01|139065|1|2|Repair of CAT40U-NX5-150 s/n: Mbzb-052|Y
01|139094|1|1|Without Heindenhain Motor or Cable Set.|Y
01|139094|2|1|Heidenhain Scale and Mounting Kit|Y
01|139096|1|1|Reference RGA# LVR-55711|Y
01|139096|1|2|Repair of MZMP47-ER32Z s/n: 576302|Y
01|139096|1|3|(Mimatic# 124619)|Y
01|139096|2|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|139096|2|2|spindles as needed.|Y
01|139097|1|1|Replacement table only for R450X1|Y
01|139105|4|1|*new style- customer can plug the coolant ports as|Y
01|139105|4|2|option. It will come with the sets screws to do so.|Y
01|139108|1|1|Reference RGA# TOR-55733|Y
01|139108|1|2|Repair of 2 x CAT40-NPU8-110U-IDU|Y
01|139108|2|1|For both holders|Y
01|139114|1|1|Tariff Code: 8466.10.0175|Y
01|139114|2|1|Tariff Code: 8466.10.0175|Y
01|139116|4|1|Includes Rotary Scale Mount Kit & Wiring.|Y
01|139116|4|2|(+/- 5 Arc Seconds)|Y
01|139154|2|1|K|N
01|139165|1|1|Reference RGA# LVR-55591|Y
01|139165|1|2|Repair of MNL12-ER25Z-MSD s/n: A0066|Y
01|139165|1|3|(Alps# MSA01-6L000)|Y
01|139165|2|1|Bearings o-rings collet nuts gears and spindles to|Y
01|139165|2|2|be replaced. ***We will try to clean up the original|Y
01|139165|2|3|spindles and re-use; however we will not be able to|Y
01|139165|2|4|tell if it will be re-usable until assembled and test|Y
01|139165|2|5|run. If we are able to re-use the price will be|Y
01|139165|2|6|$3076.00|Y
01|139184|1|1|Promo NET price for HOT DEALS items on website|Y
01|139189|1|1|Reference RGA# LVR-55715|Y
01|139189|1|2|Repair of OKL3-ER32Z-OFMS s/n: AL0200|Y
01|139189|1|3|(Alps# OK109-15001)|Y
01|139189|2|1|Bearings o-rings collet nuts and spindle shaft to be|Y
01|139189|2|2|replaced.|Y
01|139198|1|1|TAR-55684 CNC180ZA SN: 20725T|Y
01|139198|1|2|Table has casting damage not repairable|Y
01|139198|4|1|TAR-55684 CNC180ZA SN: 20694T|Y
01|139198|4|2|Table has heavy damage.|Y
01|139198|4|3|Needs new worm screw/wheel/bearings/seals and spindle|Y
01|139204|1|1|Reference RGA# LVR-55520|Y
01|139204|1|2|Repair of MNL12-ER32Z s/n: A3681 (Alps# T32207)|Y
01|139204|2|1|Bearings o-rings collet nut and spindle to be|Y
01|139204|2|2|replaced. *** We will try to clean up the original|Y
01|139204|2|3|spindle; however we will not be able to tell if it|Y
01|139204|2|4|will be re-usable until assembled and test run. If we|Y
01|139204|2|5|are able to re-use the price will be $1431.60|Y
01|139215|2|1|*new style - with coolant ports|Y
01|139222|10|1|Substitute balanceable version is no longer available|Y
01|139223|1|1|1pc in stock|Y
01|139223|1|2|2pc lead time 1.5 weeks|Y
01|139234|1|1|TC#1735-2678-060520Open balance = $233.85 list price|Y
01|139234|1|2|TC#1735-2705-070820Open balance = $4114.75 list price|Y
01|139249|2|1|KOSTER TO PROVIDE TO LYNDEX NIKKEN SERVO MOTOR|Y
01|139249|2|2|INNER CABLE HARNESS. KOSTER TO HAVE LOCAL SERVICE TO|Y
01|139249|2|3|INSTALL. ALL HARWARE CABLE TO BE PURCHASED FROM FADAL|Y
01|139249|2|4|NEW TABLE WITH SERVO MOTOR AND EXTERNAL CABLES|Y
01|139249|2|5|$15950.00 LIST W/O INSTALL|Y
01|139249|2|7|THIS TABLE IS A DEMO TABLW LIKE NEW WITH MINOR SCRATCHE|Y
01|139249|2|8|NEW TABLE  WARRANTTEE INCLUDED|Y
01|139250|4|1|Includes Rotary Scale Mount Kit & Wiring.|Y
01|139250|4|2|(+/- 5 Arc Seconds)|Y
01|139253|4|1|Includes Rotary Scale Mount Kit & Wiring.|Y
01|139253|4|2|(+/- 5 Arc Seconds)|Y
01|139273|1|1|Extra feature offereed (balanceable)Non-returnable|Y
01|139273|1|2|Non-cancelable|Y
01|139284|1|1|This item is considered special once an order is|Y
01|139284|1|2|placed it cannot be cancelled or returned.|Y
01|139292|1|1|TAR-55724|Y
01|139292|1|2|5AX-2MT-105-120FA-M SN: 8088|Y
01|139292|1|3|Customer having indexing issue on Tilt Axis|Y
01|139292|1|4|Tilt axis needs to be repaired seems like table took|Y
01|139292|1|5|contact at some point damaging worm wheel/screw and|Y
01|139292|1|6|bearings and seals.|Y
01|139320|3|1|Mazak Live Z-axis Hor 90deg MI63 EXT Coolant <H-Type>|Y
01|139320|3|2|Main Sub offset tool|Y
01|139326|3|1|MZQT47-MI50Z-SUB-OFF-ICE|Y
01|139326|3|2|Mazak Live Tool Z-Axis 90degree (H-Type) OFFSET SUB|Y
01|139326|3|3|Internal Coolant  OR ICE = internal/external Coolant|Y
01|139326|3|4|ICE can also be run dry.|Y
01|139326|7|1|MZQT47-MI50Z-MS-OFF-C OR MZQT47-MI50Z-MS-OFF-ICE|Y
01|139326|7|2|Mazak Live Tool Z-Axis 90degree (H-Type) OFFSET MainSub|Y
01|139326|7|3|Internal Coolant OR ICE = internal/external Coolant|Y
01|139326|7|4|ICE can alo be run dry.|Y
01|139337|5|1|Adapter(Tool Body)|Y
01|139337|6|1|Adapter(Tool Body)|Y
01|139337|10|1|Adapter(Tool Body)|Y
01|139337|11|1|Adapter(Tool Body)|Y
01|139355|3|1|Replaces NIK-IW0126-900S|Y
01|139355|5|1|Replaces NIK-IW0126-1100K|Y
01|139355|6|1|Replaces NIK-IW0126-700S|Y
01|139363|1|1|This line quoted as net no additional discounts|Y
01|139364|1|1|This line quoted as net no additional discounts|Y
01|139377|2|1|C40RAM-ER32-180IC-65TP / Mimatic #178108|Y
01|139377|7|1|For Haas VF11|Y
01|139377|8|1|For Haas GM-2|Y
01|139378|1|1|1st Batch|Y
01|139378|2|1|1st Batch|Y
01|139407|1|1|part# SSH1-ECH10S-105|Y
01|139407|1|2|Alps straight shank ER16 collet extension|Y
01|139417|3|1|Replaces NIK-IW0126-900S|Y
01|139417|5|1|Replaces NIK-IW0126-1100K|Y
01|139417|6|1|Replaces NIK-IW0126-700S|Y
01|139425|1|1|1st Batch|Y
01|139425|2|1|1st Batch|Y
01|139446|3|1|Expected delivery 8/21/2020|Y
01|139448|1|1|HSK125A-C3/4-115 3/4 Milling Chuck w/ 115mm GL|Y
01|139448|1|2|1 - 9 piece pricing|Y
01|139448|2|1|HSK125A-C3/4-115 3/4 Milling Chuck w/ 115mm GL|Y
01|139448|2|2|10 - 19 piece pricing|Y
01|139448|3|1|HSK125A-C3/4-115 3/4 Milling Chuck w/ 115mm GL|Y
01|139448|3|2|20+ piece pricing|Y
01|139476|1|1|1st Batch|Y
01|139476|2|1|1st Batch|Y
01|139476|3|1|1st Batch|Y
01|139478|1|1|CNC321 SN: 10380|Y
01|139478|1|2|TAR-55764|Y
01|139478|1|3|Table needs full rebuild/overhaul: Bearings/WW/WS|Y
01|139497|1|1|ER11 Straight Shank Holder >> Part # 3184-Y426-0100|Y
01|139504|1|1|Special R/Table CNCZ321MA s/n 9540|Y
01|139504|1|2|without Motor. Special Modification Cost Included.|Y
01|139504|2|1|Direct Cable|Y
01|139506|2|1|6+1 Rotary Joint / Union CNC260|Y
01|139506|3|1|Direct Cable|Y
01|139515|1|1|HW-MJAW-15-2J3J-HS-1.5-SP|Y
01|139515|1|2|Master Jaws (1.5mm) for H023M15 (H023M15 o-4499)|Y
01|139515|1|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|139515|1|4|1 set(=4pcs)|Y
01|139515|2|1|Soft Jaw for H023M15(H023M15 O-4499) Type P=1.5|Y
01|139515|2|2|Quoted as NET pricingnon-returnablenn-cancelable|Y
01|139515|2|3|1 set(=3pcs)|Y
01|139516|2|1|1/2 FREE WITH PURCHASE OF SHRINK FIT MACHINE|Y
01|139516|3|1|2/2 FREE WITH PURCHASE OF SHRINK FIT MACHINE|Y
01|139522|2|1|1/2 FREE WITH PURCHASE OF SHRINK FIT MACHINE|Y
01|139522|3|1|2/2 FREE WITH PURCHASE OF SHRINK FIT MACHINE|Y
01|139567|33|1|OLLET CHUCKS & ACCESSORIES|Y
01|139571|1|1|TAR-55758 CNC401MA-M SN: 9454|Y
01|139571|1|2|Bearings/Seals/O-Rings/Worm Wheel/Screw Need replace|Y
01|139571|1|3|Motor we cannot test but can send out for eval|Y
01|139582|1|1|Core Trade in Pricing for new table|Y
01|139582|1|2|Lyndex-Nikken takes old table as core deposit.|Y
01|139582|1|3|New Casting mount old motor and electronics|Y
01|139586|1|1|This quote is based on a Standard pitch of 55mm.|Y
01|139592|1|1|Reference RGA# LVR-55562|Y
01|139592|1|2|Repair of OK101-79000 s/n: AL0006|Y
01|139592|1|3|(Alps# OK101-79000)|Y
01|139592|2|1|Bearings O-rings clutch nuts and spindle to be|Y
01|139592|2|2|replaced. ***We will try to clean up the original|Y
01|139592|2|3|spindle and re-use; however we will not be able to|Y
01|139592|2|4|tell if it will be re-useable until assembled and test|Y
01|139592|2|5|run. If we are able to re-use the price will be|Y
01|139592|2|6|$2930.80|Y
01|139596|1|1|1st Batch/SP|Y
01|139596|2|1|1st Batch|Y
01|139596|3|1|1st Batch|Y
01|139596|4|1|1st Batch|Y
01|139596|5|1|Req.INS-Correct Item/Etching/Label|Y
01|139596|6|1|1st Batch|Y
01|139596|7|1|1st Batch|Y
01|139596|8|1|1st Batch|Y
01|139596|9|1|1st Batch|Y
01|139596|10|1|1st Batch|Y
01|139596|11|1|1st Batch|Y
01|139596|12|1|1st Batch MOD(1)Install E32-NUT (1)E32-NUT&ER32-SCREW(C|Y
01|139596|13|1|1st Batch|Y
01|139596|14|1|1st Batch|Y
01|139596|15|1|1st Batch|Y
01|139596|16|1|1st Batch|Y
01|139596|17|1|1st Batch|Y
01|139596|18|1|1st Batch|Y
01|139596|19|1|1st Batch|Y
01|139596|20|1|1st Batch|Y
01|139611|1|1|Repair Quote TAR-55658|Y
01|139611|1|2|5AX-201 SN: 5341|Y
01|139611|1|3|Table needs full rebuild - Bearings/Seals/WW/WS Assy.|Y
01|139611|49|1|Freight Charge for pickup and send to L/N from Cust.|Y
01|139612|1|1|900Nm Clamping Torque and Fanuc Motor.|Y
01|139612|2|1|Fanuc Motor.|Y
01|139612|3|1|Includes Rotary Table installation Servo Amp Bulkhead|Y
01|139612|3|2|Cables External Cables Parameter Changes Service|Y
01|139612|3|3|Time and Travel.|Y
01|139619|1|1|1-9 pcs|Y
01|139619|2|1|10-29 pcs|Y
01|139619|3|1|30-49 pcs|Y
01|139619|4|1|50-99 pcs|Y
01|139619|5|1|100+ pcs|Y
01|139620|1|1|CNCB450MA SN: 1351|Y
01|139620|1|2|Table seems to rotate smooth but customer says that|Y
01|139620|1|3|it has some leaks or coolant getting into it.|Y
01|139620|1|4|Re-seal gearbox and covers replace sight glass and|Y
01|139620|1|5|test run|Y
01|139625|6|1|OKL2-SK16X-ICE|Y
01|139625|8|1|OKL2-SK16Z-ICE|Y
01|139631|1|1|Fiture to hold CAT50 Holder on work bench|Y
01|139631|2|1|Torque Wrench Adapter to tighten VC Collet Nut|Y
01|139631|3|1|Torque Wrench|Y
01|139631|4|1|Mazak Pullstud|Y
01|139631|5|1|Torque Wrench adapter to tighten pullstuds|Y
01|139636|1|1|This price includes modifying a standard holder to|Y
01|139636|1|2|include 2hole DIN. Once an order is placed it cannot be|Y
01|139636|1|3|cancelled or returned.|Y
01|139640|1|1|1st Batch|Y
01|139640|2|1|1st Batch|Y
01|139640|3|1|1st Batch|Y
01|139640|4|1|1st Batch|Y
01|139640|5|1|1st Batch|Y
01|139657|1|1|Pneumatic Clamping.|Y
01|139657|2|1|Hydraulic Clamping HYD-UNIT-NACHI Required.|Y
01|139657|6|1|Hydraulic Clamping HYD-UNIT-NACHI Required.|Y
01|139662|1|1|HSK63A 4D x 4 GL Blank Bars|Y
01|139662|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|139662|1|3|3 PC PRICING|Y
01|139662|2|1|HSK63A 4D x 4 GL Blank Bars|Y
01|139662|2|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|139662|2|3|6 PC Pricing|Y
01|139662|3|1|HSK63A 4D x 4 GL Blank Bars|Y
01|139662|3|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|139662|3|3|9 PC Pricing|Y
01|139662|4|1|HSK63A 4D x 4 GL Blank Bars|Y
01|139662|4|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|139662|4|3|12 PC Pricing|Y
01|139662|5|1|HSK63A 4D x 8 GL Blank Bars|Y
01|139662|5|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|139662|5|3|6 PC Pricing|Y
01|139662|6|1|HSK63A 4D x 8 GL Blank Bars|Y
01|139662|6|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|139662|6|3|12 PC Pricing|Y
01|139662|7|1|HSK63A 4D x 8 GL Blank Bars|Y
01|139662|7|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|139662|7|3|18 PC Pricing|Y
01|139662|8|1|HSK63A 4D x 8 GL Blank Bars|Y
01|139662|8|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|139662|8|3|24 PC Pricing|Y
01|139669|1|1|Standard table discount.|Y
01|139671|1|1|1st Batch|Y
01|139671|2|1|INS Req/rework/same lot as #IT0647(Defective ID thread)|Y
01|139681|3|1|Installation includes: Drive unit short bar fiber|Y
01|139681|3|2|optic cable communications cable bulkhead cables|Y
01|139681|3|3|external cables parameter changes service time and|Y
01|139681|3|4|travel.|Y
01|139689|1|1|*External Coolant|Y
01|139689|3|1|cross for MNL0082540|Y
01|139689|4|1|cross for MNL0093175|Y
01|139689|5|1|cross for MNL0072540|Y
01|139697|1|1|TAT-170 s/n: 45853 & 45854|Y
01|139707|14|1|US Metric M6|Y
01|139707|15|1|US Metric M8|Y
01|139707|16|1|US Metric M10|Y
01|139707|17|1|US Metric M12|Y
01|139707|18|1|US Metric M14|Y
01|139707|19|1|US Metric M16|Y
01|139707|20|1|US Metric M18|Y
01|139707|21|1|US Metric M20|Y
01|139707|22|1|US Metric M24|Y
01|139723|1|1|HSK125A-1500A-5.625-IDI >>UNV#274|Y
01|139723|1|2|HSK125A 1.1/2 End Mill Holder Aerospace With ID Chip|Y
01|139723|1|3|Model 1778 installed.|Y
01|139728|1|1|Qty 100-499|Y
01|139731|2|1|Includes Rotary Table installation Servo Amp Bulkhead|Y
01|139731|2|2|Cables External Cables Parameter Changes Service|Y
01|139731|2|3|Time and Travel.|Y
01|139733|2|1|Includes Heidenhain Rotary Scale Mount Kit & Wiring.|Y
01|139733|2|2|(+/- 5 Arc Seconds)|Y
01|139744|6|1|EXTERNAL POWER/FEEDBACK CABLE SET|Y
01|139744|8|1|FULL 4TH AXIS INSTALLATION/INTERFACE IF LYNDEX NIKKEN|Y
01|139744|8|2|PROVIDES. NO WORKHOLDING INCLUDED|Y
01|139744|10|1|STANDARD CERFTIFICATE OFFERED AT NO CHARGE|Y
01|139744|10|2|PURCHASE WITH 4TH AXIS|Y
01|139750|1|1|CNC401TAA21 Trio MFG - Replacement External Cable|Y
01|139750|1|2|2.3M single Cable Power/Feedback/Signal|Y
01|139756|1|1|High Speed Lefty table without face plate or motor.|Y
01|139756|2|1|Includes Heidenhain Rotary Scale Mount Kit & Wiring.|Y
01|139756|2|2|(+/- 5 Arc Seconds)|Y
01|139766|7|1|side lock endmill holder|Y
01|139766|8|1|sidelock endmill holder - taper plus (dual contact)|Y
01|139766|9|1|Taper Plus / Dual Contact|Y
01|139803|1|1|Tooling Certificate Number: 13687-2675-060420|Y
01|139804|1|1|Repeat/Req INS 852071 CPI/Caterpillar *Defect/lastorder|Y
01|139813|1|1|CNCB450MA SN: 1351|Y
01|139813|1|2|Table seems to rotate smooth but customer says that|Y
01|139813|1|3|it has some leaks or coolant getting into it.|Y
01|139813|1|4|Re-seal gearbox and covers replace sight glass and|Y
01|139813|1|5|Test Run.|Y
01|139813|1|6|Test Run showed leaking and chip/coolant contamination|Y
01|139813|1|7|inside table from face seal that was leaking.|Y
01|139816|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|139816|2|2|INCLUDED AT NO COST TO MRT.|Y
01|139818|3|1|Istallation includes optic cables communication cables|Y
01|139818|3|2|parameter changes service time and travel.|Y
01|139818|4|1|1 full set of Cables|Y
01|139820|2|1|installation includes communication cables optic cable|Y
01|139820|2|2|parameter changes service time and travel.|Y
01|139820|3|1|1 full set of external cables|Y
01|139822|3|1|Istallation includes optic cables communication cables|Y
01|139822|3|2|parameter changes service time and travel.|Y
01|139822|4|1|1 full set of Cables|Y
01|139829|6|1|This item is considered special once an order is|Y
01|139829|6|2|placed it cannot be cancelled or returned.|Y
01|139848|1|1|Back spot facing tool|Y
01|139848|1|2|Material - A36 Hold Dia - 1.070|Y
01|139848|1|3|Facing Dia - 2.060 +/- .010 Facing Depth .125|Y
01|139848|1|4|Thickness - 1.00 Space 7|Y
01|139862|2|1|EXTERNAL CABLES INCLUDED|Y
01|139862|2|2|AIR/HYD BOOSTER FOR BRAKE SYSTEM|Y
01|139869|1|1|1st Batch|Y
01|139876|3|1|HSK100A-25-100 HSK100A 25mm End Mill Holder|Y
01|139876|4|1|HSK100A-32-100 HSK100A 32mm End Mill Holder|Y
01|139876|5|1|HSK100A-40-105 HSK100A 40mm End Mill Holder|Y
01|139876|8|1|HSK100A-2000-4.00 HSK100A 2 End Mill Holder|Y
01|139876|8|2|with 4.50 Gage Length|Y
01|139879|1|1|Manufacturing Completion 9/20. This does not include|Y
01|139879|1|2|shipping or inspection time.|Y
01|139883|3|1|Installation includes optic cables communication cable|Y
01|139883|3|2|parameter changes service time and travel.|Y
01|139883|4|1|1 full set of cables.|Y
01|139886|3|1|Installation includes optic cables communication cable|Y
01|139886|3|2|parameter changes service time and trave.|Y
01|139886|4|1|1 full set of Cables|Y
01|139888|1|1|Lyndex-Nikken Tooling Certificate|Y
01|139935|1|1|For E238 s/n: 7205 purchased on 1/15/07|Y
01|139938|1|1|New part number for C5001-1500-2.00|Y
01|139938|2|1|New part number for C5011-0750-4.00|Y
01|139938|17|1|New part number for #C5017-0016-4.12|Y
01|139938|25|1|Extra 5% discount awarded for over 5K list price on|Y
01|139938|25|2|Standard Products|Y
01|139948|1|1|Line 2&3|Y
01|139948|3|1|Line 5|Y
01|139948|4|1|Line 4 wrench|Y
01|139948|6|1|wrench line 6|Y
01|139948|7|1|Line 7|Y
01|139948|8|1|Line 7 wrench|Y
01|139948|10|1|Line 8 wrench|Y
01|139948|11|1|Line 9|Y
01|139948|12|1|Line 9 wrench|Y
01|139948|14|1|Line 11 and 16|Y
01|139948|16|1|Line 13|Y
01|139948|17|1|Line 16|Y
01|139948|18|1|Line 15|Y
01|139948|20|1|Line 17 wrench|Y
01|139948|21|1|Line 18|Y
01|139948|22|1|Line 18 wrench|Y
01|139948|23|1|Line 19|Y
01|139948|24|1|Line 20 & 21|Y
01|139948|26|1|Line 23|Y
01|139948|28|1|Line 25|Y
01|139948|30|1|Line 32|Y
01|139948|31|1|Line 28|Y
01|139948|32|1|Line 33|Y
01|139948|33|1|Line 29|Y
01|139948|34|1|Line 34|Y
01|139948|35|1|Line 30|Y
01|139948|36|1|Line 38|Y
01|139948|38|1|Line 40|Y
01|139955|3|1|Holder for saw arbor|Y
01|139959|2|1|Customer should complete and email the Spindle Info|Y
01|139959|2|2|questionnaire|Y
01|139966|1|1|TAR-55790|Y
01|139966|1|2|5AX-2MT-105-120FA-M SN: 8085|Y
01|139966|1|3|Customer having indexing issue|Y
01|139966|1|4|Table needs complete overhaul rotary and tilt axis|Y
01|139966|1|5|Bearings/Seals/O-Rings/WW/WS and Pancake Cylinder need|Y
01|139966|1|6|replacing|Y
01|139966|1|7|Also casting is damaged threads have been pulled out|Y
01|139966|1|8|of casting.|Y
01|139966|20|1|PART # AX121R101|Y
01|139966|49|1|New replacement covers due to damage|Y
01|139966|49|2|Part #'s:|Y
01|139966|49|3|KB-AX121R102 KB-AX121R104 KB-AX121R105 KB-AX121R111|Y
01|139998|1|1|Pull Stud PS-123E and balancing fee included.|Y
01|140048|1|1|P/N: BMT65-ER25-AD-ICE|Y
01|140048|1|2|BMT65 Live ER25 Adjustable with Internal Coolant|Y
01|140048|1|3|External Coolant and CAN RUN DRY 24/7|Y
01|140049|1|1|13pcs in stock|Y
01|140049|1|2|9pcs ETA 3-4wks|Y
01|140049|1|3|2pcs 12wks mfg + 1-2wks|Y
01|140073|1|1|Reference RGA# TOR-55822|Y
01|140073|1|2|Repair of PRE-PART-05PAN|Y
01|140073|3|1|Calibration service is included.|Y
01|140078|1|1|1st Batch/855452 HABCO|Y
01|140079|5|1|AT40-SF20-80|N
01|140081|2|1|POWER AND FEEDBACK CABLE SET|Y
01|140081|5|1|MISC AIR FITTINGS AIR HOSE AND HARDWARE|Y
01|140089|2|1|Replaced discontinued item C4001-1000-1.75|Y
01|140091|14|1|for C20 MC|Y
01|140118|1|1|ref. drawing 00048663|Y
01|140118|2|1|ref. drawing 00048663|Y
01|140119|1|1|*1pc pricing|Y
01|140119|2|1|*2+pc pricing|Y
01|140138|2|1|High column hydraulic 6+1p rotary joint special work|Y
01|140138|2|2|for Guide key location. Motors not included.|Y
01|140138|2|3|** Delivery is valid for 7 working days then subject|Y
01|140138|2|4|to change.|Y
01|140142|1|1|Part#SST22-ECH010-90|Y
01|140147|1|1|1st Batch(49651-10p/49848-10p)|Y
01|140147|2|1|1st Batch/(1)852792 Bass Tool|Y
01|140147|3|1|1st Batch|Y
01|140147|4|1|1st Batch/(1)854993 Aronson/JCI|Y
01|140151|2|1|This item is discontinued once an order is placed|Y
01|140151|2|2|they cannot be cancelled or returned.|Y
01|140157|3|1|Includes (2)CAT40 Tool Pots|Y
01|140215|3|1|HSK125A-ER40-5.00-ID|Y
01|140215|3|2|HSK125A ER40 HiTorq Bearing Nut Collet Chuck ID chip|Y
01|140215|3|3|hole UNV#504|Y
01|140215|9|1|HSK125A-SK25-127-J-IDI|Y
01|140215|9|2|HSK125A SK25 127mm with chip hole|Y
01|140215|9|3|40 pcs $854|Y
01|140215|9|4|60 pcs $784|Y
01|140215|9|5|80 pcs $748|Y
01|140215|32|1|Price is for 2 or more pieces|Y
01|140218|7|1|NBT30-C25-80 2Lock TaperPlus NBT30 25mm Milling Chuck|Y
01|140218|7|2|Please Note: NBT30-C25-80 is non standard stock. Once|Y
01|140218|7|3|a purchase order is placed it cannot be cancelled|Y
01|140218|7|4|or returned.|Y
01|140223|1|1|1-5pcs pricing with 10-PRJ 2-ports air only!|Y
01|140223|2|1|7 pcs pricing with 10-PRJ 2-ports air only.|Y
01|140223|3|1|Table with special face plate and 6+1PRJ|Y
01|140223|3|2|15% core buy back discount|Y
01|140223|4|1|320MM support table with special face plate 6+1PRJ|Y
01|140223|4|2|and special center height.|Y
01|140223|4|3|15% core buy back discount|Y
01|140223|6|1|CNC321TFA complete rebuild including parts and labour.|Y
01|140223|6|2|Does not include rotary joint.|Y
01|140223|6|3|Price may vary upon inspection.|Y
01|140223|7|1|TAT-321 support table complete rebuild with parts and|Y
01|140223|7|2|labour. Does not include rotary joint.|Y
01|140223|7|3|Price may very upon inspection.|Y
01|140224|1|1|Replacement nut for CAT50-C3/4-105-IDU.|Y
01|140224|1|2|Originally ordered on SO# 824791|Y
01|140234|1|1|Replaces SKN-6WBJ(GH)|Y
01|140239|1|1|Part#SST22-ECH010-90|Y
01|140242|1|1|P/N: NBT40-SF4-80|Y
01|140242|2|1|P/N: NCAT40-SF4-160|Y
01|140242|25|1|P/N: NCAT40-SF1250-3.15CP|Y
01|140242|26|1|P/N: NCAT40-SF1250-6.30CP|Y
01|140256|1|1|Table WITHOUT scales!|Y
01|140256|2|1|Table with scales.|Y
01|140271|3|1|1 full set of cables.|Y
01|140271|4|1|Includes: optic cables communication cables parameter|Y
01|140271|4|2|changes service time and travel.|Y
01|140273|1|1|REPAIR QUOTE 5AX-120MA SN: N/A|Y
01|140273|1|2|TAR-55817|Y
01|140273|1|3|Table needs complete overhaul|Y
01|140273|1|4|Bearings/Seals/Worm Wheel/Screw/Brake System|Y
01|140285|1|1|***This item is Non-Cancelable / Non-Returnable***|Y
01|140286|1|1|CONVERT CNC601 FROM YASKAWA MOTOR TO FANUC MOTORS|Y
01|140286|2|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|140286|2|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|140286|2|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|140286|2|4|TRAVEL.|Y
01|140293|7|1|Installation for any of the (3) units above.|Y
01|140304|4|1|Quoted as an in stock alternative to the 115 mm length|Y
01|140321|1|1|TAR-55783|Y
01|140321|1|2|5AX-201 SN: 3616|Y
01|140321|1|3|Table Mechanically Tested Ok.|Y
01|140321|1|4|Need some wiring/motor cover O-Ring and External Cables|Y
01|140321|5|1|Tilt Axis Power/Signal Harness|Y
01|140321|5|2|Standard Fanuc Robodrill 2 OT|Y
01|140325|16|1|Note: 3mth mfg customer to provide insert chip|Y
01|140329|1|1|Without Motors. Please advise Motor Model #'s.|Y
01|140329|3|1|Cable management for B Axis.|Y
01|140331|1|1|Reference RGA# TOR-55836|Y
01|140331|1|2|Repair of 1 x PRE-PART-01PV2N|Y
01|140359|6|1|CKFN12-12DC|Y
01|140359|6|2|CCK Coolant Nut/Cap OD12mm ID12mm Direct Mount Sealed|Y
01|140362|19|1|for 3/4 milling chuck|Y
01|140362|20|1|for SK25 holders|Y
01|140363|1|1|Including external cables and airline|Y
01|140363|1|3|Including External Cables and Airline|Y
01|140373|2|1|Substitute for HSK100A-0625-6.00|Y
01|140398|1|1|1st Batch|Y
01|140399|2|1|Substitute for HSK100A-0625-6.00|Y
01|140402|10|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|140402|10|2|External Cables Service Time & Travel.|Y
01|140419|2|1|Please confirm with customer whether they have this|Y
01|140419|2|2|spanner wrench or not|Y
01|140421|11|1|EXTERNAL POWER/FEEDBACK CABLES FOR MAKINO F5|Y
01|140422|11|1|INSTALLATION FEE INCLUDES THE EXTERNAL POWER &|Y
01|140422|11|2|FEEDBACK CABLES NEEDED FOR 4TH/5TH AXES.|Y
01|140448|1|1|Howa#: #2 Pilot Plate Cover|Y
01|140452|1|1|Howa#: #3 Plug for H01MA12|Y
01|140455|1|1|Tooling Certificate Number: 25000-2565-21120RT|Y
01|140458|1|1|Tooling Certificate Number: 25000-2566-21120RT|Y
01|140474|1|1|MOQ = 3 pieces|Y
01|140480|4|1|NCAT40-SF16-80CP|Y
01|140480|5|1|NCAT40-SF20-80CP|Y
01|140480|6|1|NCAT40-SF25-100CP|Y
01|140480|17|1|NCAT40-SF8-130CP|Y
01|140480|19|1|NCAT40-SF12-160CP|Y
01|140480|20|1|NCAT40-SF16-160CP|Y
01|140480|21|1|NCAT40-SF20-160CP|Y
01|140480|22|1|NCAT40-SF25-160CP|Y
01|140480|30|1|*Alternate to NCAT40-SF1000-5.12CP|Y
01|140486|2|1|Heidenhain Rotary Scale Kit|Y
01|140486|4|1|Cable Set|Y
01|140493|3|1|Includes: drive amp bulk head cable set external|Y
01|140493|3|2|cable set fiber optic cable communication cable|Y
01|140493|3|3|travel and labor for installation.|Y
01|140506|1|1|All parts sales are final and cannot be returned.|Y
01|140509|6|1|MZST80-ER32Z-ICE-HS2 Reference Mimatic #175592|Y
01|140509|6|2|BUT 1:2 GEAR RATIO HIGH SPEED; ICE version|Y
01|140509|6|3|Mazak Live Z-axis Hor 90deg ER32 <H-Type>|Y
01|140509|6|4|High Speed means only small shank diameters|Y
01|140509|6|5|So ER40 is not practical only possible with ER32.|Y
01|140521|1|1|installed with BIS-C-122-11/L supplied by L&N|Y
01|140521|2|1|installed with BIS-C-122-11/L supplied by L&N|Y
01|140521|3|1|installed with BIS-C-122-11/L supplied by L&N|Y
01|140522|4|1|Installation includes: optic cables comunication|Y
01|140522|4|2|cables paramter changes service time and travel.|Y
01|140523|1|1|CNCZ180LSA-BR2 SN: 20279T|Y
01|140523|1|2|Damage to casting makes table un-repairable|Y
01|140523|1|3|Quote below is for a new mechanical casting table|Y
01|140523|1|4|Will use existing replacment wiring/motor/electrical|Y
01|140523|1|5|items - ONLY mechanical items are replaced|Y
01|140539|1|1|Tooling Certificate Number:  E20410-2688-061820|Y
01|140556|1|1|SP/1st Batch|Y
01|140556|2|1|SP/1st Batch|Y
01|140556|3|1|P/L #ST50-SF0187-6.30 Confirm actual Recv'd item.|Y
01|140556|4|1|SP/1st Batch|Y
01|140556|5|1|SP/1st Batch|Y
01|140556|6|1|1st Batch|Y
01|140556|7|1|MOD Install E25-NUT/ER25-SCREW(C)|Y
01|140556|8|1|1st Batch|Y
01|140556|9|1|MOD Install E25-NUT/ER25-SCREW(C)|Y
01|140556|10|1|MOD Install E25-NUT/ER25-SCREW(C)|Y
01|140563|1|1|Motor and Cables included with Rotary Table.|Y
01|140563|2|1|Installation includes: optic cables communication|Y
01|140563|2|2|cables parameter changes service time and travel.|Y
01|140564|1|1|** guaranteed 0.0008 accuracy **|Y
01|140568|1|1|Reference RGA# LVR-55801|Y
01|140568|1|2|Repair of MNL12-SK20X-ICE-10K s/n: 8870005|Y
01|140568|1|3|(Mimatic# 184649)|Y
01|140568|2|1|Bearings seals and o-rings to be replaced.|Y
01|140570|3|1|Intallation Includes: optic cables communication|Y
01|140570|3|2|cables parameter changes service time and travel|Y
01|140575|21|1|4 PCS ETA 11/1 Balance ETA 11-12 WKS|Y
01|140580|1|1|part# MZQT47-ER32Z-HSC|Y
01|140580|1|2|ref. Mimatic# 124918|Y
01|140580|1|3|Mazak Live Z-axis Hor 90deg ER32 IntC 7MP <H-Type>|Y
01|140583|3|1|to hold .397 drill|Y
01|140599|3|1|part# MZQT47-ER32Z-HSC|Y
01|140599|3|2|ref. Mimatic# 124918|Y
01|140599|3|3|Mazak Live Z-axis Hor 90deg ER32 IntC 7MP <H-Type>|Y
01|140606|1|1|5AX-150SA-BR2 SN: 2030|Y
01|140606|1|2|RGA # TAR-55791|Y
01|140606|1|3|Table needs complete overhaul.  Bearings/Seals|Y
01|140606|1|4|Worm Wheel and worm screw.|Y
01|140631|1|1|Special package: NCTZ200L and NCTZ200R with junction|Y
01|140631|1|2|box and sheet metal for three table package.|Y
01|140631|2|1|Table with special cable set for R650X1 or X2 set up.|Y
01|140631|6|1|Rotary joint for CNCZ205LSA-BR2|Y
01|140654|11|1|EXTERNAL POWER/FEEDBACK CABLES FOR MAKINO F5|Y
01|140657|5|1|Replaces W75R5-0562-3.49(C)|Y
01|140657|6|1|Replaces W10R5-0562-3.77(c)|Y
01|140675|1|1|part# BMT65-ER40Z-GR2|Y
01|140675|1|2|BMT65 LIVE ER40; 90 DEG|Y
01|140675|1|3|2:1 GEAR; 80Nm;|Y
01|140675|1|4|RPM: 8000 INPUT TO 4000 OUTPUT|Y
01|140675|1|5|Direction rotation reversal|Y
01|140675|1|6|EXTERNAL COOLANT;|Y
01|140675|1|7|REF# 00057522 / 197179|Y
01|140675|2|1|part# BMT65-ER40Z-ICE-GR2|Y
01|140675|2|2|BMT65 LIVE ER40; 90 DEG|Y
01|140675|2|3|2:1 GEAR; 80Nm;|Y
01|140675|2|4|RPM: 8000 INPUT TO 4000 OUTPUT|Y
01|140675|2|5|Direction rotation reversal|Y
01|140675|2|6|INT/ EXT COOLANT; 1015 PSI|Y
01|140675|2|7|REF# 00057523 / 197180|Y
01|140675|3|1|part# BMT65-ER40X|Y
01|140675|3|2|BMT65 LIVE ER40; STRAIGHT;|Y
01|140675|3|3|1:1 GEAR 70Nm;|Y
01|140675|3|4|10000 RPM|Y
01|140675|3|5|EXTERNAL COOLANT;|Y
01|140675|3|6|GL= 71mm|Y
01|140675|3|7|REF # 00057524  / 197183|Y
01|140683|1|1|You can charge Panafab $10000.00 for a $15000.00 Cert|Y
01|140686|1|1|P/N: S1006-0375-4.00|Y
01|140686|1|2|1in Straight Shank Extension 3/8 End Mill Holder w|Y
01|140686|1|3|4.00 length|Y
01|140686|1|4|MOQ = 10 pieces|Y
01|140687|1|1|Specialnon cancelable nor returnable once ordered|Y
01|140687|2|1|Specialnon cancelable nor returnable once ordered|Y
01|140687|3|1|Specialnon cancelable nor returnable once ordered|Y
01|140687|4|1|Specialnon cancelable nor returnable once ordered|Y
01|140691|2|1|In stock substitute option|Y
01|140703|1|1|MOD/Install ER32-SCREW(C)|Y
01|140703|2|1|MOD/Install E32-NUT & ER32-SCREW(C)|Y
01|140703|3|1|MOD/Install E32-NUT|Y
01|140703|4|1|MOD/Install E32-NUT & ER32-SCREW(C)|Y
01|140703|5|1|Req.INS/SP Repeat SO#Various Trinity Mill/GKN-NY|Y
01|140703|6|1|Req.INS/Need confirm E32-NUT/ER32-SCREW(C) are equipped|Y
01|140703|7|1|MOD/Install E32-NUT & ER32-SCREW(C)|Y
01|140703|8|1|MOD/Install E32-NUT & ER32-SCREW(C)|Y
01|140711|1|1|CNC202MA SN: 5140 TAR-55741|Y
01|140711|1|2|Table came in for repair/evaluation|Y
01|140711|1|3|Table needs overhaul - New Bearings/Seals/WW/WS/Brake|Y
01|140717|1|1|TC# 13485-2623-040120|Y
01|140718|4|1|Torque Wrench for SK Holder|Y
01|140718|5|1|Pullstud Adapter for pullstuds - Highly recommended|Y
01|140718|6|1|Torque Wrench adapter for SK16 Collet Chuck|Y
01|140728|1|1|CNC202MA SN: 5140 TAR-55741|Y
01|140728|1|2|Table came in for repair/evaluation|Y
01|140728|1|3|Table needs overhaul - New Bearings/Seals/WW/WS/Brake|Y
01|140728|1|4|** Below quote is for Casting/Parts New Repl Core Trade|Y
01|140728|2|1|Casting Only|Y
01|140728|2|2|Customer keep original Motor Cover/Servo Motor|Y
01|140728|3|1|New Wire Harness|Y
01|140728|4|1|New Manifold Block/Solenoid/Air Fittings|Y
01|140731|3|1|Mini Manifold & Hyd. Set Up|Y
01|140734|1|1|Modify customer's existing HSK100A-C32-135 :|Y
01|140734|1|2|Installed with BIS-C-122-1 1/L BIS0015|Y
01|140734|1|3|(supplied by Lyndex-Nikken)|Y
01|140734|3|1|Modify customer's existing HSK100A-ER16-6.00:|Y
01|140734|3|2|Installed with BIS-C-122-1 1/L BIS0015|Y
01|140734|3|3|(supplied by Lyndex-Nikken)|Y
01|140734|4|1|Modify customer's existing HSK100A-ER32-6.00:|Y
01|140734|4|2|Installed with BIS-C-122-1 1/L BIS0015|Y
01|140734|4|3|(supplied by Lyndex-Nikken)|Y
01|140737|1|1|installed with BIS-C-122-11/L supplied by L&N|Y
01|140737|2|1|installed with BIS-C-122-11/L supplied by L&N|Y
01|140737|3|1|installed with BIS-C-122-11/L supplied by L&N|Y
01|140778|1|1|TAR-55632 5AX-2MT-105-120FA-M SN: 8125|Y
01|140778|1|2|Customer sent in for repair|Y
01|140778|1|3|Table is in good condition replacing seals and some|Y
01|140778|1|4|Bearings to get back to original condition|Y
01|140778|1|5|Backlash will be adjusted|Y
01|140778|33|1|New External Cable Set|Y
01|140778|33|2|Price is per axis = x2 Sets|Y
01|140803|1|1|TC#25000-2561-21020RT|Y
01|140812|1|1|Conversion of 5AX-2002DAYA SN: 2157|Y
01|140812|1|2|To convert for Kitamura 4XD 50 Taper Machine|Y
01|140812|1|3|** Pricing below includes conversion ONLY|Y
01|140812|1|4|Will check mechanics of the table at time of receiving|Y
01|140812|1|5|to determine table condition - add'l charges may apply|Y
01|140812|3|1|Old Part # HF154T-A48|Y
01|140812|13|1|External Cable Set - Price is per/axis|Y
01|140812|14|1|Interface Cable Set - Price is per/axis|Y
01|140834|1|1|Req'd INS/Revised Design|Y
01|140835|1|1|Standard 50 Taper Holder|Y
01|140835|2|1|Dual Contact Milling Chuck 50Taper|Y
01|140835|3|1|Wrench for 50 Taper Milling Chuck|Y
01|140835|8|1|Standard 50 Taper Holder - Shown in video|Y
01|140835|11|1|Torque wrench adapter sk holder- Highly recommended|Y
01|140835|12|1|Dual Contact 50Taper SK Holder|Y
01|140843|1|1|TC# 3070-2727-081320|Y
01|140853|1|1|CAT40-MDPE-M8-65U Arbor Only|Y
01|140854|1|1|P/N: S1006-0125-4.00|Y
01|140854|1|2|1 OD Straight Shank End Mill Holder 1/8 ID with|Y
01|140854|1|3|4.00 gage length|Y
01|140854|1|4|MOQ 10 pieces|Y
01|140854|2|1|P/N: S1006-0250-4.00|Y
01|140854|2|2|1 OD Straight Shank End Mill Holder 1/4 ID with|Y
01|140854|2|3|4.00 gage length|Y
01|140854|2|4|MOQ 10 pieces|Y
01|140854|3|1|P/N: S1006-0375-4.00|Y
01|140854|3|2|1 Straight Shank 3/8 End Mill Holder with|Y
01|140854|3|3|4.00 gage length.|Y
01|140854|3|4|MOQ 10 pieces|Y
01|140854|4|1|P/N: S1206-0500-XXX|Y
01|140854|4|2|1.1/4 OD Straight Shank 1/2 End Mill Holder with|Y
01|140854|4|3|8.6 OAL|Y
01|140854|4|4|MOQ 10 pieces|Y
01|140885|3|1|Will require a 35mm Riser Block to use with a CNC302|Y
01|140885|4|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|140885|4|2|External Cables Service Time & Travel.|Y
01|140885|4|3|Requires 4th Axis Software/Parameters & 2 Spare M-codes|Y
01|140885|4|4|which need to be present at time of installation.|Y
01|140889|5|1|Cable Set for CNC180OSP4|Y
01|140900|4|1|1 ful set of cables|Y
01|140921|3|1|Installation includes: Drive unit short bar fiber|Y
01|140921|3|2|optic cable communications cable bulkhead cables|Y
01|140921|3|3|external cables parameter changes service time and|Y
01|140921|3|4|travel.|Y
01|140921|4|1|RUN OFF AND PRE SHIPPING INSPECTION|Y
01|140927|2|1|The above wrenches are for the NZQT46-ER32X tool|Y
01|140927|2|2|as needed for installation and removal of holder|Y
01|140938|1|1|HSK125A-0375A-3.00|Y
01|140938|5|1|HSK125A-0375A-6.00|Y
01|140945|1|1|Test tooling is non-returnable|Y
01|140945|1|2|One time test vale only|Y
01|140945|2|1|Test tooling is non-returnable|Y
01|140945|2|2|One time test vale only|Y
01|140946|2|1|Includes adapter plate|Y
01|140946|3|1|Includes riser plate|Y
01|140946|5|1|Installation includes: Parmeter changes|Y
01|140946|6|1|Base plate to be provided to mount rotary table and|Y
01|140946|6|2|tailstock to UMC1000|Y
01|140957|1|1|C4006-1500-4.50 modified to add 2 din holes|Y
01|140957|1|2|Item is considered a special and will not be cancelled|Y
01|140957|1|3|or returned once ordered|Y
01|140961|2|1|***Confirm customer has balancing capabilites in house|Y
01|140961|2|2|***|Y
01|140963|13|1|Alternative to Mini-Mini Chuck|Y
01|140963|14|1|For .062 drill|Y
01|140963|15|1|For .076 drill|Y
01|140995|1|1|to hold .750|Y
01|140995|2|1|to hold .531|Y
01|140995|3|1|to hold 1.187|Y
01|140995|4|1|to hold 1.250|Y
01|140998|1|1|Reference RGA# CUR-55870|Y
01|140998|1|2|Repair of CAT40U-NX5-153 s/n: NDAF-023|Y
01|141001|1|1|Rotary Table Subplate 90mm. Will make current|Y
01|141001|1|2|tailstock 200mm nominal at center of Rotary Table.|Y
01|141029|1|1|Special One time Pricing|Y
01|141029|1|2|Special One Time Pricing|Y
01|141030|1|1|HSK63A-MTA4-165|Y
01|141030|1|2|Quoted as list pricingnon-returnablenon-cancelable|Y
01|141046|1|1|Reference RGA# TOR-55867|Y
01|141046|1|2|Repair of PF-2|Y
01|141046|3|1|Calibration service is included.|Y
01|141047|3|1|HSK125A-ER40-5.00-ID|Y
01|141047|3|2|HSK125A ER40 Hi Torq Bearing Nut Collet Chuck ID chip|Y
01|141047|3|3|hole UNV# 504|Y
01|141051|1|1|1st Batch|Y
01|141056|1|1|ER25  Max Torque 36.878 ft lbs|Y
01|141056|1|2|Page 8|Y
01|141056|2|1|ER32 Max Torque 51.629 ft lbs|Y
01|141056|2|2|Page10|Y
01|141056|6|1|Page 5|Y
01|141057|4|1|BOOSTER IS OPTIONAL|Y
01|141057|4|2|BREAKING FORCE WITHOUT BOOSTER: 588Nm|Y
01|141057|4|3|BREAKING FORCE WITH BOOSTER: 1568Nm|Y
01|141057|5|1|STANDARD FORGED STEEL CHUCK - NOT SET TRU|Y
01|141057|7|1|HEIDENHAIN SCALE +/-3 SECONDS WITH SCALE ADAPTER KIT|Y
01|141057|7|2|PRICE IS NET TO MDI|Y
01|141057|8|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|141057|8|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|141057|8|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|141057|8|4|TRAVEL|Y
01|141057|9|1|Amplifier is included in the RT-INSTALLATION pricing|Y
01|141057|10|1|COMPLEMENTARY TOOL CERTIFICATE FOR END USER.|Y
01|141068|3|1|1 full set of cables|Y
01|141068|4|1|Installation includes:optic cables communication|Y
01|141068|4|2|cables parameter changes service time and travel|Y
01|141074|1|1|Qty 100-499|Y
01|141074|2|1|Qty 500+|Y
01|141077|6|1|Installation includes:optic cables communication|Y
01|141077|6|2|cables parameter changes service time and travel|Y
01|141077|7|1|2 full sets of cables|Y
01|141080|9|1|In stock option to B/O 4|Y
01|141080|15|1|Extra discount provided to sell to EU at 25% discount|Y
01|141083|1|1|RGA TAR-55891|Y
01|141083|1|2|5AX-130SA-BR SN: 1865|Y
01|141083|1|3|Customer sent in for repair|Y
01|141083|1|4|Needs complete rebuild + lots of rust on inside|Y
01|141083|1|5|*** WOULD RECOMMEND NEW TABLE PURCHASE ***|Y
01|141084|1|1|Service Call Performed 8/16/2020|Y
01|141084|1|2|DD250LS-50BR2 SN: 1025G|Y
01|141084|1|3|Customer getting Overload and Excess Error Alarm|Y
01|141084|1|4|Service Tech Ohm'ed out Cable and Motor Leads and|Y
01|141084|1|5|Readings are around 2 ohms which is too low - suggests|Y
01|141084|1|6|motor strength is low.|Y
01|141084|1|7|Needs to send back to Lyndex-Nikken to send to Nikken|Y
01|141084|1|8|Japan for eval/repair.|Y
01|141084|3|1|Gas/Meals/Misc Expenses|Y
01|141088|1|1|H40A-HC12-90 Hydraulic Chuck >>12mm X 90mm Gage Lgt|Y
01|141093|1|1|For 1.5 Shank Drill|Y
01|141093|2|1|For .75 Shank ID Threading Tool|Y
01|141093|3|1|For 1 Stick Tool OD Cutting|Y
01|141093|4|1|For Cut Off Blade or Parting Off|Y
01|141112|1|1|P/N: NCAT50-C3/4-200U|Y
01|141112|1|2|TaperPlus Dual Contact CAT50 3/4 Milling Chuck with|Y
01|141112|1|3|200mm projection|Y
01|141135|7|1|HEIDENHAIN SCALE +/-3 SECONDS WITH SCALE ADAPTER KIT|Y
01|141135|7|2|PRICE IS NET TO MDI|Y
01|141135|8|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|141135|8|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|141135|8|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|141135|8|4|TRAVEL|Y
01|141135|9|1|Amplifier is included in the RT-INSTALLATION pricing|Y
01|141135|10|1|COMPLEMENTARY TOOL CERTIFICATE FOR END USER.|Y
01|141141|1|1|BMT65-SK16Z-MD|Y
01|141141|1|2|BMT65Live SK16 Dual external coolant|Y
01|141141|2|1|BMT65-SK16Z-MD-ICE|Y
01|141141|2|2|BMT56 Live SK16 Dual Internal Coolant|Y
01|141141|3|1|BMT65-ER25Z-MSD|Y
01|141141|3|2|BMT65 Live ER25 Dual 100mm Centerline External Coolant|Y
01|141141|4|1|BMT65-ER25Z-MSD-ICE|Y
01|141141|4|2|BMT65 Live ER25 Dual 100mm Centerline Internal Coolant|Y
01|141147|1|1|HSK125A-1500A-5.625-ID|Y
01|141147|1|2|HSK125A 1.1/2 End Mill Holder Aerospace|Y
01|141147|1|3|ID chip hole GKN UNV#274|Y
01|141147|4|1|HSK125A-2000A-5.50-ID|Y
01|141147|4|2|HSK125A 2in End Mill Holder Aerospace|Y
01|141147|4|3|ID chip hole GKN UNV #278|Y
01|141147|7|1|HSK125A-0375A-5.75-ID|Y
01|141147|7|2|HSK125A 3/8 End Mill Holder Aerospace|Y
01|141147|7|3|ID chip hole UNV#462|Y
01|141147|11|1|H125A-0500A-5.75-ID|Y
01|141147|11|2|HSK125A 1/2 End Mill Holder Aerospace|Y
01|141147|11|3|ID chip hole GKN UNV#463|Y
01|141147|14|1|H125A-0750A-5.75-ID|Y
01|141147|14|2|HSK125A 3/4 End Mill Holder Aerospace|Y
01|141147|14|3|ID chip hole GKN UNV#468|Y
01|141147|17|1|HSK125A-1000A-5.625-ID|Y
01|141147|17|2|HSK125A 1in End Mill Holder Aerospace|Y
01|141147|17|3|ID chip hole GKN UNV#472|Y
01|141147|19|1|HSK125A-1250A-5.625-ID|Y
01|141147|19|2|HSK125A 1.1/4 End Mill Holder Aerospace|Y
01|141147|19|3|ID chip hole GKN UNV#484|Y
01|141147|21|1|H125A-SF0750-5.00-ID  UNV#673|Y
01|141147|21|2|HSK125A 3/4 Shrink Fit Holder ID chip hole|Y
01|141147|21|3|No drawing provided by GKN.|Y
01|141147|23|1|HSK125A-SF1000-5.00-ID  UNV#674|Y
01|141147|23|2|HSK125A 1.0 Shrink Fit Holder ID chip hole|Y
01|141147|23|3|No drawing provided by GKN.|Y
01|141147|25|1|HSK125A-0625A-3.188-ID UNV#676|Y
01|141147|25|2|HSK125A 5/8 End Mill Holder - Aerospace With Chip Hole|Y
01|141147|27|1|HSK125A-SF0500-5.00-ID  UNV#677|Y
01|141147|27|2|HSK125A 1/2 Shrink Fit Holder ID chip hole|Y
01|141147|27|3|There might be overrun 1-2pcs at the end.|Y
01|141147|27|4|UNV# 677 No drawing provided by GKN.|Y
01|141147|32|1|HSK125A-SK25-127-J-IDU  SK25 Slim Chuck ID chip hole|Y
01|141147|32|2|With J Nut (Coolant) Installed  UNV#678|Y
01|141147|32|3|No drawing provided by GKN|Y
01|141147|38|1|HSK125A-ER40-5.00-ID|Y
01|141147|38|2|HSK125A ER40 Hi Torq Bearing Nut Collet Chuck|Y
01|141147|38|3|With ID Chip Hole UNV#504|Y
01|141167|1|1|1st Batch|Y
01|141170|1|1|Discount approved per Steve Lenihan|Y
01|141175|3|1|TAILSTOCK RISER|Y
01|141201|1|1|5AX-201OSP4-ME40 SN: 6357|Y
01|141201|1|2|TAR-55885|Y
01|141201|1|3|Customer sent in for repair Table Crash|Y
01|141201|1|4|Rotary axis ok Tilt axis needs full rebuild|Y
01|141218|3|1|(Adapter plate for Bison 5C chuck. Please specify|Y
01|141218|3|2|chuck model at time of order placement.)|Y
01|141230|1|1|NC5-46 Test Bar 40mm x 200mm Pull STud PS-N46E included|Y
01|141230|6|1|This kit include a special pull stud(PS-N46-CLP.)|Y
01|141234|6|1|STANDARD SHELF FOR 10DER BASE|Y
01|141234|7|1|STANDARD SHELF FOR PT6S|Y
01|141242|1|1|Table to have old style motors mounted and shipped|Y
01|141242|1|2|directly to GE|Y
01|141243|6|1|Installation includes:optic cables communication|Y
01|141243|6|2|cables parameter changes service time and travel|Y
01|141243|7|1|2 full sets of cables|Y
01|141244|3|1|1 full set of cables|Y
01|141244|4|1|Installation includes:optic cables communication|Y
01|141244|4|2|cables parameter changes service time and travel|Y
01|141245|4|1|1 ful set of cables|Y
01|141245|5|1|Installation includes:optic cables commnication|Y
01|141245|5|2|cables parameter changes service time and travel|Y
01|141256|2|1|Installation includes: drive unit short bar fiber|Y
01|141256|2|2|optic cables communication cables bulk head cable|Y
01|141256|2|3|set external cable set parameter changes service|Y
01|141256|2|4|time and travel|Y
01|141258|2|1|Installation includes: drive unit short bar fiber|Y
01|141258|2|2|optic cables communication cables bulk head cable|Y
01|141258|2|3|set external cable set parameter changes service|Y
01|141258|2|4|time and travel|Y
01|141268|1|1|1st Batch/For stock|Y
01|141268|2|1|1st Batch/For stock|Y
01|141269|24|1|H63A-SF0250-5.12CP|Y
01|141269|25|1|H63A-SF0750-5.12CP|Y
01|141269|26|1|H63A-SF6-130CP|Y
01|141269|27|1|H63A-SF8-80CP|Y
01|141269|28|1|H63A-SF14-80CP|Y
01|141271|2|1|Gosiger to perform Installation|Y
01|141271|3|1|Cable Set Included|Y
01|141272|1|1|SF-PACKAGE-CT40-STD-CP consists of Shrink Fit Machine|Y
01|141272|1|2|Accessories and 10 CAT40 Shrink Fit Holders with|Y
01|141272|1|3|Coolant Ports in preferred sizes.|Y
01|141274|1|1|SF-PACKAGE-CT50-STD-CP consists of Shrink Fit Machine|Y
01|141274|1|2|Accessories and 10 CAT50 Shrink Fit Holders with|Y
01|141274|1|3|Coolant Ports in preferred sizes.|Y
01|141276|3|1|HFO TO SUPPLY SERVO MOTORS AND CABLES LYNDEX NIKKEN TO|Y
01|141276|3|2|INSTALL|Y
01|141276|5|1|COLLET CHUCK PROMO KIT|Y
01|141276|5|2|NO CHARGE|Y
01|141281|4|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|141281|4|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|141281|4|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|141281|4|4|TRAVEL.|Y
01|141283|4|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|141283|4|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|141283|4|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|141283|4|4|TRAVEL.|Y
01|141285|1|1|Reference RGA# LVR-54767|Y
01|141285|1|2|Repair of T32024 s/n: A0645|Y
01|141285|2|1|Bearings o-rings springs and balls to be replaced.|Y
01|141285|4|1|Repair of T32024 s/n: A0035|Y
01|141285|5|1|Bearings o-rings springs and balls to be replaced.|Y
01|141287|28|1|This wrench can be used on the 75TG chucks and the|Y
01|141287|28|2|1/2 drill chuck >>CAT40-NPU13-105U-IDU|Y
01|141289|3|1|Stand for E460N Presetter|Y
01|141303|1|1|Table comes with cables|Y
01|141316|2|1|In stock non coolant port version|Y
01|141320|5|1|Installation includes:optic cables communication|Y
01|141320|5|2|cablesparameter changes service time and travel|Y
01|141329|2|1|Test1|Y
01|141331|2|1|Min. Order Qty. : 1|Y
01|141331|3|1|Min. Order Qty. : 2-4|Y
01|141331|4|1|Min. Order Qty. : 5-10|Y
01|141331|5|1|Min. Order Qty. : 11-29|Y
01|141331|6|1|Min. Order Qty. : 30+|Y
01|141331|9|1|Min. Order Qty. : 1|Y
01|141331|10|1|Min. Order Qty. : 2-4|Y
01|141331|11|1|Min. Order Qty. : 5-10|Y
01|141331|12|1|Min. Order Qty. : 11-29|Y
01|141331|13|1|Min. Order Qty. : 30+|Y
01|141331|16|1|** Ball Bearing Nut|Y
01|141343|2|1|Includes adapter plate|Y
01|141343|5|1|Installation includes: Drive unit short bar fiber|Y
01|141343|5|2|optic cable communications cable bulkhead cables|Y
01|141343|5|3|parameter changes service time and travel.|Y
01|141348|1|1|Table with motors only.|Y
01|141350|3|1|1 full set of cables|Y
01|141350|4|1|Installation Includes:optic cables communication|Y
01|141350|4|2|cables parameter changes service time and travel.|Y
01|141351|1|1|Mimatic Part # 196648 + 184275 + 197042 + 187340|Y
01|141351|1|2|Lyndex Part # TBD|Y
01|141351|1|3|BT30 Special AGH: Slitting saw holder; custom straight|Y
01|141351|1|4|arbor style|Y
01|141351|7|1|Mimatic part # 187340 - Lyndex part # TBD|Y
01|141351|7|2|Poly saw PS-G 125/25 Tinamatic-3|Y
01|141351|7|3|125mm dia blade A2.0 Z48 Chip breaker|Y
01|141351|7|4|Max cutting depth 40 ref# 00048674|Y
01|141361|2|1|Includes adapter plate|Y
01|141361|3|1|Includes riser plate|Y
01|141361|5|1|Installation includes: Drive unit short bar fiber|Y
01|141361|5|2|optic cable communications cable bulkhead cables|Y
01|141361|5|3|parameter changes service time and travel.|Y
01|141396|5|1|to hold 9/16 / alternative|Y
01|141401|1|1|Reference RGA# TOR-55882|Y
01|141401|1|2|Repair of 1 x HSK100A-NPU13C-145|Y
01|141402|1|1|Mazak live; VDI50; ER16 ; STRAIGHT;CENTER OFFSET 62.5mm|Y
01|141402|1|2|1:4 Gear;10Nm;max input 3400 RPM;max output 13600 RPM;|Y
01|141402|1|3|Ref # 00043319 but with machine interface # 00050592|Y
01|141402|2|1|Mazak live; VDI50; ER16 ; STRAIGHT;CENTER OFFSET 62.5mm|Y
01|141402|2|2|1:4 Gear;10Nm;max input 3400 RPM;max output 13600 RPM;|Y
01|141402|2|3|Ref # 00043319 but with machine interface # 00050592|Y
01|141402|3|1|Mazak live; VDI50; ER16 ; STRAIGHT;CENTER OFFSET 62.5mm|Y
01|141402|3|2|1:4 Gear;10Nm;max input 3400 RPM;max output 13600 RPM;|Y
01|141402|3|3|Ref # 00043319 but with machine interface # 00050592|Y
01|141402|4|1|Mazak live; VDI50; ER16 ; STRAIGHT;CENTER OFFSET 62.5mm|Y
01|141402|4|2|1:4 Gear;10Nm;max input 3400 RPM;max output 13600 RPM;|Y
01|141402|4|3|Ref # 00043319 but with machine interface # 00050592|Y
01|141402|5|1|Mazak live; VDI50; ER16 ; STRAIGHT;CENTER OFFSET 62.5mm|Y
01|141402|5|2|1:4 Gear;10Nm;max input 3400 RPM;max output 13600 RPM;|Y
01|141402|5|3|Ref # 00043319 but with machine interface # 00050592|Y
01|141418|2|1|CNC-EXT-Cable-R-ST (cable set up to 10 ft)|Y
01|141418|3|1|CNC Parts Mits I/O Card|Y
01|141418|4|1|Insallation & Interface (both axis)|Y
01|141423|1|1|HFO TO SUPPLY MOTOR AND CABLE|Y
01|141426|1|1|Special 35% discount core buyback program|Y
01|141443|1|1|Reference RGA# CUR-55893|Y
01|141443|1|2|Repair of MRAM-ER25-IC s/n: 19904433 02|Y
01|141443|1|3|(Mimatic# 162765)|Y
01|141443|2|1|Bearings seals o-rings and ER25 spindle along with|Y
01|141443|2|2|collet nut to be replaced.|Y
01|141468|2|1|Labor cost of reduce the length of the E32-EXT-100|Y
01|141468|2|2|7.09 --> 4.00|Y
01|141470|1|1|Modify customer's existing HSK100A-C32-200 :|Y
01|141470|1|2|Installed with BIS-C-122-1 1/L BIS0015|Y
01|141470|1|3|(supplied by Lyndex-Nikken)|Y
01|141470|3|1|Modify customer's existing HSK100A-C32-250 :|Y
01|141470|3|2|Installed with BIS-C-122-1 1/L BIS0015|Y
01|141470|3|3|(supplied by Lyndex-Nikken)|Y
01|141470|5|1|Modify customer's existing HSK100A-C1.1/4-165 :|Y
01|141470|5|2|Installed with BIS-C-122-1 1/L BIS0015|Y
01|141470|5|3|(supplied by Lyndex-Nikken)|Y
01|141475|8|1|0.531-0.551 Inch|Y
01|141509|1|1|#2 Pilot Bushing for Howa H023M12|Y
01|141516|1|1|Used Warehouse|Y
01|141527|3|1|Discount reflects a purchase order of 2 heads.|Y
01|141532|3|1|1 full set of cables.|Y
01|141546|3|1|Min. Order Qty. : 2-4|Y
01|141546|10|1|Min. Order Qty. : 2-4|Y
01|141546|16|1|** Ball Bearing Nut|Y
01|141583|1|1|HFO TO SUPPLY SERVO MOTORS AND CABLES LYNDEX NIKKEN TO|Y
01|141583|1|2|Install|Y
01|141590|2|1|16C dead lenght collet closer and adpater plate.|Y
01|141590|4|1|Sub Plate is required to match the table center height|Y
01|141590|4|2|Sub Plate not included.|Y
01|141607|1|1|1st Batch|Y
01|141616|1|1|installed with PS-123E at factory|Y
01|141616|2|1|installed on NC5-46-SK16C-90 at factory|Y
01|141621|1|1|1 table only with all accessories|Y
01|141621|3|1|1000PSI Max|Y
01|141629|1|1|P/N: MNL12-ER16X-FA15   Mim#197259|Y
01|141629|1|2|ADJUSTABLE OR FIXED AT 15 DEGREES|Y
01|141629|1|3|OVERALL LENGTH 3 FROM MOUNTING FACE|Y
01|141629|2|1|P/N: MNL12-ER16X-FA15   Mim#197259|Y
01|141629|2|2|ADJUSTABLE OR FIXED AT 15 DEGREES|Y
01|141629|2|3|OVERALL LENGTH 3 FROM MOUNTING FACE|Y
01|141654|5|1|HSK40EN-MMC4-65AT (valid Nikken part #in stock)|Y
01|141654|5|2|on Quote File|Y
01|141656|1|1|16C Collet Spec:  Material Tolerance: +.003-.004|Y
01|141662|1|1|for customer's existing PRE-HTR6A-I50 sn# 6562|Y
01|141667|12|1|coolant thru nut|Y
01|141667|13|1|slotted nut|Y
01|141667|16|1|coolant thru nut|Y
01|141667|17|1|slotted nut|Y
01|141674|1|1|With Short Motor Cover|Y
01|141674|3|1|TCE-96358 and TCE-96347 Direct Mount Cables|Y
01|141677|1|1|Reference RGA# TOR-55929|Y
01|141677|1|2|Repair of S20-UMT|Y
01|141677|3|1|Calibration service included|Y
01|141678|2|1|MOQ = 3 pcs|Y
01|141697|1|1|Reference RGA# TOR-55844|Y
01|141697|1|2|Repair of CAT50U-NX5-151 s/n: IB-052|Y
01|141743|2|1|Block the same as PB-RAM40-HAAS-ECO but we|Y
01|141743|2|2|Need to confirm the correct height|Y
01|141764|2|1|Replaces *NIK-1555-300*|Y
01|141769|2|1|Combine this adapter with the CAT50 shell mill to fit|Y
01|141769|2|2|the NMTB50  spindle|Y
01|141774|5|1|FOR 3/32 TOOL|Y
01|141790|1|1|#2 Pilot Bushing for HOWA H023M12|Y
01|141791|1|1|We only have six holders available then they are|Y
01|141791|1|2|discontinued.|Y
01|141791|1|3|Other option B4007-0020-6.00 (non dual contact)|Y
01|141791|10|1|Please Note: The collet range is 094-.078.|Y
01|141791|17|1|Please Note: We do not offer .373 X .275. IS the|Y
01|141791|17|2|end user sure it is a 373?|Y
01|141793|1|1|Feed Screw for TC-500R|Y
01|141793|1|2|PART NUM U03|Y
01|141798|6|1|STANDARD SHELF FOR 10DER BASE|Y
01|141798|7|1|STANDARD SHELF FOR PT6S|Y
01|141809|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|141809|6|1|c + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|141809|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|141809|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|141809|6|5|MUST CONFIRM MACHINE LADDER FOR DDRT TABLE|Y
01|141809|6|6|PARAMETER DATA SHEETS NEEDED/ LADDER OPTION FOR DDRT|Y
01|141809|6|7|APPLICATION TO BE CONFIRMED. AIR PURGE INCLUDED|Y
01|141819|2|1|NET price|Y
01|141830|1|1|***C4007-0016B***|Y
01|141830|2|1|***C4017-0020B***|Y
01|141830|3|1|***C4007-0020-4.00***|Y
01|141839|1|1|Req'd INS/Confirm if issues found on AIR were solved.|Y
01|141870|1|1|NBT50-FMA25.4-150>> BT50 Dual Contact Face Mill Adapter|Y
01|141870|1|2|25.4mm X 150 Gage Length|Y
01|141870|2|1|NBT50-FMA31.75-150>>BT50 Dual Contact Face Mill Adapter|Y
01|141870|2|2|31.75mm X 150mm Gage Length.|Y
01|141870|3|1|NBT50-FMB38.1-105>>BT50 Dual Contact Face Mill Adapterc|Y
01|141870|3|2|38.1mm X 105mm Gage Length|Y
01|141871|1|1|Tooling Certificate Number: 20275-2656-052120|Y
01|141871|5|1|to hold 0.218|Y
01|141882|4|1|HSK63A-R0562-2.48 System #1 Rigid Tap Holder|Y
01|141885|1|1|**Verify machine this is DIN coolant thru the flange|Y
01|141888|1|1|*NEW CP Spec. Coolant Ports can be plugged.|Y
01|141888|2|1|*NEW CP Spec. Coolant Ports can be plugged.|Y
01|141888|3|1|*NEW CP Spec. Coolant Ports can be plugged.|Y
01|141888|4|1|*NEW CP Spec. Coolant Ports can be plugged.|Y
01|141892|4|1|Installation Includes:Optic Cablescommunication cables|Y
01|141892|4|2|parameter changes service time and travel.|Y
01|141892|5|1|1 full set of cables.|Y
01|141903|1|1|P/N: MZQT5-ER32X|Y
01|141903|1|2|Mazak Live X-axis Ver Str ER32 <V-Type>|Y
01|141903|2|1|P/N: MZQT5-ER32X-ICE|Y
01|141903|2|2|Mazak Live X-axis Ver Str ER32 <V-Type> IntC|Y
01|141905|1|1|**WHOLE ASSEMBLY**|Y
01|141905|2|1|**Replacement Head only**|Y
01|141910|1|1|CAT50U-UMT 200 Like page 127 Nikken Catalog example|Y
01|141910|1|2|of BMT but need CAT50|Y
01|141911|1|1|DIN-coolant thru the flange-verify machine|Y
01|141917|1|1|1st Batch|Y
01|141918|8|1|Holds .203 to .188|Y
01|141934|38|1|NCAT40-SF16-80CP|Y
01|141934|39|1|NCAT40-SF20-80CP|Y
01|141944|1|1|Item is a non standard stock specian and is not|Y
01|141944|1|2|cancelable nore returnable once ordered|Y
01|141956|1|1|This item is considered speical once an order is|Y
01|141956|1|2|placed it cannot be cancelled or returned.|Y
01|141956|2|1|This item is considered speical once an order is|Y
01|141956|2|2|placed it cannot be cancelled or returned.|Y
01|141956|3|1|Price for this holder will be $333.00 starting 10/15/20|Y
01|141956|5|1|October 15th price listed|Y
01|141956|7|1|October 15th price listed|Y
01|141956|9|1|October 15th price is not changing|Y
01|141956|11|1|This item is discontinued onces it's ordered it|Y
01|141956|11|2|cannot be returned.|Y
01|141956|13|1|This item is discontinued. Once ordered it cannot be|Y
01|141956|13|2|returned.|Y
01|141956|14|1|This will be a modified standard tool once ordered|Y
01|141956|14|2|it cannot be cancelled or returned.|Y
01|141956|14|3|October 15th price listed= Std less30% plus $50 mod-2|Y
01|141956|14|4|Net price has been quoted no further discount should be|Y
01|141956|14|5|taken|Y
01|141977|11|1|H80F-SF1250-88.9B|Y
01|141977|11|2|See attachments in quote # 142610|N
01|141993|1|1|NK103-7D000|Y
01|141993|2|1|NK103-81000|Y
01|141996|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXE|Y
01|141996|3|1|INCLUDES BULKHEAD CONNECTORS FIBRE OPTICS DUAL|Y
01|141996|3|2|ADDITIONAL DRIVES SERVO MOTORS AND WIRE HARNESS. LABOR|Y
01|141996|3|3|TRAVEL TRAINING.|Y
01|141999|13|1|Discount reflective of total package price break|Y
01|142015|1|1|Net price reflects a complete purchase order of|Y
01|142015|1|2|30 chucks.|Y
01|142015|3|1|Net price reflects a complete purchase order of|Y
01|142015|3|2|10 chucks.|Y
01|142019|40|1|NCAT40-SF16-80CP|Y
01|142019|42|1|NCAT40-SF20-80CP|Y
01|142020|3|1|1 full set of cables|Y
01|142020|4|1|Installation includes:Optic cables communication cable|Y
01|142020|4|2|parameter changes service time and travel.|Y
01|142036|2|1|1 full set of cables|Y
01|142038|5|1|FOR 3/32 TOOL|Y
01|142039|1|1|Reference RGA# LVR-55886|Y
01|142039|1|2|Repair of MNL12-ER25Y-MD s/n: A0044|Y
01|142039|1|3|(Alps# MSA01-6J000)|Y
01|142039|2|1|Bearings O-rings Seals Collet nuts Drive shaft w/|Y
01|142039|2|2|spur gear and Spur gears to be replaced.|Y
01|142045|3|1|Substitute for NBT40-C1-90|Y
01|142051|1|1|TAR-55939 CNCZ180LSA3 SN: 7302|Y
01|142051|1|2|Rotary Table needs Rebuild|Y
01|142051|1|3|Price with Bearings/Seals/Brake Parts - $4167.53|Y
01|142051|1|4|Price with Above + New Worm Wheel/Worm Screw - $7654.3|Y
01|142052|1|1|BT30-SK13-90  BT30 SK13 Slim Chuck|Y
01|142052|2|1|BT30-MTA2-60  BT40 Morse Taper MT2 Holder|Y
01|142056|1|1|130MM tilt rotary table with Haas motors and cables.|Y
01|142058|1|1|Non standard special item is non cancelable nor|Y
01|142058|1|2|returnable once item is ordered|Y
01|142077|7|1|Conversion from Haas spec to Fanuc spec|Y
01|142086|6|1|HOT DEALS!!! Please Note:|Y
01|142086|6|2|DIST Net $121 EU Net $151 While Qtys Last|Y
01|142086|6|3|Please Note: This tool has a 4.0 gage length.|Y
01|142086|9|1|HOT DEALS!!! Please Note:|Y
01|142086|9|2|**HOT DEALS** DIST Net $139 EU Net $174 While Qtys Last|Y
01|142086|9|3|Please Note: This tool has a 5.0 gage length.|Y
01|142089|1|1|INS Req./850177/206/207/210 Trinity-Mill/GKN-NY|Y
01|142089|2|1|1st Batch|Y
01|142089|3|1|1st Batch|Y
01|142089|4|1|1st Batch|Y
01|142089|5|1|1st Batch/MOD Install SKN-10K|Y
01|142089|6|1|1st Batch/MOD Install SKN-16B|Y
01|142089|7|1|1st Batch/MOD Install SK6 Nut|Y
01|142089|8|1|INS Req./853678/680/681 Trinity Mill/GKN-NY|Y
01|142089|9|1|1st Batch|Y
01|142092|2|1|On Mimatic log for P&D confirmation|Y
01|142092|3|1|On Mimatic log for P&D confirmation|Y
01|142102|6|1|This item is considered special. Once an order is|Y
01|142102|6|2|placed it cannot be cancelled or returned.|Y
01|142103|1|1|1 PC ETA 1-2WKS 1 PC ETA 3-4 WKS|Y
01|142103|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|142112|1|1|Show display table special pricing.|Y
01|142114|5|1|Installation includes: drive unit short bar fiber|Y
01|142114|5|2|optic cables communication cables bulk head cable|Y
01|142114|5|3|set external cable set parameter changes service|Y
01|142114|5|4|time and travel|Y
01|142115|2|1|Installation includes: drive unit short bar fiber|Y
01|142115|2|2|optic cables communication cables bulk head cable|Y
01|142115|2|3|set external cable set parameter changes service|Y
01|142115|2|4|time and travel.|Y
01|142115|8|1|*** Capital Equipment's cost of 5AX-201FA is reduced|Y
01|142115|8|2|from $48400 to $47000 LIST ($33880 to $32900 NET)|Y
01|142115|8|3|when upgrading system from pneumatic to hydraulic.|Y
01|142135|1|1|TAR-55938 NCTZ150LSA3 SN8077|Y
01|142135|1|2|Table needs full rebuild: Bearings/Seals/Brake/WW/WS|Y
01|142135|38|1|New External Cable Set|Y
01|142137|1|1|Reference RGA# LVR-55651|Y
01|142137|1|2|Repair of MNL12-ER32X-ICE-10K s/n: 88149 06|Y
01|142137|1|3|(Mimatic# 100876)|Y
01|142137|2|1|Bearings seals and o-rings to be replaced.|Y
01|142137|4|1|Repair of MNL12-ER32X-ICE-10K s/n: 88149 01|Y
01|142137|4|2|(Mimatic# 100876)|Y
01|142137|5|1|Bearings seals and o-rings to be replaced.|Y
01|142165|9|1|Works with SK20|Y
01|142183|2|1|Min. Order Qty. : 1|Y
01|142183|3|1|Min. Order Qty. : 2-4|Y
01|142183|4|1|Min. Order Qty. : 5-10|Y
01|142183|5|1|Min. Order Qty. : 11-29|Y
01|142183|6|1|Min. Order Qty. : 30+|Y
01|142183|9|1|Min. Order Qty. : 1|Y
01|142183|10|1|Min. Order Qty. : 2-4|Y
01|142183|11|1|Min. Order Qty. : 5-10|Y
01|142183|12|1|Min. Order Qty. : 11-29|Y
01|142183|13|1|Min. Order Qty. : 30+|Y
01|142183|16|1|** Ball Bearing Nut|Y
01|142187|3|1|Quoted at NET price.|Y
01|142192|24|1|Package pricing applied to your quote pricing listed|Y
01|142192|24|2|cannot be used for future orders|Y
01|142204|3|1|Lyndex-Nikken to make position block upon receipt|Y
01|142204|3|2|of spindle drawing information|Y
01|142232|1|1|1st Batch|Y
01|142232|2|1|1st Batch|Y
01|142234|15|1|This wrench is for the C5007-1000-3.50 100TG Chuck.|Y
01|142234|19|1|Substitute for drill chuck|Y
01|142244|4|1|P/N: BT50-MTA1-180|Y
01|142244|4|2|BT50 Morse Taper MT1 Holder|Y
01|142244|6|1|P/N: BT50-MTA3-150|Y
01|142244|6|2|BT50 Morse Taper MT3 Holder|Y
01|142244|9|1|P/N: BT50-MTA2-180|Y
01|142244|9|2|BT50 Morse Taper MT2 Holder|Y
01|142254|2|1|5AX-130 adapter plate for 4 air vise with 3-port|Y
01|142254|2|2|Nikken rotary joint.|Y
01|142254|2|3|*** Please clarify exact workholding vise at PO ***|Y
01|142264|2|1|Unit certified in working order but sold AS IS|Y
01|142264|4|1|Installation includes: drive unit short bar fiber|Y
01|142264|4|2|optic cables communication cables bulk head cable|Y
01|142264|4|3|set external cable set parameter changes service|Y
01|142264|4|4|time and travel.|Y
01|142267|1|1|1st Batch|Y
01|142267|2|1|1st Batch|Y
01|142267|3|1|1st Batch|Y
01|142267|4|1|1st Batch|Y
01|142267|5|1|1st Batch|Y
01|142267|6|1|1st Batch|Y
01|142267|7|1|1st Batch|Y
01|142267|8|1|1st Batch|Y
01|142267|9|1|1st Batch|Y
01|142281|1|1|Can be brought in to ship  9/21 week|Y
01|142323|5|1|Consignment Terms:|Y
01|142323|5|2|Table will be consigned for a 1 year or if the table|Y
01|142323|5|3|sells whichever comes first.|Y
01|142323|5|4|Upon reciept of order from customer PO will need to be|Y
01|142323|5|5|changed to reflect the original amount quoted|Y
01|142323|5|6|If consignment is returned items need to be in a|Y
01|142323|5|7|used and sellable condition.  Any major damge to|Y
01|142323|5|8|the components will be subject to repair and/or restock|Y
01|142323|5|9|fee in order to correct the damage items.|Y
01|142328|1|1|Please Note: Unit must ship by truck.|Y
01|142328|1|2|Discount reflective of total package price break|Y
01|142328|9|1|HSK63A-SK25-90 HSK63A SK25 Slim Chuck Coolant|Y
01|142328|9|2|Max 15000rpm  90mm Gage Length|Y
01|142328|12|1|HSK63A-SK25C-90|Y
01|142328|12|2|HSK63A SK25 Slim Chuck Coolant Max 15000rpm|Y
01|142339|1|1|SK10-.120=3.048mm on size collet.|Y
01|142339|1|2|Minimum Order >> 3 collets Quoted at Net Price|Y
01|142358|18|1|Balance ETA Mid-October|Y
01|142362|1|1|Must order by 9/15 to recieve in by 9/21|Y
01|142362|10|1|Justin will chck with Jeff Bethell.He has 4 ea he was|Y
01|142362|10|2|going to return back to us|Y
01|142389|2|1|This item is considered a special and is non-cancelable|Y
01|142389|2|2|and non-returnable|Y
01|142395|1|1|Part# 174264  1.5 holder w/ Main-Dual output|Y
01|142416|1|1|Discount reflects a purchase order for one certificate.|Y
01|142416|2|1|Discount reflects a purchase order for two certificates|Y
01|142419|1|1|New alternative for 4MP-C2(T2000Z)|Y
01|142424|1|1|1 table motor cable no other accessories|Y
01|142424|2|1|Set of 2x tables with all components|Y
01|142430|23|1|KM42-10.3|Y
01|142456|1|1|RPM: up to 8000|Y
01|142456|2|1|RPM:up to 20000|Y
01|142461|1|1|Balanced to 8K RPM|Y
01|142461|2|1|Balanced to 20K RPM|Y
01|142480|5|1|MAchine ID chp hole Install chip RE-balance|Y
01|142480|5|2|$65.00/NET charge per holder|Y
01|142480|5|3|Price for 10-20 PCS should qty change please have us|Y
01|142480|5|4|Re-quote|Y
01|142480|6|1|Please confirm if this is the chip your customer needs|Y
01|142480|6|2|10mm in diameter and 4.5mm thick User date read/write|Y
01|142480|6|3|511 Byte|Y
01|142510|4|1|Tailstock is Air Brake|Y
01|142510|4|2|VH200-NO2 part # below is air lever for each tailstock|Y
01|142510|5|1|5C Deadlength Collet Closer|Y
01|142510|5|2|Hydraulic Pancake Cylinder|Y
01|142510|5|3|Price is per Spindle|Y
01|142510|5|4|All 4 spindles will clamp/unclamp same time|Y
01|142518|1|1|NCTZ200 SN: 1020C|Y
01|142518|1|2|TAR-55930|Y
01|142531|1|1|Discount reflects a purchase order of 1~4 tools.|Y
01|142531|2|1|Discount reflects a purchase order of 5~8 tools.|Y
01|142531|3|1|Discount reflects a purchase order of 9~12 tools.|Y
01|142531|11|1|Discount reflects a purchase order of 1~4 tools.|Y
01|142531|12|1|Discount reflects a purchase order of 5~8 tools.|Y
01|142531|13|1|Discount reflects a purchase order of 9~12 tools.|Y
01|142532|1|1|Reference RGA# TOR-55984|Y
01|142532|1|2|Repair of 2 x CAT40-C3/4F-85UG-M|Y
01|142542|7|1|Please Note: I crossed the J&M part number to|Y
01|142542|7|2|C40-STD however our knob is not hi-torque.|Y
01|142576|5|1|***When laying unit down cables would need to be|Y
01|142576|5|2|disconnected and connectors routed to the side of|Y
01|142576|5|3|motor cover. Please see included layout.|Y
01|142576|9|1|***When laying unit down cables would need to be|Y
01|142576|9|2|disconnected and connectors routed to the side of|Y
01|142576|9|3|motor cover. Please see included layout.|Y
01|142591|1|1|In stock substitute for 16-NASPAN|Y
01|142597|2|1|direct replacement for SKN-6WBJ(GH)|Y
01|142604|1|1|Current stock: 38pcs|Y
01|142604|2|1|Current stock: 36pcs|Y
01|142604|3|1|Current stock: 33pcs|Y
01|142608|1|1|PEG AND SOCKET CONFIGURATION|Y
01|142608|2|1|INCLUDES 3D PRINTED SOCKET AND SHEETMETAL REQUIRED|Y
01|142608|2|2|FOR 8x12 PER FACE LAYOUT.|Y
01|142610|1|1|HSK80F Shrink Fit Holder Per drawing|N
01|142610|1|2|H80F-SF1250-88.9B|Y
01|142671|1|1|ETA aprox 8-10 weeks|Y
01|142671|2|1|ETA aprox 8-10 weeks|Y
01|142678|3|1|1 full set of cables|Y
01|142678|4|1|Installation includes:Optic cablescommunication cables|Y
01|142678|4|2|parameter changes service time and travel.|Y
01|142692|3|1|1 full set of cables|Y
01|142692|4|1|Installation includes:Optic cables communication|Y
01|142692|4|2|cables parameter changes service time and travel.|Y
01|142723|2|1|If items are order by EOB 9/22 lead time would be 1wk|Y
01|142724|1|1|Pricing reflects one time test discount|Y
01|142724|1|2|Tooling is non-refundable|Y
01|142725|1|1|BMT55-ER32Z-85-MS|Y
01|142725|1|2|BMT55 Live ER32 90-Deg 1:1 Z-Axis Main/Sub <AXIAL>|Y
01|142725|1|3|C/L=85mm >> Quoted at NET price.|Y
01|142738|1|1|Reference RGA# LVR-55881|Y
01|142738|1|2|Repair of OKL3-ER32Z-OFMS s/n: AL137|Y
01|142738|1|3|(Alps# OK109-15001)|Y
01|142738|2|1|Bearings o-rings collet nuts and gears to be replaced|Y
01|142744|1|1|1st Batch|Y
01|142745|1|1|Non standard stock item that is neither cancelable|Y
01|142745|1|2|nor returnable once ordered|Y
01|142748|1|1|1st Batch|Y
01|142748|2|1|1st Batch|Y
01|142748|3|1|1st Batch|Y
01|142748|4|1|1st Batch|Y
01|142764|2|1|Balanced to 20K RPM|Y
01|142767|1|1|Tooling Certificate# 13485-2747-091720 #1|Y
01|142767|1|2|13485-2748-091720 #2 13485-2747-091720 #3|Y
01|142777|2|1|1st Batch|Y
01|142777|3|1|1st Batch|Y
01|142782|4|1|Positioning Block for Doosan VTR Machine|Y
01|142786|1|1|Tooling Certificate Number:|Y
01|142788|1|1|1st Batch For stock|Y
01|142799|2|1|Cable Set|Y
01|142803|1|1|Includes Haas Motors and Cables.|Y
01|142803|5|1|Includes Haas Motors and Cables.|Y
01|142822|10|1|***BT50-SK6-200P Slim Chuck High Speed***|Y
01|142822|12|1|***BT50-SK25-200P Slim Chuck High Speed***|Y
01|142834|1|1|Reference RGA#LVR-56008|Y
01|142834|1|2|MZQT5-ER40Z-ICE s/n: 81465 02 (Mimatic# 124877)|Y
01|142834|1|3|Preventative maintenance inspection fee|Y
01|142834|1|4|Checked TIR on tool and test ran tool after making sure|Y
01|142834|1|5|it is properly assembled.|Y
01|142856|1|1|Reference RGA# QUA-55948|Y
01|142856|1|2|Repair of 1 x MZQT5-CT40Z-ICE s/n: 18902264 03|Y
01|142856|1|3|(Mimatic# 103667)|Y
01|142856|2|1|Bearings seals and o-rings to be replaced.|Y
01|142859|1|1|New M560V with up to date OSP control|Y
01|142859|2|1|** Power/Feedback cables included **|Y
01|142878|1|1|Use balance of Tool Certificate #1735-2705-070820 then|Y
01|142878|1|2|apply TC#1735-2753-092520|Y
01|142882|3|1|Drive unit short bar fiber optic cable communication|Y
01|142882|3|2|cable bulkhead cables external cables parameter|Y
01|142882|3|3|changes service time and travel.|Y
01|142883|2|1|1-2 week ETA AFTER MACHINE SPEC CONFIRMATION WITH OUR|Y
01|142883|2|2|ENGINEERING DEPARTMENT|Y
01|142886|1|1|170mm Rotary Twin Spindle Rotary Table WITH back|Y
01|142886|1|2|mounted Mitsubishi motor included!|Y
01|142886|2|1|Twin Spindle Tailstocks with Morse Taper #3 compatible|Y
01|142886|2|2|live centers to be quoted by Butler Brothers.|Y
01|142887|1|1|Tooling Certificate Number: 13465-2615-032020|Y
01|142893|1|1|Lead will be approx 12 weeks|Y
01|142904|1|1|Tool Cert number TBA|Y
01|142913|1|1|Includes (2)HSK63 Tool Holder Pots.|Y
01|142915|5|1|Additonal 5% added for Fall promo|Y
01|142916|2|1|w/ PS-N46E|Y
01|142916|3|1|PS-N46E is included S-NC5-46-FMA25.4CS-55|Y
01|142916|4|1|w/ PS-123E|Y
01|142916|5|1|PS-123E is included S-NC5-46-FMA25.4CS-55|Y
01|142916|8|1|w/ PS-N46E|Y
01|142916|9|1|PS-N46E is included S-NC5-46-FMA25.4CS-55-MA|Y
01|142916|10|1|w/ PS-123E|Y
01|142916|11|1|Ps-123E is included S-NC5-46-FMA25.4CS-55-MA|Y
01|142917|1|1|MOTOR NEEDS TO BE SPECIFIED BY MS MACHINE|Y
01|142917|1|2|MOTOR NOT QUOTED|Y
01|142917|2|1|EXTERNAL FEED BACK CABLE EA AXIS (2) AND EXTERNAL|Y
01|142917|2|2|POWER CABLE EA AXIS (2)|Y
01|142917|3|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|142917|3|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|142917|3|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|142917|3|4|TRAVEL.|Y
01|142937|1|1|Replacement part# for C5057-0016-12.00|Y
01|142943|1|1|Includes (2)HSK63 Tool Holder Pots.|Y
01|142957|1|1|TAR-56053|Y
01|142957|1|2|CNC200FA SN: 8660|Y
01|142957|1|3|Table needs full rebuild - bearings/seals/Worm Assy.|Y
01|142957|18|1|New Motor Cover|Y
01|142961|1|1|Mori 90 Deg Twin Spindle ER32 Live Tool.|Y
01|142961|1|2|VDI40 Mounting External Coolant GL = 110mm|Y
01|142961|1|3|Mimatic part# 197362|Y
01|142961|1|4|2 PC Pricing|Y
01|142961|1|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|142961|2|1|Mori 90 Deg Twin Spindle ER32 Live Tool.|Y
01|142961|2|2|VDI40 Mounting External Coolant GL = 110mm|Y
01|142961|2|3|Mimatic part# 197362|Y
01|142961|2|4|3 PC pricing|Y
01|142961|2|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|142961|3|1|Mori 90 Deg Twin Spindle ER32 Live Tool.|Y
01|142961|3|2|VDI40 Mounting External Coolant GL = 110mm|Y
01|142961|3|3|Mimatic part# 197362|Y
01|142961|3|4|4 PC Pricing|Y
01|142961|3|5|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|142982|4|1|Included with cost of Shrink Fit Unit.|Y
01|142988|6|1|We are providing an extra 5% discount as long as the|Y
01|142988|6|2|total order placed is over $500 List price|Y
01|142992|5|1|Delivery is upon confirmation of specs|Y
01|143009|1|1|HSK100A-Blank-26.00 >>HSK100A-Blank Bar 26.00|Y
01|143017|10|1|for .218|N
01|143017|11|1|for .342|Y
01|143017|15|1|for .312|Y
01|143017|16|1|for .312|Y
01|143017|17|1|for .312|Y
01|143017|18|1|for .375|Y
01|143017|20|1|for .3425|Y
01|143017|21|1|for shank size 5mm-9.9mm****|Y
01|143017|22|1|for shank size 10mm and +  ****|Y
01|143040|1|1|TAR-56053|Y
01|143040|1|2|CNC200FA SN: 8818|Y
01|143040|1|3|Table needs full rebuild - bearings/seals/Worm Assy.|Y
01|143040|19|1|New Motor Cover|Y
01|143040|20|1|New Wire Harness - Due to Corrosion|Y
01|143051|1|1|One time test discount apply|Y
01|143051|1|2|Tooling is non-refundable|Y
01|143053|2|1|The above are rigid type options. Substiting the (S)|Y
01|143053|2|2|version to complete stock requirement|Y
01|143053|3|1|Tension/Compression Version|Y
01|143063|1|1|Tooling Certificate Number: 8098-2713-071420|Y
01|143077|1|1|Reference RGA# CUR-56060|Y
01|143077|1|2|Repair of C50RAM-MI50-180-110TP s/n: 63640 01|Y
01|143077|1|3|(Mimatic# 178152)|Y
01|143077|2|1|PM inspection and flange bolts and fastners to be|Y
01|143077|2|2|replaced. Tool checks out fine.|Y
01|143080|1|1|A63.140.5/16Z.4|Y
01|143080|2|1|A63.140.3/8Z.4|Y
01|143080|3|1|A63.144.1/2Z.4|Y
01|143080|4|1|A63.140.3/4z.4|Y
01|143080|5|1|A63.142.1/4Z.4|Y
01|143080|6|1|A63.050.1Z|Y
01|143080|7|1|A63.140.12|Y
01|143080|8|1|A63-140-16|Y
01|143080|9|1|A63-050.11/4Z|Y
01|143080|10|1|A63.050.3/4z|Y
01|143080|11|1|A63.140.1/2Z.4|Y
01|143080|12|1|A63.140.1.Z4|Y
01|143080|13|1|A63.144.5/8z.4|Y
01|143080|14|1|A63.142.1/2z.4|Y
01|143080|15|1|A63.144.1/4Z.4|Y
01|143080|16|1|A63.144.3/8z.4|Y
01|143080|17|1|A63.144.5/16Z.4|Y
01|143081|13|1|12MM COLLET FOR MMC12C|Y
01|143095|4|1|15x Holders above w/ chip & install|Y
01|143101|1|1|1 full set of Rotary Table Cables.|Y
01|143108|1|1|TAR-56053|Y
01|143108|1|2|CNC202MA SN: 5159|Y
01|143108|1|3|Table needs full rebuild - bearings/seals/Worm Assy.|Y
01|143108|3|1|Motor Cover Replacement|Y
01|143115|16|1|Please Note: Special Fall Promo is already reflected|Y
01|143115|16|2|in the discount.|Y
01|143126|2|1|stock at factory. If ordered by 10/9 ETA 10/19~10/23|Y
01|143128|1|1|A63.140.5/16Z.4|Y
01|143128|2|1|A63.140.3/8Z.4|Y
01|143128|3|1|A63-144-1/2Z.4|Y
01|143128|4|1|A63-144-3/4Z.4|Y
01|143128|5|1|A63.140.3/4z.4|Y
01|143128|6|1|A63.050.1Z|Y
01|143128|7|1|A63.050.12|Y
01|143128|8|1|H63A-SF14-90CP      A63.140.14|Y
01|143128|8|2|This item is speical once ordered it cannot be|Y
01|143128|8|3|cancelled or returned. Net price has been quoted no|Y
01|143128|8|4|further discount should be taken.|Y
01|143128|9|1|A63.050.16|Y
01|143128|10|1|H63A-050-11/4Z|Y
01|143128|11|1|A63.050.3/4.Z|Y
01|143128|12|1|A63-050.11/4Z|Y
01|143128|13|1|A63.050.3/4z|Y
01|143128|14|1|A63.140.1/2Z.4|Y
01|143128|15|1|A63.140.1.Z4|Y
01|143128|16|1|A63.144.5/8z.4|Y
01|143128|17|1|A63.142.1/2z.4|Y
01|143128|18|1|A63.144.1/4Z.4|Y
01|143134|1|1|300mm RT w/ Haas Motor & Cable Set|Y
01|143134|5|1|3-950-LRT-CNC260-10 10 Set Tru Chuck & Adapter Packge|Y
01|143134|6|1|Includes Table Installation Parameter Changes Service|Y
01|143134|6|2|Time & Travel|Y
01|143135|2|1|HSK100A end mill holder with Weldon Side Lock 2 5 GL|Y
01|143137|2|1|CNC202 without Motor|Y
01|143137|3|1|CNC202 with motor|Y
01|143137|5|1|NCT200 WITHOUT MOTOR|Y
01|143137|6|1|NCT200 WITH MOTOR|Y
01|143142|2|1|P/N: HW-CHK-ADPT-HS06-A26|Y
01|143151|2|1|NET price charge for modification|Y
01|143151|2|2|Lead time will be about 3 weeks|Y
01|143153|1|1|Req'd INS/853109/Hoffmann|Y
01|143195|3|1|CNC202 ROTARY TABLES WITH MOTORS|Y
01|143195|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|143195|4|2|INCLUDED AT NO COST TO EMS ($1550 VALUE X 3)|Y
01|143198|1|1|1st Batch|Y
01|143209|1|1|TABLE IS IN STOCK DELIVERY IS FOR FINAL INSPECTION|Y
01|143209|1|2|AND CRATING.|Y
01|143209|1|3|ONLY 1 LFET IN STOCK|Y
01|143227|1|1|Reference RGA# TOR-56065|Y
01|143227|1|2|Repair of PF-2|Y
01|143227|2|1|Calibration service is included.|Y
01|143234|24|1|Package pricing applied to your quote pricing listed|Y
01|143234|24|2|cannot be used for future orders|Y
01|143243|1|1|Tool Certificate #8115-2757-092820|Y
01|143243|12|1|ETA 10/5|Y
01|143245|1|1|BMT65-ER32Z-ICE-72-HS2|Y
01|143245|1|2|PRICE FOR (1) HIGH SPEED LIVE TOOL|Y
01|143245|3|1|BMT65-ER32Z-ICE-72-HS2|Y
01|143245|3|2|PRICE FOR (2) HIGH SPEED LIVE TOOLS|Y
01|143276|1|1|P/N: E16-008AAA|Y
01|143276|1|2|ER16 1/8 Ultra Precision collet|Y
01|143276|2|1|P/N: E16-012AAA|Y
01|143276|2|2|ER16 3/16 Ultra Precision collet|Y
01|143276|3|1|P/N: E16-016AAA|Y
01|143276|3|2|ER16 14 Ultra Precision collet|Y
01|143276|4|1|P/N: E16-024AAA|Y
01|143276|4|2|ER16 3/8 Ultra Precision collet|Y
01|143286|1|1|*** Data sheets needed prior to order acceptance ***|Y
01|143286|2|1|Installation includes: drive unit short bar fiber|Y
01|143286|2|2|optic cables communication cables bulk head cable|Y
01|143286|2|3|set external cable set parameter changes service|Y
01|143286|2|4|time and travel.|Y
01|143287|1|1|Yuasa Comparison Table|Y
01|143287|5|1|Installation Includes: Optic cables communicaiton|Y
01|143287|5|2|cables parameter changes service time and travel.|Y
01|143287|6|1|1 full set of rotary table cables|Y
01|143308|1|1|ALPHA CONFIGURATION|Y
01|143308|1|2|SINGLE POSITION 5 AXIS PLACEMENT|Y
01|143308|2|1|INSTALLATION IS NET COST|Y
01|143308|4|1|JERGENS 5RA-200-ZPS RECEIVER|Y
01|143311|1|1|Reference RGA# LVR-56072|Y
01|143311|1|2|Repair of OKL3-ER32X s/n: AL095X|Y
01|143311|1|3|(Alps# OK101-14000)|Y
01|143311|2|1|Bearings o-rings collet nut spindle cover and|Y
01|143311|2|2|spindle to be replaced. ***We will try to clean up the|Y
01|143311|2|3|original spindle and re-use; however we will not be|Y
01|143311|2|4|able to tell if it will be re-usable until assembled|Y
01|143311|2|5|and test run. if we are able to re-use the price will|Y
01|143311|2|6|be $1112.40|Y
01|143312|1|1|BT50-FMA47.625-75  BT50 47.625mm (1.7/8) Shell Mill|Y
01|143312|1|2|Holder|Y
01|143314|1|1|BRAVO CONFIGURATION|Y
01|143314|1|2|SINGLE POSITION HORIZONTAL PLACEMENT FOR HANDGUARD|Y
01|143314|2|1|INSTALLATION IS NET COST|Y
01|143314|3|1|SPECIAL SHELVES FOR HANDGUARD EXTRUSIONS|Y
01|143314|3|2|COST ALLOWS FOR TWO DIFFERENT LENGTHS|Y
01|143318|3|1|Quoted at Net Price.|Y
01|143342|4|1|BMT65-ER32Z-ICE-72-HS2|Y
01|143342|4|2|PRICE FOR (2) HIGH SPEED LIVE TOOLS|Y
01|143344|17|1|10% extra discount added|Y
01|143361|1|1|8 pcs 1-2 weeks 8 pcs ETA 10/30 Balance 3.5 months|Y
01|143368|1|1|Updated/Replacement Part# for W1005-0875-6.3C|Y
01|143368|2|1|Updated/Replacement Part# for W1505-1375-9.26C|Y
01|143375|1|1|8 pcs 1-2 weeks 8 pcs ETA 10/30 Balance 3.5 months|Y
01|143398|1|1|for 40-42mm|Y
01|143411|1|1|Reference RGA# TOR-56068|Y
01|143411|1|2|Repair of HSK63A-C1.1/4-110|Y
01|143411|6|1|Repair of CAT40-C1.1/4-105U|Y
01|143419|8|1|coolant thru nut|Y
01|143419|9|1|slotted nut|Y
01|143419|11|1|coolant thru nut|Y
01|143419|12|1|slotted nut|Y
01|143432|1|1|ENGINEERING TIME FOR FIXTURE DESIGN|Y
01|143432|1|2|DESIGN FIXTURE FOR GLOCK SLIDE FOR SHORT TERM|Y
01|143432|1|3|MANUFACTURING SOLUTION ON UMC 500|Y
01|143432|1|4|DELIVERABLE IS 3D MODEL AND 2D TECH DRAWINGS|Y
01|143432|1|5|REVOLUION TO MANUFACTURE IN HOUSE|Y
01|143432|2|1|ENGINEERING TIME FOR FIXTURE DESIGN|Y
01|143432|2|2|DESIGN FIXTURE FOR HANDGUARD PRODUCTION SHORT TERM|Y
01|143432|2|3|MANUFACTURING SOLUTION ON DNM 5700 WITH CNC180|Y
01|143432|2|4|DELIVERABLE IS 3D MODEL AND 2D TECH DRAWINGS|Y
01|143432|2|5|REVOLUTION TO MANUFACTURE IN HOUSE|Y
01|143432|6|1|4 INCH BISON SET TRU 3 JAW CHUCK|Y
01|143432|6|2|THIS WILL BE USED TO HOLD THE MITEE BITE ID CLAMP|Y
01|143432|6|3|7-866-8040|Y
01|143432|7|1|MITEEBITE SIDE-LOC XPANSION CLAMP - 31370|Y
01|143432|7|2|THIS WILL NEED TO BE MODIFIED.|Y
01|143432|8|1|5TH AXIS ROCKLOC BASE PLATE AND VICE|Y
01|143432|8|2|ITEM LENT AS CONSIGNMENT TO BE RETURNED AT FUTURE DATE|Y
01|143440|1|1|installed with PS-N46E pull stud at factory|Y
01|143440|2|1|installed on NC5-46-TB40-200 at factory|Y
01|143446|1|1|P/N: SF-START2-UNIT-200|Y
01|143446|1|2|Ala Carte - Shrink Fit Machine no cooling unit|Y
01|143446|1|3|includes all accessories standard plus 2 x Pots|Y
01|143461|1|1|Replacement nut for E25-EXT-125|Y
01|143465|1|1|ref. OK102-17000|Y
01|143465|2|1|wrench for X & Z units|Y
01|143465|3|1|setting fixture for Z-Axis|Y
01|143465|5|1|ref. OK102-18000|Y
01|143465|6|1|setting fixture for X-Axis|Y
01|143471|4|1|This quote qualifies for the extra 10% Fall Promo|Y
01|143471|4|2|discount.Howeverif the quantity drops the extra|Y
01|143471|4|3|discount will drop to 5%|Y
01|143473|25|1|9ECU-CNCZ503H|Y
01|143473|25|2|Worm Screw Eccentric Housing Assy.|Y
01|143473|26|1|WW-CN633R005/1|Y
01|143476|4|1|Please Note: We do not offer the MZQT5-BG12Z-C anymore.|Y
01|143476|4|2|I am quoting the 1.1/2  and customer can purchase a|Y
01|143476|4|3|sleeve from Global CNC.|Y
01|143492|1|1|ALPHA CONFIGURATION|Y
01|143492|1|2|SINGLE POSITION 5 AXIS PLACEMENT|Y
01|143492|2|1|INSTALLATION IS NET COST|Y
01|143514|1|1|Closeout item holder non refundable|Y
01|143522|7|1|This quote qualifies for the extra 5% Fall Promo disc|Y
01|143530|1|1|Part#MZQT47-ER25Y-MD-ICE|Y
01|143530|1|2|Desc:ER25 Straight Unit Twin Type|Y
01|143530|1|3|***Special Non-Cancelable/Non-Returnable signed|Y
01|143530|1|4|approval drawings are required prior to production***|Y
01|143530|1|5|***NET PRICING OFFERED***|Y
01|143540|1|1|MOD Install ER20-SCREW(C)|Y
01|143540|2|1|MOD Install ER20-SCREW(C)? No note on SAB PL|Y
01|143540|3|1|INS Req./850210 Trinity-Mill/GKN-NY|Y
01|143540|4|1|Ins. Req./MOD Install SKN-16B|Y
01|143540|5|1|Ins. Req./MOD Install SKN-6WK|Y
01|143540|6|1|Ins. Req./MOD Install SKN-10K|Y
01|143540|7|1|INS Req./853681 Trinity Mill/GKN-NY|Y
01|143545|1|1|MOD(Give to Keiji)**Add PressFit Label**|Y
01|143545|2|1|MOD(Give to Keiji)**Add PressFit Label**|N
01|143545|3|1|MOD(Give to Keiji)**Add PressFit Label**|Y
01|143545|4|1|1st batch/Keiji-Add PressFit Label.|Y
01|143545|5|1|1st batch/Keiji-Add PressFit Label.|Y
01|143556|1|1|Reference RGA# QUA-56018|Y
01|143556|1|2|Repair of MNL12-ER32X-ICE-10K s/n: 19905511 01|Y
01|143556|1|3|(Mimatic# 100876)|Y
01|143556|2|1|Bearings seals and o-rings to be replaced.|Y
01|143556|2|2|Tool is not considered warranty case. Spindle has marks|Y
01|143556|2|3|and appears to have been run into workpiece or chuck.|Y
01|143582|2|1|1 full set of cables|Y
01|143582|3|1|Installation includes:Optic cable communication cable|Y
01|143582|3|2|parameter changes service time and travel.|Y
01|143594|53|1|No Coolant Ports - 1.75 Length|Y
01|143594|54|1|Dual Contact with Coolant Ports - Wont affect anything|Y
01|143594|55|1|4 Length with Coolant Ports|Y
01|143595|10|1|BT30-SK25-90J|Y
01|143595|10|2|with J-Nut holder|Y
01|143631|1|1|Reference RGA# LVR-55650|Y
01|143631|1|2|Repair of BMT55-SK20X-ICE s/n: 76625 02|Y
01|143631|1|3|(Mimatic# 187162)|Y
01|143631|2|1|Bearings seals o-rings spindle and coolant sealing|Y
01|143631|2|2|bushings to be replaced.|Y
01|143631|4|1|Repair of BMT55-SK20X-ICE s/n: 76625 03|Y
01|143631|4|2|(Mimatic# 187162)|Y
01|143631|5|1|Repair is covered under warranty.|Y
01|143634|1|1|BMT65-ER32X-MS-C|Y
01|143634|4|1|BMT65-ER32Z-MS-C|Y
01|143671|4|1|FINAL PART# NC5007-0020-4.00G-DIN|Y
01|143671|7|1|Wrench attachment for handle below|Y
01|143686|3|1|Includes: Installation Parameter Changes Service|Y
01|143686|3|2|Time & Travel|Y
01|143725|7|1|Sub Plate for mounting CNC180-2W-250BMA-M|Y
01|143725|7|2|This would be done in Japan prior to shipment|Y
01|143725|8|1|Riser Plate to fit x2 MT-135 tailstocks|Y
01|143725|8|2|and line up with CNC180-2W-250BMA-M|Y
01|143727|1|1|CNCZ503HFA-8 match s/n.3116 - PTS/TICA|Y
01|143727|1|2|Rotary Joint 8+1 is included|Y
01|143727|1|3|Quoted as net price|Y
01|143754|2|1|***Special pricing for alternate taper plus in stock***|Y
01|143759|5|1|Installation includes:|Y
01|143759|5|2|Amplifier/Interface/External Cables/Fiber Optic|Y
01|143759|5|3|Cable/Relays and Parameter setup/Travel/Expenses|Y
01|143759|5|4|Customer is responsible for any software options|Y
01|143759|5|5|for additional axis and/or other upgrades|Y
01|143779|5|1|Extra 5% applied per Fall Promotion|Y
01|143784|1|1|8 pcs 1-2 weeks 8 pcs ETA 10/30 Balance 3.5 months|Y
01|143787|1|1|Tooling Certificate Number: E1094-2754-092520|Y
01|143792|3|1|Awrded extra 5% discount per our Fall Promotion|Y
01|143805|1|1|HSK63A Angle Head With Tapered Pin Mimatic# 180273|Y
01|143805|3|1|Wrenches included with head|Y
01|143806|1|1|*non-coolant|Y
01|143810|1|1|1st Batch|Y
01|143810|2|1|1st Batch|Y
01|143810|3|1|INS Req./GKN-NY REPEAT|Y
01|143812|3|1|Quoted at Net Price.|Y
01|143813|14|1|***NEW VERSION_ with coolant ports***|Y
01|143823|1|1|MIM REF> 192270|Y
01|143823|4|1|MIM Ref. 190886|Y
01|143823|4|2|MI50 25.4mm Face/Shell Mill Adapter|Y
01|143823|8|1|MIM Ref. 155413|Y
01|143823|9|1|MIM Ref. 155442|Y
01|143823|9|2|MI50 27mm Face/Shell Mill Adapter|Y
01|143840|11|1|Need to confirm new price|Y
01|143849|1|1|Test discount applied - non refundable|Y
01|143889|1|1|***Mach: Not for Erickson Quick Change.|Y
01|143889|1|2|x2 QTY Offered to maximize operation|Y
01|143889|1|3|May need slight ADJ if any issue on auto draw bar.***|Y
01|143891|5|1|Includes the following:|Y
01|143891|5|2|3 port manifold with 3 solenoid stacks|Y
01|143891|5|3|Solenoids single acting pressure switches and|Y
01|143891|5|4|pressure reducing valves.|Y
01|143891|5|5|Max pressure is 1000psi with our Hydraulic Pump|Y
01|143891|5|6|Hoses and fittings included - Need length when ordering|Y
01|143901|1|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|143914|3|1|***Part#C50-9000(H)disontinuedmoving forward our new|Y
01|143914|3|2|part#C50-9000(H)-EU is standard for re-ordering***|Y
01|143938|1|1|This is a part number change only from C4017-0008-4.00|Y
01|143944|2|1|Standard in stock substitute for line 1 item|Y
01|143949|1|1|P/N: CAT40-BCB82-150|Y
01|143961|3|1|Rotary Joint Part # TCD-A3025|Y
01|143961|3|2|3 Port|Y
01|143964|1|1|Howa#  HH9C150 Y-2311-10 Seal Kit|Y
01|143966|14|1|Applies to total quoted. Discount will not be valid if|Y
01|143966|14|2|quote falls under required amount.|Y
01|144004|2|1|Lyndex-Nikken to make block upon receipt of spindle|Y
01|144004|2|2|drawing confirmation.|Y
01|144009|1|1|Increased discount from 35 to 40% per promo|Y
01|144023|1|1|CAT50 5/16 Shrink-3.38 GL|Y
01|144023|1|2|C6Y3-0312 (old command part #)|Y
01|144023|4|1|CAT50 5/8 SHRINK-3.63 GL|Y
01|144023|4|2|C6Y3-0625|Y
01|144023|5|1|CAT50 3/4 SHRINK-3.63 GL|Y
01|144023|5|2|C6Y3-0750|Y
01|144023|6|1|CAT50 1in SHRINK-3.63 GL|Y
01|144023|6|2|C6Y3-1000|Y
01|144023|7|1|CAT50 5/16 SHRINK-5.00 GL|Y
01|144023|7|2|C6Y4-0312|Y
01|144023|8|1|CAT50 3/8 SHRINK-5.00 GL|Y
01|144023|8|2|C6Y4-0375|Y
01|144023|10|1|CAT50 3/4 SHRINK-5.00 GL|Y
01|144023|10|2|C6Y4-0750|Y
01|144049|1|1|Non standard special not cancelable or returnable once|Y
01|144049|1|2|order is placed|Y
01|144055|1|1|Reference RGA# CUR-56103|Y
01|144055|1|2|C50RAM-MI50-180-110TP s/n: 64652 01 (Mimatic# 178152)|Y
01|144055|1|3|PM maintenance has been done and coolant checked out|Y
01|144055|1|4|good. This is for preventative maintenance evaluation|Y
01|144055|1|5|and replacements of flange bolts and hardware.|Y
01|144061|1|1|P/N: CAT40-Q34-65U|Y
01|144061|1|2|Cat40 Taper Base holder|Y
01|144061|1|3|SPECIAL|Y
01|144061|2|1|P/N: 34-BCB82-85|Y
01|144061|2|2|BCB Boring Head|Y
01|144061|5|1|P/N: 34-BCB82-85|Y
01|144061|5|2|BCB Boring Head|Y
01|144063|1|1|Allen Wrench included with holder|Y
01|144074|5|1|Optinal if required:|Y
01|144074|5|2|4 new M-codes including a Fanuc I/O module and ladder|Y
01|144074|6|1|Optional if required:|Y
01|144074|6|2|AC power outlet for the indexing controller|Y
01|144084|1|1|PF-RMSS-16.0(OH)|Y
01|144084|1|2|Nikken Carbide PF Radical Reamer|Y
01|144084|1|3|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|144101|3|1|***Change item***Line #4 revised to|Y
01|144107|4|1|Discount applies to total amount of quote.|Y
01|144120|1|1|Tooling Certificate NO. 3070-2727-081320|Y
01|144141|1|1|Tooling Certificate Number: E1660-2710-070920|Y
01|144142|3|1|Quoted at NET price.|Y
01|144142|3|2|Please Note: Once a purchase order is placed it cannot|Y
01|144142|3|3|be cancelled or returned.|Y
01|144148|2|1|NET PRICE|Y
01|144176|2|1|Both items are considered non standard stock and will|Y
01|144176|2|2|not be cancelable nor returnable once ordered|Y
01|144190|3|1|Repeat order|Y
01|144210|2|1|No compatible con el Sistema Erickson Quick Change|Y
01|144215|2|1|BT30-SK16-75|Y
01|144215|2|2|Stock in Japan|Y
01|144215|4|1|1-4pcs|Y
01|144215|4|2|Balluff chip customer supplied|Y
01|144215|5|1|21+pcs|Y
01|144215|5|2|Balluff chip customer supplied|Y
01|144215|5|3|``|N
01|144215|7|1|1-4pcs|Y
01|144215|7|2|Balluff chip Lyndex-Nikken supplied|Y
01|144215|8|1|21+pcs|Y
01|144215|8|2|Balluff chip Lyndex-Nikken supplied|Y
01|144219|12|1|Extra 10% discount applied to each line item|Y
01|144220|2|1|Extra 5% promo discount added to line item|Y
01|144221|8|1|Extra 10% discount applied to each line item|Y
01|144226|4|1|KM1.1/4-21/32|Y
01|144227|8|1|Extra 10% discount applied to each line item|Y
01|144239|1|1|E236 will work on Larth Presetters|Y
01|144251|6|1|HYDRAULIC MANIFOLD/PRESSURE REGULATOR FOR|Y
01|144251|6|2|AIR/HYDRAULIC BOOSTER SETUP|Y
01|144251|7|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|144266|2|1|Option A|Y
01|144266|3|1|Tailstock comes with needed tail Plate|Y
01|144266|3|2|Option B|Y
01|144272|1|1|320MM face plate with RJ 8+1 built-in without motor.|Y
01|144272|2|1|320MM support table with 4+1p RJ.|Y
01|144279|1|1|Back Order ETA 27/32In 10/21/20|Y
01|144279|1|2|Back Order ETA 3/8In None on order from Factory|Y
01|144279|1|3|***We can ship partial or ship and call it complete***|Y
01|144279|1|4|We just need to know how to proceed. If 3/8In required|Y
01|144279|1|5|please advise and we will request delivery update from|Y
01|144279|1|6|factory and should have lead-time 1-2 days.|Y
01|144299|6|1|15 Mid-Nov 7pcs 16 wks|Y
01|144299|8|1|10pcs Mid-Nov/3pcs 16 wks|Y
01|144322|8|1|Please Note:NMTB40 will stick out of end because of|Y
01|144322|8|2|draw bar style.|Y
01|144328|1|1|Face Value $14285.00|Y
01|144362|5|1|Extra 5% Discount has been added for our Fall PROMO|Y
01|144362|5|2|5% on orders above $500 and 10% on orders above $5000|Y
01|144373|2|1|Replacement to B30-4500 purchased on SO#854458TC order|Y
01|144374|1|1|1st Batch/843694 McDaniel/Wilson|Y
01|144376|4|1|Extra 5% discount applied per Fall Promo|Y
01|144379|5|1|The Installaion quoted is an M-Code Installation only|Y
01|144393|1|1|Tooling Certificate Number: 13687-2468-102319|Y
01|144396|32|1|An extra 10% Discount has been added for our Fall PROMO|Y
01|144396|32|2|*5% on orders above $500 and 10% on orders above $5000|Y
01|144412|2|1|Extra 5% discount applied per Fall Promo|Y
01|144414|1|1|Cheersun AIR I#10122001|Y
01|144414|1|2|NO INS Req'd.|Y
01|144417|4|1|Extra 10% Fall Promo discount applied|Y
01|144433|1|1|Tooling Certificate Number: E1094-2754-092520|Y
01|144481|1|1|Quoted Net Price.|Y
01|144484|1|1|IT40-Z16-109|Y
01|144498|1|1|Cheersun BOAT I#10122001-1|Y
01|144498|1|2|NO INS Req'd.|Y
01|144498|2|1|Cheersun BOAT I#10122001-1|Y
01|144498|2|2|NO INS Req'd.|Y
01|144516|1|1|TAT-105 SN: 5017B|Y
01|144516|1|2|Repair/Eval Request - Needs new bearings/seals|Y
01|144531|1|1|25000-2778-100920|Y
01|144551|2|1|*** Reconfirm Center Height***|Y
01|144553|1|1|***Highspeed Factory Japan***|Y
01|144553|4|1|***Highspeed Factory Japan***|Y
01|144553|6|1|***Highspeed Factory Japan***|Y
01|144553|10|1|***Highspeed Factory Japan***|Y
01|144553|12|1|**Balance x2 Highspeed Factory Japan***|Y
01|144553|13|1|***Highspeed Factory Japan***|Y
01|144553|13|2|***Final L-N Part#BT50-SK6-165P***|Y
01|144553|14|1|***Highspeed Factory Japan***|Y
01|144553|15|1|***Highspeed Factory Japan***|Y
01|144553|15|2|***Final Part#BT50-SK25-105P***|Y
01|144553|16|1|***BT50-C1.1/4-105 Factory Stock QF?***|Y
01|144553|64|1|****ALL ITEMS SHIPPING FROM FACTORY ONCE PO HAS BEEN|Y
01|144553|64|2|PLACED ORDER IS NON-CANCELABLE***|Y
01|144559|1|1|Non standard stock item is not cancelable nor|Y
01|144559|1|2|returnable once ordered|Y
01|144560|1|1|Tool Certificate #1735-2753-092520|Y
01|144571|1|1|3/4 Turning Tool Holder for Main and Sub|Y
01|144571|2|1|1-1/4 Boring Bar Holder for Main & Sub|Y
01|144577|5|1|Balance ETA 3.5-4 months.|Y
01|144584|1|1|Drawing 027-092|Y
01|144584|3|1|Drawing 027-496|Y
01|144609|3|1|NET price quoted|Y
01|144609|5|1|NET price quoted|Y
01|144622|5|1|Riser plate for PBA-105|Y
01|144635|2|1|***Price Break***|Y
01|144635|3|1|***Price Break***|Y
01|144642|5|1|MTD/Cust responsibility for Machine Options/Ladder Mod|Y
01|144642|5|2|Includes DriveDrive cables internalexternal and cable|Y
01|144642|5|3|management.|Y
01|144646|1|1|Tool Certificate #25000-2764-100520RT|Y
01|144647|6|1|MTD/Cust responsibility for Machine Options/Ladder Mod|Y
01|144647|6|2|Includes DriveDrive cables internalexternal and cable|Y
01|144647|6|3|management.|Y
01|144651|1|1|Repl for C5003-0003-1.58|Y
01|144652|1|1|TOOL 1 - 1.5 MITSUBISHI FACE MILL|Y
01|144652|2|1|TOOL 2 - .750 FORM TOOL|Y
01|144652|3|1|TOOL 3 - .2125 FORM TOOL|Y
01|144652|5|1|TOOL 4 - .500|Y
01|144652|6|1|TOOL 5 - .250 FINISHER|Y
01|144652|8|1|TOOL 6 - .250 ROUGHER|Y
01|144652|12|1|TOOL 8 - .25 LOLLIPOP ENDMILL|Y
01|144652|14|1|TOOL 9 - .0945 MITSUBISHI DRILL|Y
01|144652|16|1|TOOL 10 - .800 FORM TOOL|Y
01|144652|17|1|TOOL 11 - 1.248 PH HORN|Y
01|144652|19|1|TOOL 12 - .9843 MITSUBISHI DRILL|Y
01|144652|22|1|TOOL 13 - .1285 AIRCRAFT EXTENSION DRILL|Y
01|144652|24|1|TOOL 14 - .375 CHAMFER MILL 90 DEGREES|Y
01|144652|26|1|TOOL 15 - .181 MITSUBISHI DRILL|Y
01|144652|28|1|TOOL 16 - .125 FINISHER|Y
01|144652|30|1|TOOL 17 - 1.001 COOLANT THRU REAMER|Y
01|144652|34|1|TOOL 18 - 9/16 - 18 THREADMILL|Y
01|144652|36|1|TOOL 19 - .375 ROUGHER|Y
01|144652|38|1|TOOL 20 - .375 FINISHER|Y
01|144652|40|1|TOOL 21 - .440 FORM TOOL|Y
01|144652|42|1|TOOL 22 - .500 BALL NOSE|Y
01|144652|44|1|TOOL 23 - BROACH|Y
01|144652|45|1|TOOL 24 - .315 COUNTERBORE TOOL|Y
01|144652|47|1|TOOL 25 - .125 BALLNOSE|Y
01|144652|49|1|TOOL 26 - .1845 COUNTERBORE TOOL|Y
01|144652|51|1|TOOL 27 - .250 MITSUBISHI DRILL|Y
01|144652|53|1|TOOL 28 - .1875 FINISHER|Y
01|144652|55|1|TOOL 29 - DETENT CUTTER|Y
01|144660|1|1|SP Back-up screw for NTN (Min. order Qty. 5)|Y
01|144660|1|2|M18 P1.5 L35mm Tapered head at 60deg.|Y
01|144660|2|1|SP Back-up screw for NTN (Min. order Qty. 50)|Y
01|144660|2|2|M18 P1.5 L35mm Tapered head at 60deg.|Y
01|144672|1|1|Repair of 5AX-300WXF|Y
01|144672|1|2|Needs new brake seals/O-Rings/and Worm Screw Assy.|Y
01|144672|1|3|Tilt Axis is OK|Y
01|144685|1|1|Includes (2) Tool Holder Pots|Y
01|144694|1|1|TOOLS # 1|Y
01|144694|3|1|TOOL # 2|Y
01|144694|5|1|TOOL # 3|Y
01|144694|8|1|TOOL # 4|Y
01|144694|10|1|TOOL # 5|Y
01|144694|13|1|TOOL # 6|Y
01|144694|16|1|TOOL # 7|Y
01|144694|19|1|TOOL # 8|Y
01|144694|22|1|TOOL # 9|Y
01|144694|25|1|TOOL # 10|Y
01|144694|27|1|TOOL # 11|Y
01|144694|30|1|TOOL # 12|Y
01|144694|34|1|TOOL # 13|Y
01|144694|37|1|TOOL # 14|Y
01|144694|40|1|TOOL # 15|Y
01|144694|43|1|TOOL # 16|Y
01|144694|46|1|TOOL # 17|Y
01|144694|51|1|TOOL # 18|Y
01|144694|54|1|TOOL # 19|Y
01|144694|57|1|TOOL # 20|Y
01|144694|60|1|TOOL # 21|Y
01|144694|63|1|TOOL # 22|Y
01|144694|66|1|TOOL # 23|Y
01|144694|68|1|TOOL # 24|Y
01|144694|71|1|TOOL # 25|Y
01|144694|74|1|TOOL # 26|Y
01|144694|77|1|TOOL # 27|Y
01|144694|80|1|TOOL # 28|Y
01|144694|83|1|TOOL # 29|Y
01|144696|1|1|KM42-15.65 Non stock standard special that it not|Y
01|144696|1|2|cancelable  nor returnable once ordered|Y
01|144696|1|3|Pricing valid thru 3/2021|Y
01|144704|1|1|TOOLS # 1|Y
01|144704|3|1|TOOL # 2|Y
01|144704|5|1|TOOL # 3|Y
01|144704|8|1|TOOL # 4|Y
01|144704|10|1|TOOL # 5|Y
01|144704|13|1|TOOL # 6|Y
01|144704|16|1|TOOL # 7|Y
01|144704|19|1|TOOL # 8|Y
01|144704|22|1|TOOL # 9|Y
01|144704|23|1|NO SEALED COLLETS IN OUR ER AT 3MM|Y
01|144704|25|1|TOOL # 10|Y
01|144704|27|1|TOOL # 11|Y
01|144704|30|1|TOOL # 12|Y
01|144704|34|1|TOOL # 13|Y
01|144704|37|1|TOOL # 14|Y
01|144704|40|1|TOOL # 15|Y
01|144704|43|1|TOOL # 16|Y
01|144704|46|1|TOOL # 17|Y
01|144704|47|1|EQUIVALENT TO 7/8 SEALED COLLET|Y
01|144704|51|1|TOOL # 18|Y
01|144704|54|1|TOOL # 19|Y
01|144704|57|1|TOOL # 20|Y
01|144704|60|1|TOOL # 21|Y
01|144704|63|1|TOOL # 22|Y
01|144704|66|1|TOOL # 23|Y
01|144704|68|1|TOOL # 24|Y
01|144704|71|1|TOOL # 25|Y
01|144704|74|1|TOOL # 26|Y
01|144704|77|1|TOOL # 27|Y
01|144704|80|1|TOOL # 28|Y
01|144704|83|1|TOOL # 29|Y
01|144714|1|1|1st Batch|Y
01|144714|2|1|1st Batch|Y
01|144714|3|1|1st Batch|Y
01|144719|30|1|Promo applies to total amount quoted. If quote amount|Y
01|144719|30|2|falls under required amount additional discount will|Y
01|144719|30|3|not be valid.|Y
01|144724|1|1|Reference RGA# LVR-56146|Y
01|144724|1|2|Repair of MNL12-SK20Z-ICE-10K s/n: 8741805|Y
01|144724|1|3|(Mimatic# 184650)|Y
01|144724|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|144724|2|2|1 output spindle|Y
01|144745|1|1|TAR-56172|Y
01|144745|1|2|CNC250LFA SN: 2780|Y
01|144745|3|1|9ECU-CNC250L Worm Screw Assembly|Y
01|144751|25|1|A tariff surcharge of 8% will be added to every order|Y
01|144751|25|2|placed after September 1st 2025(until further notice).|Y
01|144751|25|3|This surcharge will be acknowledged upon acceptance|Y
01|144751|25|4|of every order.|Y
01|144758|1|1|***MZST80-ER40X-OFF-HS1.5-ICE***|Y
01|144758|1|2|***Gear Ratio is 1:1.5 Speed Increaser|Y
01|144765|6|1|Promo applies to total amount quoted.|Y
01|144768|16|1|Offering SK holders as substitute for 1/8 End Mill|Y
01|144768|17|1|Qualifies for extra 10% Fall Promo discount|Y
01|144768|17|2|List price total for PO against quote must remain|Y
01|144768|17|3|above $5K List Price or discount drops to 5%|Y
01|144783|22|1|Extra 5% awarded for Fall Promo for list total > $500|Y
01|144784|5|1|Additional 5% Discount has been added per Fall Promo|Y
01|144801|5|1|Qualifies for extra 5% Fall Promo discount.If order|Y
01|144801|5|2|total drops below $500 this discount will not apply|Y
01|144803|17|1|C6-SK16-120-J  Polygon C6 SK16 Slim Chuck|Y
01|144803|17|2|If ordered by 11/3 ETA to L-N 11/23|Y
01|144803|38|1|C6-SK20-70-J Polygon C6 SK20 Slim Chuck|Y
01|144803|38|2|If ordered by 11/3/ETA to L-N 11/17|Y
01|144803|39|1|C6-SK20-120-J  Polygon C6 SK16 Slim Chuck|Y
01|144803|39|2|If ordered by 11/3/ETA to L-N 11/17 .|Y
01|144804|4|1|Pricing is vailed through end of month 10/31/2020|Y
01|144810|3|1|Requires Riser plate to match center height of 321|Y
01|144810|4|1|Riser Plate|Y
01|144815|1|1|Quoted at Net Pricing|Y
01|144819|1|1|HSK63A-SK13-90P SK13 Slim Chuck High Speed|Y
01|144841|2|1|POSITIONING BLOCK FOR HAAS VF2 RIGHT ANGLE HEAD|Y
01|144856|1|1|4 DIN Holes MOD in-house|Y
01|144856|1|2|CAT50-C3/4-105U-IDU|Y
01|144856|3|1|4 DIN Holes MOD in-house|Y
01|144856|3|2|CAT50-C1-105U-IDU|Y
01|144858|10|1|>5K List price qualifies for extra 10% Fall Promo Disc|Y
01|144858|10|2|If order drops below 5K discount does not apply|Y
01|144865|10|1|Applies to total amount quoted.|Y
01|144880|5|1|An additional %5 Discount has been added to this RFQ|Y
01|144880|5|2|for our HARDWORK Fall Promo|Y
01|144902|2|1|BMT65-SK16Z-ICE-72-HS2|Y
01|144902|2|2|1:2 GEARED; 12000 RPM Z AXIS LIVE TOOL|Y
01|144902|4|1|STANDARD 1:1 LIVE TOOL; 6000 RPM|Y
01|144910|8|1|Qualifies for extra 5% Fall Promo discount.If order|Y
01|144910|8|2|total drops below $500 this discount will not apply|Y
01|144923|1|1|Mimatic Part#124840 LN#OKL4-MI50X-ICE|Y
01|144923|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|144923|1|3|ETA afte receipt of order/drawing approval|Y
01|144928|1|1|MOD(Give to Keiji)**Add PressFit Label**|Y
01|144928|2|1|MOD(Give to Keiji)**Add PressFit Label**|Y
01|144928|3|1|MOD(Give to Keiji)**Add PressFit Label**|Y
01|144928|4|1|MOD(Give to Keiji)**Add PressFit Label**|Y
01|144928|5|1|MOD(Give to Keiji)**Add PressFit Label**|Y
01|144929|1|1|*For 1 - need 2pc per holder|Y
01|144929|2|1|for 3/4|Y
01|144929|3|1|for 1/2|Y
01|144929|4|1|for 3/8|Y
01|144929|5|1|for 1/4|Y
01|144929|6|1|for 3/16|Y
01|144929|7|1|for 1/8|Y
01|144933|5|1|Extra 5% discount per Fall Promo has been applied|Y
01|144933|5|2|Order list price total must be >$500 to qualify|Y
01|144937|1|1|Drawing Part #SF5.9-C16-121|Y
01|144937|1|2|Quoted at NET price.|Y
01|144938|2|1|Extra 5% discount provided per Fall Promo|Y
01|144939|1|1|Test tooling non refundable|Y
01|144942|1|1|HSK63A-SM40-152.4|Y
01|144942|1|2|HSK63A 40mm Pilot w/ 152.4mm L dimension|Y
01|144954|37|1|Quote qualifies for the extra 10% Fall Promo Discount|Y
01|144954|37|2|Order must be >5K to retain extra 10% >$500 is 5%|Y
01|144955|5|1|Please note that an additional 10% discount has already|Y
01|144955|5|2|been applied to the items on this quotation per our|Y
01|144955|5|3|Fall Promo.|Y
01|144955|7|1|BMT45-ER16-AD-ICE|Y
01|144955|7|2|BMT45 ER16 LIVE Adjustable INT/EXT Coolant|Y
01|144955|7|3|Machine: Hardinge Talent 51MSY|Y
01|144955|7|4|*NET Price|Y
01|144955|7|5|**This is a special. Approval drawing will be required.|Y
01|144955|7|6|Once this has been purchased it cannot be cancelled or|Y
01|144955|7|7|returned.|Y
01|144957|5|1|Subplates for Rotary Table and Tailstock.|Y
01|144957|6|1|**Please note additional expenses may occur pending|Y
01|144957|6|2|fit up and routing of cabling due to unknown machine|Y
01|144957|6|3|model design.|Y
01|144960|3|1|SPECIAL NET PRICING ON THIS PRODUCT DUE TO 1 1/4|Y
01|144960|3|2|END MILL HOLDER BEING OUT OF STOCK UNTIL 11/30/20|Y
01|144960|5|1|Extra 5% discount awarded per Fall Promo|Y
01|144960|5|2|Order placed must remain > $500 List Price to qualify|Y
01|144973|1|1|Non stock standard special neither cancelable nor|Y
01|144973|1|2|returnable once ordered|Y
01|144973|2|1|Non stock standard special neither cancelable nor|Y
01|144973|2|2|returnable once order is placed|Y
01|144978|1|1|HSK63F ER20 6.75 GL|Y
01|144978|1|2|1 pc or MOQ|Y
01|144980|3|1|SPECIAL NET PRICING ON THIS PRODUCT DUE TO 1 1/4|Y
01|144980|3|2|END MILL HOLDER BEING OUT STOCK UNTIL 11/30/20|Y
01|144980|5|1|Extra 5% discount applied per Fall Promo|Y
01|144980|5|2|To retain discount order placed must be >$500 list|Y
01|144984|17|1|CAT50 AGH; ER40; External coolant;110mm taper pin pitch|Y
01|144984|17|2|L=205mm; L1=105mm;Max 150Nm; 5000 RPM;|Y
01|144984|17|3|ref drwg # 00042103 but coolant through their spindle|Y
01|144984|17|4|and have it come out through the external nozzle;|Y
01|144996|1|1|Reference RGA# LVR-56157|Y
01|144996|1|2|Repair of OKL3-ER32Z s/n: AL1035 (Alps# OK101-13000)|Y
01|144996|2|1|Bearings o-rings collet nut and spindle to be|Y
01|144996|2|2|replaced.|Y
01|144996|4|1|Repair of OKL3-ER32X s/n: AL1182 (Alps# OK101-14000)|Y
01|144996|5|1|Bearings o-rings collet Nut and spindle to be|Y
01|144996|5|2|replaced.|Y
01|145016|4|1|Installation includes: drive unit short bar fiber|Y
01|145016|4|2|optic cables communication cables bulk head cable|Y
01|145016|4|3|set external cable set parameter changes service|Y
01|145016|4|4|time and travel.|Y
01|145026|1|1|Reference RGA# QUA-55883|Y
01|145026|1|2|For customer's PRE-E346-H63 s/n: 100668|Y
01|145026|2|1|Returning PRE-E346-BD PRE-GAUGE-H63 and PRE-SPDL-H63.|Y
01|145026|2|2|Inspection time and fee will be waived at this time as|Y
01|145026|2|3|a courtesy.|Y
01|145031|1|1|3 Gage Length|Y
01|145031|2|1|4 Gage Length|Y
01|145031|3|1|4 Gage Length|Y
01|145031|4|1|60mm Gage Length & 10mm Keys|Y
01|145031|5|1|4.50 Gage Length|Y
01|145031|6|1|4.50 Gage Length|Y
01|145035|5|1|for a Fadal 4020|Y
01|145044|1|1|Everything included for Install.|Y
01|145049|3|1|Extra 5% discount provided for Fall Promo|Y
01|145049|3|2|Order placed must exceed $500 List total to qualify|Y
01|145062|4|1|External cable set specs to be provided by Hurco|Y
01|145067|3|1|BRS-12.5|Y
01|145067|4|1|BRS-14.2  MOQ: 1-2|Y
01|145067|5|1|BRS-3.3|Y
01|145067|6|1|BRS-4.3|Y
01|145067|7|1|BRS-5.05|Y
01|145067|8|1|BRS-5.2|Y
01|145067|10|1|BRS-6.8 MOQ: 1-2|Y
01|145067|11|1|BRS-7.1|Y
01|145067|12|1|BRS-8.4|Y
01|145067|13|1|BRS-9.7|Y
01|145067|14|1|BRS-8.5|Y
01|145073|2|1|TBD|Y
01|145084|1|1|ETA 3 weeks per Mimatic Log|Y
01|145084|4|1|Per Mimatic log suggested to order MZQT47-ER32-HS2ICE|Y
01|145084|4|2|ER25 no longer available|Y
01|145093|11|1|An extra 10% discount has been applied per Fall Promo|Y
01|145093|11|2|Order must remain over $5K List Total to retain disc|Y
01|145102|2|1|**Please note additional expenses may occur pending|Y
01|145102|2|2|routing of cabling and machine design.|Y
01|145107|11|1|Applies to total amounted quoted.|Y
01|145108|1|1|Thread Size:3/4-16UNF-2A|Y
01|145111|12|1|Promo valid on total amount quoted.|Y
01|145118|5|1|60MM riser for TAT-320 Support table to match center|Y
01|145118|5|2|height of the CNCB450FA-M|Y
01|145121|34|1|**for QCFC65-20M-EMR|Y
01|145131|5|1|Special non-cancelable & non-returnable ARO|Y
01|145139|1|1|Part # C8-BLANK120-300 C8 Blank Bar (CPT.80.300.D120BL)|Y
01|145139|1|2|Item is a non stock standard neither cancelable nor|Y
01|145139|1|3|returnable once ordered.PRICING IS NET PRICE|Y
01|145146|3|1|The items are all considered specials and are note|Y
01|145146|3|2|cancelable nor returnable|Y
01|145151|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|145151|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|145151|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|145151|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|145151|5|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|145151|6|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|145151|7|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|145153|1|1|Reference RGA# LVR-55555|Y
01|145153|1|2|Repair of BMT65-ER32Z-MS  s/n: 19908160 01|Y
01|145153|1|3|(Mimatic# 186493)|Y
01|145153|2|1|Bearings seals o-rings and input spindle to be|Y
01|145153|2|2|replaced|Y
01|145153|4|1|Repair of BMT65-ER32X s/n: 19907578 07|Y
01|145153|4|2|(Mimatic# 186489)|Y
01|145153|5|1|Bearings seals o-rings and ER32 spindle to be|Y
01|145153|5|2|replaced.|Y
01|145158|10|1|*customer must machine desired size to 0.070|Y
01|145158|13|1|*customer must machine desired size to 0.082|Y
01|145158|16|1|*customer must machine desired size to 0.302|Y
01|145158|19|1|*customer must machine desired size to 0.281|Y
01|145158|22|1|*customer must machine desired size to 0.096|Y
01|145158|33|1|**coolant collet nut required to thread coolant disc|Y
01|145158|33|2|to create seal|Y
01|145158|36|1|*customer must machine desired size to 0.310|Y
01|145158|39|1|**coolant collet nut required to thread coolant disc|Y
01|145158|39|2|to create seal|Y
01|145160|7|1|AX551R073|Y
01|145167|4|1|NET price charge for position block|Y
01|145188|1|1|SF-PACKAGE-CT40-STD-CP: consists of Shrink Fit Machine|Y
01|145188|1|2|Accessories and 10 CAT40 Shrink Fit Holders with|Y
01|145188|1|3|Coolant Ports in preferred sizes.|Y
01|145194|1|1|Includes everything needed for install.|Y
01|145207|2|1|CAT40 works on all but E410H model|Y
01|145207|3|1|CAT50 works on all but E500/650 model|Y
01|145207|4|1|HSK100A works on all models|Y
01|145207|11|1|CAPTO6|Y
01|145207|12|1|CAPTO8|Y
01|145207|19|1|CAPTO6|Y
01|145207|20|1|CAPTO8|Y
01|145216|4|1|Mitsubishi External Cables|Y
01|145218|1|1|100MM Centerline|Y
01|145218|2|1|72mm Centerline - ICE Version can run wet or dry|Y
01|145227|3|1|Extra 10% discount applied per Fall Promo|Y
01|145228|2|1|Includes T-slot Face Plate|Y
01|145230|3|1|***customer to confirm thread pitch.***|Y
01|145238|1|1|Reference RGA# CUR-56176|Y
01|145238|1|2|Repair of CAT40U-NX5-153 s/n: NDAF-021|Y
01|145238|9|1|Repair of CAT40U-NX5-153 s/n: NDAF-023|Y
01|145243|4|1|use for 3/32|Y
01|145244|1|1|1st batch after Rev|Y
01|145244|2|1|1st batch after Rev|Y
01|145244|3|1|1st batch|Y
01|145244|4|1|1st batch after Rev|Y
01|145246|1|1|RGA TAR-56164|Y
01|145246|1|2|CNC300 SN1306|Y
01|145246|19|1|New Internal Wire Harness Power and Feedback|Y
01|145246|20|1|Inspection Fee for Test Running Motor|Y
01|145247|2|1|Replacement Motor - Brand new HC53T-SZ(OSE105S2)|Y
01|145247|4|1|RGA TAR-56164|Y
01|145247|4|2|CNC300 SN1296|Y
01|145247|23|1|New Internal Wire Harness Power and Feedback|Y
01|145247|24|1|Inspection Fee for Eval/Testing Motor|Y
01|145256|1|1|Must ship with 2x (SF-POT-xx) 1ea x SF-RACK-POT|Y
01|145256|1|2|SF-RACK-HEAT-RING|Y
01|145259|4|1|5% Extra Discount provided per Fall Promo|Y
01|145264|1|1|Rotary Table without Motor - 4400 lb Vert Cap.|Y
01|145264|1|2|NOTE: Requires 500psi Hydraulic Pressure to activate|Y
01|145264|1|3|the Rotary Table Brake.|Y
01|145264|3|1|NOTE: Requires 500psi Hydraulic Pressure to activate|Y
01|145264|3|2|the Support Table Brake. Rotary Table and Support|Y
01|145264|3|3|Table Brake must be activated simultaneously to|Y
01|145264|3|4|avoid twisting of the part and may share the same|Y
01|145264|3|5|hydraulic source.|Y
01|145264|4|1|240mm Riser for TAT-501 to meet 550mm center height of|Y
01|145264|4|2|CNC803MA Rotary Table.|Y
01|145264|4|3|NOTE: This is custom made item. No cancellation allowed|Y
01|145264|4|4|once order is received.|Y
01|145266|3|1|Extra 5% discount applied for Fall Promo|Y
01|145268|4|1|1 E32-570(C)collet missing from set to cause back order|Y
01|145268|4|2|Can order each collet individually at $74 less 40 for|Y
01|145268|4|3|earlier partial shipment if can't wait|Y
01|145268|5|1|Extra 5% discount added per Fall Promo|Y
01|145271|1|1|INS Req./NCR227-1 Undersize ID bores?|Y
01|145274|5|1|GL +6mm|Y
01|145285|2|1|Told Andrew the complete system requires the coolant|Y
01|145285|2|2|nut and disk wrench as well.He was going to check w/cus|Y
01|145285|3|1|Offered this option in case they weren't aware of it|Y
01|145304|2|1|Installation includes:optic cables communication cable|Y
01|145304|2|2|parameter changes service time and travel.|Y
01|145304|3|1|Cables|Y
01|145306|2|1|Installation includes:optic cables communication cable|Y
01|145306|2|2|parameter changes service time and travel.|Y
01|145306|3|1|Cables|Y
01|145345|1|1|Tooling Certificate Number: 13687-2777-100920|Y
01|145352|4|1|use for 3/32|Y
01|145355|2|1|Extra 10% discount applied per Fall Promo|Y
01|145355|2|2|If only 1ea ordered the discount will drop to 5%|Y
01|145358|1|1|*1st Batch/Desgin Change/For stock|Y
01|145367|1|1|HSK63A-SM40-152.4|Y
01|145367|1|2|HSK63A 40mm Pilot w/ 152.4mm L dimension|Y
01|145368|1|1|HSK63A-SM40-152.4|Y
01|145368|1|2|HSK63A 40mm Pilot w/ 152.4mm L dimension|Y
01|145370|1|1|HSK63A-SM40-152.4|Y
01|145370|1|2|HSK63A 40mm Pilot w/ 152.4mm L dimension|Y
01|145372|2|1|OKL4-ER40X-ICE Okuma Live X-axis 90deg ER40 3000rmp DIN|Y
01|145372|2|2|<SIDE> ICE>>Internal and External Coolant and can be|Y
01|145372|2|3|run dry.|Y
01|145392|33|1|Promo discount applies to total amount of quote.|Y
01|145400|5|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|145400|5|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|145400|5|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|145400|5|4|TRAVEL.|Y
01|145415|5|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|145415|5|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|145415|5|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|145415|5|4|TRAVEL.|Y
01|145416|5|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|145416|5|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|145416|5|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|145416|5|4|TRAVEL.|Y
01|145420|2|1|5 Days after receipt of Lathe Spindle Info Form|Y
01|145447|1|1|JIS/DIN M18 JIS3/4|Y
01|145473|7|1|You asked for 1.5 this 1.250 is the largest we have|Y
01|145481|4|1|Promo applies to total amount quoted.|Y
01|145488|1|1|Reference RGA# LVR-56166|Y
01|145488|1|2|Repair of MNL12-ER32Z-MS  s/n: A0218  (Alps# T32216)|Y
01|145488|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|145488|2|2|replaced.|Y
01|145488|4|1|Repair of MNL12-ER32Z-MS  s/n: A0234  (Alps# T32216)|Y
01|145488|5|1|Bearings o-rings collet nuts and spindle to be|Y
01|145488|5|2|replaced.|Y
01|145488|7|1|Repair of MNL12-ER32Z-MS  s/n: A0744  (Alps# T32216)|Y
01|145488|8|1|Bearings o-rings collet nuts and spindle to be|Y
01|145488|8|2|replaced.|Y
01|145499|3|1|Machine ID chip/Install chip/Rebalance|Y
01|145503|2|1|Power and feedback cables for A and B|Y
01|145504|1|1|1st Batch|Y
01|145504|2|1|1st Batch|Y
01|145504|3|1|1st Batch|Y
01|145504|4|1|1st Batch|Y
01|145504|5|1|1st Batch|Y
01|145504|6|1|1st Batch|Y
01|145504|7|1|1st Batch|Y
01|145504|8|1|1st Batch|Y
01|145504|9|1|1st Batch|Y
01|145504|10|1|1st Batch|Y
01|145504|11|1|1st Batch|Y
01|145504|12|1|INS Req/GKN-NY|Y
01|145504|13|1|INS Req/GKN-NY|Y
01|145550|1|1|P/N: SF-START2-UNIT-200|Y
01|145550|1|2|Ala Carte - Shrink Fit Machine only - no cooling unit|Y
01|145554|1|1|If existing adapter plate OD measures 190mm diameter|Y
01|145554|1|2|they will not need an adapter plate|Y
01|145554|2|1|**Lyndex-Nikken to thread to fit draw tube|Y
01|145554|2|2|**Customer must confirm threads at time of order|Y
01|145556|1|1|Tooling Certificate Number:13687-2755-092820|Y
01|145572|2|1|Overhaul for CNC260FA includes 25 hours of labor|Y
01|145572|8|1|Overhaul for TAT-200 includes 8 hours of labor|Y
01|145572|11|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|145572|11|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLE|Y
01|145572|11|3|EXTERNAL CABLES PARAMETER CHANGES SERVICE TIME|Y
01|145572|11|4|TRAVEL FEE and LABOR.|Y
01|145573|1|1|Can not be cancelled or returned.|Y
01|145573|1|2|Quoted at Net Pricing|Y
01|145586|1|1|With T-Slot Faceplate|Y
01|145586|1|2|A8iS Motor to use existing 80A drive with CMX|Y
01|145586|2|1|Installation price is based upon CMX having 80A|Y
01|145586|2|2|4th Axis Drive already installed for DD Table Option|Y
01|145599|1|1|Pending P&D info from Quote File|Y
01|145617|5|1|Promo is already included in the discount quoted.|Y
01|145621|1|1|1st Batch|Y
01|145630|4|1|We increased your discount by 5% from 28-33% per our|Y
01|145630|4|2|Fall Promo discount.Order total must be >$500 List|Y
01|145632|2|1|shank .251 square .191|Y
01|145641|1|1|Start2 Shrink Fit Machine includes: 1 Shrink Fit|Y
01|145641|1|2|Machine 1 Cooling Unit 5-piece induction ring set|Y
01|145641|1|3|5-piece cooling bracket set storage racks and 2x pots|Y
01|145641|1|4|PLUS 10-piece CAT40 Taper Coolant Port standard length|Y
01|145641|1|5|Shrink Fit Holders.|Y
01|145649|1|1|Please Note: Quoted at Net price this item is used|Y
01|145649|1|2|and Stefan is aware of this. We have sent him pictures|Y
01|145649|1|3|however he will need the positioning block which we|Y
01|145649|1|4|will make in house. This item has a 1 year warranty|Y
01|145649|1|5|for parts and labor. This item is non returnable.|Y
01|145657|15|1|Discount increased from 35-40% ea line per Fall Promo|Y
01|145661|1|1|**6pc MIN order|Y
01|145671|1|1|CN450BB013|Y
01|145671|1|2|Setting Ring|Y
01|145680|1|1|Delivery TBD|Y
01|145680|2|1|A & B Axis Power and feedback cables|Y
01|145687|13|1|Promo applies to quote total.|Y
01|145693|1|1|Reference RGA# LVR-56209|Y
01|145693|1|2|Repair of MNL12-ER25X-OFF-HS-ICE s/n: 8853303|Y
01|145693|1|3|(Mimatic# 189424)|Y
01|145693|2|1|Bearings seals o-rings and 1 ER25 spindle to be|Y
01|145693|2|2|replaced.|Y
01|145694|5|1|replaces SKN-10B(GH)|Y
01|145694|6|1|replaces SKN-6WBJ(GH)|Y
01|145694|7|1|replaces SKN-6WB(GH)|Y
01|145694|8|1|replaces SKN-10BJ(GH)|Y
01|145696|22|1|***3.86 gl|Y
01|145702|2|1|Charge to modify standard holder to DIN|Y
01|145704|3|1|Discount increased from 10-15% per Fall Promo|Y
01|145716|2|1|Discount increased from 30-40% per Fall Promo|Y
01|145719|6|1|Este es un producto especial no cancelable|Y
01|145719|6|2|y no retornable.|Y
01|145719|7|1|Este es un producto especial no cancelable|Y
01|145719|7|2|y no retornable|Y
01|145719|9|1|Este es un producto especial no cancelable|Y
01|145719|9|2|y no retornable|Y
01|145719|10|1|Este es un producto especial no cancelable|Y
01|145719|10|2|y no retornable|Y
01|145719|11|1|Este es un producto especial no cancelable|Y
01|145719|11|2|y no retornable|Y
01|145719|12|1|Este es un producto especial no cancelable|Y
01|145719|12|2|y no retornable|Y
01|145719|13|1|Este es un producto especial no cancelable|Y
01|145719|13|2|y no retornable|Y
01|145727|1|1|Okuma LB4000 : Okuma Live BMT60 U-tool; ER25;|Y
01|145727|1|2|1:1 Gear; Max 6000 RPM; Reference drawing 00049339|Y
01|145727|1|3|Part number TBD. Quoted at Net Price.|Y
01|145727|2|1|Okuma LB4000 : Okuma Live BMT60 U-tool; ER25;|Y
01|145727|2|2|1:1 Gear; Max 6000 RPM; Reference drawing 00049339|Y
01|145727|2|3|Part number TBD. Quoted at Net Price.|Y
01|145735|3|1|We have a non CP version in stock|Y
01|145735|4|1|Discount increased from 35-40% per Fall Promo|Y
01|145736|1|1|1st Batch|Y
01|145739|1|1|Birla AIR I#202170171(WHS:IN)|Y
01|145739|1|2|No need to INS this item.|Y
01|145740|1|1|Reference RGA# LVR-56101|Y
01|145740|1|2|Repair of OKLU4-ER50X s/n: AL0044|Y
01|145740|1|3|(Alps# OK104-11002)|Y
01|145740|2|1|Bearings o-rings collet nut nad small parts to be|Y
01|145740|2|2|replaced.|Y
01|145742|1|1|P/N: CHS-3.175 NSK Collet Catalog# 90593|Y
01|145745|44|1|Discount increased by 10% ea item per Fall Promo|Y
01|145746|4|1|Installation includes: drive unit short bar fiber|Y
01|145746|4|2|optic cables communication cables bulk head cable|Y
01|145746|4|3|set external cable set parameter changes service|Y
01|145746|4|4|time and travel.|Y
01|145770|1|1|Quoted as NET pricing non reurnablenon-cancelable|Y
01|145770|2|1|Quoted as NET pricing non reurnablenon-cancelable|Y
01|145770|3|1|Quoted as NET pricing non reurnablenon-cancelable|Y
01|145770|4|1|Quoted as NET pricing non reurnablenon-cancelable|Y
01|145770|5|1|Quoted as NET pricing non reurnablenon-cancelable|Y
01|145771|1|1|P/N: C4006-1250-4.00B|Y
01|145771|1|2|CAT40 1.1/4 End Mill Holder Balanceable|Y
01|145771|1|3|MIN ORDER QUANTITY REQUIRED 10 PIECES|Y
01|145771|2|1|P/N: C4006-1250-4.00B-DIN|Y
01|145771|2|2|CAT40 1.1/4 End Mill Holder Balanceable with DIN|Y
01|145771|2|3|MINIMUM ORDER QUANTITY REQUIRED 10 PIECES|Y
01|145806|1|1|MOD(Give to Keiji)**Add PressFit Label**|N
01|145806|2|1|MOD(Give to Keiji)**Add PressFit Label**|N
01|145806|3|1|MOD(Give to Keiji)**Add PressFit Label**|N
01|145806|4|1|MOD(Give to Keiji)**Add PressFit Label**|N
01|145806|5|1|MOD(Give to Keiji)**Add PressFit Label**|N
01|145806|6|1|INS/1st batch|N
01|145807|1|1|New Table + New Motor/Wiring|Y
01|145807|1|2|To be same specification as table below in for repair|Y
01|145807|3|1|Repair Quote CNC321LFA SN: 4238|Y
01|145807|3|2|TAR-56191|Y
01|145807|19|1|New Internal Wire Harness|Y
01|145821|10|1|Please Note: Fall Promo of 5% is already included in|Y
01|145821|10|2|discount quoted.If quote goes under $500.00 list the|Y
01|145821|10|3|discount will drop 5%.|Y
01|145822|5|1|Also for E460|Y
01|145822|7|1|Promo thru 12/30/20|Y
01|145836|2|1|Discount increased from 30-35% per Fall Promo|Y
01|145847|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|145847|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|145851|3|1|Installation includes: Bulkhead cables external cables|Y
01|145851|3|2|parameter changes service time and travel.|Y
01|145851|3|3|1-1/2 days estimated installation time.|Y
01|145851|3|4|DDR Drive must be present!|Y
01|145851|4|1|Included with installation package.|Y
01|145851|5|1|Included with installation package.|Y
01|145851|6|1|Included with installation package.|Y
01|145851|7|1|Included with installation package.|Y
01|145851|8|1|Special price with core deposit using exisitng motor|Y
01|145853|1|1|KM32-15.85|Y
01|145853|1|2|KM32 Collet with 15.85mm ID|Y
01|145853|2|1|KM32-20.75|Y
01|145853|3|1|KM32-15.75|Y
01|145853|5|1|KM32-11.5|Y
01|145853|6|1|KM32-13.8|Y
01|145853|7|1|KM32-9.2|Y
01|145853|8|1|KM32-9.4|Y
01|145853|9|1|KM32-8.2|Y
01|145856|7|1|Extra discount 5% already added to quote. If quantities|Y
01|145856|7|2|change we will need to re-quote.|Y
01|145859|1|1|Tooling Certificate Number:|Y
01|145859|1|2|25000-2725-080720|Y
01|145859|1|3|25000-2726-080720|Y
01|145860|20|1|**Note: An extra 10% Discount has been applied to this|Y
01|145860|20|2|Quotation for our Fall Promo.|Y
01|145861|5|1|**Note: An additional 10% Discount has been applied to|Y
01|145861|5|2|this quotation for our Fall Promo.|Y
01|145880|1|1|Old part number to C5007-0040-6.00.Once stock depleted|Y
01|145880|1|2|the new number C5007-0040-6.00 will apply|Y
01|145880|4|1|Pricing includes 5% Fall Promo discount|Y
01|145882|1|1|Please Note: New part number quoted for SKN-6WBJ (GH)|Y
01|145882|3|1|Please Note: New part number quoted for SKN-10BJ (GH)|Y
01|145882|12|1|Please Note: The Fall Promo 10% discount has been|Y
01|145882|12|2|added to the pricing.|Y
01|145882|12|3|If quantities change we will need to re-quote.|Y
01|145886|6|1|Please note that an additional 5% discount has been|Y
01|145886|6|2|applied to this quotation per our Fall Promo.|Y
01|145900|16|1|4.13 projection|Y
01|145900|30|1|to hold 7/8|Y
01|145900|31|1|to hold 1|Y
01|145900|37|1|ANSI B- central coolant supply|Y
01|145902|1|1|Reference RGA# TOR-56218|Y
01|145902|1|2|Repair of PF-2|Y
01|145902|4|1|Calibration service included|Y
01|145914|1|1|Part Number TBD >> CAT40 AGH ER25; 90DEG TWIN SPINDLE;|Y
01|145914|1|2|L1=114mm:1:1 GEAR: 8000RPM: 25Nm:APPROX WEIGHT 4.9KG|Y
01|145914|1|3|REF DRWG# 00045619/Wrenches Included >>NET price quoted|Y
01|145914|2|1|Part Number TBD >> CAT40 AGH ER25; 90DEG TWIN SPINDLE;|Y
01|145914|2|2|L1=114mm:1:1 GEAR: 8000RPM: 25Nm:APPROX WEIGHT 4.9KG|Y
01|145914|2|3|REF DRWG# 00045619/Wrenches Included >>NET price quoted|Y
01|145915|1|1|Reference RGA# TOR-56178|Y
01|145915|1|2|Repair of 1 x NCAT50-C1.1/4-105U-IDU|Y
01|145915|9|1|Repair of NCAT50-C1.1/4-105U-IDU|Y
01|145915|15|1|Repair of NCAT50-C1.1/4-105U|Y
01|145915|23|1|Repair of MCAT50-C1.1/4-105U|Y
01|145915|29|1|Repair of NCAT50-C1.1/4-105U|Y
01|145943|6|1|Increased discount by 5% per Fall Promo|Y
01|145944|1|1|Fall Promo of 10% extra has been added to discount.|Y
01|145975|1|1|CAT40|Y
01|145975|2|1|BT40|Y
01|145994|1|1|Includes Haas Motor and Cable Set|Y
01|145998|1|1|TAR-56337 5AX-220PG8FA SN: N/A|Y
01|145998|1|2|Table needs complete rebuild|Y
01|145998|10|1|Part # PG8-058 + WS-PG-059|Y
01|145998|38|1|Internal Cables|Y
01|145998|38|2|TCE-A1068 TCE-93542 TCE-A1067 TCE-93541|Y
01|145998|39|1|Packing Seal PG-027 & PG-030|Y
01|145998|40|1|Alignment Pins part # PG8-099|Y
01|145998|41|1|Scale Shaft for Rotary Axis #S54|Y
01|146004|3|1|P/N: HA40L-ER32X-ICE|Y
01|146004|3|2|Haas Live ER32 live tool coupling|Y
01|146005|1|1|1st Batch|Y
01|146016|1|1|Reference RGA# LVR-56224|Y
01|146016|1|2|Repair of OKEX-ER32Z-MS s/n: AL0050|Y
01|146016|1|3|(Alps# OKA00-21001-01)|Y
01|146016|2|1|Bearings o-rings collet nuts and gears to be replaced|Y
01|146025|7|1|Extra 5% discount applied for Fall Promo|Y
01|146041|6|1|Extra 5% discount applied per Fall Promo|Y
01|146053|2|1|Extra 5% discount applied per Fall Promo|Y
01|146057|2|1|An additional 5% discount has already been applied to|Y
01|146057|2|2|these items per our Fall Promo.|Y
01|146058|3|1|Extra 5% discount applied per Fall Promo|Y
01|146059|3|1|Extra 5% discount applied per Fall Promo|Y
01|146070|15|1|This holder does not have pluggable coolant ports|Y
01|146070|30|1|This holder does not have pluggable coolant ports|Y
01|146070|31|1|This holder does not have pluggable coolant ports|Y
01|146077|3|1|Extra 5% Fall Promo Discount Applied|Y
01|146107|5|1|Confirm Center Height|Y
01|146107|7|1|Applies to total amount of quote. If quantities change|Y
01|146107|7|2|will need to requote.|Y
01|146109|2|1|Extra 5% discount awarded as part of order 863789|Y
01|146109|2|2|shipped on 10/27|Y
01|146113|6|1|H63F-SF8-75|Y
01|146113|6|2|HSK63F 8mm Shrink Fit with 75mm gl|Y
01|146114|1|1|Includes Haas motor and cable set.|Y
01|146114|2|1|Includes #4 Morse taper socket|Y
01|146117|1|1|Includes Haas Motor and Cable Set.|Y
01|146119|1|1|Part# ZKG12-12-50L|Y
01|146119|1|2|#1 TorqCon Tap Collet|Y
01|146130|8|1|CAT40 40mm End Mill Holder|Y
01|146130|11|1|CAT40 Morse Taper MT5 Holder|Y
01|146136|3|1|Kit includes: dual axis drive unit short bar fiber|Y
01|146136|3|2|optic cables communications cables bulk head|Y
01|146136|3|3|cable set & external cables.|Y
01|146136|3|4|** Heartland carries responsibility of communicating|Y
01|146136|3|5|specification of all aboe components prior to|Y
01|146136|3|6|shipment.|Y
01|146136|3|7|** Support charge of $100.00 per hour for phone|Y
01|146136|3|8|assistance related to the installation of these|Y
01|146136|3|9|products.|Y
01|146136|3|10|(L-N installation alternate option = $12000 NET)|Y
01|146148|3|1|SPECIAL NET PRICING ON THIS PRODUCT DUE TO 1 1/4|Y
01|146148|3|2|END MILL HOLDER BEING OUT STOCK UNTIL 11/30/20|Y
01|146148|5|1|Extra 5% discount applied per Fall Promo|Y
01|146148|5|2|To retain discount order placed must be >$500 list|Y
01|146160|1|1|Delivery is 1 wk. if order by Mon.|Y
01|146160|2|1|Pancake Cylinder Old# TCD-43045|Y
01|146160|3|1|Mini Manifold & Hyd. Set Up|Y
01|146183|1|1|CAT40 40mm End Mill Holder|Y
01|146183|2|1|CAT40 40mm end mill holder|Y
01|146183|5|1|Cat40 MT5 Morse Taper Holder with 4.13 gage length|Y
01|146197|12|1|Offering in place of dual contact|Y
01|146197|14|1|Extra 10% Fall Promo discount has been applied|Y
01|146202|2|1|Applies only to C50-testbar-14.00|Y
01|146202|6|1|Cat50 test bar 2diameter 18 GL|Y
01|146202|6|2|no flange no wooden case|Y
01|146207|3|1|Fall promo 5% added to discount.|Y
01|146211|4|1|Extra 5% Fall Promo Discount applied|Y
01|146215|3|1|Extra 5% discount applied per Fall Promo|Y
01|146232|3|1|Extra 10% discount applied|Y
01|146235|11|1|Extra 5% Fall Promo discount has been applied|Y
01|146239|1|1|Cannot be cancelled or returned.|Y
01|146239|3|1|Cannot be cancelled or returned.|Y
01|146247|1|1|Shows 0 stock however item is actually in stock.|Y
01|146247|1|2|Delivery: 1-2 days|Y
01|146268|4|1|P/N: ER32-SET-18|Y
01|146268|4|2|consists of 3mm - 20mm (no 1/2mm sizes included)|Y
01|146268|5|1|P/N: E25-SET-15|Y
01|146268|5|2|consists of 3mm-16mm (no 1/2 sizes included)|Y
01|146268|13|1|P/N: E16-SET-10|Y
01|146268|13|2|consists of 1mm-10mm (no 1/2 sizes included)|Y
01|146269|1|1|Quoted at NET pricing|Y
01|146269|2|1|Quoted at NET price.|Y
01|146274|2|1|customer providing balluf chip to be installed on|Y
01|146274|2|2|holder and balanced|Y
01|146274|3|1|HS coolant nut installed|Y
01|146274|4|1|coolant back-up screw and coolant tube installed|Y
01|146274|8|1|customer providing balluf chip to be installed on|Y
01|146274|8|2|holder and balanced|Y
01|146274|9|1|HS coolant nut installed|Y
01|146274|10|1|coolant back-up screw and coolant tube installed|Y
01|146274|14|1|customer providing balluf chip to be installed on|Y
01|146274|14|2|holder and balanced|Y
01|146274|15|1|HS coolant nut installed|Y
01|146274|16|1|coolant back-up screw and coolant tube installed|Y
01|146277|1|1|CNC300 SN1296|Y
01|146277|1|2|TAR-56164|Y
01|146277|2|1|Inspection Fee|Y
01|146277|2|2|$200 for Rotary Table $150 for Servo Motor|Y
01|146278|1|1|Reference RGA# LVR-56235|Y
01|146278|1|2|Repair of MZQT5-ER40Z-C s/n: 5163405|Y
01|146278|1|3|(Mimatic# 124877)|Y
01|146278|2|1|Bearings seals o-rings and input spindle to be|Y
01|146278|2|2|replaced.|Y
01|146284|1|1|B5001-1250-2.00CP|Y
01|146284|1|2|BT50 1-1/4 Face Mill Holder w/Coolant Ports|Y
01|146287|3|1|HSK63A-SLS32-110|Y
01|146287|3|2|HSK63A 32mm Side Lock Holder w/110mm Gage Length|Y
01|146287|4|1|HSK63A-SLS20-80|Y
01|146287|4|2|HSK63A 20mm Side Lock Holder w/80mm Gage Length|Y
01|146287|5|1|HSK63A-SLS25-110|Y
01|146287|5|2|HSK63A 25mm Side Lock Holder w/110mm Gage Length|Y
01|146296|4|1|This price does include the servo motors|Y
01|146298|22|1|Promo price $7.00 net each|Y
01|146298|22|2|(for every holder purchased promo applies)|Y
01|146322|1|1|Balance of Back Orders 3 months.|Y
01|146325|2|1|Please note that an additional 5% discount has already|Y
01|146325|2|2|been applied to this item per our Fall Promo!|Y
01|146335|6|1|Promo 5% has been added to discount shown.|Y
01|146342|3|1|Promo of 5% has been added to discount. If quantities|Y
01|146342|3|2|change we will need to requote.|Y
01|146343|5|1|12 CHUCK FOR CNC-501|Y
01|146348|1|1|Includes center divider junction box subplate|Y
01|146350|2|1|Above tool is a show demo tool ran approx 15-20 hours|Y
01|146350|2|2|and has full warranty.|Y
01|146376|1|1|1st Batch|Y
01|146376|2|1|1st Batch|Y
01|146379|2|1|to hold 5/32|Y
01|146385|6|1|Please Note: Fall Promo discount of 5% has been added|Y
01|146385|6|2|to quote. If quantities change we will need to requote.|Y
01|146393|8|1|Extra 5% Fall Promo Discount Applied|Y
01|146396|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|146396|2|1|customer providing balluf chip to be installed on|Y
01|146396|2|2|holder and balanced|Y
01|146396|3|1|Coolant back-up screw and coolant tube installed|Y
01|146407|9|1|KM1.1/4-6.5 KM1.1/4 Straight Collet/Sleeve 6.5mm|Y
01|146407|13|1|Special-TL-Nikken Special|Y
01|146408|2|1|Once ordered this item cannot be returned.|Y
01|146418|3|1|Installation includes: Bulkhead cables external cables|Y
01|146418|3|2|parameter changes service time and travel.|Y
01|146418|3|3|DDR drive must be present.|Y
01|146446|1|1|Includes (2)HSK63A Pots|Y
01|146446|2|1|Includes (2)HSK63A Pots|Y
01|146446|3|1|Included with purchase of Shrink Fit Machine.|Y
01|146446|27|1|Please note that an additional 10% has been applied to|Y
01|146446|27|2|the items on this quotation per our Fall Promotion.|Y
01|146446|27|3|This 10% applies to a spend of over $5000 list price.|Y
01|146485|3|1|Included with installation package.|Y
01|146485|4|1|Included with installation package.|Y
01|146485|5|1|Installation includes: Drive unit short abr fiber opt|Y
01|146485|5|2|cable bulkhead cables external cables parameter|Y
01|146485|5|3|changes service time and travel.|Y
01|146500|5|1|Replaces GS81109|Y
01|146506|2|1|The above set has 1 missing collet 520-015 (15mm)|Y
01|146507|1|1|TAR-56162 5AX-500FA-APC SN: 1124|Y
01|146507|1|2|Tilt Axis Tool Crash - Tilt Axis needed rebuild|Y
01|146507|1|3|** special 1 time pricing **|Y
01|146511|1|1|ETA 1-2 wks|Y
01|146513|1|1|No returnable no cancellable|Y
01|146519|1|1|1st Batch|Y
01|146534|1|1|Allow 3-5 extra days for etching|Y
01|146543|1|1|BMT65-ER25-AD-ICE|Y
01|146543|1|2|Haas BMT65 ER25 LIVE Adjustable Tool ICE|Y
01|146543|1|3|Internal Coolant Supply through the spindle and|Y
01|146543|1|4|External Coolant Supply through coolant nozzles|Y
01|146543|1|5|Machine: Haas ST35Y/ DS360Y|Y
01|146571|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/4TH AXES|Y
01|146572|3|1|FRONT MOUNT SELF-CONTAINED 5C CLOSER|Y
01|146572|3|2|PRICE INCLUDES ADAPTER PLATE FOR MOUNTING|Y
01|146572|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|146581|4|1|Positioning Block for Doosan VTR Machine|Y
01|146599|3|1|16C Dead lenght front mount self contained closer.|Y
01|146599|4|1|ATL adater plate included with closer.|Y
01|146599|5|1|Includes riser plate and MT-2 center sockets|Y
01|146599|6|1|ATL collet closer actuator.|Y
01|146602|1|1|Quoted at NET pricing|Y
01|146620|2|1|Adapter included with collet closer.|Y
01|146620|5|1|Actuator for collet closer|Y
01|146620|7|1|Riser plate for tailstock .|Y
01|146627|3|1|NET pricing|Y
01|146640|2|1|This item cannot be returned once it ships.|Y
01|146648|1|1|Non-retunablenon-cancelable|Y
01|146654|2|1|Custom Positioning Block built to Machine Make/Model|Y
01|146676|1|1|Reference RGA# QUA-56246|Y
01|146676|1|2|Repair of BMT65-ER32Z s/n: 1990619004|Y
01|146676|1|3|(Mimatic# 192964)|Y
01|146676|2|1|Bearings seals and o-rings to be replaced. Please note|Y
01|146676|2|2|this is not a quality issue or any manufacturing|Y
01|146676|2|3|defects. The tool is worn out and requires normal|Y
01|146676|2|4|rebuilding including the parts above.|Y
01|146691|1|1|This is the economy headER25 Capacity|Y
01|146691|2|1|2nd 40Taper Option ER32 Capacity|Y
01|146700|17|1|Please verify|Y
01|146704|1|1|C8-SK10-120-J Polygon C8 SK10 Slim Chuck|Y
01|146704|5|1|C8-SK25-120-J  Polygon C8 SK25 Slim Chuck|Y
01|146708|1|1|Ref#: 45-48|Y
01|146712|1|1|Mimatic # 197788 CAT40 Multiple spindle output;|Y
01|146712|1|2|Int.C through spindle Ext.C through pipe;L=239mm;|Y
01|146712|1|3|1:1 Gear; max 6000 RPM; 15Nm;Ref drwg# 00058071|Y
01|146723|1|1|1st Batch|Y
01|146731|1|1|Line added to be able to close. Should have been order|Y
01|146755|1|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|146780|3|1|Winter promo discount has been added to this quote 5%.|Y
01|146781|2|1|Please Note: Discount reflects a purchase order of|Y
01|146781|2|2|two angle heads.|Y
01|146781|3|1|Please Note: Discount reflects a purchase order of|Y
01|146781|3|2|three angle heads.|Y
01|146781|4|1|Please Note: Discount reflects a purchase order of|Y
01|146781|4|2|four angle heads.|Y
01|146781|5|1|Please Note: Custom made positioning block quoted|Y
01|146781|5|2|at NET price.|Y
01|146782|7|1|INVOICE ONLY - DEMO UNIT CURRENTLY @ KINSLER|Y
01|146787|1|1|1st Batch|Y
01|146791|6|1|PLEASE NOTE THESE ITEMS ARE NON-STOCK STANDARDS|Y
01|146791|6|2|AND MAY NOT BE RETURNED.|Y
01|146818|6|1|SK16 - Colletized endmill replacement|Y
01|146818|18|1|10% discount added for 5k Price break|Y
01|146818|18|2|Promo valid through 12/30/2020|Y
01|146821|9|1|holds 0.1562 / 5/32|Y
01|146825|1|1|Without motors. 2motors will be provided by Sanritsu.|Y
01|146825|1|2|Delivery point will be at Howa Machinery (Nagoya Japan)|Y
01|146825|1|3|Free off truck at Howa's warehouse.|Y
01|146831|1|1|Without motors. 2 motors will be provided by Sanritsu.|Y
01|146831|1|2|FOB Mundelein IL. USA|Y
01|146841|1|1|Birla DHL I#202170194|Y
01|146841|1|2|NO INS Req'd.|Y
01|146841|2|1|Birla DHL I#202170194|Y
01|146841|2|2|NO INS Req'd.|N
01|146857|1|1|Ref. project CNCZ105 + PBA-105 SUB PLATE NVD 5000|Y
01|146857|1|2|S/N: 401|Y
01|146872|5|1|Please Note: The 5% extra discount has been added to|Y
01|146872|5|2|the price on this quote.|Y
01|146876|1|1|5AX-N400FA-85-500-8+1PRJ|Y
01|146876|1|2|Ref S/N 2573|Y
01|146876|1|3|Rotary joint and cables are included|Y
01|146882|3|1|Quoted at NET price.|Y
01|146882|5|1|Please Note: Extra 5% added to discount on this quote.|Y
01|146886|1|1|***Line# 1-20 Panduit Plant #1 Project***|Y
01|146886|23|1|Line# 23-28 Panduit Plant #2 Project***|Y
01|146892|1|1|ref. 112977|Y
01|146894|2|1|*NON-Returnable/ special|Y
01|146897|1|1|1st Batch|Y
01|146897|2|1|1st Batch|Y
01|146897|3|1|1st Batch|Y
01|146897|4|1|1st Batch|Y
01|146897|5|1|1st Batch|Y
01|146897|6|1|1st Batch|Y
01|146897|7|1|1st Batch|Y
01|146897|8|1|1st Batch|Y
01|146897|9|1|1st Batch|Y
01|146897|10|1|1st Batch|Y
01|146897|11|1|1st Batch|Y
01|146907|4|1|An additional 5% Discount has been applied to items on|Y
01|146907|4|2|this quotation per our Fall Promo.|Y
01|146912|3|1|Once this item is ordered it cannot be returned.|Y
01|146912|3|2|ERI holder in ERI box.|Y
01|146915|6|1|Extra 10% discount applied per Fall Promo|Y
01|146924|3|1|Promotional item free of charge|Y
01|146925|5|1|J-Nuts needed for nut swap|Y
01|146933|2|1|Machine ID chip hole/Install chip/Re-balance|Y
01|146933|5|1|Machine ID chip hole/Install chip/Re-balance|Y
01|146933|8|1|Machine ID chip hole/Install chip/Re-balance|Y
01|146933|12|1|Machine ID chip hole/Install chip/Re-balance|Y
01|146933|14|1|Machine ID chip hole/Install chip/Re-balance|Y
01|146933|17|1|Machine ID chip hole/Install chip/Re-balance|Y
01|146933|20|1|Machine ID chip hole/Install chip/Re-balance|Y
01|146933|23|1|Machine ID chip hole/Install chip/Re-balance|Y
01|146934|6|1|Extra 5% discount applied per Fall Promo|Y
01|146942|6|1|Extra 10% discount applied per Fall Promo|Y
01|146947|1|1|3pc/1 set of Master Jaws for H01MA15 R-1772 chuck|Y
01|146949|58|1|Discount reflective of 5K -10% price break|Y
01|146950|5|1|Pancake Cylinder 4MT style HYD.|Y
01|146950|6|1|Actuates all 4 closers at same time.|Y
01|146950|7|1|Pancake Cylinders.|Y
01|146954|1|1|Reference RGA# QUA-56188|Y
01|146954|1|2|Repair of MNZ20-SK20X-ICE-12K s/n: 1990389802|Y
01|146954|1|3|(Mimatic# 190667)|Y
01|146959|1|1|with J-Nut: SKN-20BJ|Y
01|146967|3|1|INSTALLATION WILL INCLUDE ALL ITEMS NEEDED TO|Y
01|146967|3|2|MAKE THE TABLE OPERATE INCLUDING DRIVES WIRING ETC.|Y
01|146974|3|1|4 Squrae x 16 Tombstone flat and square within .001|Y
01|146974|3|2|Includes 1 Thick steel sub plates for Doosan DNM5700|Y
01|146984|3|1|Installation kit includes: dual axis drive unit short|Y
01|146984|3|2|bar fiber optic cables communication cables bulk|Y
01|146984|3|3|head cable set & external cables.|Y
01|146984|4|1|Installation includes: drive unit short bar fiber|Y
01|146984|4|2|optic cables communication cables bulk head cable|Y
01|146984|4|3|set external cable set parameter changes service|Y
01|146984|4|4|time and travel.|Y
01|146986|3|1|4.5 Riser for rotary table|Y
01|146986|4|1|Installation includes: drive unit short bar fiber|Y
01|146986|4|2|optic cables communication cables bulk head cable|Y
01|146986|4|3|set external cable set parameter changes service|Y
01|146986|4|4|time and travel.|Y
01|146989|1|1|If ordered before 12/4 ETA end of December.|Y
01|146989|1|2|If ordered after 12/4 ETA end of January.|Y
01|146994|5|1|Note: An additional 10% discount has been applied to|Y
01|146994|5|2|the items on this quotation per our Fall Promo.|Y
01|146996|10|1|An additional 10% discount has already been applied to|Y
01|146996|10|2|the items on this quotation per our Fall Promo.|Y
01|147005|6|1|Fall Promo 10% discount added to items quoted.|Y
01|147023|1|1|Tool Certificate #19992-2429-092419|Y
01|147024|6|1|***USED TOOL- DEMO AT LYN***|Y
01|147024|6|2|***Cannot be cancelled or returned***|Y
01|147028|1|1|TOOL NUMBERS: 1 2 3 11 12 21 23 41|Y
01|147028|2|1|TOOL NUMBERS: 4 5 13 40 45|Y
01|147028|3|1|TOOL NUMBERS: 14 22 26|Y
01|147028|4|1|TOOL NUMBERS: 16 50|Y
01|147028|5|1|TOOL NUMBERS: 17 24 30 47 48|Y
01|147028|6|1|TOOL NUMBER 22|Y
01|147028|7|1|TOOL NUMBERS: 27 28 42|Y
01|147028|8|1|TOOL NUMBERS: 44 46|Y
01|147029|1|1|STANDARD ANGLE HEAD|Y
01|147029|2|1|TWIN SPINDLE ANGLE HEAD|Y
01|147029|3|1|OFFSET SLIM TYPE ANGLE HEAD|Y
01|147029|7|1|EXTRA 10% GIVEN; LIST PRICE OVER $5000|Y
01|147030|4|1|5% promo added to discount.|Y
01|147035|4|1|Additional promo discount applies to total quoted.|Y
01|147047|7|1|10ft of wiring included|Y
01|147060|5|1|Promo applies to total amount quoted.|Y
01|147086|3|1|Extra 10% dicount added per Fall Promo|Y
01|147088|3|1|Extra 10% dicount added per Fall Promo|Y
01|147099|2|1|Wrench is required.Please check if your customer has|Y
01|147111|6|1|5% extra has been added to discount on this quote|Y
01|147111|6|2|as Winter Promo.|Y
01|147113|5|1|Installation includes: Dual axis drive unti short bar|Y
01|147113|5|2|fiber optic cables communications cables bulkhead|Y
01|147113|5|3|cables external cables parameter changes service|Y
01|147113|5|4|time and travel.|Y
01|147114|1|1|2 stock ship 1 week 8 ship 3-4wks bal 90 days + ship|Y
01|147114|2|1|5 6-7 wks bal 90 days mfg + 1-2wks to ship|Y
01|147115|1|1|Req.INS/866704 ApTex/Frentzel|Y
01|147115|2|1|Req.INS/860988 PumpWorks|Y
01|147129|1|1|1 PC ETA 3 WKS Balance ETA 13-14 WKS|Y
01|147129|1|2|Qouted as NET pricingnon-returnablenon-cancelable|Y
01|147129|2|1|1 PC ETA 3 WKS Balance ETA 13-14 WKS|Y
01|147129|2|2|Qouted as NET pricingnon-returnablenon-cancelable|Y
01|147130|1|1|Repair Quote for TAT-105 SN 9010 TAR-56326|Y
01|147132|1|1|Repair Quote for CNCZ202LYA-BR SN: 6021|Y
01|147132|1|2|TAR-56326|Y
01|147135|1|1|Ref. S#30345TC|Y
01|147139|2|1|An additional 5% discount has been applied to this|Y
01|147139|2|2|item per our Fall Promo.|Y
01|147141|1|1|1 PC Pricing|Y
01|147141|3|1|2 PC pricing|Y
01|147149|1|1|Price match to prior quote 144256repeat business|Y
01|147150|4|1|Replacement for FK-6|Y
01|147150|6|1|Replacement for FK-8|Y
01|147155|1|1|Reference RGA# TOR-56287|Y
01|147155|1|2|Repair of CAT50U-AHC1.1/4-210-90 s/n: AHG-08213|Y
01|147169|1|1|Delivery: 1-PC ETA to L-N 12/11 >>Bal pending will|Y
01|147169|1|2|advise shortly.|Y
01|147181|4|1|10% ADDITIONAL DISCOUNT FROM PROMO|Y
01|147190|1|1|Reference RGA# TOR-56344|Y
01|147190|1|2|Repair of CAT40-NPU8-80U-IDU|Y
01|147190|5|1|Repair of CAT40-NPU8-80U-IDU|Y
01|147190|9|1|Repair of CAT40-NPU8-110U-IDU|Y
01|147201|1|1|MODIFICATION-DSCREW-THREAD|Y
01|147204|4|1|this is the set with the center sheet metal piece|Y
01|147204|5|1|Delivery 10 weeks ARO|Y
01|147209|1|1|Qualifies for 5% promo Price Break|Y
01|147209|5|1|Qualifies for 5% promo Price Break|Y
01|147209|9|1|Qualifies for 10% promo Price Break|Y
01|147221|1|1|Reference RGA# LVR-56259|Y
01|147221|1|2|Repair of NK103-12000 s/n: AL0019 (Alps# NK103-12000)|Y
01|147221|2|1|Bearingso-rings collet nut and spindle to be replaced|Y
01|147236|3|1|EXTRA 5% DISCOUNT FROM FALL PROMOTION|Y
01|147237|1|1|Tool Certificate #25000-2737-0902220RT|Y
01|147237|2|1|Replaces NCAT40-SK20-50U-IDU being returned on #56351|Y
01|147242|1|1|Ref. S#30345TC|Y
01|147245|9|1|Milling Chuck|Y
01|147245|10|1|NET PRICE-NO ADDITIONAL DISCOUNT|Y
01|147245|19|1|Extra 10% discount added to standard items per promo|Y
01|147252|1|1|Repair Quote for CNCZ180LYA-BR SN: 7019|Y
01|147252|1|2|TAR-56326|Y
01|147253|1|1|Repair Quote for TAT-105 SN 9010 TAR-56326|Y
01|147264|1|1|1st Batch|Y
01|147270|17|1|***Part#NT05-006 Desc:#1 PosiDrv Rigid Tap Collet B/O|Y
01|147270|17|2|***ALT: PART#NT05-006(S) (SLOTTED)***|Y
01|147270|22|1|***ALTERNATE OPTION***|Y
01|147284|2|1|Fall promo 5% added to discount.|Y
01|147286|3|1|Fall Promo 5% added to discount on this quote.|Y
01|147286|3|2|Promotion ends December 30th.|Y
01|147303|2|1|50 stock 50 ETA 12/20 50 ETA 1/30|Y
01|147307|1|1|Reference RGA# LVR-56315|Y
01|147307|1|2|Repair of BMT65-ER32Z s/n: 19901340 07 (Mimatic#192964)|Y
01|147307|2|1|Bearings seals o-rings to be replaced. Recondition|Y
01|147307|2|2|1 x output spindle|Y
01|147313|1|1|Cable set from table to bulkhead|Y
01|147327|1|1|Ref. 45-48|Y
01|147336|26|1|FALL PROMO PRICING EXPIRES 12/30/2020|Y
01|147350|9|1|Promo 10% has been included with discount quoted.|Y
01|147356|2|1|PRESETTER COMES WITH CAT50 SPINDLE|Y
01|147356|5|1|CAPTO C4 PRESETTER SPINDLE|Y
01|147356|6|1|CAPTO C6 PRESETTER SPINDLE|Y
01|147356|7|1|CAPTO C8 PRESETTER SPINDLE|Y
01|147356|8|1|HSK63A PRESETTER SPINDLE|Y
01|147356|21|1|PRESETTER INSTALLATION @ 2 FULL DAYS OF TRAINING|Y
01|147356|21|2|INCLUDED AT NO ADDITIONAL COST|Y
01|147356|23|1|10% ADDITIONAL DISCOUNT - FALL PROMO|Y
01|147357|2|1|INCLUDES 50 TAPER SPINDLE|Y
01|147357|2|2|INCLUDES 8 SEATS OF TP32 TOOL MANAGEMENT|Y
01|147357|5|1|CAPTO C4 PRESETTER SPINDLE|Y
01|147357|6|1|CAPTO C6 PRESETTER SPINDLE|Y
01|147357|7|1|CAPTO C8 PRESETTER SPINDLE|Y
01|147357|8|1|HSK63A PRESETTER SPINDLE|Y
01|147357|21|1|PRESETTER INSTALLATION & 2 FULL DAYS OF TRAINING|Y
01|147357|21|2|INCLUDED AT NO ADDITIONAL COST|Y
01|147357|22|1|2 FULL DAYS OF TRAINING AT A LATER TIME WITHIN|Y
01|147357|22|2|6 MONTHS OF ORIGINAL INSTALLATION AT NO CHARGE|Y
01|147360|1|1|CROSS FROM KENNAMETAL 6694001|Y
01|147360|2|1|CROSS FROM ACCUPRO 70894381|Y
01|147360|3|1|CROSS FROM ACCUPRO 70894399|Y
01|147360|5|1|CROSS FROM KENNAMETAL 6694002|Y
01|147360|6|1|CROSS FROM ERICKSON 2269976|Y
01|147360|7|1|CROSS FROM ERICKSON 1126252|Y
01|147360|9|1|CROSS FROM SECO 03201525|Y
01|147360|10|1|CROSS FROM SECO 03201529|Y
01|147360|11|1|CROSS FROM COLLINS TOOL 75055|Y
01|147360|13|1|FALL PROMO EXTRA 10% FOR OVER $5000 LIST PRICE|Y
01|147362|4|1|An additional 10% discount has been applied to these|Y
01|147362|4|2|items per our Fall Promo. Thank you!|Y
01|147380|5|1|Installation includes:Dual axis drive unit short bar|Y
01|147380|5|2|fiber optic cables communications cables bulkhead|Y
01|147380|5|3|cables external cablesparameter changes service|Y
01|147380|5|4|time and travel.|Y
01|147383|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147383|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147383|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147419|1|1|NCAT40-SF8-120 2LK TaperPlus NCAT40 8mm Shrink Fit|Y
01|147419|1|2|Holder|Y
01|147419|3|1|NCAT40-SF8-120 2LK TaperPlus NCAT40 8mm Shrink Fit|Y
01|147419|3|2|holder|Y
01|147419|5|1|NCAT40-SF8-120 2LK TaperPlus NCAT40 8mm Shrink Fit|Y
01|147419|5|2|holder|Y
01|147429|6|1|#30-TB40-300 : #30 Test Bar 40x300mm No Flange style|Y
01|147429|6|2|Special Order. Unit Price Each|Y
01|147429|8|1|BT30-TB40-300 : BT30 Test Bar 40x300mm|Y
01|147430|2|1|Chip Hole Chip Install & Rebalance|Y
01|147438|8|1|10% ADDITIONAL DISCOUNT FROM FALL HARDWORK PROMO|Y
01|147440|3|1|Lyndex-Nikken to make position block based on|Y
01|147440|3|2|provide spindle drawing from customer|Y
01|147440|3|3|*NET|Y
01|147444|10|1|Promo applies to total amount quoted.|Y
01|147454|3|1|Installation includes: Dual axis drive unit short bar|Y
01|147454|3|2|fiber optic cable communications cable bulkhead head|Y
01|147454|3|3|cables external cables parameter changes service|Y
01|147454|3|4|time and travel.|Y
01|147471|2|1|An additional 5% discount has been applied per our Fall|Y
01|147471|2|2|Promotion! Thank you!|Y
01|147477|2|1|Includes adapter plate|Y
01|147477|3|1|Includes riser plate|Y
01|147477|5|1|Installation includes: Drive unit short bar fiber|Y
01|147477|5|2|optic cable communications cable bulkhead cables|Y
01|147477|5|3|parameter changes service time and travel.|Y
01|147481|2|1|*Lyndex-Nikken to make position block upon receipt of|Y
01|147481|2|2|spindle drawing information from customer|Y
01|147486|3|1|Promo 5% has been added to the discount. Order must|Y
01|147486|3|2|be $500.00 list to keep extra discount.|Y
01|147491|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147491|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147491|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147491|5|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147491|6|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147491|7|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147491|8|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147491|9|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147491|10|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147491|11|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147504|5|1|Promo discount based on total amount quoted.|Y
01|147512|47|1|Part # AX121R044|Y
01|147525|1|1|Special year end bulk package price|Y
01|147525|2|1|Special year end bulk package price.|Y
01|147540|1|1|1st Batch/Back to WH1 after INS|Y
01|147540|2|1|1st Batch/Back to WH1 after INS|Y
01|147544|1|1|4 riser to increase tilt angle to 0-141 degrees|Y
01|147545|2|1|Quoted at NET price.|Y
01|147550|2|1|Quoted at NET price.|Y
01|147562|1|1|Reference RGA# LVR-56285|Y
01|147562|1|2|Repair of OKL3-ER32Z-OFMS s/n: Unknown|Y
01|147562|1|3|(Alps# OK109-15001)|Y
01|147562|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|147562|2|2|replaced.|Y
01|147578|1|1|CNCZ202FA w/o Motor or Rotary Joint|Y
01|147593|1|1|***PTSolutions Standard Discount 25% Off List.|Y
01|147593|1|2|10% Fall Promo included***|Y
01|147593|4|1|***PTSolutions Standard Discount 25% Off List.|Y
01|147593|4|2|10% Fall Promo included***|Y
01|147595|4|1|An additional 5% discount has been applied to the items|Y
01|147595|4|2|on this quotation per our Fall Promo.|Y
01|147608|1|1|1st Batch|Y
01|147608|2|1|1st Batch|Y
01|147608|3|1|1st Batch|Y
01|147608|4|1|1st Batch|Y
01|147608|5|1|1st Batch|Y
01|147608|6|1|1st Batch|Y
01|147608|7|1|1st Batch|Y
01|147608|8|1|1st Batch|Y
01|147608|9|1|1st Batch|Y
01|147608|10|1|1st Batch|Y
01|147608|11|1|1st Batch/SP|Y
01|147608|12|1|1st Batch/SP GKN-NY|Y
01|147608|13|1|1st Batch/SP GKN-NY|Y
01|147608|14|1|1st Batch/SP GKN-NY|Y
01|147608|15|1|1st Batch/SP GKN-NY|Y
01|147608|16|1|1st Batch/SP GKN-NY|Y
01|147608|17|1|1st Batch/SP GKN-NY|Y
01|147608|18|1|1st Batch/SP GKN-NY|Y
01|147608|19|1|1st Batch/SP GKN-NY|Y
01|147608|20|1|1st Batch/SP GKN-NY|Y
01|147608|21|1|1st Batch/SP GKN-NY|Y
01|147608|22|1|Req. INS/SP GKN-NY|Y
01|147622|1|1|Weight is 11-lbs.|Y
01|147622|2|1|Promo 5% added to discount on this quote.|Y
01|147628|1|1|Training includes: Operational training point|Y
01|147628|1|2|aquisition training and trouble shooting.|Y
01|147628|1|3|Training block 40hrs|Y
01|147628|2|1|Installation service time and travel.|Y
01|147628|3|1|HMI modification in MN|Y
01|147661|6|1|New part # replaces C4016-0500-4.00|Y
01|147661|7|1|New part # replacing C4017-0025-2.50|Y
01|147661|17|1|Extra 10% discount applied for Fall Promo|Y
01|147661|17|2|Order placed must remain > 5K list to be retain disc|Y
01|147675|6|1|An additional 5% discount has been added to the items|Y
01|147675|6|2|on this quotation per our Fall Promo.|Y
01|147685|3|1|REPAIR QUOTE CNCZ180LYA-BR SN: 20161|Y
01|147685|3|2|TAR-56288|Y
01|147686|3|1|REPAIR QUOTE CNCZ180LYA-BR SN: 20158|Y
01|147686|3|2|TAR-56288|Y
01|147686|3|3|** IF REPAIR REQUESTED WILL NOT GUARENTEE FACTORY|Y
01|147686|3|4|SPECIFICATIONS DUE TO DAMAGE TO CASTING/SPINDLE **|Y
01|147691|2|1|Not for Erickson Quick Change|Y
01|147697|2|1|BT50-C20-220|Y
01|147697|2|2|Nikken BT50 20mm Milling Chuck w/ 220mm gl|Y
01|147697|2|3|**Special - Non-returnable/Non-cancellable|Y
01|147706|1|1|820-005   ETA 1/22   820-007  ETA 1/22|Y
01|147724|4|1|Non-returnablenon-cancelable|Y
01|147731|1|1|Tooling Certificate Number:  E20540-2795-110620|Y
01|147737|19|1|10% discount added for Promo ending on 12/30/2020|Y
01|147737|19|2|Discount break level 5K and over|Y
01|147764|7|1|Alternative to NCAT40-SK10C-180U-IDU|Y
01|147777|7|1|Extra 5% discount applied per Promo.To qualify the|Y
01|147777|7|2|order placed must exceed $500 List Price|Y
01|147778|1|1|NC260OSP4-M|N
01|147779|3|1|PPA-110 Custom Pnumatic Tailstock|Y
01|147779|3|2|Morse Taper #2|Y
01|147779|4|1|Tail Stock Sub Plate|Y
01|147779|7|1|Includes: Parameter changes service time & travel|Y
01|147785|18|1|Coolant Collet Option|Y
01|147785|32|1|10% discount added for Promo ending on 12/30/2020.|Y
01|147794|4|1|Discount applies to total of quote|Y
01|147796|1|1|Air Brake|Y
01|147821|1|1|Discount reflects SO#866537/S2490852 replacment|Y
01|147824|1|1|Modification from angle head part# 135164 to 178156 by|Y
01|147824|1|2|replaceing flange/pin assembly.|Y
01|147836|1|1|Quoted at net pricing.|Y
01|147837|4|1|Extra 5% Promo discount awarded.Order place must be|Y
01|147837|4|2|over $500 List price|Y
01|147864|4|1|5% discount added for Promo ending on 12/30/2020.|Y
01|147875|3|1|5% promo added to the discount expires 12/30/2020.|Y
01|147876|3|1|An additional 10% discount has been applied per our|Y
01|147876|3|2|Fall Promo.|Y
01|147877|3|1|HSK63A-MDSK16-135P|Y
01|147877|3|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|147881|2|1|Installation includes: drive unit short bar fiber|Y
01|147881|2|2|optic cables communication cables bulk head cable|Y
01|147881|2|3|set external cable set parameter changes service|Y
01|147881|2|4|time and travel.|Y
01|147893|2|1|Promo 5% added to discount on this quote.|Y
01|147911|2|1|One table only with sheet metal divider junction box|Y
01|147911|2|2|main cable set cabinet cablesdrive units.|Y
01|147923|1|1|INCLUDES TWIN SPINDLE ROTARY TABLE WITH HAAS MOTOR|Y
01|147923|1|2|AND CABLE SET.|Y
01|147923|5|1|COST IS NET TO HFO|Y
01|147923|5|2|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|147923|5|3|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|147923|5|4|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|147923|5|5|TRAVEL.|Y
01|147924|4|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|147924|4|2|of customer's spindle drawing information.|Y
01|147937|2|1|Installation kit|Y
01|147955|1|1|Mark with P&W part# CS865-191|Y
01|147955|2|1|Wesco to verify>P&W part# CS865-191 marked om holder|Y
01|147956|1|1|25MM Hex .675 OAL 1.098 Dia M22x1.5|Y
01|147956|1|2|THREAD STYLE:SOLID|Y
01|147956|2|1|D32 L17.5 M22xP1.5 WRENCH 016-SPAN|Y
01|147956|2|2|Used on Standard ER Collet Chuck Style: Bearing|Y
01|147956|3|1|Wrench for the E16-NUT|Y
01|147962|4|1|BT30 22mm Pilot Shell Mill Holder w/ 85mm projection|Y
01|147962|4|2|Coolant: DIN Flange|Y
01|147962|4|3|Part# B3001-22-85DIN|Y
01|147962|4|4|**Min. Qty: 3pcs|Y
01|147963|1|1|Reference RGA# TOR-56266|Y
01|147963|1|2|Repair of PRE-PART-05PAN|Y
01|147981|6|1|Additional 5% discount has been added to each item.|Y
01|147981|6|2|Discount applies to total amount quoted.|Y
01|147986|4|1|Installation/training - total of 8 hours|Y
01|147986|9|1|Installation/training - total of 8 hours|Y
01|148017|1|1|1st Batch|Y
01|148019|4|1|An additional 10% has been added to this item per our|Y
01|148019|4|2|Fall Promo. This is due to Expire 12/31/2020.|Y
01|148030|1|1|Tool Certificate #25000-2325-052819RT|Y
01|148034|1|1|1st Batch|Y
01|148041|1|1|CAT50-SK10-55UP CAT50 SK10 Slim Chuck ID chip hole|Y
01|148041|1|2|High Speed|Y
01|148041|1|3|Quoted at NET price|Y
01|148041|3|1|CAT50-SK16-55UP CAT50 SK16 Slim Chuck ID chip hole|Y
01|148041|3|2|High Speed|Y
01|148041|3|3|Quoted at NET price|Y
01|148041|5|1|CAT50-SK25-55UP CAT50 SK25 Slim Chuck ID chip hole|Y
01|148041|5|2|High Speed|Y
01|148041|5|3|Quoted at NET price|Y
01|148045|1|1|10000 RPM External Coolant Only|Y
01|148045|2|1|10000 RPM Internal and External Coolant AND can run|Y
01|148045|2|2|dry 24/7.|Y
01|148045|5|1|10000 RPM external Coolant Only.|Y
01|148048|2|1|Installation kit|Y
01|148048|5|1|** $1k tooling certificate|Y
01|148065|4|1|NBT40-MDMS4S-90|Y
01|148065|5|1|NBT40-MSDMS4S-115|Y
01|148065|6|1|NBT40-MDMS6S-90|Y
01|148065|7|1|NBT40-MDMS6S-115|Y
01|148065|8|1|NBT40-MDMS12S-90|Y
01|148065|9|1|NBT40-MDMS12S-115|Y
01|148084|29|1|MACHINED to 25MM for ER16|Y
01|148084|29|2|******MODIFIED BY TIM BEFORE SHIPPING****|Y
01|148090|1|1|P/N: BMT65-ER40X   197183|Y
01|148090|1|2|BMT65 LIVE ER40 STR; 1:1 Gear; 70Nm; Ext Coolant|Y
01|148090|1|3|10000 RPM; GL= 71mm|Y
01|148091|51|1|Quoted instead of -75. 75 is a special with higher cost|Y
01|148099|13|1|Entire non-coolant set for tools above.|Y
01|148101|4|1|Promo 10% added to discount on this quote.|N
01|148104|4|1|MZST68-ER40Z|Y
01|148110|6|1|Promo 5% added to discount on this quote.|Y
01|148112|1|1|Non-returnablenon-cancelable|Y
01|148112|2|1|Non-returnablenon-cancelable|Y
01|148133|19|1|10% discount added for Promo ending on 12/30/2020|Y
01|148133|19|2|Discount break level 5K and over|Y
01|148138|9|1|5% - $500 price break reached for promo|Y
01|148138|9|2|Ending 12/30/2020|Y
01|148142|7|1|with High Speed Nut #SKN-16B(GH)|Y
01|148146|1|1|MNL12-ER32Z-MS-ICE-10K|Y
01|148146|1|2|NO QUOTE|Y
01|148147|1|1|TC#|Y
01|148156|7|1|An additional 5% discount has been applied to these|Y
01|148156|7|2|items per our Fall Promo.|Y
01|148159|14|1|Promo discount 10% has been added to the discount on|N
01|148159|14|2|on this quote. Order minimum for the extra 10% must be|N
01|148159|14|3|$5000.00 list.|N
01|148170|1|1|Includes: Sigma5 motor external cables air kit|Y
01|148173|17|1|Additional discount applies to total amount quoted.|Y
01|148178|2|1|OKLT-BGC4-C|Y
01|148178|2|2|OKUMA STATIC Capto C4 Boring Bar IC|Y
01|148178|5|1|OKLT-CAPTO4Z-MS|Y
01|148178|5|2|OKUMA 90DEG LIVE  Capto C4 Axial /Face Driven Tool ExtC|Y
01|148178|8|1|OKLT-CAPTO4X-ICE|Y
01|148178|8|2|OKUMA 90DEG LIVE Capto C4 Radial/Cross Tool Int/ExtC -|Y
01|148178|8|3|ICE|Y
01|148189|1|1|NBT40-CZF25-120|Y
01|148189|1|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|148189|2|1|NBT40-CZF32-120|Y
01|148189|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|148198|20|1|Please note an additional 10% discount has been applied|Y
01|148198|20|2|to this quotation per our Fall Promo.|Y
01|148200|17|1|Please note that an additional 5% discount has been|Y
01|148200|17|2|applied to this quote per our Fall Promo.|Y
01|148213|4|1|Modification charge at net price|Y
01|148213|4|2|Balance rating 15000 RPM at G2.5|Y
01|148213|4|3|Modification of customer material|Y
01|148213|4|4|Shipping cost not included|Y
01|148226|1|1|BEARING NUT|Y
01|148226|2|1|SOLID/NON-BEARING NUT|Y
01|148256|1|1|HSK50-PLUG|Y
01|148261|1|1|Repair Quote 5AX-130 SN: 5475|Y
01|148261|1|2|TAR-56405|Y
01|148261|1|3|Table had a machine crash coolant inside full rebuild|Y
01|148272|1|1|Tool Certificate #25000-2778-100920|Y
01|148274|1|1|List Price is $50470.00|Y
01|148274|1|2|Delivery : Ships 2 to 3 weeks ARO|Y
01|148278|4|1|MI40-ER25|Y
01|148295|14|1|Extra 10% discount given per Promo.Order placed must|Y
01|148295|14|2|exceed $5K list price|Y
01|148310|1|1|1st Batch|Y
01|148310|2|1|1st Batch|Y
01|148310|3|1|1st Batch|Y
01|148310|4|1|1st Batch|Y
01|148310|5|1|1st Batch|Y
01|148310|6|1|1st Batch|Y
01|148310|7|1|1st Batch|Y
01|148310|8|1|1st Batch|Y
01|148313|24|1|Please note an additional 5% discount has been applied|Y
01|148313|24|2|to this quotation per our Fall Promo.|Y
01|148326|8|1|An additional 5% discount has been applied per our|Y
01|148326|8|2|Fall Promotion.|Y
01|148330|24|1|Comes with CN403R011 & CN403R012|Y
01|148330|24|2|Must be Ordered Together|Y
01|148336|1|1|1st Batch|Y
01|148336|2|1|1st Batch|Y
01|148337|1|1|1st Batch/For stock 7/10/20:DWG Approved.|Y
01|148337|2|1|1st Batch|Y
01|148337|3|1|1st Batch|Y
01|148339|1|1|1st Batch/For stock 10/13/20:DWG Approved.|Y
01|148343|5|1|An extra 5% has been added to your discount for this|Y
01|148343|5|2|quote >>Fall Promo.|Y
01|148346|1|1|2345678910mm|Y
01|148346|2|1|44.555.566.577.588.599.510mm|Y
01|148355|14|1|Extra 10% discount given per Promo.Order placed must|Y
01|148355|14|2|exceed $5K list price|Y
01|148358|1|1|Customer has declined the repairs/replacements of 4 x|Y
01|148358|1|2|HSK63A-MMC8C-115-AA 2 x HSK63A-NPU13C-135 1 x|Y
01|148358|1|3|CAT40-C1.1/4-105U and 1 x HSK63A-C1.1/4-110|Y
01|148358|1|4|All tools will be scrapped in house per Chris.|Y
01|148368|1|1|HSK63A-TC0562-4.92|Y
01|148368|1|2|HSK63A #1 Tension/Compression Tap Holder|Y
01|148372|2|1|This item is considered speical once it's ordered it|Y
01|148372|2|2|cannot be returned.|Y
01|148372|3|1|This item is considered speical once it's ordered it|Y
01|148372|3|2|cannot be returned|Y
01|148379|3|1|Extra 5% discount added per promo|Y
01|148385|3|1|Delivery - Ship 4weeks A.R.O|Y
01|148404|1|1|Balance TBD|Y
01|148409|3|1|Net Price includes Balluff chip BIS-C-122-04/L and|Y
01|148409|3|2|installation for each holder. We will laser mark|Y
01|148409|3|3|the toolholders at no charge #CS-027-090-003.|Y
01|148409|8|1|Fall promo 5% included in discount quoted.|Y
01|148438|2|1|Once ordered this item cannot be returned. *HOT DEAL*|Y
01|148438|4|1|Once ordered this item cannot be returned. *HOT DEAL*|Y
01|148447|2|1|Please note: I added the extra 5% to the discount for|Y
01|148447|2|2|the promo.|Y
01|148453|1|1|Use a Fanuc A8iS Motor.|Y
01|148453|4|1|Servo Amp A068-6160-H004 supplied by Ellison Tech.|Y
01|148455|2|1|Quoted at Net Price. Delivery is based upon a purchase|Y
01|148455|2|2|order after our technical department speaks to end user|Y
01|148455|2|3|for machine information.|Y
01|148455|4|1|Fall promo 5% has been added to your discount.|Y
01|148457|2|1|Once ordered this item cannot be returned. *HOT DEAL*|Y
01|148457|4|1|Once ordered this item cannot be returned. *HOT DEAL*|Y
01|148460|2|1|Once ordered this item cannot be returned. *HOT DEAL*|Y
01|148460|4|1|Once ordered this item cannot be returned. *HOT DEAL*|Y
01|148465|15|1|Promo 5% has been added to your discount.|Y
01|148468|1|1|Please Note: SKN-6WB(GH) has been replaced with|Y
01|148468|1|2|SKN-6WK(GH). This is the same nut but new and improved.|Y
01|148479|1|1|Tooling Certificate Number: E13625-981-060117|Y
01|148489|1|1|HSK63A 8mm Shrink Fit Holder Pre-Balanced 25000 w/ID|Y
01|148489|1|2|Chip BIS-C-122-04/L Installed 80mm gage length coolant|Y
01|148489|1|3|thru. Part # H63A-SF8-80-IDI|Y
01|148489|2|1|HSK63A 6mm Shrink Fit Holder Pre-Balanced 25000 w/ID|Y
01|148489|2|2|Chip BIS-C-122-04/L Installed 80mm gage length coolant|Y
01|148489|2|3|thru. Part # H63A-SF6-80-IDI|Y
01|148489|3|1|HSK63A 6mm Shrink Fit Holder Pre-Balanced 25000 w/ID|Y
01|148489|3|2|Chip BIS-C-122-04/L Installed 130mm gage length coolant|Y
01|148489|3|3|thru. Part # H63A-SF6-130-IDI|Y
01|148489|4|1|HSK63A 14mm Shrink Fit Holder Pre-Balanced 25000 w/ID|Y
01|148489|4|2|Chip BIS-C-122-04/L Installed 90mm gage length coolant|Y
01|148489|4|3|thru. Part # H63A-SF14-90-IDI|Y
01|148489|5|1|HSK63A 14mm Shrink Fit Holder Pre-Balanced 25000 w/ID|Y
01|148489|5|2|Chip BIS-C-122-04/L Installed 75mm gage length coolant|Y
01|148489|5|3|thru. Part # H63A-SF14-75-IDI|Y
01|148489|6|1|HSK63A 10mm Shrink Fit Holder Pre-Balanced 25000 w/ID|Y
01|148489|6|2|Chip BIS-C-122-04/L Installed 70mm gage length coolant|Y
01|148489|6|3|thru.Part # H63A-SF10-70-IDI|Y
01|148489|7|1|HSK63A 12mm Shrink Fit Holder Pre-Balanced 25000 w/ID|Y
01|148489|7|2|Chip BIS-C-122-04/L Installed 70mm gage length coolant|Y
01|148489|7|3|thru. Part # H63A-SF12-70-IDI|Y
01|148489|8|1|HSK63A 12mmShrink Fit Holder Pre-Balanced 25000 w/ID|Y
01|148489|8|2|Chip BIS-C-122-04/L Installed 70mm gage length coolant|Y
01|148489|8|3|thru. Part # H63A-SF12-70-IDI|Y
01|148493|1|1|1st Batch|Y
01|148493|4|1|1st Batch|Y
01|148493|5|1|1st Batch|Y
01|148506|1|1|Clear Sight Glass Window CNCB450TFA|Y
01|148509|5|1|Fall promo 5% added to discount on this quote.|Y
01|148509|5|2|Thank you!!|Y
01|148521|4|1|An additional 10% discount has been applied to this|Y
01|148521|4|2|quote per our Winter Promo.|Y
01|148537|2|1|P/N: N40-J4|Y
01|148537|2|2|THIS IS NO QUOTE|Y
01|148537|2|3|Nikken does not have JT4 taper gauge|Y
01|148547|4|1|Fall Promo 5% has been added to your discount on this|Y
01|148547|4|2|quote. Thank you!!|Y
01|148551|1|1|ER16 Discontinued by Mimatic replaced with ER25 quoted|Y
01|148551|1|2|MZMP46-ER25-AD-ICE-H2 Mimatic part # 192556|N
01|148555|2|1|Net Price includes Balluff chip BIS-C-122-04/L and|Y
01|148555|2|2|installation for each holder. We will laser mark|Y
01|148555|2|3|the toolholders at no charge #CS-027-090-003.|Y
01|148598|1|1|200MM tilt rotary table with Haas motors and cables|Y
01|148605|21|1|***Torque Wrench Body Can be used with line#'s 18&20***|Y
01|148605|21|2|***For ER32 & ER25 Taper Plus Holders***|Y
01|148616|1|1|2-105MM High Speed tables with sheet metal package and|Y
01|148616|1|2|electronics.|Y
01|148633|4|1|Installation includes: drive unit short bar fiber|Y
01|148633|4|2|optic cables communication cables bulk head cable|Y
01|148633|4|3|set external cable set parameter changes service|Y
01|148633|4|4|time and travel.|Y
01|148641|1|1|Includes: Sigma5 motor external cables air kit|Y
01|148647|23|1|ETA 3 weeks|Y
01|148647|66|1|Extra 5% per promo|Y
01|148653|3|1|OKL4-ER40X-ICE|Y
01|148653|3|2|Okuma Live X-axis 90deg ER40  <SIDE> with ICE Coolant|Y
01|148653|3|3|Internal and External Coolant|Y
01|148653|3|4|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|148661|1|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|2|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|3|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|4|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|5|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|6|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|7|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|8|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|9|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|10|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|11|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|12|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|13|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148661|14|1|INS:RGA#56381/RPLC for 865623/PTS/AWTX D.T4-16BNG|Y
01|148663|1|1|Repair of 5AX-130YA-M SN:5953|Y
01|148663|1|2|Rotary Table sustained crash Tilt axis needs rebuilt|Y
01|148663|17|1|Cost of Labor/Travel/Hotel/Flight/Meals|Y
01|148680|4|1|5% ADDITIONAL DISCOUNT PROMO OVER $500 LIST PRICE|Y
01|148690|2|1|*alt for B30S7-0020-1.22|Y
01|148690|15|1|2 gl|Y
01|148696|1|1|Test tooling is non-refundable|Y
01|148709|1|1|If ordered by 1/12 ETA is 1/20. If ordered after 1/12|Y
01|148709|1|2|and before 2/1 the ETA will be 2/10 week|Y
01|148710|7|1|10ft of wiring included|Y
01|148717|1|1|MBT40-C20-90S-RP|Y
01|148717|3|2|MBT40-C32-105S-RP|Y
01|148717|5|1|MBT40-SK10C-200ST-RP|Y
01|148717|5|2|Straight body|Y
01|148717|12|1|New Gen: Taper Plus|Y
01|148720|1|1|5AX-2MT-225-304.8|Y
01|148720|1|2|Sent in for repair|Y
01|148720|1|3|Tilt axis has major damage from Tool Crash|Y
01|148720|1|4|Rotary Axis also has damage and needs rebuild|Y
01|148727|1|1|HFO TO SUPPLY SERVO MOTORS AND CABLES LYNDEX NIKKEN TO|Y
01|148727|1|2|Install|Y
01|148730|1|1|Reference RGA# QUA-56421|Y
01|148730|1|2|Repair of MNZ20-ER25Z s/n: A0984 (Alps# T32275)|Y
01|148730|2|1|Bearings o-rings and collet nut to be replaced.|Y
01|148742|1|1|Installed with PS-N46E at factory|Y
01|148742|2|1|Installed on NC5-46-C25-90 at factory|Y
01|148744|1|1|Must drop ship to the school to receive this special|Y
01|148744|1|2|discount|Y
01|148757|1|1|Direct shipment from Howa to Mindrill Australia|Y
01|148761|2|1|Awarded extra 5% per Winter Promo|Y
01|148766|1|1|Includes cust shelves and hardware|Y
01|148766|2|1|Fanuc CR35i collaborative robot with custom frame.|Y
01|148766|3|1|Includes 40hrs three session: Maintenaceoperator and|Y
01|148766|3|2|robot training on site.|Y
01|148766|4|1|Includes: 8hrs of vision system training for setup.|Y
01|148768|2|1|In stock option.This is a 1 diameter|Y
01|148768|3|1|Awarded extra 5% per Winter Promo|Y
01|148771|1|1|NC5-46-C25-125|Y
01|148771|2|1|Installed on NC5-46-C25-125 at the factory|Y
01|148771|4|1|Installed with PS-N46E at factory|Y
01|148771|5|1|Installed on NC5-46-C25-90 at factory|Y
01|148779|1|1|*stocked alternative for MCAT50-FMD19.05-90U|Y
01|148779|6|1|Alternative for C5017-0025-4.00|Y
01|148779|6|2|This balanceable w/ 4 gl|Y
01|148786|11|1|An additional 10% discount has been applied to this|Y
01|148786|11|2|quotation per our Winter Promo. Thank you!|Y
01|148789|1|1|Reference RGA# LVR-56356|Y
01|148789|1|2|Repair of C40RA-0025M s/n: 18902340 01|Y
01|148789|1|3|(Mimatic# 175241)|Y
01|148789|2|1|Bearings seals o-rings and damaged CAT 40 Input|Y
01|148789|2|2|spindle to be replaced.|Y
01|148798|16|1|An additional 5% discount has been added to the items|Y
01|148798|16|2|on this Quotation per our Winter Promo.|Y
01|148801|1|1|Requires Angle Head Questionnaire|Y
01|148807|1|1|KM42-17.2 Non stock standard special that it not|Y
01|148807|1|2|cancelable  nor returnable once ordered|Y
01|148807|1|3|Pricing valid thru 3/2021|Y
01|148810|1|1|BMT65-ER25-AD-ICE|Y
01|148810|1|2|BMT65 ER25 Adj- ICE Live Tool|Y
01|148819|7|1|MZQT5-ER25-AD-ICE|Y
01|148819|7|2|This items is a non standard stock item and is|Y
01|148819|7|3|considered special once an order is placed it|Y
01|148819|7|4|cannot be cancelled or returned|Y
01|148832|1|1|IT50X-SK16-165P no description other than collet chuck|Y
01|148833|4|1|***Largest Capacity 31.75mm|Y
01|148848|12|1|5% added to discount on this quote.|Y
01|148866|1|1|*special - non-returnable|Y
01|148882|5|1|Order placed must exceed $500 List to receive extra 5%|Y
01|148882|5|2|or over $5000 List to receive extra 10%|Y
01|148882|5|3|Extra discount has been applied|Y
01|148890|3|1|Intall Chip provided by the customer and re-balance|Y
01|148893|5|1|Applies to total amount of quote.|Y
01|148928|3|1|10% based on this quote in full|Y
01|148934|1|1|OKEX-ER40Z-ICE|Y
01|148934|1|2|Okuma Live Z-axis 90deg ER40 IntC 7MP BMT|Y
01|148934|1|3|This is a non-standard stock item once an order is|Y
01|148934|1|4|placed it cannot be cancelled or returned.|Y
01|148940|17|1|New Crate to Ship Back|Y
01|148949|1|1|RPLC for Birla BOAT I#202170137 Shortage(C/No.102)|Y
01|148949|1|2|ETA:1/18DHL I#202170232 NCV|Y
01|148961|3|1|5% added to discount on this quote for Winter Promo|Y
01|148964|2|1|5% added to discount Winter Promo.|Y
01|148966|7|1|drill for 10-24 tap|Y
01|148966|8|1|10-24 tap|Y
01|148966|9|1|#7 Drill for 1/4-20 Tap|Y
01|148966|10|1|Letter U drill for 7/16-20|Y
01|148966|11|1|7/16-20 Tap|Y
01|148966|12|1|Drill for 5/16 -24 tap|Y
01|148966|13|1|5/16-24 Tap|Y
01|148966|14|1|1/4-20 tap|Y
01|148966|16|1|For 3/4 Endmill|Y
01|148966|19|1|for 1/2 EM and 1/2 Drill Mill|Y
01|148966|20|1|3/8 rough and finish EM and .3785 Reamer|Y
01|148966|21|1|for 1/4 Drill Mill|Y
01|148968|35|1|An additional 10% discount has been added to the items|Y
01|148968|35|2|on this quotation per our Winter Promo. Thank you!|Y
01|148976|6|1|Extra 10% discount per line awarded per Winter Promo|Y
01|148987|1|1|*|Y
01|148989|5|1|Applies to total amount quoted.|Y
01|148991|3|1|Fanuc additional software opptions not included|Y
01|148991|3|2|4th/5th axis ladder must be present|Y
01|148993|16|1|Includes (2)SF-POT-HSK63 Pots listed below|Y
01|149004|1|1|HSK63A-SK10C-150 modified to HSK63A-SK10C-150P|N
01|149007|1|1|IT50X-SK6-165P|Y
01|149007|1|2|IT50 SK6 Collet chuck hi speed|Y
01|149009|3|1|Nikken ZKG16-1/4PS|Y
01|149009|3|2|8x6.3|Y
01|149018|1|1|*****  BILL ONLY  *****|Y
01|149026|1|1|PRICE INCLUDES: Shrink Fit Unit + 10 CAT40 Shrink Fit|Y
01|149026|1|2|Holder extended length with Coolant Ports|Y
01|149026|1|3|Cooling Unit 5pc Induction Ring Set 5pc Cooling|Y
01|149026|1|4|Bracket Set Storage Racks and Chuck Holders|Y
01|149034|5|1|5% added to discount for winter Promo.|Y
01|149035|10|1|Extra 10% Winter Promo discount applied|Y
01|149041|1|1|(Substitute for CAT40-SF0125-3.15)|Y
01|149041|6|1|(Substitute for CAT40-SF0187-5.12)|Y
01|149041|8|1|(Substitute for CAT40-SF0187-6.30)|Y
01|149041|11|1|(Substitute for CAT40-SF0312-5.12CP)|Y
01|149041|42|1|substituted for CAT40-SF0312-5.12|Y
01|149054|3|1|Part#E32-413(C) B/O ETA End Feb. 2021|Y
01|149054|3|2|**Please advise if ok to ship partial when sending PO**|Y
01|149076|1|1|P/N: BT40-AF1-30-OH|Y
01|149076|1|2|Automatic Back Spot Facing Arbor BT40 Taper Main BODY|Y
01|149076|2|1|P/N: BF130-19.812-31.75-50.8C|Y
01|149076|2|2|Arbor for above|Y
01|149076|3|1|P/N: 9BF130-19.812-31.72-50.8-I|Y
01|149076|3|2|Byte for above    MOQ is 3 pieces Pricing is each|Y
01|149076|4|1|P/N: AFC-9|Y
01|149076|4|2|Insert for above|Y
01|149086|2|1|4 PORT ROTARY JOINT FOR CNC260|Y
01|149099|5|1|Winter Promo>> 5% added to discount.|Y
01|149108|3|1|5% has been added to your discount Winter Promo|Y
01|149111|3|1|added in case the customer does not already have this|Y
01|149114|1|1|Tooling Certificate Number:|Y
01|149114|1|2|13205-2806-112020|Y
01|149117|2|1|An additional 5% Discount has been applied per our|Y
01|149117|2|2|Winter Promotion. Thank you!|Y
01|149120|6|1|OKL2-SK16X-ICE|Y
01|149120|6|2|This item is special once ordered it cannot be|Y
01|149120|6|3|cancelled or returned.|Y
01|149120|7|1|OKL2-SK16Z-ICE|Y
01|149120|7|2|This item is special once ordered it cannot be|Y
01|149120|7|3|cancelled or returned.|Y
01|149121|9|1|5% added to discount on this quote for Winter Promo.|Y
01|149121|9|2|Please note that order must be $500.00 list.|Y
01|149125|1|1|25000-2778-100920|Y
01|149140|2|1|Includes: Dual axis drive unit fiber optic cables|Y
01|149140|2|2|communications cables bulhead cables external cables|Y
01|149140|2|3|parameter changes service time and travel.|Y
01|149142|1|1|Reference RGA# TOR-56366|Y
01|149142|1|2|Repair of CAT50-UMT200UH|Y
01|149142|4|1|Calibration service included|Y
01|149149|3|1|5% has been added to the discount for this quote.|Y
01|149149|3|2|If list price goes under $500.00 discount will be 35%.|Y
01|149156|1|1|H63A-SF0750-60 HSK63A 3/4 Shrink Fit Holder.|Y
01|149156|1|2|Projection 60mm|Y
01|149156|2|1|H63A-SF0750-60 HSK63A 3/4 Shrink Fit Holder.|Y
01|149156|2|2|Projection 60mm|Y
01|149156|3|1|H63A-SF0750-60 HSK63A 3/4 Shrink Fit Holder.|Y
01|149156|3|2|Projection 60mm|Y
01|149164|2|1|CAT50-SF0312-5.12CP|Y
01|149164|2|2|CAT50-SF0312-5.12CP|Y
01|149164|2|3|CAT50 5/16 Shrink Fit Holder Pre-Balanced Coolant Ports|Y
01|149164|2|4|Projection 5.12|Y
01|149196|51|1|Quoted instead of -75. 75 is a special with higher cost|Y
01|149207|1|1|Howa#: #2 Pilot Plate Cover|Y
01|149212|8|1|5% extra discount awarded per Winter Promo|Y
01|149215|1|1|2 Tables 1 to 2 weeks A.R.O (2) 6weeks A.R.O|Y
01|149215|1|2|OPTION #1  Cables Included|Y
01|149215|2|1|(4) Units in Stock - 1 to 2 weeks A.R.O|Y
01|149215|2|2|OPTION #2  Cables Included|Y
01|149226|3|1|Please Note: Winter promo can be used for extra|Y
01|149226|3|2|discount. If you purchase between $500.00 to $4999.00|Y
01|149226|3|3|please take 20% off list. If you purchase anything|Y
01|149226|3|4|above $5000.00 list you can take 25% off list.|Y
01|149249|1|1|Presetter Stand Built in|Y
01|149252|4|1|An additional 10% has already been applied to the items|Y
01|149252|4|2|on this quotation per our Winter Promo!|Y
01|149269|4|1|5% extra added to discount Winter Promo.|Y
01|149270|1|1|30 pcs required for machine 1 delivering Mid April|Y
01|149270|1|2|20 pcs required for machine 2 delivering July|Y
01|149270|1|3|On quote file to confirm price/lead time|Y
01|149289|1|1|** M830W Control **|Y
01|149289|4|1|Installation includes: drive unit short bar fiber|Y
01|149289|4|2|optic cables communication cables bulk head cable|Y
01|149289|4|3|set external cable set parameter changes service|Y
01|149289|4|4|time and travel.|Y
01|149302|1|1|Haimer Part # 40.889.06.8.1002 6mm Shrink mold type|Y
01|149302|1|2|100mm GL|Y
01|149302|1|3|Lyndex Nikken Part # CAT40-SF6-100MT|Y
01|149302|3|1|Haimer Part # 40.889.1/4z.0001 - 1/4in Shrink fit|Y
01|149302|3|2|Mold Type 3.94 GL|Y
01|149302|3|3|Lyndex Nikken part # CAT40-SF0250-3.94MT|Y
01|149303|3|1|Installation includes: drive unit short bar fiber|Y
01|149303|3|2|optic cables communication cables bulk head cable|Y
01|149303|3|3|set external cable set parameter changes service|Y
01|149303|3|4|time and travel.|Y
01|149303|3|5|*** PRICING IS SPECIAL BASED ON QUANTIY OF 4 INSTALLED|Y
01|149303|3|6|AT THE SAME TIME AND AT THE SAME LOCATION ***|Y
01|149319|6|1|SPECIAL SPACER & MANIFOLD ADAPTER PLATE PER DRAWINGS|Y
01|149319|6|2|FROM JTEKT.|Y
01|149320|1|1|Reference CUR-56380|Y
01|149320|1|2|Repair of C50FHM-ER32-215IC-110TP s/n: 19901477 01|Y
01|149320|1|3|(Mimatic# 178139)|Y
01|149320|2|1|Bearings seals o-rings damaged flange adjustment|Y
01|149320|2|2|components stripped housing bolts and 15 degree|Y
01|149320|2|3|positioning pin assembly to be replaced. Recondition 1|Y
01|149320|2|4|input spindle and 1 ER 32 spindle.|Y
01|149321|1|1|Option 1 - Standard Collet|Y
01|149321|2|1|Option 2 - Blow Coolant Thru Spindle around flutes|Y
01|149321|3|1|Goes with option 2 - Jet Slots for coolant|Y
01|149321|4|1|Goes with option 2 - wrench to tighten coolant nut|Y
01|149327|1|1|***Partial set item on back order is our part#800-020|Y
01|149327|1|2|5/16 ETA Feb 2nd.***|Y
01|149331|3|1|ADDITIONAL 5% DISCOUNT FOR SPRING PROMO PRICING|Y
01|149332|6|1|5% ADDITIONAL DISCOUNT PER SPRING PROMO|Y
01|149332|6|2|WITH LIST PRICE OVER $500 TOTAL|Y
01|149354|1|1|TAR-56451|Y
01|149354|1|2|5AX-201FA-M|Y
01|149354|1|3|SN: 4186|Y
01|149356|7|1|An additional 5% discount has been added per our|Y
01|149356|7|2|Winter Promo for List Price Totals over $500.|Y
01|149374|1|1|5AX-350FA-RCN2-RJ6 SN: 3589|Y
01|149374|1|2|TILT AXIS CRASH NEEDS REBUILD|Y
01|149374|1|3|TAR-56455|Y
01|149378|13|1|10% has been added to the discount on this quote.|Y
01|149397|1|1|SK6-1 Collet Range: .035~.039|Y
01|149397|3|1|SK6-1/8A does not collapse this is on size.|Y
01|149407|1|1|1st Batch|Y
01|149407|2|1|1st Batch(w/ScrewOnKey)|Y
01|149407|3|1|1st Batch(w/ScrewOnKey)|Y
01|149407|4|1|1st Batch(w/ScrewOnKey)|Y
01|149407|5|1|1st Batch(w/ScrewOnKey)|Y
01|149407|6|1|1st Batch(w/ScrewOnKey)|Y
01|149407|7|1|1st Batch(w/ScrewOnKey)|Y
01|149407|8|1|1st Batch|Y
01|149409|3|1|Applies to total amount quoted.|Y
01|149422|3|1|Extra 10% hardwork promo discount|Y
01|149425|1|1|ORIZON SPEC: Bore Depth = 50mm|Y
01|149425|1|2|Coolant Tubes Pan Head Screws Chip Hole and|Y
01|149425|1|3|Balluf Chip# BIS-C-122-04/L installed at factory|Y
01|149425|2|1|ORIZON SPEC:|Y
01|149425|2|2|Coolant Tubes Pan Head Screws Chip Hole and|Y
01|149425|2|3|Balluf Chip# BIS-C-122-04/L installed at factory|Y
01|149429|1|1|TABLE IS IN STOCK DELIVERY IS FOR FINAL INSPECTION|Y
01|149429|1|2|AND CRATING.|Y
01|149429|1|3|ONLY 1 LFET IN STOCK|Y
01|149438|1|1|Installed with pullstud at factory-need machine info|Y
01|149438|1|2|non-returnablenon-cancelable|Y
01|149448|6|1|Line #7 on Withers PO|Y
01|149448|7|1|replaces C5005-0562-5.02 - Line #1 on Withers PO|Y
01|149448|8|1|Line #9 on Withers PO - Part Number was incorrect|Y
01|149448|8|2|They have C5005 and its C5003 lenght 1.75 is a|Y
01|149448|8|3|replacement from -1.58|Y
01|149450|2|1|P/N: ST32-MF19.812-31.75-5038C|Y
01|149450|2|2|Manual Back Spot Facing Arbor|Y
01|149476|11|1|5% has been added to your discount for the Winter Promo|Y
01|149476|11|2|Order must $500.00 list to take advantage of this.|Y
01|149494|3|1|Installation includes: drive unit short bar fiber|Y
01|149494|3|2|optic cables communication cables bulk head cable|Y
01|149494|3|3|set external cable set parameter changes service|Y
01|149494|3|4|time and travel.|Y
01|149496|7|1|Rotary union for APC (4 port)|Y
01|149509|6|1|Line #7 on Withers PO|Y
01|149509|7|1|replaces C5005-0562-5.02 - Line #1 on Withers PO|Y
01|149509|8|1|Line #9 on Withers PO - Part Number was incorrect|Y
01|149509|8|2|They have C5005 and its C5003 lenght 1.75 is a|Y
01|149509|8|3|replacement from -1.58|Y
01|149541|1|1|1st Batch|Y
01|149544|6|1|5% has been added to discount on this quote.|Y
01|149549|1|1|Reference RGA# LVR-56452|Y
01|149549|1|2|Repair of MNL12-ER40Z s/n: A0001 (Alps# T32214)|Y
01|149549|2|1|Bearings o-rings and collet nut to be replaced.|Y
01|149557|1|1|These are non-standard stock items and considered|Y
01|149557|1|2|specials. Once a PO has been issued these items cannot|Y
01|149557|1|3|be cancelled or returned.|Y
01|149572|1|1|NCAT50-SF0125-3.15  2LK TaperPlus NCAT50 1/8 Shrink|Y
01|149572|1|2|Fit. Cannot supply coolant ports on this tooling.|Y
01|149572|2|1|NCAT50-SF0187-3.15 2LK TaperPlus NCAT50 3/16 Shrink|Y
01|149572|2|2|Fit Holder. Cannot supply coolant ports on this tooling|Y
01|149572|4|1|NCAT50-SF0312-3.15CP 2LK TaperPlus NCAT50 5/16 Shrink|Y
01|149572|4|2|Fit Holder with Coolant Ports.|Y
01|149572|6|1|NCAT50-SF0437-3.15CP 2LK TaperPlus NCAT50 7/16 Shrink|Y
01|149572|6|2|Fit Holder with Coolant Ports.|Y
01|149589|1|1|Please Note: These are not in production at factory.|Y
01|149589|1|2|Production would begin upon receipt of order.|Y
01|149590|1|1|Collapse Range: 6.0-5.5mm|Y
01|149591|1|1|Test tooling is non-refundable|Y
01|149591|5|1|Test tooling is non-refundable|Y
01|149594|1|1|Delivery:  2 PIECES 3-4 Weeks ARO|Y
01|149594|1|2|2 PIECES 7-9 Weeks ARO|Y
01|149613|3|1|5% added to discount for Winter Promo.|Y
01|149615|2|1|*upon confirmation of specs of customer's machine|Y
01|149618|7|1|drill for 10-24 tap|Y
01|149618|8|1|10-24 tap|Y
01|149618|9|1|#7 Drill for 1/4-20 Tap|Y
01|149618|10|1|Letter U drill for 7/16-20|Y
01|149618|11|1|7/16-20 Tap|Y
01|149618|12|1|Drill for 5/16 -24 tap|Y
01|149618|13|1|5/16-24 Tap|Y
01|149618|14|1|1/4-20 tap|Y
01|149618|16|1|For 3/4 Endmill|Y
01|149618|19|1|for 1/2 EM and 1/2 Drill Mill|Y
01|149618|20|1|3/8 rough and finish EM and .3785 Reamer|Y
01|149618|21|1|for 1/4 Drill Mill|Y
01|149626|1|1|Replacement Table for 5AX-201FA SN: 4186|Y
01|149626|1|2|TAR-56451 we will re-use original motors|Y
01|149626|1|3|10% discount is core trade in discount|Y
01|149649|2|1|NCAT40-SF0125-4.00|Y
01|149649|3|1|NCAT40-SF0187-4.00|Y
01|149649|4|1|NCAT40-SF0250-4.00|Y
01|149649|5|1|NCAT40-SF0312-4.00|Y
01|149649|6|1|NCAT40-SF0375-4.00|Y
01|149649|7|1|NCAT40-SF0500-3.75|Y
01|149649|8|1|NCAT40-SF0625-3.75|Y
01|149649|12|1|NCAT40-SF6-4.00|Y
01|149654|1|1|HSK63A-FMC22-90 with coolant ports.|Y
01|149663|3|1|An additional 5% Discount has been applied per our|Y
01|149663|3|2|Winter Promotion.|Y
01|149676|8|1|5% extra added to discount Winter Promo on this quote|Y
01|149676|8|2|Order must be $500.00 list and above.|Y
01|149679|1|1|Reference RGA# LVR-56469|Y
01|149679|1|2|Repair of MNL12-ER32Z-MS s/n: A1025 (Alps# T32206)|Y
01|149679|2|1|Bearings o-rings collet nuts & spindle to be replaced|Y
01|149683|1|1|This item is considered special once ordered it|Y
01|149683|1|2|cannot be cancelled or returned.|Y
01|149717|1|1|Reference RGA# CUR-55993|Y
01|149717|1|2|Repair of B40RAM-ER32-187 s/n: 37092-01|Y
01|149717|1|3|(Mimatic# 135470)|Y
01|149717|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|149717|2|2|1 input spindle.|Y
01|149719|3|1|Replaces SKN-10BJ|Y
01|149719|8|1|Replaces SKN-10B|Y
01|149719|9|1|Replaces SKN-10B|Y
01|149725|6|1|NORTHFIELD 450 PNEUMATIC 3 JAW CHUCK|Y
01|149725|6|2|WITH AIRSENSE FEATURE|Y
01|149725|7|1|NORTHFIELD 450 ALUMINUM CHUCK JAWS|Y
01|149725|8|1|Base Plate for Medium Bed Robodrill|Y
01|149737|3|1|Includes Installation Drive Unit Bulkhead Cables|Y
01|149737|3|2|External Cables Service Time & Travel.|Y
01|149738|4|1|We do not offer a 20mm Hydraulic Holder but can offer|Y
01|149738|4|2|the 1 and a 20mm collet|Y
01|149738|26|1|Extra 10% discount applied|Y
01|149755|1|1|SKN-10B was discontinued direct replacement is SKN-10K|Y
01|149771|3|1|Installation includes: drive unit short bar fiber|Y
01|149771|3|2|optic cables communication cables bulk head cable|Y
01|149771|3|3|set external cable set parameter changes service|Y
01|149771|3|4|time and travel.|Y
01|149773|10|1|wrench for either above|Y
01|149775|10|1|Replaces HSK63A-TC0562-3.98C|Y
01|149788|2|1|CABLE MANAGEMENT SWING BOX. ALLOWS ROTATION OF B AXIS|Y
01|149788|3|1|EXTENDED LENGTH EXTERNAL POWER AND FEEDBACK CABLE SET|Y
01|149788|4|1|PRICE IS NET TO DMG MORI|Y
01|149788|4|2|PRICE INCLUDES TRAVEL EXPENSES SERVO AMPS AND|Y
01|149788|4|3|REQUIRED CABLE MANAGEMENT COMPONENTS.|Y
01|149801|13|1|Extra 5% discount applied per Winter Promo|Y
01|149809|12|1|Tailstock with confirmation switch for automation.|Y
01|149817|1|1|KM32-14.75 / Non-Cancelable or Returnable|Y
01|149817|3|1|KM32-6.8 Non-Cancelable or Returnable|Y
01|149837|12|1|Extra 10% Winter Promo discount applied. Order placed|Y
01|149837|12|2|must total over $5K list price|Y
01|149840|1|1|200MM Tilt Rotary table with Haas motor and cables|Y
01|149859|2|1|Replaces part # C4017-0011-4.00.Part # change only|Y
01|149861|3|1|5a.|Y
01|149861|4|1|5d.|Y
01|149861|5|1|5f.|Y
01|149861|6|1|C|Y
01|149861|7|1|D|Y
01|149861|8|1|5c.|Y
01|149863|7|1|5% ADDITIONAL DISCOUNT FROM $500 - $4999|Y
01|149863|7|2|10% ADDITIONAL DISCOUNT ABOVE $5000 LIST PRICE|Y
01|149866|1|1|ETA 1-2 weeks upon receipt of PO|Y
01|149867|1|1|Discontinued model Tool Cert promo does not apply.|Y
01|149871|1|1|BLAKE USED DEMO MACHINE|Y
01|149882|6|1|C40RAM-MI40-180IC-65TP CAT40 MI40 Angle Head Twin|Y
01|149882|6|2|Spindle 65mm Pitch Tapered Pin;Int/Ext coolant ; L=180;|Y
01|149882|6|3|1:1 Gear; Max 8000 RPM; 30NmRef drwg # 00058316|Y
01|149884|3|1|Regular: non-high speed|Y
01|149884|7|1|Regular Wrench|Y
01|149884|8|1|High Speed wrench|Y
01|149888|1|1|1st Batch/(1)861977 Carpenter Ind./Hause Machine|Y
01|149888|2|1|1st Batch/(1)861977 Carpenter Ind./Hause Machine|Y
01|149888|3|1|1st Batch/stock   10/21 DWG approved by Andrew|Y
01|149893|4|1|Scale Mounting Kit|Y
01|149893|5|1|Custom 2-Port Rotary Joint|Y
01|149893|6|1|Custom 5M Cable Set|Y
01|149895|1|1|1st Batch/For stock  9/17 approved by Andrew|Y
01|149905|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|149905|2|1|P/N: D32-6|Y
01|149905|2|2|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|149929|9|1|Replaces part #C40R5-0562-3.05.See attached drawing|Y
01|149929|19|1|Extra 10% promo discount applied|Y
01|149944|9|1|Please Note: Winter promo 10% extra discount applied.|Y
01|149944|9|2|If order goes below $5000.00 list I will need to|Y
01|149944|9|3|re-quote.|Y
01|149946|1|1|3 pieces stock|Y
01|149946|1|2|13 pieces ETA 1-2 weeks|Y
01|149946|1|3|bal 2.5mths mfg plus 1-2wks ship|Y
01|149955|2|1|Extra 5% Winter Promo discount applied|Y
01|149956|2|1|Extra promo discount added|Y
01|149963|1|1|Machine: Nakamura-Tome SC 300 II lathe|Y
01|149967|1|1|IT50-CZF32-120 Zero Fit Type Milling Chuck IT50 Taper|Y
01|149978|1|1|HSK125A-C3/4-115 3/4 Milling Chuck w/ 115mm GL|Y
01|149978|1|2|1 - 9 piece pricing|Y
01|149978|2|1|HSK125A-C3/4-115 3/4 Milling Chuck w/ 115mm GL|Y
01|149978|2|2|10 - 19 piece pricing|Y
01|149978|3|1|HSK125A-C3/4-115 3/4 Milling Chuck w/ 115mm GL|Y
01|149978|3|2|20+ piece pricing|Y
01|149979|1|1|Reference RGA# TOR-56266|Y
01|149979|1|2|Repair of PRE-PART-05PAN|Y
01|149979|4|1|Labor cost for the repair in Italy|Y
01|149979|5|1|Ship to Elbo Controlli in Italy|Y
01|149979|6|1|Ship from Elbo Controlli in Italy|Y
01|149986|2|1|NET price|Y
01|149986|2|2|This holder is a standard holder modified to add|Y
01|149986|2|3|2 DIN holes|Y
01|149992|2|1|Cables|Y
01|149994|2|1|Extra 5% promo discount applied|Y
01|150002|5|1|Promo does not apply|Y
01|150002|6|1|Promo does not apply|Y
01|150003|10|1|Applies to total amount of quote. Will re-quote if|Y
01|150003|10|2|quantities change.|Y
01|150009|2|1|An additional 5% has been applied to this item per our|Y
01|150009|2|2|Winter Promotion.|Y
01|150011|6|1|An additional 5% discount has been applied to these|Y
01|150011|6|2|items per our Winter Promotion.|Y
01|150013|1|1|Reference RGA# LVR-56495|Y
01|150013|1|2|Repair of BMT65-ER32Z-ICE-CCW s/n:78019 10|Y
01|150013|1|3|(Mimatic# 186492)|Y
01|150013|2|1|Bearings seals and o-rings to be replaced.|Y
01|150013|2|2|Recondition output spindle.|Y
01|150014|1|1|Draw Screw is pre-threaded to M65x2|Y
01|150014|1|2|Customer must confirm existing draw tube threads to|Y
01|150014|1|3|match the chuck|Y
01|150030|9|1|Optional: Highly recomended|Y
01|150033|32|1|L1 2.69|Y
01|150033|32|2|L2 6.57|Y
01|150041|1|1|MODIFICATION-DSCREW-THREAD|Y
01|150052|1|1|Reference RGA# LVR-56441|Y
01|150052|1|2|Repair of T32017 s/n: A0310|Y
01|150052|2|1|Bearings O-Rings Collet Nut Front cover and Rear|Y
01|150052|2|2|cover to be replaced.|Y
01|150052|4|1|Repair of T32018 s/n: A0427|Y
01|150052|5|1|Bearings o-rings top cover and collet nut to be|Y
01|150052|5|2|replaced.|Y
01|150055|1|1|Reference RGA# LVR-56189|Y
01|150055|1|2|Repair of OKL4-ER40X s/n: AL131 (Alps# OK102-18000)|Y
01|150055|2|1|Bearings o-rings collet nut drive shaft and gears to|Y
01|150055|2|2|be replaced.|Y
01|150055|4|1|Repair of OKL4-ER40X s/n:AL119 (Alps# OK102-18000)|Y
01|150055|5|1|Bearings o-rings collet nut drive shaft and gears to|Y
01|150055|5|2|be replaced.|Y
01|150060|2|1|This item is considered special once ordered it|Y
01|150060|2|2|cannot be canceled or returned|Y
01|150060|3|1|This item is considered special once ordered it|Y
01|150060|3|2|cannot be canceled or returned|Y
01|150060|4|1|SKJ25-12.5|Y
01|150060|4|2|This item is considered special once ordered it|Y
01|150060|4|3|cannot be canceled or returned.|Y
01|150060|6|1|This item is considered special once ordered it|Y
01|150060|6|2|cannot be canceled or returned|Y
01|150060|7|1|This item is considered special once ordered it|Y
01|150060|7|2|cannot be canceled or returned|Y
01|150060|8|1|NBT50-RAC43-180K-C|Y
01|150060|8|2|This item is considered special once ordered it|Y
01|150060|8|3|cannot be canceled or returned|Y
01|150060|9|1|NBT50-RAC43-195K-C|Y
01|150060|9|2|This item is considered special once ordered it|Y
01|150060|9|3|cannot be canceled or returned.|Y
01|150060|10|1|NBT50-RAC43-225K-C|Y
01|150060|10|2|This item is considered special once ordered it|Y
01|150060|10|3|cannot be canceled or returned.|Y
01|150060|11|1|NBT50-RAC43-240K-C|Y
01|150060|11|2|This item is considered special once ordered it|Y
01|150060|11|3|cannot be canceled or returned.|Y
01|150060|12|1|NBT50-RAC32-225K-C|Y
01|150060|12|2|This item is considered special once ordered it|Y
01|150060|12|3|cannot be canceled or returned.|Y
01|150060|13|1|NBT50-RAC53-210K-C|Y
01|150060|13|2|This item is considered special once ordered it|Y
01|150060|13|3|cannot be canceled or returned.|Y
01|150060|14|1|NBT50-ZMAC42-180V-I|Y
01|150060|14|2|This item is considered special once ordered it|Y
01|150060|14|3|cannot be canceled or returned.|Y
01|150060|15|1|NBT50-ZMAC42-195V-I|Y
01|150060|15|2|This item is considered special once ordered it|Y
01|150060|15|3|cannot be canceled or returned|Y
01|150060|16|1|NBT50-ZMAC42-225V-I|Y
01|150060|16|2|This item is considered special once ordered it|Y
01|150060|16|3|cannot be canceled or returned.|Y
01|150060|17|1|NBT50-ZMAC42-240V-I|Y
01|150060|17|2|This item is considered special once ordered it|Y
01|150060|17|3|cannot be canceled or returned.|Y
01|150060|18|1|NBT50-ZMAC32-225V-I|Y
01|150060|18|2|This item is considered special once ordered it|Y
01|150060|18|3|cannot be canceled or returned.|Y
01|150060|19|1|NBT50-ZMAC55R-210V|Y
01|150060|19|2|This item is considered special once ordered it|Y
01|150060|19|3|cannot be canceled or returned.|Y
01|150060|20|1|This item is considered special once ordered it|Y
01|150060|20|2|cannot be canceled or returned.|Y
01|150060|21|1|SP16-16-30|Y
01|150060|21|2|This item is considered special once ordered it|Y
01|150060|21|3|cannot be canceled or returned.|Y
01|150060|22|1|This item is considered special once ordered it|Y
01|150060|22|2|cannot be canceled or returned.|Y
01|150060|23|1|NBT50-FMC32-200|Y
01|150060|23|2|This item is considered special once ordered it|Y
01|150060|23|3|cannot be canceled or returned.|Y
01|150060|24|1|S.RCC-43K|Y
01|150060|24|2|This item is considered special once ordered it|Y
01|150060|24|3|cannot be canceled or returned.|Y
01|150060|25|1|S.RCC-32K|Y
01|150060|25|2|This item is considered special once ordered it|Y
01|150060|25|3|cannot be canceled or returned|Y
01|150060|26|1|S.RCC-53K|Y
01|150060|26|2|This item is considered special once ordered it|Y
01|150060|26|3|cannot be canceled or returned.|Y
01|150060|27|1|M5HZ-42V(M3)|Y
01|150060|27|2|This item is considered special once ordered it|Y
01|150060|27|3|cannot be canceled or returned.|Y
01|150060|28|1|M4HZ-32V-I|Y
01|150060|28|2|This item is considered special once ordered it|Y
01|150060|28|3|cannot be cancelled or returned.|Y
01|150060|29|1|M5HZ-55V(M3)|Y
01|150060|29|2|This item is considered special once ordered it|Y
01|150060|29|3|cannot be canceled or returned.|Y
01|150060|32|1|This item is considered special once ordered it|Y
01|150060|32|2|cannot be canceled or returned.|Y
01|150060|33|1|This item is considered special once ordered it|Y
01|150060|33|2|cannot be canceled or returned.|Y
01|150060|34|1|M2255|Y
01|150060|34|2|16 - ZMAC 32 -55 V-I Screw (T -6)|Y
01|150060|34|3|This item is considered special once ordered it|Y
01|150060|34|4|cannot be cancelled or returned.|Y
01|150063|1|1|1800 Watt Controller requires a single M-Code to be|Y
01|150063|1|2|connected via relay (hard wired).|Y
01|150063|8|1|Heidenhain Scale Kit includes Scale mounting adapter|Y
01|150063|8|2|hardware wiring & installation on Rotary Table.|Y
01|150064|9|1|An additional 10% discount has been applied to the Live|Y
01|150064|9|2|Tools per our Winter Promo.|Y
01|150079|1|1|HSK63A-SK13-70 HSK63A SK13 Slim Chuck|Y
01|150079|2|1|HSK63A-SK13-90 HSK63A SK13 Slim Chuck|Y
01|150079|3|1|HSK63A-SK13-105 HSK63A SK13 Slim Chuck|Y
01|150080|14|1|Replaces part #C5017-0032-6.00|Y
01|150080|25|1|Replaces part # C5021-1000-6.00|Y
01|150081|6|1|EXTRA 10% DISCOUNT FROM SPRING PROMO|Y
01|150095|1|1|Non-returnablenon-cancelable|Y
01|150095|2|1|Non-returnablenon-cancelable|Y
01|150106|2|1|Installation includes: drive unit short bar fiber|Y
01|150106|2|2|optic cables communication cables bulk head cable|Y
01|150106|2|3|set external cable set parameter changes service|Y
01|150106|2|4|time and travel.|Y
01|150107|2|1|Installation includes: drive unit short bar fiber|Y
01|150107|2|2|optic cables communication cables bulk head cable|Y
01|150107|2|3|set external cable set parameter changes service|Y
01|150107|2|4|time and travel.|Y
01|150108|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|150121|1|1|Quoted at NET price.|Y
01|150128|2|1|NET PRICE FOR DUAL AXIS AMPLIFIER & CABLING|Y
01|150133|1|1|Per Trinity-No revisions same as prior po#4018270|Y
01|150135|2|1|This item is considered special once ordered it|Y
01|150135|2|2|cannot be canceled or returned|Y
01|150135|3|1|This item is considered special once ordered it|Y
01|150135|3|2|cannot be canceled or returned|Y
01|150135|4|1|SKJ25-12.5|Y
01|150135|4|2|This item is considered special once ordered it|Y
01|150135|4|3|cannot be canceled or returned.|Y
01|150135|6|1|This item is considered special once ordered it|Y
01|150135|6|2|cannot be canceled or returned|Y
01|150135|7|1|This item is considered special once ordered it|Y
01|150135|7|2|cannot be canceled or returned|Y
01|150135|8|1|NBT50-RAC43-180K-C|Y
01|150135|8|2|This item is considered special once ordered it|Y
01|150135|8|3|cannot be canceled or returned|Y
01|150135|9|1|NBT50-RAC43-195K-C|Y
01|150135|9|2|This item is considered special once ordered it|Y
01|150135|9|3|cannot be canceled or returned.|Y
01|150135|10|1|NBT50-RAC43-225K-C|Y
01|150135|10|2|This item is considered special once ordered it|Y
01|150135|10|3|cannot be canceled or returned.|Y
01|150135|11|1|NBT50-RAC43-240K-C|Y
01|150135|11|2|This item is considered special once ordered it|Y
01|150135|11|3|cannot be canceled or returned.|Y
01|150135|12|1|NBT50-RAC32-225K-C|Y
01|150135|12|2|This item is considered special once ordered it|Y
01|150135|12|3|cannot be canceled or returned.|Y
01|150135|13|1|NBT50-RAC53-210K-C|Y
01|150135|13|2|This item is considered special once ordered it|Y
01|150135|13|3|cannot be canceled or returned.|Y
01|150135|14|1|NBT50-ZMAC42-180V-I|Y
01|150135|14|2|This item is considered special once ordered it|Y
01|150135|14|3|cannot be canceled or returned.|Y
01|150135|15|1|NBT50-ZMAC42-195V-I|Y
01|150135|15|2|This item is considered special once ordered it|Y
01|150135|15|3|cannot be canceled or returned|Y
01|150135|16|1|NBT50-ZMAC42-225V-I|Y
01|150135|16|2|This item is considered special once ordered it|Y
01|150135|16|3|cannot be canceled or returned.|Y
01|150135|17|1|NBT50-ZMAC42-240V-I|Y
01|150135|17|2|This item is considered special once ordered it|Y
01|150135|17|3|cannot be canceled or returned.|Y
01|150135|18|1|NBT50-ZMAC32-225V-I|Y
01|150135|18|2|This item is considered special once ordered it|Y
01|150135|18|3|cannot be canceled or returned.|Y
01|150135|19|1|NBT50-ZMAC55R-210V-I|Y
01|150135|19|2|This item is considered special once ordered it|Y
01|150135|19|3|cannot be canceled or returned.|Y
01|150135|20|1|This item is considered special once ordered it|Y
01|150135|20|2|cannot be canceled or returned.|Y
01|150135|21|1|SP16-16-30|Y
01|150135|21|2|This item is considered special once ordered it|Y
01|150135|21|3|cannot be canceled or returned.|Y
01|150135|22|1|This item is considered special once ordered it|Y
01|150135|22|2|cannot be canceled or returned.|Y
01|150135|23|1|NBT50-FMC32-200|Y
01|150135|23|2|This item is considered special once ordered it|Y
01|150135|23|3|cannot be canceled or returned.|Y
01|150135|24|1|S.RCC-43K|Y
01|150135|24|2|This item is considered special once ordered it|Y
01|150135|24|3|cannot be canceled or returned.|Y
01|150135|25|1|S.RCC-32K|Y
01|150135|25|2|This item is considered special once ordered it|Y
01|150135|25|3|cannot be canceled or returned|Y
01|150135|26|1|S.RCC-53K|Y
01|150135|26|2|This item is considered special once ordered it|Y
01|150135|26|3|cannot be canceled or returned.|Y
01|150135|27|1|M5HZ-42V|Y
01|150135|27|2|This item is considered special once ordered it|Y
01|150135|27|3|cannot be canceled or returned.|Y
01|150135|28|1|M4HZ-32V-I|Y
01|150135|28|2|This item is considered special once ordered it|Y
01|150135|28|3|cannot be cancelled or returned.|Y
01|150135|29|1|M5HZ-55V|Y
01|150135|29|2|This item is considered special once ordered it|Y
01|150135|29|3|cannot be canceled or returned.|Y
01|150135|32|1|This item is considered special once ordered it|Y
01|150135|32|2|cannot be canceled or returned.|Y
01|150135|33|1|This item is considered special once ordered it|Y
01|150135|33|2|cannot be canceled or returned.|Y
01|150135|34|1|M2255|Y
01|150135|34|2|16 - ZMAC 32 -55 V-I Screw (T -6)|Y
01|150135|34|3|This item is considered special once ordered it|Y
01|150135|34|4|cannot be cancelled or returned.|Y
01|150137|4|1|RFQ# 203492|Y
01|150137|5|1|RFQ# 203493|Y
01|150137|6|1|RFQ# 203494|Y
01|150137|7|1|RFQ# 203495|Y
01|150137|8|1|RFQ# 203496|Y
01|150137|9|1|RFQ# 203498|Y
01|150137|10|1|RFQ# 203499|Y
01|150137|11|1|RFQ# 203500|Y
01|150137|12|1|RFQ# 203684|Y
01|150137|13|1|RFQ# 394656|Y
01|150137|14|1|RFQ# 394657|Y
01|150167|2|1|CAT40 Spindle Base Included Mechanical Clamping with|Y
01|150167|2|2|any Retention Knob. Software Updates free for the life|Y
01|150167|2|3|of the Presetter and includes over 50 machine posts.|Y
01|150173|1|1|direct replacement for C5017-1000-5.50|Y
01|150184|1|1|CAT40-CZF32-120U-IDU Zero Fit Type Milling Chuck|Y
01|150184|1|2|32mm X 120mm gage length.|Y
01|150184|1|3|Pricing reflects a minimum order of 3 to 6 holders.|Y
01|150184|2|1|Pricing reflects a purchase order of 7 to 12 holders.|Y
01|150187|5|1|Extra 10% promo discount given|Y
01|150199|8|1|for CAT40-SK16-60U-IDU|Y
01|150199|9|1|for CAT40-SK20-90U-IDU|Y
01|150200|2|1|MSA1-99584 (Tentative #)|Y
01|150200|2|2|X-axis Face milling New Capto4 DMG MORI|Y
01|150200|2|3|Internal & External coolant|Y
01|150200|3|1|MSA1-99585 (Tentative #)|Y
01|150200|3|2|Z-axis Face milling New Capto4 DMG MORI|Y
01|150200|3|3|Internal & External coolant|Y
01|150230|8|1|*Option|Y
01|150230|8|2|*Quoted as NET pricing|Y
01|150237|2|1|Installation includes: drive unit short bar fiber|Y
01|150237|2|2|optic cables communication cables bulk head cable|Y
01|150237|2|3|set external cable set parameter changes service|Y
01|150237|2|4|time and travel.|Y
01|150240|4|1|POTS INCLUDED WITH PRICE OF UNIT (2 FOR START 2 &|Y
01|150240|4|2|3 OF THEM FOR THE FI6)|Y
01|150245|1|1|Start2 Shrink Fit Machine includes: 1 Shrink Fit|Y
01|150245|1|2|Machine 1 Cooling Unit 5-piece induction ring set|Y
01|150245|1|3|5-piece cooling bracket set storage racks and 2x pots|Y
01|150245|1|4|PLUS any 10 HSK63A toolholders (any G/L CP MT etc.)|Y
01|150245|2|1|(2) HSK63A POTS INCLUDED: 1 FOR HEATING UNIT & 1 FOR|Y
01|150245|2|2|COOLING UNIT.|Y
01|150249|1|1|FI-6 SHRINK FIT MACHINE INCLUDES: MACHINE WITH 2|Y
01|150249|1|2|HEATING STATIONS & 1 COOLING STATION + 5-PIECE|Y
01|150249|1|3|INDUCTION RING SET 5-PIECE COOLING BRACKET SET|Y
01|150249|1|4|STORAGE RACKS & 3 HSK63A POTS FOR EACH STATION|Y
01|150249|1|5|PLUS 10 HSK63A TOOLHOLDERS OF ANY GL CP MT.|Y
01|150249|2|1|(3) HSK63A POTS INCLUDED: 2 FOR HEATING UNITS & 1|Y
01|150249|2|2|FOR COOLING UNIT.|Y
01|150250|5|1|An additional 5% discount has been applied to the items|Y
01|150250|5|2|on this quotation per our Winter Promotion|Y
01|150252|7|1|An additional 5% discount has already been applied to|Y
01|150252|7|2|the items on this quotation per our Winter Promo.|Y
01|150271|3|1|Extra 5% Winter Promo discount has been applied|Y
01|150274|4|1|TBD|Y
01|150274|5|1|TBD|Y
01|150306|1|1|CNCZ180LYA SN: 6037 REPAIR QUOTE|Y
01|150306|1|2|TABLE NEEDS FULL REBUILD|Y
01|150306|25|1|TAT-105 SN: 1103B|Y
01|150306|25|2|Tailstock needs full rebuild|Y
01|150311|1|1|NBT40-FMH22-47-90|Y
01|150311|1|2|Taper plus Face mill arbor|Y
01|150311|2|1|NBT40-FMH22-47-150|Y
01|150311|2|2|Taper plus Face mill arbor|Y
01|150312|1|1|Reference RGA# LVR-56506|Y
01|150312|1|2|Repair of MNL12-ER32X-ICE-10K s/n: 88683 10|Y
01|150312|1|3|(Mimatic# 100876)|Y
01|150312|2|1|Bearings seals and o-rings to be replaced.|Y
01|150312|2|2|Recondition 1 spindle.|Y
01|150325|2|1|Installation includes: drive unit short bar fiber|Y
01|150325|2|2|optic cables communication cables bulk head cable|Y
01|150325|2|3|set external cable set parameter changes service|Y
01|150325|2|4|time and travel.|Y
01|150329|10|1|Extra 5% Winter Promo discount applied|Y
01|150332|1|1|KM2-41.75***KM2 Straight Collet/Sleeve 41.75mm***|Y
01|150333|10|1|Extra 5% Winter Promo discount applied|Y
01|150346|1|1|Will need to verify P&D|Y
01|150360|7|1|Extra 5% Winter Promo Discount applied|Y
01|150384|1|1|***2 free taper pots of customer's choice|Y
01|150385|8|1|2 Piece Steel Black Oxided Sub Plates|Y
01|150385|9|1|Ellison to mount Rotary/Tailsock/Sub Plate Assembly|Y
01|150385|9|2|Lyndex-Nikken to perform Installation to machine contro|Y
01|150395|7|1|Tailstock for M-code connection.|Y
01|150395|7|2|M-code must be available installation not inlcuded|Y
01|150395|7|3|Please contact Yamazen for installation|Y
01|150398|36|1|Please take advantage of Lyndex-Nikkens Winter Promo!|Y
01|150398|36|2|$500.00 list up to $4999.00 take an extra 5% >>37%|Y
01|150398|36|3|$5000.00 and above take an extra 10% >> 42%.|Y
01|150405|3|1|C4-Testbar-300  CAPTO4 Testbar  Dia 32 GL 180mm|Y
01|150405|4|1|NBT30-TB40-150 BT30 Taper Plus Test Bar 150mm Gage|Y
01|150405|4|2|Need to Specify Retention Knob when ordering.|Y
01|150405|5|1|NBT30-TB40-200 BT30 Taper Plus Test Bar 200mm Gage|Y
01|150405|5|2|Need to Specify Retention Knob when ordering.|Y
01|150419|1|1|Tooling Certificate #13485-2836-010621RT|Y
01|150425|5|1|Added extra 10% promo discount to pass to Bill|Y
01|150426|1|1|ITEM IS A SPECIAL.  DEPOSIT AT TIME OF ORDER REQUIRED|Y
01|150426|2|1|External (Cutting Area) Cable Set|Y
01|150426|2|2|Length TBD|Y
01|150431|2|1|P/N: NCAT40-SF16-80CP|Y
01|150431|2|2|Dual Contact CAT40 16mm Shrink Fit Holder Coolant Port|Y
01|150432|1|1|C6-FMH27-60-60  Capto C6 Face Mill Holder 27mm|Y
01|150432|1|2|Quoted at NET price.|Y
01|150435|2|1|Quoted as NET pricing-Yamazen Promo|Y
01|150435|3|1|Quoted as NET pricing-Yamazen Promo|Y
01|150435|4|1|Quoted as NET pricing-Yamazen Promo|Y
01|150435|5|1|Quoted as NET pricing-Yamazen Promo|Y
01|150435|7|1|Quoted as NET pricing-Yamazen Promo|Y
01|150435|8|1|Quoted as NET pricing-Yamazen Promo|Y
01|150446|1|1|Non cancellable Non returnable|Y
01|150446|2|1|Non cancellable Non returnable|Y
01|150446|3|1|Non cancellable Non returnable|Y
01|150446|4|1|Non cancellable Non returnable|Y
01|150458|1|1|cnc180 sn: 7890|Y
01|150458|1|2|Customer getting overload alarm table needs rebuilt|Y
01|150458|1|3|and some cables need replacing as well|Y
01|150458|5|1|TCE-2FAA2i Power Cable|Y
01|150458|24|1|1.5M External Cable Set|Y
01|150460|6|1|2 Piece Steel Black Oxided Sub Plates|Y
01|150460|7|1|Ellison to mount Rotary/Tailsock/Sub Plate Assembly|Y
01|150460|7|2|Lyndex-Nikken to perform Installation to machine contro|Y
01|150487|1|1|Currently 8pcs have chip hole.5ea more pieces avail to|Y
01|150487|1|2|add chip hole|Y
01|150487|2|1|Inspect to confirm item has chip hole|Y
01|150493|2|1|Quted at NET price.|Y
01|150495|1|1|Pull Stud# PS-123E Included.|Y
01|150495|2|1|Pull Stud# PS-123E Included.|Y
01|150495|4|1|Pull Stud# PS-123E Included.|Y
01|150495|5|1|Pull Stud# PS-123E Included.|Y
01|150495|10|1|Pull Stud# PS-123E Included.|Y
01|150495|11|1|Pull Stud# PS-123E Included.|Y
01|150501|1|1|BMT55 Right Angle (2 Spindle - Y-AXIS)|Y
01|150501|1|2|ER25 Live Tool|Y
01|150501|1|3|Ref. WTO part# 413502008-55|Y
01|150502|2|1|EXTERNAL POWER CABLE SET|Y
01|150502|2|2|EXTERNAL FEEDBACK CABLE SET|Y
01|150502|5|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|150502|5|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|150502|5|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|150502|5|4|TRAVEL.|Y
01|150503|2|1|EXTERNAL POWER CABLE SET|Y
01|150503|2|2|EXTERNAL FEEDBACK CABLE SET|Y
01|150503|5|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|150503|5|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|150503|5|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|150503|5|4|TRAVEL.|Y
01|150504|2|1|FI-6 SHRINK FIT MACHINE INCLUDES: MACHINE WITH 2|Y
01|150504|2|2|HEATING STATIONS & 1 COOLING STATION + 5-PIECE|Y
01|150504|2|3|INDUCTION RING SET 5-PIECE COOLING BRACKET SET|Y
01|150504|2|4|STORAGE RACKS & 3 HSK63A POTS FOR EACH STATION|Y
01|150504|2|5|PLUS 10 HSK63A TOOLHOLDERS OF ANY GL CP MT.|Y
01|150504|3|1|(3) HSK63A POTS INCLUDED: 2 FOR HEATING UNITS & 1|Y
01|150504|3|2|FOR COOLING UNIT.|Y
01|150504|8|1|AD apprvd taking from H stock|Y
01|150504|9|1|Ask AD for stock|Y
01|150504|11|1|Ask AD for H stock|Y
01|150505|4|1|+/-3 second scale with mounting kit.|Y
01|150505|7|1|Installation includes: Drive unit short bar fiber|Y
01|150505|7|2|optic cable communications cable parameter changes|Y
01|150505|7|3|service time and travel.|Y
01|150511|2|1|An additional 5% Discount has already been applied to|Y
01|150511|2|2|these items per our Winter Promo.|Y
01|150520|1|1|1st Batch|Y
01|150536|1|1|Table set up with HAAS motors and cables|Y
01|150536|1|2|AIR BRAKES|Y
01|150536|3|1|FREE $1K Tooling Certificate good for list price tool|Y
01|150536|3|2|holders.|Y
01|150536|4|1|***  This includes travel and labor for on-site|Y
01|150536|4|2|parameter support. *Machine MUST have 4/5 interface|Y
01|150536|4|3|from HAAS turned on prior to Lyndex-Nikken arrival  ***|Y
01|150540|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|150542|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|150542|4|1|Quoted as NET pricing|Y
01|150557|1|1|Part# C5007-1000-5.50DIN-M|Y
01|150557|1|2|CAT50 100TG Collet Chuck w/ 5.50 GL|Y
01|150557|1|3|**Modified DIN form B Coolant Thru Flange|Y
01|150562|3|1|Extra 5% discount added per Winter Promo|Y
01|150568|1|1|1st Batch|Y
01|150568|2|1|1st Batch|Y
01|150568|3|1|1st Batch|Y
01|150568|4|1|1st Batch|Y
01|150568|5|1|1st Batch|Y
01|150568|6|1|Req INS/Quality Issue|Y
01|150580|3|1|5% has been added to the discount Winter Promo.|Y
01|150582|7|1|Winter Promo Applied to discount 5%.|Y
01|150600|1|1|Start 2 SF Package Price includes unit and 2 free pots|Y
01|150600|1|2|10 free holders and Unit accessories|Y
01|150602|1|1|Alps part # T10204|Y
01|150602|1|2|Machine is NZX4000 - 2-1/2 boring bar static holder|Y
01|150617|1|1|Mimatic p/n 103521 - AGW-OK-A-40-MI50-I -|Y
01|150619|5|1|Northfield 16C collet closer with adapter and rotary|Y
01|150619|5|2|union.|Y
01|150623|2|1|Net Price includes Balluff chip BIS-C-122-04/L and|Y
01|150623|2|2|installation for each holder. We will laser mark|Y
01|150623|2|3|the toolholders at no charge #CS-027-090-002|Y
01|150623|4|1|Winter Promo of 5% has been added to the discount.|Y
01|150628|20|1|Winter Promo >>10% added to discount on this quote.|Y
01|150629|5|1|Northfield 16C collet closer with adapter and rotary|Y
01|150629|5|2|union.|Y
01|150630|1|1|One time special price for show table.|Y
01|150642|1|1|Tool Certificate #13860-2845-011821|Y
01|150644|1|1|200MM Tilt Rotary for CMX|Y
01|150644|2|1|200MM Tilt Rotary for NVX|Y
01|150644|3|1|Installation includes: Dual axis drive short bar|Y
01|150644|3|2|fiber optic cables communications cables bulkhead|Y
01|150644|3|3|cables external cables parameter changes service|Y
01|150644|3|4|time and travel.|Y
01|150664|1|1|MNZ20-ER16Z-10/12K|Y
01|150664|2|1|MNZ20-ER20Z-10/12K|Y
01|150664|3|1|MNZ20-ER25Z-10/12K|Y
01|150669|10|1|This itme is considered special once ordered it can't|Y
01|150669|10|2|be returned.|Y
01|150670|15|1|Winter Promo extra discount has been applied to this|Y
01|150670|15|2|quote.|Y
01|150677|5|1|Includes 8 Hours of Installation & Training|Y
01|150677|11|1|Includes 8 Hours of Installation & Training|Y
01|150678|1|1|If ordered by 2/11 ETA 1-2 weeks|Y
01|150678|1|2|after 2/11 ETA would be late March. We only ship|Y
01|150678|1|3|once a month from Howa|Y
01|150680|1|1|Quoted at NET pricing|Y
01|150680|2|1|Quoted at NET pricing|Y
01|150681|2|1|Quoted as NET pricing ref. SK promo|Y
01|150681|3|1|Quoted as NET pricing ref. SK promo|Y
01|150686|2|1|Thread to M60X2 to match draw tube per Andrew|Y
01|150691|1|1|TAR-56546|Y
01|150691|1|2|5AX-201 SN: 3603|Y
01|150691|1|3|Table needs full rebuild - both Axis|Y
01|150700|4|1|Extra 5% discount added per winter promo|Y
01|150702|3|1|Extra 5% added for Winter Promo|Y
01|150704|3|1|Winter promo of 5% added to this quote.|Y
01|150715|28|1|Please note that an additional 10% discount has already|Y
01|150715|28|2|been applied to the items on this quotation per our|Y
01|150715|28|3|Winter Hardwork Promo!|Y
01|150716|2|1|***CONFIRMING DELIVERY***|Y
01|150733|1|1|Quote is based on Standard pitch (60mm).|Y
01|150734|27|1|List price pending|Y
01|150734|28|1|List price pending|Y
01|150734|30|1|List price pending|Y
01|150734|32|1|Extra 10% applied per Winter Promo|Y
01|150742|2|1|NET price|Y
01|150744|3|1|Installation includes: Bulkhead cables external cables|Y
01|150744|3|2|parameter changes service time and travel.|Y
01|150744|3|3|DDR drive must be present.|Y
01|150747|1|1|ETA 4-5 Wks for qty 1 qty 2 or more 8-9 weeks|Y
01|150747|3|1|CAT50 MI63 Angle Head 110mm Pitch Taper Pin|Y
01|150747|3|2|C50RAM-MI63-215IC-110TP|Y
01|150747|3|3|ETA 4-5 Wks for qty 1 qty 2 or more 8-9 weeks|Y
01|150747|7|1|MI40 ER25 Collet Chuck Hold Long Type|Y
01|150747|10|1|YCM Double column vertical machine ctr. w/ Fanac|Y
01|150747|10|2|MXP-200i control         DCV-3016B      serial#:0003|Y
01|150747|11|1|YCM with all standard equipment and Fanuc CNC control|Y
01|150747|11|2|TV2610B            serial#:0063|Y
01|150747|12|1|YCM DCV-2012B DCV-2012B        serial#:10142|Y
01|150757|1|1|Part # MZMP46-ER25-AD-HS2-ICE|Y
01|150757|1|2|Replaces part # MZMP46-ER16-AD-HS on original RFQ|Y
01|150757|1|3|print attached to this quote.|N
01|150770|10|1|Can run dry or coolant|Y
01|150780|6|1|Winter Promo extra 5% added to quote. If quote goes|N
01|150780|6|2|under $500.00 list I will need to requote.|N
01|150784|1|1|BUDGETARY QUOTE FOR REBUILD OF CNCH202FA-M FOR|Y
01|150784|1|2|BAKER HUGHES - WOODLANDS|Y
01|150799|5|1|Please Note: This is the new part number replacing|Y
01|150799|5|2|SKN-6WBJ.|Y
01|150800|22|1|Replaces the SKN-10BJ|Y
01|150800|27|1|Replaces the part SKN-6WKJ|Y
01|150811|2|1|Quoted at NET pricing.|Y
01|150811|9|1|Applies to total amount quoted.|Y
01|150813|1|1|** 2.5 gage length|Y
01|150816|14|1|GL 5(127mm)|Y
01|150816|16|1|GL 6.48(164.6mm)|Y
01|150826|3|1|Replacement nut for BT35-DW3-105|Y
01|150827|2|1|Mark package & tool with Pratt & Whitney #CS2413-1|Y
01|150827|2|2|Quoted at NET price.|Y
01|150834|4|1|Installation includes: drive unit short bar fiber|Y
01|150834|4|2|optic cables communication cables bulk head cable|Y
01|150834|4|3|set external cable set parameter changes service|Y
01|150834|4|4|time and travel.|Y
01|150835|2|1|Pricing and delivery for: CNC803BFA|Y
01|150841|15|1|White Paint Color - matches previous tables|Y
01|150845|8|1|ORDERS OVER $5000 LIST PRICE QUALIFY FOR THE|Y
01|150845|8|2|SPRING PROMOTION EXTRA 10% DISCOUNT|Y
01|150846|3|1|Winter Promo discount 5% has been added to this quote.|Y
01|150850|6|1|Extra 5% Winter Promo discount added|Y
01|150858|3|1|Please Note: Winter promo discount of 5% has been|Y
01|150858|3|2|added to the quote. If order is under $500.00 list|Y
01|150858|3|3|Butlers discount is 46%.|Y
01|150863|3|1|BMT55-MI50X-ICE MIM#194474|Y
01|150863|3|2|BMT55 Live X-axis Str MI50 IntC/Ext.C/ ICE 7MP <RADIAL>|Y
01|150864|1|1|#2 Pilot Plate for H022M6 (HW-06C-LS)|Y
01|150865|1|1|Temp P/N: 140066|Y
01|150865|1|2|CAT40 taper ER32 AGH; 3 pin support 360deg adj.|Y
01|150865|1|3|L=317mm; L1=217mm; 1:1 Gear; max 6500RPM;70Nm torque|Y
01|150865|1|4|ref drwg# 00021886; wrenches included|Y
01|150865|2|1|Temp P/N: 140066|Y
01|150865|2|2|CAT40 taper ER32 AGH; 3 pin support 360deg adj.|Y
01|150865|2|3|L=317mm; L1=217mm; 1:1 Gear; max 6500RPM;70Nm torque|Y
01|150865|2|4|ref drwg# 00021886; wrenches included|Y
01|150878|1|1|M14X1.5P (WILL NOT FIT STARIGHT SHANK ER20 HOLDERS)|Y
01|150879|1|1|1st Batch(w/ScrewOnKey)|Y
01|150879|2|1|1st Batch(w/ScrewOnKey)|Y
01|150879|3|1|1st Batch(w/ScrewOnKey)|Y
01|150879|4|1|1st Batch(w/ScrewOnKey)|Y
01|150902|1|1|Re-etching/Relabel|Y
01|150902|2|1|Re-etching/Relabel|Y
01|150902|3|1|Re-etching/Relabel|Y
01|150902|4|1|Re-etching/Relabel|Y
01|150902|5|1|Re-etching/Relabel|Y
01|150902|6|1|Re-etching/Relabel|Y
01|150902|7|1|Re-etching/Relabel|Y
01|150902|8|1|Re-etching/Relabel|Y
01|150902|9|1|Re-etching/Relabel|Y
01|150902|10|1|Re-etching/Relabel|Y
01|150902|11|1|Re-etching/Relabel|Y
01|150910|1|1|Haas Factory outlet to supply sigma 1 motor and cables|Y
01|150927|1|1|ref. old B45-6000|Y
01|150928|7|1|With ID Chip Hole|Y
01|150928|9|1|Delivery: 3 in stock balance due at L-N 04/15.|Y
01|150928|11|1|Winter Promo 10% has been added to the quote.|Y
01|150928|11|2|If quantities change I will need to re-quote.|Y
01|150929|10|1|Extra 10% Winter Promo discount applied|Y
01|150939|1|1|Haas to supply motor and cable sigma 1|Y
01|150947|3|1|Extra 5% added Winter Promo|Y
01|150948|1|1|repl for B45-6000|Y
01|150976|5|1|Winter Promo 5% extra added to this quote.|Y
01|150977|2|1|EXTERNAL POWER CABLE SET|Y
01|150977|2|2|EXTERNAL FEEDBACK CABLE SET|Y
01|150977|3|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|150977|3|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|150977|3|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|150977|3|4|TRAVEL.|Y
01|150977|3|5|COST IS NET TO KOCH MACHINE TOOL|Y
01|150979|2|1|EXTERNAL POWER CABLE SET|Y
01|150979|2|2|EXTERNAL FEEDBACK CABLE SET|Y
01|150979|3|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|150979|3|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|150979|3|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|150979|3|4|TRAVEL.|Y
01|150979|3|5|COST IS NET TO KOCH MACHINE TOOL|Y
01|150983|2|1|EXTERNAL POWER CABLE SET|Y
01|150983|2|2|EXTERNAL FEEDBACK CABLE SET|Y
01|150983|3|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|150983|3|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|150983|3|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|150983|3|4|TRAVEL.|Y
01|150983|3|5|COST IS NET TO KOCH MACHINE TOOL|Y
01|150992|15|1|Applies to total amount of quote.|Y
01|150996|5|1|Chip hole added at Lyndex-Nikken Delivery 1 week.|Y
01|150996|7|1|With ID Chip Hole|Y
01|150996|9|1|Delivery: 3 in stock balance due at L-N 04/15.|Y
01|150996|11|1|Winter Promo 10% has been added to the quote.|Y
01|150996|11|2|If quantities change I will need to re-quote.|Y
01|151000|3|1|Quoted as a Conditional PO per Tom Dang email|Y
01|151002|8|1|2 Piece Steel Black Oxided Sub Plates|Y
01|151002|9|1|Ellison to mount Rotary/Tailsock/Sub Plate Assembly|Y
01|151002|9|2|Lyndex-Nikken to perform Installation to machine contro|Y
01|151009|10|1|Stand for E236N OR E346N|Y
01|151012|4|1|An additional 5% Discount has been applied to the above|Y
01|151012|4|2|items per our Winter Promo for over $500 List price.|Y
01|151018|1|1|P/N: MZQT47-ER32Z-HS2|Y
01|151018|1|2|Mazak Live Z-axis Hor 90deg ER32|Y
01|151018|1|3|184709|Y
01|151019|1|1|Quoted at NET price.|Y
01|151019|2|1|Quoted at NET price|Y
01|151019|2|2|Need to confirm machine/model specs drawing approval.|Y
01|151040|2|1|MSA1-99584 (Tentative #)|Y
01|151040|2|2|X-axis Face milling New Capto4 DMG MORI|Y
01|151040|2|3|Internal & External coolant|Y
01|151040|3|1|MSA1-99585 (Tentative #)|Y
01|151040|3|2|Z-axis Face milling New Capto4 DMG MORI|Y
01|151040|3|3|Internal & External coolant|Y
01|151042|9|1|BT30-ZL12-130|Y
01|151042|9|2|Nikken rigid tap holder|Y
01|151042|11|1|ZKG12-6-50L|Y
01|151042|11|2|105mm|Y
01|151042|12|1|55mm|Y
01|151044|1|1|use for 11/64|Y
01|151047|1|1|NET PRICING ON THESE TOOLS|Y
01|151054|2|1|NBT30-MDMS4S-80|Y
01|151054|2|2|2Lock TaperPlus NBT30 4mm Major Dream Shrink Fit|Y
01|151054|2|3|Holder Slim|Y
01|151060|1|1|Reference RGA# TOR-56577|Y
01|151060|1|2|Repair of PF-2|Y
01|151060|4|1|Calibration service included|Y
01|151072|7|1|An additional 5% discount has already been applied to|Y
01|151072|7|2|the items on this quotation per our Winter Hardwork|Y
01|151072|7|3|Promotion.|Y
01|151076|7|1|A 5% Discount has been applied to this quote per our|Y
01|151076|7|2|Winter Promotion.|Y
01|151082|18|1|Also for 100TG spanner nuts|Y
01|151086|1|1|Reference RGA# TOR-56565|Y
01|151086|1|2|Repair of CAT50-NPU13-190U|Y
01|151109|9|1|Winter Promo 5% extra discount added to quote.|Y
01|151126|4|1|Installation includes: drive unit short bar fiber|Y
01|151126|4|2|optic cables communication cables bulk head cable|Y
01|151126|4|3|set external cable set parameter changes service|Y
01|151126|4|4|time and travel.|Y
01|151126|7|1|Northfield Model 1000 Chuck|Y
01|151128|6|1|Winter promo 10% discount added to quote.|Y
01|151141|27|1|WILL SEE IF WE CAN EXPEDITE THESE; BEEN ON ORDER|Y
01|151141|27|2|SINCE 12/18/2021|Y
01|151141|30|1|ADDITIONAL 10% DISCOUNT FOR WINTER PROMO|Y
01|151144|1|1|Reference RGA# LVR-56535|Y
01|151144|1|2|Repair of OKL3-ER32Z-OFM s/n: Unknown|Y
01|151144|1|3|(Alps# OK109-13001)|Y
01|151144|2|1|Bearings o-rings collet nut and spindle to be|Y
01|151144|2|2|replaced.|Y
01|151169|1|1|NCAT50-SF0125-3.15  2LK TaperPlus NCAT50 1/8 Shrink|Y
01|151169|1|2|Fit. Cannot supply coolant ports on this tooling.|Y
01|151169|2|1|NCAT50-SF0187-3.15 2LK TaperPlus NCAT50 3/16 Shrink|Y
01|151169|2|2|Fit Holder. Cannot supply coolant ports on this tooling|Y
01|151169|4|1|NCAT50-SF0312-3.15CP 2LK TaperPlus NCAT50 5/16 Shrink|Y
01|151169|4|2|Fit Holder with Coolant Ports.|Y
01|151169|6|1|NCAT50-SF0437-3.15CP 2LK TaperPlus NCAT50 7/16 Shrink|Y
01|151169|6|2|Fit Holder with Coolant Ports.|Y
01|151172|1|1|300mm RT w/ Haas Motor & Cable Set|Y
01|151172|5|1|3-950-LRT-CNC260-10 10 Set Tru Chuck & Adapter Packge|Y
01|151172|6|1|Includes Table Installation Parameter Changes Service|Y
01|151172|6|2|Time & Travel|Y
01|151176|2|1|wrench for HSK63A-ER16S-100|Y
01|151183|7|1|Promo applies to total amount quoted.|Y
01|151190|13|1|Extra 10% Winter Promo discount added|Y
01|151192|2|1|Installation includes: drive unit short bar fiber|Y
01|151192|2|2|optic cables communication cables bulk head cable|Y
01|151192|2|3|set external cable set parameter changes service|Y
01|151192|2|4|time and travel.|Y
01|151194|2|1|Installation includes: drive unit short bar fiber|Y
01|151194|2|2|optic cables communication cables bulk head cable|Y
01|151194|2|3|set external cable set parameter changes service|Y
01|151194|2|4|time and travel.|Y
01|151198|9|1|Lyndex-Nikken to make position block.|Y
01|151198|9|2|Delivery is based upon final confirmation from|Y
01|151198|9|3|spindle drawing|Y
01|151203|4|1|Extra 5% Winter Promo applied|Y
01|151215|8|1|Extra 10% Winter Promo discount applied|Y
01|151217|1|1|BT30-TB40-300|Y
01|151217|1|2|test bar(PS is suppied by EU)|Y
01|151217|2|1|BT40-TB40-300|Y
01|151217|2|2|test bar(PS is suppied by EU)|Y
01|151217|5|1|BT30-TB40-300|Y
01|151217|5|2|test bar(PS is suppied by EU)|Y
01|151217|6|1|BT40-TB40-300|Y
01|151217|6|2|test bar(PS is suppied by EU)|Y
01|151222|1|1|part# 124881|Y
01|151222|1|2|Mazak Live Tool H-Type 90-Degree MI63 Modular Quick|Y
01|151222|1|3|**DISPLAY TOOL- w/ full warranty|Y
01|151222|5|1|part# 124881|Y
01|151222|5|2|Mazak Live Tool H-Type 90-degree MI63 Mod Quick Change|Y
01|151222|5|3|NEW|Y
01|151222|6|1|part# 124261|Y
01|151222|6|2|Mazak Live Tool V-Type Straight MI63 Modular Quick Chg|Y
01|151223|2|1|Installation includes: drive unit short bar fiber|Y
01|151223|2|2|optic cables communication cables bulk head cable|Y
01|151223|2|3|set external cable set parameter changes service|Y
01|151223|2|4|time and travel|Y
01|151223|2|5|***************************************************|Y
01|151223|2|6|Please note availability of Service Techs are|Y
01|151223|2|7|limited due to COVID-19 travel limitations. L-N|Y
01|151223|2|8|will make REASONABLE accomidations during this time.|Y
01|151238|1|1|NC5-63-FMA27-45|Y
01|151238|1|2|NC5 Face Mill Arbor Type A - 27mm Pilot  w/ 45mm L|Y
01|151238|1|3|installed with PS-N63AE pull stud|Y
01|151238|2|1|Installed on NC5-63-FMA27-45 at factory|Y
01|151238|4|1|NC5-63-FMA27-45|Y
01|151238|4|2|NC5 Face Mill Arbor Type A - 27mm Pilot  w/ 45mm L|Y
01|151238|4|3|installed with PS-N63AE pull stud|Y
01|151238|5|1|Installed on NC5-63-FMA27-45 at factory|Y
01|151238|7|1|NC5-63-FMA27-45|Y
01|151238|7|2|NC5 Face Mill Arbor Type A - 27mm Pilot  w/ 45mm L|Y
01|151238|7|3|installed with PS-N63AE pull stud|Y
01|151238|8|1|Installed on NC5-63-FMA27-45 at factory|Y
01|151240|4|1|Wrench to remove 16C collet stop - NO QUOTE|Y
01|151240|4|2|do not offer|Y
01|151242|2|1|P/N: T32334|Y
01|151242|2|2|1.25 Milling Chuck (Axial/Radial)|Y
01|151245|8|1|Winter Promo 5% has been added to the discount on this|Y
01|151245|8|2|quote.|Y
01|151246|4|1|This item is considered speical once ordered it|Y
01|151246|4|2|cannot be canceled or returned|Y
01|151246|5|1|This item is considered speical once ordered it|Y
01|151246|5|2|cannot be canceled or returned.|Y
01|151251|2|1|*|Y
01|151251|3|1|*|Y
01|151280|1|1|CAT50-ER16-4.00-DIN-M  CAT50 ER16  Solid Nut Collet|Y
01|151280|1|2|Chuck with 2-hole DIN modification|Y
01|151280|1|3|Net price includes modification charge.|Y
01|151280|5|1|CAT50-ER16-6.00-DIN-M  CAT50 ER16  Solid Nut Collet|Y
01|151280|5|2|Chuck with 2-hole DIN modification|Y
01|151280|5|3|Net price includes modification charge.|Y
01|151280|10|1|CAT50-ER20-4.00-DIN-M  CAT50 ER20  Solid Nut Collet|Y
01|151280|10|2|Chuck with 4-hole DIN modification|Y
01|151280|10|3|Net price includes modification charge.|Y
01|151280|14|1|CAT50-ER20-6.00-DIN-M  CAT50 ER20  Solid Nut Collet|Y
01|151280|14|2|Chuck with 2-hole DIN modification|Y
01|151280|14|3|Net price includes modification charge.|Y
01|151280|17|1|Winter Promo 5% extra discount has been added to this|Y
01|151280|17|2|quote.|Y
01|151303|4|1|Extra 5% Promo discount applied|Y
01|151318|1|1|Replacement Cylinder for CNCZ100-3W on Fanuc Robodrill|Y
01|151320|1|1|NET PRICING ON THESE TOOLS|Y
01|151327|3|1|Balancable no longer avail.It is discontinued|Y
01|151327|4|1|5% extra Winter Promo discount applied|Y
01|151339|7|1|Extra 5% discount added for $500 price break|Y
01|151341|3|1|Balanceable no longer avail.It is discontinued|Y
01|151341|4|1|5% extra Winter Promo discount applied|Y
01|151343|6|1|ST22SC-SK6-97|Y
01|151343|13|1|K5/8CM-MMC4-50|Y
01|151343|14|1|K3/4CM-MMC8-80|Y
01|151343|15|1|K1CM-MMC8-100|Y
01|151343|16|1|K20CM-MMC8-100|Y
01|151343|17|1|K22SC-MMC8-100|Y
01|151343|18|1|K25TG-MMC8C-100|Y
01|151348|2|1|HSK100A-AF2-70-OH|Y
01|151348|2|2|*Main Body|Y
01|151348|3|1|BF270-84-140-71.3C|Y
01|151348|3|2|**Arbor|Y
01|151348|4|1|9BF270-84-140-71.3-I|Y
01|151348|4|2|**Byte --> Min Qty Required: 3pc|Y
01|151348|5|1|AFC-35|Y
01|151348|5|2|**Insert  --> Min Qty Required: 10pc|Y
01|151348|15|1|HSK100A-AF2-70-OH|Y
01|151348|15|2|*Main Body|Y
01|151348|16|1|BF270-101.4-168-71.3C|Y
01|151348|16|2|**Arbor|Y
01|151348|17|1|9BF270-101.4-168-71.3-I|Y
01|151348|17|2|**Byte --> Min Qty Required: 3pc|Y
01|151348|18|1|AFC-45|Y
01|151348|18|2|**Insert  --> Min Qty Required: 10pc|Y
01|151351|2|1|45-48mm|Y
01|151352|1|1|NET PRICING ON THESE TOOLS|Y
01|151368|7|1|Extra 10% Winter Promo discount added|Y
01|151371|1|1|MSL12-CT40-C (T32332 but coolant version)|Y
01|151371|2|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|151378|1|1|2.5 Dia. x 13 Long - Material SC45 - HRC 30~35|Y
01|151388|7|1|10ft of wiring included|Y
01|151389|7|1|10ft of wiring included|Y
01|151393|1|1|CAT50-AF1-40-OH Main Body|Y
01|151393|1|2|NET price|Y
01|151393|2|1|BF140-31.75-57.15-104.6C  Arbor|Y
01|151393|2|2|NET price|Y
01|151393|3|1|9B140-31.75-57.15-104.6-I  Byte|Y
01|151393|3|2|Requires minimum order quantity of 3 ea|Y
01|151393|3|3|NET Price|Y
01|151393|4|1|NET price. Requires minimum order quantity of 10 ea|Y
01|151393|4|2|All items above are non standard stock and are not|Y
01|151393|4|3|canceable nor returnable once ordered|Y
01|151394|3|1|Cable set included with installation|Y
01|151400|4|1|Extra 5% Winter Promo discount applied|Y
01|151407|6|1|Extra 5% Winter Promo dicscount applied|Y
01|151409|1|1|1st Batch|Y
01|151409|2|1|1st Batch|Y
01|151409|3|1|1st Batch|Y
01|151412|7|1|BT40 1/4 Shrink Fit Holder Coolant Ports 4.74 GL|Y
01|151412|7|2|Note: Item is non-standard stock special. Cannot be|Y
01|151412|7|3|cancelled or returned.|Y
01|151417|2|1|Bulkhead and External Cable Set|Y
01|151417|3|1|Positive Air Purge - Modified Oil Cap Air Regulator &|Y
01|151417|3|2|Air Line.|Y
01|151430|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|151430|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|151431|1|1|Replacement Table 5AX-2002FA-M SN: 1603|Y
01|151431|1|2|Pricing reflects core trade in discount|Y
01|151431|1|3|** Special Pricing **|Y
01|151434|7|1|BT40 1.1/4 End Mill Holder Balanceable/6 Gage Length|Y
01|151450|13|1|Not valid on tool certificates. Applies to quote total.|Y
01|151463|5|1|Wrenches Included|Y
01|151464|3|1|Extra 10% Winter Promo discount applied|Y
01|151466|1|1|8pcs currently in Stock. Balance ETA aprx 5 weeks.|Y
01|151469|1|1|***MZQT47-MI50Z-SUB-OFF-ICE***|Y
01|151479|1|1|Req INS/Relabel|Y
01|151479|2|1|Req INS/Relabel|Y
01|151479|3|1|Req INS/Relabel|Y
01|151479|4|1|Req INS/Relabel Install SKN-16B|Y
01|151479|5|1|Req INS/Relabel|Y
01|151479|6|1|Req INS/Relabel|Y
01|151479|7|1|Req INS/Relabel|Y
01|151479|8|1|Req INS/Relabel|Y
01|151479|9|1|Req INS/Relabel|Y
01|151479|10|1|Req INS/Relabel Install SKN-13B|Y
01|151479|11|1|Req INS/Relabel|Y
01|151479|12|1|Req INS/Relabel|Y
01|151479|13|1|Req INS/Install E20-NUT & ER20-SCREW(C)|Y
01|151479|14|1|Req INS/Install E25-NUT & ER25-SCREW(C)|Y
01|151479|15|1|Req INS/Install 3/4-KEYSET & A3/8-24|Y
01|151487|3|1|Cable set included with installation|Y
01|151492|2|1|2 port 3000psi rotary union.|Y
01|151501|13|1|Winter Promo 5% has been added to the discount on this|Y
01|151501|13|2|quote.|Y
01|151532|1|1|Stock Tables are Left hand tables|Y
01|151532|1|2|CNCZ100-2W-120LFA|Y
01|151535|1|1|ZKG12-10S-50L   TorqCon Tap Collet|Y
01|151535|1|2|Quoted at NET price.|Y
01|151546|14|1|An additional 10% discount has been applied to the|Y
01|151546|14|2|items on this quotation per our Winter Hardwork Promo!|Y
01|151552|1|1|FLYING FROM FACTORY ON 3/1|Y
01|151570|4|1|Lyndex-Nikken to make the position block|Y
01|151570|4|2|upon receipt of spindle drawing information|Y
01|151573|1|1|H037M6|Y
01|151573|2|1|Adapter plate|Y
01|151573|3|1|M74x1.5 Draw Tube Adapter|Y
01|151573|4|1|Thread draw screw|Y
01|151575|1|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|151579|1|1|With A06B-2235-B000 Alpha 8iS Motor & Special Faceplate|Y
01|151579|2|1|P/N TCD-C4549-R/1 - 10 + 1Port Rotary Union|Y
01|151579|3|1|P/N CST101-135-RJ4 - Tail Support|Y
01|151579|4|1|P/N TCD-37402-R/3 - 4+1 Rotary Union|Y
01|151583|1|1|Replaces S75SF-8-6.00|Y
01|151583|2|1|Replaces S75SF-0250-6.00|Y
01|151584|2|1|5M Cable Set|Y
01|151585|1|1|DEMO UNIT - WH2|Y
01|151585|1|2|Price includes Freight to Alpha Tool & Mold|Y
01|151587|2|1|5M Cable Set|Y
01|151596|11|1|An additional 10% discount has been applied to this|Y
01|151596|11|2|quotation per our Winter Hardwork Promotion.|Y
01|151613|1|1|NCAT40-VC13-90U-IDU-M-DIN|Y
01|151616|10|1|Please Note: Winter promo extra discount 5% has been|Y
01|151616|10|2|added to this quote.|Y
01|151652|1|1|replaces BT40-GSK10-120P|Y
01|151659|3|1|x3 Tailstocks available in 2 Weeks x4 in 4-5 Weeks|Y
01|151665|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|151665|1|2|To be installed with PS-N63AE at the factory|Y
01|151665|2|1|Non-returnable noncancelable|Y
01|151665|2|2|To be installed on NC5-63-SK6C-90 at the factory|Y
01|151668|6|1|Winter Promo 5% added to this quote.|Y
01|151669|1|1|Quoted as NET pricingnon-reurnablenon-cancelable|Y
01|151669|2|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|151669|3|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|151669|4|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|151672|4|1|Winter Promo 5% has been added to this quote.|Y
01|151686|3|1|REPAIR QUOTE CNCZ180LYA-BR SN: 20158|Y
01|151686|3|2|TAR-56288|Y
01|151686|3|3|** IF REPAIR REQUESTED WILL NOT GUARENTEE FACTORY|Y
01|151686|3|4|SPECIFICATIONS DUE TO DAMAGE TO CASTING/SPINDLE **|Y
01|151689|1|1|Reference RGA# TOR-56603|Y
01|151689|1|2|Repair of PRE-PART-05PAN s/n: 7321|Y
01|151689|2|1|LCD screen failure must be replaced.|Y
01|151700|4|1|Winter Promo has been added to discount on this quote.|Y
01|151701|1|1|Arbor screw can be modified to slotted to allow the|Y
01|151701|1|2|coolant to flow into the shell mill must be noted on|Y
01|151701|1|3|the PO at the time of order MOD done at N/C|Y
01|151707|1|1|ref# H037M10|Y
01|151707|1|2|Includes: Std. Soft Jaws with bolts hex wrench|Y
01|151707|1|4|**confirm with the customer if the draw nut is blank|Y
01|151707|1|5|or should be threaded|Y
01|151707|1|6|**Threading available for additional fee|Y
01|151711|2|1|Substitute for C40-4500-EU|Y
01|151711|3|1|Winter Promo 5% added to discount on this quote.|Y
01|151713|1|1|3pcs Minimum Qty|Y
01|151713|1|2|Quote at NET pricing|Y
01|151715|13|1|used with smaller size: TQW-GH06(14x18)|Y
01|151716|2|1|Quoted as alternative for line 1|Y
01|151716|2|2|This has a 5 degree set screw.|Y
01|151727|1|1|P/N: MZQT47-ER32Z-HS2|Y
01|151727|1|2|Mazak Live Z-axis Hor 90deg ER32|Y
01|151727|1|3|184709|Y
01|151731|1|1|Reference RGA# LVR-56543|Y
01|151731|1|2|Repair of 1 x MNL12-SK20X-ICE-10K s/n: 18900510 04|Y
01|151731|1|3|(Mimatic# 184649)|Y
01|151731|2|1|Bearings seals o-rings and 1 SK20 spindle to be|Y
01|151731|2|2|replaced.|Y
01|151731|4|1|Repair of 1 x MNL12-SK20X-ICE-10K s/n: 88700 05|Y
01|151731|4|2|(Mimatic# 184649)|Y
01|151731|5|1|Bearings seals o-rings and 1 SK20 spindle to be|Y
01|151731|5|2|replaced.|Y
01|151736|10|1|Extra 5% Winter Promo discount has been applied|Y
01|151772|1|1|Reference RGA# LVR-56579|Y
01|151772|1|2|Repair of MRAM-MI40L-IC s/n: 92004 01|Y
01|151772|1|3|(Mimatic# 159995)|Y
01|151772|2|1|Bearings seals and  o-rings to be replaced.|Y
01|151772|2|2|Recondition 1 output spindle|Y
01|151772|4|1|Repair of MRAM-EXT-100 s/n: 19900059 02|Y
01|151772|4|2|(Mimatic# 162758)|Y
01|151772|5|1|Bearings seals adn o-rings to be replaced.|Y
01|151776|1|1|Material - WCC Hole Dia - 1.875 Facing Dia - 3.31|Y
01|151776|1|2|Facing depth - .310 Thickness - 5.0 Space - 7.72|Y
01|151776|1|3|Main Body - Nikken Part # CAT50U-AF2-50-OH|Y
01|151776|3|1|Arbor - Nikken Part # BF250-47.6-84.07-127C|Y
01|151776|4|1|Byte - Nikken part # 9BF250-47.6-84.07-127C-I|Y
01|151776|4|2|MOQ = 3 pcs|Y
01|151776|5|1|Insert - Nikken part # AFC-27|Y
01|151776|7|1|Material - WCC Hole Dia - 2.125 Facing Dia - 4.25|Y
01|151776|7|2|Facing depth - .160 Thickness - 5.98 Space - 8.120|Y
01|151776|7|3|Main Body - Nikken part # CAT50U-AF2-70-OH|Y
01|151776|9|1|Arbor - Nikken part # BF270-54-107.95-152C|Y
01|151776|10|1|Byte - Nikken Part # 9BF270-54-107.95-152C -I|Y
01|151776|10|2|MOQ = 3 pcs|Y
01|151776|11|1|Insert - Nikken Part # AFC-35|Y
01|151776|11|2|MOQ = 10 pcs|Y
01|151780|3|1|Min Order Qty: 1-2|Y
01|151780|4|1|Min Order Qty: 3-4|Y
01|151780|5|1|Min Order Qty: 5-9|Y
01|151780|6|1|Min Order Qty: 10+|Y
01|151780|10|1|Min Order Qty: 1-2|Y
01|151780|11|1|Min Order Qty: 3-4|Y
01|151780|12|1|Min Order Qty: 5-9|Y
01|151780|13|1|Min Order Qty: 10+|Y
01|151798|15|1|Closest substitute for the discontinued BT30-MMC8C-75-A|Y
01|151798|18|1|Extra 10% Winter Promo discount applied|Y
01|151810|3|1|Cable Set - Pwr&Feedback|Y
01|151811|1|1|For NIKKEN Factory/ALT for MAZAK HQR250MSY|Y
01|151811|1|2|JPY174800-(EX rate: $1=JPY106)|Y
01|151811|2|1|For NIKKEN Factory/ALT for MAZAK HQR250MSY|Y
01|151811|2|2|JPY192100-(EX rate:$1=JPY106)|Y
01|151811|3|1|For NIKKEN Factory|N
01|151811|3|2|JPY7000-(EX rate:$1=JPY100)|Y
01|151811|4|1|For NIKKEN Factory|N
01|151811|4|2|JPY2120-(EX rate:$1=JPY106)|Y
01|151822|6|1|ST22SC-SK6-97|Y
01|151822|13|1|K5/8CM-MMC4-50|Y
01|151822|14|1|K3/4CM-MMC8-80|Y
01|151822|15|1|K1CM-MMC8-100|Y
01|151822|16|1|K20CM-MMC8-100|Y
01|151822|17|1|K22SC-MMC8-100|Y
01|151822|18|1|K25TG-MMC8C-100|Y
01|151823|1|1|1st Batch|Y
01|151823|2|1|1st Batch|Y
01|151823|3|1|1st Batch|Y
01|151824|1|1|Includes cables.|Y
01|151824|3|1|Includes cables.|Y
01|151828|1|1|Special one time price|Y
01|151828|2|1|Special one time price|Y
01|151828|3|1|Special one time price|Y
01|151828|4|1|12 chuck with adapter plate|Y
01|151834|3|1|Installation includes: Dual axis drive short bar|Y
01|151834|3|2|fiber optic cables communications cables bulkhead|Y
01|151834|3|3|cables external cables parameter changes service|Y
01|151834|3|4|time and travel.|Y
01|151844|2|1|ETA 1 WK after drawings are submitted|Y
01|151850|2|1|MSA1-99585 (Tentative #)|Y
01|151850|2|2|Z-axis Face milling New Capto4 DMG MORI|Y
01|151850|2|3|Internal & External coolant. Max 6000rpm|Y
01|151850|3|1|Max 10000 rpm|Y
01|151850|11|1|Min Order Qty. : 2|Y
01|151850|12|1|Min Order Qty. : 3|Y
01|151850|13|1|Min Order Qty. : 5|Y
01|151850|19|1|Min Order Qty: 1|Y
01|151850|20|1|Min Order Qty: 2|Y
01|151850|21|1|Min Order Qty: 3|Y
01|151850|22|1|Min Order Qty: 5|Y
01|151857|7|1|Includes 2 consectutive 8 hour days of Install/Training|Y
01|151857|8|1|An additional 10% discount has been applied to this|Y
01|151857|8|2|quotation per our Winter Promotion.|Y
01|151858|9|1|Extra 10% Winter Promo discount applied|Y
01|151859|24|1|***Qty should match QTY of HSK63A holders at time of|Y
01|151859|24|2|order*|Y
01|151859|27|1|comes w/ 2pc SF-POT-HSK63 at no charge|Y
01|151859|28|1|comes w/ 3pc SF-POT-HSK63 at no charge|Y
01|151863|3|1|An additional 5% discount has been added to this quote|Y
01|151863|3|2|per our Winter Hardwork Promotion.|Y
01|151870|1|1|Granite Column & Base Interchangeable Spindles|Y
01|151870|1|2|Mechanical Draw Bar Clamping Automated Tool Measurment|Y
01|151870|1|3|Inspection Mode Built-In Post Processor over 50 of|Y
01|151870|1|4|the most popular CNC Posts and Free Software Upgrades|Y
01|151870|1|5|for Life.|Y
01|151870|11|1|Includes 8 Hours of Installation & Training|Y
01|151870|12|1|An additional 10% discount has been applied to this|Y
01|151870|12|2|quotation per our Winter Hardwork Promotion.|Y
01|151878|10|1|MATCHED PRICE TO NON BIG PLUS SINCE WE HAVE THESE|Y
01|151878|10|2|IN STOCK...|Y
01|151879|1|1|Replacement for S1005-0562-7.63|Y
01|151883|1|1|1st Batch|Y
01|151891|1|1|Table + cable only|Y
01|151893|8|1|Optional but highly recommended|Y
01|151893|10|1|10% discount applied for Winter Promo|Y
01|151894|8|1|Optional but highly recommended|Y
01|151894|10|1|10% discount applied for Winter Promo|Y
01|151896|1|1|Page 6|Y
01|151896|2|1|Page 6|Y
01|151896|3|1|Page 12 Hand Load Only because of weight and clearance.|Y
01|151896|5|1|Page 28|Y
01|151898|1|1|G2.5 24000rpm|Y
01|151898|4|1|RPM: Speeds up to 23000 RPM|Y
01|151899|2|1|Stock from Japan to complete order: 1-2 Weeks|Y
01|151920|2|1|4 PORT ROTARY JOINT FOR CNC260|Y
01|151932|4|1|Holds up to 1/4|Y
01|151932|5|1|Holds up to 1/2|Y
01|151932|6|1|Holds up to 3/4|Y
01|151932|11|1|Only FOUR available|Y
01|151932|12|1|Only ONE in available|Y
01|151936|2|1|Extra 5% Winter Promo discount|Y
01|151956|1|1|No old price record|Y
01|151956|2|1|Quoted pre 10/15 price|Y
01|151957|8|1|Promo applies to total quantity quoted.|Y
01|151961|1|1|IT40-NR601-190>>IT40-NR601-200|Y
01|151961|1|2|200MM is shortest GL for IT40. Quoted as standard|Y
01|151961|1|3|pitch=60mm|Y
01|151961|1|4|Quoted as NET pricing non-returnablenn-cancelable|Y
01|151963|3|1|HSK63A-HC32-xxx|Y
01|151963|3|2|HSK63A 32mm Hydraulic Chuck w/ xxxmm gl|Y
01|151963|3|3|*shortest|Y
01|151963|6|1|HSK63A-HC32-125|Y
01|151963|6|2|HSK63A 32mm Hydraulic Chuck w/ 125mm gl|Y
01|151964|3|1|This part number may change once LN Engineering|Y
01|151964|3|2|has received completed Form from enduser|Y
01|151964|4|1|This part number may change once enduser has|Y
01|151964|4|2|completed Engineering Form|Y
01|151994|5|1|Extra 10% Winter Promo.Continuation of order 874382|Y
01|151998|8|1|Winter Promo discount 5% extra added to this quote.|Y
01|151998|8|2|If order is under $500.00 list price discount is 20%.|Y
01|151999|8|1|***GL/CH In.: 2***|Y
01|151999|8|2|**Closeout Promotion! All sales are FINAL!**|Y
01|151999|10|1|***GL/CH In.: 2.5***|Y
01|151999|10|2|** Closeout Promotion! All sales are FINAL!**|Y
01|151999|12|1|***GL/CH In.: 2.5***|Y
01|151999|12|2|**Closeout Promotion! All sales are FINAL!**|Y
01|151999|18|1|***Drawing attached for review/approval***|Y
01|151999|18|2|***Please confirm for Brother Machine with EU***|Y
01|152002|3|1|Schunk vise + jaws + adapter plate|Y
01|152003|4|1|Min Order Qty: 1-4|Y
01|152003|5|1|Min Order Qty: 5-9|Y
01|152003|6|1|Min Order Qty: 10+|Y
01|152003|11|1|Min Order Qty: 1-4|Y
01|152011|2|1|Quoted at NET pricing.|Y
01|152014|3|1|The RT-ACCESSORY is for the interface + external cables|Y
01|152020|1|1|Includes HAAS Motor and cable set|Y
01|152020|1|2|App needs to be bought from HAAS Machine Tools|Y
01|152023|2|1|BT30-SF3-90|Y
01|152023|2|2|BT30 3mm Shrink Fit w/ 90mm GL|Y
01|152023|5|1|BT30-SF3-100|Y
01|152023|5|2|BT30 3mm Shrink Fit w/ 100mm GL|Y
01|152023|8|1|BT30-SF6-90CP|Y
01|152023|8|2|BT30 6mm Shrink Fit w/ 90mm GL and coolant ports|Y
01|152023|14|1|BT30-SF6-100CP|Y
01|152023|14|2|BT30 6mm Shrink Fit w/ 100mm GL and coolant ports|Y
01|152023|17|1|BT30-SF8-90CP|Y
01|152023|17|2|BT30 8mm Shrink Fit w/ 90mm Gl and coolant ports|Y
01|152023|20|1|BT30-SF8-100CP|Y
01|152023|20|2|BT30 8mm Shrink Fit w/ 100mm Gl and coolant ports|Y
01|152023|23|1|BT30-SF10-90CP|Y
01|152023|23|2|BT30 10mm Shrink Fit w/ 90mm Gl and coolant ports|Y
01|152023|26|1|BT30-SF10-100CP|Y
01|152023|26|2|BT30 10mm Shrink Fit w/ 100mm Gl and coolant ports|Y
01|152023|29|1|BT30-SF12-90CP|Y
01|152023|29|2|BT30 10mm Shrink Fit w/ 90mm Gl and coolant ports|Y
01|152023|32|1|BT30-SF12-100CP|Y
01|152023|32|2|BT30 12mm Shrink Fit w/ 100mm Gl and coolant ports|Y
01|152023|39|1|NBT30-SF6-90CP|Y
01|152023|39|2|Taper Plus BT30 6mm Shrink Fit w/ 90mm GL and|Y
01|152023|39|3|coolant ports|Y
01|152023|40|1|NBT30-SF8-90CP|Y
01|152023|40|2|Taper Plus BT30 8mm Shrink Fit w/ 90mm GL and|Y
01|152023|40|3|and coolant ports|Y
01|152023|41|1|NBT30-SF10-90CP|Y
01|152023|41|2|Taper Plus BT30 10mm Shrink Fit w/ 90mm GL and|Y
01|152023|41|3|and coolant ports|Y
01|152023|42|1|NBT30-SF12-90CP|Y
01|152023|42|2|Taper Plus BT30 12mm Shrink Fit w/ 90mm GL and|Y
01|152023|42|3|and coolant ports|Y
01|152025|2|1|offered as in stock option|Y
01|152027|3|1|Winter Promo extra discount 5% added to the quote.|Y
01|152027|3|2|If order is under $500.00 list discount will be 28%.|Y
01|152029|9|1|Winter Promo extra discount has been added to this|Y
01|152029|9|2|quote.|Y
01|152046|4|1|Can be used as standard as long as the cutter is not|Y
01|152046|4|2|4mm diameter or smaller|Y
01|152052|1|1|DISCONTINUED|Y
01|152064|1|1|Final Part Number = C5001-1500-2.00CP-IDI|Y
01|152064|3|1|Mod includes = Chip hole installation & re-balance|Y
01|152072|1|1|installed w/ PS-N46E at factory|Y
01|152072|2|1|installed on NC5-46-C20-120P at factory|Y
01|152075|6|1|ST22SC-SK6-97|Y
01|152075|13|1|K5/8CM-MMC4-50|Y
01|152075|14|1|K3/4CM-MMC8-80|Y
01|152075|15|1|K1CM-MMC8-100|Y
01|152075|16|1|K20CM-MMC8-100|Y
01|152075|17|1|K22SC-MMC8-100|Y
01|152075|18|1|K25TG-MMC8C-100|Y
01|152079|6|1|ST22SC-SK6-97|Y
01|152079|13|1|K5/8CM-MMC4-50|Y
01|152079|14|1|K3/4CM-MMC8-80|Y
01|152079|15|1|K1CM-MMC8-100|Y
01|152079|16|1|K20CM-MMC8-100|Y
01|152079|17|1|K22SC-MMC8-100|Y
01|152079|18|1|K25TG-MMC8C-100|Y
01|152080|6|1|ST22SC-SK6-97|Y
01|152080|13|1|K5/8CM-MMC4-50|Y
01|152080|14|1|K3/4CM-MMC8-80|Y
01|152080|15|1|K1CM-MMC8-100|Y
01|152080|16|1|K20CM-MMC8-100|Y
01|152080|17|1|K22SC-MMC8-100|Y
01|152080|18|1|K25TG-MMC8C-100|Y
01|152083|2|1|Installation includes: External cables and parmeter|Y
01|152083|2|2|changes.|Y
01|152087|1|1|HSK50A-HC25-120|Y
01|152087|1|2|Non-returnable non-cancelable|Y
01|152092|1|1|1 PC ETA 2 WKSBalance ETA 11-12 WKS|Y
01|152093|6|1|ST22SC-SK6-97|Y
01|152093|13|1|K5/8CM-MMC4-50|Y
01|152093|14|1|K3/4CM-MMC8-80|Y
01|152093|15|1|K1CM-MMC8-100|Y
01|152093|16|1|K20CM-MMC8-100|Y
01|152093|17|1|K22SC-MMC8-100|Y
01|152093|18|1|K25TG-MMC8C-100|Y
01|152094|1|1|Wrenches included with Live Tool|Y
01|152112|2|1|A2-5 Adapter Plate for H011MC8 (HW-08C-DOD)|Y
01|152112|2|2|This is a Non-Cancelable Non-Returnable item.|Y
01|152115|1|1|NET PRICING ON THESE TOOLS|Y
01|152140|2|1|Requires HYD-UNIT-NACHI-AC110V Hydraulic Unit|Y
01|152140|3|1|Requires HYD-UNIT-NACHI-AC110V Hydraulic Unit|Y
01|152141|1|1|Reference RGA# LVR-56548|Y
01|152141|1|2|Repair of NK103-12000 s/n: AL0025 (Alps# NK103-12000)|Y
01|152141|2|1|Bearings o-rings collet nut and spindle to be|Y
01|152141|2|2|replaced.|Y
01|152142|1|1|Wrenches included with Live Tool|Y
01|152142|3|1|Winter Promo 10% extra has been added to the discount.|Y
01|152143|51|1|Quoted instead of -75. 75 is a special with higher cost|Y
01|152147|48|1|replaces C4016-0187-4.00|Y
01|152147|52|1|replaces C4016-0375-4.00|Y
01|152147|54|1|replaces C4016-0500-4.00|Y
01|152151|1|1|INS/1st batch-Rev*|Y
01|152151|1|2|*Changed KeyHoles dia/location to match OSAWA|Y
01|152155|7|1|Winter Promo 5% added to discount on this quote.|Y
01|152155|7|2|Must maintain a minimum order of $500.00 list price.|Y
01|152169|2|1|Heidenhain Rotary Scale Kit|Y
01|152169|4|1|Cable Set|Y
01|152171|8|1|Extra 5% Winter Promo discount|Y
01|152176|1|1|Replacement for C4001-1000-1.75|Y
01|152178|3|1|Winter promo 5% added to discount on this quote.|Y
01|152180|1|1|Must order by 3/3/21 for next air shipment.|Y
01|152192|5|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|152192|5|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|152192|5|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|152192|5|4|TRAVEL.|Y
01|152192|6|1|SHIPPING TO|Y
01|152192|6|2|813 IRVING WICK DR W BLDG|Y
01|152192|6|3|HORTON HEATH OH 43056-6116|Y
01|152196|1|1|Quoted at NET pricing.|Y
01|152198|3|1|Labor to replace motors and adjust backlash on two|Y
01|152198|3|2|tables.|Y
01|152203|2|1|in stock substitute offering at same NET price|Y
01|152203|3|1|in stock substitute offering at same NET price|Y
01|152207|4|1|Installation includes: drive unit short bar fiber|Y
01|152207|4|2|optic cables communication cables bulk head cable|Y
01|152207|4|3|set external cable set parameter changes service|Y
01|152207|4|4|time and travel.|Y
01|152212|1|1|Includes 200mm Faceplate.|Y
01|152224|1|1|NBT30-SF10-90CP|Y
01|152224|2|1|NBT30-SF12-75CP|Y
01|152224|3|1|NBT30-SF15-60CP|Y
01|152224|4|1|NBT30-SF16-60CP|Y
01|152224|5|1|NBT30-SF16-75CP|Y
01|152224|6|1|NBT30-SF22-45CP|Y
01|152224|7|1|NBT30-SF22-75CP|Y
01|152224|7|2|MOQ is 10pcs|Y
01|152224|8|1|NBT30-SF4.5-60|Y
01|152224|9|1|NBT30-SF4-60|Y
01|152224|10|1|NBT30-SF6-90|Y
01|152224|11|1|NBT30-SF7-60|Y
01|152224|12|1|NBT30-SF8-60CP|Y
01|152224|13|1|HSK63A-SF10-90|Y
01|152224|13|2|MOQ is 10pcs|Y
01|152224|14|1|HSK63A-SF16-75|Y
01|152224|14|2|MOQ is 10pcs|Y
01|152224|15|1|H63A-SF25-75|Y
01|152224|15|2|MOQ is 10pcs|Y
01|152224|16|1|NBT30-SF25-90CP|Y
01|152226|1|1|P/N HSK63A-HC32-100 - 100mm Gage length w/o Adj screw|Y
01|152226|2|1|HSK63A-HC1250-126 - 126mm Gage Length|Y
01|152231|1|1|P/N HSK63A-HC32-125 - 125mm Gage length with Adj screw|Y
01|152231|3|1|2-1/2 Diameter x 13 Gage length|Y
01|152239|2|1|Installation includes: drive unit short bar fiber|Y
01|152239|2|2|optic cables communication cables bulk head cable|Y
01|152239|2|3|set external cable set parameter changes service|Y
01|152239|2|4|time and travel.|Y
01|152239|2|5|(If existing equipment can be salvaged from previous|Y
01|152239|2|6|DuraCenter installation credit can be issued in the|Y
01|152239|2|7|form of tooling.)|Y
01|152241|6|1|Includes (8) consectutive hours of Installation and|Y
01|152241|6|2|Training.|Y
01|152241|7|1|An additional 10% discount has been applied to the|Y
01|152241|7|2|items on this quotation per our Winter Hardwork Promo.|Y
01|152246|11|1|Includes (2) consectutive 8 hour days of Installation|Y
01|152246|11|2|and Training.|Y
01|152246|12|1|A 10% discount has been applied per our Winter Promo.|Y
01|152265|1|1|TCE-98818|Y
01|152275|1|1|Password protect the part list and operation list|Y
01|152275|1|2|screens.|Y
01|152275|1|3|The max part count allowed to be entered is determined|Y
01|152275|1|4|by the part number selected.|Y
01|152275|1|5|Example: Part Alpha can have 1-10 parts per cartridge.|Y
01|152275|1|6|Part Bravo can have 1-4 parts per cartridge.|Y
01|152275|1|7|Part status on the tower will update immediately|Y
01|152275|1|8|instead of waiting for the next tower rotation.|Y
01|152279|7|1|Please Note: Winter promo has been applied to this|Y
01|152279|7|2|quote extra 10% for orders over $5000.00 list.|Y
01|152282|3|1|Extra 5% Winter Promo discount applied|Y
01|152285|6|1|Winter Promo 5% has been added to the discount on this|Y
01|152285|6|2|quote.|Y
01|152289|1|1|Tooling Certificate # 25000-2819-121820|Y
01|152303|1|1|5AX-130YA SN: 5438 TAR-56537|Y
01|152303|1|2|Worn Seal on the Rotary Axis Caused Oil to go into|Y
01|152303|1|3|Rotary Side Gearbox.  Seals replaced and New Rotary|Y
01|152303|1|4|Side Motor|Y
01|152306|1|1|Same as NKA01-13000 but has a Hex Nut instead of Round|Y
01|152306|1|2|Nut with Spanner Slots.|Y
01|152306|4|1|An additional 5% discount has been applied per our|Y
01|152306|4|2|Winter Hardwork Promo.|Y
01|152310|1|1|Please note: NET price quoted once these tools are|Y
01|152310|1|2|ordered they cannot be cancelled or returned.|Y
01|152310|46|1|Winter Promo 10% added to quote.|Y
01|152311|1|1|Part# / Pending(PRE-ADPT-I50-1.3/8A?)|Y
01|152311|2|1|Part# / Pending(PRE-ADPT-I50-1.1/16A?)|Y
01|152311|3|1|Part# / Pending(PRE-ADPT-I50-7/8A?)|Y
01|152313|1|1|1st Batch|Y
01|152313|2|1|1st Batch/SP|Y
01|152313|3|1|Req INS/Install A1/2-20 & 1-KEYSET|Y
01|152313|4|1|Req INS/Install A1/2-20 & 1-KEYSET|Y
01|152319|3|1|HSK63A Blank Bar x 14in w/ID Chip Hole|Y
01|152319|3|2|HSK63A-Blank-14.00|Y
01|152329|4|1|Requires riser plate to match center height of table|Y
01|152333|5|1|HSK100A-SK16C-200P (High-Speed)|Y
01|152352|2|1|H100A-SF0250-8.00|Y
01|152364|4|1|5% price break applied|Y
01|152378|3|1|Winter Promo 5% extra discount has been added to this|Y
01|152378|3|2|quote.|Y
01|152386|3|1|PROMO LIST PRICE ABOVE $500 FOR AN EXTRA 5%|Y
01|152389|2|1|Extra 5% WInter Promo discount applied|Y
01|152392|1|1|ETA 3/15 week if PO submitted by 3/9|Y
01|152396|1|1|Reference RGA# TOR-56615|Y
01|152396|1|2|Repair of C5005-0562-5.02|Y
01|152396|9|1|Regreasing included|Y
01|152399|1|1|MOTOR NOT INLCUDED!!|Y
01|152399|1|2|The motor is no longer available to Lyndex-Nikken|Y
01|152401|1|1|PART # TCE-98818|Y
01|152415|2|1|Same item New part #|Y
01|152415|2|2|Balance of 2ea due 6/15 week|Y
01|152415|15|1|Extra 10% Winter Promo discount applied|Y
01|152440|1|1|Alps P/N: AC4-DRMS100-45000|Y
01|152440|1|2|Capto 4 tool|Y
01|152441|10|1|5% ADDITIONAL DISCOUNT FOR OVER $500 LIST PRICE|Y
01|152442|10|1|NOSE DIAMETER = .35 UPPER DIAMETER = .87|Y
01|152442|11|1|STANDARD DIMENSIONS|Y
01|152442|12|1|STANDARD DIMENSIONS|Y
01|152442|14|1|NOSE DIAMETER = .787 & 3.754 LONG @ THAT SIZE|Y
01|152442|14|2|BEFORE GETTING LARGER TOWARD FLANGE.|Y
01|152442|16|1|STANDARD DIMENSIONS|Y
01|152442|17|1|STANDARD DIMENSIONS|Y
01|152450|3|1|Please Note: We had a price increase in October. I|Y
01|152450|3|2|have added the Winter Promo 5% extra discount to this|Y
01|152450|3|3|quote.|Y
01|152455|1|1|Includes (2)SF-POT-HSK63 Chucks/Pots for HSK63 Holders|Y
01|152477|1|1|Req INS/Install A1/2-20 & 1-KEYSET|Y
01|152477|2|1|Req INS/Install A1/2-20 & 1-KEYSET|Y
01|152480|1|1|HSK100A-ER32-4.72|Y
01|152483|2|1|MSA1-99584 (Tentative #)|Y
01|152483|2|2|X-axis Face milling New Capto4 DMG MORI|Y
01|152483|2|3|Internal & External coolant|Y
01|152483|3|1|MSA1-99585 (Tentative #)|Y
01|152483|3|2|Z-axis Face milling New Capto4 DMG MORI|Y
01|152483|3|3|Internal & External coolant|Y
01|152487|2|1|A2-5 Adapter Plate for H011MC8 (HW-08C-DOD)|Y
01|152487|2|2|This is a Non-Cancelable Non-Returnable item.|Y
01|152495|1|1|Reference RGA# TOR-56628|Y
01|152495|1|2|Repair of CAT40-UMT200UW|Y
01|152495|4|1|Calibration service included.|Y
01|152504|6|1|C5007-0040-8.00(Substitute CAT50-ER40-8.00 & SWAP NUT)|N
01|152505|2|1|Base Only - Heads sold separate|Y
01|152505|3|1|#30 taper|Y
01|152505|4|1|#40 taper|Y
01|152505|5|1|#50 taper|Y
01|152505|8|1|*only for #30 taper|Y
01|152505|9|1|*only for #40 taper|Y
01|152505|10|1|*only for #50 taper|Y
01|152511|2|1|NO COOLANT THRU UNLESS ROUTED THROUGH POSITIONING PIN|Y
01|152511|3|1|COOLANT STRAIGHT THRU THE SPINDLE|Y
01|152511|5|1|EXTERNAL COOLANT|Y
01|152511|6|1|EXTERNAL COOLANT|Y
01|152511|7|1|INTERNAL COOLANT|Y
01|152511|18|1|NET CHARGE; SPINDLE FACE MEASUREMENTS REQUIRED|Y
01|152516|7|1|Winter Promo 5% extra added to discount on this quote.|Y
01|152520|7|1|Winter Promo 5% extra added to discount on this quote.|Y
01|152526|18|1|OVER $5K LIST PRICE QUALIFIES FOR EXTRA 10% DISCOUNT|Y
01|152531|1|1|Reference RGA# LVR-56639|Y
01|152531|1|2|Repair of T32005 s/n: A0274 (Alps# T32005)|Y
01|152531|2|1|Bearings o-rings collet nut and spindle to be|Y
01|152531|2|2|replaced.|Y
01|152531|4|1|Repair of T32005 s/n: A0280 (Alps# T32005)|Y
01|152531|5|1|Bearings o-rings collet nut drive shaft and gears|Y
01|152531|5|2|to be replaced.|Y
01|152541|3|1|special item non-cancelable/non-returnable|Y
01|152543|1|1|HSK100A-SM1500-3.00?\|Y
01|152543|1|2|UNV#5006 - HSK100A 1.1/2 Shell mill holders 3 GL|Y
01|152551|4|1|P/N:  E32-XXX(C)|Y
01|152551|4|2|ER32 3mm Collet|Y
01|152551|5|1|P/N: E20-XXX(C)|Y
01|152551|5|2|ER20 3mm coolant collet|Y
01|152558|13|1|An additional 5% discount will be applied for orders|Y
01|152558|13|2|over $500 and 10% for orders over $5000 list price.|Y
01|152573|6|1|EXTERNAL POWER/FEEDBACK CABLES 4TH/5TH AXES|Y
01|152573|7|1|HYDRAULIC MANIFOLDS PRESSURE REGULATORS FOR AIR/HYD|Y
01|152573|9|1|FREE TOOL CERT FROM LYNDEX NIKKEN FOR (2) 5AX-201|Y
01|152573|15|1|MOTOR FOR RTP#9048 S/N: 5735 5AX-130YA-M|Y
01|152573|15|2|THIS WILL NEGATE INVOICE #2278261|Y
01|152573|15|3|DO NOT SHIP ANOTHER MOTOR!!!|Y
01|152581|1|1|Lyndex Nikken Part # MZMP47-ER32X-OFF-HS2|Y
01|152581|1|2|Mazak LIve; VDI40 ER32 Offset|Y
01|152585|1|1|Non stock standard itemnot cancelable nor returnable|Y
01|152590|1|1|HSK100A-SM1500-3.00?|Y
01|152590|1|2|UNV#5006 - HSK100A 1.1/2 Shell mill holders 3 GL|Y
01|152597|1|1|1st Batch/Give to Tim for INS|Y
01|152597|2|1|1st Batch/Give to Tim for INS|Y
01|152603|3|1|This item is non standard stock. Once a purchase order|Y
01|152603|3|2|is placed it cannot be cancelled or returned.|Y
01|152613|1|1|REPAIR QUOTE FOR 5AX-130BAYA-BR SN: 1735|Y
01|152613|1|2|TAR-56458|Y
01|152621|1|1|Coolant Port Plugs included|Y
01|152628|2|1|MSA1-99585 (Tentative #)|Y
01|152628|2|2|Z-axis Face milling New Capto4 DMG MORI|Y
01|152628|2|3|Internal & External coolant. Max 6000rpm|Y
01|152628|3|1|Max 10000 rpm|Y
01|152628|4|1|Max 6000rpm|Y
01|152628|11|1|Min Order Qty. : 2|Y
01|152628|12|1|Min Order Qty. : 3|Y
01|152628|13|1|Min Order Qty. : 5|Y
01|152639|1|1|P-12 o-ring installed|Y
01|152649|1|1|HSK63A Back Spot Facing tool|Y
01|152649|1|2|Material is 7075-T651 aluminum in T73 condition|Y
01|152649|1|3|d is .218-.226 D is .455-.465 T is .5 h is 2.5|Y
01|152656|2|1|CAT40-HC12-80|Y
01|152656|2|2|CAT40 12mm Hyd. Chuck GL 80mm w/ Din Hole|Y
01|152656|3|1|CAT40-HC14-80|Y
01|152656|3|2|CAT40 14mm Hyd. Chuck GL 80mm w/ Din Hole|Y
01|152656|4|1|CAT40-HC16-80|Y
01|152656|4|2|CAT40 16mm Hyd. Chuck GL 80mm w/ Din Hole|Y
01|152656|5|1|CAT40-HC20-82|Y
01|152656|5|2|CAT40 20mm Hyd. Chuck GL 82mm w/ Din Hole|Y
01|152656|9|1|Modification fee for Make a Din Hole|Y
01|152658|3|1|Once the modification is made this item cannot be|Y
01|152658|3|2|canceled or returned.|Y
01|152658|3|3|Please order part # C5007-0040-12.00DIN-M|Y
01|152658|7|1|Once the modification is made this item cannot be|Y
01|152658|7|2|canceled or returned.|Y
01|152658|7|3|Please order part # C5007-0032-12.00DIN-M|Y
01|152659|3|1|EXTERNAL POWER CABLE|Y
01|152659|3|2|EXTERNAL FEEDBACK CABLE|Y
01|152659|4|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|152659|4|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|152659|4|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|152659|4|4|TRAVEL.|Y
01|152703|1|1|Reference RGA# TOR-56643|Y
01|152703|1|2|Repair of S1205-0562-8.13|Y
01|152703|3|1|Regreasing service included|Y
01|152707|59|1|Scale + Scale mount kit net price per axis|Y
01|152737|1|1|Table will be set up for Hyd Brake|Y
01|152737|5|1|Surcharge for braided stainless cables|Y
01|152748|2|1|Installation includes: Drive unit short bar fiber|Y
01|152748|2|2|optic cable communications cable bulkhead cables|Y
01|152748|2|3|external cables parameter changes service time and|Y
01|152748|2|4|travel.|Y
01|152751|2|1|Rigging to and from CNC Solutions with run off.|Y
01|152751|3|1|Run off at DRG|Y
01|152765|5|1|Winter promo 5% extra discount added to this quote.|Y
01|152772|1|1|1st Batch/for stock|Y
01|152782|4|1|Winter Promo 5% extra added to discount on this quote.|Y
01|152799|2|1|Winter promo 5% extra discount added to this quote.|Y
01|152810|4|1|will need to swap solid nut for High torque BEaring nut|Y
01|152828|6|1|This extra 10% discount is if they order both tools|Y
01|152837|6|1|Replaces discontinued part #SKN-6WB(GH)|Y
01|152839|7|1|Please Note: Winter promo 10% extra discount has been|Y
01|152839|7|2|added to this quote.|Y
01|152848|4|1|ANGULAR POSITION COMPARATORS|Y
01|152848|6|1|E46LTW WITH BMT55 SPINDLE|Y
01|152848|7|1|ANGULAR POSITION COMPARATORS|Y
01|152851|4|1|MZQT47-ER32Z-OFF-SUB-ICE|Y
01|152851|4|2|Mazak Live Z-Axis 90-Degree ER32 Offset SUB (H-Type)|Y
01|152851|4|3|ICE|Y
01|152857|3|1|Installation includes: Drive unit short bar fiber|Y
01|152857|3|2|optic cable communications cable bulkhead cables|Y
01|152857|3|3|external cables parameter changes service time and|Y
01|152857|3|4|travel.|Y
01|152860|3|1|Mimatic# 167514|Y
01|152860|3|2|Mazak Live Tool for MTX6300|Y
01|152860|3|3|Backset H-Type Version w/ ER25 output|Y
01|152860|3|4|Gear ratio  1: 2.68|Y
01|152863|6|1|Additional 5% applied for Promo|Y
01|152864|1|1|Non standard stock item not cancelable nor returnable|Y
01|152866|9|1|INCLUDES INSTALLATION AND TRAINING EQUALLING A|Y
01|152866|9|2|A TOTAL OF 16 HOURS|Y
01|152872|1|1|Tooling Certificate Number: 25000-2819-121820|Y
01|152873|2|1|Includes (2) SF-POT-#40 CAT40 Pot/Chuck Holders|Y
01|152873|4|1|An additional 10% has been applied per our current|Y
01|152873|4|2|Winter Promotion.|Y
01|152874|1|1|Part# / Pending(PRE-ADPT-I50-1.3/8A?)|Y
01|152874|2|1|Part# / Pending(PRE-ADPT-I50-1.1/16A?)|Y
01|152874|3|1|Part# / Pending(PRE-ADPT-I50-7/8A?)|Y
01|152876|1|1|Tooling Certificate Number: 13485-2876-021521|Y
01|152876|1|2|Tooling Certificate Number: 13485-2877-021521|Y
01|152879|3|1|Same day courier shipment|Y
01|152882|1|1|Installed with retention knob PS-N46AE at factory|Y
01|152882|2|1|Installed on NC5-46-C20-80 at factory|Y
01|152886|1|1|Reference RGA# TOR-56696|Y
01|152886|1|2|Repair of PF-2|Y
01|152886|4|1|Calibration service included.|Y
01|152903|1|1|Discount reflects a purchase order of 1-pc.|Y
01|152903|2|1|Discount reflects a purchase order of 2-pcs.|Y
01|152905|1|1|Replaces part #SKN-6WBJ(GH) which is a discontinued #|Y
01|152918|1|1|One time special price for show table.|Y
01|152919|5|1|Northfield 16C collet closer with adapter and rotary|Y
01|152919|5|2|union.|Y
01|152922|1|1|BT50-SCA22-135|Y
01|152922|1|2|Nikken 22mm Stub Mill Arbor w/ 135mm projection|Y
01|152955|2|1|Please order this as part # CAT50-C1.1/4F-165U-IDU-M|Y
01|152955|2|2|Net price $517.84|Y
01|152959|1|1|CAT50 3/8 Shrink Fit Holder ID Chip Hole GKN UNV#214|Y
01|152959|1|2|Balanceable. C5006-0375-3.375-ID-GKN|Y
01|152968|2|1|QUOTED AT NET PRICE|Y
01|152969|1|1|Reference RGA# CUR-56503|Y
01|152969|1|2|Repair of C40RA-0025M s/n: 4992803 (Mimatic# 175241)|Y
01|152969|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|152969|2|2|1 input & 1 output spindle|Y
01|152973|1|1|Req INS/For stock|Y
01|152981|6|1|An additional 5% has been applied per our Winter|Y
01|152981|6|2|Hardwork Promotion.|Y
01|152984|10|1|An additional 10% discount has been applied per our|Y
01|152984|10|2|Spring Hardwork Promotion.|Y
01|152986|1|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|152986|1|2|QUOTED with NO makino pins|Y
01|152986|2|1|THESE ARE QUOTED WITH MAKINO PINS|Y
01|152986|2|2|Quoted as NET pricingnon-returnablenon-cancelabble|Y
01|152986|2|3|Part# HSK63F/LPM-C1.1/4-110G|Y
01|152997|3|1|Tilt axis Heidenhain cable|Y
01|152997|6|1|Rotary axis Heidenhain cable|Y
01|153007|1|1|Includes Haas motor and cable set.|Y
01|153016|1|1|Tooling Certificate Number: 13435-2615-032020|Y
01|153023|1|1|Tooling Certificate Number:|Y
01|153023|1|2|25000-2968-051421|Y
01|153028|5|1|Northfield 16C collet closer with adapter and rotary|Y
01|153028|5|2|union.|Y
01|153030|1|1|Non standard stock item not cancelable nor returnable|Y
01|153039|6|1|C5007-0040-8.00(Substitute CAT50-ER40-8.00 & SWAP NUT)|N
01|153040|6|1|C5007-0040-8.00(Substitute CAT50-ER40-8.00 & SWAP NUT)|N
01|153041|1|1|3 pcs of screw M5XL16 included.|Y
01|153052|1|1|Coolant Port Plugs included|Y
01|153066|5|1|Extra 10% Winter Promo discount applied|Y
01|153068|1|1|3/4 option offered in place of 5/8 we don't offer|Y
01|153068|1|2|If a collet is needed let me know shank diameter and|Y
01|153068|1|3|I will quote it for you|Y
01|153076|7|1|better lead than CP version|Y
01|153076|9|1|Extra 5% promo discount added|Y
01|153077|1|1|P/N: HSK40E-SM22-50CP|Y
01|153077|1|2|HSK40E Taper 22mm arbor  50mm gage length coolant port|Y
01|153081|1|1|Qty of 6-12 pcs will receive extra 5% disc as applied|Y
01|153082|1|1|Tailstock modification|Y
01|153093|3|1|1/8 Jobbers Drill - .1255 Reamer - #31 Jobbers Drill|Y
01|153093|4|1|.0660 Reamer|Y
01|153093|5|1|#52 Jobbers Drill Shank .0635|Y
01|153098|3|1|This item is not returnable.|Y
01|153102|7|1|Promo Ends 3/31/2021|Y
01|153104|4|1|NET PRICE|Y
01|153105|1|1|1st Batch|Y
01|153111|7|1|Promo Ends 3/31/2021|Y
01|153113|17|1|An additional 10% discount has been applied per our|Y
01|153113|17|2|Winter Hardwork Promotion.|Y
01|153116|6|1|Promo Ends 3/31/2021|Y
01|153119|1|1|5 Port Rotary Union - 3 Hyd & 2 Air - 2000 max PSI|Y
01|153121|1|1|44 In Stock|Y
01|153123|1|1|Reference RGA# LVR-56693|Y
01|153123|1|2|Repair of NK103-12000 s/n: AL0031 (Alps# NK103-12002)|Y
01|153123|2|1|Bearings o-rings collet nut and spindle to be|Y
01|153123|2|2|replaced.|Y
01|153139|1|1|C6 Blank Bar P/N: TBD|Y
01|153139|1|2|Ref: CPT.63.95.D130BL|Y
01|153149|2|1|PMK12-5|Y
01|153149|4|1|PMK12-8|Y
01|153157|4|1|An additional 5% discount has been applied to the items|Y
01|153157|4|2|on this quotation per our Winter Hardwork Promotion.|Y
01|153159|19|1|A 5% discount has been applied to the Collet Chucks|Y
01|153159|19|2|and 15% on the QCFC Collets.|Y
01|153167|6|1|Winter promo has been added to discount on this quote.|Y
01|153170|4|1|Extra 5% Winter Promo discount|Y
01|153173|10|1|An additional 5% discount has been applied to these|Y
01|153173|10|2|items per our Spring Promo.|Y
01|153175|9|1|Winter promo has been added to discount on this quote.|Y
01|153204|5|1|An additional 5% discount has been applied to this|Y
01|153204|5|2|quote per our Winter Hardwork Promo.|Y
01|153213|1|1|** Draw nut supplied w/out thread|Y
01|153213|2|1|#4 Draw Screw for HW-08-HS/H037M8|Y
01|153213|3|1|#5 Retainer for HW-08-HS/H037M8|Y
01|153221|6|1|2 Piece Steel Black Oxided Sub Plates|Y
01|153221|7|1|Ellison to mount Rotary/Tailsock/Sub Plate Assembly|Y
01|153221|7|2|Lyndex-Nikken to perform Installation to machine contro|Y
01|153233|1|1|This holder is considered special once ordered it|Y
01|153233|1|2|cannot be canceled or returned.|Y
01|153240|1|1|TAR-56641 CNCZ202FA SN: 20013T|Y
01|153243|2|1|Stallion 5/18 - Trunnion table from class 35 cast iron|Y
01|153243|2|2|guaranteed flat within .001 per 18. Heavy Duty fully|Y
01|153243|2|3|ribbed casting complete with outboard support and|Y
01|153243|2|4|Faceplate mounting to Rotary Table. The Drop below|Y
01|153243|2|5|Center is 1.50.|Y
01|153246|1|1|SENT IN CONTROLLERS FOR CNC202AA21 SN: 26411TC/26276TC|Y
01|153246|1|2|CTRL SN: F014Z9402960014/F014Y8311930024|Y
01|153246|1|3|4001 ALARM - NEED TO RESET CONTROLLER AND INPUT PRMS|Y
01|153263|1|1|** Draw nut supplied w/out thread|Y
01|153263|1|2|Additional cost for threading|Y
01|153268|5|1|Quoted at Net price each for C5007-0032-4.00|Y
01|153268|5|2|C5007-0040-4.00 and C5006-1000-4.00DIN-M|Y
01|153274|1|1|1st Batch|Y
01|153274|2|1|1st Batch|Y
01|153276|1|1|Delivery Ship 2 Weeks A.R.O|Y
01|153276|3|1|Custom WorkHolding - Pneumatic ID Gripping|Y
01|153278|1|1|NO QUOTE NO LONGER AVAILABLE.|Y
01|153278|1|2|SEE ITEM BELOW FOR ALTERNATIVE|Y
01|153295|1|1|Quoted as NET pricing non-returnable non-cancellable|Y
01|153295|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|153295|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|153295|7|1|Quoted as NET pricingnon-returnablenon=cancelable|Y
01|153295|10|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|153295|11|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|153302|2|1|An additional 5% has been applied per our Winter Promo!|Y
01|153304|2|1|ETA 04/26|Y
01|153308|2|1|Extra 5% promo discount applied|Y
01|153309|1|1|Reference RGA# TOR-56563|Y
01|153309|1|2|Repair of SF-FI5-UNIT-200 s/n: 5J012|Y
01|153313|1|1|Sigma 5 replacement for SN: 2038|Y
01|153317|1|1|**|Y
01|153319|13|1|ADDITIONAL 10% DISCOUNT FOR TOTAL BEING OVER 10K LIST|Y
01|153320|1|1|Reference RGA# LVR-56701|Y
01|153320|1|2|Repair of MNL12-ER32X s/n: A2415 (Alps# T32206)|Y
01|153320|2|1|Bearings o-rings seals collet nut and spindle to be|Y
01|153320|2|2|replaced.|Y
01|153320|4|1|Repair of MSL12-ARH12-C-0.7MP s/n: A0031 (Alps# T32334)|Y
01|153320|5|1|Bearings o-rings seals and spindle to be replaced.|Y
01|153327|1|1|NC5-63-C16-70|Y
01|153327|1|2|installed with PS-N63AE at factory|Y
01|153327|2|1|installed on NC5-63-C16-70|Y
01|153332|1|1|Tooling Certificate Number:|Y
01|153333|1|1|NCAT40-SF16-80CP|Y
01|153335|1|1|Discount reflects a purchase order of 1~4 toolholders.|Y
01|153335|3|1|Discount reflects a purchase order of 5~10 toolholders.|Y
01|153341|1|1|MNL12-ER20Z-MSQ Mori Live Tool ER20 90-Degree: Main|Y
01|153341|1|2|Sub & Quad Output >>RPM 10000|Y
01|153341|1|3|Quoted at NET Price.|Y
01|153341|2|1|MNL12-ER20Z-MSQ Mori Live Tool ER20 90-Degree: Main|Y
01|153341|2|2|Sub & Quad Output >>RPM 10000|Y
01|153341|2|3|Quoted at NET Price.|Y
01|153342|1|1|HSK160B-SM1250-3.00|Y
01|153343|2|1|Alternative|Y
01|153351|2|1|Haas installation.|Y
01|153388|1|1|Includes Wrench and Spindle Stop Block|Y
01|153392|9|1|An additional 5% Discount has been applied per our|Y
01|153392|9|2|Winter Hardwork Promo.|Y
01|153399|1|1|Without Base plate|Y
01|153399|2|1|Without Base plate|Y
01|153400|1|1|1st Batch|Y
01|153400|2|1|1st Batch|Y
01|153404|3|1|*** Motor swap on NST250 (to alpha 4) drive unit swap|Y
01|153404|3|2|on machine parameter changes labor time/travel.|Y
01|153407|1|1|Please Note: C5011-1500-4.00 New PT#C5001-1500-4.00CP|Y
01|153407|3|1|Winter Promo 5% added to discount.|Y
01|153415|1|1|Please Note: C5011-1500-4.00 New PT#C5001-1500-4.00CP|Y
01|153415|3|1|Winter Promo 5% added to discount.|Y
01|153438|5|1|PRE-SPDL-HSK63R|Y
01|153438|7|1|INSTALLATION AND TRAINING FOR A TOTAL OF 8 HOURS|Y
01|153438|15|1|INSTALLATION AND TRAINING FOR A TOTAL OF 8 HOURS|Y
01|153442|3|1|BMT55 SPINDLE FOR E68LA|Y
01|153442|4|1|NAKAMURA 44MM SPINDLE FOR E68LA|Y
01|153442|6|1|INSTALLATION AND TRAINING OF 16 HOURS TOTAL|Y
01|153449|5|1|Min Order Qty: 1-4|Y
01|153449|6|1|Min Order Qty: 5-9|Y
01|153449|7|1|Min Order Qty: 10-50|Y
01|153449|8|1|Min Order Qty: 51-100|Y
01|153449|9|1|Min Order Qty: 101+|Y
01|153449|13|1|Min. Order Qty: 1-20|Y
01|153449|14|1|Min. Order Qty: 21-50|Y
01|153449|15|1|Min. Order Qty: 51+|Y
01|153490|1|1|BT40-FMB40-60|Y
01|153490|1|2|BT40 40mm Face Mill holder (4-bolt) w/ 60mm projection|Y
01|153490|1|3|NET PRICE|Y
01|153491|1|1|1:1 Gear   Max 4000RPM|Y
01|153491|3|1|Mori Live Z-Axis ER20 Sub-Off <AXIAL>|Y
01|153491|3|2|1:4 Gear Speeder|Y
01|153494|1|1|Tool Certificate #10220-2847-011921|Y
01|153498|3|1|RCN8390F with 100mm bore Heidenhain scale|Y
01|153498|4|1|Includes custom sheet metal for cable management|Y
01|153499|1|1|5AX-201 SN: 5137|Y
01|153499|1|2|TAR-56608|Y
01|153513|1|1|P/N: CHS-3.0|Y
01|153513|2|1|P/N: CHS-3.175|Y
01|153528|1|1|ZKG12-10-100L - #1 TorqCon Tap Collet .394x.315|Y
01|153528|1|2|10.0X8.0 M103/8 - LONG SIZE (100L)|Y
01|153530|2|1|Comes with START2-UNIT-200|Y
01|153530|3|1|Comes with START2-UNIT-200|Y
01|153530|4|1|Comes with START2-UNIT-200|Y
01|153532|1|1|Reference RGA# LVR-56724|Y
01|153532|1|2|Repair of MRAM-EXT-100 s/n: 46887 02 (Mimatic# 162758)|Y
01|153532|2|1|Bearings seals and o-rings to be replaced|Y
01|153532|4|1|Repair of MRAM-ER25-IC s/n: 93948 02 (Mimatic# 162765)|Y
01|153532|5|1|Bearings seals o-rings and 1 output spindle to be|Y
01|153532|5|2|replaced. There was no collet nut.|Y
01|153533|1|1|Item is a non standard stock itemnon returnable|Y
01|153534|3|1|1PC PRICING|Y
01|153534|4|1|2PC PRICING|Y
01|153540|9|1|TOOLING CERTIFICATE CAN BE REDEEMED FOR ANY L-N|Y
01|153540|9|2|STANDARD OR ADVANCED TOOL HOLDER PRODUCTS.|Y
01|153540|9|3|THIS IS INCLUDED AN NO ADDITIONAL COST TO MORRIS SOUTH|Y
01|153540|9|4|OR TROPIC MOLD (KENNY CLEVELAND).|Y
01|153541|2|1|This item is discontinued once ordered it cannot be|Y
01|153541|2|2|returned|Y
01|153543|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153543|1|2|**HOT DEALS** DIST Net $111 EU Net $139 While Qtys Last|Y
01|153543|1|3|***G.L. 3.15***|Y
01|153543|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153543|2|2|**HOT DEALS** DIST Net $111 EU Net $138 While Qtys Last|Y
01|153543|2|3|***G.L. 3.15***|Y
01|153543|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153543|3|2|**HOT DEALS** DIST Net $149 EU Net $187 While Qtys Last|Y
01|153543|3|3|***G.L. 2.36***|Y
01|153543|4|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153543|4|2|**HOT DEALS** DIST Net $134 EU Net $168 While Qtys Last|Y
01|153543|4|3|***G.L. 5.12***|Y
01|153543|5|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153543|5|2|**HOT DEALS** DIST Net $111 EU Net $139 While Qtys Last|Y
01|153543|5|3|G.L. 3.15|Y
01|153543|6|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153543|6|2|**HOT DEALS** DIST Net $136 EU Net $170 While Qtys Last|Y
01|153543|6|3|***G.L. 5.12***|Y
01|153543|7|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153543|7|2|**HOT DEALS** DIST Net $111 EU Net $138 While Qtys Last|Y
01|153543|7|3|G.L. 3.15|Y
01|153545|9|1|TOOLING CERTIFICATE CAN BE REDEEMED FOR ANY L-N|Y
01|153545|9|2|STANDARD OR ADVANCED TOOL HOLDER PRODUCTS.|Y
01|153545|9|3|THIS IS INCLUDED AN NO ADDITIONAL COST TO MORRIS SOUTH|Y
01|153545|9|4|OR TROPIC MOLD (KENNY CLEVELAND).|Y
01|153554|23|1|PRICE ONLY AVAILBLE WITH PACKAGE PURCHASE|Y
01|153600|1|1|HSK63A-SCA25-139|Y
01|153600|1|2|HSK63A Stub mill holder spacers are included|Y
01|153600|1|3|Not cancellable and not returnable|Y
01|153604|1|1|We do not have 3 ER 32 chucks I've added the 6 pcs|Y
01|153604|1|2|of 3 to this line for 4|Y
01|153604|4|1|Requested 3 ours is 4|Y
01|153604|5|1|requested 5 ours is 6|Y
01|153604|7|1|Requested 3 ours is 4|Y
01|153604|9|1|Requested 2.5 GL ours is 3|Y
01|153604|15|1|Requested 2.5 GL ours is 2|Y
01|153604|17|1|Requested 2.5 GL ours is 2|Y
01|153604|18|1|Requested 3 GL ours is 4|Y
01|153604|19|1|Requested 4.5 GL ours is 4|Y
01|153604|21|1|Requested 2.5 GL ours is 1.75|Y
01|153604|22|1|Requested 1 GL ours is 2|Y
01|153604|26|1|Closest to 6mm we can get in a sealed collet|Y
01|153604|42|1|We do not have a 1 ER40 Collet but this metric will|Y
01|153604|42|2|work. It will hold 25mm -25.4 mm|Y
01|153604|43|1|We don't have a 3/4 ER40 Collet but this one will|Y
01|153604|43|2|work|Y
01|153611|1|1|Per our conversation - this price is to convert|Y
01|153611|1|2|the 5 axis table from GA Tech to Okuma Mill all items|Y
01|153611|1|3|Including Labor- this does not include freight. Morris|Y
01|153611|1|4|to install.|Y
01|153612|2|1|OKEX-ER32X-OFF-ICE|Y
01|153612|2|2|Okuma Live Tool X-Axis Offset IntCoolant|Y
01|153612|2|3|Mim# 192665|Y
01|153633|4|1|Roller Bearing Type ER16 for Pricing|Y
01|153633|5|1|Roller Bearing Type ER16 for Pricing|Y
01|153633|6|1|Roller Bearing Type ER16 for Pricing|Y
01|153638|4|1|Winter Promo 5% extra added to discount on this quote.|Y
01|153639|1|1|Capable of internal or external coolant or can be run|Y
01|153639|1|2|dry 24/7.|Y
01|153641|4|1|Winter Promo 5% extra added to discount on this quote.|Y
01|153647|4|1|Winter Promo 5% extra added to discount on this quote.|Y
01|153651|1|1|*customer must machine to 1mm|Y
01|153661|5|1|Winter Promo 5% extra added to discount on this quote.|Y
01|153662|8|1|Requested 3 ours is 4|Y
01|153662|10|1|Requested 2.5 GL ours is 3|Y
01|153662|16|1|Requested 2.5 GL ours is 2|Y
01|153662|18|1|Requested 2.5 GL ours is 2|Y
01|153662|19|1|Requested 3 GL ours is 4|Y
01|153662|20|1|Requested 4.5 GL ours is 4|Y
01|153662|22|1|Requested 2.5 GL ours is 1.75|Y
01|153662|23|1|Requested 1 GL ours is 2|Y
01|153662|27|1|Closest to 6mm we can get in a sealed collet|Y
01|153662|43|1|We do not have a 1 ER40 Collet but this metric will|Y
01|153662|43|2|work. It will hold 25mm -25.4 mm|Y
01|153662|44|1|We don't have a 3/4 ER40 Collet but this one will|Y
01|153662|44|2|work|Y
01|153664|2|1|Extra 5% promo discount applied|Y
01|153666|1|1|AC4-SLA25-75|Y
01|153677|4|1|Same as the FK-8 wrench.|Y
01|153725|1|1|CNC250FA SN: 4116|Y
01|153725|1|2|TAR-56691|Y
01|153725|25|1|New Direct Mount Cable Set|Y
01|153725|26|1|Motor Evaluation/Inspection|Y
01|153726|5|1|An additional 5% discount has been applied per our|Y
01|153726|5|2|Winter Hardwork Promotion.|Y
01|153727|3|1|Extra 5% promo discount applied|Y
01|153732|3|1|Installation includes: Drive unit short bar fiber|Y
01|153732|3|2|optic cable communications cable bulkhead cables|Y
01|153732|3|3|external cables parameter changes service time and|Y
01|153732|3|4|travel.|Y
01|153739|3|1|Includes: Bulkhed cables external cables parameter|Y
01|153739|3|2|changes service time and travel.|Y
01|153739|4|1|$1000.00 Free List price Tooling.|Y
01|153745|5|1|If PO is over $500 list price you may add 5% to each|Y
01|153745|5|2|line item for a total discount of 33% per line item|Y
01|153750|1|1|Mazak H-Type for MPX6300|Y
01|153750|1|2|Capto C5 1:1 Gear Ratio|Y
01|153750|1|3|ICE Version|Y
01|153750|1|4|Mim# 197612|Y
01|153750|1|5|LYN part#MZMP5-CAPTO5Z-ICE|Y
01|153751|4|1|Part # NC5006-0625-4.00CP|Y
01|153754|1|1|5AX-2MT-225-304.8 SN: 2183|Y
01|153754|1|2|Sent in for repair TAR-56666|Y
01|153758|1|1|Tooling Certificate Number: E1094-2754-092520|Y
01|153761|1|1|NCAT50-NPU13-90U-IDU|Y
01|153761|1|2|Taper Plus CAT50 Keyless Chuck  With Chip Hole|Y
01|153761|1|3|3/32-1/2in (1mm - 13mm)|Y
01|153761|1|4|Quoted at NET price.|Y
01|153769|1|1|NC4006-1000-3.00 2Lock TaperPlus NCAT40 1in End Mill|Y
01|153769|1|2|Holder : OD 1.90 OD >> With 2 Set Screws|Y
01|153769|1|3|Net Price quoted minimum order 5 holders.|Y
01|153769|2|1|NC4006-1000-3.00 2Lock TaperPlus NCAT40 1in End Mill|Y
01|153769|2|2|Holder : OD 1.90 OD >> With 2 Set Screws|Y
01|153769|2|3|Net Price quoted minimum order 10 holders.|Y
01|153769|3|1|NC4006-1000-3.00 2Lock TaperPlus NCAT40 1in End Mill|Y
01|153769|3|2|Holder : OD 1.90 OD >> With 2 Set Screws|Y
01|153769|3|3|Net Price quoted minimum order 15 holders.|Y
01|153769|4|1|NC4006-1000-3.00 2Lock TaperPlus NCAT40 1in End Mill|Y
01|153769|4|2|Holder : OD 1.90 OD >> With 2 Set Screws|Y
01|153769|4|3|Net Price quoted minimum order 20 holders.|Y
01|153779|14|1|ADDITIONAL INSTALLATION & TRAINING FOR TID SYSTEM|Y
01|153781|1|1|Quoted as NET pricing non-returnable non-cancellable|Y
01|153781|3|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|153781|4|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|153781|7|1|Quoted as NET pricingnon-returnablenon=cancelable|Y
01|153781|10|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|153781|11|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|153784|5|1|Winter Promo 5% extra applied to the discount on this|Y
01|153784|5|2|quote.|Y
01|153788|3|1|***ETA 4/22 If ordered by ***4/2***|Y
01|153788|6|1|***ETA 4/22 If ordered by ***4/2***|Y
01|153788|8|1|***ETA 4/22 If ordered by ***4/2***|Y
01|153791|3|1|An additional 5% discount has been applied per our|Y
01|153791|3|2|Winter Hardwork Promo.|Y
01|153803|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153803|1|2|**HOT DEALS** DIST Net $111 EU Net $139 While Qtys Last|Y
01|153803|1|3|***G.L. 3.15***|Y
01|153803|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153803|2|2|**HOT DEALS** DIST Net $111 EU Net $138 While Qtys Last|Y
01|153803|2|3|***G.L. 3.15***|Y
01|153803|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153803|3|2|**HOT DEALS** DIST Net $149 EU Net $187 While Qtys Last|Y
01|153803|3|3|***G.L. 2.36***|Y
01|153803|4|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153803|4|2|**HOT DEALS** DIST Net $134 EU Net $168 While Qtys Last|Y
01|153803|4|3|***G.L. 5.12***|Y
01|153803|5|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153803|5|2|**HOT DEALS** DIST Net $111 EU Net $139 While Qtys Last|Y
01|153803|5|3|G.L. 3.15|Y
01|153803|6|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153803|6|2|**HOT DEALS** DIST Net $136 EU Net $170 While Qtys Last|Y
01|153803|6|3|***G.L. 5.12***|Y
01|153803|7|1|** Closeout Promotion! All sales are FINAL!**|Y
01|153803|7|2|**HOT DEALS** DIST Net $111 EU Net $138 While Qtys Last|Y
01|153803|7|3|G.L. 3.15|Y
01|153817|2|1|POSITIONING BLOCK FOR HAAS VF11/50|Y
01|153826|1|1|ref.Okuma Part# T129-530-003-08-1|Y
01|153830|4|1|Extra 5% promo discount applied|Y
01|153835|3|1|4-7 piece price.|Y
01|153835|4|1|8 piece price.|Y
01|153859|1|1|P/N: MNZ20-SK16-AD-ICE|Y
01|153859|1|2|Ref: 195858 but SK16 output|Y
01|153859|2|1|P/N: MNZ20-SK16-FA45-ICE|Y
01|153859|2|2|Ref: 195858 BUT FIXED ANGLE AT 45DEG - SK16 OUTPUT|Y
01|153859|3|1|P/N: MNZ20-ER25-AD-ICE|Y
01|153859|3|2|Ref: 195858|Y
01|153861|6|1|An additional 5% discount has been applied per our|Y
01|153861|6|2|Winter Hardwork Promotion.|Y
01|153866|1|1|Reference RGA# LVR-56699|Y
01|153866|1|2|Repair of C40-MRAM s/n: 88145 01 (Mimatic# 162731)|Y
01|153866|2|1|Bearings seals o-ring and input spindle to be|Y
01|153866|2|2|replaced.|Y
01|153869|1|1|Custom HMI work to include:|Y
01|153869|1|2|1.Password protect the part list screen|Y
01|153869|1|3|2.Shelf data screen load part button operation|Y
01|153869|1|4|3.Shelf data screen scan operation button|Y
01|153869|1|5|4.Part list screen operation|Y
01|153882|3|1|ID chip hole installation & rebalance|Y
01|153882|3|2|Final part number will be C5001-1000-1.75-IDI|Y
01|153905|1|1|Thread: M18x1 O-ring: 10x2.5mm (outer) 10x2mm (inner)|Y
01|153915|3|1|INSTALLATION INCLUDES: DRIVE UNIT SHORT BAR FIBER|Y
01|153915|3|2|OPTIC CABLE COMMUNICATIONS CABLE BULKHEAD CABLES|Y
01|153915|3|3|EXTERNAL CABLES PARAMETER CHANGES SERVICES TIME AND|Y
01|153915|3|4|LABOR|Y
01|153917|12|1|INSTALLATION & TRAINING FOR TID SYSTEM|Y
01|153920|2|1|Same as NKA01-13000 but has a Hex Nut instead of Round|Y
01|153920|2|2|Nut with Spanner Slots. Same as last purchase.|Y
01|153920|5|1|An additional 10% discount has been applied per our|Y
01|153920|5|2|Winter Hardwork Promotion.|Y
01|153922|22|1|MONOBLOCK/SINGLE PIECE POSITIONING BLOCK FOR 110MM|Y
01|153922|22|2|TAPERED POSITIONING PIN.|Y
01|153922|23|1|TWO PIECE POSITIONING BLOCK DESIGN FOR 110MM TAPERED|Y
01|153922|23|2|POSITIONING PIN.|Y
01|153923|1|1|** Draw nut supplied w/out thread|Y
01|153923|2|1|#4 Draw Screw for HW-08-HS/H037M8|Y
01|153923|3|1|#5 Retainer for HW-08-HS/H037M8|Y
01|153926|1|1|ETA 2-8 Weeks|Y
01|153927|1|1|ETA 2-8 WEEKS|Y
01|153927|2|1|ETA 2-8 WEEKS|Y
01|153939|3|1|Cable Set|Y
01|153949|1|1|SEE CATALOG PAGE 5 FOR COOLANT OPTIONS...|Y
01|153949|5|1|REFER TO CATALOG PAGE 3 FOR INDEX OF ATTACHMENTS:|Y
01|153949|17|1|THEY ARE PRETTY EASY TO MAKE IF CUSTOMER WOULD LIKE|Y
01|153949|17|2|TO MAKE HIS OWN BLOCKS. OR WE CAN MAKE THE FIRST ONE|Y
01|153949|17|3|AND INCLUDE A DRAWING WITH IT SO HE CAN MAKE MORE.|Y
01|153949|18|1|POSITION|Y
01|153952|3|1|An additional 5% discount has been applied per our|Y
01|153952|3|2|Winter Hardwork Promo.|Y
01|153953|2|1|This item is USED and sold AS IS|Y
01|153953|2|2|non-returnable|Y
01|153958|9|1|closest match to 3/64 size|Y
01|153958|11|1|closest match to 5/64 size|Y
01|153959|1|1|Reference RGA# LVR-56723|Y
01|153959|1|2|Repair of C40RAM-ER20-225ST s/n: 716102|Y
01|153959|1|3|(Mimatic# 135614)|Y
01|153959|2|1|Bearings seals o-rings and 1 input spindle to be|Y
01|153959|2|2|replaced. Recondition 1 output spindle.|Y
01|153968|5|1|Winter Promo 5% extra added to discount. Order must be|Y
01|153968|5|2|$500.00 list and above. Thank you!!|Y
01|153972|1|1|S/N 17221 - Used Rotary Table some small surface rust|Y
01|153972|1|2|and light scratched on the faceplate. Includes a 1 year|Y
01|153972|1|3|warranty.|Y
01|153978|1|1|Uses sames wrench and setting fixture as the|Y
01|153978|1|2|MZQT47-ER32Z-HS2|Y
01|153978|2|1|Extra 5% promo discount applied|Y
01|153987|1|1|Reference RGA# LVR-56744|Y
01|153987|1|2|Repair of BMT45-ER25Z-ICE s/n: 19904341 05|Y
01|153987|1|3|(Mimatic# 192509)|Y
01|153987|2|1|Bearings seals o-rings to be replaced. Recondition 1|Y
01|153987|2|2|input spindle and 1 output spindle.|Y
01|153989|1|1|Replacement Table for CNC250FA SN: 4116|Y
01|153989|1|2|See RGA TAR-56691|Y
01|153989|1|3|** Price is with Core Trade in / Discount **|Y
01|154016|2|1|***PRICE MUST BE ESTIMATED DUE TO I/F BEING LOCATED|Y
01|154016|2|2|OPPOSITE THE LEFT SIDE. INSTALL COST AND MATERIALS|Y
01|154016|2|3|ARE TO BE DETERMINED***|Y
01|154016|6|1|Installation includes: drive unit short bar fiber|Y
01|154016|6|2|optic cables communication cables bulk head cable|Y
01|154016|6|3|set external cable set parameter changes service|Y
01|154016|6|4|time and travel.|Y
01|154024|1|1|for 11-NANUT nut|Y
01|154033|8|1|Extra 5% Promo discount applied|Y
01|154039|3|1|D1-8 Adapter and modification|Y
01|154042|2|1|Heidenhain scale with mounting kit|Y
01|154042|4|1|Cable set for installation.|Y
01|154048|21|1|An additional 10% discount has been applied per our|Y
01|154048|21|2|Winter Hardwork Promo.|Y
01|154056|1|1|TAR-56704|Y
01|154056|1|2|5AX-2002DA21FA-M SN: 2069|Y
01|154060|2|1|For Materials: Cast Iron Aluminum|Y
01|154060|3|1|For Materials: Mild Steel Stainless Steel Die Steel.|Y
01|154065|1|1|P/N: MNZ20-ER32Z-ICE-12K|Y
01|154065|2|1|P/N: MNZ20-ER32Z-ICE|Y
01|154073|4|1|Stallion Trunnion with 12 x 48 working surface|Y
01|154073|4|2|guaranteed flat within .001 per 24. Class 35 Heavy|Y
01|154073|4|3|Duty casting. Includes a 50mm riser for the TAT-401.|Y
01|154073|5|1|1.50 Thick Base Plate for assembly. Mounting holes and|Y
01|154073|5|2|keyways for Nikken CNCB450 and TAT-401. Will be made to|Y
01|154073|5|3|fit onto to customer specified machine tool. Sine keys|Y
01|154073|5|4|will be provided to locate plate into T-slots of table.|Y
01|154073|5|5|Plate will mount T-slot table with provided hardware.|Y
01|154073|6|1|1/2-13 Tapped and .501 Hardened Bushing every other|Y
01|154073|6|2|hole on a 2 Grid Pattern on the 12 x 48 Trunnion.|Y
01|154076|1|1|**Special|Y
01|154076|1|2|**Net price|Y
01|154088|1|1|***Miyano Live;Straight; ER25|Y
01|154088|1|2|Machine:MIYANO ABX BND BNE BNJ|Y
01|154093|2|1|3Lock MBT50 32mm Milling Chuck High Speed|Y
01|154093|2|2|ETA 4-5 Weeks ARO|Y
01|154098|1|1|1st Batch|Y
01|154120|4|1|1-stock Balance as follows:(12) ETA 5/4 (9) ETA|Y
01|154120|4|2|Mid June / Balance 11-12 Weeks (ARO)|Y
01|154120|5|1|(20) ETA End May (4) ETA 11-12 Weeks (ARO)|Y
01|154120|6|1|(1) ETA 5/4 (ARO)|Y
01|154120|8|1|(6) ETA 11-12 Weeks (ARO)|Y
01|154120|9|1|111 ETA Mid-End June|Y
01|154126|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|154126|1|2|**HOT DEALS** DIST Net $266 EU Net $333 While Qtys Last|Y
01|154126|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|154126|2|2|**HOT DEALS** DIST Net $316 EU Net $395 While Qtys Last|Y
01|154132|2|1|CAT50 AGH with 3 support pins;Ref Drawing #00037955|Y
01|154132|2|2|29.9mm Arbor;external coolant.L=246mm;|Y
01|154132|2|3|1.5/1 gear max 280Nm input 2250RPM/output 1500RPM Max|Y
01|154132|2|4|NET priceno additional disount|Y
01|154132|6|1|CAT50 Flexible 0-98deg AGH; Ref Drawing #00030310|Y
01|154132|6|2|MI50 with STANDARD support pins;with stop block #171426|Y
01|154132|6|3|A-80mm;d=20mm;L=225mm;L1=109mm;1/1 gear max 70Nm|Y
01|154132|6|4|6000 RPM|Y
01|154132|6|5|NET priceno additional discount|Y
01|154132|6|6|Drawing must be approved prior to the start of mfg|Y
01|154132|7|1|Item #171426; support pin. Included in price above|Y
01|154132|8|1|NET priceno additional discount applied|Y
01|154132|8|2|Dimensions to be determined|Y
01|154133|1|1|H63A(80)-SF32-100|Y
01|154133|1|2|*Orizon Spec|Y
01|154133|1|3|Pan Head Screws Chip Installed (BIS-C-122-04/L)|Y
01|154133|1|4|and coolant tube installed.   *Cavity depth TBD|Y
01|154133|5|1|H63A(80)-C32-105|Y
01|154133|9|1|H63A(80)-C42-115|Y
01|154133|9|2|*Orizon Spec|Y
01|154133|9|3|Pan Head Screws Chip Installed (BIS-C-122-04/L)|Y
01|154133|9|4|and coolant tube installed.|Y
01|154133|16|1|H63A(80)-C40|Y
01|154141|4|1|Install on DNM5700.|Y
01|154141|5|1|Price is for Installation on (3) DMP500/2SP. Use the|Y
01|154141|5|2|AMP and Cable Set from previous install on DNM5700.|Y
01|154156|1|1|If ordered by 3/31lead is 1 week|Y
01|154159|5|1|LYN to make position block upon receipt of customer's|Y
01|154159|5|2|spindle drawing specs confirmed|Y
01|154159|5|3|***NET PRICE***|Y
01|154177|3|1|Installation includes: drive unit short bar fiber|Y
01|154177|3|2|optic cables communication cables bulk head cable|Y
01|154177|3|3|set external cable set parameter changes service|Y
01|154177|3|4|time and travel.|Y
01|154190|2|1|***D35 L19 M25x1.5***|Y
01|154199|1|1|Tooling Certificate Number:|Y
01|154225|3|1|EXPIRES TODAY !! 3/31/21|Y
01|154240|1|1|NC5-63-FMH16-37-45S|Y
01|154240|1|2|NC5 Face Mill Arbor- 16mm Pilot  w/ 45mm L|Y
01|154240|1|3|installed with PS-N63AE pull stud|Y
01|154240|1|4|*based on Sandvik cutter info provided|Y
01|154240|2|1|Installed on NC5-63-FMH16-37-45S at factory|Y
01|154240|5|1|NC5-63-FMH22-47-45|Y
01|154240|5|2|NC5 Face Mill Arbor 22mm Pilot  w/ 45mm L|Y
01|154240|5|3|installed with PS-N63AE pull stud|Y
01|154240|5|4|*based on Sandvik cutter info provided|Y
01|154240|6|1|Installed on NC5-63-FMH22-47-45 at factory|Y
01|154240|12|1|NC5-63-FMH27-60-45|Y
01|154240|12|2|NC5 Face Mill Arbor Type 27mm Pilot  w/ 45mm L|Y
01|154240|12|3|installed with PS-N63AE pull stud|Y
01|154240|12|4|*based on Sandvik cutter info provided|Y
01|154240|13|1|Installed on NC5-63-FMH27-60-45 at factory|Y
01|154249|6|1|Alternate for NCAT40-SK10C-150U-IDU|Y
01|154265|1|1|Reference RGA# CUR-56783|Y
01|154265|1|2|Repair of CAT40U-NX5-153 s/n: NDAF-023|Y
01|154269|1|1|10220-2847-011921|Y
01|154270|10|1|An additional 10% discount has been applied per our|Y
01|154270|10|2|Winter Hardwork Promo. List Price order must be over|Y
01|154270|10|3|$5000 to qualify. A 5% discount would apply between|Y
01|154270|10|4|$500 and $5000 list price order.|Y
01|154274|2|1|This item is not returnable..|Y
01|154277|1|1|1st Batch|Y
01|154282|1|1|Please Note: These are Nikken's 3-lock taper. They|Y
01|154282|1|2|can only be used in a Big spindle. These are not|Y
01|154282|1|3|coolant capable. We have 11 pcs remaining at Lyndex-|Y
01|154282|1|4|Nikken and cannot get anymore.|Y
01|154282|2|1|NCAT50-MMC8C-105U-IDU|Y
01|154282|2|2|Taper Plus (Dual Contact)CAT50 10mm Mini-Mini Chuck|Y
01|154282|2|3|Coolant Capable W/ ID Chip Hole|Y
01|154282|4|1|This is another option if they need all 12 holders.|Y
01|154282|4|2|Holders are standard CAT50.|Y
01|154290|22|1|MONOBLOCK/SINGLE PIECE POSITIONING BLOCK FOR 110MM|Y
01|154290|22|2|TAPERED POSITIONING PIN.|Y
01|154290|23|1|TWO PIECE POSITIONING BLOCK DESIGN FOR 110MM TAPERED|Y
01|154290|23|2|POSITIONING PIN.|Y
01|154291|2|1|2EA EXTERNAL POWER CABLESET|Y
01|154291|2|2|2EA EXTERNAL FEEDBACK CABLESET|Y
01|154295|2|1|2ea EXTERNAL POWER CABLE SET|Y
01|154295|2|2|2ea EXTERNAL FEEDBACK CABLE SET|Y
01|154305|1|1|e346N P&M and Calibration. Includes all fees|Y
01|154305|1|2|TravelLabor. Any part replacements necessary will be|Y
01|154305|1|3|discussed and aproved by T&S before proceeding|Y
01|154314|1|1|***Miyano Live;Straight; ER25|Y
01|154314|1|2|Machine:MIYANO ABX BND BNE BNJ|Y
01|154319|1|1|Tooling Certificate Number: 13687-2448-100719|Y
01|154323|3|1|Please Note: Part number will be CAT50-ER40-8.00BN|Y
01|154323|3|2|for this item. We have not entered this part number|Y
01|154323|3|3|into our computer yet.|Y
01|154327|2|1|Installation includes: Dual axis drive unit short bar|Y
01|154327|2|2|fiber optic cables communications cables bulkhead|Y
01|154327|2|3|cables external cables parameter changes service|Y
01|154327|2|4|time and travel.|Y
01|154330|5|1|EXTERNAL POWER CABLE SET|Y
01|154330|5|2|EXTERNAL FEEDBACK CABLE SET|Y
01|154347|1|1|TAR-56697|Y
01|154347|1|2|5AX-120BMA SN: LN-001|Y
01|154347|19|1|Replaces WP-13|Y
01|154347|20|1|Replaces JIS-W1517-AN6230-#4|Y
01|154347|39|1|AX121R039|Y
01|154365|2|1|Reconfirm Center Height|Y
01|154377|1|1|TABLE IS IN STOCK DELIVERY IS FOR INSPECTION AND|Y
01|154377|1|2|TO PREPARE FOR SHIPPING.|Y
01|154377|2|1|2EA EXTERNAL POWER CABLE SET|Y
01|154377|2|2|2EA EXTERNAL FEEDBACK CABLE SET|Y
01|154382|1|1|Includes table drive unit external + interface cables|Y
01|154382|1|2|t-slotted face plate|Y
01|154382|2|1|Travel + labor on-site technician|Y
01|154396|1|1|Tool #1|Y
01|154396|2|1|Tool #2|Y
01|154396|4|1|Tool #3|Y
01|154396|5|1|Tool #4|Y
01|154396|6|1|Tool #5|Y
01|154396|8|1|Tool #6|Y
01|154396|10|1|Tool# 7|Y
01|154396|12|1|Tool# 8|Y
01|154396|14|1|Tool# 9|Y
01|154396|16|1|Tool# 10|Y
01|154396|18|1|Tool# 11|Y
01|154396|20|1|Tool# 12|Y
01|154396|22|1|Tool# 13|Y
01|154396|24|1|Tool# 14|Y
01|154396|26|1|Tool# 15|Y
01|154396|28|1|Tool# 16|Y
01|154396|30|1|Tool# 17|Y
01|154396|32|1|Tool# 18|Y
01|154396|34|1|Tool# 19|Y
01|154396|38|1|An additional 10% has been applied per our Spring|Y
01|154396|38|2|Hardwork Promo.|Y
01|154397|1|1|Desc:Large Chamfered Edge|Y
01|154397|1|2|Mach: Good for Grinding MC|Y
01|154397|2|1|Desc: KM20 Straight Collet/Sleeve 1/2In Anniversary|Y
01|154397|2|2|Spec: Anniversary: Back-Slots & Small Chamfered Edge|Y
01|154404|8|1|Extra 10% promo discount applied|Y
01|154410|11|1|An additional 10% discount has been applied to this|Y
01|154410|11|2|quotation per our Winter Promo. Thank you!|Y
01|154413|2|1|Reconfirm Center Height|Y
01|154413|6|1|Promo discount based on quantities quoted.|Y
01|154416|1|1|This unit has Air over Hyd Booster for Break|Y
01|154416|1|2|Unit without the - AHB is $3000.00 Less on list price|Y
01|154416|3|1|Power and Feed Back Cables from 4th axis to bulkhead|Y
01|154416|3|2|Machine Tool Dealer to provide 4th axis interface|Y
01|154416|3|3|Machine Tool Dealer to install|Y
01|154429|1|1|TAR-56751|Y
01|154429|1|2|CNCZ180L SN: 10045|Y
01|154429|31|1|CN103R007|Y
01|154433|1|1|TAR-56751|Y
01|154433|1|2|CNCZ180L SN: 10044|Y
01|154435|1|1|Modification to convert table to Fanuc Specification|Y
01|154435|2|1|TAR-56760|Y
01|154435|2|2|CNCZ100-4W-120 SN: 1063|Y
01|154435|2|3|** BELOW ARE ITEMS NECESSARY TO REPAIR/REBUILD **|Y
01|154445|3|1|Special extra long cabling from controller to cabinet|Y
01|154445|7|1|Special extra long cabling from controller to cabinet|Y
01|154449|1|1|Item is a non standard special and is not cancelable|Y
01|154449|1|2|nor returnable once ordered|Y
01|154468|3|1|NC4007-0032-3.13BN 2Lock Taper+ NCAT40 ER32 Collet|Y
01|154468|3|2|Chuck w/ID ChipHole and E32-NUT installed.|Y
01|154488|4|1|An additional 10% discount has been applied per our|Y
01|154488|4|2|Spring Hardwork Promo.|Y
01|154499|1|1|TAR-56721|Y
01|154499|1|2|5AX-201FA SN: 1189|Y
01|154499|3|1|Replaces BE3908E01X2|Y
01|154499|32|1|Replaces NIK-1555-300|Y
01|154500|1|1|Special High Column table with 50MM riser.|Y
01|154500|3|1|Adapter plate for closer.|Y
01|154500|4|1|Includes: Parameter changes.|Y
01|154500|5|1|B60 collet|Y
01|154500|6|1|B60 collet price|Y
01|154500|7|1|Part # P-245S Tailstock - Center Height Matched per|Y
01|154500|7|2|above Table|Y
01|154501|2|1|Customer will choose between either version|Y
01|154508|1|1|Cable Set - 5AX-2002FA-M SN: 2276|Y
01|154508|1|2|Rotary Axis Cable Set - ** Length TBD **|Y
01|154508|1|3|Power and Feedback external cables|Y
01|154509|3|1|The collapsible range is .137-.157 which may cover the|Y
01|154509|3|2|#4 drill and the 5/32 size. Check with customer|Y
01|154509|4|1|Range 0.196-0.216|Y
01|154518|1|1|Ref. S#30345TC|Y
01|154528|16|1|ALT for NC5001-0750-4.00CP|Y
01|154528|16|2|(105mm/4.13 projection)|Y
01|154529|1|1|Reference RGA# LVR-56792|Y
01|154529|1|2|Repair of MNL12-ER32Z-MS-10K s/n: A0017|Y
01|154529|1|3|(Alps# MSA01-3E000)|Y
01|154529|2|1|Bearings o-rings collet nuts & spindle to be replaced|Y
01|154529|4|1|Repair of MNL12-ER32Z-MS-10K s/n: A0019|Y
01|154529|4|2|(Alps# MSA01-3E000)|Y
01|154529|5|1|Bearings o-rings collet nuts & spindle to be replaced|Y
01|154529|7|1|Repair of MNL12-ER32Z-10K s/n: A0015|Y
01|154529|7|2|(Alps# MSA01-4R000)|Y
01|154529|8|1|Bearings o-rings collet nuts & spindle to be replaced|Y
01|154532|1|1|Riser for CNCZ105|Y
01|154532|2|1|Riser for PBA-105|Y
01|154536|3|1|HSK63A-0312-6.00-IDU|Y
01|154536|3|2|HSK63A 5/16 End Mill Holder w/ID Chip Hole|Y
01|154559|11|1|Please Note: Sprin promo 5% extra added to discount|Y
01|154559|11|2|on this quote.|Y
01|154583|43|1|Tilt side casting|Y
01|154583|43|2|M2105R002|Y
01|154583|43|3|Pricing on this component is an estimate.|Y
01|154583|43|4|Actual pricing to be determined at a later date.|Y
01|154612|1|1|WRENCHES INCLUDED|Y
01|154619|1|1|*In stock alternative to NC4007-0032-3.13|Y
01|154619|1|2|*This is a bearing smooth nut holder|Y
01|154644|5|1|Optional|Y
01|154644|6|1|optional|Y
01|154646|2|1|Extra 5% promo discount applied|Y
01|154648|1|1|Ladder software option to be provided by DMG Mori|Y
01|154648|3|1|3J pneumatic collet closer with cylinder and draw tube|Y
01|154648|4|1|Subplate per customer drawing on last order|Y
01|154654|14|1|Please Note: Spring promo 10% extra discount added to|Y
01|154654|14|2|quote.|Y
01|154675|6|1|DualContact NCAT50 ER32 Right Angle Head IntC 110mm|Y
01|154675|6|2|Pitch Taper|Y
01|154675|6|3|NC50RAM-ER32-180IC-110TP|Y
01|154688|1|1|TCE-56058|Y
01|154688|2|1|TCE-56057|Y
01|154688|4|1|TCE-22340|Y
01|154697|2|1|Power Cable 10m(32ft)|Y
01|154697|3|1|Feedback Cable 10m(32ft)|Y
01|154697|5|1|Scale Mount Kit|Y
01|154698|1|1|Angle Plate for CNC1600FA-M|Y
01|154712|3|1|CAT50; AGH; 3/4 PILOT ARBOR|Y
01|154712|3|2|3-Pin Support|Y
01|154712|3|3|L=280mm/ L1=170mm|Y
01|154712|3|4|MAX 150Nm|Y
01|154712|3|5|1/1 Gear; Max 5000RPM|Y
01|154712|3|6|Ref. Drwg# 00040535 (concept only)|Y
01|154722|1|1|***Live Tool Core Buyback***|Y
01|154722|1|2|L-N recommends distributor sell to end user list price|Y
01|154722|1|3|less 25% discount. Total discount presented to DCT will|Y
01|154722|1|4|be 45% from standard 28% discount following list price.|Y
01|154722|1|5|Once PO is received:RGA will be issued to DCT to have|Y
01|154722|1|6|the old unit they have returned.|Y
01|154724|1|1|Repair RGA#TOR-56823|Y
01|154724|1|2|Repair of PF-2|Y
01|154724|4|1|Calibration service included|Y
01|154726|36|1|Spring Promo pricing has been applied with the|Y
01|154726|36|2|additional 10%|Y
01|154734|3|1|Please note: Spring promo 5% extra added to discount|Y
01|154734|3|2|on this quote.|Y
01|154741|1|1|** Reconfirm Center Height **|Y
01|154743|5|1|Includes 8 Hours of Installation & Training|Y
01|154743|11|1|Includes 8 Hours of Installation & Training|Y
01|154771|2|1|MSA1-99585 (Tentative #)|Y
01|154771|2|2|Z-axis Face milling New Capto4 DMG MORI|Y
01|154771|2|3|Internal & External coolant. Max 6000rpm|Y
01|154771|3|1|Max 10000 rpm|Y
01|154771|11|1|Min Order Qty. : 2|Y
01|154771|12|1|Min Order Qty. : 3|Y
01|154771|13|1|Min Order Qty. : 5|Y
01|154771|19|1|Min Order Qty: 1|Y
01|154771|20|1|Min Order Qty: 2|Y
01|154771|21|1|Min Order Qty: 3|Y
01|154771|22|1|Min Order Qty: 5|Y
01|154773|1|1|Special High Column table with 50MM riser.|Y
01|154773|3|1|Adapter plate for closer|Y
01|154773|5|1|B60 collet|Y
01|154773|6|1|B60 collet price|Y
01|154792|2|1|Please confirm center height 100mm before purchasing.|Y
01|154800|2|1|Price reflect Net charge|Y
01|154802|3|1|Installation includes: Daul axis drive short bar|Y
01|154802|3|2|fiber optic cables communications cables|Y
01|154802|3|3|external cables parameter changes service|Y
01|154802|3|4|time and travel.|Y
01|154809|1|1|Tool Certificate number:13860-2917-033121 remaining|Y
01|154809|1|2|balance on Tool Certificate 13860-2918-033121|Y
01|154820|1|1|Tooling certificate:250002921040521|Y
01|154820|5|1|wrenches included|Y
01|154820|7|1|wrenches included|Y
01|154823|2|1|Installation includes: drive unit short bar fiber|Y
01|154823|2|2|optic cables communication cables bulk head cable|Y
01|154823|2|3|set external cable set parameter changes service|Y
01|154823|2|4|time and travel.|Y
01|154823|4|1|Royal QCFC power chuck adapter plate.|Y
01|154833|1|1|Reference RGA# LVR-56832|Y
01|154833|1|2|Repair of NK103-12000 s/n: AL016 (Alps# NK103-12002)|Y
01|154833|2|1|Bearings o-rings collet nut and spindle to be|Y
01|154833|2|2|replaced.|Y
01|154834|2|1|Power Cable 10m(32ft)|Y
01|154834|3|1|Feedback Cable 10m(32ft)|Y
01|154834|5|1|Scale Mount Kit|Y
01|154848|28|1|This item is a non-standard stock item and is|Y
01|154848|28|2|considered special. Once ordered it cannot be canceled|Y
01|154848|28|3|or returned. Promo does not apply.|Y
01|154848|30|1|This item is a non-standard stock item and is|Y
01|154848|30|2|considered special. Once ordered it cannot be canceled|Y
01|154848|30|3|or returned. Promo does not apply.|Y
01|154849|1|1|Ladder and options to be installed by DMG Mori|Y
01|154849|1|2|Option 1: Dual spindle Table|Y
01|154849|2|1|Option 2: Single spindle table|Y
01|154849|4|1|NCT200 Angle Plate|Y
01|154857|1|1|TAR-56636|Y
01|154857|1|2|5AX-2MT-105-120FA-M SN: 8101|Y
01|154857|43|1|Tilt side casting|Y
01|154857|43|2|M2105R002|Y
01|154857|43|3|Pricing on this component is an estimate.|Y
01|154857|43|4|Actual pricing to be determined at a later date.|Y
01|154865|1|1|MODIFICATION-DSCREW-THREAD|Y
01|154865|2|1|NET cost.We can modify the thread on the blank draw|Y
01|154865|2|2|screw to the dimensions supplied by the customer|Y
01|154865|2|3|This is optional|Y
01|154906|5|1|NT50 taper center socket with manual draw bolt.|Y
01|154906|9|1|Installation includes: Drive unit short bar fiber|Y
01|154906|9|2|optic cable communications cable bulkhead cables|Y
01|154906|9|3|external cables parameter changes service time and|Y
01|154906|9|4|travel.|Y
01|154911|4|1|Spring Promo discount added to quote.|Y
01|154925|1|1|Includes (2) SF-POT-#40 CAT40 Pot/Chuck Holders|Y
01|154935|1|1|Repair of Alpha 21 Control 400W Series|Y
01|154935|1|2|TAR-56852|Y
01|154935|1|3|For CNC180A21 SN: 20759TH|Y
01|154935|1|4|CONTROLER SN: D0073B05361004|Y
01|154937|1|1|Table requires 500psi for the brake system.|Y
01|154937|2|1|Installation includes: Dual axis drvie unit short bar|Y
01|154937|2|2|fiber optic cables communications cables bulkhead|Y
01|154937|2|3|cables external cables parameter changes service|Y
01|154937|2|4|time and travel.|Y
01|154937|3|1|500psi pump with solenoid and pressure switch for|Y
01|154937|3|2|clamp-unclamp confirmation.|Y
01|154937|4|1|6+1 rotary union for thru the table casting hyraulics.|Y
01|154937|4|2|Max pressure 1000psi|Y
01|154939|8|1|Spring Promo 5% extra added to discount on this quote.|Y
01|154945|1|1|Reference RGA# TOR-56836|Y
01|154945|1|2|Repair of W1000-TC2-4.02(C)|Y
01|154947|1|1|CAT50 3/8 SHRINK-3.38 GL|Y
01|154947|1|2|C6Y3-0375 - Lyndex part # CAT50-SF0375-3.38CP|Y
01|154947|4|1|CAT50 3/8 SHRINK-5.00 GL|Y
01|154947|4|2|C6Y4-0375 - Lyndex part # CAT50-SF0375-5.00CP|Y
01|154949|2|1|EXTERNAL POWER CABLE SET - 1 ea AXIS|Y
01|154949|2|2|EXTERNAL FEEDBACK CABLE SET - 1 ea AXIS|Y
01|154958|1|1|HSK100A 27mm Face/Shell Mill Holdercurrent Nikken part|Y
01|154958|1|2|is HSK100A-FMC27-50|Y
01|154964|1|1|*Maxium insertion depth is 82mm|Y
01|154966|6|1|BT40-SK20-90P|Y
01|154966|6|2|BT40 SK20 Slim Chuck High Speed|Y
01|154974|4|1|Extra 5% promo discount applied|Y
01|154987|1|1|1st Batch/Stock  10/21 DWG approved by Andrew|Y
01|154998|1|1|Tool holder non-returnable|Y
01|155004|1|1|EC45-7/8 Quick Change End Mill Holder|Y
01|155004|2|1|EC45-3/4 Quick Change End Mill Holder|Y
01|155013|3|1|Spring Promo 10% extra added to the discount on this|Y
01|155013|3|2|quote.|Y
01|155016|1|1|2pc = 3 weeks and balance of 3pcs = 8 weeks|Y
01|155021|1|1|HSK100A-FMC27-50|Y
01|155030|1|1|ref. Howa part# HW-27M5JN|Y
01|155063|10|1|INSTALLATION AND TRAINING INCLUDE (2) 8 HOUR DAYS|Y
01|155063|10|2|TO INSTALL AND TRAIN IN PRESETTER AND TID.|Y
01|155063|14|1|INSTALLATION AND TRAINING FOR TID PER MACHINE|Y
01|155069|2|1|Please note pricing for these milling chucks was based|Y
01|155069|2|2|upon holders from our used shelf. Non-returnable.|Y
01|155069|3|1|Wrench is not included with milling chuck.|Y
01|155074|15|1|4 gl|Y
01|155105|10|1|Extra 5% Spring Promo discount applied|Y
01|155108|8|1|Promo applies to total amount quoted.|Y
01|155110|9|1|Extra 5% promotion applied|Y
01|155112|2|1|An additional 5% discount has been applied per our|Y
01|155112|2|2|Spring Hardwork Promo!|Y
01|155121|8|1|INCLUDES A TOTAL OF (2) EIGHT HOURS DAYS TO INSTALL|Y
01|155121|8|2|AND TRAIN ON THE PRESETTER.|Y
01|155122|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|155123|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|155136|4|1|Please note: Spring promo 5% extra added to discount on|Y
01|155136|4|2|this quote.|Y
01|155147|2|1|Net Price includes Balluff chip BIS-C-122-04/L and|Y
01|155147|2|2|installation for each holder. We will laser mark|Y
01|155147|2|3|the toolholders at no charge #CS-027-090-002|Y
01|155150|1|1|NON-STANDARD STOCK ITEMNON-RETURNABLENON-CANCELABLE|Y
01|155151|4|1|Includes: Bulkhead cables external cables parameter|Y
01|155151|4|2|changes service time and travel.|Y
01|155163|1|1|1-table stock 1-table 8-12 weekas ARO|Y
01|155163|2|1|16C dead lenght self-contained collet closer with|Y
01|155163|2|2|adapter plate.|Y
01|155169|2|1|Pricing is to Install (2) Rotary Tables on two seperate|Y
01|155169|2|2|Hyundai KF5600's in a single trip.|Y
01|155172|7|1|Stand for E460N|Y
01|155172|16|1|*OPTIONAL Presetter instalation and training for both|Y
01|155172|16|2|presetter units|Y
01|155172|18|1|*Comes with (2) free pots listed below|Y
01|155173|4|1|155460|Y
01|155173|5|1|155445|Y
01|155173|6|1|155455|Y
01|155173|7|1|121526|Y
01|155173|8|1|166789|Y
01|155173|10|1|for ER32I or ER32 attachment|Y
01|155173|11|1|for ER32I attach|Y
01|155173|12|1|for ER32 attach|Y
01|155180|15|1|Please Note: Spring Promo 10% extra has been added to|Y
01|155180|15|2|the discount on this quote. Purchase order must be|Y
01|155180|15|3|$5000.00 list and above to take advantage of this|Y
01|155180|15|4|promo. If quantities change please contact me for a|Y
01|155180|15|5|revised quote. Thank you!!|Y
01|155193|7|1|Sub Plate for mounting CNC180-2W-250BMA-M|Y
01|155193|7|2|This would be done in Japan prior to shipment|Y
01|155193|8|1|Riser Plate to fit x2 MT-135 tailstocks|Y
01|155193|8|2|and line up with CNC180-2W-250BMA-M|Y
01|155211|1|1|Req INS/Install E32-NUT & ER32-SCREW|Y
01|155211|2|1|1st Batch|Y
01|155211|3|1|1st Batch|Y
01|155211|4|1|1st Batch|Y
01|155211|5|1|1st Batch|Y
01|155211|6|1|1st Batch|Y
01|155211|7|1|1st Batch|Y
01|155211|8|1|Req INS/Install A3/8-24 3/4-KEYSET|Y
01|155211|9|1|Req INS/Repeat Order/872190 Trinity-Mill/GKN-NY|Y
01|155218|2|1|Installation includes: Drive unit short bar fiber|Y
01|155218|2|2|optic cable communications cable bulkhead cables|Y
01|155218|2|3|external cables parameter changes service time and|Y
01|155218|2|4|travel.|Y
01|155218|4|1|Installation inlcudes: Dual axis drvie unit short bar|Y
01|155218|4|2|fiber optic cables communications cables bulkhead|Y
01|155218|4|3|cables. external cables parameter changes service|Y
01|155218|4|4|time and travel.|Y
01|155225|4|1|Pricing is to Install (2) Rotary Tables on two seperate|Y
01|155225|4|2|Doosan DNM4500's in a single trip.|Y
01|155230|2|1|Front Mount self contained 5C collet closer with|Y
01|155230|2|2|adapter plate.|Y
01|155230|6|1|Pneumatic tailstock with MT3 center socket.|Y
01|155230|6|2|Center not included.|Y
01|155230|7|1|$1500.00 Free Tooling Promotion|Y
01|155236|7|1|$1500.00 Free Tooling Promotion|Y
01|155238|8|1|An additional 5% discount has been applied to the items|Y
01|155238|8|2|on this quotation per our Spring Hardwork Promo.|Y
01|155254|1|1|1st Batch|Y
01|155254|2|1|1st Batch|Y
01|155254|3|1|1st Batch|Y
01|155254|4|1|1st Batch|Y
01|155254|5|1|1st Batch|Y
01|155254|6|1|1st Batch|Y
01|155259|1|1|Sumitomo part #CT50-22-SMHCP|Y
01|155276|3|1|5% Price break reached|Y
01|155281|27|1|INCLUDES (1) EIGHT HOUR DAY FOR INSTALLATION AND|Y
01|155281|27|2|TRAINING|Y
01|155282|9|1|INCLUDES (1) DAY FOR INSTALLATION AND TRAINING|Y
01|155284|5|1|INCLUDES (1) DAY OF INSTALLATION AND TRAINING FOR|Y
01|155284|5|2|THE PRESETTER ONLY AND NOT THE TID SYSTEM|Y
01|155284|9|1|(1) 8 HOUR DAY TO INSTALL AND TRAIN FOR TID|Y
01|155284|14|1|(2) 8 HOUR DAYS TO INSTALL & TRAIN FOR 3 TIDS|Y
01|155285|3|1|Please Note: RFID BIS-C-122-04/L included with|Y
01|155285|3|2|modification-Chip install and Sikorsky part number|Y
01|155285|3|3|CS-027-728-008 etched on toolholder.|Y
01|155286|4|1|An additional 5% discount has been applied per our|Y
01|155286|4|2|Spring Hardwork Promo.|Y
01|155288|5|1|Quoted as an in stock option.|Y
01|155288|6|1|This collet can be used without a cap and coolant nut|Y
01|155291|1|1|Quote is based on standard pitch of 82mm|Y
01|155298|5|1|POSITIONING BLOCK FOR CAT50 HAAS CNC|Y
01|155302|6|1|TAT-250 support table with 170MM cneter height.|Y
01|155302|6|2|Riser required if using this with the CNC321|Y
01|155305|1|1|Table to be layed flat on its back.|Y
01|155305|1|2|Cables to be moutned on the end of the cover.|Y
01|155306|6|1|ZKG12-3|Y
01|155308|4|1|Please note: Spring promo 5% extra added to the|Y
01|155308|4|2|discount on this quote.|Y
01|155311|8|1|An additional 5% discount has been applied per our|Y
01|155311|8|2|Spring Hardwork Promo.|Y
01|155313|1|1|Seal Kit for H012M25 R-217|Y
01|155313|2|1|Check valve assy for H012M25 R-217|Y
01|155315|2|1|EXTERNAL POWER CABLE SET|Y
01|155315|2|2|EXTERNAL FEEDBACK CABLE SET|Y
01|155315|6|1|PNEUMATIC TS FOR USED WITH 5AX-201FA-M|Y
01|155315|6|2|WILL NEED 2 M COMMAND PORTS 1 FOR CONFIRMATION|Y
01|155315|6|3|1 FOR ACTIVATION.|Y
01|155315|6|4|SOLENOID INCLUDED AIR LINES AND CONNECTIONS ARE NOT|Y
01|155316|3|1|An additional 10% has been applied to these items|Y
01|155316|3|2|per our Spring Hardwork Promo.|Y
01|155317|1|1|$6000 ADD ON FOR 4000# TOWER CAPACITY|Y
01|155321|1|1|Calibration service for E578M Presetter at L-3 Combat|Y
01|155321|1|2|propulsion systems. This is a time based estimate.|Y
01|155321|1|3|9 hours of travel time x $110/hr. 4-6 hours of labor x|Y
01|155321|1|4|$135/hr. Also any expenses such as meals/fuel/hotel|Y
01|155321|1|5|costs to be charged as needed.|Y
01|155321|2|1|Preventative maintenance & Calibration preformed on|Y
01|155321|2|2|customer's E578M s/n: 1784|Y
01|155322|4|1|Please Note: Spring promo 5% extra added to discount|Y
01|155322|4|2|on this quote.|Y
01|155325|2|1|In stock option...NOT slotted|Y
01|155332|14|1|An additional 5% discount has been applied per our|Y
01|155332|14|2|Spring Hardwork Promotion.|Y
01|155342|1|1|Quote is based on standard pitch of 82mm|Y
01|155346|1|1|Quote is based on standard pitch of 82mm|Y
01|155357|16|1|*alt for SK10-5/32A|Y
01|155357|18|1|for NB3007-0016-2.36G|Y
01|155357|19|1|for NB3007-0016-2.36G|Y
01|155362|10|1|Promo applies to total amount quoted.|Y
01|155374|7|1|Promo applies to total amount quoted.|Y
01|155379|1|1|quoted as in stock option for line 2|Y
01|155387|8|1|NET priceno additional discount applied|Y
01|155387|8|2|Dimensions to be determined|Y
01|155392|1|1|KM42-15.70 KM42 Straight Collet/Sleeve 15.70mm|Y
01|155392|1|2|Non standard stock special not cancelable nor returnabl|Y
01|155392|1|3|once order is placed|Y
01|155394|1|1|KM42-15.70|Y
01|155396|7|1|Please Note: Spring promotion of 10% extra added to|Y
01|155396|7|2|the discount on this quote.|Y
01|155397|1|1|Repair quote for 5AX-201SA-BR2 SN: 5603|Y
01|155397|1|2|Support side was locked up needs support side rebuild|Y
01|155397|1|3|and some other seals.  Rotary and Tilt Backlash seem|Y
01|155397|1|4|good.|Y
01|155408|3|1|Additional 10% for list price over $5000 for|Y
01|155408|3|2|Spring Promotion.|Y
01|155409|11|1|Includes 8 Hours of Installation & Training|Y
01|155413|1|2|Quoted as NET pricingNon-returnable Non-cancelable|Y
01|155421|5|1|ADDITIONAL 10% OFF FOR SPRING PROMO|Y
01|155430|1|1|To be released in 3 shipments per GKN instuctions.|Y
01|155430|1|2|Repeat quote.|Y
01|155432|9|1|Extra 5% Spring Promo discount applied|Y
01|155434|1|1|Center Height = 100mm|Y
01|155442|1|1|Tooling Certificate Number:25000-2796-110620RT|Y
01|155442|1|2|Tooling Certificate Number:25000-2797-110620RT|Y
01|155455|1|1|Replacement for Lyndex-Nikken RGA: OIE:531108|Y
01|155456|2|1|Customer would need to make Riser.|Y
01|155469|1|1|13687-2863-020221|Y
01|155474|1|1|Cables Included - Delivery 1 to 2 weeks A.R.O.|Y
01|155476|4|1|Power and feedback cable set|Y
01|155487|1|1|PBA-150 CONFIRMATION KIT|Y
01|155487|1|2|COVER X2 PROX SENSORS PROX SENS. BRACKET & SCREWS|Y
01|155502|1|1|Non-returnable non-cancelable|Y
01|155502|4|1|Non-returnable non-cancelable|Y
01|155509|9|1|INCLUDES 2 EIGHT HOUR DAYS FOR INSTALLATION|Y
01|155509|9|2|AND TRAINING.|Y
01|155513|11|1|10% extra discount applied for 5k price break|Y
01|155518|1|1|(.069-.061)|Y
01|155518|11|1|An additional 5% discount has been applied per our|Y
01|155518|11|2|Spring Hardwork Promo.|Y
01|155534|1|1|Includes Haas Motor and Cable Set.|Y
01|155545|2|1|An additional 5% discount has been applied per our|Y
01|155545|2|2|Spring Hardwork Promo.|Y
01|155560|3|1|$500 list or more then Promo applies|Y
01|155569|1|1|Factory Part#HSK63A-HC1000-100|Y
01|155569|1|2|Desc:HSK63A Hyd. Chuck 1 GL 100mm|Y
01|155569|2|1|Factory Part#HSK63A-HC1000-100|Y
01|155569|2|2|Desc:HSK63A Hyd. Chuck 1 GL 100mm|Y
01|155569|4|1|Fatctory Part#HSK50A-HC1000-100|Y
01|155569|4|2|Desc:HSK50A Hyd. Chuck 1 GL 100mm|Y
01|155569|5|1|Fatctory Part#HSK50A-HC1000-100|Y
01|155569|5|2|Desc:HSK50A Hyd. Chuck 1 GL 100mm|Y
01|155586|10|1|Spring Promo of 5% has been added to the discount|Y
01|155586|10|2|on this quote.|Y
01|155589|6|1|Extra 10% Spring Promo|Y
01|155592|3|1|CAT50 Angle Head/ Central Back Offset Side Lock 16mm|Y
01|155592|3|2|3 Pin Support|Y
01|155592|3|3|L = 276.5mm|Y
01|155592|3|4|INT/EXT Coolant 1015 PSI|Y
01|155592|3|5|1:1 Gear Ratio 6500RPM|Y
01|155592|3|6|Ref. Drawing as Concept Only# 00058719|Y
01|155597|1|1|*1pc pricing|Y
01|155598|5|1|EXTRA 10% DISCOUNT FOR SPRING PROMO OVER $5K ORDERS|Y
01|155604|3|1|Old Style Junction Box Setup for 1 piece cables|Y
01|155606|11|1|EXTRA 5% DISCOUNT FOR ORDERS $500-$4999 LIST PRICE|Y
01|155606|11|2|SPRING PROMO PRICING|Y
01|155625|2|1|Spring Promo 5% extra added to discount on this quote.|Y
01|155633|59|1|Scale + Scale mount kit net price per axis|Y
01|155637|1|1|Replaces TO80927|Y
01|155638|59|1|Scale + Scale mount kit net price per axis|Y
01|155639|4|1|An additional 10% Discount has been applied per our|Y
01|155639|4|2|Spring Hardwork Promo.|Y
01|155646|1|1|HSK63A - Back spot facing tool|Y
01|155646|1|2|Material is 7075-T651 aluminum in T73 condition.|Y
01|155646|1|3|d is .218-.226 D is .455-.465 t is .455-.465|Y
01|155646|1|4|h is 2.5 inches|Y
01|155648|7|1|WE USUALLY PASS THIS PRICE ON TO THE CUSTOMER|Y
01|155670|3|1|Extra 10% Spring Promo discount applied|Y
01|155681|1|1|ETA 1ea3-4 weeks 1 ea pending|Y
01|155681|2|1|ETA 9-10 weeks|Y
01|155681|3|1|Charge will be determined based on the specifications|Y
01|155681|3|2|provided|Y
01|155691|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|155691|3|2|WE WILL NEED A COPY OF MACHINE WIRING DIAGRAM TO MAKE|Y
01|155691|3|3|THE CONNECTORS MATCH UP.|Y
01|155693|5|1|Spring Promo 5% extra added to the discount on this|Y
01|155693|5|2|quote.|Y
01|155697|1|1|Quoted as NET pricing non-returnable non-cancelable|Y
01|155697|1|2|QUOTED with NO makino pins|Y
01|155700|1|1|TC Q#155721|Y
01|155700|14|1|No AC version available|Y
01|155702|2|1|ETA 1 WK after design is completed|Y
01|155702|2|2|NET Pricing|Y
01|155712|18|1|Spring promo 5% extra added to discount on quote.|Y
01|155712|18|2|Order must be $500.00 list for promo.|Y
01|155729|1|1|Includes the following:|Y
01|155729|1|2|CNCZ100-2W + PB-105-2W + 1.8M CABLES + AIRLINE|Y
01|155731|5|1|Collet Range 1.0-10.0mm|Y
01|155731|14|1|Collet Range 3.0-16.0mm|Y
01|155731|22|1|An additional 10% Discount has been applied for orders|Y
01|155731|22|2|over $5000.00 per our Spring Hardwork Promo.|Y
01|155732|4|1|Quoted as an in stock length|Y
01|155737|2|1|EXTERNAL POWER CABEL SET|Y
01|155737|2|2|EXTERNAL FEED BACK CABLE SET|Y
01|155739|2|1|Installation inlcudes: Dual axis drive short bar|Y
01|155739|2|2|fiber optic cables communications cables bulkhead|Y
01|155739|2|3|cables external cables parameter changes service|Y
01|155739|2|4|time and travel.|Y
01|155743|9|1|(1) 8 HOUR DAY TO INSTALL AND TRAIN FOR TID|Y
01|155743|14|1|(2) 8 HOUR DAYS TO INSTALL & TRAIN FOR 3 TIDS|Y
01|155744|2|1|AIR/HYDRAULIC BOOSTER FOR ROTARY BRAKE|Y
01|155744|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|155748|5|1|INCLUDES (1) DAY OF INSTALLATION AND TRAINING FOR|Y
01|155748|5|2|THE PRESETTER ONLY AND NOT THE TID SYSTEM|Y
01|155749|2|1|CUSTOM SINGLE PIECE POSITIONING BLOCK FOR OKUMA|Y
01|155749|2|2|BRIDGE MILL.|Y
01|155749|2|3|WE WILL NEED TO GET EXACT SPINDLE FACE MEASUREMENTS|Y
01|155749|2|4|BEFORE WE CAN DESIGN THE POSITIONING BLOCK.|Y
01|155762|1|1|1 IN SHOWROOM AT MEXICO OFFICE|Y
01|155762|1|2|OTHERS ON ORDER DUE 6/2.|Y
01|155764|10|1|SF Cool Stops will be No Charge when the|Y
01|155764|10|2|START2-COOL-FAN40 is purchased|Y
01|155769|1|1|Reference RGA# TOR-56467|Y
01|155769|1|2|Repair of Tool#1 CAT50-UMT200|Y
01|155769|7|1|Repair of Tool#2 CAT50-UMT200|Y
01|155769|13|1|Repair of Tool#1 CAT50-UMT200|Y
01|155785|4|1|Promo 5% added to discount on this quote.|Y
01|155791|3|1|Extra 5% Spring Promo discount applied|Y
01|155803|8|1|Extra 5% Spring Promo discount applied|Y
01|155818|1|1|This items weighs 125-lbs.|Y
01|155818|2|1|This items weighs 97-lbs|Y
01|155828|1|1|2-tables 2-3 weeks ARO 2-tables 6 weeks for covers.|Y
01|155828|1|2|All tables are in stock .|Y
01|155839|1|1|5AX-1200WAA21-4444-RU77|N
01|155839|1|2|Nikken Alpha A21 Controllers Rotary and Tilt|Y
01|155839|1|3|Rotary Scales on both axis.|Y
01|155841|1|1|MZQT46-ER25X-AD-HS2-ICE|Y
01|155841|1|2|MIMATIC # 191272|Y
01|155841|1|3|NET PRICING|Y
01|155846|1|1|This is a replacement head.|Y
01|155857|14|1|***NEW VERSION_ with coolant ports***|Y
01|155877|1|1|C8-SZF16-105U|Y
01|155877|1|2|Polygon C8 Zero Type Slim Chuck SK16|Y
01|155884|1|1|BMT55-CAPTO3X-ICE|Y
01|155884|1|2|AGW-BMT-A-C3B-I|Y
01|155884|1|3|197599|Y
01|155892|1|1|ACH-ECH7F-60|Y
01|155892|2|1|AC5-ECH7F-90|Y
01|155897|1|1|1st Batch(2/2:DWG APRV by Andrew)/871088/W.C.Chapman|Y
01|155897|2|1|If Press-fit style pls add sticker.|Y
01|155902|2|1|Extra 5% Spring Promo discount applied|Y
01|155904|1|1|Tooling Certificate Number:|Y
01|155904|1|2|13687-2937-041521|Y
01|155904|41|1|B/O Collets KM1.1/4-3/16 KM1.1/4-5/16KM1.1/4-7/16|Y
01|155904|41|2|ETA 2-3 Days|Y
01|155904|42|1|B/O Collet KM1-7/8  ETA 1-2 WKS *CBO*|Y
01|155904|43|1|B/O Collet KM3/4-7/16 ETA 2-3 Days|Y
01|155905|2|1|Cap screw (M8x22) for HW-TN1-04-HS|Y
01|155921|1|1|HSK63A-MMC8C-175-AA|Y
01|155921|2|1|HSK63A-MMC12C-177-AA|Y
01|155929|6|1|10% additional has been applied as long as over|Y
01|155929|6|2|$5000 LIST|Y
01|155932|2|1|Part Number: TCD-G7004|Y
01|155947|8|1|Extra 5% Spring Promo discount applied|Y
01|155957|1|1|MZQT46-ER25X-AD-HS2-ICE|Y
01|155957|1|2|MIMATIC # 191272|Y
01|155957|1|3|NET PRICING|Y
01|155963|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|155964|1|1|HIGH SPEED CNC260 INDEXING AT 50RPM|Y
01|155964|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|155971|2|1|STANDARD BT30 SK25 COLLET CHUCK|Y
01|155971|3|1|BIG PLUS BT30 SK25 COLLET CHUCK|Y
01|155971|4|1|NON-SEALED STANDARD COLLET|Y
01|155971|5|1|MECHANICALLY SEALED COOLANT COLLET|Y
01|155971|8|1|STANDARD 25MM MILLING CHUCK|Y
01|155971|11|1|Extra 5% promo discount added|Y
01|155981|3|1|quoted as an in stock option|Y
01|155981|4|1|quoted as an in stock option|Y
01|155987|1|1|In stock at our home office - Mundelein IL|Y
01|155987|2|1|On the water from Germany ETA 5/7|Y
01|155996|7|1|10% extra discount applied for 5K price break|Y
01|155998|6|1|10% extra discount added - 5K price break|Y
01|156016|6|1|An additional 10% discount has been applied per our|Y
01|156016|6|2|Spring Promo.|Y
01|156019|4|1|Extra 10% Spring Promo Discount|Y
01|156020|1|1|P/N: HSK125A-C3/4-115|Y
01|156020|1|2|HSK125A Taper 3/4 Milling Chuck w/ 115mm gage length|Y
01|156029|3|1|EXTERNAL POWER CABLE SET|Y
01|156029|3|2|EXTERNAL FEEX BACK CABLE SET|Y
01|156036|2|1|Includes 4th axis Interfacecables and install|Y
01|156043|1|1|ETA 05/17|Y
01|156047|1|1|Part # CNC260BZA-M|Y
01|156047|1|2|Replacement Table for CNC250BZA SN: 3137|Y
01|156047|2|1|Replacement Cable Set - Need to confirm length and|Y
01|156047|2|2|Wiring of existing table|Y
01|156072|2|1|#162728 : CAT50 AGH;L=215mm; L1=109mm;|Y
01|156072|2|2|5000RPM; 150Nm;INT/ EXT COOLANT 1015PSI;|Y
01|156072|2|3|#171426: TORQUE ARM;ISO 9524|Y
01|156072|2|4|WRENCHES:WRENCH-MIM-107566 WRENCH-MIM-112867|Y
01|156072|2|5|eet Price No addtional discount|Y
01|156072|2|6|A drawing must be signed and sent back as approval|Y
01|156072|3|1|NET Price no additional discount.|Y
01|156080|16|1|*alt for SK10-5/32A|Y
01|156080|18|1|for NB3007-0016-2.36G|Y
01|156080|19|1|for NB3007-0016-2.36G|Y
01|156086|1|1|HSK63T-90-TH25N-80|Y
01|156086|1|2|HSK63 Turning Tool Square Tool Holder 90 degree|Y
01|156086|2|1|HSK63T-180-TH25R-115|Y
01|156086|2|2|HSK63 Turning Tool Square Right 180 degree|Y
01|156086|3|1|HSK63T-SLT8-75|Y
01|156086|3|2|HSK63 Turning Tool Round Tool Holder|Y
01|156086|4|1|HSK63T-SLT10-80|Y
01|156086|4|2|HSK63 Turning Tool Round Tool Holder|Y
01|156086|5|1|HSK63T-SLT16-100|Y
01|156086|5|2|HSK63 Turning Tool Round Tool Holder|Y
01|156086|6|1|HSK63T-SLT20-100|Y
01|156086|6|2|HSK63 Turning Tool Round Tool Holder|Y
01|156086|7|1|HSK63T-SLT25-105|Y
01|156086|7|2|HSK63 Turning Tool Round Tool Holder|Y
01|156086|8|1|HSK63T-SLT32-115|Y
01|156086|8|2|HSK63 Turning Tool Round Tool Holder|Y
01|156086|9|1|HSK63T-SLT40-135|Y
01|156086|9|2|HSK63 Turning Tool Round Tool Holder|Y
01|156088|1|1|Bearings / Seals|Y
01|156088|4|1|Labor cost: $110/hr.|Y
01|156089|1|1|Special R/Table CNCZ321MA s/n 9540|Y
01|156089|1|2|without Motor. Special Modification Cost Included.|Y
01|156089|2|1|Direct Cable|Y
01|156094|1|1|Includes cables from Table to Bulkhead|Y
01|156099|1|1|1FK70832AF711CH0|Y
01|156099|1|2|Table can be used vertically or horizontally.|Y
01|156099|1|3|Please specify table orientation when ordering.|Y
01|156099|2|1|Motor#1FK70422AF711CH0|Y
01|156101|1|1|1st Batch/for stock|Y
01|156113|1|1|Rotary union included.|Y
01|156113|2|1|KSP-160 with adapter plate and jaws.|Y
01|156113|2|2|`|N
01|156114|4|1|Extra 10% Spring Promo discount applied|Y
01|156116|1|1|H40E-SF0125-5.12|Y
01|156116|1|2|HSK40E 1/8 Shrink Fit w/ 5.12 gl|Y
01|156116|3|1|H40E-SF0187-5.12|Y
01|156116|3|2|HSK40E 3/16 Shrink Fit w/ 5.12 gl|Y
01|156123|3|1|Extra 5% Spring Promo discount applied|Y
01|156124|3|1|Alternative for 4 gage length|Y
01|156145|2|1|CAT40U-MOK16-160  CAT40 Coolant Inducer|Y
01|156145|2|2|Oil Hole Fluid Head SK16 Slim Chuck|Y
01|156147|1|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|156159|3|1|QUANTITY ORDER 1-2|Y
01|156159|4|1|QUANTITY ORDER 3-5|Y
01|156159|5|1|QUANTITY ORDER 6-9|Y
01|156160|7|1|10% extra discount applied for 5K price break|Y
01|156161|7|1|10% extra discount applied for 5K price break|Y
01|156168|1|1|OKLT-ER32Z-L-ICE|Y
01|156168|1|2|Mimatic # 124846|Y
01|156168|1|3|Non-returnablenon-cancelable|Y
01|156168|1|4|Quoted as NET pricing|Y
01|156169|1|1|Part#IT50-C25-105|Y
01|156170|7|1|Please note: Special one time only pricing. Net price|Y
01|156170|7|2|reflects non returnable tooling once installed into|Y
01|156170|7|3|spindle.|Y
01|156171|1|1|Without Motors. Please advise Motor Model #'s.|Y
01|156171|3|1|Cable management for B Axis.|Y
01|156176|8|1|ADDITIONAL 5% DISCOUNT FROM SPRING PROMO|Y
01|156177|7|1|ADDITIONAL 5% DISCOUNT FOR SPRING PROMO|Y
01|156186|1|1|50MM Thru Hole We can machine rear bearing cap and|Y
01|156186|1|2|bore ID with premission from Engineering|Y
01|156186|2|1|80 MM thru Hole this table will fit on 560V|Y
01|156186|2|2|The Height of table and tool lenghts would need to be|Y
01|156186|2|3|verified|Y
01|156186|3|1|For 5AX201|Y
01|156186|4|1|For 5ax350|Y
01|156186|5|1|For 5AX350|Y
01|156196|2|1|ST25-SK10-82-J|Y
01|156196|2|2|25mm STR EXT SK10 Slim Chuck with SKN-10KJ|Y
01|156196|3|1|NNTE: This part is included in ST25-SK10-82-J|Y
01|156203|1|1|Applied special price for ADVICS IN|Y
01|156203|2|1|CCK25-22|Y
01|156203|2|2|22mm collet|Y
01|156203|2|3|Applied special price for ADVICS IN|Y
01|156203|3|1|CKFN25-22C|Y
01|156203|3|2|22mm coolant cap|Y
01|156203|3|3|Applied special price for ADVICS IN|Y
01|156203|4|1|Applied special price for ADVICS IN|Y
01|156203|5|1|CKFN25-25DC|Y
01|156203|5|2|25mm coolant ring|Y
01|156203|5|3|Applied special price for ADVICS IN|Y
01|156203|6|1|Applied special price for ADVICS IN|Y
01|156203|7|1|CKFN25-25DC|Y
01|156203|7|2|25mm coolant ring|Y
01|156203|7|3|Applied special price for ADVICS IN|Y
01|156203|9|1|Applied special price for ADVICS IN|Y
01|156203|10|1|Applied special price for ADVICS IN|Y
01|156203|13|1|HSK63A-SF25-85|Y
01|156203|13|2|Heat shrink standard size|Y
01|156203|13|3|Applied special price for ADVICS IN|Y
01|156203|14|1|HSK63A-SF25-115|Y
01|156203|14|2|Heat shrink standard size|Y
01|156203|14|3|Applied special price for ADVICS IN|Y
01|156204|2|1|If they can use a 5/8 shank we have this A/H in stock.|Y
01|156216|1|1|10095586  H63A-SF-3.54CP|Y
01|156240|1|1|Ref:DWG#A198675|Y
01|156248|1|1|1st Batch|Y
01|156248|2|1|1st Batch|Y
01|156250|5|1|INCLUDES (1) 8 HOUR DAY FOR INSTALLATION & TRAINING|Y
01|156250|11|1|INCLUDES (1) 8 HOUR DAY FOR INSTALLATION & TRAINING|Y
01|156258|1|1|with J-Nut: SKN-20BJ|Y
01|156266|1|1|Customers Material: Chip Holes Only Added to Tooling.|Y
01|156272|1|1|SN: 100481|Y
01|156272|1|2|Display Presetter at Makerspace Hartford CT|Y
01|156272|1|3|PO must be sent to justinh@lyndexnikken.com|Y
01|156321|1|1|Req INS/Install SKN-16B|Y
01|156321|2|1|Req INS/Install E16-NUT & ER16-SCREW(C)|Y
01|156321|3|1|Req INS/Install E32-NUT & ER32-SCREW(C)|Y
01|156325|15|1|Discount on above knob relfects onetime special pricing|Y
01|156329|18|1|P/N: KM2-1.1/8|Y
01|156329|20|1|P/N: KM2-1.3/8|Y
01|156343|1|1|ETA 05/17|Y
01|156343|2|1|ETA 05/17|Y
01|156350|1|1|Delivery - ETA to Lyndex Nikken is 05/07/2021|Y
01|156350|1|2|Estimated Delivery - We can not control delivery from|Y
01|156350|1|3|Port of entry to our plant|Y
01|156356|2|1|Extra 5% spring proo discount applied|Y
01|156358|6|1|NET PRICE|Y
01|156365|7|1|This item has been discontinued once ordered it|Y
01|156365|7|2|cannot be returned.|Y
01|156366|2|1|Non-returnable non-cancelable|Y
01|156366|2|2|ETA 2 weeks after 5/9/21|Y
01|156383|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|156388|14|1|***NEW VERSION_ with coolant ports***|Y
01|156397|1|1|H100A-SF0125-6.30CP  w/ bodies of 1/4 holder per print|Y
01|156397|2|1|H100A-SF0187-6.30CP w/ bodies of 1/4 holder per print|Y
01|156404|1|1|HA40L-ER32X-ICE #192625|Y
01|156404|1|2|Haas Live VDI X-Axis 90DEG ER32 IntC <Radial>|Y
01|156404|1|3|NET price no extra discount|Y
01|156404|1|4|ETA 4-6 Weeks|Y
01|156404|2|1|HA40L-ER32Z-ICE #192617|Y
01|156404|2|2|Haas Live VDI40 Z-Axis Str ER32 IntC7MP <Axial>|Y
01|156404|2|3|NET price no additional discount|Y
01|156404|2|4|ETA 4-6 WEEKS|Y
01|156407|13|1|An additional 10% discount has been applied per our|Y
01|156407|13|2|Spring Hardwork Promo.|Y
01|156410|1|1|Customers Material >> RGA: MOD-|Y
01|156410|1|2|(3) 14371629 HSK100A-PHC12SA-195H|Y
01|156410|1|3|(4) 14371637 HSK100A-PHC-16SA-195H|Y
01|156410|1|4|(4) 14371777 HSK100A-PHZ08S-195H|Y
01|156410|1|5|(3) 14371793 HSK100A-PHZ12S-195H|Y
01|156414|2|1|balanced to 24000 rpm|Y
01|156449|7|1|10% extra discount applied for 5K price break|Y
01|156452|3|1|DRAWTUBE ID & THREAD PITCH MEASUREMENTS WILL NEED|Y
01|156452|3|2|TO BE TAKEN. EACH MACHINE CAN BE DIFFERENT. CARDINAL|Y
01|156452|3|3|DID NOT HAVE THOSE DIMENSIONS. IF THOSE DIMENSIONS|Y
01|156452|3|4|ARE MEASURED ON THE MACHINE WE CAN TURN THE THREADS|Y
01|156452|3|5|ON THE DRAWSCREW FOR $300 NET PER TUBE. OTHERWISE|Y
01|156452|3|6|THE CUSTOMER CAN MACHINE THEM IN HOUSE.|Y
01|156452|5|1|25% ADDITIONAL DISCOUNT FOR WORKHOLDING PROMO|Y
01|156460|26|1|Extra 5% Spring Promo discount applied|Y
01|156466|1|1|Please note if this set is ordered you can receive an|Y
01|156466|1|2|additional 5% Spring Promo discount bringing the|Y
01|156466|1|3|discount to 33% from 28%|Y
01|156467|1|1|Please note if this set is ordered you can receive an|Y
01|156467|1|2|additional 5% Spring Promo discount bringing the|Y
01|156467|1|3|discount to 39% from 34%|Y
01|156475|1|1|IT50-SK6-105 Good Nikken partin stock|Y
01|156475|2|1|IT50-SK6-135 Good Nikken partin stock|Y
01|156475|3|1|IT50-SK6-165 Good Nikken partin stock|Y
01|156476|59|1|Scale + Scale mount kit net price per axis|Y
01|156478|9|1|*Option|Y
01|156478|9|2|NET PRICE|Y
01|156478|19|1|*Option|Y
01|156478|19|2|NET PRICE|Y
01|156486|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|156491|2|1|Extra 5% Spring Promo Discount Applied|Y
01|156497|39|1|This item is considered special once ordered it|Y
01|156497|39|2|cannot be cancelled or returned.|Y
01|156497|39|3|PROMO DOES NOT APPLY|Y
01|156497|63|1|This item is considered special once ordered it|Y
01|156497|63|2|cannot be cancelled or returned.|Y
01|156497|63|3|PROMO DOES NOT APPLY|Y
01|156500|1|1|Face Value $400000.00|Y
01|156500|2|1|Sales tax at a rate of 9.250% for tooling|Y
01|156502|1|1|2 IN STOCK|Y
01|156502|1|2|LEAD TIME IS FOR TABLE INSPECTION AND SHIPPING PREP|Y
01|156502|2|1|EXTERNAL POWER CABLE SET|Y
01|156502|2|2|EXTERNAL FEED BACK CABLE SET|Y
01|156502|4|1|USING EXISTING SERVO AMP AND INTERFACE CABLE SET|Y
01|156502|4|2|INSTALL CAN BE SOONER DETERMINED AT TIME OF PO|Y
01|156504|1|1|1 LEFT IN STOCK|Y
01|156504|1|2|LEAD TIME IS FOR TABLE INSPECTION AND SHIPPING PREP|Y
01|156504|2|1|EXTERNAL POWER CABLE SET|Y
01|156504|2|2|EXTERNAL FEED BACK CABLE SET|Y
01|156504|4|1|USING EXISTING SERVO AMP AND INTERFACE CABLE SET|Y
01|156504|4|2|INSTALL CAN BE SOONER DETERMINED AT TIME OF PO|Y
01|156507|2|1|EXTERNAL FEEDBACK CABLE SET|Y
01|156507|2|2|EXTERNAL POWER CABLE SET|Y
01|156513|1|1|1st Batch/for stock  1/22 Andrew approved|Y
01|156515|1|1|BT30-FMH27-60-45 BT30 Face Mill Holder|Y
01|156515|1|2|Quoted at NET Price no extra discount will be applied|Y
01|156516|5|1|Installation inlcudes: Drive unit short bar fiber|Y
01|156516|5|2|optic cables communications cables bulkhead cables|Y
01|156516|5|3|external cables parameter changes service time|Y
01|156516|5|4|and travel.|Y
01|156522|2|1|INSTALLATION OF 3 TABLES WILL TAKE APPROXIMATELY|Y
01|156522|2|2|1 WEEK TO COMPLETE. THE INSTALLATION CHARGE INCLUDES:|Y
01|156522|2|3|AMPLIFIERS CABLES FIBER OPTICS AND ALL HARDWARE|Y
01|156522|2|4|TO COMPLETE THE INSTALLATION OF (3)5AX-2MT TABLES|Y
01|156522|2|5|ON YOUR MORI NV5000 VMC MACHINES. THE INSTALLATION|Y
01|156522|2|6|CHARGE ALSO COVERS TRAVEL LODGING AND LABOR COST|Y
01|156522|2|7|FOR ONE WEEK FOR OUR INSTALLATION TECHNICIAN.|Y
01|156529|3|1|DRAWTUBE ID & THREAD PITCH MEASUREMENTS WILL NEED|Y
01|156529|3|2|TO BE TAKEN. EACH MACHINE CAN BE DIFFERENT. CARDINAL|Y
01|156529|3|3|DID NOT HAVE THOSE DIMENSIONS. IF THOSE DIMENSIONS|Y
01|156529|3|4|ARE MEASURED ON THE MACHINE WE CAN TURN THE THREADS|Y
01|156529|3|5|ON THE DRAWSCREW FOR $300 NET PER TUBE. OTHERWISE|Y
01|156529|3|6|THE CUSTOMER CAN MACHINE THEM IN HOUSE.|Y
01|156529|5|1|25% ADDITIONAL DISCOUNT FOR WORKHOLDING PROMO|Y
01|156532|2|1|Installation inlcudes: Dual axis drive unit short bar|Y
01|156532|2|2|fiber optic cables communications cables bulkhead|Y
01|156532|2|3|cables external cables parameter changes service|Y
01|156532|2|4|time and travel.|Y
01|156532|7|1|Installation inlcudes: Dual axis drive unit short bar|Y
01|156532|7|2|fiber optic cables communications cables bulkhead|Y
01|156532|7|3|cables external cables parameter changes service|Y
01|156532|7|4|time and travel.|Y
01|156534|2|1|Direct chuck capability|Y
01|156534|5|1|Need to purchase collet if do not already have|Y
01|156554|2|1|4th&5th axis Power and Feedback cables to Machine Bulk|Y
01|156554|2|2|Head|Y
01|156554|3|1|4th&5th Axis Interface and 3rd Party Software to be|Y
01|156554|3|2|Purchased and installed by HFO. This price includes|Y
01|156554|3|3|Lyndex Nikken Install and set up once your machine has|Y
01|156554|3|4|the required options installed from HFO.|Y
01|156582|1|1|Repair RGA#TOR-56823|Y
01|156582|1|2|Repair of N5005-1375-6.77|Y
01|156591|1|1|1.083 Nose Diamter|Y
01|156600|1|1|TABLE IS IN STOCK - INSPECTION AND SHIPPING PREP|Y
01|156600|1|2|LEAD TIME IS 3 WEEKS.|Y
01|156600|2|1|2 EA - EXTERNAL POWER CABLE SET|Y
01|156600|2|2|2 EA - EXTERNAL FEED BACK CABLE SET|Y
01|156613|1|1|Tooling Certificate Number:|Y
01|156613|1|2|13687-2949-042821|Y
01|156613|12|1|Part#E32-034 ER32 17/32In B/O ETA 6/14|Y
01|156613|13|1|***OPTION to fill missing 17/32 collet***|Y
01|156615|3|1|NCAT40-SK20C-90UP-IDI w/ chip BIS-C-122-04/L|Y
01|156615|4|1|Chip Install & Rebalance|Y
01|156620|1|1|Tooling Certificate Number:13705TA-2962-051221|Y
01|156620|2|1|For 10MM Endmill|Y
01|156620|7|1|For M8 Form Tap and Flow Drill|Y
01|156622|2|1|Offered as an in stock option.|Y
01|156624|7|1|One time Discount applied|Y
01|156629|1|1|Value Determined by Quote # 156620|Y
01|156632|18|1|INCLUDES (1) DAY FOR INSTALLATION AND TRAINING|Y
01|156669|1|1|We will need to know if PSA would like the face plate|Y
01|156669|1|2|with T slots or Bolt holes|Y
01|156669|2|1|Power & Feedback Cables from Rotary to Machine|Y
01|156669|2|2|Bulkhead|Y
01|156669|3|1|Option 1 - Live Spindle Tailstock with MT2 Connection|Y
01|156669|3|2|For end support fixture designed and supplied by PSA|Y
01|156669|3|3|Stock - will ship with Tables|Y
01|156669|4|1|Option 2- Live Spindle Tailstock with MT3Connection|Y
01|156669|4|2|For PSA end support fixture|Y
01|156669|4|3|Stock - will ship with tables|Y
01|156669|5|1|Option 3 - Live Spindle Tailstock - MT3 Connection|Y
01|156669|5|2|Confirmation Switch|Y
01|156669|5|3|Stock will ship with Tables|Y
01|156669|7|1|Unit Mounts directly to NCT200 Table Pic sent to PSA|Y
01|156673|5|1|Extra 10% Spring Promo Discount applied|Y
01|156673|5|2|If PO placed is less than $5000 total the discount will|Y
01|156673|5|3|be only 5%|Y
01|156676|1|1|79335  CV50-CC3.50-1000|Y
01|156676|1|2|Discount applies for all quantities|Y
01|156677|1|1|3.3 MM Drill and 4.m tap|Y
01|156677|2|1|both .250 diameter tools|Y
01|156677|6|1|.125 ballmill|Y
01|156677|8|1|both 1/2 dia tools|Y
01|156677|10|1|3/4 Endmill|Y
01|156680|1|1|IT50X-SK6-105P  SK50 taper SK6 Slim Chuck High Speed|Y
01|156680|3|1|IT50X-SK16-165P  SK50 SK16 Slim Chuck High Speed|Y
01|156689|6|1|An additional 10% discount has been applied for orders|Y
01|156689|6|2|over $5000 per our Spring Promo.|Y
01|156691|1|1|Lyndex Nikken Part # MZMP47-ER32X-OFF-HS2|Y
01|156691|1|2|Mazak LIve; VDI40 ER32 Offset|Y
01|156691|1|3|1 pcs ETA 2-3 Weeks. 2 pcs ETA 4-6 Weeks|Y
01|156691|1|4|Balance 9-10 Weeks|Y
01|156692|5|1|I only have 4 of the old part number in stock. New part|Y
01|156692|5|2|number B4007-0020-4.00 not due until mid September.|Y
01|156694|11|1|This price is for this quote & these 2 pieces only|Y
01|156694|54|1|IT50X-SK16-165P  SK50 SK16 Slim Chuck High Speed|Y
01|156694|56|1|IT50X-SK6-105P  SK50 taper SK6 Slim Chuck High Speed|Y
01|156694|59|1|IT50X-SK6-165P  SK50 SK6 Slim Chuck High Speed|Y
01|156695|2|1|EXTERNAL POWER CABLE SET|Y
01|156695|2|2|EXTERNAL FEEDBACK CABLE SET|Y
01|156701|11|1|Direct replacement part # for CAT40-SF0500-3.15|Y
01|156701|12|1|Replaces part #C40R5-0562-3.02|Y
01|156714|1|1|1st Batch|Y
01|156717|1|1|260MM table for hydraulic braking|Y
01|156717|3|1|220 3-phase power|Y
01|156719|4|1|Extra 5% Spring Promo discount applied|Y
01|156740|5|1|Alternate for 27/64|Y
01|156767|1|1|INS Req/858934 A&M/GKN-NY - REPEAT *Install set screws|Y
01|156767|2|1|1st Batch|Y
01|156767|3|1|1st Batch|Y
01|156767|4|1|1st Batch|Y
01|156767|5|1|1st Batch|Y
01|156767|6|1|1st Batch|Y
01|156767|7|1|1st Batch|Y
01|156767|8|1|1st Batch|Y
01|156767|9|1|INS Req/Repeat SP 874347 Wm. F. Hurst/GKN-KS|Y
01|156781|3|1|Please Note: This end mill holder is discontinued.|Y
01|156781|3|2|I have one in stock and it is pre-balanced and|Y
01|156781|3|3|balanceable.|Y
01|156801|6|1|5% extra discount provided for $500 price break.|Y
01|156820|2|1|1 set of 3MM master jaws for an H01MA12-A8J|Y
01|156841|1|1|Ref Part#: PSB-1T PSB-1T-AHO|Y
01|156841|2|1|Ref Part#: PSB-26|Y
01|156841|2|2|Applied special price for ADVICS IN|Y
01|156841|3|1|Ref Part#: PSB-0-OH|Y
01|156841|3|2|Applied special price for ADVICS IN|Y
01|156844|9|1|Extra 10% Spring Promo discount applied.|Y
01|156844|9|2|Order placed must exceed $5000 or discount will drop|Y
01|156844|9|3|to extra 5%|Y
01|156848|1|1|w/ chip BIS-C-122-04/L|Y
01|156848|2|1|Install chip / Re-balance|Y
01|156848|4|1|w/ chip BIS-C-122-04/L|Y
01|156848|5|1|Install chip / Re-balance|Y
01|156848|7|1|w/ chip BIS-C-122-04/L|Y
01|156848|8|1|Install chip / Re-balance|Y
01|156854|5|1|OKL3-SK20X-ICE-G|Y
01|156854|5|2|Okuma Live X-Axis 90Deg SK20 IntC 7MP 6000rpm DIN|Y
01|156854|5|3|with High Speed Nut (SKN-20B(GH))|Y
01|156859|1|1|5500 Max RPM Not exact but comparable to Royal 44034|Y
01|156859|2|1|We can provide threading at NET charge.Required thread|Y
01|156859|2|2|dimensions will need to be provided to our service dept|Y
01|156867|5|1|Quoted as an in stock opotion see good/better/best|Y
01|156875|1|1|Collets on Back Order Part#500-024 3/8In Part#5/8In|Y
01|156889|1|1|MAS P45T-1|Y
01|156891|3|1|Note - the Pilot must match enduser 2 Face Mill|Y
01|156891|3|2|We have .750 Pilot 1.0 inch and 1.250 pilot|Y
01|156903|1|1|Quoted at Net Price|Y
01|156903|3|1|Quoted at Net Price|Y
01|156906|1|1|ICE - Can run dryexternal coolant or Internal Coolant|Y
01|156906|1|2|Dry is nice for dry run thru your program so you can|Y
01|156906|1|3|see in the machine.|Y
01|156906|2|1|External Coolant Only|Y
01|156922|1|1|NT55-CAPTO3X-MD REF drwg # 00058822|Y
01|156922|1|2|Machine: NTY(3)-250 & NTY(3)-150|Y
01|156922|1|3|MIM Q#A21101694|Y
01|156922|3|1|NT55-CAPTO3X-MD REF drwg # 00058822|Y
01|156922|3|2|Machine: NTY(3)-250 & NTY(3)-150|Y
01|156922|3|3|MIM Q#A21101694|Y
01|156922|5|1|NT55-CAPTO3X-MD REF drwg # 00058822|Y
01|156922|5|2|Machine: NTY(3)-250 & NTY(3)-150|Y
01|156922|5|3|MIM Q#A21101694|Y
01|156926|2|1|CAPTO C6; 3PINS SUPPORT;|Y
01|156926|2|2|1 ARBOR|Y
01|156926|2|3|L1=1220mm;|Y
01|156926|2|4|2/1 GEAR MAX 90Nm;|Y
01|156926|2|5|MAX 2500RPM INPUT|Y
01|156926|2|6|MAX 1250 RPM OUTPUT|Y
01|156926|2|7|REF CONCEPT DWG# 00057809|Y
01|156929|1|1|1st Batch|Y
01|156929|2|1|1st Batch|Y
01|156929|3|1|1st Batch|Y
01|156929|4|1|1st Batch|Y
01|156929|5|1|1st Batch|Y
01|156929|6|1|1st Batch|Y
01|156929|7|1|1st Batch|Y
01|156929|8|1|1st Batch|Y
01|156929|9|1|1st Batch|Y
01|156941|1|1|#198673 = BT50 AGH; ER32; NO COOLANT;L:180mm;L170mm|Y
01|156941|1|2|1/1 GEAR MAX RPM 6500RPM; REF DRWG #00046179|Y
01|156941|1|3|INCLUDES:#112900:WRENCH-MIM-112900 NUT WRENCH and|Y
01|156941|1|4|#107642 WRENCH-MIM-1407642 SPINDLE  WRENCH|Y
01|156941|1|5|Curvic Coupling Supplied by Mueller will be used|Y
01|156941|1|6|for assembly at the factory|Y
01|156941|1|7|Lead Time 3 Weeks for Final Design Drawing 6-8 weeks|Y
01|156941|1|8|for manufacture of head attachment & then air shipment|Y
01|156941|1|9|from factory to Lyndex Nikken. Normally 2 Weeks|Y
01|156941|1|10|since it has to go through customs at Ohare.|Y
01|156959|5|1|This option will not work on an Erickson Quick Change|Y
01|156966|1|1|Tooling Certificate Number:|Y
01|156966|1|2|25000-2867-020321RT|Y
01|156966|1|3|25000-2906-031921RT|Y
01|156999|5|1|Has collapsible range of 5/32-9/64ths|Y
01|156999|7|1|Extra 5% Spring Promo discount applied.|Y
01|157008|4|1|Take an additional 5% off if over $500 & an additional|Y
01|157008|4|2|10% if over $5000.00|Y
01|157014|2|1|ETA 9/30/21|Y
01|157014|4|1|ETA 3-4 weeks|Y
01|157014|6|1|ETA 3-4 Weeks|Y
01|157022|36|1|Extra 10% Spring Promo discount applied|Y
01|157032|2|1|CNC803TOS R/Table 800mm Right W/O Toshiba Motor|Y
01|157032|3|1|Installation fee is not included. Estimate will be|Y
01|157032|3|2|provided after details are confirmed.|Y
01|157032|6|1|CNC1003TOS R/Table1000mm Right W/O Toshiba Motor|Y
01|157032|7|1|Installation fee is not included. Estimate will be|Y
01|157032|7|2|provided after details are confirmed.|Y
01|157032|11|1|Angle Plate for vertical use of CNC1600TOS|Y
01|157032|13|1|Installation fee is not included. Estimate will be|Y
01|157032|13|2|provided after details are confirmed.|Y
01|157037|1|1|*Reconfirm Center Height*|Y
01|157039|9|1|Alternate for 27/64|Y
01|157081|2|1|Replaces SKN-6WBJ(GH)|Y
01|157094|1|1|Please order part# NCAT40-SK16C-60UP-IDI|Y
01|157094|1|2|NCAT40-SK16C-60UP-IDU + BIS-C-122-04/L + Install Chip|Y
01|157102|22|1|SPECIAL TAPER - H100A-SF0375-4.00|Y
01|157102|22|2|LARGER BASE - SMALLER NOSE|Y
01|157102|23|1|SPECIAL TAPER - H100A-SF0750-4.00|Y
01|157102|23|2|LARGER BASE - SMALLER NOSE|Y
01|157102|24|1|SPECIAL TAPER - HSK100A-ER16-6.00|Y
01|157102|24|2|LARGER BASE - SMALLER NOSE|Y
01|157102|27|1|HSK100A-ER40-8.00|Y
01|157102|27|2|NOT A STANDARD FOR LN|Y
01|157102|28|1|HSK100A-ER40-10.00|Y
01|157102|28|2|NOT A STANDARD FOR LN|Y
01|157102|29|1|H100A-SF0375-8.00|Y
01|157102|29|2|NOT A STANDARD FOR LN|Y
01|157102|30|1|H100A-SF0500-7.00|Y
01|157102|30|2|NOT A STANDARD FOR LN|Y
01|157102|31|1|H100A-SF0500-8.00|Y
01|157102|31|2|NOT A STANDARD FOR LN|Y
01|157102|32|1|H100A-SF0750-5.00|Y
01|157102|32|2|NOT A STANDARD FOR LN|Y
01|157102|33|1|H100A-SF0750-7.00|Y
01|157102|33|2|NOT A STANDARD FOR LN|Y
01|157102|34|1|H100A-SF0750-8.00|Y
01|157102|34|2|NOT A STANDARD FOR LN|Y
01|157102|35|1|H100A-SF0625-5.00|Y
01|157102|35|2|NOT A STANDARD FOR LN|Y
01|157102|36|1|H100A-SF0625-7.00|Y
01|157102|36|2|NOT A STANDARD FOR LN|Y
01|157102|37|1|H100A-SF0625-8.00|Y
01|157102|37|2|NOT A STANDARD FOR LN|Y
01|157102|38|1|H100-SF1000-5.00|Y
01|157102|38|2|NOT A STANDARD FOR LN|Y
01|157102|39|1|H100A-SF1000-8.00|Y
01|157102|39|2|NOT A STANDARD FOR LN|Y
01|157114|7|1|Quoted at Net pricing|Y
01|157120|16|1|Replaces part #C40S5-0562-2.93(see attached drawing)|Y
01|157120|18|1|ETA 2 weeks|Y
01|157135|6|1|Please Note: Quoted at NET price.|Y
01|157140|16|1|We only have 4 pieces in stock. Once these are gone|Y
01|157140|16|2|new part number is B4007-0025-4.00 del: mid to end Aug.|Y
01|157140|17|1|This holder is a 4 gage length pre-balanced and|Y
01|157140|17|2|balanceable.|Y
01|157150|1|1|Reference RGA# TOR-56887|Y
01|157150|1|2|Repair of 1 x SF-START2-UNIT-200 s/n: 2J179|Y
01|157150|3|1|This is optional.|Y
01|157157|1|1|Reference RGA# LVR-56973|Y
01|157157|1|2|Repair of MNZ20-SK16X-ICE-12K s/n: 19902304 02|Y
01|157157|1|3|(Mimatic# 193568)|Y
01|157157|2|1|Bearings seals o-rings and spindle to be replaced.|Y
01|157169|2|1|This is a non standard stock item and is considered|Y
01|157169|2|2|special once ordered it cannot be canceled or returned|Y
01|157172|16|1|We only have 4 pieces in stock. Once these are gone|Y
01|157172|16|2|new part number is B4007-0025-4.00 del: mid to end Aug.|Y
01|157172|17|1|This holder is a 4 gage length pre-balanced and|Y
01|157172|17|2|balanceable.|Y
01|157178|1|1|** Draw nut supplied w/out thread|Y
01|157178|1|2|Additional cost for threading|Y
01|157181|1|1|5AX-201FA-M SN: 5494|Y
01|157181|1|2|TAR-56971|Y
01|157181|25|1|BE3908E01X2|Y
01|157181|27|1|WP-13|Y
01|157181|35|1|NIK-1555-300|Y
01|157186|1|1|*more than 10pcs 12 weeks|Y
01|157186|2|1|HSK100A-C1.1/4 gage length 200mm|Y
01|157186|3|1|HSK100A-C1.1/4 gage length 250mm|Y
01|157186|4|1|HSK100A-C3/4 gage length 165mm|Y
01|157186|5|1|HSK100A-C3/4 gage length 200mm|Y
01|157186|6|1|HSK100A-C3/4 gage length 250mm|Y
01|157192|1|1|If Press-fit style add sticker.|Y
01|157192|2|1|1st Batch(w/ScrewOnKey)|Y
01|157217|1|1|Modification of CNC180LMA -> CNC180LOSP4-M|Y
01|157217|1|2|SN: 5053|Y
01|157217|1|3|Convert to Okuma New Machine Specification|Y
01|157233|3|1|In stock alternative to B/O 3 GL|Y
01|157235|4|1|3000psi 4 port rotary union|Y
01|157235|5|1|3000PSI hydraulic power unit w solenoid/pressure switch|Y
01|157237|1|1|We will need to know if PSA would like the face plate|Y
01|157237|1|2|with T slots or Bolt holes|Y
01|157237|2|1|Power & Feedback Cables from Rotary to Machine|Y
01|157237|2|2|Bulkhead|Y
01|157237|4|1|12 Month extended warranty - Parts only does not|Y
01|157237|4|2|include Haas Servo Motor or Cables to bulkhead|Y
01|157237|4|3|Free on this Purchase Order|Y
01|157244|1|1|Reference RGA# TOR-56413|Y
01|157244|1|2|Refurbishment of E450 s/n: 3424|Y
01|157244|2|1|The following replacements/repair/revision included.|Y
01|157244|2|2|Micrometric set spindle holder 675mm slide scale|Y
01|157244|2|3|optics revision PV2 LCD display SIX/E46L counter-|Y
01|157244|2|4|weight springs Sethy/hathor/khyan preset micrometric|Y
01|157244|2|5|set 66B/68B counterweight spring P238/PV2/PV2N LCD|Y
01|157244|2|6|set taper gear sethy/hathor/khyan/E450/six 206V/506V|Y
01|157244|2|7|LCD protection E450 test/inspection/certification|Y
01|157244|3|1|Ship to Elbo Controlli in Italy|Y
01|157244|4|1|Ship from Elbo Controlli in Italy|Y
01|157245|1|1|Price for 1-2 Units|Y
01|157245|2|1|Qty. 3-5pcs Price Break|Y
01|157247|2|1|ref. old part# B3017-0016-4.00|Y
01|157247|3|1|ref. old part# B3027-0016-5.00|Y
01|157247|7|1|**gage length of 3.54|Y
01|157247|7|2|**pre-balanced and balanceable (balance holes on flg)|Y
01|157247|8|1|for B3017-0016B balance holder|Y
01|157247|10|1|**gage length of 100mm/3.93|Y
01|157248|4|1|5% discount added for $500 price break|Y
01|157249|1|1|TAR-56848|Y
01|157249|1|2|5AX-2MT-170-200FA SN: 2003|Y
01|157249|27|1|GR-M2201R023|Y
01|157249|28|1|GR-M2201R024|Y
01|157249|29|1|External Cable Set - Rotary|Y
01|157249|54|1|GR-CN260R27|Y
01|157249|55|1|External Cable Set|Y
01|157252|9|1|5% added for $500 price break|Y
01|157257|3|1|Gave extra 5% to incentivise to buy the set today I/O|Y
01|157257|3|2|wating for the restock|Y
01|157257|4|1|Gave extra 5% to incentivize buying now rather than|Y
01|157257|4|2|waiting for B/O items|Y
01|157267|1|1|1st Batch/(2)863442  4/15/20:DWG Approved.|Y
01|157272|19|1|*customer would need to machine to desired size|Y
01|157273|10|1|Promo effective till 06/30/2021|Y
01|157273|10|2|10% added for 5K price break|Y
01|157276|5|1|Extra 10% Spring Promo discount applied|Y
01|157279|5|1|Extra 10% Spring Promo discount applied|Y
01|157292|11|1|Promo effective till 06/30/2021|Y
01|157292|11|2|10% added for 5K price break|Y
01|157306|15|1|extra 10% discount for order being over $5000|Y
01|157308|5|1|An extra 5% will be applied if all 5 collets are|Y
01|157308|5|2|ordered at the same time on one PO|Y
01|157312|1|1|PHILLIPS TO SUPPLY MOTOR AND CABLES FOR LYNDEX NIKKEN|Y
01|157312|1|2|TO MOUNT. SHORTER MOTOR COVER TO BE USED|Y
01|157312|1|3|CONFIRMATION OF PROPER FIT TO MACHINE MUST BE VERIFIED|Y
01|157314|3|1|1 Set of Pots included with Shrink Fit Machine.|Y
01|157315|3|1|Installation includes: Bulkhead cables external cables|Y
01|157315|3|2|parmeter changes service time and travel.|Y
01|157316|1|1|Reference RGA# LVR-56944|Y
01|157316|1|2|Repair of C50FHM-ER32-215IC-110TP s/n: 19902520 01|Y
01|157316|1|3|(Mimatic# 178139)|Y
01|157316|2|1|Bearings seals o-rings input spindle main housing|Y
01|157316|2|2|and ER32 spindle to be replaced.|Y
01|157328|7|1|10% discount added for 5K price break|Y
01|157330|6|1|Etch Prototype|Y
01|157337|2|1|An additional 5% discount has been applied per our|Y
01|157337|2|2|Spring Promotion.|Y
01|157341|2|1|Optional:LN can modify the blank draw tube to customer|Y
01|157341|2|2|supplied dimensions|Y
01|157341|2|3|Price is NET cost w/no additional discount|Y
01|157342|3|1|Modified by LYN. Once this tool holder is purchased|Y
01|157342|3|2|it cannot be cancelled or returned.|Y
01|157342|3|3|Final part# C5016-1500-7.00DIN-M|Y
01|157353|1|1|TABLES ARE IN STOCK; WILL TAKE 2-3 WEEKS TO SHIP TO|Y
01|157353|1|2|THE CUSTOMER.|Y
01|157353|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|157353|6|2|TO RUN FROM ROTARY TO BULKHEAD CONNECTORS|Y
01|157353|7|1|HYDRAULIC MANIFOLDS PRESSURE REGULATOR FOR|Y
01|157353|7|2|AIR/HYDRAUILC BOOSTER SETUP|Y
01|157354|1|1|TAR-57014|Y
01|157354|1|2|A21 750W CONTROLLER|Y
01|157354|1|3|SN: D0051B140720019|Y
01|157354|1|4|Customer experienced 4001 alarm and could not clear|Y
01|157354|1|5|Reset the controller and input base parameter set|Y
01|157356|1|1|for osp300 includes face plate and cables|Y
01|157356|2|1|for osp300 includes face plate and cables|Y
01|157363|3|1|This item is considered special once an order is|Y
01|157363|3|2|placed it cannot be cancelled or returned.|Y
01|157378|1|1|Discontinued product.This is last one available|Y
01|157379|4|1|66 RPM TWIN SPINDLE TABLE. EXACT SPEED WILL BE|Y
01|157379|4|2|CALCULATED ONCE THE HAAS MOTOR SPEED IS DETERMINED.|Y
01|157379|5|1|MANUAL TAILSTOCK - FOLD DOWN TYPE|Y
01|157379|6|1|PNUEMATIC TAILSTOCK|Y
01|157379|7|1|16C PNUEMATIC COLLET CLOSER (PRATT BERNARD)|Y
01|157379|8|1|EXTERNAL POWER/FEEDBACK CABLES REQUIRED TO RUN FROM|Y
01|157379|8|2|ROTARY TABLE TO BULKHEAD OF THE MACHINE.|Y
01|157379|8|3|THESE CABLES ARE INCLUDED WITH ROTARIES AT NO COST|Y
01|157385|2|1|Installation includes: Drive unit short bar fiber|Y
01|157385|2|2|optic cable communications cable bulkhead cables|Y
01|157385|2|3|external cables parmeter changes service time and|Y
01|157385|2|4|and travel.|Y
01|157391|2|1|EXTERNAL POWER/FEEDBACK CABLE FOR 4TH AXIS|Y
01|157391|2|2|INSTALLATION ON HAAS CM1|Y
01|157398|1|1|w/ Long Coupling 130.25mm|Y
01|157398|2|1|HA40L-SK20X-ICE|Y
01|157398|2|2|90-Degree Radial Live Tool SK20|Y
01|157398|2|3|Output ICE|Y
01|157398|2|4|w/ Long Coupling 130.25mm|Y
01|157404|1|1|P/N: MNZ20-ER25E-AD-ICE|Y
01|157404|1|2|Mori Live Adjustable ER25 External Nut|Y
01|157435|2|1|offered as in stock version|Y
01|157445|1|1|Replaces part #B3001-1000-1.19.Holder now has coolant|Y
01|157445|1|2|ports as the new standard|Y
01|157445|2|1|New part # but same item as the B30-4500|Y
01|157458|1|1|Replaces part #C5011-0750-4.00.This item now|Y
01|157458|1|2|manufactured with coolant ports as the standard|Y
01|157463|1|1|Need to verify Rotary location and DBC-130 table layout|Y
01|157463|1|2|for mounting. Sub plate not included if required.|Y
01|157463|1|3|Standard with Air/Hydraulic Booster.|Y
01|157463|3|1|Includes 6th axis interface with Fanuc control Fanuc|Y
01|157463|3|2|servo amplifier to match servo motor in Rotary Table|Y
01|157463|3|3|Cabling and cable management system. Cables will hang|Y
01|157463|3|4|from an extention arm mounted on top of column or the|Y
01|157463|3|5|ceiling of the machine enclosure. Complete installation|Y
01|157463|3|6|parts time and travel. Installion will be 4-5 days.|Y
01|157475|6|1|Extra 5% applied for Spring Promo discount|Y
01|157477|1|1|Installed w/ PS-N46E at factory|Y
01|157477|2|1|Installed on holder at factory|Y
01|157477|4|1|Installed w/ PS-N46E at factory|Y
01|157477|5|1|Installed on holder at factory|Y
01|157477|7|1|Installed w/ PS-N46E at factory|Y
01|157477|8|1|Installed on holder at factory|Y
01|157477|12|1|Installed w/ PS-N46E at factory|Y
01|157477|13|1|Installed on holder at factory|Y
01|157477|16|1|Installed on holder at factory|Y
01|157487|1|1|Master Jaw Set for H034M10|Y
01|157497|6|1|Extra 5% promo discount applied|Y
01|157497|6|2|Quote pricing valid until 7/15/2021|Y
01|157503|1|1|Tooling Certificate Number: 20275-2656-052120|Y
01|157532|4|1|Extra 5% applied for Spring Promo discount|Y
01|157542|9|1|Please double check the dimensions on the attached|Y
01|157542|9|2|drawing|Y
01|157542|10|1|Extra 10% applied for promo discount|Y
01|157546|3|1|LIST PRICE OVER $500 QUALIFIES FOR 5% ADDITIONAL|Y
01|157546|3|2|PROMO DISCOUNT.|Y
01|157550|1|1|VDI50 DIN5480 W24X1.25X30X18/9B;|Y
01|157550|1|2|OUTPUTHSK63;L=177mm; 60DEG FIXED ANGLE|Y
01|157550|2|1|VDI50 DIN5480 W24X1.25X30X18/9B;|Y
01|157550|2|2|OUTPUTHSK63;L=177mm; 60DEG FIXED ANGLE|Y
01|157551|8|1|INCLUDES ONE (8) HOUR DAY TO INSTALL AND TRAIN|Y
01|157551|10|1|INCLUDES TP-32 TOOL MANAGEMENT SOFTWARE WITH 8 SEATS|Y
01|157551|17|1|INCLUDES TWO (8) HOUR DAYS TO INSTALL AND TRAIN|Y
01|157568|1|1|This is a Demo unit on our showroom floor and has been|Y
01|157568|1|2|gently used so we can offer a deeper discount. We will|Y
01|157568|1|3|still honor our standard warranty. Non-returnable.|Y
01|157569|1|1|Reference RGA# LVR-56950|Y
01|157569|1|2|Repair of MNZ20-CAPTO3X-HS s/n: A0047 (Alps# T32290)|Y
01|157569|2|1|Bearings o-rings inside key parts and spindle to be|Y
01|157569|2|2|replaced.|Y
01|157575|1|1|Includes Cables from CNC260 to Machine Bulkhead|Y
01|157577|1|1|We will need to know if t slot or bolt hole face plate|Y
01|157577|1|2|3rd Party software and 4th Axis Interface required from|Y
01|157577|1|3|Haas - this quote does not include installation from|Y
01|157577|1|4|Lyndex Nikken. Install from Lyndex Nikken is $3000.00|Y
01|157577|2|1|Power & Feedback Cables from Rotary to Machine|Y
01|157577|2|2|Bulkhead|Y
01|157580|15|1|An additional 10% discount has been applied to the item|Y
01|157580|15|2|on this quotation per our Spring Promo.|Y
01|157585|1|1|CNC201 SN:1548|Y
01|157585|1|2|TAR-56988|Y
01|157613|1|1|CNC250BFA SN:3165|Y
01|157613|10|1|AXK1116|Y
01|157613|25|1|Cable Set|Y
01|157618|3|1|Please note:Spring Promo ends May 31st. I will extend|Y
01|157618|3|2|it until June 30th for this quote. Extra 10% discount|Y
01|157618|3|3|added to this quote.|Y
01|157632|1|1|Option #1 (3/4) Square Shank Tools|Y
01|157632|2|1|Option 2: 1 inch square shank tools|Y
01|157633|2|1|35mm Subplate to hit 140 Centerline|Y
01|157635|1|1|**HOT DEALS DIST Net $109 EU Net $136 While Qtys last**|Y
01|157635|1|2|** Closeout Promotion! All sales are FINAL!**|Y
01|157635|1|3|** Confirm Cust. Has Balance Mach. **|Y
01|157638|1|1|P/N: HSK80C-NX4-177|Y
01|157638|1|2|Special HSK80C taper NX4 Spindle Speeder|Y
01|157667|6|1|An additional 5% has been added to these items per our|Y
01|157667|6|2|Spring Promotion.|Y
01|157670|2|1|An additional 10% discount has been added per our|Y
01|157670|2|2|Spring Hardwork Promotion.|Y
01|157680|9|1|BMT65-ER25-AD-ICE >> BMT65 ER25 Adj- ICE Live Tool|Y
01|157680|9|2|Per Drawing 193136.|Y
01|157689|1|1|*** ONE TIME X6 PCS PRICING|Y
01|157691|2|1|Extra 5% applied to match PO 6421521|Y
01|157702|2|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|157702|2|2|of spindle drawing/machine spec confirmation|Y
01|157702|2|3|NET PRICE|Y
01|157713|9|1|INDLUDES TWO (8) HOUR DAYS OF INSTALLATION AND|Y
01|157713|9|2|TRAINING.|Y
01|157733|3|1|Routing Cabling Providing Cables Drive Units|Y
01|157733|3|2|Parameter Changes Service Time & Travel|Y
01|157737|1|1|5AXZ-350FA-RCN2 SN:3772|Y
01|157737|9|1|AX352VP123|Y
01|157737|11|1|Shim Plate A&B set 5AX350VP|Y
01|157737|15|1|51105|Y
01|157737|16|1|51105|Y
01|157737|17|1|RU19025CC0|Y
01|157742|7|1|An additional 5% discount has been applied to these|Y
01|157742|7|2|items per our Spring Promo.|Y
01|157747|1|1|1st Batch(w/ScrewOnKey)|Y
01|157747|2|1|1st Batch(w/ScrewOnKey)|Y
01|157747|3|1|1st Batch(w/ScrewOnKey)|Y
01|157747|4|1|1st Batch(w/ScrewOnKey)|Y
01|157771|1|1|Sub for the discontinued ZERO-ZET4 and its push button|Y
01|157771|1|2|which is what the customer wanted to replace|Y
01|157776|2|1|TABLE IN STOCK BUT SPECIAL MOTOR COVERS WILL TAKE|Y
01|157776|2|2|6-8 WEEKS.|Y
01|157778|1|1|5AX-2002-FA SN: 1224|Y
01|157786|7|1|10% discount added for 5K price break|Y
01|157789|1|1|5AX-201YA-M  SN:5958|Y
01|157789|1|2|RGA#TAR-56965|Y
01|157789|7|1|NIK-1555-300|Y
01|157798|1|1|CAT40 x .250dia. shrink-fit 3.35 gage|Y
01|157798|1|2|Command Part # C4Y3-0250|Y
01|157798|2|1|CAT40 x .750dia. shrink-fit 3.63 gage|Y
01|157798|2|2|Command Part# C4Y3-0750|Y
01|157798|3|1|CAT50 x .250dia. shrink-fit 3.35 gage|Y
01|157798|3|2|Command Part # C6Y3-0250|Y
01|157798|4|1|CAT50 x .750dia. shrink-fit 3.63 gage|Y
01|157798|4|2|Command Part # C6Y3-0750|Y
01|157813|1|1|Reference RGA# LVR-57023|Y
01|157813|1|2|Repair of MZMP47-ER32Z-ICE s/n: 4465 03|Y
01|157813|1|3|(Mimatic# 124864)|Y
01|157813|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|157813|2|2|1 input spindle and 1 output spindle|Y
01|157822|2|1|NET price.LN can either make the position block or the|Y
01|157822|2|2|customer can purchase a blank to make themselves|Y
01|157822|3|1|Extra 10% promo discount applied|Y
01|157829|1|1|92-100|Y
01|157839|7|1|Extra 10% discount applied per Promo.Oder placed must|Y
01|157839|7|2|be greater than $5000 or discount will drop to extra5%|Y
01|157840|2|1|TABLE IN STOCK BUT SPECIAL MOTOR COVERS WILL|Y
01|157840|2|2|TAKE 6-8 WEEKS.|Y
01|157842|2|1|TABLE IN STOCK BUT SPECIAL MOTOR COVERS WILL|Y
01|157842|2|2|TAKE 6-8 WEEKS.|Y
01|157850|1|1|HSK63A-SK13-105|Y
01|157854|1|1|Reference RGA# LVR-57013|Y
01|157854|1|2|Repair of NK103-12000 s/n: AL0028 (Alps# NK103-12002)|Y
01|157854|2|1|Bearings o-rings collet nut and spindle to be|Y
01|157854|2|2|replaced.|Y
01|157856|2|1|Non-returnable non-cancelable|Y
01|157876|1|1|*Live tools and tooling|Y
01|157882|1|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|157882|2|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|157882|3|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|157882|4|1|Quoted as NET pricing non-returnablenon-cancelable|Y
01|157884|2|1|Offerd as in stock alt.|Y
01|157889|1|1|Includes: Table two controllers external cables|Y
01|157889|1|2|M-code cables and power cables.|Y
01|157889|2|1|Includes: Table two controllers external cables|Y
01|157889|2|2|M-code cables and power cables.|Y
01|157895|6|1|T05-024(S) >>Slotted collet substitute for T05-024|Y
01|157899|1|1|EM55L-ER32X-ICE|Y
01|157919|2|1|EXTERNAL POWER CABLE SET|Y
01|157919|2|2|EXTERNAL FEEDBACK CABLE SET|Y
01|157922|1|1|Non cancelable non returnable.|Y
01|157922|1|2|e|N
01|157922|2|1|Please order Part # C4006-1000-4.00DIN-M|Y
01|157922|2|2|Noncancelable nonreturnable. Modified Standard holder|Y
01|157933|3|1|Discontinued item non returnable.|Y
01|157940|2|1|Lyndex-Nikken to make positioning block based on|Y
01|157940|2|2|receipt of spindle drawing information|Y
01|157940|2|3|*Net price|Y
01|157942|3|1|MCA40F-42|Y
01|157946|1|1|MNL12-CH32MZ|Y
01|157946|1|2|Mori Static T13130 Z-axis CH 32mm Int. Coolant <AXIAL>|Y
01|157946|1|3|Ext/Int. Coolant|Y
01|157946|2|1|LEA32-8|Y
01|157946|2|2|Oil Jetter Bite Sleeve for Boring Bar (OD:32mm ID: 8mm)|Y
01|157946|3|1|ST32-SK20-120|Y
01|157946|3|2|OD: 32mm STR EXT SK20 Slim Chuck CNC Auto Lathe|Y
01|157968|1|1|Conversion of CNC100-4W-120 SN: 9065|Y
01|157968|1|2|Convert from Sigma 5 to Sigma 1 for older Haas Machine|Y
01|157968|1|3|New Motor/Cable/Home Switch and Labor (Estimate)|Y
01|157968|1|4|Will also check/change out grease and oil inside.|Y
01|157983|1|1|CNCZ180 ROTARY TABLE WITH HAAAS MOTOR INCLUDED|Y
01|157983|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|158004|3|1|P/N: KM7/8-19|Y
01|158009|1|1|1st Batch/For stock|Y
01|158035|1|1|Reference RGA# LVR-56969|Y
01|158035|1|2|Repair of T32024 s/n: A0025 (Alps# T32024)|Y
01|158035|2|1|Bearings o-rings and drive shaft to be replaced.|Y
01|158035|4|1|Repair of T32005 s/n: A0300 (Alps# T32005)|Y
01|158035|4|2|Bearings o-rings collet nut spindle and drive shaft|Y
01|158035|4|3|to be replaced.|Y
01|158056|1|1|BMT65-ER16Z-H63|Y
01|158056|1|2|BMT65 Live tool ER16: 90Deg: Speeder 1:3|Y
01|158057|3|1|5% EXTRA DISCOUNT FROM PROMO|Y
01|158057|3|2|LIST PRICE OVER $500.00|Y
01|158064|3|1|Extra 5% Promo discount applied|Y
01|158069|1|1|5AX-201-FA-M SN:N/A|Y
01|158069|1|2|RGA#TAR-56962|Y
01|158069|21|1|Replacing BE3908E01X2|Y
01|158069|36|1|Replacing WP-13|Y
01|158069|39|1|NIK-1555-300|Y
01|158069|43|1|Direct Feedback Cable|Y
01|158081|1|1|2 Hole DIN modified in house|Y
01|158081|1|2|NET price no additional discount|Y
01|158093|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|158093|1|2|**HOT DEALS** DIST Net $121 EU Net $151**|Y
01|158093|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|158093|2|2|**HOT DEALS** DIST Net $111 EU Net $138**|Y
01|158093|4|1|** Closeout Promotion! All sales are FINAL!**|Y
01|158093|4|2|**HOT DEALS** DIST Net $139 EU Net $174**|Y
01|158109|9|1|Please Note: Pricing reflects discontinued tooling.|Y
01|158109|9|2|We have 5 tools remaining and then they are no longer|Y
01|158109|9|3|available. These are pre-balanced & balanceable.|Y
01|158111|1|1|MZMP46-ER25-AD-ICE|Y
01|158111|1|2|MIMATIC PART # 192555|Y
01|158132|2|1|not sure if you are looking for the nut or wrench|Y
01|158132|2|2|I quoted each option|Y
01|158135|43|1|10% discount break applied|Y
01|158139|1|1|1st Batch|Y
01|158143|2|1|EXP. 6/30/21|Y
01|158149|8|1|Position Block is needed for either Right Angle Head.|Y
01|158150|1|1|Replacement Option for ER32|Y
01|158150|2|1|HSK100A-SK25-120 HSK100A SK25 Slim Chuck Coolant|Y
01|158150|2|2|Max RPM 15000 >> Replacement Option for ER32|Y
01|158150|4|1|Replacement Option for ER25|Y
01|158150|5|1|Replacement Option for ER25|Y
01|158150|7|1|Replacement Option for ER16 and ER11|Y
01|158150|8|1|Replacement Option for ER16 and ER11|Y
01|158153|2|1|IT40-C32-105|Y
01|158153|3|1|IT50-C32-95|Y
01|158155|2|1|Offering both GL options. His cust did not specify|Y
01|158163|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS TABLE|Y
01|158168|1|1|CNCZ180 SN:20261T RGA TAR-57052|Y
01|158176|1|1|BT30-FMA31.75-45|Y
01|158176|1|2|BT30 FMA31.75 arbor|Y
01|158176|1|3|Quated as net pricing|Y
01|158176|1|4|Not cancellable and not returnable|Y
01|158189|1|1|5AX-201YA-M SN:6364|Y
01|158189|1|2|TAR-56991|Y
01|158193|3|1|Heidenhain Scale + Feedback Cable from Cover|Y
01|158193|3|2|Scale Mounting Kit + Assembly|Y
01|158193|3|3|Scale/Control Model TBD|Y
01|158212|1|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|158247|13|1|Extra 10% Spring Promo discount applied|Y
01|158248|2|1|Replaces FK-8|Y
01|158251|2|1|S32-UMTB Straight Shank Universal Touch Probe|Y
01|158251|2|2|6mm Ball / 31mm OD|Y
01|158251|2|3|Please Note: This item is non standard stock. Once a|Y
01|158251|2|4|purchase order is placed it cannot be cancelled or|Y
01|158251|2|5|returned.|Y
01|158252|1|1|Special table for HPPG without motor|Y
01|158252|1|2|Ref S#6541|Y
01|158252|2|1|TCD-79029/0|Y
01|158252|2|2|10+1 Rotary joint|Y
01|158259|1|1|NBT30-SF12-65|Y
01|158259|3|1|NBT30-SF16-65|Y
01|158259|5|1|C4-SF10-35|Y
01|158259|5|2|MOQ is 10pcs|Y
01|158259|6|1|C4-SF10-35|Y
01|158259|6|2|Price for 1pc|Y
01|158262|1|1|INCLUDES:|Y
01|158262|1|2|EXTERNAL POWER CABLE SET|Y
01|158262|1|3|EXTERNAL FEED BACK CABLE SET|Y
01|158262|1|4|INSTALLATION|Y
01|158262|1|5|LARGER SERVO AMP|Y
01|158262|2|1|CREDIT FOR CNC180FA-M AND DRIVE UNIT|Y
01|158262|3|1|CREDIT FOR GLOCK FIXTURE ENGNEERING TIME.|Y
01|158270|1|1|NO COOLANT THRU ON THIS MODEL|Y
01|158270|2|1|3 PIECE POSITIONING BLOCK (DESIGN & MANUFACTURE)|Y
01|158276|4|1|ENDS 6/30/21|Y
01|158289|1|1|Holder Installed with RFID Chip BIS-C-122-04/L.|Y
01|158289|1|2|Etching Required: CS-027-090-005 on holders and|Y
01|158289|1|3|packaging.|Y
01|158289|2|1|Etching Required: CS-027-090-005 on holders and|Y
01|158289|2|2|packaging.|Y
01|158309|1|1|CAT40U-AF1-30-OH CAT40 Main Body|Y
01|158309|1|2|Hole Diam. 1.0 Facing Diam. 1.591|Y
01|158309|1|3|Facing Depth 0.1 Wall Thickness 1.5 Space 2.5|Y
01|158309|2|1|BF130-25.4-40.41-40C >> Arbor|Y
01|158309|3|1|9BF130-25.4-40.41-40C-I  >> Byte|Y
01|158309|3|2|Minimum Quanity:3-pcs|Y
01|158309|4|1|AFC-9 >> Insert: Minimum Order 10-pcs|Y
01|158309|7|1|CAT40U-AF1-50-OH >> Main Body / Hole Dia. 1.75 X|Y
01|158309|7|2|Face Dia. 2.78 X Face Depth 0.348|Y
01|158309|7|3|Wall Thickness 1.03 Space Dimension 4.825|Y
01|158309|8|1|BF150-44.45-70.61-30C >> Arbor|Y
01|158309|9|1|9BF150-44.45-70.61-30C-I >> Byte  Minimum Quanity:3|Y
01|158309|10|1|AFC-20  Insert|Y
01|158311|6|1|Extra 10% Spring Promo discount applied|Y
01|158337|1|1|HSK100A-FMH22-47-200 Refer to drawing.|Y
01|158337|1|2|Priced at NET price. Lead approx 2 weeks ARO|Y
01|158337|1|3|Special item will not be cancelable nor returnable|Y
01|158337|1|4|once ordered|Y
01|158338|2|1|Scale + Scale Mount Kit + Cables to Motor Cover|Y
01|158341|1|1|P/N: TBD|Y
01|158341|1|2|CAT50 AH; Pins Support/Direct Mounted; CAT40 Output|Y
01|158341|1|3|L = 12 gage length; 1:1 Gear Max 5000RPM; Max 150Nm;|Y
01|158341|1|4|Internal Coolant throught the Spindle; External Coolant|Y
01|158341|1|5|through Pipes; 1015PSI|Y
01|158341|1|6|Part number will change upon order.|Y
01|158351|1|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|158372|5|1|Extra 5% Spring Promo applied|Y
01|158387|2|1|NOT AVAILABLE IN DIN|Y
01|158387|5|1|C5006-16-3.00DIN-M|Y
01|158387|5|2|Remaining 11 Pieces 3-4 weeks ARO|Y
01|158387|7|1|C5006-25-4.00DIN-M|Y
01|158390|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS;|Y
01|158390|6|2|INSTALLED BETWEEN BULKHEAD AND ROTARY CONNECTORS|Y
01|158390|7|1|HYDRAULIC MANIFOLD & PRESDDURE REGULATOR FOR 5C|Y
01|158390|7|2|CLOSER AIR/HYDRAULIC BOOSTER PUMP ASSEMBLY|Y
01|158390|13|1|TOOLING CERTIFICATE AT NO COST TO END USER|Y
01|158397|6|1|Black Oxided Sub Plate for Tailstocks|Y
01|158404|4|1|Extra 10% Spring promo discount|Y
01|158404|4|2|Pricing valid thru 7/8/21|Y
01|158421|3|1|Extra 5% promo discount applied|Y
01|158421|3|2|Pricing valid through 7/8/21|Y
01|158457|1|1|Replaces Item #B3017-0016-4.00|Y
01|158457|6|1|Replaces part #B3017-0032-5.00|Y
01|158457|8|1|Replaces part #B3017-1000-3.94|Y
01|158457|9|1|Replaces part #B3017-0020-4.00|Y
01|158466|1|1|Includes 4th&5th axis cables to bulkhead|Y
01|158475|1|1|Updated/Replacement Part# for W1005-0875-6.3C|Y
01|158475|2|1|Updated/Replacement Part# for W1505-1375-9.26C|Y
01|158483|1|1|1st Batch|Y
01|158483|2|1|1st Batch|Y
01|158483|3|1|Req INS/Install E20-NUT & ER20-SCREW(C)|Y
01|158483|4|1|Req INS/Install E25-NUT & ER25-SCREW(C)|Y
01|158483|5|1|1st Batch|Y
01|158483|6|1|1st Batch|Y
01|158483|7|1|1st Batch|Y
01|158483|8|1|1st Batch|Y
01|158483|9|1|1st Batch|Y
01|158483|10|1|1st Batch|Y
01|158483|11|1|1st Batch|Y
01|158483|12|1|1st Batch|Y
01|158483|13|1|1st Batch|Y
01|158483|14|1|1st Batch|Y
01|158484|1|1|HAIMER# A10.022.16|Y
01|158484|2|1|HAIMER# A10.142.5/16Z.4|Y
01|158484|3|1|HAIMER# A10.146.3/8Z.4|Y
01|158484|4|1|HAIMER# A10.146.1/4Z.4|Y
01|158484|7|1|HAIMER# A10.146.10 >>We do not offer 200mm Gage Length|Y
01|158484|8|1|HAIMER# A10.142.10|Y
01|158484|10|1|HAIMER# A10.146.16|Y
01|158484|10|2|We do have H100A-SF16-160MT >> Mold Type in stock.|Y
01|158484|10|3|$895.00 list price less 35%|Y
01|158484|11|1|HAIMER# A10.020.32|Y
01|158484|12|1|HAIMER# A10.022.32|Y
01|158484|14|1|HAIMER# A10.142.20|Y
01|158484|18|1|Only available in coolant thru.|Y
01|158486|1|1|Updated/Replacement Part# for W1005-0875-6.3C|Y
01|158486|2|1|Updated/Replacement Part# for W1505-1375-9.26C|Y
01|158488|6|1|**10% additional discount has been applied for|Y
01|158488|6|2|order over $5000.00 List**|Y
01|158500|18|1|Promo ends 6/30/21 applies to total quoted|Y
01|158507|1|1|Reference RGA# LVR-57047|Y
01|158507|1|2|Repair of NK103-12000 s/n: AL0035 (Alps# NK103-12002)|Y
01|158507|2|1|Bearings o-rings collet nut and spindle to be|Y
01|158507|2|2|replaced.|Y
01|158520|1|1|Part# C50RAM-ER40-215IC-110TP|Y
01|158520|1|2|CAT50 ER40 Right Angle Head 110mm Pitch TP Pin|Y
01|158520|1|3|Internal IntC|Y
01|158520|1|4|ref. drawing# A185675|Y
01|158520|2|1|Lyndex-Nikken to make for Mazak Integrex e1250V|Y
01|158520|2|2|Net Price|Y
01|158539|1|1|for HW-06-HS (H037M6)|Y
01|158542|2|1|EXTERNAL POWER CABLE SET|Y
01|158542|2|2|EXTERNAL FEED BACK CABLE SET|Y
01|158568|3|1|LIST PRICE TOTAL IS OVER $500 SO THIS ORDER WILL|Y
01|158568|3|2|QUALIFY FOR THE ADDITIONAL 5% DISCOUNT.|Y
01|158577|1|1|TAR-56844 for rotary table CNC260LFA|Y
01|158577|1|2|Table is not repairable due to casting damage|Y
01|158577|1|3|Inspection fee for evaluation is below.|Y
01|158588|1|1|1st Batch(w/ScrewOnKey)|Y
01|158595|1|1|1st Batch|Y
01|158595|2|1|1st Batch|Y
01|158595|3|1|1st Batch|Y
01|158595|4|1|1st Batch|Y
01|158595|5|1|1st Batch|Y
01|158597|1|1|1st Batch|Y
01|158600|5|1|An additional 5% discount has been applied per our|Y
01|158600|5|2|Spring Promo. Promo expires 6/30/21.|Y
01|158617|4|1|CAT40-ER25-2.76BN|Y
01|158619|1|1|Final part number C40S6-1250-2.00-IDI|Y
01|158645|6|1|Extra 10% promo discount applied|Y
01|158654|4|1|OKV1-ER40Z|Y
01|158654|4|2|Okuma Live ER40 Z-Axis STRT<Face>BMT Offset ExtCoolant|Y
01|158654|5|1|OKV1-ER40X|Y
01|158654|5|2|Okuma Live ER40 X-Axis 90Deg<Side>BMT ExtCoolant 3K|Y
01|158658|17|1|5% Discount added for $500 price break|Y
01|158671|1|1|Tooling Certificate Number: 20275-2835-010421RT|Y
01|158719|1|1|Repair RGA#TOR-56889|Y
01|158719|1|2|Repair of N5005-1375-6.77|Y
01|158724|1|1|HSK50E-MMC8C-127-AA|Y
01|158724|1|2|HSK50E 10mm Mini-Mini Chuck Coolant|Y
01|158724|1|3|Advanced Alpha *new generation|Y
01|158734|4|1|Lyndex-Nikken to make position block upon confirmation|Y
01|158734|4|2|of spindle drawing|Y
01|158736|5|1|This item is considered special once ordered cannot|Y
01|158736|5|2|be cancelled or returned.|Y
01|158741|1|1|C4006-1250-2.00DIN-M|Y
01|158741|1|2|CAT40 1.1/4 End Mill Holder with Form B DIN|Y
01|158742|1|1|NBT30-SF12-65|Y
01|158742|3|1|NBT30-SF16-65|Y
01|158742|6|1|C4-SF10-35|Y
01|158742|6|2|Price for 1pc|Y
01|158742|12|1|PSB-1T|Y
01|158742|13|1|NT-26 >> As I checked NT's catalog there is PSB-26|Y
01|158742|13|2|PSB-26 is LN# PS-130E|Y
01|158742|14|1|0-CH >> As I checked NT's catalog there is PSB-0-CH|Y
01|158742|14|2|LN# PS-114 is simmilar but the top of the oil hole|Y
01|158742|14|3|is different|Y
01|158755|17|1|NOT SEALED|Y
01|158766|1|1|Tool Certificate Number:13687-2892-030821|Y
01|158766|1|2|Tool Certificate Number:13687-2893-030821|Y
01|158771|1|1|1st Batch|Y
01|158771|2|1|1st Batch|Y
01|158776|4|1|Lyndex-Nikken to make position block upon confirmation|Y
01|158776|4|2|of spindle drawing|Y
01|158803|8|1|Added as option|Y
01|158803|15|1|Extra 5% Promo discount applied|Y
01|158814|4|1|Min. Order Qty.: 2|Y
01|158814|9|1|Min. Order Qty.: 2|Y
01|158834|2|1|Lyndex-Nikken to make positioning block based on|Y
01|158834|2|2|receipt of spindle drawing information|Y
01|158834|2|3|Quoted as NET pricing|Y
01|158835|1|1|Reference RGA# TOR-57018|Y
01|158835|1|2|Repair of CAT50-C1.1/4-105U|Y
01|158835|6|1|Repair of C50UMC-1250|Y
01|158847|1|1|Please Note: This item is discontinued once quantities|Y
01|158847|1|2|are depleted it will have to be quoted as a special|Y
01|158847|1|3|with 10-pc minimum.|Y
01|158847|2|1|16-pcs stock|Y
01|158847|3|1|7-pcs stock / Bal 10 Weeks|Y
01|158847|4|1|5 Stock / Bal 20-Pcs due 1 week/ 13-pcs 08/15|Y
01|158847|5|1|7-pcs stock|Y
01|158847|6|1|6-pcs stock / 20-pcs due 06-22|Y
01|158847|7|1|No Stock|Y
01|158847|8|1|Please Note: This holder is not included in the|Y
01|158847|8|2|Spring Promo. 20-pcs in stock.|Y
01|158854|5|1|Extra 10% promo discount applied. Order placed must|Y
01|158854|5|2|exceed 5K list total to qualify.Contact us for revised|Y
01|158854|5|3|quote for any changed. Quote valid through 7/15/2021|Y
01|158860|5|1|Northfield 16C collet closer with adapter and rotary|Y
01|158860|5|2|union.|Y
01|158875|1|1|part# TBD*|Y
01|158875|1|2|(temp part# 140066)|Y
01|158875|1|3|POLYGON C8 AGH; ER40 OUTPUT|Y
01|158875|1|4|MIMATIC TORQUE ARM ADAPT TO MACHINE CENTER|Y
01|158875|1|5|3PIN SUPPORT;|Y
01|158875|1|6|L=225mm;|Y
01|158875|1|7|1/1 GEAR; 150Nm; 5000RPM;|Y
01|158875|1|8|REF DRWG # 00046223 (concept only)|Y
01|158891|1|1|SN: 100481|Y
01|158891|1|2|Display Presetter at Makerspace Hartford CT|Y
01|158891|1|3|PO Must be sent directly to justinh@lyndexnikken.com|Y
01|158905|1|1|DIA=1.265 L=.687 M22xP1.5 WRENCH 016-SPAN|Y
01|158905|2|1|In stock option. DIA=1.098 L=.675 Wrench=25mm open end|Y
01|158916|1|1|Includes Cables - Installation to be done by Morris|Y
01|158921|4|1|Quoted as an in stock option|Y
01|158926|1|1|Ref# H037M10 >> Includes: Std. Soft Jaws with bolts|Y
01|158926|1|2|hex wrench .  **Draw nut is blank|Y
01|158947|1|1|Option 1|Y
01|158947|2|1|Option 2|Y
01|158952|1|1|Part # CNC260BZA-M|Y
01|158952|1|2|Replacement Table for CNC250BZA SN: 3137|Y
01|158952|2|1|Replacement Cable Set - Need to confirm length and|Y
01|158952|2|2|Wiring of existing table|Y
01|158963|4|1|**DEMO UNIT - for LOANER PURPOSES**|Y
01|158963|4|2|**Owned by Lyndex-Nikken|Y
01|158964|1|1|Reference RGA# TOR-57083|Y
01|158964|1|2|Repair of CAT40-C1-85U-IDU|Y
01|158979|1|1|Reference RGA# CUR-57051|Y
01|158979|1|2|Repair of PRE-HTR6-I50 s/n: 5524|Y
01|158979|3|1|Calibration service for camera system spindle runout|Y
01|158979|3|2|spindle orthagonality and column/base perpindicularity|Y
01|158979|3|3|included.|Y
01|158987|1|1|The above item is not standard stock and therefore|Y
01|158987|1|2|considered a Special. Once a PO is placed with factory|Y
01|158987|1|3|it may not be canceled or returned.|Y
01|158992|4|1|5% discount added for $500 price break|Y
01|158992|4|2|Promo Pricing valid through 06/30/2021|Y
01|159014|1|1|ETA 3-5 days from specs received|Y
01|159020|4|1|TAT-105 SN: 3367|Y
01|159029|1|1|Reference RGA# QUA-57059|Y
01|159029|1|2|Repair of MZMP5-CT40Z-ICE s/n: 18901135 02|Y
01|159029|1|3|(Mimatic# 174863)|Y
01|159029|2|1|Bearings seals o-rings housing & spindle threadring|Y
01|159029|2|2|to be replaced. Recondition 1 x input spindle and 1 x|Y
01|159029|2|3|output spindle.|Y
01|159033|2|1|STH50-SK16-120  50mm SK16 Slim Chuck Straight Shank|Y
01|159033|8|1|STH50-SK20-125  50mm SK20 Slim Chuck Straight Shank|Y
01|159033|8|2|Special Order Item.|Y
01|159034|2|1|QUOTE GOOD FOR 30 DAYS. AFTER 30 DAYS THIS WILL NEED|Y
01|159034|2|2|TO BE RE-QUOTED. THE PROMO DISCOUNT ENDS ON 6/30.|Y
01|159041|2|1|Mechanical seal for C1SB115 M-4774|Y
01|159041|2|2|Part# - TBD|Y
01|159044|1|1|For B3006-0500-2.50B|Y
01|159044|2|1|For B3006-0375-2.36|Y
01|159044|3|1|For B3006-0187-2.36|Y
01|159045|10|1|PROMO ENDS 6/30|Y
01|159047|11|1|PROMO GOOD THRU 6/30|Y
01|159049|1|1|Req INS/Cosmetic Evaluation|Y
01|159063|16|1|PROMO GOOD THRU 6/30/21|Y
01|159065|16|1|PROMO GOOD THRU 6/30/21|Y
01|159101|1|1|Tooling Certificate Number: 13687-2741-090420|Y
01|159117|1|1|Chip Hole Installed in customers material.|Y
01|159117|1|2|Please contact Lyndex-Nikken for RGA before sending|Y
01|159117|1|3|tooling.|Y
01|159123|1|1|BT30-FMS25.4-45 as noted by customer|Y
01|159124|1|1|MIMATIC#166608 - MZQT47-ER16X-OFF-HS4|Y
01|159124|1|2|MAZAK LIVE; ER16; HIGHSPEED;STRAIGHT OFFSET;|Y
01|159124|1|3|V=60mm; 1:4 GEAR; MAX 10Nm; MAX INPUT 3400 RPM;|Y
01|159124|1|4|MAX OUTPUT 13600 RPM; EXTERNAL COOLANT|Y
01|159124|1|5|REF DRWG# 00029392|Y
01|159124|3|1|MIMATIC#166608 - MZQT47-ER16X-OFF-HS4|Y
01|159124|3|2|MAZAK LIVE; ER16; HIGHSPEED;STRAIGHT OFFSET;|Y
01|159124|3|3|V=60mm; 1:4 GEAR; MAX 10Nm; MAX INPUT 3400 RPM;|Y
01|159124|3|4|MAX OUTPUT 13600 RPM; EXTERNAL COOLANT|Y
01|159124|3|5|REF DRWG# 00029392|Y
01|159125|1|1|BT30-FMS25.4-45 as noted by customer|Y
01|159129|8|1|PROMO ENDS 6/30/21|Y
01|159130|1|1|Tooling Certificate Number: 25000-2987-060921|Y
01|159133|1|1|PART NUMBER INCLUDES HAAS MOTOR|Y
01|159133|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|159140|16|1|9pc avail at factory|Y
01|159140|17|1|10 pcs avail at factory|Y
01|159140|18|1|9pcs avail at factory|Y
01|159140|19|1|11pcs avail at the factory|Y
01|159140|20|1|9pcs avail at the factory|Y
01|159140|22|1|8pcs avail at the factory|Y
01|159166|1|1|Reference RGA# TOR-57057|Y
01|159166|1|2|Repair of 1 x PF-2|Y
01|159166|5|1|Calibration service included.|Y
01|159208|2|1|HSK63C-SF20-65|Y
01|159208|2|2|HSK63C 20mm Shrink Fit Holder|Y
01|159208|2|3|Min. Order Qty.: 1-4|Y
01|159208|3|1|HSK63C-SF20-65|Y
01|159208|3|2|HSK63C 20mm Shrink Fit Holder|Y
01|159208|3|3|Min. Order Qty.: 5+|Y
01|159208|4|1|HSK63C-HC20-80|Y
01|159208|4|2|HSK63C 20mm Hyd. Chuck Holder|Y
01|159209|1|1|Fanuc Motor is Included. Center Height: 550mm|Y
01|159209|1|2|Fanuc Motor Delivery : 6weeks|Y
01|159209|2|1|Raiser price is included.|Y
01|159209|9|1|Sub Plates(2pcs)  Size per piece: 1000mm x 2000mm|Y
01|159209|9|2|Thick: 2.75 Material: ASTM A36 HRS|Y
01|159209|9|3|Weight: 4400lbs (Each) Grind: Full surface grinding|Y
01|159209|9|4|Special Order Item.|Y
01|159210|1|1|CNC180LFA  s/n 1716N|Y
01|159210|1|2|Special plate. Including the modification fee.|Y
01|159210|1|3|w/o Motor|Y
01|159210|3|1|TCE-A3016|Y
01|159210|3|2|Power Cable|Y
01|159240|2|1|Included with the Shrink Fit Machine.|Y
01|159244|1|1|HSK63A ; 45DEG FIXED AGH; ER25 OUTPUT;A=65mm; L=202mm;|Y
01|159244|1|2|1/1 GEAR; 30Nm; 10000RPM;REVERSAL OF ROTATION DIRECION;|Y
01|159244|1|3|REF DRWG# 00053434|Y
01|159244|1|4|1 PC PRICING|Y
01|159244|1|5|Quoted as NET pricing non-returnable non-cancelabe|Y
01|159244|1|6|includes wrenches WRENCH-MIM-112913WRENCH-MIM-107446|Y
01|159244|2|1|2 PC PRICING|Y
01|159244|2|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|159244|2|3|includes wrenches WRENCH-MIM-112913WRENCH-MIM-107446|Y
01|159255|1|1|H125A-SM1500-6.00|Y
01|159255|1|2|HSK125A 1.1/2 pilot 6GL|Y
01|159255|1|3|NO UNV|Y
01|159266|4|1|Installation to be done in Mexico|Y
01|159277|1|1|Replacement Items of connectors per DWG TCE-96982|Y
01|159277|1|2|*** Items on DWG are Saneki Brand will be Harding ***|Y
01|159277|1|3|YSHTF10B YS1F6ME YSCFE05 YSCFE15 YSAIM3 YSF4|Y
01|159277|1|4|YSFD10B|Y
01|159277|2|1|Below items according to DWG TCE-A3304|Y
01|159277|2|2|YSDT10B-25T YSIM6E/YSCME05 YSIM6ME/YSCME15|Y
01|159277|2|3|YSAIM3/YSM4 YSFH10B|Y
01|159287|1|1|Reference RGA# LVR-57111|Y
01|159287|1|2|Repair of NK103-12000 s/n: AL0020 (Alps# NK103-12002)|Y
01|159287|2|1|Bearings o-rings collet nut and spindle to be|Y
01|159287|2|2|replaced. If the spindle can be reused the repair fee|Y
01|159287|2|3|will be $1543.11|Y
01|159297|4|1|1000psi tank with pressure reducing valves for Nikken|Y
01|159297|4|2|brake system. Pump will have two hand levers for|Y
01|159297|4|3|Schunk vises. Vises to be provided by BEM.Vise mounted|Y
01|159297|4|4|to Haas machine table is BEM responsibility vise|Y
01|159297|4|5|mounted to Nikken will be done by Lyndex-Nikken.|Y
01|159297|7|1|Pressure reducing valve for hydraulic unit|Y
01|159299|5|1|Cable set separate & not included|Y
01|159301|1|1|The 1 is in stock if need to switch later on|Y
01|159301|11|1|Replaces SKN-10BJ|Y
01|159301|21|1|Replaces SKN-6BJ|Y
01|159301|24|1|Extra 5% promo discount applied|Y
01|159301|24|2|Quote price valid for 30 days|Y
01|159308|1|1|In stock substitute for 3/4|Y
01|159308|6|1|In stock option for CAT40-SK16-90U-IDU|Y
01|159308|8|1|In stock option for CAT40-SK16-90U-IDU|Y
01|159319|7|1|Please Note: 10% extra was added to the discount on|Y
01|159319|7|2|this quote Spring Promo. If quantities change please|Y
01|159319|7|3|re-submit your quotation. Quote is good for 30 days.|Y
01|159329|1|1|Tooling Certificate Number:13485-2939-041621|Y
01|159342|3|1|Substitue to discontinued HSK63A-KEY|Y
01|159345|1|1|We are extending the HardWork discount to allow DRT|N
01|159345|1|2|to come to Mundelein and see a demo unit.|N
01|159348|4|1|5% discount added for $500 price break|Y
01|159353|2|1|Installation includes: drive unit short bar fiber|Y
01|159353|2|2|optic cables communication cables bulk head cable|Y
01|159353|2|3|set external cable set parameter changes service|Y
01|159353|2|4|time and travel.|Y
01|159353|2|5|(If existing equipment can be salvaged from previous|Y
01|159353|2|6|DuraCenter installation credit can be issued in the|Y
01|159353|2|7|form of tooling.)|Y
01|159354|2|1|Extra 5% promo discount applied|Y
01|159354|2|2|Quoted price valid for 30 days|Y
01|159360|1|1|Reference RGA# TOR-57115|Y
01|159360|1|2|Repair of 1 x PF-2|Y
01|159360|5|1|Calibration service included|Y
01|159372|13|1|An additional 10% Discount has been added to this quote|Y
01|159372|13|2|per our Spring Promo!|Y
01|159390|1|1|OKL3-SK20X-ICE-G|Y
01|159390|1|2|Okuma Live X-Axis 90Deg SK20 IntC 7MP 6000rpm DIN SIDE|Y
01|159390|1|3|with High Speed Nut [SKN-20B(GH)]|Y
01|159396|3|1|Alternative for C4007-0040-3.13|Y
01|159399|1|1|HSK50A-HC20-120|Y
01|159399|1|2|Quoted AS NET pricing non-returnable non-cancelable|Y
01|159400|1|1|MMC8/VMC8 Collet 2.6mm Mechanically Sealed|Y
01|159400|1|2|Priced at NET price no additional discount applied|Y
01|159400|1|3|This item is a non-standard stock item and considered|Y
01|159400|1|4|a Special.This item will not be cancelable nor|Y
01|159400|1|5|returnable once a PO is issued to the factory|Y
01|159400|2|1|All info noted for line 1 applies|Y
01|159400|2|2|Price for 10-19 pcs|Y
01|159400|3|1|All info noted for line 1 applies|Y
01|159400|3|2|Price for 20-29 pcs|Y
01|159400|4|1|All info noted for line 1 applies|Y
01|159400|4|2|Price for 30-39 pcs|Y
01|159400|5|1|All info noted for line 1 applies|Y
01|159400|5|2|Price for 40-49 pcs|Y
01|159400|6|1|All info noted for line 1 applies|Y
01|159400|6|2|Price for 50+ pcs|Y
01|159406|6|1|Promo discount ends 6/30.|Y
01|159411|1|1|REPAIR FOR A21-1800W CTRL FOR CNCB450 Rotary Table|Y
01|159411|1|2|4001 Alarm Present - Reset Ram clear and alarm not|Y
01|159411|1|3|present anymore|Y
01|159411|3|1|Estimate Freight Charge UPS NDA|Y
01|159432|4|1|ADDITIONAL 10% PROMO DISCOUNT; LIST PRICE ABOVE $5K|Y
01|159437|1|1|ref# H037M10|Y
01|159437|1|2|Includes: Std. Soft Jaws with bolts hex wrench|Y
01|159437|1|3|**draw nut is blank|Y
01|159444|16|1|5% discount added for $500 price break|Y
01|159446|3|1|LQ3-10|Y
01|159446|3|2|Center Drill (Dia. 3mm) for S.LM5-H|Y
01|159456|7|1|Promo ends 6/30/21|Y
01|159460|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|159473|1|1|Reference RGA# TOR-57091|Y
01|159473|1|2|Repair of 1 x HSK100A-UMC0750-115|Y
01|159478|1|1|260mm RT w/ Haas Motor & Cable Set|Y
01|159478|2|1|Includes Table Mounting Parameter Changes Air Lines &|Y
01|159478|2|2|Service Time & Travel|Y
01|159483|2|1|Lyndex-Nikken to make upon receipt of questionnaire|Y
01|159483|2|2|*net price|Y
01|159492|3|1|Adapter Plate CNC260 to ATL208-B60|Y
01|159492|4|1|Custom Collet for 2.170 Diameter|Y
01|159499|29|1|An additional 10% discount has been applied per our|Y
01|159499|29|2|Spring Promo. **Promo Expires June 30th 2021.|Y
01|159504|9|1|We do not offer a coolant sealed version|Y
01|159507|2|1|Once a standard holder is scheduled for modification|Y
01|159507|2|2|the order cannot be cancelled or returned.|Y
01|159508|3|1|Promo ends 6/30|Y
01|159508|3|2|Discount applies to total quantity quoted.|Y
01|159513|1|1|S.MHA50-A8N|Y
01|159513|1|2|Non cancellable Non returnable|Y
01|159513|2|1|Y32-10|Y
01|159513|2|2|Non cancellable Non returnable|Y
01|159513|3|1|FT45-5|Y
01|159513|3|2|Non cancellable Non returnable|Y
01|159513|4|1|Non cancellable Non returnable|Y
01|159513|5|1|Non cancellable Non returnable|Y
01|159513|6|1|HMS-9.0|Y
01|159513|6|2|Reamer|Y
01|159513|6|3|Non cancellable Non returnable|Y
01|159518|6|1|PLEASE NOTE THESE ITEMS ARE NON-STOCK STANDARDS|Y
01|159518|6|2|AND MAY NOT BE RETURNED.|Y
01|159519|1|1|S.HSK50A-SYJ16-12.5|Y
01|159519|1|2|HSK50A ATC alignment kit|Y
01|159519|1|3|Please refer the drawing attached|Y
01|159528|2|1|HSK63F-SK16-105P|Y
01|159528|2|2|HSK63F SK16 Slim Chuck High Speed|Y
01|159528|4|1|HSK63F-SK13-70P|Y
01|159528|4|2|HSK63F SK13 Slim Chuck High Speed  Max RPM 30K|Y
01|159528|5|1|HSK63F-SK13-105P|Y
01|159528|5|2|HSK63F SK13 Slim Chuck High Speed  Max RPM 30K|Y
01|159528|6|1|HSK63F-SK13C-120P|Y
01|159528|6|2|HSK63F SK13 Slim Chuck High Speed  Max RPM 30K|Y
01|159571|4|1|5% discount added for $500 Price break|Y
01|159582|2|1|Lyndex-Nikken to make positioning block based on|Y
01|159582|2|2|receipt of spindle drawing information|Y
01|159582|2|3|Quoted as NET pricing|Y
01|159587|2|1|Price on table includes Power and Feedback cables|Y
01|159587|2|2|from Rotary to machine bulkhead|Y
01|159591|4|1|Buy 2 get 1 free.|Y
01|159594|1|1|2ea currently in stock. Next due date is 7/5 week|Y
01|159624|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS|Y
01|159624|2|2|INCLUDED INTO COST OF ROTARY TABLE.|Y
01|159630|2|1|Replaces item # CAT50-SK10-105U. Same item.New version|Y
01|159630|2|2|comes with RFID chip hole as a standard|Y
01|159648|2|1|Quoted at Net Price|Y
01|159667|1|1|Final Part Number: H100A-SF0625-3.94CP-IDI|Y
01|159667|2|1|Final Part Number: H100A-SF0750-6.30CP-IDI|Y
01|159667|3|1|Final Part Number: H100A-SF1000-6.30CP-IDI|Y
01|159667|5|1|Final Part Number: HSK100A-ER16-6.00-IDI|Y
01|159687|2|1|Price on tbale includes Power and Feedback cables|Y
01|159687|2|2|from Rotary to machine bulkhead|Y
01|159697|4|1|Extra 5% promo discount applied|Y
01|159709|1|1|New alternative for: MZMP46-ER32Z-C|Y
01|159709|1|2|Can run dry internal coolant or external coolant|Y
01|159709|3|1|ref. old part# 05.0611.7142.505|Y
01|159715|1|1|BT50-SK13-105|Y
01|159715|1|2|BT50 SK13 Slim Chuck|Y
01|159715|3|1|BT50-SK13-105P|Y
01|159715|3|2|BT50 SK13 Slim Chuck High Speed|Y
01|159716|1|1|Replaces ER8-EXT-625has new mini nutnon crown style|Y
01|159718|1|1|Delivery 1-pc pending|Y
01|159724|1|1|Tooling Certificate Number:8115-2827-121820|Y
01|159735|1|1|Reference RGA# LVR-57078|Y
01|159735|1|2|Repair of MZQT5-CT40X-OFF-ICE s/n: 82925 02|Y
01|159735|1|3|(Mimatic# 103663)|Y
01|159735|2|1|Bearings seals and o-rings to be replaced.|Y
01|159735|2|2|Recondition 1 output spindle|Y
01|159744|9|1|Shank Dia: 5-10mm|Y
01|159744|11|1|Shank Dia: 10mm-|Y
01|159759|1|1|1st Batch|N
01|159816|1|1|Tooling Certificate Number: E8165-2557-020320|Y
01|159824|1|1|HSK100A-SK20C-250 >> HSK100A SK20 Slim Chuck Coolant|Y
01|159824|1|2|250mm Gage Length|Y
01|159824|2|1|HSK100A-SK20C-300 >> >> HSK100A SK20 Slim Chuck Coolant|Y
01|159824|2|2|300mm Gage Length|Y
01|159854|3|1|EXTERNAL POWER CABLE SET|Y
01|159854|3|2|EXTERNAL FEEDBACK CABLE SET|Y
01|159860|2|1|This is a Like New One. Special Discount applied.|Y
01|159860|2|2|Only One unit in Stock. Ends as soon as sold out.|Y
01|159873|4|1|4 Port Rotary Union / SAE Fittings and Caps / Mounting|Y
01|159873|4|2|Anti-Rotate Bracket / Sheet Metal Fillers x 2|Y
01|159873|5|1|1000psi pump with 4-solenoid and pressure switches.|Y
01|159878|1|1|With MT3 piston|Y
01|159917|1|1|ANGLE HEAD TYPE SW SIZE 7 FOR DOOSAN VTR|Y
01|159917|1|2|TECHNICAL SPECIFICATIONS:|Y
01|159917|1|3|SHAFT MAS-BT 50 ACCORDING JIS6339|Y
01|159917|1|4|WITH SUPPORT BUILT FOR DOOSAN VTR CURVIC COUPLING|Y
01|159917|1|5|TOOLING INTERFACE FOR ER32 COLLET SYSTEM|Y
01|159917|1|6|REVERSAL OF INPUT DIRECTION FOR ROTATION|Y
01|159917|1|7|L = 180MM; L1 = 70MM; GEAR RATIO 1:1; 70NM MAX TORQUE|Y
01|159917|1|8|MAX INGOING/OUTGOING REVOLUTION - 6500 RPM|Y
01|159917|1|9|WEIGHT APPROXIMATELY 15KG; 112900 CLAMPING WRENCH;|Y
01|159917|1|10|107642 HOOKWRENCH FOR CLAMPING NUT|Y
01|159940|32|1|for NT05/SE1 tap collets|Y
01|159943|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|159943|4|1|** Closeout Promotion! All sales are FINAL!**|Y
01|159944|1|1|Tooling Certificate Number:10220-2973-052121|Y
01|159945|1|1|Special R/Table CNCZ321MA s/n 9540|Y
01|159945|1|2|without Motor. Special Modification Cost Included.|Y
01|159945|2|1|Direct Cable|Y
01|159955|1|1|Final Part Number: CAT40-SK10-150UP-IDU-MDIN|Y
01|159963|1|1|1st Batch|Y
01|159963|2|1|1st Batch|Y
01|159995|3|1|Tilt and Rotary Axis external cables sets.|Y
01|160037|1|1|Special price for Otics|Y
01|160037|1|2|Quated as net pricing|Y
01|160049|2|1|WAREHOUSE 2 TAT-321; ADDITIONAL $1000 GIVEN OFF LP|Y
01|160049|4|1|INSTALLATION INTERFACE INCLUDES AMPLIFIER CABLING|Y
01|160049|4|2|FIBER OPTICS & OTHER HARDWARE ITEMS REQUIRED FOR|Y
01|160049|4|3|TABLE INSTALLATION.|Y
01|160051|2|1|WAREHOUSE 2 TAT-401; ADDITIONAL $1000 GIVEN OFF LP|Y
01|160051|4|1|INSTALLATION INTERFACE INCLUDES AMPLIFIER CABLING|Y
01|160051|4|2|FIBER OPTICS & OTHER HARDWARE ITEMS REQUIRED FOR|Y
01|160051|4|3|TABLE INSTALLATION.|Y
01|160053|4|1|In stock balanceable version. Once this holder is sold|Y
01|160053|4|2|it will be a discontinued part.|Y
01|160053|6|1|In stock alternative|Y
01|160075|1|1|Tim/1st Batch after Sample APRV|Y
01|160078|1|1|Item is a non standard special and is not cancelable|Y
01|160078|1|2|nor returnable once ordered|Y
01|160080|8|1|Replaces SKN-6WB|Y
01|160104|1|1|Priced at NET priceno additional discount|Y
01|160104|1|2|Not returnable nor cancelable once ordered|Y
01|160104|2|1|Priced at NET priceno additional discount|Y
01|160104|2|2|Not returnable nor cancelable once ordered|Y
01|160104|4|1|Priced at NET priceno additional discount|Y
01|160104|4|2|Not returnable nor cancelable once ordered|Y
01|160106|1|1|includes power and feedback cables from the table to|Y
01|160106|1|2|the machine bulkhead|Y
01|160124|3|1|10 pcs in JPN 2-3 wks remaining pieces 3 months ARO|Y
01|160129|1|1|Replaces SKN-10B.|Y
01|160134|4|1|OS15213|Y
01|160134|8|1|KT151913|Y
01|160166|1|1|Delivery: We will have 50-pcs arriving week of 07/12.|Y
01|160176|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|160176|2|1|***W2 / Used - sold as-is|Y
01|160176|2|2|this cannot be cancelled or returned|Y
01|160204|2|1|**Verify machine for DIN**|Y
01|160225|2|1|Heidenhain +/-3 scale with mounting kit.|Y
01|160225|3|1|Custom cable for scale and encoder|Y
01|160227|1|1|Positioning block to be supplied by end user.|Y
01|160242|2|1|4th axis Installation 4th axis Interface Complete|Y
01|160249|1|1|1st Batch/for stock|Y
01|160249|2|1|1st Batch/for stock|Y
01|160249|3|1|1st Batch/for stock|Y
01|160291|1|1|*draw nut supplied without threads|Y
01|160294|2|1|Includes 4th&5th axis Interface power&feed back|Y
01|160294|2|2|cables for rotary installation|Y
01|160294|2|3|Note ** We will need to know more about the Doosan|Y
01|160294|2|4|Control and control options to make sure there are not|Y
01|160294|2|5|additional items required|Y
01|160299|3|1|Tailstock sub-plate to match spindle pitch.|Y
01|160301|1|1|Reference RGA# LVR-57145|Y
01|160301|1|2|Repair of MZQ47-ER32X-OFF s/n:4027406 (Mimatic# 124034)|Y
01|160301|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|160301|2|2|1 input and 1 output spindle|Y
01|160302|1|1|Howa Chuck H037M8 Z-187|Y
01|160302|1|2|Howa Power Chuck for Okuma LNC-8T|Y
01|160302|1|3|Draw nut without threads|Y
01|160302|1|5|*replaces discontinued model: H027M8 R-487|Y
01|160319|9|1|MZMP46-ER32X-OFF-ICE|Y
01|160319|9|2|Quoted at NET pricing|Y
01|160331|3|1|A $7000.00 Tool Cert will cover requested holders|Y
01|160331|3|2|Methods issues a PO for $7000.00 Tool Cert & your net|Y
01|160331|3|3|is $3500.00|Y
01|160335|28|1|1 for ER32 Cat40 Holder 1 for BMT65 SK20 live tool|Y
01|160335|40|1|1/4 drill|Y
01|160335|41|1|.375 drill|Y
01|160335|42|1|7/16 drill|Y
01|160335|43|1|1/2 drill|Y
01|160337|6|1|Wrenches are included.|Y
01|160353|1|1|Howa Chuck H037M8 Z-187|Y
01|160353|1|2|Howa Power Chuck for Okuma LNC-8T|Y
01|160353|1|3|Draw nut without threads|Y
01|160353|1|5|*replaces discontinued model: H027M8 R-487|Y
01|160381|9|1|MZMP46-ER32Z-SUB|Y
01|160382|1|1|Per our conversation - this price is to convert|Y
01|160382|1|2|the 5 axis table from GA Tech to Okuma Mill all items|Y
01|160382|1|3|Including Labor- this does not include freight. Morris|Y
01|160382|1|4|to install.|Y
01|160394|1|1|Net Price includes cost of baluff chip: BIS-C-122-04/L|Y
01|160394|2|1|Net Price includes cost of baluff chip: BIS-C-122-04/L|Y
01|160394|5|1|Net Price includes cost of baluff chip: BIS-C-122-04/L|Y
01|160394|6|1|1 week after b/o arrives for modification|Y
01|160394|7|1|NC4006-1250-4.00-IDI|Y
01|160394|7|2|Net Price includes cost of baluff chip: BIS-C-122-04/L|Y
01|160394|10|1|Above holder can't have chip intalled due to clearance|Y
01|160401|1|1|1st Batch|Y
01|160410|16|1|20 pcs due in week of 7/19 & 36 pcs due week of 9/6|Y
01|160410|27|1|1 set in stock ETA 10/4 for additional set|Y
01|160411|1|1|C5001-27-100|Y
01|160411|1|2|CAT50 27mm Shell Mill Holder 100mm G.L.|Y
01|160411|1|3|Delivery: 8-10 Weeks ARO and signed & approved drawing|Y
01|160411|2|1|C5001-27-100|Y
01|160411|2|2|CAT50 27mm Shell Mill Holder 100mm G.L.|Y
01|160411|2|3|Delivery: 8-10 Weeks ARO and signed & approved drawing|Y
01|160411|3|1|C5001-27-100|Y
01|160411|3|2|CAT50 27mm Shell Mill Holder 100mm G.L.|Y
01|160411|3|3|Delivery: 8-10 Weeks ARO and signed & approved drawing|Y
01|160411|6|1|C5001-32-150|Y
01|160411|6|2|CAT50 32mm Shell Mill Holder 150mm G.L.|Y
01|160411|6|3|Delivery: 8-10 Weeks ARO and signed & approved drawing|Y
01|160411|7|1|C5001-32-150|Y
01|160411|7|2|CAT50 32mm Shell Mill Holder 150mm G.L.|Y
01|160411|7|3|Delivery: 8-10 Weeks ARO and signed & approved drawing|Y
01|160411|8|1|C5001-32-150|Y
01|160411|8|2|CAT50 32mm Shell Mill Holder 150mm G.L.|Y
01|160411|8|3|Delivery: 8-10 Weeks ARO and signed & approved drawing|Y
01|160411|11|1|C5001-32-200|Y
01|160411|11|2|CAT50 32mm Shell Mill Holder 200mm G.L.|Y
01|160411|11|3|Delivery: 8-10 Weeks ARO and signed & approved drawing|Y
01|160411|12|1|C5001-32-200|Y
01|160411|12|2|CAT50 32mm Shell Mill Holder 200mm G.L.|Y
01|160411|12|3|Delivery: 8-10 Weeks ARO and signed & approved drawing|Y
01|160411|13|1|C5001-32-200|Y
01|160411|13|2|CAT50 32mm Shell Mill Holder 200mm G.L.|Y
01|160411|13|3|Delivery: 8-10 Weeks ARO and signed & approved drawing|Y
01|160430|1|1|includes coolant tube and balluff chip|Y
01|160430|2|1|includes coolant tube and balluff chip|Y
01|160436|1|1|This Quote is for a DEMO UNIT in WH2|Y
01|160436|2|1|Included with Purchase of SF-START2-UNIT|Y
01|160439|12|1|Quoted as an in stock option only one left more due in|Y
01|160439|12|2|October|Y
01|160482|1|1|NT50U-1.1/2B-555|Y
01|160482|1|2|Milling Arbor|Y
01|160482|1|3|Quoted as NET pricing non-returnable non-cancelable|Y
01|160487|21|1|non-cancelable/non-returnable after receipt of PO|Y
01|160487|22|1|non-cancelable/non-returnable after receipt of PO|Y
01|160487|23|1|non-cancelable/non-returnable after receipt of PO|Y
01|160487|24|1|non-cancelable/non-returnable after receipt of PO|Y
01|160487|25|1|non-cancelable/non-returnable after receipt of PO|Y
01|160493|1|1|Alt for T32089|Y
01|160495|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ROTARY|Y
01|160495|3|1|WE HAVE SOME INSTALLATION SLOTS AVAILABLE IN LATE JULY|Y
01|160495|3|2|AND PLENTY OF SLOTS AVAILABLE THROUGHOUT AUGUST|Y
01|160511|3|1|Installation includes: Dual axis drive unit short bar|Y
01|160511|3|2|fiber optic cables communications cables bulkhead|Y
01|160511|3|3|cables external cables parameter changes service|Y
01|160511|3|4|time and travel.|Y
01|160535|2|1|EXT POWER CABLE SET|Y
01|160535|2|2|EXT FEEDBACK CABLE SET|Y
01|160544|1|1|***Pricing is for testbar without installed pull stud.|Y
01|160544|1|2|Pull stud is required for holder use and will be added|Y
01|160544|1|3|and quoted as customer advises***|Y
01|160567|3|1|Please Note: 1 each comes with Pre-Setter at no charge.|Y
01|160583|40|1|Quoted same as Techniks on additional tools page.|Y
01|160583|41|1|Wrench for tool above|Y
01|160583|42|1|Quoted same as Techniks on additional tools page.|Y
01|160583|43|1|Wrench for tool above|Y
01|160583|44|1|Quoted same as Techniks on additional tools page.|Y
01|160583|45|1|Quoted same as Techniks on additional tools page.|Y
01|160583|46|1|Quoted same as Techniks on additional tools page.|Y
01|160583|46|2|4.5 GL vs 4.6|Y
01|160589|1|1|Non standard stock item is not cancelable or returnable|Y
01|160589|1|2|once order is placed to the factory|Y
01|160603|1|1|This item is considered a non standard stock special.|Y
01|160603|1|2|Once an order is placed to the factory your PO will be|Y
01|160603|1|3|non cancelable nor returnable|Y
01|160615|37|1|Replaces N14 0-1/2 & C4003-0003-1.58|Y
01|160615|41|1|Replaces N11 0-3/8 & C4003-0002|Y
01|160642|1|1|P/N: S24-ZMACX25-190V|Y
01|160642|1|2|Straight Shank Deep Hold ZMACX Boring Bar|Y
01|160642|1|3|Please note: The boring bar comes with (1) 3MP-C2|Y
01|160642|1|4|0.2 radius installed.|Y
01|160642|2|1|Insert Boring Bar 10-pc package of inserts for Steel|Y
01|160642|2|2|0.4 Nose Radius    Part # 3MP-C4(T1500Z)|Y
01|160644|1|1|1st Batch|Y
01|160644|2|1|1st Batch|Y
01|160647|2|1|EXTERNAL POWER CABLE SET|Y
01|160647|2|2|EXTERNAL FEED BACK CABLE SET|Y
01|160649|2|1|EXTERNAL POWER CABLE SET|Y
01|160649|2|2|EXTERNAL FEED BACK CABLE SET|Y
01|160660|1|1|For PBI TEST|Y
01|160668|1|1|Discount reflects non-returnable test tool|Y
01|160668|2|1|Discount reflects non-returnable test tool|Y
01|160682|1|1|1st Batch/Stock 4/14/21:DWG Approved by BT|Y
01|160683|1|1|Discount reflects non-returnable test tool|Y
01|160683|2|1|Discount reflects non-returnable test tool|Y
01|160683|3|1|Discount reflects non-returnable test tool|Y
01|160710|1|1|Howa hard jaw set for H037M10|Y
01|160715|2|1|6+1 RJ|Y
01|160739|1|1|Option1 - Nut Dia on Milling Chuck is 2.027|Y
01|160739|6|1|Option 2 - Nut Dia on SK20 is 1.909|Y
01|160739|10|1|Factory Recommends Torque Wrench for all Nut Holders|Y
01|160739|10|2|Repeatable process correct gripping force from holders|Y
01|160739|10|3|to met runout T.I.R. Specs|Y
01|160750|1|1|Tooling Certificate Number: 13687-2741-090420|Y
01|160763|1|1|Install E16-NUT & ER16-SCREW(C)|Y
01|160763|2|1|Install E16-NUT & ER16-SCREW(C)|Y
01|160763|3|1|Install E16-NUT & ER16-SCREW(C)|Y
01|160763|4|1|1st Batch/Install E25-NUT & ER25-SCREW(C)|Y
01|160763|5|1|Install E32-NUT & ER32-SCREW(C)|Y
01|160763|6|1|Install E16-NUT & ER16-SCREW(C)|Y
01|160763|7|1|Install E16-NUT & ER16-SCREW(C)|Y
01|160763|8|1|Install E32-NUT & ER32-SCREW(C)|Y
01|160763|9|1|Install 3/4-KEYSET A3/8-24|Y
01|160763|10|1|REQ.INS/serialized & create inspect report|Y
01|160765|1|1|This is standard pitch of 60mm.|Y
01|160766|1|1|C5008-12.4 CAT50 Blank Bar|Y
01|160786|1|1|replacement nuts for MNL12-ER32Z-MS-10K|Y
01|160789|1|1|installed with coolant tube and Balluff Chip|Y
01|160790|8|1|Lyndex-Nikken # NBT30-SKT10-60P|Y
01|160790|8|2|NBT30 Dual Contact SK10 Slim Chuck Coolant High Speed|Y
01|160790|8|3|30000rpm|Y
01|160790|9|1|Lyndex-Nikken # NBT30-SKT10-90P|Y
01|160790|9|2|NBT30 Dual Contact SK10 Slim Chuck Coolant High Speed|Y
01|160790|9|3|30000rpm|Y
01|160817|3|1|Closest to 105 GL length|Y
01|160817|3|2|Standard speed version at 15000RPM|Y
01|160817|5|1|Replaces part # SKN-10KJ(GH)|Y
01|160843|1|1|Replacement Casting - CNCZ180LSA3|Y
01|160843|1|2|`|N
01|160843|2|1|Core Trade In|Y
01|160848|1|1|Lyndex-Nikken Part # N5006-1250-3.125-GKN|Y
01|160848|1|2|UNV_7  NMTB50 1.1/4 End Mill Holder 3.125 Gage Length|Y
01|160848|1|3|with 5-Deg Whistle Notch and 3/4-16 Thread Thur.|Y
01|160858|1|1|Reference RGA# TOR-56824|Y
01|160858|1|2|Repair of BT40-NPU13-80|Y
01|160858|6|1|Repair of BT40-NPU13-80|Y
01|160873|17|1|****Part Number requested by Ewie is (SK16-6C)|Y
01|160873|17|2|Please confirm if our Mechanicaly coolant sealed collet|Y
01|160873|17|3|is what's needed?*****|Y
01|160874|1|1|MOQ is 5 pcs|Y
01|160878|1|1|Lyndex-Nikken # BMT45-SK16Z-HS2-ICE|Y
01|160878|1|2|cMT45; SK16; 90 DEG; 1:2 GEAR12K RPM;ICE TOOL|Y
01|160878|1|3|Pricing reflects NET price for one tool.|Y
01|160878|2|1|Lyndex-Nikken # BMT45-SK16Z-HS2-ICE|Y
01|160878|2|2|BMT45; SK16; 90 DEG; 1:2 GEAR12K RPM;ICE TOOL|Y
01|160878|2|3|Pricing reflects NET price for two tool's.|Y
01|160878|4|1|Lyndex-Nikken # BMT45-ER20Z-HS2-ICE|Y
01|160878|4|2|BMT45; ER20; 90 DEG; 1:2 GEAR12K RPM;ICE TOOL|Y
01|160878|4|3|Pricing reflects NET price for one tool.|Y
01|160878|5|1|Lyndex-Nikken # BMT45-ER20Z-HS2-ICE|Y
01|160878|5|2|BMT45; ER20; 90 DEG; 1:2 GEAR12K RPM;ICE TOOL|Y
01|160878|5|3|Pricing reflects NET price for two tools's.|Y
01|160878|7|1|Lyndex-Nikken # BMT45-ER25Z-HS2-ICE|Y
01|160878|7|2|BMT45; ER25; 90 DEG; 1:2 GEAR12K RPM;ICE TOOL|Y
01|160878|7|3|Pricing reflects NET price for one tool.|Y
01|160878|8|1|Lyndex-Nikken # BMT45-ER25Z-HS2-ICE|Y
01|160878|8|2|BMT45; ER25; 90 DEG; 1:2 GEAR12K RPM;ICE TOOL|Y
01|160878|8|3|Pricing reflects NET price for two tools's.|Y
01|160879|22|1|***Please confirm if On size or coolant sealed needed**|Y
01|160879|23|1|***Please confirm if On size or coolant sealed needed**|Y
01|160881|1|1|ER16 1.5:1 OFFSET Z AXIS HEAD-HEIMATEC # 8 037 44 011|Y
01|160881|1|2|for a Nakamura Tome WT100 Super BMT44|Y
01|160881|2|1|ER16 1.5:1 OFFSET Z AXIS HEAD-HEIMATEC # 8 037 44 011|Y
01|160881|2|2|for a Nakamura Tome WT100 Super BMT44|Y
01|160882|5|1|Ether Unit comes with a set of spindle pots|Y
01|160882|5|2|For holding the tools - CAT40 added for place holder|Y
01|160883|1|1|Replaces part #C5031-1500-8.00|Y
01|160914|1|1|TAR-57050|Y
01|160914|1|2|5AX-201FA-M SN: N/A - No Serial tag|Y
01|160914|1|3|Customer sending in for eval and conversion to|Y
01|160914|1|4|DMG Mori CMX Machine|Y
01|160914|31|1|AX204R030 Rotary Axis Cover|Y
01|160925|1|1|HSK125A 3/8 end mill w/ 6 GL|Y
01|160925|1|2|Part # H125A-0375-6.00|Y
01|160925|2|1|HSK125A 1/2 end mill w/ 6 GL|Y
01|160925|2|2|Part # H125a-0500-6.00|Y
01|160925|3|1|HSK125A 1.1/4 End mill w/ 6 GL|Y
01|160925|3|2|Part # H125A-1250-6.00|Y
01|160973|1|1|Includes Power and Feed back cables from Nikken table|Y
01|160973|1|2|to Machine Bulkhead|Y
01|160975|1|1|HSK50E ER16 Solid Nut Collet Chuck - 80mm GL|Y
01|160975|1|2|Part # HSK50E-ER16S-80|Y
01|160975|2|1|HSK50E 1/4 Shrink 60mm GL|Y
01|160975|2|2|Part # H50E-SF0250-60CP|Y
01|160975|3|1|HSK50E 1/2 Shrink 60mm GL|Y
01|160975|3|2|Part # H50E-SF0500-60CP|Y
01|161016|1|1|Reference RGA# TOR-57222|Y
01|161016|1|2|Repair of S20-UMT|Y
01|161016|2|1|Recalibration included.|Y
01|161018|2|1|Direct Replacement for C4017-0025-4.00|Y
01|161018|3|1|Direct Replacement for C4027-0020-6.00|Y
01|161018|4|1|Direct Replacement for C4016-0375-4.00|Y
01|161018|5|1|Direct Replacement for C4016-0500-4.00|Y
01|161018|10|1|Replaces C40-TOOLJAW|Y
01|161020|1|1|1st Batch *Elco STD item|Y
01|161026|4|1|Delivery is based upon customer receipt of tooling.|Y
01|161026|4|2|Lyndex-Nikken will work with your customer to make|Y
01|161026|4|3|the positioning block.|Y
01|161028|3|1|Quoted as an in stock option.|Y
01|161029|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|161030|4|1|Discount reflects demo pre-setter stock in CT.|Y
01|161030|5|1|Discount reflects demo CAT40 Guage stock in CT.|Y
01|161030|7|1|Optional: Table Top Unit sturdy bench/stand|Y
01|161030|7|2|highly recomended|Y
01|161031|1|1|Qty 100-499|Y
01|161031|2|1|Qty 500+|Y
01|161043|7|1|Would need to combine the CA40 MT$ holder with the|Y
01|161043|7|2|NMTB40 adaptor|Y
01|161044|1|1|Nut for HSK40E-VC6 holder|Y
01|161050|2|1|ETA - Ship week of 8/9|Y
01|161050|5|1|Sealed @ same price|Y
01|161050|9|1|For the 3/4|Y
01|161050|10|1|For the 3/4 - Sealed @ Same Price|Y
01|161056|1|1|Tooling Certificate Number: E15700-2958-050621|Y
01|161069|1|1|MOD for 4 of CAT40-ER20-4.00 & 4 of C4007-0020-4.00|Y
01|161080|3|1|1 Boring Bar Holder 4 Output (2 Main & 2 Sub)|Y
01|161098|6|1|Schunk adapter plate for KSP-LH Plus|Y
01|161113|6|1|replaces C40R5-0562-3.02|Y
01|161118|1|1|Tim confirmed all 24 stock pcs have chip holes|Y
01|161118|3|1|All tool holders MUST have chip hole|Y
01|161142|1|1|Extra 13% added due to unit being display model|Y
01|161142|5|1|Item Added for pricing|Y
01|161142|8|1|Item Added for pricing|Y
01|161142|9|1|Item Added for pricing|Y
01|161143|1|1|88.700.40|Y
01|161143|2|1|40.640.5/8Z.4|Y
01|161143|3|1|40.640.3/4Z.4|Y
01|161143|4|1|40.640.1/2Z.4|Y
01|161143|5|1|40.640.1/4Z.4|Y
01|161143|6|1|NBT40 Dual Contact Shrink Fit Holder 3/16 Coolant Ports|Y
01|161143|6|2|Lyndex-Nikken Part # NBT40-SF0187-3.54CP|Y
01|161143|6|3|40.640.3/16Z|Y
01|161143|7|1|40.640.1/8Z|Y
01|161143|8|1|40.640.3/8Z.4|Y
01|161143|12|1|40.644.3/8Z.4|Y
01|161143|13|1|40.644.3/4Z.4|Y
01|161143|14|1|40.520.20|Y
01|161143|15|1|40.521.20|Y
01|161143|16|1|40.522.20|Y
01|161143|17|1|40.520.32|Y
01|161143|18|1|40.521.32|Y
01|161143|19|1|40.522.32|Y
01|161143|24|1|78.1/2Z0.1/8Z.2|Y
01|161143|25|1|78.1/2Z0.3/16Z.2|Y
01|161143|26|1|78.5/8Z0.1/4Z.1|Y
01|161143|27|1|BBT40-SMC.750-2|Y
01|161143|28|1|BBT40-SMC1.000-2|Y
01|161143|30|1|B4017-0011-4.00 ER11|Y
01|161143|31|1|B4C4-0011-CTO|Y
01|161143|31|2|2.5 as opposed to 3|Y
01|161157|2|1|Jeff will ask customer to identify which version nut|Y
01|161157|2|2|the have on their CAT50U-NX5-151 spindle speeder|Y
01|161161|1|1|1st Batch/RPLC of 174697 887885 A.W. Miller/Pall Trinit|Y
01|161161|2|1|1st Batch/887885 A.W. Miller/Pall Trinity|Y
01|161180|1|1|Reference CUR-56380|Y
01|161180|1|2|Repair of C50FHM-ER32-215IC-110TP s/n: 19901477 01|Y
01|161180|1|3|(Mimatic# 178139)|Y
01|161180|2|1|Bearings seals o-rings damaged flange adjustment|Y
01|161180|2|2|components stripped housing bolts and 15 degree|Y
01|161180|2|3|positioning pin assembly to be replaced. Recondition 1|Y
01|161180|2|4|input spindle and 1 ER 32 spindle.|Y
01|161183|3|1|Alt: C4007-0011-2.50|Y
01|161184|1|1|Unit is in STOCK at our factory. Delivery from receipt|Y
01|161184|1|2|of order ETA 2-3 weeks.|Y
01|161185|2|1|Quoted at NET price.|Y
01|161203|1|1|Hydraulic unit with 4 stacks|Y
01|161203|1|2|2x for rotary table brake system|Y
01|161203|1|3|2x for Schunk chucks|Y
01|161216|6|1|Adapter palte for Schunk vise|Y
01|161216|15|1|Adapter Plate for Schunk vise|Y
01|161232|1|1|Reference RGA# LVR-57208|Y
01|161232|1|2|Repair of NK103-12000 s/n: A0010 (Alps# NK103-12002)|Y
01|161232|2|1|Bearings o-rings collet nut and spindle to be|Y
01|161232|2|2|replaced.|Y
01|161239|1|1|HSK63A-FMH27-60-60 27mm Dia Face Mill Arbor 60mm GL|Y
01|161239|1|2|NETprice no additional discount|Y
01|161239|1|3|Items are specials not cancelable nor returnable once|Y
01|161239|1|4|order placed to factory|Y
01|161239|2|1|HSK63A-FMH27-60-90 27mm Dia Face Mill Arbor 90mm GL|Y
01|161239|2|2|NET price no additional discount|Y
01|161239|2|3|Items are specials not cancelable nor returnable once|Y
01|161239|2|4|order placed to factory|Y
01|161250|8|1|INCLUDES (1) EIGHT HOUR DAY FOR INSTALLATION|Y
01|161250|8|2|AND TRAINING|Y
01|161251|1|1|PRESETTER INCLUDES TP32 SOFTWARE AND 5 LICENSES|Y
01|161251|8|1|INSTALLATION AND TRAINING OF (2) 8 HOUR DAYS|Y
01|161275|1|1|1ea holder C8-EM1250-80 requires 2ea set screws|Y
01|161285|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|161285|3|1|CUSTOM FACEPLATE ADAPTER (CUSTOMER PROVIDES DRAWING)|Y
01|161285|4|1|WE WILL USE THE AMPLIFIER CURRENTLY IN THE MACHINE|Y
01|161286|1|1|Tooling Certificate Number:13687-2810-120420|Y
01|161286|2|1|Tooling Certificate Number:13687-2967-051421|Y
01|161290|5|1|CLAMP SET TCS-466CDB for H-B0-QC-059|Y
01|161290|5|2|This is an insert tip that customer needs to supply.|Y
01|161290|6|1|H-B0-QC-059 CLAMP; TCS-483D|Y
01|161290|6|2|This is an insert tip that customer needs to supply.|Y
01|161290|14|1|Customer needs to supply TCS-466CDB & TCS-483D|Y
01|161290|19|1|W/PS-123-AIR installed|Y
01|161290|20|1|To be attached at the factory to holder above|Y
01|161290|23|1|Customer needs to supply TCS-466CDB & TCS-483D|Y
01|161290|36|1|On QF|Y
01|161290|39|1|On QF|Y
01|161292|1|1|TABLE IS IN STOCK LEAD TIME IS FOR FINAL INSPECTION|Y
01|161292|2|1|EXT POWER CABLE SET|Y
01|161292|2|2|EXT FEEDBACK CABLE SET|Y
01|161313|1|1|ER32 4mm Coolant Collet - Grade AA|Y
01|161313|1|2|part# E32-157(C)-AA|Y
01|161318|1|1|RGA#TAR-57206 TAT-400 SN:1393|Y
01|161320|2|1|Installation includes: Drive unit short bar fiber opt|Y
01|161320|2|2|bulhead cables external cables parameter changes|Y
01|161320|2|3|servcie time and travel.|Y
01|161332|1|1|H40E-SF0375-1.75  HSK40E Shrink Fit  3/8 X 1.75 Gage|Y
01|161332|1|2|Length. Holders are not supplied with back up screws.|Y
01|161332|1|3|because gage length is to short. Quoted at NET price.|Y
01|161332|1|4|Delivery 9~12 weeks ARO.|Y
01|161332|2|1|Quoted at NET price.|Y
01|161348|1|1|CAPTO C8 AGH;adaptation of the lock pin;|Y
01|161348|1|2|A=98.425mm;L=263mm;1:1 gEAR MAX 4000 RPM; 220Nm;|Y
01|161348|1|3|NO COOLANT|Y
01|161348|1|4|REF DRWG # 00058138|Y
01|161348|1|5|Use lines 3790-3793 on Mimatic log|N
01|161360|3|1|FOOTPEDAL FOR FI-6 UNIT (OPTIONAL NOT REQUIRED)|Y
01|161360|3|2|THIS FOOTPEDAL GIVES YOU THE ABILITY TO HAVE A FREE|Y
01|161360|3|3|HAND IN THE EVENT THAT YOU ARE TRYING TO REMOVE|Y
01|161360|3|4|A BROKEN TOOL FROM A HOLDER.|Y
01|161368|1|1|Okuma MB-5000H|Y
01|161368|1|2|Terms for this quote are Net 90 Days.|Y
01|161369|1|1|BT30-MDSK16-90  *Special|Y
01|161369|2|1|BT30-MDSK6-90    *Special|Y
01|161369|4|1|BT30-MDSK16-90    *Special|Y
01|161369|5|1|BT30-MDSK13-75   *Special|Y
01|161380|1|1|Tooling Certificate Number: 25000-2992-061121|Y
01|161383|1|1|BT30-MDSK16-90   *special|Y
01|161383|1|2|**net price|Y
01|161383|3|1|BT30-MDSK6-90    *special|Y
01|161383|3|2|**net price|Y
01|161383|5|1|special|Y
01|161383|5|2|**net price|Y
01|161383|7|1|BT30-MDSK16-90   *special|Y
01|161383|7|2|**net price|Y
01|161383|9|1|BT30-MDSK13-75   *special|Y
01|161383|9|2|**net price|Y
01|161391|1|1|replacement nut for MZQT47-ER16-AD-SUB|Y
01|161391|3|1|replacement nut for MZQT47-ER25Z-HS|Y
01|161393|1|1|Extra 10% Disc vs Other Brand cheap|Y
01|161401|1|1|Reference RGA# QUA-57084|Y
01|161401|1|2|Repair of MZQT47-ER32Z-MS-OFF s/n: 19906864 10|Y
01|161401|1|3|(Mimatic# 183779)|Y
01|161401|2|1|Bearings seals o-rings input shaft housings and|Y
01|161401|2|2|2 spindle bearings to be replaced.|Y
01|161415|4|1|Replaces C4017-0025-4.00|Y
01|161417|1|1|Reference RGA# QUA-57153|Y
01|161417|1|2|Repair of MZQT47-ER32Z-MS-OFF s/n: 20902734 05|Y
01|161417|1|3|(Mimatic# 183779)|Y
01|161417|2|1|Bearing seals o-ringsinput shaft housings and|Y
01|161417|2|2|2 spindle bearings to be replaced. Tool badly crashed|Y
01|161417|2|3|causing damage housings and breaking alignment pins.|Y
01|161419|1|1|Discountinued model with custom face plate.|Y
01|161419|1|2|No Tool Cert|Y
01|161424|1|1|CAT40-ZL12-105U-IDU|Y
01|161424|1|2|CAT40 #1 Tension/Compression Tap Holder Depth Control|Y
01|161450|1|1|Rotary joint is included|Y
01|161450|1|2|Quoted as net pricing|Y
01|161450|1|3|Non cancellable Non returnable|Y
01|161458|1|1|New Bearings/Seals/Replacement Flange and Support Pins|Y
01|161458|1|2|and Labor|Y
01|161458|1|3|Mimatic/Lyndex Covering cost of new spindles and rework|Y
01|161458|1|4|of housing to accomidate new/bigger bearings|Y
01|161467|6|1|Option line #6 1-2 Weeks|Y
01|161467|6|2|Option Line #7 Used stock Pending Inspection offered at|Y
01|161467|6|3|38% off vs. 28%|Y
01|161472|1|1|Part #AC5-MTA4-145|Y
01|161472|1|2|Polygon C5  Morse Taper #4 Adaptor with 145mm Gage Lgth|Y
01|161472|1|3|DELIVERY: 2 weeks if order is placed before 08/04.|Y
01|161472|1|4|If placed after 08/04 14~16 weeks.|Y
01|161485|1|1|Blank Draw Nut (draw screw) for HO23M12|Y
01|161504|1|1|NBT30-SF10-90|Y
01|161504|1|2|Price for 10+|Y
01|161504|2|1|NBT30-SF12-75|Y
01|161504|2|2|Price for 10+|Y
01|161504|3|1|NBT30-SF15-60|Y
01|161504|3|2|Price for 10+|Y
01|161504|5|1|NBT30-SF16-75|Y
01|161504|5|2|Price for 10+|Y
01|161504|12|1|NBT30-SF8-60|Y
01|161504|12|2|Price for 10+|Y
01|161504|13|1|HSK63A-SF10-90|Y
01|161504|13|2|Price for 10+|Y
01|161504|15|1|HSK63A-SF16-75|Y
01|161504|15|2|Price for 10+|Y
01|161504|17|1|HSK63A-SF25-90|Y
01|161504|17|2|Price for 10+|Y
01|161504|19|1|NBT30-SF25-90|Y
01|161504|19|2|Price for 10+|Y
01|161504|22|1|C4-SF10-35|Y
01|161504|22|2|Price for 10+|Y
01|161504|24|1|C4-SF15-38|Y
01|161504|24|2|Price for 10+|Y
01|161506|1|1|Includes: Alpha 2/5000i motor wire harness pressure|Y
01|161506|1|2|switch soleniod and labour.|Y
01|161512|1|1|P/N: MZQT46-ER25Z-MS  #191633|Y
01|161512|1|2|Mazak Live Z-axis Hor 90deg ER25 MainSub IntC|Y
01|161512|1|3|Internal Coolant Ext Coolant WILL RUN DRY 24/7|Y
01|161512|2|1|P/N: MZQT46-ER25Z-SUB-ICE  # 191353|Y
01|161512|2|2|Mazak Live Z-axis Hor 90deg ER25 SUB IntC|Y
01|161512|2|3|Internal Coolant Ext Coolant WILL RUN DRY 24/4|Y
01|161518|1|1|RGA#TAR-57230|Y
01|161518|1|2|5AX-2002 SN: 2058|Y
01|161518|33|1|Replaces FL7M-2K6H|Y
01|161518|37|1|Replaces 7004|Y
01|161525|1|1|Machine NH5000/Control Mitsubishi M730BM|Y
01|161529|1|1|Includes Power and Feedback Cables from 5AX to|Y
01|161529|1|2|Machine Bulkhead|Y
01|161540|11|1|for new Okuma M460V-5AX|Y
01|161540|14|1|Metric M16 P2 threads|Y
01|161540|14|2|drawing provided|Y
01|161557|3|1|Option 1 Dual Contact|Y
01|161557|4|1|Option 2 without Dual contact no added benefit but in|Y
01|161557|4|2|stock!|Y
01|161574|1|1|Lyndex-Nikken CAT50-SZF25-90U-IDU|Y
01|161574|1|2|CAT50 Bulls Eye Zero Fit Slim Chuck SK25 IdChipHole|Y
01|161574|1|3|With 90mm gage length.|Y
01|161574|1|4|3-PC Minimum Order|Y
01|161582|11|1|Please Note: NBT30-MDSK13-60 is a non standard stock|Y
01|161582|11|2|item. Once a purchase order is placed if cannot be|Y
01|161582|11|3|cancelled or returned.|Y
01|161586|1|1|Reference RGA# LVR-57198|Y
01|161586|1|2|Repair of C8-MRAM-IC  SN: 1990826101|Y
01|161586|1|3|(Mim#162821)|Y
01|161586|2|1|Replace All Bearings Seals and O-Rings|Y
01|161586|2|2|Recondition 1 Spindle|Y
01|161586|2|3|Replace Damaged Housing w/ 4 stripped out threads|Y
01|161586|4|1|Reference RGA# LVR-57198|Y
01|161586|4|2|Repair of MRAM-ER25L-IC  SN: 6555902|Y
01|161586|4|3|(Mim#159991)|Y
01|161586|5|1|Replace All Bearings Seals and O-Rings|Y
01|161586|5|2|Recondition 1 Spindle|Y
01|161616|1|1|Extra disocunt Vs Haimer|Y
01|161623|1|1|Order Part # MZMP5-ER25(X)-SP|Y
01|161623|1|2|Mazak Live VDI50: U-TOOL ER25 EXT COOLANT|Y
01|161623|1|3|1/1 GEAR; MAX 50Nm; 6000 RPM REF DRAWING 00037869|Y
01|161624|20|1|Free 1/4 Test holder with complete collet purchase|Y
01|161626|1|1|TOOL NUMBER 2424|Y
01|161626|2|1|TOOL NUMBER 2121|Y
01|161626|3|1|TOOL NUMBER 1111|Y
01|161626|4|1|COLLET FOR TOOL NUMBER 1111|Y
01|161626|5|1|TOOL NUMBER 1717|Y
01|161626|6|1|COLLET FOR TOOL NUMBER 1717|Y
01|161626|7|1|TOOL NUMBER 303|Y
01|161626|8|1|COLLET FOR TOOL NUMBER 303|Y
01|161653|1|1|NBT40-SK25C-75P-J|Y
01|161653|1|2|BT40 Dual Contact SK25 High Speed Coolant Nut|Y
01|161653|1|3|Nut Parts#: SKN-25B(GH) Labor Cost Included.|Y
01|161653|2|1|NBT40-SK13C-60P-J|Y
01|161653|2|2|BT40 Dual Contact SK13 High Speed Coolant Nut|Y
01|161653|2|3|Nut Parts#: SKN-13B(GH) Labor Cost Included.|Y
01|161653|3|1|NBT40-SK6C-90P-J|Y
01|161653|3|2|BT40 Dual Contact SK6 High Speed Coolant Nut|Y
01|161653|3|3|Nut Code: SKN-6WK(GH) Labor Cost Included.|Y
01|161664|1|1|P/N: NB5006-0375-2.75|Y
01|161664|1|2|BT50 Dual Contact 3/8 End Mill Holder 2.75 g.l.|Y
01|161664|2|1|P/N: NB5006-0375-6.00|Y
01|161664|2|2|BT50 Dual Contact 3/8 End Mill Holder 6.00 g.l.|Y
01|161664|3|1|P/N: NB5006-0500-3.00|Y
01|161664|3|2|BT50 Dual Contact 1/2 End Mill Holder 3.00 g.l.|Y
01|161664|4|1|P/N: NB5006-0500-6.00|Y
01|161664|4|2|BT50 Dual Contact 1/2 End Mill Holder 6.00 g.l.|Y
01|161664|5|1|P/N: NB5006-0625-3.00|Y
01|161664|5|2|BT50 Dual Contact 5/8 End Mill Holder 3.00 g.l.|Y
01|161664|6|1|P/N: NB5006-0625-6.00|Y
01|161664|6|2|BT50 Dual Contact 5/8 End Mill Holder 6.00: g.l.|Y
01|161664|7|1|P/N: NB5006-0750-3.00|Y
01|161664|7|2|BT50 Dual Contact 3/4 End Mill Holder 3.00 g.l.|Y
01|161664|8|1|P/N: NB5006-0750-6.00|Y
01|161664|8|2|BT50 Dual Contact 3/4 End Mill Holder 6.00 g.l.|Y
01|161664|9|1|P/N: NB5006-1000-4.00|Y
01|161664|9|2|BT50 Dual Contact 1 End Mill Holder 4.00 g.l.|Y
01|161664|10|1|P/N: NB5006-1000-6.00|Y
01|161664|10|2|BT50 Dual Contact 1 End Mill Holder 6.00 g.l.|Y
01|161664|11|1|P/N: NB5006-1250-4.00|Y
01|161664|11|2|BT50 Dual Contact 1.1/4 End Mill Holder 4.00 g.l.|Y
01|161664|12|1|P/N: NB5006-1250-6.00|Y
01|161664|12|2|BT50 Dual Contact 1.1/4 End Mill Holder 6.00 g.l.|Y
01|161664|13|1|P/N: NB5007-0020-4.00|Y
01|161664|13|2|BT50 Dual Contact ER20 Collet Chuck 4.00 g.l.|Y
01|161664|14|1|P/N: NB5007-0020-6.00|Y
01|161664|14|2|BT50 Dual Contact ER20 Collet Chuck 6.00 g.l.|Y
01|161664|15|1|P/N: NB5007-1000-3.50|Y
01|161664|15|2|BT50 Dual Contact 100TG Collet Chuck 3.50 g.l.|Y
01|161664|16|1|P/N: NB5007-1000-5.50|Y
01|161664|16|2|BT50 Dual Contact 100TG Collet Chuck 5.50 g.l.|Y
01|161671|1|1|HSK100A ER40 CHUCK 16.92 GL|Y
01|161674|1|1|to use for 19/32|Y
01|161689|3|1|with Pull Bolt (#PS-123-AIR)|Y
01|161689|4|1|with Pull Bolt (#PS-123-AIR)|Y
01|161689|5|1|with Pull Bolt (#PS-123-AIR)|Y
01|161699|3|1|H63F-SF4-80|Y
01|161699|3|2|HSK63F Shrink Fit Holder 4mm|Y
01|161699|4|1|H63F-SF8-75|Y
01|161699|4|2|HSK63F Shrink Fit Holder 8mm|Y
01|161703|1|1|2 in stock|Y
01|161703|2|1|4 in stock|Y
01|161714|2|1|Lyndex-Nikken to make block.|Y
01|161714|2|2|Delivery is from receipt of spindle drawing spec.|Y
01|161719|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|161719|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|161720|2|1|EXTERNAL FEED BACK CABLE SET|Y
01|161720|2|2|EXTERNAL POWER CABLE SET|Y
01|161724|1|1|1st batch|Y
01|161724|2|1|1st batch|Y
01|161725|2|1|Non-returnable non-cancelable|Y
01|161740|12|1|HSK100A-TC0562-3.23|Y
01|161740|12|2|HSK100A #1 Tension/Compression Tap Holder|Y
01|161740|12|3|Range Metric M1~M14 Tap #1|Y
01|161740|13|1|HSK100A-TC0875-4.41|Y
01|161740|13|2|HSK100A #2 Tension/Compression Tap Holder|Y
01|161740|13|3|Range Metric M4~M18 Tap #2|Y
01|161744|3|1|INTERFACE FANUC COMPONENTS/HARDWARE ONLY|Y
01|161744|3|2|Delivery confirm until we receive PO|Y
01|161761|13|1|to hold 7/8|Y
01|161785|2|1|Wrench for ER16 holder|Y
01|161785|5|1|Wrench for ER20 holders|Y
01|161807|8|1|*DIN Modified|Y
01|161807|9|1|*DIN Modified|Y
01|161807|10|1|*DIN Modified|Y
01|161807|11|1|*DIN Modified|Y
01|161807|13|1|New part# NC5001-1250-1.75CP-DIN-M|Y
01|161807|13|2|NCAT50 1.1/4 Face / Shell Mill Holder DIN|Y
01|161807|13|3|*exit of coolant - coolant ports|Y
01|161811|2|1|H-ER32I|N
01|161821|2|1|ETA - Ship week of 8/9|Y
01|161821|5|1|Sealed @ same price|Y
01|161821|9|1|For the 3/4|Y
01|161821|10|1|For the 3/4 - Sealed @ Same Price|Y
01|161848|23|1|eta IL week of 8/16|Y
01|161848|24|1|ETA to IL Week of 8/30|Y
01|161855|6|1|SKG-22  SK Back Up Screw|Y
01|161861|2|1|Lyndex-Nikken to make position block|Y
01|161861|2|2|Delivery is based on receipt of spindle drawing info|Y
01|161861|2|3|*NET price|Y
01|161890|2|1|Lyndex-Nikken to make position block|Y
01|161890|2|2|Delivery is based on receipt of spindle drawing info|Y
01|161890|2|3|*NET price|Y
01|161902|1|1|Installed w/PS-123-AIR at factory|Y
01|161902|2|1|Installed on NC5-46-C12-55 at factory|Y
01|161902|4|1|Installed w/PS-123-AIR at factory|Y
01|161902|5|1|Installed on NC5-46-C12-55 at factory|Y
01|161902|8|1|Installed w/PS-123-AIR at factory|Y
01|161902|9|1|Installed on NC5-46-SK2C-75 at factory|Y
01|161902|12|1|Installed w/PS-123-AIR at factory|Y
01|161902|13|1|Installed on NC5-46-SK10C-75 at factory|Y
01|161902|16|1|Installed w/PS-123-AIR at factory|Y
01|161902|17|1|Installed on NC5-46-SK10C-75 at factory|Y
01|161902|20|1|Installed w/PS-123-AIR at factory|Y
01|161902|21|1|Installed on NC5-46-SK10C-75 at factory|Y
01|161902|24|1|Installed w/PS-123-AIR at factory|Y
01|161902|25|1|Installed on NC5-46-C12-55 at factory|Y
01|161902|28|1|Installed w/PS-123-AIR at factory|Y
01|161902|29|1|Installed on NC5-46-SK10C-75 at factory|Y
01|161902|32|1|Installed w/PS-123-AIR at factory|Y
01|161902|33|1|Installed on NC5-46-SK10C-75 at factory|Y
01|161902|36|1|Installed w/PS-123-AIR at factory|Y
01|161902|37|1|Installed on NC5-46-C12-55 at factory|Y
01|161927|1|1|1st Batch|Y
01|161927|2|1|1st Batch|Y
01|161927|3|1|1st Batch|Y
01|161927|4|1|1st Batch|Y
01|161927|5|1|1st Batch|Y
01|161927|6|1|1st Batch|Y
01|161938|1|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|161938|2|1|Req.INS/Install E20-NUT-G & ER20-SCREW(C)|Y
01|161938|3|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|161938|4|1|1st Batch/(9)882246 *Used buy from Elco|Y
01|161938|5|1|Req.INS/Install E32-NUT ER32-SCREW(C)/(5)881658|Y
01|161938|6|1|1st Batch/(2)882815 Price Products|Y
01|161950|10|1|Installation includes: Dual axis drive short bar|Y
01|161950|10|2|fiber optic cables communications cables bulkhead|Y
01|161950|10|3|cables external cables parameter changes service|Y
01|161950|10|4|and travel.|Y
01|161981|1|1|Tooling Certificate # 13700TA-2988-060921|Y
01|161983|1|1|Tooling Certificate # 13700TA-2988-060921|Y
01|161984|1|1|Tooling Certificate No: 13700TA-2988-060921|Y
01|161991|1|1|Tooling Certificate No: 13700TA-2988-060921|Y
01|161996|1|1|Tooling Certificate No: 13700TA-2988-060921|Y
01|162001|1|1|This item is considered speical once ordered cannot|Y
01|162001|1|2|be canceled or returned|Y
01|162002|1|1|INS/Cheersun STD Collet|Y
01|162002|2|1|INS/Cheersun STD Collet|Y
01|162002|3|1|INS/Cheersun STD Collet|Y
01|162002|4|1|INS/Cheersun STD Collet|Y
01|162002|5|1|INS/Cheersun STD Collet|Y
01|162002|6|1|INS/Cheersun STD Collet|Y
01|162002|7|1|INS/Cheersun STD Collet|Y
01|162002|8|1|INS/Cheersun STD Collet|Y
01|162002|9|1|INS/Cheersun STD Collet|Y
01|162002|10|1|INS/Cheersun STD Collet|Y
01|162014|1|1|Tooling Certificate Number: 13687-3009-063021|Y
01|162023|1|1|1pc Pricing|Y
01|162023|2|1|2pc Pricing|Y
01|162036|2|1|NBT40-C20-70|Y
01|162036|2|2|NBT40 Dual Contact 20mm Milling Chuck 10000rpm|Y
01|162036|10|1|NBT40-C25-105|Y
01|162036|10|2|NBT40 Dual Contact 25mm Milling Chuck 10000rpm|Y
01|162036|12|1|NBT40-C25-105G|Y
01|162036|12|2|NBT40 Dual Contact 25mm Milling Chuck  High Speed|Y
01|162038|3|1|9UNTC100-PLB30|Y
01|162038|3|2|Pull Bolt for Taper Cleaner (BT30)|Y
01|162038|4|1|9UNTC100-PLB40A(CAT)|Y
01|162038|4|2|Pull Bolt for Taper Cleaner (CAT40)|Y
01|162038|7|1|NBT30-SK16-135  NOTE: Special Order Item|Y
01|162038|7|2|NBT30 Dual Contact SK13 Slim Chuck|Y
01|162038|15|1|NBT30-SK13C-150|Y
01|162038|15|2|NBT30 Dual Contact SK13 Slim Chuck Coolant|Y
01|162039|1|1|Includes cables|Y
01|162045|1|1|1st Batch|Y
01|162052|1|1|Part # 5AX-350FA-RJ6|Y
01|162052|1|2|Replacement SN 3546|Y
01|162052|1|3|Table + Motors + Rotary Joint + Baseplate for Ship|Y
01|162052|3|1|WH2 Used Table we have here|Y
01|162052|3|2|Table will have new internal components|Y
01|162057|8|1|*DIN Modified|Y
01|162057|9|1|*DIN Modified|Y
01|162057|10|1|*DIN Modified|Y
01|162057|11|1|*DIN Modified|Y
01|162057|13|1|New part# NC5001-1250-1.75CP-DIN-M|Y
01|162057|13|2|NCAT50 1.1/4 Face / Shell Mill Holder DIN|Y
01|162057|13|3|*exit of coolant - coolant ports|Y
01|162065|6|1|This item is considered special once ordered cannot|Y
01|162065|6|2|be cancelled or returned. Net price has been quoted|Y
01|162065|6|3|no further discount should be taken|Y
01|162069|4|1|Local Lyndex Nikken Support - Lyndex Nikken will|Y
01|162069|4|2|Install and train.|Y
01|162078|4|1|Local Lyndex Nikken Support - Lyndex Nikken will|Y
01|162078|4|2|Install and Train|Y
01|162081|4|1|Local Lyndex Nikken Support - Lyndex Nikken will|Y
01|162081|4|2|Install and Train|Y
01|162082|3|1|Include with the Fi6 Unit|Y
01|162082|7|1|Optional|Y
01|162082|10|1|Included with start2 unit|Y
01|162082|11|1|Optional extra cool unit|Y
01|162082|12|1|Optional|Y
01|162091|1|1|Billing only*|Y
01|162091|2|1|Billing only*|Y
01|162091|3|1|Billing only*|Y
01|162091|4|1|Billing only*|Y
01|162091|5|1|Billing only*|Y
01|162091|6|1|This item needs to be shipped to Sig|Y
01|162102|1|1|Updated GL 5.75|Y
01|162110|1|1|1st batch|Y
01|162110|2|1|1st batch|Y
01|162110|3|1|1st Batch(w/ScrewOnKey)|Y
01|162114|1|1|***synchronized machining centers only|Y
01|162114|4|1|collet can work with either holder listed above|Y
01|162138|1|1|Reference RGA# LVR-57250|Y
01|162138|1|2|Repair of BMT65-ER32Z-MS s/n: 77877 14|Y
01|162138|1|3|(Mimactic# 186493)|Y
01|162138|2|1|Bearings seals o-rings gears and output spindles|Y
01|162138|2|2|(As result of crach)|Y
01|162149|1|1|1st Batch(w/ScrewOnKey)|Y
01|162149|2|1|1st Batch(w/ScrewOnKey)|Y
01|162149|3|1|1st Batch(w/ScrewOnKey)|Y
01|162149|4|1|1st Batch(w/ScrewOnKey)|Y
01|162149|5|1|1st Batch(w/ScrewOnKey)|Y
01|162149|6|1|1st Batch(w/ScrewOnKey)|Y
01|162149|7|1|1st Batch(w/ScrewOnKey)|Y
01|162149|8|1|1st Batch|Y
01|162149|9|1|1st Batch(w/ScrewOnKey)|Y
01|162177|1|1|** Reconfirm Center Height **|Y
01|162177|1|2|Discount based on Qty quoted.|Y
01|162183|2|1|NET cost to modify the draw screw thread to cust spec|Y
01|162185|2|1|CASE-MIM-170957 & Wrenches x2 Included|Y
01|162185|2|2|Completed questionnaire required for approval before|Y
01|162185|2|3|order will be accepted|Y
01|162185|3|1|Priced at NET cost no additional discount|Y
01|162185|6|1|Ship due date was 8/20 so due in any day now|Y
01|162187|2|1|Labor on Site Installation CNC202FA-M|Y
01|162187|3|1|External Cables Fanuc for CMX1100|Y
01|162188|3|1|Include Labor on Site and Hardware FANUC|Y
01|162195|1|1|For VDI40 mount|Y
01|162207|1|1|(Not for Erickson Quick Change)|Y
01|162208|1|1|Reference RGA# LVR-57256|Y
01|162208|1|2|Repair of 1 x MNZ20-SK16Z-12K s/n: 1990368614|Y
01|162208|1|3|(Mimatic# 196235)|Y
01|162208|2|1|Bearings seals o-rings to be replaced. Recondition|Y
01|162208|2|2|1 input spindle and 1 output spindle.|Y
01|162208|4|1|Repair of 1 x MNZ20-SK16Z-ICE-12K s/n: 1990230502|Y
01|162208|4|2|(Mimatic# 193643)|Y
01|162208|5|1|Bearings seals o-rings to be replaced. Recondition|Y
01|162208|5|2|1 output spindle.|Y
01|162256|1|1|All spacers included with tool holder|Y
01|162262|1|1|Reference RGA# LVR-57273|Y
01|162262|1|2|Repair of MZQT47-ER32X-OFF-ICE s/n: 99136 04|Y
01|162262|1|3|(Mimatic# 124259)|Y
01|162262|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|162262|2|2|1 input spindle & 1 output spindle.|Y
01|162264|2|1|Includes 3pc/jaw set|Y
01|162266|1|1|RAH come with Wrench: WRENCH-MIM-170734|Y
01|162296|1|1|5 pc. min order Qty.|Y
01|162296|2|1|NCAT40-SF3-130CP|Y
01|162296|2|2|Taper Plus CAT40 3mm Shrink Fit w/ 130mm GL|Y
01|162296|2|3|Coolant Ports - Larger OD at the nose|Y
01|162296|2|4|10+pc|Y
01|162296|4|1|5 pc. min order Qty.|Y
01|162296|5|1|NCAT40-SF0187-5.12CP|Y
01|162296|5|2|Taper Plus CAT40 3/16 Shrink Fit w/ 5.12 GL|Y
01|162296|5|3|Coolant Ports - Larger OD at the nose|Y
01|162296|5|4|10+pc|Y
01|162297|5|1|Etch collets with TAM271851-121.|Y
01|162305|2|1|Quoted at NET price.|Y
01|162311|1|1|Includes Cables and Haas Motors|Y
01|162318|1|1|Special R/Table CNCZ321MA s/n 9540 for Suncall America|Y
01|162319|1|1|Direct Cable for CNCZ321MA S/N 9540|Y
01|162323|1|1|NCAT50-SK20C-224U-RP-J|Y
01|162323|6|1|SKJ25-12.5|Y
01|162323|10|1|NCAT50-RAC43-256KU-C-RP|Y
01|162323|11|1|NCAT50-RAC32-370KU-C-RP|Y
01|162323|12|1|NCAT50-RAC32-256KY-C-RP|Y
01|162323|13|1|NCAT50-ZMAC42-271AAVU-I-RP|Y
01|162323|14|1|NCAT50-ZMAC32-370AAVU-I-RP|Y
01|162323|15|1|MCAT50-FMA31.75-230U-RP|Y
01|162323|16|1|S.RCC-43K|Y
01|162323|17|1|S.RCC-32K|Y
01|162323|18|1|M 5HZ-42V|Y
01|162323|19|1|m 4HZ-2V-I|Y
01|162323|20|1|SKL20-TLS|Y
01|162323|24|1|M2255|Y
01|162324|1|1|SS20-ECH7S-70|Y
01|162324|2|1|SS20-ECH7-70|Y
01|162324|3|1|SSH20-ECH7-70|Y
01|162324|3|2|20mm STR Ext ER11 Collet Chuck Holder with flat|Y
01|162335|1|1|C5006-16-3.00-JS  CAT50 End Mill Holder 16mm|Y
01|162335|1|2|With 3.00 Gage Length & Jet Slots|Y
01|162335|1|3|MINIMUM ORDER 2-PCS|Y
01|162335|2|1|Quoted at NET price.|Y
01|162350|13|1|Alt for 120mm|Y
01|162350|17|1|Alt for 105mm|Y
01|162350|18|1|Alt for 105mm|Y
01|162350|26|1|Alt: Slotted in stock|Y
01|162360|1|1|10000 RPM|Y
01|162361|1|1|Includes Haas Motor and Cables.|Y
01|162370|1|1|HSK63A-ER11-4.33 Balanced @20K RPM G2.5|Y
01|162370|2|1|HSK63A-ER8-4.33 Balanced @20K RPM G2.5|Y
01|162376|1|1|1st Batch|Y
01|162376|2|1|1st Batch|Y
01|162376|3|1|1st Batch y|Y
01|162376|4|1|1st Batch|Y
01|162376|5|1|1st Batch|Y
01|162376|6|1|1st Batch|Y
01|162376|7|1|1st Batch|Y
01|162376|8|1|1st Batch|Y
01|162376|9|1|1st Batch|Y
01|162376|10|1|1st Batch|Y
01|162376|11|1|1st Batch|Y
01|162376|12|1|1st Batch|Y
01|162376|13|1|1st Batch|Y
01|162377|1|1|Non-standard stock item not cancelable nor returnable|Y
01|162377|1|2|once our order is placed to the factory|Y
01|162378|1|1|Sauter Live VDI50-DIN5480 straight MI50 int/extc|Y
01|162378|1|2|Max 1015PSI 1/1 gear 6500 RPM|Y
01|162378|1|3|Order Part # SA5080-MI50X-ICE|Y
01|162378|2|1|SA5080-HSK50A-ICE|Y
01|162378|2|2|Sauter Live VDI50 - DIN5480 Sraight HSK50A L1=106mm|Y
01|162378|2|3|int/ect C max 1015PSI 1/1 Gear 6500 RPM|Y
01|162385|1|1|Reference RGA# LVR-57168|Y
01|162385|1|2|Repair of BMT55-SK20X-ICE s/n: 76625 16|Y
01|162385|1|3|(Mimatic# 187162)|Y
01|162385|2|1|Bearings seals and o-rings to be replaced.|Y
01|162385|4|1|Repair of BMT55-SK20X-ICE s/n: 92010 03|Y
01|162385|4|2|(Mimatic# 187162)|Y
01|162385|5|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|162385|5|2|1 spindle.|Y
01|162385|7|1|Repair of BMT55-SK20Z-85-ICE s/n: 19904095 02|Y
01|162385|7|2|(Mimatic# 192910)|Y
01|162385|8|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|162385|8|2|1 output spindle.|Y
01|162408|1|1|Modified by Lyndex-Nikken with 2-DIN Holes|Y
01|162408|1|2|Net price|Y
01|162408|1|3|This cannot be cancelled or returned once a PO has been|Y
01|162408|1|4|issued.|Y
01|162410|3|1|**Non-returnable/Non-Cancellable|Y
01|162411|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|162423|1|1|Mimatic Special 4mm Whistle Notch Spindle for tool|Y
01|162423|1|2|195926. Similar to original spindle 196786|Y
01|162423|2|1|Mimatic Special 4mm Whistle Notch Spindle for tool|Y
01|162423|2|2|195926. Similar to original spindle 196786|Y
01|162423|3|1|Mimatic Special 4mm Whistle Notch Spindle for tool|Y
01|162423|3|2|195926. Similar to original spindle 196786|Y
01|162423|4|1|Mimatic Special ER8 Spindle for tool 195926|Y
01|162423|5|1|Mimatic Special ER8 Spindle for tool 195926|Y
01|162423|6|1|Mimatic Special ER8 Spindle for tool 195926|Y
01|162425|1|1|For Tooling on Quotation 162424|Y
01|162435|1|1|CNCZ180 SN: 12265|Y
01|162435|1|2|TAR-57122|Y
01|162435|26|1|Part # CN180R010|Y
01|162448|1|1|Delivery: 8-pcs stock / Balance ETA to L-N 9 weeks.|Y
01|162481|5|1|Special Promo Discount|Y
01|162481|6|1|Special Promo Discount|Y
01|162481|7|1|Special Promo Discount|Y
01|162481|9|1|Special Promo Discount|Y
01|162494|3|1|New part#- replaces SKN-10B|Y
01|162494|15|1|New part#- replaces SKN-10B|Y
01|162499|5|1|Special Promo Discount|Y
01|162499|6|1|Special Promo Discount|Y
01|162499|7|1|Special Promo Discount|Y
01|162499|9|1|Special Promo Discount|Y
01|162502|24|1|Alt for 120mm|Y
01|162502|28|1|Alt for 105mm|Y
01|162502|29|1|Alt for 105mm|Y
01|162509|14|1|Alt for 120mm|Y
01|162509|18|1|Alt for 105mm|Y
01|162509|19|1|Alt for 105mm|Y
01|162509|27|1|Alt: Slotted in stock|Y
01|162521|6|1|10% core trade in|Y
01|162521|6|2|New Table less electronics|Y
01|162544|2|1|This is a non-standard stock item but is in stock at|Y
01|162544|2|2|Nikken Japan. This item is considred special once|Y
01|162544|2|3|ordered cannot be cancelled or returned.|Y
01|162551|22|1|Due week of 9/3|Y
01|162551|23|1|remainder due week of 8/17|Y
01|162551|24|1|remainder due week of 8/17|Y
01|162558|3|1|External Coolant|Y
01|162558|4|1|Internal & External Coolant. Can also be run Dry.|Y
01|162558|5|1|100mm Center Height. External Coolant.|Y
01|162558|6|1|72mm Center Height. External Coolant.|Y
01|162558|7|1|72mm Center Height.|Y
01|162558|7|2|Internal & External Coolant. Can also be run Dry.|Y
01|162558|8|1|100mm Center Height.|Y
01|162558|8|2|Internal & External Coolant. Can also be run Dry.|Y
01|162558|14|1|Internal & External Coolant. Can also be run Dry.|Y
01|162558|15|1|72mm Center Height.|Y
01|162558|15|2|Internal & External Coolant. Can also be run Dry.|Y
01|162558|16|1|100mm Center Height.|Y
01|162558|16|2|Internal & External Coolant. Can also be run Dry.|Y
01|162576|1|1|Reference RGA# CUR-57274|Y
01|162576|1|2|Repair of H80FRAM-ER16-206ST s/n: n/a|Y
01|162576|1|3|(Mimatic# 167594)|Y
01|162576|2|1|Bearings seals o-rings 1 input spindle giear set|Y
01|162576|2|2|and ID plate to be replaced.|Y
01|162592|6|1|need to check if customer needs/ this is an option|Y
01|162603|1|1|CAT40-Z12-100U >>CAT40 #1 Tension/Compression Tap|Y
01|162603|1|2|holder. This item does not come with an ID Chip Hole|Y
01|162603|1|3|like the CAT40-Z12-100U-IDU that Handy has ordered.|Y
01|162605|1|1|Replacement Table - mechanical side only CNCZ180 12226C|Y
01|162605|1|2|electrical items will be reused|Y
01|162605|1|3|See TAR-57122 QT 162435 for repair quote|Y
01|162608|10|1|STH1-SK16-130|Y
01|162608|10|2|Straight Shank Extension OD1(25.4mm) SK16 Slim Chuck|Y
01|162608|18|1|BMT45-SK20Z-MS|Y
01|162608|18|2|BMT45 Live SK20 Z-Axis 90Deg<Axial> ExtCoolan|Y
01|162608|18|3|Two Spindles (Main & Sub)|Y
01|162608|18|4|Minimum Order Qty. 2|Y
01|162610|3|1|Include Hand Labor and HardwarePrice for 2 Install|Y
01|162615|2|1|Hand Labor and Hardware FANUC|Y
01|162620|3|1|Hand Labor and Hardware FANUC|Y
01|162625|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|162627|5|1|9BKU-CNCZ632ZAR|Y
01|162627|7|1|CN503TRJ210060376AL|Y
01|162627|10|1|9BKU-CNCZ632ZAR|Y
01|162627|14|1|9BKU-CNC501RA|Y
01|162627|21|1|NIK-1555-650|Y
01|162664|1|1|Refurbished Motor in Stock|Y
01|162664|3|1|Gear Box/Motor Cover/Motor Gear|Y
01|162664|6|1|Cable Bracket and cover|Y
01|162664|10|1|If you place an order Inspection fee will be waived.|Y
01|162665|1|1|Includes Haas Motor and Cables.|Y
01|162673|1|1|High Torque Bearing Nut as seen in Tool Box Demo|Y
01|162673|2|1|High Torque Bearing Nut as seen in Tool Box Demo|Y
01|162673|5|1|SK Collet System as seen during Toolbox Demo|Y
01|162673|6|1|SK Collet System as seen during Toolbox Demo|Y
01|162674|2|1|Alt stock option:*HOT DEALS** SURPLUS Inventory**|Y
01|162674|2|2|DIST Net $139 EU Net $174 While Qtys Last|Y
01|162674|2|3|***Balanceable***|Y
01|162674|7|1|Alt stock option:*HOT DEALS** SURPLUS Inventory**|Y
01|162674|7|2|DIST Net $227 EU Net $283 While Qtys Last|Y
01|162674|7|3|***Balanceable Heavy-Duty***|Y
01|162691|2|1|Alt stock option:*HOT DEALS** SURPLUS Inventory**|Y
01|162691|2|2|DIST Net $139 EU Net $174 While Qtys Last|Y
01|162691|2|3|***Balanceable***|Y
01|162691|7|1|Alt stock option:*HOT DEALS** SURPLUS Inventory**|Y
01|162691|7|2|DIST Net $227 EU Net $283 While Qtys Last|Y
01|162691|7|3|***Balanceable Heavy-Duty***|Y
01|162692|1|1|Includes: Junction Box External/Interface Cables|Y
01|162692|1|2|Amplifier and B-Axis Cable.|Y
01|162697|1|1|To Be Confirm Once PO received|Y
01|162701|1|1|WIS# TAM271851-59|Y
01|162701|2|1|Marking with Pratt & Whitney part# TAM271851-59|Y
01|162703|1|1|T1|Y
01|162703|2|1|COLLET FOR T1|Y
01|162703|3|1|T2|Y
01|162703|4|1|COLLET FOR T2|Y
01|162703|5|1|T3|Y
01|162703|6|1|COLLET FOR T3|Y
01|162703|7|1|T4|Y
01|162703|8|1|COLLET FOR T4|Y
01|162703|9|1|T6|Y
01|162703|10|1|COLLET FOR T6|Y
01|162703|11|1|T10|Y
01|162703|12|1|COLLET FOR T10|Y
01|162703|13|1|T11|Y
01|162703|14|1|COLLET FOR T11|Y
01|162703|15|1|T14|Y
01|162703|16|1|T15|Y
01|162703|17|1|COLLET FOR T15|Y
01|162703|18|1|T18|Y
01|162703|19|1|COLLET FOR T18|Y
01|162703|20|1|T20|Y
01|162703|21|1|COLLET FOR T20|Y
01|162703|22|1|T22|Y
01|162703|23|1|COLLET FOR T22|Y
01|162703|24|1|T24|Y
01|162703|25|1|COLLET FOR T24|Y
01|162703|26|1|COLLET CAP FOR T24|Y
01|162703|27|1|WRENCH FOR T24 COOLANT CAP|Y
01|162703|28|1|T26|Y
01|162703|29|1|COLLET FOR T26|Y
01|162703|30|1|T27|Y
01|162703|31|1|COLLET FOR T27|Y
01|162703|32|1|T28|Y
01|162703|33|1|COLLET FOR T28|Y
01|162703|34|1|T29|Y
01|162703|35|1|COLLET FOR T29|Y
01|162709|1|1|NBT30-SF12-65|Y
01|162713|1|1|NON-STANDARD STOCK ITEMNON-RETURNABLENON-CANCELABLE|Y
01|162723|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|162734|1|1|cables come out the front|Y
01|162736|1|1|Option 1 for 10MM Drill|Y
01|162736|2|1|Option 1 for 10MM Drill|Y
01|162742|1|1|This is a non-standard stock item and considered a|Y
01|162742|1|2|special...QUOTED AT NET PRICE|Y
01|162743|3|1|We currently only have 1pc in stock in IL. Any addl|Y
01|162743|3|2|pieces needed would have ETA of aprx 4 weeks.|Y
01|162752|8|1|Option #1|Y
01|162752|9|1|Option #2|Y
01|162752|11|1|Option #1|Y
01|162752|12|1|Option #2|Y
01|162752|14|1|Option #1|Y
01|162752|15|1|Option #2|Y
01|162752|23|1|Missing on B/O part#E32-020 5/16 ETA Pending|Y
01|162762|2|1|H63A(80)-SF12-160-IDI|Y
01|162762|2|2|HSK63A 80mm Flange 12mm Shrink Fit w/|Y
01|162762|2|3|160mm (6.30) projection|Y
01|162762|2|4|*Orizon spec: Pan Head Screws for ID Chip Hole|Y
01|162762|2|5|Chip (BIS-C-122-04/L) and coolant tube installed at|Y
01|162762|2|6|factory|Y
01|162762|3|1|*Orizon spec: Pan Head Screws for ID Chip Hole.|Y
01|162762|3|2|Chip (BIS-C-122-04/L) and coolant tube installed at|Y
01|162762|3|3|factory|Y
01|162762|4|1|H63A(80)-SF16-160-IDI|Y
01|162762|4|2|HSK63A 80mm Flange 16mm Shrink Fit w/|Y
01|162762|4|3|160mm (6.30) projection|Y
01|162762|4|4|*Orizon spec: Pan Head Screws for ID Chip Hole|Y
01|162762|4|5|Chip (BIS-C-122-04/L) and coolant tube installed at|Y
01|162762|4|6|factory|Y
01|162762|7|1|H63A(80)-SF25-115-IDI|Y
01|162762|7|2|HSK63A 80mm Flange 25mm Shrink Fit w/|Y
01|162762|7|3|115mm (4.52) projection|Y
01|162762|7|4|*Orizon spec: Pan Head Screws for ID Chip Hole|Y
01|162762|7|5|Chip (BIS-C-122-04/L) and coolant tube installed at|Y
01|162762|7|6|factory|Y
01|162762|8|1|H63A(80)-SF25-160-IDI|Y
01|162762|8|2|HSK63A 80mm Flange 25mm Shrink Fit w/|Y
01|162762|8|3|160mm (6.30) projection|Y
01|162762|8|4|*Orizon spec: Pan Head Screws for ID Chip Hole|Y
01|162762|8|5|Chip (BIS-C-122-04/L) and coolant tube installed at|Y
01|162762|8|6|at factory|Y
01|162767|3|1|B/O ETA 8-27-2021|Y
01|162767|12|1|B/O ETA 8-30-2021|Y
01|162772|2|1|NET price no additional discount|Y
01|162772|2|2|ETA pending customer provided specs|Y
01|162786|1|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|162786|2|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|162786|3|1|Req.INS/Install E32-NUT ER32-SCREW|Y
01|162788|1|1|Part # B50FHM-ER32-220-110TP Mimatic part #|Y
01|162788|1|2|BT50 ER32 Angle Head Flex110mm Pitch Tapered Pin|Y
01|162788|1|3|Spec: 6000rpm 70NmOptn: CASE-MIM-170958 & Wrenches|Y
01|162788|1|4|x2 Included|Y
01|162788|1|5|NET priceno additional discount|Y
01|162788|1|6|Item is a special non cancelable nor returnable once|Y
01|162788|1|7|the order is place to our factory|Y
01|162788|2|1|NET price itemno additional discount given|Y
01|162794|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|162794|3|1|40mm Riser Plate for Atlas 5C Closer|Y
01|162795|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|162803|4|1|Service and travel time of installation of kit.|Y
01|162804|5|1|Old Part# will no longer exist.|Y
01|162804|8|1|2 Stock place order asap so we do not lose inventory.|Y
01|162811|2|1|**THIS ITEM IS IN USED CONDITION**|Y
01|162811|2|2|See photos once ordred cannot be returned|Y
01|162811|2|3|Lyndex Nikken will honor our standard warranty.|Y
01|162826|1|1|Annual on-site table inspection service fee|Y
01|162826|1|2|for Suncall America|Y
01|162829|1|1|Installation Fee for CNCZ321MA|Y
01|162829|1|2|Included Motor replacement / Test drive / Adjustment|Y
01|162832|1|1|Presetter Cover Included with all Presetters|Y
01|162832|1|2|Price includes installation and training|Y
01|162857|2|1|Discontinued - Cannot be cancelled or returned.|Y
01|162867|1|1|HSK100A-FMH22-47-105 HSK100A Face Mill Holder 22mm|Y
01|162867|1|2|Quoted at NET Price.|Y
01|162872|1|1|The stand is included with this model|Y
01|162873|1|1|THngnsoneip|Y
01|162882|1|1|Req.INS/Serializing and creating Inspection Sheet|Y
01|162882|2|1|Req.INS/Serializing and creating Inspection Sheet|Y
01|162887|1|1|Replace output spindle bearings seals and install|Y
01|162887|1|2|re-worked spindles. New precision shims spaces and|Y
01|162887|1|3|threadrings to adjust preload.|Y
01|162887|1|4|Tool# 195926 s/n: 210904302 01|Y
01|162887|1|5|Note: Mimatic does not guarantee performance/TIR of the|Y
01|162887|1|6|reworked spindles as these were not modified in our|Y
01|162887|1|7|facility.|Y
01|162889|1|1|Replace output spindle bearings seals and install new|Y
01|162889|1|2|4mm whistle notch spindles. New precision shims spaces|Y
01|162889|1|3|and threadrings to adjust preload.|Y
01|162889|1|4|Tool# 195926 s/n: 210904302 01|Y
01|162892|1|1|Replace output spindle bearings seals and install new|Y
01|162892|1|2|ER8 spindles. New precision shims spaces and|Y
01|162892|1|3|threadrings to adjust preload.|Y
01|162892|1|4|Tool# 195926 s/n: 210904302 01|Y
01|162908|3|1|Substitute for NCAT50-SF8-80CP.|Y
01|162909|1|1|CNC180MA SN: 10192|Y
01|162909|1|2|TAR-57328|Y
01|162909|1|3|Full rebuild needed - bearings/seals/worm wheel/screw|Y
01|162909|1|4|Recommend to upgrade to new brake system|Y
01|162909|1|5|(Parts included on quote)|Y
01|162914|12|1|Quoted as an in stock option|Y
01|162915|1|1|Reference RGA# LVR-57282|Y
01|162915|1|2|Repair of MZMP46-ER32Z-ICE s/n:74676 15|Y
01|162915|1|3|(Mimatic# 124854)|Y
01|162915|2|1|Bearings seals o-rings and ER32 spindle to be|Y
01|162915|2|2|replaced. Recondition 1 input spindle.|Y
01|162917|1|1|5AX-2MT-105-120SA-BR SN: 8231|Y
01|162917|1|2|TAR-57276|Y
01|162917|1|3|Brake system was not working|Y
01|162917|1|4|Bearings/Seals/Worm Wheel/Screw/Cables need replaced|Y
01|162917|1|5|Full overhaul.|Y
01|162917|4|1|Cable Part # TCE-43398|Y
01|162953|1|1|1 in stock end of August is ETA for the other|Y
01|162954|1|1|ETA approx 2 weeks|Y
01|162957|3|1|Incluye Hardware FANUC(interface)y Mano de Obra|Y
01|162964|1|1|This item is considered special once ordered cannot|Y
01|162964|1|2|be cancelled or returned.|Y
01|162965|1|1|Reference RGA# CUR-57277|Y
01|162965|1|2|Repair of C40RA-0025M s/n: 75435 06 (Mimatic# 175241)|Y
01|162965|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|162965|2|2|1 output spindle.|Y
01|162986|11|1|**Coolant Ports|Y
01|162986|12|1|**Coolant Ports|Y
01|162986|13|1|*confirm Power Supply|Y
01|162991|1|1|Includes Haas Motors and Cables.|Y
01|162991|1|2|For 2013 HAAS VF-4 S/N #1106807|Y
01|163008|1|1|2 STOCK - 10 Due 09/30/2021|Y
01|163011|1|1|TAR-57329|Y
01|163011|1|2|CNCZ180LFA SN: 20271T|Y
01|163011|15|1|Replaces UE7510010|Y
01|163019|1|1|TAR-57329|Y
01|163019|1|2|CNCZ180LFA SN: 20272T|Y
01|163019|15|1|Replaces UE7510010|Y
01|163019|16|1|UE7510010|Y
01|163020|1|1|Tooling Certificate No: 25000-2966-051421RT|Y
01|163029|1|1|EJX16-8-60 Nikken Solid Carbide Bit|Y
01|163029|1|2|Quoted at NET price!|Y
01|163035|1|1|NCAT40-SF3-130CP - Larger OD at the nose|Y
01|163035|2|1|NCAT40-SF3-130CP - Larger OD at the nose|Y
01|163035|4|1|NCAT40-SF0187-5.12CP w/ Larger OD at the nose.|Y
01|163035|5|1|NCAT40-SF0187-5.12CP w/ Larger OD at the nose|Y
01|163036|3|1|E32-511AA|Y
01|163036|3|2|ER32 Collet 13.0mm AA Grade|Y
01|163036|4|1|AR32GB-M10|Y
01|163036|5|1|E32-157AA|Y
01|163036|5|2|ER32 Collet 4.0mm AA Grade|Y
01|163036|6|1|E20-157AA|Y
01|163036|6|2|ER20 Collet 4.0mm AA Grade|Y
01|163036|7|1|E32-629AA|Y
01|163036|7|2|ER32 Collet 16.0mm AA Grade|Y
01|163046|1|1|NBT40-HC20-90|Y
01|163046|1|2|39.P5.043.008|Y
01|163046|2|1|NBT40-HC32-110|Y
01|163046|2|2|39.P5.043.010|Y
01|163046|3|1|NBT40-HC12-90|Y
01|163046|3|2|39.P5.043.004|Y
01|163046|4|1|NBT40-HC20-90|Y
01|163046|4|2|39.P5.043.008|Y
01|163046|5|1|NBT40-HC20-90|Y
01|163046|5|2|39.P5.043.008|Y
01|163046|6|1|NBT40-HC10-90|Y
01|163046|6|2|39.P5.043.003|Y
01|163054|1|1|Tooling Certificate Number:13687-2894-030821|Y
01|163063|1|1|Need to order Pull Stud with this item|Y
01|163063|1|2|Please advise machine make and model|Y
01|163064|5|1|C4006-1000-4.00-DIN-M|Y
01|163064|6|1|C4006-0750-3.00-DIN-M|Y
01|163064|7|1|C4006-0500-2.50-DIN-M|Y
01|163064|8|1|C4006-0500-4.00-DIN-M|Y
01|163064|9|1|C4006-0375-4.00-DIN-M|Y
01|163064|10|1|C4006-0250-2.50-DIN-M|Y
01|163064|11|1|C4006-0250-4.00-DIN-M|Y
01|163064|12|1|C4006-0125-2.36-DIN-M|Y
01|163064|13|1|C4006-0125-4.00-DIN-M|Y
01|163064|14|1|C4006-0187-4.00-DIN-M|Y
01|163067|1|1|Items are due 8/25 but shipments have been late|Y
01|163085|1|1|This item is considered special once ordered cannot|Y
01|163085|1|2|be canceled or returned.|Y
01|163110|3|1|Cable Set|Y
01|163126|1|1|Warranty per Tim Reeves: 1 year manufacturer defects|Y
01|163126|1|2|and workmanship.|Y
01|163126|1|3|Used tool approved by Robert Galvin at Waters.|Y
01|163135|1|1|5AX-200TD-W-OSP4|Y
01|163139|1|1|Air Brake Style|Y
01|163139|2|1|Installation on YCM NSV106|Y
01|163139|2|2|Includes Hardware Tech Travel Time/Labor/Expenses|Y
01|163139|2|3|** Does not include software or ladder changes if|Y
01|163139|2|4|Necessary **|Y
01|163155|2|1|This item is quoted as NET price. Delivery is based|Y
01|163155|2|2|upon receipt of order after customer has received the|Y
01|163155|2|3|C50FHM-ER32-215IC-110TP. Tim Reeves will work with|Y
01|163155|2|4|end user to make the positioning block.|Y
01|163160|1|1|Installed with PS-N46E pull studs at factory|Y
01|163160|2|1|Installed on NC5-46-SK16C-120 at factory|Y
01|163167|2|1|NET price no additional discount|Y
01|163167|2|2|ETA pending customer provided specs|Y
01|163181|3|1|We currently have stock on B3006-0500-2.50B if they|Y
01|163181|3|2|will consider the 2.50 gage length.|Y
01|163181|3|3|Price upon request.|Y
01|163181|5|1|We currently have stock on B3006-0375B if they can use|Y
01|163181|5|2|a 2.0 gage length. Price upon request.|Y
01|163194|1|1|HSK100A-SK25C-300 HSK100A SK25 Slim Chuck Coolant|Y
01|163194|1|2|10000 RPM|Y
01|163208|5|1|Pull studs should also be purchased together.|Y
01|163208|6|1|Pull studs should also be purchased together.|Y
01|163208|7|1|Pull studs should also be purchased together.|Y
01|163209|1|1|Rotary Joint Sleeve Anti Rotation Bracket Hardware|Y
01|163209|1|2|and etc. for SP R/Joint (Pls Reffer to QT# 162815)|Y
01|163214|1|1|Reference RGA# LVR-57338|Y
01|163214|1|2|Repair of OKL3-ER32X s/n: AL1249 (Alps# OK101-14000)|Y
01|163214|2|1|Bearings. o-rings collet nut Clutch and spindle to be|Y
01|163214|2|2|replaced.If the spindle can be reused the cost will be|Y
01|163214|2|3|$1190.40|Y
01|163214|4|1|Repair of OKL3-ER32X s/n: AL1262 (Alps# OK101-14000)|Y
01|163214|5|1|Bearings. o-rings collet nut Clutch and spindle to be|Y
01|163214|5|2|removed. If the spindle can be reused the cost will be|Y
01|163214|5|3|$1190.40|Y
01|163214|7|1|Repair of OK101-79000 s/n: AL004|Y
01|163214|8|1|Bearings o-rings clutch nuts and spindle to be|Y
01|163214|8|2|replaced.If the spindle can be reused the cost will be|Y
01|163214|8|3|$2930.80|Y
01|163214|10|1|Repair of OK101-79000 s/n: AL0009|Y
01|163214|11|1|Bearings o-rings clutch nuts and spindle to be|Y
01|163214|11|2|replaced.If the spindle can be reused the cost will be|Y
01|163214|11|3|$2930.80|Y
01|163225|4|1|Wrench for SK20 series holders|Y
01|163225|7|1|Shorter length|Y
01|163225|8|1|Collet range is 2.75mm-16.00mm (.108-.630)|Y
01|163225|9|1|Collet size range 16mm-25.4mm (.630-1.00)|Y
01|163227|1|1|CAT50-C32-250|Y
01|163227|2|1|CAT50-C32-300|Y
01|163227|3|1|32mm Milling Chuck / Direct chucking can be achieved|Y
01|163227|3|2|using your 1.1/4 cutting tool.|Y
01|163227|3|3|Please refer to following KM collets for 3/4 & 1''|Y
01|163227|3|4|cutting tools and sleeve down for use.|Y
01|163230|1|1|Arbor Screw to be substituted w/ Slotted Screw for|Y
01|163230|1|2|Coolant Through capabilities prior to shipping.|Y
01|163230|2|1|FM10 Arbor Screw to be Slotted for Coolant Through|Y
01|163240|1|1|Repair TAR-57165|Y
01|163240|1|2|CNCZ180LSA3 SN: 10081 is not repairable|Y
01|163240|1|3|TAT-105 sent in with table is also not repairable|Y
01|163240|1|4|Inspection fees are below for both evaluations|Y
01|163251|10|1|Quoted at NET price|Y
01|163260|46|1|This item is special cannot be cancelled or returned|Y
01|163262|1|1|1st Batch/#ER11-AT|Y
01|163262|2|1|1st Batch/for stock 2/24 approved by Andrew|Y
01|163262|3|1|1st Batch/CBO 4/12/21:DWG Approved/TR/Email|Y
01|163262|4|1|1st Batch/CBO 4/12/21:DWG Approved/TR/Email|Y
01|163277|1|1|Our Factory can hold 1p for us until Tue 8/31.|Y
01|163277|1|2|If PTS does not order by then it will go to the next|Y
01|163277|1|3|customer. Please issue PO asap|Y
01|163277|1|4|If the customer needs soonerwe can arrange a drop ship|Y
01|163277|1|5|using PTS's FedEx or DHL acct#|Y
01|163277|1|6|***Est weight of this rotary cylinder is 25~30 lbs.****|Y
01|163296|2|1|Include Drive for booth Axis and Labor on site|Y
01|163296|2|2|Include al hardware necessary for the Rotary|Y
01|163296|2|5|e|N
01|163299|1|1|SP Cable Cover for  CNC202 (S/N 25141TF)|Y
01|163299|1|2|Width 80mm  Powder Color Black|Y
01|163299|2|1|TCE-95945-3150R Power Cable|Y
01|163299|2|2|TCE-95949-3150R Feedback Cable|Y
01|163311|1|1|Includes rust proof treatment.|Y
01|163321|1|1|Plastic flexible conduit cables|Y
01|163321|2|1|Conductor|Y
01|163326|1|1|Include External Cables|Y
01|163329|1|1|1 Month to Manufacture - up to 5 pieces|Y
01|163329|2|1|2 months to Manufacture|Y
01|163329|3|1|Stock in Japan|Y
01|163329|4|1|2 Months to Manufacture|Y
01|163337|1|1|TAR-57050|Y
01|163337|1|2|5AX-201FA-M SN: N/A - No Serial tag|Y
01|163337|1|3|Customer sending in for eval and conversion to|Y
01|163337|1|4|DMG Mori CMX Machine|Y
01|163337|31|1|AX204R030 Rotary Axis Cover|Y
01|163339|1|1|ICE Units can run dry external coolant or internal|Y
01|163339|1|2|coolant.|Y
01|163339|1|3|note: do not run AIR only as it will damage seal system|Y
01|163339|2|1|BMT75-ER40Z|Y
01|163339|2|2|ExtCoolant 90-degree|Y
01|163343|1|1|Tooling Certificate Number:13700TA-3023-072921|Y
01|163356|1|1|Air Brake - This Price does not include cables|Y
01|163356|1|2|Will will need to know Machine Model to Spec Cables|Y
01|163361|1|1|P/N: IT40-C22C-90|Y
01|163361|1|2|IT40/SK40 Taper 22mm Milling Chuck with 90mm projection|Y
01|163361|2|1|P/N: IT40-C22-120|Y
01|163361|2|2|IT40/SK40 22mm Milling Chuck w 120mm projection|Y
01|163361|7|1|P/N: IT40-SK10-120|Y
01|163361|7|2|IT40/SK40 SK slim Chuck w 120mm gage length|Y
01|163391|1|1|4 in stock at factory - ETA for those 3 weeks ARO|Y
01|163391|1|2|remaining 6 pieces ETA is 24-27 WEEKS ARO|Y
01|163402|25|1|One year standard Warranty on 10DER & ROBOT|Y
01|163418|5|1|Pull studs should also be purchased together.|Y
01|163418|6|1|Pull studs should also be purchased together.|Y
01|163418|7|1|Pull studs should also be purchased together.|Y
01|163420|1|1|Motor Cover Modification Fee|Y
01|163420|1|2|Pull the cable out from the Face Plate Side.|Y
01|163420|1|3|CNC180FA S/N 15544   RGA#: TAR-57367|Y
01|163424|2|1|Wrench for ER32 holder|Y
01|163424|4|1|Wrench for ER16 Holder|Y
01|163424|9|1|See attached drawing to confirm dimensions|Y
01|163428|4|1|Version Economica de contrapunto|Y
01|163428|5|1|Interface FanucIncluye mano de obra|Y
01|163428|8|1|Instalacion mismo costo de CNC302FA-M|Y
01|163432|1|1|Tooling Certificate Number to Be Determined|Y
01|163452|1|1|Custom HMI work to include:|Y
01|163452|1|2|1.Password protect the part list screen|Y
01|163452|1|3|2.Shelf data screen load part button operation|Y
01|163452|1|4|3.Shelf data screen scan operation button|Y
01|163452|1|5|4.Part list screen operation|Y
01|163464|1|1|HSK40A-HC12-90 >> HSK40A Hydraulic Holder 12mm X 90mm|Y
01|163464|1|2|gage length.|Y
01|163464|1|3|Quoted at NET price.|Y
01|163481|1|1|Quoted at NET pricing.|Y
01|163486|1|1|Reference RGA# LVR-57218|Y
01|163486|1|2|Repair of MNL12-ER32Z-MS-10K s/n: A0015|Y
01|163486|1|3|(Alps# MSA01-3W000)|Y
01|163486|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|163486|2|2|replaced.|Y
01|163486|4|1|Repair of MNL12-ER32Z-MS-10K s/n: A0018|Y
01|163486|4|2|(Alps# MSA01-3W000)|Y
01|163486|5|1|Bearings o-rings collet nuts and spindle to be|Y
01|163486|5|2|replaced.|Y
01|163486|7|1|Repair of MNL12-ER32Z-MS-10K s/n: A0019|Y
01|163486|7|2|(Alps# MSA01-3W000)|Y
01|163486|8|1|Bearings o-rings collet nuts and spindle to be|Y
01|163486|8|2|replaced.|Y
01|163486|10|1|Repair of MNL12-ER32Z-MS-10K s/n: A0044|Y
01|163486|10|2|(Alps# MSA01-3W000)|Y
01|163486|11|1|Bearings o-rings collet nuts and spindle to be|Y
01|163486|11|2|replaced.|Y
01|163486|13|1|Repair of MNL12-ER32Z-10K s/n: A0022(Alps# MSA01-4R000)|Y
01|163486|14|1|Bearings o-rings collet nuts and spindle to be|Y
01|163486|14|2|replaced.|Y
01|163487|5|1|Chuck no Nikken|Y
01|163496|6|1|SK13 for pricing only|Y
01|163512|2|1|MBT40-ZMAC70-165V|Y
01|163512|2|2|3Lock BT40 ZMAC Boring Bar Advanced|Y
01|163512|2|3|Triangular Insert Type Head|Y
01|163512|3|1|MBT40-ZMAC70R-165V|Y
01|163512|3|2|3Lock BT40 ZMAC Boring Bar Advanced|Y
01|163512|3|3|Rhomboid Insert Type Head|Y
01|163512|7|1|Triangular Insert Type|Y
01|163512|8|1|Rhomboid Insert Type|Y
01|163521|1|1|Replaces discontinued part #SKN-6WB|Y
01|163521|2|1|Replaces discontinued part #SKN-10B|Y
01|163539|5|1|Gives reach of 10.62|Y
01|163539|6|1|Gives reach of 9.44|Y
01|163545|3|1|Part# TBD|Y
01|163545|3|2|Okuma ER16 Adjustable Angle Tool pinned at 30 degrees|Y
01|163545|3|3|per supplied drawing. VDI30 for Okuma Drive.|Y
01|163545|3|4|ICE version Int/Ext Coolant can also be run dry.|Y
01|163545|3|5|*concept drawing only at this time: 192499|Y
01|163549|39|1|**Used for #10 tap and also US tap 3/16|Y
01|163565|2|1|Wrench for ER32 holder|Y
01|163582|1|1|Tooling Certificate Number: 13687-3031-081221|Y
01|163584|3|1|Includes: Drive unit shor tbar fiber optic cables|Y
01|163584|3|2|communications cables bulkhead cables external|Y
01|163584|3|3|cable paremter changes service time and travel.|Y
01|163585|1|1|CCK42-3/8|Y
01|163585|1|2|CCK42 coolant collet ID3/8|Y
01|163585|1|3|*NET price|Y
01|163585|2|1|part# CKFN42-3/8C|Y
01|163585|2|2|CCK Coolant Seal Nut/Cap OD42mm ID3/8|Y
01|163585|2|3|*NET price|Y
01|163590|3|1|Quoted as an in stock option to above part #|Y
01|163597|1|1|Tooling Certificate Number: 5410-2963-051221|Y
01|163602|1|1|Project for USA with TCA71046 and AYO 200AIR booster|N
01|163603|1|1|For ELBO Controlli Larth s/n: 8213|Y
01|163605|1|1|1st Batch/SP 880514 L&M/JRB|Y
01|163612|17|1|Note: Quoted at one time NET pricing to sub for ER32|Y
01|163615|1|1|Direct replacement to C4011-1000-4.00|Y
01|163641|3|1|part # C5026-0500-6.00 will soon be changed to this|Y
01|163663|5|1|External Cable Set|Y
01|163663|6|1|Interface Cable Set|Y
01|163666|1|1|P/N: TBD|Y
01|163666|1|2|CAT40;ER32 x 4 Output; Pitch O104.14mm; 1:1 Gear;|Y
01|163666|1|3|Max 4000 RPM; Ext Coolant Ref Drwg: 00058734/00036438|Y
01|163666|1|4|wrenches not included|Y
01|163666|1|5|#112900|Y
01|163666|1|6|#107642|Y
01|163666|3|1|P/N: TBD|Y
01|163666|3|2|CAT40; MI50x 4 Output; Pitch O104.14mm; 1:1 Gear;|Y
01|163666|3|3|Max 4000 RPM; External Coolant|Y
01|163666|3|4|MI Wrenches Included|Y
01|163666|3|5|MI Attachments Not Included|Y
01|163708|1|1|Custom-made special hard jaws (H01MA15) 1 set (=3p)|Y
01|163731|1|1|Reference RGA# LVR-57375|Y
01|163731|1|2|Repair of MZQT47-ER32Z-MS s/n: 76328-02|Y
01|163731|1|3|(Mimatic# 124638)|Y
01|163731|2|1|Bearings seals and o-rings to be replaced.|Y
01|163758|1|1|KM32-14.75 / Non-Cancelable or Returnable|Y
01|163758|3|1|KM32-6.8 Non-Cancelable or Returnable|Y
01|163764|2|1|Both items are non standard stock that are non cancelab|Y
01|163764|2|2|nor returnable.|Y
01|163764|2|3|Prices are NET ea price|Y
01|163776|7|1|In-Stock Shorter G.L. for Delivery Delay line#5?|Y
01|163779|8|1|**Bearing Nut style|Y
01|163780|1|1|s/n.13941  w/o Direct mount Cable and Motor|Y
01|163780|3|1|TCD-C4549|Y
01|163780|3|2|10+1p Rortaty Joint Built-In for CNC260FA S/N 13941|Y
01|163809|1|1|CAT40; ER32 x4 OUTPUT: PITCH O104.14mm: 1/1 GEAR|Y
01|163809|1|2|MAX 4000 RPM: EXT COOLANT|Y
01|163809|1|3|Wrenches sold seperatley|Y
01|163809|2|1|CAT40; ER32 x4 OUTPUT: PITCH O104.14mm: 1/1 GEAR|Y
01|163809|2|2|MAX 4000 RPM: EXT COOLANT|Y
01|163809|2|3|Wrenches sold seperatley|Y
01|163809|5|1|CAT40; MI50 x4 OUTPUT: PITCH O104.14mm: 1/1 GEAR:|Y
01|163809|5|2|MAX 4000 RPM: EXT COOLANT|Y
01|163809|5|3|Wrenches Included|Y
01|163809|6|1|CAT40; MI50 x4 OUTPUT: PITCH O104.14mm: 1/1 GEAR:|Y
01|163809|6|2|MAX 4000 RPM: EXT COOLANT|Y
01|163809|6|3|Wrenches Included|Y
01|163814|42|1|ESTIMATE - REPLACEMENT TILT AXIS BODY CASTING|Y
01|163816|1|1|Part # 5AX-350FA-RJ6|Y
01|163816|1|2|Replacement SN 3546|Y
01|163816|1|3|Table + Motors + Rotary Joint + Baseplate for Ship|Y
01|163821|1|1|NMTB50 NX5 Spindle speeder|Y
01|163826|3|1|AX302R010|Y
01|163826|4|1|AX302R011|Y
01|163832|1|1|Req.INS/884732/736/738 Trinity Mill/GKN-NY|Y
01|163832|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|163832|3|1|1st Batch/Install E16-NUT & ER16-SCREW(C)|Y
01|163832|4|1|1st Batch/(2)887804 MSC/Aerojet 7/20/21:DWG Approved/BT|Y
01|163832|5|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|163832|6|1|Req.INS/Install E25-NUT & ER25-SCREW (10)CBO|Y
01|163832|7|1|1st Batch/(2)887804 MSC/Aerojet 7/20/21:DWG Approved/BT|Y
01|163852|3|1|Item is non cancelable nor returnable once order is|Y
01|163852|3|2|placed to the factory|Y
01|163865|5|1|Need Spindle Drwaing For each machine|Y
01|163865|5|2|For Mounted on Magazine need Check Magazine Wall|Y
01|163871|2|1|This item is considered special and cannot be cancelled|Y
01|163871|2|2|or returned.|Y
01|163874|19|1|Above represents 2 different Gage Lengths for the|Y
01|163874|19|2|CAT40 1 shell mill|Y
01|163878|1|1|part# CAT40-ER16-2.76BN-DIN-M|Y
01|163878|1|2|CAT40 ER16 Collet Chuck with 2.76 GL DIN|Y
01|163878|2|1|part# CAT40-ER16-4.00BN-DIN-M|Y
01|163878|2|2|CAT40 ER16 Collet Chuck with 4.00 GL DIN|Y
01|163880|2|1|Alternative for N4007-0025-2.00|Y
01|163880|2|2|Does not work on ERICKSON Quick Change|Y
01|163887|1|1|Replacement Table/Mechanical/Casting Portion|Y
01|163887|1|2|Will re-use motor and electrical components.|Y
01|163887|1|3|per TAR-57351 SN: 9260C|Y
01|163888|6|1|Sup-Plate for Manual Tailstocks|Y
01|163890|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|163893|1|1|Quoted at NET pricing.|Y
01|163893|3|1|Quoted at NET pricing.|Y
01|163895|3|1|Special order non-cancelable non returnable after|Y
01|163895|3|2|receipt of order|Y
01|163900|1|1|NMTB50-NX5-153  NMTB50 SK10 Spindle Speeder|Y
01|163900|1|2|Wrenches Included|Y
01|163900|1|3|Quoted at NET price.|Y
01|163900|2|1|T50U-NX5-12253  NMTB50 SK10 Spindle Speeder|Y
01|163900|2|2|Wrenches Included|Y
01|163900|2|3|Quoted at NET price.|Y
01|163903|3|1|Special order non-cancelable non returnable after|Y
01|163903|3|2|receipt of order|Y
01|163917|3|1|Interface + Hand labor on Site|Y
01|163917|6|1|Installation on Okuma Howa Machine|Y
01|163918|2|1|Fanuc Interface|Y
01|163919|1|1|NSVZ300 SN: 2219H|Y
01|163919|1|2|TAR-57369|Y
01|163919|34|1|Part # NV301R017|Y
01|163919|37|1|TAT-250|Y
01|163919|37|2|TAR-57369|Y
01|163934|1|1|TAR-57307|Y
01|163934|1|2|5AX-201 SN:4189|Y
01|163934|28|1|Replaces BE3908E01X2|Y
01|163934|29|1|Replaces WP-13|Y
01|163934|37|1|Replaces NIK-1555-300|Y
01|163935|5|1|Installation includes:Dual axis drive unit short bar|Y
01|163935|5|2|fiber optic cables communications cables bulkhead|Y
01|163935|5|3|cables external cablesparameter changes service|Y
01|163935|5|4|time and travel.|Y
01|163942|1|1|Nonstandard stk item non cancelable nor returnable once|Y
01|163942|1|2|orderis placed to our factory|Y
01|163952|1|1|Sumitomo Part # CT40-22SMH|Y
01|163968|1|1|1st Batch|Y
01|163972|2|1|Included with purchase of START2-UNIT|Y
01|163981|1|1|X2 Sets of cables/junction box/center divider|Y
01|163981|1|2|for TC-32BN|Y
01|163981|1|3|Includes: Junction Box + JBOX Cable + Center Divider|Y
01|163981|1|4|1 Set can ship 2nd set will be around 4-6 weeks|Y
01|163984|1|1|HSK63A-MMC4-116-AA|Y
01|163984|1|2|HSK63A Mini Mini Chuck 30000 RPM  Coolant Thru|Y
01|163984|1|3|Collet Range >> 1~4mm|Y
01|163986|1|1|1st Batch *6/21/21:DWG in TEAMS Log|Y
01|163986|2|1|1st Batch *DWG Saved in TEAMS|Y
01|163986|3|1|1st Batch *DWG Saved in TEAMS|Y
01|163987|1|1|Tim:Remove SK10 collets & Switch manuals|Y
01|163987|1|2|NIKKEN BOAT #LY-2352 SN#SN:PDOE-018~022|Y
01|163988|3|1|Offset type|Y
01|163988|6|1|Offset type|Y
01|163988|10|1|Offset type|Y
01|163988|13|1|Offset type|Y
01|163996|3|1|Wrench for STH32-SK16-120|Y
01|163996|4|1|Wrench for LCH32-SZF16S-55-A|Y
01|163996|5|1|Wrench for LCH32-SZF16S-55-A|Y
01|163996|6|1|Wrench for LCH32-SZF16S-55-A|Y
01|164005|1|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|2|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|3|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|4|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|5|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|6|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|7|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|8|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|9|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|10|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|11|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|12|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|13|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|14|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|15|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|16|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|17|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|18|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|19|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|20|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|21|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|22|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|23|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|24|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|25|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|26|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|27|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|28|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|29|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|30|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|31|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|32|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|33|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|34|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|35|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|36|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|37|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|38|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|39|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|40|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|41|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|42|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|43|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|44|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|45|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|46|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164005|47|1|Ref.I#212446 Missing Shipment/Delivered wrong location|Y
01|164016|2|1|Service includes: Connecting/wiring & testing system.|Y
01|164016|2|3|** M-code options must be enabled prior to arrival **|Y
01|164027|3|1|This item is special once a purchase order is placed|Y
01|164027|3|2|it cannot be cancelled or returned.|Y
01|164036|12|1|Non-Dual Contact Holder for pricing|Y
01|164036|13|1|Non-Dual Contact Holder for pricing|Y
01|164042|12|1|Non-Dual Contact Holder for pricing|Y
01|164042|13|1|Non-Dual Contact Holder for pricing|Y
01|164043|1|1|TAR-57379|Y
01|164043|1|2|CNC250LF SN: 2938|Y
01|164043|13|1|Replaces 51105|Y
01|164044|1|1|TAR-57343|Y
01|164044|1|2|5AX-130YA SN: 5953|Y
01|164044|1|3|ROTARY AXIS OK - Tilting Axis Needs Repair due to tool|Y
01|164044|1|4|Crash - Bearings/Seals/Brake/Worm Wheel/Screw|Y
01|164049|3|1|Please Note: This back up screw is already included|Y
01|164049|3|2|with HSK63A-ER16S-100 tool holder.|Y
01|164054|1|1|Motor Model#: HG-154T-D51|Y
01|164064|1|1|MISSING 5/16 & 15/32 BOTH DUE ON 9/15|Y
01|164071|1|1|They are looking for 10-15 pcs|Y
01|164075|2|1|RNC 8380 +/- 2 Big Bore Scale with Mounting Kit|Y
01|164075|3|1|NT50 Taper Center Socket|Y
01|164075|4|1|Hydraulic Cylinder and Adapter for NT50 Socket|Y
01|164075|5|1|Power and Signal/Feedback Cable Set|Y
01|164075|6|1|Manual Lever Valve for Tailstock 2000 PSI|Y
01|164075|7|1|Hydraulic Hose Set|Y
01|164075|8|1|Special Hydraulic Tailstock per Customer|Y
01|164075|8|2|Drawing 500152-T-1SHT1 Rev Level B|Y
01|164075|9|1|Onsite Technican to facilitate Tailstock and|Y
01|164075|9|2|Rotary table setup.|Y
01|164092|3|1|Installation includes: Drive unit short bar fiber|Y
01|164092|3|2|optic cable communications cable bulkhead cables|Y
01|164092|3|3|external cables parmeter changes service time and|Y
01|164092|3|4|travel.|Y
01|164095|15|1|***WE ONLY OFFER COOLANT SEALED***|Y
01|164095|19|1|***WE ONLY OFFER COOLANT SEALED***|Y
01|164108|1|1|Tooling Certificate Number: 8115-2957-050421|Y
01|164109|1|1|Needs torque control. On QF for P & D|Y
01|164139|1|1|5AX-4MT-NC5/85S-152.4FA|Y
01|164139|1|2|SN: 1172|Y
01|164139|1|3|TAR-56582|Y
01|164139|3|1|Parts Cost|Y
01|164139|3|2|Bearings/Seals/Worm Wheel/Worm Screw|Y
01|164139|3|3|Fixture Parts|Y
01|164139|3|4|Table needs full rebuild|Y
01|164139|4|1|Paint/Plating some parts + Packaging Fee|Y
01|164149|1|1|Reference RGA# LVR-57385|Y
01|164149|1|2|Repair of 1 x 2X785600-ER25 s/n: 2391203|Y
01|164149|1|3|(Mimatic# 123862)|Y
01|164149|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|164149|2|2|1 spindle.|Y
01|164155|1|1|No INS Needed.|Y
01|164155|1|2|BIRLA AIR 212270170|Y
01|164155|2|1|No INS Needed.|N
01|164155|2|2|BIRLA AIR 212270170|N
01|164155|3|1|No INS Needed.|Y
01|164155|3|2|BIRLA AIR 212270170|N
01|164160|4|1|Canada Live Tooling Promotion Extra 5% added to|Y
01|164160|4|2|discount on this quote.|Y
01|164187|1|1|1st batch(ScrewOnKey)|Y
01|164187|2|1|1st Batch|Y
01|164187|3|1|1st Batch|Y
01|164187|4|1|1st Batch|Y
01|164197|1|1|Includes: Installation/Cables/Hardware/PRM/Travel&Labor|Y
01|164197|1|2|The included installation is for three RT's in one trip|Y
01|164197|1|3|Fanuc AiS8 for a CMX 1100|Y
01|164211|1|1|1ea on QF for lead|Y
01|164211|2|1|Non standard stock special considered non cancelable|Y
01|164211|2|2|nor returnable once order placed to factory|Y
01|164223|1|1|Standard 10der with supplied Pallet Drawings for|Y
01|164223|1|2|PSA to Mfg|Y
01|164230|1|1|P/N: 199471 Lyn TBD  HA40L-MI50X-GR2|Y
01|164230|1|2|Haas Live; VDI40 130.25mm LONG COUPLING; MI50; 90 DEG|Y
01|164230|1|3|2:1 GEAR; MAX 50Nm; MAX INPUT 6500RPM;|Y
01|164230|1|4|MAX OUTPUT 3250RPM; Ref Drwg: 00059540|Y
01|164230|1|5|For Haas ST40/45/55|Y
01|164230|3|1|P/N: 169768 Lyn TBD MI50 Quick Change|Y
01|164230|3|2|diameter 0.367 x 0.275  1/2|Y
01|164238|1|1|List Price for this unit is $170000.00|Y
01|164238|1|2|Discounted Selling Price for PSA is $150000.00|Y
01|164238|1|3|This includes 10der Unit with supplied drawings of|Y
01|164238|1|4|Pallets for PSA to MFG|Y
01|164279|1|1|In house modification for 2 DIN holes|Y
01|164279|1|2|Currently 2 pieces in stock|Y
01|164279|1|3|modification on avail stock is 5 days ARO|Y
01|164279|1|4|ETA if no avail stock at time of order: week of 10/11|Y
01|164318|1|1|Advised Phyliss to double check if they want rigid tap|Y
01|164318|1|2|or tension/compression tap collets|Y
01|164328|2|1|Dia. 6mm Ball Type|Y
01|164336|3|1|Please Note: 1 each comes with Pre-Setter at no charge.|Y
01|164336|9|1|Quoted at NET Price.|Y
01|164337|1|1|Mechanical Drawbar Clamping with Auto Rotation|Y
01|164337|1|2|Includes:FULL MOTORIZED CNC FUNCTION|Y
01|164337|10|1|Standard Installation Price of $1500.00 at no cost|Y
01|164339|1|1|1st Batch(after sample APRV)/886473/Tormach|Y
01|164342|1|1|No need to INS.|Y
01|164342|1|2|Cheersun AIR #09092101|Y
01|164342|2|1|No need to INS.|Y
01|164342|2|2|Cheersun AIR #09092101|Y
01|164344|1|1|Item is non standard stock item that is non cancelable|Y
01|164344|1|2|nor returnable once order is placed to the factory|Y
01|164344|2|1|BT40-AHC3/4-200-90 BT40 C3/4 Angle Head|Y
01|164344|2|2|Item is non standard stock item that is non cancelable|Y
01|164344|2|3|nor returnable once order is placed to the factory|Y
01|164344|3|1|NET price no addistional discount. Customer will need|Y
01|164344|3|2|to provide appropriate specs or choose to make their|Y
01|164344|3|3|own position block|Y
01|164348|1|1|Item is non standard stock item that is non cancelable|Y
01|164348|1|2|nor returnable once order is placed to the factory|Y
01|164348|2|1|BT40-AHC3/4-200-90 BT40 C3/4 Angle Head|Y
01|164348|2|2|Item is non standard stock item that is non cancelable|Y
01|164348|2|3|nor returnable once order is placed to the factory|Y
01|164348|3|1|NET price no addistional discount. Customer will need|Y
01|164348|3|2|to provide appropriate specs|Y
01|164351|1|1|Qty 2 SF-POT-#30 Taper Pots included|Y
01|164353|1|1|Item is non standard stock item that is non cancelable|Y
01|164353|1|2|nor returnable once order is placed to the factory|Y
01|164353|2|1|BT40-AHC3/4-200-90 BT40 C3/4 Angle Head|Y
01|164353|2|2|Item is non standard stock item that is non cancelable|Y
01|164353|2|3|nor returnable once order is placed to the factory|Y
01|164353|3|1|NET price no addistional discount. Customer will need|Y
01|164353|3|2|to provide appropriate specs or choose to make their|Y
01|164353|3|3|own position block|Y
01|164395|1|1|QTN300/350 Capto C5 H-mill|Y
01|164395|1|2|LYN part# MZQT5-CAPTO5Z-ICE|Y
01|164395|1|3|NET price|Y
01|164403|3|1|EDP03385|Y
01|164403|6|1|TC420-UNF5/16-C2-WW60AD|Y
01|164403|8|1|A3967-7.45|Y
01|164403|10|1|TC410-UNC8-C6-WY80AD|Y
01|164403|12|1|DC150-03-03.800A1-WJ30RE|Y
01|164403|14|1|DC150-03-04.763A1-WJ30RE|Y
01|164403|16|1|TOOL 01092|Y
01|164403|18|1|DC150-05-03.969A1-WJ30RE|Y
01|164403|20|1|DC150-03-03.100A1-WJ30RE|Y
01|164403|22|1|EDP03168|Y
01|164403|24|1|83854|Y
01|164403|25|1|EDP569299|Y
01|164403|28|1|DC150-03-05.000A1-WJ30RE|Y
01|164403|31|1|DC150-0315.875A1-WJ30RE|Y
01|164403|34|1|TC87158|Y
01|164403|37|1|28167|Y
01|164403|39|1|83436|Y
01|164403|41|1|01482|Y
01|164403|43|1|01197|Y
01|164403|45|1|DC150-05-04.400A1-WJ30RE|Y
01|164403|47|1|1294300|Y
01|164403|50|1|DC150-03-12.700A1-WJ30RE|Y
01|164403|52|1|TC410-UNC6-C6-WY80AD|Y
01|164403|54|1|DC150-03-03.175A1-WJ30RE|Y
01|164403|56|1|TC420.UNF10-C2-WW60AD|Y
01|164403|61|1|DC150-05-06.500A1-WJ30RE|Y
01|164403|63|1|EDP03394|Y
01|164403|65|1|82162|Y
01|164403|67|1|01197|Y
01|164403|70|1|TC87321|Y
01|164403|72|1|DC150-05-06.395A1-WJ30RE|Y
01|164403|74|1|DC150-08-03.000A1-WJ30TA|Y
01|164403|76|1|TC87154|Y
01|164403|79|1|TC87154|Y
01|164403|81|1|TC420.UNC1/4-C2-WW60AD|Y
01|164403|83|1|DC150-05-05.800A1-WJ30RE|Y
01|164403|85|1|DC150-05-06.200A1-WJ30RE|Y
01|164403|87|1|EDP03381|Y
01|164403|90|1|DC160-03-05.700A1-WJ30ET|Y
01|164403|92|1|EDP03341|Y
01|164403|94|1|DC160-03-06.400A1-WJ30ET|Y
01|164403|96|1|EDP77885|Y
01|164403|99|1|TC87830|Y
01|164403|101|1|EDP 03374|Y
01|164403|103|1|DC150-05-06.100A1-WJ30RE|Y
01|164403|105|1|DC150-03-07.800A1-WJ30RE|Y
01|164409|2|1|BT40-ZL24-160|Y
01|164409|3|1|BT40-ZL12-130|Y
01|164409|8|1|BT40-FMB40-60|Y
01|164409|10|1|BT40-FMC32-75|Y
01|164411|1|1|BT40-TP200|Y
01|164411|1|2|BT40 Touch Point / Edge Finder|Y
01|164415|1|1|*Not for Erickson Quick Change|Y
01|164433|1|1|Substitute: B3007-0008-2.00 in stock $170.00 list|Y
01|164433|22|1|Alternative to NBT30-MMC8C-105-AA|Y
01|164436|1|1|Part#NC5-46-BLK40-100 will be created upon receipt of|Y
01|164436|1|2|order and invoiced accordingly.|Y
01|164436|1|3|Material: JIS SNCM616|Y
01|164436|1|4|Hardness: HRC41-45 (from surface to core)|Y
01|164436|1|5|***Copy of signed approval drawing required at time of|Y
01|164436|1|6|order***|Y
01|164436|2|1|***NET Pricing QTY 1~9pcs.***|Y
01|164436|4|1|***NET Pricing QTY 10~19pcs.***|Y
01|164436|6|1|***NET Pricing QTY 20+pcs.***|Y
01|164438|1|1|part# HSK100A-0500A-6.60|Y
01|164438|1|2|HSK100A 1/2 End Mill Holder w/ 6.60 gage length|Y
01|164438|1|3|Aerospace - 5-degree whistle notch|Y
01|164438|1|4|SPECIAL NONCANCELABLE/NONRETURNABLE AFTER RECEIPT OF PO|Y
01|164446|1|1|Tooling Certificate will have a face value of $16500|Y
01|164446|1|2|Net Price to Productivity will be $8250 meaning a 50%|Y
01|164446|1|3|discount from list.|Y
01|164447|1|1|*standard - blank draw nut|Y
01|164447|1|2|**Additional charge/modification to thread nut|Y
01|164447|2|1|**This is the additional charge (NET price) to thread|Y
01|164447|2|2|blank draw nut on QCC-DL65-A6|Y
01|164449|2|1|Stock Subject to prior sale. Ship 2to3 weeks A.R.O|Y
01|164449|4|1|Stock Subject to Prior Sale|Y
01|164449|5|1|Stock subject to prior sale. 2-3 Wk. Delivery ARO|Y
01|164450|9|1|Replaces SKN-10B|Y
01|164455|3|1|HSK50 (HSK63F) SPINDLE|Y
01|164455|7|1|USED TO MASTER THE HSK50 (HSK63F) SPINDLE|Y
01|164468|2|1|*Not for Erikson quick change|Y
01|164469|7|1|only available in 2.50 moving foward|Y
01|164470|2|1|HSK50 (HSK63F) SPINDLE|Y
01|164470|7|1|USED TO MASTER THE HSK50 (HSK63F) SPINDLE|Y
01|164483|1|1|CAT50-ER16-6.00BN  CAT50 ER16 Collet Chuck with|Y
01|164483|1|2|bearing nut installed.|Y
01|164487|1|1|**No Makino Drive Pin Option**|Y
01|164487|3|1|part# HSK63F/LPM-C1.1/4-110G|Y
01|164487|3|2|HSK63F 1.1/4 Milling Chuck High Speed|Y
01|164487|3|3|***with Makino/Drive Pins***|Y
01|164487|3|4|**Special: Non-returnable and non-cancellable|Y
01|164487|3|5|**NET price|Y
01|164492|1|1|1st Batch|Y
01|164492|2|1|1st Btach|Y
01|164492|3|1|1st Batch|Y
01|164492|4|1|1st Batch|Y
01|164492|5|1|1st Batch|Y
01|164492|6|1|1st Batch|Y
01|164492|7|1|1st Batch|Y
01|164492|8|1|1st Batch|Y
01|164492|9|1|1st Batch|Y
01|164492|10|1|1st Batch|Y
01|164494|1|1|Tooling Certificate Number:|Y
01|164514|1|1|Machine arrives in 6 weekswill install w/in 8weeks|Y
01|164514|2|1|Factory has 19ea in stock|Y
01|164529|1|1|for page 1 - 2|Y
01|164530|2|1|Wrench for holder above|Y
01|164530|5|1|In stock standard contact non dual contact|Y
01|164530|7|1|In stock standard contact Not a dual contact version|Y
01|164530|13|1|In stock solid nut version|Y
01|164530|15|1|In stock size|Y
01|164540|1|1|TAR-57367|Y
01|164540|1|2|CNC180FA SN: 15544|Y
01|164548|1|1|Reference RGA# LVR-57403|Y
01|164548|1|2|Repair of BMT65-ER32Z-MS s/n: 7683606 (Mimatic# 186493)|Y
01|164548|2|1|Bearings seals and o-rings to be replaced.|Y
01|164554|4|1|NB3006-0187-2.36CP Taper Plus  BT30 End Mill Holder|Y
01|164554|4|2|3/16 Coolant Ports|Y
01|164554|6|1|NB3006-0312-2.36CP Taper Plus  BT30 End Mill Holder|Y
01|164554|6|2|5/16 Coolant Ports|Y
01|164554|9|1|NB3006-0625-2.50CP Taper Plus BT30 End Mill Holder 5/8|Y
01|164554|9|2|Coolant Ports|Y
01|164554|10|1|NB3006-0750-3.00CP Taper Plus End Mill Holder 3/4|Y
01|164554|10|2|Coolant Ports|Y
01|164559|35|1|***RFQ Line#39 Part#E32-236(C) Does not exist***|Y
01|164560|14|1|Pilot DIAMETER IS .77 NOT .82|Y
01|164560|16|1|milling chuck is GTO|Y
01|164572|2|1|Substitute for out of stock bearing nut version|Y
01|164574|1|1|We will need to know if PSA would like the face plate|Y
01|164574|1|2|with T slots or Bolt holes|Y
01|164574|2|1|Power & Feedback Cables from Rotary to Machine|Y
01|164574|2|2|Bulkhead|Y
01|164574|4|1|12 Month extended warranty - Parts only does not|Y
01|164574|4|2|include Haas Servo Motor or Cables to bulkhead|Y
01|164574|4|3|Free on this Purchase Order|Y
01|164591|1|1|9HA30|Y
01|164591|1|2|Spanner Wrench|Y
01|164592|39|1|**Used for #10 tap and also US tap 3/16|Y
01|164597|4|1|In stock substiture|Y
01|164597|6|1|In stock substitute|Y
01|164598|3|1|Interface Kit -Includes Amp & Cable Set|Y
01|164606|9|1|MZMP46-ER32Z-SUB|Y
01|164610|4|1|Hydraulic Optional for 5AX-201 - Same HYD-Unit|Y
01|164613|5|1|replaces SKN-10BJ|Y
01|164613|8|1|replaces SKN-10BJ|Y
01|164613|11|1|replaces SKN-6WBJ|Y
01|164618|3|1|in stock option|Y
01|164646|1|1|Wrench for VC6 Holders|Y
01|164646|2|1|Wrench for C1 Holder|Y
01|164656|2|1|Quoted at NET price and onc a purchase order is placed|Y
01|164656|2|2|it cannot be cancelled or returned|Y
01|164709|1|1|**Option 1**|Y
01|164709|3|1|**Option 2**|Y
01|164714|1|1|***Special Pricing*** Standard Dicsount 35%|Y
01|164714|2|1|***Special Pricing*** Standard Dicsount 35%|Y
01|164718|2|1|***Used Tool must be inspected for any cosmetic or|Y
01|164718|2|2|tell tell flaws***|Y
01|164718|4|1|*We can ship partial or ship complete. x1 collet|Y
01|164718|4|2|missing from the set size 3/8|Y
01|164718|5|1|*We can ship partial or ship complete. x1 collet|Y
01|164718|5|2|missing from the set size 1.1/8|Y
01|164719|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|164721|1|1|300mm RT w/ Haas Motor & Cable Set|Y
01|164721|8|1|Includes Table Installation Parameter Changes Service|Y
01|164721|8|2|Time & Travel|Y
01|164721|10|1|Riser Plates for TAT-250(40mm) & CNC302 (20mm)|Y
01|164730|1|1|Special Discount for used tool ok per Dan Rocheleau.|Y
01|164730|1|2|This tool has a 1 year parts & labor warranty.|Y
01|164730|1|3|This tool is non-returnable. Pictures were sent to|Y
01|164730|1|4|Dan.|Y
01|164734|3|1|2 items above are instock option. Can either just order|Y
01|164734|3|2|the solid nut holder or order the solid nut holder and|Y
01|164734|3|3|bearing nuts to make switch on customer site|Y
01|164743|1|1|HSK63A-HC06-150|Y
01|164743|1|2|HSK63A Hydraulic Chuck 6mm 150GL|Y
01|164754|4|1|see notes:|Y
01|164761|3|1|***Freebie One-time***|Y
01|164761|7|1|***Freebie One-time***|Y
01|164762|1|1|External Cables included: x2 32-1990|Y
01|164763|2|1|In stock option has solid nut|Y
01|164763|3|1|This bearing nut can be ordered and swapped out with|Y
01|164763|3|2|the solid nut if customer wants bearing nut holder|Y
01|164779|1|1|UNV_5149 .375 dia Shrink fit 5.00 GL|Y
01|164779|1|2|Lyndex Part # CAT50-SF0375-5.00-IDKS|Y
01|164791|1|1|CAT50-C1.1/4-105U-IDU-MH|Y
01|164791|1|2|Non-cancellable non-returnable after receipt of PO|Y
01|164791|1|3|ETA 3-5 days ARO|Y
01|164791|5|1|CAT50-C1.1/4-135U-IDU-MH|Y
01|164791|5|2|CAT50 1.1/4 Milling Chuck IdChipHole w/MAHO notch|Y
01|164791|5|3|Non-cancellable non-returnable after receipt of PO|Y
01|164791|5|4|ETA 3-5 days ARO|Y
01|164791|8|1|CAT50-C1.1/4165U-IDU-MH|Y
01|164791|8|2|CAT50 1.1/4 Milling Chuck IdChipHole with MAHO notch|Y
01|164791|8|3|Non-cancellable non-returnable after receipt of PO|Y
01|164791|8|4|ETA 3-5 days ARO|Y
01|164814|7|1|NB3006-0187-2.36CP Taper Plus  BT30 End Mill Holder|Y
01|164814|7|2|3/16 Coolant Ports|Y
01|164814|9|1|NB3006-0312-2.36CP Taper Plus  BT30 End Mill Holder|Y
01|164814|9|2|5/16 Coolant Ports|Y
01|164814|12|1|NB3006-0625-2.50CP Taper Plus BT30 End Mill Holder 5/8|Y
01|164814|12|2|Coolant Ports|Y
01|164814|13|1|NB3006-0750-3.00CP Taper Plus End Mill Holder 3/4|Y
01|164814|13|2|Coolant Ports|Y
01|164819|1|1|Item Non-Cancelable. Non-Returnable|Y
01|164835|4|1|External Cables|Y
01|164843|1|1|BMT65-ER25-AD-ICE - Internal & External Coolant|Y
01|164843|1|2|BMT65 ER25 Adjustable Angle Live Tool|Y
01|164861|1|1|Providing as Net Price|Y
01|164867|2|1|Replacement for 100TG Span|Y
01|164873|4|1|sub-plate to increase center height to 230MM|Y
01|164873|5|1|Installation includes: Drive unit short bar fiber|Y
01|164873|5|2|optic cable bulkhead cables external cables|Y
01|164873|5|3|parameter changes service itme and travel.|Y
01|164875|35|1|**We have one part#NT10-024 missing from the set.|Y
01|164875|35|2|#2 PositiveDrive Rigid Tap Collet .381x.286 9.7x7.3 3/8|Y
01|164875|35|3|We can ship partial and back order.|Y
01|164875|38|1|in stock option|Y
01|164884|1|1|UNV_5149 .375 dia Shrink fit 5.00 GL|Y
01|164884|1|2|Lyndex Part # CAT50-SF0375-5.00-IDKS|Y
01|164889|10|1|NOTE:  HSK100A-ER16-6.00B x1pc is available.|Y
01|164890|1|1|Solo 2 en stock|Y
01|164890|3|1|Solo 2 en stock|Y
01|164890|5|1|1 Para todos los cabezales.|Y
01|164890|5|2|Se necesita dibujo del husillo|Y
01|164900|2|1|Quoted at NET price and onc a purchase order is placed|Y
01|164900|2|2|it cannot be cancelled or returned|Y
01|164903|1|1|MNZ20-CAPTO4X-ICE-12K|Y
01|164903|1|2|199418|Y
01|164903|1|3|Mori Live C4 X-Axis STRT<Radial> Ext/INT Coolant|Y
01|164903|1|4|12K RPM REF DRWG# 00059481|Y
01|164903|2|1|MNZ20-CAPTO4Z-ICE-12K|Y
01|164903|2|2|199419|Y
01|164903|2|3|Mori Live C4 Z-Axis 90Deg<Axial> Ext/INT Coolant|Y
01|164903|2|4|12K RPM REF DRWG# 00059490|Y
01|164909|5|1|HARLINGEN Tx|Y
01|164910|5|1|***HSK63A-SK16-60P***|Y
01|164910|7|1|***HSK63A-SK16-90P***|Y
01|164910|12|1|***Swap ER20 Collet nut out with solid nut on above|Y
01|164910|12|2|HSK63A-ER20S-160|Y
01|164930|3|1|for standard speed holder|Y
01|164930|3|2|Spanner style|Y
01|164930|4|1|for hispeed holder|Y
01|164930|4|2|SMOOTH NUT finish|Y
01|164936|1|1|Reference RGA# LVR-57431|Y
01|164936|1|2|Repair of BMT65-ER32Z-72-ICE s/n: 20900245 04|Y
01|164936|1|3|(Mimatic# 192967)|Y
01|164936|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|164936|2|2|1 output spindle.|Y
01|164946|2|1|*****THIS is a non-standard stock item and is|Y
01|164946|2|2|Considered special. Once ordered it cannot be cancelled|Y
01|164946|2|3|or returned.|Y
01|164948|1|1|UNV_5245|Y
01|164958|1|1|NBT30-SF16-75CP|Y
01|164958|1|2|Price for 10pcs|Y
01|164958|2|1|HSK63A-SF16-75CP|Y
01|164958|2|2|Price for 10pcs|Y
01|164958|3|1|NBT30-SF16-75CP|Y
01|164958|3|2|Price for 2pcs|Y
01|164958|4|1|HSK63A-SF16-75CP|Y
01|164958|4|2|Price for 2pcs|Y
01|164964|3|1|NBT40-C32-135|Y
01|164964|5|1|NBT40-C20-70|Y
01|164964|10|1|NBT40-C25F-90|Y
01|164964|11|1|NBT40-C32F-90|Y
01|164964|12|1|NBT40-C20F-75|Y
01|164964|13|1|NBT40-C32F-120|Y
01|164990|1|1|New part # replaces SKN-6WB|Y
01|164991|1|1|Air Freight from NIKKEN|Y
01|164991|1|2|CNC260FA-M + CST101-135-RJ4 SO# 892687|Y
01|164991|2|1|TRUCK Freight Cost L-N to AWC|Y
01|165001|1|1|1st Batch/DWG Saved in Teams/File|Y
01|165001|2|1|1st Batch/DWG Saved in Teams/File|Y
01|165001|3|1|1st Batch/DWG Saved in Teams/File|Y
01|165003|1|1|CAT40-HC16-80SN|Y
01|165018|1|1|Option #1 SK50; AGH ER11; A=80mm L=238mm L1=100|Y
01|165018|1|2|External Coolant; Gear Ratio 1:1.67; Max 6Nm;|Y
01|165018|1|3|Max INPUT 72000RPM; Max OUTPUT 15000RPM;|Y
01|165018|1|4|Ref Drwg# 0052263|Y
01|165018|1|5|P/N: 140066 (will change upon order)|Y
01|165018|1|6|OPTION 1 Ref Benz WGZ-05 ER11|Y
01|165018|5|1|Option#2 SK20; AGH ER20; A=80mm L=262mm L1=100|Y
01|165018|5|2|Internal Coolant; Gear Ratio 1:1 Max 15Nm;|Y
01|165018|5|3|Max OUTPUT 8000RPM|Y
01|165018|5|4|Ref Drwg# 0053648|Y
01|165018|5|5|P/N: 140066 (will change upon order)|Y
01|165018|5|6|OPTION 2 Ref BENZ WGX-05 ER11|Y
01|165018|9|1|BT50; AGH ER50; A=80mm L=289.8mm Int/Ext Coolant|Y
01|165018|9|2|3Pin Support; Gear Ratio 2.5:1; Max 300Nm;|Y
01|165018|9|3|Max INPUT 2800RPM; Max OUTPUT 1120RPM|Y
01|165018|9|4|Ref Drwg# 00056317|Y
01|165018|9|5|P/N: 140066 (will change upon order)|Y
01|165018|13|1|SK50; AGH Capto5; A=80mm; L=260mm; L1=152mm|Y
01|165018|13|2|Gear Ratio 1:1; 150Nm; Max 5000RPM|Y
01|165018|13|3|Ref Drwg# 00046636|Y
01|165018|13|4|P/N: 140066 (will change upon order)|Y
01|165023|1|1|***EACH SET consists of 3pc to complete 1 chuck**|Y
01|165055|1|1|Reference RGA# LVR-57443|Y
01|165055|1|2|Repair of NK103-12000 s/n: AL0029 (Alps# NK103-12002)|Y
01|165055|2|1|Bearings o-rings collect nut and spindle to be|Y
01|165055|2|2|replaced.|Y
01|165058|3|1|Please note: We have C4007-0025-2.50 in stock if they|Y
01|165058|3|2|would like a quote on these as a replacement for ER20.|Y
01|165070|1|1|REF DRWG #00059617 Mazak Live Fixed Angle Head 10deg|Y
01|165070|1|2|ER or MI spindle Output internal coolant supply|Y
01|165070|2|1|REF DRWG #00059617 Mazak Live Fixed Angle Head 10deg|Y
01|165070|2|2|ER or MI spindle Output internal coolant supply|Y
01|165070|3|1|REF DRWG #00059617 Mazak Live Fixed Angle Head 10deg|Y
01|165070|3|2|ER or MI spindle Output internal coolant supply|Y
01|165073|1|1|currently 4ea in stock|Y
01|165076|1|1|10% Eastec Promo Applied - Valid thru 11/24/2021|Y
01|165082|1|2|Special Disc|Y
01|165083|1|1|As a part (not tool holder)|Y
01|165100|4|1|Hydraulic manifold block for individual switches|Y
01|165100|4|2|1-per table|Y
01|165100|6|1|Multi-Purpose Subplate that supports bolt on or ball|Y
01|165100|6|2|loc systems. Ball Loc require addational plates|Y
01|165102|2|1|for standard: ER8-EXT-500 or ER8-EXT-625|Y
01|165106|4|1|This is included in BT30-SK6-60. Don't need to buy|Y
01|165106|4|2|separately.|Y
01|165106|5|1|Compatible with PSB-26|Y
01|165122|3|1|Replaces CN103R007|Y
01|165124|14|1|Pilot DIAMETER IS .77 NOT .82|Y
01|165124|16|1|milling chuck is GTO|Y
01|165145|1|1|This item is considered spcial once ordered cannot|Y
01|165145|1|2|be cancelled or returned.|Y
01|165150|1|1|TCS-466CD-B & TCS-483D (tips) need to be supplied by|Y
01|165150|1|2|the customer|Y
01|165158|6|1|INSTALLATION AND TRAINING INCLUDE (2) 8 HOUR DAYS|Y
01|165158|6|2|TO INSTALL AND TRAIN ON PRESETTER AND TID.|Y
01|165158|10|1|INSTALLATION AND TRAINING FOR TID PER MACHINE|Y
01|165161|1|1|Note: cables Included|Y
01|165163|1|1|Reference RGA# TOR-57468|Y
01|165163|1|2|Repair of SF-FI5-UNIT-380 s/n: 5MB2058|Y
01|165166|3|1|ID chip hole installation & rebalance|Y
01|165166|3|2|Final part number will be C5001-1000-1.75-IDI|Y
01|165181|2|1|SF-POT-#40 are no charge and included with shrink|Y
01|165181|2|2|fit machine.|Y
01|165184|1|1|5AX-201MA SN: 5752|Y
01|165184|1|2|Customer had Tool/Machine Crash with Table|Y
01|165184|1|3|Table needs full rebuild|Y
01|165184|5|1|Replaces NIK-1555-300|Y
01|165189|1|1|Tooling Certificate Number:|Y
01|165195|1|1|H63A-SF8-5.00 no CP's of any kind|Y
01|165195|2|1|H63A-SF10-5.00 no CP's of any kind|Y
01|165195|3|1|H63A-SF12-6.50 no CP's of any kind|Y
01|165195|4|1|H63A-SF14-7.25  no CP's of any kind|Y
01|165195|5|1|H63A-SF16-7.25 no CP's of any kind|Y
01|165195|12|1|Factory catalog item - HSK63A 8mm Shrink 120mm GL|Y
01|165195|13|1|Factory Catalog Item - HSK63A 10mm Shrink 120mm Gl|Y
01|165195|14|1|Factory Catalog Item - HSK63A 12mm Shrink 160mm GL|Y
01|165195|15|1|Factory Catalog Item - HSK63A 14mm Shrink 200mm GL|Y
01|165195|15|2|With pluggable coolant ports|Y
01|165195|16|1|Factory Catalog item - HSK63A 16mm Shrink 200mm GL|Y
01|165195|16|2|with pluggable coolant ports|Y
01|165201|1|1|Base Option 1|Y
01|165201|3|1|Base Option 2 (1:2)|Y
01|165201|4|1|Base Option 2 (2:2)|Y
01|165201|6|1|S32-SK13-300  Straight Shank Extension OD32mm SK16 Slim|Y
01|165201|8|1|S32-SK13-300 >> Straight Shank Extension OD32mm SK13|Y
01|165201|8|2|Slim Chuck.|Y
01|165201|8|3|This item is non standard stock. Once a purchase order|Y
01|165201|8|4|is placed it cannot be cancelled or returned.|Y
01|165203|1|1|TAR-57368 5AX-201 SN#5752|Y
01|165203|5|1|replaces NIK-1555-300|Y
01|165216|1|1|1st Batch|Y
01|165216|2|1|1st Batch|Y
01|165219|1|1|TCS-466CD-B & TCS-483D need to be supplied by customer|Y
01|165219|1|2|TCS-466CD-B & TCS-483D are insert tips|Y
01|165223|2|1|MBT40-Q34-95|Y
01|165223|2|2|3Lock BT40 base holder|Y
01|165223|3|1|34-ZMAC70-70V-I|Y
01|165223|3|2|ZMAC boring head for ISO Triangular Insert|Y
01|165223|6|1|for ISO Rhomboid Insert|Y
01|165231|1|1|Tooling Certificate Number: 13687-899-122016|Y
01|165260|1|1|NZ32-24-140  Straight Shank Tap Holder 32mm shank|Y
01|165278|2|1|Cable set|Y
01|165278|5|1|Mazak|N
01|165281|3|1|Please Note: 040-Span is replacement for 100TG-Span|Y
01|165299|1|1|Tooling Certificate Number:|Y
01|165315|1|1|Must ship by truck.|Y
01|165316|1|1|standard with NO drive pins|Y
01|165316|1|2|*NET PRICE|Y
01|165316|4|1|*NET PRICE|Y
01|165316|7|1|*NET PRICE|Y
01|165329|1|1|CAT50-AF1-30-OH - Main Body|Y
01|165329|2|1|BF130-25-48-15.5C - Arbor|Y
01|165329|3|1|9BF130-25-48-15.5C-I - Byte|Y
01|165329|3|2|Min. Order Qty is 3 pcs.|Y
01|165329|4|1|AFC-15 - Inserts|Y
01|165329|4|2|Min. Order Qty is 10 pcs.|Y
01|165340|2|1|HEIDENHAIN GLASS SCALES FOR ROTARY + TILT AXES|Y
01|165348|1|1|**** Includes Power & Feedback cables to Machine Tool|Y
01|165348|1|2|Bulkhead ****|Y
01|165350|3|1|Wrench for holder above|Y
01|165350|6|1|In stock standard contact non dual contact|Y
01|165350|8|1|In stock standard contact Not a dual contact version|Y
01|165350|14|1|In stock solid nut version|Y
01|165350|16|1|In stock size|Y
01|165351|1|1|1st Btach|Y
01|165353|9|1|Item is Non-standard stock once a PO is received|Y
01|165353|9|2|it can not be cancelled or returned|Y
01|165354|1|1|1st Batch/(1)883639 Paragon SVC 6/4/21:DWG Approved/BT|Y
01|165354|2|1|1st Batch/CBO 4/12/21:DWG Approved/TR/Email7/15>7/30>8|Y
01|165354|3|1|1st Batch/CBO 4/12/21:DWG Approved/TR/Email7/15>7/30>8|Y
01|165354|4|1|1st Batch9/20 mfg>>10/8A|Y
01|165354|6|1|1st Batch/CBO 4/12/21:DWG Approved/TR/Email7/15>7/30>8|Y
01|165368|1|1|Refrence RGA# LVR-57353|Y
01|165368|1|2|Repair of MNL12-ER32Z-MS s/n: A2171 (Alps# T32216)|Y
01|165368|2|1|Bearings o-rings collet nut and spindle to be|Y
01|165368|2|2|replaced. If spindle can be reused the repair cost|Y
01|165368|2|3|will be $1719.20|Y
01|165386|1|1|5AX-4MT-NC5/85S-152.4FA|Y
01|165386|1|2|SN: 1185|Y
01|165386|1|3|TAR-56582|Y
01|165386|3|1|Parts Cost|Y
01|165386|3|2|Bearings/Seals/Worm Wheel/Worm Screw|Y
01|165386|3|3|Fixture Parts|Y
01|165386|3|4|Table needs full rebuild|Y
01|165386|4|1|Paint/Plating some parts + Packaging Fee|Y
01|165406|1|1|Pricing for 15+pcs|Y
01|165428|1|1|Part # B50FHM-ER32-220-110TP Mimatic part #|Y
01|165428|1|2|BT50 ER32 Angle Head Flex110mm Pitch Tapered Pin|Y
01|165428|1|3|Spec: 6000rpm 70NmOptn: CASE-MIM-170958 & Wrenches|Y
01|165428|1|4|x2 Included|Y
01|165428|1|5|NET priceno additional discount|Y
01|165428|1|6|Item is a special non cancelable nor returnable once|Y
01|165428|1|7|the order is place to our factory|Y
01|165428|2|1|NET price itemno additional discount given|Y
01|165445|1|1|Delivery - Ships from Factory 12-14 weeks A.R.O.|Y
01|165445|2|1|Delivery - Ships from Factory 12-14 weeks A.R.O.|Y
01|165445|14|1|Delivery - Ships from Factory 12-14 weeks A.R.O.|Y
01|165445|25|1|Includes install and balance|Y
01|165445|25|2|Price for 1 to 4 Holders|Y
01|165445|26|1|Includes install and balance|Y
01|165445|26|2|Price for 5 to 9 Holders|Y
01|165445|27|1|Includes install and balance|Y
01|165445|27|2|Price for 10 to 20 holders|Y
01|165445|28|1|Includes install and balance|Y
01|165445|28|2|Price for 21+ Holders|Y
01|165449|1|1|P/N: C5-ER11-150|Y
01|165457|1|1|H63A-SF8-5.00 no CP's of any kind|Y
01|165457|2|1|H63A-SF10-5.00 no CP's of any kind|Y
01|165457|3|1|H63A-SF12-6.50 no CP's of any kind|Y
01|165457|4|1|H63A-SF14-7.25  no CP's of any kind|Y
01|165457|5|1|H63A-SF16-7.25 no CP's of any kind|Y
01|165457|12|1|Factory catalog item - HSK63A 8mm Shrink 120mm GL|Y
01|165457|13|1|Factory Catalog Item - HSK63A 10mm Shrink 120mm Gl|Y
01|165457|14|1|Factory Catalog Item - HSK63A 12mm Shrink 160mm GL|Y
01|165457|15|1|Factory Catalog Item - HSK63A 14mm Shrink 200mm GL|Y
01|165457|15|2|With pluggable coolant ports|Y
01|165457|16|1|Factory Catalog item - HSK63A 16mm Shrink 200mm GL|Y
01|165457|16|2|with pluggable coolant ports|Y
01|165469|1|1|5P RJ for 5AX-200TDMA|Y
01|165492|1|1|part# H63A(80)-SF12-70CP-IDI|Y
01|165492|1|2|H63A(80) 12mm Shrink Fit w/ 70mm gage length|Y
01|165492|1|3|Coolant Ports|Y
01|165492|1|4|*Orizon spec: Pan Head Screws for ID Chip Hole.|Y
01|165492|1|5|Chip (BIS-C-122-04/L) and coolant tube installed at|Y
01|165492|1|6|factory|Y
01|165497|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|165499|1|1|Includes Haas Motors and Cables.|Y
01|165500|1|1|On CBO for updated delv|Y
01|165501|1|1|Note: Wrench-ALLEN6 included with holder|Y
01|165501|31|1|SKJ16-7.5 SK13/SK16 Coolant Cap 7.5mm Jet Slots|Y
01|165516|1|1|AHL-CAT40-B1.65G|Y
01|165516|1|2|CAT40 Universal Angle Head-Lite Duty|Y
01|165516|2|1|Setting Block BT-1|Y
01|165524|1|1|NC5-46-BLK40-100|Y
01|165524|1|2|NC5-46 Blank Bar installed with PS-123-AIR at factory|Y
01|165524|2|1|Installed on NC5-46-BLK40-100 at factory|Y
01|165524|7|1|NC5-46-BLK40-100|Y
01|165524|7|2|NC5-46 Blank Bar installed with PS-123-AIR at factory|Y
01|165524|8|1|Installed on NC5-46-BLK40-100 at factory|Y
01|165524|16|1|NC5-46-BLK40-100|Y
01|165524|16|2|NC5-46 Blank Bar installed with PS-123-AIR at factory|Y
01|165524|17|1|Installed on NC5-46-BLK40-100 at factory|Y
01|165526|2|1|TCE-A3228/0|Y
01|165526|3|1|Delivery & Price pending|Y
01|165531|1|1|Quote includes Power & Feedback cables from table|Y
01|165531|1|2|to Machine Tool Bulkhead. 4th Axis Interface required|Y
01|165531|1|3|Existing MachineOSP300 Servo. Price is for OSP3-M|Y
01|165533|13|1|Please Note: Replaces SKN-10BJ(GH)|Y
01|165533|14|1|Please note: Replaces SKN-10B|Y
01|165548|7|1|Substitute for for 25mm end mill holder|Y
01|165548|10|1|Substitute for for 25mm end mill holder|Y
01|165548|51|1|HSK63A-SLS25-110|Y
01|165548|51|2|HSK63A 25mm End Mill Holder|Y
01|165554|7|1|Toby will check if wrench is needed|Y
01|165564|6|1|EXTERNAL POWER/FEEDBACK CABLES 4TH/5TH AXES|Y
01|165564|7|1|HYDRAULIC MANIFOLDS PRESSURE REGULATORS FOR AIR/HYD|Y
01|165564|9|1|SENDING EXTRA 2 MOTORS AT NO COST|Y
01|165564|10|1|2 FREE TOOLING CERTIFICATES FROM LYNDEX NIKKEN|Y
01|165571|9|1|Quoted as an in stock alternative to the above holder|Y
01|165578|1|1|Reference RGA# TOR-57390|Y
01|165578|1|2|Repair of SF-START2-UNIT-200 s/n: 2J0092|Y
01|165583|12|1|This item is considered special once ordered cannot|Y
01|165583|12|2|be cancelled or returned.|Y
01|165583|13|1|Part # K32-SK13-150|Y
01|165583|13|2|This item is considered special once ordered cannot|Y
01|165583|13|3|be cancelled or returned|Y
01|165592|1|1|Direct replacement for SKN-10BJ|Y
01|165592|5|1|Direct replacement for SKN-6WBJ|Y
01|165605|9|1|INCLUDES ONE 8 HOUR DAY OF INSTALLATION &|Y
01|165605|9|2|TRAINING.|Y
01|165610|1|1|UNV_412  H63A-SF0500-3.125-GKN|Y
01|165610|1|2|No backup screw needed|Y
01|165614|2|1|P/N: NBT50-MDSK20-165|Y
01|165614|2|2|2lock BT50 Major Dream SK20 Slim Chuck w 165mm g.l.|Y
01|165618|3|1|**interchangeable handle for other ER-G collet chucks|Y
01|165625|1|1|1st Batch|Y
01|165625|2|1|1st Batch|Y
01|165625|3|1|1st Batch|Y
01|165625|4|1|1st Batch|Y
01|165625|5|1|1st Batch|Y
01|165625|6|1|1st Batch|Y
01|165625|7|1|1st Batch|Y
01|165628|1|1|NBT50-MDSK20-165|Y
01|165636|6|1|New Part Number-replaces SKN-10BJ(GH)|Y
01|165640|1|1|Qty 1-4|Y
01|165640|2|1|Qty 5-9|Y
01|165640|3|1|Qty 10+pc|Y
01|165662|5|1|Includes one on site visit for oil change and backlash|Y
01|165662|5|2|inspection and adjustment if required.|Y
01|165686|2|1|In stock option with a little longer GL|Y
01|165686|5|1|In stock solid nut option as oppossed to bearing nut|Y
01|165689|1|1|Reference RGA# CUR-57422|Y
01|165689|1|2|Repair of H80FRAM-ER16-206ST s/n: 3964301|Y
01|165689|1|3|(Mimatic# 167594)|Y
01|165689|2|1|Bearings seals o-rings and gears to be replaced.|Y
01|165689|2|2|Recondition 1 input spindle.|Y
01|165728|1|1|Qty 100-499|Y
01|165728|2|1|Qty 500+|Y
01|165728|3|1|Qty 100-499|Y
01|165728|4|1|Qty 500+|Y
01|165762|1|1|Qty 100-499|Y
01|165762|2|1|Qty 500+|Y
01|165762|3|1|Qty 100-499|Y
01|165762|4|1|Qty 500+|Y
01|165771|3|1|Please Note: If customer is not running coolant thru|Y
01|165771|3|2|the tap they can use this collet.|Y
01|165774|1|1|P/N: BMT45-ER16-AD-ICE|Y
01|165774|1|2|BMT45 ER 16 Adjustable live tool w IntC|Y
01|165774|2|1|P/N: BMT45-ER16-AD|Y
01|165779|1|1|CNC260MA 6+1p R/Joint Special Motor Cover|Y
01|165779|1|2|Serial Number: 13217C|Y
01|165779|2|1|TCE-96955/2|Y
01|165779|2|2|4-AXIS SIGNAL CABEL(INSIDEFEEDBACK)|Y
01|165779|3|1|TCE-A7035/4|Y
01|165779|3|2|4-AXIS POWERSIGNAL CABEL(INSIDE)|Y
01|165779|4|1|match s/n.5365 with Groove|Y
01|165791|1|1|TAR-57490|Y
01|165791|1|2|CNCZ100-4W SN:9067C|Y
01|165791|37|1|Motor Cover|Y
01|165801|1|1|Qty 100-499|Y
01|165801|2|1|Qty 500+|Y
01|165801|3|1|Qty 100-499|Y
01|165801|4|1|Qty 500+|Y
01|165803|1|1|Qty 1-4|Y
01|165803|2|1|Qty 5-9|Y
01|165803|3|1|Qty 10+pc|Y
01|165805|1|1|Qty 100-499|Y
01|165805|2|1|Qty 500+|Y
01|165805|3|1|Qty 100-499|Y
01|165805|4|1|Qty 500+|Y
01|165821|1|1|Master Jaw Set for H034M10|Y
01|165824|1|1|replaces S1005-0562-7.63|Y
01|165831|1|1|Qty 100-499|Y
01|165831|2|1|Qty 500+|Y
01|165831|3|1|Qty 100-499|Y
01|165831|4|1|Qty 500+|Y
01|165834|2|1|Please note: Max pressure is 1000 PSI|Y
01|165834|3|1|Stallion 9/23 - trunnion table with a 9x23 working|Y
01|165834|3|2|surface. Guranteed flat and square within .001.|Y
01|165834|3|3|Outboard support with dual disk pneumatic clamping.|Y
01|165834|3|4|1.25 thick baseplate for assembly. All mounting|Y
01|165834|3|5|Hardware lines and fittings are included.|Y
01|165834|3|6|Drilled for Hydraulic/pneumatic Rotary Joint connection|Y
01|165836|8|1|***We can ship partial or ship complete less our part#|Y
01|165836|8|2|SK20-9/16A on back order ETA 10/15|Y
01|165852|3|1|Quoted as an in stock option for line 2|Y
01|165852|4|1|Quoted as an in stock option for the above called|Y
01|165859|1|1|MNZ20-ER20X-MD-ICE|Y
01|165859|1|2|MORI LIVE; BMT40; ER20 STRAIGHT DUAL IN Z_AXIS;|Y
01|165859|1|3|INT/EXT Coolant 8000RPM|Y
01|165866|1|1|Qty 100-499|Y
01|165866|2|1|Qty 500+|Y
01|165866|3|1|Qty 100-499|Y
01|165866|4|1|Qty 500+|Y
01|165871|1|1|Qty 100-499|Y
01|165871|2|1|Qty 500+|Y
01|165871|3|1|Qty 100-499|Y
01|165871|4|1|Qty 500+|Y
01|165880|1|1|Este es un articulo especial al colocar una orden de|Y
01|165880|1|2|compra no se aceptan cancelaciones ni devoluciones|Y
01|165882|2|1|and ER25 live tools|Y
01|165882|5|1|**Special - this item cannot be cancelled or returned.|Y
01|165901|1|1|10% Extra discount added for Eastec Promo|Y
01|165901|2|1|10% Extra discount added for Eastec Promo|Y
01|165901|3|1|Shrink Fit unit comes with two CAT40 pots|Y
01|165901|4|1|10% Extra discount added for Eastec Promo|Y
01|165902|4|1|**use with existing SK16-4 collets and coolant nut|Y
01|165904|1|1|1st Batch|Y
01|165904|2|1|1st Batch|Y
01|165904|3|1|1st Batch|Y
01|165904|4|1|INS:Need to check dual contact tolerance.|Y
01|165904|5|1|INS:Need to check dual contact tolerance.|Y
01|165904|6|1|INS:Need to check dual contact tolerance.|Y
01|165904|7|1|INS:Need to check dual contact tolerance.|Y
01|165912|1|1|With OSP3 motor.|Y
01|165912|1|2|Cable set included.|Y
01|165922|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|165923|1|1|DEMO UNIT - WH2|Y
01|165923|1|2|Price includes Freight to CMS Fabrication.|Y
01|165923|2|1|Included with Purchase of START2 Shrink Fit Machine|Y
01|165925|1|1|CNCZ401FA-M 8+1 rotary joint|Y
01|165925|1|2|No cables|Y
01|165926|1|1|Qty 1-4|Y
01|165926|2|1|Qty 5-9|Y
01|165926|3|1|Qty 10+pc|Y
01|165934|3|1|Include Hand Labor and Electronic Fanuc comp.|Y
01|165940|2|1|In stock option|Y
01|165944|1|1|Tooling Certificate Number:7585-2651-051320|Y
01|165944|1|2|Total TC worth $3000.00 List Price|Y
01|165964|3|1|***Alternative***|Y
01|166001|1|1|ref. Mimatic 174674|Y
01|166004|1|1|P/N: HSK80C-NX4-177|Y
01|166004|1|2|Special HSK80C taper NX4 Spindle Speeder|Y
01|166014|26|1|Alternative - Solid Nut|Y
01|166014|28|1|Alternative - Solid Nut|Y
01|166014|31|1|Bearing Nut Wrench|Y
01|166014|33|1|Alternative - Solid Nut|Y
01|166014|35|1|Alternative - Solid Nut|Y
01|166014|39|1|Alternative - Solid Nut|Y
01|166014|41|1|Alternative - Solid Nut|Y
01|166023|10|1|This charge is to machine ID Chip Hole install ID Chip|Y
01|166023|10|2|itself and re-balancing of holders. Once the|Y
01|166023|10|3|Modification process has started these cannot be|Y
01|166023|10|4|cancelled or returned.|Y
01|166034|1|1|Mim#199657|Y
01|166034|1|2|CAT50 DUAL CONTACT; MI63; 30DEG FIX AGH; A= 80mm;|Y
01|166034|1|3|INT/ EXT COOLANT; 1.5/1 GEAR RATIO;|Y
01|166034|1|4|MAX INPUT 2000RPM; MAX OUTPUT1330 RPM;|Y
01|166034|1|5|MAX 90Nm;|Y
01|166034|1|6|REF DRWG # 00059673;|Y
01|166034|1|7|4-5 WKS DESIGN DRAWING MUST BE APPROVED PRIOR TO MFG|Y
01|166034|1|8|MFG/SHIP TIME 12-13WKS AFTER DRAWING APPROVAL|Y
01|166034|6|1|ETA 1 WEEK AFTER DRAWING APPROVAL|Y
01|166035|1|1|**Part#NC5006-32-4.00CP*** Will include (Coolant Port)|Y
01|166037|1|1|Replacement Table for 5AX-201HFA-M SN: 2004|Y
01|166037|1|2|RGA TAR-57492 - current table was not repairable|Y
01|166045|1|1|Tooling Certificate Number:|Y
01|166060|1|1|*non-standard stock - cannot be cancelled or returned|Y
01|166060|1|2|105mm/ 4.13 gage length|Y
01|166062|1|1|Please Note: Toolholder is non standard stock once a|Y
01|166062|1|2|purchase order is placedit cannot be cancelled|Y
01|166062|1|3|or returned.|Y
01|166062|1|7|e|N
01|166062|7|1|Please Note: Toolholder is non standard stock once a|Y
01|166062|7|2|purchase order has been placed it cannot be cancelled|Y
01|166062|7|3|or returned.|Y
01|166062|8|1|Please Note: Toolholder is non standard stock once a|Y
01|166062|8|2|purchase order has been placed it cannot be cancelled|Y
01|166062|8|3|or returned.|Y
01|166063|2|1|TOOL STOOL IS CONSIDERED A NON-STOCK SPECIAL|Y
01|166063|2|2|IT IS NON-CANCELLABLE & NON-RETURNABLE|Y
01|166066|2|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|166066|2|2|of spindle drawing confirmation|Y
01|166066|2|3|*NET price|Y
01|166066|2|4|*Custom block - cannot be cancelled or returned|Y
01|166092|8|1|4-5 Wks Aprox|Y
01|166102|2|1|In stock option|Y
01|166108|1|1|Qty 100-499|Y
01|166108|2|1|Qty 500+|Y
01|166108|3|1|Qty 100-499|Y
01|166108|4|1|Qty 500+|Y
01|166119|1|1|Qty 100-499|Y
01|166119|2|1|Qty 500+|Y
01|166119|3|1|Qty 100-499|Y
01|166119|4|1|Qty 500+|Y
01|166130|1|1|TAR-57432 5AX-201FA-M-AB SN: 5043|Y
01|166130|1|2|Table was locked up.  Table/Machine Crash|Y
01|166130|1|3|Bearings/Seals/Worm Wheel/Screws and Rotary Joint need|Y
01|166130|1|4|to be replaced - full overhaul.|Y
01|166140|2|1|Closest to 12mm size|Y
01|166140|3|1|1/16 pilot bore can be sized to exact dimension needed|Y
01|166150|1|1|Reference RGA# LVR-57419|Y
01|166150|1|2|Repair of MZMP5-ER40Z-ICE s/n: 61528 03|Y
01|166150|1|3|(Mimatic# 131597)|Y
01|166150|2|1|Bearings seals o-rings to be replaced. Recondition 1|Y
01|166150|2|2|input and 1 output spindles.|Y
01|166150|4|1|Repair of MZQT5-ER32Z-MS-C-3MP s/n:19902698 05|Y
01|166150|4|2|(Mimatic# 182142)|Y
01|166150|5|1|Bearings seals o-rings to be replaced. Recondition|Y
01|166150|5|2|1 output spindle.|Y
01|166151|1|1|1st Batch/for stock  5/26 APPROVED BY TIM8/30>9/30 mfg|Y
01|166151|2|1|Req INS/install E16-NUT|Y
01|166151|3|1|1st Batch(1)888365 7/27 approved by Tim10/30mfg>>ESD 1|Y
01|166151|4|1|1st Batch/CBO 4/12/21:DWG Approved/TR/Email7/15>7/30>8|Y
01|166151|5|1|1st Batch/CBO 4/12/21:DWG Approved/TR/Email7/15>7/30>8|Y
01|166156|1|1|Quoted at NET pricing|Y
01|166171|45|1|FREE SMALLER DIAMETER NUTS TO GO ON C6-ER16-100|Y
01|166173|1|1|Reference RGA # CUR-57404|Y
01|166173|1|2|Repair of C50RAM-ER40-215TS-110TP s/n 64653 01|Y
01|166173|1|3|(Mimatic# 184455)|Y
01|166173|2|1|Bearings Seals and O-Rings to be replaced.|Y
01|166173|2|2|Recondition 1 Output Spindle.|Y
01|166176|1|1|HSK50E-MMC8C-127-AA|Y
01|166176|1|2|HSK50E 10mm Mini-Mini Chuck Coolant|Y
01|166176|1|3|Advanced Alpha *new generation|Y
01|166189|1|1|Discontinued model. No Tooling Cert.|Y
01|166194|1|1|Estimated time of arrival with previous SO 2-3 mounths|Y
01|166194|5|1|Necessary for SK16-11.5|Y
01|166194|6|1|Necessary for SK20-17 SK25-18|Y
01|166199|1|1|Quoted at NET pricing|Y
01|166202|26|1|Alternative - Solid Nut|Y
01|166202|28|1|Alternative - Solid Nut|Y
01|166202|31|1|Bearing Nut Wrench|Y
01|166202|33|1|Alternative - Solid Nut|Y
01|166202|35|1|Alternative - Solid Nut|Y
01|166202|39|1|Alternative - Solid Nut|Y
01|166202|41|1|Alternative - Solid Nut|Y
01|166210|1|1|5-9pc|Y
01|166210|1|2|*min requirement 5pc|Y
01|166210|2|1|10-19pc|Y
01|166210|3|1|20+pc|Y
01|166230|1|1|Onetime 13% discount extended for demo unit only|Y
01|166230|2|1|Onetime 13% discount extended for demo unit only|Y
01|166230|4|1|Optional Stand|Y
01|166230|4|2|Onetime 13% discount extended for demo unit only|Y
01|166236|4|1|SOLID NUT|Y
01|166241|12|1|KM42-15.65 collet|Y
01|166241|14|1|All items are considered non standard stock specials|Y
01|166241|14|2|Not cancelable nor returnable once order placed to|Y
01|166241|14|3|factory.|Y
01|166241|14|4|Lead time is around 14 weeks ARO|Y
01|166254|3|1|9UNTC100-PLB30|Y
01|166254|3|2|Pull Bolt for Taper Cleaner (BT30)|Y
01|166254|4|1|9UNTC100-PLB40A(CAT)|Y
01|166254|4|2|Pull Bolt for Taper Cleaner (CAT40)|Y
01|166256|1|1|Req.INS/Install E40-NUT *B/U Screws are equipped.|Y
01|166266|1|1|Reference RGA# CUR-56657|Y
01|166266|1|2|Repair of PRE-PART-05PAN for customer's E238 presetter|Y
01|166266|1|3|s/n: 7155.|Y
01|166272|1|1|Includes Haas Motor and Cables.|Y
01|166272|5|1|Custom Adapter Plate for Hydraulic Royal Collet Chuck|Y
01|166276|1|1|Reference RGA# LVR-57517|Y
01|166276|1|2|Repair of MZQT47-ER32X-OFF-C s/n: 3010102|Y
01|166276|1|3|(Mimatic# 124259)|Y
01|166276|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|166276|2|2|1 input and 1 output spindle.|Y
01|166276|4|1|Repair of MZQT47-ER32X-OFF-C s/n: 3010103|Y
01|166276|4|2|(Mimatic# 124259)|Y
01|166276|5|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|166276|5|2|1 input and 1 output spindle.|Y
01|166286|4|1|**Alternate***|Y
01|166286|6|1|**HOT DEALS** DIST Net $145 EU Net $181 While Qtys Las|Y
01|166286|6|2|** Closeout Promotion! All sales are FINAL!**|Y
01|166286|6|3|** Confirm Cust. Has Balance Mach. **|Y
01|166291|1|1|1st Batch|Y
01|166291|2|1|1st Batch|Y
01|166291|3|1|1st Batch|Y
01|166318|1|1|KM32-3.95 collet|Y
01|166318|1|2|Special item non cancelable nor returnable once|Y
01|166318|1|3|order is placed to the factory|Y
01|166318|2|1|KM32-4.95 collet|Y
01|166318|2|2|Special item non cancelable nor returnable once|Y
01|166318|2|3|order is placed to the factory|Y
01|166318|3|1|KM32-8.95 collet|Y
01|166318|3|2|Special item non cancelable nor returnable once|Y
01|166318|3|3|order is placed to the factory|Y
01|166318|4|1|KM32-9.95 collet|Y
01|166318|4|2|Special item non cancelable nor returnable once|Y
01|166318|4|3|is placed to the factory|Y
01|166318|5|1|KM32-11.95 collet|Y
01|166318|5|2|Special item non cancelable nor returnable once|Y
01|166318|5|3|is placed to the factory|Y
01|166318|6|1|KM32-6.75 collet|Y
01|166318|6|2|Special item non cancelable nor returnable once|Y
01|166318|6|3|is placed to the factory|Y
01|166318|7|1|KM32-15.95 collet|Y
01|166318|7|2|Special item non cancelable nor returnable once|Y
01|166318|7|3|is placed to the factory|Y
01|166318|8|1|KM32-22 collet|Y
01|166318|8|2|Special item non cancelable nor returnable once|Y
01|166318|8|3|order is placed to the factory|Y
01|166318|9|1|Special item non cancelable nor returnable once|Y
01|166318|9|2|order is placed to the factory|Y
01|166318|10|1|KM32-5.95 collet|Y
01|166318|10|2|Special item non cancelable nor returnable once|Y
01|166318|10|3|order is placed to the factory|Y
01|166318|11|1|Special item non cancelable nor returnable once|Y
01|166318|11|2|order is placed to the factory|Y
01|166318|12|1|KM32-15.65 collet|Y
01|166318|12|2|Special item non cancelable nor returnable once|Y
01|166318|12|3|order is placed to the factory|Y
01|166318|13|1|KM32-10.20 collet|Y
01|166318|13|2|Special item non cancelable nor returnable once|Y
01|166318|13|3|order is placed to the factory|Y
01|166318|14|1|Special item non cancelable nor returnable once|Y
01|166318|14|2|order is placed to the factory|Y
01|166319|1|1|Air Solenoid and Clamp/Unclamp Switches for Chuck|Y
01|166319|2|1|Retrofit PBA Tailstock with clamp/unclamp conf sensors|Y
01|166319|2|2|Comes with brackets/sensors/and cover|Y
01|166319|2|3|** Cable integration needed by retrofit company **|Y
01|166319|3|1|Misc Fittings/Air Lines and Hardware|Y
01|166325|1|1|Quality Check|Y
01|166325|2|1|Quality Check|Y
01|166325|3|1|Quality Check|Y
01|166325|4|1|Quality Check|Y
01|166325|5|1|Quality Check|Y
01|166325|6|1|Quality Check|Y
01|166325|7|1|Quality Check|Y
01|166325|8|1|1st Batch|Y
01|166325|9|1|1st Batch|Y
01|166325|10|1|1st Batch|Y
01|166328|1|1|Annual on-site table inspection service fee|Y
01|166328|1|2|for Suncall America|Y
01|166328|1|3|Hobbing Machines CNCZ321MA x6 Units|Y
01|166328|1|4|Grinding Machine CNC170 x1 Unit|Y
01|166353|1|1|TBD NK103-7Q000|Y
01|166353|1|2|Nakamura Live ER25 Z-Axis 90Deg MainSub ExtCoolant|Y
01|166353|1|3|C/H=55mm 6000RPM|Y
01|166361|8|1|Alternate for HSK63A-SK16-80|Y
01|166377|1|1|Seal Kit for H012M25 R-217|Y
01|166385|1|1|KM1.1/4-8.5 Straight Collet/Sleeve 1.1/4 OD X 8.5mm ID|Y
01|166397|1|1|MZST68-ER32Z-MS-HS2  Mazak Live ER32 Z-Axis 90Deg Horiz|Y
01|166397|1|2|with 1:2 gear 12k RPM|Y
01|166397|1|3|Quoted at NET pricing|Y
01|166397|1|4|Will need signed approval drawing if ordered|Y
01|166397|2|1|MZST68-ER32X-OFF-HS-ICE  Mazak Live ER32 X-Axis STRT|Y
01|166397|2|2|with 1:2 gear 12k RPM|Y
01|166397|2|3|Quoted at NET pricing|Y
01|166401|1|1|No INS needed.|Y
01|166401|2|1|No INS needed.|Y
01|166401|3|1|No INS needed.|Y
01|166401|4|1|No INS needed.|Y
01|166419|1|1|Not 1st batch but need INS for QC purpose.|Y
01|166419|2|1|Not 1st batch but need INS for QC purpose.|Y
01|166419|3|1|Not 1st batch but need INS for QC purpose.|Y
01|166424|3|1|P/N: E32-118(C)|Y
01|166424|3|2|ER 32 3mm coolant collet|Y
01|166424|4|1|P/N: ER20-118(C)|Y
01|166430|1|1|Qty 1-4|Y
01|166430|2|1|Qty 5-9|Y
01|166430|3|1|Qty 10+pc|Y
01|166439|1|1|Reference RGA# QUA-57513|Y
01|166439|1|2|Repair of BMT45-ER25X-ICE s/n 2090074406|Y
01|166439|1|3|(Mimatic # 188040)|Y
01|166439|2|1|Bearings Seals and O-Rings to be replaced.|Y
01|166439|2|2|Recondition 1 Spindle|Y
01|166441|1|1|Special Price Per Quantity|Y
01|166441|2|1|Interface Fanuc components (Drive and cables)|Y
01|166441|2|2|Hyundai KF4600II  Fanuc Smart Plus|Y
01|166441|2|3|5-6Wks|Y
01|166445|2|1|Quoted as NET price.|Y
01|166448|1|1|Delivery 1 week after design is completed|Y
01|166456|1|1|ref. AC1313|Y
01|166460|1|1|Reference RGA# TOR-57525|Y
01|166460|1|2|Repair of HSK100A-C1.1/4-115|Y
01|166465|45|1|FREE SMALLER DIAMETER NUTS TO GO ON C6-ER16-100|Y
01|166493|1|1|AC4-SSMS-100-WA  >> MNZ20-CAPTO4X-MS-CST|Y
01|166493|1|2|MD= MNZ0254010LC|Y
01|166493|2|1|AC4-SSMS-100-WA >> MNZ20-CAPTO4X-MS-CST|Y
01|166493|2|2|MD= MNZ0500140|Y
01|166493|2|3|Same as line #1. We do not offer single holders.|Y
01|166493|3|1|AC4-SRMS100-51000 >> L-N # MNZ20-CAPTO4Z-C-STAT|Y
01|166493|3|2|MD = MNZ0294010LC|Y
01|166493|4|1|MNZ20-CAPTO4Z-ICE-12K Mimatic #199417|Y
01|166493|4|2|MNZ0510140|Y
01|166493|6|1|MNZ20-ER20Y-MD >> Similar to Mimatic #195857 SK16|Y
01|166493|6|2|MNZ0030420|Y
01|166493|6|3|Please Note: Delivery is based upon receipt of order|Y
01|166493|6|4|after  final approval drawings have been received.|Y
01|166493|6|5|Please allow additional time for the approval drawing|Y
01|166493|6|6|process. This item is Special. Once a purchase order|Y
01|166493|6|7|is placed it cannot be cancelled or returned.|Y
01|166493|6|8|Warranty: 1 year for internal components. 2 year for|Y
01|166493|6|9|manufacturer warranty on external body.|Y
01|166494|1|1|Replacement Quote for RGA: TOR-57525.|Y
01|166514|1|1|BMT55-CAPTO3X-ICE|Y
01|166514|1|2|AGW-BMT-A-C3B-I|Y
01|166514|1|3|197599|Y
01|166516|1|1|HSK63F-SK13-70P|Y
01|166518|7|1|Lyndex-Nikken to make position block upon receipt|Y
01|166518|7|2|of spindle drawing|Y
01|166520|6|1|Direct replacement for SKN-10B|Y
01|166522|1|1|Tooling Certificate Number: 10220-3067-100721|Y
01|166522|2|1|P/N: HSK63F-SK13-70P|Y
01|166580|1|1|Reference RGA# LVR-57539|Y
01|166580|1|2|Repair of BMT65-SK20Z-ICE s/n: 1990475702|Y
01|166580|1|3|MIM#192968|Y
01|166580|2|1|Bearings Seals and O-Rings to be replaced.|Y
01|166580|2|2|Recondition 1 Output Spindle|Y
01|166581|1|1|Lead time on this table is 2-3 weeks|Y
01|166594|5|1|Note: Items are specials once a PO has been received|Y
01|166594|5|2|it can no be cancelled or returned.|Y
01|166594|6|1|Note: Items are specials once a PO has been received|Y
01|166594|6|2|it can no be cancelled or returned.|Y
01|166600|1|1|Nikken Part # BT30-NR2351-208|Y
01|166605|1|1|**TWO POTS OF YOUR CHOICE INCLUDED**|Y
01|166612|1|1|BT30-SF3-90 dual contact BT30 shrink fit3mm90mGL|Y
01|166612|2|1|BT30-SF4-90 dual contact BT30 shrink fit4mm90mGL|Y
01|166612|3|1|BT30-SF6-90 dual contact BT30 shrink fit6mm90mGL|Y
01|166612|3|2|3pcs in stock at factory|Y
01|166612|4|1|NBT30-SF8-90 dual contact BT30 shrink fit8mm90mGL|Y
01|166612|4|2|2pcs stock at factory|Y
01|166612|5|1|BT30-SF10-90 dual contact BT30 shrink fit10mm90mGL|Y
01|166641|2|1|Include Han Labor and interface|Y
01|166641|8|1|2 ADAPTER PLATES/DRAW BAR|Y
01|166641|10|1|SOFT JAWS EXTRA LENGTH|Y
01|166649|1|1|BMT65-ER25-AD-ICE|Y
01|166649|1|2|BMT65 ER25 Adj- ICE Live Tool|Y
01|166653|1|1|Reference RGA# LVR-57516|Y
01|166653|1|2|Repair of OKL3-ER32Z-OFMS s/n: AL163(Alps# OK109-15001)|Y
01|166653|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|166653|2|2|replaced.|Y
01|166659|3|1|Replaces C4016-0250-4.00same part new #|Y
01|166659|9|1|Replaces the C4016-0375-4.00same part new #|Y
01|166659|10|1|Replaces C40S6-0500-1.75 same part new #|Y
01|166659|12|1|Replaces part #C4016-0500-4.00same part new #|Y
01|166659|15|1|Replaces C40S6-0750-1.75same part new #|Y
01|166664|1|1|NBT30-SK13C-120-J|Y
01|166664|1|2|NBT30 Dual Contact SK13 Slim Chuck w/ Coolant Nut|Y
01|166691|29|1|Wrench for ER Collet Chuck|Y
01|166691|31|1|Wrench for 100tg collet chuck|Y
01|166693|1|1|includes 2x Taper Pots at no additional charge|Y
01|166696|1|1|TAR-57425 CNC180OSP sn: 15147|Y
01|166700|1|1|Qty 100-499|Y
01|166700|2|1|Qty 500+|Y
01|166700|3|1|Qty 100-499|Y
01|166700|4|1|Qty 500+|Y
01|166703|1|1|Qty 1-4|Y
01|166703|2|1|Qty 5-9|Y
01|166703|3|1|Qty 10+pc|Y
01|166705|1|1|ref. AC1313|Y
01|166712|1|1|P/N: 160-1.006|Y
01|166727|1|1|10% extra discount added for Eastec Promo|Y
01|166727|2|1|10% extra discount added for Eastec Promo|Y
01|166727|3|1|Shrink Fit Unit comes with two CAT40 pots|Y
01|166743|4|1|2 piece pricemust be ordered at same timeon same PO|Y
01|166749|6|1|9UNTC100-PLB40A(CAT)|Y
01|166749|6|2|Connection Pull bolt for CAT40|Y
01|166749|7|1|9UNTC100-PLB40|Y
01|166749|7|2|Connection Pull bolt for BT40|Y
01|166749|10|1|for US 110-120V|Y
01|166749|11|1|JPN 100V|Y
01|166749|11|2|A converter is required for use with US power supply.|Y
01|166759|1|1|Special - non cancelable/non returnable|Y
01|166759|5|1|Special - non cancelable/non returnable|Y
01|166759|9|1|Special - non cancelable/non returnable|Y
01|166759|9|2|1 in stock in US|Y
01|166759|9|3|Stock in Japan (2-3 weeks)|Y
01|166765|3|1|9UNTC100-PLB40A(CAT)|Y
01|166765|3|2|Taper cleaner connection Pull bolt for CAT40|Y
01|166765|4|1|9UNTC100-PLB50A(CAT)|Y
01|166765|4|2|Taper cleaner connection Pull bolt for CAT50|Y
01|166765|5|1|9UNTC100-PLB63|Y
01|166765|5|2|Taper cleaner connection Pull bolt for HSK63|Y
01|166777|2|1|In stock option|Y
01|166780|1|1|New part # replaces C4026-0375-5.00|Y
01|166780|3|1|New part # replaces E11-6S(C)|Y
01|166780|4|1|New part # replaces E11--7S(C)|Y
01|166781|1|1|External cables include|Y
01|166781|5|1|Economy version(no Nikken Brand)|Y
01|166789|4|1|Installation kit: Includes drive unit short bar|Y
01|166789|4|2|fiber optic cable bulkhead cables external cables.|Y
01|166790|1|1|*no drive pins|Y
01|166797|1|1|Ths is considered a special item is non-cancelable|Y
01|166797|1|2|and non-returnable after recipt of PO|Y
01|166800|1|1|OKEX-ID15Z|Y
01|166801|3|1|3 in stock|Y
01|166801|4|1|plenty of stock|Y
01|166801|5|1|plenty of stock|Y
01|166802|2|1|Wrench for chuck if do not already have|Y
01|166804|2|1|BUILD TO ORDER|Y
01|166805|1|1|WAREHOUSE 2 TOOls.|Y
01|166815|1|1|BMT 65 1.5 ID BORING BAR HOLDER IN/EX COOLANT|Y
01|166831|3|1|Requires hydraulic for the brake system|Y
01|166831|5|1|Includes: Dual axis drive short bar fiber optic cable|Y
01|166831|5|2|communication cables bulkhead cables external cables|Y
01|166831|5|3|parameter changes service time and travel.|Y
01|166832|20|1|REPLACES C40R5-0562-3.02|Y
01|166832|21|1|REPLACES C40R5-0875-3.66|Y
01|166833|1|1|Reference RGA# LVR-57551|Y
01|166833|1|2|Repair of 1x NK103-16000 s/n: AL0001|Y
01|166833|1|3|ALPS#NK103-16002|Y
01|166833|2|1|Bearings O-Rings Collet Nut and spindle to be|Y
01|166833|2|2|replaced. If spindle can be reused the cost will be|Y
01|166833|2|3|$1398.28|Y
01|166834|1|1|This item is discontinued once ordered cannot be|Y
01|166834|1|2|cancelled or returned.|Y
01|166845|1|1|Replaces part #HSK63A-SF0500-3.54|Y
01|166851|1|1|P/N: TBD   CAT40 AGH U-Type (-Z_OUTPUT); ER11;|Y
01|166851|1|2|L1=180mm; L=226mm External Coolant; 1/2 Gear Max 10Nm|Y
01|166851|1|3|Max Input 3750RPM; Max Output 7500RPM Ref Drwg#00054602|Y
01|166851|2|1|See above description - quantity 2|Y
01|166861|1|1|Take CNC180AA21 SN: 25957T and conver to Okuma|Y
01|166861|1|2|P300MA = OSP4 Specification|Y
01|166867|1|1|BT30-SF6-65|Y
01|166867|1|2|BT30 Shrink fit holder 6mm|Y
01|166867|2|1|BT30-SF6.5-65|Y
01|166867|2|2|BT30 Shrink fit holder 6.5mm|Y
01|166867|3|1|BT30-SF8-65|Y
01|166867|3|2|BT30 Shrink fit holder 8mm|Y
01|166867|4|1|BT30-SF8-120|Y
01|166867|4|2|BT30 Shrink fit holder 8mm|Y
01|166867|5|1|BT30-SF10-120|Y
01|166867|5|2|BT30 Shrink fit holder 10mm|Y
01|166867|6|1|BT30-SF13-120|Y
01|166867|6|2|BT30 Shrink fit holder 13mm|Y
01|166870|3|1|Installation includes: Drive unit short bar fiber|Y
01|166870|3|2|optic cable communications cable bulkhead cables|Y
01|166870|3|3|external cables service time and travel.|Y
01|166873|8|1|NBT30-SF1000-3.15CP|Y
01|166873|8|2|NBT30 Dual Contact Shrink Fit Holder 1 Coolant Ports|Y
01|166873|8|3|Special Order. Net Price Each.|Y
01|166883|1|1|Pricing reflects non-returnable Used/Demo Tool|Y
01|166894|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|166901|1|1|2-3 to convert to standard|Y
01|166903|1|1|4.25 riser for NCT200OSP4-M for M560-V|Y
01|166916|1|1|10% Eastec Promo added - valid thru 11/24/2021|Y
01|166921|3|1|***Alternative****|Y
01|166921|4|1|***Alternative****|Y
01|166921|4|2|**To be used w/CAT50-C2-125U-IDU|Y
01|166921|4|3|See Drawing via email***|Y
01|166921|4|4|Mach: Not for Erickson Quick Change.Offer 2p to|Y
01|166921|4|5|maximize operation.May need slight ADJ if any issue on|Y
01|166921|4|6|auto draw bar.|Y
01|166958|7|1|***If it's a Haas we quote PB-RAN40-HAAS-MODULAR***|Y
01|166958|8|1|***All other machines use MODIFICATION-PB-SP***|Y
01|166969|1|1|P/N: MZQT47-ER25Y-MD|Y
01|166974|1|1|part# S.MHA50-D8N|Y
01|166974|1|2|Quick Change Holder Standard Boxed Set|Y
01|166974|1|3|**NET PRICE**|Y
01|166974|6|1|MCT45-42|Y
01|166974|15|1|FT45-6 Face Mill Arbor|Y
01|166974|17|1|FT45-6|Y
01|166976|1|1|TAR-57359 5AX-2MT-105-120 S/n:8243|Y
01|166978|1|1|Dura Vertical 1035 eco//Mitsubishi M730BM|Y
01|166978|2|1|Include Hand Labor and Interface|Y
01|166978|5|1|DMG CMX1100 Fanuc Control|Y
01|166978|6|1|Include Hand Labor/ Change Cable from Cabinet to the RT|Y
01|166989|2|1|CAT40-HC20-80|Y
01|166989|2|2|Hydraulic Chuck CAT40 ID:20mm GL: 80mm|Y
01|166989|2|3|GEWEFA # 24.05.043.379|Y
01|166993|8|1|Extra 6% Disc all collets|Y
01|166993|35|1|Extra 6% Disc|Y
01|166993|43|1|Extra 12% Disc|Y
01|166993|44|1|Extra 2% Disc|Y
01|167018|1|1|Tooling Certificate Number: 19930-3052-092821|Y
01|167018|2|1|*complete set:  Base and Attachment|Y
01|167031|1|1|C6 PRO PACKAGE AXILE// HEIDENHAIN 640|Y
01|167031|1|2|Machine need have M Code free (4)|Y
01|167045|1|1|P/N: TBD CAT40 Fixed Angle Head; MI50 Output with 3 pin|Y
01|167045|1|2|support and internal coolant.|Y
01|167045|2|1|Same as above Quantity 2|Y
01|167065|1|1|1st Batch *Saved in Teams DWG File|Y
01|167065|2|1|1st Batch *Saved in Teams DWG File|Y
01|167065|3|1|1st Batch *Saved in Teams DWG File|Y
01|167065|4|1|1st Batch/895832 Buckeye/KTH *DWG @ Teams File|Y
01|167067|1|1|Modify CNC401FA-M to YA-M for Haas VF-11|Y
01|167067|1|2|SN: 11905|Y
01|167067|6|1|New Gearbox/Cover/Solenoid/Motor Gear|Y
01|167076|1|2|HYUNDAI KF4600//OI-PLUS Fanuc|Y
01|167076|2|1|2-3 Wks to prepare Interface|Y
01|167076|2|2|Need Send Data Sheet|Y
01|167082|1|1|Req. INS 885676Gosiger/Primetals 7/20/21:DWG Aprv'd/TR|Y
01|167084|6|1|***Alternate for out of stock part#HSK63A-ER20-5.00***|Y
01|167099|1|1|Includes Power and Feed Back Cables from Table to|Y
01|167099|1|2|Machine Bulkhead|Y
01|167099|1|3|Includes FacePlate|Y
01|167105|1|1|w/ chip BIS-C-122-04/L|Y
01|167105|3|1|w/ chip BIS-C-122-04/L|Y
01|167107|3|1|Alternative to the 1.1/4 side lock holder|Y
01|167107|6|1|Alternate for Hyd Chuck|Y
01|167107|9|1|Includes install and balance|Y
01|167107|9|2|Price for 1 to 4 Holders|Y
01|167107|10|1|Includes install and balance|Y
01|167107|10|2|Price is for 5 to 9 holders|Y
01|167107|11|1|Includes install and balance|Y
01|167107|11|2|price for 10 to 20 holders|Y
01|167107|12|1|includes install and balance|Y
01|167107|12|2|Price for 21+ Holders|Y
01|167119|1|1|H011MC10 U-739|Y
01|167119|1|2|(HW#:H011MC-10) 10 Drawdown Power chuck HOWA|Y
01|167125|2|1|** Machine needs to have Hyd interface package from OAC|Y
01|167128|1|1|1 unit Due in 11/1/2021 ETA|Y
01|167146|2|1|POLYGON C6 AGH 360DEG ADJ; ER20;|Y
01|167146|2|2|A=80mm; d=20mm;|Y
01|167146|2|3|L=196mm; L1=91mm;|Y
01|167146|2|4|NO REVERSAL OF ROTATION;|Y
01|167146|2|5|1:1 GEAR MAX 15Nm; 8000 RPM;|Y
01|167146|2|6|COOLANT SUPPLY THROUGH SPINDLE [70 PSI]|Y
01|167146|2|7|REF CONCEPT Drawing# 00023258|Y
01|167149|2|1|Hydraulic unit with solenoid pressure switch hose|Y
01|167149|2|2|with quick disconnects.|Y
01|167149|3|1|Installation includes: Dual axis drive short bar|Y
01|167149|3|2|fiber optic cables communications cables bulkhead|Y
01|167149|3|3|cables external cables parameter changes service|Y
01|167149|3|4|time and travel.|Y
01|167149|4|1|6-port 1000psi rotary union|Y
01|167160|1|1|CNC260FA-10+1|Y
01|167160|1|2|match s/n.13941  w/o  Direct mount Cable and Motor|Y
01|167160|1|3|with  special face plate|Y
01|167160|3|1|TCD-C4549 10+1p RJ  Built-In|Y
01|167161|1|1|Installation Fee for CNCZ321MA|Y
01|167161|1|2|Included Motor replacement / Test drive / Adjustment|Y
01|167168|1|1|qty (2) instock next available eta 12/8/2021|Y
01|167173|2|1|RFS-6.0-100L-OHS-EA3|Y
01|167173|2|2|Carbide Radical Mill reamer ST Shank|Y
01|167173|2|3|with Coolant Hole Total Length 100mm|Y
01|167173|6|1|RRS-6.0-100L-OH-EA3|Y
01|167173|6|2|Carbide Radical Mill reamer Right spiral ST Shank with|Y
01|167173|6|3|Coolant Hole Total Length 100mm|Y
01|167173|10|1|RRSS-6.0F-OH|Y
01|167173|10|2|Carbide Radical Mill reamer Right spiral Dia 6.0|Y
01|167173|10|3|Straight Shank with Coolant Hole|Y
01|167173|10|4|Min. Order Qty. : 1 - 4|Y
01|167173|14|1|RXS-6.0F|Y
01|167173|14|2|Carbide Mill reamer Right spiral Dia 6.0 ST Shank|Y
01|167181|2|1|Hydraulic unit with solenoid pressure switch hose|Y
01|167181|2|2|with quick disconnects.|Y
01|167181|3|1|Installation includes: Dual axis drive short bar|Y
01|167181|3|2|fiber optic cables communications cables bulkhead|Y
01|167181|3|3|cables external cables parameter changes service|Y
01|167181|3|4|time and travel.|Y
01|167181|4|1|6-port 1000psi rotary union|Y
01|167193|1|1|TAR-57493 5AX-130 s/n:5545|Y
01|167193|34|1|Freight charges for arranging pick up from customer's|Y
01|167193|34|2|facility|Y
01|167197|1|1|We have 3ea in stock currently|Y
01|167198|4|1|500psi pump for the brake system.|Y
01|167198|4|2|Pump max pressure 1000psi.|Y
01|167198|5|1|Small cone workholding trunnion.|Y
01|167198|5|2|Includes: Sub plate end caps and trunnion plate.|Y
01|167198|5|3|To be assembled prior to shipping.|Y
01|167223|2|1|Please note: Max pressure is 1000 PSI|Y
01|167223|3|1|Stallion 6/18 DBS Trunnion with a 6x18 working|Y
01|167223|3|2|surface. Guranteed flat and square within .001.|Y
01|167223|3|3|Outboard support with dual disk pneumatic clamping.|Y
01|167223|3|4|1.25 thick baseplate for assembly. All mounting|Y
01|167223|3|5|Hardware lines and fittings are included.|Y
01|167223|3|6|Drilled for Hydraulic/pneumatic Rotary Joint connection|Y
01|167226|1|1|NET PRICING; IF QUANTITIES CHANGE PRICE WILL CHANGE|Y
01|167230|1|1|Includes Haas Motors and Cables|Y
01|167235|1|1|Reference RGA# QUA-57301|Y
01|167235|1|2|Repair of 1 x MRAM-ER25L s/n:1990443202|Y
01|167235|1|3|(Mimatic# 162710)|Y
01|167235|2|1|Bearings Seals and O-Rings to be replaced.|Y
01|167235|2|2|Recondition 1 Output Spindle|Y
01|167262|23|1|21pcs Stock - 41pcs 6 weeks & bal 123pcs pending|Y
01|167268|1|1|part# S.MHA50-D8N|Y
01|167268|1|2|Quick Change Holder Standard Boxed Set|Y
01|167268|1|3|**NET PRICE**|Y
01|167268|4|1|Quick Change Type Multi-Lock Milling Chuck MCT45-42|Y
01|167268|5|1|FT45 Shell/Face Mill Holder 6mm|Y
01|167273|1|1|Pratt & Whitney Tool# PT457340/BIS-M-122-02/A Installed|Y
01|167273|1|2|4-pcs 2 Weeks/ Bal of 3-pcs Beg Feb 2022|Y
01|167282|1|1|CNCZ100-2W-120OSP3 SN: 9120|Y
01|167282|1|2|Recieved Table with overload alarm|Y
01|167282|1|3|Check brake system - works OK|Y
01|167282|1|4|Checked wiring and solenoid/switches - OK|Y
01|167282|1|5|Motor having overload - Replaced now working OK|Y
01|167282|1|6|Backlash was good as well (mechanical).|Y
01|167291|2|1|HSK63A-C32-150  HSK63A 32mm Milling Chuck|Y
01|167297|3|1|NC5-46-CLP(PS-123)-BD|Y
01|167297|3|2|Pull Force Meter Adapter BT40 w/PS-123-CLP-A|Y
01|167297|6|1|w/PS-132|Y
01|167297|8|1|w/PS-132|Y
01|167297|12|1|w/PS-1 (solid version of PS-73)|Y
01|167297|13|1|Solid version of PS-73|Y
01|167306|48|1|All items are considered specials and are not cancelabl|Y
01|167306|48|2|nor returnable once ordered|Y
01|167315|1|1|CAT50U-AF1-30-OH|Y
01|167315|1|2|CAT50 Automatic Back Spot Facing|Y
01|167315|2|1|BF130-31-46-60C|Y
01|167315|2|2|Arbor for Back Spot Facing|Y
01|167315|3|1|9BF130-31-46-60C-I|Y
01|167315|3|2|Byte for Back Spot Facing Arbor|Y
01|167315|3|3|Cantidad minima a pedir: 3 piezas|Y
01|167315|4|1|Cantidad minima a pedir: 10 piezas|Y
01|167316|2|1|Optional*|Y
01|167317|1|1|40 or 50 taper Unit - Price does not include install|Y
01|167317|1|2|and training.|Y
01|167317|2|1|40 or 50 Taper unit price does not include install|Y
01|167317|2|2|and training|Y
01|167328|1|1|REPLACEMENT FOR C40-TOOLJAW|Y
01|167331|1|1|5AX-201YA-M SN: 5340|Y
01|167341|1|1|Makerspace Demo Unit: Non-returnable - Discount Applied|Y
01|167341|2|1|New Stock - no demo version available|Y
01|167341|2|2|10% Eastec Promo applied|Y
01|167341|3|1|New Stock - no demo version available|Y
01|167341|3|2|10% Eastec Promo applied|Y
01|167341|4|1|Makerspace Demo Unit: Non-returnable - Discount Applied|Y
01|167341|5|1|Makerspace Demo Unit: Non-returnable - Discount Applied|Y
01|167341|6|1|New Stock - no demo version available|Y
01|167341|6|2|10% Eastec Promo Applied|Y
01|167346|2|1|Special junction box cable + sheet metal for TC-32B|Y
01|167355|1|1|Please order part # CAT50-SK25-165UP-IDU|Y
01|167355|1|2|'|N
01|167356|1|1|HSK50E 3/4 Shrink Fit Holder 3.15 GL|Y
01|167356|1|2|Order Part # H50E-SF0750-3.15|Y
01|167359|1|1|MOD-57567 CNC180FA S/N: 10611|Y
01|167385|1|1|Collet MMC4|Y
01|167389|6|1|Install and Training $1800.00 - No Charge|Y
01|167392|3|1|1-HP hydraulic pump 2-Four valve sub plates|Y
01|167392|3|2|2-valve sub plate mounting brackets 8-2way 3port valve|Y
01|167392|3|3|hydraulic hose and hardlines.|Y
01|167392|6|1|Multi-Purpose Subplate that supports bolt on or ball|Y
01|167392|6|2|loc systems. Ball Loc require additional plates|Y
01|167392|7|1|Northfield 5C-400 collet chucks|Y
01|167392|7|2|Includes: 5C-400 Hydraulic collet chuck feed tube|Y
01|167392|7|3|adapter plate support bushing and mounting.|Y
01|167399|5|1|Special Price for Quantity|Y
01|167403|1|1|Includes: NCAT40-SK16C-60U-IDU Collet Chuck 9HC16|Y
01|167403|1|2|Wrench 3/8 1/2 and 5/8 SK16 Collets.|Y
01|167406|1|1|50 Taper Tooling Cert|Y
01|167418|1|1|Includes Haas Motors and Cables.|Y
01|167418|2|1|Includes Haas Motors and Cables.|Y
01|167442|1|1|BMT65-ER25-AD-ICE|Y
01|167442|1|2|BMT65 ER25 Adj- ICE Live Tool|Y
01|167448|1|1|Please note: This does not have coolant ports.|Y
01|167453|1|1|14mm size due any day 18mm ETA pending|Y
01|167457|1|1|This item is a non-standard stock item. It's considered|Y
01|167457|1|2|special once ordered cannot be cancelled or returned.|Y
01|167492|1|1|TM Machine|Y
01|167495|1|1|This unit will be #30 Spindle (BT30)|Y
01|167495|12|1|Install and Training $1800.00 - No Charge|Y
01|167499|3|1|TRAVEL EXPENSES|Y
01|167499|4|1|ESTIMATE FOR PARTS NEEDED|Y
01|167501|1|1|Quoted at NET pricing.|Y
01|167501|1|2|Note: Item is a special once the purchase order is|Y
01|167501|1|3|received it can not be cancelled or returned.|Y
01|167501|1|4|Signed approval drawing needed if this becomes an order|Y
01|167503|1|1|1st Batch/887700 Greentec/Advics 7/28/21:DWG Aprv'd/Cus|Y
01|167503|2|1|Req. INS/REPEAT 891180 Trinity-Mill/GKN-NY|Y
01|167503|3|1|Req.INS/Inartall E16-NUT & ER16-SCREW(C)|Y
01|167503|4|1|Req.INS/Inartall E20-NUT & ER20-SCREW(C)|Y
01|167503|5|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|167503|6|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|167503|7|1|Req.INS/Ref.NCR260-1|Y
01|167503|8|1|Req.INS/Ref.NCR260-1|Y
01|167503|9|1|1st Batch/Install E32-NUT & ER32-SCREW(C)|Y
01|167503|10|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|167507|5|1|One of Pots comes with unit|Y
01|167507|10|1|Item added for pricing at normal discount*|Y
01|167507|11|1|Item added for pricing at normal discount*|Y
01|167526|1|1|TAR-57577|Y
01|167526|1|2|CNC200|Y
01|167526|1|3|SN:3232|Y
01|167529|1|1|Customer PO by 12/10/21 the following is the ETA:|Y
01|167529|1|2|25 pieces in Stock at Nikken; 110 are in Production|Y
01|167529|1|3|Balance of new lot Mid to End February'22|Y
01|167529|11|1|13 pieces in production; new lot Mid to End Feburary'22|Y
01|167538|1|1|CAPTO C8 AGH;adaptation of the lock pin;|Y
01|167538|1|2|A=98.425mm;L=263mm;1:1 gEAR MAX 4000 RPM; 220Nm;|Y
01|167538|1|3|NO COOLANT|Y
01|167538|1|4|REF DRWG # 00058138|Y
01|167538|1|5|MIM QUOTE# A21100703|N
01|167541|1|1|Tooling Certificate Number:For PO PF11027 3 Rotary Tbls|Y
01|167541|2|1|Tooling Certificate Number:PO PF10746 (For 2 Rotary Tbl|Y
01|167546|1|1|Item can not be cancelled or returned.|Y
01|167547|2|1|Asked for non CP.I think these are plugged.If not we|Y
01|167547|2|2|should be able to plug them|Y
01|167552|2|1|*special. cannot be returned or cancelled|Y
01|167581|4|1|Valid until 11/24|Y
01|167583|1|1|M560V OKUMA|Y
01|167583|1|2|1 YEAR WARRANTY|Y
01|167583|4|1|1 YEAR WARRANTY|Y
01|167583|5|1|78045 at Cargoquin //Laredo TX|Y
01|167583|5|2|2 skid //48 x 40 x 48// 900 lbs|Y
01|167587|1|1|Qty 100-499|Y
01|167587|2|1|Qty 500+|Y
01|167587|3|1|Qty 100-499|Y
01|167587|4|1|Qty 500+|Y
01|167588|1|1|Qty 1-4|Y
01|167588|2|1|Qty 5-9|Y
01|167588|3|1|Qty 10+pc|Y
01|167599|1|1|This unit will be #30 Spindle (BT30)|Y
01|167599|12|1|Install and Training $3600.00 - No Charge|Y
01|167600|7|1|Presetter Install and Training $1800.00 - No Charge|Y
01|167601|7|1|Presetter Install and Training $3600.00 - No Charge|Y
01|167611|1|1|Reference RGA# LVR-57550|Y
01|167611|1|2|Repair of MNL12-ER32Z-MS s/n: A1872 (Alps# T32216)|Y
01|167611|2|1|Bearing o-rings collet nuts spindles and gears to be|Y
01|167611|2|2|replaced.|Y
01|167611|4|1|Repair of MNL12-ER32Z-MS s/n: A1999 (Alps# T32216)|Y
01|167611|5|1|Bearing o-rings collet nuts spindles and gears to be|Y
01|167611|5|2|replaced.|Y
01|167619|7|1|B3007-0032-3.00 LLAVE|Y
01|167619|7|3|E|N
01|167619|8|1|E20-EXT-750 Llave|Y
01|167630|2|1|RFS-6.0-100L-OHS-EA3|Y
01|167630|2|2|Carbide Radical Mill reamer Right spiral ST Shank|Y
01|167630|2|3|with Coolant Hole Total Length 100mm|Y
01|167630|6|1|RRSS-6.0F-OH|Y
01|167630|6|2|Carbide Radical Mill reamer Right spiral Dia 6.0|Y
01|167630|6|3|Straight Shank with Coolant Hole|Y
01|167630|6|4|Min. Order Qty. : 1 - 4|Y
01|167630|10|1|RXS-6.0F|Y
01|167630|10|2|Carbide Mill reamer Right spiral Dia 6.0 ST Shank|Y
01|167636|1|1|EXTRA 3%|Y
01|167650|1|1|Quoted at NET pricing.|Y
01|167650|1|2|Note: Item is a special once the purchase order is|Y
01|167650|1|3|received it can not be cancelled or returned.|Y
01|167650|1|4|Signed approval drawing needed if this becomes an order|Y
01|167670|3|1|Included with purchase of Start2 or Fi6 Shrink Machines|Y
01|167687|4|1|MI50-SM25|Y
01|167702|4|1|Part#OKEX-SK20Z-MS|Y
01|167705|8|1|Installation & Training $1800.00 - No Charge|Y
01|167705|9|1|**Qualified to Receive 10% Discount(Southtec Special)**|Y
01|167713|5|1|Confirmation Switches and Cover. Ellison will need to|Y
01|167713|5|2|integrate the Confirmation and Hi/Low pressure on the|Y
01|167713|5|3|Tailstocks.|Y
01|167713|6|1|2 Piece Steel Black Oxided Sub Plates|Y
01|167713|6|2|**Budgetary Price prior to final approved design.|Y
01|167713|7|1|Ellison to mount Rotary/Tailsock/Sub Plate Assembly|Y
01|167713|7|2|Lyndex-Nikken to perform Installation to machine contro|Y
01|167733|7|1|Laredo 78045|Y
01|167743|1|1|Please Note: CAT50U-NX4-192 is non standard stock.|Y
01|167743|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|167743|1|3|or returned.|Y
01|167750|1|1|Reference RGA# LVR-57570|Y
01|167750|1|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 19903686 12|Y
01|167750|1|3|(Mimatic# 193643)|Y
01|167750|2|1|Bearings seals o-rings to be replaced. Reconditioning|Y
01|167750|2|2|1 output spindle.|Y
01|167750|4|1|Repair of MNZ20-SK16Z-12K s/n: 19904122 06|Y
01|167750|4|2|(Mimatic# 196235)|Y
01|167750|5|1|Bearings seals o-rings to be replaced. Reconditioning|Y
01|167750|5|2|1 output spindle.|Y
01|167760|1|1|RAH Version of Hathor Six|Y
01|167800|1|1|1st Batch/Install E11-NUT/ER11-SCREW(C)6/9/21:DWG Aprvd|Y
01|167835|1|1|C6-45-TH20L-100|Y
01|167835|2|1|C6-180-TH20R-100|Y
01|167835|3|1|C6-180-TH20L-100|Y
01|167835|4|1|C6-SLT8-70|Y
01|167835|5|1|C6-SLT10-70|Y
01|167835|6|1|C6-SLT12-80|Y
01|167835|7|1|C6-SLT16-90|Y
01|167835|8|1|C6-SL20C-70|Y
01|167835|9|1|C6-45-TH20R-100|Y
01|167835|10|1|C6-SL25C-70|Y
01|167835|11|1|S.TS-NZL(M6)|Y
01|167835|12|1|S.TS-NZL(M8)|Y
01|167844|1|1|TAR-57493 5AX-130 s/n:5545|Y
01|167844|34|1|Freight charges for arranging pick up from customer's|Y
01|167844|34|2|facility|Y
01|167875|1|1|1st Batch/(1)862921 (4)864589 12/10/20:DWG Approved.|Y
01|167875|2|1|1st Batch/For Stock *DWG Approved on 2/1/21|Y
01|167875|3|1|1st Batch/(2)872651 Marvin 2/24/21: DWG Approved.|Y
01|167875|4|1|1st Batch/Give to Tim for INS  DWG:Still pending 6/10|Y
01|167886|2|1|This is the same table with an upgraded brake|Y
01|167886|2|2|wchich is more powerful and faster|Y
01|167886|3|1|This Face Plate is only required with the NCT|Y
01|167886|3|2|Rotary Table|Y
01|167890|1|1|1st Batch/Stock|Y
01|167920|13|1|Installation & Training $1800.00 - No Charge|Y
01|167920|14|1|**Qualified to Receive 10% Discount(Southtec Special)**|Y
01|167941|4|1|This item is considered special once an order is|Y
01|167941|4|2|placed it cannot be cancelled or returned.|Y
01|167951|1|1|JPY290000/net ea($1=JPY100)|Y
01|167951|2|1|JPY45800/net ea($1=JPY100)|Y
01|167952|1|1|Part Number To Be Determined|Y
01|167952|1|2|Special 3-jaw big hollow power chuck H3KB10 O-XXXX for|Y
01|167952|1|3|D1-6|Y
01|167959|1|1|Reference RGA# QUA-57289|Y
01|167959|1|2|Repair of BMT55-SK20X-ICE s/n: 92011 04|Y
01|167959|1|3|(Mimatic# 187162)|Y
01|167959|2|1|Bearings seals o-rings and damaged spindle to be|Y
01|167959|2|2|replaced.|Y
01|167961|1|1|SP Cable Cover for  CNC180LFA S/N14433|Y
01|167961|1|2|Width 80mm  Powder Color Black|Y
01|167961|2|1|TCE-95945-3150R Power Cable 3.15m|Y
01|167961|2|2|TCE-95949-3150R Feedback Cable 3.15m|Y
01|167961|3|1|TCE-95945-2300R  Ext Power Cable R-Axis 2.3M ST-ST BLK|Y
01|167961|3|2|TCE-95949-2300R  Ext FeedBack Cable R-Axis 2.3M ST-ST|Y
01|167962|1|1|TCD-37633-R/1|Y
01|167962|1|2|for TAT-170/SN#10162-B|Y
01|167977|1|1|We have 18 units in stock|Y
01|168015|1|1|Draw nut supplied w/out thread Threading available for|Y
01|168015|1|2|an additional fee|Y
01|168022|1|1|MIM#197599|Y
01|168022|2|1|MIM#197601|Y
01|168025|2|1|Installation includes: Drive unit short bar fiber|Y
01|168025|2|2|optic cable communications cable bulkhead cables|Y
01|168025|2|3|external cables parameter changes service time and|Y
01|168025|2|4|travel.|Y
01|168027|1|1|Min. Order Qty. : 1-4|Y
01|168030|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|168031|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|168032|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|168033|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|168034|2|1|Interface FANUC|Y
01|168036|1|1|*Optional HYD-UNIT-NACHI available for Hydraulic|Y
01|168036|1|2|Braking.|Y
01|168036|2|1|*Requires a HYD-UNIT-NACHI Hydraulic Unit for Braking.|Y
01|168041|5|1|Lyndex-Nikken to make position block upon confirmation|Y
01|168041|5|2|of spindle drawing|Y
01|168046|1|1|HSK63A-MMC8C-175-AA|Y
01|168049|1|1|Reference RGA# LVR-57252|Y
01|168049|1|2|Repair of T32336 s/n: Unknown|Y
01|168049|2|1|Bearings o-rings collet nuts spindle and gears to be|Y
01|168049|2|2|replaced.|Y
01|168058|21|1|Please note: KM1-4 is considered Special. Once|Y
01|168058|21|2|a purchase order is placed it cannot be cancelled|Y
01|168058|21|3|or rturned.|Y
01|168074|1|1|w/o motor and direct mount cable.|Y
01|168074|1|2|R/Joint 8+1p built-in. Special Modification Cost|Y
01|168074|1|3|Included. After PO 2mth mfg + Shipping 2.5mth.|Y
01|168077|5|1|SKG-15|Y
01|168077|5|2|SK13 back up screw|Y
01|168082|1|1|Reference RGA# 57573|Y
01|168082|1|2|Repair of C50-MRAM-IC s/n: 94386-03 (Mimatic#162817)and|Y
01|168082|1|3|PA110-CAT (Mimatic# 162745)|Y
01|168082|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|168082|2|2|1 spindle.|Y
01|168082|4|1|Repair of MRAM-ER25-IC s/n: 19904433 02|Y
01|168082|4|2|(Mimatic# 162765)|Y
01|168082|5|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|168082|5|2|1 output spindle.|Y
01|168082|7|1|Repair of MRAM-EXT-1000 s/n: 19906335-04|Y
01|168082|7|2|(Mimatic# 162758)|Y
01|168082|8|1|Bearings seals and o-rings to be replaced.|Y
01|168108|1|1|Please Note: CAT50U-NX4-192 is non standard stock.|Y
01|168108|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|168108|1|3|or returned.|Y
01|168115|2|1|includes: Drive unit short bar fiber optic cables|Y
01|168115|2|2|communications cables external cables parameter|Y
01|168115|2|3|changes service time and travel.|Y
01|168122|1|1|C6-45-TH20L-100|Y
01|168122|2|1|C6-180-TH20R-100|Y
01|168122|3|1|C6-180-TH20L-100|Y
01|168122|4|1|C6-SLT8-70|Y
01|168122|5|1|C6-SLT10-70|Y
01|168122|6|1|C6-SLT12-80|Y
01|168122|7|1|C6-SLT16-90|Y
01|168122|8|1|C6-SL20C-70|Y
01|168122|9|1|C6-45-TH20R-100|Y
01|168122|10|1|C6-SL25C-70|Y
01|168122|11|1|S.TS-NZL(M6)|Y
01|168122|12|1|S.TS-NZL(M8)|Y
01|168124|12|1|PMK8-2|Y
01|168124|12|2|MMC8/VMC8 Collet 1.8-2.0mm|Y
01|168124|21|1|ST3/4-SK10-141|Y
01|168124|21|2|3/4 STR EXT SK10 Slim Chuck CNC Auto Lathe|Y
01|168128|1|1|1st Batch/For stock 11/3/21:DWG Saved in Teams File|Y
01|168128|2|1|1st Batch/For stock *DWG saved in Teams/File|Y
01|168128|3|1|1st Bath *DWG saved Teams File|Y
01|168139|1|1|Reference RGA# QUA-57631|Y
01|168139|1|2|Repair of MZQT47-ER25X-OFF-HS-ICE s/n: 93945 02|Y
01|168139|1|3|(Mimatic# 100277)|Y
01|168139|2|1|Bearings seals and o-rings to be replaced.|Y
01|168156|5|1|Signed approval drawing maybe be required if ordered|Y
01|168160|1|1|Howa Chuck H09M9 O-1836|Y
01|168160|1|2|This is a non-standard stock item considered special.|Y
01|168160|1|3|Once a PO has been issued this item cannot be|Y
01|168160|1|4|cancelled nor returned.|Y
01|168192|1|1|New Price $492.00 list|Y
01|168192|2|1|New Price $28.00 list|Y
01|168192|3|1|New Price $316.00 list|Y
01|168192|4|1|New Price $1252.00 list.|Y
01|168192|5|1|New Price $76.00 list.|Y
01|168192|6|1|New Price $63.00 list.|Y
01|168192|7|1|New Price $63.00 list.|Y
01|168192|8|1|New Price $63.00 list.|Y
01|168192|9|1|New Price $63.00 list.|Y
01|168192|10|1|New Price $63.00 list.|Y
01|168192|11|1|New Price $63.00 list.|Y
01|168194|1|1|List price $383.00 list 01/01/2022|Y
01|168194|2|1|List price $447.00 list 01/01/2022|Y
01|168194|3|1|List price $693.00 list 01/01/2022|Y
01|168194|4|1|List price $77.00 list 01/01/2022.|Y
01|168194|5|1|List price $77.00 list 01/01/2022.|Y
01|168194|6|1|List price $77.00 list 01/01/2022.|Y
01|168194|7|1|List price $77.00 list 01/01/2022.|Y
01|168194|8|1|List price $77.00 list 01/01/2022.|Y
01|168194|9|1|List price $77.00 list 01/01/2022.|Y
01|168215|1|1|Tooling Certificate Number: 5410-2904-031621|Y
01|168216|1|1|1x in stock additional pieces would be 6 weeks|Y
01|168220|1|1|ALPS Part#NK103-5S000 / Cross Offset Holder|Y
01|168222|2|1|In stock option in 6 GL|Y
01|168236|4|1|This item is considered special once an order is|Y
01|168236|4|2|placed it cannot be cancelled or returned.|Y
01|168252|1|1|Calibration Service for 68B ISO150 s/n: PS-37149-00|Y
01|168252|1|2|This is a time based estimate.|Y
01|168252|1|3|Also any expenses such as hotel airfare car rental|Y
01|168252|1|4|meals gas/parking costs to be charged as needed.|Y
01|168252|1|5|We will invoice the actual amount after the service|Y
01|168252|1|6|call is complete.|Y
01|168253|21|1|takes standard spanner wrench|Y
01|168258|3|1|11350 James Watt DR  El Paso tx  79936|Y
01|168262|14|1|NCAT40-SF0437-3.15CP CAT40 Shrink Fit Holder 7/16|Y
01|168262|22|1|NCAT40-SF3-80|Y
01|168262|22|2|NCAT40 Dual Contact Shrink Fit Holder 3mm|Y
01|168262|24|1|NCAT40-SF4-80 CAT40 Shrink Fit Holder 4mm|Y
01|168262|24|2|Taper Plus|Y
01|168262|28|1|NCAT40-SF10-160CP|Y
01|168262|28|2|NCAT40 Dual Contact Shrink Fit Holder 10mm Coolant Port|Y
01|168262|32|1|NCAT40-SF16-160CP|Y
01|168262|32|2|NCAT40 Dual Contact Shrink Fit Holder 16mm Coolant Port|Y
01|168263|5|1|Installation and Training $1800.00 No Charge|Y
01|168263|12|1|Installation and Training|Y
01|168281|4|1|9UNTC100-PLB40|Y
01|168281|4|2|Taper cleaner connection Pull bolt for BT40|Y
01|168281|5|1|9UNTC100-PLB50A|Y
01|168281|5|2|Taper cleaner connection Pull bolt for BT50|Y
01|168281|9|1|Refurbrished Taper Cleaner. Only 1 unit available.|Y
01|168281|10|1|This product for power supply 100V.|Y
01|168281|10|2|A converter is required to use this product.|Y
01|168281|15|1|This product for power supply 100V.|Y
01|168281|15|2|A converter is required to use this product.|Y
01|168288|1|1|Reference RGA# TOR-57634|Y
01|168288|1|2|Repair of PF-2|Y
01|168288|2|1|Clibration service included.|Y
01|168291|1|1|3 to 4 weeks delivery after we receive the PO|Y
01|168300|5|1|Customer will make their own positioning block|Y
01|168301|1|1|NB4001-1000-4.00CP|Y
01|168301|2|1|NB4007-0016-4.00G|Y
01|168301|23|1|NB4006-0750-4.00CP|Y
01|168301|23|2|NBT40 Dual Contact End Mill Holder 3/4|Y
01|168301|25|1|NB4006-0375-4.00-CP|Y
01|168301|25|2|NBT40 Dual Contact End Mill Holder 3/8 Coolant Ports|Y
01|168301|26|1|NB4006-0250-4.00CP|Y
01|168301|26|2|NBT40 Dual Contact End Mill Holder 1/4 Coolant Ports|Y
01|168301|27|1|NB4006-0187-4.00CP|Y
01|168301|27|2|NBT40 Dual Contact End Mill Holder 3/16 Coolant Ports|Y
01|168301|28|1|NB4006-0125-4.00CP|Y
01|168301|28|2|NBT40 Dual Contact End Mill Holder 1/8 Coolant Ports|Y
01|168301|29|1|NB4006-0500-2.00CP|Y
01|168301|29|2|NBT40 Dual Contact End Mill Holder 1/2 Coolant Ports|Y
01|168301|30|1|NB4006-0375-2.00CP|Y
01|168301|30|2|NBT40 Dual Contact End Mill Holder 3/8 Coolant Ports|Y
01|168301|31|1|NB4006-0312-2.00CP|Y
01|168301|31|2|NBT40 Dual Contact End Mill Holder 5/16 Coolant Ports|Y
01|168301|32|1|NB4006-0250-2.00CP|Y
01|168301|32|2|NBT40 Dual Contact End Mill Holder 1/4 Coolant Ports|Y
01|168301|33|1|NB4006-0187-2.00CP|Y
01|168301|33|2|NBT40 Dual Contact End Mill Holder 3/16 Coolant Ports|Y
01|168301|34|1|NB4006-0125-2.00CP|Y
01|168301|34|2|NBT40 Dual Contact End Mill Holder 1/8 Coolant Ports|Y
01|168304|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|168317|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|168349|1|1|3 to 4 weeks delivery after receipt of PO|Y
01|168354|2|1|C5017-0750-5.50 has been discontinued.|Y
01|168366|1|1|Tooling Certificate Number: E1094-2718-072220|Y
01|168370|1|1|This item is considered special once ordered it cannot|Y
01|168370|1|2|be cancelled or returned.|Y
01|168376|1|1|6-8 WEEKS FOR DELIVERY; WILL NEED TO ORDER MITS|Y
01|168376|1|2|MOTOR COVERS TO MATCH MACHINE.|Y
01|168376|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|168389|3|1|Installation includes: Bulkhead cables external cables|Y
01|168389|3|2|parameter changes service time and travel.|Y
01|168391|1|1|Reference RGA# LVR-57645|Y
01|168391|1|2|Repair of MZST68-ER32X-ICE s/n: 19903593 02|Y
01|168391|1|3|(Mimatic# 174674)|Y
01|168391|2|1|Bearings seals o-rings and damaged spindle to be|Y
01|168391|2|2|replaced.|Y
01|168397|1|1|B/O until 12/1 week|Y
01|168397|2|1|Scott will see if this can work for them.They need an|Y
01|168397|2|2|overnight delv|Y
01|168403|1|1|we have (2) 30 Taper units in stock. We will change|Y
01|168403|1|2|to a 40 taper spindle and ship.|Y
01|168403|5|1|Standard Installation and Training is $1500.00 Net|Y
01|168403|5|2|Installation and Training for this order is $750.00 net|Y
01|168412|1|1|3 to 4 weeks delivery once receipt of PO|Y
01|168431|1|1|#0-9/16 Hand Tap - 1/8 Pipe Tap - System #1|Y
01|168432|1|1|Special Power & Feed Back Cable Set.|Y
01|168432|1|2|Length 2100mm.|Y
01|168432|1|3|One side connector should be a male/elbow cable|Y
01|168432|1|4|And the other side Female wall mount Straight .|Y
01|168439|1|1|Okuma Live ER25 X-Axis Main Sub Spindle pitch 160mm|Y
01|168439|3|1|Okuma Live ER25 X-Axis Main Sub Spindle pitch 160mm|Y
01|168441|5|1|Item is non-standard stock once a purchase order|Y
01|168441|5|2|is recieved it can not be cancelled or returned|Y
01|168450|1|1|Order part # C4007-0040-5.00DIN-M|Y
01|168450|1|2|Once ordered cannot be cancelled or returned|Y
01|168450|2|1|Once ordered cannot be cancelled or returned|Y
01|168450|3|1|Plese order part # C4007-0025-4.00DIN-M|Y
01|168450|3|2|Once ordered cannot be cancelled or returned.|Y
01|168450|4|1|Once ordered cannot be cancelled or returned|Y
01|168450|5|1|Please order part # C4007-0032-3.13DIN-M|Y
01|168450|5|2|Once ordered cannot be cancelled or returned|Y
01|168450|8|1|Please order part # CAT40-ER32-2.76DIN-M|Y
01|168450|9|1|Please order part # CAT40-ER25-4.00DIN-M|Y
01|168450|10|1|Please order part # CAT40-ER32-4.00DIN-M|Y
01|168450|11|1|Please order part # CAT40-ER20-4.00DIN-M|Y
01|168459|1|1|NB4001-1000-4.00CP|Y
01|168459|2|1|NB4007-0016-4.00G|Y
01|168459|23|1|NB4006-0750-4.00CP|Y
01|168459|23|2|NBT40 Dual Contact End Mill Holder 3/4|Y
01|168459|25|1|NB4006-0375-4.00-CP|Y
01|168459|25|2|NBT40 Dual Contact End Mill Holder 3/8 Coolant Ports|Y
01|168459|26|1|NB4006-0250-4.00CP|Y
01|168459|26|2|NBT40 Dual Contact End Mill Holder 1/4 Coolant Ports|Y
01|168459|27|1|NB4006-0187-4.00CP|Y
01|168459|27|2|NBT40 Dual Contact End Mill Holder 3/16 Coolant Ports|Y
01|168459|28|1|NB4006-0125-4.00CP|Y
01|168459|28|2|NBT40 Dual Contact End Mill Holder 1/8 Coolant Ports|Y
01|168459|29|1|NB4006-0500-2.00CP|Y
01|168459|29|2|NBT40 Dual Contact End Mill Holder 1/2 Coolant Ports|Y
01|168459|30|1|NB4006-0375-2.00CP|Y
01|168459|30|2|NBT40 Dual Contact End Mill Holder 3/8 Coolant Ports|Y
01|168459|31|1|NB4006-0312-2.00CP|Y
01|168459|31|2|NBT40 Dual Contact End Mill Holder 5/16 Coolant Ports|Y
01|168459|32|1|NB4006-0250-2.00CP|Y
01|168459|32|2|NBT40 Dual Contact End Mill Holder 1/4 Coolant Ports|Y
01|168459|33|1|NB4006-0187-2.00CP|Y
01|168459|33|2|NBT40 Dual Contact End Mill Holder 3/16 Coolant Ports|Y
01|168459|34|1|NB4006-0125-2.00CP|Y
01|168459|34|2|NBT40 Dual Contact End Mill Holder 1/8 Coolant Ports|Y
01|168463|2|1|HAND LABOR AND INTERFACE|Y
01|168464|2|1|INTERFACE FANUC|Y
01|168466|2|1|A2-6 adapter plate for HW-12BB-KS/HW-12BB-KS2|Y
01|168466|5|1|A2-6 adapter plate for HW-12BB-KS/HW-12BB-KS2|Y
01|168466|5|2|Standard Service|Y
01|168466|6|1|A2-6 adapter plate for HW-12BB-KS/HW-12BB-KS2|Y
01|168466|6|2|Expedite Option|Y
01|168473|1|1|Discount based on quantity quoted.|Y
01|168475|1|1|CF-32 Nikken Product|Y
01|168475|1|2|Item is a special and non cancelable nor returnable|Y
01|168475|2|1|CF-42 Nikken Product|Y
01|168475|2|2|Item is a special and non cancelable nor returnable|Y
01|168475|3|1|CF-CZF32 Nikken Product|Y
01|168475|3|2|Item is a special and non cancelable nor returnable|Y
01|168475|4|1|CF-CZF42 Nikken Product|Y
01|168475|4|2|Item is a special and non cancelable nor returnable|Y
01|168476|13|1|Installation & Training $1800.00 - No Charge|Y
01|168476|14|1|**Qualified to Receive 10% Discount(Southtec Special)**|Y
01|168489|1|1|we have (2) 30 Taper units in stock. We will change|Y
01|168489|1|2|to a 40 taper spindle and ship.|Y
01|168489|5|1|Standard Installation and Training is $1500.00 Net|Y
01|168489|5|2|Installation and Training for this order is $750.00 net|Y
01|168493|3|1|2 Mounting Brackets for collet closer switches|Y
01|168493|4|1|2 Brackets for tailstock switches|Y
01|168509|2|1|Hradware and Hand Labor for Fanuc Interface|Y
01|168515|1|1|Tooling Certificate Number: 7585-3020-072321|Y
01|168548|1|1|INCLUDES FOLLOWING:|Y
01|168548|1|2|CNCZ105FA-M|Y
01|168548|1|3|TCE-95947-2000R|Y
01|168548|1|4|TCE-95951-2000R|Y
01|168548|1|5|AIR-LINE-KIT-MMT-CNC|Y
01|168590|1|1|Includes: Table with hardwired external cables drive|Y
01|168590|1|2|units cabinet cables set.|Y
01|168590|1|3|DOES NOT INLCUDE SHEET METAL OR JUNCTION BOX. NO TOOL|Y
01|168590|1|4|CERT INCLUDED.|Y
01|168609|6|1|MIM#197599|Y
01|168609|7|1|MIM#197601|Y
01|168630|1|1|Item is considered a special and will not be cancelable|Y
01|168630|1|2|nor returnable once the order is placed to the factory|Y
01|168630|1|3|Lead time will begin once approval drawing is signed|Y
01|168630|1|4|Price shown is NET ea with no additional discount|Y
01|168630|2|1|Item is considered a special and will not be cancelable|Y
01|168630|2|2|nor returnable once the order is placed to the factory|Y
01|168630|2|3|Lead time will begin once approval drawing is signed|Y
01|168630|2|4|Price shown is NET ea with no additional discount|Y
01|168635|1|1|Mimatic 188953|Y
01|168645|1|1|DIN Flange Coolant Is Required On Both HOlders***|Y
01|168645|2|1|DIN Flange Coolant Is Required On Both HOlders***|Y
01|168646|8|1|JM31109HTHS Match|Y
01|168651|2|1|CUSTOMER ALREADY HAS POSITIONING BLOCK FOR MAZAK|Y
01|168651|2|2|THIS BLOCK WILL BE FOR DMG MORI CMX1100V|Y
01|168654|2|1|Shank Dia. Range: 1.75-10mm Max RPM: 20000 SK10Collet|Y
01|168654|3|1|CAT40U-PX6-150GXf|Y
01|168654|3|2|CAT40 SPDL Speeder Shank Dia. Range: 0.5-8.0mm|Y
01|168654|3|3|Max. RPM: 30000|Y
01|168654|4|1|CAT40U-PX10-160GX|Y
01|168654|4|2|CAT40 SPDL Speeder Shank Dia. Range: 0.5-8.0mm|Y
01|168654|4|3|Max. RPM: 40000|Y
01|168654|7|1|CAT40U-HTS1500-148|Y
01|168654|7|2|CAT40 Air Turbin Spindle tool Shank Dia. Range: 0.5-4mm|Y
01|168654|7|3|Max RPM: 150000|Y
01|168654|8|1|AL-M1202|Y
01|168654|8|2|Air Line Kit (Manual) for Air Turbine Spindle|Y
01|168654|9|1|AL-M1203BS2|Y
01|168654|9|2|Air Line Kit (Automatic DC24V) for Air Turbine spindle|Y
01|168687|1|1|Req.INS/Install E40-NUT-G & ER40-SCREW(C)|Y
01|168687|2|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|168687|3|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|168687|4|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|168687|5|1|Req.INS/Install E11-NUT & ER11-SCREW(C)|Y
01|168687|6|1|Req.INS/Install E32-NUT-G & ER32-SCREW(C)|Y
01|168687|7|1|Req.INS/Install E32-NUT-G & ER32-SCREW(C)|Y
01|168687|8|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|168687|9|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|168687|10|1|Req.INS/Inartall E20-NUT & ER20-SCREW(C)|Y
01|168687|11|1|1st Batch/Install E16-NUT & ER16-SCREW(C)|Y
01|168691|1|1|No INS needed/Cheersun AIR#11172101-A|N
01|168691|2|1|No INS needed/Cheersun AIR#11172101-A|N
01|168691|3|1|No INS needed/Cheersun AIR#11172101-A|N
01|168691|4|1|No INS needed/Cheersun AIR#11172101-A|N
01|168691|5|1|No INS needed/Cheersun AIR#11172101-A|N
01|168692|2|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|168692|2|2|of spindle drawing information|Y
01|168695|1|1|Give 1p to SVC for INS|Y
01|168695|2|1|Give 1p to SVC for INS|Y
01|168695|3|1|Give 1p to SVC for INS|Y
01|168695|4|1|Give 1p to SVC for INS|Y
01|168695|5|1|INS/889180 Buckeye/American Showa|Y
01|168711|1|1|QCV40 ER40 HOLDER|Y
01|168712|1|1|Option 1|Y
01|168712|2|1|Option 2|Y
01|168714|1|1|Tooling Certificate Number: 15170-3112-111721|Y
01|168731|6|1|2500 PSI 6 Port Rotary Union|Y
01|168738|1|1|3 in stock il IL 3-4 wks for remaining pieces|Y
01|168765|1|1|Reference RGA# LVR-57676|Y
01|168765|1|2|Repair of NK103-12000 s/n: AL0033 (Alps# NK103-12002)|Y
01|168765|2|1|Bearings o-rings collect nut and spindle to be|Y
01|168765|2|2|replaced.|Y
01|168787|1|1|1st Batch|Y
01|168789|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|168789|3|1|40mm Riser Plate for Atlas 5C Closer|Y
01|168799|4|1|P/N: NBT40-SZF10C-120|Y
01|168828|1|1|P/N: H63A-SF0250-3.15MT|Y
01|168828|1|2|HSK63A 1/4 Shrink Fit holder w 3.15 gauge length|Y
01|168828|1|3|Mold Type|Y
01|168828|2|1|P/N: H63A-SF0500-6.30MT|Y
01|168828|2|2|HSK63A 1/2 Shrink Fit holder w 6.30 gauge length|Y
01|168828|2|3|Mold type|Y
01|168829|1|1|Tooling Certificate Number: 8425-2885-022621RT|Y
01|168833|1|1|ref# H037M10|Y
01|168833|1|2|Includes: Std. Soft Jaws with bolts hex wrench|Y
01|168833|1|3|**draw nut is blank|Y
01|168863|4|1|HSK63A-Shrink Fit holder 3/166.30GL|Y
01|168885|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|168888|1|1|New Price effective Jan 1st $9600.00 list.|Y
01|168892|1|1|5AX-500FA-APC SN: 1113|Y
01|168892|1|2|Tilt Axis Tool Crash - Tilt Axis needed rebuild|Y
01|168926|1|1|Item in stock at factory|Y
01|168937|15|1|Installation Fees for BIS-C-122-11/L  are as follows:|Y
01|168937|15|2|1 to 4: $120.00 Net each|Y
01|168937|15|3|5 to 9: $100.00 Net each|Y
01|168937|15|4|10 to 20: $75.00 Net each|Y
01|168937|15|5|21+ $65.00 Net each|Y
01|168937|15|6|The pricing includes ID chip hole installation of chip|Y
01|168937|15|7|and re-balancing of holders.|Y
01|168937|15|8|This pricing doesn't include the cost of the ID Chip.|Y
01|168946|1|1|Mimatic part # 125107|Y
01|168946|1|2|Please order Lyndex Nikken Part# MZQT47-SB10X-GH132|Y
01|168946|2|1|Mimatic part # 125107|Y
01|168946|2|2|Please order Lyndex Nikken Part# MZQT47-SB10X-GH132|Y
01|168946|3|1|Mimatic part # 125107|Y
01|168946|3|2|Please order Lyndex Nikken Part# MZQT47-SB10X-GH132|Y
01|168973|2|1|Quoted as an in stock option. Solid nut vs bearing nut|Y
01|168973|2|2|requested.|Y
01|168974|1|1|Used Live Tool with minimum use. (6)Six month Warranty.|Y
01|168985|2|1|These are included with the Start II shrink fit|Y
01|168985|2|2|machine at no charge.|Y
01|168988|3|1|LYN to modify upon receipt machine specs|Y
01|168988|3|2|NET Price|Y
01|168988|8|1|LYN to modify upon receipt machine specs|Y
01|168988|8|2|NET PRICE|Y
01|168990|2|1|Quoted as an in stock alternative.|Y
01|169034|2|1|HSK63A-SK20-90P|Y
01|169055|1|1|Air Freight from NIKKEN to L-N|Y
01|169055|1|2|CST101-135-RJ4|Y
01|169055|2|1|TRUCK Freight Cost L-N to AWC (2-3days)|Y
01|169055|2|2|Including Pre-shipment inspection(2-3days)|Y
01|169056|1|1|I only have the Mold Type (extra rigid) in stock.|Y
01|169056|1|2|This does not have coolant ports.|Y
01|169056|10|1|End user wanted 4-pcs I only have 3 in stock. This|Y
01|169056|10|2|item has been discontinued.We have 3-pcs H63A-SF4-80MT|Y
01|169056|10|3|in stock (Mold Type) more rigid. Balance of 1-pc|Y
01|169056|10|4|would be 12~13 weeks.Both holders do not have coolant|Y
01|169056|10|5|ports.|Y
01|169065|5|1|ALT OPT. For Feb. B/O Item|Y
01|169066|1|1|1st Batch/Serinex STD 12/6/21: DWG saved in Teams File|Y
01|169067|18|1|CN503H046|Y
01|169067|19|1|CN450BB015|Y
01|169067|20|1|CN450BB019|Y
01|169067|21|1|CN450BB020|Y
01|169080|3|1|Replacement Cables inside rotary table (wire harness)|Y
01|169080|7|1|Inspection on servo motor|Y
01|169080|7|2|Send out to outsourced facility for close loop feedback|Y
01|169080|7|3|Motor tested fine 30minutes of running|Y
01|169080|7|4|** COST IS $450 **|N
01|169083|7|1|Installation and Training $1500.00 - No Charge|Y
01|169084|2|1|both are currently stocked at factory|Y
01|169095|1|1|Qty Break Pricing 1-4pcs|Y
01|169095|2|1|Qty Break Pricing 5-9pcs|Y
01|169095|3|1|**Qty break pricing 10+pc|Y
01|169101|1|2|Balance ETA Mid January|Y
01|169115|1|1|On CBO for lead|Y
01|169115|2|1|In stock alternative length|Y
01|169141|3|1|Installation inlcudes: Dual axis drive unit short bar|Y
01|169141|3|2|fiber optic cables communications cables bulkhead|Y
01|169141|3|3|cables external cables axis expansion card parameter|Y
01|169141|3|4|changes service time and travel.|Y
01|169144|1|1|Please Note: Beginning Jan 1st 2022 we will have a|Y
01|169144|1|2|price increase. New list price is $580.00 less 32%.|Y
01|169144|2|1|*Special - 3pc only in stock.|Y
01|169144|2|2|*One time special pricing|Y
01|169146|10|1|***Discontiued we are only stocking the non-coolant|Y
01|169146|10|2|holder as offered below***|Y
01|169146|13|1|We have x1 in our Used stock whs loc. increased|Y
01|169146|13|2|discount from 28% to 35%. We will inspect prior to|Y
01|169146|13|3|shipping to assure there are no flaws or isses that|Y
01|169146|13|4|may affect the integrity of the collet|Y
01|169149|6|1|Smooth nut requires the above torque wrench handle and|Y
01|169149|6|2|attachment for NB4007-00230-4.00G|Y
01|169149|10|1|Dual contact is not available|Y
01|169149|11|1|NET ea modification charge|Y
01|169149|12|1|Dual contact is not available|Y
01|169149|13|1|NET ea modification charge|Y
01|169149|15|1|NET ea modification charge|Y
01|169149|17|1|NET ea modification charge|Y
01|169149|18|1|We can't add jet slots to this 5/8 size|Y
01|169149|19|1|We can't add jet slots to this 5/8 size|Y
01|169149|19|2|We do not have dual contact in this longer GL|Y
01|169149|20|1|Cannot add jet slots|Y
01|169149|21|1|We can't add jet slots to this 3/4 size|Y
01|169149|21|2|We do not have Dual contct in this longer size|Y
01|169149|23|1|Only available GL|Y
01|169157|1|1|RGA# TAR-57640 5AX-130  SN:3774|Y
01|169157|3|1|DIRECT MT CABLES|Y
01|169175|1|1|Collet range .8mm - 6mm and 1/8 & 3/16th|Y
01|169175|4|1|Collet range 2mm - 10mm and 1/8-3/8 x 16ths|Y
01|169175|7|1|Collet range 3mm - 16mm and 1/8-5/8 x 16ths|Y
01|169175|10|1|Collet range 4mm - 20mm and 1/8-3/4 x 16ths|Y
01|169175|13|1|Collet range 16.5mm - 25.4mm and 3/16 x 3/4 x 16th|Y
01|169184|1|1|TAR-57566 5AX-250 SN:1612|Y
01|169193|2|1|Please Note: MNL12-CH20Z is non standard stock. Once|Y
01|169193|2|2|a purchase order is placed it cannot be cancelled or|Y
01|169193|2|3|returned.|Y
01|169205|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|169212|1|1|This does not have the safety recess.May interfere with|Y
01|169212|1|2|an ATC arm|Y
01|169212|2|1|ANSI Standard|Y
01|169213|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|169215|2|1|107 PIECES IN STOCK @ US OFFICE|Y
01|169215|2|2|92 PIECES IN STOCK @ FACTORY IN JAPAN|Y
01|169215|3|1|17 PIECES IN STOCK @ US OFFICE|Y
01|169215|3|2|19 PIECES IN STOCK @ FACTORY IN JAPAN|Y
01|169215|4|1|FACTORY STOCK SPECIAL - NO RETURNS OR CANCELLATIONS|Y
01|169215|4|2|PART NUMBER = HSK63A-MMC8C-135-AT|Y
01|169215|4|3|81 PIECES IN STOCK @ FACTORY IN JAPAN|Y
01|169215|5|1|FACTORY STOCK SPECIAL - NO RETURNS OR CANCELLATIONS|Y
01|169215|5|2|PART NUMBER = HSK63A-MMC8C-145-AA|Y
01|169215|5|3|5 PIECES IN STOCK @ FACTORY IN JAPAN|Y
01|169215|6|1|FACTORY STOCK SPECIAL - NO RETURNS OR CANCELLATIONS|Y
01|169215|6|2|PART NUMBER = HSK63A-MMC8C-175-AA|Y
01|169215|6|3|15 PIECES IN STOCK @ FACTORY IN JAPAN|Y
01|169215|8|1|15 PIECES IN STOCK @ US OFFICE|Y
01|169215|9|1|21 PIECES IN STOCK @ FACTORY IN JAPAN|Y
01|169215|10|1|FACTORY STOCK SPECIAL - NO RETURNS OR CANCELLATIONS|Y
01|169215|10|2|PART NUMBER = HSK63A-MMC12C-135-AT|Y
01|169215|10|3|147 PIECES IN STOCK @ FACTORY IN JAPAN|Y
01|169215|11|1|FACTORY STOCK SPECIAL - NO RETURNS OR CANCELLATIONS|Y
01|169215|11|2|PART NUMBER = HSK63A-MMC12C-147-AA|Y
01|169215|11|3|14 PIECES IN STOCK @ FACTORY IN JAPAN|Y
01|169215|12|1|FACTORY STOCK SPECIAL - NO RETURNS OR CANCELLATIONS|Y
01|169215|12|2|6 PIECES IN STOCK @ FACTORY IN JAPAN|Y
01|169215|14|1|FACTORY STOCK SPECIAL - NO RETURNS OR CANCELLATIONS|Y
01|169215|14|2|14 PIECES AVAILABLE @ FACTORY IN JAPAN|Y
01|169217|3|1|Se Necesita Data Sheet|Y
01|169217|3|2|Interface components FANUC|Y
01|169217|4|1|Usa Mismo Soporte que CNC180FA-M|Y
01|169235|2|1|P/N: SK25-25.4A|Y
01|169257|5|1|Stallion trunnion table with a 9x23 Double sided|Y
01|169257|5|2|working surface. Trunnion will be drilled for 6 port|Y
01|169257|5|3|Rotary Joint to feed both sides of trunnion for fixures|Y
01|169257|6|1|1.25 thick baseplate for assembly. Mounting holes and|Y
01|169257|6|2|keyways for a Nikken CNC202 and TAT-170 with Stallion|Y
01|169257|6|3|9/23 two sided trunnion table. Baseplate will be made|Y
01|169257|6|4|to fit onto customer specified Machine Tool.|Y
01|169300|1|1|part# H63A(80)-SF12-70CP-IDI|Y
01|169300|1|2|H63A(80) 12mm Shrink Fit w/ 70mm gage length|Y
01|169300|1|3|Coolant Ports|Y
01|169300|1|4|*Orizon spec: Pan Head Screws for ID Chip Hole.|Y
01|169300|1|5|Chip (BIS-C-122-04/L) and coolant tube installed at|Y
01|169300|1|6|factory|Y
01|169305|3|1|Quoted as an in stock option|Y
01|169312|4|1|.250-.312 Range|Y
01|169319|1|1|Please Note: This milling chuck is non standard stock.|Y
01|169319|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|169319|1|3|or returned. Thank you!|Y
01|169320|1|1|1st Batch|Y
01|169324|3|1|*** Need to use with Matching CKFN Cap + Wrench***|Y
01|169329|7|1|INCLUDES INSTALLATION AND TRAINING-TOTAL OF 8 HRS|Y
01|169331|1|1|Tooling Certificate Number: 3090-3108-111221|Y
01|169358|1|1|Need INS - Need to add screws.|Y
01|169358|2|1|1st Batch(w/ScrewOnKey)?|Y
01|169358|2|2|12/8/21RY:Awaiting DWG from Birla|Y
01|169358|3|1|1st Batch(w/ScrewOnKey)|Y
01|169358|4|1|1st batch|Y
01|169358|5|1|1st batch|Y
01|169358|6|1|1st batch|Y
01|169358|7|1|1st batch|Y
01|169358|8|1|INS:Need to check dual contact tolerance.|Y
01|169358|9|1|INS:Need to check dual contact tolerance.|N
01|169358|10|1|INS:Need to check dual contact tolerance.|N
01|169360|1|1|BIRLA BOAT#212270285 Undershipment|Y
01|169360|1|2|12/08/21:FOC RPLC on next BOAT(I#TBD)|Y
01|169362|7|1|INCLUDES 2 EIGHT HOUR DAYS OF INSTALLATION/TRAING|Y
01|169370|1|1|INCLUDES ADDITIONAL 25% DISCOUNT FOR (1) TOOL|Y
01|169370|1|2|CORE BUY BACK PROGRAM|Y
01|169372|9|1|**Solid Nut version in stock|Y
01|169373|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|169375|1|1|196405|Y
01|169375|1|2|BMT75-ER40Z-ICE-90|Y
01|169375|1|3|BMT75 LIVE - 90DEG TOOL - ER40 ; L1=90mm;|Y
01|169375|1|4|L1=90mm;1/1 GEAR MAX 6000 RPM; MAX 100Nm ;|Y
01|169375|1|5|REF DRWG # 00057016|Y
01|169375|5|1|200095|Y
01|169375|5|2|BMT75-ER40Z-ICE-90-GR2|Y
01|169375|5|3|BMT75 LIVE - 90DEG TOOL - ER40 ;L1=90mm;|Y
01|169375|5|4|2:1 GEAR; MAX 130Nm ;MAX INPUT 4500 RPM|Y
01|169375|5|5|MAX OUTUPT 2250 RPM;REF DRWG # 00059956|Y
01|169379|1|1|TAR-57533 5AX-201 S/N:4217|Y
01|169392|1|1|Due date 12/15.|Y
01|169403|1|1|T32367  Z-Axis|Y
01|169403|1|2|PENDING|Y
01|169403|5|1|T32370 Z-Axis|Y
01|169403|5|2|PENDING|Y
01|169410|1|1|1pc possible end of Dec'21. 1pc showing ETA 3/22|Y
01|169420|4|1|To balance 18 shrink fit holder lines 1-3 of quote to|Y
01|169420|4|2|30K RPM  - ETA 1-1/2 Weeks|Y
01|169420|7|1|Quoted as an in stock option for line 4|Y
01|169420|11|1|This item is not stocked here and is considered|Y
01|169420|11|2|special. Once ordered cannot be cancelled or returned.|Y
01|169420|12|1|This item is not stocked here and is considered|Y
01|169420|12|2|special. Once ordered cannot be cancelled or returned.|Y
01|169444|1|1|EXTRA 6% DISCOUNT Special|Y
01|169456|7|1|HSK100-MTA3-140|Y
01|169462|1|1|P/N: T32527|Y
01|169462|1|2|Machine Info: NLX6000|Y
01|169472|3|1|Please Note: We have CAT50-ER32-6.00 in stock. This|Y
01|169472|3|2|holder comes with a hex nut. List price $205.00|Y
01|169472|3|3|less 42%.|Y
01|169472|4|1|Please Note: We have CAT50-ER40-4.00 in stock. This|Y
01|169472|4|2|holder comes with a hex nut. List price $185.00|Y
01|169472|4|3|less 42%.|Y
01|169476|14|1|INSTALL CHIP / RE-BALANCE|Y
01|169483|1|1|RGA: TAR-57626|Y
01|169483|1|2|CNC260 SN: 7493|Y
01|169483|1|3|Table needs a full rebuild + cables (damaged)|Y
01|169483|24|1|Replacement Direct Mount Cable Set|Y
01|169483|24|2|** Plastic Conduit instead of Metal Braided **|Y
01|169484|2|1|Please Note: We have CAT50-ER32-6.00 in stock. This|Y
01|169484|2|2|holder comes with a hex nut. List price $205.00|Y
01|169484|2|3|less 35%.|Y
01|169484|3|1|Please Note: We have CAT50-ER40-4.00 in stock. This|Y
01|169484|3|2|holder comes with a hex nut. List price $185.00|Y
01|169484|3|3|less 35%.|Y
01|169488|7|1|INCLUDES INSTALLATION AND TRAINING-TOTAL OF 8 HRS|Y
01|169504|9|1|Please Note: MNL12-CH20Z is non standard stock. Once|Y
01|169504|9|2|a purchase order is placed it cannot be cancelled or|Y
01|169504|9|3|returned.|Y
01|169507|3|1|This may be closer fit to cust shank and square|Y
01|169507|4|1|Closest sub to discontinued W1005-0562-6.31|Y
01|169507|4|2|Please refer to drawing sent for dimensions|Y
01|169519|2|1|Include Drive and Hand Labor on Site|Y
01|169519|2|2|Include necesary for 4th axis Installation|Y
01|169527|1|1|KM42-10.5 collet|Y
01|169539|1|1|1st Batch 11/29/21:DWG Saved in Teams/File|Y
01|169539|2|1|1st Batch 11/29/21:DWG saved in Teams/File|Y
01|169539|3|1|1st Batch/Stock 12/15/21:DWG Saved in Teams/File.|Y
01|169556|1|1|$410.00 list|Y
01|169556|2|1|$410.00 list|Y
01|169556|3|1|$410.00 list|Y
01|169556|4|1|$410.00 list|Y
01|169556|5|1|$421.00 list|Y
01|169556|6|1|$421.00 list|Y
01|169556|7|1|$421.00 list|Y
01|169556|8|1|$421.00 list|Y
01|169556|9|1|$421.00 list|Y
01|169569|1|1|8 stock 17 ETA 3wks bal 11-12wks|Y
01|169569|1|2|NOTE: MFG Winter shutdown 12/22 ~ 1/7|Y
01|169569|6|1|24 stock balance ETA 1/15|Y
01|169575|1|1|NET price for special|Y
01|169575|2|1|NET price for special|Y
01|169578|6|1|Yas Saeki will help set it up and provide training.|Y
01|169583|4|1|2 holes DIN modification|Y
01|169590|1|1|1st Batch|Y
01|169590|2|1|1st Batch|Y
01|169590|3|1|Req.INS/Install E40-NUT & ER40-SCREW(C)|Y
01|169590|4|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|169590|5|1|1st Batch|Y
01|169590|6|1|1st Batch|Y
01|169590|7|1|1st Batch|Y
01|169590|8|1|1st Batch|Y
01|169590|9|1|1st Batch|Y
01|169590|10|1|1st Batch|Y
01|169596|1|1|Req.INS/Install E16-NUT B/U Screw should be included.|Y
01|169596|2|1|1st Batch/For stock 6/14/21:DWG Approved/BT|Y
01|169596|3|1|1st Batch/Stock|Y
01|169596|4|1|1st Batch/(8)877201 4/5/21:DWG Aprv'd/TR>revised7/21/21|Y
01|169596|5|1|1st Batch/For stock 7/23/21:DWG Approved/BT|Y
01|169596|6|1|1st Batch/(9)CBP 8/9/21:DWG Pre-approved/BT|Y
01|169596|7|1|1st Batch/886300 JWP Mfg. 8/20/21:DWG Pre-Approved/BT|Y
01|169596|8|1|1st Batch/For stock 7/23/21:DWG Approved/BT|Y
01|169596|9|1|1st Batch/(2)891150/Yamazen/Urschel 8/26/21:DWGapproved|Y
01|169599|1|1|This is a direct mount A2-6 spindle nose 8 inch 3 jaw|Y
01|169599|1|2|IN STOCK|Y
01|169602|1|1|1 IN Stock - Returned From Trade Show Demo|Y
01|169604|2|1|Will include Hi Torque Bearing Nut|Y
01|169604|7|1|***Please confirm*** Excel file references on line#8|Y
01|169604|7|2|(C) for another coolant collet however line description|Y
01|169604|7|3|is asking for a standard collet. we have both in stock.|Y
01|169604|10|1|C5005-0562-5.02 Discontinued|Y
01|169604|12|1|C5005-0875-5.66 Discontinued|Y
01|169604|14|1|***Option** x2 on our shelves?|Y
01|169604|15|1|***Option 2***|Y
01|169604|16|1|NT15-SET-10 Discontinued|Y
01|169604|22|1|***TQW-150*** In process of being discontinued|Y
01|169605|1|1|Reference RGA# LVR-57761|Y
01|169605|1|2|Repair of OKE4-ER40Z-ICE s/n: 99251 01|Y
01|169605|1|3|(Mimatic# 190233)|Y
01|169605|2|1|Bearings seals o-rings and 1 output spindle to be|Y
01|169605|2|2|replaced. Recondition 1 input spindle.|Y
01|169607|1|1|1-2pc qty break|Y
01|169607|2|1|3-4pc qty break|Y
01|169607|3|1|5-9pc qty break|Y
01|169607|4|1|10+pc|Y
01|169645|1|1|P/N: T32527|Y
01|169645|1|2|Machine Info: NLX6000|Y
01|169648|1|1|Req. INS/Install E25-NUT & ER25-SCREW(C)|Y
01|169648|2|1|Req. INS/Re-etching/Relabel/Install SKN-10K|Y
01|169648|3|1|Req. INS/Re-etching/Relabel/Install SKN-16B|Y
01|169648|4|1|1st Batch/Install E11-NUT & ER11-SCEW(C)|Y
01|169652|1|1|P/N: T32527|Y
01|169652|1|2|Machine Info: NLX6000|Y
01|169658|197|1|WRENCH FOR CAT40-ER20-4.00 HOLDERS|Y
01|169658|198|1|WRENCH FOR NC5027-0020-6.00 WRENCHES|Y
01|169658|199|1|WRENCH FOR CAT50-ER25-4.00 & 6.00 HOLDERS|Y
01|169658|200|1|WRENCH FOR CAT50-ER32-4.00 & 6.00 HOLDERS|Y
01|169658|201|1|WRENCH FOR CAT50-ER40-4.00 & 6.00 HOLDERS|Y
01|169658|202|1|WRENCH FOR CAT50-C1-105U-IDU|Y
01|169658|203|1|WRENCH FOR CAT50-C3/4-105U-IDU|Y
01|169658|204|1|WRENCH FOR CAT50-SK6-165U-IDU HOLDER|Y
01|169667|1|1|Reference RGA# LVR-57730|Y
01|169667|1|2|Repair of MNZ20-SK16X-ICE-12K s/n: 19902304 21|Y
01|169667|1|3|(Mimatic# 193568)|Y
01|169667|2|1|Bearings seals o-rings and 1 spindle to be replaced.|Y
01|169667|4|1|Repair of MNZ20-SK16X-ICE-12K s/n: 19902304 08|Y
01|169667|4|2|(Mimatic# 193568)|Y
01|169667|5|1|Bearings seals o-rings and 1 spindle.|Y
01|169667|7|1|Repair of MNZ20-SK16X-ICE-12K s/n: 19902304 27|Y
01|169667|7|2|(Mimatic# 193568)|Y
01|169667|8|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|169667|8|2|1 spindle.|Y
01|169667|10|1|Repair of MNZ20-SK16X-ICE-12K s/n: 19902304 10|Y
01|169667|10|2|(Mimatic# 193568)|Y
01|169667|11|1|Bearings seals o-rings and spindle threadring to be|Y
01|169667|11|2|replaced. Recondition 1 spindle.|Y
01|169667|13|1|Repair of MNZ20-SK16X-ICE-12K s/n: 19902304 11|Y
01|169667|13|2|(Mimatic# 193568)|Y
01|169667|14|1|Bearings seals o-rings and spindle threadring to be|Y
01|169667|14|2|replaced. Recondition 1 spindle.|Y
01|169667|16|1|Repair of MNZ20-SK16Z-ICE-12K s/n: 19903686 04|Y
01|169667|16|2|(Mimatic# 193643)|Y
01|169667|17|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|169667|17|2|1 output spindle.|Y
01|169667|19|1|Repair of MNZ20-SK16Z-12K s/n: 19904122 08|Y
01|169667|19|2|(Mimatic# 196235)|Y
01|169667|20|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|169667|20|2|1 output spindle.|Y
01|169677|1|1|We have 5 in stock and should be able to ship out 3|Y
01|169677|1|2|more in December with a 6 to 8 week lead time for the|Y
01|169677|1|3|remaining 4.|Y
01|169688|1|1|part# CAT50-C2F-125U-IDU-M|Y
01|169688|1|2|CAT50 2 Milling Chuck IdChipHole - Modified|Y
01|169688|1|3|DIN Form B|Y
01|169688|1|4|Mori Machine|Y
01|169688|7|1|CKFN50(2)-2DC|Y
01|169688|7|2|Sealed Style|Y
01|169688|7|3|CCK Coolant Seal Nut/Cap OD50(2) ID 2 Direct Mount|Y
01|169688|7|4|*NET PRICE|Y
01|169692|3|1|Includes: Drive unit short bar fiber optic cable|Y
01|169692|3|2|communications cable bulkhead cables external cables|Y
01|169692|3|3|cable managment parameter changes service time and|Y
01|169692|3|4|travel.|Y
01|169693|1|1|12 in stock ETA on 10 end Jan. ETA bal pending|Y
01|169696|1|1|Quoted as NET pricingnon-returnablenon-cancelable|Y
01|169696|2|1|customer providing balluf chip to be installed on|Y
01|169696|2|2|holder and balanced|Y
01|169696|3|1|Coolant back-up screw and coolant tube installed|Y
01|169710|1|1|8 stock 17 ETA 3wks bal 11-12wks|Y
01|169710|1|2|NOTE: MFG Winter shutdown 12/22 ~ 1/7|Y
01|169710|8|1|24 stock balance ETA 1/15|Y
01|169728|1|1|New List Price $634.00 beginning Jan 1st.|Y
01|169728|2|1|New List Price $42.00 beginning Jan 1st.|Y
01|169741|5|1|P/N: BMT65-CAPTO4X-ICE|Y
01|169741|5|2|197602|Y
01|169743|4|1|The on size version is not avail in this size|Y
01|169762|1|1|New Price effective 01/01/2022 >>$1679.00 list|Y
01|169762|2|1|New Price effective 01/01/2022 >>$3125.00 list|Y
01|169762|3|1|New Price effective 01/01/2022 >>$106.00 list|Y
01|169762|4|1|New Price effective 01/01/2022 >>$21.00 list|Y
01|169762|6|1|New Price effective 01/01/2022 >>$3833.00 list|Y
01|169762|7|1|New Price effective 01/01/2022 >>$3885.00 list|Y
01|169762|8|1|New Price effective 01/01/2022 >>$2205.00 list|Y
01|169762|9|1|New Price effective 01/01/2022 >>$150.00 list|Y
01|169762|10|1|New Price effective 01/01/2022 >>$41.00 list|Y
01|169764|1|1|Includes: Dual axis drive unitshort bar fiber optic|Y
01|169764|1|2|cables communications cable bulkhead cables|Y
01|169764|1|3|parameter changes service time and travel.|Y
01|169767|1|1|Balance of 3 pcs ETA Late February|Y
01|169773|1|1|New Price effective 01/01/2022 >>$492.00 list.|Y
01|169773|2|1|New Price effective 01/01/2022 >>$90.00 list.|Y
01|169773|3|1|New Price effective 01/01/2022 >>$28.00 list.|Y
01|169778|10|1|BT40-SK10F-120P-M|Y
01|169778|10|2|Hi-Speed|Y
01|169782|1|1|Delivery: 3-pcs 1~3 days/Balance 1st week of Jan.|Y
01|169782|1|2|Please Note: Effective Jan 1st the new price is $576.00|Y
01|169782|1|3|This quote is valid for 30 days. Thank you!|Y
01|169790|1|1|Comes with 40mm SK16 Nut|Y
01|169790|1|2|SK16 Collet Ranges up to 5/8 or 16mm capacity|Y
01|169790|2|1|Comes with same sk16 collet nut and collet system|Y
01|169791|1|1|NCAT50-SF0312-5.12CP|Y
01|169791|1|2|NCAT50 Dual Contact Shrink Fit Holder 5/16 W/Coolant|Y
01|169791|1|3|Ports.|Y
01|169793|1|1|For ER11 chucks|Y
01|169793|2|1|For ER16 chucks|Y
01|169793|3|1|For ER32 chucks|Y
01|169793|4|1|For TG100 chucks|Y
01|169793|5|1|For NPU13 Drill chuck|Y
01|169805|36|1|16002ZZ X 2|Y
01|169805|36|2|6807ZZ X 2|Y
01|169805|36|3|VO65805X 1|Y
01|169810|1|1|Part# CAT50U-AF1-30-OH-Main body CAT50 back spot face|Y
01|169810|1|2|Material is steel d -.75 D - 1  t - .125|Y
01|169810|1|3|T-1.5 H- open behind.|Y
01|169810|2|1|BF130-19.05-25.4-38.1C - Arbor for above|Y
01|169810|3|1|9BF130-19.05-25.4-38.1C-H - HSS Byte for above|Y
01|169810|3|2|MOQ - 3 pcs|Y
01|169826|197|1|WRENCH FOR SK6 HOLDERS|Y
01|169826|198|1|WRENCH FOR NC5027-0020-6.00 HOLDERS|Y
01|169826|199|1|WRENCH FOR CAT40-ER20-4.00|Y
01|169826|200|1|WRENCH FOR ER32 HOLDERS|Y
01|169826|201|1|WRENCH FOR ER40 HOLDERS|Y
01|169826|202|1|WRENCH FOR SK13 HOLDERS|Y
01|169826|203|1|WRENCH FOR 3/4 MILLING CHUCK|Y
01|169826|204|1|WRENCH FOR 1 MILLING CHUCK|Y
01|169832|1|1|P/N: HSK63A-RAC43-150E-C|Y
01|169832|1|2|Roughing Head|Y
01|169832|2|1|P/N: HSK63A-ZMAC42-150V|Y
01|169832|2|2|Finishing Head|Y
01|169846|1|1|1st Batch|Y
01|169846|2|1|1st Batch|Y
01|169852|3|1|1st Batch|Y
01|169855|1|1|***Set 1***|Y
01|169855|4|1|***In Stock Option***|Y
01|169855|6|1|***Please review and confirm Pull stud Drwaing***|Y
01|169855|9|1|***Set 2***|Y
01|169857|52|1|Brand new control with pendant cable|Y
01|169862|1|1|1st Batch/(8)CBO 4/16/20:DWG approved.|Y
01|169862|2|1|1st Batch/For stock 2/1/21:DWG Approved|Y
01|169862|3|1|1st Batch/For stock 2/1/21:DWG Approved|Y
01|169862|4|1|1st Batch/For stock 2/1/21:DWG Approved|Y
01|169862|5|1|1st Batch/For stock 2/1/21:DWG Approved|Y
01|169862|6|1|1st Batch|Y
01|169862|7|1|1st Batch|Y
01|169862|8|1|1st Batch/Give to Tim for INS  DWG:Still pending 6/10|Y
01|169872|3|1|105MM GL = 4.13|Y
01|169872|3|2|THESE ARE DISCONTINUED & CHEAPER THAN 4.00 HOLDERS|Y
01|169873|3|1|use this old part# until stock is depleted|Y
01|169878|1|1|Desc: Retention Knob/Pull Stud CAT50 Coolant|Y
01|169878|1|2|Spec: 1.142D .768d1 .461d2 .701L1 1.004L2 45a .197W|Y
01|169878|1|3|1-8UNC|Y
01|169879|1|1|Req. INS/Check RPM/Noise|Y
01|169879|2|1|1st Batch|Y
01|169879|3|1|1st Batch|Y
01|169889|4|1|INSTALLATION INCLUDES:|Y
01|169889|4|2|LABOR & TRAVEL EXPENSES FOR LYNDEX NIKKEN INSTALLER;|Y
01|169889|4|3|WIRING FROM CABINET TO BULKHEAD BULKHEAD CONNECTORS|Y
01|169889|4|4|& PARAMETERS FOR PROPER TABLE OPERATION.|Y
01|169894|1|1|Pricing stays the same for 2022.|Y
01|169894|2|1|New List Price Effective Jan 1st $167.00 list.|Y
01|169894|3|1|New List Price Effective Jan 1st $167.00 list.|Y
01|169894|4|1|New List Price Effective Jan 1st $167.00 list.|Y
01|169894|5|1|New List Price Effective Jan 1st $167.00 list.|Y
01|169894|6|1|New List Price Effective Jan 1st $167.00 list.|Y
01|169894|7|1|New List Price Effective Jan 1st $167.00 list.|Y
01|169894|8|1|New List Price Effective Jan 1st $186.00 list.|Y
01|169899|3|1|P/N: HSK100A-SK6-105P|Y
01|169899|3|2|HSK100A SK6 Slim Chuck Coolant|Y
01|169902|1|1|Reference RGA#TOR-57744/|Y
01|169902|1|2|Repair of 1 x CAT50-UMT200UW|Y
01|169902|4|1|Calibration service included.|Y
01|169904|5|1|9BKU-CNCZ632ZAR|Y
01|169904|7|1|CN503TRJ210060376AL|Y
01|169904|10|1|9BKU-CNCZ632ZAR|Y
01|169904|14|1|9BKU-CNC501RA|Y
01|169904|21|1|NIK-1555-650|Y
01|169905|1|1|w/ standard 82mm pitch position pin|Y
01|169915|5|1|replaces SKN-10BJ|Y
01|169915|8|1|replaces SKN-10BJ|Y
01|169915|11|1|replaces SKN-6WBJ|Y
01|169923|5|1|CONFIRM SHANK & SQUARE|Y
01|169927|4|1|CAT40-SK13-60U-IDU|Y
01|169927|4|2|CAT40 SK13 Slim Chuck IdChipHole 15000rpm|Y
01|169927|4|3|Minimum order 10-pcs|Y
01|169933|2|1|BT40-SK20-60-J|Y
01|169933|2|2|BT40 SK20 Slim Chuck with J-Nut (SKN-20BJ)|Y
01|169933|6|1|SK20-5A (SK20 Slim Chuck Collet 5mm On Size)|Y
01|169933|7|1|SK20-6A (SK20 Slim Chuck Collet 6mm On Size)|Y
01|169933|11|1|SKJ25-5|Y
01|169933|11|2|SK20/SK25 Coolant Cap 5.0mm Jet Slots|Y
01|169933|12|1|SKJ25-5C|Y
01|169933|12|2|SK20/SK25 Coolant Thru Cap 5.0mm|Y
01|169933|13|1|SKJ25-6|Y
01|169933|13|2|SK20/SK25 Coolant Cap 6.0mm Jet Slots|Y
01|169933|14|1|SKJ25-6C|Y
01|169933|14|2|SK20/SK25 Coolant Thru Cap 6.0mm|Y
01|169933|17|1|SK20-6A (SK20 Slim Chuck Collet 6mm On Size)|Y
01|169934|1|1|Extended discount reflects non returnable test tool|Y
01|169934|2|1|non returnable|Y
01|169934|3|1|non returnable|Y
01|169934|4|1|non returnable|Y
01|169938|1|1|NT40SP-13B-110|Y
01|169938|1|2|Special hob arbor|Y
01|169942|1|1|ONE TIME SPECIAL PRICE FOR BACK UP USE|Y
01|169945|2|1|12 or more pcs 15%|Y
01|169945|4|1|12 or more pcs 15%|Y
01|169948|1|1|Quoted at NET pricing|Y
01|169956|5|1|9BKU-CNCZ632ZAR|Y
01|169956|7|1|CN503TRJ210060376AL|Y
01|169956|14|1|9BKU-CNC501RA|Y
01|169956|21|1|NIK-1555-650|Y
01|169958|2|1|Will include Hi Torque Bearing Nut|Y
01|169958|7|1|***Please confirm*** Excel file references on line#8|Y
01|169958|7|2|(C) for another coolant collet however line description|Y
01|169958|7|3|is asking for a standard collet. we have both in stock.|Y
01|169958|10|1|C5005-0562-5.02 Discontinued|Y
01|169958|12|1|C5005-0875-5.66 Discontinued|Y
01|169958|14|1|***Option** x2 on our shelves?|Y
01|169958|15|1|***Option 2***|Y
01|169958|16|1|NT15-SET-10 Discontinued|Y
01|169958|22|1|***TQW-150*** In process of being discontinued|Y
01|169960|1|1|This has a 4 to 5 week lead time|Y
01|169960|2|1|This has an 8 week lead time|Y
01|169964|1|1|Replaces BT30-BHC3/4-38 which was discontinued|Y
01|169992|2|1|Hradware and Hand Labor for Fanuc Interface|Y
01|169995|1|1|Morse taper requested|Y
01|170006|1|1|MOQ 100+|Y
01|170006|1|2|Special Order. Unit Price Each.|Y
01|170006|2|1|MOQ 500+|Y
01|170006|2|2|Special Order. Unit Price Each.|Y
01|170006|3|1|MOQ 1000+|Y
01|170006|3|2|Special Order. Unit Price Each.|Y
01|170011|4|1|SK6 range is to 6mm.|Y
01|170011|4|2|Added SK10 collet for the 8mm size|Y
01|170024|1|1|P/N: BMT65-CAPTO4X-ICE|Y
01|170024|1|2|Mimatic# 197605 Straight Unit BMT65 Capto C4|Y
01|170024|1|3|with Internal Coolant (ICE) 1:1 L=65 S1=112|Y
01|170024|1|4|Lyndex Part number may change|Y
01|170028|1|1|CAT50-MMC4C-105U-IDU|Y
01|170028|1|2|CAT50 4mm Mini-Mini Chuck Bevel Gear Type Coolant|Y
01|170028|1|3|Pricing good until 1/27/2022|Y
01|170028|1|4|Special order non-cancelable & non-returnable after|Y
01|170028|1|5|receipt of PO|Y
01|170028|1|6|NET PRICE QUOTED NO FURTHER DISCOUNTS TO BE TAKEN|Y
01|170032|5|1|Pricing valid until 12/30/21 for back orders|Y
01|170047|11|1|SPECIAL ORDER NON-CANCELABLE NON-RETURNABLE ARO|Y
01|170047|12|1|SPECIAL ORDER NON-CANCELABLE NON-RETURNABLE ARO|Y
01|170047|14|1|SPECIAL ORDER NON-CANCELABLE NON-RETURNABLE ARO|Y
01|170049|1|1|1st Batch *DWG Saved in Teams/File|Y
01|170049|1|2|1/21RY:I#453 Labled/Etched NTPT05-008(S). Need INS.|Y
01|170049|2|1|1st Batch 11/29/21:DWG saved in Teams/File|Y
01|170049|3|1|1st Batch/902706 12/20/21:DWG saved in Teams File|Y
01|170054|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXES|Y
01|170056|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|170058|2|1|Alternative w/Hi-Torque Bearing Nut|Y
01|170058|3|1|Alternative with solid nut|Y
01|170060|1|1|.3149 Shank cutter for Carbide C/T Drill H2|Y
01|170060|4|1|.3149 Shank cutter for 5/16 5 Flute Carbide Endmill H3|Y
01|170060|7|1|.3149 Shank cutter for  5 Flute Carbide Endmill H4|Y
01|170060|10|1|.433 Shank for Carbide Reamer H6|Y
01|170060|13|1|.312 Shank for Carbide Reamer H6|Y
01|170060|16|1|3/8 Diameter Cutting Tool|Y
01|170060|19|1|.310 Diameter Cutting Tool|Y
01|170060|22|1|.313 Diameter Cutting Tool|Y
01|170060|25|1|1/4 Diameter Cutting Tool|Y
01|170060|28|1|1/4 Diameter Cutting Tool|Y
01|170060|31|1|1/4 Diameter Cutting Tool|Y
01|170062|1|1|MSC responsible for Expedited Freight Charge from fctry|Y
01|170062|1|2|to Lyndex Nikken warehouse for PO#9937372001|Y
01|170062|1|3|Standard freight charge from Mundelein to Unipres to be|Y
01|170062|1|4|billed additionall against UPS acct. E71A07|Y
01|170067|15|1|MCT45-42|Y
01|170067|16|1|FT45-6|Y
01|170082|2|1|***In Stock Option***|Y
01|170083|3|1|BT40-FMA25.4-45|Y
01|170083|3|2|BT40 Shell/Face Mill Holder 1|Y
01|170083|6|1|NBT40-FMC22-45|Y
01|170083|6|2|NBT40 Dual Contact Shell/Face Mill Holder 22mm|Y
01|170084|1|1|Includes Haas Motors and Cables|Y
01|170092|3|1|**Needed for Hydraulic Braking on CNC260 & TAT-250|Y
01|170092|3|2|otherwise standard is Pneumatic Braking.|Y
01|170092|4|1|**1000 Max PSI|Y
01|170094|1|1|Drawing Part #SF5.9-C16-121|Y
01|170094|1|2|Quoted at NET price|Y
01|170101|1|1|Reference RGA#TOR-57783/|Y
01|170101|1|2|Repair of SF-START2-UNIT-200 s/n: 2J272|Y
01|170119|1|1|HSK63A-MDPE25-105|Y
01|170119|1|2|HSK63A 25mm Major Dream Pro-Endmill Holder|Y
01|170119|1|3|Arbor + Head Set.(Including Tip clamp bolts and Wrench)|Y
01|170119|2|1|AOMT184804PEER-M|Y
01|170119|2|2|Insert (AOMT) (10pc Set) Nose R0.4|Y
01|170142|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|170145|1|1|Includes Power and Feed back cables from Nikken table|Y
01|170145|1|2|to Machine Bulkhead|Y
01|170145|1|3|Delivery for (3) Sets is 8 Week A.R.O.|Y
01|170145|1|4|Delivery for (5) Sets is 12-16 Weeks A.R.O.|Y
01|170161|1|1|HSK63A-MDPE25-105|Y
01|170161|1|2|HSK63A 25mm Major Dream Pro-Endmill Holder|Y
01|170161|1|3|Arbor + Head Set.(Including Tip clamp bolts and Wrench)|Y
01|170161|2|1|AOMT184804PEER-M|Y
01|170161|2|2|Insert (AOMT) (10pc Set) Nose R0.4|Y
01|170169|1|1|CAT50-MMC-105U-IDU|Y
01|170169|1|2|CAT50 4mm Mini-Mini Chuck Bevel Gear Type Coolant|Y
01|170169|1|3|Pricing good until 1/27/2022|Y
01|170169|1|4|Special Order non-cancelable & non-returable after|Y
01|170169|1|5|receipt of PO|Y
01|170169|1|6|NET PRICE QUOTED NO FURTHER DISCOUNTS TO BE TAKEN|Y
01|170171|1|1|Price reflect purchase order of 1~4 tools.|Y
01|170171|2|1|Price reflects a purchase order or 5+ tools.|Y
01|170172|1|1|Includes Haas motors and cables.|Y
01|170176|1|1|Qty 1-2pcs|Y
01|170176|2|1|Qty 3-5pcs|Y
01|170176|3|1|MZMP46-ER16-AD-ICE|Y
01|170176|3|2|Mazak Live ER16 STRT Adjustable ICE IntExtcoolant|Y
01|170176|3|3|ref. drawing 189784|Y
01|170176|3|4|Machine: Mazak HQX-250MSY|Y
01|170176|3|5|Quoted at NET price|Y
01|170176|3|6|*Qty 6+pcs|Y
01|170183|2|1|Please order part# CAT50-ER32-8.00DIN-M|Y
01|170185|2|1|BT40-C25-70G|Y
01|170185|2|2|BT40 25mm Milling Chuck High Speed|Y
01|170185|2|3|*Alternative for above*|Y
01|170185|4|1|4 in stock at Japan - Delivery 2-3 weeks|Y
01|170185|4|2|Balance 3-3.5 mths|Y
01|170185|6|1|BT40-RAC25-165E|Y
01|170185|6|2|BT40 RAC Balance Cut Boring Head|Y
01|170185|8|1|BT40-RAC43-180-C|Y
01|170185|8|2|BT40 RAC Balance Cut Boring Head|Y
01|170185|9|1|BT40-RAC53-210-C|Y
01|170185|9|2|BT40 RAC Balance Cut Boring Head|Y
01|170185|10|1|BT40-RAC70-180-C|Y
01|170185|10|2|BT40 RAC Balance Cut Boring Head|Y
01|170185|18|1|BT40-ZMAC25-150V|Y
01|170185|18|2|BT40 ZMAC Boring Bar Advanced|Y
01|170185|19|1|BT40-ZMAC32-180V|Y
01|170185|19|2|BT40 ZMAC Boring Bar Advanced|Y
01|170185|20|1|BT40-ZMAC42-150V|Y
01|170185|20|2|BT40 ZMAC Boring Bar Advanced|Y
01|170185|24|1|BT50-FMC22-150|Y
01|170185|24|2|BT50 Shell/Face Mill Holder 22mm|Y
01|170185|32|1|5 Pieces in stock at Japan delivery 1-2 weeks|Y
01|170185|32|2|Balance 4-6 weeks|Y
01|170185|33|1|BT40-RAC32-180E|Y
01|170185|33|2|BT40 RAC Balance Cut Boring Head|Y
01|170185|37|1|BT40-FMB22-200|Y
01|170185|37|2|BT40 Shell/Face Mill Holder 22 mm|Y
01|170186|3|1|We only have 3 available then new part number is|Y
01|170186|3|2|NC5007-0032-4.00G.|Y
01|170186|4|1|New list price on Jan 1st $390.00 list .|Y
01|170187|7|1|This is the collet system for milling that you ordered|Y
01|170187|7|2|for the MU|Y
01|170187|10|1|This collet is not offered in an AC version. If you|Y
01|170187|10|2|need AC I would recommend a 7MM Shank endmill|Y
01|170187|10|3|See page 32 in Big Blue Catalog|Y
01|170187|11|1|I would use this holder for insert indexable and|Y
01|170187|11|2|boring bars|Y
01|170187|12|1|This is a collet that allows the 1/1.4 milling chuck|Y
01|170187|12|2|to hold 3/4 shank|Y
01|170187|13|1|screws onto the fine thread of the above collet to|Y
01|170187|13|2|seal for coolant thru|Y
01|170187|14|1|same as above|Y
01|170195|2|1|Alternate to the HSK63A-ER32-4.00|Y
01|170198|1|1|1st Batch|Y
01|170202|2|1|BT40-SK13-60|Y
01|170202|2|2|BT40 SK13 Slim Chuck|Y
01|170202|5|1|SK13-5A|Y
01|170202|5|2|SK13 Slim Chuck Collet 5.0mm On Size|Y
01|170206|2|1|Final Part Number: C5007-0500-2.50DIN-M|Y
01|170207|1|1|Tooling Certificate Number:|Y
01|170228|1|1|For Mazak BT40 Coolant Thru|Y
01|170228|2|1|For Yasda BT40 Coolant Thru|Y
01|170229|3|1|***In Stock Option***|Y
01|170236|5|1|replaces SKN-10BJ|Y
01|170236|8|1|replaces SKN-10BJ|Y
01|170236|11|1|replaces SKN-6WBJ|Y
01|170239|1|1|TAR-57716 CNC202-2W-250F S/N:15504T|Y
01|170248|1|1|1st Batch|Y
01|170248|2|1|1st Batch/(6)CBO.Install E25-NUT & ER25-SCREW(C)|Y
01|170248|3|1|Req. INS/(4)CBO Install E32-NUT & ER32-SCREW(C)|Y
01|170248|4|1|1st Batch/897185 L-3/Instali E20-MINI-NUT/ER20-SCREW(C)|Y
01|170248|5|1|1st Batch/897185 L-3 10/25/21: DWG Approved/TR|Y
01|170248|6|1|1st Batch/Install E25-NUT-G & ER25-SCREW(C)|Y
01|170251|3|1|Cable Set|Y
01|170260|2|1|Stallion 6 x 6 x 36 Plain Cast Iron Tombstone with|Y
01|170260|2|2|pneumatic clamping outboard support. 1-1/4 Thick Base|Y
01|170260|2|3|Plate made to fit on Hyundai Wia KF4600-II.|Y
01|170267|1|1|B01-20211027001 RCV error|Y
01|170267|2|1|B01-20211027001 RCV error|Y
01|170267|3|1|B01-20211027001 RCV error|Y
01|170267|4|1|B01-20211027001 RCV error|Y
01|170267|5|1|B01-20211027001 RCV error|Y
01|170267|6|1|B01-20211027001 RCV error|Y
01|170267|7|1|B01-20211027001 RCV error|Y
01|170267|8|1|B01-20211027001 RCV error|Y
01|170267|9|1|B01-20211027001 RCV error|Y
01|170268|5|1|M-CODE INSTALLATION TO EXISTING MACHINE|Y
01|170285|1|1|Sumitomo Part # CT50-40SMH|Y
01|170293|1|1|TAR-57718 5AX-1530 SN:1739|Y
01|170326|1|1|*DIN Modified|Y
01|170326|3|1|*DIN Modified|Y
01|170328|1|1|Balluff BIS0048 >> BIS-M-122-01/A  Balluff Chip|Y
01|170328|1|2|Price reflects 1~10 pcs.|Y
01|170328|2|1|Balluff BIS0048 >> BIS-M-122-01/A  Balluff Chip|Y
01|170328|2|2|Price reflects 11+|Y
01|170336|1|1|NCAT40-SK20-50UP-IDU|Y
01|170336|1|2|NCAT40 Dual Contact SK20 Slim Chuck IdChipHole|Y
01|170336|1|3|Hi-Speed 25K RPM|Y
01|170344|1|1|167731_167710_SN16539_SN16536: Coolant Sealing kit|Y
01|170344|1|2|included all coolant sealing bushing seals and o-rings|Y
01|170344|2|1|167731_SN555: Coolant sealing kit included all coolant|Y
01|170344|2|2|sealing bushing seals and o-rings|Y
01|170344|3|1|167731_SN77810: Coolant sealing kit included all|Y
01|170344|3|2|coolant sealing bushing seals and o-rings|Y
01|170346|1|1|New List Price Effective Jan 1st. $3626.00|Y
01|170348|1|1|This item is considered a special not cancelable nore|Y
01|170348|1|2|returnable once order is placed to the factory|Y
01|170349|1|1|New List Price Effective Jan 1st $435.00.|Y
01|170352|1|1|H50E-SF0750-3.15  HSK50E Shrink Fit Holder 3/4X 3.15|Y
01|170352|1|2|gage length 30000 RPM|Y
01|170352|1|3|Delivery 13-14 weeks after drawing approval|Y
01|170352|1|4|This item is considered special and cannot be|Y
01|170352|1|5|be cancelled or returned.|Y
01|170352|2|1|This item is considered speical once ordered it cannot|Y
01|170352|2|2|be cancelled or returned|Y
01|170352|7|1|This is our shortest offered.|Y
01|170363|1|1|1st Batch/for stock 2/24 approved by Andrew|Y
01|170370|1|1|Tooling Certificate Number:13485-3150-122821|Y
01|170371|1|1|1st Batch/For stock 12/16/20:DWG Approved|Y
01|170371|2|1|1st Batch/867168 Yamazen 2/1/21: DWG Approved|Y
01|170371|3|1|1st Batch/For stock 2/1/21:DWG Approved|Y
01|170371|4|1|1st Batch/(2)858067/862678 Morris South 12/18/20:Aprved|Y
01|170371|5|1|1st Batch/For stock 2/1/21:DWG Approved|Y
01|170371|6|1|1st Batch/Give to Tim for INS  DWG:Still pending 6/10|Y
01|170372|1|1|New List Price Effective Jan 1st. $3626.00|Y
01|170384|1|1|HSK100A 5/8 SFH GL 7.50 // H100A-0625-7.50|Y
01|170384|4|1|HSK100A 5/8 SFH GL 7.50 // H100A-0625-7.50|Y
01|170411|1|1|One time special show table pricing|Y
01|170416|1|1|NET PRICE|Y
01|170417|1|1|Installed with PS-868 at the factory|Y
01|170417|1|2|Quoted as NET pricing non-returnablenon-cancelable|Y
01|170426|2|1|Special made per request/design|Y
01|170426|3|1|HAAS machine positioning block|Y
01|170426|5|1|Blank positioning block with P/N: AHA-03000-01 bushing|Y
01|170436|1|1|Net price at 1pc|Y
01|170436|2|1|Net price at 2pc|Y
01|170443|1|1|Quoted at NET price minimum order 24-pcs.|Y
01|170443|2|1|Quoted at NET price minimum order 48-pcs.|Y
01|170445|1|1|Req. INS/903343 *Last Purchase was in 2016|Y
01|170445|2|1|1st Batch|Y
01|170452|1|1|New Price Effective Jan 24th $432.00 less 42%.|Y
01|170452|2|1|New Price Effective Jan 24th $361.00 less 42%.|Y
01|170456|1|1|This table is for OSP-3 and includes cables from|Y
01|170456|1|2|Nikken tbale to machine bulkhead|Y
01|170456|2|1|This table is for OSP-3 and includes cables from nikken|Y
01|170456|2|2|Table to machine bulkhead|Y
01|170458|1|1|This has a 6 to 8 week lead time.|Y
01|170460|2|1|Includes power and feed back cables to machine bulkhead|Y
01|170460|2|2|Icludes 4th and 5th axis interface cables from machine|Y
01|170460|2|3|bulkhead to Amps Amps - does not include installation|Y
01|170476|1|1|Tooling Certificate Number:13687-3120-120221|Y
01|170497|1|1|Reference RGA#LVR-57764/|Y
01|170497|1|2|Repair of 1 x OK112-10000-02 s/n: AL0066|Y
01|170497|2|1|Bearings o-rings collet Nut and spindle to be|Y
01|170497|2|2|replaced.|Y
01|170497|4|1|Repair of 1 x OK112-10000-02 s/n: AL0067|Y
01|170497|5|1|Bearings o-rings collet Nut and spindle to be|Y
01|170497|5|2|replaced.|Y
01|170497|7|1|Repair of 1 x OK112-10000-02 s/n: AL0068|Y
01|170497|8|1|Bearings o-rings collet Nut and spindle to be|Y
01|170497|8|2|replaced.|Y
01|170497|10|1|Repair of 1 x OK112-10000-02 s/n: AL0087|Y
01|170497|11|1|Bearings o-rings collet Nut and spindle to be|Y
01|170497|11|2|replaced.|Y
01|170523|1|1|Last 2 piecesDIN holes are NOT plugable|Y
01|170532|1|1|This is a direct mount A2-6 spindle nose 8 inch 3 jaw|Y
01|170532|1|2|IN STOCK|Y
01|170537|1|1|Delivery ETA 2 to 3 weeks A.R.O.|Y
01|170537|2|1|Includes 4th axis interfacecables from tbale to|Y
01|170537|2|2|machine bulkhead and installtion. Machine Tool will|Y
01|170537|2|3|need any control options for rotary|Y
01|170547|2|1|LABOR ON SITE AND INTERFACE COMPONENTS 4+1|Y
01|170558|2|1|.235 Coolant Drill|Y
01|170558|3|1|Reamer Collets|Y
01|170564|1|1|Tooling Certificate Number: 13705TA-3071-101121|Y
01|170564|2|1|CAT40-ER20-2.76-BD|Y
01|170564|2|2|CAT40 ER20 Collet Chuck High Torque Bearing Nut|Y
01|170564|3|1|CAT40-ER20-4.00-BD|Y
01|170564|3|2|CAT40 ER20 Collet Chuck High Torque Bearing Nut|Y
01|170568|1|1|Includes: Junction Box External/Interface Cables Amp|Y
01|170568|3|1|Includes: Junction Box External/Interface Cables Amp|Y
01|170571|1|1|C1SB115 M-4774 -Rotary Cylinder|Y
01|170577|1|1|Please Note: If RFID chips are to be installed once|Y
01|170577|1|2|a purchase order is placed it cannot be cancelled|Y
01|170577|1|3|or returned.|Y
01|170577|2|1|Quoted at NET price.|Y
01|170585|2|1|Req. INS/To check Sharp Edge *Ref. Hiro's Email on 1/17|Y
01|170585|3|1|Req. INS/To check Sharp Edge *Ref. Hiro's Email on 1/17|Y
01|170589|2|1|Delivery is about 1wk upon confirmation of specs|Y
01|170589|2|2|NET charge|Y
01|170590|1|1|Customer PO by 12/10/21 the following is the ETA:|Y
01|170590|1|2|25 pieces in Stock at Nikken; 110 are in Production|Y
01|170590|1|3|Balance of new lot Mid to End February'22|Y
01|170590|11|1|13 pieces in production; new lot Mid to End Feburary'22|Y
01|170597|1|1|Serie: 20726T // Substitution|Y
01|170597|1|2|Machine DMG moriseiki Milltap 700|Y
01|170597|1|3|Siemens Control|Y
01|170605|1|1|Reference RGA#TOR-57790/|Y
01|170605|1|2|Repair of PF-2|Y
01|170605|5|1|Calibration service included|Y
01|170605|7|1|Repair of PF-2|Y
01|170605|10|1|Calibration service included|Y
01|170614|1|1|Tooling Certificate Number: 13705TA-3071-101121|Y
01|170619|2|1|Set external Cable PWD and FDB|Y
01|170622|1|1|Pendiente Dibujo de usillo p/Cotizar Block Stop|Y
01|170622|1|2|Pendiente confirmacion de altura Pin Locator|Y
01|170622|1|3|e|N
01|170622|4|1|Pendiente Dibujo de usillo p/Cotizar Block Stop|Y
01|170622|4|2|Pendiente confirmacion de altura Pin Locator|Y
01|170625|3|1|Coolant back-up screw and coolant tube installed|Y
01|170633|1|1|10 to 12 Weeks Delivery|Y
01|170636|1|1|4 week Delivery|Y
01|170637|6|1|Replacment for standared Heat ring in Kit|Y
01|170637|7|1|Replacment for standared Heat ring in Kit|Y
01|170637|8|1|Replacment for standared Heat ring in Kit|Y
01|170637|9|1|Replacment for standared Heat ring in Kit|Y
01|170656|1|1|Modified to swap solid nut with E32-Nut Bearing nut|Y
01|170656|3|1|From used inventoryshows slight wear marks|Y
01|170661|1|1|Please allow 10 to 12 weeks for delivery|Y
01|170667|3|1|Special - cannot cancel cannot return|Y
01|170685|4|1|CAT50 SPINDLE|Y
01|170685|5|1|HSK63 SPINDLE|Y
01|170685|7|1|CAT40 MASTER GAUGE|Y
01|170685|8|1|CAT50 MASTER GAUGE|Y
01|170685|9|1|HSK63 MASTER GAUGE|Y
01|170694|4|1|CAT50 SPINDLE|Y
01|170694|5|1|HSK63 SPINDLE|Y
01|170694|7|1|CAT40 MASTER GAUGE|Y
01|170694|8|1|CAT50 MASTER GAUGE|Y
01|170694|9|1|HSK63 MASTER GAUGE|Y
01|170695|1|1|Ship ETA 1 week A.R.O - this unit is in stock|Y
01|170695|2|1|Air line Kit and fittings for pnematics|Y
01|170696|4|1|CAT50 SPINDLE|Y
01|170696|5|1|HSK63 SPINDLE|Y
01|170696|7|1|CAT40 MASTER GAUGE|Y
01|170696|8|1|CAT50 MASTER GAUGE|Y
01|170696|9|1|HSK63 MASTER GAUGE|Y
01|170697|4|1|CAT50 SPINDLE W/ VACUUM CLAMPING|Y
01|170697|5|1|HSK63 SPINDLE|Y
01|170697|7|1|CAT40 MASTER GAUGE|Y
01|170697|8|1|CAT50 MASTER GAUGE|Y
01|170697|9|1|HSK63 MASTER GAUGE|Y
01|170722|3|1|Interface for FANUC VISION WIDE|Y
01|170722|5|1|Instalacion en sitio Incluye interface|Y
01|170727|1|1|Item is a specialnon-cancelable nor returnable|Y
01|170727|2|1|Item is a specialnon-cancelable nor returnable|Y
01|170765|1|1|TAR-57800|Y
01|170765|1|2|CNC260YA SN:12097C|Y
01|170774|1|1|TAR-57770|Y
01|170774|1|2|CNC-400-HFA-6  SN:1048|Y
01|170774|33|1|rotary joint center shaft|Y
01|170774|33|2|Part # CN401H051A|Y
01|170784|1|1|Reference RGA#LVR-57794/|Y
01|170784|1|2|Repair of BMT65-ER32Z-CCW s/n: 79758 05|Y
01|170784|1|3|(Mimatic# 186491)|Y
01|170784|2|1|Bearings seals o-rings input spindle and output|Y
01|170784|2|2|spindle to be replaced.|Y
01|170784|4|1|Repair of BMT65-ER32Z-CCW s/n: 77417 06|Y
01|170784|4|2|(Mimatic# 186491)|Y
01|170784|5|1|Bearings seals o-rings 2 spindle sealing threadrings|Y
01|170784|5|2|input spindle and output spindle to be replaced.|Y
01|170801|1|1|CAT40-SF5-100|Y
01|170801|1|2|CAT40 shrink fit holder 5mm GL100mm|Y
01|170801|1|3|price for 1pc|Y
01|170801|2|1|CAT40-SF5-100|Y
01|170801|2|2|CAT40 shrink fit holder 5mm GL100mm|Y
01|170801|2|3|Price for 5pcs+|Y
01|170822|1|1|CNC601AA21 S/N 6241|Y
01|170822|1|2|Basic Repair Worm Wheel Worm Screw Labor and etc.|Y
01|170822|1|3|This quote is a rough cost. A detailed quotation will|Y
01|170822|1|4|be issued after the inspection.|Y
01|170822|2|1|This can be waived with the acceptance of a repair|Y
01|170822|2|2|quotation or with the purchase of a replacement.|Y
01|170838|1|1|Pendiente Dibujo de usillo p/Cotizar Block Stop|Y
01|170838|1|2|Pendiente confirmacion de altura Pin Locator|Y
01|170838|4|1|Pendiente Dibujo de usillo p/Cotizar Block Stop|Y
01|170838|4|2|Pendiente confirmacion de altura Pin Locator|Y
01|170840|3|1|Major Dream Pro-End Mill Head 25mm 4 Teeth|Y
01|170840|3|2|VPX200R2504AM1235|Y
01|170840|6|1|Strong 4 corner tangential ground inserts|Y
01|170840|6|2|with range of breakers.  Coated VP15TF|Y
01|170840|6|3|LOGU0904020PNER-L|Y
01|170912|1|1|Include External cables Old Generation Control|Y
01|170913|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|170914|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|170917|1|1|P/N 5AX-2MT-105-120DA21FA-M|Y
01|170917|3|1|Core Charge for 5AX-2MT-105-120W SN: 1010|Y
01|170944|1|1|VDI40 LIVE DIN10889/69880 GDM65; STRAIGHT;ER32 INT/EXT|Y
01|170944|1|2|COOLANT; 1015PSI L1=92mm;1:1 GEAR RATIO; MAX80Nm;|Y
01|170944|1|3|MAX 6500 RPM; Ref Drwg#00036162; MIM Q#A2210299 ;|Y
01|170944|1|4|MIM P/N 171996|Y
01|170944|1|5|DRAWING MUST BE APPROVED BEFORE ITEM CAN BE BUILT|Y
01|170944|3|1|VDI40 LIVE DIN10889/69880 GDM65; STRAIGHT;ER32 INT/EXT|Y
01|170944|3|2|COOLANT; 1015PSI L1=92mm;1:1 GEAR RATIO; MAX80Nm;|Y
01|170944|3|3|MAX 6500 RPM; Ref Drwg#00036162; MIM Q#A22100299|Y
01|170944|3|4|MIM P/N 171996|Y
01|170944|3|5|DRAWING MUST BE APPROVED BEFORE ITEM CAN BE BUILT|Y
01|170944|5|1|VDI40 LIVE DIN10889/69880 GDM65; STRAIGHT;ER32 INT/EXT|Y
01|170944|5|2|COOLANT; 1015PSI L1=92mm;1:1 GEAR RATIO; MAX80Nm;|Y
01|170944|5|3|MAX 6500 RPM; Ref Drwg#00036162; MIM Q#A22100299 ;|Y
01|170944|5|4|MIM P/N 171996|Y
01|170944|5|5|DRAWING MUST BE APPROVED BEFORE ITEM CAN BE BUILT|Y
01|170945|1|1|Cable set for CNC180FA S/N 15544 Length 3150mm|Y
01|170947|17|1|Please Note: We can offer a free retention knob with|Y
01|170947|17|2|the purchase of the matching taper holder.|Y
01|170952|1|1|RGA#CUR-57802/|Y
01|170952|1|2|Repair of PRE-PART-04212 s/n: 5690|Y
01|170952|2|1|Case fan|Y
01|170959|1|1|Inspection 5AX201SA-BR2|Y
01|170960|1|1|Drawing Part #SF5.9-C16-121|Y
01|170960|1|2|Quoted at NET price|Y
01|170968|1|1|Ships 2 to 3 weeks A.R.O.|Y
01|170968|1|2|High Speed Table|Y
01|170968|2|1|Standard Table|Y
01|170968|2|2|In Stock  ships 2 to 3 weeks A.R.O.|Y
01|170968|3|1|4th axis Interface includes Axis Ampcables from Amp|Y
01|170968|3|2|To Machine Bulkhead Power and Feed Back Cables from|Y
01|170968|3|3|Table to Machine Bulkhead Installation|Y
01|170983|25|1|Add in mod log to convert from CAT40-SK6-90UP-IDU|N
01|170984|2|1|verifying DIN mod charge and lead with service|Y
01|170996|1|1|CAT50 AGH; CAPTO C5 OUTPUT A=80mm; L=260mm; L1=152mm|Y
01|170996|1|2|1:1 GEAR Max 150Nm Max 5000 RPM|Y
01|170996|1|3|Ref: DRWG #00046636 140066 will change ARO|Y
01|170996|1|6|3 weeks Design 10 weeks mfg after signed approval drwg|Y
01|170996|1|7|plus 1-2 weeks shipping|Y
01|171011|3|1|This tool has a 2.0 gage length.|Y
01|171023|1|1|Table in Stock OSP300 ships 2 to 3 weeks A.R.O.|Y
01|171023|1|2|Includes Power and Feedback Cables from Nikken Table|Y
01|171023|1|3|to machine bulkhead.|Y
01|171023|2|1|Table in stock OSP300  ships 2 to 3 weeks A.R.O.|Y
01|171023|2|2|Includes Power and feedback cables from Nikken Table|Y
01|171023|2|3|to Machine Bulk Head|Y
01|171034|25|1|Add in mod log to convert from CAT40-SK6-90UP-IDU|N
01|171052|1|1|P/N: NC5007-0016-6.30 DIN|Y
01|171052|1|2|special CAT50 Dual Contact ER16 Collet Chuck w 6.30 GL|Y
01|171052|1|3|and DIN modified.|Y
01|171052|2|1|Same holder with  smooth nut E16-NUT-G|Y
01|171054|1|1|This item is considered special once ordered cannot|Y
01|171054|1|2|be cancelled or returned.|Y
01|171061|1|1|Replaces NIK-1555-300|Y
01|171065|1|1|Mentioned price will go up to $444 after the 22nd|Y
01|171078|10|1|NOT AVAILABLE IN COOLANT SEALED|Y
01|171091|1|1|BT45-SK10-90 >> BT45 SK10 Slim Chuck 15000rpm|Y
01|171091|1|2|90mm Gage Length >> Minimum Order 6-PCS|Y
01|171091|3|1|BT45-SZF10-90 >> BT45 Bulls Eye Zero Fit Slim Chuck|Y
01|171091|3|2|SK10 90mm Gage Length >> Minimum Order 6-PCS|Y
01|171095|3|1|Installation includes: Drive unit short bar fiber|Y
01|171095|3|2|optic cable communications cable bulkhead cables|Y
01|171095|3|3|external cables service time and travel.|Y
01|171105|1|1|Final part number BT40-SF12-90CP-IDI|Y
01|171121|2|1|Installation includes: Dual axis drive unit short bar|Y
01|171121|2|2|fiber optic cables bulkhead cables external cables|Y
01|171121|2|3|parameter changes service time and travel.|Y
01|171121|2|4|Installation will take two days each machine.|Y
01|171121|2|5|Fanuc additional axis software is not inlcuded.|Y
01|171121|2|6|Fanuc additional axis software option must be purchased|Y
01|171121|2|7|the Fanuc by Linamar.|Y
01|171121|2|8|Ladder for two additional axis must be present.|Y
01|171135|2|1|wrench for holder if do not already have one|Y
01|171194|1|1|Cross for the MD Tooling MNL0020140 and the|Y
01|171194|1|2|WTO 42014001060|Y
01|171194|2|1|Cross for MNL0020140 and 42014001060 but with|Y
01|171194|2|2|10000 Max RPM's|Y
01|171194|3|1|Cross for MNL0830232|Y
01|171194|4|1|Cross for MNL0830232 with 10000 Max RPM's|Y
01|171194|5|1|Cross for WTO 42054001660|Y
01|171198|1|1|5% discount added for coolant setup|Y
01|171201|6|1|Please refer to drawing for confirmation of dimensions|Y
01|171211|1|1|20 HSK63A Heat shrink.750 Dia.  - 3.15 overall length|Y
01|171211|1|2|*Without length adjusting thread!! Not enough length.|Y
01|171211|1|3|Part # H63A-SF0750-3.15|Y
01|171211|2|1|20 HSK63A Heat shrink.750 Dia.  - 3.15 overall length|Y
01|171211|2|2|W/COOLANT PORTS- *Without length adjusting thread!!|Y
01|171211|2|3|Part # H63A-SF0750-3.15CP|Y
01|171222|1|1|For MAZAK Poland|Y
01|171239|2|1|Cable for CNCB630ZA-M|Y
01|171242|1|1|Qty to be either 6 or 12|Y
01|171249|7|1|Spindle wrench for items 1 and 3|Y
01|171249|8|1|Wrench for nut on items 1 and 3|Y
01|171249|9|1|Spindle wrench for items 2 4 5 and 6|Y
01|171249|10|1|Wrench for nut on items 2 4 5 and 6|Y
01|171257|1|1|SP Mfg Cost Included.|Y
01|171259|1|1|Direct Cable + R/Joint|Y
01|171259|4|1|Mitsubishi Motor HF354S/A51|Y
01|171259|7|1|CNCZ321MA Disassemble Washing and Inspection Fee.|Y
01|171259|7|2|If you purchase a new table we will deny this cost.|Y
01|171265|1|1|CAT50 5/16 Shrink-3.38 GL|Y
01|171265|1|2|C6Y3-0312 (old command part #)|Y
01|171265|1|3|CAT50-SF0312-3.38CP|Y
01|171265|4|1|CAT50 5/8 SHRINK-3.63 GL|Y
01|171265|4|2|C6Y3-0625|Y
01|171265|4|3|CAT50-SF0625-3.63CP|Y
01|171265|5|1|CAT50 3/4 SHRINK-3.63 GL|Y
01|171265|5|2|C6Y3-0750|Y
01|171265|5|3|CAT50-SF0750-3.63CP|Y
01|171265|6|1|CAT50 1in SHRINK-3.63 GL|Y
01|171265|6|2|C6Y3-1000|Y
01|171265|6|3|CAT50-SF1000-3.63CP|Y
01|171265|7|1|CAT50 5/16 SHRINK-5.00 GL|Y
01|171265|7|2|C6Y4-0312|Y
01|171265|7|3|CAT50-SF0312-5.00CP|Y
01|171265|8|1|CAT50 3/8 SHRINK-5.00 GL|Y
01|171265|8|2|C6Y4-0375|Y
01|171265|8|3|CAT50-SF0375-5.00CP|Y
01|171265|10|1|CAT50 3/4 SHRINK-5.00 GL|Y
01|171265|10|2|C6Y4-0750|Y
01|171265|10|3|CAT50-SF0750-5.00CP|Y
01|171276|4|1|2 stk1 due Pending ETA|Y
01|171301|9|1|Item is Non-standard stock once a PO is received|Y
01|171301|9|2|it can not be cancelled or returned|Y
01|171302|1|1|RGA TAR-57848|Y
01|171302|1|2|CNCZ105YA SN: 3128F   Brake issue seal popping out|Y
01|171302|1|3|Table needs full rebuild and new spindle due to|Y
01|171302|1|4|coolant/water contamination/rust|Y
01|171315|1|1|Please Note: Discount reflects used non-returnable|Y
01|171315|1|2|tap holder.|Y
01|171318|1|1|Req. INS/To check Sharp Edge *Ref. Hiro's Email on 1/17|Y
01|171318|2|1|Req. INS/To check Sharp Edge *Ref. Hiro's Email on 1/17|Y
01|171321|4|1|C6-MMC12C-120-AT(in stock at factory)|Y
01|171321|5|1|we do have 1ea stockwill ask for inspection|Y
01|171321|5|2|Also on log for P&D as a back up|Y
01|171321|7|1|C6-MRAM-ER20L-IC   on Log for P&D|Y
01|171364|1|1|Refer to drawing. OAL is 7.67|Y
01|171366|7|1|HSK63A-ER16-3.00 body plus E16-NUT-SE16-SCREW(C)|Y
01|171366|7|2|New part # to be assigned|Y
01|171391|1|1|comes with 2x taper pots of customer's choice|Y
01|171392|3|1|Only Inspection of CNC202FA Without Motor|Y
01|171392|3|2|SN 26715TCN|Y
01|171416|2|1|quoted as an in stock option|Y
01|171424|1|1|TAR-57812/ 5AX-2MT-105-120FA-M SN: 8092|Y
01|171424|56|1|TCE-A4428|Y
01|171431|1|1|1st Batch/For stock 2/19/20:DWG Approved.|Y
01|171431|2|1|1st Batch/(1)865110 Yamazen/Asgard 12/18/20:DWG Aprv'd|Y
01|171431|3|1|1st Batch/For stock 6/23/21:DWG Approved/BT|Y
01|171431|4|1|Req INS/E20-NUT-G>Give to TimNeed BT DT>>WH1 upon INS|Y
01|171462|3|1|Installation includes: Drive unit short bar fiber|Y
01|171462|3|2|optic cable communications cable bulkhead cables|Y
01|171462|3|3|parameter changes service time and travel.|Y
01|171481|6|1|P/N: C4006-0250-4.00B|Y
01|171481|6|2|CAT40 1/4 Balanceable End Mill holder w 4.00 G.L.|Y
01|171481|6|3|MFG = 16-18 working weeks plus 2-4 weeks shipping time|Y
01|171481|7|1|P/N: C4006-0125-4.00B|Y
01|171481|7|2|CAT40 1/8 Balanceable End Mill holder w 4.00 G.L.|Y
01|171481|7|3|MFG = 16-18 working weeks plus 2-4 weeks shipping time|Y
01|171492|1|1|6-8 WEEKS FOR DELIVERY; WILL NEED TO ORDER MITS|Y
01|171492|1|2|MOTOR COVERS TO MATCH MACHINE.|Y
01|171492|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|171492|3|1|4TH & 5TH AXIS MITSUBISHI DRIVES|Y
01|171492|4|1|LABOR COST FOR INSTALLATION (3 DAYS)|Y
01|171492|5|1|TRAVEL EXPENSES (AIRFARE/LODGING/FOOD/CAR RENTAL)|Y
01|171500|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|171500|3|1|4TH & 5TH AXIS MITSUBISHI DRIVES|Y
01|171500|4|1|LABOR COST FOR INSTALLATION (3 DAYS)|Y
01|171500|5|1|TRAVEL EXPENSES (AIRFARE/LODGING/FOOD/CAR RENTAL)|Y
01|171505|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|171518|1|1|1st Batch/892245 JR Automation 9/21/21;DWG Approved/TR|Y
01|171518|2|1|Installed into HSK32E-SK4X2-162-BS|Y
01|171545|1|1|P/N: MZCT45-MI63X-ICE|Y
01|171545|1|2|Mazak Live VDI50; MI63: Straight;|Y
01|171545|1|3|L1=116.5mm; 1:1 GEAR; MAX 150Nm; MAX 3000RPM;|Y
01|171545|1|4|INTERNAL/EXTERNAL COOLANT 1015PSI;|Y
01|171545|1|5|ref drwg: 00031794|Y
01|171545|1|6|Mim# 168543|Y
01|171545|17|1|P/N: MZCT45-CT40X-ICE|Y
01|171545|17|2|Mazak Live; VDI50; CAT40; STRAIGHT: L1=102mm;|Y
01|171545|17|3|1:1 Gear; Max 150Nm; Max 3000RPM;|Y
01|171545|17|4|INTERNAL/EXTERNAL Coolant 1015PSI;|Y
01|171545|17|5|ref drwg#00060204|Y
01|171545|17|6|Mim#200348|Y
01|171545|34|1|P/N: MZCT45-ER40X-ICE|Y
01|171545|34|2|Mazak Live; VDI50; ER40; Straight;|Y
01|171545|34|3|L1=116.5mm; 1:1 GEAR.; MAX 150Nm; MAX 3000RPM;|Y
01|171545|34|4|INTERNAL/EXTERNAL COOLANT 1015PSI;|Y
01|171545|34|5|ref drwg# 00031794|Y
01|171545|34|6|WRENCH QUOTED SEPARATELY***|Y
01|171545|34|7|NUT WRENCH 112867|Y
01|171545|34|8|SPINDLE WRENCH 107566|Y
01|171547|12|1|Cross for CV40JT2244|Y
01|171547|13|1|cross for Jacobs 30344|Y
01|171550|7|1|NET PRICING|Y
01|171563|2|1|NO COOLANT THRU|Y
01|171563|3|1|COOLANT THRU|Y
01|171563|7|1|NET PRICING|Y
01|171563|8|1|NET PRICING|Y
01|171608|55|1|This item is special once ordered cannot be cancelled|Y
01|171608|55|2|or returned|Y
01|171608|56|1|Part # E16-020AAA ER16 Collet 5/16 (.312-.281)Ultrapre|Y
01|171608|56|2|This item is special once ordered cannot be cancelled|Y
01|171608|56|3|or returned|Y
01|171608|57|1|Part # E16-018AAA ER16 Collet 9/32 (.281-.250)Ultrapre|Y
01|171608|57|2|This item is considered special once ordered cannot|Y
01|171608|57|3|be cancelled or returned.|Y
01|171608|58|1|Part # E16-014AAA ER16 Collet 7/32 (.219-.187)Ultrapre|Y
01|171608|58|2|This item is considered special once ordered cannot|Y
01|171608|58|3|be cancelled or returned.|Y
01|171608|59|1|Part # E16-012AAA ER16 Collet 3/16 (.187-.156)Ultrapre|Y
01|171608|59|2|This item is considered special once ordered cannot be|Y
01|171608|59|3|cancelled or returned.|Y
01|171608|60|1|Part # E16-010AAA ER16 Collet 5/32 (.156-.125)Ultrapre|Y
01|171608|60|2|This item is considered special once ordered cannot be|Y
01|171608|60|3|cancelled or returned.|Y
01|171608|61|1|Part # E16-008AAA ER16 Collet 1/8 (.125-.109)Ultrapre|Y
01|171608|61|2|This item is considered special once ordered cannot be|Y
01|171608|61|3|cancelled or returned.|Y
01|171608|62|1|Part # E16-006AAA ER16 Collet 3/32 (.094-.078)Ultrapre|Y
01|171608|62|2|This item is considered special once ordered cannot be|Y
01|171608|62|3|cancelled or returned.|Y
01|171608|63|1|Part # E16-004AAA ER16 Collet 1/16 (.063-.047)Ultrapre|Y
01|171608|63|2|This item is considered special once ordered cannot be|Y
01|171608|63|3|cancelled or returned.|Y
01|171608|75|1|This item is considered special once ordered cannot|Y
01|171608|75|2|be cancelled or returned.|Y
01|171608|78|1|This item is considered special once ordered cannot|Y
01|171608|78|2|be cancelled or returned|Y
01|171608|89|1|Part # E16-016AAA ER16 Collet 1/4 (.250-.219)Ultrapre|Y
01|171608|89|2|This item is considered special once ordered cannot be|Y
01|171608|89|3|cancelled or returned.|Y
01|171608|93|1|This item is considered special once ordered cannot|Y
01|171608|93|2|be cancelled or returned.|Y
01|171619|6|1|Zip 78045|Y
01|171619|6|2|x4 skids/48 x 48 x 40 each skid|Y
01|171619|6|3|X2 skids at 600lbs//X2 Skids a 300lbs|Y
01|171620|1|1|TAR-57856/ 5AX-201FA SN: 1117|Y
01|171620|1|2|TABLE SUSTAINED CRASH AT AROUND 85 DEGREES TILT AXIS|Y
01|171620|1|3|LOCKED UP - TILT AXIS FULL REBUILD + BEARINGS/SEALS|Y
01|171626|1|1|TAR-57654|Y
01|171626|1|2|CNCZ202FA SN: N/A|Y
01|171644|1|1|Tooling Certificate #19992-3140-122021|Y
01|171645|2|1|With Sigma 1 motors installed.|Y
01|171645|2|2|Please allow 3 to 4 weeks for delivery.|Y
01|171649|1|1|SKJ25-45/64|Y
01|171649|1|2|Special order non-vcancelable/non-returnable|Y
01|171649|2|1|3 in stock in US|Y
01|171649|2|2|2 in Japan - 2-3 wks  ARO|Y
01|171649|2|3|Additional pieces 12-14 ARO|Y
01|171649|2|4|Special order non-cancelable/non-returnable|Y
01|171650|1|1|Special item non returnable|Y
01|171658|6|1|Zip 78045|Y
01|171658|6|2|x4 skids/48 x 48 x 40 each skid|Y
01|171658|6|3|X2 skids at 600lbs//X2 Skids a 300lbs|Y
01|171661|2|1|MA-600HBII OKUMA machine|Y
01|171661|2|2|Swing Box|Y
01|171661|3|1|Cables Set Direct Mount|Y
01|171671|2|1|11 in stock ETA pending on the remainder|Y
01|171676|1|1|W/ PS-17|Y
01|171676|2|1|the PS P30T-2MGH4 (BIG) crossover|Y
01|171699|1|1|Discontinued|Y
01|171699|2|1|Discontinued|Y
01|171699|3|1|Discontinued|Y
01|171701|1|1|Quoted by Hiro/For OKK Europe|Y
01|171701|2|1|Quoted by Hiro/For OKK Europe|Y
01|171732|2|1|4+1 rotary joint for Aisin|Y
01|171732|3|1|Air freight / Transit time is about 1week|Y
01|171732|3|2|if choose Boat it takes 3-4 months now|Y
01|171735|1|1|Quote valid for 30 days. After 2/1/2022 new price will|Y
01|171735|1|2|be $282.00 list|Y
01|171738|1|1|1st Batch/For stock 2/19/20:DWG Approved.|Y
01|171739|1|1|1st Batch/CBO 4/13/21:DWG pre-approved/BT|Y
01|171739|2|1|1st Batch/(1)902813 7/23/21:DWG Approved/BT|Y
01|171740|1|1|5AX-500FA-APC SN: 1113|Y
01|171740|1|2|REPAIR OF TILT AXIS SCALE HEIDENHAIN RCN727F|Y
01|171742|1|1|Req.INS/Model Change/(1)898687|Y
01|171773|1|1|D1.1/4-NPU13-6.23|Y
01|171776|11|1|A tariff surcharge may be added to this quotation in|Y
01|171776|11|2|the event of a sustained tariff increase on the|Y
01|171776|11|3|importation of this product.  Any surcharge will be|Y
01|171776|11|4|disclosed prior to acceptance of an order.|Y
01|171780|1|1|Quoted at NET price for 1-3pcs.|Y
01|171782|1|1|Req. INS/QTY Discrepancy|Y
01|171782|2|1|Req. INS/QTY Discrepancy|Y
01|171782|3|1|Req. INS/QTY Discrepancy|Y
01|171792|8|1|Alternative for C4-SF0250-2.95CP|Y
01|171792|9|1|Alterniative for C4-SF0500-2.95CP|Y
01|171792|10|1|Alterniative for C4-SF0625-3.15CP|Y
01|171792|10|2|e|N
01|171796|1|1|TAR-57770|Y
01|171796|1|2|CNC-400-HFA-6  SN:1048|Y
01|171796|3|1|Replacement Table for CNCZ400HFA-6 SN: 1048|Y
01|171796|3|2|Motor is not included due to age|Y
01|171808|1|1|Reference RGA#LVR-57863|Y
01|171808|1|2|Repair of BMT65-SK20X-ICE s/n: 20905238 01|Y
01|171808|1|3|(Mimatic#187160)|Y
01|171808|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|171808|2|2|1 spindle.|Y
01|171822|2|1|Dual contact ER20 L:9.00 L1:1.06 D:1.38|Y
01|171822|2|2|We have 28ea on hand|Y
01|171823|2|1|Will provide wrench one free wrench per machine|Y
01|171823|3|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|171823|4|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|171823|7|1|Will provide wrench one free wrench per machine|Y
01|171823|8|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|171823|9|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|171823|12|1|Will provide wrench one free wrench per machine|Y
01|171823|13|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|171823|14|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|171829|11|1|hold .250|Y
01|171829|22|1|only avail in coolant|Y
01|171831|2|1|quoted as an in stock option|Y
01|171838|1|1|Cable set from Nikken table to machine bulkhead|Y
01|171838|1|2|included with this price|Y
01|171857|2|1|2.5mm drill .157 shank diam.|Y
01|171857|3|1|5mm drill .236 shank diam|Y
01|171857|3|2|.159 drill .236 shank diam|Y
01|171857|6|1|3/8 End mill 3/8 shank diam|Y
01|171857|6|2|3/8 end mill 3/8 shank diam|Y
01|171857|8|1|.250 end mill .250 shank diam.|Y
01|171857|10|1|.500 end mill .500 shank diam|Y
01|171857|13|1|Spot drill .625 Shank - this is what we have in stock|Y
01|171857|15|1|.750 end mill 1 shank diam.|Y
01|171857|17|1|.2637 drill .315 shank diam.|Y
01|171857|17|2|.276 drill .315 shank diam.|Y
01|171857|17|3|6.6 mm drill .315 shank diam.|Y
01|171857|18|1|3/8 chamfer drill 3/8 shank diam|Y
01|171857|20|1|.1875 Engraving Tool .1875 shank diam.|Y
01|171857|25|1|for M8x1.25 and M6x1.0 Taps|Y
01|171869|1|1|External coolant only|Y
01|171869|2|1|For both internal and external coolant. Can also|Y
01|171869|2|2|run dry|Y
01|171870|3|1|This item is considered special once ordered it cannot|Y
01|171870|3|2|be returned|Y
01|171884|1|1|1st Batch 1/26/22 mfg>>4/M B|Y
01|171884|2|1|Req.INS/Model Change/(1)898687|Y
01|171892|3|1|This item is considered special once ordered it cannot|Y
01|171892|3|2|be returned|Y
01|171895|1|1|Wrench for E32-NUT on the C4047-0032-9.00|Y
01|171901|4|1|2 CAT40 POTS ARE INCLUDED AT NO COST|Y
01|171901|4|2|THIS LINE ITEM WILL NEED TO BE ON PO TO MAKE SURE|Y
01|171901|4|3|THE RIGHT POTS ARE PROVIDED.|Y
01|171910|3|1|This wrench is required to install the coolant nut/cap|Y
01|171910|3|2|as requested above|Y
01|171910|3|3|I do not show GD having ordered one in our history|Y
01|171917|3|1|Spindle Stop Block|Y
01|171948|1|1|Reference RGA#LVR-57899/|Y
01|171948|1|2|Repair of MZMP47-ER32X-OFF s/n:73900 08|Y
01|171948|1|3|(Mimatic# 124021)|Y
01|171948|2|1|Bearings seals and o-rings to be replaced.|Y
01|171948|2|2|Resurface 1 output spindle and 1 input spindle.|Y
01|171951|2|1|Spindle Stop Block|Y
01|171964|1|1|1st Batch/DWG saved in Teams File.|Y
01|171964|2|1|Req. INS/Check Etching/Label# Old#W1005-0875-4.02(C)|Y
01|171969|3|1|Installation on site including FANUC components|Y
01|171973|1|1|Extra Discount Vs KOMA|Y
01|171973|2|1|Include labor on site and all FANUC components|Y
01|171973|2|2|Pending send data sheet|Y
01|171991|2|1|Price reflect Net charge|Y
01|172006|1|1|ET11-236(JIS M6)|Y
01|172006|1|2|ER11 Tap collet JIS M6|Y
01|172006|2|1|ET11-236(C) (JIS M6 Coolant)|Y
01|172006|2|2|ER11 Tap collet JIS M6 Coolant|Y
01|172010|4|1|**Includes (3) SK20 Collets - Choice of sizes|Y
01|172013|4|1|CAT40-HC16-9.00|Y
01|172013|4|2|CAT40 Hydraulic Chuck 16mm|Y
01|172026|3|1|This item will need an signed approval drawing before|Y
01|172026|3|2|the manufacturing process can begin.|Y
01|172026|3|3|Please allow extra time for the approval process.|Y
01|172030|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXIS;|Y
01|172030|6|2|INSTALLED BETWEEN BULKHEAD AND ROTARY CONNECTORS|Y
01|172030|7|1|HYDRAULIC MANIFOLD & PRESDDURE REGULATOR FOR 5C|Y
01|172030|7|2|CLOSER AIR/HYDRAULIC BOOSTER PUMP ASSEMBLY|Y
01|172030|13|1|TOOLING CERTIFICATE AT NO COST TO END USER|Y
01|172054|1|1|Double check center height = 72mm shown on drawing|Y
01|172056|1|1|Exact match to customer supplied drawing|Y
01|172056|2|1|***Not exact match to customer supplied drawing***|Y
01|172056|2|2|Holder has C/L Height of 72mm VS. 115mm on Cust drawing|Y
01|172058|1|1|Only 6 of 12ea are currently in stock|Y
01|172072|1|1|Tooling Certificate Number: 25000-3138-121721|Y
01|172084|1|1|*DIN Modified|Y
01|172084|3|1|*DIN Modified|Y
01|172112|1|1|Item Non-Cancelable. Non-Returnable|Y
01|172125|3|1|NET ea for cost of install|Y
01|172125|3|2|Modification will take approx 5-10 business days|Y
01|172135|1|1|RGA#LVR-57900/|Y
01|172135|1|2|Repair of BMT65-SK20X-ICE s/n: 18902222 05|Y
01|172135|1|3|(Mimatic# 187160)|Y
01|172135|2|1|Bearings seals o-rings and damaged output spindle|Y
01|172135|2|2|to be replaced.|Y
01|172141|1|1|RGA#LVR-57898/|Y
01|172141|1|2|Repair of MNZ20-SK16X-ICE-12K s/n:19902304 04|Y
01|172141|1|3|(Mimatic#193568)|Y
01|172141|2|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|172141|2|2|1 spindle.|Y
01|172141|4|1|RGA#LVR-57898/|Y
01|172141|4|2|Repair of MNZ20-SK16X-ICE-12K s/n:19902304 09|Y
01|172141|4|3|(Mimatic#193568)|Y
01|172141|5|1|Bearings seals and o-rings to be replaced.|Y
01|172141|7|1|RGA#LVR-57898/|Y
01|172141|7|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 19903686 07|Y
01|172141|7|3|(Mimatic#193643)|Y
01|172141|8|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|172141|8|2|1 spindle.|Y
01|172161|1|1|Reference RGA#LVR-57910/|Y
01|172161|1|2|Repair of MNZ20-SK16Z-ICE-12K s/n:19902305 04|Y
01|172161|1|3|(Mimatic#193643)|Y
01|172161|2|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|172161|2|2|1 output spindle.|Y
01|172161|4|1|Reference RGA#LVR-57910/|Y
01|172161|4|2|Repair of MNZ20-SK16Z-ICE-12K s/n:19902305 10|Y
01|172161|4|3|(Mimatic#193643)|Y
01|172161|5|1|Bearings Seals O-Rings and damaged output spindle to|Y
01|172161|5|2|be replaced. Resurface 1 output spindle.|Y
01|172161|7|1|Reference RGA#LVR-57910/|Y
01|172161|7|2|Repair of MNZ20-SK16Z-ICE-12K s/n:19902305 07|Y
01|172161|7|3|(Mimatic#193643)|Y
01|172161|8|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|172161|8|2|1 output spindle.|Y
01|172161|10|1|Reference RGA#LVR-57910/|Y
01|172161|10|2|Repair of MNZ20-SK16Z-ICE-12K s/n:19903686 08|Y
01|172161|10|3|(Mimatic#193643)|Y
01|172161|11|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|172161|11|2|1 output spindle.|Y
01|172161|13|1|Reference RGA#LVR-57910/|Y
01|172161|13|2|Repair of MNZ20-SK16Z-ICE-12K s/n:19903686 01|Y
01|172161|13|3|(Mimatic#193643)|Y
01|172161|14|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|172161|14|2|1 input & output spindle|Y
01|172161|16|1|Reference RGA#LVR-57910/|Y
01|172161|16|2|Repair of MNZ20-SK16Z-ICE-12K s/n:19902305 03|Y
01|172161|16|3|(Mimatic#193643)|Y
01|172161|17|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|172161|17|2|1 output spindle|Y
01|172161|19|1|Reference RGA#LVR-57910/|Y
01|172161|19|2|Repair of MNZ20-SK16X-12K s/n:19903864 07|Y
01|172161|19|3|(Mimatic#193569)|Y
01|172161|20|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|172161|20|2|1 spindle|Y
01|172161|22|1|Reference RGA#LVR-57910/|Y
01|172161|22|2|Repair of MNZ20-SK16X-ICE-12K s/n:19902304 16|Y
01|172161|22|3|(Mimatic#193568)|Y
01|172161|23|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|172161|23|2|1 spindle|Y
01|172161|25|1|Reference RGA#LVR-57910/|Y
01|172161|25|2|Repair of MNZ20-SK16X-ICE-12K s/n:19902304 26|Y
01|172161|25|3|(Mimatic#193568)|Y
01|172161|26|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|172161|26|2|1 spindle|Y
01|172175|6|1|HSK63A-SLS8-80|Y
01|172178|5|1|Center Height: 135mm 170mm FP Brake: 205Nm @ 0.5mpa A|Y
01|172179|4|1|NBT30-SF14-65|Y
01|172199|1|1|Tooling Certificate Number 13687-3019-072321|Y
01|172207|1|1|Calibration service and realignment for Sethy Six|Y
01|172207|1|2|s/n:6196 and repair of camera on E236N s/n:unknown|Y
01|172207|1|3|This is a time based estimate.|Y
01|172207|1|4|Any other expenses (gas meals etc.)to be charged as|Y
01|172207|1|5|needed. We will invoice the actual amount after the|Y
01|172207|1|6|service call is complete.|Y
01|172207|2|1|Camera repair for E236N s/n:unknown|Y
01|172210|1|1|Please Note Holders Are Non-Returnable/Non Cancelable|Y
01|172216|4|1|Wrench handle and attachment for smooth nut holder|Y
01|172216|7|1|In stock option to back ordered drill chuck|Y
01|172216|9|1|In stock option to back ordered drill chuck|Y
01|172225|2|1|Include Labor on Site and FANUC components|Y
01|172225|2|2|Interface Fanuc HYUNDAI|Y
01|172227|29|1|this is included in H-BO-QC-059.|Y
01|172227|29|2|customer doesn't need to order it separately when they|Y
01|172227|29|3|order H-BO-QC-059|Y
01|172227|30|1|TCS-483D / for H-BO-QC-059|Y
01|172227|30|2|this is an insert tip that customer needs to supply|Y
01|172230|1|1|Discount is with Core Trade in|Y
01|172232|2|1|SPINDLE FACE DRAWING AND/OR SPINDLE MEASUREMENTS|Y
01|172232|2|2|REQUIRED TO MANUFACTURE POSITIONING BLOCK|Y
01|172246|2|1|SPINDLE FACE DRAWING AND/OR SPINDLE MEASUREMENTS|Y
01|172246|2|2|REQUIRED TO MANUFACTURE POSITIONING BLOCK|Y
01|172262|5|1|Laredo tx|Y
01|172268|1|1|WZ PS-132|Y
01|172268|3|1|wz PS-73|Y
01|172268|5|1|wz PS-123E|Y
01|172284|1|1|This item is being discontinued and there is 1 left on|Y
01|172284|1|2|the shelf.  It's replacement is quoted on the next line|Y
01|172304|1|1|There is an 8 week lead time on this item plus shipping|Y
01|172309|1|1|Replacement collet for item purchased on original|Y
01|172309|1|2|PO422624|Y
01|172323|1|1|Special item not cancelable nor returnable|Y
01|172323|2|1|Part #M7HZ-70VR D70/80 boring bar unit for ZMAC70-VR|Y
01|172323|2|2|Special item is not cancelable nor returnable|Y
01|172323|3|1|Part #M10HZ-85VR D90 boring unit for ZMAC85-VR|Y
01|172323|3|2|Special item is not cancelable nor returnable|Y
01|172323|4|1|Part #D100/120 boring unit for ZMAC100-VR|Y
01|172323|4|2|Special item is not cancelable nor returnable|Y
01|172326|1|1|Convert from in stock hi speed|Y
01|172327|1|1|** SPECIAL PRICING **|Y
01|172327|1|2|5TH AXIS TO RETURN ORIGINAL AND L/N TRY TO REPAIR|Y
01|172331|1|1|Req. INS/Install S1/4-28X1/4|Y
01|172331|2|1|Req. INS/Install S3/8-24X5/16|Y
01|172331|3|1|1st Batch/Stock 2/2/22:DWG Saved in Teams File.|Y
01|172331|4|1|Req. INS/Install S7/16-20X3/8|Y
01|172331|5|1|Req. INS/Install S5/8-18X1/2|Y
01|172331|6|1|Req. INS/Install E16-NUT & ER16-SCREW(C)|Y
01|172331|7|1|Req. INS/Install E20-NUT & ER20-SCREW(C)|Y
01|172331|8|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|172331|9|1|1st Batch/(2)901248 Max Tool/Wheel Pros|Y
01|172331|10|1|1st Batch/Metal Removal/Titan PRJ *DWG Saved Teams File|Y
01|172331|11|1|1st Batch/898323 Wm F Hurst 11/5/21:DWG Approved/Custom|Y
01|172331|12|1|1st Batch/898323 Wm F Hurst *SAB STD|Y
01|172331|13|1|1st Batch/898323 Wm F Hurst 11/5/21:DWG Approved/Custom|Y
01|172331|14|1|1st Batch/898323 Wm F Hurst 11/5/21:DWG Approved/Custom|Y
01|172331|15|1|1st Batch/898323 Wm F Hurst 11/5/21:DWG Approved/Custom|Y
01|172331|16|1|1st Batch/898328 Install ER11-SCREW(C) 11/19:DWG Aprv'd|Y
01|172331|17|1|1st Batch/Install 11/NANUT & ER11-SCREW(C)|Y
01|172331|18|1|1st Batch/898393 Greentec  11/5/21:DWG Approved/Custome|Y
01|172331|19|1|1st Batch/Install E20-NUT-G & ER20-SCREW(C)|Y
01|172331|20|1|1st Batch/899168 Trinity/GKN-NY *DWG Aprv'd TR/GKNphone|Y
01|172345|1|1|3ea stock more on the way|Y
01|172345|3|1|In stock option. Shorter GL|Y
01|172383|5|1|Price Installation same week|Y
01|172404|1|1|Item is non standard stock.Not cancelablnor returnable|Y
01|172416|4|1|HSK40E-C20-100G|Y
01|172422|1|1|BMT45-ER16-AD-ICE  BMT45 Live ER16 STRT Adjustable ICE|Y
01|172436|5|1|(2) Wrenches required.|Y
01|172447|1|1|TAR-57885 REPAIR OF 5AX-2MT-105-120WA21|Y
01|172447|41|1|External Cable Set|Y
01|172447|41|2|** Customer need to provide pictures of existing cables|Y
01|172452|2|1|Include Labor on Site and Fanuc interface|Y
01|172473|2|1|Includes: Three position toggle switch with neutral|Y
01|172473|3|1|Includes manual activation switch|Y
01|172489|1|1|B4007-0020-4.00-G BT40 ER20 Collet Chuck W/E20-NUT-G|Y
01|172489|1|2|installed.|Y
01|172489|2|1|B4007-0020-6.00-G BT40 ER20 Collet Chuck W/E20-Nut-G|Y
01|172489|2|2|installed.|Y
01|172498|1|1|Unit in stock ships 2 to 3 weeks A.R.O.|Y
01|172498|1|2|Cables from Nikken Table to machine bulkhead are|Y
01|172498|1|3|included|Y
01|172498|4|1|Includes 4th axis Interface and Installation by|Y
01|172498|4|2|Lyndex Nikken|Y
01|172504|4|1|Quoted as an in stock toption to line 2|Y
01|172504|8|1|Quoted as an in stock option to line 6|Y
01|172515|1|1|Installation includes: Dual axis drive unit short bar|Y
01|172515|1|2|fiber optic cables communications cables bulkhead|Y
01|172515|1|3|cables paremeter changes service time and travel|Y
01|172517|2|1|Dual contact NCAT40 RAH|Y
01|172517|2|2|Once ordered this item is non returnable and non|Y
01|172517|2|3|cancellable.|Y
01|172527|1|1|EM55-HF20Z-ICE/MIMATIC 190488/ EMAG O55 Live|Y
01|172527|1|2|90DEG HYFROFLEX/INT/EXT COOLANT/ ICE/1:1 GEAR MAX 70Nm|Y
01|172527|1|3|10K RPM/ REF DRWG # 00051645|Y
01|172527|2|1|EM55-HF20X-ICE / MIMATIC 190396 / EMAG O55 Live|Y
01|172527|2|2|STRT; HYFROFLEX/INT/EXT COOLANT/ ICE /1:1 GEAR 70nm MAX|Y
01|172527|2|3|10K RPM / REF DRWG # 00051547|Y
01|172527|5|1|EM55-HF20X-OFF-ICE-HS2 /MIMATIC 193426|Y
01|172527|5|2|EMAG O55 Live; STRT OFFSET V=50mm; HYFROFLEX|Y
01|172527|5|3|L1=124mm /INT/EXT COOLANT/ ICE / 1:2 GEAR MAX 40Nm|Y
01|172527|5|4|MAX INPUT 5K RPM; MAX OUTPUT 10K RPM /REF DRWG#00054447|Y
01|172527|6|1|EM55-HF20X-OFF-ICE-HS2|Y
01|172527|6|2|MIMATIC 193426|Y
01|172527|7|1|EM55-HF20X-OFF-ICE-HS2|Y
01|172527|7|2|193426|Y
01|172527|10|1|EM55-HF20X-OFF-ICE-GR2 // MIMATIC 193427|Y
01|172527|10|2|EMAG O55 Live; STRT OFFSET V=50mm; HYFROFLEX|Y
01|172527|10|3|REF DRWG # 00054463|Y
01|172527|11|1|EM55-HF20X-OFF-ICE-GR2 /193427|Y
01|172527|12|1|EM55-HF20X-OFF-ICE-GR2 / MIMATIC 193427|Y
01|172527|15|1|EM55-SB22X / MIMATIC 193425|Y
01|172527|15|2|EMAG O55 Live SB22mm Saw X-Axis STRT ExtClnt|Y
01|172527|16|1|EM55-SB22X // 193425 MIMATIC|Y
01|172527|17|1|EM55-SB22X // 193425|Y
01|172527|17|2|`|N
01|172527|19|1|HF25-20-44 // MIMATIC 113056 // Hydrofex 20/25-44|Y
01|172533|1|1|Req. INS/Install S1/4-28X1/4|Y
01|172533|2|1|Req. INS/Install S3/8-24X5/16|Y
01|172533|3|1|Req. INS/Install E16-NUT & ER16-SCREW(C)|Y
01|172533|4|1|Req. INS/Install S7/16-20X3/8|Y
01|172533|5|1|Req. INS/Install E16-NUT & ER16-SCREW(C)|Y
01|172533|6|1|Req. INS/Install E20-NUT & ER20-SCREW(C)|Y
01|172533|7|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|172533|8|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|172533|9|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|172539|2|1|Requiere dibujo de husillo|Y
01|172541|1|1|Extra Discount vs Haimer|Y
01|172564|3|1|1-1/4 D Dimension|Y
01|172564|4|1|1 D DIAMETER|Y
01|172564|5|1|1-1/4 D DIAMETER|Y
01|172566|1|1|RGA#LVR-57891/|Y
01|172566|1|2|Repair of BMT65-ER32Z-MS s/n: 19907802 02|Y
01|172566|1|3|(Mimatic#186493)|Y
01|172566|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|172566|2|2|1 output spindle.|Y
01|172571|1|1|Spindle Stop Block to go with ER20 Right Anglehead|Y
01|172571|1|2|Net Price|Y
01|172579|1|1|Air Solenoid and Clamp/Unclamp Switches for Chuck|Y
01|172579|3|1|Misc Fittings/Air Lines and Hardware|Y
01|172582|2|1|OS-W1.9D9.8N70 & OH-KM100020 are included.|Y
01|172584|1|1|Part # will be H63A-SF0187-6.30CP|Y
01|172584|1|2|HSK63A Shrink Fit 3/16 6.30GL IDChipHole Coolant Port|Y
01|172584|1|3|Special non cancelablenon returnable|Y
01|172591|1|1|*1 pc is Demo Tool already on hand invoice only.|Y
01|172591|2|1|Already on hand invoice only.|Y
01|172591|3|1|Already on hand invoice only.|Y
01|172606|1|1|Req.INS/Install E16-NUT B/U Screw should be included.|Y
01|172606|2|1|1st Batch/Stock 9/29/21: Approved by Tim|Y
01|172606|3|1|Req.INS/For stockESD 12/E BOAT|Y
01|172606|4|1|Req.INS/ESD 12/E BOAT|Y
01|172607|1|1|1st Batch/For stock 2/19/20:DWG Approved.|Y
01|172619|1|1|5AX-500FA-APC SN: 1114|Y
01|172619|1|2|TAR-57931|Y
01|172624|1|1|Includes OH-KM050012|Y
01|172628|4|1|Service includes: Connecting/wiring & testing system.|Y
01|172628|4|3|** M-code options must be enabled prior to arrival **|Y
01|172629|3|1|*OPTIONAL*-Lyndex-Nikken to design and make positioning|Y
01|172629|3|2|block to match customer's specified machine. (Mori DV)|Y
01|172634|2|1|Stock alternative for CAT40-SK10-180U-IDU|Y
01|172639|2|1|Replacement for discontinued MNZ20-SK16X-12K|Y
01|172644|2|1|Extra Service Cost.|Y
01|172644|2|2|This item will be charged for each additional day of|Y
01|172644|2|3|check-up service.|Y
01|172661|1|1|RGA#LVR-57930/|Y
01|172661|1|2|Repair of MNL12-ER32Z s/n:A0518 (Alps#T32207)|Y
01|172661|2|1|Bearings o-rings collet nutsgears and spindle to be|Y
01|172661|2|2|replaced.If spindle can be reused the total cost will|Y
01|172661|2|3|be $1608.80 instead.|Y
01|172669|1|1|Extra 10% Quote out of other promos|Y
01|172669|1|2|Include External cables|Y
01|172670|1|1|Standard holder quoted we don't carry taper plus|Y
01|172670|2|1|Standard holder quoted we don't carry taper plus|Y
01|172670|3|1|Standard holder quoted we don't carry taper plus|Y
01|172681|1|1|Replaces C4016-0125-4.00|Y
01|172681|5|1|Replaces C4016-0375-4.00|Y
01|172681|7|1|Replaces C4016-0500-4.00|Y
01|172681|8|1|Replaces C4016-0625-4.00|Y
01|172681|9|1|Replaces C4016-0750-4.00|Y
01|172688|1|1|RAH Form must be completed for PO|Y
01|172710|1|1|Please Note: This item is non standard stock. Once a|Y
01|172710|1|2|purchase order is placed it cannot be cancelled or|Y
01|172710|1|3|returned.|Y
01|172710|2|1|Please Note: This item is non standard stock. Once a|Y
01|172710|2|2|purchase order is placed it cannot be cancelled or|Y
01|172710|2|3|returned.|Y
01|172710|4|1|Please Note: This item is non standard stock. Once a|Y
01|172710|4|2|purchase order is placed it cannot be cancelled or|Y
01|172710|4|3|returned.|Y
01|172710|5|1|Please Note: This item is non standard stock. Once a|Y
01|172710|5|2|purchase order is placed it cannot be cancelled or|Y
01|172710|5|3|returned.|Y
01|172710|9|1|Please Note: This item is non standard stock. Once a|Y
01|172710|9|2|purchase order is placed it cannot be cancelled or|Y
01|172710|9|3|returned.|Y
01|172710|10|1|HSK100A-C32-300  HSK100A 32mm Milling Chuck  300mm gage|Y
01|172710|10|2|length.|Y
01|172710|10|3|Please Note: This item is non standard stock. Once a|Y
01|172710|10|4|purchase order is placed it cannot be cancelled or|Y
01|172710|10|5|returned.|Y
01|172710|12|1|S32-SK13-250 Straight Shank Extension SK13|Y
01|172710|12|2|Please Note: This item is non standard stock. Once a|Y
01|172710|12|3|purchase order is placed it cannot be cancelled or|Y
01|172710|12|4|returned.|Y
01|172710|13|1|S32-SK13-300 Straight Shank Extension SK13|Y
01|172710|13|2|Please Note: This item is non standard stock. Once a|Y
01|172710|13|3|purchase order is placed it cannot be cancelled or|Y
01|172710|13|4|returned.|Y
01|172712|1|1|Desc: #2 PositiveDrive Rigid Tap Collet .652x.489|Y
01|172712|1|2|16.6x12.4 13/16|Y
01|172712|1|3|Spec: .652x.489 16.6x12.4 ANSI 13/16 M20|Y
01|172723|5|1|CAT50-SCA25.4-135 >>CAT50 Stub Arbor with 135mm gage|Y
01|172723|5|2|length. Please Note: This stub mill arbor is non|Y
01|172723|5|3|standard stock. Once a purchase order is placed it|Y
01|172723|5|4|cannot be cancelled or returned.|Y
01|172730|2|1|Please order part # C4006-1500-4.50DIN-M|Y
01|172731|1|1|Extra 5% Disc Per Package|Y
01|172731|7|1|Alternativa CAT40-SF0500-3.15CP|Y
01|172731|9|1|Rigid Type recommended on 1 applications|Y
01|172740|2|1|.5 mill|Y
01|172740|3|1|.375 mill|Y
01|172740|4|1|.25 mill|Y
01|172740|5|1|.1875 mill|Y
01|172740|6|1|.3125 mill|Y
01|172740|7|1|3/4 milling chuck|Y
01|172740|8|1|.625 mill|Y
01|172740|10|1|.875 mill|Y
01|172740|11|1|.875 mill|Y
01|172740|13|1|.25 drill|Y
01|172740|13|2|.25 dia for center drill|Y
01|172740|14|1|.75 drill|Y
01|172740|15|1|.5 drill|Y
01|172740|15|2|.4990 drill|Y
01|172740|16|1|.484 drill|Y
01|172740|17|1|.375 drill|Y
01|172740|19|1|.156 drill|Y
01|172740|20|1|.201 drill|Y
01|172740|21|1|.25 tap|Y
01|172751|1|1|RGA#LVR-57915/|Y
01|172751|1|2|Repair of MNL12-ER25Y-MD s/n:A0086 (Alps#MSA01-6J000)|Y
01|172751|2|1|Bearings o-rings collet nuts and drive shaft with|Y
01|172751|2|2|gears to be replaced.|Y
01|172787|1|1|RGA#LVR-57882/|Y
01|172787|1|2|Repair of MNL12-ER32Z-MS s/n:A1914 (Alps#T32216)|Y
01|172787|2|1|Bearings o-rings collet nuts and drive shaft to be|Y
01|172787|2|2|replaced.|Y
01|172788|1|1|DIN/Form B Coolant Through the Flange Modification|Y
01|172788|1|2|NET Price|Y
01|172791|1|1|balance pending|Y
01|172791|2|1|Balance pending|Y
01|172791|3|1|Balance pending|Y
01|172795|1|1|Once we can convert Hispeed to std we can use those|Y
01|172795|1|2|ETA pending...needs within 2 weeks|Y
01|172795|2|1|In stock option|Y
01|172800|6|1|May be able to convert from standard holders to|Y
01|172800|6|2|expedite lead time.|Y
01|172812|1|1|Toling Certificate #13700TA-3134-121721|Y
01|172816|2|1|External cable PWD and FDB|Y
01|172828|2|1|Draw Screw Threading additional charge|Y
01|172828|2|2|NET price|Y
01|172834|1|1|HSK63A-SK20C-200-GJ|Y
01|172834|4|1|HSK63A-C25-150G|Y
01|172834|9|1|CCK25-14|Y
01|172834|11|1|HSK63A-SK16C-150-GJ|Y
01|172834|27|1|BT30-SK16-120P-J|Y
01|172834|32|1|BT30-SK25-90P-J|Y
01|172838|4|1|*Used to mount R-8 Chuck directly to Rotary Table.|Y
01|172838|6|1|** Pricing is based on using existing Fanuc Amp.|Y
01|172838|7|1|Cable Set - Included with Lyndex-Nikken Installation|Y
01|172838|7|2|need to purchase seperately if Methods does Install.|Y
01|172839|1|1|INCLUDES SOLENOID BLOCK 2 PROXIMITY SWITCHES|Y
01|172839|1|2|INCLUDES AIR LINES AND FITTINGS|Y
01|172846|1|1|Replacement for unrepairable chuck RGA# TOR-57960|Y
01|172846|1|2|Inspection fee waived for unrepairable chuck if|Y
01|172846|1|3|purchased.|Y
01|172847|1|1|Mimatic part # 125107|Y
01|172847|1|2|Please order Lyndex Nikken Part# MZQT47-SB10X-GH132|Y
01|172861|4|1|Installation includes: Drive unit short bar fiber|Y
01|172861|4|2|optic cable communications cable bulkhead cables|Y
01|172861|4|3|external cables paremeter changes service time and|Y
01|172861|4|4|travel.|Y
01|172861|5|1|Requires riser pneumatic or hydraulic operation|Y
01|172873|1|1|Need INS(Includes bolts?)/For Tim/To rebuild SMH in MP|Y
01|172873|2|1|1st Batch(w/ScrewOnKey)|Y
01|172873|3|1|1st Batch|Y
01|172873|4|1|1st batch|Y
01|172873|5|1|1st batch|Y
01|172896|1|1|Discontinued no direct replacement|Y
01|172901|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|172913|1|1|Please Note: HSK100A-C42-115 is non standard stock.|Y
01|172913|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|172913|1|3|or returned.|Y
01|172919|1|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|3|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|4|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|5|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|6|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|7|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|8|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|9|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|10|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|11|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|12|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|13|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|14|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|15|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|16|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|17|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|18|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|19|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|20|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|21|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172919|22|1|1st batch|Y
01|172919|23|1|1st batch|Y
01|172919|24|1|Need INS/Deadstock Purchase/Came with PressFit label?|Y
01|172924|1|1|Complete Package Includes RotaryTAT170 Tailbody|Y
01|172924|1|2|Support with air brake. Pnematic Tailstock|Y
01|172924|1|3|Martin Stallion 9/20 Table 1.250 Thick Baseplate for|Y
01|172924|1|4|assembly. Rotary will ship direct to Martin and|Y
01|172924|1|5|Martin will assemble this is included in the package|Y
01|172924|1|6|price. Freight is not included|Y
01|172924|2|1|Includes 4th axis interface (Amp power&feedback|Y
01|172924|2|2|Cables from Amp to Machine Bulkhead. Lyndex Nikken|Y
01|172924|2|3|Installation. This does not include freight|Y
01|172924|2|4|Includes Power and Feedback cables from Nikken Table|Y
01|172924|2|5|to machine bulkhead|Y
01|172932|1|1|On CBO due mid May for 1st project SO907261|Y
01|172932|1|2|For 2nd project|Y
01|172935|1|1|Re-Stock chuck 3 Jaws chant to 2 jaws model 627CBW|Y
01|172954|1|1|HSK63F-ER11-6.00|Y
01|172954|2|1|HSK63F-ER11-6.00|Y
01|172965|1|1|Special item not cancelable nor returnable once ordered|Y
01|172965|1|2|NET price ea no additional discount|Y
01|172966|8|1|This tool could replace lines 1 and 2 of this quote.|Y
01|172966|9|1|Ice alternative to Line 3|Y
01|172966|10|1|Ice alternative for line 4|Y
01|172968|5|1|Laredo Tex|Y
01|172969|1|1|TAR-57928 TAT-250 sn: 2714|Y
01|172971|1|1|TAR-57928 CNC260 sn: 7816|Y
01|172971|2|1|TAR-57928 TAT-250 sn: 2714|Y
01|172971|6|1|Replaces 51105|Y
01|172971|7|1|Replaces 6005|Y
01|172971|8|1|Replaces N-42|Y
01|172985|1|1|One time discount for them to test|Y
01|172985|1|2|Frank F. approved|N
01|172992|1|1|KM2-5/16  Straight Collet/Sleeve OD2 ID5/16|Y
01|172992|2|1|KM2-3/8  Straight Collet/Sleeve OD2 ID3/8|Y
01|172992|3|1|KM2-1/4  Straight Collet/Sleeve OD2 ID1/4|Y
01|172992|4|1|KM2-3/16  Straight Collet/Sleeve OD2 ID3/16|Y
01|172994|1|1|Replaces C4016-0125-4.00|Y
01|172994|2|1|Replaces C4016-0187-4.00|Y
01|172994|3|1|Replaces C4016-0250-4.00|Y
01|172994|5|1|Replaces C4016-0375-4.00|Y
01|172994|7|1|Replaces C4016-0500-4.00|Y
01|172994|8|1|Replaces C4016-0625-4.00|Y
01|172994|9|1|Replaces C4016-0750-4.00|Y
01|172994|21|1|Replaces C40-TOOLJAW|Y
01|172994|23|1|Replaces C4011-0750-4.00|Y
01|172996|1|1|RGA#QUA-57977/|Y
01|172996|1|2|Repair of C4005-0562-2.91|Y
01|173007|20|1|Uses the same wrench as HSK100A-SK10C-150|Y
01|173032|2|1|NBT40-C12-65|Y
01|173032|2|2|NBT40 Dual Contact 12mm Milling Chuck|Y
01|173034|1|1|Balluff data layout required for acceptance of PO|Y
01|173043|4|1|see below|Y
01|173043|4|2|sub-plate to increase center height to 230MM|Y
01|173043|5|1|Installation includes:Drive unit short bar fiber|Y
01|173043|5|2|optic cable bulkhead cables external cables|Y
01|173043|5|3|parameter changes service time and travel|Y
01|173047|4|1|E16-026AAA  ER16 Collet 13/32 (.406-.375) Ultra Precis|Y
01|173047|4|2|Balance Pending|Y
01|173047|5|1|E16-024AAA ER16 Collet 3/8 (.375-.344) Ultra Precision|Y
01|173047|5|2|Balance Pending|Y
01|173058|3|1|BT50 42mm Milling Chuck|Y
01|173065|1|1|Includes Haas motors and cables.|Y
01|173065|1|2|18 Series software - Use Sigma 5 Motors.|Y
01|173070|3|1|EXTRA 5% DISC|Y
01|173070|5|1|Include 2xAdapter Plates + Draw Bar|Y
01|173070|5|2|Each For RT|Y
01|173076|2|1|Extra Service Cost.|Y
01|173076|2|2|This item will be charged for each additional day of|Y
01|173076|2|3|check-up service.|Y
01|173078|6|1|If you go with Hyraulic the Rotary Part number|Y
01|173078|6|2|would be CNC260OSP4-M-HB same price $24300.00|Y
01|173111|2|1|COMPARABLE TO NL 001194521A|Y
01|173111|2|2|SINGLE OUTPUT X AXIS LIVE TOOL|Y
01|173111|2|3|INTERNAL/EXTERNAL COOLANT CAPABLE|Y
01|173111|3|1|SINGLE OUTPUT Z AXIS LIVE TOOL|Y
01|173111|3|2|INTERNAL/EXTERNAL COOLANT CAPABLE|Y
01|173111|4|1|COMPARABLE TO NL 001194523A FROM YOUR EMAIL|Y
01|173111|4|2|MAIN/SUB 90 DEGREE LIVE TOOL|Y
01|173111|4|3|EXTERNAL COOLANT ONLY|Y
01|173112|1|1|RGA#LVR-57763/|Y
01|173112|1|2|Repair of NK103-12000 s/n:AL0034 (Alps#NK103-12000-02)|Y
01|173112|2|1|Bearings o-rings collet nut and spindle to be|Y
01|173112|2|2|replaced. If the spindle can be reused the cost will|Y
01|173112|2|3|be $1620.26.|Y
01|173119|1|1|Cable Set for AA21|Y
01|173120|1|1|5% Adicional per package|Y
01|173123|6|1|NCAT50-SF18-80CP|Y
01|173123|6|2|NCAT50 Dual Contact Shrink Fit Holder 18mm Coolant Port|Y
01|173143|1|1|NBT30-SK10C-90-J|Y
01|173144|3|1|Ground sub plates with offset key slot for table and|Y
01|173144|3|2|tailstock.|Y
01|173144|4|1|Installation includes: Dual axis drive unit short bar|Y
01|173144|4|2|fiber optic cables communications cables bulkhead|Y
01|173144|4|3|cables external cables parameter changes service|Y
01|173144|4|4|time and travel.|Y
01|173149|25|1|* Alternate for above NCAT40-MMC12-90U-IDU *|Y
01|173160|1|1|P/N: MZCT45-CT40Z-ICE Mim# 167480|Y
01|173160|1|2|MAZAK LIVE; VDI50; CAT40; 90DEG; L1=190mm; 1:1 GEAR;|Y
01|173160|1|3|MAX 150Nm; MAX 3000RPM; INT/EXT COOLANT 1015PSI|Y
01|173160|1|4|Ref Drwg: 00025518|Y
01|173160|1|5|For Mazak Cyber Turn CT4500|Y
01|173169|5|1|Offering as an in stock to line 3|Y
01|173169|9|1|Offering as an in stock to line 7|Y
01|173172|1|1|Please Note: This item is non standard stock. Once a|Y
01|173172|1|2|purchase order is placed it cannot be cancelled or|Y
01|173172|1|3|returned.|Y
01|173172|2|1|Please Note: This item is non standard stock. Once a|Y
01|173172|2|2|purchase order is placed it cannot be cancelled or|Y
01|173172|2|3|returned.|Y
01|173172|3|1|OKEX-CAPTO4Z-MS  Okuma Live C4 Z-Axis 90Deg<Face>|Y
01|173172|3|2|BMT60  MainSub Internal Coolant|Y
01|173172|3|3|6500rpm 50Nm 70mm Center Height|Y
01|173172|3|4|Please Note: Delivery is based upon receipt of purchase|Y
01|173172|3|5|order after final approval drawing is received. Please|Y
01|173172|3|6|allow additional time for the approval drawing|Y
01|173172|3|7|process. This item is special once a purchase order|Y
01|173172|3|8|is placed it cannot be cancelled or returned.|Y
01|173172|12|1|Quoted at NET price.|Y
01|173181|1|1|P/N: QCFC80-.4331-SMO|Y
01|173181|1|2|Quick Change Flex Collet 80 Round Smooth .4331|Y
01|173183|2|1|PC-7 Center only|Y
01|173184|2|1|Quoted as an alternative to line 1. This also has a|Y
01|173184|2|2|4 GL but has been discontinued. Once ordered this|Y
01|173184|2|3|cannot be returned. We only have one left.|Y
01|173185|1|1|Pricing reflects tooling certificate purchase|Y
01|173190|1|1|Special item not cancelable nor returnable|Y
01|173190|2|1|Special item not cancelable nor returnable|Y
01|173190|3|1|Special item not cancelable nor returnable|Y
01|173190|4|1|Special item not cancelable nor returnable|Y
01|173190|5|1|Special item not cancelable nor returnable|Y
01|173190|6|1|Special item not cancelable nor returnable|Y
01|173190|7|1|Special item not cancelable nor returnable|Y
01|173190|8|1|Special item not cancelable nor returnable|Y
01|173190|9|1|Special item not cancelable nor returnable|Y
01|173190|10|1|Special item not cancelable nor returnable|Y
01|173190|11|1|Special item not cancelable nor returnable|Y
01|173190|12|1|order as KM42-10.95|Y
01|173190|12|2|Special item not cancelable nor returnable|Y
01|173196|1|1|Non pluggable is not an option.Waiting on P&D|Y
01|173196|2|1|Non pluggable stock at factory.|Y
01|173208|9|1|HSK100a-ER20S-4.00|Y
01|173208|9|2|Solid Nut Holder|Y
01|173213|1|1|Special school disc.: RT to be used for educational|Y
01|173213|1|2|purposes.|Y
01|173218|5|1|Option to combine the solid nut holder plus a bearing|Y
01|173218|5|2|nut to create a bearing nut holder|Y
01|173229|3|1|Include Hand Labor and Fanuc interface components|Y
01|173234|1|1|HSK32A / HSK32E Test Bar|Y
01|173234|1|2|Dia 25mm GL 150mm|Y
01|173240|1|1|Knob PS-N46E was installed at factory prior to shipping|Y
01|173240|4|1|NC5-46-SK16-60|Y
01|173240|4|2|NC5-46 SK16 Slim Chuck Coolant 15000rpm SP Order Item.|Y
01|173240|4|3|Knob PS-N46E was installed at factory prior to shipping|Y
01|173250|5|1|Alternativa MZQT5-OD10X|Y
01|173281|2|1|R/Table Modification fee. Includes motor/cables/labor|Y
01|173281|2|2|Fanuc Motors are in stock at our warehouse.|Y
01|173281|5|1|CNC180MA Disassemble Washing and Inspection Fee.|Y
01|173281|5|2|If you order the repair we will deny this cost.|Y
01|173284|1|1|NBT40 Dual Contact SK20 Major Dream|Y
01|173284|1|2|NBT40-MDSK20-90|Y
01|173295|1|1|CAT50-FMD19.05-214.8C-D48|Y
01|173295|1|2|standard CAT50 Taper Face Mill Holder|Y
01|173295|1|3|**NET PRICE|Y
01|173302|5|1|SPECIAL ORDER - NET PRICE QUOTED - NO FURTHER DISCOUNTS|Y
01|173302|5|2|NON-CANCELABLE/NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|173302|5|3|C40RAM-ER25-180IC-65TP|Y
01|173302|5|4|CAT40 ER25 Angle Head 65mm Pitch Tapered Pin - Coolant|Y
01|173302|5|5|MIM#187372|N
01|173304|13|1|2 new MAzaks|N
01|173310|15|1|1.5 SHANK|Y
01|173310|16|1|1.25 SHANK|Y
01|173315|7|1|Replaces part# SKN-10BJ|Y
01|173319|1|1|HSK63T-90-TH25N-80 Turning Square Tool Holder|Y
01|173319|1|2|180 Degree|Y
01|173319|2|1|HSK63T-180-TH25R-115 Turning Square Tool Holder|Y
01|173319|2|2|Right Hand|Y
01|173320|2|1|CAT50-RAK-110UA|Y
01|173320|3|1|CAT50-RAK-160UA|Y
01|173320|4|1|CAT50-RAK-210UA|Y
01|173320|5|1|CAT50-RAK-260UA|Y
01|173320|6|1|CAT50-RAK-310UA|Y
01|173320|17|1|RPC-130|Y
01|173320|18|1|RPC-180|Y
01|173320|19|1|RPC-230|Y
01|173320|22|1|MCCZ-130V|Y
01|173320|25|1|MCC-130B|Y
01|173329|1|1|HSK63A-C16-90G|Y
01|173331|4|1|**std BT40|Y
01|173331|13|1|to hold 9/64|Y
01|173335|1|1|NC5-46 & NC5-63 holder repair estimate|Y
01|173335|1|2|Labor $76 / Parts 2spacers $12x2=$24|Y
01|173335|1|3|This is an estimate based on usual holder condition|Y
01|173335|1|4|Provide fomal quote after inspection|Y
01|173335|1|5|Price will increase if additinal time and parts needed|Y
01|173337|2|1|Includes dwell toggle switches|Y
01|173338|2|1|External Cables included with price|Y
01|173346|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|173346|4|2|CABLES MADE TO ORDER BASED ON REQUIRED LENGTH FROM|Y
01|173346|4|3|BULKHEAD TO ROTARY TABLE.|Y
01|173352|1|1|Old nomenclature - C5026-0750-6.00|Y
01|173352|3|1|Old nomenclature - C5016-1000-6.00|Y
01|173353|9|1|to make for 0.0625 reamer|Y
01|173353|9|2|customer must have machined to desire size|Y
01|173353|11|1|to make for 0.093|Y
01|173353|11|2|customer must have machined to desire size|Y
01|173353|14|1|to make for 0.218|Y
01|173353|14|2|customer must have machined to desire size|Y
01|173353|18|1|to hold 0.0625 reamer|Y
01|173353|23|1|to hold 0.218|Y
01|173357|1|1|Please Note: This item is non standard stock. Once|Y
01|173357|1|2|a purchase order is placed it cannot be cancelled|Y
01|173357|1|3|or returned.|Y
01|173368|1|1|RGA#LVR-57959/|Y
01|173368|1|2|Repair of OKU-L370-X s/n: AL0177 (Alps#OK101-14000)|Y
01|173368|2|1|Bearings o-rings collet nut spindle spindle cover|Y
01|173368|2|2|gears and clutch to be replaced.|Y
01|173372|1|1|2-pcs Stock / 15-pcs 3 Weeks / Bal 43-pcs 16 Weeks|Y
01|173372|2|1|23-pcs stock / 10-pcs 3 Weeks/ 27-pcs 16 Weeks|Y
01|173381|2|1|Tool Depth of 77mm or less|Y
01|173381|3|1|Tool depth of 105mm or more|Y
01|173386|1|1|RGA#CUR-57970/|Y
01|173386|1|2|Repair of C40RA-0025M s/n:18902340 16 (Mimatic#175241)|Y
01|173386|2|1|Bearings seals o-rings and 1 damaged output spindle|Y
01|173386|2|2|to be replaced. Recondition 1 input spindle.|Y
01|173392|1|1|Please Note: This item is non standard stock. Once|Y
01|173392|1|2|a purchase order is placed it cannot be cancelled|Y
01|173392|1|3|or returned.|Y
01|173394|2|1|Discount reflects a order of 12 or more holders|Y
01|173394|4|1|Discount reflects a order of 12 or more holders|Y
01|173394|5|1|5% will be added with purchase of 12 or more holders|Y
01|173394|6|1|5% will be added with purchase of 12 or more holders|Y
01|173415|1|1|12 pcs STK & balance = 13 weeks|Y
01|173415|2|1|15 pcs = 4 wks & balance = 13 weeks|Y
01|173415|3|1|10 pcs = 9 wks & balance = 13 weeks|Y
01|173415|5|1|50pcs = 7 weeks & balance = pending|Y
01|173418|1|1|INCLUDES HAAS MOTORS|Y
01|173418|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|173418|3|1|RL96A-6790; ROCKLOCK 96MM LOW PROFILE BASE 6X7|Y
01|173418|3|2|ALUMINIUM MOUNTING FOR M10 OR 3/8 BOLTS @ 90 DEGREES|Y
01|173418|3|3|ON 185MM BC|Y
01|173418|4|1|96MM ROCKLOCK MASTER PALLET|Y
01|173419|1|1|1st Batch/For stock 11/3/21:DWG saved in Teams File|Y
01|173422|1|1|Includes: 180MM High Speed Left Hand indexer with|Y
01|173422|1|2|Nikken Alpha Alpha 21 control pendant with cable|Y
01|173422|1|3|M-code cable and power cable for the controller|Y
01|173427|16|1|Repeat to line 6|Y
01|173427|17|1|Repeat to line 7|Y
01|173436|2|1|Quoted at Net price.|Y
01|173464|1|1|HOWA HH9C100 S-1118|Y
01|173464|2|1|HOWA HH9C100 S-1118|Y
01|173464|3|1|HOWA HH9C100 S-1118|Y
01|173466|1|1|HAAS MACHINE|Y
01|173468|8|1|TID TRACKING SYSTEM|Y
01|173468|9|1|TP32 WEB APPLICATION|Y
01|173468|10|1|CUSTOM DATABASE SOFTWARE|Y
01|173470|2|1|Customer to provide dimensions to our service dept.|Y
01|173473|9|1|*Confirm per drawing*|Y
01|173477|1|1|Stock level is good|Y
01|173495|2|1|Incluye Interface Fanuc y Mano de obra en sitio|Y
01|173495|4|1|Mismo costo de interfase|Y
01|173495|4|2|No requiere unidad hidraulica|Y
01|173497|1|1|NET ea price no additional discount|Y
01|173497|1|2|4ea Type B DIN holes added|Y
01|173497|1|3|Special not cancelable nor returnable|Y
01|173503|5|1|Hydraulic Clamping.|Y
01|173503|5|2|4 riser to increase tilt angle to 0-141 degrees|Y
01|173510|6|1|Quoted at NET price.|Y
01|173545|9|1|Alternativa para C5007-0032-4.00|Y
01|173545|10|1|Alternativa para C5007-0032-8.00|Y
01|173548|1|1|L/N: part number pending|Y
01|173548|1|2|Pull Force Meter set includes CAT adapter|Y
01|173550|4|1|Cost of replacing R/Table by Two Service workers.|Y
01|173550|6|1|Cleaning Disassembly and Inspection Fees.|Y
01|173550|6|2|If you order a repair or a new table we will not|Y
01|173550|6|3|charge you for the inspection fee.|Y
01|173550|12|1|SP Modification Direct Cable & R/Joint cost included.|Y
01|173550|13|1|Mitsubishi Motor HF354S/A51|Y
01|173550|15|1|Cost of storing R/Table in L-N warehouse. $200/month.|Y
01|173559|3|1|Being used on a cmm|N
01|173570|2|1|M code installation on Brother Machine|Y
01|173573|7|1|Presetter Install and Training $1800.00 - No Charge|Y
01|173582|3|1|PENDING|Y
01|173582|5|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|173582|5|2|of spindle drawing information|Y
01|173584|6|1|CAT40-ER20-2.76BN CAT40 ER20 Collet Chuck Bearing Nut|Y
01|173584|9|1|CAT40-ER20-2.76BN  CAT40 ER20 Collet Chuck with|Y
01|173584|9|2|Bearing Nut|Y
01|173597|2|1|External Fanuc Cables PWD and FDB|Y
01|173600|1|1|EXTRA 4% Tooling Package New Machine|Y
01|173600|1|2|e|N
01|173600|3|1|EXTRA 2% Tooling Package New Machine|Y
01|173600|4|1|EXTRA 2% Tooling Package New Machine|Y
01|173600|5|1|EXTRA 2% Tooling Package New Machine|Y
01|173600|6|1|EXTRA 2% Tooling Package New Machine|Y
01|173600|10|1|Extra 2 %|Y
01|173607|6|1|Discontinued item special one time pricing cannot be|Y
01|173607|6|2|returned.|Y
01|173643|1|1|Please Note: This item is non standard stock. Once|Y
01|173643|1|2|a purchase order is placed it cannot be cancelled|Y
01|173643|1|3|or returned.|Y
01|173653|4|1|LIST PRICE QUOTE TO SHOW PART #S MUST ORDER THRU DIST|Y
01|173686|1|1|TAR-57947 CNCZ180LYA-BR-QT s/n: 20136|Y
01|173694|3|1|Quoted as an in stock option for line 1|Y
01|173694|11|1|Quoted as an in stock option for line 10|Y
01|173694|12|1|The part # requested has been discontinued this is|Y
01|173694|12|2|the closest.|Y
01|173695|1|1|3 to 4 weeks delivery after receipt of PO|Y
01|173695|2|1|6 to 8 weeks delivery after receipt of PO|Y
01|173695|3|1|3 to 4 weeks delivery after receipt of PO|Y
01|173710|1|1|1st Batch 4/15/20:DWG Approved10/7>11/5>12/3>3/18>1/21|Y
01|173710|2|1|1st Batch/For stock 4/16/20: DWG Approved.6/3>8/5>9/2|Y
01|173712|1|1|replaces C5011-0750-4.00|Y
01|173715|1|1|1st Batch/For stock 11/3/21:DWG Aprv'd/BT *Teams File|Y
01|173720|5|1|C5006-0500-8.00|Y
01|173725|1|1|Delivery has a range of 1st week of August to possibly|Y
01|173725|1|2|to mid October|Y
01|173744|1|1|Qty break: 1|Y
01|173744|2|1|Qty break: 2-3pc|Y
01|173744|3|1|qty break: 4+|Y
01|173744|3|2|part# OKEX-ER32X-OFF-ICE-GR2|Y
01|173744|3|3|OKUMA LIVE BMT60 - STRAIGHT OFFSET LIVE ER32|Y
01|173744|3|4|INT/ EXT COOLANT/ ICE|Y
01|173744|3|5|L=135mm; 1015PSI|Y
01|173744|3|6|2:1 GEAR; MAX 120Nm|Y
01|173744|3|7|MAX INPUT 9000 RPM; MAX OUTPUT 4500 RPM|Y
01|173744|3|8|**CONCEPT DRWG # 00047751/A186089 ONLY|Y
01|173744|3|9|Final drawing will be made at time of purchase|Y
01|173747|11|1|to make for 0.0625|Y
01|173747|11|2|customer must have machined to desire size|Y
01|173747|13|1|to make for 0.093|Y
01|173747|13|2|customer must have machined to desire size|Y
01|173747|15|1|to make for 0.093|Y
01|173747|15|2|customer must have machined to desire size|Y
01|173747|16|1|for 7/32  / .218|Y
01|173747|18|1|to make for 0.218|Y
01|173747|18|2|customer must have machined to desire size|Y
01|173747|19|1|for 0.0625|Y
01|173747|21|1|for .156|Y
01|173747|22|1|to hold 0.0625 reamer|Y
01|173747|26|1|to hold 7/32|Y
01|173747|28|1|to hold 0.218|Y
01|173754|1|1|Include External Cables for Rotary Table|Y
01|173766|1|1|Replacement for unrepairable chuck RGA# TOR-57960|Y
01|173766|1|2|Inspection fee waived for unrepairable chuck if|Y
01|173766|1|3|purchased.|Y
01|173777|4|1|Include Labor on site|Y
01|173777|4|2|Include Expenses|Y
01|173777|4|3|Include Fanuc Drive for Interface|Y
01|173777|4|4|Include Cables Cabinet to Blukhead|Y
01|173777|4|5|Include Bulkhead|Y
01|173777|4|6|Include External Cables RT to Bulkhead|Y
01|173782|2|1|ETA 3/5 via air|Y
01|173784|16|1|No es SELLADA!!|Y
01|173801|3|1|Installation on sie include Fanuc drive|Y
01|173801|3|2|Cable's and bulkhead|Y
01|173805|1|1|4th axis - does not include Haas Interface and Install|Y
01|173805|4|1|4th&5th axis - does not include Haas Interface|Y
01|173805|4|2|and installation|Y
01|173805|7|1|4th&5th axis - does not include Haas interface or|Y
01|173805|7|2|installation|Y
01|173813|1|1|EXTERNAL COOLANT ONLY|Y
01|173813|2|1|INTERNAL COOLANT ONLY|Y
01|173813|3|1|INTERNAL OR EXTERNAL COOLANT|Y
01|173819|1|1|TAR-57992 CNCZ180LYA-BR s/n: 20159|Y
01|173841|1|1|RGA#TOR-58027/|Y
01|173841|1|2|Repair of CAT40U-NX5-153|Y
01|173853|50|1|**Note: Need to confirm dimensions.|Y
01|173888|2|1|replaces C40SF-0125-3.15|Y
01|173889|16|1|Boquilla sellada inicia en 5 mm|Y
01|173889|17|1|Boquilla sellada inicia en 5 mm|Y
01|173904|2|1|LEA40-16|Y
01|173904|2|2|Lathe Reducing Sleeve/Bushing Nikken 40mm to 16mm|Y
01|173904|3|1|LEA40-25|Y
01|173904|3|2|Lathe Reducing Sleeve/Bushing Nikken 40mm to 25mm|Y
01|173906|1|1|HSK100A-SM1000-10.00CP|Y
01|173906|3|1|HSK100A-SM0750-10.00 --> HSK100A-SM0750-10.00CP|Y
01|173912|1|1|HSK100A-MMC8C-117-AT|Y
01|173912|1|2|HSK100 8mm Mini Mini - rear draw  117mm Gauge Length|Y
01|173912|2|1|HSK100A-MMC8C-145-AT|Y
01|173912|2|2|HSK100 8mm Mini Mini - rear draw  145mm Gauge Length|Y
01|173912|2|3|SPECIAL ONE TIME PRICE ON THIS TOOL ONLY|Y
01|173912|3|1|HSK100A-MMC12C-120-AT|Y
01|173912|3|2|HSK100 12mm Mini Mini - rear draw  120mm Gauge Length|Y
01|173912|4|1|HSK100A-MMC12C-145-AT|Y
01|173912|4|2|HSK100 12mm Mini Mini - rear draw  145mm Gauge Length|Y
01|173912|10|1|ONE TIME SPECIAL PRICING TO TRY WITH THE HOLDER.|Y
01|173912|12|1|This size is considered special once ordered cannot|Y
01|173912|12|2|be cancelled or returned.|Y
01|173919|1|1|P/N: C8-SM0750-4.00CP|Y
01|173919|1|2|C8 Taper 3/4 Shell Mill holder 4.00 g.l.|Y
01|173919|1|3|with coolant ports|Y
01|173919|2|1|Same as above volume discount for 10pcs|Y
01|173919|3|1|P/N: C8-SM0750-6.00CP|Y
01|173919|3|2|C8 Taper 3/4 Shell Mill holder 6.00 g.l.|Y
01|173919|3|3|with coolant ports|Y
01|173919|4|1|Same as above for volume discount for 10pcs|Y
01|173919|5|1|P/N: C8-SM1000-4.00CP|Y
01|173919|5|2|C8 Taper 1 Shell Mill holder 4.00 g.l.|Y
01|173919|5|3|with coolant ports|Y
01|173919|6|1|Same as above volume discount for 3 pcs|Y
01|173919|10|1|Same as above volume discount for 10pcs|Y
01|173919|11|1|P/N: C8-SM1000-6.00CP|Y
01|173919|11|2|C8 Taper 1 Shell Mill holder 6.00 g.l.|Y
01|173919|11|3|with coolant ports|Y
01|173919|12|1|Same as above volume discount for 3pcs|Y
01|173919|13|1|Same as above volume discount for 10pcs|Y
01|173919|14|1|P/N: C8-SM1250-4.00CP|Y
01|173919|14|2|C8 Taper 1.1/4 Shell Mill holder 4.00 g.l.|Y
01|173919|14|3|with coolant ports|Y
01|173919|15|1|Same as above volume discount for 3pcs|Y
01|173919|16|1|Same as above volume discount for 10pcs|Y
01|173919|17|1|P/N: C8-SM1250-6.00CP|Y
01|173919|17|2|C8 Taper 1.1/4 Shell Mill holder 6.00 g.l.|Y
01|173919|17|3|with coolant ports|Y
01|173919|18|1|Same as above volume discount for 3pcs|Y
01|173919|19|1|Same as above volume discount for 10pcs|Y
01|173936|3|1|Installation includes: Drive unti short bar fiber opt|Y
01|173936|3|2|cable communications cable bulkhead cables external|Y
01|173936|3|3|cables parmeter changes service time and travel|Y
01|173942|1|1|NC5-46-TB40-200 w/pull stud PS-N46E|Y
01|173955|1|1|RGA#CUR-57946/|Y
01|173955|1|2|Repair of C40RA-0025M s/n:75435 11 (Mimatic#175241)|Y
01|173955|2|1|Bearings seals and o-rings to be replaced.|Y
01|173972|3|1|Stallion 9/35 Heavy duty series trunnion table with a|Y
01|173972|3|2|9 x 35 single working surface flat within .001|Y
01|173972|3|3|per 20. 1.25 thick Baseplate for assembly. Mounting|Y
01|173972|3|4|holes and keyways for a Nikken CNC260 and TAT-250.|Y
01|173972|3|5|Baseplate will be made to fit specified machine tool.|Y
01|173972|4|1|Same as above but with (2) 9 x 35 working surfsaces.|Y
01|173978|5|1|Price includes PM on table while at LN Plus HYD MODS|Y
01|173978|6|1|Price is for ONE service trip to do ALL 4 VMC at once|Y
01|173978|12|1|Price includes PM on table while at LN Plus HYD MODS|Y
01|173978|13|1|Price is for TWO service trips to do in groups of 2 VMC|Y
01|173978|19|1|Price includes PM on table while at LN Plus HYD MODS|Y
01|173978|20|1|Price is for FOUR service trips to do each VMC - 1/trip|Y
01|173999|1|1|Part Number TBD >> SAUTER LIVE - VDI40 DIN5482; MI50|Y
01|173999|1|2|Straight;INT/ EXT COOLANT / ICE;L1=85mm;1:1 GEAR;|Y
01|173999|1|3|MAX 80Nm; 6000RPM;REF DRWG # 00018848|Y
01|173999|2|1|Part Number TBD >>SAUTER LIVE - VDI40 DIN5482; MI50|Y
01|173999|2|2|90DEG;CENTER BACK OFFSET;INT/ EXT COOLANT / ICE;|Y
01|173999|2|3|L1=100mm;1:1 GEAR; MAX 100Nm; 4000RPM;|Y
01|173999|2|4|REF DRWG # 00018845|Y
01|173999|4|1|SA4082-MI50X-OFF-ICE  VDI40 DIN5482 MI50 Live Tool|Y
01|173999|4|2|Straight Internal Coolant Max 4000 RPM|Y
01|173999|4|3|L1 = 85MM G/L|Y
01|173999|5|1|SA4082-MI50Z-OFF-ICE-100 >>VDI40 DIN5482 MI50 Live Tool|Y
01|173999|5|2|90 Deg OffsetInternal Coolant Max 6000 RPM|Y
01|173999|5|3|L1 = 100MM G/L|Y
01|173999|14|1|MI50 to ER40 Quick Change Collet (IC)|Y
01|174000|1|1|INCLUDES HAAS MOTORS|Y
01|174000|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|174000|3|1|RL96A-6790; ROCKLOCK 96MM LOW PROFILE BASE 6X7|Y
01|174000|3|2|ALUMINIUM MOUNTING FOR M10 OR 3/8 BOLTS @ 90 DEGREES|Y
01|174000|3|3|ON 185MM BC|Y
01|174000|4|1|96MM ROCKLOCK MASTER PALLET|Y
01|174007|1|1|HSK63A-C20 in 180-220 GL|Y
01|174007|5|1|HSK63A-SK20C-200P|Y
01|174031|12|1|to hold 5/32|Y
01|174031|13|1|to hold 1/16|Y
01|174031|14|1|to hold 7/32|Y
01|174031|16|1|to hold 9/64|Y
01|174048|1|1|C8-TB40-320|Y
01|174048|1|2|C8 Testbar 40mm Dia. GL 320mm|Y
01|174084|1|1|MIT40-SKT16C-90|Y
01|174084|2|1|MIT40-SKT16C-120|Y
01|174084|3|1|MIT40-SKT16C-150|Y
01|174084|4|1|MIT40-SKT25C-90|Y
01|174084|5|1|MIT40-SKT25C-120|Y
01|174084|10|1|MIT40-FMC22-45|Y
01|174084|11|1|MIT40-FMC22-90|Y
01|174084|12|1|MIT40-FMC27-60|Y
01|174084|13|1|MIT40-FMC27-90|Y
01|174098|1|1|C1TA140 H-492|Y
01|174113|1|1|1st Batch/For stock 2/1/21:DWG|Y
01|174113|2|1|1st Batch/(1)868146 *DWG approved|Y
01|174113|3|1|1st Batch/Give to Tim for INS DWG:Still pending 6/10|Y
01|174124|1|1|RGA#LVR-58006/|Y
01|174124|1|2|Repair of MZQT47-ER32Z-MS-C-3MP s/n:83106 02|Y
01|174124|1|3|(Mimatic#133725)|Y
01|174124|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|174124|2|2|1 input and 1 output spindle.|Y
01|174130|7|1|ETA could be appox 14 weeks.Waiting on confirmation|Y
01|174165|1|1|INS/Give 1-2pcs to SVC|Y
01|174165|2|1|INS/Give 1-2pcs to SVC|Y
01|174165|3|1|INS/Give 1-2pcs to SVC|Y
01|174165|4|1|INS/Give 1-2pcs to SVC|Y
01|174165|5|1|INS/889180 Buckeye/American Showa|Y
01|174167|1|1|No INS Req'd|N
01|174167|2|1|No INS Req'd|N
01|174167|3|1|No INS Req'd|N
01|174177|1|1|Include External Cables|Y
01|174179|1|1|NET EAspecial non-cancelablenon-returnable|Y
01|174179|1|2|Install chip holerebalance|Y
01|174179|2|1|NET ea special non-cancelable non-returnable|Y
01|174179|2|2|Install chip holerebalance|Y
01|174201|1|1|22-pcs ETA to Lyndex Nikken 04/09.|Y
01|174204|3|1|Interface Components and Hand Labor|Y
01|174204|3|2|Require Data Sheet and Electric Diagrams|Y
01|174208|3|1|NCAT40-C1.1/4SL-120UG|Y
01|174210|23|1|3 in stock ETA week of 4/21/22 on remaining pieces|Y
01|174224|1|1|CAT50 2 DIA End Mill Per UNV_5031|Y
01|174224|1|2|Please order part # C5006-2000A-3.85IDKS|Y
01|174224|2|1|CAT50 2 DIA End Mill Per UNV_5031|Y
01|174224|2|2|Please order part # C5006-2000A-3.85IDKS|Y
01|174224|3|1|CAT50 2 DIA End Mill Per UNV_5031|Y
01|174224|3|2|Please order part # C5006-2000A-3.85IDKS|Y
01|174226|1|1|HSK50A 1 Milling chuck|Y
01|174243|2|1|quoted as an in stock alternative.|Y
01|174244|1|1|1st Batch/Install E16-NUT & ER16-SCREW(C)|Y
01|174244|2|1|1st Batch/Install E32-NUT & ER32-SCREW(C)|Y
01|174244|3|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|174244|4|1|1st Batch/Install E40-NUT & ER40-SCREW(C)|Y
01|174244|5|1|1st Batch/Install E20-NUT & ER20-SCREW(C)|Y
01|174244|6|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|174244|7|1|1st Batch/Install E40-NUT & ER40-SCREW(C)|Y
01|174244|8|1|1st Batch/For stock|Y
01|174244|9|1|1st Batch/For stock|Y
01|174244|10|1|1st Batch/901480 Orizon 12/8/21:DWG Approved/Customer|Y
01|174244|11|1|1st Batch/902177 Productivity/St.Jude 1/7:Aprv'd/Custom|Y
01|174244|12|1|Req. INS/Install E16-NUT & ER16-SCREW(C)|Y
01|174244|13|1|1st Batch/Install E25-NUT & ER25-SCREW(C)|Y
01|174244|14|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|174244|15|1|1st Batch/902772 1/25/22:DWG approved by Customer|Y
01|174250|1|1|Includes: Tilt and Rotary axis motors|Y
01|174253|1|1|CAT50 2 DIA End Mill Per UNV_5031|Y
01|174253|1|2|Please order part # C5006-2000A-3.85IDKS|Y
01|174253|2|1|CAT50 2 DIA End Mill Per UNV_5031|Y
01|174253|2|2|Please order part # C5006-2000A-3.85IDKS|Y
01|174253|3|1|CAT50 2 DIA End Mill Per UNV_5031|Y
01|174253|3|2|Please order part # C5006-2000A-3.85IDKS|Y
01|174276|1|1|Option 1|Y
01|174276|2|1|option 2|Y
01|174279|2|1|These are due to arrive on 3/25|Y
01|174282|1|1|VMK16-5J  VMC16 Collet 5mm Jet Slots|Y
01|174283|3|1|This item is a non-standard stock item and is|Y
01|174283|3|2|considered special once ordered it cannot be cancelled|Y
01|174283|3|3|or returned|Y
01|174290|4|1|ETA is to our dock allow extra time for Jet Slot Mod|Y
01|174290|12|1|Part # C40-4500(H) was discontinued and replaced with|Y
01|174290|12|2|this part #.|Y
01|174291|1|1|Cannot cancel cannot return.|Y
01|174291|2|1|Cannot cancel cannot return.|Y
01|174292|1|1|Miyano ABX51/2X785600 per Drawing 124578|Y
01|174292|1|2|Part Number to Be Determined|Y
01|174292|1|3|Quoted at NET price.|Y
01|174292|2|1|Miyano ABX51/2X785600 per Drawing 124578|Y
01|174292|2|2|Part Number To Be Determined|Y
01|174292|2|3|Quoted at NET price minimum order 2 pieces.|Y
01|174292|3|1|Miyano ABX51/2X785600 per Drawing 124578|Y
01|174292|3|2|Part Number To Be Determined|Y
01|174292|3|3|Quoted at NET price minimum order 3 pieces.|Y
01|174292|5|1|Miyano ABX51/2X785600 per Drawing 123862|Y
01|174292|5|2|Part Number To Be Determined|Y
01|174292|5|3|Quoted at NET price minimum order 1 piece.|Y
01|174292|6|1|Miyano ABX51/2X785600 per Drawing 123862|Y
01|174292|6|2|Part Number To Be Determined|Y
01|174292|6|3|Quoted at NET price minimum order 2 pieces.|Y
01|174292|7|1|Miyano ABX51/2X785600 per Drawing 123862|Y
01|174292|7|2|Part Number To Be Determined|Y
01|174292|7|3|Quoted at NET price minimum order 3 pieces.|Y
01|174292|9|1|Miyano Setting Fixture Mimatic #155349|Y
01|174292|9|2|Part Number To Be Determined|Y
01|174292|10|1|Qyoted at Net Price.|Y
01|174295|5|1|Replaces the PRE-PRNT-04B080M Label printer|Y
01|174295|6|1|Replaces the PRE-PRNT-ROLL-04B080M printer label rolls|Y
01|174305|3|1|FANUC External Cables PWD and FDB|Y
01|174310|1|1|TC# 13700TA-3167-011122|Y
01|174315|4|1|Includes 4th axis Interfacedrives and wiring to|Y
01|174315|4|2|machine bulk head power and feedback cables from|Y
01|174315|4|3|Nikken Table to bulkhead installation & Travel|Y
01|174320|1|1|BT30-FMC22-90|Y
01|174320|1|2|BT30 Shell/Face Mill Holder 22mm SP Gage length 90mm|Y
01|174320|2|1|NBT30-FMC22-90|Y
01|174320|2|2|BT30 2Lock Shell/Face Mill Holder 22mm SP GL90mm|Y
01|174320|4|1|BT30-FMC22C-90|Y
01|174320|4|2|BT30 Shell/Face Mill Holder 22mm SP Gage length 90mm|Y
01|174320|4|3|Coolant Thru.|Y
01|174320|5|1|NBT30-FMC22C-90|Y
01|174320|5|2|BT30 2Lock Shell/Face Mill Holder 22mm SP GL90mm|Y
01|174320|5|3|Coolant Thru|Y
01|174329|1|1|*one-time discount|Y
01|174341|1|1|On QFstock at factory|Y
01|174341|3|1|** Order must be reveived by 3/4 to meet this ETA|Y
01|174341|3|2|If we receive the order after 3/4 ETA is 4/21|Y
01|174353|6|1|Includes new bulkhead cables parameter changes|Y
01|174353|6|2|service time and travel|Y
01|174353|6|3|Please allow 3 weeks for delivery once we receive PO|Y
01|174353|6|4|We will be using the existing amp and Diamondback will|Y
01|174353|6|5|have to modify the existing riser|Y
01|174373|2|1|FANUC Interface Kit|Y
01|174412|1|1|P/N: BMT65-CAPTO4X-ICE|Y
01|174412|1|2|Straight Unit BMT65 Capto C4; Internal Coolant;|Y
01|174412|1|3|1:1 L=65  S1=112|Y
01|174412|1|4|Mim# 197602|Y
01|174412|2|1|P/N: BMT65-CAPTO4Z-ICE|Y
01|174412|2|2|Angle Unit BMT65 Capto C4 Internal Coolant|Y
01|174412|2|3|1:1 L1=72|Y
01|174412|2|4|Mim#197603|Y
01|174421|2|1|Manifold solenoid block for VQZ2151-5YZM5X77-S2F|Y
01|174430|2|1|Size requested by customer but is coolant collet with|Y
01|174430|2|2|MINIMAL Collapse Range May not be the best option|Y
01|174430|2|3|E16-010 will cover the same range as our 9/64 collet|Y
01|174432|1|1|Tooling Certificate Number: 13700TA-3167-011122|Y
01|174445|1|1|This is SPECIAL once ordered cannot be cancelled or|Y
01|174445|1|2|returned|Y
01|174447|1|1|26mm ID|Y
01|174447|1|2|24mm ID|Y
01|174447|2|1|27mm ID|Y
01|174447|2|2|1.1/8|Y
01|174447|3|1|19mm ID|Y
01|174447|3|2|20mm ID|Y
01|174447|3|3|3/4|Y
01|174447|4|1|Closest to 13/16|Y
01|174450|3|1|*item is non-returnable non-cancelable.|Y
01|174450|4|1|*item is non-returnable non-cancelable.|Y
01|174458|5|1|2 pieces = stock|Y
01|174458|5|2|10 pieces = ship 4-6 days|Y
01|174458|5|3|balance = ship 2-3 weeks|Y
01|174460|1|1|Extra 5% Disc|Y
01|174483|25|1|Stock option to replace CAT50-C1.1/4-105U-IDU|Y
01|174485|1|1|1st Batch|Y
01|174485|2|1|1st Batch|Y
01|174501|1|1|Will need a 10mm Riser to match existing Rotary Table.|Y
01|174501|2|1|Air and Hydraulic Lines included.|Y
01|174504|2|1|Include Hand LaborInterface Components|Y
01|174509|1|1|These are non-standard stock items and considered|Y
01|174509|1|2|specials.  Once a PO has been issued these items|Y
01|174509|1|3|cannot be cancelled or returned.|Y
01|174512|1|1|P/N: H40A-SF14-160CPB-IDU|Y
01|174512|1|2|HSK40A Taper 14mm Shrink Fit Holder 160mm gauge length|Y
01|174512|1|3|with Coolant Ports  BALANCEABLE with ID Chip Hole|Y
01|174512|3|1|P/N: H40A-SF10-200CPB-IDU|Y
01|174512|3|2|HSK40A Taper 10mm Shrink Fit Holder 200mm gauge length|Y
01|174512|3|3|with Coolant Ports BALANCEABLE with ID Chip Hole|Y
01|174512|5|1|P/N: H40A-SF10-300CPB-IDU|Y
01|174512|5|2|HSK40A Taper 10mm Shrink Fit Holder 300mm gauge length|Y
01|174512|5|3|with Coolant Ports BALANCEABLE with ID Chip Hole|Y
01|174512|7|1|P/N: H40A-SF6-130CPB-IDU|Y
01|174512|7|2|HSK40A Taper 6mm Shrink Fit Holder 130mm gauge length|Y
01|174512|7|3|with Coolant Ports BALANCEABLE with ID Chip Hole|Y
01|174512|9|1|P/N: H40A-SF12-260CPB-IDU|Y
01|174512|9|2|HSK40A Taper 12mm Shrink Fit Holder 260mm gauge length|Y
01|174512|9|3|with Coolant Ports BALANCEABLE with ID Chip Hole|Y
01|174512|11|1|P/N: H40A-SF6-120CPB-IDU|Y
01|174512|11|2|HSK40A Taper 6mm Shrink Fit Holder 120mm gauge length|Y
01|174512|11|3|with Coolant Ports BALANCEABLE with ID Chip Hole|Y
01|174512|13|1|P/N: H40A-SF10-130CPB-IDU|Y
01|174512|13|2|HSK40A Taper 10mm Shrink Fit Holder 130mm gauge length|Y
01|174512|13|3|with Coolant Ports BALACEABLE with ID Chip Hole|Y
01|174512|17|1|P/N: H40A-SF16-160CPB-IDU|Y
01|174512|17|2|HSK40A Taper 16mm Shrink Fit Holder 160mm gauge length|Y
01|174512|17|3|with Coolant Ports BALANCEABLE with ID Chip Hole|Y
01|174515|1|1|Req.INS:Need to check dual contact tolerance.|Y
01|174515|1|2|5/3RY:NC4001--- per WHS. Pls ADJ as needed.|Y
01|174515|2|1|Req.INS:Need to check dual contact tolerance.|Y
01|174515|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|174515|4|1|Req.INS:Need to check dual contact tolerance.|Y
01|174515|5|1|Req.INS:Need to check dual contact tolerance.|Y
01|174515|6|1|Req.INS:Need to check dual contact tolerance.|Y
01|174515|7|1|Req.INS:Need to check dual contact tolerance.|Y
01|174526|1|1|IN STOCK -|Y
01|174549|1|1|HSK63A(80) Reamer Adapter per specs provided by Orizon|Y
01|174573|2|1|Closeout Promotion! All sales are FINAL!|Y
01|174573|2|2|This tool holder has a 2.0 gage length.|Y
01|174596|1|1|BT50 Boring bar 100mm refer to drawing|Y
01|174596|1|2|as reference for dimension to convert to BT50 taper|Y
01|174596|1|3|Pull stud referenced is PS-1100E|Y
01|174596|1|4|NET ea pricespecial non cancelable or returnable|Y
01|174596|2|1|BT50 boring bar 70mm per drawing referenced|Y
01|174596|2|2|NET price special not cancelable nor returnable|Y
01|174596|3|1|BT50 boring bar 80MMper reference drawing|Y
01|174596|3|2|NET price special not cancelable nor returnable|Y
01|174603|1|1|HSK63A-SK20C-200P|Y
01|174603|4|1|HSK63A-C25-150G|Y
01|174603|9|1|CCK25-14|Y
01|174613|1|1|P/N: TBD|Y
01|174613|1|2|CAT40 Right Angle Head with 3 Pin Support|Y
01|174613|1|3|ER32 Output External Coolant Supply Max 6500 RPM|Y
01|174613|1|4|70Nm Max Torque|Y
01|174613|1|5|Mim 140066|Y
01|174625|2|1|HSK100A Blank Bar x 18|Y
01|174625|2|2|NET ea price no additional discount|Y
01|174625|2|3|Special item non cancelable and non returnable|Y
01|174626|1|1|Includes: Table with motor control pendant with 15|Y
01|174626|1|2|cable M-code cable external cables and power cable|Y
01|174626|2|1|Includes: Table with motor control pendant with 15|Y
01|174626|2|2|cable M-code cable external cables and power cable.|Y
01|174627|1|1|REPAIR OF A21-750W CONTROLLER|Y
01|174627|1|2|CNC250LA21 SN: 4678|Y
01|174627|1|3|SUPER RAM CLEAR TO RESTORE CONTROLLER|Y
01|174627|1|4|RE-ENTER PARAMETERS AND TEST|Y
01|174633|22|1|We have $110.00 Labor per hour to inspect and rebuild|Y
01|174633|22|2|We can typically do 2 to 3 holders per hour. We will|Y
01|174633|22|3|only replace parts that need to be replaced|Y
01|174639|1|1|This is exchange for items being returned on RGA8113|Y
01|174639|1|2|Original TC 25000-2778-100920|Y
01|174643|1|1|10pc Mid-May|Y
01|174643|1|2|Any additional 10weeks from receipt of PO|Y
01|174657|9|1|ER20 6.5mm|Y
01|174657|9|2|ER20 7mm|Y
01|174663|1|1|C5006-0375-2.50 - CAT50 End Mill Holder 3/8 with|Y
01|174663|1|2|jet slot modification|Y
01|174663|3|1|C5006-0375-2.50 - CAT50 End Mill Holder 3/8 with|Y
01|174663|3|2|jet slot modification|Y
01|174677|17|1|BT30-HC12-72|Y
01|174677|17|2|BT30 12mm Hyd Chuck GL 72|Y
01|174677|18|1|HSK63A-HC12-90|Y
01|174677|18|2|HSK63A 12mm Hyd chuck GL90|Y
01|174679|1|1|RGA#TOR-58014/|Y
01|174679|1|2|Repair of PRE-PART-01PV2|Y
01|174679|2|1|Cost of repair and refurbish|Y
01|174679|3|1|Ship to Elbo Controlli in Italy ONLY.|Y
01|174688|1|1|MCAT40-C1.1/4SLF-105UG 3-LOCK|Y
01|174688|1|2|MCAT40 1.1/4 Milling Chuck High Speed Nose=69 DIN|Y
01|174692|1|1|TAR-58086|Y
01|174692|1|2|TAT-105 SN: 1939-B|Y
01|174700|1|1|AA21 Controller repair|Y
01|174700|1|2|Getting 4001 Alarm - replaced battery and reset ctrl|Y
01|174700|1|3|tested and ran with motor in shop|Y
01|174705|1|1|TAR-58086 - Quoting new tailstock|Y
01|174709|1|1|17b|Y
01|174709|2|1|17c|Y
01|174709|3|2|18a|Y
01|174709|4|1|18b|Y
01|174709|5|1|19b|Y
01|174709|6|1|19c|Y
01|174709|8|1|DC24V SOLENOID|Y
01|174720|1|1|C5006-0500-2.781-ID >> CAT50 1/2 End Mill Holder|Y
01|174720|1|2|With 2.781 Gage Length and ID Chip Hole per UNV#25|Y
01|174720|1|3|drawing. Quoted at NET price.|Y
01|174722|1|1|Like OKL3-ER20-AD but for VDI30 mount|Y
01|174722|1|2|Okuma Live ER20 STRT Adjustable VDI30 for GenosL200E MY|Y
01|174722|1|3|NET ea special non cancelable nor returnable|Y
01|174723|1|1|w/ chip BIS-C-122-04/L|Y
01|174728|1|1|C5006-0375-5.75-ID  >> CAT50 3/8 End Mill Holder|Y
01|174728|1|2|With 5.750 Gage Length and ID Chip Hole per UNV#33|Y
01|174728|1|3|drawing. Quoted at NET price.|Y
01|174731|1|1|C5006-0500-5.75-ID  >> CAT50 1/2 End Mill Holder|Y
01|174731|1|2|With 5.750 Gage Length and ID Chip Hole per UNV#34|Y
01|174731|1|3|drawing. Quoted at NET price.|Y
01|174732|1|1|C5006-0625-5.75-ID  >> CAT50 5/8 End Mill Holder|Y
01|174732|1|2|With 5.750 Gage Length and ID Chip Hole per UNV#35|Y
01|174732|1|3|drawing.  Quoted at NET price.|Y
01|174735|1|1|5 METER CABLES COME WITH ROTARY UNITS|Y
01|174735|2|1|6 PORT ROTARY UNION|Y
01|174735|5|1|INTSTALLATION CAN BE PERFORMED BY L-N AND INCLUDES|Y
01|174735|5|2|ABOVE OPTIONS|Y
01|174747|2|1|Optional - Recommended|Y
01|174752|1|1|RGA#LVR-58094/|Y
01|174752|1|2|Repair of MZMP46-ER32Z-ICE s/n:7467616|Y
01|174752|1|3|(Mimatic#124854)|Y
01|174752|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|174752|2|2|1 input & 1 output spindle.|Y
01|174761|1|1|Quoting the USED unit that is at the warehouse|Y
01|174762|1|1|Cables included|Y
01|174771|1|1|1pc pricing|Y
01|174771|2|1|part# BMT55-ER16X-HS3|Y
01|174771|2|2|BMT55 LIVE - ER16 STRAIGHT OFFSET V=13mm;|Y
01|174771|2|3|EXT COOLANT;|Y
01|174771|2|4|L=105mm;|Y
01|174771|2|5|1:3 GEAR; MAX 5Nm PER SPINDLE;|Y
01|174771|2|6|MAX INPUT 6000 RPM; MAX OUTPUT 18000RPM;|Y
01|174771|2|7|2-3pc pricing|Y
01|174783|1|1|MCAT40-C1.1/4SLF-105UG 3-LOCK|Y
01|174783|1|2|MCAT40 1.1/4 Milling Chuck High Speed Nose=69 DIN|Y
01|174786|2|1|H100A-MRAM Nikken modular angle head|Y
01|174786|3|1|NSK KC-300 attachment from Nikken modular angle head|Y
01|174795|5|1|Hoses and Fitting|Y
01|174809|1|1|Install the PS-N46E at factory|Y
01|174809|1|2|Special item non cancelable nor returnable|Y
01|174809|3|1|Install PS-123E at the factory|Y
01|174809|3|2|Special item non cancelable nor returnable|Y
01|174831|2|1|This item is considered special once ordered it can't|Y
01|174831|2|2|be cancelled or returned.|Y
01|174834|3|1|Installation includes utilizing bulkhead cables and one|Y
01|174834|3|2|amp and one new amp and external cables will be used|Y
01|174834|3|3|as well as needed parameter and control changes.|Y
01|174858|2|1|in stock option also mentioned ER32 in 9|Y
01|174873|2|1|External Cables PWD and FDB|Y
01|174876|5|1|C6-ER16-150|Y
01|174877|3|1|Fanuc interface components|Y
01|174878|3|1|HAND Labor and interface components|Y
01|174885|32|1|This knob is for the Haas Machine.|Y
01|174910|1|1|new part# C5007-0016-8.00XDIN-M|Y
01|174910|1|2|CAT50 ER16 Collet Chuck w/ Hex Nut|Y
01|174910|1|3|Modified DIN 2-holes|Y
01|174927|1|1|NBT40-C20-90|Y
01|174927|1|2|NBT40 Dual Contact 20mm Milling Chuck|Y
01|174943|1|1|R8 round|Y
01|174951|1|1|HSK100A-CZF32-115 HSK100A Zero Fit Milling Chuck 32MM|Y
01|174951|1|2|115mm Gage Length|Y
01|174959|2|1|Extra Service Cost.|Y
01|174959|2|2|This item will be charged for each additional day of|Y
01|174959|2|3|check-up service.|Y
01|174970|2|1|NET ea price no additional discounts.Customer supplies|Y
01|174970|2|2|critical dimensions to service dept to create block|Y
01|174981|5|1|This cannot be cancelled or returned once a PO has been|Y
01|174981|5|2|issued.|Y
01|174981|5|3|**NET PRICE|Y
01|174989|3|1|quoted as an in stock option.|Y
01|174991|1|1|NA40-OK|Y
01|174991|1|2|OK116-70980|Y
01|175007|4|1|This item is a non standard stock item and is|Y
01|175007|4|2|considered special. Once ordered it cannot be cancelled|Y
01|175007|4|3|or returned|Y
01|175017|1|1|Tilt axis worm screw WS-NS302R049|Y
01|175017|4|1|Worm screw housing|Y
01|175024|23|1|Quoted at NET price.|Y
01|175028|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|175032|2|1|CONTROLLER/NEW SERVO MOTOR/PENDANT|Y
01|175035|1|1|HSK63A-SK20C-200P|Y
01|175035|4|1|HSK63A-C25-150G|Y
01|175035|9|1|CCK25-14|Y
01|175037|1|1|5AX-250FA SN 1027|Y
01|175037|1|2|TABLE HAS A LOT OF SLOP AND IS BADLY WORN|Y
01|175037|1|3|NEEDS A FULL REBUILD MECHANICALLY AND SOME ELECTRICAL|Y
01|175037|1|4|ITEMS|Y
01|175037|39|1|New Tilt External Cable|Y
01|175037|40|1|New Tilt Axis Motor Cover|Y
01|175038|1|1|RGA#LVR-58116/|Y
01|175038|1|2|Repair of OKL3-ER32Z s/n:AL0028 (Alps#OK101-13000)|Y
01|175038|2|1|Bearings o-rings collet nut and spindle to be|Y
01|175038|2|2|replaced.|Y
01|175039|1|1|RGA#LVR-58057/|Y
01|175039|1|2|Repair of OK102-17000 s/n:AL263|Y
01|175039|2|1|Bearings o-rings collet nut spindle cover and|Y
01|175039|2|2|spindle to be replaced.|Y
01|175054|1|1|RGA#LVR-58072/|Y
01|175054|1|2|Repair of MNZ20-ER20Z s/n:A0110 (Alps#T32255)|Y
01|175054|2|1|Bearings o-rings collet nut and spindle to be|Y
01|175054|2|2|replaced.|Y
01|175055|5|1|SPECIAL- Non-Returnable/ Non-cancelable|Y
01|175056|5|1|This cannot be cancelled or returned once a PO has been|Y
01|175056|5|2|issued.|Y
01|175056|5|3|**NET PRICE|Y
01|175087|5|1|Max Tool responsible for Expedited Freight Charge from|Y
01|175087|5|2|factory to Lyndex Nikken warehouse FEE TBA|Y
01|175093|2|1|Fanuc software option and ladder must be present|Y
01|175112|1|1|1st Batch 4/17/21:DWG Approved10/7>1/6/22>1/13>1/28>2|Y
01|175112|2|1|1st Batch/For stock 6/23/21:DWG Approved/BT1/7/22>1/14|Y
01|175112|3|1|1st Batch/For stock 6/23/21:DWG Approved/BT11/19>1/14>|Y
01|175119|1|1|5% discount added to win order from Benz|Y
01|175119|5|1|Coolant collet alt - price match|Y
01|175123|1|1|Table requires 500psi hydraulic pressure for the brake|Y
01|175123|2|1|Support table requries 500psi for the brake system|Y
01|175123|3|1|500psi hydarulic unit for table and support table brake|Y
01|175126|17|1|OnSize 8mm Alternative Collet|N
01|175126|20|1|OnSize 4mm Alternative Collet|N
01|175129|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|175131|19|1|SPECIAL OFFER! We will GIVE AWAY 2 Pull studs for this|Y
01|175131|19|2|order only.|Y
01|175155|4|1|to machine to 1/8|Y
01|175160|3|1|ref. 155460|Y
01|175160|4|1|ref. 155441|Y
01|175160|5|1|ref. 155445|Y
01|175160|6|1|ref. 121489|Y
01|175160|7|1|ref. 121529|Y
01|175160|8|1|ref. 121525|Y
01|175160|9|1|ref. 121520|Y
01|175160|10|1|ref. 121526|Y
01|175160|12|1|FOR MI50-ER32I|Y
01|175160|13|1|For MI50-ER32|Y
01|175162|2|1|BMT45 90 Deg Saw Blade Live tool|Y
01|175162|2|2|External Coolant max 3000 rpm|Y
01|175162|2|3|Simlar to Mimatic drawing 52569|Y
01|175162|2|4|Quoted NET prices at Qty Breaks|Y
01|175162|2|5|Part# TBD|Y
01|175162|2|6|Machine: Doosan Lynx 2100Y|Y
01|175162|5|1|BMT55 90 Deg Swa Blade Live Tool|Y
01|175162|5|2|Ext Coolant 4000RPM 55Nm|Y
01|175162|5|3|Simlar to Mimatic drawing 49562|Y
01|175162|5|4|Quoted NET prices at Qty Breaks|Y
01|175162|5|5|Part# TBD|Y
01|175162|5|6|Machine: Doosan Lynx 2600Y|Y
01|175168|2|1|Part# TBD|Y
01|175168|2|2|HSK100 ER25 For Heller MCH-350|Y
01|175168|2|3|to quote Dimensions like Benz 713WFX03905E5A-48.6|Y
01|175168|5|1|part# TBD|Y
01|175168|5|2|HSK100 ER25 For Heller MCH-350|Y
01|175168|5|3|Mimatic Design Solution for Benz 713WFX03905E5A-48.6|Y
01|175168|8|1|part# TBD|Y
01|175168|8|2|HSK100 ER16 RAH 10000 RPM|Y
01|175168|8|3|Per Benz Drawing 772WSX03904E3A-95 Dimension|Y
01|175168|13|1|HSK100 ER16 RAH 10000 RPM|Y
01|175168|13|2|Mimatic Designed Solution for Benz 772WSX03904E3A-95|Y
01|175193|1|1|50% discount ok'd by Frank Fullone|N
01|175214|17|1|**Confirm Specs/ Machine**|Y
01|175217|1|1|NET ea priceno additional discount|Y
01|175217|1|2|Does not include KM adaptor|Y
01|175217|1|3|Not cancelable nor returnable.|Y
01|175217|3|1|NET ea priceno additional discount|Y
01|175217|3|2|Does not include KM adaptor|Y
01|175217|3|3|Not cancelable nor returnable.|Y
01|175217|5|1|NET ea priceno additional discount|Y
01|175217|5|2|Does not include KM adaptor|Y
01|175217|5|3|Not cancelable nor returnable.|Y
01|175217|7|1|NET ea priceno additional discount|Y
01|175217|7|2|Does not include KM adaptor|Y
01|175217|7|3|Not cancelable nor returnable.|Y
01|175217|8|1|NET ea priceno additional discount|Y
01|175217|8|2|ALL items are specials non cancelable nor returnable|Y
01|175217|8|3|once ordered|Y
01|175217|8|4|The KM adaptors are not included.|Y
01|175272|3|1|Interface Components FANUC|Y
01|175274|2|1|5/16 is not avail in VC6 series too big|Y
01|175292|1|1|1st Batch|Y
01|175297|6|1|(2) Big Plus 3/4 Milling Chucks for Direct|Y
01|175297|6|2|Chucking 3/4 End Mills|Y
01|175297|7|1|(4) Standard CAT50 3/4 Milling Chucks to Sleeve|Y
01|175297|7|2|Down to 1/2 and 5/8|Y
01|175297|10|1|(2) 1 Big Plus Milling Chucks for Direct Chucking|Y
01|175297|10|2|1 Shanks|Y
01|175297|10|3|NET PRICING ON THIS ITEM|Y
01|175298|1|1|RGA#CUR-58066/|Y
01|175298|1|2|Repair of C40-MRAM s/n:19908122 06 (Mimatic#162731)|Y
01|175298|2|1|Bearings seas and o-rings to be replaced.|Y
01|175299|2|1|In stock option offered|Y
01|175314|7|1|CAT50-SZF25-165U-IDU|Y
01|175314|7|2|CAT50 Bulls Eye Zero Fit Slim Chuck SK25 IdChipHole 15K|Y
01|175314|7|3|Price reflects a purchase order of 15-pcs. If quantity|Y
01|175314|7|4|changes we will need to re-quote.|Y
01|175317|1|1|All Collets in the Set are Stock except for the 1-1/8|Y
01|175317|1|2|Collet. This Collet will be 3-4 week delivery.|Y
01|175335|23|1|Quoted at NET price.|Y
01|175351|2|1|Includes: Drive unit short bar fiber optic cables|Y
01|175351|2|2|communications cables external cables parameter|Y
01|175351|2|3|changes service time and travel.|Y
01|175351|2|4|Installation time 1-2 Days|Y
01|175359|1|1|SK20-6P|Y
01|175359|1|2|SK20 Slim Chuck Collet 6-5.5mm Precision|Y
01|175359|2|1|SK20-7P|Y
01|175359|2|2|SK20 Slim Chuck Collet 7-6.5mm Precision|Y
01|175368|1|1|Alpha 4/5000i Servo Motor|Y
01|175368|1|2|Part # A06B-2223-B000|Y
01|175398|15|1|FOR 15/32 CUTTER SIZE; COLLET RANGE (.452-.472)|Y
01|175408|1|1|Special Item non cancelable nor returnable once ordered|Y
01|175411|5|1|Was not sure if you needed SK16 or SK20|Y
01|175414|10|1|BT30 TO KM32 ADAPTER|Y
01|175419|4|1|Adapter plate from Nikken RJ to 5th axis work holding|Y
01|175426|1|1|1st Batch 10/6/21:DWG Approved/BT Saved Teams File16-|Y
01|175426|2|1|1st Batch 11/1/21:Rev.DWG Approved/BT>>TR16-18wks(1/E~|Y
01|175426|3|1|1st Batch 10/6/21:DWG Approved/BT Saved Teams File16-|Y
01|175426|4|1|1st Batch|Y
01|175427|1|1|Sumitomo Part# NMTB30125EMH|Y
01|175430|1|1|RGA#LVR-58084/|Y
01|175430|1|2|Repair of MZMP47-ER32Z-HSC s/n:18902258 01|Y
01|175430|1|3|(Mimatic#124916)|Y
01|175430|2|1|Bearings seals o-rings gears damaged cover and|Y
01|175430|2|2|damages output spindle to be replaced.|Y
01|175437|1|1|RGA#LVR-58140/|Y
01|175437|1|2|Repair of BMT65-ER32Z-ICE s/n:76835 02|Y
01|175437|1|3|(Mimatic#186492)|Y
01|175437|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|175437|2|2|1 input spindle and 1 output spindle.|Y
01|175445|1|1|PS-N63AE pull stud|Y
01|175445|2|1|billing purposes only - installed on above holder|Y
01|175445|4|1|PS-N63AE pull stud|Y
01|175445|5|1|billing purposes only - installed on above holder|Y
01|175445|7|1|PS-N63AE pull stud|Y
01|175445|8|1|billing purposes only - installed on above holder|Y
01|175445|10|1|PS-N63AE pull stud|Y
01|175445|11|1|billing purposes only - installed on above holder|Y
01|175445|13|1|PS-N63AE pull stud|Y
01|175445|14|1|billing purposes only - installed on above holder|Y
01|175445|16|1|PS-N63AE pull stud|Y
01|175445|17|1|billing purposes only - installed on above holder|Y
01|175445|19|1|PS-N63AE pull stud|Y
01|175445|20|1|billing purposes only - installed on above holder|Y
01|175445|22|1|PS-N63AE pull stud|Y
01|175445|23|1|billing purposes only - installed on above holder|Y
01|175445|25|1|PS-N63AE pull stud|Y
01|175445|26|1|billing purposes only - installed on above holder|Y
01|175445|28|1|PS-N63AE pull stud|Y
01|175445|29|1|billing purposes only - installed on above holder|Y
01|175471|2|1|Non-refundable Non-cancellable|Y
01|175491|12|1|PART # TCE-95947-XXXXR|Y
01|175491|12|2|Length TBD depending on application|Y
01|175491|13|1|Part # TCE-95951-XXXXR|Y
01|175491|13|2|Length TBD depending on application|Y
01|175492|1|1|Alpha 2/5000i Servo Motor|Y
01|175492|1|2|Part # A06B-2205-B000|Y
01|175501|1|1|NET PRICE|Y
01|175501|4|1|KC-300; 45 DEGREE SMALL ANGLE HEAD|Y
01|175501|4|2|NON-CANCELLABLE; NON-RETURNABLE ONCE ORDER IS PLACED|Y
01|175501|5|1|SINGLE PIECE DESIGN POSITIONING BLOCK|Y
01|175501|6|1|TWO-PIECE DESIGN POSITIONING BLOCK|Y
01|175503|6|1|Riser Plates for TAT-250(40mm) & CNC302 (20mm)|Y
01|175523|1|1|Rotary Table Tailstock and Subplates mounted by|Y
01|175523|1|2|Enduser or Morris South|Y
01|175523|1|3|Workholding responible by Enduser|Y
01|175528|1|1|CNC321TFA SN: 5887|Y
01|175528|1|2|TAR-58121|Y
01|175528|1|3|TABLE NEEDS FULL REBUILD TO FACTORY SPEC|Y
01|175528|19|1|NEW POWER/FEEDBACK HARNESS INSIDE TABLE|Y
01|175528|20|1|PART # CN322R019|Y
01|175530|1|1|TAR-58121 TAT-321 SN: 2175|Y
01|175530|1|2|Support Table needs rebuild - bearings/seals/o-rings|Y
01|175536|2|1|Hand Labor/Change all wire from Cabinet to RT|Y
01|175539|1|1|Mimatic #135811|Y
01|175539|3|1|Pricing reflects an order of 3~4 Flex Heads.|Y
01|175539|8|1|C40FHM-ER16-198IC-65TP CAT40 ER16 Angle Head Flex|Y
01|175539|8|2|IntCoolant 65mm Pitch Tapered Pin 8000rpm 15Nm|Y
01|175539|9|1|C40FHM-ER16-198IC-65TP CAT40 ER16 Angle Head Flex|Y
01|175539|9|2|IntCoolant 65mm Pitch Tapered Pin 8000rpm 15Nm|Y
01|175539|17|1|Discount relects a purchase order of 1~2 heads.|Y
01|175539|18|1|Discount relects a purchase order of 3~4 heads.|Y
01|175557|9|1|NBT30-Q12-65|Y
01|175557|11|1|3MP-C2(T2000Z)|Y
01|175557|22|1|NBT30-FMH27-60-45|Y
01|175557|51|1|NBT30-C25-80|Y
01|175573|1|1|ref. 192965|Y
01|175573|2|1|ref. 192967|Y
01|175573|9|1|LYN part# TBD|Y
01|175573|9|2|Ref. Mimatic# 197603|Y
01|175573|9|3|BMT65 Capto 4 Output Z-Axis 90Degree C/H=72mm|Y
01|175573|9|4|Special item: cannot be cancelled or returned|Y
01|175573|9|5|Customer must review drawing|Y
01|175603|1|1|13700TA-3167-011122|Y
01|175609|3|1|Estimate|Y
01|175619|1|1|CNC321TFA-M with 8+1 RJ SN 5887|Y
01|175619|1|2|special for Aisin TN|Y
01|175619|2|1|TAT-321-240 per SN Table 5887|Y
01|175619|2|2|Special for Aisin TN|Y
01|175619|5|1|AIR freight for CNC321TFA-M|Y
01|175619|6|1|AIR freight for TAT-321|Y
01|175628|1|1|Non standard stock item non cancelable nor returnable|Y
01|175628|1|2|In stock at factory lead 2-3 weeks|Y
01|175628|2|1|Non standard stock item non cancelable nor returnable|Y
01|175628|2|2|In stock at factory lead 2-3 weeks|Y
01|175631|3|1|ADAPTER PLATE FOR MOUNTING ATLAS 16C COLLET CLOSER|Y
01|175631|3|2|NET PRICE; CUSTOM MADE FOR CHUCK & ROTARY|Y
01|175631|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|175648|7|1|NET PRICING|Y
01|175658|10|1|We can bring in the old style holder and offer these|Y
01|175658|10|2|smooth nuts at no charge to maintain wrench consistency|Y
01|175658|11|1|Options to cover the long lead time on the B/O item|Y
01|175658|14|1|works with torque handle above|Y
01|175671|18|1|Retention Knob pricing reflects purchase of matching|Y
01|175671|18|2|Taper holder|Y
01|175677|4|1|Onetime Test Discount Extended - Non-Returnable|Y
01|175690|1|1|Setup for Hydraulic Braking - Ellison supply Hyd Unit|Y
01|175695|3|1|On QF for delv|Y
01|175698|1|1|TAR-58143 TAT-250|Y
01|175721|3|1|Covers range .452-.472 which should work|Y
01|175721|3|2|for 15/32 (.4688) dia cutter size|Y
01|175742|1|1|Nikken Pull Stud --> TBD and quoted separate|Y
01|175742|1|2|Pull studs are installed at factory with the NC5|Y
01|175742|1|3|holder.|Y
01|175742|3|1|Nikken Pull Stud --> TBD and quoted separate|Y
01|175742|3|2|Pull studs are installed at factory with the NC5|Y
01|175742|3|3|holder.|Y
01|175742|5|1|Nikken Pull Stud --> TBD and quoted separate|Y
01|175742|5|2|Pull studs are installed at factory with the NC5|Y
01|175742|5|3|holder.|Y
01|175742|7|1|Nikken Pull Stud --> TBD and quoted separate|Y
01|175742|7|2|Pull studs are installed at factory with the NC5|Y
01|175742|7|3|holder.|Y
01|175742|9|1|Nikken Pull Stud --> TBD and quoted separate|Y
01|175742|9|2|Pull studs are installed at factory with the NC5|Y
01|175742|9|3|holder.|Y
01|175743|1|1|We currently have 5 in stock. Balance 13~14 weeks ARO.|Y
01|175756|1|1|Base Unit - Connectable to Computer|Y
01|175756|5|1|First unit in series with built-in Computer|Y
01|175756|9|1|Same stand is used for both units|Y
01|175756|10|1|Same gauge is used for both units|Y
01|175758|1|1|BT40-ZMAC32-180V|Y
01|175758|1|2|BT40 ZMAC Boring Bar Advanced|Y
01|175764|1|1|This holder will include the DIN modification service|Y
01|175764|1|2|New P/N: C4006-0750-4.00DIN-M will be the final|Y
01|175764|1|3|part number.  Pricing is List less discount +|Y
01|175764|1|4|modification charge. Quoted as NET|Y
01|175768|3|1|Cable Set|Y
01|175768|4|1|**Note: This Support Table does not match Center Height|Y
01|175768|4|2|of the Quoted NCT200.|Y
01|175770|2|1|SY20-120|Y
01|175770|2|2|Centering Holder 20mm for OD/ID Centering|Y
01|175770|5|1|BT40-ZMAC32-195|Y
01|175770|5|2|BT40 ZMAC Boring Bar Advanced|Y
01|175770|6|1|S12-BCBX12.7-95|Y
01|175770|6|2|Straight Shank ZMAC Boring Bar for Deep Hole|Y
01|175770|7|1|S13-BCBX14.5-105|Y
01|175770|7|2|Straight Shank ZMAC Boring Bar for Deep Hole|Y
01|175770|8|1|S15-ZMACX16-120V|Y
01|175770|8|2|Straight Shank ZMAC Boring Bar for Deep Hole|Y
01|175770|9|1|S19-ZMACX20-150V|Y
01|175770|9|2|Straight Shank ZMAC Boring Bar for Deep Hole|Y
01|175787|1|1|RGA# TAR-58146|Y
01|175802|10|1|We can bring in the old style holder and offer these|Y
01|175802|10|2|smooth nuts at no charge to maintain wrench consistency|Y
01|175802|11|1|Options to cover the long lead time on the B/O item|Y
01|175802|14|1|works with torque handle above|Y
01|175818|1|1|part# CAT50U-AF1-30-OH|Y
01|175818|1|2|Back Spot Facing Arbor Main Body|Y
01|175818|2|1|part# BF130-17.4625-34.925-30.95 498C|Y
01|175818|2|2|Arbor for above|Y
01|175818|3|1|part# 9BF130-17.4625-34.925-30.95 498-W|Y
01|175818|3|2|Byte for above (1pc construction)|Y
01|175839|1|1|Discount reflects 1~3 tools.|Y
01|175839|2|1|Discount reflects 4~5 tools.|Y
01|175839|3|1|Discount reflects 6+ tools.|Y
01|175858|19|1|**Stronger Gripping option compared to Hydraulic Chucks|Y
01|175866|1|1|Please order part # CAT40-ER40-3.15BN|Y
01|175868|6|1|**MIN ORDER QTY: 50pcs|Y
01|175871|1|1|This unit includes two free pots of your choice|Y
01|175871|1|2|All Free pots included on line 2|Y
01|175879|1|1|NO DRIVE PINS; 4 IN STOCK|Y
01|175879|2|1|WITH DRIVE PINS; 4 IN STOCK|Y
01|175879|2|2|BALANCEABLE W/ SCREWS|Y
01|175881|1|1|RGA#TAR-58158|Y
01|175881|1|2|5AX-2MT-105-120FA-M SN:8322F|Y
01|175905|1|1|Made of steel|Y
01|175918|1|1|Includes TAT170 and Martin Quote # 7794|Y
01|175918|3|1|Includes 4th axis interface drivescables and install|Y
01|175918|3|2|Placing the trunnion system on the machine by Enduser|Y
01|175924|1|1|Martin Quote # 7789|Y
01|175924|3|1|Includes 4th axis interface drivescables and install|Y
01|175924|3|2|Placing the trunnion system on the machine by Enduser|Y
01|175930|11|1|hold .318|Y
01|175930|27|1|holds .392|Y
01|175933|1|1|HSK100A-MMC8C-117-AT|Y
01|175933|1|2|HSK100 8mm Mini Mini - rear draw  117mm Gauge Length|Y
01|175970|41|1|alt for C4007-0011-4.00|Y
01|175970|41|2|**Shorter gage length of only 2.50|Y
01|175970|43|1|alt for ER20 version C4007-0020-2.50|Y
01|175970|52|1|*Dual Contact will work in standard CAT40 spindle|Y
01|175970|52|2|*alt for C4007-0032-3.13  (same GL)|Y
01|175970|53|1|part of wrench set|Y
01|175970|54|1|part of wrench set|Y
01|175970|56|1|alt for C4007-0032-3.13|Y
01|175970|56|2|**shorter GL of 2.76|Y
01|175974|1|1|NBT50-70RMF-413MH|Y
01|175974|1|2|SPECIAL TOOL; NON-CANCELABLE/NON-RETURNABLE|Y
01|175974|2|1|NBT50-80RMF-430MH|Y
01|175974|2|2|SPECIAL TOOL; NON-CANCELABLE/NON-RETURNABLE|Y
01|175974|3|1|NBT50-90RMF-378MH|Y
01|175974|3|2|SPECIAL TOOL; NON-CANCELABLE/NON-RETURNABLE|Y
01|175974|4|1|NBT50-100RMF-428MH|Y
01|175974|4|2|SPECIAL TOOL; NON-CANCELABLE/NON-RETURNABLE|Y
01|175974|5|1|NBT50-110RMF-352MH|Y
01|175974|5|2|SPECIAL TOOL; NON-CANCELABLE/NON-RETURNABLE|Y
01|175974|6|1|NBT50-RMF120-357MH|Y
01|175974|6|2|SPECIAL TOOL; NON-CANCELABLE/NON-RETURNABLE|Y
01|175994|1|1|CS-027-090-007 to be etched on tooling.|Y
01|175994|2|1|NET price quoted for chip and installation.|Y
01|176020|1|1|Discount reflects onetime non-returnable test promo|Y
01|176020|1|2|Vaild for x1 SK6 holder|Y
01|176020|2|1|Discount reflects onetime non-returnable test promo|Y
01|176020|2|2|Vaild for x1 SK6 holder|Y
01|176020|3|1|Optional|Y
01|176020|8|1|Discount reflects onetime non-returnable test promo|Y
01|176020|8|2|Vaild for x1 SK10 holder|Y
01|176020|9|1|Discount reflects onetime non-returnable test promo|Y
01|176020|9|2|Vaild for x1 SK10 holder|Y
01|176020|10|1|Discount reflects onetime non-returnable test promo|Y
01|176020|11|1|Discount reflects onetime non-returnable test promo|Y
01|176023|3|1|part# T50U-C32-200S|Y
01|176023|3|2|NMTB50 32mm Milling Chuck with 200mm gage length|Y
01|176023|5|1|part# T50U-C32-250S|Y
01|176023|5|2|NMTB50 32mm Milling Chuck with 250mm gage length|Y
01|176025|1|1|NCAT50-C3/4-205U|Y
01|176028|1|1|Tooling Certificate 13687-3031-081221|Y
01|176032|1|1|BT40-ZMAC32-180V|Y
01|176032|1|2|BT40 ZMAC Boring Bar Advanced|Y
01|176042|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|176042|2|2|INCLUDED AT NO COST TO MORRIS SOUTH|Y
01|176043|5|1|To thread draw screw at additional charge|Y
01|176043|5|2|NET price|Y
01|176071|1|1|C6-SK6-60P|Y
01|176071|1|2|Polygon C6 SK6 Slim Chuck High Speed 30000rpm G2.5|Y
01|176071|8|1|C6-SK16-120P|Y
01|176071|8|2|Polygon C6 SK16 Slim Chuck High Speed 25000rpm G2.5|Y
01|176078|6|1|CKFN12-3C coolant cap|Y
01|176078|8|1|CKFN12-4C coolant cap|Y
01|176078|12|1|CKFN12-8C coolant cap|Y
01|176078|22|1|CKFN16-3C coolant disc|Y
01|176078|24|1|CKFN16-4C coolant disc|Y
01|176078|26|1|CKFN16-6C coolant disc|Y
01|176078|28|1|CKFN16-8c coolant disc|Y
01|176078|32|1|CKFN16-12C coolant disc|Y
01|176079|5|1|NO AMP IN MACHINE - L/N TO SUPPLY AND DO FULL INSTALL|Y
01|176079|5|2|MORI CMX1100V|Y
01|176079|5|3|** IF MACHINE HAS AMP PRICE WILL BE REDUCED **|Y
01|176108|1|1|CAT40-SK6F-150U-IDU-M|Y
01|176108|1|2|CAT40 SK6 Slim Chuck DIN 20000rpm G2.5|Y
01|176109|1|1|TCD-A3334/1 is the drawing# for this item|Y
01|176142|5|1|Internacl cables pwd fdb|Y
01|176144|1|1|Includes custom short motor cover to clear the machine|Y
01|176144|1|2|column.|Y
01|176144|2|1|Installation includes: New interface cables external|Y
01|176144|2|2|cables parameter changes service time and travel|Y
01|176151|2|1|RPT treatment for face plate|Y
01|176152|3|1|Installation on sie include Fanuc drive|Y
01|176152|3|2|Cable's and bulkhead|Y
01|176157|1|1|Installation includes drive unit short barfiber optic|Y
01|176157|1|2|cablecommunications cable external cables plumbing|Y
01|176157|1|3|from junction box to table. Parameter changes service|Y
01|176157|1|4|time and travel.|Y
01|176165|4|1|Part # SKJ25-7|Y
01|176177|1|1|One time special price for show table.|Y
01|176182|1|1|Req. INS/*LastPurch 2019|Y
01|176185|1|1|Pull Stud (PS-N63AE) installed on holder|Y
01|176185|2|1|Installed on NC5 holder at factory|Y
01|176226|1|1|ships 1 to 2 weeks A.R.O. includes cables|Y
01|176226|2|1|Ships 4 weeks A.R.O. - Includes Cables|Y
01|176228|1|1|5AX-130YA SN: 5954|Y
01|176228|1|2|TABLE CAME IN FOR NOT HOLDING TILT AXIS|Y
01|176228|1|3|TABLE HAD SMALL CONTACT/CRASH ALIGNMENT PIN BENT|Y
01|176228|1|4|BRAKE SEALS REPLACED|Y
01|176236|1|1|Will send in a delivery request - not in stock|Y
01|176236|2|1|In Stock|Y
01|176250|11|1|SP34-34-60 - SPACER|Y
01|176250|16|1|SP26-26-60 SPACER|Y
01|176250|21|1|SP20-20-60 SPACER|Y
01|176250|26|1|SP16-16-45 SPACER|Y
01|176252|2|1|Dimensions to be provided to our engineer|Y
01|176254|1|1|S15-ZMACX16-120V|Y
01|176254|2|1|3MP-C4(T1500Z) 10pcs|Y
01|176254|3|1|3MP-B4(KBN510) 1pc|Y
01|176254|4|1|SK20-15A|Y
01|176277|1|1|KM63 TO CAPTO C6|Y
01|176277|1|2|300582|Y
01|176282|1|1|Please Note: Minimum order quantity is 5 holders.|Y
01|176282|1|2|This item is non standard stock once a PO has been|Y
01|176282|1|3|placed it can not be cancelled or returned.|Y
01|176290|1|1|Special pricing for a USED unit * ALL SALES FINAL|Y
01|176290|1|2|NO RETURNS OR EXCHANGES*|Y
01|176290|1|3|* 1 Year warranty on the units *|Y
01|176294|6|1|CKFN12-3C coolant cap|Y
01|176294|8|1|CKFN12-4C coolant cap|Y
01|176294|12|1|CKFN12-8C coolant cap|Y
01|176294|22|1|CKFN16-3C coolant disc|Y
01|176294|24|1|CKFN16-4C coolant disc|Y
01|176294|26|1|CKFN16-6C coolant disc|Y
01|176294|28|1|CKFN16-8c coolant disc|Y
01|176294|32|1|CKFN16-12C coolant disc|Y
01|176303|1|1|Replaces CN103R007|Y
01|176306|19|1|*mechanically steel sealed|Y
01|176306|25|1|Switch coolant nut for any holders utilizing|Y
01|176306|25|2|SK16-3mm SK16-4mm collets/disc|Y
01|176313|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|176315|1|1|INS Req'd:Give 2p to SVC|Y
01|176315|2|1|INS Req'd:Give 2p to SVC|Y
01|176315|3|1|INS Req'd:Give 2p to SVC|Y
01|176315|4|1|INS Req'd:Give 2p to SVC|Y
01|176315|5|1|INS Req'd:Give 2p to SVC|Y
01|176315|6|1|INS Req'd:Give 2p to SVC|Y
01|176324|1|1|INS Req'd:Give 2p to SVC|N
01|176324|2|1|INS Req'd:Give 2p to SVC|N
01|176324|3|1|INS Req'd:Give 2p to SVC|N
01|176350|1|1|TAR-58162|Y
01|176350|1|2|CNC100-4W-120FA SN:9036|Y
01|176350|36|1|Brake Ball Bearings 5/16' (7.94)|Y
01|176358|1|1|RGA#TOR-58204/|Y
01|176358|1|2|Repair of PF-2|Y
01|176358|3|1|Calibration service included.|Y
01|176363|1|1|HSK100A-MMC8C-117-AT|Y
01|176363|1|2|HSK100 8mm Mini Mini - rear draw  117mm Gauge Length|Y
01|176363|1|3|This item is considered special once ordered cannot|Y
01|176363|1|4|cancelled or returned|Y
01|176363|2|1|This item is considered special once ordered cannot|Y
01|176363|2|2|be cancelled or returned.|Y
01|176363|3|1|HSK100A-MMC12C-120-AT|Y
01|176363|3|2|HSK100 12mm Mini Mini - rear draw  120mm Gauge Length|Y
01|176363|3|3|This item is considered special once ordered cannot|Y
01|176363|3|4|be cancelled or returned|Y
01|176363|4|1|HSK100A-MMC12C-145-AT|Y
01|176363|4|2|HSK100 12mm Mini Mini - rear draw  145mm Gauge Length|Y
01|176363|4|3|This item is considered special once ordered cannot|Y
01|176363|4|4|be cancelled or returned.|Y
01|176363|12|1|This size is considered special once ordered cannot|Y
01|176363|12|2|be cancelled or returned.|Y
01|176384|1|1|Comes with CT200R030 Faceplate with T-Slots|Y
01|176387|1|1|3 Week Delivery After Receipt Of PO|Y
01|176401|44|1|NEW INTERNAL CABLES POWER & FEEDBACK ROTARY/TILT|Y
01|176408|2|1|Include Hand Labor and Interface|Y
01|176413|1|1|Quoted as NET pricingnon-returnable non-cancelable|Y
01|176416|2|1|**NET price|Y
01|176431|1|1|Please order part #C4006-1500-4.50DIN-M|Y
01|176445|3|1|This item is considered special once ordered cannot|Y
01|176445|3|2|be returned.|Y
01|176459|10|1|We currently have 1ea in stockif miss B/O for 2 weeks|Y
01|176479|5|1|AIR LINE AND NEW SPRING|Y
01|176481|1|1|Configured to Replace table SN: 3093H|Y
01|176481|2|1|OPTIONAL - Replacement Cables from Table to Machine|Y
01|176481|2|2|2 Cables per axis / 2 Axis Table = 2 Cable Sets|Y
01|176481|3|1|OPTIONAL - Trade in credit for leaving old table at LN.|Y
01|176481|3|2|Customer can also choose no trade in and receive old|Y
01|176481|3|3|table back in disassembled condition.|Y
01|176481|3|4|If trade in is chosen then customer does not get table|Y
01|176481|3|5|back.|Y
01|176484|1|1|Includes Haas Motor and Cables.|Y
01|176484|5|1|Custom Adapter Plate for Hydraulic Royal Collet Chuck|Y
01|176489|1|1|CAT50; AGH U-TOOL; ER25; 3PIN SUPPORT; L=260mm;|Y
01|176489|1|2|1:1 GEAR; Max 6000RPM; Max 30Nm;|Y
01|176489|1|3|INT COOLANT THRU SPINDLE; EXT COOLANT THRU PIPE|Y
01|176489|1|4|Mim 140066 PO#10|Y
01|176496|2|1|Please Note: Once a purchase order is placed it|Y
01|176496|2|2|can not be cancelled or returned.|Y
01|176506|5|1|Hoses and Fitting|Y
01|176512|1|1|CAT40 - C5 Adapter|Y
01|176522|1|1|BT30-DJ8-84AN DJ Boring Bar>> Includes BT30-Q26-40|Y
01|176522|1|2|Q26-DJ8-44AN and J16|Y
01|176522|3|1|CAT40-DJ8-94AN|Y
01|176532|1|1|This item is considered special once ordered it|Y
01|176532|1|2|cannot be cancelled or returned.|Y
01|176541|8|1|NMTB50-RAC130-185|Y
01|176541|9|1|NMTB50-RAC180-185|Y
01|176542|1|1|P/N: TBD  CAT50; AGH; 3 PIN SUPPORTS; ER16; L=411.35mm;|Y
01|176542|1|2|L1=260.35mm; 1:1 Gear; MAX 12Nm; MAX 6500RPM;|Y
01|176542|1|3|Ref Drwg#00046817  Mim: 140066 PO#10|Y
01|176542|3|1|P/N: TBD  STANDARD STOP BLOCK A=80mm|Y
01|176542|3|2|HALF FINISHED 2 FLAT|Y
01|176563|1|1|1ea stock.ETA on next batch is early June|Y
01|176566|3|1|STOCK ALTERNATIVE TO ABOVE|Y
01|176566|7|1|STOCK ALTERNATIVE TO ABOVE|Y
01|176591|1|1|1st Batch|Y
01|176591|2|1|1st Batch/Install E20-NUT & ER20-SCREW(C)|Y
01|176591|3|1|1st Batch|Y
01|176591|4|1|1st Batch|Y
01|176591|5|1|1st Batch|Y
01|176591|6|1|1st Batch|Y
01|176591|7|1|1st Batch|Y
01|176591|8|1|Req. INS/Install E20-NUT & ER20-SCREW(C)|Y
01|176591|9|1|Req. INS/Repeat Pls. check holders have NUT/SCREW|Y
01|176591|10|1|1st Batch/904028 Install E16-NUT-G & ER16-SCREW(C)|Y
01|176591|11|1|1st Batch/SAB STD item Install E40-NUT&ER40-SCREW(C)|Y
01|176591|12|1|Req. INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|176591|13|1|1st Batch/Install E32-NUT-G & ER32-SCREW(C)|Y
01|176603|4|1|Rotary table riser to bring center height to 230MM|Y
01|176603|5|1|Includes: Drive unit short bar fiber optic cable|Y
01|176603|5|2|communications cable bulkhead cables external cables|Y
01|176603|5|3|parameter changes service time and travel.|Y
01|176603|5|4|Installation should take two days.|Y
01|176603|5|5|This price is for two installation in one trip.|Y
01|176603|6|1|This price is for one installation per trip.|Y
01|176619|1|1|EXTRA 4% Disc per Quantity|Y
01|176619|6|1|ZipCode 11921 Hayter RD Laredo Texas|Y
01|176631|1|1|RGA#LVR-58214/|Y
01|176631|1|2|Repair of MNL12-ER32Z-MS s/n:A2255 (Alps#T32216)|Y
01|176631|2|1|Bearings o-rings collet nuts and spindles to be|Y
01|176631|2|2|replaced. If the spindles can be reused the cost will|Y
01|176631|2|3|be $1805.20|Y
01|176644|6|1|PRICE AND DELIVERY ARE PENDING; DO NOT QUOTE AT $0|Y
01|176644|6|2|SPECIAL; NON-RETURNABLE & NON-CANCELLABLE|Y
01|176644|7|1|PRICE AND DELIVERY ARE PENDING; DO NOT QUOTE AT $0|Y
01|176644|7|2|SPECIAL; NON-RETURNABLE & NON-CANCELLABLE|Y
01|176644|8|1|PRICE AND DELIVERY ARE PENDING; DO NOT QUOTE $0|Y
01|176644|8|2|SPECIAL; NON-RETURNABLE & NON-CANCELLABLE|Y
01|176644|21|1|ALL AVAILABLE EXCEPT 8MM WHICH IS DUE MID JULY|Y
01|176644|22|1|ALL AVAILABLE EXCEPT 3/16 WHICH IS DUE MID JUNE|Y
01|176645|2|1|This holder would come with an ER32 bearing nut|Y
01|176645|2|2|Please order CAT40-ER32-2.76BN|Y
01|176645|3|1|This holder would come with an ER32 bearing nut|Y
01|176645|3|2|Please order part # CAT40-ER32-4.00BN|Y
01|176656|6|1|Alternate for SK10-5/32A|Y
01|176698|9|1|Replaces NC5011-0750-4.00|Y
01|176698|10|1|Pin Wrench for cap install|Y
01|176698|11|1|For mill chuck|Y
01|176701|2|1|CAT40 Adjustable Flex Head - ER16 Output - Weight 7kg|Y
01|176701|2|2|Max RPM is 10000 RPM Torque is 12Nm|Y
01|176713|1|1|TAR-58149|Y
01|176713|1|2|5AX-2002FA-M|Y
01|176713|16|1|AX203R043 - Price Pending|Y
01|176713|23|1|Replaces CRBH13025AUUE03|Y
01|176713|37|1|Replaces 32010XU|Y
01|176713|38|1|Replaces AC628512|Y
01|176713|50|1|Tilt wire harness|Y
01|176713|51|1|Rotary wire harness|Y
01|176719|1|1|s/n.13941  w/o Direct mount Cable and Motor|Y
01|176719|3|1|TCD-C4549|Y
01|176719|3|2|10+1p Rortaty Joint Built-In for CNC260FA S/N 13941|Y
01|176721|1|1|Req.INS/for stock|Y
01|176744|6|1|Option for SK10-5/32|Y
01|176752|1|1|s/n.13941  w/o Direct mount Cable and Motor|Y
01|176752|3|1|TCD-C4549|Y
01|176752|3|2|10+1p Rortaty Joint Built-In for CNC260FA S/N 13941|Y
01|176766|6|1|Alternative to SK10-5/32A|Y
01|176785|4|1|Special AFI Discount for Test Tool|Y
01|176785|5|1|Special AFI Discount for Test Tool|Y
01|176800|1|1|Convert to SA-BR 1 Table only|Y
01|176800|1|2|Table / Cables / B Axis Cable /|Y
01|176800|1|3|Center Divider / Sheet Metal / Gear for motor|Y
01|176814|2|1|Installation includes: Bulkhead cables external cables|Y
01|176814|2|2|parameter changes service time and travel.|Y
01|176814|2|3|DDR drive must be present|Y
01|176814|4|1|Installation includes: Dual axis drive short bar|Y
01|176814|4|2|fiber optic cables communications cables bulkhead|Y
01|176814|4|3|cables external cables parameter changes service|Y
01|176814|4|4|time and travel.|Y
01|176814|4|5|20% discount for trade in for the existing DDR drive|Y
01|176835|6|1|Installation includes travel mounting table hooking|Y
01|176835|6|2|up cables setting parameters and zeros.|Y
01|176837|7|1|NET eano additional discount.Customer to provide|Y
01|176837|7|2|dimensional info|Y
01|176853|5|1|Hoses and Fittings|Y
01|176855|1|1|TAR-58093 5AX-2002FA-M SN: 2050|Y
01|176855|1|2|TABLE NEEDS FULL REBUILD|Y
01|176873|4|1|Also 9/64|Y
01|176873|5|1|Also 11/64|Y
01|176873|6|1|Also 15/64|Y
01|176873|11|1|25/64|Y
01|176900|1|1|CAT40-SF5-100|Y
01|176900|1|2|CAT40 5mm Shrink Fit Holder w/ 100mm gage length|Y
01|176913|3|1|Fanuc Interface and Hand Labor on site|Y
01|176942|9|1|1000 DATAMATRIX BARCODE LABELS|Y
01|176943|13|1|Takes up aprox. 3.50 of height.|Y
01|176950|1|1|C6-SK6-60P|Y
01|176950|1|2|Polygon C6 SK6 Slim Chuck High Speed 30000rpm G2.5|Y
01|176950|8|1|C6-SK16-120P|Y
01|176950|8|2|Polygon C6 SK16 Slim Chuck High Speed 25000rpm G2.5|Y
01|176951|3|1|Closest option to CAT40-SX25M-0472|Y
01|176951|4|1|Closest option to 6.00|Y
01|176951|6|1|Covers 5/32 range|Y
01|176951|8|1|Covers 7/32 range|Y
01|176951|9|1|Covers 9/32 range|Y
01|176951|10|1|Covers 11/32 range|Y
01|176951|12|1|Covers 13/32 range|Y
01|176951|13|1|Covers 15/32 range|Y
01|176951|15|1|Covers 13/32 7/16 15/32|Y
01|176951|16|1|Covers 1/2 and 9/16|Y
01|176951|17|1|Covers 19/32|Y
01|176951|19|1|Covers 21/32|Y
01|176951|20|1|Covers 11/16|Y
01|176951|21|1|Covers 23/32|Y
01|176951|23|1|Covers 25/32|Y
01|176951|24|1|Covers 13/16|Y
01|176951|25|1|Covers 27/32|Y
01|176955|1|1|C6-SK6-60P|Y
01|176955|1|2|Polygon C6 SK6 Slim Chuck High Speed 30000rpm G2.5|Y
01|176955|8|1|C6-SK16-120P|Y
01|176955|8|2|Polygon C6 SK16 Slim Chuck High Speed 25000rpm G2.5|Y
01|176963|1|1|Req. INS/For stock|Y
01|176966|1|1|TAR-58093 5AX-2002FA-M SN: 2050|Y
01|176966|1|2|TABLE NEEDS FULL REBUILD|Y
01|176967|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXES|Y
01|176978|1|1|KS-CN262L-FA6/2|Y
01|176994|8|1|Installation & Training $1800.00 - No Charge|Y
01|177002|2|1|Includes: Drive unit short bar fiber optic cable|Y
01|177002|2|2|communications cable bulkhead cables external cables|Y
01|177002|2|3|parameter changes service time and travel.|Y
01|177011|5|1|quoted as an in stock option to line 3|Y
01|177011|12|1|quoted as an in stock option to line 9|Y
01|177029|1|1|5% Adicional per package|Y
01|177031|2|1|4th&5th axis Interface power and feedback cables|Y
01|177031|2|2|from Nikken Table to Machine Bulkhead installation|Y
01|177031|2|3|travel and labor. Ellison will need to have parameters|Y
01|177031|2|4|or options turned on for the 4th&5th axis option|Y
01|177038|3|1|Tight Tqr: 8-44 Ft-Lbs 10-60Nm|Y
01|177057|4|1|MISC ITEMS IF NEEDED|Y
01|177063|5|1|Remote Training - $150.00/Hour with a 4 Hour Minimum.|Y
01|177067|2|1|Please order Part # SP34-34-60 - Spacer for above.|Y
01|177081|2|1|Cannot be cancelled or returned|Y
01|177096|6|1|**replaces TQW-200**|Y
01|177097|8|1|HAAS GR712|Y
01|177108|1|1|HOT DEALS NET PRICE; LIST PRICE NORMALLY $788|Y
01|177108|1|2|24 IN STOCK|Y
01|177108|3|1|SK25 WRENCH|Y
01|177108|5|1|HOT DEALS NET PRICE; LIST PRICE NORMALLY $765|Y
01|177108|5|2|15 IN STOCK|Y
01|177108|6|1|HOT DEALS NET PRICE; LIST PRICE NORMALLY $811|Y
01|177108|6|2|6 IN STOCK|Y
01|177108|8|1|HOT DEALS NET PRICE; LIST PRICE NORMALLY $855|Y
01|177108|8|2|21 IN STOCK|Y
01|177138|1|1|Onetime discount extension from standard 30%|Y
01|177146|2|1|Replaces VMK8-1/8J|Y
01|177146|3|1|$10 NET each  to etch customer part # onto collet.|Y
01|177149|4|1|INCLUDES (2) EIGHT HOUR DAYS FOR INST. & TRAINING|Y
01|177153|2|1|NET ea priceno additional discount.Customer will need|Y
01|177153|2|2|to supply dimensional info for us to  create a block|Y
01|177158|8|1|ALT for: NCAT40-MMC8C-120U-IDU|Y
01|177158|9|1|ALT for: NCAT40-MMC8C-120U-IDU|Y
01|177158|10|1|ALT for: VMK8-1/8|Y
01|177159|2|1|spindle wrench|Y
01|177159|3|1|nut wrench|Y
01|177166|1|1|part# TBD|Y
01|177166|1|2|CAT50 Shell Mill 22mm OD 10mm key ways w/|Y
01|177166|1|3|350mm projection|Y
01|177166|1|4|Using super radius mill ASR type: ASR5063M-4|Y
01|177166|1|5|*3-4pc|Y
01|177166|2|1|*5pc+|Y
01|177181|2|1|Installation inlcudes: Dual axis drive unit short bar|Y
01|177181|2|2|fiber optic cables communications cables bulkhead|Y
01|177181|2|3|cables external cables parameter changes service|Y
01|177181|2|4|time and travel.|Y
01|177181|2|5|Installation to take two days.|Y
01|177185|1|1|RGA#LVR-58240/|Y
01|177185|1|2|Repair of OKU-L370-X s/n:AL0077 (Alps#OK101-14000)|Y
01|177185|2|1|Bearings o-rings collet nut and spindle to be|Y
01|177185|2|2|replaced. If the spindle can be reused the cost will|Y
01|177185|2|3|be $1250.00|Y
01|177208|9|1|If ordered by 4/26 this item will ship on 5/6|Y
01|177208|10|1|If ordered by 4/26 this item will ship 5/6|Y
01|177208|11|1|If ordered by 4/26 this item will ship 5/6|Y
01|177208|13|1|SKJ25-4C SK20 4mm coolant thru disc|Y
01|177208|13|2|Special item not cancelable nor returnable|Y
01|177233|1|1|100mm Gage Length|Y
01|177238|2|1|NBT40-SK13C-90|Y
01|177238|2|2|NBT40 Dual Contact SK13 Slim Chuck Coolant 15000rpm|Y
01|177238|3|1|NBT40-SK16C-90|Y
01|177238|3|2|NBT40 Dual Contact SK16 Slim Chuck Coolant 15000rpm|Y
01|177238|4|1|NBT40-SK20C-90|Y
01|177238|4|2|NBT40 Dual Contact SK20 Slim Chuck Coolant 15000rpm|Y
01|177253|3|1|part# CAT50-SF1125-4.00|Y
01|177253|3|2|CAT50 1.1/8 Shrink Fit Holder w/ 4 Gage Length|Y
01|177253|7|1|part# CAT50-SF1125-4.00CP|Y
01|177253|7|2|CAT50 1.1/8 Shrink Fit Holder w/ 4 Gage Length|Y
01|177253|7|3|Pluggable Coolant Ports|Y
01|177253|11|1|part# CAT50-SF1125-6.00|Y
01|177253|11|2|CAT50 1.1/8 Shrink Fit Holder w/ 6 Gage Length|Y
01|177253|15|1|part# CAT50-SF1125-6.00CP|Y
01|177253|15|2|CAT50 1.1/8 Shrink Fit Holder w/ 6 Gage Length|Y
01|177253|15|3|Pluggable Coolant Ports|Y
01|177277|8|1|ALT for: NCAT40-MMC8C-120U-IDU|Y
01|177277|9|1|ALT for: NCAT40-MMC8C-120U-IDU|Y
01|177277|10|1|ALT for: VMK8-1/8|Y
01|177290|2|1|No coolant ports|Y
01|177308|2|1|NET ea chargeno additional discount.|Y
01|177308|2|2|Customer to provide dimensions for proper block to be|Y
01|177308|2|3|made|Y
01|177316|3|1|Unrepairable CAT40U-NX5-153|Y
01|177319|2|1|new part# BT50-MMC12C-135-AA|Y
01|177320|2|1|new part# BT50-MMC12C-135-AA|Y
01|177324|1|1|STH25-SK16-130-J|Y
01|177324|1|2|Straight Shank Extension OD25mm SK16 Slim Chuck|Y
01|177324|1|3|with Coolant Nut|Y
01|177324|8|1|SKL-16-TLS|Y
01|177324|8|2|Torque Wrench SK16|Y
01|177325|1|1|Onetime Test discount extended - nonreturnable|Y
01|177325|2|1|Onetime Test discount extended - nonreturnable|Y
01|177325|3|1|Onetime Test discount extended - nonreturnable|Y
01|177338|1|1|part# MZQT5-ER32X-OFF-HS-ICE|Y
01|177338|1|2|Ref. Drawing# 193971|Y
01|177338|1|3|Mazak Live ER32 X-AXIS Straight V-type Offset|Y
01|177338|1|4|ICE (Int/Extcoolant 7MP)|Y
01|177338|1|5|High Speed Gear Ratio 1:2|Y
01|177338|3|1|part# TBD|Y
01|177338|3|2|Ref. Drawing# 191449|Y
01|177338|3|3|Mazak Live ER32 Z-AXIS 90degree H-type|Y
01|177338|3|4|ICE (Int/Extcoolant 7MP)|Y
01|177338|3|5|High Speed Gear Ratio 1:2|Y
01|177356|2|1|new part# BT50-MMC12C-135-AA|Y
01|177360|1|1|RGA#TOR-58266/|Y
01|177360|1|2|Repair of PRE-PART-05PAN s/n:7139|Y
01|177364|1|1|Req. INS/Install E25-NUT & ER25-SCREW(C)|Y
01|177364|2|1|1st Batch/Install E25-NUT & ER25-SCREW(C)|Y
01|177364|3|1|Req. INS/Repeat Pls. check holders have NUT/SCREW|Y
01|177364|4|1|Req. INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|177371|1|1|This unit comes with a mounting bracket and toggle|Y
01|177371|1|2|switch|Y
01|177417|1|1|Dust Proofer(#12)|Y
01|177417|2|1|Screw(#21)|Y
01|177417|3|1|Pilot Bushing(#2)|Y
01|177417|4|1|Cap Screw(#15)|Y
01|177419|1|1|Offset to return of 1ea NC4001-1250-2.00CP and|Y
01|177419|1|2|1ea NC4001-1250-4.00CP on RGA58299|Y
01|177423|1|1|Installation includes: Dual axis drive unit short bar|Y
01|177423|1|2|fiber optic cables communications cables bulkhead|Y
01|177423|1|3|cables external cables parameter changes service|Y
01|177423|1|4|time and travel.|Y
01|177423|1|5|Installation to take two days.|Y
01|177426|2|1|This item is a non standard stock item and is|Y
01|177426|2|2|considered special. Once ordered it cannot be cancelled|Y
01|177426|2|3|or returned|Y
01|177428|7|1|standard handle|Y
01|177428|8|1|Adjustable torque wrench handle|Y
01|177431|8|1|THIS ITEM IS NOW CONSIDERED SPECIAL.  Once an order has|Y
01|177431|8|2|been placed it may not be cancelled or returned.|Y
01|177431|8|3|Minumum Order Quantity applies - Must order 10 pieces|Y
01|177446|2|1|Installation includes: Dual axis drive unit short bar|Y
01|177446|2|2|fiber optic cables communications cables bulkhead|Y
01|177446|2|3|cables parameter changes service time and travel.|Y
01|177446|2|4|Installation to take two days.|Y
01|177452|1|1|RGA#LVR-58094/|Y
01|177452|1|2|Repair of MZMP46-ER32Z-ICE S/N: 7467616|Y
01|177452|1|3|(Mimatic#124854)|Y
01|177452|2|1|Bearings Seals and O-Rings to be replaced. Recondition|Y
01|177452|2|2|1 Input & 1 Output Spindle.|Y
01|177458|1|1|Includes external cable set|Y
01|177458|2|1|Includes external cable set|Y
01|177464|16|1|COOLANT TUBES FOR (5) HSK63A HOLDERS|Y
01|177464|19|1|WRENCH FOR HSK63A-SK16-80|Y
01|177464|20|1|WRENCH FOR (2) HSK63A-SK10C-105|Y
01|177464|21|1|WRENCH FOR (1) HSK63A-MMC8C-107-D|Y
01|177464|22|1|WRENCH FOR HSK63A COOLANT TUBES|Y
01|177484|4|1|Only avail in a 1.12 shank|Y
01|177485|1|1|BT45-C1.1/4-85|Y
01|177485|1|2|pricing per piece for Qty 1 to 9|Y
01|177485|3|1|BT45-C1.1/4-85|Y
01|177485|3|2|Pricing per piece for Qty 10 or more|Y
01|177523|1|1|RGA#TAR-58241|Y
01|177523|1|2|CNC300FA  SN#1287|Y
01|177529|2|1|External cable set|Y
01|177529|4|1|Includes: Big Bore scale with +/-2 mounting kit for|Y
01|177529|4|2|scale and cable.|Y
01|177530|5|1|H63A-SF4-80CP|Y
01|177530|5|2|HSK63A 4mm Shrink Fit w/ 80mm gage length|Y
01|177530|5|3|Pluggable coolant ports|Y
01|177530|5|4|**delivery is from receipt of PO and final approval|Y
01|177530|5|5|drawing.|Y
01|177530|5|6|**This is a special. Once a PO has been issued it|Y
01|177530|5|7|cannot be cancelled or returned.|Y
01|177533|1|1|Part # T40U-NX5-117 >>NMTB40 Spindle Speeder / SK10|Y
01|177533|1|2|15000 RPM MAX/ Weight 4.6kg|Y
01|177533|1|3|Warranty is 1 year against Mfg defects and workmanship.|Y
01|177539|1|1|Mimatic part # 125107|Y
01|177539|1|2|Please order Lyndex Nikken Part# MZQT47-SB10X-GH132|Y
01|177540|2|1|Alt for Bearing Nut Holder|Y
01|177541|2|1|EXTERNAL POWER CABLE SET|Y
01|177541|2|2|EXTERNAL FEEDBACK CABLE SET|Y
01|177541|6|1|PNEUMATIC TS FOR USED WITH 5AX-201FA-M|Y
01|177541|6|2|WILL NEED 2 M COMMAND PORTS 1 FOR CONFIRMATION|Y
01|177541|6|3|1 FOR ACTIVATION.|Y
01|177541|6|4|SOLENOID INCLUDED AIR LINES AND CONNECTIONS ARE NOT|Y
01|177543|1|1|$6000 ADD ON FOR 4000# TOWER CAPACITY|Y
01|177563|2|1|Customer will need to supply dimensions if we are to|Y
01|177563|2|2|make the block|Y
01|177563|2|3|NET ea price with no additional discount|Y
01|177563|5|1|Like C50RAM-ER40-215IC-110TP but with internal coolant|Y
01|177563|5|2|*special not cancelable not returnable|Y
01|177563|6|1|NET ea no additional discount|Y
01|177588|1|1|Special item not cancelable nor returnable once the|Y
01|177588|1|2|order is placed. Price is NET ea with no additional|Y
01|177588|1|3|discount. An approval drawing must be signed by cust.|Y
01|177588|1|4|New part # TBA-HSK63 AGH ER32 STRT OFFSET L=187.5mm|Y
01|177588|1|5|1:1 Gear Max 25Nm; 6500 RPM|Y
01|177588|2|1|NET ea price no additional discount|Y
01|177592|2|1|Cables are standard verify cables.|Y
01|177592|2|2|The current cables are yellow type|Y
01|177592|4|1|Installation includes: Mounting new table parameter|Y
01|177592|4|2|adjustment grid shift backlash compensation.|Y
01|177597|1|1|Cables included|Y
01|177597|2|1|Includes: Nikken indexer with AA21 control box pendant|Y
01|177597|2|2|external cables power cable for control & M-code cable|Y
01|177598|1|1|QUOTE FOR TRADE IN FOR NEW MECHANICAL CASTING PORTION|Y
01|177598|2|1|RGA#TAR-58282|Y
01|177598|2|2|CNCZ180|Y
01|177617|1|1|5AX-130BAYA-BR SN: 5265|Y
01|177617|1|2|TAR-58189|Y
01|177620|1|1|Without motor|Y
01|177621|13|1|ETA: approx 6ea 2 weeks ARO balance approx 5 wks ARO|Y
01|177641|4|1|P/N 174264 - Static Tool - Twin 1.50 Boring Bar Holder|Y
01|177641|5|1|P/N 169787 - Static Tool - Twin 3/4 Turning Holder|Y
01|177657|9|1|This item is considered special once ordered cannot be|Y
01|177657|9|2|cancelled or returned.|Y
01|177657|10|1|This item is considered special once ordered cannot be|Y
01|177657|10|2|cancelled or returned|Y
01|177657|15|1|This item is considered special once ordered cannot be|Y
01|177657|15|2|cancelled or returned.|Y
01|177657|16|1|This item is considered special once ordered cannot be|Y
01|177657|16|2|cancelled or returned.|Y
01|177664|3|1|Installation includes: Dual axis drive short bar|Y
01|177664|3|2|fiber optic cables communications cables bulkhead|Y
01|177664|3|3|cables external cables parameter changes service|Y
01|177664|3|4|time and travel.|Y
01|177664|3|5|Installation to take two days.|Y
01|177667|1|1|1st Batch|Y
01|177678|1|1|Fee for inspecting 4 units of 5AX-130.|Y
01|177678|3|1|Fee for inspecting 12 units of 5AX-130|Y
01|177680|3|1|HAND Labor and interface components|Y
01|177681|2|1|NOTE: Standard nut holders are in stock. To modify to|Y
01|177681|2|2|hi-speed requires the hi-speed nut.  This is 1wk to mfg|Y
01|177681|2|3|plus 1-2wks shipping.|Y
01|177698|2|1|Installation includes: Cable connection mounting table|Y
01|177698|2|2|parameter setting service time and travel.|Y
01|177703|1|1|Sumitomo Part#:SLP7507C|Y
01|177703|3|1|Sumitomo Part#:CT50C|Y
01|177703|4|1|Sumitomo Part#:ER32472|Y
01|177703|5|1|Sumitomo part#:SLP1250032|Y
01|177703|6|1|Sumitomo Part#:ER20472C|Y
01|177703|7|1|Sumitomo Part#:ER16314C|Y
01|177703|8|1|Sumitomo Part#:ER32472|Y
01|177703|9|1|Sumitomo Part#:BT401000SMH|Y
01|177713|3|1|1 riser for 5AX-250OSP4 to clear Y axis|Y
01|177714|1|1|RGA#CUR-58260/|Y
01|177714|1|2|Repair of C40RAM-MI40-180-65TP s/n:65311 01|Y
01|177714|1|3|(Mimatic#184452)|Y
01|177714|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|177714|2|2|1 input and 1 output spindle.|Y
01|177723|1|1|This IS for NST500-OSP300-M ( Not Fanuc ) unit is|Y
01|177723|1|2|in stock ships 6 to 8 weeks ARO for conversion parts|Y
01|177723|1|3|MotorGearsCover & Wiring . Includes Cables to bulk|Y
01|177723|1|4|head. This Table is Pneumatic Clamping|Y
01|177725|2|1|Includes 4th&5th axis Interface All cables install|Y
01|177725|2|2|Labor and travel - Any additional software options|Y
01|177725|2|3|would come from TEXMAC/ MILLMAX|Y
01|177748|1|1|P/N: HSK63F-ER40-125|Y
01|177748|1|2|HSK63F Taper ER40 125mm gauge length|Y
01|177755|1|1|Item is discontinued and is not returnable|Y
01|177766|5|1|Hoses and Fittings|Y
01|177766|11|1|THIS PRICE IS CONTINGENT ON TABLE AND HYD UNIT BEING|Y
01|177766|11|2|SENT TO LYNDEX FOR NEEDED MODIFICATIONS.  THEN LN WILL|Y
01|177766|11|3|SEND TABLE AND HYD UNIT BACK TO C&A ALONG WITH SERVICE|Y
01|177766|11|4|TECHNICIAN TO COMPLETE THE MACHINE SIDE OF INTEGRATION.|Y
01|177772|1|1|3 Port Rotary Joint for 5AX-2MT-105-120|Y
01|177774|1|1|FOR TIGHTENING SK10|Y
01|177774|2|1|FOR TIGHTENING SK20 & 3/4 MILLING CHUCK|Y
01|177774|3|1|FOR TIGHTENING 1 MILLING CHUCK|Y
01|177774|4|1|FOR TIGHTENING ER40|Y
01|177774|5|1|FOR TIGHTENING ER25|Y
01|177774|6|1|HANDLE FOR TQW-E40-G & TQW-E25-G|Y
01|177776|1|1|C5006-32-4.00 w/coolant ports added|Y
01|177776|1|2|C5006-32-4.00CP2|N
01|177778|1|1|Draw nut supplied w/out thread - Threading available|Y
01|177778|1|2|for a fee shown in line 2 as modification charge.|Y
01|177778|2|1|NET ea cost to modify draw thread to customer spec|Y
01|177779|1|1|Req.INS/Check AH Case & Wrenches included or not.|Y
01|177779|2|1|Req. INS/906498 Butler/Kaman *Last Purchase in 2014|Y
01|177782|1|1|BMT65-ER25-AD|Y
01|177782|1|2|Ref. Mimatic drawing 193136|Y
01|177782|1|3|BMT65 ER25 Straight Adjustable Live Tool|Y
01|177789|4|1|Hand Lever for Tailstock|Y
01|177789|8|1|Chuck to Rotary table adapter|Y
01|177789|10|1|Cylinder to Rotary table adapter|Y
01|177789|14|1|Custom draw tube|Y
01|177793|1|1|Currently only 2ea in stock|Y
01|177799|1|1|Currently 2ea in stock|Y
01|177803|1|1|Ref. Mimatic Drawing# 131612|Y
01|177803|1|2|Quoted at NET price for 1-3pcs|Y
01|177827|9|1|HSK100A-SK20C-300|Y
01|177829|1|1|There is a 6 week lead time after receipt of PO.|Y
01|177829|1|2|This will have Sigma 5 motors|N
01|177835|12|1|collapse range 7.14-6.75mm|Y
01|177835|12|2|75TG collet|Y
01|177835|13|1|collapse range 6.75-6.31mm|Y
01|177840|2|1|Extra quantity discount 32->35%.All 5ea must be ordered|Y
01|177840|2|2|at the same time to qualify for the 35% discount|Y
01|177840|3|1|Extra quantity discount 32->38%.All 10ea must be orderd|Y
01|177840|3|2|at the same time to qualify for the 38% discount|Y
01|177855|2|1|Please note: Discount reflects non returnable tool.|Y
01|177855|2|2|1.5MP is very low coolant pressure make sure your|Y
01|177855|2|3|customer is aware of this when quoting.|Y
01|177855|6|1|Internalexternal coolant and can be run dry.|Y
01|177860|7|1|LCH25-SK16|Y
01|177860|7|2|Adjustable type Centering Holder OD 25mm SK16 SlimChuck|Y
01|177860|21|1|LCD|Y
01|177860|21|2|Dial Gauge Magnet mounted|Y
01|177861|1|1|C5007-0020-16.00|Y
01|177862|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|177864|1|1|NET PRICE; WILL NEED TO CHANGE MOTORS TO MITSUBISHI|Y
01|177864|1|2|PART NUMBER WILL BE 5AX-2MT-182-250-205MA-M|Y
01|177864|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|177868|3|1|CUSTOM ADAPTER PLATE FOR WORKHOLDING MOUNT|Y
01|177868|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|177883|2|1|This is a stock item.  We will swap out the nuts|Y
01|177900|1|1|Special item not returnable nor cancelable|Y
01|177900|1|2|Lead will be 4.5-5months ARO|Y
01|177902|1|1|Range: .844-.906 TIR: .0004 or Better|Y
01|177913|1|1|RGA# LVR-58057/|Y
01|177913|1|2|Repair of OK102-17000 s/n:AL263|Y
01|177913|2|1|Bearings O-Rings Collet Nut Spindle Spindle cover|Y
01|177913|2|2|to be replaced.|Y
01|177915|1|1|5AX-500 W/ No Motor - Siemens Control|Y
01|177915|1|2|500PSI Required for Brake System|Y
01|177915|2|1|RN-AX550SD-6+N-A|Y
01|177915|2|2|6 Port Rotary Union|Y
01|177915|4|1|custom machine|Y
01|177915|5|1|custom machine|Y
01|177932|23|1|Quoted at NET price.|Y
01|177940|5|1|Spindle drawing required for custom Block|Y
01|177947|1|1|Anglehead questionaire must be completed|Y
01|177947|1|2|before a PO will be accepted.|Y
01|177957|3|1|This item is considerd special once an order is placed|Y
01|177957|3|2|it cannot be cancelled or returned.|Y
01|177968|1|1|S.MCA40F-A2 Boxed Set|Y
01|177968|1|2|Special item not returnable|Y
01|177968|1|3|NET EA price no additional discount|Y
01|177968|2|1|Special item not cancelable nor returnable|Y
01|177968|3|1|FA40-4 NT40 Face Mill arbor|Y
01|177968|3|2|Special item not cancelable nor returnable|Y
01|177968|4|1|S.MACA40F-A3N  Boxed Set|Y
01|177968|4|2|Special item not returnable|Y
01|177968|4|3|NET EA price no additional discounts|Y
01|177968|5|1|FA40-4 NT40 Face Mill arbor|Y
01|177968|5|2|Special item not cancelable nor returnable|Y
01|177977|1|1|This holder has the ID Chip Hole alreay on tool.|Y
01|177977|2|1|HSK100A-ER32S-160-BN /|Y
01|177977|2|2|HSK100A ER32 Collet Chuck Solid Nut IdChipHole|Y
01|177977|2|3|E32-NUT >> Bearing Nut installed.|Y
01|177977|2|4|This holder comes with ID Chip Hole already on tool.|Y
01|177979|1|1|For NEW Collet.|Y
01|177979|2|1|This item is in used condition and once ordered cannot|Y
01|177979|2|2|be returned. It is unreturnable but will be covered|Y
01|177979|2|3|under warranty for 1 year from date of purchase.|Y
01|177988|5|1|This order wrench OR handle on next line are needed|Y
01|177988|5|2|to work with the wrench attachements.|Y
01|177988|6|1|This torque handle or torque wrench on line above are|Y
01|177988|6|2|needed to work with the torque attachements.|Y
01|177993|2|1|Please Note: Once a purchase order is placed it|Y
01|177993|2|2|can not be cancelled or returned.|Y
01|177998|1|1|Cable sets included|Y
01|178004|1|1|Unit is in stock Ships 2 to 3 weeks A.R.O.|Y
01|178004|1|2|Includes Power and Feedback cables from Rotary to|Y
01|178004|1|3|Machine Bulkhead|Y
01|178007|1|1|unit in stock - ships 2-3 weeks ARO. includes power|Y
01|178007|1|2|and feedback cables from rotary to machine bulkhead|Y
01|178018|7|1|10FT of wiring included|Y
01|178028|1|1|HSK50A Heat shrink .500 3.15 length|Y
01|178028|1|2|Lyndex Part # H50A-SF0500-3.15|Y
01|178028|2|1|HSK50A Heat shrink .375 3.15 length|Y
01|178028|2|2|Lyndex Part # H50A-SF0375-3.15|Y
01|178028|3|1|HSK50A Heat shrink .250 3.15 length|Y
01|178028|3|2|Lyndex Part # H50A-SF0250-3.15|Y
01|178028|4|1|HSK50A-SK16C-120P|Y
01|178051|1|1|P/N: C4006-0500A-1.75|Y
01|178051|1|2|CAT40 1/2 AEROSPACE End Mill Holder w 5DEG angle|Y
01|178051|2|1|Quantity Discount same as above item|Y
01|178051|3|1|P/N: C4006-0500A-2.50|Y
01|178051|4|1|Quantity discount same as above item|Y
01|178051|5|1|P/N: C4006-0500A-4.00|Y
01|178051|6|1|Quantity discount same as above item|Y
01|178051|7|1|P/N: C4006-0750A-1.75|Y
01|178051|8|1|Quantity discount same as above item|Y
01|178051|9|1|P/N: C4006-0750A-3.00|Y
01|178051|10|1|Quanitity discount same as above item|Y
01|178051|11|1|P/N: C4006-0750A-4.00|Y
01|178051|12|1|Quantity discount same as above item|Y
01|178082|1|1|remaining stock in Japan 2-3 wks ARO|Y
01|178105|1|1|This price is for a 1-9 piece order.|Y
01|178105|2|1|This price for 10-19 pieces|Y
01|178105|3|1|Price for 20-29 pieces|Y
01|178105|4|1|For 30-39 pieces|Y
01|178108|1|1|completed questionnaire required for PO acceptance|Y
01|178108|4|1|Machine Make & Model or Drawing of spindle required|Y
01|178109|5|1|P/N: HSK100A-ER32S-100BN|Y
01|178109|5|2|HSK100A Taper ER32 bearing nut 100mm 3.93 g.l.|Y
01|178127|1|1|Quote for 1-12 Pcs ordered|Y
01|178127|2|1|Quote for 13-17 pcs ordered|Y
01|178127|3|1|Quote for 18-20 pcs ordered|Y
01|178127|4|1|Quote for 24+ pcs ordered|Y
01|178127|5|1|CAT40-HC1250-3.00|Y
01|178127|5|2|Quote for 1-12 Pcs ordered|Y
01|178127|6|1|CAT40-HC1250-3.00|Y
01|178127|6|2|Quote for 13-17 pcs ordered|Y
01|178127|7|1|CAT40-HC1250-3.00|Y
01|178127|7|2|Quote for 18-20 pcs ordered|Y
01|178127|8|1|CAT40-HC1250-3.00|Y
01|178127|8|2|Quote for 24+ pcs ordered|Y
01|178158|1|1|S15-ZMACX16-200V|Y
01|178158|2|1|S16-ZMACX17-200V|Y
01|178158|3|1|S19-ZMACX20-230V|Y
01|178165|7|1|Please Note: This tap collet is non standard stock.|Y
01|178165|7|2|Once a purchase order is placed it cannot be cancelled|Y
01|178165|7|3|or returned.|Y
01|178170|7|1|Please Note: This tap collet is non standard stock.|Y
01|178170|7|2|Once a purchase order is placed it cannot be cancelled|Y
01|178170|7|3|or returned.|Y
01|178185|10|1|Replaces TQW-150|Y
01|178186|4|1|Old Style - pre-balance and balanceable|Y
01|178186|4|2|one piece left at special price|Y
01|178186|4|3|*Sale is final- cannot be returned*|Y
01|178186|4|4|Net price|Y
01|178200|3|1|Feedback Cable 2M Special for Fanuc Analog 1-0S motor|Y
01|178200|3|2|ST-90 Connectors.|Y
01|178212|1|1|RGA#TAR-58300|Y
01|178212|1|2|CNCZ180  SN:12166|Y
01|178217|1|1|1st Batch|Y
01|178217|2|1|1st Batch|Y
01|178217|3|1|1st Batch|Y
01|178217|4|1|1st Batch|Y
01|178217|5|1|1st Batch|Y
01|178217|6|1|1st Batch|Y
01|178217|7|1|1st Batch|Y
01|178217|8|1|1st Batch|Y
01|178217|9|1|1st Batch|Y
01|178217|10|1|1st Batch|Y
01|178217|11|1|1st Batch|Y
01|178217|12|1|1st Batch|Y
01|178217|13|1|1st Batch|Y
01|178217|14|1|1st Batch|Y
01|178217|15|1|1st Batch|Y
01|178217|16|1|1st Batch|Y
01|178217|17|1|1st Batch|Y
01|178217|18|1|1st Batch|Y
01|178217|19|1|1st Batch|Y
01|178217|20|1|1st Batch|Y
01|178217|21|1|1st Batch|Y
01|178217|22|1|Req.INS/Install S3/4-16X11/16|Y
01|178217|23|1|1st Batch|Y
01|178217|24|1|1st Batch|Y
01|178217|25|1|Req.INS/GKN-NY|Y
01|178217|25|2|Invoiced QTY 36p PL QTY 37p|Y
01|178245|1|1|1st Batch(w/ScrewOnKey)|Y
01|178245|2|1|Req.INS:Need to check dual contact tolerance.|Y
01|178245|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|178245|4|1|Req.INS/OD=60.5mm?|Y
01|178250|2|1|Cables are standard verify cables.|Y
01|178250|2|2|The current cables are yellow type|Y
01|178267|1|1|RGA#LVR-58280/|Y
01|178267|1|2|REPAIR OF MNZ20-SK16X-ICE-12K S/N:19902304 01|Y
01|178267|1|3|(Mimatic#193568)|Y
01|178267|2|1|Bearings Seals O-Rings to be replaced. Replace|Y
01|178267|2|2|damaged spindle.|Y
01|178267|4|1|REPAIR OF MNZ20-SK16X-ICE-12K S/N:19902304 24|Y
01|178267|4|2|(Mimatic#193568)|Y
01|178267|5|1|BearingsSeals O-Rings to be replaced.|Y
01|178267|7|1|REPAIR OF MNZ20-SK16Z-ICE-12K S/N:19902305 11|Y
01|178267|7|2|(Mimatic#193643)|Y
01|178267|8|2|Bearings Seals O-Rings to be replaced. Recondition|Y
01|178267|8|3|1 input and 1 output spindle.|Y
01|178267|10|1|REPAIR OF MNZ20-SK16Z-ICE-12K S/N:19902305 08|Y
01|178267|10|2|(Mimatic#193643)|Y
01|178267|11|1|Bearings Seals O-Rings to be replaced. Recondition|Y
01|178267|11|2|1 output spindle.|Y
01|178272|2|1|Quoted at NET price.|Y
01|178276|1|1|Give to TIM for INS.. Comes w/screws?|Y
01|178276|2|1|1st batch|Y
01|178276|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|178276|4|1|Req.INS:Need to check dual contact tolerance.|Y
01|178276|5|1|Req.INS:Need to check dual contact tolerance.|Y
01|178278|1|1|4 riser to increase tilt angle to 0-141 degrees|Y
01|178311|9|1|ST62-SF0250-9.50|Y
01|178311|9|2|Straight Shank Ext OD 5/8 SF holder 1/4 9.30 gage|Y
01|178316|3|1|Please ask for P/N: HSK100A-ER32S-100BN|Y
01|178342|2|1|Include Drive and Hand Labor on Site|Y
01|178342|2|2|Include necesary for 4th axis Installation|Y
01|178361|1|1|PleaseNote: OK102-17000 part number has changed|Y
01|178361|1|2|to OKL4-ER40Z. Make sure to take advantage of our|Y
01|178361|1|3|live tool Promo code Promotion Canada and the actual|Y
01|178361|1|4|discount will be 30%.|Y
01|178386|1|1|Due to arrive 6/10|Y
01|178404|6|1|Optional Items for E346Plus|Y
01|178404|17|1|Optional Items for the E346N|Y
01|178421|9|1|Promotion has been applied to the discount quoted.|Y
01|178443|36|1|Inspection of Angle Head Only|Y
01|178444|1|1|RGA#TAR-58314|Y
01|178444|1|2|CNCZ202FA  SN:12096T|Y
01|178450|2|1|Metric option for .118|Y
01|178456|1|1|RGA#TOR-58271/|Y
01|178456|1|2|Repair of CAT50-UMT200UW|Y
01|178456|3|1|Calibration service included.|Y
01|178483|1|1|CAT40-MMC8C-150U-IDU|Y
01|178483|1|2|CAT40 10mm Mini-Mini Chuck IdChipHole Coolant 30000rpm|Y
01|178483|1|3|G2.5|Y
01|178484|6|1|Items are all for Morris South Open House and are not|Y
01|178484|6|2|returnable due to the one time extra deep discounts|Y
01|178487|4|1|Std. External Cable Set for connecting table to machine|Y
01|178487|4|2|2 Cables Per Axis - 1 Power/Signal - 1 Encoder Feedback|Y
01|178487|4|3|This Option is Cables ONLY no installation.|Y
01|178489|1|1|ICE Tools are INT or EXT Coolant 7MP OR Dry Run|Y
01|178491|1|1|CAT40-SK6F-150U-IDU-M|Y
01|178491|1|2|CAT40 SK6 Slim Chuck IdChipHole 20000rpm G2.5 DIN|Y
01|178495|13|1|ETA: approx 6ea 2 weeks ARO balance approx 5 wks ARO|Y
01|178507|12|1|Substitute for E16-NUT-HEX|Y
01|178528|1|1|Ships 2 weeks A.R.O. includes Power and Feed Back|Y
01|178528|1|2|Cables from Machine Bulkhead.|Y
01|178528|1|3|Lyndex Nikken will cover the cost for Bob Ray to|Y
01|178528|1|4|Travel to our Mundlien Head Quarters. We will work|Y
01|178528|1|5|directly with the unit shipping to Daniel Defense.|Y
01|178528|1|6|Will will provide Rotary Table Training and install|Y
01|178528|1|7|procedures.|Y
01|178528|1|8|We will be on-site to install this table with Daniel|Y
01|178528|1|9|Denfense on determined Machine|Y
01|178528|9|1|Hass Install/ Lyndex Nikken|Y
01|178539|1|1|P/N: KM32-9/32|Y
01|178539|1|2|Straigh Collet/Sleeve OD32mm ID 9/32|Y
01|178545|1|1|NET EA pricespecial item non cancelable nor returnable|Y
01|178560|1|1|Net Price includes purchase of BIS-C-122-04/L|Y
01|178560|4|1|Net Price includes purchase of BIS-C-122-04/L|Y
01|178561|1|1|Includes Haas Motor and Cables.|Y
01|178565|1|1|RGA#TAR-58322|Y
01|178565|1|2|5AX200II|Y
01|178566|1|1|NET each price no additional discount|Y
01|178566|1|2|Special item not cancelable nor returnable|Y
01|178571|1|1|RGA#LVR-58303/|Y
01|178571|1|2|Repair of BMT45-ER25Z S/N:19905051 03|Y
01|178571|1|3|(Mimatic#192510)|Y
01|178571|2|1|Bearings seals and O-rings to be replaced.|Y
01|178575|3|1|Pluggable Coolant Ports|Y
01|178575|6|1|Pluggable Coolant Ports|Y
01|178575|7|1|***Special One Time Only Price - old style***|Y
01|178575|7|2|All sales are final. Cannot be returned.|Y
01|178582|1|1|Please check if WRENCH#107446 is included or not.|Y
01|178585|1|1|Head Part|Y
01|178585|2|1|Replacement Cartridge|Y
01|178585|3|1|Insert Set for the CAT50-BCB100-240U|Y
01|178585|3|2|Screw in type Radius .015=0.4mm Grade: Coated|Y
01|178585|3|3|Cermet PV720|Y
01|178585|4|1|Insert Set for the CAT50-BCB100-240U|Y
01|178585|4|2|Screw in type Radius .031=0.8mm Grade: Coated|Y
01|178585|4|3|Cermet PV720|Y
01|178590|1|1|RGA#LVR-58298/|Y
01|178590|1|2|Repair of MNL12-SK20X-ICE-10K s/n 97682 01|Y
01|178590|1|3|(Mimatic# 184649)|Y
01|178590|2|1|Bearings Seals O-Rings to be replaced.|Y
01|178593|2|1|Cables are standard verify cables.|Y
01|178593|2|2|The current cables are yellow type|Y
01|178609|1|1|RGA#LVR-58330/|Y
01|178609|1|2|Repair of MNL12-ER32Z s/n:A1339|Y
01|178609|1|3|(Alps#T32207B03)|Y
01|178609|2|1|Bearings o-rings collet nut small parts and spindle|Y
01|178609|2|2|to be replaced.|Y
01|178626|11|1|Coolant nut wrench|Y
01|178628|2|1|Item is non-standard stock once a PO has been recieved|Y
01|178628|2|2|it can not be cancelled or returned|Y
01|178631|1|1|NON-SEALED|Y
01|178642|1|1|Part # MZQT47-ER32X-OFF-GI2|Y
01|178642|1|2|Mimatic part # 184710|Y
01|178665|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|178669|6|1|Quoted at NET price.|Y
01|178670|1|1|Made in Italy|Y
01|178681|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|178703|1|1|This item has been discontinued.4ea currently in stock|Y
01|178703|1|2|Once those are sold this item is not offered any more|Y
01|178703|3|1|Combine 2 items above for NMTB40 taper|Y
01|178703|5|1|Combine 2 items above for NMTB40 taper|Y
01|178721|3|1|Case and Wrenches Included.|Y
01|178721|9|1|Case and Wrench included.|Y
01|178723|1|1|TAR-58351|Y
01|178723|1|2|NCTZ200ELSA-BR2 SN: 1021C|Y
01|178723|2|1|labor to evaluate test and replace cover|Y
01|178723|3|1|new rotary motor cover with new gasket|Y
01|178723|3|2|Part # KS-CT200L-SA014|Y
01|178755|2|1|Replaces W75R5-0562-3.49(c)|Y
01|178760|6|1|Amada surface grinder|N
01|178760|7|1|no ATC|N
01|178766|1|1|1-9pc|Y
01|178766|2|1|10+pc|Y
01|178768|1|1|This is the the closest we can come to a 40mm.|Y
01|178782|1|1|CAT50-ZL38-180U Auto Depth Control Tap Holder|Y
01|178782|1|2|Tapping Capacity 3/4~1.3/8 UNC & P3/8~1 Pipe|Y
01|178786|1|1|RGA#CUR-58333/|Y
01|178786|1|2|Repair of C50-MRAM s/n:19900593-01|Y
01|178786|1|3|(Mimatic#162732)|Y
01|178786|2|1|Bearings Seals and O-Rings to be replaced.Recondition|Y
01|178786|2|2|1 Input Spindle.|Y
01|178840|3|1|Installation includes: Drive unit short bar fiber|Y
01|178840|3|2|optic cable communications cables bulkhead cables|Y
01|178840|3|3|external cables parameter changes service time and|Y
01|178840|3|4|travel.|Y
01|178854|4|1|P/N: MZST68-ER25-AD-ICE|Y
01|178854|4|2|Mazak Live ER25 STRT Adjustable +/- 107 Deg|Y
01|178854|4|3|IntExtCoolant|Y
01|178867|5|1|Not for Erickson Quick Change|Y
01|178867|7|1|Not for Erickson Quick Change.|Y
01|178867|9|1|Not for Erickson Quick Change|Y
01|178868|1|1|V-Ex Box Set >> V-EX In-Cut Waste Extraction|Y
01|178868|1|2|Quoted at NET price.|Y
01|178868|10|1|#V-EX-Cradle >> holds V-EX body.|Y
01|178868|10|2|Quoted at Net Price|Y
01|178869|1|1|RGA#LVR-58335/|Y
01|178869|1|2|Repair of MZQT47-ER32Z-ICE s/n:20905006 12|Y
01|178869|1|3|(Mimatic#124873)|Y
01|178869|2|1|Adjust tool centerline orientation.|Y
01|178869|4|1|RGA#58335/|Y
01|178869|4|2|Repair of MZQT47-ER32Z-ICE s/n:21900364 01|Y
01|178869|4|3|(Mimatic #124873)|Y
01|178869|5|1|Replace adjustment/locating assembly that was missing|Y
01|178869|5|2|from tool.  Adjust tool centerline orientation.|Y
01|178889|9|1|NET ea price no additional discount|Y
01|178889|9|2|Special item not cancelable nor returnable|Y
01|178889|10|1|NET ea price no additional discount|Y
01|178889|10|2|Special item not cancelable nor returnable|Y
01|178889|11|1|NET ea price no additional discount|Y
01|178889|11|2|Special item not cancelable nor returnable|Y
01|178889|12|1|NET ea price no additional discount|Y
01|178889|12|2|Special item not cancelable nor returnable|Y
01|178889|13|1|ETA: approx 6ea 2 weeks ARO balance approx 5 wks ARO|Y
01|178889|13|2|NET ea price no additional discount|Y
01|178889|13|3|Special item not cancelable nor returnable|Y
01|178889|14|1|Chipe hole will be added|Y
01|178889|14|2|NET EA price no additional discount|Y
01|178894|1|1|Delivery noted:Current delivery 6 Weeks ARO next lot|Y
01|178894|1|2|5 months.|Y
01|178900|5|1|PROMOTION-CANADA 5% has been added to the discount on|Y
01|178900|5|2|this quote.|Y
01|178903|2|1|TCE-A3043/2|Y
01|178903|2|2|Direct monut power cable|Y
01|178903|3|1|TCE-94828/1|Y
01|178903|3|2|Direct mount feedback cable|Y
01|178903|5|1|CNC180LFA match s/n.15972 W/O groove and extra work|Y
01|178903|6|1|TCE-A3016/4|Y
01|178903|6|2|Direct monut power cable|Y
01|178903|7|1|TCE-94828/1|Y
01|178903|7|2|Direct mount feedback cable|Y
01|178903|10|1|TCE-A3043/TCE-94200 Cable set|Y
01|178914|2|1|Price for 2 Special angle heads: $8500.00 less 25%.|Y
01|178926|1|1|RGA#LVR-58341/|Y
01|178926|1|2|Repair of MNL12-ER40Z s/n:N/A|Y
01|178926|1|3|Mimatic#T32214|Y
01|178926|2|1|Bearings seals and o-rings to be replaced.|Y
01|178932|1|1|Installation not included|Y
01|178934|1|1|RGA#TOR-58363/|Y
01|178934|1|2|Repair of CAT40-UMT200UH|Y
01|178934|3|1|Calibration service included.|Y
01|178939|1|1|E236+ PRESETTER W/ ISO40 SPINDLE (CAT40/BT40)|Y
01|178939|2|1|CAT50/BT50 PRESETTER SPINDLE|Y
01|178939|3|1|VDI40 PRESETTER SPINDLE|Y
01|178939|4|1|VDI50 PRESETTER SPINDLE|Y
01|178939|5|1|MASTER GAUGE FOR BT40|Y
01|178939|6|1|MASTER GAUGE FOR CAT40|Y
01|178939|7|1|MASTER HAUGE FOR CAT50|Y
01|178961|5|1|HSK50A 1/2 Shrink Fit|Y
01|178964|1|1|MZQT46-OD75X #14 bolt|Y
01|178970|1|1|RGA#LVR-58357/|Y
01|178970|1|2|Repair of MNL12-ER32Z-ICE-10K s/n:19908584 01|Y
01|178970|1|3|(Mimatic#101523)|Y
01|178970|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|178970|2|2|1 Input & 1 Output Spindle.|Y
01|178980|1|1|P/N: MCM6T-32|Y
01|178980|1|2|Morse Taper Milling Chuck 32mm|Y
01|179000|1|1|5AX-2MT-105-120FA|Y
01|179000|1|2|SN:8247F|Y
01|179009|2|1|HSK100A-0750A-6.00|Y
01|179009|2|2|.750 diameter 6 inch length side lock HSK 100 5 deg.|Y
01|179013|1|1|Calibration service for E578M s/n:1784|Y
01|179013|1|2|This is a time based estimate.|Y
01|179013|1|3|Also any expenses such as meals/fuel/hotel costs to be|Y
01|179013|1|4|charged as needed.|Y
01|179020|2|1|3P RJ CYLINDER TYPE|Y
01|179026|3|1|NC5-46-CLP(PS-123)-BD|Y
01|179026|3|2|Pull Force Meter Adapter NC5-46 w/PS-123-CLP-A|Y
01|179035|1|1|Onetime Demo-Unit Pricing|Y
01|179035|1|2|Carries one year factory warranty|Y
01|179087|1|1|Modified at LYN - install DIN coolant through flange|Y
01|179087|1|2|holes|Y
01|179087|1|3|**modified tool holder - cannot be returned once|Y
01|179087|1|4|purchased|Y
01|179087|4|1|Unit is DIN coolant through the flange from factory|Y
01|179087|4|2|Extra feature: balanced and balanceable|Y
01|179087|4|3|1pc left. Special price / All sales are final|Y
01|179109|2|1|EXTERNAL POWER/FEEDBACK CABLES INCLUDED WITH COST|Y
01|179109|2|2|OF THE CNC180 ROTARY TABLE.|Y
01|179109|3|1|DRIVE BULKHEAD WIRING AND CONNECTORS ARE ALREADY|Y
01|179109|3|2|PRESENT; THIS INSTALLATION FEE OF $4500 WILL COVER|Y
01|179109|3|3|LABOR COST TRAVEL AND LODGING EXPENSES FOR L-N|Y
01|179109|3|4|SERVICE TECHNICIAN.|Y
01|179115|3|1|Shipping Chucks first them adapter after Syracus|Y
01|179115|3|2|contacts us with the measurements for modification.|Y
01|179122|1|1|HSK63A-MDSK13-120  HSK63A SK13 Major Dream Holder|Y
01|179122|2|1|CAT40N-MDSK13-120U-IDU CAT40 SK13 Major Dream Holder|Y
01|179122|2|2|Price reflects a purchase order of 1~9 tool holders.|Y
01|179122|3|1|CAT40N-MDSK13-120U-IDU CAT40 SK13 Major Dream Holder|Y
01|179122|3|2|Price reflects a purchase order of 10~19 tool holders.|Y
01|179122|4|1|CAT40N-MDSK13-120U-IDU CAT40 SK13 Major Dream Holder|Y
01|179122|4|2|Price reflects a purchase order of 20+ tool holders.|Y
01|179130|1|1|CAT50-AF1-30-OH|Y
01|179130|1|2|CAT50 Automatic Back Spot Facing|Y
01|179130|2|1|CAT50U-AF1-30-OH|Y
01|179130|2|2|CAT50 Automatic Back Spot Facing|Y
01|179130|3|1|CAT50-AF1-30-OH|Y
01|179130|3|2|CAT50 Automatic Back Spot Facing|Y
01|179130|4|1|CAT50-AF1-30-OH|Y
01|179130|4|2|CAT50 Automatic Back Spot Facing|Y
01|179130|5|1|BF130-18-35-20.1C|Y
01|179130|5|2|Back Sport Facing Arbor|Y
01|179130|6|1|BF130-18-35-20.1C|Y
01|179130|6|2|Back Sport Facing Arbor|Y
01|179130|7|1|BF130-18-35-20.1C|Y
01|179130|7|2|Back Sport Facing Arbor|Y
01|179130|8|1|BF130-18-35-20.1C|Y
01|179130|8|2|Back Sport Facing Arbor|Y
01|179130|9|1|9BF130-18-35-20.1C-W|Y
01|179130|9|2|Carbide byte for back spot facing arbor.|Y
01|179130|9|3|MINUMUM ORDER QUANTITY: 3pc|Y
01|179171|1|1|MNL12-ER25Z-MD-ICE (2pcs)|Y
01|179171|2|1|MNL12-ER25Z-MD-ICE (5pcs)|Y
01|179171|3|1|MNL12-ER25Z-MSD-ICE (1pc)|Y
01|179171|4|1|MNL12-ER25Z-MSD-ICE (2pcs)|Y
01|179171|5|1|MNL12-ER25Z-MSD-ICE (5pcs)|Y
01|179171|6|1|MZST68-ER32-AD-ICE|Y
01|179175|13|1|ETA: approx 6ea 2 weeks ARO balance approx 5 wks ARO|Y
01|179183|1|1|HSK100A ER40 CHUCK 11 GL|Y
01|179197|10|1|ONE 8 HOUR DAY TO INSTALL AND TRAIN INCLUDED|Y
01|179199|9|1|TWO 8 HOUR DAYS FOR INSTALLATION & TRAINING INCLUDED|Y
01|179203|1|1|This Part Number Does NOT Include Motor|Y
01|179203|2|1|External Power/Feedback Cables For 4th Axis|Y
01|179203|2|3|Workholding Not Included In This Quote|Y
01|179204|7|1|SP Angle Head. MOQ: 1|Y
01|179204|7|2|`|N
01|179207|2|1|Installation includeds: Drive unit short bar fiber|Y
01|179207|2|2|optic cable communciations cable bulkhead cables|Y
01|179207|2|3|external cables parameter changes service time and|Y
01|179207|2|4|travel.|Y
01|179211|3|1|All sales final!|Y
01|179215|2|1|Items to be order with Q179219 for Haas Position Block|Y
01|179219|1|1|To be ordered with Q179215 Speeder and cooling unit|Y
01|179229|2|1|K32-SK20-150|Y
01|179229|2|2|Straight Shank Extension OD32mm SK20 Slim Chuck L:150mm|Y
01|179229|3|1|K32-SK20-180|Y
01|179229|3|2|Straight Shank Extension OD32mm SK20 Slim Chuck L:180mm|Y
01|179241|1|1|These are the same price regardless of quantity.|Y
01|179241|1|2|We currently have 33 in stock|Y
01|179248|1|1|RGA#CUR-58344/|Y
01|179248|1|2|Repair of C50RAM-ER25-215ST-110TP s/n:19906291 01|Y
01|179248|1|3|(Mimatic#184454)|Y
01|179248|2|1|Bearings seals o-rings damaged housing and cover|Y
01|179248|2|2|plate to be replaced. Recondition 1 input & 1 output|Y
01|179248|2|3|spindle.|Y
01|179251|28|1|NET EA PRICE - HSK100A-FMH22-60-60 Face Mill Arbor|Y
01|179251|28|2|Special item not cancelable/returnable once ordered|Y
01|179251|29|1|NET EA PRICE - HSK100A-FMH22-60-105 Face Mill Arbor|Y
01|179251|29|2|Special item not cancelable/returnable once ordered|Y
01|179251|30|1|NET EA PRICE - HSK100A-FMH22-60-150 Face Mill Arbor|Y
01|179251|30|2|Special item not cancelable/returnable once ordered|Y
01|179251|31|1|NET EA PRICE - HSK100A-FMH27-60-60 Face Mill Arbor|Y
01|179251|31|2|Special item not cancelable/returnable once ordered|Y
01|179251|32|1|NET EA PRICE - HSK100A-FMH27-60-90 Face Mill Arbor|Y
01|179251|32|2|Special item not cancelable/returnable once ordered|Y
01|179251|33|1|NET EA PRICE - HSK100A-FMH27-60-150 Face Mill Arbor|Y
01|179251|33|2|Special item not cancelable/returnable once ordered|Y
01|179251|43|1|Wrench for above drill chuck|Y
01|179256|1|1|Item is being discontinued only 4 pcs on the shelf|Y
01|179270|5|1|Wrench needed for ER32 Live Tool Option|Y
01|179274|1|1|P/N: BMT45-ER25X-GR2|Y
01|179274|1|2|BMT45 Live ER25 X-Axis <Radial> ExtCoolant;|Y
01|179274|1|3|2:1 Gear High Torque|Y
01|179274|1|4|Ref: Mim#176867|Y
01|179275|8|1|Includes: Travel/Labor Time Food/Hotel/Gas and Other|Y
01|179275|8|2|Expenses.(Travel 2days 1day Labor)|Y
01|179280|8|1|Includes: Travel/Labor Time Food/Hotel/Gas and Other|Y
01|179280|8|2|Expenses.(Travel 2days 1day Labor)|Y
01|179294|6|1|Optional but recommended|Y
01|179294|7|1|Optional but recommended|Y
01|179306|6|1|Optional but recomended|Y
01|179306|8|1|Optional but recomended|Y
01|179313|1|1|Please Note: Discount reflects a purchase order of|Y
01|179313|1|2|1 to 3 live tools.|Y
01|179313|2|1|Please note: Discount reflects a purchase order of|Y
01|179313|2|2|4 to 5 holders.|Y
01|179333|1|1|RGA#CUR-58307/|Y
01|179333|1|2|Repair of 1 x C50RAM-ER32-180-110TP s/n:19904361 01|Y
01|179333|1|3|(Mimatic#178111)|Y
01|179333|2|1|Bearings seals o-rings 1 input spindle and 1 output|Y
01|179333|2|2|spindle to be replaced.|Y
01|179333|4|1|Repair of 1 x C50RAM-ER32-180-110TP s/n:19904361 02|Y
01|179333|4|2|(Mimatic#178111)|Y
01|179333|5|1|Bearings seals o-rings 1 input spindle and 1 output|Y
01|179333|5|2|spindle to be replaced. Add new ID plate.|Y
01|179334|1|1|Comes with Table Motor and Ext. Cables for OSP4|Y
01|179334|1|2|Install done by Gosiger/Okuma|Y
01|179339|1|1|1st Batch|Y
01|179339|2|1|1st Batch|Y
01|179339|3|1|1st Batch|Y
01|179339|4|1|1st Batch|Y
01|179339|5|1|1st Batch|Y
01|179339|6|1|1st Batch|Y
01|179339|7|1|Req. INS/C6-ER16-100 Install E16-NUT & ER16-SCREW(C)|Y
01|179339|7|2|RPLC/NCR308-1 BT-DT>WH1 upon INS.|Y
01|179339|8|1|Req. INS/C6-ER32-60 Install E32-NUT & ER32-SCREW(C)|Y
01|179339|8|2|RPLC/NCR306-1 BT-DT>WH1 upon INS.|Y
01|179339|9|1|Req. INS/Packing List:NCAT40-SF0500-5.12CP|Y
01|179341|4|1|This item is considered special once ordered it cannot|Y
01|179341|4|2|be cancelled or returned|Y
01|179341|4|3|ETA 10-12 Weeks after drawing approval. New part #.|Y
01|179343|1|1|Includes Cable Set x 2|Y
01|179343|3|1|Includes Cable Set x 2|Y
01|179343|3|2|* Requires Hydraulic Unit for Clamping. Hydraulic Unit|Y
01|179343|3|3|quoted seperately.|Y
01|179351|1|1|!ea currently in stock.If stock is no longer avail by|Y
01|179351|1|2|the time an order is placed we will need to requote|Y
01|179351|1|3|for price and delivery|Y
01|179356|17|1|FACTORY HAS 18 OF THESE IN STOCK (2 WEEKS DELIVERY)|Y
01|179356|21|1|FACTORY HAS 25 IN STOCK (2 WEEK DELIVERY ON THOSE)|Y
01|179364|1|1|1st Batch|Y
01|179366|1|1|Cheersun AIR#05162201-A|N
01|179366|1|2|INS:Not Req'd.|N
01|179366|2|1|Cheersun AIR#05162201-A|Y
01|179366|2|2|INS:Not Req'd.|N
01|179366|3|1|Cheersun AIR#05162201-A|Y
01|179366|3|2|INS:Not Req'd.|N
01|179379|1|1|ST62-SF0250-9.50|Y
01|179379|1|2|Straight Shank Ext OD 5/8 SF holder 1/4 9.30 gage|Y
01|179382|1|1|Not returnable/refundable|Y
01|179396|7|1|Installation and Training Included.Onsite follow up|Y
01|179396|7|2|Software Updates Included|Y
01|179414|5|1|2nd pc will be a special|Y
01|179416|2|1|This item cannot be returned. This size is discontinued|Y
01|179452|1|1|Please Note: Discount reflects a purchase order of|Y
01|179452|1|2|1 to 10 holders.|Y
01|179452|3|1|Please Note: Discount reflects a purchase order of|Y
01|179452|3|2|11~20 holders.|Y
01|179452|5|1|Please Note: Discount reflects a purchase order of|Y
01|179452|5|2|21+ holders.|Y
01|179452|10|1|Special Offer Retention knobs are $5.00 net for each|Y
01|179452|10|2|matching taper holder purchased.|Y
01|179458|1|1|INS Req'd:Give 2p to SVC|Y
01|179458|2|1|INS Req'd:Give 2p to SVC|Y
01|179458|3|1|INS Req'd:Give 2p to SVC|Y
01|179458|4|1|INS Req'd:905421/Buckeye/HitachiAstemo(AmericanShowa)|Y
01|179469|8|1|SPECIAL NET PRICE - COST MATCH TO CAT50-SK16-195U-IDU|Y
01|179469|8|2|ABOVE (LINE ITEM #4)|Y
01|179469|8|3|MAKE SURE TO ADD YOUR MARGIN FOR THIS ITEM.|Y
01|179469|9|1|SPECIAL NET PRICE - COST MATCH TO CAT50-SK10-195U-IDU|Y
01|179469|9|2|ABOVE (LINE ITEM #6)|Y
01|179469|9|3|MAKE SURE TO ADD YOUR MARGIN FOR THIS ITEM.|Y
01|179469|12|1|SPECIAL NET PRICE|Y
01|179476|8|1|PRICING TBD FROM CUST MACHINE INSPECTION|Y
01|179476|9|1|PRICING TBD FROM CUST MACHINE INSPECTION|Y
01|179476|10|1|TBD based off of customer machine inspection.|Y
01|179477|1|1|Wrench for SK10 Standard Holders|Y
01|179477|2|1|Wrench for SK16 Standard Holder|Y
01|179477|3|1|Wrench for SK20 and SK25 Standard Holders|Y
01|179480|3|1|ref. 155460|Y
01|179480|4|1|ref. 155441|Y
01|179480|5|1|ref. 155445|Y
01|179480|6|1|ref. 121489|Y
01|179480|7|1|ref. 121529|Y
01|179480|8|1|ref. 121525|Y
01|179480|9|1|ref. 121520|Y
01|179480|10|1|ref. 121526|Y
01|179480|12|1|FOR MI50-ER32I|Y
01|179480|13|1|For MI50-ER32|Y
01|179484|1|1|Price and delivery pending|Y
01|179486|6|1|Standard- Coolant Through the Spindle|Y
01|179486|7|1|new part# NCAT50-C1.1/4F-105U-IDUM|Y
01|179486|7|2|NCAT50 Dual Contact 1.1/4 Milling Chuck IDChip Hole|Y
01|179486|7|3|**Modified - DIN Form B Coolant Through The Flange|Y
01|179486|7|4|**Special - cannot be returned**|Y
01|179486|9|1|**Old Style 3-Lock for Dual Contact CAT50 Taper**|Y
01|179486|9|2|DIN Form B Coolant Through The Flange straight from|Y
01|179486|9|3|factory|Y
01|179486|9|4|gage length 90mm|Y
01|179486|9|5|**All sales are final. Special net price**|Y
01|179495|1|1|RAH form required for PO acceptance|Y
01|179496|1|1|RGA#QUA-58373/|Y
01|179496|1|2|Repair of B50FHM-ER32-225-110TP s/n:21907532 01|Y
01|179496|1|3|(Mimatic#199804)|Y
01|179496|2|1|O-rings spring pin and partial housing to be replaced.|Y
01|179507|1|1|Req. INS/Rework?|Y
01|179507|2|1|Req. INS/Install (2)S3/4-16X11/16|Y
01|179507|3|1|Req. INS/Install (2)S3/4-16X11/16|Y
01|179507|4|1|Req. INS/Install E20-NUT & ER20-SCREW(C)|Y
01|179561|4|1|Due 6/28|Y
01|179561|5|1|We will need to get price and delivery|Y
01|179561|7|1|Due 6/28|Y
01|179561|8|1|Due 7/14|Y
01|179570|1|1|2 to 3 week delivery after receipt of order - pack of|Y
01|179570|1|2|10. same qty and delivery for all part numbers|Y
01|179571|6|1|Optional but recommended|Y
01|179571|7|1|Optional but recommended|Y
01|179585|1|1|Seal Kit for a Howa HO12M10-A8 Chuck|Y
01|179585|1|2|On quote file for Risa to check with Howa|Y
01|179601|1|1|1st Batch/For stock 9/29 Approved by Tim|Y
01|179604|2|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|2|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|2|3|ETA AND PRICE PENDING|Y
01|179604|3|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|3|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|3|3|ETA AND PRICE PENDING|Y
01|179604|4|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|4|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|4|3|ETA AND PRICE PENDING|Y
01|179604|5|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|5|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|5|3|ETA AND PRICE PENDING|Y
01|179604|6|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|6|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|6|3|ETA AND PRICE PENDING|Y
01|179604|7|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|7|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|7|3|ETA AND PRICE PENDING|Y
01|179604|8|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|8|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|8|3|ETA AND PRICE PENDING|Y
01|179604|9|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|9|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|9|3|ETA AND PRICE PENDING|Y
01|179604|10|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|10|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|10|3|ETA AND PRICE PENDING|Y
01|179604|11|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|11|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|11|3|ETA AND PRICE PENDING|Y
01|179604|12|1|SPECIAL ORDER NON-STANDARD ITEM NON-CANCELABLE &|Y
01|179604|12|2|NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|179604|12|3|ETA AND PRICE PENDING|Y
01|179609|6|1|Air/Hyd Booster supply for Pancake Cylinder|Y
01|179609|7|1|Air lever for tailstocks|Y
01|179609|8|1|SUBPLATE for Above items|Y
01|179613|1|1|1st Batch/913991 *DWG Saved in Teams File|Y
01|179614|5|1|MOQ: 1|Y
01|179614|6|1|MOQ: 2|Y
01|179616|15|1|1ea in stock at the factory|Y
01|179616|16|1|1ea in stock at the factory|Y
01|179682|1|1|Wrenches Included|Y
01|179682|3|1|Wrenches Included|Y
01|179696|1|1|Please note: Discount reflects non returnable tool.|Y
01|179696|1|2|1.5MP is very low coolant pressure make sure you|Y
01|179696|1|3|customer is aware of this when quoting.|Y
01|179704|1|1|BMT55-ER32Z-HS2-ICE-85|Y
01|179704|1|2|BMT55 Live ER32 Z-Axis 90Deg<Axial> Internal & External|Y
01|179704|1|3|Coolant 7MP / Center Height 85mm 1:2 Ratio|Y
01|179704|1|4|Mimatic #194298|Y
01|179710|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|179712|1|1|CAT50-CZF32-105U|Y
01|179712|1|2|CAT50 Bulls Eye Zero Fit Milling Chuck C32 8000rpm|Y
01|179717|1|1|part# KM3/4-11|Y
01|179717|1|2|Straight Collet/Sleeve OD3/4 ID 11mm|Y
01|179720|6|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|179724|4|1|*Includes (4)SK20 Collet please specify sizes.|Y
01|179726|1|1|1-29pcs|Y
01|179726|2|1|30-39pcs|Y
01|179726|3|1|40-49pcs|Y
01|179726|4|1|50+pcs|Y
01|179729|3|1|Intallation Includes: optic cables communication|Y
01|179729|3|2|cables parameter changes service time and travel|Y
01|179730|1|1|Tool to be hand loaded only|Y
01|179736|1|1|S#6680|Y
01|179757|2|1|RUS2204ET2X Radial Roller Bearing Large|Y
01|179778|2|1|Kuraki AKB13|Y
01|179778|2|2|Design + Modification required.|Y
01|179790|1|1|HOLDERS ARE DUE TO US 7/13; CURRENTLY ON A BOAT;|Y
01|179790|1|2|COULD BE FASTER OR SLOWER THAN THAT ESTIMATE|Y
01|179790|6|1|WILL CONVERT STANDARD STOCK TO HIGH SPEED|Y
01|179790|6|2|LEAD TIME APPROXIMATELY 1 WEEK|Y
01|179794|1|1|Due ETA 6/10/2022 to Lyndex Nikken|Y
01|179819|4|1|This item is discontinued. Once ordered it cannot be|Y
01|179819|4|2|returned.|Y
01|179824|8|1|CAT40-SK13-180UP-IDU > USE THIS PART NUMBER|Y
01|179824|8|2|HAVE STANDARD SPEED IN STOCK > CONVERT TO HIGH SPEED|Y
01|179824|13|1|CAT50-SK20-105UP-IDU > USE THIS PART NUMBER|Y
01|179824|15|1|CAT50-SK13-195UP-IDU > USE THIS PART NUMBER|Y
01|179824|17|1|NCAT50-SK10C-195UP-IDU > USE THIS PART NUMBER|Y
01|179835|3|1|This is a discontinued once ordered it cannot be|Y
01|179835|3|2|returned.|Y
01|179863|1|1|Req. INS/900940 A.W. Miller 2/16/22:DWG Aprv'd/Customer|Y
01|179891|1|1|CAT50-ER50-6.00 W/2-HOLE DIN MODIFICATION|Y
01|179891|1|2|CONSIDERED NON-STANDARD NON-STOCK ITEM|Y
01|179891|1|3|NON-CANCELABLE & NON_RETURNABLE AFTER RECEIPT OF PO|Y
01|179891|1|4|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|179897|1|1|RGA#TOR-58324/|Y
01|179897|1|2|Repair of CAT50-SZF10-105U|Y
01|179897|5|1|RGA#TOR-58324/|Y
01|179897|5|2|Repair of CAT50-SZF10-105U|Y
01|179897|9|1|RGA#TOR-58324/|Y
01|179897|9|2|Repair of CAT50-SZF10-105U|Y
01|179897|13|1|RGA#TOR-58324/|Y
01|179897|13|2|Repair of CAT50-SZF16-105U|Y
01|179897|17|1|RGA#TOR-58324/|Y
01|179897|17|2|Repair of CAT50-SZF16-105U|Y
01|179897|21|1|RGA#TOR-58324/|Y
01|179897|21|2|Repair of CAT50-SZF16-105U|Y
01|179897|25|1|RGA#TOR-58324/|Y
01|179897|25|2|Repair of CAT50-SZF25-120U|Y
01|179901|17|1|- Replacment for standared Heat ring in Kit|Y
01|179901|18|1|- Replacment for standared Heat ring in Kit|Y
01|179901|19|1|- Replacment for standared Heat ring in Kit|Y
01|179901|20|1|- Replacment for standared Heat ring in Kit|Y
01|179905|1|1|VCK6-2.5 >>  VCK6 Collet 2.5mm|Y
01|179905|1|2|PLEASE NOTE: VCK6-2.5 is a non stock tool. Once an|Y
01|179905|1|3|order is placed it cannot be cancelled or returned.|Y
01|179905|2|1|VCK6-2.5 >>  VCK6 Collet 2.5mm|Y
01|179905|2|2|PLEASE NOTE: VCK6-2.5 is a non stock tool. Once an|Y
01|179905|2|3|order is placed it cannot be cancelled or returned.|Y
01|179905|3|1|VCK13-2.5 >> VCK13 Collet 2.5mm|Y
01|179905|3|2|PLEASE NOTE: VCK13-2.5 is a non stock tool. Once an|Y
01|179905|3|3|order is placed it cannot be cancelled or returned.|Y
01|179905|4|1|VCK13-2.5 >> VCK13 Collet 2.5mm|Y
01|179905|4|2|PLEASE NOTE: VCK13-2.5 is a non stock tool. Once an|Y
01|179905|4|3|order is placed it cannot be cancelled or returned.|Y
01|179905|5|1|VCK6-7/64 >>  VCK6 Collet 7/64|Y
01|179905|5|2|PLEASE NOTE: VCK6-7/64 is a non stock tool. Once an|Y
01|179905|5|3|order is placed it cannot be cancelled or returned.|Y
01|179905|6|1|VCK6-7/64 >>  VCK6 Collet 7/64|Y
01|179905|6|2|PLEASE NOTE: VCK6-7/64 is a non stock tool. Once an|Y
01|179905|6|3|order is placed it cannot be cancelled or returned.|Y
01|179905|7|1|VCK13-7/64 >>  VCK13 Collet 7/64|Y
01|179905|7|2|PLEASE NOTE: VCK13-7/64 is a non stock tool. Once an|Y
01|179905|7|3|order is placed it cannot be cancelled or returned.|Y
01|179905|8|1|VCK13-7/64 >>  VCK13 Collet 7/64|Y
01|179905|8|2|PLEASE NOTE: VCK13-7/64 is a non stock tool. Once an|Y
01|179905|8|3|order is placed it cannot be cancelled or returned.|Y
01|179905|9|1|VCK6-1/32 >>  VCK6 Collet 1/32|Y
01|179905|9|2|PLEASE NOTE: VCK6-1/32 is a non stock tool. Once an|Y
01|179905|9|3|order is placed it cannot be cancelled or returned.|Y
01|179905|10|1|VCK6-1/32 >>  VCK6 Collet 1/32|Y
01|179905|10|2|PLEASE NOTE: VCK6-1/32 is a non stock tool. Once an|Y
01|179905|10|3|order is placed it cannot be cancelled or returned.|Y
01|179905|11|1|VCK13-1/32 >>  VCK13 Collet 1/32|Y
01|179905|11|2|PLEASE NOTE: VCK13-1/32 is a non stock tool. Once an|Y
01|179905|11|3|order is placed it cannot be cancelled or returned.|Y
01|179905|12|1|VCK13-1/32 >>  VCK13 Collet 1/32|Y
01|179905|12|2|PLEASE NOTE: VCK13-1/32 is a non stock tool. Once an|Y
01|179905|12|3|order is placed it cannot be cancelled or returned.|Y
01|179905|13|1|VCK6-3/32 >>  VCK6 Collet 3/32|Y
01|179905|13|2|PLEASE NOTE: VCK6-3/32 is a non stock tool. Once an|Y
01|179905|13|3|order is placed it cannot be cancelled or returned.|Y
01|179905|14|1|VCK6-3/32 >>  VCK6 Collet 3/32|Y
01|179905|14|2|PLEASE NOTE: VCK6-3/32 is a non stock tool. Once an|Y
01|179905|14|3|order is placed it cannot be cancelled or returned.|Y
01|179905|15|1|VCK13-3/32 >>  VCK13 Collet 3/32|Y
01|179905|15|2|PLEASE NOTE: VCK13-3/32 is a non stock tool. Once an|Y
01|179905|15|3|order is placed it cannot be cancelled or returned.|Y
01|179905|16|1|VCK13-3/32 >>  VCK13 Collet 3/32|Y
01|179905|16|2|PLEASE NOTE: VCK13-3/32 is a non stock tool. Once an|Y
01|179905|16|3|order is placed it cannot be cancelled or returned.|Y
01|179905|17|1|VCK6-1/16 >>  VCK6 Collet 1/16|Y
01|179905|17|2|PLEASE NOTE: VCK6-1/16 is a non stock tool. Once an|Y
01|179905|17|3|order is placed it cannot be cancelled or returned.|Y
01|179905|18|1|VCK6-1/16 >>  VCK6 Collet 1/16|Y
01|179905|18|2|PLEASE NOTE: VCK6-1/16 is a non stock tool. Once an|Y
01|179905|18|3|order is placed it cannot be cancelled or returned.|Y
01|179905|19|1|VCK13-1/16 >>  VCK13 Collet 1/16|Y
01|179905|19|2|PLEASE NOTE: VCK13-1/16 is a non stock tool. Once an|Y
01|179905|19|3|order is placed it cannot be cancelled or returned.|Y
01|179905|20|1|VCK13-1/16 >>  VCK13 Collet 1/16|Y
01|179905|20|2|PLEASE NOTE: VCK13-1/16 is a non stock tool. Once an|Y
01|179905|20|3|order is placed it cannot be cancelled or returned.|Y
01|179912|3|1|MOQ: 1  Special Order Item. Net Price Each.|Y
01|179912|7|1|Kuraki America AKB-13|Y
01|179912|7|2|Design + Modification Required.|Y
01|179914|1|1|16-17 WEEKS ARO (INCLUDES 4 WEEKS FOR DESIGN/APPROVAL)|Y
01|179914|2|1|16-17 WEEKS ARO (INCLUDES 4 WEEKS FOR DESIGN/APPROVAL)|Y
01|179926|1|1|Special item not returnable|Y
01|179926|2|1|Special item not returnable|Y
01|179935|1|1|P/N: MZL60-ER32(X)-SP|Y
01|179935|1|2|Mori Live ER32 X-Axis STRT U-Shape Special|Y
01|179935|1|3|BMT110; L=725mm; L1=614mm; 1:1 Gear Max 20Nm; 6000 RPM|Y
01|179935|1|4|INTERNAL COOLANT THROUGH SPINDLE|Y
01|179935|1|5|Ref Drwg#00040189|Y
01|179935|1|6|#176581|Y
01|179935|3|1|P/N: MZL60-ER25(X)-SP|Y
01|179935|3|2|Mori Live ER25 X-Axis STRT U-Shape Special|Y
01|179935|3|3|BMT100; L=325mm; L1=270mm; 1:1 Gear Max 50Nm; 6000 RPM|Y
01|179935|3|4|EXTERNAL COOLANT OVER PIPE|Y
01|179935|3|5|REF Drwg#00049339|Y
01|179935|3|6|#188010|Y
01|179958|4|1|Installation includes: Dual axis drive short bar|Y
01|179958|4|2|fiber optic cables communications cables bulkhead|Y
01|179958|4|3|cables external cables parameter changes service|Y
01|179958|4|4|time and travel. Installation to take two days.|Y
01|179966|8|1|MOQ: 1-4|Y
01|179966|18|1|MOQ: 51+  Shipping Cost is NOT Included.|Y
01|179976|5|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALLATION|Y
01|179976|5|2|AND TRAINING.|Y
01|179990|3|1|Includes required 80AMP Drive & Cables|Y
01|180000|1|1|For GE Aviation in ROMANIA|N
01|180006|2|1|**Customer would need to make a Riser Plate to match|Y
01|180006|2|2|140mm Center Height of existing DDRT200 Rotary Table.|Y
01|180006|2|3|MT-135S is standard 110mm Center Height and comes with|Y
01|180006|2|4|a 25mm Riser Plate.|Y
01|180022|1|1|For PO# 879697|Y
01|180033|1|1|CNCZ321MA Storage Service Annual Fee @ Lyndex-Nikken.|Y
01|180036|1|1|Standard Plastic Conduit Cables used by LyndexNikken|Y
01|180036|4|1|Steel Braided Conduit Covering|Y
01|180036|5|1|Steel Braided Conduit Covering|Y
01|180068|4|1|Hwacheon Ladder options need to be purchased through|Y
01|180068|4|2|Hwacheon not provided by Lyndex|Y
01|180068|9|1|Hwacheon Ladder options need to be purchased through|Y
01|180068|9|2|Hwacheon not provided by Lyndex|Y
01|180078|1|1|RPLC Q#180000|Y
01|180084|1|1|PS-5016 Pull Stud for Okuma Howa Coolant Thru|Y
01|180084|2|1|PS-5024 Pull Stud for Okuma Howa Coolant Thru|Y
01|180104|1|1|1st Batch/909543 Hurst 3/4/22:DWG Approved/Customer|Y
01|180104|2|1|1st Batch/(2)910473 Grainger/DOC 3/25:DWG Approved/TR|Y
01|180112|2|1|Installation includes: Dual axis drive short bar|Y
01|180112|2|2|communications cables fiber optic cables bulkhead|Y
01|180112|2|3|cables external cables parameter changes service|Y
01|180112|2|4|time and travel.|Y
01|180156|2|1|Not avail as coolant sealed|Y
01|180188|1|1|CAT40-FMA38.1-60U-IDU|Y
01|180188|1|2|CAT40 Shell/Face Mill Holder 1.1/2|Y
01|180191|1|1|PLEASE NOTE: K32-SK10-120 is a non stock tool. Once an|Y
01|180191|1|2|order is placed it cannot be cancelled or returned.|Y
01|180191|2|1|Currently only one stk at Nikken. Delivery is 2-3wks if|Y
01|180191|2|2|order is placed within this wk. Otherwise delivery is|Y
01|180191|2|3|13 weeks.|Y
01|180191|2|4|PLEASE NOTE: K32-SK16-120 is a non stock tool. Once an|Y
01|180191|2|5|order is placed it cannot be cancelled or returned.|Y
01|180191|3|1|PLEASE NOTE: K32-SK25-150 is a non stock tool. Once an|Y
01|180191|3|2|order is placed it cannot be cancelled or returned.|Y
01|180196|6|1|CCT25-12-165|Y
01|180196|6|2|Nikken Centering Tool|Y
01|180197|1|1|Req. INS/TaperPlus Holder|Y
01|180197|2|1|1st Batch|Y
01|180205|4|1|P/N: MI50-SM1|Y
01|180205|4|2|Shell Mill holder quick change attachment w/ 1 pilot|Y
01|180205|7|1|P/N: H63ARAM-MI50-187-65TP|Y
01|180205|7|2|HSK63A Taper Angle Head w/ MI50 quick change|Y
01|180205|7|3|capabilities. NO Coolant version; 6500 MAX RPM;|Y
01|180205|7|4|70 Nm MAX TORQUE; 1:1 Gear Max|Y
01|180205|7|5|Ref # 00043147|Y
01|180205|7|6|180273|Y
01|180205|8|1|P/N:H63ARAM-MI50-187IC-65TP|Y
01|180205|8|2|Same as above with COOLANT THROUGH THE SPINDLE ;|Y
01|180205|8|3|EXT COOLANT THROUGH PIPE|Y
01|180205|8|4|Ref# 00055430|Y
01|180205|10|1|P/N: MI50-SM1|Y
01|180205|10|2|Shell Mill holder quick change attachment w/ 1 pilot|Y
01|180206|3|1|The 2 lines above are the wrench handle and attachement|Y
01|180206|3|2|for this holder|Y
01|180256|1|1|One time special price for show table.|Y
01|180292|1|1|(Refurbished version from Fanuc) Fanuc has Stock|Y
01|180292|3|1|TCE-93629/1|Y
01|180292|4|1|TCE-43349/2|Y
01|180292|5|1|TCE-43348/3|Y
01|180292|6|1|TCE-93628/3|Y
01|180294|1|1|Replaces CAT50-SF0500-3.15|Y
01|180294|5|1|Replaces NC4001-0750-4.00|Y
01|180294|7|1|Replaces C4017-0025-4.00|Y
01|180294|8|1|Repaces CAT50-OKUMA(OH)|Y
01|180294|9|1|Replaces CAT40-STD(B)|Y
01|180294|10|1|Replaces NCAT40-SF0500-3.15|Y
01|180295|1|1|NET EA pricespecial itemnot cancelable nor returnable|Y
01|180295|2|1|NET EA pricespecial itemnot cancelable nor returnable|Y
01|180315|1|1|RGA#TAR-58446|Y
01|180315|1|2|CNCZ180SA-BR2-R650X2-QT2|Y
01|180320|1|1|5ft airline 5ft coil spring air fitting|Y
01|180324|1|1|RGA#TAR-58375|Y
01|180324|1|2|5AX-130YA-M|Y
01|180327|1|1|This one is discontinued once ordered cannot be|Y
01|180327|1|2|cancelled or returned.|Y
01|180333|5|1|Size:26 x 32 x 4|Y
01|180333|6|1|Size:32 x 37 x 4|Y
01|180335|19|1|In stock substitute to the Back Ordered ER16|Y
01|180338|2|1|Optional but recommended*|Y
01|180338|6|1|Optional but recommended*|Y
01|180338|7|1|Optional but recommended*|Y
01|180350|9|1|Alternative for 5 GL|Y
01|180358|1|1|RGA#LVR-58376/|Y
01|180358|1|2|Repair of MNL12-ER40X-ICE-10K s/n:19903165 01|Y
01|180358|1|3|(Mimatic#187708)|Y
01|180358|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|180358|2|2|1 spindle.|Y
01|180359|6|1|3pc stk IL|Y
01|180359|6|2|4th pc - 2-3wks|Y
01|180359|6|3|Balance - 5-6wks|Y
01|180359|10|1|1pc stk IL|Y
01|180359|10|2|2nd pc - 2-3wks|Y
01|180359|10|3|Balance - 7-8wks|Y
01|180368|4|1|Please Note: If this is the holder the customer chooses|Y
01|180368|4|2|Lyndex-nikken will not be able to provide a case.|Y
01|180381|1|1|B4001-1000-1.75CP-DIN-M|Y
01|180381|1|2|0|N
01|180381|3|1|B4001-0750-1.75CP-DIN-M|Y
01|180381|5|1|BT40-C1F-70-M|Y
01|180381|9|1|BT40-C3/4F-70-M|Y
01|180381|16|1|BT40-SK10F-90-M|Y
01|180381|21|1|B4007-0011-4.00-DIN-M|Y
01|180381|23|1|BT40-ER16-100-DIN-M|Y
01|180381|25|1|BT40-ER32-100-DIN-M|Y
01|180394|1|1|Balance of 1 pcs ETA 7-9 Weeks|Y
01|180395|8|1|PLEASE NOTE: SE1-3.0X2.5 is a non-stock tool. Once an|Y
01|180395|8|2|order is placed it cannot be cancelled or returned.|Y
01|180395|8|3|Stock @ Italy AIR shipmetn is about to leave Italy.|Y
01|180395|8|4|If you miss this AIR shipment next AIR CUT 7/Beg for|Y
01|180395|8|5|ETA 7/Mid.|Y
01|180415|14|1|Includes: Travel/Labor Time Food/Hotel/Gas and Other|Y
01|180415|14|2|Expenses.(Travel 2days 1day Labor)|Y
01|180415|14|3|Yas Saeki(L-N Sales Rep)will provide on-site Setup and|Y
01|180415|14|4|Training.|Y
01|180442|1|1|HSK100A; ER32 AGH; A=80mm; L=600mm;|Y
01|180442|1|2|4x90deg indexing positioning; NO COOLANT;|Y
01|180442|1|3|1:1 gEAR MAX 70Nm; 6500 RPM;|Y
01|180442|1|4|weight approx 40kg|Y
01|180442|2|1|HSK100A; ER32 AGH; A=80mm; L=600mm;|Y
01|180442|2|2|4x90deg indexing positioning; NO COOLANT;|Y
01|180442|2|3|1:1 gEAR MAX 70Nm; 6500 RPM;|Y
01|180442|2|4|weight approx 40kg|Y
01|180449|4|1|Quoted at NET price.|Y
01|180477|4|1|TCE-A7088 Power cable for CNC202LFA|Y
01|180477|5|1|TCE-96743 Feedback cable for CNC202LFA|Y
01|180477|9|1|*Base plate by aluminum was supplied from the customer|Y
01|180477|9|2|last time|Y
01|180478|1|1|Completed RAH Form required for PO acceptance.|Y
01|180482|1|1|HW-10C-COL w/A2-8 adaptor HOWA # H05M10A8Lyndex part#|Y
01|180482|1|2|to be determined.|Y
01|180482|1|3|NET EA Price ETA approx middle of October if order is|Y
01|180482|1|4|placed by End of July. Item is a special Non cancelable|Y
01|180482|1|5|& non returnable once order is placed.Drawing approval|Y
01|180482|1|6|will need to be sighed.|Y
01|180498|1|1|5AX-350FA-M SN: 3520|Y
01|180498|1|2|TAR-58408|Y
01|180498|3|1|COMPLETE REPLACEMENT CASTING + NEW INTERNAL PARTS|Y
01|180498|3|2|CASTING DAMAGE ON TILT AXIS - NEED REPLACE ENTIRE|Y
01|180498|3|3|HOUSING|Y
01|180514|1|1|1st Batch(w/ScrewOnKey)|Y
01|180514|2|1|1st Batch(w/ScrewOnKey)|Y
01|180514|3|1|1st Batch|Y
01|180514|4|1|Req.INS:Need to check dual contact tolerance.|Y
01|180514|5|1|Req.INS:Need to check dual contact tolerance.|Y
01|180518|3|1|includes external cables|Y
01|180518|4|1|2 riser to bring center height to 230mm|Y
01|180524|1|1|Speial item not cancelable nor returnable once an|Y
01|180524|1|2|order is placed|Y
01|180529|4|1|Price included Pull stud part # PS-123E|Y
01|180534|1|1|HSK40A-FMC22-100|Y
01|180534|1|2|HSK40A Shell/Face Mill Holder 22mm|Y
01|180537|12|1|NO ID THREADS|Y
01|180539|1|1|NCS-11.0|Y
01|180539|1|2|NC Sensor Reamer ST Shank 11.0mm|Y
01|180545|1|1|Net price includes the following parts for assembly|Y
01|180545|1|2|at Lyndex-Nikken: HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|180545|1|3|customer's supplied RFID chip and holder re-balanced.|Y
01|180545|2|1|Customer providing balluf chip to be installed on|Y
01|180545|2|2|holder and balanced included in price of toolholder.|Y
01|180545|3|1|HS coolant nut installed included in price of|Y
01|180545|3|2|toolholder.|Y
01|180545|4|1|Coolant back-up screw and coolant tube installed|Y
01|180545|4|2|included in price of toolholder.|Y
01|180545|6|1|Net price includes the following parts for assembly|Y
01|180545|6|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|180545|6|3|customer's supplied RFID chip and holder re-balanced.|Y
01|180545|7|1|Customer providing balluf chip to be installed on|Y
01|180545|7|2|holder and balanced included in price of toolholder.|Y
01|180545|8|1|HS coolant nut installed included in price of|Y
01|180545|8|2|toolholder.|Y
01|180545|9|1|Coolant back-up screw and coolant tube installed|Y
01|180545|9|2|included in price of toolholder.|Y
01|180545|11|1|Net price includes the following parts for assembly|Y
01|180545|11|2|at Lyndex-Nikken: HSK63-Tube SKN-25BJ(GH)|Y
01|180545|11|3|SKG25-18HGE-J customer's supplied RFID chip and|Y
01|180545|11|4|holder re-balanced.|Y
01|180545|12|1|Customer providing balluf chip to be installed on|Y
01|180545|12|2|holder and balanced included in price of toolholder.|Y
01|180545|13|1|HS coolant nut installed included in price of|Y
01|180545|13|2|toolholder.|Y
01|180545|14|1|Coolant back-up screw and coolant tube installed|Y
01|180545|14|2|included in price of toolholder.|Y
01|180551|1|1|HSK100A Shell/Face Mill Holder 60mm w/ 75mm GL|Y
01|180551|1|2|part# TBD|Y
01|180551|1|3|**Net Pricing based on 30pc MIN.|Y
01|180565|3|1|This item is quoted at NET price.|Y
01|180568|1|1|delivery is extended due to needle bearing is not|Y
01|180568|1|2|available at this time.|Y
01|180573|13|1|MOQ: 50  Special Order Item.|Y
01|180575|11|1|H63A-SF4-120 HSK63A Shrink Fit Holder 4mm|Y
01|180582|15|1|Sub for BT30-MX06-090|Y
01|180585|1|1|RGA#LVR-58428/|Y
01|180585|1|2|Repair of OKU-L370MW-SU (Alps#A505-2556)|Y
01|180585|2|1|Bearings o-rings collet nut and spindle to be|Y
01|180585|2|2|replaced. If spindle can be reused the cost will be|Y
01|180585|2|3|$1887.60|Y
01|180585|4|1|Repair of OKU-L370MW-DB|Y
01|180585|5|1|Bearings o-rings collet nut and spindle to be|Y
01|180585|5|2|replaced. If spindle can be reused the cost will be|Y
01|180585|5|3|$3180.40|Y
01|180592|1|1|Please Note; We will plug the DIN holes at|Y
01|180592|1|2|Lyndex-Nikken.|Y
01|180601|1|1|Est Dim&WT:12x9x5(in)/GW:1.5LBS|Y
01|180601|1|2|Est UPS FRT cost:$206~278|Y
01|180601|1|3|Currency in USD|Y
01|180605|1|1|RGA#LVR-58435/|Y
01|180605|1|2|Repair of OKEX-ER32Z  s/n:AL0182 (Alps#OKA00-20000)|Y
01|180605|2|1|Bearings o-rings collet nut and spindle to be|Y
01|180605|2|2|replaced. If spindle can be reused the cost will be|Y
01|180605|2|3|$1617.20|Y
01|180621|1|1|PLEASE NOTE: MPK4-2.5  is a non-stock tool. Once an|Y
01|180621|1|2|order is placed it cannot be cancelled or returned.|Y
01|180623|2|1|This block may change based on customer completing the|Y
01|180623|2|2|questionnaire.|Y
01|180623|2|3|NET EA PRICE|Y
01|180652|1|1|P/N: MZL60-ER32(X)-SP|Y
01|180652|1|2|Mori Live ER32 X-Axis STRT U-Shape Special|Y
01|180652|1|3|BMT110; L=725mm; L1=614mm; 1:1 Gear Max 20Nm; 6000 RPM|Y
01|180652|1|4|INTERNAL COOLANT THROUGH SPINDLE|Y
01|180652|1|5|Ref Drwg#00040189|Y
01|180652|1|6|#176581|Y
01|180668|1|1|5AX-350|Y
01|180668|1|2|SN:3513|Y
01|180668|1|3|RGA#TAR-58408|Y
01|180668|33|1|CHROME PLATE/RE-GRIND|Y
01|180672|1|1|Please note: Reference Q#180667 for tool list|Y
01|180674|1|1|Please note: Refer to Q# 180671 for tool list|Y
01|180675|1|1|JPY290000/net ea($1=JPY100)|Y
01|180675|2|1|JPY45800/net ea($1=JPY100)|Y
01|180682|1|1|P/N: MNZ20-SK16Y-MD-ICE|Y
01|180682|1|2|Mori Live SK16 Dual Y-Axis; INT/EXT Coolant - ICE|Y
01|180682|1|3|1:1 Gear Max; 20Nm PER SPINDLE; 8000RPM|Y
01|180682|1|4|Ref# 00056567|Y
01|180682|2|1|Same as above|Y
01|180682|3|1|Same as above|Y
01|180682|4|1|Same as above|Y
01|180682|5|1|Same as above|Y
01|180682|7|1|P/N: MNZ20-SK20Y-MD-ICE|Y
01|180682|7|2|Mori Live SK20 Dual Y-Axis INT/EXT COOLANT - ICE|Y
01|180682|7|3|1:1 Gear Max; 20Nm PER SPINDLE; 8000RPM|Y
01|180682|7|4|Ref#00056567|Y
01|180682|8|1|Same as above|Y
01|180682|9|1|Same as above|Y
01|180682|10|1|Same as above|Y
01|180682|11|1|Same as above|Y
01|180686|1|1|RGA#LVR-58448/|Y
01|180686|1|2|Repair of BMT65-ER32Z-MS s/n: 2090523907|Y
01|180686|1|3|(Mimatic#186493)|Y
01|180686|2|1|Bearings seals and o-rings to be replaced.|Y
01|180692|1|1|CAT40-ER16-4.00BN|Y
01|180692|1|2|CAT40 ER16 Collet Chuck HighTorque Bearing Nut|Y
01|180721|1|1|RGA#TOR-58385/|Y
01|180721|1|2|Repair of 1 x CAT50-C1.1/4-105U-IDU|Y
01|180723|1|1|BT30-SZF6-90-J|Y
01|180723|1|2|BT30 Zero Fit Slim Chuck SK6 15000rpm w/ J-Nut|Y
01|180724|1|1|HSK63A-MDSK20-90-J|Y
01|180724|1|2|HSK63A SK20 Major Dream 15000rpm w/ J-nut(MDSKN-20BJ)|Y
01|180725|15|1|For E236PLUS|Y
01|180725|16|1|For E346PLUS|Y
01|180728|1|1|Req.INS:Need to check dual contact tolerance.|Y
01|180728|2|1|Req.INS:Need to check dual contact tolerance.|Y
01|180728|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|180728|4|1|1st Batch|Y
01|180728|5|1|1st Batch|Y
01|180728|6|1|Req.INS:Need to check dual contact tolerance.|Y
01|180735|1|1|PLEASE NOTE: K32-SK16-150 is a non stock tool. Once an|Y
01|180735|1|2|order is placed it cannot be cancelled or returned.|Y
01|180783|1|1|CAT40-FMH32-96-60U-IDU|Y
01|180783|1|2|CAT40 Shell/Face Mill Holder 32mm|Y
01|180783|1|3|Slotter: TRGSM32I040-16-00|Y
01|180783|1|4|Special Order Item.|Y
01|180787|2|1|in stock substitute|Y
01|180794|1|1|1st Batch 4/16/20:DWG Approved/AR|Y
01|180794|2|1|For stock 12/14/18: DWG Approved (9)8/30B 1st Batch|Y
01|180804|3|1|Installation includes: Dual axis drive bulkhead cables|Y
01|180804|3|2|external cables parmeter changes service time and|Y
01|180804|3|3|travel.|Y
01|180804|3|4|Fanuc software option and ladder must be present.|Y
01|180815|1|1|RGA#TOR-58440/|Y
01|180815|1|2|Repair of CAT40-NPU8-80U-IDU|Y
01|180824|1|1|RGA#TOR-58429/|Y
01|180824|1|2|Repair of CAT40-NPU13-105U-IDU|Y
01|180826|2|1|ANSI standard option. Refer to drawings|Y
01|180826|6|1|Required wrench if customer does not already have one|Y
01|180846|1|1|14.910.0.029.0 - OD 1 STICK TOOL HOLDER|Y
01|180846|2|1|14.910.0.0208.0 - 1.5 BORING BAR HOLDER|Y
01|180846|3|1|14.101.0.0270.0 - RADIAL/CROSS TOOL ER32 EC|Y
01|180846|4|1|14.800.0.0379.0 - AXIAL/FACE TOOL ER32 EC|Y
01|180853|1|1|UNV_524|Y
01|180853|1|2|8 pcs - $252.00 net ea.|Y
01|180853|1|3|12 pcs - $234.00 net ea.|Y
01|180853|1|4|24 pcs - $210.00 net ea.|Y
01|180863|3|1|Special - non-cancelable/non-returnable after ARO|Y
01|180880|1|1|RGA#LVR-58463/|Y
01|180880|1|2|Repair of MNL12-ER25X-OFF-HS-ICE s/n:88533 03|Y
01|180880|1|3|(Mimatic#189424)|Y
01|180880|2|1|Bearings seals o-rings and damaged output spindle to|Y
01|180880|2|2|be replaced.|Y
01|180893|1|1|No INS Req'd. Part of Cheersun AIR#06202201A|Y
01|180908|1|1|Replacment for Butler PO: 6873152 / RGA: QUA-58524|Y
01|180915|1|1|C6-ER16-100 Polygon C6 ER16 Collet Chuck Holder w/ID|Y
01|180915|1|2|Chip Hole and E16-NUT-S installed.|Y
01|180915|1|3|Quoted at NET price.|Y
01|180915|2|1|C6-ER20-100 Polygon C6 ER20 Collet Chuck Holder w/ID|Y
01|180915|2|2|Chip Hole and E20-NUT-S installed.|Y
01|180915|2|3|Quoted at NET price.|Y
01|180915|3|1|C6-ER32-100 Polygon C6 ER32 Collet Chuck Holder w/ID|Y
01|180915|3|2|Chip Hole and E32-NUT-S installed.|Y
01|180915|3|3|Quoted at NET price.|Y
01|180915|5|1|C4-ER16-70 Polygon C4 ER16 Collet Chuck Holder|Y
01|180915|5|2|with E16-NUT-S installed.|Y
01|180915|5|3|Quoted at NET price.|Y
01|180915|6|1|C4-ER20-52 Polygon C4 ER20 Collet Chuck Holder|Y
01|180915|6|2|with E20-NUT-S installed.|Y
01|180915|6|3|Quoted at NET price.|Y
01|180915|7|1|C4-ER32-54 Polygon C4 ER32 Collet Chuck Holder|Y
01|180915|7|2|with E32-NUT-S installed.|Y
01|180915|7|3|Quoted at NET price.|Y
01|180916|1|1|INS Req'd:Give 1p to SVC|Y
01|180916|2|1|INS Req'd:Give 1p to SVC|Y
01|180916|3|1|INS Req'd:Give 1p to SVC|Y
01|180916|4|1|INS Req'd:Give 1p to SVC|Y
01|180916|5|1|INS Req'd:Give 1p to SVC|Y
01|180916|6|1|INS Req'd:Give 1p to SVC|Y
01|180916|7|1|INS Req'd:Give 1p to SVC|Y
01|180916|8|1|INS Req'd:Give 1p to SVC|Y
01|180924|1|1|**Min 25pc required|Y
01|180924|2|1|50-99pc pricing|Y
01|180924|3|1|100+pc pricing|Y
01|180924|3|2|part# HSK100A-BLANK4.5x14.00|Y
01|180924|3|3|HSK100A Blank Bar 4.5 OD x 14 GL|Y
01|180924|3|4|through hardened 40-45 HRC|Y
01|180924|5|1|**Min 25pc required|Y
01|180924|6|1|50-99pc pricing|Y
01|180924|7|1|100+pc pricing|Y
01|180924|7|2|part# HSK100A-BLANK6.0x10.00|Y
01|180924|7|3|HSK100A Blank Bar 6.0 OD x 10 GL|Y
01|180924|7|4|through hardened 40-45 HRC|Y
01|180924|9|1|**Min 25pc required|Y
01|180924|10|1|50-99pc pricing|Y
01|180924|11|1|100+pc pricing|Y
01|180924|11|2|part# CAT50-BLANK4.5x14.00|Y
01|180924|11|3|CAT50 Blank Bar 4.5 OD x 14 GL|Y
01|180924|11|4|through hardened 40-45 HRC|Y
01|180924|13|1|**Min 25pc required|Y
01|180924|14|1|50-99pc pricing|Y
01|180924|15|1|100+pc pricing|Y
01|180924|15|2|part# CAT50-BLANK6.0x10.00|Y
01|180924|15|3|CAT50 Blank Bar 6.0 OD x 10 GL|Y
01|180924|15|4|through hardened 40-45 HRC|Y
01|180924|17|1|**Min 25pc required|Y
01|180924|18|1|50-99pc pricing|Y
01|180924|19|1|100+pc pricing|Y
01|180924|19|2|part# NCAT50-BLANK4.5x14.00|Y
01|180924|19|3|NCAT50 Dual Contact Blank Bar 4.5 OD x 14 GL|Y
01|180924|19|4|through hardened 40-45 HRC|Y
01|180924|21|1|**Min 25pc required|Y
01|180924|22|1|50-99pc pricing|Y
01|180924|23|1|100+pc pricing|Y
01|180924|23|2|part# NCAT50-BLANK6.0x10.00|Y
01|180924|23|3|NCAT50 Dual Contact Blank Bar 6.0 OD x 10 GL|Y
01|180924|23|4|through hardened 40-45 HRC|Y
01|180925|2|1|#4 Retainer for H063M6|Y
01|180925|3|1|#13 Dust seal for H063M6|Y
01|180927|4|1|CREDIT CARD ORDER ONLY|Y
01|180932|2|1|Live tool requires 2 wrenches|Y
01|180943|9|1|TOOL TRACKING SOFTWARE|Y
01|180947|2|1|#4 Retainer for H063M6|Y
01|180947|3|1|#13 Dust seal for H063M6|Y
01|180955|1|1|1st Batch|Y
01|180955|2|1|1st Batch|Y
01|180956|1|1|This item is considered speical once ordered it cannot|Y
01|180956|1|2|be cancelled or returned.|Y
01|180956|5|1|This item is considered speical once ordered it cannot|Y
01|180956|5|2|cancelled or returned.|Y
01|180958|1|1|INCLUDES TP32 WITH 8 LICENSES.|Y
01|180971|7|1|STOCK ALTERNATIVE TO ABOVE|Y
01|180973|1|1|MCAT50-C3/4-165U MCAT50 3/4 Milling Chuck|Y
01|180973|1|2|Three Lock Holder. Please note this tool can only be|Y
01|180973|1|3|used in a dual contact spindle.|Y
01|180976|1|1|SN: 25049T CNC202FA-M|Y
01|180976|1|2|RGA#TAR-57996|Y
01|180976|19|1|SN:22580B TAT-170|Y
01|180976|19|2|RGA#TAR-57996|Y
01|180979|1|1|For stock 12/14/18: DWG Approved (9)8/30B 1st Batch|Y
01|180990|1|1|SN:25049T CNC202FA-M|Y
01|180990|1|2|RGA#TAR-57996|Y
01|180990|25|1|SN:22580B TAT-170|Y
01|180994|1|1|Service call charge for 1st day|Y
01|180994|1|2|Includes: Travel/Labor Time Food/Hotel/Gas and Other|Y
01|180994|1|3|Expenses|Y
01|180994|2|1|Service call charge for 2nd day and after|Y
01|180994|3|1|Estimate the parts cost for repair|Y
01|180995|1|1|PLEASE NOTE: ZK38-1.1/8U is a non-stock tool. Once an|Y
01|180995|1|2|order is placed it cannot be cancelled or returned.|Y
01|181052|1|1|Parts#: 160-066|Y
01|181052|1|2|16C Round Collet 1.1/32 (SP ID)|Y
01|181052|1|3|Special Order Item.|Y
01|181058|1|1|This item is considered special one ordered cannot be|Y
01|181058|1|2|cancelled or returned.|Y
01|181058|2|1|This item is considered special one ordered cannot be|Y
01|181058|2|2|cancelled or returned.|Y
01|181058|3|1|This item is considered special one ordered cannot be|Y
01|181058|3|2|cancelled or returned.|Y
01|181058|4|1|Please order new part # C4001-1000-1.75CP-DIN-M|Y
01|181058|4|2|This item is considered special one ordered cannot be|Y
01|181058|4|3|cancelled or returned.|Y
01|181058|5|1|This item is considered special one ordered cannot be|Y
01|181058|5|2|cancelled or returned.|Y
01|181058|6|1|This item is considered special one ordered cannot be|Y
01|181058|6|2|cancelled or returned|Y
01|181058|7|1|This item is considered special one ordered cannot be|Y
01|181058|7|2|cancelled or returned.|Y
01|181058|10|1|Listed twice on list. Added both here.|Y
01|181068|1|1|This is non-standard stock item and considered special.|Y
01|181068|1|2|Once a PO has been issued it cannot be cancelled|Y
01|181068|1|3|or returned.|Y
01|181081|1|1|1st Batch|Y
01|181118|4|1|Upon receipt of spindle drawing|Y
01|181133|24|1|to hold .767|Y
01|181133|25|1|to hold 1.000|Y
01|181133|28|1|recommend per HSK100A holder|Y
01|181142|1|1|Option #1: Dead-Length Style Chuck|Y
01|181142|3|1|Option #2: Pull-Back Style Chuck|Y
01|181142|5|1|x1 Required for each chuck|Y
01|181142|7|1|Option #2: Pull-Back Style Chuck|Y
01|181151|1|1|P/N: MNZ20-CAPTO4X-ICE-12K|Y
01|181151|1|2|Mori Live Capto 4 X-Axis STRT<Radial>|Y
01|181151|1|3|INTERNAL EXTERNAL Coolant 7MP|Y
01|181151|1|4|MIM 199418|Y
01|181151|2|1|P/N: MNZ20-CAPTO4Z-ICE-12K-85|Y
01|181151|2|2|Mori Live CAPTO4 Z-Axis 90DEG<Axial>|Y
01|181151|2|3|INTERNAL EXTERNAL Coolant 7MP|Y
01|181151|2|4|Mim 199419|Y
01|181151|5|1|P/N: MNZ20-ER25Z-MD-85|Y
01|181151|5|2|Mori Live ER25 Z-Axis<Axial> MainDual EXTERNAL Coolant|Y
01|181151|5|3|Mim 201170|Y
01|181151|6|1|SAME TOOL AS ABOVE|Y
01|181151|10|1|SAME TOOL AS ABOVE|Y
01|181157|1|1|PLEASE NOTE: KM42-1.1/4 is a non stock tool. Once an|Y
01|181157|1|2|order is placed it cannot be cancelled or returned.|Y
01|181160|1|1|PLEASE NOTE: KM42-1.1/4 is a non stock tool. Once an|Y
01|181160|1|2|order is placed it cannot be cancelled or returned.|Y
01|181162|1|1|erice for 4-9pcs|Y
01|181162|1|2|Non cancellable and Non returnable after receiving PO|Y
01|181162|2|1|Price for 10+pcs|Y
01|181162|2|2|Non cancellable and Non returnable after receiving PO|Y
01|181162|4|1|HSK63A-SF16-80CP|Y
01|181162|4|2|Price for 1pc|Y
01|181162|4|3|on cancellable and Non returnable after receiving PO|Y
01|181162|5|1|HSK63A-SF16-80CP|Y
01|181162|5|2|Price for 10+|Y
01|181162|5|3|on cancellable and Non returnable after receiving PO|Y
01|181162|7|1|NBT30-SK16C-75-J|Y
01|181162|10|1|HSK63A-SK16-80-J|Y
01|181182|3|1|BT30-SK13-60|Y
01|181190|11|1|wrench for the C1.1/4 Mill chuck|Y
01|181192|1|1|NCAT50-SF0187-3.15CP NCAT50 Dual Contact Shrink Fit|Y
01|181192|1|2|Holder 3/16 with Coolant Ports|Y
01|181192|1|3|DELIVERY: 13 Weeks / Summer break 7/30~8/16|Y
01|181192|5|1|DELIVERY: 13 Weeks / Summer break 7/30~8/16|Y
01|181192|6|1|NCAT50-SF0562-3.15CP NCAT50 Dual Contact Shrink Fit|Y
01|181192|6|2|Holder 9/16 Coolant Ports|Y
01|181192|6|3|DELIVERY: 13 Weeks / Summer break 7/30~8/16|Y
01|181192|13|1|CAT50-SF0187-3.15CP CAT50 Shrink Fit Holder 3/16|Y
01|181192|13|2|with coolant ports.|Y
01|181192|13|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181192|13|4|Please Note: CAT50-SF0187-3.15CP is a non stock tool.|Y
01|181192|13|5|Once an order is placed it cannot be cancelled or|Y
01|181192|13|6|returned.|Y
01|181192|13|7|Quoted price is for 1~9 tools.|Y
01|181192|14|1|CAT50-SF0187-3.15CP >> CAT50 Shrink Fit Holder 3/16|Y
01|181192|14|2|with coolant ports.|Y
01|181192|14|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181192|14|4|Please Note: CAT50-SF0187-3.15CP is a non stock tool.|Y
01|181192|14|5|Once an order is placed it cannot be cancelled or|Y
01|181192|14|6|returned.|Y
01|181192|14|7|Quoted price is for 10+ tools.|Y
01|181192|18|1|CAT50-SF0312-3.15CP  CAT50 Shrink Fit Holder 5/16|Y
01|181192|18|2|with coolant ports.|Y
01|181192|18|3|Delivery Estimated at 13 Weeks /7/30~8/16 Mfg Closed|Y
01|181192|18|4|Please Note: CAT50-SF0312-3.15CP is a non stock tool.|Y
01|181192|18|5|Once an order is placed it cannot be cancelled or|Y
01|181192|18|6|returned.|Y
01|181192|18|7|Quoted price is for 1~9 tools.|Y
01|181192|19|1|CAT50-SF0312-3.15CP  CAT50 Shrink Fit Holder 5/16|Y
01|181192|19|2|with coolant ports.|Y
01|181192|19|3|Delivery Estimated at 13 Weeks/7/30~8/16 Mfg Closed|Y
01|181192|19|4|Please Note: CAT50-SF0312-3.15CP is a non stock tool.|Y
01|181192|19|5|Once a purchase order is placed it cannot be cancelled|Y
01|181192|19|6|or returned.|Y
01|181192|19|7|Quoted price is for 10+ tools.|Y
01|181192|21|1|CAT50-SF0437-3.15CP >> CAT50 Shrink Fit Holder 7/16|Y
01|181192|21|2|with coolant ports.|Y
01|181192|21|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181192|21|4|Please Note: CAT50-SF0437-3.15CP is a non stock tool.|Y
01|181192|21|5|Once a purchase order is placed it cannot be cancelled|Y
01|181192|21|6|or returned.|Y
01|181192|21|7|Quoted price is for 1~9 tools.|Y
01|181192|22|1|CAT50-SF0437-3.15CP >> CAT50 Shrink Fit Holder 7/16|Y
01|181192|22|2|with coolant ports.|Y
01|181192|22|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181192|22|4|Please Note: CAT50-SF0437-3.15CP is a non stock tool.|Y
01|181192|22|5|Once a purchase order is placed it cannot be cancelled|Y
01|181192|22|6|or returned.|Y
01|181192|22|7|Quoted price is for 10+ tools.|Y
01|181192|26|1|CAT50-SF0562-3.15CP CAT50 Shrink Fit Holder 9/16|Y
01|181192|26|2|coolant ports.|Y
01|181192|26|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181192|26|4|Please Note: CAT50-SF0562-3.15CP is a non stock tool.|Y
01|181192|26|5|Once an order is placed it cannot be cancelled or|Y
01|181192|26|6|returned.|Y
01|181192|26|7|Quoted price is for 1~9 tools.|Y
01|181192|27|1|CAT50-SF0562-3.15CP >> CAT50 Shrink Fit Holder 9/16|Y
01|181192|27|2|with coolant ports.|Y
01|181192|27|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181192|27|4|Please Note: Please Note: CAT50-SF0562-3.15CP is a|Y
01|181192|27|5|non standard stock item. Once a purchase order is|Y
01|181192|27|6|placed it cannot be cancelled or returned.|Y
01|181192|27|7|Quoted price is for 10+ tools.|Y
01|181192|29|1|CAT50-SF0312-3.15CP  CAT50 Shrink Fit Holder 5/16|Y
01|181192|29|2|with coolant ports.|Y
01|181192|30|1|CAT50-SF0437-3.15CP CAT50 Shrink Fit Holder 7/16|Y
01|181192|30|2|with coolant ports.|Y
01|181192|32|1|CAT50-SF0187-3.15CP CAT50 Shrink Fit Holder 7/16|Y
01|181192|32|2|with coolant ports.|Y
01|181197|6|1|SPECIAL; NON-RETURNABLE/NON-CANCELLABLE|Y
01|181197|7|1|SPECIAL; NON-RETURNABLE/NON-CANCELLABLE|Y
01|181197|8|1|SPECIAL; NON-RETURNABLE/NON-CANCELLABLE|Y
01|181197|21|1|ALL AVAILABLE EXCEPT 8MM WHICH IS DUE MID JULY|Y
01|181197|22|1|ALL AVAILABLE EXCEPT 3/16 WHICH IS DUE MID JUNE|Y
01|181203|1|1|B4017-0032-5.00 with Solid Nut Installed|Y
01|181225|1|1|Install 4th Axis Interface on 2nd Doosan|Y
01|181230|17|1|SKJ25-15|Y
01|181230|17|2|SK20/SK25 Coolant Cap 15.0mm Jet Slots|Y
01|181230|18|1|SKJ25-15C|Y
01|181230|18|2|SK20/SK25 Coolant Cap 15.0mm|Y
01|181232|1|1|1st Batch/For stock 6/23/21:DWG Approved/BT|Y
01|181265|1|1|CAT50-SF0187-3.15CP >> CAT50 Shrink Fit Holder 3/16|Y
01|181265|1|2|with coolant ports.|Y
01|181265|1|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181265|1|4|Please Note: CAT50-SF0187-3.15CP is a non stock tool.|Y
01|181265|1|5|Once an order is placed it cannot be cancelled or|Y
01|181265|1|6|returned.|Y
01|181265|1|7|Quoted price is for 1~9 tools.|Y
01|181265|2|1|CAT50-SF0187-3.15CP >> CAT50 Shrink Fit Holder 3/16|Y
01|181265|2|2|with coolant ports.|Y
01|181265|2|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181265|2|4|Please Note: CAT50-SF0187-3.15CP is a non stock tool.|Y
01|181265|2|5|Once an order is placed it cannot be cancelled or|Y
01|181265|2|6|returned.|Y
01|181265|2|7|Quoted price is for 10+ tools.|Y
01|181265|6|1|CAT50-SF0312-3.15CP >>  CAT50 Shrink Fit Holder 5/16|Y
01|181265|6|2|with coolant ports.|Y
01|181265|6|3|Delivery Estimated at 13 Weeks /7/30~8/16 Mfg Closed|Y
01|181265|6|4|Please Note: CAT50-SF0312-3.15CP is a non stock tool.|Y
01|181265|6|5|Once an order is placed it cannot be cancelled or|Y
01|181265|6|6|returned.|Y
01|181265|6|7|Quoted price is for 1~9 tools.|Y
01|181265|7|1|CAT50-SF0312-3.15CP >>  CAT50 Shrink Fit Holder 5/16|Y
01|181265|7|2|with coolant ports.|Y
01|181265|7|3|Delivery Estimated at 13 Weeks /7/30~8/16 Mfg Closed|Y
01|181265|7|4|Please Note: CAT50-SF0312-3.15CP is a non stock tool.|Y
01|181265|7|5|Once a purchase order is placed it cannot be cancelled|Y
01|181265|7|6|or returned.|Y
01|181265|7|7|Quoted price is for 10+ tools.|Y
01|181265|9|1|CAT50-SF0437-3.15CP >> CAT50 Shrink Fit Holder 7/16|Y
01|181265|9|2|with coolant ports.|Y
01|181265|9|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181265|9|4|PLEASE NOTE: CAT50-SF0437-3.15CP is a non stock tool.|Y
01|181265|9|5|Once an order is placed it cannot be cancelled or|Y
01|181265|9|6|returned.|Y
01|181265|9|7|Quoted price is for 1~9 tools.|Y
01|181265|10|1|CAT50-SF0437-3.15CP >> CAT50 Shrink Fit Holder 7/16|Y
01|181265|10|2|with coolant ports.|Y
01|181265|10|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181265|10|4|PLEASE NOTE: CAT50-SF0437-3.15CP is a non stock tool.|Y
01|181265|10|5|Once a purchase order is placed it cannot be cancelled|Y
01|181265|10|6|or returned.|Y
01|181265|10|7|Quoted price is for 10+ tools.|Y
01|181265|14|1|CAT50-SF0562-3.15CP >> CAT50 Shrink Fit Holder 9/16|Y
01|181265|14|2|coolant ports.|Y
01|181265|14|3|Delivery: 13 Weeks / Summer break 7/30~8/16 Mfg Closed|Y
01|181265|14|4|Please Note: CAT50-SF0562-3.15CP is a non stock tool.|Y
01|181265|14|5|Once an order is placed it cannot be cancelled or|Y
01|181265|14|6|returned.|Y
01|181265|14|7|Quoted price is for 1~9 tools.|Y
01|181268|5|1|This item is considered special once orderd it cannot|Y
01|181268|5|2|be cancelled or returned.|Y
01|181269|1|1|Special one time price.|Y
01|181269|2|1|special one time price|Y
01|181269|3|1|Includes: Upgraded drive unit and power cable.|Y
01|181273|1|1|Parts#: 160-066|Y
01|181273|1|2|16C Round Collet 1.1/32 (SP ID)|Y
01|181273|1|3|Special Order Item.|Y
01|181273|1|4|Minimum Order Qty. 3pcs|Y
01|181297|28|1|These are in stock|Y
01|181298|5|1|Substitute for CAT40-SF0125-3.15 and can be taken at|Y
01|181298|5|2|100% discount.|Y
01|181299|1|1|BT50-MMC12C-105AA|Y
01|181299|1|2|BT50 12mm 2Lock Mini-Mini Chuck Coolant 20000rpm G2.5|Y
01|181299|1|3|Advanced Alpha Side Lock Type.|Y
01|181300|1|1|S.EMACP6200-W85200|Y
01|181300|1|2|eMACP-W Boring Head Set. Not included Base holder and|Y
01|181300|1|3|Inserts.|Y
01|181317|1|1|On Quote file|Y
01|181319|1|1|HSK63A(80) Reamer Adapter per specs provided by Orizon|Y
01|181320|1|1|RGA#TOR-58505/|Y
01|181320|1|2|Repair of CAT40-NPU13-105U-IDU|Y
01|181324|1|1|PLEASE NOTE: HA50-T45 is a non-stock tool. Once an|Y
01|181324|1|2|order is placed it cannot be cancelled or returned.|Y
01|181324|2|1|Last 1pc in Stk >> Delivery 1-2wks ARO|Y
01|181324|2|2|New production delivery >> 19wks ARO|Y
01|181324|2|3|PLEASE NOTE: HM5T-T35 is a non-stock tool. Once an|Y
01|181324|2|4|order is placed it cannot be cancelled or returned.|Y
01|181324|3|1|PLEASE NOTE: TT35-MT2 is a non-stock tool. Once an|Y
01|181324|3|2|order is placed it cannot be cancelled or returned.|Y
01|181324|4|1|PLEASE NOTE: TT35-MT3 is a non-stock tool. Once an|Y
01|181324|4|2|order is placed it cannot be cancelled or returned.|Y
01|181324|5|1|PLEASE NOTE: TT45-MT4 is a non-stock tool. Once an|Y
01|181324|5|2|order is placed it cannot be cancelled or returned.|Y
01|181329|8|1|Alternative for 15 and 12 projection|Y
01|181329|10|1|Alternative for 9 projection|Y
01|181331|1|1|Bring in standard and convert here|Y
01|181334|2|1|Please Note: These toolholders are non standard stock.|Y
01|181334|2|2|Once a purchase order is placed it cannot be cancelled|Y
01|181334|2|3|or returned.|Y
01|181334|14|1|Please Note: These toolholders are non standard stock.|Y
01|181334|14|2|Once a purchase order is placed it cannot be cancelled|Y
01|181334|14|3|or returned.|Y
01|181342|1|1|Tables are in stock but will need to order motors and|Y
01|181342|1|2|make wiring harnesses.  Will configure to match table|Y
01|181342|1|3|that is currently in for repair per customer request.|Y
01|181355|1|1|Repeat application.FP will forward spindle drawing etc|Y
01|181355|1|2|and communicate with Tim R|Y
01|181355|8|1|NET ea price no additional discount.We will need|Y
01|181355|8|2|dimensions before block can be shipped|Y
01|181397|1|1|Special table for HPPG without motor|Y
01|181397|1|2|Ref S#6541|Y
01|181397|2|1|TCD-79029/0|Y
01|181397|2|2|10+1 Rotary joint|Y
01|181417|1|1|This is non-standard stock item and considered special.|Y
01|181417|1|2|Once a PO has been issued it cannot be cancelled|Y
01|181417|1|3|or returned.|Y
01|181421|1|1|BMT65-ER25-AD-ICE >> BMT65 ER25 Adjustable Live Tool|Y
01|181421|1|2|with ICE/Internal/External Coolant and can be run dry.|Y
01|181424|1|1|NBT30-C16-70|Y
01|181424|5|1|NBT30-HC3-90 (NO QUOTE)|Y
01|181424|6|1|NBT30-HC6-75|Y
01|181424|7|1|NBT30-HC10-75|Y
01|181424|8|1|NBT30-HC12-75|Y
01|181424|9|1|NBT30-HC16-75|Y
01|181424|10|1|NBT30-HC20-60|Y
01|181424|11|1|NBT30-HC20-75|Y
01|181430|1|1|NBT30-C16-70|Y
01|181430|7|1|NBT30-SK6C-60-J|Y
01|181430|12|1|NBT30-SK13C-75|Y
01|181430|14|1|NBT30-SK13C-75|Y
01|181430|16|1|NBT30-SK13C-90-J|Y
01|181431|1|1|HSK80F-C1-4.00  HSK80F 1 Milling Chuck with 4 Gage|Y
01|181431|1|2|length and Makino Pins and ID Chip Hole.|Y
01|181431|1|3|Lyndex-Nikken to install BIS-C-122-04/L into holder.|Y
01|181441|1|1|HSK100E-SCC0625S-6.00 HSK100E Stub Mill Adapter|Y
01|181441|1|2|for Taiyo Koki Grinder|Y
01|181441|1|3|Pricing is based upon an order of 5 tools.|Y
01|181441|2|1|3HSK100E-SCC0625S-6.00 HSK100E Stub Mill Adapter|Y
01|181441|2|2|for Taiyo Koki Grinder|Y
01|181441|2|3|Pricing is based upon an order of 2 tools.|Y
01|181445|1|1|13687-4125-061522|Y
01|181458|2|1|Please Note: Delivery is based upon receipt of|Y
01|181458|2|2|signed approval drawing when PO is received. This tool|Y
01|181458|2|3|is Special once a purchase order is placed it|Y
01|181458|2|4|cannot be cancelled or returned.|Y
01|181460|1|1|Modified at LYN DIN Form B|Y
01|181460|1|2|**NET PRICE**|Y
01|181497|1|1|For Mazak Integrex 1850V|Y
01|181497|1|2|CAT50 to CAT40 RAH|Y
01|181497|1|3|3 Pin Support specific to Machine Mazak Integrex|Y
01|181497|1|4|Internal + External Coolant|Y
01|181497|1|5|Max 1000 PSI coolant Max 5000 RPM|Y
01|181497|1|6|457.2mm Gauge Length|Y
01|181497|1|7|*****NET PRICING QUOTED NO FURTHER DISCOUNTS*****|Y
01|181497|2|1|For Mazak Integrex 1850V|Y
01|181497|2|2|CAT50 to CAT40 RAH|Y
01|181497|2|3|3 Pin Support specific to Machine Mazak Integrex|Y
01|181497|2|4|Internal + External Coolant|Y
01|181497|2|5|Max 1000 PSI coolant Max 5000 RPM|Y
01|181497|2|6|457.2mm Gauge Length|Y
01|181497|2|7|*****NET PRICING QUOTED NO FURTHER DISCOUNTS*****|Y
01|181497|3|1|For Mazak Integrex 1850V|Y
01|181497|3|2|CAT50 to CAT40 RAH|Y
01|181497|3|3|3 Pin Support specific to Machine Mazak Integrex|Y
01|181497|3|4|Internal + External Coolant|Y
01|181497|3|5|Max 1000 PSI coolant Max 5000 RPM|Y
01|181497|3|6|457.2mm Gauge Length|Y
01|181497|3|7|*****NET PRICING QUOTED NO FURTHER DISCOUNTS*****|Y
01|181497|5|1|For Mazak Integrex 1850V|Y
01|181497|5|2|CAT50 to CAT40 RAH|Y
01|181497|5|3|Direct Flange Mount Machine Mazak Integrex|Y
01|181497|5|4|Internal + External Coolant|Y
01|181497|5|5|Max 1000 PSI coolant Max 5000 RPM|Y
01|181497|5|6|457.2mm Gauge Length|Y
01|181497|5|7|*****NET PRICING QUOTED NO FURTHER DISCOUNTS*****|Y
01|181497|6|1|For Mazak Integrex 1850V|Y
01|181497|6|2|CAT50 to CAT40 RAH|Y
01|181497|6|3|Direct Flange Mount Machine Mazak Integrex|Y
01|181497|6|4|Internal + External Coolant|Y
01|181497|6|5|Max 1000 PSI coolant Max 5000 RPM|Y
01|181497|6|6|457.2mm Gauge Length|Y
01|181497|6|7|*****NET PRICING QUOTED NO FURTHER DISCOUNTS*****|Y
01|181497|7|1|For Mazak Integrex 1850V|Y
01|181497|7|2|CAT50 to CAT40 RAH|Y
01|181497|7|3|Direct Flange Mount Machine Mazak Integrex|Y
01|181497|7|4|Internal + External Coolant|Y
01|181497|7|5|Max 1000 PSI coolant Max 5000 RPM|Y
01|181497|7|6|457.2mm Gauge Length|Y
01|181497|7|7|*****NET PRICING QUOTED NO FURTHER DISCOUNTS*****|Y
01|181502|1|1|REPAIR FOR AA21N-CTRL-750W|Y
01|181502|1|2|TAR-58533|Y
01|181502|1|3|SN: F01425117640019|Y
01|181515|1|1|Discount will vary based on the quantity ordered:|Y
01|181515|1|2|1-3pcs $7107.00 less 27% >> 5188.11 NET/EA|Y
01|181515|1|3|4-6pcs $7107.00 less 30% >> 4974.90 NET/EA|Y
01|181515|1|4|7-9pcs $7107.00 less 35% >> 4619.55 NET/EA|Y
01|181515|1|5|10+pcs $7107.00 less 40% >> 4264.20 NET/EA|Y
01|181528|1|1|1st Batch|Y
01|181542|5|1|$4500.00 Install for 2 tables on one service trip|Y
01|181542|5|2|Amps in the machines must match servo motors|Y
01|181549|3|1|Required wrench if they need|Y
01|181580|2|1|Upon recepit of spindle drawing / specs|Y
01|181583|1|1|1st Batch3/30>5/25>6/E mfg as of 6/20(1)Overrun|Y
01|181583|2|1|1st Batch3/30>4/27>5/25>6/E mfg as of 6/20(1)Overrun|Y
01|181588|1|1|For NIKKEN Factory.|Y
01|181588|1|2|JPY162000/ea(EX rate: $1=135)|Y
01|181588|2|1|For NIKKEN Factory.|Y
01|181588|2|2|JPY229500/ea(EX rate: $1=135)|Y
01|181617|4|1|4th Axis Interface Install Travel & Labor Total|Y
01|181617|4|2|Net Price|Y
01|181626|1|1|DELIVERY: 4stk in JPN (1-2 wks ARO) New PROD ETA 12wks|Y
01|181626|1|2|PLEASE NOTE: PS-A4 is a non stock tool. Once an order|Y
01|181626|1|3|is placed it cannot be cancelled or returned.|Y
01|181627|1|1|PLEASE NOTE: PS-A4 is a non stock tool. Once an order|Y
01|181627|1|2|is placed it cannot be cancelled or returned.|Y
01|181634|1|1|CNC400HFA REPAIR|Y
01|181634|1|2|M-CASE SH#1|Y
01|181634|2|1|CNC400HFA REPAIR|Y
01|181634|2|2|M-CASE SH#2|Y
01|181634|3|1|CNC400HFA REPAIR|Y
01|181634|3|2|M-CASE SH#3|Y
01|181634|4|1|CNC400HFA REPAIR|Y
01|181634|4|2|M-CASE SH#4|Y
01|181634|5|1|CNC400HFA REPAIR|Y
01|181634|5|2|M-CASE SH#5|Y
01|181634|6|1|CNC400HFA REPAIR|Y
01|181634|6|2|M-CASE SH#6|Y
01|181634|7|1|CNC400HFA REPAIR|Y
01|181634|7|2|M-CASE SH#7|Y
01|181634|8|1|CNC400HFA REPAIR|Y
01|181634|8|2|M-CASE SH#8|Y
01|181634|9|1|CNC400HFA REPAIR|Y
01|181634|9|2|TC-CASE SH#1|Y
01|181634|10|1|CNC400HFA REPAIR|Y
01|181634|10|2|TC-CASE SH#2|Y
01|181634|11|1|CNC400HFA REPAIR|Y
01|181634|11|2|TC-CASE SH#3|Y
01|181634|12|1|CNC400HFA REPAIR|Y
01|181634|12|2|TC-CASE SH#4|Y
01|181634|13|1|CNC400HFA REPAIR|Y
01|181634|13|2|TC-CASE SH#5|Y
01|181634|14|1|CNC400HFA REPAIR|Y
01|181634|14|2|TC-CASE SH#8|Y
01|181634|15|1|CNC400HFA REPAIR|Y
01|181634|15|2|TC-CASE SH#9|Y
01|181638|1|1|RGA#TAR-58474|Y
01|181638|1|2|CNC250FA-H  SN#3122|Y
01|181656|6|1|This item is considered special once ordered cannot|Y
01|181656|6|2|be cancelled or returned.|Y
01|181656|11|1|** Closeout Promotion! All sales are FINAL!**|Y
01|181656|13|1|This item is considered special once ordered it cannot|Y
01|181656|13|2|be cancelled or returned|Y
01|181656|17|1|This item is considered special once ordered it cannot|Y
01|181656|17|2|be cancelled or returned|Y
01|181656|20|1|This item is considered special once ordered it cannot|Y
01|181656|20|2|be cancelled or returned.|Y
01|181656|23|1|This item is considered speical once ordered cannot|Y
01|181656|23|2|be cancelled or returned.|Y
01|181656|25|1|This item is considered special once ordered cannot be|Y
01|181656|25|2|cancelled or returned|Y
01|181656|26|1|This item is considered special once ordered it cannot|Y
01|181656|26|2|be cancelled or returned.|Y
01|181656|32|1|This item is considered special once ordered it cannot|Y
01|181656|32|2|be cancelled or returned.|Y
01|181656|33|1|This item si considered special once ordered it cannot|Y
01|181656|33|2|be cancelled or returned.|Y
01|181656|44|1|** Closeout Promotion! All sales are FINAL!**|Y
01|181665|1|1|Delivery is End of July if order is placed this wk.|Y
01|181665|1|2|Otherwise delivery will be in August.|Y
01|181672|1|1|Includes Power and feedback cables from the Nikken|Y
01|181672|1|2|Table to the Machine Bulkhead|Y
01|181672|1|3|Delivery: ships 2 to 3 weeks ARO|Y
01|181677|1|1|2 in stk; Balance ETA 1-2wks ARO|Y
01|181695|1|1|IT50-C25-105|Y
01|181695|2|1|IT50-C25-135|Y
01|181695|2|2|There are currently 5 pcs in Japan which will take|Y
01|181695|2|3|2-3 weeks ARO to get them here.  If no stock at time of|Y
01|181695|2|4|order the ETA would be 16-18 weeks ARO|Y
01|181695|3|1|IT50-C25-165|Y
01|181695|3|2|there is currently one piece in Japan that will take|Y
01|181695|3|3|2-3 weeks ARO to get it here.  If no stock at time of|Y
01|181695|3|4|order ETA is 16-18 weeks ARO|Y
01|181696|1|1|Includes cables|Y
01|181714|3|1|ETA is 1-2 weeks after holders arrive|Y
01|181729|1|1|Includes cables.|Y
01|181731|1|1|REPLACES C4011-0750|Y
01|181731|3|1|Drive keys for old C4011-0750|Y
01|181732|1|1|RNS-13.0F|Y
01|181732|1|2|NC sensor reamer ST shank 13.0mm|Y
01|181757|1|1|Lyndex-Nikken Service Fee at Mitutoyo on 7/12.|Y
01|181757|1|2|For this time we will offer the service at half price.|Y
01|181758|1|1|Meiji Corp Service Fee at Mitutoyo on 7/12.|Y
01|181758|1|2|For this time we will offer the service at half price.|Y
01|181801|1|1|500MM rotary table for horizontal with special face|Y
01|181801|1|2|plate setup for Allen Bradley motor provided by Honda.|Y
01|181801|1|3|Includes RN-CN503HSD-8+1-B Rotary Joint Installed.|Y
01|181804|13|1|THIS REPRESENTS A NOT TO EXCEED CHARGE FOR YEARLY|Y
01|181804|13|2|CALIBRATION. IT WILL BE RE-QUOTED YEARLY.|Y
01|181806|1|1|E46L2-I30 E46L WITH 2 CAMERAS AND 30 TAPER SPINDLE|Y
01|181806|6|1|THIS REPRESENTS A NOT TO EXCEED CHARGE FOR YEARLY|Y
01|181806|6|2|CALIBRATION. IT WILL BE RE-QUOTED YEARLY.|Y
01|181814|1|1|Order part # MZQT47-ER32X-OFF-HS2|Y
01|181814|1|2|Mimatic Part # 184710|Y
01|181815|2|1|PRE-E236PLUS-C4|Y
01|181815|2|2|Presetter E236PLUS w/C4 Spindle|Y
01|181815|7|1|For E236PLUS|Y
01|181815|8|1|For E346PLUS|Y
01|181818|11|1|Discount Reflects purchase of Butler Test Case|Y
01|181824|2|1|HSK125A-1000A-100 Aerospace End Mill Holder 1.0 with|Y
01|181824|2|2|100mm Gage Length|Y
01|181830|2|1|Special order non-cancelable/non-returnable|Y
01|181830|3|1|C50RAM-ER40-215IC-110TP|Y
01|181830|3|2|Special order non-cancelable/non-returnable|Y
01|181830|4|1|Special order non-cancelable/non-returnable|Y
01|181830|6|1|Special order non-cancelable/non-returnable|Y
01|181830|7|1|If no stock @ time of order ETA is 10-11 weeks ARO|Y
01|181830|8|1|Special order non-cancelable/non-returnable|Y
01|181835|2|1|Installation includes: Dual axis drive fiber optic cab|Y
01|181835|2|2|communications cables bulkhead cables external cables|Y
01|181835|2|3|parameter changes service time and travel.|Y
01|181839|8|1|SP Double Head Hydroflex type. MOQ: 1|Y
01|181839|15|1|Hydroflex Clamping Sleeve Clamping Dia: 25mm|Y
01|181853|8|1|SP Double Head Fixed ER40 type. MOQ: 1|Y
01|181855|1|1|7pc add - 8/19|Y
01|181855|1|2|16pc TBD|Y
01|181867|2|1|Delivery 3-5 days after design is completed|Y
01|181874|8|1|SP Double Head Hydroflex type. MOQ: 1|Y
01|181874|15|1|Hydroflex Clamping Sleeve Clamping Dia: 25mm|Y
01|181876|2|1|9TACL63D-B30N46|Y
01|181876|2|2|BT30 adapter for TACL-B40H63|Y
01|181876|6|1|TW30  (BT30 Tool Wagon)|Y
01|181885|1|1|1st Batch/For stock 4/17/20: DWG Approved.|Y
01|181892|5|1|Price reduced for matching to non-dual contact|Y
01|181902|3|1|Shank OD Grinding Cost 1(25.4mm) --> 25.0mm|Y
01|181902|3|2|with Flat|Y
01|181902|8|1|Shank OD Grinding Cost 1(25.4mm) --> 25.0mm|Y
01|181903|7|1|Quoted at NET price each Once a purchase order is|Y
01|181903|7|2|placed it cannot be cancelled or returned.|Y
01|181907|1|1|RGA#LVR-58513/|Y
01|181907|1|2|Repair of MZQT5-CT40X-OFF-ICE s/n:82925 02|Y
01|181907|1|3|(Mimatic#103663)|Y
01|181907|2|1|Bearings seals o-rings and 1 damaged input spindle|Y
01|181907|2|2|to be replaced. Recondition 1 output spindle.|Y
01|181914|1|1|IT-SK25-90 Net Price No additional Discount|Y
01|181914|1|2|Special Item Not Cancelable Or Returnable|Y
01|181914|1|3|Any QTY over 1 will be 4 to 5 Months ARO|Y
01|181914|2|1|IT40-SK25C-120 Net Price No Additional Discount|Y
01|181914|2|2|Special Item Not Cancelable Or Returnable|Y
01|181914|3|1|IT40-SK25-180 Net Price No Addintional Discount|Y
01|181914|3|2|Special Item Not Cancelable Or Returnable|Y
01|181914|3|3|Any Quantity Above 1 Will Be 4 To 5 Months ARO|Y
01|181923|6|1|Part Number TBD H63ARAM-ER25-187OTIC-65TP|Y
01|181923|6|2|but with a height held 7.3608 +/-.001|Y
01|181923|6|3|Distance from spindle face to right angle spindle|Y
01|181923|6|4|centerline.|Y
01|181923|6|5|PRICE FOR 2 Heads: $10617.80 less 27% Total $15501.99|Y
01|181923|6|6|PRICE FOR 3 Heads: $10290.00 less 27% Total $22535.10|Y
01|181923|6|7|DELIVERY for 2 or 3 heads 7 Weeks ARO|Y
01|181925|1|1|Customer wanted10 offered this as avail substitute|Y
01|181943|1|1|RGA#LVR-58545/|Y
01|181943|1|2|Repair of BMT45-ER25X s/n:92220 02 (Mimatic#176867)|Y
01|181943|2|1|Bearings seals and o-rings to be replaced.|Y
01|181953|6|1|Special item not cancelable nor returnable|Y
01|181953|7|1|Special item not cancelable nor returnable|Y
01|181954|2|1|POSITIONING BLOCK FOR CAT50 SPEEDER|Y
01|181956|1|1|RGA#CUR-58442/|Y
01|181956|1|2|Repair of H63RAM-ER25-1870TC s/n:45829 02|Y
01|181956|1|3|(Mimatic#179165)|Y
01|181956|2|1|Bearings seals o-rings to be replaced. Adjusting|Y
01|181956|2|2|centerline dimension from flange to output spindle to|Y
01|181956|2|3|requested tolerance.|Y
01|181998|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|181998|4|1|NET PRICE; INSTALLATION INCLUDES ALL HARDWARE|Y
01|181998|4|2|SOFTWARE PARAMETERS CABLING WIRING FOR ROTARY|Y
01|181998|4|3|TABLE IN ADDITION TO TRAVEL EXPENSES FOR SERVICE TECH|Y
01|181998|6|1|Current estimate of freight charge shipping via truck|Y
01|181998|8|1|FEMCO|Y
01|182018|1|1|NBT50-C25-200|Y
01|182018|1|2|Taper Plus Dual Contact BT50 25mm Milling Chuck with|Y
01|182018|1|3|200mm gage length|Y
01|182018|1|4|*Special|Y
01|182045|1|1|Software modification per request.|Y
01|182045|1|2|Parts loaded on a given fixture. Currently 1-9|Y
01|182045|1|3|Modification to be 1-99|Y
01|182046|1|1|A Special version of angle-head part # TBA|Y
01|182046|1|2|CAT50 AGH; MI50; A=110mm  L=180mm L1=75mm|Y
01|182046|1|3|1:1 Gear Max 70Nm; 6500RPM; External Coolant Max 70Bar|Y
01|182046|1|4|REF DRWG# 00044430|Y
01|182046|1|5|SPECIAL ITEMNOT CANCELABLE NOR RETURNABLE ONCE ORDERED|Y
01|182046|2|1|NET ea price No additional discount.|Y
01|182062|4|1|Choose either coolant thru or jet slots|Y
01|182065|1|1|Replaces T08-D310S-F Currency:USD|Y
01|182065|1|2|Ref.Customer PO#13648|Y
01|182070|2|1|Table needs to be converted from Brother Sanyo to Fanuc|Y
01|182070|2|2|This will include: Motors gears wireharness covers|Y
01|182070|2|3|solenoid and pressure switches and labor.|Y
01|182078|2|1|Upon receipt of spindle drawing or specifications|Y
01|182081|1|1|Includes Haas motor and cable|Y
01|182081|6|1|Includes Haas motor and cables.|Y
01|182089|13|1|***Need current roller bearings measured***|Y
01|182089|22|1|Replaces SC17358|Y
01|182095|1|1|PLEASE NOTE: ZKG12-NO.8U is a non stock tool. Once an|Y
01|182095|1|2|order is placed it cannot be cancelled or returned.|Y
01|182103|2|1|ALTERNATIVE TO ABOVE|Y
01|182110|2|1|Installation of two 4th axis tables to FV56T-APC|Y
01|182110|2|2|installation to include dual axis drive short bar|Y
01|182110|2|3|fiber optic cables communications cables bulkhead|Y
01|182110|2|4|cables external cables parameter changes service|Y
01|182110|2|5|time and travel. Installation to take approx two days.|Y
01|182130|1|1|RGA#TAR-58528|Y
01|182130|1|2|5AX-2MT-105-120FA-M|Y
01|182130|1|3|SN:26533TC|Y
01|182132|5|1|5% extra discount has been applied to this quote.|Y
01|182133|2|1|replaces part#C4016-0125-4.00|Y
01|182133|4|1|replaces C4016-0187-4.00|Y
01|182136|1|1|RGA#LVR-58525/|Y
01|182136|1|2|Repair of MZMP46-ER16-AD-HS s/n:19907494 01|Y
01|182136|1|3|(Mimatic#125051)|Y
01|182136|2|1|Replace worm gear adjustment gear and realign tool.|Y
01|182136|2|2|Change name plate to part#MZMP46-ER16-AD-HS|Y
01|182139|2|1|NET ea price with no extra discount|Y
01|182139|2|2|Ships after speeder is received to pull dimensions|Y
01|182142|1|1|1st Batch|Y
01|182142|2|1|1st Batch|Y
01|182142|3|1|1st Batch|Y
01|182142|4|1|1st Batch|Y
01|182142|5|1|1st Batch|Y
01|182142|6|1|1st Batch|Y
01|182142|7|1|1st Batch|Y
01|182142|8|1|1st Batch|Y
01|182142|9|1|1st Batch|Y
01|182142|10|1|1st Batch|Y
01|182142|11|1|1st Batch|Y
01|182142|12|1|1st Batch|Y
01|182142|13|1|1st Batch|Y
01|182142|14|1|1st Batch|Y
01|182142|15|1|1st Batch|Y
01|182142|16|1|1st Batch|Y
01|182142|17|1|1st Batch|Y
01|182142|18|1|1st Batch|Y
01|182142|19|1|1st Batch|Y
01|182142|20|1|1st Batch|Y
01|182142|21|1|1st Batch|Y
01|182142|22|1|1st Batch|Y
01|182142|23|1|1st Batch|Y
01|182142|24|1|1st Batch|Y
01|182142|25|1|1st Batch|Y
01|182142|26|1|1st Batch|Y
01|182142|27|1|1st Batch|Y
01|182142|28|1|1st Batch|Y
01|182142|29|1|1st Batch|Y
01|182142|31|1|1st Batch|Y
01|182147|40|1|Option for above this P/N doesn't have the ID Chip|Y
01|182147|40|2|hole like the standard -IDU P/N's. 1 pc. currently Stk.|Y
01|182169|1|1|SOLD AS-IS - All Sales are final.|Y
01|182169|1|2|Cannot be cancalled or returned.|Y
01|182188|3|1|Line item contains the following:|Y
01|182188|3|2|x2 Metal Ring for back of tailstock|Y
01|182188|3|3|x2 brackets for prox sensors (above)|Y
01|182188|3|4|x1 metal shroud to fit entire back of tailstock|Y
01|182214|1|1|Please Note: These holders have coolant ports and are|Y
01|182214|1|2|not pluggable. If they are not running coolant thru|Y
01|182214|1|3|the tool they will work fine.|Y
01|182214|1|4|Delivery: Next cut off date for placing order is 08/05|Y
01|182214|1|5|for delivery to Turbocam the week of 08/22.|Y
01|182216|3|1|SOLD AS-IS - All sales are final|Y
01|182223|1|1|One-Time Discount applied for test holder|Y
01|182223|1|2|Non-Returnable|Y
01|182252|1|1|RGA#TAR-58518|Y
01|182252|1|2|5AX-2002|Y
01|182252|1|3|SN:2308|Y
01|182279|1|1|Includes a Long Motor Cover needed for existing longer|Y
01|182279|1|2|Motor.|Y
01|182281|3|1|NET ea price no additional discount|Y
01|182281|3|2|Head will ship first for customer to provide dimension|Y
01|182281|3|3|for block to be made and shipped|Y
01|182281|9|1|NET ea price no additional discount|Y
01|182281|9|2|Head will ship first for customer to provide dimension|Y
01|182281|9|3|for block to be made and shipped|Y
01|182286|1|1|G16-8 >> 8mm Collar/Spacer for Arbor Holder|Y
01|182286|1|2|PLEASE NOTE: G16-8 is a non-stock tooling. Once an|Y
01|182286|1|3|order is placed it cannot be cancelled or returned.|Y
01|182286|2|1|G16-10 >> 10mm Collar/Spacer for Arbor Holder|Y
01|182286|2|2|PLEASE NOTE: G16-10 is a non-stock tooling. Once an|Y
01|182286|2|3|order is placed it cannot be cancelled or returned.|Y
01|182303|1|1|Please Note: This tool holder is non standard stock.|Y
01|182303|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|182303|1|3|or returned.|Y
01|182304|11|1|This discontinued item once ordered cannot be returned|Y
01|182304|12|1|This discontinued item once ordered cannot be returned|Y
01|182329|4|1|Alternate for 120mm|Y
01|182347|1|1|BMT85-CAPTO5X-ICE Mimatic #198315Ref Drwg 00060823|Y
01|182347|1|2|NET ea priceno additional discount. Item is a special|Y
01|182347|1|3|that is non cancelablenor returnable once ordered.|Y
01|182347|2|1|BMT85-CAPTO5Z-ICE Mimatic #198316Ref Drwg 00060869|Y
01|182347|2|2|NET ea priceno additional discount. Item is a special|Y
01|182347|2|3|that is non cancelablenor returnable once ordered.|Y
01|182359|1|1|HSK63A .500 x  3.15 GL - No coolant ports|Y
01|182410|1|1|*For B40RA-0025 purchased on SO#776592 05/2018|Y
01|182410|1|2|PO# 7111830|Y
01|182428|1|1|REPAIR OF X4 A21-400W-R CONTROLLERS|Y
01|182428|1|2|BOTH HAVE 4001 ALARM THAT WILL NOT CLEAR|Y
01|182428|1|3|X1 CONTROLLER RESET - OK|Y
01|182428|1|4|X1 CONTROLLER RESET - FAILED - NEED NEW MOTION PACK|Y
01|182438|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|182438|6|1|HAAS MACHINE WILL NEED:|Y
01|182438|6|2|4TH AXIS DRIVE & 3RD PARTY ROTARY TABLE SOFTWARE|Y
01|182438|6|3|ONCE THESE ITEMS ARE INSTALLED WE CAN COME IN|Y
01|182438|6|4|TO PERFORM THE INSTALLATION. OUR INSTALLATION COST|Y
01|182438|6|5|INCLUDES: LABOR + TRAVEL EXPENSES WIRING FROM|Y
01|182438|6|6|ELECTRICAL CABINET TO BULKHEAD BULKHEAD CONNECTORS|Y
01|182438|6|7|AND PARAMETER MODIFICATIONS.|Y
01|182450|1|1|1st Batch/Stock *DWG saved in Teams File|Y
01|182454|2|1|2 Riser 1 pc $1625ea 3 pc $1500ea 5 pc $1380ea|Y
01|182454|2|2|2-3 Wks ARO for 1 piece and 3-4 wks for larger qtys|Y
01|182465|1|1|Lyndex Nikken Part# MZQT5-ER40X-ICE / Mimatic #100875|Y
01|182465|1|2|MAZAK LIVE - ER40; STRAIGHT;INT/EXT COOLANT/ICE VERSION|Y
01|182465|1|3|MAX 70BAR;1:1 GEAR MAX 6500 RPM; MAX 100Nm|Y
01|182465|1|4|Price break 2 pcs = $4130.00 each|Y
01|182465|1|5|3 pcs = $4075.00 each|Y
01|182465|4|1|Lyndex Nikken Part# MZQT5-ER25-AD - Mimatic 192542|Y
01|182465|4|2|MAZAK LIVE - ER40; STRAIGHT;INT/EXT COOLANT/ICE VERSION|Y
01|182465|4|3|MAX 70BAR; 1:1 GEAR MAX 6500 RPM; MAX 100Nm|Y
01|182465|4|4|Price is for 1-3 pc no price breaks.|Y
01|182479|1|1|LVR-58548/|Y
01|182479|1|2|Repair of NK103-16000 s/n:AL0001 (Alps#NK103-16002)|Y
01|182479|2|1|Bearings o-rings and collet nut to be replaced.|Y
01|182499|6|1|Includes up to 8 hours for installation & training|Y
01|182512|9|1|to make for 0.0625 reamer|Y
01|182512|9|2|customer must have machined to desire size|Y
01|182512|12|1|to make for 0.093|Y
01|182512|12|2|customer must have machined to desire size|Y
01|182512|15|1|to make for 0.218|Y
01|182512|15|2|customer must have machined to desire size|Y
01|182516|11|1|for .0625 Reamer|Y
01|182516|11|2|customer must have machined to desire size|Y
01|182516|13|1|to make for 0.093 reamer|Y
01|182516|13|2|customer must have machined to desire size|Y
01|182516|16|1|to make for 0.093|Y
01|182516|16|2|customer must have machined to desire size|Y
01|182516|17|1|This items is considered special once ordered cannot|Y
01|182516|17|2|be cancelled or returned.|Y
01|182516|18|1|This items is considered special once ordered cannot|Y
01|182516|18|2|cancelled or returned|Y
01|182516|19|1|For .0625 Reamer|Y
01|182516|19|2|customer must have machined to desire size|Y
01|182516|23|1|to hold 0.0625 reamer|Y
01|182520|1|1|RGA#TAR-58535|Y
01|182520|1|2|5AX-2MT-105-120|Y
01|182541|1|1|2pc $5090.00 Ea/Net|Y
01|182541|1|2|1pc $7744.00 Ea/Net|Y
01|182541|3|1|2pc $8770.00 Ea/Net|Y
01|182541|3|2|1pc $13156.00 Ea/Net|Y
01|182541|8|1|2pc|Y
01|182541|8|2|4pc|Y
01|182544|1|1|Thickness to be 1.164 per print|Y
01|182545|1|1|s/n.13941  w/o Direct mount Cable and Motor|Y
01|182545|3|1|TCD-C4549|Y
01|182545|3|2|10+1p Rortaty Joint Built-In for CNC260FA S/N 13941|Y
01|182545|6|1|Air Freight Charge (Delivery 2 weeks)|Y
01|182545|6|2|Note: Boat (No charge but delivery 2 months)|Y
01|182546|4|1|ADDITIONAL COOLING UNIT FOR START2 SHRINK MACHINE|Y
01|182546|5|1|WAS ORIGINALLY 3 PIECES; NOW JOEY WANTS 8 MORE = 11|Y
01|182546|6|1|ORIGINAL QUANTITY 2; JOEY ADDED 4 = 6 TOTAL|Y
01|182546|7|1|ORIGINAL QUANTITY 2; JOEY ADDING 4; TOTAL 6 NOW|Y
01|182550|1|1|RGA#TOR-58543/|Y
01|182550|1|2|Repair of PF-2|Y
01|182550|4|1|Calibration service included.|Y
01|182553|1|1|This item is considered special once ordered cannot|Y
01|182553|1|2|be cancelled or returned.|Y
01|182559|1|1|1st Batch for Stock  12/28:DWG Approved by Tim|Y
01|182559|2|1|Req. INS/T/P Inspection Required|Y
01|182560|1|1|1st Batch *Delayed due to COVID situation in Taiwan|Y
01|182560|2|1|Req. INS/T/P Inspection Required|Y
01|182563|1|1|NET ea price holder modified to add 2ea DIN holes|Y
01|182563|1|2|Cannot use with back up screw|Y
01|182563|1|3|Special itemnot cancelablenor returnable once ordered|Y
01|182563|2|1|NET ea priceholder part # will be BT40-SK16F-150-M|Y
01|182563|2|2|Not for use with back up screw|Y
01|182563|2|3|Special itemnot cancelablenor returnable once ordered|Y
01|182563|3|1|@ DIN holes will be added to the holder|Y
01|182564|1|1|RGA#TOR-58581/|Y
01|182564|1|2|Repair of PF-2|Y
01|182564|3|1|Calibration service included.|Y
01|182577|1|1|JOB#225511|Y
01|182577|3|1|JOB#223610|Y
01|182577|5|1|JOB#223618|Y
01|182579|2|1|CNCZ202LFA Inspection Fee.|Y
01|182579|2|2|If order a repair or new table we will deny this cost.|Y
01|182590|16|1|Alternative to 3 gage length|Y
01|182592|4|1|ADDITIONAL COOLING UNIT FOR START2 SHRINK MACHINE|Y
01|182597|2|1|HSK63A-HC20-100|Y
01|182612|1|1|RGA#TOR-58573/|Y
01|182612|1|2|Repair of BT40-UMT200|Y
01|182615|2|1|Part #MI50-SM1 >>MI50 Shell Mill Holder 1|Y
01|182615|2|2|Drawing sent to Will.|Y
01|182622|1|1|Includes: Shrink Fit Unit Cooling Station Induction|Y
01|182622|1|2|Ring Set Cooling Bracket Set Storage Rack and (2)|Y
01|182622|1|3|Chuck Holders of Choice (CAT40 CAT50 HSK63...)|Y
01|182623|6|1|Package pricing includes 10 standard inch size SF|Y
01|182623|6|2|holders with less than 6.00 gage lengths and a 200V|Y
01|182623|6|3|shrink fit unit with accessories. listed on promotion|Y
01|182623|6|4|flyer.|Y
01|182642|2|1|PLEASE NOTE: KM32-3 is a non stock tool. Once an order|Y
01|182642|2|2|is placed it cannot be cancelled or returned.|Y
01|182642|3|1|PLEASE NOTE: KM32-7 is a non stock tool. Once an order|Y
01|182642|3|2|is placed it cannot be cancelled or returned.|Y
01|182642|4|1|PLEASE NOTE: KM32-9 is a non stock tool. Once an order|Y
01|182642|4|2|is placed it cannot be cancelled or returned.|Y
01|182642|5|1|PLEASE NOTE: KM32-11 is a non stock tool. Once an order|Y
01|182642|5|2|is placed it cannot be cancelled or returned.|Y
01|182642|6|1|PLEASE NOTE: KM32-21 is a non stock tool. Once an order|Y
01|182642|6|2|is placed it cannot be cancelled or returned.|Y
01|182642|7|1|PLEASE NOTE: KM32-22 is a non stock tool. Once an order|Y
01|182642|7|2|is placed it cannot be cancelled or returned.|Y
01|182642|8|1|PLEASE NOTE: KM32-23 is a non stock tool. Once an order|Y
01|182642|8|2|is placed it cannot be cancelled or returned.|Y
01|182642|9|1|PLEASE NOTE: KM32-24 is a non stock tool. Once an order|Y
01|182642|9|2|is placed it cannot be cancelled or returned.|Y
01|182642|10|1|PLEASE NOTE: KM32-30 is a non stock tool. Once an order|Y
01|182642|10|2|is placed it cannot be cancelled or returned.|Y
01|182653|1|1|CANNOT BE CONVERTED TO 380V|Y
01|182680|1|1|1st Batch|Y
01|182680|2|1|1st Batch|Y
01|182680|3|1|1st Batch|Y
01|182680|4|1|1st Batch|Y
01|182680|5|1|1st Batch|Y
01|182680|6|1|1st Batch|Y
01|182680|7|1|1st Batch|Y
01|182680|8|1|1st Batch|Y
01|182680|9|1|1st Batch|Y
01|182680|10|1|1st Batch|Y
01|182680|11|1|1st Batch|Y
01|182680|12|1|1st Batch|Y
01|182680|13|1|1st Batch|Y
01|182680|14|1|1st Batch|Y
01|182680|15|1|1st Batch|Y
01|182680|16|1|1st Batch|Y
01|182680|17|1|1st Batch|Y
01|182680|18|1|1st Batch|Y
01|182680|19|1|1st Batch|Y
01|182680|20|1|1st Batch|Y
01|182680|21|1|1st Batch|Y
01|182680|22|1|1st Batch|Y
01|182680|23|1|1st Batch|Y
01|182680|24|1|1st Batch|Y
01|182680|25|1|1st Batch|Y
01|182680|26|1|1st Batch|Y
01|182680|27|1|1st Batch|Y
01|182694|2|1|CNCZ321MA Inspection Fee|Y
01|182694|2|2|If order a repair or new table we will deny this cost.|Y
01|182694|8|1|S/N 15178  Including special modification costs.|Y
01|182694|9|1|Direct Cables (TCE-63225/4 & TCE-95587/2)|Y
01|182694|12|1|Special Plate for Oil change|Y
01|182694|13|1|SP Plate Installtion Cost & Oil Change Cost|Y
01|182694|13|2|Not Including Oil Cost.|Y
01|182695|2|1|CNC170LA21 Inspection Fee.|Y
01|182695|2|2|If order a repair or new table we will deny this cost.|Y
01|182696|9|1|HSK63A-SK16C-180-J-IDU|Y
01|182696|9|2|HSK63A SK16 Slim Chuck Coolant IdChipHole 15000rpm|Y
01|182696|9|3|Special Gage Length 180mm with Coolant Nut (SKN-16BJ)|Y
01|182711|1|1|*Note: Item is non-standard stockonce a PO has been|Y
01|182711|1|2|recieved it can not be cancelled or returned.|Y
01|182720|1|1|Part Number to Be Determined: Mimatic PN #201345|Y
01|182720|1|2|Modular Angle Head Attachment ER20 Long ;|Y
01|182720|1|3|L=150mm; L1=135mm; L2=25mm;|Y
01|182720|1|4|1:1 GEAR MAX 6000RPM; MAX 10Nm;|Y
01|182720|1|5|INT/ EXT COOLANT; MAX 70 BAR;REF DRWG# 00044404|Y
01|182750|3|1|External cables for hooking table to machine tool.|Y
01|182750|3|2|**CUSTOMER MUST SUPPLY NEEDED LENGTH**|Y
01|182750|4|1|This includes travel and labor for putting new table on|Y
01|182750|4|2|machine hooking up to existing interface setting zero|Y
01|182750|4|3|and new parameters.  Net Cost.|Y
01|182754|1|1|Includes CNC260P Nikken 4th Axis TAT250 Heavy Duty|Y
01|182754|1|2|Air Tail Support. Martin 11x30x2 working surface|Y
01|182754|1|3|1.25 thick baseplate for assembly. Mounting holes|Y
01|182754|1|4|and keyways for the Nikken CNC260P and TAT250.|Y
01|182754|1|5|Baseplate will be made to fit onto Mazak VCN510|Y
01|182754|1|6|Dowel pins will be used to locate plate into t-slots of|Y
01|182754|1|7|Table.Plate will mount to t-slot with provide hardware|Y
01|182754|1|8|CNC260P and TAT250 will be shipped to Martin and ship|Y
01|182754|1|9|as a complete unit|Y
01|182754|2|1|Install includes travel and labor. Includes mounting|Y
01|182754|2|2|the system with the use of customer supplied lifting|Y
01|182754|2|3|Wiring interfaceset up grid shift parameters|Y
01|182756|1|1|part# TBD|Y
01|182756|1|2|Ref. Drawing# 198316|Y
01|182756|1|3|BMT85 90-Degree Live Tool Capto5 Output|Y
01|182756|2|1|part# TBD|Y
01|182756|2|2|Ref. Drawing# 198315|Y
01|182756|2|3|BMT85 Straight Live Tool Capto5 Output|Y
01|182766|9|1|6K RPM|Y
01|182766|10|1|6K RPM|Y
01|182789|1|1|RGA#LVR-58570/|Y
01|182789|1|2|Repair of BMT65-ER32X s/n:77121 07 (Mimatic#186489)|Y
01|182789|2|1|Bearings seals and o-rings to be replaced.|Y
01|182794|1|1|HSK100A-SK25C-250 >> HSK100A SK25 Slim Chuck Coolant|Y
01|182794|1|2|PLEASE NOTE: HSK100A-SK25C-250 is a non stock tool.|Y
01|182794|1|3|Once an order is placed it cannot be cancelled or|Y
01|182794|1|4|returned.|Y
01|182794|2|1|PLEASE NOTE: HSK100A-SK25C-300 is a non stock tool.|Y
01|182794|2|2|Once an order is placed it cannot be cancelled or|Y
01|182794|2|3|returned.|Y
01|182823|1|1|Sold As-Is All Sales are final|Y
01|182850|1|1|RGA#TOR-58564/|Y
01|182850|1|2|Repair of PF-2|Y
01|182850|3|1|Calibration service included.|Y
01|182850|3|2|Need to be calibrated to .0008 or better.|Y
01|182850|5|1|RGA#TOR-58564/|Y
01|182850|5|2|Repair of PF-2|Y
01|182850|7|1|Calibration service included.|Y
01|182850|7|2|Need to be calibrated to .0008 or better.|Y
01|182852|18|1|PLEASE NOTE: SKJ25-4C is a non stock tool. Once an|Y
01|182852|18|2|order is placed it cannot be cancelled or returned.|Y
01|182852|20|1|SKJ25-4.5C >> SK20/SK25 Coolant Cap 4.5mm|Y
01|182852|20|2|PLEASE NOTE: SKJ25-4.5C is a non stock tool. Once an|Y
01|182852|20|3|order is placed it cannot be cancelled or returned.|Y
01|182852|22|1|SKJ25-5C >> SK20/SK25 Coolant Cap 5.0mm|Y
01|182852|22|2|PLEASE NOTE: SKJ25-5C is a non stock tool. Once an|Y
01|182852|22|3|order is placed it cannot be cancelled or returned.|Y
01|182852|24|1|SKJ25-5.5C  >> SK20/SK25 Coolant Cap 5.5mm|Y
01|182852|24|2|PLEASE NOTE: SKJ25-5.5C is a non stock tool. Once an|Y
01|182852|24|3|order is placed it cannot be cancelled or returned.|Y
01|182852|26|1|PLEASE NOTE: SKJ25-6C is a non stock tool. Once an|Y
01|182852|26|2|order is placed it cannot be cancelled or returned.|Y
01|182852|28|1|SKJ25-6.5C >> SK20/SK25 Coolant Cap 6.5mm|Y
01|182852|28|2|PLEASE NOTE: SKJ25-6.5C is a non stock tool. Once an|Y
01|182852|28|3|order is placed it cannot be cancelled or returned.|Y
01|182852|30|1|SKJ25-7C >> SK20/SK25 Coolant Cap 7.0mm|Y
01|182852|30|2|PLEASE NOTE: SKJ25-7C is a non stock tool. Once an|Y
01|182852|30|3|order is placed it cannot be cancelled or returned.|Y
01|182852|32|1|SKJ25-7.5C  >> SK20/SK25 Coolant Cap 7.5mm|Y
01|182852|32|2|PLEASE NOTE: SKJ25-7.5C is a non stock tool. Once an|Y
01|182852|32|3|order is placed it cannot be cancelled or returned.|Y
01|182852|34|1|PLEASE NOTE: SKJ25-8C is a non stock tool. Once an|Y
01|182852|34|2|order is placed it cannot be cancelled or returned.|Y
01|182852|36|1|Last 1pc Stk in JPN >> DELIVERY 2-3wks ARO|Y
01|182852|36|2|New production delivery >> 14-15wks ARO|Y
01|182852|36|3|PLEASE NOTE: SKJ25-8.5C is a non stock tool. Once an|Y
01|182852|36|4|order is placed it cannot be cancelled or returned.|Y
01|182852|38|1|PLEASE NOTE: SKJ25-9C is a non stock tool. Once an|Y
01|182852|38|2|order is placed it cannot be cancelled or returned.|Y
01|182852|40|1|SKJ25-9.5C >> SK20/SK25 Coolant Cap 9.5mm|Y
01|182852|40|2|PLEASE NOTE: SKJ25-9.5C is a non stock tool. Once an|Y
01|182852|40|3|order is placed it cannot be cancelled or returned.|Y
01|182852|42|1|PLEASE NOTE: SKJ25-10C is a non stock tool. Once an|Y
01|182852|42|2|order is placed it cannot be cancelled or returned.|Y
01|182852|43|1|PLEASE NOTE: SK20-10.5 is a non stock tool. Once an|Y
01|182852|43|2|order is placed it cannot be cancelled or returned.|Y
01|182852|44|1|SKJ25-10.5C  >> SK20/SK25 Coolant Cap 10.5mm|Y
01|182852|44|2|PLEASE NOTE: SKJ25-10.5C is a non stock tool. Once an|Y
01|182852|44|3|order is placed it cannot be cancelled or returned.|Y
01|182852|46|1|PLEASE NOTE: SKJ25-11C is a non stock tool. Once an|Y
01|182852|46|2|order is placed it cannot be cancelled or returned.|Y
01|182852|48|1|SKJ25-11.5C >> SK20/SK25 Coolant Cap 11.5mm|Y
01|182852|48|2|PLEASE NOTE: SKJ25-11.5C is a non stock tool. Once an|Y
01|182852|48|3|order is placed it cannot be cancelled or returned.|Y
01|182852|50|1|PLEASE NOTE: SKJ25-12C is a non stock tool. Once an|Y
01|182852|50|2|order is placed it cannot be cancelled or returned.|Y
01|182852|52|1|SKJ25-12.5C >> SK20/SK25 Coolant Cap 12.5mm|Y
01|182852|52|2|PLEASE NOTE: SKJ25-12.5C is a non stock tool. Once an|Y
01|182852|52|3|order is placed it cannot be cancelled or returned.|Y
01|182852|54|1|SKJ25-13C >> SK20/SK25 Coolant Cap 13mm|Y
01|182852|54|2|PLEASE NOTE: SKJ25-13 is a non stock tool. Once an|Y
01|182852|54|3|order is placed it cannot be cancelled or returned.|Y
01|182852|56|1|SKJ25-13.5C >> SK20/SK25 Coolant Cap 13.5mm|Y
01|182852|56|2|PLEASE NOTE: SKJ25-13.5C is a non stock tool. Once an|Y
01|182852|56|3|order is placed it cannot be cancelled or returned.|Y
01|182852|58|1|PLEASE NOTE: SKJ25-14C is a non stock tool. Once an|Y
01|182852|58|2|order is placed it cannot be cancelled or returned.|Y
01|182852|60|1|SKJ25-14.5C >> SK20/SK25 Coolant Cap 14.5mm|Y
01|182852|60|2|PLEASE NOTE: SKJ25-14.5C is a non stock tool. Once an|Y
01|182852|60|3|order is placed it cannot be cancelled or returned.|Y
01|182852|62|1|SKJ25-15C >> SK20/SK25 Coolant Cap 15mm|Y
01|182852|62|2|PLEASE NOTE: SKJ25-15C is a non stock tool. Once an|Y
01|182852|62|3|order is placed it cannot be cancelled or returned.|Y
01|182852|64|1|SKJ25-15.5C >> SK20/SK25 Coolant Cap 15.5mm|Y
01|182852|64|2|PLEASE NOTE: SKJ25-15.5C is a non stock tool. Once an|Y
01|182852|64|3|order is placed it cannot be cancelled or returned.|Y
01|182852|68|1|SKJ25-16.5C >> SK20/SK25 Coolant Cap 16.5mm|Y
01|182852|68|2|PLEASE NOTE: SKJ25-16.5C is a non stock tool. Once an|Y
01|182852|68|3|order is placed it cannot be cancelled or returned.|Y
01|182852|70|1|PLEASE NOTE: SKJ25-17C is a non stock tool. Once an|Y
01|182852|70|2|order is placed it cannot be cancelled or returned.|Y
01|182852|72|1|PLEASE NOTE: SKJ25-17.5C is a non stock tool. Once an|Y
01|182852|72|2|order is placed it cannot be cancelled or returned.|Y
01|182852|76|1|SKJ25-18.5C >> SK20/SK25 Coolant Cap 18.5mm|Y
01|182852|76|2|PLEASE NOTE: SKJ25-18.5C is a non stock tool. Once an|Y
01|182852|76|3|order is placed it cannot be cancelled or returned.|Y
01|182852|78|1|SKJ25-19C >> SK20/SK25 Coolant Cap 19mm|Y
01|182852|78|2|PLEASE NOTE: SKJ25-19C is a non stock tool. Once an|Y
01|182852|78|3|order is placed it cannot be cancelled or returned.|Y
01|182852|80|1|PLEASE NOTE: SKJ25-19.5C is a non stock tool. Once an|Y
01|182852|80|2|order is placed it cannot be cancelled or returned.|Y
01|182852|85|1|SKJ25-16.5C >> SK20/SK25 Coolant Cap 16.5mm|Y
01|182852|85|2|PLEASE NOTE: SKJ25-16.5C is a non stock tool. Once an|Y
01|182852|85|3|order is placed it cannot be cancelled or returned.|Y
01|182852|87|1|PLEASE NOTE: SKJ25-17C is a non stock tool. Once an|Y
01|182852|87|2|order is placed it cannot be cancelled or returned.|Y
01|182852|89|1|PLEASE NOTE: SKJ25-17.5C is a non stock tool. Once an|Y
01|182852|89|2|order is placed it cannot be cancelled or returned.|Y
01|182852|93|1|SKJ25-18.5C >> SK20/SK25 Coolant Cap 18.5mm|Y
01|182852|93|2|PLEASE NOTE: SKJ25-18.5C is a non stock tool. Once an|Y
01|182852|93|3|order is placed it cannot be cancelled or returned.|Y
01|182852|95|1|SKJ25-19C >> SK20/SK25 Coolant Cap 19mm|Y
01|182852|95|2|PLEASE NOTE: SKJ25-19C is a non stock tool. Once an|Y
01|182852|95|3|order is placed it cannot be cancelled or returned.|Y
01|182852|97|1|PLEASE NOTE: SKJ25-19.5C is a non stock tool. Once an|Y
01|182852|97|2|order is placed it cannot be cancelled or returned.|Y
01|182852|101|1|SKJ25-20.5C >> SK20/SK25 Coolant Cap 20.5mm|Y
01|182852|101|2|PLEASE NOTE: SKJ25-20.5C is a non stock tool. Once an|Y
01|182852|101|3|order is placed it cannot be cancelled or returned.|Y
01|182852|103|1|PLEASE NOTE: SKJ25-21C is a non stock tool. Once an|Y
01|182852|103|2|order is placed it cannot be cancelled or returned.|Y
01|182852|105|1|SKJ25-21.5C >> SK20/SK25 Coolant Cap 21.5mm|Y
01|182852|105|2|PLEASE NOTE: SKJ25-21.5C is a non stock tool. Once an|Y
01|182852|105|3|order is placed it cannot be cancelled or returned.|Y
01|182852|107|1|PLEASE NOTE: SKJ25-22C is a non stock tool. Once an|Y
01|182852|107|2|order is placed it cannot be cancelled or returned.|Y
01|182852|109|1|SKJ25-22.5C >> SK20/SK25 Coolant Cap 22.5mm|Y
01|182852|109|2|PLEASE NOTE: SKJ25-22.5C is a non stock tool. Once an|Y
01|182852|109|3|order is placed it cannot be cancelled or returned.|Y
01|182852|111|1|SKJ25-23C >> SK20/SK25 Coolant Cap 23mm|Y
01|182852|111|2|PLEASE NOTE: SKJ25-23C is a non stock tool. Once an|Y
01|182852|111|3|order is placed it cannot be cancelled or returned.|Y
01|182852|113|1|SKJ25-23.5C >> SK20/SK25 Coolant Cap 23.5mm|Y
01|182852|113|2|PLEASE NOTE: SKJ25-23.5C is a non stock tool. Once an|Y
01|182852|113|3|order is placed it cannot be cancelled or returned.|Y
01|182852|115|1|Last 1pc Stk in JPN >> DELIVERY 2-3wks ARO|Y
01|182852|115|2|New production delivery >> 14-15wks ARO|Y
01|182852|115|3|PLEASE NOTE: SKJ25-24C is a non stock tool. Once an|Y
01|182852|115|4|order is placed it cannot be cancelled or returned.|Y
01|182852|117|1|SKJ25-24.5C >> SK20/SK25 Coolant Cap 24.5mm|Y
01|182852|117|2|PLEASE NOTE: SKJ25-24.5C is a non stock tool. Once an|Y
01|182852|117|3|order is placed it cannot be cancelled or returned.|Y
01|182857|12|1|special x4 port manifold block to actuate both spindles|Y
01|182857|12|2|independently.|Y
01|182857|13|1|Hyd Hoses and Fittings|Y
01|182857|13|2|mounting block for Hydrualic hand levers|Y
01|182870|1|1|RGA#TAR-58531|Y
01|182870|1|2|5AX-201YA|Y
01|182880|5|1|Installation Includes: Drive Unit Short bar fiber opt|Y
01|182880|5|2|cable bulkhead cables external cables parameter|Y
01|182880|5|3|changes service time & travel|Y
01|182883|3|1|External cables for hooking table to machine tool.|Y
01|182883|3|2|**CUSTOMER MUST SUPPLY NEEDED LENGTH**|Y
01|182883|4|1|This includes travel and labor for putting new table on|Y
01|182883|4|2|machine hooking up to existing interface setting zero|Y
01|182883|4|3|and new parameters.  Net Cost.|Y
01|182885|1|1|BMT65-CAPTO4X-ICE  - Mimatic Part # 197602|Y
01|182885|1|2|Straight Unit BMT65 Capto C4IC 1:1 L=65  S1=112|Y
01|182885|2|1|BMT65-CAPT04Z-ICE - Mimatic part # 197603|Y
01|182885|2|2|Angle Unit BMT65 Capto C4IC 1:1 L1=72|Y
01|182885|3|1|Special of Dual output ben working on quote.|Y
01|182902|3|1|Riser plate for CNC501YA-M|Y
01|182902|4|1|Adapter Plate between CNC501 and CNC260 with cable|Y
01|182902|4|2|access.|Y
01|182902|5|1|Adapter plate between hydraulic cylinder and CNC260|Y
01|182917|34|1|Please Note: NBT30-FMH27-60-45 is non standard stock.|Y
01|182917|34|2|Once a purchase order is placed it cannot be cancelled|Y
01|182917|34|3|or returned.|Y
01|182927|1|1|Req. INS/For stock *Last Purchased in 2016|Y
01|182947|2|1|Power and Feedback cables from the Nikken Table to|Y
01|182947|2|2|the Machine Bulkhead|Y
01|182949|1|1|RGA#LVR-58599/|Y
01|182949|1|2|Repair of BMT65-ER32X-ICE s/n:77816 03|Y
01|182949|1|3|(Mimatic#186490)|Y
01|182949|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|182949|2|2|1 spindle.|Y
01|182968|1|1|Includes motor and cables|Y
01|182968|1|2|3rd party software required|Y
01|182990|1|1|Drawing sent for customer to confirm if item is correct|Y
01|182998|1|1|Tool # CS-027-090-001 for Sikorsky|Y
01|182998|3|1|Quoted at NET Price|Y
01|183002|1|1|RGA#LVR-58534/|Y
01|183002|1|2|Repair of OKEX-ER32X s/n:AL0512 (Alps#OKA00-19000)|Y
01|183002|2|1|Bearings o-rings collet nut and spindle to be|Y
01|183002|2|2|replaced. If the spindle can be reused the cost will|Y
01|183002|2|3|be $848.40|Y
01|183034|2|1|Once modification process has started order cannot be|Y
01|183034|2|2|cancelled or returned|Y
01|183065|1|1|Modified installation package. Toyoda to provide AMP|Y
01|183065|1|3|Lyndex-Nikken to provide: External cables from junction|Y
01|183065|1|4|box to the table pluming from junction box to table|Y
01|183065|1|5|parameter settings service time and travel.|Y
01|183084|1|1|MBT40-C32-120 MBT40 3 Lock 32mm Milling Chuck 8000rpm|Y
01|183084|2|1|NBT40-C32-135  NBT40 Dual Contact 32mm Milling Chuck|Y
01|183084|2|2|8000rpm|Y
01|183089|2|1|CNCZ321MA Inspection Fee|Y
01|183089|2|2|If order a repair or new table we will deny this cost.|Y
01|183089|12|1|Special Plate for Oil change|Y
01|183089|13|1|SP Plate Installtion Cost & Oil Change Cost|Y
01|183089|13|2|Not Including Oil Cost.|Y
01|183100|3|1|1000PSI MAX|Y
01|183100|4|1|3000PSI MAX|Y
01|183104|1|1|Tool #1 #9 #27 #29 #60 #44 #35 #57 #51 #45|Y
01|183104|1|2|#39 #10|Y
01|183104|1|3|Net price includes the following parts for assembly:|Y
01|183104|1|4|HSK63-TUBE|Y
01|183104|2|1|Customer providing balluf chip to be installed on|Y
01|183104|2|2|holders|Y
01|183104|3|1|Coolant tube installed|Y
01|183104|13|1|Tool #8 #34 #58|Y
01|183104|13|2|Net price includes the following parts for assembly:|Y
01|183104|13|3|HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|183104|14|1|Customer providing balluf chip to be installed on|Y
01|183104|14|2|holders|Y
01|183104|15|1|HS coolant nut installed included in price of holders|Y
01|183104|16|1|Coolant back-up screw and coolant tube installed|Y
01|183105|1|1|**Does not have Makino Drive Pins|Y
01|183105|3|1|**Does not have Makino Drive Pins|Y
01|183111|8|1|This item is considered special once ordered it cannot|Y
01|183111|8|2|be cancelled or returned.|Y
01|183111|8|3|Net price has been quoted and no further discount|Y
01|183111|8|4|should be taken.|Y
01|183111|10|1|Lyndex Part # MZMP46-ER25Y-MD-ICE Ref Mim #102771|Y
01|183111|10|2|2 pc - $8876.00 net ea|Y
01|183111|10|3|3 pc - $6464.00 net ea|Y
01|183111|10|4|This item is considered special once ordered it cannot|Y
01|183111|10|5|be cancelled or returned.  Net price has been quoted|Y
01|183111|10|6|no further discount should be taken|Y
01|183113|25|1|10 pcs - 5/16 - 1 hand and 3 pcs - 1/4 - 1/2 pipe|Y
01|183124|2|1|This size will be available a bit sooner|Y
01|183124|4|1|Wrench if they do not already have|Y
01|183126|1|1|Reusing Customer's Servo Motor and Electronics|Y
01|183126|1|2|New Cables Will Be Needed|Y
01|183126|2|1|Reusing Customer's Servo Motor and Electronics|Y
01|183126|2|2|New Cables Will Be Needed|Y
01|183126|3|1|External Cables for connecting table to machine tool|Y
01|183126|3|2|**CUSTOMER MUST SUPPLY NEEDED LENGTH**|Y
01|183126|4|1|This includes travel and labor for putting new table on|Y
01|183126|4|2|machine hooking up to existing interface setting zero|Y
01|183126|4|3|and new parameters. Net Cost|Y
01|183129|1|1|Reusing Customer's Servo Motor and Electronics|Y
01|183129|1|2|New Cables Will Be Needed|Y
01|183129|2|1|Reusing Customer's Servo Motor and Electronics|Y
01|183129|2|2|New Cables Will Be Needed|Y
01|183129|3|1|External Cables for connecting table to machine tool|Y
01|183129|3|2|**CUSTOMER MUST SUPPLY NEEDED LENGTH**|Y
01|183129|4|1|This includes travel and labor for putting new table on|Y
01|183129|4|2|machine hooking up to existing interface setting zero|Y
01|183129|4|3|and new parameters. Net Cost|Y
01|183131|2|1|NBT30-HC25-110|Y
01|183131|2|2|Bt30 2Lock Hydraulic Chuck 110mm GL|Y
01|183138|1|1|RGA#LVR-58549/|Y
01|183138|1|2|Repair of 180196 s/n:71516 02|Y
01|183138|2|1|Bearings seals o-rings and damaged output spindle to|Y
01|183138|2|2|be replaced. Recondition 1 input spindle.|Y
01|183152|1|1|for IMTS display.|Y
01|183152|1|2|after IMTS this RT should be returned.|Y
01|183171|10|1|INCLUDES 2 EIGHT HOUR DAYS FOR INSTALLATION|Y
01|183171|10|2|AND TRAINING.|Y
01|183173|1|1|Tool #10 #9 #22 #26 #18 #27 #51 #60 #44 #39|Y
01|183173|1|2|#57 #43|Y
01|183173|1|3|Net price includes the following parts for assembly:|Y
01|183173|1|4|HSK63-TUBE|Y
01|183173|2|1|Customer providing balluf chip to be installed in|Y
01|183173|2|2|holders|Y
01|183173|3|1|Coolant tube installed|Y
01|183173|10|1|Tool #6 #7 #8 #24 #58|Y
01|183173|10|2|Net price includes the following parts for assembly:|Y
01|183173|10|3|HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|183173|11|1|Customer providing balluf chip to be installed on|Y
01|183173|11|2|holders|Y
01|183173|12|1|HS coolant nut installed included in price of holders|Y
01|183173|13|1|Coolant back-up screw and coolant tube installed|Y
01|183177|2|1|A2-8 adapter plate for HW-10C-COL|Y
01|183180|3|1|HSK63A-MDSK20-120|Y
01|183180|3|2|HSK63A SK20 Major Dream 15000rpm|Y
01|183180|7|1|NBT50-MDSK20-135|Y
01|183180|7|2|NBT50 Dual Contact SK20 Major Dream 15000rpm|Y
01|183181|1|1|Tool #6 #7 #48 #20 #18 #9 #11 #54|Y
01|183181|1|2|Net price includes the following parts for assembly:|Y
01|183181|1|3|HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|183181|2|1|Customer providing balluf chip to be installed on|Y
01|183181|2|2|holders|Y
01|183181|3|1|HS coolant nut installed included in price of holders|Y
01|183181|4|1|Coolant back-up screw and coolant tube installed|Y
01|183181|12|1|Tool #22 #26 #18 #42 #60 #44 #29 #31 #27 #13|Y
01|183181|12|2|#1|Y
01|183181|12|3|Net price includes the following parts for assembly:|Y
01|183181|12|4|HSK63-TUBE|Y
01|183181|13|1|Customer providing balluf chip to be installed in|Y
01|183181|13|2|holders|Y
01|183181|14|1|Coolant tube installed|Y
01|183181|26|1|Tool #2|Y
01|183181|26|2|Net price includes the following parts for assembly:|Y
01|183181|26|3|HSK63-TUBE SKN-25BJ(GH) SKG-28-J|Y
01|183181|27|1|Customer providing balluf chip to be installed in|Y
01|183181|27|2|holders|Y
01|183181|28|1|HS coolant nut installed included in price of holders|Y
01|183181|29|1|oolant back-up screw and coolant tube installed|Y
01|183183|2|1|Non-refundable Non-cancellable|Y
01|183185|1|1|BMT55-BG12Z-C-100|Y
01|183185|1|2|BMT55 Static BG1.1/4 Z-Axis 90Deg<Axial> IntExtCoolant|Y
01|183185|1|3|100mm CENTER HEIGHT|Y
01|183185|1|4|APPROVAL OF DRAWINGS NEEDED BEFORE PRODUCTION CAN BEGIN|Y
01|183185|1|5|Holdwell Quote#220801|N
01|183185|3|1|BMT55-BG12Z-C-100|Y
01|183185|3|2|BMT55 Static BG1.1/4 Z-Axis 90Deg<Axial> IntExtCoolant|Y
01|183185|3|3|100mm CENTER HEIGHT|Y
01|183185|3|4|APPROVAL OF DRAWINGS NEEDED BEFORE PROUCTION CAN BEGIN|Y
01|183185|3|5|Holdwell Quote#220801|N
01|183192|1|1|C5005-0875-5.66 was discontinued closest match quoted|Y
01|183192|4|1|C50S5-1375-5.75 was discontinued closest match quoted|Y
01|183198|2|1|SAME AS E346+ BUT ALSO HAS VACUUM CLAMPING FOR CAT50|Y
01|183199|5|1|Installation includes:Dual axis drive unit short bar|Y
01|183199|5|2|fiber optic cables communications cables bulkhead|Y
01|183199|5|3|cables external cablesparameter changes service|Y
01|183199|5|4|time and travel.|Y
01|183201|7|1|HSK63A-SK16C-180-J-IDU|Y
01|183201|7|2|HSK63A SK16 Slim Chuck Coolant IdChipHole 15000rpm|Y
01|183201|7|3|Special Gage Length 180mm with Coolant Nut (SKN-16BJ)|Y
01|183201|11|1|HSK63A-SK16C-180-J-IDU|Y
01|183201|11|2|HSK63A SK16 Slim Chuck Coolant IdChipHole 15000rpm|Y
01|183201|11|3|Special Gage Length 180mm with Coolant Nut (SKN-16BJ)|Y
01|183201|16|1|S32-SK16-250-J|Y
01|183201|16|2|Straight Shank Extension OD32mm SK16 Slim Chuck|Y
01|183201|16|3|with Coolant Nut (SKN-16BJ)|Y
01|183201|17|1|CKFN32-32DC|Y
01|183201|17|2|CCK Coolant Seal Nut/Cap OD32mm ID32? Direct Mount|Y
01|183201|21|1|CKFN32-32DC|Y
01|183201|21|2|CCK Coolant Seal Nut/Cap OD32mm ID32? Direct Mount|Y
01|183203|5|1|STAND/TABLE FOR PRESETTER WITH SPINDLE HOLDERS|Y
01|183205|5|1|STAND/TABLE FOR PRESETTER WITH SPINDLE HOLDERS|Y
01|183207|1|1|Includes Shrink fit pots & 10 Standard Holders|Y
01|183207|2|1|Included with Fi6 Shrink Fit Package|Y
01|183207|3|1|Included with Fi6 Shrink Fit Package|Y
01|183207|4|1|Included with Fi6 Shrink Fit Package|Y
01|183207|6|1|Vitex Extrusion has the unit at their facility.|Y
01|183207|6|2|Discount reflects used machine and is non returnable|Y
01|183207|6|3|Once order is placed.|Y
01|183212|2|1|Includes 4th&5th axis interfaceto machine bulkhead|Y
01|183212|2|2|Includes Power and Feed Back Cables from Nikken Table|Y
01|183212|2|3|to the Machine Bulkhead|Y
01|183212|2|4|Includes Travel & Labor|Y
01|183216|2|1|5% extra discount has been applied to this quote|Y
01|183217|1|1|T#1|Y
01|183217|2|1|T#1|Y
01|183217|3|1|T#2|Y
01|183217|4|1|T#2|Y
01|183217|5|1|T#4|Y
01|183217|6|1|T#4|Y
01|183217|7|1|T#6|Y
01|183217|8|1|T#6|Y
01|183217|9|1|T#7|Y
01|183217|10|1|T#7|Y
01|183217|11|1|T#9|Y
01|183217|12|1|T#10|Y
01|183217|13|1|T#10|Y
01|183217|14|1|T#11|Y
01|183217|15|1|T#11|Y
01|183217|16|1|T#12|Y
01|183217|17|1|T#12|Y
01|183217|18|1|T#13|Y
01|183217|19|1|T#15|Y
01|183217|20|1|T#15|Y
01|183217|21|1|T#16|Y
01|183217|22|1|T#16|Y
01|183217|23|1|T#18|Y
01|183217|24|1|T#18|Y
01|183217|25|1|T#19|Y
01|183217|26|1|T#19|Y
01|183217|27|1|T#20|Y
01|183217|28|1|T#20|Y
01|183217|29|1|T#21|Y
01|183217|30|1|T#21|Y
01|183217|31|1|T#23|Y
01|183217|32|1|T#23|Y
01|183217|33|1|T#24|Y
01|183217|34|1|T#24|Y
01|183217|35|1|T#25|Y
01|183217|36|1|T#25|Y
01|183217|37|1|T#27|Y
01|183217|38|1|T#27|Y
01|183217|39|1|T#28|Y
01|183217|40|1|T#28|Y
01|183218|1|1|Tool #05 #22|Y
01|183218|1|2|Net price includes the following parts for assembly:|Y
01|183218|1|3|HSK63-TUBE SKN-25BJ(GH) SKG-28-J|Y
01|183218|2|1|Customer providing balluf chip to be installed|Y
01|183218|2|2|balance included in price of toolholders|Y
01|183218|3|1|HS coolant nut installed included in price of holders|Y
01|183218|4|1|Coolant back-up screw and coolant tube installed|Y
01|183218|6|1|Tool #1 #2 #3 #4 #6 #7 #8 #9 #10 #11 #16|Y
01|183218|6|2|#17 #18 #19 #20 #21|Y
01|183218|6|3|Net price includes the following parts for assembly:|Y
01|183218|6|4|HSK63-TUBE|Y
01|183218|7|1|Customer providing balluf chip to be installed on|Y
01|183218|7|2|holders|Y
01|183218|8|1|Coolant tube installed|Y
01|183218|21|1|Tool #12 #13 #14|Y
01|183218|21|2|Net price includes the following parts for assembly:|Y
01|183218|21|3|HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|183218|22|1|Customer providing balluf chip to be installed on|Y
01|183218|22|2|holders|Y
01|183218|23|1|HS coolant nut installed|Y
01|183218|24|1|Coolant back-up screw and coolant tube installed|Y
01|183218|27|1|Tool #15|Y
01|183218|27|2|Net price includes the following parts for assembly:|Y
01|183218|27|3|HSK63-Tube SKN-16BJ(GH) SKG16-12HG|Y
01|183218|28|1|Customer providing balluf chip to be installed on|Y
01|183218|28|2|holders|Y
01|183218|29|1|HS coolant nut installed included in price of holders|Y
01|183218|30|1|Coolant back-up screw and coolant tube installed|Y
01|183230|3|1|Included with R-8-SP-SET for NCT200EFA-M|Y
01|183252|5|1|Use for the requested Metric sizes|Y
01|183254|1|1|Please Note: This tap collet is non standard stock.|Y
01|183254|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|183254|1|3|or returned.|Y
01|183257|5|1|**if standard speed holder|Y
01|183257|6|1|**if hi-speed smooth nut on holder|Y
01|183266|11|1|Alternative for C5007-0020-6.00|Y
01|183266|13|1|Alternative to C5007-0025-6.00|Y
01|183268|2|1|For balancing customer supplied set screws on endmill|Y
01|183268|2|2|2-5 pc $33 net ea.|Y
01|183268|2|3|5+ pcs $27 net ea.|Y
01|183271|1|1|RGA#LVR-58643/|Y
01|183271|1|2|Repair of MNL12-ER40Z s/n:A0097 (Alps#T32214)|Y
01|183271|2|1|Bearings o-rings and collet nut to be replaced.|Y
01|183272|2|1|wrench for 1 mill  chuck|Y
01|183272|4|1|Quoted SK25 in place of SK20 for better stock avail|Y
01|183272|5|1|wrench for 3/4 mill chuck and SK25 slim chuck|Y
01|183272|6|1|special item not cancelable nor returnable|Y
01|183272|11|1|wrench for SK25 holders|Y
01|183275|2|1|For balancing customer supplied set screws on endmill|Y
01|183275|2|2|2-5 pc $33 net ea.|Y
01|183275|2|3|5+ pcs $27 net ea.|Y
01|183289|1|1|RGA#LVR-58582/|Y
01|183289|1|2|Repair of NK103-12000 s/n:AL0037 (Alps#NK103-12002)|Y
01|183289|2|1|Bearings o-rings collet nut and spindle to be|Y
01|183289|2|2|replaced. If the spindle can be reused the cost will|Y
01|183289|2|3|be $1822.80|Y
01|183291|1|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|183291|2|1|1st batch/920144/MorrisMW/Atlas Fibre|Y
01|183291|3|1|1st batch/920144/MorrisMW/Atlas Fibre|Y
01|183293|7|1|Standard 7Mpa (1000 PSI MAX PRESSURE)|Y
01|183294|1|1|Customer must use something to isolate the rotary table|Y
01|183294|1|2|from the current flowing through the parts and fixtures|Y
01|183324|2|1|CAT50-Z38-187-IDU|Y
01|183345|1|1|Discount reflects an order of 1~5 toolholders.|Y
01|183345|2|1|Discount reflects an order of 6~19 toolholders.|Y
01|183347|2|1|NBT30-SK13C-60-J|Y
01|183347|2|2|NBT30 Dual Contact SK13 Slim Chuck Coolant 15000rpm|Y
01|183347|2|3|with Coolant Nut|Y
01|183347|3|1|NBT30-SK13C-75-J|Y
01|183347|3|2|NBT30 Dual Contact SK13 Slim Chuck Coolant 15000rpm|Y
01|183347|3|3|with Coolant nut|Y
01|183350|1|1|1st Batch|Y
01|183363|1|1|HW-10C-COL w/A2-8 adaptor HOWA # H05M10A8Lyndex part#|Y
01|183363|1|2|to be determined.|Y
01|183363|1|3|NET EA Price ETA approx middle of October|Y
01|183363|1|4|Item is a special Non cancelable|Y
01|183363|1|5|& non returnable once order is placed.Drawing approval|Y
01|183363|1|6|will need to be sighed.|Y
01|183365|8|1|This item is considered special once ordered it cannot|Y
01|183365|8|2|be cancelled or returned.|Y
01|183365|8|3|Net price has been quoted no further discount should|Y
01|183365|8|4|be taken.|Y
01|183365|10|1|Lyndex Part # MZMP46-ER25Y-MD-ICE Ref Mim #102771|Y
01|183365|10|2|2 pc - $8193.00 net ea|Y
01|183365|10|3|3 pc - $5967.00 net ea|Y
01|183365|10|4|This item is considered special once ordered it cannot|Y
01|183365|10|5|be cancelled or returned.|Y
01|183365|10|6|Net price has been quoted no further discount should|Y
01|183365|10|7|be taken|Y
01|183381|1|1|Discount reflects a purchase order of 1~12 toolholders.|Y
01|183381|2|1|Discount reflects a purchase order of 13+ toolholders.|Y
01|183384|1|1|Please Note: This tap collet is non standard stock.|Y
01|183384|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|183384|1|3|or returned.|Y
01|183385|1|1|Special item non cancelable nor returnable|Y
01|183385|2|1|Optional service to adjust draw thread per customer|Y
01|183385|2|2|specs.|Y
01|183385|2|3|Net each charge no additional discount|Y
01|183399|1|1|Bringing in from our factory|Y
01|183403|17|1|W20M5-0562-1.54  Compression/Tension Tap Holder|N
01|183406|1|1|SK10-9.5AC|Y
01|183406|1|2|SK10 9.5mm On-Size Mechanically Sealed Collet|Y
01|183406|1|3|This item is speical MOQ = 10 pcs once ordered it|Y
01|183406|1|4|cannot be cancelled or returned.|Y
01|183409|17|1|W20M5-0562-1.54  Compression/Tension Tap Holder|N
01|183415|4|1|3% added for x10 or more holders|Y
01|183415|5|1|3% added for x10 or more holders|Y
01|183420|42|1|Soraluce TA-25 Bed Mill|Y
01|183421|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|183421|9|1|STEP DRILLS|Y
01|183432|1|1|RGA#TAR-58609|Y
01|183432|1|2|5AX-200IIFA-M|Y
01|183439|1|1|RGA#CUR-58605/|Y
01|183439|1|2|Repair of C8-MRAM-IC s/n:65161 01 (Mimatic#162821)|Y
01|183439|2|1|Bearings seals o-rings and coolant sealing system to|Y
01|183439|2|2|be replaced.|Y
01|183439|4|1|RGA#CUR-58605/|Y
01|183439|4|2|Reapir of MRAM-MI40L-IC s/n:65611 02 (Mimatic#159995)|Y
01|183439|5|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|183439|5|2|1 output spindle|Y
01|183439|7|1|RGA#CUR-58605/|Y
01|183439|7|2|Repair of PA110-CAT sn:n/a (Mimatic#162745)|Y
01|183439|8|1|Missing bolts & o-ring to be replaced|Y
01|183470|4|1|Price reduced to reflect non-stock CAT40-SK20-65U-IDU|Y
01|183475|1|1|Discount reflects non returnable tooling.|Y
01|183476|1|1|1st Batch *DWG saved in Team's file.|Y
01|183476|2|1|1st Batch *DWG saved in Team's file.|Y
01|183476|3|1|1st Batch *DWG saved in Team's file.|Y
01|183479|2|1|Table to be prepped and configured to match table in|Y
01|183479|2|2|for repair RGA#TAR58609.  Special Service offer for new|Y
01|183479|2|3|replacement.|Y
01|183483|1|1|Repeat order. This is to replace one they crashed|Y
01|183493|1|1|Custom ATC-ALIGN-HSK63A per drawings sent by Mazak.|Y
01|183493|1|2|Once PO is received a new part number will be created|Y
01|183493|1|3|for this piece.|Y
01|183493|1|4|Price quoted is NET COST EACH and based on a 10 or 20pc|Y
01|183493|1|5|quantity ordered on PO at once.|Y
01|183497|1|1|3ea avail at factory as hi speed to bring in to convert|Y
01|183497|1|2|Told Trip if more than 3ea needed call  back for ETA|Y
01|183500|1|1|Req. INS/Install E16-NUT & ER16-SCREW(C)|Y
01|183500|2|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|183501|1|1|Part # BMT75-ER40X|Y
01|183501|3|1|Part # BMT75-ER40Z-90|Y
01|183501|4|1|Part # BMT75-ER40Z-90-ICE|Y
01|183501|5|1|BMT75-ER40Z-ICE-90|Y
01|183505|2|1|TCE-A3043/2|Y
01|183505|2|2|Direct monut power cable|Y
01|183505|3|1|TCE-94828/1|Y
01|183505|3|2|Direct mount feedback cable|Y
01|183506|5|1|CNC180LFA match s/n.15972 W/O groove and extra work|Y
01|183506|6|1|TCE-A3016/4|Y
01|183506|6|2|Direct monut power cable|Y
01|183506|7|1|TCE-94828/1|Y
01|183506|7|2|Direct mount feedback cable|Y
01|183508|10|1|TCE-A3043/TCE-94200 Cable set|Y
01|183511|11|1|Alternative for CAT40-ER20-2.76|Y
01|183517|1|1|With pull stud PSN100VE|Y
01|183517|1|2|Special item not cancelable nor returnable once ordered|Y
01|183517|1|3|NET ea price with no additional discount|Y
01|183517|2|1|Price built into holder cost|Y
01|183517|3|1|With pull stud PSN100VE|Y
01|183517|3|2|Special item not cancelable nor returnable once ordered|Y
01|183517|3|3|Net ea price no additional discount|Y
01|183517|4|1|Price built into holder cost|Y
01|183546|3|1|CAT50-Z38-187U-IDU|Y
01|183546|3|2|CAT50 Z38 Tap Holder with 187mm gage length|Y
01|183546|3|3|*Special - this cannot be cancelled or returned|Y
01|183557|1|1|ST32-COMZ45-120|Y
01|183557|1|2|Combat Z Drill|Y
01|183558|1|1|Please allow 4 to 5 weeks ARO|Y
01|183558|2|1|Please allow 8 weeks delivery ARO|Y
01|183558|3|1|Only required for the 5AX-250 unless they would like|Y
01|183558|3|2|to go with hydraulic brake on the 5AX-201|Y
01|183570|3|1|5% extra discount has been applied to this quote|Y
01|183578|1|1|H63A-SF0375-6.175P HSK63A 3/8 SF Holder 6.175 GL|Y
01|183578|1|2|Net Price is quoted. No further Discount allowed.|Y
01|183579|1|1|Okuma Live; ER25 FIXED 45DEG Head; 1:1 Gear Max 30Nm;|Y
01|183579|1|2|10K RPM|Y
01|183579|1|3|Ref Drwg#00055388  Mim 102771 will change on order|Y
01|183579|1|4|Okuma LB3000|Y
01|183583|1|1|RGA#TOR-58648/|Y
01|183583|1|2|Repair of CAT40-C3/4-70U-IDU|Y
01|183625|18|1|HSK50E-SK13-70P|Y
01|183625|19|1|HSK50E-SK13-90P|Y
01|183631|1|1|Net price including chip hole and chip install price.|Y
01|183631|1|2|Customer providing RFID Chips|Y
01|183631|3|1|Net price including chip hole and chip install price.|Y
01|183631|3|2|Customer providing RFID Chips|Y
01|183631|5|1|Net price including chip hole and chip install price.|Y
01|183631|5|2|Customer providing RFID Chips|Y
01|183631|7|1|Net price including chip hole and chip install price.|Y
01|183631|7|2|Customer providing RFID Chips|Y
01|183644|6|1|EXTERNAL POWER/FEEDBACK CABLES 4TH/5TH AXES|Y
01|183644|7|1|HYDRAULIC MANIFOLDS PRESSURE REGULATORS FOR AIR/HYD|Y
01|183649|1|1|RGA#QUA-58635/|Y
01|183649|1|2|Repair of MNL12-ER32Z s/n:A4330 (Alps#T32207)|Y
01|183649|2|1|Bearings o-rings collet nut and spindle to be|Y
01|183649|2|2|replaced. If spindle can be reused the cost will be|Y
01|183649|2|3|$1608.80|Y
01|183651|1|1|Onetime Test-discount provided: non-returnable|Y
01|183651|2|1|Onetime Test-discount provided: non-returnable|Y
01|183651|3|1|Onetime Test-discount provided: non-returnable|Y
01|183651|6|1|Onetime Test-discount provided: non-returnable|Y
01|183655|2|1|Please Note: These toolholders are non standard stock.|Y
01|183655|2|2|Once a purchase order is placed it cannot be cancelled|Y
01|183655|2|3|or returned.|Y
01|183655|14|1|Please Note: These toolholders are non standard stock.|Y
01|183655|14|2|Once a purchase order is placed it cannot be cancelled|Y
01|183655|14|3|or returned.|Y
01|183689|2|1|H63F-SF0187-3.15  HSK63F Shrink Fit Holder 3/16|Y
01|183693|1|1|RGA#LVR-58650/|Y
01|183693|1|2|Repair of BMT45-ER25X-ICE s/n:20900744 06|Y
01|183693|1|3|(Mimatic#188040)|Y
01|183693|2|1|Bearings seals and o-rings to be replaced.|Y
01|183706|3|1|CUSTOM ADAPTER PLATE FOR WORKHOLDING MOUNT|Y
01|183706|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|183724|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|183726|3|1|CUSTOM ADAPTER PLATE FOR SCHUNK KS160 2 JAW VISE|Y
01|183726|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|183729|8|1|Quoted as an in stock option.|Y
01|183731|1|1|Final Part Number: CAT40-VC13F-90U-IDU-M|Y
01|183733|5|1|New replacement for ZKN12-6|Y
01|183733|10|1|NK32-25|Y
01|183733|13|1|New replacement for ZKN12-5|Y
01|183733|14|1|New replacement for ZK12-1/4U|Y
01|183733|15|1|NK32-MT2-105|Y
01|183733|16|1|NK32-MT2-15|Y
01|183744|3|1|Two machines to be installed at the same time.|Y
01|183754|1|1|P/N: BMT65-C4X-ICE|Y
01|183754|1|2|BMT65 Capto C4 Straight; Internal Coolant; 1:1 Ratio|Y
01|183754|1|3|L=65 S1=112|Y
01|183754|1|4|Ref#197602|Y
01|183754|2|1|P/N: BMT65-C4Z-72-ICE|Y
01|183754|2|2|BMT65 Capto C4 Angle Unit; Internal Coolant; 1:1 Ratio|Y
01|183754|2|3|L1=72|Y
01|183754|2|4|Ref#197603|Y
01|183754|6|1|P/N: BMT65-C4-FA45-ICE|Y
01|183754|6|2|BMT65 Capto C4; 45 DEG ANGLE; Internal Coolant;|Y
01|183754|6|3|1:1 Ratio;|Y
01|183754|6|4|Ref# 102771 Drwg# 00055388|Y
01|183754|6|5|APPROVAL DRAWING REQUIRED|Y
01|183762|1|1|This toolholder has the Makino pins already installed.|Y
01|183776|16|1|Special/Modified:  Standard CAT40 22mm Shell Mill|Y
01|183776|16|2|holder with 50mm projection.|Y
01|183776|16|3|Coolant Ports|Y
01|183776|16|4|Modified 2-holes- DIN coolant through the flange|Y
01|183776|16|5|DIN holes and coolant ports are not pluggable|Y
01|183776|16|6|new part# C4001-22-50CP-DIN-M|Y
01|183776|16|7|This is a modified holder. Once a PO has been issued|Y
01|183776|16|8|it cannot be cancelled or returned.|Y
01|183781|1|1|Discount is based upon a purchase of 1~3 holders.|Y
01|183781|1|2|If MSC purchases 4~6 holders your discount will be 37%.|Y
01|183791|4|1|Delivery: 5 days delivery after design is complete and|Y
01|183791|4|2|approved.|Y
01|183808|2|1|Lyndex-Nikken to make block.|Y
01|183808|2|2|Delivery is based on information of spindle drawing|Y
01|183808|2|3|*Net price|Y
01|183821|8|1|alternative for HSK63A-ER25S-150|Y
01|183821|8|2|Bearing Nut Style|Y
01|183825|3|1|In stock version in shorter length|Y
01|183828|1|1|SA3080-ER25Z-RH-55-ICE|Y
01|183828|1|2|Sauter DIN5480 VDI30 Live ER25 Z-Axis 90Deg RH IntExtC|Y
01|183828|1|3|7MP 55mm CENTER HEIGHT|Y
01|183828|1|4|Quoted at NET pricing|Y
01|183828|2|1|Quoted at NET pricing|Y
01|183829|2|1|2ea pots are included with unit|Y
01|183841|2|1|3P RJ CYLINDER TYPE|Y
01|183845|1|1|RGA#CUR-58652/|Y
01|183845|1|2|Repair of MRAM-MI32 s/n:65605 02 (Mimatic#178045)|Y
01|183845|2|1|Bearings seals o-rings and MI32 spindle to be|Y
01|183845|2|2|replaced.|Y
01|183855|4|1|3 items above make up the coolant  for thru the tool|Y
01|183855|4|2|option|Y
01|183858|1|1|Includes: Shrink Fit Unit Cooling Station Induction|Y
01|183858|1|2|Ring Set Cooling Bracket Set Storage Rack and (2)|Y
01|183858|1|3|Chuck Holders of Choice (CAT40 CAT50 HSK63...)|Y
01|183858|2|1|Includes: Shrink Fit Unit Cooling Station Induction|Y
01|183858|2|2|Ring Set Cooling Bracket Set Storage Rack and (2)|Y
01|183858|2|3|Chuck Holders of Choice (CAT40 CAT50 HSK63...)|Y
01|183859|2|1|ITEM# 169209 Reaming Holder Type RPS400 J5xD L140|Y
01|183859|2|2|L1=68 Shaft-O 16 mm DIN 1835 HA (plain-shaft)|Y
01|183859|2|3|NET Price|Y
01|183859|3|1|ITEM# 169210  Reamer holder Typ RPS400 3xD L=125 L1=50|Y
01|183859|3|2|Shaft 20 mm DIN 1835 HA|Y
01|183859|3|3|NET PRICE|Y
01|183859|6|1|ITEM# 169490  D=12mm H7 Reaminghead  RPK42J LBG11|Y
01|183859|6|2|flutes left-hand helix coating TINAMATIC 3|Y
01|183859|6|3|NET PRICE|Y
01|183859|7|1|ITEM# 169494  D=14mm H7 Reaminghead RPK40M LBG11|Y
01|183859|7|2|flutes left-hand helix coating TINAMATIC 3|Y
01|183859|7|3|NET PRICE|Y
01|183859|8|1|ITEM# 169498  D=16mm H7 Reaminghead type RPK42J LBG 11|Y
01|183859|8|2|Tinamatic 3 left hand fluted|Y
01|183859|8|3|NET PRICE|Y
01|183859|9|1|ITEM# 169502  D=18mm H7 Reaminghead Typ RPK42|Y
01|183859|9|2|left hand twist   Tinamatic|Y
01|183859|9|3|NET PRICE|Y
01|183859|10|1|ITEM# 169506  D=20mm H7 Reaminghead Typ RPK42|Y
01|183859|10|2|left hand twist   Tinamatic|Y
01|183859|10|3|NET PRICE|Y
01|183870|2|1|HSK100A-C20-135 HSK100A 20mm Milling Chuck 8000rpm|Y
01|183870|2|2|135mm Gage Length|Y
01|183878|1|1|Note: Discontinued model tooling certificate is not|Y
01|183878|1|2|included|Y
01|183880|1|1|1pc pricing|Y
01|183880|1|2|*2-4pc pricing:  $14034.00ea NET|Y
01|183880|1|3|*5pc+ pricing:   $10329.00ea NET|Y
01|183882|3|1|Replaces N-42|Y
01|183882|4|1|Replaces N-25|Y
01|183891|1|1|PLEASE NOTE:ZKG16-3/4U is a non stock item. Once an|Y
01|183891|1|2|order is placed it cannot be cancelled or returned.|Y
01|183908|1|1|2pc $5090.00 Ea/Net|Y
01|183908|1|2|1pc $7744.00 Ea/Net|Y
01|183908|8|1|2pc|Y
01|183908|8|2|4pc|Y
01|183934|1|1|Replacement for Lyndex-Nikken RGA: LVR-58582|Y
01|183935|1|1|P/N: TBD  BMT65-ER25-AD-ICE|Y
01|183935|1|2|BMT65 ER25 STRT Adjustable +/- 107 Deg Internal Coolant|Y
01|183935|1|3|External Coolant; 7MP|Y
01|183935|1|4|Mim# 193136|Y
01|183936|8|1|Delivery: 1 Stk/ 5-pc due 09/02 / 2-pc 3~4 weeks|Y
01|183937|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|183937|9|1|** Closeout Promotion! All sales are FINAL!**|Y
01|183938|1|1|This is a non standard stock item and is considered|Y
01|183938|1|2|special once ordered it cannot be cancelled or|Y
01|183938|1|3|returned.|Y
01|183943|1|1|Item is non-standard stock once a PO is received it|Y
01|183943|1|2|can not be canceled or returned|Y
01|183943|1|3|e|N
01|183954|2|1|Alternative to HSK63A-FMH25.4-70-90|Y
01|183954|15|1|Alternative for HSK63A-Z12-120|Y
01|183954|16|1|Alternative for HSK63A-Z24|Y
01|183954|16|2|e|N
01|183954|23|1|PMK8-4.8|Y
01|183965|1|1|T#1|Y
01|183965|2|1|T#1|Y
01|183965|3|1|T#2|Y
01|183965|4|1|T#2|Y
01|183965|5|1|T#4|Y
01|183965|6|1|T#4|Y
01|183965|7|1|T#6|Y
01|183965|8|1|T#6|Y
01|183965|9|1|T#7|Y
01|183965|10|1|T#7|Y
01|183965|11|1|T#9|Y
01|183965|12|1|T#10|Y
01|183965|13|1|T#10|Y
01|183965|14|1|T#11|Y
01|183965|15|1|T#11|Y
01|183965|16|1|T#12|Y
01|183965|17|1|T#12|Y
01|183965|18|1|T#13|Y
01|183965|19|1|T#15|Y
01|183965|20|1|T#15|Y
01|183965|21|1|T#16|Y
01|183965|22|1|T#16|Y
01|183965|23|1|T#18|Y
01|183965|24|1|T#18|Y
01|183965|25|1|T#19|Y
01|183965|26|1|T#19|Y
01|183965|27|1|T#20|Y
01|183965|28|1|T#20|Y
01|183965|29|1|T#21|Y
01|183965|30|1|T#21|Y
01|183965|31|1|T#23|Y
01|183965|32|1|T#23|Y
01|183965|33|1|T#24|Y
01|183965|34|1|T#24|Y
01|183965|35|1|T#25|Y
01|183965|36|1|T#25|Y
01|183965|37|1|T#27|Y
01|183965|38|1|T#27|Y
01|183965|39|1|T#28|Y
01|183965|40|1|T#28|Y
01|183980|1|1|RGA#LVR-58636:NT55-SK20Z-ICE(Mim#189211) SN:8484501|Y
01|183980|1|2|Overhaul@Mimatic Germany|Y
01|183980|1|3|*Basic Inspection Charge:JPY9070-|Y
01|183980|1|4|*Labor:JPY45330-|Y
01|183980|1|5|*Parts:JPY75840-|Y
01|183980|1|6|TOTAL JPY130240>>$972-($1=JPY134)|Y
01|183980|2|1|RGA#LVR-58636:OKEX-SK20X-ICE(Mim#188251) SN:8096904|Y
01|183980|2|2|Overhaul@Mimatic Germany|Y
01|183980|2|3|*Basic Inspection Charge:JPY9070-|Y
01|183980|2|4|*Labor:JPY22670-|Y
01|183980|2|5|*Parts:JPY100550-|Y
01|183980|2|6|Total JPY132290>>$987-($1=JPY134)|Y
01|184002|1|1|This item is a non-standard stock item and is|Y
01|184002|1|2|considered special. Once ordered it cannot be cancelled|Y
01|184002|1|3|or returned.|Y
01|184003|1|1|AC5-SHMP-10-41|Y
01|184006|5|1|Max Bore: Round 1.3/4in  Square 1.1/4in  Hex 1.1/2in|Y
01|184008|1|1|RGA#LVR-58689/|Y
01|184008|1|2|Repair of OKL3-ER32Z-ICE s/n:95949 01|Y
01|184008|1|3|(Mimatic#133711)|Y
01|184008|2|1|Bearings seals and o-rings to be replaced.|Y
01|184008|2|2|Recondition 1 spindle and make new name plate with|Y
01|184008|2|3|serial#.|Y
01|184018|2|1|PLEASE NOTE: KM2-3/4 is a non stock tool. Once an|Y
01|184018|2|2|order is placed it cannot be cancelled or returned.|Y
01|184036|1|1|IT50-C25-105|Y
01|184036|2|1|IT50-C25-135|Y
01|184036|2|2|There are currently 5 pcs in Japan which will take|Y
01|184036|2|3|2-3 weeks ARO to get them here.  If no stock at time of|Y
01|184036|2|4|order the ETA would be 16-18 weeks ARO|Y
01|184036|3|1|IT50-C25-165|Y
01|184036|3|2|16-18 weeks ARO|Y
01|184048|1|1|NB4007-0020-2.50G >> NBT40 Dual Contact ER20 Collet|Y
01|184048|1|2|Chuck|Y
01|184059|1|1|Special itemNot cancelable nor returnable|Y
01|184059|2|1|Part # CAT50-SK16-300 NET ea priceno extra discount|Y
01|184059|2|2|Special itemNot cancelable or returnable|Y
01|184059|3|1|Special itemNot cancelable nor returnable|Y
01|184059|3|2|ETA 3.5 months ARO|Y
01|184063|2|1|Meldas w/o Motor|Y
01|184067|1|1|OK107-12001M|Y
01|184067|2|1|OK107-12001S|Y
01|184067|3|1|OK107-10000|Y
01|184083|1|1|new part# C4006-32-4.00DIN-M|Y
01|184083|1|2|CAT40 End Mill Holder 32mm  w/ 4 gage length|Y
01|184083|1|3|Modified: DIN Coolant Thru the Flange|Y
01|184083|1|4|**Modified tool holder: once a PO has been issued|Y
01|184083|1|5|it cannot be cancelled or returned.|Y
01|184083|1|6|NET price|Y
01|184086|1|1|MNL12-ER25-AD-ICE >> BMT60 Live ER25 STRT Adjustable|Y
01|184086|1|2|Head with Internal and External Coolant 7MP|Y
01|184098|1|1|P/N: OKLT-SK16X-ICE|Y
01|184098|1|2|Okuma Live SK16 X-Axis<Side> BMT; IntExtCoolant|Y
01|184098|1|3|7MP; 6.5KRPM|Y
01|184098|2|1|P/N: OKLT-SK16Z-65-ICE|Y
01|184098|2|2|Okuma Live SK16 Z-Axis; 90Deg<Face> BMT IntExtCoolant|Y
01|184098|2|3|7MP; 6.5KRPM|Y
01|184115|1|1|1st Batch/For stock *4/21:DWG Approved/TR|Y
01|184116|1|1|5AX-2MT-105-120DAA21FA-M SN:8324F|Y
01|184121|1|1|RFSS-6.35-EVO|Y
01|184121|1|2|Carbide Radical Mill Reamer EVO|Y
01|184121|1|3|Qty 1-5 pcs quoted at NET pricing|Y
01|184121|2|1|RFSS-6.35-EVO|Y
01|184121|2|2|Carbide Radical Mill Reamer EVO|Y
01|184121|2|3|Qty 6-10 pcs quoted at NET pricing|Y
01|184121|3|1|RFSS-6.35-EVO|Y
01|184121|3|2|Carbide Radial Reamer EVO|Y
01|184121|3|3|Qty 10+ pcs quoted at NET pricing|Y
01|184123|1|1|250 pcs = $126 Net Each - ETA 14 Weeks ADA|Y
01|184123|1|2|500 pcs = $122 Net Each - ETA 18 Weeks ADA|Y
01|184123|1|3|1000 pcs = $118 Net Each - ETA 22 Weeks ADA|Y
01|184125|1|1|NCS-14.3F|Y
01|184125|1|2|NC Sensor Reamer DC 14.3mm|Y
01|184125|1|3|Delivery: 1mth mfg(only 1p). New lot: 2.5mth mfg|Y
01|184125|2|1|SRS-14.0-220L|Y
01|184125|2|2|Tough Cut Skill Reamer Long Type ST Shank 14.0mm|Y
01|184125|2|3|Delivery: 2mth mfg(1~3pcs) 3mth mfg(4pcs+)|Y
01|184125|3|1|BRS-14.03-250L|Y
01|184125|3|2|HSS Broach Reamer Long type ST Shank 14.03mm|Y
01|184125|3|3|Delivery: 1.5mth mfg (1-4pcs) 3mth mfg(5pcs+)|Y
01|184126|1|1|RGA#TAR-58456|Y
01|184126|1|2|5AX-2MT-105-120|Y
01|184126|1|3|SN:8245|Y
01|184130|1|1|This is a non-standard stock item considered special.|Y
01|184130|1|2|Once a PO has been issued this item cannot be|Y
01|184130|1|3|cancelled nor returned.|Y
01|184133|1|1|Replacement to CUR58657 for non repairable item|Y
01|184140|2|1|4ea avail at factoryif miss these ETA will be 3mnths|Y
01|184155|1|1|8-10wks mfg after receipt of signed dwg &|Y
01|184155|1|2|2wks air transportation after completion|Y
01|184160|1|1|PLEASE NOTE: HSK100A-C32-115 is a non stock tool. Once|Y
01|184160|1|2|an order is placed it cannot be cancelled or returned.|Y
01|184165|1|1|Req.INS:Need to check dual contact tolerance.|Y
01|184165|2|1|Req.INS:Need to check dual contact tolerance.|Y
01|184165|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|184166|1|1|MBT40-C32-120|Y
01|184166|1|2|MBT40 3 Lock 32mm Milling Chuck 8000rpm GL: 120mm|Y
01|184168|1|1|RGA#CUR-58625/|Y
01|184168|1|2|Repair of CAT40U-NX5-153 s/n:Pd0e|Y
01|184173|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|184173|4|1|** Closeout Promotion! All sales are FINAL!**|Y
01|184177|3|1|Please Note: This item is non standard stock. Once a|Y
01|184177|3|2|purchase order is placed it cannot be cancelled or|Y
01|184177|3|3|returned.|Y
01|184183|1|1|Missing 2 sizes:820-01010mm and 820-01515mm|Y
01|184192|3|1|Replaces part #VMK8-1/8J|Y
01|184200|1|1|With BIS-C-122-04/L installed|Y
01|184200|1|2|NET ea price no additional discount|Y
01|184200|1|3|Special item non cancelable and non returnable|Y
01|184200|2|1|NET ea charge|Y
01|184207|1|1|1st Batch(w/ScrewOnKey)|Y
01|184207|2|1|1st Batch(w/ScrewOnKey)|Y
01|184207|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|184207|4|1|Req.INS:Need to check dual contact tolerance.|Y
01|184207|5|1|Req.INS:Need to check dual contact tolerance.|Y
01|184215|2|1|6-pcs currently in stock. 74-pcs mid Sept balance|Y
01|184215|2|2|13~14 weeks.|Y
01|184215|45|1|Mazak|Y
01|184218|1|1|PLEASE NOTE:HSK100A-TC0562-5.20(C) is a non stock tool.|Y
01|184218|1|2|Once an order is placed it cannot be cancelled or|Y
01|184218|1|3|returned.|Y
01|184229|1|1|Rotary Table with special face plate setup for Allen|Y
01|184229|1|2|Bradley motor supplied by Honda. Same as S/N 7165.|Y
01|184229|1|3|RN-CN501SD-8+1-B 8+1 Rotary Joint Installed.|Y
01|184229|2|1|Match S/N 3695 w/special base plate w/o Rotary Joint.|Y
01|184229|3|1|TAT-401N-4+4+1PRJ match S/N 3653 with special base.|Y
01|184239|4|1|CAT50-SCA25.4-135U-IDU  1 Stub Arbor|Y
01|184239|4|2|This item is non standard stock. Once a purchase order|Y
01|184239|4|3|is placed it cannot be cancelled or returned.|Y
01|184244|1|1|NB4007-0016-3.50G >> NBT40 Dual Contact ER16 Collet|Y
01|184244|1|2|Chuck Bearing Smooth Nut|Y
01|184244|1|3|PLEASE NOTE: NB4007-0016-3.50G is a non stock tool.|Y
01|184244|1|4|Once an order is placed it cannot be cancelled or|Y
01|184244|1|5|returned.|Y
01|184251|3|1|Fee Waived by Chris Blaine as he will perfom install|Y
01|184251|3|2|and training for Nick Krinn's customer.|Y
01|184263|5|1|On quote file looking for either NBT or BT30SF1660GL|Y
01|184271|1|1|RGA#TAR-58644|Y
01|184271|1|2|CNCZ180LYA-BR-QT3|Y
01|184271|1|3|SN:20260T|Y
01|184274|1|1|RGA#TAR-58651|Y
01|184274|1|2|5AX-201FA-M|Y
01|184274|1|3|SN:4183|Y
01|184278|1|1|1st Batch *4/21:DWG approved/TR10-12wks(6/B~M)>6/15>6/|Y
01|184278|2|1|1st Batch/CBO 4/12:DWG Approved/TR10-12wks(6/B~M)>6/15|Y
01|184278|3|1|1st Batch/CBO 4/12:DWG Approved/TR10-12wks(6/B~M)>6/15|Y
01|184281|1|1|NCAT40-C1.1/4SL-150U-IDU|Y
01|184281|1|2|Special due to gage length|Y
01|184281|1|3|NCAT40 Dual Contact 1.1/4 Milling Chuck w/ 150mm gl|Y
01|184281|1|4|Nose=69mm diameter   ID Chip Hole|Y
01|184281|1|5|Pricing for 1-9pcs / Net price/each|Y
01|184283|2|1|$10 Ea/Net to etch customer part number onto collet|Y
01|184287|1|1|PLEASE NOTE:KM2-3/4 is a non stock tool. Once an order|Y
01|184287|1|2|is placed it cannot be cancelled or returned.|Y
01|184305|4|1|Installation Of both Left & Right Hand 4th Axis Tables|Y
01|184312|1|1|3pc $1478.22 Ea/Net|Y
01|184312|1|2|5pc $1127.69 Ea/Net|Y
01|184312|5|1|20pc $102.11 Ea/Net|Y
01|184312|5|2|30pc $94.31 Ea/Net|Y
01|184316|3|1|Please Note: Package pricing includes ten standard|Y
01|184316|3|2|inch size SF holders with less than 6.00 gage lengths|Y
01|184316|3|3|and a 200V shrink fit unit.|Y
01|184318|1|1|**Special Nose Diameter Per Drawing**|Y
01|184318|1|2|QTY BREAK PRICING:|Y
01|184318|1|3|12pc min. $267ea/net|Y
01|184318|1|4|24pc      $245ea/net|Y
01|184318|1|5|36pc      $235ea/net|Y
01|184318|1|6|48pc      $229ea/net|Y
01|184326|1|1|Rotary Table with special face plate setup for Allen|Y
01|184326|1|2|Bradley motor supplied by Honda. Same as S/N 7165.|Y
01|184326|1|3|RN-CN501SD-8+1-B 8+1 Rotary Joint Installed.|Y
01|184326|2|1|Match S/N 3695 w/special base plate w/o Rotary Joint.|Y
01|184326|3|1|TAT-401N-4+4+1PRJ match S/N 3653 with special base.|Y
01|184343|5|1|Pluggable Coolant Ports|Y
01|184344|6|1|50-35 Reduce / 50 Taper to 35 Taper Reducer|Y
01|184344|6|2|For BT35 Spindle Use CAT50 Spindle + Reducer|Y
01|184344|7|1|Part# PRE-GAUGE-B35|Y
01|184344|19|1|50-35 Reduce / 50 Taper to 35 Taper Reducer|Y
01|184344|19|2|For BT35 Spindle Use CAT50 Spindle + Reducer|Y
01|184344|20|1|Part# PRE-GAUGE-B35|Y
01|184366|1|1|5 Stk/5 Due 09/05 balance of 2-pcs pending.|Y
01|184372|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|184372|2|1|The 3 pc price is for the 3 already on the shelf.|Y
01|184372|2|2|7 pc - $255 net each|Y
01|184372|2|3|10 pc - $171 net each|Y
01|184387|2|1|Alternative to HSK63A-FMH25.4-70-90|Y
01|184387|15|1|Alternative for HSK63A-Z12-120|Y
01|184387|16|1|Alternative for HSK63A-Z24|Y
01|184387|16|2|e|N
01|184387|23|1|PMK8-4.8|Y
01|184392|8|1|SP Double Head Hydroflex type. MOQ: 10|Y
01|184392|15|1|Hydroflex Clamping Sleeve Clamping Dia: 25mm|Y
01|184456|1|1|NET ea price no additional discount will be given|Y
01|184456|1|2|Special item non cancelablenon returnable once ordered|Y
01|184457|2|1|SF-POT-#40 X 2 are included with price of Fi-6.|Y
01|184457|3|1|Please Note: Package pricing includes ten standard|Y
01|184457|3|2|inch size SF holders with less than 6.00 gage lengths|Y
01|184457|3|3|and a 200V shrink fit unit.|Y
01|184457|7|1|Holders are included as package price of FI-6.|Y
01|184457|8|1|Holders are included as package price of FI-6.|Y
01|184457|9|1|Holders are included as package price of FI-6.|Y
01|184461|1|1|Use for 5/32|Y
01|184474|1|1|P/N: AC5-SHMP10-41|Y
01|184482|3|1|MA-600HBII OKUMA machine|Y
01|184482|3|2|Swing Box|Y
01|184482|4|1|Cables Set Direct Mount|Y
01|184482|11|1|Direct mount cables|Y
01|184484|1|1|ZKG24-20-50L|Y
01|184484|1|2|ZKG24 TorqueControl Tap Collet Long|Y
01|184504|4|1|*Old style/part# - Brand New condition|Y
01|184504|4|2|1pc left in 6.30|Y
01|184547|1|1|Missing piece to complete set; ETA of 10/7 to LN.|Y
01|184552|1|1|P/N: TBD   OKLT-SK16Z-65-HS2-ICE|Y
01|184552|1|2|Okuma Live SK16 Z-Axis; 90Deg<Face> BMT IntExt Coolant|Y
01|184552|1|3|7MP; 1:2 GEAR|Y
01|184552|3|1|P/N: TBD  OKLT-SK16X-HS2-ICE|Y
01|184552|3|2|Okuma Live SK16 X-Axis; Strt<Side> BMT IntExt Coolant|Y
01|184552|3|3|7MP; 1:2 GEAR|Y
01|184555|1|1|Cheersun BOAT #08162201-B/No INS Req'd.|Y
01|184555|2|1|Cheersun BOAT #08162201-B/No INS Req'd.|Y
01|184555|3|1|Cheersun BOAT #08162201-B/No INS Req'd.|Y
01|184555|4|1|Cheersun BOAT #08162201-B/No INS Req'd.|Y
01|184555|5|1|Cheersun BOAT #08162201-B/No INS Req'd.|Y
01|184555|6|1|Cheersun BOAT #08162201-B/No INS Req'd.|Y
01|184555|7|1|Cheersun BOAT #08162201-B/No INS Req'd.|Y
01|184555|8|1|Cheersun BOAT #08162201-B/No INS Req'd.|Y
01|184555|8|2|**Need to re-box @ L/N**|Y
01|184555|9|1|Cheersun BOAT #08162201-B/No INS Req'd.|Y
01|184569|1|1|This item is considered special and its already|Y
01|184569|1|2|showing net price. Once purchased it can not be|Y
01|184569|1|3|canelled or returned|Y
01|184570|3|1|NC4006-0625-4.00CP|Y
01|184570|3|2|NCAT40 Dual Contact End Mill Holder 5/8 w/4.00 gage|Y
01|184570|3|3|length and coolant ports.|Y
01|184570|6|1|NC4006-0187-4.00CP|Y
01|184570|6|2|NCAT40 Dual Contact End Mill Holder 3/16 w/4.00 gage|Y
01|184570|6|3|length and coolant ports.|Y
01|184570|7|1|NC4006-0312-4.00CP|Y
01|184570|7|2|NCAT40 Dual Contact End Mill Holder 5/16 w/4.00 gage|Y
01|184570|7|3|length and coolant ports.|Y
01|184570|8|1|NC4007-0187-4.00CP|Y
01|184570|8|2|NCAT40 Dual Contact End Mill Holder 3/16 ID Chip Hole|Y
01|184570|8|3|Coolant Ports|Y
01|184584|1|1|P/N: TBD   VDI40 DIN1809; LIVE STRT ER32|Y
01|184584|1|2|Machine: Hurco TM10i|Y
01|184584|1|3|Mim#124222|Y
01|184584|5|1|P/N: TBD VDI40 DIN1809 LIVE; 90Deg ER32; L1-70mm|Y
01|184584|5|2|Mim#170933|Y
01|184598|1|1|RGA#LVR-58682/|Y
01|184598|1|2|Repair of MNZ20-ER25Z-ICE-12K s/n:88777 02|Y
01|184598|1|3|(Mimatic#174079)|Y
01|184598|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|184598|2|2|1 output spindle.|Y
01|184598|4|1|RGA#LVR-58682/|Y
01|184598|4|2|Repair of MNZ20-ER25Z-ICE-12K s/n:88777 04|Y
01|184598|4|3|(Mimatic#174079)|Y
01|184598|5|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|184598|5|2|1 output spindle|Y
01|184598|7|1|RGA#LVR-58682/|Y
01|184598|7|2|Repair of MNZ20-ER25Z-ICE-12K s/n:88777 05|Y
01|184598|7|3|(Mimatic#174079)|Y
01|184598|8|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|184598|8|2|1 output spindle.|Y
01|184611|25|1|** not available in SK25 series|Y
01|184618|2|1|Optional hydraulic unit for workholding and brake|Y
01|184618|2|2|max output pressure 1000psi|Y
01|184619|1|1|Pricing reflects a purchase order of 1 tool.|Y
01|184619|2|1|Pricing reflects a purchase order of 2 tools.|Y
01|184620|1|1|A foot pedal can be added to this machine and it also|Y
01|184620|1|2|comes in 380-480V.  I will need to update the quote for|Y
01|184620|1|3|either change because there is an additional cost.|Y
01|184637|1|1|1pc price:  $8549.00ea/ less 25% = $6411.75ea/net|Y
01|184637|1|2|2pc price:  $8549.00ea/ less 27% = $6240.77ea/net|Y
01|184689|1|1|part# TBD|Y
01|184689|1|2|Modify DIN Form B Coolant through the flange of|Y
01|184689|1|3|CAT40-C1.1/4SL-105U-IDU|Y
01|184689|1|4|NON-CANCELABLE/NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|184728|1|1|RGA#LVR-58715/|Y
01|184728|1|2|Repair of OKU-L370-X  s/n:AL772|Y
01|184728|1|3|(Alps#OK101-14000)|Y
01|184728|2|1|Bearings O-ring collet nut and spindle to be|Y
01|184728|2|2|replaced. If spindle can be reused the cost will be|Y
01|184728|2|3|$1250.00.|Y
01|184737|1|1|83pcs Stock balance mid-April|Y
01|184737|2|1|42pcs Stock balance e/o April|Y
01|184774|1|1|LEA1.1/2-1|Y
01|184774|1|2|Lathe Reducing Sleeve/Bushing Nikken Oil Jetter|Y
01|184774|1|3|1 1/2inch to 1inch  (Side Lock Type)|Y
01|184774|2|1|STH1.1/2-SK25-120|Y
01|184774|2|2|Straight Shank Extension OD 1.1/2inch SK25 Slim Chuck|Y
01|184774|6|1|LEA32-25|Y
01|184774|6|2|Lathe Reducing Sleeve/Bushing Nikken Oil Jetter|Y
01|184774|6|3|32mm to 25mm (Side Lock Type)|Y
01|184775|2|1|ST1-SK10-142|Y
01|184775|2|2|1 STR EXT SK10 Slim Chuck CNC Auto athe|Y
01|184775|8|1|ST1-SK13-142|Y
01|184775|8|2|1 STR EXT SK13 Slim Chuck CNC Auto athe|Y
01|184775|14|1|STH1.1/2-SK25-120|Y
01|184775|14|2|Straight Shank Extension OD1 1/2inch SK25 Slim Chuck|Y
01|184775|19|1|LM5-H|Y
01|184775|19|2|Morse Taper MT5 Live Center|Y
01|184801|1|1|Please Note: Above Edge Finder is non-standard stock.|Y
01|184801|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|184801|1|3|or returned.|Y
01|184808|3|1|Quoted at NET price.|Y
01|184808|4|1|Current delivery: Delivery: 3 stock at L-N5-pcs 2~3 WK|Y
01|184808|4|2|balance approx 6 weeks.|Y
01|184808|6|1|Current delivery: 2 stock 8-pcs 2~3 Weeks|Y
01|184808|6|2|balance approx 6 weeks.|Y
01|184827|1|1|E236+ PRESETTER WITH CAT50 SPINDLE INCLUDED|Y
01|184827|2|1|STAND/TABLE FOR PRESETTER|Y
01|184827|3|1|CAT50 MASTER GAUGE FOR PRESETTER|Y
01|184829|1|1|E346N PRESETTER WITH CAT50 SPINDLE INCLUDED|Y
01|184829|2|1|STAND/TABLE FOR PRESETTER|Y
01|184829|3|1|CAT50 MASTER GAUGE FOR PRESETTER|Y
01|184832|1|1|E346+ PRESETTER WITH CAT50 SPINDLE INCLUDED|Y
01|184832|2|1|STAND/TABLE FOR PRESETTER|Y
01|184832|3|1|CAT50 MASTER GAUGE FOR PRESETTER|Y
01|184843|1|1|NET PRICE; WILL NEED TO CHANGE MOTORS TO MITSUBISHI|Y
01|184843|1|2|PART NUMBER WILL BE 5AX-2MT-182-250-205MA-M|Y
01|184843|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|184852|6|1|External Coolant|Y
01|184852|7|1|External Coolant|Y
01|184859|5|1|Replaces C5003-0003-1.58|Y
01|184859|15|1|replaces C5016-0500-4.00|Y
01|184859|17|1|replaces C5016-0625-4.00|Y
01|184859|18|1|replaces C5056-0750-1.75|Y
01|184859|20|1|replaces C5016-0750-4.00|Y
01|184859|21|1|replaces C5056-1000-2.00|Y
01|184859|23|1|replaces C5056-1250-2.00|Y
01|184859|25|1|replaces C5056-1500-2.25|Y
01|184876|1|1|DNM4500|Y
01|184876|2|1|DNM4500|Y
01|184876|3|1|DNM4000|Y
01|184876|4|1|DNM4000|Y
01|184876|6|1|GEAR FOR SERVO MOTOR - EASIER TO PURCHASE MTR + GEAR|Y
01|184876|7|1|SENSORS FOR TAILSTOCK|Y
01|184876|8|1|SENSORS FOR TAILSTOCK|Y
01|184876|9|1|COMPLETE AIR SOLENOID/MANIFOLD/SENSOR ASSY FOR BRAKE|Y
01|184876|9|2|SYSTEM INSIDE MOTOR COVER|Y
01|184876|10|1|HOME SWITCH FOR ROTARY TABLE|Y
01|184876|11|1|POWER CABLE INSIDE TABLE|Y
01|184876|12|1|FEEDBACK CABLE INSIDE TABLE|Y
01|184878|5|1|This item is a special order it is non-cancelable &|Y
01|184878|5|2|non-returnable after receipt of PO|Y
01|184881|1|1|RGA#TAR-58719|Y
01|184881|1|2|CNC100-2W-120FA|Y
01|184881|1|3|SN:9007|Y
01|184893|1|1|1st Batch/922618 Butler/Dearborn 8/1:DWG Approved/Custo|Y
01|184902|1|1|RGA#TAR-58692|Y
01|184902|1|2|5AX-130YA|Y
01|184902|1|3|SN:5926|Y
01|184912|4|1|6 riser for table|Y
01|184919|1|1|H80F-SF0500-6.00B HSK80F Shrink Fit Holder with Makino|Y
01|184919|1|2|pins for Mag 1 & Mag 3.|Y
01|184928|1|1|NT65-ER16X-MSD >> Mimatic# 102771 for NAKAMURA SC300 ii|Y
01|184928|1|2|Nakamura Live; ER16 Straight Dual;Pitch Spindle 38.1mm;|Y
01|184928|1|3|L1=100mm 1:1.5 GEAR; MAX IN 8500RPM; MAX OUT 12700RPM|Y
01|184928|1|4|2) NT65-ER16X-MSD  $9224.85 Net >> Del End of Feb 2023|Y
01|184928|1|5|3) NT65-ER16X-MSD  $7700.00 Net >> Del End of Feb 2023|Y
01|184943|1|1|C4507-0025-6.00|Y
01|184943|1|2|Delv = 24wks after signed approval drawing is received|Y
01|184951|1|1|Net Price|Y
01|184951|1|2|Not include Scale not include Rotary Joint|Y
01|184951|2|1|Net Pice|Y
01|184951|2|2|same PLC tobe used as CNC205AA21-RU77|Y
01|184952|1|1|Net Price|Y
01|184952|1|2|Not inclde Scale not include Rotary Joint|Y
01|184952|2|1|Net Price|Y
01|184952|2|2|same PLC tobe used as CNC205AA21-RU77|Y
01|184991|2|1|Used for setting machine origin for Presetter.|Y
01|184991|3|1|This fee is being waived by Chris Blaine as he will|Y
01|184991|3|2|perfom the installation and needed training for this|Y
01|184991|3|3|customer.|Y
01|184991|8|1|***RECOMMENDED***|Y
01|184991|9|1|***RECOMMENDED***|Y
01|185005|2|1|2pc - $1612.00 net each|Y
01|185005|2|2|HSK63F Testbar 30-32mm dia x 200mm long|Y
01|185005|2|3|This is a complete special once ordered cannot be|Y
01|185005|2|4|cancelled or returned.|Y
01|185006|2|1|Complimentary wrench to syaw then from competitor|Y
01|185009|1|1|P/N: H80F-SF0750-8.00 w makino pin|Y
01|185009|1|2|HSK80F Shrink Fit Holder 3/4 diameter; w 8.00 g.l.|Y
01|185021|1|1|DIN Form B - manufactured at factory|Y
01|185021|1|2|*1pc left - all sales are final|Y
01|185021|1|3|**Discontinued after 1pc sold|Y
01|185021|5|1|part# C4006-6-2.50DIN-M|Y
01|185021|5|2|CAT40 6mm End Mill Holder - DIN Modified|Y
01|185021|5|3|IN HOUSE at LYN|Y
01|185021|5|4|*Specially modified. Cannot be cancelled or returned.|Y
01|185027|1|1|SPECIAL NET PRICING - TRUNK STOCK SHRINK FIT UNIT|Y
01|185030|1|1|BT50-FMH22-47-150|Y
01|185030|1|2|BT50 22mm Shell/Face Mill|Y
01|185030|1|3|SPECIAL ORDER NON-CANCELABLE/NON-RETURNABLE AFTER|Y
01|185030|1|4|RECEIPT OF PO|Y
01|185032|1|1|PLEASE NOTE: Discount reflects pricing under a|Y
01|185032|1|2|Tooling Certificate Redemption.|Y
01|185043|3|1|External Cables for connecting rotary table to machine|Y
01|185043|3|2|bulkhead connections. (2 per axis Quoted in pairs)|Y
01|185043|3|3|***This option is only needed if Heartland is doing the|Y
01|185043|3|4|installation.***|Y
01|185044|4|1|Inludes 4th Axis Interface Power and feedback cables|Y
01|185044|4|2|from Nikken Table to Machine Bulkhead Installation|Y
01|185044|4|3|& Travel|Y
01|185055|1|1|HSK100A-FMC32-75 HSK100A Shell/Face Mill Holder 32mm|Y
01|185055|1|2|With 75mm Gage Length.|Y
01|185059|1|1|cables come out the front|Y
01|185062|1|1|Special Close Out Price at NETno additional discount|Y
01|185067|1|1|Due to deliver to Lyndex Nikken week of 9/5/22|Y
01|185067|3|1|Due to Deliver to Lyndex Nikken week of 9/5/22|Y
01|185067|7|1|Installation and Training Included|Y
01|185072|1|1|Non-standard stock can not be cancelled or returned|Y
01|185072|1|2|once a PO has been received.|Y
01|185115|1|1|No returnable No cancellable after receiving PO|Y
01|185116|1|1|1:5 GEARED SPEEDER MAX 20000 RPMS|Y
01|185119|8|1|Delivery: 1 Stk/ 5-pc due 09/02 / 2-pc 3~4 weeks|Y
01|185122|1|1|1st Batch *Delayed due to COVID situation in Taiwan|Y
01|185122|2|1|1st Batch *Delayed due to COVID situation in Taiwan|Y
01|185123|1|1|1st Batch|Y
01|185123|2|1|1st Batch|Y
01|185123|3|1|1st Batch|Y
01|185123|4|1|1st Batch|Y
01|185123|5|1|1st Batch|Y
01|185131|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ROTARY|Y
01|185155|2|1|Installation includes: Dual axis drive short bar|Y
01|185155|2|2|communications cables fiber optic cables bulkhead|Y
01|185155|2|3|cables external cables parameter changes service|Y
01|185155|2|4|time and travel.|Y
01|185164|12|1|5/32 size fits into this collet.|Y
01|185211|7|1|**No Jet Slot Cap in this Size**|Y
01|185211|8|1|**No Jet Slot Cap in this Size**|Y
01|185211|24|1|**No Jet Slot Cap in this Size**|Y
01|185211|46|1|**No Jet Slot Cap in this Size**|Y
01|185211|47|1|**No Jet Slot Cap in this Size**|Y
01|185211|48|1|**No Jet Slot Cap in this Size**|Y
01|185226|4|1|HSK63F ER32 75mm GL|Y
01|185226|4|2|Part # HSK63F-ER32-75|Y
01|185226|7|1|HSK63F 3/4 Face Mill holder 4 GL|Y
01|185226|7|2|HSK63F-SM0750-4.00|Y
01|185226|9|1|Balance of 13 more pcs 12-13 Weeks|Y
01|185226|10|1|H63F-SF14-90|Y
01|185226|12|1|H63F-SF18-95|Y
01|185226|14|1|H63F-SF25-120|Y
01|185226|16|1|H63F-SF4-80|Y
01|185226|17|1|H63F-SF5-80|Y
01|185226|19|1|H63F-SF8-80|Y
01|185233|1|1|PLEASE NOTE: CAT40-MMC8C-150U-IDU is a non stock tool.|Y
01|185233|1|2|Once an order is placed it cannot be cancelled or|Y
01|185233|1|3|returned.|Y
01|185233|2|1|PLEASE NOTE: VMK8-5/32 is a non stock tool. Once an|Y
01|185233|2|2|order is placed it cannot be cancelled or returned.|Y
01|185233|2|3|**Quoted at NET price**|Y
01|185242|3|1|To thread draw screw|Y
01|185242|3|2|Need info at time of order|Y
01|185242|3|3|NET PRICE|Y
01|185248|2|1|Pricing is for installation of (2) RT's on same trip.|Y
01|185263|1|1|RGA#LVR-58735/|Y
01|185263|1|2|Repair of MNL12-ER32Z-MS s/n:A1253 (Alps#T32216)|Y
01|185263|2|1|Bearings o-rings collet nut and spindle to be|Y
01|185263|2|2|replaced. If the spindle can be reused the cost will|Y
01|185263|2|3|be $1805.20|Y
01|185263|4|1|RGA#LVR-58735/|Y
01|185263|4|2|Repair of MNL12-ER40Z-MS s/n:A0003 (Alps#T32248)|Y
01|185263|5|1|Gears bearings o-rings and collet nut to be replaced.|Y
01|185264|1|1|Discounts on the quote are based purchase & redemption|Y
01|185264|1|2|of Tooling Certificate pricing only.|Y
01|185269|1|1|2ea currently avail ETA 2weeks. More will be available|Y
01|185269|1|2|in 4-5 weeks|Y
01|185269|1|3|Special items not cancelablenor returnable once order|Y
01|185269|1|4|is placed. Priced at NET eano additional discount|Y
01|185294|1|1|PLEASE NOTE:ZKG12-3/8U is a non stock item. Once an|Y
01|185294|1|2|order is placed it cannot be cancelled or returned.|Y
01|185302|5|1|PLEASE NOTE:MI32-ER16I is a non stock tool. Once an|Y
01|185302|5|2|order is placed it cannot be cancelled or returned.|Y
01|185302|9|1|Please Note: 250-141 is non standard stock. Once a|Y
01|185302|9|2|purchase order is placed it cannot be cancelled or|Y
01|185302|9|3|returned.|Y
01|185302|10|1|Part # 250-M2.8|Y
01|185302|10|2|Axial Compensating ER25 Tap Collet|Y
01|185302|10|3|Please Note: 250-M2.8 is non standard stock. Once a|Y
01|185302|10|4|purchase order is placed it cannot be cancelled or|Y
01|185302|10|5|returned.|Y
01|185315|1|1|Stock in Jpn|Y
01|185315|1|2|No cancellable No returnable after receiving PO|Y
01|185339|1|1|Alpha8/3000iF motor|Y
01|185345|1|1|Special not returnableonce stock is depleted these are|Y
01|185345|1|2|discontinued|Y
01|185352|1|1|P/N: H63ARAM-MI50-187-65TP|Y
01|185352|1|2|HSK63A Taper Angle Head w/MI50 quick change|Y
01|185352|1|3|capabilities. No Coolant version; 6500 MAX RPM;|Y
01|185352|1|4|Ref Drwg# 00043147|Y
01|185352|2|1|P/N: H63ARAM-MI50-187IC-65TP|Y
01|185352|2|2|same item as above but with INTERNAL COOLANT feature|Y
01|185358|1|1|NSK-RAX-271E|Y
01|185358|2|1|NSK-RAX-71E|Y
01|185368|1|1|PLEASE NOTE:ZKG24-9/16U is a non stock item. Once an|Y
01|185368|1|2|order is placed it cannot be cancelled or returned.|Y
01|185392|1|1|P/N: TBD|Y
01|185392|1|2|From IMTS: BMT65 ER25 ADJUSTABLE INTC live Tool|Y
01|185392|1|3|REF: 193136|Y
01|185439|1|1|RGA#TAR-58756|Y
01|185439|1|2|5AX-201ZA SN#5451|Y
01|185450|2|1|Thickness to be 1.164 per print|Y
01|185466|1|1|C4001-0750-1.75CP with 4-hole DIN modification|Y
01|185480|1|1|ID Threads = 1.790-24|Y
01|185491|1|1|RGA#TAR-58753|Y
01|185491|1|2|CNC180LFA SN:16317NT|Y
01|185503|1|1|RGA#TAR-58749|Y
01|185503|1|2|5AX-201SA-BR2 SN:4221|Y
01|185521|6|1|Includes $2000 tooling certificate|Y
01|185530|1|1|RGA#LVR-58746/|Y
01|185530|1|2|Repair of BMT65-SK20Z-ICE s/n: 20905265 02|Y
01|185530|1|3|(Mimatic#192968)|Y
01|185530|2|1|Bearings seals and o-rings to be replaced.|Y
01|185530|4|1|RGA#LVR-58746/|Y
01|185530|4|2|Repair of BMT65-SK20Z-ICE s/n: 20905265 13|Y
01|185530|4|3|(Mimatic#192968)|Y
01|185530|5|1|Bearings seals and o-rings to be replaced.|Y
01|185540|1|1|part# TBD|Y
01|185540|1|2|BMT55 ER16 Straight Radial Offset Live Tool|Y
01|185540|1|3|Gear Ratio 1:3    Max 18000RPM|Y
01|185540|1|4|External Coolant Supply over Coolant Pipe|Y
01|185540|1|5|Output direction is reversal to input|Y
01|185540|1|6|L=105mm   offset 13mm|Y
01|185540|1|7|QTY BREAK NET PRICING:|Y
01|185540|1|8|3pc  $6879.00ea/net|Y
01|185540|1|9|5pc+ $5136.00ea/net|Y
01|185540|1|10|*concept drawing only at this time|Y
01|185543|1|1|P/N: H80F-SF0750-8.00 w makino pin|Y
01|185543|1|2|HSK80F Shrink Fit Holder 3/4 diameter; w 8.00 g.l.|Y
01|185548|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|185549|2|1|HEIDENHEIN GLASS SCALES (ACCURACY +/- 5 ARC SECONDS)|Y
01|185549|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|185550|1|1|1st Batch/6/27RY:DWG to TEAMS for APRV|Y
01|185550|2|1|1st Batch/(1)918521 6/8:DWG Approved/BT|Y
01|185550|3|1|1st Batch/(2)926775 9/9:DWG Approved/BT|Y
01|185550|4|1|1st Batch/(2)926775 9/9:DWG Approved/BT|Y
01|185550|5|1|1st Batch/921337 Orizon 7/26:DWG Approved/Customer|Y
01|185555|1|1|Replacement for existing 5AX-130FA-M that was damaged|Y
01|185555|1|2|New table to use existing servo motors to reduce cost|Y
01|185555|1|3|New table to be configured to match old table with|Y
01|185555|1|4|serial #5879 used on YCM VC0852 with serial # VC05172.|Y
01|185555|10|1|This includes travel and labor for putting new table on|Y
01|185555|10|2|machine hooking up to existing interface setting zero|Y
01|185555|10|3|and new parameters.  Will also implement new cables if|Y
01|185555|10|4|also purchased.|Y
01|185561|1|1|TABLE INCLUDES SERVO MOTOR. M AT END OF PART NUMBER|Y
01|185561|1|2|SIGNIFIES MOTOR INCLUDED.|Y
01|185561|2|1|AIR/HYD BOOSTER FOR ROTARY TABLE BRAKE|Y
01|185561|4|1|Includes: Junction box external cables parameter|Y
01|185561|4|2|changes service time and travel.|Y
01|185561|4|3|Machine must have ladder for the additional 1 axis|Y
01|185561|4|4|KITAMURA TO SUPPLY DRIVE UNIT|Y
01|185561|4|5|ALLPRICES ABOVE REFLECT 1 TABLE INSTALLED PER MACHINE|Y
01|185566|1|1|PLEASE NOTE:HSK63F-VC6-90 is a non stock tool. Once an|Y
01|185566|1|2|order is placed it cannot be cancelled or returned.|Y
01|185566|2|1|PLEASE NOTE:HSK40E-VC6-90 is a non stock tool. Once an|Y
01|185566|2|2|order is placed it cannot be cancelled or returned.|Y
01|185576|1|1|PLEASE NOTE:HSK63F-VC6-90 is a non stock tool. Once an|Y
01|185576|1|2|order is placed it cannot be cancelled or returned.|Y
01|185576|2|1|PLEASE NOTE:HSK40E-VC6-90 is a non stock tool. Once an|Y
01|185576|2|2|order is placed it cannot be cancelled or returned.|Y
01|185597|9|1|$1000 Tooling Credit valid thru 12/31/2022|Y
01|185600|1|1|BT40-MMC12C-180-AA BT40 12mm Mini-Mini Chuck Coolant|Y
01|185600|1|2|w/180mm Gauge Length|Y
01|185600|1|3|PLEASE NOTE:BT40-MMC12C-180-AA is a non stock tool.|Y
01|185600|1|4|Once an order is placed it cannot be cancelled|Y
01|185600|1|5|or returned.|Y
01|185600|1|6|**This item has been quoted at NET price**|Y
01|185600|6|1|PLEASE NOTE:NBT40-SK13C-200 is a non stock tool.|Y
01|185600|6|2|Once an order is placed it cannot be cancelled|Y
01|185600|6|3|or returned.|Y
01|185600|7|1|NBT40-SK13C-250 NBT40 Dual Contact SK13 Slim Chuck|Y
01|185600|7|2|Coolant w/250mm Gauge Length|Y
01|185600|7|3|PLEASE NOTE:NBT40-SK13C-250 is a non stock tool.|Y
01|185600|7|4|Once an order is placed it cannot be canclled|Y
01|185600|7|5|or returned.|Y
01|185600|11|1|PLEASE NOTE:NBT40-SK10C-200 is a non stock tool.|Y
01|185600|11|2|Once an order is placed it cannot be cancelled|Y
01|185600|11|3|or returned.|Y
01|185600|12|1|PLEASE NOTE:NBT40-SK10C-250 is a non stock tool.|Y
01|185600|12|2|Once an order is placed it cannot be cancelled|Y
01|185600|12|3|or returned.|Y
01|185601|3|1|$10 Ea/Net to etch customer's part number|Y
01|185618|1|1|1st Batch/Stock *DWG Saved in Teams File.|Y
01|185618|2|1|1st Batch/Stock *DWG Saved in Teams File.|Y
01|185618|3|1|1st Batch/Stock *DWG Saved in Teams File.|Y
01|185618|4|1|1st Batch/For stock *DWG Saved in Teams File.|Y
01|185620|1|1|Replacement for existing table CNC260 serial# 12719C|Y
01|185620|1|2|Table to be configured to match existing table (MA-M)|Y
01|185620|1|3|Customer responsible for removal of old table and the|Y
01|185620|1|4|installation of new replacement table.|Y
01|185620|2|1|To replace existing TAT-250 Serial # 5079.|Y
01|185620|2|2|customer responsible for hook up and plumbing of new|Y
01|185620|2|3|TAT support table to new CNC260 rotary table.|Y
01|185623|1|1|AGW VDI40-DIN1809  ER32|Y
01|185623|1|2|Mimatic Part # 102771 - ref drawing 17914|Y
01|185623|1|3|VDI40 DUPLOMATIC DRIVE DIN 1809; SW8mm;|Y
01|185623|1|4|ER32; 90 LIVE HEAD; INT/ EXT COOLANT/ ICE; L1=90mm;|Y
01|185623|1|5|1:1 GEAR; MAX 50Nm; MAX6000RPM;|Y
01|185623|1|6|REVERSAL OF DIRECTION ROTATION;|Y
01|185623|1|7|ADJ BLOCK SIMILART# 124564|Y
01|185623|1|8|This price is based on ordering 3 pcs. Lower qty would|Y
01|185623|1|9|change the price.|Y
01|185623|4|1|AGW-DU-C-40-ER32-I|Y
01|185623|4|2|VDI40 DUPLOMATIC DRIVE DIN 1809; SW8mm;|Y
01|185623|4|3|ER32; STRAIGHT LIVE HEAD; EXT COOLANT;|Y
01|185623|4|4|L1=95mm; 1:1 GEAR; MAX 80Nm; MAX 6500RPM;|Y
01|185623|4|5|REVERSAL OF DIRECTION ROTATION; REF DRWG# 0001270;|Y
01|185630|1|1|Replaces C4011-1250-2.00|Y
01|185637|2|1|Quoted at NET price.|Y
01|185637|4|1|Price for 2 Special angle heads = $8500.00 less 25%.|Y
01|185637|4|2|Part#: H63ARAM-ER32-187TS-65TP-SP|Y
01|185637|4|3|HSK63 AGH; ER32;A=65mm/d=18mm|Y
01|185637|4|4|INCLUDED EXTRA PIN ON SUPPORT PLATE 25mmX O16mm;|Y
01|185637|4|5|NO COOLANT;L1=80mm;1:1 GEAR; 6500RPM; MAX 70Nm;|Y
01|185637|4|6|REF DRWG# 00046211 will be e-mailed to Select when|Y
01|185637|4|7|purchase order is received.|Y
01|185645|8|1|Includes (2) consecutive 8 hour days of Installation|Y
01|185645|8|2|and Training.|Y
01|185648|3|1|replaces C4017-0032-5.00|Y
01|185675|1|1|ref s./n.15998NT|Y
01|185681|1|1|NBT40-HC6-3.55 NBT40 Hydraulic Chuck 6mm|Y
01|185681|1|2|Minimum order quanity of 3pcs.|Y
01|185681|2|1|NBT40-HC8-3.55 NBT40 Hydraulic Chuck 8mm|Y
01|185681|2|2|Minimum order quanity of 3pcs.|Y
01|185681|3|1|CAT40-HC6-3.15 CAT40 Hydraulic Chuck 6mm|Y
01|185681|3|2|Minimum order quanity of 3pcs.|Y
01|185681|4|1|CAT40-HC8-3.15 CAT40 Hydraulic Chuck 8mm|Y
01|185681|4|2|Minimum order quanity of 3pcs.|Y
01|185691|1|1|Mimatic cutter Part #199705|Y
01|185691|2|1|Mimatic shank Part #171857|Y
01|185691|3|1|Mimatic screw Part #107529|Y
01|185691|4|1|Mimatic screwdriver Part #111594|Y
01|185693|4|1|Scale Mounting Kit|Y
01|185693|5|1|Custom 2-Port Rotary Joint|Y
01|185693|6|1|Custom 5M Cable Set|Y
01|185704|1|1|One free master of your choice with each set.|Y
01|185705|2|1|LYN to make position block upon receipt of spindle|Y
01|185705|2|2|drawing|Y
01|185705|2|3|Net Price|Y
01|185706|25|1|AX150R028|Y
01|185708|11|1|PRESETTER INSTALLATION & TRAINNG ONLY|Y
01|185711|1|1|Discontinued part max discount 35% no tool cert|Y
01|185716|1|1|3ea stock 3ea on 3-4 days ARO|Y
01|185723|1|1|Includes A06B-2223-B000 Fanuc AC Servo Motor|Y
01|185735|1|1|This item replaces discontinued C4005-0562-4.47|Y
01|185740|1|1|One base holder included with this purchase of kit.|Y
01|185741|2|1|In stock option in a longer length|Y
01|185746|10|1|Includes travel and labor for certified tech to come|Y
01|185746|10|2|and unpackage set up and train operators per customer|Y
01|185746|10|3|needs.|Y
01|185746|11|1|Free with Presetter purchase because you visited us at|Y
01|185746|11|2|IMTS.  Good for list price tool holders through L-N.|Y
01|185751|1|1|PLEASE NOTE:HSK63F-VC6-90 is a non stock tool. Once an|Y
01|185751|1|2|order is placed it cannot be cancelled or returned.|Y
01|185751|2|1|PLEASE NOTE:HSK40E-VC6-90 is a non stock tool. Once an|Y
01|185751|2|2|order is placed it cannot be cancelled or returned.|Y
01|185752|1|1|**Capable of coolant thru the positioning pin**|Y
01|185752|1|2|This is not internal coolant through head.|Y
01|185752|4|1|LYN to make position block upon receipt of spindle|Y
01|185752|4|2|drawing|Y
01|185752|4|3|NET price|Y
01|185753|1|1|6 pcs = $413.00 net ea. 9 pcs = $305.00 net ea.|Y
01|185753|1|2|C5006-0750A-6.00|Y
01|185753|1|3|CAT50 3/4 Aerospace End Mill 6 GL|Y
01|185755|1|1|Part # to be ordered as C4006-16-3.00DIN-M|Y
01|185755|1|2|Part will be modified from C4006-16-3.00 to add|Y
01|185755|1|3|2ea DIN holes.|Y
01|185755|1|4|Price is NET ea.Special not cancelablenor returnable|Y
01|185758|14|1|Closest match we have to PIONEER CAT40-MC100-0591|Y
01|185759|1|1|Note: Item is non-standard stock once a PO has been|Y
01|185759|1|2|recieved it can not be cancelled or returned.|Y
01|185762|1|1|C/H 80mm|Y
01|185769|2|1|40 TAPER SPINDLE FOR 346V+|Y
01|185769|3|1|HSK63A SPINDLE FOR E346V+|Y
01|185785|1|1|Note: Item is non-standard stock once a PO has been|Y
01|185785|1|2|received it can not be cancelled or returned.|Y
01|185788|2|1|.179 x 1-5/8|Y
01|185788|2|2|RMS-4.547-85L|Y
01|185788|3|1|.179x 3-1/8|Y
01|185788|3|2|RMS-4.547-120L|Y
01|185788|4|1|.236 x 1-5/8|Y
01|185788|4|2|RMS5.994|Y
01|185788|5|1|.236 x 2-1/2|Y
01|185788|5|2|RMS-5.994-115L|Y
01|185788|6|1|.250 x 1-5/8|Y
01|185788|6|2|RMS-6.35|Y
01|185788|7|1|.250 x 3|Y
01|185788|7|2|RMS-6.35-130L|Y
01|185788|8|1|.304 x 2-3/4|Y
01|185788|8|2|RMS-7.722|Y
01|185788|9|1|.400 x 2-3/4|Y
01|185788|9|2|RMS-10.16|Y
01|185788|14|1|.236 x 1-5/8|Y
01|185788|14|2|RMS-5.994-OH|Y
01|185788|15|1|.236x1-5/8|Y
01|185788|15|2|RMS-5.994-115L-OH|Y
01|185788|16|1|.250x1.5/8|Y
01|185788|16|2|RMS-6.35-OH|Y
01|185788|17|1|.250x3|Y
01|185788|17|2|RMS-6.35-130L-OH|Y
01|185788|18|1|.304X2-3/4|Y
01|185788|18|2|RMS-7.722-OH|Y
01|185788|19|1|.4x2-3/4|Y
01|185788|19|2|RMS-10.16-OH|Y
01|185824|5|1|Please Note: 250-141 is non standard stock. Once a|Y
01|185824|5|2|purchase order is placed it cannot be cancelled or|Y
01|185824|5|3|returned.|Y
01|185824|7|1|Part # 250-M2.8|Y
01|185824|7|2|Please Note: 250-M2.8 is non standard stock. Once a|Y
01|185824|7|3|purchase order is placed it cannot be cancelled or|Y
01|185824|7|4|returned.|Y
01|185827|1|1|Cables included.|Y
01|185831|22|1|Semi-Custom|Y
01|185831|22|2|PLEASE NOTE:NCAT40-C1.1/4SL-150U-IDU is a non stock|Y
01|185831|22|3|tool. Once an order is placed it cannot be cancelled|Y
01|185831|22|4|or returned.|Y
01|185862|4|1|Upon receipt of spindle drawing|Y
01|185874|1|1|PLEASE NOTE:S32-UMT is a non stock tool. Once an order|Y
01|185874|1|2|is placed it cannot be cancelled or returned.|Y
01|185880|1|1|Repeat order for same production line|Y
01|185889|1|1|This item is discontinued only two left.|Y
01|185908|2|1|3pcs - 2wks & balance 16 weeks|Y
01|185913|5|1|Includes 4th axis interface to machine bulkhead|Y
01|185913|5|2|Includes Power and Feed Back Cables from Nikken Table|Y
01|185913|5|3|to the Machine Bulkhead - Includes Travel and Labor|Y
01|185914|5|1|Includes 4th axis Interface to machine bulkhead|Y
01|185914|5|2|Includes Power and Feed Back Cables from Nikken Table|Y
01|185914|5|3|to the Machine Bulkhead - Includes Travel and Labor|Y
01|185917|1|1|NET PRICE; WILL NEED TO CHANGE MOTORS TO Okuma|Y
01|185917|1|2|PART NUMBER WILL BE 5AX-2MT-182-250-205OSP3-M|Y
01|185917|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|185919|1|1|Note: Item is non-standard stock once a PO has been|Y
01|185919|1|2|received it can not be cancelled or returned.|Y
01|185924|1|1|Due to Lyndex Nikken ETA 2nd week of October 2022|Y
01|185924|1|2|This is a High Torque Bearing Nut ER. I do have a solid|Y
01|185924|1|3|Nut ER Priced close to Techniks - Solid Nut ER has 3|Y
01|185924|1|4|times LESS gripping force more run out due to collet|Y
01|185924|1|5|twist - less vibration dampening.|Y
01|185930|2|1|*Non-standard stock non-returnable non-cancellable|Y
01|185936|2|1|Includes Haas motor and brake.|Y
01|185952|1|1|Includes: Nikken Alpha control with external cables|Y
01|185952|1|2|power cable pendant M-code cable.|Y
01|185953|7|1|HSK63A-HC0375-120 HSK63A Hydraulic Chuck 3/8 w/120 GL|Y
01|185953|7|2|PLEASE NOTE:HSK63A-HC0375-120 is a non stock tool.|Y
01|185953|7|3|Once an order is placed it cannot be cancelled|Y
01|185953|7|4|or returned.|Y
01|185953|7|5|DELIVERY: 3pcs ETA 2-3wks; Bal 15-16wks|Y
01|185953|8|1|HSK63A-HC0500-120 HSK63A Hydraulic Chuck 1/2 w/120 GL|Y
01|185953|8|2|PLEASE NOTE:HSK63A-HC0500-120 is a non stock tool.|Y
01|185953|8|3|Once an order is placed it cannot be cancelled|Y
01|185953|8|4|or returned.|Y
01|185953|8|5|DELIVERY: 15-16wks after drawing has been approved|Y
01|185953|8|6|*Approval drawing is required prior to manufacturing|Y
01|185958|1|1|PLEASE NOTE:CAT50U-NX4-192 is a non stock item. Once|Y
01|185958|1|2|an order is placed it cannot be cancelled or returned.|Y
01|185958|5|1|*Quoted at NET price|Y
01|185963|1|1|RGA#TOR-58555/|Y
01|185963|1|2|Repair of BT40-MMC4-90-AA|Y
01|185965|1|1|P/N: H63ARAM-MI50-187IC-65TP|Y
01|185965|1|2|HSK63A Taper Angle Head w/MI50 quick change|Y
01|185965|1|3|capabilities. INTERNAL Coolant; 6500 MAX RPM|Y
01|185965|2|1|P/N: H63ARAM-MI50-187IC-65TP|Y
01|185965|2|2|same item as above but with INTERNAL COOLANT feature|Y
01|185970|33|1|1 Free Tube Per Holder|Y
01|185976|1|1|We currently have 66 instock at the factory delivery|Y
01|185976|1|2|would be 1 to 2 weeks|Y
01|185979|3|1|P/N: SF-POT-HSK125A|Y
01|185979|3|2|Shrink Fit: Pot/Chuck Holder|Y
01|185980|5|1|Custom Positioning Block for Mazak MU800V|Y
01|185996|1|1|P/N: C50RAM-ER25-215ST-110FP|Y
01|185996|1|2|CAT50 Taper AGH; ER25 OFFSET; SLIM TYPE; L=215mm;|Y
01|185996|1|3|NO COOLANT; 1:1 GEAR MAX 15Nm; 10K RPM MAX;|Y
01|185996|1|4|Ref Drw# 00044144 in CAT50   MIM#140066|Y
01|185998|1|1|Note:Item is non-standar stock once a PO has been|Y
01|185998|1|2|received it cannot be cancelled or returned.|Y
01|186002|14|1|Buy 5 or more Collets and receive a 5% Discount on the|Y
01|186002|14|2|Chuck & 15% Discount on the Collets.|Y
01|186013|1|1|BT30-63F-81FT-167|Y
01|186013|1|2|Non returnable Non Cancellable|Y
01|186025|6|1|Please Note: The extra 5% is included in the discount|Y
01|186025|6|2|quoted.|Y
01|186033|1|1|Delivery: 1-pc 1~2 Weeks / Bal 13 Weeks ARO|Y
01|186046|1|1|IT50-C25-105|Y
01|186046|2|1|IT50-C25-135|Y
01|186046|2|2|There is currently stock in Japan which will take|Y
01|186046|2|3|2-3 weeks ARO to get them here.  If no stock at time of|Y
01|186046|2|4|order the ETA would be a minimum 16-18 weeks ARO|Y
01|186046|3|1|IT50-C25-165|Y
01|186046|3|2|5 pcs in Japan if no stock at time of order then ETA|Y
01|186046|3|3|would be 16-18 weeks ARO|Y
01|186056|13|1|List price quote only.Items must be purchased through|Y
01|186056|13|2|a Lyndex Nikken distributor|Y
01|186057|2|1|CAT40-Q20-110U|Y
01|186058|1|1|Net Price|Y
01|186060|9|1|HSK63A-ER16-4.00|Y
01|186060|9|2|HSK63A ER16 Collet Chuck HighTorque Bearing Nut|Y
01|186060|9|3|ID Chip Hole|Y
01|186060|10|1|HSK63A-ER16-6.00|Y
01|186060|10|2|HSK63A ER16 Collet Chuck HighTorque Bearing Nut|Y
01|186060|10|3|ID Chip Hole|Y
01|186060|11|1|HSK63A-ER16-8.00|Y
01|186060|11|2|HSK63A ER16 Collet Chuck HighTorque Bearing Nut|Y
01|186060|11|3|ID Chip Hole|Y
01|186060|12|1|HSK63A-ER20-4.00|Y
01|186060|12|2|HSK63A ER20 Collet Chuck HighTorque Bearing Nut|Y
01|186060|12|3|ID Chip Hole|Y
01|186060|13|1|HSK63A-ER20-6.00|Y
01|186060|13|2|HSK63A ER20 Collet Chuck HighTorque Bearing Nut|Y
01|186060|13|3|ID Chip Hole|Y
01|186060|26|1|HSK63A-0250-8.00|Y
01|186060|26|2|HSK63A End Mill Holder 1/4 w/ ID Chip Hole|Y
01|186060|26|3|Please Note: Delivery is based upon receipt of purchase|Y
01|186060|26|4|order after final approval drawing is received. This|Y
01|186060|26|5|item is special once a purchase order is placed it|Y
01|186060|26|6|cannot be cancelled or returned.|Y
01|186060|29|1|HSK63A-0312-8.00|Y
01|186060|29|2|HSK63A End Mill Holder 5/16 w/ID Chip Hole|Y
01|186060|29|3|Please Note: Delivery is based upon receipt of purchase|Y
01|186060|29|4|after final approval drawing is received. This tool is|Y
01|186060|29|5|special once a purchase order is placed it cannot be|Y
01|186060|29|6|cancelled or returned.|Y
01|186060|34|1|HSK63A-0500-8.00|Y
01|186060|34|2|HSK63A End Mill Holder 1/2 w/ID Chip Hole|Y
01|186060|34|3|Please note: Delivery is based upon receipt of purchase|Y
01|186060|34|4|order after final approval drawing is received. This|Y
01|186060|34|5|tool is special once a purchase order is placed it|Y
01|186060|34|6|cannot be cancelled or returned.|Y
01|186060|37|1|HSK63A-0625-8.00|Y
01|186060|37|2|HSK63A End Mill Holder 5/8 w/ ID Chip Hole|Y
01|186060|37|3|Please note: Delivery is based upon receipt of purchase|Y
01|186060|37|4|order after final drawing has been received. This tool|Y
01|186060|37|5|is special once a purchase order is placed it|Y
01|186060|37|6|cannot be cancelled or returned.|Y
01|186060|43|1|Substitute for E16-EXT-750|Y
01|186066|1|1|On Quote file for 4th piece|Y
01|186069|2|1|In stock version does not have coolant ports|Y
01|186076|1|1|MNZ20-ER25-AD-ICE|Y
01|186076|1|2|MIM#196584|Y
01|186076|1|3|Adjustable Live/Angle|Y
01|186076|1|4|Drawing Approval needed|Y
01|186076|1|5|Drawing ETA 1-2 weeks ARO|Y
01|186076|1|6|ETA after drawing approval - 10-12 Weeks|Y
01|186076|1|7|mimatic quote # 22103617/drw#56576|N
01|186114|1|1|This item is considered special. Once a purchase order|Y
01|186114|1|2|is received they can not be cancelled or returned.|Y
01|186114|15|1|This item is considered special. Once a purchase order|Y
01|186114|15|2|is received it can not be cancelled or returned.|Y
01|186123|1|1|MZQT46-ER25X-AD-ICE|N
01|186132|1|1|Please Note: Discount is based upon a purchase order|Y
01|186132|1|2|of 3 to 4 Height Presetter. If quantities change please|Y
01|186132|1|3|contact me for a re-quote.|Y
01|186148|13|1|All items are considered non standar stock specials.|Y
01|186148|13|2|They are not cancelable nor returnable once ordered|Y
01|186166|65|1|Please Note: IMTS promo 10% extra has been added to the|Y
01|186166|65|2|discount.|Y
01|186175|7|1|This item is consdered special once ordered it cannot|Y
01|186175|7|2|be cancelled or returned.|Y
01|186176|3|1|PLEASE NOTE:SKG16-10HG is a non stock tool. Once an|Y
01|186176|3|2|order is placed it cannot be cancelled or returned.|Y
01|186196|1|1|1st Batch *Delayed due to COVID situation in Taiwan|Y
01|186196|2|1|A tariff surcharge of 8% will be added to every order|Y
01|186196|2|2|placed after September 1st 2025(until further notice).|Y
01|186196|2|3|This surcharge will be acknowledged upon acceptance|Y
01|186196|2|4|of every order.|Y
01|186197|1|1|No brake is being used on this application|Y
01|186197|2|1|Scale with adapter kit and cable|Y
01|186198|3|1|Please Note: I added the extra 5% to the discount|Y
01|186198|3|2|for the live tool promo.|Y
01|186201|2|1|4ea avail at factoryif miss these ETA will be 3mnths|Y
01|186202|1|1|This tool is brand new|Y
01|186202|2|1|This tool has been gently used and comes with a|Y
01|186202|2|2|6 month warranty. One time special pricing|Y
01|186202|2|3|Once ordered it cannot be returned|Y
01|186204|48|1|Get a $1000 Shrink Fit Holder Tooling Credit with the|Y
01|186204|48|2|purchase of a Start2 Shrink Fit Machine.|Y
01|186204|48|3|Tooling credit applies at time of purchase of Shrink|Y
01|186204|48|4|Fit Machine.|Y
01|186216|1|1|GDS610 15 Taper Shank Holder w/ PB|Y
01|186232|1|1|Special NET PRICE _ Part Number for a Doosan would be|Y
01|186232|1|2|5AX-2MT-182-250-205FA-M|Y
01|186232|2|1|4th&5th axis interfacecables from nikken table to|Y
01|186232|2|2|machine bulkhead. Includes travel and labor|Y
01|186241|3|1|THIS BORING BAR USES WBGT0601 INSERTS|Y
01|186245|1|1|RGA#LVR-58769/|Y
01|186245|1|2|Repair of T32106 s/n:A0005|Y
01|186245|2|1|Bearings o-rings collet nut gear and spindle to be|Y
01|186245|2|2|replaced.|Y
01|186245|4|1|RGA#LVR-58769/|Y
01|186245|4|2|Repair of T32106 s/n:A0010|Y
01|186245|5|1|Bearings o-rings collet nut gear and spindle to be|Y
01|186245|5|2|replaced.|Y
01|186253|1|1|1st Batch *Delayed due to COVID situation in Taiwan|Y
01|186253|2|1|1st Batch 10-12wks(6/B~M)>6/15>6/E>9/M mfg>>ESD 9/28 AI|Y
01|186253|3|1|1st Batch/898681 Wm F Hurst *11/19/21:DWG Aprv'd/Custom|Y
01|186268|1|1|PLEASE NOTE:BT40-C3/4-105 is a non stock item. Once|Y
01|186268|1|2|an order is placed it cannot be cancelled or returned.|Y
01|186268|3|1|PLEASE NOTE:BT40-C1.1/4-120 is a non stock item. Once|Y
01|186268|3|2|an order is placed it cannot be cancelled or returned.|Y
01|186276|1|1|NBT40 Angle Head-Stryker-Size 301 Workpiece 2K->9.5KRPM|Y
01|186276|1|2|w/Case|Y
01|186276|2|1|NBT40 Angle Head-Stryker-Size 301 Workpiece 2K->9.5KRPM|Y
01|186276|2|2|w/Case|Y
01|186276|3|1|NBT40 Angle Head-Stryker-Size 301 Workpiece 2K->9.5KRPM|Y
01|186276|3|2|w/Case|Y
01|186281|23|1|10% Discount added for IMTS Promo|Y
01|186289|1|1|This table will be Rust Proofed for EDM flood water|Y
01|186289|1|2|environment . The table must be isolated.|Y
01|186289|1|3|Table includes motors with brakes.|Y
01|186289|2|1|The machine must have ladder for two additional axis|Y
01|186289|2|2|The machine contol must be capable of two additional|Y
01|186289|2|3|axis. Ladder modification and software options are not|Y
01|186289|2|4|included and are MSC/Mitsubishi repsonsibility.|Y
01|186293|3|1|MNZ20-ER32Z in MS|Y
01|186293|3|2|11-12 months after drawing approved.|Y
01|186293|3|3|Item is custome/specialonce a PO has been received  it|Y
01|186293|3|4|can not be cancelled or returned.|Y
01|186300|5|1|INSTALL/TRAINING FOR A TOTAL OF 8 HOURS|Y
01|186310|3|1|For 11/64|Y
01|186310|5|1|For #1|Y
01|186310|6|1|For #16|Y
01|186310|7|1|For Letter L|Y
01|186310|8|1|For Letter S|Y
01|186310|9|1|For Letter F|Y
01|186311|2|1|Includes 4th and 5th Axis interface.|Y
01|186311|2|2|Includes power and feedback cables from Nikken Table to|Y
01|186311|2|3|Machine.  Installaton and travel fees included.|Y
01|186314|1|1|6ea avail at factory|Y
01|186314|2|1|6ea avail at factory|Y
01|186314|13|1|7ea avail at factory|Y
01|186314|19|1|All items above are considered specials and are not|Y
01|186314|19|2|cancelable nor returnable once ordered.|Y
01|186316|2|1|B4007-0016-3.50G|Y
01|186316|2|2|BT40 ER20 Collet Chuck Bearing Smooth Nut|Y
01|186325|3|1|Only Needed if ER25 Straight Shank Adapters are used.|Y
01|186333|6|1|#250 Expanding 5C collet system.|Y
01|186343|11|1|SWAP HIGH SPEED NUT FOR STANDARD (4 PCS IN STOCK)|Y
01|186365|1|1|RGA#TOR-58776/|Y
01|186365|1|2|Repair of PF-2|Y
01|186365|3|1|Calibration service included.|Y
01|186368|1|1|Req. INS/Install E32-NUT & B/U Screw|Y
01|186368|2|1|Req. INS/Install E40-NUT & ER40-SCREW(C)|Y
01|186368|3|1|Req. INS/Install E25-NUT & ER25-SCREW(C)|Y
01|186368|4|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|186384|1|1|Non cancellable Non returnable after receiving PO|Y
01|186384|2|1|Non cancellable Non returnable after receiving PO|Y
01|186384|4|1|Non cancellable Non returnable after receiving PO|Y
01|186384|6|1|NMTB30-C25-80|Y
01|186384|6|2|Non cancellable Non returnable after receiving PO|Y
01|186387|1|1|TAR-58807|Y
01|186387|1|2|CNC250BFA SN: 1144|Y
01|186392|1|1|Mimatic# 102771 OKUMA LIVE;; BMT60;|Y
01|186392|1|2|ER25 STRAIGHT Radial/Cross Offset Dual;|Y
01|186392|1|3|EXTERNAL COOLANT; L=80mm;1:1 GEAR MAX 20Nm/SPINDLE;|Y
01|186392|1|4|MAX 6500 RPM; Mimatic #102771|Y
01|186396|1|1|DELIVERY: 1pc ETA 2-3wks ARO;Balance ETA 8-9wks ARO|Y
01|186396|1|2|PLEASE NOTE:NT65-ER32X-ICE is a non stock item. Once an|Y
01|186396|1|3|order is placed it cannot be cancelled or returned.|Y
01|186396|1|4|*Quoted at NET price.|Y
01|186396|2|1|PLEASE NOTE:NT65-ER32Z-ICE is a non stock item. Once an|Y
01|186396|2|2|order is placed it cannot be cancelled or returned.|Y
01|186396|2|3|*Quoted at NET price.|Y
01|186396|5|1|PLEASE NOTE:NT65-SK20X-ICE is a non stock item. Once an|Y
01|186396|5|2|order is placed it cannot be cancelled or returned.|Y
01|186396|5|3|*Quoted at NET price.|Y
01|186396|6|1|*Quoted at NET price.|Y
01|186398|2|1|Please Note: This may not be the block they need. I am|Y
01|186398|2|2|adding to the quote in case they need one.|Y
01|186398|3|1|Quoted at NET price.|Y
01|186398|4|1|Current delivery: Delivery: 3 stock at L-N5-pcs 2~3 WK|Y
01|186398|4|2|balance approx 6 weeks.|Y
01|186398|7|1|Current delivery: 2 stock 8-pcs 2~3 Weeks|Y
01|186398|7|2|balance approx 6 weeks.|Y
01|186413|4|1|CAT50-SCA25.4-135 >>CAT50 Stub Arbor with 135mm gage|Y
01|186413|4|2|length. Please Note: This stub mill arbor is non|Y
01|186413|4|3|standard stock. Once a purchase order is placed it|Y
01|186413|4|4|cannot be cancelled or returned.|Y
01|186413|7|1|NC5002-1250-6.28|Y
01|186413|7|2|NCAT50 Stub Mill Arbor 1.1/4 Taper Plus|Y
01|186413|7|3|Minimum Order 5-Pcs|Y
01|186413|7|4|Please Note: This item is non standard stock. Once|Y
01|186413|7|5|a purchase order is placed it cannot be cancelled|Y
01|186413|7|6|or returned.|Y
01|186413|9|1|NC5002-1250-6.28|Y
01|186413|9|2|NCAT50 Dual Contact Stub Mill Arbor 1.1/4|Y
01|186413|9|3|PLEASE NOTE:NC5002-1250-6.28 is a non stock tool. Once|Y
01|186413|9|4|an order is placed it cannot be cancelled or returned.|Y
01|186415|1|1|One Unit in Stock now - 2nd unit delivery ETA 12 weeks|Y
01|186424|1|1|CUSTOM BASEPLATE FOR 5AX-350FA|Y
01|186424|1|2|ON TOYODA FV1680|Y
01|186424|1|3|PER CUSTOMER APPROVAL|Y
01|186431|1|1|*Drawing Approval is required prior to manufacturing.|Y
01|186431|1|2|PLEASE NOTE:NC5001-32-60CP is a non stock tool. Once|Y
01|186431|1|3|an order is placed it cannot be cancelled or returned.|Y
01|186435|2|1|2 Riser 1 pc $1625ea 3 pc $1500ea 5 pc $1380ea|Y
01|186435|2|2|2-3 Wks ARO for 1 piece and 3-4 wks for larger qtys|Y
01|186438|10|1|Alternative for C5007-0020-6.00|Y
01|186438|12|1|Alternative to C5007-0025-6.00|Y
01|186461|11|1|SWAP HIGH SPEED NUT FOR STANDARD (4 PCS IN STOCK)|Y
01|186465|3|1|MZQT5-CAPTO5X-ICE // Mimatic#: TBC|Y
01|186465|3|2|Mazak Live VDI50 CAPTO5 X-Axis IntExtCoolant|Y
01|186465|3|3|PLEASE NOTE:MZQT5-CAPTO5X-ICE is a non stock tool. Once|Y
01|186465|3|4|an order is placed it cannot be cancelled or returned.|Y
01|186465|4|1|MZQT5-CAPTO5X-OFF-ICE // Mimatic#: TBC|Y
01|186465|4|2|Mazak Live VDI50 CAPTO5 X-Axis STRT Vertical Offset|Y
01|186465|4|3|IntExt Coolant|Y
01|186465|4|4|PLEASE NOTE:MZQT5-CAPTO5X-OFF-ICE is a non stock tool.|Y
01|186465|4|5|Once an order is returned it cannot be cancelled|Y
01|186465|4|6|or returned.|Y
01|186493|1|1|RGA#CUR-58801/|Y
01|186493|1|2|Repair of C40RAM-MI50-180-65TP s/n:82203 02|Y
01|186493|1|3|(Mimatic#178151)|Y
01|186493|2|1|Bearings seals o-rings and damaged output spindle to|Y
01|186493|2|2|be replaced.|Y
01|186500|1|2|`|N
01|186500|2|1|Quoted at Net Price.|Y
01|186503|1|1|P/N: CAT50-SK10-165U-IDU to be sent under MOD-58846|Y
01|186503|1|2|for DIN Modification services.|Y
01|186504|4|1|Wrenches above are required.Disregard id cust has them|Y
01|186506|14|1|Note: Extra 5% is included in the quoted discount.|Y
01|186510|1|1|CNCH202LFA-M SN: 2001|Y
01|186510|1|2|TAR-58764|Y
01|186511|1|1|CNCH202LFA-M SN: 2001|Y
01|186511|1|2|TAR-58764|Y
01|186511|23|1|Strip Rust on Casting Sand Blast and Repaint|Y
01|186511|25|1|Re-Grind Spindle to get rust off|Y
01|186518|5|1|The 4 items above are included in the Start2 Unit|Y
01|186523|3|1|Pot and Coil Clip Kit are included|Y
01|186530|2|1|HSK63F-Q26-95 base holder for HSK63F taper|Y
01|186530|2|2|This item is special once ordered it can not be|Y
01|186530|2|3|cancelled or returned. Line item already showing net|Y
01|186530|2|4|price.|Y
01|186532|6|1|$1000 Tooling Certificate IMTS PROMO|Y
01|186554|2|1|Will need customer to provide spindle drawing of mach.|Y
01|186554|2|2|in order for LN to make custom positioning block.|Y
01|186554|2|3|Customer can machine positioning block themselves if|Y
01|186554|2|4|desired.|Y
01|186554|5|1|This is a 5pc set SK10 Collets can also be purchased|Y
01|186554|5|2|individually too.|Y
01|186556|1|1|This is for our Shrink Fit Machine IMTS Promo Deal|Y
01|186556|1|2|This includes the Start2 unit and accessory package|Y
01|186556|1|3|along with our promotional offering of $1000 List Price|Y
01|186556|1|4|Tooling Certificate.  Along with the IMTS Promo We are|Y
01|186556|1|5|also adding another $1000 list price tooling cert. for|Y
01|186556|1|6|the end user to help them with start up tooling cost.|Y
01|186556|1|7|This has been issued and approved by CB/FF.|N
01|186556|3|1|IMTS 2022 Promo - $1000 List Price Tooling Certificate|Y
01|186556|3|2|*Good for LIST PRICE tool holders and accessories only*|Y
01|186570|12|1|NK32-6|Y
01|186570|12|2|This item is already showing Net price|Y
01|186570|13|1|NK32-8|Y
01|186570|13|2|This item is already showing net price|Y
01|186574|1|1|Ships 2 weeks A.R.O. includes Power and Feed Back|Y
01|186574|1|2|Cables from Machine Bulkhead.|Y
01|186574|1|3|Lyndex Nikken will cover the cost for Bob Ray to|Y
01|186574|1|4|Travel to our Mundlien Head Quarters. We will work|Y
01|186574|1|5|directly with the unit shipping to Daniel Defense.|Y
01|186574|1|6|Will will provide Rotary Table Training and install|Y
01|186574|1|7|procedures.|Y
01|186574|1|8|We will be on-site to install this table with Daniel|Y
01|186574|1|9|Denfense on determined Machine|Y
01|186574|9|1|Hass Install/ Lyndex Nikken|Y
01|186586|2|1|In stock substitute to the above holder|Y
01|186586|3|1|KM3/4-3/16 size out of stock|Y
01|186588|3|1|Hydraulic pump and tank for work holding components.|Y
01|186588|3|2|Pancake cylinder for ID clamping and tailstock.  Both|Y
01|186588|3|3|to be actuated via either M-Code or Foot Pedal is also|Y
01|186588|3|4|an option.  If foot pedal is the chosen route the foot|Y
01|186588|3|5|pedal(S) will need added to this quote.|Y
01|186588|4|1|Drewco Workholding Package: Includes ID mandrel and|Y
01|186588|4|2|custom collet for ID clamping pancake cylinder|Y
01|186588|4|3|drawbar and any needed adapters and hardware.|Y
01|186588|5|1|Riten Live Bull Nose Center with MT4 connection to|Y
01|186588|5|2|PBA-170-MT4 Tailstock. Riten Part# 56633|Y
01|186593|1|1|Completed questionaire required for PO acceptance|Y
01|186595|1|1|Includes (2) SF-POT-#40 Tool Holder Pots|Y
01|186595|3|1|Get a $1000 Shrink Fit Holder Tooling Credit with the|Y
01|186595|3|2|purchase of a Start2 Shrink Fit Machine.|Y
01|186595|3|3|IMTS promotions are only valid through Dec 31 2022.|Y
01|186596|1|1|Includes (2)SF-POT-#40 Tool Holder Pots|Y
01|186596|2|1|Get a $1500 Shrink Fit Holder Tooling Credit with the|Y
01|186596|2|2|purchase of a Fi6 Shrink Fit Machine.|Y
01|186596|2|3|IMTS promotions are only valid through Dec 31 2022.|Y
01|186601|6|1|1/8  special .240 nose diameter 1.600 nose length|Y
01|186601|8|1|4mm  special 7mm nose diameter 1.600 nose length|Y
01|186602|1|1|DELIVERY: 17 Stk; 13 ETA of Dec; Balance 22-23wks ARO|Y
01|186602|7|1|DELIVERY: 11 Stk; Balance 22-23wks ARO|Y
01|186602|8|1|DELIVERY: 17 Stk; 50 ETA 2-3wks; Balance 22-23wks ARO|Y
01|186602|18|1|DELIVERY: 23 Stk; 13 ETA 2-3wks; Balance 22-23wks ARO|Y
01|186606|1|1|RGA#TAR-58773|Y
01|186611|1|1|1st Batch/For stock 4/21/20:DWG Approved/AR|Y
01|186618|5|1|JET SLOT STYLE|Y
01|186631|1|1|Final part# C5006-2000-5.37DIN-M|Y
01|186634|1|1|Installed with PS-123E|Y
01|186634|2|1|Installed on NC5 holder|Y
01|186638|2|1|CAT40-Q20-110U|Y
01|186641|4|1|All sales are final.|Y
01|186641|4|2|Brand New - Pre-balance and balanceable|Y
01|186641|4|3|*NET price|Y
01|186658|1|1|Includes: QCFC 80 DL Chuck A2-8 base and Blank Draw|Y
01|186658|1|2|Screw. This is modular DL design and the base can be|Y
01|186658|1|3|changed out as necessary.|Y
01|186658|1|4|***Customer to thread draw screw themselves***|Y
01|186658|1|5|***Lyndex-Nikken can provide this service but it would|Y
01|186658|1|6|need added to the quote as that has not been quoted.|Y
01|186679|2|1|Quoted at NET price once we receive a purchase order|Y
01|186679|2|2|it cannot be cancelled or returned.|Y
01|186687|1|1|Includes: QCFC 80 DL Chuck A2-8 base and Blank Draw|Y
01|186687|1|2|Screw. This is modular DL design and the base can be|Y
01|186687|1|3|changed out as necessary.|Y
01|186687|1|4|***Customer to thread draw screw themselves***|Y
01|186687|1|5|***Lyndex-Nikken can provide this service but it would|Y
01|186687|1|6|need added to the quote as that has not been quoted.|Y
01|186699|1|1|NCAT50-C3/4-200U|Y
01|186699|1|2|1-9 pcs|Y
01|186699|2|1|NCAT50-C3/4-200U|Y
01|186699|2|2|10-19 pcs|Y
01|186699|3|1|NCAT50-C3/4-200U|Y
01|186699|3|2|20-29 pcs|Y
01|186720|9|1|9ea avail at factory|Y
01|186738|4|1|PLEASE NOTE:CKFN32(1.1/4)-16C is a non stock tool. Once|Y
01|186738|4|2|an order is placed it cannot be cancelled or returned.|Y
01|186738|5|1|PLEASE NOTE:CCK1.1/4-10 is a non stock tool. Once an|Y
01|186738|5|2|order is placed it cannot be cancelled or returned.|Y
01|186746|1|1|Special item non cancelable nor returnable once ordered|Y
01|186748|1|1|BMT65 LIVE; 90 DEG HEAD; SAWBLADE HOLDER|Y
01|186748|1|2|1.7:1 GEAR; MAX 55Nm|Y
01|186748|1|3|MAX INPUT 4000RPM MAX OUTPUT 2350RPM|Y
01|186748|1|4|ELTIMON EQUIPPED - TOOL INTEGRATED MONITORING|Y
01|186748|1|5|Ref. CONCEPT drawing only: 00049562 but in BMT65|Y
01|186748|1|6|Haas ST20Y|Y
01|186748|1|7|*1pc $14200.00ea/net|Y
01|186748|1|8|*2pc $11000.00ea/net|Y
01|186748|1|9|*3pc $9700.00ea/net|Y
01|186748|8|1|PolySAW PS-G 125/25 Tinamatic-3 125mm Polysaw|Y
01|186748|8|2|O125 z=48 A2.0 d1=45.0 depth.-max= 40.0|Y
01|186749|1|1|DMG LIVE BMT60; POLYGON 25; 90DEG HEAD|Y
01|186749|1|2|ELTIMON Equipped - TOOL INTEGRATED MONITORING|Y
01|186749|1|3|L=92.5mm  1.7:1 GEAR; MAX 55Nm|Y
01|186749|1|4|MAX IN 4000 PRM; MAX OUT 2350 RPM|Y
01|186749|1|5|CONCEPT DRAWING ONLY# 00051403|Y
01|186749|1|6|for DMG NLX1500     - part# TBD|Y
01|186749|1|7|*1pc $14200.00ea/net|Y
01|186749|1|8|*2pc $10900.00ea/net|Y
01|186749|1|9|*3pc $9650.00ea/net|Y
01|186749|1|10|*5pc $8500.00ea/net|Y
01|186749|15|1|part# TBD/ Ref Mimatic# 164524|Y
01|186749|15|2|PDeepMILL -ECO milling-shim size 80/25diameter80|Y
01|186749|15|3|z=48 A1.0 d1=29 depth=25|Y
01|186749|15|4|Tinamatic-3Solid-carbide shim DeepMILL ECO size 8025-|Y
01|186749|15|5|Cutting diameter 50mm-|Y
01|186749|15|6|Number of teeth z = 48- diameter d1=29mm -|Y
01|186749|15|7|max. cutting depth Stt.= 25mm- cutting width A = 1.0 mm|Y
01|186749|15|8|according to MIMATIC drawing 00041689-M|Y
01|186749|15|9|Carbide grade FKN (micrograin)/ Tinamatic-3 coated|Y
01|186757|1|1|1st Batch *DWG saved in Teams File|Y
01|186764|7|1|INCLUDES ONE (8) HOUR DAY FOR INST/TRNG PER UNIT|Y
01|186769|3|1|Due to servo motor model and size Amps on Machine will|Y
01|186769|3|2|need changed out.  Also will need to supply new cables|Y
01|186769|3|3|from table to machine (included) and wire in new hyd.|Y
01|186769|3|4|pump.|Y
01|186770|1|1|These are non cancelable non returnable special items|Y
01|186773|1|1|THE SPECIAL PRICE IS FOR DISPLAY UNIT AT LN OFFICE|Y
01|186773|8|1|INCLUDES ONE (8) HOUR DAY FOR INST/TRNG PER UNIT|Y
01|186775|7|1|INCLUDES ONE (8) HOUR DAY FOR INST/TRNG PER UNIT|Y
01|186792|1|1|1st Batch/For stock 4/17/20 DWG Approved'20>'21>Jan/2|Y
01|186792|2|1|1st Batch/For stock 4/21/20:DWG Approved/AR'21>3/4>4/1|Y
01|186792|3|1|1st Batch/For stock 4/15/20:DWG Approved/AR'21>2/18>3/|Y
01|186798|3|1|C5006-0750-4.00 w/2-Hole DIN modification|Y
01|186798|3|2|SPECIAL - Non-cancelable non-returnable|Y
01|186811|1|1|BT45-SF0500-3.15 BT45 Shrink Fit Holder 1/2 with|Y
01|186811|1|2|3.15 gage length.|Y
01|186826|1|1|RGA#TAR-58794|Y
01|186826|1|2|NCT200EOSP4  SN:1503C|Y
01|186827|1|1|RGA#LVR-58828/|Y
01|186827|1|2|Repair of OKL3-ER32Z-OFMS s/n:A0106 (Alps#OK109-15001)|Y
01|186827|2|1|Bearings o-rings collet nuts spindle and spindle|Y
01|186827|2|2|cover to be replaced.|Y
01|186833|36|1|All holders must have ID chip hole|Y
01|186833|38|1|All items to be purchased on same PO to qualify for|Y
01|186833|38|2|Discount. Must ask for updated discount if anything|Y
01|186833|38|3|changes|Y
01|186842|3|1|**Confirm|Y
01|186842|12|1|**Confirm|Y
01|186852|9|1|Item is Non-standard stock once a PO is received|Y
01|186852|9|2|it can not be cancelled or returned|Y
01|186858|2|1|1 in stock|Y
01|186858|7|1|41 at Nikken|Y
01|186858|8|1|7 in warehouse 2|Y
01|186858|9|1|0 stock|Y
01|186870|15|1|SK20-4A   SK20 Slim Chuck Collet 4.0mm On Size|Y
01|186870|16|1|SK20-6A   SK20 Slim Chuck Collet 6.0mm On Size|Y
01|186870|17|1|SK20-8A   SK20 Slim Chuck Collet 8.0mm On Size|Y
01|186878|4|1|LN creates position block.Requires customer dimensions|Y
01|186878|4|2|NET ea price no additional discount|Y
01|186878|7|1|LN creates position block.Requires customer dimensions|Y
01|186878|7|2|NET ea price no additional discount|Y
01|186881|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|186905|13|1|This item is special once ordered it cannot be|Y
01|186905|13|2|cancelled or returned.|Y
01|186905|13|3|Minimum order qty is 5 pcs|Y
01|186908|1|1|Table with external cable from table to mid connection|Y
01|186921|1|1|C5-FMH22-47-45|Y
01|186921|2|1|C5-FMH22-47-60|Y
01|186921|3|1|C5-FMH22-47-90|Y
01|186926|1|1|RGA#TAR-58804|Y
01|186926|1|2|5AX-201FA-M  SN:4182|Y
01|186926|7|1|AX204R109|Y
01|186945|1|1|Please order as Part #D.T4-16ANGNon Stop Drill Tap Set|Y
01|186945|1|2|Net ea price no additional discount|Y
01|186945|1|3|Item is a non-cancelablenon-returnable special|Y
01|186945|2|1|Item is non-cancelable non returnable special|Y
01|186947|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ROTARY|Y
01|186947|4|1|AMPLIFIER CABLES FIBER OPTIC HARDWARE & PARAMETERS|Y
01|186947|5|1|LABOR & TRAVEL EXPENSES FOR L-N INSTALL TECHNICIAN|Y
01|186948|1|1|*** NET PRICE TO PTS *** You must add your GP to your|Y
01|186948|1|2|quote|Y
01|186961|1|1|RGA#TAR-58823|Y
01|186961|1|2|CNCZ321MA SN:15178|Y
01|186968|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ROTARY|Y
01|186968|4|1|AMPLIFIER CABLES FIBER OPTIC HARDWARE & PARAMETERS|Y
01|186968|5|1|LABOR & TRAVEL EXPENSES FOR L-N INSTALL TECHNICIAN|Y
01|186971|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ROTARY|Y
01|186971|4|1|AMPLIFIER CABLES FIBER OPTIC HARDWARE & PARAMETERS|Y
01|186971|5|1|LABOR & TRAVEL EXPENSES FOR L-N INSTALL TECHNICIAN|Y
01|186976|1|1|3/4 BASEPLATE FOR ASSEMBLY WITH MOUNTING HOLES &|Y
01|186976|1|2|KEYWAYS FOR CNC260L ROTARY TABLE|Y
01|186976|2|1|RISER TO MATCH CENTER HEIGHTS OF TAT-170 AND CNC260L|Y
01|186976|3|1|6x6x24 Four Sided Trunnion Table|Y
01|186977|1|1|3/4 BASEPLATE FOR ASSEMBLY WITH MOUNTING HOLES &|Y
01|186977|1|2|KEYWAYS FOR CNC260L ROTARY TABLE|Y
01|186977|2|1|RISER TO MATCH CENTER HEIGHTS OF TAT-170 AND CNC260L|Y
01|186977|3|1|6x6x24 Four Sided Trunnion Table|Y
01|186979|1|1|3/4 BASEPLATE FOR ASSEMBLY WITH MOUNTING HOLES &|Y
01|186979|1|2|KEYWAYS FOR CNC260L ROTARY TABLE|Y
01|186979|2|1|RISER TO MATCH CENTER HEIGHTS OF TAT-170 AND CNC260L|Y
01|186981|2|1|In stock alternative to above|Y
01|186981|10|1|spanner wrench for above|Y
01|186997|1|1|Completed questionaire required for PO acceptance|Y
01|186997|2|1|Quoted at NET price.|Y
01|187003|1|1|Completed questionaire required for PO acceptance|Y
01|187003|2|1|Quoted at NET price.|Y
01|187007|7|1|41 at Nikken|Y
01|187010|7|1|In stock option to above|Y
01|187014|6|1|PRICE AND DELIVERY ARE PENDING; DO NOT QUOTE AT $0|Y
01|187014|6|2|SPECIAL; NON-RETURNABLE & NON-CANCELLABLE|Y
01|187014|7|1|PRICE AND DELIVERY ARE PENDING; DO NOT QUOTE AT $0|Y
01|187014|7|2|SPECIAL; NON-RETURNABLE & NON-CANCELLABLE|Y
01|187014|8|1|PRICE AND DELIVERY ARE PENDING; DO NOT QUOTE $0|Y
01|187014|8|2|SPECIAL; NON-RETURNABLE & NON-CANCELLABLE|Y
01|187014|21|1|ALL AVAILABLE EXCEPT 8MM WHICH IS DUE MID JULY|Y
01|187014|22|1|ALL AVAILABLE EXCEPT 3/16 WHICH IS DUE MID JUNE|Y
01|187022|1|1|RGA#TAR-58803|Y
01|187022|1|2|NST250 SN:1219|Y
01|187022|14|1|NEW WIRE HARNESS|Y
01|187028|6|1|remanin pieces the ETA is the week of 11/28/2022|Y
01|187028|15|1|if no stk @ time of order ETA is the week of 11/28/22|Y
01|187035|1|1|1st Batch *Delayed due to COVID situation in Taiwan|Y
01|187035|2|1|1st Batch *Delayed due to COVID situation in Taiwan|Y
01|187035|3|1|1st Batch *Delayed due to COVID situation in Taiwan|Y
01|187057|2|1|SK20-6A|Y
01|187072|1|1|1st Batch|Y
01|187077|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|187079|2|1|This item is a non-standard stock item and is|Y
01|187079|2|2|considered special. Once an order is placed it cannot|Y
01|187079|2|3|be cancelled or returned. 1pc stock is at Nikken Japan|Y
01|187086|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|187087|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|187106|1|1|DESC:  HSK63A 0.75GL 10.584 End Mill Holder|Y
01|187106|1|2|Per customer provided drawing|Y
01|187106|6|1|DESC: HSK63A 0.75GL 11.254 End Mill Holder|Y
01|187106|6|2|Per customer's provided drawing|Y
01|187106|11|1|DESC. HSK63A Shell Mill Holder|Y
01|187106|11|2|Per customer's provided drawing|Y
01|187115|1|1|Elco part # FE100-060-120|Y
01|187115|2|1|Elco part # FE100-250-320|Y
01|187117|3|1|M code installation on Brother Machine|Y
01|187144|1|1|RGA#CUR-58808/|Y
01|187144|1|2|Repair of C8RAM-ER25-215ST-SP s/n:54769 01|Y
01|187144|1|3|(Mimatic#181541)|Y
01|187144|2|1|Bearings seals o-rings and 2 worn thread rings to be|Y
01|187144|2|2|replaced. Resurface 1 ER25 spindle (note: We will try|Y
01|187144|2|3|to expedite spindle if possible)|Y
01|187156|2|1|Alps NA11M Collet Nut|Y
01|187167|1|1|P/N HSK100A-SK16C-200 to be returned on RGA# MOD-58892|Y
01|187167|1|2|Modification - Install ID Chip Hole Install Balluff|Y
01|187167|1|3|Chip P/N: BIS-C-122-04/L Rebalance Holders|Y
01|187167|1|4|NEW P/N: HSK100A-SK16C-200-IDI when conplete|Y
01|187226|1|1|TAR-58807|Y
01|187226|1|2|CNC250BFA SN: 1144|Y
01|187232|3|1|Please Note: IMTS promo 5% has been added to discount.|Y
01|187237|26|1|Please Note: IMTS promo 10% has been applied to this|Y
01|187237|26|2|quote. If this should become an order it will need|Y
01|187237|26|3|to ship by truck. Thank you!!|Y
01|187252|1|1|Mimatic Part#:168325 // SA3080-ER25Z-100-LH-HS2|Y
01|187252|1|2|Sauter DIN5480 VDI30 Live ER25 Z-Axis 90Deg 13KrpmLeft|Y
01|187252|1|3|100mm Center Height|Y
01|187252|1|4|NET EA PRICE NO additional discount|Y
01|187262|4|1|Part #T11044|Y
01|187262|4|2|C4 Convertion Adapter|Y
01|187262|6|1|Part # T11056|Y
01|187262|6|2|C6 Convertion Adapter|Y
01|187278|1|1|Part# HSK63F/LPM-C32-110G\|Y
01|187278|1|2|1-9 pcs --> $926 net each|Y
01|187278|1|3|10-19 pcs --> $904 net each|Y
01|187278|3|1|Part # HSK63F/LPM-C1 1/4-110G|Y
01|187278|3|2|1-9 pcs --> $926 net each|Y
01|187278|3|3|10-19 pcs --> $904 net each|Y
01|187278|4|1|Part # HSK63F-HC32-125|Y
01|187278|4|2|6 pcs - $1182 net ea|Y
01|187278|4|3|9 pcs - $1135 net ea|Y
01|187278|4|4|12 pcs - $1091 net ea|Y
01|187278|5|1|Part # HSK63F-HC1250-125|Y
01|187278|5|2|6 pcs - $1182 net ea|Y
01|187278|5|3|9 pcs - $1135 net ea|Y
01|187278|5|4|12 pcs - $1091 net ea|Y
01|187285|1|1|Standard Nuts for C6-SK6-120|Y
01|187285|2|1|Standard Nuts for C6-SK10-120|Y
01|187287|1|1|LYN part# TBD|Y
01|187287|1|2|Ref. Mimatic# 101014|Y
01|187287|1|3|VDI40 ER32 90-Degree L1 = 75mm Live Tool|Y
01|187287|1|4|1pc $11066.00ea/net|Y
01|187287|1|5|2pc $7000.00ea/net|Y
01|187287|3|1|LYN part# TBD|Y
01|187287|3|2|Ref. Mimatic# 170933|Y
01|187287|3|3|VDI40 ER32 90-Degree Live Tool|Y
01|187287|3|4|1pc $6470.00ea/net|Y
01|187287|3|5|2pc $4836.00ea/net|Y
01|187287|5|1|LYN part# TBD|Y
01|187287|5|2|Ref. Mimatic# 124222|Y
01|187287|5|3|VDI40 ER32 Straight Live Tool|Y
01|187287|5|4|1pc $4521.00ea/net|Y
01|187287|5|5|2pc $3489.00ea/net|Y
01|187291|1|1|NBT30-SK25-90-J|Y
01|187291|1|2|Dual contact BT30 SK25 collet holder with Coolant nut|Y
01|187300|1|1|Note*: These holders do NOT come with Coolant Ports|Y
01|187305|1|1|Setup for Hydraulic Brake|Y
01|187310|64|1|Please note: IMTS Promo 10% discount has been added to|Y
01|187310|64|2|this quote.|Y
01|187316|1|1|1st Batch|Y
01|187316|2|1|1st Batch|Y
01|187316|3|1|1st Batch|Y
01|187316|4|1|1st Batch|Y
01|187316|5|1|1st Batch|Y
01|187316|6|1|1st Batch|Y
01|187316|7|1|1st Batch|Y
01|187316|8|1|1st Batch|Y
01|187316|9|1|1st Batch|Y
01|187316|10|1|1st Batch|Y
01|187316|11|1|1st Batch/921313 MSC/B&F 7/14:DWG Verbally appr'd/Custo|Y
01|187316|12|1|1st Batch/921313 MSC/B&F 7/14:DWG Verbally appr'd/Custo|Y
01|187316|13|1|1st Batch/921313 MSC/B&F 7/14:DWG Verbally appr'd/Custo|Y
01|187316|14|1|1st Batch/921313 MSC/B&F 7/14:DWG Verbally appr'd/Custo|Y
01|187316|15|1|1st Batch|Y
01|187316|16|1|1st Batch/924217 Colmar/Harvey 8/1:DWG Approved/Custome|Y
01|187316|17|1|1st Batch/For stock *8/1:DWG Approved/BT|Y
01|187327|1|1|ETA for additional pieces is Mid January 2023 IF the|Y
01|187327|1|2|order is placed very soon|Y
01|187329|1|1|DELIVERY: 17 Stk; 13 ETA of Dec; Balance 22-23wks ARO|Y
01|187329|7|1|DELIVERY: 9 Stk; Balance 22-23wks ARO|Y
01|187329|8|1|DELIVERY: 17 Stk; 50 ETA 2-3wks; Balance 22-23wks ARO|Y
01|187329|10|1|23 Stock / Bal 4 Weeks|Y
01|187329|14|1|21 Stock / Bal 4 Weeks|Y
01|187329|32|1|23 Stock / 13-pcs 4 Weeks >> 30-pcs 13~14 Weeks|Y
01|187331|3|1|Alternative for 5.5|Y
01|187339|16|1|DELIVERY: 17 Stk; 13 ETA of Dec; Balance 22-23wks ARO|Y
01|187339|21|1|DELIVERY: 9 Stk; Balance 22-23wks ARO|Y
01|187339|22|1|DELIVERY: 17 Stk; 50 ETA 2-3wks; Balance 22-23wks ARO|Y
01|187339|24|1|23 Stock / Bal 4 Weeks|Y
01|187339|28|1|21 Stock / Bal 4 Weeks|Y
01|187339|30|1|Quoting this instead of B4006-1000-2.00 as this is the|Y
01|187339|30|2|current version B4006-1000-2.00 is not available just|Y
01|187339|30|3|yet|Y
01|187343|3|1|Alternative for 5.5|Y
01|187344|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ROTARY|Y
01|187345|1|1|part# TBD|Y
01|187345|1|2|5C Collet with no through hole and no slots|Y
01|187345|1|3|BLANK Collet 55-60HRc|Y
01|187345|1|4|**Minimum Order Quantity: 5pcs|Y
01|187352|3|1|Alternate for 5.50GL|Y
01|187353|7|1|Comes with set screws to plug coolant ports|Y
01|187355|1|1|D20-6|Y
01|187356|1|1|Includes CT200R030 T-Slotted Faceplate.|Y
01|187356|2|1|Includes CT200R030 T-Slotted Faceplate.|Y
01|187356|3|1|Cable Set|Y
01|187358|8|1|$1000 Lyndex Nikken Tooling Certificate with Purchase|Y
01|187360|9|1|Slotted Nut for coolant to come out around the cutting|Y
01|187360|9|2|tool.|Y
01|187360|10|1|Coolant-Thru Nut for coolant to come out from tip of|Y
01|187360|10|2|the cutting tool.|Y
01|187363|1|1|for TS-2000YS TM-2000Y2|Y
01|187363|2|1|for TS-2000YS TM-2000Y2|Y
01|187363|3|1|for TS-3000/4000|Y
01|187363|4|1|for TS-3000/4000|Y
01|187363|5|1|ID#: 201767|Y
01|187363|5|2|ER32 X ICE LT BMT55 ER32 1:1 10000rpm for TM-4000Y2|Y
01|187363|5|3|Special Order. Net Price Each. MOQ: 5|Y
01|187363|6|1|ID#: 201769|Y
01|187363|6|2|ER32 Z ICE LT BMT55 ER32 1:1 6500rpm  for TM-4000Y2|Y
01|187363|6|3|Special Order. Net Price Each. MOQ: 5|Y
01|187365|3|1|Alternative for 5.5|Y
01|187367|5|1|ID#: 201768|Y
01|187367|5|2|SK20 X ICE LT BMT55 ER32 1:1 10000rpm for TM-4000Y2|Y
01|187367|5|3|Special Order. Net Price Each. MOQ: 5|Y
01|187367|6|1|ID#: 201770|Y
01|187367|6|2|SK20 Z ICE LT BMT55 ER32 1:1 6500rpm for TM-4000Y2|Y
01|187367|6|3|Special Order. Net Price Each. MOQ: 5|Y
01|187370|1|1|Standard Nuts for C6-SK6-120|Y
01|187370|2|1|Standard Nuts for C6-SK10-120|Y
01|187374|1|1|B4006-1250-3.56DIN-M|Y
01|187376|3|1|Alternative for 5.5|Y
01|187385|6|1|Laredo tx|Y
01|187389|1|1|Includes: Shrinkfit Machine Cooling Station Induction|Y
01|187389|1|2|Rings Cooling Brackets Storage Shelves and (2)CAT40|Y
01|187389|1|3|Chuck Holders.|Y
01|187392|9|1|Please Note: IMTS promotion 10% has been added to this|Y
01|187392|9|2|quote.|Y
01|187394|2|1|INCLUDES.: Wrenches|Y
01|187396|2|1|Extra discount extended for replacement spindle|Y
01|187398|1|1|RGA#TAR-58825|Y
01|187411|2|1|Direct Replacement for C4017-0016-6.00|Y
01|187411|6|1|Direct Replacement for C4017-0025-4.00|Y
01|187413|3|1|Alternative for 5.5|Y
01|187420|6|1|This is a 1 time special price for these items and|Y
01|187420|6|2|they are not returnable.|Y
01|187436|1|1|Replaces C5016-0750-4.00|Y
01|187438|5|1|Option 1 - Pull-back style 5C chuck|Y
01|187438|6|1|Option 2 - dead-length style 5C chuck|Y
01|187438|9|1|Price is for one installation|Y
01|187438|9|2|4th & 5Th axis hardware required|Y
01|187438|9|3|Third Party software required if control is second gen|Y
01|187447|2|1|31/64 is closest to 12mm.Cust needs to check if works|Y
01|187447|3|1|Emegency collet has 1/16 pilot which customer can|Y
01|187447|3|2|bore to the accomodate a 12mm size|Y
01|187456|2|1|A2-11 Adapter Plate (Part# TBD)|Y
01|187474|6|1|We have 5 in stock and are expecting the balance 11/11|Y
01|187474|6|2|We also carry a 6 and have 7 in stock balance on 11/11|Y
01|187474|11|1|0 stock due on 11/4|Y
01|187474|12|1|0 stock due 11/11|Y
01|187474|12|2|We also carry a 6 inch and have stock|Y
01|187474|14|1|0 stock due 11/11|Y
01|187474|14|2|We also carry a 3.13 inch and have stock|Y
01|187483|4|1|Installation includes: Drive unit short bar fiber|Y
01|187483|4|2|optic cable communications cable bulkhead cables|Y
01|187483|4|3|external cables parameter changes service time and|Y
01|187483|4|4|travel.|Y
01|187484|1|1|P/N: BMT65-ER25-AD-ICE|Y
01|187484|1|2|BMT65 ER25 Adjustable Internal Coolant External|Y
01|187484|1|3|Coolant and can run DRY 24/7|Y
01|187486|14|1|Only comes with smooth nut needs special wrench lines|Y
01|187486|14|2|13 & 14 are the handle and attachment needed|Y
01|187489|1|1|LYN part# TBD|Y
01|187489|1|2|Ref. Mimatic# 101014|Y
01|187489|1|3|VDI40 ER32 90-Degree L1 = 75mm Live Tool|Y
01|187489|1|4|1pc $11066.00ea/net|Y
01|187489|1|5|2pc $7000.00ea/net|Y
01|187489|3|1|LYN part# TBD|Y
01|187489|3|2|Ref. Mimatic# 170933|Y
01|187489|3|3|VDI40 ER32 90-Degree Live Tool|Y
01|187489|3|4|1pc $6470.00ea/net|Y
01|187489|3|5|2pc $4836.00ea/net|Y
01|187489|5|1|LYN part# TBD|Y
01|187489|5|2|Ref. Mimatic# 124222|Y
01|187489|5|3|VDI40 ER32 Straight Live Tool|Y
01|187489|5|4|1pc $4521.00ea/net|Y
01|187489|5|5|2pc $3489.00ea/net|Y
01|187530|2|1|**NET CHARGE to SST|Y
01|187576|2|1|Installation includes: Dual axis drive fiber optic cab|Y
01|187576|2|2|communications cables bulkhead cables external cables|Y
01|187576|2|3|parameter changes service time and travel.|Y
01|187576|2|4|L/N will install both tables and run SRAM back up for|Y
01|187576|2|5|both tables.|Y
01|187578|2|1|3 gage length|Y
01|187578|2|2|Pre-balanced/balanceable|Y
01|187578|2|3|Special Price- All sales are final|Y
01|187585|1|1|MZQT47-ER32Z-SUB-HS2|Y
01|187585|1|2|90 DEG ER32 External coolant|Y
01|187585|1|3|Quoted at NET pricing|Y
01|187599|3|1|Ref. Mimatic# 169209 - LYN part# TBD|Y
01|187599|3|2|Reaming Holder Type RPS400 J5xD L140 L1=68|Y
01|187599|3|3|Shaft Diameter 16mm DIN 1835 HA (plain-shaft)|Y
01|187599|5|1|Ref. Mimatic Part# 176205 Concept Only - LYN part# TBD|Y
01|187599|5|2|Reamer-head RPK42 Flutes left-hand spiraled|Y
01|187599|5|3|Diameter of the reamer 0.5350 (13.589mm) +/-.001|Y
01|187599|5|4|Carbide FKN Tinamatic coated - gate geometry (LBG)|Y
01|187599|7|1|Ref. Mimatic Part# 176205 Concept Only - LYN part# TBD|Y
01|187599|7|2|Reamer-head RPK42 Flutes left-hand spiraled|Y
01|187599|7|3|Diameter of the reamer 0.5520 (14.021mm) +/-.001|Y
01|187599|7|4|Carbide FKN Tinamatic coated - gate geometry (LBG)|Y
01|187599|9|1|Ref. Mimatic Part# 176205 Concept Only - LYN part# TBD|Y
01|187599|9|2|Reamer-head RPK42 Flutes left-hand spiraled|Y
01|187599|9|3|Diameter of the reamer 0.5910 (15.012mm) +/-.001|Y
01|187599|9|4|Carbide FKN Tinamatic coated - gate geometry (LBG)|Y
01|187599|13|1|Ref. Mimatic Part# 171784 - LYN part# TBD|Y
01|187599|13|2|Milling body PolyMILL P12 solid carbide-shaft 12mm Dia.|Y
01|187599|13|3|with internal coolant. 100mm OAL.|Y
01|187599|15|1|Ref. Mimatic Part# 176205 Concept Only - LYN part# TBD|Y
01|187599|15|2|Reamer-head RPK42 Flutes left-hand spiraled|Y
01|187599|15|3|Diameter of the reamer 0.3790 (9.627mm) +/-.001|Y
01|187599|15|4|Carbide FKN Tinamatic coated - gate geometry (LBG)|Y
01|187599|17|1|Ref. Mimatic Part# 176205 Concept Only - LYN part# TBD|Y
01|187599|17|2|Reamer-head RPK42 Flutes left-hand spiraled|Y
01|187599|17|3|Diameter of the reamer 0.4240 (10.769mm)+/-.001|Y
01|187599|17|4|Carbide FKN Tinamatic coated - gate geometry (LBG)|Y
01|187599|19|1|Ref. Mimatic Part# 176205 Concept Only - LYN part# TBD|Y
01|187599|19|2|Reamer-head RPK42 Flutes left-hand spiraled|Y
01|187599|19|3|Diameter of the reamer 0.4430 (11.252mm)+/-.001|Y
01|187599|19|4|Carbide FKN Tinamatic coated - gate geometry (LBG)|Y
01|187613|1|1|**Special one time only pricing**|Y
01|187620|3|1|Tightening Torque: 11Ft-Lbs|Y
01|187620|4|1|Tightening Torque: 44-59Ft-Lbs // 60-80Nm|Y
01|187621|2|1|#50 Test Bar / No Flange 1.3/4(44.45mm)X200mm Inch Thrd|Y
01|187621|2|2|in Wooden Case|Y
01|187621|2|3|Please Note: Delivery is based upon receipt of purchase|Y
01|187621|2|4|order after final signed approval drawing is received.|Y
01|187621|2|5|This item is Special once a purchase order is placed|Y
01|187621|2|6|it cannot be cancelled or returned.|Y
01|187632|7|1|Installation and Training fee waived by Chris Blaine as|Y
01|187632|7|2|he will personally install and train customers as a|Y
01|187632|7|3|courtesy and Thank You.|Y
01|187636|7|1|Installation and Training fee waived by Chris Blaine as|Y
01|187636|7|2|he will personally install and train customers as a|Y
01|187636|7|3|courtesy and Thank You.|Y
01|187640|4|1|Special item pending price and delivery|Y
01|187642|3|1|Optional: Stand|Y
01|187648|1|1|Stock Table with Aluminum Baseplate|Y
01|187651|3|1|Installation includes: Dual axis drive bulkhead cables|Y
01|187651|3|2|external cables parameter changes service time and|Y
01|187651|3|3|travel.|Y
01|187653|1|1|1st Batch/5/9/22:DWG Approved/TR18wks(9/M)>9/30>10/30|Y
01|187653|2|1|1st Batch *Delayed due to COVID situation in Taiwan10-|Y
01|187653|3|1|1st Batch/for stock 7/18/22 approved by Tim11/30mfg as|Y
01|187659|4|1|Please Note: K1.1/4-MMC8C-160 is non standard stock.|Y
01|187659|4|2|Once a purchase order is placed it cannot be cancelled|Y
01|187659|4|3|or returned.|Y
01|187659|11|1|Please Note: This is the same as VMK8-1/8J but has|Y
01|187659|11|2|3 jet slots.|Y
01|187663|1|1|Includes 10der Unit with Shelves - Pallets not|Y
01|187663|1|2|Included|Y
01|187663|2|1|IncludesInterfaceAutodoorInstallation and training|Y
01|187674|1|1|Special one time pricing|Y
01|187680|3|1|5AX-800WAR21-1875 - 800mm Faceplate with programmable|Y
01|187680|3|2|A21 Control Boxes for Tilt and Rotary axis.|Y
01|187680|4|1|5AX-1200WAR21-4444 - 1200mm Faceplate with programmable|Y
01|187680|4|2|A21 Control Boxes for Tilt and Rotary axis.|Y
01|187680|6|1|Integration of two Nikken Alpha21 controllers for the|Y
01|187680|6|2|rotary and tilt axis of the rotary table. This provides|Y
01|187680|6|3|incremental indexing control to the Rotary Table.|Y
01|187680|6|4|Cable management system will hang from an extension arm|Y
01|187680|6|5|from the top of spindle column. Complete installation|Y
01|187680|6|6|parts time and travel will take 4-6 days.|Y
01|187680|18|1|Integration of two Beta I/O link PMC axes for rotary &|Y
01|187680|18|2|tilt axis. Ths provides incremental indexing control.|Y
01|187680|18|3|Servo amplifiers and cables for the 6th and 7th Beta|Y
01|187680|18|4|are provided. MPG jog and MDI functions will be|Y
01|187680|18|5|integrated. B codes are used in the Fanuc part program|Y
01|187680|18|6|to command the axis position. The B axis posn. is not|Y
01|187680|18|7|displayed on the regular Fanuc position screen. The|Y
01|187680|18|8|B axis position can be viewed through the Fanuc CNC|Y
01|187680|18|9|Manager Screen. Cable management system will hang from|Y
01|187680|18|10|an extension arm from the top of spindle column.|Y
01|187683|1|1|CNCH202LFA-M SN: 2001|Y
01|187683|1|2|TAR-58764|Y
01|187683|23|1|Strip Rust on Casting Sand Blast and Repaint|Y
01|187683|25|1|Re-Grind Spindle to get rust off|Y
01|187689|1|1|1st Batch. *DWG saved in Teams File.|Y
01|187689|2|1|1st Batch. *DWG saved in Teams File.|Y
01|187691|4|1|Please Note: K1.1/4-MMC8C-160 is non standard stock.|Y
01|187691|4|2|Once a purchase order is placed it cannot be cancelled|Y
01|187691|4|3|or returned.|Y
01|187691|11|1|Please Note: This is the same as VMK8-1/8J but has|Y
01|187691|11|2|3 jet slots.|Y
01|187694|3|1|Order as Part #HSK100A-ER32S-100BN which is the solid|Y
01|187694|3|2|nut holder converted to a bearing nut holder.|Y
01|187694|3|3|Refer to drawings for dimensions|Y
01|187699|1|1|Includes Power and Feedback cables from Nikken Table|Y
01|187699|1|2|to machine bulkhead|Y
01|187701|1|1|Standard End Mill Holder - cannot be DIN modified|Y
01|187701|4|1|DIN Form B Modified with 2-holes|Y
01|187701|4|2|*Net price to MSC|Y
01|187701|4|3|*Delivery is 1 week from receipt of PO|Y
01|187708|3|1|Installation includes: Drive unit short bar fiber|Y
01|187708|3|2|optic cable communications cable bulkhead cables|Y
01|187708|3|3|external cables parameter changes  service time|Y
01|187708|3|4|and travel.|Y
01|187714|15|1|Bearing Nut|Y
01|187714|16|1|Bearing Nut|Y
01|187716|4|1|MNZ20-CAPTO4Z-ICE-12K / Mimatic #199419|Y
01|187716|4|2|Mori Live C4 Z-Axis 90Deg<Axial> Int/ExtCoolant;|Y
01|187716|4|3|12K RPM|Y
01|187716|4|4|Please Note: This tool is non standard stock. Once a|Y
01|187716|4|5|purchase order is placed it cannot be cancelled or|Y
01|187716|4|6|returned.|Y
01|187721|1|1|1st Batch|Y
01|187721|2|1|1st Batch|Y
01|187721|3|1|1st Batch|Y
01|187721|4|1|1st Batch|Y
01|187721|5|1|1st Batch|Y
01|187721|6|1|1st Batch|Y
01|187721|7|1|1st Batch|Y
01|187721|8|1|1st Batch|Y
01|187721|9|1|1st Batch|Y
01|187721|10|1|1st Batch|Y
01|187721|11|1|1st Batch|Y
01|187721|12|1|1st Batch|Y
01|187721|13|1|1st Batch|Y
01|187721|14|1|1st Batch|Y
01|187721|15|1|1st Batch|Y
01|187721|16|1|1st Batch|Y
01|187721|17|1|1st Batch|Y
01|187721|18|1|1st Batch|Y
01|187721|19|1|1st Batch|Y
01|187721|20|1|1st Batch|Y
01|187721|21|1|1st Batch|Y
01|187721|22|1|1st Batch|Y
01|187721|23|1|1st Batch|Y
01|187721|24|1|1st Batch|Y
01|187721|25|1|1st Batch|Y
01|187721|26|1|1st Batch|Y
01|187721|27|1|1st Batch|Y
01|187721|28|1|Req. INS/Install E32-NUT & ER32-SCREW(C)|Y
01|187730|1|1|RGA#CUR-58778/|Y
01|187730|1|2|Repair of CAT50U-NX5-151 s/n:KJ031|Y
01|187743|1|1|Please order as Part #D.T4-16ANGNon Stop Drill Tap Set|Y
01|187743|1|2|Net ea price no additional discount|Y
01|187743|1|3|Item is a non-cancelablenon-returnable special|Y
01|187743|2|1|Item is non-cancelable non returnable special|Y
01|187765|2|1|1pc Stock - 8pcs 2 wks - 6pcs pending|Y
01|187773|1|1|One time special price.|Y
01|187780|1|1|RGA#TAR-58866|Y
01|187780|1|2|CNCZ503-HFAB SN:3085|Y
01|187784|1|1|1st Batch/927984 MSC/Fike|Y
01|187798|1|1|Please Note: Net price quoted and includes RFID chip|Y
01|187798|1|2|chip hole and installation of BIS-C-122-04/L|Y
01|187798|1|3|etched with part number CS-027-308-001.|Y
01|187798|2|1|Included in price of NCAT50-SK25C-105U-IDI.|Y
01|187798|3|1|Included in price of NCAT50-SK25C-105U-IDI.|Y
01|187798|5|1|Part # CS-027-309-001 to be etched on collet at no|Y
01|187798|5|2|charge.|Y
01|187802|1|1|installed with pull stud at factory|Y
01|187802|2|1|Installed on NC5-46-SK10C-75|Y
01|187802|8|1|installed with pull stud at factory|Y
01|187802|9|1|Installed on NC5-46-C12-55|Y
01|187802|13|1|installed with pull stud at factory|Y
01|187802|14|1|Installed on NC5-46-C16-70|Y
01|187816|1|1|P/N: C8-C2-90|Y
01|187816|1|2|Capto 8 taper 2 Milling Chuck w 90mm gauge length|Y
01|187819|1|1|Replacement for Lyndex-Nikken RGA# OIE-58945|Y
01|187829|4|1|**To hold the 6mm / .236|Y
01|187835|1|1|ref s./n.15998NT|Y
01|187835|1|2|Shipping from Japan is by boat|Y
01|187835|1|3|If air is required additional air cost to be added|Y
01|187842|57|1|Please Note: This kit might cover all of the boring|Y
01|187842|57|2|items they have requested.|Y
01|187842|63|1|SP26-16-140-A1 Modular Boring Bar Spacer|Y
01|187842|64|1|16-ZMAC32-55AAV >> Modular Type ZMAC Boring Head|Y
01|187842|64|2|Boring Range 31.8~42.2|Y
01|187842|65|1|16-ZMAC32R-55AAV  Modular Type ZMAC Boring Head|Y
01|187842|65|2|Rhomboid Insert Type Head  for Hi-Speed/Deep Hole|Y
01|187842|65|3|Boring. Boring Range 31.8~42.2|Y
01|187842|71|1|20-ZMAC42-70AAV  Modular Type ZMAC Boring Head|Y
01|187842|71|2|Boring Range 41.8~55.2|Y
01|187842|72|1|20-ZMAC42R-70AAV Modular Type ZMAC Boring Head|Y
01|187842|72|2|Rhomboid Insert Type Head  for Hi-Speed/Deep Hole|Y
01|187842|72|3|Boring. Boring Range 41.8~55.2|Y
01|187842|78|1|26-ZMAC55-70AAV  Modular Type ZMAC Boring Head|Y
01|187842|78|2|Boring Range 54.8~70.2|Y
01|187842|79|1|26-ZMAC55R-70AAV  Modular Type ZMAC Boring Head|Y
01|187842|79|2|Rhomboid Insert Type Head  for Hi-Speed/Deep Hole|Y
01|187842|79|3|Boring. Boring Range 54.8~70.2|Y
01|187846|1|1|RGA#LVR-58849/|Y
01|187846|1|2|Repair of OKEX-ER32Z s/n:AL0185 (Alps#OKA00-20000)|Y
01|187846|2|1|Bearings. o-rings collet nut and spindle to be|Y
01|187846|2|2|replaced. If the spindle can be reused the cost will|Y
01|187846|2|3|be $1617.20|Y
01|187858|1|1|There is a 6 to 8 week lead time on this item ARO.|Y
01|187874|1|1|Quoted at NET Price.|Y
01|187874|1|2|193086 is considered a non stock item. Once an order|Y
01|187874|1|3|is placed it cannot be cancelled or returned.|Y
01|187883|2|1|Included with the shrink fit System|Y
01|187883|6|1|Included with the FI6 unit.|Y
01|187905|1|1|Please Note: Delivery is based upon receipt of order|Y
01|187905|1|2|after final approval drawing is signed and received.|Y
01|187905|1|3|This item is Special once a purchase order is|Y
01|187905|1|4|placed it cannot be cancelled or returned.|Y
01|187905|1|5|Mimatic Part # 198884|Y
01|187936|1|1|RGA#CUR-58605/|Y
01|187936|1|2|Repair of C8-MRAM-IC s/n:65161 01 (Mimatic#162821)|Y
01|187936|2|1|Bearings seals o-rings and coolant sealing system to|Y
01|187936|2|2|be replaced.|Y
01|187936|4|1|RGA#CUR-58605/|Y
01|187936|4|2|Reapir of MRAM-MI40L-IC s/n:65611 02 (Mimatic#159995)|Y
01|187936|5|1|Bearings seals and o-rings to be replaced. Resurface|Y
01|187936|5|2|1 output spindle.|Y
01|187936|7|1|RGA#CUR-58605/|Y
01|187936|7|2|Repair of PA110-CAT sn:n/a (Mimatic#162745)|Y
01|187936|8|1|Missing bolts & o-ring to be replaced|Y
01|187958|1|1|1st Batch/5/9/22:DWG Approved/TR18wks(9/M)>9/30>10/30|Y
01|187958|2|1|1st Batch/for stock 7/18/22 approved by Tim11/30mfg>>(|Y
01|187958|3|1|1st Batch/for stock   3/122  approved by Tim7/15>>7/30|Y
01|187958|4|1|1st Batch/Stock 12/23/21:DWG Approved/BT16wks(4/M~E)>>|Y
01|187976|1|1|*Order as part# HSK63A-ER20-100-BN|Y
01|187976|1|2|HSK63A ER20 Collet Chuck HighTorque Bearing Nut|Y
01|187976|1|3|Cannot be cancelled or returned.|Y
01|187994|1|1|310mm Center Height would require 25mm Riser to match|Y
01|187994|2|1|310mm Center Height would require 25mm Riser to match|Y
01|187994|3|1|Heidenhain Rotary Scale and Mounting Kit|Y
01|187995|1|1|TAR-58787|Y
01|187995|1|2|5AX-350FA-RCN2 SN: 3996|Y
01|187995|1|3|TILT AXIS NEEDS FULL REBUILD|Y
01|187995|1|4|FIX ROTARY AXIS COOLANT LEAKING|Y
01|187997|1|1|Includes Power and Feed back Cables from Nikken|Y
01|187997|1|2|Table to Machine Bulkhead|Y
01|188004|15|1|Torque wrench handle and attachment for the smooth nut|Y
01|188004|15|2|ER25 holders lines 3 and 7|Y
01|188004|16|1|Wrench for the  NCAT40-SK6C-120UP-IDU|Y
01|188004|17|1|Wrench for C4007-0025-4.00|Y
01|188022|1|1|PLEASE NOTE:H63A-SF12-120CP is a non stock tool. Once|Y
01|188022|1|2|an order is placed it cannot be cancelled or returned.|Y
01|188025|1|1|Balance ETA 9 Weeks|Y
01|188025|2|1|Balance ETA 9 weeks|Y
01|188031|1|1|RGA#LVR-58893/|Y
01|188031|1|2|Repair of BMT65-SK20Z-ICE s/n:19904757 02|Y
01|188031|1|3|(Mimatic#192968)|Y
01|188031|2|1|Bearings seals and o-rings to be replaced.|Y
01|188033|3|1|Parameter setting.|Y
01|188033|3|2|If this is next generation control 3RD part software|Y
01|188033|3|3|option from Haas is required.|Y
01|188037|1|1|RGA#CUR-58927/|Y
01|188037|1|2|Repair of C50RAM-MI63-215-110TP s/n: 94853 01|Y
01|188037|1|3|(Mimatic#178153)|Y
01|188037|2|1|Lockdown studs nuts spacers & washers to be replaced.|Y
01|188041|1|1|RGA#LVR-58921/|Y
01|188041|1|2|Repair of MZQT47-ER32X-OFS s/n:97616 01|Y
01|188041|1|3|(Mimatic#124375)|Y
01|188041|2|1|Bearings seals and o-rings to be replaced.|Y
01|188063|1|1|INS Req'd:Give 1p to SVC|Y
01|188065|1|1|Cheersun AIR #10242201-A/No INS Req'd.|Y
01|188065|2|1|Cheersun AIR #10242201-A/No INS Req'd.|Y
01|188065|3|1|Cheersun AIR #10242201-A/No INS Req'd.|Y
01|188076|12|1|NBT40-C32-85G|Y
01|188076|15|1|PS-75 retention knob|Y
01|188076|20|1|SK13-7A|Y
01|188076|26|1|SKG-12-55L|Y
01|188076|28|1|SKG-15|Y
01|188078|1|1|Table comes with a built in rotary union and a pancake|Y
01|188078|1|2|cylinder for each spindle.  All cylinders have threaded|Y
01|188078|1|3|drawbars included and actuate simultaneously.|Y
01|188079|1|1|Part#:HSK80F/LPM-SK6-90U-IDU|Y
01|188079|1|2|HSK80F SK6 Slim Chuck IdChipHole w/Makino pins|Y
01|188079|1|3|1-9pcs >> $593 NET/EA|Y
01|188079|1|4|10-19pcs >> $579 NET/EA|Y
01|188079|2|1|Part#:HSK80F/LPM-SK16-90U-IDU|Y
01|188079|2|2|HSK80F SK16 Slim Chuck IdChipHole w/Makino Pins|Y
01|188079|2|3|1-9pcs >> $615 NET/EA|Y
01|188079|2|4|10-19pcs >> $599 NET/EA|Y
01|188086|5|1|POSITIONING BLOCK MADE TO SPINDLE SPECIFICATIONS|Y
01|188086|5|2|SPINDLE DRAWING AND/OR MEASUREMENTS REQUIRED.|Y
01|188088|15|1|Torque wrench handle and attachment for the smooth nut|Y
01|188088|15|2|ER25 holders lines 3 and 7|Y
01|188088|16|1|Wrench for the  NCAT40-SK6C-120UP-IDU|Y
01|188088|17|1|Wrench for C4007-0025-4.00|Y
01|188104|23|1|refurbish rotary joint shaft|Y
01|188109|5|1|wrench handle and attachment head if do not already own|Y
01|188114|1|1|**** No Safety Recess. Body may interfere with ATC Arm.|Y
01|188121|3|1|Includes 4th axis Interface Power & Feedback Cables|Y
01|188121|3|2|from Nikken Table Installation and Travel|Y
01|188168|2|1|Cable Sets Included|Y
01|188193|1|1|There is a 4 to 6 week lead time on this item.|Y
01|188202|1|1|PLEASE NOTE:124305 is considered a non stock item.|Y
01|188202|1|2|Once an order is placed it cannot be cancelled|Y
01|188202|1|3|or returned.|Y
01|188202|1|4|*Quoted at NET price|Y
01|188206|1|1|1st Batch *Please provide the drawingIn stock 11/11A|Y
01|188206|2|1|\1st Batch *Please provide the drawing(10)In stock 11|Y
01|188206|3|1|1st Batch *Please provide the drawing|Y
01|188218|1|1|DELIVERY:3pcs ETA End of Dec // Bal ETA End of Jan|Y
01|188226|1|1|RGA#LVR-58913/|Y
01|188226|1|2|Repair of OKL3-ER32Z-OFS s/n:AL003 (Alps#OK109-14001)|Y
01|188226|2|1|Bearings o-rings collet nut and spindle to be|Y
01|188226|2|2|replaced. If the spindle can be reused the cost will|Y
01|188226|2|3|be $1887.60|Y
01|188236|1|1|DELIVERY: 15 Stk Jpn ETA 2wks; bal 3mos MFG + 2wks ship|Y
01|188238|1|1|Mazak Servo Motor HC-H104T|Y
01|188238|1|2|Part# B78009|Y
01|188238|2|1|Encoder for Mazak Servo Motor OSA24RS|Y
01|188238|2|2|Part# B55044|Y
01|188245|1|1|Mimatic #197602|Y
01|188254|1|1|Includes cable set & Fanuc Motor|Y
01|188254|4|1|4 Jaw manual scroll chuck & adapter plate|Y
01|188254|7|1|Includes complete install + interface|Y
01|188258|1|1|P/N: TBD  OKE4-STC5X-OFF-C|Y
01|188258|1|2|Okuma Static C5 X-Axis STRT<Side> BMT Offset|Y
01|188258|1|3|Ext Coolant.|Y
01|188258|2|1|P/N: TBD OKE4-STC5Z-90-C|Y
01|188258|2|2|Okuma Static C5 Z-Axis 90Deg<Face> BMT Ext Coolant|Y
01|188258|3|1|P/N: OKE4-C4Z-85-ICE|Y
01|188258|3|2|Okuma Live BMT60;S1=76mm Drive Tang Length|Y
01|188258|3|3|CAPTO 4; 90Deg Head;L1=85mm;INT/EXT Coolant/ Ice|Y
01|188258|3|4|Max 1015PSI; 1:1Fear; Max 10K RMP; Max 70Nm;|Y
01|188258|16|1|7pcs stock 5pcs 3-4wks bal 8-10wks|Y
01|188258|17|1|4pcs stock 2pcs 3-4wks bal 8-10wks|Y
01|188299|1|1|Req. INS/Not Purchase since 2014|Y
01|188299|1|2|Using CASE#170958 instead 170957 is out of stock.|Y
01|188308|1|1|5AX-130BAWA21 with two NIkken controllers for M-code|Y
01|188308|1|2|activation.|Y
01|188308|2|1|5AX-130BAYABR table with motors and cables from table|Y
01|188308|2|2|to junction box.|Y
01|188331|1|1|RGA#LVR-58924/|Y
01|188331|1|2|Repair of MSA01-3W000 s/n: A0020|Y
01|188331|2|1|Bearings o-rings collet nut and spindle to be|Y
01|188331|2|2|replaced. If the spindle can be reused the cost will|Y
01|188331|2|3|be $2494.40|Y
01|188331|4|1|RGA#LVR-58924/|Y
01|188331|4|2|Repair of MSA01-3W000 s/n: A0023|Y
01|188331|5|1|Bearings o-rings collet nut and spindle to be|Y
01|188331|5|2|replaced. If the spindle can be reused the cost will|Y
01|188331|5|3|be $2494.40|Y
01|188339|1|1|Minimum Quanity order is 3-pieces.|Y
01|188339|1|2|Delivery is based upon receipt of purchase order after|Y
01|188339|1|3|final appproval drawing is signed and returned to L-N.|Y
01|188339|1|4|Once a purchase order is placed it cannot be cancelled|Y
01|188339|1|5|or returned.|Y
01|188364|1|1|Item is non-standard stock and can not be cancelled|Y
01|188364|1|2|or returned.|Y
01|188369|1|1|Includes (2)BT30 Tool Pots|Y
01|188371|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|188372|2|1|This item is special once ordered cannot be cancelled|Y
01|188372|2|2|or returned.|Y
01|188372|4|1|This item is special once ordered cannot be cancelled|Y
01|188372|4|2|or returned.|Y
01|188378|6|1|This is a standard installation and training one time|Y
01|188378|6|2|cost.  However this fee is being waived by Chris|Y
01|188378|6|3|Blaine as he will perform installation and training|Y
01|188378|6|4|for customer as a thank you and added cost savings.|Y
01|188379|1|1|1st Batch(w/ScrewOnKey)|Y
01|188379|2|1|1st Batch(w/ScrewOnKey)|Y
01|188379|3|1|1st Batch(w/ScrewOnKey)|Y
01|188379|4|1|Req.INS:Need to check dual contact tolerance.|Y
01|188379|5|1|Req.INS:Need to check dual contact tolerance.|Y
01|188379|6|1|Req.INS:Need to check dual contact tolerance.|Y
01|188381|5|1|TDT Addon - TDT allows for scanning tools and for|Y
01|188381|5|2|offset data to be transferred to a machine tool which|Y
01|188381|5|3|streamlines the tool set up process and potential for|Y
01|188381|5|4|human errors when transferring data from presetter to|Y
01|188381|5|5|the machine.|Y
01|188381|6|1|This is a standard installation and training one time|Y
01|188381|6|2|fee/cost.  However this fee is being waived by Chris|Y
01|188381|6|3|Blaine as he will perform installation and training|Y
01|188381|6|4|for the customer as a thank you and added cost savings.|Y
01|188389|2|1|Discount reflects a minimum purchase order of|Y
01|188389|2|2|3 spindle speeders.|Y
01|188389|4|1|Quoted at NET price.|Y
01|188418|1|1|On QF for P&D|Y
01|188418|2|1|On QF for P&D|Y
01|188419|2|1|Heidenhain scale for rotary axis with mounting kit.|Y
01|188432|1|1|Boeing Sheffield|N
01|188434|1|1|Req.INS:Need to check dual contact tolerance.|Y
01|188434|2|1|Req.INS:Need to check dual contact tolerance.|Y
01|188434|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|188434|4|1|Req.INS:Need to check dual contact tolerance.|Y
01|188434|5|1|Req.INS:Need to check dual contact tolerance.|Y
01|188449|1|1|*Holder is non standard stock once a purchase order|Y
01|188449|1|2|is placed it cannot be cancelled or returned.|Y
01|188450|1|1|Core Trade In|Y
01|188450|2|1|RGA#TAR-58923|Y
01|188450|2|2|CNCZ202LFA SN:20014T|Y
01|188456|9|1|INCLUDES 8 TOTAL HOURS TO INSTALL & TRAIN|Y
01|188460|9|1|INCLUDES 8 TOTAL HOURS TO INSTALL & TRAIN|Y
01|188465|1|1|L-N Part # K1.1/4-SK20-150|Y
01|188465|1|2|Straight Shank Extension OD1.1/4 SK20 Slim Chuck|Y
01|188465|1|3|Please Note: This tooling is non standard stock. Once|Y
01|188465|1|4|a purchase order is placed it cannot be cancelled|Y
01|188465|1|5|or returned.|Y
01|188465|1|6|Price reflects a purchase order of 1~9 tools.|Y
01|188465|2|1|L-N Part # K1.1/4-SK20-150|Y
01|188465|2|2|Straight Shank Extension OD1.1/4 SK20 Slim Chuck|Y
01|188465|2|3|Please Note: This tooling is non standard stock. Once|Y
01|188465|2|4|a purchase order is placed it cannot be cancelled|Y
01|188465|2|5|or returned.|Y
01|188465|2|6|Price reflects a minimum purchase order of 10 tools.|Y
01|188468|51|1|Requires Smooth Nut TQW-HANDLE14X18 & TQW-E32-G Wrench.|Y
01|188471|1|1|*DIN Modified***non-cancelable non-returnable after|Y
01|188471|1|2|receipt of PO|Y
01|188479|2|1|EXTERNAL POWER/FEEDBACK CABLES INCLUDED WITH COST|Y
01|188479|2|2|OF THE CNC180 ROTARY TABLE.|Y
01|188479|3|1|DRIVE BULKHEAD WIRING AND CONNECTORS ARE ALREADY|Y
01|188479|3|2|PRESENT; THIS INSTALLATION FEE OF $4500 WILL COVER|Y
01|188479|3|3|LABOR COST TRAVEL AND LODGING EXPENSES FOR L-N|Y
01|188479|3|4|SERVICE TECHNICIAN.|Y
01|188486|1|1|HFO to supply motor.|Y
01|188486|2|1|Includes Haas Motor and Cables.|Y
01|188490|1|1|RGA#TAR-58955|Y
01|188490|1|2|CNC200LFA SN:8653|Y
01|188495|1|1|TAR-58953|Y
01|188495|1|2|CNCZ201LSA3 SN: N/A|Y
01|188495|3|1|REBUILD OF SANYO P50B08050DXS00|Y
01|188500|1|1|installed with pull stud at factory.|Y
01|188500|1|2|Must Ship With Pull Stud/Retention Knob installed.|Y
01|188500|2|1|Installed on NC5-46-C20-80|Y
01|188501|1|1|CNC1000FA-M - 1000mm Faceplate - Hydraulic Clamping|Y
01|188501|2|1|CNC1200FA-M - 1200mm Faceplate - Hydraulic Clamping|Y
01|188501|3|1|Rotary Scale and Installation Kit|Y
01|188507|1|1|1FK70832AF711CH0|Y
01|188507|1|2|Table can be used vertically or horizontally.|Y
01|188507|1|3|Please specify table orientation when ordering.|Y
01|188507|2|1|Motor#1FK70422AF711CH0|Y
01|188509|2|1|Please advise your customer: This tooling can only be|Y
01|188509|2|2|run in a Dual Contact or BIG spindle. It will not|Y
01|188509|2|3|work in a standard CAT50 spindle.|Y
01|188509|2|4|Discount reflects non returnable tooling.|Y
01|188509|3|1|NCAT50-MMC8C-105U-IDU  >> Dual Contact|Y
01|188509|3|2|CAT50 10mm Mini-Mini Chuck Bevel Gear Type Coolant|Y
01|188509|3|3|20000rpm G2.5|Y
01|188509|3|4|Please Note: The NCAT50-MMC8C-105U-IDU is non standard|Y
01|188509|3|5|stock. Once a purchase order is placed it cannot be|Y
01|188509|3|6|cancelled or returned.|Y
01|188509|3|7|Pricing reflects an order of 1~9 toolholders.|Y
01|188509|4|1|NCAT50-MMC8C-105U-IDU  >> Dual Contact|Y
01|188509|4|2|CAT50 10mm Mini-Mini Chuck Bevel Gear Type Coolant|Y
01|188509|4|3|20000rpm G2.5 .|Y
01|188509|4|4|Please Note: The NCAT50-MMC8C-105U-IDU is non standard|Y
01|188509|4|5|stock. Once a purchase order is placed it cannot be|Y
01|188509|4|6|cancelled or returned.|Y
01|188509|4|7|Pricing reflects an order of 10~19 toolholders.|Y
01|188511|1|1|part# C1TA140 H-492|Y
01|188511|1|2|Howa Chuck Cylinder HH35C 8|Y
01|188515|3|1|Please Note: This holder is coolant thru the flange.|Y
01|188515|3|2|We can plug the coolant holes and they will work just|Y
01|188515|3|3|fine. Discount reflects non returnable tooling.|Y
01|188522|1|1|RGA#LVR-58949/|Y
01|188522|1|2|Repair of BMT55-SK20Z-85-ICE-CCW s/n:90068 06|Y
01|188522|1|3|(Mimatic#190609)|Y
01|188522|2|1|Bearings seals and o-rings to be replaced.|Y
01|188543|1|1|Includes Haas Motor and Cables.|Y
01|188549|1|1|should work to hold the .855|Y
01|188549|2|1|Use for to hold the .863|Y
01|188550|1|1|Nikken Table includes Power and Feedback cables from|Y
01|188550|1|2|to Machine Bulkhead|Y
01|188550|4|1|Please note - Price is NET to Morris South|Y
01|188550|5|1|Please note - Price is NET to Morris South|Y
01|188550|6|1|Please note - Price is NET to Morris South|Y
01|188562|3|1|Modification charges are quoted at NET price.|Y
01|188567|2|1|In stock alternative size|Y
01|188568|1|1|C5006-1250-12.00 CAT50 End Mill Holder 1.1/4 with|Y
01|188568|1|2|12.00 gage length.|Y
01|188568|1|3|Price quoted is for a minimum order of 3 toolholders.|Y
01|188568|2|1|C5006-1250-12.00 CAT50 End Mill Holder 1.1/4 with|Y
01|188568|2|2|12.00 gage length.|Y
01|188568|2|3|Price quoted is for a minimum order of 5 toolholders.|Y
01|188578|1|1|MZST68-ER25X-OFF-C|Y
01|188578|1|2|MIM#177631   Drawing#40849|Y
01|188578|1|3|MAZAK LIVE BMT68 ER25; STRAIGHT OFFSET;|Y
01|188578|1|4|OFFSET V=62.5mm; INT/EXT COOLANT - NO DRY RUN;|Y
01|188578|1|5|1:1.5 GEAR; MAX IN 7000RPM; MAX OUT 10500RPM;|Y
01|188578|1|6|REF DRWG # 00040849|Y
01|188578|1|7|MACHINE INFO: QTS200M|Y
01|188578|1|8|SPECIAL ORDER ITEM NON_CANCELABLE AND NON_-RETURNABLE|Y
01|188578|1|9|AFTER RECEIPT OF PO|Y
01|188578|1|10|ETA 2-3 WEEKS  ARO (1PC IN STOCK OVERSEAS)|Y
01|188590|16|1|Alternative to 6.30|Y
01|188600|1|1|TAR-58455|Y
01|188600|1|2|5AX-200TD-OSP4-M SN: 1794|Y
01|188609|1|1|Price includes modification charges|Y
01|188609|2|1|Modification charge reflected in price of holder above.|Y
01|188633|3|1|TAR-58961|Y
01|188633|3|2|CNCZ202FA SN: 12079T|Y
01|188644|33|1|Extra - Not necessary as a free 032-SPAN is included|Y
01|188644|33|2|from section above.|Y
01|188644|59|1|Extra - Not necessary as a 9HC22 was included free in|Y
01|188644|59|2|section above.|Y
01|188655|1|1|NBT50-MMC12C-165-AA|Y
01|188655|1|2|BT50 2Lock 12mm Mini-Mini Chuck Coolant 20000rpm G2.5|Y
01|188655|1|3|Advanced Alpha|Y
01|188658|4|1|wire for power from machine to breaker for HPU|Y
01|188661|2|1|Cable set|Y
01|188661|5|1|Mazak|N
01|188669|1|1|4th and 5th axis 4-spindle rotary table  with built-in|Y
01|188669|1|2|rotary union for rotary axis brake supply and optional|Y
01|188669|1|3|cylinders.|Y
01|188682|1|1|RGA#LVR-58450/|Y
01|188682|1|2|Repair of MZMP5-ER40Z-ICE s/n:77431 02 (Mimatic#131597)|Y
01|188682|2|1|Bearings seals and o-rings to be replaced.|Y
01|188694|1|1|Part# MZQT5-ER32Z-MD|Y
01|188694|1|2|Mazak Live ER32 Z-Axis 90Deg Horizontal MainDual ExtCoo|Y
01|188694|1|3|L=170/160mm; 1:1 GEAR MAX 15Nm; 6500 RPM|Y
01|188694|1|4|2 pc price = $12670.96 net each|Y
01|188706|1|1|RGA#TOR-58960/|Y
01|188706|1|2|Repair of BT40-C3/4-70(Tool#1)|Y
01|188706|7|1|RGA#TOR-58960/|Y
01|188706|7|2|Repair of BT40-C3/4-70(Tool#2)|Y
01|188706|12|1|RGA#TOR-58960/|Y
01|188706|12|2|Repair of BT40-C3/4-70(Tool#3)|Y
01|188712|1|1|1st Batch/ 9/9:DWG Approved/BT|Y
01|188712|2|1|1st Batch/CBO Install E16-NUT-G & ER16-SCREW(C)|Y
01|188712|3|1|Req. INS/925514 GKN-KS 9/19:DWG Approved by Customer|Y
01|188712|3|2|1st time purchase by GKN-KS|Y
01|188713|1|1|Final Assembly: CAT40-RAC70-180E|Y
01|188713|1|2|Combination of CAT40-Q34-95U + 34-RAC70-85E|Y
01|188713|3|1|Final Assembly: CAT40-ZMAC70-165V|Y
01|188713|3|2|Combination of CAT40-Q34-95U + 34-ZMAC70-70V|Y
01|188722|4|1|KM42-1.7/16 // Straight Collet/Sleeve OD42mm ID 1.7/16|Y
01|188722|4|2|Drawing Approval required prior to starting mfg|Y
01|188724|1|1|RGA#TAR-58870|Y
01|188724|1|2|5AX-130FA-M SN:1261|Y
01|188724|52|1|TCE-3FAA21T(WX)|Y
01|188724|53|1|TCE-93788(1)-J2|Y
01|188724|54|1|TCE-120FAA21C(WX)|Y
01|188730|1|2|`|N
01|188730|2|1|Quoted at Net Price.|Y
01|188742|1|1|Ref. Drawing# 124372 w/ input drive length: 117.55mm|Y
01|188742|1|2|Straight Offset for Main and Sub Spindles|Y
01|188742|1|3|ER32 outputs|Y
01|188742|1|4|External Coolant Supply|Y
01|188742|1|5|supplied with wrenches|Y
01|188742|1|6|Machine: Haas DS30|Y
01|188742|1|7|Special pricing for 1pc only. Any additional qty needed|Y
01|188742|1|8|must be requoted.|Y
01|188745|1|1|Final Assembly: CAT40-RAC70-180E|Y
01|188745|1|2|Combination of CAT40-Q34-95U + 34-RAC70-85E|Y
01|188745|3|1|Final Assembly: CAT40-ZMAC70-165V|Y
01|188745|3|2|Combination of CAT40-Q34-95U + 34-ZMAC70-70V|Y
01|188755|1|1|RGA#TAR-58671|Y
01|188755|1|2|5AX-130FA-M SN:5024|Y
01|188760|19|1|CCK16-1/2|Y
01|188760|19|2|CCK16 Coolant Collet for 1/2|Y
01|188823|1|1|Replacements for unrepairable tools #4 and #5|Y
01|188828|3|1|Alternate to N4007-0011-2.00|Y
01|188835|1|1|DELIVERY: 5 in stk / Bal 14-15wks ARO|Y
01|188835|1|2|PLEASE NOTE:NC5006-40-4.50 is considered a special item|Y
01|188835|1|3|Once an order is placed it cannot be cancelled or|Y
01|188835|1|4|returned.|Y
01|188838|1|1|Part # OKL4-MI50Z-C|Y
01|188838|1|2|OKUMA LIVE; STRAIGHT MI50 QUICK CHANGE;|Y
01|188838|1|3|VDI40 SIN ISO 10889(DIN 69880);|Y
01|188838|1|4|OKUMA CLUTCH 1 STEPPED 30/30 PITCH|Y
01|188838|1|5|L1=85mm;|Y
01|188838|1|6|1:1 GEAR MAX 80Nm; MAX 6500RPM; 1015 PSI;|Y
01|188838|1|7|REF DRWG # 00025129|Y
01|188838|1|8|3 pc price $3373.38 net each   - ETA 10-12 Weeks|Y
01|188838|1|9|5 pc price $3273.68 net each   - ETA 10-12 Weeks|Y
01|188865|1|1|RGA#LVR-58932/|Y
01|188865|1|2|Repair of MNL12-ER40X s/n:A0196 (Alps#T32213)|Y
01|188865|2|1|Bearings o-rings collet nut and spindle to be|Y
01|188865|2|2|replaced.|Y
01|188872|1|1|Part # C1B115M-4774|Y
01|188877|1|1|Direct match to Velocity 14.910.0.0212.0|Y
01|188917|2|1|3-5pc pricing|Y
01|188917|2|2|OKUMA LIVE VDI30; ER16; ADJ +/-107DEG|Y
01|188917|2|3|INT/EXT COOLANT/ ICE|Y
01|188917|2|4|L=125mm|Y
01|188917|2|5|1:1 GEAR MAX 12Nm; 6500 RPM|Y
01|188917|5|1|3-5pc pricing|Y
01|188917|5|2|OKUMA LIVE VDI30; ER16; ADJ +/-107DEG|Y
01|188917|5|3|INT/EXT COOLANT/ ICE;|Y
01|188917|5|4|L=125mm;|Y
01|188917|5|5|1:2 GEAR MAX 6Nm; MAX IN 6500 RPM;MAX OUT 13K RPM|Y
01|188919|1|1|HSK63A-SF16-160B-CP-M|Y
01|188919|1|2|HSK63A Shrink Fit Holder 16mm Balanceable Heavy-Duty|Y
01|188919|1|3|With Coolant Ports.|Y
01|188919|3|1|Shrink fit package for SF-START2-UNIT-380|Y
01|188919|3|2|x10 Holders included with Shink fit unit Package|Y
01|188919|4|1|Included with package|Y
01|188921|16|1|BT30 ER16 Angle head|Y
01|188921|16|2|Non-returnable/non-cancellable|Y
01|188931|5|1|Form Tap|Y
01|188931|6|1|Form Tap|Y
01|188931|7|1|Form Tap - Coolant Collet Option|Y
01|188931|8|1|Form Tap|Y
01|188931|9|1|Form Tap - Coolant Collet Option|Y
01|188931|10|1|Form Tap|Y
01|188931|11|1|Form Tap - Coolant Collet Option|Y
01|188931|12|1|Form Tap|Y
01|188931|13|1|Form Tap - Coolant Collet Option|Y
01|188931|16|1|SAE Tap|Y
01|188931|17|1|SAE Tap - Coolant Collet Option|Y
01|188931|18|1|SAE Tap|Y
01|188931|19|1|SAE Tap - Coolant Collet Option|Y
01|188931|20|1|SAE Tap|Y
01|188931|21|1|SAE Tap - Coolant Collet Option|Y
01|188931|22|1|SAE Tap|Y
01|188931|23|1|SAE Tap - Coolant Collet Option|Y
01|188931|26|1|Pipe Tap 5078977|Y
01|188931|27|1|Pipe Tap 5078980|Y
01|188931|28|1|Pipe Tap 5078976|Y
01|188931|33|1|CAT40 SK16 Holder 1 SK16 1/2 Collet and Wrench @NC|Y
01|188931|33|2|Gifted by Chris Blaine|Y
01|188943|1|1|RGA#TAR-58939|Y
01|188943|1|2|CNC260TFA SN:9540|Y
01|188943|15|1|RE-GRIND INTERNAL ITEMS|Y
01|188943|15|3|FACEPLATE/BRAKE SYSTEM|Y
01|188945|2|1|TCE-A3043/TCE-94200 Cable set|Y
01|188945|3|1|CNC180-2W-250FA repair cost at the worst senario|Y
01|188945|5|1|CNC180LFA match s/n.15972 W/O groove and extra work|Y
01|188945|6|1|TCE-A3016/4 Direct mount power cable|Y
01|188945|7|1|TCE-94828/1 Direct mount feedback table|Y
01|188945|8|1|CNC180LFA repair cost at the worst senario|Y
01|188945|10|1|CNC202-2W-250FA repair cost at the worst senario|Y
01|188948|10|1|Mimatic Part# 191923 HSK100A ADJ AGH (0-98DEG); ER32;|Y
01|188948|10|2|Pitch A=110mm ; Lyndex Taper pin;|Y
01|188948|10|3|Internal coolant|Y
01|188948|10|4|**This item is considered special once ordered it|Y
01|188948|10|5|cannot be cancelled or returned.|Y
01|188952|1|1|MZMP5-C5Z-160-ICE|Y
01|188952|1|2|Mazak Live CAPTO5 Z-Axis 90Deg Horizontal;|Y
01|188952|1|3|Int/ExtCoolant / ICE;|Y
01|188952|1|4|CENTER HEIGHT L1=160mm;|Y
01|188952|1|5|1:1 GEAR ; MAX 100Nm; MAX 6500 RPM;|Y
01|188952|1|6|REF DRWG# 58123|Y
01|188952|1|7|MIM#197612|Y
01|188952|1|8|ETA - 3 pcs 18-19 WKS - Additional pcs 28-29 WKS|Y
01|188952|1|9|SPECIAL ORDER Non-cancelable/Non-Returnable|Y
01|188955|1|1|MZMP5-C5Z-160-ICE|Y
01|188955|1|2|Mazak Live CAPTO5 Z-Axis 90Deg Horizontal;|Y
01|188955|1|3|Int/ExtCoolant / ICE;|Y
01|188955|1|4|CENTER HEIGHT L1=160mm;|Y
01|188955|1|5|1:1 GEAR ; MAX 100Nm; MAX 6500 RPM;|Y
01|188955|1|6|REF DRWG# 58123|Y
01|188955|1|7|MIM#197612|Y
01|188955|1|8|ETA - 3 pcs 18-19 WKS - Additional pcs 28-29 WKS|Y
01|188955|1|9|SPECIAL ORDER Non-cancelable/Non-Returnable|Y
01|188962|1|1|C4006-20-3.00DIN-M 2 DIN holes added as modification|Y
01|188990|31|1|105mm = 4.13 in GL|Y
01|188990|32|1|165mm = 6.5in GL|Y
01|188990|49|1|SK20-11/16AC >> SK20 Slim Chuck Collet 11/16 On Size|Y
01|188990|49|2|Mechanical Coolant Seal|Y
01|188990|49|3|PLEASE NOTE:SK20-11/16AC is a non stock item. Once|Y
01|188990|49|4|an order is placed it cannot be cancelled or returned.|Y
01|188990|49|5|Signed drawing will be required prior to manufacturing.|Y
01|188990|61|1|PLEASE NOTE:SK20-13AC is a non stock item. Once an|Y
01|188990|61|2|order is placed it cannot be cancelled or returned.|Y
01|188990|62|1|DELIVERY: 2pcs ETA 2-3wks / Bal 15-16wks ARO|Y
01|188990|62|2|PLEASE NOTE:SK20-14AC is a non stock item. Once an|Y
01|188990|62|3|order is placed it cannot be cancelled or returned.|Y
01|188990|63|1|PLEASE NOTE:SK20-15AC is a non stock item. Once an|Y
01|188990|63|2|order is placed it cannot be cancelled or returned.|Y
01|188990|65|1|PLEASE NOTE:SK20-17AC is a non stock item. Once an|Y
01|188990|65|2|order is placed it cannot be cancelled or returned.|Y
01|188998|1|1|Item marked 82/C on drawing TCD-A3133_0|Y
01|189085|2|1|Net ea modification option|Y
01|189088|1|1|Order part as C4001-0750-4.00CP-DIN-M (2 DIN Holes)|Y
01|189088|1|2|Once ordered cannot be cancelled or returned|Y
01|189088|1|3|Net ea priceno additional discount|Y
01|189099|2|1|GLASS SCALES ON TILT AXIS|Y
01|189099|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|189106|1|1|INSTALLATION KIT MINUS AMPLIFIER|Y
01|189106|1|2|EXTERNAL CABLES/INTERFACE CABLES|Y
01|189106|1|3|FIBER OPTIC/RELAYS AND ACCESSORIES|Y
01|189106|1|4|FOR CNC302FA-M ON YAMA SEIKI/AWEA AF1000|Y
01|189116|1|1|Req. INS/To check Sharp Edge *Ref. Hiro's Email on 1/1|Y
01|189116|2|1|1st Batch/for stock 3/28/22 approved by TimMFG7/30>11/|Y
01|189116|3|1|1st Batch/for stock  1/17 approved by BenMFG4/30>11/E#|Y
01|189116|4|1|1st Batch for stock 12/28 approved by TimMFG4/30>11/E#|Y
01|189116|5|1|Req.INS/T/P Inspection RequiredMFG10/30UPD10/18>11/23~|Y
01|189116|6|1|Req.INS/T/P Inspection Required(20)3/30A 1st Batch(10)|Y
01|189116|7|1|Req.INS/T/P Inspection RequiredMFG16wks(4/M~E)>10/E#6U|Y
01|189126|2|1|Installation includes: Drive unit short bar fiber|Y
01|189126|2|2|optic cables bulkhead cables external cables|Y
01|189126|2|3|parameter changes service time and travel.|Y
01|189131|4|1|4 Port Rotary Union / SAE Fittings and Caps / Mounting|Y
01|189131|4|2|Anti-Rotate Bracket / Sheet Metal Fillers x 2|Y
01|189147|1|1|Installation includes: Drive unit short bar fiber|Y
01|189147|1|2|optic cables bulkhead cables external cables|Y
01|189147|1|3|parameter changes service time and travel.|Y
01|189155|1|1|Replaces discontinued part #C4001-1000-1.75|Y
01|189158|4|1|Quoted as an in stock alternative to 4 on line 3|Y
01|189189|4|1|Package includes: Cabling from E-box to turning wall|Y
01|189189|4|2|cabling from turning wall to swing box.|Y
01|189189|4|3|Cable to be installed by DMG MORI|Y
01|189189|5|1|Commissioning of table: Lyndex-Nikken to travel to|Y
01|189189|5|2|Davis factory to set paremters provide required|Y
01|189189|5|3|assistance.|Y
01|189189|6|1|12 custom riser to locate table spindle on center line|Y
01|189189|6|2|of pallet travel.|Y
01|189192|3|1|Alternative for C4007-0020-6.00|Y
01|189192|22|1|Not available in sealed|Y
01|189192|25|1|Not available in sealed|Y
01|189201|3|1|Includes 4th&5th axis power and feedback cables from|Y
01|189201|3|2|the Nikken Table to Machine Bulkhead. 4th&5th axis|Y
01|189201|3|3|interface installation travel & Labor|Y
01|189204|2|1|NT103-23000  Nakamura Live ER25 Z-Axis 90Deg Internal|Y
01|189204|2|2|and External Coolant / Cannot be run dry. 3600-RPM|Y
01|189204|2|3|55mm Center Height|Y
01|189216|2|1|Table without motor L/N to install the existing motor|Y
01|189216|2|2|on to new table body.|Y
01|189223|1|1|This is a 5ax-130 tilt rotary table set up for Fanuc|Y
01|189223|1|2|with NO servo motors included.  This table will be set|Y
01|189223|1|3|up to accecpt fanuc servo motors but there source and|Y
01|189223|1|4|installation is up to the customer.  This table without|Y
01|189223|1|5|motors also does not include installation on a machine|Y
01|189223|1|6|Lyndex-Nikken could support an installation but it|Y
01|189223|1|7|will need to be quoted in addition to this line item.|Y
01|189223|1|8|Customer is responsible and liable for sourcing the|Y
01|189223|1|9|motors machine interface and any other needed items.|Y
01|189223|1|10|This is only a table with no motors or cables included.|Y
01|189223|4|1|This is a 5AX-130 tilt rotary table set up for and with|Y
01|189223|4|2|Fanuc motors.  This is the table and servo motors only.|Y
01|189223|4|3|No cables or installation components are included and|Y
01|189223|4|4|installation of table on a machine is also the customer|Y
01|189223|4|5|responsibility.  Lyndex-Nikken could support machine|Y
01|189223|4|6|install but is it Not included on this quote.  If|Y
01|189223|4|7|installation is needed it will need to be quoted in|Y
01|189223|4|8|addition to this table quote.|Y
01|189223|4|9|This is table and motors ONLY.|Y
01|189227|1|1|DESC:  HSK63A 0.75GL 10.584 End Mill Holder|Y
01|189227|1|2|Per customer provided drawing|Y
01|189227|6|1|DESC: HSK63A 0.75GL 11.254 End Mill Holder|Y
01|189227|6|2|Per customer's provided drawing|Y
01|189227|11|1|DESC. HSK63A Shell Mill Holder|Y
01|189227|11|2|Per customer's provided drawing|Y
01|189233|1|1|BT30 ER16 Angle head|Y
01|189233|1|2|No Coolant|Y
01|189233|2|1|BT30 ER16 Angle head|Y
01|189233|2|2|External coolant|Y
01|189233|3|1|BT30 ER25 Angle head|Y
01|189233|3|2|INT/EXT coolant; No Dry Run|Y
01|189233|4|1|BT30 ER25 Angle head|Y
01|189233|4|2|No Coolant|Y
01|189235|1|1|Please verify 65mm Center Height works for application|Y
01|189248|12|1|Special - cannot be cancelled or returned|Y
01|189248|12|2|NET PRICE|Y
01|189248|13|1|part# KM3/4-13/32|Y
01|189248|13|2|KM3/4 13/32 (.406) ID Collet|Y
01|189248|13|3|Special - cannot be cancelled or returned|Y
01|189248|13|4|NET PRICE|Y
01|189254|1|1|Req.INS/Install S1/4-28X1/4|Y
01|189254|2|1|1st Batch|Y
01|189254|3|1|1st Batch|Y
01|189254|4|1|1st Batch|Y
01|189254|5|1|1st Batch|Y
01|189254|6|1|1st Batch|Y
01|189254|7|1|1st Batch|Y
01|189254|8|1|1st Batch|Y
01|189254|9|1|1st Batch|Y
01|189254|10|1|1st Batch/#RDC5.C8.080|Y
01|189254|11|1|1st Batch|Y
01|189254|12|1|1st Batch|Y
01|189254|13|1|1st Batch|Y
01|189254|14|1|1st Batch|Y
01|189263|1|1|Please allow 10 to 12 weeks for delivery|Y
01|189264|1|1|Sigma 7 Motors|Y
01|189275|1|1|Due to arrive 12/5/22|Y
01|189285|2|1|Net each priceno additional discount|Y
01|189285|2|2|Special item is non cancelable nor returnable|Y
01|189285|3|1|KM42-1.4373 // Straight Collet/Sleeve OD 42mm ID 1.4373|Y
01|189285|3|2|Net ea priceno additional discount|Y
01|189285|3|3|Special item is not cancelable nor returnable|Y
01|189287|1|1|Ref model: TAT401N S#2337|Y
01|189287|2|1|6p rotary joint for water-glycol type|Y
01|189287|2|2|Ref model: TAT401N S#2337|Y
01|189304|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|189308|2|1|as of now 3pc will be avail Mid March|Y
01|189318|1|1|ETA: 12/16|Y
01|189336|2|1|RMS-5.5 +0.035/+0.030|Y
01|189336|2|2|Carbide PF Radical Mill Reamer 5.5mm  MOQ: 1-4pcs|Y
01|189341|1|1|CKFN12-4|Y
01|189343|4|1|$1000 shrink fit tool credit with purchase of Start2|Y
01|189343|4|2|at list pricing|Y
01|189347|2|1|C6 Shrink Fit 5/16|Y
01|189347|2|2|with coolant port|Y
01|189381|19|1|Rigid Tap Collets not Torque Control|Y
01|189381|21|1|Rigid Tap Collets not Torque Control|Y
01|189383|3|1|Part # NC5036-0750-8.00-M. Modification to add|Y
01|189383|3|2|2 coolant ports to holder|Y
01|189383|3|3|NET ea price;non cancelablenon returnable once ordered|Y
01|189387|1|1|Package price incluse 10 standard inch size SF holders|Y
01|189387|1|2|with less that 6 gage lenghths.|Y
01|189399|1|1|(BT30-SK20-60 is in stock)|Y
01|189399|3|1|BT30-SK13-60|Y
01|189399|3|2|(BT30-SK13-75 is in stock)|Y
01|189399|7|1|(BT30-SK10-90 and BT30-SK10-120 are in stock)|Y
01|189417|1|1|35pc ETA 01/13. 50pc ETA 02/24. 15pc ETA pending|Y
01|189422|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|189428|1|1|SPECIAL - Cannot be cancelled or returned|N
01|189436|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|189438|2|1|Installation includes: Dual axis drive unit short bar|Y
01|189438|2|2|fiber optic cables communications cable bulkhead|Y
01|189438|2|3|cable external cables paremter changes service time|Y
01|189438|2|4|and travel. Installation to take approx 2-days|Y
01|189444|1|1|SERVICE CALL QUOTE 5AX-201SA-BR2 S700X1|Y
01|189444|1|2|SN: 5603|Y
01|189454|1|1|Req. INS/T/P Inspection Required.ESD 11/E BOAT|Y
01|189465|1|1|Material Tolerance: +0/-.004|Y
01|189473|4|1|Please Note: This item is quoted at NET price.|Y
01|189478|1|1|Req. INS/920259 Groves Ind./Halliburton|Y
01|189480|1|1|Special Faceplate that matches Rotary Table S/N 9540|Y
01|189480|1|2|Includes 8+1p Built-In Rotary Joint|Y
01|189480|1|3|10% Core Trade-In Discount|Y
01|189484|1|1|Table Includes Servo Motor|Y
01|189484|2|1|Air/Hyd Booster For Rotary Table Brake|Y
01|189484|3|1|Swing Box Set CNC501T|Y
01|189484|4|1|Installation includes: Bulkhead cables external cables|Y
01|189484|4|2|parameter changes service time and travel.|Y
01|189496|1|1|Precision Ground|Y
01|189496|1|2|Maximum TIR 0.0002|Y
01|189510|8|1|Hi speed wrench for BT30-SK16-60P|Y
01|189510|9|1|Hi speed holder for BT30-SK6-60P|Y
01|189521|4|1|P/N: KM32-33/64|Y
01|189521|4|2|Straight Collet/Sleeve OD32mm ID 33/64 Large Chamfered|Y
01|189547|2|1|SAW BLADE LIVE; BMT53 BEVEL GEAR DRIVE for FUJI TN40R|Y
01|189547|2|2|EXTERNAL COOLANT [725PSI] d=22mm; Dmax=80mm;|Y
01|189547|2|3|2.66:1 GEAR; MAXin 6500 RPM; MAXout 2450 RPM; MAX 20Nm|Y
01|189547|2|4|WRENCH NOT INCLUDED;|Y
01|189549|1|1|LYN part# PS-5068|Y
01|189549|1|2|CAT50 (for dual contact) 60-Degree Pull Stud|Y
01|189549|1|3|Coolant Through with 2 o-rings|Y
01|189549|1|4|Machine: Okuma 80YB|Y
01|189565|1|1|I-Tine|N
01|189565|1|2|ISO15-ER11m-36|Y
01|189565|1|3|HIGH SPEED SLIM COLLET CHUCK|Y
01|189565|1|4|ER11|Y
01|189565|2|1|IS15-15DEG Retentoion Knob|Y
01|189565|3|1|IS15-AT WRENCH|Y
01|189565|4|1|ER11m-MST WRENCH|Y
01|189567|1|1|Includes cables.|Y
01|189575|1|1|Includes Haas Motor and Cables.|Y
01|189576|12|1|*Replaced old part# TQW-PS19|Y
01|189579|1|1|S.LCH32-SZF16SC-P|Y
01|189579|1|2|ZERO ZERO PRO SET WITH COOLANT SK-AC COLLETS|Y
01|189591|1|1|Please Note: This item is non standard stock. Once|Y
01|189591|1|2|a purchase order is placed it cannot be cancelled|Y
01|189591|1|3|or returned.|Y
01|189595|1|1|Please Note: This item is non standard stock. Once|Y
01|189595|1|2|a purchase order is placed it cannot be cancelled|Y
01|189595|1|3|or returned.|Y
01|189618|5|1|CAT40-ER32-6.00BN|Y
01|189618|5|2|CAT40 ER32 Collet Chuck w/ 6 Gage Length|Y
01|189618|5|3|**Bearing Nut Style**|Y
01|189623|1|1|Includes Haas Motors and Cables.|Y
01|189627|1|1|Includes (2)SF-POT-#40 Tool Holder Pots|Y
01|189627|6|1|Coil clips included as part of unit|Y
01|189633|1|1|This itme is non standard stock. Once a purchase order|Y
01|189633|1|2|is placed it cannot be cancelled or returned.|Y
01|189635|1|1|HSK63A-FMC32-60|Y
01|189645|1|1|Req.INS/T/P Inspection Required12/12A|Y
01|189645|2|1|Req.INS/T/P Inspection Required|Y
01|189646|1|1|1st Batch/For stockMFG7/15>10/7#6UPD10/3>>ESD 11/30 AI|Y
01|189662|3|1|Please Note: Quoted at NET price.|Y
01|189665|1|1|NET ea price with no additional discount|Y
01|189665|1|2|Special itemnot cancelable nor returnable once ordered|Y
01|189665|1|3|Replaces part #CAT40U-UMT 200|Y
01|189666|6|1|TAT-170 Support End Riser for CNC260 table.|Y
01|189695|1|1|Shrink Fit Package: START2 w/200-240V Power Supply|Y
01|189695|1|2|Must ship with 2ea SF-POT-HSK63 1ea SF-RACK-POT|Y
01|189695|1|3|1ea SF-RACK-HEAT-RING 2ea SF-POT-#40|Y
01|189695|1|4|2ea SF-POT-HSK100 SF-START2-COOL-FAN40|Y
01|189695|1|5|30 SHRINK FIT HOLDERS|Y
01|189703|10|1|FREE TOOLING CERTIFICATE WITH IMTS PRESETTER PROMO|Y
01|189733|3|1|SK25-14A|Y
01|189733|6|1|SK25-24A|Y
01|189755|7|1|INCLUDES 8 HOURS TO INSTALL AND TRAIN|Y
01|189776|1|1|KM1.1/2-32 Straight Collet/Sleeve OD 1.1/2 ID 32mm|Y
01|189776|1|2|Please Note: This collet is special once a purchase|Y
01|189776|1|3|order is placed it cannot be cancelled or returned.|Y
01|189776|1|4|QUOTED AT NET PRICE|Y
01|189785|1|1|Special 5C collet 1.055 ID|Y
01|189785|1|2|Please Note: There are no price breaks and minimum|Y
01|189785|1|3|quanitiy order is 5 pieces.|Y
01|189788|4|1|ADDITIONAL 5% DISCOUNT FROM COMING TO OUR IMTS BOOTH|Y
01|189788|4|2|35 > 40% FOR PROMO DISCOUNT|Y
01|189790|4|1|10% ADDITIONAL DISCOUNT FROM IMTS BOOTH PROMOTION|Y
01|189790|4|2|46% > 56% DISCOUNT|Y
01|189793|1|1|SPECIAL CNC401LFA-90 with 9+1P Rotary Union for HORKOS|Y
01|189793|2|1|SPECIAL CNC401LFA-120 with 9+1P Rotary Union for HORKOS|Y
01|189805|1|1|RGA#LVR-59010/|Y
01|189805|1|2|Repair of BMT65-ER32X-ICE s/n:76618-08|Y
01|189805|1|3|(Mimatic#186490)|Y
01|189805|2|1|Bearings seals o-rings and damaged spindle to be|Y
01|189805|2|2|replaced.|Y
01|189808|1|1|RGA#CUR-58918/|Y
01|189808|1|2|Repair of C40RA-0025M s/n:49928 01 (Mimatic#175241)|Y
01|189808|2|1|Bearings seals and o-rings to be replaced.|Y
01|189809|1|1|Replaces part# VMK8-1/8J|Y
01|189810|1|1|RGA#LVR-58409/|Y
01|189810|1|2|Repair of MZMP46-ER32Z-C s/n:29208 02 (Mimatic#124854)|Y
01|189810|2|1|Bearings seals and o-rings to be replaced.|Y
01|189810|4|1|RGA#LVR-58409/|Y
01|189810|4|2|Repair of MZMP46-ER32Z-C s/n:74676 07 (Mimatic#124854)|Y
01|189810|5|1|Bearings seals and o-rings to be replaced.|Y
01|189810|7|1|RGA#LVR-58409/|Y
01|189810|7|2|Repair of MZMP46-ER32Z-C s/n:41340 02 (Mimatic#124854)|Y
01|189810|8|1|Bearings seals and o-rings to be replaced.|Y
01|189810|10|1|RGA#LVR-58409/|Y
01|189810|10|2|Repair of MZMP46-ER32Z-C s/n:48073 06 (Mimatic#124854)|Y
01|189810|11|1|Bearings seals and o-rings to be replaced.|Y
01|189810|13|1|RGA#LVR-58409/|Y
01|189810|13|2|Repair of MZMP46-ER32X-OFF-C s/n:68272 20|Y
01|189810|13|3|(Mimatic#124252)|Y
01|189810|14|1|Bearings seals and o-rings to be replaced.|Y
01|189819|1|1|RGA#LVR-58997/|Y
01|189819|1|2|Repair of MNL12-SK20Z-ICE-10K s/n:88780 02|Y
01|189819|1|3|(Mimatic#184650)|Y
01|189819|2|1|Bearings seals and o-rings to be replaced.|Y
01|189819|4|1|RGA#LVR-58997/|Y
01|189819|4|2|Repair of MNL12-SK20Z-ICE-10K s/n:92006 03|Y
01|189819|4|3|(Mimatic#184650)|Y
01|189819|5|1|Bearings seals o-rings and damaged input spindle to|Y
01|189819|5|2|be replaced.|Y
01|189826|1|1|PLEASE NOTE:WRENCH-MIM-107447 is a non stock item. Once|Y
01|189826|1|2|an order is placed it cannot be cancelled or returned.|Y
01|189826|1|3|DELIVERY: ETA 12/29 if order is placed before 12/12|Y
01|189834|3|1|SK25-14A|Y
01|189834|6|1|SK25-24A|Y
01|189837|4|1|Once ordered this item cannnot be returned.|Y
01|189840|11|1|INCUDES 8 HOURS TO INSTALL AND TRAIN.|Y
01|189854|2|1|2 POTS ARE INCLUDED WITH SF UNIT AT NO COST|Y
01|189863|1|1|This item is discontinued and non returnable|Y
01|189863|3|1|This item is discontinued and non returnable|Y
01|189869|1|1|*Modified DIN Form B|Y
01|189869|1|2|*Net price|Y
01|189870|2|1|Adapter Plate for TAT-250|Y
01|189878|3|1|TAR-58961|Y
01|189878|3|2|CNCZ202FA SN: 12079T|Y
01|189880|1|1|REPLACEMENT TABLE FOR CNCZ202FA SN: 12079T|Y
01|189880|1|2|*** SPECIAL 1 TIME PRICE CORE TRADE IN ***|Y
01|189880|1|3|REF TAR-58961|Y
01|189880|2|1|REPLACEMENT TABLE FOR CNCZ202LFA SN: 20014T|Y
01|189880|2|2|*** SPECIAL 1 TIME PRICE CORE TRADE IN ***|Y
01|189880|2|3|REF TAR-58923|Y
01|189887|5|1|Replaces NT15-SET-07|Y
01|189892|1|1|Special showroom table pricing.|Y
01|189892|1|2|Table has been displayed only.|Y
01|189894|1|1|Discount reflects PO of 10 milling Chucks.|Y
01|189894|3|1|Discount reflects PO of 20 milling chucks.|Y
01|189894|5|1|Discount reflects PO of 30 milling chucks.|Y
01|189894|7|1|Discount reflects PO of 40 milling chucks.|Y
01|189910|1|1|PO will not be accepted without machine & ladder info|Y
01|189910|3|1|PO will not be accepted without machine & ladder info|Y
01|189911|1|1|VMK12-9.0297mm collet (to fit a O.3555-.0005 pin).|Y
01|189937|2|1|Includes: Dual axis drive short bar fiber optic cable|Y
01|189937|2|2|communications cable bulkhead cables external cables|Y
01|189937|2|3|parameter changes service time and travel.|Y
01|189947|17|1|Wrench for BT30-C3/4-75|Y
01|189947|18|1|Wrench for BT30-SK10-45|Y
01|189948|7|1|Shank Dia: 4mm-     Hole Dia: 2.5mm|Y
01|189948|8|1|Shank Dia: 6mm-     Hole Dia: 4mm|Y
01|189948|9|1|Shank Dia: 10mm-     Hole Dia: 8mm|Y
01|189965|1|1|This item is not returnable.|Y
01|189975|1|1|4 pcs in Japan|Y
01|189978|1|1|Shrink Fit Package: FI6 w/380-480V Power Supply|Y
01|189978|1|2|Must ship with 2ea SF-POT-HSK63 2ea SF-POT-HSK100|Y
01|189978|1|3|2ea SF-POT-#40 and 40 Shrink Fit Holders.|Y
01|189978|1|4|Must ship with 2 x (SF-POT-xx)|Y
01|189978|1|5|1ea x SF-RACK-POT SF-RACK-HEAT-RING|Y
01|189978|4|1|Due 4/17|Y
01|189978|6|1|Due 4/17|Y
01|189978|9|1|Due 4/17|Y
01|189993|1|1|OKLB35-ER32X|Y
01|189993|1|2|Okuma Live ER32 X-Axis 90Deg<Side>VDI ExtCoolant VDI50|Y
01|189993|1|3|VDI50 DIN ISO10889 S1=105 L=100mm;|Y
01|189993|1|4|1:1 GEAR MAX 100Nm; 6000 RPM|Y
01|189993|1|5|REF DRWG # 58114|Y
01|189993|2|1|OKLB35-ER32Z|Y
01|189993|2|2|Okuma Live ER32 Z-Axis STRT<Face>VDI ExtCoolant VDI50|Y
01|189993|2|3|VDI50 DIN ISO10889 S1=105 L~134mm|Y
01|189993|2|4|1:1 GEAR MAX 100Nm; 6000 RPM REF DRWG # 58109|Y
01|189993|4|1|OKLB35-ER40X|Y
01|189993|4|2|Okuma Live ER40 X-Axis 90Deg<Side>VDI ExtCoolant VDI50|Y
01|189993|4|3|VDI50 DIN ISO10889 S1=105 L=100mm;|Y
01|189993|4|4|1:1 GEAR MAX 100Nm; 6000 RPM:  REF DRWG # 58114|Y
01|189993|5|1|OKLB35-ER40Z|Y
01|189993|5|2|Okuma Live ER40 Z-Axis STRT<Face>VDI ExtCoolant VDI50|Y
01|189993|5|3|VDI50 DIN ISO10889 S1=105  L~134mm;|Y
01|189993|5|4|1:1 GEAR MAX 100Nm; 6000 RPM: REF DRWG # 58109|Y
01|190008|1|1|TAR-59024|Y
01|190008|1|2|5AX-130FA-M SN: 4462|Y
01|190011|9|1|INCLUDES 8 HOURS FOR INSTALLATION & TRAINING|Y
01|190012|9|1|INCLUDES 8 HOURS FOR INSTALLATION & TRAINING|Y
01|190016|1|1|Please Note: Above angle head is non standard stock.|Y
01|190016|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|190016|1|3|or returned.|Y
01|190016|5|1|Please Note: Above angle heads ar Special once a|Y
01|190016|5|2|purchase order is placed it cannot be cancelled or|Y
01|190016|5|3|returned.|Y
01|190018|1|1|HH9C100 N-1514-00|Y
01|190018|1|2|HOWA Rotary Cylinder for FUJI CSD300II|Y
01|190018|1|3|(Dual spindle type) Delivery: MFG 180day(6mo)+Ship 2WK|Y
01|190020|1|1|Lyndex part# CAT50-SF0375-5.00CP CAT50 3/8 Shrink 5 GL|Y
01|190020|1|2|Old Command part # C6Y4-0375|Y
01|190020|1|3|12 PC - $366 Net Ea.|Y
01|190020|1|4|20 PC - $366 Net Ea. *Same price than 12pcs|Y
01|190023|1|1|1st Batch/For stock 6/23/21:DWG Approved/BTMFG1/7>11/1|Y
01|190023|2|1|1st Batch/For stock 6/23/21:DWG Approved/BTMFG'21>11/1|Y
01|190023|3|1|1st Batch/For stock 6/23/21:DWG Approved/BT(23)ESD 12/|Y
01|190030|58|1|replacement part# for C4017-0008-4.00|Y
01|190040|1|1|RGA#LVR-59063/|Y
01|190040|1|2|Repair of MZMP47-ER32X-OFF s/n:73900 09|Y
01|190040|1|3|(Mimatic#124021)|Y
01|190040|2|1|Bearings seals and o-rings to be replaced.|Y
01|190046|2|1|Okuma Cable Sets|Y
01|190048|1|1|HSK63F Taper Blank Bar Dia 63mm length 200mm|Y
01|190048|2|1|HSK63F Taper Blank Bar Dia 90mm length 160mm|Y
01|190052|17|1|This item is special once an order is placed it cannot|Y
01|190052|17|2|be cancelled or returned.|Y
01|190052|18|1|This item is special once an order is placed it cannot|Y
01|190052|18|2|be cancelled or returned.|Y
01|190054|1|1|NET ea priceno additional discount|Y
01|190054|1|2|Special item non-cancelablenon returnable|Y
01|190058|1|1|Table will be configured to match the set up of the|Y
01|190058|1|2|existing table that is in for repair.|Y
01|190058|3|1|Replacement Cables - 2 Pairs of Power/Signal & Feedback|Y
01|190058|3|2|cables.  Complete set of external cables for connecting|Y
01|190058|3|3|the table to the machine tool.|Y
01|190063|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|190070|1|1|Special item is not cancelable nor returnable|Y
01|190072|26|1|Includes 0 - 9/16 hand and 1/8 pipe|Y
01|190072|28|1|Includes 5/16 - 1 hand and 1/4 - 1/2 pipe|Y
01|190072|30|1|Includes 13/16 - 1-3/8 hand and 1/2 - 1 pipe|Y
01|190091|1|1|Replaces discontinued part #C4001-1000-1.75|Y
01|190104|1|1|Special item need to order from factory|Y
01|190105|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|190105|3|1|MACHINE ALREADY HAS (1) AMP AND WIRING INSTALLED|Y
01|190105|3|2|WE REDUCED INSTALL COST BY $3000 BECAUSE WE ONLY|Y
01|190105|3|3|HAVE TO INSTALL (1) MORE AMP AND WIRING FOR THAT AMP|Y
01|190106|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|190106|3|1|MACHINE ALREADY HAS (1) AMP AND WIRING INSTALLED|Y
01|190106|3|2|WE REDUCED INSTALL COST BY $3000 BECAUSE WE ONLY|Y
01|190106|3|3|HAVE TO INSTALL (1) MORE AMP AND WIRING FOR THAT AMP|Y
01|190111|2|1|2ND DRIVE WIRING AND CONNECTORS WILL BE ADDED|Y
01|190111|2|2|PRICE REDUCED SINCE 1 DRIVE AND WIRING IN PLACE|Y
01|190126|12|1|ADDITIONAL 10% OFF FOR VISITING OUR BOOTH AT IMTS|Y
01|190134|2|1|3-4 days|Y
01|190134|4|1|3-4 days|Y
01|190147|1|1|2-3 weeks ARO|Y
01|190150|2|1|** PART # TCE-46068 **|Y
01|190155|1|1|1st Batch/924609 GeneralAtomics|Y
01|190155|1|2|**Please Inspect ASAP!!|Y
01|190155|2|1|Req.INS:Need to check dual contact tolerance.|Y
01|190155|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|190155|3|2|1st Batch|Y
01|190157|1|1|Range: 1.313-1.375|Y
01|190162|23|1|10% ADDITIONAL DISCOUNT FOR STOPPING BY IMTS BOOTH|Y
01|190167|1|1|RGA#LVR-59069/|Y
01|190167|1|2|Repair of OKU-L370MW-MN s/n:AL099|Y
01|190167|2|1|Bearings o-rings collet nut and spindle to be|Y
01|190167|2|2|replaced. If the spindle can be reused the cost will|Y
01|190167|2|3|be $2522.80|Y
01|190167|4|1|RGA#LVR-59069/|Y
01|190167|4|2|Repair of OKL3-ER32Z-OFMS s/n:AL0202 (Alps#OK109-15001)|Y
01|190167|5|1|Bearings o-rings collet nut and spindle to be|Y
01|190167|5|2|replaced. If the spindle can be reused the cost will|Y
01|190167|5|3|be $3180.40|Y
01|190167|7|1|RGA#LVR-59069/|Y
01|190167|7|2|Repair of OKL3-ER32X s/n:AL1218 (Alps#OK101-14000)|Y
01|190167|8|1|Bearings o-rings collet nut and spindle to be|Y
01|190167|8|2|replaced. If the spindle can be reused the cost will|Y
01|190167|8|3|be $1250.00|Y
01|190167|10|1|RGA#LVR-59069/|Y
01|190167|10|2|Repair of OKL3-ER32X s/n:AL1268 (Alps#OK101-14000)|Y
01|190167|11|1|Bearings o-rings collet nut and spindle to be|Y
01|190167|11|2|replaced. If the spindle can be reused the cost will|Y
01|190167|11|3|be $1250.00|Y
01|190177|1|1|Part # PMK12-9.1|Y
01|190177|1|2|Alternative for part # VMK12-9.0297mm no thru coolant|Y
01|190177|2|1|Part # PMK12-9.2|Y
01|190177|2|2|Alternative for part # VMK12-9.0297mm no thru coolant|Y
01|190196|1|1|TW30 Tool Wagon BT30|Y
01|190196|2|1|TW40 Tool Wagon BT40|Y
01|190200|1|1|TAR-59047 5AX-201YA-M SN: 6555|Y
01|190200|1|2|CUSTOMER ASKING FOR EVALUATION|Y
01|190200|1|3|Technician checked rotary and tilting axis.|Y
01|190200|1|4|Rotary axis in good condition no need to repair|Y
01|190200|1|5|tilting Axis was locked after disassembly table had|Y
01|190200|1|6|contact/crash with tool or machine causing damange|Y
01|190200|1|7|internally.  Need to rebuild tilting axis parts + labor|Y
01|190211|3|1|Wrench for SK10 holder|Y
01|190211|4|1|wrench for SK6 holder|Y
01|190219|1|1|DC24V OFF CLAMP AIR BRAKE|Y
01|190219|3|1|Rotary Joint Ports are rotated per Benteler spec|Y
01|190219|3|2|Reference previous orders for RJ orientation|Y
01|190219|4|1|DOOSAN DNM6700L|Y
01|190224|1|1|TAR-59065|Y
01|190224|1|2|CNCZ180LSA-BR SN: 10737|Y
01|190230|1|1|Please Note: This item is non standard stock. Once a|Y
01|190230|1|2|purchase order is placed it cannot be cancelled or|Y
01|190230|1|3|returned.|Y
01|190235|3|1|Please note: This is quoted at NET price.|Y
01|190236|1|1|BT30-MMC8C-135-AA|Y
01|190236|1|2|Stock in Japan. Non-cancellable Non-returnable|Y
01|190246|1|1|Special item is non-cancelable non-returnable|Y
01|190250|1|1|Quoted at NET pricing.|Y
01|190250|1|2|1pc in stock balance is 14 weeks ARO with approved|Y
01|190250|1|3|drawing|Y
01|190252|13|1|SKJ6-1/4 SK6 Coolant Cap 1/4 Jet Slots|Y
01|190257|1|1|**USED/W2 - Sold As-Is**|Y
01|190257|1|2|once a PO has been issued this cannot be cancelled or|Y
01|190257|1|3|returned|Y
01|190262|2|1|**NET CHARGE to SST|Y
01|190264|1|1|Please allow 4 to 6 weeks delivery ARO|Y
01|190264|2|1|Please allow 5 to 6 monthe delivery ARO|Y
01|190265|1|1|1st Batch/923375 Paragon/Unverferth 9/7:DWG Appr'd/Cust|Y
01|190284|3|1|1 in stock additional pieces ETA is Mid May 2023|Y
01|190290|1|1|Alternate to discontinued part S62SF-0250-4.00-3|Y
01|190290|1|2|(drawing sent with the quote)|Y
01|190297|5|1|Delivery will be about 1week after design is complete|Y
01|190297|5|2|NET ea cost no additional discount|Y
01|190297|5|3|The items above are considered non-returable|Y
01|190301|18|1|IMTS BOOTH VISIT PROMOTION EXTRA 10% OFF - 35>45%|Y
01|190309|1|1|Part # VMK12-9.03|Y
01|190309|1|2|This range is slightly wider than the customer's pin|Y
01|190309|1|3|(0.3555 -.0005 = 9.017~9.0297mm)|Y
01|190313|2|1|Installation includes: Bulkhead cables external cables|Y
01|190313|2|2|parameter changes service time and travel.|Y
01|190315|6|1|Part#AS568-014. O-ring for SKJ25-1/2C|Y
01|190316|5|1|Please Note: This is quoted at NET price.|Y
01|190327|1|1|Special item not cancelable nor returnable|Y
01|190327|1|2|Net ea price|Y
01|190347|1|1|BMT65 LIVE ; ER32 STRAIGHT OFFSET; V=50mm;|Y
01|190347|1|2|EXTERNAL COOLANT;|Y
01|190347|1|3|2:1 GEAR; MAX TORQUE 80Nm;|Y
01|190347|1|4|MAX INPUT 8500 RPM; MAX OUTPUT 4250 RPM;|Y
01|190347|1|5|REF DRWG # 55021|Y
01|190347|1|6|Drawing approval needed|Y
01|190347|5|1|BMT65 LIVE ; ER32 STRAIGHT OFFSET; V=50mm;|Y
01|190347|5|2|INTERNAL COOLANT;|Y
01|190347|5|3|2:1 GEAR; MAX TORQUE 80Nm;|Y
01|190347|5|4|MAX INPUT 8500 RPM; MAX OUTPUT 4250 RPM;|Y
01|190347|5|5|REF DRWG # 55021|Y
01|190347|5|6|Drawing Approval Needed|Y
01|190356|1|1|This item is considered special once ordered it cannot|Y
01|190356|1|2|be cancelled or returned.|Y
01|190357|1|1|1st Batch/DWG saved in Eng. File|Y
01|190357|2|1|Req.INS/Install S7/16-20X3/8|Y
01|190357|3|1|Req.INS/Install S9/16-18X1/2|Y
01|190357|4|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|190357|5|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|190357|6|1|1st Batch/(1)932581|Y
01|190357|7|1|1st Batch/Stock 9/28:DWG Approved/BT saved in Teams|Y
01|190357|8|1|1st Batch DWG @ Engineering|Y
01|190357|9|1|Req. INS/921857 Wm F. Hurst/GKN-KS 7/26:DWG Re-Approved|Y
01|190357|10|1|Req. INS/Install E11-NUT & ER11-SCRWE(C)|Y
01|190357|11|1|1st Batch/DWG Saved in Eng. File.|Y
01|190357|12|1|1st Batch/DWG Saved in Eng. File.|Y
01|190357|13|1|1st Batch/DWG Saved in Eng. File.|Y
01|190357|14|1|1st Batch/DWG Saved in Eng. File.|Y
01|190357|15|1|1st Batch/DWG Saved in Eng. File.|Y
01|190358|1|1|1st Batch|Y
01|190358|2|1|1st Batch(w/ScrewOnKey)|Y
01|190358|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|190358|4|1|Req.INS:Need to check dual contact tolerance.|Y
01|190358|5|1|Req.INS:Need to check dual contact tolerance.|Y
01|190358|6|1|Req.INS:Need to check dual contact tolerance.|Y
01|190358|7|1|Req.INS:Need to check dual contact tolerance.|Y
01|190358|8|1|Req.INS until tolerance issue gets resolved|Y
01|190358|9|1|Req.INS until tolerance issue gets resolved|Y
01|190358|10|1|Req.INS until tolerance issue gets resolved|Y
01|190358|11|1|Req.INS until tolerance issue gets resolved|Y
01|190358|12|1|Req.INS until tolerance issue gets resolved|Y
01|190360|1|1|Bombardier Part # GC000649|Y
01|190360|2|1|Bombardier Part # GC000648|Y
01|190360|3|1|Modification Charge for etching Bombardier part|Y
01|190360|3|2|numbers on collets. Quoted at Net price.|Y
01|190372|1|1|1st Batch/DWG SAVED IN TEAMS FILE|Y
01|190372|2|1|1st Batch/For stock *DWG Saved in Teams File.|Y
01|190372|3|1|1st Batch/(1)935451/S&S 12/13:DWG Saved in Teams File|Y
01|190388|5|1|Installation includes: Dual axis drive unit short bar|Y
01|190388|5|2|fiber optic cables communications cables bulkhead|Y
01|190388|5|3|cables external cables parmeter changes service time|Y
01|190388|5|4|and travel.|Y
01|190397|21|1|1ea stocknext shipment due 1/18 week|Y
01|190402|2|1|Installation includes: Drive unit short bar fiber|Y
01|190402|2|2|optic cablecommunications cable bulkhead cables|Y
01|190402|2|3|external cables parameter changes service time and|Y
01|190402|2|4|travel.|Y
01|190403|25|1|Good stock avail.Choose qty based on holders ordered|Y
01|190403|27|1|Torgue handle for ER16/ER32/SK10/SK16|Y
01|190403|32|1|Torgue handle for SK6|Y
01|190403|34|1|Wrench for 1.1/4 mill chuck|Y
01|190404|5|1|Installation includes: Drive unit short bar fiber|Y
01|190404|5|2|optic cable communications cable bulkhead cable|Y
01|190404|5|3|external cable paramter changes service time and|Y
01|190404|5|4|travel.|Y
01|190406|1|1|No INS needed/Cheersun BOAT #12072201-B|Y
01|190406|2|1|No INS needed/Cheersun BOAT #12072201-B|Y
01|190406|3|1|No INS needed/Cheersun BOAT #12072201-B|Y
01|190406|4|1|No INS needed/Cheersun BOAT #12072201-B|Y
01|190406|5|1|No INS needed/Cheersun BOAT #12072201-B|Y
01|190406|6|1|No INS needed/Cheersun BOAT #12072201-B|Y
01|190406|7|1|No INS needed/Cheersun BOAT #12072201-B|Y
01|190408|1|1|TAR-59083|Y
01|190408|1|2|CNC401TFA SN: 8074|Y
01|190409|1|1|Demo stock.Submit PO to Lauriec@lyndexnikken.com|Y
01|190409|2|1|Replacement to missing item|Y
01|190409|3|1|Replacement to missing item|Y
01|190412|1|1|NCAT50-RAC32-288EU-C|Y
01|190412|1|2|New DWG#RAA02-48009/1: Base(NCAT50-Q16-233-M125)|Y
01|190412|1|3|+ Head(16-RAC32-55E-C)|Y
01|190412|2|1|NCAT50-ZMAC32-288AAVU-I|Y
01|190412|2|2|Base(NCAT50-Q16-233-M110A) + Head(16-ZMAC32-55AAV-I)|Y
01|190412|3|1|NCAT50-RAC43-293KU-C|Y
01|190412|3|2|Base(NCAT50-Q16-233-M110A) + Head(20-RAC43-70K-C)|Y
01|190412|4|1|NCAT50-ZMAC42-293AAVU-I|Y
01|190412|4|2|Base(NCAT50-Q20-233-M40.5A) + Head(20-ZMAC42-70AAV-I)|Y
01|190427|1|1|Nakanishi 1/8 collet CHS-3.175|Y
01|190427|1|2|Quoted at NET pricing|Y
01|190440|7|1|NCAT40 SK16 KIT|Y
01|190441|1|1|*******PLEASE NOTE********|Y
01|190441|1|2|IMTS PRICING EXPIRES ON 12/29/22|Y
01|190441|38|1|hsk.a.63.100.er11m|Y
01|190442|1|1|Comes with wrenches collets sold separately.|Y
01|190442|2|1|Comes with wrenches collets sold separately.|Y
01|190442|4|1|Positioning block to be made by Lyndex Nikken with|Y
01|190442|4|2|customer supplied spindle drawing of machine. MUST HAVE|Y
01|190442|4|3|Spindle Drawing in order to make block.  Customer can|Y
01|190442|4|4|choose to make themselves also.|Y
01|190444|2|1|Included with 5AX-350OSP4-M table.|N
01|190444|3|1|Included with 5AX-350OSP4-M table.|N
01|190444|4|1|Included with 5AX-350OSP4-M table.|N
01|190444|5|1|Included with 5AX-350OSP4-M table.|N
01|190444|13|1|Braided Stainless Steel Cable Set.|Y
01|190449|1|1|Same at Techniks Part# 22359|Y
01|190449|2|1|Same at Techniks Part# 22358|Y
01|190449|3|1|Same at Techniks Part# 04216 1/8|Y
01|190449|4|1|Same at Techniks Part# 04216 3/16|Y
01|190449|5|1|Same at Techniks Part# 04216 1/4|Y
01|190449|6|1|Same at Techniks Part# 04216 5/16|Y
01|190449|7|1|Same at Techniks Part# 04216 3/8|Y
01|190449|8|1|Same at Techniks Part# 04216 6mm|Y
01|190461|1|1|1st Batch|N
01|190461|2|1|1st Batch|Y
01|190461|3|1|1st Batch|Y
01|190461|4|1|1st Batch|Y
01|190477|1|1|Req.INS/Install S3/8-24X5/16|Y
01|190477|2|1|Req.INS/Install S7/16-20X3/8|Y
01|190477|3|1|Req.INS/Install S9/16-18X1/2|Y
01|190477|4|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|190477|5|1|Req.INS/Install S3/8-24X5/16|Y
01|190477|6|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|190477|7|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|190477|8|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|190480|23|1|10% ADDITIONAL DISCOUNT FOR STOPPING BY IMTS BOOTH|Y
01|190501|1|1|CAT40-ER32-6.00BN|Y
01|190516|5|1|This fee is being waived by Chris Blaine and Chris|Y
01|190516|5|2|will provide any needed support on site.|Y
01|190517|5|1|This fee is being waived by Chris Blaine.  Chris will|Y
01|190517|5|2|provide any support needed on site.|Y
01|190531|1|1|VDI 40 similar DIN 69880 (DIN ISO 10889) drive per DIN|Y
01|190531|1|2|1809 Duplomatic tooling interface for collet system|Y
01|190531|1|3|STRAIGHT VERSION ER32 (1.0-22mm according to DIN6499|Y
01|190531|1|4|internal coolant supply through spindle center and ext|Y
01|190531|1|5|over coolant pipes/nozzles.Output is NOT reversal to|Y
01|190531|1|6|input!Gear ratio=1:1 Max coolant pressurep(max)=70 bar|Y
01|190531|1|7|(1051 psi)Max torque rate M(max)=80Nm max spindle|Y
01|190531|1|8|revolution n(max)=6500rpm.#124222 ref dwg 00017851|Y
01|190531|1|9|Wrenches are not included (112900 and 107642)|Y
01|190531|1|10|Drawing approval is required once design is complete|Y
01|190531|4|1|ShankVDI40 similar to DIN 69880(DIN ISO 10889) Drive|Y
01|190531|4|2|Duplomatic DIN1809/90DEG Head.L1=75mm tooling interface|Y
01|190531|4|3|for collet system ER32(1.0-22mm)according DIN6499|Y
01|190531|4|4|internal coolant thru spindle center & over coolant|Y
01|190531|4|5|nozzles outut is revsal to input.Gear ratio 1:1|Y
01|190531|4|6|max coolant pressure=70bar(1015psi)max torque rate=80Nm|Y
01|190531|4|7|max spindle rev=6000RPM.Weight appx 9.2kg.Wrenches not|Y
01|190531|4|8|included.#101014 Ref drwg#00008568|Y
01|190531|4|9|Both items above are not cancelablenor returnable|Y
01|190531|4|10|special items.Drawing approval required.NET ea price|Y
01|190533|3|1|Adapter Plate to 5th Axis platform.|Y
01|190539|1|1|Please Note quoted at NET price.|Y
01|190554|1|1|RGA#LVR-59123/|Y
01|190554|1|2|Repair of OKU-L470-Z s/n:AL0024 (Alps#OK102-17000)|Y
01|190554|2|1|Bearings o-rings collet nut and spindle to be|Y
01|190554|2|2|replaced. If the spindle can be reused the cost will|Y
01|190554|2|3|be $981.82|Y
01|190563|1|1|AGH;DUAL CONTACT CAT50 CAPTO5 Drive shaft big plus|Y
01|190563|1|2|CAT50 special machine connection with 3 PIN support|Y
01|190563|1|3|Machine: C/N M2X8008 / - Serialno:2x8.169437|Y
01|190563|1|4|tooling interface for Capto C5|Y
01|190563|1|5|coolant supply through the spindle; L= 258mm|Y
01|190563|1|6|Gear Ratio: 2.5:1; Max Torque i(n1/n2)M(max)|Y
01|190563|1|7|250Nm output|Y
01|190563|1|8|nl(max)=4500 r.p.m.|Y
01|190563|1|9|n2(max)=1800 r.p.m.|Y
01|190563|1|10|weight approx 40kg|Y
01|190574|1|1|CAT50-FMD38.1-45U|Y
01|190585|3|1|WE DO NOT HAVE THE 4 GL IN 1.25 PILOT|Y
01|190601|1|1|1st Batch/For stock 4/17/20:DWG ApprovedMFG2021>11/11|Y
01|190601|2|1|Req.INS/Equipped w/BS-EM-3/4-16-UNF-L5/8MFG1/7>1/1|Y
01|190602|2|1|1st Batch/For stock 6/23/21:DWG Approved/BTMFG1/7>11/1|Y
01|190613|1|1|1st Batch/927984 MSC/Fike|Y
01|190614|1|1|Includes T-Slotted face palte and cable set.|Y
01|190616|2|1|Hydraulic to control table and tailstock brake|Y
01|190616|2|2|Nikken table requires 500psi|Y
01|190621|2|1|NBT40-SK20C-75|Y
01|190621|2|2|NBT40 Dual Contact SK20 Slim Chuck Coolant 15000rpm|Y
01|190621|7|1|NBT40-MDSK20-75|Y
01|190621|7|2|NBT40 Dual Contact SK20 Major Dream 15000rpm|Y
01|190625|1|1|5AXZ-DD350F SN: 1009|Y
01|190625|1|2|OKK MACHINE VC-X350 SN: 266|Y
01|190625|1|3|CUSTOMER HAD CRASH/OVERLOAD ON TILTING AXIS|Y
01|190625|1|4|SERVICE CALL FOR X2 LYNDEX-NIKKEN TECHS TO REPAIR TABLE|Y
01|190625|2|1|X2 TECHS FOR 1 WEEK REPAIR INCLUDES TRAVEL TIME|Y
01|190625|2|2|AND LABOR TIME FOR REPAIR|Y
01|190625|3|1|EXPENSES FOR X2 TECHS - ESTIMATE|Y
01|190640|1|1|With Original Flange assembly ordered special same as|Y
01|190640|1|2|the first time this was ordered by customer|Y
01|190640|2|1|With Original flange assembly|Y
01|190640|4|1|Without Flange Assembly|Y
01|190640|5|1|Without Flange Assembly|Y
01|190640|7|1|With Standard flange assembly with positioning pin|Y
01|190640|8|1|With Standard flange assembly with positioning pin|Y
01|190640|9|1|With Standard flange assembly with positioning pin|Y
01|190672|1|1|SPECIAL CNC302FA-HS with 9+1 Rotary Union for HORKOS.|Y
01|190676|1|1|Replacement SN#8074|Y
01|190676|1|2|Speical RT (No Motor)W/8+1 RJ built in|Y
01|190676|1|3|Showing Net Price|Y
01|190689|1|1|ref. Drawing# A197597|Y
01|190689|1|2|BMT45 Capto3 Straight Live Tool|Y
01|190689|1|3|Gear Ratio 1:1|Y
01|190689|1|4|*Net price|Y
01|190692|1|1|Please Note: Minimum order quanitity 2-pcs.|Y
01|190695|1|1|$6000 List Price Tooling Certificate|Y
01|190705|1|1|Main Arbor - Part# CAT50U-AF1-30-OH|Y
01|190705|1|2|Material is Cast Iron - Hole diameter is .74 +/- .008|Y
01|190705|1|3|D - Facing diameter is 1.417 +/- .02|Y
01|190705|1|4|t - Facing depth is to cleanup approx .050|Y
01|190705|1|5|T - Thickness is .88|Y
01|190705|1|6|h - Space is wide open as it's a flange|Y
01|190705|2|1|Arbor for above Part # BF130-18.8-36-22.4C|Y
01|190705|3|1|Byte for above Part # 9BF130-18.8-36-22.4C-W|Y
01|190705|3|2|MOQ = 5|Y
01|190710|2|1|** Closeout Promotion! All sales are FINAL!**|Y
01|190710|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|190710|4|1|Factory stock. can have here in 3-4 Weeks|Y
01|190716|2|1|This item is considered special and cannnot be returned|Y
01|190719|1|1|This will be converted to a CNCZ105-MA|Y
01|190719|1|2|Motors and cables will need to be purchased from Mazak|Y
01|190719|1|3|Please allow 1 week delivery ARO|Y
01|190720|1|1|NBT50-FMH25.4-70-90|Y
01|190720|2|1|NBT50-SK16C-135P|Y
01|190720|7|1|NBT50-C16EX-106|Y
01|190720|9|1|NBT50-C12EX-95|Y
01|190720|11|2|NBT50-FMH19.05-47-90 / NBT50 3/4SMH X 3.00|Y
01|190720|12|1|NBT50-MDSK16-135|Y
01|190723|2|1|MOQ = 10 pcs on new makes|Y
01|190723|3|1|MOQ = 10 pcs|Y
01|190723|4|1|MOQ = 10 pcs|Y
01|190735|9|1|This is an alternative to P/N: C5006-0250-4.00|Y
01|190735|9|2|Includes a balanceable feature. If not required it will|Y
01|190735|9|3|function exactly the same. Special price to move stock.|Y
01|190735|9|4|Closeout product. Non-returnable.|Y
01|190758|1|1|Can use for 6mm (.236) cutting tool|Y
01|190774|2|1|Needed for live tool|Y
01|190774|3|1|Needed for live tool.|Y
01|190805|5|1|Please Note: This item is discontinued.|Y
01|190805|5|2|No Safety Recess. Body may interfere with ATC Arm. Also|Y
01|190805|5|3|these holders take a different wrench the nose diameter|Y
01|190805|5|4|is 64mm. Wrench # 9HC25|Y
01|190805|7|1|Delivery: We currently have 64 in stock/Balance|Y
01|190805|7|2|due 03-25.|Y
01|190805|10|1|These holders have chip holes.|Y
01|190805|11|1|No Chip Hole in these holders.|Y
01|190809|1|1|Option #1 for MD Tooling OKU1762540|Y
01|190809|2|1|Option #2 for MD Tooling OKU1762540|Y
01|190809|3|1|Option #1 for MD Tooling OKU0092540|Y
01|190809|4|1|Option #2 for MD Tooling OKU1762540|Y
01|190809|5|1|Option #1 for MD Tooling OKU0133810|Y
01|190809|6|1|Option #2 for MD Tooling OKU0133810|Y
01|190832|1|1|1st Batch *Please provide the drawingMFGInstockUPD10/2|Y
01|190832|2|1|1st Batch *Please provide the drawingMFGInstockUPD10/2|Y
01|190837|2|1|KM2-32|Y
01|190837|3|1|km2-42|Y
01|190853|1|1|1st Batch/Install E25-NUT&ER25-SCREW(C) 9/28:APRVD/BT|Y
01|190853|2|1|1st Batch/(3)927343 9/28:DWG Approved/BT Saved Teams|Y
01|190853|3|1|1st Batch DWG @ Engineering|Y
01|190853|4|1|1st Batch DWG@Engineering|Y
01|190853|5|1|1st Batch DWG @ Engineering|Y
01|190853|6|1|1st Batch/931350 TJ Aerospace|Y
01|190868|4|1|P/N: OKE4-C4Z-85-ICE|Y
01|190868|4|2|Okuma Live BMT60; S1=76mm Drive Tang Length|Y
01|190868|4|3|CAPTO 4; 90Deg Head; L1=85mm; INT/TXT Coolant/ICE|Y
01|190870|1|1|Sigma 7 Motors|Y
01|190872|1|1|I will get you a lead time|Y
01|190872|2|1|71 in stock and balance due 2/10|Y
01|190872|3|1|48 in stock and I will get you a lead time on balance|Y
01|190872|4|1|In stock|Y
01|190872|5|1|In stock|Y
01|190903|4|1|With Standard flange assembly with positioning pin|Y
01|190903|5|1|With Standard flange assembly with positioning pin|Y
01|190903|6|1|With Standard flange assembly with positioning pin|Y
01|190905|22|1|*stocked alternative for SE3-18.0x14.0|Y
01|190919|1|1|Part# NB3006-0625-1.75|Y
01|190919|1|2|BT30 Dual contact 5/8 end mill holder with 1.75 GL|Y
01|190919|2|1|Part # NB3006-0750-2.25|Y
01|190919|2|2|BT30 Dual Contact 3/4 Dia end mill holder with 2.25 GL|Y
01|190919|4|1|Part # NB3006-0625-1.61|Y
01|190919|4|2|NBT30 Dual Contact 5/8 End Mill Holder with 1.61 GL|Y
01|190919|5|1|Part # NB3006-0750-1.61|Y
01|190919|5|2|NBT30 Dual Contact 3/4 End Mill with 1.61 GL|Y
01|190920|1|1|Part# NB3006-0625-1.75|Y
01|190920|1|2|BT30 Dual contact 5/8 end mill holder with 1.75 GL|Y
01|190920|2|1|Part # NB3006-0750-2.25|Y
01|190920|2|2|BT30 Dual Contact 3/4 Dia end mill holder with 2.25 GL|Y
01|190925|3|1|Replaces P-111L005|Y
01|190925|5|1|P111R010 Price and delivery pending|Y
01|190926|2|1|500-007 on B/O ETA approx 1/30|Y
01|190938|2|1|**6 projection|Y
01|190938|4|1|**Replacement nuts.|Y
01|190938|4|2|**Nuts will come on tool holder: NC5007-0032-4.00G|Y
01|190938|7|1|**Replacement nut|Y
01|190938|7|2|**Nuts will come on tool holder: NC5007-0032-6.00G|Y
01|190938|12|1|*replacement nut|Y
01|190938|14|1|*replacement nut|Y
01|190943|10|1|Part # HSK100A-SK20C-250P|Y
01|190943|10|2|This item is considered special and once ordered cannot|Y
01|190943|10|3|be cancelled or returned.|Y
01|190944|1|1|Option #1 for MD Tooling OKU1762540|Y
01|190944|2|1|Option #2 for MD Tooling OKU1762540|Y
01|190944|3|1|Option #1 for MD Tooling OKU0092540|Y
01|190944|4|1|Option #2 for MD Tooling OKU1762540|Y
01|190944|5|1|Option #1 for MD Tooling OKU0133810|Y
01|190944|6|1|Option #2 for MD Tooling OKU0133810|Y
01|190952|1|1|Mimatic # AGW-BMT-C-65-C4B-1 /Lyndex-Nikken part|Y
01|190952|1|2|number to be determined. Mimatic drawing# A197603|Y
01|190952|2|1|Mimatic # AGW-BMT-C-65-C4B-1 /Lyndex-Nikken part|Y
01|190952|2|2|number to be determined. Mimatic drawing# A197602|Y
01|190960|1|1|KM1.1/4-MT3 sleeve|Y
01|190960|1|2|Quoted at NET pricing|Y
01|190967|1|1|Offered in place of Guhring HSK-A63|Y
01|190968|1|1|Minimun QTY 5pcs|Y
01|190968|2|1|H100A-SF0187-3.74CP|Y
01|190968|2|2|Min QTY 5pcs|Y
01|190968|3|1|H100A-SF0187-3.74CP|Y
01|190968|3|2|Min QTY 5pcs|Y
01|190999|1|1|for new MU-8000|Y
01|191003|2|1|Please Note: This tool holder is non standard stock.|Y
01|191003|2|2|Once a purchase order is placed it cannot be cancelled|Y
01|191003|2|3|or returned. Lyndex-Nikken considers complete the|Y
01|191003|2|4|10-pcs quoted. If customer requires anymore delivery|Y
01|191003|2|5|and price will change.|Y
01|191003|3|1|Charge for etching tooling. However I am not sure they|Y
01|191003|3|2|can etch the SK6-1/8A if is very small.|Y
01|191007|1|1|Includes 7 Scroll Chuck|Y
01|191008|1|1|Includes Sigma 1 Motor and Cables.|Y
01|191017|1|1|This item does not have a safety recess and may|Y
01|191017|1|2|interfere with the ATC arm.|Y
01|191017|1|3|In order to avoid this order longer 85mm length|Y
01|191025|1|1|1st Batch/(4)920387 *4/17/20:DWG Approved/ARMFG10/21>E|Y
01|191034|1|1|$10000.00 Tooling Certificate|Y
01|191039|1|1|Item is discontinued.|Y
01|191039|1|2|We currently have 4ea in stock.|Y
01|191049|1|1|Please allow 3 weeks delivery ARO|Y
01|191049|6|1|Please allow 4-5 weeks delivery ARO|Y
01|191051|1|1|INCLUDES SOLENOID BLOCK 2 PROXIMITY SWITCHES|Y
01|191051|1|2|INCLUDES AIR LINES AND FITTINGS|Y
01|191053|1|1|Main Arbor - Part# CAT50U-AF1-30-OH|Y
01|191053|1|2|Material is Cast Iron - Hole diameter is .74 +/- .008|Y
01|191053|1|3|D - Facing diameter is 1.417 +/- .02|Y
01|191053|1|4|t - Facing depth is to cleanup approx .050|Y
01|191053|1|5|T - Thickness is .88|Y
01|191053|1|6|h - Space is wide open as it's a flange|Y
01|191053|2|1|Arbor for above Part # BF130-18.8-36-22.4C|Y
01|191053|3|1|Byte for above Part # 9BF130-18.8-36-22.4C-W|Y
01|191053|3|2|MOQ = 5|Y
01|191054|1|1|Lyndex-Nikken Part Number TBD.|Y
01|191054|1|2|Alps part #AC4-XXAA133-4K000R/L Capto C4 Tool Block|Y
01|191072|1|1|NCAT50-SF1000-12.00 NCAT50 Dual Contact Shrink Fit|Y
01|191072|1|2|holder.|Y
01|191073|1|1|SPECIAL ONE-TIME PRICING ALLOWING AN ADDITIONAL 5%|Y
01|191073|1|2|DISCOUNT TOTAL DISCOUNT 35% MAX.|Y
01|191074|1|1|SPECIAL ONE-TIME PRICING ALLOWING AN ADDITIONAL 5%|Y
01|191074|1|2|DISCOUNT TOTAL DISCOUNT 35% MAX.|Y
01|191085|8|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|191086|8|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|191087|8|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|191100|1|1|SPECIALS|Y
01|191100|1|2|NON-CANCELABLE|Y
01|191100|1|3|NON-RETURNABLE|Y
01|191106|1|1|Replaces part #E32-17SC(Same setdifferent part #)|Y
01|191106|2|1|Replaces part #E32-21SC(Same setdifferent part #)|Y
01|191108|4|1|Includes: Dual axis drive short bar fiber optic cable|Y
01|191108|4|2|communications cablesexternal cables paremter changes|Y
01|191108|4|3|service time and travel.|Y
01|191108|4|4|Includes mounting of solenoids x4 and running air lines|Y
01|191108|4|5|from chucks/tailstocks to cabinet|Y
01|191120|1|1|HSK63T-180-TH20R-105 Right Hand Turning Tool 20mm|Y
01|191134|1|1|This item is a non-standard stock item and is|Y
01|191134|1|2|considered special once an order is placed it cannot|Y
01|191134|1|3|be cancelled or returned.|Y
01|191149|1|1|65mm Riser increase tilt angle to 0-141 degrees|Y
01|191149|1|2|Hydraulic Brake|Y
01|191151|2|1|Optional but Recommended|Y
01|191162|1|1|Item is a non cancelablenon returnable item|Y
01|191172|1|1|Hydraulic Braking|Y
01|191172|2|1|500 PSI Hydraulic Unit for Table Brake Systems|Y
01|191172|3|1|Installation Includes: Travel Labor Installation|Y
01|191172|3|2|components and/or wiring for 5AX rotary table and|Y
01|191172|3|3|hydraulic unit. We will install rotary table and hyd|Y
01|191172|3|4|unit set parameters and zeros.  Machine will be ready|Y
01|191172|3|5|for production set up when we are finished.|Y
01|191172|3|6|***THIS PRICING IS BASED ON LYNDEX NIKKEN BEING ABLE TO|Y
01|191172|3|7|INSTALL ALL THREE MACHINES IN ONE VISIT.***|Y
01|191172|3|8|**INSTALLATIONS ARE QUOTED IN NET PRICING ONLY**|Y
01|191172|3|9|*PRICING WILL NEED REQUOTED IF INSTALLS ARE SEPARATED|Y
01|191172|3|10|INTO MORE THAN ONE VISIT.*|Y
01|191172|6|1|20pcs Per Machine|Y
01|191172|7|1|1 Set Per Machine|Y
01|191172|8|1|1 Set Per Machine|Y
01|191172|9|1|1pc Per Machine|Y
01|191172|10|1|3pcs Per Machine|Y
01|191172|11|1|1 Set Per Machine|Y
01|191172|12|1|1pc Per Machine|Y
01|191172|13|1|2pcs Per Machine|Y
01|191172|14|1|2pcs Per Machine|Y
01|191172|15|1|1pc Per Machine|Y
01|191172|16|1|1pc Per Machine|Y
01|191172|17|1|25pcs Per Machine|Y
01|191179|2|1|Haas Certified Scale + Cable|Y
01|191179|2|2|Includes L/N Scale Mounting Kit and Cover|Y
01|191179|3|1|Includes labor/time/travel|Y
01|191179|3|2|Machine must have scale option from factory|Y
01|191179|3|3|as well as 3rd party rotary software installed for|Y
01|191179|3|4|Next Gen Controller|Y
01|191186|2|1|BT50 Blank Bar with 5diameter and 3 projection|Y
01|191186|2|2|(Diameter can be bigger or a little smaller)|Y
01|191193|1|1|This item is a non cancelablenon returnable special|Y
01|191243|1|1|Replaces C5016-1000-6.00|Y
01|191243|2|1|Replaces C5026-0750-6.00|Y
01|191243|3|1|Replaces C5026-0500-6.00|Y
01|191243|4|1|Replaces C5026-1000-6.00|Y
01|191243|5|1|Replaces C5026-0500-6.00|Y
01|191243|12|1|Replaces S1005-0562-7.63|Y
01|191243|13|1|Repolaces S1005-0875-9.05|Y
01|191243|15|1|Replaces C5027-0032-8.00|Y
01|191243|16|1|Replaces C5017-0032-6.00|Y
01|191243|17|1|Replaces C5027-0032-6.00|Y
01|191243|18|1|Wrench for the ER32 Collet Chucks|Y
01|191250|27|1|*Corresponding coolant disc for CCK1.1/4-16|Y
01|191250|29|1|*Corresponding coolant disc for CCK1.1/4-1|Y
01|191254|1|1|2 IN STOCK; 10 DUE 2/10 & BALANCE TBD|Y
01|191258|1|1|Delv = 3wks after receving PO & approval dwg is signed|Y
01|191258|2|1|Custom Positioning Block for Kuraki w/ taper hole|Y
01|191258|2|2|Delv = 3wks after receving PO & approval dwg is signed|Y
01|191259|2|1|Option #1|Y
01|191259|3|1|Option #2|Y
01|191260|2|1|Option #1|Y
01|191260|3|1|Option #2|Y
01|191261|2|1|TAT-105 Disassemble Washing and Inspection Fee.|Y
01|191261|2|2|If you order repair or new one will deny this cost.|Y
01|191261|3|1|Usually repair cost MAX is around $2500|Y
01|191261|7|1|TCD-73663-R|Y
01|191261|7|2|4 + 1 Port Rotary Joint|Y
01|191262|2|1|CNC180MA Disassemble Washing and Inspection Fee.|Y
01|191262|2|2|If you order the repair we will deny this cost.|Y
01|191262|6|1|Modification cost include Motor(A4/5000iF) cables|Y
01|191262|6|2|gears gearbox motor cover 80mm cable cover|Y
01|191262|6|3|Labor and etc. (Gear box delivery is 8-9weeks)|Y
01|191262|10|1|Motor: A4/5000iF 80mm Cable box|Y
01|191262|11|1|x2 pcs in stock x2 pcs around 8 weeks + Ship|Y
01|191263|1|1|Motors and cables will need to be provided by Haas|Y
01|191267|3|1|Installation includes: Dual axis drive bulkhead cables|Y
01|191267|3|2|external cables parameter changes service time and|Y
01|191267|3|3|travel.|Y
01|191268|2|1|3000PSI 3-stack solenoid and pressure switch set up.|Y
01|191268|2|2|NSP-10-15V1A3-F3-W1777 pump|Y
01|191268|2|3|SA-G01-AX3-GR-D2-31 solenoid|Y
01|191268|3|1|Installation includes: Drive unit short bar fiber|Y
01|191268|3|2|optic cable communications cable bulkhead cables|Y
01|191268|3|3|external cables parameter changes service time and|Y
01|191268|3|4|travel. Includes wiring workholding M-codes from tank|Y
01|191268|3|5|to provided I.O locations.|Y
01|191269|45|1|Replaces SKN-10BJ|Y
01|191269|47|1|Replaces SKN-6WBJ|Y
01|191280|1|1|quote will actually be for 150 to 200 pieces|Y
01|191280|1|2|Machine is a DMG MORI NHX5000|Y
01|191291|10|1|NBT50-C42-105|Y
01|191291|10|2|NBT50 Dual Contact 42mm Milling Chuck|Y
01|191298|1|1|CAT50-SF0500-4.00 CAT50 Shrink Fit Holder 1/2|Y
01|191298|2|1|CAT50-SF0500-4.00 CAT50 Shrink Fit Holder 1/2|Y
01|191298|2|2|with Coolant Ports|Y
01|191303|5|1|#17|Y
01|191303|6|1|#28|Y
01|191304|1|1|**NET PRICE|Y
01|191304|1|2|Special- cannot be returned or cancelled|Y
01|191305|2|1|CAT40 POTS INCLUDED AT NO COST WITH MACHINE|Y
01|191306|1|1|One time special discount|Y
01|191323|1|1|RGA#TAR-59128|Y
01|191323|1|2|5AX-2002FA-M|Y
01|191323|1|3|SN:1524|Y
01|191333|2|1|INCLUDES: (2) SF-POT-#40; (1) CAT40-SF0125-5.12;|Y
01|191333|2|2|(1) CAT40-SF0250-3.15CP; (1) CAT40-SF0250-5.12CP;|Y
01|191333|2|3|(1) CAT40-SF0375-3.15CP; (1) CAT40-SF0375-5.12CP;|Y
01|191333|2|4|(1) CAT40-SF0500-3.15CP; (1) CAT40-SF0500-5.12CP;|Y
01|191333|2|5|(1) CAT40-SF0625-3.15CP; (1) CAT40-SF0625-5.12CP;|Y
01|191333|2|6|(1) CAT40-SF0750-3.15CP & INSTALL/TRAINING|Y
01|191359|7|1|This item is considered a Special. Once a PO is placed|Y
01|191359|7|2|with factory it may not be cancelled or returned.|Y
01|191359|7|3|ETA approx 3-4 weeks after receipt of PO.|Y
01|191362|1|1|Please Note: Minimum order quantity is 3 holders.|Y
01|191376|2|1|2 stock in L-N +2 8-10weeks|Y
01|191378|1|1|Mimatic#121316|Y
01|191378|1|2|Drive adaptor|Y
01|191378|1|3|similar 123363 but for Okuma LU3000EX|Y
01|191378|4|1|PO#10102771 DWG#60693|Y
01|191378|4|2|OKUMA live series: LU-3000 EX (with disc turret)|Y
01|191378|4|3|circular saw holder straight-version|Y
01|191378|4|4|Shank BMT 60 LU3000EX; Drive-2flat; Toolholder for saw|Y
01|191378|4|5|blades w/polygon interface;Quadrogon size25-(max.100mm|Y
01|191378|4|6|25mm);coolant supply external via spray nozzle;|Y
01|191378|4|7|no reversal of direction of rotation(drive direction|Y
01|191378|4|8|equal to output direction)equal to output direction)|Y
01|191378|4|9|LI-95mm; gear ratio: i(n1/n2)=2.66:1;M(max)=40Nm;|Y
01|191378|4|10|nl(max)=6500rpm;n2(max)-2450rpm;6100kg|Y
01|191382|1|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|191382|2|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|191382|3|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|191382|4|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|191382|19|1|Straight Shank Extension OD16mm Shrink Fit Holder 5.5mm|Y
01|191387|1|1|**Direct chuck w/ 1 tool|Y
01|191387|3|1|Direct chuck w/ 1.1/4 tool or sleeve down to 1|Y
01|191387|4|1|*non-coolant|Y
01|191389|1|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|191389|2|1|Req.INS/Install S7/16-20X3/8|Y
01|191389|3|1|1st Batch/Install E25-NUT *DWG@Teams File & Email|Y
01|191389|4|1|1st Batch/Install E20-NUT *DWG@Teams File & Email|Y
01|191389|5|1|1st Batch/Install E32-NUT *DWG@Teams File & Email|Y
01|191402|4|1|Option One: Plastic Handle|Y
01|191402|5|1|Option Two: Aluminum Handle|Y
01|191412|1|1|Showroom Table never used|Y
01|191412|5|1|Installation includes mounting and parameter settings|Y
01|191412|5|2|Third party software require for Next Gen control.|Y
01|191432|16|1|The longest projection we carry is 1.19|Y
01|191432|17|1|similar to type #1 BT30-BHC20-38 but in type 216mm|Y
01|191432|17|2|68mm length.|Y
01|191432|17|3|Comp to NT TOOL #2120 00016068 BT30-TSB16|Y
01|191432|17|4|Item is a special that is non cancelable nor returnabl|Y
01|191455|1|1|This table will be prepped to match the existing table|Y
01|191455|1|2|that C&A currently has in for service.|Y
01|191456|1|1|INTERNAL CABLE SET CNC250 WITH A6/2000 MOTOR|Y
01|191456|1|2|POWER + FEEDBACK + LOOSE WIRES FOR SOLENOID/SIGNALS|Y
01|191458|1|1|**Direct chuck w/ 1 tool|Y
01|191458|4|1|Direct chuck w/ 1.1/4 tool or sleeve down to 1|Y
01|191458|5|1|*non-coolant|Y
01|191465|1|1|RGA#TAR-59168|Y
01|191465|1|2|SN:1103|Y
01|191478|4|1|NC4001-0750-6.00CP|Y
01|191478|4|2|NCAT40 Dual Contact Shell Mill Holder 3/4 6 proj|Y
01|191478|6|1|NC4001-1000-6.00CP|Y
01|191478|6|2|NCAT40 Dual Contact Shell Mill Holder 1 6 proj|Y
01|191478|29|1|NCAT40-SF6-160CP|Y
01|191478|31|1|NCAT40-SF8-130CP|Y
01|191478|32|1|NCAT40-SF8-160CP|Y
01|191478|35|1|NCAT40-SF10-160CP|Y
01|191478|37|1|NCAT40-SF12-130CP|Y
01|191478|38|1|NCAT40-SF12-160CP|Y
01|191478|40|1|NCAT40-SF14-130CP|Y
01|191478|41|1|NCAT40-SF14-160CP|Y
01|191478|54|1|NC4007-0040-5.00G|Y
01|191478|60|1|NC4006-0500-6.00CP|Y
01|191478|60|2|**MOQ: 10pcs|Y
01|191478|62|1|NC4006-0625-4.00CP|Y
01|191478|62|2|**MOQ: 10pcs|Y
01|191478|63|1|NC4006-0625-6.00CP|Y
01|191478|63|2|**MOQ: 10pcs|Y
01|191478|65|1|NC4006-0750-4.00CP|Y
01|191478|65|2|**MOQ: 10pcs|Y
01|191478|66|1|NC4006-0750-6.00CP|Y
01|191478|66|2|**MOQ: 10pcs|Y
01|191478|80|1|Mazak Standard Coolant Through Pull Stud|Y
01|191481|1|1|C4006-0250-2.50-JS CAT40 End Mill Holder 1/4 Jet Slots|Y
01|191481|3|1|Quoted at Net price.|Y
01|191482|1|1|NEW TRADE IN PRICING|Y
01|191482|1|2|REPLACEMENT OF TAR-59168|Y
01|191488|1|1|RGA#TAR-58952|Y
01|191488|1|2|5AX-201  SN:6413|Y
01|191495|1|1|Face Value $150000|Y
01|191495|1|2|Tax = $918.75|Y
01|191496|2|1|Customer providing balluf chip to be installed on|Y
01|191496|2|2|holder and balanced included in price of toolholder|Y
01|191496|3|1|HS coolant nut installed included in price of holder|Y
01|191496|4|1|Coolant back-up screw and coolant tube installed|Y
01|191496|4|2|included in price of toolholder|Y
01|191496|6|1|Customer providing balluf chip to be installed on|Y
01|191496|6|2|holder and balanced included in price of toolholder|Y
01|191496|7|1|HS coolant nut installed included in price of holder|Y
01|191496|8|1|Coolant back-up screw and coolant tube installed|Y
01|191496|8|2|included in price of toolholder|Y
01|191497|1|1|1pc in stock in IL WH / 1pc in stock at factory in JPN|Y
01|191497|1|2|with ETA of approx 10 business days. Any greater qty|Y
01|191497|1|3|will be apprx 14 weeks lead time. Price quoted is for|Y
01|191497|1|4|any quantity 1-12pcs.|Y
01|191503|4|1|Due 3/10|Y
01|191503|5|1|Due 3/10|Y
01|191504|1|1|Tilting Rotary table (Rotary axis is w/o motorTilting|Y
01|191504|1|2|axis is with AA21 controlM signal cabledirect mt cbl)|Y
01|191504|1|3|Includes 65mm riser 4+1p rotary joint TCE-97751 Power|Y
01|191504|1|4|signal cable TCE-97752 Feed back cable TCE-96597 N|Y
01|191504|1|5|Number serch cable TCE-96589 External power cable|Y
01|191504|1|6|Quoted as net pricing|Y
01|191504|1|7|Non cancellable Non returnable after receiving PO|Y
01|191504|3|1|Air Freight|Y
01|191506|1|1|P/N 169495 - 15mm Reaming Head - Straight Flute|Y
01|191506|1|2|Type RPK40J - TINAMATIC-3 coating|Y
01|191506|3|1|P/N 169208 - Reamer Body - Type RPS400|Y
01|191506|3|2|16mm Diameter Shank x 110mm Length with Reamer Head|Y
01|191513|1|1|CAT50-SF0500-4.00 CAT50 Shrink Fit Holder 1/2|Y
01|191513|2|1|CAT50-SF0500-4.00 CAT50 Shrink Fit Holder 1/2|Y
01|191513|2|2|with Coolant Ports|Y
01|191515|1|1|Req.INS/T/P Inspection RequiredMFG1/E>2/28#2UPD12/12>(|Y
01|191520|1|1|RGA#LVR-59164/|Y
01|191520|1|2|Repair of MZMP5-ER40Z-ICE s/n:18900271 06|Y
01|191520|1|3|(Mimatic#131597)|Y
01|191520|2|1|Bearings seals and o-rings to be replaced.|Y
01|191523|1|1|1st Batch/923616 Bicen/MURATA 8/30:DWG Approved/Custome|Y
01|191527|1|1|LYN Part#  MZQT5-ER11(X)-OFF|Y
01|191527|1|3|MAZAK LIVE U-DRILL ER11;|Y
01|191527|1|4|EXTERNAL COOLANT;|Y
01|191527|1|5|1:2 GEAR MAX 10Nm;|Y
01|191527|1|6|REF DRWG# 00021234;|Y
01|191527|1|7|Qty Break NET Pricing:|Y
01|191527|1|8|1pc  $18317.00ea/net|Y
01|191527|1|9|2pc  $14144.00ea/net|Y
01|191527|1|10|3pc  $11750.00ea/net|Y
01|191553|5|1|Net Price|Y
01|191553|5|2|LYN to make block upon receipt of spindle drawing|Y
01|191553|5|3|Delv 3-5days|Y
01|191561|1|1|RGA#LVR-59093/|Y
01|191561|1|2|Repair of MNZ20-ER32Z s/n:A0115 (Alps#T32476)|Y
01|191561|2|1|Bearings o-rings collet nut and spindle to be|Y
01|191561|2|2|replaced. If the spindle can be reused the cost will|Y
01|191561|2|3|be $1676.00|Y
01|191563|15|1|** Closeout Promotion! All sales are FINAL!**|Y
01|191564|1|1|RGA#LVR-59150/|Y
01|191564|1|2|Repair of MNL12-ER32X s/n:A3881 (Alps#T32206)|Y
01|191564|2|1|Bearings seals o-rings collet nut and spindle to be|Y
01|191564|2|2|replaced.|Y
01|191575|1|1|Quoted at NET price.|Y
01|191578|6|1|Replaces NIK-1555-300|Y
01|191581|1|1|Lyndex Part # MNZ20-ER16X-OFF-HS2|Y
01|191581|1|2|MORI LIVE BMT40; ER16 STRAIGHT OFFSET;|Y
01|191581|1|3|L=approx 90mm; offset apprx = 13mm; EXT COOLANT|Y
01|191581|1|4|1:2 GEAR MAX 10Nm;MAX INPUT 6500 RPM;MAX OUTPUT 13K RPM|Y
01|191581|1|5|REF SIMIMAR DRWG # 00045259 BUT FOR MORI LIVE BMT40|Y
01|191588|1|1|RGA#LVR-59151/|Y
01|191588|1|2|Repair of OKE4-ER40X s/n:AL0059 (Alps#OKA01-13000)|Y
01|191588|2|1|Bearings seals o-rings collet nut and spindle to be|Y
01|191588|2|2|replaced. If the spindle can be reused the cost will|Y
01|191588|2|3|be $945.20|Y
01|191595|1|1|15 PCS in JAPAN - 2to3 weeks ETA after receipt of PO|Y
01|191603|1|1|1st Batch|Y
01|191603|2|1|T/P Inspection Required|Y
01|191604|1|1|RGA#LVR-59137/|Y
01|191604|1|2|Rpair of MZQT47-ER16-AD-HS s/n:87074 01|Y
01|191604|1|3|(Mimatic#125054)|Y
01|191604|2|1|Bearings seals o-rings and bevel gears for input|Y
01|191604|2|2|spindle to be replaced.|Y
01|191604|4|1|RGA#LVR-59137/|Y
01|191604|4|2|Rpair of MZQT47-ER16-AD-HS s/n:87074 02|Y
01|191604|4|3|(Mimatic#125054)|Y
01|191604|5|1|Bearings seals o-rings and bevel gears for input|Y
01|191604|5|2|spindle to be replaced.|Y
01|191605|1|1|1st Batch/For stock 2/19/20:DWG Approved/ARMFG12/16>1|Y
01|191611|1|1|T11045A02|Y
01|191611|1|2|C5 conversion adapter|Y
01|191611|2|1|T11044|Y
01|191611|2|2|C4 conversion adapter|Y
01|191611|3|1|T11056|Y
01|191611|3|2|C6 conversion adapter|Y
01|191624|4|1|TCE-A7088 Power cable for CNC202LFA|Y
01|191624|5|1|TCE-96743 Feedback cable for CNC202LFA|Y
01|191624|9|1|*Base plate by aluminum was supplied from the customer|Y
01|191624|9|2|last time|Y
01|191624|17|1|Air freight for CNC202 and parts|Y
01|191624|18|1|Air freight for 5AX-4MT and parts|Y
01|191660|1|1|Delivery: 3-pcs stock 7-pcs ETA to L-N 01-25 balance|Y
01|191660|1|2|12 weeks.|Y
01|191689|1|1|Centerline Height = 105mm|Y
01|191689|2|1|Centerline Height = 135mm|Y
01|191727|1|1|Note: Discontinued model tooling certificate is not|Y
01|191727|1|2|included|Y
01|191736|1|1|Completed RAH Form required for PO acceptance.|Y
01|191760|1|1|We will have more in 4 weeks.  Live Free wants 10.|Y
01|191778|3|1|Part# CAT40-SF10-160CP-DIN-M|Y
01|191778|3|2|This is special once an order is placed it cannot be|Y
01|191778|3|3|cancelled or returned.|Y
01|191789|1|1|RGA#LVR-59188/|Y
01|191789|1|2|Repair of MNZ20-SK16X-ICE-12K s/n:20905017 19|Y
01|191789|1|3|(Mimatic#193568)|Y
01|191789|2|1|Bearings seals and o-rings to be replaced.|Y
01|191789|4|1|RGA#LVR-59188/|Y
01|191789|4|2|Repair of MNZ20-SK16Z-ICE-12K s/n:20905241 11|Y
01|191789|4|3|(Mimatic#193643)|Y
01|191789|5|1|Bearings seals and o-rings to be replaced.|Y
01|191792|3|1|Installation inlcudes: Drive unit short bar fiber|Y
01|191792|3|2|optic cable communications cable bulkhead cables|Y
01|191792|3|3|external cables parameter changes service time and|Y
01|191792|3|4|travel.|Y
01|191795|1|1|RGA#TAR-59166|Y
01|191795|1|2|5AX-201OSP4-ME40|Y
01|191795|1|3|SN:6182|Y
01|191802|1|1|Items are non returnable non-cancelable speicials|Y
01|191802|1|2|Net price includes the following parts for assembly|Y
01|191802|1|3|at Lyndex-Nikken: HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|191802|1|4|customer's supplied RFID chip and holder re-balanced.|Y
01|191802|2|1|Customer providing balluf chip to be installed on|Y
01|191802|2|2|holder and balanced included in price of toolholder|Y
01|191802|3|1|HS coolant nut installed included in price of holder|Y
01|191802|4|1|Coolant back-up screw and coolant tube installed|Y
01|191802|6|1|Items are considered non cancelablenon returnable|Y
01|191802|6|2|Net price includes the following parts for assembly|Y
01|191802|6|3|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|191802|6|4|customer's supplied RFID chip and holder re-balanced.|Y
01|191802|7|1|Customer providing balluf chip to be installed on|Y
01|191802|7|2|holder and balanced included in price of toolholder|Y
01|191802|8|1|HS coolant nut installed included in price of holder|Y
01|191802|9|1|Coolant back-up screw and coolant tube installed|Y
01|191802|9|2|included in price of toolholder|Y
01|191802|11|1|Items are non-cancelablenon-returnable specials|Y
01|191802|11|2|Net price includes the following parts for assembly|Y
01|191802|11|3|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|191802|11|4|customer's supplied RFID chip and holder rebalanced|Y
01|191802|12|1|Customer providing balluf chip to be installed on|Y
01|191802|12|2|holder and balanced included in price of toolholder|Y
01|191802|13|1|HS coolant nut installed included in price of holder|Y
01|191802|14|1|Coolant back-up screw and coolant tube installed|Y
01|191802|14|2|included in the price of the holder|Y
01|191805|1|1|NBT40-C25-70G|Y
01|191805|4|1|NBT40-C32-85G|Y
01|191805|7|1|SK13-6P|Y
01|191805|8|1|SK13-4P|Y
01|191820|2|1|Installation includes: Drive unit short bar fiber|Y
01|191820|2|2|optic cables bulkhead cables external cables|Y
01|191820|2|3|parameter changes service time and travel.|Y
01|191824|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|191835|1|1|1st Batch *10/4:DWG Saved in Teams File|Y
01|191835|2|1|1st Batch/DWG Saved in Teams File|Y
01|191835|3|1|1st Batch *10/4:DWG Saved in Teams File|Y
01|191835|4|1|1st Batch/Stock *DWG saved in Teams File/Log|Y
01|191872|24|1|Replaces SKN-10BJ|Y
01|191872|28|1|ITEM CANNOT BE PURCHASED UNTIL PRICING IS UPDATED|Y
01|191872|38|1|Tubes needed for coolant thru|Y
01|191872|39|1|wrench for SK10 holders|Y
01|191872|40|1|wrench for SK16 holders|Y
01|191872|41|1|wrench for SK25 holders|Y
01|191873|1|1|QCFC 65 Series Self Contained Pneumatic Chuck|Y
01|191873|1|2|Pratt Burnerd - ATL209-65BZI  Atlas air power collet|Y
01|191873|1|3|chuck with recess flatback mount.  Uses QCFC 65 Series|Y
01|191873|1|4|collets.|Y
01|191873|2|1|Adapter plate for mounting the ATL209-65BZI chuck to|Y
01|191873|2|2|5AX-2002 table.|Y
01|191873|3|1|Other needed components including: Manifold Air Lines|Y
01|191873|3|2|(rigid and flexible) Solenoid and Wiring.|Y
01|191873|4|1|Installation includes mounting and plumbing chuck and|Y
01|191873|4|2|air lines @ Lyndex Nikken. Then a service tech will|Y
01|191873|4|3|bring table back to C&A Tool and reinstall on Mori|Y
01|191873|4|4|NV5000 VMC.  Along with reinstalling table on VMC we|Y
01|191873|4|5|will install solenoid air lines from table to inside|Y
01|191873|4|6|machine cabinet.  Solenoid will be wired to spare M|Y
01|191873|4|7|codes.  We will also check table condition and ensure|Y
01|191873|4|8|everything is functioning as it should.|Y
01|191880|2|1|Net ea price.One time special discount.|Y
01|191888|1|1|RGA#CUR-59221/|Y
01|191888|1|2|Repair of CAT40U-NX5-153 s/n: PDOE-031|Y
01|191890|7|1|ISO45 SPINDLE|Y
01|191890|8|1|ISO45 MASTER GAUGE|Y
01|191891|7|1|ISO45 SPINDLE|Y
01|191891|8|1|ISO45 MASTER GAUGE|Y
01|191892|7|1|ISO45 SPINDLE FOR E346+|Y
01|191892|8|1|ISO45 MASTER GAUGE|Y
01|191892|9|1|INSTALLATION FOR E346PLUS|Y
01|191892|16|1|TRAINING FOR E46LA|Y
01|191893|1|1|1 - 9 piece pricing|Y
01|191893|2|1|10 - 19 piece pricing|Y
01|191893|3|1|20+ piece pricing|Y
01|191902|1|1|Pricing includes: 5C Dead lenght collet closer with|Y
01|191902|1|2|hydraulic pancake cylinders and top and bottom manifold|Y
01|191902|1|3|INCLUDES: TCD-38059 X 4 + 5C-HYD-FIXTURE-DL X 4|Y
01|191902|2|1|8-piece price|Y
01|191902|2|2|INCLUDES: TCD-38059 X 8 + 5C-HYD-FIXTURE-DL X 8|Y
01|191903|1|1|Alternate to discontinued S1005-0562-7.67|Y
01|191904|3|1|External Cables (cutting area)|Y
01|191904|3|2|Length TBD at time of order|Y
01|191908|1|1|QCFC 65 Series Self Contained Pneumatic Chuck|Y
01|191908|1|2|Pratt Burnerd - ATL209-65BZI  Atlas air power collet|Y
01|191908|1|3|chuck with recess flatback mount.  Uses QCFC 65 Series|Y
01|191908|1|4|collets.|Y
01|191908|2|1|Adapter plate for mounting the ATL209-65BZI chuck to|Y
01|191908|2|2|5AX-2002 table.|Y
01|191908|3|1|Other needed components including: Manifold Air Lines|Y
01|191908|3|2|(rigid and flexible) Solenoid and Wiring.|Y
01|191908|4|1|Installation includes mounting and plumbing chuck and|Y
01|191908|4|2|air lines @ Lyndex Nikken. Then a service tech will|Y
01|191908|4|3|bring table back to C&A Tool and reinstall on Mori|Y
01|191908|4|4|NV5000 VMC.  Along with reinstalling table on VMC we|Y
01|191908|4|5|will install solenoid air lines from table to inside|Y
01|191908|4|6|machine cabinet.  Solenoid will be wired to spare M|Y
01|191908|4|7|codes.  We will also check table condition and ensure|Y
01|191908|4|8|everything is functioning as it should.|Y
01|191911|1|1|1c|Y
01|191911|2|1|1d|Y
01|191911|3|1|19a|Y
01|191911|4|1|20a|Y
01|191918|1|1|ELBO PFM PULLING FORCE METER with #40/#50 cone|Y
01|191918|2|1|40 UNC 5/8-11 CONE BUSHING|Y
01|191918|3|1|50 UNC 1-8 CONE BUSHING|Y
01|191925|7|1|PRE-GAUGE-C8|Y
01|191925|8|1|TOTAL OF 8 HOURS OF INSTALLATION & TRAINING|Y
01|191926|7|1|PRE-GAUGE-C8|Y
01|191926|8|1|TOTAL OF 8 HOURS OF INSTALLATION & TRAINING|Y
01|191929|3|1|C6 SPINDLE FOR E68B|Y
01|191929|5|1|C8 SPINDLE FOR E68B|Y
01|191929|6|1|PRE-GAUGE-C8|Y
01|191929|7|1|ISO60 SPINDLE FOR E68B|Y
01|191929|8|1|ISO60 MASTER GAUGE|Y
01|191930|3|1|Order as Part #HSK100A-ER32S-100BN which is the solid|Y
01|191930|3|2|nut holder converted to a bearing nut holder.|Y
01|191930|3|3|Refer to drawings for dimensions|Y
01|191946|1|1|Base(Master)Jaw Set for Howa H037M6 (LYN HW-06-HS)|Y
01|191946|1|2|1set /3pc|Y
01|191958|1|1|Items are non returnable non-cancelable speicials|Y
01|191958|1|2|Net price includes the following parts for assembly|Y
01|191958|1|3|at Lyndex-Nikken: HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|191958|1|4|customer's supplied RFID chip and holder re-balanced.|Y
01|191958|3|1|HS coolant nut installed included in price of holder|Y
01|191958|4|1|Coolant back-up screw and coolant tube installed|Y
01|191958|6|1|Items are considered non cancelablenon returnable|Y
01|191958|6|2|Net price includes the following parts for assembly|Y
01|191958|6|3|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|191958|6|4|customer's supplied RFID chip and holder re-balanced.|Y
01|191958|7|1|Customer providing balluf chip to be installed on|Y
01|191958|7|2|holder and balanced included in price of toolholder|Y
01|191958|8|1|HS coolant nut installed included in price of holder|Y
01|191958|9|1|Coolant back-up screw and coolant tube installed|Y
01|191958|9|2|included in price of toolholder|Y
01|191958|11|1|Items are non-cancelablenon-returnable specials|Y
01|191958|11|2|Net price includes the following parts for assembly|Y
01|191958|11|3|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|191958|11|4|customer's supplied RFID chip and holder rebalanced|Y
01|191958|12|1|Customer providing balluf chip to be installed on|Y
01|191958|12|2|holder and balanced included in price of toolholder|Y
01|191958|13|1|HS coolant nut installed included in price of holder|Y
01|191958|14|1|Coolant back-up screw and coolant tube installed|Y
01|191958|14|2|included in the price of the holder|Y
01|191960|4|1|NC4001-0750-6.00CP|Y
01|191960|4|2|NCAT40 Dual Contact Shell Mill Holder 3/4 6 proj|Y
01|191960|6|1|NC4001-1000-6.00CP|Y
01|191960|6|2|NCAT40 Dual Contact Shell Mill Holder 1 6 proj|Y
01|191960|29|1|NCAT40-SF6-160CP|Y
01|191960|31|1|NCAT40-SF8-130CP|Y
01|191960|32|1|NCAT40-SF8-160CP|Y
01|191960|35|1|NCAT40-SF10-160CP|Y
01|191960|37|1|NCAT40-SF12-130CP|Y
01|191960|38|1|NCAT40-SF12-160CP|Y
01|191960|40|1|NCAT40-SF14-130CP|Y
01|191960|41|1|NCAT40-SF14-160CP|Y
01|191960|54|1|NC4007-0040-5.00G|Y
01|191960|60|1|NC4006-0500-6.00CP|Y
01|191960|60|2|**MOQ: 10pcs|Y
01|191960|62|1|NC4006-0625-4.00CP|Y
01|191960|62|2|**MOQ: 10pcs|Y
01|191960|63|1|NC4006-0625-6.00CP|Y
01|191960|63|2|**MOQ: 10pcs|Y
01|191960|65|1|NC4006-0750-4.00CP|Y
01|191960|65|2|**MOQ: 10pcs|Y
01|191960|66|1|NC4006-0750-6.00CP|Y
01|191960|66|2|**MOQ: 10pcs|Y
01|191960|80|1|Mazak Standard Coolant Through Pull Stud|Y
01|191967|1|1|P/N: OKA05-12000|Y
01|191967|2|1|P/N: OKA05-13000|Y
01|191967|3|1|P/N:  TBD|Y
01|191969|1|1|Nikken ZKG16-14D(DIN376) One Touch Tap Collet|Y
01|191969|1|2|Tap Shank 11mm X Tap Drive Square 9mm|Y
01|191971|1|1|OKEX-CAP4X-ICE Okuma Static C4 X-Axis STRT<Side>BMT60|Y
01|191971|1|2|ICE >> Mimatic #198884|Y
01|191971|2|1|OKEX-CAP4Z-ICE Okuma Static C4 Z-Axis 90Deg<Face>BMT60|Y
01|191971|2|2|ICE|Y
01|191982|39|1|SK16-1/4AC|Y
01|191998|1|1|Option 1: Anti-Vibration SK Collet Chuck|Y
01|191998|5|1|Option 2: Nikken Milling Chuck (On-Size)|Y
01|192001|3|1|1.25 thick baseplate made to fit DN Solutions DNM 5700|Y
01|192001|3|2|Dowel pins will locate plate into t-slots of table.|Y
01|192001|3|3|Mounting holes and keyways for a Nikken CNC260PLFA-M|Y
01|192001|3|4|Rotary Table Stallion 9/35DBS & TS400PNU Tail Support.|Y
01|192001|4|1|Stallion trunnion double sided table with 9 x 35|Y
01|192001|4|2|working surface. Guaranteed flat within .001 per 35|Y
01|192001|4|3|2 grid pattern with 1/2-13 tapped holes and .501 ID|Y
01|192001|4|4|bushings included.|Y
01|192003|3|1|Includes Wrench|Y
01|192003|11|1|Includes Wrench|Y
01|192003|13|1|Includes Wrench|Y
01|192005|1|1|installation 5AX-201WAA21 on Mazak510|Y
01|192005|1|2|M-Code installation|Y
01|192019|1|1|IT40-SMS22-120|Y
01|192019|2|1|179817|Y
01|192019|2|2|Holder PolySAW/DeepMill|Y
01|192019|2|3|Size 25 shell mill FD 22|Y
01|192019|3|1|164439|Y
01|192019|3|2|PolySAW PS-G 80/25 Tinamatic-3|Y
01|192019|3|3|O80 z=40 A1.5 d1=38.2 depth.-max= 20.9|Y
01|192025|1|1|**Draw nut supplied w/out thread - Threading is|Y
01|192025|1|2|available for an additional fee**|Y
01|192025|2|1|**Draw nut supplied w/out thread - Threading is|Y
01|192025|2|2|available for an additional fee**|Y
01|192030|1|1|Net ea price|Y
01|192031|1|1|NET ea price. Special non cancelablenor returnable|Y
01|192031|3|1|NET ea price. Special non cancelablenor returnable|Y
01|192039|1|1|Modify customer's existing C4006-14-3.00 with|Y
01|192039|1|2|coolant ports.|Y
01|192039|1|3|$125.00ea/net per holder|Y
01|192041|1|1|RGA#TOR-59187/|Y
01|192041|1|2|Repair of PF-2|Y
01|192041|2|1|Calibration service included.|Y
01|192042|4|1|We currently have 9 in stock.  I will update you with|Y
01|192042|4|2|the expected delivery date of the remaining 11.|Y
01|192044|1|1|This item is discontinued we have one left.|Y
01|192044|1|2|It cannot be returned.|Y
01|192047|1|1|RGA#TAR-59218|Y
01|192047|1|2|SN#1250|Y
01|192050|11|1|Alternative for C5007-0020-6.00|Y
01|192050|13|1|Alternative to C5007-0025-6.00|Y
01|192057|3|1|Includes: Dual Axis Drive Short Bar Fiber Optic Cable|Y
01|192057|3|2|Communications Cable Bulk Head Cables Ext Cables|Y
01|192057|3|3|Parameter Changes Service Time & Travel|Y
01|192057|3|5|Sheet Metal Modifications MAY BE Required|Y
01|192061|1|1|RGA#TAR-59163|Y
01|192061|1|2|CNCB450FA SN:1061|Y
01|192066|4|1|Part # C5007-0016-4.12DIN-M|Y
01|192066|4|2|This item cannot be cancelled and cannot be returned.|Y
01|192082|1|1|e11045A02|Y
01|192082|1|2|C5 conversion adapter|Y
01|192082|1|3|Pricing reflects minimum Qty of 20. If Qty is less|Y
01|192082|1|4|submit for re-quote.|Y
01|192082|2|1|e11045A02|Y
01|192082|2|2|C5 conversion adapter|Y
01|192082|2|3|Pricing reflects Qty of 30 or more.|Y
01|192091|3|1|Includes 6th axis interface with Fanuc control Fanuc|Y
01|192091|3|2|servo amplifier to match servo motor in Rotary Table|Y
01|192091|3|3|Cabling and cable management system. Cables will hang|Y
01|192091|3|4|from an extention arm mounted on top of column or the|Y
01|192091|3|5|ceiling of the machine enclosure. Complete installation|Y
01|192091|3|6|parts time and travel. Installation will be 5-7 days.|Y
01|192091|4|1|Air freight varies $4-$6 per lb RT is aprox 5000 lbs|Y
01|192091|4|2|Air Freight for 4.5 month delivery is $20K-30K pending|Y
01|192091|4|3|current rates at time of shipment.|Y
01|192107|1|1|VDI40 C4  part# 196995|Y
01|192107|1|2|TBD - MZQT47-CAP4X-R-OFF-ICE|Y
01|192114|11|1|replaces SKN-10BJ|Y
01|192117|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|192117|4|1|Special price used table never put into prodcution.|Y
01|192124|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|192125|1|1|TABLE PART NUMBER WILL BE 5AX-2MT-182-250-205BMA-M|Y
01|192125|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|192126|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|192132|1|1|T00433 - OD Turning Holder|Y
01|192132|2|1|T00435 - OD Turning Holder|Y
01|192132|3|1|T03043 - Face & ID Holder|Y
01|192132|4|1|T10235 - Bare Bar Holder 2.5 Dia with Slit|Y
01|192132|5|1|T10204 - Bore Bar Holder 2.5 Dia (80mm High)|Y
01|192141|1|1|will cover UPS Red for wrong pull stud suggested|Y
01|192162|2|1|Replaces TQW-150|Y
01|192182|1|1|part# MZQT5-OD12X|Y
01|192182|1|2|Mazak Static X-Axis Ver Str OD1.1/4in|Y
01|192182|1|3|with 2 coolant nozzles|Y
01|192182|1|4|Mazak Mega 900|Y
01|192201|1|1|RGA#CUR-59173/|Y
01|192201|1|2|Repair of C50-MRAM s/n:75366 04 (Mimatic#162732)|Y
01|192201|2|1|Bearings seals and o-rings to be replaced.|Y
01|192204|3|1|NET ea price no additional discount|Y
01|192204|3|2|ETA based on receipt of dimensions|Y
01|192206|3|1|This is a test tool per Tim Reeves|Y
01|192206|3|2|This tool is on the Takisawa|N
01|192206|8|1|In stock in Japan.  1 to 2 weeks delivery.|Y
01|192206|11|1|In stock in Japan.  1 to 2 weeks delivery.|Y
01|192209|2|1|Option: 2|Y
01|192209|3|1|Draw-Bar info must be supplied for Modification|Y
01|192214|1|1|LVR-59223/|Y
01|192214|1|2|Repair of MNL12-ER25X-OFF-HS-ICE s/n:19904476 03|Y
01|192214|1|3|(Mimatic#189424)|Y
01|192214|2|1|Bearings seals and o-rings to be replaced.|Y
01|192219|1|1|ref. Mimatic# 124268|Y
01|192219|2|1|ref. Mimatic# 124887|Y
01|192229|2|1|**NET CHARGE to SST|Y
01|192249|1|1|RGA#LVR-59246/|Y
01|192249|1|2|Repair of MZMP47-ER32Z-C s/n:33675 01 (Mimatic#124864)|Y
01|192249|2|1|Bearings seals o-rings and damaged input spindle to|Y
01|192249|2|2|be replaced. Suggest to repalce with new version - very|Y
01|192249|2|3|old tool.|Y
01|192256|1|1|Z-15G55 is a discontinued item.|Y
01|192261|13|1|12 Chuck Soft Jaws|Y
01|192267|1|1|RGA#LVR-59224/|Y
01|192267|1|2|Repair of MZQT47-ER32Z s/n:18900478 05 (Mimatic#124635)|Y
01|192267|2|1|Bearings seals o-rings and damaged input spindle to|Y
01|192267|2|2|be replaced.|Y
01|192279|1|1|Delivery: 42 currently in stock/20 ETA to L-N Mid April|Y
01|192279|1|2|31 ETA to L-N 4 Weeks/Remaining Balance 16 Weeks ARO|Y
01|192284|4|1|The will not be available until April|Y
01|192291|1|1|Final Assembly: CAT40-RAC70-180E|Y
01|192291|1|2|Combination of CAT40-Q34-95U + 34-RAC70-85E|Y
01|192291|3|1|Final Assembly: CAT40-ZMAC70-165V|Y
01|192291|3|2|Combination of CAT40-Q34-95U + 34-ZMAC70-70V|Y
01|192298|2|1|PB-50-KURAKI - Positioning Block for Kuraki VMC|Y
01|192304|1|1|1st batch/DC(No IDU req'd for future PO.)|Y
01|192315|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|192319|5|1|(2) HOLDERS AVAILABLE IN 3-5 DAYS; 10 IN 2 WEEKS|Y
01|192324|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|192326|1|1|WITH ALPHA 2 MOTOR INSTALLED|Y
01|192326|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|192335|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|192336|2|1|Heidenhain Scale +/-3 Arc seconds with mounting kit|Y
01|192336|4|1|Installation price for two installations at same time.|Y
01|192338|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|192363|1|1|Replaces SKN-6WB|Y
01|192363|2|1|Replaces SKN-6WBJ|Y
01|192373|1|1|ETA WEEK OF 3/20 FOR REMAINING PIECES|Y
01|192380|1|1|CNC202LFA with RT-CN180SD-6+1-L(Rotary joint)|Y
01|192380|1|2|KS-CN180L-FA206(Direct mount cover)|Y
01|192380|1|3|TCE-A7026(Power cable) and TCE-94808(Feedback cable)|Y
01|192380|1|4|Non-cancelable Non-returnable ARO|Y
01|192381|1|1|RGA#LVR-59234/|Y
01|192381|1|2|Repair of MNL12-SK20Z-ICE-10K s/n:18900810 08|Y
01|192381|1|3|(Mimatic#184650)|Y
01|192381|2|1|Bearings seals and o-rings to be replaced.|Y
01|192388|1|1|INSTALLATION CNC180MA ON MAXMILL|Y
01|192388|1|2|NOT INCLUDING: AMPLIFIER EXTERNAL CABLE SET|Y
01|192402|3|1|TG50 series is discontinued and no longer available|Y
01|192402|3|2|quoted TG75 as an option.|Y
01|192405|1|1|Base(Master)Jaw Set for Howa H037M6 (LYN HW-06-HS)|Y
01|192405|1|2|1set = 3 jaws|Y
01|192421|1|1|RGA#LVR-59250/|Y
01|192421|1|2|Repair of OKU-L370MW-DB s/n: n/a (Alps#OK109-15001)|Y
01|192421|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|192421|2|2|replaced. If the spindle can be reused the cost will|Y
01|192421|2|3|be $3180.40|Y
01|192425|1|1|PO#10 102771  MAZAK LIVE Shank VDI50 similar DIN ISO|Y
01|192425|1|2|10889(DIN69880) Antrieb 2-tang-drive SW=12mm;tooling|Y
01|192425|1|3|interface for HSK63A;ext over coolant pipe;output dir|Y
01|192425|1|4|is reversal to input;central offset A=75mm;L1=118.5mm;|Y
01|192425|1|5|gear ratio=1:1;max coolant pressure 70 bar(1015psi);|Y
01|192425|1|6|Max tourque M(max)=100Nm;Max rev=6500rpm|Y
01|192425|4|1|PO#40 102771  MAZAK LIVE Shank VDI50 similar DIN ISO|Y
01|192425|4|2|10889 (DIN 69880) Antrieb 2-tang-drive SW=12 mm;tooling|Y
01|192425|4|3|interface forHSK63A;central coolant supply thru spindle|Y
01|192425|4|4|&external over coolant pipe;output dir is reversal to|Y
01|192425|4|5|input;Ll = 160 mm;gear ratio: 1:1;max. coolant pressure|Y
01|192425|4|6|70 bar (1015PSI);max torque M(max)=100 Nm;|Y
01|192425|4|7|max rev 6500rpm|Y
01|192432|1|1|RGA#LVR-59256/|Y
01|192432|1|2|Repair of MZQT47-ER16-AD-HS s/n:86828 01|Y
01|192432|1|3|(Mimatic#125054)|Y
01|192432|2|1|Bearings seals o-rings and damaged bevel gears to be|Y
01|192432|2|2|replaced.|Y
01|192436|30|1|Items Added to quote 02/09/2023|Y
01|192451|1|1|AA21N-CTRL-SP|Y
01|192451|1|2|EMPA-N10800E|Y
01|192460|16|1|OKLT- Driven X-Axis C3 live head|Y
01|192460|16|2|Part Number to be determined.|Y
01|192460|17|1|OKLT- Driven Z-Axis C2 live head|Y
01|192460|17|2|Part Number to be determined.|Y
01|192468|7|1|TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|192474|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|192517|1|1|Order as part #NB50F1-2500-3.00 dual contact|Y
01|192517|1|2|Customer must sign approvaldrawing prior to manufacture|Y
01|192517|1|3|Special item considered non-cancelablenon-returnable|Y
01|192517|1|4|once ordered.|Y
01|192522|1|1|CNCZ105FA-M|Y
01|192522|1|2|SN:3050F|Y
01|192522|1|3|RGA#TAR-59259|Y
01|192528|1|1|Add SKN-16B(GH) and re-balance HSK63A-SK16C-150|Y
01|192528|1|2|Quoted at NET price.|Y
01|192540|1|1|BMT65-ER25-AD-ICE|Y
01|192540|1|2|BMT65 Live ER25 Adjustable  ICE|Y
01|192540|1|3|Machine: Haas DS30Y|Y
01|192557|1|1|LYN part# MZQT47-C4Z-ICE|Y
01|192557|1|2|Ref. Drawing# 196997|Y
01|192557|1|3|Mazak Live CAPTO/ POLYGON C4; Z-Axis 90-Degree|Y
01|192557|1|4|H-Type|Y
01|192557|1|5|IntExtCoolant 7MP|Y
01|192558|1|1|With Standard flange assembly with positioning pin|Y
01|192558|2|1|With Standard flange assembly with positioning pin|Y
01|192558|3|1|With Standard flange assembly with positioning pin|Y
01|192563|1|1|500pcs purchased and shipped all in one release.|Y
01|192563|3|1|500pcs purchased in 2 shipments of 250pcs each.|Y
01|192563|3|2|PO must reflects the 500pcs and guaranteed purchase of|Y
01|192563|3|3|all but in 2 releases with time noted.|Y
01|192565|3|1|THIS SPINDLE CAN BE USED FOR HSK40E ALSO.|Y
01|192565|7|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|192575|1|1|Sigma 5 Motor with T-Slot Faceplate|Y
01|192578|1|1|1 set(3 pcs) of Key for H3EF8|Y
01|192585|1|1|INCLUDES T SLOT FACE PLATE|Y
01|192585|2|1|EXTERNAL POWER AND FEED BACK CABLES|Y
01|192586|3|1|(1) ADAPTER PLATE FOR HAINBUCH HYDROK SE 40 CHUCK|Y
01|192588|2|1|EXTERNAL POWER AND FEED BACK CABLE SET|Y
01|192590|1|1|Order Part # C5007-0032-12.00DIN-M|Y
01|192590|1|2|CAT50 ER32 Collet Chuck HighTorque Bearing Nut DIN Cool|Y
01|192595|1|1|TABLE HAS BUILT IN ROTARY JOINT ON BOTH SPINDLES|Y
01|192595|2|1|(2) ADAPTER PLATES FOR HAINBUCH HYDROK SE 40 CHUCKS|Y
01|192605|1|1|ZKG24-16-50L|Y
01|192605|1|2|ZKG24 TorqueControl Tap Collet|Y
01|192638|1|1|HSK100A-FMC27-50|Y
01|192640|9|1|Machine info for Draw Screw must be provided|Y
01|192642|3|1|match E346V+|Y
01|192642|6|1|our sales team will help setup provide training|Y
01|192644|1|1|Face Value $35000.00|Y
01|192644|1|2|Partial Tax $1168.23|Y
01|192658|4|1|Installation includes: Dual axis drive short bar|Y
01|192658|4|2|fiber optic cable communications cables bulkhead|Y
01|192658|4|3|cables external cables parameter changes service|Y
01|192658|4|4|time and travel.|Y
01|192663|1|1|These are due 3/31|Y
01|192663|7|1|This is an alternative to B3007-011-2.00|Y
01|192664|1|1|These are due 3/31|Y
01|192664|7|1|This is an alternative to B3007-011-2.00|Y
01|192672|1|1|NBT30-MDMS3S-105|Y
01|192672|1|2|NBT30 Dual Contact Shrink Fit Holder 3mm|Y
01|192672|1|3|Major Dream 25000rpm|Y
01|192672|2|1|NBT30-MDMS4R-105|Y
01|192672|2|2|NBT30 Dual Contact Shrink Fit Holder 6mm|Y
01|192672|2|3|Major Dream 25000rpm|Y
01|192688|1|1|BT-IN>WH1|Y
01|192688|2|1|BT-IN>WH1|Y
01|192688|3|1|BT-IN>WH1|Y
01|192688|4|1|BT-IN>WH1|Y
01|192701|1|1|RGA#TOR-59277/|Y
01|192701|1|2|Repair of PF-2|Y
01|192701|5|1|Calibration service included.|Y
01|192706|1|1|MCM4T-32 >> Morse Taper MT4 32mm Milling Chuck|Y
01|192718|1|1|RGA#LVR-59656/|Y
01|192718|1|2|Repair of MNZ20-SK16X-ICE-12K s/n:20905017 02|Y
01|192718|1|3|(Mimatic#193568)|Y
01|192718|2|1|Bearings seals o-rings and damaged SK16 spindle to be|Y
01|192718|2|2|replaced.|Y
01|192718|4|1|RGA#LVR-59656/|Y
01|192718|4|2|Repair of MNZ20-SK16X-ICE-12K s/n:20905017 19|Y
01|192718|4|3|(Mimatic#193568)|Y
01|192718|5|1|Bearings seals and o-rings to be replaced.|Y
01|192719|1|1|Bombardier Part #GC000651 must be added to lable on|Y
01|192719|1|2|box. The part number will not fit on the collet.|Y
01|192724|1|1|same as previous SN#1788 our SO#890186|Y
01|192724|1|2|same your previous PO#11054887W|Y
01|192724|1|3|6+1 RJ included|Y
01|192724|1|4|quoted as Net price|Y
01|192724|1|5|inland freight not included (Lyndex to TMMWA)|Y
01|192742|1|1|V-Ex Box Set >> V-EX In-Cut Waste Extraction|Y
01|192742|1|2|Quoted at NET price.|Y
01|192742|1|3|Part Number To Be Determined.|Y
01|192742|8|1|#V-EX-Cradle >> holds V-EX body.|Y
01|192742|8|2|Quoted at Net Price|Y
01|192742|8|3|Part Number to Be Determined|Y
01|192744|9|1|Must be installed at Lyndex-Nikken.|Y
01|192750|4|1|NC4001-0750-6.00CP|Y
01|192750|4|2|NCAT40 Dual Contact Shell Mill Holder 3/4 6 proj|Y
01|192750|6|1|NC4001-1000-6.00CP|Y
01|192750|6|2|NCAT40 Dual Contact Shell Mill Holder 1 6 proj|Y
01|192750|29|1|NCAT40-SF6-160CP|Y
01|192750|31|1|NCAT40-SF8-130CP|Y
01|192750|32|1|NCAT40-SF8-160CP|Y
01|192750|35|1|NCAT40-SF10-160CP|Y
01|192750|37|1|NCAT40-SF12-130CP|Y
01|192750|38|1|NCAT40-SF12-160CP|Y
01|192750|40|1|NCAT40-SF14-130CP|Y
01|192750|41|1|NCAT40-SF14-160CP|Y
01|192750|54|1|NC4007-0040-5.00G|Y
01|192750|60|1|NC4006-0500-6.00CP|Y
01|192750|60|2|**MOQ: 10pcs|Y
01|192750|62|1|NC4006-0625-4.00CP|Y
01|192750|62|2|**MOQ: 10pcs|Y
01|192750|63|1|NC4006-0625-6.00CP|Y
01|192750|63|2|**MOQ: 10pcs|Y
01|192750|65|1|NC4006-0750-4.00CP|Y
01|192750|65|2|**MOQ: 10pcs|Y
01|192750|66|1|NC4006-0750-6.00CP|Y
01|192750|66|2|**MOQ: 10pcs|Y
01|192750|80|1|Mazak Standard Coolant Through Pull Stud|Y
01|192764|3|1|Quoted at NET price.|Y
01|192778|1|1|RGA#TAR-59273|Y
01|192778|1|2|TABLE ONLY CORE TRADE IN|Y
01|192791|1|1|Quoted as Net Price|Y
01|192791|2|1|This Hydraulic Unit is optional|Y
01|192791|2|2|Quoted as Net price|Y
01|192795|7|1|ISO45 SPINDLE|Y
01|192795|8|1|ISO45 MASTER GAUGE|Y
01|192798|4|1|SK25 ID 1.0 inch size Coolant thru collet|Y
01|192802|2|1|Bombardier Part # GC000571|Y
01|192817|1|1|EXTERNAL COOLANT ONLY|Y
01|192817|2|1|INTERNAL OR EXTERNAL COOLANT|Y
01|192818|16|1|Net price|Y
01|192825|1|1|P/N: ISO30-SK16-70|Y
01|192834|7|1|**THIS ITEM IS NON-RETURNABLE|Y
01|192834|21|1|**THIS ITEM IS NON-RETURNABLE|Y
01|192834|22|1|**THIS ITEM IS NON-RETURNABLE|Y
01|192834|23|1|**THIS ITEM IS NON-RETURNABLE|Y
01|192849|1|1|RGA#TAR-59171|Y
01|192849|1|2|CNC204LFA  SN:1017|Y
01|192849|3|1|PS61-25-4MGZ-AFL18-IP-FS20BARR|Y
01|192849|32|1|V-130L|Y
01|192849|33|1|AS568-032|Y
01|192849|34|1|AS568-131|Y
01|192865|1|1|NBT50-C42-105|Y
01|192865|1|2|NBT50 Dual Contact 42mm Milling Chuck|Y
01|192865|1|3|**Special - cannot be returned or cancelled|Y
01|192865|1|4|**Quoted at NET Price|Y
01|192868|1|1|HSK100A-2000A-5.00|Y
01|192872|4|1|NO ID THREADS|Y
01|192873|1|1|Mimatic#197827 LN part #TBA Okuma Live ER32 90Deg VDI40|Y
01|192873|1|2|INT/EXT coolant.1:2 GEAR MAX 20Nm;MAX INPUT 5000 RPM;|Y
01|192873|1|3|MAX OUTPUT 10K RPM;Must order wrenches|Y
01|192873|1|4|Item is at net each price with no additional discount|Y
01|192873|1|5|This is a Non standard stock special item that will not|Y
01|192873|1|6|be cancelablenor returnable once ordered|Y
01|192875|5|1|Quoted at Net pricing|Y
01|192875|5|2|Info must be supplied for modification|Y
01|192877|2|1|4-PCS ETA to L-N 04/20 >>4-PCS ETA to L-N 05-20|Y
01|192881|3|1|Items above are current part #s|Y
01|192894|1|1|One time special discount.Item is non returnable|Y
01|192895|1|1|P/N: IT30-SK16-70|Y
01|192911|6|1|Delivery is 1 week after spindle verification|Y
01|192911|6|2|Positioning Block for Okuma 500MU|Y
01|192913|1|1|Please Note: Discount reflects a purchase order of|Y
01|192913|1|2|3 tools. If quantities change please contact  L-N|Y
01|192913|1|3|for a re-quote.|Y
01|192918|1|1|1st Batch *1/31:DWG Saved in Eng. File|Y
01|192918|2|1|1st Batch *1/31:DWG Saved in Eng. File|Y
01|192918|3|1|1st Batch *1/31:DWG Saved in Eng. File|Y
01|192918|4|1|1st Batch *1/31:DWG Saved in Eng. File|Y
01|192918|5|1|1st Batch *1/31:DWG Saved in Eng. File|Y
01|192918|6|1|1st Batch *1/31:DWG Saved in Eng. File|Y
01|192918|7|1|1st Batch *1/31:DWG Saved in Eng. File|Y
01|192918|8|1|1st Batch *1/31:DWG Saved in Eng. File|Y
01|192918|9|1|1st Batch *DWG Saved in Eng. File|Y
01|192918|10|1|1st Batch *DWG Saved in Eng. File|Y
01|192918|11|1|1st Batch *DWG Saved in Eng. File|Y
01|192918|12|1|1st Batch *DWG?|Y
01|192918|13|1|1st Batch *DWG?|Y
01|192918|14|1|1st Batch/DWG Saved in Eng. File.|Y
01|192918|15|1|1st Batch/DWG Saved in Eng. File.|Y
01|192918|16|1|1st Batch/929634 10/20:DWG Approved/Customer|Y
01|192925|1|1|JPY492800($1=129.00) No Nut No Wrench|Y
01|192925|2|1|JPY323830($1=129.00) No Nut No Wrench|Y
01|192925|3|1|JPY271100($1=129.00) No Nut No Wrench|Y
01|192925|4|1|JPY243400($1=129.00) No Nut No Wrench|Y
01|192931|1|1|RGA#LVR-59283/|Y
01|192931|1|2|Repair of MNL12-CAPTO5Z s/n:A0003 (Alps#MSA01-8B000)|Y
01|192931|2|1|Bearings o-rings and spindle to be replaced. If the|Y
01|192931|2|2|spindle can be reused the cost will be $2344.40|Y
01|192936|3|1|Replaces discontinued W15S5-1375-6.55|Y
01|192941|1|2|L = 225 mm / L1 = 76 mm; angular head 360 adjustable|Y
01|192944|1|1|5AX-201OSP4-M-AB|Y
01|192944|1|2|SN:5554|Y
01|192958|1|1|Mimatic #202226/ Drawing #00042279|Y
01|192958|1|2|Shaft HSK 63 according DIN69893-A complete with Torque|Y
01|192958|1|3|Arm  per and locking mechanism without machine|Y
01|192958|1|4|specific stop-block. A = 66 + 4 mm / taper pin 14mm|Y
01|192958|1|5|tooling interface for collet system ER 25|Y
01|192958|1|6|(Diameter 20 - 160 mm) according to DIN 6499|Y
01|192958|1|7|central coolant supply through spindle and external|Y
01|192958|1|8|coolant over coolant nozzles/pipe.|Y
01|192958|1|9|Input is not reversal to output.|Y
01|192958|1|10|L = 18696 mm  O025mm angular head 3600 adjustable|Y
01|192960|1|1|2 pieces STOCK 1 piece 3wks 1 piece 5-7wks|Y
01|192972|1|1|Cannot cancel cannot return.|Y
01|192972|4|1|Cannot cancel cannot return.|Y
01|192972|5|1|Cannot cancel cannot return.|Y
01|192972|9|1|Cannot cancel cannot return.|Y
01|192972|10|1|Cannot cancel cannot return.|Y
01|192972|12|1|Part # HSK100A-CZF20-115|Y
01|192980|1|1|Delivery to be 3-5 days after design is completed.|Y
01|192980|1|2|To be used on a DMC125|Y
01|192981|1|1|Full set has 1 item 800-042 which is back ordered with|Y
01|192981|1|2|no solide delivery date. Best to order individual pcs|Y
01|192981|1|3|as shown below|Y
01|193000|3|1|quoted as an in stock alternative.|Y
01|193018|1|1|1st Batch T/P Inspection Required/11/12 DWG apprvedMFG|Y
01|193021|1|1|Qty 9 = $256 net each|Y
01|193021|1|2|Qty 12 = $233 net each|Y
01|193026|2|1|Customer to advise taper needed.  Default is CAT40.|Y
01|193026|3|1|SPECIAL PROMO - With purchase of Start2 SF Machine|Y
01|193026|3|2|customer will recieve a $1000.00 List Price Tooling|Y
01|193026|3|3|Credit good for standard shrink fit holders under 6|Y
01|193026|3|4|projection. (This is per Chris Blaine to help customer)|Y
01|193026|4|1|These come with the Shrink Fit Machine Package|Y
01|193026|14|1|Optional stand|Y
01|193026|15|1|Installation and Training Fee Waived by Chris Blaine|Y
01|193026|15|2|as he will perform installation and training at no|Y
01|193026|15|3|charge as a Thank You for customer.|Y
01|193041|2|1|1ea on hand.Item is discontinued with no replacement|Y
01|193041|3|1|1ea on hand.Item is discontinued with no replacement|Y
01|193043|4|1|Delivery = 1 week after spindle verification|Y
01|193049|1|1|Replacemaent cover for 5AX-130BASABR2 R650X2|Y
01|193049|1|2|Machine serial #JPN122829|Y
01|193064|1|1|RGA#LVR-59266/|Y
01|193064|1|2|Repair of T32005 s/n:A0381|Y
01|193064|2|1|Bearings collet nut spindle and drive shaft to be|Y
01|193064|2|2|replaced.|Y
01|193079|1|1|Req.INS/T/P Inspection RequiredMFGInstockUPD2/1>>5/B B|Y
01|193079|2|1|Req.INS/T/P Inspection RequiredMFGInstockUPD2/1>>5/B B|Y
01|193079|3|1|Req.INS/T/P Inspection RequiredMFG20wks(3/15)>2/28#1UP|Y
01|193079|4|1|Req.INS/T/P Inspection Required5/B B|Y
01|193081|1|1|1st Batch *DWG saved in Eng. File.|Y
01|193081|2|1|1st Batch *DWG saved in Eng. fileMFG12/1>1/30#2UPD1/16|Y
01|193081|3|1|1st Batch DWG saved in Eng. file.(30)MFG12/B (30>60)MF|Y
01|193082|2|1|POSITIONING BLOCK FOR RIGHT ANGLE HEAD|Y
01|193082|2|2|WILL NEED A SPINDLE FACE DRAWING OR WILL NEED TO|Y
01|193082|2|3|COME VISIT TO MEASURE THE SPINDLE FACE MYSELF.|Y
01|193096|8|1|Hoses with fitting|Y
01|193098|1|1|LYN part# BT50-FMC22-60|Y
01|193098|1|2|BT50 Shell/Face Mill Holder 22mm pilot w/ 60mm|Y
01|193098|1|3|projection|Y
01|193134|1|1|USED Only 1 unit available.|Y
01|193134|5|1|Yas Saeki will be setting up and training E236N at Kito|Y
01|193136|4|1|Include Hand Labor and HardwarePrice for 2 Install|Y
01|193157|3|1|Using Existing drive unit|Y
01|193165|3|1|Installation includes: Dual axis drive short bar|Y
01|193165|3|2|fiber optic cables communications cables bulkhead|Y
01|193165|3|3|cables external cables parameter changes service|Y
01|193165|3|4|time and travel. Installation to take approx 2-days|Y
01|193177|1|1|replaces C40S6-1250|Y
01|193198|1|1|1st Batch *1/31:DWG Saved in Eng. File|Y
01|193198|2|1|1st Batch *1/31:DWG Saved in Eng. File|Y
01|193198|3|1|1st Batch/933992 12/2:DWG APPRVD/EU Treske|Y
01|193198|4|1|1st Batch/933992 12/2:DWG APPRVD/EU Treske|Y
01|193200|8|1|FOR 9/64 DIAMETER|Y
01|193202|2|1|This is a net charge for Lyndex Nikken to thread the|Y
01|193202|2|2|blank draw nut to match the customers machine drawtube.|Y
01|193202|2|3|Customer will need to provide supplied form even if|Y
01|193202|2|4|they chose to thread the draw nut themselves as LYN|Y
01|193202|2|5|needs that info to verify if the chuck will fit the|Y
01|193202|2|6|machine as is or will need a different draw nut adapter|Y
01|193206|10|1|NBT30-SF3-90|Y
01|193206|11|1|NBT30-SF4-90|Y
01|193219|1|1|Includes Haas Motors and Cables|Y
01|193219|1|2|Sigma 1 Control|Y
01|193230|2|1|MODIFICATION CHARGE CONVERT RIGHTY TABLE OFF SHELF|Y
01|193230|2|2|TO CUSTOMERS SA-BR3 SPEC RH|Y
01|193240|7|1|Replaces SKN-6BJ(GH)|Y
01|193240|9|1|added to match the 4.5m collett|Y
01|193242|3|1|Heidenhain Scale + Mounting Kit + wiring|Y
01|193242|4|1|NT50 Taper Center Socket with Manual Draw Bolt|Y
01|193242|5|1|External Cable Set - Length TBD|Y
01|193245|7|1|Required wrench for NBT30-SK10C-45P holder above|Y
01|193245|9|1|Required wrench for NBT30-SK16C-60P holder above|Y
01|193245|28|1|S700XD1|Y
01|193262|1|1|IT50-C25-105|Y
01|193262|1|2|if no stock at time of order leadtime is 3 months aro|Y
01|193262|2|1|IT50-C25-135|Y
01|193262|2|2|lead time may change if order is delayed|Y
01|193262|3|1|IT50-C25-165|Y
01|193270|7|1|Wrench for MBT40-C20-70|Y
01|193270|8|1|Wrench for NBT40-C20-70G|Y
01|193270|9|1|Wrench for NBT40-SK16C-75|Y
01|193277|2|1|NBT40-MDSK20-75|Y
01|193277|2|2|NBT40 Dual Contact SK20 Major Dream 15000rpm|Y
01|193290|2|1|Please Note: This item is non standard stock. Once|Y
01|193290|2|2|a purchase order is placed it cannot be cancelled|Y
01|193290|2|3|or returned.|Y
01|193297|2|1|SUPPORT TABLE WITH AIR BRAKE|Y
01|193297|3|1|SUPPORT TABLE WITH NO BRAKE|Y
01|193299|2|1|Replaces C40-STD(B)|Y
01|193299|2|2|Same as C40-STD(B) except this has 4mm through hole|Y
01|193312|2|1|NBT40-MDSK20-75|Y
01|193312|2|2|NBT40 Dual Contact SK20 Major Dream 15000rpm|Y
01|193314|14|1|Please allow 3 to 4 weeks for delivery|Y
01|193326|9|1|Quoted at NET price.|Y
01|193332|1|1|INCLUDES ROTARY TABLE WITH FANUC ALPHA ii MOTOR|Y
01|193332|1|2|ALSO INCLUDES EXTERNAL POWER/FEEDBACK CABLES|Y
01|193332|2|1|SUPPORT TABLE (NO BRAKE) FOR TRUNNION ASSEMBLY|Y
01|193332|3|1|***PLACEHOLDER FOR 6/13 TRUNNION TABLE***|Y
01|193332|5|1|30MM RISER TO MATCH ROTARY & SUPPORT TABLE HEIGHTS|Y
01|193332|6|1|THIS COST WOULD BE FOR FULL INSTALLATION. PRICE WILL|Y
01|193332|6|2|LIKELY BE LESS SINCE THE MACHINES ALREADY HAVE|Y
01|193332|6|3|ROTARY TABLES INSTALLED. WE WILL BE ABLE TO USE|Y
01|193332|6|4|EXISTING AMPLIFIERS. WE WILL NEED ELECTRICAL DIAGRAMS|Y
01|193332|6|5|TO CALCULATE EXACT COST OF INSTALL PER MACHINE.|Y
01|193336|4|1|Also 9/64|Y
01|193336|5|1|Also 11/64|Y
01|193336|6|1|Also 15/64|Y
01|193336|11|1|25/64|Y
01|193347|3|1|ER16/ER20 EQUIVALENT|Y
01|193347|5|1|FOR 1/16 DIAMETER|Y
01|193347|6|1|for 3/32 DIAMETER|Y
01|193347|8|1|FOR 9/64 DIAMETER|Y
01|193347|11|1|FOR 9/32 DIAMETER|Y
01|193360|1|1|3 pcs stock in Jpn ETA 1-2wks ARO|Y
01|193360|1|2|2 pcs 8wks Mfg plus 2wks ship|Y
01|193365|1|1|Delivery is 15-16 weeks after reciept of signed|Y
01|193365|1|2|approval drawing.|Y
01|193366|1|1|Table + cable only|Y
01|193375|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|193380|1|1|Need Re-Box/Re-Label for 941239|Y
01|193380|1|2|Base(CAT40-Q34-95U)+Head(34-RAC70-85E)|Y
01|193380|2|1|Need Re-Box/Re-Label for 941239|Y
01|193380|2|2|Base(CAT40-Q34-95U)+Head(34-ZMAC70-70V)|N
01|193387|1|1|Part # BMT55-ER25-AD-HS2-ICE >> Mimatic PT# 202259|Y
01|193387|1|2|Shank for BMT- style turret with D = 55mm S=104mm|Y
01|193387|1|3|tooling interface for collet system ER25 (0.5-16.0mm)|Y
01|193387|1|4|according DIN 6499 internal coolant through the spindle|Y
01|193387|1|5|and external coolant over pipes grade of filtration:|Y
01|193387|1|6|max. 005mm Continuous dryrun possible with  sufficient|Y
01|193387|1|7|cooling phase max. temperature of 900C(1940F)must not|Y
01|193387|1|8|be exceeded. No reversal of rotation/Drive direction|Y
01|193387|1|9|equal output direction.L=134MM/Gear Ration 1:2 Max|Y
01|193387|1|10|input 6000RPM: Max output 12K RPM/.|Y
01|193403|2|1|NET|Y
01|193421|1|1|Country of Origin: Taiwan|Y
01|193421|2|1|Country of Origin: Taiwan|Y
01|193421|3|1|Country of Origin: Taiwan|Y
01|193421|4|1|Country of Origin: Taiwan|Y
01|193421|5|1|Country of Origin: Taiwan|Y
01|193421|6|1|Country of Origin: Taiwan|Y
01|193421|7|1|Country of Origin: Taiwan|Y
01|193421|8|1|Country of Origin: Taiwan|Y
01|193421|9|1|Country of Origin: Taiwan|Y
01|193421|10|1|Country of Origin: Taiwan|Y
01|193421|11|1|Country of Origin: Taiwan|Y
01|193421|12|1|Country of Origin: Taiwan|Y
01|193421|13|1|Country of origin: Taiwan|Y
01|193421|14|1|Country of origin: Taiwan|Y
01|193421|15|1|Country of Origin: Japan|Y
01|193423|17|1|This size is considered special once ordered it cannot|Y
01|193423|17|2|be cancelled or returned.|Y
01|193423|19|1|This item no longer comes in dual contact. We can only|Y
01|193423|19|2|offer standard CAT50|Y
01|193423|22|1|This item is discontinued but we have a few left.|Y
01|193423|22|2|These are non-returnable.|Y
01|193427|17|1|This size is considered special once ordered it cannot|Y
01|193427|17|2|be cancelled or returned.|Y
01|193427|19|1|This item no longer comes in dual contact. We can only|Y
01|193427|19|2|offer standard CAT50|Y
01|193427|22|1|This item is discontinued but we have a few left.|Y
01|193427|22|2|These are non-returnable.|Y
01|193432|1|1|5AXZ-350FA-RU1-RJ6 SN: 3973|Y
01|193432|1|3|CUSTOMER HAD CRASH/OVERLOAD ON TILTING AXIS|Y
01|193453|1|1|JPY247000/ea($1=JPY130.00)|Y
01|193467|1|1|s/n.13941  Special Face Plate  w/o  Direct mount Cable|Y
01|193467|1|2|with A06B-2235-B000 Fanuc AC Servo Motor A8iS A4000I|Y
01|193488|1|1|BT30-ZDS12-105|Y
01|193488|1|2|Dream Synchro Tap Holder|Y
01|193488|1|3|No cancellable no returnable|Y
01|193488|2|1|OZMK12-4-OM|Y
01|193488|2|2|Rigid tap holder collet coolant for M4|Y
01|193488|2|3|No cancellable no returnable|Y
01|193488|3|1|OZMK12-5-OM|Y
01|193488|3|2|Rigid tap holder collet coolant for M5|Y
01|193488|3|3|No cancellable no returnable|Y
01|193488|4|1|OZMK12-6-OM|Y
01|193488|4|2|Rigid tap holder collet coolant for M6|Y
01|193488|4|3|No cancellable no returnable|Y
01|193488|5|1|OZMK12-8-OM|Y
01|193488|5|2|Rigid tap holder collet coolant for M8|Y
01|193488|5|3|No cancellable no returnable|Y
01|193491|2|1|Net each price. Our sevice dept will obtain proper|Y
01|193491|2|2|dimension from the end user|Y
01|193492|1|1|Discount based on entire quantity ordered.|Y
01|193492|1|2|Note: This order is non-cancellable/Non-returnable.|Y
01|193497|1|1|1st Batch/Screw on Key|Y
01|193497|2|1|Req.INS:Need to check dual contact tolerance.|Y
01|193509|1|1|9 pieces in stock|Y
01|193511|23|1|Item is non-standard stock can not be cancelled or|Y
01|193511|23|2|returned|Y
01|193528|2|1|One time special price|Y
01|193532|1|1|7585-4322-012523|Y
01|193538|1|1|Req.INS until tolerance issue gets resolved|Y
01|193538|2|1|Req.INS until tolerance issue gets resolved|Y
01|193538|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|193538|4|1|Req.INS:Need to check dual contact tolerance.|Y
01|193538|5|1|Req.INS:Need to check dual contact tolerance.|Y
01|193538|6|1|Req.INS:Need to check dual contact tolerance.|Y
01|193538|7|1|Req.INS:Need to check dual contact tolerance.|Y
01|193538|8|1|Req.INS:Need to check dual contact tolerance.|Y
01|193538|9|1|Req.INS:Need to check dual contact tolerance.|Y
01|193565|8|1|FOR .07 GARR DRILL|Y
01|193569|1|1|Replaces old part #C5011-0750-4.00|Y
01|193583|1|1|Replaces DC part # C5017-0032-6.00|Y
01|193596|3|1|Installation includes: Drive unitshort barfiber optic|Y
01|193596|3|2|cable communications cable bulkhead cables external|Y
01|193596|3|3|cables parameter changes service time and travel.|Y
01|193601|8|1|FOR .07 GARR DRILL|Y
01|193656|5|1|Adapter plate for workholding platfrom.|Y
01|193656|5|2|Vero S or ZPS|Y
01|193671|11|1|**once stock is depleted part# will be discontinued|Y
01|193691|1|1|Above insert is discontinued ALT P/N: 6MP-C4(T1500Z)|Y
01|193691|1|2|1 set = 10 pieces|Y
01|193691|2|1|P/N: BT50-RAC32-225K|Y
01|193691|4|1|P/N: BT50-RAC53-270E|Y
01|193691|5|1|P/N: BT50-RAC70-315E|Y
01|193691|6|1|P/N: BT50-RAC100-325E|Y
01|193691|9|1|P/N: BT50-ZMAC55-270V|Y
01|193691|10|1|P/N: BT50-ZMAC70-300V|Y
01|193691|11|1|P/N: BT50-ZMC100-325V|Y
01|193691|12|1|P/N: CC12-C8(AC410K) 1 set = 10 pieces|Y
01|193691|13|1|P/N: SC09-C4(AC410K) 1 set = 10 pieces|Y
01|193691|23|1|P/N: SP34-34-60|Y
01|193694|8|1|Brandon said he would do the install himself at no|Y
01|193694|8|2|charge|Y
01|193705|1|1|Non cancelable non returnable|Y
01|193705|2|1|Non cancelable non returnable|Y
01|193705|3|1|Non cancelable non returnable|Y
01|193705|4|1|Non cancelable non returnable|Y
01|193716|12|1|This item is discontinued. We have 2 left.|Y
01|193716|12|2|This is non-returnable.|Y
01|193731|1|1|5AX-201FA-M SN: 5518|Y
01|193731|1|2|TAR-59190|Y
01|193731|49|1|New External Cable Set|Y
01|193731|49|2|Fanuc|Y
01|193749|13|1|SKJ6-1|Y
01|193756|1|1|TAR-59297|Y
01|193756|1|2|CNCZ180LSA-BR2/S1000X1|Y
01|193760|2|1|Asked Melinda to double check if they are trying to use|Y
01|193760|2|2|this collet with the 3/4 holder-will not work|Y
01|193768|1|1|**Net Price|Y
01|193778|1|1|Replaces discontinued part#B30S5-062-2.40|Y
01|193779|1|1|ng.|N
01|193815|1|1|1st Batch/929323 MSC/Textron 11/1:DWG Approved/Customer|Y
01|193823|1|1|Item is non-standard stock and can not be|Y
01|193823|1|2|cancelled or returned.|Y
01|193824|2|1|Quoted at Net pricing|Y
01|193824|2|2|Info must be supplied for modification|Y
01|193834|12|1|This item is discontinued. We have 2 left.|Y
01|193834|12|2|This is non-returnable.|Y
01|193851|1|1|Two pots of your choice come with this unit.|Y
01|193851|2|1|Two pots of your choice come with this unit.|Y
01|193853|1|1|part# C4007-0016-6.00DIN-M|Y
01|193853|1|2|CAT40 ER16 Collet Chuck w/ 6 Gage Length|Y
01|193853|1|3|Modified DIN Coolant Through the flange|Y
01|193853|1|4|*Net price|Y
01|193861|1|1|H100A-SF1000-1.5 or 2|Y
01|193869|1|1|*net price|Y
01|193876|4|1|Includes: Drive unit short bar fiber optic cables|Y
01|193876|4|2|communications cable bulkhead cables external cables|Y
01|193876|4|3|parameter changesservice time and travel.|Y
01|193891|1|1|Includes cables|Y
01|193891|5|1|Free $1500.00 Tooling Promotion|Y
01|193893|6|1|Wrench for the SK10 holder above|Y
01|193893|9|1|Drawing attached to verify dimensions are correct|Y
01|193900|2|1|These do not have IdChipHole|Y
01|193906|1|1|CNC250FA-M TAR-59304|Y
01|193906|1|2|N29734R K182547MVL|Y
01|193907|10|1|SHINJI HAS A KIT WE SHOULD BE ABLE TO BORROW|Y
01|193907|15|1|PLEASE TAKE FROM W2|Y
01|193907|16|1|PLEASE TAKE FROM W2|Y
01|193907|17|1|PLEASE TAKE FROM W2|Y
01|193915|1|1|TAR-59294|Y
01|193915|1|2|5AX-201MA-M SN: 5649|Y
01|193915|1|3|TILT AXIS CRASH NEED TO REPLACE WORM WHEEL AND SCREW|Y
01|193915|1|4|AS WELL AS BEARINGS/SEALS O-RINGS ON TILT AXIS|Y
01|193917|13|1|Wrench for BT30-SK20-90|Y
01|193917|14|1|wrench for NBT30-SK16C-60|Y
01|193917|15|1|wrench for NBT30-SK10C-60|Y
01|193934|2|1|TCE-A3043/TCE-94200 Cable set|Y
01|193934|3|1|CNC180-2W-250FA repair cost at the worst senario|Y
01|193934|5|1|CNC180LFA match s/n.15972 W/O groove and extra work|Y
01|193934|6|1|TCE-A3016/4 Direct mount power cable|Y
01|193934|7|1|TCE-94828/1 Direct mount feedback table|Y
01|193934|8|1|CNC180LFA repair cost at the worst senario|Y
01|193934|10|1|CNC202-2W-250FA repair cost at the worst senario|Y
01|193934|11|1|Modified Keyways for Hitachi Astemo GA|Y
01|193936|30|1|Items Added to quote 02/09/2023|Y
01|193945|1|1|T/P Inspection Required|Y
01|193949|30|1|Items Added to quote 02/09/2023|Y
01|193966|1|1|HSK63T-180-TH25R-115|Y
01|193966|2|1|HSK63T-90-TH25N-80|Y
01|193971|1|1|CNC205AR21-RU77|Y
01|193971|1|2|AX21 RU77 Scale Subplate Color: White RS232C option|Y
01|193971|1|3|Special Model for Mitutoyo|Y
01|193971|2|1|CNC180LAR21-RU77|Y
01|193971|2|2|AR21 RU77 Scale Color: White RS232C option|Y
01|193971|2|3|Special Model for Mitutoyo|Y
01|193971|3|1|Color: White|Y
01|193971|5|1|PLC with Expedited Service. For FORM Measuring Machine.|Y
01|193971|9|1|Air Freight Cost for CNC180LAR21-RU77 & TAT-170N|Y
01|193977|1|1|P/N BMT65-ER25-AD-ICE - BMT65 ER25 Adjustable Angle|Y
01|193977|1|2|Live Tool Internal & External Coolant.|Y
01|193981|1|1|CNCZ105LAR21-RU77|Y
01|193981|1|2|AR21 RU77 Scale Color: White RS232C option|Y
01|193981|1|3|Special Model for Mitutoyo|Y
01|193981|2|1|Color: White|Y
01|193984|7|1|**No Jet Slot Cap in this Size**|Y
01|193984|8|1|**No Jet Slot Cap in this Size**|Y
01|193984|24|1|**No Jet Slot Cap in this Size**|Y
01|193984|46|1|**No Jet Slot Cap in this Size**|Y
01|193984|47|1|**No Jet Slot Cap in this Size**|Y
01|193984|48|1|**No Jet Slot Cap in this Size**|Y
01|193988|2|1|NBT50-SK6C-105|Y
01|193988|2|2|NBT50 DualContact Slim Chuck SK6 Coolant 15000rpm|Y
01|193988|3|1|NBT50-MMC8C-105-AA|Y
01|193988|3|2|NBT50 DualContact Mini Chuck 8mm Coolant 30000rpm G2.5|Y
01|193988|4|1|NBT50-SK10C-105|Y
01|193988|4|2|NBT50 DualContact Slim Chuck SK10 Coolant 15000rpm|Y
01|193988|5|1|NBT50-SK13C-105|Y
01|193988|5|2|NBT50 DualContact Slim Chuck SK13 Coolant 15000rpm|Y
01|193988|6|1|NBT50-SK16C-105|Y
01|193988|6|2|NBT50 DualContact Slim Chuck SK16 Coolant 15000rpm|Y
01|193988|7|1|NBT50-SK20C-105|Y
01|193988|7|2|NBT50 DualContact Slim Chuck SK20 Coolant 15000rpm|Y
01|193990|1|1|LYN NCAT50-KIT|Y
01|193992|2|1|Heidenhain Scale + Mounting Kit + Wiring|Y
01|193992|5|1|Installation on either DNM or SVM series|Y
01|193992|5|2|with Fanuc Oi-MF Control|Y
01|193992|5|3|Machine will need Scale Detector Unit if not already|Y
01|193992|5|4|installed.|Y
01|193993|1|1|H80F-SF0375-5.00B Hsk80F 3/8 Shrink Balancable w/mpin|Y
01|193993|1|2|6 pcs = $538 net ea.|Y
01|193993|1|3|9 pcs = $413 net ea.|Y
01|193995|1|1|If RTP orders 2 5AX-201's the discount will increase to|Y
01|193995|1|2|40% or $32460 each. Please pass this discount to RTP|Y
01|193995|2|1|Haas to have the machines 5 Axis ready.|Y
01|193995|2|2|Lyndex to install table provide cables and air lines|Y
01|193995|2|3|and change the parameters|Y
01|193997|1|1|Non-standard stock cannot be cancelled or returned.|Y
01|193997|3|1|Non-standard stock cannot be cancelled or returned.|Y
01|194006|8|1|ref. old part# C4017-0011|Y
01|194006|9|1|ref. old part# C4007-0025|Y
01|194016|1|1|RGA#TOR-59356/|Y
01|194016|1|2|Repair of NCAT40-C1-85U-IDU|Y
01|194019|15|1|Same spanner as 100TG-SPAN|Y
01|194024|2|1|*NET price|Y
01|194024|2|2|LYN to thread blank draw nut to match customer's|Y
01|194024|2|3|machine drawtube.|Y
01|194024|2|4|Delivery is 2-3 days upon receipt specs from customer.|Y
01|194027|2|1|Replaces part #VMK8-1/8JB|Y
01|194029|2|1|Includes 2 pcs. of CAT40 Holder Pots P/N SF-POT-#40|Y
01|194080|8|1|OKUMA CONNECTION APP|Y
01|194090|1|1|MZST68-ER25X-OFF-C|Y
01|194090|1|2|MIM#177631   Drawing#40849|Y
01|194090|1|3|MAZAK LIVE BMT68 ER25; STRAIGHT OFFSET;|Y
01|194090|1|4|OFFSET V=62.5mm; INT/EXT COOLANT - NO DRY RUN;|Y
01|194090|1|5|1:1.5 GEAR; MAX IN 7000RPM; MAX OUT 10500RPM;|Y
01|194090|1|6|REF DRWG # 00040849|Y
01|194090|1|7|MACHINE INFO: QTS200M|Y
01|194090|1|8|SPECIAL ORDER ITEM NON_CANCELABLE AND NON_-RETURNABLE|Y
01|194090|1|9|AFTER RECEIPT OF PO|Y
01|194090|1|10|ETA 2-3 WEEKS  ARO (1PC IN STOCK OVERSEAS)|Y
01|194090|2|1|MZST68-ER32X-OFF-C|Y
01|194090|2|2|Straight Offset ER32 Mazak live tool|Y
01|194095|1|1|RGA#TOR-59353/|Y
01|194095|1|2|Repair of PF-2|Y
01|194095|2|1|Calibration service included.|Y
01|194117|1|1|T1|Y
01|194117|3|1|T3|Y
01|194117|4|1|T3|Y
01|194117|5|1|T4|Y
01|194117|6|1|T4|Y
01|194117|7|1|T5|Y
01|194117|8|1|T5|Y
01|194117|9|1|T6|Y
01|194117|10|1|T6|Y
01|194117|11|1|T7|Y
01|194117|12|1|T9|Y
01|194117|13|1|T9|Y
01|194117|14|1|T10|Y
01|194117|15|1|T11|Y
01|194117|16|1|T12|Y
01|194117|17|1|T12|Y
01|194117|18|1|T13|Y
01|194117|19|1|T13|Y
01|194117|20|1|T14|Y
01|194117|21|1|T14|Y
01|194117|22|1|T15|Y
01|194117|23|1|T15|Y
01|194117|24|1|T16|Y
01|194117|25|1|T17|Y
01|194117|26|1|T17|Y
01|194117|27|1|T18|Y
01|194117|28|1|T18|Y
01|194117|29|1|T19|Y
01|194117|30|1|T19|Y
01|194117|31|1|T20|Y
01|194117|32|1|T20|Y
01|194117|33|1|T21|Y
01|194117|34|1|T21|Y
01|194117|35|1|T22|Y
01|194117|36|1|T22|Y
01|194117|37|1|T23|Y
01|194117|39|1|T25|Y
01|194117|40|1|T25|Y
01|194117|41|1|T26|Y
01|194117|42|1|T27|Y
01|194117|43|1|T27|Y
01|194117|44|1|T28|Y
01|194117|45|1|T28|Y
01|194117|46|1|T29|Y
01|194117|47|1|T29|Y
01|194117|48|1|T30|Y
01|194117|49|1|T30|Y
01|194117|50|1|T31|Y
01|194117|52|1|T32|Y
01|194117|53|1|T33|Y
01|194117|54|1|T34|Y
01|194117|55|1|T34|Y
01|194117|56|1|T35|Y
01|194117|57|1|T35|Y
01|194117|58|1|T36|Y
01|194117|59|1|T36|Y
01|194117|60|1|T37|Y
01|194117|61|1|T37|Y
01|194117|62|1|T38|Y
01|194117|63|1|T38|Y
01|194117|64|1|T39|Y
01|194117|65|1|T39|Y
01|194117|66|1|T40|Y
01|194117|67|1|T40|Y
01|194117|68|1|T41|Y
01|194117|69|1|T41|Y
01|194117|70|1|T42|Y
01|194117|71|1|T42|Y
01|194117|72|1|T43|Y
01|194117|73|1|T43|Y
01|194117|74|1|T44|Y
01|194117|75|1|T44|Y
01|194117|76|1|T45|Y
01|194117|77|1|T45|Y
01|194117|78|1|T46|Y
01|194117|79|1|T46|Y
01|194117|80|1|T47|Y
01|194117|81|1|T47|Y
01|194117|82|1|T48|Y
01|194117|83|1|T48|Y
01|194117|84|1|T49|Y
01|194117|85|1|T49|Y
01|194117|86|1|T50|Y
01|194117|87|1|T50|Y
01|194117|88|1|T51|Y
01|194117|89|1|T51|Y
01|194117|90|1|T52|Y
01|194117|91|1|T52|Y
01|194117|92|1|T53|Y
01|194117|93|1|T53|Y
01|194117|94|1|T54|Y
01|194117|95|1|T54|Y
01|194117|96|1|T55|Y
01|194117|97|1|T55|Y
01|194117|98|1|T56|Y
01|194117|99|1|T56|Y
01|194117|100|1|T57|Y
01|194117|101|1|T57|Y
01|194117|102|1|T58|Y
01|194117|103|1|T58|Y
01|194117|104|1|T46 - 1/4-28 TAP OPERATION|Y
01|194117|105|1|T46 - 1/4-28 TAP OPERATION|Y
01|194117|106|1|T40 - 1/4-28 TAP OPERATION|Y
01|194117|107|1|T36 - 5/16-18 TAP OPERATION|Y
01|194117|108|1|T36 - 5/16-18 TAP OPERATION|Y
01|194117|109|1|T36 - 5/16-18 TAP OPERATION|Y
01|194117|110|1|T30 - 5/16-18 TAP OPERATION|Y
01|194117|111|1|T30 - 5/16-18 TAP OPERATION|Y
01|194117|112|1|T44 - 7/16-14 TAP OPERATION|Y
01|194117|113|1|T44 - 7/16-14 TAP OPERATION|Y
01|194117|114|1|T45 - 7/16-14 TAP OPERATION|Y
01|194117|115|1|T45 - 7/16-14 TAP OPERATION|Y
01|194117|116|1|T6 - 9/16-18 TAP OPERATION|Y
01|194117|117|1|T6 - 9/16-18 TAP OPERATION|Y
01|194117|118|1|T9 - 9/16-18 TAP OPERATION|Y
01|194117|119|1|T9 - 9/16-18 TAP OPERATION|Y
01|194117|120|1|T31 - 9/16-18 TAP OPERATION|Y
01|194117|121|1|T31 - 9/16-18 TAP OPERATION|Y
01|194117|122|1|T39 - 9/16-18 TAP OPERATION|Y
01|194117|123|1|T39 - 9/16-18 TAP OPERATION|Y
01|194147|1|1|Quoted at Net Price|Y
01|194167|1|1|BT30-ZDS12-105|Y
01|194167|1|2|Dream Synchro Tap Holder|Y
01|194167|1|3|No cancellable no returnable|Y
01|194167|2|1|NBT30-ZDS12-105|Y
01|194167|2|2|Dream Synchro Tap Holder|Y
01|194167|2|3|No cancellable no returnable|Y
01|194167|3|1|OZMK12-4-OM|Y
01|194167|3|2|Rigid tap holder collet coolant for M4|Y
01|194167|3|3|No cancellable no returnable|Y
01|194167|4|1|OZMK12-5-OM|Y
01|194167|4|2|Rigid tap holder collet coolant for M5|Y
01|194167|4|3|No cancellable no returnable|Y
01|194167|5|1|OZMK12-6-OM|Y
01|194167|5|2|Rigid tap holder collet coolant for M6|Y
01|194167|5|3|No cancellable no returnable|Y
01|194167|6|1|OZMK12-8-OM|Y
01|194167|6|2|Rigid tap holder collet coolant for M8|Y
01|194167|6|3|No cancellable no returnable|Y
01|194179|2|1|quoted at list|Y
01|194180|1|1|STANDARD BT30 W/ STANDARD NUT; GOOD TO 15K RPM|Y
01|194180|3|1|STANDARD BT30 W/ STANDARD NUT; GOOD TO 15K RPM|Y
01|194180|14|1|STANDARD SK6 NUT|Y
01|194186|1|1|Currency in USD|Y
01|194186|1|2|For HAAS VF-4SS SN#1194280|Y
01|194197|1|1|Conversion parts to adapt to new machine if required.|Y
01|194209|2|1|Draw-tube 85mm max OD|Y
01|194221|1|1|Includes Haas Motors and Cables.|Y
01|194226|1|1|Relable Box with part #GC000650.|Y
01|194232|1|1|CERTIFICATE WILL PURCHASE APPROXIMATELY 60 BIG PLUS|Y
01|194232|1|2|CAT50 TOOL HOLDERS.|Y
01|194236|1|1|CERTIFICATE WILL PURCHASE APPROXIMATELY 60 BIG PLUS|Y
01|194236|1|2|BT40 TOOL HOLDERS.|Y
01|194238|1|1|CNCZ302FA-HS10+1RJ  Ref.S#7583|Y
01|194238|1|2|w/o motor  motor cover and  direct mount cable|Y
01|194238|1|3|This table is for Horkos machine. The customer is|Y
01|194238|1|4|responsible for the work replacing the table.|Y
01|194292|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|194293|1|1|Motors configured to work with DNM Fanuc Platform|Y
01|194293|2|1|Hydraulic tank and pump - Set up for table brakes only.|Y
01|194293|3|1|During the table installation Lyndex Nikken will also|Y
01|194293|3|2|plumb an airline from the machine source to the built|Y
01|194293|3|3|in rotary union of the 5AX-350 table.  There will also|Y
01|194293|3|4|be a solenoid valve on the air line that will be wired|Y
01|194293|3|5|in to a spare M Code of the machine control. Customer|Y
01|194293|3|6|to supply SCHUNK Vero S receiver to connect to air line|Y
01|194293|3|7|Customer to also hook up SCHUNK system to the rotary|Y
01|194293|3|8|union port of the table.  Lyndex Nikken is responsible|Y
01|194293|3|9|for everything from the machine to the table RJ and|Y
01|194293|3|10|customer is responsible for hooking up SCHUNK receiver.|Y
01|194296|1|1|BIS-C-122-04/L  ID Chip - BALLUFF BIS0011|Y
01|194296|1|2|10mm in diameter and 4.5mm thick User date read/write|Y
01|194296|1|3|installed.|Y
01|194296|1|4|Bombardier # AV000102|Y
01|194296|2|1|L-N part # CAT50-C1.1/4-135U-IDI|Y
01|194296|2|2|CAT50 Milling Chuck 1-1/4 Id Chip Installed 6000 RPM|Y
01|194296|2|3|BIS-C-122-04/L  ID Chip - BALLUFF BIS0011|Y
01|194296|2|4|10mm in diameter and 4.5mm thick User date read/write|Y
01|194296|2|5|installed|Y
01|194296|2|6|Bombardier # AV000103|Y
01|194296|3|1|CAT50-SZF6-165U-IDI|Y
01|194296|3|2|CAT50 Bulls Eye Zero Fit Slim Chuck SK6 10000rpm|Y
01|194296|3|3|With BIS-C-122-04/L ID Chip - BALLUFF BIS0011|Y
01|194296|3|4|10mm in diameter and 4.5mm thick User date read/write|Y
01|194296|3|5|installed.|Y
01|194296|3|6|Bombardier # AV000128|Y
01|194296|6|1|Quoted at NET price.|Y
01|194304|1|1|Includes Haas Motors and Cables.|Y
01|194328|1|1|** CORE TRADE IN DISCOUNT 1 TIME SPECIAL OFFER **|Y
01|194328|1|2|NEW TABLE EXCEPT: MOTOR AND EXTERNAL CABLE|Y
01|194328|2|1|ESTIMATE ON LABOR FOR SERVICE CALL TO SWAP|Y
01|194328|2|2|MON 3/6 & TUESD 3/7|Y
01|194358|1|1|Ref.Birla AIR#222370211|Y
01|194358|1|2|No INS Req'd. BT back to Wh1 after OB Rcpt.|Y
01|194361|1|1|CAT50U-AF1-30-OH|Y
01|194361|1|2|CAT50 back spot facing tool - MAIN BODY|Y
01|194361|1|3|Pricing for 1 to 3 pieces|Y
01|194361|1|4|NON-CANCELABLE & NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|194361|1|5|NET PRICING QUOTED NO FURTHER DISCOUNTS|Y
01|194361|2|1|BF130-20.5-38.1-28.7C|Y
01|194361|2|2|Required Arbor|Y
01|194361|2|3|pricing for 1 to 3 pieces|Y
01|194361|2|4|NON-CANCELABLE & NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|194361|2|5|NET PRICING QUOTED NO FURTHER DISCOUNTS|Y
01|194361|3|1|9BF130-20.5-38.1-28.7C-W|Y
01|194361|3|2|Required Byte|Y
01|194361|3|3|MOQ 5 pcs|Y
01|194361|3|4|NON-CANCELABLE & NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|194361|3|5|NET PRICING QUOTED NO FURTHER DISCOUNTS|Y
01|194364|1|1|MZST68-ER25X-OFF-C|Y
01|194364|1|2|MIM#177631   Drawing#40849|Y
01|194364|1|3|MAZAK LIVE BMT68 ER25; STRAIGHT OFFSET;|Y
01|194364|1|4|OFFSET V=62.5mm; INT/EXT COOLANT - NO DRY RUN;|Y
01|194364|1|5|1:1.5 GEAR; MAX IN 7000RPM; MAX OUT 10500RPM;|Y
01|194364|1|6|REF DRWG # 00040849|Y
01|194364|1|7|MACHINE INFO: QTS200M|Y
01|194364|1|8|SPECIAL ORDER ITEM NON_CANCELABLE AND NON_-RETURNABLE|Y
01|194364|1|9|AFTER RECEIPT OF PO|Y
01|194364|1|10|ETA 2-3 WEEKS  ARO (1PC IN STOCK OVERSEAS)|Y
01|194364|3|1|Ref#177631 But in ER32|Y
01|194364|3|2|MAZAK LIVE BMT68 ER32;STRAIGHT OFFSET;OFFSET V=62.5mm|Y
01|194364|3|3|INT/EXT COOLANT - ICE IF POSSIBLE;1:1.5 GEAR;MAX IN|Y
01|194364|3|4|7000RPM;MAX OUT 10500RPM; Info from MFG:|Y
01|194364|3|5|recommend the tool with ER25 with ER32 the is extended|Y
01|194364|3|6|by approx.25mm. This can result in too high a bearing|Y
01|194364|3|7|load during milling|Y
01|194386|1|1|(.1575-.1378)|Y
01|194418|1|1|Installed with PS-123E at the factory|Y
01|194418|2|1|Installed on NC5-46-SK20C-90 at the factory|Y
01|194420|2|1|HSK100A-C32-300 HSK100A Milling Chuck 32mm 2400rpm|Y
01|194420|6|1|HSK100A-1000-8.00 HSK100A End Mill Holder 1 IdChipHole|Y
01|194423|1|1|Non returnable.|Y
01|194423|3|1|Non Returnable|Y
01|194432|1|1|with 6+1 RJ Built In|Y
01|194432|2|1|6M direct mount cable set|Y
01|194434|2|1|HSK50E-SK6-60P|Y
01|194434|2|2|HSK50E Slim Chuck SK6 Coolant High Speed 30000rpm G2.5|Y
01|194442|1|1|CNC205AR21-RU77|Y
01|194442|1|2|AX21 RU77 Scale Subplate Color: White RS232C option|Y
01|194442|1|3|Special Model for Mitutoyo|Y
01|194442|2|1|CNC180LAR21-RU77|Y
01|194442|2|2|AR21 RU77 Scale Color: White RS232C option|Y
01|194442|2|3|Special Model for Mitutoyo|Y
01|194442|3|1|Color: White|Y
01|194442|5|1|PLC for FORM measuring machines.|Y
01|194442|9|1|Air Freight Cost for CNC180LAR21-RU77 & TAT-170N|Y
01|194445|1|1|4.3307 GAUGE LENGTH|Y
01|194445|2|1|5.5118 GAUGE LENGTH|Y
01|194445|3|1|2.3622 GAUGE LENGTH|Y
01|194460|1|1|P/N 5AX-1200BZA-M - Includes 1FK7101-2AF71-1RG1 Motors.|Y
01|194461|28|1|*Corresponding coolant disc for CCK1.1/4-16|Y
01|194461|30|1|*Corresponding coolant disc for CCK1.1/4-1|Y
01|194467|2|1|Customer can also make themselves.|Y
01|194472|1|1|Special price to match item ordered incorrectly on|Y
01|194472|1|2|PO 3336598001. RGA #59406 for the return of that item|Y
01|194479|1|1|RGA#TAR-59300|Y
01|194479|1|2|SN:3773|Y
01|194479|1|3|5AX-130|Y
01|194501|1|1|CC12-C4(AC410K) - pack of 10|Y
01|194501|2|1|CC07-C4(AC410K) - pack of 10|Y
01|194520|10|1|INCLUDES (2) 8 TOTAL HOUR DAY FOR TRAINING & INSTALL|Y
01|194524|2|1|SK version of MNL12-ER40X uses higher precision SK|Y
01|194524|2|2|collets.  Can be ran dry and 10000 rpm's|Y
01|194524|7|1|SK version of MNL12-ER32Z uses higher precision SK|Y
01|194524|7|2|collets.  Can be ran dry and 10000 rpm's|Y
01|194524|10|1|SK version of MNL12-ER32X uses higher precision SK|Y
01|194524|10|2|collets.  Can be ran dry and 10000 rpm's|Y
01|194524|12|1|6000 rpm's|Y
01|194524|13|1|10000 rpm's|Y
01|194524|15|1|6000 rpm's|Y
01|194524|16|1|10000 rpm's|Y
01|194525|11|1|INCLUDES (2) 8 TOTAL HOUR DAY FOR TRAINING & INSTALL|Y
01|194527|1|1|Discount reflects an order of 1~5 tools.|Y
01|194527|2|1|Discount reflects an order of 6~10 tools.|Y
01|194527|3|1|Discount reflects an order of 1~5 tools|Y
01|194527|4|1|Discount reflects an order of 6~10 tools.|Y
01|194527|5|1|Discount reflects an order of 1~5 tools|Y
01|194527|6|1|Discount reflects an order of 6~10 tools.|Y
01|194527|7|1|Discount reflects an order of 1~5 tools|Y
01|194527|8|1|Discount reflects an order of 6~10 tools.|Y
01|194527|9|1|Discount reflects an order of 1~5 tools|Y
01|194527|10|1|Discount reflects an order of 6~10 tools.|Y
01|194527|11|1|Discount reflects an order of 1~5 tools|Y
01|194527|12|1|Discount reflects an order of 6~10 tools.|Y
01|194527|13|1|Discount reflects an order of 1~5 tools|Y
01|194527|14|1|Discount reflects an order of 6~10 tools.|Y
01|194527|15|1|Discount reflects an order of 1~5 tools|Y
01|194527|16|1|Discount reflects an order of 6~10 tools.|Y
01|194527|17|1|Discount reflects an order of 1~5 tools|Y
01|194527|18|1|Discount reflects an order of 6~10 tools.|Y
01|194527|19|1|Discount reflects an order of 1~5 tools|Y
01|194527|20|1|Discount reflects an order of 6~10 tools.|Y
01|194527|22|1|Discount reflects an order of 1~5 tools|Y
01|194527|23|1|Discount reflects an order of 6~10 tools.|Y
01|194527|24|1|Discount reflects an order of 1~5 tools.|Y
01|194527|25|1|Discount reflects an order of 6~10 tools.|Y
01|194527|27|1|Discount reflects an order of 1~5 tools.|Y
01|194527|28|1|Discount reflects an order of 6~10 tools.|Y
01|194527|29|1|Discount reflects an order of 1~5 tools.|Y
01|194527|30|1|Discount reflects an order of 6~10 tools.|Y
01|194527|32|1|Discount reflects an order of 1~5 tools.|Y
01|194527|33|1|Discount reflects an order of 6~10 tools.|Y
01|194527|34|1|Discount reflects an order of 1~5 tools.|Y
01|194527|35|1|Discount reflects an order of 6~10 tools.|Y
01|194537|1|1|1st Batch/942217 Drillmex 3/3:DWG saved in Teams file|Y
01|194537|2|1|1st Batch DWG Saved in Teams File|Y
01|194537|3|1|1st Batch DWG Saved in Teams File|Y
01|194537|4|1|1st Batch *DWG Saved in Eng. File.|Y
01|194537|5|1|1st Batch *DWG Saved in Eng. File.|Y
01|194537|6|1|Req. INS/Install S5/8-18X1/2|Y
01|194537|7|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|194537|8|1|Req.INS/Install E16-NUT & ER16-SCREW(S)|Y
01|194537|9|1|1st Batch/(4)937118 2/23:DWG saved in Teams&Eng. file.|Y
01|194537|10|1|Req.INS/(6)931350 TJ Aero. *REPLACE NCR349-1|Y
01|194537|11|1|1st Batch/DWG Saved in Eng. File.|Y
01|194597|1|1|RGA#TOR-59354/|Y
01|194597|1|2|Repair of HSK100A-NPU13C-145-R|Y
01|194603|1|1|Replaces part# C5011-0750-4.00|Y
01|194608|1|1|1st Batch/INS Req'd|Y
01|194608|2|1|Req.INS until tolerance issue gets resolved.|Y
01|194608|3|1|Req.INS until tolerance issue gets resolved.|Y
01|194608|4|1|Req.INS:Need to check dual contact tolerance.|Y
01|194618|2|1|Only 2 in stock discontinued special|Y
01|194618|2|2|non-cancelable/non-returnable|Y
01|194618|3|1|SPECIAL non-cancelable/non-returnable|Y
01|194618|5|1|SPECIAL non-cancelable/nonreturnable|Y
01|194618|5|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|194624|1|1|Tooling promo does not apply.|Y
01|194624|3|1|Special promotion for MDI-CO buy 1-get one free|Y
01|194632|2|1|6 in stock|Y
01|194632|2|2|3 due in mid april|Y
01|194632|2|3|8 due in end of may|Y
01|194646|1|1|(200) Pieces to Ship UPS Ground|Y
01|194646|2|1|(40) Pieces to Ship UPS Next Day Saturday Delivery|Y
01|194647|1|1|**4pc MIN pricing|Y
01|194647|8|1|LYN to make position block. Delivery is 1 week from|Y
01|194647|8|2|receipt of PO upon receipt of spindle drawing specs|Y
01|194647|8|3|NET price|Y
01|194648|2|1|Wrench for the NBT40-SK6C-150P holder|Y
01|194648|7|1|In stock option to out of stock -150P|Y
01|194659|1|1|Hardinge #15930018000000 is a custom made collet to|Y
01|194659|1|2|.544 ID closest match we have is an emergency collet|Y
01|194659|1|3|that can be machined out to size.|Y
01|194661|1|1|RGA#TOR-59390/|Y
01|194661|1|2|Repair of PF-2|Y
01|194661|3|1|Installation of new stylus and calibration service|Y
01|194661|3|2|included.|Y
01|194679|1|1|Special offered discount to account for core trade in|Y
01|194679|1|2|of existing table that is currently in for repair.|Y
01|194679|1|3|Special pricing offered to replace instead of repair.|Y
01|194679|1|4|Pricing only valid for this offer and quote terms.|Y
01|194682|21|1|NBT50-FMH38.1-100-75|Y
01|194682|21|2|BT50 2Lock Shell Mill Holder 38.1mm Coolant Ports|Y
01|194682|30|1|Wrench for SK20|Y
01|194682|31|1|Wrench for SK10|Y
01|194682|32|1|Wrench for C32 Milling Chuck|Y
01|194682|33|1|Wrench for ER32|Y
01|194694|3|1|Wrench for holder abover|Y
01|194698|3|1|Includes 16C Dead Length pneumatic closer and adapter|Y
01|194698|3|2|plate.|Y
01|194715|4|1|***|Y
01|194715|5|1|No coolant ports|Y
01|194715|7|1|No coolant ports|Y
01|194715|8|1|No coolant ports|Y
01|194745|1|1|NBT50-FMH32-96-90|Y
01|194745|1|2|BT50 2lock Shell Mill Holder 32mm Coolant Ports|Y
01|194765|1|1|1st batch/DC(No IDU req'd for future PO.)|Y
01|194765|2|1|1st batch/DC(No IDU req'd for future PO.)|Y
01|194780|1|1|NET Pass through charge for custom made adapter plate|Y
01|194780|1|2|for mounting Nikken 5AX-201 to Haas VF3SS machine bed.|Y
01|194780|1|3|Plate will be .750-1.0 thick and provide clearance hole|Y
01|194780|1|4|locations for mounting to machine as well as tapped|Y
01|194780|1|5|holes for rotary table toe clamping.  Will also have a|Y
01|194780|1|6|slip fit keyway slot to accept the rotary table keys|Y
01|194780|1|7|that provide alignment to the machine.|Y
01|194790|4|1|CAT50-Z12-130U CAT50 Tension/Compression Tap Holder #1|Y
01|194790|12|1|ZKG12-1/4S|Y
01|194790|12|2|#1 TorqueControl Tap Collet 6.3 X 5mm|Y
01|194790|13|1|ZKG12-5/16S|Y
01|194790|13|2|#1 TorqueControl Tap Collet 8 X 6.3mm|Y
01|194790|14|1|ZKG12-3/8S|Y
01|194790|14|2|#1 TorqueControl Tap Collet 10 X 8mm|Y
01|194790|15|1|ZKG12-7/16S|Y
01|194790|15|2|#1 TorqueControl Tap Collet 8 X 6.3mm|Y
01|194790|16|1|ZKG12-1/2S|Y
01|194790|16|2|#1 TorqueControl Tap Collet 9 X 7.1mm|Y
01|194795|1|1|additinal 5%discount for 20pcs+|Y
01|194795|2|1|Free wrench for 20pcs+|Y
01|194795|4|1|PTS standard discount price|Y
01|194809|2|1|Substitute for 100TG-SPAN|Y
01|194812|1|1|Solid Nut|Y
01|194830|2|1|replaces SKN-10BJ|Y
01|194835|3|1|Mount table connect external cable set set parameters|Y
01|194835|3|2|connect hydraulic unit and run hoses with quick|Y
01|194835|3|3|disconnects.|Y
01|194835|6|1|Hydraulic unit with hose and quick disconnects|Y
01|194842|1|1|Line 1 test|Y
01|194842|1|2|LINE 2 test NO|N
01|194842|1|3|LINE 3 test Yes|Y
01|194842|1|4|LINE 4 test Yes|Y
01|194842|4|1|LINE4 test|Y
01|194842|4|2|LINE4 test NO|N
01|194842|5|1|test 5 yes|Y
01|194842|5|2|test 5 no|N
01|194845|1|1|Package price that includes the table with OSP3 motors|Y
01|194845|1|2|per customer advisment and external cable set.|Y
01|194849|1|1|Qty 100-499|Y
01|194849|1|2|**QTY 500 --> drops to $77.00ea/net|Y
01|194862|1|1|LYN part# 09PFM|Y
01|194862|1|2|Elbo PFM Pulling Force Meter with #40/#50 Cone|Y
01|194862|1|3|NET Price|Y
01|194862|2|1|LYN part# 09FM035|Y
01|194862|2|2|Elbo PFM Cone Bushing for Pulling Force Meter #40|Y
01|194862|2|3|NET Price|Y
01|194872|1|1|Net each pricewith no additional discount|Y
01|194872|1|2|Once ordered this is non-cancelablenon-returnable|Y
01|194872|1|3|If ordered by 4/6ETA is mid April|Y
01|194890|2|1|part# TBD|Y
01|194890|2|2|Mazak LIVE 90-Degree Head Double ER25 Output on MAIN|Y
01|194890|2|3|Internal Coolant through the spindle and external|Y
01|194890|2|4|coolant over pipes|Y
01|194890|2|5|grade of filtration: max 005mm|Y
01|194890|2|6|reversal of rotation|Y
01|194890|2|7|(Drive direction unequal output direction)|Y
01|194890|2|8|L1 = 120mm|Y
01|194890|2|9|gear rato:  i(n1/n2)= 1:1|Y
01|194890|2|10|Max Coolant Pressure: 70bar/ 1015 PSI|Y
01|194890|7|1|cross from WTO 420532071-40|Y
01|194890|9|1|cross from WTO 420132030-40|Y
01|194896|1|1|replaces VMK8-1/8J|Y
01|194899|1|1|Includes Haas motor and cable set.|Y
01|194924|5|1|Part # C8-SM0750-4.00CP|Y
01|194924|6|1|part # C8-SM1000-4.00CP|Y
01|194924|7|1|Part# C8-SM1250-4.00CP|Y
01|194932|1|1|Balance of 1 pc ETA 6/28|Y
01|194935|1|1|Item is non-standard stock once a PO is received it|Y
01|194935|1|2|can not be cancelled or returned.|Y
01|194945|1|1|Req.INS/T/P Inspection RequiredBOAT|Y
01|194945|2|1|Req.INS/T/P Inspection RequiredBOAT|Y
01|194945|3|1|Req.INS/T/P Inspection RequiredBOAT|Y
01|194949|15|1|Modified Keyways for Hitachi Astemo GA|Y
01|194949|16|1|TCE-A3043/2 Direct mount power cable|Y
01|194949|17|1|TCE-94828/1 Direct mount feedback cable|Y
01|194952|1|1|This is a special cannot be cancelled or returned|Y
01|194952|5|1|This is a special cannot be cancelled or returned|Y
01|194974|1|1|BT30-SK16-60-J-IDI|Y
01|194974|6|1|SKG-12L-W6-J|Y
01|194976|7|1|BEARING NUT - BETTER RUN OUT/GRIPPING FORCE|Y
01|194976|8|1|SOLID NUT - TECHNIKS STYLE|Y
01|194990|1|1|These are specials.|Y
01|194990|1|2|These cannot be cancelled or returned.|Y
01|194994|2|1|This item is discontinued and non-returnable. \|Y
01|194995|1|1|**No Drive/Makino Pins**|Y
01|195008|6|1|CAT50-Z12-130U CAT50 Tension/Compression Tap Holder #1|Y
01|195008|14|1|ZKG12-1/4S|Y
01|195008|14|2|#1 TorqueControl Tap Collet 6.3 X 5mm|Y
01|195008|15|1|ZKG12-5/16S|Y
01|195008|15|2|#1 TorqueControl Tap Collet 8 X 6.3mm|Y
01|195008|16|1|ZKG12-3/8S|Y
01|195008|16|2|#1 TorqueControl Tap Collet 10 X 8mm|Y
01|195008|17|1|ZKG12-7/16S|Y
01|195008|17|2|#1 TorqueControl Tap Collet 8 X 6.3mm|Y
01|195008|18|1|ZKG12-1/2S|Y
01|195008|18|2|#1 TorqueControl Tap Collet 9 X 7.1mm|Y
01|195017|2|1|Stallion S2 - Shelf unit trunnion table with double|Y
01|195017|2|2|sided working surface.  Machined for a Nikken CNC180|Y
01|195017|2|3|with Orange D4-750-96mm Vise Pattern in deck on both|Y
01|195017|2|4|sides.  Shelf 2 thick between vises.|Y
01|195017|5|1|Stallion S3 - 3 Sided trunnion table with an 8x6|Y
01|195017|5|2|working surface.  Made from #35 cast iron.  Machined|Y
01|195017|5|3|for a Nikken CNC180 with Orange D4-750-96mm Vise|Y
01|195017|5|4|Pattern on all 3 sides.|Y
01|195017|8|1|2.0 Riser for Nikken CNC180 rotary table.|Y
01|195031|1|1|Quoted at NET price.|Y
01|195034|1|1|**Modified by LYN - Coolant Through the Flange|Y
01|195034|1|2|Cannot be cancelled or returned|Y
01|195034|1|3|Net price|Y
01|195038|1|1|RGA#TAR-59398|Y
01|195038|1|2|NCT150 SN:1059|Y
01|195042|1|1|1st Batch/Stock 7/22 approved by TimMFG11/30>2/20#2UPD|Y
01|195042|2|1|1st Batch/For stock 8/2/22:DWG Aapproved by BenMFG11/3|Y
01|195042|3|1|1st Batch/for stock 6/21/22 approved by BenMFG11/30>3/|Y
01|195046|11|1|This gage is optional. If you have a source to purchase|Y
01|195046|11|2|from I would check out the pricing with them.|Y
01|195046|11|3|The double sided gage is recommended.|Y
01|195047|2|1|replaces part# VMK8-1/8J|Y
01|195051|12|1|Adapter plate for KSP100|Y
01|195051|13|1|Schunk KSP100 mounted to table|Y
01|195051|15|1|Installation kit with labour and travel time.|Y
01|195066|1|1|IT50-C25-105|Y
01|195066|1|2|if no stock at time of order leadtime is 3 months aro|Y
01|195066|2|1|IT50-C25-135|Y
01|195066|2|2|lead time may change if order is delayed|Y
01|195074|2|1|Haas Certified Scale + Cable|Y
01|195074|2|2|Includes L/N Scale Mounting Kit and Cover|Y
01|195074|3|1|Includes labor/time/travel|Y
01|195074|3|2|Machine must have scale option from factory|Y
01|195074|3|3|as well as 3rd party rotary software installed for|Y
01|195074|3|4|Next Gen Controller|Y
01|195084|1|1|Req.INS/Make sure set screw is installed.|Y
01|195084|2|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|195084|3|1|Req.INS/Install E16-NUT & ER16-SCREW(S)|Y
01|195084|4|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|195085|1|1|If RTP orders 2 5AX-201's the discount will increase to|Y
01|195085|1|2|40% or $32460 each. Please pass this discount to RTP|Y
01|195085|2|1|Haas to have the machine 5 Axis ready.|Y
01|195085|2|2|Lyndex to install table provide cables and air lines|Y
01|195085|2|3|and change the parameters|Y
01|195088|12|1|Includes adapter plate and mounting|Y
01|195091|1|1|RGA#TAR-59329|Y
01|195091|1|2|5AX-2002FA|Y
01|195091|1|3|SN:2053|Y
01|195105|1|1|This item is being discontinued and replaced by|Y
01|195105|1|2|C4001-1250-4.00CP|Y
01|195114|1|1|Pending application approval|Y
01|195126|3|1|STALLION 9/23/HRT310|Y
01|195126|3|2|Stallion trunnion table with a 9x23 working surface|Y
01|195126|3|3|keyed for a Kurt D675/D688 vise.  Guaranteed flat|Y
01|195126|3|4|within .001 per 20.  Shipped complete with matching|Y
01|195126|3|5|outboard support to rotary table centerheight.|Y
01|195126|5|1|BASEPLATE for Stallion 9/23/HRT310|Y
01|195126|5|2|Baseplate is 1.25 thick for assembly.  Mounting holes|Y
01|195126|5|3|and keyways for a Haas HRT310 and Stallion 9/23.|Y
01|195126|5|4|1. Baseplate will be made to fit onto customer|Y
01|195126|5|5|specified machine tool.|Y
01|195126|5|6|2. Dowel pins will be used to locate plate into T-slots|Y
01|195126|5|7|of table. (provided by MMS).|Y
01|195126|5|8|3. Plate will mount to T-slot table with provide|Y
01|195126|5|9|hardware.|Y
01|195131|1|1|E236+ Presetter Training - 4 hours max. - Min. charge|Y
01|195133|1|1|Non-standard stock and considered specials.|Y
01|195133|1|2|These cannot be cancelled or returned.|Y
01|195137|2|1|Quoted a NET pricing.  Non-standard stock can not be|Y
01|195137|2|2|cancelled or returned.|Y
01|195159|3|1|HSK125A SPINDLE FOR E68LA|Y
01|195159|4|1|HSK125A MASTER GAUGE|Y
01|195159|5|1|ONLY 1 SET IS REQUIRED TO SERVICE ALL MACHINES|Y
01|195159|6|1|3 PCS FOR ALL 3 MACHINING CENTERS|Y
01|195159|7|1|3 PCS FOR ALL 3 MACHINING CENTERS|Y
01|195159|10|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|195171|2|1|LYN to make custom positioning block upon receipt|Y
01|195171|2|2|of spindle drawing information.|Y
01|195171|2|3|Delivery typically within 1 week receipt of info.|Y
01|195176|1|1|Special TG100 collet|Y
01|195176|1|2|.850 ID bore diameter nominal size|Y
01|195176|1|3|MOQ = 25pcs|Y
01|195176|1|4|SPECIAL ORDER = NON-CANCELABLE/NON-RETRUENABLE ARO|Y
01|195176|1|5|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|195176|2|1|Special TG100 collet|Y
01|195176|2|2|1.004 ID bore diameter nominal size|Y
01|195176|2|3|MOQ = 25pcs|Y
01|195176|2|4|SPECIAL ORDER = NON-CANCELABLE/NON-RETRUENABLE ARO|Y
01|195176|2|5|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|195179|3|1|Includes adapter plate and plumbing.|Y
01|195179|5|1|Includes adapter plate|Y
01|195201|1|1|This is a non-standard stock and considered a special.|Y
01|195201|1|2|Once a PO has been issued it cannot be cancelled or|Y
01|195201|1|3|returned.|Y
01|195216|3|1|SEALED FOR COOLANT THRU|Y
01|195216|4|1|NON-SEALED VERSION|Y
01|195231|1|1|CNC205AR21-RU77|Y
01|195231|1|2|AX21 RU77 Scale Subplate Color: White RS232C option|Y
01|195231|1|3|Special Model for Mitutoyo|Y
01|195231|2|1|CNC180LAR21-RU77|Y
01|195231|2|2|AR21 RU77 Scale Color: White RS232C option|Y
01|195231|2|3|Special Model for Mitutoyo|Y
01|195231|3|1|Color: White|Y
01|195231|5|1|PLC for FORM measuring machines.|Y
01|195231|7|1|CNCZ105LAR21-RU77|Y
01|195231|7|2|AR21 RU77 Scale Color: White RS232C option|Y
01|195231|7|3|Special Model for Mitutoyo|Y
01|195231|8|1|Color: White|Y
01|195231|12|1|Air Freight Cost for CNC180LAR21-RU77 & TAT-170N|Y
01|195248|4|1|This item is discontinued and non returnable.|Y
01|195254|1|1|Replaces part#OK101-73000|Y
01|195262|1|1|C5007-0032-12.00DIN-M|Y
01|195262|2|1|Order part # C5007-0016-12.00DIN-M|Y
01|195266|2|1|Glass Scale Kit|Y
01|195266|2|2|Glass Scale + Mounting + Wiring Kit|Y
01|195266|2|3|Scale will either be Heidenhain or Magnascale +/-5|Y
01|195268|1|1|**QTY BREAK PRICING:|Y
01|195268|1|2|10pc< 34% off list|Y
01|195268|1|3|20-29pc: 37% off list|Y
01|195268|1|4|30+pc:   40% off list|Y
01|195268|1|5|**Very good stock here in IL**|Y
01|195290|5|1|2 in stock ETA on more pieces is week of 5/1|Y
01|195299|1|1|Live and Static Tooling Certificate|Y
01|195302|1|1|H80F-SF0500-3.00|Y
01|195302|1|2|HSK80F 1/2 Shrink 3 GL w/Makino Pin|Y
01|195302|4|1|H80F-SF0750-2.75|Y
01|195302|4|2|HSK80F 3/4 Shrink 2.75 GL w/Makino Pin|Y
01|195305|1|1|Including Oil Change Service Cost|Y
01|195305|3|1|Includes removal of old table CNC170LAA21 and M-code|Y
01|195305|3|2|installation of new CNC180LAA21.|Y
01|195311|1|1|This is considered special only in stock at factory.|Y
01|195311|1|2|Once ordered cannot be cancelled or returned.|Y
01|195318|1|1|Create pn C5006-0250-6.00DIN-M|Y
01|195323|1|1|TAR-59083|Y
01|195323|1|2|CNC401 SN:8074|Y
01|195351|4|1|Quoted at Net price.|Y
01|195362|1|1|CAT50 1.1/2 SMH X 16.65 GL - COOLANT PORTS|Y
01|195362|1|2|ESTIMATED TOOLHOLDER WEIGHT TO BE 55LBS.|Y
01|195367|1|1|RGA#LVR-59421/|Y
01|195367|1|2|Repair of OKL3-ER32Z-OFMS s/n:AL0020 (Alps#OK109-15001)|Y
01|195367|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|195367|2|2|replaced.|Y
01|195371|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|195373|1|1|This is non-standard and considered a special.|Y
01|195373|1|2|Once a PO has been issued it cannot be cancelled or|Y
01|195373|1|3|returned.|Y
01|195377|1|1|Keiji/For PMTS and other shows.|Y
01|195377|3|1|Keiji/For PMTS and other shows.|Y
01|195377|4|1|Keiji/For PMTS and other shows.|Y
01|195377|5|1|Keiji/For PMTS and other shows.|Y
01|195392|1|1|RGA#TAR-59404|Y
01|195392|1|2|CNC202 SN:17012T|Y
01|195404|7|1|Additional 8 pcs due end of May|Y
01|195404|11|1|This wrench for SK20 and SK25 Not sure you'll want 2|Y
01|195404|27|1|This disk is used for SK20 or SK25|Y
01|195404|32|1|Used for SK20 and SK25|Y
01|195405|1|1|Includes: Haas motor and cable sets.|Y
01|195407|1|1|RGA#CUR-59427/|Y
01|195407|1|2|Repiar of C40RA-0025M s/n:18902340 17 (Mimatic#175241)|Y
01|195407|2|1|Bearings seals and o-rings to be replaced.|Y
01|195420|7|1|Special- cannot be cancelled or returned|Y
01|195426|1|1|Add SKN-16B(GH) and re-balance HSK63A-SK16C-150|Y
01|195426|1|2|to 25000 RPM. Quoted and NET price.|Y
01|195426|1|3|RGA: MOD-59490|Y
01|195428|1|1|Quoted at NET pricing|Y
01|195428|2|1|Quoted at NET pricing|Y
01|195428|4|1|Please Note: Alps Japan currently has 3-pcs in stock.|Y
01|195428|4|2|Net price quoted is for 3-pcs. They might want to|Y
01|195428|4|3|order the 10-pcs and we can ship 3 in right away.|Y
01|195428|4|4|If you need these please order right away as they|Y
01|195428|4|5|might be purchased by another company anywhere in the|Y
01|195428|4|6|world. Thank you.|Y
01|195433|1|1|1st Batch/942285 2/28:DWG Saved in Teams File.|Y
01|195433|2|1|1st Batch/(1)935451/S&S 12/13:DWG Saved in Teams File|Y
01|195452|1|1|BT30-SK10-75P-J|Y
01|195452|1|2|BT30 Slim Chuck SK10 with High Speed & Coolant Nut|Y
01|195452|1|3|(SKN-10KJ(GH)) 40000rpm with Balamce.|Y
01|195470|1|1|AC 100V|Y
01|195505|1|1|RGA#LVR-59436/|Y
01|195505|1|2|Repair of MNL12-ER32Z-MS-10K s/n:A0015|Y
01|195505|1|3|(Alps#MSA01-3W000S)|Y
01|195505|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|195505|2|2|replaced. If the spindle can be reused the cost will|Y
01|195505|2|3|be $2544.40|Y
01|195505|4|1|RGA#LVR-59436/|Y
01|195505|4|2|Repair of MNL12-ER32Z-MS-10K s/n:A0016|Y
01|195505|4|3|(Alps#MSA01-3W000S)|Y
01|195505|5|1|Bearings o-rings collet nuts and spindle to be|Y
01|195505|5|2|replaced. If the spindle can be reused the cost will|Y
01|195505|5|3|be $2544.40|Y
01|195506|1|1|1st BatchMFG7/22>3/10#9UPD2/16>>AIR|Y
01|195506|2|1|1st Batch/For stock 4/17/20:DWG Approved/ARMFG'21>3/10|Y
01|195512|1|1|ER32 X-Axis Straight V-Type Offset 1:2 Gear Ratio|Y
01|195514|1|1|This item is considered special once ordered cannot|Y
01|195514|1|2|be cancelled or returned.|Y
01|195517|1|1|RGA#TAR-59408|Y
01|195517|1|2|5AX-201FA SN:1127|Y
01|195517|3|1|TILT-WIRE-HARNESS|Y
01|195517|4|1|ROTARY WIRE HARNESS|Y
01|195537|2|1|Item is non-standard stock and can not be|Y
01|195537|2|2|cancelled or returned.|Y
01|195583|2|1|Delivery: 6 in stock / (4)Stock in Germany 2~3 Weeks|Y
01|195583|2|2|1-pc 13 Weeks|Y
01|195606|1|1|CAT50-Z12-130U CAT50 Tension/Compression Tap Holder #1|Y
01|195615|5|1|INCLUDES 8 HOURS TOTAL FOR INSTALL & TRAINING|Y
01|195629|11|1|Crossover for Big BBT40-HMC20S-75|Y
01|195630|2|1|Quoted at Net Price|Y
01|195655|1|1|Motor with F4/4000|Y
01|195655|2|1|SP Cable Cover same as CNC202 (S/N 25141TF)|Y
01|195655|2|2|Width 80mm  Powder Color Black|Y
01|195655|3|1|TCE-95945-3150R Power Cable|Y
01|195655|3|3|TCE-95949-3150R Feedback Cable|Y
01|195658|1|1|RGA#TAR-59408|Y
01|195658|1|2|5AX-201FA|Y
01|195658|1|3|SN:1157|Y
01|195658|5|1|ROTARY WIRE HARNESS|Y
01|195658|6|1|TILT WIRE HARNESS|Y
01|195660|1|1|Price reflects a purchase order of 1~4 Boring Units|Y
01|195660|2|1|Price reflects a purchase order of 5~10 Boring Units|Y
01|195660|3|1|Price reflects a purchase order of 11~14 Boring Units|Y
01|195674|4|1|for .0625|Y
01|195674|6|1|for .0935|Y
01|195674|7|1|Might need to go with a SKJ10-BLANK?|Y
01|195674|8|1|for .1835|Y
01|195674|10|1|for .2185|Y
01|195674|12|1|for .240|Y
01|195683|1|1|Repair of MZMP47-ER32Z-ICE  s/n:86648 04|Y
01|195683|1|2|(Mimatic#124864)|Y
01|195683|2|1|Option#1 - Bearings seals and orings to be replaced.|Y
01|195683|3|1|Option#2 - Bearings seals o-rings and ER spindle to|Y
01|195683|3|2|be replaced.|Y
01|195683|4|1|Option#3 - Bearings seals and o-rings to be replaced.|Y
01|195683|4|2|Resurfacing ER spindle.|Y
01|195683|5|1|Option#4 - Bearings seals o-rings ER spindle and|Y
01|195683|5|2|gears to be replaced.|Y
01|195683|6|1|Replacement Parts: Shaft|Y
01|195683|7|1|Replacement Parts: Spindle|Y
01|195683|8|1|Replacement Parts: Gears|Y
01|195683|11|1|Repair of MZMP47-ER32X-OFF-C  s/n:73634 07|Y
01|195683|11|2|(Mimatic#124255)|Y
01|195683|12|1|Option#1 - Bearings seals and orings to be replaced.|Y
01|195683|13|1|Option#2 - Bearings seals o-rings and ER spindle to|Y
01|195683|13|2|be replaced.|Y
01|195683|14|1|Option#3 - Bearings seals and o-rings to be replaced.|Y
01|195683|14|2|Resurfacing ER spindle.|Y
01|195683|15|1|Option#4 - Bearings seals o-rings ER spindle and|Y
01|195683|15|2|gears to be replaced.|Y
01|195683|16|1|Replacement Parts: Input Spindle|Y
01|195683|17|1|Replacement Parts: Output Spindle|Y
01|195683|18|1|Replacement Parts: Gears|Y
01|195684|1|1|RGA#TAR-59437|Y
01|195684|1|2|5AX-2002 SN:1525|Y
01|195713|1|1|Includes swing box|Y
01|195713|3|1|Price without swing box booster to be mounted in motor|Y
01|195713|3|2|cover area|Y
01|195715|1|1|Discount reflects Tooling Certificate pricing|Y
01|195720|3|1|Installation inlcudes: Dual axis drive unit short bar|Y
01|195720|3|2|fiber optic cable communications cable bulkhed cables|Y
01|195720|3|3|external cables parameter changes service time and|Y
01|195720|3|4|and travel.|Y
01|195721|3|1|**Ladder needs to be present for tables as well as an|Y
01|195721|3|2|axis expansion card to handle the Rotary Tables.|Y
01|195725|1|1|SPECIAL ONE-TIME PRICING ALLOWING AN ADDITIONAL 5%|Y
01|195725|1|2|DISCOUNT TOTAL DISCOUNT 35% MAX.|Y
01|195728|1|1|SPECIAL ONE TIME ONLY NET PRICE|Y
01|195733|1|1|OKEX-ER25X-OFF-C  OKUMA LIVE BMT60|Y
01|195733|1|2|STRAIGHT OFFSET OUTPUT ER25 INTERNAL/ EXTERNAL COOLANT|Y
01|195733|10|1|OKEX-SK20X-OFF-HS2-ICE|Y
01|195733|10|2|OKUMA LIVE; BMT60; SK20 STRAIGHT OFFSET V=50mm;L=107mm|Y
01|195733|10|3|INT/ EXT COOLANT/ ICE; 1015PSI;|Y
01|195733|10|4|1:2 GEAR MAX IN 6000RPM; MAX OUT 12K RPM;|Y
01|195733|10|5|MAX TORQUE M=25Nm;|Y
01|195737|1|1|TABLE COMES WITH AIR/HYDRAULIC BOOSTER INSTALLED|Y
01|195737|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|195737|5|1|Okuma Red White & Blue Promo - Free $2000 Tooling|Y
01|195737|5|2|Certificate w/ Purchase of 4th Axis Rotary Table|Y
01|195748|2|1|HSK50A-MMC8C-157-AA|Y
01|195748|3|1|HSK50A-MMC4-128-AA|Y
01|195748|4|1|Part # HSK50A-SZF6C-120|Y
01|195762|4|1|KIT FOR INSTALLATION OF 4TH AXIS ON SMART SV2|Y
01|195762|4|2|AMPLIFIFER ALL CABLING & CONNECTORS + PARAMETERS|Y
01|195763|3|1|Special- cannot be returned or cancelled|Y
01|195767|1|1|Special 2pcs replacement pricing includes core deposit|Y
01|195770|3|1|ATD19-1/2UA Tap Collet  .367 X .275|Y
01|195779|1|1|RGA#CUR-59468/|Y
01|195779|1|2|Repair of MRAM-MI32L-IC s/n:65606 01 (Mimatic#159993)|Y
01|195779|2|1|Bearings seals o-rings 1 output spindle with locknut|Y
01|195779|2|2|to be replaced.|Y
01|195786|1|1|RGA#LVR-59459/|Y
01|195786|1|2|Repair of MZQT47-ER32Z s/n:98908 05 (Mimatic#124635)|Y
01|195786|2|1|Bearings seals o-rings and damaged gears to be|Y
01|195786|2|2|replaced.|Y
01|195795|1|1|H100A-SF0750-7.00CP  3/4 Shrink Fit Holder|Y
01|195795|1|2|with Coolant Ports|Y
01|195800|1|1|Keiji/For PMTS and other shows.|Y
01|195827|1|1|CNC205AA21-RU77|Y
01|195827|1|2|AA21 RU77 Scale Subplate RS232C option Color:White|Y
01|195827|1|3|Holizontal MaxLoad:100kg SP Model for Mitutoyo|Y
01|195827|2|1|CNC202AA21-RU77|Y
01|195827|2|2|AX21 RU77 Scale Subplate RS232C option|Y
01|195827|2|3|Holizontal MaxLoad:200kg SP Model for Mitutoyo|Y
01|195827|3|1|CNC260AA21-RU77|Y
01|195827|3|2|AX21 RU77 Scale Subplate RS232C option|Y
01|195827|3|3|Holizontal MaxLoad:350kg SP Model for Mitutoyo|Y
01|195827|4|1|CNC302AA21-RU77|Y
01|195827|4|2|AX21 RU77 Scale Subplate RS232C option|Y
01|195827|4|3|Holizontal MaxLoad:350kg SP Model for Mitutoyo|Y
01|195834|5|1|INCLUDES 8 HOURS TOTAL FOR INSTALL & TRAINING|Y
01|195846|1|1|P/N: C1SB90 M-4770|Y
01|195846|1|2|Above replaces Cylinder P/N: HH960C90 M-1255|Y
01|195846|1|3|discontinued cylinder.|Y
01|195846|1|4|Mounting dimensions and max RPM stays the same but|Y
01|195846|1|5|there are some changes. See drawings for reference.|Y
01|195861|1|1|Items are non returnable non-cancelable speicials|Y
01|195861|1|2|Net price includes the following parts for assembly|Y
01|195861|1|3|at Lyndex-Nikken: HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|195861|1|4|customer's supplied RFID chip and holder re-balanced.|Y
01|195861|2|1|Customer providing balluf chip to be installed on|Y
01|195861|2|2|holder and balanced included in price of toolholder|Y
01|195861|3|1|HS coolant nut installed included in price of holder|Y
01|195861|4|1|Coolant back-up screw and coolant tube installed|Y
01|195861|6|1|Items are considered non cancelablenon returnable|Y
01|195861|6|2|Net price includes the following parts for assembly|Y
01|195861|6|3|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|195861|6|4|customer's supplied RFID chip and holder re-balanced.|Y
01|195861|7|1|Customer providing balluf chip to be installed on|Y
01|195861|7|2|holder and balanced included in price of toolholder|Y
01|195861|8|1|HS coolant nut installed included in price of holder|Y
01|195861|9|1|Coolant back-up screw and coolant tube installed|Y
01|195861|9|2|included in price of toolholder|Y
01|195861|11|1|Items are non-cancelablenon-returnable specials|Y
01|195861|11|2|Net price includes the following parts for assembly|Y
01|195861|11|3|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|195861|11|4|customer's supplied RFID chip and holder rebalanced|Y
01|195861|12|1|Customer providing balluf chip to be installed on|Y
01|195861|12|2|holder and balanced included in price of toolholder|Y
01|195861|13|1|HS coolant nut installed included in price of holder|Y
01|195861|14|1|Coolant back-up screw and coolant tube installed|Y
01|195861|14|2|included in the price of the holder|Y
01|195862|5|1|This is a demo unit that has been in our showroom and|Y
01|195862|5|2|will have the same warrantee as a new machine.|Y
01|195864|1|1|RGA#CUR-59374/|Y
01|195864|1|2|Repair of CAT40U-NX5-153 s/n:PDOE-019|Y
01|195872|1|1|HSK63A-FMC27-60  HSK63A Shell Mill Holder 27mm|Y
01|195875|7|1|**No Jet Slot Cap in this Size**|Y
01|195875|8|1|**No Jet Slot Cap in this Size**|Y
01|195875|24|1|**No Jet Slot Cap in this Size**|Y
01|195875|46|1|**No Jet Slot Cap in this Size**|Y
01|195875|47|1|**No Jet Slot Cap in this Size**|Y
01|195875|48|1|**No Jet Slot Cap in this Size**|Y
01|195881|2|1|HSK63A-C20-85|Y
01|195884|1|1|SPECIAL 1 TIME CORE TRADE IN PRICE|Y
01|195893|2|1|Please Note: We have changed the part number to|Y
01|195893|2|2|C5006-0375-6.00 however we do have 3 C5026-0375-6.00|Y
01|195893|2|3|in stock.|Y
01|195898|1|1|RGA#LVR-59475/|Y
01|195898|1|2|Repair of MNL12-ER32Z-MS s/n:A2032 (Alps#T32216)|Y
01|195898|2|1|Bearings o-rings collet nut and spindle to be|Y
01|195898|2|2|replaced. If the spindle can be reused the cost will|Y
01|195898|2|3|be $1841.20|Y
01|195906|1|1|RGA#LVR-59420/|Y
01|195906|1|2|Repair of OKU-L470-X s/n:AL093 (Alps#OK102-18000)|Y
01|195906|2|1|Bearings o-rings collet nut and spindle to be|Y
01|195906|2|2|replaced. If the spindle can be reused the cost will|Y
01|195906|2|3|be $1109.60|Y
01|195909|1|1|P/N: TBD Connector for C1SB-115-M4774|Y
01|195909|2|1|P/N: TBD Mechanical seals for the C1SB-115-M4774|Y
01|195915|4|1|NBT30-SK6C-60P-J|Y
01|195915|5|1|HSK63A-SK6C-100P-J|Y
01|195915|64|1|Optional BT30 assembly fixture is SMC wants two sep.|Y
01|195915|64|2|assembly stations. This for BT30 and then use TCL-63GH|Y
01|195915|64|3|for HSK63A toolling.|Y
01|195915|66|1|Optional interchangable head for TCL63GH to allow BT30|Y
01|195915|66|2|This is the Clamper Head ONLY.  Must have TCL Base from|Y
01|195915|66|3|HSK63A (TCL-63GH) to work.|Y
01|195920|1|1|RGA#CUR-59481/|Y
01|195920|1|2|Repair of C40RAM-ER25-215ST s/n:70 703 029 01|Y
01|195920|1|3|(Mimatic#135619)|Y
01|195920|2|1|Bearings seals o-rings and damaged input spindle to|Y
01|195920|2|2|be replaced.|Y
01|195934|1|1|RGA#LVR-59225/|Y
01|195934|1|2|Repair of 05.1311.7140.505 s/n:0915/10|Y
01|195934|1|3|(Mimatic#124610)|Y
01|195934|2|1|Bearings seals o-rings damaged gears and damaged|Y
01|195934|2|2|input spindle to be replaced.|Y
01|195960|5|1|INCLUDES 8 HOURS FOR INSTALL & TRAINING TOTAL|Y
01|195966|9|1|PS-551|Y
01|195966|10|1|CAT50 Taper Pot + Guide Key Set|Y
01|195973|1|1|Qty 5pc MIN|Y
01|195973|2|1|Qty Break 10pc+|Y
01|195975|1|1|One time special discount.|Y
01|195981|1|1|BT30 20mm 125mm GL Part # BT30-SF20-125|Y
01|195981|1|2|6 pcs = $413.00|Y
01|195981|1|3|9 pcs = $307.00|Y
01|195981|2|1|BT30-SF20-120|Y
01|195981|2|2|6 pcs = $169 net each|Y
01|195981|2|3|9 pcs = $169 net each|Y
01|195985|1|1|CAT50 40m Face Mill Holder with 4 bolts.|Y
01|195985|1|2|Part# CAT50-FMB40F-60|Y
01|195997|1|1|Req.INS until tolerance issue gets resolved.|Y
01|195997|2|1|Req.INS until tolerance issue gets resolved.|Y
01|195997|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|196029|1|1|This item is discontinued once ordered it cannot be|Y
01|196029|1|2|returned|Y
01|196037|1|1|P/N: BT40-TB40-300|Y
01|196037|1|2|Installed with Pull Stud P/N: XXXX at factory|Y
01|196037|1|3|MFG 45 days ** If pull stud is in stock|Y
01|196037|3|1|P/N: BT30-TB40-300|Y
01|196037|3|2|Installed with Pull Stud P/N: XXXX at factory|Y
01|196037|3|3|MFG 45 days ** If pull stud is in stock|Y
01|196040|1|1|HSK100A-C32-300  HSK100A-Milling Chuck 32mm X 300mm|Y
01|196040|1|2|gage length.|Y
01|196040|2|1|S32-SK13-300|Y
01|196040|2|2|32mm Straight Shank Extension Slim Chuck SK13|Y
01|196056|3|1|**Requires a pull stud to be quoted separate and|Y
01|196056|3|2|added on at factory|Y
01|196060|1|1|Option: 01|Y
01|196060|2|1|Option: 02|Y
01|196060|4|1|Included with Tables|Y
01|196060|5|1|Included with Tables|Y
01|196060|7|1|Subject to change depending on part weight info|Y
01|196060|8|1|Subject to change depending on part weight info|Y
01|196060|8|2|Riser Modification to PBA-310 Included|Y
01|196144|1|1|P/N: TBD|Y
01|196144|1|2|Tool Holder Capto C5; coolant supply through spindle|Y
01|196144|1|3|and via injection tube; filter fineness: max. 0.05mm|Y
01|196144|1|4|constant dry run possible with sufficient cooling phase|Y
01|196144|1|5|max. mold temperature 90C: no reversal of direction of|Y
01|196144|1|6|rotation (drive direction equal to output direction)|Y
01|196144|1|7|L1=109mm; Gear ratio:i(n1/n2)=2.5:1; max. coolant|Y
01|196144|1|8|pressure: p(max)= 70bar; max. torque M(max)=200Nm|Y
01|196144|1|9|max. input speed: nl(max)=5.000RPM|Y
01|196144|2|1|P/N: TBD|Y
01|196144|2|2|Drive Shaft SK50 accoring to ISO7388-1 -->|Y
01|196144|2|3|(forner DIN 69871) complete with standard torque|Y
01|196144|2|4|support according to ISO 9524 and locking device|Y
01|196144|2|5|(without machine-side stop block)> to be adapted to the|Y
01|196144|2|6|BAZ by the customer  For a stable and rigid mounting of|Y
01|196144|2|7|the angle head to the machine we strongly recommend a|Y
01|196144|2|8|3-point support adapted to the machine. Otherwise no|Y
01|196144|2|9|guarantee can be given for any stability problems.|Y
01|196144|2|10|A=80mm / d=18mm|Y
01|196168|1|1|CNC260AA21-RU77|Y
01|196168|1|2|AX21 RU77 Scale Subplate RS232C option Holizontal|Y
01|196168|1|3|MaxLoad:350kg  NOTE: 1st set:6/2 2nd set:E/Jul|Y
01|196168|2|1|CNCZ105LAR21-RU77|Y
01|196168|2|2|AA21 RU77 Scale RS232C option|Y
01|196168|2|3|NOTE: 1st set:6/2 2nd set:E/Jul|Y
01|196168|4|1|PLC for FORM measuring machines.|Y
01|196169|1|1|Req.INS until tolerance issue gets resolved.|Y
01|196169|2|1|Req.INS until tolerance issue gets resolved.|Y
01|196169|3|1|INS 2/3:DWG(w/ScrewOnKeys)APRVD by Ben.|Y
01|196169|4|1|Req.INS until tolerance issue gets resolved.|Y
01|196169|5|1|Req.INS until tolerance issue gets resolved.|Y
01|196169|6|1|INS 2/3:DWG(w/ScrewOnKeys)APRVD by Ben.|Y
01|196169|7|1|Req.INS:Need to check dual contact tolerance.|Y
01|196169|8|1|Req.INS:Need to check dual contact tolerance.|Y
01|196169|9|1|Req.INS:Need to check dual contact tolerance.|Y
01|196169|10|1|Req.INS:Need to check dual contact tolerance.|Y
01|196169|11|1|Req.INS:Need to check dual contact tolerance.|Y
01|196169|12|1|Req.INS until tolerance issue gets resolved.|Y
01|196177|1|1|CNCZ105LAA21-RU77|Y
01|196177|1|2|AX21 RU77 Scale RS232C option|Y
01|196177|3|1|PLC|Y
01|196183|2|1|Modification of Arbor Screw - add jet slots|Y
01|196184|1|1|This is for a used/demo unit one time discount|Y
01|196191|2|1|HEIDENHEIN SCALE FOR TILT & ROTARY AXES|Y
01|196191|2|2|RCN8390 (INCLUDES SCALES AND MOUNTING KIT)|Y
01|196191|2|3|SEE HEIDENHEIN LITERATURE FOR ACCURACY INFORMATION|Y
01|196191|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|196210|1|1|Replacement table casting only. Using existing parts of|Y
01|196210|1|2|SNC170L Rotary table for retrofit (Motor/Cable/ETC)|Y
01|196210|1|3|Wiring diagram needed upon time of order.|Y
01|196213|5|1|Old Part# will no longer exist.|Y
01|196213|8|1|2 Stock place order asap so we do not lose inventory.|Y
01|196214|5|1|Old Part# will no longer exist.|Y
01|196214|8|1|2 Stock place order asap so we do not lose inventory.|Y
01|196215|5|1|Old Part# will no longer exist.|Y
01|196215|8|1|2 Stock place order asap so we do not lose inventory.|Y
01|196217|2|1|Hard Balance of assembly|Y
01|196217|2|2|Ref. RGA# TOR-59422|Y
01|196224|1|1|CNC401BFA as standard type|Y
01|196245|8|1|SK6-1/4AC|Y
01|196245|8|2|Net price has been quoted. This is considered special|Y
01|196245|8|3|cannot be cancelled or returned.|Y
01|196250|1|1|RGA#LVR-59494/|Y
01|196250|1|2|Repair of MNL12-ER32Z s/n:A0107 (Alps#T32207)|Y
01|196250|2|1|Bearings o-rings collet nut and drive shaft to be|Y
01|196250|2|2|replaced.|Y
01|196290|1|1|Table and drive only.|Y
01|196293|5|1|CNC180LFA match s/n.15972 W/O groove and extra work|Y
01|196293|6|1|TCE-A3016/4 Direct mount power cable|Y
01|196293|7|1|TCE-94828/1 Direct mount feedback table|Y
01|196293|8|1|CNC180LFA repair cost at the worst senario|Y
01|196293|10|1|CNC202-2W-250FA repair cost at the worst senario|Y
01|196293|11|1|Modified Keyways for Hitachi Astemo GA|Y
01|196294|15|1|Modified Keyways for Hitachi Astemo GA|Y
01|196294|16|1|TCE-A3043/2 Direct mount power cable|Y
01|196294|17|1|TCE-94828/1 Direct mount feedback cable|Y
01|196312|1|1|RGA#LVR-59497/|Y
01|196312|1|2|Repair of NK103-16000-02 s/n:AL0028 (Alps#NK103-16000)|Y
01|196312|2|1|Bearings o-rings collet nut and spindle to be|Y
01|196312|2|2|replaced. If the spindle can be reused the cost will|Y
01|196312|2|3|be $1512.80|Y
01|196313|1|1|3.50 Gage Length|Y
01|196321|3|1|Quoted at NET price.|Y
01|196322|1|1|CNC260AA21-RU77|Y
01|196322|1|2|AA21 RU77 Scale Subplate RS232C option Holizontal|Y
01|196322|1|3|MaxLoad:350kg: 1st set:Target June/early 2nd:July/end|Y
01|196322|2|1|CNC180AA21-RU77 (Righty)|Y
01|196322|2|2|AA21 RU77 ScaleRS232C option|Y
01|196322|2|3|1st set:Target June/early 2nd:July/end|Y
01|196322|3|1|1st set:Target June/early 2nd:July/end|Y
01|196322|4|1|PLC for FORM measuring machines|Y
01|196322|5|1|PLC engineering/developement|Y
01|196322|5|2|March and April 2023|Y
01|196322|8|1|Air Freight Cost for CNC180AA21-RU77 & TAT-170N: 1 set|Y
01|196324|4|1|NBT30-ZDS12-105|Y
01|196324|5|1|ZDK12-6-J|Y
01|196333|1|1|RGA#TAR-59503 SN:20558|Y
01|196337|3|1|6m cable set|Y
01|196337|5|1|Installation includes: Dual axis drive unit short bar|Y
01|196337|5|2|fiber optic cables communications cables bulkhead|Y
01|196337|5|3|cables external cables parmeter changes service time|Y
01|196337|5|4|and travel.|Y
01|196338|1|1|BT50-ZMAC70-270V|Y
01|196344|3|1|Line item contains the following:|Y
01|196344|3|2|x2 Metal Ring for back of tailstock|Y
01|196344|3|3|x2 brackets for prox sensors (above)|Y
01|196344|3|4|x1 metal shroud to fit entire back of tailstock|Y
01|196352|2|1|Needs additional Fanuc Axis Software Option and|Y
01|196352|2|2|Polar detect function|Y
01|196365|1|1|Bombardier #GC000650|Y
01|196365|2|1|Bombardier #GC000648|Y
01|196365|3|1|Bombardier #GC000649|Y
01|196389|15|1|**non-coolant|Y
01|196389|16|1|*can use for 6mm coolant|Y
01|196390|2|1|Cable included in Installation.|Y
01|196390|3|1|Cable included in installation.|Y
01|196390|6|1|1634-2000 - 16 3-jaw Steel Body Large Bore Scroll|Y
01|196390|6|2|Chuck and adapter plate.|Y
01|196394|2|1|Installation includes: Drive unit short bar fiber|Y
01|196394|2|2|optic cable communications cable bulkhead cables|Y
01|196394|2|3|external cables parameter changes service time and|Y
01|196394|2|4|travel. Includes wiring workholding M-codes from tank|Y
01|196394|2|5|to provided I.O locations. M-codes must be present.|Y
01|196394|3|1|1000psi pump with 3-solenoid and pressure switches.|Y
01|196401|1|1|Due in on 7/5|Y
01|196416|1|1|Discontinued item cannot be returned.|Y
01|196436|11|1|Optional: Recommended|Y
01|196444|2|1|KM20-10.5|Y
01|196444|2|2|Straight Collet/Sleeve OD 20mm ID 10.5mm Large Chamfere|Y
01|196468|1|1|Req.INS/Hold until TQW-ER16/SK13(32)   soldMFGInstock>|Y
01|196468|2|1|1st Batch/*DWG saved in Eng. file.|Y
01|196468|3|1|1st Batch/DWG saved in Eng. File.MFG1/30>3/10#1UPD2/16|Y
01|196468|4|1|1st Batch/DWG saved in Eng. File.MFG1/30>3/10#1UPD2/16|Y
01|196468|5|1|Req.INS/Hold until SK10(1) is sold.(10)2/17A/1stBat(18|Y
01|196468|6|1|Req.INS/Hold until sold TQW-SK16(43)-M(10)11/11A 1st B|Y
01|196468|7|1|Req.INS/Hold until sold TQW-SK16(43)-MMFG1/30>3/10#2UP|Y
01|196468|8|1|Req.INS/Hold until sold TQW-SK25(60)(10)11/11A 1st Bat|Y
01|196471|1|1|Mimatic Part # 190258 ref drwg 00051403|Y
01|196471|1|2|6pc price is $6264.35 net each|Y
01|196471|2|1|Mimatic Part # 186327 / ref drwg 00047749|Y
01|196471|2|2|6pc price $6180.96 net each|Y
01|196471|3|1|Mimatic Part # 164438|Y
01|196471|3|2|Polysaw insert D80x1.0  Z=40 BW|Y
01|196471|3|3|Typ PSG8025  Tinamatic 3|Y
01|196471|4|1|Mimatic part # 164439|Y
01|196471|4|2|Polysaw insert D80x1.5  Z=40 BW|Y
01|196471|4|3|Typ PSG8025  Tinamatic 3|Y
01|196472|2|1|Interface components:amp fiber optic cables external|Y
01|196472|2|2|cables interface cables short bar communications|Y
01|196472|2|3|cable|Y
01|196472|2|4|Note: will need Fanuc data sheets and picture of the|Y
01|196472|2|5|cabinet prior to shipment|Y
01|196476|11|1|*Replacment for part# C40S5-0562-2.93|Y
01|196487|1|1|**Drawing is attached.|Y
01|196487|2|1|**Drawing is attached.|Y
01|196487|3|1|**Drawing is attached.|Y
01|196487|3|2|**Please check if it works for the customer's MC(ATC).|Y
01|196493|6|1|TMX 16 CHUCK BIG BORE 3-819-1600P|Y
01|196493|6|2|With Adapter Plate|Y
01|196497|1|1|1st Batch *3/15:DWG Approved/Customer|Y
01|196501|1|1|Qty Break Pricing:|Y
01|196501|1|2|6pc  $4800.00ea/net|Y
01|196501|1|3|8pc  $4430.00ea/net|Y
01|196501|1|4|10pc $4115.00ea/net|Y
01|196501|1|5|*Ref. Drawing# 191732|Y
01|196501|5|1|LYN to make positioning block upon receipt of spindle|Y
01|196501|5|2|drawing inforamation|Y
01|196510|2|1|Included with installation.|Y
01|196510|3|1|Included with installation.|Y
01|196510|5|1|2433-2000EX - 24 3-jaw King Bore Oil Country Chuck|Y
01|196510|5|2|and adapter plate.|Y
01|196510|7|1|INCLUDES 70MM RISER TO MATCH ROTARY CENTER HEIGHT|Y
01|196530|1|1|P/N: NBT30-C1.1/4-100|Y
01|196530|1|2|NBT30 Dual Contact Milling Chuck 1.1/4 8000 RPM|Y
01|196533|4|1|ZDK12-6-J|Y
01|196533|4|2|ZDK12 PositiveDrive Rigid Tap Collet .236x.177 6.0X4.5|Y
01|196533|4|3|Jet coolant type|Y
01|196533|5|1|ZDK12-8-J|Y
01|196533|5|2|ZDK12 PositiveDrive Rigid Tap Collet .244x.197 6.2X5.0|Y
01|196533|5|3|Jet coolant type|Y
01|196542|1|1|TEMP PART NUMBER.  Tool will be HSK63A-SK25-90P-J-IDU|Y
01|196542|1|2|High Speed Holder and comes with a Coolant Nut standard|Y
01|196542|2|1|TEMP PART NUMBER.  Tool will be HSK63A-SK25-135P-J-IDU|Y
01|196542|2|2|High Speed Holder and comes with a Coolant Nut standard|Y
01|196542|6|1|O-Ring Seal for TSC Drills and Tools.|Y
01|196542|7|1|Offered at an alternate for 19mm as it is only .002|Y
01|196542|7|2|larger than 19mm.|Y
01|196542|8|1|O-Ring Seal for TSC Drills and Coolant thru tools.|Y
01|196542|8|2|Offered at an alternate for 19mm as it is only .002|Y
01|196542|8|3|larger than 19mm.|Y
01|196561|1|1|RGA#CUR-59522/|Y
01|196561|1|2|Repair of CAT40U-NX5-153 s/n:NDAF-021|Y
01|196563|1|1|RGA#TAR-59525|Y
01|196563|1|2|TAT-105N SN: 4915B|Y
01|196576|1|1|**Item can not be cancelled or retured**|Y
01|196579|1|1|This item is special and can't be cancelled or returned|Y
01|196579|3|1|This item is special and can't be cancelled or returned|Y
01|196584|1|1|Net price is provided|Y
01|196584|2|1|SP Cable Cover same as CNC202 (S/N 25141TF)|Y
01|196584|2|2|Width 80mm  Powder Color Black|Y
01|196584|2|3|Net price provided|Y
01|196584|3|1|TCE-95945-3150R Power Cable|Y
01|196584|3|2|TCE-95949-3150R Feedback Cable|Y
01|196584|3|3|Net price provided|Y
01|196586|1|1|1st Batch 4/19KC:QTY5>>1 4p to PW|Y
01|196586|1|2|Invoiced QTY 5pcs P/L 1pc Received 1pc|Y
01|196586|2|1|1st Batch|Y
01|196586|3|1|1st Batch|Y
01|196586|4|1|1st Batch|Y
01|196586|5|1|1st Batch|Y
01|196586|6|1|1st Batch|Y
01|196586|7|1|1st Batch|Y
01|196586|8|1|1st Batch|Y
01|196586|9|1|1st Batch|Y
01|196586|10|1|1st Batch|Y
01|196586|11|1|1st Batch|Y
01|196586|12|1|1st Batch|Y
01|196586|13|1|Req.INS/Install E11-NUT-MINI&ER11-SCREW(C)/938620|Y
01|196586|14|1|1st Batch/DWG Saved in Eng. File.|Y
01|196586|15|1|1st Batch/DWG Saved in Eng. File.|Y
01|196586|16|1|Req.INS/Trinity Mill/GKN-NY *REPEAT Holder|Y
01|196586|17|1|1st Batch/944073 *DWG Saved in Teams File|Y
01|196586|18|1|1st Batch/944073 *DWG Saved in Teams File|Y
01|196599|2|1|SP Cable Cover same as CNC202 (S/N 25141TF)|Y
01|196599|2|2|Width 80mm Powder Color Black|Y
01|196599|3|1|TCE-95945-3150R Power Cable|Y
01|196599|3|2|TCE-95949-3150R Feedback Cable|Y
01|196607|2|1|SK10|Y
01|196607|3|1|SK16|Y
01|196607|4|1|SK20|Y
01|196607|5|1|SK25|Y
01|196607|6|1|3/4 Milling Chuck|Y
01|196607|7|1|1 Milling Chuck|Y
01|196616|1|1|1st Batch/DWG saved in Eng. File.MFG1/30>3/10#1UPD2/16|Y
01|196616|2|1|1st Batch/DWG saved in Eng. File.MFG2/28>3/10#1UPD2/16|Y
01|196616|3|1|1st Batch/DWG saved in Eng. File.MFG2/28>3/10#1UPD2/16|Y
01|196616|4|1|1st Batch/DWG saved in Eng. File.MFG1/30>3/10#1UPD2/16|Y
01|196616|5|1|1st Batch/DWG saved in Eng. File.MFG1/30>3/10#1UPD2/16|Y
01|196616|6|1|Req.Ins/Hold until sold TQW-ER32/SK20(50)|Y
01|196625|1|1|P/N TBD|Y
01|196625|1|2|90dg Offset 2 Spindle C5 Tool for Main/Sub use|Y
01|196625|1|3|ExtCoolant Only|Y
01|196625|1|4|similar to print 00061843|Y
01|196625|1|5|**Qty Break Net Pricing**|Y
01|196625|1|6|2pc $10350.00ea|Y
01|196625|1|7|3pc $10035.00ea|Y
01|196625|1|8|4pc $ 9615.00ea|Y
01|196625|3|1|P/N TBD|Y
01|196625|3|2|Static Capto C5x2 OD Holder for Main/Sub Int Coolant|Y
01|196625|3|3|Similar to attached WTO print|Y
01|196625|3|4|**Qty Break Net Pricing**|Y
01|196625|3|5|2pc $5900.00ea|Y
01|196625|3|6|3pc $5418.00ea|Y
01|196625|3|7|4pc $5307.00ea|Y
01|196625|11|1|Straight Offset C5 Tool for Sub Only Internal Coolant|Y
01|196625|11|2|Similar print 00057921 but rotated 180dg for Sub Spind|Y
01|196625|11|3|**Qty Break NET Pricing**|Y
01|196625|11|4|2pc $8143.00ea|Y
01|196625|11|5|3pc $7540.00ea.|Y
01|196625|13|1|P/N TBD|Y
01|196625|13|2|90dg C5 Tool for Sub Only Internal Coolant|Y
01|196625|13|3|Similar print 00058110 but rotated 180dg for Sub Spindl|Y
01|196625|13|4|2pc $10153.00ea|Y
01|196625|13|5|3pc $ 9460.00ea|Y
01|196625|18|1|P/N TBD|Y
01|196625|18|2|Mimatic# 198187|Y
01|196625|18|3|Static Capto C5 OD Holder Sub Only Internal Coolant|Y
01|196625|18|4|Similar print A198187  but rotated 180dg for Sub Spindl|Y
01|196625|18|5|**Net Pricing 1-3pcs**|Y
01|196625|20|1|P/N TBD|Y
01|196625|20|2|Mimatic part# 198243|Y
01|196625|20|3|Static Capto C5 ID Holder Sub Only Internal Coolant|Y
01|196625|20|4|Similar print A198243  but rotated 180dg for Sub Spindl|Y
01|196625|20|5|**Net Pricing 1-3pcs**|Y
01|196636|1|1|Installed with Nikken Pull Stud at factory|Y
01|196636|2|1|Specified Pull Stud will be added on Test Bar|Y
01|196636|2|2|at factory|Y
01|196637|1|1|modification jet slot 2-4 weeks|Y
01|196640|1|1|No INS Req'd.|Y
01|196649|1|1|No INS Req'd.|N
01|196649|2|1|No INS Req'd.|N
01|196649|3|1|No INS Req'd.|N
01|196649|4|1|No INS Req'd.|N
01|196649|5|1|No INS Req'd.|N
01|196649|6|1|No INS Req'd.|N
01|196649|7|1|No INS Req'd.|N
01|196649|8|1|No INS Req'd.|N
01|196649|9|1|No INS Req'd.|N
01|196664|1|1|TAR-59451|Y
01|196664|1|2|5AX-DD200BF2|Y
01|196705|2|1|This item is non standard stock. Once a purchase order|Y
01|196705|2|2|is placed it cannot be cancelled or returned.|Y
01|196705|3|1|This item is non standard stock. Once a purchase order|Y
01|196705|3|2|is palced it cannot be cancelled or returned.|Y
01|196705|4|1|This item is non standard stock. Once a purchase order|Y
01|196705|4|2|is place it cannot be cancelled or returned.|Y
01|196709|2|1|This item is non standard stock. Once a purchase order|Y
01|196709|2|2|is placed it cannot be cancelled or returned.|Y
01|196709|3|1|This item is non standard stock. Once a purchase order|Y
01|196709|3|2|is palced it cannot be cancelled or returned.|Y
01|196709|4|1|This item is non standard stock. Once a purchase order|Y
01|196709|4|2|is place it cannot be cancelled or returned.|Y
01|196714|1|1|This item is considered speical and cannot be cancelled|Y
01|196714|1|2|or returned.|Y
01|196739|4|1|TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|196740|3|1|PRICE IS FOR INSTALLATION ON A MU5000V WITH OKUMA APP|Y
01|196740|4|1|TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|196748|4|1|Includes Alpha 22iF motor.|Y
01|196750|1|1|PLEASE NOTE THE Z AXIS HEIGHT WILL BE REDUCED|Y
01|196750|1|2|BY 65MM WITH THE USE OF AN HSK63 SPINDLE.|Y
01|196750|7|1|A TOTAL OF 8 HOURS FOR BOTH INSTALL & TRAINING|Y
01|196764|3|1|WRENCH FOR 3/4 MILLING CHUCKS|Y
01|196764|4|1|3/4 DIRECT CHUCKING DISC FOR JET COOLANT|Y
01|196764|5|1|NO COST TO TEGRA|Y
01|196764|6|1|SPANNER WRENCH FOR CKFN20(3/4)-3/4D DISCS|Y
01|196784|1|1|TAR-59525 CNCZ202LSA S/N: 12042|Y
01|196784|19|1|Replaces UE7510010|Y
01|196784|22|1|Replaces 7003P5|Y
01|196784|24|1|Replaces SC25387|Y
01|196784|26|1|Replaces WP-13|Y
01|196801|1|1|TAR-59525 CNCZ180LSA-BR2 S/N: 20462T|Y
01|196812|1|1|HSK63 connector|Y
01|196812|1|2|Special HSK63A connector per drawing|Y
01|196828|1|1|Replacement for old part# 100245|Y
01|196828|1|2|Current LYN Part# MZMP5-MI63X-OFF-ICE|Y
01|196828|1|3|Mimatic Current Part# 189971|Y
01|196843|3|1|This includes chip hole installation of BIS-C-122-04/L|Y
01|196843|3|2|and rebalanced and etched with Bombardier part number.|Y
01|196843|3|3|These holders come with coolant ports.|Y
01|196874|1|1|Price for 2 tools >>$11233.00 less 20% Total $8986.00|Y
01|196874|1|2|Price for 3 tools >>$10100.00 less 20% Total $8080.00|Y
01|196874|1|3|Delivery is based upon receipt of purchase order after|Y
01|196874|1|4|final approval drawings have been signed and e-mailed|Y
01|196874|1|5|back to Lyndex-Nikken. Please note: This tool is|Y
01|196874|1|6|special. Once a purchase order is placed it cannot be|Y
01|196874|1|7|cancelled or returned.|Y
01|196876|1|1|This is for a used/DEMO unit and will come with 2 CAT40|Y
01|196876|1|2|taper pots and 1 cooling tower|Y
01|196894|1|1|Price for 2 tools >>$11233.00 less 20% Total $8986.00|Y
01|196894|1|2|Price for 3 tools >>$10100.00 less 20% Total $8080.00|Y
01|196894|1|3|Delivery is based upon receipt of purchase order after|Y
01|196894|1|4|final approval drawings have been signed and e-mailed|Y
01|196894|1|5|back to Lyndex-Nikken. Please note: This tool is|Y
01|196894|1|6|special. Once a purchase order is placed it cannot be|Y
01|196894|1|7|cancelled or returned.|Y
01|196907|3|1|PRE-SPDL-H100-RM  HSK100 Spindle Interchangeable|Y
01|196907|3|2|Mechanical Clamping Spindle|Y
01|196907|11|1|Installation and Training performed by Eric Hartman|Y
01|196907|11|2|at no charge.|Y
01|196913|1|1|STANDARD TABLE WITH NO MOTOR|Y
01|196913|1|2|CUSTOMER REQUIRED TO DO ANY MODIFICATIONS TO TABLE|Y
01|196913|1|3|OR BASEPLATE AS NECESSARY|Y
01|196913|2|1|remove tables off baseplate and machine extra features|Y
01|196913|2|2|re-qualify the table as new after re-assembly.|Y
01|196919|1|1|HSK63 connector|Y
01|196919|1|2|Special HSK63A connector per drawing|Y
01|196921|3|1|Quoted at Net Price|Y
01|196947|2|1|An additional 5% discount has been added to pass along|Y
01|196947|2|2|to the End User per our PMTS Live and Static Tool Promo|Y
01|196955|3|1|Stock Japan|Y
01|196955|4|1|**Balance of 31pcs Late April|Y
01|196955|6|1|**Balance of 26pcs ETA 4 mos ARO|Y
01|196955|10|1|Special- cannot be cancelled or returned|Y
01|196955|12|1|**Balance 21pcs 4mths MFG + SHIP|Y
01|196955|12|2|Special- cannot be cancelled or returned|Y
01|196955|14|1|**Balance 21pcs 3.5-4mths MFG + SHIP|Y
01|196955|15|1|Balance of 2 pcs 4 weeks|Y
01|196955|32|1|A tariff surcharge may be added to this quotation in|Y
01|196955|32|2|the event of a sustained tariff increase on the|Y
01|196955|32|3|importation of this product.  Any surcharge will be|Y
01|196955|32|4|disclosed prior to acceptance of an order.|Y
01|196965|3|1|LYN to make positioning block upon receipt of final|Y
01|196965|3|2|spindle drawing information|Y
01|196967|1|1|Req.INS/T/P Inspection RequiredMFG4/15UPD2/20>>7/M B|Y
01|196967|2|1|Req.INS/T/P Inspection Required|Y
01|196967|3|1|Req.INS/T/P Inspection Required|Y
01|196967|4|1|Req.INS/T/P Inspection Required|Y
01|196967|5|1|Req.INS/T/P Inspection Required|Y
01|196967|6|1|Req.INS/T/P Inspection Required|Y
01|196967|7|1|Req.INS/T/P Inspection Required|Y
01|196967|8|1|Req.INS/T/P Inspection Required|Y
01|196967|9|1|Req.INS/T/P Inspection Required|Y
01|196967|10|1|For stock/1st Batch 8/2/22 approved by BenMFG11/30>4/3|Y
01|196967|11|1|Req.INS/T/P Inspection Required7/M B|Y
01|196993|1|1|BIS-C-122-04/L  ID Chip - BALLUFF BIS0011|Y
01|196993|1|2|10mm in diameter and 4.5mm thick User date read/write|Y
01|196993|1|3|installed. Bombardier part #AV000128 to be etched|Y
01|196993|1|4|on tool.|Y
01|197000|1|1|Qty Break NET Pricing|Y
01|197000|1|2|1pc $16000.00each|Y
01|197000|1|3|2pc $12000.00each|Y
01|197000|15|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|197000|15|2|of spindle drawing|Y
01|197001|1|1|Please Note: Discount reflects a purchase order of|Y
01|197001|1|2|9 tools or more.|Y
01|197004|1|1|BMT65-C4Z-ICE-72 Live Tool C4|Y
01|197004|1|2|Mimatic# A197603|Y
01|197004|8|1|Included with the purchase of a shrink fit machine.|Y
01|197011|2|1|Need 1 Positioning Block per CNC Machine.|Y
01|197014|1|1|CAT40 MODULAR TAPER|Y
01|197014|2|1|POSITIONING PIN FOR CAT40 TAPER (65MM PITCH)|Y
01|197014|3|1|ER25 LONG MODULAR HEAD ATTACHMENT|Y
01|197014|4|1|CUSTOM POSITIONING BLOCK FOR HAAS CAT40 VF MACHINES|Y
01|197015|1|1|ER25 FIXED RIGHT ANGLE HEAD|Y
01|197015|2|1|CUSTOM POSITIONING BLOCK FOR HAAS CAT40 VF MACHINES|Y
01|197024|5|1|Spindle Wrench for SK live tools.|Y
01|197024|6|1|Wrench for SK20 Collet Nuts.|Y
01|197024|11|1|Spindle Wrench for ER32 live tools.|Y
01|197024|12|1|Wrench for ER32 Collet Nuts.|Y
01|197037|1|1|1st Batch(1/24APRVD by RY)/MOQ:7|Y
01|197056|1|1|Discount reflects purchase of x40 holders|Y
01|197061|2|1|Charge to re-label collets boxes with PT# GC000651.|Y
01|197073|1|1|for OSG 2890801|Y
01|197073|2|1|for OSG 2891001|Y
01|197073|3|1|for OSG 2891401|Y
01|197073|4|1|for OSG 2892301|Y
01|197110|1|1|Cables included|Y
01|197139|1|1|RGA#TAR-59529|Y
01|197139|1|2|NCT200EFA  SN:1487C|Y
01|197153|16|1|Wrench for anti-rotation of LT|Y
01|197155|1|1|MZQT5-C5X-OFF-ICE|Y
01|197155|1|2|Mazak Live Capto 5 X-Axis STRT V-Type Offset|Y
01|197155|1|3|IntExtCoolant 7MP|Y
01|197155|1|4|ref. Mimatic drawing# 197609|Y
01|197155|4|1|MZQT5-C5Z-ICE|Y
01|197155|4|2|Mazak Live Capto5 Z-Axis 90Deg H-Type IntExtCoolant 7MP|Y
01|197155|4|3|ref. Mimatic drawing# 197610|Y
01|197156|3|1|MNZ20-ER32Z in MS|Y
01|197156|3|2|11-12 months after drawing approved.|Y
01|197156|3|3|Item is custome/specialonce a PO has been received  it|Y
01|197156|3|4|can not be cancelled or returned.|Y
01|197180|1|1|STANDARD TABLE WITH NO MOTOR|Y
01|197180|1|2|CUSTOMER REQUIRED TO DO ANY MODIFICATIONS TO TABLE|Y
01|197180|1|3|OR BASEPLATE AS NECESSARY|Y
01|197180|2|1|remove tables off baseplate and machine extra features|Y
01|197180|2|2|re-qualify the table as new after re-assembly.|Y
01|197183|1|1|Qty Break NET Pricing:|Y
01|197183|1|2|1pc $15212.00ea/net|Y
01|197183|1|3|2pc $ 9701.00ea/net|Y
01|197183|1|4|3pc $ 7140.00ea/net|Y
01|197187|2|1|Includes drive unit short bar fiber optic cable|Y
01|197187|2|2|communications cable external cables parmeter changes|Y
01|197187|2|3|service time and travel.|Y
01|197192|3|1|HSK63A-HC16-90|Y
01|197192|3|2|HSK63A Hydraulic Chuck 16mm|Y
01|197192|5|1|NBT30-HC8-64|Y
01|197192|5|2|BT30 Hydraulic Chuck 8mm GL64mm|Y
01|197192|11|1|NBT30-HC12-72|Y
01|197192|11|2|NBT30 DualContact Hydraulic Chuck 12mm GL72mm|Y
01|197192|12|1|NBT30-HC18-90|Y
01|197192|12|2|NBT30 DualContact Hydraulic Chuck 18mm|Y
01|197192|20|1|ZDK12-10   #1 ZDK12 PositiveDrive Rigid Tap Collet M10|Y
01|197192|21|1|ZDK12-10-50L|Y
01|197192|21|2|#1 ZDK12 PositiveDrive Rigid Tap Collet M10 L50mm|Y
01|197192|22|1|ZDK12-10-100L|Y
01|197192|22|2|#1 ZDK12 PositiveDrive Rigid Tap Collet M10 L100mm|Y
01|197197|1|1|RGA#LVR-59564/|Y
01|197197|1|2|Repair of T32106 s/n:unknown|Y
01|197197|2|1|Bearings o-rings collet nut and spindle to be|Y
01|197197|2|2|replaced.|Y
01|197206|32|1|Please Note: This must ship by truck.|Y
01|197206|33|1|Please note: Two SF-POT-#50 are included with the|Y
01|197206|33|2|purchase of the SF-FI16-UNIY-200.|Y
01|197219|2|1|Quoted at NET price.|Y
01|197220|1|1|THIS IS A DEMO UNIT THAT HAS BEEN IN OUR SHOWROOM|Y
01|197220|1|2|IT WILL HAVE THE SAME WARRANTY AS A NEW MACHINE|Y
01|197245|1|1|RGA#TAR-59546|Y
01|197245|1|2|CN200LFA SN:8701|Y
01|197246|3|1|Quoted at NET price and based upon receipt of the|Y
01|197246|3|2|lathe spindle Form.|Y
01|197257|1|1|RGA#TAR-59546|Y
01|197257|1|2|CNC260 SN:UNKNOWN|Y
01|197289|1|1|Req.INS/T/P Inspection RequiredMFG4/30UPD3/20>>(8)5/5A|Y
01|197289|2|1|Req.INS/T/P Inspection Required(5)AIR (4)7/M B (2)5/5A|Y
01|197289|3|1|Req.INS/T/P Inspection RequiredMFG3/30>3/31#1UPD3/20>>|Y
01|197289|4|1|Req.INS/T/P Inspection RequiredMFG3/30UPD3/20>>(1)4/28|Y
01|197291|1|1|Nikken HSK63A-HTS1500-160 Air Turbine Spindle Tool|Y
01|197291|1|2|150000min-1|Y
01|197291|2|1|Stopper Block for Okuma MV6300V-L HSK63A|Y
01|197302|1|1|Note: Item can not be cancelled or returned.|Y
01|197317|2|1|Installation kit includes items below.|Y
01|197322|2|1|With E20-NUT-GBearing Smooth Nut|Y
01|197322|6|1|With E20-NUT-GBearing Smooth Nut|Y
01|197356|1|1|BRS-10.32 HSS Broach Reamer|Y
01|197365|1|1|LYN Part# OKEX-C4X-ICE|Y
01|197365|1|2|Okuma Live C4 X-Axis STRT ICE|Y
01|197365|1|3|ref. Mimatic drawing# 198884|Y
01|197365|2|1|LYN Part# OKEX-C4Z-ICE-70|Y
01|197365|2|2|Okuma Live C4 Z-Axis 90-Degree ICE|Y
01|197365|2|3|ref. Mimatic drawing# 197564|Y
01|197368|1|1|5AX-2MT-105-120FA-M SN: 8268F|Y
01|197368|1|2|SERVICE CALL AND CABLES|Y
01|197368|1|3|ROBODRILL T21IF SN: PO82Z0139|Y
01|197368|3|1|INTERNAL WIRE HARNESS FOR ROT AXIS PWR/FEED|Y
01|197368|3|2|ROT FBR = TCE-97748|Y
01|197368|3|3|ROT PWR = TCE-46076|Y
01|197368|3|4|TLT FBR = TCE-97222|Y
01|197368|3|5|ROT PWR = TCE-A4270|Y
01|197368|6|1|TILT AXIS PWR/FEEDBACK CABLES FROM ROTARY TABLE|Y
01|197368|6|2|TO CABINET - SET|Y
01|197368|6|3|PWR 28-11SZ|Y
01|197368|6|4|CABINET SIZE PWR: ROBODRILL CONN + 4 PIN FOR AMP|Y
01|197368|6|5|ROBODRILL CONNECTOR FOR SIGNAL/SOL|Y
01|197368|6|6|CABINET SIDE FB: 20-29SZ TO D SUB FOR AMP|Y
01|197368|7|1|Courrier Service for Cables to be delivered|Y
01|197377|1|1|Shipping Error will be shipped in May shipment.|Y
01|197377|1|2|INV#Pending|Y
01|197389|1|1|This item is considered special once an order is|Y
01|197389|1|2|placed it cannot be cancelled or returned.|Y
01|197407|1|1|Part # HSK63A-SK10C-105-J|Y
01|197407|1|2|HSK63A SK10 Collet Chuck with Coolant Nut|Y
01|197409|1|1|Quoted at Net Price.|Y
01|197414|12|1|WILL USE THIS SIZE FOR 2 & 3 MM TOOLS|Y
01|197455|1|1|**Comes with two free pots of your choice**|Y
01|197455|18|1|This package comes with 2 free pots of your choice and|Y
01|197455|18|2|includes ten standard inch size shrink fit holders with|Y
01|197455|18|3|less than 6 gage lengths.|Y
01|197459|4|1|Manual scroll chuck|Y
01|197459|5|1|Adapter for CNC601|Y
01|197469|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|197469|2|2|RUBBER/PLASTIC COVERING STYLE; NOT STEEL BRAIDED|Y
01|197469|4|1|MANUAL TAILSTOCK|Y
01|197469|5|1|PNUEMATIC TAILSTOCK|Y
01|197472|3|1|C5007-0032-5.00DIN-M|Y
01|197472|3|2|CAT40 ER20 Collet Chuck High Torque Bearing Nut DIN|Y
01|197472|3|3|modified.|Y
01|197472|4|1|We do not carry an ER20 short gage length so I added|Y
01|197472|4|2|the ER32. These holders cannot be DIN.|Y
01|197472|6|1|C4001-0500-1.75CP-DIN-M|Y
01|197472|6|2|CAT40 Shell Mill Holder 1/2 IdChipHole Coolant Ports|Y
01|197472|6|3|and DIN.|Y
01|197476|1|1|BT30-SF3-65|Y
01|197476|1|2|BT30 3mm 65mm GL shrink fit holder|Y
01|197476|2|1|BT30-SF3-90|Y
01|197476|2|2|BT30 3mm 90mm GL shrink fit holder.|Y
01|197476|3|1|NBT30-SF3-65|Y
01|197476|3|2|NBT30 DualContact Shrink Fit Holder 3mm|Y
01|197476|6|1|BT30-SF6-65|Y
01|197476|6|2|BT30 6mm 65mm GL shrink fit holder|Y
01|197476|7|1|NBT30-SF6-65|Y
01|197476|7|2|NBT30 DualContact Shrink Fit Holder 6mm|Y
01|197476|8|1|NBT30-SF6-90CP|Y
01|197476|8|2|NBT30 DualContact Shrink Fit Holder 6mm w/coolant ports|Y
01|197476|10|1|BT30-SF10-65|Y
01|197476|10|2|BT30 10mm 65mm GL shrink fit holder|Y
01|197476|11|1|BT30-SF10-90|Y
01|197476|11|2|BT30 10mm 90mm GL shrink fit holder|Y
01|197476|12|1|NBT30-SF10-65|Y
01|197476|12|2|NBT30 DualContact Shrink Fit Holder 10mm|Y
01|197476|13|1|NBT30-SF10-90CP|Y
01|197476|13|2|NBT30 DualContact Shrink Fit Holder 10mmw/coolant ports|Y
01|197502|1|1|The ANSI-CAT50 Shaft is the drive coupling complete|Y
01|197502|1|2|with machine specific adaption plate curvic-coupling|Y
01|197502|1|3|Customer Provided.|Y
01|197502|1|4|CAT40 Output with Internal and External Coolant supply.|Y
01|197502|1|5|Gear Ratio 1:1 5000 max RPM Torque 450Nm L=252.5mm|Y
01|197502|1|6|Input is reversal to Output adjustable 360 degrees.|Y
01|197514|1|1|RGA#LVR-59567/|Y
01|197514|1|2|Repair of OKEX-ER32Z-MS s/n:AL0076 (Alps#OKA00-21001)|Y
01|197514|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|197514|2|2|replaced. If the spindle can be reused the cost will|Y
01|197514|2|3|be $2636.00|Y
01|197514|4|1|RGA#LVR-59567/|Y
01|197514|4|2|Repair of OKEX-ER32Z-MS s/n:AL0077 (Alps#OKA00-21001)|Y
01|197514|5|1|Bearings o-rings collet nuts and spindle to be|Y
01|197514|5|2|replaced. If the spindle can be reused the cost will|Y
01|197514|5|3|be $2636.00|Y
01|197532|6|1|Martin - Stallion 4/4/20 Tombstone Fixture.|Y
01|197532|6|2|4X20 working surface X4 Flat and Square within .001|Y
01|197532|6|3|No Riser Adapter Needed.|Y
01|197532|9|1|Martin - Stallion 6/6/20 Tombstone Fixture.|Y
01|197532|9|2|6X20 working surface X4-Flat and Square within .001|Y
01|197532|9|3|Riser Adapter Included.|Y
01|197532|12|1|1.25 Thick Baseplate/Sub Plate for Assembly.|Y
01|197532|12|2|Mounting holes and keyways for a NCT200 & TAT170.|Y
01|197537|2|1|Includes a Set of HSK63A Chuck Holders.|Y
01|197550|1|1|SPECIAL DISCOUNT IS FOR DEMO UNIT. SUBJECT TO|Y
01|197550|1|2|PRIOR SALE.|Y
01|197553|2|1|This item is not returnable.|Y
01|197553|2|2|List price from 2010 was $238 Speical Pricing|Y
01|197557|2|1|HSK63A-0625-90|Y
01|197557|2|2|HSK63A Hydraulic Chuck 5/8 GL:90mm|Y
01|197557|5|1|CCNK20-5/8|Y
01|197557|5|2|Depth Adjustable Coolant Collet/Sleeve OD20mm ID5/8|Y
01|197557|6|1|CCK20-5/8|Y
01|197557|6|2|Straight Coolant Collet/Sleeve OD 20mm ID 5/8|Y
01|197557|11|1|HSK63A-HC12-85|Y
01|197557|11|2|HSK63A Hydraulic Chuck 12mm GL:85mm|Y
01|197560|6|1|NBT40-SK20C-90P|Y
01|197560|22|1|replacement for B40-TOOLJAW|Y
01|197564|7|1|BT30-SF3-65|Y
01|197564|8|1|BT30-SF3-90|Y
01|197564|9|1|BT30-SF6-65|Y
01|197564|10|1|BT30-SF6-120|Y
01|197564|11|1|BT30-SF10-65|Y
01|197564|12|1|BT30-SF10-90|Y
01|197574|1|1|Screws for P/N: C4006-0500-4.00|Y
01|197575|2|1|This item is discontinued once ordered cannot be|Y
01|197575|2|2|returned|Y
01|197599|1|1|Balance of 1 pcs ETA 10-12 Weeks|Y
01|197610|2|1|NET pricing|Y
01|197614|8|1|*net price|Y
01|197614|24|1|part of set for NC4007-0016-3.50G|Y
01|197614|25|1|part of set for NC4007-0016-3.50G|Y
01|197619|1|1|CROSS FROM CV40HCTHT0705275|Y
01|197619|2|1|CROSS FROM C40-20ERF400|Y
01|197619|3|1|CROSS FROM C40-20ERF300|Y
01|197619|4|1|CROSS FROM C40-20ERF300|Y
01|197619|5|1|CROSS FROM C40-16ERF500|Y
01|197619|6|1|CROSS FROM C40-16ERF500|Y
01|197619|7|1|CROSS FROM TECHNIKS CAT40xER20-2.76|Y
01|197619|8|1|CROSS FROM TECHNIKS CAT40xER32-2.76|Y
01|197619|9|1|CROSS FROM TECHNIKS CAT40xSLN3/4-3.5|Y
01|197619|10|1|CROSS FROM TECHNIKS CAT40xSLN3/4-1.75|Y
01|197619|11|1|CROSS FROM TECHNIKS CAT40xER16-6|Y
01|197619|12|1|CROSS FROM TECHNIKS CAT40xER25-6|Y
01|197619|13|1|CROSS FROM TECHNIKS CAT40xER32S|Y
01|197619|16|1|CROSS FROM REGOFIX CAT40/ERA32x019|Y
01|197619|17|1|CROSS FROM COMMAND C4E4-0750|Y
01|197639|1|1|We currently have 6 available and balance of 16 knobs|Y
01|197639|1|2|would be 13~14 weeks ARO.|Y
01|197661|1|1|RGA#TOR-59566/|Y
01|197661|1|2|Reapir of E238 s/n:7159|Y
01|197674|1|1|RGA#CUR-59481/|Y
01|197674|1|2|Repair of C40RAM-ER25-215ST s/n:70 703 029 01|Y
01|197674|1|3|(Mimatic#135619)|Y
01|197674|2|1|Bearings seals o-rings damaged input spindle and|Y
01|197674|2|2|housing with damaged bore for bearing to be replaced.|Y
01|197681|3|1|Included with purchase of full installation|Y
01|197681|4|1|Included with purchase of full installation|Y
01|197681|5|1|Included with purchase of full installation|Y
01|197681|6|1|5C-400-HYD Hydraulic collet chuck hyd tube machined|Y
01|197681|6|2|rear bushing.|Y
01|197681|7|1|Hydraulic pump unit: Air/hyd including regulatorfilter|Y
01|197681|7|2|lubricator to feed unitsolenoid valvepressure|Y
01|197681|7|3|regulator and hydraulic hose to the rotary union.|Y
01|197689|1|1|CNC260PYA-M|Y
01|197689|1|2|Air Brake for Haas VF-10 with Sigma 1 Motor|Y
01|197689|1|3|Replacement for CNC200YA on machine currently.|Y
01|197689|3|1|Estimate repair for CNC200FA SN: 8710 for full rebuild|Y
01|197689|3|2|subject to changed based upon arrival of table at|Y
01|197689|3|3|Lyndex-Nikken Facility.|Y
01|197719|3|1|C4007-0032-5.00DIN-M|Y
01|197719|3|2|CAT40 ER20 Collet Chuck High Torque Bearing Nut DIN|Y
01|197719|3|3|modified.|Y
01|197719|4|1|We do not carry an ER20 short gage length so I added|Y
01|197719|4|2|the ER32. These holders cannot be DIN.|Y
01|197719|5|1|C4001-0750-1.75CP-DIN-M|Y
01|197719|5|2|CAT40 Shell Mill Holder 3/4 IdChipHole CoolantPorts|Y
01|197719|5|3|DIN Modified 2 Holes|Y
01|197729|5|1|Note: I have C4006-0250-1.38 currently in stock.|Y
01|197729|5|2|$112.00 list less 46%|Y
01|197738|1|1|RGA#TAR-59591|Y
01|197738|1|2|SN:31465TC|Y
01|197739|1|1|Alps Japan currently has 2 collets in production.|Y
01|197739|1|2|If order is placed right away they can have the collets|Y
01|197739|1|3|in Mid June. If they wait I will need to expedite|Y
01|197739|1|4|delivery again and it could have a much longer lead|Y
01|197739|1|5|time.|Y
01|197743|1|1|P/N: BT40-TB40-300|Y
01|197743|1|2|BT40 Taper Test Bar 300mm g.l.|Y
01|197743|2|1|P/N: PS-881|Y
01|197743|2|2|Pull stud for above|Y
01|197743|2|3|Machine: Makino A40 Pull Studs type NMTZ5001-PSB-25|Y
01|197743|3|1|P/N: BT30-TB40-300|Y
01|197743|3|2|BT30 Taper Test Bar 300mm g.l.|Y
01|197743|4|1|P/N: PS-876|Y
01|197743|4|2|Pull Stud for above Machine: Mazak UN600-30H|Y
01|197743|4|3|Pull Studs type NSTZ5001 S/PSB-30P-F7|Y
01|197746|1|1|for Suncall America|Y
01|197746|1|2|NOTE: Please ship it just before the installation.|Y
01|197746|3|1|Including Oil Change Service Cost|Y
01|197746|5|1|Includes removal of old table CNC170LAA21 and M-code|Y
01|197746|5|2|installation of new CNC180LAA21.|Y
01|197746|5|3|Scheduled for the week of July 10 2023.|Y
01|197751|2|1|**2 free pots supplied with purchase of machine|Y
01|197751|4|1|2 per taper (1 for SF machine and 1 for cooling station|Y
01|197778|1|1|1st Batch/For stock *DWG Saved in Teams File.|Y
01|197778|2|1|1st Batch/For stock *DWG Saved in Teams File.|Y
01|197812|1|1|SK10-0.141A >> Collet (3.5814mm on size)|Y
01|197812|1|2|ALT would be SK10-4 (range: 3.5 ~ 4.0mm)in stock|Y
01|197812|1|3|$67.00 list less 35%.|Y
01|197812|1|4|Quoted as 5~10 pieces MOQ=5-pcs|Y
01|197812|2|1|PMK8-3.6 MMC8/VMC8 Collet 3.6mm|Y
01|197812|2|2|PMK collets has collapsing range 0.2mm and Nikken|Y
01|197812|2|3|offers PMK8-3.6 collet as standard and they have in|Y
01|197812|2|4|stock. 3.6-3.5814mm=0.0186mm|Y
01|197812|2|5|Must have a MMC8 holder for this collet.|Y
01|197812|2|6|Quoted 5~10 pieces.|Y
01|197812|3|1|R8 collet .141 >> Part number TBD. MOQ 5-pcs|Y
01|197846|1|1|Req.INS until tolerance issue gets resolved.|Y
01|197846|2|1|Req.INS until tolerance issue gets resolved.|Y
01|197846|3|1|Req.INS:Need to check dual contact tolerance.|Y
01|197846|4|1|Req.INS:Need to check dual contact tolerance.|Y
01|197846|5|1|Req.INS:Need to check dual contact tolerance.|Y
01|197846|6|1|Req.INS:Need to check dual contact tolerance.|Y
01|197846|7|1|Req.INS:Need to check dual contact tolerance.|Y
01|197867|1|1|CAT40-SF6-80CP-IDI|Y
01|197867|1|2|CAT40 Shrink Fit Holder 6mm Coolant Ports. RFID|Y
01|197867|1|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197867|1|4|Holder and packaging etched with # AC003001|Y
01|197867|2|1|CAT40-SF12-80CP-IDI|Y
01|197867|2|2|CAT40 Shrink Fit Holder 12mm Coolant Ports. RFID|Y
01|197867|2|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197867|2|4|Holder and packaging etched with # AC003005|Y
01|197867|3|1|CAT40-SF0250-3.15CP-IDI|Y
01|197867|3|2|CAT40 Shrink Fit Holder 1/4 Coolant Ports. RFID|Y
01|197867|3|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197867|3|4|Holder and packaging etched with # AC003007|Y
01|197867|4|1|AT40-SF0250-6.30CP-IDI|Y
01|197867|4|2|CAT40 Shrink Fit Holder 1/4 Coolant Ports. RFID|Y
01|197867|4|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197867|4|4|Holder and packaging etched with # AC003008|Y
01|197867|5|1|CAT40-SF0375-3.15CP-IDI|Y
01|197867|5|2|CAT40 Shrink Fit Holder 3/8 Coolant Ports. RFID|Y
01|197867|5|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197867|5|4|Holder and packaging etched with # AC003009|Y
01|197867|6|1|CAT40-SF0375-6.30CP-IDI|Y
01|197867|6|2|CAT40 Shrink Fit Holder 3/8 Coolant Ports. RFID|Y
01|197867|6|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197867|6|4|Holder and packaging etched with # AC003010|Y
01|197867|7|1|CAT40-SF0500-3.15CP-IDI|Y
01|197867|7|2|CAT40 Shrink Fit Holder 1/2 Coolant Ports. RFID|Y
01|197867|7|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197867|7|4|Holder and packaging etched with # AC003011|Y
01|197867|8|1|CAT40-SF0625-3.15CP-IDI|Y
01|197867|8|2|CAT40 Shrink Fit Holder 5/8 Coolant Ports. RFID|Y
01|197867|8|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197867|8|4|Holder and packaging etched with # AC003013|Y
01|197867|9|1|CAT40-SF0750-6.30CP-IDI|Y
01|197867|9|2|CAT40 Shrink Fit Holder 3/4 Coolant Ports. RFID|Y
01|197867|9|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197867|9|4|Holder and packaging etched with # AC003015|Y
01|197867|10|1|CAT40-SF25-100CP-IDI|Y
01|197867|10|2|CAT40 Shrink Fit Holder 25mm Coolant Ports RFID|Y
01|197867|10|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197867|10|4|Holder and packaging etched with # AC003016|Y
01|197870|1|1|CAT40-SF12-80CP-IDI|Y
01|197870|1|2|CAT40 Shrink Fit Holder 12mm Coolant Ports. RFID|Y
01|197870|1|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|197870|1|4|Holder and packaging etched with # AC003005|Y
01|197910|1|1|Back up screw cannot be used for GL90mm.|Y
01|197918|1|1|Replacement for unrepairable RGA# LVR-59590|Y
01|197918|1|2|Inspection fee waived for unrepairable if new purchased|Y
01|197930|1|1|INSTALLATION & TRAINING OF E460N PRESETTER|Y
01|197942|1|1|This item is special once ordered cannot be cancelled|Y
01|197942|1|2|or returned.|Y
01|197942|2|1|This item is special once ordered cannot be cancelled|Y
01|197942|2|2|or returned. Net price has been quoted no further|Y
01|197942|2|3|discount should be taken.|Y
01|197967|1|1|Non-standard stock and considered specials|Y
01|197967|1|2|These cannot be cancelled or returned|Y
01|197980|1|1|*NET PRICE|Y
01|198011|1|1|ref# H037M10|Y
01|198011|1|2|Includes: Std. Soft Jaws with bolts hex wrench|Y
01|198011|1|3|**draw nut is blank|Y
01|198011|6|1|LYN will thread the draw nut upon receipt of machine|Y
01|198011|6|2|specs|Y
01|198020|2|1|Net Pricing|Y
01|198020|3|1|Net Pricing|Y
01|198020|4|1|Net Pricing|Y
01|198034|6|1|*Alt for 9/64 non-coolant|Y
01|198042|1|1|CKFN32(1.1/4T)-20C|Y
01|198042|2|1|CKFN32(1.1/4T)-25C|Y
01|198044|1|1|*std with blank draw screw|Y
01|198044|4|1|*std with blank draw screw|Y
01|198044|6|1|*For either chuck if the customer would like us|Y
01|198044|6|2|to thread the draw screw|Y
01|198044|6|3|*delivery is upon receipt of lathe info|Y
01|198044|6|4|**NET price|Y
01|198049|10|1|BT40-SK10F-120P-M|Y
01|198049|10|2|Hi-Speed|Y
01|198071|2|1|C for chip hole|Y
01|198092|1|1|This item is discontinued and cannot be returned.|Y
01|198101|1|1|for Suncall America|Y
01|198101|1|2|NOTE: Please ship it just before the installation.|Y
01|198102|1|1|Including Oil Change Service Cost|Y
01|198103|1|1|Includes removal of old table CNC170LAA21 and M-code|Y
01|198103|1|2|installation of new CNC180LAA21.|Y
01|198103|1|3|Scheduled for the week of July 10 2023.|Y
01|198108|1|1|This item is not returnable|Y
01|198129|3|1|Delivery = pending machine measurements|Y
01|198172|1|1|M7HZ-70V(M3)|Y
01|198185|2|1|ER32 X ICE LT BMT55 ER32 1:1 10000rpm for TM-4000Y2|Y
01|198185|2|2|Special Order. Net Price Each. MOQ: 5|Y
01|198185|2|3|Mimatic ID# 201767|Y
01|198185|3|1|ER32 Z ICE LT BMT55 ER32 1:1 6500rpm for TM-4000Y2|Y
01|198185|3|2|Special Order. Net Price Each. MOQ: 5|Y
01|198185|3|3|Mimatic ID#: 201769|Y
01|198185|7|2|SK20 X ICE LT BMT55 ER32 1:1 10000rpm for TM-4000Y2|Y
01|198185|7|3|Special Order. Net Price Each. MOQ: 5|Y
01|198185|7|4|Mimatic ID#: 201768|Y
01|198185|8|2|SK20 Z ICE LT BMT55 ER32 1:1 6500rpm for TM-4000Y2|Y
01|198185|8|3|Special Order. Net Price Each. MOQ: 5|Y
01|198185|8|4|Mimatic ID#: 201770|Y
01|198189|1|1|to hold .275|Y
01|198193|1|1|MNL12-ER25-AD-ICE Mori Live ER25 STRT Adjustable|Y
01|198196|1|1|C5006-1250-4.00CP-M|Y
01|198196|1|2|CAT50 1.1/4 End Mill Holder w/ 4 gage length|Y
01|198196|1|3|MODIFICATION-CP  with Coolant Ports|Y
01|198207|1|1|Customer must supply two inserts to Nikken Japan|Y
01|198207|1|2|to have installed on special boring head at factory.|Y
01|198207|1|3|insert:  TCS-466CD-B|Y
01|198207|1|4|insert:  TCS-483D|Y
01|198207|1|6|Delivery is 3weeks upon receipt at factory of customers|Y
01|198207|1|7|chips.|Y
01|198207|1|8|Contact LYN for RGA# to send in the inserts.|Y
01|198215|1|1|P/N: TBD|Y
01|198215|1|2|Tool Holder Capto C5; coolant supply through spindle|Y
01|198215|1|3|and via injection tube; filter fineness: max. 0.05mm|Y
01|198215|1|4|constant dry run possible with sufficient cooling phase|Y
01|198215|1|5|max. mold temperature 90C: no reversal of direction of|Y
01|198215|1|6|rotation (drive direction equal to output direction)|Y
01|198215|1|7|L1=109mm; Gear ratio:i(n1/n2)=2.5:1; max. coolant|Y
01|198215|1|8|pressure: p(max)= 70bar; max. torque M(max)=200Nm|Y
01|198215|1|9|max. input speed: nl(max)=5.000RPM|Y
01|198215|2|1|P/N: TBD|Y
01|198215|2|2|Drive Shaft SK50 accoring to ISO7388-1 -->|Y
01|198215|2|3|(forner DIN 69871) complete with standard torque|Y
01|198215|2|4|support according to ISO 9524 and locking device|Y
01|198215|2|5|(without machine-side stop block)> to be adapted to the|Y
01|198215|2|6|BAZ by the customer  For a stable and rigid mounting of|Y
01|198215|2|7|the angle head to the machine we strongly recommend a|Y
01|198215|2|8|3-point support adapted to the machine. Otherwise no|Y
01|198215|2|9|guarantee can be given for any stability problems.|Y
01|198215|2|10|A=80mm / d=18mm|Y
01|198222|2|1|Included with full installation|Y
01|198222|3|1|Included with full installation|Y
01|198222|4|1|Included with full installation|Y
01|198222|5|1|Included with full installation|Y
01|198222|7|1|Northfiled 5C pneumatic chuck with center thru coolant|Y
01|198222|7|2|for chip flushing|Y
01|198222|7|3|5C-600W model|Y
01|198230|1|1|Mimatic Part # 162717|Y
01|198230|1|2|CAT40; AGH; ER25; ADJUSTABLE 0-98DEG; ER25; A=65mm;|Y
01|198230|1|3|NO COOLANT; L=195mm; L1=96mm;|Y
01|198230|1|4|1:2.25 GEAR; MAX IN 6000RPM; MAX OUT 13500RPM;|Y
01|198230|1|5|Includes wrenches|Y
01|198230|2|1|Mimatic Part # 162717|Y
01|198230|4|1|Does not include wrenches|Y
01|198230|5|1|Does not include wrenches|Y
01|198261|1|1|CNC321BFA-8PRJ|Y
01|198261|1|2|Ref S#15751 Special table for Aisin|Y
01|198261|1|3|Quoted as net pricing|Y
01|198261|1|4|Non cancellable Non returnable after receiving the PO|Y
01|198266|1|1|HSK125A-SF1000-4.00|Y
01|198266|2|1|HSK125A-SF0750-4.00|Y
01|198266|3|1|HSK100A-SF0750-4.00|Y
01|198266|4|1|HSK100A-SF1000-4.00|Y
01|198269|3|1|2033-2000 PRATT BURNERD AMERICA 20 3-JAW HIGH|Y
01|198269|3|2|PRECISION STEEL BODY SCROLL CHUCK|Y
01|198269|3|3|TWO-PIECE STANDARD TONGUE/GROOVE JAWS|Y
01|198269|3|4|NITRIDE HARDENED AND GROUND SCROLL|Y
01|198269|3|5|INCLUDES ADAPTER PLATE & MOUNTING HARDWARE|Y
01|198269|5|1|PVC COATED 3.5M EXTERNAL POWER/FEEDBACK CABLES FOR|Y
01|198269|5|2|4TH AXIS ON OKUMA MILLAC 1052VE X 3000|Y
01|198280|1|1|8.07 THROUGH HOLE|Y
01|198280|6|1|TMX 16 CHICK BIG BORE 3-819-1600P|Y
01|198280|6|2|WITH ADAPTER PLATE|Y
01|198280|8|1|50MM RISER FOR TAT-401 TO MATCH CNCB450 CENTER HEIGHT|Y
01|198280|9|1|$10000 TOOLING CERTIFICATE|Y
01|198281|6|1|SPECIAL ORDER - NONCANCELABLE/NONRETURNABLE|Y
01|198298|3|1|PRICING INCLUDES ADAPTER PLATE AND MOUNTING HARDWARE|Y
01|198298|4|1|PRICING INCLUDES BACK-SIDE ADATPER FOR ROTARY MOUNT|Y
01|198303|4|1|REPLACES SKN-10B|Y
01|198329|9|1|Remote Training - $150.00/Hour with a 4 Hour Minimum.|Y
01|198335|1|1|P/N: BMT85-ER50Z-85|Y
01|198335|1|2|BMT85 Live 90 Deg Head: ER50; ExtCoolant; L1=85mm;|Y
01|198335|1|3|1:1 Gear;Max 6000RPM; Max 150Nm; wrenches not included|Y
01|198350|1|1|1st Batch/948854 Drillmex|Y
01|198350|2|1|1st Batch/948854 Drillmex|Y
01|198350|3|1|1st Batch/941745 Butler/Dearborn 3/10:DWG Approved/Cust|Y
01|198364|1|1|RGA#LVR-59596/|Y
01|198364|1|2|Repair of BMT45-ER25Z s/n:92124 01 (Mimatic#176866)|Y
01|198364|2|1|Bearings seals o-rings and coolant bushings to be|Y
01|198364|2|2|replaced.|Y
01|198370|1|1|RGA#CUR-59612/|Y
01|198370|1|2|Repair of C40RAM-ER25-180TS-65TP s/n:8815401|Y
01|198370|1|3|(Mimatic#178158)|Y
01|198370|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|198370|2|2|2 ER spindles.|Y
01|198380|3|1|Installation includes: Drive unit short bar fiber|Y
01|198380|3|2|optic cable communications cable bulkhead cables|Y
01|198380|3|3|external cables parameter changes service time and|Y
01|198380|3|4|travel.|Y
01|198380|7|1|Installation includes: Drive unit short bar fiber|Y
01|198380|7|2|optic cable communications cable bulkhead cables|Y
01|198380|7|3|external cables parameter changes service time and|Y
01|198380|7|4|travel.|Y
01|198390|3|1|Special cannot be cancelled or returned.|Y
01|198392|6|1|Coolant Port not available|Y
01|198392|7|1|Coolant Port not available|Y
01|198392|8|1|Coolant Port not available|Y
01|198392|9|1|Coolant Port not available|Y
01|198392|12|1|Jet slots available|Y
01|198392|38|1|*Updated part# for C5017-0016-6.00|Y
01|198392|38|2|No IDchip hole on ER chuck|Y
01|198402|2|1|**** No Safety Recess. Body may interfere with ATC Arm.|Y
01|198412|3|1|MAZAK ISO40-ISO50 MAGNETIC CHIP TOOLHOLDER STATION|Y
01|198440|6|1|**Collet is non-standard stock-can not be cancelled or|Y
01|198440|6|2|returned|Y
01|198447|1|1|**SPECIAL- Cannot be returned**|Y
01|198474|3|1|Master Gauge at AHB Roseville Location|Y
01|198483|2|1|Extra Service Cost.|Y
01|198483|2|2|This item will be charged for each additional day of|Y
01|198483|2|3|check-up service.|Y
01|198486|1|1|RGA#TAR-59615|Y
01|198486|1|2|5AX-200TD SN:1690|Y
01|198486|36|1|REGRIND|Y
01|198491|2|1|Please Note: The SK16-6AC is no charge if purchased|Y
01|198491|2|2|the above Bullseye set.|Y
01|198518|2|1|LYN to make position block. Delivery is 1 week from|Y
01|198518|2|2|receipt of PO upon receipt of spindle drawing specs|Y
01|198518|2|3|NET price|Y
01|198537|3|1|Included with R-8-SP-SET for NCT200EFA-M|Y
01|198539|2|1|Extra Service Cost.|Y
01|198539|2|2|This item will be charged for each additional day of|Y
01|198539|2|3|check-up service.|Y
01|198544|1|1|BT50-C25-200|Y
01|198544|1|2|BT50 25mm Milling Chuck w/ 200mm gage length|Y
01|198544|1|3|**NET PRICE|Y
01|198544|1|4|**Special- cannot be returned or cancelled|Y
01|198556|1|1|Includes 6 port rotary union|Y
01|198556|3|1|Includes 6 Port Rotary Union|Y
01|198556|3|2|**** WH2 Table - Discounted accordingly|Y
01|198563|2|1|LYN to make block upon spindle drawing confirmation|Y
01|198599|1|1|includes: PRE-E236N-DPP Data Post Processing|Y
01|198599|17|1|Install and Training for Hathor6A|Y
01|198599|18|1|Install and Training for E236PLUS|Y
01|198599|19|1|Install and Training for E346PLUS|Y
01|198606|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|198606|3|2|STANDARD PVC WRAPPED CABLE SET FOR OKUMA M460V|Y
01|198612|1|1|BT50-C25-200|Y
01|198612|1|2|BT50 25mm Milling Chuck w/ 200mm gage length|Y
01|198612|1|3|**NET PRICE|Y
01|198612|1|4|**Special- cannot be returned or cancelled|Y
01|198614|2|1|POSITIONING BLOCK FOR CAT40 HAAS|Y
01|198634|1|1|Lyndex-Nikken Part # TBD / Mimatic Part Number 102771|Y
01|198634|1|2|Shank VDI 40 similar DIN ISO 10889 (DIN69880) S1=xx|Y
01|198634|1|3|Drive Twoflat AF xxmm tooling interface for collet|Y
01|198634|1|4|system ER32 (1.0-20.0 mm) according DIN 6499 external|Y
01|198634|1|5|no reversal of rotation Drive direction equal Output|Y
01|198634|1|6|direction.L=108mmgear ratio:1:1max. torque: 25Nm|Y
01|198634|1|7|max. ingoing revolution: nl(max)= 6000rpmmax. outgoing|Y
01|198634|1|8|revolution: n2(max)= 6000rpmsimilar mimatic drawing #|Y
01|198634|1|9|#00014873 weight around. 12 kg|Y
01|198634|2|1|Lyndex-Nikken Part # TBD / Mimatic Part Number 102771|Y
01|198634|2|2|Price for 2 live tools.|Y
01|198647|1|1|ZQ35-12|Y
01|198647|2|1|ZKG12-1/8R|Y
01|198700|1|1|HSK50 Test Bar|Y
01|198708|1|1|1st Batch|Y
01|198708|3|1|Req.INS/Install E25-NUT|Y
01|198708|4|1|Req.INS/T/P Inspection Required|Y
01|198708|5|1|Req. INS/T/P Inspection Required|Y
01|198708|6|1|Req. INS/T/P Inspection Required|Y
01|198708|7|1|Req.INS/T/P Inspection Required|Y
01|198708|8|1|1st Batch *10/24/DWG Aapproved|Y
01|198708|9|1|Req.INS/T/P Inspection Required|Y
01|198708|10|1|Req.INS/T/P Inspection Required|Y
01|198708|11|1|Req. INS Install E16-NUT-G in house/For stock|Y
01|198709|1|1|THIS TABLE WILL COME SET UP WITH HYDRAULIC BRAKE|Y
01|198709|3|1|BRAIDED STAINLESS STEEL COVERED EXTERNAL POWER &|Y
01|198709|3|2|FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|198709|3|3|PVC COATED CABLES ARE FREE WITH TABLE; UPCHARGE|Y
01|198709|3|4|APPLIED TO THE STAINLESS CABLES. THEY ARE 6-8 WEEK|Y
01|198709|3|5|DELIVERY FROM OKUMA.|Y
01|198713|1|1|ZQ35-12|Y
01|198713|3|1|ZKG12-1/8R|Y
01|198733|9|1|A tariff surcharge may be added to this quotation in|Y
01|198733|9|2|the event of a sustained tariff increase on the|Y
01|198733|9|3|importation of this product.  Any surcharge will be|Y
01|198733|9|4|disclosed prior to acceptance of an order.|Y
01|198735|1|1|THIS TABLE WILL COME SET UP WITH HYDRAULIC BRAKE|Y
01|198735|3|1|BRAIDED STAINLESS STEEL COVERED EXTERNAL POWER &|Y
01|198735|3|2|FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|198735|3|3|PVC COATED CABLES ARE FREE WITH TABLE; UPCHARGE|Y
01|198735|3|4|APPLIED TO THE STAINLESS CABLES. THEY ARE 6-8 WEEK|Y
01|198735|3|5|DELIVERY FROM OKUMA.|Y
01|198749|1|1|No INS needed/Cheersun BOAT #05152301-B|Y
01|198749|2|1|No INS needed/Cheersun BOAT #05152301-B|Y
01|198749|3|1|No INS needed/Cheersun BOAT #05152301-B|Y
01|198749|4|1|No INS needed/Cheersun BOAT #05152301-B|Y
01|198749|5|1|No INS needed/Cheersun BOAT #05152301-B|Y
01|198749|6|1|No INS needed/Cheersun BOAT #05152301-B|Y
01|198749|7|1|No INS needed/Cheersun BOAT #05152301-B|Y
01|198749|8|1|No INS needed/Cheersun BOAT #05152301-B|Y
01|198749|9|1|No INS needed/Cheersun BOAT #05152301-B|Y
01|198766|1|1|RGA#LVR-59313/|Y
01|198766|1|2|Repair of MNL12-ER32Z-MS s/n: A1984 (Alps#T32216)|Y
01|198766|2|1|Bearings o-rings collet nuts and gears to be replaced|Y
01|198769|1|1|BT50-C25-200|Y
01|198769|1|2|BT50 25mm Milling Chuck w/ 200mm gage length|Y
01|198769|1|3|**NET PRICE|Y
01|198769|1|4|**Special- cannot be returned or cancelled|Y
01|198777|1|1|BT50-C25-200|Y
01|198777|1|2|BT50 25mm Milling Chuck w/ 200mm gage length|Y
01|198777|1|3|**NET PRICE|Y
01|198777|1|4|**Special- cannot be returned or cancelled|Y
01|198780|1|1|RGA#LVR-59622/|Y
01|198780|1|2|Repair of MZMP47-ER32Z-ICE s/n:189011590 14|Y
01|198780|1|3|(Mimatic#124864)|Y
01|198780|2|1|Bearings seals o-rings ER32 spindle bevel gearset|Y
01|198780|2|2|and input spindle to be replaced.|Y
01|198780|4|1|RGA#LVR-59622/|Y
01|198780|4|2|Repair of MZMP47-ER32Z-ICE s/n:20901701 09|Y
01|198780|4|3|(Mimatic#124864)|Y
01|198780|5|1|Bearings seals o-rings and damaged ER32 housing to be|Y
01|198780|5|2|replaced.|Y
01|198780|7|1|RGA#LVR-59622/|Y
01|198780|7|2|Repair of MZMP47-ER32Z-ICE s/n:91739 04|Y
01|198780|7|3|(Mimatic#124864)|Y
01|198780|8|1|Bearings seals orings and ER32 spindle to be replaced|Y
01|198780|10|1|RGA#LVR-59622/|Y
01|198780|10|2|Repair of MZMP47-ER32Z-ICE s/n:86648 04|Y
01|198780|10|3|(Mimatic#124864)|Y
01|198780|11|1|Bearings seals o-rings ER32 spindle & input spindle|Y
01|198780|11|2|to be replaced.|Y
01|198782|1|1|CAT40-SF1000-3.94CP-IDI|Y
01|198782|1|2|AC003017 RFID BIS-C-122-04/L installed and holder|Y
01|198782|1|3|re-balanced. Holder and packaging etched with AC003017|Y
01|198784|1|1|Part# HSK100A-ER40-120BN|Y
01|198784|1|2|HSK100A ER40 Collet Chuck w/ Bearing Nut gage length|Y
01|198784|1|3|120mm|Y
01|198795|1|1|1st Batch/941767 Addy/Mersen 3/21:DWG Approved/Customer|Y
01|198806|1|1|1st Batch|Y
01|198806|2|1|1st Batch|Y
01|198812|4|1|8+1 2500PSI rotary union|Y
01|198812|5|1|INCLUDES TRAVEL & LABOR FOR L-N SERVICE TECHNICIAN|Y
01|198812|5|2|TO BE PRESENT FOR ROTARY TABLE INSTALLATION|Y
01|198817|3|1|Quoted at NET price|Y
01|198827|1|1|TAT-170 SN: NA|Y
01|198827|1|2|TAR-59691|Y
01|198844|1|1|OKL3-ER32Z X 2-Pcs $1713.00 list less 30% in stock.|Y
01|198844|5|1|OKL3-ER32Z-ICE X 2-pcs $3284.00 list less 30% stock.|Y
01|198852|1|1|Includes external cables|Y
01|198852|5|1|12 3 Jaw Big Bore Chuck Package with 5.71 Thru-Hole|Y
01|198852|5|2|Complete with adapter plate chuck and hardware|Y
01|198862|7|1|BT40-Q20-80|Y
01|198863|1|1|special order non-cancelable/non-returnable|Y
01|198883|1|1|C4017-0020-4.00|Y
01|198883|2|1|C4016-0375-4.00|Y
01|198883|3|1|C4016-0500-4.00|Y
01|198883|5|1|C4016-0250-4.00|Y
01|198892|1|1|This item is not returnable.|Y
01|198916|26|1|currently 13 pieces in stock stock also in Japan|Y
01|198916|26|2|2-3 weeks ARO for pieces coming in from Japan|Y
01|198916|33|1|Direct Replacement for SKN-10BJ|Y
01|198916|51|1|Direct Replacement for SKN-10BJ|Y
01|198916|52|1|Direct Replacement for SKN-10B|Y
01|198916|56|1|Direct Replacement for SKN-6WB|Y
01|198916|58|1|Replacement for ER8-EXT-500|Y
01|198916|59|1|There are currently 4 pieces in stock remaining pieces|Y
01|198916|59|2|will take 2-3 weeks ARO|Y
01|198916|60|1|There are currently 4 pieces in stock remaining pieces|Y
01|198916|60|2|will take 2-3 weeks ARO|Y
01|198916|66|1|3 in stock 2-3 Weeks ARO to bring in remainging pieces|Y
01|198916|66|2|from Japan|Y
01|198916|81|1|Direct replacement for SKN-6WBJ|Y
01|198916|86|1|Special order non-cancelable/non-returnable|Y
01|198916|95|1|Not available in coolant sealed|Y
01|198916|97|1|not available in coolant sealed|Y
01|198916|100|1|not available in coolant sealed|Y
01|198916|108|1|Direct Replacement for SKN-6WBJ|Y
01|198924|1|1|Replacement to SN: 1690|Y
01|198924|1|2|Price includes Built in RJ.|Y
01|198924|1|3|** special - not cancellable/returnable **|Y
01|198930|1|1|Special- cannot be cancelled or returned|Y
01|198930|1|2|Quoted at NET price|Y
01|198934|4|1|This item is special once ordered cannot be cancelled|Y
01|198934|4|2|or returned. Net price has been quoted.|Y
01|198934|6|1|This item is special once ordered cannot be cancelled|Y
01|198934|6|2|or returned|Y
01|198934|10|1|HSK63A-C16-120G|Y
01|198934|10|2|This item is special once ordered cannot be cancelled|Y
01|198934|10|3|or returned.|Y
01|198934|12|1|Part #CKFN16-16DC|Y
01|198934|12|2|This item is special and cannot be cancelled or|Y
01|198934|12|3|returned.|Y
01|198934|13|1|This item is special once ordered cannot be cancelled|Y
01|198934|13|2|or returned.|Y
01|198936|1|1|IT50-C32-165 >> IT50 32mm Milling Chuck w/165mm gage|Y
01|198936|1|2|length.|Y
01|198936|1|3|QUOTED AT NET PRICING|Y
01|198946|3|1|BT50-SK20-200|Y
01|198971|1|1|NET PRICE|Y
01|198972|1|1|**NET PRICE|Y
01|198973|1|1|HSK160B ER40 Collet chuck 6 GL|Y
01|198973|1|2|Part # HSK160B-ER40-6.00|Y
01|198973|1|3|6 piece price = $2193.00 net each|Y
01|198981|1|1|part# HSK63A-SK6-60-IDU|Y
01|198981|1|2|HSK63A SK6 Collet Chuck w/ Chip ID Hole|Y
01|198983|1|1|RGA#TAR-59694|Y
01|198983|1|2|CNC260MA SN:3748|Y
01|198983|17|1|NEW WIREHARNESS|Y
01|198992|1|1|Delivery is approximately 1 year ARO plus 2-3 months|Y
01|198992|1|2|for Boat Shipping.|Y
01|198994|3|1|This item is a non-standard stock item and is|Y
01|198994|3|2|considered special. Once an order is placed it cannot|Y
01|198994|3|3|be cancelled or returned|Y
01|199046|1|1|TAM271851-59|Y
01|199052|1|1|TABLE COMES WITH T-SLOTTED FACEPLATE & OKUMA MOTOR|Y
01|199052|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|199052|3|2|PVC COATED CABLE SET INCLUDED AT NO COST W/ TABLE|Y
01|199055|1|1|TABLE COMES WITH T-SLOTTED FACEPLATE & OKUMA MOTOR|Y
01|199055|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|199055|3|2|PVC COATED CABLE SET INCLUDED AT NO COST W/ TABLE|Y
01|199059|3|1|Installation includes: Drive unit short bar fiber|Y
01|199059|3|2|optic cables communications cables external cables|Y
01|199059|3|3|parameter changes service time and travel.|Y
01|199062|1|1|1st Batch/Mimatic Standard/949399 Unverferth Mfg|Y
01|199066|1|1|Includes cables.|Y
01|199069|1|1|Lyndex Nikken Part # MZST68-C4Z-ICE  Mim# 196996|Y
01|199069|1|2|Mazak Live CAPTO 4 Z-Axis 90Deg Horizontal|Y
01|199069|1|3|IntExtCoolant 7MP|Y
01|199069|1|4|Mimatic part # 196996|Y
01|199076|1|1|1st Batch *10/24 DWG ApprovedMFG2/28>6/30#2UPD4/28>>6/|Y
01|199076|2|1|Req.INSMFG4/E>4/28#8UPD3/22|Y
01|199076|3|1|Req.INS/T/P Inspection Required(2)6/B A (17)8/B~M B (1|Y
01|199076|4|1|Req.INS/T/P Inspection RequiredMFG4/30UPD3/20>>(8)5/5A|Y
01|199076|5|1|Req.INS/T/P Inspection RequiredMFG4/30UPD4/28>>(7)6/B|Y
01|199076|6|1|Req.INS/T/P Inspection Required(5)AIR (4)7/M B (2)5/5A|Y
01|199076|7|1|Req.INS/T/P Inspection Required8/B~M B|Y
01|199076|8|1|Req.INS/T/P Inspection RequiredMFG3/15>5/30#3UPD4/28>>|Y
01|199076|9|1|Req.INS E16-NUT for PO52652-100/IT0703-20/IT0705-80|Y
01|199081|4|1|Please Note: We only have 12 holders in stock.|Y
01|199099|3|1|MZMP46-STC4X-R|Y
01|199099|4|1|MZMP46-STC4Z-R|Y
01|199099|10|1|MZMP47-CAPTO4X-STATI  (MZMP47-STC4X-R)|Y
01|199099|11|1|MZMP47-CAPTO4Z-STATI  (MZMP47-STC4Z-R)|Y
01|199117|1|1|Package includes: Table with motor AA21 control box|Y
01|199117|1|2|pendant with 15 cable exteral cable from the table|Y
01|199117|1|3|to the control box M-code cable and controller power|Y
01|199117|1|4|cable.|Y
01|199124|1|1|Please note that the positioning pin unlock height|Y
01|199124|1|2|be different from the original C40RA-0025|Y
01|199124|1|3|angle head the end user has.|Y
01|199124|1|4|They should double check the unlock position before|Y
01|199124|1|5|loading it into the machine with their current|Y
01|199124|1|6|positioning block.|Y
01|199136|1|1|This item is non-standard stock and considered special.|Y
01|199136|1|2|Once an order is placed it may not be cancelled or|Y
01|199136|1|3|returned. Delivery is 8-10wks MFG and after approval|Y
01|199136|1|4|drawing has been signed and returned. Please allow|Y
01|199136|1|5|additional time for the approval drawing process.|Y
01|199153|1|1|Package includes: Table with motor AA21 control box|Y
01|199153|1|2|pendant with 15 cable exteral cable from the table|Y
01|199153|1|3|to the control box M-code cable and controller power|Y
01|199153|1|4|cable.|Y
01|199153|3|1|x1 M-code air and power for controller required|Y
01|199153|3|2|on the machine side|Y
01|199197|1|1|C8-Blankbar w/ 22-23 gauge length & 2 diameter|Y
01|199200|2|1|No charge included in the price of the SF machine.|Y
01|199206|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|199207|1|1|Please Note: Price includes the shrink fit machine|Y
01|199207|1|2|accessories and 15 standard CAT50 shrink fit holders|Y
01|199207|1|3|with less than 6.00 gage length mix or match.|Y
01|199207|2|1|No charge included in the price of the SF machine.|Y
01|199208|1|1|CNC601 PRICED LIKE A CNC501; SPECIAL PRICING|Y
01|199208|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|199210|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|199227|1|1|P/N: MZMP5-C5X-OFF-ICE|Y
01|199227|1|2|Mazak W300 Capto 5 X-axis Vertical live tool w/|Y
01|199227|1|3|IntCoolantExtCoolant CAN RUN DRY 24/7|Y
01|199227|2|1|P/N: MZMP5-C5Z-ICE|Y
01|199227|2|2|Mazak W300 Capto 5 Z-axis Horizontal live tool|Y
01|199234|7|1|*SP NET PRICE|Y
01|199235|2|1|Includes all needed components and removal of existing|Y
01|199235|2|2|rotary interface.|Y
01|199236|2|1|Configured and used for table braking systems|Y
01|199236|3|1|Includes all needed components and removal of existing|Y
01|199236|3|2|rotary interface.|Y
01|199259|1|1|This item is special. Once ordered cannot be cancelled|Y
01|199259|1|2|or returned.|Y
01|199269|1|1|Special non-cancelable/non-returnable|Y
01|199279|7|1|This size is considered special. Once ordered it cannot|Y
01|199279|7|2|be cancelled or returned.|Y
01|199279|48|1|This item is considered special once ordered cannot be|Y
01|199279|48|2|cancelled or returned.|Y
01|199281|1|1|RGA#TAR-59689|Y
01|199281|1|2|5AX-201YA  SN:5780|Y
01|199283|1|1|ETA for additional pieces is 10-12 wks ARO|Y
01|199351|5|1|10% extra has been added to the discount Eastec Promo.|Y
01|199351|5|2|Offer is valid through July 21st.|Y
01|199352|6|1|Justin to do installation and training at no charge.|Y
01|199358|5|1|TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|199358|5|2|LIMITED TO A MAXIMUM OF 4 PEOPLE.|Y
01|199359|5|1|TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|199359|5|2|LIMITED TO A MAXIMUM OF 4 PEOPLE.|Y
01|199360|4|1|INCLUDES CUSTOM SOFTWARE FOR CNC CONTROLLER|Y
01|199360|7|1|TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|199360|7|2|LIMITED TO A MAXIMUM OF 4 PEOPLE.|Y
01|199361|16|1|Install and Training for E236PLUS/E346VPLUS|Y
01|199362|4|1|TCE-A7088 Power cable for CNC202LFA|Y
01|199362|5|1|TCE-96743 Feedback cable for CNC202LFA|Y
01|199362|9|1|*Base plate by aluminum was supplied from the customer|Y
01|199362|9|2|last time|Y
01|199362|17|1|Air freight for CNC202 and parts|Y
01|199362|18|1|Air freight for 5AX-4MT and parts|Y
01|199367|1|1|without drive pins|Y
01|199374|2|1|EXTERNAL POWER/FEEDBACK CABLES 4TH AXIS|Y
01|199374|2|2|***CABLE LENGTH TO BE PROVIDED BY MORRIS SOUTH|Y
01|199375|2|1|EXTERNAL POWER/FEEDBACK CABLES 4TH AXIS|Y
01|199375|2|2|***CABLE LENGTH TO BE PROVIDED BY MORRIS SOUTH|Y
01|199393|3|1|Special motor flange|Y
01|199393|4|1|Special motor gear|Y
01|199400|1|1|RGA#TOR-59679/|Y
01|199400|1|2|Repair of SF-START2-UNIT-200 s/n:2J272|Y
01|199416|1|1|This item is considered special. Once ordered it cannot|Y
01|199416|1|2|be returned.|Y
01|199421|1|1|Quoted at NET pricing|Y
01|199450|1|1|CAT40-AF1-30-OH|Y
01|199450|1|2|CAT40 Main Arbor (Back Spot Facing Arbor)|Y
01|199474|1|1|This item is considered special. Once we modify to add|Y
01|199474|1|2|DIN Coolant this cannot be cancelled or returned.|Y
01|199505|1|1|*NET PRICE - Special|Y
01|199508|1|1|This is considered special once ordered it cannot be|Y
01|199508|1|2|cancelled or returned.|Y
01|199508|4|1|This is considered special once ordered it cannot be|Y
01|199508|4|2|cancelled or returned|Y
01|199510|1|1|OP10  Lyndex Part #TBD (HOWA# H011MC8 O-****)|Y
01|199510|1|2|Special Chuck for EI550 OP10|Y
01|199510|1|3|MOQ - 2 pcs|Y
01|199510|1|4|4pc price = $13462 net each|Y
01|199510|2|1|Lyndex Nikken Part #TBD (HOWA# C1SB125-B)|Y
01|199510|2|2|Hyd Cylinder for EI550 OP10|Y
01|199510|2|3|No volume discount on this item|Y
01|199510|3|1|OP20   Lyndex Nikken part#TBD (HOWA# H011MC8 O-****)|Y
01|199510|3|2|Special Chuck for EI550 OP20|Y
01|199510|3|3|MOQ - 2 pc|Y
01|199510|3|4|4pc = $15625 net ea.|Y
01|199510|4|1|Lyndex Nikken Part# TBD (HOWA# C1SB125-B)|Y
01|199510|4|2|Hyd Cylinder for EI550 OP20|Y
01|199510|4|3|No volume discount on this item|Y
01|199511|1|1|Keiji/For PMTS and other shows.|Y
01|199511|2|1|Keiji/For PMTS and other shows.|Y
01|199522|1|1|RGA#TAR-59720|Y
01|199522|1|2|CNC202FA-M  SN:40167TC|Y
01|199524|1|1|Elbo Part# 04B185|Y
01|199524|1|2|Desc: ISO 40 / ISO 30 cone reduction adapter.|Y
01|199533|1|1|Cost is set for order of 1pc or 20pcs.|Y
01|199533|1|2|There are 8pcs in stock in IL able to ship within 24|Y
01|199533|1|3|hours after receipt of PO.|Y
01|199547|1|1|RGA#LVR-59645/|Y
01|199547|1|2|Repair of MNL12-ER25Z-MSD s/n:A0011 (Alps#MSA01-6L000)|Y
01|199547|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|199547|2|2|replaced. If the spindle can be reused the cost will|Y
01|199547|2|3|be $3524.80|Y
01|199558|3|1|Includes: Travel and Labor for Installing rotary table|Y
01|199558|3|2|trunnion assembly on a HAAS VF2SS and any components|Y
01|199558|3|3|required for installation EXCEPT ANY NEEDED OPTIONS|Y
01|199558|3|4|FROM HAAS (3rd Party Software Option)|Y
01|199558|3|5|THIS IS A FLAT NET COST - Please pass through to cust.|Y
01|199558|4|1|****NEEDED COMPONENT FOR ANY BELOW TRUNNION OPTIONS****|Y
01|199558|8|1|Standard trunnion plate with grid of 1/2-13 threaded|Y
01|199558|8|2|inserts and .501 ID hardened bushings.  Both Sides|Y
01|199558|9|1|Standard tombstone with grid pattern of 1/2-13 threaded|Y
01|199558|9|2|inserts and .501 ID hardened bushings. All Sides.|Y
01|199558|12|1|Standard tombstone with grid pattern of 1/2-13 threaded|Y
01|199558|12|2|inserts and .501 ID hardened bushings. All Sides.|Y
01|199558|16|1|Standard Blank Plate Double Sided|Y
01|199558|17|1|Standard Blank Tombstone Trunnion Fixture.|Y
01|199558|18|1|Standard Blank Tombstone Trunnion Fixture.|Y
01|199564|3|1|NET Cost - No Discount Applies|Y
01|199564|4|1|NET Cost - No Discount Applies|Y
01|199564|5|1|NET Cost - No Discount Applies - MIN Markup|Y
01|199565|4|1|To be determined upon receipt of angle head|Y
01|199565|4|2|questionnaire.|Y
01|199566|3|1|NET Cost - No Discount Applies|N
01|199566|4|1|NET Cost - No Discount Applies|N
01|199566|5|1|NET Cost - No Discount Applies - MIN Markup|Y
01|199577|1|1|in stock in IL additional pieces have a 10-12 wk ETA|Y
01|199582|2|1|Hydraulic Pump is optional|Y
01|199582|2|2|in case utilizing Hydraulic directly from H. Boring M|Y
01|199582|2|3|the optional Hydraulic Pump may not be needed|Y
01|199583|2|1|Hydraulic Pump is optional|Y
01|199583|2|2|in case utilizing Hydraulic directly from H. Boring M|Y
01|199583|2|3|the optional Hydraulic Pump may not be needed|Y
01|199587|1|1|ATD19-M16 Mori Tap Collet .492 X .394 or 12.5 X 10.0|Y
01|199600|13|1|Replacement for Hydraulic Holders|Y
01|199600|21|1|Replacement for 1.0 Drill Extension|Y
01|199618|1|1|HSK100 interface with Grob G550T machine spindle|Y
01|199618|1|2|ER25 Output with Int/Ext Coolant 8000 RPM 1:1 Gear|Y
01|199618|1|3|Right Angle Head.|Y
01|199618|1|4|Pricing:|Y
01|199618|1|5|2 pcs. - $15200.00 each|Y
01|199618|1|6|3 pcs. - $13200.00 each|Y
01|199618|1|7|4 pcs. - $12150.00 each|Y
01|199628|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS.|Y
01|199628|3|2|LENGTH REQUIREMENTS FOR CABLE MANAGEMENT WILL BE|Y
01|199628|3|3|DIRECTED BY MIDACO CORPORATION|Y
01|199628|4|1|INSTALLATION INCLUDES WIRING FROM ELECTRICAL CABINET|Y
01|199628|4|2|TO BULKHEAD LOCATION; THEN EXTERNAL POWER AND|Y
01|199628|4|3|FEEDBACK CABLES WILL BE INSTALLED AT MIDACO'S CABLE|Y
01|199628|4|4|MANAGEMENT TRACK LOCATION. INSTALLATION ALSO INCLUDES|Y
01|199628|4|5|(2) BETA AMPLIFIER UNITS & TRAVEL + LABOR FOR LYNDEX|Y
01|199628|4|6|NIKKEN SERVICE TECHNICIAN.|Y
01|199632|7|1|100% DISCOUNT ASSUMINGF MATT MOWELL @ M83 WILL|Y
01|199632|7|2|PERFORM INSTALLATION & TRAINING|Y
01|199640|2|1|quoted as an in stock option|Y
01|199662|1|1|Please note: Our vendor will close the week of 08/04|Y
01|199662|1|2|thru 08/28 for summer break.|Y
01|199673|1|1|RGA#LVR-59660/|Y
01|199673|1|2|Repair of MZQT47-ER32Z-ICE s/n:20905006 12|Y
01|199673|1|3|(Mimatic#124873)|Y
01|199673|2|1|Bearings seals o-rings to be replaced.|Y
01|199673|4|1|RGA#LVR-59660/|Y
01|199673|4|2|Repair of MZQT47-ER32Z-ICE s/n:21900364 02|Y
01|199673|4|3|(Mimatic#124873)|Y
01|199673|5|1|Bearings seals o-rings to be replaced.|Y
01|199703|1|1|RGA#CUR-59664/|Y
01|199703|1|2|Repair of C40RAM-ER32-180-65TP s/n:64598 04|Y
01|199703|1|3|(Mimatic#178108)|Y
01|199703|2|1|Bearings seals and o-rings to be replaced.|Y
01|199708|1|1|This item is considered special once an order is|Y
01|199708|1|2|placed it cannot be cancelled or returned. Net price|Y
01|199708|1|3|has been quoted and no further discount should be taken|Y
01|199731|1|1|Howa part # ORC63x1200-M-L|Y
01|199731|1|2|Howa Rodless Cylinder - Item NET Weight: 20kg (44 LBS)|Y
01|199731|1|3|This item is considered special once ordered it cannot|Y
01|199731|1|4|be cancelled or returned.|Y
01|199736|1|1|Once we begin the modification process this holder|Y
01|199736|1|2|cannot be cancelled or returned.|Y
01|199757|1|1|BT30-SK13-60P BT30 Slim Chuck SK13 High Speed|Y
01|199757|1|2|30000rpm G2.5|Y
01|199757|15|1|BT40-SK13-60P|Y
01|199757|17|1|BT40-SK13-60P|Y
01|199757|17|2|BT40 Slim Chuck SK13 High Speed 30000rpm G2.5|Y
01|199774|1|1|Special demo table pricing. This unit was a showroom|Y
01|199774|1|2|consignment table. No chips were cut on this table.|Y
01|199774|3|1|CNC ENGINEERING INSTALLATION OF 5AX-350FA-M TABLE|Y
01|199774|4|1|RISER TO LIFT WORKHOLDING ABOVE TRUNNION SHOULDER|Y
01|199774|4|2|ON THE ROTARY TABLE. THIS WILL ALLOW ACCOMODATION OF|Y
01|199774|4|3|PARTS 20 AND LARGER.|Y
01|199782|4|1|Lyndex-Nikken to make block upon receipt of spindle|Y
01|199782|4|2|drawing specs.|Y
01|199782|4|3|*NET PRICE|Y
01|199801|1|1|This item is considered special once ordered cannot|Y
01|199801|1|2|be cancelled or returned.|Y
01|199850|1|1|1st Batch/949399 Paragon/Unverferth Mfg|Y
01|199851|5|1|Includes: Dual axis drive short bar fiber optic|Y
01|199851|5|2|cables communications cables bulkhead cables.|Y
01|199857|6|1|This size is special and not stocked in the US. Once|Y
01|199857|6|2|ordered cannot be cancelled or returned.|Y
01|199857|9|1|This size is special and not stocked in the US. Once|Y
01|199857|9|2|ordered cannot be cancelled or returned.|Y
01|199896|1|1|RGA#CUR-59664/|Y
01|199896|1|2|Repair of C40RAM-ER32-180-65TP s/n:64598 04|Y
01|199896|1|3|(Mimatic#178108)|Y
01|199896|2|1|Bearings seals and o-rings to be replaced.|Y
01|199903|1|1|These will be available in Japan the week of 7/17 it|Y
01|199903|1|2|takes 2-3 weeks to get them to the US.  If they are|Y
01|199903|1|3|are ordered know the ETA would be the week of 8/7|Y
01|199903|1|4|SPECIAL ORDER NON-CANCELABLE NON-RETURNABLE ARO|Y
01|199923|1|1|AC003007 RFID BIS-C-122-04/L installed and holder|Y
01|199923|1|2|re-balanced. Holder and packaging etched with AC003007|Y
01|199923|2|1|AC003009 RFID BIS-C-122-04/L installed and holder|Y
01|199923|2|2|re-balanced. Holder and packaging etched with AC003009|Y
01|199923|3|1|CAT40-SF0750-3.15CP-IDI|Y
01|199923|3|2|CAT40 Shrink Fit Holder 3/4 With Coolant ports.|Y
01|199923|3|3|AC003018 RFID BIS-C-122-04/L installed and holder|Y
01|199923|3|4|re-balanced. Holder and packaging etched with AC003018|Y
01|199923|4|1|AC003001 RFID BIS-C-122-04/L installed and holder|Y
01|199923|4|2|re-balanced. Holder and packaging etched with AC003001|Y
01|199932|1|1|This item is considered special once ordered cannot|Y
01|199932|1|2|be cancelled or returned.|Y
01|199936|1|1|Price reflects a purchase order of 1~4 Boring Units|Y
01|199936|2|1|Price reflects a purchase order of 5~10 Boring Units|Y
01|199936|3|1|Price reflects a purchase order of 11~14 Boring Units|Y
01|199941|1|1|COLLET SEAT PIN LOCATOR/3 pc set|Y
01|199941|1|2|Price is a one time courtesy|Y
01|199942|1|1|w/ PS-123E installed at factory|Y
01|199942|2|1|Installed on NC5-46-C25-90 at factory|Y
01|199951|2|1|Per Nikken Japan PS-17 must be installed in testbar|Y
01|199951|2|2|before relase of order to Yamazen.|Y
01|199969|11|1|Alt for listed AC1306EO|Y
01|199975|1|1|Replacement table with motor and 4' cable|Y
01|199994|1|1|Minimum order quantity 5-pcs.|Y
01|199999|1|1|Discount reflects a PO of 1~5 holders.|Y
01|199999|1|2|Discount for 6~10 is 30%.|Y
01|199999|2|1|Discount reflects a PO of 1~5 holders.|Y
01|199999|2|2|Discount for 6~10 is 30%.|Y
01|200014|1|1|RGA#TAR-59647|Y
01|200014|1|2|5AX-2MT-105-120  SN:8292F|Y
01|200015|1|1|This item is considered special once ordered cannot|Y
01|200015|1|2|be cancelled or returned.|Y
01|200015|12|1|This item is considered special once ordered cannot|Y
01|200015|12|2|be cancelled or returned.|Y
01|200015|13|1|** Closeout Promotion! All sales are FINAL!**|Y
01|200015|14|1|This item is considered special once ordered cannot|Y
01|200015|14|2|be cancelled or returned.|Y
01|200015|15|1|10 pcs late July; Balance Mid-November|Y
01|200015|17|1|This item is considered special once ordered cannot|Y
01|200015|17|2|be cancelled or returned.|Y
01|200015|29|1|This item is considered special once ordered cannot|Y
01|200015|29|2|be cancelled or returned.|Y
01|200015|30|1|This item is considered special once ordered cannot|Y
01|200015|30|2|be cancelled or returned.|Y
01|200049|1|1|Lyndex Part # BMT65-C4X-ICE  Mimatic Part # 197602|Y
01|200049|1|2|BMT65 Straight Live Tool C4 output -ICE|Y
01|200049|1|3|This item is considered special once ordered cannot|Y
01|200049|1|4|be cancelled or returned. Net price has been quoted no|Y
01|200049|1|5|futher discount should be taken.|Y
01|200073|1|1|**Note: Holders are close out stock and can not be|Y
01|200073|1|2|returned.|Y
01|200087|1|1|CNC321BFA-8PRJ|Y
01|200087|1|2|Ref S#15751 Special table for Aisin|Y
01|200087|1|3|Quoted as net pricing|Y
01|200087|1|4|Non cancellable Non returnable after receiving the PO|Y
01|200087|2|1|air shipment by option|Y
01|200087|3|1|Option Airshipment|Y
01|200100|2|1|*spanner style nut - wrench size 40-42mm|Y
01|200100|5|1|*spanner style nut - wrench size 50-55mm|Y
01|200111|1|1|Howa HH61C100|Y
01|200111|1|2|Rotary Hydraulic Cylinder|Y
01|200113|2|1|ITEM IS QUOTED AT A NET PRICE|Y
01|200117|2|1|Quoted at NET price and this item is non-returnable.|Y
01|200137|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|200138|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|200147|1|1|RGA#CUR-59684/|Y
01|200147|1|2|Repair of C50-MRAM s/n:19902593 02 (Mimatic#162732)|Y
01|200147|2|1|Bearings seals and o-rings to be replaced.|Y
01|200148|1|1|TAT-250 SN 3088|Y
01|200152|1|1|1st Batch 4/5:DWG Saved in Teams File.|Y
01|200164|1|1|1st Batch (2)935208  12/12 approved|Y
01|200164|2|1|Req.INS/Install E20-NUT|Y
01|200164|3|1|1st Batch 10/26/22 approved|Y
01|200164|4|1|Req.INS/Install E25-NUT|Y
01|200164|5|1|Req.INS/T/P Inspection Required|Y
01|200164|6|1|Req.INS/T/P Inspection Required|Y
01|200164|7|1|Req.INS/T/P Inspection Requiredfor stock|Y
01|200164|8|1|1st Batch/ T/P Inspection Required|Y
01|200164|9|1|Req.INS/T/P Inspection Required|Y
01|200164|10|1|Req INS IT0747 replacement/951924 - HSK63A-0500-4.00|Y
01|200167|2|1|CAT40 Bar Blanks; 4 Dia 8 length made to AT2 Stds.|Y
01|200167|2|2|MOQ = 10pcs|Y
01|200167|2|3|This are complete specials once ordered cannot be|Y
01|200167|2|4|cancelled or returned.|Y
01|200167|2|5|ETA 24 Working weeks after signed aproval drawing|Y
01|200177|1|1|C4001-22-80CP|Y
01|200177|1|2|CAT40 Shell Mill Holder 22mm IdChipHole CoolantPorts|Y
01|200177|1|3|Spec:  Special Gage Length 80mm|Y
01|200177|1|4|Special Order. Net Price Each.|Y
01|200188|1|1|CNC200 SN: 8658|Y
01|200188|1|2|CUSTOMER REQUESTED DIAGNOSIS OF WIRING AND TABLE|Y
01|200188|1|3|BACKLASH OK -> ADJUSTED FROM .030MM TO .012MM OF|Y
01|200188|1|4|MECHANICAL BACKLASH CHANGE OIL|Y
01|200188|1|5|ELECTRONICS CHECK OK QUOTING NEW HARNESS BELOW|Y
01|200188|3|1|REPLACEMENT WIRE HARNESS CABLE FROM MOTOR COVER|Y
01|200188|3|2|TO INDIVIDUAL SENSOR|Y
01|200190|1|1|Package Part# CAT40/BT40-START-2-200-Package|Y
01|200190|1|2|this package includes 10 free holders of same taper|Y
01|200209|2|1|Makino Knob @ $9.00 net ea.|Y
01|200209|2|2|Above price is for knob when matching toolholder is|Y
01|200209|2|3|placed at time of order|Y
01|200228|1|1|Bal of 1 pc ETA Pending|Y
01|200229|4|1|Magnescale RU77 Scale  installed|Y
01|200233|1|1|Mori T32332 Live Tool|Y
01|200233|1|2|MSL12-CT40|Y
01|200233|2|1|Mori T32247 Live Tool|Y
01|200233|2|2|MSL12-ER50|Y
01|200238|1|1|Mimatic Part # 186327 / Ref Drawing 00047749|Y
01|200238|2|1|Mimatic Part # 186327 / Ref Drawing 00047749|Y
01|200243|1|1|*Special - cannot be returned or cancelled|Y
01|200245|1|1|Nikken Part # 26-RAC53-70K-C|Y
01|200264|1|1|RGA#CUR-59740/|Y
01|200264|1|2|Repair of C40RA-0025M s/n:18902340 16 (Mimatic#175241)|Y
01|200264|2|1|Bearings seals and o-rings to be replaced.|Y
01|200268|1|1|RGA#LVR-59730/|Y
01|200268|1|2|Repair of MNZ20-SK16X-ICE-12K s/n:19903864 15|Y
01|200268|1|3|(Mimatic#193568)|Y
01|200268|2|1|Bearings seals and o-rings to be replaced.|Y
01|200275|6|1|wrench for BT30-ER16-70|Y
01|200280|2|1|Includes: 16C collet closer adapter plate air tube.|Y
01|200306|1|1|LEA20S-1/4|Y
01|200306|1|2|Lathe Reducing Sleeve/Bushing Brother 20-1/4 Coolant|Y
01|200306|1|3|Slotted|Y
01|200306|2|1|LEA20S-1/2|Y
01|200306|2|2|Lathe Reducing Sleeve/Bushing Brother 20-1/2 Coolant|Y
01|200306|2|3|Slotted|Y
01|200306|3|1|LEA20S-3/8|Y
01|200306|3|2|Lathe Reducing Sleeve/Bushing Brother 20-3/8 Coolant|Y
01|200306|3|3|Slotted|Y
01|200371|2|1|This is considered special once ordered cannot be|Y
01|200371|2|2|cancelled or returned.|Y
01|200373|2|1|This knob is not coolant thru.|Y
01|200379|1|1|BRS-3.0|Y
01|200391|2|1|SPECIAL 1 TIME PRICE|Y
01|200397|1|1|Please Note: Once a purchase order has been received|Y
01|200397|1|2|it cannot be cancelled or returned.|Y
01|200397|2|1|Please Note: Net price includes installation of chip|Y
01|200397|2|2|hole and RFID chip to be supplied by customer and|Y
01|200397|2|3|tap holder re-balanced. Tubes to be installed on|Y
01|200397|2|4|holders.|Y
01|200408|3|1|Installation includes: Bulkhead cables external cables|Y
01|200408|3|2|parameter changes service time and travel.|Y
01|200420|1|1|HSK100 interface with Grob G550T machine spindle|Y
01|200420|1|2|ER25 Output with Int/Ext Coolant 8000 RPM 1:1 Gear|Y
01|200420|1|3|Right Angle Head.|Y
01|200420|1|4|Pricing:|Y
01|200420|1|5|2 pcs. - $15200.00 each|Y
01|200420|1|6|3 pcs. - $13200.00 each|Y
01|200420|1|7|4 pcs. - $12150.00 each|Y
01|200426|1|1|P/N: BT40-TB40-300|Y
01|200426|1|2|Installed with Pull Stud P/N: XXXX at factory|Y
01|200426|1|3|MFG 45 days ** If pull stud is in stock|Y
01|200426|2|1|P/N: PS-881|Y
01|200426|2|2|Pull Stud for above|Y
01|200426|2|3|Machine: Makino A40 Pull Studs type NMTZ5001-PSB-25|Y
01|200426|3|1|P/N: BT30-TB40-300|Y
01|200426|3|2|Installed with Pull Stud P/N: XXXX at factory|Y
01|200426|3|3|MFG 45 days ** If pull stud is in stock|Y
01|200426|4|1|P/N: PS-876|Y
01|200426|4|2|Pull Studs for above|Y
01|200426|4|3|Machine: Mazak UN600-30H Pull Studs type NSTZ5001|Y
01|200426|4|4|S/PSB-30P-F7|Y
01|200452|1|1|RGA#LVR-59779/|Y
01|200452|1|2|Repair of MNL12-ER32Z-MS s/n:A1694 (Alps#T32216)|Y
01|200452|2|1|Bearings o-rings collet nuts and gears to be replaced|Y
01|200465|1|1|HSK63T-SLT10-80 Round Tool Holder 10mm X 80mm Gauge|Y
01|200465|2|1|HSK63T-SLT12-85  Round Tool Holder 12mm X 85 Gauge|Y
01|200468|1|1|HSK100A stub arbor with 1-1/4(31.75mm)pilot|Y
01|200468|1|2|to accept 4 diameter grind wheel & spacers for 2thick|Y
01|200478|1|1|MSL12-ID12Z-L / T00173|Y
01|200478|1|2|Mori Static ID1.1/4 Z-Axis 90Deg<Axial> MainSub Long|Y
01|200478|1|3|External Coolant|Y
01|200480|1|1|RGA#TAR-59743|Y
01|200480|1|2|5AX-200 SN:1558|Y
01|200482|1|1|This is for the M6 & 1/4.|Y
01|200482|2|1|This is for 5/16 & M8|Y
01|200482|3|1|This is for M10|Y
01|200482|4|1|This is for #10|Y
01|200487|2|1|Part # TBD>> Shaft CAT40Mimatic adaption of the|Y
01|200487|2|2|torque armApplication and machine-specific adapted|Y
01|200487|2|3|to the CNC machining centreA=65mm / Lyndex standard|Y
01|200487|2|4|taper pin.Tooling interface PG 16mmExternal cooling|Y
01|200487|2|5|reversal of rotation(Drive direction unequal output|Y
01|200487|2|6|direction)L=202.5mmgear ratio: 1:1.55max. torque:|Y
01|200487|2|7|5Nmmax. ingoing revolution: nl(max)= 5140rpm|Y
01|200487|2|8|max. outgoing revolution: n2(max)= 8000rpm Similar to|Y
01|200487|2|9|Mimatic drawing 00057097 Weight 6.5kg.|Y
01|200487|2|10|Pricing based upon a purchase of 6 angle heads.|Y
01|200487|6|1|Part # TBD>>Shaft modula drive unit CAT40: 162813|Y
01|200487|6|2|Mimatic adaption of the torque armApplication- and|Y
01|200487|6|3|machine-specific adapted to the CNC machining centre|Y
01|200487|6|4|tooling interface PG 16mmExternal cooling reversal|Y
01|200487|6|5|of rotation(Drive direction unequal output direction)|Y
01|200487|6|6|L=202.5mmgear ratio: 1:1.55max. torque: M(max)=5 Nm|Y
01|200487|6|7|max. ingoing revolution: nl(max)= 5140rpmmax. outgoing|Y
01|200487|6|8|revolution: n2(max)= 8000rpmsimilar to mimatic|Y
01|200487|6|9|drawing #00062063weight around. 65 kg|Y
01|200487|6|10|Pricing based upon a purchase of 6 angle heads.|Y
01|200487|11|1|Mimatic #203017: PolyMILL Type P1613 012.7mm z3|Y
01|200487|11|2|Tinamatic A3.5 2xR0.15 reverse raw.|Y
01|200487|11|3|** Cutting 0=012.7mm number of teeth/flutes z=3|Y
01|200487|11|4|** Cutting width A3.5mm w/ corner radius 2xR0.15|Y
01|200487|11|5|** Insert reverse raw for face milling|Y
01|200487|11|6|** Carbide grade FKN (micro grain) Tinamatic coating|Y
01|200487|11|7|Minimum order 10 inserts|Y
01|200487|12|1|Mimatic #203017|Y
01|200487|13|1|Mimatic #203017|Y
01|200487|14|1|Mimatic #203017|Y
01|200489|1|1|4PRJ for CNC180LFA|Y
01|200489|2|1|TCD-37313|Y
01|200489|2|2|4PRJ for TAT-170|Y
01|200491|1|1|HP-150 Height Presetter 150mm Dial Graduation .01mm|Y
01|200498|1|1|1st Batch/Includes:Stopblock Case and Wrenches|Y
01|200505|1|1|H63F-SF0750-6.00CP HSK63F Shrink Fit Holder 3/4 with|Y
01|200505|1|2|coolant ports. No drive pins required.|Y
01|200529|1|1|GE Lynn Part Number 390A1700|Y
01|200529|1|2|Packaging to be etched with part number 390A1700|Y
01|200553|1|1|HSK63A-HC32-125|Y
01|200555|1|1|RGA#LVR-59726/|Y
01|200555|1|2|Repair of BMT65-ER32Z s/n:77417 05 (Mimatic#192964)|Y
01|200555|2|1|Bearings seals and o-rings to be replaced.|Y
01|200555|4|1|RGA#LVR-59726/|Y
01|200555|4|2|Repair of BMT65-ER32X s/n:77121 14 (Mimatic#186489)|Y
01|200555|5|1|Bearings seals and o-rings to be replaced.|Y
01|200565|1|1|Knobs are $6.00net ea for each matching holder ordered|Y
01|200594|1|1|Quoted with Makino Pins|Y
01|200594|2|1|Quoted with Makino Pins and pricing reflects a purchase|Y
01|200594|2|2|order of 10+ holders.|Y
01|200598|1|1|CNC260 x5 inspection service|Y
01|200613|1|1|***NON-CANCELLABLE; NON-RETURNABLE ONCE PO PLACED|Y
01|200613|1|2|UNLESS THERE IS A MANUFACTURING DEFECT***|Y
01|200626|3|1|Includes: Bulkhead cables external cabels parameter|Y
01|200626|3|2|changes service time and travel.|Y
01|200626|7|1|Includes: Drive unit short bar fiber optic cable|Y
01|200626|7|2|communications cable bulkhead cables external cables|Y
01|200626|7|3|parameter changes service time and travel.|Y
01|200631|1|1|RGA#TAR-59766|Y
01|200631|1|2|TAT-170N SN:42587B|Y
01|200638|1|1|INCLUDES:|Y
01|200638|1|2|-(2) 6 PORT (1000 PSI MAX) BUILT IN ROTARY UNIONS|Y
01|200638|1|3|-(2) ADAPTER PLATES FOR 4 PNEUMATIC VISES|Y
01|200638|1|4|-(1) INSTALLATION OF ROTARY TABLE INCLUDING: TRAVEL|Y
01|200638|1|5|LABOR WIRING POWER/FEEDBACK CABLES AIR CONNECTION|Y
01|200638|1|6|SETTING CORRECT PARAMETERS & TESTING FOR PROPER|Y
01|200638|1|7|FUNCTIONALITY BEFORE LEAVING KENNAMETAL FACILITY.|Y
01|200638|1|8|-(1) INCLUDES FREIGHT COST OF SHIPPING ROTARY TABLE|Y
01|200638|1|9|FROM OUR FACILITY IN IL TO KENNAMETAL IN TN.|Y
01|200641|1|1|RGA#LVR-59783|Y
01|200641|1|2|Repair of MNL12-SK20X-ICE-10K s/n: 18900510 16|Y
01|200641|1|3|(Mimatic#184649)|Y
01|200641|2|1|Bearings seals o-rings & threadring to be replaced.|Y
01|200641|4|1|RGA#LVR-59783/|Y
01|200641|4|2|Repair of MNL12-SK20X-ICE-10K s/n:18900510 18|Y
01|200641|4|3|(Mimatic#184649)|Y
01|200641|5|1|Bearings seals and o-rings to be replaced.|Y
01|200654|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|200654|2|2|INCLUDED AT NO COST TO TRIDENT OR NORTHROP GRUMMAN|Y
01|200658|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|200658|2|2|INCLUDED AT NO COST TO TRIDENT OR NORTHROP GRUMMAN|Y
01|200661|1|1|RGA#TAR-59777|Y
01|200661|1|2|CNCZ202  SN:24047TC|Y
01|200668|2|1|Installation kit: Drive unit short bar fiber optic|Y
01|200668|2|2|cable communications cable bulkhead cable external|Y
01|200668|2|3|cables.|Y
01|200671|1|1|BT50-2TG6S-150|Y
01|200671|2|1|BT0-2TG8S-150|Y
01|200671|3|1|BT50-2TG10S-150|Y
01|200671|4|1|BT50-2TG12S-150|Y
01|200671|5|1|BT50-2TG16S-150|Y
01|200678|1|1|Special one time pricing|Y
01|200681|1|1|***NON-CANCELLABLE; NON-RETURNABLE ONCE PO PLACED|Y
01|200681|1|2|UNLESS THERE IS A MANUFACTURING DEFECT***|Y
01|200687|1|1|P/N: BT40-TB40-300|Y
01|200687|1|2|BT40 Taper Test Bar 300mm g.l.|Y
01|200687|2|1|P/N: PS-881|Y
01|200687|2|2|Pull stud for above|Y
01|200687|2|3|Machine: Makino A40 Pull Studs type NMTZ5001-PSB-25|Y
01|200687|3|1|P/N: BT30-TB40-300|Y
01|200687|3|2|BT30 Taper Test Bar 300mm g.l.|Y
01|200687|4|1|P/N: PS-876|Y
01|200687|4|2|Pull Stud for above Machine: Mazak UN600-30H|Y
01|200687|4|3|Pull Studs type NSTZ5001 S/PSB-30P-F7|Y
01|200708|3|1|RISER TO MATCH CENTER HEIGHT OF TAT-170 TO CNC260P|Y
01|200708|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ORDERED|Y
01|200708|4|2|TO LENGTH FOR HYUNDAI WIA 960 VMC|Y
01|200708|5|1|INCLUDES FULL TABLE INTALLATION FOR HYUNDAI WIA 960B|Y
01|200708|5|2|ALSO INCLUDES AMP/WIRING/PARAMETER INSTALLATION|Y
01|200708|5|3|FOR HYUNDAI WIA KF5600. KF5600 WILL NOT HAVE A|Y
01|200708|5|4|ROTARY TABLE INSTALLED THIS IS JUST TO HAVE THE|Y
01|200708|5|5|MACHINE PREPPED TO ACCEPT A ROTARY TABLE.|Y
01|200708|8|1|ADAPTER PLATE FOR TAT-170 TO TRUNNION|Y
01|200714|7|1|2 in stock in IL at this price.  If no stock at time of|Y
01|200714|7|2|order NET Price will be different|Y
01|200745|1|1|RGA#TAR-59725|Y
01|200745|1|2|CNC200ZA SN:4136|Y
01|200759|1|1|RGA#CUR-59770/|Y
01|200759|1|2|Repair of C8RAM-ER40-225-110TPOVT s/n:21905840 02|Y
01|200759|1|3|(Mimatic#199040)|Y
01|200759|2|1|Bearings seals and o-rings to be replaced|Y
01|200771|1|1|RGA#TAR-59737|Y
01|200771|1|2|5AX-201MA SN:5376|Y
01|200780|1|1|RGA#TOR-59755/|Y
01|200780|1|2|Option#1: Repair of BT40-C7/8-75 (Tool#1)|Y
01|200780|5|1|RGA#TOR-59755/|Y
01|200780|5|2|Option#1: Repair of BT40-C7/8-75 (Tool#2)|Y
01|200780|9|1|RGA#TOR-59755/|Y
01|200780|9|2|Option#1: Repair of BT40-C7/8-75 (Tool#3)|Y
01|200780|13|1|RGA#TOR-59755/|Y
01|200780|13|2|Option#1: Repair of BT40-C7/8-75 (Tool#4)|Y
01|200780|15|1|RGA#TOR-59755|Y
01|200780|15|2|Option#1: Repair of BT40-C7/8-75 (Tool#2)|Y
01|200785|1|1|1 piece STOCK in Jpn ETA 1-2 weeks ARO|Y
01|200785|1|2|1 piece 4 weeks MFG plus 1-2 weeks ARO|Y
01|200787|1|1|M10HZ-100V(M3) ISO Spec|Y
01|200787|1|2|Nikken ZMAC-V (ISO) Boring Head Unit|Y
01|200790|1|1|Mimatic# VDI40-BLANK-83-120|Y
01|200790|1|2|VDI40 BLANK ROUND 83mm diameter x 120mm long|Y
01|200790|1|3|Special - cannot be cancelled or returned|Y
01|200798|1|1|**Modified- cannot be cancelled or returned|Y
01|200809|1|1|Cables are included|Y
01|200809|2|1|Cables are included|Y
01|200831|1|1|Pending|N
01|200831|2|1|Quoted at Net Price/ Refer to Tim Reeves /Lyndex-Nikken|Y
01|200831|2|2|engineer's e-mail.|Y
01|200848|2|1|*NET price|Y
01|200848|2|2|*Modification at LN|Y
01|200864|2|1|eta week of 10/2|Y
01|200866|1|1|s/n:9799002 Loaner for purchase|Y
01|200866|4|1|s/n:97046 Loaner for purchase|Y
01|200879|1|1|TAR-59743 5AX-2002 SN: 1608|Y
01|200879|36|1|Repaces CRBH13025AUUE03|Y
01|200882|1|1|1st Batch/(1)949186 5/18:DWG Saved in Teams File.|Y
01|200889|4|1|**Only for 100TG collet chucks|Y
01|200889|5|1|for SK20 & C3/4 holders|Y
01|200889|6|1|for NBT30-SK16C-60 holder|Y
01|200889|30|1|*Disc wrench for CKFN20(3/4)-1/2|Y
01|200889|62|1|disc wrench for CKFN20(3/4)-3/8|Y
01|200889|68|1|part of handle set for NB3007-0025-2.00G|Y
01|200889|69|1|part of handle set for NB3007-0025-2.00G|Y
01|200893|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|200896|1|1|Pending|N
01|200928|1|1|HSK160B-SM1250-6.00|Y
01|200929|1|1|Lyndex Part # OKE4-ER32X-OFF-303.5|Y
01|200929|1|2|OKUMA Live ER32 X-Axis STRT U-Shape ;|Y
01|200929|1|3|L=50mm; L1= 303.5mm; 1:1 GEAR ; MAX 6000 RPM; 50Nm;|Y
01|200929|1|4|Reference Similar DRWG# 00049339|Y
01|200929|1|5|2 pc price - $20414.88 net each.|Y
01|200929|1|6|3 pc price - $17421.40 net each.|Y
01|200940|1|1|CABLE SET FOR CNC321TFA ON KITAMURA HX500I|Y
01|200940|1|2|INTERFACE CABLE - 25FT CABINET SIDE COMPLETE|Y
01|200940|1|3|SINGLE 28-11S CONNECTOR LOOSE WITH LOOSE WIRES|Y
01|200940|1|4|TO SOLDER COMPLETE|Y
01|200943|4|1|MNZ20-ER20X-MD-EC|Y
01|200985|1|1|CHA-3.0 CHA Collet 3.0mm for IC300 NS Angle Head|Y
01|200994|1|1|CAT50-MMC4-105U-AA|Y
01|200994|1|2|CAT50 Mini Chuck 4mm Bevel Gear Type 20Krpm G2.5|Y
01|200999|1|1|C8 TAPER ATTACHMENT|Y
01|200999|2|1|ER25 LONG ANGLE HEAD ATTACHMENT|Y
01|200999|3|1|110MM PITCH POSITIONING PIN ATTACHMENT|Y
01|200999|4|1|100MM EXTENSION FOR ANGLE HEAD ATTACHMENT|Y
01|200999|5|1|ER25 1/2 COLLET|Y
01|200999|6|1|CUSTOM POSITIONING BLOCK FOR MAZAK i630V MACHINE|Y
01|201007|1|1|TOR-59723/|Y
01|201007|1|2|Repair of PF-2|Y
01|201007|2|1|Calibration service included|Y
01|201013|1|1|1st Batch/1p for 950203(Gosiger)|Y
01|201027|1|1|This is a discontinued item we have 11pcs left in|Y
01|201027|1|2|inventory once they are gone there is no replacement|Y
01|201027|1|3|Non-cancelable Non-returnable after receipt of PO|Y
01|201035|1|1|C8-EM1000-6.00 Polygon C8 End Mill Holder 1|Y
01|201035|1|2|Please Note: Minimum order 2-pcs.|Y
01|201035|2|1|C8-EM0750-6.00 Polygon C8 End Mill Holder 3/4|Y
01|201035|2|2|Minimum order 10-pcs.|Y
01|201035|3|1|C8-EM0500-6.00 Polygon C8 End Mill Holder 1/2|Y
01|201035|3|2|Please Note: Minimum order 2-pcs.|Y
01|201035|4|1|C8-EM0500-4.00 Polygon C8 End Mill Holder 1/2|Y
01|201035|5|1|C8-EM0375-6.00 Polygon C8 End Mill Holder 3/8|Y
01|201035|5|2|Minimum order 5-pcs.|Y
01|201035|6|1|C8-EM0250-6.00 Polygon C8 End Mill Holder 1/4|Y
01|201035|6|2|Minimum order 3-pcs.|Y
01|201035|7|1|C8-ER20-4.00 Polygon C8 ER20 Collet Chuck High Torque|Y
01|201035|7|2|Bearing Nut >> Minimum Order 2-pcs.|Y
01|201035|8|1|C8-ER20-6.00 Polygon C8 ER20 Collet Chuck High Torque|Y
01|201035|8|2|Bearing Nut >> Minimum Order 10-pcs|Y
01|201035|9|1|C8-ER20-8.00 Polygon C8 ER20 Collet Chuck High Torque|Y
01|201035|9|2|Bearing Nut >> Minimum Order 10-pcs.|Y
01|201035|10|1|C8-ER32-4.00 Polygon C8 ER32 Collet Chuck High Torque|Y
01|201035|10|2|Bearing Nut >> Minimum Order 2-pcs|Y
01|201035|13|1|C8-SF0750-6.00CP Polygon C8 Shrink Fit Holder 3/4|Y
01|201035|13|2|Coolant Ports >> minimum order 2-pcs.|Y
01|201035|16|1|C8-SF0500-6.00CP Polygon C8 Shrink Fit Holder 1/2|Y
01|201035|16|2|Coolant Ports >. Minimum Order 3-pcs|Y
01|201035|19|1|C8-SF0375-6.00CP Polygon C8 Shrink Fit Holder 3/8|Y
01|201035|19|2|Coolant Ports >> Minimum Order 2-pcs|Y
01|201035|22|1|C8-SF0250-6.00CP Polygon C8 Shrink Fit Holder 1/4|Y
01|201035|22|2|Coolant Ports >> Minimum Order 2-pcs.|Y
01|201049|1|1|M7HZ-70CH(M3)|Y
01|201049|1|2|Nikken ZMAC-V-I Boring Unit/cartridge (ISO spec)|Y
01|201049|2|1|M625 Head Clamp Bolt for above|Y
01|201049|3|1|M10HZ-100CH(M3)|Y
01|201049|3|2|Nikken ZMAC-V-I Boring Unit/cartridge (ISO spec)|Y
01|201049|4|1|M835 Head Clamp Bolt for above|Y
01|201057|3|1|match E346V+|Y
01|201057|6|1|our sales team will help setup provide training|Y
01|201059|3|1|match E346V+|Y
01|201059|6|1|our sales team will help setup provide training|Y
01|201073|1|1|INCLUDES:|Y
01|201073|1|2|-(2) 6 PORT (1000 PSI MAX) BUILT IN ROTARY UNIONS|Y
01|201075|1|1|IT50-C25-105|Y
01|201075|1|2|if no stock at time of order leadtime is 3 months aro|Y
01|201075|2|1|IT50-C25-135|Y
01|201075|2|2|lead time may change if order is delayed|Y
01|201085|1|1|Does not come in 4.12 GL with the high torque bearing|Y
01|201085|1|2|nut remaining pieces ETA is Week of 8/21/23|Y
01|201085|2|1|Longer alternative all in stock|Y
01|201085|3|1|Shorter alternative all in stock|Y
01|201085|9|1|replaces C4017-0020-4.00|Y
01|201085|13|1|replaces C4017-0025-4.00|Y
01|201085|16|1|does not come in 4.00GL this is shorter alternative|Y
01|201085|17|1|longer alternative|Y
01|201100|2|1|Replaces TQW-150|Y
01|201100|3|1|Replaces TQW-SK06(18)|Y
01|201100|5|1|Replaces TQW-ER16/SK13(32)|Y
01|201100|6|1|Replaces TQW-SK16(43)-M|Y
01|201100|7|1|Replaces TQW-ER32/SK20/TG75(50)|Y
01|201109|1|1|Discontinued cannot be returned.|Y
01|201123|4|1|Installation Cost includes junction box/cables/|Y
01|201123|4|2|centerdivider/Labor/Travel Fee and etcs...|Y
01|201127|2|1|Only one of these left discontinued. Can't be returned|Y
01|201136|2|1|PLEASE PULL FROM USED WAREHOUSE|Y
01|201136|3|1|PLEASE PULL FROM USED WAREHOUSE|Y
01|201136|4|1|PLEASE PULL FROM USED WAREHOUSE|Y
01|201140|1|1|Currently have 5pcs readily available|Y
01|201140|2|1|Currently have 18pcs readily available|Y
01|201140|3|1|Currently have 5pcs readily available|Y
01|201140|4|1|Currently have 23pcs readily available|Y
01|201140|5|1|Spindle Wrench for Live Tool|Y
01|201140|6|1|Collet Nut Spanner Wrench for Live Tool|Y
01|201147|1|1|INSPECTION FEE FOR TAR-59297|Y
01|201147|1|2|CNCZ180LSA-BR2 SN: 25321T/28104T|Y
01|201147|1|3|CUSTOMER DECLINED QUOTED REPAIRS|Y
01|201148|1|1|BOAT#07192301-B: No INS Req'd.|N
01|201148|2|1|BOAT#07192301-B: No INS Req'd.|N
01|201148|3|1|BOAT#07192301-B: No INS Req'd.|N
01|201148|4|1|BOAT#07192301-B: No INS Req'd.|N
01|201148|5|1|BOAT#07192301-B: No INS Req'd.|N
01|201148|6|1|BOAT#07192301-B: No INS Req'd.|N
01|201148|7|1|BOAT#07192301-B: No INS Req'd.|N
01|201148|8|1|BOAT#07192301-B: No INS Req'd.|N
01|201160|1|1|CNC1600 ROTARY TABLE WITH FANUC MOTOR INSTALLED|Y
01|201160|2|1|HYDRAULIC UNIT FOR POWERING CNC1600 BRAKE AND|Y
01|201160|2|2|HYDRAULIC TAILSTOCK.|Y
01|201160|3|1|EXTENDED LENGTH EXTERNAL POWER/FEEDBACK CABLES FOR|Y
01|201160|3|2|4TH AXIS.|Y
01|201160|4|1|63 4-JAW SELF CENTERING CHUCK WITH ADATPER PLATE|Y
01|201160|4|2|TO FIT ONTO CNC1600 ROTARY TABLE|Y
01|201160|5|1|SPECIAL HYDRAULIC HEAVY DUTY TAILSTOCK|Y
01|201194|2|1|Special installation pricing for Hurco kit to be|Y
01|201194|2|2|provided by Machinery Source|Y
01|201194|2|3|Machinery Source to provide technical and service|Y
01|201194|2|4|support for the installation.|Y
01|201199|1|1|This item is discontinued once ordered it cannot be|Y
01|201199|1|2|returned.|Y
01|201201|2|1|Etch Pratt & Whitney part# and re-box|Y
01|201201|2|2|TAM211014|Y
01|201203|3|1|** Closeout Promotion! All sales are FINAL!**|Y
01|201210|1|1|90DEG AGH;shank HSKI00A complete w/Torque-Arm & locking|Y
01|201210|1|2|mechanism & 3 pin support machine specific adjusted(w/o|Y
01|201210|1|3|machine specific stopblock)A=118mm adjusted w/o collet|Y
01|201210|1|4|system ER25(05 - 160mm)according DIN6499 w/Oil-mist-|Y
01|201210|1|5|lubrication internal coolant supply through spindle|Y
01|201210|1|6|center & external over coolant pipehead NOT 360deg|Y
01|201210|1|7|adjustable!output direction is reversal to input! L1=|Y
01|201210|1|8|260 mm gear ratio: i(n1/n2)=1:1 max.torque M(max)=30Nm|Y
01|201210|1|9|max.revolution nl(max)-8.000r.p.m. n2(max)=8.000 r.p.m.|Y
01|201210|1|10|weight approx 30kg  MIM#Po10140066/SIMILAR DRW#00040520|Y
01|201210|3|1|90DEG AGH;shank HSKI00A complete w/Torque-Arm & locking|Y
01|201210|3|2|mechanism & 3 pin support machine specific adjusted(w/o|Y
01|201210|3|3|machine specific stopblock)A=118mm adjusted w/o collet|Y
01|201210|3|4|system ER25(05 - 160mm)according DIN6499 w/Oil-mist-|Y
01|201210|3|5|lubrication internal coolant supply through spindle|Y
01|201210|3|6|center & external over coolant pipehead NOT 360deg|Y
01|201210|3|7|adjustable!output direction is reversal to input! L1=|Y
01|201210|3|8|260 mm gear ratio: i(n1/n2)=1:1 max.torque M(max)=30Nm|Y
01|201210|3|9|max.revolution nl(max)-8.000r.p.m. n2(max)=8.000 r.p.m.|Y
01|201210|3|10|weight approx 30kg  MIM#Po10140066/SIMILAR DRW#00040520|Y
01|201210|5|1|Oil mist lubrication unit PRELUB GP2 2 connections|Y
01|201210|5|2|Power: 230 Volt Lubricator 30 mm3|Y
01|201210|5|3|Mimatic#181456|Y
01|201212|1|1|P/N: TBD|Y
01|201212|1|2|Okuma Live ER25 Adjustable Angular version +/-107DEG|Y
01|201212|1|3|1:1 GEAR MAX 10000 RPM; MAX 24Nm; Internal External|Y
01|201212|1|4|Coolant 1015 PSI|Y
01|201228|6|1|Balance of 3 pcs ETA 2-3 Weeks|Y
01|201230|1|1|P/N ZKG12-2S|Y
01|201230|1|2|ISO Metric Tap|Y
01|201230|9|1|P/N:ZKG12-1/8S(No.5S)|Y
01|201230|9|2|IMPERIAL BWS/BSF Tap Collet|Y
01|201230|10|1|P/N: ZKG12-No.6S|Y
01|201230|11|1|P/N: ZKG12-No.8S|Y
01|201230|13|1|P/N: ZKG12-3/16S(No.10S)|Y
01|201230|14|1|P/N: ZKG12-No.12S|Y
01|201230|15|1|P/N: ZKG12-1/4S|Y
01|201230|16|1|P/N: ZKG12-5/16S|Y
01|201230|17|1|P/N: ZKG12-3/8S|Y
01|201237|1|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|201237|2|1|Req.INS/Install SKN-10K|Y
01|201237|3|1|Req.INS/Install SKN-10K|Y
01|201237|4|1|Req.INS/Install SKN-16B|Y
01|201249|1|1|Qty 100-499|Y
01|201249|2|1|Qty 500+|Y
01|201249|3|1|Qty 100-499|Y
01|201249|4|1|Qty 500+|Y
01|201282|1|1|SN:6239 RGA#TAB-59821|Y
01|201282|1|2|CNC170|Y
01|201282|1|3|SN:8240 RGA#TAB-59821|Y
01|201282|1|4|CNC170|Y
01|201307|1|1|NIKKEN EZ CONTROL|Y
01|201307|1|2|COMPLETE WITH CONTROL BOX/SANYO MOTOR (SABR2)|Y
01|201307|1|3|CABLE AND PENDANT|Y
01|201307|1|4|CAN BE INSTALLED ON CNC180/CNC202/NCT200/CNC260|Y
01|201307|1|5|IN SA-BR2/SA-BR3|Y
01|201313|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|201319|24|1|Plug DIN|Y
01|201319|26|1|plug din|Y
01|201333|1|1|**Modified by LYN - Coolant Through the Flange|Y
01|201333|1|2|Net price|Y
01|201341|5|1|Can be used for TG75 nuts|Y
01|201346|3|1|Discontinued|Y
01|201346|4|1|Discontinued|Y
01|201346|5|1|Discontinued|Y
01|201346|6|1|Discontinued|Y
01|201346|7|1|Discontinued|Y
01|201346|8|1|Discontinued|Y
01|201356|2|1|SKJ25-5C >> SK20/SK25 Coolant Cap 5.0mm|Y
01|201356|2|2|Delivery: 2 stock at Nikken Japan/Bal 10 Weeks ARO|Y
01|201362|1|1|HSK80A Grinding Wheel Arbor per Pratt & Whitney|Y
01|201362|1|2|Dwg#PT979371|Y
01|201379|2|1|This item is considered special. One the modification|Y
01|201379|2|2|process has begun an order cannot be cancelled or|Y
01|201379|2|3|returned. Net price has been quoted no further|Y
01|201379|2|4|discount should be taken.|Y
01|201381|2|1|Core buy back promotion|Y
01|201386|4|1|Pricing is for individual installations this can be|Y
01|201386|4|2|adjusted if multiple installations can be scheduled|Y
01|201386|4|3|together.|Y
01|201394|1|1|HSK32E 4mm shrink 3.90 GL|Y
01|201394|1|2|Part# H32E-SF4-3.90|Y
01|201394|1|3|4 pc price = $328.00 net each|Y
01|201440|1|1|(T01)          OD Turning - Roughing|Y
01|201440|2|1|(T02)          OD Turning - Finish|Y
01|201440|3|1|(T03 Opt. B)   Milling Spline with R171.4 Cutter|Y
01|201440|4|1|(T05)          Drill 22mm|Y
01|201440|4|2|(T07)          Rough  OD Profile|Y
01|201440|4|3|(T08)          Finish OD Profile|Y
01|201440|5|1|(T09 Opt. A)   Finish Slot Groove Cam|Y
01|201440|5|2|(T11)          Chamfering 1 x Dia 1 and Profile|Y
01|201440|5|3|(T12)          Center Drill|Y
01|201440|10|1|(T20)          Semi-Finish 1 x Dia 1.000|Y
01|201440|10|2|(T21)          Chamfer 3 Sides of 2 x Dia 1.000|Y
01|201440|13|1|(T22)          Reamer Dia 1.000|Y
01|201440|15|1|(T23 Optional) Rough Cam Groove|Y
01|201440|17|1|(T24 Optional) Rough  Cam Ext. Profile(Optional Tool)|Y
01|201440|18|1|(T25 Optional) Finish Cam Ext. Profile(Optional Tool)|Y
01|201440|20|1|(T26)          Tool to Finish OD's and Faces|Y
01|201442|1|1|VDI30 Blank Bar A2 Round|Y
01|201442|1|2|ref. 105169|Y
01|201471|1|1|1st Bathc 4/5:DWG Saved in Teams File.|Y
01|201480|2|1|SKJ25-5C >> SK20/SK25 Coolant Cap 5.0mm|Y
01|201480|2|2|Delivery: 2 stock at Nikken Japan/Bal 10 Weeks ARO|Y
01|201530|1|1|HSK125A .750 x 4.0 GL coolant through the nose shrink|Y
01|201530|1|2|MOQ = 2|Y
01|201530|2|1|HSK125A 1.00 x 4.0 GL coolant through the nose shrink|Y
01|201530|2|2|MOQ = 4|Y
01|201531|2|1|This toolholder has a 4.0 gage length.|Y
01|201531|2|2|Special pricing and these are non returnable.|Y
01|201531|2|3|B stands for pre-balanced and balancable.|Y
01|201531|3|1|Minimum Order Quantity 10 holders.|Y
01|201531|5|1|B5007-0025-6.00|Y
01|201531|5|2|BT50 ER25 Collet Chuck High Torque Bearing Nut|Y
01|201531|5|3|Minimum Order Quantity 10 holders.|Y
01|201531|8|1|Another option if they cannot wait for the ER 16 & 25|Y
01|201531|8|2|chucks.|Y
01|201550|1|1|3 in stock in the US remaining pieces 2-3 weeks ARO|Y
01|201563|1|1|Please Note: Discount reflects a complete purchase|Y
01|201563|1|2|order of all items. If quantities change please contact|Y
01|201563|1|3|us for a re-quote.|Y
01|201574|1|1|Final part number: BT40-SF0250-3.54CP-IDU|Y
01|201574|2|1|Final part number: BT40-SF0500-3.54CP-IDU|Y
01|201574|3|1|Final part number: BT40-SF0125-3.54-IDU|Y
01|201574|4|1|Final part number: BT40-SF0625-3.54CP-IDU|Y
01|201585|1|1|RGA#LVR-59841/|Y
01|201585|1|2|Repair of MZMP46-ER32Z-ICE s/n:67932 07|Y
01|201585|1|3|(Mimatic#124854)|Y
01|201585|2|1|Bearings seals and o-rings to be replaced.|Y
01|201588|1|1|CNC302MA SN: 9417C|Y
01|201588|1|2|TAR-59828|Y
01|201589|1|1|TAT-250 SN 2696|Y
01|201589|1|2|TAR-59828|Y
01|201591|1|1|RGA#LVR-59502/|Y
01|201591|1|2|Repair of MZMP46-ER32X-OFF-C s/n:8951 28|Y
01|201591|1|3|(Mimatic#124252)|Y
01|201591|2|1|Bearings seals o-rings and damaged input spindle to|Y
01|201591|2|2|be replaced.|Y
01|201592|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|201604|1|1|2 pc price is the same. Second piece ETA Late September|Y
01|201609|1|1|(T01)          OD Turning - Roughing|Y
01|201609|2|1|(T02)          OD Turning - Finish|Y
01|201609|3|1|(T03 Opt. B)   Milling Spline with R171.4 Cutter|Y
01|201609|4|1|(T05)          Drill 22mm|Y
01|201609|4|2|(T07)          Rough  OD Profile|Y
01|201609|4|3|(T08)          Finish OD Profile|Y
01|201609|5|1|(T09 Opt. A)   Finish Slot Groove Cam|Y
01|201609|5|2|(T11)          Chamfering 1 x Dia 1 and Profile|Y
01|201609|5|3|(T12)          Center Drill|Y
01|201609|10|1|(T20)          Semi-Finish 1 x Dia 1.000|Y
01|201609|10|2|(T21)          Chamfer 3 Sides of 2 x Dia 1.000|Y
01|201609|13|1|(T22)          Reamer Dia 1.000|Y
01|201609|15|1|(T23 Optional) Rough Cam Groove|Y
01|201609|17|1|(T24 Optional) Rough  Cam Ext. Profile(Optional Tool)|Y
01|201609|18|1|(T25 Optional) Finish Cam Ext. Profile(Optional Tool)|Y
01|201609|20|1|(T26)          Tool to Finish OD's and Faces|Y
01|201614|3|1|Virtual Training - 4 hrs. total training can be in|Y
01|201614|3|2|2 hour blocks.|Y
01|201628|1|1|HSK63T-SLT20-100|Y
01|201628|1|2|Pratt & Whitney Part # PT979557 must be etched on|Y
01|201628|1|3|tooling and packaging.|Y
01|201628|2|1|Etch Pratt & Whitney's Part # PT979557 on tooling|Y
01|201628|2|2|ans re-label packaging.|Y
01|201636|5|1|IF TRUNNION BASEPLATE IS NOT PURCHASED L-N SERVICE|Y
01|201636|5|2|WILL NOT INDICATE IN THE TRUNNION BODY.|Y
01|201636|5|3|WE HIGHLY RECOMMEND PURCHASING THE BASE PLATE.|Y
01|201648|5|1|IF TRUNNION BASEPLATE IS NOT PURCHASED L-N SERVICE|Y
01|201648|5|2|WILL NOT INDICATE IN THE TRUNNION BODY.|Y
01|201648|5|3|WE HIGHLY RECOMMEND PURCHASING THE BASE PLATE.|Y
01|201654|2|1|CNC180 Full Over Haul Cost  $10250 (SP DEAL)|Y
01|201654|2|2|Including Basic Repair Brake Parts Repair and|Y
01|201654|2|3|Worm Wheel/Screw Repair. (STD COST: $13375)|Y
01|201654|7|1|Including Motor/Cover/Cables/Labor|Y
01|201659|2|1|CNC260 Full Over Haul Cost $12950(SP DEAL)|Y
01|201659|2|2|Including Basic Repair Brake Parts Repair and|Y
01|201659|2|3|Worm Wheel/Screw Repair. (STD Cost: $14590)|Y
01|201659|9|1|Including Motor/Gearbox/Cables/Labor|Y
01|201665|1|1|Sumitomo part# CT50-06-50EMH|Y
01|201671|1|1|These chucks are made-to-order special from Howa|Y
01|201671|1|2|Mfg lead time is ADA (After DWG Approval)|Y
01|201671|1|3|Quoted as cost plus - Quote is NET pricing to PDQ Only|Y
01|201671|1|4|Because this is a special once a signed approval DWG|Y
01|201671|1|5|is submitted the order can not be cancelled.|Y
01|201674|1|1|Not for Erickson Quick Change|Y
01|201684|10|1|We do not offer BG (Boring Bar Holder) in a 1.1/4|Y
01|201684|10|2|This sleeve will go into the BMT55-BG15Z-C to hold|Y
01|201684|10|3|the 1.1/4.|Y
01|201689|2|1|Wedge Plunger for H037M5|Y
01|201689|3|1|Master Jaws for H037M5|Y
01|201689|3|2|1 SET = 3pcs|Y
01|201689|4|1|Will need information provided via supplied form to LN.|Y
01|201689|4|2|This is a net cost - Please pass throuh to End User.|Y
01|201695|10|1|We do not offer BG (Boring Bar Holder) in a 1.1/4|Y
01|201695|10|2|This sleeve will go into the BMT55-BG15Z-C to hold|Y
01|201695|10|3|the 1.1/4.|Y
01|201696|1|1|ER16.D44.063    IT40 ER16 Collet Chuck Holder|Y
01|201696|2|1|ER16.D44.100    IT40 ER16 Collet Chuck Holder|Y
01|201705|1|1|Reference Mimatic # 193284|Y
01|201705|1|2|BIGLIA BMT55 ER32 STRAIGHT X-AXIS INT/EXT/ ICE|Y
01|201705|1|3|ref drwg# 00059039|Y
01|201713|1|1|Air Brake 5C chuck system|Y
01|201713|2|1|Custom Adapter Plate|Y
01|201713|2|2|to Fit Fadal VH65|Y
01|201713|2|3|** Drawing needed for faceplate at time of order **|Y
01|201720|2|1|Add FN part#|Y
01|201720|2|2|Not returnable|Y
01|201735|2|1|Quoted at Net price for a Romi machine. This will be|Y
01|201735|2|2|a custom positioning block.End User can also make their|Y
01|201735|2|3|own block and our technical department can help them|Y
01|201735|2|4|with that.|Y
01|201745|1|1|SPECIAL ORDER NON-CANCELABLE/NON-RETURNABLE AFTER|Y
01|201745|1|2|RECEIPT OF ORDER|Y
01|201746|1|1|Special Order Non-Cancelable/Non-Returnable ARO|Y
01|201746|1|2|ETA 5+ Weeks after drawing approval|Y
01|201746|1|3|3J Collet 1-3/32|Y
01|201756|1|1|ELBO CONTROLLI E236N PRESETTER W/ CAT40 SPINDLE|Y
01|201756|2|1|CAT50 SPINDLE FOR E236N PRESETTER|Y
01|201756|3|1|CAT40 MASTER GAUGE|Y
01|201756|4|1|CAT50 MASTER GAUGE|Y
01|201756|5|1|LABEL PRINTER FOR E236N PRESETTER|Y
01|201756|6|1|PAPER ROLL FOR 04B080M LABEL PRINTER|Y
01|201763|1|1|Includes cables|N
01|201763|2|1|Includes cables and air/hyd booster|Y
01|201764|1|1|This size is considered special once ordered it cannot|Y
01|201764|1|2|be returned.|Y
01|201780|1|1|Approved by Frank Fullone 8/1/2023|N
01|201780|1|2|Extra discount given for replacement of drill chuck|Y
01|201781|1|1|Includes cables.|Y
01|201782|1|1|FN Manfacturing Part # 4500-1212|Y
01|201790|1|1|ELBO CONTROLLER E346N PRESETTER W/ CAT40 SPINDLE|Y
01|201790|2|1|CAT50 SPINDLE FOR E346N PRESETTER|Y
01|201790|3|1|CAT40 MASTER GAUGE|Y
01|201790|4|1|CAT50 MASTER GAUGE|Y
01|201790|5|1|LABEL PRINTER FOR E346N PRESETTER|Y
01|201790|6|1|PAPER ROLL FOR 04B080M LABEL PRINTER|Y
01|201791|2|1|Mark with customer part# 4500-1212|Y
01|201799|1|1|Net price includes the following parts for assembly|Y
01|201799|1|2|at Lyndex-Nikken: HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|201799|1|3|and customers RFID chip. Holders will be re-balanced.|Y
01|201799|2|1|Net price includes the following parts for assembly|Y
01|201799|2|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|201799|2|3|customer's supplied RFID chip and holder re-balanced.|Y
01|201799|3|1|Net price includes the following parts for assembly|Y
01|201799|3|2|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|201799|3|3|and customers RFID chips. Holders to be re-balanced.|Y
01|201799|42|1|Net price includes the following parts for assembly|Y
01|201799|42|2|at Lyndex-Nikken: HSK63-Tube and customer's supplied|Y
01|201799|42|3|RFID chip and holder re-balanced.|Y
01|201806|2|1|***OPTIONAL***|Y
01|201816|1|1|HSK63F-SM1000-9.50  Per Kohler Print|Y
01|201816|1|2|3 pc price = $418 Net Each|Y
01|201816|1|3|5 pc price = $356 Net Each|Y
01|201816|2|1|H63F-SF0750-9.50 Per Kohler Print|Y
01|201816|2|2|3 pc price = $783.00 Net Each|Y
01|201816|2|3|5 pc price = $522.00 Net Each|Y
01|201816|3|1|H63F-SF0250-9.50 Per Kohler Print|Y
01|201816|3|2|3 pc price = $783.00 Net Each|Y
01|201816|3|3|5 pc price = $522.00 Net Each|Y
01|201816|4|1|H63F-SF0500-9.50 Per Kohler Print|Y
01|201816|4|2|3 pc price = $783.00 Net Each|Y
01|201816|4|3|5 pc price = $522.00 Net Each|Y
01|201826|5|1|Please be sure used tool is presentable for show|Y
01|201837|1|1|HSK63T-180-TH25R-115|Y
01|201837|2|1|HSK63T-180-TH25L-115|Y
01|201837|4|1|63T.125.110.R Axial turning toolholder|Y
01|201837|5|1|63T.125.110.L Axial turning toolholder|Y
01|201837|7|1|C6-180-TH20R-100|Y
01|201837|8|1|C6-180-TH20L-100|Y
01|201844|2|1|Etch TAM211014 on collets and re-package with P&W|Y
01|201844|2|2|part number.|Y
01|201844|4|1|Etch TAM211014 on collets and re-package with P&W|Y
01|201844|4|2|part number.|Y
01|201878|3|1|OPTION#1 - Without Confirmation Switches|Y
01|201878|4|1|OPTION#2 - Includes Confirmation Switches|Y
01|201879|1|1|Delivery 1~2 Weeks|Y
01|201879|2|1|1-Stock at Nikken Japan 1~2 weeks / Bal 10~12 Weeks|Y
01|201884|8|1|RMSS-10.0|Y
01|201884|9|1|PF-RMSS-12.0|Y
01|201884|16|1|NBT30-ZDS16-115|Y
01|201884|16|2|Net price has been quoted no further discount should|Y
01|201884|16|3|be taken.|Y
01|201884|17|1|ZDK16-8|Y
01|201884|17|2|Net price has been quoted no further discount should|Y
01|201884|17|3|be taken|Y
01|201884|18|1|ZDK16-10|Y
01|201884|18|2|Net price has been quoted no further discount should|Y
01|201884|18|3|be taken.|Y
01|201908|6|1|For the 39/64 Collet request|Y
01|201914|2|1|T1|Y
01|201914|5|1|T2|Y
01|201914|8|1|T3|Y
01|201914|11|1|T12|Y
01|201914|14|1|T16|Y
01|201914|21|1|T6|Y
01|201914|24|1|T9|Y
01|201914|27|1|T13|Y
01|201914|30|1|T14|Y
01|201914|33|1|T15|Y
01|201914|36|1|T11|Y
01|201914|39|1|T10|Y
01|201914|42|1|T8|Y
01|201914|45|1|T7|Y
01|201914|48|1|T5|Y
01|201914|51|1|T4|Y
01|201920|6|1|Alternative for ER25 6.5mm|Y
01|201929|1|1|Gently used unit not in orignal packaging and comes|Y
01|201929|1|2|with all accessories. This will come with a 90 days|Y
01|201929|1|3|warranty. Once purchased cannot be returned.|Y
01|201939|5|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALLATION|Y
01|201939|5|2|AND TRAINING.|Y
01|201941|7|1|INCLUDES A TOTAL OF 8 HRS FOR INSTALL & TRAINING|Y
01|201944|1|1|HSK160B-SM1250-3.00|Y
01|201944|1|2|No price break for 6 pcs|Y
01|201948|1|1|OVERSTOCK ** Closeout Promotion! All sales are FINAL!**|Y
01|201963|1|1|RGA#LVR-59825/|Y
01|201963|1|2|Repair of MZMP47-MI50X-OFF-C s/n:71311 01|Y
01|201963|1|3|(Mimatic#123684)|Y
01|201963|2|1|Bearings. seals and o-rings to be replaced|Y
01|201966|1|1|RGA#LVR-59850/|Y
01|201966|1|2|Repair of BMT65-SK20X-ICE s/n:96469 05 (Mimatic#187160)|Y
01|201966|2|1|Bearings seals o-rings and damaged input & output|Y
01|201966|2|2|spindle to be replaced|Y
01|201966|4|1|RGA#LVR-59850/|Y
01|201966|4|2|Repair of BMT65-ER32X s/n:19905287 09 (Mimatic#186489)|Y
01|201966|5|1|Bearings seals and o-rings to be replaced.|Y
01|201970|1|1|With PS-868 Retention Knob installed at factory.|Y
01|201976|1|1|RGA#LVR-59848/|Y
01|201976|1|2|Repair of MZMP47-ER32X-OFF-ICE s/n:73634 07|Y
01|201976|1|3|(Mimatic#124255)|Y
01|201976|2|1|Bearings seals and o-rings to be replaced.|Y
01|201976|4|1|RGA#LVR-59848/|Y
01|201976|4|2|Repair of MZMP47-ER32X-OFF-ICE s/n:73634 08|Y
01|201976|5|1|Bearings seals o-rings and damaged output spindle to|Y
01|201976|5|2|be replaced|Y
01|201976|7|1|RGA#LVR-59848/|Y
01|201976|7|2|Repair of MZMP47-ER32X-OFF-ICE s/n:73634 10|Y
01|201976|8|1|Bearings seals and o-rings to be replaced.|Y
01|201976|10|1|RGA#LVR-59848/|Y
01|201976|10|2|Repair of MZMP47-ER32X-OFF-ICE s/n:86597 01|Y
01|201976|11|1|Bearings seals and o-rings to be replaced.|Y
01|201978|1|1|RGA#LVR-59849/|Y
01|201978|1|2|Repair of MZMP47-ER32Z-ICE s/n:21905828 02|Y
01|201978|1|3|(Mimatic#124864)|Y
01|201978|2|1|Bearings seals o-rings and damaged input spindle to|Y
01|201978|2|2|be replaced.|Y
01|201978|4|1|RGA#LVR-59849/|Y
01|201978|4|2|Repair of MZMP47-ER32Z-ICE s/n:89655 03|Y
01|201978|4|3|(Mimatic#124864)|Y
01|201978|5|1|Bearings seals o-rings and damaged input & output|Y
01|201978|5|2|spindle to be replaced|Y
01|201982|11|1|Includes (3) Collets of any size for free.|Y
01|201997|1|1|1st Batch 7/24KC:DWG Saved in Teams File.|Y
01|201998|1|1|1st Batch|Y
01|201998|2|1|Req.INS/T/P Inspection Required|Y
01|202006|1|1|Non-standard stock-once a PO is received it can not|Y
01|202006|1|2|be cancelled or returned|Y
01|202006|1|3|Quoted at NET pricing|Y
01|202043|1|1|Req.INS/Install E11-NUT&ER11-SCREW(C)|Y
01|202043|2|1|1st Batch/Install E20-NUT&ER20-SCREW(C)|Y
01|202043|3|1|1st Batch/DWG saved in Eng. File|Y
01|202043|4|1|1st Batch/DWG saved in Eng. File|Y
01|202043|5|1|1st Batch/DWG saved in Eng. File|Y
01|202043|6|1|Req.INS/Install SKN-6WK|Y
01|202043|7|1|Req.INS/Install A3/8-24 & 3/4-KEYSET|Y
01|202043|8|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|9|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|10|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|11|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|12|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|13|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|14|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|15|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|16|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|17|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|18|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|19|1|1st Batch/DWG Saved Eng. File.|Y
01|202043|20|1|Req.INS/Install E16-NUT&ER16-SCREW(C)|Y
01|202043|21|1|Req.INS/Install E20-NUT&ER20-SCREW(C)|Y
01|202043|22|1|Req.INS/Install E32-NUT&ER32-SCREW(C)|Y
01|202043|23|1|Req.INS/Install E32-NUT&ER32-SCREW(C)|Y
01|202043|24|1|1st Batch/Install E40-NUT&ER40-SCREW(C)|Y
01|202046|1|1|NSVX400MA QUOTED DOES NOT HAVE MOTOR INSTALLED. THIS|Y
01|202046|1|2|QUOTATION IS FOR THE TABLE ONLY. THE TABLE ALSO DOES|Y
01|202046|1|3|NOT COME WITH A ROTARY JOINT.|Y
01|202047|1|1|10K RPM|Y
01|202047|2|1|10K RPM|Y
01|202047|3|1|6K RPM|Y
01|202049|1|1|NCAT40 DualContact Major Dream SK20 Non_ANSI_STD|Y
01|202049|1|2|15000rpm|Y
01|202049|1|3|NCAT40N-MDSK20-75U|Y
01|202053|30|1|1 piece stock|Y
01|202053|30|2|7 pieces factory stock ETA 2 weeks bal 10~13wks|Y
01|202053|85|1|P/N: SKJ16-7.5C|Y
01|202053|86|1|P/N: SKJ16-7.5|Y
01|202053|87|1|P/N: SK16-7.5C|Y
01|202053|110|1|P/N: SKJ-13.5|Y
01|202053|117|1|P/N: SKJ16-15.5C|Y
01|202053|127|1|P/N: SKJ25-16.5C|Y
01|202053|135|1|P/N: SKJ25-18.5C|Y
01|202053|136|1|P/N: SKJ25-18.5|Y
01|202053|137|1|P/N: SKJ25-19C|Y
01|202053|138|1|P/N: SKJ25-19|Y
01|202053|140|1|P/N: SKJ25-19.5|Y
01|202053|143|1|P/N: SKJ25-20.5C|Y
01|202053|144|1|P/N: SK25-20.5|Y
01|202053|146|1|P/N: SKJ25-21|Y
01|202053|147|1|P/N: SKJ25-21.5C|Y
01|202053|148|1|P/N: SKJ25-21.5|Y
01|202053|150|1|P/N: SKJ25-22|Y
01|202053|151|1|P/N: SKJ25-22.5C|Y
01|202053|152|1|P/N: SKJ25-22.5|Y
01|202053|153|1|P/N: SKJ25-23C|Y
01|202053|154|1|P/N: SKJ25-23|Y
01|202053|155|1|P/N: SKJ25-23.5C|Y
01|202053|156|1|P/N: SKJ25-23.5|Y
01|202053|158|1|P/N: SKJ25-24|Y
01|202053|159|1|P/N: SKJ25-24.5C|Y
01|202053|160|1|P/N: SKJ25-24.5|Y
01|202053|163|1|P/N: SKJ25-25.4C|Y
01|202053|164|1|P/N: SKJ25-25.4|Y
01|202053|185|1|P/N: SKJ25-22.5C|Y
01|202056|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|202058|1|1|New Gears/Gearbox/Motor Cover/Internal Wiring|Y
01|202059|1|1|P/N: CAT50-AF1-30-OH|Y
01|202059|1|2|CAT50 Back Spot Facing - Main Arbor|Y
01|202059|2|1|P/N: BF130-23.89-41.3-67C|Y
01|202059|2|2|ARBOR FOR ABOVE|Y
01|202059|3|1|P/N: 9BF130-23.89-41.3-67C-I|Y
01|202059|3|2|BYTE for above|Y
01|202059|3|3|MOQ = 3pcs|Y
01|202059|4|1|P/N: AFC-15|Y
01|202059|4|2|INSERT for above|Y
01|202059|4|3|MOQ = 10pcs|Y
01|202084|4|1|Please quote this item as a relacement for the|Y
01|202084|4|2|MRAM-ER25ST because of delivery issues. This will also|Y
01|202084|4|3|hold a 1/2 if they cannot wait for the ER25.|Y
01|202088|1|1|$15000 TOOLING CERTIFICATE|Y
01|202093|1|1|5AX-201 ROTARY TABLE WITH AIR/HYDRAULIC BOOSTER BRAKE|Y
01|202093|1|2|CLAMPING FORCE = 588NM ON ROTARY AXIS & 612NM ON|Y
01|202093|1|3|TILT AXIS|Y
01|202093|2|1|5AX-201 WITH PNEUMATIC BRAKE|Y
01|202093|2|2|CLAMPING FORCE = 303NM ON ROTARY AXIS AND 303NM ON|Y
01|202093|2|3|TILT AXIS|Y
01|202093|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|202093|4|1|COMES WITH ALL REQUIRED MOUNTING HARDWARE|Y
01|202093|5|1|FREE $3000 TOOLING CERTIFICATE INCLUDED WITH|Y
01|202093|5|2|PURCHASE OF 5AX-201 ROTARY TABLE.|Y
01|202117|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|202119|1|1|RGA#LVR-59820/|Y
01|202119|1|2|Repair of MNL12-ER40X s/n:A0320 (Alps#T32213)|Y
01|202119|2|1|Bearings o-rings collet nut and spindle to be|Y
01|202119|2|2|replaced.|Y
01|202132|1|1|HSK100A-SK10C-250|Y
01|202150|1|1|OVERSTOCK ** Closeout Promotion! All sales are FINAL!**|Y
01|202150|2|1|OVERSTOCK ** Closeout Promotion! All sales are FINAL!**|Y
01|202150|3|1|OVERSTOCK ** Closeout Promotion! All sales are FINAL!**|Y
01|202151|1|1|TAR-59838|Y
01|202151|1|2|5AX-201YA SN: 5498|Y
01|202151|1|3|TABLE SENT IN FOR TILT AXIS BACKLASH|Y
01|202151|1|4|EVALUATED TABLE ADJUSTED TILT AXIS BACKLASH|Y
01|202151|1|5|INSTALLED NEW SEALS ON MOTOR NEW MOTOR COVER SEAL|Y
01|202151|1|6|CHANGED OIL TEST RAN -> OK|Y
01|202162|1|1|CAT50-HC12-3.250 with Chip Hole Only|Y
01|202162|1|2|UNV 70|Y
01|202162|1|3|GKN to install chip|Y
01|202164|2|1|**Rego Style Mini Nut|Y
01|202165|1|1|ETA is 4 weeks if ordered before 8/28|Y
01|202167|1|1|H63A-SF0375-5.12CP-BD50.1|Y
01|202167|1|2|HSK63A-SF0375-5.12CP with 50.1mm bore depth|Y
01|202196|13|1|I do have NBT40-SF0750-5.12CP in stock  if they want|N
01|202196|13|2|to consider this gage length. List is $429.00 less 45%|N
01|202213|8|1|Lyndex Nikken Part # MZQT5-CT40X-OFF-SUB|Y
01|202213|8|2|Mazak Live CAT40 X-Axis STRT Vertical Offset ExtCoolant|Y
01|202213|8|3|Left Hand Sub Spindle.|Y
01|202213|8|4|This item is considered special once ordered it cannot|Y
01|202213|8|5|be cancelled or returned. Net price has been quoted no|Y
01|202213|8|6|further discount should be taken. Price is same for|Y
01|202213|8|7|1-3 Pcs|Y
01|202216|1|1|This is a net charge to cover our cost per head to have|Y
01|202216|1|2|the current 80mm pitch flat pins converted to 110mm|Y
01|202216|1|3|pitch with a tapered pin.|Y
01|202218|1|1|P/N: BMT65-ER25-AD-ICE|Y
01|202218|1|2|193136|Y
01|202221|1|1|Balance Late November|Y
01|202227|1|1|RGA#LVR-59883/|Y
01|202227|1|2|Repair of OKL3-ER32X s/n:AL771 (Alps#OK101-14000)|Y
01|202227|2|1|Bearings o-rings collet nut and spindle to be|Y
01|202227|2|2|replaced. If the spindle can be reused the cost will|Y
01|202227|2|3|be $1275.20|Y
01|202235|2|1|ADAPTER PLATE FOR JIS A2-8 SPINDLE NOSE|Y
01|202235|3|1|NET COST FOR LYNDEX NIKKEN TO THREAD DRAW SCREW|Y
01|202235|4|1|HARD JAWS FOR HW-10BB-KS2 CHUCK|Y
01|202235|4|2|FACTORY ORDER 3 MONTHS TO MAKE; THESE COULD BE|Y
01|202235|4|3|ORDERED THROUGH MSC THEY LIKELY HAVE HARD JAWS THAT|Y
01|202235|4|4|WILL FIT THIS CHUCK SINCE IT IS KITAGAWA STANDARD|Y
01|202247|1|1|RGA#TAR-59824|Y
01|202247|1|2|5AX-201YA-M SN#5027|Y
01|202256|4|1|Demo 5AX-130BASA-BR2 s/n.5889 from Yamazen|Y
01|202259|1|1|Part # MZQT5-ER32X-OFF-HS2-ICE|Y
01|202259|1|2|Mimatic Part # 193971|Y
01|202259|1|3|Mazak Live ER32 X-Axis STRT Vertical Offset IntExtcoola|Y
01|202259|1|4|2 pc price = $5942.71 net ea.|Y
01|202259|1|5|3 pc price = $5301.13 net ea.|Y
01|202259|1|6|4 pc price = $4979.49 net ea.|Y
01|202259|1|7|5 pc price = $4787.18 net ea.|Y
01|202259|4|1|Lyndex Nikken Part # MZQT5-ER32X|Y
01|202259|4|2|Mazak Live ER32 X-Axis STRT Vertical External coolant|Y
01|202259|4|3|2 pc price = $4404.28 net ea.|Y
01|202259|4|4|3 pc price = $3553.37 net ea.|Y
01|202259|4|5|4 pc price = $2937.32 net ea.|Y
01|202259|4|6|5 pc price = $2857.33 net ea.|Y
01|202259|4|7|ETA = 4 week design + 15 weeks Mfg ADA|Y
01|202262|1|1|NSVX400MA QUOTED DOES NOT HAVE MOTOR INSTALLED. THIS|Y
01|202262|1|2|QUOTATION INCLUDES 7+1 ROTARY JOINT AND TAT-401N|Y
01|202262|1|3|SUPPORT TABLE.|Y
01|202273|1|1|Includes cables|Y
01|202274|1|1|Item is non-standard stock once a PO is received|Y
01|202274|1|2|it can not be cancelled or  returned|Y
01|202290|2|1|Balance of 36 pcs ETA 10-12 Wks|Y
01|202290|4|1|8 pc stock|Y
01|202290|4|2|72 pc ETA 1 Week|Y
01|202290|4|3|Bal 3-4 Weeks|Y
01|202301|5|1|FREE $2000 TOOLING CERTIFICATE FROM OKUMA RED WHITE|Y
01|202301|5|2|& BLUE PROMOTION RUNS THROUGH 09/04/2023|Y
01|202305|1|1|Serial #9336|Y
01|202306|2|1|Installation includes: Dual axis drive short bar|Y
01|202306|2|2|fiber optic cables communication cables bulkhead|Y
01|202306|2|3|cables external cables parameter changes service|Y
01|202306|2|4|time and travel.|Y
01|202307|6|1|P/N: C8-SK10-90|Y
01|202307|6|2|Price quoted at NET price.|Y
01|202307|9|1|Price quoted at NET price.|Y
01|202307|12|1|Price quoted at NET price.|Y
01|202307|15|1|Price quoted at NET price.|Y
01|202307|18|1|P/N: C8-SK20-90|Y
01|202307|21|1|P/N: C8-SK20-225|Y
01|202307|21|2|Price quoted at NET price.|Y
01|202307|26|1|Price quoted at NET price.|Y
01|202307|29|1|Price quoted at NET price.|Y
01|202307|39|1|Price quoted at NET price.|Y
01|202311|1|1|Includes Haas motor and cable set.|Y
01|202317|1|1|Part Number To Be Determined: CAT50 ER25 Angle Head|Y
01|202317|1|2|CAT50; AGH; ER25; 360DEG Adjustable External Coolant|Y
01|202317|1|3|[3 Pins Support Recommended} L=358mm; L1 = 219mm;|Y
01|202317|1|4|1:1 GEAR; MAX 30Nm; 8000 RPM; Wrenches sold seperately.|Y
01|202335|1|1|This is a table only price. Drive unti and cabinet|Y
01|202335|1|2|cables are not included.|Y
01|202335|2|1|Table core deposit promo.|Y
01|202369|1|1|RGA#LVR-59887/|Y
01|202369|1|2|Repair of MRAM-ER11ST s/n:84152 01 (Mimatic#162716)|Y
01|202369|2|1|Bearings seals and o-rings to be replaced.|Y
01|202369|4|1|RGA#LVR-59887/|Y
01|202369|4|2|Repair of MRAM-ER11ST s/n:95069 01 (Mimatic#162716)|Y
01|202369|5|1|Bearings seals and o-rings to be replaced.|Y
01|202370|27|1|QCFC80-016-SMO      1/4 Smooth Collet Set|Y
01|202370|28|1|QCFC80-018-SMO      9/32 Smooth Collet Set|Y
01|202370|31|1|QCFC80-036-SMO      9/16 Smooth Collet Set|Y
01|202370|33|1|QCFC80-044-SMO      9/16 Smooth Collet Set|Y
01|202370|35|1|QCFC80-052-SMO      13/16 Smooth Collet Set|Y
01|202370|36|1|QCFC80-054-SMO      27/32 Smooth Collet Set|Y
01|202370|38|1|QCFC80-062-SMO      31/32 Smooth Collet Set|Y
01|202370|40|1|QCFC80-066-SMO      1-1/32 Smooth Collet Set|Y
01|202370|41|1|QCFC80-068-SMO      1-1/16 Smooth Collet Set|Y
01|202370|43|1|QCFC80-084-SMO      1-5/16 Smooth Collet Set|Y
01|202382|3|1|This will be a 9/25-Trunnion Stallion|Y
01|202382|4|1|2 grid pattern with 1/2-13thread inserts and .501ID|Y
01|202382|4|2|hardened bushings.|Y
01|202382|5|1|Riser to match center height TAT-170 with NCT200|Y
01|202382|7|1|Installation includes: Drive unit short bar fiber|Y
01|202382|7|2|optic cable communications cable bulkhead cables|Y
01|202382|7|3|external cables parameter changes servcie time and|Y
01|202382|7|4|travel.|Y
01|202385|1|1|H-DR-327|Y
01|202385|1|2|NC5-46-SK25-90SA + PS-123-AIR|Y
01|202385|1|3|ETA 9-10 WKS AFTER DRAWING APPROVAL|Y
01|202386|7|1|BT30-SK16-75-J|Y
01|202386|7|2|BT30 Slim Chuck SK16 15000rpm w/J-nut|Y
01|202386|8|1|20-ZMAC42-70AAV|Y
01|202386|8|2|ZMAC Boring Head Advanced|Y
01|202386|10|1|16-ZMAC32-55AAV|Y
01|202386|10|2|ZMAC Boring Head Advanced|Y
01|202386|11|1|SP16-16-30|Y
01|202386|11|2|Modular Boring Bar Spacer|Y
01|202386|12|1|4MP-F4(H1)|Y
01|202386|12|2|Insert Boring Bar (10pc Set)|Y
01|202386|14|1|BT30-SK13-120-J|Y
01|202386|14|2|BT30 Slim Chuck SK13 15000rpm J-Style|Y
01|202387|1|1|Back Spot Face Tool|Y
01|202387|1|2|Cast ironBBT 5025/322-1/8.06.62 to 1.00 open|Y
01|202387|1|3|No Special Requirements|Y
01|202397|1|1|Includes: Nikken indexer with AA21 control box pendant|Y
01|202397|1|2|external cables power cable for control & M-code cable|Y
01|202401|2|1|Alternative for C50RAM-ER11-227ST-80FP|Y
01|202407|1|1|This is a replacement for existing unit.  NO install or|Y
01|202407|1|2|other components are included.|Y
01|202412|1|1|This is a replacement unit only.  NO Installation or|Y
01|202412|1|2|other components are included with this price.|Y
01|202436|4|1|Installation includes: Drive unit short bar fiber|Y
01|202436|4|2|optic cables communications cables bulkhead cables|Y
01|202436|4|3|external cables rebuilding of the APC pivot point|Y
01|202436|4|4|for cable path parameter changes service time and|Y
01|202436|4|5|travel.|Y
01|202443|1|1|Includes an Alpha 8 Motor to increase Rotation Speed|Y
01|202443|1|2|to 66 RPM.|Y
01|202443|3|1|Pricing is for individual installations this can be|Y
01|202443|3|2|adjusted if multiple installations can be scheduled|Y
01|202443|3|3|together.|Y
01|202446|4|1|Req.INS/T/P Inspection Required|Y
01|202446|5|1|Req.INS/T/P Inspection Required|Y
01|202461|5|1|Package pricing includes ten standard inch size SF|Y
01|202461|5|2|holders with less than 6.00 gage lengths and a 200V|Y
01|202461|5|3|shrink fit unit.|Y
01|202467|1|1|T/P Inspection Required|Y
01|202467|2|1|T/P Inspection Required|Y
01|202467|3|1|1st Batch T/P Inspection Required|Y
01|202467|4|1|T/P Inspection Required|Y
01|202467|5|1|T/P Inspection Required|Y
01|202473|1|1|Req.INS/Install E20-NUT&ER20-SCREW(C)|Y
01|202473|2|1|Req.INS/Install SKN-16B|Y
01|202473|3|1|Req.INS/Install SKN-6WK|Y
01|202473|4|1|Req.INS/Install SKN-6WK|Y
01|202473|5|1|Req.INS/Install A3/8-24 & 3/4-KEYSET|Y
01|202473|6|1|Req.INS/Install E16-NUT&ER16-SCREW(C)|Y
01|202473|7|1|Req.INS/Install E20-NUT&ER20-SCREW(C)|Y
01|202473|8|1|Req.INS/Install E32-NUT&ER32-SCREW(C)|Y
01|202473|9|1|Req.INS/Install E32-NUT&ER32-SCREW(C)|Y
01|202473|10|1|Req.INS/Install E40-NUT&ER40-SCREW(C)|Y
01|202498|1|1|5AX-201OSP4-AHB|Y
01|202498|1|2|TAR-59898|Y
01|202498|1|3|CUSTOMER HAD BROKEN BRACKET INSIDE TILT AXIS COVER|Y
01|202498|1|4|AIR/HYD BOOSTER COULD MOVE AND CAUSED FLUID TO LEAK OUT|Y
01|202498|1|5|HAVING BRACKET RE-WELDED CHANGE OIL TEST RUN ETC|Y
01|202502|1|1|Req.INS until tolerance issue gets resolved.|Y
01|202502|2|1|Req.INS until tolerance issue gets resolved.|Y
01|202502|3|1|Req.INS until tolerance issue gets resolved.|Y
01|202502|4|1|T/P Inspection Required|Y
01|202502|5|1|1st Batch T/P Inspection Required|Y
01|202502|6|1|T/P Inspection Required|Y
01|202502|7|1|T/P Inspection Required|Y
01|202502|8|1|T/P Inspection Required|Y
01|202502|9|1|T/P Inspection Required|Y
01|202513|2|1|5 pcs in IL remaining stock in JAPAN 2-3 wks ARO|Y
01|202517|7|1|E346VPLUS has vacuum clamping system|Y
01|202524|1|1|P/N: BMT55-ER25-AD-ICE|Y
01|202524|1|2|BMT55 Live ER25 STRT Adjustable IntExtCoolant 7MP|Y
01|202524|1|3|Mim#196396|Y
01|202528|1|1|Once 7pcs stock is depleted ETA is 13-14 weeks|Y
01|202531|2|1|12-ZMAC25-40AAV|Y
01|202539|1|1|RGA#TAR-59824|Y
01|202539|1|2|5AX-201YA-M SN#5027|Y
01|202539|62|1|Replacement table would be prepped and configured to|Y
01|202539|62|2|match customer's existing table (Serial# 5027).|Y
01|202539|62|3|Customer's existing table would be traded in to Lyndex|Y
01|202539|62|4|Nikken Inc. as part of this special offer.|Y
01|202545|1|1|CAT40-SF1000-|N
01|202550|1|1|No INS Req'd.|Y
01|202550|2|1|No INS Req'd.|Y
01|202550|3|1|No INS Req'd.|Y
01|202550|4|1|No INS Req'd.|Y
01|202554|2|1|** CORE TRADE IN DISCOUNT **|Y
01|202554|2|2|IF WANT TO TRADE IN OLD ONE FOR NEW ONE OR GET NEW ONE|Y
01|202554|2|3|AS BACKUP FOR US TO REPAIR OLD ONE|Y
01|202577|3|1|LCH25-SK16|Y
01|202577|3|2|Straight Shank 25mm SK16 Adjust type Centering Holder|Y
01|202577|8|1|STH25-SK16-130-J|Y
01|202577|8|2|25mm Straight Shank Extension SK16 with Coolabt Nut|Y
01|202577|9|1|LCH25-SK16-J|Y
01|202577|9|2|Adjust type Centering Holder 25mm SK16 with Coolant Nut|Y
01|202577|14|1|SKJ16-4.9C (SK13/SK16 Coolant Thru Cap ID:4.9mm)|Y
01|202577|18|1|LCH32-SZF10S-52|Y
01|202577|18|2|Straight Shank Extension 32mm BullsEye ZeroZero SK10|Y
01|202577|22|1|SK10-4.9AC|Y
01|202577|22|2|SK10 Slim Chuck Collet 4.9mm On Size Coolant Seal|Y
01|202584|2|1|This will be the table brake source and will be inside|Y
01|202584|2|2|rotary table swing box or motor cover.  This will keep|Y
01|202584|2|3|hydraulic braking while simplifying integration and|Y
01|202584|2|4|cable management.|Y
01|202584|3|1|Please also see external notes regarding installation.|Y
01|202585|6|1|NBT30-SK6C-60P-J|Y
01|202585|8|1|HSK63A-SK6C-100P-J|Y
01|202585|62|1|HSK63A-SK20C-120P-J|Y
01|202605|1|1|Note: Item is non-standard stock. Once a PO has been|Y
01|202605|1|2|received it can not be cancelled or returned|Y
01|202605|1|3|Quoted at NET pricing|Y
01|202627|1|1|HSK63A-SF0375-5.12CP  w/ Special 50.1mm depth|Y
01|202632|1|1|KS-AX350R-FA177T|Y
01|202632|1|2|REPLACEMENT TILT AXIS MOTOR COVER|Y
01|202632|1|3|6-8 WEEK DELIVERY|Y
01|202654|1|1|Non-returnable/non-cancellable|Y
01|202662|1|1|Balance ETA 10/30/23|Y
01|202662|3|1|Balance ETA 10/30|Y
01|202671|1|1|This item is discontinued and not returnable.|Y
01|202673|8|1|B4007-0016-3.50-DIN-M|Y
01|202680|3|1|Part # CAT50-C3/4F-105U-IDU-M|Y
01|202680|3|2|Special cannot be cancelled or returned.|Y
01|202680|3|3|Net price has been quoted.|Y
01|202708|4|1|Red White and Blue Okuma Promo|Y
01|202720|1|1|price quoted is the same from 12-36 pcs.|Y
01|202720|1|2|No qty discounts for these qtys.|Y
01|202722|1|1|*Installed with PS-17 pull stud at the factory|Y
01|202722|2|1|*Installed at factory|Y
01|202722|6|1|9TACL63D-B30N46|Y
01|202727|1|1|RGA#LVR-59907/|Y
01|202727|1|2|Repair of MZMP47-ER25-AD s/n:19906393 03|Y
01|202727|1|3|(Mimatic#194630)|Y
01|202727|2|1|Bearings seals and o-rings to be replaced.|Y
01|202751|1|1|Quoted at NET pricing|Y
01|202751|1|2|Item is not standard stock-it can not be cancelled|Y
01|202751|1|3|or returned|Y
01|202758|10|1|***Std Taper - CAT40 - Dual contact n/a 3/8***|Y
01|202758|11|1|***Std Taper - CAT40 - Dual contact n/a 3/8***|Y
01|202802|1|1|RGA#TOR-59935/|Y
01|202802|1|2|Repair of CAT50-UMT200UH|Y
01|202802|3|1|Calibration service included.|Y
01|202808|1|1|Mori Seiki-ALPS Tool-2T3200415B (SLOTTING SPINDLE)|Y
01|202808|1|2|**NO CANCELLATION/NO RETURN**|Y
01|202808|1|3|**Order will be processed after prepayment**|Y
01|202808|2|1|Overhaul of your existing 2T3200415B.|Y
01|202808|2|2|Bearings/Seals/O-rings to be replaced.|Y
01|202822|49|1|*hold 23/64|Y
01|202832|1|1|CENTER DIVIDER ONLY|Y
01|202842|1|1|All sales are final on this item.|Y
01|202858|2|1|ADAPTER PLATE FOR JIS A2-8 SPINDLE NOSE|Y
01|202858|3|1|NET COST FOR LYNDEX NIKKEN TO THREAD DRAW SCREW|Y
01|202858|4|1|HARD JAWS FOR HW-10BB-KS2 CHUCK|Y
01|202858|4|2|FACTORY ORDER 3 MONTHS TO MAKE; THESE COULD BE|Y
01|202858|4|3|ORDERED THROUGH MSC THEY LIKELY HAVE HARD JAWS THAT|Y
01|202858|4|4|WILL FIT THIS CHUCK SINCE IT IS KITAGAWA STANDARD|Y
01|202858|4|5|QUOTED AT NET PRICING|Y
01|202868|1|1|Item is non-standard stock once a PO is received it|Y
01|202868|1|2|can not be cancelled or returned.|Y
01|202896|1|1|Howa H3KBB O-4788C for MC: TAKAMATSU XT-8 sn: 1690169|Y
01|202897|3|1|IF NST300 IS PURCHASED; A SPECIAL ADAPTER PLATE WILL|Y
01|202897|3|2|BE INCLUDED FOR 60MM SPINDLE BORE|Y
01|202902|1|1|M10HZ-85CH(M3)|Y
01|202913|1|1|BT45-Z24-105|Y
01|202927|2|1|BT50-CZF25-165|Y
01|202927|2|2|BT50 Bulls Eye Zero Fit Milling Chuck C25 8000rpm|Y
01|202934|5|1|FREE $2000 TOOLING CERTIFICATE FOR OKUMA RWB PROMO|Y
01|202934|5|2|PROMO ENDS 9/4/2023|Y
01|202940|1|1|RGA#TAR-59895|Y
01|202940|1|2|5AX-DD200BF2 SN:1263|Y
01|202997|7|1|E346VPLUS has vacuum clamping system|Y
01|203000|1|1|1st Batch/948669 Radiac 5/24:DWG Approved/Customer|Y
01|203006|1|1|1st Batch/for stock  4/27 approved by Tim|Y
01|203006|2|1|1st Batch|Y
01|203006|3|1|1st Batch T/P Inspection Required/4/25 approved by Ben|Y
01|203015|1|1|REPLACES TQW-ER25(43)|Y
01|203018|2|1|Design & drawing approval required|Y
01|203018|2|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|203022|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ON MORI|Y
01|203042|2|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|203042|2|2|of spindle drawing information|Y
01|203042|2|3|*net price|Y
01|203056|1|1|MODIFICATION OF CNC302BFA-M -> CNC302OSP4-M (AIR BRAKE)|Y
01|203056|1|2|INCLUDES LABOR/MOTOR/CABLES/GEARS/ETC|Y
01|203056|1|3|DELIVERY WOULD BE 1-2 WEEKS UPON RECIEPT OF TABLE & PO|Y
01|203061|1|1|MIM#195878 DWG#56592|Y
01|203061|1|2|MAZAK LIVE VDI40; HSK50 ADPT OUTPUT 90DEG HEAD;|Y
01|203061|1|3|INT/EXT/ICE L1=130mm;|Y
01|203061|1|4|1:1 GEAR MAX 70Nm; 8500 RPM; 1015PSI|Y
01|203061|1|5|Mazak Typ: SQT-15 with 12-X turret|Y
01|203061|1|6|DRAWING APPROVAL NEEDED|Y
01|203061|1|7|SPECIAL ORDER NON-CANCELABLE/NON-RETURNABLE|Y
01|203061|3|1|MIM#195878 DWG#56592|Y
01|203061|3|2|MAZAK LIVE VDI40; HSK50 ADPT OUTPUT 90DEG HEAD;|Y
01|203061|3|3|INT/EXT/ICE L1=130mm;|Y
01|203061|3|4|1:1 GEAR MAX 70Nm; 8500 RPM; 1015PSI|Y
01|203061|3|5|Mazak Typ: SQT-15 with 12-X turret|Y
01|203061|3|6|DRAWING APPROVAL NEEDED|Y
01|203061|3|7|SPECIAL ORDER NON-CANCELABLE/NON-RETURNABLE|Y
01|203061|5|1|MIM#195878 DWG#56592|Y
01|203061|5|2|MAZAK LIVE VDI40; HSK50 ADPT OUTPUT 90DEG HEAD;|Y
01|203061|5|3|INT/EXT/ICE L1=130mm;|Y
01|203061|5|4|1:1 GEAR MAX 70Nm; 8500 RPM; 1015PSI|Y
01|203061|5|5|Mazak Typ: SQT-15 with 12-X turret|Y
01|203061|5|6|DRAWING APPROVAL NEEDED|Y
01|203061|5|7|SPECIAL ORDER NON-CANCELABLE/NON-RETURNABLE|Y
01|203068|1|1|CAT40-SF1000-6.30 Per Mossberg Drawing|Y
01|203068|1|2|Part Number to be determine and minimum order is 5-PCS|Y
01|203068|1|3|Quoted at NET price.|Y
01|203077|1|1|2 PCS - 2 WEEKS|Y
01|203077|1|2|3RD PIECE - 8 WEEKS|Y
01|203082|1|1|MZQT5-ER25-AD-ICE|Y
01|203082|1|2|ref. 192542|Y
01|203082|3|1|BMT65-ER25-AD-ICE|Y
01|203082|3|2|ref. 193136|Y
01|203094|2|1|NET PRICE|Y
01|203112|2|1|P/N: TBD|Y
01|203112|2|2|Drive Shaft SK50 accoring to ISO7388-1 -->|Y
01|203112|2|3|(forner DIN 69871) complete with standard torque|Y
01|203112|2|4|support according to ISO 9524 and locking device|Y
01|203112|2|5|(without machine-side stop block)> to be adapted to the|Y
01|203112|2|6|BAZ by the customer  For a stable and rigid mounting of|Y
01|203112|2|7|the angle head to the machine we strongly recommend a|Y
01|203112|2|8|3-point support adapted to the machine. Otherwise no|Y
01|203112|2|9|guarantee can be given for any stability problems.|Y
01|203112|2|10|A=80mm / d=18mm|Y
01|203112|3|1|Tool Holder Capto C5; Coolant supply through spindle|Y
01|203112|3|2|and via injection tube; Filter fineness: max. 0.05mm|Y
01|203112|3|3|constant dry run possible with sufficient cooling phase|Y
01|203112|3|4|max. mold temperature 90C; no reversal of direction of|Y
01|203112|3|5|rotation (drive direction equal to output direction)|Y
01|203112|3|6|L1= 109mm; Gear ratio:i(n1/n2)=2.5:1; max. coolant|Y
01|203112|3|7|pressure: p(max)= 70bar; max. torque M(max)= 200Nm|Y
01|203112|3|8|max. input speed: nl(max)= 5000RPM|Y
01|203113|1|1|Final Part Number: NC4001-0750-1.75CP-ID|Y
01|203113|2|1|Final Part Number: NC4001-1000-1.75CP-ID|Y
01|203113|3|1|Chip Hole Install BIS-C-122-11/L supplied by Lyndex|Y
01|203119|2|1|INCLUDES LABOR FOR BASIC CHECKUP AND OIL CHANGE|Y
01|203119|2|2|AND CONVERSION LABOR FROM AIR TO HYD BRAKE|Y
01|203119|8|1|Hydraulic hoses/fittings and wire for connection to|Y
01|203119|8|2|machine|Y
01|203120|14|1|Collapse Range 6.0-5.5mm|Y
01|203175|1|1|CNC260FA SN 12839|Y
01|203175|1|2|TAR-59903|Y
01|203175|20|1|Seals for Rotary Joint - TG5200400-Z80N|Y
01|203178|1|1|REPLACEMENT SPEC FOR CNC260FA-M SN: 12839|Y
01|203178|1|2|REF REPAIR INQUIRY TAR-59903|Y
01|203182|1|1|BT45-Z24-105|Y
01|203182|1|2|Item is non-standard stockonce a PO has been received|Y
01|203182|1|3|it can not be cancelled or returned.Quoted at NET price|Y
01|203184|44|1|NEW TILT AXIS WORM SCREW GEAR|Y
01|203184|44|2|PART # GR-AX101R044|Y
01|203184|45|1|GASKET FOR ROTARY AX|Y
01|203184|45|2|PART # AX101R025|Y
01|203184|46|1|Bearing - part number RU8016CCO|Y
01|203201|1|1|**2pc MIN requirement|Y
01|203201|1|2|*2-4pc $482.00ea/net|Y
01|203201|1|3|*5-9pc $322.00ea/net|Y
01|203201|1|4|*10+pc $215.00ea/net|Y
01|203209|1|1|Part Number TBD: Mimatic #179195|Y
01|203209|1|2|Straight offset tool ER32 Internal Coolant|Y
01|203209|2|1|Part Number TBD: Mimatic #179196|Y
01|203209|2|2|90DEG tool L1=55mm; ER32 Internal Coolant|Y
01|203226|2|1|(3) SK6-6 COLLETS INCLUDED AT NO COST TO DUNCHA|Y
01|203226|3|1|BACKUP SCREWS FOR BT30-SK6-60 TOOLHOLDERS|Y
01|203232|1|1|3 pc price = $12123.00 less 30% --> $8486.10 net each|Y
01|203247|1|1|TOR-59937/|Y
01|203247|1|2|Repair of 2 x W1205-0875-6.3(C)|Y
01|203247|2|1|Deep cleaning deburring and regreasing included.|Y
01|203247|4|1|RGA#TOR-59937/ 1 x W10S5-0875> Unrepairable. Customer|Y
01|203247|4|2|has declined the quote for a REPL. Inspection fee will|Y
01|203247|4|3|be charged. Tool will be scrapped per Taylor(End user)|Y
01|203274|2|1|14-16 weeks|Y
01|203290|1|1|part# TBD|Y
01|203290|1|2|BT30 Blank Bar 6 OD x 6.00projection|Y
01|203290|1|3|**Min Qty Required 3pcs|Y
01|203292|13|1|Special discount applies for E346N|Y
01|203292|13|2|E346N is non-returnable|Y
01|203311|1|1|RGA#CUR-59905/|Y
01|203311|1|2|Repair of H63ARAM-MI50-187-65TP s/n:22906124 02|Y
01|203311|1|3|(Mimatic#180273)|Y
01|203311|2|1|Bearings seals and o-rings to be replaced.|Y
01|203312|1|1|CAT50-SF16-160CP W/2-HOLE DIN MODIFICATION|Y
01|203322|6|1|*special discount of additional 20% to be passed on to|Y
01|203322|6|2|your customer|Y
01|203322|6|3|Final Sale-non-returnable|Y
01|203325|1|1|P/N: TBD  Mimatic 140066|Y
01|203325|1|2|Special Angle Head HSK63 Weldon; diameter 12mm|Y
01|203325|1|3|similiar dimension drawing 771WGX030053973ST-1|Y
01|203325|1|4|(mimatic 197163/200688|Y
01|203327|1|1|RGA#LVR-59953/|Y
01|203327|1|2|Repair of MNZ20-SK16X-ICE-12K  s/n:20902074 02|Y
01|203327|1|3|(Mimatic#193568)|Y
01|203327|2|1|Bearings seals and o-rings to be replaced.|Y
01|203327|4|1|RGA#LVR-59953/|Y
01|203327|4|2|Repair of MNZ20-SK16X-ICE-12K  s/n:20905017 17|Y
01|203327|4|3|(Mimatic#193568)|Y
01|203327|5|1|Bearings seals o-rings & damaged spindle to be|Y
01|203327|5|2|replaced.|Y
01|203327|7|1|RGA#LVR-59953/|Y
01|203327|7|2|Repair of MNZ20-SK16Z-ICE-12K s/n:120902100 02|Y
01|203327|7|3|(Mimatic#193643)|Y
01|203327|8|1|Bearings seals and o-rings to be replaced.|Y
01|203357|1|1|CAT50-SF1000-3.94CP-IDI|Y
01|203357|2|1|LN supply's BIS C-122-04/L and installs. Rebalanced at|Y
01|203357|2|2|final assembly|Y
01|203357|2|3|NET PRICE QUOTE FOR THIS LINE NO FURTHER DISCOUNTS|Y
01|203357|4|1|CAT50-SF1250-3.94CP-IDI|Y
01|203357|5|1|LN supply's BIS C-122-04/L and installs. Rebalanced at|Y
01|203357|5|2|final assembly|Y
01|203357|5|3|NET PRICE QUOTED FOR THIS LINE NO FURTHER DISCOUNTS|Y
01|203379|3|1|INCLUDES ALL TRAVEL EXPENSES TO CENTREVILLE AL &|Y
01|203379|3|2|2 FULL DAYS FOR INSTALLATION OF 5AX-201 ON SV3|Y
01|203381|3|1|INCLUDES ALL TRAVEL EXPENSES TO CENTREVILLE AL &|Y
01|203381|3|2|2 FULL DAYS FOR INSTALLATION OF 5AX-201 ON SV3|Y
01|203384|56|1|SPECIAL CANNOT BE CANCELED OR RETURNED|Y
01|203391|1|1|Includes Haas Motors and Cable Set|Y
01|203391|2|1|This Rotary Joint has a max of 1000 lbs. PSI.|Y
01|203405|1|1|Mimatic RPS Reaming Holder 5XD 16mm Steel Shank Version|Y
01|203405|1|2|For RPK40J Inserts|Y
01|203405|2|1|Mimatic PolyREAM insert RPK40J (12 to 16mm diameter)|Y
01|203405|4|1|Mimatic RPS Reaming Holder 4XD 12mm Carbide Shank|Y
01|203405|4|2|Version for RPG40G Inserts|Y
01|203405|5|1|Mimatic PolyREAM insert RPG40G (<12mm diameter)|Y
01|203406|1|1|MIM#160053|Y
01|203406|1|2|PolySaw Shank|Y
01|203406|2|1|MIM#166425|Y
01|203406|2|2|80mm x 1.5w x 40T PolySAW Blade|Y
01|203434|1|1|4pc in IL remaining balance 12-14 weeks|Y
01|203434|1|2|Delivery is from receipt of final signed approval|Y
01|203434|1|3|drawing|Y
01|203440|3|1|External Cables (cutting area)|Y
01|203440|3|2|Length TBD at time of order|Y
01|203442|5|1|Package pricing includes ten standard inch size SF|Y
01|203442|5|2|holders with less than 6.00 gage lengths and a 200V|Y
01|203442|5|3|or 380V shrink fit unit.|Y
01|203442|6|1|Package pricing includes ten standard inch size SF|Y
01|203442|6|2|holders with less than 6.00 gage lengths and a 200V|Y
01|203442|6|3|or 380V shrink fit unit.|Y
01|203446|5|1|Please NOTE: SKN-10B(GH) was discontinued.|Y
01|203461|5|1|part# TBD|Y
01|203461|5|2|ER32 17p Set Mechanical Coolant 64th increments ONLY|Y
01|203461|7|1|part# TBD|Y
01|203461|7|2|ER16 10p Set Mechanical Coolant 64th increments only|Y
01|203463|1|1|HRT-310 8 3-Jaw Chuck|Y
01|203476|1|1|Quote at NET pricing|Y
01|203476|1|2|Item is non-standard stock once PO has been|Y
01|203476|1|3|received it can not be cancelled or returned|Y
01|203483|1|1|Item is non-standard stock and can not be cancelled|Y
01|203483|1|2|or returned|Y
01|203483|1|3|Quoted at NET pricing|Y
01|203485|4|1|P/N: C8-SK10-90|Y
01|203485|6|1|Price quoted is NET price|Y
01|203485|7|1|P/N: C8-SK20-90|Y
01|203485|7|2|Price quoted is NET price|Y
01|203485|9|1|P/N: C8-SK20-225|Y
01|203485|9|2|Price quoted at NET price|Y
01|203485|10|1|Price quoted at NET price|Y
01|203485|12|1|Price quoted at NET price|Y
01|203491|1|1|This item has been discontinued and we only have 1-pc|Y
01|203491|1|2|in stock. Replacement is NB3007-0025-4.00G  and these|Y
01|203491|1|3|are used with the wrenches quoted.|Y
01|203509|1|1|NET PRICE FOR DEMO UNIT|Y
01|203519|1|1|SK16-11/32AC|Y
01|203519|1|2|SK16 Slim Chuck Collet 11/32 On Size Mechanical|Y
01|203519|1|3|Coolant Seal|Y
01|203523|1|1|Modified tool holder. This cannot be cancelled or|Y
01|203523|1|2|returned.|Y
01|203537|1|1|E346+ PRESETTER W/ HSK63A SPINDLE|Y
01|203537|2|1|SPINDLE FOR CAT40/BT40|Y
01|203537|3|1|SPINDLE FOR CAT50/BT50|Y
01|203537|4|1|E346+ PRESETTER TABLE W/ SPINDLE RACK|Y
01|203537|5|1|CAT40 MASTER GAUGE FOR CALBRATION|Y
01|203537|6|1|CAT50 MASTER GAUGE FOR CALIBRATION|Y
01|203537|7|1|HSK63A MASTER GAUGE FOR CALIBRATION|Y
01|203537|8|1|LABEL PRINTER FOR E346+|Y
01|203537|9|1|LABEL PAPER ROLL FOR QL800 PRINTER|Y
01|203541|1|1|E346+ PRESETTER W/ HSK63A SPINDLE|Y
01|203541|2|1|SPINDLE FOR CAT40/BT40|Y
01|203541|3|1|SPINDLE FOR CAT50/BT50|Y
01|203541|4|1|E346+ PRESETTER TABLE W/ SPINDLE RACK|Y
01|203541|5|1|CAT40 MASTER GAUGE FOR CALBRATION|Y
01|203541|6|1|CAT50 MASTER GAUGE FOR CALIBRATION|Y
01|203541|7|1|HSK63A MASTER GAUGE FOR CALIBRATION|Y
01|203541|8|1|LABEL PRINTER FOR E346+|Y
01|203541|9|1|LABEL PAPER ROLL FOR QL800 PRINTER|Y
01|203548|1|1|E346+ PRESETTER W/ HSK63A SPINDLE|Y
01|203548|2|1|SPINDLE FOR CAT40/BT40|Y
01|203548|3|1|SPINDLE FOR CAT50/BT50|Y
01|203548|4|1|E346+ PRESETTER TABLE W/ SPINDLE RACK|Y
01|203548|5|1|CAT40 MASTER GAUGE FOR CALBRATION|Y
01|203548|6|1|CAT50 MASTER GAUGE FOR CALIBRATION|Y
01|203548|7|1|HSK63A MASTER GAUGE FOR CALIBRATION|Y
01|203548|8|1|LABEL PRINTER FOR E346+|Y
01|203548|9|1|LABEL PAPER ROLL FOR QL800 PRINTER|Y
01|203549|1|1|C5- Boring Bar .500|Y
01|203549|2|1|C5- Boring Bar .625|Y
01|203568|5|1|3-5 Days after design approval|Y
01|203568|5|2|non-cancelable/non-returnable|Y
01|203568|5|3|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|203580|1|1|CNC401BFA / replacment (SR#7033)|Y
01|203580|1|2|Includes RJ (8P)|Y
01|203580|1|3|No Slot on face plate|Y
01|203580|1|4|MFG 10 weeks + Shipping upon PO|Y
01|203580|1|5|No refund No cancelation uopn PO|Y
01|203585|1|1|NC4001-16-35|Y
01|203585|2|1|NC4001-22-40CP|Y
01|203586|2|1|Onsite complete with hoses and hardware|Y
01|203614|2|1|part# C6-Q26-50|Y
01|203614|2|2|Polygon C6 Modular Boring Base/Master Holder|Y
01|203617|2|1|SEALED THRU COOLANT ON SIZE 7MM COLLET|Y
01|203617|3|1|SEALED THRU COOLANT ON SIZE 8MM COLLET|Y
01|203618|1|1|Main Arbor for CAT50 Automatic Back Spot Facing Tool|Y
01|203618|2|1|BF130-12.7-27R1.5-19.1C - Arbor for above Line|Y
01|203618|3|1|Minimum order quantity for this line is 5 pcs|Y
01|203618|3|2|9BF130-12.7-27R1.5-19.1C-W - Byte for above line|Y
01|203629|6|1|Quoted at NET price.|Y
01|203630|1|1|E46LA 50 TAPER PRESETTER WITH 2 CAMERAS|Y
01|203632|1|1|E46L 50 TAPER PRESETTER WITH 2 CAMERAS|Y
01|203641|1|1|#8 on parts list diagram|Y
01|203641|2|1|#9 on parts list diagram|Y
01|203642|1|1|RGA#LVR-59976/|Y
01|203642|1|2|Repair of MZMP47-ER32X-OFF-C s/n: 94917 01|Y
01|203642|1|3|(Mimatic#124255)|Y
01|203642|2|1|Bearings seals and o-rings to be replaced.|Y
01|203644|1|1|P/N: NC4001-0750-11.00|Y
01|203644|2|1|P/N: HSK63A-SM0750-11.00|Y
01|203647|1|1|H05C80H K-43|Y
01|203655|2|1|Comment for SK16-1/4A Line#2|Y
01|203663|1|1|BT30-NPU13-100|Y
01|203672|1|1|Req.INS/Install E11-NUT & ER11-SCREW(C)|Y
01|203672|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|203672|3|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|203672|4|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|203672|5|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|203672|6|1|1st Batch/Install E16-NUT & ER16-SCREW(C)|Y
01|203672|7|1|Req.INS/Install E20-NUT-G & ER20-SCREW(C)|Y
01|203672|8|1|Req.INS/Install E25-NUT-G & ER25-SCREW(C)|Y
01|203672|9|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|203672|10|1|Req.INS/Install E20-NUT-G & ER20-SCREW(C)|Y
01|203672|11|1|Req.INS/Install E32-NUT-G & ER32-SCREW(C)|Y
01|203691|1|1|RGA#LVR-59973/|Y
01|203691|1|2|Repair of MNL12-ER32Z-ICE-10K  s/n:8918810|Y
01|203691|1|3|(Mimatic#101523)|Y
01|203691|2|1|Bearings seals and o-rings to be replaced.|Y
01|203698|1|1|RGA#TAR-59888|Y
01|203698|1|2|5AX-201YA SN:5085|Y
01|203709|2|1|Includes: Disabling the 5th axis providing jumper|Y
01|203709|2|2|setting parameters for the new 4th axis new 4th axis|Y
01|203709|2|3|cables and service time and travel.|Y
01|203713|1|1|NET price each|Y
01|203715|1|1|RGA#LVR-59942/|Y
01|203715|1|2|Repair of MZQT47-ER32Z-MS-OFF  s/n:21900363 01|Y
01|203715|1|3|(Mimatic#183779)|Y
01|203715|2|1|Bearings seals and o-rings to be replaced.|Y
01|203753|1|1|BRM-3.0|Y
01|203753|2|1|BRM-4.0|Y
01|203753|3|1|BRM-5.0|Y
01|203753|7|1|BRM-12.0|Y
01|203753|11|1|BRM-25.0|Y
01|203759|2|1|Lyndex-Nikken to thread draw screw upon final spec.|Y
01|203759|2|2|*Net Charge|Y
01|203776|2|1|CAT40 works on all but E410H model|Y
01|203776|3|1|CAT50 works on all but E500/650 model|Y
01|203776|4|1|HSK100A works on all models|Y
01|203776|20|1|C8 Test Bar|Y
01|203776|20|2|Diameter: 40mm Gage Length: 320mm|Y
01|203785|1|1|THE DISCOUNT GIVEN IS FOR A DEMO UNIT.  THE|Y
01|203785|1|2|WARRANTY WILL BE 1 YEAR.  THE SAME AS A NEW UNIT|Y
01|203786|2|1|Note: Item is non-standard stock once a PO has been|Y
01|203786|2|2|received it cannot be cancelled or returned.|Y
01|203786|2|3|Signed approval drawing required to place order.|Y
01|203786|2|4|Delivery is 19-20 weeks after approved drawing and PO|Y
01|203786|2|5|have been received.|Y
01|203788|1|1|*Special*|Y
01|203790|1|1|Includes: Table with motors Nikken AA21 control|Y
01|203790|1|2|external cablingpendant for programmming power cable|Y
01|203790|1|3|and M-code cable.|Y
01|203806|1|1|1 in stock remaining pcs 12wks ARO|Y
01|203806|2|1|1 in stock remaining pcs 12wks ARO|Y
01|203820|2|1|Discount reflects a purchase order of 11~20 tools.|Y
01|203821|2|1|Northfield Model 650 Air only 6 chuck air tube|Y
01|203821|2|2|rotary joint manual valve filter regulator and|Y
01|203821|2|3|bushing.|Y
01|203831|11|1|CAT40-HC0625-2.50  CAT40 Hydraulic Chuck 5/8|Y
01|203831|11|2|Please Note: This holder is Special. Once a purchase|Y
01|203831|11|3|order is placed it cannot be cancelled or returned.|Y
01|203831|11|4|Approval drawing will be sent for customer signature|Y
01|203831|11|5|once a purchase order is placed.|Y
01|203831|12|1|CAT40-HC0625-4.00  CAT40 Hydraulic Chuck 5/8|Y
01|203831|12|2|Please Note: This holder is Special. Once a purchase|Y
01|203831|12|3|order is placed it cannot be cancelled or returned.|Y
01|203831|12|4|Approval drawing will be sent for customer signature|Y
01|203831|12|5|once a purchase order is placed.|Y
01|203833|2|1|this is a special non-cancelable - non-returnable|Y
01|203864|2|1|Only 7pcs left item is discontinued no replacement|Y
01|203867|2|1|Non Returnable.|Y
01|203872|1|1|RGA#LVR-59992/|Y
01|203872|1|2|Repair of MZMP5-ER40X-OFF-ICE  s/n:81196 02|Y
01|203872|1|3|(Mimatic#131566)|Y
01|203872|2|1|Bearings seals and o-rings to be replaced.|Y
01|203873|16|1|NET PRICE|Y
01|203884|1|1|Special Cannot be cancelled or returned.|Y
01|203884|2|1|standard in stock alternative|Y
01|203884|3|1|Special Cannot be cancelled or returned.|Y
01|203884|3|2|Stock at Nikken Japan|Y
01|203884|4|1|standard in stock alternative|Y
01|203897|2|1|19 mm thick subplate- cust needs to reach 189mm center|Y
01|203898|2|1|19mm thick plate-wants to be at 189 mm center height|Y
01|203900|2|1|***TOOLING FOR 3/4 DRILL***|Y
01|203900|5|1|***TOOLING FOR 1/2 ENDMILL***|Y
01|203900|8|1|***TOOLING FOR 3/8 ENDMILL***|Y
01|203900|10|1|***TOOLING FOR .159 DRILL***|Y
01|203900|13|1|***TOOLING FOR 10-32 TAP***|Y
01|203900|17|1|***TOOLING FOR 1/2 3/8 & 1/4 COLLETS***|Y
01|203901|2|1|We cannot etch collets as they are to small. However|Y
01|203901|2|2|we can re-label boxes with Bombardier # GC000649|Y
01|203907|1|1|RGA#TAR-59989|Y
01|203907|1|2|5AX-200TD sn:1697|Y
01|203907|21|1|9TLU-5AX200TD|Y
01|203910|1|1|1st Batch|Y
01|203926|2|1|Model 450 4 Air Chuck only air tube rotary joint|Y
01|203926|2|2|manual valve filter regulator and bushing|Y
01|203935|4|1|HSK100A-MDSK25-140-IDU HSK100A Major Dream SK25|Y
01|203935|4|2|10000rpm  With ID Chip Hole|Y
01|203936|1|1|102771|Y
01|203936|1|2|Mazak Live ER25 STRT Adjustable+/-107Deg 1:2 12Krpm|Y
01|203936|1|3|IntExtClnt7MP|Y
01|203936|1|4|L1=130mm|Y
01|203936|1|5|L1-185.5mm|Y
01|203940|1|1|Special demo unit pricing|Y
01|203940|1|2|Table has been dispalyed but not cut on comes with full|Y
01|203940|1|3|warranty.|Y
01|203940|3|1|Includes: Dual axis drive short bar fiber optic cable|Y
01|203940|3|2|communications cable bulkhead cables external cables|Y
01|203940|3|3|parameter changes service time and travel.|Y
01|203945|2|1|NET charge per Modification for 10 ea per below sizes:|Y
01|203945|2|2|5/8 Hex x .375 deep with .610/.620 thru hole|Y
01|203945|2|3|11/16 Hex x .375 deep with .530/.562 thru hole|Y
01|203945|2|4|3/4 Hex x .375 deep with .735/.745 thru hole|Y
01|203945|2|5|15/16 Hex x .500 deep with .860/.870 thru hole|Y
01|203945|2|6|1 Hex x .500 deep with .985/.995 thru hole|Y
01|203945|2|7|Drilled holes in hex corners to the same depth will be|Y
01|203945|2|8|required for manufacturing purposes.|Y
01|203945|2|9|*Custom Modification once PO is issued it cannot be|Y
01|203945|2|10|cancelled or Parts returned.|Y
01|203958|1|1|102771|Y
01|203958|1|2|Mazak Live ER25 STRT Adjustable+/-107Deg 1:2 12Krpm|Y
01|203958|1|3|IntExtClnt7MP|Y
01|203958|1|4|L1=130mm|Y
01|203958|1|5|L1-185.5mm|Y
01|203970|1|1|1pc at the factory in stock|Y
01|203970|1|2|ETA for additional pieces is the week of 12/11/2023|Y
01|203974|1|1|1st Batch|Y
01|204007|4|1|**non-coolant|Y
01|204007|7|1|*non-coolant|Y
01|204022|1|1|Dual Outputs (ER25Z-MS-ICE)|Y
01|204022|1|2|Design 3-4 weeks plus time for design approval from|Y
01|204022|1|3|customer. 16-17 Weeks AFTER design approval|Y
01|204022|2|1|ER25X-ICE|Y
01|204022|2|2|Design 3-4 weeks plus time for design approval from|Y
01|204022|2|3|customer. 16-17 Weeks AFTER design approval|Y
01|204022|3|1|ER25Z-ICE|Y
01|204022|3|2|Design 3-4 weeks plus time for design approval from|Y
01|204022|3|3|customer. 16-17 Weeks AFTER design approval|Y
01|204038|1|1|MIM#203299 DWG#62343|Y
01|204038|1|2|2-3 WKS FOR DESIGN 14-16 WKS AFTER DESIGN APPROVAL|Y
01|204038|1|3|Mazak Live MI50 Z-Axis 90Deg OffsetMainSub HORZ|Y
01|204038|1|4|IntExtCoolant 7MP central back-offset (90 degrees)|Y
01|204038|1|5|(A=35mm) for main-spindle version|Y
01|204038|2|1|MIM#203299 DWG#62343|Y
01|204038|2|2|2-3 WKS FOR DESIGN 14-16 WKS AFTER DESIGN APPROVAL|Y
01|204038|2|3|Mazak Live MI50 Z-Axis 90Deg OffsetMainSub HORZ|Y
01|204038|2|4|IntExtCoolant 7MP central back-offset (90 degrees)|Y
01|204038|2|5|(A=35mm) for main-spindle version|Y
01|204046|1|1|RGA#LVR-60001/|Y
01|204046|1|2|Repair of OKL3-ER32Z s/n:AL1159 (Alps#OK101-13000)|Y
01|204046|2|1|Bearings o-rings collet nut and spindle to be|Y
01|204046|2|2|replaced.|Y
01|204059|1|1|P/N: C4001-0500-9.50|Y
01|204059|2|1|P/N: C4001-0750-11.00|Y
01|204059|3|1|P/N: C4001-0750-9.50|Y
01|204059|4|1|P/N: C4001-0500-11.00|Y
01|204062|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|204062|3|2|INCLUDED AT NO COST TO HFO TRIDENT|Y
01|204062|4|1|$4000 TOOLING CERTIFICATE FOR SEPTEMBER ROTARY|Y
01|204062|4|2|TABLE SALES PROMOTION. FREE TO END USER.|Y
01|204065|1|1|RGA#LVR-60007/|Y
01|204065|1|2|Repair of MNL12-ER32Z-MS-10K s/n:A0076|Y
01|204065|1|3|(Alps#MSA01-3W000S)|Y
01|204065|2|1|Bearings o-rings collect nuts and spindle to be|Y
01|204065|2|2|replaced.|Y
01|204071|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|204071|3|2|INCLUDED AT NO COST TO HFO TRIDENT|Y
01|204071|4|1|$4000 TOOLING CERTIFICATE FOR SEPTEMBER ROTARY|Y
01|204071|4|2|TABLE SALES PROMOTION. FREE TO END USER.|Y
01|204082|1|1|2 pc price = $10733.30 net each|Y
01|204082|1|2|3 pc price = $9121.69 net each|Y
01|204083|1|1|2 pc price = $12581.46 net each|Y
01|204083|1|2|3 pc price = $10826.90 net each|Y
01|204094|1|1|new part# C5006-0750-6.00DIN-M|Y
01|204094|1|2|CAT50 3/4 End Mill Holder w/ 6 Gage Length|Y
01|204094|1|3|Modified DIN 2-Holes|Y
01|204094|1|4|Special: cannot be cancelled or returned|Y
01|204094|1|5|NET Price|Y
01|204095|1|1|CNCZ180LSA-BR2|Y
01|204095|1|2|SN 20250T|Y
01|204095|1|3|TAR-59998|Y
01|204095|1|4|ISSUE BRAKE NOT HOLDING -> CHECKED BRAKE SYSTEM|Y
01|204095|1|5|NEEDS NEW SEALS TABLE NEEDS NEW SEALS AND BEARINGS|Y
01|204095|1|6|BACKLASH IS HIGH CAN BE ADJUSTED|Y
01|204095|1|7|BRAKE PISTON AND PILOT FLANGE HAS RUST/PITTING AROUND|Y
01|204095|1|8|O-RING CONTACT CAUSING LEAK NEED TO REPLACE BOTH|Y
01|204095|1|9|ITEMS|Y
01|204131|1|1|Part # C4006-0125-4.00 But with a 8-32 thread set screw|Y
01|204131|1|2|20 pc price = $138.00 net each|Y
01|204138|1|1|30Nm Torque Output Rating|Y
01|204138|5|1|70Nm Torque Output Rating|Y
01|204147|1|1|12mm Straight Shank Extension BCB Boring Bar|Y
01|204151|1|1|*Qty Break Pricing:|N
01|204151|1|2|1-2pcs List $5093.00/ less 25%|N
01|204151|1|3|3-4pcs List $5093.00/ less 30%|N
01|204155|1|1|Replaces TQW-150|Y
01|204159|1|1|HSK63F-SM1000-2.50CP HSK63F Shell Mill Holder 1 with|Y
01|204159|1|2|2.50 gage length. No Makino Drive Pins|Y
01|204159|1|3|Quoted with Coolant Ports & Minimum order 5-pcs.|Y
01|204159|2|1|HSK63F-SM1000-2.50CP HSK63F Shell Mill Holder 1 with|Y
01|204159|2|2|2.50 gage length. Quoted with the Makino drive pins.|Y
01|204159|2|3|Quoted with Coolant Ports & Minimum order 5-pcs.|Y
01|204165|3|1|HSK63A-SK25-90P|Y
01|204165|3|2|Special - non cancelable non-returnable|Y
01|204169|3|1|HSK63A-SK25-90P|Y
01|204169|3|2|Special - non cancelable non-returnable|Y
01|204172|8|1|NET PRICE|Y
01|204174|1|1|RGA#CUR-60028/|Y
01|204174|1|2|Repair of H100A-MRAM s/n:20902557 02 (Mimatic#162738)|Y
01|204174|2|1|Bearings seals and o-rings to be replaced.|Y
01|204175|3|1|HSK63A-SK25-90P|Y
01|204175|3|2|Special - non cancelable non-returnable|Y
01|204177|14|1|INCLUDES TWO 8 HOUR DAYS FOR INSTALLATION & TRANING|Y
01|204179|1|1|Max Vertical Capacity - 2000 kg|Y
01|204179|1|2|Max Horizontal Capacity - 4000 kg|Y
01|204179|2|1|Horizontal application only|Y
01|204179|2|2|Max weight on table = 7000 kg|Y
01|204198|2|1|Lyndex Nikken Part # C50RAM-ER25-180IC-110T|Y
01|204198|2|2|CAT50 Angle Head ER25 IntCoolant 110mm Pitch Tapered|Y
01|204198|7|1|Lyndex Nikken Part # C50RAM-ER32-180IC-110T|Y
01|204198|7|2|CAT50 Angle Head ER32 IntCoolant 110mm Pitch Tapered|Y
01|204210|7|1|Cable Set|Y
01|204210|15|1|Cable Set|Y
01|204228|1|1|ER50 35mm|Y
01|204234|2|1|CAT40-SK20-90U-J-IDU|Y
01|204242|2|1|ETA 10-12 WEEKS ARO|Y
01|204242|2|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|204246|6|1|2 Pieces in stock in IL|Y
01|204246|6|2|Remaining pieces ETA is the week of 12/11/23|Y
01|204251|4|1|(135mm length also available.)|Y
01|204251|8|1|(NOTE!  This is a one-time special list price.)|Y
01|204252|1|1|These are special order|Y
01|204252|1|2|non-cancelable non-returnable after receipt of order|Y
01|204253|1|1|NC5006-1250-2.00|Y
01|204253|1|2|NCAT50 DualContact End Mill Holder 1.1/4 IdChipHole|Y
01|204281|1|1|E346+ PRESETTER W/ HSK63A SPINDLE|Y
01|204281|2|1|SPINDLE FOR CAT40/BT40|Y
01|204281|3|1|SPINDLE FOR CAT50/BT50|Y
01|204281|4|1|E346+ PRESETTER TABLE W/ SPINDLE RACK|Y
01|204281|5|1|CAT40 MASTER GAUGE FOR CALBRATION|Y
01|204281|6|1|CAT50 MASTER GAUGE FOR CALIBRATION|Y
01|204281|7|1|HSK63A MASTER GAUGE FOR CALIBRATION|Y
01|204281|8|1|LABEL PRINTER FOR E346+|Y
01|204281|9|1|LABEL PAPER ROLL FOR QL800 PRINTER|Y
01|204290|1|1|Mimatic RPS Reaming Holder 5XD 16mm Steel Shank Version|Y
01|204290|1|2|For RPK40J Inserts|Y
01|204290|2|1|Mimatic PolyREAM insert RPK40J for .535 diameter.|Y
01|204312|1|1|1 in stock - 10-12 WEEKS ARO for ADD'L Pieces|Y
01|204323|1|1|RGA#LVR-60017/|Y
01|204323|1|2|Repair of MNL12-ER32X s/n:A8225 (Alps#T32206)|Y
01|204323|2|1|Bearings seals o-rings collet nut and spindle to be|Y
01|204323|2|2|replaced.|Y
01|204325|1|1|BT50-ZMAC 70-240|Y
01|204325|1|2|Special: cannot be cancelled or returned|Y
01|204326|1|1|1st Batch|Y
01|204326|2|1|1st Batch|Y
01|204326|4|1|1st Batch/(2)947673  4/28 approved|Y
01|204326|5|1|Req.INS/T/P Inspection Required|Y
01|204326|6|1|1st Batch|Y
01|204328|1|1|1st Batch|Y
01|204332|1|1|1st BatchMFG20-24wks(10/E)UPD5/11>>12/B B|Y
01|204332|2|1|1st Batch  9/2/22 approved by BenMFG12/15>9/15#109UPD8|Y
01|204332|3|1|Req.INS/T/P Inspection Required|Y
01|204332|4|1|Req.INS/T/P Inspection Required|Y
01|204332|5|1|Req.INS/T/P Inspection Required|Y
01|204332|6|1|Req.INS/T/P Inspection Required|Y
01|204332|7|1|Req.INS/T/P Inspection Required|Y
01|204332|8|1|Req.INS/T/P Inspection Required|Y
01|204332|9|1|Req.INS/T/P Inspection Required|Y
01|204332|10|1|Req.INS/T/P Inspection Required|Y
01|204332|11|1|1st batch|Y
01|204332|12|1|1st batch|Y
01|204332|13|1|1st batch|Y
01|204346|2|1|Turn down bolt head diameter from 16.5mm to 14.5mm|Y
01|204354|1|1|P/N: HSK63A-SM0500-9.50|Y
01|204354|2|1|P/N: HSK63A-SM0750-11.00|Y
01|204354|3|1|P/N: HSK63A-SM0750-9.50|Y
01|204354|4|1|P/N: HSK63A-SM0500-11.00|Y
01|204365|3|1|Special|Y
01|204368|1|1|E50-1378    (ER50 35mm Collet)|Y
01|204374|1|1|NBT50-FMA31.75-105|Y
01|204374|1|2|Quoted at NET pricing|Y
01|204374|2|1|NBT50-FMA38.1-105|Y
01|204374|2|2|Quoted at NET pricing|Y
01|204374|3|1|Special Overstock Promo pricing|Y
01|204374|4|1|MBT50-FMA31.75-105|Y
01|204377|1|1|*Installed with PS-17 pull stud at the factory|Y
01|204377|2|1|*Installed at factory|Y
01|204377|6|1|9TACL63D-B30N46|Y
01|204389|1|1|CAT50-SK20-300|Y
01|204401|3|1|Replacing SK20 Collets in Order# 944769.|N
01|204428|1|1|CNCZ302FA W/0 Motor or Motor Cover|Y
01|204428|1|2|SPECIAL For HORKOS NS70|Y
01|204428|1|3|Customer is responsible for all installation/service|Y
01|204428|2|1|TCD-4513-R/1 Rotary Joint - Special for above table.|Y
01|204436|2|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|204436|2|2|of final specs of machine spindle|Y
01|204439|10|1|INCLUDES EIGHT (8)HOURS OF TRAINING & INSTALLATON|Y
01|204445|14|1|Manual Option for handle|Y
01|204445|15|1|Torque wrench Option|Y
01|204457|4|1|Includes: Drive unit short bar fiber optic cable|Y
01|204457|4|2|communications cable bulkhead cables external cables|Y
01|204457|4|3|cable routing and managment hydraulic plumbing and|Y
01|204457|4|4|hose mangent ladder modifications if required|Y
01|204457|4|5|parameter setting service time and travel.|Y
01|204457|4|6|Note: The plumbing of the TAT-601 will be mounted to|Y
01|204457|4|7|side of the machine table we will provide quick|Y
01|204457|4|8|disconnects every 4-5 feet.|Y
01|204466|1|1|P/N: 63T.008.090|Y
01|204466|1|2|HSK63A 8mm turning tool|Y
01|204466|2|1|P/N: 63T.012.090|Y
01|204466|2|2|HSK63A 12mm turning tool|Y
01|204481|3|1|NBT40-SF0187-3.54CP|Y
01|204481|3|2|NBT40 DualContact Shrink Fit Holder 3/16|Y
01|204498|1|1|4 in stock ETA pending on additional pieces|Y
01|204498|2|1|19 pieces in stock eta pending on remaining pieces|Y
01|204512|1|1|For BT30-SK10-45|Y
01|204512|2|1|For all other SK10 chucks|Y
01|204532|3|1|Includes: Dual axis drive short bar fiber optic cable|Y
01|204532|3|2|communications cable bulkhead cables external cables|Y
01|204532|3|3|parameter changes service time and travel.|Y
01|204539|1|1|Discount reflects a purchase order of 1 to 2 live tools|Y
01|204539|13|1|Discount applies to quantity of 24|Y
01|204539|13|2|if quantity changes submit for re-quote|Y
01|204539|15|1|Discount applies to quantity of 24|Y
01|204539|15|2|If discount changes submit for re-quote|Y
01|204566|1|1|RGA#LVR-60010/|Y
01|204566|1|2|Repair of H63ASTR-ER25-197OTIC-65TP s/n:22906565 02|Y
01|204566|1|3|(Mimatic#201120)|Y
01|204566|2|1|Bearings seals and o-rings to be replaced.|Y
01|204583|2|1|NET pricing-non returnable/non-cancellable|Y
01|204598|11|1|Soft ware for Machine|Y
01|204598|12|1|Software for Presetter Scanner(x2)|Y
01|204598|15|1|Engineer will visit FCC to Installation and Traning.|Y
01|204603|5|1|alternative for 11/32.|Y
01|204605|2|1|(3) SK6-6 COLLETS INCLUDED AT NO COST TO DUNCHA|Y
01|204605|3|1|BACKUP SCREWS FOR BT30-SK6-60 TOOLHOLDERS|Y
01|204610|27|1|Alternative for 11/16 we do not offer in sealed|Y
01|204614|1|1|BT30-MMC8-75-AT|Y
01|204614|1|2|Only 5 pcs in stock at Nikken If these get allocated|Y
01|204614|1|3|to an order ETA is 4 months for more.|Y
01|204614|1|4|This item is considered special once ordered it cannot|Y
01|204614|1|5|be cancelled or returned.|Y
01|204614|3|1|BT30-MMC8C-135-AA   Balance of 3 pcs ETA 1-1/2 months|Y
01|204614|3|2|This item is considered special once ordered cannot be|Y
01|204614|3|3|cancelled or returned.|Y
01|204615|1|1|65mm Riser increase tilt angle to 0-141 degrees|Y
01|204615|1|2|Hydraulic Brake|Y
01|204619|1|1|C4006-0500-9.00CP|Y
01|204634|2|1|OVERSTOCK ** Closeout Promotion! All sales are FINAL!**|Y
01|204638|2|1|IF PO IS RECEIVED TODAY BY 1130AM CST THE ETA WOULD BE|Y
01|204638|2|2|MID OCTOBER.  IF THE PO IS RECEIVED AFTER 1130AM CST|Y
01|204638|2|3|TODAY THE ETA WOULD BE MID NOVEMBER|Y
01|204638|2|4|THIS IS DUE TO AIR SHIPMENT SCHEDULE AND TIMING FROM|Y
01|204638|2|5|OVERSEAS|Y
01|204641|5|1|Part# C4006-1000-6.00DIN-M|Y
01|204641|5|2|CAT40 End Mill Holder 1 DIN Modified: 2-holes|Y
01|204642|1|1|RGA#CUR-59958/|Y
01|204642|1|2|Repair of C40RAM-MI50-180-65TP  s/n: 82203 02|Y
01|204642|1|3|(Mimatic#178151)|Y
01|204642|2|1|Bearings seals o-ring and spindle threadring to be|Y
01|204642|2|2|replaced.|Y
01|204642|4|1|RGA#CUR-59958/|Y
01|204642|4|2|Repair of C40RAM-MI50-180-65TP  s/n:21903643 01|Y
01|204642|4|3|(Mimatic#178151)|Y
01|204642|5|1|Bearings seals and o-ring to be replaced.|Y
01|204659|1|1|Ramstars Drawing 61175777.000 Strt. Shank Shrink Fit|Y
01|204659|1|2|7.583~7.588 diameter X 16mm shank|Y
01|204659|1|3|Pricing based on a Purchase order of 12 holders.|Y
01|204659|1|4|Part Number TBD and quoted at NET price.|Y
01|204659|2|1|Ramstars Drawing 61175777.000 Strt. Shank Shrink Fit|Y
01|204659|2|2|7.583~7.588 diameter X 16mm shank|Y
01|204659|2|3|Pricing based on a Purchase order of 24 holders.|Y
01|204659|2|4|Part Number TBD and quoted at NET price.|Y
01|204680|1|1|w/ PS-868 installed at the factory|Y
01|204680|2|1|Installed on NC5-63-FMA31.75-90 at factory.|Y
01|204683|4|1|4pcs delivery : 9-10weeks|Y
01|204683|13|1|ER40 TAP COLLET Dia.: 19mm Square: 15mm|Y
01|204689|6|1|NON-CANCELABLE NON-RETURNABLE|Y
01|204689|6|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|204689|7|1|NON-CANCELABLE NON-RETURNABLE|Y
01|204689|7|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|204689|8|1|NON-CANCELABLE NON-RETURNABLE|Y
01|204689|8|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|204689|9|1|NON-CANCELABLE NON-RETURNABLE|Y
01|204689|9|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|204689|10|1|NON-CANCELABLE NON-RETURNABLE|Y
01|204689|10|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|204689|11|1|NON-CANCELABLE NON-RETURNABLE|Y
01|204689|11|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|204689|12|1|NON-CANCELABLE NON-RETURNABLE|Y
01|204689|12|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|204689|13|1|NON-CANCELABLE NON-RETURNABLE|Y
01|204689|13|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|204689|15|1|NON-CANCELABLE NON-RETURNABLE|Y
01|204689|15|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|204691|4|1|This is a coolant thru pull stud.  If coolant thru is|Y
01|204691|4|2|not necessary please use B30-6000-EU and save costs on|Y
01|204691|4|3|pull stud.|Y
01|204697|1|1|additional pieces 8 weeks ARO|Y
01|204721|2|1|Final sale can not be returned.|Y
01|204741|5|1|HSK63A-MMC12C-135-AT|Y
01|204741|6|1|HSK63A-MMC12C-147-AA|Y
01|204741|7|1|HSK63A-MMC8C-135-AT-RP|Y
01|204741|8|1|HSK63A-MMC8C-145-AA|Y
01|204741|9|1|HSK63A-MMC8C-175-AA|Y
01|204745|1|1|FOR .235|Y
01|204745|2|1|FOR .125 OR 1/8|Y
01|204745|3|1|FOR .118|Y
01|204745|4|1|ALSO FOR .118|Y
01|204745|5|1|FOR .072|Y
01|204745|6|1|FOR .057|Y
01|204745|7|1|FOR .052|Y
01|204763|1|1|RGA#LVR-60037/|Y
01|204763|1|2|Repair of OK101-79000 s/n:AL0009 (Alps#OK101-79000)|Y
01|204763|2|1|Bearing o-rings clutch gears spindle and spindle|Y
01|204763|2|2|covers and drive shaft to be replaced.|Y
01|204766|1|1|T/P Inspection Required|Y
01|204767|1|1|1st Batch|Y
01|204767|2|1|1st Batch|Y
01|204772|1|1|1st Batch|Y
01|204772|2|1|1st Batch|Y
01|204772|3|1|1st Batch|Y
01|204772|4|1|1st Batch|Y
01|204793|1|1|2-3 pc price --> $3320.00 less 15% --> $2822.00 net ea|Y
01|204819|1|1|Includes 8 port Rotary Joint|Y
01|204819|4|1|Travel cost can be reduced by performing Installation|Y
01|204819|4|2|of both tabes together.|Y
01|204819|5|1|Includes 8-port Rotary Joint.|Y
01|204833|1|1|LN Dual Contact std stock with pluggable coolant ports|Y
01|204833|2|1|No coolant ports. This is now considered a special with|Y
01|204833|2|2|minimum order requirements of 10 pcs. This cannot be|Y
01|204833|2|3|cancelled or returned. Quoted at NET price/each.|Y
01|204833|3|1|CAT50-SF0312-6.30CP|Y
01|204833|3|2|Unit with pluggable coolant ports. This is now|Y
01|204833|3|3|considered a special with minimum order requirements of|Y
01|204833|3|4|10pcs. This cannot be cancelled or returned. Quoted at|Y
01|204833|3|5|NET price/each|Y
01|204849|5|1|NBT40-SK6C-60P-J|Y
01|204849|5|2|NBT40 DualContact Slim Chuck SK6 Coolant High Speed 30K|Y
01|204849|5|3|G2.5 with coolant nut installed|Y
01|204849|36|1|NBT40-SK10C-60P-J|Y
01|204849|36|2|NBT40 DualContact Slim Chuck SK10 Coolant High Spd 30K|Y
01|204849|36|3|G2.5 with coolant nut installed|Y
01|204849|61|1|NBT40-SK16C-60P-J|Y
01|204849|61|2|NBT40 DualContact Slim Chuck SK16 Coolant High Spd 25K|Y
01|204849|61|3|G2.5 with coolant nut installed|Y
01|204869|1|1|T/P Inspection Required|Y
01|204869|2|1|T/P Inspection Required|Y
01|204869|3|1|T/P Inspection Required|Y
01|204872|1|1|5AX-350OSP4|Y
01|204872|1|2|SN: N/A|Y
01|204872|1|3|TAR-60031|Y
01|204875|1|1|HSK63A START.2-200 PACKAGE|Y
01|204875|2|1|Included with the ShrinkFit System|Y
01|204880|1|1|Quoted at NET pricing|Y
01|204883|1|1|TAR-60023|Y
01|204883|1|2|5AX-130FA-M SN: 3137|Y
01|204885|1|1|THE DISCOUNT GIVEN IS FOR A DEMO UNIT.  THE|Y
01|204885|1|2|WARRANTY WILL BE 1 YEAR.  THE SAME AS A NEW UNIT|Y
01|204885|1|3|ONCE THIS UNIT IS SOLD THE DISCOUNT FOR A NEW UNIT|Y
01|204885|1|4|WILL BE 30%.|Y
01|204885|7|1|EIGHT HOURS TOTAL FOR BOTH INSTALLATION & TRAINING|Y
01|204886|7|1|EIGHT HOURS TOTAL FOR BOTH INSTALLATION & TRAINING|Y
01|204898|6|1|Delivery: 6 STOCK; 2pcs 1-2wks; 10pcs 12wks; bal 16wks|Y
01|204898|8|1|Delivery: 10pcs STOCK; 1pcs 1-2wks; bal 12wks|Y
01|204900|1|1|MNL12-SK16-AD-ICE|Y
01|204900|1|2|Mori SK16 STRT Adjustable|Y
01|204900|1|3|L=144mm; 1:1 GEAR; MAX 24Nm; 6500 RPM; INT/EXT COOLANT|Y
01|204900|2|1|MNL12-SK16-AD-ICE|Y
01|204900|2|2|Pricing reflects 2 or more pieces.|Y
01|204906|1|1|New Part # CAT50-C3/4F-165U-IDU-M|Y
01|204906|1|2|CAT50 Milling Chuck 3/4 IdChipHole High Speed DIN|Y
01|204906|3|1|New Part # CAT50-C1.1/4F-165U-IDU-M|Y
01|204906|3|2|CAT50 Milling Chuck 1.1/4 IdChipHole DIN|Y
01|204906|6|1|New part# CAT50-SK16F-165U-IDU-M|Y
01|204906|6|2|CAT50 Slim Chuck SK16 IdChipHole DIN|Y
01|204916|1|1|RGA#LVR-60071/|Y
01|204916|1|2|Repair of MNL12-ER32Z-MS-10K s/n:A0051|Y
01|204916|1|3|(Alps#MSA01-3W000S)|Y
01|204916|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|204916|2|2|replaced.|Y
01|204925|1|1|Quoted at NET Pricing.  This item is non-standard stock|Y
01|204925|1|2|once a PO has been recieved it can not be canclled|Y
01|204925|1|3|or returned|Y
01|204963|2|1|Credit for trading in table Serial#3137 towards a new|Y
01|204963|2|2|replacement table.|Y
01|204973|1|1|TAR-59943|Y
01|204973|1|2|CNC202FA-M SN: 25051T|Y
01|204973|1|3|TAT-170 SN: 22150B|Y
01|204973|29|1|CORE TRADE IN - TAT-170 SENT IN NOT REPAIRABLE|Y
01|204991|3|1|This item is considered special once ordered cannot|Y
01|204991|3|2|be cancelled or returned. Net price has been quoted no|Y
01|204991|3|3|further discount should be taken.|Y
01|205012|13|1|**non-coolant|Y
01|205027|13|1|**non-coolant thru**|Y
01|205029|13|1|**non-coolant|Y
01|205034|1|1|For material and labor to machine an adapter with|Y
01|205034|1|2|M75 X 2 OD thread and M60 X 2 ID thread to thread into|Y
01|205034|1|3|customer's existing adapter.|Y
01|205035|1|1|RGA#QUA-60059/|Y
01|205035|1|2|Repair of MNL12-ER32Z s/n:A5765 (Alps#T32207)|Y
01|205035|2|1|Disassemble clean and reassemble with new grease and|Y
01|205035|2|2|use same bearings seals and o-rings.|Y
01|205039|1|1|RGA#LVR-60080/|Y
01|205039|1|2|Repair of OKL3-ER32X s/n:AL1224 (Alps#OK101-14000)|Y
01|205039|2|1|Bearings o-rings collet nut clutch and spindle to be|Y
01|205039|2|2|replaced.|Y
01|205042|9|1|Offered as an alternative for line 11|Y
01|205042|10|1|Offered as an alternative for line 12|Y
01|205042|11|1|1-9 pc price is $833 net each|Y
01|205042|11|2|10-19 pc price is $745 net each|Y
01|205042|11|3|This special cannot be cancelled or returned.|Y
01|205042|12|1|1-9 pc price is $855 net each|Y
01|205042|12|2|10-19 pc price is $763 net each|Y
01|205042|12|3|This special cannot be cancelled or returned.|Y
01|205051|2|1|CAT50-C1.1/4-90UG-IDU|Y
01|205055|2|1|Lyndex-Nikken to make position block upon receipt|Y
01|205055|2|2|of spindle drawing confirmation.|Y
01|205055|2|3|NET price|Y
01|205064|2|1|Lyndex-Nikken to make position block upon receipt|Y
01|205064|2|2|of spindle drawing confirmation.|Y
01|205064|2|3|NET price|Y
01|205086|3|1|All smooth collets in the QCFC80 should be same price|Y
01|205086|3|2|if it's a standard size|Y
01|205093|3|1|Non-returnable/non-cancellable|Y
01|205093|4|1|Non-returnable/non-cancellable|Y
01|205098|3|1|5.5 Riser or similar|Y
01|205098|3|2|will need to know table layout and fixture layout|Y
01|205098|3|3|prior to design of subplate|Y
01|205101|1|1|BMT65-ER25-AD-ICE|Y
01|205101|1|2|BMT65 ER25 Adjustable Live ICE|Y
01|205101|1|3|Price would be the same for 1-3 Pcs.|Y
01|205101|1|4|ETA for 3rd piece is 7-8 Weeks|Y
01|205114|1|1|NCAT50-C1.1/4-90UG-IDU|Y
01|205115|1|1|OVERSTOCK PROMO - Not returnable|Y
01|205115|2|1|OVERSTOCK PROMO - Not returnable|Y
01|205120|13|1|*Please note minimum price pending on where Quill needs|Y
01|205120|13|2|to be when machining with Right Angle Head.|Y
01|205146|6|1|NON-CANCELABLE NON-RETURNABLE|Y
01|205146|6|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205146|7|1|NON-CANCELABLE NON-RETURNABLE|Y
01|205146|7|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205146|8|1|NON-CANCELABLE NON-RETURNABLE|Y
01|205146|8|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205146|9|1|NON-CANCELABLE NON-RETURNABLE|Y
01|205146|9|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205146|10|1|NON-CANCELABLE NON-RETURNABLE|Y
01|205146|10|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205146|11|1|NON-CANCELABLE NON-RETURNABLE|Y
01|205146|11|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205146|12|1|NON-CANCELABLE NON-RETURNABLE|Y
01|205146|12|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205146|13|1|NON-CANCELABLE NON-RETURNABLE|Y
01|205146|13|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205146|15|1|NON-CANCELABLE NON-RETURNABLE|Y
01|205146|15|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205155|1|1|RGA#CUR-60076/|Y
01|205155|1|2|Repair of C50-MRAM-IC s/n:19904992 01 (Mimatic#162814)|Y
01|205155|2|1|Bearings seals and o-rings to be replaced.|Y
01|205177|1|1|Drive adapter Okuma IK LB300|Y
01|205177|1|2|04.8140.6840.001 [ MIMATIC-EL TOOL]|Y
01|205177|1|3|MIM#123363 DWG#21830|Y
01|205177|1|4|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205177|1|5|NON-CANCELABLE NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|205177|2|1|Drive adapter Okuma IK LB300|Y
01|205177|2|2|04.8140.6840.001 [ MIMATIC-EL TOOL]|Y
01|205177|2|3|MIM#123363 DWG#21830|Y
01|205177|2|4|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|205177|2|5|NON-CANCELABLE NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|205183|1|1|5AX-2002 SN: NA|Y
01|205183|1|2|TAR-60064|Y
01|205189|2|1|For Eric|Y
01|205201|6|1|NC5006-1250-2.00 (New Part Number)|Y
01|205201|6|2|NCAT50 DualContact End Mill Holder 1.1/4 Chip Hole|Y
01|205201|6|3|Please Note: I have (1) NC50S6-1250-2.00in stock same|Y
01|205201|6|4|price.|Y
01|205201|11|1|NC5006-1250-2.00CP|Y
01|205201|11|2|NCAT50 DualContact End Mill Holder 1.1/4 IdChipHole|Y
01|205207|11|1|RN-CN321SD-8+1-B|Y
01|205207|11|2|8+1 Rotary Joint / Union CNC321|Y
01|205211|1|1|SPKR|Y
01|205211|2|1|VPA.0620.DC|Y
01|205211|3|1|PPPC-12|Y
01|205211|4|1|BPP.0512.KB  (VPP-0512-KG)|Y
01|205211|5|1|KLJ.I30|Y
01|205211|6|1|OR.VPA.DC|Y
01|205214|4|1|All sales are final|Y
01|205214|4|2|Discount applies to MZQT47-ER25-AD|Y
01|205226|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|205226|2|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|205226|3|1|Req.INS/Install E25-NUT&ER25-SCREW(C)|Y
01|205226|4|1|Req.INS/Install E16-NUT&ER16-SCREW(C)|Y
01|205226|5|1|Req.INS/Install E16-NUT&ER16-SCREW(C)|Y
01|205226|6|1|1st Batch/961046 10/3:DWG RECVD|Y
01|205226|7|1|1st Batch/Install E32-NUT & ER32-SCREW(C)|Y
01|205229|4|1|External Cable Set - 2 cables total|Y
01|205229|4|2|1 - Encoder Cable & 1 - Power and Signal Cable|Y
01|205229|4|3|***This optional line item is only needed if the|Y
01|205229|4|4|full installation package is not ordered.***|Y
01|205229|7|1|***Please note: External Cables are included in this|Y
01|205229|7|2|cost.  So if this line item is ordered please omit|Y
01|205229|7|3|any orders for (Line Item #4) as those same cables are|Y
01|205229|7|4|also included in this package price.***|Y
01|205245|1|1|Delivery: 1 stock at L-N / 8 stock at Mimatic 2~3 weeks|Y
01|205245|1|2|Balance due mid to end Nov.|Y
01|205245|2|1|6 stock at L-N / 1 stock at Mimatic 2~3 Weeks|Y
01|205245|2|2|Balance 12~13 weeks upon receipt of order.|Y
01|205247|1|1|MURATA MD100/200|Y
01|205247|1|2|BMT55 29mmDL 76X110mm Z-Axis SK16 C/H 125mm|Y
01|205250|1|1|Delivery 6 stock at L/N / 5-pcs 2~3 Weeks|Y
01|205250|1|2|Balance 11~12 Weeks|Y
01|205250|2|1|19 Stock at L-N / 3-pcs 2~3 weeks / Bal pending|Y
01|205253|1|1|Cooling Unit included.|Y
01|205253|3|1|Spec: 1/83/161/45/163/81/25/83/41|Y
01|205253|3|2|345681012162025mm|Y
01|205264|5|1|NBT40-SK6C-60P-J|Y
01|205264|5|2|NBT40 DualContact Slim Chuck SK6 Coolant High Speed 30K|Y
01|205264|5|3|G2.5 with coolant nut installed|Y
01|205264|36|1|NBT40-SK10C-60P-J|Y
01|205264|36|2|NBT40 DualContact Slim Chuck SK10 Coolant High Spd 30K|Y
01|205264|36|3|G2.5 with coolant nut installed|Y
01|205264|61|1|NBT40-SK16C-60P-J|Y
01|205264|61|2|NBT40 DualContact Slim Chuck SK16 Coolant High Spd 25K|Y
01|205264|61|3|G2.5 with coolant nut installed|Y
01|205267|1|1|Final sale|Y
01|205271|5|1|These are included in the price of which ever unit|Y
01|205271|5|2|you choose.|Y
01|205272|1|1|RGA#LVR-59999/|Y
01|205272|1|2|Repair of MNL12-ER32Z-ICE-10K s/n:21902354 02|Y
01|205272|1|3|(Mimatic#101523)|Y
01|205272|2|1|Bearings seals and o-rings to be replaced.|Y
01|205273|1|1|2-Hole DIN modification|Y
01|205273|2|1|4-Hole DIN modification|Y
01|205276|5|1|These are included in the price of which ever unit|Y
01|205276|5|2|you choose.|Y
01|205277|2|1|Delivery is after design is confirmed.|Y
01|205280|1|1|Std Stock|Y
01|205280|3|1|*Nikken - non-standard for LN and considered a special|Y
01|205280|3|2|Once a PO has been issued these cannot be cancelled or|Y
01|205280|3|3|returned.   Per Drawing|Y
01|205280|3|4|NET PRICE|Y
01|205317|42|1|NC4007-0020-6.00BN|Y
01|205317|42|2|NCAT40-Dual Contact ER20 Collet Chuck Hi Torque|Y
01|205317|42|3|Bearing Nut Installed.|Y
01|205317|43|1|NC4007-0040-3.13BN|Y
01|205317|43|2|NCAT40-Dual Contact ER40 Collet Chuck Hi Torque|Y
01|205317|43|3|Bearing Nut Installed.|Y
01|205365|1|1|Match to Maritool BT30 TPC.3-3.0|Y
01|205365|1|2|SPECIAL ORDER - NON-CANCELABLE/NON-RETURNABLE|Y
01|205365|1|3|DRAWING APPROVAL REQUIRED|Y
01|205365|1|4|NET PRICING QUOTED NO FURTHER DISCOUNTS|Y
01|205365|2|1|Match to Maritool BT30 TPC.3-3.0|Y
01|205365|2|2|SPECIAL ORDER - NON-CANCELABLE/NON-RETURNABLE|Y
01|205365|2|3|DRAWING APPROVAL REQUIRED|Y
01|205365|2|4|NET PRICING QUOTED NO FURTHER DISCOUNTS|Y
01|205365|3|1|Match to Maritool BT30 TPC.3-3.0|Y
01|205365|3|2|SPECIAL ORDER - NON-CANCELABLE/NON-RETURNABLE|Y
01|205365|3|3|DRAWING APPROVAL REQUIRED|Y
01|205365|3|4|NET PRICING QUOTED NO FURTHER DISCOUNTS|Y
01|205365|4|1|Match to Maritool BT30 TPC.3-3.0|Y
01|205365|4|2|SPECIAL ORDER - NON-CANCELABLE/NON-RETURNABLE|Y
01|205365|4|3|DRAWING APPROVAL REQUIRED|Y
01|205365|4|4|NET PRICING QUOTED NO FURTHER DISCOUNTS|Y
01|205384|6|1|PRESETTER ONLY INSTALLATION & TRAINING|Y
01|205384|13|1|TID INSTALLATION ON PRESETTER & MACHINE #1|Y
01|205384|19|1|INSTALLATION & TRAINING PER MACHINE #s 2-6|Y
01|205385|1|1|Min. Order Qty.: 1-4pcs|Y
01|205385|2|1|Min. Order Qty.: 5pcs|Y
01|205385|2|2|NOTE: Special Discount Included.|Y
01|205385|2|3|QTY Break Special Pricing|Y
01|205385|9|1|BT40-CZF25-120|Y
01|205385|9|2|BT40 Bulls Eye Zero Fit Milling Chuck C25|Y
01|205386|3|1|Additional discount applies to NC40S6-0500-1.75|Y
01|205386|3|2|All sales are final - Overstock|Y
01|205386|8|1|NOTE: Gage Length: 90mm|Y
01|205386|22|1|CAT40-SK13-65U-IDU|Y
01|205386|22|2|CAT40 Slim Chuck SK13 IdChipHole 20Krpm G2.5|Y
01|205386|22|3|MOQ: 1-9|Y
01|205388|3|1|SK20-1/83/161/45/163/87/161/29/165/83/4 In|Y
01|205394|9|1|Quoted at NET price.|Y
01|205403|4|1|This replacement is much shorter than the discontinued|Y
01|205403|4|2|W1005-0562-6.41 (which had a 4.13 gage length)|Y
01|205403|5|1|This replacement is much shorter than the discontinued|Y
01|205403|5|2|W1005-0875-7.83 (which had a 5.38 gage length)|Y
01|205403|6|1|This item has a 6.57 GL vs the 7.81 on the discontinued|Y
01|205403|6|2|W1505-1375-10.5. Item quoted is the only available|Y
01|205403|6|3|substitute and is the coolant option.|Y
01|205409|4|1|quoted as an in stock alternative.|Y
01|205421|3|1|$5000.00 Free tooling certifcate promo.|Y
01|205452|1|1|Hydraulic Braking|Y
01|205452|2|1|500 PSI Hydraulic Tank and Pump for Table Brake System|Y
01|205452|3|1|Installation Includes: Travel Labor Installation|Y
01|205452|3|2|components and/or wiring for 5AX rotary table and|Y
01|205452|3|3|hydraulic unit. We will install rotary table and hyd|Y
01|205452|3|4|unit set parameters and zeros. Machine will be ready|Y
01|205452|3|5|for production set up when we are finished.|Y
01|205452|4|1|NET Pass through charge for custom made adapter plate|Y
01|205452|4|2|for mounting Nikken 5AX-201 to Haas VF3SS machine bed.|Y
01|205452|4|3|Plate will be .750-1.0 thick and provide clearance hole|Y
01|205452|4|4|locations for mounting to machine as well as tapped|Y
01|205452|4|5|holes for rotary table toe clamping. Will also have a|Y
01|205452|4|6|slip fit keyway slot to accept the rotary table keys|Y
01|205452|4|7|that provide alignment to the machine.|Y
01|205456|1|1|Includes motor and cable set.|Y
01|205458|6|1|This is considered special. Once ordered cannot be|Y
01|205458|6|2|cancelled or returned.|Y
01|205464|23|1|SKJ25-1/8C|Y
01|205464|23|2|SK20/SK25 Coolant Cap 1/8|Y
01|205480|1|1|SKG-12HAS-J|Y
01|205480|1|2|Special coolant thru back up screwwith key way (notch)|Y
01|205480|1|3|customized from SKG-12HAS|Y
01|205482|2|1|These pots are included in the price of the Start 2|Y
01|205490|1|1|Balance Pending|Y
01|205490|2|1|Delivery: We currently have 4 tools in stock.|Y
01|205490|2|2|5-pcs 7~8 Weeks / Balance 13~14 Weeks|Y
01|205495|1|1|20% OVERSTOCK Promotion applied|Y
01|205495|1|2|This item cannot be returned.|Y
01|205508|1|1|INSPECTION OF ROTARY TABLES ON YEARLY BASIS|Y
01|205508|1|2|ESTIMATE OF QUOTE IS FOR 4 HOURS OF LABOR TO CHECK|Y
01|205513|8|1|Includes: Travel/Labor Time Food/Hotel/Gas and Other|Y
01|205513|8|2|Expenses.(Travel 2days 1day Labor)|Y
01|205515|1|1|Please Note: Overstock discount of 20% has been added|Y
01|205515|1|2|to the discount of this tool only. Overstock items|Y
01|205515|1|3|are non-returnable.|Y
01|205519|1|1|RGA#LVR-60088/|Y
01|205519|1|2|Repair of HA40-ER32X s/n:AL0002 (Alps#HAA00-11000)|Y
01|205519|2|1|Bearings o-rings collet nut drive shaft and spindle|Y
01|205519|2|2|to be replaced.|Y
01|205524|1|1|20% Overstock Promotion applied|Y
01|205524|1|2|This item cannot be returned|Y
01|205525|1|1|Lyndex Part # TBD|Y
01|205525|1|2|V-Type Mazak QTN250 tool with 1:4 gear ratio & ER16spdl|Y
01|205525|1|3|2 pc = $9210.90 Net Each|Y
01|205525|1|4|3 pc = $8563.94 Net Each|Y
01|205529|1|1|RGA#CUR-60067/|Y
01|205529|1|2|Repair of WK-ZWS3-BT50-NUC12-O s/n:20739 01|Y
01|205529|1|3|(Mimatic#172069)|Y
01|205529|2|1|Bearings seals o-rings and KM7 to be replaced.|Y
01|205529|4|1|RGA#CUR-60067/|Y
01|205529|4|2|Repair of WK-ZWS3-BT50-NUC12-O s/n:64036 01|Y
01|205529|4|3|(Mimatic#172069)|Y
01|205529|5|1|Bearings seals and o-rings to be replaced.|Y
01|205529|7|1|RGA#CUR-60067/|Y
01|205529|7|2|Repair of WK-ZWS3-BT50-NUC12-O s/n:64036 02|Y
01|205529|8|1|Bearings seals o-rings and damaged gears to be|Y
01|205529|8|2|replaced.|Y
01|205561|3|1|OVERSTOCK- All sales are final.|Y
01|205561|3|2|Additional discount of 20% has been applied for this|Y
01|205561|3|3|item only.|Y
01|205567|1|1|This item is considered special once ordered it cannot|Y
01|205567|1|2|be cancelled or returned.|Y
01|205571|1|1|*NET PRICE|Y
01|205579|1|1|1:1 Gear 8500RPM|Y
01|205579|1|2|Standard stock|Y
01|205579|1|3|*Qty Break Pricing:|Y
01|205579|1|4|1-2pcs List $3631.00/ less 25%|Y
01|205579|1|5|3-4pcs List $3631.00/ less 30%|Y
01|205580|1|1|TAR-60084|Y
01|205580|1|2|5AX-130FA-M SN: N/A|Y
01|205580|1|3|TABLE NEEDS REBUILD - BEARINGS/SEALS/O-RINGS|Y
01|205580|1|4|TABLE HAD MACHINE TOOL CRASH AT SOME POINT BUT TABLE|Y
01|205580|1|5|CAN STILL BE REPAIRED|Y
01|205580|1|6|WORM WHEEL AND WORM SCREWS LOOK AND FEEL GOOD ->|Y
01|205580|1|7|WILL TRY TO RE-USE|Y
01|205589|1|1|Lyndex Nikken Part# TBD|Y
01|205589|1|2|MOQ for this price is 6 pcs|Y
01|205589|1|3|MAZAK LIVE; 90DEG HEAD; HSK50 (x2); MAIN SUB 35mm BACK|Y
01|205589|1|4|OFFSET|Y
01|205589|1|5|L1=130mm; 1:1 GEAR ; MAX 6500 RPM; 70BAR INT/EXT/ICE|Y
01|205589|1|6|REF DRWG # 00030824 in HSK50 output.|Y
01|205589|3|1|HSK50A ER32|Y
01|205589|3|2|40 pc = same each net price as 20|Y
01|205597|3|1|Includes: Drive unit short bar fiber optic cables|Y
01|205597|3|2|communications cables bulkhead cables external cables|Y
01|205597|7|1|Includes: Drive unit short bar fiber optic cable|Y
01|205597|7|2|communications cable bulkhead cables external cables|Y
01|205597|7|3|parameter changes service time and travel.|Y
01|205597|7|4|Installation to take aprox 1-2 days|Y
01|205599|3|1|Includes activation switch.|Y
01|205599|4|1|Includes activation switch|Y
01|205603|1|1|Includes cables|Y
01|205603|2|1|Includes cables|Y
01|205603|4|1|$2500.00 Free Tooling Promotion|Y
01|205605|2|1|P/N: TBD|Y
01|205605|2|2|Drive Shaft SK50 accoring to ISO7388-1 -->|Y
01|205605|2|3|(forner DIN 69871) complete with standard torque|Y
01|205605|2|4|support according to ISO 9524 and locking device|Y
01|205605|2|5|(without machine-side stop block)> to be adapted to the|Y
01|205605|2|6|BAZ by the customer  For a stable and rigid mounting of|Y
01|205605|2|7|the angle head to the machine we strongly recommend a|Y
01|205605|2|8|3-point support adapted to the machine. Otherwise no|Y
01|205605|2|9|guarantee can be given for any stability problems.|Y
01|205605|2|10|A=80mm / d=18mm|Y
01|205605|3|1|Tool Holder Capto C5; Coolant supply through spindle|Y
01|205605|3|2|and via injection tube; Filter fineness: max. 0.05mm|Y
01|205605|3|3|constant dry run possible with sufficient cooling phase|Y
01|205605|3|4|max. mold temperature 90C; no reversal of direction of|Y
01|205605|3|5|rotation (drive direction equal to output direction)|Y
01|205605|3|6|L1= 109mm; Gear ratio:i(n1/n2)=2.5:1; max. coolant|Y
01|205605|3|7|pressure: p(max)= 70bar; max. torque M(max)= 200Nm|Y
01|205605|3|8|max. input speed: nl(max)= 5000RPM|Y
01|205606|5|1|50 TAPER TO VDI25 ADAPTER|Y
01|205606|8|1|INCLUDES 8 HOURS TOTAL FOR INSTALLATION & TRAINING|Y
01|205609|12|1|Please Note: Special promotion discount has been|Y
01|205609|12|2|applied to this quote. If quantities should change|Y
01|205609|12|3|please re-submit your quotation.|Y
01|205618|2|1|Dual-Contact may work in standard CAT50 spindle|Y
01|205618|3|1|20% Discount only applies to NCAT50-SF0750-3.15.|Y
01|205618|3|2|Item cannot be returned.|Y
01|205631|11|1|Quoted at NET price.|Y
01|205632|1|1|Non-Anniversary Style|Y
01|205646|1|1|Promotion discount-item is non-returnable.|Y
01|205650|1|1|SPECIAL NON-CANCELABLE/NON-RETURNABLE AFTER RECEIPT|Y
01|205650|1|2|OF PO|Y
01|205650|1|3|NET PRICING QUOTED NO FURTHER DISCOUNTS|Y
01|205656|7|1|Misc Hydraulic fittings and hoses|Y
01|205671|3|1|this is for HSK125A-C1EX-121S OS promo|Y
01|205681|8|1|Or NST300AR21-750W|Y
01|205681|9|1|NST500AR21-1300W|Y
01|205689|6|1|SPECIAL - NON-CANCELABLE NON-RETURNABLE after PO is|Y
01|205689|6|2|Received|Y
01|205690|5|1|Quoted at NET price.|Y
01|205690|6|1|Quoted at NET price.|Y
01|205702|2|1|New part# for S75SF-0250-6.00|Y
01|205702|3|1|New part# for S62SF-0250-4.00|Y
01|205706|7|1|TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|205706|7|2|LIMITED TO A MAXIMUM OF 4 PEOPLE.|Y
01|205707|7|1|TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|205707|7|2|LIMITED TO A MAXIMUM OF 4 PEOPLE.|Y
01|205712|1|1|Non_ANSI|Y
01|205712|1|2|Special pricing for 1pc left over in stock.|Y
01|205712|1|3|All sales are final - OVERSTOCK|Y
01|205712|1|4|**If additional pieces required we must requote as|Y
01|205712|1|5|new part# CAT50-SK16-55U-IDU at new price|Y
01|205712|6|1|CAT50-SK16-55U-IDU|Y
01|205712|6|2|CAT50 Slim Chuck SK16 IdChipHole Non_ANSI 15Krpm G2.5|Y
01|205712|6|3|**SPECIAL: Cannot be cancelled or returned|Y
01|205712|6|4|Qty Break:|Y
01|205712|6|5|1-9pcs $666.00ea/NET|Y
01|205712|6|6|10+pcs $650.00ea/NET|Y
01|205712|7|1|**SPECIAL: Cannot be cancelled or returned|Y
01|205712|7|2|Qty Break:|Y
01|205712|7|3|1-9pcs $702.00ea/NET|Y
01|205712|7|4|10+pcs $686.00ea/NET|Y
01|205730|1|1|This item is special - Once ordered it cannot be|Y
01|205730|1|2|cancelled or returned.|Y
01|205730|1|3|Net price has been quoted no further discount should|Y
01|205730|1|4|be taken.|Y
01|205733|1|1|CNC401FA-M SN: N/A|Y
01|205733|1|2|TAR-60081|Y
01|205733|1|3|WORM WHEEL AND WORM SCREEN ARE IN GOOD CONDITION|Y
01|205733|1|4|BEARINGS/SEALS NEED TO BE REPLACED|Y
01|205744|1|1|Price is good for 60-100 pcs|Y
01|205760|1|1|T00433 - OD Cutting holder|Y
01|205764|1|1|/TQW-PS#30/ER08HEX|Y
01|205770|1|1|1:1 Gear 8500RPM|Y
01|205770|1|2|Standard stock|Y
01|205770|1|3|*Qty Break Pricing:|Y
01|205770|1|4|1-2pcs List $3631.00/ less 25%|Y
01|205770|1|5|3-4pcs List $3631.00/ less 30%|Y
01|205777|4|1|**NON-Coolant|Y
01|205794|1|1|Lyndex Nikken Part# TBD|Y
01|205794|1|2|MOQ for this price is 6 pcs|Y
01|205794|1|3|MAZAK LIVE; 90DEG HEAD; HSK50 (x2); MAIN SUB 35mm BACK|Y
01|205794|1|4|OFFSET|Y
01|205794|1|5|L1=130mm; 1:1 GEAR ; MAX 6500 RPM; 70BAR INT/EXT/ICE|Y
01|205794|1|6|REF DRWG # 00030824 in HSK50 output.|Y
01|205794|3|1|HSK50A SK20|Y
01|205794|3|2|40 pc = $525/each = $21000 NET|Y
01|205805|1|1|No INS Req'd/Cheerson BOAT #10182301|N
01|205805|2|1|No INS Req'd/Cheerson BOAT #10182301|N
01|205805|3|1|No INS Req'd/Cheerson BOAT #10182301|N
01|205805|4|1|No INS Req'd/Cheerson BOAT #10182301|N
01|205805|5|1|No INS Req'd/Cheerson BOAT #10182301|N
01|205805|6|1|No INS Req'd/Cheerson BOAT #10182301|N
01|205809|4|1|8 in stock in US 2-3 wks for remaing pieces from JPN|Y
01|205816|1|1|RGA#CUR-60114/|Y
01|205816|1|2|Repair of C40RA-0025M s/n:49928 09 (Mimatic#175241)|Y
01|205816|2|1|Bearings seals o-rings and damaged gears to be|Y
01|205816|2|2|replaced.|Y
01|205823|1|1|Calibration service for Hathor Six  s/n:unknown|Y
01|205823|1|2|This is a time based estimate. Any expenses and parts|Y
01|205823|1|3|used would be added to the cost after the service is|Y
01|205823|1|4|complete.|Y
01|205828|7|1|We have only one left then this size is discontinued.|Y
01|205828|7|2|This one cannot be returned|Y
01|205840|30|1|QCFC80-016-SMO 1/4 Smooth Collet Set|Y
01|205840|33|1|QCFC80-036-SMO 9/16 Smooth Round Collet Set|Y
01|205840|34|1|QCFC80-036-HEX 9/16 Hex Collet Set|Y
01|205840|36|1|QCFC80-040-HEX 5/8 Hex Collet Set|Y
01|205840|37|1|QCFC80-044-SMO 11/16 Smooth Round Collet Set|Y
01|205840|41|1|QCFC80-040-HEX      5/8 Hex Collet Set|Y
01|205840|42|1|QCFC80-044-SMO      11/16 Smooth Round Collet Set|Y
01|205840|43|1|QCFC80-052-SMO      13/16 Smooth Round Collet Set|Y
01|205840|44|1|QCFC80-054-SMO      27/32 Smooth Round Collet Set|Y
01|205840|46|1|QCFC80-068-SMO 1-1/16 Smooth Collet Set|Y
01|205840|47|1|QCFC80-060-SMO      15/16 Smooth Round Collet Set|Y
01|205840|48|1|QCFC80-060-SER      15/16 Serrated Round Collet Set|Y
01|205840|49|1|QCFC80-060-HEX      15/16 Hex Collet Set|Y
01|205840|51|1|QCFC80-068-SMO      1-1/16 Smooth Collet Set|Y
01|205840|54|1|QCFC80-106-SMO      1-21/32 Smooth Round Collet Set|Y
01|205840|56|1|QCFC80-084-SMO      1-5/16 Smooth Round Collet Set|Y
01|205840|57|1|QCFC80-116-SMO 1-13/16 Smooth Round Collet Set|Y
01|205842|6|1|Delivery: 2 STOCK; 2pcs 1-2wks; 10pcs 12wks; bal 16wks|Y
01|205842|8|1|Delivery: 10pcs STOCK; 1pcs 1-2wks; bal 12wks|Y
01|205845|3|1|CAT40-ER16-4.00BN|Y
01|205845|3|2|This is a non-standard stock item. One a PO has been|Y
01|205845|3|3|issued it cannot be cancelled or returned.|Y
01|205848|1|1|Old Style MZQT5-CT40X-OFF with Pull stud hold rather|Y
01|205848|1|2|thank NUT hold.|Y
01|205852|1|1|1st Batch 7/24KC:DWG Saved in Teams File.|Y
01|205853|1|1|1st Batch 6/22:DWG Saved in Teams File|Y
01|205863|8|1|Replaces part# 6005|Y
01|205863|9|1|Replaces part# 51105|Y
01|205874|1|1|Quoted at NET pricing|Y
01|205890|1|1|***BUDGETARY QUOTE*** GENERAL DESCRIPTION***|Y
01|205890|1|2|CAT50 Input with machine specific adaption.|Y
01|205890|1|3|Offset version with 1:2 GR and either MI output spindle|Y
01|205890|1|4|(need to special MI Adaptor for Grinding wheel as well)|Y
01|205890|1|5|OR dedicated arbor mount for the 8/203.2mm Grinding|Y
01|205890|1|6|Wheel|Y
01|205890|1|7|CURVIC coupling must be supplied by the customer|Y
01|205893|1|1|PSB-0-CH|Y
01|205893|2|1|H-DR-160|Y
01|205896|1|1|QCFC80-060-SMO   QCFC80  O15/16      smooth round|Y
01|205896|2|1|QCFC80  1-21/32|Y
01|205896|3|1|QCFC80  1-13/16|Y
01|205896|4|1|QCFC80  15/16|Y
01|205896|5|1|QCFC80   9/16|Y
01|205896|6|1|QCFC80   5/8|Y
01|205896|7|1|QCFC80  15/16|Y
01|205904|5|1|Please Note the extra %5 has been added to the discount|Y
01|205904|5|2|quoted.|Y
01|205910|5|1|ALTERNATIVE TO H40E-SF0375-3.15|Y
01|205920|3|1|All sales are final on this line.|Y
01|205970|8|1|TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING.|Y
01|205974|7|1|TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|205981|34|1|Tool Assmbly fee per tool at NET price each.|Y
01|205988|2|1|Year End Rotary Table Promo|Y
01|205988|3|1|Year End Rotary Table Promo|Y
01|205988|4|1|Installation includes: Drive unit short bar fiber|Y
01|205988|4|2|optic cables communication cable bulkhead cables|Y
01|205988|4|3|external cables service time and travel.|Y
01|205989|1|1|CAT50-SK16-55U-IDU|Y
01|205997|2|1|Please note: This collet is non standard stock. Once|Y
01|205997|2|2|a purchase order is placed it cannot be cancelled|Y
01|205997|2|3|or returned.|Y
01|206002|1|1|RGA#LVR-60127/|Y
01|206002|1|2|Repair of MZQT47-ER32Z-MS s/n:20903359 02|Y
01|206002|1|3|(Mimatic#124638)|Y
01|206002|2|1|Bearings seals o-rings input shaft and spindle nut|Y
01|206002|2|2|to be replaced.|Y
01|206007|1|1|HSK125A-SK20C-120 HSK125A slim chuck SK20|Y
01|206007|1|2|ETA is 20-22 WEEKS ARO Drawing approval may be needed|Y
01|206007|1|3|These are considered specials Once a PO is received|Y
01|206007|1|4|they are NON-Cancelable & NON-Returnable|Y
01|206007|1|5|Pricing for 1-9 pieces|Y
01|206007|1|6|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|206007|2|1|HSK125A-SK20C-120 HSK125A slim chuck SK20|Y
01|206007|2|2|ETA is 20-22 WEEKS ARO Drawing approval may be needed|Y
01|206007|2|3|These are considered specials Once a PO is received|Y
01|206007|2|4|they are NON-Cancelable & NON-Returnable|Y
01|206007|2|5|Pricing for 10+ pcs|Y
01|206007|2|6|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|206007|3|1|HSK125A-SK25C-145 HSK125A slim chuck SK25|Y
01|206007|3|2|ETA is 20-22 WEEKS ARO Drawing approval may be needed|Y
01|206007|3|3|These are considered specials Once a PO is received|Y
01|206007|3|4|they are NON-Cancelable & NON-Returnable|Y
01|206007|3|5|Pricing for 1-9 pcs|Y
01|206007|3|6|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|206007|4|1|HSK125A-SK25C-145 HSK125A slim chuck SK25|Y
01|206007|4|2|ETA is 20-22 WEEKS ARO Drawing approval may be needed|Y
01|206007|4|3|These are considered specials Once a PO is received|Y
01|206007|4|4|they are NON-Cancelable & NON-Returnable|Y
01|206007|4|5|Pricing for 10+ pcs|Y
01|206007|4|6|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|206024|6|1|PRESETTER ONLY INSTALLATION & TRAINING|Y
01|206024|13|1|TID INSTALLATION ON PRESETTER & MACHINE #1|Y
01|206024|19|1|INSTALLATION & TRAINING PER MACHINE #s 2-6|Y
01|206033|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|206035|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|206037|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|206044|4|1|AC4-XXAA133-4D000  C4 Straight Shank Sleeve Draw|Y
01|206044|4|2|Quoted at NET price.|Y
01|206044|5|1|AC4-XXAA133-4R000  C4 Straight Shank Sleeve Cam|Y
01|206044|5|2|Quoted at NET price.|Y
01|206052|1|1|Ramstar Part #SF5.9-C16-121|Y
01|206052|1|2|Quoted at NET price.|Y
01|206052|2|1|Ramstar Part #SF5.9-C16-121|Y
01|206052|2|2|Quoted at NET price.|Y
01|206058|3|1|RGA#TOR-60133/|Y
01|206058|3|2|Repair of CAT50-UMT200U|Y
01|206058|5|1|Calibration service included.|Y
01|206058|7|1|RGA#TOR-60133/|Y
01|206058|7|2|Repair of CAT50-UMT200|Y
01|206058|10|1|Calibration service included.|Y
01|206071|2|1|9CSU-P151B|Y
01|206071|2|2|These are non-standard stock items and considered|Y
01|206071|2|3|specials.  Once a PO has been issued these items|Y
01|206071|2|4|cannot be cancelled or returned.|Y
01|206086|32|1|This size is a non-standard stock item and considered|Y
01|206086|32|2|special it cannot be cancelled or returned.|Y
01|206086|33|1|This size is a non-standard stock item and considered|Y
01|206086|33|2|special it cannot be cancelled or returned.|Y
01|206086|37|1|This size is a non-standard stock item and considered|Y
01|206086|37|2|special it cannot be cancelled or returned.|Y
01|206086|38|1|This size is a non-standard stock item and considered|Y
01|206086|38|2|special it cannot be cancelled or returned.|Y
01|206086|39|1|This size is a non-standard stock item and considered|Y
01|206086|39|2|special it cannot be cancelled or returned.|Y
01|206086|41|1|This size is a non-standard stock item and considered|Y
01|206086|41|2|special it cannot be cancelled or returned.|Y
01|206107|1|1|This is a non-standard stock item. Once a PO has been|Y
01|206107|1|2|issued it cannot be cancelled or returned.|Y
01|206113|1|1|RGA#LVR-60135/|Y
01|206113|1|2|Repair of OK101-79000 s/n:AL004 (Alps#OK101-79000)|Y
01|206113|2|1|Bearings o-rings clutch nuts drive shaft and|Y
01|206113|2|2|spindle to be replaced.|Y
01|206143|1|1|RGA#TOR-60107/|Y
01|206143|1|2|Repair of W15S5-1375-6.55|Y
01|206146|1|1|Install CAT40-NMTB-ADPT to convert to NMTB40|Y
01|206148|1|1|CCK3/4-11 Straight Coolant Collet/Sleeve OD 3/4|Y
01|206148|1|2|ID 11mm|Y
01|206148|2|1|CKFN20(3/4)-11C|Y
01|206148|2|2|CCK Coolant Seal Nut/Cap OD20mm(3/4)  ID 11mm|Y
01|206156|8|1|C4 Capto Boring Bar Holder L-N part # TBD|Y
01|206156|8|2|Drawing C4.DUR.OK60A >> (Remove this Drawing number|Y
01|206156|8|3|before sending quote.)|Y
01|206156|8|4|If order is placed by end of next week Nov 3rd we can|Y
01|206156|8|5|ship to end user 1st week of Dec. If placed later|Y
01|206156|8|6|delivery is end of Jan if still available at vendor.|Y
01|206156|9|1|C4 Capto Boring Bar Holder L-N part # TBD|Y
01|206156|9|2|Drawing # C4.DUR.OK60A.SS (Remove this drawing number|Y
01|206156|9|3|before sending quote.)|Y
01|206156|9|4|If order is placed by end of next week Nov 3rd we can|Y
01|206156|9|5|ship to end user 1st week of Dec. If placed later|Y
01|206156|9|6|delivery is end of Jan if still available at vendor.|Y
01|206162|2|1|***for 3J HEX***|Y
01|206164|1|1|RGA#TOR-60157/|Y
01|206164|1|2|Repair of CAT50U-NX5-151 s/n:KJ-100|Y
01|206172|1|1|1st Batch 5/23:DWG Approved/BT|Y
01|206172|2|1|1st Batch 5/23:DWG Approved/BT|Y
01|206172|3|1|1st Batch 5/23:DWG Approved/BT|Y
01|206172|4|1|1st Batch 6/1:DWG Approved by BT|Y
01|206172|5|1|1st Batch 6/1:DWG Approved by BT|Y
01|206172|6|1|1st Batch 7/10:DWG Approved/TR|Y
01|206172|7|1|Req.INS/T/P Inspection Required|Y
01|206174|1|1|This is a non-standard stock item. Once a PO has been|Y
01|206174|1|2|issued it cannot be cancelled or returned.|Y
01|206181|1|1|160-1.510 - 16C Round Collet 1.510|Y
01|206182|1|1|1st Batch 5/23:DWG Approved/BT|Y
01|206182|2|1|1st Batch 5/23:DWG Approved/BT|Y
01|206182|3|1|1st Batch 5/23:DWG Approved/BT|Y
01|206182|4|1|1st Batch 7/6:DWG Approved/TR|Y
01|206182|5|1|Req.INS/T/P Inspection Required|Y
01|206182|6|1|Req.INS/T/P Inspection Required|Y
01|206182|7|1|Req.INS/T/P Inspection Required|Y
01|206182|8|1|1st Batch T/P Inspection Required  5/10/23 approved|Y
01|206182|9|1|1st Batch 7/6 approved by Tim|Y
01|206182|10|1|Req.INS/T/P Inspection Required|Y
01|206182|11|1|1st Batch 7/6:DWG Approved/TR|Y
01|206182|12|1|Req.INS/T/P Inspection Required|Y
01|206185|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|206185|2|2|OKUMA M560V|Y
01|206185|4|1|FREE $2000 TOOLING CERTIFICATE WITH PURCHASE OF|Y
01|206185|4|2|NIKKEN 4TH AXIS ROTARY TABLE.|Y
01|206200|1|1|for CAT50-SK16-55U|Y
01|206200|2|1|for CAT50-SK25-55U-IDU|Y
01|206219|1|1|QCFC 65 Series Self Contained Pneumatic Chuck|Y
01|206219|1|2|Pratt Burnerd - ATL209-65BZI  Atlas air power collet|Y
01|206219|1|3|chuck with recess flatback mount.  Uses QCFC 65 Series|Y
01|206219|1|4|collets.|Y
01|206219|2|1|Adapter plate for mounting the ATL209-65BZI chuck to|Y
01|206219|2|2|5AX-2002 table.|Y
01|206219|3|1|Other needed components including: Manifold Air Lines|Y
01|206219|3|2|(rigid and flexible) Solenoid and Wiring.|Y
01|206219|4|1|Installation includes mounting and plumbing chuck and|Y
01|206219|4|2|air lines @ Lyndex Nikken. Then a service tech will|Y
01|206219|4|3|bring table back to C&A Tool and reinstall on Mori|Y
01|206219|4|4|NV5000 VMC.  Along with reinstalling table on VMC we|Y
01|206219|4|5|will install solenoid air lines from table to inside|Y
01|206219|4|6|machine cabinet.  Solenoid will be wired to spare M|Y
01|206219|4|7|codes.  We will also check table condition and ensure|Y
01|206219|4|8|everything is functioning as it should.|Y
01|206232|1|1|Quoted at NET price.|Y
01|206240|1|1|ALPS X AXIS 10K RPM CAPTO4 OUTPUT LIVE TOOL|Y
01|206240|1|2|NET PRICING; ADD MARGIN TO YOUR QUOTE TO CUSTOMER|Y
01|206240|1|3|Cannot be cancelled or returned.|Y
01|206240|2|1|ALPS Z AXIS 10K RPM CAPTO4 OUTPUT LIVE TOOL|Y
01|206240|2|2|NET PRICING; ADD MARGIN TO YOUR QUOTE TO CUSTOMER|Y
01|206240|2|3|Cannot be cancelled or returned.|Y
01|206246|4|1|Overstock Promo of 20% has been added to the discount.|Y
01|206246|4|2|Tooling is non returnable.|Y
01|206258|1|1|Includes external cable set|Y
01|206258|2|1|Included with table purchase|Y
01|206258|3|1|Included with table purchase|Y
01|206258|4|1|Open House promo|Y
01|206258|5|1|Open House promo|Y
01|206264|6|1|Triag Monobloc Fixture Assy includes: Machined and|Y
01|206264|6|2|assembled base plate|N
01|206265|1|1|All Sales are final!|Y
01|206274|6|1|Replaces SKN-10BJ(GH)|Y
01|206276|2|1|Direct replacement to SKN-10BJ|Y
01|206276|2|2|Woodward has been advised multiple times that SKN-10BJ|Y
01|206276|2|3|was discontinued and replaced by SKN-10KJ|Y
01|206279|1|1|Part # 160-1.510|Y
01|206279|1|2|16C Round Collet 1.510|Y
01|206279|1|3|Once ordered this item cannot be cancelled or returned.|Y
01|206280|10|1|DIRECT Replacement for SKN-10BJ which was discontinued|Y
01|206280|10|2|Woodward has been advised multiple times that SKN-10BJ|Y
01|206280|10|3|was discontinued and SKN-10KJ is the exact same|Y
01|206286|1|1|C6-SLT20-90 PSC C6T 20mm NT Int.Turn Round Tooling|Y
01|206286|1|2|Holder.|Y
01|206288|1|1|C6-SLT20-90 PSC C6T 20mm NT Int.Turn Round Tooling|Y
01|206288|1|2|Holder.|Y
01|206291|4|1|Extra M-Code Cable for 2nd Machine.|Y
01|206307|1|1|Special one time price for used show table 2315|Y
01|206310|1|1|T00433 - O.D. Cutting Holder|Y
01|206310|2|1|T03043 - Boring Bar Holder|Y
01|206310|3|1|T10204 - Face and I.D. Cutting Holder|Y
01|206310|4|1|T32359 - Rotary Tool Holder(O.D. Cutting)|Y
01|206310|5|1|T32660 - Rotary Tool Holder(Face Cutting)|Y
01|206318|1|1|ETA on more if that one is purchased is 3-1/2 months.|Y
01|206328|5|1|CUSTOM POSITIONING BLOCK FOR MAZAK I500 INTEGREX|Y
01|206328|5|2|WITH CAPTO C6 SPINDLE|Y
01|206347|1|1|SPK Clamp|Y
01|206347|2|1|VPA-0620 Clamp screw|Y
01|206347|3|1|PPPC-12 Shim|Y
01|206347|4|1|VPP-0512-KG Shim screw|Y
01|206347|5|1|KLJ-I30  Key|Y
01|206347|6|1|OR-VPA-DC O-ring set|Y
01|206351|1|1|ALL SALES ARE FINAL ON THIS ITEM.|Y
01|206352|1|1|Non-returnable|Y
01|206352|2|1|Non-returnable|Y
01|206357|1|1|Non-returnable|Y
01|206357|2|1|Non-returnable|Y
01|206358|2|1|LN to make positioning block upon receipt of spindle|Y
01|206358|2|2|drawing confirmation|Y
01|206369|2|1|Scale with scale mounting kit|Y
01|206371|19|1|PROMO-SK13-CASE|Y
01|206375|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|206384|1|1|1st Batch/948589/O-M 7/6:DWG Approved by Customer|Y
01|206393|1|1|Req.INS/Box changed. Pls. bring 1pc to KYOKO.|Y
01|206394|1|1|HSK160B-SM1250-3.00|Y
01|206394|1|2|No price break for 6 pcs|Y
01|206398|1|1|HSK63A-C20-95 HSK63A Milling Chuck 20mm 8K RPM|Y
01|206398|1|2|Gage Length 95mm|Y
01|206398|1|3|Please Note: This tool is non standard stock. Once a|Y
01|206398|1|4|purchase order is placed it cannot be cancelled or|Y
01|206398|1|5|returned.|Y
01|206398|2|1|HSK63A-HC6-3.15 HSK63A Hydraulic Chuck 6mm|Y
01|206398|2|2|Please Note: This tool is non standard stock. Once a|Y
01|206398|2|3|purchase order is placed it cannot be cancelled or|Y
01|206398|2|4|returned.|Y
01|206398|2|5|Signed drawing approval required|Y
01|206398|3|1|HSK63A-HC10-3.35  HSK63A Hydraulic Chuck 10mm|Y
01|206398|3|2|Please Note: This tool is non standard stock. Once a|Y
01|206398|3|3|purchase order is placed it cannot be cancelled or|Y
01|206398|3|4|returned.|Y
01|206398|3|5|Signed drawing approval required.|Y
01|206402|17|1|Part # C6-SK10-150|Y
01|206402|20|1|Part # C6-SK16-150|Y
01|206415|5|1|*Net Price|Y
01|206415|5|2|This is a modification and can not be cancel or return|Y
01|206426|4|1|Promotion Overstock for C5017-0025B|Y
01|206454|3|1|8 in stock 2-3 weeks for remaing pieces from Japan|Y
01|206454|5|1|3 in stock 2-3 weeks for remaining pieces from Japan|Y
01|206484|4|1|P/N: HSK50C-SZF20-105|Y
01|206484|4|2|HSK50C Zero Fit Slim Chuck SK20 range 3.5mm-20mm|Y
01|206487|1|1|Replaced part # 170x182x8.5|Y
01|206487|2|1|Replaces part # GS80105|Y
01|206487|11|1|Replaces part # CN252B023|Y
01|206499|1|1|One time offer for trial for 1 pc. only for this time|Y
01|206499|1|2|Standard price will be applied after Trial.|Y
01|206499|1|3|Not cancelable not returnable upon PO|Y
01|206510|1|1|RGA#LVR-60140/|Y
01|206510|1|2|Repair of MZMP47-ER32Z-ICE s/n:21900272 04|Y
01|206510|1|3|(Mimatic#124864)|Y
01|206510|2|1|Bearings seals and o-rings to be replaced.|Y
01|206510|4|1|RGA#LVR-60140/|Y
01|206510|4|2|Repair of MZMP47-ER32Z s/n:74536 13 (Mimatic#124619)|Y
01|206510|5|1|Bearings seals o-rings and damaged input & output|Y
01|206510|5|2|spindle to be replaced.|Y
01|206520|2|1|Table to be set up identical to customer's existing|Y
01|206520|2|2|CNC260FA-M (SERIAL#6340).  This table TAT booster|Y
01|206520|2|3|and cable set will be used as plug and play replacement|Y
01|206520|2|4|for existing table during PM work.|Y
01|206555|5|1|*Net Price|Y
01|206555|5|2|This is a modification and can not be cancel or return|Y
01|206555|6|1|*Net Price|Y
01|206555|6|2|Modification ITEN no cancel and returnable|Y
01|206558|5|1|INCLUDES A TOTAL OF 8 HOURS FOR TRAINING & INSTALL|Y
01|206560|5|1|Installation and Training is included at no charge.|Y
01|206560|5|2|$3600.00 Value|Y
01|206561|1|1|RGA#CUR-60128/|Y
01|206561|1|2|Repair of C40RA-0025M s/n:18902340 03 (Mimatic#175241)|Y
01|206561|2|1|Bearings seals o-rings and damaged gears to be|Y
01|206561|2|2|replaced.|Y
01|206564|6|1|Items 1-3 qualify only|Y
01|206570|1|1|BMT65-ER32X-OFF-HS2  195807|Y
01|206570|1|2|BMT65 Straight offset A-50 1sp. L99.5 AL112|Y
01|206570|1|3|ER32 External coolant 1:2 gear Max 11500RPM|Y
01|206570|2|1|BMT65-ER32X-OFF-HS2-ICE  193823|Y
01|206570|2|2|BMT65 straight. offset A=50 1Sp.  L99.5 AL112|Y
01|206570|2|3|ER32 INT/external/ ICE coolant 1015PSI|Y
01|206570|2|4|1:2GEAR MAX 11500RPM|Y
01|206578|2|1|Promo applies to the above.Cannot be cancelled or|Y
01|206578|2|2|returned.|Y
01|206581|1|1|Non-returnable|Y
01|206581|2|1|Non-returnable|Y
01|206581|6|1|NK105-49000 but with a 2:1 Gear Ratio|Y
01|206581|6|2|This item is speical once ordered it cannot be|Y
01|206581|6|3|cancelled or returned.|Y
01|206581|7|1|NK105-33000 but with a 2:1 Gear Ratio|Y
01|206581|7|2|This item is speical once ordered it cannot be|Y
01|206581|7|3|cancelled or returned.|Y
01|206583|1|1|4 pieces in stockadditional pieces 2-3 wks from Japan|Y
01|206588|1|1|RGA#TOR-60126/|Y
01|206588|1|2|Repair of CAT40-UMT200UW|Y
01|206588|3|1|Calibration service included.|Y
01|206595|1|1|P/N: TBD C8-MRAM-164L|Y
01|206595|1|2|Modular Angle Head Taper PSC C8; L=163.7mm|Y
01|206600|15|1|SPECIAL - NON-CANCELABLE & NON-RETURNABLE|Y
01|206600|17|1|SPECIAL - NON-CANCELABLE & NON RETURNABLE|Y
01|206600|19|1|SPECIAL - NON-CANCELABLE & NON-RETURNABLE|Y
01|206600|20|1|SPECIAL - NON-CANCELABLE & NON-RETURNABLE|Y
01|206600|23|1|SPECIAL - NON-CANCELABLE & NON-RETURNABLE|Y
01|206600|24|1|SPECIAL - NON-CANCELABLE & NON-RETURNABLE|Y
01|206632|1|1|DIN Coolant Through the Flange|Y
01|206632|3|1|**Coolant Through the tool|Y
01|206632|3|2|**LN will plug DIN holes at no charge|Y
01|206632|5|1|All sales are final. Once stock is depleted items|Y
01|206632|5|2|will need to be requoted.|Y
01|206632|5|3|These are slow moving stock sold at extra discount.|Y
01|206632|5|4|Units cannot be cancelled or returned.|Y
01|206644|1|1|Calibration service for E578M s/n:1784|Y
01|206644|1|2|This is a time based estimate.|Y
01|206644|1|3|Any parts that would be required would be additional.|Y
01|206662|1|1|Mimatic Part # 164419|Y
01|206662|2|1|Mimatic Part # 163703|Y
01|206662|3|1|Mimatic Part # 178296|Y
01|206663|3|1|ALL SALES FINAL NON-CANCELABLE & NON RETURNABLE|Y
01|206665|8|1|SMOOTH JAWS FOR FINISH MACHINING|Y
01|206665|8|2|COMPATIBLE WITH 194-192A AND 101-2560A|Y
01|206665|9|1|ROUGH JAWS - SHARP EDGE|Y
01|206665|9|2|COMPATIBLE WITH 194-192A AND 101-2560A|Y
01|206665|10|1|ZC PN 35736 JAW ADAPTER|Y
01|206665|10|2|THIS ALLOWS FOR 2 JAWS PER SIDE TO BE INSTALLED|Y
01|206665|10|3|ON THE VICE GIVING APPROX 240MM GRIP LENGTH|Y
01|206665|13|1|Adpter plate for workholding platform|Y
01|206674|1|1|RGA#TAR-60172|Y
01|206674|1|2|5AX130 SN:6030|Y
01|206682|2|1|P/N: MZQT47-ER32X-OFF-HS2-ICE|Y
01|206682|2|2|Mazak VDI40 Live ER32 X<Radial>STRT Offset HiSpeed|Y
01|206682|2|3|IntExtCoolant CAN RUN DRY 24/7|Y
01|206682|2|4|1:2 Gear 5.75K_in 11.5K_out|Y
01|206695|1|1|RGA#CUR-60177/|Y
01|206695|1|2|Repair of C40RAM-ER11-208ST-65TP s/n:67193 01|Y
01|206695|1|3|(Mimatic#185012)|Y
01|206695|2|1|Bearings seals o-rings and broken gears to be|Y
01|206695|2|2|replaced.|Y
01|206708|1|1|Includes external cable sets|Y
01|206730|1|1|Req.INS/Install E11-NUT & ER11-SCREW(C)|Y
01|206730|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|206730|3|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|206730|4|1|1st Batch/Install E20-NUT & ER20-SCREW(C)|Y
01|206730|5|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|206730|6|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|206730|7|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|206730|8|1|1st Batch/Install E25-NUT-G & ER25-SCREW(C)|Y
01|206759|1|1|These are considered special and cannot be returned.|Y
01|206773|1|1|This is a non-standard stock item and is considered|Y
01|206773|1|2|special. Once ordered it cannot be canceled or returned|Y
01|206780|3|1|To install BIS-C-122-04/L into holders quoted on lines|Y
01|206780|3|2|1 and 2|Y
01|206780|4|1|To be intsalled in holders on lines 1 and 2.|Y
01|206789|1|1|Replacement SN#9640|Y
01|206789|1|2|Special RT No Motor 9+1PRJ|Y
01|206789|1|3|Showing Net Price|Y
01|206789|1|4|No cables|Y
01|206789|3|1|Special Match with SN#3881|Y
01|206789|3|2|6+1PRJ|Y
01|206789|3|3|Showing Net price|Y
01|206798|1|1|No MOQ required.|Y
01|206811|2|1|Please Note: Overstock extra 20% discount added to the|Y
01|206811|2|2|quote.|Y
01|206816|6|1|Please note: Promotional discount of 20% has been|Y
01|206816|6|2|applied to this quote. Tooling is not returnable.|Y
01|206818|12|1|This item is discontinued and cannot be returned.|Y
01|206840|1|1|356-T6/319-T5 CAT40 DUAL CONTACT|Y
01|206840|1|2|min 14mm = 47 no more than 2x d = 85.1 min 68mm =35|Y
01|206840|2|1|356-T6/319-T5 CAT40 DUAL CONTACT|Y
01|206840|2|2|Min 14mm = 10 no more than 2x d = 22.1 min 68mm=35|Y
01|206853|1|1|ALL SALES ARE FINAL CANNOT BE RETURNED.|Y
01|206854|1|1|Tilt Rotary Table with HAAS Motors and Cables|Y
01|206854|2|1|On-Site Installation of 5AX-130 on Capable HAAS VMC.|Y
01|206854|3|1|***FREE***$2000 Tooling Certificate with Purchase.***|Y
01|206854|3|2|Tooling Certificate is good for $2000 of list priced|Y
01|206854|3|3|tool holders and/or accessories of customer's choice|Y
01|206868|1|1|Sales are final. Cannot be returned|Y
01|206896|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|206910|1|1|1st Batch 7/6:DWG Approved/TR|Y
01|206910|2|1|1st Batch 7/6:DWG Approved/TR|Y
01|206910|3|1|Req.INS/T/P Inspection Required|Y
01|206910|4|1|Req.INS/T/P Inspection Required|Y
01|206918|5|1|*Net Price|Y
01|206918|5|2|This is a modification and can not be cancel or return|Y
01|206918|6|1|*Net Price|Y
01|206918|6|2|Modification ITEN no cancel and returnable|Y
01|206941|2|1|The extra 20% promotion discount has been added to this|Y
01|206941|2|2|quote. Please note tooling non returnable.|Y
01|206942|1|1|1st Batch|Y
01|206942|2|1|1st Batch|Y
01|206942|3|1|1st Batch|Y
01|206942|4|1|1st Batch|Y
01|206998|1|1|***This is for an E346+ Demo Unit. First come first|Y
01|206998|1|2|served. If it is purchased before you order orgiginal|Y
01|206998|1|3|discount of 30% can only be given.**|Y
01|206998|2|1|**Demo first come first served**|Y
01|206998|7|1|**Demo first come first served**|Y
01|206998|8|1|**Demo first come first served**|Y
01|206998|9|1|**Demo first come first served**|Y
01|206999|6|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|207000|1|1|The draw tube is dynamic balanced to Class G6.3.|Y
01|207000|1|2|Draw Tube (66 mm ID 78 mm OD M78 x 2P Cylinder M75 x|Y
01|207000|1|3|2P Chuck 632 mm OAL) ID: 2.600 + .005/-0|Y
01|207011|9|1|BT30-FMH16-37-35|Y
01|207011|9|2|BT30 Face Mill Arbor 16mm Coolantports|Y
01|207011|9|3|* Net Price|Y
01|207011|13|1|Tool Assmbly fee per tool at NET price each|Y
01|207016|1|1|replaces C5016-0750-4.00|Y
01|207016|2|1|replaces C5016-0750-6.00|Y
01|207016|3|1|replaces C5016-1000-4.00|Y
01|207016|4|1|replaces C5016-1000-6.00|Y
01|207016|5|1|replaces C5016-0625-4.00|Y
01|207016|6|1|replaces C5026-0625-6.00|Y
01|207029|5|1|INCLUDES 8 HOURS TOTAL FOR INSTALLATION & TRAINING|Y
01|207030|5|1|INCLUDES 8 HOURS TOTAL FOR INSTALLATION & TRAINING|Y
01|207031|5|1|INCLUDES 8 HOURS TOTAL FOR INSTALLATION & TRAINING|Y
01|207035|1|1|Req.INS/Install E11-NUT & ER11-SCREW(C)|Y
01|207035|2|1|Req.INS/Install E11-NUT & ER11-SCREW(C)|Y
01|207035|3|1|Req.INS/Install E20-NUT & ER20-SCREW(S)|Y
01|207035|4|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|207035|5|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|207035|6|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|207035|7|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|207035|8|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|207035|9|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|207035|10|1|1st Batch/Install E40-NUT & ER40-SCREW(C)|Y
01|207035|11|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|207035|12|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|207035|13|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|207035|14|1|Req.INS/Install E25-NUT-G & ER25-SCREW(C)|Y
01|207037|1|1|Nikken HSK63T-SLT10-80|Y
01|207037|1|2|HSK63T 10mm IntTurn Round Tooling Holder|Y
01|207042|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|207045|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|207048|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|207051|1|1|RGA#LVR-60130/|Y
01|207051|1|2|Repair of MZMP46-ER32X-OFF s/n: n/a (Mimatic#124018>old|Y
01|207051|1|3|part#05.0412.7143.404)|Y
01|207051|2|1|Bearings seals o-rings and worn ER25 spindle to be|Y
01|207051|2|2|replaced.|Y
01|207051|4|1|RGA#LVR-60130/|Y
01|207051|4|2|Repair of MZMP46-ER32X-OFF s/n: n/a (Mimatic#124018>old|Y
01|207051|4|3|part#05.0412.7143.404)|Y
01|207051|5|1|Bearings seals o-rings worn ER25 spindle and|Y
01|207051|5|2|locating pin to be replaced.|Y
01|207069|1|1|RGA#TOR-60077/|Y
01|207069|1|2|Repair of SF-START2-UNIT-200 s/n:2J7046|Y
01|207076|1|1|RGA#LVR-60214/|Y
01|207076|1|2|Repair of OKU-L370-Z s/n:AL579 (Alps#OK101-13000)|Y
01|207076|2|1|Bearings o-rings collet nut and spindle to be|Y
01|207076|2|2|replaced.|Y
01|207076|4|1|RGA#LVR-60214/|Y
01|207076|4|2|Repair of OKU-L370-Z s/n:AL580 (Alps#OK101-13000)|Y
01|207076|5|1|Bearings o-rings collet nut and spindle to be|Y
01|207076|5|2|replaced.|Y
01|207078|8|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|207083|6|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|207085|4|1|Machine must have additional axis software option|Y
01|207085|4|2|Machine must have ladder for additional axis|Y
01|207085|4|3|Includes: Drive unit short bar fiber optic cable|Y
01|207085|4|4|communications cable bulkhead cables external cables|Y
01|207085|4|5|modification to the door cable management service|Y
01|207085|4|6|time and travel.|Y
01|207089|1|1|1st Batch|Y
01|207094|1|1|Or 5AX-350WAR21|Y
01|207104|1|1|Balance of 19 pcs ETA 12/8|Y
01|207110|1|1|Includes: Air/Hyd booster and external cable sets|Y
01|207110|2|1|Includes: Motor motor gear motor mount  wire harness|Y
01|207110|2|2|motor cover soleniod and pressure switch.|Y
01|207110|2|3|8-hours of labour|Y
01|207110|3|1|Core buy back program|Y
01|207118|4|1|Pre-balanced and balanceable|Y
01|207118|4|2|Net price|Y
01|207118|4|3|All sales are final|Y
01|207118|5|1|NET price|Y
01|207118|5|2|All sales are final|Y
01|207138|1|1|QUOTATION FOR FLETCHER POLAND'S TRUNK STOCK UNIT|Y
01|207138|1|2|CURRENTLY AT MASTER MACHINE IN CHATTANOOGA TN.|Y
01|207138|2|1|INCLUDED WITH SHRINK FIT UNIT|Y
01|207153|4|1|FREE TOOLING CERTIFICATE THROUGH 12/31/23|Y
01|207157|1|1|20% OVERSTOCK Promotion applied.|Y
01|207157|1|2|This item cannot be returned.|Y
01|207157|2|1|20% OVERSTOCK Promotion applied|Y
01|207157|2|2|This item cannot be returned.|Y
01|207158|2|1|Included with purchase of QCC-DL65-A5 Collet Chuck.|Y
01|207166|1|1|NBT40-SF6-90CP|Y
01|207166|1|2|Dual Contact will work on BT40 Spindle|Y
01|207166|1|3|BT40 Shrink Fit Holder 6mm CoolantPorts 25K|Y
01|207166|2|1|NBT40-SF8-90CP|Y
01|207166|2|2|Dual Contact will work on BT40 Spindle|Y
01|207166|2|3|BT40 Shrink Fit Holder 8mm CoolantPorts 25K|Y
01|207166|3|1|NBT40-SF10-90CP|Y
01|207166|3|2|Dual Contact will work on BT40 Spindle|Y
01|207166|3|3|BT40 Shrink Fit Holder 10mm CoolantPorts 25K|Y
01|207166|4|1|NBT40-SF12-90CP|Y
01|207166|4|2|Dual Contact will work on BT40 Spindle|Y
01|207166|4|3|BT40 Shrink Fit Holder 12mm CoolantPorts 25K|Y
01|207166|5|1|NBT40-SF16-90CP|Y
01|207166|5|2|Dual Contact will work on BT40 Spindle|Y
01|207166|5|3|BT40 Shrink Fit Holder 16mm CoolantPorts 25K|Y
01|207166|6|1|NBT40-SF20-90CP|Y
01|207166|6|2|Dual Contact will work on BT40 Spindle|Y
01|207166|6|3|BT40 Shrink Fit Holder 20mm CoolantPorts 25K|Y
01|207166|7|1|NBT40-SF25-100CP|Y
01|207166|7|2|Dual Contact will work on BT40 Spindle|Y
01|207166|7|3|BT40 Shrink Fit Holder 25mm CoolantPorts 25K|Y
01|207167|3|1|FMS-10.0-200L|Y
01|207167|3|2|Nikken Carbide Mill Reamer 10mm DCON|Y
01|207167|3|3|200mm overall length|Y
01|207167|3|4|QTY BREAK NET PRICE:|Y
01|207167|3|5|1~4pc $436.00ea|Y
01|207167|3|6|5~9pc $406.00ea|Y
01|207167|3|7|10+pc $362.00ea|Y
01|207167|5|1|FMS-13.0-200L|Y
01|207167|5|2|Nikken Carbide Mill Reamer 13mm DCON|Y
01|207167|5|3|200mm overall length|Y
01|207167|5|4|QTY BREAK NET PRICE:|Y
01|207167|5|5|1~4pc $552.00ea|Y
01|207167|5|6|5~9pc $516.00ea|Y
01|207167|5|7|10+pc $460.00ea|Y
01|207167|12|1|FMS-16.0-200L|Y
01|207167|12|2|Nikken Carbide Mill Reamer 16mm DCON|Y
01|207167|12|3|200mm overall length|Y
01|207167|12|4|QTY BREAK NET PRICE:|Y
01|207167|12|5|1~4pc $622.00ea|Y
01|207167|12|6|5~9pc $580.00ea|Y
01|207167|12|7|10+pc $518.00ea|Y
01|207181|1|1|Includes Haas Motor and Cables.|Y
01|207185|1|1|RGA#TAR-60186|Y
01|207185|1|2|CNCZ180LYA-BR  SN:7019|Y
01|207187|1|1|All sales are final!|Y
01|207190|1|1|RGA#TAR-60186|Y
01|207190|1|2|CNCZ180LYA-BR  SN:7018|Y
01|207215|11|1|Please Note: The Overstock promo has been added to the|Y
01|207215|11|2|discount on this quote.|Y
01|207221|11|1|Please Note: Discount reflects a purchase order of|N
01|207221|11|2|10+ holders.|Y
01|207230|3|1|P/N: H63F-SF0187-4.00|Y
01|207230|3|2|HSK63F taper without Makino Pin 3/16 Shrink Fit Holder|Y
01|207230|4|1|P/N: H63F-SF0250-3.15|Y
01|207230|4|2|HSK63F Taper no Makino pin 1/4 Shrink Fit Holder with|Y
01|207230|4|3|3.15 gauge length|Y
01|207230|5|1|P/N: H63F-SF0312-4.00|Y
01|207230|5|2|HSK63F taper no Makino pin 5/16 Shrink Fit Holder with|Y
01|207230|5|3|4.00 gauge length|Y
01|207230|11|1|P/N: H63F-SF0375-3.15CP|Y
01|207230|11|2|HSK63F Taper no Makino pin 3/8 Shrink Fit Holder with|Y
01|207230|11|3|3.15 gauge length and coolant ports.|Y
01|207239|6|1|Please Note: Overstock Promotional Discount has been|Y
01|207239|6|2|added to this quote.|Y
01|207248|1|1|This is speical once ordered cannot be cancelled or '|Y
01|207248|1|2|returned|Y
01|207260|2|1|Bevel Gear Set|Y
01|207262|2|1|*NET price|Y
01|207262|2|2|LN to thread blank draw nut to match customer's|Y
01|207262|2|3|machine drawtube|Y
01|207262|2|4|Delivery is 2-3 days upon receipt specs from customer.|Y
01|207264|1|1|Includes external cables sets|Y
01|207268|3|1|ATD19-1/2UA Tap Collet  .367 X .275|Y
01|207277|1|1|CAT40-SK20F-120U-IDU-M|Y
01|207279|3|1|This item is being discontinued 10pcs in stock|Y
01|207279|3|2|All sales are final and item cannot be canceled or|Y
01|207279|3|3|returned.  Alternative quoted below that is not|Y
01|207279|3|4|balanceable|Y
01|207291|1|1|This is considered special once ordered cannot be|Y
01|207291|1|2|cancelled or returned.|Y
01|207291|2|1|This is considered special once ordered cannot be|Y
01|207291|2|2|cancelled or returned.|Y
01|207292|1|1|Calibration service for Hathor Six s/n:6282 & Amon Ra|Y
01|207292|1|2|s/n:2098. This is a time based estimate.|Y
01|207292|1|3|Any parts that would be required would be additional.|Y
01|207298|1|1|EVALUATION/REPAIR OF X2 A21-750W CONTROLLERS|Y
01|207298|1|2|X1 ROTARY X1 TILT FOR 5AX-2002WA21  TAR-60208|Y
01|207298|1|3|ALARMS PRESENT: 4001/3001|Y
01|207298|1|4|INSTALL NEW BATTERY + HARD RESET + ENTER NEW PARAMETERS|Y
01|207298|1|5|TEST RUN OK|Y
01|207298|1|6|*** CONTROLLERS MAY NEED PARAMETER ADJUSTMENT WHEN|Y
01|207298|1|7|CUSTOMER RECIEVE BACK IF USING RS232 COMMUNICATION|Y
01|207312|1|1|BT40-SK20-120-J|Y
01|207312|1|2|BT40 Slim Chuck SK20 15K w/JetSlotNut(SKN-20BJ)|Y
01|207312|2|1|HSK63A-SK20C-120-J|Y
01|207312|2|2|HSK63A Slim Chuck SK20 Coolant w/JetSlotNut(SKN-20BJ)|Y
01|207312|10|1|*SP NET PRICE|Y
01|207329|42|1|NET PRICE|Y
01|207337|1|1|THE DISCOUNT GIVEN IS FOR A DEMO UNIT. THE|Y
01|207337|1|2|WARRANTY WILL BE 1 YEAR. THE SAME AS A NEW UNIT.|Y
01|207368|4|1|Please Note: Extra 20% promotion has been added to|Y
01|207368|4|2|the discount on this quote for the HSK40E-SF6-130B.|Y
01|207381|1|1|Includes: Haas motor and cable set motor gear gear|Y
01|207381|1|2|box.|Y
01|207381|2|1|Includes 8-hrs of service time for conversion only.|Y
01|207381|3|1|Inspection of current condition of the table.|Y
01|207384|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4th AXIS|Y
01|207385|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4th AXIS|Y
01|207393|2|1|Addtional 20% discount added to Promo item.|Y
01|207393|2|2|All sales are final|Y
01|207410|1|1|Freight via TRUCK on Q# 207362|Y
01|207410|1|2|1 skid 390lbs to San Diego CA|Y
01|207411|1|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|207411|2|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|207411|3|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|207411|4|1|SF4.9-C16-121 for Drawing 61095963.000|Y
01|207411|19|1|Straight Shank Extension OD16mm Shrink Fit Holder 5.5mm|Y
01|207419|2|1|Additional 20% discount for Overstock Promotion item|Y
01|207419|2|2|Final Sale|Y
01|207419|4|1|Non-cancellable/Non-retunable|Y
01|207419|4|2|Quoted at NET pricing|Y
01|207419|5|1|#163674 Same as above except VDI shaft to ER output|Y
01|207419|5|2|is 85mm|Y
01|207419|5|3|Non-cancellable/Non-returnable|Y
01|207419|5|4|Quoted at NET pricing|Y
01|207421|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|207421|4|1|FULL INSTALL ON DN SOLUTIONS BVM5700 VMC|Y
01|207430|1|1|Includes: Table/Controller/Pendant/Power Cable/M-Code|Y
01|207430|1|2|Cable|Y
01|207430|6|1|Installation of new table on existing machine|Y
01|207430|6|2|setup M-Code signal and RS232 connection|Y
01|207431|7|1|Overstock Promotion pricing|Y
01|207431|7|2|non-cancelable non-returnable|Y
01|207431|8|1|Overstock Promotion pricing|Y
01|207431|8|2|non-cancelable non-returnable|Y
01|207431|9|1|Overstock Promotion pricing|Y
01|207431|9|2|non-cancelable non-returnable|Y
01|207431|10|1|Overstock Promotion applies only to lines 78 and 9 on|Y
01|207431|10|2|this quote.|Y
01|207434|1|1|SPECIAL ORDER = NON-CANCELABLE/NON-RETURNABLE|Y
01|207434|1|2|NET PRICES QUOTED|Y
01|207446|1|1|This item cannot be returned.|Y
01|207453|1|1|This item cannot be returned.|Y
01|207456|8|1|INCLUDES 8 TOTAL HOURS FOR INSTALLATION AND TRAINING|Y
01|207488|1|1|Quote is based on P=82|Y
01|207489|6|1|quoted as an in stock alternative|Y
01|207490|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALLATION & TRAINING|Y
01|207492|8|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|207494|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING.|Y
01|207496|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING.|Y
01|207501|3|1|P/N: H63F-SF0187-4.00|Y
01|207501|3|2|HSK63F taper without Makino Pin 3/16 Shrink Fit Holder|Y
01|207501|3|3|with 4.00 gauge length|Y
01|207501|4|1|P/N: H63F-SF0250-3.15|Y
01|207501|4|2|HSK63F Taper no Makino pin 1/4 Shrink Fit Holder with|Y
01|207501|4|3|3.15 gauge length|Y
01|207501|5|1|P/N: H63F-SF0312-4.00|Y
01|207501|5|2|HSK63F taper no Makino pin 5/16 Shrink Fit Holder with|Y
01|207501|5|3|4.00 gauge length|Y
01|207501|10|1|P/N: H63F-SF0375-3.15CP|Y
01|207501|10|2|HSK63F Taper no Makino pin 3/8 Shrink Fit Holder with|Y
01|207501|10|3|3.15 gauge length and coolant ports.|Y
01|207507|1|1|FYI: if we get an order for this by next Tues Nov 28|Y
01|207507|1|2|We can get the collets mid Dec.|Y
01|207513|1|1|THIS IS FOR A BT30 SK13 TOOL KIT*|Y
01|207515|8|1|Delivery: 10pcs STOCK; 1pcs 1-2wks; bal 12wks|Y
01|207525|2|1|SET OF EXTERNAL CABLES FROM ROTARY TABLE TO BULKHEAD|Y
01|207525|2|2|LENGTH AND SPEC TBD AT A LATER DATE|Y
01|207542|1|1|Includes: Table/Controller/Pendant/Power Cable/M-Code|Y
01|207542|1|2|Cable|Y
01|207542|6|1|Installation of new table on existing machine|Y
01|207542|6|2|setup M-Code signal and RS232 connection|Y
01|207550|1|1|Overrun|Y
01|207550|1|2|Special NET price for 1pc. Once stock is depleted this|Y
01|207550|1|3|must be requoted.|Y
01|207550|4|1|Overrun|Y
01|207550|4|2|Special NET price for 1pc. Once stock is depleted this|Y
01|207550|4|3|must be requoted.|Y
01|207550|10|1|Qty Break NET pricing:|Y
01|207550|10|2|Minimum 2pc Required (2-4pcs) $642.00ea/net|Y
01|207550|10|3|5-9pcs $276.00ea/net|Y
01|207550|10|4|10+pcs $184.00ea/net|Y
01|207556|5|1|Please Note: 10% extra has been added to the discount|Y
01|207556|5|2|on this quote. If quanitites should change please|Y
01|207556|5|3|re-submit for new quote.|Y
01|207560|8|1|Includes a total of 8hrs for install and training.|Y
01|207576|1|1|Req.INS/15mm on Screw Hole|Y
01|207576|2|1|1st Batch 5/23:DWG Approved/BT|Y
01|207576|3|1|1st Batch/ 7/6 APRVD/Tim|Y
01|207576|4|1|1st Batch 7/10:DWG Approved/TR|Y
01|207576|5|1|Req.INS/T/P Inspection Required|Y
01|207576|6|1|Req.INS/T/P Inspection Required|Y
01|207576|7|1|Req.INS/T/P Inspection Required|Y
01|207576|8|1|Req.INS/T/P Inspection Required|Y
01|207576|9|1|Req.INS/T/P Inspection Required|Y
01|207576|10|1|Req.INS/T/P Inspection Required|Y
01|207586|1|1|FYI: if we get an order for this by next Tues Nov 28|Y
01|207586|1|2|We can get the collets mid Dec.|Y
01|207589|1|1|FYI: if we get an order for this by next Tues Nov 28|Y
01|207589|1|2|We can get the collets mid Dec.|Y
01|207596|1|1|Includes following:|Y
01|207596|1|2|x1 1 Port Manifold Block|Y
01|207596|1|3|x1 Dual Acting Solenoid|Y
01|207596|1|4|x1 Pressure Reducing Valve|Y
01|207596|1|5|x1 Pressure Gauge to see Current Hydraulic Pressure|Y
01|207596|1|6|x1 Misc Bolts and assembly Hardware|Y
01|207596|1|7|*** does not include hydraulic hoses ***|Y
01|207599|19|1|PROMO-SK13-CASE|Y
01|207616|2|1|Please Note: Our service department will plug the|Y
01|207616|2|2|balancing holes on these holders per Tim Reeves.|Y
01|207617|1|1|SCE-GA14X1|Y
01|207617|1|2|SAGINAW CONTROL & ENGINEERING ROLLGASKET 1/4 x 1|Y
01|207633|1|1|HSK63A ER11 100mm GL  with Mini Nut.|Y
01|207633|1|2|Part # HSK63A-ER11-100|N
01|207633|1|3|This is special once ordered it cannot be cancelled or|Y
01|207633|1|4|returned|Y
01|207648|1|1|HSK63A ER11 Portapinize ER Mini Collet chuck|Y
01|207648|1|2|Part # TBD|Y
01|207648|1|3|This item is considered special. Once ordered it cannot|Y
01|207648|1|4|be cancelled or returned. Net price has been quoted.|Y
01|207665|2|1|NET PRICE FOR THE POSITIONING BLOCK QUOTED NO FURTHER|Y
01|207665|2|2|DISCOUNTS SHOULD BE TAKEN|Y
01|207665|2|3|MADE TO ORDER ONCE DRAWING IS APPROVED IT IS|Y
01|207665|2|4|NON-CANCELABLE & NON-RETURNABLE|Y
01|207668|11|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|207671|5|1|**not available as standard in HSK63A or CAT40|Y
01|207671|8|1|Pre-balanced and balanceable|Y
01|207671|8|2|All Sales are final. Special pricing- Overstock!|Y
01|207671|9|1|*not Pluggable coolant ports|Y
01|207671|11|1|Pre-balanced and balanceable|Y
01|207671|11|2|All Sales are final. Special pricing- Overstock!|Y
01|207671|14|1|Pre-balanced and balanceable!|Y
01|207671|14|2|All Sales are final. Special pricing- Overstock!|Y
01|207671|18|1|Pre-balanced and balanceable|Y
01|207671|18|2|All Sales are final. Special pricing- Overstock!|Y
01|207671|27|1|Includes:  2pc SF-POT-HSK100 at no add. charge|Y
01|207671|27|2|Max discount applied|Y
01|207671|28|1|1pc for SF machine/ 1pc for cooling station|Y
01|207671|29|1|1pc for SF machine/ 1pc for cooling station|Y
01|207685|1|1|ALL SALES FINAL NON-CANCELABLE AND NON-RETURNABLE|Y
01|207685|1|2|ONLY 2 PIECES LEFT IN STOCK|Y
01|207690|1|1|Part# to be created after order is placed|Y
01|207690|1|2|Possible# is HSK63T-SLT32-115|Y
01|207690|1|3|SPECIAL ORDER = NON-CANCELABLE/NON-RETURNABLE|Y
01|207692|1|1|Part # TBD N/A NK105-33000 With 2:1 Gear Ratio|Y
01|207692|1|2|Nakamura Live ER32 Z<Axial>90D IntCool7MP 6K CH90|Y
01|207692|1|3|Compared to NK105-33000 the center height is increased|Y
01|207692|1|4|from 65mm to 90mm|Y
01|207694|2|1|CAT50-C1.1/4-90UG-IDU|Y
01|207699|3|1|Fall Special: Free $2000.00 Tool Cert with purchase|Y
01|207699|3|2|of 4th axis table.|Y
01|207711|1|1|1st Batch 8/3:DWG APRVED/BT|Y
01|207717|4|1|Speical Discount is applied. this time only|Y
01|207745|4|1|Demo Unit includes 6 month warranty|Y
01|207755|1|1|This will also work for Capto 4.|Y
01|207755|1|2|Item is considered special once ordered cannot be|Y
01|207755|1|3|cancelled or returned.|Y
01|207767|2|1|Part # 9TACL63D-HSK40|Y
01|207767|3|1|TACL-B50H100|Y
01|207767|4|1|9TACL100D-B40H63|Y
01|207772|14|1|NBT30-SF0250-6.30CP|Y
01|207772|14|2|Dual Contact BT30 Shrink Fit w/ 6.30gage length|Y
01|207772|14|3|pluggage coolant ports|Y
01|207772|14|4|DRAWING APPROVAL REQUIRED|Y
01|207772|14|5|SPECIAL ORDER = NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|14|6|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|207772|15|1|NBT30-SF0250-6.30CP|Y
01|207772|15|2|Dual Contact BT30 Shrink Fit w/ 6.30gage length|Y
01|207772|15|3|pluggable coolant ports|Y
01|207772|15|4|DRAWING APPROVAL REQUIRED|Y
01|207772|15|5|SPECIAL ORDER = NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|15|6|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|207772|17|1|NBT30-SF0375-6.30CP|Y
01|207772|17|2|Dual Contact BT30 3/8 Shrink Fit w/ 6.30 gage length|Y
01|207772|17|3|pluggable coolant ports|Y
01|207772|17|4|DRAWING APPROVAL REQUIRED|Y
01|207772|17|5|SPECIAL ORDER = NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|17|6|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|207772|18|1|NBT30-SF0375-6.30CP|Y
01|207772|18|2|Dual Contact BT30 3/8 Shrink Fit w/ 6.30 gage length|Y
01|207772|18|3|Pluggable coolant ports|Y
01|207772|18|4|DRAWING APPROVAL REQUIRED|Y
01|207772|18|5|SPECIAL ORDER = NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|18|6|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|207772|20|1|NBT30-SF0500-6.30CP|Y
01|207772|20|2|Dual Contact BT30 1/2 Shrink Fit w/ 6.30 gage length|Y
01|207772|20|3|pluggable coolant ports|Y
01|207772|20|4|DRAWING APPROVAL REQUIRED|Y
01|207772|20|5|SPECIAL ORDER = NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|20|6|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|207772|21|1|NBT30-SF0500-6.30CP|Y
01|207772|21|2|Dual Contact BT30 1/2 Shrink Fit w/ 6.30 gage length|Y
01|207772|21|3|pluggable coolant ports|Y
01|207772|21|4|DRAWING APPROVAL REQUIRED|Y
01|207772|21|5|SPECIAL ORDER = NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|21|6|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|207772|23|1|NBT30-SF0250-6.00CP|Y
01|207772|23|2|Dual Contact BT30 1/4 Shrink Fit w/ 6.00 gage length|Y
01|207772|23|3|pluggable coolant ports|Y
01|207772|23|4|DRAWING APPROVAL REQUIRED|Y
01|207772|23|5|Special order - NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|23|6|NET PRICE QUOTED NO FURTHER DISOCUNTS|Y
01|207772|24|1|NBT30-SF0250-6.00CP|Y
01|207772|24|2|Dual Contact BT30 1/4 Shrink Fit w/ 6.00 gage length|Y
01|207772|24|3|pluggable coolant ports|Y
01|207772|24|4|DRAWING APPROVAL REQUIRED|Y
01|207772|24|5|Special order - NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|24|6|NET PRICE QUOTED NO FURTHER DISOCUNTS|Y
01|207772|26|1|NBT30-SF0375-6.00CP|Y
01|207772|26|2|Dual Contact BT30 3/8 Shrink Fit w/ 6.00 gage length|Y
01|207772|26|3|pluggable coolant ports|Y
01|207772|26|4|DRAWING APPROVAL REQUIRED|Y
01|207772|26|5|Special order - NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|26|6|NET PRICE QUOTED NO FURTHER DISOCUNTS|Y
01|207772|27|1|NBT30-SF0375-6.00CP|Y
01|207772|27|2|Dual Contact BT30 3/8 Shrink Fit w/ 6.00 gage length|Y
01|207772|27|3|pluggable coolant ports|Y
01|207772|27|4|DRAWING APPROVAL REQUIRED|Y
01|207772|27|5|Special order - NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|27|6|NET PRICE QUOTED NO FURTHER DISOCUNTS|Y
01|207772|29|1|NBT30-SF0500-6.00CP|Y
01|207772|29|2|Dual Contact BT30 1/2 Shrink Fit w/ 6.00 gage length|Y
01|207772|29|3|pluggable coolant ports|Y
01|207772|29|4|DRAWING APPROVAL REQUIRED|Y
01|207772|29|5|Special order - NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|29|6|NET PRICE QUOTED NO FURTHER DISOCUNTS|Y
01|207772|30|1|NBT30-SF0500-6.00CP|Y
01|207772|30|2|Dual Contact BT30 1/2 Shrink Fit w/ 6.00 gage length|Y
01|207772|30|3|pluggable coolant ports|Y
01|207772|30|4|DRAWING APPROVAL REQUIRED|Y
01|207772|30|5|Special order - NON-CANCELABLE/NON-RETURNABLE|Y
01|207772|30|6|NET PRICE QUOTED NO FURTHER DISOCUNTS|Y
01|207773|1|1|KM42-38.25|Y
01|207798|3|1|Please Note: Overstock discount of 20% has been|Y
01|207798|3|2|applied to the B4017-0016-4.00B.|Y
01|207837|1|1|Mimatic Part # 192559|Y
01|207837|1|2|DTH Mazak angular swiveling version adjustable +/-107d|Y
01|207837|1|3|VDI50 ER25 1:2 ICE|Y
01|207837|1|4|shank VDI 50 similar DIN 69880 (ISO 10889)|Y
01|207837|1|5|dihedral drive shank length S/S1 = 75/85 mm|Y
01|207837|1|6|tooling interface for collet system|Y
01|207837|1|7|ER25 (05-160mm) according DIN 6499|Y
01|207837|1|8|internal coolant supply through the spindle ICE|Y
01|207837|1|9|and external through pipe;|Y
01|207837|1|10|continuous dry run possible with sufficient|Y
01|207840|1|1|This is the table without any motor or wiring.  If a|Y
01|207840|1|2|motor and wiring is required we will need the EBILL|Y
01|207840|1|3|from the machine and will supply a revised quote.|Y
01|207856|16|1|This item is special and cannot be canceled or returned|Y
01|207856|22|1|This is speical cannot be canceled or returned|Y
01|207856|23|1|This is speical cannot be canceled or returned|Y
01|207856|24|1|This is speical cannot be canceled or returned|Y
01|207856|26|1|This is speical cannot be canceled or returned|Y
01|207856|27|1|This is speical cannot be canceled or returned|Y
01|207856|28|1|This is speical cannot be canceled or returned|Y
01|207856|35|1|This item is special and cannot be canceled or returned|Y
01|207856|36|1|This item is special and cannot be canceled or returned|Y
01|207856|39|1|This item is special and cannot be canceled or returned|Y
01|207856|40|1|This item is special and cannot be canceled or returned|Y
01|207857|3|1|Includes: Dual axis drive unit short bar fiber optic|Y
01|207857|3|2|cables communications cables bulkhead cables 2-sets|Y
01|207857|3|3|external cables 2-sets parameter changes service|Y
01|207857|3|4|time and travel.|Y
01|207859|29|1|SPECIAL ORDER = NON-CANCELABLE/NON-RETURNABLE|Y
01|207861|1|1|NSVX400MA QUOTED DOES NOT HAVE MOTOR INSTALLED. THIS|Y
01|207861|1|2|QUOTATION INCLUDES 7+1 ROTARY JOINT AND TAT-401N|Y
01|207861|1|3|SUPPORT TABLE.|Y
01|207869|1|1|Mimatic Part #195807 for Straight Offset A=50 1Sp.|Y
01|207869|1|2|1~2 ratio L99.5 AL112 BMT65 ER32 External Coolant|Y
01|207869|1|3|for Doosan Puma. Shank BMT65 Drive Length S1=112|Y
01|207869|1|4|Drive 2-flat 10mm Tooling Interface for Collet System|Y
01|207869|1|5|ER32 (1.0~20.0mm)according DIN 6499. External Coolant|Y
01|207869|1|6|supply over coolant pipe Continuous dry run possible|Y
01|207869|1|7|Direction of rotation reversal output spin is reversal|Y
01|207869|1|8|Central offset V=50 max torque: M(max out)=40Nm|Y
01|207869|1|9|max revolution n1(max) = 5.750 rpm n2(max)=11.500 rpm.|Y
01|207875|1|1|1st Batch|Y
01|207889|1|1|One time special price|Y
01|207891|1|1|RGA#LVR-60204/|Y
01|207891|1|2|Repair of MZQT47-ER32Z-MS-OFF s/n:19902755 04|Y
01|207891|1|3|(Mimatic#183779)|Y
01|207891|2|1|Bearings seals and o-rings to be replaced.|Y
01|207893|6|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|207900|1|1|Includeds motors and cables|Y
01|207900|2|1|Includes motors and cables|Y
01|207914|1|1|1st Batch|Y
01|207914|2|1|1st Batch|N
01|207925|3|1|*pluggable coolant ports|Y
01|207936|4|1|Quoted at net Pricing|Y
01|207945|3|1|Please Note: Promotion discount of 20% has been added|Y
01|207945|3|2|to the discount on this quote.|Y
01|207951|1|1|RGA#LVR-60199/|Y
01|207951|1|2|Repair of 05.0611.7341.505 s/n:5680 06|Y
01|207951|1|3|(Mimatic#124259)|Y
01|207951|2|1|Bearings seals and o-rings to be replaced.|Y
01|207958|1|1|LCH20-SK16|Y
01|207958|1|2|Straight Shank 20mm SK16 Adjust type Centering Holder|Y
01|207958|5|1|LCH25-SK16|Y
01|207958|5|2|Straight Shank 25mm SK16 Adjust type Centering Holder|Y
01|207960|1|1|This quote would reflect selling the consignment unit|Y
01|207960|1|2|located at Concept machine. If they don't use all items|Y
01|207960|1|3|on this quote. They can be sent back to us at LN.|Y
01|207961|5|1|Core buy buy back promo|Y
01|207961|7|1|Complete rebuild|Y
01|207963|4|1|Additional 20% Overstok promo added.|Y
01|207963|4|2|Final Sale|Y
01|207971|1|1|LCH20-SK16|Y
01|207971|1|2|Straight Shank 20mm SK16 Adjust type Centering Holder|Y
01|207971|5|1|LCH25-SK16|Y
01|207971|5|2|Straight Shank 25mm SK16 Adjust type Centering Holder|Y
01|207973|2|1|MADE TO ORDER NON-CANCELABLE/NON-RETURNABLE AFTER|Y
01|207973|2|2|RECEPIT OF PO|Y
01|207974|1|1|This item is not returnable.|Y
01|207981|2|1|Please note: The extra 20% promotion has been added to|Y
01|207981|2|2|the discount on this quote.|Y
01|208016|8|1|THIS IS A BEARING NUT; BETTER QUALITY THAN SOLID NUT|Y
01|208023|1|1|Part Number TBD / Mimatic #140066|Y
01|208023|1|2|CAT50-C6 Output Offset No Coolant 360-Degree Rotation|Y
01|208023|1|3|Quoted at NET price|Y
01|208034|2|1|Included with the shrink fit machine.|Y
01|208034|4|1|SF-POT-C-8 Shrink Fit: Pot/Chuck Holder C-8|Y
01|208052|1|1|Please Note: This collect is non standard stock.|Y
01|208052|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|208052|1|3|or returned.|Y
01|208062|1|1|Qty break 1-2 pcs 22% discount. (7335.12 each net)|Y
01|208062|1|2|3 pcs 25% discount (7053 each net)|Y
01|208071|6|1|TRIAG MONOBLOC FIXTURE ASSY Includes: Base Plate|Y
01|208071|6|2|Triag Monobloc with face plates Op 10 fixture (2X)|Y
01|208071|6|3|with 8 custom stop blocks Op 20 fixtures (2X)|Y
01|208071|6|4|Machined and assembled complete per concept drawing.|Y
01|208071|6|5|Includes 1 riser blocks for rotary table and support.|Y
01|208079|1|1|P/N: TBD C8-MRAM-164L|Y
01|208079|1|2|Modular Angle Head Taper PSC C8; L=163.7mm|Y
01|208079|2|1|P/N: TBD C8-MRAM-164L|Y
01|208079|2|2|Modular AngleHead Taper PSC C8; L=163.7mm|Y
01|208084|3|1|130mm (5.12) Diameter Faceplate|Y
01|208084|5|1|200mm (7.87) Diameter Faceplate|Y
01|208084|13|1|With Haas Motors.|Y
01|208092|1|1|RGA#LVR-60271/|Y
01|208092|1|2|Repair of MNZ20-SK16X-ICE-12K s/n:19903864 13|Y
01|208092|1|3|(Mimatic#193568)|Y
01|208092|2|1|Bearings seals o-rings and measuring set screw to be|Y
01|208092|2|2|replaced.|Y
01|208092|4|1|RGA#LVR-60271/|Y
01|208092|4|2|Repair of MNZ20-SK16X-ICE-12K s/n:20905017 02|Y
01|208092|4|3|(Mimatic#193568)|Y
01|208092|5|1|Bearings seals o-rings and threadring to be replaced.|Y
01|208092|7|1|RGA#LVR-60271/|Y
01|208092|7|2|Repair of MNZ20-SK16X-ICE-12K s/n:20905017 03|Y
01|208092|7|3|(Mimatic#193568)|Y
01|208092|8|1|Bearings seals and o-rings to be replaced.|Y
01|208092|10|1|RGA#LVR-60271/|Y
01|208092|10|2|Repair of MNZ20-SK16Z-ICE-12K s/n:20905241 06|Y
01|208092|10|3|(Mimatic#193643)|Y
01|208092|11|1|Bearings seals and o-rings to be replaced.|Y
01|208097|4|1|CARBIDE EXTENSION|Y
01|208097|5|1|CARBIDE EXTENSION|Y
01|208097|6|1|SLEEVE SO 25MM EXTENSIONS CAN BE USED IN YOUR|Y
01|208097|6|2|EXISTING 1.1/4 MILLING CHUCKS|Y
01|208102|2|1|Hydraulic unit with 4-sets of solenoid and pressure|Y
01|208102|2|2|switches for the brake system.|Y
01|208105|1|1|1pc in stock in IL additional pieces 12-14wks ARO|Y
01|208106|1|1|TAR-60253 NST-500HP MFG: 07/1972|Y
01|208106|1|2|CUSTOMER SENT IN FOR REPAIR/EVAULATION|Y
01|208106|1|3|WORM WHEEL/SCREW IS IN OK CONDITION - ADJUST BACKLASH|Y
01|208106|1|4|REPLACE BEARINGS AND SEALS|Y
01|208108|4|1|CARBIDE EXTENSION|Y
01|208108|5|1|CARBIDE EXTENSION|Y
01|208108|6|1|SLEEVE SO 25MM EXTENSIONS CAN BE USED IN YOUR|Y
01|208108|6|2|EXISTING 1.1/4 MILLING CHUCKS|Y
01|208118|1|1|Part # CAT40-ER25-4.00DIN-M|Y
01|208118|1|2|CAT40 ER25 4 solid nut holder with DIN coolant thru|Y
01|208118|1|3|the flange (4-Hole DIN)|Y
01|208118|1|4|This item is considered special once ordered it cannot|Y
01|208118|1|5|be cancelled or returned.|Y
01|208119|1|1|8500 max RPM|Y
01|208119|2|1|8500 max RPM|Y
01|208119|3|1|1:2Gear 6.5K RPM in 13K RPM out|Y
01|208122|2|1|P/N: CAT40-C3/4F-85U-IDU-M|Y
01|208122|2|2|This is the final part number after modification|Y
01|208123|2|1|to hold 17/64|Y
01|208123|3|1|to hold 13/32|Y
01|208123|4|1|to hold 9/32|Y
01|208123|5|1|to hold 5/32|Y
01|208123|6|1|to hold 17/32|Y
01|208123|8|1|to hold 11/32|Y
01|208123|9|1|to hold 11/64|Y
01|208123|11|1|to hold 9/64|Y
01|208137|3|1|Please Note: Overstock promotion 20% discount added|Y
01|208137|3|2|to this item.|Y
01|208145|2|1|to hold 17/64|Y
01|208145|3|1|to hold 13/32|Y
01|208145|4|1|to hold 9/32|Y
01|208145|5|1|to hold 5/32|Y
01|208145|6|1|to hold 17/32|Y
01|208145|8|1|to hold 11/32|Y
01|208145|9|1|to hold 11/64|Y
01|208145|11|1|to hold 9/64|Y
01|208154|11|1|BT35 Master Gauge|Y
01|208154|12|1|40taper to 35 taper reducer|Y
01|208157|3|1|Kit includes: Dual axis drive unit fiber optic cables|Y
01|208157|3|2|communications cables bulkhead cables 2-sets and|Y
01|208157|3|3|external cables 2-sets.|Y
01|208165|1|1|standard non-coolant collet|Y
01|208175|1|1|Master Jaws for H01MA15 Howa Chuck  (3pc/set)|Y
01|208175|1|2|part# TBD|Y
01|208177|2|1|OKEX-ER32X-OFF-ICE|Y
01|208177|2|2|MIM#192665|Y
01|208177|2|3|DESIGN 3-4 WEEKS ARO 14-16 WEEKS ETA AFTER DESIGN IS|Y
01|208177|2|4|SIGNED AND APPROVED|Y
01|208187|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|208192|1|1|Special- cannot be cancelled or returned|Y
01|208208|1|1|RGA#TOR-60157/|Y
01|208208|1|2|Repair of CAT50U-NX5-151 s/n:KJ-100|Y
01|208221|1|1|1st Batch/ 9/11:DWG Saved in Teams File.|Y
01|208221|2|1|1st Batch 6/27:DWG Saved in Teams File.|Y
01|208227|1|1|Please Note: This is 1-pc price.|Y
01|208227|2|1|Please Note: This is 2-pc price.|Y
01|208227|2|2|Delivery is 13~14 weeks upon receipt of order.|Y
01|208230|9|1|*Please note 60mm length not available in Dual Contact|Y
01|208230|10|1|*Please note 60mm length not available in Dual Contact|Y
01|208234|3|1|Please Note: Overstock promotion discount of 20% has|Y
01|208234|3|2|been added to the LCH1.1/2-SZF16S-55-A.|Y
01|208244|1|1|RGA#CUR-60257/|Y
01|208244|1|2|Repair of C50RAM-ER25-215ST-110TP s/n:20903394 01|Y
01|208244|1|3|(Mimatic#184454)|Y
01|208244|2|1|Bearings seals o-rings and 2 thread rings to be|Y
01|208244|2|2|replaced.|Y
01|208252|1|1|1st Batch|Y
01|208252|2|1|1st Batch|Y
01|208327|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|208342|1|1|RGA#TOR-60313/|Y
01|208342|1|2|Repair of C40R5-0562-2.87(c)|Y
01|208345|9|1|INCLUDES A TOTAL OF 16 HOURS FOR INSTALL & TRAINING|Y
01|208347|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|208347|2|1|Req.INS/Install E11-NUT & ER11-SCREW(C)|Y
01|208347|3|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|208347|4|1|1st Batch|Y
01|208347|5|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|208347|6|1|Req.INS/Install E32-NUT|Y
01|208347|7|1|1st Batch|Y
01|208347|8|1|1st Batch|Y
01|208347|9|1|1st Batch/956438 Patriot *Spec Change 8/18 DWG Approved|Y
01|208347|10|1|1st Batch/956438 Patriot *Spec Change 8/18 DWG Approved|Y
01|208347|11|1|1st Batch/956438 Patriot *Spec Change 8/18 DWG Approved|Y
01|208347|12|1|1st Batch/956438 Patriot *Spec Change 8/18 DWG Approved|Y
01|208347|13|1|Req.INS/Install E32-NUT-G & ER32-SCREW(C)|Y
01|208347|14|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|208354|2|1|Lyndex-Nikken to make position block upon receipt|Y
01|208354|2|2|of spindle drawing confirmation|Y
01|208354|2|3|Quoted at Net price.|Y
01|208358|1|1|Cheersun BOAT #11242301-B: No INS Req'd.|Y
01|208358|2|1|Cheersun BOAT #11242301-B: No INS Req'd.|Y
01|208358|3|1|Cheersun BOAT #11242301-B: No INS Req'd.|Y
01|208358|4|1|Cheersun BOAT #11242301-B: No INS Req'd.|Y
01|208358|5|1|Cheersun BOAT #11242301-B: No INS Req'd.|Y
01|208358|6|1|Cheersun BOAT #11242301-B: No INS Req'd.|Y
01|208358|7|1|Cheersun BOAT #11242301-B: No INS Req'd.|Y
01|208358|8|1|Cheersun BOAT #11242301-B: No INS Req'd.|Y
01|208366|1|1|match s/n.16449 / 16450|Y
01|208366|1|3|TAT-105N|Y
01|208366|1|4|Support Table 105mm Face Plate Air Brake|Y
01|208366|2|1|match (TAT-105N) s/n.16449 / 16450|Y
01|208369|4|1|This is a coolant thru pull stud.  If coolant thru is|Y
01|208369|4|2|not necessary please use B30-6000-EU and save costs on|Y
01|208369|4|3|pull stud.|Y
01|208374|2|1|Lyndex-Nikken to make position block upon receipt|Y
01|208374|2|2|of spindle drawing confirmation|Y
01|208374|2|3|Quoted at Net price.|Y
01|208375|2|1|to hold 17/64|Y
01|208375|3|1|to hold 13/32|Y
01|208375|4|1|to hold 9/32|Y
01|208375|5|1|to hold 5/32|Y
01|208375|6|1|to hold 17/32|Y
01|208375|8|1|to hold 11/32|Y
01|208375|9|1|to hold 11/64|Y
01|208375|11|1|to hold 9/64|Y
01|208383|8|1|Final Part# H10ARAM-ER25-225STEC-110TP|Y
01|208383|8|2|HSK100A AngleHead ER25 SLIM ExtCool 110mmPitch TaperPin|Y
01|208386|2|1|Includes Haas Motors and Cables.|Y
01|208387|7|1|NOTE: Brake Parameter and Center Height need to be|Y
01|208387|7|2|adjusted. Add Silencer.|Y
01|208387|8|1|NOTE: Brake Parameter and Center Height need to be|Y
01|208387|8|2|adjusted. Add Silencer.|Y
01|208387|14|1|PLC#: CJ|Y
01|208387|14|2|Price after 3/31/23: $13662.00/EA|Y
01|208387|18|1|PLC-MCE0618K-FORM-2AX-001 (NX)|Y
01|208387|18|2|PLC#: NX  Control 2 tables(Axis) with 1 PLC unit.|Y
01|208387|18|3|Delivery: 3months Mfg. + 2weeks development|Y
01|208387|19|1|PLC Engineering/Development Cost|Y
01|208396|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|208396|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|208396|3|1|Req.INS/Install E11-NUT & ER11-SCREW(C)|Y
01|208396|4|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|208396|5|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|208396|6|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|208396|7|1|Req.INS/Install S7/16-20X3/8|Y
01|208396|8|1|Req.INS/Install S5/8-18X1/2|Y
01|208396|9|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|208396|10|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|208396|11|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|208396|12|1|Req.INS/Install E32-NUT|Y
01|208396|13|1|Req.INS/Install SKN-6WK|Y
01|208396|14|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|208396|15|1|1st Batch/Stock|Y
01|208396|16|1|1st Batch|Y
01|208396|17|1|Req.INS/Install E32-NUT-G & ER32-SCREW(C)|Y
01|208403|2|1|Includes: Drive unit short bar fiber optic cable|Y
01|208403|2|2|bulkhead cablesexternal cables parameter changes|Y
01|208403|2|3|service time and travel.|Y
01|208406|6|1|ALTERNATIVE TO H40E-SF0375-3.15|Y
01|208413|3|1|SCALE FOR TILT AXIS|Y
01|208413|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|208413|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|208413|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|208413|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|208422|1|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|208433|4|1|NOT AVAILABLE IN COOLANT SEALED|Y
01|208433|5|1|NOT AVAILABLE IN COOLANT SEALED|Y
01|208451|2|1|Fall promo|Y
01|208453|1|1|LABOR COST TO CONVERT CNCZ180LSA-BR2 -> YA-BR SPEC|Y
01|208453|16|1|Switch box|Y
01|208467|2|1|Includes: New bulkhead cables external cables|Y
01|208467|2|2|parameter changes service time and travel.|Y
01|208467|2|3|Installation to take appox 1-2 days|Y
01|208469|1|1|Table to be CEDM Gray|Y
01|208474|1|1|Includes: CT200R030 200mm T-Slotted Faceplate|Y
01|208474|1|2|Installation with Amp Cables Hardware Parameter|Y
01|208474|1|3|changes travel & labor.|Y
01|208477|1|1|RGA#TOR-60318/|Y
01|208477|1|2|Repair of S20-UMT|Y
01|208477|3|1|Calibration service included.|Y
01|208482|3|1|Item#1 only|Y
01|208485|1|1|*OVERSTOCK promotion additional 20% discount|Y
01|208485|1|2|Final Sale|Y
01|208492|1|1|The promotion 20% extra discount has been added to|Y
01|208492|1|2|this part number>> Overstock|Y
01|208493|1|1|Nikken CKFN32T-20C|Y
01|208495|8|1|Please Note: I have added the extra 10% to the discount|Y
01|208495|8|2|for the Live Tool promotion we are offering to Butler.|Y
01|208495|8|3|If quantities should change please re-submit for|Y
01|208495|8|4|new quote. This promo is good until March 312024.|Y
01|208499|1|1|New part# B5006-0750-3.00DIN-M|Y
01|208499|1|2|BT50 3/4 End Mill Holder w/ 3 Gage length|Y
01|208499|1|3|Modified DIN Coolant Thru Flange|Y
01|208499|1|4|*cannot be cancelled or returned|Y
01|208499|1|5|*NET Price|Y
01|208501|1|1|part# TBD|Y
01|208501|1|2|Shank for BMT- Style turret with D = 55mm|Y
01|208501|1|3|tooling interface for collet system|Y
01|208501|1|4|ER 32 (1.0-20mm) according DIN 6499|Y
01|208501|1|5|coolant supply external through pipes|Y
01|208501|1|6|L1 = 125 mm  / gear ratio 1:1|Y
01|208501|1|7|Max Torque = 40 Nm|Y
01|208501|1|8|max. revolution n1(max) = 6.500 r.p.m.|Y
01|208501|1|9|n2(max) = 6.500 r.p.m.J837|Y
01|208501|1|10|*1-2pc $5560.00ea/net  // *3pc+ $5132.00ea/net|Y
01|208501|3|1|part# TBD|Y
01|208501|3|2|Shank for BMT-turret with D=55 / S1=104|Y
01|208501|3|3|Drive Twoflat AF 8mm|Y
01|208501|3|4|tooling interface for collet system|Y
01|208501|3|5|ER25 (0.5-16.0mm) according DIN 6499- extrernal coolant|Y
01|208501|3|6|no reversal of rotation (Drive dir = Output dir_)|Y
01|208501|3|7|L= 80mm / Gear ratio 1:1|Y
01|208501|3|8|max. torque: M(max)=40 Nm|Y
01|208501|3|9|Max ingoing rev:n1(max)= 6500rpm/Max OUT Rev:n2 6500rpm|Y
01|208501|3|10|*1-2pc $6097.00ea/net  // *3pc+ $5630.00ea/net|Y
01|208550|7|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|208555|1|1|Includes cables|Y
01|208555|4|1|$2000.00 Free Tooling Certificate Fall Promo|Y
01|208565|1|1|1 in stock in IL additional pieces 2-3 wks from Japan|Y
01|208581|1|1|Final P/N TBD C6-BLANK-85|Y
01|208581|1|2|(thb.ps063.002)  D=110 mm; L=85 mm|Y
01|208581|1|3|Qty 10 - $469.00ea/net|Y
01|208581|1|4|Qty 20 - $427.00ea/net|Y
01|208581|1|5|Qty 50 - $364.00ea/net|Y
01|208581|1|6|Qty 100- $305.00ea/net|Y
01|208581|1|7|**Qty Break/ Net Pricing**|Y
01|208581|1|8|**Min. Required 10pcs|Y
01|208597|1|1|H63F-SF0750-3.15?|Y
01|208597|1|2|HSK63F Shrink Fit Holder 3/4 25K|Y
01|208597|4|1|H63F-SF0500-2.95?|Y
01|208597|4|2|HSK63F Shrink Fit Holder 1/2 25K|Y
01|208597|6|1|h63f-sf0500-6.00?|Y
01|208597|6|2|HSK63F Shrink Fit Holder 1/2 25K|Y
01|208618|1|1|P/N: HSK63A-SM0750-4.00CP|Y
01|208620|1|1|TAR-60277|Y
01|208620|1|2|5AX-201YA sn: 3651|Y
01|208634|1|1|1st Batch/967234 Techni-Tool/Wildman Mfg|Y
01|208634|2|1|1st Batch/960345 MSC/Lock Perf. 10/11:DWG Confirmed/TR|Y
01|208650|3|1|Includes: EZ-TEND 4-sided tower with 6 shelves per side|Y
01|208650|3|2|HMI for Fanuc CRX20 with assigned CNC program to|Y
01|208650|3|3|pallet. 2-Area safety scanners. No fence included|Y
01|208650|4|1|Fanuc CRX20IAL with 1418MM reach 20kg payload|Y
01|208650|4|2|Inlcudes all required add ons.|Y
01|208650|5|1|Installation of system.|Y
01|208662|1|1|Estimate cost for repair service|Y
01|208662|1|2|CNCZ180LSA-BR2 X 2 - getting position shift issues|Y
01|208662|1|3|Parts + Labor + travel fees|Y
01|208662|2|1|Travel Time|Y
01|208662|3|1|Actaul Labor time at the customer|Y
01|208662|4|1|Gas/Hotel/Meals expenses|Y
01|208675|1|1|#140066|Y
01|208675|1|2|CAT50.complete with Torque-Arm and locking machanism|Y
01|208675|1|3|machine specific adjusted(without machine specific|Y
01|208675|1|4|stopblock)tooling interface for mi50 Quick Change|Y
01|208675|1|5|System (mi-insert must be ordered separately)|Y
01|208675|1|6|- no coolant supplyL=206 mmgear ratio: 1(n1/n2)=1:1|Y
01|208675|1|7|max.torque M(max)=50Nmmax.revolution n1(max)=5.000rpm|Y
01|208675|1|8|n2(max) = 5.000 r.p.m.- MIAMTIC drawing no. 00062814|Y
01|208675|2|1|#140066 MI50 1.250 Adaptor Grinding Wheel|Y
01|208675|2|2|Adaptor will be produced to the required specifications|Y
01|208675|2|3|provided from Delta|Y
01|208679|114|1|NET PRICE|Y
01|208679|114|2|Studs are only available at this price if package is|Y
01|208679|114|3|purchased!|Y
01|208685|3|1|Free $2500.00 Lyndex-Nikken Tooling Certificate|Y
01|208700|12|1|SPECIAL - NON-CANCELABLE & NON-RETURNABLE|Y
01|208703|1|1|1pc in Stock in IL add'l pieces ETA week of 2/26/24|Y
01|208709|2|1|Comment for SK16-1/8A Line2|Y
01|208714|1|1|**Please note that this Live Tool was used at a|Y
01|208714|1|2|Machine Dealers Open House. This has been inspected|Y
01|208714|1|3|loading works fine and rotates smoothly. There is|Y
01|208714|1|4|minor wear on drive tang and dings on corner housing.|Y
01|208714|1|5|We will honor a 6 month warranty.|Y
01|208725|3|1|SCALE FOR TILT AXIS|Y
01|208725|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|208725|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|208725|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|208725|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|208725|7|1|CUSTOM ADAPTER PLATE FOR 5AX-201 FOR GE FIXTURE|Y
01|208725|7|2|** WILL NEED TO DISCUSS SOME FEATURES ON DRAWING ONCE|Y
01|208725|7|3|PO IS ISSUED ***|Y
01|208730|20|1|OPTION #1 Drawing Included|Y
01|208730|21|1|OPTION #2 Drawing Included|Y
01|208741|11|1|NON-CANCELABLE/NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|208741|66|1|Serinex# D12.150.CL4|Y
01|208741|66|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|208741|66|3|NON-CANCELABLE/NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|208741|78|1|SERINEX # D25.150.CL8|Y
01|208741|78|2|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|208741|78|3|NON-CANCELABLE/NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|208741|97|1|HSK100A-FMH27-60-90|Y
01|208741|97|2|NON-CANCELABLE/NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|208741|105|1|SERINEX # HSK.A.100.160.D40S|Y
01|208742|13|1|Please Note: We currently have 4 in stock and if they|Y
01|208742|13|2|need more delivery is 14~15 weeks.|Y
01|208743|1|1|1st Batch/For stock 11/1:DWG APRVED(BenT)|Y
01|208743|1|2|Birla BOAT#232470186|Y
01|208758|1|1|HSK63F 3/4 Shell mill Please order # HSK63F-SM0750-1.75|Y
01|208758|1|2|Cross to Command Part # H4S3-F0750|Y
01|208758|1|3|This item is special once ordered cannot be cancelled|Y
01|208758|1|4|or returned. Delivery is after drawing as been approved|Y
01|208758|1|5|Net price has been quoted no further discount offered.|Y
01|208764|1|1|ref s./n.16007NT|Y
01|208764|1|2|special RT w/o Groove|Y
01|208764|6|1|special w/o Groove|Y
01|208787|1|1|Discount reflests test tool and is non returnable if|Y
01|208787|1|2|put into the spindle.|Y
01|208788|1|1|This item is not returnable.|Y
01|208793|1|1|Part Number to be Determined>>CAPTO C4 OD TOOLING BLOCK|Y
01|208793|1|2|Sandvik #C4-TRE-NA55A|Y
01|208794|1|1|135mm Centerheight and Motor mounted on RH side of RT.|Y
01|208794|2|1|105mm Centerheight|Y
01|208798|2|1|Pricing for Special extended drawtube adapter to be|Y
01|208798|2|2|used with the QCC-ADAPTER-A6-A6.|Y
01|208805|1|1|Overstock Promo! Extra 20% off but this item is not|Y
01|208805|1|2|returnable!|Y
01|208815|1|1|Includes Haas motors and cable sets.|Y
01|208818|1|1|P/N: TBD  203785|Y
01|208818|1|2|Angular swiveling version adjustable +-107 degrees|Y
01|208818|1|3|BMT45 ER16 1:1 ratio external coolant|Y
01|208822|1|1|Delivery: There are 2 at Nikken Japan 1~2 weeks|N
01|208822|1|2|delivery. 2-pcs 13 Weeks upon receipt of order.|N
01|208827|4|1|Can make shorter cables|Y
01|208827|5|1|Can make shorter cables|Y
01|208827|6|1|Can make longer cables|Y
01|208827|7|1|Can make longer cables|Y
01|208828|5|1|POSITIONING BLOCKS FOR MAKINO A81 MACHINES|Y
01|208835|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|208835|6|1|HAAS MACHINE WILL NEED:|Y
01|208835|6|2|4TH AXIS DRIVE & 3RD PARTY ROTARY TABLE SOFTWARE|Y
01|208835|6|3|ONCE THESE ITEMS ARE INSTALLED WE CAN COME IN|Y
01|208835|6|4|TO PERFORM THE INSTALLATION. OUR INSTALLATION COST|Y
01|208835|6|5|INCLUDES: LABOR + TRAVEL EXPENSES WIRING FROM|Y
01|208835|6|6|ELECTRICAL CABINET TO BULKHEAD BULKHEAD CONNECTORS|Y
01|208835|6|7|AND PARAMETER MODIFICATIONS.|Y
01|208840|1|1|RGA#TAR-60314|Y
01|208840|1|2|5AX-130YA-M  SN:5880|Y
01|208845|1|1|INCLUDES AIR/HYDRAULIC BOOSTER FOR BRAKE|Y
01|208845|3|1|PVC COATED EXTERNAL POWER/FEEDBACK CABLES FOR|Y
01|208845|3|2|4TH AXIS ON OKUMA MILLAC 3.5M LONG|Y
01|208845|4|1|16 3-JAW SCROLL CHUCK AND ADAPTER PLATE|Y
01|208845|4|2|ALSO INCLUDES MOUNTING HARDWARE FOR CNC501|Y
01|208855|2|1|Includes removable T-slot face plate|Y
01|208872|1|1|Qty Break NET Pricing:|Y
01|208872|1|2|1-10pc  $515ea/net|Y
01|208872|1|3|11-30pc $468ea/net|Y
01|208872|1|4|31+pc   $432ea/net|Y
01|208872|1|5|***Special pricing- hyd ck cannot be cancelled***|Y
01|208875|2|1|CNC180 Full Over Haul Cost  $10250 (SP DEAL)|Y
01|208875|2|2|Including Basic Repair Brake Parts Repair and|Y
01|208875|2|3|Worm Wheel/Screw Repair. (STD COST: $13375)|Y
01|208875|7|1|Including Motor/Cover/Cables/Labor|Y
01|208876|2|1|CNC260 Full Over Haul Cost $12950(SP DEAL)|Y
01|208876|2|2|Including Basic Repair Brake Parts Repair and|Y
01|208876|2|3|Worm Wheel/Screw Repair. (STD Cost: $14590)|Y
01|208876|9|1|Including Motor/Gearbox/Cables/Labor|Y
01|208882|1|1|For a 1 Shell Mill Holder|Y
01|208882|2|1|For a 3/4 Shell Mill Holder|Y
01|208889|2|1|*****Free $3000 Lyndex Nikken Tooling Certificate*****|Y
01|208889|2|2|End User will receive a free $3K tooling certificate|Y
01|208889|2|3|with purchase of above rotary table.  Certificate is|Y
01|208889|2|4|redeemable directly with Lyndex Nikken for list price|Y
01|208889|2|5|value products.  Please call Chris Blaine 260-570-5059|Y
01|208889|2|6|with any questions or concerns.|Y
01|208908|14|1|Order part # C4007-0020-4.00-IDI|Y
01|208908|14|2|CAT40 ER20 Collet Chuck HiTorque BearingNut ChipHole|Y
01|208908|14|3|With BIS-C-122-04/L installed and holder rebalanced.|Y
01|208908|15|1|Order part # C4007-0032-3.13-IDI|Y
01|208908|15|2|CAT40 ER32 Collet Chuck HiTorque BearingNut ChipHole|Y
01|208908|15|3|With BIS-C-122-04/L installed and holder rebalanced.|Y
01|208908|16|1|Order part # C4007-0032-5.00-IDI|Y
01|208908|16|2|CAT40 ER32 Collet Chuck HiTorque BearingNut ChipHole|Y
01|208908|16|3|With BIS-C-122-04/L installed and holder rebalanced.|Y
01|208908|17|1|Order part # C4007-0040-3.13-IDI|Y
01|208908|17|2|CAT40 ER40 Collet Chuck HiTorque BearingNut ChipHole 25|Y
01|208908|17|3|With BIS-C-122-04/L installed and holder rebalanced.|Y
01|208908|18|1|Order Part # C4007-0020-6.00-IDI|Y
01|208908|18|2|CAT40 ER20 Collet Chuck HiTorque BearingNut ChipHole|Y
01|208908|18|3|With BIS-C-122-04/L installed and holder rebalanced.|Y
01|208908|19|1|Order part # C4006-1250-4.00-IDI|Y
01|208908|19|2|CAT40 End Mill Holder 1.1/4 25K|Y
01|208908|19|3|With BIS-C-122-04/L installed and holder rebalanced.|Y
01|208911|1|1|NEW P/N: W7505-0562-4.33|Y
01|208911|1|2|3/4 Weldon Shank Extension Tension/Compression Tap|Y
01|208911|1|3|holder with 4.33 gauge length OAL 6.36|Y
01|208919|1|1|Calibration service for E578M s/n:1784|Y
01|208919|1|2|This is a time based estimate.|Y
01|208919|1|3|Any parts that would be required would be additional.|Y
01|208930|1|1|NCAT40 SK20 Major Dream like the NCAT40N-MDSK20-75U but|Y
01|208930|1|2|long enough to not have an ATC issue. whatever that|Y
01|208930|1|3|length is.|Y
01|208931|1|1|Delivery as of 12/29 2-pc 1~2 weeks / Balance 4.5 month|Y
01|208948|1|1|1st Batch|Y
01|208956|2|1|Quoted at Net Price.|Y
01|208958|1|1|Delivery is 3-4 weeks after approved drawing received.|Y
01|208958|1|2|Please allow additional time for drawing process.|Y
01|208984|1|1|add coolant ports.|Y
01|208984|3|1|Part # HSK160B-ER40-6.00|Y
01|208984|5|1|H100A-SF10000-4.00CP|Y
01|208984|6|1|H100A-SF0750-4.00CP|Y
01|208984|7|1|H100A-SF0750-6.00CP|Y
01|208984|8|1|H125A-SF1000-5.00CP|Y
01|208984|9|1|H125A-SF0750-4.00CP|Y
01|208995|3|1|Quoted at NET Price.|Y
01|208997|5|1|This Nakamura tool is extra 20% under OVERSTOCK PROMO|Y
01|208997|5|2|FINAL SALE|Y
01|209009|5|1|This Nakamura tool is extra 20% under OVERSTOCK PROMO|Y
01|209009|5|2|FINAL SALE|Y
01|209020|3|1|SPECIAL - NON-CANCELABLE/NON-RETURNABLE|Y
01|209020|4|1|SPECIAL - NON-CANCELABLE/NON-RETURNABLE|Y
01|209020|5|1|SPECIAL - NON-CANCELABLE/NON-RETURNABLE|Y
01|209020|6|1|SPECIAL - NON-CANCELABLE/NON-RETURNABLE|Y
01|209020|7|1|SPECIAL - NON-CANCELABLE/NON-RETURNABLE|Y
01|209020|8|1|SPECIAL - NON-CANCELABLE/NON-RETURNABLE|Y
01|209028|9|1|POSITIONING BLOCK FOR CAT40 HAAS MACHINE|Y
01|209029|3|1|Delivery on rotary tables will be around 4-6 weeks|Y
01|209029|3|2|for Lyndex-Nikken to get conversion parts to Hurco Spec|Y
01|209029|3|3|Will need to get wiring information as well as motor|Y
01|209029|3|4|information to make sure we can mount it to the gearbox|Y
01|209030|6|1|Stock Alt for SE1-3.0X2.5|Y
01|209032|46|1|Modification of table with Mitsubishi motors|Y
01|209032|46|2|for Kitamura 4xiD|Y
01|209032|46|3|New: Motors/internal cables/motor gear/motor covers|Y
01|209032|46|4|Delivery: 6 weeks for parts|Y
01|209032|47|1|Installation charge to 5AX-201MA-M-AB|Y
01|209032|47|2|Amplifiers/Hardware/Time/Travel/Expenses|Y
01|209036|5|1|This item cannot be cancelled or returned.|Y
01|209047|8|1|Replaces C40S5-0562-2.93|Y
01|209047|9|1|Replaces C40R5-0562-3.02|Y
01|209049|7|1|A tariff surcharge may be added to this quotation in|Y
01|209049|7|2|the event of a sustained tariff increase on the|Y
01|209049|7|3|importation of this product.  Any surcharge will be|Y
01|209049|7|4|disclosed prior to acceptance of an order.|Y
01|209051|13|1|Please Note: We currently have 4 in stock and if they|Y
01|209051|13|2|need more delivery is 14~15 weeks.|Y
01|209052|1|1|BMT65 LIVE ER20 TWIN OUTPUT CENTRAL OFFSET A =43mm;|Y
01|209052|1|2|INT/EXT COOLANT / ICE; REVERSAL ROTATION;|Y
01|209052|1|3|1:2 GEAR MAX 5Nm/SPINDLE;MAX IN 5K RPM MAX OUT 10K RPM;|Y
01|209052|1|4|REF DRWG # 00056508;|Y
01|209052|1|5|Quoted for 1 tool.|Y
01|209060|1|1|1st Batch 7/10:DWG Approved/TR|Y
01|209060|2|1|1st Batch 7/10:DWG Approved/TR|Y
01|209060|3|1|Req.INS/T/P Inspection Required|Y
01|209060|4|1|Req.INS/T/P Inspection Required|Y
01|209060|5|1|Req.INS/T/P Inspection Required|Y
01|209060|6|1|Req.INS/T/P Inspection Required|Y
01|209063|18|1|SPECIAL ORDER NON-CANCELABLE/NON-RETURNABLE AFTER|Y
01|209063|18|2|RECEIPT OF PO|Y
01|209064|21|1|Special- cannot be cancelled or returned|Y
01|209072|1|1|1st Batch/Stock|Y
01|209072|2|1|1st Batch/Stock|Y
01|209072|3|1|1st Batch/Stock|Y
01|209072|4|1|1st Batch/Stock|Y
01|209072|5|1|1st Batch/CBO&STOCK|Y
01|209075|2|1|A tariff surcharge may be added to this quotation in|Y
01|209075|2|2|the event of a sustained tariff increase on the|Y
01|209075|2|3|importation of this product.  Any surcharge will be|Y
01|209075|2|4|disclosed prior to acceptance of an order.|Y
01|209080|3|1|The above holder is non-returnable & non-cancelable|Y
01|209080|4|1|The above holder is non-returnable & non-cancelable|Y
01|209080|5|1|The above holder is non-returnable & non-cancelable|Y
01|209081|1|1|match with SN#25532T|Y
01|209081|1|2|includes the following accessories|Y
01|209081|1|3|TCD-21193 (6+1PRJ)|Y
01|209081|1|4|TCE-A7026 (power signal cable)|Y
01|209081|1|5|TCE-94808 (feeg back cable)|Y
01|209081|3|1|TAT-170N|Y
01|209081|3|2|includes the following accessories|Y
01|209081|3|3|TCD-37235 (6+1PRJ)|Y
01|209082|3|1|Year end Promo free chuck with purchase of Rotary table|Y
01|209082|4|1|Includes drive unitexternal cables perameter changes|Y
01|209082|4|2|service time and travel|Y
01|209082|7|1|Includes 320mm Indexer w/ AR21 controllerpendent|Y
01|209082|7|2|External cable power cable and Mcode cable|Y
01|209082|7|3|*does not include Mcode connection*|Y
01|209095|2|1|*Year end Promo Free Chuck w/purchase of Rotary table*|Y
01|209095|4|1|Includes drive unit  external cablesParameter changes|Y
01|209095|4|2|service time and TRavel|Y
01|209095|5|1|*Free 1 year PM visit*|Y
01|209097|3|1|Overstock Promotion discount of 20% has been added|Y
01|209097|3|2|to this items.|Y
01|209099|1|1|once ordered this cannot be returned.|Y
01|209105|2|1|4 HOURS FOR INSTALLATION OF AIR/HYDRAULIC BOOSTER|Y
01|209105|2|2|INTO CNCZ260 ROTARY TABLE FOR H&H TOOL.|Y
01|209106|1|1|RGA#TOR-60373/|Y
01|209106|1|2|Repair of PF-2|Y
01|209106|2|1|Calibration service included.|Y
01|209109|15|1|**Note: This would use existing cables and Fanuc Amp|Y
01|209109|15|2|but these items would not be under Warranty as with the|Y
01|209109|15|3|full Installation Quoted above.|Y
01|209112|1|1|This item is considered non-standard stock.|N
01|209112|1|2|It cannot be returned/cancelled once order is placed|N
01|209124|1|1|Long 5C collet nose Bolt for old style 5C thread nose|Y
01|209141|1|1|This item is considered speical once ordered it cannot|Y
01|209141|1|2|be cancelled or returned.|Y
01|209141|3|1|This item is considered speical once ordered it cannot|Y
01|209141|3|2|be cancelled or returned.|Y
01|209163|7|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|209164|1|1|Balance of 2 pcs ETA 10-11 Weeks|Y
01|209166|1|1|RGA#LVR-60376/|Y
01|209166|1|2|Repair of OKU-L470-Z s/n:AL0074 (Alps#OK102-17000)|Y
01|209166|2|1|Bearings o-rings collet nut and spindle to be|Y
01|209166|2|2|replaced.|Y
01|209203|1|1|old model# OKU-L470-Z|Y
01|209205|1|1|Part # C6-SM32-25|Y
01|209205|1|2|c6 32mm shell mill stubby|Y
01|209205|1|3|This item is considered special. Once ordered cannot|Y
01|209205|1|4|be cancelled or returned.|Y
01|209205|3|1|C6-FMH31.75-96-60   -C6 31.75 face mill holder|Y
01|209205|3|2|This item is considered special. Once ordered cannot|Y
01|209205|3|3|be cancelled or returned.|Y
01|209205|5|1|Part # HSK63A-SM32-150 HSK63A 32mm shell mill 150mm GL|Y
01|209205|5|2|This item is considered special. Once ordered cannot|Y
01|209205|5|3|be cancelled or returned.|Y
01|209205|6|1|Part # HSK63A-SM32-200 HSK63A 32mm shell mill 200mm GL|Y
01|209205|6|2|This item is considered special. Once ordered cannot|Y
01|209205|6|3|be cancelled or returned.|Y
01|209213|1|1|Table only motors not included.|Y
01|209214|1|1|SPECIAL ORDER|Y
01|209214|1|2|NON-CANCELABLE/NON-RETURNABLE AFTER RECEIPT OF PO|Y
01|209228|1|1|Replacement Table without Motor these are discontinued|Y
01|209228|1|2|Discontinued part max discount 35% no tool cert|Y
01|209236|1|1|HSK40E-C12-80G|Y
01|209256|1|1|This item cannot be cancelled or returned.|Y
01|209267|1|1|Includes built in 6-port rotary unions.|Y
01|209279|1|1|NET PRICING QUOTED NO FURTHER DISCOUNTS|Y
01|209279|1|2|Special order non-cancelable/non-returnable|Y
01|209282|1|1|P/N: C4007-0011-4.00 with E11-NUT-MINI|Y
01|209282|1|2|CAT40 taper ER11-collet chuck w 4.00 gauge length|Y
01|209282|1|3|slim line/ Mini crown nut M19X1|Y
01|209282|19|1|P/N: C4007-0016-4.00 with E11-NUT-MINI|Y
01|209282|19|2|CAT40 taper ER16 collet chuck w 4.00 gauge length|Y
01|209282|19|3|slim line mini crown nut M19x1|Y
01|209283|10|1|Tony Malloy will do the install himself at no charge.|Y
01|209289|2|1|This tool is on our overstock list and I have added|Y
01|209289|2|2|the extra 20% to the discount.|Y
01|209297|1|1|All Sales are final!|Y
01|209300|2|1|Lyndex-Nikken will have customer's existing:|Y
01|209300|2|2|H10ARAM-ER25-225ST-110TP units|Y
01|209300|2|3|converted to External Coolant|Y
01|209300|2|4|RGA for modification is required.|Y
01|209300|2|5|Delivery is 4-5weeks from receipt of customer's units|Y
01|209300|2|6|and receipt of PO.|Y
01|209300|2|7|These units have been modified. These cannot be|Y
01|209300|2|8|cancelled or returned.|Y
01|209300|2|9|Approval drawing will be required for modification.|Y
01|209300|2|10|Heads will have H10ARAM-ER25-225STEC-110TP ID tag added|Y
01|209300|4|1|Lyndex-Nikken will have customer's existing:|Y
01|209300|4|2|H10ARAM-ER32-210OT-110TP units|Y
01|209300|4|3|converted to Internal Coolant.|Y
01|209300|4|4|RGA required for modification.|Y
01|209300|4|5|Delivery is 4-5weeks from receipt of customer's units|Y
01|209300|4|6|and receipt of PO.|Y
01|209300|4|7|These units have been modified. These cannot be|Y
01|209300|4|8|cancelled or returned.|Y
01|209300|4|9|Approval drawing will be required for modification.|Y
01|209300|4|10|Heads will have H10ARAM-ER32-210OTIC-110TP ID tag added|Y
01|209308|1|1|Part# to be determined >> Straight Shank Shrink Fit|Y
01|209308|1|2|Tool per Triumph Tool Drawing SDT240105|Y
01|209378|1|1|This item is not returnable.|Y
01|209384|1|1|Quoted at NET price.|Y
01|209386|1|1|RGA#LVR-60333/|Y
01|209386|1|2|Repair of MZQT5-ER40X-OFF-ICE s/n:22906629 03|Y
01|209386|1|3|(Mimatic#189956)|Y
01|209386|2|1|Bearings seals and o-rings to be replaced.|Y
01|209400|1|1|There are part of our OS promo and are non-cancellable|Y
01|209400|1|2|and non-returnable once a PO has been placed|Y
01|209406|1|1|This item is Special once ordered cannot be cancelled|Y
01|209406|1|2|or returned.|Y
01|209422|1|1|Net price includes the following parts for assembly|Y
01|209422|1|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|209422|1|3|customer's supplied RFID chip and holder re-balanced.|Y
01|209434|2|1|HSK50A-TB40-200|Y
01|209434|2|2|HSK50A Test Bar 40-200mm|Y
01|209436|1|1|RGA#LVR-60341/|Y
01|209436|1|2|Repair of C50RAM-MI50-180-110TP s/n:97928 02|Y
01|209436|1|3|(Mimatic#192351)|Y
01|209436|2|1|Bearings seals and o-rings to be replaced.|Y
01|209449|1|1|ATRUMP AL52 Machine|Y
01|209456|8|1|This is an install kit and only contains needed install|Y
01|209456|8|2|hardware components. Meredith Machinery would be|Y
01|209456|8|3|responsible for performing the physical installation of|Y
01|209456|8|4|all components.|Y
01|209457|1|1|Includes Haas Motor and Cables.|Y
01|209457|2|1|Includes Haas Motor and Cables.|Y
01|209457|3|1|*Required for Hydraulic Braking Rotary Tables above.|Y
01|209467|1|1|HSK63A-MDSK10-135|Y
01|209467|1|2|HSK63A Major Dream Slim Chuck SK10 15K|Y
01|209467|1|3|SPECIAL ORDER - NON-CANCELABLE/NON-RETURNABLE AFTER|Y
01|209467|1|4|RECEIPT OF PO|Y
01|209467|2|1|HSK63A-MDSK13-135|Y
01|209467|2|2|HSK63A Major Dream Slim Chuck SK13 15K|Y
01|209467|2|3|SPECIAL ORDER - NON-CANCELABLE/NON-RETURNABLE AFTER|Y
01|209467|2|4|RECIPT OF PO|Y
01|209470|1|1|Estimate cost for repair service|Y
01|209470|1|2|CNCZ180LSA-BR2 X 2 - getting position shift issues|Y
01|209470|1|3|Parts + Labor + travel fees|Y
01|209470|2|1|Travel Time|Y
01|209470|3|1|Actaul Labor time at the customer|Y
01|209470|4|1|Gas/Hotel/Meals expenses|Y
01|209471|2|1|A tariff surcharge may be added to this quotation in|Y
01|209471|2|2|the event of a sustained tariff increase on the|Y
01|209471|2|3|importation of this product.  Any surcharge will be|Y
01|209471|2|4|disclosed prior to acceptance of an order.|Y
01|209472|3|1|grey bond for sealing|Y
01|209480|1|1|Req.INS/Install E11-NUT & ER11-SCRW(C)|Y
01|209480|2|1|Req.INS/Install E16-NUT & ER16-SCRW(C)|Y
01|209480|3|1|Req.INS*Install E32-NUT & ER32-SCREW(C)|Y
01|209480|4|1|1st Batch/(1)968129 Machinery Tool/GAM Ent.|Y
01|209480|5|1|1st Batch/(12)967133 SP Mfg./Swiss Precision Mfg.|Y
01|209484|1|1|Special price for showroom table|Y
01|209490|1|1|Tool Cert 2214|Y
01|209498|1|1|SPECIAL ORDER NON_CANCELABLE/NON-RETURNABLE|Y
01|209498|1|2|ETA is after REQUIRED DRAWING APPROVAL|Y
01|209501|3|1|This item cannot be returned.|Y
01|209511|1|1|RGA#LVR-60364/|Y
01|209511|1|2|Repair of MNL12-SK20X-ICE-10K s/n:18900510 14|Y
01|209511|1|3|(Mimatic#184649)|Y
01|209511|2|1|Bearings seals and o-rings to be replaced.|Y
01|209520|1|1|RGA#CUR-60325/|Y
01|209520|1|2|Repair of C50RAM-MI50-180-110TP s/n:63640 01|Y
01|209520|1|3|(Mimatic#178152)|Y
01|209520|2|1|Disassembled flange assembly and drilled out bolts and|Y
01|209520|2|2|replaced bolts and reassembled.|Y
01|209522|3|1|Installation includes: Bulkhead cables external cables|Y
01|209522|3|2|parameter changes service time and travel.|Y
01|209528|1|1|This item is considered a Special. Once a PO is placed|Y
01|209528|1|2|with factory it may not be cancelled or returned.|Y
01|209528|1|3|ETA approx 3-4 weeks after receipt of PO.|Y
01|209529|5|1|50 TAPER TO VDI25 ADAPTER|Y
01|209529|8|1|INCLUDES 8 HOURS TOTAL FOR INSTALLATION & TRAINING|Y
01|209530|1|1|THE DISCOUNT GIVEN IS FOR A DEMO UNIT.  THE|Y
01|209530|1|2|WARRANTY WILL BE 1 YEAR.  THE SAME AS A NEW UNIT|Y
01|209530|1|3|ONCE THIS UNIT IS SOLD THE DISCOUNT FOR A NEW UNIT|Y
01|209530|1|4|WILL BE 30%.|Y
01|209530|5|1|50 TAPER TO VDI25 ADAPTER|Y
01|209530|8|1|EIGHT HOURS TOTAL FOR BOTH INSTALLATION & TRAINING|Y
01|209532|5|1|This is is a complete special once ordered it cannot|Y
01|209532|5|2|be cancelled or returned. Net price has been quoted|Y
01|209532|5|3|no further discount should be taken. ETA 4-5 Weeks|Y
01|209532|5|4|after signed drawing has been received from the enduser|Y
01|209532|5|5|MOQ = 10 pcs|Y
01|209539|1|1|The chamfer width of the Groove is larger than good one|Y
01|209540|1|1|FLASH SALE- week 1/8-1/12|Y
01|209541|1|1|The chamfer width of the Groove is larger than good one|Y
01|209542|1|1|The chamfer width of the Groove is larger than good one|Y
01|209543|8|1|*Lyndex-Nikken to make position block|Y
01|209547|3|1|Manifold Assembly for above pancake cylinder|Y
01|209549|3|1|HSK63A-SK16-80-J|Y
01|209549|14|1|HSK63A-SK10C-90-J|Y
01|209558|1|1|HSK63F 3/4 Shell mill stubby with 2 GL|Y
01|209558|1|2|Part # HSK63F-SM0750-2.00|Y
01|209558|1|3|This is a complete special once ordered it cannot be|Y
01|209558|1|4|cancelled or returned.|Y
01|209558|2|1|HSK63F 1 Shell mill stubby with 2 GL|Y
01|209558|2|2|Part # HSK63F-SM1000-2.00|Y
01|209558|2|3|These are also special cannot be cancelled or returned|Y
01|209572|1|1|add coolant ports.|Y
01|209572|3|1|Part # HSK160B-ER40-6.00|Y
01|209572|5|1|H100A-SF10000-4.00CP|Y
01|209572|5|2|10 pc price = $278 net each.|Y
01|209572|6|1|H100A-SF0750-4.00CP|Y
01|209572|6|2|10 pc price = $278 net each|Y
01|209572|7|1|H100A-SF0750-6.00CP|Y
01|209572|7|2|10 pc price = $342 net each|Y
01|209572|8|1|H125A-SF1000-5.00CP|Y
01|209572|8|2|10 pc price = $772 net each|Y
01|209572|9|1|H125A-SF0750-4.00CP|Y
01|209572|9|2|10 pc price = $697 net each|Y
01|209581|1|1|This item is special once ordered it cannot be|Y
01|209581|1|2|cancelled or returned|Y
01|209602|1|1|BOAT #01102401-B: No INS Req'd.|Y
01|209602|2|1|BOAT #01102401-B: No INS Req'd.|Y
01|209602|3|1|BOAT #01102401-B: No INS Req'd.|Y
01|209602|4|1|BOAT #01102401-B: No INS Req'd.|Y
01|209602|5|1|BOAT #01102401-B: No INS Req'd.|Y
01|209602|6|1|BOAT #01102401-B: No INS Req'd.|Y
01|209602|7|1|BOAT #01102401-B: No INS Req'd.|Y
01|209603|1|1|Req.INS/Install E11-NUT & ER11-SCRW(C)|Y
01|209603|2|1|Req.INS/Install E16-NUT & ER16-SCRW(C)|Y
01|209603|3|1|Req.INS/Install E16-NUT & ER16-SCREW(S)|Y
01|209603|4|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|209603|5|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|209603|6|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|209603|7|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|209603|8|1|Req.INS/Install E20-NUT-G & ER20-SCREW(C)|Y
01|209614|1|1|1st Batch/968211 Tool Krib|Y
01|209614|2|1|1st Batch/(4)968545 HFO/Innovative Machine|Y
01|209615|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|209625|2|1|EXTERNAL POWER/FEEDBACK CABLE FOR 4TH AXIS|Y
01|209625|2|2|AIR LINE FOR HAAS MACHINE WILL ALSO BE INCLUDED|Y
01|209658|1|1|BT50-ZL38-150|Y
01|209662|1|1|SKBX-10|Y
01|209662|2|1|SKBX-1316|Y
01|209662|3|1|SKBX-16|Y
01|209662|4|1|SKBX-610|Y
01|209662|5|1|ST3/4-SK6-81|Y
01|209662|5|2|List price will be $330|Y
01|209662|6|1|ST3/4-SK6-141|Y
01|209662|6|2|List price will be $424|Y
01|209662|7|1|ST3/4CM-SK6-97|Y
01|209662|7|2|List price will be $330|Y
01|209662|8|1|K5/8CM-MMC4-50|Y
01|209662|8|2|List price will be $445|Y
01|209662|9|1|Part# K3/4CM-MMC8-80|Y
01|209662|9|2|List price will be $445|Y
01|209662|10|1|HSK80F-SF12-80B-LY|Y
01|209662|10|2|List price will be $1741.00|Y
01|209662|11|1|HSK80F-SF16-80B-LY|Y
01|209662|11|2|List price will be $1741.00|Y
01|209662|12|1|HSK80F-SF20-90B-LY|Y
01|209662|12|2|List price will be $1773.00|Y
01|209662|13|1|HSK80F-SF25-100B-LY|Y
01|209662|13|2|List price will be $1806.00|Y
01|209666|1|1|*non-standard - special*|Y
01|209686|1|1|This item is considered a special and is|Y
01|209686|1|2|non-cancellable and non-returnable once a PO has been|Y
01|209686|1|3|placed.|Y
01|209691|1|1|This is the one in your picture|Y
01|209700|1|1|SKU 80630890|Y
01|209700|3|1|SKU 08395378|Y
01|209700|4|1|SKU 08396442|Y
01|209700|5|1|SKU 97637193|Y
01|209700|6|1|SKU 97679138|Y
01|209700|7|1|SKU 98377021|Y
01|209700|8|1|SKU 05014261|Y
01|209715|3|1|This is a special once ordered cannot be cancelled|Y
01|209715|3|2|or returned.|Y
01|209715|4|1|This is a special once ordered cannot be cancelled|Y
01|209715|4|2|or returned.|Y
01|209729|1|1|SG-1091112|Y
01|209745|1|1|RGA#LVR-60381/|Y
01|209745|1|2|Repair of NK103-12000 s/n:AL0029 (Aple#NK103-12002)|Y
01|209745|2|1|Bearings o-rings collet nut and spidle to be replaced|Y
01|209750|1|1|This item is not returnable.|Y
01|209752|1|1|This is a non standard stock item. Once ordered it|Y
01|209752|1|2|cannot be cancelled or returned.|Y
01|209752|2|1|This is a non standard stock item. Once ordered it|Y
01|209752|2|2|cannot be cancelled or returned.|Y
01|209753|1|1|T01|Y
01|209753|2|1|T02|Y
01|209753|3|1|T03|Y
01|209753|4|1|T04|Y
01|209753|5|1|T05|Y
01|209753|6|1|T06|Y
01|209753|7|1|T07|Y
01|209753|8|1|T08|Y
01|209753|9|1|T09|Y
01|209753|10|1|T10|Y
01|209753|11|1|T11|Y
01|209753|12|1|T12|Y
01|209753|13|1|T13|Y
01|209753|14|1|T14|Y
01|209753|15|1|T15|Y
01|209753|16|1|T16|Y
01|209753|17|1|T17|Y
01|209753|18|1|T18|Y
01|209753|19|1|T19|Y
01|209753|20|1|T20|Y
01|209753|21|1|T21|Y
01|209753|22|1|*non-coolant|Y
01|209758|9|1|INCLUDES 8 TOTAL HOURS FOR INSTALL & TRAINING|Y
01|209759|1|1|REPAIR OF 5AX-201MA-M-AB SN: 6950|Y
01|209759|1|2|TAR-60410|Y
01|209759|1|3|CUSTOMER CRASHED TOOL TO ROTARY TABLE AT 0 DEG TILT|Y
01|209759|1|4|ACCURACY OF THE TABLE WAS SHIFTED NEED TO RE-ALIGN|Y
01|209759|1|5|AND REPLACE TUBULAR ROLLER BEARINGS BECUASE OF CRASH|Y
01|209760|1|1|T01|Y
01|209760|2|1|T02|Y
01|209760|3|1|T03|Y
01|209760|4|1|T04|Y
01|209760|5|1|T05|Y
01|209760|6|1|T06|Y
01|209760|7|1|T07|Y
01|209760|8|1|T08|Y
01|209760|9|1|T09|Y
01|209760|10|1|T10|Y
01|209760|11|1|T11|Y
01|209760|12|1|T12|Y
01|209760|13|1|T13|Y
01|209760|14|1|T14|Y
01|209760|15|1|T15|Y
01|209760|16|1|T16|Y
01|209760|17|1|T17|Y
01|209760|18|1|T18|Y
01|209760|19|1|T19|Y
01|209760|20|1|T20|Y
01|209760|21|1|T21|Y
01|209760|22|1|*non-coolant|Y
01|209760|29|1|For your reference several sizes of SK25 and SK10|Y
01|209760|29|2|collets are listed below. Please let us know the size|Y
01|209760|29|3|you need.|Y
01|209780|5|2|`|N
01|209780|22|1|*non-coolant|Y
01|209782|4|1|This is a NET charge for Lyndex Nikken to help design|Y
01|209782|4|2|and make a custom positioning block for the NX5 Unit.|Y
01|209782|4|3|Customer will need to supply machine and spindle info|Y
01|209782|4|4|and drawing or dimensions.|Y
01|209784|18|1|SPECIAL ORDER - NON-CANCELABLE/NON-RETURNABLE|Y
01|209790|1|1|We can plug DIN coolant here. ETA 2-3 Days|Y
01|209790|2|1|5 degree set screw|Y
01|209792|1|1|Mazak Pull Sttuds|Y
01|209792|2|1|Haas Pull Studs|Y
01|209803|2|1|REF DRAWING #TAKANG_DCM1422_PB110_SO#945015|Y
01|209804|3|1|Stock Japan|Y
01|209804|4|1|**Balance of 31pcs Late April|Y
01|209804|6|1|**Balance of 26pcs ETA 4 mos ARO|Y
01|209804|10|1|Special- cannot be cancelled or returned|Y
01|209804|12|1|**Balance 21pcs 4mths MFG + SHIP|Y
01|209804|12|2|Special- cannot be cancelled or returned|Y
01|209804|14|1|**Balance 21pcs 3.5-4mths MFG + SHIP|Y
01|209804|15|1|Balance of 2 pcs 4 weeks|Y
01|209806|3|1|End Support with 4+1 rotary union included|Y
01|209816|2|1|includes: Drive unit short bar fiber optic cable|Y
01|209816|2|2|communications cabe external cables parameter changes|Y
01|209816|2|3|service time and travel.|Y
01|209816|2|4|Installation to done at the same time.|Y
01|209816|5|1|M-code installation|Y
01|209836|5|1|Only one left! This item is not returnable|Y
01|209836|9|1|This is not returnable.|Y
01|209836|14|1|Extra 20% for overstock promo on part #'s|Y
01|209836|14|2|CAT40-SF0750-3.15 & CAT40-SF0750-6.30|Y
01|209842|1|1|Includes Haas motor and cable set.|Y
01|209852|1|1|Hydraulic Braking|Y
01|209852|2|1|500 PSI Hydraulic Tank and Pump for Table Brake System|Y
01|209852|3|1|Installation Includes: Travel Labor Installation|Y
01|209852|3|2|components and/or wiring for 5AX rotary table and|Y
01|209852|3|3|hydraulic unit. We will install rotary table and hyd|Y
01|209852|3|4|unit set parameters and zeros. Machine will be ready|Y
01|209852|3|5|for production set up when we are finished.|Y
01|209852|4|1|NET Pass through charge for custom made adapter plate|Y
01|209852|4|2|for mounting Nikken 5AX-201 to Haas VF3SS machine bed.|Y
01|209852|4|3|Plate will be .750-1.0 thick and provide clearance hole|Y
01|209852|4|4|locations for mounting to machine as well as tapped|Y
01|209852|4|5|holes for rotary table toe clamping. Will also have a|Y
01|209852|4|6|slip fit keyway slot to accept the rotary table keys|Y
01|209852|4|7|that provide alignment to the machine.|Y
01|209853|1|1|HSK100A-MTA3-140 HSK100A Morse Taper MT3 Adapter|Y
01|209853|1|2|Please Note: This item is non standard stock. Once|Y
01|209853|1|3|a purchase order is placed it cannot be cancelled|Y
01|209853|1|4|or returned.|Y
01|209854|36|1|NBT40-SK10C-60P-J|Y
01|209854|36|2|NBT40 DualContact Slim Chuck SK10 Coolant High Spd 30K|Y
01|209854|36|3|G2.5 with coolant nut installed|Y
01|209854|61|1|NBT40-SK16C-60P-J|Y
01|209854|61|2|NBT40 DualContact Slim Chuck SK16 Coolant High Spd 25K|Y
01|209854|61|3|G2.5 with coolant nut installed|Y
01|209861|21|1|A tariff surcharge of 8% will be added to every order|Y
01|209861|21|2|placed after September 1st 2025(until further notice).|Y
01|209861|21|3|This surcharge will be acknowledged upon acceptance|Y
01|209861|21|4|of every order.|Y
01|209867|1|1|Last one in stock being replaced by line 2|Y
01|209886|1|1|RGA#CUR-60372/|Y
01|209886|1|2|Repair of MRAM-ER20L s/n:65011 02 (Mimatic#162708)|Y
01|209886|2|1|Bearings seals and o-rings to be replaced.|Y
01|209891|1|1|installed w/ PS-123E at factory|Y
01|209891|2|1|installed on NC5-46-SK20C-90 at factory|Y
01|209902|2|1|Lyndex-Nikken to make position block upon receipt|Y
01|209902|2|2|of final spindle drawing confirmation|Y
01|209931|6|1|Alps OHA00-11000 s/n# AL001|Y
01|209931|6|2|**3month warranty**|Y
01|209931|6|3|This has been inspected loading works fine and rotates|Y
01|209931|6|4|smoothly. There is minor wear and dings on housing.|Y
01|209931|6|5|Cannot be cancelled or returned.|Y
01|209931|6|6|Pictures of unit have been sent with the quotation.|Y
01|209933|1|1|Part# TBD CAT40 AngleHead ER32 Coolant  THRU PIN|Y
01|209933|1|2|65mm Pitch Taper Pin.|Y
01|209933|1|3|Lead time includes 6 weeks design + 15 Wks Mfg + Ship|Y
01|209939|1|1|Orizon Spec:|Y
01|209939|1|2|Pan Head Screws Balluff Chips Installed Coolant Tubes|Y
01|209939|1|3|Installed and Rego Nuts: 3420.00000|Y
01|209939|3|1|Pan Head Screws Balluff Chips Installed Coolant Tubes|Y
01|209939|3|2|Installed and standard ER40 collet nut|Y
01|209946|1|1|BT50-FMH22-47-150|Y
01|209946|1|2|BT50 Shell Mill Holder 22mm|Y
01|209974|1|1|Lyndex-Nikken to make positioning block for the|Y
01|209974|1|2|angle head Impact CNC will be purchasing|Y
01|209974|1|3|NET PRICE|Y
01|209979|1|1|Nikken Part # HSK63A-ZDS12-110|Y
01|209979|1|2|Dream Synchro Tap Holder|Y
01|209979|2|1|Nikken Part # ZDK12-6|Y
01|209984|3|1|HSK63A-SK16-80-J|Y
01|209984|14|1|HSK63A-SK10C-90-J|Y
01|209987|1|1|RGA#TAR-60314|Y
01|209987|1|2|5AX-130YA-M  SN:5880|Y
01|209997|1|1|This is a non-standard stock item and is considered|Y
01|209997|1|2|special. Once ordered it cannot be cancelled/returned.|Y
01|209997|6|1|This is a non-standard stock item and is considered|Y
01|209997|6|2|special. Once ordered it cannot be cancelled/returned.|Y
01|209998|6|1|20% Overstock promotion has been applied to|Y
01|209998|6|2|QCFC42-024-SMO QCFC42-15M-EMR QCFC42-30M-EMR|Y
01|209998|6|3|Does not apply to other collets quoted.|Y
01|209999|1|1|This is a non-standard stock item and is considered|Y
01|209999|1|2|special. Once ordered it cannot be cancelled/returned.|Y
01|209999|6|1|This is a non-standard stock item and is considered|Y
01|209999|6|2|special. Once ordered it cannot be cancelled/returned.|Y
01|210001|1|1|1st Batch|Y
01|210001|2|1|1st Batch|Y
01|210002|1|1|This item is not returnable.|Y
01|210003|2|1|TCD-A3133|Y
01|210004|3|1|CAT40-SK16F-60U-IDU-M|Y
01|210004|5|1|CAT40-SK16F-90U-IDU-M|Y
01|210004|7|1|CAT40-SK16F-150U-IDU-M|Y
01|210010|4|1|Please note: Net price includes installation of chip|Y
01|210010|4|2|hole and BIS-C-122-04/ and holder rebalanced|Y
01|210010|4|4|receipt of chips|Y
01|210030|1|1|N5001-1500-1.88 NMTB50 Shell Mill Holder 1.1/2|Y
01|210037|1|1|HSK80F tool clamper|Y
01|210037|1|2|TCL-80|Y
01|210040|3|1|Net price|Y
01|210040|7|1|Net price|Y
01|210069|8|1|This is an install kit and only contains needed install|Y
01|210069|8|2|hardware components. Meredith Machinery would be|Y
01|210069|8|3|responsible for performing the physical installation of|Y
01|210069|8|4|all components.|Y
01|210086|7|1|PRE-TTS-12TTSLI - TOOL TRACKING SOFTWARE|Y
01|210086|7|2|SOFTWARE FOR 8 MACHINES AND ONE QR CODE SCANNER|Y
01|210086|9|1|INCLUDES 1 QR CODE READER & QR CODE LABELS PER ITEM|Y
01|210086|10|1|INCLUDES 8 TOTAL HOURS FOR INSTALL & TRAINING|Y
01|210098|3|1|Price reflects net charge /|Y
01|210098|3|2|This holder is non-returnable and non-cancelable|Y
01|210110|8|1|Please Note: I have added the extra 10% to the discount|Y
01|210110|8|2|for the Live Tool promotion we are offering to Butler.|Y
01|210110|8|3|If quantities should change please re-submit for|Y
01|210110|8|4|new quote. This promo is good until March 312024.|Y
01|210125|1|1|Hi Blake Please send order directly to Beth Welch|Y
01|210125|1|2|bethw@lyndexnikken.com and we will remove an E25-Nut|Y
01|210125|1|3|from a holder we have in stock.|Y
01|210133|1|1|1st Batch/(4)962392  10/24 approved by Ben|Y
01|210133|2|1|1st Batch/T/P Inspection Required 10/24 approved/BT|Y
01|210149|14|1|For 5-10mm Cutter Shank|Y
01|210149|15|1|For 10-16mm Cutter Shank|Y
01|210149|18|1|For 6-16mm Cutter Shanks|Y
01|210151|1|1|Table and external cables package.|Y
01|210154|3|1|This item is considered special once ordered it cannot|Y
01|210154|3|2|be cancelled or returned. Net price has been quote.|Y
01|210154|4|1|This item is considered special once ordered it cannot|Y
01|210154|4|2|be cancelled or returned. Net price has been quote.|Y
01|210161|1|1|CNCZ180LYA-BR SN: 6011|Y
01|210161|1|2|TAR-60399|Y
01|210161|1|3|ROTARY TABLE NEEDS REBUILD - REPLACING WORM SCREW|Y
01|210161|1|4|BEARINGS/SEALS/O-RING|Y
01|210166|2|1|Two pots included at no charge with purchase of start2|Y
01|210177|5|1|NBT40-SK6C-60P-J|Y
01|210177|5|2|NBT40 DualContact Slim Chuck SK6 Coolant High Speed 30K|Y
01|210177|5|3|G2.5 with coolant nut installed|Y
01|210177|36|1|NBT40-SK10C-60P-J|Y
01|210177|36|2|NBT40 DualContact Slim Chuck SK10 Coolant High Spd 30K|Y
01|210177|36|3|G2.5 with coolant nut installed|Y
01|210177|61|1|NBT40-SK16C-60P-J|Y
01|210177|61|2|NBT40 DualContact Slim Chuck SK16 Coolant High Spd 25K|Y
01|210177|61|3|G2.5 with coolant nut installed|Y
01|210220|3|1|Requires Riser to match Centerline of CNC321BFA-M|Y
01|210232|1|1|INCLUDES:|Y
01|210232|1|2|-(2) 6 PORT (1000 PSI MAX) BUILT IN ROTARY UNIONS|Y
01|210237|4|1|Lyndex-Nikken will have customer's existing:|Y
01|210237|4|2|H10ARAM-ER32-210OT-110TP units|Y
01|210237|4|3|converted to Internal Coolant.|Y
01|210237|4|4|RGA required for modification.|Y
01|210237|4|5|Delivery is 4-5weeks from receipt of customer's units|Y
01|210237|4|6|and receipt of PO.|Y
01|210237|4|7|These units have been modified. These cannot be|Y
01|210237|4|8|cancelled or returned.|Y
01|210237|4|9|Approval drawing will be required for modification.|Y
01|210237|4|10|Heads will have H10ARAM-ER32-210OTIC-110TP ID tag added|Y
01|210244|1|1|Birla AIR#232470234|Y
01|210244|1|2|No INS Req'd.|Y
01|210249|1|1|non-cancelable/non-returnable|Y
01|210250|1|1|Table weight Horizontal 1000kg (1760lbs)|Y
01|210256|1|1|Please Note: Special one time discount offered. This|Y
01|210256|1|2|product is our Flash Sale item this week and expires|Y
01|210256|1|3|01/26. Normal discount is 18%.|Y
01|210256|1|4|Go to www.lyndexnikken.com for more information.|Y
01|210256|2|1|Sold Separately from BT30-TB1.1/4-10.00NF|Y
01|210256|4|1|BT30-TB40-300 BT30 Test Bar 40x300mm w/PS-132 installed|Y
01|210256|4|2|into testbar. Please note BT30-TB40-300 is special.|Y
01|210256|4|3|Once a purchase order is placed it cannot be cancelled|Y
01|210256|4|4|or returned.|Y
01|210256|7|1|BT30-TB40-150  BT30 Test Bar 40x150mm PS-132 installed|Y
01|210256|7|2|into testbar. Please note BT30-TB40-150 is special.|Y
01|210256|7|3|Once a purchase order is placed it cannot be cancelled|Y
01|210256|7|4|or returned.|Y
01|210257|1|1|We are removing this table from our showroom to meet|Y
01|210257|1|2|this special price. We will not be able to meet price|Y
01|210257|1|3|on the next Purchase Order.|Y
01|210261|1|1|CUSTOMER TO VERIFY COUNTERBORE DEPTH WILL WORK PER JIS|Y
01|210261|3|1|Please Note: Above toolholder is on our Overstock|Y
01|210261|3|2|promotion. I have added the extra 20% to the discount.|Y
01|210261|3|3|Maybe you customer wants to order more than one:)|Y
01|210283|9|1|ISO50 TO VDI25 ADAPTER|Y
01|210283|14|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|210290|1|1|These are specials once ordered cannot be cancelled or|Y
01|210290|1|2|returned.|Y
01|210306|2|1|Please note: I have added the extra 20% to the discount|Y
01|210306|2|2|on this quote for the Overstock promotion.|Y
01|210309|2|1|Power and feedback cables from 4th axis to machine|Y
01|210309|2|2|bulkhead|Y
01|210314|1|1|Rework - 8 holders|Y
01|210314|1|2|Machine ID Chip Hole & Rebalance to 15K RPM @ G2.5|Y
01|210314|1|3|3x HSK100A-C3/4-115 - 1x HSK100A-C-115|Y
01|210314|1|4|3x HSK100A-VC13-105 - 1x HSK100A-SK16C-200|Y
01|210317|1|1|These are non-standard stock items and considered|Y
01|210317|1|2|specials. Once a PO has been issued these items cannot|Y
01|210317|1|3|be returned or cancelled|Y
01|210327|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|210328|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|210329|2|1|NBT40-FMH22-47-60|Y
01|210344|1|1|final part# CAT40-C1.1/4SLF-105UGIDUM|Y
01|210344|1|2|CAT40 Milling Chuck 1.1/4 Nose=69 HiSpeed ChipHole|Y
01|210344|1|3|HiSpeed 20K - Modified Din Coolant Through the Flange|Y
01|210344|2|1|final part# CAT40-C1F-85UG-IDU-DIN|Y
01|210344|2|2|CAT40 Milling Chuck 1 HiSpeed ChipHole 20K|Y
01|210344|2|3|- Modified Din Coolant Through the Flange|Y
01|210344|3|1|- Modified Din Coolant Through the Flange|Y
01|210350|1|1|Order Part # C4-SZF16S-55-A|Y
01|210350|1|2|1-9 pc price = $1992.00 net each|Y
01|210350|1|3|10-19 pc price = $1558.00 net each|Y
01|210350|1|4|20-29 pc price = $1120.00 net each|Y
01|210350|1|5|Considered Special cannot be cancelled or returned.|Y
01|210352|1|1|This item cannot be cancelled or returned.|Y
01|210357|1|1|Net price includes the following parts for assembly|Y
01|210357|1|2|at Lyndex-Nikken: HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|210357|1|3|and customers RFID chip. Holders will be re-balanced.|Y
01|210357|2|1|Net price includes the following parts for assembly|Y
01|210357|2|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|210357|2|3|customer's supplied RFID chip and holder re-balanced.|Y
01|210357|3|1|Net price includes the following parts for assembly|Y
01|210357|3|2|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|210357|3|3|and customers RFID chips. Holders to be re-balanced.|Y
01|210357|36|1|Net price include the following parts for assembly|Y
01|210357|36|2|at Lyndex-Nikken: HSK63-Tube and customer's supplied|Y
01|210357|36|3|RFID chip and holder re-balanced.|Y
01|210371|7|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|210376|7|1|A tariff surcharge may be added to this quotation in|Y
01|210376|7|2|the event of a sustained tariff increase on the|Y
01|210376|7|3|importation of this product.  Any surcharge will be|Y
01|210376|7|4|disclosed prior to acceptance of an order.|Y
01|210386|1|1|Includes: Base Plate Risers for High Column CAT50|Y
01|210386|1|2|Taper Flange and Hydraulic Cylinder package w/hardware.|Y
01|210386|1|3|New P/N will be 5AX-250HOSP4-M ARO.|Y
01|210392|1|1|Does not include motor or cables|Y
01|210394|1|1|P/N: SBH25-ECH10-70|Y
01|210394|1|2|Alps adjustable holder|Y
01|210395|2|1|Delivery is approx 6 months + 8 wks for boat shipment.|Y
01|210395|4|1|Note: Use existing Fanuc Amps these are not covered|Y
01|210395|4|2|by our Warranty.|Y
01|210398|1|1|RGA#LVR-60431/|Y
01|210398|1|2|Repair of OK102-18000 s/n:AL0033 (Alps#OK102-18000)|Y
01|210398|2|1|Bearings o-rings collet nut and spindle to be|Y
01|210398|2|2|replaced.|Y
01|210410|1|1|2-pcs 3~4 Weeks / 1-pc 13~14 Weeks|Y
01|210420|13|1|PRE-TTS-12TTSLI - TOOL TRACKING SOFTWARE|Y
01|210420|13|2|SOFTWARE FOR 20 MACHINES AND ONE QR CODE SCANNER|Y
01|210420|14|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|210420|14|2|FOR PRESETTER AND TTS SOFTWARE.|Y
01|210424|1|1|1st Batch 7/6:DWG Approved/TR|Y
01|210424|2|1|1st Batch|Y
01|210424|3|1|1st Batch/for stock   10/23 approved|Y
01|210424|4|1|Req.INS/T/P Inspection Required|Y
01|210424|5|1|Req.INS/T/P Inspection Required|Y
01|210424|6|1|Req.INS/T/P Inspection Required|Y
01|210424|7|1|1st Batch/(4)962392  10/24 approved by Ben|Y
01|210424|8|1|1st Batch/T/P Inspection Required 10/24 approved/BT|Y
01|210424|9|1|Req.INS/T/P Inspection Required|Y
01|210424|10|1|Req.INS/T/P Inspection Required|Y
01|210424|11|1|Req.INS/T/P Inspection Required|Y
01|210429|5|1|INCUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|210430|1|1|NON-STANDARD ITEM; NON-CANCELLABLE; NON-RETURNABLE|Y
01|210431|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|210442|1|1|This item is a non standard stock item considered|Y
01|210442|1|2|special. Once ordered it cannot be cancelled or|Y
01|210442|1|3|returned. In Stock at Nikken Japan.|Y
01|210451|1|1|Special deal. Net price.|Y
01|210452|5|1|Installed w/ PS-123-AIR at factory|Y
01|210452|6|1|Installed on NC5-46-FS16-37-60S at factory|Y
01|210459|1|1|RGA#TOR-60285/|Y
01|210459|1|2|Repair of SF-START2-UNIT-200 s/n:2J7147|Y
01|210459|1|3|Fee for repairing the tower of the shrink fit unit|Y
01|210463|1|1|OK-LB35-ER50X|Y
01|210463|1|2|Quoted at NET pricing|Y
01|210468|1|1|Part # BMT85-C6-ICE|Y
01|210468|1|2|BMT85 Live PSC C6 X<Radial>STRT IntExtCool7MP|Y
01|210468|1|3|For SMART NL6000XLM|Y
01|210468|1|4|This is a special. Once ordered cannot be cancelled or|Y
01|210468|1|5|returned. Parts subject to prior sale. C6 Clamping|Y
01|210468|1|6|sleeves can have delivery up to 30 weeks.|Y
01|210468|1|7|Aproximate delivery time 12 weeks after clarification|Y
01|210468|1|8|of all details and approval of the drawing.|Y
01|210473|2|1|Quoted at NET price|Y
01|210473|2|2|LN to thread blank draw nut to match customer's|Y
01|210473|2|3|machine drawtube|Y
01|210477|1|1|This item is a part of our overstock promotion and is|Y
01|210477|1|2|non-cancellable and non-returnable once a PO has been|Y
01|210477|1|3|placed.|Y
01|210483|2|1|*Lyndex-Nikken to make position block upon receipt|Y
01|210483|2|2|of spindle drawing specs|Y
01|210483|2|3|NET price|Y
01|210486|1|1|1st Batch/965647 Tomita|Y
01|210492|3|1|Kevin I added an extra 5% to the discount for the|Y
01|210492|3|2|promo.|Y
01|210496|1|1|C6-Pull Force Meter|Y
01|210498|1|1|Correct P/N will be 5AX-100SA-BR3/S357XD1 after|Y
01|210498|1|2|conversion for D00 control.|Y
01|210500|3|1|QUOTED AT NET PRICE; CUSTOM DRAWSCREW FOR CONNECTING|Y
01|210500|3|2|TO MACHINE DRAWTUBE|Y
01|210502|4|1|Test Item - Special Price - No Return After Purchase|Y
01|210502|5|1|Test Item - Special Price - No Return After Purchase|Y
01|210502|6|1|Test Item - Special Price - No Return After Purchase|Y
01|210506|4|1|NOTE: Brake Parameter and Center Height need to be|Y
01|210506|4|2|adjusted. Add Silencer.|Y
01|210506|4|3|Special NET price when purchasing 8units in FY24.|Y
01|210506|5|1|NOTE: Brake Parameter and Center Height need to be|Y
01|210506|5|2|adjusted. Add Silencer.|Y
01|210506|5|3|Special NET price when purchasing 8units in FY24.|Y
01|210506|10|1|Price after 3/31/23: $13662.00/EA|Y
01|210506|10|2|Gasket and Power Cable (25ft) included.|Y
01|210506|14|1|PLC-MCE0618K-FORM-2AX-001 (NX)|Y
01|210506|14|2|PLC#: NX Control 2 tables(Axis) with 1 PLC unit.|Y
01|210506|14|3|Delivery: 3months Mfg. + 2weeks development|Y
01|210506|15|1|PLC Engineering/Development Cost|Y
01|210507|1|1|Alternative for discontinued 100TG-SPAN|Y
01|210538|1|1|Please Note: Net price includes installation of|Y
01|210538|1|2|BIS-M-122-02/A. Pratt's # PT457340 REV-|Y
01|210538|2|1|Quoted at NET price.|Y
01|210549|3|1|*Item qualifies for additional 20% discount which has|Y
01|210549|3|2|been added as part of our Overstock Promomtion|Y
01|210549|3|3|All sales final|Y
01|210557|4|1|Customer to supply insert|Y
01|210562|5|1|Please Note: I added the extra 5% to the discount on|Y
01|210562|5|2|this quote.|Y
01|210563|5|1|INCLUDES 8 HOURS FOR INSTALL & TRAINING|Y
01|210570|2|1|This is Optional.|Y
01|210570|2|2|This Option for Lyndex Nikken to design and make the|Y
01|210570|2|3|positioning block for US Steel's Mazak MTV 815 VMC.|Y
01|210570|2|4|This requires customer to supply a spindle drawing of|Y
01|210570|2|5|the machine and/or any additional dimensions or info|Y
01|210570|2|6|needed.  Customer is also required to sign off on the|Y
01|210570|2|7|design drawing prior to Lyndex Nikken producing block.|Y
01|210570|2|8|NET Charge - Flat Fee Only|Y
01|210584|1|1|Quoted at NET price.|Y
01|210584|7|1|Quoted at NET price.|Y
01|210584|11|1|Quoted at NET price.|Y
01|210584|15|1|#V-EX-Cradle >> holds V-EX body.|Y
01|210584|15|2|Quoted at Net Price|Y
01|210595|1|1|Chuck Adapter Plates|Y
01|210595|1|2|NET PRICE|Y
01|210609|1|1|NC4001-0500-4.00CP|Y
01|210609|1|2|NCAT40 Dual Contact Shell Mill Holder 1/2 with Coolant|Y
01|210609|1|3|Ports. Please Note: Delivery is based upon receipt of|Y
01|210609|1|4|purchase order after final signed approval drawing is|Y
01|210609|1|5|received. Please allow additional time for the approval|Y
01|210609|1|6|draing process. Once an order is placed it cannot be|Y
01|210609|1|7|cancelled or returned.|Y
01|210609|3|1|NC4001-0500-4.00CP|N
01|210609|3|2|NCAT40 DualContact Shell Mill Holder 1/2 CoolantPorts|N
01|210609|3|3|Please Note: Delivery is based upon receipt of purchase|N
01|210609|3|4|order after final signed approval drawing is received|N
01|210609|3|5|Please allow additional time for the drawing approval|N
01|210609|3|6|process. Once an order is placed it cannot be cancelled|N
01|210609|3|7|or returned.|N
01|210609|4|1|NC4001-0500-4.00CP|N
01|210609|4|2|NCAT40 DualContact Shell Mill Holder 1/2 CoolantPorts|N
01|210609|4|3|Please Note: Delivery is based upon receipt of purchase|N
01|210609|4|4|order after final signed approval drawing is received|N
01|210609|4|5|Please allow additional time for the drawing approval|N
01|210609|4|6|process. Once an order is placed it cannot be cancelled|N
01|210609|4|7|or returned.|N
01|210610|1|1|Label box with customer pn 51-1000383|Y
01|210612|19|1|*Adjustable Torque Wrench handle|Y
01|210612|20|1|*Basic Handle no torque adjustment|Y
01|210612|27|1|standard wrench for NB3007-0011-4.00 if customer does|Y
01|210612|27|2|not want to use torque wrench|Y
01|210638|1|1|C4-EM0750-55   C4 3/4 End Mill holder.|Y
01|210638|1|2|10+ piece price $242 net each|Y
01|210638|1|3|These are specials once orderd cannot be cancelled or|Y
01|210638|1|4|returned.|Y
01|210651|1|1|RGA#TOR-59915/|Y
01|210651|1|2|Repair of CAT50-C1.1/4-105U-IDU|Y
01|210682|5|1|Hoses and Fittings|Y
01|210682|11|1|THIS PRICE IS CONTINGENT ON TABLE AND HYD UNIT BEING|Y
01|210682|11|2|SENT TO LYNDEX FOR NEEDED MODIFICATIONS.  THEN LN WILL|Y
01|210682|11|3|SEND TABLE AND HYD UNIT BACK TO C&A ALONG WITH SERVICE|Y
01|210682|11|4|TECHNICIAN TO COMPLETE THE MACHINE SIDE OF INTEGRATION.|Y
01|210687|5|1|Hoses and Fittings|Y
01|210687|11|1|THIS PRICE IS CONTINGENT ON TABLE AND HYD UNIT BEING|Y
01|210687|11|2|SENT TO LYNDEX FOR NEEDED MODIFICATIONS.  THEN LN WILL|Y
01|210687|11|3|SEND TABLE AND HYD UNIT BACK TO C&A ALONG WITH SERVICE|Y
01|210687|11|4|TECHNICIAN TO COMPLETE THE MACHINE SIDE OF INTEGRATION.|Y
01|210705|1|1|1st Batch 12/4:DWG Saved in Teams File.|Y
01|210714|1|1|MZMP5-ER40Y-ICE|Y
01|210714|2|1|MZMP5-ER40Y-ICE|Y
01|210735|2|1|Part # NC5-46-BLK80-152.4 -NC5-46 80mm Dia Blank Bar 6|Y
01|210735|2|2|Pull stud will be installed at the factory and will be|Y
01|210735|2|3|an extra cost.|Y
01|210735|3|1|Part #NC5-46-BLK80-203.2 - NC5-46 80mm Dia Blank Bar 8|Y
01|210735|3|2|Pull stud will be installed at the factory and will be|Y
01|210735|3|3|an added cost|Y
01|210735|4|1|Part #NC5-100-BLK80-152.4 -NC5-63 80mm Dia Blank Bar 6|Y
01|210735|4|2|Pull stud will be installed at the factory and will be|Y
01|210735|4|3|added cost.|Y
01|210735|5|1|Part #NC5-100-BLK80-203.2 -NC5-63 80mm Dia Blank Bar 8|Y
01|210735|5|2|Pull stud will be installed at the factory and will be|Y
01|210735|5|3|added cost|Y
01|210735|6|1|Part #NC5-63-BLK80-152.4 -NC5-63 80mm Dia Blank Bar 6|Y
01|210735|6|2|Pull stud will be installed at the factory and will be|Y
01|210735|6|3|added cost|Y
01|210735|7|1|Part #NC5-63-BLK80-203.2 - NC5-63 80mm Dia Blank Bar 8|Y
01|210735|7|2|Pull stud will be installed at the factory and will be|Y
01|210735|7|3|added cost|Y
01|210737|5|1|Please Note: The promotional 10% has been added to|Y
01|210737|5|2|the discount.|Y
01|210751|1|1|HSK40A-C20-100|Y
01|210751|1|2|HSK40A Milling Chuck 20mm 8Krpm|Y
01|210751|2|1|K20-SK6-120-J|Y
01|210751|2|2|20mm Straight Shank Extension Slim Chuck SK6 with J-Nut|Y
01|210751|2|3|Please use in combination with J-Cap.|Y
01|210751|3|1|K20-SK10-120-J|Y
01|210751|3|2|20mm Straight Shank Extension Slim Chuck SK10 withJ-Nut|Y
01|210751|3|3|Please use in combination with J-Cap.|Y
01|210757|1|1|PF-RFSS-12.0-EVO|Y
01|210757|2|1|PF-RMSS-12.0-EVO|Y
01|210757|3|1|PF-RFSS-12.00|Y
01|210760|1|1|T00199|Y
01|210760|2|1|T32213|Y
01|210760|3|1|T32248|Y
01|210760|4|1|T10102|Y
01|210772|3|1|Overstock promotion: 20% extra has been added to|Y
01|210772|3|2|the discount. I currently have 4 left in stock.|Y
01|210780|4|1|NOTE: Brake Parameter and Center Height need to be|Y
01|210780|4|2|adjusted. Add Silencer.|Y
01|210780|4|3|Special NET price. MOQ 4sets. FY24|Y
01|210780|5|1|NOTE: Brake Parameter and Center Height need to be|Y
01|210780|5|2|adjusted. Add Silencer.|Y
01|210780|5|3|Special NET price. MOQ 4sets. FY24|Y
01|210780|6|1|Center Height|Y
01|210780|10|1|Price after 3/31/23: $13662.00/EA|Y
01|210780|10|2|Gasket and Power Cable (25ft) included.|Y
01|210804|1|1|5C .400 dia Precision Ground Collet|Y
01|210804|1|2|MOQ 5 pcs|Y
01|210804|2|1|5C .410 dia Precision Ground Collet|Y
01|210804|2|2|MOQ 5 pc|N
01|210806|1|1|CAT50-ZL38-180U Auto Depth Control Tapper Chuck|Y
01|210806|1|2|DELIVERY: 1-pc 1~2 Weeks ARO /1-pc 5~6 Weeks ARO|Y
01|210833|1|1|20% OVERSTOCK Promotion Applied.|Y
01|210833|1|2|This item cannot be returned|Y
01|210868|1|1|Includes: Haas motor and cable set.|Y
01|210868|1|2|3rd party software option required.|Y
01|210868|1|3|Installation not included.|Y
01|210882|3|1|Ladder and software options must be avilable.|Y
01|210882|3|2|Machine must be capable of agging additional axis.|Y
01|210884|1|1|1st Batch/965647 Tomita|Y
01|210888|1|1|part# BT50-FMC22-60|Y
01|210888|1|2|BT50 22mm Face Mill w/ 60mm projection|Y
01|210888|2|1|part# BT50-FMC22-105|Y
01|210888|2|2|BT50 22mm Face Mill w/ 105mm projection|Y
01|210888|3|1|part# BT50-FMC22-150|Y
01|210888|3|2|BT50 22mm Face Mill w/ 150mm projection|Y
01|210889|2|1|Pots are included with the price of the shrink fit|Y
01|210889|2|2|machine.|Y
01|210918|3|1|Additional 20% discount has been applied to the above|Y
01|210918|3|2|items. Once a PO has been placed it cannot be returned|Y
01|210928|1|1|LVR-60461/|Y
01|210928|1|2|Repair of MNL12-SK20Z-ICE-10K s/n:18900810 08|Y
01|210928|1|3|(Mimatic#184650)|Y
01|210928|2|1|Bearings seals and o-rings to be replaced.|Y
01|210928|4|1|RGA#60461/|Y
01|210928|4|2|Repair of MNL12-SK20Z-MS-10K  s/n:98096 10|Y
01|210928|4|3|(Mimatic#192354)|Y
01|210928|5|1|Bearings seals o-rings damaged gears and threadring|Y
01|210928|5|2|to be replaced.|Y
01|210947|1|1|5AX-350FA-M SN: 3517|Y
01|210947|1|2|TAR-60441|Y
01|210947|26|1|REPLACEMENT TILT AXIS BODY|Y
01|210953|1|1|This item is not returnable.|Y
01|210956|2|1|New part # will be NC5001-1250-4.00CP Price and|Y
01|210956|2|2|availability is pending. I'll send update quote when|Y
01|210956|2|3|it's available.|Y
01|210986|14|1|*Not Tap Collet - no square drive - shank to hold 4-40|Y
01|210986|14|2|.140|Y
01|210986|15|1|*Not Tap Collet - no square drive - shank to hold 6-32|Y
01|210986|15|2|.194|Y
01|210988|1|1|Req.INS/Check HSK63-TUB&ID Chip equipped.|Y
01|210988|2|1|Req.INS/Install E40-NUT & ER40-SCREW(C)|Y
01|210988|3|1|1st Batch/ 11/16:DWG Approved/E/U|Y
01|210988|4|1|1st Batch/Install E25-NUT-G&ER25-SCREW(C) 7/13:DWGAPRVD|Y
01|210988|5|1|Req.INS/Install E32-NUT-G & ER32-SCRW(C)|Y
01|210988|6|1|Req.INS/REPEAT 963526 Hurst/GKN-KS *INS Report Included|Y
01|210997|1|1|Sn#  2J7049|Y
01|210997|1|2|*Demo unit- sold AS-IS*|Y
01|210997|1|3|6-month warranty from invoice date|Y
01|210997|1|4|*NET price|Y
01|210998|1|1|Req.INS/T/P Inspection Required|Y
01|210998|2|1|Req.INS/T/P Inspection Required|Y
01|210998|3|1|Req.INS/T/P Inspection Required|Y
01|210998|4|1|Req.INS/T/P Inspection Required (3)971175 Shelton/Lexai|Y
01|210998|5|1|Req.INS/T/P Inspection Required (4)971175 Shelton/Lexai|Y
01|211013|1|1|special item no cancelable no refundable after PO|Y
01|211013|1|2|for TAT-250 s/n.1506|Y
01|211027|1|1|20% OVERSTOCK Promotion applied.|Y
01|211027|1|2|This Item cannot be returned.|Y
01|211036|1|1|Includes: Indexer external cables control box|Y
01|211036|1|2|pendant for programming power cable M-code cable.|Y
01|211036|2|1|Special promotional pricing.|Y
01|211042|1|1|Extra 20% discount for Overstock Promotion|Y
01|211058|2|1|CNC2000FA-M|Y
01|211058|2|2|SCALE: RCN8590F Scale Mount Kit for RCN8590F|Y
01|211058|2|3|Riser plate angle plate and 2000mm faceplate|Y
01|211058|2|4|Special Item No Cancelable No Refundable after PO|Y
01|211058|2|5|Unit Price.|Y
01|211083|2|1|This item is considered special once ordered it cannot|Y
01|211083|2|2|be returned.|Y
01|211091|4|1|Overstock promotion discount added to the B4001-1250B|Y
01|211091|4|2|20%. This shell mill holder has a 2 gage length.|Y
01|211121|1|1|w/ PS-132 installed at factory|Y
01|211121|2|1|Installed on BT30-TB40-150 at factory|Y
01|211129|1|1|BT30-TB40-300|Y
01|211129|1|2|Will install PS-132 at Factory|Y
01|211129|2|1|Will install on BT30-TB40-300|Y
01|211141|1|1|Direct Replacement for SKN-6WB|Y
01|211153|2|1|PRE-TTS-12TTSLI - TOOL TRACKING SOFTWARE|Y
01|211153|2|2|SOFTWARE FOR 10 MACHINES AND ONE QR CODE SCANNER|Y
01|211186|1|1|Mimatic Part # 186327 / Ref Drawing 00047749|Y
01|211186|2|1|Mimatic Part # 186327 / Ref Drawing 00047749|Y
01|211193|1|1|*Additional 20% discount added for Overstock Promotion|Y
01|211193|1|2|on item S.EMAC6110-K01. Final Sale.|Y
01|211202|1|1|T/P Inspection Required|Y
01|211217|1|1|MANUAL TAILSTOCK OPTION - SWINGING CARRIAGE FOR LONG|Y
01|211217|1|2|PARTS.|Y
01|211217|2|1|MANUAL TAILSTOCK OPTION - TRADITIONAL MT3 IN-LINE QUILL|Y
01|211217|3|1|AIR/HYDRAULIC TAILSTOCK OPTION - WOULD ALSO NEED HAND|Y
01|211217|3|2|VALVE OR M-CODE ALLOCATION TO ACTUATE TAILSTOCK|Y
01|211217|4|1|TAIL SUPPOT TABLE OPTION - FOR TRUNNION TYPE SET UPS|Y
01|211219|3|1|Custom live center with tread to mount quick change|Y
01|211219|3|2|base.|Y
01|211219|4|1|ZeroLox M96C Zero Point Workholding Mechanical Console|Y
01|211219|5|1|Clamping Studs for ZeroLoX|Y
01|211219|5|2|(4 Studs per driver)|Y
01|211219|6|1|ZeroLoX M96C adapter to NCT200OSP4|Y
01|211219|6|2|Enduser can Manufacture Lyndex-Nikken will provide|Y
01|211219|6|3|Drawings|Y
01|211220|5|1|HSK63A-MMC12C-135-AT|Y
01|211220|6|1|HSK63A-MMC12C-147-AA|Y
01|211220|7|1|HSK63A-MMC8C-135-AT-RP|Y
01|211220|8|1|HSK63A-MMC8C-145-AA|Y
01|211220|9|1|HSK63A-MMC8C-175-AA|Y
01|211221|1|1|SRS-4.0F|Y
01|211221|3|1|SRS-18.0F|Y
01|211222|1|1|Includes: Table with motors 9+1 Rotary joint cable|Y
01|211222|1|2|sets for tilt and rotary axis hole pattern face plate|Y
01|211222|1|3|tilt axis mechanical brake and motor with brake no|Y
01|211222|1|4|rotary axis brake on the table.|Y
01|211222|1|5|Delivery 2-3 months after signed approval drawings|Y
01|211234|1|1|NSK HES510 Cat 40 with 1/4 collet|Y
01|211234|1|2|Price includes 1/4 collet|Y
01|211234|2|1|NE211 - 115 volt Controller|Y
01|211234|3|1|NE212 - 115 Volt Selector|Y
01|211235|3|1|Stock Japan|Y
01|211235|4|1|**Balance of 31pcs Late April|Y
01|211235|6|1|**Balance of 26pcs ETA 4 mos ARO|Y
01|211235|10|1|Special- cannot be cancelled or returned|Y
01|211235|12|1|**Balance 21pcs 4mths MFG + SHIP|Y
01|211235|12|2|Special- cannot be cancelled or returned|Y
01|211235|14|1|**Balance 21pcs 3.5-4mths MFG + SHIP|Y
01|211235|15|1|Balance of 2 pcs 4 weeks|Y
01|211256|2|1|Please Note this is our Flash Sale item this week only.|Y
01|211256|2|2|I have to have an order no later than 3:00 CST Friday|Y
01|211256|2|3|02-23.|Y
01|211263|4|1|Overstock Promo extra 20%. All sales are final!|Y
01|211286|1|1|ZDK12-6D|Y
01|211286|1|2|#1 ZDK12 PositiveDrive RigidTap Collet  6.0X4.9|Y
01|211286|1|3|Special Order. Unit Price Each. Non Cancelable.|Y
01|211286|2|1|ZDK12-8D7|Y
01|211286|2|2|#1 ZDK12 PositiveDrive RigidTap Collet 8.0X6.2|Y
01|211286|2|3|Special Order. Unit Price Each. Non Cancelable.|Y
01|211286|3|1|ZDK12-12D|Y
01|211286|3|2|#1 ZDK12 PositiveDrive RigidTap Collet 9.0x7.0|Y
01|211286|3|3|Special Order. Unit Price Each. Non Cancelable.|Y
01|211287|1|1|List Price for Presetter is $9500.00. Flash sale ends|Y
01|211287|1|2|today 2/9/24. 20% off list price|Y
01|211288|1|1|Flash Sale 2/5/24-2/9/24|Y
01|211296|1|1|Please Note: These toolholders are non-standard stock.|Y
01|211296|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|211296|1|3|or returned.|Y
01|211305|1|1|Please Note: These toolholders are non-standard stock.|Y
01|211305|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|211305|1|3|or returned.|Y
01|211306|7|1|CNCB450 Basic Repair|Y
01|211306|7|2|Bearings/Seals/O-Rings Will be Replaced|Y
01|211306|8|1|CNCB450 Brake Parts Repair|Y
01|211306|8|2|General Brake items most commonly replaced|Y
01|211306|9|1|CNCB450 Worm Wheel/Screw|Y
01|211306|9|2|Standard Speed|Y
01|211307|1|1|This item is on our OVERSTOCK list and allows an|Y
01|211307|1|2|additional 20% discount to pass onto the customer.|Y
01|211331|1|1|Final Part# C5001-1000-1.75CP-DIN-M|Y
01|211348|1|1|Order by 2/25 for delivery by week of 3/18|Y
01|211361|1|1|Includes cable set|Y
01|211361|3|1|Includes air lines and mounting of the closer|Y
01|211364|1|1|HSK100A shell mill ?|Y
01|211372|20|1|New part # will be NC5001-1250-4.00CP Please order|Y
01|211372|20|2|as such!|Y
01|211375|5|1|This item is considered special. Once ordered it cannot|Y
01|211375|5|2|be cancelled or returned.|Y
01|211375|8|1|This item is considered special. Once ordered it cannot|Y
01|211375|8|2|cancelled or returned|Y
01|211380|1|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|211380|2|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|211380|3|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|211380|4|1|E32-NUT & ER32-SCREW(C)|Y
01|211380|5|1|Req.INS/Install E32-NUT|Y
01|211380|6|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|211380|7|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|211380|8|1|Req.INS/Install E40-NUT & ER40-SCREW(C)|Y
01|211380|9|1|Req.INS/Install E25-NUT-G & ER25-SCRW(C)|Y
01|211380|10|1|Req.INS/Install E32-NUT-G & ER16-SCREW(C)|Y
01|211380|11|1|Req.INS/Install E32-NUT-G & ER32-SCREW(C)|Y
01|211390|4|1|INCLUDES CABLE MANAGEMENT SYSTEM FOR EACH ROTARY|Y
01|211392|7|1|SP CAT40 2Lock ER25 Angle Head  MOQ:1|Y
01|211392|7|2|Special Order. Unit Price Each. Non Cancelable.|Y
01|211392|8|1|SP CAT40 2Lock ER25 Angle Head  MOQ:2|Y
01|211392|8|2|Special Order. Unit Price Each. Non Cancelable.|Y
01|211392|9|1|SP CAT40 2Lock ER25 Angle Head  MOQ:4|Y
01|211392|9|2|Special Order. Unit Price Each. Non Cancelable.|Y
01|211392|17|1|SP CAT50 2Lock ER25 Angle Head  MOQ:1|Y
01|211392|17|2|Special Order. Unit Price Each. Non Cancelable.|Y
01|211392|18|1|SP CAT50 2Lock ER25 Angle Head  MOQ:1|Y
01|211392|18|2|Special Order. Unit Price Each. Non Cancelable.|Y
01|211392|19|1|SP CAT50 2Lock ER25 Angle Head  MOQ:1|Y
01|211392|19|2|Special Order. Unit Price Each. Non Cancelable.|Y
01|211393|2|1|This item is considered special once ordered it cannot|Y
01|211393|2|2|be cancelled or returned.|Y
01|211420|1|1|NK1.1/4-17/64|Y
01|211420|1|2|Straight Depth Adjustable Collet/Sleeve OD 1.1/4|Y
01|211420|1|3|ID 17/64|Y
01|211426|1|1|Overstock promo discount added to this quote.|Y
01|211437|1|1|RGA#TOR-60416/|Y
01|211437|1|2|Repair of BT40-C7/8-75|Y
01|211438|1|1|This item is special once ordered cannont be cancelled|Y
01|211438|1|2|or returned.|Y
01|211441|1|1|**Min Order Requirement 2pc**|Y
01|211441|1|2|Special- cannot be cancelled or returned|Y
01|211452|5|1|20 3-Jaw Manual Chuck w/ Adapter Plate|Y
01|211455|2|1|Tight Tqr: ~4mm : 15-22 Ft-Lbs 4-6mm : 22-30 Ft-Lbs|Y
01|211455|2|2|8-10mm : 33-41 Ft-Lbs|Y
01|211456|1|1|SK25-17AC|Y
01|211456|1|2|SK25 Slim Chuck Collet 17.0mm On Size Mechanical Coolan|Y
01|211475|1|1|Motor Model:  A06B-2223-B000 A4/5000iF A4000I|Y
01|211475|1|2|Feeler VBX 1650|Y
01|211475|1|3|Accurate MTS doing installation|Y
01|211476|1|1|This item is special once ordered cannont be cancelled|Y
01|211476|1|2|or returned.|Y
01|211489|7|1|SPECIAL DISCOUNT FOR DEMO UNIT $12000 LIST|Y
01|211489|7|2|SN# 2J7049|Y
01|211489|7|3|DEMO UNIT SOLD AS-IS|Y
01|211489|7|4|6-MONTH WARRANTY FROM INVOICE|Y
01|211531|1|1|RGA#TOR-60465/|Y
01|211531|1|2|Repair of W1000-TC1-2.60(C)|Y
01|211531|2|1|Calibration service included.|Y
01|211532|1|1|Next AIR cutoff is 03/05 for ETA to L-N Mid March|Y
01|211534|1|1|7 pcs Stock|Y
01|211534|1|2|12 pcs ETA 1 week|Y
01|211534|1|3|bal ETA 4/26/24|Y
01|211542|3|1|This item is complete special once orderd cannont be|Y
01|211542|3|2|cancelled or returned.|Y
01|211542|3|3|Net price has been quoted no further discount should be|Y
01|211542|3|4|taken. Allow extra time for drawing approval.|Y
01|211542|4|1|This is a discontinued item once ordered cannot be|Y
01|211542|4|2|cancelled or returned.|Y
01|211542|5|1|These are considered special once ordered they cannot|Y
01|211542|5|2|be cancelled or returned.|Y
01|211542|5|3|Net price has been quoted no further discount should be|Y
01|211542|5|4|taken|Y
01|211542|15|1|Non Returnable|Y
01|211542|16|1|Non Returnable|Y
01|211542|17|1|Non Returnable|Y
01|211542|18|1|Non Returnable|Y
01|211542|19|1|All sales are final on this item|Y
01|211542|20|1|All sales are final on this item|Y
01|211542|21|1|All sales are final on this item|Y
01|211542|22|1|All sales are final on this item|Y
01|211542|24|1|This item is considered special once ordered cannot|Y
01|211542|24|2|be cancelled or returned.  Net price has been quoted no|Y
01|211542|24|3|further discount should be taken. Allow extra time for|Y
01|211542|24|4|drawing approval processs.|Y
01|211549|1|1|INCLUDES CUSTOM BASEPLATE FOR MOUNTING TO EXISTING|Y
01|211549|1|2|MOUNTING LOCATIONS CURRENTLY USED BY KOMA TABLE|Y
01|211549|1|3|WE WILL NEED JTEKT OR TONER TO PROVIDE DIMENSIONS|Y
01|211549|1|4|FOR THESE FEATURES FOR FINAL BASEPLATE DESIGN|Y
01|211549|1|5|TABLE ALSO INCLUDES BUILT-IN 8 PORT ROTARY JOINT|Y
01|211549|1|6|FOR THRU SPINDLE HYDRAULICS TO BE INTEGRATING INTO|Y
01|211549|1|7|FIXTURE ASSEMBLY|Y
01|211549|2|1|ADAPTER PLATE FOR MOUNTING WORKHOLDING PLATE TO|Y
01|211549|2|2|ROTARY TABLE|Y
01|211549|3|1|THIS INSTALLATION INCLUDES FULL ELECTRICAL INTEGRATION|Y
01|211549|3|2|AND TESTING OF ROTARY TABLE FUNCTIONALITY|Y
01|211549|3|3|PHYSICAL INSTALLATION AND MODIFICATION OF MACHINE|Y
01|211549|3|4|SHEET METAL ENCLOSURE WILL BE DONE BY TONER MACHINING|Y
01|211549|4|1|ADDIITONAL FREIGHT CHARGE FOR AIR FREIGHT IF NEEDED|Y
01|211549|4|2|BOAT SHIPMENT IS INCLUDED AT NO COST WITH ROTARY|Y
01|211549|4|3|TABLE PURCHASE|Y
01|211554|17|1|Tool#1|Y
01|211554|18|1|Tool#2|Y
01|211555|1|1|This item is special once ordered cannont be cancelled|Y
01|211555|1|2|or returned.|Y
01|211558|1|1|RGA#LVR-60473/|Y
01|211558|1|2|Repair of MZQT5-CT40Z-ICE s/n:21907697 04|Y
01|211558|1|3|(Mimatic#103667)|Y
01|211558|2|1|Bearings seals and orings to be replaced.|Y
01|211565|1|1|PTS parts#: 4+1 ROTARY JOINT FOR AISIN|Y
01|211565|1|2|RT-ACCESSORY|Y
01|211565|1|3|NET Price.|Y
01|211565|2|1|Old parts#: TA251RB031226C01|Y
01|211565|3|1|** TEMP PLACE HOLDER **|Y
01|211565|3|2|ACTUAL PART # TCD-37315-R/1|Y
01|211566|1|1|PART # TCE-24110|Y
01|211566|2|1|PART # TCE-A4399|Y
01|211566|3|1|PART # TCE-A4400|Y
01|211589|1|1|RGA#LVR-60306/|Y
01|211589|1|2|Repair of MNL12-ER32Z-MS s/n:A2171 (Alps#T32216)|Y
01|211589|2|1|Bearings o-rings collet nut and spindle to be|Y
01|211589|2|2|replaced.|Y
01|211589|4|1|RGA#LVR-60306/|Y
01|211589|4|2|Repair of MNL12-ER32Z-MS s/n:A2415 (Alps#T32216)|Y
01|211589|5|1|Bearings o-rings collet nut and spindle to be|Y
01|211589|5|2|replaced.|Y
01|211597|2|1|This is non returnable|Y
01|211597|2|2|ffff|N
01|211606|1|1|Cannot cancel cannot return|Y
01|211606|3|1|Cannot cancel cannot return|Y
01|211611|1|1|RGA#LVR-60470/|Y
01|211611|1|2|Repair of OKL3-ER32X s/n:AL875 (Alps#OK101-14000)|Y
01|211611|2|1|Bearings o-rings collet nut and spindle to be|Y
01|211611|2|2|replaced.|Y
01|211615|1|1|BT30 Right Angle Head Dual ER16 Output max 6000rpm|Y
01|211615|1|2|Max torque 10Nm @2000rpm|Y
01|211615|1|3|Wrenches included|Y
01|211615|2|1|Idem|Y
01|211615|3|1|Idem|Y
01|211615|4|1|Idem|Y
01|211622|1|1|**Additional OVERSTOVCK Promo discount of 20% added|Y
01|211622|1|2|Final Sale**|Y
01|211626|1|1|CNC201MA        SN: 1441|Y
01|211626|1|2|TAR-60479|Y
01|211626|29|1|Part# TCE-91609|Y
01|211626|32|1|Power Wire Harness|Y
01|211626|33|1|External Cable Set|Y
01|211640|1|1|INCLUDES AIR/HYDRAULIC BOOSTER SO NO HYDRAULIC|Y
01|211640|1|2|INTERFACE IS REQUIRED ON OKUMA SIDE|Y
01|211640|3|1|PVC COATED EXTERNAL POWER/FEEDBACK CABLE FOR 4TH AXIS|Y
01|211640|3|2|INCLUDED AT NO COST TO MORRIS SOUTH|Y
01|211645|1|1|CNC202MA sn:31341TC|Y
01|211645|2|1|CNC202MA sn:31341TC|Y
01|211645|3|1|CNC202MA sn:31341TC|Y
01|211650|1|1|CNC202MA sn: 31341TC|Y
01|211657|1|1|CNC202MA sn: 31341TC|Y
01|211658|2|1|Cost is doubled on weekends and holidays. Only the firs|Y
01|211658|2|2|order will be serviced at weekday prices.|Y
01|211659|1|1|CNCZ302LF S/N: 6766 Machine : Horkos|Y
01|211659|1|2|Including: Parts wash/Inspection/Bearings/Seals/O-Rings|Y
01|211659|1|3|/Seals/O-Rings/WW/WS Assy + Labor.|Y
01|211662|1|1|This is a discontinued item and cannot be returned.|Y
01|211665|3|1|for 5.22mm/ .205|Y
01|211666|1|1|Includes Haas motor.|Y
01|211666|3|1|803 Swing box per drawing|Y
01|211666|6|1|Face Plate modification|Y
01|211668|1|1|CNC202MA SN: 31341TC|Y
01|211668|2|1|CNC202MA SN: 31341TC|Y
01|211671|3|1|These are complete specials once ordered they cannot|Y
01|211671|3|2|be cancelled or returned. Net price has been quoted no|Y
01|211671|3|3|further discount should be taken.|Y
01|211671|4|1|Only 6 available.|Y
01|211671|4|2|Discontinued and cannot be returned.|Y
01|211671|5|1|These are complete specials once ordered they cannot|Y
01|211671|5|2|be cancelled or returned. Net price has been quoted no|Y
01|211671|5|3|further discount should be taken.|Y
01|211671|8|1|This item is discontinued only 7 left in stock. Non-|Y
01|211671|8|2|returnable.|Y
01|211671|9|1|Replaces item above - new standard includes -IDU|Y
01|211671|9|2|IDU = ID Chip hole.|Y
01|211671|14|1|This item is discontinued and is no longer available|Y
01|211671|14|2|Cannot return.|Y
01|211671|15|1|This is a discontinued item only 3 left then no|Y
01|211671|15|2|longer available.|Y
01|211671|16|1|This item is discontinued and is no longer available|Y
01|211671|16|2|Cannot return|Y
01|211671|17|1|This item is discontinued and is no longer available|Y
01|211671|17|2|Cannot return|Y
01|211671|18|1|This item is discontinued and is no longer available|Y
01|211671|18|2|7 left in stock.  Cannot return|Y
01|211671|19|1|This is a complete special once ordered cannot be|Y
01|211671|19|2|cancelled or returned. Net price has been quoted no|Y
01|211671|19|3|further discount should be taken.|Y
01|211671|20|1|All sales are final on this item|Y
01|211671|21|1|All sales are final on this item|Y
01|211673|3|1|These are complete specials once ordered they cannot|Y
01|211673|3|2|be cancelled or returned. Net price has been quoted no|Y
01|211673|3|3|further discount should be taken.|Y
01|211673|4|1|Only 6 available.  Discontinued and cannot be returned.|Y
01|211673|5|1|These are complete specials once ordered they cannot|Y
01|211673|5|2|be cancelled or returned. Net price has been quoted no|Y
01|211673|5|3|further discount should be taken.|Y
01|211673|9|1|Replaces item above - new standard includes -IDU|Y
01|211673|9|2|IDU = ID Chip hole.|Y
01|211673|14|1|This item is discontinued and is no longer available|Y
01|211673|14|2|Cannot return.|Y
01|211673|15|1|This is a discontinued item only 3 left then no|Y
01|211673|15|2|longer available.|Y
01|211673|16|1|This item is discontinued and is no longer available|Y
01|211673|16|2|cannot return|Y
01|211673|17|1|This item is discontinued and is no longer available|Y
01|211673|17|2|Only 2 pcs left. Cannot return|Y
01|211673|18|1|Quoted as alternative for 3 Also discontinued 7 left|Y
01|211673|18|2|Cannot return.|Y
01|211673|19|1|This is a complete special once ordered cannot be|Y
01|211673|19|2|cancelled or returned. Net price has been quoted no|Y
01|211673|19|3|further discount should be taken.|Y
01|211673|20|1|All sales are final on this item|Y
01|211674|4|1|CUSTOM TRUNNION W/ WORK SURFACE OF 61.0 X 19.685|Y
01|211674|4|2|THAT IS WELDED STRESS RELIEVED & FINISHED GROUND.|Y
01|211674|4|3|INCLUDES THE FOLLOWING:|Y
01|211674|4|4|BASEPLATE FOR ASSEBLY|Y
01|211674|4|5|4 RISER BLOCKS FOR CLEARANCE|Y
01|211674|4|6|CUSTOM ANGLE PLATES FOR MOUNT ON CNC501 & TAT501|Y
01|211679|4|1|This item is considered special once ordered it cannot|Y
01|211679|4|2|be cancelled or returned.|Y
01|211691|1|1|** Closeout Promotion! All sales are FINAL!**|Y
01|211700|1|1|CNC300FA   SN: 1527|Y
01|211700|1|2|TAR-60501|Y
01|211707|6|1|Please Note: Discount reflects Overstock promotion.|Y
01|211709|1|1|Non-standard stock item cannot cancel or return.|Y
01|211712|1|1|CNC202MA SN: 31341TC|Y
01|211712|2|1|CNC202MA  SN: 31341TC|Y
01|211716|1|1|For CNC202MA SN: 31341TC|Y
01|211717|2|1|This item is special once ordered it cannot be|Y
01|211717|2|2|cancelled or returned.|Y
01|211719|1|1|For CNCZ180 SN: 20526T on Brother Machine Model R450X1|Y
01|211719|1|2|SN#112870|Y
01|211730|1|1|Next Log Late May|Y
01|211739|1|1|This is a modified standard. Once the modification|Y
01|211739|1|2|process has begun this cannot be cancelled or returned.|Y
01|211739|1|3|Net price has been quoted. No further discount should|Y
01|211739|1|4|be taken|Y
01|211756|1|1|5AX-2MT-105-120SA3   SN: 8124|Y
01|211756|1|2|RGA-TAR-60493|Y
01|211761|1|1|1st Batch/965647 Tomita 11/29:DWG Approved/Customer|Y
01|211766|1|1|HSK100T-C6-100 Polygon Holders|Y
01|211766|3|1|HSK100T-C6-110  Polygon Holders|Y
01|211771|1|1|For 5AX-2002FA-M  SN: 2308|Y
01|211771|1|2|RGA-TAR-60469|Y
01|211773|4|1|CUSTOM TRUNNION W/ WORK SURFACE OF 61.0 X 19.685|Y
01|211773|4|2|THAT IS WELDED STRESS RELIEVED & FINISHED GROUND.|Y
01|211773|4|3|INCLUDES THE FOLLOWING:|Y
01|211773|4|4|BASEPLATE FOR ASSEBLY|Y
01|211773|4|5|4 RISER BLOCKS FOR CLEARANCE|Y
01|211773|4|6|CUSTOM ANGLE PLATES FOR MOUNT ON CNC501 & TAT501|Y
01|211780|3|1|This item is considered special cannot be cancelled or|Y
01|211780|3|2|returned|Y
01|211780|4|1|This item is considered special cannot be cancelled or|Y
01|211780|4|2|returned|Y
01|211780|5|1|CARBIDE EXTENSION|Y
01|211780|5|2|This item is considered special cannot be cancelled or|Y
01|211780|5|3|returned|Y
01|211780|6|1|CARBIDE EXTENSION|Y
01|211780|6|2|This item is considered special cannot be cancelled or|Y
01|211780|6|3|returned|Y
01|211780|8|1|SLEEVE SO 25MM EXTENSIONS CAN BE USED IN YOUR|Y
01|211780|8|2|EXISTING 1.1/4 MILLING CHUCKS|Y
01|211815|1|1|These are complete specials once ordered they cannot|Y
01|211815|1|2|be cancelled or returned.|Y
01|211820|1|1|Quoted at NET price. Good luck:)|Y
01|211821|1|1|P/N: C50F1-2500-5.00CP|Y
01|211821|1|2|CAT50 2.1/2 Face/Shell Mill Holder with 5.00 g.l.|Y
01|211821|1|3|with coolant ports.|Y
01|211821|2|1|P/N: C50F1-2500-6.00CP|Y
01|211821|2|2|CAT50 2.1/2 Face/Shell Mill Holder with 6.00 g.l.|Y
01|211821|2|3|with Coolant Ports|Y
01|211826|1|1|2 pieces Stock|Y
01|211826|1|2|2 pieces ship 1-2 days|Y
01|211826|1|3|5 pieces ETA 4/12|Y
01|211867|1|1|Special Net Pricing for Lab Usage|Y
01|211867|1|2|Includes cables from table to cabinet.|Y
01|211884|1|1|Final part number: CAT40-SK6-90U-IDU-DIN-M|Y
01|211884|2|1|Final part number: CAT40-SK10-90U-IDU-DIN-M|Y
01|211884|3|1|Final part number: CAT40-SK16-90U-IDU-DIN-M|Y
01|211884|4|1|Final part number: CAT40-SF0125-5.12-DIN-M|Y
01|211884|5|1|Final part number: CAT40-SF0187-5.12-DIN-M|Y
01|211884|8|1|Final part number: CAT40-SF3-80-DIN-M|Y
01|211884|9|1|Final part number: CAT40-SF3-160-DIN-M|Y
01|211885|4|1|Includes: Drive unit short bar fiber optic cable|Y
01|211885|4|2|communications cable bulkhead cables external cables|Y
01|211885|4|3|parameter changes service time and travel.|Y
01|211887|1|1|**All Sales are Final**|Y
01|211901|1|1|RGA#CUR-60488/|Y
01|211901|1|2|Repair of C40RAM-ER32-180-65TP s/n:21901246 01|Y
01|211901|1|3|(Mimatic#178108)|Y
01|211901|2|1|Bearings seals and o-rings to be replaced.|Y
01|211901|4|1|RGA#CUR-60488/|Y
01|211901|4|2|Repair of C40RA-0025M s/n:18902340 17 (Mimatic#175241)|Y
01|211901|5|1|Bearings seals and o-rings to be replaced.|Y
01|211906|6|1|wrench for CAT40-ER16-2.76|Y
01|211909|1|1|RGA#LVR-60492/|Y
01|211909|1|2|Repair of MNL12-ER32Z-ICE-10K s/n:98901 02|Y
01|211909|1|3|(Mimatic#101523)|Y
01|211909|2|1|Bearings seals and o-rings to be replaced.|Y
01|211911|3|1|This item is considered special cannot be cancelled or|Y
01|211911|3|2|returned|Y
01|211911|4|1|This item is considered special cannot be cancelled or|Y
01|211911|4|2|returned|Y
01|211911|5|1|CARBIDE EXTENSION|Y
01|211911|5|2|This item is considered special cannot be cancelled or|Y
01|211911|5|3|returned|Y
01|211911|6|1|CARBIDE EXTENSION|Y
01|211911|6|2|This item is considered special cannot be cancelled or|Y
01|211911|6|3|returned|Y
01|211911|8|1|SLEEVE SO 25MM EXTENSIONS CAN BE USED IN YOUR|Y
01|211911|8|2|EXISTING 1.1/4 MILLING CHUCKS|Y
01|211913|1|1|Part # NCAT50-C25EX-111U-J|Y
01|211913|1|2|This item is considered special once ordered it cannot|Y
01|211913|1|3|be cancelled or returned.|Y
01|211920|1|1|Quoted at NET price.|Y
01|211922|1|1|Flash Sales Add 24% Disc. By 2/23/2024|Y
01|211922|4|1|Flash Sales Add 24% Disc. By 2/23/2024|Y
01|211928|1|1|20% Overstock Promo Discount applied.|Y
01|211928|1|2|Once a PO is placed this item cannot be cancelled or|Y
01|211928|1|3|returned.|Y
01|211939|1|1|Motors not included.|Y
01|211939|1|2|Includes table with external cables.|Y
01|211947|1|1|NLX2500|Y
01|211947|5|1|LB3000|Y
01|211958|1|1|No Safety Recess. Body may interfere with ATC Arm|Y
01|211959|2|1|4th & 5th axis Power and Feed back cables from|Y
01|211959|2|2|Nikken Table to Machine Bulkhead|Y
01|211965|3|1|C5-C3/4-65  Polygonal Taper C5  3/4 Milling Chuck|Y
01|211965|5|1|C5-C3/4-65  Polygonal Taper C5  3/4 Milling Chuck|Y
01|211965|10|1|C5-C1-75  Polygonal Taper C5  1 Milling Chuck|Y
01|211965|12|1|C5-C1-75  Polygonal Taper C5  1 Milling Chuck|Y
01|211974|1|1|FLASH SALE valid until 2/23|Y
01|211985|3|1|replaces SKN-6WB|Y
01|211985|4|1|SKN-10WB is not a valid part number think you meant|Y
01|211985|4|2|SKN-10B which was replaced by SKN-10K|Y
01|211986|1|1|Cannot cancel cannot return.|Y
01|211986|3|1|Cannot cancel cannot return.|Y
01|211997|9|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|211999|5|1|Joleeta I added the 20% discount to the items from|Y
01|211999|5|2|the Lyndex-Nikken Overstock noted on our web site.|Y
01|211999|5|3|Please use these to your advantage when requesting a|Y
01|211999|5|4|quote from MSC.|Y
01|212005|1|1|*** PLEASE NOTE QUOTED PRICE IS YOUR NET PRICE *****|Y
01|212005|1|2|*** PRICE IS BASED ON A ONE TIME PURCHASE OF 20 PCS ***|Y
01|212005|1|3|IF QUANTITIES DECREASE PRICES MUST BE RE-QUOTED.|Y
01|212005|1|4|DELIVERY OF THE BALANCE OF 20 PCS WILL BE 5 MONTHS|Y
01|212005|2|1|*** PLEASE NOTE QUOTED PRICE IS YOUR NET PRICE *****|Y
01|212005|2|2|*** PRICE IS BASED ON A ONE TIME PURCHASE OF 20 PCS ***|Y
01|212005|2|3|IF QUANTITIES DECREASE PRICES MUST BE RE-QUOTED.|Y
01|212005|2|4|DELIVERY OF THE BALANCE OF 20 PCS WILL BE 5 MONTHS|Y
01|212016|1|1|C5-PCMNN-00115-12DC >> C5 Turning Tool Direct Coolant|Y
01|212016|1|2|Supply/Lever Lock Clamp|Y
01|212016|1|3|If order is received by 02/26 ETA to L-N 03/15-18|Y
01|212016|1|4|QUOTED AT NET PRICE|Y
01|212024|1|1|Flash sale|Y
01|212026|1|1|No INS Req'd. BOAT#02212401-B|Y
01|212026|2|1|No INS Req'd. BOAT#02212401-B|Y
01|212033|1|1|Net price reflects the purchase of 1 to 3 tools.|Y
01|212033|1|2|Quoted at NET price.|Y
01|212033|1|3|Delivery: L-N currently has 5 in stock and balance of|Y
01|212033|1|4|tooling 2~3 weeks.|Y
01|212033|5|1|Net price reflects the purchase of 1 to 3 tools.|Y
01|212033|5|2|Quoted at NET price.|Y
01|212033|5|3|Delivery: L-N currently has 5 in stock and balance of|Y
01|212033|5|4|Mid to end of April.|Y
01|212041|1|1|1st Batch  10/12 approved|Y
01|212041|2|1|Req.INS/T/P Inspection Required|Y
01|212041|3|1|Req.INS/T/P Inspection Required|Y
01|212056|1|1|ROTARY TABLE HAS BUILT IN 6 PORT ROTARY JOINT|Y
01|212056|2|1|64MM HEIGHT RISER WITH CROSS DRILLED HOLES FOR THRU|Y
01|212056|2|2|SPINDLE HYDRAULICS FROM ROTARY JOINT|Y
01|212056|3|1|THIS INSTALLATION INCLUDES FULL ELECTRICAL INTEGRATION|Y
01|212056|3|2|AND TESTING OF ROTARY TABLE FUNCTIONALITY|Y
01|212056|3|3|PHYSICAL INSTALLATION AND MODIFICATION OF MACHINE|Y
01|212056|3|4|SHEET METAL ENCLOSURE WILL BE DONE BY TONER MACHINING|Y
01|212057|1|1|Pricing for 1-5pcs|Y
01|212057|3|1|Pricing for 6-9pcs|Y
01|212057|5|1|Priing for 10+ pcs|Y
01|212059|1|1|Net price reflects the purchase of 1 to 3 tools.|Y
01|212059|1|2|Delivery: L-N currently has 2 in stock and 6-pcs due|Y
01|212059|1|3|Beginning of March|Y
01|212059|5|1|Net price reflects the purchase of 1 to 3 tools.|Y
01|212059|5|2|Delivery: L-N currently has 5 in stock and balance of|Y
01|212059|5|3|5-pcs 2~3 Weeks.|Y
01|212067|1|1|Includes Haas motors and cable set|Y
01|212067|4|1|Adapter plate chuck to rotary table|Y
01|212067|6|1|Adapter for cylinder to rotary table|Y
01|212070|1|1|STANDARD START2 SHRINK FIT UNIT|Y
01|212070|2|1|STANDARD START2 SHRINK FIT UNIT WITH FOOT PEDAL|Y
01|212070|2|2|FOR CONTROL OF HEATING TO FREE UP A HAND|Y
01|212073|1|1|Qty Break Pricing:|Y
01|212073|1|2|Min. 30pcs ~ List $298.00ea/less 40%    $178.80ea/net|Y
01|212073|1|3|31-60pcs   ~ List $298.00ea/less 42%    $172.84ea/net|Y
01|212073|1|4|61-75pcs   ~ List $298.00ea/less 45%    $163.90ea/net|Y
01|212095|2|1|Please Note: The retention knob is non standard stock.|Y
01|212095|2|2|Once a purchase order is placed it cannot be cancelled|Y
01|212095|2|3|or returned.|Y
01|212101|2|1|if more than 4 are needed additional pieces must be|Y
01|212101|2|2|quoted from the factory and the pricing may be|Y
01|212101|2|3|different|Y
01|212113|1|1|20% OVERSTOCK Promotion Applied. This item cannot be|Y
01|212113|1|2|returned.|Y
01|212119|1|1|Replaces C40-4500(H)|Y
01|212126|5|1|BMT68 ER32Z MAIN/SUB LIVE TOOL|Y
01|212126|5|2|PART NUMBER = MZST68-ER32Z-MS-10K|Y
01|212126|5|3|MIMATIC # 189523|Y
01|212138|1|1|S20t-ECH7SR-50|Y
01|212138|2|1|XSP30|Y
01|212138|3|1|wrench for S20T-ECH7SR-50|Y
01|212144|1|1|Tool 9192|Y
01|212144|2|1|Tool 2264809093|Y
01|212144|3|1|Tool 4786|Y
01|212144|4|1|Tool 98|Y
01|212144|5|1|Tool 87|Y
01|212144|6|1|Tool 77|Y
01|212144|8|1|Tool 22|Y
01|212144|9|1|TOOL 47|Y
01|212144|10|1|Tool 64|Y
01|212144|11|1|Tool 80|Y
01|212144|12|1|Tool 86|Y
01|212144|13|1|Tool 9091|Y
01|212144|14|1|Tool 9293|Y
01|212144|15|1|Tool 98|Y
01|212144|16|1|Tool 87|Y
01|212144|17|1|Tool 77|Y
01|212144|19|1|Tool 77|Y
01|212144|20|1|TOOL 77|Y
01|212147|1|1|CROSS FROM KENNAMETAL SS050TT012600|Y
01|212147|2|1|CROSS FROM KENNAMETAL CAT50BER16600|Y
01|212160|1|1|5 pieces stock|Y
01|212160|1|2|3 pieces ETA mid march with an order by 2/27/24|Y
01|212160|1|3|additional stock 4wks for ETA mid april|Y
01|212179|1|1|RGA#LVR-60495/|Y
01|212179|1|2|Repair of MZMP5-ER40X-OFF-ICE s/n:19906106 02|Y
01|212179|1|3|(Mimatic#189966)|Y
01|212179|2|1|Bearings seals and o-rings to be replaced.|Y
01|212181|1|1|RGA#CUR-60506/|Y
01|212181|1|2|Repair of NC50RAM-C4-180EC-110CTP s/n:95370 01|Y
01|212181|1|3|(Mimatic#192351)|Y
01|212181|2|1|Bearings seals o-rings and CAPTO clamping mechanism|Y
01|212181|2|2|to be replaced.|Y
01|212181|4|1|RGA#CUR-60506/|Y
01|212181|4|2|Repair of NC50RAM-C4-180EC-110CTP s/n:19908329 01|Y
01|212181|4|3|(Mimatic#192351)|Y
01|212181|5|1|Bearings seals o-rings and CAPTO clamping mechanism|Y
01|212181|5|2|to be replaced.|Y
01|212204|1|1|#140|Y
01|212204|2|1|#145|Y
01|212204|3|1|#195|Y
01|212204|4|1|#370|Y
01|212210|1|1|Installation not inlcuded.|Y
01|212216|8|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|212222|1|1|Part # H63A-SF0312-6.30CP-IDI|Y
01|212222|1|2|HSK63A Shrink Fit Holder 5/16 CoolantPorts ChipHole 25k|Y
01|212222|1|3|With BIS-C-122-04/L (BIS0011) Installed|Y
01|212222|1|4|This is considered special once chip is installed this|Y
01|212222|1|5|cannot be cancelled or returned.|Y
01|212227|1|1|**Additional 20% discount added for OVERSTOCK promo|Y
01|212227|1|2|*Final Sale*|Y
01|212233|1|1|RMSS-3.8|Y
01|212233|3|1|RMSS-4.2|Y
01|212233|4|1|RMSS-4.8|Y
01|212233|5|1|RMSS-5.0|Y
01|212233|6|1|RMSS-5.2|Y
01|212233|7|1|RMSS-5.8|Y
01|212233|8|1|RMSS-6.0|Y
01|212233|9|1|RMSS-6.2|Y
01|212233|10|1|RMSS-6.8|Y
01|212233|11|1|RMSS-7.0|Y
01|212233|12|1|RMSS-7.2|Y
01|212233|13|1|RMSS-8.8|Y
01|212233|14|1|RMSS-9.0|Y
01|212233|15|1|RMSS-9.2|Y
01|212233|16|1|RMSS-9.8|Y
01|212233|17|1|RMSS-10.0|Y
01|212233|18|1|RMSS-10.2|Y
01|212233|19|1|PF-RMSS-10.8|Y
01|212233|20|1|PF-RMSS-11.0|Y
01|212233|21|1|PF-RMSS-11.2|Y
01|212233|22|1|PF-RMSS-11.8|Y
01|212233|24|1|PF-RMSS-12.2|Y
01|212233|25|1|PF-RMSS-12.8|Y
01|212233|26|1|PF-RMSS-13.0|Y
01|212233|27|1|PF-RMSS-13.2|Y
01|212233|28|1|PF-RMSS-13.8|Y
01|212233|29|1|PF-RMSS-14.0|Y
01|212233|30|1|PF-RMSS-14.2|Y
01|212233|31|1|PF-RMSS-14.8|Y
01|212233|32|1|PF-RMSS-15.0|Y
01|212233|33|1|PF-RMSS-15.2|Y
01|212233|34|1|PF-RMSS-15.8|Y
01|212233|35|1|PF-RMSS-16.0|Y
01|212233|36|1|PF-RMSS-16.2|Y
01|212233|37|1|PF-RMSS-16.8|Y
01|212233|38|1|PF-RMSS-17.0|Y
01|212233|39|1|PF-RMSS-17.2|Y
01|212233|40|1|PF-RMSS-17.8|Y
01|212233|41|1|PF-RMSS-18.0|Y
01|212233|42|1|PF-RMSS-18.2|Y
01|212233|43|1|PF-RMSS-18.8|Y
01|212233|44|1|PF-RMSS-19.0|Y
01|212233|45|1|PF-RMSS-19.2|Y
01|212233|46|1|PF-RMSS-19.8|Y
01|212233|47|1|PF-RMSS-20.0|Y
01|212233|48|1|PF-RMSS-20.2|Y
01|212237|1|1|Includes: Rotary table Nikken controller pendant with|Y
01|212237|1|2|with 15ft cable external cables power cable and|Y
01|212237|1|3|M-code cable.|Y
01|212237|2|1|Includes: Rotary table Nikken controller pendant with|Y
01|212237|2|2|15ft cable external cable power cable and M-code|Y
01|212237|2|3|cable.|Y
01|212238|1|1|20% Overstock Promotion applied. Once a PO has been|Y
01|212238|1|2|placed this item cannot be cancelled or returned.|Y
01|212243|1|1|All sales are final|Y
01|212243|2|1|All sales are final|Y
01|212249|1|1|*NET price|Y
01|212249|1|2|*Special- cannot be returned or cancelled|Y
01|212258|1|1|Part of 1st Batch/968264.|Y
01|212258|1|2|Already inspected 10p on 2/5.|Y
01|212258|2|1|1st Batch/969579|Y
01|212258|3|1|T/P Inspection Required|Y
01|212265|8|1|Final part#NCAT40-SK20C-180UP-IDU|Y
01|212275|5|1|20MM Hydraulic Replacement|Y
01|212275|6|1|20mm Hydraulic Replacement|Y
01|212278|1|1|All sales are final|Y
01|212282|1|1|Part # BT30-SF12-90 BT30 12mm Shrink Fit holder 90mm GL|Y
01|212292|1|1|CAT40-SF6-130CP|Y
01|212292|2|1|CAT40-SF8-130CP|Y
01|212292|3|1|CAT40-SF10-130CP|Y
01|212292|4|1|CAT40-SF12-130CP|Y
01|212292|5|1|CAT40-SF16-130CP|Y
01|212292|6|1|CAT40-SF20-130CP|Y
01|212298|1|1|RGA#LVR-60494/|Y
01|212298|1|2|Repair of MNL12-ER32Z-MS s/n:A0215 (Alps#T32216)|Y
01|212298|2|1|Bearings o-rings collet nut drive shaft and spindle|Y
01|212298|2|2|to be replaced.|Y
01|212298|4|1|RGA#LVR-60494/|Y
01|212298|4|2|Repair of MNL12-ER32Z-MS s/n:A0220 (Alps#T32216)|Y
01|212298|5|1|Bearings o-rings collet nut drive shaft and spindle|Y
01|212298|5|2|to be replaced.|Y
01|212298|7|1|RGA#LVR-60494/|Y
01|212298|7|2|Repair of MNL12-ER32Z-MS s/n:A0760 (Alps#T32216)|Y
01|212298|8|1|Bearings o-rings collet nut drive shaft and gears|Y
01|212298|8|2|to be replaced.|Y
01|212345|13|1|Replaces TQW-150|Y
01|212345|14|1|Replaces TQW-SK10(1)|Y
01|212345|15|1|Replaces TQW-SK16(43)|Y
01|212359|1|1|T/P Inspection Required|Y
01|212359|2|1|T/P Inspection Required|Y
01|212359|3|1|T/P Inspection Required|Y
01|212359|4|1|T/P Inspection Required|Y
01|212360|1|1|Qty 2pcs pricing $4215 NET each|Y
01|212383|5|1|8 pieces in stock|Y
01|212383|5|2|Additional stock mid April if ordered by 3/1|Y
01|212383|5|3|after 3/1. Additional stock is mid May|Y
01|212390|2|1|Special price: No tooling certs included|Y
01|212445|4|1|CAT40-SF5-80CP|Y
01|212446|1|1|1st Batch DWG saved in Teams File|Y
01|212446|2|1|1st Batch DWG saved in Teams File|Y
01|212449|1|1|FLASH SALE (extra 23% applied)|Y
01|212449|1|2|valid until 3/1/24|Y
01|212454|1|1|Once modification has begun this cannot be cancelled or|Y
01|212454|1|2|returned.|Y
01|212466|1|1|Nikken has stk 2wks lead time|Y
01|212468|1|1|1st Batch 10/12 Approved|Y
01|212468|2|1|1st Batch 10/12 Approved|Y
01|212468|3|1|1st Batch|Y
01|212468|4|1|1st Batch   7/19  approved|Y
01|212468|5|1|Req.INS/T/P Inspection Required|Y
01|212468|6|1|Req.INS/T/P Inspection Required|Y
01|212468|7|1|Req.INS/T/P Inspection Required|Y
01|212468|8|1|T/P Inspection Required|Y
01|212468|9|1|Req.INS/T/P Inspection Required|Y
01|212468|10|1|Req.INS/T/P Inspection Required|Y
01|212468|11|1|Req.INS/T/P Inspection Required|Y
01|212468|12|1|Req.INS/T/P Inspection Required|Y
01|212474|2|1|Extra 23% discount for flash sale - valid thru 3/1|Y
01|212478|4|1|Option #1 for NSK Head|Y
01|212478|5|1|Option #2 for NSK Head.|Y
01|212488|1|1|1st Batch|Y
01|212488|2|1|1st Batch|Y
01|212490|2|1|Quoted as an in stock alternative.|Y
01|212496|1|1|Part # HSK63A-ER11-160|Y
01|212496|1|2|HSK63A ER11 Collet Chuck  GL 160mm|Y
01|212496|3|1|part # HSK63A-ER11-160M|Y
01|212496|3|2|HSK63A ER11 Mini Collet Chuck  GL 160mm|Y
01|212503|4|1|These are speicals once ordered cannot be cancelled|Y
01|212503|4|2|or returned.|Y
01|212503|5|1|Nikken Stock alternative. These are specials and|Y
01|212503|5|2|cannot be cancelled or returned|Y
01|212509|5|1|P/N: E20-SET-9(C)-MM  5-13mm coolant collet|Y
01|212542|1|1|Includes motor and cable set.|Y
01|212543|8|1|This wrench body may be used on TQW-PS(13)|Y
01|212565|1|1|HSK63T-SLT16-100|Y
01|212610|1|1|This item is special once ordered cannont be cancelled|Y
01|212610|1|2|or returned.|Y
01|212621|1|1|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|212621|1|2|MODIFIED TOOL NON-CANCELABLE/NON-RETURNABLE AFTER|Y
01|212621|1|3|RECEIPT OF PO|Y
01|212621|5|1|DIRECT REPLACEMENT FOR C4017-0025-4.00|Y
01|212621|9|1|NET PRICE QUOTED NO FURTHER DISCOUNTS|Y
01|212621|9|2|MODIFIED TOOL NON-CANCELABLE/NON-RETURNABLE AFTER|Y
01|212621|9|3|RECEIPT OF PO|Y
01|212623|1|1|1st Batch  8/25/23 approved by Ben|Y
01|212623|2|1|1st Batch/T/P Inspection Required    12/6 approved|Y
01|212623|3|1|Req.INS/T/P Inspection Required|Y
01|212623|4|1|Req.INS/T/P INS & Install E32-NUT-G|Y
01|212623|5|1|Req.INS/T/P Inspection Required|Y
01|212623|6|1|Req.INS/T/P Inspection Required|Y
01|212655|1|1|RGA#QUA-60427/|Y
01|212655|1|2|Repair of C40-MRAM s/n:21907398 09 (Mimatic#162731)|Y
01|212655|2|1|Bearings seals and o-rings to be replaced.|Y
01|212658|1|1|RGA#QUA-60428/|Y
01|212658|1|2|Repair of C40-MRAM s/n:21907398 10 (Mimatic#162731)|Y
01|212658|2|1|Bearings seals and o-rings to be replaced.|Y
01|212693|8|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|212694|6|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|212695|8|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|212700|3|1|Labor cost for Converting/Testing OSP3 -> OSP4|Y
01|212702|1|1|Includes: Control box motor cables motor cover|Y
01|212702|1|2|motor gear gear box pendant with 15ft cable power|Y
01|212702|1|3|cable M-code cable|Y
01|212702|2|1|Labor 8 hours|Y
01|212715|2|1|Installation includes: Drive unit short bar fiber|Y
01|212715|2|2|optic cable communications cable bulkhead cables|Y
01|212715|2|3|external cables parameter changes service time and|Y
01|212715|2|4|travel.|Y
01|212718|1|1|CAT50 AGH Aluminium : 3 pins support|Y
01|212718|1|2|Coolant thru spindle Ext coolant thru pipe (30BAR)|Y
01|212718|1|3|Reversal Output; L235 1: Gear Max 150Nm; 3000RPM|Y
01|212718|1|4|Approx; 30KG|Y
01|212743|6|1|P/N: K1.1/4-SK10-120P|Y
01|212743|6|2|1.1/4 Straight Shank Extension Slim Chuck SK10 with|Y
01|212743|6|3|hi-speed nut|Y
01|212751|2|1|LN will manufacture upon receipt of Spindle Drawing|Y
01|212778|2|1|Quoted at Net price|Y
01|212780|1|1|final part# TBD|Y
01|212780|1|2|CAT50 ER40 Angle Head with 80mm Taper Pin|Y
01|212780|1|3|(similar to Mimatic# 178114)|Y
01|212780|1|4|QTY BREAK NET PRICING(each):  3pc minimum|Y
01|212788|1|1|All sales are final.|Y
01|212798|1|1|Additional 20% OVERSTOCK Promotion applied.|Y
01|212798|1|2|This item cannot be returned.|Y
01|212810|2|1|Order Part # CAT40-SF1000-3.94CP-DIN-M|Y
01|212810|5|1|Order part 2 C4001-0750-1.75CP-DIN-M|Y
01|212811|1|1|20% OVERSTOCK Promotion applied. This item cannot be|Y
01|212811|1|2|cancelled or returned upon receipt of PO.|Y
01|212818|2|1|HSK63F 1 Shell mill stubby with 2 GL|Y
01|212818|2|2|Part # HSK63F-SM1000-2.00|Y
01|212818|2|3|These are also special cannot be cancelled or returned|Y
01|212827|3|1|BRM-25.0|Y
01|212834|1|1|BMT75 STRT; C5 1:1 IntCoolant ExtCoolant|Y
01|212834|1|2|90mm Center Height; central Left-Right version|Y
01|212834|1|3|for Samsung SL4500|Y
01|212834|2|1|BMT75 90Deg; C5 90mm Center height|Y
01|212834|2|2|For Samsung SL4500|Y
01|212844|1|1|HSK25E-SK6-45P|Y
01|212844|1|2|These are considered special and cannot be cancelled|Y
01|212844|1|3|or returned.|Y
01|212844|2|1|HSK25E-SK6-45P|Y
01|212844|2|2|These are considered special and cannot be cancelled|Y
01|212844|2|3|or returned.|Y
01|212844|2|4|**DELIVERY: 5pcs 1-2 Wks ARO after 6/26 Bal ~16wks ARO|Y
01|212845|1|1|RGA#TOR-60496/|Y
01|212845|1|2|Repair of CAT50-UMT200|Y
01|212845|3|1|Calibration service included.|Y
01|212845|5|1|RGA#TOR-60496/|Y
01|212845|5|2|Repair of CAT50-UMT200|Y
01|212845|7|1|Calibration service included.|Y
01|212862|1|1|Tool 94: CV50-CKB5-83 626.151 - 75.015MM BORING BAR|Y
01|212862|2|1|Tool 95: CAT50# 6185-1692. 626.161 - 110MM BORING BAR|Y
01|212862|3|1|Tool97: 11.331.331 CKB3-CKB1-41310.111 - 25.03MM|Y
01|212862|3|2|boring bar|Y
01|212862|4|1|Tool 99: CV50-CKB5-83   626.151  - 62.015MM BORING BAR|Y
01|212870|1|1|For Siemens 840D|Y
01|212870|2|1|5C System - Air|Y
01|212870|3|1|Cables from 4th Axis to Bulkhead|Y
01|212888|1|1|1st Batch/963287 MachinerySys/Radiac 11/16:DWG APRVD|Y
01|212892|2|1|***EXTERNAL COOLANT ONLY***|Y
01|212892|3|1|***INTERNAL OR EXTERNAL COOLANT***|Y
01|212892|5|1|***INTERNAL OR EXTERNAL COOLANT + QUICK CHANGE***|Y
01|212893|1|1|Repair of customer's CNC200FA s/n: 9538|Y
01|212893|1|2|Reference RGA# T-45335|Y
01|212894|1|1|With SCALE: HEIDENHAIN RCN8591|Y
01|212894|1|2|NOTE: Angle plate and riser plate are not included.|Y
01|212894|1|3|Will be supplied them by Shibaura Machine.|Y
01|212894|1|4|Special Order. Cancellation is not allowed.|Y
01|212894|1|5|Production period is 1 year.|Y
01|212894|1|6|FOB Shibaura Gotemba Factory in JAPAN.|Y
01|212896|1|1|C6-SK6-150|Y
01|212896|2|1|C6-SK10-150|Y
01|212925|1|1|Replacement for TAT-250 SN:4022 RGA# 60523|Y
01|212928|1|1|PRE-E356PLUS-I40|Y
01|212938|9|1|*Lyndex-Nikken to make position block|Y
01|212938|9|2|Delivery is upon final confirmation|Y
01|212938|9|3|NET price|Y
01|212946|1|1|1st Batch/973798/Turner SPLY/Kimber Mfg. 3/7:DWG/Teams|Y
01|212946|2|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|212946|3|1|1st Batch/(1)972035 2/12:DWG saved in Teams File|Y
01|212946|4|1|1st Batch/(1)972035 2/12:DWG saved in Teams File|Y
01|212946|5|1|Req.INS/REPEAT 967138/MO Tool/Patriot|Y
01|212946|6|1|Req.INS/Install S7/16-20X3/8|Y
01|212954|1|1|5-6weeks MFG. + Shippng 2 weeks|Y
01|212954|1|2|Net Price Each.|Y
01|212966|1|1|This item is part of our overstock promotion and is|Y
01|212966|1|2|non-cancellable and non-returnable once a PO has been|Y
01|212966|1|3|placed|Y
01|212974|1|1|CAT50 Walter Adaptor|Y
01|212992|2|1|***EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES***|Y
01|212992|3|1|***BISON 3205 - 8 3 JAW CHUCK + ADAPTER PLATE***|Y
01|212999|2|1|Table with motor covermotor and amplifier not included|Y
01|213008|1|1|RGA#LVR-60534/|Y
01|213008|1|2|Repair of MNZ20-SK16Z-ICE-12K s/n:19904122 15|Y
01|213008|1|3|(Mimatic#193643)|Y
01|213008|2|1|Bearings seals o-rings and damaged spindle to be|Y
01|213008|2|2|replaced.|Y
01|213008|4|1|RGA#LVR-60534/|Y
01|213008|4|2|Repair of MNZ20-SK16X-ICE-12K s/n:20902425 02|Y
01|213008|4|3|(Mimatic#193568)|Y
01|213008|5|1|Bearings seals o-rings and damaged spindle to be|Y
01|213008|5|2|replaced.|Y
01|213008|7|1|RGA#LVR-60534/|Y
01|213008|7|2|Repair of MNZ20-SK16X-ICE-12K s/n:20905017 16|Y
01|213008|7|3|(Mimatic#193568)|Y
01|213008|8|1|Bearings seals and o-rings to be replaced.|Y
01|213033|1|1|For Rotary Axis of 5AX-4MT|Y
01|213033|2|1|For Tilting Axis of 5AX-4MT & CNC202|Y
01|213036|1|1|BT50-CZF25-165  quoted at NET price.|Y
01|213036|1|2|This item is considered special once ordered cannot be|Y
01|213036|1|3|cancelled or returned.|Y
01|213060|1|1|NON RETURNABLE|Y
01|213093|1|1|CAT40-PX10-160GX|Y
01|213097|1|1|Please Note: This item is considered special|Y
01|213097|1|2|non-standard stock. Once a PO is placed it cannot be|Y
01|213097|1|3|cancelled or returned.|Y
01|213098|1|1|Flash sale discount of additioanl 22% added to the|Y
01|213098|1|2|discount. Promo ends 3/15|Y
01|213098|3|1|Flash sale discount of additioanl 22% added to the|Y
01|213098|3|2|discount. Promo ends 3/15|Y
01|213106|8|1|**NET Price|Y
01|213106|8|2|LN to thread blank draw nut to match customer's|Y
01|213106|8|3|machine drawtube.|Y
01|213106|8|4|Delivery is 2-3 days upon receipt specs from customer|Y
01|213108|14|1|This item is a part of our Overstock Promo and is|Y
01|213108|14|2|non-cancellable and non-returnable once a PO has been|Y
01|213108|14|3|placed.|Y
01|213111|1|1|This tool has been quoted as NET price.|Y
01|213115|1|1|Non-cancellable non-returnable|Y
01|213158|1|1|HSK100A-SK16C-250|Y
01|213158|2|1|HSK100A-SK16C-300|Y
01|213158|3|1|HSK100A-SK20C-300|Y
01|213196|1|1|TOOL CERTIFICATE $10K face value $5K|Y
01|213205|1|1|Sn#  2J7049|Y
01|213205|1|2|*Demo unit- sold AS-IS*|Y
01|213205|1|3|6-month warranty from invoice date|Y
01|213205|1|4|*NET price|Y
01|213207|5|1|Brackets/Hardware/Cover for PBA tailstock for|Y
01|213207|5|2|confirmation swtiches|Y
01|213207|6|1|Chuck to Rotary Table Adapter Plate|Y
01|213207|6|2|Cylinder to Rotary Table Adapter Plate|Y
01|213207|6|3|Draw Rod to connect Chuck to Cylinder|Y
01|213220|2|1|CAT40 works on all but E410H model|Y
01|213220|3|1|CAT50 works on all but E500/650 model|Y
01|213220|21|1|BT30-TB1.1/4-6.00NF|Y
01|213220|21|2|BT30 Test Bar No Flange 1.1/4x6 w/ Wooden Case|Y
01|213220|22|1|CAT40-TB1.3/4-6.00NF|Y
01|213220|22|2|#40 Test Bar No Flange 1.3/4x6 w/ Wooden Case|Y
01|213220|23|1|HSK63A-TB1.3/4-6.00|Y
01|213220|23|2|HSK63A Test Bar 1.3/4x6 IdChipHole WoodenCase|Y
01|213220|24|1|C6-TB40-150|Y
01|213220|24|2|PSC C6 Test Bar 40mmx150mm w/ Wooden Case|Y
01|213220|25|1|C8-TB40-150|Y
01|213220|25|2|PSC C8 Test Bar 40mmx150mm|Y
01|213233|8|1|in lieu of BB Holder|Y
01|213251|1|1|These collets are non-standard stock items and|Y
01|213251|1|2|considered specials. Once a PO has been issued they|Y
01|213251|1|3|cannot be cancelled or returned.|Y
01|213251|2|1|These collets are non-standard stock items and|Y
01|213251|2|2|considered specials. Once a PO has been issued they|Y
01|213251|2|3|cannot be cancelled or returned.|Y
01|213260|1|1|Net price quoted includes modification of cutting|Y
01|213260|1|2|down the length 4(+/-0.1) from the face of the collet|Y
01|213260|1|3|2-3 days for modification|Y
01|213307|2|2|Fuji Live ER40Z<AXIAL>90D IntCool 5K CH58|Y
01|213307|2|3|GREASE SEAL UNIT|Y
01|213307|2|4|Delivery: 6Wks for Deisgn Time|Y
01|213307|2|5|14 wks MFG|Y
01|213307|2|6|1-2 wks shipping|Y
01|213307|2|7|`|N
01|213307|5|2|Fuji Live HYDRO FLEX QUICK CHANGE <Axial>90D IntCool|Y
01|213307|5|3|5K CH58|Y
01|213307|5|4|Delivery: 6wks for Design Time (from rcpt of PO)|Y
01|213307|5|5|14wks MFG (after drawing is signed)|Y
01|213307|5|6|1-2wks Shipping|Y
01|213307|6|2|Mimatic# 113134/ LN Final part# TBD|Y
01|213307|6|3|Hydroflex Clamping Sleeve 25/32-48|Y
01|213307|6|4|for HYDRO FLEX QC unit above|Y
01|213307|6|5|Delivery: 4pc in stock at factory (1-2wks)|Y
01|213307|6|6|Additional Qty - 8wks|Y
01|213322|2|1|Inspection/Bearings/Seals/O-Rings/General Brake items/|Y
01|213322|2|2|Worm Wheels/Worm Screws/Labor Included.|Y
01|213322|8|1|TAT-105N Repair Cost|Y
01|213322|8|2|Inspection/General Repair Items/Labor|Y
01|213330|1|1|ETA PENDING ON REMAINING PIECES|Y
01|213341|1|1|This is a non-standard stock item. Once a PO has been|Y
01|213341|1|2|issued it cannot be cancelled or returned.|Y
01|213378|1|1|PRE-E346BA-I40  Pre-Setter|Y
01|213378|12|1|PRE-SPDL-I50A|Y
01|213386|1|1|20% Overstock Promo applied. Once a PO is placed this|Y
01|213386|1|2|item cannot be cancelled or returned.|Y
01|213400|1|1|Mimatic# 194108 (LN final part# TBD)|Y
01|213400|1|2|Haas ST30Y|Y
01|213400|1|3|BMT65 ER32 Straight Live Tool|Y
01|213400|1|4|Gear Ratio 2:1|Y
01|213400|1|5|Quoted at NET price and minimum order of 2 tools is|Y
01|213400|1|6|required.|Y
01|213412|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|213412|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|213412|3|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|213412|4|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|213412|5|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|213412|6|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|213412|7|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|213412|8|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|213412|9|1|Req.INS/Install E40-NUT & ER40-SCREW(C)|Y
01|213413|1|1|Jaw nut for H01MA15 Lyndex-Nikken Part # TBD|Y
01|213413|1|2|QTY: 1 set (set of 3pc)|Y
01|213424|1|1|CNC300MA SN: 1522|Y
01|213425|1|1|P/N: HSK50A-SK10C-150P|Y
01|213442|4|1|TCE-A7088 Power cable for CNC202LFA|Y
01|213442|5|1|TCE-96743 Feedback cable for CNC202LFA|Y
01|213442|9|1|*Base plate by aluminum was supplied from the customer|Y
01|213442|9|2|last time|Y
01|213442|17|1|Air freight for CNC202 and parts|Y
01|213442|18|1|Air freight for 5AX-4MT and parts|Y
01|213444|1|1|This is a non-standard stock item. Once a PO has been|Y
01|213444|1|2|issued it cannot be cancelled or returned.|Y
01|213447|1|1|RGA#CUR-60345/|Y
01|213447|1|2|Repair of CAT50U-AHC1.1/4-210-90 s/n:ACB01765|Y
01|213447|13|1|Assembly calibration & testing|Y
01|213466|1|1|NON-STANDARD ITEM; NON-CANCELLABLE; NON-RETURNABLE|Y
01|213482|1|1|For CNC260FA-M  SN:9341C|Y
01|213495|1|1|RGA#TAR-60582 NSVZ300A21 SN: 2179H|Y
01|213497|1|1|Ref# H037M10|Y
01|213497|1|2|Includes: Std. Soft Jaws with bots hex wrench|Y
01|213497|1|3|**Draw nut is blank|Y
01|213497|1|4|**Draw nut supplied w/out thread - threading|Y
01|213497|1|5|available for additional fee.|Y
01|213497|2|1|LN will thread the draw nut upon receipt of|Y
01|213497|2|2|machine specs|Y
01|213511|2|1|Discount reflects a PO for 3~4 holders.|Y
01|213516|1|1|ref# H037M10|Y
01|213516|1|2|Includes: Std. Soft Jaws with bolts hex wrench|Y
01|213516|1|3|**draw nut is blank|Y
01|213516|3|1|LYN will thread the draw nut upon receipt of machine|Y
01|213516|3|2|specs|Y
01|213518|1|1|Promo FLASH SALE week 3/18/24-3/22/24|Y
01|213518|1|2|PO must be issued within this time|Y
01|213526|1|1|**Flash Sale special pricing valid until 3/22**|Y
01|213557|1|1|14.910.0.0212.0|Y
01|213557|2|1|14.910.0.0209.0|Y
01|213557|3|1|14.910.0.0208.0|Y
01|213557|4|1|14.101.0.0270.0|Y
01|213557|5|1|14.801.0.0122.0|Y
01|213557|6|1|14.910.0.0211.0|Y
01|213562|1|1|Includes cables.|Y
01|213563|2|1|THIS PRESETTER IS THE FINAL UNIT OF THIS SERIES.|Y
01|213563|2|2|THE DISCOUNT GRANTED IS BECAUSE THIS UNIT WAS|Y
01|213563|2|3|A SHOWROOM UNIT AND IS BEING OFFERED ON A FIRST|Y
01|213563|2|4|COME FIRST SERVE BASIS WITH A 1 YEAR WARRANTY|Y
01|213576|14|1|This item is a special and is non-cancellable and non|Y
01|213576|14|2|returnable once a PO has been placed.|Y
01|213576|26|1|**Not Coolant-Sealed|Y
01|213576|39|1|Cross with PG15X080H|Y
01|213576|40|1|Cross with PG15x120H|Y
01|213576|41|1|Cross with PG25x100|Y
01|213577|12|1|SK16 Slim Chuck Collet 3.0mm On Size Mechanical Coolant|Y
01|213580|1|1|1st Batch|Y
01|213580|2|1|1st Batch|Y
01|213580|3|1|1st Batch 12/6 Approved|Y
01|213580|4|1|T/P Inspection Required|Y
01|213600|1|1|This is considered special non-standard stock. Once|Y
01|213600|1|2|a PO has been placed it cannot be cancelled/returned.|Y
01|213600|2|1|Additional 20% Overstock Promotion discount applied.|Y
01|213600|2|2|This item cannot be cancelled or returned after receipt|Y
01|213600|2|3|of PO.|Y
01|213600|3|1|Additional 20% Overstock Promotion discount applied.|Y
01|213600|3|2|This item cannot be cancelled or returned after receipt|Y
01|213600|3|3|of PO.|Y
01|213600|4|1|Additional 20% discount only applies to line 2 & 3:|Y
01|213600|4|2|MZQT46-ER32X-OFF-C  MZQT46-ER32X-ICE|Y
01|213606|1|1|Quoted at NET Price for 1~9 toolholders.|Y
01|213606|2|1|Quoted at NET Price for 10+ toolholders.|Y
01|213607|1|1|*Additional 20% discount added for this item which|Y
01|213607|1|2|qualifies for OVERSTOCK Promo|Y
01|213607|1|3|*Final Sale|Y
01|213608|1|1|ADDITIONAL DISCOUNT HAS BEEN EXTENDED SINCE THIS|Y
01|213608|1|2|MODEL HAS BEEN DISCONTINUED.  ALTHOUGH IT IS NO|Y
01|213608|1|3|LONGER IN PRODUCTION PARTS WILL BE AVAILABLE FOR|Y
01|213608|1|4|10 YEARS AND THE UNIT HAS A 1 YEAR WARRANTY VERSUS|Y
01|213608|1|5|MANUFACTURER'S DEFECTS.|Y
01|213624|12|1|replaces part# SKN-10B|Y
01|213624|15|1|Replacement for C40-4500-EU|Y
01|213624|20|1|replaces SKN-6WB|Y
01|213632|3|1|Install 4th axis Interface on 2nd YMC Mill|Y
01|213632|3|2|Price reflects install being done one the same trip as|Y
01|213632|3|3|the New YMC.|Y
01|213644|1|1|**Overstock promo discount of 20% added|Y
01|213644|1|2|**Final Sale|Y
01|213645|1|1|Part# TBD|Y
01|213645|1|2|MAZK LIVE; 90DEG HEAD; PSC C5; L1-190mm; 1:1 GEAR MAX|Y
01|213645|1|3|150 Nm; 3000 RPM;|Y
01|213645|1|4|QTY BREAK NET PRICING:|Y
01|213645|1|5|2-4 pc: $14633ea/net|Y
01|213645|1|6|5pc+: $10389ea/net|Y
01|213653|1|1|**Overstock Promo discount of additional 20% added|Y
01|213653|1|2|**Final Sale|Y
01|213682|1|1|BT30-FMH22-47-45|Y
01|213682|1|2|BT30 Shell Mill Holder 22mm CoolantPorts|Y
01|213695|1|1|QCFC65-12-SER|Y
01|213706|2|1|Close-Out Deal once remaining 2 stk depleted price no|Y
01|213706|2|2|longer valid. Non-returnable and non-cancellable once|Y
01|213706|2|3|a PO has been placed.|Y
01|213711|2|1|1pc 2 weeksadditional May|Y
01|213711|2|2|*Non-standard stock non-cancellable/non-returnable|Y
01|213711|3|1|*Non-standard stock non-cancellable/non-returnable|Y
01|213711|4|1|HSK50E-SK6C-60P|Y
01|213711|4|2|*Non-standard stock non-cancellable/non-returnable|Y
01|213718|1|1|Engineering On-Site Inspection (Travel/1 Day Labor/Exp)|Y
01|213722|1|1|1st Batch|Y
01|213722|2|1|1st Batch|Y
01|213729|14|1|This item is a special and is non-cancellable and non|Y
01|213729|14|2|returnable once a PO has been placed.|Y
01|213729|26|1|**Not Coolant-Sealed|Y
01|213739|1|1|**Quoted at NET price.|Y
01|213739|1|2|Please note: This is special non-standard stock. Once|Y
01|213739|1|3|a PO is placed it cannot be cancelled or returned.|Y
01|213740|1|1|Includes cable sets.|Y
01|213740|2|1|Includes cable sets|Y
01|213775|1|1|Please Note: Once L-N laser marks collet it is|Y
01|213775|1|2|non-returnable. Customer part # CS865-191|Y
01|213790|4|1|Installation includes: Drive unit short bar fiber|Y
01|213790|4|2|optic cable communications cable bulkhead cables|Y
01|213790|4|3|external cables parameter changes service time and|Y
01|213790|4|4|travel.|Y
01|213791|5|1|*Discontinued once stock is depleted will be replaced|Y
01|213791|5|2|by -IDU variant|Y
01|213808|3|1|**Special this item is non-returnable and|Y
01|213808|3|2|non-cancellable once a PO has been placed.|Y
01|213810|1|1|Net pricing|Y
01|213812|14|1|This item is a special and is non-cancellable and non|Y
01|213812|14|2|returnable once a PO has been placed.|Y
01|213812|26|1|**Not Coolant-Sealed|Y
01|213828|1|1|1st Batch|Y
01|213831|1|1|5AX-350FA-M  SN: 3526|Y
01|213831|1|2|TAR-60619|Y
01|213831|35|1|REPLACEMENT TILT AXIS BODY|Y
01|213833|1|1|Special Discount Applied for Test. (Std. Disc 28%)|Y
01|213833|1|2|No returns will be accepted after the toolholder has be|Y
01|213833|1|3|used.|Y
01|213833|1|4|We cannot accept items returned after 60 days.|Y
01|213845|1|1|LCH1-SZF20-55-A|Y
01|213845|1|2|Straight Shank Extension 1 Slim Chuck Bulls Eye|Y
01|213845|1|3|ZeroZero SK20|Y
01|213845|3|1|LCH25-SZF20-55-A|Y
01|213845|3|2|Straight Shank Extension 25mm Slim Chuck Bulls Eye|Y
01|213845|3|3|ZeroZero|Y
01|213861|1|1|RGA#LVR-60587/|Y
01|213861|1|2|Repair of 173012 s/n:23821 01 (Mimatic#173012)|Y
01|213861|2|1|Bearings seals o-rings damaged housing damaged|Y
01|213861|2|2|spindle and 2 threadrings to be replaced.|Y
01|213861|4|1|RGA#LVR-60587/|Y
01|213861|4|2|Repair of 173012 s/n:23821 04 (Mimatic#173012)|Y
01|213861|5|1|Bearings seals o-rings and 1 threadring to be|Y
01|213861|5|2|replaced.|Y
01|213861|7|1|RGA#LVR-60587/|Y
01|213861|7|2|Repair of 173012 s/n:23821 05 (Mimatic#173012)|Y
01|213861|8|1|Bearings seals o-rings damaged housing damaged|Y
01|213861|8|2|spindle and 1 threadring to be replaced.|Y
01|213861|10|1|RGA#LVR-60587/|Y
01|213861|10|2|Repair of 173012 s/n:79546 03 (Mimatic#173012)|Y
01|213861|11|1|Bearings seals o-rings damaged housing damaged|Y
01|213861|11|2|spindle and 2 threadrings to be replaced.|Y
01|213864|1|1|Includes: External cable set.|Y
01|213866|1|1|LABOR COST TO CONVERT CNCZ180LSA-BR2 -> YA-BR SPEC|Y
01|213866|16|1|Switch box|Y
01|213873|1|1|Part # 5AX-350FA-RJ6|Y
01|213873|1|2|Replacement SN 3517|Y
01|213873|1|3|Table + Motors + Rotary Joint + Baseplate for Ship|Y
01|213873|1|4|** Includes core trade in discount **|Y
01|213883|3|1|Includes: Drive unit short bar fiber optic cables|Y
01|213883|3|2|communications cable bulkhead cables external cables|Y
01|213883|3|3|parmeter changes service time and travel.|Y
01|213897|1|1|Please note: This item is special non-standard stock.|Y
01|213897|1|2|Once a PO is placed it cannot be cancelled or returned|Y
01|213897|2|1|Please note: This item is special non-standard stock.|Y
01|213897|2|2|Once a PO is placed it cannot be cancelled or returned|Y
01|213913|1|1|Quoted 1~2-pc price.|Y
01|213913|2|1|Quoted 3~5-pc price.|Y
01|213916|1|1|Quoted 1~2-pc price.|Y
01|213916|2|1|Quoted 3~5-pc price.|Y
01|213922|1|1|**OVERSTOCK promo discount of 20% has been added|Y
01|213922|1|2|**Final Sale|Y
01|213923|1|1|5AX-2MT-105-120 SN: 8232|Y
01|213923|1|2|RGA#TAR-60595|Y
01|213962|1|1|Demo unit special pricing.|Y
01|213962|2|1|Includes: Dual axis drive short bar fiber optic cable|Y
01|213962|2|2|communications cable bulkhead cables external cables|Y
01|213962|2|3|parameter changes service time and travel .|Y
01|213964|3|1|BT40-SK20-75|Y
01|213964|3|2|BT40 Slim Chuck SK20 15K|Y
01|213966|1|1|HSK50 AGH; ER25; L=158mm;|Y
01|213966|1|2|1:1 GEAR MAX 25Nm; 6000 RPM;|Y
01|213966|1|3|COOLANT SUPPLY THRU SPINDLE EXTERNAL|Y
01|213966|1|4|COOLANT OVER PIPE;|Y
01|213966|1|5|Special Order Item. Order cancellations not accepted.|Y
01|213966|1|6|Delivery: 18-20weeks (DSN: 5-6wk MFG: 12-14wk) + Ship|Y
01|213967|1|1|NB50FHM-ER32-220IC-110TP|Y
01|213967|1|2|Dual Contact BT50 Angle Head ER32 110 tapered pin|Y
01|213967|1|3|Internal Coolant|Y
01|213967|1|4|Special Order. Order Cancelation Not Acceptable.|Y
01|213967|1|5|Delivery 18-20weeks (DGN 5wk MFG 12-14wk) + Ship|Y
01|213971|1|1|Test Purpos. Return Policy:|Y
01|213971|1|2|When returning the Tool holder please submit a report.|Y
01|213971|1|3|If L-N Engineer inspects it and finds any damage it|Y
01|213971|1|4|may not be returned.|Y
01|213971|1|5|We cannot accept items returned after 60 days.|Y
01|213976|1|1|OP10 Triag Fixture complete per concept drawing|Y
01|213976|1|2|TRI-1126 Op10 Triag fixture times 2 with 8-custom stop|Y
01|213976|1|3|blocks-For direct T-slot mounting.|Y
01|213987|22|1|HSK50A-VC6-70|Y
01|213987|23|1|HSK50A-VC6-90|Y
01|213987|24|1|HSK50A-VC6-120|Y
01|213987|26|1|HSK50A-VC13-120|Y
01|213987|28|1|HSK50A-MDSK6-70|Y
01|213987|29|1|HSK50A-MDSK6-90|Y
01|213987|33|1|HSK50A-MDSK13-90|Y
01|213987|34|1|HSK50A-MDSK16-115|Y
01|213997|1|1|HSK63A-MMC4C-116-AA|Y
01|213997|12|1|NET PRICE|Y
01|213997|13|1|NET PRICE|Y
01|213997|14|1|HSK63A-MMC8C-135-AT|Y
01|213997|14|2|NET PRICE|Y
01|213997|15|1|HSK63A-MMC8C-145-AA|Y
01|213997|15|2|NET PRICE|Y
01|213997|16|1|HSK63A-MMC8C-175-AA|Y
01|213997|16|2|NET PRICE|Y
01|213998|2|1|Addtional 20% Overstock Promo discount applied. Once a|Y
01|213998|2|2|PO is placed this item cannot be cancelled or returned|Y
01|213998|3|1|20% Overstock Promotion - Applied only to B50-4500|Y
01|214006|1|1|RGA#LVR-60557/|Y
01|214006|1|2|Repair of OKE4-ER40Z s/n:AL0081 (Alps#OKA01-14000)|Y
01|214006|2|1|Bearings o-rings collet nut spindle cover & spindle|Y
01|214006|2|2|to be replaced.|Y
01|214011|1|1|Please note: This item is special non-standard stock.|Y
01|214011|1|2|Once a PO is placed it cannot be cancelled or returned.|Y
01|214011|1|3|**Quoted at NET Price**|Y
01|214011|1|4|DELIVERY: 1 pc 1-2 Wks ARO/Bal 8-9 Wks ARO|Y
01|214011|5|1|Please note: This is special non-standard stock.|Y
01|214011|5|2|Once a PO is placed it cannot be cancelled or returned.|Y
01|214011|5|3|**Quoted at NET Price**|Y
01|214035|1|1|Pull Stud CAT40 5/8-11 90 pull stud for Mori Seiki|Y
01|214035|1|2|NH4000DCG and Mori Seiki Duracenter 5|Y
01|214036|1|1|This is the table with motor and short cable from|Y
01|214036|1|2|table sheet metal to junction box.|Y
01|214037|1|1|5AX-201FA-M SN: 4184|Y
01|214037|1|2|RGA#TAR-60626|Y
01|214048|1|1|REPLACEMENT FOR CNCZ180LYA-BR SN: 6011|Y
01|214048|1|2|INCLUDES: ROTARY TABLE + NEW MOTOR + NEW CABLE|Y
01|214062|6|1|BT50-SK6-135|Y
01|214062|13|1|BT50-RAC53-240|Y
01|214062|14|1|BT50-RAC53-210|Y
01|214062|15|1|BT50-RAC43-240|Y
01|214062|16|1|BT50-RAC100-290|Y
01|214062|20|1|BT50-SK20-165|Y
01|214062|23|1|BT50-Z8-105|Y
01|214062|28|1|BT50-MTA1-180|Y
01|214062|38|1|BT50-RAC130-285|Y
01|214062|39|1|BT50-RAC70-285|Y
01|214069|46|1|BT50-BAC130-235V|Y
01|214069|48|1|BT50-MTA1-180|Y
01|214069|50|1|BT50-RAC100-290|Y
01|214069|52|1|BT50-RAC130-235|Y
01|214069|54|1|BT50-RAC130-285|Y
01|214069|56|1|BT50-RAC43-240|Y
01|214069|58|1|BT50-RAC53-210|Y
01|214069|66|1|BT50-RAC70-285|Y
01|214069|68|1|BT50-SK6-135|Y
01|214069|70|1|BT50-SK10-195 discontinued alt. BT50-SK10-200|Y
01|214069|72|1|BT50-SK16-195 discontinued alt. BT50-SK16-200|Y
01|214069|74|1|BT50-SK20-165|Y
01|214069|77|1|BT50-Z8-105|Y
01|214069|79|1|BT50-ZMAC100-225V|Y
01|214069|81|1|BT50-ZMAC100-290V|Y
01|214070|3|1|TABLE WILL NEED HYDRAULIC PUMP FOR BRAKE|Y
01|214070|4|1|HYDRAULIC PUMP FOR 5AX-250YA-M TABLE|Y
01|214070|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|214078|1|1|RGA#QUA-60591/|Y
01|214078|1|2|Repair of MZQT46-ER25X-OFF-HSC s/n:75675 01|Y
01|214078|1|3|(Mimatic#124345)|Y
01|214078|2|1|Bearings seals and o-rings to be replaced.|Y
01|214078|2|2|This is the reduced price as a one-time courtesy.|Y
01|214114|1|1|2-pcs 14~15 Weeks ARO|Y
01|214137|1|1|Please note: This item is special non-standard stock.|Y
01|214137|1|2|Once a PO is placed it cannot be cancelled or returned.|Y
01|214137|2|1|Please note: This item is special non-standard stock.|Y
01|214137|2|2|Once a PO is placed it cannot be cancelled or returned|Y
01|214141|1|1|Overstock Promotion - Additional 20% discount has been|Y
01|214141|1|2|applied. Once a PO is placed this item cannot be|Y
01|214141|1|3|cancelled or returned.|Y
01|214141|2|1|Additional 20% applied to: C5027-0040-8.00DIN|Y
01|214143|1|1|Includes: Table with motor controller power cable|Y
01|214143|1|2|pendant with 15ft cable M-code cable.|Y
01|214143|2|1|Includes: Table with motor controller power cable|Y
01|214143|2|2|pendant with 15ft cable M-code cable.|Y
01|214143|3|1|Installation includes M-code connection and cable|Y
01|214143|3|2|management.|Y
01|214144|2|1|This quote does not include labor/installation|Y
01|214144|3|1|IND RT Joint Mt adaptorplate/chuck testing|Y
01|214150|1|1|BT50-HC6-160|Y
01|214150|1|2|BT50 Hydraulic Chuck 6mm GL:160mm|Y
01|214150|2|1|BT50-HC10-160|Y
01|214150|2|2|BT50 Hydraulic Chuck 10mm GL:160mm|Y
01|214167|1|1|STANDARD LIST PRICE IS $21800 BUT WE HAVE DECIDED|Y
01|214167|1|2|TO SPLIT THE DIFFERENCE.|Y
01|214170|1|1|1st Batch|Y
01|214171|18|1|A tariff surcharge of 8% will be added to every order|Y
01|214171|18|2|placed after September 1st 2025(until further notice).|Y
01|214171|18|3|This surcharge will be acknowledged upon acceptance|Y
01|214171|18|4|of every order.|Y
01|214175|1|1|Lyndex-Nikken Part #TBD / Mimatic Part #196452|Y
01|214175|1|2|1:2 Gear; Max 12000 RPM; 3 Nm; External Coolant|Y
01|214175|1|3|Nakamura WY100 Reference drawing 60202|Y
01|214175|1|4|QUOTED AT NET PRICE|Y
01|214178|1|1|**Quoted at NET Price**|Y
01|214178|1|2|This item is non-standard stock. Once a PO is placed|Y
01|214178|1|3|it cannot be cancelled or returned.|Y
01|214208|1|1|LN Part# NBT30-SF6-90CP  **QUOTED AT NET PRICE**|Y
01|214208|1|2|Taper Plus BT30 6mm Shrink Fit Holder w/ Coolant Ports|Y
01|214208|1|3|90mm GL|Y
01|214208|1|4|Please note: This item is non-standard stock. Once a PO|Y
01|214208|1|5|is placed it cannot be cancelled or returned.|Y
01|214208|1|6|DELIVERY: Mid May for order placed before 4/30|Y
01|214208|2|1|**QUOTED AT NET PRICE** Please note: this is special|Y
01|214208|2|2|non-standard stock. Once a PO is placed it cannot be|Y
01|214208|2|3|cancelled or returned.|Y
01|214208|2|4|DELIVERY: Mid-May for order placed before 4/30|Y
01|214214|1|1|P/N: BT40-TB40-300|Y
01|214214|1|2|BT40 Test Bar 300mm|Y
01|214214|2|1|P/N: PS-881|Y
01|214214|2|2|Pull stud for above|Y
01|214214|2|3|Machine: Makino A40 Pull Studs type NMTZ5001-PSB-25|Y
01|214214|2|4|Pull Stud included in above price as assembly.|Y
01|214214|3|1|P/N: BT30-TB40-300|Y
01|214214|3|2|BT30 Test Bar 300mm|Y
01|214214|4|1|P/N: PS-876|Y
01|214214|4|2|Pull Stud for above Machine: Mazak UN600-30H|Y
01|214214|4|3|Pull Studs type NSTZ5001- S/PSB-30P-F7|Y
01|214214|4|4|Pull Stud included in above price as assembly.|Y
01|214225|3|1|Overstock promo discount|Y
01|214237|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|214249|1|1|E346N special discount while supplies last|Y
01|214264|22|1|HSK63 TAPER POTS|Y
01|214266|1|1|Additional 20% Overstock Promotion discount applied.|Y
01|214266|1|2|Once a PO is placed this item cannot be cancelled or|Y
01|214266|1|3|returned.|Y
01|214266|2|1|20% Overstock Promotion - Applied to B3007-0008-2.00|Y
01|214266|2|2|only|Y
01|214269|1|1|NSVX400MA SN:2080|Y
01|214269|1|2|RGA#TAR-60648|Y
01|214274|1|1|Back Order 5-Pcs 3-4 Weeks ARO|Y
01|214278|1|1|Req.INS/Install S9/16-18X1/2|Y
01|214278|2|1|1st Batch|Y
01|214278|3|1|Req.INS/Install S3/4-16X11/16|Y
01|214278|4|1|Req.INS/Install S3/4-16X11/16|Y
01|214278|5|1|Req.INS/Check Set Screw is installed.|Y
01|214278|6|1|Req.INS/Check Set Screw is installed./REPEAT Holder|Y
01|214293|6|1|Overstock - Extra 20% discount|Y
01|214317|1|1|AIR #LY-2685 Billing Error|Y
01|214317|1|2|4/8/24RY:CR#LY-2685C-1(Will FW to Jim after OB Rcpt)|Y
01|214321|1|1|THIS LENGTH HOLDER DOES NOT HAVE A SAFETY RECESS FOR|Y
01|214321|1|2|TOOL CHANGE ARM. CAN BE AN ISSUE IF MACHINE HAS AN|Y
01|214321|1|3|ANSI STANDARD SPINDLE DESIGN|Y
01|214321|2|1|THIS TOOL DOES HAVE THE ANSI SAFETY RECESS|Y
01|214344|1|1|INCLUDES PURCHASE AND REBUILD OF USED MOTOR|Y
01|214344|1|2|SGMG-20A2AA MOTOR - DELIVERY PENDING ON THIS|Y
01|214344|1|3|ESTIMATE AROUND 2-4 WEEKS TURNAROUND|Y
01|214344|3|1|USE ORIGINAL MOTOR FROM CNC321YA SN: 6731|Y
01|214344|3|2|CUSTOMER HAS TO SEND IN ORIGINAL TABLE FOR US TO SWAP|Y
01|214344|3|3|DELIVERY: AROUND 1-2 WEEKS|Y
01|214350|1|1|Alt for B35-4500|Y
01|214352|1|1|Special Net Pricing for Lab Usage|Y
01|214352|1|2|Includes cables from table to cabinet.|Y
01|214357|1|1|Additional 20% Overstock Promo discount applied.|Y
01|214357|1|2|Please note: Once a PO is placed this item cannot be|Y
01|214357|1|3|cancelled or returned.|Y
01|214357|2|1|20% Overstock Promotion - Applied to|Y
01|214357|2|2|HSK63A-TC0875-6.38(C)|Y
01|214366|26|1|HSK63A-SK13-70P|Y
01|214366|27|1|HSK63A-SK13-90P|Y
01|214366|28|1|HSK63A-SK13-105P|Y
01|214366|30|1|HSK63A-SK13C-150P|Y
01|214366|71|1|HSK63A-SK20-90P|Y
01|214366|74|1|HSK63A-SK20C-135P|Y
01|214368|1|1|E346+ TABLETOP PRESETTER W/ C40 SPINDLE INSTALLED|Y
01|214368|2|1|CAT50 SPINDLE FOR 346+ PRESETTER|Y
01|214368|3|1|8 HOURS INSTALLATION AND TRAINING INCLUDED AT|Y
01|214368|3|2|NO COST TO ASSOCIATED METALCAST|Y
01|214369|3|1|8 HOURS FOR INSTALLATION AND TRAINING INCLUDED AT|Y
01|214369|3|2|NO COST TO ASSOCIATED METALCAST|Y
01|214384|1|1|P/N: BT40-TB40-300|Y
01|214384|1|2|BT40 Test Bar 300mm|Y
01|214384|2|1|P/N: PS-881|Y
01|214384|2|2|Pull stud for above|Y
01|214384|2|3|Machine: Makino A40 Pull Studs type NMTZ5001-PSB-25|Y
01|214384|2|4|Pull Stud included in above price as assembly.|Y
01|214384|3|1|P/N: BT30-TB40-300|Y
01|214384|3|2|BT30 Test Bar 300mm|Y
01|214384|4|1|P/N: PS-876|Y
01|214384|4|2|Pull Stud for above Machine: Mazak UN600-30H|Y
01|214384|4|3|Pull Studs type NSTZ5001- S/PSB-30P-F7|Y
01|214384|4|4|Pull Stud included in above price as assembly.|Y
01|214387|4|1|3-5 days from when the design is completed|Y
01|214395|1|1|NC5007-0032-8.00BN|Y
01|214395|1|2|NCAT50 Dual Contact ER32 Collet Chuck with Spanner Nut|Y
01|214395|1|3|Installed.|Y
01|214395|1|4|Please Note: This chuck has been modified with a|Y
01|214395|1|5|ER32 spanner nut. Once an order is placed it cannot be|Y
01|214395|1|6|cancelled or returned.|Y
01|214395|1|7|e|N
01|214395|1|8|f|N
01|214427|1|1|RGA#CUR-60608/|Y
01|214427|1|2|Repair of C50RAM-ER32-180-110TP s/n:19904361 01|Y
01|214427|1|3|(Mimatic#178111)|Y
01|214427|2|1|Bearings seals o-rings and back cover to be replaced.|Y
01|214427|4|1|RGA#CUR-60608/|Y
01|214427|4|2|Repair of C50RAM-ER32-180-110TP s/n:20906274 03|Y
01|214427|4|3|(Mimatic#178111)|Y
01|214427|5|1|Bearings seals and o-rings to be replaced.|Y
01|214451|1|1|Howa part # ORC63x1200-M-L|Y
01|214451|1|2|Howa Rodless Cylinder - Item NET Weight: 20kg (44 LBS)|Y
01|214451|1|3|This item is considered special once ordered it cannot|Y
01|214451|1|4|be cancelled or returned.|Y
01|214451|1|5|Quoted at NET pricing|Y
01|214455|1|1|E236+ PRESETTER WITH CAT40 SPINDLE INSTALLED|Y
01|214455|3|1|8 HOURS FOR INSTALLATION AND TRAINING INCLUDED AT|Y
01|214455|3|2|NO COST TO ASSOCIATED METALCAST|Y
01|214472|1|1|BT30-TB40-300 BT30 Test Bar 40x300mm w/PS-132 installed|Y
01|214472|1|2|into testbar. Please note BT30-TB40-300 is special.|Y
01|214472|1|3|Once a purchase order is placed it cannot be cancelled.|Y
01|214472|2|1|Installed with BT30-TB40-300 at factory. Must be|Y
01|214472|2|2|present on PO.|Y
01|214472|3|1|BT30-TB40-150  BT30 Test Bar 40x150mm PS-132 installed|Y
01|214472|3|2|into testbar. Please note BT30-TB40-150 is special.|Y
01|214472|3|3|Once a purchase order is placed it cannot be cancelled.|Y
01|214472|4|1|Installed with BT30-TB40-150 at factory. Must be|Y
01|214472|4|2|present on PO.|Y
01|214507|1|1|Part# TBD|Y
01|214507|1|2|BT50 AGH; ER25; COOLANT SUPPLY THRU SPINDLE AND COOLANT|Y
01|214507|1|3|PIPES; [70BAR] L=410mm; L1=300mm; 1:1 GEAR; MAX 30Nm;|Y
01|214507|1|4|8000RPM|Y
01|214507|1|5|QTY BREAK NET PRICING:|Y
01|214507|1|6|1 pc: $23000 ea/NET|Y
01|214507|1|7|2 pc: $18040 ea/NET|Y
01|214507|1|8|3+ pcs: $15455 ea/NET|Y
01|214507|10|1|Quoted at NET Price|Y
01|214507|10|2|Delivery = 3-5 Days after design is complete and angle|Y
01|214507|10|3|head is shipped.|Y
01|214508|3|1|3 pieces ETA 6/13 balance 3mths MFG + 1-2wks shipping|Y
01|214524|1|1|This Price is a Special Price with the following|Y
01|214524|1|2|per our discussion.We will need the table back to our|Y
01|214524|1|3|Home Office in IL as a core.|Y
01|214524|1|4|YAMAZEN has agreeded to pass along additional discount|Y
01|214525|1|1|List Price is 62350.00. selling price to Miller is|Y
01|214525|1|2|$52997.50|Y
01|214525|2|1|The 4th and 5th axis Amps in the machine can be used|Y
01|214525|2|2|with our table.|Y
01|214525|2|3|This is a Net Price to AFI and the Customer.|Y
01|214532|5|1|Quoted at NET price.|Y
01|214532|11|1|Quoted at NET price.|Y
01|214537|1|1|1st Batch|Y
01|214556|1|1|Additonal 20% overstock promotional discount has been|Y
01|214556|1|2|applied...please note once the PO is placed that this|Y
01|214556|1|3|item cannot be cancelled or returned.|Y
01|214556|2|1|20% overstock promotion applied only to|Y
01|214556|2|2|NC4047-0020-9.00.|Y
01|214559|1|1|Price is for the table body only. L/N will reuse the|Y
01|214559|1|2|motor and cover from the existing table.|Y
01|214584|1|1|RGA#TOR-60732/|Y
01|214584|1|2|Repair of C5005-1375-8.34(C)|Y
01|214595|3|1|Installation Charge|Y
01|214597|2|1|Delivery = 3-5 days after design is complete|Y
01|214621|1|1|1st Batch 12/8:DWG Approved/TR|Y
01|214621|2|1|Req.INS/T/P Inspection Required|Y
01|214632|1|1|Matched S/n 15751|Y
01|214643|1|1|RGA#TOR-60671/|Y
01|214643|1|2|Repair of PF-2|Y
01|214643|4|1|Calibration service included|Y
01|214643|6|1|RGA#TOR-60671/|Y
01|214643|6|2|Repair of PF-2|Y
01|214643|8|1|Calibration service included|Y
01|214643|10|1|RGA#TOR-60671/|Y
01|214643|10|2|Repair of PF-2|Y
01|214643|13|1|Calibration service included|Y
01|214654|5|1|NBT40-SK6C-60P-J|Y
01|214654|5|2|NBT40 DualContact Slim Chuck SK6 Coolant High Speed 30K|Y
01|214654|5|3|G2.5 with coolant nut installed|Y
01|214654|36|1|NBT40-SK10C-60P-J|Y
01|214654|36|2|NBT40 DualContact Slim Chuck SK10 Coolant High Spd 30K|Y
01|214654|36|3|G2.5 with coolant nut installed|Y
01|214654|58|1|NBT40-SK16C-60P-J|Y
01|214654|58|2|NBT40 DualContact Slim Chuck SK16 Coolant High Speed|Y
01|214654|58|3|G2.5 with Coolant Nut Installed|Y
01|214654|61|1|NBT40-SK16C-60P-J|Y
01|214654|61|2|NBT40 DualContact Slim Chuck SK16 Coolant High Spd 25K|Y
01|214654|61|3|G2.5 with coolant nut installed|Y
01|214675|3|1|Includes: Drive unit short bar fiber optic cable|Y
01|214675|3|2|bulkhead cables and external cables.|Y
01|214686|1|1|BMT65-ER32Z-MS-ICE|Y
01|214686|1|2|BMT65 LIVE Live ER32 Z<Axial>90D MainSub1+1|Y
01|214686|1|3|Internal /External Coolant 7MP|Y
01|214686|1|4|Quoted as 2+ tools. NET price.|Y
01|214702|1|1|RGA#TOR-60663/|Y
01|214702|1|2|Repair of PRE-PART-05PANR|Y
01|214711|8|1|Final Part# H10ARAM-ER25-225STEC-110TP|Y
01|214711|8|2|HSK100A AngleHead ER25 SLIM ExtCool 110mmPitch TaperPin|Y
01|214720|1|1|for T300-XM100DE-8-32 C110|Y
01|214720|1|2|For M4 DIN Tap|Y
01|214720|3|1|for 460.1-0350-018A1-XM GC34|Y
01|214720|3|2|drawing calls out 6mm shank for the drill|Y
01|214720|5|1|for T200-XM100AA-M4     C110|Y
01|214720|5|2|#8/ US/ANSI Tap|Y
01|214720|7|1|for 460.1-0330-017A1-XM GC34|Y
01|214720|7|2|Drawing calls out 6mm shank for the drill|Y
01|214720|9|1|for 8mm shank (no tool listed)|Y
01|214721|1|1|21pcs Stk- 22pcs 4wks - Balance Mid-June|Y
01|214724|1|1|T/P Inspection Required|Y
01|214724|2|1|T/P Inspection Required|Y
01|214724|3|1|T/P Inspection Required|Y
01|214724|4|1|T/P Inspection Required|Y
01|214724|5|1|T/P Inspection Required|Y
01|214724|6|1|T/P Inspection Required|Y
01|214724|7|1|T/P Inspection Required|Y
01|214730|1|1|Quoted at NET price.|Y
01|214739|1|1|Includes cable set.|Y
01|214742|1|1|AC003007 RFID BIS-C-122-04/L installed and holder|Y
01|214742|1|2|re-balanced. Holder and packaging etched with AC003007|Y
01|214742|2|1|AC003009 RFID BIS-C-122-04/L installed and holder|Y
01|214742|2|2|re-balanced. Holder and packaging etched with AC003009|Y
01|214742|3|1|AC003013 RFID BIS-C-122-04/L installed and holder|Y
01|214742|3|2|re-balanced. Holder and packaging etched with AC003013|Y
01|214742|4|1|AC003017 RFID BIS-C-122-04/L installed and holder|Y
01|214742|4|2|re-balanced. Holder and packaging etched with AC003017|Y
01|214742|5|1|AC003005 RFID BIS-C-122-04/L installed and holder|Y
01|214742|5|2|re-balanced. Holder and packaging etched with AC003005|Y
01|214749|1|1|Req.INS/Install S9/16-18X1/2|Y
01|214749|2|1|Req.INS/Install S5/8-18X1/2|Y
01|214749|3|1|Req.INS/Install S3/4-16X11/16|Y
01|214749|4|1|Req.INS/Make sure this is Taperplus Taper|Y
01|214749|4|2|Part# in PL was CAT50-SF0250-3.15CP.|Y
01|214749|5|1|Req.INS/Repaired.Ref.NCR389-1|Y
01|214749|6|1|Req.INS/Check Set Screw is installed.|Y
01|214750|1|1|Part# TBD  **Quoted at NET Price**|Y
01|214750|1|2|CAT40 to CAPTO6 Adapter|Y
01|214750|1|3|Please allow 1-2 Wks for design time from receipt of PO|Y
01|214750|1|4|Once approval drawing is signed expect 10-12 Weeks for|Y
01|214750|1|5|manufacturing and shipping.|Y
01|214750|1|6|Please note this is special non-standard item. Once|Y
01|214750|1|7|a PO is placed it cannot be cancelled or returned.|Y
01|214750|1|8|No quantity breaks available.|Y
01|214757|1|1|Part#: RNS-12.1F   **Quoted at NET Price**|Y
01|214757|1|2|Right Hand Helical for Blind Hole 12.1 mm NC Sensor|Y
01|214757|1|3|Reamer|Y
01|214757|1|4|QTY BREAK NET PRICING:|Y
01|214757|1|5|1-2 pcs: $390.00 ea/net|Y
01|214757|1|6|3-4 pcs: $376.00 ea/net|Y
01|214757|1|7|5-9 pcs: $360.00 ea/net|Y
01|214757|1|8|10+ pcs: $346.00 ea/net|Y
01|214764|6|1|BT50-SK6-135|Y
01|214764|14|1|BT50-RAC53-240|Y
01|214764|15|1|BT50-RAC53-210|Y
01|214764|16|1|BT50-RAC43-240|Y
01|214764|17|1|BT50-RAC100-290|Y
01|214764|18|1|BT50-ZMAC42-240V|Y
01|214764|19|1|BT50-ZMAC55-210|Y
01|214764|21|1|BT50-SK20-165|Y
01|214764|24|1|BT50-Z8-105|Y
01|214764|36|1|BT50-MTA1-180|Y
01|214764|38|1|BT50-MTA1-180|Y
01|214764|39|1|BT50-SK16-195 disc.|Y
01|214764|40|1|BT50-SK6-195 disc.|Y
01|214764|41|1|BT50-SK10-195 disc.|Y
01|214764|42|1|BT50-SK16-195 disc.|Y
01|214764|43|1|BT50-SK6-195 disc.|Y
01|214764|49|1|BT50-RAC130-285|Y
01|214764|50|1|BT50-RAC70-285|Y
01|214764|51|1|BT50-RAC70-285|Y
01|214764|52|1|BT50-RAC100-290|Y
01|214764|53|1|BT50-RAC130-285|Y
01|214764|54|1|BT50-RAC130-285|Y
01|214764|55|1|BT50-ZMAC70-300V|Y
01|214764|56|1|BT50-ZMAC70-300V|Y
01|214764|57|1|BT50-ZMAC100-225V|Y
01|214764|58|1|BT50-ZMAC100-290V|Y
01|214764|59|1|BT50-ZMAC100-225V|Y
01|214764|60|1|BT50-ZMAC140-315V disc.altBT50-ZMAC140-325V|Y
01|214764|61|1|BT50-ZMAC140-225V|Y
01|214764|70|1|BT50-RAC-100-290|Y
01|214764|72|1|BT50-RAC-70-285|Y
01|214764|73|1|BT50-RAC-70-285|Y
01|214764|74|1|BT50-RAC-100-290|Y
01|214764|75|1|BT50-RAC130-235|Y
01|214764|76|1|BT50-ZMAC100-290|Y
01|214764|77|1|BT50-ZMAC100-290|Y
01|214764|78|1|BT50-ZMAC70-300V|Y
01|214764|79|1|BT50-ZMAC70-300V|Y
01|214764|80|1|BT50-ZMAC100-290|Y
01|214764|81|1|BT50-BAC130-235|Y
01|214764|82|1|BT50-SK6-195 disc. --> alt. BT50-SK6-200|Y
01|214764|83|1|BT50-SK10-195 desc. --->alt. BT50-SK10-200|Y
01|214764|84|1|BT50-SK10-195 disc. --> alt. BT50-SK10-200|Y
01|214765|1|1|RGA#LVR-60681/|Y
01|214765|1|2|Repair of MNZ20-ER32X s/n:A0178 (Alps#T32475)|Y
01|214765|2|1|Bearings o-rings collet nut and spindle to be|Y
01|214765|2|2|replaced.|Y
01|214800|1|1|Triumph #SG-1434378|Y
01|214816|1|1|insert size (VNMG332)|Y
01|214829|1|1|Okuma Live; VDI40; Drive Length 93mm; 90 Degree Head|Y
01|214829|1|2|Lefthand|Y
01|214829|1|3|ER32; L1=70mm;|Y
01|214829|1|4|External Coolant Tool|Y
01|214829|1|5|1:2 Gear Max 13000RPM; 25Nm;|Y
01|214829|1|6|Wrenches: #112900 and #107642|Y
01|214829|1|7|Ref Drwg # 00063252|Y
01|214829|1|8|Delivery:1-2 weeks for design time from receipt of PO.|Y
01|214829|1|9|Once approval drawing signed expect 5-6 wks for|Y
01|214829|1|10|manufacturing and shipping.|Y
01|214829|2|1|Okuma Live; VDI40; Drive Length 93mm; 90 Degree Head|Y
01|214829|2|2|Lefthand|Y
01|214829|2|3|ER32; L1=70mm|Y
01|214829|2|4|Internal/External Coolant|Y
01|214829|2|5|1:2 Gear Max 13000RPM; 25Nm;|Y
01|214829|2|6|Wrenches: #112900 and#107642|Y
01|214829|2|7|Ref Drwg # 00063252|Y
01|214829|2|8|Delivery:1-2 weeks for design time from receipt of PO.|Y
01|214829|2|9|Once approval drawing signed expect 5-6 wks for|Y
01|214829|2|10|manufacturing and shipping.|Y
01|214829|6|1|Okuma Live; VDI40; Drive Length 93mm; 90 Degree Head|Y
01|214829|6|2|Lefthand|Y
01|214829|6|3|ER16; L1=90mm;|Y
01|214829|6|4|External Coolant|Y
01|214829|6|5|1:3 Gear Max 18000RPM; 10Nm;|Y
01|214829|6|6|Wrenches: #112900 and #107642|Y
01|214829|6|7|Ref Drwg # 00061517|Y
01|214829|6|8|**Has a Minimum Order Quantity of 2 pcs|Y
01|214829|6|9|Delivery:1-2 weeks for design time from receipt of PO.|Y
01|214829|6|10|Once approval drawing signed expect 13-14 wks mfg+ship|Y
01|214832|1|1|1st Batch *DWG Saved in Teams File.|Y
01|214834|1|1|Quoted at NET pricing|Y
01|214853|3|1|Includes Power and Feed Back Cables from Nikken Table|Y
01|214853|3|2|to Machine Bulk head 4th axis interface and complete|Y
01|214853|3|3|factory installation|Y
01|214859|1|1|DC24V OFF CLAMP AIR BRAKE|Y
01|214859|5|1|Installation includes: Drive unit short bar fiber|Y
01|214859|5|2|optic cable communications cable bulkhead cables|Y
01|214859|5|3|external cables parmeter changes  service time and|Y
01|214859|5|4|travel.|Y
01|214865|2|1|POLY WRAPPED EXTERNAL POWER & FEEDBACK CABLES FOR|Y
01|214865|2|2|4TH & 5TH AXES ON OKUMA M560V|Y
01|214865|5|1|ROTARY JOINT WILL ENABLE USE OF THRU SPINDLE AIR OR|Y
01|214865|5|2|HYDRAULICS FOR VISES/WORKHOLDING|Y
01|214869|1|1|Additional 20% Overstock Promotion discount applied.|Y
01|214869|1|2|Once a PO is placed this item cannot be cancelled or|Y
01|214869|1|3|returned.|Y
01|214869|2|1|20% Overstock Promotion sale applied to|Y
01|214869|2|2|MZQT47-ER25-AD-HS only.|Y
01|214892|1|1|SF18.63A.120|Y
01|214892|2|1|SF18.63A.095|Y
01|214892|3|1|SF10.63A.120.3|Y
01|214892|4|1|SF08.63A.120.3|Y
01|214892|5|1|SF32.63A.120|Y
01|214892|6|1|SF10.63A.085.3|Y
01|214892|7|1|SF06.63A.120|Y
01|214892|8|1|SF04.63A.160|Y
01|214892|9|1|SF32.63A.085|Y
01|214905|1|1|RGA#LVR-60696/|Y
01|214905|1|2|Repair of BMT65-ER32X s/n:7712160 (Mimatic#186489)|Y
01|214905|2|1|Bearings seals and o-rings to be replaced.|Y
01|214907|1|1|HSK40A-FMA25.4-50|Y
01|214907|1|2|HSK40A Shell Mill Holder 1|Y
01|214908|1|1|1st Batch/For stock 1/9:DWG Approved/BT|Y
01|214908|2|1|1st Batch   1/8 approved|Y
01|214908|3|1|1st Batch|Y
01|214908|4|1|Req.INS/T/P Inspection Required|Y
01|214908|5|1|Req.INS/T/P Inspection Required|Y
01|214908|6|1|T/P Inspection Required|Y
01|214908|7|1|Req.INS/T/P Inspection Required|Y
01|214908|8|1|Req.INS/T/P Inspection Required|Y
01|214908|9|1|1st Batch/for stock  10/23 approved|Y
01|214908|10|1|cReq.INS/T/P Inspection Required|Y
01|214908|11|1|Req.INS/T/P Inspection Required|Y
01|214908|12|1|Req.INS/T/P Inspection Required|Y
01|214908|13|1|Req.INS/T/P Inspection Required|Y
01|214908|14|1|Req.INS/T/P Inspection Required|Y
01|214908|15|1|1st Batch 12/8:DWG Approved/TR|Y
01|214953|1|1|Non-returnable non-cancellable|Y
01|214953|1|2|Quoted NET pricing|Y
01|214954|21|1|No CP coolant port|Y
01|214971|1|1|RFID Chip BIS011 LF (70/455 kHz installed in holders.|Y
01|214978|1|1|S/N:130059|Y
01|214990|6|1|We do have the HSK100A-1000-6.00 in stock and I will|Y
01|214990|6|2|give these to you at the same price if they order|Y
01|214990|6|3|them.|Y
01|214995|2|1|Installation includes: Drive unit short bar fiber|Y
01|214995|2|2|optic cable communcation cable bulkhead cables|Y
01|214995|2|3|external cables parameter changes service time and|Y
01|214995|2|4|travel.|Y
01|214995|3|1|Includes: Drive unit short bar fiber optic cable|Y
01|214995|3|2|communications cable bulkhead cables & external cables|Y
01|214999|1|1|Additional 20% Overstock Promo discount applied. Once|Y
01|214999|1|2|a PO is placed it cannot be cancelled or returned.|Y
01|214999|2|1|20% Overstock Promo Sale applied to NC5066-0750-15.00|Y
01|215003|4|1|**Overstock item non-cancellable and non-returnable|Y
01|215003|4|2|once a PO has been placed.|Y
01|215007|1|1|Service charge to Modify P/N: CAT50-SF1250-3.94CP to:|Y
01|215007|1|2|P/N: CAT50-SF1250-3.94CP-IDI (final part number)|Y
01|215007|1|3|This modification includes the chip hole install|Y
01|215007|1|4|balluff chip and balluff chip install and rebalance|Y
01|215007|1|5|Price is NET price QTY 1-4 pieces.|Y
01|215007|1|6|RGA# MOD-60739|Y
01|215007|1|7|Shipping Charges are the customer responsibility|Y
01|215013|1|1|Please note: This angle head is external coolant only.|Y
01|215013|4|1|Quoted at NET price.|Y
01|215013|4|2|We will need spindle dimensional information if|Y
01|215013|4|3|we receive purchase order. ATC or No? If yes you will|Y
01|215013|4|4|need to verify clearances and weight restrictions.|Y
01|215018|1|1|RGA#LVR-60701/|Y
01|215018|1|2|Repair of H63ARAM-ER25-1870 TC  s/n:45829 01|Y
01|215018|1|3|(Mimatic#179165)|Y
01|215018|2|1|Bearing seals and o-rings to be replaced|Y
01|215019|1|1|JKA 6A 32X25-S3-RK|Y
01|215019|2|1|JKA 6A 32X25-S4-RK|Y
01|215024|1|1|**Quoted at NET Price**|Y
01|215024|1|2|Please note this item cannot be cancelled or returned|Y
01|215024|1|3|after receipt of PO.|Y
01|215026|1|1|Special showroom demo table.|Y
01|215026|2|1|Special showroom demo unit.|Y
01|215027|1|1|Part# HW-10-2J3J-HS|Y
01|215027|1|2|Master Jaw Set for H023M10|Y
01|215033|3|1|PMK8-2|Y
01|215033|4|1|PMK8-2.2|Y
01|215033|7|1|PMK8-2.8|Y
01|215033|11|1|PMK8-3.4|Y
01|215033|13|1|PMK8-3.8|Y
01|215033|15|1|PMK8-4.2|Y
01|215033|16|1|PMK8-4.4|Y
01|215033|18|1|PMK8-4.8|Y
01|215033|20|1|PMK8-5.2|Y
01|215033|21|1|PMK8-5.4|Y
01|215033|23|1|PMK8-5.8|Y
01|215033|25|1|PMK8-6.2|Y
01|215033|28|1|PMK8-6.8|Y
01|215033|30|1|PMK8-7.2|Y
01|215033|31|1|PMK8-7.4|Y
01|215033|34|1|PMK8-2.8|Y
01|215037|2|1|SK20 Z ICE LT BMT55 ER32 1:1 6500rpm for TM-4000Y2|Y
01|215037|2|2|Special Order. Net Price Each. MOQ: 5|Y
01|215037|2|3|Delivery: 15Weeks (DESIGN 4WK + MFG 12WK + Ship 2WK)|Y
01|215042|1|1|Includes motor and cable set.|Y
01|215042|1|2|Motors need to be ordered.|Y
01|215055|1|1|Part#: HW-10-2J3J-HS  **Quoted at NET Price**|Y
01|215055|1|2|Master Jaw Set for H023M10 4 pieces per set|Y
01|215055|1|3|Please note: This is special non-standard stock. Once|Y
01|215055|1|4|a PO is placed it cannot be cancelled or returned.|Y
01|215067|2|1|Repair Option - New Pendant|Y
01|215067|5|1|This is a demo unit and comes with all normal items and|Y
01|215067|5|2|accessories.  6 month warranty on unit and components.|Y
01|215067|5|3|Replacement Option #1 (SN#5JB6015)|Y
01|215067|8|1|This is the updated model and our current new offerings|Y
01|215067|8|2|Replacement Option#2|Y
01|215068|1|1|FUJI LIVE; O110; 90 DEG HEAD; ER40; L1= 58mm;|Y
01|215068|1|2|COOLANT THRU SPINDLE AND OVER NOZZLES;|Y
01|215068|1|3|Options: Oil/Lubrication or Grease Sealed|Y
01|215068|1|4|2:1 GEAR MAX 130Nm; MAX 2500RPM; Mimatic Part #102771|Y
01|215079|1|1|BOAT#041152401-B: No INS Req'd.|Y
01|215079|2|1|BOAT#041152401-B: No INS Req'd.|Y
01|215079|3|1|BOAT#041152401-B: No INS Req'd.|Y
01|215079|4|1|BOAT#041152401-B: No INS Req'd.|Y
01|215079|5|1|BOAT#041152401-B: No INS Req'd.|Y
01|215091|5|1|INCUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|215094|1|1|Asking factory for expected price+lead time|Y
01|215094|3|1|Possible alternative|Y
01|215100|2|1|Normal Discount PLUS Additional 22% for Flash Sale|Y
01|215100|3|1|Normal Discount PLUS Additional 20% for Overstock Sale|Y
01|215100|4|1|NET Charge for Lyndex Nikken to thread draw nut.|Y
01|215100|4|2|Customer must supply dimensions per worksheet from LYN.|Y
01|215100|8|1|NET Charge for Lyndex Nikken to thread draw nut.|Y
01|215100|8|2|Customer must supply dimensions per worksheet from LYN.|Y
01|215103|3|1|NET Charge for Lyndex to thread draw nut - Customer to|Y
01|215103|3|2|provide dimensions.|Y
01|215103|8|1|NET Charge for Lyndex to thread draw nut - Customer to|Y
01|215103|8|2|provide dimensions.|Y
01|215111|1|1|HSK100A-SM0750-10.00CP|Y
01|215111|1|2|HSK100A 3/4 Shell Mill Holder w/10 projection|Y
01|215111|1|3|with coolant ports|Y
01|215113|2|1|Quoted at NET price.|Y
01|215114|2|1|Alternative more than 28 in stock. 1.18 shorter G/L|Y
01|215135|4|1|Installation package includes: Drive units cabinet|Y
01|215135|4|2|cables cabinet to pallet center cables external cable|Y
01|215135|4|3|set.|Y
01|215135|5|1|Service time and travel.|Y
01|215169|1|1|Oil change labor charge is included for this time only.|Y
01|215169|2|1|1 hour labor for motor cover change.|Y
01|215169|2|2|Motor Cover Parts#: KS-AX350R-FA177T|Y
01|215169|3|1|Lubricating Oil Super Multi Oil #100|Y
01|215169|3|2|Capacity: 3100ml (0.82gal) For 5AX-350FA|Y
01|215171|1|1|Lyndex-Nikken Part Number TBD: Mimatic #204435|Y
01|215171|1|2|Muratec live; O55; straight offset  [A=70mm]; MI40;|Y
01|215171|1|3|L1=95mm;1:2.667 GEAR RATIO; MAX 50Nm;MAX IN 3000 RPM|Y
01|215171|1|4|MAX OUT 8000 RPM;REF DRWG# 63249|Y
01|215171|12|1|MI40-HC17  MI40 Hydraulic Chuck 17mm|Y
01|215172|1|1|Please note: This is non-standard stock. Once a PO is|Y
01|215172|1|2|placed it cannot be cancelled or returned.|Y
01|215179|1|1|NC5-46-SK16-90SA w/PS-123-Air MACI Special 15K|Y
01|215179|1|2|Must ship with Pull Stud installed.|Y
01|215179|1|3|Quoted at NET price.|Y
01|215188|2|1|TU0604BU BREAKPACK QTY SOLD BY METER|Y
01|215188|3|1|TU0604R BREAKPACK QTY SOLD BY METER|Y
01|215191|1|1|SRS-3.175|Y
01|215191|2|1|SRS-3.97|Y
01|215191|3|1|SRS-4.763|Y
01|215191|4|1|SRS-6.35|Y
01|215191|5|1|SRS-7.938|Y
01|215198|1|1|Includes cables.|Y
01|215210|5|1|Includes: Mounting of the tableparmeter changes|Y
01|215210|5|2|service time and travel.|Y
01|215212|2|1|HSK63C Blank Bar 4.73 OD x 2.74 projection|Y
01|215212|2|2|(per customer drawing)|Y
01|215212|2|3|LT is 4-6w after receipt of approval drawing|Y
01|215212|2|4|Quoted to Chuck Vargo $489 ea.|Y
01|215220|2|1|Includes cables.|Y
01|215220|3|1|Machine must have additional axis software option|Y
01|215220|3|2|Machine must have polar detect|Y
01|215225|1|1|Machine ID chip pockets & rebalance to 15K rpm @ G2.5|Y
01|215225|1|2|11x non-Lyndex-Nikken hydraulic holders|Y
01|215240|1|1|No Inspection Required|Y
01|215249|1|1|Alps #NKA01-28000  Nakamura Live ER11 45-Deg 1:1 Ratio|Y
01|215249|1|2|External Coolant 6000 RPM|Y
01|215249|1|3|Quoted at NET price.|Y
01|215267|1|1|If order is placed by 5/6/24 ETA to Lyndex-Nikken|Y
01|215267|1|2|5/15~5/17.|Y
01|215268|1|1|Special Discount quoted.|Y
01|215278|2|1|***In Stock Alternative to H63A-SF0250-3.15CP|Y
01|215279|1|1|Discount of 42% applies to 10-29 pcs|Y
01|215279|2|1|Discount of 46% applies to 30-50 pcs|Y
01|215284|2|1|***In Stock Alternative to H63A-SF0250-3.15CP|Y
01|215296|1|1|Includes: CNCZ105 rotary table Nikken AA21 control|Y
01|215296|1|2|pendant for programming M-code cable and power cable.|Y
01|215296|2|1|Includes: CNCZ105 rotary table Nikken AA21 control|Y
01|215296|2|2|pendant for programming M-code cable and power cable.|Y
01|215299|1|1|P/N: HSK100T-C6-100|Y
01|215299|1|2|HSK100T Taper to Capto6 adaption GL 100mm|Y
01|215299|2|1|P/N: HSK100T-C6-100|Y
01|215299|2|2|HSK100T Taper to Capto6 adaption GL 100mm|Y
01|215302|1|1|Service call for Sethy Six s/n:5487|Y
01|215302|1|2|This is a time based estimate.|Y
01|215302|1|3|Any parts that would be required would be additional.|Y
01|215303|3|1|THIS PRICE INCLUDES FULL INSTALL WITH AMP; IF AMP IS|Y
01|215303|3|2|ALREADY PRESENT WE CAN DEDUCT $4000 FROM THIS PRICE|Y
01|215303|3|3|WE WILL NEED TO HAVE A PICTURE OF THE ELECTRICAL|Y
01|215303|3|4|CABINET TO MAKE SURE WE MATCH THE MOTOR PROPERLY|Y
01|215303|3|5|IF THE AMP IS ALREADY PRESENT.|Y
01|215304|3|1|Includes: Drive unit short bar fiber optic cable|Y
01|215304|3|2|communications cable bulkhead cables external cables|Y
01|215304|3|3|parameter changes service time and travel.|Y
01|215306|7|1|NET PRICE|Y
01|215309|7|1|Spindle Stop Block|Y
01|215316|1|1|This tool draws in from the side.|Y
01|215316|2|1|This tool draws in from the top after you remove the|Y
01|215316|2|2|pull stud.|Y
01|215332|14|1|PMK4-3.4|Y
01|215332|15|1|PMK4-3.6|Y
01|215332|16|1|PMK4-3.8|Y
01|215332|17|1|PMK4-4|Y
01|215337|1|1|This item is on our Overstock list and I can offer|Y
01|215337|1|2|an extra 20% which I included in the discount.|Y
01|215337|1|3|This holder does not come with coolant ports.|Y
01|215337|1|4|I only have 1 in stock and then this is discontinued.|Y
01|215340|1|1|Overstock extra 20% added to the discount and this|Y
01|215340|1|2|item is non returnable.|Y
01|215346|1|1|Net price|Y
01|215358|1|1|CNCZ180LSA-BR2 SN: 25363T|Y
01|215366|1|1|9 confirmed stock at Factory ETA Mid May if order by|Y
01|215366|1|2|5/2. Balance 1 pc. Mid August.|Y
01|215366|1|3|Order placed after 5/2. ETA Mid June.|Y
01|215367|1|1|P/N: JKA 6A 32X25-S3-RK|Y
01|215367|1|2|Clamp Cylinders|Y
01|215367|2|1|P/N: JKA 6A 32X25-S4-RK|Y
01|215367|2|2|Clamp Cylinders|Y
01|215382|1|1|One pc left after HP-6WP will be the replacement|Y
01|215385|1|1|17 stock 1 month 18pc 3 month remainder of 15|Y
01|215385|1|2|25 pcs - 44% discount|Y
01|215385|1|3|50 pcs - 48% discount|Y
01|215393|1|1|STANDARD EXTERNAL COOLANT LIVE TOOL|Y
01|215393|2|1|INTERNAL OR EXTERNAL COOLANT CAPABLE|Y
01|215408|1|1|17 stock 1 month 18pc 3 month remainder|Y
01|215408|1|2|25 pcs - 45% discount|Y
01|215408|1|3|50 pcs - 50% discount|Y
01|215412|1|1|Part# TBD   **QUOTED AT NET PRICE**|Y
01|215412|1|2|CAT40 2.5 OD x 5 Projection PER PRINT for CBN wheels|Y
01|215412|1|3|Please note: This is special non-standard stock. Once|Y
01|215412|1|4|a PO has been placed these items cannot be cancelled|Y
01|215412|1|5|or returned.|Y
01|215412|1|6|DELIVERY: Please allow 1-2 weeks for design time from|Y
01|215412|1|7|receipt of PO. Once approval drawing is signed expect|Y
01|215412|1|8|~10 Weeks for manufacturing & shipping.|Y
01|215415|2|1|We thread the draw screw in house.|Y
01|215430|1|1|THIS IS A SPECIAL TABLE -> NET PRICING ONLY|Y
01|215430|1|2|REPLACEMENT FOR SN 8158|Y
01|215430|1|3|ITEM CAN SHIP WITHIN 3-5 BUSINESS DAYS OF RECIEPT|Y
01|215430|1|4|L/N NOT RESPONSIBLE FOR INSTALLATION OF ROTARY TABLE|Y
01|215434|1|1|Special NET price for NIKKEN UK.|N
01|215434|2|1|Special NET price for NIKKEN UK.|Y
01|215434|2|2|Possible ALT(w/KM1-**) for HSK63A-C25-90G.|N
01|215443|1|1|RGA#LVR-60728/|Y
01|215443|1|2|Repair of 173012 s/n: 23821 07 (Mimatic#173012)|Y
01|215443|2|1|Bearings seals o-rings and bushing to be replaced.|Y
01|215443|4|1|RGA#LVR-60728/|Y
01|215443|4|2|Repair of 173012 s/n: 79546 01 (Mimatic#173012)|Y
01|215443|5|1|Bearings seals and o-rings to be replaced.|Y
01|215453|1|1|RGA#LVR-60748/|Y
01|215453|1|2|Repair of MZQT47-MI50X-OFF-ICE s/n:22903626 03|Y
01|215453|1|3|(Mimatic#123688)|Y
01|215453|2|1|Bearings seals o-rings and MI50 spindle to be|Y
01|215453|2|2|replaced.|Y
01|215467|1|1|Quoted at NET price.|Y
01|215470|5|1|Gage length not available in 1.75|Y
01|215470|6|1|Gage length not available in 1.75|Y
01|215470|7|1|Gage length not available in 1.75|Y
01|215472|3|1|**NET Price**|Y
01|215472|3|2|LN to thread blank draw nut to match customer's machine|Y
01|215472|3|3|drawtube. Delivery is 3-5 days upon receipt specs from|Y
01|215472|3|4|customer.|Y
01|215472|5|1|Additional 20% Discount Overstock Applied. Once a PO|Y
01|215472|5|2|is placed this item cannot be cancelled or returned.|Y
01|215472|6|1|20% Overstock Promotion applied only to QCFC80-048-EMR|Y
01|215477|2|1|HSK25E-SK6-45P-J|Y
01|215477|2|2|HSK25E Slim Chuck SK6 HiSpeed with J-Nut|Y
01|215477|2|3|IMTS Special Discount (Std Disc 28%)|Y
01|215477|8|1|HSK25E-SK10-55P-J|Y
01|215477|8|2|HSK25E Slim Chuck SK10 HiSpeed with J-Nut|Y
01|215477|8|3|IMTS Special Discount (Std Disc 28%)|Y
01|215477|14|1|HSK25EN-MMC4-60-AT|Y
01|215477|14|2|HSK25E MMC Mini Chuck 4mm DrawBar Coolant|Y
01|215477|14|3|IMTS Special Discount (Std Disc 28%)|Y
01|215487|1|1|1 set of cables for Doosan VC400|Y
01|215488|1|1|Set of cables for Doosan VC3600|Y
01|215504|1|1|Cables and air hose included|Y
01|215505|1|1|Includes 1 free set of wrenches per order|Y
01|215507|2|1|Additional 20% added to part# 340-020 Overstock Promo|Y
01|215513|1|1|C5001-0750-1.75CP-DIN-M|Y
01|215513|1|2|4 Hole-Burn|Y
01|215522|1|1|HSK63A 25mm HC 150mm GL|Y
01|215524|1|1|FOR: CNC302PFA-M  SN: 1086C|Y
01|215524|1|2|List = $11778.00 Suggested EU disc $-778.00|Y
01|215524|1|3|Special love for Casey Smith to help EU relations|N
01|215528|1|1|HSK63A 1/2 Shell mill 4 GL|Y
01|215541|1|1|UNV_5149 .375 dia Shrink fit 5.00 GL|Y
01|215541|1|2|Lyndex Part # CAT50-SF0375-5.00-IDKS|Y
01|215541|3|1|UNV_5149 .375 dia Shrink fit 5.00 GL|Y
01|215541|3|2|Lyndex Part # CAT50-SF0375-5.00-IDKS|Y
01|215541|5|1|UNV_5149 .375 dia Shrink fit 5.00 GL|Y
01|215541|5|2|Lyndex Part # CAT50-SF0375-5.00-IDKS|Y
01|215551|1|1|P/N: BMT45-C3X-ICE|Y
01|215558|1|1|Set of Cables for Doosan VC3600|Y
01|215558|1|2|8m and 1m cables.|Y
01|215561|1|1|P/N: TBD|Y
01|215561|1|2|CAT50 AGH; ER25 RECOMMENDED 3PIN SUPPORT|Y
01|215561|1|3|L=410mm; L1=300mm; 1:1 GEAR; MAX 30Nm; 8000RPM|Y
01|215561|1|4|WRENCHES not included|Y
01|215567|1|1|STH32-SK16-120-G|Y
01|215567|1|2|32mm Straight Shank Extension Slim Chuck SK16|Y
01|215567|1|3|with High Speed Nut. SKN-16B(GH)|Y
01|215567|3|1|Special Order Item. Non Cancellable.|Y
01|215567|3|2|MOQ 50|Y
01|215570|2|1|Once modification is complete the part number will|Y
01|215570|2|2|change to P/N: CAT50-SF1000-3.94CP-IDI|Y
01|215570|2|3|This modification includes the chip hole install|Y
01|215570|2|4|balluff chip and balluff chip install and rebalance.|Y
01|215570|2|5|LN supplied Balluff Chip P/N: BIS-C122-04/L|Y
01|215570|2|6|NET price will be $622.80 on item#2.|Y
01|215571|1|1|To be installed with PS-N46E at factory.|Y
01|215571|2|1|To be installed with S-NC5-46-FMA25.4CS-55 at factory.|Y
01|215580|1|1|Additional 20% Overstock Promo Discount applied. Once|Y
01|215580|1|2|a PO is placed it cannot be cancelled or returned.|Y
01|215580|2|1|20% Overstock Promotion applied only to NC5066-0625-15.|Y
01|215580|2|2|00|Y
01|215593|2|1|New table + Motor cover from old CNC260FA SN:9800|Y
01|215593|6|1|CNC260FA SN:9800|Y
01|215601|1|1|This item does NOT qualify for a Tooling Certificate|Y
01|215601|1|2|and would be at the offered pricing here.|Y
01|215601|2|1|This item can be purchased via a tooling certificate|Y
01|215601|2|2|at List Price Less 40%|Y
01|215601|3|1|This item can be purchased via a tooling certificate|Y
01|215601|3|2|at List Price Less 40%|Y
01|215601|4|1|This item can be purchased via a tooling certificate|Y
01|215601|4|2|at List Price Less 40%|Y
01|215611|1|1|Please Note: Pratt & Whitney part # PT918676REV- to be|Y
01|215611|1|2|Laser marked on the tooling.|Y
01|215614|1|1|Additional 20% Overstock Promo applied. Once a PO is|Y
01|215614|1|2|placed this item cannot be cancelled or returned.|Y
01|215614|2|1|Additional 20% Overstock Promo applied. Once a PO is|Y
01|215614|2|2|placed this item cannot be cancelled or returned.|Y
01|215614|3|1|20% Overstock Promotion applied only to above 2 items.|Y
01|215623|1|1|Please note: This is special non-standard stock. Once|Y
01|215623|1|2|a PO is placed it cannot be cancelled or returned.|Y
01|215651|1|1|T/P Inspection Required|Y
01|215651|2|1|T/P Inspection Required|Y
01|215651|3|1|T/P Inspection Required|Y
01|215651|4|1|T/P Inspection Required|Y
01|215652|1|1|Comes standard with SKN-16B already installed|Y
01|215652|2|1|Replacement nut for damaged one|Y
01|215668|1|1|C40RAM-ER32-180TS-65FP|Y
01|215668|1|2|CAT40 AngleHead ER32 Twin Spindle 65mm Pitch Flat Pin|Y
01|215668|1|3|Mimatic # 135720|Y
01|215668|1|4|Please Note: This tool is Special once a purchase|Y
01|215668|1|5|order is placed it cannot be cancelled or returned.|Y
01|215668|2|1|If customer decides to go with this angle head they|Y
01|215668|2|2|will need a new positioning block. TBD|Y
01|215681|6|1|BT50-SK6-135|Y
01|215681|14|1|BT50-RAC53-240|Y
01|215681|15|1|BT50-RAC53-210|Y
01|215681|16|1|BT50-RAC43-240|Y
01|215681|17|1|BT50-RAC100-290|Y
01|215681|18|1|BT50-ZMAC42-240V|Y
01|215681|19|1|BT50-ZMAC55-210|Y
01|215681|21|1|BT50-SK20-165|Y
01|215681|24|1|BT50-Z8-105|Y
01|215681|36|1|BT50-MTA1-180|Y
01|215681|38|1|BT50-MTA1-180|Y
01|215681|39|1|BT50-SK16-195 disc.|Y
01|215681|40|1|BT50-SK6-195 disc.|Y
01|215681|41|1|BT50-SK10-195 disc.|Y
01|215681|42|1|BT50-SK16-195 disc.|Y
01|215681|43|1|BT50-SK6-195 disc.|Y
01|215681|49|1|BT50-RAC130-285|Y
01|215681|50|1|BT50-RAC70-285|Y
01|215681|51|1|BT50-RAC70-285|Y
01|215681|52|1|BT50-RAC100-290|Y
01|215681|53|1|BT50-RAC130-285|Y
01|215681|54|1|BT50-RAC130-285|Y
01|215681|55|1|BT50-ZMAC70-300V|Y
01|215681|56|1|BT50-ZMAC70-300V|Y
01|215681|57|1|BT50-ZMAC100-225V|Y
01|215681|58|1|BT50-ZMAC100-290V|Y
01|215681|59|1|BT50-ZMAC100-225V|Y
01|215681|60|1|BT50-ZMAC140-315V disc.altBT50-ZMAC140-325V|Y
01|215681|61|1|BT50-ZMAC140-225V|Y
01|215681|70|1|BT50-RAC-100-290|Y
01|215681|72|1|BT50-RAC-70-285|Y
01|215681|73|1|BT50-RAC-70-285|Y
01|215681|74|1|BT50-RAC-100-290|Y
01|215681|75|1|BT50-RAC130-235|Y
01|215681|76|1|BT50-ZMAC100-290|Y
01|215681|77|1|BT50-ZMAC100-290|Y
01|215681|78|1|BT50-ZMAC70-300V|Y
01|215681|79|1|BT50-ZMAC70-300V|Y
01|215681|80|1|BT50-ZMAC100-290|Y
01|215681|81|1|BT50-BAC130-235|Y
01|215681|82|1|BT50-SK6-195 disc. --> alt. BT50-SK6-200|Y
01|215681|83|1|BT50-SK10-195 desc. --->alt. BT50-SK10-200|Y
01|215681|84|1|BT50-SK10-195 disc. --> alt. BT50-SK10-200|Y
01|215683|1|1|Face Plate - $900.00 Net Price 4 to 6 week ARO|Y
01|215683|3|1|Face Plate $1000.00 Net Price 4 to 6 weeks ARO|Y
01|215683|6|1|4th and 5th axis Cables from the Nikken Table to|Y
01|215683|6|2|Machine Bulkhead|Y
01|215683|8|1|4th&5th axis Complete installation interface amps|Y
01|215683|8|2|Includes Power and Feedback Cables from Nikken table to|Y
01|215683|8|3|Machine Bulkhead|Y
01|215690|1|1|RPLC for BOAT#605/00/2024 Undershipment|Y
01|215690|1|2|9/4RY:ARVD w/I#923/00/2024(BOAT)|Y
01|215699|3|1|Requires Qty 2|Y
01|215710|6|1|P/N: MZQT47-BG10Z-MD-C|Y
01|215710|6|2|Mazak VDI40 Static BG1 Z<Axial>90D Main Dual|Y
01|215710|6|3|IntExtCool|Y
01|215710|8|1|P/N: MZQT47-ER25X-OFF-ICE|Y
01|215710|8|2|Mazak VDI40 Live ER25 X<Radial>STRT Offset|Y
01|215710|8|3|IntExtCool|Y
01|215716|1|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|215716|2|1|Req.INS/Install A3/8-24 & 3/4-KEYSET|Y
01|215716|3|1|1st Batch/973734 TJ Aerospace 3/8:DWG APROVD/Customer|Y
01|215716|4|1|1st Batch/973734 TJ Aerospace 3/8:DWG APROVD/Customer|Y
01|215716|5|1|1st Batch/973734 TJ Aerospace 3/8:DWG APROVD/Customer|Y
01|215716|6|1|1st Batch/973734 TJ Aerospace 3/8:DWG APROVD/Customer|Y
01|215716|7|1|1st Batch/973734 TJ Aerospace 3/8:DWG APROVD/Customer|Y
01|215716|8|1|1st Batch/973734 TJ Aerospace 3/8:DWG APROVD/Customer|Y
01|215716|9|1|1st Batch/975162 Hurst/Spirit 3/20:waiting for Approval|Y
01|215716|10|1|1st Batch/975162 Hurst/Spirit 3/20:waiting for Approval|Y
01|215716|10|2|Also make sure B/U screw is installed.|Y
01|215716|11|1|Req.INS/Make sure B/U screw is installed.|Y
01|215731|1|1|Part# MZQT46-ER32Z-MS|Y
01|215731|1|2|**Quoted at NET Price**|Y
01|215731|1|3|Mazak VDI40 Live ER32 Z<Axial>90D MainSub 1+1 ExtCool|Y
01|215731|1|4|.|Y
01|215731|1|5|Please Note: This is special non-standard stock. Once|Y
01|215731|1|6|a PO is placed it cannot be cancelled or returned.|Y
01|215735|1|1|Modifiy 162731 into 162732|Y
01|215735|1|2|Bearings seals o-rings asnd existing CAT40 spindle|Y
01|215735|1|3|with CAT50 spindle|Y
01|215751|1|1|The collet above is part of our Overstock promotion.|Y
01|215751|1|2|All sales are final.|Y
01|215753|1|1|MOQ of 24pcs|Y
01|215758|4|1|Net pricing|Y
01|215759|5|1|Net pricing|Y
01|215763|4|1|Option 1 = Bearing Nut (Better Gripping Force)|Y
01|215763|5|1|Option 2 = Standard Solid Nut Style|Y
01|215763|6|1|Option 1 = Bearing Nut (Better Gripping Force)|Y
01|215763|7|1|Option 2 = Standard Solid Nut Style|Y
01|215768|1|1|Part# TBD  **NET Pricing**|Y
01|215768|1|2|CAT50 Stub Mill Holder d=2.0 D=2.75 L1=8 L=10|Y
01|215768|1|3|Drive Key=.5 wide|Y
01|215768|1|4|QTY BREAK NET PRICING (MOQ 2 pieces)|Y
01|215768|1|5|2-9 pcs: $866 ea/net|Y
01|215768|1|6|10+ pcs: $578 ea/net|Y
01|215768|2|1|Part# TBD  **NET Pricing**|Y
01|215768|2|2|CAT50 Stub Mill Holder d=2.0 D=2.75 L1=12 L=14|Y
01|215768|2|3|drive key=.5 wide|Y
01|215768|2|4|QTY BREAK NET PRICING (MOQ 2 pieces):|Y
01|215768|2|5|2-9 pcs: $1174 ea/net|Y
01|215768|2|6|10+ pcs: $782 ea/net|Y
01|215768|3|1|Part# TBD  **NET Pricing**|Y
01|215768|3|2|CAT50 Stub Mill Holder d=2.0 D=2.75 L1=16 L=18|Y
01|215768|3|3|drive key=.5 wide|Y
01|215768|3|4|QTY BREAK NET PRICING (MOQ 2 pieces):|Y
01|215768|3|5|2-9 pcs: $1282 ea/net|Y
01|215768|3|6|10+ pcs: $856 ea/net|Y
01|215772|2|1|A tariff surcharge may be added to this quotation in|Y
01|215772|2|2|the event of a sustained tariff increase on the|Y
01|215772|2|3|importation of this product.  Any surcharge will be|Y
01|215772|2|4|disclosed prior to acceptance of an order.|Y
01|215785|1|1|Replaces C40-TESTBAR-14.0 - see drawing|Y
01|215785|2|1|Replaces C50-TESTBAR-10.0 - see drawing|Y
01|215788|5|1|TW30|Y
01|215788|5|2|Tool Wagon BT30 (ToolHolder storage# 60)|Y
01|215788|6|1|TW40|Y
01|215788|6|2|Tool Wagon BT40 (ToolHolder Storage# 48)|Y
01|215793|3|1|BT50-SL40CN-105|Y
01|215793|4|1|ST40-COMZ80-150|Y
01|215803|6|1|Please pack Blue Paper Towels and WD-40 with these.|Y
01|215812|2|1|Net pricing|Y
01|215814|1|1|5AX-500FA-APC SN: 2001|Y
01|215815|6|1|Includes: Drive unit short bar fiber optic cables|Y
01|215815|6|2|communications cables and external cables.|Y
01|215819|1|1|replaces part# HP-6|Y
01|215825|1|1|CAT50 ER32 RIGHT ANGLE HEAD|Y
01|215825|1|2|51.629 FT LBS MAX TORQUE - 6500 MAX RPM|Y
01|215825|1|3|NO COOLANT THRU CAPABILITY|Y
01|215825|2|1|CAT50 OFFSET ER32 RIGHT ANGLE HEAD|Y
01|215825|2|2|51.629 FT LBS MAX TORQUE - 6000 RPM MAX|Y
01|215825|2|3|COOLANT THRU CAPABLE ***NOTE: COOLANT MUST BE RUN;|Y
01|215825|2|4|CANNOT RUN DRY***|Y
01|215825|3|1|CAT50 ER40 RIGHT ANGLE HEAD|Y
01|215825|3|2|110.634 FT LBS MAX TORQUE - 5000 RPM MAX|Y
01|215825|3|3|NO COOLANT THRU CAPABILITY|Y
01|215830|3|1|The wrench above is part of our Overstock Promotion.|Y
01|215830|3|2|All sales are final.|Y
01|215834|2|1|Please Note: This is quoted at NET price.|Y
01|215841|1|1|Modular AngleHead Taper HSK63F w/o Positioning Arm|Y
01|215841|1|2|Quantity Break: 2pcs NET:2868.83/EA|Y
01|215841|1|3|Quantity Break: 3pcs NET:2256.41/EA|Y
01|215841|1|4|Delivery: Please allow 4 weeks for design time from|Y
01|215841|1|5|receipt of PO. Once approval drawing signed expect|Y
01|215841|1|6|7-8 weeks for manufacturing and shipping.|Y
01|215841|1|8|These are custom angle heads for specific applications.|Y
01|215841|1|9|Once a PO has been placed these units cannot be|Y
01|215841|1|10|cancelled or returned.|Y
01|215854|1|1|5AX-130ZA SN: 3148|Y
01|215862|2|1|3-874-166P|Y
01|215862|2|2|Back plate for SET-TRU 16in A2-6|Y
01|215876|1|1|SPECIAL FLASH SALE DISCOUNT - ENDS 5/31/24|Y
01|215876|10|1|A tariff surcharge of 8% will be added to every order|Y
01|215876|10|2|placed after September 1st 2025(until further notice).|Y
01|215876|10|3|This surcharge will be acknowledged upon acceptance|Y
01|215876|10|4|of every order.|Y
01|215912|2|1|ADDITIONAL 20% OFF OVERSTOCK DISCOUNT|Y
01|215912|2|2|CANNOT BE CANCELLED OR RETURNED ONCE ORDERED|Y
01|215915|1|1|Delivery: 2 stock Balance ~1 Week ARO after 5/30|Y
01|215918|1|1|Please Note: This is special non-standard stock. Once|Y
01|215918|1|2|a PO is placed this item cannot be cancelled or|Y
01|215918|1|3|returned.|Y
01|215921|2|1|***Alternative in Stock***|Y
01|215921|11|1|***Wrench for alternate BearingNut Holder***|Y
01|215930|3|1|Installation includes service tech coming to location|Y
01|215930|3|2|and hooking up external cables and entering parameters|Y
01|215930|3|3|Amplifier/4th Axis interface to be provided by Nidec|Y
01|215930|3|4|and/or Yamazen.  Ladder modifications/additions needed|Y
01|215930|3|5|by the machine MFG.|Y
01|215930|3|6|Machine:  Nidec MV12BxII|Y
01|215936|1|1|P/N: HSK100A-SM2000-6.00CP|Y
01|215936|1|2|HSK100A taper 2 shell mill holder 6.00 gauge length|Y
01|215936|1|3|with coolant ports.|Y
01|215939|3|1|Special Item can't be cancelled or returned once the|Y
01|215939|3|2|order is placed|Y
01|215941|3|1|Additional 20% OVERSTOCK promo discount added|Y
01|215941|3|2|Final Sale|Y
01|215952|1|1|HSK125A 13MM KEYLESS DRILL CHUCK - SEE MIMATIC|Y
01|215952|1|2|DRAWING ATTACHED.|Y
01|215978|1|1|5 Stock|Y
01|215978|1|2|1 - ETA 1 month|Y
01|215978|1|3|Balance - ETA 10-14 Weeks|Y
01|215978|2|1|Alternate option with immediate delivery for 8pcs|Y
01|215978|3|1|5 - ETA 4-6 Weeks|Y
01|215978|3|2|Balance - ETA 10-14 Weeks|Y
01|215978|4|1|Awaiting restocking shipment due to arrive 5/17/24.|Y
01|215978|4|2|Providing on time arrival 8pcs could deliver 5/20-22.|Y
01|215979|1|1|#PT459792|Y
01|215979|2|1|#PT459795|Y
01|215979|3|1|#PT459796|Y
01|215983|1|1|Dimension: 25x32x5|Y
01|215983|2|1|Dimension: 35x45x5|Y
01|215983|3|1|Dimension: 40x50x5|Y
01|215983|4|1|Dimension: 55x63x6|Y
01|215990|1|1|1st Batch 12/8:DWG Approved/TR|Y
01|215990|2|1|(4)968482 1st Batch/  1/3 approved|Y
01|215990|3|1|Req.INS/T/P Inspection Required|Y
01|215991|1|1|1st Batch 1/29:DWG Approved/BT|N
01|215991|2|1|1st Batch/For Stock 12/11:DWG Approved/TR.|N
01|215991|3|1|Req.INS/T/P Inspection Required|N
01|215991|4|1|T/P Inspection Required|N
01|215991|5|1|Req.INS/T/P Inspection Required|N
01|215991|6|1|Req.INS/T/P Inspection Required|N
01|215991|7|1|MFG7/30UPD4/1 Req.INS/T/P Inspection Required|N
01|215991|8|1|Req.INS/T/P Inspection Required|N
01|215991|9|1|Req.INS/T/P Inspection Required|N
01|215991|10|1|Req.INS/T/P Inspection Required|N
01|215991|11|1|T/P Inspection Required|N
01|215991|12|1|1st Batch 1/29:DWG Approved/BT|N
01|215991|13|1|T/P Inspection Required|Y
01|215994|17|1|If you have a TQW-150 or TQW-200 either of these will|Y
01|215994|17|2|work.|Y
01|216022|1|1|Req.INS/Install S3/4-16X11/16|Y
01|216022|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|216022|3|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|216022|4|1|Req.INS/Install A3/8-24 & 3/4-KEYSET|Y
01|216022|5|1|1st Batch/Install SKN-10K 976263 S.CA.Prec. Machining|Y
01|216022|6|1|Req.INS/Install S9/16-18X1/2|Y
01|216034|1|1|P/N: BMT75-C5X-ICE|Y
01|216034|1|2|BMT75 live PSC C5 X<Radial>STRT IntExtCool 7MP 6K|Y
01|216034|2|1|P/N: BMT75-C5Z-ICE-110|Y
01|216034|2|2|BMT75 Live PSC C5 Z<Axial>90D IntExtCool 7MP 6K 110CH|Y
01|216060|1|1|5AX-201MA-M-AB SN: 7594|Y
01|216060|1|2|RGA#TAR-60783|Y
01|216069|1|1|This is the same cylinder that is currently on their|Y
01|216069|1|2|machines set up with the 5C fixtures.|Y
01|216070|3|1|Lyndex Nikken to make a customer positioning block that|Y
01|216070|3|2|will work for the 3 existing angle heads as well as the|Y
01|216070|3|3|NX5 Speeder quoted above.  Customer to confirm the|Y
01|216070|3|4|clearance needed for angle head positioning pin to|Y
01|216070|3|5|clear the top of the block add on and Lyndex will make|Y
01|216070|3|6|the block accordingly to maintain clearance and|Y
01|216070|3|7|functionality.|Y
01|216071|1|1|5 Stock|Y
01|216071|1|2|1 - ETA 1 month|Y
01|216071|1|3|Balance - ETA 10-14 Weeks|Y
01|216071|2|1|Alternate option with immediate delivery for 8pcs|Y
01|216071|3|1|5 - ETA 4-6 Weeks|Y
01|216071|3|2|Balance - ETA 10-14 Weeks|Y
01|216071|4|1|Awaiting restocking shipment due to arrive 5/17/24.|Y
01|216071|4|2|Providing on time arrival 8pcs could deliver 5/20-22.|Y
01|216079|1|1|NEW POSITIONING BLOCK DESIGN FOR 10-HOLE CAT40 HAAS|Y
01|216079|1|2|SPINDLE DESIGN|Y
01|216096|4|1|Optional Sealed Coolant Collet|Y
01|216096|6|1|Optional Sealed Coolant Collet|Y
01|216096|8|1|Optional Sealed Coolant Collet|Y
01|216096|13|1|Optional Sealed Coolant Collet|Y
01|216096|15|1|Optional Sealed Coolant Collet|Y
01|216109|1|1|P/N: C4001-0500-12.00CP|Y
01|216109|1|2|CAT40 1/2 pilot shell mill holder 12.00 gauge length|Y
01|216109|2|1|P/N: HSK63A-SM0500-12.00CP|Y
01|216109|3|1|P/N: C4001-0750-11.77CP|Y
01|216109|3|2|CAT40 taper 3/4 Shell Mill holder with 11.77|Y
01|216109|3|3|gauge length coolant ports|Y
01|216109|4|1|P/N: HSK63A-SM0750-11.77CP|Y
01|216109|4|2|HSK63A Taper 3/4 Shell Mill holder with 11.77|Y
01|216109|4|3|gauge length coolant ports|Y
01|216109|5|1|P/N: C4001-0750-13.77CP|Y
01|216109|5|2|CAT40 Taper 3/4 Shell Mill holder with 13.77|Y
01|216109|5|3|gauge length coolant ports|Y
01|216109|10|1|P/N: HSK63A-SM0750-13.77CP|Y
01|216109|10|2|HSK63A Taper 3/4 Shell Mill holder with 13.77|Y
01|216109|10|3|gauge length coolant ports|Y
01|216111|1|1|5AX-130ZA SN:2017|Y
01|216111|1|2|RGA#TAR-60760|Y
01|216128|3|1|Special discount applied for first order only.|Y
01|216128|3|2|Valid until the end of Aug 2024.|Y
01|216134|1|1|Includes cable set|Y
01|216137|3|1|TEST|Y
01|216147|1|1|CNC201MA SN: 1400|Y
01|216147|1|2|TAR-60775|Y
01|216147|1|3|CHECKED MECHANICS OF THE ROTARY TABLE - OK|Y
01|216147|1|4|MECHANICAL BACKLASH AROUND 0.020|Y
01|216147|1|5|BRAKE TESTED -> WORKS OK|Y
01|216147|1|6|MOTOR CONNECTIONS SEEM DAMAGED - POSSIBLE MOTOR OR|Y
01|216147|1|7|WIRE HARNESS ISSUE.|Y
01|216147|3|1|REPAIR OF HA33NC-TS MOTOR|Y
01|216147|3|2|REPLACE BEARINGS ON AC MOTOR SIDE|Y
01|216147|3|3|ENCODER CONNECTOR WAS BAD REPLACING WITH NEW ENCODER|Y
01|216147|4|1|REPAIR/REPLACE WIRE HARNESS|Y
01|216153|1|1|5AX-201YA SN: 41889|Y
01|216153|1|2|RGA#TAR-60751|Y
01|216167|1|1|HYDRAULIC BRAKE SETUP|Y
01|216167|4|1|AIR BRAKE SETUP|Y
01|216168|1|1|Please note: This is special non-standard stock.|Y
01|216168|1|2|Once a PO is placed this item cannot be cancelled or|Y
01|216168|1|3|returned.|Y
01|216171|1|1|Delivery is 12 weeks after approval drawing is signed|Y
01|216171|3|1|Delivery is 12 weeks after approval drawing is signed|Y
01|216188|5|1|Net pricing|Y
01|216189|4|1|Net pricing|Y
01|216199|3|1|INSTALLATION FOR CNC401 W/ ALPHA21 CONTROLLER AND|Y
01|216199|3|2|HYDRAULIC UNIT. MACHINE MUST HAVE AT LEAST 1 M-CODE|Y
01|216199|3|3|AVAILABLE. IF USING RS-232 CUSTOMER MUST ALSO HAVE|Y
01|216199|3|4|MACRO FUNCTION AVAILABLE AS WELL.|Y
01|216208|2|1|**Net Price**|Y
01|216208|2|2|Delivery = 3-5 days after design is complete|Y
01|216213|1|1|No Inspection Required.|Y
01|216213|2|1|No Inspection Required.|Y
01|216222|5|1|P/N: TBD|Y
01|216222|5|2|CAT50 AGH;ER25;OFFSET;Additional Bearing;|Y
01|216222|5|3|L=215mm 1:1 Gear Max 15Nm; 10K RPM;|Y
01|216222|5|4|NO COOLANT;|Y
01|216222|5|5|Ref: 00050158|Y
01|216227|1|1|Additional OVERSTOCK discount of 20% has been added.|Y
01|216227|1|2|This is Final Sale.|Y
01|216237|2|1|Replacing part# 1TH-01964-SET|Y
01|216243|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|216243|3|1|INCLUDES TRAVEL LODGING LABOR & PARAMETER ENTRY|Y
01|216243|3|2|FOR INSTALLATION OF 5AX-100 ON HAAS MINI MILL|Y
01|216246|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|216246|3|1|INCLUDES TRAVEL LODGING LABOR & PARAMETER ENTRY|Y
01|216246|3|2|FOR INSTALLATION OF 5AX-100 ON HAAS MINI MILL|Y
01|216249|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|216249|3|1|INCLUDES TRAVEL LODGING LABOR & PARAMETER ENTRY|Y
01|216249|3|2|FOR INSTALLATION OF 5AX-100 ON HAAS MINI MILL|Y
01|216252|1|1|1st Batch|Y
01|216252|2|1|1st Batch/967677/MSC/Walker Forge 1/24:DWG APRV'D/Walke|Y
01|216259|9|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|216259|9|2|2.0 METER FOR FANUC ROBODRILL MEDIUM BED MACHINE|Y
01|216259|10|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|216259|10|2|2.0 METER FOR FANUC ROBODRILL MEDIUM BED MACHINE|Y
01|216263|1|1|RGA#CUR-60709/|Y
01|216263|1|2|Repair of MRAM-MI40L s/n:65609 02 (Mimatic#178048)|Y
01|216263|2|1|Bearings seals and o-rings to be replaced.|Y
01|216263|4|1|RGA#CUR-60709/|Y
01|216263|4|2|Repair of PA80-CAT s/n:19905593 05 (Mimatic#162743)|Y
01|216263|5|1|Oil seals spring and locking plate to be replaced.|Y
01|216263|7|1|RGA#CUR-60709/|Y
01|216263|7|2|Repair of PA80-CAT s/n:Unknown (Mimatic#162743)|Y
01|216263|8|1|Oil seals spring and locking plate to be replaced.|Y
01|216264|8|1|(Net Price to Yamazen.)|Y
01|216266|5|1|Installation includes: Cable mounting and paremeter|Y
01|216266|5|2|changes.|Y
01|216277|8|1|(Net Price to Yamazen.)|Y
01|216283|1|1|RGA#CUR-60715/|Y
01|216283|1|2|Repair of C50-MRAM  s/n:19907938 03 (Mimatic#162732)|Y
01|216283|2|1|Bearings seals and o-rings to be replaced.|Y
01|216285|1|1|Master Jaw for H0375M5 N-1735|Y
01|216285|2|1|Jaw Nuts for H0375M5 N-1735|Y
01|216285|3|1|Hard Jaws for H0375M5 N-1735|Y
01|216309|1|1|RGA#CUR-60772/|Y
01|216309|1|2|Repair of C50RAM-ER40-215TS-110P s/n:64653 02|Y
01|216309|1|3|(Mimatic#184455)|Y
01|216309|2|1|Bearings seals and o-rings to be replaced.|Y
01|216312|5|1|TG5200750-Z80N|Y
01|216315|1|1|BT40 Hydraulic Chuck 20mm G/L 90mm MAS/BT Form AD+B w/|Y
01|216315|1|2|center coolant hole w/ Secure Lock|Y
01|216315|2|1|BT40 Hydraulic Chuck 20mm G/L 90mm MAS/BT Form AD+B w/|Y
01|216315|2|2|center coolant hole w/out Secure Lock|Y
01|216315|3|1|NBT40 Hydraulic Chuck 20mm G/L 120mm MAS/BT Form AD+B|Y
01|216315|3|2|w/ center coolant hole w/out Secure Lock|Y
01|216321|1|1|RGA#LVR-60752/|Y
01|216321|1|2|Repair of MNZ20-SK16X-ICE-12K s/n:19903864 15|Y
01|216321|1|3|(Mimatic#193568)|Y
01|216321|2|1|Bearings seals and o-rings to be replaced.|Y
01|216321|4|1|RGA#LVR-60752/|Y
01|216321|4|2|Repair of MNZ20-SK16X-ICE-12K s/n:20902074 04|Y
01|216321|5|1|Bearings seals o-rings and output spindle to be|Y
01|216321|5|2|replaced.|Y
01|216321|7|1|RGA#LVR-60752/|Y
01|216321|7|2|Repair of MNZ20-SK16X-ICE-12K s/n:20905017 19|Y
01|216321|8|1|Bearings seals o-rings drive keys and output spindle|Y
01|216321|8|2|to be replaced.|Y
01|216321|10|1|RGA#LVR-60752/|Y
01|216321|10|2|Repair of MNZ20-SK16Z-ICE-12K s/n:20902426 03|Y
01|216321|10|3|(Mimatic#193643)|Y
01|216321|11|1|Bearings seals o-rings and output spindle to be|Y
01|216321|11|2|replaced.|Y
01|216321|13|1|RGA#LVR-60752/|Y
01|216321|13|2|Repair of MNZ20-SK16Z-ICE-12K s/n:20905241 07|Y
01|216321|13|3|(Mimatic#193643)|Y
01|216321|14|1|Bearings seals and o-rings to be replaced.|Y
01|216346|2|1|ALL SALES ARE FINAL|Y
01|216351|8|1|Overstock discount quoted.|Y
01|216359|1|1|Additional 16% Flash Sale discount applied.|Y
01|216359|1|2|This special price is only valid for PO place between|Y
01|216359|1|3|5/20/24 - 5/31/24|Y
01|216385|1|1|MAX HT 1000mm (39.3); MAX W 800mm (31.4)|Y
01|216396|1|1|**NET Price**|Y
01|216396|1|2|Demo/Used unit SN#2J0108 - Sold AS-IS|Y
01|216396|1|3|90 day warranty from invoice date.|Y
01|216396|1|4|*Includes 1x cooling station 2x SF-POTs|Y
01|216402|1|1|Ref. TCE-96911|Y
01|216407|12|1|A tariff surcharge may be added to this quotation in|Y
01|216407|12|2|the event of a sustained tariff increase on the|Y
01|216407|12|3|importation of this product.  Any surcharge will be|Y
01|216407|12|4|disclosed prior to acceptance of an order.|Y
01|216420|1|1|Replacement for TAT-250 SN:4022 RGA# 60523|Y
01|216430|1|1|Quoted at NET price.|Y
01|216435|1|1|Qty break 2 pcs:|Y
01|216435|1|2|Qty break 3 pcs:|Y
01|216435|1|3|Delivery for 2-3 Pieces: 4 Weeks|Y
01|216435|1|4|These are custom application units. Application must be|Y
01|216435|1|5|approved. Once a PO has been issued these cannot be|Y
01|216435|1|6|cancelled or returned.|Y
01|216435|4|1|Lyndex-Nikken to make positioning block upon receipt of|Y
01|216435|4|2|spindle drawing information.|Y
01|216439|2|1|CC12-C4(AC410K)|Y
01|216439|3|1|CC07-C4(AC410K)|Y
01|216439|5|1|NIT40-Q26-50|Y
01|216464|1|1|Additional 20% Overstock Promo discount applied.|Y
01|216464|1|2|Once a PO is placed this item cannot be cancelled or|Y
01|216464|1|3|returned.|Y
01|216482|2|1|Option #2 - Table with Fanuc Servo Motor|Y
01|216482|2|2|*Needs Hydraulic Source for Braking*|Y
01|216482|3|1|Hydraulic Pump and Tank for Options #1 & #2.|Y
01|216482|5|1|Option #3 - Table with Fanuc Servo Motor and Built In|Y
01|216482|5|2|Air/Hydraulic Booster Pump and Reservoir.|Y
01|216482|5|3|*This option will only need air line supplied to table|Y
01|216482|5|4|for braking.*|Y
01|216482|7|1|Installations are quoted at a NET price only.|Y
01|216494|8|1|A tariff surcharge may be added to this quotation in|Y
01|216494|8|2|the event of a sustained tariff increase on the|Y
01|216494|8|3|importation of this product.  Any surcharge will be|Y
01|216494|8|4|disclosed prior to acceptance of an order.|Y
01|216497|1|1|CNC401 ROTARY TABLE WITH MOTOR FOR FADAL 6030|Y
01|216501|1|1|CNC202FA-M SN: 25049T|Y
01|216501|1|2|RGA#TAR-60674|Y
01|216508|8|1|INCLUDES A TOTAL OF 8 HOURS FOR INSTALL & TRAINING|Y
01|216528|1|1|Please note this item is non standard stock.|Y
01|216528|1|2|Once a purchase order is placed it cannot be|Y
01|216528|1|3|cancelled or returned.|Y
01|216532|5|1|Price reflects a purchase order of 1~4 holders.|Y
01|216532|5|2|This tool is Special once a purchase order is placed|Y
01|216532|5|3|it cannot be cancelled or returned.|Y
01|216532|6|1|Price reflects a purchase order of 5~9 holders.|Y
01|216532|6|2|This tool is Special once a purchase order is placed|Y
01|216532|6|3|it cannot be cancelled or returned.|Y
01|216536|12|1|Pull stud for Hwacheon Vesta 1000|Y
01|216536|13|1|Pull stud for MAG Fadal VCM 4020FX|Y
01|216540|1|1|Additional 20% Overstock Promo discount applied.|Y
01|216540|1|2|Please note: This item cannot be cancelled or returned|Y
01|216540|1|3|upon receipt of PO.|Y
01|216540|2|1|20% Overstock Promotion applied only to MCAT0-C1-135U|Y
01|216559|1|1|PRICE REMOVES RT CABLES AS THESE ARE ALREADY SUPPLIED|Y
01|216559|1|2|WITH EXISTING TABLE|Y
01|216561|1|1|**NET Price**|Y
01|216561|1|2|Part# TBD|Y
01|216561|1|3|HSK63A AngleHead ER16 65mm Pitch Tapered Pin w/ Wrench|Y
01|216561|1|4|INTERNAL COOLANT|Y
01|216561|2|1|**NET Price**|Y
01|216561|2|2|Part# TBD|Y
01|216561|2|3|HSK63A AngleHead ER16 65mm Pitch Tapered Pin w/ Wrench|Y
01|216561|2|4|EXTERNAL COOLANT|Y
01|216565|1|1|Additional 20% overstock discount applied.|Y
01|216565|1|2|Final sale for this item.|Y
01|216577|1|1|SPECIAL FLASH SALES DISCOUNT - EXPIRES 5/31/24|Y
01|216578|2|1|A tariff surcharge of 8% will be added to every order|Y
01|216578|2|2|placed after September 1st 2025(until further notice).|Y
01|216578|2|3|This surcharge will be acknowledged upon acceptance|Y
01|216578|2|4|of every order.|Y
01|216583|5|1|Quoted at NET price. This item is DIN modified once|Y
01|216583|5|2|a purchase order is placed it cannot be cancelled or|Y
01|216583|5|3|returned.|Y
01|216583|8|1|Quoted at NET price. This item is DIN modified once|Y
01|216583|8|2|a purchase order is placed it cannot be cancelled or|Y
01|216583|8|3|returned.|Y
01|216585|14|1|Pull stud drawing sent along w/ quote via email.|Y
01|216586|4|1|PLEASE NOTE: This item is special non-standard stock.|Y
01|216586|4|2|Once a PO is placed it cannot be cancelled or returned.|Y
01|216586|10|1|PLEASE NOTE: This item is special nonstandard stock.|Y
01|216586|10|2|Once a PO is placed it cannot be cancelled or returned|Y
01|216588|1|1|0.8M POWER CABLE (28-11) STANDARD FANUC|Y
01|216588|1|2|90 - 90 CONNECTORS|Y
01|216588|1|3|FOR CNC302FA SN: 8207 ON TAKUMI H16|Y
01|216591|1|1|We do not offer this one in coolant-thru.|Y
01|216591|1|2|Quoting in case the customer still needs.|Y
01|216597|1|1|Includes Haas motor and cables.|Y
01|216597|1|2|Machine must have third party software option|Y
01|216608|1|1|Level 1 - Basic repairchange bearing seals & o-rings|Y
01|216608|2|1|Level 2 - Full repair (Level 1 + change worm wheel|Y
01|216608|2|2|and worm gear. Use the casting and motor.|Y
01|216613|1|1|RGA#LVR-60796/|Y
01|216613|1|2|Repair of OKLT1-ER20Z-S s/n:AL011 (Alps#OK113-36000)|Y
01|216613|2|1|Bearings o-rings collet nut and spindle cover to be|Y
01|216613|2|2|replaced.|Y
01|216613|4|1|RGA#LVR-60796/|Y
01|216613|4|2|Repair of OKLT1-ER20Z-S s/n:AL012 (Alps#OK113-36000)|Y
01|216613|5|1|Bearings o-rings collet nut & spindle to be replaced|Y
01|216619|1|1|1st Batch/978273 Triumph *DWG saved in Teams File.|Y
01|216622|2|1|Additional 20% Overstock Promo discount applied.|Y
01|216622|2|2|Please note this item cannot be cancelled or returned|Y
01|216622|2|3|upon receipt of PO.|Y
01|216622|3|1|20% Overstock Promo discount applied only to:|Y
01|216622|3|2|W15R5-1375-5.96|Y
01|216625|1|1|RGA#LVR-60807/|Y
01|216625|1|2|Repair of MNZ20-SK16Z-ICE-12K s/n:120902100 01|Y
01|216625|1|3|(Mimatic#193643)|Y
01|216625|2|1|Bearings seals o-rings and output spindle to be|Y
01|216625|2|2|replaced.|Y
01|216625|4|1|RGA#LVR-60807/|Y
01|216625|4|2|Repair of MNZ20-SK16X-ICE-12K s/n:22905415 01|Y
01|216625|4|3|(Mimatic#193568)|Y
01|216625|5|1|Bearings seals o-rings and output spinlde to be|Y
01|216625|5|2|replaced.|Y
01|216625|7|1|RGA#LVR-60807/|Y
01|216625|7|2|Repair of MNZ20-SK16X-ICE-12K s/n:20905017 03|Y
01|216625|7|3|(Mimatic#193568)|Y
01|216625|8|1|Bearings seals o-rings and output spinlde to be|Y
01|216625|8|2|replaced.|Y
01|216640|1|1|RGA#LVR-60818/|Y
01|216640|1|2|Repair of OKL3-ER32X s/n:AL1161 (Alps#OK101-14000)|Y
01|216640|2|1|Bearings o-rings collet nut and spindle to be|Y
01|216640|2|2|replaced.|Y
01|216642|1|1|Fanuc Control|Y
01|216642|2|1|Power and Feed Back Cables from Table to Bulkhead|Y
01|216642|4|1|Mits Control (Kitamura)|Y
01|216642|5|1|Power and Feed Back Cables from Table to Bulkhead|Y
01|216642|7|1|Okuma - Includes Power and feedback cables to machine|Y
01|216642|7|2|bulkhead|Y
01|216642|9|1|This is the table that you purchased the last time|Y
01|216642|10|1|Power and Feed Back Cables from Table to Bulkhead|Y
01|216649|2|1|P/N: HSK100A-FMH22-47-150|Y
01|216649|2|2|HSK100A Taper 22mm Face Mill Holder OD47mm 105mm g.l.|Y
01|216653|1|1|HSK63A Angle head;FD=22mm; NO COOLANT; L=187mm|Y
01|216653|1|2|1:1 GEAR MAX 30Nm 8000 RPM|Y
01|216653|1|3|REF DRWG # 00028228|Y
01|216653|3|1|HSK63A Angle head;FD=22mm; NO COOLANT; L=187mm|Y
01|216653|3|2|1:1 GEAR MAX 30Nm 8000 RPM|Y
01|216653|3|3|REF DRWG # 00028228|Y
01|216655|1|1|5AX-201FA-M SN:5559|Y
01|216655|1|2|TAR-60804|Y
01|216658|1|1|NCAT40-SF3-130MT|Y
01|216658|1|2|NCAT40 DualContact Shrink Fit Holder 3mm Mold Type 25K|Y
01|216658|2|1|NCAT40-SF3-160MT|Y
01|216658|2|2|NCAT40 DualContact Shrink Fit Holder 3mm Mold Type 25K|Y
01|216658|3|1|NCAT40-SF4-130MT|Y
01|216658|3|2|NCAT40 DualContact Shrink Fit Holder 4mm Mold Type 25K|Y
01|216658|4|1|NCAT40-SF4-160MT|Y
01|216658|4|2|NCAT40 DualContact Shrink Fit Holder 4mm Mold Type 25K|Y
01|216658|5|1|NCAT40-SF6-130MT|Y
01|216658|5|2|NCAT40 DualContact Shrink Fit Holder 6mm Mold Type 25K|Y
01|216658|6|1|NCAT40-SF6-160MT|Y
01|216658|6|2|NCAT40 DualContact Shrink Fit Holder 6mm Mold Type 25K|Y
01|216658|7|1|NCAT40-SF10-130MT|Y
01|216658|7|2|NCAT40 DualContact Shrink Fit Holder 10mm Mold Type 25K|Y
01|216658|8|1|NCAT40-SF10-160MT|Y
01|216658|8|2|NCAT40 DualContact Shrink Fit Holder 10mm Mold Type 25K|Y
01|216658|9|1|NCAT40-SF12-130MT|Y
01|216658|9|2|NCAT40 DualContact Shrink Fit Holder 12mm Mold Type 25K|Y
01|216658|10|1|NCAT40-SF12-130MT|Y
01|216658|10|2|NCAT40 DualContact Shrink Fit Holder 12mm Mold Type 25K|Y
01|216660|1|1|Cheersun BOAT #05152401: No INS Req'd.|Y
01|216660|2|1|Cheersun BOAT #05152401: No INS Req'd.|Y
01|216660|3|1|Cheersun BOAT #05152401: No INS Req'd.|Y
01|216660|4|1|Cheersun BOAT #05152401: No INS Req'd.|Y
01|216660|5|1|Cheersun BOAT #05152401: No INS Req'd.|Y
01|216664|4|1|Additional 20% overstock promotion added.|Y
01|216664|4|2|Final Sale.|Y
01|216668|1|1|HSK63A-MDSK10-135|Y
01|216673|1|1|Includes external cable set.|Y
01|216673|6|1|15 Setrite 3 jaw scroll chuck with adapter plate.|Y
01|216673|8|1|Includes external cable set.|Y
01|216679|1|1|Qty (3) In Stock|Y
01|216687|1|1|RGA#TOR-60808/|Y
01|216687|1|2|Repair of SF-START2-UNIT-200 s/n: 2J7122|Y
01|216694|1|1|NET ea price. Special non cancelable not returnable|Y
01|216712|3|1|Quoted as 10~29 tools.|Y
01|216712|6|1|C8-SK25-195-J|Y
01|216712|6|2|PSC C8 Slim Chuck SK25 JetSlotNut 10K|Y
01|216712|6|3|Quoted as 10~19 tools.|Y
01|216715|2|1|This is a discontinued part.|Y
01|216715|2|2|Once stock is depleted item cannot be backordered.|Y
01|216718|1|1|5AX-2MT-105-120 SN:8283F|Y
01|216718|1|2|TAR-60442|Y
01|216721|1|1|Rotary table without faceplate.  Customer to take care|Y
01|216721|1|2|of any risers needed as well as workholding adapters.|Y
01|216721|2|1|Lyndex Nikken will integrate the rotary table into the|Y
01|216721|2|2|Hardinge V480 VMC and control.  This is a NET Charge.|Y
01|216722|3|1|1 in stock/ 2-pcs ETA to L-N 06/07 and balance due|Y
01|216722|3|2|07/18.|Y
01|216729|1|1|Please note: This item is special non-standard stock.|Y
01|216729|1|2|Once a PO is placed it cannot be cancelled or returned.|Y
01|216729|12|1|Please note: This item is special non-standard stock.|Y
01|216729|12|2|Once a PO is placed it cannot be cancelled or returned.|Y
01|216739|4|1|BT50-SL40CN-105|Y
01|216739|4|2|BT50 End Mill Holder Centre Through Coolant for CombatZ|Y
01|216739|5|1|ST40-COMZ80-150|Y
01|216739|5|2|Combat Z Drill ST Shank F40mm Drill F80mm GL 150mm|Y
01|216743|1|1|Please note: This item is special non-standard stock.|Y
01|216743|1|2|Once a PO is placed it cannot be cancelled or returned|Y
01|216743|1|3|**QTY BREAK NET PRICING:|Y
01|216743|1|4|250-499 pcs: $28.00 ea/net|Y
01|216743|1|5|500-999 pcs: $24.00 ea/net|Y
01|216743|1|6|1000+   pcs: $22.00 ea/net|Y
01|216743|1|7|**PRICING IS VALID UNTIL 12/31/24**|Y
01|216743|2|1|A tariff surcharge may be added to this quotation in|Y
01|216743|2|2|the event of a sustained tariff increase on the|Y
01|216743|2|3|importation of this product.  Any surcharge will be|Y
01|216743|2|4|disclosed prior to acceptance of an order.|Y
01|216757|1|1|T32218 is obsolete...replaced by T32207.|Y
01|216769|1|1|Special w/ larger body per print sent to Risa|Y
01|216769|2|1|Special w/ larger body per print sent to Risa|Y
01|216780|1|1|**NET Pricing**   5 piece MOQ|Y
01|216780|1|2|Part#: B3007-0016-6.00|Y
01|216780|1|3|BT30 ER16 Collet Chuck HiTorque BearingNut 30K 6.00GL|Y
01|216780|1|4|Please note: This is special non-standard stock. Once|Y
01|216780|1|5|a PO is placed it cannot be cancelled or returned.|Y
01|216780|1|6|.|Y
01|216780|1|7|QTY NET PRICING:|Y
01|216780|1|8|5-9 pcs: $264 ea/NET|Y
01|216780|1|9|10+ pcs: $204 ea/NET|Y
01|216804|19|1|M22/M24 TAP COLLET|Y
01|216808|1|1|NST250OSP4-M Rotary Table|Y
01|216808|8|1|Adapter Plate for the NST250 faceplate.|Y
01|216810|1|1|***OPTION #1***|Y
01|216810|2|1|***OPTION #2***|Y
01|216848|1|1|Additional 20% Overstock Promo Discount applied. Once|Y
01|216848|1|2|a PO is placed it cannot be cancelled or returned.|Y
01|216848|2|1|Overstock Promotion applied only to BT30-VC13-60|Y
01|216855|3|1|P/N: NBT30-SF6-90CP|Y
01|216855|3|2|Dual Contact BT30 Taper 6mm Shrink Fit Holder w/|Y
01|216855|3|3|90mm g.l. and coolant ports|Y
01|216878|1|1|H013MC10|Y
01|216882|5|1|****PLEASE NOTE THAT SPANNER WRENCH 100TG-SPAN HAS|Y
01|216882|5|2|****BEEN DISCONTINUED.  040-SPAN REPLACED THIS ITEM.|Y
01|216885|19|1|M22/M24 TAP COLLET|Y
01|216886|1|1|Includes cable set.|Y
01|216886|2|1|9730-02623 10 3-jaw MKIV Series Pneumatic Power|Y
01|216886|2|2|includes one set of 1.5mm x 60 degree serrated master|Y
01|216886|2|3|jaws t-nuts mounting bolts owner's manual|Y
01|216886|3|1|Adpter plate for chuck|Y
01|216886|4|1|Optional Lever Control Package for MKIV Series|Y
01|216886|5|1|Optional Foot Pedal Control Package for MKIV Series|Y
01|216887|1|1|Center Height 230MM needs riser for 2ft swing|Y
01|216887|2|1|Center Height 170MM need riser to match CNC321 and|Y
01|216887|2|2|2ft swing request.|Y
01|216897|19|1|L-N Sales (Yas Saeki) will provide Setup support and|Y
01|216897|19|2|basic training.|Y
01|216903|1|1|HSK63A-MDSK20-105-J|Y
01|216903|1|2|HSK63A Major Dream Slim Chuck SK20 15K with J-type nut|Y
01|216903|2|1|HSK63A-SK20-105P-J|Y
01|216903|2|2|HSK63A Slim Chuck SK20 20K with J-type nut|Y
01|216903|3|1|HSK63A-C25-100|Y
01|216903|3|2|HSK63A Milling Chuck 25mm|Y
01|216917|1|1|RGA#LVR-60827/|Y
01|216917|1|2|Repair of MZQT5-CT40Z-ICE s/n:21907697 05|Y
01|216917|1|3|(Mimatic#103667)|Y
01|216917|2|1|Bearings seals and o-rings to be replaced.|Y
01|216920|19|1|L-N Sales (Yas Saeki) will provide Setup support and|Y
01|216920|19|2|basic training.|Y
01|216921|1|1|BMT45-ER16-AD-ICE|Y
01|216921|2|1|BMT45-ER16-AD-ICE|Y
01|216922|1|1|BT50-FMA50.8-150-OH-ID|Y
01|216922|2|1|BT50-FMB40-150-OH-ID|Y
01|216922|3|1|BT50-FMC22-60-OH-ID|Y
01|216922|4|1|BT50-FMC22-150-OH-ID|Y
01|216922|5|1|BT50-FMC22-200-OH-ID|Y
01|216922|6|1|BT50-FMC25.4-105-OH-ID|Y
01|216922|7|1|BT50-FMC27-105-OH-ID|Y
01|216922|8|1|BT50-FMC32-105-OH-ID|Y
01|216922|9|1|BT50-FMC32-150-OH-ID|Y
01|216922|10|1|BT50-FMP38.1-150-125-OH-ID|Y
01|216922|11|1|BT50-MMC32-150-ID|Y
01|216922|12|1|BT50-MMC32-350-ID|Y
01|216922|13|1|BT50-MRC16-100-ID|Y
01|216922|14|1|BT50-MRC16-150-ID|Y
01|216922|15|1|BT50-MRC16-200-ID|Y
01|216922|16|1|BT50-MRC20-150-ID|Y
01|216922|17|1|BT50-SLM40-120-ID|Y
01|216922|18|1|BT50-SLM50.8-125-ID|Y
01|216922|19|1|ST32-FM16-70-OH|Y
01|216922|20|1|ST32-MRC16-200|Y
01|216923|3|1|#26 Bolt for H018M10>Part# pending|Y
01|216925|4|1|INSTALL COOLANT TUBES BEFORE SHIPPING TO LEKTRON|Y
01|216976|1|1|RGA#LVR-60822/|Y
01|216976|1|2|Repair of MZMP47-ER32X-OFF s/n:91990 01(Mimatic#124021)|Y
01|216976|2|1|Bearings seals o-rings and input spindle with gear to|Y
01|216976|2|2|be replaced.|Y
01|216976|4|1|RGA#LVR-60822/|Y
01|216976|4|2|Repair of MZMP47-ER32X-OFF-ICE s/n:73634 10|Y
01|216976|4|3|(Mimatic#124255)|Y
01|216976|5|1|Bearings seals o-rings output spindle and input|Y
01|216976|5|2|spindle with gear to be replaced.|Y
01|216995|1|1|1 in stock 5 expected by 6/15|Y
01|217005|1|1|Additional 20% Overstock Promotion discount applied.|Y
01|217005|1|2|Once a PO is placed this item cannot be cancelled or|Y
01|217005|1|3|returned.|Y
01|217005|2|1|Overstock Promotion applied only to VDI40-OD10X-LG-OHB8|Y
01|217010|1|1|This is a non-standard item and considered special.|Y
01|217010|1|2|Once a PO has been issued it cannot be cancelled or|Y
01|217010|1|3|returned.|Y
01|217018|6|1|N100LCK  SK20 Torque Wrench|Y
01|217018|7|1|SKL-20-TLS-HD   SK20 Spannerhead|Y
01|217025|1|1|replaces SKN-10B (GH)|Y
01|217025|2|1|replaces SKN-6WB(GH)|Y
01|217029|1|1|Part Number TBD / Howa #H3YS6 U-1128C per print|Y
01|217029|1|2|Quoted at NET price.|Y
01|217037|1|1|Additional 20% Overstock Promo discount applied.|Y
01|217037|1|2|Once a PO is placed this item cannot be cancelled or|Y
01|217037|1|3|returned.|Y
01|217037|2|1|Overstock Promotion applied only to B3002-0750-4.97|Y
01|217046|1|1|HSK63A Angle head;FD=22mm; NO COOLANT; L=187mm|Y
01|217046|1|2|1:1 GEAR MAX 30Nm 8000 RPM|Y
01|217046|1|3|REF DRWG # 00028228|Y
01|217046|3|1|HSK63A Angle head;FD=22mm; NO COOLANT; L=187mm|Y
01|217046|3|2|1:1 GEAR MAX 30Nm 8000 RPM|Y
01|217046|3|3|REF DRWG # 00028228|Y
01|217049|1|1|CAT40-SF21-80CP  CAT40 Shrink Fit 21mm w/Coolant Ports|Y
01|217049|1|2|Net price is based upon a purchase order of 5 to 9|Y
01|217049|1|3|toolholders.|Y
01|217049|2|1|CAT40-SF21-80CP  CAT40 Shrink Fit 21mm w/Coolant Ports|Y
01|217049|2|2|Net price is based upon a purchase order of 10+|Y
01|217049|2|3|toolholders.|Y
01|217050|1|1|HSK63A-MDSK20-105-J|Y
01|217050|1|2|HSK63A Major Dream Slim Chuck SK20 15K with J-type nut|Y
01|217050|2|1|HSK63A-SK20-105P-J|Y
01|217050|2|2|HSK63A Slim Chuck SK20 20K with J-type nut|Y
01|217050|3|1|For HSK63A-MDSK20-105-J & HSK63A-SK20-105P-J.|Y
01|217050|5|1|HSK63A-C25-100|Y
01|217050|5|2|HSK63A Milling Chuck 25mm|Y
01|217065|2|1|Includes: Drive unit short bar fiber optic cable|Y
01|217065|2|2|communications cable bulkhead cables external cables|Y
01|217065|2|3|parameter changes service time and tavel.|Y
01|217076|1|1|Additional 20% Overstock Promotion discount applied.|Y
01|217076|1|2|Once a PO is placed this item cannot be cancelled or|Y
01|217076|1|3|returned.|Y
01|217076|2|1|Overstock Promotion applied only to H63A-SF0625-6.30|Y
01|217078|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|217109|3|1|*** ONLY NEEDED IF CUSTOMER WANTS TO USE THE BRAKE ***|Y
01|217122|1|1|PRE-E346PLUS-BMT45 - BMT45 PRESETTER|Y
01|217130|1|1|HSK63A-SK20C-120P-J|Y
01|217130|1|2|HSK63A Slim Chuck SK20 HiSpeed 25K with J type Nut|Y
01|217130|4|1|*SP NET PRICE|Y
01|217130|5|1|*SP NET PRICE|Y
01|217130|6|1|*SP NET PRICE|Y
01|217138|1|1|Additional 20% Overstock Promo discount applied.|Y
01|217138|1|2|This item cannot be cancelled or returned upon receipt|Y
01|217138|1|3|of PO.|Y
01|217138|2|1|Additional 20% Overstock Promo discount applied. This|Y
01|217138|2|2|item cannot be cancelled or returned upon receipt of PO|Y
01|217138|3|1|Overstock Promotion applied only to: QCFC42-15M-EMR|Y
01|217138|3|2|QCFC42-30M-EMR|Y
01|217146|1|1|Additional 20% overstock promotional discount applied.|Y
01|217146|1|2|These items cannot be cancelled or returned once PO is|Y
01|217146|1|3|received.|Y
01|217147|1|1|5AX-130FA-M SN:4998|Y
01|217147|1|2|RGA#TAR-60871|Y
01|217149|4|1|CCK25-5/8|Y
01|217153|3|1|The wrench above is part of our Overstock Promotion.|Y
01|217153|3|2|All sales are final.|Y
01|217167|9|1|We do not offer 6 gage length. This holder is DIN|Y
01|217167|9|2|coolant thru the flange) we can plug the DIN holes.|Y
01|217167|9|3|Overstock extra discount (20%) is applied.|Y
01|217167|14|1|This wrench will work with the 100TG chucks.|Y
01|217168|1|1|replaces NC4007-0016-3.50|Y
01|217168|2|1|replaces NC4017-0016-6.00|Y
01|217168|3|1|NC4007-0020-2.50|Y
01|217168|4|1|replaces NC4017-0020-4.00|Y
01|217168|5|1|replaces NC4007-0032-3.13|Y
01|217168|6|1|replaces NC4017-0032-5.00|Y
01|217176|2|1|Not available in sealed|Y
01|217187|2|1|SK20 Z ICE LT BMT55 ER32 1:1 6500rpm for TM-4000Y2|Y
01|217187|2|2|Special Order. Net Price Each. MOQ: 5|Y
01|217187|2|3|Delivery: 16Weeks (DESIGN 4WK + MFG 12WK + Ship 2WK)|Y
01|217191|4|1|NET PRICE|Y
01|217203|1|1|Precio 1-2 piezas|Y
01|217203|2|1|These are non-standard stock items and considered|Y
01|217203|2|2|specials.  Once PO has been issuedthese items cannot|Y
01|217203|2|3|be cancelled or returned.|Y
01|217203|4|1|Precio de 3-4 piezas|Y
01|217203|7|1|Precio de 5-9 piezas|Y
01|217203|10|1|Precio por mas de 10 piezas|Y
01|217207|1|1|1st Batch/980546/Triumph|Y
01|217207|2|1|1st Batch|Y
01|217211|1|1|SN: 5839|Y
01|217211|1|2|TABLE MFG 2019 BUT STILL NEW IN BOX|Y
01|217211|1|3|SPECIAL 1 TIME PRICING|Y
01|217220|2|1|CAT40 HAAS MACHINE POSITIONING BLOCK|Y
01|217220|4|1|THIS MAY NOT BE THE CORRECT ER25 TAP COLLET BUT|Y
01|217220|4|2|I USED IT TO ILLUSTRATE THE PRICING.|Y
01|217221|1|1|OVERSTOCK promo discount of 20% added.|Y
01|217221|1|2|Final Sale|Y
01|217237|1|1|Okuma #T129-530-000-57|Y
01|217247|1|1|OIL CHANGE NIKKEN ROTARY TABLES|Y
01|217247|1|2|SHOW KLM HAS THE FOLLOWING TABLES|Y
01|217247|1|3|CNCZ100-2W X 10 5AX-130 X2 CNCZ180 X 1|Y
01|217259|3|1|OVERSTOCK ITEM WITH ADDITIONAL 20% APPLIED|Y
01|217259|9|1|This applies to part #C5037-0020-8.00 please note this|Y
01|217259|9|2|can not be cancelled or returned once PO received.|Y
01|217275|1|1|Special one-time additional discount has been applied.|Y
01|217280|2|1|This option can be drilled down to your specification.|Y
01|217282|1|1|5 in Stock ETA of remaining 1 pcs: 5 Weeks|Y
01|217282|1|2|Custom application unit - application must be approved.|Y
01|217282|1|3|Once a PO has been issued these cannot be cancelled or|Y
01|217282|1|4|returned.|Y
01|217284|1|1|For CNC260FA SN:9900|Y
01|217284|1|2|RGA#TAR-60813|Y
01|217284|1|3|Full rebuild of the table include labor all basic|Y
01|217284|1|4|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|217301|1|1|Backup Table for Existing Table SERIAL #1706|Y
01|217301|1|2|Customer is responsible for installation and hydraulics|Y
01|217317|1|1|Req.INS/Install S5/8-18X1/2|Y
01|217317|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|217317|3|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|217317|4|1|Req.INS/Install E32-NUT|Y
01|217317|5|1|Req.INS/Install S3/4-16X11/16|Y
01|217317|6|1|Req.INS/Install S3/4-16X11/16|Y
01|217317|7|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|217317|8|1|Req.INS/Install E20-NUT-G & ER20-SCREW(C)|Y
01|217318|1|1|Service call for Hathor Six s/n:5380|Y
01|217318|1|2|This is a time based estimate.|Y
01|217318|1|3|Any parts that would be required would be additional.|Y
01|217325|1|1|5AX-DD200BF2 SN:1080|Y
01|217325|1|2|RGA#TAR-60837|Y
01|217327|1|1|RGA#LVR-60823/|Y
01|217327|1|2|Repair of MZQT47-ER32Z-SUB-ICE s/n: 64037 01|Y
01|217327|1|3|(Mimatic#124874)|Y
01|217327|2|1|Bearings seals o-rings input spindle asnd damaged|Y
01|217327|2|2|gears to be replaced.|Y
01|217333|1|1|To be installed w/ PSN46E @ Factory|Y
01|217333|1|2|**Needs to be separate line item from PSN46E|Y
01|217333|2|1|To be installed w/ NC5-46-SK10C-75 @ Factory|Y
01|217333|3|1|To be installed with PS-123E @ Factory|Y
01|217333|3|2|**Needs to be a separate line item from PS-123E|Y
01|217333|3|3|Lead Time: 4 Pcs 2 Weeks Balance: 4-5 Weeks ARO|Y
01|217333|4|1|To be installed w/ NC5-46-SK10C-90 @ Factory|Y
01|217333|4|2|Lead Time: 4 Pcs 2 Weeks Balance: 4-5 Weeks ARO|Y
01|217333|5|1|S-NC5-46-SK10C-90B|Y
01|217333|5|2|NC5-46 Slim Chuck SK10 Coolant 15K|Y
01|217333|5|3|To be installed w/ PS-123E @ Factory|Y
01|217333|5|4|**Needs to be a separate line item from PS-123E|Y
01|217333|6|1|To be installed w/ S-NC5-46-SK10C-90B @ Factory|Y
01|217333|7|1|To be installed w/ PS-123E @ Factory|Y
01|217333|7|2|**Needs to be a separate line item from PS-123E|Y
01|217333|8|1|To be installed w/ NC5-46-C20-80 @ Factory|Y
01|217349|4|1|Balluff Chip install and Re-Balance|Y
01|217349|4|2|Balluff Chip P/N: BIS-C-122-04/L|Y
01|217352|2|1|BT30-C16-70|Y
01|217364|1|1|SZM# D047716004|Y
01|217364|1|2|Custom collet per drawing provided by customer|Y
01|217389|3|1|NBT30-SF6-65|Y
01|217391|1|1|special HSK63A-C25-90(G) Hi-Speed Nut|Y
01|217393|1|1|EXTRA DISCOUNT IS BEING EXTENDED FOR A DEMO UNIT.|Y
01|217393|1|2|UNIT IS SUBJECT TO PRIOR SALE.|Y
01|217393|9|1|INCLUDES 2 EIGHT HOURS DAYS TO INSTALL & TRAIN|Y
01|217396|1|1|Discount is based upon an order of 4 tools.|Y
01|217415|3|1|Overstock discount added 20%.  Final Sale|Y
01|217425|1|1|HSK63F-C1.1/4-110 HSK63F Milling Chuck 1.1/4|Y
01|217428|1|1|Overstock - 20% extra discount non-cancellable and|Y
01|217428|1|2|non-returnable once a PO has been placed.|Y
01|217435|4|1|We do not offer 40mm|Y
01|217437|1|1|Sn#  2J7049|Y
01|217437|1|2|*Demo unit- sold AS-IS*|Y
01|217437|1|3|6-month warranty from invoice date|Y
01|217437|1|4|*NET price|Y
01|217440|1|1|RGA#CUR-60866/|Y
01|217440|1|2|Repair of H63ARAM-ER25-187OTC s/n:45829 02|Y
01|217440|1|3|(Mimatic#179165)|Y
01|217440|2|1|Bearings seals o-rings to be replaced.|Y
01|217447|1|1|RGA#LVR-60848/|Y
01|217447|1|2|Repair of BMT55-SK20X-ICE s/n:21900212 07|Y
01|217447|1|3|(Mimatic#187162)|Y
01|217447|2|1|Bearings seals o-rings to be replaced.|Y
01|217447|4|1|RGA#LVR-60848/|Y
01|217447|4|2|Repair of BMT55-SK20Z-85-ICE s/n:21903040 02|Y
01|217447|4|3|(Mimatic#192910)|Y
01|217447|5|1|Bearings seals o-rings to be replaced.|Y
01|217455|1|1|CNC180AR21-400W|Y
01|217455|1|2|Rotary Table 180mm AirBrake AR21 Control 400W|Y
01|217455|2|1|NCT200EAR21-750W|Y
01|217455|2|2|Rotary Table 130mm AirBrake AR21 Control w/o Face Plate|Y
01|217455|3|1|Adapter Plate|Y
01|217455|3|2|Special Order Item. Net Price Each. Non Cancelable.|Y
01|217456|1|1|This is set up with Air Braking.  Hydraulic Braking is|Y
01|217456|1|2|also available but would require a quote revision as|Y
01|217456|1|3|there would be added cost for hydraulic pump and tank.|Y
01|217456|2|1|This includes a full interface kit and installation.|Y
01|217456|2|2|This will replace the existing wiring and cabling for|Y
01|217456|2|3|rotary table in this machine.|Y
01|217461|1|1|NCAT50-C1.1/4-135U-IDU-DIN-M|Y
01|217461|2|1|NCAT50-SF0750-6.30CP-DIN-M|Y
01|217461|4|1|NC5006-0750-6.00CP-DIN-M|Y
01|217461|5|1|NC5006-1250-6.00CP-DIN-M|Y
01|217478|1|1|NET price Special - Non-cancellable and non-returnable|Y
01|217478|1|2|once a PO has been placed.|Y
01|217478|1|3|**For DIN Flange-Thru Coolant Standard holders also|Y
01|217478|1|4|available.|Y
01|217482|1|1|RGA#LVR-60480/|Y
01|217482|1|2|Repair of BMT65-ER32Z-MS s/n:77877 04 (Mimatic#186493)|Y
01|217482|2|1|Bearings seals and o-rings to be replaced.|Y
01|217484|3|1|Includes: Drive unit short bar fiber optic cable|Y
01|217484|3|2|communciations cable bulkhead cables external cables|Y
01|217484|3|3|parmeter changes service time and travel.|Y
01|217484|8|1|Installation includes: Drive unit short bar fiber|Y
01|217484|8|2|optic cable communications cable bulkhead cable|Y
01|217484|8|3|external cables parameter changes service time and|Y
01|217484|8|4|travel.|Y
01|217486|1|1|RGA#TOR-60882/|Y
01|217486|1|2|Repair of PF-2|Y
01|217486|3|1|Calibration service included.|Y
01|217489|1|1|BRM-16.05+0.005/0|Y
01|217489|1|2|1-2 pieces|Y
01|217489|2|1|BRM-16.05+0.005/0|Y
01|217489|2|2|2-3 pieces|Y
01|217489|3|1|BRM-16.05+0.005/0|Y
01|217489|3|2|5-9 pieces|Y
01|217489|4|1|BRM-16.05+0.005/0|Y
01|217489|4|2|10+ pieces|Y
01|217494|9|1|BRM-25.0|Y
01|217495|3|1|*Old style- once stock is depleted these will no|Y
01|217495|3|2|longer be available|Y
01|217496|1|1|Please note: We currently have all of the chucks in|N
01|217496|1|2|stock but would prefer to ship ---------------|N
01|217496|1|4|f|N
01|217504|10|1|FOR .165 DRILL|Y
01|217504|11|1|FOR M5 X 0.8 TAP W/ .1940 SHANK|Y
01|217510|1|1|RGA#TOR-60870/|Y
01|217510|1|2|Repair of S20-UMT|Y
01|217510|3|1|Calibration service included.|Y
01|217513|2|1|Charge for etching toolholders and packaging.|Y
01|217513|2|2|Bombardier #AC003011|Y
01|217513|2|3|Please note: Modified tooling is non-cancellable and|Y
01|217513|2|4|non-returnable.|Y
01|217519|1|1|RGA#LVR-60844/|Y
01|217519|1|2|Repair of MZMP47-ER32Z s/n:51123 (Mimatic#124619)|Y
01|217519|2|1|Bearings seals o-rings and output spindle to be|Y
01|217519|2|2|replaced.|Y
01|217521|1|1|RGA#TOR-60854/|Y
01|217521|1|2|Repair of CAT40-UMT200H|Y
01|217521|3|1|Calibration service included|Y
01|217521|5|1|RGA#TOR-60854/|Y
01|217521|5|2|Repair of CAT40-UMT200H|Y
01|217521|8|1|Calibration service included|Y
01|217524|6|1|Labor charges|Y
01|217524|6|2|Service call for KHYAN s/n:4943|Y
01|217524|6|3|This is a time based estimate.|Y
01|217524|6|4|Any parts that would be required would be additional.|Y
01|217524|7|1|A tariff surcharge may be added to this quotation in|Y
01|217524|7|2|the event of a sustained tariff increase on the|Y
01|217524|7|3|importation of this product.  Any surcharge will be|Y
01|217524|7|4|disclosed prior to acceptance of an order.|Y
01|217529|1|1|For CNCZ180LSA-BR2 SN: N/A   RGA#TAR-60901|Y
01|217529|1|2|Full rebuild of the table include labor all basic|Y
01|217529|1|3|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|217532|1|1|**Once a purchase order is received the items|Y
01|217532|1|2|**cannot be returned or cancelled.|Y
01|217533|1|1|Req.INS/for stock *wrench included?|Y
01|217560|8|1|QUOTED AT NET PRICE|Y
01|217568|1|1|Quoted 1p~9p|Y
01|217597|1|1|Special Pancake Cylinder for Nikken 5AX-2002|Y
01|217597|1|2|1000 PSI Max - 2 Port Cylinder|Y
01|217597|1|3|Mounting and size to match existing Nikken cylinders.|Y
01|217597|1|4|This is a Special so pricing is quoted at NET only.|Y
01|217597|2|1|Will need to add one reduction valve to each hydraulic|Y
01|217597|2|2|unit and also will need to reconfigure hydraulic unit|Y
01|217597|2|3|valves and lines so table brake is protected and 5C|Y
01|217597|2|4|can be adjusted from pump pressure setting screen.|Y
01|217597|3|1|Gauge needed for pressure reduction valve stack|Y
01|217597|4|1|Includes travel expenses labor for retrofitting of|Y
01|217597|4|2|new pancake cylinders on 5AX-2002 tables. Also will|Y
01|217597|4|3|install reduction valve stack on hydraulic units and|Y
01|217597|4|4|reconfigure hyd lines and valves to protect table brake|Y
01|217597|4|5|system from over pressure and allow the 5C to have the|Y
01|217597|4|6|higher pressure safely.  This is a NET charge and is|Y
01|217597|4|7|calculated based on doing all 4 machines in one trip.|Y
01|217597|4|8|If C&A chooses to not do all 4 machines at once then|Y
01|217597|4|9|we may need to recalculate the installation fee.  Doing|Y
01|217597|4|10|all 4 machines at same time is preferred if possible.|Y
01|217598|9|1|NET pricing|Y
01|217598|10|1|NET pricing|Y
01|217598|10|2|14 weeks after drawing approval.Non-returnable|Y
01|217598|10|3|non-cancellable|Y
01|217607|3|1|NET Pricing Only|Y
01|217607|4|1|NET Pricing Only|Y
01|217619|1|1|NCAT40-SF12-130CP|Y
01|217619|1|2|NCAT40 DualContact Shrink Fit Holder 12mm 130mm Gage|Y
01|217619|1|3|Length CoolantPorts 25K|Y
01|217643|6|1|Additional 20% overstock promotion applied. Once a PO|Y
01|217643|6|2|is placed this item cannot be cancelled or returned.|Y
01|217643|7|1|Overstock Promo applied only to MCAT40-C3/4F-120U|Y
01|217653|1|1|Seal for CAT50-C1 1/4-105U|Y
01|217653|2|1|Seal for CAT50-C3/4-105U and CAT40-C3/4-85U|Y
01|217657|3|1|ADDITIONAL 10% DISCOUNT FOR AFI LIVE TOOL PROMO|Y
01|217669|2|1|ETA 13-14 weeks delivery to Lyndex-Nikken ARO|Y
01|217673|1|1|*One time discount|Y
01|217680|1|1|Service call for E46LA s/n: TBD|Y
01|217680|1|2|This is a time based estimate.|Y
01|217680|1|3|Any parts that would be required would be additional.|Y
01|217703|1|1|1st Batch/DWG Saved in Teams File|Y
01|217724|3|1|SK10 collets are not available in 9/32. This SK10-7.5|Y
01|217724|3|2|has a collapse range of 0.295 to 0.276 to substitute|Y
01|217724|3|3|instead.|Y
01|217743|2|1|Lyndex-Nikken to make positioning block. Delivery is|Y
01|217743|2|2|upon receipt of spindle drawing confirmation.|Y
01|217752|7|1|L-N Sales Rep Yas Saeki will provide INST support and|Y
01|217752|7|2|Basic training on site.|Y
01|217755|2|1|Meiji Corp Instllation cost 2days|Y
01|217756|6|1|INSTALL COOLANT TUBES BEFORE SHIPPING|Y
01|217763|2|1|Special. Cannot be returned or cancelled|Y
01|217763|3|1|PENDING|Y
01|217768|1|1|1st Batch|Y
01|217769|1|1|1st Batch 1/29:DWG Approved/BT|Y
01|217769|2|1|1st Batch 1/29:DWG Approved/BT|Y
01|217769|3|1|1st Batch/2/19 approvd|Y
01|217769|4|1|1st Batch 1/29:DWG Approved/BT|Y
01|217769|5|1|1st Batch|Y
01|217769|6|1|1st Batch|Y
01|217773|1|1|Quoted at NET Pricing|Y
01|217774|1|1|1st Batch 2/16:DWG Approved/BT|Y
01|217774|2|1|1st Batch 1/29:DWG Approved/BT|Y
01|217774|3|1|Req.INS/T/P Inspection Required|Y
01|217774|4|1|Req.INS/T/P Inspection Required|Y
01|217774|5|1|Req.INS/T/P Inspection Required|Y
01|217774|6|1|Req.INS/T/P Inspection Required|Y
01|217774|7|1|Req.INS/T/P Inspection Required|Y
01|217774|8|1|Req.INS/T/P INS Required.|Y
01|217774|9|1|Req.INS/T/P Inspection Required|Y
01|217774|10|1|T/P Inspection Required|Y
01|217774|11|1|Req.INS/T/P Inspection Required|Y
01|217774|12|1|Req.INS/T/P Inspection Required|Y
01|217774|13|1|T/P Inspection Required|Y
01|217801|1|1|No inspection required.|Y
01|217823|4|1|Quoted at NET price.|Y
01|217823|8|1|Adapter Plate to go from 220 flat back to A2-8.|Y
01|217823|9|1|Quoted at NET price.|Y
01|217823|12|1|For main spindle plus HW-CHK-ADPT-KS10-A28|Y
01|217823|12|2|adapter plate to go from 220 flat back to A2-8|Y
01|217823|13|1|Adapter plate to go from 220 flat back to A2-8|Y
01|217823|15|1|HW-CHK-ADPT-KS08-A25  adapter plate to go from 170|Y
01|217823|15|2|flat back to A2-5.|Y
01|217823|16|1|Quoted at NET price.|Y
01|217836|7|1|**Quoted at NET Price**|Y
01|217836|7|2|Part# C6-EM1500-90|Y
01|217836|7|3|PSC C6 End Mill Holder 1.1/2 ChipHole 25K 90mm GL|Y
01|217836|7|4|**Special custom tool. Once a PO is placed cannot be|Y
01|217836|7|5|cancelled or returned**|Y
01|217836|8|1|**Quoted at NET Price**|Y
01|217836|8|2|Part# C6-EM1500-60|Y
01|217836|8|3|PSC C6 End Mill Holder 1.1/2 ChipHole 25K 60mm GL|Y
01|217836|8|4|**Special custom tool. Once a PO is placed cannot be|Y
01|217836|8|5|cancelled or returned.|Y
01|217836|9|1|A tariff surcharge may be added to this quotation in|Y
01|217836|9|2|the event of a sustained tariff increase on the|Y
01|217836|9|3|importation of this product.  Any surcharge will be|Y
01|217836|9|4|disclosed prior to acceptance of an order.|Y
01|217846|1|1|INCLUDES CABLES INSIDE MOTOR COVER AND MOTOR|Y
01|217846|1|2|HURCO TO ADVISE MOTOR MODEL THAT CAN BE USED|Y
01|217846|1|3|NEEDS TO BE SGM -20 OR -30 SERIES MOTOR (2KW ~ 3KW)|Y
01|217854|1|1|RGA#LVR-60793/|Y
01|217854|1|2|Repair of MZQT47-ER32Z-MS-OFF s/n:20902734 02|Y
01|217854|1|3|(Mimatic#183779)|Y
01|217854|2|1|Bearings seals o-rings housing to be replaced.|Y
01|217854|4|1|RGA#LVR-60793/|Y
01|217854|4|2|Repair of MZQT47-ER32Z-MS-OFF s/n: 20902734 03|Y
01|217854|4|3|(Mimatic#183779)|Y
01|217854|5|1|Bearings seals and o-rings to be replaced.|Y
01|217859|1|1|Tool 127|Y
01|217859|5|1|Tools 3456|Y
01|217863|1|1|Additional 20% Overstock Promotion discount applied.|Y
01|217863|1|2|Once a PO is placed this item cannot be cancelled or|Y
01|217863|1|3|returned.|Y
01|217863|2|1|20% Overstock Promotion - Applied to B3007-0008-2.00|Y
01|217863|2|2|only|Y
01|217868|1|1|RGA#LVR-60801/|Y
01|217868|1|2|Repair of BMT65-ER32Z-72-ICE s/n: 19902697 08|Y
01|217868|1|3|(Mimatic#192967)|Y
01|217868|2|1|Bearings seals o-rings and input & output spindle to|Y
01|217868|2|2|be replaced.|Y
01|217876|1|1|Drawing # ECTABIF125R.00|Y
01|217876|1|2|Arbor W/31.75 Pilot X CAT40 Shank|Y
01|217876|1|3|Net price reflects a Purchase order of 1 Tool.|Y
01|217876|2|1|Drawing # ECTABIF125R.00|Y
01|217876|2|2|Arbor W/31.75 Pilot X CAT40 Shank|Y
01|217876|2|3|Net price reflects a Purchase order of 3 Tools.|Y
01|217876|3|1|Drawing # ECTABIF125R.00|Y
01|217876|3|2|Arbor W/31.75 Pilot X CAT40 Shank|Y
01|217876|3|3|Net price reflects a Purchase order of 5 Tools.|Y
01|217876|4|1|Drawing # ECTABIF125R.00|Y
01|217876|4|2|Arbor W/31.75 Pilot X CAT40 Shank|Y
01|217876|4|3|Net price reflects a Purchase order of 10 Tools.|Y
01|217876|6|1|Drawing # EHAEBIF125R.00|Y
01|217876|6|2|Arbor W/31.75 Pilot X HSK80A Shank|Y
01|217876|6|3|Net price reflects a Purchase order of 1~9 Tools.|Y
01|217876|7|1|Drawing # EHAEBIF125R.00|Y
01|217876|7|2|Arbor W/31.75 Pilot X HSK80A Shank|Y
01|217876|7|3|Net price reflects a Purchase order of 10+ Tools.|Y
01|217880|2|1|Adapter Plate for RMC-20 (Kanetec Permanent Magnetic|Y
01|217880|2|2|Chuck)|Y
01|217880|2|3|Special Order Item. Net Price Each. Non Cancelable.|Y
01|217893|2|1|NC5001-2000-8.00CP|Y
01|217893|2|2|NCAT50 DualContact Shell Mill Holder 2|Y
01|217893|2|3|Quoted at NET pricing|Y
01|217893|2|4|Delivery is 6-8 weeks after drawing approval|Y
01|217894|1|1|Circut Breaker for A21 Controller|Y
01|217894|2|1|Cost to install Breaker on PLC. Cost for 2 days.|Y
01|217894|2|2|Meiji Corp will provide this. We will cover this cost|Y
01|217894|2|3|specially this time.|Y
01|217894|3|1|Expense cost for 3 days and 2 nights for Meiji Corp.|Y
01|217894|3|2|Hotel Meal Gas and etc are included.|Y
01|217903|1|1|Country of Origin=Germany Returnable=No once the|Y
01|217903|1|2|drawscrew is threaded. Restock fee TBD after inspection|Y
01|217903|1|3|FOB Mundelein IL 60060|Y
01|217903|2|1|LN to thread blank draw nut to match customer's|Y
01|217903|2|2|machine drawtube|Y
01|217903|2|3|Delivery is 2-3 days upon receipt specs from customer|Y
01|217905|6|1|Threading of Draw Screw per data provided by Meredith.|Y
01|217905|7|1|Adapter to connect Drawscrew to machine's draw tube|Y
01|217907|1|1|RGA#CUR-60914/|Y
01|217907|1|2|Repair of C50RAM-ER40-215TS-110TP s/n: 64653 01|Y
01|217907|1|3|(Mimatic#184455)|Y
01|217907|2|1|Bearings seals o-rings and damaged flange components|Y
01|217907|2|2|to be replaced.|Y
01|217914|1|1|RAW PART LOAD|Y
01|217914|1|2|EOA GRIPPER FOR PARTS UNDER 20MM|Y
01|217914|1|4|VICE LOADING IS AN ADDITIONAL COST|Y
01|217914|2|1|PART STORAGE AND GRID FOR PARTS UNDER 20MM|Y
01|217914|2|2|EACH QTY HOLDS 16 PARTS|Y
01|217914|2|3|7 ASSEMBLIES PER FACE ON THE EZBOT - 2 FACES MAX|Y
01|217924|3|1|Recap Scale system with +/-2 includes mounting kit|Y
01|217925|1|1|Additional 20% overstock promotional discount applied.|Y
01|217925|1|2|These items cannot be cancelled or returned once PO is|Y
01|217925|1|3|received.|Y
01|217926|2|1|Promotional discount of 20% was added to the price|Y
01|217926|2|2|of the above holder. These are non returnable.|Y
01|217932|1|1|Part# C6-ASHR-122-25.4CP-IDI|Y
01|217932|1|2|PSC C6T 1x1 RT Squ. Shank Holder 180deg Mill-Turn|Y
01|217932|1|3|Installed with baluff chip# (Pending) provided by LN.|Y
01|217932|2|1|Part# C6-EM1250-90-IDI|Y
01|217932|2|2|PSC C6 End Mill Holder 1.1/4 ChipHole 25K|Y
01|217932|2|3|Installed with baluff chip# (Pending) provided by LN.|Y
01|217932|3|1|Part# C6-EM1000-80-IDI|Y
01|217932|3|2|PSC C6 End Mill Holder 1 ChipHole 25K|Y
01|217932|3|3|Installed with baluff chip# (Pending) provided by LN.|Y
01|217932|4|1|Part# C6-ER40-65-IDI|Y
01|217932|4|2|PSC C6 ER40ColletChuck HiTorque BearingNut ChipHole 25K|Y
01|217932|4|3|Installed with baluff chip# (Pending) provided by LN.|Y
01|217932|5|1|Part# C6-EM0625-65-IDI|Y
01|217932|5|2|PSC C6 End Mill Holder 5/8 ChipHole 25K|Y
01|217932|5|3|Installed with baluff chip# (Pending) provided by LN.|Y
01|217932|6|1|Part# C6-ER32-60-IDI|Y
01|217932|6|2|PSC C6 ER32ColletChuck HiTorque BearingNut ChipHole 25K|Y
01|217932|6|3|Installed with baluff chip# (Pending) provided by LN.|Y
01|217932|7|1|Part# C6-EM1500-90-IDI|Y
01|217932|7|2|PSC C6 End Mill Holder 1.1/2 ChipHole 25K 90mm GL|Y
01|217932|7|3|Installed with baluff chip# (Pending) provided by LN.|Y
01|217932|7|4|**Special Custom Tool**|Y
01|217932|8|1|Part# C6-EM1500-60-IDI|Y
01|217932|8|2|PSC C6 End Mill Holder 1.1/2 ChipHole 25K 60mm GL|Y
01|217932|8|3|Installed with baluff chip# (Pending) provided by LN.|Y
01|217932|8|4|**Special custom tool**|Y
01|217932|9|1|A tariff surcharge may be added to this quotation in|Y
01|217932|9|2|the event of a sustained tariff increase on the|Y
01|217932|9|3|importation of this product.  Any surcharge will be|Y
01|217932|9|4|disclosed prior to acceptance of an order.|Y
01|217934|1|1|ISO30 SK16 70mm GL|Y
01|217934|2|1|ISO30 C3/4 75mm|Y
01|217938|1|1|Part# C6-ASHR-122-25.4CP-IDI|Y
01|217938|1|2|PSC C6T 1x1 RT Squ. Shank Holder 180deg Mill-Turn|Y
01|217938|1|3|Installed w/ customer provided baluff chip# (Pending)|Y
01|217938|2|1|Part# C6-EM1250-90-IDI|Y
01|217938|2|2|PSC C6 End Mill Holder 1.1/4 ChipHole 25K|Y
01|217938|2|3|Installed w/ customer provided baluff chip# (Pending)|Y
01|217938|3|1|Part# C6-EM1000-80-IDI|Y
01|217938|3|2|PSC C6 End Mill Holder 1 ChipHole 25K|Y
01|217938|3|3|Installed w/ customer provided baluff chip# (Pending)|Y
01|217938|4|1|Part# C6-ER40-65-IDI|Y
01|217938|4|2|PSC C6 ER40ColletChuck HiTorque BearingNut ChipHole 25K|Y
01|217938|4|3|Installed w/ customer provided baluff chip# (Pending)|Y
01|217938|5|1|Part# C6-EM0625-65-IDI|Y
01|217938|5|2|PSC C6 End Mill Holder 5/8 ChipHole 25K|Y
01|217938|5|3|Installed w/ customer provided baluff chip# (Pending)|Y
01|217938|6|1|Part# C6-ER32-60-IDI|Y
01|217938|6|2|PSC C6 ER32ColletChuck HiTorque BearingNut ChipHole 25K|Y
01|217938|6|3|Installed w/ customer provided baluff chip# (Pending)|Y
01|217938|7|1|Part# C6-EM1500-90-IDI|Y
01|217938|7|2|PSC C6 End Mill Holder 1.1/2 ChipHole 25K 90mm GL|Y
01|217938|7|3|Installed w/ customer provided baluff chip# (Pending)|Y
01|217938|7|4|**Special Custom Tool**|Y
01|217938|8|1|Part# C6-EM1500-60-IDI|Y
01|217938|8|2|PSC C6 End Mill Holder 1.1/2 ChipHole 25K 60mm GL|Y
01|217938|8|3|Installed w/ customer provided baluff chip# (Pending)|Y
01|217938|8|4|**Special custom tool**|Y
01|217938|9|1|A tariff surcharge may be added to this quotation in|Y
01|217938|9|2|the event of a sustained tariff increase on the|Y
01|217938|9|3|importation of this product.  Any surcharge will be|Y
01|217938|9|4|disclosed prior to acceptance of an order.|Y
01|217941|1|1|Holdwell # AHB-CAT 50-ER40 ( 80/110)|Y
01|217941|3|1|Holdwell # AHC-CAT50-FA25.4 90 DEGREE HEAD|Y
01|217941|4|1|Holdwell # AHC-CAT50-FA25.4 90 DEGREE HEAD|Y
01|217941|5|1|Holdwell # AHC-CAT50-FA25.4 90 DEGREE HEAD|Y
01|217941|6|1|L-N# MI50-SM25.4|Y
01|217941|6|2|MI50 Shell Mill Holder 1 No Wrench|Y
01|217941|8|1|Holdwell # CAT50-ER32 UNIVERSAL HEAD|Y
01|217941|10|1|Quoted at NET Price.|Y
01|217946|1|1|**Net Price**|Y
01|217946|2|1|**Net Price**|Y
01|217952|1|1|Additional 5% IMTS Live/Static Tool Promotion Discount|Y
01|217952|1|2|applied.|Y
01|217952|2|1|PROMOTION-IMTS24LIVE - applied only to MNL12-ER32X-OFF|Y
01|217955|1|1|RGA#TOR-60937/|Y
01|217955|1|2|Repair of PF-2|Y
01|217955|3|1|Calibration service included.|Y
01|217968|1|1|Includes Power and Feedback Cables|Y
01|217984|7|1|PLEASE INSTALL COOLANT TUBES BEFORE SHIPPING|Y
01|217990|7|1|PLEASE INSTALL COOLANT TUBES BEFORE SHIPPING|Y
01|217991|1|1|Addtional 10% IMTS Live/Static Tool Promotion Discount|Y
01|217991|1|2|applied.|Y
01|217991|2|1|PROMOTION-IMTS24LIVE - applied only to OKE4-ER40Z-ICE|Y
01|217994|1|1|NCAT50; CAPTO C5 TWIN SPINDLE; EXTERNAL COOLANT|Y
01|217994|1|2|MAX 70 BAR; A=80mm; L1=109mm;2:1 GEAR MAX 180Nm|Y
01|217994|1|3|MAX IN 4000RPM; REF Conceptual Drawing #00061821|Y
01|217994|1|4|Quoted at NET price for 1 tool.|Y
01|217994|1|5|Lyndex-Nikken Part # NC5RAM-C5TS-109EC-80TP3P|Y
01|217994|3|1|NCAT50; CAPTO C5 TWIN SPINDLE; EXTERNAL COOLANT|Y
01|217994|3|2|MAX 70 BAR; A=80mm; L1=109mm;2:1 GEAR MAX 180Nm|Y
01|217994|3|3|MAX IN 4000RPM; REF Conceptual Drawing #00061821|Y
01|217994|3|4|Quoted at NET price for 2 tools.|Y
01|217994|3|5|Lyndex-Nikken Part # NC5RAM-C5TS-109EC-80TP3P|Y
01|217995|6|1|Additional overstock discount promo added to item.|Y
01|217995|6|2|Final sale.|Y
01|217997|7|1|CAT40-AF1-20-OH|Y
01|217997|7|2|Automatic Back spot Facing Arbor  CAT40 (TBD)|Y
01|218001|7|1|**PRICE PENDING**|Y
01|218001|7|2|Part# C6-EM1500-90|Y
01|218001|7|3|PSC C6 End Mill Holder 1.1/2 ChipHole 25K 90mm GL|Y
01|218001|7|4|**Special custom tool. Once a PO is placed cannot be|Y
01|218001|7|5|cancelled or returned**|Y
01|218001|8|1|**PRICE PENDING**|Y
01|218001|8|2|Part# C6-EM1500-60|Y
01|218001|8|3|PSC C6 End Mill Holder 1.1/2 ChipHole 25K 60mm GL|Y
01|218001|8|4|**Special custom tool. Once a PO is placed cannot be|Y
01|218001|8|5|cancelled or returned.|Y
01|218001|10|1|Installation of baluff chip# (pending) provided by LN.|Y
01|218001|11|1|Installation of baluff chip# (Pending) provided by|Y
01|218001|11|2|customer.|Y
01|218003|1|1|For CNCZ321MA SN:5821  RGA#TAR-60955|Y
01|218003|1|2|Full rebuild of the table include labor all basic|Y
01|218003|1|3|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|218012|7|1|**PRICE PENDING**|Y
01|218012|7|2|Part# C6-EM1500-90|Y
01|218012|7|3|PSC C6 End Mill Holder 1.1/2 ChipHole 25K 90mm GL|Y
01|218012|7|4|**Special custom tool. Once a PO is placed cannot be|Y
01|218012|7|5|cancelled or returned**|Y
01|218012|8|1|**PRICE PENDING**|Y
01|218012|8|2|Part# C6-EM1500-60|Y
01|218012|8|3|PSC C6 End Mill Holder 1.1/2 ChipHole 25K 60mm GL|Y
01|218012|8|4|**Special custom tool. Once a PO is placed cannot be|Y
01|218012|8|5|cancelled or returned.|Y
01|218012|10|1|Installation of baluff chip# (pending) provided by LN.|Y
01|218012|11|1|Installation of baluff chip# (Pending) provided by|Y
01|218012|11|2|customer.|Y
01|218015|1|1|1pc OVERSTOCK|Y
01|218015|1|2|Please note Overstock promotion of 20% has been|Y
01|218015|1|3|applied to the discounted quote. Item is Final Sale.|Y
01|218015|4|1|Quoted at NET pricing|Y
01|218015|6|1|Quoted at NET pricing|Y
01|218021|1|1|This item is considered special once ordered it cannot|Y
01|218021|1|2|be cancelled or returned. Net price has been quote.|Y
01|218038|1|1|formerly part# C40S6-0250-1.38|Y
01|218038|2|1|once stock is depleted part# is C4006-0375-1.38|Y
01|218038|3|1|formerly part# C40S6-0500-1.75|Y
01|218038|4|1|formerly part# C40S6-0625-1.75|Y
01|218038|5|1|formerly part# C40S6-0750-1.75|Y
01|218038|6|1|formerly part# C40S6-1000-2.00|Y
01|218046|1|1|POWER/FEEDBACK CABLE SET|Y
01|218046|1|2|CNC260YA-RMC - PER HURCO WIRING DIAGRAM #HRO|Y
01|218046|1|3|ONLY USING X2 WIRE HOME SWITCH PROX|Y
01|218046|1|4|SIGMA V - 09 MOTOR|Y
01|218056|1|1|This item is considered a special/non-standard stock|Y
01|218056|1|2|item.  Once a PO has been received it cannot be|Y
01|218056|1|3|cancelled or returned.|Y
01|218060|4|1|This modification charge includes the following:|Y
01|218060|4|2|Chip hole Baluff chip Istallation Rebalance|Y
01|218065|1|1|For CNC250FA-H SN:TBD RGA#TAB-60963|Y
01|218065|1|2|Full rebuild of the table include labor all basic|Y
01|218065|1|3|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|218074|6|1|Promotional discount of 20% has been added to the|Y
01|218074|6|2|discount.|Y
01|218082|5|1|Please note B3507-0016B is on our Overstock list. I|Y
01|218082|5|2|have applied an extra 20% to the discount and this|Y
01|218082|5|3|holder is non-returnable.|Y
01|218084|1|1|Item is non-standard stock/specialonce a PO has been|Y
01|218084|1|2|received it can not be cancelled or returned.|Y
01|218084|1|3|Quoted at NET pricing|Y
01|218089|13|1|Full beruild of CNC260MA SN:3750|Y
01|218089|13|2|Include labor all basic components (Bearings/Seals/|Y
01|218089|13|3|O-Rings)worm wheel & worm screw.|Y
01|218089|18|1|Brand New Table with core traid in|Y
01|218089|18|2|Custome to supply motor & cables|Y
01|218095|1|1|Modular AngleHead Taper HSK63F w/o Positioning Arm|Y
01|218095|1|2|Quantity Break: 2pcs NET:2868.83/EA|N
01|218095|1|3|Quantity Break: 3pcs NET:2256.41/EA|N
01|218095|1|4|Delivery: Please allow 4 weeks for design time from|Y
01|218095|1|5|receipt of PO. Once approval drawing signed expect|Y
01|218095|1|6|7-8 weeks for manufacturing and shipping.|Y
01|218095|1|7|These are custom angle heads for specific applications.|Y
01|218095|1|8|Once a PO has been placed these units cannot be|Y
01|218095|1|9|cancelled or returned.|Y
01|218095|3|1|HSK63F Taper Positioning Block|Y
01|218095|3|2|LN to make positioning block upon receipt of spindle|Y
01|218095|3|3|drawing information. *NET price|Y
01|218095|4|1|CAT40 Positioning block|Y
01|218095|4|2|LN to make positioning block upon receipt of spindle|Y
01|218095|4|3|drawing information. *NET price|Y
01|218095|11|1|A tariff surcharge of 8% will be added to every order|Y
01|218095|11|2|placed after September 1st 2025(until further notice).|Y
01|218095|11|3|This surcharge will be acknowledged upon acceptance|Y
01|218095|11|4|of every order.|Y
01|218096|1|1|Additional 20% Overstock Promo discount applied. This|Y
01|218096|1|2|item cannot be cancelled or returned upon receipt of PO|Y
01|218096|2|1|Overstock Promotion - applied only to C4017-0100-6.00|Y
01|218099|5|1|$1500 tooling credit with purchase of FI-6|Y
01|218106|1|1|Cheersun BOAT #06202401: No INS Req'd.|Y
01|218106|2|1|Cheersun BOAT #06202401: No INS Req'd.|Y
01|218106|3|1|Cheersun BOAT #06202401: No INS Req'd.|Y
01|218106|4|1|Cheersun BOAT #06202401: No INS Req'd.|Y
01|218106|5|1|Cheersun BOAT #06202401: No INS Req'd.|Y
01|218106|6|1|Cheersun BOAT #06202401: No INS Req'd.|Y
01|218106|7|1|Cheersun BOAT #06202401: No INS Req'd.|Y
01|218106|8|1|Cheersun BOAT #06202401: No INS Req'd.|Y
01|218109|1|1|Part# NC5006-32-4.00CP   **QUOTED AT NET PRICE**|Y
01|218109|1|2|NCAT50 DualContact End Mill Holder 32mm ChipHole 25K|Y
01|218109|1|3|Please note: This is special non-standard stock. Once|Y
01|218109|1|4|a PO is placed this item cannot be cancelled or|Y
01|218109|1|5|returned.|Y
01|218110|1|1|FM10|Y
01|218116|1|1|H10ARAM-C5-375ICE-118TP3|Y
01|218116|1|2|HSK100A AGH; CAPTO C5; 3PINS SUPPORT;A=118mm;|Y
01|218116|1|3|INT/ EXT COOLANT ICE; ELTIMON EQUIPPED;1:1 GEAR|Y
01|218116|1|4|MAX 150Nm; 5000 RPM;|Y
01|218116|1|5|SPECIAL One time NET price for 1 angle head.|Y
01|218116|2|1|H10ARAM-C5-375ICE-118TP3|Y
01|218116|2|2|HSK100A AGH; CAPTO C5; 3PINS SUPPORT;A=118mm;|Y
01|218116|2|3|INT/ EXT COOLANT ICE; ELTIMON EQUIPPED;1:1 GEAR|Y
01|218116|2|4|MAX 150Nm; 5000 RPM;|Y
01|218116|2|5|Net price based upon receipt of two Angle Heads.|Y
01|218116|3|1|H10ARAM-C5-375ICE-118TP3|Y
01|218116|3|2|HSK100A AGH; CAPTO C5; 3PINS SUPPORT;A=118mm;|Y
01|218116|3|3|INT/ EXT COOLANT ICE; ELTIMON EQUIPPED;1:1 GEAR|Y
01|218116|3|4|MAX 150Nm; 5000 RPM;|Y
01|218116|3|5|Net price based upon receipt of Four Angle Heads.|Y
01|218121|1|1|A191459 - AGW-MA-C-50-ER40-1 (per print)|Y
01|218127|4|1|PREVENTATIVE MAINTENANCE SERVICE|Y
01|218127|4|2|INCLUDES:|Y
01|218141|10|1|FOR .165 DRILL|Y
01|218141|11|1|FOR M5 X 0.8 TAP W/ .1940 SHANK|Y
01|218163|1|1|Please note I've applied an extra 5% discount to this|Y
01|218163|1|2|for our IMTS early bird promotion!|Y
01|218164|1|1|RGA#LVR-60942/|Y
01|218164|1|2|Repair of BMT65-ER32X s/n: 77121 57 (Mimatic#186489)|Y
01|218164|2|1|Bearings seals and o-rings to be replaced.|Y
01|218168|1|1|To be installed w/ PS-N63AE @ Factory|Y
01|218168|1|2|1 pc: 2 Weeks - Balance: 4-5 Weeks|Y
01|218168|2|1|To be installed w/ NC5-63-SK25C-135 @ Factory|Y
01|218168|2|2|1 pc: 2 Weeks - Balance: 4-5 Weeks|Y
01|218168|3|1|To be installed w/ PS-N63AE @ Factory|Y
01|218168|4|1|To be installed w/ NC5-63-SK16C-150 @ Factory|Y
01|218168|5|1|To be installed w/ PS-N63AE @ Factory|Y
01|218168|6|1|To be installed w/ NC5-63-FMA25.4-45 @ Factory|Y
01|218168|7|1|To be installed w/ PS-N63AE @ Factory|Y
01|218168|8|1|To be installed w/ NC5-63-C20-70 @ Factory|Y
01|218168|9|1|To be installed w/ PS-N63AE @ Factory|Y
01|218168|10|1|To be installed w/ NC5-63-SK16C-105 @ Factory|Y
01|218168|11|1|To be installed w/ PS-N63AE @ Factory|Y
01|218168|12|1|To be installed w/ NC5-63-C20-120 @ Factory|Y
01|218168|15|1|To be installed w/ PS-N63AE @ Factory|Y
01|218168|16|1|To be installed w/ NC5-46-C32-100 @ Factory|Y
01|218168|17|1|To be installed w/ PS-N63AE @ Factory|Y
01|218168|18|1|To be installed w/ NC5-46-C20-80G @ Factory|Y
01|218168|19|1|To be installed w/ PS-N63AE @ Factory|Y
01|218168|20|1|To be installed w/ NC5-46-C20-120P @ Factory|Y
01|218168|21|1|To be installed w/ PS-N63AE @ Factory|Y
01|218168|22|1|To be installed w/ PS-N63AE @ Factory|Y
01|218169|2|1|Quoted at NET price.|Y
01|218173|6|1|A tariff surcharge may be added to this quotation in|Y
01|218173|6|2|the event of a sustained tariff increase on the|Y
01|218173|6|3|importation of this product.  Any surcharge will be|Y
01|218173|6|4|disclosed prior to acceptance of an order.|Y
01|218175|1|1|BT50 AngleHead; Adjustable (0-98Deg); ER25; Int Coolant|Y
01|218175|1|2|Thru Spindle 70BAR; A=80 L=195mm L1=100mm|Y
01|218175|1|3|1:2.25 Gear Max M=30Nm;|Y
01|218175|1|4|Max In 6000RPM; Max Out 13500RPM|Y
01|218175|1|5|Qty 2 Lead Time: Same as 1 pc - 5-6 Weeks ARO|Y
01|218175|1|6|landed price = 7821.40usd|N
01|218175|2|1|LN to make positioning block upon receipt of spindle|Y
01|218175|2|2|drawing. Please allow 1 week after spindle drawing|Y
01|218176|20|1|For NCAT40-C1.1/4-120U-IDU & NCAT40-C32-105U-IDU|Y
01|218176|21|1|For NCAT40-C1-105U-IDU|Y
01|218176|22|1|For NCAT40-SK10C-90U-IDU|Y
01|218176|23|1|For NCAT40-SK16C-90U-IDU|Y
01|218176|27|1|L-N provides ID Tips and Install ID Chips|Y
01|218176|27|2|MOQ: 10-20 (NET $215/EA)|Y
01|218176|28|1|MODIFICATION-CHIP-HOLE-INSTALL|Y
01|218176|28|2|Cost to make hole for ID Tip in Tool holder and Install|Y
01|218176|28|3|ID Tip. Including the ID Tip cost|Y
01|218176|28|4|MOQ: 5-9 (NET $290/EA)|Y
01|218184|1|1|BT40-MOC20-145|Y
01|218184|2|1|BT40-MOC32-170|Y
01|218184|3|1|BT50-MOC20-160|Y
01|218184|4|1|BT50-MOC32-170|Y
01|218186|1|1|HSK80A MANUAL SPINDLE FOR A LARTH|Y
01|218186|3|1|HSK50E MANUAL SPINDLE FOR A LARTH|Y
01|218212|3|1|SCALE FOR TILT AXIS|Y
01|218212|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|218212|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|218212|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|218212|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|218212|7|1|CUSTOM ADAPTER PLATE FOR 5AX-201 FOR GE FIXTURE|Y
01|218212|7|2|** WILL NEED TO DISCUSS SOME FEATURES ON DRAWING ONCE|Y
01|218212|7|3|PO IS ISSUED ***|Y
01|218231|1|1|1st Batch|Y
01|218245|1|1|The List Price for this Table is $24465.00|Y
01|218247|1|1|Standard Base|Y
01|218247|5|1|Premium Base|Y
01|218250|5|1|HSK63A-MMC12C-135-AT|Y
01|218250|6|1|HSK63A-MMC12C-147-AA|Y
01|218250|7|1|HSK63A-MMC8C-135-AT-RP|Y
01|218250|8|1|HSK63A-MMC8C-145-AA|Y
01|218250|9|1|HSK63A-MMC8C-175-AA|Y
01|218251|16|1|Overstock Promotion - Additional 20% discount has been|Y
01|218251|16|2|applied to above items Lines 1-15. These items cannot|Y
01|218251|16|3|be cancelled or returned upon receipt of PO.|Y
01|218253|2|1|Additional 20% overstock promo discount added|Y
01|218258|2|1|Quoted at Net price|Y
01|218260|1|1|Full rebuild of the table include labor all basic|Y
01|218260|1|2|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|218260|1|3|Rebuild of CNC201 SN:8285|Y
01|218261|2|1|***|Y
01|218261|3|1|S32-C12-200|Y
01|218261|3|2|***|Y
01|218261|4|1|HSK63A-C25-130|Y
01|218261|4|2|***|Y
01|218261|5|1|***|Y
01|218261|7|1|***|Y
01|218280|1|1|Comes w/ two Shrink Fit Pots (SF-POT-xx)|Y
01|218280|2|1|$1000 tooling credit with purchase of START.2|Y
01|218283|1|1|Additional 20% Overstock Promo Discount applied.|Y
01|218283|1|2|This item cannot be cancelled or returned upon receipt|Y
01|218283|1|3|of PO.|Y
01|218283|2|1|Overstock promotion valid only for C40SF-0750-5.12B|Y
01|218288|15|1|Net pricing.|Y
01|218288|15|2|Special Promo: 9$ retention knob per holder|Y
01|218294|7|1|Installation of above rotary table|Y
01|218294|7|2|BUT Allendale Machinery will provide 4th Axis Drive|Y
01|218294|7|3|Lyndex will install RT with Cables/Cable Management|Y
01|218294|7|4|and Interface|Y
01|218297|1|1|Additional 20% Overstock Promo Discount applied.|Y
01|218297|1|2|This item cannot be cancelled or returned upon receipt|Y
01|218297|1|3|of PO.|Y
01|218311|1|1|IT40-FMA-25.4-45|Y
01|218311|2|1|IT40-FMA-25.4-90|Y
01|218317|1|1|EXTRA DISCOUNT IS BEING EXTENDED FOR A DEMO UNIT.|Y
01|218317|1|2|UNIT IS SUBJECT TO PRIOR SALE.|Y
01|218317|1|3|WARRANTY IS 1 YEAR AGAINST MANUFACTURER'S DEFECT.|Y
01|218327|1|1|For CNC260FA SN:11437C|Y
01|218327|2|1|Adapter plate 10|Y
01|218328|4|1|Quoted at NET price.|Y
01|218330|1|1|Overstock promo discount of 20% added. Final Sale.|Y
01|218330|2|1|Overstock promo discount of 20% added. Final Sale.|Y
01|218331|2|1|Ser# 17018049022US|Y
01|218331|3|1|NCAT40 KIT WITH NERP BOM|Y
01|218347|1|1|RGA#LVR-60951/|Y
01|218347|1|2|Repair of MZMP46-ER32Z-ICE s/n:74676 16|Y
01|218347|1|3|(Mimatic#124854)|Y
01|218347|2|1|Bearings seals and o-rings to be replaced. Tool was|Y
01|218347|2|2|crashed. Needs new housing|Y
01|218354|4|1|H63A-SF4-160MT|Y
01|218355|1|1|Alternative for B35-4500|Y
01|218360|5|1|wrench #1 for MI40-ER25I attachment|Y
01|218360|6|1|wrench #2 for MI40-ER25I attachment|Y
01|218360|8|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|218360|8|2|of spindle drawing confirmation|Y
01|218360|8|3|*NET price|Y
01|218365|3|1|MI63-SM40|Y
01|218365|3|2|Quick Change Attachment MI63 Shell Mill Holder 40mm|Y
01|218365|3|3|No Wrench|Y
01|218365|4|1|Net Price. Discount is not applied.|Y
01|218369|1|1|HSK63A-Z16-130|Y
01|218387|5|1|Lyndex-Nikken to design and manufacture positioning|Y
01|218387|5|2|block. ETA: 1 week upon receipt of spindle drawing.|Y
01|218389|1|1|These are considered special and cannot be cancelled|Y
01|218389|1|2|or returned. *Quoted at NET Price*|Y
01|218398|1|1|OKUMA LIVE; BMT60; S1=76mm; ER25 FIXED ANGLE 87DEG|Y
01|218398|1|2|(In 90 Deg head)L1=APPROX. 115mm;EXT COOLANT|Y
01|218398|1|3|1:2 GEAR MAX 25Nm; MAX IN 3000RPM; MAX OUT 6000RPM|Y
01|218398|1|4|Quoted at NET price.|Y
01|218398|3|1|Quote at NET price minimum 2 tools.|Y
01|218398|5|1|Quote at NET price minimum 3 tools.|Y
01|218398|7|1|Quote at NET price minimum 4 tools.|Y
01|218398|9|1|Quote at NET price minimum 5 tools.|Y
01|218398|11|1|Wrench-Mim-112913|Y
01|218403|1|1|Part# TBD|Y
01|218403|1|2|**QUOTED AT NET PRICE**|Y
01|218403|1|3|CAT40 FLEX HEAD; ER20; NO COOLANT; L=189mm; L1=91mm;|Y
01|218403|1|4|1:1 GEAR MAX 15Nm; MAX 8000 RPM; REF DRWG#00046345|Y
01|218403|1|5|[CONNECTION w/ ALUMINUM PLATE] APPRX WEIGHT 7.55 Kg|Y
01|218403|11|1|Lyndex-Nikken to design and mfg positioning block.|Y
01|218403|11|2|ETA: ~1 Week upon receipt of spindle drawing.|Y
01|218408|1|1|Additional 20% overstock promotion discounta applied.|Y
01|218408|1|2|This item cannot be cancelled or returned after receipt|Y
01|218408|1|3|of PO.|Y
01|218408|2|1|Overstock Promotion applied to MCAT40-MMC8-90U.|Y
01|218411|3|1|Mazak VDI40 Live PSC C4 X<Radial>STRT Offset|Y
01|218411|3|2|External Coolant >> Mimatic #TBD/L-N# MZMP47-C4X-Off|Y
01|218428|1|1|RGA#CUR-60952/|Y
01|218428|1|2|Repair of CAT50U-AHT35-210-90 s/n:AKK-08863|Y
01|218429|2|1|Please check with customer to see if they need|Y
01|218429|2|2|to have the draw screw threaded.|Y
01|218432|8|1|Next AIR Cut 8/2 for ETA to L-n mid August.|Y
01|218432|10|1|Next AIR Cut 8/2 for ETA to L-n mid August.|Y
01|218434|1|1|$1000 Shrink Fit Tooling with purchase of a START2|Y
01|218439|1|1|HSK63A-Z16-130|Y
01|218440|1|1|RGA#LVR-60964/|Y
01|218440|1|2|Repair of 173012 s/n:79546 05 (Mimatic#173012)|Y
01|218440|2|1|Bearings seals and o-rings to be replaced.|Y
01|218450|1|1|Delivery is 12 weeks after approval drawing is signed|Y
01|218452|1|1|To be installed w/ PS-N63AE @ Factory|Y
01|218452|2|1|To be installed w/ NC5-63-SK25C-135 @ Factory|Y
01|218463|1|1|Additional 5% IMTS Early Bird Promo discount applied.|Y
01|218463|2|1|IMTS Early Bird Promotion - applied to BT40-MMC8C-90-AA|Y
01|218466|6|1|MC: DMG MORI CMX1100V|Y
01|218473|2|1|Special/Non-standard stock can not be cancelled or|Y
01|218473|2|2|returned once a PO has been received.|Y
01|218473|2|3|Quoted at NET pricing|Y
01|218473|4|1|Special/Non-standard stock can not be cancelled or|Y
01|218473|4|2|returned once a PO has been received.|Y
01|218473|4|3|Quoted at NET pricing|Y
01|218473|5|1|Special/Non-standard stock can not be cancelled or|Y
01|218473|5|2|returned once a PO has been received.|Y
01|218473|5|3|Quoted at NET pricing|Y
01|218477|1|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|218477|2|1|IMTS Early Bird Promotion - applied only to|Y
01|218477|2|2|MZQT47-ER32Z-MS|Y
01|218478|2|1|Installation includes: Bulkhead cables external cables|Y
01|218478|2|2|parameter changes service time and travel.|Y
01|218478|2|3|L/N will utilize the DDR drive unit in the machine.|Y
01|218478|4|1|1.5 riser to swing|Y
01|218481|1|1|RGA#LVR-60689/|Y
01|218481|1|2|Repair of T32332 s/n:A0163 (Alps#T32332)|Y
01|218481|2|1|Bearings o-rings spindle and nut to be replaced.|Y
01|218481|4|1|RGA#LVR-60689/|Y
01|218481|4|2|Repair of T32332 s/n: A0169 (Alps#T32332)|Y
01|218481|5|1|Bearings o-rings spindle and nut to be replaced.|Y
01|218489|4|1|H63A-SF4-160MT|Y
01|218492|6|1|POSITIONING BLOCK FOR DOOSAN NHP5500|Y
01|218493|1|1|Conversion: CNC401|Y
01|218493|1|2|Serial 10339 from Mazak VTC200B with Mazatrol 640M|Y
01|218493|1|3|to Okuma Genos M560 Serial Number 256130 with OSP300|Y
01|218493|1|4|This quote doe not include any repairs for the table|Y
01|218493|1|5|Lyndex Nikken will contact Morris South if there are|Y
01|218493|1|6|any repairs required.|Y
01|218493|1|7|Delivery/Turn Around Time: Ships out 1 week after we|Y
01|218493|1|8|receive the table.|Y
01|218495|1|1|H80F-SF0250-6.00B|Y
01|218495|1|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 20K|Y
01|218495|1|3|Pricing reflects a minimum of 2~4 holders.|Y
01|218495|3|1|H80F-SF0250-6.00B|Y
01|218495|3|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 20K|Y
01|218495|3|3|Pricing reflects a minimum of 5~9 holders.|Y
01|218495|5|1|H80F-SF0250-6.00B|Y
01|218495|5|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 20K|Y
01|218495|5|3|Pricing reflects a minimum of 10+ holders.|Y
01|218496|1|1|Includes Haas motor and cable set.|Y
01|218496|1|2|Machine must have 3rd party software option.|Y
01|218502|1|1|1st Batch|Y
01|218502|2|1|1st Batch|Y
01|218511|6|1|T00135|Y
01|218511|6|2|The above item is a special once and order is placed|Y
01|218511|6|3|it can not be cancelled or returned|Y
01|218512|1|1|EXTRA DISCOUNT IS BEING EXTENDED FOR A DEMO UNIT.|Y
01|218512|1|2|UNIT IS SUBJECT TO PRIOR SALE.|Y
01|218512|1|3|WARRANTY IS 1 YEAR AGAINST MANUFACTURER'S DEFECT.|Y
01|218513|1|1|EXTRA DISCOUNT IS BEING EXTENDED FOR A DEMO UNIT.|Y
01|218513|1|2|UNIT IS SUBJECT TO PRIOR SALE.|Y
01|218513|1|3|WARRANTY IS 1 YEAR AGAINST MANUFACTURER'S DEFECT.|Y
01|218516|3|1|PVC WRAPPED EXTERNAL POWER AND FEEDBACK CABLES|Y
01|218516|3|2|FOR 4TH AND 5TH AXES MADE TO LENGTH FOR OKUMA|Y
01|218516|3|3|GENOS M560V|Y
01|218519|1|1|BT50-2TG6S-200|Y
01|218519|2|1|BT50-2TG10S-200|Y
01|218530|1|1|H80F-SF0250-6.00B|Y
01|218530|1|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 20K|Y
01|218530|1|3|Pricing reflects a minimum of 2~4 holders.|Y
01|218530|3|1|H80F-SF0250-6.00B|Y
01|218530|3|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 20K|Y
01|218530|3|3|Pricing reflects a minimum of 5~9 holders.|Y
01|218530|5|1|H80F-SF0250-6.00B|Y
01|218530|5|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 20K|Y
01|218530|5|3|Pricing reflects a minimum of 10+ holders.|Y
01|218534|1|1|Cert face value is $15000.00 -|Y
01|218534|1|2|Items redeemed are at List Price|Y
01|218548|2|1|Boring ring required item quoted below.|Y
01|218561|1|1|Promo discount|Y
01|218561|2|1|Promo discount|Y
01|218568|1|1|RGA#LVR-60941/|Y
01|218568|1|2|Repair of MNL12-ER32Z-MS-10K s/n:A0033|Y
01|218568|1|3|(Alps#MSA01-3W000)|Y
01|218568|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|218568|2|2|replaced.|Y
01|218568|4|1|RGA#LVR-60941/|Y
01|218568|4|2|Repair of MNL12-ER32Z s/n:A3926 (Alps#T32207)|Y
01|218568|5|1|Bearings o-rings collet nut and spindle to be|Y
01|218568|5|2|replaced.|Y
01|218575|1|1|Delivery 1pc 1 week & balance 6 weeks|Y
01|218576|1|1|RGA#LVR-60977/|Y
01|218576|1|2|Repair of OKU-L370MW-DB s/n: AL163 (Alps#OK109-15001)|Y
01|218576|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|218576|2|2|repalced.|Y
01|218587|1|1|NMTB50 taper holder 3/4 diameter with specs included|Y
01|218587|1|2|for P/N: GTP330-C-29.|Y
01|218589|4|1|PREVENTATIVE MAINTENANCE SERVICE ($3200 PER TOOL)|Y
01|218589|4|2|INCLUDES FULL INSPECTION OF ANGLE HEAD FOR ACCURACY|Y
01|218589|4|3|AND RUNOUT; ALSO INCLUDES REPLACEMENT OF ALL WEAR|Y
01|218589|4|4|PARTS (BEARINGS/SEALS/O-RINGS); HYDRAULIC FLUIDS|Y
01|218589|4|5|WILL ALSO BE REPLACED AND REFILLED|Y
01|218589|4|7|PM SERVICE SHOULD BE PERFORMED AFTER 500 HOURS OF|Y
01|218589|4|8|RUN TIME IN A MACHINING APPLICATION (IN THE CUT)|Y
01|218592|1|1|Req.INS/T/P Inspection Required|Y
01|218593|2|1|IMTS promotional 5% has been added to the discount.|Y
01|218593|7|1|Overstock >> Non-returnable.|Y
01|218593|8|1|Overstock >> Non-returnable.|Y
01|218607|12|1|5% additional promo discount|Y
01|218607|12|2|added to SK collet chucks|Y
01|218612|1|1|***Extra 10% discount added for IMTS Holder Promo***|Y
01|218612|8|1|***Extra 10% discount added for IMTS Holder Promo***|Y
01|218612|9|1|***Extra 10% discount added for IMTS Holder Promo***|Y
01|218612|10|1|***Extra 10% discount added for IMTS Holder Promo***|Y
01|218612|11|1|***Extra 10% discount added for IMTS Holder Promo***|Y
01|218612|12|1|***Extra 10% discount added for IMTS Holder Promo***|Y
01|218612|13|1|***Extra 10% discount added for IMTS Holder Promo***|Y
01|218612|14|1|***Extra 10% discount added for IMTS Holder Promo***|Y
01|218615|1|1|Additional 5% IMTS Early Bird Promo discount applied.|Y
01|218615|2|1|IMTS Early Bird Promo applied only to HSK100A-C1.1/4-|Y
01|218615|2|2|115-IDU|Y
01|218619|1|1|MD200 C4 90DEGREE REF: MU55-SK16Z-125-ICE|Y
01|218619|2|1|MD200 C4 90DEGREE REF: MU55-SK16Z-125-ICE|Y
01|218619|3|1|MD200 C4 90DEGREE REF: MU55-SK16Z-125-ICE|Y
01|218635|5|1|Promotional Live Tool Promo discount added|Y
01|218653|1|1|MZMP47-C4X-OFF-ICE-EL >> Mimatic # 204811|Y
01|218653|1|2|Mazak VDI40 Live PSC C4 X<Radial>STRT Offset|Y
01|218653|1|3|IntExtCool7MP 8.5K|Y
01|218653|1|4|EQUIPPED WITH MIMATIC e I t i m o n|Y
01|218653|1|5|Industry 4.0 e I ti m o n included Recording Of:|Y
01|218653|1|6|operating hours  rotational speed and temperature.|Y
01|218653|1|7|Quoted at NET price.|Y
01|218653|3|1|MZMP47-C4Z-ICE-EL Mimatic # 204812|Y
01|218653|3|2|Mazak VDI40 Live PSC C4 Z<Axial>90D|Y
01|218653|3|3|IntExtCool7MP 8.5K CH130|Y
01|218653|3|4|EQUIPPED WITH MIMATIC e I t i m o n|Y
01|218653|3|5|(electronic live tool integrated monitoring)|Y
01|218653|3|6|Industry 4.0 e I ti m o n includedRecording of:|Y
01|218653|3|7|operating hoursrotational speed and temperature|Y
01|218653|3|8|Quoted at NET price.|Y
01|218653|15|1|Mimatic #173610|Y
01|218653|16|1|Mimatic #169828|Y
01|218654|1|1|Drill and Tap Chuck as the DWG provided.|Y
01|218654|1|2|Special item once invoiced can not be returned.|Y
01|218655|1|1|C8-EM1500-4.50|Y
01|218655|2|1|C8-EM1500-3.00|Y
01|218655|3|1|C8-EM2000-3.00|Y
01|218655|4|1|C8-EM2000-4.50|Y
01|218655|5|1|C8-EM2000-5.00|Y
01|218655|6|1|C8-EM40-3.00|Y
01|218655|7|1|Delivery is after approval drawing is signed & recv'd|Y
01|218674|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|218674|3|2|MADE TO APPROPRIATE LENGTH FOR OKUMA M560V VMC|Y
01|218678|1|1|MIMATIC PART NUMBER: 195810|Y
01|218678|1|2|BMT45 ER16 ADJUSTABLE ANGLE LIVE TOOL|Y
01|218678|1|3|QUOTED AT NET PRICING|Y
01|218682|5|1|IF TRUNNION BASEPLATE IS NOT PURCHASED L-N SERVICE|Y
01|218682|5|2|WILL NOT INDICATE IN THE TRUNNION BODY.|Y
01|218682|5|3|WE HIGHLY RECOMMEND PURCHASING THE BASE PLATE.|Y
01|218684|2|1|Additional 20% overstock promotion discount applied.|Y
01|218684|2|2|Once a PO is placed this item cannot be cancelled or|Y
01|218684|2|3|returned.|Y
01|218687|2|1|Special Price.|Y
01|218703|1|1|Quoted at NET pricing. Non-returnable Non-cancelable|Y
01|218706|2|1|Approximate cost to have original motor rebuilt|Y
01|218706|2|2|Sanyo Model # Q2AA080500XP3S|Y
01|218706|2|3|Customer will send to USA to have rebuilt by L/N|Y
01|218726|28|1|A tariff surcharge of 8% will be added to every order|Y
01|218726|28|2|placed after September 1st 2025(until further notice).|Y
01|218726|28|3|This surcharge will be acknowledged upon acceptance|Y
01|218726|28|4|of every order.|Y
01|218739|1|1|PLEASE NOTE: 30% QUANTITY DISCOUNT (10-29 PIECES) IS|Y
01|218739|1|2|BASED ON A COMPLETE ORDER.  OTHERWISE 25% DISCOUNT|Y
01|218739|1|3|WOULD APPLY FOR 1-9 PIECES.|Y
01|218757|1|1|Soft Jaws for H034M8 A6-J|Y
01|218757|2|1|Jaw Nut(T-nut) for H034M8 A6-J|Y
01|218759|12|1|Promotion 5% discount added to the SK Toolholders.|Y
01|218761|4|1|Promotion of 5% has been added to the discount.|Y
01|218765|2|1|Special/Non-standard stock can not be cancelled or|Y
01|218765|2|2|returned once a PO has been received.|Y
01|218765|2|3|Quoted at NET pricing|Y
01|218765|4|1|Special/Non-standard stock can not be cancelled or|Y
01|218765|4|2|returned once a PO has been received.|Y
01|218765|4|3|Quoted at NET pricing|Y
01|218765|5|1|Special/Non-standard stock can not be cancelled or|Y
01|218765|5|2|returned once a PO has been received.|Y
01|218765|5|3|Quoted at NET pricing|Y
01|218766|2|1|Special/Non-standard stock can not be cancelled or|Y
01|218766|2|2|returned once a PO has been received.|Y
01|218766|2|3|Quoted at NET pricing|Y
01|218766|4|1|Special/Non-standard stock can not be cancelled or|Y
01|218766|4|2|returned once a PO has been received.|Y
01|218766|4|3|Quoted at NET pricing|Y
01|218766|5|1|Special/Non-standard stock can not be cancelled or|Y
01|218766|5|2|returned once a PO has been received.|Y
01|218766|5|3|Quoted at NET pricing|Y
01|218774|1|1|Quoted at net pricing|Y
01|218774|4|1|Quoted at net pricing|Y
01|218782|2|1|5AX-201YA-M SN:6980|Y
01|218785|1|1|LCH32-SZF10S-52-A|Y
01|218785|1|2|Straight Shank Extension 32mm Slim Chuck Bulls Eye|Y
01|218785|1|3|ZeroZero SK10|Y
01|218785|2|1|SKL-10S-P|Y
01|218785|2|2|Pin Face Wrench SK10 ZeroZero Holders|Y
01|218786|1|1|Quoted at NET price|Y
01|218786|2|1|Quoted at NET pricing|Y
01|218796|4|1|Verify Length of Cables for install.|Y
01|218796|5|1|Verify Length of Cables for install.|Y
01|218796|6|1|CUSTOM 14M CABLE|Y
01|218796|7|1|CUSTOM 14M CABLE|Y
01|218799|2|1|Quoted at NET price.|Y
01|218805|1|1|Additional 5% IMTS Early Bird Promo discount applied.|Y
01|218805|2|1|IMTS Early Bird Promotion applied to MZQT47-OD10X-MS|Y
01|218809|1|1|Additional 5% IMTS Early Bird Toolholder Promo discount|Y
01|218809|1|2|applied.|Y
01|218809|2|1|IMTS Early Bird Promo applied to C6-SF6-80CP only|Y
01|218811|1|1|Quoted at NET pricing|Y
01|218813|1|1|Includes cable sets.|Y
01|218817|5|1|Addtional 10% discount added for promo of over $5000|Y
01|218817|5|2|list based on quanitity.|Y
01|218824|1|1|Quoted at NET|Y
01|218828|1|1|Please Note: I added the extra promotion 5% to the|Y
01|218828|1|2|discount.|Y
01|218834|1|1|List Price $88410.00|Y
01|218834|2|1|List Price: $7642.00|Y
01|218834|3|1|List Price: $15300.00|Y
01|218834|4|1|Net Price|Y
01|218838|1|1|Part Number to be determined >>OKE4-C4X-ICE|Y
01|218838|1|2|Okuma BMT60 Live PSC C4 X<Radial>STRT IntExtCool7MP|Y
01|218838|1|3|Net Price quoted for 1~4 tools.|Y
01|218838|2|1|Part Number to be determined >>OKE4-C4Z-ICE|Y
01|218838|2|2|Okuma BMT60 Live PSC C4 Z<Axial>90D IntExtCool7MP|Y
01|218845|3|1|25 in stock 20 expected within 1-2 weeks and the|Y
01|218845|3|2|ETA of remaining 5pcs is still unknown.|Y
01|218850|2|1|Additional 20% overstock promotional discount|Y
01|218850|2|2|applied.  One a PO is placed this item cannot be|Y
01|218850|2|3|cancelled or returned.|Y
01|218852|1|1|Please Note: Promo of extra 5% has been added to the|Y
01|218852|1|2|discount.|Y
01|218854|1|1|These are non-standard stock items and considered|Y
01|218854|1|2|specials.  Once PO has been issued these items cannot|Y
01|218854|1|3|be cancelled or returned.|Y
01|218858|1|1|Non-cancellable non-returnable|Y
01|218859|1|1|RGA#TOR-60995/|Y
01|218859|1|2|Repair of PF-2|Y
01|218860|4|1|This is an optional service we offer to thread the draw|Y
01|218860|4|2|nut per end users specified request.  This is a NET|Y
01|218860|4|3|fee only and the end user must provide required|Y
01|218860|4|4|dimensions and machine data.  We have a worksheet that|Y
01|218860|4|5|end users can use to aid in this.  The worksheet is a|Y
01|218860|4|6|requirement in order for Lyndex Nikken to thread it.|Y
01|218860|4|7|***This is 100% optional and was NOT done on previous|Y
01|218860|4|8|order (PO 2363595)***|Y
01|218861|1|1|Additional 5% IMTS early bird promo discount applied.|Y
01|218861|2|1|IMTS early bird promo applied only to CAT50-SZF16-165U-|Y
01|218861|2|2|IDU.|Y
01|218889|7|1|Din N/A|Y
01|218894|2|1|Additional 5% off applied for the holders.|Y
01|218903|1|1|PROMOTION-IMTS24HOLDER 5% has been added to the|Y
01|218903|1|2|discount.|Y
01|218917|8|1|Custom made Adapter Plate with Pneumatic Ports for P160|Y
01|218917|8|2|ZeroVise|Y
01|218923|1|1|Includes motor and cables sets.|Y
01|218924|1|1|1st Batch|Y
01|218924|2|1|1st Batch|Y
01|218927|1|1|Promo IMTS24 5% added to the discount.|Y
01|218927|2|1|Promo IMTS24 5% added to the discount.|Y
01|218934|1|1|*** NET PRICE ***|Y
01|218934|1|2|List Price for the 5AX-201YA-M is $56805.00|Y
01|218934|1|3|Net Price includes motors and cables from table to|Y
01|218934|1|4|machine bulkhead|Y
01|218935|3|1|NET Charge Only - This includes travel expenses labor|Y
01|218935|3|2|air lines and fittings for installation of workholding|Y
01|218935|3|3|on Flint and Walling's 5AX-130. We will install all|Y
01|218935|3|4|components and ensure functionality once completed.|Y
01|218936|4|1|I added the extra 5% to the discount on this tooling.|Y
01|218936|4|2|If you go below $500.00 list the discount will be 35%.|Y
01|218941|17|1|L-N Sales Rep Yas Saeki will provide INST support and|Y
01|218941|17|2|Basic training on site.|Y
01|218942|1|1|1st Batch 1/29:DWG Approved/BTMFGB5/30>6/30#1UPD5/14>>|Y
01|218943|2|1|Adapter Plate for RED200 to Yamazen Supplied Kitagawa|Y
01|218943|2|2|Chuck|Y
01|218944|4|1|IMTS 24 Promotion  of 5% has been added to the discount|Y
01|218944|4|2|on the SK holders only. To qualify the holders must be|Y
01|218944|4|3|$500.00 list price and can be combined.|Y
01|218948|11|1|Also available in 6 8 & 12 Projections|Y
01|218948|12|1|Also available in 6 8 & 12 Projections|Y
01|218970|1|1|Signed approval drawing will be required when|Y
01|218970|1|2|PO is submitted|Y
01|218983|1|1|RGA#LVR-60980/|Y
01|218983|1|2|Reapir of BMT55-SK20Z-85-ICE s/n:21903040 03|Y
01|218983|1|3|(Mimatic#192910)|Y
01|218983|2|1|Bearings seals o-rings to be replaced|Y
01|218984|1|1|Includes motor with brake.|Y
01|218984|2|1|Includes motor with brake.|Y
01|218992|1|1|RGA#LVR-60985/|Y
01|218992|1|2|Repair of MZMP47-ER25X-OFF-HS s/n:23906350 01|Y
01|218992|1|3|(Mimatic#124065)|Y
01|218992|2|1|Bearings seals and o-rings to be replaced|Y
01|218998|1|1|RGA#CUR-60879/|Y
01|218998|1|2|Repair of C40RAM-MI50-180-65TP s/n:21904690 01|Y
01|218998|1|3|(Mimatic#178151)|Y
01|218998|2|1|Bearings seals o-rings and threadring to be replaced|Y
01|219001|1|1|RGA#CUR-60938/|Y
01|219001|1|2|Repair of C40RAM-MI50-180-65TP s/n:82203 02|Y
01|219001|1|3|(Mimatic#178151)|Y
01|219001|2|1|Bearings seals and o-rings to be replaced.|Y
01|219002|1|1|RGA#QUA-60924/|Y
01|219002|1|2|Repair of C40RAM-MI50-180-65TP s/n:22903565 02|Y
01|219002|1|3|(Mimatic#178151)|Y
01|219002|2|1|Bearings seals and o-rings to be replaced.|Y
01|219002|2|2|Tool contaminated with coolant.|Y
01|219024|5|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|219024|5|2|of spindle drawing information.|Y
01|219025|2|1|Discount of 5% extra added to this quote.y|Y
01|219032|1|1|BT50-ER40 Angle Head O-M NeoA|Y
01|219032|1|2|tooling interface for collet system ER40|Y
01|219032|1|3|(Diameter - 260 mm) according to DIN 6499|Y
01|219032|1|4|central coolant supply through spindle|Y
01|219032|1|5|and external coolant over coolant nozzles/pipe|Y
01|219032|1|6|reversal of rotation direction.|Y
01|219032|1|7|input is reversal to output|Y
01|219032|1|8|L = ca. 225 mm / LI = ca. 109 mm|Y
01|219032|1|9|1:1 GEAR MAX 150Nm; 5000RPM;|Y
01|219032|2|1|MOQ: 2|Y
01|219032|3|1|MOQ: 3|Y
01|219032|4|1|MOQ: 4|Y
01|219040|2|1|20% additional Overstock promo discount added.|Y
01|219040|2|2|Final Sale|Y
01|219052|16|1|Additional 20% Overstock promotion discount applied|Y
01|219052|16|2|to this item.  Once a PO is placed this item cannot|Y
01|219052|16|3|be cancelled or returned.|Y
01|219052|16|4|Please note we currently have three (3) of these|Y
01|219052|16|5|holders in stock.|Y
01|219052|22|1|Additional 5% discount applied for the 2024 IMTS|Y
01|219052|22|2|Toolholder promotion.|Y
01|219052|24|1|Additional 5% discount applied for the 2024 IMTS|Y
01|219052|24|2|Live/Static Tool promotion.|Y
01|219054|1|1|Standard Discount 42% 1-10pcs|Y
01|219054|1|2|45% Discount on 11-15pcs|Y
01|219054|1|3|47% Discount on 16-20pcs|Y
01|219054|1|4|50% Discount on 21+pcs|Y
01|219057|6|1|PromotionIMTS24 10% extra discount added to this holder|Y
01|219057|6|2|To maintain this 10% $5000.00 list must be met.|Y
01|219058|1|1|S42-C20-185|Y
01|219058|1|2|Quoted at NET pricing|Y
01|219058|2|1|NCAT50-C42-185U-IDU|Y
01|219058|2|2|NCAT50 milling chuck 42mm 185GL|Y
01|219058|2|3|Quoted at NET pricing|Y
01|219068|1|1|to hold 1/16|Y
01|219072|1|1|Please note: Overstock promotional discount of 20% has|Y
01|219072|1|2|been added to the discount on the live tool.|Y
01|219072|1|3|These are non-returnable.|Y
01|219079|1|1|This is a non-standard stock item and considered|Y
01|219079|1|2|special. Once a PO has been issued it cannot be|Y
01|219079|1|3|cancelled or returned.|Y
01|219083|3|1|H80F-SF0375-3.00B HSK80F Shrink Fit Holder 3/8  30K|Y
01|219083|3|2|With Makino Pins|Y
01|219083|3|3|Requesting price and delivery.|Y
01|219110|1|1|WILL CONVERT 10 STANDARD NUT HOLDERS TO HIGH SPEED|Y
01|219115|1|1|Please Note: Extra 5% added to discount IMTS Promo.|Y
01|219149|2|1|Additional 5% IMTS early bird promo discount applied.|Y
01|219149|4|1|Additional 5% IMTS early bird promo discount applied.|Y
01|219149|9|1|IMTS Early Bird Promo discount applied to|Y
01|219149|9|2|CAT50-SK25-105U-IDU  CAT50-SK10-165U-IDU only.|Y
01|219149|9|3|Applicable for drop-ship order only.|Y
01|219158|1|1|Add SKN-13BJ(GH) + Balance srvc|N
01|219159|1|1|DELIVERY: 58 pcs STOCK 10 pcs 1-2 days ARO.|Y
01|219159|1|2|Remaining 7 pcs - ~4 months|Y
01|219163|5|1|Net pricing|Y
01|219168|3|1|H100A-SF8-300 Slim|Y
01|219168|15|1|HSK63A Shrink Fit Holder 32mm GL120mm CoolantPorts 25K|Y
01|219177|1|1|12 3-jaw Scroll Chuck Setinclude ChuckAdapter Plate|Y
01|219177|1|2|& Hardware|Y
01|219177|2|1|15 3-jaw Scroll Chuck Setinclude ChuckAdapter Plate|Y
01|219177|2|2|& Hardware|Y
01|219177|3|1|This is special non-stock item. Once purchase order is|Y
01|219177|3|2|placed it cannot be cancelled or returned.|Y
01|219210|5|1|Final Part#: MZST68-ER25-AD-ICE|Y
01|219210|5|2|**QUOTED AT NET PRICE**|Y
01|219210|5|3|Please note: This is special non-standard stock. Once|Y
01|219210|5|4|a PO is placed it cannot be cancelled or returned.|Y
01|219215|3|1|A tariff surcharge of 8% will be added to every order|Y
01|219215|3|2|placed after September 1st 2025(until further notice).|Y
01|219215|3|3|This surcharge will be acknowledged upon acceptance|Y
01|219215|3|4|of every order.|Y
01|219230|1|1|*OVERSTOCK promo discount of additional 20% added|Y
01|219230|1|2|Final Sale|Y
01|219234|2|1|For CNC302FA-M SN:10419C|Y
01|219270|4|1|NET price quoted.|Y
01|219277|1|1|Additional 20% Overstock Promo discount applied. Once|Y
01|219277|1|2|a PO is placed this item cannot be cancelled or|Y
01|219277|1|3|returned.|Y
01|219292|1|1|1st Batch/7/16KC:DWG saved in Teams File.|Y
01|219296|2|1|Will provide wrench one free wrench per machine|Y
01|219296|3|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219296|4|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219296|7|1|Will provide wrench one free wrench per machine|Y
01|219296|8|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219296|9|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219296|12|1|Will provide wrench one free wrench per machine|Y
01|219296|13|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219296|14|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219318|5|1|Please Note: 10% extra has been added to the toolholder|Y
01|219318|5|2|discount>> IMTS24 Promotion. If quantities should|Y
01|219318|5|3|change please re-submit for quote.|Y
01|219342|1|1|T/P Inspection Required|Y
01|219342|2|1|T/P Inspection Required|Y
01|219358|1|1|For 5AX-201OSP4-M SN:7424  RGA#TAB-61016|Y
01|219358|1|2|Full rebuild of the table include labor all basic|Y
01|219358|1|3|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|219366|1|1|NBT30-SK20C-90-J|Y
01|219366|1|2|NBT30 DualContact Slim Chuck SK20 JetSlotNut 15K|Y
01|219366|10|1|SKJ25-13C|Y
01|219366|10|2|SK20/SK25 Coolant Cap 13.0mm|Y
01|219366|11|1|SKJ25-13.5C|Y
01|219366|11|2|SK20/SK25 Coolant Cap 13.5mm|Y
01|219366|13|1|SKJ25-16.5C|Y
01|219366|13|2|SK20/SK25 Coolant Cap 16.5mm|Y
01|219379|1|1|Net Pricing|Y
01|219386|1|1|Quoted at NET pricing. Signed appoval drawing required|Y
01|219386|1|2|at time of order.Item is non-standard stock and can|Y
01|219386|1|3|not be cancelled or returned once PO is received.|Y
01|219389|6|1|Please Note: This is a non-standard special item. Once|Y
01|219389|6|2|a PO is placed it cannot be cancelled or returned.|Y
01|219390|1|1|Mori Live; BMT40; ER16; Straight Offset|Y
01|219390|1|2|Speeder Head; External Coolant/|Y
01|219390|1|3|1:3 Gear Max 5Nm; Max In 6000 RPM; Max Out 18000 RPM|Y
01|219390|1|4|L=98mm wrenches: 112954 + 107557|Y
01|219390|1|5|Delivery: Please allow 1wk for approval process upon|Y
01|219390|1|6|receipt of PO. Once approval drawing is signed expect|Y
01|219390|1|7|13-14 weeks for manufacturing and shipping.|Y
01|219390|1|8|Qty Breaks:|Y
01|219390|1|9|1-2 Pcs: $2980/EA 3-5 Pcs: $2750/EA 6+ Pcs: $2630/EA|Y
01|219390|1|10|Once a PO has been issued these cannot be cancelled.|Y
01|219411|1|1|Installed with P/N: PS-868 pull stud at the factory.|Y
01|219411|1|2|Quoted as NET pricing non-returnable non-cancelable|Y
01|219413|10|1|FOR .165 DRILL|Y
01|219413|11|1|FOR M5 X 0.8 TAP W/ .1940 SHANK|Y
01|219416|6|1|HSK63A-ER11M-3.94|Y
01|219416|6|2|HSK63A ER11 COLLET CHUCK|Y
01|219430|1|1|PART# HSK63A-ZDS16-120|Y
01|219430|2|1|PART# BT50-ZDS16-110|Y
01|219430|3|1|PART# BT40-ZDS12-90|Y
01|219430|5|1|PART# ZDK16-10|Y
01|219430|7|1|PART# ZDK16-12-50L|Y
01|219430|8|1|PART# ZDK16-12|Y
01|219431|1|1|PART# BT50-Q42-190|Y
01|219431|5|1|PART# 42-ZMAC140-100AAV|Y
01|219431|9|1|PART# 20-ZMAC42-70AAV|Y
01|219431|10|1|PART# EJX16-16-120|Y
01|219431|12|1|PART# EJX16-10-75|Y
01|219433|1|1|Additional 10% IMTS2024 Promo Discount applied.|Y
01|219433|2|1|Applied only to: MZQT5-C5Z-ICE|Y
01|219433|5|1|Additional 5% IMTS2024 Promo Discount applied.|Y
01|219433|6|1|Applied only to: C5-SK25-75|Y
01|219439|1|1|PART# BT50-RAK-110A|Y
01|219439|3|1|PART# RPC-280|Y
01|219439|4|1|PART# 26-ZMAC55-70AAV|Y
01|219440|3|1|PART# BT50-Q42-190|Y
01|219440|6|1|PART# SP16-16-30|Y
01|219440|7|1|PART# 42-ZMAC140-100V|Y
01|219440|9|1|PART# 16-ZMAC32-55AAV|Y
01|219441|2|1|Additional 5% off for IMTS Early Bird Promotion|Y
01|219441|2|2|applied to this quote.|Y
01|219443|1|1|PART# RMSS-20.0|Y
01|219443|3|1|PART# RDSS-16.0|Y
01|219443|4|1|PART# RFSS-10.0-EVO|Y
01|219443|7|1|PART# RFSS-19.0-DLC|Y
01|219443|8|1|PART# PF-RMSS-15.0|Y
01|219443|10|1|PART# RDSS-10.0|Y
01|219443|12|1|PART# SX-6.0|Y
01|219443|13|1|PART# PF-RFSS-20.0-EVO|Y
01|219443|14|1|PART# RFSS-16.0-DLC|Y
01|219443|15|1|PART# RNS-16.0F|Y
01|219443|16|1|PART# RFSS-10.0-DLC|Y
01|219443|17|1|PART# RFSS-6.0-DLC|Y
01|219443|19|1|PART# PF-RDSS-20.0|Y
01|219443|20|1|PART# PF-RMSS-16.0-EVO|Y
01|219443|21|1|PART# RFSS-10.0|Y
01|219443|23|1|PART# RFSS-6.0-DLC|Y
01|219443|24|1|PART# FMS-6.0|Y
01|219443|25|1|PART# RXS-20.0F|Y
01|219443|26|1|PART# PF-RMSS-16.0|Y
01|219443|27|1|PART# RFSS-10.0-DLC|Y
01|219448|3|1|**BT30-MMC8C-75-A is DCNA**|Y
01|219455|1|1|MOQ: 20|Y
01|219455|1|2|This discount is only available when purchasing 20units|Y
01|219455|1|3|in a single PO. This discount is valid for one month.|Y
01|219455|1|4|(Your Std discount is 28%)|Y
01|219463|22|1|Quoted at NET price.|Y
01|219464|5|1|See IMTS2024 Live Tool Flyer!|Y
01|219470|1|1|Qty Break Offered:|Y
01|219470|1|2|1-2pc standard 32%|Y
01|219470|1|3|3pc+ 35%|Y
01|219475|7|1|Please note: Promotional 5% extra added to your|Y
01|219475|7|2|discount. Must spend $500.00 list price to keep the 5%.|Y
01|219497|1|1|With smooth nut E16-NUT-G|Y
01|219497|2|1|With smooth nut E25-NUT-G|Y
01|219498|1|1|PLATE A:|Y
01|219498|1|2|HSK63A-ZDS16-120 + ZDK16-10|Y
01|219498|1|3|BT50-ZDS16-110 + M10 tap + ZDK16-10|Y
01|219498|1|4|BT40-ZDS12-90 + M8 tap + ZDK12-8|Y
01|219498|1|5|ZDK16-12-50L + M12 tap|Y
01|219498|1|6|ZDK16-12|Y
01|219498|2|1|PLATE B:|Y
01|219498|2|2|BT50-Q42-190 + SP42-42-60 + 20-ZMAC42-70AAV|Y
01|219498|2|3|42-ZMAC140-100AAV|Y
01|219498|2|4|NBT50-C32-105 + K32-Q26-40 + Q26-DJ8-44A + EJX16-10-75|Y
01|219498|2|5|Q26-DJ8-44A + EJX16-16-120|Y
01|219498|2|6|26-ZMAC55-70V + M5HZL|Y
01|219498|3|1|PLATE C:|Y
01|219498|3|2|BT50-RAK-110A + RPC-280 + S.RCC-130|Y
01|219498|3|3|26-ZMAC55-70AAV|Y
01|219498|3|4|26-ZMAC55-70V        (balance stand)|Y
01|219498|3|5|Q26-DJ3-40A + J10-12-55|Y
01|219498|3|6|Q26-DJ3-40A + J10-3-14|Y
01|219498|6|1|PLATE D:|Y
01|219498|6|2|NBT40-Q26-50 + Q26-DJ3-40A + J10-8-40|Y
01|219498|6|3|BT30-Q16-50 + SP16-16-30 + 16-ZMAC32-55AAV|Y
01|219498|6|4|BT50-Q42-190 + 42-ZMAC140-100V|Y
01|219498|8|1|PLATE E:|Y
01|219498|8|2|RMSS-20.0 + RFSS-19.0-DLC + PF-RFSS-20.0-EVO +|Y
01|219498|8|3|PF-RDSS20.0 + RXS-20.0F  (reamer stand)|Y
01|219498|8|4|NCS-20.0 + PF-RMSS-15.0 + RFSS-16.0-DLC +|Y
01|219498|8|5|PF-RMSS-16.0-EVO + PF-RMSS-16.0|Y
01|219498|8|6|RDSS-16.0 + SRS-16.0 + RNS16.0F + RFSS-10.0 +|Y
01|219498|8|7|RFSS-10.0-DLC|Y
01|219498|8|8|RFSS-10.0-EVO + RDSS-10.0 + RFSS-10.0-DLC + HMS-10.0 +|Y
01|219498|8|9|FMS10.0|Y
01|219498|12|1|PLATE E (cont)|Y
01|219498|12|2|NCS-10.0 + HMS-10.0 + RFSS-6.0-DLC + RFSS-6.0-DLC +|Y
01|219498|12|3|SRS-6.0F|Y
01|219498|12|4|HMS-6.0 + SX-6.0 + SRS6.0 + FMS-6.0 + NCS-6.0F|Y
01|219506|21|1|BT30-MMC12C-105-AA-RP   (Nik consign)|Y
01|219506|23|1|PLATE C:    (Nik Consign)|Y
01|219506|23|2|HSK63A-MMC8C-135-AT + EA573KL-15 + MMC CUT SAMPLE|Y
01|219506|32|1|PLATE E:|Y
01|219506|32|2|Demo Part|Y
01|219506|50|1|PLATE H:   (Nik consign)|Y
01|219506|50|2|HSK25E-MVHT4-45 + drill|Y
01|219506|50|3|HSK32E-MVHT6-60 + drill|Y
01|219506|50|4|HSK50E-MVHT-80|Y
01|219506|52|1|PLATE I:|Y
01|219506|52|2|Demo Part|Y
01|219508|1|1|Standard Bot with control and ipad for programming.|Y
01|219509|1|1|PLATE A:|Y
01|219509|1|2|HSK63A-ZDS16-120 + ZDK16-10|Y
01|219509|1|3|BT50-ZDS16-110 + M10 tap + ZDK16-10|Y
01|219509|1|4|BT40-ZDS12-90 + M8 tap + ZDK12-8|Y
01|219509|1|5|ZDK16-12-50L + M12 tap|Y
01|219509|1|6|ZDK16-12|Y
01|219509|2|1|PLATE B:|Y
01|219509|2|2|BT50-Q42-190 + SP42-42-60 + 20-ZMAC42-70AAV|Y
01|219509|2|3|42-ZMAC140-100AAV|Y
01|219509|2|4|NBT50-C32-105 + K32-Q26-40 + Q26-DJ8-44A + EJX16-10-75|Y
01|219509|2|5|Q26-DJ8-44A + EJX16-16-120|Y
01|219509|2|6|26-ZMAC55-70V + M5HZL|Y
01|219509|3|1|PLATE C:|Y
01|219509|3|2|BT50-RAK-110A + RPC-280 + S.RCC-130|Y
01|219509|3|3|26-ZMAC55-70AAV|Y
01|219509|3|4|26-ZMAC55-70V        (balance stand)|Y
01|219509|3|5|Q26-DJ3-40A + J10-12-55|Y
01|219509|3|6|Q26-DJ3-40A + J10-3-14|Y
01|219509|7|1|PLATE D:|Y
01|219509|7|2|NBT40-Q26-50 + Q26-DJ3-40A + J10-8-40|Y
01|219509|7|3|BT30-Q16-50 + SP16-16-30 + 16-ZMAC32-55AAV|Y
01|219509|7|4|BT50-Q42-190 + 42-ZMAC140-100V|Y
01|219512|9|1|PLATE B:   (Nik consign)|Y
01|219512|9|2|NBT50-C32-120 + MCH Cut Sample|Y
01|219512|16|1|NBT50-C32-105  (Nik consign)|Y
01|219512|26|1|BT40-C32-105-RP + KM20-16-RP  (Nik consign)|Y
01|219512|28|1|PLATE E:  Demo Part|Y
01|219512|30|1|PLATE F:|Y
01|219512|30|2|HSK100A-C42EX-135  (Nik consign)|Y
01|219512|30|3|X-treme Endmill    (SY warehouse)|Y
01|219512|32|1|HSK100A-C32EX-120   (Nik consign)|Y
01|219512|34|1|PLATE G:|Y
01|219512|34|2|HSK100A-C25EX-115 + MCH-EX Cut Sample  (Nik consign)|Y
01|219512|38|1|PLATE H:|Y
01|219512|38|2|CCK CKFN Display|Y
01|219512|38|4|PLATE I:|Y
01|219512|38|5|Demo Part|Y
01|219512|38|7|PLATE J:|Y
01|219512|38|8|Demo Part|Y
01|219516|18|1|w/ COLLET + CUT SAMPLE|Y
01|219516|19|1|Competitor CAT40 ER32 Competitor Solid Nut|Y
01|219516|19|2|Sample Part  SK vs ER Workpiece|Y
01|219516|19|3|Sample Part  SK & ER CHIPS|Y
01|219516|43|1|w/ COLLET + CUT SAMPLE|Y
01|219516|44|1|Competitor CAT40 ER32 Competitor Solid Nut|Y
01|219516|47|1|Sample Part   SK vs ER Workpiece|Y
01|219516|47|2|Sample Part   SK & ER Chips|Y
01|219516|56|1|BT50-SK13-165-RP + SK16-15.5-RP   (Nik consign)|Y
01|219516|58|1|PLATE D:|Y
01|219516|58|2|BT50-SK16-165 + SK16-10A + SKN-16B + SK CUT SAMPLES|Y
01|219516|58|3|(Nik consign)|Y
01|219516|74|1|NBT30-MDSK10-60-RPF  + SKN-10SB + SK10-8  (Nik consign)|Y
01|219516|83|1|MDSK CUT SAMPLE|Y
01|219516|92|1|Spindle w/ Dial Gauge **need diam 1/2 long test bar|Y
01|219516|113|1|PLATE L:   Sample Part|Y
01|219516|113|2|PLATE M:   Sample Part|Y
01|219516|113|3|PLATE N:   Sample Part|Y
01|219519|7|1|IMTS24 Promotion 5% has been added to the toolholder|Y
01|219519|7|2|discount.|Y
01|219520|36|1|POSITION BLOCK  - See Tim R|Y
01|219520|38|1|PLATE C:|Y
01|219520|38|2|SEE MIMATIC|Y
01|219520|44|1|CUT SAMPLE|Y
01|219526|5|1|Please note: Promotional 10% has been added to the|Y
01|219526|5|2|discount for the tool holder only.|Y
01|219527|60|1|PLATE F:|Y
01|219527|60|2|ER Collet Display|Y
01|219527|60|3|Demo Part|Y
01|219532|22|1|PLATE D:|Y
01|219532|22|2|Demo Part|Y
01|219532|30|1|1/2 end mill + hex wrench|Y
01|219532|41|1|PLATE G:|Y
01|219532|41|2|Demo Part|Y
01|219533|3|1|Additional 5% off applied to this order for the|Y
01|219533|3|2|2024 IMTS Holder Promotion.|Y
01|219534|12|1|PLATE C|Y
01|219534|12|2|See Eric H/Frank F for tools for demo purpose and|Y
01|219534|12|3|detemine SF-POT-xx 2pc per machine!|Y
01|219536|8|1|Discontinued special discount 5 avail.|Y
01|219538|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS FOR|Y
01|219538|2|2|KITAMURA 3XV VERTICAL MACHINING CENTER|Y
01|219539|1|1|12 WEEKS MANUFACTURE; 2 WEEKS SHIPPING|Y
01|219539|1|2|EXPEDITED FREIGHT CAN BE PURCHASED IF NECESSARY|Y
01|219539|1|3|ASK FOR DIRECT AIR FREIGHT SHIPMENT QUOTE IF NEEDED|Y
01|219544|1|1|RGA#LVR-60997/|Y
01|219544|1|2|Repair of MZMP5-ER40X-OFF-C s/n:59128 01|Y
01|219544|1|3|(Mimatic#131556)|Y
01|219544|2|1|Bearings seals and o-rings to be replaced|Y
01|219544|4|1|RGA#LVR-60997/|Y
01|219544|4|2|Repair of MZMP5-ER40X-OFF-C s/n: 59664 04|Y
01|219544|4|3|(Mimatic#131556)|Y
01|219544|5|1|Bearings seals o-rings and input shaft to be replaced|Y
01|219551|1|1|Please Note: IMTS24 Promotional 5% has been added to|Y
01|219551|1|2|the discount for the SK holder only.|Y
01|219557|1|1|Please Note: IMTS24 promo 5% has been added to the|Y
01|219557|1|2|discount on this quote.|Y
01|219564|1|1|Part# S1-UMT  **QUOTED AT NET PRICE**|Y
01|219564|1|2|1 (25.4mm) Straight Shank Ext UMT Edge Finder Stylus:|Y
01|219564|1|3|6mm Cyl. 31mmOD|Y
01|219564|1|4|.|Y
01|219564|1|5|PLEASE NOTE: This item is special non-standard stock.|Y
01|219564|1|6|It cannot be cancelled or returned upon receipt of PO.|Y
01|219568|2|1|IMTS Promo|Y
01|219568|3|1|IMTS Promo|Y
01|219574|1|1|RGA#CUR-61013/|Y
01|219574|1|2|Repair of C40RAM-ER32-180TS s/n: 1771 01|Y
01|219574|1|3|(Mimatic#13.17.710.11.001)|Y
01|219574|2|1|Bearings seals o-rings and locking lever to be|Y
01|219574|2|2|replaced.|Y
01|219581|1|1|Part# HSK100C-0625-4.00|Y
01|219581|1|2|HSK100C End Mill Holder 5/8 ChipHole 25K|Y
01|219593|1|1|A21-400W-R X2 CONTROLLERS SENT IN 4001 ALARM|Y
01|219593|1|2|RESET CONTROLER VIA RAM CLEAR - RE ENTER PARAMETERS|Y
01|219593|1|3|CONTROLLERS ARE FROM CNCZ100-2W-120A21 SN: 8105/8106|Y
01|219593|3|1|PREVENTATIVE MAINTENANCE PACKAGE|Y
01|219593|3|2|CHECK BACKLASH/THRUST/BRAKE SYSTEM + OIL CHANGE|Y
01|219593|4|1|ADDITONAL LABOR IF NEEDED TO SETUP CONTROLLER AT|Y
01|219593|4|2|CUSTOMER SITE|Y
01|219595|1|1|RGA#LVR-61023/|Y
01|219595|1|2|Repair of MZMP46-ER32Z-ICE s/n:9001 12|Y
01|219595|1|3|(Mimatic#124854)|Y
01|219595|2|1|Bearings seals and o-rings to be replaced.|Y
01|219598|2|1|Additional 20% Overstock Promotion discount|Y
01|219598|2|2|applied.  Once a PO is placed this item cannot be|Y
01|219598|2|3|cancelled or returned.|Y
01|219603|1|1|One time special price show table. Never used.|Y
01|219608|2|1|SPECIAL POSITIONING BLOCK FOR BROTHER W1000|Y
01|219622|1|1|Additional 5% IMTS Live/Static Tool Promo applied.|Y
01|219622|1|2|As this item is special it cannot be cancelled or|Y
01|219622|1|3|returned once a PO is placed.|Y
01|219622|2|1|Applied only to MZQT46-ER32X-OFF|Y
01|219625|2|1|Quick Change Flex Collet 42 19mm|Y
01|219625|3|1|Quick Change Flex collet 42 21mm|Y
01|219625|4|1|Quick Change Flex collet 42 22.5mm|Y
01|219635|2|1|Will provide wrench one free wrench per machine|Y
01|219635|3|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219635|4|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219635|7|1|Will provide wrench one free wrench per machine|Y
01|219635|8|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219635|9|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219635|12|1|Will provide wrench one free wrench per machine|Y
01|219635|13|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219635|14|1|Budgetary Place Holder - Collet Size Type and QTY TBD|Y
01|219640|1|1|No need Inspection|Y
01|219645|4|1|A tariff surcharge may be added to this quotation in|Y
01|219645|4|2|the event of a sustained tariff increase on the|Y
01|219645|4|3|importation of this product.  Any surcharge will be|Y
01|219645|4|4|disclosed prior to acceptance of an order.|Y
01|219650|1|1|Modified to include Coolant Ports. This item is non-|Y
01|219650|1|2|standard stock and cosidered special. Non-cancellable|Y
01|219650|1|3|Non-returnable.|Y
01|219661|1|1|1 piece stk at factory ETA 1-2wks Bal 1 pc 2mths mfg|Y
01|219661|1|2|plus 1-2wks shipping.|Y
01|219664|1|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|219664|2|1|Applied only to MZST63-ER32X|Y
01|219665|1|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|219665|2|1|Applied only to MZST68-SK20X-ICE|Y
01|219666|1|1|Service call for E236 s/n:6783|Y
01|219666|1|2|This is a time based estimate.|Y
01|219666|1|3|Any parts that would be required would be additional.|Y
01|219667|2|1|Live center for manual tailstock P-150S|Y
01|219668|1|1|PLATE A:|Y
01|219668|1|2|HSK63A-ZDS16-120 + ZDK16-10|Y
01|219668|1|3|BT50-ZDS16-110 + M10 tap + ZDK16-10|Y
01|219668|1|4|BT40-ZDS12-90 + M8 tap + ZDK12-8|Y
01|219668|1|5|ZDK16-12-50L + M12 tap|Y
01|219668|1|6|ZDK16-12|Y
01|219668|2|1|PLATE B:|Y
01|219668|2|2|BT50-Q42-190 + SP42-42-60 + 20-ZMAC42-70AAV|Y
01|219668|2|3|42-ZMAC140-100AAV|Y
01|219668|2|4|NBT50-C32-105 + K32-Q26-40 + Q26-DJ8-44A + EJX16-10-75|Y
01|219668|2|5|Q26-DJ8-44A + EJX16-16-120|Y
01|219668|2|6|26-ZMAC55-70V + M5HZL|Y
01|219668|3|1|PLATE C:|Y
01|219668|3|2|BT50-RAK-110A + RPC-280 + S.RCC-130|Y
01|219668|3|3|26-ZMAC55-70AAV|Y
01|219668|3|4|26-ZMAC55-70V        (balance stand)|Y
01|219668|3|5|Q26-DJ3-40A + J10-12-55|Y
01|219668|3|6|Q26-DJ3-40A + J10-3-14|Y
01|219668|6|1|PLATE D:|Y
01|219668|6|2|NBT40-Q26-50 + Q26-DJ3-40A + J10-8-40|Y
01|219668|6|3|BT30-Q16-50 + SP16-16-30 + 16-ZMAC32-55AAV|Y
01|219668|6|4|BT50-Q42-190 + 42-ZMAC140-100V|Y
01|219668|8|1|PLATE E:|Y
01|219668|8|2|RMSS-20.0 + RFSS-19.0-DLC + PF-RFSS-20.0-EVO +|Y
01|219668|8|3|PF-RDSS20.0 + RXS-20.0F  (reamer stand)|Y
01|219668|8|4|NCS-20.0 + PF-RMSS-15.0 + RFSS-16.0-DLC +|Y
01|219668|8|5|PF-RMSS-16.0-EVO + PF-RMSS-16.0|Y
01|219668|8|6|RDSS-16.0 + SRS-16.0 + RNS16.0F + RFSS-10.0 +|Y
01|219668|8|7|RFSS-10.0-DLC|Y
01|219668|8|8|RFSS-10.0-EVO + RDSS-10.0 + RFSS-10.0-DLC + HMS-10.0 +|Y
01|219668|8|9|FMS10.0|Y
01|219668|12|1|PLATE E (cont)|Y
01|219668|12|2|NCS-10.0 + HMS-10.0 + RFSS-6.0-DLC + RFSS-6.0-DLC +|Y
01|219668|12|3|SRS-6.0F|Y
01|219668|12|4|HMS-6.0 + SX-6.0 + SRS6.0 + FMS-6.0 + NCS-6.0F|Y
01|219682|1|1|Plate #1|Y
01|219682|2|1|Plate #1|Y
01|219682|4|1|Plate #2|Y
01|219682|5|1|Plate #2|Y
01|219683|1|1|Eltimon Turret Displays|Y
01|219699|2|1|Quoted at NET price.|Y
01|219706|2|1|2 Tables|Y
01|219708|1|1|Quoted at NET pricing|Y
01|219708|1|2|Non-cancellable Non-returnable|Y
01|219710|1|1|Inspection on x14 Rotary Tables at EMAC|Y
01|219710|1|2|5AX-350 X2 and CNC tables x12|Y
01|219710|1|3|Price includes: Travel/Work Time + Expenses|Y
01|219710|1|4|Will check mechanical backlash/brake system|Y
01|219712|1|1|IMTS 2024 additional 5% discount|Y
01|219712|1|2|Ends 11/30/2024|Y
01|219712|2|1|IMTS 2024 additional 5% discount|Y
01|219712|2|2|Ends 11/30/2024|Y
01|219712|4|1|12 X 36.5 STALLION TRUNNION W/ 2 GRID PATTERN|Y
01|219712|4|2|1/2-13 THREAD W/ .501 LOCATOR BUSHING INCLUDED|Y
01|219712|5|1|PACKAGE INCLUDES (1) 1 X 36 X 12 ALUMINUM TOOLING|Y
01|219712|5|2|PLATE. (6) SLS-16-.75 (6) SLR-16|Y
01|219715|2|1|An additional 5% off has been added to this|Y
01|219715|2|2|2024 IMTS Toolholder Promotion.|Y
01|219731|1|1|Need Makino Pins & must have threads for coolant tubes|Y
01|219731|1|2|Delivery = 10-12 weeks after drawing appoval is signed|Y
01|219731|2|1|Delivery = 10-12 weeks after drawing appoval is signed|Y
01|219731|3|1|Delivery = 10-12 weeks after drawing appoval is signed|Y
01|219742|1|1|Circut Breaker for A21 Controller|Y
01|219742|2|1|Cost to install Breaker on PLC. Cost for 2 days.|Y
01|219742|2|2|Meiji Corp will provide this. We will cover this cost|Y
01|219742|2|3|specially this time.|Y
01|219742|3|1|Expense cost for 3 days and 2 nights for Meiji Corp.|Y
01|219742|3|2|Hotel Meal Gas and etc are included.|Y
01|219749|3|1|Inspection Checkup for all tables at the facility|Y
01|219749|4|1|Oil Change Service for all tables at facility.|Y
01|219762|2|1|Lyndex-Nikken to make positioning block upon receipt of|Y
01|219762|2|2|spindle drawing confirmation.|Y
01|219764|1|1|Qty Break Pricing:|Y
01|219764|1|2|1-11 Pcs: 20% NET price of $1760/EA|Y
01|219764|1|3|12-20 Pcs: 25% NET price of $1650/EA|Y
01|219766|1|1|**DELIVERY: 10 pcs STOCK 20 pcs ETA 9/15|Y
01|219766|1|2|40 pcs ETA mid Sep remaining 5pcs ETA mid Nov.|Y
01|219773|1|1|P/N: C4006-1500-4.50DIN-M|Y
01|219773|1|2|DIN modified|Y
01|219773|1|3|Non-cancellable Non-returnable|Y
01|219787|2|1|A tariff surcharge may be added to this quotation in|Y
01|219787|2|2|the event of a sustained tariff increase on the|Y
01|219787|2|3|importation of this product.  Any surcharge will be|Y
01|219787|2|4|disclosed prior to acceptance of an order.|Y
01|219790|1|1|IMTS special price|Y
01|219792|5|1|CKFN16-6 OD 16mm ID 6mm|Y
01|219792|8|1|CKFN16-12 OD 16mm ID 12mm|Y
01|219801|1|1|Not included: cables Motor Cover and Fanuc Motor.|Y
01|219801|1|2|Ref. S#30345TC|Y
01|219804|6|1|Approval drawing required.|Y
01|219819|1|1|IMTS Special pricing|Y
01|219819|2|1|IMTS Special Pricing|Y
01|219820|11|1|Also available in 6 8 & 12 Projections|Y
01|219820|12|1|Also available in 6 8 & 12 Projections|Y
01|219825|1|1|H80F-SF0500-3.00B|Y
01|219825|1|2|HSK80F Shrink Fit Holder 1/2 DrivePins Balanceable 33K|Y
01|219825|2|1|H80F-SF1000-3.00B|Y
01|219825|2|2|HSK80F Shrink Fit Holder 1 DrivePins Balanceable 33K|Y
01|219825|3|1|H80F-SF0750-3.00B|Y
01|219825|3|2|HSK80F Shrink Fit Holder 3/4 DrivePins Balanceable 33K|Y
01|219825|4|1|H80F-SF0250-3.00B|Y
01|219825|4|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 33K|Y
01|219825|5|1|HSK80F-ER32-3.00B|Y
01|219825|5|2|HSK80F ER32 Collet Chuck HiTorque BearingNut Balanced|Y
01|219825|5|3|33K With Drive Pins|Y
01|219825|7|1|H80F-SF0375-3.00B|Y
01|219825|7|2|HSK80F Shrink Fit Holder 3/8 DrivePins Balanceable 33K|Y
01|219826|1|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|219826|2|1|Applied only to MZST63-ER32X|Y
01|219828|1|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|219828|2|1|Applied only to MZST68-SK20X-ICE|Y
01|219829|1|1|Install E16-NUT & ER16-SCREW(C)|Y
01|219829|2|1|Install E32-NUT & ER32-SCREW(C)|Y
01|219829|3|1|Install (2)S3/4-16X11/16|Y
01|219829|4|1|Install E25-NUT|Y
01|219829|5|1|1st Batch/983090 Max Tool|Y
01|219829|6|1|1st Batch/982909 Gosiger/DRS 6/18:DWG APRVED/DRS|Y
01|219829|7|1|1st Batch/982909 Gosiger/DRS 6/18:DWG APRVED/DRS|Y
01|219829|8|1|1st Batch/982909 Gosiger/DRS 6/18:DWG APRVED/DRS|Y
01|219829|9|1|1st Batch/982909 Gosiger/DRS 6/18:DWG APRVED/DRS|Y
01|219829|10|1|1st Batch/982909 Gosiger/DRS 6/18:DWG APRVED/DRS|Y
01|219830|1|1|Final Part#: NCAT50-C3/4-105U-IDU-DIN|Y
01|219830|1|2|Quoted at NET Price.|Y
01|219830|1|3|Please note this is a custom modified tool. Once a PO|Y
01|219830|1|4|is placed it cannot be cancelled or returned.|Y
01|219835|1|1|Final Part#: NCAT50-C3/4-105U-IDU-DIN|Y
01|219835|1|2|Quoted at NET Price.|Y
01|219835|1|3|Please note this is a custom modified tool. Once a PO|Y
01|219835|1|4|is placed it cannot be cancelled or returned.|Y
01|219839|17|1|Without Motor|Y
01|219839|17|2|Discontinued|Y
01|219850|1|1|Final Part#: NCAT50-C3/4-105U-IDU-DIN|Y
01|219850|1|2|Quoted at NET price.|Y
01|219850|1|3|Please note this is a custom modified tool. Once a PO|Y
01|219850|1|4|has been placed it cannot be cancelled or returned.|Y
01|219857|4|1|12X36.5 Stallion Trunnion with 2 grid pattern|Y
01|219857|4|2|1/2-13 Thread .501D Locator Bushing included.|Y
01|219857|5|1|Package includes (1) 1 x 36 x 12 aluminum tooling|Y
01|219857|5|2|plate. (6) SLS-16-.75 (6) SLR-16|Y
01|219877|5|1|Existing hardware is not guranteed. Failure or|Y
01|219877|5|2|unknown conditions may delay and add cost to install.|Y
01|219877|5|3|Warranty only applicable to supplied hardware.|Y
01|219879|2|1|Promotional 5% has been added to this discount.|Y
01|219890|1|1|With CP and IDU|Y
01|219901|2|1|IMTS Promotion of 5% extra was added to the discount|Y
01|219901|2|2|of the HSK63F-C1-100G.|Y
01|219914|1|1|Quoted at NET pricing|Y
01|219914|1|2|Item is non-standard stockonce a PO is recieved|Y
01|219914|1|3|it can not be cancelled or returned.|Y
01|219921|2|1|Service Call for Sethy Six Calibration Included.|Y
01|219921|2|2|This is a time based estimate.|Y
01|219921|2|3|Any parts that would be required would be additional.|Y
01|219923|1|1|Discount is based upon an order of 5~7 holders. If|Y
01|219923|1|2|quantities should change please resubmit for quote.|Y
01|219929|1|1|CNC400-HFA-6 SN:6078|Y
01|219929|1|2|RGA#TAR-61060|Y
01|219931|1|1|The motor is not icluded.|Y
01|219931|1|2|Customer loyalty discount .|Y
01|219931|2|1|Core deposit for old table.|Y
01|219943|8|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|219943|9|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|219943|10|1|Additional 10% IMTS Early Bird Promo Applied|Y
01|219943|13|1|Applied only to the following items:|Y
01|219943|13|2|NBT30-SF0500-3.15CP NBT30-SF0375-3.15CP NBT30-SF0250-|Y
01|219943|13|3|3.15CP.|Y
01|219947|8|1|Additional 5% IMTS Early Bird Promo discount has been|Y
01|219947|8|2|applied only to items on Lines 1-7 above.|Y
01|219950|1|1|Part# SK6-3.25A|Y
01|219950|1|2|SK6 Slim Chuck Collet 3.25A On Size|Y
01|219952|1|1|1st Batch|Y
01|219965|1|1|TC# E22080-4152-072222|Y
01|219978|2|1|NCAT40-SK13C-180UP-IDU|Y
01|219981|1|1|ADDITIONAL 20% OVERSTOCK PROMOTION DISCOUNT APPLIED.|Y
01|219981|1|2|ONCE A PO IS PLACED THIS ITEM CANNOT BE CANCELLED OR|Y
01|219981|1|3|RETURNED.|Y
01|219983|1|1|RGA#LVR-61048/|Y
01|219983|1|2|Repair of MZQT47-ER32Z-MS-OFF s/n: 20902734 05|Y
01|219983|1|3|(Mimatic#183779)|Y
01|219983|2|1|Replace turret positioning assembly and align tool|Y
01|219983|4|1|RGA#LVR-61048/|Y
01|219983|4|2|Repair of MZQT47-ER32Z-MS-OFF s/n: 21900363 01|Y
01|219983|4|3|(Mimatic#183779)|Y
01|219983|5|1|Replace turret positioning assembly and align tool|Y
01|219989|1|1|Part# TBD Quoted NET Price *Arbor Nut NOT Included*|Y
01|219989|1|2|Special Milling Holder Per print 56-109292|Y
01|219989|1|3|Please note this is special custom item. Once a PO is|Y
01|219989|1|4|placed it cannot be cancelled or returned.|Y
01|219989|1|5|QTY Break NET Pricing:|Y
01|219989|1|6|1 pc: $306.00|Y
01|219989|1|7|2 pcs: $290.00|Y
01|219989|1|8|3+ pcs: $286.00|Y
01|219995|1|1|Special price for this time only. Please Note:|Y
01|219995|1|2|The offer is valid for one month only. Does not apply|Y
01|219995|1|3|to the purchase of a second or subsequent Tool holder.|Y
01|219996|1|1|Engineering Approval Required|Y
01|219996|1|2|Fanuc 400VAC drives|Y
01|219996|1|3|Cable management to be reviewed|Y
01|219996|1|4|Baseplate or table adapter by others|Y
01|219996|2|2|Budgetary pending engineering review.|Y
01|219999|3|1|HSK63A-HC0625-95  HSK63A Hydraulic Chuck 5/8 18K|Y
01|220020|1|1|Signed approval drawing required at time of order.|Y
01|220020|1|2|Item is non-standard stock and can not be cancelled|Y
01|220020|1|3|or returned.|Y
01|220033|4|1|Please Note: IMTS24 promo 5% has been added to your|Y
01|220033|4|2|discount.|Y
01|220036|1|1|BT50-2TG6S-200|Y
01|220036|2|1|BT50-2TG10S-200|Y
01|220045|1|1|Customer asked me my best estimate I said around a|Y
01|220045|1|2|month. Asked if she wanted me to quote it she said no.|Y
01|220049|16|1|internal modification w/Hi-Speed nut|Y
01|220049|19|1|Internal modification w/Hi-Speed nut|Y
01|220050|1|1|RGA#TOR-61072/|Y
01|220050|1|2|Repair of CAT40-C3/4-70U-IDU|Y
01|220050|6|1|RGA#TOR-61072/|Y
01|220050|6|2|Repair of CAT40-C3/4-70U-IDU|Y
01|220051|1|1|BT50-Z24-187|Y
01|220051|1|2|BT50 Z24 Tension/Compression Tap Holder|Y
01|220052|5|1|P/N: CAT40-SK16-180UP-IDU|Y
01|220056|1|1|**QTY BREAK NET PRICING**|Y
01|220056|1|2|1pc $18200.00ea/net|Y
01|220056|1|3|2pc+ $13000.00ea/net|Y
01|220056|5|1|Mazak VDI50 Live ER32 Z<Axial>90D IntCool7MP|Y
01|220056|5|2|**QTY BREAK NET PRICING**|Y
01|220056|5|3|1pc $18100.00ea/net|Y
01|220056|5|4|2pc+ $12800.00ea/net|Y
01|220056|5|5|Delivery: expect 4wks for design time upon receipt of|Y
01|220056|5|6|PO. Additional 14wks for manufacturing and shipping|Y
01|220056|5|7|after approved drawing.|Y
01|220057|2|1|IMTS24 promotion 5% has been added to the discount|Y
01|220057|2|2|on this quote.|Y
01|220059|7|1|TA105R004|Y
01|220064|5|1|CNCZ321MA Inspection Fee|Y
01|220064|5|2|If order a repair or new table we will deny this cost.|Y
01|220067|4|1|IMTS24 promotion 5% has been added to the discount|Y
01|220067|4|2|on this quote.|Y
01|220078|2|1|ADDITIONAL 20% OVERSTOCK PROMOTION DISCOUNT APPLIED.|Y
01|220078|2|2|ONCE A PO IS PLACED THIS ITEM CANNOT BE CANCELLED OR|Y
01|220078|2|3|RETURNED.|Y
01|220079|3|1|Installation includes travel and labor for physically|Y
01|220079|3|2|installing rotary table onto Haas EC1600 machine.|Y
01|220079|3|3|Lyndex will provide the cable set going from rotary|Y
01|220079|3|4|table to bulkhead connection.  Any software options or|Y
01|220079|3|5|other hardware needed from Haas will be the End Users|Y
01|220079|3|6|responsibility as only they can request the items from|Y
01|220079|3|7|Haas.|Y
01|220083|6|1|Please Note: IMTS24Live promotion 5% has been added|Y
01|220083|6|2|to the discount on this quote.|Y
01|220100|1|1|Origin= India / Sold individually and yes there are|Y
01|220100|1|2|shipping charges.|Y
01|220125|1|1|HSK40A-FMC22-50|Y
01|220125|1|2|These are non-standard stock items and|Y
01|220125|1|3|considered specials.  Once a PO has been|Y
01|220125|1|4|issued these items cannot be cancelled or|Y
01|220125|1|5|returned.|Y
01|220135|1|1|Motor installed can do 200/400V|Y
01|220135|1|2|comes with Robodrill standard style cables direct|Y
01|220135|1|3|interface into cabinet.|Y
01|220146|1|1|Angular swiveling version adjustable 107 degrees;|Y
01|220146|1|2|ER25; INT/ EXT/ ICE;|Y
01|220146|1|3|Adjustable Angle Tool|Y
01|220155|1|1|Discount is based upon an order of 5~7 holders. If|Y
01|220155|1|2|quantities should change please resubmit for quote.|Y
01|220158|12|1|CAT40 TO MI50 ADAPTER|Y
01|220162|3|1|Additional 5% discount applied for 2024 IMTS|Y
01|220162|3|2|Promotion for SK Holders as Quoted on # 220162.|Y
01|220167|1|1|Part Number TBD / C8 PSC Reduction Adaptor|Y
01|220167|1|2|GL 6.89 >> 11.811|Y
01|220167|2|1|C8 Shell Mill Holder coolant thru with IDChip Hole|Y
01|220167|2|2|GL 11.81 >> 6.890|Y
01|220170|1|1|HSK100A-SK16C-250|Y
01|220170|2|1|HSK100A-SK16C-300|Y
01|220189|1|1|Repair of 5AX-350|Y
01|220189|1|2|Full rebuild of the table include labor all basic|Y
01|220189|1|3|components(Bearings/Seals/ORings)|Y
01|220189|6|1|Technician to come to facility and remove|Y
01|220189|6|2|5AX-350FA-RCN2 from Machine crate and ready for ship.|Y
01|220189|7|1|Technician to come to facility after repair is complete|Y
01|220189|7|2|Mount and install rotary table check function on|Y
01|220189|7|3|machine.|Y
01|220189|9|1|freight to ship crate from L/N to Aisin|Y
01|220189|10|1|freight to ship repaired 5AX-350FA-RCN2 from L/N|Y
01|220189|10|2|to Aisin|Y
01|220189|10|3|** Estimate **|Y
01|220192|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|220192|2|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|220192|3|1|Req.INS/Install S7/16-20X3/8|Y
01|220192|4|1|Req.INS/Install S5/8-18X1/2|Y
01|220192|5|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|220192|6|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|220192|7|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|220192|8|1|Req.INS/Install E20-NUT|Y
01|220192|9|1|Req.INS/Install E25-NUT|Y
01|220192|10|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|220192|11|1|Req.INS/OD Groove frange Dia issue *SP/Overrun|Y
01|220192|12|1|Req.INS/OD Groove frange Dia issue|Y
01|220196|1|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|220196|2|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|220196|3|1|Applied only to HSK63A-SK10C-105-IDU HSK63A-SK16C-120-|Y
01|220196|3|2|IDU|Y
01|220200|1|1|For CNCZ180SA-BR2/QT-R650 SN:12364|Y
01|220215|1|1|To be installed w/ PS-132 @ Factory|Y
01|220215|2|1|To be installed w/ BT30-TB40-300 @ Factory|Y
01|220215|3|1|To be installed w/ PS-132 @ Factory|Y
01|220215|4|1|To be installed w/ BT30-TB40-150 @ Factory|Y
01|220217|1|1|TCE-97778|Y
01|220217|1|2|For 5AXZ-350FA-RCN2-RJ6 SN:3922|Y
01|220219|1|1|Please Note: Special net pricing quoted for defective|Y
01|220219|1|2|holders originally shipped on SO: 985182 and|Y
01|220219|1|3|Yamazens PO: OD-339015|Y
01|220236|1|1|Additional 20% Overstock Promo discount applied.|Y
01|220236|1|2|Please note: This item cannot be cancelled or returned|Y
01|220236|1|3|upon receipt of PO.|Y
01|220236|2|1|Applied only to SDF-0020-ER11-030M|Y
01|220244|2|1|Additional 20% overstock promotion discount applied.|Y
01|220244|2|2|Once a PO is placed this item cannot be cancelled or|Y
01|220244|2|3|returned.|Y
01|220244|4|1|Additional 20% overstock promotion discount applied.|Y
01|220244|4|2|Once a PO is placed this item cannot be cancelled or|Y
01|220244|4|3|returned.|Y
01|220244|5|1|USED INVENTORY: 70% discount applied to this item.|Y
01|220244|5|2|Please note this sale is final and once a PO is|Y
01|220244|5|3|placed this item cannot be cancelled or returned.|Y
01|220244|7|1|Additional 20% Overstock Promotion discount applied.|Y
01|220244|7|2|Once a PO is placed this item cannot be cancelled or|Y
01|220244|7|3|returned.|Y
01|220252|1|1|Tube dimension 2 Minimum length6.1/2|Y
01|220252|1|2|Max Length 10.5/8 Carton Quantity 198-pcs|Y
01|220266|1|1|Includes cutting area cables|Y
01|220273|3|1|Addtional 20% Overstock Promo added|Y
01|220273|3|2|Final Sale|Y
01|220274|3|1|price matched Koma|N
01|220278|1|1|Delivery: 1-pc in stock / 4-pcs ETA to L-N 09/16|Y
01|220278|1|2|Balance due 10/19 to L-N|Y
01|220285|1|1|REPL for TAT-170 SN:22581B on RGA#TAR-61106 for NEMAK|Y
01|220300|1|1|N/a: C5002-40-6.00|Y
01|220300|1|2|CAT50 40mm Stub Mill 6 Gage Length|Y
01|220300|1|3|Minimum Order Quantity: 10 Pcs|Y
01|220304|3|1|ADDITIONAL 5% DISCOUNT FOR IMTS PROMOTION|Y
01|220308|1|1|Replacment for B30-TESTBAR-8.0|Y
01|220310|5|1|10% ADDITIONAL DISCOUNT FOR IMTS PROMO|Y
01|220315|2|1|STORAGE-FEE CNCZ321MA for Suncall America|Y
01|220315|8|1|CNCZ321MA Inspection Fee|Y
01|220315|8|2|If order a repair or new table we will deny this cost.|Y
01|220319|1|1|**Quoted at NET Price**|Y
01|220319|1|2|Please Note: This is special non-standard stock. Once|Y
01|220319|1|3|a PO has been placed this item cannot be cancelled or|Y
01|220319|1|4|returned.|Y
01|220320|2|1|PROMOTION-IMTS24LIVE 5% has been added to the discount.|Y
01|220322|10|1|5% ADDITIONAL DISCOUNT FOR IMTS HOLDER PROMOTION|Y
01|220323|1|1|T1|Y
01|220323|2|1|T2|Y
01|220323|3|1|T3|Y
01|220323|4|1|T3|Y
01|220323|5|1|T9|Y
01|220323|6|1|T48|Y
01|220323|7|1|T17|Y
01|220323|8|1|T15|Y
01|220323|9|1|BT40-SF0875-3.54CP BT40 Shrink Fit Holder 7/8 Coolant|Y
01|220323|9|2|Ports 25K|Y
01|220323|9|3|T16|Y
01|220323|10|1|T18|Y
01|220323|11|1|T19|Y
01|220323|12|1|T19|Y
01|220323|13|1|T49|Y
01|220323|14|1|T4|Y
01|220323|15|1|T4|Y
01|220323|16|1|T63|Y
01|220323|17|1|T63  >> This is a replacment for B4006-0500-4.00 on|Y
01|220323|17|2|back order for 13 weeks.|Y
01|220323|18|1|T8|Y
01|220323|19|1|T8|Y
01|220323|20|1|T10|Y
01|220323|21|1|T62|Y
01|220323|22|1|T7|Y
01|220323|23|1|T7|Y
01|220323|24|1|T43|Y
01|220323|25|1|T43|Y
01|220323|26|1|T12|Y
01|220323|27|1|T12|Y
01|220323|28|1|T13|Y
01|220323|29|1|T13|Y
01|220323|30|1|T14|Y
01|220323|31|1|T29|Y
01|220323|32|1|T29|Y
01|220323|33|1|T21|Y
01|220323|34|1|T21|Y
01|220323|35|1|T22|Y
01|220323|36|1|T25|Y
01|220323|37|1|T26|Y
01|220323|38|1|T28|Y
01|220323|39|1|T30|Y
01|220323|40|1|T30|Y
01|220323|41|1|T52|Y
01|220323|42|1|T52|Y
01|220323|43|1|T33|Y
01|220323|44|1|T34|Y
01|220323|45|1|T34|Y
01|220323|46|1|T35|Y
01|220323|47|1|T35|Y
01|220323|48|1|T37|Y
01|220323|49|1|T38|Y
01|220323|50|1|T38|Y
01|220323|51|1|T41|Y
01|220323|52|1|T41|Y
01|220323|53|1|T42|Y
01|220323|54|1|T42|Y
01|220323|55|1|T47|Y
01|220323|56|1|T47|Y
01|220323|57|1|T53|Y
01|220323|58|1|T53|Y
01|220323|59|1|T54|Y
01|220323|60|1|T54|Y
01|220323|61|1|T50|Y
01|220323|62|1|T50|Y
01|220323|63|1|T51|Y
01|220323|64|1|T51|Y
01|220323|65|1|T55|Y
01|220323|66|1|T55|Y
01|220323|67|1|T20|Y
01|220323|68|1|T27|Y
01|220323|69|1|T27|Y
01|220323|70|1|T318|Y
01|220323|72|1|IMTS24 Promo 10% has been added to the discount for|Y
01|220323|72|2|SK & Shrink Fit tooling.|Y
01|220328|1|1|Additional 5% IMTS Early Bird Promo applied.|Y
01|220328|2|1|Applicable for HSK50E-SK10C-105P only.|Y
01|220330|11|1|Currently quoting HSK40E ER Collet Chucks to our|Y
01|220330|11|2|factory Price&Delivery of those to be determined.|Y
01|220331|4|1|Additional 20% Overstock Promo Discount applied. Once|Y
01|220331|4|2|a PO is placed this item cannot be cancelled or|Y
01|220331|4|3|returned.|Y
01|220331|5|1|Additional 20% Overstock Promo discount applied. Once a|Y
01|220331|5|2|PO is placed this item cannot be cancelled or returned|Y
01|220331|6|1|Applied only to C5017-0025-4.00DIN C5017-0025B|Y
01|220339|1|1|985930   T/P Inspection Required|Y
01|220339|2|1|1st Batch *Pls. provide Drawing.|Y
01|220341|1|1|1st Batch/(3)980148   5/14 approvedMFG8/14UPD7/29|Y
01|220341|2|1|T/P Inspection Required|Y
01|220341|3|1|T/P Inspection Required|Y
01|220341|4|1|T/P Inspection Required|Y
01|220341|5|1|T/P Inspection Required|Y
01|220341|6|1|T/P Inspection Required|Y
01|220341|7|1|Req.INS/T/P Inspection Required|Y
01|220341|8|1|T/P Inspection Required quired|Y
01|220341|9|1|T/P Inspection Required|Y
01|220341|10|1|Req.INS/T/P Inspection Required|Y
01|220341|11|1|T/P Inspection Required|Y
01|220341|12|1|Req.INS/T/P Inspection Required|Y
01|220341|13|1|Req.INS/T/P Inspection Required|Y
01|220341|14|1|T/P Inspection Required|Y
01|220341|15|1|1st Batch|Y
01|220343|2|1|C4004-0004-4.50|Y
01|220343|2|2|CAT40 Morse Taper MT4 Adapter - 4.50 Gage Length|Y
01|220343|2|3|Minimum Order Quantity of 5 pcs**|Y
01|220343|2|4|Delivery of 20-22 Weeks After Drawing Approval*|Y
01|220361|2|1|Additional 5% off applied to this item for the 2024|Y
01|220361|2|2|IMTS Promotion.|Y
01|220368|1|1|RGA#LVR-61045/|Y
01|220368|1|2|Repair of MNL12-ER40Z-ICE-10K s/n:20900825 01|Y
01|220368|1|3|(Mimatic#124882)|Y
01|220368|2|1|Bearings seals and o-rings to be replaced.|Y
01|220371|1|1|X1 YEAR INSPECTION PLAN|Y
01|220371|3|1|3 YEAR INSPECTION PLAN|Y
01|220371|3|2|5% DISCOUNT OFF EACH YEAR|Y
01|220371|3|3|$5134.75/EA YEAR|Y
01|220371|5|1|5 YEAR INSPECTION PLAN|Y
01|220371|5|2|10% DISCOUNT OFF EACH YEAR|Y
01|220371|5|3|$4864.50/EA YEAR|Y
01|220378|2|1|3 in stock 5 pcs in 2-3 weeks remaining 3 pcs in|Y
01|220378|2|2|3-4 weeks.|Y
01|220390|1|1|CAT40-SF0375-4.00-SP >> Cat40 Shrink Fit 3/8 4''GL|Y
01|220390|1|2|.63 Nose Diameter|Y
01|220390|3|1|Please Note: The extra 20% discount reflects our|Y
01|220390|3|2|Overstock promotion. Once a purchase order is placed|Y
01|220390|3|3|it cannot be cancelled of returned.|Y
01|220404|1|1|Please Note: Discount reflects the L-N Overstock promo.|Y
01|220404|1|2|This holder is non-returnable. We can plug the DIN|Y
01|220404|1|3|holes on this holder.|Y
01|220434|12|1|Hold in ER32 Live Tool with 3/4 Collet|Y
01|220434|13|1|Hold in ER32 Live Tool with 3/4 Collet|Y
01|220444|1|1|RGA#LVR-60954/|Y
01|220444|1|2|Repair of OKE4-ER40Z-ICE  s/n:99251 02 (Mimatic#190233)|Y
01|220444|2|1|Bearings seals and o-rings to be replaced.|Y
01|220449|1|1|RGA#LVR-61063/|Y
01|220449|1|2|Repair of MZMP47-ER25X-OFF-HSC s/n: 87000 02|Y
01|220449|1|3|(Mimatic#124343)|Y
01|220449|2|1|Bearings seals and o-rings to be replaced.|Y
01|220450|1|1|H80F-SF0500-3.00B|Y
01|220450|1|2|HSK80F Shrink Fit Holder 1/2 DrivePins Balanceable 33K|Y
01|220450|2|1|H80F-SF1000-3.00B|Y
01|220450|2|2|HSK80F Shrink Fit Holder 1 DrivePins Balanceable 33K|Y
01|220450|3|1|H80F-SF0750-3.00B|Y
01|220450|3|2|HSK80F Shrink Fit Holder 3/4 DrivePins Balanceable 33K|Y
01|220450|4|1|H80F-SF0250-3.00B|Y
01|220450|4|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 33K|Y
01|220450|5|1|HSK80F-ER32-3.00B|Y
01|220450|5|2|HSK80F ER32 Collet Chuck HiTorque BearingNut Balanced|Y
01|220450|5|3|33K With Drive Pins|Y
01|220450|7|1|H80F-SF0375-3.00B|Y
01|220450|7|2|HSK80F Shrink Fit Holder 3/8 DrivePins Balanceable 33K|Y
01|220452|1|1|RGA#LVR-61117/|Y
01|220452|1|2|Repair of MNL12-ER32Z-ICE-10K s/n: 98901 03|Y
01|220452|1|3|(Mimatic#101523)|Y
01|220452|2|1|Bearings seals and o-rings to be replaced.|Y
01|220455|1|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|220455|2|1|Applicable only to MZQT47-ER32X-ICE|Y
01|220459|4|1|Range: .469-.531|Y
01|220462|2|1|price match Royal|N
01|220462|3|1|THREADING CHARGE WAIVED|Y
01|220462|4|1|FOR HYUNDAI WIA LMTT1800SY A2-6 MAIN SUB|Y
01|220462|4|2|SPINDLE SPECS RECORDED|Y
01|220472|3|1|This item is non-standard stock and considered special.|Y
01|220472|3|2|Once an order is placed it may not be cancelled or|Y
01|220472|3|3|returned. Price quoted is NET price.|Y
01|220473|2|1|Promotional 5% discount added to the|Y
01|220473|2|2|HSK63A-SK16C-120-IDU|Y
01|220475|2|1|This holder is a special non-standard stock.|Y
01|220475|2|2|Once a PO has been received this item cannot be|Y
01|220475|2|3|cancelled or returned.|Y
01|220476|1|1|T101  BT40-SF1250-3.94CP|Y
01|220476|1|2|BT40 Shrink Fit Holder 1.1/4 CoolantPorts 25K|Y
01|220476|2|1|T102|Y
01|220476|3|1|T102|Y
01|220476|4|1|T103|Y
01|220476|5|1|T104|Y
01|220476|6|1|T104|Y
01|220476|7|1|T105|Y
01|220476|8|1|T105|Y
01|220476|9|1|T106|Y
01|220476|10|1|T106|Y
01|220476|11|1|T107|Y
01|220476|14|1|T111|Y
01|220476|15|1|T113|Y
01|220476|16|1|T113|Y
01|220476|17|1|T115|Y
01|220476|18|1|T115|Y
01|220476|19|1|T116|Y
01|220476|20|1|T118|Y
01|220476|23|1|T117|Y
01|220476|24|1|T119|Y
01|220476|25|1|T119|Y
01|220476|26|1|T114|Y
01|220476|27|1|T114|Y
01|220476|28|1|T120|Y
01|220476|30|1|T123|Y
01|220476|31|1|T124|Y
01|220476|32|1|T125|Y
01|220476|33|1|T125|Y
01|220476|34|1|T126|Y
01|220476|35|1|T126|Y
01|220476|36|1|T128|Y
01|220476|37|1|T128|Y
01|220476|38|1|T129|Y
01|220476|39|1|T129|Y
01|220476|40|1|T20|Y
01|220476|41|1|T131|Y
01|220476|42|1|T132|Y
01|220476|43|1|T133|Y
01|220476|44|1|T135|Y
01|220476|45|1|T136|Y
01|220476|46|1|T136|Y
01|220476|47|1|T137|Y
01|220476|48|1|T137|Y
01|220476|49|1|T138|Y
01|220476|50|1|T138|Y
01|220476|51|1|T139|Y
01|220476|52|1|T139|Y
01|220476|53|1|T140|Y
01|220476|54|1|T140|Y
01|220476|56|1|T141|Y
01|220476|57|1|T142|Y
01|220477|1|1|Net price includes the following parts for assembly|Y
01|220477|1|2|at Lyndex-Nikken: HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|220477|1|3|and customers RFID chip. Holders will be re-balanced.|Y
01|220477|2|1|Net price includes the following parts for assembly|Y
01|220477|2|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|220477|2|3|customer's supplied RFID chip and holder re-balanced.|Y
01|220480|1|1|RGA#LVR-61095/|Y
01|220480|1|2|Repair of MZQT5-CT40X-OFF-ICE s/n:82925 02|Y
01|220480|1|3|(Mimatic#189959)|Y
01|220480|2|1|Bearings seals and o-rings to be replaced|Y
01|220480|4|1|RGA#LVR-61095/|Y
01|220480|4|2|Repair of MZQT5-CT40X-OFF-ICE s/n:82925 03|Y
01|220480|4|3|(Mimatic#189959)|Y
01|220480|5|1|Bearings seals and o-rings to be replaced|Y
01|220494|5|1|Installation includes:Dual axis drive unit short bar|Y
01|220494|5|2|fiber optic cables communications cables bulkhead|Y
01|220494|5|3|cables external cablesparameter changes service|Y
01|220494|5|4|time and travel.|Y
01|220496|5|1|Quoted at NET price|Y
01|220499|2|1|Quoted at NET price|Y
01|220501|1|1|BMT75 LIVE; ER25 U-TYPE; 1:1 GEAR MAX 50Nm; 6000RPM;|Y
01|220501|1|2|EXTERNAL COOLANT;  REF DRWG # 00046956|Y
01|220501|2|1|Pricing for Qty 2pcs|Y
01|220502|1|1|P/N: C5006-1000-24.00|Y
01|220502|1|2|CAT50 1 End Mill Holder with max gauge length 24.00|Y
01|220502|7|1|P/N: C5006-1250-24.00|Y
01|220502|7|2|CAT50 1.1/4 End Mill Holder w/ max gauge length 24.00|Y
01|220509|1|1|RGA#LVR-61119/|Y
01|220509|1|2|Repair of MNL12-ER32Z-MS-10K s/n: A0062|Y
01|220509|1|3|(Alps#MSA01-3W000)|Y
01|220509|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|220509|2|2|replaced.|Y
01|220523|2|1|Additional 5% off applied to the holders for the|Y
01|220523|2|2|IMTS Toolholder Promotion.|Y
01|220543|1|1|SHRINK FIT PACKAGE DEAL.|Y
01|220543|1|2|NET 60 TERMS 30 DAY TRIAL GUARANTEE EXCEPT FREIGHT**|Y
01|220543|1|3|BUYER RESPONSIBLE FOR FREIGHT & RETURN IF THEY ELECT TO|Y
01|220543|1|4|RETURN FOR ANY REASON.|Y
01|220543|2|1|HSK63-FI-6-380-PACKAGE PROMO|Y
01|220543|2|2|10 free SF tools included.  See flyer.|Y
01|220545|1|1|Travel and labor for technician to come install the|Y
01|220545|1|2|hydraulic unit on machine with 5C fixture.  Tech will|Y
01|220545|1|3|install hyd unit and get fixturing functioning.|Y
01|220551|1|1|H63A-SF6-160CP|Y
01|220551|1|2|PRICE IS FOR (3) PIECES OF H63A-SF6-160CP|Y
01|220562|1|1|**DELIVERY: 7 pcs STOCK 11 pcs ETA 9/23 to LN|Y
01|220562|1|2|Balance Lead Time Pending...|Y
01|220563|1|2|REPLACEMENT TABLE FOR CNCZ400HFA-6 SN: 6078|Y
01|220563|1|3|SEE REPAIR QUOTE FOR TAR-61060|Y
01|220571|4|1|IMTS Promo 5% has been added to the discount.|Y
01|220574|5|1|Please Note: I added the IMTS promotional 5% to the|Y
01|220574|5|2|discount of the shrink fit holders.|Y
01|220579|5|1|Please note: IMTS promotional discount 5% has been|Y
01|220579|5|2|added to this quote for the SK holders only.|Y
01|220584|8|1|IMTS promotional 10% discount added to the live tooling|Y
01|220584|8|2|wrenches are quoted at no charge.|Y
01|220586|1|1|For CNC202MA SN:31341TC|Y
01|220589|8|1|Additional 10% IMTS Early Bird Promo Discount applied|Y
01|220589|8|2|to C8 Tooling on Lines 1-7 above.|Y
01|220600|1|1|CAT40-ZMAC42-150UV|Y
01|220615|2|1|Bulkhead relocation per customer print A102209.A01|Y
01|220615|2|2|Prep table for aiSV-40 drive /Oi-MF control|Y
01|220615|2|3|ai4/5000 motor required.|Y
01|220615|2|4|SOW: build table to meet specifications ship w/o|Y
01|220615|2|5|cables. Bulkhead to be relocated per customer print|Y
01|220615|4|2|Ascent Global (800)689-6255|Y
01|220615|4|3|Acct# 275585742|Y
01|220615|10|1|FANUC CONTROL|Y
01|220615|10|2|DATA SHEETS AND MACHINE LAYOUT DRAWING REQUIRED|Y
01|220615|10|3|AT TIME OF ORDER|Y
01|220635|2|1|ROYAL PN: 46170|N
01|220635|3|1|ROYAL 46170|N
01|220635|3|2|PRICE MATCHED ROYAL PRODUCTS|N
01|220635|5|1|ROYAL PN: 46150|N
01|220635|6|1|SP ADD QCC-DL65-110 W/ ADAPTER|Y
01|220635|6|2|ROYAL #46150|N
01|220635|6|3|PRICE MATCHED ROYAL PRODUCTS|N
01|220635|9|1|COMPARE TO ROYAL @ $565 ea.|Y
01|220635|10|1|COMPARE TO ROYAL @ $366 ea.|Y
01|220638|1|1|CAT50-SF0500-6.00|Y
01|220638|2|1|CAT50-SF0750-4.00|Y
01|220638|3|1|CAT50-SF0750-6.00|Y
01|220638|7|1|H100A-SF0250-3.346|Y
01|220638|8|1|H100A-SF0250-6.299|Y
01|220638|9|1|H100A-SF0375-3.346|Y
01|220638|10|1|H100A-SF0375-6.299|Y
01|220638|13|1|H100A-SF0500-6.299|Y
01|220638|14|1|H100A-SF0625-6.00|Y
01|220638|16|1|H100A-SF0750-4.133|Y
01|220638|18|1|H100A-SF0750-6.299|Y
01|220638|20|1|H100A-SF1000-4.527|Y
01|220638|22|1|H100A-SF1000-6.299|Y
01|220638|24|1|CAT50-SF0250-4.00|Y
01|220638|25|1|CAT50-SF0250-6.299|Y
01|220641|1|1|RGA#LVR-61114/|Y
01|220641|1|2|Repair of BMT65-ER32Z-MS s/n: 20904747 03|Y
01|220641|1|3|(Mimatic#186493)|Y
01|220641|2|1|Bearings seals o-rings and spindle sleeve to be|Y
01|220641|2|2|replaced.|Y
01|220641|4|1|RGA#LVR-61114/|Y
01|220641|4|2|Repair of BMT65-ER32Z-MS s/n: 20904747 04|Y
01|220641|4|3|(Mimatic#186493)|Y
01|220641|5|1|Bearings seals o-rings and threadring to be replaced.|Y
01|220650|1|1|Additional 5% IMTS Promo discount applied.|Y
01|220650|2|1|Applied only to CAT40-SF4-80 for 2 or more pieces.|Y
01|220663|1|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|220663|4|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|220663|7|1|Applied only to BMT64-ER32X BMT65-ER32Z|Y
01|220664|1|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|220664|4|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|220664|7|1|Applied only to BMT65-ER32X-ICE BMT65-ER32Z-72-ICE|Y
01|220668|1|1|H63A(80)-SF6-80CP|Y
01|220668|1|2|H63A(80) Flange Shrink Fit 6mm ID w/ 80mm gage length|Y
01|220668|1|3|with ChipHole pluggable coolant ports|Y
01|220668|1|4|3-4pc $311.00ea/net|Y
01|220668|1|5|5+pc  $255.00ea/net|Y
01|220668|2|1|H63A(80)-SF6-120CP|Y
01|220668|2|2|H63A(80) Flange Shrink Fit 6mm ID w/  120mm gage length|Y
01|220668|2|3|with ChipHole pluggable coolant ports|Y
01|220668|2|4|3-4pc $329.00ea/net|Y
01|220668|2|5|5+pc  $269.00ea/net|Y
01|220668|3|1|H63A(80)-SF8-80CP|Y
01|220668|3|2|H63A(80) Flange Shrink Fit 8mm ID w/ 80mm gage length|Y
01|220668|3|3|with ChipHole  pluggable coolant ports|Y
01|220668|3|4|3-4pc $311.00ea/net|Y
01|220668|3|5|5+pc  $255.00ea/net|Y
01|220668|8|1|H63A(80)-SF8-120CP|Y
01|220668|8|2|H63A(80) Flange Shrink Fit 8mm ID w/ 120mm gage length|Y
01|220668|8|3|with ChipHole  pluggable coolant ports|Y
01|220668|8|4|3-4pc $329.00ea/net|Y
01|220668|8|5|5+pc  $269.00ea/net|Y
01|220668|9|1|H63A(80)-SF10-85CP|Y
01|220668|9|2|H63A(80) Flange Shrink Fit 10mm ID w/ 85mm gage length|Y
01|220668|9|3|with ChipHole  pluggable coolant ports|Y
01|220668|9|4|3-4pc $311.00ea/net|Y
01|220668|9|5|5+pc  $255.00ea/net|Y
01|220668|10|1|H63A(80)-SF10-120CP|Y
01|220668|10|2|H63A(80) Flange Shrink Fit 10mm ID w/ 120mm gage length|Y
01|220668|10|3|with ChipHole  pluggable coolant ports|Y
01|220668|10|4|3-4pc $329.00ea/net|Y
01|220668|10|5|5+pc  $269.00ea/net|Y
01|220668|15|1|H63A(80)-SF12-90CP|Y
01|220668|15|2|H63A(80) Flange Shrink Fit 12mm ID w/ 90mm gage length|Y
01|220668|15|3|with ChipHole  pluggable coolant ports|Y
01|220668|15|4|3-4pc $311.00ea/net|Y
01|220668|15|5|5+pc  $255.00ea/net|Y
01|220668|16|1|H63A(80)-SF12-120CP|Y
01|220668|16|2|H63A(80) Flange Shrink Fit 12mm ID w/ 120mm gage length|Y
01|220668|16|3|with ChipHole  pluggable coolant ports|Y
01|220668|16|4|3-4pc $329.00ea/net|Y
01|220668|16|5|5+pc  $269.00ea/net|Y
01|220672|2|1|Extra 20% added for overstock please note this cannot|Y
01|220672|2|2|be returned or cancelled|Y
01|220677|1|1|3pcs = 2-3 weeks & balance is pending|Y
01|220679|1|1|C6-SK6-150-IDU w/ taper body like HSK63A per print|Y
01|220679|2|1|C6-SK10-150-IDU w/ taper bodies like HSK63A per print|Y
01|220690|1|1|CAT50 AGH; MI40 QUICK CHANGE; NO COOLANT|Y
01|220690|1|2|L=300mm; L1=190mm;|Y
01|220690|1|3|1:1 GEAR MAX 30Nm; 8000 RPM;|Y
01|220690|1|4|RFEF DRWG # 00056664|Y
01|220695|5|1|ADDITIONAL 5% PROMOTIONAL DISCOUNT|Y
01|220700|6|1|5% ADDITIONAL IMTS PROMOTION DISCOUNT|Y
01|220701|1|1|Net price for Afilados Intertool|Y
01|220701|3|1|Net Price For Afilados Intertool|Y
01|220710|1|1|550-002 Without Slots|Y
01|220710|1|2|2 5C Step Collet|Y
01|220710|2|1|550-003 Without Slots|Y
01|220710|2|2|3 5C Step Collet|Y
01|220712|1|1|RGA#CUR-60952/|Y
01|220712|1|2|Repair of CAT50U-AHT35-210-90 s/n:AKK-08863|Y
01|220713|1|1|RGA#CUR-60952/|Y
01|220713|1|2|Repair of CAT50U-AHT35-210-90 s/n:AKK-08863|Y
01|220715|5|1|PROMOTION for $750.00 of tooling with the purchase of|Y
01|220715|5|2|a Presetter E346+ or E346V+|Y
01|220727|4|1|BT40-TB40-300|Y
01|220727|4|2|BT40 Test Bar 40x300mm|Y
01|220728|1|1|Additional 10% IMTS Early Bird Promo discounta applied|Y
01|220728|4|1|Additional 10% IMTS Early Bird Promo discount applied.|Y
01|220728|4|2|This item cannot be cancelled or returned once a PO is|Y
01|220728|4|3|placed as it is special non-standard stock.|Y
01|220728|5|1|Applicable only to HSK63A-C3/4-110-IDUHSK63A-CZF32-130|Y
01|220740|1|1|List = $327.00|Y
01|220740|2|1|List = $325.00|Y
01|220749|2|1|Total 2days Work for Weekday.|Y
01|220749|4|1|Total 2days Work for Weekend.|Y
01|220750|1|1|REPLACEMENT CABLE SET|Y
01|220750|1|2|5AX-230OSP - ROTARY AXIS.|Y
01|220750|1|3|SN: 5006|Y
01|220751|2|1|Total 2days Work for Weekday.|Y
01|220751|4|1|Total 2days Work for Weekend.|Y
01|220762|1|1|Please Note: This is special non-standard stock. Once|Y
01|220762|1|2|a PO is placed this item cannot be cancelled or|Y
01|220762|1|3|returned.|Y
01|220771|1|1|No need Ins.|Y
01|220773|1|1|$60000 FACE VALUE TOOLING CERTIFICATE|Y
01|220788|1|1|with Pull Stud PS-876|Y
01|220788|2|1|with Pull Stud PS-876|Y
01|220788|3|1|with Pull Stud PS-805|Y
01|220788|4|1|BT40-TB40-300|Y
01|220788|4|2|BT40 Test Bar 40x300mm|Y
01|220788|4|3|with Pull Stud PS-805|Y
01|220800|4|1|Base plate for VF2|Y
01|220814|1|1|Non-cancellable/Non-returnable|Y
01|220814|2|1|Non-cancellable/Non-returnable|Y
01|220819|2|1|Please note the additional 5% discount per IMTS promo|Y
01|220820|2|1|Total 2days Work for Inspection for Weekday.|Y
01|220820|5|1|Total 2days Work for Inspection for Weekend.|Y
01|220823|1|1|This includes travel time labor and lodging expenses|Y
01|220823|1|2|for one technician.  15 tables Aisin has will be approx|Y
01|220823|1|3|one full day for a single tech.  The technician will|Y
01|220823|1|4|check backlash and overall health of each table.|Y
01|220823|1|5|Oil change is not included but can be quoted upon|Y
01|220823|1|6|request.|Y
01|220828|1|1|Cancellation fee for PO# 105310-00-TA (SO#986565)|Y
01|220828|1|2|This fee can be waived with the receipt of PO of|Y
01|220828|1|3|equivalent or more value ($24771.26) by 9/30/24.|Y
01|220833|1|1|Additional 5% IMTS Early Bird Promo discount applied.|Y
01|220833|4|1|Applicable only to: MZMP46-ER32X-OFF|Y
01|220839|6|1|ADDITIONAL 5% DISCOUNT - IMTS PROMOTION|Y
01|220847|2|1|Please note additional 10% discount for IMTS promo|Y
01|220850|1|1|Replacement for NA8M|Y
01|220853|6|1|Customer M-codes or selector switches required.|Y
01|220853|7|1|2 table installation w/ pancake cyclinders and 5C nose|Y
01|220853|7|2|2 Base plates to accept tailstock and CNCZ180|N
01|220853|7|3|2 sets of hydraulic hoses control wiring to Customer|Y
01|220853|7|4|...terminal block. Control options & M-codes required|Y
01|220853|7|5|...by others.|Y
01|220855|1|1|This item is for custom applications.|Y
01|220855|1|2|Signed customer agreement form and application approval|Y
01|220855|1|3|required prior to PO.|Y
01|220855|2|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|220855|2|2|of spindle drawing confirmation.|Y
01|220860|2|1|This is a NET price only - No discount applies.|Y
01|220860|2|2|This is a certified refurbished servo motor for|Y
01|220860|2|3|the rotary table to be installed by Yamazen on customer|Y
01|220860|2|4|TC-S2DN-0 Brother machine.  Standard warranty does not|Y
01|220860|2|5|apply to servo motor.|Y
01|220864|1|1|RGA#LVR-61127/|Y
01|220864|1|2|Repair of MNZ20-SK16X-ICE-12K s/n:19903864 12|Y
01|220864|1|3|(Mimatic#193568)|Y
01|220864|2|1|Bearings seals and o-rings to be replaced.|Y
01|220881|1|1|Item is non-standard stockonce a PO has been received|Y
01|220881|1|2|it can not be cancelled or returned.|Y
01|220888|1|1|THIS PRESETTER HAS AUTOFOCUS|Y
01|220892|2|1|NBT50 speeder head suitable for Neo A (O-M) with i=1:2|Y
01|220892|2|2|gear ratio and MI50 Special Pin(20 deg taper) Frange|Y
01|220892|2|3|distance 75mm|Y
01|220892|2|4|SP Order. Net Price Each. Cancellations will not be|Y
01|220892|2|5|accepted after the PO has been received.|Y
01|220892|2|6|Delivery 20weeks(Dsgn 5wks Mfg 12wks Dlvry 2-3wks)|Y
01|220892|8|1|Additional MI50 adapter Shell End Mill Adapter 125:|Y
01|220892|8|2|SP Order. Net Price Each. Cancellations will not be|Y
01|220892|8|3|accepted after the PO has been received.|Y
01|220892|8|4|Delivery 20weeks(Dsgn 5wks Mfg 12wks Dlvry 2-3wks)|Y
01|220914|2|1|Please note additional 20% discount for this overstock|Y
01|220914|2|2|item...this cannot be returned or cancelled once PO is|Y
01|220914|2|3|received|Y
01|220918|1|1|T/P Inspection Required|Y
01|220918|2|1|T/P Inspection Required|Y
01|220934|8|1|Quoted at NET pricing|Y
01|220934|8|2|Note:Item is non-standard stockonce a PO has been|Y
01|220934|8|3|received it cannot be cancelled or returned.|Y
01|220936|1|1|1 Pc: 2 Week Lead Time|Y
01|220936|1|2|2-4 Pcs: 3.5 Months Lead Time|Y
01|220941|1|1|IT50 SF holder|Y
01|220946|10|1|A tariff surcharge may be added to this quotation in|Y
01|220946|10|2|the event of a sustained tariff increase on the|Y
01|220946|10|3|importation of this product.  Any surcharge will be|Y
01|220946|10|4|disclosed prior to acceptance of an order.|Y
01|220947|12|1|A tariff surcharge may be added to this quotation in|Y
01|220947|12|2|the event of a sustained tariff increase on the|Y
01|220947|12|3|importation of this product.  Any surcharge will be|Y
01|220947|12|4|disclosed prior to acceptance of an order.|Y
01|220948|13|1|A tariff surcharge may be added to this quotation in|Y
01|220948|13|2|the event of a sustained tariff increase on the|Y
01|220948|13|3|importation of this product.  Any surcharge will be|Y
01|220948|13|4|disclosed prior to acceptance of an order.|Y
01|220956|1|1|P/N: TBD  Mim# 174670 VDI40 Live ER32 90Deg RH Int/Ext|Y
01|220957|3|1|Includes: Dual axis drive unit short bar fiber optic|Y
01|220957|3|2|cables communications cables bulkhead cables 2-sets|Y
01|220957|3|3|external cables 2-sets parameter changes service|Y
01|220957|3|4|time and travel.|Y
01|220959|8|1|IMTS promotional 5% has been added to the discount on|Y
01|220959|8|2|this quote. Valid until 11/29/2024!!! Thank you!|Y
01|220963|1|1|Overstock promo discount of 20% applied.|Y
01|220963|1|2|Final Sale|Y
01|220967|9|1|CAT50-ER25-6.00BN|Y
01|220967|9|2|CAT50 ER25 Collet Chuck HiTorque BearingNut NutSwap_Mod|Y
01|220967|10|1|CAT50-ER32-6.00BN|Y
01|220967|10|2|CAT50 ER32 Collet Chuck HiTorque BearingNut NutSwap_Mod|Y
01|220979|1|1|BMT45 LIVE; STRAIGHT ADJUSTABLE HEAD ER16 107DEG;|Y
01|220979|1|2|INT/EXT/ICE 1015PSI;|Y
01|220979|1|3|1:1 GEAR MAX 12Nm; 6500RPM|Y
01|220981|1|2|Please note this is special non-standard stock. Once|Y
01|220981|1|3|a PO is placed it cannot be cancelled or returned.|Y
01|220985|3|1|Additional 20% Overstock Promo discount applied.|Y
01|220985|3|2|Please note: This item cannot be cancelled or returned.|Y
01|220985|5|1|Applied only to CAT40-SF0750-6.30|Y
01|220995|1|1|1st Batch/988548 *have not received DWG as of 8/30|Y
01|221010|1|1|Estimated time of arrival 2 weeks|Y
01|221012|36|1|A tariff surcharge may be added to this quotation in|Y
01|221012|36|2|the event of a sustained tariff increase on the|Y
01|221012|36|3|importation of this product.  Any surcharge will be|Y
01|221012|36|4|disclosed prior to acceptance of an order.|Y
01|221013|2|1|Please note: This is a custom special item. Once a PO|Y
01|221013|2|2|is placed it cannot be cancelled or returned.|Y
01|221013|2|3|**W/O ID chip hole**|Y
01|221013|4|1|Please Note: This is special non-standard stock. Once|Y
01|221013|4|2|a PO is placed this item cannot be cancelled or|Y
01|221013|4|3|returned.|Y
01|221016|6|1|IMTS extra 10% has been added to the discount on this|Y
01|221016|6|2|quote. If any tooling changes please re-submit for|Y
01|221016|6|3|quote.|Y
01|221019|1|1|RGA#LVR-61133/|Y
01|221019|1|2|Repair of MZMP47-ER25X-Off-HS s/n:21880 01|Y
01|221019|1|3|(Mimatic#124065)|Y
01|221019|2|1|Bearings seals and o-rings and input shaft to be|Y
01|221019|2|2|replaced.|Y
01|221023|1|1|Overstock promotion applied additional 20%|Y
01|221023|1|2|Final Sale|Y
01|221024|1|1|Quoted at NET pricing|Y
01|221027|1|1|RGA#LVR-61128/|Y
01|221027|1|2|Repair of MNZ20-SK16X-ICE-12K s/n: 20902074 02|Y
01|221027|1|3|(Mimatic#193568)|Y
01|221027|2|1|Bearings seals o-rings and spindle to be replaced.|Y
01|221027|4|1|RGA#LVR-61128/|Y
01|221027|4|2|Repair of MNZ20-SK16X-ICE-12K s/n: 20905017 15|Y
01|221027|4|3|(Mimatic#193568)|Y
01|221027|5|1|Bearings seals o-rings and spindle to be replaced.|Y
01|221027|7|1|RGA#LVR-61128/|Y
01|221027|7|2|Repair of MNZ20-SK16X-ICE-12K s/n: 20905017 17|Y
01|221027|7|3|(Mimatic#193568)|Y
01|221027|8|1|Bearings seals o-rings spindle and threadring to be|Y
01|221027|8|2|replaced.|Y
01|221027|10|1|RGA#LVR-61128/|Y
01|221027|10|2|Repair of MNZ20-SK16X-ICE-12K s/n: 20905017 18|Y
01|221027|10|3|(Mimatic#193568)|Y
01|221027|11|1|Bearings seals o-rings and spindle to be replaced.|Y
01|221035|1|1|Overstock Promotion|Y
01|221035|1|2|*** All sales are final ***|Y
01|221043|4|1|6 Port Rotary Union 3000psi max.  This will be the same|Y
01|221043|4|2|style as the standard rotary union just with higher|Y
01|221043|4|3|pressure range.  Made to order and once ordered|Y
01|221043|4|4|cannot be canceled.|Y
01|221044|2|1|Please note additional 5% discount added per IMTS promo|Y
01|221048|1|1|With Makino Pins Installed|Y
01|221048|2|1|H80F-SF1000-3.00B|Y
01|221048|2|2|HSK80F Shrink Fit Holder 1 DrivePins Balanceable 33K|Y
01|221048|3|1|H80F-SF0750-3.00B|Y
01|221048|3|2|HSK80F Shrink Fit Holder 3/4 DrivePins Balanceable 33K|Y
01|221048|4|1|HSK80F-ER25-3.00B|Y
01|221048|4|2|HSK80F ER32 Collet Chuck HiTorque BearingNut Balanced|Y
01|221048|4|3|33K With Drive Pins|Y
01|221048|6|1|H80F-SF0500-3.00B|Y
01|221048|6|2|HSK80F Shrink Fit Holder 1/2 DrivePins Balanceable 33K|Y
01|221048|8|1|H80F-SF0375-3.00B|Y
01|221048|8|2|HSK80F Shrink Fit Holder 3/8 DrivePins Balanceable 33K|Y
01|221048|9|1|H80F-SF0250-3.00B|Y
01|221048|9|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 33K|Y
01|221057|4|1|H50E-SF3-80|Y
01|221057|4|2|HSK50E Shrink Fit Holder 3mm 25K|Y
01|221057|4|3|Delivery is based upon receipt of purchase order after|Y
01|221057|4|4|final approval drawing is received. Once a order is|Y
01|221057|4|5|placed it cannot be cancalled or returned.|Y
01|221057|12|1|$1000.00 Tooling Credit with the purchase of a L-N|Y
01|221057|12|2|SF-START2-UNIT-200.|Y
01|221066|1|1|RGA#LVR-61148/|Y
01|221066|1|2|Repair of MNL12-ER32X-C-7MP s/n:A0025 (Alps#T32478)|Y
01|221066|2|1|Bearings o-rings and collet nut to be replaced.|Y
01|221066|4|1|RGA#LVR-61148/|Y
01|221066|4|2|Repair of MNL12-ER25Y-MD s/n:A0092 (Alps#MSA01-6J000)|Y
01|221066|5|1|Bearings o-rings collet nuts drive shaft and gears|Y
01|221066|5|2|to be replaced.|Y
01|221069|1|1|PRICE INCLUDES 10 CAT40 HOLDERS WITH COOLANT PORTS|Y
01|221070|1|1|RGA#CUR-61090/|Y
01|221070|1|2|Repair of C50-MRAM s/n:23905467 03 (Mimatic#162732)|Y
01|221070|2|1|Bearings seals and o-rings to be replaced.|Y
01|221078|1|1|Additional 20% OVERSTOCK promo discount applied. This|Y
01|221078|1|2|item is non-cancellable and non-returnable.|Y
01|221080|1|1|Please note: This is special non-standard stock. Once|Y
01|221080|1|2|a PO is placed it cannot be cancelled or returned.|Y
01|221088|1|1|Includes cables|Y
01|221089|49|1|Please note: This is special nonstandard stock. This|Y
01|221089|49|2|item cannot be cancelled or returned after PO is placed|Y
01|221089|49|3|Minimum Order Quantity: 5|Y
01|221090|1|1|Remainaing Balance of 2 due week of 10/7/2024.|Y
01|221091|1|1|P/N: HSK80C-C1.1/4- XXXG|Y
01|221111|1|1|With Makino Pins Installed|Y
01|221111|2|1|H80F-SF1000-3.00B|Y
01|221111|2|2|HSK80F Shrink Fit Holder 1 DrivePins Balanceable 33K|Y
01|221111|3|1|H80F-SF0750-3.00B|Y
01|221111|3|2|HSK80F Shrink Fit Holder 3/4 DrivePins Balanceable 33K|Y
01|221111|4|1|HSK80F-ER25-3.00B|Y
01|221111|4|2|HSK80F ER32 Collet Chuck HiTorque BearingNut Balanced|Y
01|221111|4|3|33K With Drive Pins|Y
01|221111|6|1|H80F-SF0500-3.00B|Y
01|221111|6|2|HSK80F Shrink Fit Holder 1/2 DrivePins Balanceable 33K|Y
01|221111|7|1|H80F-SF0375-3.00B|Y
01|221111|7|2|HSK80F Shrink Fit Holder 3/8 DrivePins Balanceable 33K|Y
01|221111|8|1|H80F-SF0250-3.00B|Y
01|221111|8|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 33K|Y
01|221127|2|1|NBT50 DualContact ER32 Flex AngleHead 80mm Pitch|Y
01|221127|2|2|IntCoolant w/ distance from Gauge Line to Flange|Y
01|221127|2|3|Surface of 75mm and extra 10 degree taper to|Y
01|221127|2|4|positioning pin and positioning block.|Y
01|221127|2|5|SP Order. Net Price Each. Cancellations will not be|Y
01|221127|2|6|accepted after the PO has been received.|Y
01|221127|2|7|Delivery 20weeks(Dsgn 4wks Mfg 10wks Dlvry 2-3wks)|Y
01|221128|1|1|MIMATIC PART # 174670|Y
01|221130|7|1|Quoted at NET price|Y
01|221132|1|1|CNC400HFA-6 SN: 1064|Y
01|221132|1|2|RGA#TAR-61116|Y
01|221139|1|1|This is special non-standard stock. Once a PO is place|Y
01|221139|1|2|d this item cannot be cancelled or returned.|Y
01|221147|5|1|Please note: IMTS Special 10% extra has been added to|Y
01|221147|5|2|the discount. If the list price goes under $5000.00|Y
01|221147|5|3|I can honor 5% (40%).|Y
01|221148|2|1|Please note additional 5% discount added per IMTS promo|Y
01|221160|1|1|Would be CNC1600 with Okuma Motor - you can removed the|Y
01|221160|1|2|FA-M and repalce with OPS4-M|Y
01|221160|1|3|****** Morris South - NET PRICE********|Y
01|221160|3|1|Heidenhain Scale +/-2 with scale mounting kit.|Y
01|221160|3|2|Note: The table will require a riser to provide space|Y
01|221160|3|3|for the scale.|Y
01|221168|1|1|RPLC for BOAT #923/00/2024 Undershipment|Y
01|221168|1|2|9/13RY:Offset by BOAT#1065/00/2024 overshipment|Y
01|221170|7|1|Please Note: IMTS promotion 5% has been added to your|Y
01|221170|7|2|dicount on this quote.|Y
01|221172|1|1|1st Batch/969287|Y
01|221172|2|1|1st Batch/Stock|Y
01|221177|18|1|IMTS holder promo discount of 10% has been added to|Y
01|221177|18|2|the standard discount of 25% based on quantity quoted|Y
01|221189|27|1|IMTS toolholder promo additional discount of 10% has|Y
01|221189|27|2|been added to the quote based on quoted amount|Y
01|221208|1|1|Please Note: This is special non-standard stock.|Y
01|221208|1|2|Once a PO is placed it cannot be cancelled or|Y
01|221208|1|3|returned.|Y
01|221208|1|4|'|N
01|221233|1|1|Quoted at NET pricing|Y
01|221237|1|1|BRS-6.2|Y
01|221237|1|2|HSS Broach Reamer ST Shank 6.2mm|Y
01|221237|2|1|BRS-6.21|Y
01|221237|2|2|HSS Broach Reamer ST Shank 6.21mm|Y
01|221237|3|1|BRS-6.27|Y
01|221237|3|2|HSS Broach Reamer ST Shank 6.27mm|Y
01|221237|4|1|BRS-6.3|Y
01|221237|4|2|HSS Broach Reamer ST Shank 6.3mm|Y
01|221242|2|1|Additional 5% IMTS Promotional Discount added to|Y
01|221242|2|2|this item for Live & Static Tools.|Y
01|221244|1|1|MZMP46-STC4X-L-MS|Y
01|221244|1|2|Dual Tool Single Station C4 Static Holder|Y
01|221244|1|3|Left Hand Orientation|Y
01|221244|2|1|MZMP46-STC4X-R-MS|Y
01|221244|2|2|Dual Tool Single Station C4 Static Holder|Y
01|221244|2|3|Right Hand Orientation|Y
01|221245|3|1|Please Note: The Center Height is 70mm. We think this|Y
01|221245|3|2|machine uses a 65mm Check the turret swing diameter to|Y
01|221245|3|3|make sure it will work on the machine.|Y
01|221245|3|4|70mm is the shortest we offer.|Y
01|221248|2|1|STORAGE-FEE CNCZ321MA for Suncall America|Y
01|221248|5|1|Remove the table from CF#7. Install the table in L-N.|Y
01|221248|6|1|Remove the table from CF#7.|Y
01|221248|6|2|Remove the table from CF#5 and install it on CF#7.|Y
01|221248|7|1|Remove the table from CF#7.|Y
01|221248|7|2|Remove the table from CF#5 and install it on CF#7.|Y
01|221248|7|3|Remove the table from CF#4.|Y
01|221251|3|1|Quoted at NET price and once a purchase order is|Y
01|221251|3|2|placed for DIN holders it cannot be cancelled or|Y
01|221251|3|3|returned.|Y
01|221253|1|1|Mimatic 124021|Y
01|221259|3|1|IMTS24 promotion 5% has been added to the discount on|Y
01|221259|3|2|this quote.|Y
01|221271|1|1|5AX-2002HEA-6PR SN:2302|Y
01|221287|1|1|standard with solid arbor screw|Y
01|221287|5|1|**DIN - Coolant Through Flange**|Y
01|221287|6|1|Extra discount applies for AS-IS tool holder:|Y
01|221287|6|2|B4001-1500-2.00DIN|Y
01|221288|1|1|1st Batch|Y
01|221288|2|1|1st Batch|Y
01|221295|1|1|15 3-Jaw Steel Body Adjustable Setrite Scroll Chuck -|Y
01|221295|1|2|Flatback - includes one set of American Standard Tongue|Y
01|221295|1|3|and Groove master and reversible top jaws mounting|Y
01|221295|1|4|bolts chuck key and owner's manual|Y
01|221295|2|1|D1-6 Adapter Plate machined to fit 15 Setrite|Y
01|221295|3|1|15 3-Jaw Non-Adjustable Super Precision Scroll Chuck|Y
01|221295|3|2|- Flatback - includes one set of American Standard|Y
01|221295|3|3|Tongue and Groove master and reversible hard top jaws|Y
01|221295|3|4|mounting bolts chuck key|Y
01|221295|4|1|D1-6 Adapter Plate machined to fit 15 Super Precision|Y
01|221300|1|1|No Inspection Required|Y
01|221300|2|1|No Inspection Required|Y
01|221300|3|1|No Inspection Required|Y
01|221300|4|1|No Inspection Required|Y
01|221300|5|1|No Inspection Required|Y
01|221300|6|1|No Inspection Required|Y
01|221300|7|1|No Inspection Required|Y
01|221301|1|1|Holders are in BOAT INV#1051/2/1 No Inspection Required|Y
01|221303|1|1|Mazak VDI 40 Static PSC C4 X<Radial>STRT MAIN SUB|Y
01|221303|1|2|Delivery: 1 Pc: 2 Weeks 2+ Pcs: 8-10 Weeks|Y
01|221305|3|1|Please Note: IMTS Promo 5% has been added to the|Y
01|221305|3|2|discount on this quote. Thank you|Y
01|221308|1|1|1st Batch/987519 Grainger/Suncast3|Y
01|221310|1|1|Additional 5% IMTS Promo discount applied.|Y
01|221310|2|1|Applied only to MZQT47-OD10X|Y
01|221312|1|1|MNZ20-OD20X|Y
01|221312|1|2|Mori BMT40 Static OD1 SQ X<Radial>STRT ExtCool|Y
01|221316|1|1|Additional 5% IMTS Promo discount applied. (For|Y
01|221316|1|2|purchase of at least 2)|Y
01|221316|2|1|Additional 5% IMTS Promo discount applied.|Y
01|221316|2|2|(For purchase of at least 1)|Y
01|221316|2|3|**Lead Time: ETA 10/18 for PO placed by 9/25**|Y
01|221320|2|1|Balance of one (1) available week of 10/14 ARO|Y
01|221326|3|1|Please Note: IMTS promo 5% has been to the discount|Y
01|221326|3|2|on this quote. Thank you!!|Y
01|221332|1|1|Please Note: This tool has been discontinued. Please|Y
01|221332|1|2|reference MZMP47-ER32X-OFF-HS2-ICE for replacement.|Y
01|221341|24|1|Please Note: IMTS promo 10% has been added to the|Y
01|221341|24|2|discount in this quote. If quantities change please|Y
01|221341|24|3|re-submit for quote. Thank you|Y
01|221346|6|1|Please Note: IMTS promotion 5% has been added to the|Y
01|221346|6|2|discount on this quote. Thank you|Y
01|221350|2|1|H63F-SF0250-3.149|Y
01|221350|3|1|H63F-SF0250-4.75|Y
01|221350|4|1|H63F-SF0250-6.30|Y
01|221350|6|1|H100A-SF0250-3.346|Y
01|221350|8|1|CAT50-SF0250-4.00|Y
01|221350|9|1|HSK63F-SF0375-4.724|Y
01|221350|10|1|H63F-SF0375-6.30|Y
01|221350|11|1|H100A-SF0375-3.346|Y
01|221350|13|1|H100A-SF0375-6.30|Y
01|221350|14|1|CAT50-SF0375-4.00|Y
01|221350|15|1|CAT50-SF0375-6.00|Y
01|221350|16|1|H63F-SF0500-3.149|Y
01|221350|17|1|H63F-SF0500-4.724|Y
01|221350|19|1|H63F-SF0500-6.30|Y
01|221350|20|1|H100A-SF0500-3.74|Y
01|221350|23|1|CAT50-SF500-6.00|Y
01|221350|24|1|H63F-SF0750-3.937|Y
01|221350|25|1|H63F-SF0750-6.30|Y
01|221350|26|1|H100A-SF0750-4.133|Y
01|221350|28|1|CAT50-SF0750-4.00|Y
01|221350|29|1|CAT50-SF0750-6.00|Y
01|221363|1|1|16 in stock additional 28 - delivery will be 4~5 weeks|Y
01|221363|1|2|after receipt of order.  The balance of 56 will be|Y
01|221363|1|3|20~22 weeks for manufacturing after receipt of order.|Y
01|221378|1|1|This is not available in coolant thru.|Y
01|221378|7|1|This is the updated Item # for C5016-0750-4.00|Y
01|221379|1|1|P/N: HSK80C-C1.1/4-110G|Y
01|221379|1|2|HSK80C taper 1.1/4 Milling Chuck Hi-speed|Y
01|221379|1|3|110mm gauge length|Y
01|221386|1|1|To be modified with DIN coolant.|Y
01|221393|2|1|Please Note: IMTS promotion 10% has been added to the|Y
01|221393|2|2|discount on this quote. Thank you!|Y
01|221413|1|1|1st Batch 6/6/24:DWG APRVED/BTMFG(9/B)>8/30UPD8/26>ESD|Y
01|221413|2|1|1st Batch/for stock  5/16 approved|Y
01|221413|3|1|T/P Inspection Required|N
01|221413|4|1|1st batch/T/P Inspection Required|N
01|221413|5|1|1st Batch|Y
01|221415|1|1|P/N: TBD  BT40 Shrink fit holder w 35mm ID bore and|Y
01|221415|1|2|75mm gauge length without coolant ports|Y
01|221418|1|1|No inspection required.|Y
01|221418|2|1|No inspection required.|Y
01|221424|1|1|Final Part# Pending|Y
01|221424|1|2|Mimatic Part# 164420|Y
01|221424|1|3|**Quoted at NET Price**|Y
01|221424|2|1|Final Part#: Pending|Y
01|221424|2|2|Mimatic Part#: 163704|Y
01|221424|2|3|**Quoted at NET Price**|Y
01|221455|15|1|Req INS>slot widths to be undersize according to the DI|Y
01|221464|1|1|LN part# TBD|Y
01|221464|1|2|Mimatic Drawing# 192133|Y
01|221464|1|3|CAT50 ER25 Angle Head Twin Spindle|Y
01|221464|1|4|External Coolant|Y
01|221464|1|5|1:1 Gear  Max 8000|Y
01|221464|3|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|221464|3|2|of spindle drawing information|Y
01|221464|3|3|*net price|Y
01|221465|2|1|Please note additional 5% discount added per IMTS promo|Y
01|221466|9|1|Cover 5/32|Y
01|221466|16|1|Cover 1/16|Y
01|221466|17|1|1/32|Y
01|221475|1|1|To be installed w/ PS-132 @ Factory|Y
01|221475|2|1|To be installed w/ BT30-TB40-150 @ Factory|Y
01|221475|2|2|*Must be present on PO as separate line item from|Y
01|221475|2|3|BT30-TB40-150 if ordered|Y
01|221509|7|1|Please Note: IMTS24 promotion 10% extra has been added|Y
01|221509|7|2|to the discount. If quantities should change please|Y
01|221509|7|3|re-submit for quote.|Y
01|221518|1|1|Consignment Unit (Detroit MI)|Y
01|221518|1|2|Discounted ineligible for IMTS promo|Y
01|221537|1|1|Additional 20% Overstock Promotion discount applied.|Y
01|221537|1|2|Please note this item cannot be cancelled or returned|Y
01|221537|1|3|once a PO is placed.|Y
01|221537|2|1|Applied only to MBT40-C1.1/4-120G|Y
01|221549|1|1|Delivery:|Y
01|221549|1|2|1 Pc: 3-4 Days|Y
01|221549|1|3|2-3 Pcs: 3 Weeks|Y
01|221549|1|4|4 Pc: 5 Weeks|Y
01|221552|2|1|Please note: This is special non standard stock.|Y
01|221552|2|2|Once a PO is placed it cannot be cancelled or returned|Y
01|221554|3|1|price matched Koma|N
01|221580|4|1|Installation includes: Drive unit short bar fiber|Y
01|221580|4|2|optic cable communications cable bulkhead cables|Y
01|221580|4|3|external cables service time and travel.|Y
01|221582|8|1|FREE $1500 TOOL CERT INCLUDED WITH PURCHASE OF|Y
01|221582|8|2|A PRE-E46CA-I40.|Y
01|221597|2|1|Additional 10% applied to above live tool for 2024|Y
01|221597|2|2|IMTS Live & Static Tool Promotion.|Y
01|221603|1|1|C6-PCMNN-00115-12CP|Y
01|221603|1|2|Capto C6 Polygonal Turning Tool - External lever-lock|Y
01|221603|1|3|clamp|Y
01|221605|5|1|PRESETTER INSTALLATION & TRAINING ONLY|Y
01|221605|12|1|INSTALLATION & TRAINING FOR 1 TID INSTALLATION.|Y
01|221605|12|2|INSTALLATION MUST BE DONE AT THE SAME TIME AS|Y
01|221605|12|3|PRESETTER TRAINING.|Y
01|221613|2|1|HFO  Midwest to supply Yaskawa Sigma 7 motors.|Y
01|221613|2|2|Motors to be shipped to Mundelein for assembly|Y
01|221613|2|3|HFO responsible for field installation|Y
01|221616|1|1|Part Number TBD >> PSC5 Female to CAT50 Male Adapter|Y
01|221616|1|2|Quoted at NET price for 1~4 tools.|Y
01|221616|2|1|Part Number TBD >> PSC5 Female to CAT50 Male Adapter|Y
01|221616|2|2|Quoted at NET price for 5~10 tools.|Y
01|221619|1|1|Part Number: MZMP46-ER25Z-ICE|Y
01|221619|1|2|Mazak VDI40 Live ER25 Z<Axial>90D IntExtCool7MP 6.5K|Y
01|221619|1|3|CH115 - Same Delivery for 1&2 Pcs|Y
01|221624|1|1|CAT50 AGH; TWIN CAPTO C5; 3 PINS SUPPORT;|Y
01|221624|1|2|A=110mm/ d=28mm; L=686mm;|Y
01|221624|1|3|1:1 GEAR MAX 150Nm; 2000RPM;|Y
01|221624|1|4|REF DRWG # 00063703|Y
01|221648|3|1|Additional 5% applied to this holder for the 2024 IMTS|Y
01|221648|3|2|promotion.|Y
01|221678|1|1|**If ordered by tomorrow (9/20) can bring in by 11/18|Y
01|221686|1|1|REPLACEMENT FOR SN: 8707|Y
01|221686|1|2|INCLUDES TABLE + ROTARY JOINT|Y
01|221686|1|3|SHIPPING METHODS - INCLUDED - BOAT - 4-6 WEEKS|Y
01|221686|1|4|AIR FREIGHT - ADDITIONAL CHARGE|Y
01|221688|1|1|REPLACEMENT FOR SN: 8707|Y
01|221688|1|2|INCLUDES TABLE + ROTARY JOINT|Y
01|221688|1|3|SHIPPING METHODS - INCLUDED - BOAT - 4-6 WEEKS|Y
01|221688|1|4|AIR FREIGHT - ADDITIONAL CHARGE|Y
01|221695|5|1|Additional 10% IMTS Live/Static Tool Promo discount|Y
01|221695|5|2|applied only to items on Lines 1-4.|Y
01|221699|2|1|Additional 10% applied for the 2024 IMTS Live & Static|Y
01|221699|2|2|Tool Promotion for over $5000 List.|Y
01|221723|1|1|***Description is wrong.  This is a two table set***|Y
01|221726|1|1|HSK63F-SK13-70P|Y
01|221726|1|2|*Makino pins not supplied*|Y
01|221727|1|1|Service call for E460N s/n:6551|Y
01|221727|1|2|This is a time based estimate.|Y
01|221727|1|3|Any parts that would be required would be additional.|Y
01|221748|1|1|Includes 9+1 rotary union and T-slotted Face Plate|Y
01|221748|1|2|external cables.|Y
01|221794|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|221794|4|1|RT Install - Does not include 4th/5th interface|Y
01|221794|4|2|The Machine would need to have the factory 4th/5th|Y
01|221794|4|3|Interface and 3rd Party Rotary Option|Y
01|221794|4|4|Price includes - Travel & Labor|Y
01|221804|4|1|BT40-SF4-75MT|Y
01|221804|4|2|Shrink Fit Holder 4mm Mold Type|Y
01|221804|4|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|5|1|BT40-SF6-75MT|Y
01|221804|5|2|Shrink Fit Holder 6mm Mold Type|Y
01|221804|5|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|6|1|BT40-SF8-75MT|Y
01|221804|6|2|Shrink Fit Holder 8mm Mold Type|Y
01|221804|6|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|7|1|BT40-SF10-75MT|Y
01|221804|7|2|Shrink Fit Holder 10mm Mold Type|Y
01|221804|7|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|7|4|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|8|1|H63F-SF4-75MT|Y
01|221804|8|2|Shrink Fit Holder 4mm Mold Type|Y
01|221804|8|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|9|1|H63F-SF4-90MT|Y
01|221804|9|2|Shrink Fit Holder 4mm Mold Type|Y
01|221804|9|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|10|1|H63F-SF4-150MT|Y
01|221804|10|2|Shrink Fit Holder 4mm Mold Type|Y
01|221804|10|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|11|1|H63F-SF4-120mt|Y
01|221804|11|2|Shrink Fit Holder 4mm Mold Type|Y
01|221804|11|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|12|1|H63F-SF6-75MT|Y
01|221804|12|2|Shrink Fit Holder 6mm Mold Type|Y
01|221804|12|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|13|1|H63F-SF6-180MT|Y
01|221804|13|2|Shrink Fit Holder 6mm Mold Type|Y
01|221804|13|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|14|1|H63F-SF6-90MT|Y
01|221804|14|2|Shrink Fit Holder 6mm Mold Type|Y
01|221804|14|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|15|1|H63F-SF6-150MT|Y
01|221804|15|2|Shrink Fit Holder 6mm Mold Type|Y
01|221804|15|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|16|1|H63F-SF8-75MT|Y
01|221804|16|2|Shrink Fit Holder 8mm Mold Type|Y
01|221804|16|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|17|1|H63F-SF8-90MT|Y
01|221804|17|2|Shrink Fit Holder 8mm Mold Type|Y
01|221804|17|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|18|1|H63F-SF8-150MT|Y
01|221804|18|2|Shrink Fit Holder 8mm Mold Type|Y
01|221804|18|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|19|1|H63F-SF10-75MT|Y
01|221804|19|2|Shrink Fit Holder 10mm Mold Type|Y
01|221804|19|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|20|1|H63F-SF10-90MT|Y
01|221804|20|2|Shrink Fit Holder 10mm Mold Type|Y
01|221804|20|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221804|21|1|H63F-SF10-150MT|Y
01|221804|21|2|Shrink Fit Holder 10mm Mold Type|Y
01|221804|21|3|Manufacturing 8 weeks upon approval drawing + shipping|Y
01|221812|1|1|4000Kg capacity 425mm depth|Y
01|221812|1|2|Installation required|Y
01|221812|1|3|Cable management not included.  Standard control cables|Y
01|221812|1|4|w/ seal tight flexible conduit to connect at joint box.|Y
01|221812|1|5|joint box located at machine base fixed location|Y
01|221812|1|6|Software and control options may be required from...|Y
01|221812|1|7|...machine tool builder.  These are not included|Y
01|221812|1|8|within the scope of this quote.|Y
01|221812|4|1|Terms:  20% down Remainder NET30 upon completion|Y
01|221812|4|2|Financing Available|Y
01|221817|1|1|RGA#LVR-61168/|Y
01|221817|1|2|Repair of MZQT47-ER32Z-MS-OFFC-3MP s/n:45128 03|Y
01|221817|1|3|(Mimatic#167955)|Y
01|221817|2|1|Bearings seals and O-rings to be replaced.|Y
01|221819|1|1|Additional 5% IMTS Promo discount applied.|Y
01|221819|2|1|Applied only to CAT40-MMC4-90U-IDU|Y
01|221824|2|1|Please note additional 20% discount per overstock promo|Y
01|221824|2|2|has been added once PO and order has been issued this|Y
01|221824|2|3|can't be returned or cancelled|Y
01|221826|1|1|RGA#LVR-61189/|Y
01|221826|1|2|Repair of MZQT47-ER32X-OFF-ICE s/n:19907807 02|Y
01|221826|1|3|(Mimatic#124259)|Y
01|221826|2|1|Bearings seals and o-rings to be replaced.|Y
01|221829|1|1|Additional 5% IMTS promo discount applied.|Y
01|221829|6|1|Applied only to CAT40-SK16-90U-IDU|Y
01|221829|6|2|Valid until 11/30|Y
01|221830|1|1|Additional 10% IMTS Promo discount applied.|Y
01|221830|4|1|Additional 10% IMTS promo discount applied.|Y
01|221830|7|1|Applied only to BMT65-SK20X-ICE BMT65-SK20Z-ICE|Y
01|221830|7|2|Valid until 11/30|Y
01|221833|1|1|This is priced without the 5C collet nose piece per|Y
01|221833|1|2|customer's request.  The drawbar will be threaded to|Y
01|221833|1|3|accept 5C collet threads still and customer will be|Y
01|221833|1|4|responsible for adapting those drawbar threads to the|Y
01|221833|1|5|workholding they intend to use.|Y
01|221839|2|1|1-2 WEEKS DELIVERY FROM FACTORY STOCK|Y
01|221843|7|1|Additional 10% discount given for holders on lines|Y
01|221843|7|2|1-6 for the IMTS Promotion for List over $5000 (total|Y
01|221843|7|3|is $5634).  This represents a complete order. Should|Y
01|221843|7|4|the List fall below $5000 then only an additional 5%|Y
01|221843|7|5|would be applied to these holders.|Y
01|221847|1|1|**Quoted at NET Price** Final Part# MZST80-ER25-AD-ICE|Y
01|221847|1|2|Please note: This is special non-standard stock.|Y
01|221847|1|3|Once a PO is placed this item cannot be cancelled or|Y
01|221847|1|4|returned.|Y
01|221847|1|5|.|Y
01|221847|1|6|DELIVERY: 1 piece 2-3 Wks ARO. Balance ~8 Weeks ARO.|Y
01|221847|1|7|.|Y
01|221847|1|8|Description: Mazak BMT80 LIve ER25 STRT Adjustable|Y
01|221847|1|9|IntCoolant7MP|Y
01|221853|1|1|Additional 5% IMTS Promo discount applied.|Y
01|221853|4|1|Applied only to MZQT47-ER32X-OFF-ICE|Y
01|221853|4|2|Valid until 11/30 for drop-ship orders only.|Y
01|221855|2|1|Additional 5% discount applied to this holder for our|Y
01|221855|2|2|2024 IMTS Promotion.|Y
01|221873|1|1|Delivery: Our vendor has 5 in stock. Our air cutoff|Y
01|221873|1|2|is 09/25 for delivery to L-N mid October. Otherwise|Y
01|221873|1|3|the next delivery would be mid Nov.|Y
01|221874|5|1|FREE TOOLING CERTIFICATE WITH PURCHASE OF E346+|Y
01|221875|3|1|FREE TOOLING CERTIFICATE WITH PURCHASE OF E346+|Y
01|221879|1|1|Currently 2 in stock in IL 1 other at the factory &|Y
01|221879|1|2|delivery is approximately 2~3 Weeks.  Delivery for|Y
01|221879|1|3|other 4 is 4~5 weeks.|Y
01|221879|2|1|Additional 10% discount added for the 2024 IMTS|Y
01|221879|2|2|promotion for spending over $5000 list.  If List|Y
01|221879|2|3|amount drops between $500-$5000 then we will only|Y
01|221879|2|4|apply a 5% (additional discount - see promotional flyer|Y
01|221879|2|5|in quote email.|Y
01|221882|1|1|Part # BMT65-ER32X-OFF-HS2|Y
01|221882|1|2|Reference Mimatic # 195807|Y
01|221883|11|1|Additional 10% IMTS Promo discount applied to above|Y
01|221883|11|2|live/static tools. For drop-ship orders only valid|Y
01|221883|11|3|until 11/30/24.|Y
01|221884|1|1|Includes 9+1 Rotary union and cable set.|Y
01|221888|1|1|Part# S32-ZMACX42-275V|Y
01|221888|1|2|Straight Shank Deep Hole ZMACX advanced boring bar.|Y
01|221888|1|3|Boring Range: 41.8~55.2 / Boring Depth 205~275|Y
01|221893|1|1|5AX-350FA-RJ6 SN 3514|Y
01|221893|1|2|RGA TAR-61184|Y
01|221893|35|1|RE-GRIND ROTARY AXIS FACEPLATE|Y
01|221893|35|2|FOR FACE SEAL CONTACT - BACKSIDE SURFACE WORN|Y
01|221893|36|1|CHROME/REGRIND ROTARY AXIS JOINT SHAFT|Y
01|221893|37|1|RE-GRIND TILT AXIS ROTARY JOINT SHAFT|Y
01|221901|2|1|Tapholder HSK50C Compresion/tension #1|Y
01|221901|2|2|152.05.052.001|Y
01|221901|3|1|Tapholder HSK50C Compresion/tension #2|Y
01|221901|3|2|152.05.052.002|Y
01|221908|2|1|Installation includes: Drive unit short bar fiber|Y
01|221908|2|2|optic cable communications cable bulkhead cables|Y
01|221908|2|3|external cables parameter changes service time and|Y
01|221908|2|4|travel.|Y
01|221928|1|1|Service call for Sethy Six s/n:6174|Y
01|221928|1|2|This is a time based estimate.|Y
01|221928|1|3|Any parts that would be required would be additional.|Y
01|221957|1|1|Machine Tool must have the 4th and 5th axis interface|Y
01|221957|1|2|installed to the machine bulkhead.The Nikken table will|Y
01|221957|1|3|include cables from the rotary to the machine bulkhead|Y
01|221957|1|4|The machines will also need to have the 3rd party|Y
01|221957|1|5|software option|Y
01|221968|1|1|AUTOMATED TOOL STORAGE/VENDING MACHINE|Y
01|221968|1|2|SEE BROCHURE ATTACHED TO EMAIL.|Y
01|221970|2|1|RNC 8380 +/- 2 Big Bore Scale with Mounting Kit|Y
01|221970|3|1|NT50 Taper Center Socket|Y
01|221970|4|1|Hydraulic Cylinder and Adapter for NT50 Socket|Y
01|221970|5|1|Power and Signal/Feedback Cable Set|Y
01|221970|6|1|Manual Lever Valve for Tailstock 2000 PSI|Y
01|221970|7|1|Hydraulic Hose Set|Y
01|221970|8|1|Special Hydraulic Tailstock per Customer|Y
01|221970|8|2|Drawing 500152-T-1SHT1 Rev Level B|Y
01|221970|9|1|Onsite Technican to facilitate Tailstock and|Y
01|221970|9|2|Rotary table setup.|Y
01|221971|1|1|Part# TBD Nakamura live Fixed Angle Head 95 BMT55|Y
01|221971|1|2|Shank size: 75/104mmDihedral-drive size: SW = 8 mm|Y
01|221971|1|3|Tooling Interface:ER20 (0.5-13.0mm) according to|Y
01|221971|1|4|DIN 6499Internal coolant through the spindle. External|Y
01|221971|1|5|coolant over pipes filtration grade: max.0.05 mm|Y
01|221971|1|6|Continuous dryrun possible with sufficient cooling|Y
01|221971|1|7|phase.Maximum temperature: 90C (194F). No reversal|Y
01|221971|1|8|of rotation direction.Length(L):130mm Gear Ratio:|Y
01|221971|1|9|i(n1/n2) = 1:1 Maximum torque: 30 Nm Maximum|Y
01|221971|1|10|revolution speed:9000rpm weight approx.9kg.|Y
01|221971|2|1|Net price quote for 3 tools.|Y
01|221973|2|1|RNC 8381 +/- 2 Big Bore Scale with Mounting Kit|Y
01|221973|3|1|NT50 Taper Center Socket|Y
01|221973|4|1|Hydraulic Cylinder and Adapter for NT50 Socket|Y
01|221973|5|1|Power and Signal/Feedback Cable Set|Y
01|221973|7|1|Hydraulic Hose Set|Y
01|221973|8|1|Special Hydraulic Tailstock per Customer|Y
01|221973|8|2|Drawing 500152-T-1SHT1 Rev Level B|Y
01|221977|1|1|Part# TBDNakamura live Fixed Angle Head 95 BMT65|Y
01|221977|1|2|Shank size: 83/112mmDihedral-drive size: SW = 10 mm|Y
01|221977|1|3|Tooling interface: ER20 (0.5-13.0mm) according to|Y
01|221977|1|4|DIN 6499Internal coolant through the spindle.External|Y
01|221977|1|5|coolant over pipes filtration grade: max 0.05mm.|Y
01|221977|1|6|Continuous dryrun possible with sufficient cooling|Y
01|221977|1|7|phase.Maximum temperature: 90C (194F).No reversal of|Y
01|221977|1|8|rotation direction.Length (L): 130mm Gear ratio:|Y
01|221977|1|9|i(n1/n2) = 1:1Maximum torque: 30 NmMaximum|Y
01|221977|1|10|revolution speed:9000rpmWeight:approx. 9kg.|Y
01|221978|1|1|5% IMTS additional discount promo.|Y
01|221978|1|2|Includes cable sets.|Y
01|221979|1|1|M560-5AX S/N 667.254685|Y
01|221979|1|2|Milling TC|Y
01|221989|1|1|RGA#CUR-60947/|Y
01|221989|1|2|Repair of C40RA-0025M s/n:18902340 14 (Mimatic#175241)|Y
01|221989|2|1|Bearings seals and o-rings to be replaced|Y
01|221990|1|1|Please note additional 20% discount has been applied|Y
01|221990|1|2|with overstock promo. Once PO or order has been placed|Y
01|221990|1|3|these cannot be cancelled or returned.|Y
01|222001|1|1|**QTY BREAK NET PRICING**|Y
01|222001|1|2|1pc $16200.00ea/net|Y
01|222001|1|3|2pc+ $11600.00ea/net|Y
01|222001|5|1|Mazak VDI50 Live ER32 Z<Axial>90D IntCool7MP|Y
01|222001|5|2|**QTY BREAK NET PRICING**|Y
01|222001|5|3|1pc $18100.00ea/net|Y
01|222001|5|4|2pc+ $12800.00ea/net|Y
01|222001|5|5|Delivery: expect 4wks for design time upon receipt of|Y
01|222001|5|6|PO. Additional 14wks for manufacturing and shipping|Y
01|222001|5|7|after approved drawing.|Y
01|222012|1|1|NBT50-Z38-175 Taper Plus BT50 Tap Holder|Y
01|222012|2|1|NBT50-ZL38-150  Taper Plus BT50 Tap Holder|Y
01|222015|1|1|Angle Unit i=1:1 VDI 50 Mazak CT-4500 MI-63 IC|Y
01|222015|1|2|90Degree Angle Version|Y
01|222015|1|3|Delivery: 2 Weeks Design 14 Weeks After Signed Drawing|Y
01|222015|1|4|Approval|Y
01|222015|2|1|Angle Unit i=1:1 VDI 50 Mazak CT-4500 MI-63 IC|Y
01|222015|2|2|90Degree Angle Version|Y
01|222015|2|3|Delivery: 2 Weeks Design 14 Weeks After Signed Drawing|Y
01|222015|2|4|Approval|Y
01|222015|3|1|Winkel Borh-/Frashalter i=1:1 50 Mazak CT4500 C5|Y
01|222015|3|2|90Degree Angle Version|Y
01|222015|3|3|Delivery: 2 Weeks Design 14 Weeks After Signed Drawing|Y
01|222015|3|4|Approval|Y
01|222015|4|1|Winkel Borh-/Frashalter i=1:1 50 Mazak CT4500 C5|Y
01|222015|4|2|90Degree Angle Version|Y
01|222015|4|3|Delivery: 2 Weeks Design 14 Weeks After Signed Drawing|Y
01|222015|4|4|Approval|Y
01|222015|6|1|Gerader Bohr-/Frashalter i=1:150  Mazak CT4500 C5|Y
01|222015|6|2|Delivery: 2 Weeks Design 14 Weeks After Signed Drawing|Y
01|222015|6|3|Approval|Y
01|222015|7|1|Gerader Bohr-/Frashalter i=1:1 50  Mazak CT4500 C5|Y
01|222015|7|3|Delivery: 2 Weeks Design 14 Weeks After Signed Drawing|Y
01|222015|7|4|Approval|Y
01|222015|8|1|Straight Unit i=1:1 VDI50 Mazak CT4500 MI-63 IC|Y
01|222015|8|2|Delivery: 2 Weeks Design 14 Weeks After Signed Drawing|Y
01|222015|8|3|Approval|Y
01|222015|9|1|Straight Unit i=1:1 VDI50 Mazak CT4500 MI-63 IC|Y
01|222015|9|2|Delivery: 2 Weeks Design 14 Weeks After Signed Drawing|Y
01|222015|9|3|Approval|Y
01|222015|10|1|MI63 ER32 Collet Chuck Short Type No Wrench|Y
01|222015|11|1|MI63 ER40 Collet Chuck Short Type No Wrench|Y
01|222024|2|1|Minimun order quantity 5 pcs net price for Afilados|Y
01|222024|4|1|Minimun order quantity 5 pcs net price for Afilados|Y
01|222024|6|1|Minimun order quantity 5 pcs net price for Afilados|Y
01|222024|7|1|Minimun order quantity 5 pcs net price for Afilados|Y
01|222024|8|1|Minimun order quantity 5 pcs net price for Afilados|Y
01|222028|3|1|(1) ADAPTER PLATE TO MOUNT TO T-SLOTS ON ROTARY TABLE|Y
01|222028|3|2|(1) CHUCK PLATE FOR MOUNTING SCHUNK TPS125-26/Z|Y
01|222028|3|3|SELF CONTAINED 3-JAW AIR CHUCK|Y
01|222033|5|1|A tariff surcharge of 8% will be added to every order|Y
01|222033|5|2|placed after September 1st 2025(until further notice).|Y
01|222033|5|3|This surcharge will be acknowledged upon acceptance|Y
01|222033|5|4|of every order.|Y
01|222041|3|1|ADAPTER PLATE FOR SCHUNK KSP160 AIR VISE|Y
01|222045|1|1|Angle Head Type ZW Size 9:|Y
01|222045|1|2|Shaft: HSK100(DIN 69893-A) Standard-Torque-Arm(ISO9524)|Y
01|222045|1|3|with locking mechanism (no stop block)|Y
01|222045|1|4|Requires customer-size adjustment; recommend 3-pin|Y
01|222045|1|5|support. A=80mm/D=20mm/SW18 Tooling: MI-63 Quick Change|Y
01|222045|1|6|System (MI-Insert sold separately) Coolant: Central|Y
01|222045|1|7|Thru-Spindle External via nozzles/pipes. No reversal|Y
01|222045|1|8|of rotation. Length: L=270mm/L1=152mm. Angular Head:|Y
01|222045|1|9|360 Degrees Adjustable. Gear Ratio: 1:1. Max Coolant|Y
01|222045|1|10|Pressure: 70 Bar Max Torque: 150Nm Max Rev Speed:5K rpm|Y
01|222051|1|1|CAT40 AGH; Slim type ER11|Y
01|222051|1|2|No coolant - A=5mm; L=286mm; 1:1 67 Gear Max 6Nm;|Y
01|222051|1|3|Max output 12K RPM|Y
01|222068|4|1|NOTE:  COOLANT PORTS ARE NOT AVAILABLE - LENGTH TOO|Y
01|222068|4|2|SHORT.|Y
01|222068|14|1|NOTE: We do not have a 1.0 Arbor so we have quoted as|Y
01|222068|14|2|close as we can.|Y
01|222069|3|1|(1) ADAPTER PLATE TO MOUNT TO T-SLOTS ON ROTARY TABLE|Y
01|222069|3|2|(1) CHUCK PLATE FOR MOUNTING SCHUNK TPS125-26/Z|Y
01|222069|3|3|SELF CONTAINED 3-JAW AIR CHUCK|Y
01|222072|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|222074|1|1|R-7-SP-CHUCK|Y
01|222074|1|2|CHUCK ONLY - NO ADAPTER PLATE|Y
01|222076|2|1|IMTS promo 5% has been added to the discount.|Y
01|222082|17|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|222082|17|2|of spindle drawing information|Y
01|222082|17|3|*net price|Y
01|222083|6|1|TOOLING CERTIFICATE FOR $1000 WITH THE PURCHASE|Y
01|222083|6|2|OF THIS PRESETTER PRIOR TO 11/30/24. MUST BE|Y
01|222083|6|3|DROP SHIPPED TO END USER.|Y
01|222085|1|1|Part Number to Be Determined|Y
01|222085|1|2|DU LIVE VDI40; ER40L 90DEG RIGHT HAND;EXTERNAL COOLANT|Y
01|222085|1|3|1:1 GEAR ; 6500 RPM; 80Nm|Y
01|222088|1|1|If more than 2 pcs are ordered ETA of 12/2|Y
01|222089|5|1|Additional 10% discount applied for the 2024 IMTS|Y
01|222089|5|2|promotion for spending over $5000 List.  If List|Y
01|222089|5|3|amount drops between $500-$5000 then we will only|Y
01|222089|5|4|apply a 5% (additional discount).|Y
01|222091|2|1|Includes: Dual axis drive unit short bar fiber optic|Y
01|222091|2|2|cables communications cables bulkhead cables|Y
01|222091|2|3|external cables parameter changes service time and|Y
01|222091|2|4|travel.|Y
01|222093|1|1|Part Number TBD|Y
01|222093|1|2|CAT50 AGH; TWIN CAPTO C5;|Y
01|222093|1|3|Special flange mount design to go over spindle|Y
01|222093|1|4|liner/Guide.1:1 GEAR MAX 150Nm; 2000RPM;|Y
01|222095|1|1|C5006-8-2.50  *Quoted at NET Price*|Y
01|222095|1|2|Cat50 8mm Endmill holder G/L 2.5|Y
01|222095|1|3|QTY BREAK NET PRICING:|Y
01|222095|1|4|1-9 pcs: $276.00 ea|Y
01|222095|1|5|10+ pcs: $184.00 ea|Y
01|222095|1|6|.|Y
01|222095|1|7|Delivery: ~20-22 wks after design approval drawing is|Y
01|222095|1|8|signed by the customer.|Y
01|222095|1|9|PLEASE NOTE: Once a PO is placed this item cannot be|Y
01|222095|1|10|cancelled or returned.|Y
01|222101|2|1|Please note additional 5% applied with IMTS promotions.|Y
01|222113|1|1|CNC202LFA SN: 26502TCN|Y
01|222113|1|2|RGA#TAR-61201|Y
01|222127|1|1|No inspection required.|Y
01|222137|1|1|Net Price for Distribuidora Paula|Y
01|222137|1|2|Price only valid for 37 pcs|Y
01|222139|1|1|Service call for E46LA s/n:TBD|Y
01|222139|1|2|This is a time based estimate.|Y
01|222139|1|3|Any parts that would be required would be additional.|Y
01|222150|3|1|Additional 5% discount applied to above holder for the|Y
01|222150|3|2|2024 IMTS Promotion for List being over $500|Y
01|222151|2|1|Additional 5% discount applied to above holder for the|Y
01|222151|2|2|2024 IMTS Promotion for Advanced Toolholders.|Y
01|222152|4|1|Quoted at NET price / This item is special and once|Y
01|222152|4|2|a purchase order is placed it cannot be cancelled|Y
01|222152|4|3|or returned.|Y
01|222158|1|1|Final Part# TBD  **Quoted at NET price**|Y
01|222158|1|2|QTY BREAK NET Pricing:|Y
01|222158|1|3|1 pc - $12409|Y
01|222158|1|4|2+ pcs - $11031|Y
01|222158|1|5|.|Y
01|222158|1|6|Delivery: 3 Weeks design time. After approval drawing|Y
01|222158|1|7|is signed please allow for 12-14 weeks manufacturing|Y
01|222158|1|8|and shipping.|Y
01|222158|1|9|This item cannot be cancelled or returned upon receipt|Y
01|222158|1|10|of PO.|Y
01|222158|19|1|Final Part# TBD **Quoted at NET price**|Y
01|222158|19|2|QTY BREAK NET Pricing:|Y
01|222158|19|3|1 pc - $14509|Y
01|222158|19|4|2+ pcs - $13130|Y
01|222158|19|5|.|Y
01|222158|19|6|Delivery: 3 Weeks design time. After approval drawing|Y
01|222158|19|7|is signed please allow for 12-14 weeks manufacturing|Y
01|222158|19|8|and shipping.|Y
01|222158|19|9|This item cannot be cancelled or returned upon receipt|Y
01|222158|19|10|of PO.|Y
01|222158|37|1|Quoted at NET Price. Lyndex-Nikken to make block after|Y
01|222158|37|2|receipt of spindle measurements. This item is special|Y
01|222158|37|3|and cannot be cancelled or returned after receipt of PO|Y
01|222159|5|1|8 HOURS PRESETTER SETUP AND TRAINING|Y
01|222159|5|2|INCLUDED AT NO COST TO ITS OR QUINCY COMPRESSORS|Y
01|222159|6|1|$1000 FREE TOOLING CERTIFICATE IMTS PROMOTION|Y
01|222163|1|1|Minimun order quantity 3 pcs net price for Afilados|Y
01|222163|3|1|Minimun order quantity 3 pcs net price for Afilados|Y
01|222163|5|1|Minimun order quantity 3 pcs net price for Afilados|Y
01|222163|7|1|Minimun order quantity 3 pcs net price for Afilados|Y
01|222167|2|1|IMTS PROMO EXTRA 5%|Y
01|222168|6|1|TOOLING CERTIFICATE FOR $1000 WITH THE PURCHASE|Y
01|222168|6|2|OF THIS PRESETTER PRIOR TO 11/30/24. MUST BE|Y
01|222168|6|3|DROP SHIPPED TO END USER.|Y
01|222170|3|1|Quoted at NET Price. This item is special and cannot|Y
01|222170|3|2|be cancelled or returned after receipt of PO.|Y
01|222172|8|1|Promo Expires 11/30/2024|Y
01|222173|5|1|TOOLING CERTIFICATE FOR $750 WITH THE PURCHASE|Y
01|222173|5|2|OF THIS PRESETTER PRIOR TO 11/30/24. MUST BE|Y
01|222173|5|3|DROP SHIPPED TO END USER.CAN ONLY BE USED ON|Y
01|222173|5|4|TOOLHOLDERS!|Y
01|222173|11|1|TOOLING CERTIFICATE FOR $2000 WITH THE PURCHASE|Y
01|222173|11|2|OF THIS PRESETTER PRIOR TO 11/30/24. MUST BE|Y
01|222173|11|3|DROP SHIPPED TO END USER.|Y
01|222177|13|1|NOTE: C40-4500(H)-EU was discontinued due to thin|Y
01|222177|13|2|flange.  Drawing attached to quote for C40S-4500(H)-EU.|Y
01|222178|10|1|This tool does not come in Dual Contact / Taper Plus.|Y
01|222178|29|1|This collet does not come with coolant thru.|Y
01|222178|33|1|NCAT40 DualContact ER32 Collet Chuck Smooth Bearing Nut|Y
01|222178|33|2|Chip Hole w/1.10 Gage Length|Y
01|222184|1|1|Includes: Table with motors 9+1 Rotary joint cable|Y
01|222184|1|2|sets for tilt and rotary axis hole pattern face plate|Y
01|222184|1|3|tilt axis mechanical brake and motor with brake no|Y
01|222184|1|4|rotary axis brake on the table.|Y
01|222184|1|5|Delivery 2-3 months after signed approval drawings|Y
01|222184|2|1|Price break for 6pcs order|Y
01|222189|2|1|Please note additional 5% discount added per IMTS promo|Y
01|222190|2|1|Please note additional 5% discount added per IMTS promo|Y
01|222190|4|1|Please note additional 5% discount added per IMTS promo|Y
01|222191|1|1|Delivery: 8 tools in stock / 32-pcs 3~4 weeks/|Y
01|222191|1|2|40-pcs 15 weeks ARO|Y
01|222198|1|1|5AX-201FA-M SN:5701|Y
01|222198|1|2|RGA#TAR-61138|Y
01|222200|1|1|5AX-2MT-225-OPS3M SN:2183|Y
01|222200|38|1|R-Axis Motor Cover|Y
01|222204|1|1|Additional 5% IMTS Promo discount applied.|Y
01|222204|1|2|e|N
01|222204|2|1|Applicable only to CAT50-SK10-195U-IDU|Y
01|222206|1|1|Discount reflects a purchase order of 1~2 pre-setters.|Y
01|222206|2|1|Discount reflects a purchase order of 3~4 pre-setters.|Y
01|222206|3|1|Discount reflects a purchase order of 4+ pre-setters.|Y
01|222216|1|1|Non returnable once drawscrew is threaded.|Y
01|222216|2|1|LN to thread blank drawscrew to match customer machine|Y
01|222216|2|2|drawtube. Lead time is 3-5 days after receipt of|Y
01|222216|2|3|customer specs.|Y
01|222235|1|1|CAT50 TAPER TO MT6 OUTPUT GL 9.80|Y
01|222235|1|2|Part #: C5004-0006-9.80|Y
01|222235|1|3|Quote at NET price for Quantity of 2.|Y
01|222251|2|1|Final Part#: HSK63T-180-TH25R-115|Y
01|222251|2|2|HSK63T Turning Tool Square Right|Y
01|222251|4|1|Final Part#: HSK63T-180-TH25.4L-115|Y
01|222251|4|2|HSK63T Turning Tool Square Left 1 square shank|Y
01|222251|4|3|.|Y
01|222251|4|4|QTY BREAK NET PRICING|Y
01|222251|4|5|1-9 pcs: $2096/ea|Y
01|222251|4|6|10+ pcs: $1858/ea|Y
01|222251|5|1|Final Part#: HSK63T-180-TH25.4R-115|Y
01|222251|5|2|HSK63T Turning Tool Square Right 1 square shank|Y
01|222251|5|3|.|Y
01|222251|5|4|QTY BREAK NET PRICING|Y
01|222251|5|5|1-9 pcs: $2096/ea|Y
01|222251|5|6|10+ pcs: $1858/ea|Y
01|222260|2|1|AIR/HYDRAULIC BOOSTER FOR ROTARY TABLE BRAKE|Y
01|222260|3|1|TAT/SUPPRT TABLE FOR TRUNNION ASSEMBLY|Y
01|222260|4|1|ROTARY JOINT FOR THRU CENTER HYDRAULICS/PNUEMATICS|Y
01|222260|5|1|WILL BE 15 WIDE BY 18 LONG|Y
01|222260|5|2|PART NUMBER WILL LIKELY BE:|Y
01|222260|5|3|-TRUNNION-STALLION-15/18|Y
01|222260|6|1|CUSTOM BASEPLATE FOR ROTARY/TAT/TRUNNION.|Y
01|222260|6|2|WILL BE KEYED TO MATCH THE TABLE.|Y
01|222260|6|3|PLATE WILL BE 1.25 THICK|Y
01|222263|6|1|IMTS Promotion 5% has been added to the discount.|Y
01|222263|6|2|If quantities change please re-submit for quote.|Y
01|222268|1|1|Replace TCE-96751|Y
01|222271|6|1|For Makino PS105 400v drives.|Y
01|222271|6|2|Data sheets required for order.|Y
01|222276|1|1|This item is special non-standard stock. Once a PO is|Y
01|222276|1|2|placed it cannot be cancelled or returned.|Y
01|222290|1|2|please confirm clearance in APC stocker|Y
01|222290|1|3|Fanuc data sheets required at time of order|Y
01|222290|1|4|Workholding and fixtures are optional|Y
01|222290|4|1|For Makino Slim3N.  Please specify voltage.|Y
01|222290|4|2|Application form required.|Y
01|222295|2|1|Additional 5% discount added to above holder for the|Y
01|222295|2|2|2024 IMTS Promotion.|Y
01|222297|1|1|Part#: ST25-SK13-D34-64-G|Y
01|222297|1|2|SK13 Straight Shank Extension (short)|Y
01|222297|1|3|Qty Breaks: (NET)|Y
01|222297|1|4|10+ Pcs: $400.38/EA|Y
01|222297|1|5|20+ Pcs: $371.43/EA|Y
01|222297|1|6|50+ Pcs: $360.00/EA|Y
01|222297|1|7|100+ Pcs: $350.00/EA|Y
01|222297|1|8|*Lead time given as ADA - After Signed Drawing Approval|Y
01|222297|2|1|Part number: SKG-15S-D5.5T|Y
01|222297|2|2|Adjustment screw for ST25-SK13-D34-64-G|Y
01|222297|2|3|*Lead time given as ADA - After Signed Drawing Approval|Y
01|222300|1|1|Quantity Breaks:|Y
01|222300|1|2|50+ Pcs: 40% Discount (NET: $25.80/EA)|Y
01|222300|1|3|75+ Pcs: 45% Discount (NET: $23.65/EA)|Y
01|222308|6|1|Part#: C6-T-DCM12DDM15-130CP  **quoted at NET price**|Y
01|222308|6|2|Delivery: Mid November if ordered in October|Y
01|222308|15|1|Additional 10% IMTS Promo discount applied to all items|Y
01|222308|15|2|except for:|Y
01|222308|15|3|W75R5-0562-1.46(C) 032-SPAN 020-SPAN|Y
01|222308|15|4|**Valid until 11/30/24 for drop-ship orders only**|Y
01|222311|1|1|NBT40 DualContact AngleHead Stryker Workpiece|Y
01|222311|1|2|2K->9.5K w/ Case|Y
01|222311|1|3|Mimatic # 186041|Y
01|222311|2|1|Special solid carbide thread-miller cutter for|Y
01|222311|2|2|UN-thread from 20 to 28/ Tinamatic-3 Special thread|Y
01|222311|2|3|milling cutter for 60 degree thread from Pitch 28/ up|Y
01|222311|2|4|to 28/ cutting diameter = 4.8mm - max. profile depth|Y
01|222311|2|5|Stt. = 0.8mm.  Cantilever length L1=3.45mm length from|Y
01|222311|2|6|top of tool spindle L=6.5mm shaft diameter = 3mm|Y
01|222311|2|7|(special style) according to MIMATIC drawing 00047159|Y
01|222311|2|8|carbide grade FKN/Tinamatic-3 coating.|Y
01|222313|4|1|Please Note: We ship the angle head and accessories|Y
01|222313|4|2|before the positioning block. Tim Reeves will work with|Y
01|222313|4|3|the customer to make the block after they receive the|Y
01|222313|4|4|angle head.|Y
01|222320|1|1|Additional 10% IMTS Promo discount applied.|Y
01|222320|4|1|Applied only to MZQT47-ER32Z-ICE. Valid until 11/30/24.|Y
01|222320|4|2|For Drop-Ship orders only.|Y
01|222325|1|1|PRESETTER HAS 22 OF Z TRAVEL|Y
01|222327|1|1|RGA#TOR-61214/|Y
01|222327|1|2|Repair of CAT40-C3/4-70U-IDU|Y
01|222328|1|1|THIS PRESETTER HAS 23.6 OF TRAVEL|Y
01|222330|2|1|ETA for remaining 4 pcs is: 1.5 Months.|Y
01|222343|9|1|Installation includes: Smart Hub and Autodoor mounting|Y
01|222343|9|2|of hardware and integration for two machines.|Y
01|222343|9|3|Integration of LN1813 cobot into one machine.|Y
01|222343|9|4|This covers travel time and on-site labor.|Y
01|222368|1|1|List Price = $688.00|Y
01|222368|2|1|List = $1553.00|Y
01|222368|3|1|List = $2494.00|Y
01|222372|3|1|Additional 5% promo discount has been added to the|Y
01|222372|3|2|standard discount.|Y
01|222386|2|1|IMTS Promotion 5% extra added to the discount on this|Y
01|222386|2|2|quote. Thank you!|Y
01|222392|1|1|delivery 8 - 12 wks upon PO|Y
01|222392|1|2|delivery (8-10weeks for Mnfg 2weeks for shipping)|Y
01|222392|1|3|not refundable not cancelable upon PO|Y
01|222399|3|1|Please note:IMTS promotion 5% extra added to the|Y
01|222399|3|2|discount on this quote.|Y
01|222402|2|1|Please note additional 5% discount added per IMTS promo|Y
01|222406|1|1|P/N: E16-008(S)  ER16 1/8 coolant collet C Type|Y
01|222406|2|1|P/N: E16-236(S)  ER16 6mm coolant collet C Type|Y
01|222407|2|1|IMTS24 promotion 10% has been added to the discount on|Y
01|222407|2|2|this quote.|Y
01|222417|2|1|Additional 20% overstock promotion discount applied.|Y
01|222417|2|2|Once a PO is placed this item cannot be cancelled|Y
01|222417|2|3|or returned.|Y
01|222421|3|1|SAME SPEC AS S/N 26502T W/O DIRECT CABLENO MOTOR|Y
01|222421|3|2|SPECIAL FACEPLATE INCLUDED|Y
01|222421|3|3|DELIVERY 6-8 WEEKS + SHIPPING FROM JAPAN|Y
01|222440|1|1|ROTARY TABLE CENTER HEIGHT 230MM|Y
01|222440|2|1|POLY WRAPPED EXTERNAL POWER/FEEDBACK CABLES FOR 4TH|Y
01|222440|2|2|AXIS. MADE TO LENGTH FOR OKUMA MILLAC 1052|Y
01|222440|7|1|CUSTOM Base plate keyed for okuma millac 1052v|Y
01|222441|2|1|POLY WRAPPED EXTERNAL POWER/FEEDBACK CABLES FOR 4TH|Y
01|222441|2|2|AXIS. MADE TO CORRECT LENGTH FOR OKUMA MILLAC 1052|Y
01|222448|1|1|Part Number: BT50-FMH22.225-47-200|Y
01|222448|1|2|BT50 22.225mm Shell Mill Holder|Y
01|222465|1|1|5AX-201FA-M SN:5701|Y
01|222465|1|2|RGA#TAR-61138|Y
01|222466|1|1|Quoted at NET price for 2 tools.|Y
01|222466|2|1|Net Price quoted for 5 tools.|Y
01|222468|1|1|CNC202LFA SN: 26502TCN|Y
01|222468|1|2|RGA#TAR-61201|Y
01|222469|3|1|Quoted at NET price.|Y
01|222469|7|1|TOOLING CERTIFICATE FOR $750 WITH THE PURCHASE|Y
01|222469|7|2|OF THIS PRESETTER PRIOR TO 11/30/24. MUST BE|Y
01|222469|7|3|DROP SHIPPED TO END USER.|Y
01|222470|1|1|RGA#QUA-60850/|Y
01|222470|1|2|Repair of MNL12-ER32Z-10K s/n: A0041(Alps#MSA01-4R000)|Y
01|222470|2|1|Bearings seals o-rings and drive shaft to be replaced|Y
01|222489|2|1|ANTI-ROTATION POSITIONING BLOCK FOR MORI SEIKI SH40|Y
01|222500|1|1|5AX-DD200BF2 SN: 1151|Y
01|222500|1|2|RGA#TAR-61215|Y
01|222502|2|1|ZKG16 TorqueControl Pipe Tap Collet .700 X .531 3/8PU|Y
01|222502|2|2|NO QUOTE|Y
01|222505|1|1|Req.INS/Install A3/8-24 & 3/4-KEYSET|Y
01|222505|2|1|Req.INS/Install S5/8-18X1/2|Y
01|222505|3|1|1st Batch/986735 Check installed Aroborscrew & Key|Y
01|222505|4|1|1st Batch/Install S1/2-20UNFX5/8|Y
01|222505|5|1|1st Batch/986462 8/1DWG saved in Teams|Y
01|222505|6|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|222505|7|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|222505|8|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|222505|9|1|Req.INS/Install E32-NUT|Y
01|222506|1|1|Includes External Cables|N
01|222507|2|1|IT50 1.1/4 End Mill Holder 4 GL|Y
01|222507|3|1|IT50 1.1/2 End Mill Holder 4.50 GL|Y
01|222507|4|1|IT50 1 Shell Mill Holder 1.75 GL|Y
01|222507|5|1|IT50 1.1/2 Shell Mill Holder 6.00 GL|Y
01|222514|1|1|For RGA#TAR-61255 Repair of CNC260TFA SN:14810C|Y
01|222515|8|1|Includes: Dual axis driveshort bar fiber optic cable|Y
01|222515|8|2|communications cablesbulkhead cables external cables|Y
01|222515|8|3|parameter changes service time and travel.|Y
01|222522|1|1|CNCZ205LFA - replaces CNCZ204LFA SN: 1023|Y
01|222522|1|2|Direct Mount cable for power|Y
01|222522|1|3|Direct Mount cable for feedback|Y
01|222522|1|4|6+1 built in rotary joint|Y
01|222522|2|1|Optional|Y
01|222523|1|1|IMTS Demo Unit WH2|Y
01|222523|1|2|List Price = $67410.00|Y
01|222523|2|1|For DN SOLUTIONS DNM6700 s#MV0092-002789; Oi-MF+|Y
01|222523|2|3|Hydraulic booster cost|Y
01|222523|3|1|Air Hydraulic Booster 2 circuits (24VDC)|Y
01|222523|3|2|Only required for 5AX-250FA-M|Y
01|222532|5|1|IMTS24 Promotion 10% extra added to the discount on|Y
01|222532|5|2|this quote.|Y
01|222540|2|1|Additional 10% discount applied for the 2024 IMTS|Y
01|222540|2|2|promotion for over $5000 List.  If the List falls|Y
01|222540|2|3|below $5000 then only a 5% discount will be applied.|Y
01|222543|3|1|This is a NET charge only no discount applies.|Y
01|222546|1|1|Pricing reflects Overstock Promo|Y
01|222546|2|1|Delivery: 4-pcs 2~3 Weeks / Balance 13-pcs  12 Weeks|Y
01|222546|2|2|upon receipt of order.|Y
01|222546|5|1|HSK100A-HC20-90  HSK100A Hydraulic Chuck 20mm 8K|Y
01|222546|5|2|Delivery as of 10/24: 10-pcs 3~4 weeks ARO|Y
01|222546|5|3|Balance 12~13 Weeks.|Y
01|222547|3|1|10% ADDITIONAL DISCOUNT FOR IMTS PROMO|Y
01|222549|1|1|CAT50 TAPER TO MT6 OUTPUT GL 9.80|Y
01|222549|1|2|Part #: C5004-0006-9.80|Y
01|222549|1|3|Quote at NET price for Quantity of 2.|Y
01|222549|2|1|CAT50 TAPER TO MT6 OUTPUT GL 9.80|Y
01|222549|2|2|Part #:  C5004-0006-9.80|Y
01|222549|2|3|Quote at NET price for Quantity of 4.|Y
01|222549|3|1|CAT50 TAPER TO MT6 OUTPUT GL 9.80|Y
01|222549|3|2|Part #:  C5004-0006-9.80|Y
01|222549|3|3|Quoted at NET price for Quantity of 6.|Y
01|222555|1|1|1st Batch(8/19:APRVD by BenT) Replaces C4017-0100-6.00|Y
01|222555|2|1|1st Batch(8/19:APRVD by BenT) Replaces C5007-0180-6.00|Y
01|222555|3|1|T/P Inspection Required|Y
01|222556|1|1|Please note additional 20% overstock promo applied.|Y
01|222556|1|2|This item cannot be cancelled or returned upon recept|Y
01|222556|1|3|of PO or order.|Y
01|222574|5|1|Additional 5% discount added for the 2024 IMTS|Y
01|222574|5|2|Toolholder Promotion.  Discount is for the holders|Y
01|222574|5|3|only and not the wrenches.|Y
01|222576|1|1|Req.INS/INstall E16-NUT & ER16-SCREW(C)|Y
01|222576|2|1|Req.INS/INstall E16-NUT & ER16-SCREW(C)|Y
01|222576|3|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|222576|4|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|222576|5|1|Req.INS/Install E25-NUT|Y
01|222576|6|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|222576|7|1|Req.INS/Install E32-NUT|Y
01|222576|8|1|Req.INS/Install A3/8-24 & 3/4-KEYSET|Y
01|222576|9|1|Req.INS/Install S5/8-18X1/2|Y
01|222576|10|1|Req.INS/Install E32-NUT ER32-SCREW|Y
01|222576|11|1|Req.INS/OD Groove frange Dia issue|Y
01|222579|3|1|CAT40 works on all but E410H model|Y
01|222579|4|1|CAT50 works on all but E500/650 model|Y
01|222591|2|1|Promotion IMTS24 5% has been added to the discount on|Y
01|222591|2|2|this item CAT40-MMC8C-120U-IDU .|Y
01|222591|4|1|Please Note: Discount reflects our Overstock promo|Y
01|222591|4|2|and tool is non-returnable.|Y
01|222593|6|1|Lathe autodoor for Lynx for operator door.|Y
01|222593|7|1|Installation of Lynx autodoor|Y
01|222593|8|1|Auto door for milling machine side panel type.|Y
01|222593|9|1|Installation of mill side panel autodoor|Y
01|222593|10|1|Includes: Robot integration programming part run off|Y
01|222593|10|2|and training. 10days on site|Y
01|222600|4|1|Additional 5% IMTS Promo discount applied to Lines|Y
01|222600|4|2|1-3 only. Valid until 11/30 for drop-ship orders only.|Y
01|222605|19|1|A tariff surcharge of 8% will be added to every order|Y
01|222605|19|2|placed after September 1st 2025(until further notice).|Y
01|222605|19|3|This surcharge will be acknowledged upon acceptance|Y
01|222605|19|4|of every order.|Y
01|222610|3|1|Additional 5% discount applied for the 2024 IMTS|Y
01|222610|3|2|Promotion for toolholders.|Y
01|222613|2|1|Additional 5% discount applied for the 2024 IMTS|Y
01|222613|2|2|promotion for toolholders.|Y
01|222614|5|1|Additional 10% has been added to the quote IMTS PROMO|Y
01|222614|5|2|If falls under 5K listsubmit for re-quote|Y
01|222623|2|1|Please note additional 5% applied to shrink fit per|Y
01|222623|2|2|IMTS promo.|Y
01|222624|1|1|Req.INS/Check Packaging|Y
01|222625|1|1|Please note: This item is special non-standard stock.|Y
01|222625|1|2|It cannot be cancelled or returned after receipt of PO.|Y
01|222630|1|1|Quoted at Net Price Each|Y
01|222630|1|2|Drawing #60455996.000 /SR6.2-C16-121 / SF6.2-C16-121|Y
01|222630|1|3|L-N #ST16M-SF6.2-121|Y
01|222637|6|1|Please Note: I have added the IMTS Live 10% to the|Y
01|222637|6|2|discount on this quote. See attachement with e-mail|Y
01|222637|6|3|for promotion rules.|Y
01|222639|11|1|Purchase of E346+ Presetter awards a $750 Tooling|Y
01|222639|11|2|Certificate redeemable for toolholders only. Valid|Y
01|222639|11|3|until 11/30/24 for DROP-SHIP orders only.|Y
01|222649|1|1|RGA#CUR-61220/|Y
01|222649|1|2|Reapir of C40RA-0025M s/n:21903728 02 (Mimatic#175241)|Y
01|222649|2|1|Bearings seals and o-rings to be repalced.|Y
01|222650|2|1|Includes: Drive unit short bar fiber optic cable|Y
01|222650|2|2|communications cable bulkhead cables external cables|Y
01|222650|2|3|parameter changes service time and travel.|Y
01|222654|1|1|For Samsung M500V Oi-MF. 4th-5th prep confirmed|Y
01|222654|1|2|To replace existing Koma 4th axis.|Y
01|222654|2|1|For Samsung M500V Oi-MF. 4th-5th prep confirmed|Y
01|222654|2|2|To replace existing Koma 4th axis.|Y
01|222654|3|1|Air Hydraulic Booster 2 circuits (24VDC)|Y
01|222654|3|2|Only required for 5AX-250FA-M|Y
01|222654|4|1|For 250mm Faceplace only.|Y
01|222656|2|1|POLYWRAPED EXTERNAL AND POWER FEEDBACK CABLES|Y
01|222657|7|1|ADDITIONAL 10% DISCOUNT FROM IMTS PROMO|Y
01|222660|13|1|$1000 Tooling Credit with purchase of START2|Y
01|222660|13|2|$1500 Tooling credit with purchase of Fi6|Y
01|222660|13|3|Promo ends 11/30. Valid on list price|Y
01|222661|1|1|RGA#LVR-61205/|Y
01|222661|1|2|Repair of BMT65-ER32X-ICE s/n: 20904745 03|Y
01|222661|1|3|(Mimatic#186490)|Y
01|222661|2|1|Bearings seals and o-rings to be replaced.|Y
01|222662|1|1|P/N: HSK63A-0750-9.00|Y
01|222662|1|2|HSK63A taper 3/4 end mill holder with 9.00 g.l. and|Y
01|222662|1|3|special 1.19 diameter at the nose|Y
01|222662|2|1|P/N: HSK63A-0750-9.00|Y
01|222662|2|2|HSK63A taper 3/4 end mill holder with 9.00 g.l. and|Y
01|222662|2|3|special 1.19 diameter at the nose.|Y
01|222684|5|1|Additional 5% IMTS promo discount applied to above|Y
01|222684|5|2|holders only. Valid until 11/30/24 for DROP-SHIP orders|Y
01|222684|5|3|only.|Y
01|222696|2|1|Quoted at NET price. and we will need spindle|Y
01|222696|2|2|dimensional information to create a design. We need|Y
01|222696|2|3|the machine make and model and will they need to ATC?|Y
01|222699|2|1|Please note additional 5% applied per IMTS promotion.|Y
01|222703|7|1|10% ADDITIONAL DISCOUNT FROM IMTS SHOW PROMOTION|Y
01|222706|1|1|RGA#CUR-61218/|Y
01|222706|1|2|Repair of C50-MRAM-IC s/n:94386 01 (Mimatic#162814)|Y
01|222706|2|1|Bearings seals and o-rings to be replaced.|Y
01|222706|4|1|RGA#CUR-61218/|Y
01|222706|4|2|Repair of MRAM-EXT-100 s/n:46887 03 (Mimatic#162758)|Y
01|222706|5|1|Bearings seals and o-rings to be replaced.|Y
01|222706|7|1|RGA#CUR-61218/|Y
01|222706|7|2|Repair of MRAM-ER25-IC s/n:65562 01 (Mimatic#162765)|Y
01|222706|8|1|Bearings seals o-rings and spindle to be replaced.|Y
01|222710|2|1|Sheet metal divider with junction box.|Y
01|222711|7|1|A tariff surcharge may be added to this quotation in|Y
01|222711|7|2|the event of a sustained tariff increase on the|Y
01|222711|7|3|importation of this product.  Any surcharge will be|Y
01|222711|7|4|disclosed prior to acceptance of an order.|Y
01|222714|1|1|L-N #C6-PCLNL-45165-12CP|Y
01|222714|17|1|If you are holding 6.2 please see below collet SK10-6.5|Y
01|222714|17|2|which will hold 6.2mm and we have in stock.|Y
01|222715|2|1|*this is your net price|Y
01|222715|3|1|*This is your net price|Y
01|222716|1|1|14 week delivery upon receiving signed approval|Y
01|222716|1|2|drawing.|Y
01|222718|1|1|replacement part# for C4046-0250-9.00|Y
01|222718|2|1|replacment part# C4046-0375-9.00|Y
01|222718|3|1|replacement part C4046-0500-9.00|Y
01|222718|4|1|reaplacement part# C4017-0016-6.00|Y
01|222718|5|1|replacment part# C4027-0025-6.00|Y
01|222718|6|1|replacement part# C4017-0032-5.00|Y
01|222718|21|1|replacement part# C40R5-0562-3.02|Y
01|222732|5|1|Can be used for all four (4) holders listed above.|Y
01|222737|35|1|10% ADDITIONAL DISCOUNT FOR IMTS PROMO|Y
01|222752|5|1|IMTS24 5% added to the discount for the shrink fit tool|Y
01|222770|5|1|Additional 5% added to standard 35% discount on the|Y
01|222770|5|2|CAT40-SK16-90U-IDU holder as part of IMTS promo|Y
01|222774|1|1|BT50-C12-165 - BT50 12mm Milling Chuck 160 G/L|Y
01|222776|6|1|CUSTOM DESIGNED POSITIONING BLOCK|Y
01|222777|4|1|CUSTOM DESIGNED POSITIONING BLOCKS|Y
01|222781|3|1|A tariff surcharge may be added to this quotation in|Y
01|222781|3|2|the event of a sustained tariff increase on the|Y
01|222781|3|3|importation of this product.  Any surcharge will be|Y
01|222781|3|4|disclosed prior to acceptance of an order.|Y
01|222783|4|1|Applicable to HSK63A-C3/4-95-IDU only. Valid until|Y
01|222783|4|2|11/30/24 for drop-ship orders only.|Y
01|222785|2|1|Please note additional 20% applied with our overstock|Y
01|222785|2|2|promotion. These cannot be cancelled or returned upon|Y
01|222785|2|3|order or PO received.|Y
01|222789|10|1|**Not Coolant-Sealed|Y
01|222789|14|1|HSK63A-FMC22-90|Y
01|222789|14|2|HSK63A Shell Mill Holder 22mm 90mm G/l|Y
01|222789|14|3|*Is considered a special - NET pricing|Y
01|222789|16|1|Part#: N/a|Y
01|222789|16|2|Capto C5 Shell Mill Holder 1 1/2 Gl: 60mm|Y
01|222789|16|3|Qty Breaks: (NET pricing)|Y
01|222789|16|4|5+ Pcs: $542/EA|Y
01|222789|16|5|10+ Pcs: $378/EA|Y
01|222789|16|6|*Lead time given as ADA After Signed Drawing Approval|Y
01|222790|1|1|Special IMTS end of year promotion.|Y
01|222790|8|1|Includes drive unit short bar fiber optic cable|Y
01|222790|8|2|communications cable and bulkhead cables.|Y
01|222794|1|1|L-N Item # C4-PCLNR-27050-12CP|Y
01|222795|1|1|L-N Item # C4-PCLNR-27050-12CP|Y
01|222798|1|1|TOOL CLAMPING FIXTURE BASE|Y
01|222798|2|1|BT30 TOOL CLAMPER FIXTURE HEAD|Y
01|222798|3|1|HSK63 TOOL CLAMPER FIXTURE HEAD|Y
01|222800|5|1|10% ADDITIONAL DISCOUNT FROM IMTS PROMO|Y
01|222809|7|1|ADDITIONAL 10% DISCOUNT FOR IMTS LIVE TOOL PROMO|Y
01|222815|1|1|HSK40A-SK16-80P HSK40A Slim Chuck SK16 HiSpeed 30K|Y
01|222818|4|1|Modifying in house at Lyndex-Nikken|Y
01|222821|2|1|Please note additional 5% discount added per IMTS promo|Y
01|222822|1|1|Additional 5% IMTS Promo discount applied.|Y
01|222822|4|1|Applied only to MZQT47-ER32Z. Valid until 11/30/2024|Y
01|222822|4|2|for drop-ship orders only.|Y
01|222823|1|1|Additional 5% IMTS Promo discount applied.|Y
01|222823|4|1|Applied only to MZQT47-ER32Z. Valid until 11/30/2024|Y
01|222823|4|2|for drop-ship orders only.|Y
01|222824|3|1|Caps can only be removed by destroying them. Packaging|Y
01|222824|3|2|unit 50 pcs.|Y
01|222827|10|1|A tariff surcharge may be added to this quotation in|Y
01|222827|10|2|the event of a sustained tariff increase on the|Y
01|222827|10|3|importation of this product.  Any surcharge will be|Y
01|222827|10|4|disclosed prior to acceptance of an order.|Y
01|222830|4|1|A tariff surcharge may be added to this quotation in|Y
01|222830|4|2|the event of a sustained tariff increase on the|Y
01|222830|4|3|importation of this product.  Any surcharge will be|Y
01|222830|4|4|disclosed prior to acceptance of an order.|Y
01|222849|3|1|Please confirm taper to know which SF-POT # to use.|Y
01|222851|1|1|RGA#CUR-61199/|Y
01|222851|1|2|Repair of MRAM-MI32 s/n:65605 01 (Mimatic#178045)|Y
01|222851|2|1|Bearings seals o-rings and MI32 spindle to be|Y
01|222851|2|2|replaced|Y
01|222851|4|1|RGA#CUR-61199/|Y
01|222851|4|2|Repair of MRAM-MI32 s/n:22900238 01 (Mimatic#178045)|Y
01|222851|5|1|Bearings seals and o-rings to be replaced.|Y
01|222851|7|1|RGA#CUR-61199/|Y
01|222851|7|2|Repair of C40RAM-MI50-180-65TP s/n:21903643 01|Y
01|222851|7|3|(Mimatic#178151)|Y
01|222851|8|1|Bearings seals and o-rings to be replaced.|Y
01|222853|2|1|Full overhaul parts cost (for 2 units)|Y
01|222853|2|2|Bearings/Seals/O-Rings/WScrew/WWheel and etc. included.|Y
01|222853|3|1|Labor + Expenses (for 4 L-N Service Persons)|Y
01|222853|3|2|Driving - 2 Days (20 hours round trip)|Y
01|222853|3|3|Working - 3 Days (Weekend Holidays Rate)|Y
01|222853|3|4|Gas/Meals/Travel Expenses (Est) and etc included.|Y
01|222853|8|1|Full overhaul parts cost (for 2 units)|Y
01|222853|8|2|Bearings/Seals/O-Rings/WScrew/WWheel and etc. included.|Y
01|222853|9|1|Labor + Expenses (for 4 L-N Service Persons)|Y
01|222853|9|2|Driving - 2 Days (20 hours round trip)|Y
01|222853|9|3|Working - 3 Days (Weekend Holidays Rate)|Y
01|222853|9|4|Gas/Meals/Travel Expenses (Est) and etc included.|Y
01|222858|1|1|List Price = $900.00ea.|Y
01|222858|1|2|Spec. Disc. applied|Y
01|222858|2|1|List Price = $635.00ea.|Y
01|222858|2|2|Spec. Disc. applied|Y
01|222865|3|1|Heidenhain scale with mounting kit +/-3|Y
01|222876|1|1|1st Batch|Y
01|222876|2|1|1st Batch|Y
01|222876|3|1|1st Batch/990136 Futurcarb 10/4:DWG Approved.|Y
01|222878|1|1|Please note additional 20% overstock promo applied.|Y
01|222878|1|2|This item cannot be cancelled or returned upon receipt|Y
01|222878|1|3|of PO or order.|Y
01|222879|2|1|Cable set- power/feedbackcable from RT to machine tool|Y
01|222882|18|1|Please note additional 5% applied to SK holders with|Y
01|222882|18|2|our IMTS promotion.|Y
01|222889|2|1|Power/Feedback cable from RT to machinetool- cable set|Y
01|222893|2|1|CUSTOM POSITIONING BLOCK FOR ROBODRILL T21iFL|Y
01|222894|2|1|CUSTOM POSITIONING BLOCK FOR CAT40 HAAS MACHINE|Y
01|222897|1|1|Please Advise: Does the customer need Makino drive|Y
01|222897|1|2|pins? Price reflects 1 to 9 toolholders and Makino Pins|Y
01|222897|1|3|installed.|Y
01|222897|2|1|Price reflects 1 to 9 toolholders and no Makino Pins.|Y
01|222897|9|1|Here is another option depending on what size shank|Y
01|222897|9|2|they are holding. This holder has no Makino pins.|Y
01|222897|9|3|However if they need them we can install in house.|Y
01|222918|2|1|Please Note: IMTS promotion 5% has been added to the|Y
01|222918|2|2|discount on this quote. Thank you!|Y
01|222919|1|1|5AX-2MT-105-120-SA-BR2 SN:8275|Y
01|222919|1|2|TAR-61302|Y
01|222919|1|3|Full rebuild of the table include labor all basic|Y
01|222919|1|4|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|222921|2|1|NOTE:  Additional 20% overstock promotion discount|Y
01|222921|2|2|applied.  Once a PO is placed this item cannot be|Y
01|222921|2|3|cancelled or returned.|Y
01|222926|9|1|Additional 5% discount added to the holder IMTS promo|Y
01|222928|4|1|These are custom application units. Application must be|Y
01|222928|4|2|approved. Once a PO has been issued these cannot be|Y
01|222928|4|3|cancelled or returned.|Y
01|222931|1|1|CT40-HC-80.5|Y
01|222931|2|1|CAT40-HC10-110|Y
01|222936|6|1|IMTS Promotion 5% extra added to the discount on the|Y
01|222936|6|2|NBT30-SK25-90.|Y
01|222957|4|1|IMTS Promotion 5% extra added to the discount on this|Y
01|222957|4|2|quote!|Y
01|222958|3|1|Please note additional 10% applied per IMTS promotion.|Y
01|222960|5|1|Please note additional 10% applied per IMTS promotion.|Y
01|222962|3|1|Please note additional 10% applied per IMTS promotion.|Y
01|222969|1|1|Special made arbor screw.  Min qty 5pcs - Made to match|Y
01|222969|1|2|customer supplied drawing/specificatoins.|Y
01|222970|2|1|Overstock promotion extra 20% added to the discount|Y
01|222970|2|2|for C50S6-1500-2.25.There exactly 2 holders left in|Y
01|222970|2|3|stock.|Y
01|222973|35|1|10% ADDITIONAL DISCOUNT FOR IMTS PROMO|Y
01|222985|5|1|Self contained 5c dead length collet closer|Y
01|222985|5|2|with adapter ring|Y
01|222985|6|1|16C self contained dead lenght collet closer|Y
01|222992|2|1|IMTS24 Promotion extra 5% applied to the discount on|Y
01|222992|2|2|this quote. If you should go under $500.00 list price|Y
01|222992|2|3|your discountis 35%. Thank you!|Y
01|222993|9|1|Overstock Promotion 20% extra added to the discount|Y
01|222993|9|2|in this quote. Item is non-returnable.|Y
01|222997|1|1|RGA#LVR-61253/|Y
01|222997|1|2|Repair of MNL12-SK20Z-MS-C-3MP-MIM s/n: 95528 03|Y
01|222997|1|3|(Mimatic#192374)|Y
01|222997|2|1|Bearings seals and o-rings to be replaced.|Y
01|222998|1|1|5 available in one (1) week ARO.|Y
01|222998|1|2|Balance of other five (5) 3~4 weeks ARO.|Y
01|223000|1|1|RGA#CUR-61266/|Y
01|223000|1|2|Repair of C50-MRAM s/n:22905804 04 (Mimatic#162732)|Y
01|223000|2|1|Bearings seals and o-rings to be replaced.|Y
01|223000|4|1|RGA#CUR-61266/|Y
01|223000|4|2|Repair of PA110-CAT s/n: 22907553 03 (Mimatic#162745)|Y
01|223000|5|1|Tool evaluated at no charge|Y
01|223000|7|1|RGA#CUR-61266/|Y
01|223000|7|2|Repair of MRAM-NSK-M17 s/n:22907064 05 (Mimaitc#162756)|Y
01|223000|8|1|Bearings seals and o-rings to be replaced.|Y
01|223001|4|1|5% ADDITIONAL DISCOUNT FROM PROMO|Y
01|223003|5|1|Please note: Overstock promotion 20% has been added to|Y
01|223003|5|2|the discount on this quote.|Y
01|223003|5|3|Wrenches are at no charge.|Y
01|223006|2|1|Requires 2 sets. Power and feed back cables from the|Y
01|223006|2|2|nikken table to the Haas Bulkhead|Y
01|223006|2|3|Requires Haas 4th and 5th Axis Interface and Haas|Y
01|223006|2|4|3rd Party Software Option|Y
01|223007|2|1|InStock - Ships 3 to 5 Days After Reciept of order|Y
01|223007|2|2|F.O.B. - Mundelein IL 60060|Y
01|223007|3|1|The NCT200YA-M will include Power and Feedback Cables|Y
01|223007|3|2|From the Table to the Machine Bulk Head.|Y
01|223007|3|3|Arbiser will need to purchase the 3rd Party Software|Y
01|223007|3|4|From Haas and installed before the Nikken install|Y
01|223007|6|1|InStock - Ships 3 to 5 Days After receipt of order|Y
01|223007|6|2|F.O.B. Mundelein IL 60060|Y
01|223007|7|1|The CNC180YA-M will include Power and FeedBack Cables|Y
01|223007|7|2|from the table to the Machine Bulk Head|Y
01|223007|7|3|Arbiser will need to purchase the 3rd Party Software|Y
01|223018|1|1|Overstock 20% off List ($2993.00)|Y
01|223018|6|1|5% off on orders of $5000-$9999|Y
01|223030|1|1|Installed with PS-868 at the factory|Y
01|223030|1|2|Quoted as NET pricing non-returnablenon-cancellable|Y
01|223035|2|1|A tariff surcharge may be added to this quotation in|Y
01|223035|2|2|the event of a sustained tariff increase on the|Y
01|223035|2|3|importation of this product.  Any surcharge will be|Y
01|223035|2|4|disclosed prior to acceptance of an order.|Y
01|223041|5|1|A tariff surcharge may be added to this quotation in|Y
01|223041|5|2|the event of a sustained tariff increase on the|Y
01|223041|5|3|importation of this product.  Any surcharge will be|Y
01|223041|5|4|disclosed prior to acceptance of an order.|Y
01|223046|5|1|IMTS24 promotion 5% extra added to the discount.|Y
01|223047|1|1|RGA#LVR-61252/|Y
01|223047|1|2|Repair of MZMP47-ER32X-OFF-ICE s/n:21902969 08|Y
01|223047|1|3|(Mimatic#124255)|Y
01|223047|2|1|Bearings selas and o-rings to be replaced.|Y
01|223047|4|1|RGA#LVR-61252/|Y
01|223047|4|2|Repair of MZMP47-ER32Z-ICE s/n:86648 03(Mimatic#124864)|Y
01|223047|5|1|Bearings seals o-rings and input spindle to be|Y
01|223047|5|2|replaced.|Y
01|223056|1|1|HSK50A-CZF20-115 HSK Zero Fit Milling Chuck|Y
01|223056|7|1|HSK50A-SZF25C-135 HSK Zero Fit Type Slim Chuck|Y
01|223056|7|2|One (1) currently in stock at Nikken 1~2 weeks ARO/|Y
01|223056|7|3|balance will be early December.|Y
01|223060|1|1|RGA#CUR-61265/|Y
01|223060|1|2|Repair of MRAM-ER16L s/n:42992 03 (Mimatic#162707)|Y
01|223060|2|1|Bearings seals o-rings and spindle to be replaced.|Y
01|223060|4|1|RGA#CUR-61265/|Y
01|223060|4|2|Repair of PA65-CAT/BT s/n:21904852 05 (Mimatic#162741)|Y
01|223060|5|1|Tool evaluated at no charge.|Y
01|223060|7|1|RGA#CUR-61265/|Y
01|223060|7|2|Repair of C40-MRAM s/n:22902449 04 (Mimatic#162731)|Y
01|223060|8|1|Bearings seals and o-rings to be replaced.|Y
01|223063|1|1|1st Batch/stock 6/26 approved|Y
01|223063|2|1|1st Batch/for stock  3/25 approved|Y
01|223063|3|1|T/P Inspection Required|Y
01|223063|4|1|T/P Inspection Required|Y
01|223063|5|1|T/P Inspection Required|Y
01|223063|6|1|T/P Inspection Required|Y
01|223063|7|1|T/P Inspection Required|Y
01|223063|8|1|1st Batch *Pls. provide Drawing.|Y
01|223063|9|1|1st Batch/Stock|Y
01|223065|31|1|A tariff surcharge may be added to this quotation in|Y
01|223065|31|2|the event of a sustained tariff increase on the|Y
01|223065|31|3|importation of this product.  Any surcharge will be|Y
01|223065|31|4|disclosed prior to acceptance of an order.|Y
01|223070|1|1|Please note additional discount applies to qty. breaks|Y
01|223070|1|2|and must be purchased all at once.|Y
01|223074|3|1|Includes Electronics labor and travel cost.|Y
01|223074|3|2|Installation for 2 Tables.|Y
01|223074|4|1|A tariff surcharge of 8% will be added to every order|Y
01|223074|4|2|placed after September 1st 2025(until further notice).|Y
01|223074|4|3|This surcharge will be acknowledged upon acceptance|Y
01|223074|4|4|of every order.|Y
01|223076|1|1|RGA#LVR-61232/|Y
01|223076|1|2|Repair of NK103-12000 s/n:AL0025 (Alps#NK103-12002)|Y
01|223076|2|1|Bearings o-rings and collet nut to be replced.|Y
01|223076|4|1|RGA#LVR-61232/|Y
01|223076|4|2|Repair of NK103-12000 s/n:AL0034 (Alps#NK103-12002)|Y
01|223076|5|1|Bearings o-rings and collet nut to be replced.|Y
01|223079|1|1|RGA#LVR-61258/|Y
01|223079|1|2|Repair of OKU-L370-X s/n: AL560 (Alps#OK101-14000)|Y
01|223079|2|1|Bearings o-rings and collet nut to be replaced.|Y
01|223079|4|1|RGA#LVR-61258/|Y
01|223079|4|2|Repair of OKU-L370MW-MN s/n:A0002 (Alps#OK109-13001)|Y
01|223081|2|1|External coolant filter required! 25um or better|Y
01|223082|6|1|Modular Locking Unit A 118 suitable for HSK100|Y
01|223082|6|2|DMG DMC125|Y
01|223086|1|1|RGA#TOR-61259/|Y
01|223086|1|2|Repair of S3/4-UMTB|Y
01|223092|4|1|Please Note: I added the IMTS promo 5% extra to the|Y
01|223092|4|2|discount for the CAT40-SK16-90U-IDU|Y
01|223094|3|1|Adapter Plate for QCFC42|Y
01|223094|4|1|Over stock discount|Y
01|223094|5|1|Over stock Discount|Y
01|223094|6|1|Includes Electronics labor and travel cost|Y
01|223094|6|2|Installation for 2 tables|Y
01|223095|5|1|Please note: Overstock promotion 20% has been added to|Y
01|223095|5|2|the discount on this quote|Y
01|223095|5|3|Wrenches are at no charge.|Y
01|223098|2|1|Please note additional 20% discount applied per|Y
01|223098|2|2|overstock promo. These items cannot be cancelled or|Y
01|223098|2|3|returned upon receipt of PO/order.|Y
01|223102|15|1|Please Note: This holder is being discontinued once|Y
01|223102|15|2|the 5 holders are gone. We will offer the|Y
01|223102|15|3|NB4007-0016-4.00G in it place. See quote below.|Y
01|223102|19|1|NB4007-0016-4.00G NBT40 DualContact ER16 Collet Chuck|Y
01|223102|19|2|smoothBearingNut 25K|Y
01|223102|27|1|NBT40-SK13C-90P NBT40 DualContact Slim Chuck SK13|Y
01|223102|27|2|Coolant HiSpeed 30K|Y
01|223102|27|3|These would take the place of the ER16 & ER20 chucks.|Y
01|223115|1|1|IMTS 5% Additional discount for this project.|Y
01|223120|3|1|Fanuc CRX 5iA|Y
01|223120|5|1|Includes compute box|Y
01|223120|7|1|Delrin tray 56 location in the tray|Y
01|223142|1|1|Additional 5% IMTS Promo discount applied.|Y
01|223142|2|1|Additional 5% discount applied to BMT45-BG12Z-C only.|Y
01|223142|2|2|Valid until 11/30/24 for DROP-SHIP orders only.|Y
01|223144|1|1|for US M8 tap|Y
01|223144|4|1|Non-coolant M10 DIN tap|Y
01|223159|1|1|Additional 5% IMTS promo discount applied.|Y
01|223159|4|1|Applicable to MZMP47-ER32Z only. Valid until 11/30/24|Y
01|223159|4|2|for DROP-SHIP orders only.|Y
01|223170|1|1|Final Part# TBD  **Quoted at NET Price**|Y
01|223170|1|2|Desription: Mimatic Driven Toolholder for Mazak HQR 200|Y
01|223170|1|3|Slim Line Version:|Y
01|223170|1|4|Shaft: VDI40; collet holder: ER8; coolant/air supply:|Y
01|223170|1|5|external via pipe: Rotation: output is reversal to|Y
01|223170|1|6|input. Length: L=115.5mm/L1=63.6mm; Gear ratio: 1:2|Y
01|223170|1|7|Max torque: 3 Nm; Max spindle rev: n1(max)=4000rpm/n2|Y
01|223170|1|8|(max)=8000rpm; Weight: approx 9.5kg; Drawing# 00063813|Y
01|223170|2|1|A tariff surcharge may be added to this quotation in|Y
01|223170|2|2|the event of a sustained tariff increase on the|Y
01|223170|2|3|importation of this product.  Any surcharge will be|Y
01|223170|2|4|disclosed prior to acceptance of an order.|Y
01|223187|5|1|Purchase of E346+ Presetter awards a $750 Tooling|Y
01|223187|5|2|Certificate redeemable for toolholders only. Valid|Y
01|223187|5|3|until 11/30/24 for drop-ship orders only.|Y
01|223192|8|1|A tariff surcharge may be added to this quotation in|Y
01|223192|8|2|the event of a sustained tariff increase on the|Y
01|223192|8|3|importation of this product.  Any surcharge will be|Y
01|223192|8|4|disclosed prior to acceptance of an order.|Y
01|223198|33|1|Additional 10% IMTS promo discount applied applicable|Y
01|223198|33|2|to shrink fit holder and  MMC holders above only.|Y
01|223198|33|3|Should quantities change please resubmit for quote.|Y
01|223198|33|4|Valid until 11/30/24 for drop-ship orders only.|Y
01|223199|3|1|Adapter plate for QCFC|Y
01|223199|9|1|A tariff surcharge may be added to this quotation in|Y
01|223199|9|2|the event of a sustained tariff increase on the|Y
01|223199|9|3|importation of this product.  Any surcharge will be|Y
01|223199|9|4|disclosed prior to acceptance of an order.|Y
01|223206|24|1|*Non-standard stock and considered a special.|Y
01|223206|24|2|Cannot be cancelled or returned|Y
01|223212|1|1|Delivery is based upon receipt of order 11/01|Y
01|223212|1|2|IMTS promotion 5% extra added to the discount.|Y
01|223214|3|1|Quoted at Net Price or we can do a virtual meeting|Y
01|223214|3|2|at no charge.|Y
01|223214|7|1|TOOLING CERTIFICATE FOR $750 WITH THE PURCHASE|Y
01|223214|7|2|OF THIS PRESETTER PRIOR TO 11/30/24. MUST BE|Y
01|223214|7|3|DROP SHIPPED TO END USER.|Y
01|223218|10|1|Misc hoses and fittings included|Y
01|223223|33|1|Delivery: 2 pcs STOCK 7pcs 11/6 Balance ~4 Wks|Y
01|223225|1|1|T14 = .5 INCH FINISHING END MILL|Y
01|223225|1|2|T15 = .5 INCH ROUGHING END MILL|Y
01|223225|3|1|T117 = #32 CARBIDE DRILL|Y
01|223225|4|1|T117 = #32 CARBIDE DRILL|N
01|223225|5|1|T118 = 120 CHAMFER TOOL|Y
01|223225|7|1|T120 = 0.25 X .06 RAD GROOVE TOOL|Y
01|223225|7|2|T121 = IMCO .25 END MILL|Y
01|223225|9|1|T122 = .040 x O.108 ID Groove Tool|Y
01|223225|11|1|T124 = 3/8 x .020 Slot Cutter|Y
01|223225|13|1|T125 = 1/8 x .750 Dia SLOT CUTTER|Y
01|223225|15|1|T126 = .025 x .750 Dia Slitting Saw|Y
01|223225|15|2|T127 = 90 Double Angle Cutter|Y
01|223225|18|1|T128 = .116 End Mill|Y
01|223238|33|1|Delivery: 2 pcs STOCK 7pcs 11/6 Balance Pending|Y
01|223242|1|1|C4.DVR.OK.B|Y
01|223242|1|2|Price only valid for 10 units|Y
01|223242|1|3|Net price for MMC|Y
01|223242|17|1|C4-DTJNR-27050-16CP|Y
01|223242|17|2|Minimum quantity order of 3 pcs.|Y
01|223242|17|3|Net price for MMC|Y
01|223242|18|1|PPPT.16|Y
01|223242|19|1|ML.M08|Y
01|223255|2|1|Please Note: Discount reflects extra 20% on above|Y
01|223255|2|2|holder. These are on our Overstock promotion.|Y
01|223256|1|1|1st Batch/For stock 1/9:DWG Approved/BTMFG6/30>10/30#4|Y
01|223256|2|1|T/P Inspection Required|Y
01|223256|3|1|T/P Inspection Required|Y
01|223256|4|1|SO#991393  SP Item. T/P Inspection Required|Y
01|223256|5|1|1st Batch/Stock|Y
01|223258|1|1|1st Batch/stock 6/26 approved|Y
01|223258|2|1|1st Batch/for stock  3/25 approved|Y
01|223258|3|1|T/P Inspection Required|Y
01|223258|4|1|T/P Inspection Required|Y
01|223258|5|1|T/P Inspection Required|Y
01|223258|6|1|T/P Inspection Required|Y
01|223258|7|1|T/P Inspection Required|Y
01|223258|8|1|1st Batch|Y
01|223258|9|1|1st Batch/Stock|Y
01|223259|1|1|1st Batch|Y
01|223259|2|1|1st Batch/991104 DWG Saved in Teams File|Y
01|223259|3|1|1st Batch|Y
01|223259|4|1|1st Batch|Y
01|223266|1|1|Final Part# TBD  **Quoted at NET Price**|Y
01|223266|1|2|Description: Straight Y-Unit Adjustable +/-90 deg VDI|Y
01|223266|1|3|50 Mazak SQT28/QTNEXUS 300/350: Mimatic driven toolhol|Y
01|223266|1|4|der straight Y-swing version. Central offset: V=50mm|Y
01|223266|1|5|Swing range: 180deg (+/-90deg) Shank: VDI50 (similar to|Y
01|223266|1|6|DIN 69880/DIN ISO 10889) Tooling interface: ER25 collet|Y
01|223266|1|7|system (0.5-16.0mm DIN 6499) Coolant: external supply|Y
01|223266|1|8|via pipe/nozzles. Rotation: output is reversal to input|Y
01|223266|1|9|Max coolant pressure: 50bar(725psi) Max torque 25 Nm|Y
01|223266|1|10|Max spindle revolution: 6500rpm(for main spindle app)|Y
01|223266|16|1|Final Part#: TBD   **Quoted at NET price**|Y
01|223266|16|2|Description: Straight Y-Swing Version Fixed in Y-Axis|Y
01|223266|16|3|+12.7mm VDI 50: Central offset: V=50mm Gear ratio 1:1|Y
01|223266|16|4|Fixed in Y-axis: +12.7mm Shank: VDI50 (similar to DIN|Y
01|223266|16|5|69880/DIN ISO 10889) Tooling interface: ER25 collet|Y
01|223266|16|6|system(0.5-16.0mmDIN 6499) Coolant: external supply|Y
01|223266|16|7|via pipe/nozzles Rotation: output is reveral to input|Y
01|223266|16|8|Max coolant pressure: 50bar (725 psi) Max torque: 25Nm|Y
01|223266|16|9|Max spindle revolution: 6500rpm (for main spindle|Y
01|223266|16|10|applications) Similar to Mimatic drawings: 00054916/|Y
01|223269|1|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|223269|2|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|223269|3|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|223269|4|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|223269|5|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|223269|6|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|223269|7|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|223269|8|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|223269|9|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|223269|10|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|223278|6|1|Assembly containing WS-CN180R021 and CN180L022|Y
01|223281|1|1|Final Part#: TBD **Quoted at NET** price|Y
01|223281|1|2|Description: Angle DTH Twin Version i=1:1 VDI40|Y
01|223281|1|3|Mazak Nexus 250 MSY:|Y
01|223281|1|4|Shaft: VDI40 (similar to DIN ISO 10889) Axis distance:|Y
01|223281|1|5|A=60mm Tooling interface: 2x ER25 collet system (0.5-|Y
01|223281|1|6|16.0 mm DIN 6499) Coolant: external supply through|Y
01|223281|1|7|pipe Length: L1=130mm Reversal of rotation (input doe|Y
01|223281|1|8|s not equal output) Gear ratio: 1:1 Max torque: 15Nm|Y
01|223281|1|9|per spindle. Max rev speed: 6500 rpm (both spindles)|Y
01|223281|1|10|Weight: approx. 9.5kg Drawing# 00033277|Y
01|223281|16|1|Final Part#: TBD  **Quoted at NET price**|Y
01|223281|16|2|Description: Angle DTH Twin Version i=1:1 A=44.44mm|Y
01|223281|16|3|VDI40 Mazak Nexus 250 MSY:|Y
01|223281|16|4|Shaft: VDI 40 (similar to DIN ISO 10889) Tooling|Y
01|223281|16|5|interface: 2x ER16 collet system (0.5-12.0mm DIN 6499)|Y
01|223281|16|6|Coolant: external supply via pipe Length: L1=130mm/|Y
01|223281|16|7|140mm Axis distance: A=44.44mm (offset+15/-29.44mm)|Y
01|223281|16|8|Reversal of rotation (input doesn't equal output)|Y
01|223281|16|9|Gear ratio: 1:1 max torque: 15Nm per spindle Max rev|Y
01|223281|16|10|speed: 6500rpm (both spindles) Drawing# 00037838|Y
01|223282|1|1|Part# MU40-SK16X-ICE|Y
01|223282|1|2|MURATEC LIVE - BMT40 - STRAIGHT- DRVL=71.5mm - SK16 ICE|Y
01|223282|1|3|L1 APPROX = 71mm; 1:1 GEAR MAX 40Nm; 6500 RPM;|Y
01|223282|1|4|REF DRW# 00024168|Y
01|223282|1|5|Quoted at NET price.|Y
01|223282|5|1|Part# MU40-SK16Z-ICE|Y
01|223282|5|2|MURATEC LIVE - BMT40 - 90DEG HEAD -|Y
01|223282|5|3|DRVL=71.5mm - SK16 - ICE;L1  = 100mm;|Y
01|223282|5|4|1:1 GEAR MAX 25Nm; 8000 RPM;|Y
01|223282|5|5|Quoted at NET price.|Y
01|223288|2|1|Lyndex-Nikken to make positioning block upon receipt of|Y
01|223288|2|2|spindle drawing information. *NET price|Y
01|223296|1|1|P/N: C4507-0016-6.00|Y
01|223296|2|1|P/N: C4507-0016-4.00|Y
01|223296|3|1|P/N: C4507-0020-6.00|Y
01|223296|4|1|P/N: C4507-0020-4.00|Y
01|223297|5|1|Please note: IMTS24 extra 5% added to discount on the|Y
01|223297|5|2|HSK63A-SK10C-105-IDU.|Y
01|223299|4|1|Please Note: 5% extra has been added to the|Y
01|223299|4|2|CAT50-C1.1/4-90U-IDU. IMTS promotion see attached in|Y
01|223299|4|3|e-mail.|Y
01|223305|1|1|PCQC65 Collet Certificate|Y
01|223314|4|1|Valid for MNL12-ER40X only|N
01|223322|3|1|These are non-standard stock items and considered|Y
01|223322|3|2|specials. Once a PO has been issued  items cannot be|Y
01|223322|3|3|cancelled or returned. Please allow 8 weeks mfg. after|Y
01|223322|3|4|approval drawing received and 2 weeks to ship.|Y
01|223322|4|1|These are non-standard stock items and considered|Y
01|223322|4|2|specials. Once a PO has been issued  items cannot be|Y
01|223322|4|3|cancelled or returned. Please allow 8 weeks mfg. after|Y
01|223322|4|4|approval drawing received and 2 weeks to ship.|Y
01|223322|6|1|These are non-standard stock items and considered|Y
01|223322|6|2|specials. Once a PO has been issued items cannot be|Y
01|223322|6|3|cancelled or returned. Please allow 8 weeks mfg. after|Y
01|223322|6|4|approval drawing received and 2 weeks to ship.|Y
01|223322|6|5|Please note pricing only applies with qty. purchased.|Y
01|223322|7|1|These are non-standard stock items and considered|Y
01|223322|7|2|specials. Once a PO has been issued items cannot be|Y
01|223322|7|3|cancelled or returned. Please allow 8 weeks mfg. after|Y
01|223322|7|4|approval drawing received and 2 weeks to ship.|Y
01|223322|7|5|Please note pricing only applies with qty. purchased.|Y
01|223322|9|1|These are non-standard stock items and considered|Y
01|223322|9|2|specials. Once a PO has been issued items cannot be|Y
01|223322|9|3|cancelled or returned. Please allow 8 weeks mfg. after|Y
01|223322|9|4|approval drawing received and 2 weeks to ship.|Y
01|223322|9|5|Please note pricing only applies with qty. purchased.|Y
01|223322|10|1|These are non-standard stock items and considered|Y
01|223322|10|2|specials. Once a PO has been issued items cannot be|Y
01|223322|10|3|cancelled or returned. Please allow 8 weeks mfg. after|Y
01|223322|10|4|approval drawing received and 2 weeks to ship.|Y
01|223322|10|5|Please note pricing only applies with qty. purchased.|Y
01|223332|4|1|PRICE INCLUDES ALL ITEMS NEEDED FOR INSTALL MINUS|Y
01|223332|4|2|TRAVEL EXPENSES|Y
01|223347|1|1|CAT40-ZMAC42-150UV|Y
01|223350|14|1|Part# TBD **Quoted at NET Price**|Y
01|223350|14|2|Dual-Contact CAT50 C6 output 3.00 Projection|Y
01|223350|14|3|BCV50-C6-3-OHA|Y
01|223350|14|4|Please note: This is special non-standard stock. Once|Y
01|223350|14|5|a PO is placed this item cannot be cancelled or|Y
01|223350|14|6|returned.|Y
01|223350|14|7|Delivery: ~10 weeks after approval drawing is signed|Y
01|223350|14|8|by the customer|Y
01|223350|15|1|Final Part# TBD **Quoted at NET price**|Y
01|223350|15|2|Locking Block|Y
01|223350|16|1|A tariff surcharge may be added to this quotation in|Y
01|223350|16|2|the event of a sustained tariff increase on the|Y
01|223350|16|3|importation of this product.  Any surcharge will be|Y
01|223350|16|4|disclosed prior to acceptance of an order.|Y
01|223355|14|1|Part# TBD **Quoted at NET Price**|Y
01|223355|14|2|Dual-Contact CAT50 C6 output 3.00 Projection|Y
01|223355|14|3|BCV50-C6-3-OHA|Y
01|223355|14|4|Please note: This is special non-standard stock. Once|Y
01|223355|14|5|a PO is placed this item cannot be cancelled or|Y
01|223355|14|6|returned.|Y
01|223355|14|7|Delivery: ~10 weeks after approval drawing is signed|Y
01|223355|14|8|by the customer|Y
01|223355|15|1|Final Part# TBD **Quoted at NET price**|Y
01|223355|15|2|Locking Block|Y
01|223357|1|1|HSK50A-HC10-85: 10mm Hydraulic Chuck with 85mm GL|Y
01|223357|1|2|Currently two (2) in stock at the factory.|Y
01|223357|1|3|Balance would be 12~14 weeks ARO.|Y
01|223371|1|1|CAT50 C1.1/4 16.5(419.1mm) gage length|Y
01|223371|1|2|CAT50 Milling Chuck 1.1/4 ID|Y
01|223375|1|1|BMT65-STC5Z-IC|Y
01|223375|1|2|BMT65 Static PSC C5 Z<Axial>90D IntC|Y
01|223375|2|1|BMT65-STC5Z-IC|Y
01|223375|2|2|BMT65 Static PSC C5 Z<Axial>90D IntC|Y
01|223375|4|1|BMT65-STC5Z-MS-IC|Y
01|223375|4|2|BMT65 Static PSC C5 Z<Axial>90D MainSub1+1 IntC|Y
01|223375|5|1|BMT65-STC5Z-MS-IC|Y
01|223375|5|2|BMT65 Static PSC C5 Z<Axial>90D MainSub1+1 IntC|Y
01|223375|5|4|Delivery = 12 weeks after approval drawing is|Y
01|223375|5|5|signed and returned.|Y
01|223380|1|1|P/N: C4507-0016-6.00|Y
01|223380|1|2|CAT45 taper ER16 collet chuck with 6.00 gauge length|Y
01|223380|2|1|P/N: C4507-0016-4.00|Y
01|223380|2|2|CAT45 taper ER16 collet chuck with 4.00 gauge length|Y
01|223380|3|1|P/N: C4507-0020-6.00|Y
01|223380|3|2|CAT45 taper ER20 collet chuck with 6.00 gauge length|Y
01|223380|4|1|P/N: C4507-0020-4.00|Y
01|223380|4|2|CAT45 taper ER20 collet chuck with 4.00 gauge length|Y
01|223384|17|1|Additional 5% discount added to holders per promotion|Y
01|223391|3|1|SHANK: BMT68|Y
01|223391|3|2|TOOLING INTERFACE: CAPTO C3|Y
01|223391|3|3|COOLANT: INTERNAL THRU SPINDLE & EXTERNAL THRU PIPING|Y
01|223391|3|4|ROTATION: OUTPUT IS REVERSAL TO INPUT|Y
01|223391|3|5|CENTER HEIGHT: 80MM|Y
01|223391|3|6|GEAR RATIO: 1:2 (6500 INPUT = 13000 OUTPUT)|Y
01|223391|3|7|DRAWING # 00063776-C3|Y
01|223391|3|8|TOOL WEIGHT: APPROX. 8.5 KG|Y
01|223393|1|1|The above item is a non-stock standard item and|Y
01|223393|1|2|considered special. Once a PO has been issued it cannot|Y
01|223393|1|3|be cancelled or returned.|Y
01|223396|1|1|**This is special non-standard stock. It cannot be|Y
01|223396|1|2|cancelled or returned after receipt of PO.|Y
01|223397|3|1|HSK63T-SLT20-100|Y
01|223397|3|2|Pratt & Whitney Part # PT979557 must be etched on|Y
01|223397|3|3|tooling and packaging.|Y
01|223411|5|1|PRESETTER INSTALLATION & TRAINING ONLY|Y
01|223411|12|1|INSTALLATION & TRAINING FOR 1 TID INSTALLATION.|Y
01|223411|12|2|INSTALLATION MUST BE DONE AT THE SAME TIME AS|Y
01|223411|12|3|PRESETTER TRAINING.|Y
01|223412|5|1|PRESETTER INSTALLATION & TRAINING ONLY|Y
01|223412|5|2|FLETCHER POLAND WILL INSTALL PRESETTER AT NO COST|Y
01|223412|12|1|INSTALLATION & TRAINING FOR 1 TID INSTALLATION.|Y
01|223412|12|2|INSTALLATION MUST BE DONE AT THE SAME TIME AS|Y
01|223412|12|3|PRESETTER TRAINING.|Y
01|223412|12|4|ERIC HARTMAN WILL PERFORM TID INSTALLATION|Y
01|223414|6|1|Price is pending from Mimatic however they have stock|Y
01|223414|6|2|so 2~3 weeks upon receipt of order.|Y
01|223418|2|1|ADDITIONAL 10% DISCOUNT FROM IMTS PROMO|Y
01|223426|3|1|Installation includes drive unit short bar fiber|Y
01|223426|3|2|optic cable communications cable bulkhead cables|Y
01|223426|3|3|external cables sheet metal modifications parmeter|Y
01|223426|3|4|changes service time and travel.|Y
01|223436|3|1|Additional 10% added to standard discount of 28%|Y
01|223436|3|2|for IMTS promo (10% discount over $5000 list)|Y
01|223443|3|1|HSK63T-SLT20-100|Y
01|223443|3|2|Pratt & Whitney Part # PT979557 must be etched on|Y
01|223443|3|3|tooling and packaging.|Y
01|223451|1|1|Qty breaks:|Y
01|223451|1|2|5+ Pcs: $219/EA|Y
01|223451|1|3|10+ Pcs: $154/EA|Y
01|223454|1|1|1st Batch|Y
01|223454|2|1|1st Batch|Y
01|223478|8|1|MI63-EM1.1/4|Y
01|223481|1|1|Please note additional 20% applied on overstock promo.|Y
01|223481|1|2|Once PO and order has been issued this cannot be|Y
01|223481|1|3|cancelled or returned.|Y
01|223489|4|1|Please note: IMTS24 promo 10% extra has been added to|Y
01|223489|4|2|the discount on this quote. Promotion ends 11/27/2024|Y
01|223492|4|1|Additional 5% discount applied for the 2024 IMTS|Y
01|223492|4|2|Promotion for Live Tooling for $500-$5000 List.|Y
01|223495|3|1|Additional 5% discount has been applied to these|Y
01|223495|3|2|holders for the 2024 IMTS Promotion for Advanced|Y
01|223495|3|3|Tooling.|Y
01|223495|5|1|This wrench can be used for either holders listed|Y
01|223495|5|2|above.|Y
01|223503|2|1|Full overhaul parts cost + Labor (For 2 Units)|Y
01|223503|2|2|Bearings/Seals/O-Rings/WScrew/WWheel and etc. included.|Y
01|223503|2|3|Labor + Expenses (for 4 L-N Service Persons)|Y
01|223503|2|4|Driving - 2 Days (20 hours round trip)|Y
01|223503|2|5|Working - 2 Days (Weekend Holidays Rate|Y
01|223503|2|6|Gas/Meals/Travel Expenses (Est) and etc included.|Y
01|223505|1|1|Delivery: 1 pc STOCK ~10 Weeks for additional pieces|Y
01|223505|2|1|Delivery: 1 pc STOCK ~8 weeks for additional pieces|Y
01|223505|3|1|Delivery: 3-5 days after design is completed and|Y
01|223505|3|2|approved.|Y
01|223505|3|3|This item cannot be cancelled or returned once a PO is|Y
01|223505|3|4|placed.|Y
01|223518|5|1|Please Note: IMTS promotion 5% extra added to the|Y
01|223518|5|2|discount on the holder only.|Y
01|223526|2|1|inculdes interfaces/cables/install|Y
01|223531|2|1|INCLUDEDS INTERFACE/CABLES/INSTALL|Y
01|223534|2|1|Quoted at Net price|Y
01|223544|1|1|P/N: H63A-SF4-160MT|Y
01|223544|3|1|P/N: H63A-SF8-160MT|Y
01|223546|1|1|Additional 20% Overstock Promo discount applied. This|Y
01|223546|1|2|item cannot be cancelled or returned after receipt of|Y
01|223546|1|3|PO.|Y
01|223559|4|1|Chose either size vise|Y
01|223559|5|1|Choose either size vise|Y
01|223562|5|1|These are non-standard stock items and considered|Y
01|223562|5|2|specials. Once a PO has been issued items cannot be|Y
01|223562|5|3|cancelled or returned.|Y
01|223562|6|1|These are non-standard stock items and considered|Y
01|223562|6|2|specials. Once a PO has been issued items cannot be|Y
01|223562|6|3|cancelled or returned.|Y
01|223567|2|1|Please note this is special non-standard stock. It|Y
01|223567|2|2|cannot be cancelled or returned once a PO is placed.|Y
01|223567|3|1|Part# NBT30-SK20C-120P **quoted at NET price**|Y
01|223567|3|2|NBT30 DualContact Slim Chuck SK20 Coolant HiSpeed 25K|Y
01|223567|3|3|120mm GL|Y
01|223567|3|4|Please note: This item is a complete special. It cannot|Y
01|223567|3|5|be cancelled or returned once a PO is placed.|Y
01|223569|1|1|NBT30 Hydraulic Chuck 3mm. d2 = 14mmd3=18mm70mm GL|Y
01|223569|1|2|e|N
01|223569|2|1|NBT30 Hydraulic Chuck 4mm. d2 = 14mmd3=18mm70mm GL|Y
01|223569|3|1|NBT30 Hydraulic Chuck 5mm. d2 = 14mmd3=18mm70mm GL|Y
01|223569|4|1|NBT30 Hydraulic Chuck 6mm. d2 = 14mmd3=18mm70mm GL|Y
01|223569|5|1|NBT30 Hydraulic Chuck 8mm. d2 = 14mmd3=18mm70mm GL|Y
01|223569|6|1|NBT30 Hydraulic Chuck 10mm. d2 = 14mmd3=18mm70mm GL|Y
01|223584|5|1|We currently have 7 holders in stock and then they are|Y
01|223584|5|2|discontinued. I can offer C5006-0375-2.50 and have 10|Y
01|223584|5|3|in stock if you want a quote.|Y
01|223584|5|4|We can call the C50S6-0375-1.38 considered complete|Y
01|223584|5|5|for an order of 7.|Y
01|223590|5|1|Additional 5% IMTS Promo discount applied to holders|Y
01|223590|5|2|on Lines 1-4 only. Valid until 11/30/24 for DROP-SHIP|Y
01|223590|5|3|orders only.|Y
01|223594|1|1|Part# C5001-1000-250CP **quoted at NET price**|Y
01|223594|1|2|CAT50 Shell Mill Holder 1 CoolantPorts ChipHole 20K|Y
01|223594|1|3|250mm G/L 2.5@20K|Y
01|223594|2|1|Part# C5001-1000-300CP **Quoted at NET price**|Y
01|223594|2|2|CAT50 Shell Mill Holder 1 CoolantPorts ChipHole 20K|Y
01|223594|2|3|300mm G/L >>G2.5@20K|Y
01|223594|3|1|Part# C5001-25-250CP **quoted at NET price**|Y
01|223594|3|2|CAT50 Shell Mill Holder 25mm CoolantPorts ChipHole 20K|Y
01|223594|3|3|250mm G/L|Y
01|223594|4|1|Part# C5001-25-300CP **Quoted at NET price**|Y
01|223594|4|2|CAT50 Shell Mill Holder 25mm coolantPorts ChipHole 20K|Y
01|223594|4|3|300mm G/L|Y
01|223594|5|1|P/n: CAT50-C1.1/2-250U-IDU|Y
01|223594|5|2|CAT50 Milling Chuck 1.1/2 ChipHole 8K 250mm G/L|Y
01|223594|5|3|**Unable to sleeve down - we do not produce 1.1/2 KM|Y
01|223594|5|4|collets.|Y
01|223594|6|1|C5001-22-250|Y
01|223594|9|1|A tariff surcharge of 8% will be added to every order|Y
01|223594|9|2|placed after September 1st 2025(until further notice).|Y
01|223594|9|3|This surcharge will be acknowledged upon acceptance|Y
01|223594|9|4|of every order.|Y
01|223598|2|1|Please note additional 5% applied per IMTS promo.|Y
01|223600|1|1|RGA#LVR-61282/|Y
01|223600|1|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 20902100 04|Y
01|223600|1|3|(Mimatic#193643)|Y
01|223600|2|1|Bearings seals o-rings worn SK16 spindle and input|Y
01|223600|2|2|spindle to be replaced.|Y
01|223600|4|1|RGA#LVR-61282/|Y
01|223600|4|2|Repair of MNZ20-SK16X-ICE-12K s/n: 20905017 02|Y
01|223600|4|3|(Mimatic#193568)|Y
01|223600|5|1|Bearings seals o-rings and worn SK16 spindle to be|Y
01|223600|5|2|replaced.|Y
01|223600|7|1|RGA#LVR-61282/|Y
01|223600|7|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 20905241 02|Y
01|223600|7|3|(Mimatic#193643)|Y
01|223600|8|1|Bearings seals o-rings and worn SK16 spindle to be|Y
01|223600|8|2|replaced.|Y
01|223600|10|1|RGA#LVR-61282/|Y
01|223600|10|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 20905241 16|Y
01|223600|10|3|(Mimatic#193643)|Y
01|223600|11|1|Bearings seals o-rings and worn SK16 spindle to be|Y
01|223600|11|2|replaced.|Y
01|223606|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|223607|1|1|Part#: HSK63A-1500-4.50|Y
01|223607|1|2|HSK63A End Mill Holder 1.1/2 ChipHole 25K|Y
01|223607|1|3|Qty Breaks:|Y
01|223607|1|4|10+ Pcs: $352/EA|Y
01|223614|6|1|Additional 10% discount applied for 2024 IMTS Promotion|Y
01|223614|6|2|for Advanced Tooling.  If List falls below $5000 we|Y
01|223614|6|3|can only apply an additional 5% discount.|Y
01|223615|5|1|Please Note: Extra 10% has been added on to these|Y
01|223615|5|2|toolholders. Customer must have $5000.00 list or|Y
01|223615|5|3|or higher to maintain the 45% discount. This promotion|Y
01|223615|5|4|is good until November 29 2024.|Y
01|223618|1|1|RGA#TOR-61320/|Y
01|223618|1|2|Repair of S20-UMT|Y
01|223618|3|1|Calibration service included.|Y
01|223621|8|1|Additional 5% discount has been added to the standard|Y
01|223621|8|2|35% discount for advance holders|Y
01|223644|8|1|P/N: C4QC-SF12-49|Y
01|223644|9|1|P/N: C4QC-SF14-49|Y
01|223644|10|1|P/N: C4QC-SF16-54|Y
01|223644|11|1|P/N: C4QC-SF8-49|Y
01|223660|1|1|RGA#LVR-61317/|Y
01|223660|1|2|Repair of OKL3-ER32X s/n: AL0447 (Alps#OK101-14000)|Y
01|223660|2|1|Bearings o-rings and collet nut to be replaced.|Y
01|223660|4|1|RGA#LVR-61317/|Y
01|223660|4|2|Repair of OKL3-ER32X s/n: AL0436 (Alps#OK101-14000)|Y
01|223660|5|1|Bearings o-rings collet nut bolt and parts around it|Y
01|223660|5|2|to be replaced.|Y
01|223668|1|1|*Expecting lots more later we will discuss discount|Y
01|223668|1|2|then.|Y
01|223669|4|1|Please note: IMTS24 promo 10% extra has been added to|Y
01|223669|4|2|the discount on this quote. Promotion ends 11/27/2024|Y
01|223671|1|1|RGA#TOR-61329/|Y
01|223671|1|2|Repair of PF-2|Y
01|223671|4|1|Calibration service included|Y
01|223672|3|1|SHANK: BMT68|Y
01|223672|3|2|TOOLING INTERFACE: MIMATIC MI40 QUICK CHANGE|Y
01|223672|3|3|COOLANT: INTERNAL THRU SPINDLE & EXTERNAL THRU PIPING|Y
01|223672|3|4|ROTATION: OUTPUT IS REVERSAL TO INPUT|Y
01|223672|3|5|CENTER HEIGHT: 80MM|Y
01|223672|3|6|GEAR RATIO: 1:2 (6500 INPUT = 13000 OUTPUT)|Y
01|223672|3|7|DRAWING # 00063776|Y
01|223672|3|8|TOOL WEIGHT: APPROX. 8.5 KG|Y
01|223673|3|1|SHANK: BMT68|Y
01|223673|3|2|TOOLING INTERFACE: HYDRO-FLEX 20 HOLDER SYSTEM|Y
01|223673|3|3|COOLANT: INTERNAL THRU SPINDLE & EXTERNAL THRU PIPING|Y
01|223673|3|4|ROTATION: OUTPUT IS REVERSAL TO INPUT|Y
01|223673|3|5|CENTER HEIGHT: 80MM|Y
01|223673|3|6|GEAR RATIO: 1:2 (6500 INPUT = 13000 OUTPUT)|Y
01|223673|3|7|DRAWING # 00063776-C3|Y
01|223673|3|8|TOOL WEIGHT: APPROX. 8.5 KG|Y
01|223675|1|1|CNC180FA-M SN:15663|Y
01|223675|1|2|RGA#TAR-61334|Y
01|223677|10|1|Please note: Extra 10% added to the discount on this|Y
01|223677|10|2|quote. If order goes under $5000.00 list price|Y
01|223677|10|3|disocunt will be 27%.|Y
01|223681|2|1|Please Note: IMTS24 promotion 5% extra added to the|Y
01|223681|2|2|discount for the HSK63A-SK10C-105-IDU.|Y
01|223681|2|3|Please e-mail me the order to me so we can make sure|Y
01|223681|2|4|the promo is applied to the holder.|Y
01|223689|1|1|4 STOCK/2 PIECES-6 WEEK DELIVERY|Y
01|223698|6|1|IMTS24 Promotion: Get a $1000.00 tooling certificate|Y
01|223698|6|2|with the purchase of a START2 unit.|Y
01|223710|7|1|A tariff surcharge of 8% will be added to every order|Y
01|223710|7|2|placed after September 1st 2025(until further notice).|Y
01|223710|7|3|This surcharge will be acknowledged upon acceptance|Y
01|223710|7|4|of every order.|Y
01|223711|2|1|Please note additional 5% applied per IMTS promo.|Y
01|223718|1|1|P/N: NBT40-SF0312-3.54CP|Y
01|223718|1|2|Dual Contact BT40 taper 5/16 shrink fit holder with|Y
01|223718|1|3|3.54 gauge length and coolant ports.|Y
01|223718|3|1|P/N: NBT40-SF10-90CP|Y
01|223718|3|2|Dual Contact BT40 Taper 10mm Shrink Fit holder with|Y
01|223718|3|3|90mm gauge length and coolant ports|Y
01|223718|5|1|P/N: NBT40-SF12-90CP|Y
01|223718|5|2|Dual Contact BT40 taper 12mm Shrink Fit holder with|Y
01|223718|5|3|90mm gauge length and coolant ports|Y
01|223718|7|1|P/N: NBT40-SF16-90CP|Y
01|223718|7|2|Dual Contact BT40 Taper 16mm Shrink Fit holder with|Y
01|223718|7|3|90mm gauge length and coolant ports|Y
01|223718|9|1|P/N: NBT40-SF20-90CP|Y
01|223718|9|2|Dual Contact BT40 Taper 20mm Shrink Fit holder with|Y
01|223718|9|3|90mm gauge length and coolant ports|Y
01|223722|1|1|BT40-HC20-90|Y
01|223722|1|2|Net Price for Afilados Intertool|Y
01|223722|2|1|Bt40-HC16-90|Y
01|223722|2|2|Net Price for afilados Intertool|Y
01|223722|3|1|BT40-HC10-90|Y
01|223722|3|2|Net Price for afilados Intertool|Y
01|223722|4|1|BT40-HC6-90|Y
01|223722|4|2|Net Price for Afilados Intertool|Y
01|223722|5|1|BT40-HC12-90|Y
01|223722|5|2|Net Price for Afilados Intertool|Y
01|223722|15|1|HSK63A-HC32-125|Y
01|223722|15|2|Net price for Afilados|Y
01|223726|1|1|These are custom application units. Application must be|Y
01|223726|1|2|approved. Once a PO has been issued these cannot be|Y
01|223726|1|3|cancelled or returned. 6 week delivery upon approval|Y
01|223726|1|4|drawing signed.|Y
01|223726|2|1|Lyndex-Nikken can make positioning block upon receipt|Y
01|223726|2|2|of spindle drawing information.|Y
01|223742|1|1|TOOL #1|Y
01|223742|2|1|TOOL #5|Y
01|223742|3|1|TOOL #3|Y
01|223742|4|1|TOOL #7|Y
01|223742|5|1|TOOL #9|Y
01|223742|6|1|TOOL #11|Y
01|223743|1|1|TOOL #2|Y
01|223743|2|1|TOOL #4|Y
01|223743|3|1|TOOL #17|Y
01|223743|4|1|TOOL #8|Y
01|223743|5|1|TOOL #13|Y
01|223743|6|1|TOOL #9|Y
01|223743|7|1|COLLET FOR TOOL #9|Y
01|223743|8|1|TOOL #11|Y
01|223743|9|1|COLLET FOR TOOL #11|Y
01|223743|10|1|TOOL #12|Y
01|223743|11|1|TOOL #14|Y
01|223743|12|1|COLLET FOR TOOL #14|Y
01|223743|13|1|TOOL #15|Y
01|223743|14|1|TOOL #20|Y
01|223743|15|1|COLLET FOR TOOL #20|Y
01|223743|16|1|TOOL #16|Y
01|223743|17|1|COLLET FOR HOLDING 1/2 EXTENION ON TOOL #16|Y
01|223743|18|1|EXTENSION FOR TOOL #16|Y
01|223743|19|1|COLLET FOR DRILL IN EXTENSION FOR TOOL #16|Y
01|223744|2|1|Additional 20% Overstock promo discount applied. This|Y
01|223744|2|2|item cannot be cancelled or returned after receipt of|Y
01|223744|2|3|PO.|Y
01|223744|3|1|Valid only for NC5037-0020-8.00|Y
01|223749|2|1|Please note additional 20% discount applied per|Y
01|223749|2|2|overstock promo. These items cannot be cancelled or|Y
01|223749|2|3|returned upon receipt of PO/order.|Y
01|223752|1|1|IMTS PROMO 5% ADDITIONAL DISCOUNT|Y
01|223758|1|1|With Booster/Scale RCN8591F Mount Kit|Y
01|223758|1|2|Delivery Term: 7months (5mo mfg + Shipping 2mo)|Y
01|223758|1|3|Special order item. Cannot accept cancellations once|Y
01|223758|1|4|we have received your PO.|Y
01|223758|2|1|Angle Plate (Equrre) for CNC1201FA-M|Y
01|223758|3|1|NOTE: Shibaura will provide interfaces.(AMP/Cables/|Y
01|223758|3|2|FiberOptic/Hardwares & etc.)|Y
01|223758|3|3|L-N x2 persons will install the R/Table and Angleplate.|Y
01|223758|3|4|2days installation service at Miba Industrial Bearings|Y
01|223758|3|5|(Grafton WI)|Y
01|223763|4|1|Standard holder in Japan stock.Swap with high speed nut|Y
01|223773|1|1|One unit is in stock in our warehouse the other one|Y
01|223773|1|2|will take 2-3 months to deliver.|Y
01|223773|2|1|Installation service for 5AX-201FA-M-AHB x2 units.|Y
01|223773|2|2|Special price for 2units installed in one service.|Y
01|223773|2|3|NOTE: We aren't involved in the installation of the|Y
01|223773|2|4|Fixtures.|Y
01|223781|2|1|Additional 5% discount has been applied for the 2024|Y
01|223781|2|2|IMTS Promotion.|Y
01|223785|13|1|List= $2720|Y
01|223785|13|2|Promotion applied to this item in lieu of TC|Y
01|223790|1|1|DIN HOLES WILL BE PLUGGED BY SERVICE|Y
01|223791|1|1|RGA#TOR-61270/|Y
01|223791|1|2|Repair of PF-2|Y
01|223791|2|1|This tool was received without batteries|Y
01|223791|3|1|Calibration service included.|Y
01|223799|4|1|only avail 4.5 gl|Y
01|223799|5|1|only avail 4 gl|Y
01|223802|1|1|Quoted at NET price.|Y
01|223807|5|1|10% ADDITIONAL PROMO DISCOUNT FOR OVER $5K LIST PRICE|Y
01|223811|1|1|Includes: 1000mm rotary table with Nikken AR21 control|Y
01|223811|2|1|Pump not required if the brake is not in use.|Y
01|223811|3|1|heidenhain glass Scale +/- 2 arc seconds|Y
01|223814|13|1|HSK40A-C20-100|Y
01|223815|2|1|*Cross for WES1B 3/8|Y
01|223815|3|1|*Cross for WES1B 3/8 with coolant slots|Y
01|223816|7|1|Overstock Discount extra 20% non returnable.|Y
01|223817|1|1|Part Number: NCAT40-SF4-80|Y
01|223817|1|2|NCAT40 DualContact Shrink Fit Holder 4mm 25K 80mm G/L|Y
01|223817|1|3|Quantity Breaks: (NET Price)|Y
01|223817|1|4|5+ Pcs: $285/EA|Y
01|223817|1|5|10+ Pcs: $190/EA|Y
01|223817|1|6|*Please allow 1-2 weeks for Approval Drawing. Lead time|Y
01|223817|1|7|given as ADA - after signed drawing approval.|Y
01|223817|2|1|Part Number: NCAT40-SF5-80|Y
01|223817|2|2|NCAT40 DualContact Shrink Fit Holder 5mm 25K 80mm G/L|Y
01|223817|2|3|Quantity Breaks: (NET Price)|Y
01|223817|2|4|5+ Pcs: $285/EA|Y
01|223817|2|5|10+ Pcs: $190/EA|Y
01|223817|2|6|*Please allow 1-2 weeks for Approval Drawing. Lead time|Y
01|223817|2|7|given as ADA - after signed drawing approval.|Y
01|223820|1|1|Additional 10% IMTS Promo discount applied. Valid until|Y
01|223820|1|2|11/30/24 for drop-ship orders only.|Y
01|223835|4|1|IMTS24 Promotion 5% extra added to the discount for the|Y
01|223835|4|2|HSK63A-SK16-105-IDU.|Y
01|223836|7|1|EZ-ACART-1000 with mounting for CRX5|Y
01|223836|7|2|Includes 2 grid for 100pcs layout|Y
01|223836|11|1|Northfield Model 450 4'' DIA Air Chuck Only|Y
01|223836|11|2|(.0001'' / 2.54u TIR) AIR TUBE-DRY-STD ADAPTER PLATE|Y
01|223854|1|1|T/P Inspection Required|Y
01|223854|2|1|T/P Inspection Required|Y
01|223854|3|1|T/P Inspection Required|Y
01|223854|4|1|Part of 1st batch/BOAT#242570202(ETA12/2)arrives 1st.|N
01|223860|1|1|ER40 Attachment|Y
01|223860|2|1|Torque Wrench|Y
01|223861|5|1|3 Port Manifold--2 Standard / 1 with Pressure reducer|Y
01|223861|5|2|plus check valve.|Y
01|223861|16|1|** #1 - This is Option #1 and is for installing a|Y
01|223861|16|2|normal rotary installation - 1 axis installation|Y
01|223861|19|1|** #2 - This is Option#2 for installation - which will|Y
01|223861|19|2|include the standard rotary axis installation with an|Y
01|223861|19|3|additional (linear) axis also interfaced and made ready|Y
01|223861|19|4|for Ahaus to install the servo and tail support|Y
01|223861|19|5|positioning solution.  Lyndex will only install axis|Y
01|223861|19|6|and Ahaus will be responsible for hooking up the servo|Y
01|223861|19|7|and any other components needed for the solution.  We|Y
01|223861|19|8|will provide the axis active and accessible for Ahaus.|Y
01|223861|24|1|Cylinder for Tail Support Side - TAT-250.|Y
01|223861|25|1|Customer is responsible for supplying any dimensional|Y
01|223861|25|2|information needed.|Y
01|223861|26|1|Adapter Plate for mounting cylinder to TAT-250.|Y
01|223870|4|1|Additional 5% discount applied for the Milling Chuck|Y
01|223870|4|2|only for the 2024 IMTS Promotion for Advanced|Y
01|223870|4|3|Toolholders.|Y
01|223875|1|1|RGA#LVR-61296/|Y
01|223875|1|2|Repair of MZMP5-ER40X-OFF-ICE s/n:59664 03|Y
01|223875|1|3|(Mimatic#131556)|Y
01|223875|2|1|Bearings seals and o-rings to be replaced.|Y
01|223888|1|1|Final Part# C4006-0750-4.00DIN **Quoted at NET Price**|Y
01|223888|1|2|CAT40 End Mill Holder 3/4 25K w/ 2-hole DIN|Y
01|223888|1|3|Net price includes holder and modification fee.|Y
01|223888|1|4|Once a PO is placed this item cannot be cancelled or|Y
01|223888|1|5|returned.|Y
01|223909|4|1|List Price = $9500|Y
01|223915|1|1|No need INS.|Y
01|223915|2|1|No need Ins.|Y
01|223916|2|1|Same as above 10 pieces|Y
01|223919|1|1|RGA#LVR-61321/|Y
01|223919|1|2|Repair of MNL12-ER25Z-MSD s/n: A0068 (Alps#MSA01-6L000)|Y
01|223919|2|1|Bearings o-rings collet nut spindle and gears to be|Y
01|223919|2|2|replaced.|Y
01|223922|1|1|P/N: CAT40-SF0750-9.00|Y
01|223922|1|2|CAT40 taper 3/4 shrink fit holder with 9.00 gauge|Y
01|223922|1|3|length in front of the flange . Drawings provided.|Y
01|223922|3|1|P/N: HSK63A-SF0750-9.00|Y
01|223922|3|2|HSK63A Taper 3/4 Shrink Fit Holder with 9.00 gauge|Y
01|223922|3|3|length in front of the flange. Drawings provided.|Y
01|223930|9|1|SK50-SF12-160|Y
01|223930|9|2|SK50 12mm shrink fit 160mm GL Coolant Thru|Y
01|223930|9|3|Quoted at NET price.|Y
01|223930|10|1|SK50-SF12-200|Y
01|223930|10|2|SK50 12mm Shrink Fit holder 200mm GL Coolant Thru|Y
01|223930|10|3|Quoted at NET price.|Y
01|223931|1|1|P/N: CAT50-SF0375-4.13|Y
01|223931|1|2|CAT50 Taper 3/8 Shrink Fit Holder with 4.13 gauge|Y
01|223931|1|3|length - without coolant ports|Y
01|223931|2|1|P/N: CAT50-SF0375-4.00|Y
01|223931|2|2|CAT50 taper 3/8 shrink fit holder with 4.00 gauge|Y
01|223931|2|3|length - without coolant ports|Y
01|223931|6|1|P/N: CAT50-SF0375-4.13CP|Y
01|223931|6|2|CAT50 taper 3/8 shrink fit holder with 4.13 gauge|Y
01|223931|6|3|length - with coolant ports|Y
01|223931|7|1|P/N: CAT50-SF0375-4.00CP|Y
01|223931|7|2|CAT50 taper 3/8 shrink fit holder with 4.00 gauge|Y
01|223931|7|3|length - with coolant ports|Y
01|223940|1|1|Replaces part# C40S6-0625-1.75|Y
01|223946|4|1|H63A-SF4-80|Y
01|223946|4|2|Net Price for SST|Y
01|223946|5|1|H63A-SF3-80|Y
01|223946|5|2|Net price for SST|Y
01|223946|13|1|HSK63A-HC6-70|Y
01|223946|13|2|Net price for SST|Y
01|223946|14|1|HSK63A-HC8-70|Y
01|223946|14|2|Net Price for SST|Y
01|223946|15|1|HSK63A-HC10-80|Y
01|223946|15|2|Net Price for SST|Y
01|223946|28|1|cat40-hc6-68|Y
01|223946|28|2|Net Price for SST|Y
01|223946|29|1|cat40-hc8-68|Y
01|223946|29|2|Net Price SST|Y
01|223946|30|1|cat40-hc10-72|Y
01|223946|30|2|Net Price for SST|Y
01|223948|2|1|Item can't be cancelled or returned once PO is recieved|Y
01|223955|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|223960|1|1|CNCZ321LOSP54-M SN:N/A|Y
01|223960|2|1|CNCZ321LOSP54-M SN:N/A|Y
01|223969|1|1|P/N: NBT40-SF0625-2.76RT|Y
01|223969|1|2|Dual Contact BT40 5/8 shrink fit holder with 2.76|Y
01|223969|1|3|gauge length Rigid Type|Y
01|223969|3|1|P/N: NBT40-SF0625-2.76RT|Y
01|223969|3|2|SAME AS ABOVE BUT QTY BREAK|Y
01|223969|4|1|P/N: NBT40-SF16-70|Y
01|223969|4|2|Dual Contact BT40 taper 16mm shrink fit holder with|Y
01|223969|4|3|70mm gauge length WITHOUT Coolant Ports|Y
01|223969|6|1|P/N: NBT40-SF16-70|Y
01|223969|6|2|SAME AS ABOVE BUT QTY BREAK|Y
01|223976|13|1|$1000 Tooling Credit with purchase of Start2|Y
01|223976|13|2|$1500 Tooling Credit with purchase of FI6|Y
01|223976|13|3|Promotion ends 11/30/2024.  Valid on list price.|Y
01|223985|3|1|This is a NET charge for installing two tables per|Y
01|223985|3|2|machine.|Y
01|223987|1|1|Req.INS/Alignment|Y
01|223987|2|1|1st Batch|Y
01|223993|6|1|10% additonal discount added to your standard 34%|Y
01|223993|6|2|Discount promo is based on $5K+ list price order|Y
01|223993|6|3|If order falls under 5K discount will change to 5%|Y
01|223993|6|4|additional.  Promo expires 11/30|Y
01|223995|1|1|NCAT40-SF4-100|Y
01|223995|1|2|NCAT40 DualContact Shrink-Fit Holder 4mm G/l: 100mm|Y
01|223995|2|1|NCAT40-SF5-100|Y
01|223995|2|2|NCAT40 DualContact Shrink-Fit Holder 5mm G/l: 100mm|Y
01|223995|3|1|NCAT40-SF6-100CP|Y
01|223995|3|2|NCAT40 DualContact Shrink-Fit Holder 6mm G/l: 100mm|Y
01|223995|3|3|CoolantPorts|Y
01|223995|4|1|NCAT40-SF8-100CP|Y
01|223995|4|2|NCAT40 DualContact Shrink-Fit Holder 8mm G/l: 100mm|Y
01|223995|4|3|CoolantPorts|Y
01|223995|5|1|NCAT40-SF10-100CP|Y
01|223995|5|2|NCAT40 DualContact Shrink-Fit Holder 10mm G/l: 100mm|Y
01|223995|5|3|CoolantPorts|Y
01|223995|6|1|NCAT40-SF12-100CP|Y
01|223995|6|2|NCAT40 DualContact Shrink-Fit Holder 12mm G/l: 100mm|Y
01|223995|6|3|CoolantPorts|Y
01|223995|7|1|NCAT40-SF14-100CP|Y
01|223995|7|2|NCAT40 DualContact Shrink-Fit Holder 14mm G/l: 100mm|Y
01|223995|7|3|CoolantPorts|Y
01|223995|8|1|NCAT40-SF16-100CP|Y
01|223995|8|2|NCAT40 DualContact Shrink-Fit Holder 16mm G/l: 100mm|Y
01|223995|8|3|CoolantPorts|Y
01|223995|9|1|NC4004-0002-2.36|Y
01|223995|9|2|NCAT40 DualContact Morse Taper MT2 Adapter|Y
01|223995|9|3|*Minimum Order Quantity of 10 Pcs|Y
01|223995|10|1|NC4004-0003-3.00|Y
01|223995|10|2|NCAT40 DualContact Morse Taper MT3 Adapter|Y
01|223995|10|3|*Minimum Order Quantity of 10 pcs|Y
01|223995|11|1|NC4004-0004-3.54|Y
01|223995|11|2|NCAT40 DualContact Morse Taper MT4|Y
01|223995|11|3|*Minimum Order Quantity of 10 pcs|Y
01|223995|12|1|NC4001-0750-6.00CP|Y
01|223995|12|2|NCAT40 DualContact Shell Mill Holder 3/4 CoolantPorts|Y
01|223995|12|3|25K 6 G/l|Y
01|223995|13|1|NC4001-1000-6.00CP|Y
01|223995|13|2|NCAT40 DualContact Shell Mill Holder 1 CoolantPorts|Y
01|223995|13|3|25K 6 G/l|Y
01|223997|5|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|223997|5|2|of spindle drawing information|Y
01|223997|5|3|*net price|Y
01|224000|47|1|A tariff surcharge of 8% will be added to every order|Y
01|224000|47|2|placed after September 1st 2025(until further notice).|Y
01|224000|47|3|This surcharge will be acknowledged upon acceptance|Y
01|224000|47|4|of every order.|Y
01|224003|1|1|Placeholder for C5006-0500-4.00DIN-M...|Y
01|224003|1|2|These are non-standard stock items and considered|Y
01|224003|1|3|specials. Once a PO has been issued these items|Y
01|224003|1|4|cannot be cancelled or returned.|Y
01|224006|1|1|HSK40A-C25-100|Y
01|224008|1|1|This is a net charge for Lyndex Nikken to install an|Y
01|224008|1|2|existing CNC180FA-M table on a Campro or DMC VMC.|Y
01|224008|1|3|Customer is responsible for any options needed on VMC|Y
01|224008|1|4|to enable rotary integration.  Lyndex will supply axis|Y
01|224008|1|5|card if needed and other installation components.|Y
01|224012|1|1|Part# BT50-FMH31.75-76-45|Y
01|224012|1|2|This item is special non-standard stock. It cannot be|Y
01|224012|1|3|cancelled or returned after a PO is placed.|Y
01|224017|4|1|A tariff surcharge may be added to this quotation in|Y
01|224017|4|2|the event of a sustained tariff increase on the|Y
01|224017|4|3|importation of this product.  Any surcharge will be|Y
01|224017|4|4|disclosed prior to acceptance of an order.|Y
01|224058|1|1|H63TH-DCLNL-DX12|Y
01|224058|2|1|H63TH-DCMNN-L12|Y
01|224058|3|1|H63TH-DDNNN-L15|Y
01|224058|4|1|H63TH-PRDCN-H15 (12?)|Y
01|224058|5|1|H63TH-SVVBN-L16|Y
01|224058|6|1|H63TH-A25KDCLNR12|Y
01|224058|7|1|H63TH-A32LDCLNR12|Y
01|224058|8|1|H63TH-MMTER-DX16|Y
01|224058|9|1|H63TH-MMTENR-L16|Y
01|224058|10|1|H63TH-DCLNL-L12-3|Y
01|224058|11|1|H63TH-DDJNL-L15-3|Y
01|224072|1|1|168539|Y
01|224072|1|2|Non-cancellable Non-returnable|Y
01|224079|1|1|HSK63A-SK25C-135P-J-IDU|Y
01|224079|1|2|HSK63A Slim Chuck SK25 Coolant JetSlotNut HiSpeed|Y
01|224079|2|1|HSK63A-SK25C-135-J-IDU|Y
01|224079|2|2|HSK63A Slim Chuck SK25 Coolant JetSlotNut 10K|Y
01|224082|1|1|Lyndex-Nikken Part # TBD / Mimatic #198262|Y
01|224082|1|2|BMT85 Live ER50 X<Radial>STRT Internal/External Coolant|Y
01|224082|1|3|7MP >> 6K|Y
01|224082|1|4|Lyndex-Nikken Part # BMT85-ER50X-ICE|Y
01|224082|2|1|Lyndex-Nikken Part # TBD / Mimatic #196810|Y
01|224082|2|2|BMT85 Live ER50 Z<Axial>90 Degree Internal/External|Y
01|224082|2|3|Coolant  7MP >> Hi Speed 6K Center Height 85mm.|Y
01|224082|2|4|Lyndex-Nikken Part # BMT85-ER50Z-ICE-85|Y
01|224090|1|1|Req.INS/T/P Inspection Required11/8A|Y
01|224090|2|1|Req.INS/T/P Inspection Required/993456|Y
01|224095|1|1|P/N# TBD Ref# 168539|Y
01|224095|1|2|Okuma BMT60 Live ER32 Z-Axis 90-degree Main/Sub ExtCool|Y
01|224095|1|3|w/ Internal Nut  6.5K rpm|Y
01|224095|1|4|*Non-cancellable/Non-returnable. Quoted at NET pricing|Y
01|224096|1|1|Please note placeholder for C4001-22-100CP.|Y
01|224096|1|2|These are non-standard stock items and considered|Y
01|224096|1|3|specials. Once a PO has been issued these items cannot|Y
01|224096|1|4|be cancelled or returned. 6 weeks mtfg. upon signed|Y
01|224096|1|5|approval drawing plus 2 weeks delivery.|Y
01|224099|6|1|$1000 free tooling with purchase of shrink-fit machine|Y
01|224104|4|1|Additional 5% discount applied for the 2024 IMTS|Y
01|224104|4|2|Promotion for Advanced Toolholders.|Y
01|224107|1|1|NCAT50-SK20C-105U-IDU|Y
01|224107|1|2|NCAT50 DualContact Slim Chuck SK20 Coolant BuiltInChip|Y
01|224112|4|1|*This item qualifies for the additional 20% discount|Y
01|224112|4|2|under the OVERSTOCK  promo. This is final sale.|Y
01|224114|1|1|P/N# TBD Ref# 168539|Y
01|224114|1|2|Okuma BMT60 Live ER32 Z-Axis 90-degree Main/Sub ExtCool|Y
01|224114|1|3|w/ Internal Nut  6.5K rpm|Y
01|224114|1|4|*Non-cancellable/Non-returnable. Quoted at NET pricing|Y
01|224114|5|1|This item qualifies for Overstock discount additional|Y
01|224114|5|2|discount has been added. Final sale|Y
01|224114|5|3|#190675|Y
01|224114|9|1|#167718|Y
01|224115|2|1|Installation includes: Drive unit short bar fiber|Y
01|224115|2|2|optic cable communications cable bulkhead cables|Y
01|224115|2|3|external cables parameter changes service time and|Y
01|224115|2|4|travel.|Y
01|224120|1|1|1st Batch|Y
01|224120|2|1|Req.INS/Check if there is WRENCH|Y
01|224120|3|1|1st Batch/972637 Triumph/Linemar 6/25:APRVD|Y
01|224120|4|1|1st Batch|Y
01|224130|2|1|Please note additional 10% applied per IMTS promo.|Y
01|224132|1|1|This item is considered special non-standard stock.|Y
01|224132|1|2|It cannot be cancelled or returned upon receipt of a PO|Y
01|224140|1|1|CAT50-HC1500-4.13|Y
01|224140|1|2|CAT50 Hydraulic Chuck 1.1/2 8K 105mm G/l|Y
01|224144|1|1|P/N: CAT50-SF0375-4.13-IDI|Y
01|224144|1|2|CAT50 taper 3/8 shrink fit holder with 4.13 gauge|Y
01|224144|1|3|length and Factory installed Balluff Chip|Y
01|224144|1|4|P/N: BIS-C-122-04/L|Y
01|224144|2|1|P/N: CAT50-SF0375-4.00-IDI|Y
01|224144|2|2|CAT50 taper 3/8 shrink fit holder with 4.00 gauge|Y
01|224144|2|3|length With Factory installed Balluff Chip|Y
01|224144|2|4|P/N: BIS-C-122-04/L|Y
01|224144|4|1|P/N: CAT50-SF0375-4.13CP-IDI|Y
01|224144|4|2|CAT50 taper 3/8 shrink fit holder with 4.13 gauge|Y
01|224144|4|3|length and with Coolant ports. Also includes Factory|Y
01|224144|4|4|installed Balluff Chip P/N: BIS-C-122-04/L|Y
01|224144|5|1|P/N: CAT50-SF0375-4.00CP-IDI|Y
01|224144|5|2|CAT50 taper 3/8 shrink fit holder with 4.00 gauge|Y
01|224144|5|3|length With Coolant Ports. Also included is Factory|Y
01|224144|5|4|installed Balluff Chip P/N: BIS-C-122-04/L|Y
01|224160|7|1|Installation includes: Drive unit short bar fiber|Y
01|224160|7|2|optic cable commnications cable bulkhead cables|Y
01|224160|7|3|external cables parameter changes service time and|Y
01|224160|7|4|travel.|Y
01|224163|2|1|Please note additional 10% applied per IMTS promo.|Y
01|224171|2|1|All sales are final!|Y
01|224172|1|1|P/N: NC4001-0750-1.75CPDIN-M|Y
01|224172|1|2|Dual Contact CAT40 3/4 Shell Mill Holder with|Y
01|224172|1|3|1.75 gauge length coolant ports DIN Modified|Y
01|224172|3|1|P/N: CAT40-ER16-2.76DIN-M|Y
01|224172|3|2|CAT40 taper ER16 Collet Chuck with 2.76 gauge length|Y
01|224172|3|3|DIN Modified.|Y
01|224172|6|1|P/N: CAT40-ER32-2.76DIN-M|Y
01|224172|6|2|CAT40 taper ER32 Collet Chuck with 2.76 gauge length|Y
01|224172|6|3|DIN Modified|Y
01|224172|7|1|P/N: NCAT40-C1-85U-IDU-DIN-M|Y
01|224172|7|2|Dual Contact CAT40 taper 1 Milling Chuck with|Y
01|224172|7|3|85mm gauge length DIN Modified|Y
01|224173|2|1|Additional 5% discount applied for 2024 IMTS Promotion|Y
01|224173|2|2|for Advanced Toolholders.|Y
01|224175|1|1|INS Req'd:989837/Buckeye/HitachiAstemo(AmericanShowa)|Y
01|224183|3|1|Additional 20% Overstock Promo discount applied. This|Y
01|224183|3|2|item cannot be cancelled or returned.|Y
01|224183|4|1|Applicable for QCFC80-EMR-RING only.|Y
01|224185|1|1|IMTS 5% additional discount promo|Y
01|224199|1|1|SPECIAL DISCOUNT - STANDARD IS 30%|Y
01|224201|1|1|Installation includes: Drive unit short bar fiber|Y
01|224201|1|2|optic cable communications cable bulkhead cables|Y
01|224201|1|3|parameter changes service time and travel.|Y
01|224203|1|1|Custom Hydromat HW25 Collet: HDI-P TZ (3/8)|Y
01|224203|1|2|Minimum order Quantity 3 pcs|Y
01|224203|1|3|Net Price for MMC|Y
01|224203|2|1|Custom Hydromat HW25 Collet: HDI TZ (3/8)|Y
01|224203|2|2|Minimum order quantity 3 pcs|Y
01|224203|2|3|Net price for MMC|Y
01|224203|3|1|Custom Hydromat HW25 Collet: HDI TZ (1/2)|Y
01|224203|3|2|Minimum Quantity Order 3 pcs|Y
01|224203|3|3|Net price for MMC|Y
01|224203|4|1|Custom Hydromat HW25 Collet: HDI-P TZ (1/2)|Y
01|224203|4|2|Minimum Quantity Order 3 pcs|Y
01|224203|4|3|Net price for MMC|Y
01|224222|1|1|RGA#LVR-61298/|Y
01|224222|1|2|Repair of MNL12-ER32Z-MS s/n: A1830 (Alps#T32216)|Y
01|224222|2|1|Bearings o-rings collet nut & spindle to be replaced|Y
01|224222|4|1|RGA#LVR-61298/|Y
01|224222|4|2|Repair of MNL12-ER32Z-MS s/n: A1858 (Alps#T32216)|Y
01|224222|5|1|Bearings o-rings collet nut & spindle to be replaced|Y
01|224222|6|1|A tariff surcharge of 8% will be added to every order|Y
01|224222|6|2|placed after September 1st 2025(until further notice).|Y
01|224222|6|3|This surcharge will be acknowledged upon acceptance|Y
01|224222|6|4|of every order.|Y
01|224225|2|1|Please note additional 5% applied per IMTS promo.|Y
01|224229|1|1|RGA#LVR-61353/|Y
01|224229|1|2|Repair of MNL12-ER32Z-MS-10K s/n: A0049|Y
01|224229|1|3|(Alps#MSA01-3W000S)|Y
01|224229|2|1|Bearings o-rings and collet nut to be replaced.|Y
01|224243|13|1|$1000 Tooling Credit with purchase of START2|Y
01|224243|13|2|$1500 Tooling credit with purchase of Fi6|Y
01|224243|13|3|Promo ends 11/30. Valid on list price|Y
01|224251|3|1|Part#: C50RAM-ER40-215IC-100TP *TBD|Y
01|224251|3|2|CAT50 AngleHead ER40 110mm Pitch Tapered Pin|Y
01|224251|3|3|CTS Coolant Thru AH. NET Price.|Y
01|224251|3|4|Dimensions: A=110mm D=28mm Tooling interface: ER40|Y
01|224251|3|5|Reversal of rotation Length; L=230-235mm L1=105mm TBD|Y
01|224251|3|6|360 degree adjustable Gear Ratio: 1:1|Y
01|224251|3|7|Max Coolant Pressure: 70 bar Max Torque: 150Nm|Y
01|224251|3|8|Wrenches: ER40I + WRENCH-MIM-107566|Y
01|224251|3|9|Lead time: 3 Weeks Design 12 weeks after signed|Y
01|224251|3|10|approval drawing.|Y
01|224257|2|1|HFO  Midwest to supply Yaskawa Sigma 7 motors.|Y
01|224257|2|2|Motors to be shipped to Mundelein for assembly|Y
01|224257|2|3|HFO responsible for field installation|Y
01|224257|2|4|Duplicate project for export to MX|Y
01|224259|20|1|Please Note: This is special non-stanadard stock.|Y
01|224259|20|2|This item cannot be cancelled or returned.|Y
01|224259|21|1|Please Note: This is special non-standard stock.|Y
01|224259|21|2|This item cannot be cancelled or returned.|Y
01|224265|29|1|A tariff surcharge of 8% will be added to every order|Y
01|224265|29|2|placed after September 1st 2025(until further notice).|Y
01|224265|29|3|This surcharge will be acknowledged upon acceptance|Y
01|224265|29|4|of every order.|Y
01|224270|1|1|Part#: ST25M-SF16-160 **Quoted at NET price**|Y
01|224270|1|2|25mm Straight Shank Extension Shrink Fit Holder 16mm|Y
01|224270|1|3|QTY BREAK NET PRICING:|Y
01|224270|1|4|1-4 pcs:|Y
01|224270|1|5|5-9 pcs:|Y
01|224270|1|6|10+ pcs:|Y
01|224270|2|1|**Quoted at NET price**|Y
01|224270|2|2|QTY BREAK NET PRICING|Y
01|224270|2|3|1-4 pcs:|Y
01|224270|2|4|5-9 pcs:|Y
01|224270|2|5|10+ pcs:|Y
01|224276|5|1|Additional IMTS promo discount has been added to|Y
01|224276|5|2|standard 25% discount|Y
01|224282|1|1|HSK100A-HC6-85|Y
01|224282|1|2|Net Price for MMC|Y
01|224282|2|1|HSK100A-HC8-85|Y
01|224282|2|2|Net price for MMC|Y
01|224282|3|1|HSK100-HC10-90|Y
01|224282|3|2|Net Price for MMC|Y
01|224282|4|1|HSK100-HC12-95|Y
01|224282|4|2|Net price for MMC|Y
01|224283|1|1|P/N: NCAT40-SF16-65|Y
01|224283|1|2|Dual Contact CAT40 taper 16mm shrink fit holder with|Y
01|224283|1|3|65mm gauge length.  No coolant ports|Y
01|224285|2|1|C8 Shell Mill Holder coolant thru with IDChip Hole|Y
01|224285|2|2|GL 11.81 >> 6.890|Y
01|224288|2|1|Please note additional 20% applied per overstock promo.|Y
01|224288|2|2|These items cannot be cancelled or returned upon|Y
01|224288|2|3|receipt of PO/order.|Y
01|224292|1|1|Special pricing|Y
01|224292|2|1|Free Check Up with the purchase of 2-Sets 5AX-130AA21|Y
01|224292|3|1|Free 2-back up motors with the purchase of 2-sets|Y
01|224292|3|2|5AX-130AA21|Y
01|224292|4|1|A tariff surcharge may be added to this quotation in|Y
01|224292|4|2|the event of a sustained tariff increase on the|Y
01|224292|4|3|importation of this product.  Any surcharge will be|Y
01|224292|4|4|disclosed prior to acceptance of an order.|Y
01|224293|1|1|Please note: This tool is non standard stock. Once a|Y
01|224293|1|2|purchase order is placed it cannot be cancelled or|Y
01|224293|1|3|returned.|Y
01|224297|1|1|Service call for Hathor Six  s/n:5905|Y
01|224297|1|2|This is a time based estimate.|Y
01|224297|1|3|Any parts that would be required would be additional.|Y
01|224300|1|1|This is a net charge for Lyndex Nikken to install an|Y
01|224300|1|2|existing CNC180FA-M table on a Campro or DMC VMC.|Y
01|224300|1|3|Customer is responsible for any options needed on VMC|Y
01|224300|1|4|to enable rotary integration.  Lyndex will supply axis|Y
01|224300|1|5|card if needed and other installation components.|Y
01|224302|46|1|Line 42 takes one (1) S3/4-16x11/16.  Lines 43-45 take|Y
01|224302|46|2|two (2) each.|Y
01|224311|1|1|1st Batch/991046 PTSol/Balon Corp. 10/1:DWG APRVED|Y
01|224311|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|224311|3|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|224311|4|1|1st Batch *Item @ Purchasing Room|Y
01|224311|5|1|1st Batch/993771|Y
01|224311|6|1|1st Batch/993771|Y
01|224311|7|1|1st Batch/993771|Y
01|224311|8|1|1st Batch/993771|Y
01|224314|1|1|For CNC202MA SN:26540TC RGA#TAR-61385|Y
01|224314|1|2|Full rebuild of the table includes labor all basic|Y
01|224314|1|3|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|224314|2|1|A tariff surcharge of 8% will be added to every order|Y
01|224314|2|2|placed after September 1st 2025(until further notice).|Y
01|224314|2|3|This surcharge will be acknowledged upon acceptance|Y
01|224314|2|4|of every order.|Y
01|224315|1|1|SK25-14|Y
01|224315|1|2|SK25 series collet 14mm ID|Y
01|224321|1|1|Quoted at NET price.|Y
01|224327|1|1|This item is from used inventory. Pictures provided.|Y
01|224327|1|2|S/N: 6713304|Y
01|224327|1|3|This item is purchased as is and has a 90 day guarantee|Y
01|224327|1|4|applied.  Non cancellable non returnable.|Y
01|224328|2|1|EXTERAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|224328|2|2|CUT TO LENGTH FOR OKUMA M460V VMC|Y
01|224330|2|1|Please note additional 10% applied per IMTS promotion.|Y
01|224340|2|1|Adapter plate for T-slotted face plate with rotary|Y
01|224340|2|2|union.|Y
01|224341|3|1|Installation includes: Drive unit short bar fiber|Y
01|224341|3|2|optic cable cummunications cable bulkhead cables|Y
01|224341|3|3|external cables parameter changes service time and|Y
01|224341|3|4|and travel.|Y
01|224342|24|1|Non-cancellable/Non-retunnable|Y
01|224342|26|1|Non-cancellable/Non-returnable|Y
01|224342|27|1|Non-cancellable/Non-returnable|Y
01|224344|1|1|Currently 6 in stock balance would be 1~2 weeks ARO.|Y
01|224344|2|1|Please note additional 20% applied per Overstock|Y
01|224344|2|2|Promotion.  Once a purchase order has been received|Y
01|224344|2|3|this item cannot be cancelled or returned.|Y
01|224348|3|1|Additioanl discount of 5% added to your standard|Y
01|224348|3|2|discount of 28% under the IMTS PROMO|Y
01|224351|5|1|A tariff surcharge may be added to this quotation in|Y
01|224351|5|2|the event of a sustained tariff increase on the|Y
01|224351|5|3|importation of this product.  Any surcharge will be|Y
01|224351|5|4|disclosed prior to acceptance of an order.|Y
01|224357|1|1|RGA#TAR-61370|Y
01|224357|1|2|CNCZ105LFA-M SN:2108|Y
01|224367|4|1|Additional 5% IMTS Promo discount applied to above|Y
01|224367|4|2|items only. Valid for drop-ship orders only until|Y
01|224367|4|3|11/30/24.|Y
01|224392|2|1|R/Table Inspection Service 1year pkg price.|Y
01|224392|2|2|3 L-N Service workers will attend.|Y
01|224392|3|1|R/Table Inspection Service 3years pkg price.|Y
01|224392|3|2|3 L-N Service workers will attend.|Y
01|224392|4|1|R/Table Inspection Service 5years pkg price.|Y
01|224392|4|2|3 L-N Service workers will attend.|Y
01|224392|7|1|R/Table Check up & Oil change service 1yrs PKG Price.|Y
01|224392|7|2|3 L-N Service workers will attend.|Y
01|224392|8|1|R/Table Check up & Oil change service 3yrs PKG Price.|Y
01|224392|8|2|3 L-N Service workers will attend.|Y
01|224392|9|1|R/Table Check up & Oil change service 5yrs PKG Price.|Y
01|224392|9|2|3 L-N Service workers will attend.|Y
01|224398|16|1|HSK100A taper w/ MI40 Quick Change 110mm tapered pin|Y
01|224398|16|2|design internal coolant|Y
01|224398|17|1|HSK100A taper w/ MI50 Quick Change 110mm tapered pin|Y
01|224398|17|2|design internal coolant|Y
01|224398|21|1|P/N: CAT40-MI40|Y
01|224398|21|2|CAT40 taper MI40 attachment|Y
01|224409|5|1|Additional 5% discount added to the 15% standard disct|Y
01|224416|1|1|Rotary table with Fanuc servo motor.|Y
01|224416|3|1|Machines must have enabled options to add additional|Y
01|224416|3|2|axis.  Will need to add two axis to each machine.|Y
01|224429|5|1|Please Note: IMTS promotion 5% extra added to the|Y
01|224429|5|2|discount on this quote. Promotion ends 11/29.|Y
01|224440|1|1|Toolholder will be balanced to 20000 RPM|Y
01|224441|1|1|**Quoted at NET Price**|Y
01|224441|1|2|BFH-1:1-Twin-A75 VDI50 MAZAK Nexus 350 MSY ER32|Y
01|224441|1|3|Tooling Interface: ER32 Collet System (3-20mmDIN 6499)|Y
01|224441|1|4|QTY Break NET Pricing:|Y
01|224441|1|5|1 pc: $10840.00|Y
01|224441|1|6|2+ pcs: $9713.00|Y
01|224441|1|7|DELIVERY: ~12 Wks after approval drawing is signed.|Y
01|224441|5|1|Final Part# TBD **Quoted at NET Price**|Y
01|224441|5|2|BFH-1:1-Twin-A75 VDI50 MAZAK Nexus 350 MSY MI50|Y
01|224441|5|3|Tooling Interface: MI50 QUICK CHANGE Wrench Included|Y
01|224441|5|4|QTY Break NET Pricing:|Y
01|224441|5|5|1 pc: $11390.00|Y
01|224441|5|6|2+ pcs: $10238.00|Y
01|224441|5|7|DELIVERY: ~14 Wks after approval drawing is signed.|Y
01|224442|1|1|5AX-130FA-M SN:1951|Y
01|224442|1|2|RGA#TAR-61386|Y
01|224442|2|1|Tilting Encoder Cover|Y
01|224448|38|1|10% ADDITIONAL DISCOUNT FROM IMTS PROMO|Y
01|224450|1|1|For CNCZ321MA SN:11151|Y
01|224450|1|2|Full rebuild of the table include labor all basic|Y
01|224450|1|3|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|224451|1|1|NCAT50-ZMAC25-135V|Y
01|224451|1|2|Net price for MMC|Y
01|224451|1|3|As special item can not be returned once invoiced|Y
01|224456|6|1|Additional 5% discount applied to both holders for|Y
01|224456|6|2|the 2024 IMTS Promotion for Advanced Tooling.|Y
01|224457|1|1|part# NC50RAM-ER11-208ST-110TP|Y
01|224457|1|2|Dual Contact CAT50 ER11 Slim Type Angle Head|Y
01|224457|1|3|No Coolant|Y
01|224457|1|4|1-2pc $12432.00ea/net|Y
01|224457|1|5|3-4pc $11320.00ea/net|Y
01|224457|1|6|5+pc  $9521.00ea/net|Y
01|224457|2|1|part# NC50RAM-ER25-180-110TP|Y
01|224457|2|2|Dual Contact CAT50 ER25 Standard Angle Head|Y
01|224457|2|3|ICE - can run internal/external or dry|Y
01|224457|2|4|1-2pc $9596.00ea/net|Y
01|224457|2|5|3-4pc $8484.00ea/net|Y
01|224457|2|6|5+pc  $7063.00ea/net|Y
01|224457|3|1|part# NC50RAM-ER25-180TS-110TP|Y
01|224457|3|2|Dual Contact CAT50 ER25 TwinSp Angle Head ExtC|Y
01|224457|3|3|1-2pc $10541.00ea/net|Y
01|224457|3|4|3-4pc $9429.00ea/net|Y
01|224457|3|5|5+pc  $7882.00ea/net|Y
01|224457|8|1|part# NC50RAM-ER25-185OT-110TP|Y
01|224457|8|2|Dual Contact CAT50 ER25 Offset Angle Head|Y
01|224457|8|3|ICE - can run internal/external or dry|Y
01|224457|8|4|1-2pc $11973.00ea/net|Y
01|224457|8|5|3-4pc $10860.00ea/net|Y
01|224457|8|6|5+pc  $9123.00ea/net|Y
01|224457|9|1|part# NC50RAM-ER25-215ST-110TP|Y
01|224457|9|2|Dual Contact CAT50 ER25 Slim Type Angle Head ExtC|Y
01|224457|9|3|1-2pc $13127.00ea/net|Y
01|224457|9|4|3-4pc $12015.00ea/net|Y
01|224457|9|5|5+pc  $10124.00ea/net|Y
01|224457|10|1|part# NC50RAM-ER32-180-110TP|Y
01|224457|10|2|Dual Contact CAT50 ER32 Standard Angle Head|Y
01|224457|10|3|ICE - can run internal/external or dry|Y
01|224457|10|4|1-2pc $10655.00ea/net|Y
01|224457|10|5|3-4pc $9544.00ea/net|Y
01|224457|10|6|5+pc  $7981.00ea/net|Y
01|224457|14|1|part# NC50RAM-ER32-180TS-110TP|Y
01|224457|14|2|Dual Contact CAT50 ER32 TwinSp AH ExtC|Y
01|224457|14|3|1-2pc $11000.00ea/net|Y
01|224457|14|4|3-4pc $9888.00ea/net|Y
01|224457|14|5|5+pc  $8280.00ea/net|Y
01|224457|15|1|part# NC50RAM-ER32-200OT-110TP|Y
01|224457|15|2|Dual Contact CAT50 ER32 Offset Angle Head|Y
01|224457|15|3|ICE - can run internal/external or dry|Y
01|224457|15|4|1-2pc $12780.00ea/net|Y
01|224457|15|5|3-4pc $11668.00ea/net|Y
01|224457|15|6|5pc   $9822.00ea/net|Y
01|224457|16|1|part# NC50RAM-ER32-285ST-110TP|Y
01|224457|16|2|Dual Contact CAT50 ER32 Slim Type Angle Head ExtC|Y
01|224457|16|3|1-2pc $13239.00ea/net|Y
01|224457|16|4|3-4pc $12127.00ea/net|Y
01|224457|16|5|5+pc  $10220.00ea/net|Y
01|224457|21|1|part# NC50RAM-ER40-215-110TP|Y
01|224457|21|2|Dual Contact CAT50 ER40 Standard Angle Head|Y
01|224457|21|3|ICE - can run internal/external or dry|Y
01|224457|21|4|1-2pc $11854.00ea/net|Y
01|224457|21|5|3-4pc $10742.00ea/net|Y
01|224457|21|6|5+pc  $9020.00ea/net|Y
01|224457|22|1|part# NC50RAM-ER40-215TS-110TP|Y
01|224457|22|2|Dual Contact CAT50 ER40 TwinSp Angle Head ExtC|Y
01|224457|22|3|1-2pc $12779.00ea/net|Y
01|224457|22|4|3-4pc $11667.00ea/net|Y
01|224457|22|5|5+pc  $9822.00ea/net|Y
01|224457|23|1|part# NC50RAM-ER40-260OT-110TP|Y
01|224457|23|2|Dual Contact CAT50 ER40 Offset Angle Head|Y
01|224457|23|3|ICE - can run internal/external or dry|Y
01|224457|23|4|1-2pc $13239.00ea/net|Y
01|224457|23|5|3-4pc $12127.00ea/net|Y
01|224457|23|6|5+pc  $10220.00ea/net|Y
01|224457|27|1|part# NC50RAM-MI40-180-110TP|Y
01|224457|27|2|Dual Contact CAT50 MI40 QC Angle Head|Y
01|224457|27|3|ICE - can run internal/external or dry|Y
01|224457|27|4|1-2pc $10631.00ea/net|Y
01|224457|27|5|3-4pc $9520.00ea/net|Y
01|224457|27|6|5+pc  $7961.00ea/net|Y
01|224457|28|1|part# NC50RAM-MI40-180TS-110TP|Y
01|224457|28|2|Dual Contact CAT50 MI40 QC TwinSp ExtC|Y
01|224457|28|3|1-2pc $11000.00ea/net|Y
01|224457|28|4|3-4pc $9888.00ea/net|Y
01|224457|28|5|5+pc  $8280.00ea/net|Y
01|224457|29|1|part# NC50RAM-MI40-215TS-110TP|Y
01|224457|29|2|Dual Contact CAT50 MI40 QC TwinSp ExtC|Y
01|224457|29|3|1-2pc $13609.00ea/net|Y
01|224457|29|4|3-4pc $12497.00ea/net|Y
01|224457|29|5|5+pc  $10541.00ea/net|Y
01|224457|35|1|part# NC50RAM-MI50-180-110TP|Y
01|224457|35|2|Dual Contact CAT50 MI50 Standard Angle Head|Y
01|224457|35|3|ICE - can run internal/external or dry|Y
01|224457|35|4|1-2pc $11070.00ea/net|Y
01|224457|35|5|3-4pc $9958.00ea/net|Y
01|224457|35|6|5+pc  $8340.00ea/net|Y
01|224457|36|1|part# NC50RAM-MI50-215TS-110TP|Y
01|224457|36|2|Dual Contact CAT50 MI50 QC TwinSp ExtC|Y
01|224457|36|3|1-2pc $13609.00ea/net|Y
01|224457|36|4|3-4pc $12497.00ea/net|Y
01|224457|36|5|5+pc  $10541.00ea/net|Y
01|224457|37|1|part# NC50RAM-MI63-215-110TP|Y
01|224457|37|2|Dual Contact CAT50 MI63 QC Standard Angle Head|Y
01|224457|37|3|ICE - can run internal/external or dry|Y
01|224457|37|4|1-2pc $13169.00ea/net|Y
01|224457|37|5|3-4pc $12058.00ea/net|Y
01|224457|37|6|5+pc  $10160.00ea/net|Y
01|224457|42|1|part# NC50FHM-ER25-195ICE-110TP|Y
01|224457|42|2|Dual Contact CAT50 ER25 FLEX Angle Head|Y
01|224457|42|3|ICE - can run internal/external or dry|Y
01|224457|42|4|1-2pc $16931.00ea/net|Y
01|224457|42|5|3-4pc $15819.00ea/net|Y
01|224457|42|6|5+pc  $13420.00ea/net|Y
01|224457|43|1|part# NC50FHM-ER32-215ICE-110TP|Y
01|224457|43|2|Dual Contact CAT50 ER32 FLEX Angle Head|Y
01|224457|43|3|ICE - can run internal/external or dry|Y
01|224457|43|4|1-2pc $17160.00ea/net|Y
01|224457|43|5|3-4pc $16048.00ea/net|Y
01|224457|43|6|5+pc  $13619.00ea/net|Y
01|224457|44|1|part# NC50FHM-MI50-215-110TP|Y
01|224457|44|2|Dual Contact CAT50 MI50 QC FLEX Angle Head|Y
01|224457|44|3|ICE - can run internal/external or dry|Y
01|224457|44|4|1-2pc $16885.00ea/net|Y
01|224457|44|5|3-4pc $15773.00ea/net|Y
01|224457|44|6|5+pc  $13381.00ea/net|Y
01|224457|54|1|Angle heads will require a positioning block.|Y
01|224457|54|2|Lyndex-Nikken can make the block after confirmation|Y
01|224457|54|3|of spindle drawing specs.|Y
01|224457|54|4|NET price|Y
01|224460|1|1|Service call for 2 x Hathor Six s/n: 5326 & 6052|Y
01|224460|1|2|This is a time based estimate.|Y
01|224460|1|3|Any parts that would be required would be additional.|Y
01|224461|1|1|RGA#LVR-61243/|Y
01|224461|1|2|Repair of OKV1-ER50Z s/n:AL0007 (Alps#OHA00-10000)|Y
01|224461|2|1|Bearings o-rings collet nut drive shaft and spindle|Y
01|224461|2|2|to be replaced.|Y
01|224463|4|1|Additional 5% discount applied for the 2024 IMTS|Y
01|224463|4|2|Promotion for Live & Static Tooling.|Y
01|224464|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|224464|2|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|224464|3|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|224464|4|1|Req.INS/Install E32-NUT|Y
01|224480|5|1|Live Tool IMTS24 promo extra 5% added to the discount|Y
01|224480|5|2|on this quote.|Y
01|224483|1|1|MU55-C4Z-125-ICE|Y
01|224483|1|2|Ref# 204824|Y
01|224483|1|3|Murata BMT55 Live PSC4 90D<Axial>IntExtCool 100bar 6.5K|Y
01|224483|1|4|CH 125|Y
01|224485|1|1|MU55-C4Z-125-ICE|Y
01|224485|1|2|Ref# 204824  WITH ELTIMON|Y
01|224485|1|3|Murata BMT55 Live PSC4 90D<Axial>IntExtCool 100bar 6.5K|Y
01|224485|1|4|CH 125|Y
01|224491|3|1|Additional 20% Overstock promo discount applied. This|Y
01|224491|3|2|item cannot be cancelled or returned upon receipt of PO|Y
01|224491|4|1|Valid for C4005-1375-9.19 only|Y
01|224495|1|1|Oil Change Cost for 1-29 units|Y
01|224495|2|1|Oil Change cost for 30+ Units|Y
01|224495|3|1|Oil Change Cost for all units (63)|Y
01|224497|1|1|P/N: TBD ARO|Y
01|224497|1|2|FLANGE MOUNTED HSK100A CAPTO C4 OUTPUT SPECIAL RIGHT|Y
01|224497|1|3|ANGLE HEAD; APPROXIMATELY 400MM GAUGE LENGTH;|Y
01|224497|1|4|DESIGNED TO BE DRIVEN BY SIEMENS CERAMIC BEARINGS|Y
01|224497|1|5|DIRECT DRIVE SPINDLE; WILL HAVE A SIDE PORT FOR|Y
01|224497|1|6|COOLANT TO BE PIPED IN FOR COOLANT THRU THE CAPTO|Y
01|224497|1|7|C4 SPINDLE OUTPUT.|Y
01|224506|2|1|For Samsung M500V Oi-MF. 4th-5th prep confirmed|Y
01|224506|2|2|To replace existing Koma 4th axis.|Y
01|224506|3|1|Air Hydraulic Booster 2 circuits (24VDC)|Y
01|224506|3|2|Only required for 5AX-250FA-M|Y
01|224506|6|1|adapter plate|Y
01|224506|7|1|IMTS Promo|Y
01|224513|1|1|For 5AX-130ZA SN:1765 RGA#TAR-61352|Y
01|224513|1|2|Full rebuild of the table include evallaborall basic|Y
01|224513|1|3|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|224516|1|1|P/N: NCAT40-SF20-65|Y
01|224516|1|2|Dual Contact CAT40 taper 20mm Shrink Fit Holder with|Y
01|224516|1|3|65mm gauge length and no coolant port.|Y
01|224517|1|1|RGA#LVR-61273/|Y
01|224517|1|2|Repair of BMT55-SK20X-ICE s/n: 92011 06|Y
01|224517|1|3|(Mimatic#187162)|Y
01|224517|2|1|Bearings seals and o-rings to be replaced.|Y
01|224517|4|1|RGA#LVR-61273/|Y
01|224517|4|2|Repair of BMT55-SK20X-ICE s/n: 92011 07|Y
01|224517|4|3|(Mimatic#187162)|Y
01|224517|5|1|Bearings seals o-rings and spindle to be replaced.|Y
01|224517|7|1|RGA#LVR-61273/|Y
01|224517|7|2|Repair of BMT55-SK20Z-ICE s/n: 19904096 01|Y
01|224517|7|3|(Mimatic#192909)|Y
01|224517|8|1|Bearings seals and o-rings to be replaced|Y
01|224517|10|1|RGA#LVR-61273/|Y
01|224517|10|2|Repair of BMT55-SK20Z-85-ICE s/n: 21902009 03|Y
01|224517|10|3|(Mimaitic#192910)|Y
01|224517|11|1|Bearings seals and o-rings to be replaced|Y
01|224523|1|1|Additional 10% IMTS Promo discount applied. Valid until|Y
01|224523|1|2|11/30/24 for drop-ship orders only.|Y
01|224523|2|1|Applied only to HSK63A-SK16C-120-IDU|Y
01|224525|1|1|C4-BBDH0187-060CP (for .1875 b-bar).|Y
01|224525|2|1|C4-BBDH0312-060CP (for .3125 b-bar).|Y
01|224525|3|1|C4-BBDH0500-075CP (for .500 b-bar).|Y
01|224525|4|1|C4-ASHR-24-104-16CP (C4-ASHR-23104-16)|Y
01|224529|1|1|RGA#LVR-61371/|Y
01|224529|1|2|Repair of MNL12-ER32X-ICE-10K s/n:21907701 05|Y
01|224529|1|3|(Mimatic#100876)|Y
01|224529|2|1|Bearings seals and o-rings to be replaced|Y
01|224533|1|1|RGA#TOR-61165/|Y
01|224533|1|2|Repair of CAT40U-UMT200|Y
01|224533|3|1|Calibration service included.|Y
01|224534|1|1|Please note: This is special non-standard stock.|Y
01|224534|1|2|It cannot be cancelled or returned once a PO is placed.|Y
01|224534|4|1|**Quoted at NET price**|Y
01|224534|4|2|This item is a custom special. Once a PO is placed it|Y
01|224534|4|3|cannot be cancelled or returned.|Y
01|224557|4|1|INCLUDES: AUTOMATIC DOOR SYSTEM FOR DOUBLE DOOR|Y
01|224557|4|2|MOUNTING KIT WITH CLEARANCE FOR HAAS CONTROL PENDANT|Y
01|224557|4|3|ARM HAAS DOOR OPENER INTERFACE|Y
01|224559|1|1|These are non-standard stock items and considered|Y
01|224559|1|2|specials. Once a PO has been issued these items cannot|Y
01|224559|1|3|be cancelled or returned. 2 months mtfg. upon signed|Y
01|224559|1|4|approval drawing plus 2 week delivery.|Y
01|224562|1|1|Overstock Discount for this item.|Y
01|224564|1|1|Please note: This is special non-standard stock.|Y
01|224564|1|2|It cannot be cancelled or returned once a PO is placed.|Y
01|224564|4|1|**Quoted at NET price**|Y
01|224564|4|2|This item is a custom special. Once a PO is placed it|Y
01|224564|4|3|cannot be cancelled or returned.|Y
01|224567|1|1|Please Note: This toolholder is non standard stock.|Y
01|224567|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|224567|1|3|or returned.|Y
01|224568|4|1|Additional 20% Overstock Promo discount applied. This|Y
01|224568|4|2|item cannot be cancelled or returned after receipt of|Y
01|224568|4|3|PO.|Y
01|224568|5|1|Applied only to NB3017-0025-4.00|Y
01|224575|1|1|Part Number: C5001-22-250|Y
01|224575|1|2|CAT50 Shell Mill Holder 22mm 250mm Gage Length|Y
01|224575|1|3|.|Y
01|224575|1|4|QTY Break NET Pricing:|Y
01|224575|1|5|1-2 pcs: $898.00|Y
01|224575|1|6|3+  pcs: $598.00|Y
01|224575|2|1|Part Number: C5001-22-300|Y
01|224575|2|2|CAT50 Shell Mill Holder 22mm 300mm Gage Length|Y
01|224575|2|3|.|Y
01|224575|2|4|QTY Break NET Pricing:|Y
01|224575|2|5|1-2 pcs: $938.00|Y
01|224575|2|6|3+  pcs: $638.00|Y
01|224575|3|1|Part Number: CAT50-C42-250-IDU|Y
01|224575|3|2|CAT50 Milling Chuck 42mm 250mm Gage Length can be|Y
01|224575|3|3|sleeved down with any KM42 collet|Y
01|224575|3|4|.|Y
01|224575|3|5|QTY Break NET Pricing:|Y
01|224575|3|6|1 pc: $1662.00|Y
01|224575|3|7|2+pcs: $1362.00|Y
01|224576|2|1|ASME T&G Steel Softjaw Set of 3 pointed|Y
01|224576|2|2|Dillon Mfg DM20112P $63ea less 20% sold ea.|N
01|224576|2|3|3 pcs req. for set.|N
01|224576|2|4|For SK-12 Scroll Chuck mat=steel; pointed|Y
01|224578|7|1|IMTS24LIVE promotion 10% has been added to the discount|Y
01|224578|7|2|on this quote.|Y
01|224582|1|1|IMTS Promo 5% extra added to the discount.|Y
01|224586|5|1|Trunnion table made from a weldment. Working surface to|Y
01|224586|5|2|be 44 X 88 held flat to within +/-.002 over working|Y
01|224586|5|3|surface.Stress relieved and finish ground.|Y
01|224586|5|4|Designed to mount to Nikken CNC803FA-M|Y
01|224592|1|1|Lyndex-Nikken Part Number TBD: Mimatic #191826|Y
01|224592|1|2|Quoted at NET price.|Y
01|224592|27|1|Quoted at Net price. Please note we ship the angle head|Y
01|224592|27|2|to customer first so they can take measurments for us|Y
01|224592|27|3|to make the positioning block.|Y
01|224595|1|1|Please note this is special non-standard stock. It|Y
01|224595|1|2|cannot be cancelled or returned after receipt of PO.|Y
01|224604|2|1|Please note IMTS24 promo 5% extra added to the discount|Y
01|224625|1|1|Quoted at NET price  please note this tooling is|Y
01|224625|1|2|non-standard stock. Once a purchase order is placed|Y
01|224625|1|3|it cannot be cancelled or returned.|Y
01|224627|1|1|Ramstar Part #SF5.9-C16-121|Y
01|224627|1|2|Quoted at NET price.|Y
01|224627|2|1|Ramstar Part #SF5.9-C16-121|Y
01|224627|2|2|Quoted at NET price.|Y
01|224627|3|1|Ramstar Part #SF5.9-C16-121|Y
01|224627|3|2|Quoted at NET price.|Y
01|224645|2|1|Please Note:IMTS24 promotion 5% extra added to the|Y
01|224645|2|2|discount on the toolholders.|Y
01|224649|2|1|Please Note: IMTS24 promo 5% extra added to the|Y
01|224649|2|2|discount on the holder.|Y
01|224660|1|1|TAR-61376|Y
01|224660|1|2|5AX-130SA-BR2 SN: 7159|Y
01|224660|30|1|Labor for Service Call on 11/13/2024|Y
01|224660|31|1|Expenses for service call: Gas/Food/Etc.|Y
01|224664|3|1|IMTS24 promo 5% extra has been added to the discount|Y
01|224664|3|2|for the CAT50-C1-135U-IDU|Y
01|224670|1|1|RGA#CUR-61358/|Y
01|224670|1|2|Repair of CAT50U-AHC1.1/4-210-90|Y
01|224670|15|1|RGA#CUR-61358/|Y
01|224670|15|2|Repair of CAT50U-AHC1.1/4-210-90|Y
01|224670|28|1|RGA#CUR-61358/|Y
01|224670|28|2|Repair of CAT50U-AFC1.1/4-230-90|Y
01|224686|1|1|CAT40-SK10-60U-J-IDU|Y
01|224686|1|2|CAT40 Slim Chuck SK10 JetSlotNut ChipHole 20K|Y
01|224690|3|1|M75X2.0 THREAD|N
01|224690|3|2|DT EXT L=49MM; DT RET L=33MM STROKE = 16MM W/ BR8|N
01|224690|3|3|17MM RECESS FROM SHEETMETAL TO SPINDLE NOSE BOLT CIR.|N
01|224690|3|4|SHEETMETAL DIA. CLEARANCE 210mm MAX|N
01|224690|3|5|FIELD VERIFY|N
01|224690|6|1|M60X2.0MM THREAD|N
01|224690|6|2|DT EXT L=28mm; DT RET L=16mm; STROKE= 12mm W/ BR6|N
01|224690|6|3|SPINDLE FACE PROJECTION 2mm FROM SHEETMETAL|N
01|224690|19|1|BACKSTOP DL65 SERIES QCC|Y
01|224690|19|2|SZM service part|N
01|224690|20|1|END STOP BLANK L=52mm; D=52mm|Y
01|224695|7|1|12K SPINDLE 10 CAP SCREW POSITIONING BLOCK|Y
01|224699|1|1|Final Part# TBD **Quoted at NET Price**|Y
01|224699|1|2|Description: Mimatic Driven Toolholdr for Mazak HQR 200|Y
01|224699|1|3|Slim Line Version Industry 4.0 - ELTIMON Included|Y
01|224699|1|4|Shaft: VDI40; collet holder: ER8; coolant/air supply:|Y
01|224699|1|5|external via pipe: Rotation: output is reversal to|Y
01|224699|1|6|input. Length: L=115.5mm/L1=63.6mm; Gear ratio: 1:2|Y
01|224699|1|7|Max torque: 3 Nm; Max spindle rev: n1(max)=4000rpm/n2|Y
01|224699|1|8|(max)=8000rpm; Weight: approx 9.5kg; Drawing# 00063813|Y
01|224699|18|1|Final Part# TBD  **Quoted at NET Price**|Y
01|224699|18|2|ELTIMON READER - ANDROID BASED|Y
01|224699|18|3|Reads Eltimon data and transfer to Eltimon cloud|Y
01|224699|18|4|Software: Eltimon Customer App|Y
01|224699|18|5|To be connected with WiFi|Y
01|224699|19|1|Final Part# TBD **Quoted at NET price**|Y
01|224699|19|2|ELTIMON SMART GATEWAY|Y
01|224699|20|1|A tariff surcharge may be added to this quotation in|Y
01|224699|20|2|the event of a sustained tariff increase on the|Y
01|224699|20|3|importation of this product.  Any surcharge will be|Y
01|224699|20|4|disclosed prior to acceptance of an order.|Y
01|224731|2|1|Please note additional 20% applied per overstock promo.|Y
01|224731|2|2|This item cannot be cancelled or returned upon receipt|Y
01|224731|2|3|of PO/order.|Y
01|224733|1|1|Lyndex-Nikken to modifiy holder to high speed and add|Y
01|224733|1|2|chip hole if needed.|Y
01|224745|6|1|CUSTOM POSITIONING BLOCK FOR FADAL VMC|Y
01|224749|2|1|Please Note: The IMTS24 promotion 5% extra added to|Y
01|224749|2|2|the CAT40-SK16-90U-IDU.Promotion expires 11/30/24.|Y
01|224750|5|1|A tariff surcharge may be added to this quotation in|Y
01|224750|5|2|the event of a sustained tariff increase on the|Y
01|224750|5|3|importation of this product.  Any surcharge will be|Y
01|224750|5|4|disclosed prior to acceptance of an order.|Y
01|224755|1|1|P/N: TBD ARO|Y
01|224755|1|2|FLANGE MOUNTED HSK100A CAPTO C4 OUTPUT SPECIAL RIGHT|Y
01|224755|1|3|ANGLE HEAD; APPROIMATELY 400MM GAUGE LENGTH;|Y
01|224755|1|4|DESIGNED TO DRIVEN BY SIEMENS CERAMIC BEARINGS|Y
01|224755|1|5|DIRECT DRIVE SPINDLE; WILL HAVE SIDE PORT FOR|Y
01|224755|1|6|COOLANT TO BE PIPED IN FOR COOLANT THRU THE CAPTO|Y
01|224755|1|7|C4 SPINDLE OUTPUT.|Y
01|224756|1|1|P/N: TBD ARO|Y
01|224756|1|2|FLANGE MOUNTED HSK100A CAPTO C4 OUTPUT SPECIAL RIGHT|Y
01|224756|1|3|ANGLE HEAD; APPROIMATELY 400MM GAUGE LENGTH;|Y
01|224756|1|4|DESIGNED TO DRIVEN BY SIEMENS CERAMIC BEARINGS|Y
01|224756|1|5|DIRECT DRIVE SPINDLE; WILL HAVE SIDE PORT FOR|Y
01|224756|1|6|COOLANT TO BE PIPED IN FOR COOLANT THRU THE CAPTO|Y
01|224756|1|7|C4 SPINDLE OUTPUT.|Y
01|224758|1|1|Please Note: Repair of customers cable. Quoted at NET|Y
01|224758|1|2|price.|Y
01|224758|1|3|Replacement Motor Cable to Amphenol connector Cable|Y
01|224758|1|4|For 5AX-230OSP SN 5006|Y
01|224758|1|5|L/N Repaired and replaced Amphenol connector side with|Y
01|224758|1|6|new wiring original motor mount plate was used|Y
01|224764|1|1|Currently one (1) in stock in Illinois.|Y
01|224764|1|2|If more are needed lead time is 20~22 Weeks.|Y
01|224771|1|1|Final Part# TBD **Quoted at NET Price**|Y
01|224771|1|2|Custom tool for Okuma Multus|Y
01|224771|1|3|DELIVERY: Please allow 2 weeks design time. Delivery|Y
01|224771|1|4|is ~10-12 weeks after approval drawing is signed by|Y
01|224771|1|5|the customer|Y
01|224771|2|1|Final Part# TBD **Quoted at NET Price**|Y
01|224771|2|2|Cross for C6-R-C5-R-55040|Y
01|224771|2|3|QTY Break NET Pricing:|Y
01|224771|2|4|1-2 pcs: $2514 ea|Y
01|224771|2|5|3+  pcs: $2183 ea|Y
01|224771|2|6|.|Y
01|224771|2|7|DELIVERY: 12-13 weeks after approval drawing is signed|Y
01|224771|2|8|by the customer|Y
01|224771|9|1|A tariff surcharge may be added to this quotation in|Y
01|224771|9|2|the event of a sustained tariff increase on the|Y
01|224771|9|3|importation of this product.  Any surcharge will be|Y
01|224771|9|4|disclosed prior to acceptance of an order.|Y
01|224774|6|1|Additioanl 10% has been added to the standard 18%|Y
01|224774|6|2|discount as part of the IMTS promotion. Promo end 11/30|Y
01|224786|2|1|Additional 5% discount applied for 2024 IMTS Promotion|Y
01|224786|2|2|for Toolholders.|Y
01|224795|1|1|CNC400HFA-6 SN:6075|Y
01|224795|1|2|RGA#TAR-61384|Y
01|224798|1|1|Replacment p/n C50S5-0875-3.90|Y
01|224800|3|1|(1) ADAPTER PLATE FOR MOUNTING SCHUNK KRP3 160|Y
01|224800|3|2|PNEUMATIC 3-JAW CLAMPING FORCE BLOCK|Y
01|224803|2|1|CUSTOM POSITIONING BLOCK FOR CAT40 FADAL VMC|Y
01|224803|2|2|***WILL NEED TO MEASURE SPINDLE FACE TO DETERMINE|Y
01|224803|2|3|WHERE POSITIONING BLOCK WILL NEED TO MOUNT***|Y
01|224807|1|1|Ref# 193289 Nakamura ER32 Live Tool|Y
01|224811|39|1|Additional 10% IMTS Promo Discount applied to all MMC|Y
01|224811|39|2|and VC holder. For drop-ship orders only. Valid until|Y
01|224811|39|3|11/30/2024.|Y
01|224811|40|1|A tariff surcharge may be added to this quotation in|Y
01|224811|40|2|the event of a sustained tariff increase on the|Y
01|224811|40|3|importation of this product.  Any surcharge will be|Y
01|224811|40|4|disclosed prior to acceptance of an order.|Y
01|224812|2|1|Additional 5% discount applied for the 2024 IMTS|Y
01|224812|2|2|Promotion for Advanced Toolholders.  See attached|Y
01|224812|2|3|flyer to quote email.|Y
01|224819|6|1|TOOLING CERTIFICATE FOR $1000 WITH THE PURCHASE|Y
01|224819|6|2|OF THIS PRESETTER PRIOR TO 11/30/24. MUST BE|Y
01|224819|6|3|DROP SHIPPED TO END USER.|Y
01|224820|1|1|Part Number: C5001-22-250|Y
01|224820|1|2|CAT50 Shell Mill Holder 22mm 250mm Gage Length|Y
01|224820|1|3|Quantity Breaks:|Y
01|224820|1|4|1-2 Pcs: $998.00/EA|Y
01|224820|1|5|3+ Pcs: $698.00/EA|Y
01|224820|2|1|Part Number: C5001-22-300|Y
01|224820|2|2|CAT50 Shell Mill Holder 22mm 300mm Gage Length|Y
01|224820|2|3|Quantity Breaks:|Y
01|224820|2|4|1-2 Pcs: $1038.00/EA|Y
01|224820|2|5|3+ Pcs: $738.00/EA|Y
01|224820|3|1|Part Number: CAT50-C42-250-IDU|Y
01|224820|3|2|CAT50 Milling Chuck 42mm 250mm Gage Length can be|Y
01|224820|3|3|sleeved down with any KM42 collet|Y
01|224820|3|4|Quantity Breaks:|Y
01|224820|3|5|1 Pc: $1762.00/EA|Y
01|224820|3|6|2+ Pcs: $1362.00/EA|Y
01|224820|6|1|A tariff surcharge of 8% will be added to every order|Y
01|224820|6|2|placed after September 1st 2025(until further notice).|Y
01|224820|6|3|This surcharge will be acknowledged upon acceptance|Y
01|224820|6|4|of every order.|Y
01|224825|1|1|Waiting on SN|Y
01|224826|2|1|Additional 5% IMTS Promo discount applied to|Y
01|224826|2|2|HSK63A-SK10C-104-IDU. For drop-ship orders only valid|Y
01|224826|2|3|until 11/30/24.|Y
01|224847|1|1|A21-400W-R SN:F00920288200025|Y
01|224847|1|2|RGA#TAR-61413|Y
01|224848|10|1|Additional 5% discount applied to Lines 1 2 4 & 6 for|Y
01|224848|10|2|the 2024 IMTS Promotion for Advanced Toolholders.|Y
01|224861|1|1|RGA#CUR-61301/|Y
01|224861|1|2|Repair of CAT40U-NX5-153|Y
01|224861|10|1|Re-greasing and calibration service included|Y
01|224874|2|1|Additional 20% Overstock Promo discount applied. This|Y
01|224874|2|2|item cannot be cancelled or returned.|Y
01|224874|3|1|Applied only to OKL3-ER32Z-OFM|Y
01|224878|1|1|Quoted at NET price|Y
01|224878|2|1|CAT40-SF8-120CP / CAT40 Shrink Fit Holder 8mm|Y
01|224878|2|2|with Coolant Ports  25K|Y
01|224878|2|3|Quoted at NET price|Y
01|224878|3|1|CAT40-SF8-100CP / CAT40 Shrink Fit Holder 8mm|Y
01|224878|3|2|with Coolant Ports  25K|Y
01|224878|3|3|Quoted at NET price|Y
01|224878|4|1|Quoted at NET price.|Y
01|224883|1|1|Mimatic # 102844|Y
01|224883|1|2|Adjustable ER32 LT for Okuma|Y
01|224886|7|1|Din N/A|Y
01|224892|1|1|BT50-FMC22-250|Y
01|224892|2|1|BT50-FMP27-250|Y
01|224892|3|1|BT50-DJ8-109N-BD|Y
01|224892|7|1|BT50-RAC180-185|Y
01|224893|16|1|Quoted at NET pricing|Y
01|224899|1|1|CAT40-SK16-90U-IDU with SKN-16BJ installed on holders.|Y
01|224899|1|2|Please note once a purchase order is placed it cannot|Y
01|224899|1|3|cancelled or returned.|Y
01|224899|1|4|Quoted at NET price.|Y
01|224902|3|1|These are non-standard stock items and considered|Y
01|224902|3|2|specials. Once a PO has been issued these items cannot|Y
01|224902|3|3|be cancelled or returned. After approval drawing|Y
01|224902|3|4|there will be a 4 month mtfg. time and 2 weeks to ship.|Y
01|224905|1|1|FOR DNM750II FANUC Oi-MF+|Y
01|224905|1|2|HYDRAULIC BOOSTER REQUIRED FOR BRAKE INCL.|Y
01|224905|1|3|RIGHT HAND MOUNT MOTOR CLOSEST TO OPERATOR DOOR|Y
01|224921|1|1|Please Note: This chuck is DIN coolant thru the flange.|Y
01|224921|1|2|Make sure they are running this on  a Mori Seiki|Y
01|224921|1|3|machine that has flange coolant capability.|Y
01|224921|1|4|This tool is non-returnable.|Y
01|224923|1|1|Part Number TBD / C8 PSC Reduction Adaptor|Y
01|224923|1|2|GL 6.89 >> 11.811|Y
01|224923|2|1|C8 Shell Mill Holder coolant thru with IDChip Hole|Y
01|224923|2|2|GL 11.81 >> 6.890|Y
01|224928|2|1|Please Note: IMTS promotion 5% extra added to the|Y
01|224928|2|2|discount on this quote.|Y
01|224929|2|1|Please note additional 20% applied per overstock promo.|Y
01|224929|2|2|These items cannot be cancelled or returned upon|Y
01|224929|2|3|receipt of PO/order.|Y
01|224938|1|1|Mimatic # 102844|Y
01|224938|1|2|Adjustable ER32 LT for Okuma|Y
01|224939|1|1|These are non-standard stock items and considered|Y
01|224939|1|2|specials. Once a PO has been issued these items cannot|Y
01|224939|1|3|be cancelled or returned.|Y
01|224952|1|1|Special IMTS demo table pricing|Y
01|224954|9|1|DNMG 432 (FINISH OD AND FACE)|Y
01|224954|11|1|CNMG432 (ROUGHING OD AND FACE)|Y
01|224956|1|1|BMT65 LIVE ER20 TWIN OUTPUT CENTRAL OFFSET A =43mm;|Y
01|224956|1|2|INT/EXT COOLANT / ICE; REVERSAL ROTATION;|Y
01|224956|1|3|1:2 GEAR MAX 5Nm/SPINDLE;MAX IN 5K RPM MAX OUT 10K RPM;|Y
01|224956|1|4|REF DRWG # 00056508;|Y
01|224956|1|5|Quoted for 1 tool.|Y
01|224957|1|1|FOR DNM500-II; OI-MF+; RHT SIDE MOUNT|Y
01|224957|1|2|HIGHER BRAKE TORQUE POSSIBLE W/ HYDRAULIC BRAKE OPT.|Y
01|224957|1|3|CABLES DRIVES HARDWARE INCLUDED WITH INSTALLATION.|Y
01|224957|1|4|5AX-201 FEATURES BUILT IN ROTARY JOINT IN A-AXIS.|Y
01|224957|1|5|EASILY ADD EXTERNAL PLUMBING OR ROTARY JOINT TO C-AXIS|Y
01|224963|15|1|Additional 10% discount applied to live tools only.|Y
01|224963|15|2|Valid until 11/30/24 for drop-ship orders only.|Y
01|224963|15|3|Subject to change if quantities decrease.|Y
01|224975|4|1|Additional 10% discount applied to above items only.|Y
01|224975|4|2|Valid untill 11/30 for drop-ship orders only.|Y
01|224975|4|3|Should quantities decrease please resubmit for quote.|Y
01|224982|4|1|The gage length on the holder is 2.5 and is|Y
01|224982|4|2|pre-balanced and balanceable. Overstock promotion|Y
01|224982|4|3|20% extra added to the discount and this item is|Y
01|224982|4|4|non-returnable.|Y
01|224989|5|1|Additional 5% discount applied for 2024 IMTS Promotion|Y
01|224989|5|2|for Live & Static Tooling (expires 11/30/2024).|Y
01|225011|3|1|External cables Set (Direct Mount)|Y
01|225013|3|1|This must be ordered with OR.VPA.DC/O-ring set|Y
01|225016|2|1|SINGLE PIECE POSITIONING BLOCK|Y
01|225016|3|1|2 PIECE POSITIONING BLOCK|Y
01|225025|3|1|60MM RISER FOR TAT-250 TO MATCH CENTER HEIGHT OF|Y
01|225025|3|2|CNC321 ROTARY TABLE|Y
01|225025|4|1|***SPECIAL*** 3000 PSI HIGH PRESSURE CAPABLE|Y
01|225025|4|2|6-PORT ROTARY JOINT|Y
01|225025|5|1|FANUC-IA-CB-CABLE-FBR-5|Y
01|225025|5|2|FANUC-IA-CB-CABLE-PWR-5|Y
01|225025|5|3|TCE-95951-2500R|Y
01|225025|5|4|TCE-95947-2500R|Y
01|225025|5|5|A06B-6290-H103|Y
01|225031|1|1|BMT75-STC8Z-IC  BMT75 Static PSC C8 Z<Axial>90D IntC|Y
01|225045|2|1|SINGLE PIECE POSITIONING BLOCK|Y
01|225045|3|1|2 PIECE POSITIONING BLOCK|Y
01|225055|1|1|NBT30-SKT20C-90P|Y
01|225055|1|2|Net price for AHNSA|Y
01|225058|1|1|5% IMTS Additional discount|Y
01|225061|2|1|This is the alternate item to the TQW-200.|Y
01|225061|2|2|We currently have plenty of stock on this item.|Y
01|225063|3|1|Please note additional 20% applied per overstock promo.|Y
01|225063|3|2|These items cannot be cancelled or returned upon|Y
01|225063|3|3|receipt of PO/order.|Y
01|225064|2|1|Please note additional 20% applied per overstock promo.|Y
01|225064|2|2|These items cannot be cancelled or returned upon|Y
01|225064|2|3|receipt of PO/order.|Y
01|225066|1|1|Please note pricing applies to minimum order quantity|Y
01|225066|1|2|of 12 pieces. Additional promotions or discounts do not|Y
01|225066|1|3|apply.|Y
01|225078|1|1|Service call for PRE-E460N-I50N s/n:6534|Y
01|225078|1|2|This is a time based estimate.|Y
01|225078|1|3|Any parts that would be required would be additional.|Y
01|225081|1|1|Quantity Breaks: (NET pricing)|Y
01|225081|1|2|1 pc: $351.00/EA|Y
01|225081|1|3|5+ pcs: $313.56/EA|Y
01|225081|1|4|10+ pcs: $280.80/EA|Y
01|225081|2|1|Quantity Breaks: (NET pricing)|Y
01|225081|2|2|1 pc: $352.50/EA|Y
01|225081|2|3|5+ pcs: $314.90/EA|Y
01|225081|2|4|10+ pcs: $282.00/EA|Y
01|225081|3|1|Quantity Breaks: (NET pricing)|Y
01|225081|3|2|1 pc: $366/EA|Y
01|225081|3|3|5+ pcs: $326.96/EA|Y
01|225081|3|4|10+ pcs: $292.80/EA|Y
01|225081|4|1|Quantity Breaks: (NET pricing)|Y
01|225081|4|2|1 pc: $324.00/EA|Y
01|225081|4|3|5+ pcs: $289.44/EA|Y
01|225081|4|4|10+ pcs: $259.20/EA|Y
01|225081|5|1|Quantity Breaks: (NET pricing)|Y
01|225081|5|2|1 pc: $309.00/EA|Y
01|225081|5|3|5+ pcs: $276.04/EA|Y
01|225081|5|4|10+ pcs: $247.20/EA|Y
01|225081|6|1|Quantity Breaks: (NET pricing)|Y
01|225081|6|2|1 pc: $309.00/EA|Y
01|225081|6|3|5+ pcs: $276.04/EA|Y
01|225081|6|4|10+ pcs: $247.20/EA|Y
01|225083|1|1|Please note this is special non-standard stock. Once|Y
01|225083|1|2|a PO is placed it cannot be cancelled or returned.|Y
01|225083|2|1|Please note this is special non-standard stock. Once|Y
01|225083|2|2|a PO is placed it cannot be cancelled or returned.|Y
01|225087|2|1|.216 - .236|Y
01|225087|3|1|.236 - . 255|Y
01|225087|4|1|.295 - .314|Y
01|225087|5|1|.314 - .334|Y
01|225092|2|1|6 Gage\|Y
01|225097|2|1|Please note additional 20% applied per overstock promo.|Y
01|225097|2|2|These items cannot be cancelled or returned upon|Y
01|225097|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|225097|2|4|need to be requoted.|Y
01|225098|23|1|Delivery: 42 pcs STOCK 20pcs ETA 1/15 Balance ~10 Wks|Y
01|225098|23|2|ARO [Note: No MFG from 1/25-2/2]|Y
01|225101|1|1|AC003007|Y
01|225101|2|1|AC003009|Y
01|225101|3|1|AC003011|Y
01|225101|4|1|AC003013|Y
01|225101|5|1|AC003018|Y
01|225101|6|1|AC003017|Y
01|225101|8|1|Charge to etch part numbers on tooling and re-label|Y
01|225101|8|2|boxes. Please note if tooling and packaging is etched|Y
01|225101|8|3|they are non-returnable.|Y
01|225107|1|1|Quoted at NET price.|Y
01|225116|2|1|NB3001-16-45|Y
01|225116|2|2|NBT30 DualContact Shell Mill Holder 16mm Pilot 45mm G/L|Y
01|225116|2|3|**No CoolantPorts|Y
01|225116|2|4|Lead time given as ADA - After Signed Drawing Approval|Y
01|225116|2|5|Please allow us 1-2 weeks to produce a approval drawing|Y
01|225139|1|1|BT50-C3/4-135G-IDI BT50 Milling Chuck 3/4 6K|Y
01|225139|1|2|Chip Hole and Chip installed per Pratt installation|Y
01|225139|1|3|drawing.|Y
01|225139|2|1|Net price reflects Chip hole and BIS M-122-02/A|Y
01|225139|2|2|installation.|Y
01|225156|1|1|RGA#CUR-61388/|Y
01|225156|1|2|Repair of H80FRAM-ER16-206ST s/n: 19901249 01|Y
01|225156|1|3|(Mimatic#167594)|Y
01|225156|2|1|Bearings seals o-rings and damaged gears to be|Y
01|225156|2|2|replaced.|Y
01|225160|6|1|HSK63F-SK25-120P|Y
01|225160|7|1|HSK63F-SK25-90P|Y
01|225162|3|1|A tariff surcharge of 8% will be added to every order|Y
01|225162|3|2|placed after September 1st 2025(until further notice).|Y
01|225162|3|3|This surcharge will be acknowledged upon acceptance|Y
01|225162|3|4|of every order.|Y
01|225179|7|1|Please note additional 20% applied per overstock promo.|Y
01|225179|7|2|These items cannot be cancelled or returned upon|Y
01|225179|7|3|receipt of PO/order. Once stock is depleted these will|Y
01|225179|7|4|need to be requoted.|Y
01|225181|1|1|1st Batch|Y
01|225181|2|1|1st Batch|Y
01|225181|3|1|Req.INS/Check Alignment|Y
01|225183|1|1|QTY BREAK NET PRICING|Y
01|225183|1|2|1pc:  $17738.00ea/net|Y
01|225183|1|3|2pc:  $12834.00ea/net|Y
01|225183|1|4|14-15 WEEKS MFG.+ DELIVERY|Y
01|225187|1|1|HSK63A 3/4Shell Mill holder 38.1mm- 2 Gage Length|Y
01|225188|8|1|MAZAK INTEGREX AUTODOOR|Y
01|225188|9|1|Installation includes: Smart Hub and Autodoor mounting|Y
01|225188|9|2|of hardware and integration for two machines.|Y
01|225188|9|3|Integration of LN1813 cobot into one machine.|Y
01|225188|9|4|This covers travel time and on-site labor.|Y
01|225225|2|1|EXTERNAL POWER/FEEDBACK CABLES|Y
01|225229|5|1|HSK63F-SK25-90P|Y
01|225229|6|1|HSK63F-SK25-120P|Y
01|225232|2|1|Additional 20% discount applied for our Overstock|Y
01|225232|2|2|Promotion.  Once a Purchase Order has been received|Y
01|225232|2|3|this item cannot be cancelled or returned.|Y
01|225233|4|1|This item is non-standard stock.  Once a purchase|Y
01|225233|4|2|order has been received it cannot be cancelled or|Y
01|225233|4|3|returned.|Y
01|225251|20|1|Please Note: This is special non-stanadard stock.|Y
01|225251|20|2|This item cannot be cancelled or returned.|Y
01|225251|21|1|Please Note: This is special non-standard stock.|Y
01|225251|21|2|This item cannot be cancelled or returned.|Y
01|225264|2|1|This is an optional service where Lyndex Nikken will|Y
01|225264|2|2|design and manufacture the positioning block needed to|Y
01|225264|2|3|use this angle head.  This option requires customer|Y
01|225264|2|4|supply a machine spindle drawing and possibly some|Y
01|225264|2|5|dimensions from the machine.  Delivery is based on when|Y
01|225264|2|6|all needed data is supplied.  Please call Chris Blaine|Y
01|225264|2|7|with any questions or concerns.|Y
01|225268|1|1|1st Batch|Y
01|225273|1|1|P/N: CHS-3.175|Y
01|225273|1|2|1/8 collet for P/N: RA-200 angle head|Y
01|225273|1|3|Non-Returnable Non-Cancellable|Y
01|225273|1|4|Quoted at NET pricing|Y
01|225277|1|1|Part of Bila Air#242570297: No INS Req'd.|Y
01|225284|2|1|NBT40-SK10C-150P-J|Y
01|225284|2|2|NBT40 DualContact Slim Chuck SK10 Coolant HiSpeed 30K|Y
01|225284|2|3|G2.5 with COOLANT NUT INSTALLED.|Y
01|225284|4|1|NBT40-SK16C-150P-J|Y
01|225284|4|2|NBT40 DualContact Slim Chuck SK16 Coolant HiSpeed 30K|Y
01|225284|4|3|G2.5 with COOLANT NUT INSTALLED.|Y
01|225286|1|1|P/N: TBD ARO|Y
01|225286|1|2|FLANGE MOUNTED HSK100A CAPTO C4 OUTPUT SPECIAL RIGHT|Y
01|225286|1|3|ANGLE HEAD; APPROIMATELY 400MM GAUGE LENGTH;|Y
01|225286|1|4|DESIGNED TO DRIVEN BY SIEMENS CERAMIC BEARINGS|Y
01|225286|1|5|DIRECT DRIVE SPINDLE; WILL HAVE SIDE PORT FOR|Y
01|225286|1|6|COOLANT TO BE PIPED IN FOR COOLANT THRU THE CAPTO|Y
01|225286|1|7|C4 SPINDLE OUTPUT.|Y
01|225303|6|1|Item is non-standard stock. Once a Purchase Order has|Y
01|225303|6|2|been received item cannot be cancelled or returned.|Y
01|225303|9|1|Item is non-standard stock.  Once a Purchase Order has|Y
01|225303|9|2|been received item cannot be cancelled or returned.|Y
01|225305|2|1|Additional 20% discount applied to this item for our|Y
01|225305|2|2|Overstock Promotion.  Once a Purchase Order is received|Y
01|225305|2|3|for this item it cannot be cancelled or returned.|Y
01|225309|1|1|Holder discounted at 50% (standard discount 35%)|Y
01|225309|1|2|Modification Coolant Ports $70|Y
01|225309|1|3|Net price $131 ea|Y
01|225310|2|1|Please Note: This tool is on our Overstock list and|Y
01|225310|2|2|an extra 20% has been added to the disocunt.|Y
01|225310|2|3|Once an order is placed it is non-returnable.|Y
01|225312|1|1|INS Req'd(REPEAT)995942 DXP/ASI/Treske|Y
01|225312|1|2|Shipped by BOAT in error?|N
01|225312|2|1|T/P Inspection Required|Y
01|225312|3|1|T/P Inspection Required|Y
01|225312|4|1|T/P Inspection Required|Y
01|225312|5|1|T/P Inspection Required|Y
01|225313|1|1|UNV_423|Y
01|225313|1|2|Delivery for balance is once approval drawing is signed|Y
01|225313|1|3|and returned.|Y
01|225318|3|1|Additional 20% OVERSTOCK discount added to std %35|Y
01|225318|3|2|Final sale|Y
01|225322|1|1|5AXZ-DD350F SN: 1009|Y
01|225322|1|2|OKK MACHINE VC-X350 SN: 266|Y
01|225322|1|3|CUSTOMER HAS OVERLOAD ALARM CANNOT ROTATE TILTING AXIS|Y
01|225322|2|1|LABOR FOR X2 TECHS TO REPAIR|Y
01|225322|3|1|EXPENSES FOR X2 TECHS|Y
01|225322|3|2|AIRFAIRE SHIPPING COSTS HOTEL GAS MEALS TRAVEL ETC|Y
01|225322|4|1|INCLUDES: BEARINGS/SEALS/O-RINGS/WORM WHEEL AND SCREW|Y
01|225333|1|1|Machine Tool must have the 4th and 5th axis interface|Y
01|225333|1|2|installed to the machine bulkhead.The Nikken table will|Y
01|225333|1|3|include cables from the rotary to the machine bulkhead|Y
01|225333|1|4|The machines will also need to have the 3rd party|Y
01|225333|1|5|software option|Y
01|225342|2|1|These are non-standard stock items and considered|Y
01|225342|2|2|specials. Once a PO has been issued these items cannot|Y
01|225342|2|3|be cancelled or returned. Please note 4 month lead time|Y
01|225342|2|4|between manufacturing and delivery.|Y
01|225351|1|1|This is special price for stock currently at LN|Y
01|225351|1|2|Once stock is depleted this item will need to be|Y
01|225351|1|3|requoted|Y
01|225357|1|1|Lyndex-Nikken Overstock discount applied to the|Y
01|225357|1|2|holders only (20%).These are non returnable.|Y
01|225363|3|1|**One time NET charge**|Y
01|225365|1|1|No Ins. Required.|Y
01|225365|2|1|No Ins. Required.|Y
01|225365|3|1|No Ins. Required.|Y
01|225365|4|1|No Ins. Required.|Y
01|225368|1|1|HSK63A 1 SF holder with 10 GL|Y
01|225368|2|1|HSK63A 1 SF holder with 12 GL|Y
01|225389|1|1|HOWA#TBD(H01MA12 O-****): Modified H01MA12|Y
01|225389|1|2|With seal to prevent coolant intrusion for vertical|Y
01|225389|1|3|lathe. With A11 adapter.|Y
01|225389|1|4|Modified to match with the customer's draw tube spec|Y
01|225389|1|5|(M27x3)|Y
01|225390|4|1|Please note additional 20% applied per overstock promo.|Y
01|225390|4|2|These items cannot be cancelled or returned upon|Y
01|225390|4|3|of PO/order. Once stock is depleted these will need to|Y
01|225390|4|4|be requoted.|Y
01|225390|8|1|Placeholder for H50E-SF0125-3.15.|Y
01|225390|8|2|These are non-standard stock items and considered|Y
01|225390|8|3|specials. Once a PO has been issued these items cannot|Y
01|225390|8|4|be cancelled or returned.|Y
01|225390|10|1|These are non-standard stock items and considered|Y
01|225390|10|2|specials. Once a PO has been issued these items cannot|Y
01|225390|10|3|be cancelled or returned.|Y
01|225390|12|1|Placeholder for H50E-SF0187-3.15.|Y
01|225390|12|2|These are non-standard stock items and considered|Y
01|225390|12|3|specials. Once a PO has been issued these items cannot|Y
01|225390|12|4|be cancelled or returned.|Y
01|225390|14|1|Placeholder for H50E-SF0187-6.30.|Y
01|225390|14|2|These are non-standard stock items and considered|Y
01|225390|14|3|specials. Once a PO has been issued these items cannot|Y
01|225390|14|4|be cancelled or returned.|Y
01|225390|18|1|Please note additional 20% applied per overstock promo.|Y
01|225390|18|2|These items cannot be cancelled or returned upon|Y
01|225390|18|3|of PO/order. Once stock is depleted these will need to|Y
01|225390|18|4|be requoted.|Y
01|225390|20|1|Placeholder for HSK50E-ER32-3.15.|Y
01|225390|20|2|These are non-standard stock items and considered|Y
01|225390|20|3|specials. Once a PO has been issued these items cannot|Y
01|225390|20|4|be cancelled or returned.|Y
01|225390|22|1|Placeholder for HSK50E-ER16-3.15.|Y
01|225390|22|2|These are non-standard stock items and considered|Y
01|225390|22|3|specials. Once a PO has been issued these items cannot|Y
01|225390|22|4|be cancelled or returned.|Y
01|225390|24|1|Placeholder for HSK50E-ER16-6.30.|Y
01|225390|24|2|These are non-standard stock items and considered|Y
01|225390|24|3|specials. Once a PO has been issued these items cannot|Y
01|225390|24|4|be cancelled or returned.|Y
01|225390|29|1|Please note additional 20% applied per overstock promo.|Y
01|225390|29|2|These items cannot be cancelled or returned upon|Y
01|225390|29|3|of PO/order. Once stock is depleted these will need to|Y
01|225390|29|4|be requoted.|Y
01|225400|1|1|Final Part# TBD **Quoted at NET Price** MOQ 5 PIECES|Y
01|225400|1|2|CAT40 End Mill Holder 40mm 25K|Y
01|225400|1|3|Please note: This is a custom special item. Once a PO|Y
01|225400|1|4|is placed it cannot be cancelled or returned.|Y
01|225400|1|5|.|Y
01|225400|1|6|QTY PRICE BREAK|Y
01|225400|1|7|5-9 pcs: $216.00|Y
01|225400|1|8|10+ pcs: $165.00|Y
01|225402|1|1|Includes: 400mm rotary table with 1100lbs weight|Y
01|225402|1|2|capacity. Nikken AR21 stand-alone control pendant with|Y
01|225402|1|3|15ft cable power cable for the unit and M-code cable.|Y
01|225402|1|4|Installation not included.|Y
01|225402|2|1|Note: The Air/hyd booster is not required if the table|Y
01|225402|2|2|brake system is not in use.|Y
01|225408|1|1|HSK50A-C16-90 HSK50A Milling Chuck 16mm|Y
01|225408|1|2|Please Note: This tooling is non standard stock.|Y
01|225408|1|3|Once a purchase order is placed it cannot be cancelled|Y
01|225408|1|4|or returned.|Y
01|225408|3|1|Once a purchase order is placed it cannot be cancelled|Y
01|225408|3|2|or returned.|Y
01|225408|4|1|Once a purchase order is placed it cannot be cancelled|Y
01|225408|4|2|or returned.|Y
01|225408|5|1|CCK16-1/2 Coolant Collet|Y
01|225408|5|2|Once a purchase order is placed it cannot be cancelled|Y
01|225408|5|3|or returned.|Y
01|225408|6|1|CKFN16-1/2C Coolant Nut|Y
01|225408|6|2|Once a purchase order is placed it cannot be cancelled|Y
01|225408|6|3|or returned.|Y
01|225408|7|1|CCK16-3/8 Coolant Collet|Y
01|225408|7|2|Once a purchase order is placed it cannot be cancelled|Y
01|225408|7|3|or returned.|Y
01|225408|8|1|CKFN16-3/8C  Coolant Nut|Y
01|225408|8|2|Once a purchase order is placed it cannot be cancelled|Y
01|225408|8|3|or returned.|Y
01|225408|9|1|HSK50A-ER32-70 Collet Chuck HiTorque Bearing Nut|Y
01|225408|9|2|Chiphole|Y
01|225408|9|3|Please Note: Delivery is based upon receipt of order|N
01|225408|9|4|after signed approval drawing is received.|N
01|225408|9|5|These holders are special once a purchase order is|N
01|225408|9|6|placed it cannot be cancelled or returned.|N
01|225408|11|1|HSK50A-ER16-70 Collet Chuck HiTorque Bearing Nut|Y
01|225408|11|2|Chip Hole|Y
01|225408|12|1|HSK50A-ER16-90 Collet Chuck HiTorque Bearing Nut 25K|Y
01|225408|12|2|Chiphole|Y
01|225408|14|1|HSK50A-0375-2.50 End Mill Holder 3/8|Y
01|225408|14|2|Minimum Order 5-pcs / 10-pc price $303.00 list less 40%|Y
01|225408|15|1|HSK50A-0500-2.50 End Mill Holder 1/2|Y
01|225408|15|2|Minimum Order 5-pcs / 10-pc price $303.00 list less 40%|Y
01|225408|16|1|HSK50A-SM0375-1.75CP Shell Mill Holder 3/8 CoolantPort|Y
01|225408|16|2|Minimum Order 5-pcs / 10-pc price $275.00 list less 40%|Y
01|225408|17|1|HSK50A-SM0500-1.75CP Shell Mill Holder 1/2 CoolantPort|Y
01|225408|17|2|Minimum Order 5-pcs / 10-pc price $275.00 list less 40%|Y
01|225419|1|1|CAT40 End Mill Holders with a 50mm ID 2 gauge length|Y
01|225419|2|1|CAT40 End Mill Holders with a 50mm ID 4 gauge length|Y
01|225419|3|1|CAT40 End Mill Holders with a 50mm ID 6 gauge length|Y
01|225441|2|1|**Quoted at NET Price**|Y
01|225441|2|2|LN to thread blank draw nut to match customer's machine|Y
01|225441|2|3|drawtube. Delivery is 3-5 days upon receipt of specs|Y
01|225441|2|4|from customer.|Y
01|225445|1|1|P/N: NBT40-SF20-65|Y
01|225445|1|2|BT40 Dual Contact 20mm Shrink Fit Holder w/ 65mm gauge|Y
01|225445|1|3|length.  Without Coolant Ports due to short g.l.|Y
01|225446|1|1|16C collet 1.358 smooth & serrated|Y
01|225451|1|1|RGA#TOR-61402/|Y
01|225451|1|2|Repair of BT30-MMC8C-105-AA|Y
01|225451|6|1|RGA#TOR-61402/|Y
01|225451|6|2|Repair of BT30-MMC8C-105-AA|Y
01|225451|12|1|RGA#TOR-61402/|Y
01|225451|12|2|Repair of BT30-MMC8C-105-AA|Y
01|225454|1|1|Quoted at NET pricing|Y
01|225454|2|1|CUSTOM POSITIONING BLOCK FOR HSK100A MAZAK MACHINE|Y
01|225454|4|1|CUSTOM POSITIONING BLOCK FOR CAT50 HAAS MACHINE|Y
01|225455|1|1|New 3 pin flange assembly for C50RAM-CT50-235IC-110TP3|Y
01|225455|1|2|but with H7 tolerance fixed cylindrical pin.|Y
01|225455|1|3|Rich Makuch from Mimatic to visit customer to install|Y
01|225455|1|4|new assmebly and positioning block.|Y
01|225455|1|5|Quoted at NET price.|Y
01|225455|2|1|Quoted at Net price.|Y
01|225457|1|1|MSC SKU: 97282123|Y
01|225457|2|1|*non-coolant|Y
01|225460|1|1|Overstock promo 20% has been added to the discount.|Y
01|225463|2|1|Additional 20% Overstock Promo discount applied. This|Y
01|225463|2|2|item cannot be cancelled or returned upon receipt of|Y
01|225463|2|3|PO|Y
01|225463|3|1|Applied only to C5037-0020-8.00|Y
01|225464|1|1|5AX-201FA-M SN:5701|Y
01|225464|1|2|RGA#TAR-61138|Y
01|225466|1|1|The pricing is special|Y
01|225472|1|1|Currently two (2) available in Illinois the balance|Y
01|225472|1|2|would be here in 1~2 weeks after receipt of an order.|Y
01|225472|1|3|Item is non-standard stock.  Once a purchase order has|Y
01|225472|1|4|been received item cannot be cancelled or returned.|Y
01|225472|2|1|ETA is 1~2 weeks after receipt of an order.  Item is|Y
01|225472|2|2|non-standard stock.  Once a purchase order has been|Y
01|225472|2|3|received this item cannot be cancelled or returned.|Y
01|225472|3|1|Currently two (2) in stock in Illinois.  Balance of|Y
01|225472|3|2|nine (9) would be 14~16 weeks after receipt of an|Y
01|225472|3|3|order.  Item is non-standard stock.  Once a purchase|Y
01|225472|3|4|order has been received item cannot be cancelled or|Y
01|225472|3|5|returned.|Y
01|225485|2|1|Please note: This is special non-standard stock. Once|Y
01|225485|2|2|a PO is placed this item cannot be cancelled or|Y
01|225485|2|3|returned.|Y
01|225486|1|1|Delivery: If we order by 12/19ETA Mid Feb.|Y
01|225486|1|2|Otherwise 12~13 Weeks.|Y
01|225486|2|1|Stock|Y
01|225496|8|1|CINCINNATI U5 CUSTOM POSITIONING BLOCK|Y
01|225513|4|1|These are custom application units. Application must be|Y
01|225513|4|2|approved. Once a PO has been issued these cannot be|Y
01|225513|4|3|cancelled or returned.|Y
01|225514|1|1|T/P Inspection Required|Y
01|225515|2|1|Includes travel and labor for installing table on Haas|Y
01|225515|2|2|VF3.  Machine must have the third party software option|Y
01|225515|2|3|prior to our install.|Y
01|225518|1|1|Service call for E460N s/n:6570|Y
01|225518|1|2|This is a time based estimate.|Y
01|225518|1|3|Any parts that would be required would be additional.|Y
01|225523|1|1|Service call for Hathor Six s/n:6827|Y
01|225523|1|2|This is a time based estimate.|Y
01|225523|1|3|Any parts that would be required would be additional.|Y
01|225534|2|1|R/Table Inspection Service 1year pkg price.|Y
01|225534|2|2|2 L-N Service workers will attend.|Y
01|225534|2|3|Hotel charges are not included.|Y
01|225534|3|1|R/Table Inspection Service 3years pkg price.|Y
01|225534|3|2|2 L-N Service workers will attend.|Y
01|225534|3|3|Hotel charges are not included.|Y
01|225534|4|1|R/Table Inspection Service 5years pkg price.|Y
01|225534|4|2|2 L-N Service workers will attend.|Y
01|225534|4|3|Hotel charges are not included.|Y
01|225534|7|1|R/Table Check up & Oil change service 1yrs PKG Price.|Y
01|225534|7|2|3 L-N Service workers will attend.|Y
01|225534|7|3|Hotel charges are not included.|Y
01|225534|8|1|R/Table Check up & Oil change service 3yrs PKG Price.|Y
01|225534|8|2|3 L-N Service workers will attend.|Y
01|225534|8|3|Hotel charges are not included.|Y
01|225534|9|1|R/Table Check up & Oil change service 5yrs PKG Price.|Y
01|225534|9|2|3 L-N Service workers will attend.|Y
01|225534|9|3|Hotel charges are not included.|Y
01|225543|1|1|Final Part# TBD **Quoted at NET Price** MOQ of 5 pcs|Y
01|225543|1|2|Special 5C collet 1.0035 round internal threads|Y
01|225543|1|3|Please note: This is a special custom item. Once a PO|Y
01|225543|1|4|is placed it cannot be cancelled or returned.|Y
01|225543|1|5|.|Y
01|225543|1|6|Delivery is ~7-8 weeks after approval drawing is signed|Y
01|225543|1|7|by the customer.|Y
01|225546|1|1|Final Part# TBD **Quoted at NET price**|Y
01|225546|1|2|QTY Break Pricing:|Y
01|225546|1|3|1 pcs: $8910.00|Y
01|225546|1|4|2 pcs: $7392.00|Y
01|225546|1|5|3+pcs: $6880.00|Y
01|225546|1|6|.|Y
01|225546|1|7|Delivery: 4 Wks design 12 wks manufacturing + shipping|Y
01|225546|1|8|after approval drawing has been signed by the customer|Y
01|225546|27|1|Final Part# TBD **Quoted at NET price**|Y
01|225546|27|2|Delivery: 4 Wks design 12 wks manufacturing + shipping|Y
01|225546|27|3|after approval drawing has been signed by the customer|Y
01|225546|27|4|.|Y
01|225546|27|5|Please note this is a special custom tool for|Y
01|225546|27|6|specific applications. It cannot be cancelled or|Y
01|225546|27|7|returned after receipt of PO.|Y
01|225547|1|1|Quantity Breaks as follows: (NET)|Y
01|225547|1|2|Qty 1-19: $1936.00/EA|Y
01|225547|1|3|Qty 20+: $1760.00/EA|Y
01|225554|11|1|E16-SET-13-MM|Y
01|225554|11|2|ER16 Metric Collet Set 13pc 4-10mm|Y
01|225554|11|3|ref BOM E16-SET-13(C)-MM|N
01|225554|28|1|*Non-standard stock and considered a special.|Y
01|225554|28|2|Cannot be cancelled or returned|Y
01|225563|1|1|Discount reflects purchase of 1~5 holders.|Y
01|225563|2|1|Discount reflects purchase of 6~10 holders.|Y
01|225563|3|1|Discount reflects purchase of 11~15 holders.|Y
01|225563|4|1|Discount reflects purchase of 16~20 holders.|Y
01|225563|5|1|Discount reflects purchase of 21+ holders.|Y
01|225573|38|1|10% ADDITIONAL DISCOUNT FROM IMTS PROMO|Y
01|225579|1|1|Inspection Not Required.|Y
01|225579|2|1|Inspection Not Required.|Y
01|225579|3|1|Inspection Not Required.|Y
01|225579|4|1|Inspection Not Required.|Y
01|225579|5|1|Inspection Not Required.|Y
01|225579|6|1|Inspection Not Required.|Y
01|225579|7|1|Inspection Not Required.|Y
01|225579|8|1|SP Repeat. Inspection Not Required.|Y
01|225585|1|1|For customers exisiting angle head|Y
01|225585|1|2|Item is Final Sale. Non-cancellable/non-returnable.|Y
01|225596|1|1|Replacement for 5AXZ-DD350F SN: 1009 FOR NEXTEER|Y
01|225596|1|2|PRICE INCLUDES TABLE + MOUNTING BASE FOR TRANSPORT|Y
01|225598|1|1|Service call for Sethy Six s/n:5690|Y
01|225598|1|2|This is a time based estimate.|Y
01|225598|1|3|Any parts that would be required would be additional.|Y
01|225605|2|1|EXTERNAL POWER/FEEDBACK CABLES|Y
01|225608|2|1|Additional 20% discount applied for our Overstock|Y
01|225608|2|2|Promotion.  Once a Purchase Order has been received|Y
01|225608|2|3|this item cannot be cancelled or returned.|Y
01|225608|3|1|This item is non-standard stock.  Once a Purchase|Y
01|225608|3|2|Order has been received this item cannot be cancelled|Y
01|225608|3|3|or returned.|Y
01|225609|2|1|HSK63A-SK6C-120-IDU-J|Y
01|225609|2|2|HSK63A Slim Chuck SK6 Coolant ChipHole JET SLOT nut|Y
01|225631|14|1|A tariff surcharge of 8% will be added to every order|Y
01|225631|14|2|placed after September 1st 2025(until further notice).|Y
01|225631|14|3|This surcharge will be acknowledged upon acceptance|Y
01|225631|14|4|of every order.|Y
01|225634|1|1|Mimatic #00062833 ER20|Y
01|225638|1|1|Final Part# SK13-3-RP **Quoted at NET Price**|Y
01|225638|2|1|Final Part# SK13-3.5-RP **Quoted at NET Price**|Y
01|225638|3|1|Final Part# SK13-4-RP **Quoted at NET Price**|Y
01|225638|4|1|Final Part# SK13-5-RP **Quoted at NET Price**|Y
01|225638|5|1|Final Part# SK13-6-RP **Quoted at NET Price**|Y
01|225638|6|1|Final Part# SK13-6.5-RP **Quoted at NET Price**|Y
01|225638|7|1|Final Part# SK13-7-RP **Quoted at NET Price**|Y
01|225638|8|1|Final Part# SK13-7.5-RP **Quoted at NET Price**|Y
01|225638|9|1|Final Part# SK13-8-RP **Quoted at NET Price**|Y
01|225638|10|1|Final Part# SK13-9-RP **Quoted at NET Price**|Y
01|225638|11|1|Final Part# SK13-10-RP **Quoted at NET Price**|Y
01|225638|12|1|Final Part# SK13-11-RP **Quoted at NET Price**|Y
01|225638|13|1|Final Part# SK13-11.5-RP **Quoted at NET Price**|Y
01|225638|14|1|Final Part# SK13-12-RP **Quoted at NET Price**|Y
01|225638|15|1|Final Part# SK13-13-RP **Quoted at NET Price**|Y
01|225638|28|1|Final Part# SKJ16-7.5 **Quoted at NET price**|Y
01|225638|28|2|SK13/SK16 Coolant Cap 7.5mm Jet Slots|Y
01|225638|28|3|**Special non-standard stock. Cannnot be cancelled or|Y
01|225638|28|4|returned.|Y
01|225645|23|1|Final Part# SKJ16-7.5 **Quoted at NET price**|Y
01|225645|23|2|SK13/SK16 Coolant Cap 7.5mm Jet Slots|Y
01|225645|23|3|**Special non-standard stock. Cannnot be cancelled or|Y
01|225645|23|4|returned.|Y
01|225645|28|1|Final Part# SKJ16-7.5 **Quoted at NET price**|Y
01|225645|28|2|SK13/SK16 Coolant Cap 7.5mm Jet Slots|Y
01|225645|28|3|**Special non-standard stock. Cannnot be cancelled or|Y
01|225645|28|4|returned.|Y
01|225646|1|1|2 A/H  >> $10540.00 NET each|Y
01|225646|1|2|3 A/H  >> $9219.00  NET each|Y
01|225646|1|3|5 A/H  >> $8235.00  NET each|Y
01|225647|1|1|Cannot be cancelled or returned.|Y
01|225648|11|1|A tariff surcharge may be added to this quotation in|Y
01|225648|11|2|the event of a sustained tariff increase on the|Y
01|225648|11|3|importation of this product.  Any surcharge will be|Y
01|225648|11|4|disclosed prior to acceptance of an order.|Y
01|225655|1|1|Final Part# TBD **quoted at NET price**|Y
01|225655|1|2|HSK100T 5/8 End Mill holder 6 GL|Y
01|225655|1|3|.|Y
01|225655|1|4|Qty Break NET Pricing:|Y
01|225655|1|5|1-2 pcs: $1894.00|Y
01|225655|1|6|3-4 pcs: $1100.00|Y
01|225655|1|7|5+  pcs: $748.00|Y
01|225655|1|8|**Delivery: Please allow 10-12 weeks for manufacturing|Y
01|225655|1|9|and delivery after approval drawing is signed by the|Y
01|225655|1|10|customer.|Y
01|225655|2|1|Final part# TBD **Quoted at NET price**|Y
01|225655|2|2|HSK100T 1 End Mill Holder 6 GL|Y
01|225655|2|3|.|Y
01|225655|2|4|Qty Break NET Pricing:|Y
01|225655|2|5|1-2 pcs: $1894.00|Y
01|225655|2|6|3-4 pcs: $1100.00|Y
01|225655|2|7|5+  pcs: $748.00|Y
01|225655|2|8|**Delivery: Please allow 10-12 weeks for manufacturing|Y
01|225655|2|9|and delivery after approval drawing is signed by the|Y
01|225655|2|10|customer.|Y
01|225661|1|1|Install customers motor and gear box on the new table|Y
01|225661|1|2|as well as motor cover.|Y
01|225667|1|1|RGA#TOR-61421/|Y
01|225667|1|2|Repair of C5005-1375-6.77|Y
01|225674|1|1|GL3.54=89.91mm|Y
01|225674|2|1|GL5.12=130.04mm|Y
01|225674|3|1|GL3.54=89.91mm|Y
01|225674|4|1|GL3.54=89.91mm|Y
01|225674|5|1|GL3.54=89.91mm|Y
01|225679|1|1|T01|Y
01|225679|2|1|T02|Y
01|225679|3|1|T03|Y
01|225679|4|1|T04|Y
01|225679|5|1|T05|Y
01|225679|6|1|T06|Y
01|225679|7|1|T07|Y
01|225679|8|1|T08|Y
01|225679|9|1|T09|Y
01|225679|10|1|T10|Y
01|225679|11|1|T11|Y
01|225679|12|1|T12|Y
01|225679|13|1|T13|Y
01|225679|14|1|T14|Y
01|225679|15|1|T15|Y
01|225679|16|1|T16|Y
01|225679|17|1|T17|Y
01|225679|18|1|T18|Y
01|225679|19|1|T19|Y
01|225679|20|1|T20|Y
01|225679|21|1|T21|Y
01|225679|22|1|*non-coolant|Y
01|225679|29|1|For your reference several sizes of SK25 and SK10|Y
01|225679|29|2|collets are listed below. Please let us know the size|Y
01|225679|29|3|you need.|Y
01|225680|7|1|**Considered a special and is non-cancellable and|Y
01|225680|7|2|non-returnable once a PO has been placed.|Y
01|225680|12|1|Part Number: NCAT50-SK20C-165U-IDU|Y
01|225680|12|2|NCAT50 DualContact Slim Chuck SK20 Coolant 15K|Y
01|225680|12|3|**Considered a special and is non-cancellable and|Y
01|225680|12|4|non-returnable once a PO has been placed.|Y
01|225680|25|1|**Considered a special and is non-cancellable and|Y
01|225680|25|2|non-returnable once a PO has been placed.|Y
01|225690|1|1|Placeholder for C4 Shrink Fit Holder 8mm - C4-SF8-75CP.|Y
01|225690|1|2|These are non-standard stock items and considered|Y
01|225690|1|3|specials. Once a PO has been issued these items cannot|Y
01|225690|1|4|be cancelled or returned.|Y
01|225691|6|1|Installation includes mounting the table and parameter|Y
01|225691|6|2|changes. NOTE: Next Gen controls require 3rd party|Y
01|225691|6|3|software option.|Y
01|225693|1|1|This table is set up for a Haas machine installation|Y
01|225693|1|2|not included.|Y
01|225702|2|1|includes cables from table to machine bulk head|Y
01|225713|2|1|21mm equivalent. (.8267) Nom = .8281|Y
01|225713|3|1|Nom. = .844|Y
01|225713|4|1|Nom. = .859|Y
01|225718|1|1|Part Number to be determined.|Y
01|225718|1|2|Quoted at NET price.|Y
01|225727|1|1|Non-Returnable|Y
01|225727|3|1|Non-Returnable|Y
01|225734|1|1|Service call for Sethy Six  s/n: 6007|Y
01|225734|1|2|Experiencing hard drive failure and mechanical problems|Y
01|225734|1|3|This is a time based estimate.|Y
01|225734|1|4|Any parts that would be required would be additional.|Y
01|225748|1|1|Delivery = 6-8 weeks after approval drawing is signed|Y
01|225748|2|1|Delivery = 6-8 weeks after approval drawing is signed|Y
01|225750|11|1|Placeholder for BT50-RAC180-185.|Y
01|225750|11|2|These are non-standard stock items and considered|Y
01|225750|11|3|specials. Once a PO has been issued these items cannot|Y
01|225750|11|4|be cancelled or returned.|Y
01|225775|1|1|Please Note: Net price includes price of|Y
01|225775|1|2|BIS-M-122-02/A.|Y
01|225775|2|1|Please Note: Net price includes the cost of chip|Y
01|225775|2|2|installation and etching of Pratt's # PT457340 REV-|Y
01|225775|2|3|on holder and packaging.|Y
01|225781|1|1|NIT40N-MDPE-M16-95|Y
01|225791|4|1|Custom base plate for Haas VF2 with threaded hole|Y
01|225791|4|2|pattern for easy adjustment.|Y
01|225794|1|1|5AX-201OSP3-M-AB SN: 5341|Y
01|225794|1|2|CUSTOMER STATE THAT HAD CRASH AND SHIFTED TABLE|Y
01|225794|1|3|WORM WHEEL/SCREW BOTH OK NEED ALIGNMENT ADJUSTMENT|Y
01|225794|1|4|AND SOME SEALS REPLACED|Y
01|225800|1|1|RGA#TOR-61431/|Y
01|225800|1|2|Repair of CAT50U-UMT200|Y
01|225829|1|1|RGA#LVR-61417/|Y
01|225829|1|2|Repair of MNL12-ER32X s/n:A8223 (Alps# T32206)|Y
01|225829|2|1|Bearings o-rings seals collet nut and spindle to be|Y
01|225829|2|2|replaced.|Y
01|225834|1|1|TCE-97330/1|Y
01|225838|3|1|FOR DN SOLUTIONS DNM5700 VMC Fanuc Oi-MF+|Y
01|225838|3|2|Right side mountAY-orientation|Y
01|225861|2|1|First time customer per Nick Mazis - free standard|Y
01|225861|2|2|collet for every holder purchased.  Additional collets|Y
01|225861|2|3|would need to be purchased.|Y
01|225874|1|1|TAR-61467|SN:25065T|Y
01|225901|1|1|1st Batch|Y
01|225901|2|1|1st Batch|Y
01|225901|3|1|1st Batch|Y
01|225901|4|1|1st Batch|Y
01|225901|5|1|Req.INS/Alingment Check|Y
01|225901|6|1|Req.INS/Alingment Check|Y
01|225901|7|1|1st Batch|Y
01|225901|8|1|1st Batch|Y
01|225905|28|1|K32-SK13-150|Y
01|225905|28|2|Nikken Straight Shank Slim Chuck SK13 Extension 150 GL|Y
01|225905|28|3|Item is non-standard stock. Once a Purchase Order has|Y
01|225905|28|4|been received this item cannot be cancelled or|Y
01|225905|28|5|returned.|Y
01|225905|29|1|K32-SK13-180|Y
01|225905|29|2|Nikken Straight Shank Slim Chuck SK13 Extension 180 GL|Y
01|225905|29|3|Item is non-standard stock.  Once a Purchase Order has|Y
01|225905|29|4|been received this item cannot be cancelled or|Y
01|225905|29|5|returned.|Y
01|225914|1|1|C/L H = 80mm|Y
01|225914|1|2|This quote is good for 4-6pcs|Y
01|225916|1|1|Because these tables require an older generation motor|Y
01|225916|1|2|we will need to order them in along with proper sized|Y
01|225916|1|3|motor covers.  Delivery is contingent upon motor and|Y
01|225916|1|4|motor cover availability.|Y
01|225922|2|1|Please note additional 20% applied per overstock promo.|Y
01|225922|2|2|These items cannot be cancelled or returned upon|Y
01|225922|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|225922|2|4|need to be requoted.|Y
01|225930|15|1|Please note additional 20% applied per overstock promo.|Y
01|225930|15|2|These items cannot be cancelled or returned upon|Y
01|225930|15|3|receipt of PO/order. Once stock is depleted these will|Y
01|225930|15|4|need to be requoted.|Y
01|225941|1|1|For Okuma Genos M560V standard -T-slot faceplate|Y
01|225941|1|2|Drive and cables included with installation|Y
01|225941|1|3|Please provide control specs at time of order|Y
01|225964|1|1|HSK-50 TEST BAR - TNKQ2412-0699 0001|Y
01|225964|2|1|TNKQ2412-0699 0002|Y
01|225964|3|1|NC-5 TEST BAR - TNKQ2412-0699 0003|Y
01|225973|1|1|Once invoiced this item cannot be cancelled or|Y
01|225973|1|2|returned.|Y
01|225974|1|1|Special one-time discount applied. Once|Y
01|225974|1|2|invoiced this item cannot be cancelled or returned.|Y
01|225975|1|1|QCFC80 Collet - Part Number TBD per Drawing|Y
01|225976|1|1|Minimum Order Quantity: 3 pcs|Y
01|225983|16|1|A tariff surcharge of 8% will be added to every order|Y
01|225983|16|2|placed after September 1st 2025(until further notice).|Y
01|225983|16|3|This surcharge will be acknowledged upon acceptance|Y
01|225983|16|4|of every order.|Y
01|225990|2|1|Matsuura SP Cable for feedback|Y
01|225991|1|1|Please note this is special non-standard stock. It|Y
01|225991|1|2|cannot be cancelled or returned upon receipt of PO.|Y
01|225992|1|1|Item is non-standard stock.  Once a purchase order|Y
01|225992|1|2|is received this item cannot be cancelled or returned.|Y
01|226002|1|1|Req.INS/For stock|Y
01|226002|2|1|Req.INS/Check Alignment|Y
01|226002|3|1|Req.INS/Check Alignment|Y
01|226002|4|1|Req.INS/Check Alignment|Y
01|226002|5|1|Req.INS/Alingment Check|Y
01|226002|6|1|Req.INS/Check Alignment|Y
01|226004|1|1|Because these tables require an older generation motor|Y
01|226004|1|2|we will need to order them in along with proper sized|Y
01|226004|1|3|motor covers.  Delivery is contingent upon motor and|Y
01|226004|1|4|motor cover availability.|Y
01|226008|6|1|Additional 20% overstock promo discount applied. This|Y
01|226008|6|2|item cannot be cancelled or returned upon receipt of|Y
01|226008|6|3|PO.|Y
01|226008|7|1|Applied to C40S6-0187-1.38 only|Y
01|226013|2|1|Special one-time discount for purchase of 26+ pieces|Y
01|226013|2|2|only.|Y
01|226020|19|1|Please note additional 20% applied per overstock promo.|Y
01|226020|19|2|These items cannot be cancelled or returned upon|Y
01|226020|19|3|receipt of PO/order. Once stock is depleted these will|Y
01|226020|19|4|need to be requoted.|Y
01|226020|22|1|Please note additional 20% applied per overstock promo.|Y
01|226020|22|2|These items cannot be cancelled or returned upon|Y
01|226020|22|3|receipt of PO/order. Once stock is depleted these will|Y
01|226020|22|4|need to be requoted.|Y
01|226032|2|1|Price to be confirmed when currnet machine details are|Y
01|226032|2|2|provided.|Y
01|226044|1|1|Additional 20% discount applied for our Overstock|Y
01|226044|1|2|Promotion.  Once a Purchase Order has been received|Y
01|226044|1|3|this item cannot be cancelled or returned.|Y
01|226045|2|1|Please Note: I have added an extra 20% to the discount|Y
01|226045|2|2|for our Overstock promotion. This item is|Y
01|226045|2|3|non-returnable.|Y
01|226068|2|1|Please note additional 20% applied per overstock promo.|Y
01|226068|2|2|These items cannot be cancelled or returned upon|Y
01|226068|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|226068|2|4|need to be requoted.|Y
01|226075|1|1|Discount reflects a minimum PO of 25 Extensions.|Y
01|226075|2|1|Discount reflects a minimum PO of 25+ Extensions.|Y
01|226077|1|1|Placeholder for CAT50-AF1-20-OH.|Y
01|226077|1|2|CAT50 Back Spot Facing Arbor (MAIN BODY).|Y
01|226077|2|1|Placeholder for BF120-16.79-38.1-10.92C.|Y
01|226077|2|2|Arbor for the above.|Y
01|226077|3|1|Placeholder for 9BF120-16.79-38.1-10.92C-W.|Y
01|226077|3|2|Byte for the above one-piece construction style.|Y
01|226077|3|3|No need to order an insert(s) separately.|Y
01|226077|3|4|Minimum order quantity of 5 pieces.|Y
01|226095|2|1|RGA#TOR-61458/|Y
01|226095|2|2|Testing on a new presetter|Y
01|226103|1|1|LIST PRICE = $900.00EA|Y
01|226103|1|2|OVERSTOCK ELIGIBLE|Y
01|226105|1|1|SPINDLE DRAWING RQR'D|Y
01|226105|2|1|SPINDLE DRAWING RQR'D|Y
01|226105|12|1|QCFC80-35M-SMO|Y
01|226105|12|2|35mm SMOOTH ROUND 80 series collet|Y
01|226105|13|1|QCFC80-CUSTOM PROFILE-SQUARE|Y
01|226105|13|2|Square   .784 x .784 with outside corner relief of|Y
01|226105|13|3|.035 per side. Land dim = .714w X standard depth.|Y
01|226105|13|4|See customer drawing.|Y
01|226105|13|5|QT#225975; GP0=651|N
01|226105|17|1|Mimatic A200675 MA-I-40-ER25E DUAL Y-AXIS OUTPUT|Y
01|226105|17|2|MP610 MZQT46 TURRET|Y
01|226105|17|3|INCLUDES 2 WRENCHES. MIN ORDER 6 UNITS.|Y
01|226105|17|4|GP0=3838|N
01|226111|2|1|6 Gage\|Y
01|226120|1|1|RGA#CUR-61423/|Y
01|226120|1|2|Repair of H10ARAM-ER32-210OTC s/n: 45368 01|Y
01|226120|1|3|(Mimatci#166868)|Y
01|226120|2|1|Bearings seals and o-rings to be replaced.|Y
01|226128|1|1|RGA#CUR-61347/|Y
01|226128|1|2|Repair of C40RAM-MI50-180-65TP s/n: 23906132 01|Y
01|226128|1|3|(Mimatic#178151)|Y
01|226128|2|1|Bearings seals o-rings to be replaced.|Y
01|226139|1|1|SLIGHHTLY USED TRUNK STOCK MACHINE - GOOD CONDITION|Y
01|226141|2|1|Please note additional 20% applied per overstock promo.|Y
01|226141|2|2|These items cannot be cancelled or returned upon|Y
01|226141|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|226141|2|4|need to be requoted.|Y
01|226151|1|1|With pull stud PS-868 installed|Y
01|226151|1|2|Quoted at NET price|Y
01|226157|1|1|same as previous R.Table serial#1808.|Y
01|226157|1|2|same your previous PO#11-067560-W|Y
01|226157|1|3|6+1 RJ included|Y
01|226157|1|4|quoted as Net price|Y
01|226157|1|5|6 months for manufacturing upon approval drawing|Y
01|226157|1|6|After manufacturing it will be moved by Boat.|Y
01|226157|1|7|Inland freight (USA) is not included.|Y
01|226163|2|1|Full overhaul parts cost + Labor (For 2 Units)|Y
01|226163|2|2|Bearings/Seals/O-Rings/WScrew/WWheel and etc. included.|Y
01|226163|2|3|Labor + Expenses|Y
01|226163|2|4|Driving - 2 Days (20 hours round trip)|Y
01|226163|2|5|Working - 2 Days (Weekend Holidays Rate|Y
01|226163|2|6|Gas/Meals/Travel Expenses (Est) and etc included.|Y
01|226167|1|1|SPINDLE DRAWING RQR'D|Y
01|226167|2|1|SPINDLE DRAWING RQR'D|Y
01|226167|12|1|QCFC80-35M-SMO|Y
01|226167|12|2|35mm SMOOTH ROUND 80 series collet|Y
01|226167|13|1|QCFC80-CUSTOM PROFILE-SQUARE|Y
01|226167|13|2|Square   .784 x .784 with outside corner relief of|Y
01|226167|13|3|.035 per side. Land dim = .714w X standard depth.|Y
01|226167|13|4|See customer drawing.|Y
01|226167|13|5|QT#225975; GP0=651|N
01|226167|17|1|Mimatic A200675 MA-I-40-ER25E DUAL Y-AXIS OUTPUT|Y
01|226167|17|2|MP610 MZQT46 TURRET|Y
01|226167|17|3|INCLUDES 2 WRENCHES. MIN ORDER 6 UNITS.|Y
01|226167|17|4|GP0=3838|N
01|226170|2|1|Please note additional 20% applied per overstock promo.|Y
01|226170|2|2|These items cannot be cancelled or returned upon|Y
01|226170|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|226170|2|4|need to be requoted.|Y
01|226175|1|1|These are non-standard stock items and considered|Y
01|226175|1|2|specials. Once a PO has been issued these items cannot|Y
01|226175|1|3|be cancelled or returned. Please note ETA of 2/7.|Y
01|226193|2|1|Please note additional 20% applied per overstock promo.|Y
01|226193|2|2|These items cannot be cancelled or returned upon|Y
01|226193|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|226193|2|4|need to be requoted.|Y
01|226197|2|1|Additional 20% discount applied for our Overstock|Y
01|226197|2|2|Promotion.  Once a Purchase Order has been received|Y
01|226197|2|3|this item cannot be cancelled or returned.|Y
01|226209|1|1|Req.INS/Install A3/8-24 & 3/4-KEYSET/(1)996314|Y
01|226209|2|1|1st Batch/997428 Max Tool/Master Machine|Y
01|226209|3|1|1st Batch/997428 Max Tool/Master Machine|Y
01|226209|4|1|Req.INS/OD Groove frange Dia issue|Y
01|226209|5|1|1st Batch/995496 Treske 11/21:DWG APRVED|Y
01|226209|6|1|1st Batch/(3)994833 PTSol/Balon 11/18:DWG APRVED.|Y
01|226209|7|1|1st Batch/(3)994833 PTSol/Balon 11/18:DWG APRVED.|Y
01|226209|8|1|1st Batch/(3)995292 PTSol/Balon Corp 11/19:DWG APRVED|Y
01|226209|9|1|1st Batch/(3)995824 PTSol/Balon 11/25:DWG APRVED|Y
01|226209|10|1|Req.INS/Install E32-NUT|Y
01|226211|1|1|INCQ2501-0120 0012|Y
01|226215|1|1|RGA#LVR-61481/|Y
01|226215|1|2|Repair of MZMP47-ER32Z-ICE  s/n: 82927 02|Y
01|226215|1|3|(Mimatic#124864)|Y
01|226215|2|1|Bearings seals o-rings input & output spindles to be|Y
01|226215|2|2|replaced.|Y
01|226215|4|1|RGA#LVR-61482/|Y
01|226215|4|2|Repair of MZMP47-ER32Z-ICE  s/n: 86648 05|Y
01|226215|4|3|(Mimatic#124864)|Y
01|226215|5|1|Bearings seals o-rings input & output spindles and|Y
01|226215|5|2|threadring to be replaced.|Y
01|226219|1|1|Mazak VDI50 Live SPECIAL/CUSTOM OFFSET|Y
01|226219|1|2|part# TBD|Y
01|226219|1|3|For Mazak QT450MY and STN550M|Y
01|226236|3|1|Part#: C50RAM-ER40-215IC-100TP SP (Parts#: TBD)|Y
01|226236|3|2|CAT50 AngleHead ER40 110mm Pitch Tapered Pin|Y
01|226236|3|3|CTS Coolant Thru AH. NET Price.|Y
01|226236|3|4|Dimensions: A=110mm D=28mm Tooling interface: ER40|Y
01|226236|3|5|Reversal of rotation Length; L=230-235mm L1=105mm TBD|Y
01|226236|3|6|360 degree adjustable Gear Ratio: 1:1|Y
01|226236|3|7|Max Coolant Pressure: 70 bar Max Torque: 150Nm|Y
01|226236|3|8|Wrenches: ER40I + WRENCH-MIM-107566|Y
01|226236|3|9|*Lead time: 3 Weeks Design 12 weeks after signed|Y
01|226236|3|10|approval drawing.|Y
01|226242|1|1|This item is on the Lyndex-Nikken Overstock list.|Y
01|226242|1|2|I have added an extra 20% to the discount for you.|Y
01|226245|1|1|Final Part# TBD  **Quoted at NET Price**|Y
01|226245|1|2|1/2 Straight Shank Extension ER16|Y
01|226245|1|3|.|Y
01|226245|1|4|Please note: This is a custom special - cannot be|Y
01|226245|1|5|cancelled or returned upon receipt of PO|Y
01|226245|1|6|.|Y
01|226245|1|7|DELIVERY: ~16 weeks after approval drawing is signed|Y
01|226245|1|8|by the customer.|Y
01|226252|2|1|Price break for 2 pcs|Y
01|226255|1|1|Part# for OKU-L370-Z|Y
01|226258|2|1|Quoted at NET price|Y
01|226258|2|2|Non-returnable/Non-cancellable|Y
01|226258|7|1|Quoted at NET pricing|Y
01|226258|7|2|Non-returnable/Non-cancellable|Y
01|226261|18|1|Misc hoses and fittings for hydraulics|Y
01|226274|13|1|NB4001-0750-4.00CP|Y
01|226274|13|2|NBT40 DualContact Face Mill Holder - 3/4 Arbor 4 G/l|Y
01|226274|13|3|w/ CoolantPorts|Y
01|226274|13|4|*Please allow 1-2 weeks for approval drawing creation.|Y
01|226274|13|5|Lead time given as ADA - After Signed Drawing Approval.|Y
01|226274|14|1|NB4001-0750-6.00CP|Y
01|226274|14|2|NBT40 DualContact Face Mill Holder - 3/4 Arbor 6 G/l|Y
01|226274|14|3|w/ CoolantPorts|Y
01|226274|14|4|*Please allow 1-2 weeks for approval drawing creation.|Y
01|226274|14|5|Lead time given as ADA - After Signed Drawing Approval.|Y
01|226274|22|1|*Can possibly be expedited will check.|N
01|226280|1|1|This item goes with Line #2|Y
01|226280|2|1|This item goes with Line #1|Y
01|226286|1|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|226286|1|2|*Net price|Y
01|226291|1|1|Delivery is after signed aprroval drawing is submitted|Y
01|226292|5|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|226292|5|2|of spindle drawing information.|Y
01|226292|5|3|*NET price|Y
01|226300|4|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|226300|4|2|of spindle drawing information.|Y
01|226300|4|3|*NET price|Y
01|226312|1|1|Final Part# TBD  **Quoted at NET price**|Y
01|226312|1|2|CAT50 Shrink Fit Holder 6mm CoolantPorts 25K 8.00|Y
01|226312|1|3|gauge length|Y
01|226312|1|4|Please note: This is a special custom tool. It cannot|Y
01|226312|1|5|be cancelled or returned upon receipt of a PO.|Y
01|226312|1|6|.|Y
01|226312|1|7|DELIVERY: 10-11 Wks after approval design drawing is|Y
01|226312|1|8|signed by the customer.|Y
01|226315|1|1|Discount reflects a purchase order of 1~25 Holders.|Y
01|226315|2|1|Discount reflects a purchase order of 26~50 Holders.|Y
01|226315|3|1|Discount reflects a purchase order of 51+ Holders.|Y
01|226315|5|1|Discount reflects a purchase order of 1~25 Collets.|Y
01|226315|6|1|Discount reflects a purchase order of 26~50 Collets.|Y
01|226315|7|1|Discount reflects a purchase order of 51+ Collets.|Y
01|226315|9|1|Please Note: No charge for the wrenches.|Y
01|226345|6|1|Travel labor and necessary hardware to install a|Y
01|226345|6|2|rotary table trunnion assembly on a Haas VFX mill.|Y
01|226345|6|3|Installation timeline will be determined by Air-Way.|Y
01|226345|6|4|This is a net charge only no discounting applies.|Y
01|226347|7|1|KM2-1.1323  Special Straight Collet/Sleeve|Y
01|226347|7|2|OD 2 ID 1.1323|Y
01|226347|7|3|This collet is Special once a purchase order is|Y
01|226347|7|4|placed it cannot be cancelled or returned.|Y
01|226347|7|5|Minimum Order Quantity 2-pcs.|Y
01|226347|8|1|KM2-1.1323  Special Straight Collet/Sleeve|Y
01|226347|8|2|OD 2 ID 1.376|Y
01|226347|8|3|This collet is Special once a purchase order is|Y
01|226347|8|4|placed it cannot be cancelled or returned.|Y
01|226347|8|5|Minimum Order Quantity 2-pcs.|Y
01|226352|1|1|*Extra 20% discount given for Overstock Promo -|Y
01|226352|1|2|Non-cancellable and non-returnable once a PO has been|Y
01|226352|1|3|placed.|Y
01|226356|1|1|Req.INS/Install S3/8-24X5/16|Y
01|226356|2|1|Req.INS/Install S5/8-18X1/2|Y
01|226356|3|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|226356|4|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|226356|5|1|Req.INS/Install E40-NUT|Y
01|226356|6|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|226356|7|1|Req.INS/OD Groove frange Dia issue|Y
01|226362|16|1|*Not offered in coolant/sealed|Y
01|226362|17|1|Not offered in coolant/sealed|Y
01|226365|2|1|This is a service where Lyndex Nikken will assist in|Y
01|226365|2|2|the design and manufaturing of the positioning block|Y
01|226365|2|3|needed.  Customer will need to supply a spindle drawing|Y
01|226365|2|4|of machine head will be used on.  Net Charge Only.|Y
01|226366|13|1|A tariff surcharge may be added to this quotation in|Y
01|226366|13|2|the event of a sustained tariff increase on the|Y
01|226366|13|3|importation of this product.  Any surcharge will be|Y
01|226366|13|4|disclosed prior to acceptance of an order.|Y
01|226399|2|1|Master Jaw set for HW-06C-DOD-S|Y
01|226399|2|2|#14 Draw Bar Set|Y
01|226401|1|1|Discount reflects a purchase order of 1~5 holders.|Y
01|226401|2|1|Discount reflects a purchase order of 6~10 tools.|Y
01|226412|1|1|NC4001-22-4.00CP|Y
01|226412|1|2|NCAT40 DualContact 22mm Shell Mill Holder 4 G/L|Y
01|226412|1|3|w/ Coolant Ports.|Y
01|226412|1|4|Qty Break:  *NET pricing|Y
01|226412|1|5|2~5 pcs: $156.00/EA|Y
01|226412|1|6|*Lead time given as ADA - After Signed Drawing Approval|Y
01|226412|1|7|Please allow 1-2 weeks for creation of approval drawing|Y
01|226412|2|1|NC4001-22-2.00CP|Y
01|226412|2|2|NCAT40 DualContact Shell Mill Holder 22mm 2 G/l|Y
01|226412|2|3|w/ CoolantPorts|Y
01|226412|2|4|Qty Break:  *NET pricing|Y
01|226412|2|5|1-5 pcs: $162/EA|Y
01|226412|2|6|6+ pcs: $129/EA|Y
01|226412|2|7|Lead time given as ADA - After Signed Drawing Approval.|Y
01|226412|2|8|Please allow 1-2 weeks for an approval drawing to be|Y
01|226412|2|9|made.|Y
01|226414|1|1|HSK63A-SK25-90P HSK63A Slim Chuck SK25 Hi Speed|Y
01|226420|1|1|Please note additional 2% given per quantity breaks &|Y
01|226420|1|2|reflects PO for whole order and all pieces.|Y
01|226426|2|1|R/Table Inspection Service 1year pkg price.|Y
01|226426|2|2|2 L-N Service workers will attend.|Y
01|226426|2|3|Hotel charges are not included.|Y
01|226426|3|1|R/Table Inspection Service 3years pkg price.|Y
01|226426|3|2|2 L-N Service workers will attend.|Y
01|226426|3|3|Hotel charges are not included.|Y
01|226426|4|1|R/Table Inspection Service 5years pkg price.|Y
01|226426|4|2|2 L-N Service workers will attend.|Y
01|226426|4|3|Hotel charges are not included.|Y
01|226426|7|1|R/Table Check up & Oil change service 1yrs PKG Price.|Y
01|226426|7|2|3 L-N Service workers will attend.|Y
01|226426|7|3|Hotel charges are not included.|Y
01|226426|8|1|R/Table Check up & Oil change service 3yrs PKG Price.|Y
01|226426|8|2|3 L-N Service workers will attend.|Y
01|226426|8|3|Hotel charges are not included.|Y
01|226426|9|1|R/Table Check up & Oil change service 5yrs PKG Price.|Y
01|226426|9|2|3 L-N Service workers will attend.|Y
01|226426|9|3|Hotel charges are not included.|Y
01|226433|1|1|SPECIAL DISCOUNT FOR REMOVAL OF ADAPTER PLATE|Y
01|226433|1|2|LIST = $3403 LESS $675 FOR ADAPTER PLATE|Y
01|226433|1|3|ADD R-12B-SP-ADAPTER BACK TO INVENTORY|N
01|226433|1|4|NO ADAPTER PLATE INCLUDED!|Y
01|226433|2|1|ASME T&G Steel Softjaw Set of 3 pointed|Y
01|226433|2|2|Dillon Mfg DM20112P $63ea less 20% sold ea.|N
01|226433|2|3|3 pcs req. for set.|N
01|226433|2|4|For SK-12 Scroll Chuck mat=steel; pointed|Y
01|226434|1|1|Discount reflects Overstock item.|Y
01|226434|1|2|Tooling is non-returnable.|Y
01|226434|2|1|Discount reflects Overstock item.|Y
01|226434|2|2|Tooling is non-returnable.|Y
01|226442|10|1|**Quoted at NET price**|Y
01|226442|11|1|**Quoted at NET price**|Y
01|226442|12|1|**Quoted at NET price**|Y
01|226442|13|1|**Quoted at NET price**|Y
01|226444|1|1|Qty Breaks:|Y
01|226444|1|2|3+ Pcs: $2991.95/EA|Y
01|226444|1|3|5+ Pcs: $2761.80/EA|Y
01|226449|1|1|Part Number to be determined.|Y
01|226449|1|2|Quoted at NET price.|Y
01|226458|2|1|Power and Feedback Cables from the Nikken table to the|Y
01|226458|2|2|Machine Bulkhead|Y
01|226468|5|1|Full overhaul parts cost + Labor (For 2 R/Table)|Y
01|226468|5|2|Bearings/Seals/O-Rings/WScrew/WWheel and etc. included.|Y
01|226468|5|3|Labor + Expenses:|Y
01|226468|5|4|Driving - 2 Days (20 hours round trip)|Y
01|226468|5|5|Working - 2 Days (Weekend Holidays Rate|Y
01|226468|5|6|Gas/Meals/Travel Expenses (Est) and etc included.|Y
01|226468|5|7|Hotel expenses are not included.|Y
01|226473|1|1|Quote at NET pricing|Y
01|226473|1|2|Item is non-standard stock once PO has been|Y
01|226473|1|3|received it can not be cancelled or returned|Y
01|226474|2|1|Haas BMT65 Radial Shell Mill Holder 3/4 Pilot with|Y
01|226474|2|2|CoolantPorts.|Y
01|226474|2|3|Lead Time:|Y
01|226474|2|4|4 Weeks for Approval Drawing Production|Y
01|226474|2|5|10 Weeks ADA - After Signed Drawing Approval.|Y
01|226474|3|1|A tariff surcharge of 8% will be added to every order|Y
01|226474|3|2|placed after September 1st 2025(until further notice).|Y
01|226474|3|3|This surcharge will be acknowledged upon acceptance|Y
01|226474|3|4|of every order.|Y
01|226479|1|1|Quoted at NET pricing|Y
01|226492|1|1|INCLUDES AIR/HYDRAULIC BOOSTER FOR BRAKE|Y
01|226492|3|1|PVC COATED EXTERNAL POWER/FEEDBACK CABLES FOR|Y
01|226492|3|2|4TH AXIS ON OKUMA MILLAC 3.5M LONG|Y
01|226492|4|1|16 3-JAW SCROLL CHUCK AND ADAPTER PLATE|Y
01|226492|4|2|ALSO INCLUDES MOUNTING HARDWARE FOR CNC501|Y
01|226505|1|1|BT50-C3/4-135G-L160|Y
01|226505|1|2|BT50 3/4 ID Bore with 160mm insertion depth for 3/4|Y
01|226505|1|3|shank tool>> High Speed.|Y
01|226505|1|4|Quoted at NET price.Minimum order quantity 3-pcs.|Y
01|226505|2|1|BT50-C3/4-105G-L160|Y
01|226505|2|2|Net Price for 10+ holders.|Y
01|226505|3|1|Net price reflects Chip hole and BIS M-122-02/A|Y
01|226505|3|2|installation per Pratts drawing.|Y
01|226510|1|1|HW-08-HS-U74|Y
01|226510|1|2|Howa H037M8 Std Thru-Hole Chuck 3Jaw Flat Back 1.5mm|Y
01|226533|1|1|This is a non-standard stock item and considered|Y
01|226533|1|2|special. Once a PO has been issued it cannot be|Y
01|226533|1|3|cancelled or returned.|Y
01|226535|2|1|C/L H = 80mm|Y
01|226535|3|1|NKA01-60000|Y
01|226535|3|2|Alps 4:1 X Speeder for Nakamura NTJ-100/BMT44|Y
01|226535|3|3|*Non-cancellable and non-returnable once a PO has been|Y
01|226535|3|4|placed. Engineering fee will be charged if cancelled|Y
01|226535|3|5|before drawing approval. Please allow 1-2 Months for|Y
01|226535|3|6|Approval Drawing creation. Lead time given as ADA -|Y
01|226535|3|7|After Signed Drawing Approval.|Y
01|226535|3|8|*4:1 X speeder is extremely delicate even if for a|Y
01|226535|3|9|light duty project.|Y
01|226535|3|10|**Currently an estimate from our factory not final.|Y
01|226537|1|1|Additional special discount applied. Applicable for|Y
01|226537|1|2|a purchase of 16+ pieces only.|Y
01|226543|1|1|Please Note: This Pre-Setter is non standard stock.|Y
01|226543|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|226543|1|3|or returned.|Y
01|226543|7|1|Quoted at NET price.|Y
01|226550|3|1|4th & 5th axis Power and feedback from Nikken table to|Y
01|226550|3|2|machine bulkhead|Y
01|226556|4|1|Includes: Drive unit short bar fiber optic cable|Y
01|226556|4|2|parameter changes service time and travel.|Y
01|226575|1|1|CAT40 ER11 Extended gage length 12.5|Y
01|226579|1|1|Holders laser marked and labels printed with|Y
01|226579|1|2|Pratt & Whitney PT458202 REV-|Y
01|226579|1|3|Quoted at NET price.|Y
01|226581|1|1|CNC202LFA SN: 26502TCN|Y
01|226581|1|2|RGA#TAR-61201|Y
01|226587|1|1|This is a non-standard stock item and considered|Y
01|226587|1|2|special. Once a PO has been issued it cannot be|Y
01|226587|1|3|cancelled or returned.|Y
01|226612|1|1|REPLACEMENT TABLE ASSEMBLY W/ MOTOR|Y
01|226612|1|2|REFERENCE ORIGINAL SN: 9177|Y
01|226632|1|1|TAR-61496|SN:1261|Y
01|226639|2|1|**Quoted at NET Price**|Y
01|226639|2|2|This item is a discontinued special - it cannot be|Y
01|226639|2|3|cancelled or returned after receipt of PO.|Y
01|226639|6|1|Final Part# CAT50-C3/4-105U-IDU-DIN-M|Y
01|226639|6|2|CAT50 Milling Chuck 3/4 Chiphole 8K w/ 4-hole DIN Mod|Y
01|226639|6|3|**Quoted at NET Price**|Y
01|226639|6|4|This item is custom and cannot be cancelled or|Y
01|226639|6|5|returned upon receipt of PO|Y
01|226653|2|1|Placeholder for 5C collet with 49/64 square opening.|Y
01|226663|1|1|Net price includes the following parts for assembly|Y
01|226663|1|2|at Lyndex-Nikken: HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|226663|1|3|and customers RFID chip. Holders will be re-balanced.|Y
01|226663|2|1|Net price includes the following parts for assembly|Y
01|226663|2|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|226663|2|3|customer's supplied RFID chip and holder re-balanced.|Y
01|226663|3|1|Net price includes the following parts for assembly|Y
01|226663|3|2|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|226663|3|3|and customers RFID chips. Holders to be re-balanced.|Y
01|226663|4|1|Net price include the following parts for assembly|Y
01|226663|4|2|at Lyndex-Nikken: HSK63-Tube and customer's supplied|Y
01|226663|4|3|RFID chip and holder re-balanced.|Y
01|226672|1|1|Everything in stock besides the 500-008 (1/8)|Y
01|226672|1|2|Can ship incomplete set same day 500-008 is expected|Y
01|226672|1|3|by mid-February|Y
01|226684|2|1|Please Note: I have added an extra 20% to the discount|Y
01|226684|2|2|for the end mill holder which is on our Overstock|Y
01|226684|2|3|promotion. This item is non returnable.|Y
01|226698|1|1|This item is non-standard special stock. It cannot be|Y
01|226698|1|2|cancelled or returned upon receipt of a PO.|Y
01|226698|3|1|This item is non-standard special stock. It cannot be|Y
01|226698|3|2|cancelled or returned upon receipt of a pO.|Y
01|226709|1|1|Quoted at NET pricing|Y
01|226715|2|1|*Special and is non-returnable and non-cancellable.|Y
01|226733|1|1|Includes Haas motor and cable set.|Y
01|226735|2|1|ZQ35-16|Y
01|226738|2|1|These are non-standard stock items and considered|Y
01|226738|2|2|specials. Once a PO has been issued these items cannot|Y
01|226738|2|3|be cancelled or returned.|Y
01|226742|1|1|Includes: 5th axis rotary table with control and sheet|Y
01|226742|1|2|metal and 4th axis table for pallet two.|Y
01|226749|1|1|RGA#TAR-61519|5AX201YA|SN:5022|Y
01|226749|1|2|Full rebuild of the table include labor all basic|Y
01|226749|1|3|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|226750|2|1|This item is special non-standard stock. It cannot be|Y
01|226750|2|2|cancelled or returned once a PO is placed.|Y
01|226751|1|1|Req.INS/Alignment Check 998670/Drillmex|Y
01|226762|2|1|Please note additional 20% applied per overstock promo.|Y
01|226762|2|2|These items cannot be cancelled or returned upon|Y
01|226762|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|226762|2|4|need to be requoted.|Y
01|226762|4|1|CP - coolant ports attached is drawing|Y
01|226765|1|1|998940 T/P Inspection Requiredin stock>ESD1/21UPD1/15|Y
01|226765|2|1|998940 T/P Inspection Requiredin stock>ESD1/21UPD1/15|Y
01|226765|3|1|1st Batch/StockMFG9/30>12/30#3UPD11/21>>1/30A|N
01|226765|4|1|1st BatchMFG45working days(12/B)>1/15#1UPD1/2>>1/24A|N
01|226771|1|1|LN part# TBD  /Ref. Mimatic# 196429|Y
01|226771|1|2|Nakamura BMT65 Adjustable Angle Live Tool ER25 output|Y
01|226771|1|3|1:1 Gear Ratio 10K RPM 107 Adjustment ICE Version|Y
01|226771|1|4|Machine: Nakamura SC300|Y
01|226771|3|1|LN part# TBD  /Ref. Mimatic# 198855|Y
01|226771|3|2|Nakamura BMT65 Adjustable Angle Live Tool ER25 output|Y
01|226771|3|3|1:2 Gear Ratio 10K RPM 107 Adjustment ICE Version|Y
01|226771|3|4|Machine: Nakamura SC300|Y
01|226771|5|1|LN part# TBD  /Ref. Mimatic concept only 189683|Y
01|226771|5|2|Nakamura BMT65 Adjustable Angle Live Tool ER16 output|Y
01|226771|5|3|1:2 Gear Ratio 12K RPM 107 Adjustment ICE Version|Y
01|226771|5|4|Machine: Nakamura SC300|Y
01|226786|1|1|Includes cable set.|Y
01|226802|2|1|Final Part# C50RAM-MI63-215TS-110TP  **NET PRICING**|Y
01|226802|2|2|Delivery: 2-3 Wks for design plus 12 Wks for mfg &|Y
01|226802|2|3|shipping after an approval drawing is signed by the|Y
01|226802|2|4|customer.|Y
01|226802|2|5|**This item is a non-cancellable non-returnable custom|Y
01|226802|2|6|special tool**|Y
01|226802|2|7|.|Y
01|226802|2|8|Description: Mimatic 90deg 2-Spindle Head Type DW|Y
01|226802|2|9|Size 9 ANSI-CAT50 Tooling Interface-2x MI-63 Quick|Y
01|226802|2|10|Change System (MI-Inserts sold separately)|Y
01|226802|3|1|Delivery: 1 week after the receipt of spindle|Y
01|226802|3|2|measurements|Y
01|226802|3|3|Description: Mimatic 90deg 2-Spindle Head Type DW|N
01|226802|3|4|Size 9 ANSI-CAT50 Tooling Interface-2x MI-63 Quick|N
01|226802|3|5|Change System (MI-Inserts sold separately)|N
01|226802|11|1|**Quoted at NET price**|Y
01|226802|12|1|**Quoted at NET price**|Y
01|226802|13|1|**Quoted at NET price**|Y
01|226802|14|1|**Quoted at NET price**|Y
01|226802|19|1|Delivery: 1 week after the receipt of spindle|Y
01|226802|19|2|measurements|Y
01|226823|3|1|Includes: Drive unit cabinet cable bulkhead cables|Y
01|226823|3|2|and external cables.|Y
01|226823|4|1|Service charge per machine to install the drive unit|Y
01|226823|4|2|run cables and set parameters.|Y
01|226838|1|1|Service call for E68B s/n:2192|Y
01|226838|1|2|This is a time based estimate.|Y
01|226838|1|3|Any parts that would be required would be additional.|Y
01|226844|5|1|Wrench for std speed SK20|Y
01|226851|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|226860|4|1|4th Axis Interface: Includes Power and Feedback Cables|Y
01|226860|4|2|From Nikken 4th axis to Machine Bulk Head|Y
01|226860|4|3|Includes 4th Axis Servo Drive and wiring|Y
01|226864|1|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|226870|15|1|Could clamp on 10mm|Y
01|226870|16|1|Could clamp on 16mm|Y
01|226870|17|1|Could clamp on 28mm|Y
01|226870|19|1|QCFC65-10mm-SMO|Y
01|226870|20|1|QCFC65-16mm-SMO|Y
01|226870|21|1|QCFC65-22mm-SMO|Y
01|226870|22|1|QCFC65-28mm-SMO|Y
01|226873|1|1|match with SN#41641TC|Y
01|226873|1|2|includes the following accessories|Y
01|226873|1|3|TCE-A7026/9A cable|Y
01|226873|1|4|TCE-A94808/5 cable|Y
01|226873|1|5|TCD-A3515-R. 3+1PRJ|Y
01|226881|1|1|Similar Mimatic drawing # 00056554 /customer sketch|Y
01|226881|1|2|Net price for Hemaq|Y
01|226891|3|1|Everything in stock with exception of 160-050.|Y
01|226891|3|2|ETA is mid-February.|Y
01|226893|1|1|HSK25E-SK10-55P - HSK High Speed Slim Chuck|Y
01|226907|2|1|price break for 100 or more - less we reevaluate disc|Y
01|226907|3|1|Price break for qty 1000 or more- if less we reevaluate|Y
01|226909|3|1|8 weeks manufacturing after approval drawing.|Y
01|226909|3|2|These are considered specials and cannot be cancelled|Y
01|226909|3|3|or returned upon receipt of PO/order.|Y
01|226909|5|1|8 weeks manufacturing after approval drawing.|Y
01|226909|5|2|These are considered specials and cannot be cancelled|Y
01|226909|5|3|or returned upon receipt of PO/order.|Y
01|226909|8|1|These are considered specials and cannot be cancelled|Y
01|226909|8|2|or returned upon receipt of PO/order.|Y
01|226917|1|1|HSK63F ER32 4.00GL without drive pins|Y
01|226918|1|1|Added extra 5% demo unit discount to entire quote.|Y
01|226925|1|1|1159.60EUR + Handling Charge 10%|Y
01|226925|1|2|JPY 215200($1=157.00)|Y
01|226925|2|1|A tariff surcharge of 8% will be added to every order|Y
01|226925|2|2|placed after September 1st 2025(until further notice).|Y
01|226925|2|3|This surcharge will be acknowledged upon acceptance|Y
01|226925|2|4|of every order.|Y
01|226935|7|1|Net price|Y
01|226936|1|1|HSK63A-SK20C-120P-J|Y
01|226936|1|2|HSK63A Slim Chuck SK20 Coolant JetSlotNut HiSpeed 25K|Y
01|226936|9|1|HSK63A-C25-100|Y
01|226936|9|2|HSK63A Milling Chuck 25mm 8K|Y
01|226950|4|1|A tariff surcharge may be added to this quotation in|Y
01|226950|4|2|the event of a sustained tariff increase on the|Y
01|226950|4|3|importation of this product.  Any surcharge will be|Y
01|226950|4|4|disclosed prior to acceptance of an order.|Y
01|226952|2|1|km32-9/32|Y
01|226952|4|1|km32-17/64|Y
01|226952|5|1|km32-25/64|Y
01|226952|6|1|km32-19/64|Y
01|226952|7|1|km32-21/64|Y
01|226952|8|1|km32-23/64|Y
01|226953|3|1|VMK8-7J|Y
01|226959|1|1|Please note pricing applies to minimum order quantity|Y
01|226959|1|2|of 12 pieces. Additional promotions or discounts do not|Y
01|226959|1|3|apply.|Y
01|226965|1|1|Additional 20% Overstock Promo discount applied. This|Y
01|226965|1|2|item cannot be cancelled or returned.|Y
01|226967|1|1|Currently one (1) remaining in stock.  Item is being|Y
01|226967|1|2|discontinued.  Once a Purchase Order has been received|Y
01|226967|1|3|it cannot be cancelled or returned.|Y
01|226968|1|1|Includes Power and Feedback Cables from the Nikken|Y
01|226968|1|2|Table to the Machine Bulkhead|Y
01|226974|1|1|SPECIAL DISCOUNT; LIST = $782.00|Y
01|226980|1|1|2 stock/See above for delivery|Y
01|226981|1|1|Please note this is special non-standard stock. This|Y
01|226981|1|2|item cannot be cancelled or returned upon receipt of|Y
01|226981|1|3|a PO.|Y
01|226981|2|1|A tariff surcharge may be added to this quotation in|Y
01|226981|2|2|the event of a sustained tariff increase on the|Y
01|226981|2|3|importation of this product.  Any surcharge will be|Y
01|226981|2|4|disclosed prior to acceptance of an order.|Y
01|226983|7|1|Stock at Vendor.  ETA mid-February after receipt of|Y
01|226983|7|2|an order before Tuesday February 4th.|Y
01|227010|3|1|Final Sale|Y
01|227022|1|1|Currently 29 in stock ETA for balance of 9 will be|Y
01|227022|1|2|about 10~12 weeks.|Y
01|227026|1|1|3-4 weeks manufacturing time plus delivery.|Y
01|227048|1|1|INS Req'd 995355/Fastenal/Unverferth(IA) 11/22:DWG APRV|Y
01|227048|1|2|1/24RY: 1/28~30A(LY-2764) Reepat SP SN#Ata-0803|Y
01|227081|2|1|DISCOUNT REQUIRES CORE SX TOOL EXCHANGE|Y
01|227081|2|2|RETURN TOOL TO DANA SMITH|Y
01|227081|4|1|DISCOUNT REQUIRES CORE SX TOOL EXCHANGE|Y
01|227081|4|2|RETURN TOOL TO DANA SMITH|Y
01|227096|23|1|Final Part# SKJ16-7.5 **Quoted at NET price**|Y
01|227096|23|2|SK13/SK16 Coolant Cap 7.5mm Jet Slots|Y
01|227096|23|3|**Special non-standard stock. Cannnot be cancelled or|Y
01|227096|23|4|returned.|Y
01|227103|2|1|Additional 20% discount has been applied for our|Y
01|227103|2|2|Overstock Promotion.  Once a Purchase order has been|Y
01|227103|2|3|received this item cannot be cancelled or returned.|Y
01|227105|3|1|No sub plate is provided|Y
01|227109|8|1|L-N Sales Rep will provide INST support and Basic|Y
01|227109|8|2|training on site.|Y
01|227110|9|1|L-N Sales Rep will provide INST support and Basic|Y
01|227110|9|2|training on site.|Y
01|227112|1|1|Qty Breaks:|Y
01|227112|1|2|Qty 3+: $1760|Y
01|227112|1|3|Qty 6+: $1650|Y
01|227112|1|4|Qty 18+: $1625|Y
01|227113|2|1|SPECIAL DISCOUNT APPLIED FOR CONSIGNMENT SALE|Y
01|227113|2|2|FROM ELLISON FLOOR|Y
01|227113|4|1|We will need a PO to transfer ownership.  This will not|Y
01|227113|4|2|be invoiced until a change of ownership occurs to EU|Y
01|227113|4|3|or is returned to Lyndex-Nikken for credit memo.|Y
01|227113|4|4|Ellison will be responsible for inbound and outbound|Y
01|227113|4|5|Freight.|Y
01|227113|4|6|Ellison is responsible for retaining all packaging|Y
01|227113|4|7|materials.|Y
01|227113|4|8|We will stand by this for 12 months.  After that time|Y
01|227113|4|9|we'll assess the effectiveness of the consignment|Y
01|227113|4|10|and your needs moving forward.|Y
01|227118|1|1|Rotary Union H09C130K-675|Y
01|227141|2|1|external power and feedback cables from the nikken|Y
01|227141|2|2|table to Machine Bulkhead|Y
01|227150|2|1|A tariff surcharge may be added to this quotation in|Y
01|227150|2|2|the event of a sustained tariff increase on the|Y
01|227150|2|3|importation of this product.  Any surcharge will be|Y
01|227150|2|4|disclosed prior to acceptance of an order.|Y
01|227162|10|1|A tariff surcharge may be added to this quotation in|Y
01|227162|10|2|the event of a sustained tariff increase on the|Y
01|227162|10|3|importation of this product.  Any surcharge will be|Y
01|227162|10|4|disclosed prior to acceptance of an order.|Y
01|227179|1|1|33.3 RPM|Y
01|227179|2|1|66.6 RPM|Y
01|227199|1|1|ZK38-1.1/2U|Y
01|227199|1|2|ZK38 Torque Control Tap Collet 1.1/2|Y
01|227200|1|1|TNKQ2501-1038 0001...placeholder for Nikken/Walter 80MM|Y
01|227200|1|2|F4080.B27.080DC.Z07.03 - 80MM|Y
01|227200|3|1|TNKQ2501-1038 0002...|Y
01|227200|5|1|TNKQ2501-1038 0003...|Y
01|227200|7|1|TNKQ2501-1038 0004...|Y
01|227200|9|1|TNKQ2501-1038 0005...|Y
01|227200|11|1|TNKQ2501-1038 0006...|Y
01|227200|13|1|TNKQ2501-1038 0007...|Y
01|227200|15|1|TNKQ2501-1038 0008...placeholder for Nikken black pull|Y
01|227200|15|2|stud BT30-B M12 45|Y
01|227200|17|1|TNKQ2501-1038 0009...|Y
01|227200|19|1|TNKQ2501-1038 0010...|Y
01|227200|21|1|TNKQ2501-1038 0011...|Y
01|227200|23|1|TNKQ2501-1038 0012...|Y
01|227200|25|1|TNKQ2501-1038 0013...|Y
01|227200|27|1|TNKQ2501-1038 0014...|Y
01|227200|29|1|TNKQ2501-1038 0015...|Y
01|227200|31|1|TNKQ2501-1038 0016...|Y
01|227200|33|1|TNKQ2501-1038 0017...|Y
01|227200|35|1|TNKQ2501-1038 0018...|Y
01|227200|37|1|TNKQ2501-1038 0019...|Y
01|227200|39|1|TNKQ2501-1038 0020...|Y
01|227200|41|1|TNKQ2501-1038 0021...|Y
01|227200|43|1|TNKQ2501-1038 0022...|Y
01|227200|45|1|TNKQ2501-1038 0023...|Y
01|227200|47|1|TNKQ2501-1038 0024...|Y
01|227200|49|1|TNKQ2501-1038 0025...|Y
01|227200|51|1|TNKQ2501-1038 0026...|Y
01|227200|53|1|TNKQ2501-1038 0027...|Y
01|227200|55|1|TNKQ2501-1038 0028...|Y
01|227200|57|1|TNKQ2501-1038 0029...|Y
01|227200|59|1|TNKQ2501-1038 0030...|Y
01|227200|61|1|TNKQ2501-1038 0031...|Y
01|227200|63|1|TNKQ2501-1038 0032...placeholder for Schunk Tendo|Y
01|227200|63|2|SDF JIS BT30 D20|Y
01|227200|65|1|TNKQ2501-1038 0033...placeholder for Schunk Hidrolik|Y
01|227200|65|2|GZB-S-20/3/50.5|Y
01|227200|67|1|TNKQ2501-1038 0034...placeholder for Schunk Hidrolik|Y
01|227200|67|2|GZB-S-20/4/50.5|Y
01|227200|69|1|TNKQ2501-1038 0035...placeholder for Schunk Hidrolik|Y
01|227200|69|2|GZB-S-20/5/50.5|Y
01|227200|71|1|TNKQ2501-1038 0036...placeholder for Schunk Hidrolik|Y
01|227200|71|2|GZB-S-20/6/50.5|Y
01|227200|73|1|TNKQ2501-1038 0037...placeholder for Schunk Hidrolik|Y
01|227200|73|2|GZB-S-20/8/50.5|Y
01|227200|75|1|TNKQ2501-1038 0038...placeholder for Schunk Hidrolik|Y
01|227200|75|2|GZB-S-20/10/50.5|Y
01|227200|77|1|TNKQ2501-1038 0039...placeholder for Schunk Hidrolik|Y
01|227200|77|2|GZB-S-20/12/50.5|Y
01|227200|79|1|TNKQ2501-1038 0040...placeholder for Schunk Hidrolik|Y
01|227200|79|2|GZB-S-20/16/50.5|Y
01|227203|6|1|A tariff surcharge may be added to this quotation in|Y
01|227203|6|2|the event of a sustained tariff increase on the|Y
01|227203|6|3|importation of this product.  Any surcharge will be|Y
01|227203|6|4|disclosed prior to acceptance of an order.|Y
01|227208|2|1|Please note this is special non-standard stock. This|Y
01|227208|2|2|item cannot be cancelled or returned.|Y
01|227208|17|1|Please note this is special non-standard stock. This|Y
01|227208|17|2|item cannot be cancelled or returned.|Y
01|227210|6|1|A tariff surcharge may be added to this quotation in|Y
01|227210|6|2|the event of a sustained tariff increase on the|Y
01|227210|6|3|importation of this product.  Any surcharge will be|Y
01|227210|6|4|disclosed prior to acceptance of an order.|Y
01|227215|1|1|TAC Rockford Item # 440.135-K63.IGX|Y
01|227215|1|2|KM 63 Tool Changer Alignment Gauge - Mazak Integrex|Y
01|227224|1|1|ZKG12-8D7(DIN371) Nikken Tap Collet|Y
01|227224|1|2|Tap Shank 8mm X Tap Shank 6.2mm|Y
01|227224|1|3|Quoted at NET price.|Y
01|227232|3|1|Item qualifies for additional 20% OVERSTOCK discount|Y
01|227232|3|2|Discount has been added to standard 35% discount|Y
01|227232|3|3|Final Sale|Y
01|227241|1|1|Double Spindle offset ER20 similar to D. 000177440|Y
01|227241|1|2|Net price for Hemaq  Minimum Qty order of 2 pcs|Y
01|227241|2|1|Double Spindle 180 degrees opposite ER32|Y
01|227241|2|2|net price for Hemaq Minimun qty order 2 pcs|Y
01|227241|3|1|double Spindle straight ER25 along Y axis|Y
01|227241|3|2|Net price for Hemaq|Y
01|227247|6|1|*Remove ICE. External Coolant only|Y
01|227247|7|1|*Remove ICE. External Coolant only|Y
01|227249|1|1|TAR-61534|Y
01|227249|1|2|5AX-2MT-105-FA|Y
01|227249|1|3|SN:8101|Y
01|227251|1|1|CCT25-19-330|Y
01|227258|4|1|NCAT40-SF8-130CP|Y
01|227258|4|2|NCAT40 DualContact Shrink Fit Holder 8mm 25K w/ CP|Y
01|227265|1|1|Please note: This is special non-standard stock. This|Y
01|227265|1|2|item cannot be cancelled or returned after receipt of|Y
01|227265|1|3|PO.|Y
01|227265|1|4|.|Y
01|227265|1|5|DELIVERY: 2 pcs 1-2 Weeks ARO. Balance 1-2 Weeks ARO|Y
01|227265|1|6|after 3/13.|Y
01|227267|1|1|CNC401LFA SN:12594 with special face plate|Y
01|227267|2|1|TAT-401N support table with special face plate|Y
01|227267|3|1|TCD-72067/4 9+1P RJ built in|Y
01|227267|4|1|TCD-37320/2 6+1P RJ built in type|Y
01|227269|1|1|NC5006-1500-2.25 NCAT50 DualContact|Y
01|227269|1|2|1.1/2 Stub Lenth ChipHole|Y
01|227269|1|3|Quoted at NET price.|Y
01|227269|1|4|1|N
01|227271|1|1|NBT50-FMH27-76-200  NBT50 Dual Contact Shell Mill|Y
01|227271|1|2|Holder 27mm|Y
01|227271|2|1|BT50-FMH27-76-200 BT50 Shell Mill Holder 27mm|Y
01|227292|6|1|CUSTOMER POSITIONING BLOCK FOR CAT50 MACHINE|Y
01|227292|6|2|DIMENSIONS WILL BE TAKEN OFF SPINDLE FACE BEFORE|Y
01|227292|6|3|BLOCK IS MADE AND SHIPPED TO CUSTOMER|Y
01|227293|1|1|RGA#LVR-61507/|Y
01|227293|1|2|Repair of T32336 s/n: n/a|Y
01|227293|2|1|Bearings o-rings collet nut drive shaft and spindle|Y
01|227293|2|2|to be replaced.|Y
01|227298|3|1|Includes: Drive unit short bar fiber optic cable|Y
01|227298|3|2|communications cable bulkhead cables external cables|Y
01|227298|3|3|parameter changes service time and travel.|Y
01|227308|1|1|Final Part# HSK100A-PE-M10-137 **Quoted at NET Price**|Y
01|227308|1|2|HSK100A to M10 holder 137mm GL|Y
01|227308|1|3|5 Pc Minimum Order Quantity|Y
01|227308|1|4|QTY BREAK PRICING:|Y
01|227308|1|5|5 pcs: $182.00/ea|Y
01|227308|1|6|6+pcs: $172.00/ea|Y
01|227308|3|1|Final Part# HSK100A-PE-M10-179 **Quoted at NET price**|Y
01|227308|3|2|HSK100A to M10 holder 179mm Gauge Length|Y
01|227308|3|3|5 Pc Minimum Order Quantity|Y
01|227308|3|4|QTY BREAK PRICING:|Y
01|227308|3|5|5 pcs: $216/ea|Y
01|227308|3|6|6+pcs: $206/ea|Y
01|227310|12|1|*Wrench for TG100 Collet Chucks|Y
01|227322|1|1|NCAT40-SK16C-280-IDU|Y
01|227322|1|2|Quoted 1~9 Holders Net Each|Y
01|227322|1|3|10+ Holders  $934.00 Net Each|Y
01|227322|2|1|NCAT40-SK16C-300U-IDU|Y
01|227322|2|2|NCAT40 DualContact Slim Chuck SK16 Coolant Chip Hole|Y
01|227322|2|3|Quoted 1~9 Holders Net Price|Y
01|227322|2|4|10+ Holders $956.00 Net Each|Y
01|227322|3|1|NCAT40-SK20C-280U-IDU|Y
01|227322|3|2|NCAT40 DualContact Slim Chuck SK20 CoolantW/Chip Hole|Y
01|227322|3|3|Quoted 1~9 Holders Net Price|Y
01|227322|3|4|10+ Holders $988.00 Net Each|Y
01|227322|4|1|NCAT40-SK20C-300-IDU|Y
01|227322|4|2|NCAT40 DualContact Slim Chuck SK20 CoolantW/Chip Hole|Y
01|227322|4|3|Quoted 1~9 Holders Net Price|Y
01|227322|4|4|10+ Holders $988.00 Net Each|Y
01|227322|6|1|NC4001-0750-300MM CP|Y
01|227322|6|2|NCAT40 DualContact Shell Mill Holder 3/4 CoolantPorts|Y
01|227322|6|3|Quoted at Net price Minimum order quantity 3 holders.|Y
01|227322|7|1|NC4001-22-300CP|Y
01|227322|7|2|NCAT40 DualContact Shell Mill Holder 22mm CoolantPorts|Y
01|227322|7|3|Quoted at Net price Minimum order quantity 3 holders.|Y
01|227325|1|1|TAR-61335|Y
01|227325|1|2|CNC180-LFA|Y
01|227325|1|3|SN:10692|Y
01|227325|24|1|Replacement:PE911-1401-002-00PE911-1401-003-00|Y
01|227325|24|2|Black plastic conduit not stainless steel braided|Y
01|227325|25|1|Evaluation of Servo Motor|Y
01|227326|1|1|This is a Net cost only for modifying the customer's|Y
01|227326|1|2|existing CNC260FA-M to a CNC260MA-M.  Customer is|Y
01|227326|1|3|removing the CNC260 from a Robodrill and will have us|Y
01|227326|1|4|re-install the modified CNC260MA-M on their new Mirco|Y
01|227326|1|5|Dynamic machine.  This is for parts and labor to|Y
01|227326|1|6|convert the motor and wiring from Fanuc to Mits.|Y
01|227326|1|7|The current table is set up with only air for braking.|Y
01|227326|2|1|We will install the customers converted CNC260MA-M and|Y
01|227326|2|2|their existing TAT outboard support on their new Micro|Y
01|227326|2|3|Dynamic VMC.|Y
01|227339|1|1|RGA#CUR-61538/|Y
01|227339|1|2|Repair of C40RAM-ER32-200OT-65TP s/n: 64155 01|Y
01|227339|1|3|(Mimatic#178117)|Y
01|227339|2|1|Bearings seals o-rings and damaged output spindle to|Y
01|227339|2|2|be replaced.|Y
01|227344|1|1|ROTARY TABLE SETUP FOR FULL HYDRAULIC BRAKE SYSTEM|Y
01|227344|2|1|FULL HYDRAULIC BRAKE SETUP|Y
01|227344|3|1|STANDARD 1000 PSI ROTARY JOINT 8+1 PORTS|Y
01|227351|1|1|P/N: H80F-SF0250-6.00|Y
01|227351|1|2|HSK80F Taper 1/4 Shrink Fit holder w/ 6.00 g.l.|Y
01|227351|1|3|WITH Makino Pins|Y
01|227351|3|1|P/N: H80F-SF0250-6.00CP|Y
01|227351|3|2|HSK80F Taper 1/4 Shrink Fit - 6 GL & coolant ports.|Y
01|227351|3|3|WITH Makino Pins|Y
01|227355|1|1|Req.INS/Check Alingment|Y
01|227366|1|1|RRSS-19.062F-S19.05(+.003/-0.002)|Y
01|227366|1|2|Carbide Radical Reamer ST Shank|Y
01|227366|1|3|Qty Breaks: (NET)|Y
01|227366|1|4|1-2 Pcs: $742/EA|Y
01|227366|1|5|3-4 Pcs: $713/EA|Y
01|227366|1|6|5-9 Pcs: $685/EA|Y
01|227366|1|7|10+ Pcs: $657/EA|Y
01|227366|1|8|*Lead time given as ADA - After Signed Drawing Approval|Y
01|227366|1|9|Please allow 1-2 weeks for an approval dwg to be made.|Y
01|227366|2|1|RSS-19.062F-S19.05(+.003/-0.002)|Y
01|227366|2|2|High-Speed Steel Reamer|Y
01|227366|2|3|Qty Breaks: (NET Pricing)|Y
01|227366|2|4|1-2 Pcs: $397/EA|Y
01|227366|2|5|3-4 Pcs: $382/EA|Y
01|227366|2|6|5-9 Pcs: $370/EA|Y
01|227366|2|7|10+ Pcs: $350/EA|Y
01|227366|2|8|*Lead time given as ADA - After Signed Drawing Approval|Y
01|227366|2|9|Please allow 1-2 weeks for an approval dwg to be made.|Y
01|227368|1|1|TAR-61556|Y
01|227368|1|2|CNCZ180LSA-BR2-QT/R45|Y
01|227368|1|3|SN:20282T|Y
01|227380|2|1|**NET Price**|Y
01|227380|2|2|LN to thread blank draw screw|Y
01|227380|3|1|A tariff surcharge may be added to this quotation in|Y
01|227380|3|2|the event of a sustained tariff increase on the|Y
01|227380|3|3|importation of this product.  Any surcharge will be|Y
01|227380|3|4|disclosed prior to acceptance of an order.|Y
01|227383|2|1|Includes two Nikken stand alone controllers with|Y
01|227383|2|2|cables pendents for programming M-code cables|Y
01|227387|1|1|CNC401LFA SN:12594 with special face plate|Y
01|227387|1|2|Net price for Yamazen|Y
01|227387|2|1|TAT-401N support table with special face plate|Y
01|227387|2|2|Net Price for Yamazen|Y
01|227387|3|1|TCD-72067/4 9+1P RJ built in|Y
01|227387|3|2|Net price for Yamazen|Y
01|227387|4|1|TCD-37320/2 6+1P RJ built in type|Y
01|227387|4|2|Net Price for Yamazen|Y
01|227387|6|1|Net price for Yamazen|Y
01|227387|8|1|Rebuild Kit: Worm Screw Worm Wheel Bearings seals|Y
01|227387|8|2|Net Price for Yamazen|Y
01|227392|5|1|A tariff surcharge may be added to this quotation in|Y
01|227392|5|2|the event of a sustained tariff increase on the|Y
01|227392|5|3|importation of this product.  Any surcharge will be|Y
01|227392|5|4|disclosed prior to acceptance of an order.|Y
01|227394|4|1|Machine spindle / ATC interface drawing required.|Y
01|227394|4|2|Application approval and questionaire required.|Y
01|227394|4|3|...Contact Dana Smith for assistance with completing|Y
01|227394|4|4|...these steps.  Thanks!|Y
01|227397|1|1|There are 10pcs in stock at L-N. Balance(15pcs) is|Y
01|227397|1|2|expected to arrive L-N by Feb 9th.|Y
01|227397|1|3|Net price.|Y
01|227398|1|1|BT50-C1-90 BT50 Milling Chuck 1|Y
01|227398|1|2|Net Pricing reflects minimum order of 1 to 9 holders.|Y
01|227398|1|3|10+ holders $688.00 Net Price|Y
01|227420|1|1|LN Part# TBD|Y
01|227420|1|2|Mimatic Part#: 197605|Y
01|227420|1|3|BMT75 Capto C5 STRT Live Tool|Y
01|227420|2|1|LN Part#: TBD|Y
01|227420|2|2|Mimatic Part#: 197607|Y
01|227420|2|3|BMT75 Capto C5 90D Live Tool|Y
01|227420|3|1|LN Part#: TBD|Y
01|227420|3|2|Mimatic Part#: 196402|Y
01|227420|3|3|BMT75 ER40 STRT Live Tool|Y
01|227420|4|1|LN Part#: TBD|Y
01|227420|4|2|Mimatic Part#: 196402|Y
01|227420|4|3|BMT75 ER40 90D Live Tool|Y
01|227422|1|1|No Inspection Required|Y
01|227422|2|1|No Inspection Required|Y
01|227422|3|1|No Inspection Required|Y
01|227425|9|1|A tariff surcharge may be added to this quotation in|Y
01|227425|9|2|the event of a sustained tariff increase on the|Y
01|227425|9|3|importation of this product.  Any surcharge will be|Y
01|227425|9|4|disclosed prior to acceptance of an order.|Y
01|227432|1|1|Installation NOT Included with this price|Y
01|227434|1|1|RGA#LVR-61549/|Y
01|227434|1|2|Repair of MZMP46-ER32Z-C s/n: 67932 05 (Mimatic#124854)|Y
01|227434|2|1|Bearings seals o-rings damaged input & output|Y
01|227434|2|2|spindles to be replaced.|Y
01|227434|4|1|RGA#LVR-61549/|Y
01|227434|4|2|Repiar of MZMP46-ER32Z-C s/n: 67932 10 (Mimatic#124854)|Y
01|227434|5|1|Bearings seals o-rings damaged input & output|Y
01|227434|5|2|spindles to be replaced.|Y
01|227434|7|1|RGA#LVR-61550/|Y
01|227434|7|2|Repair of MZMP46-ER32Z-C s/n:41340 03 (Mimatic#124854)|Y
01|227434|8|1|Bearings seals o-rings damaged input & output|Y
01|227434|8|2|spindles to be replaced.|Y
01|227440|1|1|Bare table use customer motor(SN:10692)|Y
01|227440|2|1|Replacement:PE911-1401-002-00PE911-1401-003-00|Y
01|227440|2|2|Black plastic conduit not stainless steel braided|Y
01|227447|1|1|Ext Cable FeedBk R-Ax 3M Meldas/Mitsubishi R-Ax ST90|Y
01|227447|2|1|Ext Cable FeedBk T-Ax 3M Meldas/Mitsubishi ST90|Y
01|227453|1|1|This item qualifies for Overstock discount of|Y
01|227453|1|2|additional 20% added to standard discount. Final Sale|Y
01|227456|3|1|Installation includes: Drive unit short bar fiber|Y
01|227456|3|2|optic cable communications cable bulhead cables|Y
01|227456|3|3|external cables parameter changes service time and|Y
01|227456|3|4|travel.|Y
01|227464|3|1|Base Plate for existing trunnion for VF3|Y
01|227464|4|1|2 riser for rotary table and outboard support|Y
01|227464|4|2|A36 HRS fully annealed blanchard and finish ground.|Y
01|227464|8|1|2 riser for rotary table and outboard support|Y
01|227464|8|2|A36 HRS fully annealed blanchard and finish ground.|Y
01|227464|10|1|A tariff surcharge may be added to this quotation in|Y
01|227464|10|2|the event of a sustained tariff increase on the|Y
01|227464|10|3|importation of this product.  Any surcharge will be|Y
01|227464|10|4|disclosed prior to acceptance of an order.|Y
01|227465|1|1|TAR-61559|Y
01|227465|1|2|5AX-201FA-M-AB|Y
01|227465|1|3|SN: 5111|Y
01|227465|28|1|Tilt Side External Cable|Y
01|227472|1|1|These are non-standard stock items and considered|Y
01|227472|1|2|specials. Once a PO has been issued these items cannot|Y
01|227472|1|3|be cancelled or returned.|Y
01|227478|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|227478|4|1|INCLUDES FULL INSTALLATION ASIDE FROM TILTED|Y
01|227478|4|2|WORKPLANE SETUP THAT WILL BE DONE BY ELLISON|Y
01|227484|4|1|THIS INCLUDES 15 FORGED STEEL 3 JAW CHUCK 8.6 TH|Y
01|227484|4|2|JAWS ARE 2 PIECE AND ADAPTER PLATE FOR CNCB450T|Y
01|227486|1|1|HSK40E-ER11-80 Minimum Order Quantity = 10|Y
01|227486|2|1|HSK40E-ER11-100 Minimum Order Quantity = 10|Y
01|227486|4|1|HSK40E-ER16-80 Minimum Order Quantity = 10|Y
01|227486|5|1|HSK40E-ER16-100 Minimum Order Quantity = 10|Y
01|227486|7|1|One for each holder|Y
01|227487|1|1|Purchase of new CNC180FA-M $16905.00ea|Y
01|227487|1|2|Minus Core Deposit of CNC150  -$1500.00|Y
01|227487|1|3|Net Total $15405.00|Y
01|227488|1|1|Union Special one time special demo table price with|Y
01|227488|1|2|core deposit of the old table.|Y
01|227488|2|1|Morris Midwest special one time price for demo table.|Y
01|227505|4|1|A tariff surcharge may be added to this quotation in|Y
01|227505|4|2|the event of a sustained tariff increase on the|Y
01|227505|4|3|importation of this product.  Any surcharge will be|Y
01|227505|4|4|disclosed prior to acceptance of an order.|Y
01|227514|1|1|HSK63T-SLT12-85|Y
01|227514|1|2|Quoted at NET pricing. Non-cancellable/non-returnable.|Y
01|227519|1|1|CNC260FA-10+1|Y
01|227519|1|2|match s/n.13941  w/o  Direct mount Cable and Motor|Y
01|227519|1|3|with  special face plate|Y
01|227519|3|1|TCD-C4549 10+1p RJ  Built-In|Y
01|227520|1|1|CNC260FA-10+1RJ  TCA-C4938  SN: 14716-14719 Enshu GE30V|Y
01|227520|1|2|Special Design Face Plate TCF-C4251-T/0|Y
01|227520|1|3|Special Order. Unit Price. No Cancelation Accepted.|Y
01|227520|2|1|TCD-C4549-R/2 10+1RJ Built-In|Y
01|227520|3|1|CST101-135-4+1RJ  TCD-37402-R/34+1RJ Built-in|Y
01|227520|3|2|Special Order. Unit Price. No Cancelation Accepted.|Y
01|227522|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|227523|1|1|HSK63T-SLT12-85|Y
01|227523|1|2|Quoted at NET pricing. Non-cancellable/non-returnable.|Y
01|227526|1|1|1pc  $9981.00 less 30% = $6986.70ea/net|Y
01|227526|1|2|2pc  $9981.00 less 34% = $6587.46ea/net|Y
01|227526|1|3|Special quantity break pricing applied.|Y
01|227526|1|5|Please note clearances need to be checked in the ATC.|Y
01|227527|1|1|There are 10pcs in stock at L-N. Balance(15pcs) is|Y
01|227527|1|2|expected to arrive L-N by Feb 9th.|Y
01|227527|1|3|Net price.|Y
01|227527|2|1|Minimum Order Qty: 50+|Y
01|227527|3|1|Minimum Order Qty: 100+|Y
01|227528|4|1|NIT40N-MDPE-M16-95|Y
01|227537|3|1|Item qualifies for addtional 20% disccount added to|Y
01|227537|3|2|your standard 35%.|Y
01|227541|1|1|P/N: TBD|Y
01|227541|1|2|NBT30 DualContact Shrink-Fit 8mm Mold Type 105mm G/l|Y
01|227541|1|3|Qty Breaks: (*NET Price)|Y
01|227541|1|4|2-4 pcs: $538.00|Y
01|227541|1|5|5-9 pcs: $350.00|Y
01|227541|1|6|10+ pcs: $245.00|Y
01|227541|1|7|*Lead time given as ADA - After Signed Drawing Approval|Y
01|227541|1|8|Please allow 1-2 weeks for creation of approval dwg.|Y
01|227541|2|1|A tariff surcharge may be added to this quotation in|Y
01|227541|2|2|the event of a sustained tariff increase on the|Y
01|227541|2|3|importation of this product.  Any surcharge will be|Y
01|227541|2|4|disclosed prior to acceptance of an order.|Y
01|227549|5|1|A tariff surcharge may be added to this quotation in|Y
01|227549|5|2|the event of a sustained tariff increase on the|Y
01|227549|5|3|importation of this product.  Any surcharge will be|Y
01|227549|5|4|disclosed prior to acceptance of an order.|Y
01|227552|4|1|Please note RFQ on item 2 has been discontinued.|Y
01|227552|4|2|Included are our 2 & 4 gage length options.|Y
01|227557|1|2|FOR HW KF5600 FANUC Oi-MF+|Y
01|227557|3|1|TABLE ORDER INCLUDES $1500 TOOLING CERT. FOR|Y
01|227557|3|2|STANDARD OR ADVANCED SPINDLE TOOLING|Y
01|227557|3|3|IN STOCK PRODUCT ONLY|Y
01|227559|1|1|Part# TBD **Quoted at NET Price** MOQ 3 pcs|Y
01|227559|1|2|Dual-Contact CAT50 C6 output 3.00 Projection|Y
01|227559|1|3|BCV50-C6-3-OHA  **PRICE INCLUDES LOCKING PIN**|Y
01|227559|1|4|.|Y
01|227559|1|5|QTY Break Pricing:|Y
01|227559|1|6|3-4 pcs: $1749.00/ea|Y
01|227559|1|7|5-9 pcs: $1247.00/ea|Y
01|227559|1|8|10-15 pcs: $838.00/ea|Y
01|227559|1|9|16-24 pcs: $807.00/ea|Y
01|227560|2|1|Please Note: The above tool is on our Overstock list.|Y
01|227560|2|2|I have added the extra 20% to the discount and this|Y
01|227560|2|3|item is non-returnable.|Y
01|227568|2|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|227568|2|2|of spindle drawing information.|Y
01|227568|2|3|*NET Price|Y
01|227587|1|1|Mimatic Part # 102771 for OKUMA VTL-100|Y
01|227587|1|2|SPECIAL-TL x 2 >>> Net $12635.00|Y
01|227587|1|3|SPECIAL-TL x 5 >>> Net $11190.00|Y
01|227603|1|1|R/Table: CNC180 + Tail stock  Qty. 24 units|Y
01|227603|1|2|Refference SN: 28466T|Y
01|227603|1|3|Special Discount will be applied to first time order.|Y
01|227603|1|4|Expiration date: End of April 2025|Y
01|227605|4|1|A tariff surcharge may be added to this quotation in|Y
01|227605|4|2|the event of a sustained tariff increase on the|Y
01|227605|4|3|importation of this product.  Any surcharge will be|Y
01|227605|4|4|disclosed prior to acceptance of an order.|Y
01|227627|2|1|Installing chip #BIS-C-122-04/L.|Y
01|227628|1|1|RGA#CUR-61575/|Y
01|227628|1|2|Repair of C40RA-0025M s/n:18902340 04 (Mimatic#175241)|Y
01|227628|2|1|Bearings seals o-rings damaged gears & damages input|Y
01|227628|2|2|& output spindles to be replaced.|Y
01|227630|1|1|Please note this is special non-standard stock. Once|Y
01|227630|1|2|a PO is placed this cannot be cancelled or returned.|Y
01|227630|4|1|A tariff surcharge may be added to this quotation in|Y
01|227630|4|2|the event of a sustained tariff increase on the|Y
01|227630|4|3|importation of this product.  Any surcharge will be|Y
01|227630|4|4|disclosed prior to acceptance of an order.|Y
01|227653|1|1|Discount: 50~99 pieces >> 40%|Y
01|227653|1|2|100+ pieces >> 45%|Y
01|227679|5|1|**Please note: This is special non-standard stock.|Y
01|227679|5|2|It cannot be cancelle or returned upon receipt of a PO.|Y
01|227684|1|1|Special discount reflects replacement order for A/H|Y
01|227684|1|2|on RGA: CUR-61575.|Y
01|227686|6|1|A tariff surcharge may be added to this quotation in|Y
01|227686|6|2|the event of a sustained tariff increase on the|Y
01|227686|6|3|importation of this product.  Any surcharge will be|Y
01|227686|6|4|disclosed prior to acceptance of an order.|Y
01|227691|1|1|HSK100A-C32-165G|Y
01|227695|1|1|We can index the table with an M-code and clamp and|Y
01|227695|1|2|unclamp the brakes via M-code.|Y
01|227695|1|3|Machine must have M-codes available|Y
01|227695|1|4|The customer would have to program two separate control|Y
01|227695|1|5|One for each axis.|Y
01|227695|1|6|Installation not included|Y
01|227695|1|7|Work holding not included|Y
01|227707|3|1|Quoted At NET Price.|Y
01|227708|3|1|Additional 20% added to your standard 22% discount.|Y
01|227708|3|2|Final sale|Y
01|227711|1|1|Additional 20% overstock promo discount applied. This|Y
01|227711|1|2|item cannot be canceleld or returned.|Y
01|227724|1|1|Final Part# TBD **Quoted at NET price**|Y
01|227724|1|2|CAT50 24 Test Bar No Flange|Y
01|227724|1|3|.|Y
01|227724|1|4|Please note this is a custom item and considered|Y
01|227724|1|5|special. Once a PO is placed it cannot be cancelled|Y
01|227724|1|6|or returned.|Y
01|227724|1|7|.|Y
01|227724|1|8|DELIVERY:|Y
01|227724|1|9|10-11 Weeks for manufacturing + shipping after|Y
01|227724|1|10|approval drawing is signed by the customer.|Y
01|227729|2|1|Quoted at Net price|Y
01|227735|1|1|SPECIAL presetter spindle for E46B:Fuji-Seiko Kaben|Y
01|227735|1|2|28mm|Y
01|227735|3|1|SPECIAL presetter spindle for E46B: Fuji-Seiko Kaben|Y
01|227735|3|2|21mm|Y
01|227735|5|1|SPECIAL presetter spindle for E46B: HPEGSHANK-QCTP-1|Y
01|227744|1|1|TAR-61562|Y
01|227744|1|2|5AX-201|Y
01|227746|1|1|P/N: C4001-0750-11.77|Y
01|227746|1|2|CAT40 Taper 3/4 shell mill holder w/ 11.77 gauge|Y
01|227746|1|3|New smaller body diameter at 1.46 per drawing provided|Y
01|227747|1|1|Special -ETA aprox 6-8 weeks delivery|Y
01|227747|2|1|A tariff surcharge may be added to this quotation in|Y
01|227747|2|2|the event of a sustained tariff increase on the|Y
01|227747|2|3|importation of this product.  Any surcharge will be|Y
01|227747|2|4|disclosed prior to acceptance of an order.|Y
01|227748|1|1|Not Req'd Ins.|Y
01|227748|2|1|Not Req'd Ins.|Y
01|227748|3|1|Not Req'd Ins.|Y
01|227748|4|1|Not Req'd Ins.|Y
01|227750|1|1|This item is discontinued stock. It cannot be cancelled|Y
01|227750|1|2|or returned upon receipt of a PO.|Y
01|227750|2|1|Delivery: 1 week after the receipt of spindle|Y
01|227750|2|2|measurements|Y
01|227751|1|1|INCLUDES AY0111 KOSMEK 130CC AIR/HYDRAULIC BOOSTER|Y
01|227751|1|2|INSTALLED INSIDE MOTOR COVER FOR BRAKE|Y
01|227751|3|1|adapter is in stock Scroll chuck is due 3/6/25|Y
01|227752|36|1|P/n: NCAT40-SK6C-90U-J-IDU|Y
01|227752|38|1|P/n: NCAT40-SK16C-150U-J-IDU|Y
01|227752|41|1|*Discontinued alternative for TQW-SK06 only 1pc in stk|Y
01|227752|41|2|**Item is non-cancellable and non-returnable.|Y
01|227761|4|1|A tariff surcharge may be added to this quotation in|Y
01|227761|4|2|the event of a sustained tariff increase on the|Y
01|227761|4|3|importation of this product.  Any surcharge will be|Y
01|227761|4|4|disclosed prior to acceptance of an order.|Y
01|227762|1|1|SAME FEATURE AS TCE-99008-2000R 3 METER LENGTH|Y
01|227762|2|1|SAME FEATURE AS TCE-99010-2000T 3 METER LENGTH|Y
01|227778|2|1|Master Jaw set for HW-10C-HS-A6 3mm|Y
01|227783|1|1|RGA#LVR-61561/|Y
01|227783|1|2|Repair of MZMP-ER40X-OFF-C s/n: 59664 02|Y
01|227783|1|3|(Mimatic#131556)|Y
01|227783|2|1|Bearings seals o-rings and damaged input spindle to|Y
01|227783|2|2|be replaced.|Y
01|227800|1|1|LN to make custom positioning block upon receipt of|Y
01|227800|1|2|Spindle Drawing Information.|Y
01|227801|7|1|ALL ITEMS ABOVE HAVE AN EXTRA 20% DISCOUNT FROM|Y
01|227801|7|2|OVERSTOCK PROMOTION. IF PURCHASED THEY ARE NOT|Y
01|227801|7|3|RETURNABLE.|Y
01|227803|20|1|A tariff surcharge may be added to this quotation in|Y
01|227803|20|2|the event of a sustained tariff increase on the|Y
01|227803|20|3|importation of this product.  Any surcharge will be|Y
01|227803|20|4|disclosed prior to acceptance of an order.|Y
01|227805|1|1|Quoted at Net Price|Y
01|227807|1|1|BT30-FMH27-45-60|Y
01|227811|6|1|**Special-Cannot be cancelled or returned**|Y
01|227811|8|1|**Special-Cannot be cancelled or returned**|Y
01|227811|9|1|Delivery: 1 week after receipt of spindle measurements.|Y
01|227811|9|2|**This item cannot be cancelled or returned**|Y
01|227817|1|1|Package deal with 10 holders 6 or shorter GL.|Y
01|227817|1|2|Promo PART# HSK63A FI-6-380 PACKAGE|Y
01|227817|2|1|SHRINK FIT PACKAGE PROMOTION INCLUDES 10 TOOLS|Y
01|227817|2|2|EXAMPLE BELOW|Y
01|227817|2|3|WAIVE GAUGE LENGTH RESTRICTION|Y
01|227825|1|1|TAR-61530|Y
01|227825|1|2|5AX-2MT-225-304.8OSP3M|Y
01|227825|1|3|SN: 2182|Y
01|227825|40|1|R-Axis Motor Cover Welding|Y
01|227825|41|1|Spindle Reconditioning|Y
01|227832|1|1|Part Number: TBD|Y
01|227832|1|2|Okuma BMT60 Live SK20Z<Axial>90D MainSub1+1|Y
01|227832|1|3|IntExtCool7MP 6.5K for LB3000EX2|Y
01|227832|3|1|Part Number: TBD|Y
01|227832|3|2|Mori BMT60 Live SK20 Z<Axial>90D MainSub IntExtCool7MP|Y
01|227832|3|3|6.5K for Mori NLX 2500|700|Y
01|227832|4|1|Part Number: TBD|Y
01|227832|4|2|Mori BMT60 Live SK20X<Radial>STRT IntExtCool7MP 6.5K|Y
01|227832|4|3|for Mori NLX 2500|700|Y
01|227832|5|1|Part Number: TBD|Y
01|227832|5|2|Mazak VDI40 Live SK20 Z<Axial>90D MainSub1+1 IntExtCool|Y
01|227832|5|3|7MP 6.5K for Mazak HQR-200MSY|Y
01|227832|6|1|Part Number: TBD|Y
01|227832|6|2|Mazak VDI40 Live SK20 X<Radial>STRT IntExtCool7MP 6.5K|Y
01|227832|6|3|for Mazak HQR-200MSY|Y
01|227832|7|1|A tariff surcharge may be added to this quotation in|Y
01|227832|7|2|the event of a sustained tariff increase on the|Y
01|227832|7|3|importation of this product.  Any surcharge will be|Y
01|227832|7|4|disclosed prior to acceptance of an order.|Y
01|227833|2|1|Quoted at NET price.|Y
01|227833|2|2|This item is non returnable.|Y
01|227838|4|1|*DCNA Alternative non-cancellable and non-returnable.|Y
01|227847|1|1|Crossover for PSC50-DSRNL27060-15 C5 TURNING HOLDER...|Y
01|227847|1|2|https://canelacorp-store.com/en/psc/4988|Y
01|227847|1|3|-psc50-dsrnl27060-15.html|Y
01|227847|1|4|10-19pc: $282.00 ea/net|Y
01|227847|1|6|*shim thickness - 6.35mm (1/4)|Y
01|227855|11|1|A tariff surcharge may be added to this quotation in|Y
01|227855|11|2|the event of a sustained tariff increase on the|Y
01|227855|11|3|importation of this product.  Any surcharge will be|Y
01|227855|11|4|disclosed prior to acceptance of an order.|Y
01|227860|1|1|Special Pricing based off of a 7 table project|Y
01|227860|1|2|Includes Nikken 5AX201YA-MPower and feedback cables|Y
01|227860|1|3|from Nikken to Machine Bulkhead. Enduser will need the|Y
01|227860|1|4|4th and 5th axis interface and 3rd party software|Y
01|227860|1|5|option from Haas.|Y
01|227860|2|1|Factory Installation|Y
01|227864|2|1|Replace JIS-W1517-AN6230-#4|Y
01|227864|17|1|Replace WP-13|Y
01|227877|11|1|SE1-2.2X2.0|Y
01|227877|11|2|Minimun quantity order of 5 pcs.|Y
01|227877|12|1|SES1-2.2X2.0|Y
01|227877|12|2|Minimun quantity order 5 pcs|Y
01|227877|13|1|A tariff surcharge may be added to this quotation in|Y
01|227877|13|2|the event of a sustained tariff increase on the|Y
01|227877|13|3|importation of this product.  Any surcharge will be|Y
01|227877|13|4|disclosed prior to acceptance of an order.|Y
01|227878|15|1|A tariff surcharge may be added to this quotation in|Y
01|227878|15|2|the event of a sustained tariff increase on the|Y
01|227878|15|3|importation of this product.  Any surcharge will be|Y
01|227878|15|4|disclosed prior to acceptance of an order.|Y
01|227884|1|1|BT40-FMB40-60|Y
01|227884|3|1|A tariff surcharge may be added to this quotation in|Y
01|227884|3|2|the event of a sustained tariff increase on the|Y
01|227884|3|3|importation of this product.  Any surcharge will be|Y
01|227884|3|4|disclosed prior to acceptance of an order.|Y
01|227889|1|1|T/P Inspection Required|Y
01|227889|2|1|T/P Inspection Required|Y
01|227898|1|1|Final Part# BT40-SK10C-180P **quoted at NET price**|Y
01|227898|1|2|BT40 Slim Chuck SK10 Coolant HiSpeed 30K|Y
01|227898|1|3|PLEASE NOTE: This is special non-standard stock. This|Y
01|227898|1|4|item cannot be cancelled or returned upon receipt of a|Y
01|227898|1|5|PO.|Y
01|227898|2|1|Final Part# BT40-SK10C-180P-J **quoted at NET price*|Y
01|227898|2|2|BT40 Slim Chuck SK10 JetSlotNut Coolant HiSpeed 30K|Y
01|227898|2|3|PLEASE NOTE: This is special non-standard stock. This|Y
01|227898|2|4|item cannot be cancelled or returned upon receipt of a|Y
01|227898|2|5|PO.|Y
01|227899|1|1|Includes Servo Motor for the Nikken Table|Y
01|227899|4|1|Includes Power and Feed Back Cable set from the|Y
01|227899|4|2|Nikken Table to the Machine Bulkhead. Includes Fanuc|Y
01|227899|4|3|Drive for the Nikken Table|Y
01|227905|1|1|T/P Inspection Required|Y
01|227905|2|1|T/P Inspection Required|Y
01|227911|1|1|RGA#TOR-61594/|Y
01|227911|1|2|Repair of PF-2|Y
01|227911|3|1|Calibration service included.|Y
01|227913|2|1|Please note additional 20% applied per overstock promo.|Y
01|227913|2|2|These items cannot be cancelled or returned upon|Y
01|227913|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|227913|2|4|need to be requoted.|Y
01|227916|7|1|Special discount reflects replacement order for A/H|Y
01|227916|7|2|on RGA: CUR-61575.|Y
01|227917|1|1|Service call for E346 s/n:100504|Y
01|227917|1|2|This is a time based estimate.|Y
01|227917|1|3|Any parts that would be required would be additional.|Y
01|227919|2|1|P/N: CAT50-AF1-30-OH|Y
01|227919|2|2|Main Body for Hole Diameter 1.05in.|Y
01|227919|2|3|Must quote with 3 accessories below.|Y
01|227919|3|1|P/N: BF130-26.67-50.8-31.75C|Y
01|227919|3|2|Arbor for above|Y
01|227919|4|1|P/N: 9BF130-26.67-50.8-31.775C-I|Y
01|227919|4|2|Byte for above MOQ = 3 pieces|Y
01|227919|5|1|P/N: AFC-15|Y
01|227919|5|2|Insert for above (10p/set)|Y
01|227919|10|1|P/N: CAT50-SF1-30-OH|Y
01|227919|10|2|Main Body for Hole Diameter: 0.80in|Y
01|227919|10|3|Must quote with 3 accessories below|Y
01|227919|11|1|P/N: BF130-20.32-38.1-38.1C|Y
01|227919|11|2|Arbor for above|Y
01|227919|12|1|P/N: 9BF130-20.32-38.1-38.1C-I|Y
01|227919|12|2|Byte for above MOQ = 3pcs|Y
01|227919|13|1|P/N: AFC-15|Y
01|227919|13|2|Insert for above (10pc/set)|Y
01|227919|18|1|P/N: CAT50-AF1-40OH|Y
01|227919|18|2|Main Body for Hole Diameter 1.30in.|Y
01|227919|18|3|Must quote with below 3 accessories|Y
01|227919|19|1|P/N: BF140-33.02-60.325-61C|Y
01|227919|19|2|Arbor for above|Y
01|227919|20|1|P/N: 9BF140-33.02-60.325-61C-I|Y
01|227919|20|2|Byte for above MOQ = 3pcs|Y
01|227919|21|1|P/N: AFC-20|Y
01|227919|21|2|Insert for above (10pc/set)|Y
01|227924|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|227924|2|1|Req.INS/Install S1/4-28X1/4|Y
01|227924|3|1|Req.INS/Install S3/8-24X5/16|Y
01|227924|4|1|Req.INS/Install S7/16-20X3/8|Y
01|227924|5|1|Req.INS/Install S9/16-18X1/2|Y
01|227924|6|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|227924|7|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|227924|8|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|227924|9|1|Req.INS/Install E32-NUT|Y
01|227924|10|1|Req.INS/Install S3/4-16X11/16|Y
01|227927|1|1|CNC401BOSP4-M with Okuma motor|Y
01|227930|5|1|Replace WP-13|Y
01|227930|13|1|Doesn't include 249090a on TCZ-E6004 drawing|Y
01|227933|1|1|No Inspection Required|Y
01|227933|2|1|No Inspection Required|Y
01|227933|3|1|No Inspection Required|Y
01|227933|4|1|No Inspection Required|Y
01|227933|5|1|No Inspection Required|Y
01|227933|6|1|No Inspection Required|Y
01|227933|7|1|No Inspection Required|Y
01|227945|3|1|**Special non-standard stock. Cannot be cancelled or|Y
01|227945|3|2|returned upon receipt of PO**|Y
01|227945|13|1|**SPECIAL - Cannot be cancelled or returned upon|Y
01|227945|13|2|receipt of a PO.**|Y
01|227945|13|3|**Quoted at NET Price**|Y
01|227945|13|4|DELIVERY - Lead time 8-10 weeks after an approval|Y
01|227945|13|5|drawing is signed by the customer.|Y
01|227947|1|1|CAT50U-NX5-151 X 4~5 pcs $3347.00 list less 26%|Y
01|227947|3|1|Quoted at NET price.|Y
01|227952|1|1|Inspection fee is charged for RGA#TOR-61510|Y
01|227952|1|2|SF-START2-UNIT-200 s/n: 2J7183|Y
01|227952|2|1|RGA#TOR-61510/|Y
01|227952|2|2|Returning customer's SF-START2-UNIT-200 s/n: 2J7183|Y
01|227965|2|1|Please note additional 20% applied per overstock promo.|Y
01|227965|2|2|These items cannot be cancelled or returned upon|Y
01|227965|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|227965|2|4|need to be requoted.|Y
01|227971|8|1|HSK63A-HC12-90|Y
01|227971|8|2|HSK63A Hydraulic Chuck 12mm GL:90mm|Y
01|227976|1|1|Mimatic 90degree Angle Head Type SW Size 7ANSI-CAT40|Y
01|227976|1|2|*Lead time given as ADA-After Signed Drawing Approval.|Y
01|227976|1|3|Please allow 1-2 weeks for creation of approval drawing|Y
01|227976|1|4|Shaft: ANSI-CAT40 (Pull stud thread UNC 5/8-11)|Y
01|227976|1|5|Support: Machine-specific 3-pin support.|Y
01|227976|1|6|Includes Torque-Arm and locking mechanism|Y
01|227976|1|7|No stop block. Customer-side adjustment required.|Y
01|227976|1|8|Dimensions: A=65mm D=20mm SW=18mm|Y
01|227976|1|9|Length: L=180mm L1=80mm 360 Degree Adjustable.|Y
01|227976|1|10|Max Speed: N1(max)=6500rpm/N2(max)=6500rpm.|Y
01|227976|5|1|MI-50 Adapter 1 Diameter Pilot Arbor w/ 1/4 Key|Y
01|227976|5|2|*Lead time given as ADA - After Signed Drawing Approval|Y
01|227976|5|3|Please allow 1-2 weeks for creation of approval drawing|Y
01|227976|8|1|LN to produce Positioning Block upon receipt of spindle|Y
01|227976|8|2|drawing information. *Given as NET price|Y
01|227978|2|1|BLOCK for Metform 5AX-2MT|Y
01|227978|2|2|5AX-2MTSN 8244SN 8212 See pic in H Drive|N
01|227979|7|1|Added 5% discount since the unit is a DEMO.|Y
01|227988|1|1|1st Batch  9/18 approved by BEn|Y
01|227988|2|1|T/P Inspection Required|Y
01|227988|20|1|1st Batch/Stock|Y
01|227995|1|1|Everything in stock except 500-008 & 500-021 (2 WEEKS)|Y
01|227995|1|2|Please note 40% only applies to these 5C qty. breaks.|Y
01|228011|4|1|Please Note: This item is quoted at NET price.|Y
01|228019|2|1|Optional scroll chuck and adapter plate|Y
01|228019|3|1|Required|Y
01|228020|2|1|End user is responsible for getting the Third Party|Y
01|228020|2|2|Software Option enabled from Haas.|Y
01|228021|1|1|RGA#LVR-61577/|Y
01|228021|1|2|Repair of MNL12-ER32Z s/n:A4046 (Alps#T32207)|Y
01|228021|2|1|Bearings o-rings and collet nut to be replaced.|Y
01|228022|1|1|RGA#LVR-61592/|Y
01|228022|1|2|Repair of MNL12-ER32Z s/n:A4047 (Alps#T32207)|Y
01|228022|2|1|Bearings o-rings collet nut and gears to be replaced|Y
01|228026|2|1|Delivery: ~1 week after the receipt of spindle|Y
01|228026|2|2|measurements for design|Y
01|228031|5|1|Calibration|Y
01|228031|7|1|A tariff surcharge may be added to this quotation in|Y
01|228031|7|2|the event of a sustained tariff increase on the|Y
01|228031|7|3|importation of this product.  Any surcharge will be|Y
01|228031|7|4|disclosed prior to acceptance of an order.|Y
01|228050|4|1|A tariff surcharge may be added to this quotation in|Y
01|228050|4|2|the event of a sustained tariff increase on the|Y
01|228050|4|3|importation of this product.  Any surcharge will be|Y
01|228050|4|4|disclosed prior to acceptance of an order.|Y
01|228052|2|1|Quoted at NET price.|Y
01|228053|1|1|Please note this is a non-cancellable non-returnable|Y
01|228053|1|2|item|Y
01|228053|2|1|A tariff surcharge may be added to this quotation in|Y
01|228053|2|2|the event of a sustained tariff increase on the|Y
01|228053|2|3|importation of this product.  Any surcharge will be|Y
01|228053|2|4|disclosed prior to acceptance of an order.|Y
01|228065|3|1|Replace 4x17|Y
01|228065|9|1|Replace WP-13|Y
01|228085|1|1|RGA#TAR-61537|Y
01|228085|1|2|AX-350FA-M|Y
01|228085|1|3|SN:3550|Y
01|228085|25|1|Replate Fee|Y
01|228087|7|1|A tariff surcharge may be added to this quotation in|Y
01|228087|7|2|the event of a sustained tariff increase on the|Y
01|228087|7|3|importation of this product.  Any surcharge will be|Y
01|228087|7|4|disclosed prior to acceptance of an order.|Y
01|228089|1|1|Includes 6port rotary unions.|Y
01|228108|1|1|K32-SK20-250>> 32mm Straight Shank Extension Slim Chuck|Y
01|228108|1|2|SK20|Y
01|228114|1|1|16-ZMAC32R-55V|Y
01|228114|2|1|A tariff surcharge may be added to this quotation in|Y
01|228114|2|2|the event of a sustained tariff increase on the|Y
01|228114|2|3|importation of this product.  Any surcharge will be|Y
01|228114|2|4|disclosed prior to acceptance of an order.|Y
01|228117|1|1|BT40-HC6-90|Y
01|228121|1|1|INCLUDES AY0111 KOSMEK 130CC AIR/HYDRAULIC BOOSTER|Y
01|228121|1|2|INSTALLED INSIDE MOTOR COVER FOR BRAKE|Y
01|228131|1|1|Special quantity break pricing applied.|Y
01|228131|1|2|Please note pricing reflects 12 pieces.|Y
01|228140|3|1|A tariff surcharge may be added to this quotation in|Y
01|228140|3|2|the event of a sustained tariff increase on the|Y
01|228140|3|3|importation of this product.  Any surcharge will be|Y
01|228140|3|4|disclosed prior to acceptance of an order.|Y
01|228141|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|228147|1|1|Final Part# BT50-SK6-105P|Y
01|228147|1|2|BT50 Slim Chuck SK6 HiSpeed 20K|Y
01|228147|1|3|**This is special non-standard stock. Cannot be|Y
01|228147|1|4|cancelled or returned upon receipt of a PO.|Y
01|228147|8|1|**Special non-standard stock. Non-cancellable non-|Y
01|228147|8|2|returnable**|Y
01|228147|18|1|DELIVERY: 10pcs 1-2 Weeks Balance 3-5 weeks|Y
01|228147|25|1|Final Part# BT50-C20-105G **Quoted at NET Price**|Y
01|228147|25|2|BT50 Milling Chuck 20mm HiSpeed 20K|Y
01|228147|25|3|**Special non-standard stock. Non-cancellable non-|Y
01|228147|25|4|returnable after receipt of PO**|Y
01|228147|25|5|.|N
01|228147|36|1|**non-cancellable non-returnable**|Y
01|228147|37|1|**non-cancellable non-returnable**|Y
01|228147|38|1|**non-cancellable non-returnable**|Y
01|228147|39|1|**non-cancellable non-returnable**|Y
01|228147|40|1|**non-cancellable non-returnable**|Y
01|228147|41|1|**non-cancellable non-returnable**|Y
01|228147|42|1|**non-cancellable non-returnable**|Y
01|228147|45|1|Final Part# BT50-C1.1/4-105G|Y
01|228147|45|2|BT50 Milling Chuck 1.1/4 HiSpeed 15K|Y
01|228147|45|3|**Non-cancellable non-returnable**|Y
01|228147|45|4|.|Y
01|228147|45|5|DELIVERY: 5pcs 1 wk 6pcs 2-3 Wks Balance 12 Wks|Y
01|228154|1|1|Service call for E46LA s/n: 200178|Y
01|228154|1|2|This is a time based estimate.|Y
01|228154|1|3|Any parts that would be required would be additional.|Y
01|228155|6|1|A tariff surcharge may be added to this quotation in|Y
01|228155|6|2|the event of a sustained tariff increase on the|Y
01|228155|6|3|importation of this product.  Any surcharge will be|Y
01|228155|6|4|disclosed prior to acceptance of an order.|Y
01|228157|3|1|TAT/SUPPRT TABLE FOR TRUNNION ASSEMBLY|Y
01|228157|4|1|ROTARY JOINT FOR THRU CENTER HYDRAULICS/PNUEMATICS|Y
01|228157|5|1|WILL BE 15 WIDE BY 18 LONG|Y
01|228157|5|2|PART NUMBER WILL LIKELY BE:|Y
01|228157|5|3|-TRUNNION-STALLION-15/18|Y
01|228157|6|1|CUSTOM BASEPLATE FOR ROTARY/TAT/TRUNNION.|Y
01|228157|6|2|WILL BE KEYED TO MATCH THE TABLE.|Y
01|228157|6|3|PLATE WILL BE 1.25 THICK|Y
01|228157|6|4|DNM7500L-50|Y
01|228158|1|1|RGA#LVR-61591/|Y
01|228158|1|2|Repair of BMT65-ER32X-ICE s/n: 20904745 01|Y
01|228158|1|3|(Mimatic#186490)|Y
01|228158|2|1|Bearings seals and o-rings to be replaced.|Y
01|228159|2|1|A tariff surcharge may be added to this quotation in|Y
01|228159|2|2|the event of a sustained tariff increase on the|Y
01|228159|2|3|importation of this product.  Any surcharge will be|Y
01|228159|2|4|disclosed prior to acceptance of an order.|Y
01|228163|2|1|SINGLE PIECE POSITIONING BLOCK|Y
01|228163|3|1|2 PIECE POSITIONING BLOCK|Y
01|228164|3|1|need to choose taper pots unit comes with one set|Y
01|228165|7|1|A tariff surcharge may be added to this quotation in|Y
01|228165|7|2|the event of a sustained tariff increase on the|Y
01|228165|7|3|importation of this product.  Any surcharge will be|Y
01|228165|7|4|disclosed prior to acceptance of an order.|Y
01|228174|1|1|Quantity Breaks: (*NET Pricing)|Y
01|228174|1|2|51+ pcs: $28.60/EA|Y
01|228174|1|3|200+ pcs: $27.56/EA|Y
01|228174|1|4|300+ pcs: $26.00/EA|Y
01|228180|1|1|Please note: This is special non-standard stock. It|Y
01|228180|1|2|cannot be cancelled or returned upon receipt of a PO.|Y
01|228181|2|1|KM25-6.5|Y
01|228181|4|1|KM25-7.5|Y
01|228181|6|1|KM25-8.5|Y
01|228181|8|1|KM25-9.5|Y
01|228181|10|1|KM25-10.5|Y
01|228181|12|1|KM25-11.5|Y
01|228181|14|1|KM25-12.5|Y
01|228181|16|1|KM25-13.5|Y
01|228181|18|1|KM25-14.5|Y
01|228181|20|1|KM25-15.5|Y
01|228181|22|1|KM25-16.5|Y
01|228181|24|1|KM25-17.5|Y
01|228181|26|1|KM25-18.5|Y
01|228181|28|1|KM25-19.5|Y
01|228181|30|1|KM25-20.5|Y
01|228181|32|1|KM25-21.5|Y
01|228181|34|1|KM25-22.5|Y
01|228181|35|1|KM25-23|Y
01|228188|1|1|Base Plate for 5AX201-YA-M to Zero Clamp Pneumatic|Y
01|228188|2|1|Pneumatic Self Centering Vise|Y
01|228197|1|1|Please note:|Y
01|228197|1|2|- Requires Spindle Speeder Questionnaire and|Y
01|228197|1|3|Customer Agreement Form to be completed pior to a PO|Y
01|228197|2|1|LN to make positioning block. Delivery ~1 Week after|Y
01|228197|2|2|the receipt of spindle measurements.|Y
01|228197|2|3|**Cannot be cancelled or returned**|Y
01|228203|18|1|Discount bumped 10%|Y
01|228209|1|1|QUOTED AT NET pricing|Y
01|228236|1|1|Discount reflects a purchase order of 1~3 holders.|Y
01|228236|2|1|Discount reflects a purchase order of 4~6 holders.|Y
01|228242|4|1|A tariff surcharge may be added to this quotation in|Y
01|228242|4|2|the event of a sustained tariff increase on the|Y
01|228242|4|3|importation of this product.  Any surcharge will be|Y
01|228242|4|4|disclosed prior to acceptance of an order.|Y
01|228244|1|1|1st Batch/(1)997147 1/13KC:DWG Saved in Teams File|Y
01|228260|12|1|Coolant option for 1/8 collet|Y
01|228278|1|1|AC003007 RFID BIS-C-122-04/L installed and holder|Y
01|228278|1|2|re-balanced. Holder and packaging etched with AC003007|Y
01|228278|1|3|Quoted at NET price.|Y
01|228279|1|1|Additional 20% Overstock Promo discount applied. This|Y
01|228279|1|2|item cannot be cancelled or returned.|Y
01|228288|1|1|5AX-DD350F SN: 1009|Y
01|228288|1|2|OKK MACHINE VC-X350 SN: 266|Y
01|228288|1|3|CUSTOMER HAS OVERLOAD ALARM CANNOT ROTATE TILTING AXIS|Y
01|228288|1|4|RGA#TAR-61691|Y
01|228299|6|1|Installation includes: Dual axis drive unit short bar|Y
01|228299|6|2|fiber optic cable communications cable bulkhead cable|Y
01|228299|6|3|external cables parameter changes service time and|Y
01|228299|6|4|travel.|Y
01|228312|3|1|*Considered a special and is non-cancellable and|Y
01|228312|3|2|non-returnable once a PO has been placed.|Y
01|228327|1|1|CNCZ321MA (SN: 15178) Storage Cost|Y
01|228327|1|4|Experation Date: End of March 2025|Y
01|228332|10|1|5/32|Y
01|228332|12|1|7/32|Y
01|228332|14|1|9/32|Y
01|228332|16|1|11/32|Y
01|228332|19|1|5/32|Y
01|228332|21|1|7/32|Y
01|228332|23|1|9/32|Y
01|228332|25|1|11/32|Y
01|228332|27|1|13/32|Y
01|228332|29|1|15/32|Y
01|228332|31|1|17/32|Y
01|228332|33|1|19/32|Y
01|228332|42|1|A tariff surcharge may be added to this quotation in|Y
01|228332|42|2|the event of a sustained tariff increase on the|Y
01|228332|42|3|importation of this product.  Any surcharge will be|Y
01|228332|42|4|disclosed prior to acceptance of an order.|Y
01|228336|4|1|Machine must have additional axis software option|Y
01|228336|4|2|Machine must have ladder for additional axis|Y
01|228336|4|3|Includes: Drive unit short bar fiber optic cable|Y
01|228336|4|4|communications cable bulkhead cables external cables|Y
01|228336|4|5|modification to the door cable management service|Y
01|228336|4|6|time and travel.|Y
01|228338|1|1|Part Number: HSK63A-ER25-57|Y
01|228338|1|2|HSK63A ER25 Collet Chuck Extra Short Gage Length|Y
01|228338|1|3|Quantity Breaks:|Y
01|228338|1|4|2+ Pcs: $723/EA|Y
01|228338|1|5|5+ Pcs: $510/EA|Y
01|228338|1|6|10+ Pcs: $366.70/EA|Y
01|228338|1|7|*Lead time given as ADA - After Signed Drawing Approval|Y
01|228338|1|8|Please allow 1-2 weeks for creation of Approval Drawing|Y
01|228354|1|1|Not available with coolant ports in this size|Y
01|228367|2|1|ETA is approximately 16~18 weeks after receipt of an|Y
01|228367|2|2|order.|Y
01|228367|3|1|Currently 2 in stock.  ETA for balance of 4 is|Y
01|228367|3|2|approximately 16~18 weeks after receipt of an order.|Y
01|228367|15|1|Currently 3 in stock. Additional 5 will be available|Y
01|228367|15|2|early April 2025 balance would be 2~3 weeks after|Y
01|228367|15|3|receipt of an order.|Y
01|228367|18|1|Currently 5 in stock.  The balance of 7 ETA is 2~3|Y
01|228367|18|2|weeks after receipt of an order.|Y
01|228367|28|1|4 pieces available 2~3 weeks after receipt of an order.|Y
01|228367|28|2|ETA of balance of 8 is approximately 16~18 weeks.|Y
01|228368|3|1|This is a NET charge for Lyndex Nikken to assist in the|Y
01|228368|3|2|design and manufacturing of the positioning block that|Y
01|228368|3|3|will be needed for the customer's VF4.  Customer is|Y
01|228368|3|4|responsible for supplying Lyndex the needed spindle|Y
01|228368|3|5|drawing and/or any needed dimensions.|Y
01|228369|1|1|Installed with PS-N46E|Y
01|228369|2|1|Installed with PS-N46E|Y
01|228369|3|1|NC5-46-SK16C-90P w/PS-N46E|Y
01|228369|3|2|Replaces NC5-46-GSK16C-90P. Install with PS-N46E|Y
01|228369|4|1|Installed with PS-N46E|Y
01|228369|10|1|Installed with PS-N46E|Y
01|228369|11|1|Installed with PS-N46E|Y
01|228369|13|1|Installed with PS-N46E|Y
01|228371|3|1|Base Plate for Tailstock / Tailbody|Y
01|228371|5|1|Includes 4th axis interfaceinstall and travel|Y
01|228372|7|1|Contains the items below from line #8-24|Y
01|228372|7|2|DO NOT ADD TO YOUR PO!|Y
01|228372|7|3|20% off list overstock discount; $4519 list|Y
01|228374|1|1|ER8 1/2 Straight Shank Extension with 8.5 OAL MiniNut|Y
01|228378|2|1|Please note: this item is special non-standard stock.|Y
01|228378|2|2|It cannot be cancelled or returned.|Y
01|228381|1|1|To be installed with BT30-TB40-150|Y
01|228381|2|1|Please allow for 2 months manufacturing plus delivery.|Y
01|228381|2|2|These are non-standard stock items & considered|Y
01|228381|2|3|specials. Once PO has been issued these cannot be|Y
01|228381|2|4|cancelled or returned.|Y
01|228386|5|1|Only have 2.25 Gage Length for the 3/4 EMH|Y
01|228386|6|1|Only have 2.69 Gage Length for the 1 EMH|Y
01|228386|7|1|Only have 3.62 Gage Length for the 1.1/4 EMH|Y
01|228391|1|1|Tooling is quoted at NET price for 1 holder.|Y
01|228391|30|1|This holder is an alternative to the Special|Y
01|228391|30|2|quoted above.|Y
01|228393|1|1|No Inspection Required.|Y
01|228394|1|1|P/N: MNZ20-SK16X|Y
01|228394|1|2|Mori BMT40 Live SK16 X<Radial>STRT External Coolant|Y
01|228394|1|3|CH83|Y
01|228394|5|1|P/N: MNZ20-SK16Z|Y
01|228394|5|2|Mori BMT40 Live SK16 Z<Axial>90D External Coolant|Y
01|228394|5|3|CH85|Y
01|228400|1|1|10% special core buy back for the old table.|Y
01|228413|1|1|BT50-SCA31.75-90|Y
01|228420|1|1|Net price for OSG|Y
01|228420|2|1|Place Holder Only Machine Make and model required|Y
01|228420|2|2|Price subject to change|Y
01|228420|19|1|A tariff surcharge may be added to this quotation in|Y
01|228420|19|2|the event of a sustained tariff increase on the|Y
01|228420|19|3|importation of this product.  Any surcharge will be|Y
01|228420|19|4|disclosed prior to acceptance of an order.|Y
01|228423|1|1|Final Part# BT50-SK6-105P|Y
01|228423|1|2|BT50 Slim Chuck SK6 HiSpeed 20K|Y
01|228423|1|3|**This is special non-standard stock. Cannot be|Y
01|228423|1|4|cancelled or returned upon receipt of a PO.|Y
01|228423|18|1|DELIVERY: 10pcs 1-2 Weeks Balance 3-5 weeks|Y
01|228423|31|1|A tariff surcharge may be added to this quotation in|Y
01|228423|31|2|the event of a sustained tariff increase on the|Y
01|228423|31|3|importation of this product.  Any surcharge will be|Y
01|228423|31|4|disclosed prior to acceptance of an order.|Y
01|228434|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|228441|2|1|one of these is for the 3.070 dia. and the other is for|Y
01|228441|2|2|the 2.556 dia.|Y
01|228441|3|1|This one is for the 2.362 diameter|Y
01|228441|4|1|This one is for the 1.368 diameter|Y
01|228441|5|1|This one is for the 2.048 diameter.|Y
01|228442|14|1|A tariff surcharge may be added to this quotation in|Y
01|228442|14|2|the event of a sustained tariff increase on the|Y
01|228442|14|3|importation of this product.  Any surcharge will be|Y
01|228442|14|4|disclosed prior to acceptance of an order.|Y
01|228449|8|1|Oil Chiller with hoses AKZ149-T|Y
01|228450|1|1|OVERSTOCK DISCOUNT 20%|Y
01|228450|1|2|PACKAGE CONTENTS BELOW|Y
01|228460|1|1|This set is for a R450XD1|Y
01|228462|1|1|Tooling Certificate face value $26817.00|Y
01|228483|1|1|Part Number: BT50-FMH22-47-150|Y
01|228483|1|2|BT50 Shell Mill Holder 22mm CoolantPorts|Y
01|228486|1|1|match with SN#41641TC|Y
01|228486|1|2|includes the following accessories|Y
01|228486|1|3|TCE-A7026/9A cable|Y
01|228486|1|4|TCE-A94808/5 cable|Y
01|228486|1|5|TCD-A3515-R. 3+1PRJ|Y
01|228487|1|1|same as previous R.Table serial#1808.|Y
01|228487|1|3|6+1 RJ included|Y
01|228487|1|4|quoted as Net price|Y
01|228487|1|5|6 months for manufacturing upon approval drawing|Y
01|228487|1|6|After manufacturing it will be moved by Boat.|Y
01|228487|1|7|Inland freight (USA) is not included.|Y
01|228487|7|1|A tariff surcharge of 8% will be added to every order|Y
01|228487|7|2|placed after September 1st 2025(until further notice).|Y
01|228487|7|3|This surcharge will be acknowledged upon acceptance|Y
01|228487|7|4|of every order.|Y
01|228488|1|1|External Yellow Cable set 1m long for CNC180LFA SN10693|Y
01|228488|1|2|Doosan VC400|Y
01|228489|4|1|(2) Free Rolls with Package|Y
01|228489|5|1|Local travel setup and training.|Y
01|228489|5|2|CHARGE WAIVED IF ORDER RECEIVED BY 2/26/25-DanaS|Y
01|228493|5|1|Promotion discount has been added.|Y
01|228494|3|1|H80F-SF0250-3.00B-IDI|Y
01|228494|3|2|HSK80F (with Makino Pins) 1/4Shrink Fit 3 gage length|Y
01|228494|3|3|Balanceable and Pre-balanced 30000RPM Pluggable|Y
01|228494|3|4|Coolant Ports Pan Head screws installed coolant tubes|Y
01|228494|3|5|and Balluff Chip BIS-C-122-04/L|Y
01|228494|4|1|A tariff surcharge may be added to this quotation in|Y
01|228494|4|2|the event of a sustained tariff increase on the|Y
01|228494|4|3|importation of this product.  Any surcharge will be|Y
01|228494|4|4|disclosed prior to acceptance of an order.|Y
01|228496|2|1|ALL CABLES NEEDED FOR INSTALLATION|Y
01|228496|2|2|CABLE AND HOSE LENGTHS TO BE DETERMINED|Y
01|228496|5|1|A tariff surcharge may be added to this quotation in|Y
01|228496|5|2|the event of a sustained tariff increase on the|Y
01|228496|5|3|importation of this product.  Any surcharge will be|Y
01|228496|5|4|disclosed prior to acceptance of an order.|Y
01|228502|2|1|For 4mm END Mill|Y
01|228502|2|2|Jet slot coolant around shank|Y
01|228503|3|1|Overstock Sale|Y
01|228503|3|2|List = $4519|Y
01|228503|3|3|See quote  #228450 for contents|Y
01|228513|1|1|5AX-N400FA-8+1PRJ SN: 3103|Y
01|228513|1|2|Table crash needs evaluation|Y
01|228513|1|3|Minimum 4 hour labor for x1 Tech|Y
01|228513|2|1|EXPEDITED SERVICE FEE AIRFARE ETC|Y
01|228515|1|1|HSK100A 1/8 Shrink Fit 3.74GL|Y
01|228515|2|1|HSK100A 1/8 SF 6.30GL|Y
01|228518|1|1|For Hathor Six A  s/n:6678|Y
01|228524|1|1|S/n: A0098|Y
01|228524|2|1|S/n: A0106|Y
01|228525|4|1|*Please see drawing attached in email - LN can make|Y
01|228525|4|2|custom Width Length and Thickness. Lead time of 1-3|Y
01|228525|4|3|days after receipt of order and confirmation of specs.|Y
01|228527|3|1|A tariff surcharge may be added to this quotation in|Y
01|228527|3|2|the event of a sustained tariff increase on the|Y
01|228527|3|3|importation of this product.  Any surcharge will be|Y
01|228527|3|4|disclosed prior to acceptance of an order.|Y
01|228529|2|1|HSK50A Test Bar L=300 mm|Y
01|228529|2|2|D=1.75 or D=1.5|Y
01|228530|5|1|8 HOURS PRESETTER SETUP AND TRAINING|Y
01|228530|5|2|INCLUDED AT NO COST TO ITS OR QUINCY COMPRESSORS|Y
01|228531|2|1|Additional 20% discount has been applied for our|Y
01|228531|2|2|Overstock Promotion.  Once a purchase order has been|Y
01|228531|2|3|received this item cannot be cancelled or returned.|Y
01|228547|1|1|Quoted at NET price for Fanuc Robo|Y
01|228550|1|1|TCE-46076/2|Y
01|228550|2|1|TCE-97382|Y
01|228551|1|1|Without motor: Motor to be supplied by EU|Y
01|228551|1|2|Includes cables|Y
01|228551|2|1|Without motor: Motor to be supplied by EU|Y
01|228551|2|2|Includes cables|Y
01|228551|3|1|Includes motor and cables.|Y
01|228559|2|1|AIRFARE HOTEL TRAVEL GAS MEALS ETC.|Y
01|228564|1|1|P/N: HSK125A-C1.1/4-115-IDI|Y
01|228564|1|2|HSK125A Taper 1.1/4 Milling Chuck with ID Chip Hole|Y
01|228564|1|3|install Balluff Chip Balluff Chip install and HSK63|Y
01|228564|1|4|Tube install and Re-Balance|Y
01|228564|1|5|Price quoted is NET price|Y
01|228577|1|1|RGA#TOR-61649/|Y
01|228577|1|2|Repair of PF-2|Y
01|228577|4|1|Calibration service included.|Y
01|228578|1|1|Quoted at NET price.|Y
01|228598|1|1|HSK100A-HC12-150|Y
01|228598|2|1|HSK100A-HC14-150|Y
01|228598|3|1|cat40-hc17.5-150|Y
01|228598|4|1|CAT40-HC12-150|Y
01|228598|7|1|CAT40-HC6-150|Y
01|228598|8|1|CAT40-HC10-150|Y
01|228599|1|1|P/N: NCAT40-SF16-65 with special 48mm OD as per|Y
01|228599|1|2|drawing.|Y
01|228607|1|1|Please note this is special non-standard stock. It|Y
01|228607|1|2|cannot be cancelled or returned upon receipt of PO.|Y
01|228607|3|1|Please note this is discontinued item. It cannot|Y
01|228607|3|2|be cancelled or returned after receipt of PO.|Y
01|228610|1|1|Please allow 5 months manufacturing time plus delivery.|Y
01|228610|1|2|These are non-standard stock items and considered|Y
01|228610|1|3|specials. Once a PO has been issued these cannot be|Y
01|228610|1|4|cancelled or returned.|Y
01|228611|1|1|Please note this is special non-standard stock.|Y
01|228611|1|2|Cannot be cancelled or returned after receipt of PO|Y
01|228615|2|1|A tariff surcharge of 8% will be added to every order|Y
01|228615|2|2|placed after September 1st 2025(until further notice).|Y
01|228615|2|3|This surcharge will be acknowledged upon acceptance|Y
01|228615|2|4|of every order.|Y
01|228617|1|1|5AX-800FA-RCN2-RJ6 SN:2002|Y
01|228617|1|2|Coolant contamination needs evaluation|Y
01|228617|2|1|AIRFARE HOTEL TRAVEL GAS MEALS ETC.|Y
01|228617|3|1|A tariff surcharge of 8% will be added to every order|Y
01|228617|3|2|placed after September 1st 2025(until further notice).|Y
01|228617|3|3|This surcharge will be acknowledged upon acceptance|Y
01|228617|3|4|of every order.|Y
01|228620|1|1|Table without motor.|Y
01|228620|2|1|Quoted at NET price.|Y
01|228620|2|2|Please note: Once a purchase order is placed it|Y
01|228620|2|3|cannot be cancelled or returned.|Y
01|228629|1|1|Net Price for Sacsa|Y
01|228629|1|2|Non Cancelable Non Returnable|Y
01|228632|4|1|H63A-SF20-120CP|Y
01|228647|1|1|Cheersun BOAT#02252501-B|Y
01|228647|1|2|2/26RY:No INS Req'd.|N
01|228647|2|1|Cheersun BOAT#02252501-B|Y
01|228647|2|2|2/26RY:No INS Req'd.|N
01|228647|3|1|Cheersun BOAT#02252501-B|Y
01|228647|3|2|2/26RY:No INS Req'd.|N
01|228647|4|1|Cheersun BOAT#02252501-B|Y
01|228647|4|2|2/26RY:No INS Req'd.|N
01|228647|5|1|Cheersun BOAT#02252501-B|Y
01|228647|5|2|2/26RY:No INS Req'd.|N
01|228647|6|1|Cheersun BOAT#02252501-B|Y
01|228647|6|2|2/26RY:No INS Req'd.|N
01|228660|1|1|OVERSTOCK PROMO 20% OFF|Y
01|228660|1|2|LIST = $678.00|Y
01|228663|3|1|Please Note: 2 Wrenches are required for above holders|Y
01|228664|2|1|A tariff surcharge may be added to this quotation in|Y
01|228664|2|2|the event of a sustained tariff increase on the|Y
01|228664|2|3|importation of this product.  Any surcharge will be|Y
01|228664|2|4|disclosed prior to acceptance of an order.|Y
01|228668|2|1|Includes Power and feedback cables from Nikken Table|Y
01|228668|2|2|to Okuma Bulkhead|Y
01|228668|6|1|Includes Power and Feedback cables from Nikken Table|Y
01|228668|6|2|to Okuma Bulkhead|Y
01|228682|1|1|Discontinued overstock item. Cannot be cancelled or|Y
01|228682|1|2|returned after receipt of PO.|Y
01|228685|3|1|A tariff surcharge may be added to this quotation in|Y
01|228685|3|2|the event of a sustained tariff increase on the|Y
01|228685|3|3|importation of this product.  Any surcharge will be|Y
01|228685|3|4|disclosed prior to acceptance of an order.|Y
01|228692|1|1|External Yellow Cable set 1m long for CNC180LFA SN10693|Y
01|228692|1|2|Doosan VC400|Y
01|228699|2|1|2 POTS INCLUDED IN PRICE OF THE UNIT|Y
01|228718|1|1|EXTERNAL POWER/FEEDBACK CABLES FROM NIKKEN TABLE TO|Y
01|228718|1|2|BULKHEAD INCLUDED AT NO COST TO MORRIS SOUTH|Y
01|228718|3|1|MOUNTING HARDWARE FOR M120S VISE|Y
01|228726|7|1|A tariff surcharge may be added to this quotation in|Y
01|228726|7|2|the event of a sustained tariff increase on the|Y
01|228726|7|3|importation of this product.  Any surcharge will be|Y
01|228726|7|4|disclosed prior to acceptance of an order.|Y
01|228731|3|1|A tariff surcharge may be added to this quotation in|Y
01|228731|3|2|the event of a sustained tariff increase on the|Y
01|228731|3|3|importation of this product.  Any surcharge will be|Y
01|228731|3|4|disclosed prior to acceptance of an order.|Y
01|228735|1|1|-3pc: $8226.23 ea/net|Y
01|228735|1|2|-Special net price with minimum order quantity of 3 pc.|Y
01|228735|1|3|-Delivery: please allow 4 weeks for design time from|Y
01|228735|1|4|receipt of PO. Once approval drawing is signed expect|Y
01|228735|1|5|12 weeks for manufacturing and shipping.|Y
01|228735|49|1|-2pc: $6808.80 ea/net|Y
01|228735|49|2|-Special net price with minimum order quantity of 2 pc.|Y
01|228735|49|3|-Delivery: please allow 4 weeks for design time from|Y
01|228735|49|4|receipt of PO. Once approval drawing is signed expect|Y
01|228735|49|5|12 weeks for manufacturing and shipping.|Y
01|228736|2|1|Installation inlcudes: Drive unit short bar fiber|Y
01|228736|2|2|optic cable communications cable bulkhead cables|Y
01|228736|2|3|external cables paramter changes service time and|Y
01|228736|2|4|travel.|Y
01|228739|6|1|A tariff surcharge may be added to this quotation in|Y
01|228739|6|2|the event of a sustained tariff increase on the|Y
01|228739|6|3|importation of this product.  Any surcharge will be|Y
01|228739|6|4|disclosed prior to acceptance of an order.|Y
01|228743|1|1|5AX-N400FA-8+1PRJ SN:3103|Y
01|228743|1|2|Replacement Parts|Y
01|228743|2|1|Repair 5AX-N400FA-8+1PRJ SN:3103|Y
01|228743|2|2|FOR X2 TECH 3 DAY LABOR|Y
01|228743|3|1|EXPEDITED SERVICE FEE TRAVEL EXPENSES ETC.|Y
01|228743|3|2|FOR X2 TECH|Y
01|228743|16|1|5AX-N400FA-8+1PRJ SN:3103|Y
01|228743|16|2|Tabel crash needs evaluation|Y
01|228743|16|3|Minimum 4 hour labor X1 TECH|Y
01|228743|16|4|Performed 2/26/2025|Y
01|228743|17|1|EXPEDITED SERVICE FEE AIRFARE ETC.|Y
01|228743|17|2|Performed 2/26/2025|Y
01|228754|1|1|RGA#LVR-61597/|Y
01|228754|1|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 20905241 11|Y
01|228754|1|3|(Mimatic#193643)|Y
01|228754|2|1|Bearings seals o-rings damaged spindle M42 & M65|Y
01|228754|2|2|threadrings to be replaced.|Y
01|228754|4|1|RGA#LVR-61597/|Y
01|228754|4|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 20902100 01|Y
01|228754|4|3|(Mimatic#193643)|Y
01|228754|5|1|Bearings seals o-rings damaged spindle M15 & M65|Y
01|228754|5|2|threadrings to be replaced.|Y
01|228754|7|1|RGA#LVR-61597/|Y
01|228754|7|2|Repair of MNZ20-SK16X-ICE-12K s/n: 20905017 18|Y
01|228754|7|3|(Mimatic#193568)|Y
01|228754|8|1|Bearings seals o-rings and damaged spindle to be|Y
01|228754|8|2|replaced.|Y
01|228779|1|1|LIST = $6534.00|Y
01|228779|1|2|DISCOUNTED TO ASSIST IN CUSTOMER SATISFACTION DUE|Y
01|228779|1|3|IMPROPER SELECTION AT SALES LEVEL.|Y
01|228779|1|4|-APPROVED BY CHRISD|Y
01|228779|2|1|YOU WILL NEED TO TRANSFER LOCK PIN PA110 FROM|Y
01|228779|2|2|YOUR ORIGINAL C50-MRAM ASSEMBLY|Y
01|228780|1|1|P/N: TBD|Y
01|228780|1|2|BMT75 Capto 5 90Deg Live Tool IntExt Coolant; 1:1 Ratio|Y
01|228780|1|3|6K RPM|Y
01|228785|2|1|Quoted at NET price.|Y
01|228789|1|1|RGA#LVR-61597/|Y
01|228789|1|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 20905241 11|Y
01|228789|1|3|(Mimatic#193643)|Y
01|228789|2|1|Bearings seals and o-rings to be replaced. Rebuild to|Y
01|228789|2|2|external coolant includes 1 reconditioned spindle.|Y
01|228789|2|3|Change ID plate to 196235 external coolant version with|Y
01|228789|2|4|the same s/n.|Y
01|228789|4|1|RGA#LVR-61597/|Y
01|228789|4|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 20902100 01|Y
01|228789|4|3|(Mimatic#193643)|Y
01|228789|5|1|Bearings seals and o-rings to be replaced. Rebuild to|Y
01|228789|5|2|external coolant includes 1 reconditioned spindle.|Y
01|228789|5|3|Change ID plate to 196235 external coolant version with|Y
01|228789|5|4|the same s/n.|Y
01|228789|7|1|RGA#LVR-61597/|Y
01|228789|7|2|Repair of MNZ20-SK16X-ICE-12K s/n: 20905017 18|Y
01|228789|7|3|(Mimatic#193568)|Y
01|228789|8|1|Bearings seals and o-rings to be replaced. Rebuild to|Y
01|228789|8|2|external coolant includes 1 reconditioned spindle.|Y
01|228789|8|3|Change ID plate to 193569 external coolant version with|Y
01|228789|8|4|the same s/n|Y
01|228791|1|1|Req.INS/Check Alignment/Stock|Y
01|228796|1|1|T/P Inspection Required|Y
01|228796|2|1|T/P Inspection Required|Y
01|228800|1|1|FOR HYUNDAI WIA KF5600B/50 FANUC Oi-F+ CONTROL|Y
01|228800|5|1|For Makino PS105 400V drives Fanuc Oi-F ProP|Y
01|228800|7|1|FOR MAKINO PS105 W/ HV DRIVES|Y
01|228818|1|1|Flat machining is required. See Modification-Charge.|Y
01|228818|2|1|Machine flat onto the straight shank of E25-EXT-125.|Y
01|228824|1|1|Demo unit|Y
01|228828|1|1|Quoted at NET price.|Y
01|228834|1|1|RGA#TAR-61631|Y
01|228834|1|2|5AX-2002FA-M|Y
01|228834|1|3|SN: 2280|Y
01|228838|1|1|RGA#TAR-61647|Y
01|228838|1|2|5AX-2002FA-M|Y
01|228838|1|3|SN: 1607|Y
01|228851|1|1|RGA#CUR-61635/|Y
01|228851|1|2|Repair of C50RAM-ER32-180TS s/n: 13147 01|Y
01|228851|1|3|(Mimatic#135725)|Y
01|228851|2|1|Bearings seals o-rings and damaged spindle to be|Y
01|228851|2|2|replaced.|Y
01|228856|3|1|Item qualifies for additional 20% Overstock discount|Y
01|228856|3|2|Discount has been added to your 40% discount.|Y
01|228856|3|3|Final Sale|Y
01|228859|3|1|TAT/SUPPRT TABLE FOR TRUNNION ASSEMBLY|Y
01|228859|4|1|ROTARY JOINT FOR THRU CENTER HYDRAULICS/PNUEMATICS|Y
01|228859|5|1|WILL BE 15 WIDE BY 18 LONG|Y
01|228859|5|2|PART NUMBER WILL LIKELY BE:|Y
01|228859|5|3|-TRUNNION-STALLION-15/18|Y
01|228859|6|1|CUSTOM BASEPLATE FOR ROTARY/TAT/TRUNNION.|Y
01|228859|6|2|WILL BE KEYED TO MATCH THE TABLE.|Y
01|228859|6|3|PLATE WILL BE 1.25 THICK|Y
01|228859|6|4|DNM7500L-50|Y
01|228865|3|1|Overstock promotion extra discount has been added to|Y
01|228865|3|2|the quote. We only have one in stock and 4 gage is|Y
01|228865|3|3|all we have. Thank you|Y
01|228871|2|1|Please note additional 20% applied per overstock promo.|Y
01|228871|2|2|These items cannot be cancelled or returned upon|Y
01|228871|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|228871|2|4|need to be requoted.|Y
01|228894|3|1|Includes: Drive unit short barfiber optic cable|Y
01|228894|3|2|bulkhead cables external cables and cable management|Y
01|228894|3|3|paramter changes service time and travel.|Y
01|228896|1|1|RGA#TAR-61630|Y
01|228896|1|2|5AX-350FA|Y
01|228896|1|3|SN: 3523|Y
01|228900|3|1|A tariff surcharge may be added to this quotation in|Y
01|228900|3|2|the event of a sustained tariff increase on the|Y
01|228900|3|3|importation of this product.  Any surcharge will be|Y
01|228900|3|4|disclosed prior to acceptance of an order.|Y
01|228908|1|1|NO COOLANT THRU CENTER|Y
01|228908|1|2|COOLANT CAN BE ROUTED THROUGH POSITIONING BLOCK|Y
01|228908|1|3|BUT BLOCK DESIGN MUST INCLUDE THAT IN THE DESIGN|Y
01|228908|2|1|COOLANT THRU SPINDLE TAPER COOLANT MUST BE RAN|Y
01|228908|2|2|AT ALL TIMES|Y
01|228908|5|1|STANDARD POSITIONING BLOCK FOR HAAS CAT40 6 SCREW|Y
01|228908|5|2|THIS BLOCK DESIGN IS NOT SETUP FOR ACCEPTING|Y
01|228908|5|3|COOLANT THRU THE BLOCK|Y
01|228911|1|1|Currently one (1) in stock balance of one (1) lead|Y
01|228911|1|2|time is approximately 5~7 weeks.|Y
01|228920|1|1|RGA#LVR-61599/|Y
01|228920|1|2|Repair of MZMP5-ER40X-OFF-ICE s/n:59664 03|Y
01|228920|1|3|(Mimatic#131556)|Y
01|228920|2|1|Bearings seals o-rings and damaged output spindle to|Y
01|228920|2|2|be replaced.|Y
01|228922|1|1|Req.INS/INstall E16-NUT & ER16-SCREW(C)|Y
01|228923|5|1|Includes:24 3-jaws steel heavy duty scroll chuck with|Y
01|228923|5|2|adapter plate 6.5 thru bore|Y
01|228928|2|1|*Qty discount for 5C collets does not apply if|Y
01|228928|2|2|purchased separately from the set.|Y
01|228930|1|1|Positioning Block for NIKKEN BT40-THM-100 on HAAS GM-2|Y
01|228930|1|2|Currency:USD|Y
01|228932|1|1|RGA#LVR-61661/|Y
01|228932|1|2|Repair of MNL12-ER32Z-ICE-10K s/n: 19908584 01|Y
01|228932|1|3|(Mimatic#101523)|Y
01|228932|2|1|Bearings seals and o-rings to be replaced|Y
01|228937|1|1|5AX-800FA-RCN2-RJ6 SN:2002|Y
01|228937|1|2|Evaluation & Repair Center Shaft|Y
01|228937|3|1|A tariff surcharge of 8% will be added to every order|Y
01|228937|3|2|placed after September 1st 2025(until further notice).|Y
01|228937|3|3|This surcharge will be acknowledged upon acceptance|Y
01|228937|3|4|of every order.|Y
01|228944|1|1|VISE STEP KEY FOR 5AX-201 T-SLOT (2 REQRD.)|Y
01|228969|7|1|Currently five (5) in stock balance of two (2) ETA is|Y
01|228969|7|2|2~4 weeks after receipt of an order.|Y
01|228979|2|1|MAZAK CUSTOM POSITIONING BLOCK|Y
01|228990|1|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|228990|2|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|228990|3|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|228990|4|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|228990|5|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|228990|6|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|228990|7|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|228990|8|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|228990|9|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|228990|10|1|*C6-TUBE-1 + BIS-C-122-04/L Chip installed at LN|Y
01|228996|4|1|A tariff surcharge may be added to this quotation in|Y
01|228996|4|2|the event of a sustained tariff increase on the|Y
01|228996|4|3|importation of this product.  Any surcharge will be|Y
01|228996|4|4|disclosed prior to acceptance of an order.|Y
01|228998|1|1|FOR DN SOLUTIONS DNM6700 W/ FANUC Oi-MF+|Y
01|228998|3|1|PACKAGE DISCOUNTED|Y
01|228998|6|1|NET PRICE FOR CUSTOM 1.5 TOOLING PLATE TRUNNION...|Y
01|228998|6|2|COMPATIBLE WITH CUSTOMERS EXISTING JERGENS FIXTURE...|Y
01|228998|6|3|PLATES. BALL LOCK RECEIVERS 49501 TO MATCH EXISTING...|Y
01|228998|6|4|APPROVAL DRAWINGS PROVIDED POST ORDER.|Y
01|228998|6|5|TRUNNION PACKAGE INCLUDES 105mm CHEEK PLATE 85mm...|Y
01|228998|6|6|CHEEK PLATE. 33 WIDE DUAL 16 BALL LOCK TRUNNION PLATE|Y
01|228998|6|7|PLAIN FINISH 6061 ALLOY OR TOOLING PLATE GRADE ALUM.|Y
01|228998|6|8|INCLUDES ALL MOUNTING HARDWARE 8-49501 RECEIVERS ...|Y
01|228998|6|9|2-10mm DOWELS FACEPLATE MOUNTING KITS (2) 2-2 RISERS|Y
01|228998|6|10|EXCLUDED: BALL LOCK PLATES PINS & LINERS.|Y
01|228998|7|1|ZEMAN TOOL QUOTE 250789SM (LESS RISERS)|N
01|228998|7|2|NET $9010|N
01|228998|7|3|DESIGN & ENGINEERING -DANA|N
01|228998|7|4|NET $1500|N
01|229015|1|1|RGA#LVR-61640/|Y
01|229015|1|2|Repair of MNZ20-SK16X-ICE-12K s/n:20902074 02|Y
01|229015|1|3|(Mimatic#193568)|Y
01|229015|2|1|Bearings seals & o-rings to be replaced. Rebuild to|Y
01|229015|2|2|external coolant includes 1 reconditioned spindle.|Y
01|229015|2|3|Change ID plate to 196235 external coolant version with|Y
01|229015|2|4|the same serial#.|Y
01|229015|4|1|RGA#LVR-61641/|Y
01|229015|4|2|Repair of MNZ20-SK16X-ICE-12K s/n: 22905415 01|Y
01|229015|4|3|(Mimatic193568)|Y
01|229015|5|1|Bearings seals and o-rings to be replaced. Rebuild to|Y
01|229015|5|2|external coolant. Change ID plate to 196235 external|Y
01|229015|5|3|coolant version with the same serial#.|Y
01|229015|7|1|RGA#LVR-61642/|Y
01|229015|7|2|Repair of MNZ20-SK16X-ICE-12K s/n: 20905017 10|Y
01|229015|7|3|(Mimatic#193568)|Y
01|229015|8|1|Bearings seals and o-rings to be replaced. Rebuild to|Y
01|229015|8|2|external coolant includes 1 reconditioned spindle.|Y
01|229015|8|3|Change ID plate to 196235 external coolant version with|Y
01|229015|8|4|the same serial#.|Y
01|229015|10|1|RGA#LVR-61642/|Y
01|229015|10|2|Repair of MNZ20-SK16X-ICE-12K s/n: 20905017 17|Y
01|229015|10|3|(Mimatic#193568)|Y
01|229015|11|1|Bearings seals & o-rings to be replaced. Rebuild to|Y
01|229015|11|2|external coolant. Change ID plate to 196235 external|Y
01|229015|11|3|coolant version with the same serial#.|Y
01|229022|6|1|*Not Hi-Speed rated for 12K RPM. Only DualContact|Y
01|229022|6|2|available.|Y
01|229024|1|1|For Makino PS105 400V drives Fanuc Oi-F ProP|Y
01|229024|2|1|Faceplate height at 0 deg. = 270mm|Y
01|229024|2|2|Faceplate Centerline Height at 90deg. = 180mm|Y
01|229024|9|1|Location key and installation hardware kit|Y
01|229024|9|2|for M120S to 5AX-201 Tilt Rotary table|Y
01|229034|6|1|Additional 20% overstock promo discount applied to all|Y
01|229034|6|2|items above. These items cannot be cancelled or|Y
01|229034|6|3|returned upon receipt of a PO|Y
01|229039|1|1|Lead time is 3~5 days delivery after receipt of an|Y
01|229039|1|2|order.  This is for a Haas VF11 CAT50 holder.|Y
01|229042|1|1|PRICE ADJUSTMENT FOR 5AX-201 ON ORDER 1022608|Y
01|229042|3|1|ZeroVise Work Holding Promo - Free with Rotary|Y
01|229042|3|2|table purchase.|Y
01|229042|3|3|List price adjustment to 5AX-201|Y
01|229042|3|4|Discounts were taken in lieu of processing via|Y
01|229042|3|5|tooling certificate promo.  TC cancelled.|Y
01|229042|3|6|03/05/25 -danas|Y
01|229054|5|1|A tariff surcharge may be added to this quotation in|Y
01|229054|5|2|the event of a sustained tariff increase on the|Y
01|229054|5|3|importation of this product.  Any surcharge will be|Y
01|229054|5|4|disclosed prior to acceptance of an order.|Y
01|229055|25|1|A tariff surcharge may be added to this quotation in|Y
01|229055|25|2|the event of a sustained tariff increase on the|Y
01|229055|25|3|importation of this product.  Any surcharge will be|Y
01|229055|25|4|disclosed prior to acceptance of an order.|Y
01|229056|1|1|For DN Solutions Mynx 7500 VMC w/ Fanuc Oi-MF+|Y
01|229056|2|1|Faceplate height at 0 deg. = 270mm|Y
01|229056|2|2|Faceplate Centerline Height at 90deg. = 180mm|Y
01|229056|9|1|Location key and installation hardware kit|Y
01|229056|9|2|for M120S to 5AX-201 Tilt Rotary table|Y
01|229056|10|1|NOTE TO ISS: REDUCE NET PRICE OF TABLE THE PROMOTIONAL|N
01|229056|10|2|VALUE HERE OF $-1368.75|N
01|229060|1|1|P/N: BMT65-STC4ZY-MSD-IC|Y
01|229060|1|2|BMT65 Static PSC C4 <Y-Ax) 90Deg|Y
01|229072|1|1|In order to get delivery mid-to-end of April order|Y
01|229072|1|2|needs to be placed by April 3rd.|Y
01|229074|2|1|BT40-C25-90G|Y
01|229074|6|1|HSK63A-C20-95G|Y
01|229074|7|1|HSK63A-MMC20C-125-ATB|Y
01|229074|8|1|VMK20-20-H|Y
01|229074|9|1|VMK20-20J-H|Y
01|229074|10|1|HSK63A-SF20EX-145B|Y
01|229074|10|2|NET PRICE|Y
01|229075|1|1|FOR HYUNDAI WIA KF5II High Column Fanuc Oi-MF+|Y
01|229075|1|2|no price change for Makino PS105 HV drive/motor|Y
01|229078|1|1|BMT45 ER16 OFFSET X AXIS (STRAIGHT) LIVE TOOL|Y
01|229078|1|2|1:3 GEAR RATIO (18K RPM MAX); EXTERNAL COOLANT ONLY|Y
01|229078|1|3|-3 PC: $7600 EA/NET|Y
01|229078|1|4|-SPECIAL NET PRICE WITH MINIMUM ORDER QUANTITY OF 3 PC.|Y
01|229078|1|5|-DELIVERY: 4 WEEKS FOR APPROVAL DRAWING AFTER RECEIPT|Y
01|229078|1|6|OF PO. ONCE APPROVAL DRAWING IS SIGNED 10 WEEKS|Y
01|229078|1|7|MANUFACTURING & 1-2 WEEKS FOR SHIPPING|Y
01|229078|25|1|BMT45 ER25 Z AXIS (90 DEGREE) LIVE TOOL; 1:2 GEAR|Y
01|229078|25|2|RATIO (12K RPM MAX); EXTERNAL COOLANT ONLY|Y
01|229078|25|3|-3 PC: $6808 EA/NET|Y
01|229078|25|4|-SPECIAL NET PRICE WITH MINIMUM ORDER QUANTITY OF 3 PC.|Y
01|229078|25|5|-DELIVERY: 4 WEEKS FOR APPROVAL DRAWING AFTER RECEIPT|Y
01|229078|25|6|OF PO. ONCE APPROVAL DRAWING IS SIGNED 10 WEEKS|Y
01|229078|25|7|MANUFACTURING & 1-2 WEEKS FOR SHIPPING|Y
01|229078|46|1|BMT45 ER25 Z AXIS (90 DEGREE) LIVE TOOL; 1:2 GEAR|Y
01|229078|46|2|RATIO (13000 RPM MAX); INTERNAL/EXTERNAL COOLANT|Y
01|229078|46|3|-3 PC: $6470 EA/NET|Y
01|229078|46|4|-SPECIAL NET PRICE WITH MINIMUM ORDER QUANTITY OF 3 PC.|Y
01|229078|46|5|-DELIVERY: 4 WEEKS FOR APPROVAL DRAWING AFTER RECEIPT|Y
01|229078|46|6|OF PO. ONCE APPROVAL DRAWING IS SIGNED 10 WEEKS|Y
01|229078|46|7|MANUFACUTRING & 1-2 WEEKS SHIPPING|Y
01|229080|1|1|LOCATION STEP KEY SET MOUNTING HARDWARE PAIR OF|Y
01|229080|1|2|T-NUTS AND BOLTS TO SECURE TOE CLAMPS|Y
01|229080|1|3|INCLUDES E12 SOCKET FOR OPERATING|Y
01|229080|1|4|ALREADY PROVIDED BY STEVE LENNIHAN|Y
01|229082|1|1|Placeholder for HSK100A-C1.1/4-200.|Y
01|229082|1|2|-1~9pc: $944 ea/net|Y
01|229082|1|3|-10+pc: $838 ea/net|Y
01|229082|2|1|Placeholder for HSK100A-C1.1/4-203.2.|Y
01|229082|2|2|-1~9pc: $950 ea/net|Y
01|229082|2|3|-10+pc: $844 ea/net|Y
01|229082|2|4|Please note items listed above are non-standard stock|Y
01|229082|2|5|and considered specials. Once a PO has been issued|Y
01|229082|2|6|these items cannot be cancelled or returned.|Y
01|229088|3|1|A tariff surcharge may be added to this quotation in|Y
01|229088|3|2|the event of a sustained tariff increase on the|Y
01|229088|3|3|importation of this product.  Any surcharge will be|Y
01|229088|3|4|disclosed prior to acceptance of an order.|Y
01|229093|3|1|Currently 15 in stock balance of 5 ETA would be end|Y
01|229093|3|2|of March after receipt of an order.|Y
01|229094|1|1|60462|Y
01|229094|2|1|60461|Y
01|229094|3|1|60463|Y
01|229094|4|1|60468|Y
01|229094|5|1|60465|Y
01|229094|6|1|A tariff surcharge may be added to this quotation in|Y
01|229094|6|2|the event of a sustained tariff increase on the|Y
01|229094|6|3|importation of this product.  Any surcharge will be|Y
01|229094|6|4|disclosed prior to acceptance of an order.|Y
01|229111|11|1|A tariff surcharge may be added to this quotation in|Y
01|229111|11|2|the event of a sustained tariff increase on the|Y
01|229111|11|3|importation of this product.  Any surcharge will be|Y
01|229111|11|4|disclosed prior to acceptance of an order.|Y
01|229112|1|1|Part Number: C5001-22-250|Y
01|229112|1|2|CAT50 Shell Mill Holder 22mm 250mm Gage Length|Y
01|229112|1|3|.|Y
01|229112|1|4|QTY Break NET Pricing:|Y
01|229112|1|5|1-2 pcs: $898.00|Y
01|229112|1|6|3+  pcs: $598.00|Y
01|229112|2|1|Part Number: C5001-22-300|Y
01|229112|2|2|CAT50 Shell Mill Holder 22mm 300mm Gage Length|Y
01|229112|2|3|.|Y
01|229112|2|4|QTY Break NET Pricing:|Y
01|229112|2|5|1-2 pcs: $938.00|Y
01|229112|2|6|3+  pcs: $638.00|Y
01|229112|3|1|Part Number: CAT50-C42-250-IDU|Y
01|229112|3|2|CAT50 Milling Chuck 42mm 250mm Gage Length can be|Y
01|229112|3|3|sleeved down with any KM42 collet|Y
01|229112|3|4|.|Y
01|229112|3|5|QTY Break NET Pricing:|Y
01|229112|3|6|1 pc: $1662.00|Y
01|229112|3|7|2+pcs: $1362.00|Y
01|229114|1|1|Replaced B5017-1000-5.50|Y
01|229114|9|1|BT50-C2-105 has been quoted at NET pricing.|Y
01|229114|9|2|Estimated lead time is five (5) months after receipt of|Y
01|229114|9|3|an order.Non-cancellable/Non-returnable once purchase|Y
01|229114|9|4|order has been received.|Y
01|229121|1|1|Req.INS/Check Alignment/Cosmetic|Y
01|229123|1|1|INS Req'd:97247/PTS/AISIN >12/13/24 APRVD|Y
01|229123|1|2|NIKKEN #LY-2774 3/11~13A|N
01|229124|2|1|Please note additional 20% applied per overstock promo.|Y
01|229124|2|2|These items cannot be cancelled or returned upon|Y
01|229124|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|229124|2|4|need to be requoted.|Y
01|229125|1|1|Part # PRE-E81B-I50  E81B Presetter CAT50|Y
01|229125|1|2|Quoted at NET price.|Y
01|229125|3|1|Quoted at NET price.|Y
01|229125|6|1|A tariff surcharge may be added to this quotation in|Y
01|229125|6|2|the event of a sustained tariff increase on the|Y
01|229125|6|3|importation of this product.  Any surcharge will be|Y
01|229125|6|4|disclosed prior to acceptance of an order.|Y
01|229132|6|1|Hardwired cables included.|Y
01|229132|6|2|Polar detect option required.|Y
01|229143|2|1|Installation inlcudes: Drive unit short bar fiber|Y
01|229143|2|2|optic cable communications cable bulkhead cables|Y
01|229143|2|3|external cables paramter changes service time and|Y
01|229143|2|4|travel.|Y
01|229161|1|1|HSK40E-ER11-75 Collet Chuck Hex Nut|Y
01|229161|1|2|SPECIAL-TL Qty 50+ >>>> Net Price $150/each|Y
01|229161|1|3|SPECIAL-TL Qty 40-49 >>>> Net Price $160/each|Y
01|229161|1|4|SPECIAL-TL Qty 30-39 >>>> Net Price $170/each|Y
01|229162|1|1|Part Number: C5001-32-4.25CP|Y
01|229162|1|2|CAT50 Shell Mill Holder 32mm 4.25 Gage Length|Y
01|229162|1|3|with CoolantPorts|Y
01|229162|1|4|*Lead time given as ADA - After Signed Drawing Approval|Y
01|229162|1|5|Please allow 1-2 weeks for production of approval dwg|Y
01|229169|1|1|This item cannot be cancelled or returned upon receipt|Y
01|229169|1|2|of PO/order.|Y
01|229171|6|1|This is an alternative to the HSK40A-R0562-2.97(C) if|Y
01|229171|6|2|the customer doesn't want coolant thru.|Y
01|229176|1|1|HSK63A(80)-Q34-105 Modular Boring Base/Master Holder|Y
01|229176|1|2|Q34 w/ 105mm gl|Y
01|229176|2|1|HSK63A(80)-Q34-150 Modular Boring Base/Master Holder|Y
01|229176|2|2|Q34 w/ 150mm gl|Y
01|229176|3|1|HSK63A(80)-Q42-105 Modular Boring Base/Master Holder|Y
01|229176|3|2|Q42 w/ 105mm gl|Y
01|229176|4|1|HSK63A(80)-Q42-150 Modular Boring Base/Master Holder|Y
01|229176|4|2|Q42 w/ 150mm gl|Y
01|229176|6|1|HSK63A(80)-Q16-105 Modular Boring Base/Master Holder|Y
01|229176|6|2|Q16 w/ 105mm gl|Y
01|229176|7|1|HSK63A(80)-Q20-105 Modular Boring Base/Master Holder|Y
01|229176|7|2|Q20 w/ 105mm gl|Y
01|229180|2|1|Above tool is on the Lyndex-Nikken Overstock list.|Y
01|229180|2|2|I have added extra discount.|Y
01|229182|1|1|180 tool assemblies at an average cost of $500ea.|Y
01|229182|1|2|Includes retention knob and collet|Y
01|229183|1|1|Budget based on average list price cost of $600ea.|Y
01|229183|1|2|Includes retention knob and collet where appicable|Y
01|229183|1|3|Mix of standard and advanced tooling technology|Y
01|229187|1|1|for HSK63A-HC0500-90 Hydraulic Chucks|Y
01|229187|2|1|A tariff surcharge may be added to this quotation in|Y
01|229187|2|2|the event of a sustained tariff increase on the|Y
01|229187|2|3|importation of this product.  Any surcharge will be|Y
01|229187|2|4|disclosed prior to acceptance of an order.|Y
01|229195|1|1|Placeholder for HSK63F-SF0375-3.35B.|Y
01|229195|1|2|Haimer cross from MSC part #69267961.|Y
01|229195|1|3|HSK63F shrink fit holder for 3/8 with 3.35 GL.|Y
01|229195|1|4|Quantity Break Net Pricing:|Y
01|229195|1|5|1-4pc: $573.00 ea/net|Y
01|229195|1|6|5pc +: $285.00 ea/net|Y
01|229199|1|1|Includes Table with stand alone controller|Y
01|229199|1|2|Pendant and power cables|Y
01|229215|1|1|CUSTOM PART STOP FOR THRU SUB SPINDLE COOLANT|Y
01|229215|1|2|PER DRAWING COOLANTSTOP|Y
01|229215|1|3|SPECIAL DESIGN FOR OKUMA OPTION|Y
01|229215|1|4|MOQ 2) PCS.|Y
01|229215|1|5|VENDOR = HME-TOOL; CURTIS HUMMEL; NET = $750.EA.|N
01|229215|2|1|Using this part number for Line# 1|Y
01|229215|3|1|CUSTOM COOLANT INDUCER 22MM TO SUPPORT THRU|Y
01|229215|3|2|SUBSPINDLE COOLANT OPTION FROM OKUMA -LT2000EX|Y
01|229215|3|3|PER DRAWING COOLANT_INDUCER|Y
01|229215|3|4|MOQ (2) PCS.|Y
01|229215|3|5|VENDOR = HME-TOOL; CURTIS HUMMEL; NET =$320EA.|N
01|229215|4|1|Using this part number for Line# 3|Y
01|229217|1|1|Part# TBD  **NET Price**|Y
01|229217|1|2|HW-15-QC with A2-11 adapter plate installed and|Y
01|229217|1|3|threaded drawscrew.|Y
01|229219|1|1|match with SN#25532T|Y
01|229219|1|2|includes the following accessories|Y
01|229219|1|3|TCD-21193 (6+1PRJ)|Y
01|229219|1|4|TCE-A7026 (power signal cable)|Y
01|229219|1|5|TCE-94808 (feeg back cable)|Y
01|229225|9|1|*3 Pcs are a cross for the B30F-16ERP248|Y
01|229231|22|1|Delivery: 1-2 Wks ARO after 4/10/25|Y
01|229235|1|1|Please note: This tool is non standard stock. Once a|Y
01|229235|1|2|purchase order is placed it cannot be cancelled or|Y
01|229235|1|3|returned.|Y
01|229242|1|1|Please Note: We will provide a approval drawing if|Y
01|229242|1|2|order is placed. This item is Special once an order|Y
01|229242|1|3|is placed it cannot be cancelled or returned.|Y
01|229244|1|1|Req.INS/Cosmetic Check|Y
01|229258|3|1|Tilt axis scale includes mounting kit +/-10|Y
01|229258|4|1|5AX-1200AWAR21 A version|Y
01|229263|9|1|Part#180103 ER32 angle unit 1:2 ICE|Y
01|229263|9|2|Item can not be cancelled or returned once PO received.|Y
01|229263|9|3|KEEP|N
01|229268|1|1|CAT40 Right Angle Head ER32 Output 3-Pin Support|Y
01|229268|1|2|DualContact IntExtCoolant for Doosan DNM750L|Y
01|229268|1|3|Similar to C40RAM-ER32-180ICE-65TP|Y
01|229268|1|4|Qty break: 2+ pcs=$8334.20/EA (NET)|Y
01|229268|1|5|*These are custom application units for specific|Y
01|229268|1|6|application. Units are non-returnable and|Y
01|229268|1|7|non-cancellable once a PO has been placed.|Y
01|229268|1|8|Delivery:|Y
01|229268|1|9|4-5 weeks design 8-9 weeks Manufacturing ADA - After|Y
01|229268|1|10|Signed Drawing Approval is received.|Y
01|229268|3|1|This option is Lyndex Nikken designing and making the|Y
01|229268|3|2|positioning block.  Spindle dimensions required.|Y
01|229268|4|1|A tariff surcharge may be added to this quotation in|Y
01|229268|4|2|the event of a sustained tariff increase on the|Y
01|229268|4|3|importation of this product.  Any surcharge will be|Y
01|229268|4|4|disclosed prior to acceptance of an order.|Y
01|229269|1|1|Replacement collet nut for Nikken 100DA Collet Chuck:|Y
01|229269|1|2|BT50-DW3-105|Y
01|229280|1|1|NSK/CHA style collet 5.0mm-high speed pencil grinder.|Y
01|229280|1|2|https://www.artcotools.com/products/nsk-nakanishi|Y
01|229280|1|3|-cha-collet|Y
01|229280|3|1|NSK/CHA style collet 6.0mm-high speed pencil grinder.|Y
01|229280|3|2|https://www.artcotools.com/products/nsk-nakanishi|Y
01|229280|3|3|-cha-collet|Y
01|229291|1|1|Installation includes: Drive unit short bar fiber|Y
01|229291|1|2|optic cablescommunications cables bulkhead cables|Y
01|229291|1|3|external cables and cable management.|Y
01|229300|1|1|RGA#LVR-61567/|Y
01|229300|1|2|Repair of MU55-SK16Z-125-ICE s/n: 22907059 01|Y
01|229300|1|3|(Mimatic#201362)|Y
01|229300|2|1|Bearings seals and o-rings to be replaced. Recondition|Y
01|229300|2|2|1 spindle.|Y
01|229305|1|1|RGA#TOR-61682/|Y
01|229305|1|2|Repair of CAT40-NPU13-105U-IDU|Y
01|229305|5|1|RGA#TOR-61682/|Y
01|229305|5|2|Repair of CAT40-NPU13-105U-IDU|Y
01|229306|1|1|*Overstock - considered specials extra 20% discount.|Y
01|229306|1|2|All sales are final 3 pcs in stock cannot be ordered|Y
01|229306|1|3|once stock depleted.|Y
01|229306|2|1|Part Number: BT40-SF12-90CP|Y
01|229306|2|2|BT40 Shrink-Fit Holder 12mm CoolantPorts 20K|Y
01|229306|3|1|*Overstock - considered specials extra 20% discount.|Y
01|229306|3|2|All sales are final 2 pcs in stock cannot be ordered|Y
01|229306|3|3|once stock depleted.|Y
01|229311|2|1|LN to thread blank drawscrew **NET PRICE**|Y
01|229330|2|1|This is a non-stock item and considered special. Once|Y
01|229330|2|2|a PO has been issued it cannot be cancelled or returned|Y
01|229336|1|1|Delivery: Mid-April for PO placed before 3/25.|Y
01|229336|2|1|Final Part# TBD **Quoted at NET Price**|Y
01|229336|2|2|**Non-cancellable Non-returnable**|Y
01|229336|2|3|1.1/2 Boring Bar Holder C6 Taper|Y
01|229336|3|1|Final Part# TBD **Quoted at NET Price**|Y
01|229336|3|2|**Non-cancellable Non-returnable**|Y
01|229336|3|3|2 Boring Bar Holder - C6 Taper|Y
01|229336|3|4|.|Y
01|229336|3|5|QTY BREAK NET PRICING:|Y
01|229336|3|6|1-9 pcs: $514.00/ea|Y
01|229336|3|7|10+ pcs: $414.00/ea|Y
01|229340|2|1|Final Part# HSK100A-SZF25C-150-IDU|Y
01|229340|2|2|HSK100A BullsEye ZeroFit Slim Chuck SK25 Coolant 10K|Y
01|229340|2|3|w/ ChipHole|Y
01|229340|2|4|**non-cancellable non-returnable**|Y
01|229356|2|1|A tariff surcharge may be added to this quotation in|Y
01|229356|2|2|the event of a sustained tariff increase on the|Y
01|229356|2|3|importation of this product.  Any surcharge will be|Y
01|229356|2|4|disclosed prior to acceptance of an order.|Y
01|229356|3|1|promotion is for $2000 face value tooling certificate|Y
01|229359|9|1|A tariff surcharge may be added to this quotation in|Y
01|229359|9|2|the event of a sustained tariff increase on the|Y
01|229359|9|3|importation of this product.  Any surcharge will be|Y
01|229359|9|4|disclosed prior to acceptance of an order.|Y
01|229363|4|1|Joint Sleeve|Y
01|229363|5|1|Center Shaft|Y
01|229371|1|1|Req.INS/INstall E16-NUT & ER16-SCREW(C)|Y
01|229371|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|229371|3|1|Req.INS/Install E40-NUT|Y
01|229371|4|1|Req.INS/Install A3/8-24 & 3/4-KEYSET|Y
01|229371|5|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|229371|6|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|229371|7|1|Req.INS/Install S5/8-18X1/2|Y
01|229372|1|1|5AX-201FA-M-AM SN:5111|Y
01|229372|1|2|Mori Duracenter 5A|Y
01|229372|1|3|Scheduled 3/17|Y
01|229374|1|1|-Special non-standard stock: Cannot be cancelled or|Y
01|229374|1|2|returned upon receipt of PO-|Y
01|229391|8|1|A tariff surcharge may be added to this quotation in|Y
01|229391|8|2|the event of a sustained tariff increase on the|Y
01|229391|8|3|importation of this product.  Any surcharge will be|Y
01|229391|8|4|disclosed prior to acceptance of an order.|Y
01|229401|21|1|A tariff surcharge may be added to this quotation in|Y
01|229401|21|2|the event of a sustained tariff increase on the|Y
01|229401|21|3|importation of this product.  Any surcharge will be|Y
01|229401|21|4|disclosed prior to acceptance of an order.|Y
01|229422|1|1|RGA#CUR-61643/|Y
01|229422|1|2|Repair of 184693 s/n: 64957 03 (Mimatic#184693)|Y
01|229422|2|1|Bearings seals o-rings damaged gears input spindle|Y
01|229422|2|2|and threadrings to be replaced.|Y
01|229429|26|1|A tariff surcharge may be added to this quotation in|Y
01|229429|26|2|the event of a sustained tariff increase on the|Y
01|229429|26|3|importation of this product.  Any surcharge will be|Y
01|229429|26|4|disclosed prior to acceptance of an order.|Y
01|229432|6|1|A tariff surcharge may be added to this quotation in|Y
01|229432|6|2|the event of a sustained tariff increase on the|Y
01|229432|6|3|importation of this product.  Any surcharge will be|Y
01|229432|6|4|disclosed prior to acceptance of an order.|Y
01|229441|1|1|Includes: Control box motor cables motor cover|Y
01|229441|1|2|motor gear gear box pendant with 15ft cable power|Y
01|229441|1|3|cable M-code cable|Y
01|229441|2|1|Labor 8 hours|Y
01|229449|1|1|Quoted at NET price.|Y
01|229449|3|1|Quoted at NET price.|Y
01|229492|1|1|Quoted at NET price.|Y
01|229492|3|1|Quoted at NET price.|Y
01|229494|9|1|Non-returnable|Y
01|229494|10|1|CKFN16-12C CCK Coolant Seal Nut/Cap OD16mm ID12mm|Y
01|229494|10|2|Please Note: This item is non standard stock. Once a|Y
01|229494|10|3|purchase order is placed it cannot be cancelled or|Y
01|229494|10|4|returned.|Y
01|229499|8|1|A tariff surcharge may be added to this quotation in|Y
01|229499|8|2|the event of a sustained tariff increase on the|Y
01|229499|8|3|importation of this product.  Any surcharge will be|Y
01|229499|8|4|disclosed prior to acceptance of an order.|Y
01|229502|2|1|A tariff surcharge may be added to this quotation in|Y
01|229502|2|2|the event of a sustained tariff increase on the|Y
01|229502|2|3|importation of this product.  Any surcharge will be|Y
01|229502|2|4|disclosed prior to acceptance of an order.|Y
01|229506|1|1|Quoted at NET price.|Y
01|229506|3|1|Quoted at NET price.|Y
01|229510|3|1|SHANK: BMT68|Y
01|229510|3|2|TOOLING INTERFACE: CAPTO C3|Y
01|229510|3|3|COOLANT: INTERNAL THRU SPINDLE & EXTERNAL THRU PIPING|Y
01|229510|3|4|ROTATION: OUTPUT IS REVERSAL TO INPUT|Y
01|229510|3|5|CENTER HEIGHT: 80MM|Y
01|229510|3|6|GEAR RATIO: 1:2 (6500 INPUT = 13000 OUTPUT)|Y
01|229510|3|7|DRAWING # 00063776-C3|Y
01|229510|3|8|TOOL WEIGHT: APPROX. 8.5 KG|Y
01|229522|2|1|Part Number: NB3001-0500-1.19CP|Y
01|229522|2|2|NBT30 DualContact Shell mill Holder 1/2 CoolantPorts|Y
01|229522|2|3|20K G/l: 1.19|Y
01|229522|2|4|*Lead time given as ADA - After Signed Drawing Approval|Y
01|229522|2|5|Please allow 1-2 weeks for production of an approval|Y
01|229522|2|6|drawing.|Y
01|229525|1|1|Draw screw(#3) for H011MC8(HW-08C-DOD)|Y
01|229525|2|1|Round nut(#6) for H011MC8(HW-08C-DOD)|Y
01|229525|3|1|Spring(#7) for H011MC8(HW-08C-DOD)|Y
01|229525|4|1|Steel Ball(#8) for H011MC8(HW-08C-DOD)|Y
01|229546|1|1|DIN modified holder is non-returnable.|Y
01|229546|1|2|Quoted at NET pricing|Y
01|229557|1|1|HSK40E-SK6-80P|Y
01|229557|1|2|HSK40E Slim Chuck SK6 15K|Y
01|229557|9|1|Currently 14 in stock ETA of balance is 2~3 weeks|Y
01|229557|9|2|after receipt of an order.|Y
01|229574|1|1|TNKQ2503-0566 0006|Y
01|229574|1|2|W/PS-123E Installed At Factory.|Y
01|229574|2|1|TNKQ2503-0566 0006|Y
01|229574|2|2|Installed On S-NC5-46-FMA31.75CS-45-M At Factory.|Y
01|229574|3|1|TNKQ2503-0566 0022|Y
01|229574|4|1|TNKQ2503-0566 0025|Y
01|229575|1|1|PRE-PART-12TRE|Y
01|229575|1|2|Includes: 2D Scanner 1000 Data matrix labels Software|Y
01|229576|1|1|match with SN#41641TC|Y
01|229576|1|2|includes the following accessories|Y
01|229576|1|3|TCE-A7026/9A cable|Y
01|229576|1|4|TCE-A94808/5 cable|Y
01|229576|1|5|TCD-A3515-R. 3+1PRJ|Y
01|229577|1|1|match with SN#41642TC|Y
01|229577|1|2|includes the following accessories|Y
01|229577|1|3|TCE-A7026/9A cable|Y
01|229577|1|4|TCE-A94808/5 cable|Y
01|229577|1|5|TCD-A3515-R. 3+1PRJ|Y
01|229579|10|1|Misc hoses and fittings included|Y
01|229580|2|1|COST = $1497.00|N
01|229580|3|1|COST = $1629.00|N
01|229580|4|1|ATC-ALIGN-KM40|Y
01|229580|4|2|SPECIAL ORDER - 2W|Y
01|229580|4|3|COST = $1583.00|N
01|229582|18|1|Quoted at NET price.|Y
01|229582|19|1|A tariff surcharge may be added to this quotation in|Y
01|229582|19|2|the event of a sustained tariff increase on the|Y
01|229582|19|3|importation of this product.  Any surcharge will be|Y
01|229582|19|4|disclosed prior to acceptance of an order.|Y
01|229595|1|1|RGA#LVR-61686/|Y
01|229595|1|2|Repair of MZQT5-CT40X-OFF-ICE s/n: 24902535 02|Y
01|229595|1|3|(Mimatic#189959)|Y
01|229595|2|1|Bearings seals and o-rings to be replaced.|Y
01|229598|7|1|ADDITIONAL 10% DISCOUNT FROM IMTS PROMO|Y
01|229602|1|1|RGA#TOR-61603/|Y
01|229602|1|2|Repair of SF-START2-UNIT-200 s/n: 2J7059|Y
01|229605|3|1|ST50-SF0250-6.30|Y
01|229606|3|1|SCALE FOR TILT AXIS|Y
01|229606|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|229606|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|229606|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|229606|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|229606|7|1|CUSTOM ADAPTER PLATE FOR 5AX-201 FOR GE FIXTURE|Y
01|229606|7|2|** WILL NEED TO DISCUSS SOME FEATURES ON DRAWING ONCE|Y
01|229606|7|3|PO IS ISSUED ***|Y
01|229613|1|1|These are non-standard stock items and considered|Y
01|229613|1|2|specials. Once a PO has been issued these items cannot|Y
01|229613|1|3|be cancelled or returned.|Y
01|229613|2|1|Net charge to modify/thread blank drawscrew to fit the|Y
01|229613|2|2|customer's Okuma Genos L3000M.|Y
01|229616|1|1|RGA#TAR-61652|Y
01|229616|1|2|5AX-DD200BF2|Y
01|229616|1|3|SN:1119|Y
01|229626|2|1|A tariff surcharge may be added to this quotation in|Y
01|229626|2|2|the event of a sustained tariff increase on the|Y
01|229626|2|3|importation of this product.  Any surcharge will be|Y
01|229626|2|4|disclosed prior to acceptance of an order.|Y
01|229628|1|1|P/N: C5006-1000-24.00|Y
01|229628|1|2|CAT50 1 End Mill Holder with 24 gauge length|Y
01|229628|5|1|P/N: C5006-1250-24.00|Y
01|229628|5|2|CAT50 1.1/4 End Mill Holder with 24.00 gauge length|Y
01|229628|9|1|P/N: C5006-1000-14.00|Y
01|229628|9|2|CAT50 1 End Mill Holder with 14.00 gauge length|Y
01|229628|13|1|P/N: C5006-1000-16.00|Y
01|229628|13|2|CAT50 1 End Mill Holder with 16.00 gauge length|Y
01|229628|17|1|P/N: C5006-1250-14.00|Y
01|229628|17|2|CAT50 1.1/4 End Mill Holder with 14.00 gauge length|Y
01|229628|21|1|P/N: C5006-1250-16.00|Y
01|229628|21|2|CAT50 1.1/4 End Mill Holder with 16.00 gauge length|Y
01|229634|1|1|5AX-N400FA-8+1PRJ SN:3103|Y
01|229634|1|2|Replacement Parts|Y
01|229634|2|1|Repair 5AX-N400FA-8+1PRJ SN:3103|Y
01|229634|2|2|FOR X2 TECH 3 DAY LABOR|Y
01|229634|3|1|EXPEDITED SERVICE FEE TRAVEL EXPENSES ETC.|Y
01|229634|3|2|FOR X2 TECH|Y
01|229634|16|1|5AX-N400FA-8+1PRJ SN:3103|Y
01|229634|16|2|Tabel crash needs evaluation|Y
01|229634|16|3|Minimum 4 hour labor X1 TECH|Y
01|229634|16|4|Performed 2/26/2025|Y
01|229634|17|1|EXPEDITED SERVICE FEE AIRFARE ETC.|Y
01|229634|17|2|Performed 2/26/2025|Y
01|229641|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|229644|12|1|P/N:HSK100A-TC0875-6.62(C)|Y
01|229644|12|2|HSK100A taper Tension/Compression Tap Holder #2|Y
01|229644|53|1|A tariff surcharge may be added to this quotation in|Y
01|229644|53|2|the event of a sustained tariff increase on the|Y
01|229644|53|3|importation of this product.  Any surcharge will be|Y
01|229644|53|4|disclosed prior to acceptance of an order.|Y
01|229645|1|1|Final Part# C5001-40-60CP-IDI  **NET Pricing**|Y
01|229645|1|2|CAT50 Shell Mill Holder 40mm CoolantPorts ChipHole 20K|Y
01|229645|1|3|w/ Balluff Chip BIS-C-122-04/L installed|Y
01|229645|1|4|**Includes price of holder + chip + labor**|Y
01|229645|1|5|**non-cancellable non-returnable**|Y
01|229648|2|1|part# BT30-SK6-150P|Y
01|229648|2|2|BT30 Slim Chuck SK6 HiSpeed|Y
01|229651|1|1|1st batch(w/IDU)>9/12/24:APRVD(TimR)|Y
01|229651|2|1|1st batch(w/IDU)>9/12/24:APRVD(TimR)|Y
01|229661|1|1|Quoted at LIST price|Y
01|229663|1|1|Includes 10 CAT40 inch standard inch size Shrink Fit|Y
01|229663|1|2|Holders with less than 6.00 gauge length.|Y
01|229665|1|1|Includes 10 CAT40 standard inch size Shrink Fit Holders|Y
01|229665|1|2|less than .00 gauge lengths.|Y
01|229673|4|1|**Quoted at NET**|Y
01|229673|4|2|Description|Y
01|229673|4|3|no cancel|Y
01|229680|14|1|*It will be DCNA once stk depleted. 4pc left|Y
01|229691|1|1|Int Cable Power R-Ax|Y
01|229691|1|2|TCE-46076/2 (TCE-6168(1)-J1)|Y
01|229691|2|1|Int Cable Power T-Ax|Y
01|229691|2|2|TCE-46068/1|Y
01|229700|2|1|Please note additional 20% applied per overstock promo.|Y
01|229700|2|2|These items cannot be cancelled or returned upon|Y
01|229700|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|229700|2|4|need to be requoted.|Y
01|229702|2|1|Please note additional 20% applied per overstock promo.|Y
01|229702|2|2|These items cannot be cancelled or returned upon|Y
01|229702|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|229702|2|4|need to be requoted.|Y
01|229709|4|1|Please note additional 20% applied per overstock promo.|Y
01|229709|4|2|These items cannot be cancelled or returned upon|Y
01|229709|4|3|receipt of PO/order. Once stock is depleted these will|Y
01|229709|4|4|need to be requoted.|Y
01|229719|3|1|A tariff surcharge may be added to this quotation in|Y
01|229719|3|2|the event of a sustained tariff increase on the|Y
01|229719|3|3|importation of this product.  Any surcharge will be|Y
01|229719|3|4|disclosed prior to acceptance of an order.|Y
01|229720|39|1|replaces part# SKN-10BJ|Y
01|229721|2|1|Part Number: TBD|Y
01|229721|2|2|Mazak VDI40 Live ER32 Z<Axial>90D Offset HiSpeed|Y
01|229721|2|3|IntExtCool7MP|Y
01|229723|18|1|A tariff surcharge may be added to this quotation in|Y
01|229723|18|2|the event of a sustained tariff increase on the|Y
01|229723|18|3|importation of this product.  Any surcharge will be|Y
01|229723|18|4|disclosed prior to acceptance of an order.|Y
01|229725|1|1|FOR: 5AX-N400FA-8+1PRJ SN:3103|Y
01|229725|14|1|Repair 5AX-N400FA-8+PRJ|Y
01|229725|15|1|Travel Expenses|Y
01|229731|1|1|Right Hand Offset|Y
01|229731|3|1|Right Hand Offset|Y
01|229731|4|1|Left Hand Offset|Y
01|229731|10|1|TWIN OUTPUT Y-OFFSET RADIAL MILLING UNIT #200675x70|Y
01|229731|10|2|MP610 INTERFACE FOR HQR-250 12ST TURRET|Y
01|229731|10|3|ER25 OUTPUT 6500rpm|Y
01|229731|10|4|MOQ 2pcs|Y
01|229731|10|5|PRICING|Y
01|229731|10|6|1-2 = $7048EA.|Y
01|229731|10|7|3-4 = $5785EA.|Y
01|229731|10|8|5 = $5174EA.|Y
01|229743|1|1|non-cancellable non-returnable|Y
01|229743|2|1|Custome Special non-returnable / Non-refundable|Y
01|229745|1|1|5 pieces at factory...3 weeks manufacturing plus|Y
01|229745|1|2|delivery time on remaining 5 pieces.|Y
01|229745|1|3|Please note these are non-standard stock items and|Y
01|229745|1|4|considered specials. Once PO or order has been issued|Y
01|229745|1|5|items cannot be cancelled or returned.|Y
01|229746|1|1|Please note: Quoted at NET price with|Y
01|229746|1|2|RFID BIS-M-122-02/A installed.|Y
01|229756|2|1|Installation includes: Dual axis drive unit short bar|Y
01|229756|2|2|communications cables bulkhead cables external cables|Y
01|229756|2|3|parameter changes service time and travel.|Y
01|229759|1|1|*Lead time given as ADA - After Signed Drawing Approval|Y
01|229759|1|2|Please allow 1-2 weeks for production of approval dwg.|Y
01|229769|22|1|A tariff surcharge of 8% will be added to every order|Y
01|229769|22|2|placed after September 1st 2025(until further notice).|Y
01|229769|22|3|This surcharge will be acknowledged upon acceptance|Y
01|229769|22|4|of every order.|Y
01|229783|1|1|C5-Plug >> Plug for Indexable Holder|Y
01|229785|1|1|Part Number: S32-UMTB|Y
01|229785|1|2|32mm Straight Shank UMT Edge Finder Stylus|Y
01|229786|1|1|Additonal 20% overstock discount added to your standard|Y
01|229786|1|2|discount of 35%. Overstock items are final sale.|Y
01|229786|2|1|Additonal 20% overstock discount added to your standard|Y
01|229786|2|2|discount of 35%. Overstock items are final sale.|Y
01|229797|4|1|3-5 days after design approval.|Y
01|229799|3|1|A tariff surcharge may be added to this quotation in|Y
01|229799|3|2|the event of a sustained tariff increase on the|Y
01|229799|3|3|importation of this product.  Any surcharge will be|Y
01|229799|3|4|disclosed prior to acceptance of an order.|Y
01|229800|2|1|A tariff surcharge may be added to this quotation in|Y
01|229800|2|2|the event of a sustained tariff increase on the|Y
01|229800|2|3|importation of this product.  Any surcharge will be|Y
01|229800|2|4|disclosed prior to acceptance of an order.|Y
01|229804|3|1|Please note this has been added at a special net price.|Y
01|229818|7|1|Will work for the 1/4 collet.|Y
01|229819|3|1|A tariff surcharge may be added to this quotation in|Y
01|229819|3|2|the event of a sustained tariff increase on the|Y
01|229819|3|3|importation of this product.  Any surcharge will be|Y
01|229819|3|4|disclosed prior to acceptance of an order.|Y
01|229821|3|1|NBT40-SK13C-120 placeholder...this is a non-standard|Y
01|229821|3|2|stock item and considered special. Once a PO/order has|Y
01|229821|3|3|been issued these cannot be cancelled or returned.|Y
01|229821|5|1|These are non-standard stock items and considered|Y
01|229821|5|2|specials. Once a PO has been issued these items cannot|Y
01|229821|5|3|be cancelled or returned.|Y
01|229831|1|1|**Quoted at NET price**|Y
01|229831|1|2|This item is special non-standard stock. Cannot be|Y
01|229831|1|3|cancelled or returned upon receipt of a PO.|Y
01|229854|3|1|Not available in 5/6 GL|Y
01|229856|7|1|Mitsubishi motor|Y
01|229864|1|1|BT30 BILZ SERIES #1 QUICK CHANGE TAP HOLDER|Y
01|229864|2|1|CAT40 BILZ SERIES #1 QUICK CHANGE TAP HOLDER|Y
01|229864|3|1|CAT40 BILZ SERIES #2 QUICK CHANGE TAP HOLDER|Y
01|229864|4|1|BILZ SERIES #1 ANSI STANDARD POSITIVE DRIVE TAP|Y
01|229864|4|2|COLLET SET (10 PIECES) PAGE 210 IN CATALOG|Y
01|229864|5|1|BILZ SERIES #1 ANSI STANDARD TORQUE CONTROL TAP|Y
01|229864|5|2|COLLET SET (10 PIECES) PAGE 216 IN CATALOG|Y
01|229864|6|1|BILZ SERIES #2 ANSI STANDARD TORQUE CONTROL TAP|Y
01|229864|6|2|COLLET SET (10 PIECES) PAGE 216 IN CATALOG|Y
01|229864|7|1|BILZ SERIES #2 TO BILZ SERIES #1 ADAPTER|Y
01|229864|7|2|THIS ADAPTER WILL ALLOW YOU TO CONVERT A SERIES #2|Y
01|229864|7|3|ADAPTER INTO A SERIES #1 ADAPTER|Y
01|229873|1|1|Please note these are non-standard stock items and|Y
01|229873|1|2|considered specials. Once PO or order has been issued|Y
01|229873|1|3|these items cannot be cancelled or returned.|Y
01|229876|2|1|Please Note: These back up screws are non-standard|Y
01|229876|2|2|stock. Once a purchase order is placed it cannot be|Y
01|229876|2|3|cancelled or returned.|Y
01|229881|1|1|P/N: CAT50-SK16-400U|Y
01|229881|1|2|CAT50 Taper SK16 Collet Chuck with 400mm  gauge length|Y
01|229881|1|3|This is the longest length available.|Y
01|229881|1|4|Price quoted is 1-9 pieces.|Y
01|229881|6|1|P/N: C5007-0025-16.75|Y
01|229881|6|2|CAT50 taper ER25 collet chuck with 16.75 gauge length|Y
01|229881|6|3|Price quoted is 2-4 pieces; 5-9 pieces|Y
01|229887|1|1|5AX-2002FA SN:2058 1608|Y
01|229887|1|2|Install Pressure Reducing Valve|Y
01|229887|1|3|Replace seals for oil leak|Y
01|229887|1|4|5AX-2002FA SN:2280|Y
01|229887|1|5|Inspection Tilt Axis check thrust parameter etc|Y
01|229887|1|6|Travel Expense for 2/10-12 & 2/24-25|Y
01|229888|1|1|5AX-201YA-M SN:6552 VF-4SS|Y
01|229888|1|2|Initialize Haas Parameter and DWO/TCPC|Y
01|229888|1|3|Minimum 4 hour labor|Y
01|229895|1|1|This is special non-standard stock.  Item is|Y
01|229895|1|2|non-cancellable and non-returnable.|Y
01|229895|1|3|Final part #: BT50-FMH22.225-47-200|Y
01|229895|2|1|A tariff surcharge may be added to this quotation in|Y
01|229895|2|2|the event of a sustained tariff increase on the|Y
01|229895|2|3|importation of this product.  Any surcharge will be|Y
01|229895|2|4|disclosed prior to acceptance of an order.|Y
01|229897|8|1|SRS-13.0|Y
01|229922|4|1|3 IN STOCK AT OUR OFFICE; 3 IN STOCK AT MIMATIC USA|Y
01|229922|4|2|BALANCE TBD|Y
01|229922|7|1|3 IN STOCK IN CHICAGO; TBD ON BALANCE|Y
01|229925|8|1|A tariff surcharge may be added to this quotation in|Y
01|229925|8|2|the event of a sustained tariff increase on the|Y
01|229925|8|3|importation of this product.  Any surcharge will be|Y
01|229925|8|4|disclosed prior to acceptance of an order.|Y
01|229929|1|1|Additional 20% Overstock Promo discount applied.|Y
01|229929|1|2|This item cannot be cancelle or returned.|Y
01|229935|1|1|*quoted at NET price*|Y
01|229935|1|2|Please note this is special non-standard stock. Cannot|Y
01|229935|1|3|be cancelled or returned upon receipt of PO.|Y
01|229936|1|1|w/ PS-123-AIR installed at factory|Y
01|229936|2|1|Installed on NC5-46-SK6C-90 at factory|Y
01|229940|1|1|Final Part# BT50-FMH22.225-47-200|Y
01|229940|1|2|This is special non-standard stock. Item is|Y
01|229940|1|3|non-cancellable and non-returnable.|Y
01|229941|47|1|A tariff surcharge may be added to this quotation in|Y
01|229941|47|2|the event of a sustained tariff increase on the|Y
01|229941|47|3|importation of this product.  Any surcharge will be|Y
01|229941|47|4|disclosed prior to acceptance of an order.|Y
01|229947|3|1|A tariff surcharge may be added to this quotation in|Y
01|229947|3|2|the event of a sustained tariff increase on the|Y
01|229947|3|3|importation of this product.  Any surcharge will be|Y
01|229947|3|4|disclosed prior to acceptance of an order.|Y
01|229948|3|1|CONFIRMATION SWITCHES/BRACKET/COVER FOR PB-105-2W|Y
01|229948|4|1|D010-DACC-120 AIR COLLET CLOSER 120MM CE|Y
01|229948|4|2|5C collet closer Dunham cylinder with draw tube and|Y
01|229948|4|3|nose piece.|Y
01|229953|1|1|The balance of the nuts are stock in Japan. Lyndex|Y
01|229953|1|2|Nikken Air cutoff is 04/07 for ETA to L-N 04/18.|Y
01|229956|1|1|Please Note: This holder is Special once a purchase|Y
01|229956|1|2|order is placed it cannot be cancelled or returned.|Y
01|229956|8|1|A tariff surcharge may be added to this quotation in|Y
01|229956|8|2|the event of a sustained tariff increase on the|Y
01|229956|8|3|importation of this product.  Any surcharge will be|Y
01|229956|8|4|disclosed prior to acceptance of an order.|Y
01|229961|1|1|Final Part# HSK100A-PE-M10-137 **Quoted at NET Price**|Y
01|229961|1|2|HSK100A to M10 holder 137mm GL|Y
01|229961|1|3|5 Pc Minimum Order Quantity|Y
01|229961|1|4|QTY BREAK PRICING:|Y
01|229961|1|5|5 pcs: $182.00/ea|Y
01|229961|1|6|6+pcs: $172.00/ea|Y
01|229961|3|1|Final Part# HSK100A-PE-M10-179 **Quoted at NET price**|Y
01|229961|3|2|HSK100A to M10 holder 179mm Gauge Length|Y
01|229961|3|3|5 Pc Minimum Order Quantity|Y
01|229961|3|4|QTY BREAK PRICING:|Y
01|229961|3|5|5 pcs: $216/ea|Y
01|229961|3|6|6+pcs: $206/ea|Y
01|229972|1|1|RGA#TAR-61704|Y
01|229972|1|2|5AX-130BAYA-BR-QT|Y
01|229972|1|3|SN: 5532|Y
01|229979|1|1|RGA#LVR-61700/|Y
01|229979|1|2|Repair of MZMP47-ER32Z-ICE s/n: 83888 01 (Mim#124864)|Y
01|229979|2|1|Bearings seals o-rings and damaged input spindle to|Y
01|229979|2|2|be repalced.|Y
01|229979|4|1|RGA#LVR-61700/|Y
01|229979|4|2|Repair of MZMP47-ER32Z-ICE s/n: 95846 01 (Mim#124864)|Y
01|229979|5|1|Bearings seals o-rings damaged input and output|Y
01|229979|5|2|spindles to be replaced.|Y
01|229979|7|1|RGA#LVR-61700/|Y
01|229979|7|2|Repair of MZMP47-ER32Z-ICE s/n:20901701 07 (Mim#124864)|Y
01|229979|8|1|Bearings seals o-rings and damaged input spindle to|Y
01|229979|8|2|be replaced.|Y
01|229979|10|1|RGA#LVR-61700/|Y
01|229979|10|2|Repair of MZMP47-ER32X-OFF-C s/n: 18900016 03|Y
01|229979|10|3|(Mimatic# 124255)|Y
01|229979|11|1|Bearings seals and o-rings to be replaced.|Y
01|229985|1|1|Service call for Sethy six s/n: 5253|Y
01|229985|1|2|This is a time based estimate.|Y
01|229985|1|3|Any parts that would be required would be additional.|Y
01|229990|7|1|Machine flat onto the straight shank of K1.1/4-SK16-120|Y
01|229996|13|1|A tariff surcharge may be added to this quotation in|Y
01|229996|13|2|the event of a sustained tariff increase on the|Y
01|229996|13|3|importation of this product.  Any surcharge will be|Y
01|229996|13|4|disclosed prior to acceptance of an order.|Y
01|229999|2|1|LN to make block upon receipt of spindle specs.|Y
01|229999|5|1|LN to make block upon receipt of spindle specs.|Y
01|230007|8|1|A tariff surcharge may be added to this quotation in|Y
01|230007|8|2|the event of a sustained tariff increase on the|Y
01|230007|8|3|importation of this product.  Any surcharge will be|Y
01|230007|8|4|disclosed prior to acceptance of an order.|Y
01|230009|2|1|Installation includes: Dual axis drive unit short bar|Y
01|230009|2|2|fiber optic cable communications cable bulkhead cable|Y
01|230009|2|3|external cables parmeter changes service time and|Y
01|230009|2|4|travel.|Y
01|230015|1|1|NET Price for AHNSA|Y
01|230015|2|1|NCAT40-SF16-160CP|Y
01|230015|2|2|Net Price for AHNSA|Y
01|230018|3|1|Additional 20% discount applied to both items for our|Y
01|230018|3|2|Overstock Promotion.  Once a Purchase Order has been|Y
01|230018|3|3|received these items cannot be cancelled or returned.|Y
01|230018|5|1|This item is non-standard stock.  Once a Purchase Order|Y
01|230018|5|2|has been received this item cannot be cancelled or|Y
01|230018|5|3|returned.|Y
01|230023|1|1|Additional 20% Overstock Promo discount applied.|Y
01|230023|1|2|This item cannot be cancelled or returned.|Y
01|230023|2|1|Applicable to C5017-0180-6.00 only.|Y
01|230025|1|1|RGA#TAR-61706|Y
01|230025|1|2|TAT-170N|Y
01|230025|1|3|SN:45003|Y
01|230026|1|1|RGA#TAR-61706|Y
01|230026|1|2|TAT-170N|Y
01|230026|1|3|SN:42586B|Y
01|230028|1|1|AACT Check up & Oil change Service 1st/5(5yrs plan)|Y
01|230028|1|2|Please refer to MOU#: LN226426-01C|Y
01|230028|1|3|This service is scheduled for 8/30-9/1/2025 at AACT.|Y
01|230029|1|1|Part Number: TBD|Y
01|230029|1|2|BT40 EndMill Holder 20mm 3 gage length|Y
01|230048|1|1|Please Note: Net price includes price of|Y
01|230048|1|2|BIS-M-122-02/A.|Y
01|230048|2|1|Please Note: Net price includes the cost of chip|Y
01|230048|2|2|installation and etching of Pratt's # PT457340 REV-|Y
01|230048|2|3|on holder and packaging.|Y
01|230057|2|1|A tariff surcharge may be added to this quotation in|Y
01|230057|2|2|the event of a sustained tariff increase on the|Y
01|230057|2|3|importation of this product.  Any surcharge will be|Y
01|230057|2|4|disclosed prior to acceptance of an order.|Y
01|230073|16|1|WP-13|Y
01|230088|1|1|FOR DNM5700-II RIGHT SIDE MOUNT W/ MOTOR FACING REAR|Y
01|230088|1|2|OF OPERATOR TABLE. FANUC Oi-MF+ CONTROL|Y
01|230088|4|1|Required|Y
01|230091|4|1|Included with package Bill Approved|Y
01|230098|5|1|This item is non standard stockonce a purchase order|Y
01|230098|5|2|is placed it cannot be cancelled or returned.|Y
01|230099|5|1|H63A-SF0375-6.30|Y
01|230099|5|2|HSK63A Shrink Fit Holder 3/8 ChipHole 25K|Y
01|230099|6|1|H63A-SF0500-6.30|Y
01|230099|6|2|HSK63A Shrink Fit Holder 1/2 ChipHole 25K|Y
01|230102|2|1|A tariff surcharge may be added to this quotation in|Y
01|230102|2|2|the event of a sustained tariff increase on the|Y
01|230102|2|3|importation of this product.  Any surcharge will be|Y
01|230102|2|4|disclosed prior to acceptance of an order.|Y
01|230103|10|1|Custom Base Plate for WH-ZV-P160|Y
01|230104|9|1|A tariff surcharge may be added to this quotation in|Y
01|230104|9|2|the event of a sustained tariff increase on the|Y
01|230104|9|3|importation of this product.  Any surcharge will be|Y
01|230104|9|4|disclosed prior to acceptance of an order.|Y
01|230106|5|1|A tariff surcharge may be added to this quotation in|Y
01|230106|5|2|the event of a sustained tariff increase on the|Y
01|230106|5|3|importation of this product.  Any surcharge will be|Y
01|230106|5|4|disclosed prior to acceptance of an order.|Y
01|230107|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|230108|1|1|same as previous R.Table serial#1808.|Y
01|230108|1|3|6+1 RJ included|Y
01|230108|1|4|quoted as Net price|Y
01|230108|1|5|6 months for manufacturing upon approval drawing|Y
01|230108|1|6|After manufacturing it will be moved by Boat.|Y
01|230108|1|7|Inland freight (USA) is not included.|Y
01|230108|7|1|A tariff surcharge of 8% will be added to every order|Y
01|230108|7|2|placed after September 1st 2025(until further notice).|Y
01|230108|7|3|This surcharge will be acknowledged upon acceptance|Y
01|230108|7|4|of every order.|Y
01|230109|2|1|MORRIS Madness show special- needs to be quoted|Y
01|230109|2|2|3/26-3/28 and purchased by 60 days|Y
01|230113|2|1|1 currently in stock 10-12 weeks for quantity 14.|Y
01|230113|31|1|Please note additional 20% applied per overstock promo.|Y
01|230113|31|2|This item cannot be cancelled or returned upon receipt|Y
01|230113|31|3|of PO/order. Once stock is depleted these will need to|Y
01|230113|31|4|be requoted. 9 pieces currently in stock here in IL.|Y
01|230125|1|1|TNKQ2503-0971 0001 - please note this is considered|Y
01|230125|1|2|special...once PO/order issued this can't be cancelled|Y
01|230125|1|3|or returned.|Y
01|230150|2|1|Please note additional 20% applied per overstock promo.|Y
01|230150|2|2|This item cannot be cancelled or returned upon receipt|Y
01|230150|2|3|of PO/order. Once stock is depleted these will need to|Y
01|230150|2|4|be requoted.|Y
01|230154|6|1|Please note additional 20% applied per overstock promo.|Y
01|230154|6|2|This item cannot be cancelled or returned upon receipt|Y
01|230154|6|3|of PO/order. Once stock depleted these will need to be|Y
01|230154|6|4|requoted.|Y
01|230160|1|1|P/N: CAT50-C1.1/4-135UG-IDU Balanceable holder|Y
01|230161|1|1|P/N: MZQT5-ER40X-OFF|Y
01|230161|1|2|Mazak VDI50 Live ER40 X<Radial> STRT External Coolant|Y
01|230161|1|3|only|Y
01|230165|6|1|**NO SAFETY RECESS.  BODY MAY INTERFERE WITH ATC ARM**|Y
01|230168|1|1|match with SN#41642TC|Y
01|230168|1|2|includes the following accessories|Y
01|230168|1|3|TCE-A7026/9A cable|Y
01|230168|1|4|TCE-A94808/5 cable|Y
01|230168|1|5|TCD-A3515-R. 3+1PRJ|Y
01|230168|2|1|A tariff surcharge of 8% will be added to every order|Y
01|230168|2|2|placed after September 1st 2025(until further notice).|Y
01|230168|2|3|This surcharge will be acknowledged upon acceptance|Y
01|230168|2|4|of every order.|Y
01|230170|10|1|SKG-15|Y
01|230170|13|1|HSK63A-MDSK13-135|Y
01|230174|1|1|RGA#TOR-61603/|Y
01|230174|1|2|Repair of SF-START2-UNIT-200 s/n: 2J7059|Y
01|230188|1|1|1st Batch 3/26:DWG saved in Teams File and sent ENG.MF|Y
01|230191|1|1|special non-standard stock. Cannot be cancelled|Y
01|230191|1|2|or returned upon receipt of a PO.|Y
01|230200|1|1|RGA#TOR-61746/|Y
01|230200|1|2|Repair of SF-START2-UNIT-200 s/n: 2J0094|Y
01|230202|22|1|Installation includes: Dual axis drive unit short bar|Y
01|230202|22|2|fiber optic cable communications cables bulkhead|Y
01|230202|22|3|cables external cables parameter changes service|Y
01|230202|22|4|time and travel.|Y
01|230203|4|1|Option|Y
01|230203|5|1|Option|Y
01|230205|8|1|A tariff surcharge may be added to this quotation in|Y
01|230205|8|2|the event of a sustained tariff increase on the|Y
01|230205|8|3|importation of this product.  Any surcharge will be|Y
01|230205|8|4|disclosed prior to acceptance of an order.|Y
01|230206|1|1|Holders to be etched with Bombardier's #AV000103|Y
01|230208|7|1|A tariff surcharge may be added to this quotation in|Y
01|230208|7|2|the event of a sustained tariff increase on the|Y
01|230208|7|3|importation of this product.  Any surcharge will be|Y
01|230208|7|4|disclosed prior to acceptance of an order.|Y
01|230209|6|1|A tariff surcharge may be added to this quotation in|Y
01|230209|6|2|the event of a sustained tariff increase on the|Y
01|230209|6|3|importation of this product.  Any surcharge will be|Y
01|230209|6|4|disclosed prior to acceptance of an order.|Y
01|230217|16|1|WP-13|Y
01|230228|1|1|1st batch(w/IDU)>9/12/24:APRVD(TimR)|Y
01|230228|2|1|1st batch(w/IDU)>9/12/24:APRVD(TimR)|Y
01|230229|4|1|Please Note: The RT-Accessory part number can be used|Y
01|230229|4|2|on both CNC180MA-M & CNC202MA-M.|Y
01|230229|4|3|Quoted at NET price.|Y
01|230229|8|1|Quoted at NET price.|Y
01|230234|10|1|This is a non-standard stock item and considered|Y
01|230234|10|2|special. Once a PO has been issued it cannot be|Y
01|230234|10|3|cancelled or returned.|Y
01|230238|5|1|LOCAL TRAVEL|Y
01|230238|7|1|REQUIRES ALL ITEMS ABOVE WITH EXCEPTION OF LN#1|Y
01|230238|8|1|REQUIRES ALL ITEMS ABOVE WITH EXCEPTION OF LN#1|Y
01|230238|9|1|A tariff surcharge may be added to this quotation in|Y
01|230238|9|2|the event of a sustained tariff increase on the|Y
01|230238|9|3|importation of this product.  Any surcharge will be|Y
01|230238|9|4|disclosed prior to acceptance of an order.|Y
01|230239|4|1|Please Note: This wrench is not for the tool holder|Y
01|230239|4|2|quoted. Wrench for HSK63A-SK25C-135-IDU is 9HC22|Y
01|230239|4|3|in stock $41.00 list less 28%.|Y
01|230241|1|1|CAT50 to C4 adapter|Y
01|230242|1|1|Special price demo table without motors.|Y
01|230259|1|1|Had attitude...|N
01|230259|2|1|Corey appoligized... keep 30%|N
01|230277|2|1|A tariff surcharge may be added to this quotation in|Y
01|230277|2|2|the event of a sustained tariff increase on the|Y
01|230277|2|3|importation of this product.  Any surcharge will be|Y
01|230277|2|4|disclosed prior to acceptance of an order.|Y
01|230278|1|1|RGA#LVR-61648/|Y
01|230278|1|2|Repair of OKE4-ER40Z-ICE s/n: 24902635 01|Y
01|230278|1|3|(Mimatic#190233)|Y
01|230278|2|1|Bearings seals and o-rings to be replaced|Y
01|230280|1|1|Part # S.HSK63A-CLP-P|Y
01|230280|1|2|Pull Force Meter Set:Transducer/Load Cell/Adapter|Y
01|230280|1|3|HSK63A With Aluminum Case|Y
01|230280|2|1|HSK100A-CLP-BD  NIKKEN HSK100A adapter for pull force|Y
01|230280|2|2|meter.|Y
01|230280|3|1|9CLP-PAC-HSK63A-100A  Case to store both HSK63A pull|Y
01|230280|3|2|force meter set and HSK100A Adapter.|Y
01|230280|3|3|No Charge|Y
01|230295|1|1|HSK63A-C12-90G|Y
01|230295|4|1|HSK63A-C20-95G|Y
01|230295|7|1|A tariff surcharge may be added to this quotation in|Y
01|230295|7|2|the event of a sustained tariff increase on the|Y
01|230295|7|3|importation of this product.  Any surcharge will be|Y
01|230295|7|4|disclosed prior to acceptance of an order.|Y
01|230299|1|1|TNKQ2503-1062 0003|Y
01|230300|1|1|w/ PS-123-AIR installed at factory|Y
01|230300|2|1|Installed on NC5-46-SK6C-90 at factory|Y
01|230300|3|1|A tariff surcharge may be added to this quotation in|Y
01|230300|3|2|the event of a sustained tariff increase on the|Y
01|230300|3|3|importation of this product.  Any surcharge will be|Y
01|230300|3|4|disclosed prior to acceptance of an order.|Y
01|230303|5|1|A tariff surcharge may be added to this quotation in|Y
01|230303|5|2|the event of a sustained tariff increase on the|Y
01|230303|5|3|importation of this product.  Any surcharge will be|Y
01|230303|5|4|disclosed prior to acceptance of an order.|Y
01|230304|2|1|Parts#: RMSS-4.65|Y
01|230304|2|2|Carbide Radical Mill Reamer ST Shank (Recommended)|Y
01|230304|2|3|Drill Hole:4.45~4.5|Y
01|230304|2|4|Speed & Feed:25~30m/min 0.15mm/rev|Y
01|230304|2|5|MOQ 1-2: $252/EA|Y
01|230304|7|1|Parts#: NCS-4.65|Y
01|230304|7|2|HSS Reamer (NC Sensor Reamer)ST Shank|Y
01|230304|7|3|Drill Hole: 4.45~4.5|Y
01|230304|7|4|Speed & Feed: 10~15m/min 0.15-0.2mm/rev|Y
01|230304|7|5|MOQ 1-2: $162/EA|Y
01|230306|2|1|A tariff surcharge may be added to this quotation in|Y
01|230306|2|2|the event of a sustained tariff increase on the|Y
01|230306|2|3|importation of this product.  Any surcharge will be|Y
01|230306|2|4|disclosed prior to acceptance of an order.|Y
01|230307|1|1|Special Version for Haas VF4 Angle Head|Y
01|230307|2|1|A tariff surcharge may be added to this quotation in|Y
01|230307|2|2|the event of a sustained tariff increase on the|Y
01|230307|2|3|importation of this product.  Any surcharge will be|Y
01|230307|2|4|disclosed prior to acceptance of an order.|Y
01|230335|6|1|A tariff surcharge may be added to this quotation in|Y
01|230335|6|2|the event of a sustained tariff increase on the|Y
01|230335|6|3|importation of this product.  Any surcharge will be|Y
01|230335|6|4|disclosed prior to acceptance of an order.|Y
01|230343|9|1|A tariff surcharge may be added to this quotation in|Y
01|230343|9|2|the event of a sustained tariff increase on the|Y
01|230343|9|3|importation of this product.  Any surcharge will be|Y
01|230343|9|4|disclosed prior to acceptance of an order.|Y
01|230362|1|1|P/N: HSK63F-SK20C-120P|Y
01|230362|1|2|HSK63 F Taper SK20 coolant collet chuck hi-speed|Y
01|230362|1|3|120mm gauge length|Y
01|230363|19|1|Quoted at NET price.|Y
01|230366|1|1|BT50 blank bar 5.75 OD 13.00 gauge length|Y
01|230369|6|1|EXTERNAL POWER AND FEEDBACK CABLES|Y
01|230370|1|1|SPECIAL DISCOUNT - STANDARD IS 30%|Y
01|230375|7|1|HSK63A-MDSK20-105|Y
01|230376|4|1|A tariff surcharge may be added to this quotation in|Y
01|230376|4|2|the event of a sustained tariff increase on the|Y
01|230376|4|3|importation of this product.  Any surcharge will be|Y
01|230376|4|4|disclosed prior to acceptance of an order.|Y
01|230379|2|1|A tariff surcharge may be added to this quotation in|Y
01|230379|2|2|the event of a sustained tariff increase on the|Y
01|230379|2|3|importation of this product.  Any surcharge will be|Y
01|230379|2|4|disclosed prior to acceptance of an order.|Y
01|230384|1|1|Multi-Spindle Driven Tool Unit - Straight|Y
01|230384|1|2|Central Design|Y
01|230385|3|1|A tariff surcharge may be added to this quotation in|Y
01|230385|3|2|the event of a sustained tariff increase on the|Y
01|230385|3|3|importation of this product.  Any surcharge will be|Y
01|230385|3|4|disclosed prior to acceptance of an order.|Y
01|230396|5|1|A tariff surcharge may be added to this quotation in|Y
01|230396|5|2|the event of a sustained tariff increase on the|Y
01|230396|5|3|importation of this product.  Any surcharge will be|Y
01|230396|5|4|disclosed prior to acceptance of an order.|Y
01|230401|1|1|Service call for Hathor Six A  s/n:6309|Y
01|230401|1|2|This is a time based estimate.|Y
01|230401|1|3|Any parts that would be required would be additional.|Y
01|230408|1|1|Please Note: C40-4500 is now C40S-4500-EU.|Y
01|230412|1|1|Please Note: C40-4500 is now C40S-4500-EU.|Y
01|230421|2|1|A tariff surcharge may be added to this quotation in|Y
01|230421|2|2|the event of a sustained tariff increase on the|Y
01|230421|2|3|importation of this product.  Any surcharge will be|Y
01|230421|2|4|disclosed prior to acceptance of an order.|Y
01|230430|3|1|A tariff surcharge may be added to this quotation in|Y
01|230430|3|2|the event of a sustained tariff increase on the|Y
01|230430|3|3|importation of this product.  Any surcharge will be|Y
01|230430|3|4|disclosed prior to acceptance of an order.|Y
01|230436|1|1|match with SN#25532T|Y
01|230436|1|2|includes the following accessories|Y
01|230436|1|3|TCD-21193 (6+1PRJ)|Y
01|230436|1|4|TCE-A7026 (power signal cable)|Y
01|230436|1|5|TCE-94808 (feeg back cable)|Y
01|230444|7|1|Machine flat onto the straight shank of E25-EXT-125|Y
01|230445|1|1|This item is discontinued but I have 4 in stock.|Y
01|230445|2|1|Replacement for the HP-4. It is now rust and dust proof|Y
01|230448|1|1|**Quoted at NET price** Min Order QTY 20pcs|Y
01|230448|1|2|Please note this is special non-standard stock. Item|Y
01|230448|1|3|cannot be cancelled or returned upon receipt of PO.|Y
01|230448|1|4|.|Y
01|230448|1|5|Delivery: Please allow 1-2 weeks for design + 21-23|Y
01|230448|1|6|weeks for manufacturing/shipping. Requires approval|Y
01|230448|1|7|drawing to be signed by customer.|Y
01|230453|1|1|These have been quoted at a special net price.|Y
01|230453|1|2|Estimated 4-5 week delivery time please note these|Y
01|230453|1|3|are custom units & application must be approved.|Y
01|230453|1|4|Once a PO has been issued these cannot be cancelled|Y
01|230453|1|5|or returned.|Y
01|230460|1|1|RGA#TAR-61714|Y
01|230460|1|2|CNC260PFA-M SN: 1125C|Y
01|230462|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|230467|1|1|**discontinued item - cannot be cancelled or returned|Y
01|230467|1|2|upon receipt of PO**|Y
01|230467|1|3|Quoted at NET price.|Y
01|230468|1|1|Kennametal: 3860218 QTY6|Y
01|230468|2|1|Kennametal: 6694003 QTY6|Y
01|230468|3|1|Kennametal: 6694008 QTY2|Y
01|230468|4|1|Kennametal: 3860225 QTY6|Y
01|230468|5|1|Kennametal: 6694006 QTY6 & Kennametal: 3860226 QTY2|Y
01|230468|5|2|We do not make a 6 gage length.|Y
01|230468|6|1|Kennametal: 3860164 QTY3|Y
01|230468|7|1|Kennametal: 3860165 QTY3|Y
01|230468|8|1|Kennametal: 3860166 QTY3|Y
01|230468|9|1|Kennametal: 3860008 QTY3|Y
01|230468|10|1|Kennametal: 3860010 QTY3|Y
01|230468|11|1|Kennametal: 3860012 QTY3|Y
01|230468|12|1|Kennametal: 3860016 QTY3|Y
01|230468|13|1|Kennametal: 3860127 QTY2|Y
01|230468|14|1|Kennametal: 3860130 QTY2|Y
01|230468|15|1|Kennametal: 3870022 QTY2|Y
01|230468|16|1|Kennametal: 3870027 QTY2|Y
01|230468|17|1|Kennametal: 3870029 QTY2|Y
01|230468|19|1|Kennametal: 1135892 QTY1|Y
01|230468|20|1|Kennametal: 1135911 QTY1|Y
01|230468|21|1|Kennametal: 7195315 QTY2|Y
01|230468|22|1|Kennametal: 7195314 QTY2|Y
01|230472|2|1|A tariff surcharge may be added to this quotation in|Y
01|230472|2|2|the event of a sustained tariff increase on the|Y
01|230472|2|3|importation of this product.  Any surcharge will be|Y
01|230472|2|4|disclosed prior to acceptance of an order.|Y
01|230487|6|1|A tariff surcharge may be added to this quotation in|Y
01|230487|6|2|the event of a sustained tariff increase on the|Y
01|230487|6|3|importation of this product.  Any surcharge will be|Y
01|230487|6|4|disclosed prior to acceptance of an order.|Y
01|230489|6|1|A tariff surcharge may be added to this quotation in|Y
01|230489|6|2|the event of a sustained tariff increase on the|Y
01|230489|6|3|importation of this product.  Any surcharge will be|Y
01|230489|6|4|disclosed prior to acceptance of an order.|Y
01|230500|11|1|Please note this holder is modified with hi-speed|Y
01|230500|11|2|coolant nut (SKN-16BJ(GH)). Once an order has been|Y
01|230500|11|3|placed it cannot be cancelled or returned.|Y
01|230500|11|4|QUOTED AT NET PRICE.|Y
01|230511|1|1|RGA#TAR-61450|Y
01|230511|1|2|NCT200E SN: 1488C|Y
01|230515|4|1|A tariff surcharge may be added to this quotation in|Y
01|230515|4|2|the event of a sustained tariff increase on the|Y
01|230515|4|3|importation of this product.  Any surcharge will be|Y
01|230515|4|4|disclosed prior to acceptance of an order.|Y
01|230517|5|1|A tariff surcharge may be added to this quotation in|Y
01|230517|5|2|the event of a sustained tariff increase on the|Y
01|230517|5|3|importation of this product.  Any surcharge will be|Y
01|230517|5|4|disclosed prior to acceptance of an order.|Y
01|230528|1|1|RGA#TAR-61719|Y
01|230528|1|2|CNC321 SN:12995|Y
01|230531|1|1|RGA#TAR-61719|Y
01|230531|1|2|TAT-250 SN: 2129|Y
01|230532|2|1|A tariff surcharge may be added to this quotation in|Y
01|230532|2|2|the event of a sustained tariff increase on the|Y
01|230532|2|3|importation of this product.  Any surcharge will be|Y
01|230532|2|4|disclosed prior to acceptance of an order.|Y
01|230541|3|1|A tariff surcharge may be added to this quotation in|Y
01|230541|3|2|the event of a sustained tariff increase on the|Y
01|230541|3|3|importation of this product.  Any surcharge will be|Y
01|230541|3|4|disclosed prior to acceptance of an order.|Y
01|230546|2|1|A tariff surcharge may be added to this quotation in|Y
01|230546|2|2|the event of a sustained tariff increase on the|Y
01|230546|2|3|importation of this product.  Any surcharge will be|Y
01|230546|2|4|disclosed prior to acceptance of an order.|Y
01|230557|5|1|Spanner wrench for mill chuck|Y
01|230557|9|1|Spanner wrench for coolant caps|Y
01|230557|16|1|8k MAX RPM|Y
01|230557|17|1|ADDITIONAL 20% DISCOUNT ADDED PER OVERSTOCK PROMO|Y
01|230557|17|2|ITEM CANNOT BE RETURNED OR CANCELLED UPON RECIPT OF|Y
01|230557|17|3|ORDER. ONCE STOCK IS DEPLETED WE WILL NEED TO RE-QUOTE|Y
01|230560|19|1|A tariff surcharge may be added to this quotation in|Y
01|230560|19|2|the event of a sustained tariff increase on the|Y
01|230560|19|3|importation of this product.  Any surcharge will be|Y
01|230560|19|4|disclosed prior to acceptance of an order.|Y
01|230573|2|1|Quoted at Net Price|Y
01|230584|1|1|RGA#TAR-61780|Y
01|230584|1|2|5AX-N400FA-8+1PRJ SN:3103|Y
01|230584|3|1|FOR: 5AX-N400FA-8+1PRJ SN:3103|Y
01|230591|1|1|Final Part #TBD *quoted @ NET Price|Y
01|230591|1|2|A very special angle head HSK-100|Y
01|230591|1|3|Jenna says delivery is tbd if you are a nice person|Y
01|230598|50|1|A tariff surcharge may be added to this quotation in|Y
01|230598|50|2|the event of a sustained tariff increase on the|Y
01|230598|50|3|importation of this product.  Any surcharge will be|Y
01|230598|50|4|disclosed prior to acceptance of an order.|Y
01|230602|11|1|A tariff surcharge may be added to this quotation in|Y
01|230602|11|2|the event of a sustained tariff increase on the|Y
01|230602|11|3|importation of this product.  Any surcharge will be|Y
01|230602|11|4|disclosed prior to acceptance of an order.|Y
01|230606|2|1|Includes air lines and centering adapter|Y
01|230607|7|1|Overstocked.  Additional 10% off added -DanaS|Y
01|230607|7|2|Demo Unit available @ 40% off list. Not eligible for|Y
01|230607|7|3|any other promos or discounts.|Y
01|230613|2|1|A tariff surcharge of 8% will be added to every order|Y
01|230613|2|2|placed after September 1st 2025(until further notice).|Y
01|230613|2|3|This surcharge will be acknowledged upon acceptance|Y
01|230613|2|4|of every order.|Y
01|230625|6|1|A tariff surcharge may be added to this quotation in|Y
01|230625|6|2|the event of a sustained tariff increase on the|Y
01|230625|6|3|importation of this product.  Any surcharge will be|Y
01|230625|6|4|disclosed prior to acceptance of an order.|Y
01|230628|2|1|Please note this is special non-standard stock.|Y
01|230628|2|2|Cannot be cancelled or returned upon receipt of PO.|Y
01|230630|8|1|Machine flat onto the straight shank of K1.1/4-SK16-120|Y
01|230637|5|1|External cables|Y
01|230637|8|1|A tariff surcharge may be added to this quotation in|Y
01|230637|8|2|the event of a sustained tariff increase on the|Y
01|230637|8|3|importation of this product.  Any surcharge will be|Y
01|230637|8|4|disclosed prior to acceptance of an order.|Y
01|230638|5|1|A tariff surcharge may be added to this quotation in|Y
01|230638|5|2|the event of a sustained tariff increase on the|Y
01|230638|5|3|importation of this product.  Any surcharge will be|Y
01|230638|5|4|disclosed prior to acceptance of an order.|Y
01|230639|1|1|CNC201MA SN: 1400|Y
01|230639|1|2|TAR-60775|Y
01|230639|1|3|CHECKED MECHANICS OF THE ROTARY TABLE - OK|Y
01|230639|1|4|MECHANICAL BACKLASH AROUND 0.020|Y
01|230639|1|5|BRAKE TESTED -> WORKS OK|Y
01|230639|1|6|MOTOR CONNECTIONS SEEM DAMAGED - POSSIBLE MOTOR OR|Y
01|230639|1|7|WIRE HARNESS ISSUE.|Y
01|230639|3|1|REPAIR OF HA33NC-TS MOTOR|Y
01|230639|3|2|REPLACE BEARINGS ON AC MOTOR SIDE|Y
01|230639|3|3|ENCODER CONNECTOR WAS BAD REPLACING WITH NEW ENCODER|Y
01|230639|4|1|REPAIR/REPLACE WIRE HARNESS|Y
01|230640|4|1|A tariff surcharge may be added to this quotation in|Y
01|230640|4|2|the event of a sustained tariff increase on the|Y
01|230640|4|3|importation of this product.  Any surcharge will be|Y
01|230640|4|4|disclosed prior to acceptance of an order.|Y
01|230643|4|1|A tariff surcharge may be added to this quotation in|Y
01|230643|4|2|the event of a sustained tariff increase on the|Y
01|230643|4|3|importation of this product.  Any surcharge will be|Y
01|230643|4|4|disclosed prior to acceptance of an order.|Y
01|230645|5|1|A tariff surcharge may be added to this quotation in|Y
01|230645|5|2|the event of a sustained tariff increase on the|Y
01|230645|5|3|importation of this product.  Any surcharge will be|Y
01|230645|5|4|disclosed prior to acceptance of an order.|Y
01|230647|2|1|Riser to match 160MM Centerline|Y
01|230647|3|1|Includes: TableCablesServo AmpInstall|Y
01|230647|3|2|Travel & Labor included|Y
01|230647|3|3|Current Install Date Available : 4/21&4/22|Y
01|230656|4|1|FACEPLATE ADAPTER MODIFIED TO DIRECT|Y
01|230656|4|2|MOUNT TO CNC260FA-M. CENTER PILOT FLAT BACK TO A2-6|Y
01|230659|1|1|Includes Power and Feedback Cables from the Nikken|Y
01|230659|1|2|Table to the machine bulkhead|Y
01|230665|1|1|Delivery: 2 pcs expected in 1-2 weeks rest 6/1 ETA|Y
01|230665|4|1|A tariff surcharge may be added to this quotation in|Y
01|230665|4|2|the event of a sustained tariff increase on the|Y
01|230665|4|3|importation of this product.  Any surcharge will be|Y
01|230665|4|4|disclosed prior to acceptance of an order.|Y
01|230669|1|1|No inspection required.|Y
01|230669|2|1|No inspection required.|Y
01|230669|3|1|No inspection required.|Y
01|230669|4|1|No inspection required.|Y
01|230669|5|1|No inspection required.|Y
01|230669|7|1|No inspection required.|Y
01|230669|8|1|No inspection required.|Y
01|230669|9|1|No inspection required.|Y
01|230669|10|1|No inspection required.|Y
01|230679|1|1|P/N: HSK63F-ER25-7.00|Y
01|230680|16|1|A tariff surcharge may be added to this quotation in|Y
01|230680|16|2|the event of a sustained tariff increase on the|Y
01|230680|16|3|importation of this product.  Any surcharge will be|Y
01|230680|16|4|disclosed prior to acceptance of an order.|Y
01|230681|25|1|A tariff surcharge of 8% will be added to every order|Y
01|230681|25|2|placed after September 1st 2025(until further notice).|Y
01|230681|25|3|This surcharge will be acknowledged upon acceptance|Y
01|230681|25|4|of every order.|Y
01|230684|2|1|NBT50-SK16C-165|Y
01|230684|2|2|NBT50 DualContact Slim Chuck SK16|Y
01|230684|3|1|NBT50-MTA2-45|Y
01|230684|3|2|NBT50 DualContact Morse Taper 2|Y
01|230684|4|1|NBT50-Z16-135|Y
01|230684|4|2|NBT50 Z16 Tension/Compression Tap Holder|Y
01|230684|5|1|NBT50-Z38-175|Y
01|230684|5|2|NBT50 Z38 Tension/Compression Tap Holder|Y
01|230684|6|1|NBT50-C16-135|Y
01|230684|6|2|NBT50 Milling Chuck 16mm 6K|Y
01|230684|10|1|NBT50-C32-165|Y
01|230684|10|2|NBT50 DualContact Milling Chuck 32mm 8K|Y
01|230684|11|1|NBT50-C42-105|Y
01|230684|11|2|NBT50 Milling Chuck 42mm 6K|Y
01|230684|12|1|NBT50-C42-165|Y
01|230684|12|2|NBT50 Milling Chuck 42mm 6K|Y
01|230684|17|1|SK16-7A|Y
01|230684|17|2|SK16 Slim Chuck Collet 7mm On-Size|Y
01|230684|18|1|SK16-9A|Y
01|230684|18|2|SK16 Slim Chuck Collet 9mm On-Size|Y
01|230684|34|1|CCT25-19-330|Y
01|230684|34|2|19mm Diameter Center Drill|Y
01|230685|1|1|FOR DNM5700 W/ FANUC OI-MF+ CONTROL|Y
01|230686|2|1|Lyndex-Nikken to make positioning block upon receipt of|Y
01|230686|2|2|spindle drawing information. *Net price|Y
01|230686|3|1|A tariff surcharge of 8% will be added to every order|Y
01|230686|3|2|placed after September 1st 2025(until further notice).|Y
01|230686|3|3|This surcharge will be acknowledged upon acceptance|Y
01|230686|3|4|of every order.|Y
01|230694|2|1|A tariff surcharge may be added to this quotation in|Y
01|230694|2|2|the event of a sustained tariff increase on the|Y
01|230694|2|3|importation of this product.  Any surcharge will be|Y
01|230694|2|4|disclosed prior to acceptance of an order.|Y
01|230696|27|1|A tariff surcharge may be added to this quotation in|Y
01|230696|27|2|the event of a sustained tariff increase on the|Y
01|230696|27|3|importation of this product.  Any surcharge will be|Y
01|230696|27|4|disclosed prior to acceptance of an order.|Y
01|230697|4|1|A tariff surcharge may be added to this quotation in|Y
01|230697|4|2|the event of a sustained tariff increase on the|Y
01|230697|4|3|importation of this product.  Any surcharge will be|Y
01|230697|4|4|disclosed prior to acceptance of an order.|Y
01|230701|1|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|230701|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|230701|3|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|230701|4|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|230701|6|1|Req.INS/Install S3/4-16X11/16|Y
01|230701|7|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|230706|1|1|RGA#LVR-61773/|Y
01|230706|1|2|Repair of MNL12-ER40X-ICE-10K s/n:18902578 02|Y
01|230706|1|3|(Mimatic#187708)|Y
01|230706|2|1|Bearings seals and o-rings to be replaced.|Y
01|230706|4|1|RGA#LVR-61773/|Y
01|230706|4|2|Repair of MNL12-ER40X-ICE-10K s/n: 18902578 03|Y
01|230706|4|3|(Mimatic#187708)|Y
01|230706|5|1|Bearings seals and o-rings to be replaced.|Y
01|230709|1|1|Net price for DMG|Y
01|230709|1|2|Non returnable Non cancelable once PO is issued.|Y
01|230712|2|1|A tariff surcharge may be added to this quotation in|Y
01|230712|2|2|the event of a sustained tariff increase on the|Y
01|230712|2|3|importation of this product.  Any surcharge will be|Y
01|230712|2|4|disclosed prior to acceptance of an order.|Y
01|230723|2|1|INCLUDED INTO COST OF PRESETTER|Y
01|230723|5|1|FORM FROM MACHINE BUILDER REQUIRED|Y
01|230723|7|1|FIRST AVAILABLE INSTALL WEEK OF 04/28|Y
01|230724|2|1|INCLUDED INTO COST OF PRESETTER|Y
01|230724|5|1|FORM FROM MACHINE BUILDER REQUIRED|Y
01|230724|7|1|FIRST AVAILABLE INSTALL WEEK OF 04/28|Y
01|230732|1|1|Net price for Afilados Intertool|Y
01|230732|2|1|Net price for Afilados Intertool|Y
01|230732|3|1|NBT30-SF20-90CP|Y
01|230732|3|2|Net price for Afilados Intertool|Y
01|230732|4|1|NBT30-SF10-90CP|Y
01|230732|4|2|Net Price for Afilados Intertool|Y
01|230733|1|1|Part Number: NCAT50-RDC6-080|Y
01|230733|1|2|NCAT50 DualContact Reduction to Capto C6 GL=70|Y
01|230733|1|3|Screw Connection|Y
01|230733|1|4|*10 weeks is given as estimate will need to reconfirm|Y
01|230733|1|5|once PO is placed.|Y
01|230733|2|1|A tariff surcharge may be added to this quotation in|Y
01|230733|2|2|the event of a sustained tariff increase on the|Y
01|230733|2|3|importation of this product.  Any surcharge will be|Y
01|230733|2|4|disclosed prior to acceptance of an order.|Y
01|230737|1|1|Currently 13 in stock balance of 12 ETA is|Y
01|230737|1|2|mid/end of May 2025.|Y
01|230737|8|1|A tariff surcharge may be added to this quotation in|Y
01|230737|8|2|the event of a sustained tariff increase on the|Y
01|230737|8|3|importation of this product.  Any surcharge will be|Y
01|230737|8|4|disclosed prior to acceptance of an order.|Y
01|230738|3|1|Please note this is considered special. Once PO/order|Y
01|230738|3|2|has been placed this cannot be cancelled or returned.|Y
01|230738|4|1|Please note this is considered special. Once PO/order|Y
01|230738|4|2|has been placed this cannot be cancelled or returned.|Y
01|230749|1|1|FOR HITACHI VX-55 CAT50 VMC; M-CODE RQR'D; SERIAL|Y
01|230749|1|2|INTERFACE USING DPRNT SYNTAX|Y
01|230749|2|1|CABLE CONFIGURATION IS REAR EXIT PER CUSTOMER REQUEST|Y
01|230749|4|1|ELECTRICAL PACKAGE AND STARTUP ASSISTANCE FOR HYD.|Y
01|230749|4|2|PUMP AR21 CONTROLLER|Y
01|230749|4|3|ADD SERIAL ADAPTER OR ADVISE ON WHICH ONE IS NEEDED|Y
01|230749|4|4|DANA TO ASSIST EU WITH INSTALL WHICH IS THE REASON FOR|Y
01|230749|4|5|THIS CHARGE.|Y
01|230749|8|1|Joe Kalal GC|N
01|230756|4|1|HSK100A-MTA5-195|Y
01|230765|1|1|RGA#CUR-61765/|Y
01|230765|1|2|Repair of C40-MRAM-IC s/n:23907219 02 (Mimatic#162813)|Y
01|230765|2|1|Bearings seals o-rings and internal coolant seal|Y
01|230765|2|2|assembly to be replaced.|Y
01|230766|2|1|Chip & Installation on various Sandvik C6 turning tools|Y
01|230771|1|1|Includes Power&feedback cables from Nikken to Haas|Y
01|230771|1|2|Bulkhead|Y
01|230772|1|1|Includes Power&Feedback cables from Nikken to Haas|Y
01|230772|1|2|bulkhead|Y
01|230776|2|1|installation kit for an 0iMF Beta drive control|Y
01|230776|2|2|2-meter cable set cables for the drive interface cabl|Y
01|230776|2|3|from the drive through the bulkhead|Y
01|230776|2|4|and cables from the bulkhead to the table|Y
01|230778|16|1|I am not sure why he needs this CCKL20 it is a tiny|Y
01|230778|16|2|disc wrench for coolant nuts.|Y
01|230779|1|1|P/N: C6-SM1000-100CP|Y
01|230779|1|2|Same as above but with cutter mounted which is 2.00|Y
01|230779|1|3|tall. needed is 6.00 of clear length in front of the|Y
01|230779|1|4|flange.|Y
01|230779|1|5|see drawing provided.|Y
01|230784|2|1|A tariff surcharge may be added to this quotation in|Y
01|230784|2|2|the event of a sustained tariff increase on the|Y
01|230784|2|3|importation of this product.  Any surcharge will be|Y
01|230784|2|4|disclosed prior to acceptance of an order.|Y
01|230795|3|1|A tariff surcharge may be added to this quotation in|Y
01|230795|3|2|the event of a sustained tariff increase on the|Y
01|230795|3|3|importation of this product.  Any surcharge will be|Y
01|230795|3|4|disclosed prior to acceptance of an order.|Y
01|230800|14|1|A tariff surcharge may be added to this quotation in|Y
01|230800|14|2|the event of a sustained tariff increase on the|Y
01|230800|14|3|importation of this product.  Any surcharge will be|Y
01|230800|14|4|disclosed prior to acceptance of an order.|Y
01|230804|1|1|RGA#TAR-61770|Y
01|230804|1|2|CNCZ100-2W-120LMA|Y
01|230804|1|3|SN:9083|Y
01|230811|2|1|A tariff surcharge may be added to this quotation in|Y
01|230811|2|2|the event of a sustained tariff increase on the|Y
01|230811|2|3|importation of this product.  Any surcharge will be|Y
01|230811|2|4|disclosed prior to acceptance of an order.|Y
01|230813|1|1|RGA#TAR-61719|Y
01|230813|1|2|CNC321SN:13909|Y
01|230814|35|1|A tariff surcharge may be added to this quotation in|Y
01|230814|35|2|the event of a sustained tariff increase on the|Y
01|230814|35|3|importation of this product.  Any surcharge will be|Y
01|230814|35|4|disclosed prior to acceptance of an order.|Y
01|230815|1|1|RGA#TAR-61719|Y
01|230815|1|2|CNC321SN:13908|Y
01|230817|1|1|Special discount due to high inventory|Y
01|230817|1|2|additional 10% off|Y
01|230818|1|1|RGA#TAR-61719|Y
01|230818|1|2|CNC321SN:C4|Y
01|230825|2|1|Add flat to D32-NPU13|Y
01|230825|2|2|*Non-returnable/non-cancellable|Y
01|230828|1|1|This item is special on-standard stock. Cannot|Y
01|230828|1|2|be cancelled or returned upon receipt of PO.|Y
01|230833|5|1|Additional 20% discount applied for our Overstock|Y
01|230833|5|2|Promotion.  Once a Purchase Order has been received|Y
01|230833|5|3|this item cannot be cancelled or returned.|Y
01|230835|1|1|RGA#MOD-61819|Y
01|230835|1|2|B-Axis Cable Create New|Y
01|230837|2|1|LN to make positioning block upon receipt of spindle|Y
01|230837|2|2|drawing.|Y
01|230837|3|1|A tariff surcharge of 8% will be added to every order|Y
01|230837|3|2|placed after September 1st 2025(until further notice).|Y
01|230837|3|3|This surcharge will be acknowledged upon acceptance|Y
01|230837|3|4|of every order.|Y
01|230839|1|1|Discontinued Stock - cannot be cancelled or returned|Y
01|230839|1|2|upon receipt of order.|Y
01|230840|4|1|LN to make positioning block upon receipt of spindle|Y
01|230840|4|2|drawing information. *NET Price|Y
01|230846|5|1|A tariff surcharge may be added to this quotation in|Y
01|230846|5|2|the event of a sustained tariff increase on the|Y
01|230846|5|3|importation of this product.  Any surcharge will be|Y
01|230846|5|4|disclosed prior to acceptance of an order.|Y
01|230855|2|1|A tariff surcharge may be added to this quotation in|Y
01|230855|2|2|the event of a sustained tariff increase on the|Y
01|230855|2|3|importation of this product.  Any surcharge will be|Y
01|230855|2|4|disclosed prior to acceptance of an order.|Y
01|230857|1|1|Estimated lead time is mid/end May 2025.|Y
01|230860|2|1|60 MM Riser for CNC302YA-M|Y
01|230860|5|1|12 X 36.5 STALLION TRUNNION W/ 2 GRID PATTERN|Y
01|230860|5|2|1/2-13 THREAD W/ .501 LOCATOR BUSHING INCLUDED|Y
01|230860|5|3|No brake included with this design.|Y
01|230860|6|1|PACKAGE INCLUDES (1) 1 X 36 X 12 ALUMINUM TOOLING|Y
01|230860|6|2|PLATE. (6) SLS-16-.75 (6) SLR-16|Y
01|230861|2|1|Estimated lead time is 4~6 Weeks after receipt of an|Y
01|230861|2|2|order.|Y
01|230870|8|1|A tariff surcharge may be added to this quotation in|Y
01|230870|8|2|the event of a sustained tariff increase on the|Y
01|230870|8|3|importation of this product.  Any surcharge will be|Y
01|230870|8|4|disclosed prior to acceptance of an order.|Y
01|230874|6|1|A tariff surcharge may be added to this quotation in|Y
01|230874|6|2|the event of a sustained tariff increase on the|Y
01|230874|6|3|importation of this product.  Any surcharge will be|Y
01|230874|6|4|disclosed prior to acceptance of an order.|Y
01|230879|2|1|A tariff surcharge may be added to this quotation in|Y
01|230879|2|2|the event of a sustained tariff increase on the|Y
01|230879|2|3|importation of this product.  Any surcharge will be|Y
01|230879|2|4|disclosed prior to acceptance of an order.|Y
01|230886|1|1|TNKQ2504-0460 0008|Y
01|230887|4|1|Final Part# HSK100A-0750-8.00 *Quoted at NET price*|Y
01|230887|4|2|HSK100A End Mill Holder 3/4 ChipHole 25K 8 GL|Y
01|230887|4|3|*Custom special - cannot be cancelled or returned*|Y
01|230887|4|4|QTY BREAK NET PRICING:|Y
01|230887|4|5|2pc: $1008.00ea/net - 8 WEEKS AFTER APPROVAL DRAWING|Y
01|230887|4|6|5pc+: $738.00ea/net - 20 WEEKS AFTER APPROVAL DRAWING|Y
01|230887|14|1|Final Part# HSK100A-2000-5.37 *NET Price quoted**|Y
01|230887|14|2|HSK100A End Mill Holder 2 ChipHole 20K|Y
01|230887|14|3|**Custom special - cannot be cancelled or returned**|Y
01|230887|14|4|QTY BREAK NET PRICING:|Y
01|230887|14|5|1pc: $1117.00ea/net - 8 WEEKS AFTER APPROVAL DRAWING|Y
01|230887|14|6|5pc+: $650.00ea/net -  20 WEEKS AFTER APPROVAL DRAWING|Y
01|230887|16|1|A tariff surcharge may be added to this quotation in|Y
01|230887|16|2|the event of a sustained tariff increase on the|Y
01|230887|16|3|importation of this product.  Any surcharge will be|Y
01|230887|16|4|disclosed prior to acceptance of an order.|Y
01|230890|3|1|We do not have any stock.  Estimated lead time for|Y
01|230890|3|2|the holders is end of May/mid June 2025.|Y
01|230894|4|1|A tariff surcharge may be added to this quotation in|Y
01|230894|4|2|the event of a sustained tariff increase on the|Y
01|230894|4|3|importation of this product.  Any surcharge will be|Y
01|230894|4|4|disclosed prior to acceptance of an order.|Y
01|230898|1|1|Tool 179152|Y
01|230899|4|1|A tariff surcharge of 8% will be added to every order|Y
01|230899|4|2|placed after September 1st 2025(until further notice).|Y
01|230899|4|3|This surcharge will be acknowledged upon acceptance|Y
01|230899|4|4|of every order.|Y
01|230917|3|1|A tariff surcharge may be added to this quotation in|Y
01|230917|3|2|the event of a sustained tariff increase on the|Y
01|230917|3|3|importation of this product.  Any surcharge will be|Y
01|230917|3|4|disclosed prior to acceptance of an order.|Y
01|230920|1|1|Installed with PS-868 at the factory|Y
01|230920|1|2|Quoted as NET pricing non-returnablenon-cancellable|Y
01|230923|4|1|1800MM (70.8) 3-JAW VTL SCROLL CHUCK WITH RECESS|Y
01|230923|4|2|EXTRA LONG MASTER JAWS AND COVER PLATE FOR VERTICAL APP|Y
01|230931|1|1|TOOLING CERTIFICATE FACE VALUE OF $15000.00.|Y
01|230931|1|2|REDEEMABLE FOR STOCK TOOLING AND ACCESSORIES|Y
01|230931|1|3|NO CASH VALUE|Y
01|230938|1|1|Honoring past orders of 12x HSK63A-MMC8C-107-AT-IDU|Y
01|230938|1|2|on quantity break pricing for Service Steel. Quote|Y
01|230938|1|3|reflects purchase of all 12 pieces.|Y
01|230940|5|1|Please Note: Discount for NC50S6-2000-3.63 has an extra|Y
01|230940|5|2|20% added to your discount for our Overstock promo.|Y
01|230940|5|3|This tool is non-returnable. Thank you!|Y
01|230953|2|1|A tariff surcharge may be added to this quotation in|Y
01|230953|2|2|the event of a sustained tariff increase on the|Y
01|230953|2|3|importation of this product.  Any surcharge will be|Y
01|230953|2|4|disclosed prior to acceptance of an order.|Y
01|230956|1|1|H80F-SM22-2.362 HSK80F Shell Mill Holder 22mm|Y
01|230956|1|2|With Drive Pins Pre-Balanced & Balancing Holes 30K|Y
01|230964|2|1|Adapter plate|Y
01|230964|5|1|Includes hoses solenoid and pressure switch|Y
01|230964|6|1|A tariff surcharge of 8% will be added to every order|Y
01|230964|6|2|placed after September 1st 2025(until further notice).|Y
01|230964|6|3|This surcharge will be acknowledged upon acceptance|Y
01|230964|6|4|of every order.|Y
01|230975|3|1|P/N: NBT50-C1-115|Y
01|230975|3|2|BT50 Dual Contact 1 milling chuck w/ 115mm g.l (4.53)|Y
01|230975|4|1|P/N: NBT50-C2-115|Y
01|230975|4|2|BT50 Dual Contact 2 milling chuck w/ 115mm g.l.(4.53)|Y
01|230975|5|1|A tariff surcharge of 8% will be added to every order|Y
01|230975|5|2|placed after September 1st 2025(until further notice).|Y
01|230975|5|3|This surcharge will be acknowledged upon acceptance|Y
01|230975|5|4|of every order.|Y
01|230980|6|1|A tariff surcharge may be added to this quotation in|Y
01|230980|6|2|the event of a sustained tariff increase on the|Y
01|230980|6|3|importation of this product.  Any surcharge will be|Y
01|230980|6|4|disclosed prior to acceptance of an order.|Y
01|230984|1|1|RGA#TAR-61719|Y
01|230984|1|2|TAT-250 SN: 4340|Y
01|230985|1|1|RGA#TAR-61719|Y
01|230985|1|2|TAT-250 SN: 3984|Y
01|230987|1|1|RGA#TAR-61719|Y
01|230987|1|2|TAT-250 SN: 4341|Y
01|230988|1|1|RGA#TAR-61719|Y
01|230988|1|2|TAT-250 SN: T6|Y
01|230995|2|1|Please Note: Extra 20% has been added to the discount.|Y
01|230995|2|2|This item is non-returnable.|Y
01|231000|5|1|A tariff surcharge of 8% will be added to every order|Y
01|231000|5|2|placed after September 1st 2025(until further notice).|Y
01|231000|5|3|This surcharge will be acknowledged upon acceptance|Y
01|231000|5|4|of every order.|Y
01|231002|2|1|Will include coolant ports|Y
01|231002|3|1|Will include coolant ports|Y
01|231002|4|1|Will include coolant ports.|Y
01|231004|9|1|A tariff surcharge may be added to this quotation in|Y
01|231004|9|2|the event of a sustained tariff increase on the|Y
01|231004|9|3|importation of this product.  Any surcharge will be|Y
01|231004|9|4|disclosed prior to acceptance of an order.|Y
01|231013|2|1|A tariff surcharge may be added to this quotation in|Y
01|231013|2|2|the event of a sustained tariff increase on the|Y
01|231013|2|3|importation of this product.  Any surcharge will be|Y
01|231013|2|4|disclosed prior to acceptance of an order.|Y
01|231017|4|1|A tariff surcharge may be added to this quotation in|Y
01|231017|4|2|the event of a sustained tariff increase on the|Y
01|231017|4|3|importation of this product.  Any surcharge will be|Y
01|231017|4|4|disclosed prior to acceptance of an order.|Y
01|231021|2|1|A tariff surcharge may be added to this quotation in|Y
01|231021|2|2|the event of a sustained tariff increase on the|Y
01|231021|2|3|importation of this product.  Any surcharge will be|Y
01|231021|2|4|disclosed prior to acceptance of an order.|Y
01|231043|1|1|Includes air/hyd booster|Y
01|231043|1|2|Includes $2500.00 core buy back promo|Y
01|231043|1|3|Replacement table for serial #13908|Y
01|231043|2|1|Replacement for serial #4366|Y
01|231045|1|1|Delivery:|Y
01|231045|1|2|1 pc: 4-5 Weeks|Y
01|231045|1|3|2-3 pcs: 8-10 Weeks|Y
01|231045|1|4|*Special quoted at NET price. Please see below|Y
01|231045|4|1|A tariff surcharge of 8% will be added to every order|Y
01|231045|4|2|placed after September 1st 2025(until further notice).|Y
01|231045|4|3|This surcharge will be acknowledged upon acceptance|Y
01|231045|4|4|of every order.|Y
01|231046|1|1|FOR CUSTOMER REQUEST BY TECHNICAL EQUIPMENT TO|Y
01|231046|1|2|SEEK LOWER COST OPTION.|Y
01|231046|1|3|SALES ENG: SCOTT SADOWSKY|Y
01|231046|1|4|MAKINO A71NX|Y
01|231046|3|1|8 PORT ROTARY UNION MODIFICATION FOR INCREASED|Y
01|231046|3|2|WORKING PRESSURE FROM 1500psi > 3000psi|Y
01|231046|3|3|FLUSH MOUNT REAR RADIAL ENTRY.  PRINTS TO FOLLOW|Y
01|231049|2|1|INCLUDED INTO COST OF PRESETTER|Y
01|231049|5|1|FORM FROM MACHINE BUILDER REQUIRED|Y
01|231049|7|1|FIRST AVAILABLE INSTALL WEEK OF 04/28|Y
01|231050|2|1|Placeholder for NBT40-SK13C-120.|Y
01|231050|8|1|Placeholder for NBT40-SK13C-120...|Y
01|231050|8|2|please note factory is not offering NBT40-SK13-120...|Y
01|231050|39|1|Placeholder for NBT40-SK13C-120.|Y
01|231051|2|1|A tariff surcharge may be added to this quotation in|Y
01|231051|2|2|the event of a sustained tariff increase on the|Y
01|231051|2|3|importation of this product.  Any surcharge will be|Y
01|231051|2|4|disclosed prior to acceptance of an order.|Y
01|231056|1|1|FOR MATSUURA VX-1000 VMC W/ FANUC CONTROL|Y
01|231056|1|2|4 PORT ROTARY JOINT TO SUPPORT 3RD PARTY PNEUMATIC|Y
01|231056|1|3|WORK HOLDING.|Y
01|231057|1|1|L-N #C6-PCLNL-45165-12CP|Y
01|231057|1|2|This item is non standard stock and is non-returnable.|Y
01|231057|17|1|If you are holding 6.2 please see below collet SK10-6.5|N
01|231057|17|2|which will hold 6.2mm and we have in stock.|N
01|231062|4|1|Discount applies if purchased with holder|Y
01|231062|5|1|Discount applies if purchased with holder|Y
01|231067|2|1|Quoted at NET price.|Y
01|231067|3|1|A tariff surcharge may be added to this quotation in|Y
01|231067|3|2|the event of a sustained tariff increase on the|Y
01|231067|3|3|importation of this product.  Any surcharge will be|Y
01|231067|3|4|disclosed prior to acceptance of an order.|Y
01|231068|3|1|*** This shrink fit holder is with 2 non-pluggable|Y
01|231068|3|2|coolant ports.|Y
01|231073|1|1|P/N: TBD|Y
01|231073|1|2|CAT50 Adjustable Angle Head Gear Ratio 1:2.25|Y
01|231073|1|3|Max Output RPM 13500 110 mm Pitch Internal Coolant|Y
01|231073|2|1|P/N: TBD|Y
01|231073|2|2|CAT50 Adjustable Angle Head Gear Ratio 1:2.25|Y
01|231073|2|3|Max Output RPM 13500 110mm Pitch No Coolant|Y
01|231073|3|1|A tariff surcharge may be added to this quotation in|Y
01|231073|3|2|the event of a sustained tariff increase on the|Y
01|231073|3|3|importation of this product.  Any surcharge will be|Y
01|231073|3|4|disclosed prior to acceptance of an order.|Y
01|231078|1|1|*Quoted at NET price|Y
01|231079|10|1|Please contact Lyndex-Nikken if your customer decides|Y
01|231079|10|2|to return.|Y
01|231079|11|1|A tariff surcharge may be added to this quotation in|Y
01|231079|11|2|the event of a sustained tariff increase on the|Y
01|231079|11|3|importation of this product.  Any surcharge will be|Y
01|231079|11|4|disclosed prior to acceptance of an order.|Y
01|231084|3|1|A tariff surcharge may be added to this quotation in|Y
01|231084|3|2|the event of a sustained tariff increase on the|Y
01|231084|3|3|importation of this product.  Any surcharge will be|Y
01|231084|3|4|disclosed prior to acceptance of an order.|Y
01|231091|1|1|HSK63A-SK25-90P-J|Y
01|231091|1|2|HSK63A Slim Chuck SK25 JetSlotNut HiSpeed 25K|Y
01|231091|2|1|HSK63A-SK20-105P-J|Y
01|231091|2|2|HSK63A Slim Chuck SK20 JetSlotNut HiSpeed 25K|Y
01|231091|3|1|HSK63A-MDSK20-105P-J|Y
01|231091|3|2|HSK63A Major Dream Slim Chuck SK20 HiSpeed 25K|Y
01|231098|2|1|A tariff surcharge may be added to this quotation in|Y
01|231098|2|2|the event of a sustained tariff increase on the|Y
01|231098|2|3|importation of this product.  Any surcharge will be|Y
01|231098|2|4|disclosed prior to acceptance of an order.|Y
01|231099|2|1|A tariff surcharge may be added to this quotation in|Y
01|231099|2|2|the event of a sustained tariff increase on the|Y
01|231099|2|3|importation of this product.  Any surcharge will be|Y
01|231099|2|4|disclosed prior to acceptance of an order.|Y
01|231100|2|1|A tariff surcharge of 8% will be added to every order|Y
01|231100|2|2|placed after September 1st 2025(until further notice).|Y
01|231100|2|3|This surcharge will be acknowledged upon acceptance|Y
01|231100|2|4|of every order.|Y
01|231102|1|1|RGA#LVR-61800/|Y
01|231102|1|2|Repair of MNL12-ER25Y-MD s/n:Unknow (Alps#MSA01-6J000)|Y
01|231102|2|1|Bearings o-rings collet nuts drive shaft and gears|Y
01|231102|2|2|to be replaced.|Y
01|231105|1|1|RGA#TAR-61719|Y
01|231105|1|2|CNC321SN:13908|Y
01|231106|3|1|Includes solenoid pressure switch and required|Y
01|231106|3|2|plumbing|Y
01|231106|4|1|Installation inlcudes: Drive unit cable managment|Y
01|231106|4|2|ladder modifications and cable set.|Y
01|231109|1|1|RGA#TAR-61719|Y
01|231109|1|2|CNC321SN:13908|Y
01|231116|18|1|Quoted at NET Price|Y
01|231120|7|1|A tariff surcharge may be added to this quotation in|Y
01|231120|7|2|the event of a sustained tariff increase on the|Y
01|231120|7|3|importation of this product.  Any surcharge will be|Y
01|231120|7|4|disclosed prior to acceptance of an order.|Y
01|231129|1|1|Haas motor and cable set to be provided by Champions|Y
01|231129|3|1|A tariff surcharge of 8% will be added to every order|Y
01|231129|3|2|placed after September 1st 2025(until further notice).|Y
01|231129|3|3|This surcharge will be acknowledged upon acceptance|Y
01|231129|3|4|of every order.|Y
01|231130|1|1|Tariff Code: 8466.10.0175 / Country of Origin Croatia|Y
01|231130|2|1|Tariff Code: 8466.10.0175 / Country of Origin Croatia|Y
01|231130|4|1|Tariff Code: 8466.10.0175 / Country Origin: Croatia|Y
01|231130|5|1|Tariff Code: 8466.10.0175 / Country Origin: Croatia|Y
01|231130|6|1|Tariff Code: 8466.10.0175 / Country Origin: Croatia|Y
01|231130|7|1|Tariff Code: 8466.10.0175 / Country Origin: Croatia|Y
01|231132|2|1|Net price includes the following parts for assembly|Y
01|231132|2|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|231132|2|3|customer's supplied RFID chip and holder re-balanced.|Y
01|231136|2|1|OVERSTOCK Discount|Y
01|231136|5|1|Only available in External Coolant|Y
01|231136|5|2|OVERSTOCK Discount|Y
01|231139|1|1|Delv 12pcs stock and 2pcs 2 weeks ba|Y
01|231146|6|1|A tariff surcharge may be added to this quotation in|Y
01|231146|6|2|the event of a sustained tariff increase on the|Y
01|231146|6|3|importation of this product.  Any surcharge will be|Y
01|231146|6|4|disclosed prior to acceptance of an order.|Y
01|231154|1|1|CAT40U-MOC1.1/4-170|Y
01|231154|1|2|CAT40 CoolantInducer/Fluid Head Milling Chuck 1.1/4|Y
01|231154|1|3|Quoted at NET price|Y
01|231155|10|1|A tariff surcharge may be added to this quotation in|Y
01|231155|10|2|the event of a sustained tariff increase on the|Y
01|231155|10|3|importation of this product.  Any surcharge will be|Y
01|231155|10|4|disclosed prior to acceptance of an order.|Y
01|231157|2|1|A tariff surcharge may be added to this quotation in|Y
01|231157|2|2|the event of a sustained tariff increase on the|Y
01|231157|2|3|importation of this product.  Any surcharge will be|Y
01|231157|2|4|disclosed prior to acceptance of an order.|Y
01|231158|2|1|SKJ6-1.75|Y
01|231158|2|2|SK6 Coolant Cap 1.75mm Jet Slots|Y
01|231158|2|3|*NET Price considered a special.|Y
01|231163|1|1|RGA#TAR-61764|Y
01|231163|1|2|5AX-350FA-RCN2-RJ6 SN:3559|Y
01|231163|3|1|Tilt Side|Y
01|231163|28|1|Rotary Side|Y
01|231166|1|1|RGA#TAR-61788|Y
01|231166|1|2|5AX-2002FA-M SN: 1526|Y
01|231166|39|1|A tariff surcharge may be added to this quotation in|Y
01|231166|39|2|the event of a sustained tariff increase on the|Y
01|231166|39|3|importation of this product.  Any surcharge will be|Y
01|231166|39|4|disclosed prior to acceptance of an order.|Y
01|231167|2|1|A tariff surcharge may be added to this quotation in|Y
01|231167|2|2|the event of a sustained tariff increase on the|Y
01|231167|2|3|importation of this product.  Any surcharge will be|Y
01|231167|2|4|disclosed prior to acceptance of an order.|Y
01|231182|1|1|Final Part# TBD **Quoted at NET price**|Y
01|231182|1|2|HSK63A 80mmFLG 100mm Dia x 205mm Blank Bar|Y
01|231182|1|3|.|Y
01|231182|1|4|QTY BREAK NET PRICING:|Y
01|231182|1|5|12-17pcs - $387.00/ea|Y
01|231182|1|6|18-23pcs - $365.00/ea|Y
01|231182|1|7|24+  pcs - $314.00/ea|Y
01|231182|1|8|.|Y
01|231182|1|9|DELIVERY: 1-2 wks design time plus 10wks mfg/shipping|Y
01|231182|1|10|after receipt of signed approval drawing|Y
01|231182|2|1|A tariff surcharge may be added to this quotation in|Y
01|231182|2|2|the event of a sustained tariff increase on the|Y
01|231182|2|3|importation of this product.  Any surcharge will be|Y
01|231182|2|4|disclosed prior to acceptance of an order.|Y
01|231187|9|1|A tariff surcharge may be added to this quotation in|Y
01|231187|9|2|the event of a sustained tariff increase on the|Y
01|231187|9|3|importation of this product.  Any surcharge will be|Y
01|231187|9|4|disclosed prior to acceptance of an order.|Y
01|231188|8|1|A tariff surcharge may be added to this quotation in|Y
01|231188|8|2|the event of a sustained tariff increase on the|Y
01|231188|8|3|importation of this product.  Any surcharge will be|Y
01|231188|8|4|disclosed prior to acceptance of an order.|Y
01|231190|8|1|A tariff surcharge may be added to this quotation in|Y
01|231190|8|2|the event of a sustained tariff increase on the|Y
01|231190|8|3|importation of this product.  Any surcharge will be|Y
01|231190|8|4|disclosed prior to acceptance of an order.|Y
01|231191|8|1|A tariff surcharge may be added to this quotation in|Y
01|231191|8|2|the event of a sustained tariff increase on the|Y
01|231191|8|3|importation of this product.  Any surcharge will be|Y
01|231191|8|4|disclosed prior to acceptance of an order.|Y
01|231194|13|1|A tariff surcharge may be added to this quotation in|Y
01|231194|13|2|the event of a sustained tariff increase on the|Y
01|231194|13|3|importation of this product.  Any surcharge will be|Y
01|231194|13|4|disclosed prior to acceptance of an order.|Y
01|231196|4|1|FOR SV-40P S#MLB5353 DATE: JULY-2005|Y
01|231196|4|2|*LN to make positioning block upon receipt of spindle|Y
01|231196|4|3|drawings. Estimate 1 week once we get that information.|Y
01|231196|5|1|TRAVEL AND LABOR TO ASSIST WITH INSTALLATION OF|Y
01|231196|5|2|STOP BLOCK ON EXISTING JOHNFORD VMC.|Y
01|231196|6|1|A tariff surcharge may be added to this quotation in|Y
01|231196|6|2|the event of a sustained tariff increase on the|Y
01|231196|6|3|importation of this product.  Any surcharge will be|Y
01|231196|6|4|disclosed prior to acceptance of an order.|Y
01|231198|7|1|CUSTOM MT3 LIVE CENTER W/ 7 BULL HEAD ADAPTER|Y
01|231198|7|2|RITEN 51403 + 01675|N
01|231198|7|3|51403 =$954|N
01|231198|7|4|01675 =$994|N
01|231201|1|1|Final Part# TBD **Quoted at NET**|Y
01|231201|1|2|[Description]|Y
01|231201|1|3|*Cannot be cancelled or returned*|Y
01|231202|5|1|Only have 2.25 Gage Length for the 3/4 EMH|Y
01|231202|6|1|Only have 2.69 Gage Length for the 1 EMH|Y
01|231202|7|1|Only have 3.62 Gage Length for the 1.1/4 EMH|Y
01|231204|2|1|i need more practice|Y
01|231211|1|1|NBT40-SK6C-60-GJ|Y
01|231211|1|2|NBT40 DualContact Slim Chuck SK6 GroundJetSlotNut|Y
01|231211|1|3|HiSpeed 15K|Y
01|231211|1|4|Delivery: 1 pc 2 Weeks Addtl: 4-5 Weeks|Y
01|231211|2|1|A tariff surcharge may be added to this quotation in|Y
01|231211|2|2|the event of a sustained tariff increase on the|Y
01|231211|2|3|importation of this product.  Any surcharge will be|Y
01|231211|2|4|disclosed prior to acceptance of an order.|Y
01|231215|4|1|A tariff surcharge may be added to this quotation in|Y
01|231215|4|2|the event of a sustained tariff increase on the|Y
01|231215|4|3|importation of this product.  Any surcharge will be|Y
01|231215|4|4|disclosed prior to acceptance of an order.|Y
01|231219|2|1|A tariff surcharge may be added to this quotation in|Y
01|231219|2|2|the event of a sustained tariff increase on the|Y
01|231219|2|3|importation of this product.  Any surcharge will be|Y
01|231219|2|4|disclosed prior to acceptance of an order.|Y
01|231225|9|1|A tariff surcharge may be added to this quotation in|Y
01|231225|9|2|the event of a sustained tariff increase on the|Y
01|231225|9|3|importation of this product.  Any surcharge will be|Y
01|231225|9|4|disclosed prior to acceptance of an order.|Y
01|231230|1|1|Brake Repair CNCZ180LSA3 SN: 12271|Y
01|231239|3|1|A tariff surcharge may be added to this quotation in|Y
01|231239|3|2|the event of a sustained tariff increase on the|Y
01|231239|3|3|importation of this product.  Any surcharge will be|Y
01|231239|3|4|disclosed prior to acceptance of an order.|Y
01|231261|8|1|A tariff surcharge may be added to this quotation in|Y
01|231261|8|2|the event of a sustained tariff increase on the|Y
01|231261|8|3|importation of this product.  Any surcharge will be|Y
01|231261|8|4|disclosed prior to acceptance of an order.|Y
01|231265|2|1|A tariff surcharge may be added to this quotation in|Y
01|231265|2|2|the event of a sustained tariff increase on the|Y
01|231265|2|3|importation of this product.  Any surcharge will be|Y
01|231265|2|4|disclosed prior to acceptance of an order.|Y
01|231281|1|1|FOR HAAS VF3 VMC  SIGMA 7 MOTORS AND CABLES TO BE|Y
01|231281|1|2|SUPPLIED BY DEALER. INSTALLATION IS OPTIONAL|Y
01|231288|4|1|FOR SV-40P S#MLB5353 DATE: JULY-2005|Y
01|231288|4|2|Only 1 required|Y
01|231293|1|1|1st Batch /Interlakes Bases(MI)|Y
01|231294|1|1|A tariff surcharge may be added to this quotation in th|N
01|231294|2|1|A tariff surcharge may be added to this quotation in|Y
01|231294|2|2|the event of a sustained tariff increase on the|Y
01|231294|2|3|importation of this product.  Any surcharge will be|Y
01|231294|2|4|disclosed prior to acceptance of an order.|Y
01|231297|2|1|A tariff surcharge may be added to this quotation in|Y
01|231297|2|2|the event of a sustained tariff increase on the|Y
01|231297|2|3|importation of this product.  Any surcharge will be|Y
01|231297|2|4|disclosed prior to acceptance of an order.|Y
01|231300|1|1|P/N: CAT50-C3/4-135UG-IDU-M|Y
01|231300|1|2|CAT50 3/4 hi-speed milling chuck DIN modified|Y
01|231300|2|1|P/N: CAT50-SK6-165UP-IDU-M|Y
01|231300|2|2|CAT50 SK6 hi-speed slim chuck DIN modified|Y
01|231303|15|1|Please note coolant option not offered on stock collet.|Y
01|231303|21|1|Please note these are the last 2 remaining on shelf...|Y
01|231303|21|2|pricing and delivery will need to be reconfirmed once|Y
01|231303|21|3|stock is depleted.|Y
01|231305|2|1|A tariff surcharge may be added to this quotation in|Y
01|231305|2|2|the event of a sustained tariff increase on the|Y
01|231305|2|3|importation of this product.  Any surcharge will be|Y
01|231305|2|4|disclosed prior to acceptance of an order.|Y
01|231306|2|1|A tariff surcharge may be added to this quotation in|Y
01|231306|2|2|the event of a sustained tariff increase on the|Y
01|231306|2|3|importation of this product.  Any surcharge will be|Y
01|231306|2|4|disclosed prior to acceptance of an order.|Y
01|231314|3|1|Currently one (1) in stock at the factory. Lead time is|Y
01|231314|3|2|2~3 Weeks after receipt of an order.  After that ETA|Y
01|231314|3|3|would approximately be mid/end June.|Y
01|231315|9|1|A tariff surcharge may be added to this quotation in|Y
01|231315|9|2|the event of a sustained tariff increase on the|Y
01|231315|9|3|importation of this product.  Any surcharge will be|Y
01|231315|9|4|disclosed prior to acceptance of an order.|Y
01|231317|3|1|A tariff surcharge may be added to this quotation in|Y
01|231317|3|2|the event of a sustained tariff increase on the|Y
01|231317|3|3|importation of this product.  Any surcharge will be|Y
01|231317|3|4|disclosed prior to acceptance of an order.|Y
01|231319|3|1|A tariff surcharge may be added to this quotation in|Y
01|231319|3|2|the event of a sustained tariff increase on the|Y
01|231319|3|3|importation of this product.  Any surcharge will be|Y
01|231319|3|4|disclosed prior to acceptance of an order.|Y
01|231320|1|1|Fanuc Motor Part#: A06B-0116-B855#0048|Y
01|231320|1|2|Description: BETA ISR 1/6000 MTR W/BRAKE|Y
01|231326|2|1|A tariff surcharge may be added to this quotation in|Y
01|231326|2|2|the event of a sustained tariff increase on the|Y
01|231326|2|3|importation of this product.  Any surcharge will be|Y
01|231326|2|4|disclosed prior to acceptance of an order.|Y
01|231333|6|1|P/N: C5-C1.1/4-90|Y
01|231333|6|2|PSC C5 1.1/4 Milling Chuck with 90mm gauge length|Y
01|231333|6|3|Special Order. Net Price Each. MOQ: 10+|Y
01|231333|6|4|Cancellation is not accepted after receiving the PO.|Y
01|231333|6|5|It takes 6 MO.to complete the product after receiving|Y
01|231333|6|6|the approved drawing.|Y
01|231335|2|1|A tariff surcharge may be added to this quotation in|Y
01|231335|2|2|the event of a sustained tariff increase on the|Y
01|231335|2|3|importation of this product.  Any surcharge will be|Y
01|231335|2|4|disclosed prior to acceptance of an order.|Y
01|231349|14|1|A tariff surcharge of 8% will be added to every order|Y
01|231349|14|2|placed after September 1st 2025(until further notice).|Y
01|231349|14|3|This surcharge will be acknowledged upon acceptance|Y
01|231349|14|4|of every order.|Y
01|231350|1|1|RGA#TAR-61781|Y
01|231350|1|2|5AX-201FA-M SN: 7059|Y
01|231360|3|1|A tariff surcharge may be added to this quotation in|Y
01|231360|3|2|the event of a sustained tariff increase on the|Y
01|231360|3|3|importation of this product.  Any surcharge will be|Y
01|231360|3|4|disclosed prior to acceptance of an order.|Y
01|231361|1|1|1st batch(Part# change only)>2/3 APRVD(BenT)|Y
01|231376|7|1|A tariff surcharge may be added to this quotation in|Y
01|231376|7|2|the event of a sustained tariff increase on the|Y
01|231376|7|3|importation of this product.  Any surcharge will be|Y
01|231376|7|4|disclosed prior to acceptance of an order.|Y
01|231378|3|1|**Net Charge**|Y
01|231378|5|1|This item is special non standard stock. It cannot be|Y
01|231378|5|2|cancelled or returned upon receipt of PO.|Y
01|231378|7|1|**NET Charge**|Y
01|231378|8|1|A tariff surcharge may be added to this quotation in|Y
01|231378|8|2|the event of a sustained tariff increase on the|Y
01|231378|8|3|importation of this product.  Any surcharge will be|Y
01|231378|8|4|disclosed prior to acceptance of an order.|Y
01|231381|1|1|RGA#TOR-61812/|Y
01|231381|1|2|Repair of W1005-0875-2.48|Y
01|231385|2|1|A tariff surcharge may be added to this quotation in|Y
01|231385|2|2|the event of a sustained tariff increase on the|Y
01|231385|2|3|importation of this product.  Any surcharge will be|Y
01|231385|2|4|disclosed prior to acceptance of an order.|Y
01|231389|4|1|A tariff surcharge may be added to this quotation in|Y
01|231389|4|2|the event of a sustained tariff increase on the|Y
01|231389|4|3|importation of this product.  Any surcharge will be|Y
01|231389|4|4|disclosed prior to acceptance of an order.|Y
01|231391|10|1|A tariff surcharge may be added to this quotation in|Y
01|231391|10|2|the event of a sustained tariff increase on the|Y
01|231391|10|3|importation of this product.  Any surcharge will be|Y
01|231391|10|4|disclosed prior to acceptance of an order.|Y
01|231397|6|1|A tariff surcharge may be added to this quotation in|Y
01|231397|6|2|the event of a sustained tariff increase on the|Y
01|231397|6|3|importation of this product.  Any surcharge will be|Y
01|231397|6|4|disclosed prior to acceptance of an order.|Y
01|231402|1|1|T/P Inspection Require|Y
01|231402|2|1|T/P Inspection Require|Y
01|231402|3|1|T/P Inspection Require|Y
01|231402|4|1|T/P Inspection Require|Y
01|231402|5|1|1st Batch/1002233 Treske|Y
01|231407|2|1|A tariff surcharge may be added to this quotation in|Y
01|231407|2|2|the event of a sustained tariff increase on the|Y
01|231407|2|3|importation of this product.  Any surcharge will be|Y
01|231407|2|4|disclosed prior to acceptance of an order.|Y
01|231410|1|1|P/N: C5-SF0312-2.95CP|Y
01|231410|1|2|PSC C5 5/16 shrink fit holder with 2.95 G.L. and|Y
01|231410|1|3|Coolant Ports|Y
01|231410|2|1|5 PIECE PRICING|Y
01|231410|3|1|P/N: C5-SF0312-4.72CP|Y
01|231410|3|2|PSC C5 5/16 shrink fit holder with 4.72 g.l. and|Y
01|231410|3|3|Coolant Ports|Y
01|231410|4|1|5 PIECE PRICING|Y
01|231413|1|1|**Quoted at NET price**|Y
01|231413|1|2|This item is special non-standard stock. It cannot be|Y
01|231413|1|3|cancelled or returned upon receipt of PO.|Y
01|231413|1|4|DELIVERY: 10-12 Wks for MFG/shipping after approval|Y
01|231413|1|5|drawing is signed by customer|Y
01|231413|2|1|**Quoted at NET price**|Y
01|231413|2|2|This item is special non-standard stock. It cannot be|Y
01|231413|2|3|cancelled or returned upon receipt of order.|Y
01|231413|2|4|DELIVERY: 10-12 Wks for MFG/Shipping after approval|Y
01|231413|2|5|drawing is signed by customer.|Y
01|231414|2|1|A tariff surcharge may be added to this quotation in|Y
01|231414|2|2|the event of a sustained tariff increase on the|Y
01|231414|2|3|importation of this product.  Any surcharge will be|Y
01|231414|2|4|disclosed prior to acceptance of an order.|Y
01|231419|-13|1|A tariff surcharge may be added to this quotation in|Y
01|231419|-13|2|the event of a sustained tariff increase on the|Y
01|231419|-13|3|importation of this product.  Any surcharge will be|Y
01|231419|-13|4|disclosed prior to acceptance of an order.|Y
01|231423|2|1|A tariff surcharge may be added to this quotation in|Y
01|231423|2|2|the event of a sustained tariff increase on the|Y
01|231423|2|3|importation of this product.  Any surcharge will be|Y
01|231423|2|4|disclosed prior to acceptance of an order.|Y
01|231424|1|1|For 5AX-130MA-M SN: 4948|Y
01|231426|2|1|A tariff surcharge may be added to this quotation in|Y
01|231426|2|2|the event of a sustained tariff increase on the|Y
01|231426|2|3|importation of this product.  Any surcharge will be|Y
01|231426|2|4|disclosed prior to acceptance of an order.|Y
01|231427|7|1|A tariff surcharge of 8% will be added to every order|Y
01|231427|7|2|placed after September 1st 2025(until further notice).|Y
01|231427|7|3|This surcharge will be acknowledged upon acceptance|Y
01|231427|7|4|of every order.|Y
01|231435|6|1|MOTOR P/N:|Y
01|231435|6|2|DRIVE P/N:|Y
01|231435|6|3|CABLE SET:|Y
01|231435|8|1|LOCAL TRAVEL AND INSTALLATION.  REQUIRES 4TH AXIS|Y
01|231435|8|2|PREPERATION. SOFTWARE NOT INCLUDED.|Y
01|231435|8|3|1099 TO NEW VENDOR DME SERVICES|N
01|231435|8|4|COST = $4500|N
01|231435|12|1|STARTUP ASSISTANCE AND TRAINING WITH RS232|Y
01|231435|12|2|SERIAL PROGRAMMING INTERFACE. MACHINE OPTIONS AND|Y
01|231435|12|3|HARDWARE ARE NOT INCLUDED. PLEASE INQUIRE WITH|Y
01|231435|12|4|YOUR DEALER FOR COMPATIBILITY AND PROPER HARDWARE.|Y
01|231438|7|1|A tariff surcharge may be added to this quotation in|Y
01|231438|7|2|the event of a sustained tariff increase on the|Y
01|231438|7|3|importation of this product.  Any surcharge will be|Y
01|231438|7|4|disclosed prior to acceptance of an order.|Y
01|231442|2|1|A tariff surcharge may be added to this quotation in|Y
01|231442|2|2|the event of a sustained tariff increase on the|Y
01|231442|2|3|importation of this product.  Any surcharge will be|Y
01|231442|2|4|disclosed prior to acceptance of an order.|Y
01|231444|1|1|Includes air/hyd booster and new cable set|Y
01|231444|1|2|Replacement for serial #13909|Y
01|231444|1|3|Includes $2500.00 core buy back promo|Y
01|231444|2|1|Replacement for serial #2189|Y
01|231446|2|1|Installation includes: Drive unit short bar fiber|Y
01|231446|2|2|optic cable communications cable bulkhead cables|Y
01|231446|2|3|external cables service time and travel.|Y
01|231448|3|1|A tariff surcharge may be added to this quotation in|Y
01|231448|3|2|the event of a sustained tariff increase on the|Y
01|231448|3|3|importation of this product.  Any surcharge will be|Y
01|231448|3|4|disclosed prior to acceptance of an order.|Y
01|231454|1|1|RGA#TOR-61837/|Y
01|231454|1|2|Repair of PF-2|Y
01|231454|3|1|Calibration service included|Y
01|231455|2|1|Overstock promotional 20% extra added to the discount|Y
01|231455|2|2|on above toolholder.|Y
01|231455|2|3|This item ins non-returnable.|Y
01|231466|1|1|Mimatic Part# 197602|Y
01|231466|2|1|Mimatic Part# 197603|Y
01|231467|1|1|Additional 20% Overstock Promo discount applied.|Y
01|231467|1|2|Cannot be cancelled or returned upon receipt of PO.|Y
01|231471|6|1|A tariff surcharge of 8% will be added to every order|Y
01|231471|6|2|placed after September 1st 2025(until further notice).|Y
01|231471|6|3|This surcharge will be acknowledged upon acceptance|Y
01|231471|6|4|of every order.|Y
01|231477|5|1|CUSTOM MADE CABLES|Y
01|231481|1|1|Final Part# HSK100A-0437-15.00 **NET Price**|Y
01|231481|1|2|**SPECIAL - Non-cancellable Non-returnable**|Y
01|231481|1|3|HSK100A End Mill Holder 7/16 ChipHole 25K 15 GL|Y
01|231481|2|1|Final Part# HSK100A-0750-7.75 **NET Price**|Y
01|231481|2|2|**SPECIAL - Non-cancellable Non-returnable**|Y
01|231481|2|3|HSK100A End Mill Holder 3/4 ChipHole 25K 7.75 GL|Y
01|231481|5|1|Final Part# HSK100A-0250-9.00 **NET Price**|Y
01|231481|5|2|**SPECIAL - Non-cancellable Non-returnable**|Y
01|231481|5|3|HSK100A End Mill Holder 1/4 ChipHole 25K 9 GL|Y
01|231481|6|1|Final Part# HSK100A-1000-12.00 **NET Price**|Y
01|231481|6|2|**SPECIAL - Non-cancellable Non-returnable**|Y
01|231481|6|3|HSK100A End Mill Holder 1 ChipHole 25K 12 GL|Y
01|231481|7|1|Final Part# HSK100A-1000-9.00 **NET price**|Y
01|231481|7|2|**SPECIAL - Non-cancellable Non-returnable**|Y
01|231481|7|3|HSK100A End Mill Holder 1 ChipHole 25K 9 GL|Y
01|231481|8|1|Final Part# HSK100A-1250-12.00 **NET Price**|Y
01|231481|8|2|**SPECIAL - Non-cancellable Non-returnable**|Y
01|231481|8|3|HSK100A End Mill Holder 1.1/4 ChipHole 25K 12 GL|Y
01|231481|9|1|Final Part# HSK100A-0750-15.00 **NET Price**|Y
01|231481|9|2|**SPECIAL - Non-cancellable Non-returnable**|Y
01|231481|9|3|HSK100A End Mill Holder 3/4 ChipHole 25K 15 GL|Y
01|231481|10|1|Final Part# HSK100A-ER20-9.00 **NET Price**|Y
01|231481|10|2|**SPECIAL - Non-cancellable Non-returnable**|Y
01|231481|10|3|HSK100A ER20 Collet Chuck HiTorque BearingNut 25K 9GL|Y
01|231481|13|1|Final Part# HSK100A-ER32-8.00 **NET Price**|Y
01|231481|13|2|**SPECIAL - Non-cancellable Non-returnable**|Y
01|231481|13|3|HSK100A ER32 Collet Chuck HiTorque BearingNut ChipHole|Y
01|231481|13|4|8 GL|Y
01|231481|23|1|A tariff surcharge may be added to this quotation in|Y
01|231481|23|2|the event of a sustained tariff increase on the|Y
01|231481|23|3|importation of this product.  Any surcharge will be|Y
01|231481|23|4|disclosed prior to acceptance of an order.|Y
01|231488|2|1|A tariff surcharge may be added to this quotation in|Y
01|231488|2|2|the event of a sustained tariff increase on the|Y
01|231488|2|3|importation of this product.  Any surcharge will be|Y
01|231488|2|4|disclosed prior to acceptance of an order.|Y
01|231493|1|2|Price for quanity 1-2pcs|Y
01|231493|2|1|Price for quanity 3-4pcs|Y
01|231493|3|1|Price for quanity 5-6pcs|Y
01|231495|1|1|match with serial#36928TN|Y
01|231495|1|2|special RT w/o Groove|Y
01|231495|3|1|match with serial#48020|Y
01|231495|3|2|special support table w/o Groove|Y
01|231495|4|1|A tariff surcharge may be added to this quotation in|Y
01|231495|4|2|the event of a sustained tariff increase on the|Y
01|231495|4|3|importation of this product.  Any surcharge will be|Y
01|231495|4|4|disclosed prior to acceptance of an order.|Y
01|231509|8|1|A tariff surcharge may be added to this quotation in|Y
01|231509|8|2|the event of a sustained tariff increase on the|Y
01|231509|8|3|importation of this product.  Any surcharge will be|Y
01|231509|8|4|disclosed prior to acceptance of an order.|Y
01|231512|2|1|A tariff surcharge may be added to this quotation in|Y
01|231512|2|2|the event of a sustained tariff increase on the|Y
01|231512|2|3|importation of this product.  Any surcharge will be|Y
01|231512|2|4|disclosed prior to acceptance of an order.|Y
01|231516|1|1|1st Batch/Please provide the drawing|N
01|231516|2|1|1st Batch Alt#TQW-ER32/SK20(50)MFG45working days(12/B)|Y
01|231520|1|1|For stock/1st Batch 11/26 approvedMFG100 WORKING DAY(4|Y
01|231520|2|1|T/P Inspection Required|Y
01|231520|3|1|T/P Inspection Required|Y
01|231520|4|1|T/P Inspection Required|Y
01|231520|5|1|T/P Inspection RequiredMFG5/30UPD3/21>>6/E B|Y
01|231520|6|1|T/P Inspection Required|Y
01|231523|2|1|A tariff surcharge may be added to this quotation in|Y
01|231523|2|2|the event of a sustained tariff increase on the|Y
01|231523|2|3|importation of this product.  Any surcharge will be|Y
01|231523|2|4|disclosed prior to acceptance of an order.|Y
01|231525|1|1|Tariff Code: 7318.16.0085|Y
01|231525|1|2|Country of Origin: Japan|Y
01|231528|23|1|A tariff surcharge may be added to this quotation in|Y
01|231528|23|2|the event of a sustained tariff increase on the|Y
01|231528|23|3|importation of this product.  Any surcharge will be|Y
01|231528|23|4|disclosed prior to acceptance of an order.|Y
01|231534|4|1|A tariff surcharge may be added to this quotation in|Y
01|231534|4|2|the event of a sustained tariff increase on the|Y
01|231534|4|3|importation of this product.  Any surcharge will be|Y
01|231534|4|4|disclosed prior to acceptance of an order.|Y
01|231535|1|1|Tariff Code: 7318.16.0085|Y
01|231535|1|2|Country of Origin Japan|Y
01|231537|1|1|BT50-2TG16S-200|Y
01|231537|1|2|BT50 Thermo Grip TG Chuck 16mm Slim|Y
01|231537|2|1|BT50-2TG10S-200|Y
01|231537|2|2|BT50 Thermo Grip TG Chuck 10mm Slim|Y
01|231537|3|1|BT50-2TG6S-200|Y
01|231537|3|2|BT50 Thermo Grip TG Chuck 6mm Slim|Y
01|231538|2|1|A tariff surcharge may be added to this quotation in|Y
01|231538|2|2|the event of a sustained tariff increase on the|Y
01|231538|2|3|importation of this product.  Any surcharge will be|Y
01|231538|2|4|disclosed prior to acceptance of an order.|Y
01|231542|2|1|A tariff surcharge may be added to this quotation in|Y
01|231542|2|2|the event of a sustained tariff increase on the|Y
01|231542|2|3|importation of this product.  Any surcharge will be|Y
01|231542|2|4|disclosed prior to acceptance of an order.|Y
01|231544|4|1|A tariff surcharge may be added to this quotation in|Y
01|231544|4|2|the event of a sustained tariff increase on the|Y
01|231544|4|3|importation of this product.  Any surcharge will be|Y
01|231544|4|4|disclosed prior to acceptance of an order.|Y
01|231546|1|1|CCK3/4-3|Y
01|231546|2|1|CKFN20(3/4)-3|Y
01|231547|4|1|A tariff surcharge may be added to this quotation in|Y
01|231547|4|2|the event of a sustained tariff increase on the|Y
01|231547|4|3|importation of this product.  Any surcharge will be|Y
01|231547|4|4|disclosed prior to acceptance of an order.|Y
01|231550|2|1|A tariff surcharge may be added to this quotation in|Y
01|231550|2|2|the event of a sustained tariff increase on the|Y
01|231550|2|3|importation of this product.  Any surcharge will be|Y
01|231550|2|4|disclosed prior to acceptance of an order.|Y
01|231556|4|1|Base Plate for 5AX201-YA-M to Zero Clamp Pneumatic|Y
01|231562|2|1|DELIVERY: 1 STOCK Balance ~1-2 Wks for PO placed by|Y
01|231562|2|2|4/29. 3Wks for PO placed after.|Y
01|231564|13|1|A tariff surcharge may be added to this quotation in|Y
01|231564|13|2|the event of a sustained tariff increase on the|Y
01|231564|13|3|importation of this product.  Any surcharge will be|Y
01|231564|13|4|disclosed prior to acceptance of an order.|Y
01|231569|3|1|A tariff surcharge may be added to this quotation in|Y
01|231569|3|2|the event of a sustained tariff increase on the|Y
01|231569|3|3|importation of this product.  Any surcharge will be|Y
01|231569|3|4|disclosed prior to acceptance of an order.|Y
01|231570|2|1|A tariff surcharge may be added to this quotation in|Y
01|231570|2|2|the event of a sustained tariff increase on the|Y
01|231570|2|3|importation of this product.  Any surcharge will be|Y
01|231570|2|4|disclosed prior to acceptance of an order.|Y
01|231576|1|1|Final Part# TBD **Quoted at NET Price**|Y
01|231576|1|2|SPECIAL - **Cannot be cancelled or returned**|Y
01|231576|1|3|Special Version Angle-Head w/ ER16 collet chuck 90deg|Y
01|231576|2|1|Final Part# TBD **Quoted at NET Price**|Y
01|231576|2|2|SPECIAL - **Cannot be cancelled or returned**|Y
01|231576|2|3|Special Version Angle-Head w/ ER25 collet chuck 90deg|Y
01|231576|8|1|LN to make positioning block. Lead time 1 Wk after|Y
01|231576|8|2|receipt of spindle specs|Y
01|231576|9|1|A tariff surcharge may be added to this quotation in|Y
01|231576|9|2|the event of a sustained tariff increase on the|Y
01|231576|9|3|importation of this product.  Any surcharge will be|Y
01|231576|9|4|disclosed prior to acceptance of an order.|Y
01|231581|2|1|A tariff surcharge may be added to this quotation in|Y
01|231581|2|2|the event of a sustained tariff increase on the|Y
01|231581|2|3|importation of this product.  Any surcharge will be|Y
01|231581|2|4|disclosed prior to acceptance of an order.|Y
01|231585|7|1|Quoted at NET price.|Y
01|231585|14|1|Quoted at Net Price|Y
01|231585|20|1|Please Note: Installation quoted is for the TID system|Y
01|231585|20|2|and purchase of 1 of the above Pre-Setters.|Y
01|231585|26|1|A tariff surcharge may be added to this quotation in|Y
01|231585|26|2|the event of a sustained tariff increase on the|Y
01|231585|26|3|importation of this product.  Any surcharge will be|Y
01|231585|26|4|disclosed prior to acceptance of an order.|Y
01|231594|1|1|**NET Price includes cost of holder BIS-C-122-04/L|Y
01|231594|1|2|and chip install/rebalance fee.|Y
01|231594|2|1|**NET Price includes cost of holder BIS-C-122-04/L|Y
01|231594|2|2|and chip install/rebalance fee.|Y
01|231596|9|1|A tariff surcharge may be added to this quotation in|Y
01|231596|9|2|the event of a sustained tariff increase on the|Y
01|231596|9|3|importation of this product.  Any surcharge will be|Y
01|231596|9|4|disclosed prior to acceptance of an order.|Y
01|231599|9|1|A tariff surcharge may be added to this quotation in|Y
01|231599|9|2|the event of a sustained tariff increase on the|Y
01|231599|9|3|importation of this product.  Any surcharge will be|Y
01|231599|9|4|disclosed prior to acceptance of an order.|Y
01|231600|1|1|RGA#LVR-61831/|Y
01|231600|1|2|Repair of MZMP5-ER40Z-ICE s/n: 22900243 02|Y
01|231600|1|3|(Mimatic#131597)|Y
01|231600|2|1|Bearings seals o-rings and damaged gears to be|Y
01|231600|2|2|replaced.|Y
01|231600|4|1|RGA#LVR-61831/|Y
01|231600|4|2|Repair of MZMP5-ER40Z-ICE s/n:22900243 03|Y
01|231600|4|3|(Mimatic#131597)|Y
01|231600|5|1|Bearings seals and o-rings to be replaced.|Y
01|231607|1|1|RGA#TAR-61823|Y
01|231607|1|2|5AX2002FA-M SN:1654|Y
01|231607|33|1|Custom Made Special Cables|Y
01|231607|33|2|Tilting Axis Power and Feedback Cable Set|Y
01|231607|33|3|Rotary Axis Power and Feedback Cable Set|Y
01|231607|34|1|A tariff surcharge may be added to this quotation in|Y
01|231607|34|2|the event of a sustained tariff increase on the|Y
01|231607|34|3|importation of this product.  Any surcharge will be|Y
01|231607|34|4|disclosed prior to acceptance of an order.|Y
01|231608|1|1|RGA#TAR-61823|Y
01|231608|1|2|5AX2002FA-M SN:2019|Y
01|231608|33|1|Custom Made Special Cables|Y
01|231608|33|2|Tilting Axis Power and Feedback Cable Set|Y
01|231608|33|3|Rotary Axis Power and Feedback Cable Set|Y
01|231608|34|1|A tariff surcharge may be added to this quotation in|Y
01|231608|34|2|the event of a sustained tariff increase on the|Y
01|231608|34|3|importation of this product.  Any surcharge will be|Y
01|231608|34|4|disclosed prior to acceptance of an order.|Y
01|231620|8|1|A tariff surcharge of 8% will be added to every order|Y
01|231620|8|2|placed after September 1st 2025(until further notice).|Y
01|231620|8|3|This surcharge will be acknowledged upon acceptance|Y
01|231620|8|4|of every order.|Y
01|231626|1|1|**Special non-standard stock. Cannot be cancelled or|Y
01|231626|1|2|returned upon receipt of PO.**|Y
01|231628|4|1|A tariff surcharge may be added to this quotation in|Y
01|231628|4|2|the event of a sustained tariff increase on the|Y
01|231628|4|3|importation of this product.  Any surcharge will be|Y
01|231628|4|4|disclosed prior to acceptance of an order.|Y
01|231629|17|1|A tariff surcharge may be added to this quotation in|Y
01|231629|17|2|the event of a sustained tariff increase on the|Y
01|231629|17|3|importation of this product.  Any surcharge will be|Y
01|231629|17|4|disclosed prior to acceptance of an order.|Y
01|231630|2|1|A tariff surcharge may be added to this quotation in|Y
01|231630|2|2|the event of a sustained tariff increase on the|Y
01|231630|2|3|importation of this product.  Any surcharge will be|Y
01|231630|2|4|disclosed prior to acceptance of an order.|Y
01|231631|4|1|A tariff surcharge may be added to this quotation in|Y
01|231631|4|2|the event of a sustained tariff increase on the|Y
01|231631|4|3|importation of this product.  Any surcharge will be|Y
01|231631|4|4|disclosed prior to acceptance of an order.|Y
01|231632|1|1|TCE-97619-3500T Modified (Female-Male)|Y
01|231632|2|1|TCE-97625-3500T Modified (Female-Male)|Y
01|231637|4|1|Installation: Drive unit cables parameter changes.|Y
01|231637|5|1|A tariff surcharge of 8% will be added to every order|Y
01|231637|5|2|placed after September 1st 2025(until further notice).|Y
01|231637|5|3|This surcharge will be acknowledged upon acceptance|Y
01|231637|5|4|of every order.|Y
01|231645|9|1|A tariff surcharge may be added to this quotation in|Y
01|231645|9|2|the event of a sustained tariff increase on the|Y
01|231645|9|3|importation of this product.  Any surcharge will be|Y
01|231645|9|4|disclosed prior to acceptance of an order.|Y
01|231648|1|1|Net price for AHNSA|Y
01|231648|1|2|Non returnable Non cancelable once PO is issued.|Y
01|231652|1|1|Includes: 10+1RJ built in rotary union.|Y
01|231663|4|1|A tariff surcharge may be added to this quotation in|Y
01|231663|4|2|the event of a sustained tariff increase on the|Y
01|231663|4|3|importation of this product.  Any surcharge will be|Y
01|231663|4|4|disclosed prior to acceptance of an order.|Y
01|231668|1|1|INCLUDES 15 CAT40 STANDARD INCH SIZE SHRINK FIT HOLDERS|Y
01|231668|1|2|with less than 6.00 gauge lengths.|Y
01|231669|1|1|INCLUDES 10 CAT40 STANDARD INCH SIZE SHRINK FIT HOLDERS|Y
01|231669|1|2|with less than 6.00 gauge lengths.|Y
01|231679|2|1|A tariff surcharge may be added to this quotation in|Y
01|231679|2|2|the event of a sustained tariff increase on the|Y
01|231679|2|3|importation of this product.  Any surcharge will be|Y
01|231679|2|4|disclosed prior to acceptance of an order.|Y
01|231680|1|1|*To be installed w/ the NC5-46-SK16C-120 @ Factory|Y
01|231680|2|1|*To be installed w/ PS-N63AE @ Factory.|Y
01|231680|3|1|A tariff surcharge may be added to this quotation in|Y
01|231680|3|2|the event of a sustained tariff increase on the|Y
01|231680|3|3|importation of this product.  Any surcharge will be|Y
01|231680|3|4|disclosed prior to acceptance of an order.|Y
01|231681|2|1|A tariff surcharge may be added to this quotation in|Y
01|231681|2|2|the event of a sustained tariff increase on the|Y
01|231681|2|3|importation of this product.  Any surcharge will be|Y
01|231681|2|4|disclosed prior to acceptance of an order.|Y
01|231686|5|1|Self contained 5c dead length collet closer|Y
01|231686|5|2|with adapter ring|Y
01|231686|6|1|16C self contained dead lenght collet closer|Y
01|231692|7|1|A tariff surcharge may be added to this quotation in|Y
01|231692|7|2|the event of a sustained tariff increase on the|Y
01|231692|7|3|importation of this product.  Any surcharge will be|Y
01|231692|7|4|disclosed prior to acceptance of an order.|Y
01|231694|3|1|A tariff surcharge may be added to this quotation in|Y
01|231694|3|2|the event of a sustained tariff increase on the|Y
01|231694|3|3|importation of this product.  Any surcharge will be|Y
01|231694|3|4|disclosed prior to acceptance of an order.|Y
01|231698|4|1|A tariff surcharge may be added to this quotation in|Y
01|231698|4|2|the event of a sustained tariff increase on the|Y
01|231698|4|3|importation of this product.  Any surcharge will be|Y
01|231698|4|4|disclosed prior to acceptance of an order.|Y
01|231703|1|1|Special IMTS end of year promotion.|Y
01|231703|3|1|CONFIRMATION SWITCHES/BRACKET/COVER FOR PB-105-2W|Y
01|231703|4|1|Robodrill spec|Y
01|231703|5|1|Robodrill  spec|Y
01|231706|7|1|A tariff surcharge may be added to this quotation in|Y
01|231706|7|2|the event of a sustained tariff increase on the|Y
01|231706|7|3|importation of this product.  Any surcharge will be|Y
01|231706|7|4|disclosed prior to acceptance of an order.|Y
01|231723|7|1|A tariff surcharge may be added to this quotation in|Y
01|231723|7|2|the event of a sustained tariff increase on the|Y
01|231723|7|3|importation of this product.  Any surcharge will be|Y
01|231723|7|4|disclosed prior to acceptance of an order.|Y
01|231725|2|1|A tariff surcharge may be added to this quotation in|Y
01|231725|2|2|the event of a sustained tariff increase on the|Y
01|231725|2|3|importation of this product.  Any surcharge will be|Y
01|231725|2|4|disclosed prior to acceptance of an order.|Y
01|231728|6|1|Placeholder for BT40-SK13-120.|Y
01|231728|6|2|Please note this is considered special...once PO/order|Y
01|231728|6|3|has been received this cannot be returned/cancelled.|Y
01|231728|12|1|A tariff surcharge may be added to this quotation in|Y
01|231728|12|2|the event of a sustained tariff increase on the|Y
01|231728|12|3|importation of this product.  Any surcharge will be|Y
01|231728|12|4|disclosed prior to acceptance of an order.|Y
01|231747|1|1|Additional 20% overstock promo discount applied.|Y
01|231747|1|2|**Non-cancellable non-returnable**|Y
01|231747|2|1|Applies to 075-027 only|Y
01|231750|1|1|RTP#TAR-61855|Y
01|231750|1|2|5AX-SW105-203AZ SN: 1053|Y
01|231750|14|1|SPECIAL PART TC175X210X15|Y
01|231754|5|1|A tariff surcharge may be added to this quotation in|Y
01|231754|5|2|the event of a sustained tariff increase on the|Y
01|231754|5|3|importation of this product.  Any surcharge will be|Y
01|231754|5|4|disclosed prior to acceptance of an order.|Y
01|231758|2|1|A tariff surcharge may be added to this quotation in|Y
01|231758|2|2|the event of a sustained tariff increase on the|Y
01|231758|2|3|importation of this product.  Any surcharge will be|Y
01|231758|2|4|disclosed prior to acceptance of an order.|Y
01|231759|2|1|A tariff surcharge may be added to this quotation in|Y
01|231759|2|2|the event of a sustained tariff increase on the|Y
01|231759|2|3|importation of this product.  Any surcharge will be|Y
01|231759|2|4|disclosed prior to acceptance of an order.|Y
01|231771|2|1|A tariff surcharge may be added to this quotation in|Y
01|231771|2|2|the event of a sustained tariff increase on the|Y
01|231771|2|3|importation of this product.  Any surcharge will be|Y
01|231771|2|4|disclosed prior to acceptance of an order.|Y
01|231772|3|1|A tariff surcharge may be added to this quotation in|Y
01|231772|3|2|the event of a sustained tariff increase on the|Y
01|231772|3|3|importation of this product.  Any surcharge will be|Y
01|231772|3|4|disclosed prior to acceptance of an order.|Y
01|231775|4|1|A tariff surcharge may be added to this quotation in|Y
01|231775|4|2|the event of a sustained tariff increase on the|Y
01|231775|4|3|importation of this product.  Any surcharge will be|Y
01|231775|4|4|disclosed prior to acceptance of an order.|Y
01|231779|1|1|No need Ins.|Y
01|231779|2|1|No need Ins.|Y
01|231779|3|1|No need Ins.|Y
01|231780|5|1|A tariff surcharge may be added to this quotation in|Y
01|231780|5|2|the event of a sustained tariff increase on the|Y
01|231780|5|3|importation of this product.  Any surcharge will be|Y
01|231780|5|4|disclosed prior to acceptance of an order.|Y
01|231787|1|1|NC5-46-C16-120|Y
01|231787|1|2|NC5-46 Milling Chuck 16mm 12K|Y
01|231787|1|3|*To be installed w/ PS-N46E @ Factory.|Y
01|231787|2|1|*To be installed w/ NC5-46-C16-120 @ Factory.|Y
01|231787|3|1|MCG16-6HG-S6|Y
01|231787|3|2|NC5 Milling Chuck O-Ring Coolant Stopper|Y
01|231789|4|1|A tariff surcharge may be added to this quotation in|Y
01|231789|4|2|the event of a sustained tariff increase on the|Y
01|231789|4|3|importation of this product.  Any surcharge will be|Y
01|231789|4|4|disclosed prior to acceptance of an order.|Y
01|231793|2|1|A tariff surcharge may be added to this quotation in|Y
01|231793|2|2|the event of a sustained tariff increase on the|Y
01|231793|2|3|importation of this product.  Any surcharge will be|Y
01|231793|2|4|disclosed prior to acceptance of an order.|Y
01|231794|4|1|A tariff surcharge of 8% will be added to every order|Y
01|231794|4|2|placed after September 1st 2025(until further notice).|Y
01|231794|4|3|This surcharge will be acknowledged upon acceptance|Y
01|231794|4|4|of every order.|Y
01|231796|9|1|Please Note: Overstock Promotion Extra 20% added to|Y
01|231796|9|2|the discount for MZQT47-CO32MMX.|Y
01|231796|10|1|A tariff surcharge may be added to this quotation in|Y
01|231796|10|2|the event of a sustained tariff increase on the|Y
01|231796|10|3|importation of this product.  Any surcharge will be|Y
01|231796|10|4|disclosed prior to acceptance of an order.|Y
01|231797|1|1|INCLUDES A TOTAL OF 10 CAT40/BT40 STANDARD INCH SIZE|Y
01|231797|1|2|SHRINK FIT HOLDERS with less than 6.00 gague lengths.|Y
01|231798|1|1|INCLUDES A TOTAL OF 10 CAT40/BT40 STANDARD INCH SIZE|Y
01|231798|1|2|SHRINK FIT HOLDERS with less than 6.00 gauge length.|Y
01|231799|2|1|A tariff surcharge may be added to this quotation in|Y
01|231799|2|2|the event of a sustained tariff increase on the|Y
01|231799|2|3|importation of this product.  Any surcharge will be|Y
01|231799|2|4|disclosed prior to acceptance of an order.|Y
01|231801|2|1|Please note additional 20% applied per overstock promo.|Y
01|231801|2|2|These items cannot be cancelled or returned upon|Y
01|231801|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|231801|2|4|need to be requoted.|Y
01|231814|2|1|A tariff surcharge may be added to this quotation in|Y
01|231814|2|2|the event of a sustained tariff increase on the|Y
01|231814|2|3|importation of this product.  Any surcharge will be|Y
01|231814|2|4|disclosed prior to acceptance of an order.|Y
01|231820|2|1|A tariff surcharge may be added to this quotation in|Y
01|231820|2|2|the event of a sustained tariff increase on the|Y
01|231820|2|3|importation of this product.  Any surcharge will be|Y
01|231820|2|4|disclosed prior to acceptance of an order.|Y
01|231822|4|1|A tariff surcharge of 8% will be added to every order|Y
01|231822|4|2|placed after September 1st 2025(until further notice).|Y
01|231822|4|3|This surcharge will be acknowledged upon acceptance|Y
01|231822|4|4|of every order.|Y
01|231823|2|1|A tariff surcharge may be added to this quotation in|Y
01|231823|2|2|the event of a sustained tariff increase on the|Y
01|231823|2|3|importation of this product.  Any surcharge will be|Y
01|231823|2|4|disclosed prior to acceptance of an order.|Y
01|231825|2|1|A tariff surcharge may be added to this quotation in|Y
01|231825|2|2|the event of a sustained tariff increase on the|Y
01|231825|2|3|importation of this product.  Any surcharge will be|Y
01|231825|2|4|disclosed prior to acceptance of an order.|Y
01|231828|5|1|A tariff surcharge may be added to this quotation in|Y
01|231828|5|2|the event of a sustained tariff increase on the|Y
01|231828|5|3|importation of this product.  Any surcharge will be|Y
01|231828|5|4|disclosed prior to acceptance of an order.|Y
01|231831|1|1|RGA#TAR-61865|Y
01|231831|1|2|TAT-170 SN:41893B|Y
01|231834|2|1|A tariff surcharge may be added to this quotation in|Y
01|231834|2|2|the event of a sustained tariff increase on the|Y
01|231834|2|3|importation of this product.  Any surcharge will be|Y
01|231834|2|4|disclosed prior to acceptance of an order.|Y
01|231837|1|1|Quoted at Net Price Once a purchase order is placed it|Y
01|231837|1|2|cannot be cancelled or returned. Thank you!|Y
01|231837|1|3|Tariff Code: 8466.10.0175|Y
01|231837|1|4|Country of Origin; Taiwan|Y
01|231837|2|1|Please Note: Net price includes the cost of the|Y
01|231837|2|2|BIS-M-122-02/A and etching of Pratts # PT457340REV-|Y
01|231837|2|3|on holder and packaging.|Y
01|231840|1|1|LIST PRICE = $56280|Y
01|231840|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|231840|3|1|ELLISON WILL HANDLE TILTED WORKPLANE|Y
01|231841|1|1|With specified Fanuc motors and encoders|Y
01|231841|2|1|RCN2390F scale with adapter plate|Y
01|231847|1|1|Additional 20% Overstock Promo Discount applied.|Y
01|231847|1|2|Cannot be cancelled or returned.|Y
01|231852|2|1|A tariff surcharge may be added to this quotation in|Y
01|231852|2|2|the event of a sustained tariff increase on the|Y
01|231852|2|3|importation of this product.  Any surcharge will be|Y
01|231852|2|4|disclosed prior to acceptance of an order.|Y
01|231854|3|1|**Gage length 2.95 - Orizon prefers 3|Y
01|231854|7|1|**Gage length 3 - Orizon prefers 2.95 on 3/4 new one|Y
01|231854|8|1|**Gage length 3.15-Orizon prefers 2.95 on new ones|Y
01|231854|10|1|**Gage length 3 - Orizon prefers 3.125 on new ones|Y
01|231854|13|1|**Gage length 3 - Orizon prefers 100mm(3.93) for new|Y
01|231854|14|1|**Gage length 75mm-Orizon prefers 100mm(3.93) for new|Y
01|231854|17|1|A tariff surcharge may be added to this quotation in|Y
01|231854|17|2|the event of a sustained tariff increase on the|Y
01|231854|17|3|importation of this product.  Any surcharge will be|Y
01|231854|17|4|disclosed prior to acceptance of an order.|Y
01|231859|8|1|**NET charge**|Y
01|231860|7|1|**NET charge**|Y
01|231860|8|1|A tariff surcharge of 8% will be added to every order|Y
01|231860|8|2|placed after September 1st 2025(until further notice).|Y
01|231860|8|3|This surcharge will be acknowledged upon acceptance|Y
01|231860|8|4|of every order.|Y
01|231861|1|1|RGA#LVR-61847/|Y
01|231861|1|2|Repair of MZQT46-ER25Z-MS s/n: 51134 03|Y
01|231861|1|3|(Mimatic#124649)|Y
01|231861|2|1|Bearings seals and o-rings to be replaced|Y
01|231863|8|1|A tariff surcharge may be added to this quotation in|Y
01|231863|8|2|the event of a sustained tariff increase on the|Y
01|231863|8|3|importation of this product.  Any surcharge will be|Y
01|231863|8|4|disclosed prior to acceptance of an order.|Y
01|231864|4|1|FOR SV-40P S#MLB5353 DATE: JULY-2005|Y
01|231864|4|2|Only 1 required|Y
01|231867|2|1|A tariff surcharge may be added to this quotation in|Y
01|231867|2|2|the event of a sustained tariff increase on the|Y
01|231867|2|3|importation of this product.  Any surcharge will be|Y
01|231867|2|4|disclosed prior to acceptance of an order.|Y
01|231870|34|1|A tariff surcharge may be added to this quotation in|Y
01|231870|34|2|the event of a sustained tariff increase on the|Y
01|231870|34|3|importation of this product.  Any surcharge will be|Y
01|231870|34|4|disclosed prior to acceptance of an order.|Y
01|231872|2|1|Extra 20% added to the discountfor Overstock Promo|Y
01|231872|2|2|Tool is non-returnable. Thank you|Y
01|231873|2|1|Please note additional 20% applied per overstock promo.|Y
01|231873|2|2|These items cannot be cancelled or returned upon|Y
01|231873|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|231873|2|4|need to be requoted.|Y
01|231873|3|1|A tariff surcharge may be added to this quotation in|Y
01|231873|3|2|the event of a sustained tariff increase on the|Y
01|231873|3|3|importation of this product.  Any surcharge will be|Y
01|231873|3|4|disclosed prior to acceptance of an order.|Y
01|231874|12|1|A tariff surcharge of 8% will be added to every order|Y
01|231874|12|2|placed after September 1st 2025(until further notice).|Y
01|231874|12|3|This surcharge will be acknowledged upon acceptance|Y
01|231874|12|4|of every order.|Y
01|231878|1|1|Placeholder for C4007-0032-3.13DIN-M...|Y
01|231878|1|2|These are non-standard stock items and considered|Y
01|231878|1|3|specials. Once a PO has been issued these items|Y
01|231878|1|4|cannot be cancelled or returned.|Y
01|231878|3|1|Placeholder for C4007-0032-5.00DIN-M...|Y
01|231878|3|2|These are non-standard stock items and considered|Y
01|231878|3|3|specials. Once a PO has been issued these items|Y
01|231878|3|4|cannot be cancelled or returned.|Y
01|231878|4|1|A tariff surcharge may be added to this quotation in|Y
01|231878|4|2|the event of a sustained tariff increase on the|Y
01|231878|4|3|importation of this product.  Any surcharge will be|Y
01|231878|4|4|disclosed prior to acceptance of an order.|Y
01|231880|3|1|A tariff surcharge may be added to this quotation in|Y
01|231880|3|2|the event of a sustained tariff increase on the|Y
01|231880|3|3|importation of this product.  Any surcharge will be|Y
01|231880|3|4|disclosed prior to acceptance of an order.|Y
01|231884|13|1|A tariff surcharge may be added to this quotation in|Y
01|231884|13|2|the event of a sustained tariff increase on the|Y
01|231884|13|3|importation of this product.  Any surcharge will be|Y
01|231884|13|4|disclosed prior to acceptance of an order.|Y
01|231885|6|1|A tariff surcharge may be added to this quotation in|Y
01|231885|6|2|the event of a sustained tariff increase on the|Y
01|231885|6|3|importation of this product.  Any surcharge will be|Y
01|231885|6|4|disclosed prior to acceptance of an order.|Y
01|231886|12|1|A tariff surcharge may be added to this quotation in|Y
01|231886|12|2|the event of a sustained tariff increase on the|Y
01|231886|12|3|importation of this product.  Any surcharge will be|Y
01|231886|12|4|disclosed prior to acceptance of an order.|Y
01|231887|2|1|A tariff surcharge may be added to this quotation in|Y
01|231887|2|2|the event of a sustained tariff increase on the|Y
01|231887|2|3|importation of this product.  Any surcharge will be|Y
01|231887|2|4|disclosed prior to acceptance of an order.|Y
01|231889|2|1|A tariff surcharge may be added to this quotation in|Y
01|231889|2|2|the event of a sustained tariff increase on the|Y
01|231889|2|3|importation of this product.  Any surcharge will be|Y
01|231889|2|4|disclosed prior to acceptance of an order.|Y
01|231890|1|1|**Non-returnable non-cancellable**|Y
01|231892|2|1|A tariff surcharge may be added to this quotation in|Y
01|231892|2|2|the event of a sustained tariff increase on the|Y
01|231892|2|3|importation of this product.  Any surcharge will be|Y
01|231892|2|4|disclosed prior to acceptance of an order.|Y
01|231894|4|1|A tariff surcharge may be added to this quotation in|Y
01|231894|4|2|the event of a sustained tariff increase on the|Y
01|231894|4|3|importation of this product.  Any surcharge will be|Y
01|231894|4|4|disclosed prior to acceptance of an order.|Y
01|231906|2|1|A tariff surcharge may be added to this quotation in|Y
01|231906|2|2|the event of a sustained tariff increase on the|Y
01|231906|2|3|importation of this product.  Any surcharge will be|Y
01|231906|2|4|disclosed prior to acceptance of an order.|Y
01|231913|3|1|Clamping Range 1.063 - 1.125|Y
01|231913|3|2|28mm = 1.102|Y
01|231920|11|1|A tariff surcharge may be added to this quotation in|Y
01|231920|11|2|the event of a sustained tariff increase on the|Y
01|231920|11|3|importation of this product.  Any surcharge will be|Y
01|231920|11|4|disclosed prior to acceptance of an order.|Y
01|231930|3|1|Does Not include AMP/Cables/Fiber Optic/Hardware/PRM|Y
01|231931|4|1|A special discount is available until the end of May.|Y
01|231931|4|2|The regular discount is 20%.|Y
01|231931|5|1|A special discount is available until the end of May.|Y
01|231931|5|2|The regular discount is 20%.|Y
01|231932|5|1|Pratt Burnerd 1843-2A11EX _ A211 Mount_18 Inch chuck|Y
01|231932|5|2|Thru Hole 6.50|Y
01|231934|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|231934|4|1|A tariff surcharge may be added to this quotation in|Y
01|231934|4|2|the event of a sustained tariff increase on the|Y
01|231934|4|3|importation of this product.  Any surcharge will be|Y
01|231934|4|4|disclosed prior to acceptance of an order.|Y
01|231935|2|1|A tariff surcharge may be added to this quotation in|Y
01|231935|2|2|the event of a sustained tariff increase on the|Y
01|231935|2|3|importation of this product.  Any surcharge will be|Y
01|231935|2|4|disclosed prior to acceptance of an order.|Y
01|231939|2|1|A tariff surcharge may be added to this quotation in|Y
01|231939|2|2|the event of a sustained tariff increase on the|Y
01|231939|2|3|importation of this product.  Any surcharge will be|Y
01|231939|2|4|disclosed prior to acceptance of an order.|Y
01|231941|2|1|A tariff surcharge may be added to this quotation in|Y
01|231941|2|2|the event of a sustained tariff increase on the|Y
01|231941|2|3|importation of this product.  Any surcharge will be|Y
01|231941|2|4|disclosed prior to acceptance of an order.|Y
01|231942|8|1|Oil Chiller with hoses AKZ149-T|Y
01|231945|2|1|A tariff surcharge may be added to this quotation in|Y
01|231945|2|2|the event of a sustained tariff increase on the|Y
01|231945|2|3|importation of this product.  Any surcharge will be|Y
01|231945|2|4|disclosed prior to acceptance of an order.|Y
01|231946|6|1|SK25-18AC|Y
01|231946|7|1|A tariff surcharge may be added to this quotation in|Y
01|231946|7|2|the event of a sustained tariff increase on the|Y
01|231946|7|3|importation of this product.  Any surcharge will be|Y
01|231946|7|4|disclosed prior to acceptance of an order.|Y
01|231952|8|1|Installation includes: Drive unit short bar fiber|Y
01|231952|8|2|optic cable communications cable external cables|Y
01|231952|8|3|parameter changes service time and travel.|Y
01|231952|8|4|Installation to take 2-days|Y
01|231956|31|1|A tariff surcharge may be added to this quotation in|Y
01|231956|31|2|the event of a sustained tariff increase on the|Y
01|231956|31|3|importation of this product.  Any surcharge will be|Y
01|231956|31|4|disclosed prior to acceptance of an order.|Y
01|231958|2|1|A tariff surcharge may be added to this quotation in|Y
01|231958|2|2|the event of a sustained tariff increase on the|Y
01|231958|2|3|importation of this product.  Any surcharge will be|Y
01|231958|2|4|disclosed prior to acceptance of an order.|Y
01|231959|10|1|A tariff surcharge may be added to this quotation in|Y
01|231959|10|2|the event of a sustained tariff increase on the|Y
01|231959|10|3|importation of this product.  Any surcharge will be|Y
01|231959|10|4|disclosed prior to acceptance of an order.|Y
01|231964|1|1|Universal Flexhead|Y
01|231964|1|2|Cat50 with UNC thread|Y
01|231964|1|3|ER40 (4.00-26.00mm) tooling interface|Y
01|231964|6|1|A tariff surcharge may be added to this quotation in|Y
01|231964|6|2|the event of a sustained tariff increase on the|Y
01|231964|6|3|importation of this product.  Any surcharge will be|Y
01|231964|6|4|disclosed prior to acceptance of an order.|Y
01|231965|2|1|P/N: NC5006-1500-2.25|Y
01|231965|2|2|Dual Contact CAT50 1.1/2 End Mill Holer Stub length|Y
01|231965|2|3|2.25 gauge length.|Y
01|231972|7|1|A tariff surcharge may be added to this quotation in|Y
01|231972|7|2|the event of a sustained tariff increase on the|Y
01|231972|7|3|importation of this product.  Any surcharge will be|Y
01|231972|7|4|disclosed prior to acceptance of an order.|Y
01|231974|2|1|A tariff surcharge may be added to this quotation in|Y
01|231974|2|2|the event of a sustained tariff increase on the|Y
01|231974|2|3|importation of this product.  Any surcharge will be|Y
01|231974|2|4|disclosed prior to acceptance of an order.|Y
01|231975|3|1|A tariff surcharge may be added to this quotation in|Y
01|231975|3|2|the event of a sustained tariff increase on the|Y
01|231975|3|3|importation of this product.  Any surcharge will be|Y
01|231975|3|4|disclosed prior to acceptance of an order.|Y
01|231978|1|1|**UPDATED 5/27/2025: Estimated lead time is end of|Y
01|231978|1|2|June/beginning of July**|Y
01|231978|7|1|A tariff surcharge may be added to this quotation in|Y
01|231978|7|2|the event of a sustained tariff increase on the|Y
01|231978|7|3|importation of this product.  Any surcharge will be|Y
01|231978|7|4|disclosed prior to acceptance of an order.|Y
01|231979|1|1|FOR OKUMA GENOS M560V P300 CONTROL|Y
01|231979|1|2|INSTALLATION SERVICES BY GOSIGER|Y
01|231979|3|1|10 equivalent|Y
01|231979|6|1|SPECIAL ORDER FACEPLATE ADAPTER|Y
01|231979|6|2|A2-5 OR A2-6 TO CNC260 FP W/ CENTER BORE PILOT|Y
01|231979|8|1|8 equivalent|Y
01|231979|11|1|SPECIAL ORDER FACEPLATE ADAPTER|Y
01|231979|11|2|A2-5 OR A2-6 TO CNC202 FP W/ CENTER BORE PILOT|Y
01|231982|13|1|A tariff surcharge may be added to this quotation in|Y
01|231982|13|2|the event of a sustained tariff increase on the|Y
01|231982|13|3|importation of this product.  Any surcharge will be|Y
01|231982|13|4|disclosed prior to acceptance of an order.|Y
01|231983|3|1|A tariff surcharge may be added to this quotation in|Y
01|231983|3|2|the event of a sustained tariff increase on the|Y
01|231983|3|3|importation of this product.  Any surcharge will be|Y
01|231983|3|4|disclosed prior to acceptance of an order.|Y
01|231985|2|1|A tariff surcharge may be added to this quotation in|Y
01|231985|2|2|the event of a sustained tariff increase on the|Y
01|231985|2|3|importation of this product.  Any surcharge will be|Y
01|231985|2|4|disclosed prior to acceptance of an order.|Y
01|231988|1|1|5C 2mm round collet|Y
01|231988|1|2|part# 520-002|Y
01|231988|3|1|5C 1/32round collet|Y
01|231988|3|2|part# 500-002|Y
01|231988|4|1|A tariff surcharge may be added to this quotation in|Y
01|231988|4|2|the event of a sustained tariff increase on the|Y
01|231988|4|3|importation of this product.  Any surcharge will be|Y
01|231988|4|4|disclosed prior to acceptance of an order.|Y
01|231990|1|1|TARIFF PRICING APPLIED|Y
01|231990|13|1|A tariff surcharge may be added to this quotation in|Y
01|231990|13|2|the event of a sustained tariff increase on the|Y
01|231990|13|3|importation of this product.  Any surcharge will be|Y
01|231990|13|4|disclosed prior to acceptance of an order.|Y
01|231992|2|1|A tariff surcharge may be added to this quotation in|Y
01|231992|2|2|the event of a sustained tariff increase on the|Y
01|231992|2|3|importation of this product.  Any surcharge will be|Y
01|231992|2|4|disclosed prior to acceptance of an order.|Y
01|231993|11|1|A tariff surcharge may be added to this quotation in|Y
01|231993|11|2|the event of a sustained tariff increase on the|Y
01|231993|11|3|importation of this product.  Any surcharge will be|Y
01|231993|11|4|disclosed prior to acceptance of an order.|Y
01|231995|1|1|Special IMTS end of year promotion.|Y
01|231995|3|1|CONFIRMATION SWITCHES/BRACKET/COVER FOR PB-105-2W|Y
01|231995|4|1|Robodrill spec|Y
01|231995|5|1|Robodrill  spec|Y
01|231996|2|1|A tariff surcharge may be added to this quotation in|Y
01|231996|2|2|the event of a sustained tariff increase on the|Y
01|231996|2|3|importation of this product.  Any surcharge will be|Y
01|231996|2|4|disclosed prior to acceptance of an order.|Y
01|232002|2|1|A tariff surcharge may be added to this quotation in|Y
01|232002|2|2|the event of a sustained tariff increase on the|Y
01|232002|2|3|importation of this product.  Any surcharge will be|Y
01|232002|2|4|disclosed prior to acceptance of an order.|Y
01|232003|5|1|special- included in price of purchase or RT|Y
01|232003|9|1|Special: Included in price of the purchase of RT.|Y
01|232003|9|2|Includes: AMP/Cables/Fiber Optic/Hardware/PRM/Travel &|Y
01|232003|9|3|Costs.|Y
01|232004|1|1|Honoring past orders of 12x HSK63A-MMC8C-107-AT-IDU|Y
01|232004|1|2|on quantity break pricing for Service Steel. Quote|Y
01|232004|1|3|reflects purchase of all 12 pieces in addition to 3|Y
01|232004|1|4|extra pieces on separate PO per conversation with Mike|Y
01|232004|1|5|and Steelville's other PO.|Y
01|232012|4|1|A tariff surcharge may be added to this quotation in|Y
01|232012|4|2|the event of a sustained tariff increase on the|Y
01|232012|4|3|importation of this product.  Any surcharge will be|Y
01|232012|4|4|disclosed prior to acceptance of an order.|Y
01|232017|3|1|A tariff surcharge may be added to this quotation in|Y
01|232017|3|2|the event of a sustained tariff increase on the|Y
01|232017|3|3|importation of this product.  Any surcharge will be|Y
01|232017|3|4|disclosed prior to acceptance of an order.|Y
01|232023|13|1|A tariff surcharge may be added to this quotation in|Y
01|232023|13|2|the event of a sustained tariff increase on the|Y
01|232023|13|3|importation of this product.  Any surcharge will be|Y
01|232023|13|4|disclosed prior to acceptance of an order.|Y
01|232036|2|1|A tariff surcharge may be added to this quotation in|Y
01|232036|2|2|the event of a sustained tariff increase on the|Y
01|232036|2|3|importation of this product.  Any surcharge will be|Y
01|232036|2|4|disclosed prior to acceptance of an order.|Y
01|232037|2|1|A tariff surcharge may be added to this quotation in|Y
01|232037|2|2|the event of a sustained tariff increase on the|Y
01|232037|2|3|importation of this product.  Any surcharge will be|Y
01|232037|2|4|disclosed prior to acceptance of an order.|Y
01|232042|1|1|P/N: 3-847-1600P|Y
01|232042|2|1|P/N: 3-884-316P|Y
01|232042|3|1|A tariff surcharge may be added to this quotation in|Y
01|232042|3|2|the event of a sustained tariff increase on the|Y
01|232042|3|3|importation of this product.  Any surcharge will be|Y
01|232042|3|4|disclosed prior to acceptance of an order.|Y
01|232043|5|1|A tariff surcharge may be added to this quotation in|Y
01|232043|5|2|the event of a sustained tariff increase on the|Y
01|232043|5|3|importation of this product.  Any surcharge will be|Y
01|232043|5|4|disclosed prior to acceptance of an order.|Y
01|232046|1|1|Part# 201121|Y
01|232046|1|2|Mazak VDI40 Live Capto C4 X<Radial>STRT Sub Offset|Y
01|232046|1|3|Int/Ext coolant|Y
01|232046|2|1|Part# 196993|Y
01|232046|2|2|Mazak VDI40 Live Capto C4 X<Radial>STRT Offset|Y
01|232046|2|3|Int/Ext coolant|Y
01|232046|7|1|Part# 196991|Y
01|232046|7|2|Mazak VDI40 Live Capto C4 Z<Axial>90D IntExtCool|Y
01|232046|9|1|Part#180103 ER32 angle unit 1:2 ICE|Y
01|232046|9|2|Item can not be cancelled or returned once PO received.|Y
01|232058|7|1|A tariff surcharge may be added to this quotation in|Y
01|232058|7|2|the event of a sustained tariff increase on the|Y
01|232058|7|3|importation of this product.  Any surcharge will be|Y
01|232058|7|4|disclosed prior to acceptance of an order.|Y
01|232059|2|1|2 free pots with purchase of START2 unit|Y
01|232063|11|1|A tariff surcharge may be added to this quotation in|Y
01|232063|11|2|the event of a sustained tariff increase on the|Y
01|232063|11|3|importation of this product.  Any surcharge will be|Y
01|232063|11|4|disclosed prior to acceptance of an order.|Y
01|232065|1|1|INCQ2505-0012 0001|Y
01|232067|1|1|No Inspection Required.|Y
01|232067|2|1|No Inspection Required.|Y
01|232067|3|1|No Inspection Required.|Y
01|232067|4|1|No Inspection Required.|Y
01|232067|5|1|No Inspection Required.|Y
01|232067|6|1|No Inspection Required.|Y
01|232067|7|1|No Inspection Required.|Y
01|232067|8|1|No Inspection Required.|Y
01|232067|9|1|No Inspection Required.|Y
01|232067|10|1|No Inspection Required.|Y
01|232068|1|1|RGA#TOR-61859/|Y
01|232068|1|2|Repair of SF-START2-UNIT-200 s/n: 2J7134|Y
01|232073|1|1|Pratt and Whitney part # (PT918706) to be etched on|Y
01|232073|1|2|tool and packaging.|Y
01|232076|10|1|A tariff surcharge may be added to this quotation in|Y
01|232076|10|2|the event of a sustained tariff increase on the|Y
01|232076|10|3|importation of this product.  Any surcharge will be|Y
01|232076|10|4|disclosed prior to acceptance of an order.|Y
01|232079|28|1|A tariff surcharge may be added to this quotation in|Y
01|232079|28|2|the event of a sustained tariff increase on the|Y
01|232079|28|3|importation of this product.  Any surcharge will be|Y
01|232079|28|4|disclosed prior to acceptance of an order.|Y
01|232080|28|1|A tariff surcharge may be added to this quotation in|Y
01|232080|28|2|the event of a sustained tariff increase on the|Y
01|232080|28|3|importation of this product.  Any surcharge will be|Y
01|232080|28|4|disclosed prior to acceptance of an order.|Y
01|232089|2|1|A tariff surcharge may be added to this quotation in|Y
01|232089|2|2|the event of a sustained tariff increase on the|Y
01|232089|2|3|importation of this product.  Any surcharge will be|Y
01|232089|2|4|disclosed prior to acceptance of an order.|Y
01|232093|1|1|RGA#LVR-61879/|Y
01|232093|1|2|Repair of MZQT47-ER32X-OFF s/n: 81241 06|Y
01|232093|1|3|(Mimatic#124034)|Y
01|232102|2|1|A tariff surcharge may be added to this quotation in|Y
01|232102|2|2|the event of a sustained tariff increase on the|Y
01|232102|2|3|importation of this product.  Any surcharge will be|Y
01|232102|2|4|disclosed prior to acceptance of an order.|Y
01|232103|1|1|CAT40-SF0125-6.30-IDU|Y
01|232103|2|1|CAT40-SF0250-5.12CP-IDU|Y
01|232103|3|1|CAT40-SF0500-3.15CP-IDU|Y
01|232103|4|1|CAT50-SF0125-6.30-IDU|Y
01|232103|5|1|CAT50-SF0250-5.12CP-IDU|Y
01|232103|6|1|CAT50-SF0500-3.15CP-IDU|Y
01|232103|7|1|Chip Hole & re-balance to 12K|Y
01|232103|8|1|A tariff surcharge may be added to this quotation in|Y
01|232103|8|2|the event of a sustained tariff increase on the|Y
01|232103|8|3|importation of this product.  Any surcharge will be|Y
01|232103|8|4|disclosed prior to acceptance of an order.|Y
01|232105|2|1|A tariff surcharge may be added to this quotation in|Y
01|232105|2|2|the event of a sustained tariff increase on the|Y
01|232105|2|3|importation of this product.  Any surcharge will be|Y
01|232105|2|4|disclosed prior to acceptance of an order.|Y
01|232109|2|1|A tariff surcharge may be added to this quotation in|Y
01|232109|2|2|the event of a sustained tariff increase on the|Y
01|232109|2|3|importation of this product.  Any surcharge will be|Y
01|232109|2|4|disclosed prior to acceptance of an order.|Y
01|232116|2|1|A tariff surcharge may be added to this quotation in|Y
01|232116|2|2|the event of a sustained tariff increase on the|Y
01|232116|2|3|importation of this product.  Any surcharge will be|Y
01|232116|2|4|disclosed prior to acceptance of an order.|Y
01|232121|4|1|A tariff surcharge may be added to this quotation in|Y
01|232121|4|2|the event of a sustained tariff increase on the|Y
01|232121|4|3|importation of this product.  Any surcharge will be|Y
01|232121|4|4|disclosed prior to acceptance of an order.|Y
01|232123|18|1|A tariff surcharge may be added to this quotation in|Y
01|232123|18|2|the event of a sustained tariff increase on the|Y
01|232123|18|3|importation of this product.  Any surcharge will be|Y
01|232123|18|4|disclosed prior to acceptance of an order.|Y
01|232124|2|1|A tariff surcharge may be added to this quotation in|Y
01|232124|2|2|the event of a sustained tariff increase on the|Y
01|232124|2|3|importation of this product.  Any surcharge will be|Y
01|232124|2|4|disclosed prior to acceptance of an order.|Y
01|232125|3|1|Final Sale-Special discount at NET pricing|Y
01|232125|4|1|A tariff surcharge may be added to this quotation in|Y
01|232125|4|2|the event of a sustained tariff increase on the|Y
01|232125|4|3|importation of this product.  Any surcharge will be|Y
01|232125|4|4|disclosed prior to acceptance of an order.|Y
01|232128|11|1|A tariff surcharge may be added to this quotation in|Y
01|232128|11|2|the event of a sustained tariff increase on the|Y
01|232128|11|3|importation of this product.  Any surcharge will be|Y
01|232128|11|4|disclosed prior to acceptance of an order.|Y
01|232129|1|1|RGA#LVR-61873/|Y
01|232129|1|2|Repair of MZQT47-ER32Z s/n:59661 03 (Mimatic#124635)|Y
01|232129|2|1|Bearings seals and o-rings to be replaced|Y
01|232129|3|1|A tariff surcharge may be added to this quotation in|Y
01|232129|3|2|the event of a sustained tariff increase on the|Y
01|232129|3|3|importation of this product.  Any surcharge will be|Y
01|232129|3|4|disclosed prior to acceptance of an order.|Y
01|232130|1|1|Includes motors and cable sets.|Y
01|232130|3|1|A tariff surcharge may be added to this quotation in|Y
01|232130|3|2|the event of a sustained tariff increase on the|Y
01|232130|3|3|importation of this product.  Any surcharge will be|Y
01|232130|3|4|disclosed prior to acceptance of an order.|Y
01|232131|1|1|INCLUDES POWER/FEEDBACK CABLES FROM RT TO BULKHEAD|Y
01|232133|7|1|Save an extra 10% on spring cleaning!|Y
01|232133|7|2|Get rid of those old test blanks and step up to a|Y
01|232133|7|3|true test bar flange-less for 360* orientation.|Y
01|232133|7|4|Allowing for proper spindle diagnosis|Y
01|232134|7|1|Save an extra 10% on spring cleaning!|Y
01|232134|7|2|Get rid of those old test blanks and step up to a|Y
01|232134|7|3|true test bar flange-less for 360* orientation.|Y
01|232134|7|4|Allowing for proper spindle diagnosis|Y
01|232135|1|1|NCAT40-SK10F-120UP-IDU-M|Y
01|232135|1|2|NCAT40 Slim Chuck SK10 HiSpeed DIN ChipHole_Mod 30K|Y
01|232135|1|3|Taper Plus.|Y
01|232135|1|4|Tariff Code: 8466.10.0175 / Country of Origin Japan|Y
01|232135|2|1|Quoted at NET price.|Y
01|232135|3|1|Tariff Code: 8204.11.0060|Y
01|232135|3|2|Country of Origin: Japan|Y
01|232137|2|1|A tariff surcharge may be added to this quotation in|Y
01|232137|2|2|the event of a sustained tariff increase on the|Y
01|232137|2|3|importation of this product.  Any surcharge will be|Y
01|232137|2|4|disclosed prior to acceptance of an order.|Y
01|232140|6|1|A tariff surcharge may be added to this quotation in|Y
01|232140|6|2|the event of a sustained tariff increase on the|Y
01|232140|6|3|importation of this product.  Any surcharge will be|Y
01|232140|6|4|disclosed prior to acceptance of an order.|Y
01|232145|1|1|RGA#TAR-61864|Y
01|232145|1|2|5AX-2002OSP3-M|Y
01|232145|1|3|SN:2320|Y
01|232145|2|1|CUSTOMER TABLE RETURN|Y
01|232145|2|2|RGA#TAR-61864|Y
01|232145|2|3|5AX-2002OSP3-M SN:2320|Y
01|232146|12|1|A tariff surcharge may be added to this quotation in|Y
01|232146|12|2|the event of a sustained tariff increase on the|Y
01|232146|12|3|importation of this product.  Any surcharge will be|Y
01|232146|12|4|disclosed prior to acceptance of an order.|Y
01|232147|3|1|includes power/feedback cables servo amp install travel|Y
01|232152|2|1|A tariff surcharge may be added to this quotation in|Y
01|232152|2|2|the event of a sustained tariff increase on the|Y
01|232152|2|3|importation of this product.  Any surcharge will be|Y
01|232152|2|4|disclosed prior to acceptance of an order.|Y
01|232153|4|1|A tariff surcharge may be added to this quotation in|Y
01|232153|4|2|the event of a sustained tariff increase on the|Y
01|232153|4|3|importation of this product.  Any surcharge will be|Y
01|232153|4|4|disclosed prior to acceptance of an order.|Y
01|232156|1|1|Special net price.|Y
01|232156|3|1|A tariff surcharge may be added to this quotation in|Y
01|232156|3|2|the event of a sustained tariff increase on the|Y
01|232156|3|3|importation of this product.  Any surcharge will be|Y
01|232156|3|4|disclosed prior to acceptance of an order.|Y
01|232157|3|1|includes power/feedback cables servo amp install travel|Y
01|232159|8|1|Oil Chiller with hoses AKZ149-T|Y
01|232161|2|1|A tariff surcharge may be added to this quotation in|Y
01|232161|2|2|the event of a sustained tariff increase on the|Y
01|232161|2|3|importation of this product.  Any surcharge will be|Y
01|232161|2|4|disclosed prior to acceptance of an order.|Y
01|232162|3|1|includes power/feedback cables servo amp install travel|Y
01|232164|1|1|Includes air/hyd booster|Y
01|232164|2|1|Includes: Drive unit short bar fiber optic cable|Y
01|232164|2|2|communications cable bulkhead cables external cables|Y
01|232164|2|3|parameter changes service time and travel.|Y
01|232164|3|1|A tariff surcharge may be added to this quotation in|Y
01|232164|3|2|the event of a sustained tariff increase on the|Y
01|232164|3|3|importation of this product.  Any surcharge will be|Y
01|232164|3|4|disclosed prior to acceptance of an order.|Y
01|232168|2|1|Installation includes: Dual axis drive short bar|Y
01|232168|2|2|fiber optic cables communications cablesbulkhead|Y
01|232168|2|3|cables external cables parameter changes service|Y
01|232168|2|4|time and travel and Fanuc software option.|Y
01|232168|2|5|Installation quoted at NET price.|Y
01|232169|1|1|Placeholder for HSK63A-FMH22-47-45 - TNKQ2505-0224 0001|Y
01|232169|3|1|Placeholder for BT30-FMH22-47-45 - TNKQ2505-0224 0002|Y
01|232169|5|1|Placeholder for BT40-FMH22-47-45 - TNKQ2505-0224 0003|Y
01|232169|7|1|TNKQ2505-0224 0004|Y
01|232169|8|1|A tariff surcharge may be added to this quotation in|Y
01|232169|8|2|the event of a sustained tariff increase on the|Y
01|232169|8|3|importation of this product.  Any surcharge will be|Y
01|232169|8|4|disclosed prior to acceptance of an order.|Y
01|232174|2|1|A tariff surcharge may be added to this quotation in|Y
01|232174|2|2|the event of a sustained tariff increase on the|Y
01|232174|2|3|importation of this product.  Any surcharge will be|Y
01|232174|2|4|disclosed prior to acceptance of an order.|Y
01|232176|1|1|Tariff Code: 9031.80.8085/country of Origin: Japan|Y
01|232176|2|1|Tariff Code: 9031.80.8085/country of Origin: Japan|Y
01|232176|3|1|A tariff surcharge may be added to this quotation in|Y
01|232176|3|2|the event of a sustained tariff increase on the|Y
01|232176|3|3|importation of this product.  Any surcharge will be|Y
01|232176|3|4|disclosed prior to acceptance of an order.|Y
01|232178|4|1|A tariff surcharge may be added to this quotation in|Y
01|232178|4|2|the event of a sustained tariff increase on the|Y
01|232178|4|3|importation of this product.  Any surcharge will be|Y
01|232178|4|4|disclosed prior to acceptance of an order.|Y
01|232183|2|1|Quoted at NEt price.|Y
01|232183|3|1|A tariff surcharge may be added to this quotation in|Y
01|232183|3|2|the event of a sustained tariff increase on the|Y
01|232183|3|3|importation of this product.  Any surcharge will be|Y
01|232183|3|4|disclosed prior to acceptance of an order.|Y
01|232185|2|1|A tariff surcharge may be added to this quotation in|Y
01|232185|2|2|the event of a sustained tariff increase on the|Y
01|232185|2|3|importation of this product.  Any surcharge will be|Y
01|232185|2|4|disclosed prior to acceptance of an order.|Y
01|232188|5|1|A tariff surcharge may be added to this quotation in|Y
01|232188|5|2|the event of a sustained tariff increase on the|Y
01|232188|5|3|importation of this product.  Any surcharge will be|Y
01|232188|5|4|disclosed prior to acceptance of an order.|Y
01|232190|2|1|A tariff surcharge may be added to this quotation in|Y
01|232190|2|2|the event of a sustained tariff increase on the|Y
01|232190|2|3|importation of this product.  Any surcharge will be|Y
01|232190|2|4|disclosed prior to acceptance of an order.|Y
01|232195|2|1|A tariff surcharge may be added to this quotation in|Y
01|232195|2|2|the event of a sustained tariff increase on the|Y
01|232195|2|3|importation of this product.  Any surcharge will be|Y
01|232195|2|4|disclosed prior to acceptance of an order.|Y
01|232206|8|1|A tariff surcharge may be added to this quotation in|Y
01|232206|8|2|the event of a sustained tariff increase on the|Y
01|232206|8|3|importation of this product.  Any surcharge will be|Y
01|232206|8|4|disclosed prior to acceptance of an order.|Y
01|232211|6|1|A tariff surcharge may be added to this quotation in|Y
01|232211|6|2|the event of a sustained tariff increase on the|Y
01|232211|6|3|importation of this product.  Any surcharge will be|Y
01|232211|6|4|disclosed prior to acceptance of an order.|Y
01|232212|10|1|*8 Pcs Total in stock - all sales final.|Y
01|232214|8|1|CAT40-MMC12C-120U-AA-IDU|Y
01|232214|41|1|A tariff surcharge may be added to this quotation in|Y
01|232214|41|2|the event of a sustained tariff increase on the|Y
01|232214|41|3|importation of this product.  Any surcharge will be|Y
01|232214|41|4|disclosed prior to acceptance of an order.|Y
01|232215|1|1|Estimated Lead Time is mid/end June.|Y
01|232218|6|1|A tariff surcharge may be added to this quotation in|Y
01|232218|6|2|the event of a sustained tariff increase on the|Y
01|232218|6|3|importation of this product.  Any surcharge will be|Y
01|232218|6|4|disclosed prior to acceptance of an order.|Y
01|232223|5|1|A tariff surcharge may be added to this quotation in|Y
01|232223|5|2|the event of a sustained tariff increase on the|Y
01|232223|5|3|importation of this product.  Any surcharge will be|Y
01|232223|5|4|disclosed prior to acceptance of an order.|Y
01|232226|2|1|A tariff surcharge may be added to this quotation in|Y
01|232226|2|2|the event of a sustained tariff increase on the|Y
01|232226|2|3|importation of this product.  Any surcharge will be|Y
01|232226|2|4|disclosed prior to acceptance of an order.|Y
01|232229|1|1|PRICE REMOVES RT CABLES AS THESE ARE ALREADY SUPPLIED|Y
01|232229|1|2|WITH EXISTING TABLE|Y
01|232229|1|3|FOR YAMA SEIKI VP-2016 BRIDGE MILL|Y
01|232229|1|4|PLC LADDER MODIFICATION BY OTHERS...|Y
01|232229|1|5|MODIFICATION IS REQUIRED PRIOR TO INSTALLATION|Y
01|232229|3|1|SPECIAL PAYMENT TERMS|Y
01|232229|3|2|50% DOWN; REMAINDER NET DUE AFTER INSTALLATION|Y
01|232232|2|1|Installation includes: Drive unit short bar fiber|Y
01|232232|2|2|optic cables communications cable bulkhead cables|Y
01|232232|2|3|external cables parameter changes service time and|Y
01|232232|2|4|travel.|Y
01|232237|15|1|EXTRA 10% OFF APPLIED|Y
01|232238|23|1|A tariff surcharge may be added to this quotation in|Y
01|232238|23|2|the event of a sustained tariff increase on the|Y
01|232238|23|3|importation of this product.  Any surcharge will be|Y
01|232238|23|4|disclosed prior to acceptance of an order.|Y
01|232239|2|1|Quoted at NET price.|Y
01|232239|2|2|BIS-C-122-04/L Customer Balluff Chip|Y
01|232242|2|1|A tariff surcharge may be added to this quotation in|Y
01|232242|2|2|the event of a sustained tariff increase on the|Y
01|232242|2|3|importation of this product.  Any surcharge will be|Y
01|232242|2|4|disclosed prior to acceptance of an order.|Y
01|232247|7|1|A tariff surcharge may be added to this quotation in|Y
01|232247|7|2|the event of a sustained tariff increase on the|Y
01|232247|7|3|importation of this product.  Any surcharge will be|Y
01|232247|7|4|disclosed prior to acceptance of an order.|Y
01|232251|2|1|LN to make block after receipt of spindle measurements|Y
01|232251|2|2|**Cannot be cancelled or returned**|Y
01|232251|3|1|A tariff surcharge may be added to this quotation in|Y
01|232251|3|2|the event of a sustained tariff increase on the|Y
01|232251|3|3|importation of this product.  Any surcharge will be|Y
01|232251|3|4|disclosed prior to acceptance of an order.|Y
01|232256|2|1|A tariff surcharge may be added to this quotation in|Y
01|232256|2|2|the event of a sustained tariff increase on the|Y
01|232256|2|3|importation of this product.  Any surcharge will be|Y
01|232256|2|4|disclosed prior to acceptance of an order.|Y
01|232259|5|1|Please note: Above collets are on our Overstock list|Y
01|232259|5|2|so I am able to offer 54% off. We do not offer these in|Y
01|232259|5|3|coolant thru and they are non-returnable. Thank you|Y
01|232259|6|1|A tariff surcharge may be added to this quotation in|Y
01|232259|6|2|the event of a sustained tariff increase on the|Y
01|232259|6|3|importation of this product.  Any surcharge will be|Y
01|232259|6|4|disclosed prior to acceptance of an order.|Y
01|232263|2|1|#4: Wedge Plunger for H3KS6|Y
01|232263|2|2|Net price For Maya tools|Y
01|232263|2|3|Non cancelable Non returnable|Y
01|232263|3|1|#10: Master Jaw Set for H3KS6 (3pcs)|Y
01|232263|3|2|Net Price for Maya Tools|Y
01|232263|3|3|Non returnable Non cancelable|Y
01|232274|2|1|A tariff surcharge may be added to this quotation in|Y
01|232274|2|2|the event of a sustained tariff increase on the|Y
01|232274|2|3|importation of this product.  Any surcharge will be|Y
01|232274|2|4|disclosed prior to acceptance of an order.|Y
01|232276|24|1|A tariff surcharge may be added to this quotation in|Y
01|232276|24|2|the event of a sustained tariff increase on the|Y
01|232276|24|3|importation of this product.  Any surcharge will be|Y
01|232276|24|4|disclosed prior to acceptance of an order.|Y
01|232280|6|1|A tariff surcharge may be added to this quotation in|Y
01|232280|6|2|the event of a sustained tariff increase on the|Y
01|232280|6|3|importation of this product.  Any surcharge will be|Y
01|232280|6|4|disclosed prior to acceptance of an order.|Y
01|232283|1|1|Please note these are quoted at special net price.|Y
01|232283|1|2|Once PO has been issued these items cannot be|Y
01|232283|1|3|cancelled or returned.|Y
01|232283|3|1|Please note these are quoted at special net price.|Y
01|232283|3|2|Once PO has been issued these items cannot be|Y
01|232283|3|3|cancelled or returned.|Y
01|232285|1|1|Lyndex-Nikken Part Number TBD|Y
01|232285|1|2|NET price reflects a minimum order of 2 heads.|Y
01|232285|4|1|Quoted at NET price.|Y
01|232285|5|1|A tariff surcharge may be added to this quotation in|Y
01|232285|5|2|the event of a sustained tariff increase on the|Y
01|232285|5|3|importation of this product.  Any surcharge will be|Y
01|232285|5|4|disclosed prior to acceptance of an order.|Y
01|232287|2|1|A tariff surcharge may be added to this quotation in|Y
01|232287|2|2|the event of a sustained tariff increase on the|Y
01|232287|2|3|importation of this product.  Any surcharge will be|Y
01|232287|2|4|disclosed prior to acceptance of an order.|Y
01|232290|6|1|A tariff surcharge may be added to this quotation in|Y
01|232290|6|2|the event of a sustained tariff increase on the|Y
01|232290|6|3|importation of this product.  Any surcharge will be|Y
01|232290|6|4|disclosed prior to acceptance of an order.|Y
01|232296|1|1|Please allow 8 weeks for manufacturing plus 2 weeks for|Y
01|232296|1|2|delivery into warehouse. These have been quoted at a|Y
01|232296|1|3|special net price & pricing reflects PO for 12 pieces.|Y
01|232296|2|1|A tariff surcharge may be added to this quotation in|Y
01|232296|2|2|the event of a sustained tariff increase on the|Y
01|232296|2|3|importation of this product.  Any surcharge will be|Y
01|232296|2|4|disclosed prior to acceptance of an order.|Y
01|232298|3|1|A tariff surcharge of 8% will be added to every order|Y
01|232298|3|2|placed after September 1st 2025(until further notice).|Y
01|232298|3|3|This surcharge will be acknowledged upon acceptance|Y
01|232298|3|4|of every order.|Y
01|232302|2|1|A tariff surcharge may be added to this quotation in|Y
01|232302|2|2|the event of a sustained tariff increase on the|Y
01|232302|2|3|importation of this product.  Any surcharge will be|Y
01|232302|2|4|disclosed prior to acceptance of an order.|Y
01|232303|1|1|CAT50-ER32-6.00DIN-M|Y
01|232303|3|1|A tariff surcharge may be added to this quotation in|Y
01|232303|3|2|the event of a sustained tariff increase on the|Y
01|232303|3|3|importation of this product.  Any surcharge will be|Y
01|232303|3|4|disclosed prior to acceptance of an order.|Y
01|232308|3|1|A tariff surcharge may be added to this quotation in|Y
01|232308|3|2|the event of a sustained tariff increase on the|Y
01|232308|3|3|importation of this product.  Any surcharge will be|Y
01|232308|3|4|disclosed prior to acceptance of an order.|Y
01|232315|4|1|A tariff surcharge may be added to this quotation in|Y
01|232315|4|2|the event of a sustained tariff increase on the|Y
01|232315|4|3|importation of this product.  Any surcharge will be|Y
01|232315|4|4|disclosed prior to acceptance of an order.|Y
01|232317|4|1|A tariff surcharge may be added to this quotation in|Y
01|232317|4|2|the event of a sustained tariff increase on the|Y
01|232317|4|3|importation of this product.  Any surcharge will be|Y
01|232317|4|4|disclosed prior to acceptance of an order.|Y
01|232318|7|1|A tariff surcharge may be added to this quotation in|Y
01|232318|7|2|the event of a sustained tariff increase on the|Y
01|232318|7|3|importation of this product.  Any surcharge will be|Y
01|232318|7|4|disclosed prior to acceptance of an order.|Y
01|232322|17|1|A tariff surcharge may be added to this quotation in|Y
01|232322|17|2|the event of a sustained tariff increase on the|Y
01|232322|17|3|importation of this product.  Any surcharge will be|Y
01|232322|17|4|disclosed prior to acceptance of an order.|Y
01|232326|6|1|**NO SAFETY RECESS.  BODY MAY INTERFERE WITH ATC ARM**|Y
01|232330|2|1|Quoted at NET price and non-returnable.|Y
01|232334|1|1|Waiting on 160-042 (21/32) & 160-060 (15/16) pieces.|Y
01|232337|1|1|Special non-standard stock. Cannot be cancelled or|Y
01|232337|1|2|returned upon receipt of PO.|Y
01|232337|2|1|Special non-standard stock. Cannot be cancelled or|Y
01|232337|2|2|returned upon receipt of PO.|Y
01|232337|3|1|A tariff surcharge of 8% will be added to every order|Y
01|232337|3|2|placed after September 1st 2025(until further notice).|Y
01|232337|3|3|This surcharge will be acknowledged upon acceptance|Y
01|232337|3|4|of every order.|Y
01|232341|7|1|A tariff surcharge may be added to this quotation in|Y
01|232341|7|2|the event of a sustained tariff increase on the|Y
01|232341|7|3|importation of this product.  Any surcharge will be|Y
01|232341|7|4|disclosed prior to acceptance of an order.|Y
01|232342|2|1|A tariff surcharge may be added to this quotation in|Y
01|232342|2|2|the event of a sustained tariff increase on the|Y
01|232342|2|3|importation of this product.  Any surcharge will be|Y
01|232342|2|4|disclosed prior to acceptance of an order.|Y
01|232343|1|1|TNKQ2505-0356 0001|Y
01|232343|2|1|A tariff surcharge may be added to this quotation in|Y
01|232343|2|2|the event of a sustained tariff increase on the|Y
01|232343|2|3|importation of this product.  Any surcharge will be|Y
01|232343|2|4|disclosed prior to acceptance of an order.|Y
01|232348|5|1|A tariff surcharge may be added to this quotation in|Y
01|232348|5|2|the event of a sustained tariff increase on the|Y
01|232348|5|3|importation of this product.  Any surcharge will be|Y
01|232348|5|4|disclosed prior to acceptance of an order.|Y
01|232352|2|1|A tariff surcharge may be added to this quotation in|Y
01|232352|2|2|the event of a sustained tariff increase on the|Y
01|232352|2|3|importation of this product.  Any surcharge will be|Y
01|232352|2|4|disclosed prior to acceptance of an order.|Y
01|232353|4|1|A tariff surcharge may be added to this quotation in|Y
01|232353|4|2|the event of a sustained tariff increase on the|Y
01|232353|4|3|importation of this product.  Any surcharge will be|Y
01|232353|4|4|disclosed prior to acceptance of an order.|Y
01|232354|6|1|A tariff surcharge may be added to this quotation in|Y
01|232354|6|2|the event of a sustained tariff increase on the|Y
01|232354|6|3|importation of this product.  Any surcharge will be|Y
01|232354|6|4|disclosed prior to acceptance of an order.|Y
01|232355|15|1|A tariff surcharge may be added to this quotation in|Y
01|232355|15|2|the event of a sustained tariff increase on the|Y
01|232355|15|3|importation of this product.  Any surcharge will be|Y
01|232355|15|4|disclosed prior to acceptance of an order.|Y
01|232356|2|1|A tariff surcharge may be added to this quotation in|Y
01|232356|2|2|the event of a sustained tariff increase on the|Y
01|232356|2|3|importation of this product.  Any surcharge will be|Y
01|232356|2|4|disclosed prior to acceptance of an order.|Y
01|232357|16|1|A tariff surcharge may be added to this quotation in|Y
01|232357|16|2|the event of a sustained tariff increase on the|Y
01|232357|16|3|importation of this product.  Any surcharge will be|Y
01|232357|16|4|disclosed prior to acceptance of an order.|Y
01|232359|3|1|Will be BR3 motors for Xd1 R450.|Y
01|232359|6|1|A tariff surcharge may be added to this quotation in|Y
01|232359|6|2|the event of a sustained tariff increase on the|Y
01|232359|6|3|importation of this product.  Any surcharge will be|Y
01|232359|6|4|disclosed prior to acceptance of an order.|Y
01|232360|4|1|A tariff surcharge may be added to this quotation in|Y
01|232360|4|2|the event of a sustained tariff increase on the|Y
01|232360|4|3|importation of this product.  Any surcharge will be|Y
01|232360|4|4|disclosed prior to acceptance of an order.|Y
01|232362|8|1|A tariff surcharge may be added to this quotation in|Y
01|232362|8|2|the event of a sustained tariff increase on the|Y
01|232362|8|3|importation of this product.  Any surcharge will be|Y
01|232362|8|4|disclosed prior to acceptance of an order.|Y
01|232364|1|1|AR8-05 Collets 0.5~0.3|Y
01|232364|1|2|Please Note: This collet is non standard stock. Once|Y
01|232364|1|3|an order is placed it cannot be cancelled or returned.|Y
01|232364|4|1|A tariff surcharge may be added to this quotation in|Y
01|232364|4|2|the event of a sustained tariff increase on the|Y
01|232364|4|3|importation of this product.  Any surcharge will be|Y
01|232364|4|4|disclosed prior to acceptance of an order.|Y
01|232366|24|1|A tariff surcharge may be added to this quotation in|Y
01|232366|24|2|the event of a sustained tariff increase on the|Y
01|232366|24|3|importation of this product.  Any surcharge will be|Y
01|232366|24|4|disclosed prior to acceptance of an order.|Y
01|232368|2|1|A tariff surcharge may be added to this quotation in|Y
01|232368|2|2|the event of a sustained tariff increase on the|Y
01|232368|2|3|importation of this product.  Any surcharge will be|Y
01|232368|2|4|disclosed prior to acceptance of an order.|Y
01|232369|2|1|A tariff surcharge may be added to this quotation in|Y
01|232369|2|2|the event of a sustained tariff increase on the|Y
01|232369|2|3|importation of this product.  Any surcharge will be|Y
01|232369|2|4|disclosed prior to acceptance of an order.|Y
01|232375|8|1|A tariff surcharge may be added to this quotation in|Y
01|232375|8|2|the event of a sustained tariff increase on the|Y
01|232375|8|3|importation of this product.  Any surcharge will be|Y
01|232375|8|4|disclosed prior to acceptance of an order.|Y
01|232377|7|1|A tariff surcharge may be added to this quotation in|Y
01|232377|7|2|the event of a sustained tariff increase on the|Y
01|232377|7|3|importation of this product.  Any surcharge will be|Y
01|232377|7|4|disclosed prior to acceptance of an order.|Y
01|232379|2|1|A tariff surcharge may be added to this quotation in|Y
01|232379|2|2|the event of a sustained tariff increase on the|Y
01|232379|2|3|importation of this product.  Any surcharge will be|Y
01|232379|2|4|disclosed prior to acceptance of an order.|Y
01|232383|2|1|A tariff surcharge may be added to this quotation in|Y
01|232383|2|2|the event of a sustained tariff increase on the|Y
01|232383|2|3|importation of this product.  Any surcharge will be|Y
01|232383|2|4|disclosed prior to acceptance of an order.|Y
01|232384|5|1|A tariff surcharge may be added to this quotation in|Y
01|232384|5|2|the event of a sustained tariff increase on the|Y
01|232384|5|3|importation of this product.  Any surcharge will be|Y
01|232384|5|4|disclosed prior to acceptance of an order.|Y
01|232385|1|1|Quoted at NET price.|Y
01|232388|5|1|A tariff surcharge may be added to this quotation in|Y
01|232388|5|2|the event of a sustained tariff increase on the|Y
01|232388|5|3|importation of this product.  Any surcharge will be|Y
01|232388|5|4|disclosed prior to acceptance of an order.|Y
01|232391|46|1|A tariff surcharge may be added to this quotation in|Y
01|232391|46|2|the event of a sustained tariff increase on the|Y
01|232391|46|3|importation of this product.  Any surcharge will be|Y
01|232391|46|4|disclosed prior to acceptance of an order.|Y
01|232393|3|1|A tariff surcharge may be added to this quotation in|Y
01|232393|3|2|the event of a sustained tariff increase on the|Y
01|232393|3|3|importation of this product.  Any surcharge will be|Y
01|232393|3|4|disclosed prior to acceptance of an order.|Y
01|232394|6|1|Self contained 16c dead lenght collet closer|Y
01|232394|7|1|Riser for TAT-105|Y
01|232395|1|1|ETA is End of May/Beginning of June.|Y
01|232395|7|1|A tariff surcharge may be added to this quotation in|Y
01|232395|7|2|the event of a sustained tariff increase on the|Y
01|232395|7|3|importation of this product.  Any surcharge will be|Y
01|232395|7|4|disclosed prior to acceptance of an order.|Y
01|232398|3|1|Item qualifies for OVERSTOCK promoadditional 20% has|Y
01|232398|3|2|been added to the standard 30% discount|Y
01|232400|1|1|RGA#LVR-61893/|Y
01|232400|1|2|Repair of MNL12-ER32Z-MS-10K s/n: A0051|Y
01|232400|1|3|(Alps# MSA01-3W000S)|Y
01|232400|2|1|Bearings o-rings collet nuts and spindle to be|Y
01|232400|2|2|replaced.|Y
01|232400|3|1|A tariff surcharge may be added to this quotation in|Y
01|232400|3|2|the event of a sustained tariff increase on the|Y
01|232400|3|3|importation of this product.  Any surcharge will be|Y
01|232400|3|4|disclosed prior to acceptance of an order.|Y
01|232403|2|1|A tariff surcharge may be added to this quotation in|Y
01|232403|2|2|the event of a sustained tariff increase on the|Y
01|232403|2|3|importation of this product.  Any surcharge will be|Y
01|232403|2|4|disclosed prior to acceptance of an order.|Y
01|232412|4|1|A tariff surcharge may be added to this quotation in|Y
01|232412|4|2|the event of a sustained tariff increase of the|Y
01|232412|4|3|importation of this product. Any surcharge will be|Y
01|232412|4|4|disclosed prior to the acceptance of an order.|Y
01|232414|3|1|A tariff surcharge may be added to this quotation in|Y
01|232414|3|2|the event of a sustained tariff increase on the|Y
01|232414|3|3|importation of this product.  Any surcharge will be|Y
01|232414|3|4|disclosed prior to acceptance of an order.|Y
01|232415|5|1|Includes New Servo Driver appropiate|Y
01|232415|5|2|for Rotary Table CNC180FA-M|Y
01|232415|6|1|A tariff surcharge may be added to this quotation in|Y
01|232415|6|2|the event of a sustained tariff increase on the|Y
01|232415|6|3|importation of this product.  Any surcharge will be|Y
01|232415|6|4|disclosed prior to acceptance of an order.|Y
01|232419|2|1|A tariff surcharge may be added to this quotation in|Y
01|232419|2|2|the event of a sustained tariff increase on the|Y
01|232419|2|3|importation of this product.  Any surcharge will be|Y
01|232419|2|4|disclosed prior to acceptance of an order.|Y
01|232423|7|1|A tariff surcharge may be added to this quotation in|Y
01|232423|7|2|the event of a sustained tariff increase on the|Y
01|232423|7|3|importation of this product.  Any surcharge will be|Y
01|232423|7|4|disclosed prior to acceptance of an order.|Y
01|232426|7|1|A tariff surcharge may be added to this quotation in|Y
01|232426|7|2|the event of a sustained tariff increase on the|Y
01|232426|7|3|importation of this product.  Any surcharge will be|Y
01|232426|7|4|disclosed prior to acceptance of an order.|Y
01|232427|1|1|RGA#LVR-61785/|Y
01|232427|1|2|Repair of MZQT5-CT40Z-ICE s/n: 18902195 02|Y
01|232427|1|3|(Mimatic#103667)|Y
01|232427|2|1|Bearings seals o-rings damaged input & output|Y
01|232427|2|2|spindles to be replaced.|Y
01|232427|4|1|RGA#LVR-61785/|Y
01|232427|4|2|Repair of MZQT5-CT40Z-ICE s/n:98029 04 (Mimatic#103667)|Y
01|232427|5|1|Bearings seals o-rings damaged input & output|Y
01|232427|5|2|spindle to be replaced.|Y
01|232429|2|1|A tariff surcharge may be added to this quotation in|Y
01|232429|2|2|the event of a sustained tariff increase on the|Y
01|232429|2|3|importation of this product.  Any surcharge will be|Y
01|232429|2|4|disclosed prior to acceptance of an order.|Y
01|232430|1|1|**Price valid for 21 pcs only. Should quantities|Y
01|232430|1|2|change please resubmit for quote.**|Y
01|232431|4|1|A tariff surcharge may be added to this quotation in|Y
01|232431|4|2|the event of a sustained tariff increase on the|Y
01|232431|4|3|importation of this product.  Any surcharge will be|Y
01|232431|4|4|disclosed prior to acceptance of an order.|Y
01|232435|29|1|A tariff surcharge may be added to this quotation in|Y
01|232435|29|2|the event of a sustained tariff increase on the|Y
01|232435|29|3|importation of this product.  Any surcharge will be|Y
01|232435|29|4|disclosed prior to acceptance of an order.|Y
01|232437|5|1|A tariff surcharge may be added to this quotation in|Y
01|232437|5|2|the event of a sustained tariff increase on the|Y
01|232437|5|3|importation of this product.  Any surcharge will be|Y
01|232437|5|4|disclosed prior to acceptance of an order.|Y
01|232438|1|1|RGA#LVR-61879/|Y
01|232438|1|2|Repair of MZQT47-ER32X-OFF s/n: 81241 06|Y
01|232438|1|3|(Mimatic#124034)|Y
01|232438|2|1|Bearings seals and o-rings to be replaced.|Y
01|232443|2|1|A tariff surcharge may be added to this quotation in|Y
01|232443|2|2|the event of a sustained tariff increase on the|Y
01|232443|2|3|importation of this product.  Any surcharge will be|Y
01|232443|2|4|disclosed prior to acceptance of an order.|Y
01|232444|1|1|RGA#TAR-61889|Y
01|232444|1|2|MODEL: 5AX201YA S/N:5025|Y
01|232445|42|1|A tariff surcharge may be added to this quotation in|Y
01|232445|42|2|the event of a sustained tariff increase on the|Y
01|232445|42|3|importation of this product.  Any surcharge will be|Y
01|232445|42|4|disclosed prior to acceptance of an order.|Y
01|232446|2|1|This is a NET price for a special 6+1 3000psi rotary|Y
01|232446|2|2|union. This is a special order item.|Y
01|232446|4|1|This is a NET charge only as it is service not sales.|Y
01|232446|4|2|This option is contingent upon machine that is decided|Y
01|232446|4|3|by the end user.  Some makes and models must go through|Y
01|232446|4|4|machine tool dealer.|Y
01|232446|5|1|A tariff surcharge may be added to this quotation in|Y
01|232446|5|2|the event of a sustained tariff increase on the|Y
01|232446|5|3|importation of this product.  Any surcharge will be|Y
01|232446|5|4|disclosed prior to acceptance of an order.|Y
01|232447|1|1|Please Note: This tool is non standard stock  once|Y
01|232447|1|2|a purchase order is placed it cannot be cancelled or|Y
01|232447|1|3|returned. Quoted at NET price.|Y
01|232447|1|4|Tariff Code: 8466.10.0175 / Country of Origin Japan|Y
01|232447|4|1|A tariff surcharge may be added to this quotation in|Y
01|232447|4|2|the event of a sustained tariff increase on the|Y
01|232447|4|3|importation of this product.  Any surcharge will be|Y
01|232447|4|4|disclosed prior to acceptance of an order.|Y
01|232448|5|1|A tariff surcharge may be added to this quotation in|Y
01|232448|5|2|the event of a sustained tariff increase on the|Y
01|232448|5|3|importation of this product.  Any surcharge will be|Y
01|232448|5|4|disclosed prior to acceptance of an order.|Y
01|232449|6|1|A tariff surcharge may be added to this quotation in|Y
01|232449|6|2|the event of a sustained tariff increase on the|Y
01|232449|6|3|importation of this product.  Any surcharge will be|Y
01|232449|6|4|disclosed prior to acceptance of an order.|Y
01|232455|1|1|RGA#LVR-61893/|Y
01|232455|1|2|Repair of MNL12-ER32Z-ICE-10K s/n: 8918810|Y
01|232455|1|3|(Mimatic#101523)|Y
01|232455|2|1|Bearings seals and o-rings to be replaced|Y
01|232455|3|1|A tariff surcharge may be added to this quotation in|Y
01|232455|3|2|the event of a sustained tariff increase on the|Y
01|232455|3|3|importation of this product.  Any surcharge will be|Y
01|232455|3|4|disclosed prior to acceptance of an order.|Y
01|232457|19|1|A tariff surcharge may be added to this quotation in|Y
01|232457|19|2|the event of a sustained tariff increase on the|Y
01|232457|19|3|importation of this product.  Any surcharge will be|Y
01|232457|19|4|disclosed prior to acceptance of an order.|Y
01|232461|5|1|A tariff surcharge may be added to this quotation in|Y
01|232461|5|2|the event of a sustained tariff increase on the|Y
01|232461|5|3|importation of this product.  Any surcharge will be|Y
01|232461|5|4|disclosed prior to acceptance of an order.|Y
01|232465|3|1|A tariff surcharge may be added to this quotation in|Y
01|232465|3|2|the event of a sustained tariff increase on the|Y
01|232465|3|3|importation of this product.  Any surcharge will be|Y
01|232465|3|4|disclosed prior to acceptance of an order.|Y
01|232466|6|1|A tariff surcharge may be added to this quotation in|Y
01|232466|6|2|the event of a sustained tariff increase on the|Y
01|232466|6|3|importation of this product.  Any surcharge will be|Y
01|232466|6|4|disclosed prior to acceptance of an order.|Y
01|232467|1|1|Cables are included|Y
01|232468|2|1|A tariff surcharge may be added to this quotation in|Y
01|232468|2|2|the event of a sustained tariff increase on the|Y
01|232468|2|3|importation of this product.  Any surcharge will be|Y
01|232468|2|4|disclosed prior to acceptance of an order.|Y
01|232469|19|1|A tariff surcharge may be added to this quotation in|Y
01|232469|19|2|the event of a sustained tariff increase on the|Y
01|232469|19|3|importation of this product.  Any surcharge will be|Y
01|232469|19|4|disclosed prior to acceptance of an order.|Y
01|232471|2|1|A tariff surcharge may be added to this quotation in|Y
01|232471|2|2|the event of a sustained tariff increase on the|Y
01|232471|2|3|importation of this product.  Any surcharge will be|Y
01|232471|2|4|disclosed prior to acceptance of an order.|Y
01|232472|4|1|ER32 Manual Collet chuck|Y
01|232472|9|1|RN40-C32-90-PS332|Y
01|232472|9|2|Milling chuck type multi jig holder(Max.Dia.: 32mm)|Y
01|232472|16|1|A tariff surcharge may be added to this quotation in|Y
01|232472|16|2|the event of a sustained tariff increase on the|Y
01|232472|16|3|importation of this product.  Any surcharge will be|Y
01|232472|16|4|disclosed prior to acceptance of an order.|Y
01|232477|2|1|A tariff surcharge may be added to this quotation in|Y
01|232477|2|2|the event of a sustained tariff increase on the|Y
01|232477|2|3|importation of this product.  Any surcharge will be|Y
01|232477|2|4|disclosed prior to acceptance of an order.|Y
01|232478|6|1|A tariff surcharge may be added to this quotation in|Y
01|232478|6|2|the event of a sustained tariff increase on the|Y
01|232478|6|3|importation of this product.  Any surcharge will be|Y
01|232478|6|4|disclosed prior to acceptance of an order.|Y
01|232479|1|1|Tariff Code: 8466.10.0175|Y
01|232479|1|2|Country of Origin Italy|Y
01|232479|2|1|Tariff Code: 8466.10.0175|Y
01|232479|2|2|Country of Origin Italy|Y
01|232479|3|1|A tariff surcharge may be added to this quotation in|Y
01|232479|3|2|the event of a sustained tariff increase on the|Y
01|232479|3|3|importation of this product.  Any surcharge will be|Y
01|232479|3|4|disclosed prior to acceptance of an order.|Y
01|232480|3|1|A tariff surcharge may be added to this quotation in|Y
01|232480|3|2|the event of a sustained tariff increase on the|Y
01|232480|3|3|importation of this product.  Any surcharge will be|Y
01|232480|3|4|disclosed prior to acceptance of an order.|Y
01|232481|2|1|Special price for table that was purchased but never|Y
01|232481|2|2|used in production.|Y
01|232481|5|1|A tariff surcharge may be added to this quotation in|Y
01|232481|5|2|the event of a sustained tariff increase on the|Y
01|232481|5|3|importation of this product.  Any surcharge will be|Y
01|232481|5|4|disclosed prior to acceptance of an order.|Y
01|232482|24|1|A tariff surcharge may be added to this quotation in|Y
01|232482|24|2|the event of a sustained tariff increase on the|Y
01|232482|24|3|importation of this product.  Any surcharge will be|Y
01|232482|24|4|disclosed prior to acceptance of an order.|Y
01|232483|2|1|A tariff surcharge may be added to this quotation in|Y
01|232483|2|2|the event of a sustained tariff increase on the|Y
01|232483|2|3|importation of this product.  Any surcharge will be|Y
01|232483|2|4|disclosed prior to acceptance of an order.|Y
01|232484|6|1|A tariff surcharge may be added to this quotation in|Y
01|232484|6|2|the event of a sustained tariff increase on the|Y
01|232484|6|3|importation of this product.  Any surcharge will be|Y
01|232484|6|4|disclosed prior to acceptance of an order.|Y
01|232485|2|1|Please Note: The 30-LCFX is on our Overstock list.|Y
01|232485|2|2|Discount reflects an extra 20% discount.|Y
01|232485|2|3|We have 18 left in stock and will be discontinued|Y
01|232485|2|4|when they are gone. Item is non-returnable.|Y
01|232485|3|1|A tariff surcharge may be added to this quotation in|Y
01|232485|3|2|the event of a sustained tariff increase on the|Y
01|232485|3|3|importation of this product.  Any surcharge will be|Y
01|232485|3|4|disclosed prior to acceptance of an order.|Y
01|232486|5|1|A tariff surcharge may be added to this quotation in|Y
01|232486|5|2|the event of a sustained tariff increase on the|Y
01|232486|5|3|importation of this product.  Any surcharge will be|Y
01|232486|5|4|disclosed prior to acceptance of an order.|Y
01|232487|2|1|A tariff surcharge may be added to this quotation in|Y
01|232487|2|2|the event of a sustained tariff increase on the|Y
01|232487|2|3|importation of this product.  Any surcharge will be|Y
01|232487|2|4|disclosed prior to acceptance of an order.|Y
01|232488|1|1|Quoted at NET price.|Y
01|232488|1|2|Tariff Code: 8466.10.0175|Y
01|232488|1|3|Country of Origin: Japan|Y
01|232488|2|1|A tariff surcharge may be added to this quotation in|Y
01|232488|2|2|the event of a sustained tariff increase on the|Y
01|232488|2|3|importation of this product.  Any surcharge will be|Y
01|232488|2|4|disclosed prior to acceptance of an order.|Y
01|232489|2|1|A tariff surcharge may be added to this quotation in|Y
01|232489|2|2|the event of a sustained tariff increase on the|Y
01|232489|2|3|importation of this product.  Any surcharge will be|Y
01|232489|2|4|disclosed prior to acceptance of an order.|Y
01|232490|2|1|A tariff surcharge may be added to this quotation in|Y
01|232490|2|2|the event of a sustained tariff increase on the|Y
01|232490|2|3|importation of this product.  Any surcharge will be|Y
01|232490|2|4|disclosed prior to acceptance of an order.|Y
01|232491|14|1|A tariff surcharge may be added to this quotation in|Y
01|232491|14|2|the event of a sustained tariff increase on the|Y
01|232491|14|3|importation of this product.  Any surcharge will be|Y
01|232491|14|4|disclosed prior to acceptance of an order.|Y
01|232492|2|1|A tariff surcharge may be added to this quotation in|Y
01|232492|2|2|the event of a sustained tariff increase on the|Y
01|232492|2|3|importation of this product.  Any surcharge will be|Y
01|232492|2|4|disclosed prior to acceptance of an order.|Y
01|232493|3|1|A tariff surcharge may be added to this quotation in|Y
01|232493|3|2|the event of a sustained tariff increase on the|Y
01|232493|3|3|importation of this product.  Any surcharge will be|Y
01|232493|3|4|disclosed prior to acceptance of an order.|Y
01|232494|21|1|A tariff surcharge may be added to this quotation in|Y
01|232494|21|2|the event of a sustained tariff increase on the|Y
01|232494|21|3|importation of this product.  Any surcharge will be|Y
01|232494|21|4|disclosed prior to acceptance of an order.|Y
01|232495|1|1|**Quoted at NET price**|Y
01|232495|1|2|C4006-0750-4.00 w/ 2-HOLE DIN|Y
01|232495|1|3|This is a special custom item - cannot be cancelled|Y
01|232495|1|4|or returned|Y
01|232495|2|1|A tariff surcharge may be added to this quotation in|Y
01|232495|2|2|the event of a sustained tariff increase on the|Y
01|232495|2|3|importation of this product.  Any surcharge will be|Y
01|232495|2|4|disclosed prior to acceptance of an order.|Y
01|232496|1|1|Manufacturing 8 weeks after signed approval drawing|Y
01|232496|1|2|plus 2 weeks delivery time.|Y
01|232496|6|1|A tariff surcharge may be added to this quotation in|Y
01|232496|6|2|the event of a sustained tariff increase on the|Y
01|232496|6|3|importation of this product.  Any surcharge will be|Y
01|232496|6|4|disclosed prior to acceptance of an order.|Y
01|232497|13|1|A tariff surcharge may be added to this quotation in|Y
01|232497|13|2|the event of a sustained tariff increase on the|Y
01|232497|13|3|importation of this product.  Any surcharge will be|Y
01|232497|13|4|disclosed prior to acceptance of an order.|Y
01|232498|2|1|A tariff surcharge may be added to this quotation in|Y
01|232498|2|2|the event of a sustained tariff increase on the|Y
01|232498|2|3|importation of this product.  Any surcharge will be|Y
01|232498|2|4|disclosed prior to acceptance of an order.|Y
01|232499|6|1|A tariff surcharge may be added to this quotation in|Y
01|232499|6|2|the event of a sustained tariff increase on the|Y
01|232499|6|3|importation of this product.  Any surcharge will be|Y
01|232499|6|4|disclosed prior to acceptance of an order.|Y
01|232501|2|1|A tariff surcharge may be added to this quotation in|Y
01|232501|2|2|the event of a sustained tariff increase on the|Y
01|232501|2|3|importation of this product.  Any surcharge will be|Y
01|232501|2|4|disclosed prior to acceptance of an order.|Y
01|232502|2|1|A tariff surcharge may be added to this quotation in|Y
01|232502|2|2|the event of a sustained tariff increase on the|Y
01|232502|2|3|importation of this product.  Any surcharge will be|Y
01|232502|2|4|disclosed prior to acceptance of an order.|Y
01|232503|4|1|A tariff surcharge may be added to this quotation in|Y
01|232503|4|2|the event of a sustained tariff increase on the|Y
01|232503|4|3|importation of this product.  Any surcharge will be|Y
01|232503|4|4|disclosed prior to acceptance of an order.|Y
01|232504|3|1|BISN 8 3-JAW FORGED STEEL BODY SRT-TRU SCROLL CHUCK|Y
01|232504|4|1|Adapter for Bison chuck|Y
01|232504|5|1|A tariff surcharge may be added to this quotation in|Y
01|232504|5|2|the event of a sustained tariff increase on the|Y
01|232504|5|3|importation of this product.  Any surcharge will be|Y
01|232504|5|4|disclosed prior to acceptance of an order.|Y
01|232505|1|1|This item is non-standard stock and considered special.|Y
01|232505|1|2|Non-returnable Non-cancelable.|Y
01|232505|1|3|Quoted at NET price|Y
01|232505|3|1|A tariff surcharge may be added to this quotation in|Y
01|232505|3|2|the event of a sustained tariff increase on the|Y
01|232505|3|3|importation of this product.  Any surcharge will be|Y
01|232505|3|4|disclosed prior to acceptance of an order.|Y
01|232507|2|1|A tariff surcharge may be added to this quotation in|Y
01|232507|2|2|the event of a sustained tariff increase on the|Y
01|232507|2|3|importation of this product.  Any surcharge will be|Y
01|232507|2|4|disclosed prior to acceptance of an order.|Y
01|232508|1|1|TAR-61889 Replacement for 5AX-201YA SN:5025|Y
01|232508|1|2|Without motor. will use old table MOTOR & CABLES|Y
01|232508|1|3|MOTOR & CABLES are not under warranty|Y
01|232508|1|4|Includes $2500.00 core buy back promo|Y
01|232508|3|1|A tariff surcharge may be added to this quotation in|Y
01|232508|3|2|the event of a sustained tariff increase on the|Y
01|232508|3|3|importation of this product.  Any surcharge will be|Y
01|232508|3|4|disclosed prior to acceptance of an order.|Y
01|232509|2|1|A tariff surcharge may be added to this quotation in|Y
01|232509|2|2|the event of a sustained tariff increase on the|Y
01|232509|2|3|importation of this product.  Any surcharge will be|Y
01|232509|2|4|disclosed prior to acceptance of an order.|Y
01|232510|2|1|A tariff surcharge may be added to this quotation in|Y
01|232510|2|2|the event of a sustained tariff increase on the|Y
01|232510|2|3|importation of this product.  Any surcharge will be|Y
01|232510|2|4|disclosed prior to acceptance of an order.|Y
01|232511|1|1|This holder is DIN modified. Once modified it cannot|Y
01|232511|1|2|be cancelled or returned.|Y
01|232511|5|1|A tariff surcharge may be added to this quotation in|Y
01|232511|5|2|the event of a sustained tariff increase on the|Y
01|232511|5|3|importation of this product.  Any surcharge will be|Y
01|232511|5|4|disclosed prior to acceptance of an order.|Y
01|232512|3|1|A tariff surcharge may be added to this quotation in|Y
01|232512|3|2|the event of a sustained tariff increase on the|Y
01|232512|3|3|importation of this product.  Any surcharge will be|Y
01|232512|3|4|disclosed prior to acceptance of an order.|Y
01|232513|2|1|A tariff surcharge may be added to this quotation in|Y
01|232513|2|2|the event of a sustained tariff increase on the|Y
01|232513|2|3|importation of this product.  Any surcharge will be|Y
01|232513|2|4|disclosed prior to acceptance of an order.|Y
01|232514|2|1|A tariff surcharge may be added to this quotation in|Y
01|232514|2|2|the event of a sustained tariff increase on the|Y
01|232514|2|3|importation of this product.  Any surcharge will be|Y
01|232514|2|4|disclosed prior to acceptance of an order.|Y
01|232515|8|1|A tariff surcharge may be added to this quotation in|Y
01|232515|8|2|the event of a sustained tariff increase on the|Y
01|232515|8|3|importation of this product.  Any surcharge will be|Y
01|232515|8|4|disclosed prior to acceptance of an order.|Y
01|232516|2|1|A tariff surcharge may be added to this quotation in|Y
01|232516|2|2|the event of a sustained tariff increase on the|Y
01|232516|2|3|importation of this product.  Any surcharge will be|Y
01|232516|2|4|disclosed prior to acceptance of an order.|Y
01|232517|4|1|A tariff surcharge may be added to this quotation in|Y
01|232517|4|2|the event of a sustained tariff increase on the|Y
01|232517|4|3|importation of this product.  Any surcharge will be|Y
01|232517|4|4|disclosed prior to acceptance of an order.|Y
01|232519|2|1|A tariff surcharge may be added to this quotation in|Y
01|232519|2|2|the event of a sustained tariff increase on the|Y
01|232519|2|3|importation of this product.  Any surcharge will be|Y
01|232519|2|4|disclosed prior to acceptance of an order.|Y
01|232520|2|1|A tariff surcharge may be added to this quotation in|Y
01|232520|2|2|the event of a sustained tariff increase on the|Y
01|232520|2|3|importation of this product.  Any surcharge will be|Y
01|232520|2|4|disclosed prior to acceptance of an order.|Y
01|232521|9|1|A tariff surcharge may be added to this quotation in|Y
01|232521|9|2|the event of a sustained tariff increase on the|Y
01|232521|9|3|importation of this product.  Any surcharge will be|Y
01|232521|9|4|disclosed prior to acceptance of an order.|Y
01|232522|2|1|A tariff surcharge may be added to this quotation in|Y
01|232522|2|2|the event of a sustained tariff increase on the|Y
01|232522|2|3|importation of this product.  Any surcharge will be|Y
01|232522|2|4|disclosed prior to acceptance of an order.|Y
01|232523|2|1|A tariff surcharge may be added to this quotation in|Y
01|232523|2|2|the event of a sustained tariff increase on the|Y
01|232523|2|3|importation of this product.  Any surcharge will be|Y
01|232523|2|4|disclosed prior to acceptance of an order.|Y
01|232524|2|1|A tariff surcharge may be added to this quotation in|Y
01|232524|2|2|the event of a sustained tariff increase on the|Y
01|232524|2|3|importation of this product.  Any surcharge will be|Y
01|232524|2|4|disclosed prior to acceptance of an order.|Y
01|232525|19|1|A tariff surcharge may be added to this quotation in|Y
01|232525|19|2|the event of a sustained tariff increase on the|Y
01|232525|19|3|importation of this product.  Any surcharge will be|Y
01|232525|19|4|disclosed prior to acceptance of an order.|Y
01|232526|4|1|A tariff surcharge may be added to this quotation in|Y
01|232526|4|2|the event of a sustained tariff increase on the|Y
01|232526|4|3|importation of this product.  Any surcharge will be|Y
01|232526|4|4|disclosed prior to acceptance of an order.|Y
01|232527|6|1|A tariff surcharge may be added to this quotation in|Y
01|232527|6|2|the event of a sustained tariff increase on the|Y
01|232527|6|3|importation of this product.  Any surcharge will be|Y
01|232527|6|4|disclosed prior to acceptance of an order.|Y
01|232528|2|1|A tariff surcharge may be added to this quotation in|Y
01|232528|2|2|the event of a sustained tariff increase on the|Y
01|232528|2|3|importation of this product.  Any surcharge will be|Y
01|232528|2|4|disclosed prior to acceptance of an order.|Y
01|232529|1|1|CAT50-SF0500-8.40 CP|Y
01|232529|1|2|CAT50 Shrink Fit Holder 1/2 25K 8.40 GL|Y
01|232529|1|3|With Coolant Ports|Y
01|232529|6|1|A tariff surcharge may be added to this quotation in|Y
01|232529|6|2|the event of a sustained tariff increase on the|Y
01|232529|6|3|importation of this product.  Any surcharge will be|Y
01|232529|6|4|disclosed prior to acceptance of an order.|Y
01|232530|3|1|A tariff surcharge may be added to this quotation in|Y
01|232530|3|2|the event of a sustained tariff increase on the|Y
01|232530|3|3|importation of this product.  Any surcharge will be|Y
01|232530|3|4|disclosed prior to acceptance of an order.|Y
01|232532|5|1|A tariff surcharge may be added to this quotation in|Y
01|232532|5|2|the event of a sustained tariff increase on the|Y
01|232532|5|3|importation of this product.  Any surcharge will be|Y
01|232532|5|4|disclosed prior to acceptance of an order.|Y
01|232533|-13|1|A tariff surcharge may be added to this quotation in|Y
01|232533|-13|2|the event of a sustained tariff increase on the|Y
01|232533|-13|3|importation of this product.  Any surcharge will be|Y
01|232533|-13|4|disclosed prior to acceptance of an order.|Y
01|232534|2|1|A tariff surcharge may be added to this quotation in|Y
01|232534|2|2|the event of a sustained tariff increase on the|Y
01|232534|2|3|importation of this product.  Any surcharge will be|Y
01|232534|2|4|disclosed prior to acceptance of an order.|Y
01|232535|2|1|A tariff surcharge may be added to this quotation in|Y
01|232535|2|2|the event of a sustained tariff increase on the|Y
01|232535|2|3|importation of this product.  Any surcharge will be|Y
01|232535|2|4|disclosed prior to acceptance of an order.|Y
01|232536|4|1|A tariff surcharge may be added to this quotation in|Y
01|232536|4|2|the event of a sustained tariff increase on the|Y
01|232536|4|3|importation of this product.  Any surcharge will be|Y
01|232536|4|4|disclosed prior to acceptance of an order.|Y
01|232537|2|1|A tariff surcharge may be added to this quotation in|Y
01|232537|2|2|the event of a sustained tariff increase on the|Y
01|232537|2|3|importation of this product.  Any surcharge will be|Y
01|232537|2|4|disclosed prior to acceptance of an order.|Y
01|232538|1|1|HSK63A-SK25-90P|Y
01|232539|5|1|A tariff surcharge may be added to this quotation in|Y
01|232539|5|2|the event of a sustained tariff increase on the|Y
01|232539|5|3|importation of this product.  Any surcharge will be|Y
01|232539|5|4|disclosed prior to acceptance of an order.|Y
01|232540|1|1|Tariff Code: 8466.10.0175|Y
01|232540|1|2|Country of Origin: Italy|Y
01|232540|2|1|A tariff surcharge may be added to this quotation in|Y
01|232540|2|2|the event of a sustained tariff increase on the|Y
01|232540|2|3|importation of this product.  Any surcharge will be|Y
01|232540|2|4|disclosed prior to acceptance of an order.|Y
01|232541|2|1|A tariff surcharge may be added to this quotation in|Y
01|232541|2|2|the event of a sustained tariff increase on the|Y
01|232541|2|3|importation of this product.  Any surcharge will be|Y
01|232541|2|4|disclosed prior to acceptance of an order.|Y
01|232542|2|1|**NET Price**|Y
01|232542|2|2|LN to make block upon receipt of necessary spindle|Y
01|232542|2|3|measurements|Y
01|232542|2|4|Custom Tool - **cannot be cancelled or returned**|Y
01|232542|5|1|A tariff surcharge may be added to this quotation in|Y
01|232542|5|2|the event of a sustained tariff increase on the|Y
01|232542|5|3|importation of this product.  Any surcharge will be|Y
01|232542|5|4|disclosed prior to acceptance of an order.|Y
01|232543|1|1|TNKQ2505-0515 0011|Y
01|232543|2|1|A tariff surcharge may be added to this quotation in|Y
01|232543|2|2|the event of a sustained tariff increase on the|Y
01|232543|2|3|importation of this product.  Any surcharge will be|Y
01|232543|2|4|disclosed prior to acceptance of an order.|Y
01|232544|2|1|A tariff surcharge may be added to this quotation in|Y
01|232544|2|2|the event of a sustained tariff increase on the|Y
01|232544|2|3|importation of this product.  Any surcharge will be|Y
01|232544|2|4|disclosed prior to acceptance of an order.|Y
01|232545|2|1|A tariff surcharge may be added to this quotation in|Y
01|232545|2|2|the event of a sustained tariff increase on the|Y
01|232545|2|3|importation of this product.  Any surcharge will be|Y
01|232545|2|4|disclosed prior to acceptance of an order.|Y
01|232546|2|1|A tariff surcharge may be added to this quotation in|Y
01|232546|2|2|the event of a sustained tariff increase on the|Y
01|232546|2|3|importation of this product.  Any surcharge will be|Y
01|232546|2|4|disclosed prior to acceptance of an order.|Y
01|232547|1|1|RGA#LVR-61888/|Y
01|232547|1|2|Repair of OKL3-ER32Z s/n: AL709 (Alps#OK101-13000)|Y
01|232547|2|1|Bearings o-rings collet nut and spindle to be|Y
01|232547|2|2|replaced.|Y
01|232547|3|1|A tariff surcharge may be added to this quotation in|Y
01|232547|3|2|the event of a sustained tariff increase on the|Y
01|232547|3|3|importation of this product.  Any surcharge will be|Y
01|232547|3|4|disclosed prior to acceptance of an order.|Y
01|232548|6|1|A tariff surcharge may be added to this quotation in|Y
01|232548|6|2|the event of a sustained tariff increase on the|Y
01|232548|6|3|importation of this product.  Any surcharge will be|Y
01|232548|6|4|disclosed prior to acceptance of an order.|Y
01|232549|4|1|A tariff surcharge may be added to this quotation in|Y
01|232549|4|2|the event of a sustained tariff increase on the|Y
01|232549|4|3|importation of this product.  Any surcharge will be|Y
01|232549|4|4|disclosed prior to acceptance of an order.|Y
01|232550|2|1|A tariff surcharge may be added to this quotation in|Y
01|232550|2|2|the event of a sustained tariff increase on the|Y
01|232550|2|3|importation of this product.  Any surcharge will be|Y
01|232550|2|4|disclosed prior to acceptance of an order.|Y
01|232551|2|1|A tariff surcharge may be added to this quotation in|Y
01|232551|2|2|the event of a sustained tariff increase on the|Y
01|232551|2|3|importation of this product.  Any surcharge will be|Y
01|232551|2|4|disclosed prior to acceptance of an order.|Y
01|232552|6|1|A tariff surcharge may be added to this quotation in|Y
01|232552|6|2|the event of a sustained tariff increase on the|Y
01|232552|6|3|importation of this product.  Any surcharge will be|Y
01|232552|6|4|disclosed prior to acceptance of an order.|Y
01|232553|2|1|A tariff surcharge may be added to this quotation in|Y
01|232553|2|2|the event of a sustained tariff increase on the|Y
01|232553|2|3|importation of this product.  Any surcharge will be|Y
01|232553|2|4|disclosed prior to acceptance of an order.|Y
01|232554|3|1|A tariff surcharge may be added to this quotation in|Y
01|232554|3|2|the event of a sustained tariff increase on the|Y
01|232554|3|3|importation of this product.  Any surcharge will be|Y
01|232554|3|4|disclosed prior to acceptance of an order.|Y
01|232555|6|1|A tariff surcharge may be added to this quotation in|Y
01|232555|6|2|the event of a sustained tariff increase on the|Y
01|232555|6|3|importation of this product.  Any surcharge will be|Y
01|232555|6|4|disclosed prior to acceptance of an order.|Y
01|232556|4|1|A tariff surcharge may be added to this quotation in|Y
01|232556|4|2|the event of a sustained tariff increase on the|Y
01|232556|4|3|importation of this product.  Any surcharge will be|Y
01|232556|4|4|disclosed prior to acceptance of an order.|Y
01|232557|1|1|Pais de Origen: Japon|Y
01|232557|2|1|Pais de Origen: Japon|Y
01|232557|3|1|Pais de Origen:Japon|Y
01|232557|4|1|A tariff surcharge may be added to this quotation in|Y
01|232557|4|2|the event of a sustained tariff increase on the|Y
01|232557|4|3|importation of this product.  Any surcharge will be|Y
01|232557|4|4|disclosed prior to acceptance of an order.|Y
01|232558|2|1|A tariff surcharge may be added to this quotation in|Y
01|232558|2|2|the event of a sustained tariff increase on the|Y
01|232558|2|3|importation of this product.  Any surcharge will be|Y
01|232558|2|4|disclosed prior to acceptance of an order.|Y
01|232559|2|1|A tariff surcharge may be added to this quotation in|Y
01|232559|2|2|the event of a sustained tariff increase on the|Y
01|232559|2|3|importation of this product.  Any surcharge will be|Y
01|232559|2|4|disclosed prior to acceptance of an order.|Y
01|232560|2|1|A tariff surcharge may be added to this quotation in|Y
01|232560|2|2|the event of a sustained tariff increase on the|Y
01|232560|2|3|importation of this product.  Any surcharge will be|Y
01|232560|2|4|disclosed prior to acceptance of an order.|Y
01|232561|3|1|A tariff surcharge may be added to this quotation in|Y
01|232561|3|2|the event of a sustained tariff increase on the|Y
01|232561|3|3|importation of this product.  Any surcharge will be|Y
01|232561|3|4|disclosed prior to acceptance of an order.|Y
01|232562|-13|1|A tariff surcharge may be added to this quotation in|Y
01|232562|-13|2|the event of a sustained tariff increase on the|Y
01|232562|-13|3|importation of this product.  Any surcharge will be|Y
01|232562|-13|4|disclosed prior to acceptance of an order.|Y
01|232563|2|1|A tariff surcharge may be added to this quotation in|Y
01|232563|2|2|the event of a sustained tariff increase on the|Y
01|232563|2|3|importation of this product.  Any surcharge will be|Y
01|232563|2|4|disclosed prior to acceptance of an order.|Y
01|232564|2|1|A tariff surcharge may be added to this quotation in|Y
01|232564|2|2|the event of a sustained tariff increase on the|Y
01|232564|2|3|importation of this product.  Any surcharge will be|Y
01|232564|2|4|disclosed prior to acceptance of an order.|Y
01|232565|4|1|A tariff surcharge may be added to this quotation in|Y
01|232565|4|2|the event of a sustained tariff increase on the|Y
01|232565|4|3|importation of this product.  Any surcharge will be|Y
01|232565|4|4|disclosed prior to acceptance of an order.|Y
01|232566|8|1|Delivery:|Y
01|232566|8|2|4 pcs Stock Rest 8/Beginning|Y
01|232566|9|1|A tariff surcharge may be added to this quotation in|Y
01|232566|9|2|the event of a sustained tariff increase on the|Y
01|232566|9|3|importation of this product.  Any surcharge will be|Y
01|232566|9|4|disclosed prior to acceptance of an order.|Y
01|232567|2|1|A tariff surcharge may be added to this quotation in|Y
01|232567|2|2|the event of a sustained tariff increase on the|Y
01|232567|2|3|importation of this product.  Any surcharge will be|Y
01|232567|2|4|disclosed prior to acceptance of an order.|Y
01|232568|3|1|A tariff surcharge may be added to this quotation in|Y
01|232568|3|2|the event of a sustained tariff increase on the|Y
01|232568|3|3|importation of this product.  Any surcharge will be|Y
01|232568|3|4|disclosed prior to acceptance of an order.|Y
01|232569|2|1|A tariff surcharge may be added to this quotation in|Y
01|232569|2|2|the event of a sustained tariff increase on the|Y
01|232569|2|3|importation of this product.  Any surcharge will be|Y
01|232569|2|4|disclosed prior to acceptance of an order.|Y
01|232570|20|1|A tariff surcharge may be added to this quotation in|Y
01|232570|20|2|the event of a sustained tariff increase on the|Y
01|232570|20|3|importation of this product.  Any surcharge will be|Y
01|232570|20|4|disclosed prior to acceptance of an order.|Y
01|232571|6|1|A tariff surcharge may be added to this quotation in|Y
01|232571|6|2|the event of a sustained tariff increase on the|Y
01|232571|6|3|importation of this product.  Any surcharge will be|Y
01|232571|6|4|disclosed prior to acceptance of an order.|Y
01|232572|3|1|Includes complete 4th axis installation kit: Servo Amp|Y
01|232572|3|2|All cables travel and labor|Y
01|232572|5|1|A tariff surcharge may be added to this quotation in|Y
01|232572|5|2|the event of a sustained tariff increase on the|Y
01|232572|5|3|importation of this product.  Any surcharge will be|Y
01|232572|5|4|disclosed prior to acceptance of an order.|Y
01|232573|5|1|A tariff surcharge may be added to this quotation in|Y
01|232573|5|2|the event of a sustained tariff increase on the|Y
01|232573|5|3|importation of this product.  Any surcharge will be|Y
01|232573|5|4|disclosed prior to acceptance of an order.|Y
01|232574|3|1|A tariff surcharge may be added to this quotation in|Y
01|232574|3|2|the event of a sustained tariff increase on the|Y
01|232574|3|3|importation of this product.  Any surcharge will be|Y
01|232574|3|4|disclosed prior to acceptance of an order.|Y
01|232575|4|1|A tariff surcharge may be added to this quotation in|Y
01|232575|4|2|the event of a sustained tariff increase on the|Y
01|232575|4|3|importation of this product.  Any surcharge will be|Y
01|232575|4|4|disclosed prior to acceptance of an order.|Y
01|232576|2|1|P/N: CCK32-22|Y
01|232576|2|2|Straight Coolant Collet/Sleeve OD32mm ID22mm|Y
01|232576|2|3|*Special quoted at NET price|N
01|232576|3|1|A tariff surcharge may be added to this quotation in|Y
01|232576|3|2|the event of a sustained tariff increase on the|Y
01|232576|3|3|importation of this product.  Any surcharge will be|Y
01|232576|3|4|disclosed prior to acceptance of an order.|Y
01|232577|3|1|A tariff surcharge may be added to this quotation in|Y
01|232577|3|2|the event of a sustained tariff increase on the|Y
01|232577|3|3|importation of this product.  Any surcharge will be|Y
01|232577|3|4|disclosed prior to acceptance of an order.|Y
01|232578|1|1|Cable set included|Y
01|232578|5|1|A tariff surcharge may be added to this quotation in|Y
01|232578|5|2|the event of a sustained tariff increase on the|Y
01|232578|5|3|importation of this product.  Any surcharge will be|Y
01|232578|5|4|disclosed prior to acceptance of an order.|Y
01|232579|13|1|A tariff surcharge may be added to this quotation in|Y
01|232579|13|2|the event of a sustained tariff increase on the|Y
01|232579|13|3|importation of this product.  Any surcharge will be|Y
01|232579|13|4|disclosed prior to acceptance of an order.|Y
01|232580|24|1|A tariff surcharge may be added to this quotation in|Y
01|232580|24|2|the event of a sustained tariff increase on the|Y
01|232580|24|3|importation of this product.  Any surcharge will be|Y
01|232580|24|4|disclosed prior to acceptance of an order.|Y
01|232581|4|1|A tariff surcharge may be added to this quotation in|Y
01|232581|4|2|the event of a sustained tariff increase on the|Y
01|232581|4|3|importation of this product.  Any surcharge will be|Y
01|232581|4|4|disclosed prior to acceptance of an order.|Y
01|232582|2|1|A tariff surcharge may be added to this quotation in|Y
01|232582|2|2|the event of a sustained tariff increase on the|Y
01|232582|2|3|importation of this product.  Any surcharge will be|Y
01|232582|2|4|disclosed prior to acceptance of an order.|Y
01|232583|2|1|A tariff surcharge may be added to this quotation in|Y
01|232583|2|2|the event of a sustained tariff increase on the|Y
01|232583|2|3|importation of this product.  Any surcharge will be|Y
01|232583|2|4|disclosed prior to acceptance of an order.|Y
01|232584|3|1|A tariff surcharge may be added to this quotation in|Y
01|232584|3|2|the event of a sustained tariff increase on the|Y
01|232584|3|3|importation of this product.  Any surcharge will be|Y
01|232584|3|4|disclosed prior to acceptance of an order.|Y
01|232585|3|1|A tariff surcharge may be added to this quotation in|Y
01|232585|3|2|the event of a sustained tariff increase on the|Y
01|232585|3|3|importation of this product.  Any surcharge will be|Y
01|232585|3|4|disclosed prior to acceptance of an order.|Y
01|232586|2|1|A tariff surcharge may be added to this quotation in|Y
01|232586|2|2|the event of a sustained tariff increase on the|Y
01|232586|2|3|importation of this product.  Any surcharge will be|Y
01|232586|2|4|disclosed prior to acceptance of an order.|Y
01|232587|1|1|No Inspection Required.|Y
01|232587|2|1|A tariff surcharge may be added to this quotation in|Y
01|232587|2|2|the event of a sustained tariff increase on the|Y
01|232587|2|3|importation of this product.  Any surcharge will be|Y
01|232587|2|4|disclosed prior to acceptance of an order.|Y
01|232588|2|1|A tariff surcharge may be added to this quotation in|Y
01|232588|2|2|the event of a sustained tariff increase on the|Y
01|232588|2|3|importation of this product.  Any surcharge will be|Y
01|232588|2|4|disclosed prior to acceptance of an order.|Y
01|232589|4|1|A tariff surcharge may be added to this quotation in|Y
01|232589|4|2|the event of a sustained tariff increase on the|Y
01|232589|4|3|importation of this product.  Any surcharge will be|Y
01|232589|4|4|disclosed prior to acceptance of an order.|Y
01|232590|3|1|A tariff surcharge may be added to this quotation in|Y
01|232590|3|2|the event of a sustained tariff increase on the|Y
01|232590|3|3|importation of this product.  Any surcharge will be|Y
01|232590|3|4|disclosed prior to acceptance of an order.|Y
01|232591|2|1|A tariff surcharge may be added to this quotation in|Y
01|232591|2|2|the event of a sustained tariff increase on the|Y
01|232591|2|3|importation of this product.  Any surcharge will be|Y
01|232591|2|4|disclosed prior to acceptance of an order.|Y
01|232592|8|1|A tariff surcharge may be added to this quotation in|Y
01|232592|8|2|the event of a sustained tariff increase on the|Y
01|232592|8|3|importation of this product.  Any surcharge will be|Y
01|232592|8|4|disclosed prior to acceptance of an order.|Y
01|232593|74|1|A tariff surcharge of 8% will be added to every order|Y
01|232593|74|2|placed after September 1st 2025(until further notice)|Y
01|232593|74|3|This surcharge will be acknowledged upon acceptance|Y
01|232594|2|1|A tariff surcharge may be added to this quotation in|Y
01|232594|2|2|the event of a sustained tariff increase on the|Y
01|232594|2|3|importation of this product.  Any surcharge will be|Y
01|232594|2|4|disclosed prior to acceptance of an order.|Y
01|232595|3|1|A tariff surcharge may be added to this quotation in|Y
01|232595|3|2|the event of a sustained tariff increase on the|Y
01|232595|3|3|importation of this product.  Any surcharge will be|Y
01|232595|3|4|disclosed prior to acceptance of an order.|Y
01|232596|5|1|A tariff surcharge may be added to this quotation in|Y
01|232596|5|2|the event of a sustained tariff increase on the|Y
01|232596|5|3|importation of this product.  Any surcharge will be|Y
01|232596|5|4|disclosed prior to acceptance of an order.|Y
01|232597|2|1|A tariff surcharge may be added to this quotation in|Y
01|232597|2|2|the event of a sustained tariff increase on the|Y
01|232597|2|3|importation of this product.  Any surcharge will be|Y
01|232597|2|4|disclosed prior to acceptance of an order.|Y
01|232598|2|1|A tariff surcharge may be added to this quotation in|Y
01|232598|2|2|the event of a sustained tariff increase on the|Y
01|232598|2|3|importation of this product.  Any surcharge will be|Y
01|232598|2|4|disclosed prior to acceptance of an order.|Y
01|232599|2|1|A tariff surcharge may be added to this quotation in|Y
01|232599|2|2|the event of a sustained tariff increase on the|Y
01|232599|2|3|importation of this product.  Any surcharge will be|Y
01|232599|2|4|disclosed prior to acceptance of an order.|Y
01|232600|21|1|A tariff surcharge may be added to this quotation in|Y
01|232600|21|2|the event of a sustained tariff increase on the|Y
01|232600|21|3|importation of this product.  Any surcharge will be|Y
01|232600|21|4|disclosed prior to acceptance of an order.|Y
01|232601|9|1|A tariff surcharge may be added to this quotation in|Y
01|232601|9|2|the event of a sustained tariff increase on the|Y
01|232601|9|3|importation of this product.  Any surcharge will be|Y
01|232601|9|4|disclosed prior to acceptance of an order.|Y
01|232602|1|1|RGA#TAR-61833|Y
01|232602|1|2|5AX-2MT-105-120 SN:8248F|Y
01|232602|44|1|A tariff surcharge may be added to this quotation in|Y
01|232602|44|2|the event of a sustained tariff increase on the|Y
01|232602|44|3|importation of this product.  Any surcharge will be|Y
01|232602|44|4|disclosed prior to acceptance of an order.|Y
01|232603|2|1|A tariff surcharge may be added to this quotation in|Y
01|232603|2|2|the event of a sustained tariff increase on the|Y
01|232603|2|3|importation of this product.  Any surcharge will be|Y
01|232603|2|4|disclosed prior to acceptance of an order.|Y
01|232604|8|1|A tariff surcharge may be added to this quotation in|Y
01|232604|8|2|the event of a sustained tariff increase on the|Y
01|232604|8|3|importation of this product.  Any surcharge will be|Y
01|232604|8|4|disclosed prior to acceptance of an order.|Y
01|232605|3|1|A tariff surcharge may be added to this quotation in|Y
01|232605|3|2|the event of a sustained tariff increase on the|Y
01|232605|3|3|importation of this product.  Any surcharge will be|Y
01|232605|3|4|disclosed prior to acceptance of an order.|Y
01|232606|4|1|A tariff surcharge may be added to this quotation in|Y
01|232606|4|2|the event of a sustained tariff increase on the|Y
01|232606|4|3|importation of this product.  Any surcharge will be|Y
01|232606|4|4|disclosed prior to acceptance of an order.|Y
01|232607|20|1|A tariff surcharge may be added to this quotation in|Y
01|232607|20|2|the event of a sustained tariff increase on the|Y
01|232607|20|3|importation of this product.  Any surcharge will be|Y
01|232607|20|4|disclosed prior to acceptance of an order.|Y
01|232608|3|1|A tariff surcharge may be added to this quotation in|Y
01|232608|3|2|the event of a sustained tariff increase on the|Y
01|232608|3|3|importation of this product.  Any surcharge will be|Y
01|232608|3|4|disclosed prior to acceptance of an order.|Y
01|232609|2|1|A tariff surcharge may be added to this quotation in|Y
01|232609|2|2|the event of a sustained tariff increase on the|Y
01|232609|2|3|importation of this product.  Any surcharge will be|Y
01|232609|2|4|disclosed prior to acceptance of an order.|Y
01|232610|3|1|A tariff surcharge may be added to this quotation in|Y
01|232610|3|2|the event of a sustained tariff increase on the|Y
01|232610|3|3|importation of this product.  Any surcharge will be|Y
01|232610|3|4|disclosed prior to acceptance of an order.|Y
01|232611|2|1|Special non-standard stock. Cannot be cancelled or|Y
01|232611|2|2|returned upon receipt of PO.|Y
01|232611|4|1|A tariff surcharge may be added to this quotation in|Y
01|232611|4|2|the event of a sustained tariff increase on the|Y
01|232611|4|3|importation of this product.  Any surcharge will be|Y
01|232611|4|4|disclosed prior to acceptance of an order.|Y
01|232612|3|1|A tariff surcharge may be added to this quotation in|Y
01|232612|3|2|the event of a sustained tariff increase on the|Y
01|232612|3|3|importation of this product.  Any surcharge will be|Y
01|232612|3|4|disclosed prior to acceptance of an order.|Y
01|232613|2|1|A tariff surcharge may be added to this quotation in|Y
01|232613|2|2|the event of a sustained tariff increase on the|Y
01|232613|2|3|importation of this product.  Any surcharge will be|Y
01|232613|2|4|disclosed prior to acceptance of an order.|Y
01|232614|2|1|A tariff surcharge may be added to this quotation in|Y
01|232614|2|2|the event of a sustained tariff increase on the|Y
01|232614|2|3|importation of this product.  Any surcharge will be|Y
01|232614|2|4|disclosed prior to acceptance of an order.|Y
01|232615|2|1|A tariff surcharge may be added to this quotation in|Y
01|232615|2|2|the event of a sustained tariff increase on the|Y
01|232615|2|3|importation of this product.  Any surcharge will be|Y
01|232615|2|4|disclosed prior to acceptance of an order.|Y
01|232616|3|1|A tariff surcharge may be added to this quotation in|Y
01|232616|3|2|the event of a sustained tariff increase on the|Y
01|232616|3|3|importation of this product.  Any surcharge will be|Y
01|232616|3|4|disclosed prior to acceptance of an order.|Y
01|232617|3|1|A tariff surcharge may be added to this quotation in|Y
01|232617|3|2|the event of a sustained tariff increase on the|Y
01|232617|3|3|importation of this product.  Any surcharge will be|Y
01|232617|3|4|disclosed prior to acceptance of an order.|Y
01|232618|5|1|A tariff surcharge may be added to this quotation in|Y
01|232618|5|2|the event of a sustained tariff increase on the|Y
01|232618|5|3|importation of this product.  Any surcharge will be|Y
01|232618|5|4|disclosed prior to acceptance of an order.|Y
01|232619|2|1|A tariff surcharge may be added to this quotation in|Y
01|232619|2|2|the event of a sustained tariff increase on the|Y
01|232619|2|3|importation of this product.  Any surcharge will be|Y
01|232619|2|4|disclosed prior to acceptance of an order.|Y
01|232620|2|1|A tariff surcharge may be added to this quotation in|Y
01|232620|2|2|the event of a sustained tariff increase on the|Y
01|232620|2|3|importation of this product.  Any surcharge will be|Y
01|232620|2|4|disclosed prior to acceptance of an order.|Y
01|232621|3|1|A tariff surcharge may be added to this quotation in|Y
01|232621|3|2|the event of a sustained tariff increase on the|Y
01|232621|3|3|importation of this product.  Any surcharge will be|Y
01|232621|3|4|disclosed prior to acceptance of an order.|Y
01|232622|5|1|A tariff surcharge may be added to this quotation in|Y
01|232622|5|2|the event of a sustained tariff increase on the|Y
01|232622|5|3|importation of this product.  Any surcharge will be|Y
01|232622|5|4|disclosed prior to acceptance of an order.|Y
01|232623|2|1|A tariff surcharge may be added to this quotation in|Y
01|232623|2|2|the event of a sustained tariff increase on the|Y
01|232623|2|3|importation of this product.  Any surcharge will be|Y
01|232623|2|4|disclosed prior to acceptance of an order.|Y
01|232624|9|1|A tariff surcharge may be added to this quotation in|Y
01|232624|9|2|the event of a sustained tariff increase on the|Y
01|232624|9|3|importation of this product.  Any surcharge will be|Y
01|232624|9|4|disclosed prior to acceptance of an order.|Y
01|232625|2|1|A tariff surcharge may be added to this quotation in|Y
01|232625|2|2|the event of a sustained tariff increase on the|Y
01|232625|2|3|importation of this product.  Any surcharge will be|Y
01|232625|2|4|disclosed prior to acceptance of an order.|Y
01|232626|2|1|A tariff surcharge may be added to this quotation in|Y
01|232626|2|2|the event of a sustained tariff increase on the|Y
01|232626|2|3|importation of this product.  Any surcharge will be|Y
01|232626|2|4|disclosed prior to acceptance of an order.|Y
01|232627|4|1|ER32 Manual Collet chuck|Y
01|232627|9|1|RN40-C32-90-PS332|Y
01|232627|9|2|Milling chuck type multi jig holder(Max.Dia.: 32mm)|Y
01|232627|16|1|A tariff surcharge may be added to this quotation in|Y
01|232627|16|2|the event of a sustained tariff increase on the|Y
01|232627|16|3|importation of this product.  Any surcharge will be|Y
01|232627|16|4|disclosed prior to acceptance of an order.|Y
01|232628|5|1|A tariff surcharge may be added to this quotation in|Y
01|232628|5|2|the event of a sustained tariff increase on the|Y
01|232628|5|3|importation of this product.  Any surcharge will be|Y
01|232628|5|4|disclosed prior to acceptance of an order.|Y
01|232629|2|1|A tariff surcharge may be added to this quotation in|Y
01|232629|2|2|the event of a sustained tariff increase on the|Y
01|232629|2|3|importation of this product.  Any surcharge will be|Y
01|232629|2|4|disclosed prior to acceptance of an order.|Y
01|232630|2|1|A tariff surcharge may be added to this quotation in|Y
01|232630|2|2|the event of a sustained tariff increase on the|Y
01|232630|2|3|importation of this product.  Any surcharge will be|Y
01|232630|2|4|disclosed prior to acceptance of an order.|Y
01|232631|2|1|A tariff surcharge may be added to this quotation in|Y
01|232631|2|2|the event of a sustained tariff increase on the|Y
01|232631|2|3|importation of this product.  Any surcharge will be|Y
01|232631|2|4|disclosed prior to acceptance of an order.|Y
01|232632|3|1|A tariff surcharge may be added to this quotation in|Y
01|232632|3|2|the event of a sustained tariff increase on the|Y
01|232632|3|3|importation of this product.  Any surcharge will be|Y
01|232632|3|4|disclosed prior to acceptance of an order.|Y
01|232633|2|1|A tariff surcharge may be added to this quotation in|Y
01|232633|2|2|the event of a sustained tariff increase on the|Y
01|232633|2|3|importation of this product.  Any surcharge will be|Y
01|232633|2|4|disclosed prior to acceptance of an order.|Y
01|232636|3|1|A tariff surcharge may be added to this quotation in|Y
01|232636|3|2|the event of a sustained tariff increase on the|Y
01|232636|3|3|importation of this product.  Any surcharge will be|Y
01|232636|3|4|disclosed prior to acceptance of an order.|Y
01|232637|2|1|A tariff surcharge may be added to this quotation in|Y
01|232637|2|2|the event of a sustained tariff increase on the|Y
01|232637|2|3|importation of this product.  Any surcharge will be|Y
01|232637|2|4|disclosed prior to acceptance of an order.|Y
01|232638|5|1|A tariff surcharge may be added to this quotation in|Y
01|232638|5|2|the event of a sustained tariff increase on the|Y
01|232638|5|3|importation of this product.  Any surcharge will be|Y
01|232638|5|4|disclosed prior to acceptance of an order.|Y
01|232639|3|1|A tariff surcharge may be added to this quotation in|Y
01|232639|3|2|the event of a sustained tariff increase on the|Y
01|232639|3|3|importation of this product.  Any surcharge will be|Y
01|232639|3|4|disclosed prior to acceptance of an order.|Y
01|232640|3|1|A tariff surcharge may be added to this quotation in|Y
01|232640|3|2|the event of a sustained tariff increase on the|Y
01|232640|3|3|importation of this product.  Any surcharge will be|Y
01|232640|3|4|disclosed prior to acceptance of an order.|Y
01|232641|9|1|A tariff surcharge may be added to this quotation in|Y
01|232641|9|2|the event of a sustained tariff increase on the|Y
01|232641|9|3|importation of this product.  Any surcharge will be|Y
01|232641|9|4|disclosed prior to acceptance of an order.|Y
01|232642|2|1|A tariff surcharge may be added to this quotation in|Y
01|232642|2|2|the event of a sustained tariff increase on the|Y
01|232642|2|3|importation of this product.  Any surcharge will be|Y
01|232642|2|4|disclosed prior to acceptance of an order.|Y
01|232643|5|1|A tariff surcharge may be added to this quotation in|Y
01|232643|5|2|the event of a sustained tariff increase on the|Y
01|232643|5|3|importation of this product.  Any surcharge will be|Y
01|232643|5|4|disclosed prior to acceptance of an order.|Y
01|232644|4|1|A tariff surcharge may be added to this quotation in|Y
01|232644|4|2|the event of a sustained tariff increase on the|Y
01|232644|4|3|importation of this product.  Any surcharge will be|Y
01|232644|4|4|disclosed prior to acceptance of an order.|Y
01|232645|2|1|A tariff surcharge may be added to this quotation in|Y
01|232645|2|2|the event of a sustained tariff increase on the|Y
01|232645|2|3|importation of this product.  Any surcharge will be|Y
01|232645|2|4|disclosed prior to acceptance of an order.|Y
01|232646|3|1|A tariff surcharge may be added to this quotation in|Y
01|232646|3|2|the event of a sustained tariff increase on the|Y
01|232646|3|3|importation of this product.  Any surcharge will be|Y
01|232646|3|4|disclosed prior to acceptance of an order.|Y
01|232647|2|1|A tariff surcharge may be added to this quotation in|Y
01|232647|2|2|the event of a sustained tariff increase on the|Y
01|232647|2|3|importation of this product.  Any surcharge will be|Y
01|232647|2|4|disclosed prior to acceptance of an order.|Y
01|232648|4|1|A tariff surcharge may be added to this quotation in|Y
01|232648|4|2|the event of a sustained tariff increase on the|Y
01|232648|4|3|importation of this product.  Any surcharge will be|Y
01|232648|4|4|disclosed prior to acceptance of an order.|Y
01|232649|11|1|A tariff surcharge may be added to this quotation in|Y
01|232649|11|2|the event of a sustained tariff increase on the|Y
01|232649|11|3|importation of this product.  Any surcharge will be|Y
01|232649|11|4|disclosed prior to acceptance of an order.|Y
01|232650|4|1|A tariff surcharge may be added to this quotation in|Y
01|232650|4|2|the event of a sustained tariff increase on the|Y
01|232650|4|3|importation of this product.  Any surcharge will be|Y
01|232650|4|4|disclosed prior to acceptance of an order.|Y
01|232651|2|1|A tariff surcharge may be added to this quotation in|Y
01|232651|2|2|the event of a sustained tariff increase on the|Y
01|232651|2|3|importation of this product.  Any surcharge will be|Y
01|232651|2|4|disclosed prior to acceptance of an order.|Y
01|232652|7|1|A tariff surcharge may be added to this quotation in|Y
01|232652|7|2|the event of a sustained tariff increase on the|Y
01|232652|7|3|importation of this product.  Any surcharge will be|Y
01|232652|7|4|disclosed prior to acceptance of an order.|Y
01|232653|2|1|A tariff surcharge may be added to this quotation in|Y
01|232653|2|2|the event of a sustained tariff increase on the|Y
01|232653|2|3|importation of this product.  Any surcharge will be|Y
01|232653|2|4|disclosed prior to acceptance of an order.|Y
01|232654|7|1|A tariff surcharge may be added to this quotation in|Y
01|232654|7|2|the event of a sustained tariff increase on the|Y
01|232654|7|3|importation of this product.  Any surcharge will be|Y
01|232654|7|4|disclosed prior to acceptance of an order.|Y
01|232655|6|1|A tariff surcharge may be added to this quotation in|Y
01|232655|6|2|the event of a sustained tariff increase on the|Y
01|232655|6|3|importation of this product.  Any surcharge will be|Y
01|232655|6|4|disclosed prior to acceptance of an order.|Y
01|232656|2|1|Special non-standard stock. Cannot be cancelled or|Y
01|232656|2|2|returned upon receipt of PO.|Y
01|232656|2|3|**MINIMUM ORDER QTY 3**  **NET PRICE**|Y
01|232656|13|1|A tariff surcharge may be added to this quotation in|Y
01|232656|13|2|the event of a sustained tariff increase on the|Y
01|232656|13|3|importation of this product.  Any surcharge will be|Y
01|232656|13|4|disclosed prior to acceptance of an order.|Y
01|232657|3|1|A tariff surcharge may be added to this quotation in|Y
01|232657|3|2|the event of a sustained tariff increase on the|Y
01|232657|3|3|importation of this product.  Any surcharge will be|Y
01|232657|3|4|disclosed prior to acceptance of an order.|Y
01|232658|3|1|A tariff surcharge may be added to this quotation in|Y
01|232658|3|2|the event of a sustained tariff increase on the|Y
01|232658|3|3|importation of this product.  Any surcharge will be|Y
01|232658|3|4|disclosed prior to acceptance of an order.|Y
01|232659|1|1|Includes air/hyd booster.|Y
01|232659|6|1|A tariff surcharge may be added to this quotation in|Y
01|232659|6|2|the event of a sustained tariff increase on the|Y
01|232659|6|3|importation of this product.  Any surcharge will be|Y
01|232659|6|4|disclosed prior to acceptance of an order.|Y
01|232660|1|1|ST22-SC-SK-97|Y
01|232660|2|1|K22-SC-MMC8-100|Y
01|232660|3|1|A tariff surcharge may be added to this quotation in|Y
01|232660|3|2|the event of a sustained tariff increase on the|Y
01|232660|3|3|importation of this product.  Any surcharge will be|Y
01|232660|3|4|disclosed prior to acceptance of an order.|Y
01|232661|3|1|A tariff surcharge may be added to this quotation in|Y
01|232661|3|2|the event of a sustained tariff increase on the|Y
01|232661|3|3|importation of this product.  Any surcharge will be|Y
01|232661|3|4|disclosed prior to acceptance of an order.|Y
01|232662|14|1|A tariff surcharge may be added to this quotation in|Y
01|232662|14|2|the event of a sustained tariff increase on the|Y
01|232662|14|3|importation of this product.  Any surcharge will be|Y
01|232662|14|4|disclosed prior to acceptance of an order.|Y
01|232663|1|1|Price includes ten standard inch size SF holders with|Y
01|232663|1|2|less than 6.00 gauge lengths and a 200V shrink fit unit|Y
01|232663|1|3|Please confirm voltage needed.|Y
01|232663|6|1|A tariff surcharge may be added to this quotation in|Y
01|232663|6|2|the event of a sustained tariff increase on the|Y
01|232663|6|3|importation of this product.  Any surcharge will be|Y
01|232663|6|4|disclosed prior to acceptance of an order.|Y
01|232664|5|1|A tariff surcharge may be added to this quotation in|Y
01|232664|5|2|the event of a sustained tariff increase on the|Y
01|232664|5|3|importation of this product.  Any surcharge will be|Y
01|232664|5|4|disclosed prior to acceptance of an order.|Y
01|232665|2|1|A tariff surcharge may be added to this quotation in|Y
01|232665|2|2|the event of a sustained tariff increase on the|Y
01|232665|2|3|importation of this product.  Any surcharge will be|Y
01|232665|2|4|disclosed prior to acceptance of an order.|Y
01|232666|2|1|A tariff surcharge may be added to this quotation in|Y
01|232666|2|2|the event of a sustained tariff increase on the|Y
01|232666|2|3|importation of this product.  Any surcharge will be|Y
01|232666|2|4|disclosed prior to acceptance of an order.|Y
01|232667|8|1|A tariff surcharge may be added to this quotation in|Y
01|232667|8|2|the event of a sustained tariff increase on the|Y
01|232667|8|3|importation of this product.  Any surcharge will be|Y
01|232667|8|4|disclosed prior to acceptance of an order.|Y
01|232668|5|1|A tariff surcharge may be added to this quotation in|Y
01|232668|5|2|the event of a sustained tariff increase on the|Y
01|232668|5|3|importation of this product.  Any surcharge will be|Y
01|232668|5|4|disclosed prior to acceptance of an order.|Y
01|232669|2|1|A tariff surcharge may be added to this quotation in|Y
01|232669|2|2|the event of a sustained tariff increase on the|Y
01|232669|2|3|importation of this product.  Any surcharge will be|Y
01|232669|2|4|disclosed prior to acceptance of an order.|Y
01|232670|13|1|Overstock. Last 2pcs after that discontinued.|Y
01|232670|26|1|A tariff surcharge may be added to this quotation in|Y
01|232670|26|2|the event of a sustained tariff increase on the|Y
01|232670|26|3|importation of this product.  Any surcharge will be|Y
01|232670|26|4|disclosed prior to acceptance of an order.|Y
01|232671|3|1|A tariff surcharge may be added to this quotation in|Y
01|232671|3|2|the event of a sustained tariff increase on the|Y
01|232671|3|3|importation of this product.  Any surcharge will be|Y
01|232671|3|4|disclosed prior to acceptance of an order.|Y
01|232672|3|1|A tariff surcharge may be added to this quotation in|Y
01|232672|3|2|the event of a sustained tariff increase on the|Y
01|232672|3|3|importation of this product.  Any surcharge will be|Y
01|232672|3|4|disclosed prior to acceptance of an order.|Y
01|232673|2|1|A tariff surcharge may be added to this quotation in|Y
01|232673|2|2|the event of a sustained tariff increase on the|Y
01|232673|2|3|importation of this product.  Any surcharge will be|Y
01|232673|2|4|disclosed prior to acceptance of an order.|Y
01|232674|4|1|Please Note: This collet is non-standard stock and|Y
01|232674|4|2|considered Special. Once a purchase order is placed|Y
01|232674|4|3|it cannot be cancelled or returned.|Y
01|232674|8|1|A tariff surcharge may be added to this quotation in|Y
01|232674|8|2|the event of a sustained tariff increase on the|Y
01|232674|8|3|importation of this product.  Any surcharge will be|Y
01|232674|8|4|disclosed prior to acceptance of an order.|Y
01|232675|2|1|Spindle wrench for OKL2-ER20Z|Y
01|232675|3|1|Nut wrench for OKL2-ER20Z|Y
01|232675|6|1|Spindle wrench for MNZ20-SK20X-ICE-12K and|Y
01|232675|6|2|MNL12-SK20X-ICE-10K-J|Y
01|232675|7|1|Nut wrench for MNZ20-SK20X-ICE-12K and|Y
01|232675|7|2|MNL12-SK20X-ICE-10K-J|Y
01|232676|4|1|A tariff surcharge may be added to this quotation in|Y
01|232676|4|2|the event of a sustained tariff increase on the|Y
01|232676|4|3|importation of this product.  Any surcharge will be|Y
01|232676|4|4|disclosed prior to acceptance of an order.|Y
01|232677|4|1|A tariff surcharge may be added to this quotation in|Y
01|232677|4|2|the event of a sustained tariff increase on the|Y
01|232677|4|3|importation of this product.  Any surcharge will be|Y
01|232677|4|4|disclosed prior to acceptance of an order.|Y
01|232678|3|1|A tariff surcharge may be added to this quotation in|Y
01|232678|3|2|the event of a sustained tariff increase on the|Y
01|232678|3|3|importation of this product.  Any surcharge will be|Y
01|232678|3|4|disclosed prior to acceptance of an order.|Y
01|232679|3|1|A tariff surcharge may be added to this quotation in|Y
01|232679|3|2|the event of a sustained tariff increase on the|Y
01|232679|3|3|importation of this product.  Any surcharge will be|Y
01|232679|3|4|disclosed prior to acceptance of an order.|Y
01|232680|6|1|A tariff surcharge may be added to this quotation in|Y
01|232680|6|2|the event of a sustained tariff increase on the|Y
01|232680|6|3|importation of this product.  Any surcharge will be|Y
01|232680|6|4|disclosed prior to acceptance of an order.|Y
01|232681|2|1|A tariff surcharge may be added to this quotation in|Y
01|232681|2|2|the event of a sustained tariff increase on the|Y
01|232681|2|3|importation of this product.  Any surcharge will be|Y
01|232681|2|4|disclosed prior to acceptance of an order.|Y
01|232682|1|1|Stock over at factory please allow 2-3 weeks with|Y
01|232682|1|2|customs and delivery. These are non-standard stock|Y
01|232682|1|3|items and considered specials. Once a PO has been|Y
01|232682|1|4|issued these items cannot be cancelled or returned.|Y
01|232683|2|1|Overstock promo 20% extra added to the discount.|Y
01|232683|2|2|These are non returnable.|Y
01|232683|3|1|A tariff surcharge may be added to this quotation in|Y
01|232683|3|2|the event of a sustained tariff increase on the|Y
01|232683|3|3|importation of this product.  Any surcharge will be|Y
01|232683|3|4|disclosed prior to acceptance of an order.|Y
01|232684|1|1|Quantity Break:|Y
01|232684|1|2|1-23 pcs: $308.40/EA (40% discount)|Y
01|232684|1|3|24+ pcs: $282.70/EA (45% discount)|Y
01|232684|2|1|A tariff surcharge may be added to this quotation in|Y
01|232684|2|2|the event of a sustained tariff increase on the|Y
01|232684|2|3|importation of this product.  Any surcharge will be|Y
01|232684|2|4|disclosed prior to acceptance of an order.|Y
01|232685|2|1|A tariff surcharge may be added to this quotation in|Y
01|232685|2|2|the event of a sustained tariff increase on the|Y
01|232685|2|3|importation of this product.  Any surcharge will be|Y
01|232685|2|4|disclosed prior to acceptance of an order.|Y
01|232686|2|1|A tariff surcharge may be added to this quotation in|Y
01|232686|2|2|the event of a sustained tariff increase on the|Y
01|232686|2|3|importation of this product.  Any surcharge will be|Y
01|232686|2|4|disclosed prior to acceptance of an order.|Y
01|232687|4|1|A tariff surcharge may be added to this quotation in|Y
01|232687|4|2|the event of a sustained tariff increase on the|Y
01|232687|4|3|importation of this product.  Any surcharge will be|Y
01|232687|4|4|disclosed prior to acceptance of an order.|Y
01|232688|18|1|A tariff surcharge may be added to this quotation in|Y
01|232688|18|2|the event of a sustained tariff increase on the|Y
01|232688|18|3|importation of this product.  Any surcharge will be|Y
01|232688|18|4|disclosed prior to acceptance of an order.|Y
01|232689|3|1|Used demo table with special pricing.|Y
01|232689|6|1|A tariff surcharge may be added to this quotation in|Y
01|232689|6|2|the event of a sustained tariff increase on the|Y
01|232689|6|3|importation of this product.  Any surcharge will be|Y
01|232689|6|4|disclosed prior to acceptance of an order.|Y
01|232690|4|1|A tariff surcharge may be added to this quotation in|Y
01|232690|4|2|the event of a sustained tariff increase on the|Y
01|232690|4|3|importation of this product.  Any surcharge will be|Y
01|232690|4|4|disclosed prior to acceptance of an order.|Y
01|232691|2|1|A tariff surcharge may be added to this quotation in|Y
01|232691|2|2|the event of a sustained tariff increase on the|Y
01|232691|2|3|importation of this product.  Any surcharge will be|Y
01|232691|2|4|disclosed prior to acceptance of an order.|Y
01|232692|2|1|A tariff surcharge may be added to this quotation in|Y
01|232692|2|2|the event of a sustained tariff increase on the|Y
01|232692|2|3|importation of this product.  Any surcharge will be|Y
01|232692|2|4|disclosed prior to acceptance of an order.|Y
01|232693|3|1|A tariff surcharge may be added to this quotation in|Y
01|232693|3|2|the event of a sustained tariff increase on the|Y
01|232693|3|3|importation of this product.  Any surcharge will be|Y
01|232693|3|4|disclosed prior to acceptance of an order.|Y
01|232694|2|1|A tariff surcharge may be added to this quotation in|Y
01|232694|2|2|the event of a sustained tariff increase on the|Y
01|232694|2|3|importation of this product.  Any surcharge will be|Y
01|232694|2|4|disclosed prior to acceptance of an order.|Y
01|232695|4|1|A tariff surcharge may be added to this quotation in|Y
01|232695|4|2|the event of a sustained tariff increase on the|Y
01|232695|4|3|importation of this product.  Any surcharge will be|Y
01|232695|4|4|disclosed prior to acceptance of an order.|Y
01|232696|2|1|A tariff surcharge may be added to this quotation in|Y
01|232696|2|2|the event of a sustained tariff increase on the|Y
01|232696|2|3|importation of this product.  Any surcharge will be|Y
01|232696|2|4|disclosed prior to acceptance of an order.|Y
01|232697|5|1|A tariff surcharge may be added to this quotation in|Y
01|232697|5|2|the event of a sustained tariff increase on the|Y
01|232697|5|3|importation of this product.  Any surcharge will be|Y
01|232697|5|4|disclosed prior to acceptance of an order.|Y
01|232698|7|1|A tariff surcharge may be added to this quotation in|Y
01|232698|7|2|the event of a sustained tariff increase on the|Y
01|232698|7|3|importation of this product.  Any surcharge will be|Y
01|232698|7|4|disclosed prior to acceptance of an order.|Y
01|232699|2|1|A tariff surcharge may be added to this quotation in|Y
01|232699|2|2|the event of a sustained tariff increase on the|Y
01|232699|2|3|importation of this product.  Any surcharge will be|Y
01|232699|2|4|disclosed prior to acceptance of an order.|Y
01|232700|2|1|A tariff surcharge may be added to this quotation in|Y
01|232700|2|2|the event of a sustained tariff increase on the|Y
01|232700|2|3|importation of this product.  Any surcharge will be|Y
01|232700|2|4|disclosed prior to acceptance of an order.|Y
01|232701|5|1|A tariff surcharge may be added to this quotation in|Y
01|232701|5|2|the event of a sustained tariff increase on the|Y
01|232701|5|3|importation of this product.  Any surcharge will be|Y
01|232701|5|4|disclosed prior to acceptance of an order.|Y
01|232702|1|1|Pacakge includes drive units cabinet cables junction|Y
01|232702|1|2|box cables sheet metal divider.|Y
01|232702|3|1|A tariff surcharge may be added to this quotation in|Y
01|232702|3|2|the event of a sustained tariff increase on the|Y
01|232702|3|3|importation of this product.  Any surcharge will be|Y
01|232702|3|4|disclosed prior to acceptance of an order.|Y
01|232703|20|1|Quoted at NET price|Y
01|232703|23|1|A tariff surcharge may be added to this quotation in|Y
01|232703|23|2|the event of a sustained tariff increase on the|Y
01|232703|23|3|importation of this product.  Any surcharge will be|Y
01|232703|23|4|disclosed prior to acceptance of an order.|Y
01|232704|3|1|A tariff surcharge may be added to this quotation in|Y
01|232704|3|2|the event of a sustained tariff increase on the|Y
01|232704|3|3|importation of this product.  Any surcharge will be|Y
01|232704|3|4|disclosed prior to acceptance of an order.|Y
01|232705|11|1|A tariff surcharge may be added to this quotation in|Y
01|232705|11|2|the event of a sustained tariff increase on the|Y
01|232705|11|3|importation of this product.  Any surcharge will be|Y
01|232705|11|4|disclosed prior to acceptance of an order.|Y
01|232706|2|1|A tariff surcharge may be added to this quotation in|Y
01|232706|2|2|the event of a sustained tariff increase on the|Y
01|232706|2|3|importation of this product.  Any surcharge will be|Y
01|232706|2|4|disclosed prior to acceptance of an order.|Y
01|232707|3|1|A tariff surcharge may be added to this quotation in|Y
01|232707|3|2|the event of a sustained tariff increase on the|Y
01|232707|3|3|importation of this product.  Any surcharge will be|Y
01|232707|3|4|disclosed prior to acceptance of an order.|Y
01|232708|29|1|A tariff surcharge may be added to this quotation in|Y
01|232708|29|2|the event of a sustained tariff increase on the|Y
01|232708|29|3|importation of this product.  Any surcharge will be|Y
01|232708|29|4|disclosed prior to acceptance of an order.|Y
01|232709|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|232709|2|2|FOR MEDIUM BED FANUC ROBODRILL|Y
01|232709|4|1|A tariff surcharge may be added to this quotation in|Y
01|232709|4|2|the event of a sustained tariff increase on the|Y
01|232709|4|3|importation of this product.  Any surcharge will be|Y
01|232709|4|4|disclosed prior to acceptance of an order.|Y
01|232710|14|1|Quoted at NET price|Y
01|232710|17|1|A tariff surcharge may be added to this quotation in|Y
01|232710|17|2|the event of a sustained tariff increase on the|Y
01|232710|17|3|importation of this product.  Any surcharge will be|Y
01|232710|17|4|disclosed prior to acceptance of an order.|Y
01|232711|2|1|A tariff surcharge may be added to this quotation in|Y
01|232711|2|2|the event of a sustained tariff increase on the|Y
01|232711|2|3|importation of this product.  Any surcharge will be|Y
01|232711|2|4|disclosed prior to acceptance of an order.|Y
01|232712|2|1|A tariff surcharge may be added to this quotation in|Y
01|232712|2|2|the event of a sustained tariff increase on the|Y
01|232712|2|3|importation of this product.  Any surcharge will be|Y
01|232712|2|4|disclosed prior to acceptance of an order.|Y
01|232713|2|1|A tariff surcharge may be added to this quotation in|Y
01|232713|2|2|the event of a sustained tariff increase on the|Y
01|232713|2|3|importation of this product.  Any surcharge will be|Y
01|232713|2|4|disclosed prior to acceptance of an order.|Y
01|232714|5|1|A tariff surcharge may be added to this quotation in|Y
01|232714|5|2|the event of a sustained tariff increase on the|Y
01|232714|5|3|importation of this product.  Any surcharge will be|Y
01|232714|5|4|disclosed prior to acceptance of an order.|Y
01|232715|4|1|CAT50-SF0312-3.15CP is a Special and would require|Y
01|232715|4|2|a request for quote from factory in Europe.|Y
01|232715|4|3|PCX has never ordered this from L-N.|Y
01|232715|41|1|A tariff surcharge may be added to this quotation in|Y
01|232715|41|2|the event of a sustained tariff increase on the|Y
01|232715|41|3|importation of this product.  Any surcharge will be|Y
01|232715|41|4|disclosed prior to acceptance of an order.|Y
01|232716|2|1|A tariff surcharge may be added to this quotation in|Y
01|232716|2|2|the event of a sustained tariff increase on the|Y
01|232716|2|3|importation of this product.  Any surcharge will be|Y
01|232716|2|4|disclosed prior to acceptance of an order.|Y
01|232717|2|1|A tariff surcharge may be added to this quotation in|Y
01|232717|2|2|the event of a sustained tariff increase on the|Y
01|232717|2|3|importation of this product.  Any surcharge will be|Y
01|232717|2|4|disclosed prior to acceptance of an order.|Y
01|232719|4|1|A tariff surcharge may be added to this quotation in|Y
01|232719|4|2|the event of a sustained tariff increase on the|Y
01|232719|4|3|importation of this product.  Any surcharge will be|Y
01|232719|4|4|disclosed prior to acceptance of an order.|Y
01|232719|5|1|PRE-PAY AND ADD FREIGHT WILL BE $1488|Y
01|232719|5|2|THIS IS GUARANTEED DELIVERY UPS BY FRIDAY BY 10:30 AM|Y
01|232720|3|1|A tariff surcharge may be added to this quotation in|Y
01|232720|3|2|the event of a sustained tariff increase on the|Y
01|232720|3|3|importation of this product.  Any surcharge will be|Y
01|232720|3|4|disclosed prior to acceptance of an order.|Y
01|232721|3|1|A tariff surcharge may be added to this quotation in|Y
01|232721|3|2|the event of a sustained tariff increase on the|Y
01|232721|3|3|importation of this product.  Any surcharge will be|Y
01|232721|3|4|disclosed prior to acceptance of an order.|Y
01|232722|2|1|A tariff surcharge may be added to this quotation in|Y
01|232722|2|2|the event of a sustained tariff increase on the|Y
01|232722|2|3|importation of this product.  Any surcharge will be|Y
01|232722|2|4|disclosed prior to acceptance of an order.|Y
01|232723|18|1|A tariff surcharge may be added to this quotation in|Y
01|232723|18|2|the event of a sustained tariff increase on the|Y
01|232723|18|3|importation of this product.  Any surcharge will be|Y
01|232723|18|4|disclosed prior to acceptance of an order.|Y
01|232724|1|1|Please allow for 4 months manufacturing & delivery.|Y
01|232724|3|1|A tariff surcharge may be added to this quotation in|Y
01|232724|3|2|the event of a sustained tariff increase on the|Y
01|232724|3|3|importation of this product.  Any surcharge will be|Y
01|232724|3|4|disclosed prior to acceptance of an order.|Y
01|232725|6|1|A tariff surcharge may be added to this quotation in|Y
01|232725|6|2|the event of a sustained tariff increase on the|Y
01|232725|6|3|importation of this product.  Any surcharge will be|Y
01|232725|6|4|disclosed prior to acceptance of an order.|Y
01|232726|2|1|A tariff surcharge may be added to this quotation in|Y
01|232726|2|2|the event of a sustained tariff increase on the|Y
01|232726|2|3|importation of this product.  Any surcharge will be|Y
01|232726|2|4|disclosed prior to acceptance of an order.|Y
01|232727|10|1|A tariff surcharge may be added to this quotation in|Y
01|232727|10|2|the event of a sustained tariff increase on the|Y
01|232727|10|3|importation of this product.  Any surcharge will be|Y
01|232727|10|4|disclosed prior to acceptance of an order.|Y
01|232728|5|1|A tariff surcharge may be added to this quotation in|Y
01|232728|5|2|the event of a sustained tariff increase on the|Y
01|232728|5|3|importation of this product.  Any surcharge will be|Y
01|232728|5|4|disclosed prior to acceptance of an order.|Y
01|232729|2|1|A tariff surcharge may be added to this quotation in|Y
01|232729|2|2|the event of a sustained tariff increase on the|Y
01|232729|2|3|importation of this product.  Any surcharge will be|Y
01|232729|2|4|disclosed prior to acceptance of an order.|Y
01|232730|7|1|A tariff surcharge may be added to this quotation in|Y
01|232730|7|2|the event of a sustained tariff increase on the|Y
01|232730|7|3|importation of this product.  Any surcharge will be|Y
01|232730|7|4|disclosed prior to acceptance of an order.|Y
01|232731|5|1|A tariff surcharge may be added to this quotation in|Y
01|232731|5|2|the event of a sustained tariff increase on the|Y
01|232731|5|3|importation of this product.  Any surcharge will be|Y
01|232731|5|4|disclosed prior to acceptance of an order.|Y
01|232732|10|1|A tariff surcharge may be added to this quotation in|Y
01|232732|10|2|the event of a sustained tariff increase on the|Y
01|232732|10|3|importation of this product.  Any surcharge will be|Y
01|232732|10|4|disclosed prior to acceptance of an order.|Y
01|232733|13|1|A tariff surcharge may be added to this quotation in|Y
01|232733|13|2|the event of a sustained tariff increase on the|Y
01|232733|13|3|importation of this product.  Any surcharge will be|Y
01|232733|13|4|disclosed prior to acceptance of an order.|Y
01|232734|4|1|Custom made adapter to mount manual 5C closer to CNC260|Y
01|232734|6|1|A tariff surcharge may be added to this quotation in|Y
01|232734|6|2|the event of a sustained tariff increase on the|Y
01|232734|6|3|importation of this product.  Any surcharge will be|Y
01|232734|6|4|disclosed prior to acceptance of an order.|Y
01|232735|4|1|A tariff surcharge may be added to this quotation in|Y
01|232735|4|2|the event of a sustained tariff increase on the|Y
01|232735|4|3|importation of this product.  Any surcharge will be|Y
01|232735|4|4|disclosed prior to acceptance of an order.|Y
01|232736|47|1|A tariff surcharge may be added to this quotation in|Y
01|232736|47|2|the event of a sustained tariff increase on the|Y
01|232736|47|3|importation of this product.  Any surcharge will be|Y
01|232736|47|4|disclosed prior to acceptance of an order.|Y
01|232737|2|1|A tariff surcharge may be added to this quotation in|Y
01|232737|2|2|the event of a sustained tariff increase on the|Y
01|232737|2|3|importation of this product.  Any surcharge will be|Y
01|232737|2|4|disclosed prior to acceptance of an order.|Y
01|232738|3|1|A tariff surcharge may be added to this quotation in|Y
01|232738|3|2|the event of a sustained tariff increase on the|Y
01|232738|3|3|importation of this product.  Any surcharge will be|Y
01|232738|3|4|disclosed prior to acceptance of an order.|Y
01|232740|5|1|A tariff surcharge may be added to this quotation in|Y
01|232740|5|2|the event of a sustained tariff increase on the|Y
01|232740|5|3|importation of this product.  Any surcharge will be|Y
01|232740|5|4|disclosed prior to acceptance of an order.|Y
01|232741|1|1|Final Part# C4006-0500-4.00DIN-M  **NET Price**|Y
01|232741|1|2|Special custom item - cannot be cancelled or returned|Y
01|232741|1|3|upon receipt of PO.|Y
01|232741|2|1|A tariff surcharge may be added to this quotation in|Y
01|232741|2|2|the event of a sustained tariff increase on the|Y
01|232741|2|3|importation of this product.  Any surcharge will be|Y
01|232741|2|4|disclosed prior to acceptance of an order.|Y
01|232742|6|1|A tariff surcharge may be added to this quotation in|Y
01|232742|6|2|the event of a sustained tariff increase on the|Y
01|232742|6|3|importation of this product.  Any surcharge will be|Y
01|232742|6|4|disclosed prior to acceptance of an order.|Y
01|232743|1|1|C3 SK6 60MM|Y
01|232743|2|1|C3 sk6 45MM|Y
01|232743|3|1|C6 SK6 75MM|Y
01|232743|4|1|A tariff surcharge may be added to this quotation in|Y
01|232743|4|2|the event of a sustained tariff increase on the|Y
01|232743|4|3|importation of this product.  Any surcharge will be|Y
01|232743|4|4|disclosed prior to acceptance of an order.|Y
01|232744|2|1|A tariff surcharge may be added to this quotation in|Y
01|232744|2|2|the event of a sustained tariff increase on the|Y
01|232744|2|3|importation of this product.  Any surcharge will be|Y
01|232744|2|4|disclosed prior to acceptance of an order.|Y
01|232745|3|1|A tariff surcharge may be added to this quotation in|Y
01|232745|3|2|the event of a sustained tariff increase on the|Y
01|232745|3|3|importation of this product.  Any surcharge will be|Y
01|232745|3|4|disclosed prior to acceptance of an order.|Y
01|232746|3|1|A tariff surcharge may be added to this quotation in|Y
01|232746|3|2|the event of a sustained tariff increase on the|Y
01|232746|3|3|importation of this product.  Any surcharge will be|Y
01|232746|3|4|disclosed prior to acceptance of an order.|Y
01|232747|5|1|A tariff surcharge may be added to this quotation in|Y
01|232747|5|2|the event of a sustained tariff increase on the|Y
01|232747|5|3|importation of this product.  Any surcharge will be|Y
01|232747|5|4|disclosed prior to acceptance of an order.|Y
01|232748|1|1|Non Returnable Non Cancelable|Y
01|232748|2|1|A tariff surcharge may be added to this quotation in|Y
01|232748|2|2|the event of a sustained tariff increase on the|Y
01|232748|2|3|importation of this product.  Any surcharge will be|Y
01|232748|2|4|disclosed prior to acceptance of an order.|Y
01|232749|1|1|The tables are stock. Need to order motor and cables.|Y
01|232749|2|1|A tariff surcharge may be added to this quotation in|Y
01|232749|2|2|the event of a sustained tariff increase on the|Y
01|232749|2|3|importation of this product.  Any surcharge will be|Y
01|232749|2|4|disclosed prior to acceptance of an order.|Y
01|232750|47|1|A tariff surcharge may be added to this quotation in|Y
01|232750|47|2|the event of a sustained tariff increase on the|Y
01|232750|47|3|importation of this product.  Any surcharge will be|Y
01|232750|47|4|disclosed prior to acceptance of an order.|Y
01|232751|4|1|A tariff surcharge may be added to this quotation in|Y
01|232751|4|2|the event of a sustained tariff increase on the|Y
01|232751|4|3|importation of this product.  Any surcharge will be|Y
01|232751|4|4|disclosed prior to acceptance of an order.|Y
01|232752|5|1|A tariff surcharge may be added to this quotation in|Y
01|232752|5|2|the event of a sustained tariff increase on the|Y
01|232752|5|3|importation of this product.  Any surcharge will be|Y
01|232752|5|4|disclosed prior to acceptance of an order.|Y
01|232753|2|1|A tariff surcharge may be added to this quotation in|Y
01|232753|2|2|the event of a sustained tariff increase on the|Y
01|232753|2|3|importation of this product.  Any surcharge will be|Y
01|232753|2|4|disclosed prior to acceptance of an order.|Y
01|232754|9|1|A tariff surcharge may be added to this quotation in|Y
01|232754|9|2|the event of a sustained tariff increase on the|Y
01|232754|9|3|importation of this product.  Any surcharge will be|Y
01|232754|9|4|disclosed prior to acceptance of an order.|Y
01|232755|5|1|A tariff surcharge may be added to this quotation in|Y
01|232755|5|2|the event of a sustained tariff increase on the|Y
01|232755|5|3|importation of this product.  Any surcharge will be|Y
01|232755|5|4|disclosed prior to acceptance of an order.|Y
01|232756|2|1|Please note additional 20% applied per overstock promo.|Y
01|232756|2|2|These cannot be cancelled or returned upon order/PO.|Y
01|232756|3|1|A tariff surcharge may be added to this quotation in|Y
01|232756|3|2|the event of a sustained tariff increase on the|Y
01|232756|3|3|importation of this product.  Any surcharge will be|Y
01|232756|3|4|disclosed prior to acceptance of an order.|Y
01|232757|18|1|A tariff surcharge may be added to this quotation in|Y
01|232757|18|2|the event of a sustained tariff increase on the|Y
01|232757|18|3|importation of this product.  Any surcharge will be|Y
01|232757|18|4|disclosed prior to acceptance of an order.|Y
01|232758|2|1|A tariff surcharge may be added to this quotation in|Y
01|232758|2|2|the event of a sustained tariff increase on the|Y
01|232758|2|3|importation of this product.  Any surcharge will be|Y
01|232758|2|4|disclosed prior to acceptance of an order.|Y
01|232759|5|1|A tariff surcharge may be added to this quotation in|Y
01|232759|5|2|the event of a sustained tariff increase on the|Y
01|232759|5|3|importation of this product.  Any surcharge will be|Y
01|232759|5|4|disclosed prior to acceptance of an order.|Y
01|232760|13|1|A tariff surcharge may be added to this quotation in|Y
01|232760|13|2|the event of a sustained tariff increase on the|Y
01|232760|13|3|importation of this product.  Any surcharge will be|Y
01|232760|13|4|disclosed prior to acceptance of an order.|Y
01|232761|4|1|A tariff surcharge may be added to this quotation in|Y
01|232761|4|2|the event of a sustained tariff increase on the|Y
01|232761|4|3|importation of this product.  Any surcharge will be|Y
01|232761|4|4|disclosed prior to acceptance of an order.|Y
01|232762|3|1|A tariff surcharge may be added to this quotation in|Y
01|232762|3|2|the event of a sustained tariff increase on the|Y
01|232762|3|3|importation of this product.  Any surcharge will be|Y
01|232762|3|4|disclosed prior to acceptance of an order.|Y
01|232763|3|1|A tariff surcharge may be added to this quotation in|Y
01|232763|3|2|the event of a sustained tariff increase on the|Y
01|232763|3|3|importation of this product.  Any surcharge will be|Y
01|232763|3|4|disclosed prior to acceptance of an order.|Y
01|232764|4|1|A tariff surcharge may be added to this quotation in|Y
01|232764|4|2|the event of a sustained tariff increase on the|Y
01|232764|4|3|importation of this product.  Any surcharge will be|Y
01|232764|4|4|disclosed prior to acceptance of an order.|Y
01|232765|6|1|A tariff surcharge may be added to this quotation in|Y
01|232765|6|2|the event of a sustained tariff increase on the|Y
01|232765|6|3|importation of this product.  Any surcharge will be|Y
01|232765|6|4|disclosed prior to acceptance of an order.|Y
01|232766|4|1|A tariff surcharge may be added to this quotation in|Y
01|232766|4|2|the event of a sustained tariff increase on the|Y
01|232766|4|3|importation of this product.  Any surcharge will be|Y
01|232766|4|4|disclosed prior to acceptance of an order.|Y
01|232767|2|1|A tariff surcharge may be added to this quotation in|Y
01|232767|2|2|the event of a sustained tariff increase on the|Y
01|232767|2|3|importation of this product.  Any surcharge will be|Y
01|232767|2|4|disclosed prior to acceptance of an order.|Y
01|232768|3|1|A tariff surcharge may be added to this quotation in|Y
01|232768|3|2|the event of a sustained tariff increase on the|Y
01|232768|3|3|importation of this product.  Any surcharge will be|Y
01|232768|3|4|disclosed prior to acceptance of an order.|Y
01|232769|5|1|A tariff surcharge may be added to this quotation in|Y
01|232769|5|2|the event of a sustained tariff increase on the|Y
01|232769|5|3|importation of this product.  Any surcharge will be|Y
01|232769|5|4|disclosed prior to acceptance of an order.|Y
01|232770|6|1|A tariff surcharge may be added to this quotation in|Y
01|232770|6|2|the event of a sustained tariff increase on the|Y
01|232770|6|3|importation of this product.  Any surcharge will be|Y
01|232770|6|4|disclosed prior to acceptance of an order.|Y
01|232771|11|1|A tariff surcharge may be added to this quotation in|Y
01|232771|11|2|the event of a sustained tariff increase on the|Y
01|232771|11|3|importation of this product.  Any surcharge will be|Y
01|232771|11|4|disclosed prior to acceptance of an order.|Y
01|232772|3|1|A tariff surcharge may be added to this quotation in|Y
01|232772|3|2|the event of a sustained tariff increase on the|Y
01|232772|3|3|importation of this product.  Any surcharge will be|Y
01|232772|3|4|disclosed prior to acceptance of an order.|Y
01|232773|7|1|A tariff surcharge may be added to this quotation in|Y
01|232773|7|2|the event of a sustained tariff increase on the|Y
01|232773|7|3|importation of this product.  Any surcharge will be|Y
01|232773|7|4|disclosed prior to acceptance of an order.|Y
01|232774|17|1|A tariff surcharge may be added to this quotation in|Y
01|232774|17|2|the event of a sustained tariff increase on the|Y
01|232774|17|3|importation of this product.  Any surcharge will be|Y
01|232774|17|4|disclosed prior to acceptance of an order.|Y
01|232775|2|1|A tariff surcharge may be added to this quotation in|Y
01|232775|2|2|the event of a sustained tariff increase on the|Y
01|232775|2|3|importation of this product.  Any surcharge will be|Y
01|232775|2|4|disclosed prior to acceptance of an order.|Y
01|232776|29|1|A tariff surcharge may be added to this quotation in|Y
01|232776|29|2|the event of a sustained tariff increase on the|Y
01|232776|29|3|importation of this product.  Any surcharge will be|Y
01|232776|29|4|disclosed prior to acceptance of an order.|Y
01|232777|2|1|A tariff surcharge may be added to this quotation in|Y
01|232777|2|2|the event of a sustained tariff increase on the|Y
01|232777|2|3|importation of this product.  Any surcharge will be|Y
01|232777|2|4|disclosed prior to acceptance of an order.|Y
01|232778|2|1|A tariff surcharge may be added to this quotation in|Y
01|232778|2|2|the event of a sustained tariff increase on the|Y
01|232778|2|3|importation of this product.  Any surcharge will be|Y
01|232778|2|4|disclosed prior to acceptance of an order.|Y
01|232779|4|1|A tariff surcharge may be added to this quotation in|Y
01|232779|4|2|the event of a sustained tariff increase on the|Y
01|232779|4|3|importation of this product.  Any surcharge will be|Y
01|232779|4|4|disclosed prior to acceptance of an order.|Y
01|232780|2|1|A tariff surcharge may be added to this quotation in|Y
01|232780|2|2|the event of a sustained tariff increase on the|Y
01|232780|2|3|importation of this product.  Any surcharge will be|Y
01|232780|2|4|disclosed prior to acceptance of an order.|Y
01|232781|2|1|A tariff surcharge may be added to this quotation in|Y
01|232781|2|2|the event of a sustained tariff increase on the|Y
01|232781|2|3|importation of this product.  Any surcharge will be|Y
01|232781|2|4|disclosed prior to acceptance of an order.|Y
01|232782|3|1|A tariff surcharge may be added to this quotation in|Y
01|232782|3|2|the event of a sustained tariff increase on the|Y
01|232782|3|3|importation of this product.  Any surcharge will be|Y
01|232782|3|4|disclosed prior to acceptance of an order.|Y
01|232783|5|1|A tariff surcharge may be added to this quotation in|Y
01|232783|5|2|the event of a sustained tariff increase on the|Y
01|232783|5|3|importation of this product.  Any surcharge will be|Y
01|232783|5|4|disclosed prior to acceptance of an order.|Y
01|232784|5|1|A tariff surcharge may be added to this quotation in|Y
01|232784|5|2|the event of a sustained tariff increase on the|Y
01|232784|5|3|importation of this product.  Any surcharge will be|Y
01|232784|5|4|disclosed prior to acceptance of an order.|Y
01|232785|2|1|A tariff surcharge may be added to this quotation in|Y
01|232785|2|2|the event of a sustained tariff increase on the|Y
01|232785|2|3|importation of this product.  Any surcharge will be|Y
01|232785|2|4|disclosed prior to acceptance of an order.|Y
01|232786|2|1|A tariff surcharge may be added to this quotation in|Y
01|232786|2|2|the event of a sustained tariff increase on the|Y
01|232786|2|3|importation of this product.  Any surcharge will be|Y
01|232786|2|4|disclosed prior to acceptance of an order.|Y
01|232787|1|1|Net price relects a purchase order of 1 or 2 heads.|Y
01|232787|2|1|Net price reflects a purchase order of 3-Plus heads.|Y
01|232787|3|1|Positioning block quote at Net price. If you decide to|Y
01|232787|3|2|place an order our engineers will work with you or|Y
01|232787|3|3|your customer to make the block. Thank you.|Y
01|232787|5|1|A tariff surcharge may be added to this quotation in|Y
01|232787|5|2|the event of a sustained tariff increase on the|Y
01|232787|5|3|importation of this product.  Any surcharge will be|Y
01|232787|5|4|disclosed prior to acceptance of an order.|Y
01|232788|3|1|A tariff surcharge may be added to this quotation in|Y
01|232788|3|2|the event of a sustained tariff increase on the|Y
01|232788|3|3|importation of this product.  Any surcharge will be|Y
01|232788|3|4|disclosed prior to acceptance of an order.|Y
01|232789|15|1|A tariff surcharge may be added to this quotation in|Y
01|232789|15|2|the event of a sustained tariff increase on the|Y
01|232789|15|3|importation of this product.  Any surcharge will be|Y
01|232789|15|4|disclosed prior to acceptance of an order.|Y
01|232791|5|1|A tariff surcharge may be added to this quotation in|Y
01|232791|5|2|the event of a sustained tariff increase on the|Y
01|232791|5|3|importation of this product.  Any surcharge will be|Y
01|232791|5|4|disclosed prior to acceptance of an order.|Y
01|232792|2|1|A tariff surcharge may be added to this quotation in|Y
01|232792|2|2|the event of a sustained tariff increase on the|Y
01|232792|2|3|importation of this product.  Any surcharge will be|Y
01|232792|2|4|disclosed prior to acceptance of an order.|Y
01|232794|5|1|A tariff surcharge may be added to this quotation in|Y
01|232794|5|2|the event of a sustained tariff increase on the|Y
01|232794|5|3|importation of this product.  Any surcharge will be|Y
01|232794|5|4|disclosed prior to acceptance of an order.|Y
01|232795|8|1|A tariff surcharge may be added to this quotation in|Y
01|232795|8|2|the event of a sustained tariff increase on the|Y
01|232795|8|3|importation of this product.  Any surcharge will be|Y
01|232795|8|4|disclosed prior to acceptance of an order.|Y
01|232796|12|1|A tariff surcharge may be added to this quotation in|Y
01|232796|12|2|the event of a sustained tariff increase on the|Y
01|232796|12|3|importation of this product.  Any surcharge will be|Y
01|232796|12|4|disclosed prior to acceptance of an order.|Y
01|232798|2|1|A tariff surcharge may be added to this quotation in|Y
01|232798|2|2|the event of a sustained tariff increase on the|Y
01|232798|2|3|importation of this product.  Any surcharge will be|Y
01|232798|2|4|disclosed prior to acceptance of an order.|Y
01|232799|3|1|A tariff surcharge may be added to this quotation in|Y
01|232799|3|2|the event of a sustained tariff increase on the|Y
01|232799|3|3|importation of this product.  Any surcharge will be|Y
01|232799|3|4|disclosed prior to acceptance of an order.|Y
01|232800|3|1|A tariff surcharge may be added to this quotation in|Y
01|232800|3|2|the event of a sustained tariff increase on the|Y
01|232800|3|3|importation of this product.  Any surcharge will be|Y
01|232800|3|4|disclosed prior to acceptance of an order.|Y
01|232801|2|1|A tariff surcharge may be added to this quotation in|Y
01|232801|2|2|the event of a sustained tariff increase on the|Y
01|232801|2|3|importation of this product.  Any surcharge will be|Y
01|232801|2|4|disclosed prior to acceptance of an order.|Y
01|232802|2|1|A tariff surcharge may be added to this quotation in|Y
01|232802|2|2|the event of a sustained tariff increase on the|Y
01|232802|2|3|importation of this product.  Any surcharge will be|Y
01|232802|2|4|disclosed prior to acceptance of an order.|Y
01|232803|3|1|A tariff surcharge may be added to this quotation in|Y
01|232803|3|2|the event of a sustained tariff increase on the|Y
01|232803|3|3|importation of this product.  Any surcharge will be|Y
01|232803|3|4|disclosed prior to acceptance of an order.|Y
01|232804|10|1|A tariff surcharge may be added to this quotation in|Y
01|232804|10|2|the event of a sustained tariff increase on the|Y
01|232804|10|3|importation of this product.  Any surcharge will be|Y
01|232804|10|4|disclosed prior to acceptance of an order.|Y
01|232805|2|1|A tariff surcharge may be added to this quotation in|Y
01|232805|2|2|the event of a sustained tariff increase on the|Y
01|232805|2|3|importation of this product.  Any surcharge will be|Y
01|232805|2|4|disclosed prior to acceptance of an order.|Y
01|232806|2|1|A tariff surcharge may be added to this quotation in|Y
01|232806|2|2|the event of a sustained tariff increase on the|Y
01|232806|2|3|importation of this product.  Any surcharge will be|Y
01|232806|2|4|disclosed prior to acceptance of an order.|Y
01|232807|4|1|A tariff surcharge may be added to this quotation in|Y
01|232807|4|2|the event of a sustained tariff increase on the|Y
01|232807|4|3|importation of this product.  Any surcharge will be|Y
01|232807|4|4|disclosed prior to acceptance of an order.|Y
01|232808|2|1|A tariff surcharge may be added to this quotation in|Y
01|232808|2|2|the event of a sustained tariff increase on the|Y
01|232808|2|3|importation of this product.  Any surcharge will be|Y
01|232808|2|4|disclosed prior to acceptance of an order.|Y
01|232809|2|1|A tariff surcharge may be added to this quotation in|Y
01|232809|2|2|the event of a sustained tariff increase on the|Y
01|232809|2|3|importation of this product.  Any surcharge will be|Y
01|232809|2|4|disclosed prior to acceptance of an order.|Y
01|232810|2|1|A tariff surcharge may be added to this quotation in|Y
01|232810|2|2|the event of a sustained tariff increase on the|Y
01|232810|2|3|importation of this product.  Any surcharge will be|Y
01|232810|2|4|disclosed prior to acceptance of an order.|Y
01|232811|2|1|A tariff surcharge may be added to this quotation in|Y
01|232811|2|2|the event of a sustained tariff increase on the|Y
01|232811|2|3|importation of this product.  Any surcharge will be|Y
01|232811|2|4|disclosed prior to acceptance of an order.|Y
01|232812|2|1|A tariff surcharge may be added to this quotation in|Y
01|232812|2|2|the event of a sustained tariff increase on the|Y
01|232812|2|3|importation of this product.  Any surcharge will be|Y
01|232812|2|4|disclosed prior to acceptance of an order.|Y
01|232813|2|1|A tariff surcharge may be added to this quotation in|Y
01|232813|2|2|the event of a sustained tariff increase on the|Y
01|232813|2|3|importation of this product.  Any surcharge will be|Y
01|232813|2|4|disclosed prior to acceptance of an order.|Y
01|232814|3|1|A tariff surcharge may be added to this quotation in|Y
01|232814|3|2|the event of a sustained tariff increase on the|Y
01|232814|3|3|importation of this product.  Any surcharge will be|Y
01|232814|3|4|disclosed prior to acceptance of an order.|Y
01|232815|2|1|A tariff surcharge may be added to this quotation in|Y
01|232815|2|2|the event of a sustained tariff increase on the|Y
01|232815|2|3|importation of this product.  Any surcharge will be|Y
01|232815|2|4|disclosed prior to acceptance of an order.|Y
01|232816|1|1|P/N: C6-VC13-90-IDU|Y
01|232816|1|2|Delivery is 6mos. after apporval drawing is signed|Y
01|232816|1|3|and received.|Y
01|232816|2|1|A tariff surcharge may be added to this quotation in|Y
01|232816|2|2|the event of a sustained tariff increase on the|Y
01|232816|2|3|importation of this product.  Any surcharge will be|Y
01|232816|2|4|disclosed prior to acceptance of an order.|Y
01|232817|2|1|A tariff surcharge may be added to this quotation in|Y
01|232817|2|2|the event of a sustained tariff increase on the|Y
01|232817|2|3|importation of this product.  Any surcharge will be|Y
01|232817|2|4|disclosed prior to acceptance of an order.|Y
01|232818|4|1|A tariff surcharge may be added to this quotation in|Y
01|232818|4|2|the event of a sustained tariff increase on the|Y
01|232818|4|3|importation of this product.  Any surcharge will be|Y
01|232818|4|4|disclosed prior to acceptance of an order.|Y
01|232819|2|1|A tariff surcharge may be added to this quotation in|Y
01|232819|2|2|the event of a sustained tariff increase on the|Y
01|232819|2|3|importation of this product.  Any surcharge will be|Y
01|232819|2|4|disclosed prior to acceptance of an order.|Y
01|232820|2|1|A tariff surcharge may be added to this quotation in|Y
01|232820|2|2|the event of a sustained tariff increase on the|Y
01|232820|2|3|importation of this product.  Any surcharge will be|Y
01|232820|2|4|disclosed prior to acceptance of an order.|Y
01|232821|2|1|A tariff surcharge may be added to this quotation in|Y
01|232821|2|2|the event of a sustained tariff increase on the|Y
01|232821|2|3|importation of this product.  Any surcharge will be|Y
01|232821|2|4|disclosed prior to acceptance of an order.|Y
01|232822|2|1|A tariff surcharge may be added to this quotation in|Y
01|232822|2|2|the event of a sustained tariff increase on the|Y
01|232822|2|3|importation of this product.  Any surcharge will be|Y
01|232822|2|4|disclosed prior to acceptance of an order.|Y
01|232823|3|1|A tariff surcharge may be added to this quotation in|Y
01|232823|3|2|the event of a sustained tariff increase on the|Y
01|232823|3|3|importation of this product.  Any surcharge will be|Y
01|232823|3|4|disclosed prior to acceptance of an order.|Y
01|232824|2|1|A tariff surcharge may be added to this quotation in|Y
01|232824|2|2|the event of a sustained tariff increase on the|Y
01|232824|2|3|importation of this product.  Any surcharge will be|Y
01|232824|2|4|disclosed prior to acceptance of an order.|Y
01|232825|2|1|A tariff surcharge may be added to this quotation in|Y
01|232825|2|2|the event of a sustained tariff increase on the|Y
01|232825|2|3|importation of this product.  Any surcharge will be|Y
01|232825|2|4|disclosed prior to acceptance of an order.|Y
01|232826|5|1|A tariff surcharge may be added to this quotation in|Y
01|232826|5|2|the event of a sustained tariff increase on the|Y
01|232826|5|3|importation of this product.  Any surcharge will be|Y
01|232826|5|4|disclosed prior to acceptance of an order.|Y
01|232827|2|1|A tariff surcharge may be added to this quotation in|Y
01|232827|2|2|the event of a sustained tariff increase on the|Y
01|232827|2|3|importation of this product.  Any surcharge will be|Y
01|232827|2|4|disclosed prior to acceptance of an order.|Y
01|232828|14|1|A tariff surcharge may be added to this quotation in|Y
01|232828|14|2|the event of a sustained tariff increase on the|Y
01|232828|14|3|importation of this product.  Any surcharge will be|Y
01|232828|14|4|disclosed prior to acceptance of an order.|Y
01|232829|2|1|A tariff surcharge may be added to this quotation in|Y
01|232829|2|2|the event of a sustained tariff increase on the|Y
01|232829|2|3|importation of this product.  Any surcharge will be|Y
01|232829|2|4|disclosed prior to acceptance of an order.|Y
01|232830|2|1|A tariff surcharge may be added to this quotation in|Y
01|232830|2|2|the event of a sustained tariff increase on the|Y
01|232830|2|3|importation of this product.  Any surcharge will be|Y
01|232830|2|4|disclosed prior to acceptance of an order.|Y
01|232831|3|1|A tariff surcharge may be added to this quotation in|Y
01|232831|3|2|the event of a sustained tariff increase on the|Y
01|232831|3|3|importation of this product.  Any surcharge will be|Y
01|232831|3|4|disclosed prior to acceptance of an order.|Y
01|232832|2|1|A tariff surcharge may be added to this quotation in|Y
01|232832|2|2|the event of a sustained tariff increase on the|Y
01|232832|2|3|importation of this product.  Any surcharge will be|Y
01|232832|2|4|disclosed prior to acceptance of an order.|Y
01|232833|2|1|A tariff surcharge may be added to this quotation in|Y
01|232833|2|2|the event of a sustained tariff increase on the|Y
01|232833|2|3|importation of this product.  Any surcharge will be|Y
01|232833|2|4|disclosed prior to acceptance of an order.|Y
01|232834|2|1|A tariff surcharge may be added to this quotation in|Y
01|232834|2|2|the event of a sustained tariff increase on the|Y
01|232834|2|3|importation of this product.  Any surcharge will be|Y
01|232834|2|4|disclosed prior to acceptance of an order.|Y
01|232835|4|1|A tariff surcharge may be added to this quotation in|Y
01|232835|4|2|the event of a sustained tariff increase on the|Y
01|232835|4|3|importation of this product.  Any surcharge will be|Y
01|232835|4|4|disclosed prior to acceptance of an order.|Y
01|232836|11|1|A tariff surcharge may be added to this quotation in|Y
01|232836|11|2|the event of a sustained tariff increase on the|Y
01|232836|11|3|importation of this product.  Any surcharge will be|Y
01|232836|11|4|disclosed prior to acceptance of an order.|Y
01|232837|2|1|A tariff surcharge may be added to this quotation in|Y
01|232837|2|2|the event of a sustained tariff increase on the|Y
01|232837|2|3|importation of this product.  Any surcharge will be|Y
01|232837|2|4|disclosed prior to acceptance of an order.|Y
01|232838|2|1|A tariff surcharge may be added to this quotation in|Y
01|232838|2|2|the event of a sustained tariff increase on the|Y
01|232838|2|3|importation of this product.  Any surcharge will be|Y
01|232838|2|4|disclosed prior to acceptance of an order.|Y
01|232839|2|1|A tariff surcharge may be added to this quotation in|Y
01|232839|2|2|the event of a sustained tariff increase on the|Y
01|232839|2|3|importation of this product.  Any surcharge will be|Y
01|232839|2|4|disclosed prior to acceptance of an order.|Y
01|232840|1|1|REQUIRES MOTOR AND CABLES SUPPLIED BY HFO.|Y
01|232840|1|2|SHIP MOTOR AND CABLES TO L-N FOR TABLE PREPARATION|Y
01|232840|1|3|FOR CM1|Y
01|232840|2|1|A tariff surcharge may be added to this quotation in|Y
01|232840|2|2|the event of a sustained tariff increase on the|Y
01|232840|2|3|importation of this product.  Any surcharge will be|Y
01|232840|2|4|disclosed prior to acceptance of an order.|Y
01|232841|12|1|A tariff surcharge may be added to this quotation in|Y
01|232841|12|2|the event of a sustained tariff increase on the|Y
01|232841|12|3|importation of this product.  Any surcharge will be|Y
01|232841|12|4|disclosed prior to acceptance of an order.|Y
01|232842|22|1|A tariff surcharge may be added to this quotation in|Y
01|232842|22|2|the event of a sustained tariff increase on the|Y
01|232842|22|3|importation of this product. Any surcharge will be|Y
01|232842|22|4|disclosed prior to acceptance of an order.|Y
01|232843|13|1|A tariff surcharge may be added to this quotation in|Y
01|232843|13|2|the event of a sustained tariff increase on the|Y
01|232843|13|3|importation of this product.  Any surcharge will be|Y
01|232843|13|4|disclosed prior to acceptance of an order.|Y
01|232844|2|1|A tariff surcharge may be added to this quotation in|Y
01|232844|2|2|the event of a sustained tariff increase on the|Y
01|232844|2|3|importation of this product.  Any surcharge will be|Y
01|232844|2|4|disclosed prior to acceptance of an order.|Y
01|232845|1|1|20% Discount taken from List Price|Y
01|232845|1|2|List = $7520 ea.|Y
01|232845|3|1|20% Discount taken from List Price|Y
01|232845|3|2|List Price = $4197 ea.|Y
01|232845|4|1|20% Discount taken from List Price|Y
01|232845|4|2|List Price  = $2351 ea.|Y
01|232845|8|1|Receive 20% off of comparable tool with your CORE|Y
01|232845|8|2|tool!  Broken beat whatever!|Y
01|232845|8|3|Provide tool to your local Nikken Representative|Y
01|232845|9|1|A tariff surcharge may be added to this quotation in|Y
01|232845|9|2|the event of a sustained tariff increase on the|Y
01|232845|9|3|importation of this product.  Any surcharge will be|Y
01|232845|9|4|disclosed prior to acceptance of an order.|Y
01|232846|2|1|FOR MILLTRONICS CT40 SPINDLE (KENTURN)|Y
01|232846|2|2|APPROVAL DRAWINGS REQUIRED WITH EU SIGNATURE PRIOR|Y
01|232846|2|3|TO PRODUCTION|Y
01|232846|3|1|A tariff surcharge may be added to this quotation in|Y
01|232846|3|2|the event of a sustained tariff increase on the|Y
01|232846|3|3|importation of this product.  Any surcharge will be|Y
01|232846|3|4|disclosed prior to acceptance of an order.|Y
01|232847|2|1|A tariff surcharge may be added to this quotation in|Y
01|232847|2|2|the event of a sustained tariff increase on the|Y
01|232847|2|3|importation of this product.  Any surcharge will be|Y
01|232847|2|4|disclosed prior to acceptance of an order.|Y
01|232848|2|1|A tariff surcharge may be added to this quotation in|Y
01|232848|2|2|the event of a sustained tariff increase on the|Y
01|232848|2|3|importation of this product.  Any surcharge will be|Y
01|232848|2|4|disclosed prior to acceptance of an order.|Y
01|232849|2|1|A tariff surcharge may be added to this quotation in|Y
01|232849|2|2|the event of a sustained tariff increase on the|Y
01|232849|2|3|importation of this product.  Any surcharge will be|Y
01|232849|2|4|disclosed prior to acceptance of an order.|Y
01|232850|2|1|A tariff surcharge may be added to this quotation in|Y
01|232850|2|2|the event of a sustained tariff increase on the|Y
01|232850|2|3|importation of this product.  Any surcharge will be|Y
01|232850|2|4|disclosed prior to acceptance of an order.|Y
01|232851|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ON|Y
01|232851|3|2|OKUMA M660|Y
01|232851|4|1|TOOL CERT INCLUDED WITH PURCHASE OF ROTARY TABLE|Y
01|232851|5|1|A tariff surcharge may be added to this quotation in|Y
01|232851|5|2|the event of a sustained tariff increase on the|Y
01|232851|5|3|importation of this product.  Any surcharge will be|Y
01|232851|5|4|disclosed prior to acceptance of an order.|Y
01|232852|3|1|A tariff surcharge may be added to this quotation in|Y
01|232852|3|2|the event of a sustained tariff increase on the|Y
01|232852|3|3|importation of this product.  Any surcharge will be|Y
01|232852|3|4|disclosed prior to acceptance of an order.|Y
01|232853|2|1|A tariff surcharge may be added to this quotation in|Y
01|232853|2|2|the event of a sustained tariff increase on the|Y
01|232853|2|3|importation of this product.  Any surcharge will be|Y
01|232853|2|4|disclosed prior to acceptance of an order.|Y
01|232854|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|232854|2|2|FANUC ROBODRILL D21M MACHINE|Y
01|232854|3|1|A tariff surcharge may be added to this quotation in|Y
01|232854|3|2|the event of a sustained tariff increase on the|Y
01|232854|3|3|importation of this product.  Any surcharge will be|Y
01|232854|3|4|disclosed prior to acceptance of an order.|Y
01|232855|2|1|A tariff surcharge may be added to this quotation in|Y
01|232855|2|2|the event of a sustained tariff increase on the|Y
01|232855|2|3|importation of this product.  Any surcharge will be|Y
01|232855|2|4|disclosed prior to acceptance of an order.|Y
01|232856|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|232856|3|1|A tariff surcharge may be added to this quotation in|Y
01|232856|3|2|the event of a sustained tariff increase on the|Y
01|232856|3|3|importation of this product.  Any surcharge will be|Y
01|232856|3|4|disclosed prior to acceptance of an order.|Y
01|232857|6|1|A tariff surcharge may be added to this quotation in|Y
01|232857|6|2|the event of a sustained tariff increase on the|Y
01|232857|6|3|importation of this product.  Any surcharge will be|Y
01|232857|6|4|disclosed prior to acceptance of an order.|Y
01|232858|4|1|A tariff surcharge may be added to this quotation in|Y
01|232858|4|2|the event of a sustained tariff increase on the|Y
01|232858|4|3|importation of this product.  Any surcharge will be|Y
01|232858|4|4|disclosed prior to acceptance of an order.|Y
01|232859|3|1|A tariff surcharge may be added to this quotation in|Y
01|232859|3|2|the event of a sustained tariff increase on the|Y
01|232859|3|3|importation of this product.  Any surcharge will be|Y
01|232859|3|4|disclosed prior to acceptance of an order.|Y
01|232860|3|1|A tariff surcharge may be added to this quotation in|Y
01|232860|3|2|the event of a sustained tariff increase on the|Y
01|232860|3|3|importation of this product.  Any surcharge will be|Y
01|232860|3|4|disclosed prior to acceptance of an order.|Y
01|232861|15|1|A tariff surcharge may be added to this quotation in|Y
01|232861|15|2|the event of a sustained tariff increase on the|Y
01|232861|15|3|importation of this product.  Any surcharge will be|Y
01|232861|15|4|disclosed prior to acceptance of an order.|Y
01|232862|14|1|A tariff surcharge may be added to this quotation in|Y
01|232862|14|2|the event of a sustained tariff increase on the|Y
01|232862|14|3|importation of this product.  Any surcharge will be|Y
01|232862|14|4|disclosed prior to acceptance of an order.|Y
01|232863|16|1|A tariff surcharge may be added to this quotation in|Y
01|232863|16|2|the event of a sustained tariff increase on the|Y
01|232863|16|3|importation of this product.  Any surcharge will be|Y
01|232863|16|4|disclosed prior to acceptance of an order.|Y
01|232864|6|1|A tariff surcharge may be added to this quotation in|Y
01|232864|6|2|the event of a sustained tariff increase on the|Y
01|232864|6|3|importation of this product.  Any surcharge will be|Y
01|232864|6|4|disclosed prior to acceptance of an order.|Y
01|232865|5|1|A tariff surcharge may be added to this quotation in|Y
01|232865|5|2|the event of a sustained tariff increase on the|Y
01|232865|5|3|importation of this product.  Any surcharge will be|Y
01|232865|5|4|disclosed prior to acceptance of an order.|Y
01|232866|30|1|A tariff surcharge may be added to this quotation in|Y
01|232866|30|2|the event of a sustained tariff increase on the|Y
01|232866|30|3|importation of this product.  Any surcharge will be|Y
01|232866|30|4|disclosed prior to acceptance of an order.|Y
01|232867|4|1|A tariff surcharge may be added to this quotation in|Y
01|232867|4|2|the event of a sustained tariff increase on the|Y
01|232867|4|3|importation of this product.  Any surcharge will be|Y
01|232867|4|4|disclosed prior to acceptance of an order.|Y
01|232868|18|1|A tariff surcharge may be added to this quotation in|Y
01|232868|18|2|the event of a sustained tariff increase on the|Y
01|232868|18|3|importation of this product.  Any surcharge will be|Y
01|232868|18|4|disclosed prior to acceptance of an order.|Y
01|232869|8|1|A tariff surcharge may be added to this quotation in|Y
01|232869|8|2|the event of a sustained tariff increase on the|Y
01|232869|8|3|importation of this product.  Any surcharge will be|Y
01|232869|8|4|disclosed prior to acceptance of an order.|Y
01|232870|1|1|1st Batch/Stock 4/11KC:DWG saved in Teams FileMFG5/20U|Y
01|232870|2|1|1st Batch 5/12KC:DWG Saved in Teams FileMFG5/25UPD5/12|Y
01|232871|1|1|T/P Inspection Required  12/16 approved|Y
01|232871|2|1|T/P Inspection Required/(4)998940 (6)1002998|Y
01|232871|3|1|A tariff surcharge may be added to this quotation in|Y
01|232871|3|2|the event of a sustained tariff increase on the|Y
01|232871|3|3|importation of this product.  Any surcharge will be|Y
01|232871|3|4|disclosed prior to acceptance of an order.|Y
01|232872|2|1|A tariff surcharge may be added to this quotation in|Y
01|232872|2|2|the event of a sustained tariff increase on the|Y
01|232872|2|3|importation of this product.  Any surcharge will be|Y
01|232872|2|4|disclosed prior to acceptance of an order.|Y
01|232873|4|1|A tariff surcharge may be added to this quotation in|Y
01|232873|4|2|the event of a sustained tariff increase on the|Y
01|232873|4|3|importation of this product.  Any surcharge will be|Y
01|232873|4|4|disclosed prior to acceptance of an order.|Y
01|232874|2|1|A tariff surcharge may be added to this quotation in|Y
01|232874|2|2|the event of a sustained tariff increase on the|Y
01|232874|2|3|importation of this product.  Any surcharge will be|Y
01|232874|2|4|disclosed prior to acceptance of an order.|Y
01|232875|19|1|A tariff surcharge may be added to this quotation in|Y
01|232875|19|2|the event of a sustained tariff increase on the|Y
01|232875|19|3|importation of this product.  Any surcharge will be|Y
01|232875|19|4|disclosed prior to acceptance of an order.|Y
01|232876|4|1|A tariff surcharge may be added to this quotation in|Y
01|232876|4|2|the event of a sustained tariff increase on the|Y
01|232876|4|3|importation of this product.  Any surcharge will be|Y
01|232876|4|4|disclosed prior to acceptance of an order.|Y
01|232877|3|1|A tariff surcharge may be added to this quotation in|Y
01|232877|3|2|the event of a sustained tariff increase on the|Y
01|232877|3|3|importation of this product.  Any surcharge will be|Y
01|232877|3|4|disclosed prior to acceptance of an order.|Y
01|232878|3|1|A tariff surcharge may be added to this quotation in|Y
01|232878|3|2|the event of a sustained tariff increase on the|Y
01|232878|3|3|importation of this product.  Any surcharge will be|Y
01|232878|3|4|disclosed prior to acceptance of an order.|Y
01|232879|2|1|A tariff surcharge may be added to this quotation in|Y
01|232879|2|2|the event of a sustained tariff increase on the|Y
01|232879|2|3|importation of this product.  Any surcharge will be|Y
01|232879|2|4|disclosed prior to acceptance of an order.|Y
01|232880|3|1|A tariff surcharge may be added to this quotation in|Y
01|232880|3|2|the event of a sustained tariff increase on the|Y
01|232880|3|3|importation of this product.  Any surcharge will be|Y
01|232880|3|4|disclosed prior to acceptance of an order.|Y
01|232881|5|1|Additional 20% Overstock discount added to standard|Y
01|232881|5|2|discount. Final Sale|Y
01|232881|6|1|A tariff surcharge may be added to this quotation in|Y
01|232881|6|2|the event of a sustained tariff increase on the|Y
01|232881|6|3|importation of this product.  Any surcharge will be|Y
01|232881|6|4|disclosed prior to acceptance of an order.|Y
01|232882|3|1|A tariff surcharge may be added to this quotation in|Y
01|232882|3|2|the event of a sustained tariff increase on the|Y
01|232882|3|3|importation of this product.  Any surcharge will be|Y
01|232882|3|4|disclosed prior to acceptance of an order.|Y
01|232883|6|1|A tariff surcharge may be added to this quotation in|Y
01|232883|6|2|the event of a sustained tariff increase on the|Y
01|232883|6|3|importation of this product.  Any surcharge will be|Y
01|232883|6|4|disclosed prior to acceptance of an order.|Y
01|232884|3|1|End support with brake.|Y
01|232884|3|2|Riser required to match the tables center height.|Y
01|232885|2|1|A tariff surcharge may be added to this quotation in|Y
01|232885|2|2|the event of a sustained tariff increase on the|Y
01|232885|2|3|importation of this product.  Any surcharge will be|Y
01|232885|2|4|disclosed prior to acceptance of an order.|Y
01|232886|1|1|RGA#MOD-61900|Y
01|232886|1|2|MODEL:CNC601FA SN:6249|Y
01|232887|4|1|A tariff surcharge may be added to this quotation in|Y
01|232887|4|2|the event of a sustained tariff increase on the|Y
01|232887|4|3|importation of this product.  Any surcharge will be|Y
01|232887|4|4|disclosed prior to acceptance of an order.|Y
01|232888|3|1|A tariff surcharge may be added to this quotation in|Y
01|232888|3|2|the event of a sustained tariff increase on the|Y
01|232888|3|3|importation of this product.  Any surcharge will be|Y
01|232888|3|4|disclosed prior to acceptance of an order.|Y
01|232889|3|1|A tariff surcharge may be added to this quotation in|Y
01|232889|3|2|the event of a sustained tariff increase on the|Y
01|232889|3|3|importation of this product.  Any surcharge will be|Y
01|232889|3|4|disclosed prior to acceptance of an order.|Y
01|232890|3|1|A tariff surcharge may be added to this quotation in|Y
01|232890|3|2|the event of a sustained tariff increase on the|Y
01|232890|3|3|importation of this product.  Any surcharge will be|Y
01|232890|3|4|disclosed prior to acceptance of an order.|Y
01|232891|3|1|A tariff surcharge may be added to this quotation in|Y
01|232891|3|2|the event of a sustained tariff increase on the|Y
01|232891|3|3|importation of this product.  Any surcharge will be|Y
01|232891|3|4|disclosed prior to acceptance of an order.|Y
01|232892|5|1|A tariff surcharge may be added to this quotation in|Y
01|232892|5|2|the event of a sustained tariff increase on the|Y
01|232892|5|3|importation of this product.  Any surcharge will be|Y
01|232892|5|4|disclosed prior to acceptance of an order.|Y
01|232893|6|1|A tariff surcharge may be added to this quotation in|Y
01|232893|6|2|the event of a sustained tariff increase on the|Y
01|232893|6|3|importation of this product.  Any surcharge will be|Y
01|232893|6|4|disclosed prior to acceptance of an order.|Y
01|232894|2|1|A tariff surcharge may be added to this quotation in|Y
01|232894|2|2|the event of a sustained tariff increase on the|Y
01|232894|2|3|importation of this product.  Any surcharge will be|Y
01|232894|2|4|disclosed prior to acceptance of an order.|Y
01|232895|2|1|A tariff surcharge may be added to this quotation in|Y
01|232895|2|2|the event of a sustained tariff increase on the|Y
01|232895|2|3|importation of this product.  Any surcharge will be|Y
01|232895|2|4|disclosed prior to acceptance of an order.|Y
01|232896|3|1|A tariff surcharge may be added to this quotation in|Y
01|232896|3|2|the event of a sustained tariff increase on the|Y
01|232896|3|3|importation of this product.  Any surcharge will be|Y
01|232896|3|4|disclosed prior to acceptance of an order.|Y
01|232897|2|1|A tariff surcharge may be added to this quotation in|Y
01|232897|2|2|the event of a sustained tariff increase on the|Y
01|232897|2|3|importation of this product.  Any surcharge will be|Y
01|232897|2|4|disclosed prior to acceptance of an order.|Y
01|232898|2|1|A tariff surcharge may be added to this quotation in|Y
01|232898|2|2|the event of a sustained tariff increase on the|Y
01|232898|2|3|importation of this product.  Any surcharge will be|Y
01|232898|2|4|disclosed prior to acceptance of an order.|Y
01|232899|3|1|A tariff surcharge may be added to this quotation in|Y
01|232899|3|2|the event of a sustained tariff increase on the|Y
01|232899|3|3|importation of this product.  Any surcharge will be|Y
01|232899|3|4|disclosed prior to acceptance of an order.|Y
01|232900|3|1|A tariff surcharge may be added to this quotation in|Y
01|232900|3|2|the event of a sustained tariff increase on the|Y
01|232900|3|3|importation of this product.  Any surcharge will be|Y
01|232900|3|4|disclosed prior to acceptance of an order.|Y
01|232901|2|1|A tariff surcharge may be added to this quotation in|Y
01|232901|2|2|the event of a sustained tariff increase on the|Y
01|232901|2|3|importation of this product.  Any surcharge will be|Y
01|232901|2|4|disclosed prior to acceptance of an order.|Y
01|232902|4|1|A tariff surcharge may be added to this quotation in|Y
01|232902|4|2|the event of a sustained tariff increase on the|Y
01|232902|4|3|importation of this product.  Any surcharge will be|Y
01|232902|4|4|disclosed prior to acceptance of an order.|Y
01|232904|5|1|A tariff surcharge may be added to this quotation in|Y
01|232904|5|2|the event of a sustained tariff increase on the|Y
01|232904|5|3|importation of this product.  Any surcharge will be|Y
01|232904|5|4|disclosed prior to acceptance of an order.|Y
01|232905|3|1|A tariff surcharge may be added to this quotation in|Y
01|232905|3|2|the event of a sustained tariff increase on the|Y
01|232905|3|3|importation of this product.  Any surcharge will be|Y
01|232905|3|4|disclosed prior to acceptance of an order.|Y
01|232906|2|1|A tariff surcharge may be added to this quotation in|Y
01|232906|2|2|the event of a sustained tariff increase on the|Y
01|232906|2|3|importation of this product.  Any surcharge will be|Y
01|232906|2|4|disclosed prior to acceptance of an order.|Y
01|232907|2|1|A tariff surcharge may be added to this quotation in|Y
01|232907|2|2|the event of a sustained tariff increase on the|Y
01|232907|2|3|importation of this product.  Any surcharge will be|Y
01|232907|2|4|disclosed prior to acceptance of an order.|Y
01|232908|7|1|A tariff surcharge may be added to this quotation in|Y
01|232908|7|2|the event of a sustained tariff increase on the|Y
01|232908|7|3|importation of this product.  Any surcharge will be|Y
01|232908|7|4|disclosed prior to acceptance of an order.|Y
01|232910|6|1|A tariff surcharge may be added to this quotation in|Y
01|232910|6|2|the event of a sustained tariff increase on the|Y
01|232910|6|3|importation of this product.  Any surcharge will be|Y
01|232910|6|4|disclosed prior to acceptance of an order.|Y
01|232911|1|1|Part Number: HSK100A-BLANK-18.00|Y
01|232911|1|2|HSK100A Blank Bar x 18|Y
01|232911|1|3|*Lead time given as ADA - After Signed Drawing Approval|Y
01|232911|1|4|Please allow 1-2 weeks for procurement of approval dwg.|Y
01|232911|2|1|A tariff surcharge may be added to this quotation in|Y
01|232911|2|2|the event of a sustained tariff increase on the|Y
01|232911|2|3|importation of this product.  Any surcharge will be|Y
01|232911|2|4|disclosed prior to acceptance of an order.|Y
01|232912|3|1|A tariff surcharge may be added to this quotation in|Y
01|232912|3|2|the event of a sustained tariff increase on the|Y
01|232912|3|3|importation of this product.  Any surcharge will be|Y
01|232912|3|4|disclosed prior to acceptance of an order.|Y
01|232913|3|1|A tariff surcharge may be added to this quotation in|Y
01|232913|3|2|the event of a sustained tariff increase on the|Y
01|232913|3|3|importation of this product.  Any surcharge will be|Y
01|232913|3|4|disclosed prior to acceptance of an order.|Y
01|232915|2|1|A tariff surcharge may be added to this quotation in|Y
01|232915|2|2|the event of a sustained tariff increase on the|Y
01|232915|2|3|importation of this product.  Any surcharge will be|Y
01|232915|2|4|disclosed prior to acceptance of an order.|Y
01|232916|2|1|A tariff surcharge may be added to this quotation in|Y
01|232916|2|2|the event of a sustained tariff increase on the|Y
01|232916|2|3|importation of this product.  Any surcharge will be|Y
01|232916|2|4|disclosed prior to acceptance of an order.|Y
01|232917|2|1|Wrench for HSK63A-VC6-90|Y
01|232917|4|1|Bearing wrench for HSK63A-C1-100G-IDU|Y
01|232917|5|1|Spanner Wrench for HSK63A-C1-100G-IDU|Y
01|232917|6|1|A tariff surcharge may be added to this quotation in|Y
01|232917|6|2|the event of a sustained tariff increase on the|Y
01|232917|6|3|importation of this product.  Any surcharge will be|Y
01|232917|6|4|disclosed prior to acceptance of an order.|Y
01|232918|2|1|A tariff surcharge may be added to this quotation in|Y
01|232918|2|2|the event of a sustained tariff increase on the|Y
01|232918|2|3|importation of this product.  Any surcharge will be|Y
01|232918|2|4|disclosed prior to acceptance of an order.|Y
01|232919|2|1|CNC401BAR21 with backhand mounted motor and Nikken|Y
01|232919|2|2|AR21 control.|Y
01|232919|5|1|A tariff surcharge may be added to this quotation in|Y
01|232919|5|2|the event of a sustained tariff increase on the|Y
01|232919|5|3|importation of this product.  Any surcharge will be|Y
01|232919|5|4|disclosed prior to acceptance of an order.|Y
01|232920|2|1|A tariff surcharge may be added to this quotation in|Y
01|232920|2|2|the event of a sustained tariff increase on the|Y
01|232920|2|3|importation of this product.  Any surcharge will be|Y
01|232920|2|4|disclosed prior to acceptance of an order.|Y
01|232921|1|1|T/P Inspection Required7/M B|Y
01|232921|6|1|A tariff surcharge may be added to this quotation in|Y
01|232921|6|2|the event of a sustained tariff increase on the|Y
01|232921|6|3|importation of this product.  Any surcharge will be|Y
01|232921|6|4|disclosed prior to acceptance of an order.|Y
01|232922|3|1|A tariff surcharge may be added to this quotation in|Y
01|232922|3|2|the event of a sustained tariff increase on the|Y
01|232922|3|3|importation of this product.  Any surcharge will be|Y
01|232922|3|4|disclosed prior to acceptance of an order.|Y
01|232923|1|1|Please note this is a discontinued item.|Y
01|232923|1|2|Cannot be cancelled or returned upon receipt of PO.|Y
01|232923|2|1|A tariff surcharge may be added to this quotation in|Y
01|232923|2|2|the event of a sustained tariff increase on the|Y
01|232923|2|3|importation of this product.  Any surcharge will be|Y
01|232923|2|4|disclosed prior to acceptance of an order.|Y
01|232924|2|1|A tariff surcharge may be added to this quotation in|Y
01|232924|2|2|the event of a sustained tariff increase on the|Y
01|232924|2|3|importation of this product.  Any surcharge will be|Y
01|232924|2|4|disclosed prior to acceptance of an order.|Y
01|232925|2|1|A tariff surcharge may be added to this quotation in|Y
01|232925|2|2|the event of a sustained tariff increase on the|Y
01|232925|2|3|importation of this product.  Any surcharge will be|Y
01|232925|2|4|disclosed prior to acceptance of an order.|Y
01|232926|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|232926|3|1|A tariff surcharge may be added to this quotation in|Y
01|232926|3|2|the event of a sustained tariff increase on the|Y
01|232926|3|3|importation of this product.  Any surcharge will be|Y
01|232926|3|4|disclosed prior to acceptance of an order.|Y
01|232927|1|1|MNL12-ER40X-ICE w/ 3/4 base thickness.|Y
01|232927|1|2|Special custom item: Cannot be cancelled or returned|Y
01|232927|1|3|upon receipt of PO. **NET Pricing**|Y
01|232927|2|1|A tariff surcharge may be added to this quotation in|Y
01|232927|2|2|the event of a sustained tariff increase on the|Y
01|232927|2|3|importation of this product.  Any surcharge will be|Y
01|232927|2|4|disclosed prior to acceptance of an order.|Y
01|232928|4|1|A tariff surcharge may be added to this quotation in|Y
01|232928|4|2|the event of a sustained tariff increase on the|Y
01|232928|4|3|importation of this product.  Any surcharge will be|Y
01|232928|4|4|disclosed prior to acceptance of an order.|Y
01|232929|2|1|A tariff surcharge may be added to this quotation in|Y
01|232929|2|2|the event of a sustained tariff increase on the|Y
01|232929|2|3|importation of this product.  Any surcharge will be|Y
01|232929|2|4|disclosed prior to acceptance of an order.|Y
01|232930|36|1|A tariff surcharge may be added to this quotation in|Y
01|232930|36|2|the event of a sustained tariff increase on the|Y
01|232930|36|3|importation of this product.  Any surcharge will be|Y
01|232930|36|4|disclosed prior to acceptance of an order.|Y
01|232931|8|1|A tariff surcharge may be added to this quotation in|Y
01|232931|8|2|the event of a sustained tariff increase on the|Y
01|232931|8|3|importation of this product.  Any surcharge will be|Y
01|232931|8|4|disclosed prior to acceptance of an order.|Y
01|232932|4|1|A tariff surcharge may be added to this quotation in|Y
01|232932|4|2|the event of a sustained tariff increase on the|Y
01|232932|4|3|importation of this product.  Any surcharge will be|Y
01|232932|4|4|disclosed prior to acceptance of an order.|Y
01|232933|2|1|A tariff surcharge may be added to this quotation in|Y
01|232933|2|2|the event of a sustained tariff increase on the|Y
01|232933|2|3|importation of this product.  Any surcharge will be|Y
01|232933|2|4|disclosed prior to acceptance of an order.|Y
01|232934|7|1|A tariff surcharge may be added to this quotation in|Y
01|232934|7|2|the event of a sustained tariff increase on the|Y
01|232934|7|3|importation of this product.  Any surcharge will be|Y
01|232934|7|4|disclosed prior to acceptance of an order.|Y
01|232935|34|1|A tariff surcharge may be added to this quotation in|Y
01|232935|34|2|the event of a sustained tariff increase on the|Y
01|232935|34|3|importation of this product.  Any surcharge will be|Y
01|232935|34|4|disclosed prior to acceptance of an order.|Y
01|232936|3|1|A tariff surcharge may be added to this quotation in|Y
01|232936|3|2|the event of a sustained tariff increase on the|Y
01|232936|3|3|importation of this product.  Any surcharge will be|Y
01|232936|3|4|disclosed prior to acceptance of an order.|Y
01|232937|1|1|Req.INS/Check PS. PS-N46AE? Will RETURN to NIKKEN|Y
01|232937|2|1|Req.INS/Inst'd on NC5-46-C16-120 Will Return to NIKKEN|Y
01|232937|3|1|A tariff surcharge may be added to this quotation in|Y
01|232937|3|2|the event of a sustained tariff increase on the|Y
01|232937|3|3|importation of this product.  Any surcharge will be|Y
01|232937|3|4|disclosed prior to acceptance of an order.|Y
01|232938|2|1|A tariff surcharge may be added to this quotation in|Y
01|232938|2|2|the event of a sustained tariff increase on the|Y
01|232938|2|3|importation of this product.  Any surcharge will be|Y
01|232938|2|4|disclosed prior to acceptance of an order.|Y
01|232939|2|1|A tariff surcharge may be added to this quotation in|Y
01|232939|2|2|the event of a sustained tariff increase on the|Y
01|232939|2|3|importation of this product.  Any surcharge will be|Y
01|232939|2|4|disclosed prior to acceptance of an order.|Y
01|232940|2|1|A tariff surcharge may be added to this quotation in|Y
01|232940|2|2|the event of a sustained tariff increase on the|Y
01|232940|2|3|importation of this product.  Any surcharge will be|Y
01|232940|2|4|disclosed prior to acceptance of an order.|Y
01|232941|2|1|A tariff surcharge may be added to this quotation in|Y
01|232941|2|2|the event of a sustained tariff increase on the|Y
01|232941|2|3|importation of this product.  Any surcharge will be|Y
01|232941|2|4|disclosed prior to acceptance of an order.|Y
01|232942|2|1|A tariff surcharge may be added to this quotation in|Y
01|232942|2|2|the event of a sustained tariff increase on the|Y
01|232942|2|3|importation of this product.  Any surcharge will be|Y
01|232942|2|4|disclosed prior to acceptance of an order.|Y
01|232943|15|1|A tariff surcharge may be added to this quotation in|Y
01|232943|15|2|the event of a sustained tariff increase on the|Y
01|232943|15|3|importation of this product.  Any surcharge will be|Y
01|232943|15|4|disclosed prior to acceptance of an order.|Y
01|232945|2|1|A tariff surcharge may be added to this quotation in|Y
01|232945|2|2|the event of a sustained tariff increase on the|Y
01|232945|2|3|importation of this product.  Any surcharge will be|Y
01|232945|2|4|disclosed prior to acceptance of an order.|Y
01|232946|2|1|A tariff surcharge may be added to this quotation in|Y
01|232946|2|2|the event of a sustained tariff increase on the|Y
01|232946|2|3|importation of this product.  Any surcharge will be|Y
01|232946|2|4|disclosed prior to acceptance of an order.|Y
01|232947|2|1|A tariff surcharge may be added to this quotation in|Y
01|232947|2|2|the event of a sustained tariff increase on the|Y
01|232947|2|3|importation of this product.  Any surcharge will be|Y
01|232947|2|4|disclosed prior to acceptance of an order.|Y
01|232948|2|1|A tariff surcharge may be added to this quotation in|Y
01|232948|2|2|the event of a sustained tariff increase on the|Y
01|232948|2|3|importation of this product.  Any surcharge will be|Y
01|232948|2|4|disclosed prior to acceptance of an order.|Y
01|232949|2|1|**non-cancellable non-returnable**|Y
01|232949|5|1|A tariff surcharge may be added to this quotation in|Y
01|232949|5|2|the event of a sustained tariff increase on the|Y
01|232949|5|3|importation of this product.  Any surcharge will be|Y
01|232949|5|4|disclosed prior to acceptance of an order.|Y
01|232950|16|1|A tariff surcharge may be added to this quotation in|Y
01|232950|16|2|the event of a sustained tariff increase on the|Y
01|232950|16|3|importation of this product.  Any surcharge will be|Y
01|232950|16|4|disclosed prior to acceptance of an order.|Y
01|232952|3|1|A tariff surcharge may be added to this quotation in|Y
01|232952|3|2|the event of a sustained tariff increase on the|Y
01|232952|3|3|importation of this product.  Any surcharge will be|Y
01|232952|3|4|disclosed prior to acceptance of an order.|Y
01|232953|5|1|A tariff surcharge may be added to this quotation in|Y
01|232953|5|2|the event of a sustained tariff increase on the|Y
01|232953|5|3|importation of this product.  Any surcharge will be|Y
01|232953|5|4|disclosed prior to acceptance of an order.|Y
01|232954|3|1|A tariff surcharge may be added to this quotation in|Y
01|232954|3|2|the event of a sustained tariff increase on the|Y
01|232954|3|3|importation of this product.  Any surcharge will be|Y
01|232954|3|4|disclosed prior to acceptance of an order.|Y
01|232955|3|1|A tariff surcharge may be added to this quotation in|Y
01|232955|3|2|the event of a sustained tariff increase on the|Y
01|232955|3|3|importation of this product.  Any surcharge will be|Y
01|232955|3|4|disclosed prior to acceptance of an order.|Y
01|232956|7|1|A tariff surcharge may be added to this quotation in|Y
01|232956|7|2|the event of a sustained tariff increase on the|Y
01|232956|7|3|importation of this product.  Any surcharge will be|Y
01|232956|7|4|disclosed prior to acceptance of an order.|Y
01|232957|11|1|A tariff surcharge may be added to this quotation in|Y
01|232957|11|2|the event of a sustained tariff increase on the|Y
01|232957|11|3|importation of this product.  Any surcharge will be|Y
01|232957|11|4|disclosed prior to acceptance of an order.|Y
01|232958|5|1|A tariff surcharge may be added to this quotation in|Y
01|232958|5|2|the event of a sustained tariff increase on the|Y
01|232958|5|3|importation of this product.  Any surcharge will be|Y
01|232958|5|4|disclosed prior to acceptance of an order.|Y
01|232959|2|1|A tariff surcharge may be added to this quotation in|Y
01|232959|2|2|the event of a sustained tariff increase on the|Y
01|232959|2|3|importation of this product.  Any surcharge will be|Y
01|232959|2|4|disclosed prior to acceptance of an order.|Y
01|232960|2|1|A tariff surcharge may be added to this quotation in|Y
01|232960|2|2|the event of a sustained tariff increase on the|Y
01|232960|2|3|importation of this product.  Any surcharge will be|Y
01|232960|2|4|disclosed prior to acceptance of an order.|Y
01|232961|8|1|A tariff surcharge may be added to this quotation in|Y
01|232961|8|2|the event of a sustained tariff increase on the|Y
01|232961|8|3|importation of this product.  Any surcharge will be|Y
01|232961|8|4|disclosed prior to acceptance of an order.|Y
01|232962|2|1|A tariff surcharge may be added to this quotation in|Y
01|232962|2|2|the event of a sustained tariff increase on the|Y
01|232962|2|3|importation of this product.  Any surcharge will be|Y
01|232962|2|4|disclosed prior to acceptance of an order.|Y
01|232963|2|1|A tariff surcharge may be added to this quotation in|Y
01|232963|2|2|the event of a sustained tariff increase on the|Y
01|232963|2|3|importation of this product.  Any surcharge will be|Y
01|232963|2|4|disclosed prior to acceptance of an order.|Y
01|232964|3|1|Includes Balluff Chip P/N: BIS-C-122-04/L (BIS0011)|Y
01|232964|3|2|Install and rebalance after install|Y
01|232964|4|1|A tariff surcharge may be added to this quotation in|Y
01|232964|4|2|the event of a sustained tariff increase on the|Y
01|232964|4|3|importation of this product.  Any surcharge will be|Y
01|232964|4|4|disclosed prior to acceptance of an order.|Y
01|232965|6|1|A tariff surcharge may be added to this quotation in|Y
01|232965|6|2|the event of a sustained tariff increase on the|Y
01|232965|6|3|importation of this product.  Any surcharge will be|Y
01|232965|6|4|disclosed prior to acceptance of an order.|Y
01|232966|3|1|A tariff surcharge may be added to this quotation in|Y
01|232966|3|2|the event of a sustained tariff increase on the|Y
01|232966|3|3|importation of this product.  Any surcharge will be|Y
01|232966|3|4|disclosed prior to acceptance of an order.|Y
01|232967|14|1|A tariff surcharge may be added to this quotation in|Y
01|232967|14|2|the event of a sustained tariff increase on the|Y
01|232967|14|3|importation of this product.  Any surcharge will be|Y
01|232967|14|4|disclosed prior to acceptance of an order.|Y
01|232968|12|1|A tariff surcharge may be added to this quotation in|Y
01|232968|12|2|the event of a sustained tariff increase on the|Y
01|232968|12|3|importation of this product.  Any surcharge will be|Y
01|232968|12|4|disclosed prior to acceptance of an order.|Y
01|232969|7|1|A tariff surcharge may be added to this quotation in|Y
01|232969|7|2|the event of a sustained tariff increase on the|Y
01|232969|7|3|importation of this product.  Any surcharge will be|Y
01|232969|7|4|disclosed prior to acceptance of an order.|Y
01|232970|2|1|A tariff surcharge may be added to this quotation in|Y
01|232970|2|2|the event of a sustained tariff increase on the|Y
01|232970|2|3|importation of this product.  Any surcharge will be|Y
01|232970|2|4|disclosed prior to acceptance of an order.|Y
01|232971|3|1|A tariff surcharge may be added to this quotation in|Y
01|232971|3|2|the event of a sustained tariff increase on the|Y
01|232971|3|3|importation of this product.  Any surcharge will be|Y
01|232971|3|4|disclosed prior to acceptance of an order.|Y
01|232973|3|1|A tariff surcharge may be added to this quotation in|Y
01|232973|3|2|the event of a sustained tariff increase on the|Y
01|232973|3|3|importation of this product.  Any surcharge will be|Y
01|232973|3|4|disclosed prior to acceptance of an order.|Y
01|232974|2|1|A tariff surcharge may be added to this quotation in|Y
01|232974|2|2|the event of a sustained tariff increase on the|Y
01|232974|2|3|importation of this product.  Any surcharge will be|Y
01|232974|2|4|disclosed prior to acceptance of an order.|Y
01|232975|1|1|Currently have three (3) in stock.  Estimated lead|Y
01|232975|1|2|time for the one (1) additional item is 11~12 weeks|Y
01|232975|1|3|after receipt of an order.|Y
01|232975|2|1|A tariff surcharge may be added to this quotation in|Y
01|232975|2|2|the event of a sustained tariff increase on the|Y
01|232975|2|3|importation of this product.  Any surcharge will be|Y
01|232975|2|4|disclosed prior to acceptance of an order.|Y
01|232976|2|1|A tariff surcharge may be added to this quotation in|Y
01|232976|2|2|the event of a sustained tariff increase on the|Y
01|232976|2|3|importation of this product.  Any surcharge will be|Y
01|232976|2|4|disclosed prior to acceptance of an order.|Y
01|232977|2|1|A tariff surcharge may be added to this quotation in|Y
01|232977|2|2|the event of a sustained tariff increase on the|Y
01|232977|2|3|importation of this product.  Any surcharge will be|Y
01|232977|2|4|disclosed prior to acceptance of an order.|Y
01|232978|4|1|A tariff surcharge may be added to this quotation in|Y
01|232978|4|2|the event of a sustained tariff increase on the|Y
01|232978|4|3|importation of this product.  Any surcharge will be|Y
01|232978|4|4|disclosed prior to acceptance of an order.|Y
01|232979|5|1|A tariff surcharge may be added to this quotation in|Y
01|232979|5|2|the event of a sustained tariff increase on the|Y
01|232979|5|3|importation of this product.  Any surcharge will be|Y
01|232979|5|4|disclosed prior to acceptance of an order.|Y
01|232980|1|1|Part Number: TBD|Y
01|232980|1|2|CAT40 1/8 End Mill Holder Gage Length: 4.5Symmetrical|Y
01|232980|1|3|Drive Keys w/ Depth to follow K value. No IDChipHole|Y
01|232980|1|4|*Lead time given as ADA - After Signed Drawing Approval|Y
01|232980|1|5|Please allow 1-2 weeks for completion of approval dwg.|Y
01|232980|2|1|A tariff surcharge may be added to this quotation in|Y
01|232980|2|2|the event of a sustained tariff increase on the|Y
01|232980|2|3|importation of this product.  Any surcharge will be|Y
01|232980|2|4|disclosed prior to acceptance of an order.|Y
01|232981|1|1|RGA#TAR-61886|Y
01|232981|1|2|5AX-2MT-130-170BAHFA-M SN: 8306|Y
01|232981|47|1|A tariff surcharge may be added to this quotation in|Y
01|232981|47|2|the event of a sustained tariff increase on the|Y
01|232981|47|3|importation of this product.  Any surcharge will be|Y
01|232981|47|4|disclosed prior to acceptance of an order.|Y
01|232982|4|1|A tariff surcharge may be added to this quotation in|Y
01|232982|4|2|the event of a sustained tariff increase on the|Y
01|232982|4|3|importation of this product.  Any surcharge will be|Y
01|232982|4|4|disclosed prior to acceptance of an order.|Y
01|232983|2|1|A tariff surcharge may be added to this quotation in|Y
01|232983|2|2|the event of a sustained tariff increase on the|Y
01|232983|2|3|importation of this product.  Any surcharge will be|Y
01|232983|2|4|disclosed prior to acceptance of an order.|Y
01|232984|2|1|A tariff surcharge may be added to this quotation in|Y
01|232984|2|2|the event of a sustained tariff increase on the|Y
01|232984|2|3|importation of this product.  Any surcharge will be|Y
01|232984|2|4|disclosed prior to acceptance of an order.|Y
01|232985|3|1|Please Note: Net price includes the cost of the|Y
01|232985|3|2|BIS-M-122-02/A and etching of Pratts # PT979557REV-|Y
01|232985|3|3|on holder and packaging.|Y
01|232985|4|1|A tariff surcharge may be added to this quotation in|Y
01|232985|4|2|the event of a sustained tariff increase on the|Y
01|232985|4|3|importation of this product.  Any surcharge will be|Y
01|232985|4|4|disclosed prior to acceptance of an order.|Y
01|232986|2|1|A tariff surcharge may be added to this quotation in|Y
01|232986|2|2|the event of a sustained tariff increase on the|Y
01|232986|2|3|importation of this product.  Any surcharge will be|Y
01|232986|2|4|disclosed prior to acceptance of an order.|Y
01|232987|1|1|Special pricing for CMX1100 includes installation|Y
01|232987|2|1|Special pricing for CMX1100 new orders.|Y
01|232987|2|2|Table to be installed at Davis|Y
01|232988|2|1|A tariff surcharge may be added to this quotation in|Y
01|232988|2|2|the event of a sustained tariff increase on the|Y
01|232988|2|3|importation of this product.  Any surcharge will be|Y
01|232988|2|4|disclosed prior to acceptance of an order.|Y
01|232989|11|1|A tariff surcharge may be added to this quotation in|Y
01|232989|11|2|the event of a sustained tariff increase on the|Y
01|232989|11|3|importation of this product.  Any surcharge will be|Y
01|232989|11|4|disclosed prior to acceptance of an order.|Y
01|232990|3|1|A tariff surcharge may be added to this quotation in|Y
01|232990|3|2|the event of a sustained tariff increase on the|Y
01|232990|3|3|importation of this product.  Any surcharge will be|Y
01|232990|3|4|disclosed prior to acceptance of an order.|Y
01|232991|2|1|A tariff surcharge may be added to this quotation in|Y
01|232991|2|2|the event of a sustained tariff increase on the|Y
01|232991|2|3|importation of this product.  Any surcharge will be|Y
01|232991|2|4|disclosed prior to acceptance of an order.|Y
01|232992|5|1|A tariff surcharge may be added to this quotation in|Y
01|232992|5|2|the event of a sustained tariff increase on the|Y
01|232992|5|3|importation of this product.  Any surcharge will be|Y
01|232992|5|4|disclosed prior to acceptance of an order.|Y
01|232993|3|1|A tariff surcharge may be added to this quotation in|Y
01|232993|3|2|the event of a sustained tariff increase on the|Y
01|232993|3|3|importation of this product.  Any surcharge will be|Y
01|232993|3|4|disclosed prior to acceptance of an order.|Y
01|232994|16|1|A tariff surcharge may be added to this quotation in|Y
01|232994|16|2|the event of a sustained tariff increase on the|Y
01|232994|16|3|importation of this product.  Any surcharge will be|Y
01|232994|16|4|disclosed prior to acceptance of an order.|Y
01|232995|11|1|Alternative to 5/32A (SK10-4 is not on size)|Y
01|232995|25|1|A tariff surcharge may be added to this quotation in|Y
01|232995|25|2|the event of a sustained tariff increase on the|Y
01|232995|25|3|importation of this product.  Any surcharge will be|Y
01|232995|25|4|disclosed prior to acceptance of an order.|Y
01|232996|3|1|A tariff surcharge may be added to this quotation in|Y
01|232996|3|2|the event of a sustained tariff increase on the|Y
01|232996|3|3|importation of this product.  Any surcharge will be|Y
01|232996|3|4|disclosed prior to acceptance of an order.|Y
01|232997|9|1|A tariff surcharge may be added to this quotation in|Y
01|232997|9|2|the event of a sustained tariff increase on the|Y
01|232997|9|3|importation of this product.  Any surcharge will be|Y
01|232997|9|4|disclosed prior to acceptance of an order.|Y
01|232998|-13|1|A tariff surcharge may be added to this quotation in|Y
01|232998|-13|2|the event of a sustained tariff increase on the|Y
01|232998|-13|3|importation of this product.  Any surcharge will be|Y
01|232998|-13|4|disclosed prior to acceptance of an order.|Y
01|232999|2|1|Additional 20% Overstock discount was added to your|Y
01|232999|2|2|standard 32%.  This item is FINAL SALE.|Y
01|232999|5|1|A tariff surcharge may be added to this quotation in|Y
01|232999|5|2|the event of a sustained tariff increase on the|Y
01|232999|5|3|importation of this product.  Any surcharge will be|Y
01|232999|5|4|disclosed prior to acceptance of an order.|Y
01|233000|-13|1|A tariff surcharge may be added to this quotation in|Y
01|233000|-13|2|the event of a sustained tariff increase on the|Y
01|233000|-13|3|importation of this product.  Any surcharge will be|Y
01|233000|-13|4|disclosed prior to acceptance of an order.|Y
01|233001|3|1|A tariff surcharge may be added to this quotation in|Y
01|233001|3|2|the event of a sustained tariff increase on the|Y
01|233001|3|3|importation of this product.  Any surcharge will be|Y
01|233001|3|4|disclosed prior to acceptance of an order.|Y
01|233002|13|1|A tariff surcharge may be added to this quotation in|Y
01|233002|13|2|the event of a sustained tariff increase on the|Y
01|233002|13|3|importation of this product.  Any surcharge will be|Y
01|233002|13|4|disclosed prior to acceptance of an order.|Y
01|233003|4|1|A tariff surcharge may be added to this quotation in|Y
01|233003|4|2|the event of a sustained tariff increase on the|Y
01|233003|4|3|importation of this product.  Any surcharge will be|Y
01|233003|4|4|disclosed prior to acceptance of an order.|Y
01|233004|3|1|A tariff surcharge may be added to this quotation in|Y
01|233004|3|2|the event of a sustained tariff increase on the|Y
01|233004|3|3|importation of this product.  Any surcharge will be|Y
01|233004|3|4|disclosed prior to acceptance of an order.|Y
01|233005|2|1|A tariff surcharge may be added to this quotation in|Y
01|233005|2|2|the event of a sustained tariff increase on the|Y
01|233005|2|3|importation of this product.  Any surcharge will be|Y
01|233005|2|4|disclosed prior to acceptance of an order.|Y
01|233006|1|1|RGA#TAR-61925|Y
01|233006|1|2|CNC260LFA-M SN: 15530|Y
01|233006|4|1|A tariff surcharge may be added to this quotation in|Y
01|233006|4|2|the event of a sustained tariff increase on the|Y
01|233006|4|3|importation of this product.  Any surcharge will be|Y
01|233006|4|4|disclosed prior to acceptance of an order.|Y
01|233007|7|1|A tariff surcharge may be added to this quotation in|Y
01|233007|7|2|the event of a sustained tariff increase on the|Y
01|233007|7|3|importation of this product.  Any surcharge will be|Y
01|233007|7|4|disclosed prior to acceptance of an order.|Y
01|233008|15|1|A tariff surcharge may be added to this quotation in|Y
01|233008|15|2|the event of a sustained tariff increase on the|Y
01|233008|15|3|importation of this product.  Any surcharge will be|Y
01|233008|15|4|disclosed prior to acceptance of an order.|Y
01|233009|2|1|A tariff surcharge may be added to this quotation in|Y
01|233009|2|2|the event of a sustained tariff increase on the|Y
01|233009|2|3|importation of this product.  Any surcharge will be|Y
01|233009|2|4|disclosed prior to acceptance of an order.|Y
01|233010|2|1|A tariff surcharge may be added to this quotation in|Y
01|233010|2|2|the event of a sustained tariff increase on the|Y
01|233010|2|3|importation of this product.  Any surcharge will be|Y
01|233010|2|4|disclosed prior to acceptance of an order.|Y
01|233011|2|1|A tariff surcharge may be added to this quotation in|Y
01|233011|2|2|the event of a sustained tariff increase on the|Y
01|233011|2|3|importation of this product.  Any surcharge will be|Y
01|233011|2|4|disclosed prior to acceptance of an order.|Y
01|233012|2|1|A tariff surcharge may be added to this quotation in|Y
01|233012|2|2|the event of a sustained tariff increase on the|Y
01|233012|2|3|importation of this product.  Any surcharge will be|Y
01|233012|2|4|disclosed prior to acceptance of an order.|Y
01|233013|5|1|A tariff surcharge may be added to this quotation in|Y
01|233013|5|2|the event of a sustained tariff increase on the|Y
01|233013|5|3|importation of this product.  Any surcharge will be|Y
01|233013|5|4|disclosed prior to acceptance of an order.|Y
01|233014|2|1|A tariff surcharge may be added to this quotation in|Y
01|233014|2|2|the event of a sustained tariff increase on the|Y
01|233014|2|3|importation of this product.  Any surcharge will be|Y
01|233014|2|4|disclosed prior to acceptance of an order.|Y
01|233015|2|1|A tariff surcharge may be added to this quotation in|Y
01|233015|2|2|the event of a sustained tariff increase on the|Y
01|233015|2|3|importation of this product.  Any surcharge will be|Y
01|233015|2|4|disclosed prior to acceptance of an order.|Y
01|233016|4|1|A tariff surcharge may be added to this quotation in|Y
01|233016|4|2|the event of a sustained tariff increase on the|Y
01|233016|4|3|importation of this product.  Any surcharge will be|Y
01|233016|4|4|disclosed prior to acceptance of an order.|Y
01|233017|5|1|A tariff surcharge may be added to this quotation in|Y
01|233017|5|2|the event of a sustained tariff increase on the|Y
01|233017|5|3|importation of this product.  Any surcharge will be|Y
01|233017|5|4|disclosed prior to acceptance of an order.|Y
01|233018|1|1|P/N: LCH-BUSHING1.1/2-25|Y
01|233018|1|2|Type C Bushing OD 1.1/2 ID 25mm|Y
01|233018|2|1|A tariff surcharge may be added to this quotation in|Y
01|233018|2|2|the event of a sustained tariff increase on the|Y
01|233018|2|3|importation of this product.  Any surcharge will be|Y
01|233018|2|4|disclosed prior to acceptance of an order.|Y
01|233019|4|1|A tariff surcharge may be added to this quotation in|Y
01|233019|4|2|the event of a sustained tariff increase on the|Y
01|233019|4|3|importation of this product.  Any surcharge will be|Y
01|233019|4|4|disclosed prior to acceptance of an order.|Y
01|233020|3|1|A tariff surcharge may be added to this quotation in|Y
01|233020|3|2|the event of a sustained tariff increase on the|Y
01|233020|3|3|importation of this product.  Any surcharge will be|Y
01|233020|3|4|disclosed prior to acceptance of an order.|Y
01|233021|1|1|RGA#MOD-61900|Y
01|233021|1|2|TAT-500 SN:2500|Y
01|233021|15|1|A tariff surcharge may be added to this quotation in|Y
01|233021|15|2|the event of a sustained tariff increase on the|Y
01|233021|15|3|importation of this product.  Any surcharge will be|Y
01|233021|15|4|disclosed prior to acceptance of an order.|Y
01|233022|3|1|A tariff surcharge may be added to this quotation in|Y
01|233022|3|2|the event of a sustained tariff increase on the|Y
01|233022|3|3|importation of this product.  Any surcharge will be|Y
01|233022|3|4|disclosed prior to acceptance of an order.|Y
01|233023|1|1|*No Installation No RS-232C Cable|Y
01|233023|4|1|A tariff surcharge may be added to this quotation in|Y
01|233023|4|2|the event of a sustained tariff increase on the|Y
01|233023|4|3|importation of this product.  Any surcharge will be|Y
01|233023|4|4|disclosed prior to acceptance of an order.|Y
01|233024|2|1|Modification includes: ID Chip Hole Balluff Chip|Y
01|233024|2|2|P/N: BIS-C-122-04/L (BIS0011) Chip Install and|Y
01|233024|2|3|After install rebalance holder.|Y
01|233024|2|4|Final P/N: HSK100A-HC1000-115-IDI|Y
01|233024|3|1|A tariff surcharge may be added to this quotation in|Y
01|233024|3|2|the event of a sustained tariff increase on the|Y
01|233024|3|3|importation of this product.  Any surcharge will be|Y
01|233024|3|4|disclosed prior to acceptance of an order.|Y
01|233025|3|1|A tariff surcharge may be added to this quotation in|Y
01|233025|3|2|the event of a sustained tariff increase on the|Y
01|233025|3|3|importation of this product.  Any surcharge will be|Y
01|233025|3|4|disclosed prior to acceptance of an order.|Y
01|233026|2|1|A tariff surcharge may be added to this quotation in|Y
01|233026|2|2|the event of a sustained tariff increase on the|Y
01|233026|2|3|importation of this product.  Any surcharge will be|Y
01|233026|2|4|disclosed prior to acceptance of an order.|Y
01|233027|3|1|A tariff surcharge may be added to this quotation in|Y
01|233027|3|2|the event of a sustained tariff increase on the|Y
01|233027|3|3|importation of this product.  Any surcharge will be|Y
01|233027|3|4|disclosed prior to acceptance of an order.|Y
01|233028|5|1|A tariff surcharge may be added to this quotation in|Y
01|233028|5|2|the event of a sustained tariff increase on the|Y
01|233028|5|3|importation of this product.  Any surcharge will be|Y
01|233028|5|4|disclosed prior to acceptance of an order.|Y
01|233029|5|1|A tariff surcharge may be added to this quotation in|Y
01|233029|5|2|the event of a sustained tariff increase on the|Y
01|233029|5|3|importation of this product.  Any surcharge will be|Y
01|233029|5|4|disclosed prior to acceptance of an order.|Y
01|233030|7|1|A tariff surcharge may be added to this quotation in|Y
01|233030|7|2|the event of a sustained tariff increase on the|Y
01|233030|7|3|importation of this product.  Any surcharge will be|Y
01|233030|7|4|disclosed prior to acceptance of an order.|Y
01|233031|2|1|A tariff surcharge may be added to this quotation in|Y
01|233031|2|2|the event of a sustained tariff increase on the|Y
01|233031|2|3|importation of this product.  Any surcharge will be|Y
01|233031|2|4|disclosed prior to acceptance of an order.|Y
01|233032|2|1|A tariff surcharge may be added to this quotation in|Y
01|233032|2|2|the event of a sustained tariff increase on the|Y
01|233032|2|3|importation of this product.  Any surcharge will be|Y
01|233032|2|4|disclosed prior to acceptance of an order.|Y
01|233033|11|1|A tariff surcharge may be added to this quotation in|Y
01|233033|11|2|the event of a sustained tariff increase on the|Y
01|233033|11|3|importation of this product.  Any surcharge will be|Y
01|233033|11|4|disclosed prior to acceptance of an order.|Y
01|233034|2|1|A tariff surcharge may be added to this quotation in|Y
01|233034|2|2|the event of a sustained tariff increase on the|Y
01|233034|2|3|importation of this product.  Any surcharge will be|Y
01|233034|2|4|disclosed prior to acceptance of an order.|Y
01|233035|1|1|Similar Mimatic drawing # 00056554 /customer sketch|Y
01|233035|2|1|Similar Mimatic drawing # 00056554 /customer sketch|Y
01|233035|3|1|A tariff surcharge may be added to this quotation in|Y
01|233035|3|2|the event of a sustained tariff increase on the|Y
01|233035|3|3|importation of this product.  Any surcharge will be|Y
01|233035|3|4|disclosed prior to acceptance of an order.|Y
01|233037|2|1|A tariff surcharge may be added to this quotation in|Y
01|233037|2|2|the event of a sustained tariff increase on the|Y
01|233037|2|3|importation of this product.  Any surcharge will be|Y
01|233037|2|4|disclosed prior to acceptance of an order.|Y
01|233038|2|1|A tariff surcharge may be added to this quotation in|Y
01|233038|2|2|the event of a sustained tariff increase on the|Y
01|233038|2|3|importation of this product.  Any surcharge will be|Y
01|233038|2|4|disclosed prior to acceptance of an order.|Y
01|233039|3|1|A tariff surcharge may be added to this quotation in|Y
01|233039|3|2|the event of a sustained tariff increase on the|Y
01|233039|3|3|importation of this product.  Any surcharge will be|Y
01|233039|3|4|disclosed prior to acceptance of an order.|Y
01|233040|6|1|A tariff surcharge may be added to this quotation in|Y
01|233040|6|2|the event of a sustained tariff increase on the|Y
01|233040|6|3|importation of this product.  Any surcharge will be|Y
01|233040|6|4|disclosed prior to acceptance of an order.|Y
01|233041|2|1|A tariff surcharge may be added to this quotation in|Y
01|233041|2|2|the event of a sustained tariff increase on the|Y
01|233041|2|3|importation of this product.  Any surcharge will be|Y
01|233041|2|4|disclosed prior to acceptance of an order.|Y
01|233042|2|1|A tariff surcharge may be added to this quotation in|Y
01|233042|2|2|the event of a sustained tariff increase on the|Y
01|233042|2|3|importation of this product.  Any surcharge will be|Y
01|233042|2|4|disclosed prior to acceptance of an order.|Y
01|233043|11|1|A tariff surcharge may be added to this quotation in|Y
01|233043|11|2|the event of a sustained tariff increase on the|Y
01|233043|11|3|importation of this product.  Any surcharge will be|Y
01|233043|11|4|disclosed prior to acceptance of an order.|Y
01|233044|3|1|A tariff surcharge may be added to this quotation in|Y
01|233044|3|2|the event of a sustained tariff increase on the|Y
01|233044|3|3|importation of this product.  Any surcharge will be|Y
01|233044|3|4|disclosed prior to acceptance of an order.|Y
01|233045|2|1|A tariff surcharge may be added to this quotation in|Y
01|233045|2|2|the event of a sustained tariff increase on the|Y
01|233045|2|3|importation of this product.  Any surcharge will be|Y
01|233045|2|4|disclosed prior to acceptance of an order.|Y
01|233046|4|1|Please Note: Overstock discount of an extra 20% added|Y
01|233046|4|2|to the discount. We have 5 each remaining and then|Y
01|233046|4|3|this item will be discontinued.|Y
01|233046|5|1|A tariff surcharge may be added to this quotation in|Y
01|233046|5|2|the event of a sustained tariff increase on the|Y
01|233046|5|3|importation of this product.  Any surcharge will be|Y
01|233046|5|4|disclosed prior to acceptance of an order.|Y
01|233047|2|1|A tariff surcharge may be added to this quotation in|Y
01|233047|2|2|the event of a sustained tariff increase on the|Y
01|233047|2|3|importation of this product.  Any surcharge will be|Y
01|233047|2|4|disclosed prior to acceptance of an order.|Y
01|233048|8|1|A tariff surcharge may be added to this quotation in|Y
01|233048|8|2|the event of a sustained tariff increase on the|Y
01|233048|8|3|importation of this product.  Any surcharge will be|Y
01|233048|8|4|disclosed prior to acceptance of an order.|Y
01|233049|2|1|A tariff surcharge may be added to this quotation in|Y
01|233049|2|2|the event of a sustained tariff increase on the|Y
01|233049|2|3|importation of this product.  Any surcharge will be|Y
01|233049|2|4|disclosed prior to acceptance of an order.|Y
01|233050|10|1|A tariff surcharge may be added to this quotation in|Y
01|233050|10|2|the event of a sustained tariff increase on the|Y
01|233050|10|3|importation of this product.  Any surcharge will be|Y
01|233050|10|4|disclosed prior to acceptance of an order.|Y
01|233051|3|1|A tariff surcharge may be added to this quotation in|Y
01|233051|3|2|the event of a sustained tariff increase on the|Y
01|233051|3|3|importation of this product.  Any surcharge will be|Y
01|233051|3|4|disclosed prior to acceptance of an order.|Y
01|233052|1|1|Cheersun BOAT #05082501-B: No INS Req'd.|Y
01|233052|2|1|Cheersun BOAT #05082501-B: No INS Req'd.|Y
01|233052|3|1|Cheersun BOAT #05082501-B: No INS Req'd.|Y
01|233052|4|1|Cheersun BOAT #05082501-B: No INS Req'd.|Y
01|233052|5|1|Cheersun BOAT #05082501-B: No INS Req'd.|Y
01|233052|6|1|Cheersun BOAT #05082501-B: No INS Req'd.|Y
01|233052|7|1|Cheersun BOAT #05082501-B: No INS Req'd.|Y
01|233052|8|1|A tariff surcharge may be added to this quotation in|Y
01|233052|8|2|the event of a sustained tariff increase on the|Y
01|233052|8|3|importation of this product.  Any surcharge will be|Y
01|233052|8|4|disclosed prior to acceptance of an order.|Y
01|233053|6|1|A tariff surcharge may be added to this quotation in|Y
01|233053|6|2|the event of a sustained tariff increase on the|Y
01|233053|6|3|importation of this product.  Any surcharge will be|Y
01|233053|6|4|disclosed prior to acceptance of an order.|Y
01|233054|3|1|A tariff surcharge may be added to this quotation in|Y
01|233054|3|2|the event of a sustained tariff increase on the|Y
01|233054|3|3|importation of this product.  Any surcharge will be|Y
01|233054|3|4|disclosed prior to acceptance of an order.|Y
01|233055|1|1|Estimated lead time is the end of June/beginning of|Y
01|233055|1|2|July.|Y
01|233055|7|1|A tariff surcharge may be added to this quotation in|Y
01|233055|7|2|the event of a sustained tariff increase on the|Y
01|233055|7|3|importation of this product.  Any surcharge will be|Y
01|233055|7|4|disclosed prior to acceptance of an order.|Y
01|233056|5|1|A tariff surcharge may be added to this quotation in|Y
01|233056|5|2|the event of a sustained tariff increase on the|Y
01|233056|5|3|importation of this product.  Any surcharge will be|Y
01|233056|5|4|disclosed prior to acceptance of an order.|Y
01|233057|4|1|NSK RA-100|Y
01|233057|4|2|Item is non-standard stock. This cannot be cancelled or|Y
01|233057|4|3|returned.|Y
01|233057|7|1|A tariff surcharge may be added to this quotation in|Y
01|233057|7|2|the event of a sustained tariff increase on the|Y
01|233057|7|3|importation of this product.  Any surcharge will be|Y
01|233057|7|4|disclosed prior to acceptance of an order.|Y
01|233058|10|1|A tariff surcharge may be added to this quotation in|Y
01|233058|10|2|the event of a sustained tariff increase on the|Y
01|233058|10|3|importation of this product.  Any surcharge will be|Y
01|233058|10|4|disclosed prior to acceptance of an order.|Y
01|233059|2|1|A tariff surcharge may be added to this quotation in|Y
01|233059|2|2|the event of a sustained tariff increase on the|Y
01|233059|2|3|importation of this product.  Any surcharge will be|Y
01|233059|2|4|disclosed prior to acceptance of an order.|Y
01|233060|1|1|Delivery: 9 STOCK 5 ETA 6/5 Balance ~4 wks ARO|Y
01|233060|2|1|A tariff surcharge may be added to this quotation in|Y
01|233060|2|2|the event of a sustained tariff increase on the|Y
01|233060|2|3|importation of this product.  Any surcharge will be|Y
01|233060|2|4|disclosed prior to acceptance of an order.|Y
01|233061|2|1|A tariff surcharge may be added to this quotation in|Y
01|233061|2|2|the event of a sustained tariff increase on the|Y
01|233061|2|3|importation of this product.  Any surcharge will be|Y
01|233061|2|4|disclosed prior to acceptance of an order.|Y
01|233062|10|1|A tariff surcharge may be added to this quotation in|Y
01|233062|10|2|the event of a sustained tariff increase on the|Y
01|233062|10|3|importation of this product.  Any surcharge will be|Y
01|233062|10|4|disclosed prior to acceptance of an order.|Y
01|233063|3|1|A tariff surcharge may be added to this quotation in|Y
01|233063|3|2|the event of a sustained tariff increase on the|Y
01|233063|3|3|importation of this product.  Any surcharge will be|Y
01|233063|3|4|disclosed prior to acceptance of an order.|Y
01|233064|1|1|BT40-SK13-180|Y
01|233064|1|2|BT40 Slim Chuck SK13 15K 180mm G/l|Y
01|233064|3|1|A tariff surcharge may be added to this quotation in|Y
01|233064|3|2|the event of a sustained tariff increase on the|Y
01|233064|3|3|importation of this product.  Any surcharge will be|Y
01|233064|3|4|disclosed prior to acceptance of an order.|Y
01|233065|1|1|Delivery: 1 pc in stock remainder 4.5-5 Months|Y
01|233065|5|1|A tariff surcharge may be added to this quotation in|Y
01|233065|5|2|the event of a sustained tariff increase on the|Y
01|233065|5|3|importation of this product.  Any surcharge will be|Y
01|233065|5|4|disclosed prior to acceptance of an order.|Y
01|233066|4|1|A tariff surcharge may be added to this quotation in|Y
01|233066|4|2|the event of a sustained tariff increase on the|Y
01|233066|4|3|importation of this product.  Any surcharge will be|Y
01|233066|4|4|disclosed prior to acceptance of an order.|Y
01|233067|2|1|A tariff surcharge may be added to this quotation in|Y
01|233067|2|2|the event of a sustained tariff increase on the|Y
01|233067|2|3|importation of this product.  Any surcharge will be|Y
01|233067|2|4|disclosed prior to acceptance of an order.|Y
01|233068|2|1|A tariff surcharge may be added to this quotation in|Y
01|233068|2|2|the event of a sustained tariff increase on the|Y
01|233068|2|3|importation of this product.  Any surcharge will be|Y
01|233068|2|4|disclosed prior to acceptance of an order.|Y
01|233069|2|1|A tariff surcharge may be added to this quotation in|Y
01|233069|2|2|the event of a sustained tariff increase on the|Y
01|233069|2|3|importation of this product.  Any surcharge will be|Y
01|233069|2|4|disclosed prior to acceptance of an order.|Y
01|233070|3|1|A tariff surcharge may be added to this quotation in|Y
01|233070|3|2|the event of a sustained tariff increase on the|Y
01|233070|3|3|importation of this product.  Any surcharge will be|Y
01|233070|3|4|disclosed prior to acceptance of an order.|Y
01|233071|7|1|A tariff surcharge may be added to this quotation in|Y
01|233071|7|2|the event of a sustained tariff increase on the|Y
01|233071|7|3|importation of this product.  Any surcharge will be|Y
01|233071|7|4|disclosed prior to acceptance of an order.|Y
01|233072|2|1|A tariff surcharge may be added to this quotation in|Y
01|233072|2|2|the event of a sustained tariff increase on the|Y
01|233072|2|3|importation of this product.  Any surcharge will be|Y
01|233072|2|4|disclosed prior to acceptance of an order.|Y
01|233073|2|1|A tariff surcharge may be added to this quotation in|Y
01|233073|2|2|the event of a sustained tariff increase on the|Y
01|233073|2|3|importation of this product.  Any surcharge will be|Y
01|233073|2|4|disclosed prior to acceptance of an order.|Y
01|233074|8|1|A tariff surcharge may be added to this quotation in|Y
01|233074|8|2|the event of a sustained tariff increase on the|Y
01|233074|8|3|importation of this product.  Any surcharge will be|Y
01|233074|8|4|disclosed prior to acceptance of an order.|Y
01|233075|2|1|A tariff surcharge may be added to this quotation in|Y
01|233075|2|2|the event of a sustained tariff increase on the|Y
01|233075|2|3|importation of this product.  Any surcharge will be|Y
01|233075|2|4|disclosed prior to acceptance of an order.|Y
01|233076|2|1|A tariff surcharge may be added to this quotation in|Y
01|233076|2|2|the event of a sustained tariff increase on the|Y
01|233076|2|3|importation of this product.  Any surcharge will be|Y
01|233076|2|4|disclosed prior to acceptance of an order.|Y
01|233077|10|1|A tariff surcharge may be added to this quotation in|Y
01|233077|10|2|the event of a sustained tariff increase on the|Y
01|233077|10|3|importation of this product.  Any surcharge will be|Y
01|233077|10|4|disclosed prior to acceptance of an order.|Y
01|233078|2|1|A tariff surcharge may be added to this quotation in|Y
01|233078|2|2|the event of a sustained tariff increase on the|Y
01|233078|2|3|importation of this product.  Any surcharge will be|Y
01|233078|2|4|disclosed prior to acceptance of an order.|Y
01|233079|3|1|A tariff surcharge may be added to this quotation in|Y
01|233079|3|2|the event of a sustained tariff increase on the|Y
01|233079|3|3|importation of this product.  Any surcharge will be|Y
01|233079|3|4|disclosed prior to acceptance of an order.|Y
01|233080|2|1|A tariff surcharge may be added to this quotation in|Y
01|233080|2|2|the event of a sustained tariff increase on the|Y
01|233080|2|3|importation of this product.  Any surcharge will be|Y
01|233080|2|4|disclosed prior to acceptance of an order.|Y
01|233081|1|1|5AX-B450FA-RJ8+1P-RCN+CZ SN:3535|Y
01|233081|1|2|Machine: VCX500 MAJ0696|Y
01|233081|1|3|Tilt side overhaul repair|Y
01|233081|20|1|A tariff surcharge may be added to this quotation in|Y
01|233081|20|2|the event of a sustained tariff increase on the|Y
01|233081|20|3|importation of this product.  Any surcharge will be|Y
01|233081|20|4|disclosed prior to acceptance of an order.|Y
01|233082|2|1|A tariff surcharge may be added to this quotation in|Y
01|233082|2|2|the event of a sustained tariff increase on the|Y
01|233082|2|3|importation of this product.  Any surcharge will be|Y
01|233082|2|4|disclosed prior to acceptance of an order.|Y
01|233084|3|1|A tariff surcharge may be added to this quotation in|Y
01|233084|3|2|the event of a sustained tariff increase on the|Y
01|233084|3|3|importation of this product.  Any surcharge will be|Y
01|233084|3|4|disclosed prior to acceptance of an order.|Y
01|233085|3|1|A tariff surcharge may be added to this quotation in|Y
01|233085|3|2|the event of a sustained tariff increase on the|Y
01|233085|3|3|importation of this product.  Any surcharge will be|Y
01|233085|3|4|disclosed prior to acceptance of an order.|Y
01|233086|23|1|Replaces part# SKN-10B|Y
01|233086|39|1|A tariff surcharge may be added to this quotation in|Y
01|233086|39|2|the event of a sustained tariff increase on the|Y
01|233086|39|3|importation of this product.  Any surcharge will be|Y
01|233086|39|4|disclosed prior to acceptance of an order.|Y
01|233087|2|1|A tariff surcharge may be added to this quotation in|Y
01|233087|2|2|the event of a sustained tariff increase on the|Y
01|233087|2|3|importation of this product.  Any surcharge will be|Y
01|233087|2|4|disclosed prior to acceptance of an order.|Y
01|233088|2|1|A tariff surcharge may be added to this quotation in|Y
01|233088|2|2|the event of a sustained tariff increase on the|Y
01|233088|2|3|importation of this product.  Any surcharge will be|Y
01|233088|2|4|disclosed prior to acceptance of an order.|Y
01|233089|11|1|A tariff surcharge may be added to this quotation in|Y
01|233089|11|2|the event of a sustained tariff increase on the|Y
01|233089|11|3|importation of this product.  Any surcharge will be|Y
01|233089|11|4|disclosed prior to acceptance of an order.|Y
01|233090|2|1|A tariff surcharge may be added to this quotation in|Y
01|233090|2|2|the event of a sustained tariff increase on the|Y
01|233090|2|3|importation of this product.  Any surcharge will be|Y
01|233090|2|4|disclosed prior to acceptance of an order.|Y
01|233091|14|1|A tariff surcharge may be added to this quotation in|Y
01|233091|14|2|the event of a sustained tariff increase on the|Y
01|233091|14|3|importation of this product.  Any surcharge will be|Y
01|233091|14|4|disclosed prior to acceptance of an order.|Y
01|233092|3|1|A tariff surcharge may be added to this quotation in|Y
01|233092|3|2|the event of a sustained tariff increase on the|Y
01|233092|3|3|importation of this product.  Any surcharge will be|Y
01|233092|3|4|disclosed prior to acceptance of an order.|Y
01|233093|2|1|A tariff surcharge may be added to this quotation in|Y
01|233093|2|2|the event of a sustained tariff increase on the|Y
01|233093|2|3|importation of this product.  Any surcharge will be|Y
01|233093|2|4|disclosed prior to acceptance of an order.|Y
01|233094|16|1|A tariff surcharge may be added to this quotation in|Y
01|233094|16|2|the event of a sustained tariff increase on the|Y
01|233094|16|3|importation of this product.  Any surcharge will be|Y
01|233094|16|4|disclosed prior to acceptance of an order.|Y
01|233095|3|1|A tariff surcharge may be added to this quotation in|Y
01|233095|3|2|the event of a sustained tariff increase on the|Y
01|233095|3|3|importation of this product.  Any surcharge will be|Y
01|233095|3|4|disclosed prior to acceptance of an order.|Y
01|233096|2|1|A tariff surcharge may be added to this quotation in|Y
01|233096|2|2|the event of a sustained tariff increase on the|Y
01|233096|2|3|importation of this product.  Any surcharge will be|Y
01|233096|2|4|disclosed prior to acceptance of an order.|Y
01|233097|1|1|RGA#TOR-61881/|Y
01|233097|1|2|Repair of C5005-0875 #1|Y
01|233097|7|1|RGA#TOR-61881/|Y
01|233097|7|2|Repair of C5005-0875 #2|Y
01|233097|10|1|RGA#TOR-61881/|Y
01|233097|10|2|Repair of S1005-0875-9.05|Y
01|233097|13|1|A tariff surcharge may be added to this quotation in|Y
01|233097|13|2|the event of a sustained tariff increase on the|Y
01|233097|13|3|importation of this product.  Any surcharge will be|Y
01|233097|13|4|disclosed prior to acceptance of an order.|Y
01|233098|7|1|A tariff surcharge may be added to this quotation in|Y
01|233098|7|2|the event of a sustained tariff increase on the|Y
01|233098|7|3|importation of this product.  Any surcharge will be|Y
01|233098|7|4|disclosed prior to acceptance of an order.|Y
01|233099|4|1|A tariff surcharge may be added to this quotation in|Y
01|233099|4|2|the event of a sustained tariff increase on the|Y
01|233099|4|3|importation of this product.  Any surcharge will be|Y
01|233099|4|4|disclosed prior to acceptance of an order.|Y
01|233100|2|1|A tariff surcharge may be added to this quotation in|Y
01|233100|2|2|the event of a sustained tariff increase on the|Y
01|233100|2|3|importation of this product.  Any surcharge will be|Y
01|233100|2|4|disclosed prior to acceptance of an order.|Y
01|233101|3|1|A tariff surcharge may be added to this quotation in|Y
01|233101|3|2|the event of a sustained tariff increase on the|Y
01|233101|3|3|importation of this product.  Any surcharge will be|Y
01|233101|3|4|disclosed prior to acceptance of an order.|Y
01|233102|2|1|A tariff surcharge may be added to this quotation in|Y
01|233102|2|2|the event of a sustained tariff increase on the|Y
01|233102|2|3|importation of this product.  Any surcharge will be|Y
01|233102|2|4|disclosed prior to acceptance of an order.|Y
01|233103|6|1|A tariff surcharge may be added to this quotation in|Y
01|233103|6|2|the event of a sustained tariff increase on the|Y
01|233103|6|3|importation of this product.  Any surcharge will be|Y
01|233103|6|4|disclosed prior to acceptance of an order.|Y
01|233104|3|1|A tariff surcharge may be added to this quotation in|Y
01|233104|3|2|the event of a sustained tariff increase on the|Y
01|233104|3|3|importation of this product.  Any surcharge will be|Y
01|233104|3|4|disclosed prior to acceptance of an order.|Y
01|233105|2|1|A tariff surcharge may be added to this quotation in|Y
01|233105|2|2|the event of a sustained tariff increase on the|Y
01|233105|2|3|importation of this product.  Any surcharge will be|Y
01|233105|2|4|disclosed prior to acceptance of an order.|Y
01|233106|3|1|A tariff surcharge may be added to this quotation in|Y
01|233106|3|2|the event of a sustained tariff increase on the|Y
01|233106|3|3|importation of this product.  Any surcharge will be|Y
01|233106|3|4|disclosed prior to acceptance of an order.|Y
01|233107|8|1|A tariff surcharge may be added to this quotation in|Y
01|233107|8|2|the event of a sustained tariff increase on the|Y
01|233107|8|3|importation of this product.  Any surcharge will be|Y
01|233107|8|4|disclosed prior to acceptance of an order.|Y
01|233108|4|1|Please note this is a non-standard stock item and|Y
01|233108|4|2|considered special. Once a PO has been issued item|Y
01|233108|4|3|cannot be cancelled or returned.|Y
01|233108|9|1|A tariff surcharge may be added to this quotation in|Y
01|233108|9|2|the event of a sustained tariff increase on the|Y
01|233108|9|3|importation of this product.  Any surcharge will be|Y
01|233108|9|4|disclosed prior to acceptance of an order.|Y
01|233109|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|233109|6|1|A tariff surcharge may be added to this quotation in|Y
01|233109|6|2|the event of a sustained tariff increase on the|Y
01|233109|6|3|importation of this product.  Any surcharge will be|Y
01|233109|6|4|disclosed prior to acceptance of an order.|Y
01|233110|3|1|A tariff surcharge may be added to this quotation in|Y
01|233110|3|2|the event of a sustained tariff increase on the|Y
01|233110|3|3|importation of this product.  Any surcharge will be|Y
01|233110|3|4|disclosed prior to acceptance of an order.|Y
01|233111|2|1|A tariff surcharge may be added to this quotation in|Y
01|233111|2|2|the event of a sustained tariff increase on the|Y
01|233111|2|3|importation of this product.  Any surcharge will be|Y
01|233111|2|4|disclosed prior to acceptance of an order.|Y
01|233112|5|1|A tariff surcharge may be added to this quotation in|Y
01|233112|5|2|the event of a sustained tariff increase on the|Y
01|233112|5|3|importation of this product.  Any surcharge will be|Y
01|233112|5|4|disclosed prior to acceptance of an order.|Y
01|233113|2|1|NOTE:  Not for Erickson Quick Change.|Y
01|233113|3|1|A tariff surcharge may be added to this quotation in|Y
01|233113|3|2|the event of a sustained tariff increase on the|Y
01|233113|3|3|importation of this product.  Any surcharge will be|Y
01|233113|3|4|disclosed prior to acceptance of an order.|Y
01|233114|2|1|A tariff surcharge may be added to this quotation in|Y
01|233114|2|2|the event of a sustained tariff increase on the|Y
01|233114|2|3|importation of this product.  Any surcharge will be|Y
01|233114|2|4|disclosed prior to acceptance of an order.|Y
01|233115|1|1|NO MOTOR INCLUDED.  MUST TRANSFER FROM OLD TABLE|Y
01|233115|1|2|LEGACY PRODUCT NO LONGER AVAILABLE.  LIMITED STOCK|Y
01|233115|2|1|A tariff surcharge may be added to this quotation in|Y
01|233115|2|2|the event of a sustained tariff increase on the|Y
01|233115|2|3|importation of this product.  Any surcharge will be|Y
01|233115|2|4|disclosed prior to acceptance of an order.|Y
01|233116|1|1|Discount reflects a purchase order of 1~3 holders.|Y
01|233116|2|1|Discount reflects a purchase order of 4~6 holders.|Y
01|233116|3|1|A tariff surcharge may be added to this quotation in|Y
01|233116|3|2|the event of a sustained tariff increase on the|Y
01|233116|3|3|importation of this product.  Any surcharge will be|Y
01|233116|3|4|disclosed prior to acceptance of an order.|Y
01|233117|2|1|A tariff surcharge may be added to this quotation in|Y
01|233117|2|2|the event of a sustained tariff increase on the|Y
01|233117|2|3|importation of this product.  Any surcharge will be|Y
01|233117|2|4|disclosed prior to acceptance of an order.|Y
01|233118|5|1|BMT75-ER40Z|Y
01|233118|5|2|BMT75 Live ER40 Z<Axial>90D  Ext Coolant 7MP 6K CH110|Y
01|233118|6|1|A tariff surcharge may be added to this quotation in|Y
01|233118|6|2|the event of a sustained tariff increase on the|Y
01|233118|6|3|importation of this product.  Any surcharge will be|Y
01|233118|6|4|disclosed prior to acceptance of an order.|Y
01|233119|2|1|A tariff surcharge may be added to this quotation in|Y
01|233119|2|2|the event of a sustained tariff increase on the|Y
01|233119|2|3|importation of this product.  Any surcharge will be|Y
01|233119|2|4|disclosed prior to acceptance of an order.|Y
01|233120|5|1|A tariff surcharge may be added to this quotation in|Y
01|233120|5|2|the event of a sustained tariff increase on the|Y
01|233120|5|3|importation of this product.  Any surcharge will be|Y
01|233120|5|4|disclosed prior to acceptance of an order.|Y
01|233121|6|1|A tariff surcharge may be added to this quotation in|Y
01|233121|6|2|the event of a sustained tariff increase on the|Y
01|233121|6|3|importation of this product.  Any surcharge will be|Y
01|233121|6|4|disclosed prior to acceptance of an order.|Y
01|233122|13|1|A tariff surcharge may be added to this quotation in|Y
01|233122|13|2|the event of a sustained tariff increase on the|Y
01|233122|13|3|importation of this product.  Any surcharge will be|Y
01|233122|13|4|disclosed prior to acceptance of an order.|Y
01|233123|3|1|A tariff surcharge may be added to this quotation in|Y
01|233123|3|2|the event of a sustained tariff increase on the|Y
01|233123|3|3|importation of this product.  Any surcharge will be|Y
01|233123|3|4|disclosed prior to acceptance of an order.|Y
01|233124|3|1|A tariff surcharge may be added to this quotation in|Y
01|233124|3|2|the event of a sustained tariff increase on the|Y
01|233124|3|3|importation of this product.  Any surcharge will be|Y
01|233124|3|4|disclosed prior to acceptance of an order.|Y
01|233125|3|1|A tariff surcharge may be added to this quotation in|Y
01|233125|3|2|the event of a sustained tariff increase on the|Y
01|233125|3|3|importation of this product.  Any surcharge will be|Y
01|233125|3|4|disclosed prior to acceptance of an order.|Y
01|233126|2|1|A tariff surcharge may be added to this quotation in|Y
01|233126|2|2|the event of a sustained tariff increase on the|Y
01|233126|2|3|importation of this product.  Any surcharge will be|Y
01|233126|2|4|disclosed prior to acceptance of an order.|Y
01|233127|3|1|A tariff surcharge may be added to this quotation in|Y
01|233127|3|2|the event of a sustained tariff increase on the|Y
01|233127|3|3|importation of this product.  Any surcharge will be|Y
01|233127|3|4|disclosed prior to acceptance of an order.|Y
01|233128|1|1|FOR HAAS VF2 HFO TO SUPPLY L-N WITH MOTOR CABLE KIT|Y
01|233128|1|2|CUSTOMER PART DRAWING RECOMMENDED TO VERIFY APPLICATION|Y
01|233128|1|3|MOTOR IS INCLUDED.  MAKE SURE YOUR MACHINE IS PREPPED|Y
01|233128|1|4|FOR 4TH AXIS DRIVE AND INTERFACE|Y
01|233128|1|5|NO SURCHARGE FOR STOCK ITEMS|Y
01|233128|3|1|SPECIAL NET -FOR PACKAGE|Y
01|233128|5|1|A tariff surcharge may be added to this quotation in|Y
01|233128|5|2|the event of a sustained tariff increase on the|Y
01|233128|5|3|importation of this product.  Any surcharge will be|Y
01|233128|5|4|disclosed prior to acceptance of an order.|Y
01|233129|5|1|A tariff surcharge may be added to this quotation in|Y
01|233129|5|2|the event of a sustained tariff increase on the|Y
01|233129|5|3|importation of this product.  Any surcharge will be|Y
01|233129|5|4|disclosed prior to acceptance of an order.|Y
01|233130|8|1|A tariff surcharge may be added to this quotation in|Y
01|233130|8|2|the event of a sustained tariff increase on the|Y
01|233130|8|3|importation of this product.  Any surcharge will be|Y
01|233130|8|4|disclosed prior to acceptance of an order.|Y
01|233131|1|1|H80F-SF0750-3.50 w/CP|Y
01|233131|2|1|H80F-SF0625-3.00 w/CP|Y
01|233131|8|1|A tariff surcharge may be added to this quotation in|Y
01|233131|8|2|the event of a sustained tariff increase on the|Y
01|233131|8|3|importation of this product.  Any surcharge will be|Y
01|233131|8|4|disclosed prior to acceptance of an order.|Y
01|233132|1|1|This includes 3x SP-13602 sized jaws.|Y
01|233132|2|1|A tariff surcharge may be added to this quotation in|Y
01|233132|2|2|the event of a sustained tariff increase on the|Y
01|233132|2|3|importation of this product.  Any surcharge will be|Y
01|233132|2|4|disclosed prior to acceptance of an order.|Y
01|233133|7|1|A tariff surcharge may be added to this quotation in|Y
01|233133|7|2|the event of a sustained tariff increase on the|Y
01|233133|7|3|importation of this product.  Any surcharge will be|Y
01|233133|7|4|disclosed prior to acceptance of an order.|Y
01|233134|3|1|A tariff surcharge may be added to this quotation in|Y
01|233134|3|2|the event of a sustained tariff increase on the|Y
01|233134|3|3|importation of this product.  Any surcharge will be|Y
01|233134|3|4|disclosed prior to acceptance of an order.|Y
01|233135|7|1|A tariff surcharge may be added to this quotation in|Y
01|233135|7|2|the event of a sustained tariff increase on the|Y
01|233135|7|3|importation of this product.  Any surcharge will be|Y
01|233135|7|4|disclosed prior to acceptance of an order.|Y
01|233136|2|1|A tariff surcharge may be added to this quotation in|Y
01|233136|2|2|the event of a sustained tariff increase on the|Y
01|233136|2|3|importation of this product.  Any surcharge will be|Y
01|233136|2|4|disclosed prior to acceptance of an order.|Y
01|233137|2|1|A tariff surcharge may be added to this quotation in|Y
01|233137|2|2|the event of a sustained tariff increase on the|Y
01|233137|2|3|importation of this product.  Any surcharge will be|Y
01|233137|2|4|disclosed prior to acceptance of an order.|Y
01|233138|2|1|A tariff surcharge may be added to this quotation in|Y
01|233138|2|2|the event of a sustained tariff increase on the|Y
01|233138|2|3|importation of this product.  Any surcharge will be|Y
01|233138|2|4|disclosed prior to acceptance of an order.|Y
01|233139|2|1|A tariff surcharge may be added to this quotation in|Y
01|233139|2|2|the event of a sustained tariff increase on the|Y
01|233139|2|3|importation of this product.  Any surcharge will be|Y
01|233139|2|4|disclosed prior to acceptance of an order.|Y
01|233140|2|1|A tariff surcharge may be added to this quotation in|Y
01|233140|2|2|the event of a sustained tariff increase on the|Y
01|233140|2|3|importation of this product.  Any surcharge will be|Y
01|233140|2|4|disclosed prior to acceptance of an order.|Y
01|233141|4|1|A tariff surcharge may be added to this quotation in|Y
01|233141|4|2|the event of a sustained tariff increase on the|Y
01|233141|4|3|importation of this product.  Any surcharge will be|Y
01|233141|4|4|disclosed prior to acceptance of an order.|Y
01|233142|3|1|A tariff surcharge may be added to this quotation in|Y
01|233142|3|2|the event of a sustained tariff increase on the|Y
01|233142|3|3|importation of this product.  Any surcharge will be|Y
01|233142|3|4|disclosed prior to acceptance of an order.|Y
01|233143|1|1|P/N: MZQT5-ER40X-OFF|Y
01|233143|1|2|external coolant only|Y
01|233144|15|1|A tariff surcharge may be added to this quotation in|Y
01|233144|15|2|the event of a sustained tariff increase on the|Y
01|233144|15|3|importation of this product.  Any surcharge will be|Y
01|233144|15|4|disclosed prior to acceptance of an order.|Y
01|233145|2|1|A tariff surcharge may be added to this quotation in|Y
01|233145|2|2|the event of a sustained tariff increase on the|Y
01|233145|2|3|importation of this product.  Any surcharge will be|Y
01|233145|2|4|disclosed prior to acceptance of an order.|Y
01|233146|1|1|Quoted at NET price.|Y
01|233146|2|1|A tariff surcharge may be added to this quotation in|Y
01|233146|2|2|the event of a sustained tariff increase on the|Y
01|233146|2|3|importation of this product.  Any surcharge will be|Y
01|233146|2|4|disclosed prior to acceptance of an order.|Y
01|233147|2|1|A tariff surcharge may be added to this quotation in|Y
01|233147|2|2|the event of a sustained tariff increase on the|Y
01|233147|2|3|importation of this product.  Any surcharge will be|Y
01|233147|2|4|disclosed prior to acceptance of an order.|Y
01|233148|2|1|A tariff surcharge may be added to this quotation in|Y
01|233148|2|2|the event of a sustained tariff increase on the|Y
01|233148|2|3|importation of this product.  Any surcharge will be|Y
01|233148|2|4|disclosed prior to acceptance of an order.|Y
01|233149|2|1|A tariff surcharge may be added to this quotation in|Y
01|233149|2|2|the event of a sustained tariff increase on the|Y
01|233149|2|3|importation of this product.  Any surcharge will be|Y
01|233149|2|4|disclosed prior to acceptance of an order.|Y
01|233150|2|1|A tariff surcharge may be added to this quotation in|Y
01|233150|2|2|the event of a sustained tariff increase on the|Y
01|233150|2|3|importation of this product.  Any surcharge will be|Y
01|233150|2|4|disclosed prior to acceptance of an order.|Y
01|233152|14|1|A tariff surcharge may be added to this quotation in|Y
01|233152|14|2|the event of a sustained tariff increase on the|Y
01|233152|14|3|importation of this product.  Any surcharge will be|Y
01|233152|14|4|disclosed prior to acceptance of an order.|Y
01|233153|2|1|A tariff surcharge may be added to this quotation in|Y
01|233153|2|2|the event of a sustained tariff increase on the|Y
01|233153|2|3|importation of this product.  Any surcharge will be|Y
01|233153|2|4|disclosed prior to acceptance of an order.|Y
01|233154|4|1|A tariff surcharge may be added to this quotation in|Y
01|233154|4|2|the event of a sustained tariff increase on the|Y
01|233154|4|3|importation of this product.  Any surcharge will be|Y
01|233154|4|4|disclosed prior to acceptance of an order.|Y
01|233155|6|1|A tariff surcharge may be added to this quotation in|Y
01|233155|6|2|the event of a sustained tariff increase on the|Y
01|233155|6|3|importation of this product.  Any surcharge will be|Y
01|233155|6|4|disclosed prior to acceptance of an order.|Y
01|233156|3|1|A tariff surcharge may be added to this quotation in|Y
01|233156|3|2|the event of a sustained tariff increase on the|Y
01|233156|3|3|importation of this product.  Any surcharge will be|Y
01|233156|3|4|disclosed prior to acceptance of an order.|Y
01|233157|2|1|A tariff surcharge may be added to this quotation in|Y
01|233157|2|2|the event of a sustained tariff increase on the|Y
01|233157|2|3|importation of this product.  Any surcharge will be|Y
01|233157|2|4|disclosed prior to acceptance of an order.|Y
01|233158|16|1|A tariff surcharge may be added to this quotation in|Y
01|233158|16|2|the event of a sustained tariff increase on the|Y
01|233158|16|3|importation of this product.  Any surcharge will be|Y
01|233158|16|4|disclosed prior to acceptance of an order.|Y
01|233159|3|1|A tariff surcharge may be added to this quotation in|Y
01|233159|3|2|the event of a sustained tariff increase on the|Y
01|233159|3|3|importation of this product.  Any surcharge will be|Y
01|233159|3|4|disclosed prior to acceptance of an order.|Y
01|233160|2|1|A tariff surcharge may be added to this quotation in|Y
01|233160|2|2|the event of a sustained tariff increase on the|Y
01|233160|2|3|importation of this product.  Any surcharge will be|Y
01|233160|2|4|disclosed prior to acceptance of an order.|Y
01|233161|6|1|A tariff surcharge may be added to this quotation in|Y
01|233161|6|2|the event of a sustained tariff increase on the|Y
01|233161|6|3|importation of this product.  Any surcharge will be|Y
01|233161|6|4|disclosed prior to acceptance of an order.|Y
01|233162|6|1|A tariff surcharge may be added to this quotation in|Y
01|233162|6|2|the event of a sustained tariff increase on the|Y
01|233162|6|3|importation of this product.  Any surcharge will be|Y
01|233162|6|4|disclosed prior to acceptance of an order.|Y
01|233163|5|1|A tariff surcharge may be added to this quotation in|Y
01|233163|5|2|the event of a sustained tariff increase on the|Y
01|233163|5|3|importation of this product.  Any surcharge will be|Y
01|233163|5|4|disclosed prior to acceptance of an order.|Y
01|233164|7|1|T13158|Y
01|233164|8|1|T00253|Y
01|233164|9|1|F70154|Y
01|233164|10|1|A tariff surcharge may be added to this quotation in|Y
01|233164|10|2|the event of a sustained tariff increase on the|Y
01|233164|10|3|importation of this product.  Any surcharge will be|Y
01|233164|10|4|disclosed prior to acceptance of an order.|Y
01|233165|5|1|A tariff surcharge may be added to this quotation in|Y
01|233165|5|2|the event of a sustained tariff increase on the|Y
01|233165|5|3|importation of this product.  Any surcharge will be|Y
01|233165|5|4|disclosed prior to acceptance of an order.|Y
01|233166|6|1|A tariff surcharge may be added to this quotation in|Y
01|233166|6|2|the event of a sustained tariff increase on the|Y
01|233166|6|3|importation of this product.  Any surcharge will be|Y
01|233166|6|4|disclosed prior to acceptance of an order.|Y
01|233167|2|1|A tariff surcharge may be added to this quotation in|Y
01|233167|2|2|the event of a sustained tariff increase on the|Y
01|233167|2|3|importation of this product.  Any surcharge will be|Y
01|233167|2|4|disclosed prior to acceptance of an order.|Y
01|233168|2|1|A tariff surcharge may be added to this quotation in|Y
01|233168|2|2|the event of a sustained tariff increase on the|Y
01|233168|2|3|importation of this product.  Any surcharge will be|Y
01|233168|2|4|disclosed prior to acceptance of an order.|Y
01|233169|2|1|A tariff surcharge may be added to this quotation in|Y
01|233169|2|2|the event of a sustained tariff increase on the|Y
01|233169|2|3|importation of this product.  Any surcharge will be|Y
01|233169|2|4|disclosed prior to acceptance of an order.|Y
01|233170|2|1|A tariff surcharge may be added to this quotation in|Y
01|233170|2|2|the event of a sustained tariff increase on the|Y
01|233170|2|3|importation of this product.  Any surcharge will be|Y
01|233170|2|4|disclosed prior to acceptance of an order.|Y
01|233171|2|1|A tariff surcharge may be added to this quotation in|Y
01|233171|2|2|the event of a sustained tariff increase on the|Y
01|233171|2|3|importation of this product.  Any surcharge will be|Y
01|233171|2|4|disclosed prior to acceptance of an order.|Y
01|233172|7|1|A tariff surcharge may be added to this quotation in|Y
01|233172|7|2|the event of a sustained tariff increase on the|Y
01|233172|7|3|importation of this product.  Any surcharge will be|Y
01|233172|7|4|disclosed prior to acceptance of an order.|Y
01|233173|7|1|A tariff surcharge may be added to this quotation in|Y
01|233173|7|2|the event of a sustained tariff increase on the|Y
01|233173|7|3|importation of this product.  Any surcharge will be|Y
01|233173|7|4|disclosed prior to acceptance of an order.|Y
01|233174|2|1|A tariff surcharge may be added to this quotation in|Y
01|233174|2|2|the event of a sustained tariff increase on the|Y
01|233174|2|3|importation of this product.  Any surcharge will be|Y
01|233174|2|4|disclosed prior to acceptance of an order.|Y
01|233175|7|1|A tariff surcharge may be added to this quotation in|Y
01|233175|7|2|the event of a sustained tariff increase on the|Y
01|233175|7|3|importation of this product.  Any surcharge will be|Y
01|233175|7|4|disclosed prior to acceptance of an order.|Y
01|233176|5|1|A tariff surcharge may be added to this quotation in|Y
01|233176|5|2|the event of a sustained tariff increase on the|Y
01|233176|5|3|importation of this product.  Any surcharge will be|Y
01|233176|5|4|disclosed prior to acceptance of an order.|Y
01|233177|3|1|A tariff surcharge may be added to this quotation in|Y
01|233177|3|2|the event of a sustained tariff increase on the|Y
01|233177|3|3|importation of this product.  Any surcharge will be|Y
01|233177|3|4|disclosed prior to acceptance of an order.|Y
01|233178|1|1|Metric Range: 7.94~8.33|Y
01|233178|2|1|Metric Range: 11.91~12.3|Y
01|233178|4|1|A tariff surcharge may be added to this quotation in|Y
01|233178|4|2|the event of a sustained tariff increase on the|Y
01|233178|4|3|importation of this product.  Any surcharge will be|Y
01|233178|4|4|disclosed prior to acceptance of an order.|Y
01|233179|6|1|A tariff surcharge may be added to this quotation in|Y
01|233179|6|2|the event of a sustained tariff increase on the|Y
01|233179|6|3|importation of this product.  Any surcharge will be|Y
01|233179|6|4|disclosed prior to acceptance of an order.|Y
01|233180|2|1|A tariff surcharge may be added to this quotation in|Y
01|233180|2|2|the event of a sustained tariff increase on the|Y
01|233180|2|3|importation of this product.  Any surcharge will be|Y
01|233180|2|4|disclosed prior to acceptance of an order.|Y
01|233181|18|1|A tariff surcharge may be added to this quotation in|Y
01|233181|18|2|the event of a sustained tariff increase on the|Y
01|233181|18|3|importation of this product.  Any surcharge will be|Y
01|233181|18|4|disclosed prior to acceptance of an order.|Y
01|233182|9|1|A tariff surcharge may be added to this quotation in|Y
01|233182|9|2|the event of a sustained tariff increase on the|Y
01|233182|9|3|importation of this product.  Any surcharge will be|Y
01|233182|9|4|disclosed prior to acceptance of an order.|Y
01|233183|2|1|A tariff surcharge may be added to this quotation in|Y
01|233183|2|2|the event of a sustained tariff increase on the|Y
01|233183|2|3|importation of this product.  Any surcharge will be|Y
01|233183|2|4|disclosed prior to acceptance of an order.|Y
01|233184|2|1|A tariff surcharge may be added to this quotation in|Y
01|233184|2|2|the event of a sustained tariff increase on the|Y
01|233184|2|3|importation of this product.  Any surcharge will be|Y
01|233184|2|4|disclosed prior to acceptance of an order.|Y
01|233185|2|1|A tariff surcharge may be added to this quotation in|Y
01|233185|2|2|the event of a sustained tariff increase on the|Y
01|233185|2|3|importation of this product.  Any surcharge will be|Y
01|233185|2|4|disclosed prior to acceptance of an order.|Y
01|233186|3|1|A tariff surcharge may be added to this quotation in|Y
01|233186|3|2|the event of a sustained tariff increase on the|Y
01|233186|3|3|importation of this product.  Any surcharge will be|Y
01|233186|3|4|disclosed prior to acceptance of an order.|Y
01|233187|5|1|Soft Face Jaw RV120 (Each) Steel for Square Block.|Y
01|233187|5|2|ORG Parts#: WH-MRV120-JAW-SFTS-F|Y
01|233187|5|3|Special Order Item. Cancellation is not accepted after|Y
01|233187|5|4|the order is confirmed.|Y
01|233187|6|1|Soft Face Jaw RV120 (Each) Steel for Inner Ring|Y
01|233187|6|2|ORG Parts#: WH-MRV120-JAW-SFTS-F|Y
01|233187|6|3|Special Order Item. Cancellation is not accepted after|Y
01|233187|6|4|the order is confirmed.|Y
01|233187|7|1|Soft Face Jaw RV120 (Each) Steel for Outer Ring|Y
01|233187|7|2|ORG Parts#: WH-MRV120-JAW-SFTS-F|Y
01|233187|7|3|Special Order Item. Cancellation is not accepted after|Y
01|233187|7|4|the order is confirmed.|Y
01|233187|13|1|A tariff surcharge may be added to this quotation in|Y
01|233187|13|2|the event of a sustained tariff increase on the|Y
01|233187|13|3|importation of this product.  Any surcharge will be|Y
01|233187|13|4|disclosed prior to acceptance of an order.|Y
01|233188|2|1|A tariff surcharge may be added to this quotation in|Y
01|233188|2|2|the event of a sustained tariff increase on the|Y
01|233188|2|3|importation of this product.  Any surcharge will be|Y
01|233188|2|4|disclosed prior to acceptance of an order.|Y
01|233189|2|1|A tariff surcharge may be added to this quotation in|Y
01|233189|2|2|the event of a sustained tariff increase on the|Y
01|233189|2|3|importation of this product.  Any surcharge will be|Y
01|233189|2|4|disclosed prior to acceptance of an order.|Y
01|233190|4|1|A tariff surcharge may be added to this quotation in|Y
01|233190|4|2|the event of a sustained tariff increase on the|Y
01|233190|4|3|importation of this product.  Any surcharge will be|Y
01|233190|4|4|disclosed prior to acceptance of an order.|Y
01|233191|2|1|A tariff surcharge may be added to this quotation in|Y
01|233191|2|2|the event of a sustained tariff increase on the|Y
01|233191|2|3|importation of this product.  Any surcharge will be|Y
01|233191|2|4|disclosed prior to acceptance of an order.|Y
01|233192|2|1|A tariff surcharge may be added to this quotation in|Y
01|233192|2|2|the event of a sustained tariff increase on the|Y
01|233192|2|3|importation of this product.  Any surcharge will be|Y
01|233192|2|4|disclosed prior to acceptance of an order.|Y
01|233193|2|1|A tariff surcharge may be added to this quotation in|Y
01|233193|2|2|the event of a sustained tariff increase on the|Y
01|233193|2|3|importation of this product.  Any surcharge will be|Y
01|233193|2|4|disclosed prior to acceptance of an order.|Y
01|233194|4|1|A tariff surcharge may be added to this quotation in|Y
01|233194|4|2|the event of a sustained tariff increase on the|Y
01|233194|4|3|importation of this product.  Any surcharge will be|Y
01|233194|4|4|disclosed prior to acceptance of an order.|Y
01|233195|3|1|A tariff surcharge may be added to this quotation in|Y
01|233195|3|2|the event of a sustained tariff increase on the|Y
01|233195|3|3|importation of this product.  Any surcharge will be|Y
01|233195|3|4|disclosed prior to acceptance of an order.|Y
01|233196|2|1|A tariff surcharge may be added to this quotation in|Y
01|233196|2|2|the event of a sustained tariff increase on the|Y
01|233196|2|3|importation of this product.  Any surcharge will be|Y
01|233196|2|4|disclosed prior to acceptance of an order.|Y
01|233197|7|1|A tariff surcharge may be added to this quotation in|Y
01|233197|7|2|the event of a sustained tariff increase on the|Y
01|233197|7|3|importation of this product.  Any surcharge will be|Y
01|233197|7|4|disclosed prior to acceptance of an order.|Y
01|233198|2|1|A tariff surcharge may be added to this quotation in|Y
01|233198|2|2|the event of a sustained tariff increase on the|Y
01|233198|2|3|importation of this product.  Any surcharge will be|Y
01|233198|2|4|disclosed prior to acceptance of an order.|Y
01|233199|1|1|RGA#CUR-61866/|Y
01|233199|1|2|Repair of MRAM-MI40L-IC s/n: 19904297 01|Y
01|233199|1|3|(Mimatic#159995)|Y
01|233199|2|1|Bearings seals and o-rings to be replaced.|Y
01|233199|4|1|RGA#CUR-61866/|Y
01|233199|4|2|Repair of MRAM-EXT-100 s/n:19906335 06 (Mimatic#162758)|Y
01|233199|5|1|Bearings seals and o-rings to be replaced.|Y
01|233199|6|1|A tariff surcharge may be added to this quotation in|Y
01|233199|6|2|the event of a sustained tariff increase on the|Y
01|233199|6|3|importation of this product.  Any surcharge will be|Y
01|233199|6|4|disclosed prior to acceptance of an order.|Y
01|233200|2|1|A tariff surcharge may be added to this quotation in|Y
01|233200|2|2|the event of a sustained tariff increase on the|Y
01|233200|2|3|importation of this product.  Any surcharge will be|Y
01|233200|2|4|disclosed prior to acceptance of an order.|Y
01|233201|2|1|A tariff surcharge may be added to this quotation in|Y
01|233201|2|2|the event of a sustained tariff increase on the|Y
01|233201|2|3|importation of this product.  Any surcharge will be|Y
01|233201|2|4|disclosed prior to acceptance of an order.|Y
01|233202|1|1|RGA#LVR-61891/|Y
01|233202|1|2|Repair of MNZ20-SK20X-ICE-12K s/n:18900785 11|Y
01|233202|1|3|(Mimatic#190667)|Y
01|233202|2|1|Bearings seals o-rings and damaged output spindle to|Y
01|233202|2|2|be repalced.|Y
01|233202|4|1|RGA#LVR-61891/|Y
01|233202|4|2|Repair of MNZ20-SK20X-ICE-12K s/n: 19903898 03|Y
01|233202|4|3|(Mimatic#190667)|Y
01|233202|5|1|Bearings seals o-rings and damaged output spindle to|Y
01|233202|5|2|be replaced.|Y
01|233202|6|1|A tariff surcharge may be added to this quotation in|Y
01|233202|6|2|the event of a sustained tariff increase on the|Y
01|233202|6|3|importation of this product.  Any surcharge will be|Y
01|233202|6|4|disclosed prior to acceptance of an order.|Y
01|233203|2|1|A tariff surcharge may be added to this quotation in|Y
01|233203|2|2|the event of a sustained tariff increase on the|Y
01|233203|2|3|importation of this product.  Any surcharge will be|Y
01|233203|2|4|disclosed prior to acceptance of an order.|Y
01|233204|4|1|A tariff surcharge may be added to this quotation in|Y
01|233204|4|2|the event of a sustained tariff increase on the|Y
01|233204|4|3|importation of this product.  Any surcharge will be|Y
01|233204|4|4|disclosed prior to acceptance of an order.|Y
01|233205|1|1|FOR SHV1000 w/Fanuc 31iM-B control.|Y
01|233205|1|2|Contouring application.|Y
01|233205|3|1|SPECIAL NET -FOR PACKAGE|Y
01|233205|6|1|A tariff surcharge may be added to this quotation in|Y
01|233205|6|2|the event of a sustained tariff increase on the|Y
01|233205|6|3|importation of this product.  Any surcharge will be|Y
01|233205|6|4|disclosed prior to acceptance of an order.|Y
01|233206|2|1|A tariff surcharge may be added to this quotation in|Y
01|233206|2|2|the event of a sustained tariff increase on the|Y
01|233206|2|3|importation of this product.  Any surcharge will be|Y
01|233206|2|4|disclosed prior to acceptance of an order.|Y
01|233207|2|1|A tariff surcharge may be added to this quotation in|Y
01|233207|2|2|the event of a sustained tariff increase on the|Y
01|233207|2|3|importation of this product.  Any surcharge will be|Y
01|233207|2|4|disclosed prior to acceptance of an order.|Y
01|233208|3|1|A tariff surcharge may be added to this quotation in|Y
01|233208|3|2|the event of a sustained tariff increase on the|Y
01|233208|3|3|importation of this product.  Any surcharge will be|Y
01|233208|3|4|disclosed prior to acceptance of an order.|Y
01|233209|3|1|A tariff surcharge may be added to this quotation in|Y
01|233209|3|2|the event of a sustained tariff increase on the|Y
01|233209|3|3|importation of this product.  Any surcharge will be|Y
01|233209|3|4|disclosed prior to acceptance of an order.|Y
01|233210|3|1|A tariff surcharge may be added to this quotation in|Y
01|233210|3|2|the event of a sustained tariff increase on the|Y
01|233210|3|3|importation of this product.  Any surcharge will be|Y
01|233210|3|4|disclosed prior to acceptance of an order.|Y
01|233211|13|1|A tariff surcharge may be added to this quotation in|Y
01|233211|13|2|the event of a sustained tariff increase on the|Y
01|233211|13|3|importation of this product.  Any surcharge will be|Y
01|233211|13|4|disclosed prior to acceptance of an order.|Y
01|233212|7|1|A tariff surcharge may be added to this quotation in|Y
01|233212|7|2|the event of a sustained tariff increase on the|Y
01|233212|7|3|importation of this product.  Any surcharge will be|Y
01|233212|7|4|disclosed prior to acceptance of an order.|Y
01|233213|7|1|A tariff surcharge may be added to this quotation in|Y
01|233213|7|2|the event of a sustained tariff increase on the|Y
01|233213|7|3|importation of this product.  Any surcharge will be|Y
01|233213|7|4|disclosed prior to acceptance of an order.|Y
01|233214|2|1|A tariff surcharge may be added to this quotation in|Y
01|233214|2|2|the event of a sustained tariff increase on the|Y
01|233214|2|3|importation of this product.  Any surcharge will be|Y
01|233214|2|4|disclosed prior to acceptance of an order.|Y
01|233215|3|1|A tariff surcharge may be added to this quotation in|Y
01|233215|3|2|the event of a sustained tariff increase on the|Y
01|233215|3|3|importation of this product.  Any surcharge will be|Y
01|233215|3|4|disclosed prior to acceptance of an order.|Y
01|233216|3|1|A tariff surcharge may be added to this quotation in|Y
01|233216|3|2|the event of a sustained tariff increase on the|Y
01|233216|3|3|importation of this product.  Any surcharge will be|Y
01|233216|3|4|disclosed prior to acceptance of an order.|Y
01|233217|3|1|A tariff surcharge may be added to this quotation in|Y
01|233217|3|2|the event of a sustained tariff increase on the|Y
01|233217|3|3|importation of this product.  Any surcharge will be|Y
01|233217|3|4|disclosed prior to acceptance of an order.|Y
01|233218|8|1|A tariff surcharge may be added to this quotation in|Y
01|233218|8|2|the event of a sustained tariff increase on the|Y
01|233218|8|3|importation of this product.  Any surcharge will be|Y
01|233218|8|4|disclosed prior to acceptance of an order.|Y
01|233219|2|1|ROTARY JOINT FOR THRU SPINDLE HYDRAULICS OR|Y
01|233219|2|2|PNEUMATICS FOR WORKHOLDING SETUP|Y
01|233219|2|3|MAXIMUM PRESSURE CAPABILITY OF ROTARY JOINT IS|Y
01|233219|2|4|1000 PSI|Y
01|233219|3|1|ADAPTER PLATE FOR WORKHOLDING|Y
01|233219|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|233220|2|1|A tariff surcharge may be added to this quotation in|Y
01|233220|2|2|the event of a sustained tariff increase on the|Y
01|233220|2|3|importation of this product.  Any surcharge will be|Y
01|233220|2|4|disclosed prior to acceptance of an order.|Y
01|233221|3|1|A tariff surcharge may be added to this quotation in|Y
01|233221|3|2|the event of a sustained tariff increase on the|Y
01|233221|3|3|importation of this product.  Any surcharge will be|Y
01|233221|3|4|disclosed prior to acceptance of an order.|Y
01|233222|3|1|A tariff surcharge may be added to this quotation in|Y
01|233222|3|2|the event of a sustained tariff increase on the|Y
01|233222|3|3|importation of this product.  Any surcharge will be|Y
01|233222|3|4|disclosed prior to acceptance of an order.|Y
01|233223|3|1|A tariff surcharge may be added to this quotation in|Y
01|233223|3|2|the event of a sustained tariff increase on the|Y
01|233223|3|3|importation of this product.  Any surcharge will be|Y
01|233223|3|4|disclosed prior to acceptance of an order.|Y
01|233224|3|1|A tariff surcharge may be added to this quotation in|Y
01|233224|3|2|the event of a sustained tariff increase on the|Y
01|233224|3|3|importation of this product.  Any surcharge will be|Y
01|233224|3|4|disclosed prior to acceptance of an order.|Y
01|233225|2|1|A tariff surcharge may be added to this quotation in|Y
01|233225|2|2|the event of a sustained tariff increase on the|Y
01|233225|2|3|importation of this product.  Any surcharge will be|Y
01|233225|2|4|disclosed prior to acceptance of an order.|Y
01|233226|2|1|A tariff surcharge may be added to this quotation in|Y
01|233226|2|2|the event of a sustained tariff increase on the|Y
01|233226|2|3|importation of this product.  Any surcharge will be|Y
01|233226|2|4|disclosed prior to acceptance of an order.|Y
01|233227|1|1|E32-275(C) ER32 Collet 7mm Mechanical Coolant Seal|Y
01|233227|1|2|3weeks MFG + Shipping|Y
01|233227|4|1|A tariff surcharge may be added to this quotation in|Y
01|233227|4|2|the event of a sustained tariff increase on the|Y
01|233227|4|3|importation of this product.  Any surcharge will be|Y
01|233227|4|4|disclosed prior to acceptance of an order.|Y
01|233228|4|1|A tariff surcharge may be added to this quotation in|Y
01|233228|4|2|the event of a sustained tariff increase on the|Y
01|233228|4|3|importation of this product.  Any surcharge will be|Y
01|233228|4|4|disclosed prior to acceptance of an order.|Y
01|233229|1|1|RGA#LVR-61939/|Y
01|233229|1|2|Repair of MZMP47-ER32Z-ICE  s/n: 83888 02|Y
01|233229|1|3|(Mimatic#124864)|Y
01|233229|2|1|Bearings seals o-rings and damaged input & output|Y
01|233229|2|2|spindles to be replaced.|Y
01|233229|4|1|RGA#LVR-61939/|Y
01|233229|4|2|Repair of MZMP47-ER32Z-ICE  s/n: 95846 09|Y
01|233229|4|3|(Mimatic#124864)|Y
01|233229|5|1|Bearings seals o-rings and damaged input & output|Y
01|233229|5|2|spindle to be replaced.|Y
01|233229|6|1|A tariff surcharge may be added to this quotation in|Y
01|233229|6|2|the event of a sustained tariff increase on the|Y
01|233229|6|3|importation of this product.  Any surcharge will be|Y
01|233229|6|4|disclosed prior to acceptance of an order.|Y
01|233230|5|1|PRE-PART-12TRE|Y
01|233230|5|2|Includes: 2D Scanner 1000 Data matrix labels Software|Y
01|233230|6|1|Presetter Install/Training|Y
01|233230|7|1|A tariff surcharge may be added to this quotation in|Y
01|233230|7|2|the event of a sustained tariff increase on the|Y
01|233230|7|3|importation of this product.  Any surcharge will be|Y
01|233230|7|4|disclosed prior to acceptance of an order.|Y
01|233231|5|1|A tariff surcharge may be added to this quotation in|Y
01|233231|5|2|the event of a sustained tariff increase on the|Y
01|233231|5|3|importation of this product.  Any surcharge will be|Y
01|233231|5|4|disclosed prior to acceptance of an order.|Y
01|233232|5|1|A tariff surcharge may be added to this quotation in|Y
01|233232|5|2|the event of a sustained tariff increase on the|Y
01|233232|5|3|importation of this product.  Any surcharge will be|Y
01|233232|5|4|disclosed prior to acceptance of an order.|Y
01|233233|9|1|A tariff surcharge may be added to this quotation in|Y
01|233233|9|2|the event of a sustained tariff increase on the|Y
01|233233|9|3|importation of this product.  Any surcharge will be|Y
01|233233|9|4|disclosed prior to acceptance of an order.|Y
01|233234|2|1|A tariff surcharge may be added to this quotation in|Y
01|233234|2|2|the event of a sustained tariff increase on the|Y
01|233234|2|3|importation of this product.  Any surcharge will be|Y
01|233234|2|4|disclosed prior to acceptance of an order.|Y
01|233235|2|1|A tariff surcharge may be added to this quotation in|Y
01|233235|2|2|the event of a sustained tariff increase on the|Y
01|233235|2|3|importation of this product.  Any surcharge will be|Y
01|233235|2|4|disclosed prior to acceptance of an order.|Y
01|233236|2|1|A tariff surcharge may be added to this quotation in|Y
01|233236|2|2|the event of a sustained tariff increase on the|Y
01|233236|2|3|importation of this product.  Any surcharge will be|Y
01|233236|2|4|disclosed prior to acceptance of an order.|Y
01|233237|3|1|A tariff surcharge may be added to this quotation in|Y
01|233237|3|2|the event of a sustained tariff increase on the|Y
01|233237|3|3|importation of this product.  Any surcharge will be|Y
01|233237|3|4|disclosed prior to acceptance of an order.|Y
01|233238|3|1|A tariff surcharge may be added to this quotation in|Y
01|233238|3|2|the event of a sustained tariff increase on the|Y
01|233238|3|3|importation of this product.  Any surcharge will be|Y
01|233238|3|4|disclosed prior to acceptance of an order.|Y
01|233239|2|1|A tariff surcharge may be added to this quotation in|Y
01|233239|2|2|the event of a sustained tariff increase on the|Y
01|233239|2|3|importation of this product.  Any surcharge will be|Y
01|233239|2|4|disclosed prior to acceptance of an order.|Y
01|233240|3|1|A tariff surcharge may be added to this quotation in|Y
01|233240|3|2|the event of a sustained tariff increase on the|Y
01|233240|3|3|importation of this product.  Any surcharge will be|Y
01|233240|3|4|disclosed prior to acceptance of an order.|Y
01|233241|1|1|CAT40-HC20-65|Y
01|233242|2|1|A tariff surcharge may be added to this quotation in|Y
01|233242|2|2|the event of a sustained tariff increase on the|Y
01|233242|2|3|importation of this product.  Any surcharge will be|Y
01|233242|2|4|disclosed prior to acceptance of an order.|Y
01|233243|2|1|EXTERNAL POWER/FEEDACK CABLES FOR 4TH/5TH FOR|Y
01|233243|2|2|OKUMA M560 VMC|Y
01|233243|3|1|A tariff surcharge may be added to this quotation in|Y
01|233243|3|2|the event of a sustained tariff increase on the|Y
01|233243|3|3|importation of this product.  Any surcharge will be|Y
01|233243|3|4|disclosed prior to acceptance of an order.|Y
01|233244|2|1|AY0200 AIR/HYDRAULIC BOOSTER INCLUDED WITH TABLE|Y
01|233244|2|2|MACHINE INTERFACE WILL BE AIR|Y
01|233244|4|1|A tariff surcharge may be added to this quotation in|Y
01|233244|4|2|the event of a sustained tariff increase on the|Y
01|233244|4|3|importation of this product.  Any surcharge will be|Y
01|233244|4|4|disclosed prior to acceptance of an order.|Y
01|233245|5|1|A tariff surcharge may be added to this quotation in|Y
01|233245|5|2|the event of a sustained tariff increase on the|Y
01|233245|5|3|importation of this product.  Any surcharge will be|Y
01|233245|5|4|disclosed prior to acceptance of an order.|Y
01|233246|1|1|N/A Taper plus|Y
01|233246|12|1|n/a|Y
01|233247|2|1|A tariff surcharge may be added to this quotation in|Y
01|233247|2|2|the event of a sustained tariff increase on the|Y
01|233247|2|3|importation of this product.  Any surcharge will be|Y
01|233247|2|4|disclosed prior to acceptance of an order.|Y
01|233248|4|1|A tariff surcharge may be added to this quotation in|Y
01|233248|4|2|the event of a sustained tariff increase on the|Y
01|233248|4|3|importation of this product.  Any surcharge will be|Y
01|233248|4|4|disclosed prior to acceptance of an order.|Y
01|233249|2|1|A tariff surcharge may be added to this quotation in|Y
01|233249|2|2|the event of a sustained tariff increase on the|Y
01|233249|2|3|importation of this product.  Any surcharge will be|Y
01|233249|2|4|disclosed prior to acceptance of an order.|Y
01|233250|2|1|A tariff surcharge may be added to this quotation in|Y
01|233250|2|2|the event of a sustained tariff increase on the|Y
01|233250|2|3|importation of this product.  Any surcharge will be|Y
01|233250|2|4|disclosed prior to acceptance of an order.|Y
01|233251|9|1|A tariff surcharge may be added to this quotation in|Y
01|233251|9|2|the event of a sustained tariff increase on the|Y
01|233251|9|3|importation of this product.  Any surcharge will be|Y
01|233251|9|4|disclosed prior to acceptance of an order.|Y
01|233252|6|1|A tariff surcharge may be added to this quotation in|Y
01|233252|6|2|the event of a sustained tariff increase on the|Y
01|233252|6|3|importation of this product.  Any surcharge will be|Y
01|233252|6|4|disclosed prior to acceptance of an order.|Y
01|233253|2|1|A tariff surcharge may be added to this quotation in|Y
01|233253|2|2|the event of a sustained tariff increase on the|Y
01|233253|2|3|importation of this product.  Any surcharge will be|Y
01|233253|2|4|disclosed prior to acceptance of an order.|Y
01|233254|4|1|A tariff surcharge may be added to this quotation in|Y
01|233254|4|2|the event of a sustained tariff increase on the|Y
01|233254|4|3|importation of this product.  Any surcharge will be|Y
01|233254|4|4|disclosed prior to acceptance of an order.|Y
01|233255|2|1|A tariff surcharge may be added to this quotation in|Y
01|233255|2|2|the event of a sustained tariff increase on the|Y
01|233255|2|3|importation of this product.  Any surcharge will be|Y
01|233255|2|4|disclosed prior to acceptance of an order.|Y
01|233256|2|1|A tariff surcharge may be added to this quotation in|Y
01|233256|2|2|the event of a sustained tariff increase on the|Y
01|233256|2|3|importation of this product.  Any surcharge will be|Y
01|233256|2|4|disclosed prior to acceptance of an order.|Y
01|233257|3|1|A tariff surcharge may be added to this quotation in|Y
01|233257|3|2|the event of a sustained tariff increase on the|Y
01|233257|3|3|importation of this product.  Any surcharge will be|Y
01|233257|3|4|disclosed prior to acceptance of an order.|Y
01|233258|2|1|Please note additional 20% applied per overstock promo.|Y
01|233258|2|2|These items cannot be cancelled or returned upon|Y
01|233258|2|3|receipt of PO/order. Once stock is depleted these will|Y
01|233258|2|4|need to be requoted.|Y
01|233258|4|1|A tariff surcharge may be added to this quotation in|Y
01|233258|4|2|the event of a sustained tariff increase on the|Y
01|233258|4|3|importation of this product.  Any surcharge will be|Y
01|233258|4|4|disclosed prior to acceptance of an order.|Y
01|233259|2|1|A tariff surcharge may be added to this quotation in|Y
01|233259|2|2|the event of a sustained tariff increase on the|Y
01|233259|2|3|importation of this product.  Any surcharge will be|Y
01|233259|2|4|disclosed prior to acceptance of an order.|Y
01|233260|4|1|A tariff surcharge may be added to this quotation in|Y
01|233260|4|2|the event of a sustained tariff increase on the|Y
01|233260|4|3|importation of this product.  Any surcharge will be|Y
01|233260|4|4|disclosed prior to acceptance of an order.|Y
01|233261|1|1|Please confirm shank and square with the customer|Y
01|233261|1|2|before placing an order.|Y
01|233261|2|1|A tariff surcharge may be added to this quotation in|Y
01|233261|2|2|the event of a sustained tariff increase on the|Y
01|233261|2|3|importation of this product.  Any surcharge will be|Y
01|233261|2|4|disclosed prior to acceptance of an order.|Y
01|233262|2|1|A tariff surcharge may be added to this quotation in|Y
01|233262|2|2|the event of a sustained tariff increase on the|Y
01|233262|2|3|importation of this product.  Any surcharge will be|Y
01|233262|2|4|disclosed prior to acceptance of an order.|Y
01|233263|2|1|A tariff surcharge may be added to this quotation in|Y
01|233263|2|2|the event of a sustained tariff increase on the|Y
01|233263|2|3|importation of this product.  Any surcharge will be|Y
01|233263|2|4|disclosed prior to acceptance of an order.|Y
01|233264|2|1|A tariff surcharge may be added to this quotation in|Y
01|233264|2|2|the event of a sustained tariff increase on the|Y
01|233264|2|3|importation of this product.  Any surcharge will be|Y
01|233264|2|4|disclosed prior to acceptance of an order.|Y
01|233265|4|1|A tariff surcharge may be added to this quotation in|Y
01|233265|4|2|the event of a sustained tariff increase on the|Y
01|233265|4|3|importation of this product.  Any surcharge will be|Y
01|233265|4|4|disclosed prior to acceptance of an order.|Y
01|233266|2|1|A tariff surcharge may be added to this quotation in|Y
01|233266|2|2|the event of a sustained tariff increase on the|Y
01|233266|2|3|importation of this product.  Any surcharge will be|Y
01|233266|2|4|disclosed prior to acceptance of an order.|Y
01|233267|2|1|A tariff surcharge may be added to this quotation in|Y
01|233267|2|2|the event of a sustained tariff increase on the|Y
01|233267|2|3|importation of this product.  Any surcharge will be|Y
01|233267|2|4|disclosed prior to acceptance of an order.|Y
01|233268|11|1|A tariff surcharge may be added to this quotation in|Y
01|233268|11|2|the event of a sustained tariff increase on the|Y
01|233268|11|3|importation of this product.  Any surcharge will be|Y
01|233268|11|4|disclosed prior to acceptance of an order.|Y
01|233269|3|1|POSITIONING BLOCK DOOSAN DNM750/50II|Y
01|233269|4|1|A tariff surcharge may be added to this quotation in|Y
01|233269|4|2|the event of a sustained tariff increase on the|Y
01|233269|4|3|importation of this product.  Any surcharge will be|Y
01|233269|4|4|disclosed prior to acceptance of an order.|Y
01|233270|1|1|Checkup x3 5AX-2MT-130-170BAHFA-M|Y
01|233270|3|1|Travel expenses|Y
01|233270|4|1|A tariff surcharge may be added to this quotation in|Y
01|233270|4|2|the event of a sustained tariff increase on the|Y
01|233270|4|3|importation of this product.  Any surcharge will be|Y
01|233270|4|4|disclosed prior to acceptance of an order.|Y
01|233271|5|1|A tariff surcharge may be added to this quotation in|Y
01|233271|5|2|the event of a sustained tariff increase on the|Y
01|233271|5|3|importation of this product.  Any surcharge will be|Y
01|233271|5|4|disclosed prior to acceptance of an order.|Y
01|233272|1|1|Placeholder for HSK50A hydraulic chuck 25mm ID/100mm GL|Y
01|233272|1|2|- please allow 12 weeks manufacturing time after signed|Y
01|233272|1|3|approval drawing received. Minimum order quantity of 3.|Y
01|233272|3|1|Placeholder for HSK50A hydraulic chuck 25mm ID/120mm GL|Y
01|233272|5|1|Placeholder for HSK50A hydraulic chuck 25mm ID/95mm GL|Y
01|233272|11|1|A tariff surcharge may be added to this quotation in|Y
01|233272|11|2|the event of a sustained tariff increase on the|Y
01|233272|11|3|importation of this product.  Any surcharge will be|Y
01|233272|11|4|disclosed prior to acceptance of an order.|Y
01|233273|4|1|PLEASE NOTE:  PRICING IS ONLY FOR TOOL CERTIFICATE|Y
01|233273|4|2|NUMBER 4896 FOR ROSS MACHINE.|Y
01|233273|5|1|A tariff surcharge may be added to this quotation in|Y
01|233273|5|2|the event of a sustained tariff increase on the|Y
01|233273|5|3|importation of this product.  Any surcharge will be|Y
01|233273|5|4|disclosed prior to acceptance of an order.|Y
01|233274|28|1|A tariff surcharge may be added to this quotation in|Y
01|233274|28|2|the event of a sustained tariff increase on the|Y
01|233274|28|3|importation of this product.  Any surcharge will be|Y
01|233274|28|4|disclosed prior to acceptance of an order.|Y
01|233275|13|1|A tariff surcharge may be added to this quotation in|Y
01|233275|13|2|the event of a sustained tariff increase on the|Y
01|233275|13|3|importation of this product.  Any surcharge will be|Y
01|233275|13|4|disclosed prior to acceptance of an order.|Y
01|233276|1|1|RGA#CUR-61601/|Y
01|233276|1|2|Repair of NC50RAM-SM12-215C-110TP3P s/n: 19901626 01|Y
01|233276|1|3|(Mimatic#190468)|Y
01|233276|2|1|Bearings seals and o-rings to be replaced|Y
01|233276|3|1|A tariff surcharge may be added to this quotation in|Y
01|233276|3|2|the event of a sustained tariff increase on the|Y
01|233276|3|3|importation of this product.  Any surcharge will be|Y
01|233276|3|4|disclosed prior to acceptance of an order.|Y
01|233277|28|1|A tariff surcharge may be added to this quotation in|Y
01|233277|28|2|the event of a sustained tariff increase on the|Y
01|233277|28|3|importation of this product.  Any surcharge will be|Y
01|233277|28|4|disclosed prior to acceptance of an order.|Y
01|233278|2|1|A tariff surcharge may be added to this quotation in|Y
01|233278|2|2|the event of a sustained tariff increase on the|Y
01|233278|2|3|importation of this product.  Any surcharge will be|Y
01|233278|2|4|disclosed prior to acceptance of an order.|Y
01|233279|5|1|A tariff surcharge may be added to this quotation in|Y
01|233279|5|2|the event of a sustained tariff increase on the|Y
01|233279|5|3|importation of this product.  Any surcharge will be|Y
01|233279|5|4|disclosed prior to acceptance of an order.|Y
01|233280|3|1|A tariff surcharge may be added to this quotation in|Y
01|233280|3|2|the event of a sustained tariff increase on the|Y
01|233280|3|3|importation of this product.  Any surcharge will be|Y
01|233280|3|4|disclosed prior to acceptance of an order.|Y
01|233281|4|1|A tariff surcharge may be added to this quotation in|Y
01|233281|4|2|the event of a sustained tariff increase on the|Y
01|233281|4|3|importation of this product.  Any surcharge will be|Y
01|233281|4|4|disclosed prior to acceptance of an order.|Y
01|233282|3|1|KM3/4-15/64  Straight Collet/Sleeve OD3/4 ID 15/64|Y
01|233282|4|1|KM3/4-9/32 Straight Collet/Sleeve OD 3/4 ID 9/32|Y
01|233282|11|1|A tariff surcharge may be added to this quotation in|Y
01|233282|11|2|the event of a sustained tariff increase on the|Y
01|233282|11|3|importation of this product.  Any surcharge will be|Y
01|233282|11|4|disclosed prior to acceptance of an order.|Y
01|233283|1|1|GW:3.6kg Box Dim:L26xW21xH21(cm)|Y
01|233283|2|1|A tariff surcharge may be added to this quotation in|Y
01|233283|2|2|the event of a sustained tariff increase on the|Y
01|233283|2|3|importation of this product.  Any surcharge will be|Y
01|233283|2|4|disclosed prior to acceptance of an order.|Y
01|233284|3|1|A tariff surcharge may be added to this quotation in|Y
01|233284|3|2|the event of a sustained tariff increase on the|Y
01|233284|3|3|importation of this product.  Any surcharge will be|Y
01|233284|3|4|disclosed prior to acceptance of an order.|Y
01|233285|2|1|A tariff surcharge may be added to this quotation in|Y
01|233285|2|2|the event of a sustained tariff increase on the|Y
01|233285|2|3|importation of this product.  Any surcharge will be|Y
01|233285|2|4|disclosed prior to acceptance of an order.|Y
01|233286|2|1|A tariff surcharge may be added to this quotation in|Y
01|233286|2|2|the event of a sustained tariff increase on the|Y
01|233286|2|3|importation of this product.  Any surcharge will be|Y
01|233286|2|4|disclosed prior to acceptance of an order.|Y
01|233287|1|1|Lead time is approximately 3~4 Weeks after receipt of|Y
01|233287|1|2|an order.|Y
01|233287|2|1|A tariff surcharge may be added to this quotation in|Y
01|233287|2|2|the event of a sustained tariff increase on the|Y
01|233287|2|3|importation of this product.  Any surcharge will be|Y
01|233287|2|4|disclosed prior to acceptance of an order.|Y
01|233288|4|1|3-Jaw(2Pc) SET-TRUT Forged Steel 16in|Y
01|233288|4|2|3-Jaw Super Precision SET-TRUT Forged Steel Body|Y
01|233288|4|3|Scroll Chuck with Two-Piece Hard Reversible Jaws|Y
01|233288|4|4|Including adapter plate|Y
01|233288|4|5|1|N
01|233288|5|1|A tariff surcharge may be added to this quotation in|Y
01|233288|5|2|the event of a sustained tariff increase on the|Y
01|233288|5|3|importation of this product.  Any surcharge will be|Y
01|233288|5|4|disclosed prior to acceptance of an order.|Y
01|233289|4|1|A tariff surcharge may be added to this quotation in|Y
01|233289|4|2|the event of a sustained tariff increase on the|Y
01|233289|4|3|importation of this product.  Any surcharge will be|Y
01|233289|4|4|disclosed prior to acceptance of an order.|Y
01|233290|4|1|A tariff surcharge may be added to this quotation in|Y
01|233290|4|2|the event of a sustained tariff increase on the|Y
01|233290|4|3|importation of this product.  Any surcharge will be|Y
01|233290|4|4|disclosed prior to acceptance of an order.|Y
01|233291|2|1|A tariff surcharge may be added to this quotation in|Y
01|233291|2|2|the event of a sustained tariff increase on the|Y
01|233291|2|3|importation of this product.  Any surcharge will be|Y
01|233291|2|4|disclosed prior to acceptance of an order.|Y
01|233292|1|1|H80F-SF1000-3.50|Y
01|233292|2|1|H80F-SF0750-3.50|Y
01|233292|3|1|H80F-SF0625-3.00|Y
01|233292|4|1|H80F-SF0500-3.50|Y
01|233292|5|1|H80F-SF0375-3.50|Y
01|233292|6|1|H80F-SF0250-3.50|Y
01|233292|7|1|H80F-SF0312-3.50|Y
01|233292|8|1|HSK80F-ER32-3.00|Y
01|233292|10|1|A tariff surcharge may be added to this quotation in|Y
01|233292|10|2|the event of a sustained tariff increase on the|Y
01|233292|10|3|importation of this product.  Any surcharge will be|Y
01|233292|10|4|disclosed prior to acceptance of an order.|Y
01|233293|5|1|A tariff surcharge may be added to this quotation in|Y
01|233293|5|2|the event of a sustained tariff increase on the|Y
01|233293|5|3|importation of this product.  Any surcharge will be|Y
01|233293|5|4|disclosed prior to acceptance of an order.|Y
01|233294|3|1|Special one time pricing|Y
01|233294|4|1|Special one time pricing|Y
01|233294|5|1|Special one time pricing|Y
01|233294|6|1|A tariff surcharge may be added to this quotation in|Y
01|233294|6|2|the event of a sustained tariff increase on the|Y
01|233294|6|3|importation of this product.  Any surcharge will be|Y
01|233294|6|4|disclosed prior to acceptance of an order.|Y
01|233296|3|1|A tariff surcharge may be added to this quotation in|Y
01|233296|3|2|the event of a sustained tariff increase on the|Y
01|233296|3|3|importation of this product.  Any surcharge will be|Y
01|233296|3|4|disclosed prior to acceptance of an order.|Y
01|233297|2|1|A tariff surcharge may be added to this quotation in|Y
01|233297|2|2|the event of a sustained tariff increase on the|Y
01|233297|2|3|importation of this product.  Any surcharge will be|Y
01|233297|2|4|disclosed prior to acceptance of an order.|Y
01|233298|2|1|A tariff surcharge may be added to this quotation in|Y
01|233298|2|2|the event of a sustained tariff increase on the|Y
01|233298|2|3|importation of this product.  Any surcharge will be|Y
01|233298|2|4|disclosed prior to acceptance of an order.|Y
01|233299|1|1|No INS Req'd.|Y
01|233299|2|1|A tariff surcharge may be added to this quotation in|Y
01|233299|2|2|the event of a sustained tariff increase on the|Y
01|233299|2|3|importation of this product.  Any surcharge will be|Y
01|233299|2|4|disclosed prior to acceptance of an order.|Y
01|233300|2|1|A tariff surcharge may be added to this quotation in|Y
01|233300|2|2|the event of a sustained tariff increase on the|Y
01|233300|2|3|importation of this product.  Any surcharge will be|Y
01|233300|2|4|disclosed prior to acceptance of an order.|Y
01|233301|2|1|A tariff surcharge may be added to this quotation in|Y
01|233301|2|2|the event of a sustained tariff increase on the|Y
01|233301|2|3|importation of this product.  Any surcharge will be|Y
01|233301|2|4|disclosed prior to acceptance of an order.|Y
01|233302|2|1|A tariff surcharge may be added to this quotation in|Y
01|233302|2|2|the event of a sustained tariff increase on the|Y
01|233302|2|3|importation of this product.  Any surcharge will be|Y
01|233302|2|4|disclosed prior to acceptance of an order.|Y
01|233303|5|1|A tariff surcharge may be added to this quotation in|Y
01|233303|5|2|the event of a sustained tariff increase on the|Y
01|233303|5|3|importation of this product.  Any surcharge will be|Y
01|233303|5|4|disclosed prior to acceptance of an order.|Y
01|233304|8|1|A tariff surcharge may be added to this quotation in|Y
01|233304|8|2|the event of a sustained tariff increase on the|Y
01|233304|8|3|importation of this product.  Any surcharge will be|Y
01|233304|8|4|disclosed prior to acceptance of an order.|Y
01|233305|2|1|A tariff surcharge may be added to this quotation in|Y
01|233305|2|2|the event of a sustained tariff increase on the|Y
01|233305|2|3|importation of this product.  Any surcharge will be|Y
01|233305|2|4|disclosed prior to acceptance of an order.|Y
01|233306|2|1|A tariff surcharge may be added to this quotation in|Y
01|233306|2|2|the event of a sustained tariff increase on the|Y
01|233306|2|3|importation of this product.  Any surcharge will be|Y
01|233306|2|4|disclosed prior to acceptance of an order.|Y
01|233307|6|1|A tariff surcharge may be added to this quotation in|Y
01|233307|6|2|the event of a sustained tariff increase on the|Y
01|233307|6|3|importation of this product.  Any surcharge will be|Y
01|233307|6|4|disclosed prior to acceptance of an order.|Y
01|233308|11|1|A tariff surcharge may be added to this quotation in|Y
01|233308|11|2|the event of a sustained tariff increase on the|Y
01|233308|11|3|importation of this product.  Any surcharge will be|Y
01|233308|11|4|disclosed prior to acceptance of an order.|Y
01|233309|5|1|A tariff surcharge may be added to this quotation in|Y
01|233309|5|2|the event of a sustained tariff increase on the|Y
01|233309|5|3|importation of this product.  Any surcharge will be|Y
01|233309|5|4|disclosed prior to acceptance of an order.|Y
01|233310|2|1|A tariff surcharge may be added to this quotation in|Y
01|233310|2|2|the event of a sustained tariff increase on the|Y
01|233310|2|3|importation of this product.  Any surcharge will be|Y
01|233310|2|4|disclosed prior to acceptance of an order.|Y
01|233311|14|1|A tariff surcharge may be added to this quotation in|Y
01|233311|14|2|the event of a sustained tariff increase on the|Y
01|233311|14|3|importation of this product.  Any surcharge will be|Y
01|233311|14|4|disclosed prior to acceptance of an order.|Y
01|233312|2|1|A tariff surcharge may be added to this quotation in|Y
01|233312|2|2|the event of a sustained tariff increase on the|Y
01|233312|2|3|importation of this product.  Any surcharge will be|Y
01|233312|2|4|disclosed prior to acceptance of an order.|Y
01|233313|2|1|A tariff surcharge may be added to this quotation in|Y
01|233313|2|2|the event of a sustained tariff increase on the|Y
01|233313|2|3|importation of this product.  Any surcharge will be|Y
01|233313|2|4|disclosed prior to acceptance of an order.|Y
01|233314|2|1|A tariff surcharge may be added to this quotation in|Y
01|233314|2|2|the event of a sustained tariff increase on the|Y
01|233314|2|3|importation of this product.  Any surcharge will be|Y
01|233314|2|4|disclosed prior to acceptance of an order.|Y
01|233315|2|1|A tariff surcharge may be added to this quotation in|Y
01|233315|2|2|the event of a sustained tariff increase on the|Y
01|233315|2|3|importation of this product.  Any surcharge will be|Y
01|233315|2|4|disclosed prior to acceptance of an order.|Y
01|233316|2|1|A tariff surcharge may be added to this quotation in|Y
01|233316|2|2|the event of a sustained tariff increase on the|Y
01|233316|2|3|importation of this product.  Any surcharge will be|Y
01|233316|2|4|disclosed prior to acceptance of an order.|Y
01|233317|2|1|Non-returnable/Non-cancellable. Quoted at NET pricing.|Y
01|233317|3|1|Non-returnable/Non-cancellable. Quoted at NET pricing|Y
01|233317|8|1|A tariff surcharge may be added to this quotation in|Y
01|233317|8|2|the event of a sustained tariff increase on the|Y
01|233317|8|3|importation of this product.  Any surcharge will be|Y
01|233317|8|4|disclosed prior to acceptance of an order.|Y
01|233318|3|1|A tariff surcharge may be added to this quotation in|Y
01|233318|3|2|the event of a sustained tariff increase on the|Y
01|233318|3|3|importation of this product.  Any surcharge will be|Y
01|233318|3|4|disclosed prior to acceptance of an order.|Y
01|233319|2|1|A tariff surcharge may be added to this quotation in|Y
01|233319|2|2|the event of a sustained tariff increase on the|Y
01|233319|2|3|importation of this product.  Any surcharge will be|Y
01|233319|2|4|disclosed prior to acceptance of an order.|Y
01|233320|2|1|A tariff surcharge may be added to this quotation in|Y
01|233320|2|2|the event of a sustained tariff increase on the|Y
01|233320|2|3|importation of this product.  Any surcharge will be|Y
01|233320|2|4|disclosed prior to acceptance of an order.|Y
01|233321|1|1|Please note: This is special non-standard stock.|Y
01|233321|1|2|Cannot be cancelled or returned upon receipt of PO.|Y
01|233321|4|1|A tariff surcharge may be added to this quotation in|Y
01|233321|4|2|the event of a sustained tariff increase on the|Y
01|233321|4|3|importation of this product.  Any surcharge will be|Y
01|233321|4|4|disclosed prior to acceptance of an order.|Y
01|233322|4|1|A tariff surcharge may be added to this quotation in|Y
01|233322|4|2|the event of a sustained tariff increase on the|Y
01|233322|4|3|importation of this product.  Any surcharge will be|Y
01|233322|4|4|disclosed prior to acceptance of an order.|Y
01|233323|3|1|A tariff surcharge may be added to this quotation in|Y
01|233323|3|2|the event of a sustained tariff increase on the|Y
01|233323|3|3|importation of this product.  Any surcharge will be|Y
01|233323|3|4|disclosed prior to acceptance of an order.|Y
01|233324|2|1|A tariff surcharge may be added to this quotation in|Y
01|233324|2|2|the event of a sustained tariff increase on the|Y
01|233324|2|3|importation of this product.  Any surcharge will be|Y
01|233324|2|4|disclosed prior to acceptance of an order.|Y
01|233325|2|1|A tariff surcharge may be added to this quotation in|Y
01|233325|2|2|the event of a sustained tariff increase on the|Y
01|233325|2|3|importation of this product.  Any surcharge will be|Y
01|233325|2|4|disclosed prior to acceptance of an order.|Y
01|233326|10|1|A tariff surcharge may be added to this quotation in|Y
01|233326|10|2|the event of a sustained tariff increase on the|Y
01|233326|10|3|importation of this product.  Any surcharge will be|Y
01|233326|10|4|disclosed prior to acceptance of an order.|Y
01|233327|31|1|A tariff surcharge may be added to this quotation in|Y
01|233327|31|2|the event of a sustained tariff increase on the|Y
01|233327|31|3|importation of this product.  Any surcharge will be|Y
01|233327|31|4|disclosed prior to acceptance of an order.|Y
01|233328|2|1|A tariff surcharge may be added to this quotation in|Y
01|233328|2|2|the event of a sustained tariff increase on the|Y
01|233328|2|3|importation of this product.  Any surcharge will be|Y
01|233328|2|4|disclosed prior to acceptance of an order.|Y
01|233329|2|1|A tariff surcharge may be added to this quotation in|Y
01|233329|2|2|the event of a sustained tariff increase on the|Y
01|233329|2|3|importation of this product.  Any surcharge will be|Y
01|233329|2|4|disclosed prior to acceptance of an order.|Y
01|233330|3|1|A tariff surcharge may be added to this quotation in|Y
01|233330|3|2|the event of a sustained tariff increase on the|Y
01|233330|3|3|importation of this product.  Any surcharge will be|Y
01|233330|3|4|disclosed prior to acceptance of an order.|Y
01|233331|21|1|A tariff surcharge may be added to this quotation in|Y
01|233331|21|2|the event of a sustained tariff increase on the|Y
01|233331|21|3|importation of this product.  Any surcharge will be|Y
01|233331|21|4|disclosed prior to acceptance of an order.|Y
01|233332|5|1|A tariff surcharge may be added to this quotation in|Y
01|233332|5|2|the event of a sustained tariff increase on the|Y
01|233332|5|3|importation of this product.  Any surcharge will be|Y
01|233332|5|4|disclosed prior to acceptance of an order.|Y
01|233333|12|1|A tariff surcharge may be added to this quotation in|Y
01|233333|12|2|the event of a sustained tariff increase on the|Y
01|233333|12|3|importation of this product.  Any surcharge will be|Y
01|233333|12|4|disclosed prior to acceptance of an order.|Y
01|233334|3|1|A tariff surcharge may be added to this quotation in|Y
01|233334|3|2|the event of a sustained tariff increase on the|Y
01|233334|3|3|importation of this product.  Any surcharge will be|Y
01|233334|3|4|disclosed prior to acceptance of an order.|Y
01|233335|3|1|A tariff surcharge may be added to this quotation in|Y
01|233335|3|2|the event of a sustained tariff increase on the|Y
01|233335|3|3|importation of this product.  Any surcharge will be|Y
01|233335|3|4|disclosed prior to acceptance of an order.|Y
01|233336|3|1|A tariff surcharge may be added to this quotation in|Y
01|233336|3|2|the event of a sustained tariff increase on the|Y
01|233336|3|3|importation of this product.  Any surcharge will be|Y
01|233336|3|4|disclosed prior to acceptance of an order.|Y
01|233337|10|1|A tariff surcharge may be added to this quotation in|Y
01|233337|10|2|the event of a sustained tariff increase on the|Y
01|233337|10|3|importation of this product.  Any surcharge will be|Y
01|233337|10|4|disclosed prior to acceptance of an order.|Y
01|233338|7|1|A tariff surcharge may be added to this quotation in|Y
01|233338|7|2|the event of a sustained tariff increase on the|Y
01|233338|7|3|importation of this product.  Any surcharge will be|Y
01|233338|7|4|disclosed prior to acceptance of an order.|Y
01|233338|9|1|Please Note: C40RAM-ER25-180TS-65TP is non-standard|Y
01|233338|9|2|stock. Once a purchase order is placed it cannot be|Y
01|233338|9|3|cancelled or returned.|Y
01|233339|5|1|A tariff surcharge may be added to this quotation in|Y
01|233339|5|2|the event of a sustained tariff increase on the|Y
01|233339|5|3|importation of this product.  Any surcharge will be|Y
01|233339|5|4|disclosed prior to acceptance of an order.|Y
01|233340|2|1|CUSTOM POSITIONING BLOCK FOR DOOSAN DNM750/50|Y
01|233340|3|1|A tariff surcharge may be added to this quotation in|Y
01|233340|3|2|the event of a sustained tariff increase on the|Y
01|233340|3|3|importation of this product.  Any surcharge will be|Y
01|233340|3|4|disclosed prior to acceptance of an order.|Y
01|233341|7|1|A tariff surcharge may be added to this quotation in|Y
01|233341|7|2|the event of a sustained tariff increase on the|Y
01|233341|7|3|importation of this product.  Any surcharge will be|Y
01|233341|7|4|disclosed prior to acceptance of an order.|Y
01|233342|1|1|Currently nine (9) in stock.  Balance of one (1)|Y
01|233342|1|2|estimated lead time is mid/end July.|Y
01|233342|2|1|A tariff surcharge may be added to this quotation in|Y
01|233342|2|2|the event of a sustained tariff increase on the|Y
01|233342|2|3|importation of this product.  Any surcharge will be|Y
01|233342|2|4|disclosed prior to acceptance of an order.|Y
01|233343|5|1|A tariff surcharge may be added to this quotation in|Y
01|233343|5|2|the event of a sustained tariff increase on the|Y
01|233343|5|3|importation of this product.  Any surcharge will be|Y
01|233343|5|4|disclosed prior to acceptance of an order.|Y
01|233344|3|1|A tariff surcharge may be added to this quotation in|Y
01|233344|3|2|the event of a sustained tariff increase on the|Y
01|233344|3|3|importation of this product.  Any surcharge will be|Y
01|233344|3|4|disclosed prior to acceptance of an order.|Y
01|233345|5|1|A tariff surcharge may be added to this quotation in|Y
01|233345|5|2|the event of a sustained tariff increase on the|Y
01|233345|5|3|importation of this product.  Any surcharge will be|Y
01|233345|5|4|disclosed prior to acceptance of an order.|Y
01|233346|4|1|A tariff surcharge may be added to this quotation in|Y
01|233346|4|2|the event of a sustained tariff increase on the|Y
01|233346|4|3|importation of this product.  Any surcharge will be|Y
01|233346|4|4|disclosed prior to acceptance of an order.|Y
01|233347|7|1|A tariff surcharge may be added to this quotation in|Y
01|233347|7|2|the event of a sustained tariff increase on the|Y
01|233347|7|3|importation of this product.  Any surcharge will be|Y
01|233347|7|4|disclosed prior to acceptance of an order.|Y
01|233348|2|1|A tariff surcharge may be added to this quotation in|Y
01|233348|2|2|the event of a sustained tariff increase on the|Y
01|233348|2|3|importation of this product.  Any surcharge will be|Y
01|233348|2|4|disclosed prior to acceptance of an order.|Y
01|233349|4|1|Please note this is a non-standard stock item and|Y
01|233349|4|2|considered special. Once PO has been issued these|Y
01|233349|4|3|cannot be cancelled or returned. These will need to be|Y
01|233349|4|4|requoted once stock is depleted.|Y
01|233349|5|1|A tariff surcharge may be added to this quotation in|Y
01|233349|5|2|the event of a sustained tariff increase on the|Y
01|233349|5|3|importation of this product.  Any surcharge will be|Y
01|233349|5|4|disclosed prior to acceptance of an order.|Y
01|233350|5|1|A tariff surcharge may be added to this quotation in|Y
01|233350|5|2|the event of a sustained tariff increase on the|Y
01|233350|5|3|importation of this product.  Any surcharge will be|Y
01|233350|5|4|disclosed prior to acceptance of an order.|Y
01|233351|4|1|A tariff surcharge may be added to this quotation in|Y
01|233351|4|2|the event of a sustained tariff increase on the|Y
01|233351|4|3|importation of this product.  Any surcharge will be|Y
01|233351|4|4|disclosed prior to acceptance of an order.|Y
01|233352|2|1|A tariff surcharge may be added to this quotation in|Y
01|233352|2|2|the event of a sustained tariff increase on the|Y
01|233352|2|3|importation of this product.  Any surcharge will be|Y
01|233352|2|4|disclosed prior to acceptance of an order.|Y
01|233353|2|1|A tariff surcharge may be added to this quotation in|Y
01|233353|2|2|the event of a sustained tariff increase on the|Y
01|233353|2|3|importation of this product.  Any surcharge will be|Y
01|233353|2|4|disclosed prior to acceptance of an order.|Y
01|233354|2|1|A tariff surcharge may be added to this quotation in|Y
01|233354|2|2|the event of a sustained tariff increase on the|Y
01|233354|2|3|importation of this product.  Any surcharge will be|Y
01|233354|2|4|disclosed prior to acceptance of an order.|Y
01|233355|2|1|A tariff surcharge may be added to this quotation in|Y
01|233355|2|2|the event of a sustained tariff increase on the|Y
01|233355|2|3|importation of this product.  Any surcharge will be|Y
01|233355|2|4|disclosed prior to acceptance of an order.|Y
01|233356|3|1|A tariff surcharge may be added to this quotation in|Y
01|233356|3|2|the event of a sustained tariff increase on the|Y
01|233356|3|3|importation of this product.  Any surcharge will be|Y
01|233356|3|4|disclosed prior to acceptance of an order.|Y
01|233357|7|1|A tariff surcharge may be added to this quotation in|Y
01|233357|7|2|the event of a sustained tariff increase on the|Y
01|233357|7|3|importation of this product.  Any surcharge will be|Y
01|233357|7|4|disclosed prior to acceptance of an order.|Y
01|233358|2|1|A tariff surcharge may be added to this quotation in|Y
01|233358|2|2|the event of a sustained tariff increase on the|Y
01|233358|2|3|importation of this product.  Any surcharge will be|Y
01|233358|2|4|disclosed prior to acceptance of an order.|Y
01|233359|3|1|A tariff surcharge may be added to this quotation in|Y
01|233359|3|2|the event of a sustained tariff increase on the|Y
01|233359|3|3|importation of this product.  Any surcharge will be|Y
01|233359|3|4|disclosed prior to acceptance of an order.|Y
01|233360|5|1|A tariff surcharge may be added to this quotation in|Y
01|233360|5|2|the event of a sustained tariff increase on the|Y
01|233360|5|3|importation of this product.  Any surcharge will be|Y
01|233360|5|4|disclosed prior to acceptance of an order.|Y
01|233361|3|1|A tariff surcharge may be added to this quotation in|Y
01|233361|3|2|the event of a sustained tariff increase on the|Y
01|233361|3|3|importation of this product.  Any surcharge will be|Y
01|233361|3|4|disclosed prior to acceptance of an order.|Y
01|233363|4|1|A tariff surcharge may be added to this quotation in|Y
01|233363|4|2|the event of a sustained tariff increase on the|Y
01|233363|4|3|importation of this product.  Any surcharge will be|Y
01|233363|4|4|disclosed prior to acceptance of an order.|Y
01|233364|1|1|This item is non-standard stock and considered special.|Y
01|233364|1|2|Non-returnable Non-cancelable.|Y
01|233364|1|3|Quoted at NET price|Y
01|233364|3|1|A tariff surcharge may be added to this quotation in|Y
01|233364|3|2|the event of a sustained tariff increase on the|Y
01|233364|3|3|importation of this product.  Any surcharge will be|Y
01|233364|3|4|disclosed prior to acceptance of an order.|Y
01|233365|1|1|C6-SK6-60P - PSC C6 Slim Chuck SK6 30K|Y
01|233365|2|1|C6-SK6-90P - PSC C6 Slim Chuck SK6 30K|Y
01|233365|4|1|C6-SK10-60P - PSC C6 Slim Chuck SK10 30K|Y
01|233365|5|1|C6-SK10-90P - PSC C6 Slim Chuck SK10 30K|Y
01|233365|6|1|C6-SK10-120P - PSC C6 Slim Chuck SK10 30K|Y
01|233365|8|1|C6-SK16-60P - PSC C6 Slim Chuck SK16 30K|Y
01|233365|9|1|C6-SK16-90P - PSC C6 Slim Chuck SK16 30K|Y
01|233365|10|1|C6-SK16-120P - PSC C6 Slim Chuck SK16 30K|Y
01|233365|12|1|C6-SK25-90P - PSC C6 Slim Chuck SK25 30K|Y
01|233365|22|1|One tube for each C6 holder.|Y
01|233365|24|1|A tariff surcharge may be added to this quotation in|Y
01|233365|24|2|the event of a sustained tariff increase on the|Y
01|233365|24|3|importation of this product.  Any surcharge will be|Y
01|233365|24|4|disclosed prior to acceptance of an order.|Y
01|233366|2|1|A tariff surcharge may be added to this quotation in|Y
01|233366|2|2|the event of a sustained tariff increase on the|Y
01|233366|2|3|importation of this product.  Any surcharge will be|Y
01|233366|2|4|disclosed prior to acceptance of an order.|Y
01|233367|3|1|A tariff surcharge may be added to this quotation in|Y
01|233367|3|2|the event of a sustained tariff increase on the|Y
01|233367|3|3|importation of this product.  Any surcharge will be|Y
01|233367|3|4|disclosed prior to acceptance of an order.|Y
01|233368|1|1|ANGULAR HEAD CAT50 L=160mm|Y
01|233368|1|2|TOOLING INTERFACE FOR COLLET SYSTEM ER40|Y
01|233368|5|1|A tariff surcharge may be added to this quotation in|Y
01|233368|5|2|the event of a sustained tariff increase on the|Y
01|233368|5|3|importation of this product.  Any surcharge will be|Y
01|233368|5|4|disclosed prior to acceptance of an order.|Y
01|233369|5|1|A tariff surcharge may be added to this quotation in|Y
01|233369|5|2|the event of a sustained tariff increase on the|Y
01|233369|5|3|importation of this product.  Any surcharge will be|Y
01|233369|5|4|disclosed prior to acceptance of an order.|Y
01|233370|-13|1|A tariff surcharge may be added to this quotation in|Y
01|233370|-13|2|the event of a sustained tariff increase on the|Y
01|233370|-13|3|importation of this product.  Any surcharge will be|Y
01|233370|-13|4|disclosed prior to acceptance of an order.|Y
01|233371|4|1|A tariff surcharge may be added to this quotation in|Y
01|233371|4|2|the event of a sustained tariff increase on the|Y
01|233371|4|3|importation of this product.  Any surcharge will be|Y
01|233371|4|4|disclosed prior to acceptance of an order.|Y
01|233372|2|1|A tariff surcharge may be added to this quotation in|Y
01|233372|2|2|the event of a sustained tariff increase on the|Y
01|233372|2|3|importation of this product.  Any surcharge will be|Y
01|233372|2|4|disclosed prior to acceptance of an order.|Y
01|233373|2|1|Alternative.Can be run dry 24/7 or w/coolant|Y
01|233373|6|1|A tariff surcharge may be added to this quotation in|Y
01|233373|6|2|the event of a sustained tariff increase on the|Y
01|233373|6|3|importation of this product.  Any surcharge will be|Y
01|233373|6|4|disclosed prior to acceptance of an order.|Y
01|233374|3|1|A tariff surcharge may be added to this quotation in|Y
01|233374|3|2|the event of a sustained tariff increase on the|Y
01|233374|3|3|importation of this product.  Any surcharge will be|Y
01|233374|3|4|disclosed prior to acceptance of an order.|Y
01|233375|2|1|A tariff surcharge may be added to this quotation in|Y
01|233375|2|2|the event of a sustained tariff increase on the|Y
01|233375|2|3|importation of this product.  Any surcharge will be|Y
01|233375|2|4|disclosed prior to acceptance of an order.|Y
01|233376|12|1|A tariff surcharge may be added to this quotation in|Y
01|233376|12|2|the event of a sustained tariff increase on the|Y
01|233376|12|3|importation of this product.  Any surcharge will be|Y
01|233376|12|4|disclosed prior to acceptance of an order.|Y
01|233377|3|1|A tariff surcharge may be added to this quotation in|Y
01|233377|3|2|the event of a sustained tariff increase on the|Y
01|233377|3|3|importation of this product.  Any surcharge will be|Y
01|233377|3|4|disclosed prior to acceptance of an order.|Y
01|233378|2|1|A tariff surcharge may be added to this quotation in|Y
01|233378|2|2|the event of a sustained tariff increase on the|Y
01|233378|2|3|importation of this product.  Any surcharge will be|Y
01|233378|2|4|disclosed prior to acceptance of an order.|Y
01|233379|3|1|A tariff surcharge may be added to this quotation in|Y
01|233379|3|2|the event of a sustained tariff increase on the|Y
01|233379|3|3|importation of this product.  Any surcharge will be|Y
01|233379|3|4|disclosed prior to acceptance of an order.|Y
01|233380|4|1|A tariff surcharge may be added to this quotation in|Y
01|233380|4|2|the event of a sustained tariff increase on the|Y
01|233380|4|3|importation of this product.  Any surcharge will be|Y
01|233380|4|4|disclosed prior to acceptance of an order.|Y
01|233381|2|1|A tariff surcharge may be added to this quotation in|Y
01|233381|2|2|the event of a sustained tariff increase on the|Y
01|233381|2|3|importation of this product.  Any surcharge will be|Y
01|233381|2|4|disclosed prior to acceptance of an order.|Y
01|233382|2|1|A tariff surcharge may be added to this quotation in|Y
01|233382|2|2|the event of a sustained tariff increase on the|Y
01|233382|2|3|importation of this product.  Any surcharge will be|Y
01|233382|2|4|disclosed prior to acceptance of an order.|Y
01|233383|4|1|A tariff surcharge may be added to this quotation in|Y
01|233383|4|2|the event of a sustained tariff increase on the|Y
01|233383|4|3|importation of this product.  Any surcharge will be|Y
01|233383|4|4|disclosed prior to acceptance of an order.|Y
01|233384|1|1|P/N:  TBD After approval drawing.|Y
01|233384|1|2|Mazak Cybertech Turn 4500 MT is as follows:|Y
01|233384|1|3|L1 = 190mm; ratio i=1:1; Shank BMT50 DIN ISO 10889|Y
01|233384|1|4|Interface CAT-40 SK40; Coolant Supply centrally through|Y
01|233384|1|5|the spindle and externally and external; reversal of|Y
01|233384|1|6|direction rotation; max.coolant pressure: p(max)=70 bar|Y
01|233384|1|7|max. torque: M(max)= 150 Nm; max.speed:n(max)=3000 RPM|Y
01|233384|1|8|weight: approx. 38 kg|Y
01|233384|1|9|wrench: 1 x 107566 hook wrench + 1 x 195980 hook wrench|Y
01|233384|15|1|A tariff surcharge may be added to this quotation in|Y
01|233384|15|2|the event of a sustained tariff increase on the|Y
01|233384|15|3|importation of this product.  Any surcharge will be|Y
01|233384|15|4|disclosed prior to acceptance of an order.|Y
01|233385|5|1|NO COOLANT|Y
01|233385|6|1|INTERNAL COOLANT|Y
01|233385|7|1|3~5 days after design is complete.|Y
01|233385|13|1|NO COOLANT|Y
01|233385|14|1|INTERNAL COOLANT|Y
01|233385|15|1|3~5 days after design is complete.|Y
01|233385|21|1|NO COOLANT|Y
01|233385|22|1|INTERNAL COOLANT|Y
01|233385|23|1|3~5 days after design is complete.|Y
01|233385|28|1|A tariff surcharge may be added to this quotation in|Y
01|233385|28|2|the event of a sustained tariff increase on the|Y
01|233385|28|3|importation of this product.  Any surcharge will be|Y
01|233385|28|4|disclosed prior to acceptance of an order.|Y
01|233386|2|1|A tariff surcharge may be added to this quotation in|Y
01|233386|2|2|the event of a sustained tariff increase on the|Y
01|233386|2|3|importation of this product.  Any surcharge will be|Y
01|233386|2|4|disclosed prior to acceptance of an order.|Y
01|233387|2|1|A tariff surcharge may be added to this quotation in|Y
01|233387|2|2|the event of a sustained tariff increase on the|Y
01|233387|2|3|importation of this product.  Any surcharge will be|Y
01|233387|2|4|disclosed prior to acceptance of an order.|Y
01|233388|3|1|A tariff surcharge may be added to this quotation in|Y
01|233388|3|2|the event of a sustained tariff increase on the|Y
01|233388|3|3|importation of this product.  Any surcharge will be|Y
01|233388|3|4|disclosed prior to acceptance of an order.|Y
01|233389|1|1|RGA#LVR-61908/|Y
01|233389|1|2|Repair of MZL60-ER32(X)-SP s/n: 22905616 02|Y
01|233389|1|3|(Mimatic#176581)|Y
01|233389|2|1|Bearings seals o-rings damaged ER32 spindle and|Y
01|233389|2|2|damaged input spindle to be replaced.|Y
01|233389|3|1|A tariff surcharge may be added to this quotation in|Y
01|233389|3|2|the event of a sustained tariff increase on the|Y
01|233389|3|3|importation of this product.  Any surcharge will be|Y
01|233389|3|4|disclosed prior to acceptance of an order.|Y
01|233390|5|1|A tariff surcharge may be added to this quotation in|Y
01|233390|5|2|the event of a sustained tariff increase on the|Y
01|233390|5|3|importation of this product.  Any surcharge will be|Y
01|233390|5|4|disclosed prior to acceptance of an order.|Y
01|233391|3|1|A tariff surcharge may be added to this quotation in|Y
01|233391|3|2|the event of a sustained tariff increase on the|Y
01|233391|3|3|importation of this product.  Any surcharge will be|Y
01|233391|3|4|disclosed prior to acceptance of an order.|Y
01|233392|2|1|A tariff surcharge may be added to this quotation in|Y
01|233392|2|2|the event of a sustained tariff increase on the|Y
01|233392|2|3|importation of this product.  Any surcharge will be|Y
01|233392|2|4|disclosed prior to acceptance of an order.|Y
01|233393|2|1|A tariff surcharge may be added to this quotation in|Y
01|233393|2|2|the event of a sustained tariff increase on the|Y
01|233393|2|3|importation of this product.  Any surcharge will be|Y
01|233393|2|4|disclosed prior to acceptance of an order.|Y
01|233394|2|1|A tariff surcharge may be added to this quotation in|Y
01|233394|2|2|the event of a sustained tariff increase on the|Y
01|233394|2|3|importation of this product.  Any surcharge will be|Y
01|233394|2|4|disclosed prior to acceptance of an order.|Y
01|233395|3|1|A tariff surcharge may be added to this quotation in|Y
01|233395|3|2|the event of a sustained tariff increase on the|Y
01|233395|3|3|importation of this product.  Any surcharge will be|Y
01|233395|3|4|disclosed prior to acceptance of an order.|Y
01|233396|2|1|A tariff surcharge may be added to this quotation in|Y
01|233396|2|2|the event of a sustained tariff increase on the|Y
01|233396|2|3|importation of this product.  Any surcharge will be|Y
01|233396|2|4|disclosed prior to acceptance of an order.|Y
01|233397|2|1|A tariff surcharge may be added to this quotation in|Y
01|233397|2|2|the event of a sustained tariff increase on the|Y
01|233397|2|3|importation of this product.  Any surcharge will be|Y
01|233397|2|4|disclosed prior to acceptance of an order.|Y
01|233398|14|1|A tariff surcharge may be added to this quotation in|Y
01|233398|14|2|the event of a sustained tariff increase on the|Y
01|233398|14|3|importation of this product.  Any surcharge will be|Y
01|233398|14|4|disclosed prior to acceptance of an order.|Y
01|233399|18|1|A tariff surcharge may be added to this quotation in|Y
01|233399|18|2|the event of a sustained tariff increase on the|Y
01|233399|18|3|importation of this product.  Any surcharge will be|Y
01|233399|18|4|disclosed prior to acceptance of an order.|Y
01|233400|5|1|A tariff surcharge may be added to this quotation in|Y
01|233400|5|2|the event of a sustained tariff increase on the|Y
01|233400|5|3|importation of this product.  Any surcharge will be|Y
01|233400|5|4|disclosed prior to acceptance of an order.|Y
01|233401|17|1|A tariff surcharge may be added to this quotation in|Y
01|233401|17|2|the event of a sustained tariff increase on the|Y
01|233401|17|3|importation of this product.  Any surcharge will be|Y
01|233401|17|4|disclosed prior to acceptance of an order.|Y
01|233402|2|1|A tariff surcharge may be added to this quotation in|Y
01|233402|2|2|the event of a sustained tariff increase on the|Y
01|233402|2|3|importation of this product.  Any surcharge will be|Y
01|233402|2|4|disclosed prior to acceptance of an order.|Y
01|233403|2|1|A tariff surcharge may be added to this quotation in|Y
01|233403|2|2|the event of a sustained tariff increase on the|Y
01|233403|2|3|importation of this product.  Any surcharge will be|Y
01|233403|2|4|disclosed prior to acceptance of an order.|Y
01|233404|4|1|A tariff surcharge may be added to this quotation in|Y
01|233404|4|2|the event of a sustained tariff increase on the|Y
01|233404|4|3|importation of this product.  Any surcharge will be|Y
01|233404|4|4|disclosed prior to acceptance of an order.|Y
01|233405|3|1|A tariff surcharge may be added to this quotation in|Y
01|233405|3|2|the event of a sustained tariff increase on the|Y
01|233405|3|3|importation of this product.  Any surcharge will be|Y
01|233405|3|4|disclosed prior to acceptance of an order.|Y
01|233406|5|1|A tariff surcharge may be added to this quotation in|Y
01|233406|5|2|the event of a sustained tariff increase on the|Y
01|233406|5|3|importation of this product.  Any surcharge will be|Y
01|233406|5|4|disclosed prior to acceptance of an order.|Y
01|233407|2|1|A tariff surcharge may be added to this quotation in|Y
01|233407|2|2|the event of a sustained tariff increase on the|Y
01|233407|2|3|importation of this product.  Any surcharge will be|Y
01|233407|2|4|disclosed prior to acceptance of an order.|Y
01|233408|2|1|A tariff surcharge may be added to this quotation in|Y
01|233408|2|2|the event of a sustained tariff increase on the|Y
01|233408|2|3|importation of this product.  Any surcharge will be|Y
01|233408|2|4|disclosed prior to acceptance of an order.|Y
01|233409|2|1|A tariff surcharge may be added to this quotation in|Y
01|233409|2|2|the event of a sustained tariff increase on the|Y
01|233409|2|3|importation of this product.  Any surcharge will be|Y
01|233409|2|4|disclosed prior to acceptance of an order.|Y
01|233410|17|1|A tariff surcharge may be added to this quotation in|Y
01|233410|17|2|the event of a sustained tariff increase on the|Y
01|233410|17|3|importation of this product.  Any surcharge will be|Y
01|233410|17|4|disclosed prior to acceptance of an order.|Y
01|233411|1|1|RGA#TOR-61836/|Y
01|233411|1|2|Repair of CAT50-C1.1/4-105U|Y
01|233411|6|1|RGA#TOR-61836/|Y
01|233411|6|2|Repair of CAT50-C1-135U-IDI|Y
01|233411|11|1|RGA#TOR-61836/|Y
01|233411|11|2|Repair of CAT50-C1-135U-IDI|Y
01|233411|16|1|RGA#TOR-61836/|Y
01|233411|16|2|Repair of CAT50-C3/4-135U-IDU|Y
01|233411|21|1|RGA#TOR-61836/|Y
01|233411|21|2|Repair of HSK100A-C3/4-115-IDI|Y
01|233411|26|1|RGA#TOR-61836/|Y
01|233411|26|2|Repair of HSK100A-C3/4-115|Y
01|233411|31|1|RGA#TOR-61836/|Y
01|233411|31|2|Repair of HSK100A-C3/4-115|Y
01|233411|36|1|RGA#TOR-61836/|Y
01|233411|36|2|Repair of HSK100A-C1-115|Y
01|233411|41|1|RGA#TOR-61836/|Y
01|233411|41|2|Repair of HSK100A-C1-115|Y
01|233411|46|1|RGA#TOR-61836/|Y
01|233411|46|2|Repair of HSK100A-C1-135|Y
01|233411|50|1|A tariff surcharge may be added to this quotation in|Y
01|233411|50|2|the event of a sustained tariff increase on the|Y
01|233411|50|3|importation of this product.  Any surcharge will be|Y
01|233411|50|4|disclosed prior to acceptance of an order.|Y
01|233412|1|1|Model HO9M9 K597: a package of chuck body/base jar/|Y
01|233412|1|2|insert jaws/stoppers/forming plug/test pieces|Y
01|233412|1|3|Machine: Kanzaki  Type: MV5  Mach NO. 0650501|Y
01|233412|2|1|A tariff surcharge may be added to this quotation in|Y
01|233412|2|2|the event of a sustained tariff increase on the|Y
01|233412|2|3|importation of this product.  Any surcharge will be|Y
01|233412|2|4|disclosed prior to acceptance of an order.|Y
01|233413|1|1|Quoted at NET price.|Y
01|233413|2|1|Quoted at NET price.|Y
01|233413|4|1|A tariff surcharge may be added to this quotation in|Y
01|233413|4|2|the event of a sustained tariff increase on the|Y
01|233413|4|3|importation of this product.  Any surcharge will be|Y
01|233413|4|4|disclosed prior to acceptance of an order.|Y
01|233413|17|1|Quoted at Net price.|Y
01|233414|2|1|A tariff surcharge may be added to this quotation in|Y
01|233414|2|2|the event of a sustained tariff increase on the|Y
01|233414|2|3|importation of this product.  Any surcharge will be|Y
01|233414|2|4|disclosed prior to acceptance of an order.|Y
01|233415|11|1|A tariff surcharge may be added to this quotation in|Y
01|233415|11|2|the event of a sustained tariff increase on the|Y
01|233415|11|3|importation of this product.  Any surcharge will be|Y
01|233415|11|4|disclosed prior to acceptance of an order.|Y
01|233416|12|1|A tariff surcharge may be added to this quotation in|Y
01|233416|12|2|the event of a sustained tariff increase on the|Y
01|233416|12|3|importation of this product.  Any surcharge will be|Y
01|233416|12|4|disclosed prior to acceptance of an order.|Y
01|233417|1|1|LEAD TIME HAS BEEN REQUESTED. CURRENTLY REPLENSHING|Y
01|233417|1|2|STOCK AS WE INVENTORY A MIN. OF 1 PC.|Y
01|233417|2|1|MACHINE = HAAS VF2 PLEASE CONFIRM AT TIME OF ORDER|Y
01|233417|3|1|A tariff surcharge may be added to this quotation in|Y
01|233417|3|2|the event of a sustained tariff increase on the|Y
01|233417|3|3|importation of this product.  Any surcharge will be|Y
01|233417|3|4|disclosed prior to acceptance of an order.|Y
01|233418|19|1|A tariff surcharge may be added to this quotation in|Y
01|233418|19|2|the event of a sustained tariff increase on the|Y
01|233418|19|3|importation of this product.  Any surcharge will be|Y
01|233418|19|4|disclosed prior to acceptance of an order.|Y
01|233419|3|1|A tariff surcharge may be added to this quotation in|Y
01|233419|3|2|the event of a sustained tariff increase on the|Y
01|233419|3|3|importation of this product.  Any surcharge will be|Y
01|233419|3|4|disclosed prior to acceptance of an order.|Y
01|233420|13|1|A tariff surcharge may be added to this quotation in|Y
01|233420|13|2|the event of a sustained tariff increase on the|Y
01|233420|13|3|importation of this product.  Any surcharge will be|Y
01|233420|13|4|disclosed prior to acceptance of an order.|Y
01|233421|7|1|A tariff surcharge may be added to this quotation in|Y
01|233421|7|2|the event of a sustained tariff increase on the|Y
01|233421|7|3|importation of this product.  Any surcharge will be|Y
01|233421|7|4|disclosed prior to acceptance of an order.|Y
01|233422|1|1|RGA#TOR-61938/|Y
01|233422|1|2|Repair of SF-START2-UNIT-200 s/n: 2J7184|Y
01|233422|4|1|A tariff surcharge may be added to this quotation in|Y
01|233422|4|2|the event of a sustained tariff increase on the|Y
01|233422|4|3|importation of this product.  Any surcharge will be|Y
01|233422|4|4|disclosed prior to acceptance of an order.|Y
01|233423|3|1|A tariff surcharge may be added to this quotation in|Y
01|233423|3|2|the event of a sustained tariff increase on the|Y
01|233423|3|3|importation of this product.  Any surcharge will be|Y
01|233423|3|4|disclosed prior to acceptance of an order.|Y
01|233424|9|1|A tariff surcharge may be added to this quotation in|Y
01|233424|9|2|the event of a sustained tariff increase on the|Y
01|233424|9|3|importation of this product.  Any surcharge will be|Y
01|233424|9|4|disclosed prior to acceptance of an order.|Y
01|233425|2|1|A tariff surcharge may be added to this quotation in|Y
01|233425|2|2|the event of a sustained tariff increase on the|Y
01|233425|2|3|importation of this product.  Any surcharge will be|Y
01|233425|2|4|disclosed prior to acceptance of an order.|Y
01|233426|5|1|A tariff surcharge may be added to this quotation in|Y
01|233426|5|2|the event of a sustained tariff increase on the|Y
01|233426|5|3|importation of this product.  Any surcharge will be|Y
01|233426|5|4|disclosed prior to acceptance of an order.|Y
01|233427|1|1|CAT50 ER25 IC heads|Y
01|233427|3|1|A tariff surcharge may be added to this quotation in|Y
01|233427|3|2|the event of a sustained tariff increase on the|Y
01|233427|3|3|importation of this product.  Any surcharge will be|Y
01|233427|3|4|disclosed prior to acceptance of an order.|Y
01|233428|2|1|A tariff surcharge may be added to this quotation in|Y
01|233428|2|2|the event of a sustained tariff increase on the|Y
01|233428|2|3|importation of this product.  Any surcharge will be|Y
01|233428|2|4|disclosed prior to acceptance of an order.|Y
01|233429|2|1|A tariff surcharge may be added to this quotation in|Y
01|233429|2|2|the event of a sustained tariff increase on the|Y
01|233429|2|3|importation of this product.  Any surcharge will be|Y
01|233429|2|4|disclosed prior to acceptance of an order.|Y
01|233430|2|1|A tariff surcharge may be added to this quotation in|Y
01|233430|2|2|the event of a sustained tariff increase on the|Y
01|233430|2|3|importation of this product.  Any surcharge will be|Y
01|233430|2|4|disclosed prior to acceptance of an order.|Y
01|233431|2|1|Please note additional 20% discount applied for|Y
01|233431|2|2|our Overstock Promotion.  This item cannot be cancelled|Y
01|233431|2|3|or returned upon receipt of a Purchase Order.  This|Y
01|233431|2|4|item is a FINAL SALE.|Y
01|233431|3|1|A tariff surcharge may be added to this quotation in|Y
01|233431|3|2|the event of a sustained tariff increase on the|Y
01|233431|3|3|importation of this product.  Any surcharge will be|Y
01|233431|3|4|disclosed prior to acceptance of an order.|Y
01|233432|1|1|HSK63A-SK20C-105|Y
01|233432|3|1|SK20-6P|Y
01|233432|6|1|A tariff surcharge may be added to this quotation in|Y
01|233432|6|2|the event of a sustained tariff increase on the|Y
01|233432|6|3|importation of this product.  Any surcharge will be|Y
01|233432|6|4|disclosed prior to acceptance of an order.|Y
01|233433|2|1|A tariff surcharge may be added to this quotation in|Y
01|233433|2|2|the event of a sustained tariff increase on the|Y
01|233433|2|3|importation of this product.  Any surcharge will be|Y
01|233433|2|4|disclosed prior to acceptance of an order.|Y
01|233434|3|1|A tariff surcharge may be added to this quotation in|Y
01|233434|3|2|the event of a sustained tariff increase on the|Y
01|233434|3|3|importation of this product.  Any surcharge will be|Y
01|233434|3|4|disclosed prior to acceptance of an order.|Y
01|233435|2|1|A tariff surcharge may be added to this quotation in|Y
01|233435|2|2|the event of a sustained tariff increase on the|Y
01|233435|2|3|importation of this product.  Any surcharge will be|Y
01|233435|2|4|disclosed prior to acceptance of an order.|Y
01|233436|2|1|A tariff surcharge may be added to this quotation in|Y
01|233436|2|2|the event of a sustained tariff increase on the|Y
01|233436|2|3|importation of this product.  Any surcharge will be|Y
01|233436|2|4|disclosed prior to acceptance of an order.|Y
01|233437|4|1|A tariff surcharge may be added to this quotation in|Y
01|233437|4|2|the event of a sustained tariff increase on the|Y
01|233437|4|3|importation of this product.  Any surcharge will be|Y
01|233437|4|4|disclosed prior to acceptance of an order.|Y
01|233438|2|1|A tariff surcharge may be added to this quotation in|Y
01|233438|2|2|the event of a sustained tariff increase on the|Y
01|233438|2|3|importation of this product.  Any surcharge will be|Y
01|233438|2|4|disclosed prior to acceptance of an order.|Y
01|233439|3|1|A tariff surcharge may be added to this quotation in|Y
01|233439|3|2|the event of a sustained tariff increase on the|Y
01|233439|3|3|importation of this product.  Any surcharge will be|Y
01|233439|3|4|disclosed prior to acceptance of an order.|Y
01|233440|2|1|A tariff surcharge may be added to this quotation in|Y
01|233440|2|2|the event of a sustained tariff increase on the|Y
01|233440|2|3|importation of this product.  Any surcharge will be|Y
01|233440|2|4|disclosed prior to acceptance of an order.|Y
01|233441|13|1|A tariff surcharge may be added to this quotation in|Y
01|233441|13|2|the event of a sustained tariff increase on the|Y
01|233441|13|3|importation of this product.  Any surcharge will be|Y
01|233441|13|4|disclosed prior to acceptance of an order.|Y
01|233442|2|1|A tariff surcharge may be added to this quotation in|Y
01|233442|2|2|the event of a sustained tariff increase on the|Y
01|233442|2|3|importation of this product.  Any surcharge will be|Y
01|233442|2|4|disclosed prior to acceptance of an order.|Y
01|233443|2|1|A tariff surcharge may be added to this quotation in|Y
01|233443|2|2|the event of a sustained tariff increase on the|Y
01|233443|2|3|importation of this product.  Any surcharge will be|Y
01|233443|2|4|disclosed prior to acceptance of an order.|Y
01|233444|1|1|**Quoted at NET price**|Y
01|233444|1|2|This item is special non-standard stock. Cannot be|Y
01|233444|1|3|cancelled or returned upon receipt of a PO.|Y
01|233444|1|4|Please allow for 1-2 Wks design time. MFG+Shipping is|Y
01|233444|1|5|10-12 Wks after customer signs approval drawing.|Y
01|233444|2|1|A tariff surcharge may be added to this quotation in|Y
01|233444|2|2|the event of a sustained tariff increase on the|Y
01|233444|2|3|importation of this product.  Any surcharge will be|Y
01|233444|2|4|disclosed prior to acceptance of an order.|Y
01|233445|4|1|A tariff surcharge may be added to this quotation in|Y
01|233445|4|2|the event of a sustained tariff increase on the|Y
01|233445|4|3|importation of this product.  Any surcharge will be|Y
01|233445|4|4|disclosed prior to acceptance of an order.|Y
01|233446|4|1|A tariff surcharge may be added to this quotation in|Y
01|233446|4|2|the event of a sustained tariff increase on the|Y
01|233446|4|3|importation of this product.  Any surcharge will be|Y
01|233446|4|4|disclosed prior to acceptance of an order.|Y
01|233447|2|1|A tariff surcharge may be added to this quotation in|Y
01|233447|2|2|the event of a sustained tariff increase on the|Y
01|233447|2|3|importation of this product.  Any surcharge will be|Y
01|233447|2|4|disclosed prior to acceptance of an order.|Y
01|233448|2|1|A tariff surcharge may be added to this quotation in|Y
01|233448|2|2|the event of a sustained tariff increase on the|Y
01|233448|2|3|importation of this product.  Any surcharge will be|Y
01|233448|2|4|disclosed prior to acceptance of an order.|Y
01|233450|2|1|A tariff surcharge may be added to this quotation in|Y
01|233450|2|2|the event of a sustained tariff increase on the|Y
01|233450|2|3|importation of this product.  Any surcharge will be|Y
01|233450|2|4|disclosed prior to acceptance of an order.|Y
01|233451|3|1|A tariff surcharge may be added to this quotation in|Y
01|233451|3|2|the event of a sustained tariff increase on the|Y
01|233451|3|3|importation of this product.  Any surcharge will be|Y
01|233451|3|4|disclosed prior to acceptance of an order.|Y
01|233452|2|1|A tariff surcharge may be added to this quotation in|Y
01|233452|2|2|the event of a sustained tariff increase on the|Y
01|233452|2|3|importation of this product.  Any surcharge will be|Y
01|233452|2|4|disclosed prior to acceptance of an order.|Y
01|233454|5|1|A tariff surcharge may be added to this quotation in|Y
01|233454|5|2|the event of a sustained tariff increase on the|Y
01|233454|5|3|importation of this product.  Any surcharge will be|Y
01|233454|5|4|disclosed prior to acceptance of an order.|Y
01|233455|4|1|A tariff surcharge may be added to this quotation in|Y
01|233455|4|2|the event of a sustained tariff increase on the|Y
01|233455|4|3|importation of this product.  Any surcharge will be|Y
01|233455|4|4|disclosed prior to acceptance of an order.|Y
01|233456|5|1|A tariff surcharge may be added to this quotation in|Y
01|233456|5|2|the event of a sustained tariff increase on the|Y
01|233456|5|3|importation of this product.  Any surcharge will be|Y
01|233456|5|4|disclosed prior to acceptance of an order.|Y
01|233458|3|1|A tariff surcharge may be added to this quotation in|Y
01|233458|3|2|the event of a sustained tariff increase on the|Y
01|233458|3|3|importation of this product.  Any surcharge will be|Y
01|233458|3|4|disclosed prior to acceptance of an order.|Y
01|233459|12|1|A tariff surcharge may be added to this quotation in|Y
01|233459|12|2|the event of a sustained tariff increase on the|Y
01|233459|12|3|importation of this product.  Any surcharge will be|Y
01|233459|12|4|disclosed prior to acceptance of an order.|Y
01|233460|2|1|A tariff surcharge may be added to this quotation in|Y
01|233460|2|2|the event of a sustained tariff increase on the|Y
01|233460|2|3|importation of this product.  Any surcharge will be|Y
01|233460|2|4|disclosed prior to acceptance of an order.|Y
01|233461|3|1|A tariff surcharge may be added to this quotation in|Y
01|233461|3|2|the event of a sustained tariff increase on the|Y
01|233461|3|3|importation of this product.  Any surcharge will be|Y
01|233461|3|4|disclosed prior to acceptance of an order.|Y
01|233462|2|1|A tariff surcharge may be added to this quotation in|Y
01|233462|2|2|the event of a sustained tariff increase on the|Y
01|233462|2|3|importation of this product.  Any surcharge will be|Y
01|233462|2|4|disclosed prior to acceptance of an order.|Y
01|233463|2|1|A tariff surcharge may be added to this quotation in|Y
01|233463|2|2|the event of a sustained tariff increase on the|Y
01|233463|2|3|importation of this product.  Any surcharge will be|Y
01|233463|2|4|disclosed prior to acceptance of an order.|Y
01|233464|9|1|A tariff surcharge may be added to this quotation in|Y
01|233464|9|2|the event of a sustained tariff increase on the|Y
01|233464|9|3|importation of this product.  Any surcharge will be|Y
01|233464|9|4|disclosed prior to acceptance of an order.|Y
01|233465|2|1|A tariff surcharge may be added to this quotation in|Y
01|233465|2|2|the event of a sustained tariff increase on the|Y
01|233465|2|3|importation of this product.  Any surcharge will be|Y
01|233465|2|4|disclosed prior to acceptance of an order.|Y
01|233466|4|1|A tariff surcharge may be added to this quotation in|Y
01|233466|4|2|the event of a sustained tariff increase on the|Y
01|233466|4|3|importation of this product.  Any surcharge will be|Y
01|233466|4|4|disclosed prior to acceptance of an order.|Y
01|233467|5|1|A tariff surcharge may be added to this quotation in|Y
01|233467|5|2|the event of a sustained tariff increase on the|Y
01|233467|5|3|importation of this product.  Any surcharge will be|Y
01|233467|5|4|disclosed prior to acceptance of an order.|Y
01|233468|2|1|A tariff surcharge may be added to this quotation in|Y
01|233468|2|2|the event of a sustained tariff increase on the|Y
01|233468|2|3|importation of this product.  Any surcharge will be|Y
01|233468|2|4|disclosed prior to acceptance of an order.|Y
01|233469|1|1|1st batch(w/IDU)>11/12/24 APRVD(TimR)|Y
01|233469|2|1|A tariff surcharge may be added to this quotation in|Y
01|233469|2|2|the event of a sustained tariff increase on the|Y
01|233469|2|3|importation of this product.  Any surcharge will be|Y
01|233469|2|4|disclosed prior to acceptance of an order.|Y
01|233470|2|1|A tariff surcharge may be added to this quotation in|Y
01|233470|2|2|the event of a sustained tariff increase on the|Y
01|233470|2|3|importation of this product.  Any surcharge will be|Y
01|233470|2|4|disclosed prior to acceptance of an order.|Y
01|233471|2|1|A tariff surcharge may be added to this quotation in|Y
01|233471|2|2|the event of a sustained tariff increase on the|Y
01|233471|2|3|importation of this product.  Any surcharge will be|Y
01|233471|2|4|disclosed prior to acceptance of an order.|Y
01|233472|3|1|A tariff surcharge may be added to this quotation in|Y
01|233472|3|2|the event of a sustained tariff increase on the|Y
01|233472|3|3|importation of this product.  Any surcharge will be|Y
01|233472|3|4|disclosed prior to acceptance of an order.|Y
01|233473|7|1|A tariff surcharge may be added to this quotation in|Y
01|233473|7|2|the event of a sustained tariff increase on the|Y
01|233473|7|3|importation of this product.  Any surcharge will be|Y
01|233473|7|4|disclosed prior to acceptance of an order.|Y
01|233475|3|1|A tariff surcharge may be added to this quotation in|Y
01|233475|3|2|the event of a sustained tariff increase on the|Y
01|233475|3|3|importation of this product.  Any surcharge will be|Y
01|233475|3|4|disclosed prior to acceptance of an order.|Y
01|233476|2|1|A tariff surcharge may be added to this quotation in|Y
01|233476|2|2|the event of a sustained tariff increase on the|Y
01|233476|2|3|importation of this product.  Any surcharge will be|Y
01|233476|2|4|disclosed prior to acceptance of an order.|Y
01|233477|4|1|A tariff surcharge may be added to this quotation in|Y
01|233477|4|2|the event of a sustained tariff increase on the|Y
01|233477|4|3|importation of this product.  Any surcharge will be|Y
01|233477|4|4|disclosed prior to acceptance of an order.|Y
01|233478|1|1|No Inspection Required.|Y
01|233478|2|1|No Inspection Required.|Y
01|233478|3|1|No Inspection Required.|Y
01|233478|4|1|No Inspection Required.|Y
01|233478|5|1|A tariff surcharge may be added to this quotation in|Y
01|233478|5|2|the event of a sustained tariff increase on the|Y
01|233478|5|3|importation of this product.  Any surcharge will be|Y
01|233478|5|4|disclosed prior to acceptance of an order.|Y
01|233479|2|1|A tariff surcharge may be added to this quotation in|Y
01|233479|2|2|the event of a sustained tariff increase on the|Y
01|233479|2|3|importation of this product.  Any surcharge will be|Y
01|233479|2|4|disclosed prior to acceptance of an order.|Y
01|233480|9|1|A tariff surcharge may be added to this quotation in|Y
01|233480|9|2|the event of a sustained tariff increase on the|Y
01|233480|9|3|importation of this product.  Any surcharge will be|Y
01|233480|9|4|disclosed prior to acceptance of an order.|Y
01|233481|2|1|A tariff surcharge may be added to this quotation in|Y
01|233481|2|2|the event of a sustained tariff increase on the|Y
01|233481|2|3|importation of this product.  Any surcharge will be|Y
01|233481|2|4|disclosed prior to acceptance of an order.|Y
01|233482|7|1|A tariff surcharge may be added to this quotation in|Y
01|233482|7|2|the event of a sustained tariff increase on the|Y
01|233482|7|3|importation of this product.  Any surcharge will be|Y
01|233482|7|4|disclosed prior to acceptance of an order.|Y
01|233483|3|1|A tariff surcharge may be added to this quotation in|Y
01|233483|3|2|the event of a sustained tariff increase on the|Y
01|233483|3|3|importation of this product.  Any surcharge will be|Y
01|233483|3|4|disclosed prior to acceptance of an order.|Y
01|233484|4|1|A tariff surcharge may be added to this quotation in|Y
01|233484|4|2|the event of a sustained tariff increase on the|Y
01|233484|4|3|importation of this product.  Any surcharge will be|Y
01|233484|4|4|disclosed prior to acceptance of an order.|Y
01|233485|1|1|C50RAM-ER25-180IC-110TP|Y
01|233485|1|2|CAT50 - ER25 OUTPUT - INTERNAL COOLANT ONLY|Y
01|233485|1|3|OVERALL GAUGE LENGTH 180MM|Y
01|233485|1|4|DRAWING #A193479|Y
01|233485|2|1|CUSTOM POSITIONING/ANTI-ROTATION BLOCK FOR MAZAK|Y
01|233485|2|2|6800NEO HMC MACHINES|Y
01|233485|3|1|A tariff surcharge may be added to this quotation in|Y
01|233485|3|2|the event of a sustained tariff increase on the|Y
01|233485|3|3|importation of this product.  Any surcharge will be|Y
01|233485|3|4|disclosed prior to acceptance of an order.|Y
01|233486|2|1|CUSTOM POSITIONING/ANTI-ROTATION BLOCK FOR MAZAK|Y
01|233486|2|2|6800NEO HMC MACHINES|Y
01|233486|3|1|A tariff surcharge may be added to this quotation in|Y
01|233486|3|2|the event of a sustained tariff increase on the|Y
01|233486|3|3|importation of this product.  Any surcharge will be|Y
01|233486|3|4|disclosed prior to acceptance of an order.|Y
01|233487|3|1|C5006-40-6.00 CAT50 End Mill Holder 40mm 25K|Y
01|233487|3|2|Part number to be determined.|Y
01|233487|3|3|Please note these are Specials once a purchase order|Y
01|233487|3|4|is placed they cannot be cancelled or returned.|Y
01|233487|4|1|A tariff surcharge may be added to this quotation in|Y
01|233487|4|2|the event of a sustained tariff increase on the|Y
01|233487|4|3|importation of this product.  Any surcharge will be|Y
01|233487|4|4|disclosed prior to acceptance of an order.|Y
01|233488|5|1|A tariff surcharge may be added to this quotation in|Y
01|233488|5|2|the event of a sustained tariff increase on the|Y
01|233488|5|3|importation of this product.  Any surcharge will be|Y
01|233488|5|4|disclosed prior to acceptance of an order.|Y
01|233489|13|1|A tariff surcharge may be added to this quotation in|Y
01|233489|13|2|the event of a sustained tariff increase on the|Y
01|233489|13|3|importation of this product.  Any surcharge will be|Y
01|233489|13|4|disclosed prior to acceptance of an order.|Y
01|233490|2|1|A tariff surcharge may be added to this quotation in|Y
01|233490|2|2|the event of a sustained tariff increase on the|Y
01|233490|2|3|importation of this product.  Any surcharge will be|Y
01|233490|2|4|disclosed prior to acceptance of an order.|Y
01|233491|3|1|A tariff surcharge may be added to this quotation in|Y
01|233491|3|2|the event of a sustained tariff increase on the|Y
01|233491|3|3|importation of this product.  Any surcharge will be|Y
01|233491|3|4|disclosed prior to acceptance of an order.|Y
01|233492|4|1|A tariff surcharge may be added to this quotation in|Y
01|233492|4|2|the event of a sustained tariff increase on the|Y
01|233492|4|3|importation of this product.  Any surcharge will be|Y
01|233492|4|4|disclosed prior to acceptance of an order.|Y
01|233493|2|1|A tariff surcharge may be added to this quotation in|Y
01|233493|2|2|the event of a sustained tariff increase on the|Y
01|233493|2|3|importation of this product.  Any surcharge will be|Y
01|233493|2|4|disclosed prior to acceptance of an order.|Y
01|233494|3|1|A tariff surcharge may be added to this quotation in|Y
01|233494|3|2|the event of a sustained tariff increase on the|Y
01|233494|3|3|importation of this product.  Any surcharge will be|Y
01|233494|3|4|disclosed prior to acceptance of an order.|Y
01|233495|1|1|Special 3/4 SM Static Tool for Mori.Shaft BMT-turret|Y
01|233495|1|2|D=60mm S1-91mm.Drive twoflat SW=79mm.Clamping w/shell|Y
01|233495|1|3|mill arbor holder O 1905 mm (3/4).Coolant supply|Y
01|233495|1|4|through spindle & via coolant pipe.Revesal of rotation|Y
01|233495|1|5|Central-offset V=50mm 61+app.120mmratio:i(n1/n2)= 2:1|Y
01|233495|1|6|max. pressure:p(max)=70 barmax. torque:M(max)=80 Nm|Y
01|233495|1|7|-max.speed:n1(max)= 8.500rpmmax.speed:n2(max)=4.250rpm|Y
01|233495|19|1|A tariff surcharge may be added to this quotation in|Y
01|233495|19|2|the event of a sustained tariff increase on the|Y
01|233495|19|3|importation of this product.  Any surcharge will be|Y
01|233495|19|4|disclosed prior to acceptance of an order.|Y
01|233496|8|1|A tariff surcharge may be added to this quotation in|Y
01|233496|8|2|the event of a sustained tariff increase on the|Y
01|233496|8|3|importation of this product.  Any surcharge will be|Y
01|233496|8|4|disclosed prior to acceptance of an order.|Y
01|233497|2|1|A tariff surcharge may be added to this quotation in|Y
01|233497|2|2|the event of a sustained tariff increase on the|Y
01|233497|2|3|importation of this product.  Any surcharge will be|Y
01|233497|2|4|disclosed prior to acceptance of an order.|Y
01|233498|2|1|A tariff surcharge may be added to this quotation in|Y
01|233498|2|2|the event of a sustained tariff increase on the|Y
01|233498|2|3|importation of this product.  Any surcharge will be|Y
01|233498|2|4|disclosed prior to acceptance of an order.|Y
01|233499|8|1|A tariff surcharge may be added to this quotation in|Y
01|233499|8|2|the event of a sustained tariff increase on the|Y
01|233499|8|3|importation of this product.  Any surcharge will be|Y
01|233499|8|4|disclosed prior to acceptance of an order.|Y
01|233501|2|1|A tariff surcharge may be added to this quotation in|Y
01|233501|2|2|the event of a sustained tariff increase on the|Y
01|233501|2|3|importation of this product.  Any surcharge will be|Y
01|233501|2|4|disclosed prior to acceptance of an order.|Y
01|233502|6|1|A tariff surcharge may be added to this quotation in|Y
01|233502|6|2|the event of a sustained tariff increase on the|Y
01|233502|6|3|importation of this product.  Any surcharge will be|Y
01|233502|6|4|disclosed prior to acceptance of an order.|Y
01|233503|6|1|A tariff surcharge may be added to this quotation in|Y
01|233503|6|2|the event of a sustained tariff increase on the|Y
01|233503|6|3|importation of this product.  Any surcharge will be|Y
01|233503|6|4|disclosed prior to acceptance of an order.|Y
01|233504|3|1|A tariff surcharge may be added to this quotation in|Y
01|233504|3|2|the event of a sustained tariff increase on the|Y
01|233504|3|3|importation of this product.  Any surcharge will be|Y
01|233504|3|4|disclosed prior to acceptance of an order.|Y
01|233505|-13|1|A tariff surcharge may be added to this quotation in|Y
01|233505|-13|2|the event of a sustained tariff increase on the|Y
01|233505|-13|3|importation of this product.  Any surcharge will be|Y
01|233505|-13|4|disclosed prior to acceptance of an order.|Y
01|233506|7|1|A tariff surcharge may be added to this quotation in|Y
01|233506|7|2|the event of a sustained tariff increase on the|Y
01|233506|7|3|importation of this product.  Any surcharge will be|Y
01|233506|7|4|disclosed prior to acceptance of an order.|Y
01|233507|16|1|A tariff surcharge may be added to this quotation in|Y
01|233507|16|2|the event of a sustained tariff increase on the|Y
01|233507|16|3|importation of this product.  Any surcharge will be|Y
01|233507|16|4|disclosed prior to acceptance of an order.|Y
01|233508|12|1|A tariff surcharge may be added to this quotation in|Y
01|233508|12|2|the event of a sustained tariff increase on the|Y
01|233508|12|3|importation of this product.  Any surcharge will be|Y
01|233508|12|4|disclosed prior to acceptance of an order.|Y
01|233509|2|1|A tariff surcharge may be added to this quotation in|Y
01|233509|2|2|the event of a sustained tariff increase on the|Y
01|233509|2|3|importation of this product.  Any surcharge will be|Y
01|233509|2|4|disclosed prior to acceptance of an order.|Y
01|233510|2|1|A tariff surcharge may be added to this quotation in|Y
01|233510|2|2|the event of a sustained tariff increase on the|Y
01|233510|2|3|importation of this product.  Any surcharge will be|Y
01|233510|2|4|disclosed prior to acceptance of an order.|Y
01|233511|15|1|A tariff surcharge may be added to this quotation in|Y
01|233511|15|2|the event of a sustained tariff increase on the|Y
01|233511|15|3|importation of this product.  Any surcharge will be|Y
01|233511|15|4|disclosed prior to acceptance of an order.|Y
01|233512|9|1|A tariff surcharge may be added to this quotation in|Y
01|233512|9|2|the event of a sustained tariff increase on the|Y
01|233512|9|3|importation of this product.  Any surcharge will be|Y
01|233512|9|4|disclosed prior to acceptance of an order.|Y
01|233513|4|1|A tariff surcharge may be added to this quotation in|Y
01|233513|4|2|the event of a sustained tariff increase on the|Y
01|233513|4|3|importation of this product.  Any surcharge will be|Y
01|233513|4|4|disclosed prior to acceptance of an order.|Y
01|233514|8|1|A tariff surcharge may be added to this quotation in|Y
01|233514|8|2|the event of a sustained tariff increase on the|Y
01|233514|8|3|importation of this product.  Any surcharge will be|Y
01|233514|8|4|disclosed prior to acceptance of an order.|Y
01|233515|6|1|A tariff surcharge may be added to this quotation in|Y
01|233515|6|2|the event of a sustained tariff increase on the|Y
01|233515|6|3|importation of this product.  Any surcharge will be|Y
01|233515|6|4|disclosed prior to acceptance of an order.|Y
01|233516|1|1|Includes Power and Feedback Cables from Nikken Table|Y
01|233516|1|2|to the machine bulkhead.|Y
01|233516|1|3|Stock - Ships 2 weeks ARO|Y
01|233516|2|1|A tariff surcharge may be added to this quotation in|Y
01|233516|2|2|the event of a sustained tariff increase on the|Y
01|233516|2|3|importation of this product.  Any surcharge will be|Y
01|233516|2|4|disclosed prior to acceptance of an order.|Y
01|233517|2|1|4 PORT ROTARY JOINT FOR THRU SPINDLE PNEUMATICS|Y
01|233517|3|1|ADAPTER PLATE FOR WORKHOLDING|Y
01|233517|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|233517|7|1|A tariff surcharge may be added to this quotation in|Y
01|233517|7|2|the event of a sustained tariff increase on the|Y
01|233517|7|3|importation of this product.  Any surcharge will be|Y
01|233517|7|4|disclosed prior to acceptance of an order.|Y
01|233518|2|1|A tariff surcharge may be added to this quotation in|Y
01|233518|2|2|the event of a sustained tariff increase on the|Y
01|233518|2|3|importation of this product.  Any surcharge will be|Y
01|233518|2|4|disclosed prior to acceptance of an order.|Y
01|233519|2|1|A tariff surcharge may be added to this quotation in|Y
01|233519|2|2|the event of a sustained tariff increase on the|Y
01|233519|2|3|importation of this product.  Any surcharge will be|Y
01|233519|2|4|disclosed prior to acceptance of an order.|Y
01|233520|2|1|A tariff surcharge may be added to this quotation in|Y
01|233520|2|2|the event of a sustained tariff increase on the|Y
01|233520|2|3|importation of this product.  Any surcharge will be|Y
01|233520|2|4|disclosed prior to acceptance of an order.|Y
01|233521|7|1|A tariff surcharge may be added to this quotation in|Y
01|233521|7|2|the event of a sustained tariff increase on the|Y
01|233521|7|3|importation of this product.  Any surcharge will be|Y
01|233521|7|4|disclosed prior to acceptance of an order.|Y
01|233522|6|1|A tariff surcharge may be added to this quotation in|Y
01|233522|6|2|the event of a sustained tariff increase on the|Y
01|233522|6|3|importation of this product.  Any surcharge will be|Y
01|233522|6|4|disclosed prior to acceptance of an order.|Y
01|233523|3|1|A tariff surcharge may be added to this quotation in|Y
01|233523|3|2|the event of a sustained tariff increase on the|Y
01|233523|3|3|importation of this product.  Any surcharge will be|Y
01|233523|3|4|disclosed prior to acceptance of an order.|Y
01|233524|2|1|A tariff surcharge may be added to this quotation in|Y
01|233524|2|2|the event of a sustained tariff increase on the|Y
01|233524|2|3|importation of this product.  Any surcharge will be|Y
01|233524|2|4|disclosed prior to acceptance of an order.|Y
01|233525|2|1|A tariff surcharge may be added to this quotation in|Y
01|233525|2|2|the event of a sustained tariff increase on the|Y
01|233525|2|3|importation of this product.  Any surcharge will be|Y
01|233525|2|4|disclosed prior to acceptance of an order.|Y
01|233526|6|1|A tariff surcharge may be added to this quotation in|Y
01|233526|6|2|the event of a sustained tariff increase on the|Y
01|233526|6|3|importation of this product.  Any surcharge will be|Y
01|233526|6|4|disclosed prior to acceptance of an order.|Y
01|233527|2|1|A tariff surcharge may be added to this quotation in|Y
01|233527|2|2|the event of a sustained tariff increase on the|Y
01|233527|2|3|importation of this product.  Any surcharge will be|Y
01|233527|2|4|disclosed prior to acceptance of an order.|Y
01|233528|3|1|A tariff surcharge may be added to this quotation in|Y
01|233528|3|2|the event of a sustained tariff increase on the|Y
01|233528|3|3|importation of this product.  Any surcharge will be|Y
01|233528|3|4|disclosed prior to acceptance of an order.|Y
01|233529|6|1|A tariff surcharge may be added to this quotation in|Y
01|233529|6|2|the event of a sustained tariff increase on the|Y
01|233529|6|3|importation of this product.  Any surcharge will be|Y
01|233529|6|4|disclosed prior to acceptance of an order.|Y
01|233530|2|1|A tariff surcharge may be added to this quotation in|Y
01|233530|2|2|the event of a sustained tariff increase on the|Y
01|233530|2|3|importation of this product.  Any surcharge will be|Y
01|233530|2|4|disclosed prior to acceptance of an order.|Y
01|233531|1|1|Please Note: Discount reflects our Overstock promotion|Y
01|233531|1|2|and this tooling is non-returnable.|Y
01|233531|2|1|NB5006-1000-4.00 / Taper Plus BT50 End Mill Holder 1|Y
01|233531|2|2|Part Number to be determined.|Y
01|233531|2|3|Quoted at NET price|Y
01|233531|3|1|NB5006-1250-4.00 / Taper Plus BT50 End Mill Holder|Y
01|233531|3|2|1.1/4|Y
01|233531|3|3|Quoted at NET price.|Y
01|233531|4|1|NB5006-1500-4.50 /  Taper Plus BT50 End Mill Holder|Y
01|233531|4|2|1.1/2|Y
01|233531|4|3|Quoted at NET price.|Y
01|233531|13|1|A tariff surcharge may be added to this quotation in|Y
01|233531|13|2|the event of a sustained tariff increase on the|Y
01|233531|13|3|importation of this product.  Any surcharge will be|Y
01|233531|13|4|disclosed prior to acceptance of an order.|Y
01|233534|2|1|A tariff surcharge may be added to this quotation in|Y
01|233534|2|2|the event of a sustained tariff increase on the|Y
01|233534|2|3|importation of this product.  Any surcharge will be|Y
01|233534|2|4|disclosed prior to acceptance of an order.|Y
01|233535|2|1|A tariff surcharge may be added to this quotation in|Y
01|233535|2|2|the event of a sustained tariff increase on the|Y
01|233535|2|3|importation of this product.  Any surcharge will be|Y
01|233535|2|4|disclosed prior to acceptance of an order.|Y
01|233536|2|1|A tariff surcharge may be added to this quotation in|Y
01|233536|2|2|the event of a sustained tariff increase on the|Y
01|233536|2|3|importation of this product.  Any surcharge will be|Y
01|233536|2|4|disclosed prior to acceptance of an order.|Y
01|233537|3|1|A tariff surcharge may be added to this quotation in|Y
01|233537|3|2|the event of a sustained tariff increase on the|Y
01|233537|3|3|importation of this product.  Any surcharge will be|Y
01|233537|3|4|disclosed prior to acceptance of an order.|Y
01|233538|1|1|Quoted at NET price>> Non returnable|Y
01|233538|2|1|Quoted at NET price>> Non returnable|Y
01|233538|3|1|A tariff surcharge may be added to this quotation in|Y
01|233538|3|2|the event of a sustained tariff increase on the|Y
01|233538|3|3|importation of this product.  Any surcharge will be|Y
01|233538|3|4|disclosed prior to acceptance of an order.|Y
01|233539|2|1|A tariff surcharge may be added to this quotation in|Y
01|233539|2|2|the event of a sustained tariff increase on the|Y
01|233539|2|3|importation of this product.  Any surcharge will be|Y
01|233539|2|4|disclosed prior to acceptance of an order.|Y
01|233540|3|1|CURRENTLY TWO (2) IN STOCK.|Y
01|233540|4|1|Lead time is 3~5 days after design is confirmed.|Y
01|233540|8|1|Estimated lead time is end of June 2025.|Y
01|233540|9|1|Lead time is 3~5 days after design is confirmed.|Y
01|233540|12|1|A tariff surcharge may be added to this quotation in|Y
01|233540|12|2|the event of a sustained tariff increase on the|Y
01|233540|12|3|importation of this product.  Any surcharge will be|Y
01|233540|12|4|disclosed prior to acceptance of an order.|Y
01|233541|4|1|A tariff surcharge may be added to this quotation in|Y
01|233541|4|2|the event of a sustained tariff increase on the|Y
01|233541|4|3|importation of this product.  Any surcharge will be|Y
01|233541|4|4|disclosed prior to acceptance of an order.|Y
01|233542|2|1|A tariff surcharge may be added to this quotation in|Y
01|233542|2|2|the event of a sustained tariff increase on the|Y
01|233542|2|3|importation of this product.  Any surcharge will be|Y
01|233542|2|4|disclosed prior to acceptance of an order.|Y
01|233543|1|1|NC5006-20-3.00 Taper Plus CAT50 End Mill Holder 20mm|Y
01|233543|1|2|Quoted at NET price and this tool is non returnable.|Y
01|233543|1|3|Minimum order of 10 holders is required.|Y
01|233543|2|1|NC5006-25-4.00 Taper Plus CAT50 End Mill Holder 25mm|Y
01|233543|2|2|Quoted at NET price and this tool is non returnable.|Y
01|233543|2|3|Minimum order of 10 holders is required.|Y
01|233543|3|1|Quoted at NET price and this tool is non returnable.|Y
01|233543|3|2|Minimum order of 10 holders is required.|Y
01|233543|5|1|A tariff surcharge may be added to this quotation in|Y
01|233543|5|2|the event of a sustained tariff increase on the|Y
01|233543|5|3|importation of this product.  Any surcharge will be|Y
01|233543|5|4|disclosed prior to acceptance of an order.|Y
01|233544|2|1|A tariff surcharge may be added to this quotation in|Y
01|233544|2|2|the event of a sustained tariff increase on the|Y
01|233544|2|3|importation of this product.  Any surcharge will be|Y
01|233544|2|4|disclosed prior to acceptance of an order.|Y
01|233545|3|1|A tariff surcharge may be added to this quotation in|Y
01|233545|3|2|the event of a sustained tariff increase on the|Y
01|233545|3|3|importation of this product.  Any surcharge will be|Y
01|233545|3|4|disclosed prior to acceptance of an order.|Y
01|233547|1|1|Service call for E346+ s/n:101216 101217 & 101217 &|Y
01|233547|1|2|E46LA s/n:TBD   This is a time based estimate.|Y
01|233547|1|3|Any parts that would be required would be additional.|Y
01|233547|3|1|A tariff surcharge may be added to this quotation in|Y
01|233547|3|2|the event of a sustained tariff increase on the|Y
01|233547|3|3|importation of this product.  Any surcharge will be|Y
01|233547|3|4|disclosed prior to acceptance of an order.|Y
01|233548|2|1|A tariff surcharge may be added to this quotation in|Y
01|233548|2|2|the event of a sustained tariff increase on the|Y
01|233548|2|3|importation of this product.  Any surcharge will be|Y
01|233548|2|4|disclosed prior to acceptance of an order.|Y
01|233549|10|1|A tariff surcharge may be added to this quotation in|Y
01|233549|10|2|the event of a sustained tariff increase on the|Y
01|233549|10|3|importation of this product.  Any surcharge will be|Y
01|233549|10|4|disclosed prior to acceptance of an order.|Y
01|233550|3|1|A tariff surcharge may be added to this quotation in|Y
01|233550|3|2|the event of a sustained tariff increase on the|Y
01|233550|3|3|importation of this product.  Any surcharge will be|Y
01|233550|3|4|disclosed prior to acceptance of an order.|Y
01|233551|1|1|Checkup x3 5AX-2MT-130-170BAHFA-M|Y
01|233551|1|2|Weekend Charge (Sunday)|Y
01|233551|3|1|Travel expenses|Y
01|233551|4|1|A tariff surcharge may be added to this quotation in|Y
01|233551|4|2|the event of a sustained tariff increase on the|Y
01|233551|4|3|importation of this product.  Any surcharge will be|Y
01|233551|4|4|disclosed prior to acceptance of an order.|Y
01|233552|1|1|RGA#LVR-61940/|Y
01|233552|1|2|Repair of OKU-L370MW-DB s/n: Unknown|Y
01|233552|1|3|(Alps#OKU-L370MW-DB)|Y
01|233552|2|1|Bearings seals o-rings gears and spindle to be|Y
01|233552|2|2|replaced.|Y
01|233552|3|1|A tariff surcharge may be added to this quotation in|Y
01|233552|3|2|the event of a sustained tariff increase on the|Y
01|233552|3|3|importation of this product.  Any surcharge will be|Y
01|233552|3|4|disclosed prior to acceptance of an order.|Y
01|233554|4|1|A tariff surcharge may be added to this quotation in|Y
01|233554|4|2|the event of a sustained tariff increase on the|Y
01|233554|4|3|importation of this product.  Any surcharge will be|Y
01|233554|4|4|disclosed prior to acceptance of an order.|Y
01|233555|2|1|A tariff surcharge may be added to this quotation in|Y
01|233555|2|2|the event of a sustained tariff increase on the|Y
01|233555|2|3|importation of this product.  Any surcharge will be|Y
01|233555|2|4|disclosed prior to acceptance of an order.|Y
01|233556|6|1|A tariff surcharge may be added to this quotation in|Y
01|233556|6|2|the event of a sustained tariff increase on the|Y
01|233556|6|3|importation of this product.  Any surcharge will be|Y
01|233556|6|4|disclosed prior to acceptance of an order.|Y
01|233557|3|1|A tariff surcharge may be added to this quotation in|Y
01|233557|3|2|the event of a sustained tariff increase on the|Y
01|233557|3|3|importation of this product.  Any surcharge will be|Y
01|233557|3|4|disclosed prior to acceptance of an order.|Y
01|233558|13|1|A tariff surcharge may be added to this quotation in|Y
01|233558|13|2|the event of a sustained tariff increase on the|Y
01|233558|13|3|importation of this product.  Any surcharge will be|Y
01|233558|13|4|disclosed prior to acceptance of an order.|Y
01|233559|9|1|A tariff surcharge may be added to this quotation in|Y
01|233559|9|2|the event of a sustained tariff increase on the|Y
01|233559|9|3|importation of this product.  Any surcharge will be|Y
01|233559|9|4|disclosed prior to acceptance of an order.|Y
01|233561|2|1|A tariff surcharge may be added to this quotation in|Y
01|233561|2|2|the event of a sustained tariff increase on the|Y
01|233561|2|3|importation of this product.  Any surcharge will be|Y
01|233561|2|4|disclosed prior to acceptance of an order.|Y
01|233562|2|1|A tariff surcharge may be added to this quotation in|Y
01|233562|2|2|the event of a sustained tariff increase on the|Y
01|233562|2|3|importation of this product.  Any surcharge will be|Y
01|233562|2|4|disclosed prior to acceptance of an order.|Y
01|233563|2|1|A tariff surcharge may be added to this quotation in|Y
01|233563|2|2|the event of a sustained tariff increase on the|Y
01|233563|2|3|importation of this product.  Any surcharge will be|Y
01|233563|2|4|disclosed prior to acceptance of an order.|Y
01|233564|3|1|A tariff surcharge may be added to this quotation in|Y
01|233564|3|2|the event of a sustained tariff increase on the|Y
01|233564|3|3|importation of this product.  Any surcharge will be|Y
01|233564|3|4|disclosed prior to acceptance of an order.|Y
01|233565|2|1|A tariff surcharge may be added to this quotation in|Y
01|233565|2|2|the event of a sustained tariff increase on the|Y
01|233565|2|3|importation of this product.  Any surcharge will be|Y
01|233565|2|4|disclosed prior to acceptance of an order.|Y
01|233566|2|1|A tariff surcharge may be added to this quotation in|Y
01|233566|2|2|the event of a sustained tariff increase on the|Y
01|233566|2|3|importation of this product.  Any surcharge will be|Y
01|233566|2|4|disclosed prior to acceptance of an order.|Y
01|233567|6|1|A tariff surcharge may be added to this quotation in|Y
01|233567|6|2|the event of a sustained tariff increase on the|Y
01|233567|6|3|importation of this product.  Any surcharge will be|Y
01|233567|6|4|disclosed prior to acceptance of an order.|Y
01|233568|2|1|A tariff surcharge may be added to this quotation in|Y
01|233568|2|2|the event of a sustained tariff increase on the|Y
01|233568|2|3|importation of this product.  Any surcharge will be|Y
01|233568|2|4|disclosed prior to acceptance of an order.|Y
01|233569|3|1|A tariff surcharge may be added to this quotation in|Y
01|233569|3|2|the event of a sustained tariff increase on the|Y
01|233569|3|3|importation of this product.  Any surcharge will be|Y
01|233569|3|4|disclosed prior to acceptance of an order.|Y
01|233570|3|1|A tariff surcharge may be added to this quotation in|Y
01|233570|3|2|the event of a sustained tariff increase on the|Y
01|233570|3|3|importation of this product.  Any surcharge will be|Y
01|233570|3|4|disclosed prior to acceptance of an order.|Y
01|233571|1|1|For DNM4500 Oi-MF control|Y
01|233571|4|1|For Mynx 6500 Fanuc Oi-MF|Y
01|233571|8|1|Required for each installation.|Y
01|233571|8|2|Discount available if both installs occur on|Y
01|233571|8|3|same trip/visit|Y
01|233571|9|1|A tariff surcharge may be added to this quotation in|Y
01|233571|9|2|the event of a sustained tariff increase on the|Y
01|233571|9|3|importation of this product.  Any surcharge will be|Y
01|233571|9|4|disclosed prior to acceptance of an order.|Y
01|233572|2|1|A tariff surcharge may be added to this quotation in|Y
01|233572|2|2|the event of a sustained tariff increase on the|Y
01|233572|2|3|importation of this product.  Any surcharge will be|Y
01|233572|2|4|disclosed prior to acceptance of an order.|Y
01|233573|32|1|A tariff surcharge may be added to this quotation in|Y
01|233573|32|2|the event of a sustained tariff increase on the|Y
01|233573|32|3|importation of this product.  Any surcharge will be|Y
01|233573|32|4|disclosed prior to acceptance of an order.|Y
01|233574|2|1|A tariff surcharge may be added to this quotation in|Y
01|233574|2|2|the event of a sustained tariff increase on the|Y
01|233574|2|3|importation of this product.  Any surcharge will be|Y
01|233574|2|4|disclosed prior to acceptance of an order.|Y
01|233575|4|1|A tariff surcharge may be added to this quotation in|Y
01|233575|4|2|the event of a sustained tariff increase on the|Y
01|233575|4|3|importation of this product.  Any surcharge will be|Y
01|233575|4|4|disclosed prior to acceptance of an order.|Y
01|233576|1|1|Final Sale|Y
01|233576|4|1|A tariff surcharge may be added to this quotation in|Y
01|233576|4|2|the event of a sustained tariff increase on the|Y
01|233576|4|3|importation of this product.  Any surcharge will be|Y
01|233576|4|4|disclosed prior to acceptance of an order.|Y
01|233577|4|1|A tariff surcharge may be added to this quotation in|Y
01|233577|4|2|the event of a sustained tariff increase on the|Y
01|233577|4|3|importation of this product.  Any surcharge will be|Y
01|233577|4|4|disclosed prior to acceptance of an order.|Y
01|233578|2|1|A tariff surcharge may be added to this quotation in|Y
01|233578|2|2|the event of a sustained tariff increase on the|Y
01|233578|2|3|importation of this product.  Any surcharge will be|Y
01|233578|2|4|disclosed prior to acceptance of an order.|Y
01|233579|29|1|A tariff surcharge may be added to this quotation in|Y
01|233579|29|2|the event of a sustained tariff increase on the|Y
01|233579|29|3|importation of this product.  Any surcharge will be|Y
01|233579|29|4|disclosed prior to acceptance of an order.|Y
01|233580|2|1|A tariff surcharge may be added to this quotation in|Y
01|233580|2|2|the event of a sustained tariff increase on the|Y
01|233580|2|3|importation of this product.  Any surcharge will be|Y
01|233580|2|4|disclosed prior to acceptance of an order.|Y
01|233581|2|1|A tariff surcharge may be added to this quotation in|Y
01|233581|2|2|the event of a sustained tariff increase on the|Y
01|233581|2|3|importation of this product.  Any surcharge will be|Y
01|233581|2|4|disclosed prior to acceptance of an order.|Y
01|233582|1|1|Delivery:|Y
01|233582|1|2|10 pcs 1 Week Remainder 7/17|Y
01|233582|3|1|SK20-6P|Y
01|233582|3|2|SK20 Slim Chuck Collet 6.0-5.5mm Precision|Y
01|233582|5|1|SK20-12P|Y
01|233582|5|2|SK20 Slim Chuck Collet 12.0-11.5mm Precision|Y
01|233582|7|1|SK20-11P|Y
01|233582|7|2|SK20 Slim Chuck Collet 11-10.5mm Precision|Y
01|233582|8|1|SK20-7P|Y
01|233582|8|2|SK20 Slim Chuck Collet 7.0-6.5mm Precision|Y
01|233582|9|1|SKJ25-7|Y
01|233582|9|2|SK20/SK25 Coolant Cap 7.0mm Jet Slots|Y
01|233582|10|1|SK20-8P|Y
01|233582|10|2|SK20/SK25 Coolant Cap 7.0mm Jet Slots|Y
01|233582|11|1|SK20-8P|Y
01|233582|11|2|SK20 Slim Chuck Collet 8.0-7.5mm Precision|Y
01|233582|12|1|SK20-13P|Y
01|233582|12|2|SK20 Slim Chuck Collet 13.0-12.5mm Precision|Y
01|233582|13|1|SKJ25-13|Y
01|233582|13|2|SK20/SK25 Coolant Cap 13mm Jet Slots|Y
01|233582|14|1|SK20-9P|Y
01|233582|14|2|SK20 Slim Chuck Collet 9.0-8.5mm Precision|Y
01|233582|15|1|SKJ25-9|Y
01|233582|15|2|SK20/SK25 Coolant Cap 9mm Jet Slotsecision|Y
01|233582|20|1|SK20-5P|Y
01|233582|20|2|SK20 Slim Chuck Collet 5.0-4.5mm Precision|Y
01|233582|21|1|SKJ25-5|Y
01|233582|21|2|SK20/SK25 Coolant Cap 5.0mm Jet Slots|Y
01|233582|35|1|CCK3/4-5|Y
01|233582|35|2|Straight Coolant Collet/Sleeve OD 3/4 ID 5mm|Y
01|233582|36|1|CKFN20(3/4)-5|Y
01|233582|36|2|CCK Coolant Jet Slot Nut/Cap OD20mm(3/4) ID5mm|Y
01|233582|40|1|A tariff surcharge may be added to this quotation in|Y
01|233582|40|2|the event of a sustained tariff increase on the|Y
01|233582|40|3|importation of this product.  Any surcharge will be|Y
01|233582|40|4|disclosed prior to acceptance of an order.|Y
01|233583|2|1|A tariff surcharge may be added to this quotation in|Y
01|233583|2|2|the event of a sustained tariff increase on the|Y
01|233583|2|3|importation of this product.  Any surcharge will be|Y
01|233583|2|4|disclosed prior to acceptance of an order.|Y
01|233584|2|1|A tariff surcharge may be added to this quotation in|Y
01|233584|2|2|the event of a sustained tariff increase on the|Y
01|233584|2|3|importation of this product.  Any surcharge will be|Y
01|233584|2|4|disclosed prior to acceptance of an order.|Y
01|233585|2|1|A tariff surcharge may be added to this quotation in|Y
01|233585|2|2|the event of a sustained tariff increase on the|Y
01|233585|2|3|importation of this product.  Any surcharge will be|Y
01|233585|2|4|disclosed prior to acceptance of an order.|Y
01|233586|2|1|A tariff surcharge may be added to this quotation in|Y
01|233586|2|2|the event of a sustained tariff increase on the|Y
01|233586|2|3|importation of this product.  Any surcharge will be|Y
01|233586|2|4|disclosed prior to acceptance of an order.|Y
01|233587|2|1|A tariff surcharge may be added to this quotation in|Y
01|233587|2|2|the event of a sustained tariff increase on the|Y
01|233587|2|3|importation of this product.  Any surcharge will be|Y
01|233587|2|4|disclosed prior to acceptance of an order.|Y
01|233588|5|1|A tariff surcharge may be added to this quotation in|Y
01|233588|5|2|the event of a sustained tariff increase on the|Y
01|233588|5|3|importation of this product.  Any surcharge will be|Y
01|233588|5|4|disclosed prior to acceptance of an order.|Y
01|233589|2|1|A tariff surcharge may be added to this quotation in|Y
01|233589|2|2|the event of a sustained tariff increase on the|Y
01|233589|2|3|importation of this product.  Any surcharge will be|Y
01|233589|2|4|disclosed prior to acceptance of an order.|Y
01|233590|2|1|A tariff surcharge may be added to this quotation in|Y
01|233590|2|2|the event of a sustained tariff increase on the|Y
01|233590|2|3|importation of this product.  Any surcharge will be|Y
01|233590|2|4|disclosed prior to acceptance of an order.|Y
01|233591|2|1|A tariff surcharge may be added to this quotation in|Y
01|233591|2|2|the event of a sustained tariff increase on the|Y
01|233591|2|3|importation of this product.  Any surcharge will be|Y
01|233591|2|4|disclosed prior to acceptance of an order.|Y
01|233592|2|1|A tariff surcharge may be added to this quotation in|Y
01|233592|2|2|the event of a sustained tariff increase on the|Y
01|233592|2|3|importation of this product.  Any surcharge will be|Y
01|233592|2|4|disclosed prior to acceptance of an order.|Y
01|233594|2|1|A tariff surcharge may be added to this quotation in|Y
01|233594|2|2|the event of a sustained tariff increase on the|Y
01|233594|2|3|importation of this product.  Any surcharge will be|Y
01|233594|2|4|disclosed prior to acceptance of an order.|Y
01|233595|11|1|Special non-standard stock can't be cancelled/returned|Y
01|233595|13|1|Special non-standard stock can't be cancelled/returned|Y
01|233595|14|1|A tariff surcharge may be added to this quotation in|Y
01|233595|14|2|the event of a sustained tariff increase on the|Y
01|233595|14|3|importation of this product.  Any surcharge will be|Y
01|233595|14|4|disclosed prior to acceptance of an order.|Y
01|233596|2|1|A tariff surcharge may be added to this quotation in|Y
01|233596|2|2|the event of a sustained tariff increase on the|Y
01|233596|2|3|importation of this product.  Any surcharge will be|Y
01|233596|2|4|disclosed prior to acceptance of an order.|Y
01|233597|2|1|A tariff surcharge may be added to this quotation in|Y
01|233597|2|2|the event of a sustained tariff increase on the|Y
01|233597|2|3|importation of this product.  Any surcharge will be|Y
01|233597|2|4|disclosed prior to acceptance of an order.|Y
01|233598|4|1|E11-EXT-750 with extended one-side flat modified by LN|Y
01|233598|4|2|**Non-cancellable non-returnable**|Y
01|233598|5|1|E11-EXT-750 with extended one-side flat modified|Y
01|233598|5|2|by LN. NET service charge.|Y
01|233598|7|1|A tariff surcharge may be added to this quotation in|Y
01|233598|7|2|the event of a sustained tariff increase on the|Y
01|233598|7|3|importation of this product.  Any surcharge will be|Y
01|233598|7|4|disclosed prior to acceptance of an order.|Y
01|233599|1|1|Additional 20% Overstock discount added to standard|Y
01|233599|1|2|35% discount. Final Sale.|Y
01|233599|4|1|A tariff surcharge may be added to this quotation in|Y
01|233599|4|2|the event of a sustained tariff increase on the|Y
01|233599|4|3|importation of this product.  Any surcharge will be|Y
01|233599|4|4|disclosed prior to acceptance of an order.|Y
01|233601|10|1|A tariff surcharge may be added to this quotation in|Y
01|233601|10|2|the event of a sustained tariff increase on the|Y
01|233601|10|3|importation of this product.  Any surcharge will be|Y
01|233601|10|4|disclosed prior to acceptance of an order.|Y
01|233602|3|1|A tariff surcharge may be added to this quotation in|Y
01|233602|3|2|the event of a sustained tariff increase on the|Y
01|233602|3|3|importation of this product.  Any surcharge will be|Y
01|233602|3|4|disclosed prior to acceptance of an order.|Y
01|233603|4|1|A tariff surcharge may be added to this quotation in|Y
01|233603|4|2|the event of a sustained tariff increase on the|Y
01|233603|4|3|importation of this product.  Any surcharge will be|Y
01|233603|4|4|disclosed prior to acceptance of an order.|Y
01|233604|4|1|A tariff surcharge may be added to this quotation in|Y
01|233604|4|2|the event of a sustained tariff increase on the|Y
01|233604|4|3|importation of this product.  Any surcharge will be|Y
01|233604|4|4|disclosed prior to acceptance of an order.|Y
01|233605|3|1|A tariff surcharge may be added to this quotation in|Y
01|233605|3|2|the event of a sustained tariff increase on the|Y
01|233605|3|3|importation of this product.  Any surcharge will be|Y
01|233605|3|4|disclosed prior to acceptance of an order.|Y
01|233606|2|1|A tariff surcharge may be added to this quotation in|Y
01|233606|2|2|the event of a sustained tariff increase on the|Y
01|233606|2|3|importation of this product.  Any surcharge will be|Y
01|233606|2|4|disclosed prior to acceptance of an order.|Y
01|233607|6|1|A tariff surcharge may be added to this quotation in|Y
01|233607|6|2|the event of a sustained tariff increase on the|Y
01|233607|6|3|importation of this product.  Any surcharge will be|Y
01|233607|6|4|disclosed prior to acceptance of an order.|Y
01|233608|2|1|A tariff surcharge may be added to this quotation in|Y
01|233608|2|2|the event of a sustained tariff increase on the|Y
01|233608|2|3|importation of this product.  Any surcharge will be|Y
01|233608|2|4|disclosed prior to acceptance of an order.|Y
01|233609|2|1|A tariff surcharge may be added to this quotation in|Y
01|233609|2|2|the event of a sustained tariff increase on the|Y
01|233609|2|3|importation of this product.  Any surcharge will be|Y
01|233609|2|4|disclosed prior to acceptance of an order.|Y
01|233610|-13|1|A tariff surcharge may be added to this quotation in|Y
01|233610|-13|2|the event of a sustained tariff increase on the|Y
01|233610|-13|3|importation of this product.  Any surcharge will be|Y
01|233610|-13|4|disclosed prior to acceptance of an order.|Y
01|233611|3|1|A tariff surcharge may be added to this quotation in|Y
01|233611|3|2|the event of a sustained tariff increase on the|Y
01|233611|3|3|importation of this product.  Any surcharge will be|Y
01|233611|3|4|disclosed prior to acceptance of an order.|Y
01|233612|4|1|A tariff surcharge may be added to this quotation in|Y
01|233612|4|2|the event of a sustained tariff increase on the|Y
01|233612|4|3|importation of this product.  Any surcharge will be|Y
01|233612|4|4|disclosed prior to acceptance of an order.|Y
01|233613|2|1|A tariff surcharge may be added to this quotation in|Y
01|233613|2|2|the event of a sustained tariff increase on the|Y
01|233613|2|3|importation of this product.  Any surcharge will be|Y
01|233613|2|4|disclosed prior to acceptance of an order.|Y
01|233614|4|1|A tariff surcharge may be added to this quotation in|Y
01|233614|4|2|the event of a sustained tariff increase on the|Y
01|233614|4|3|importation of this product.  Any surcharge will be|Y
01|233614|4|4|disclosed prior to acceptance of an order.|Y
01|233615|4|1|A tariff surcharge may be added to this quotation in|Y
01|233615|4|2|the event of a sustained tariff increase on the|Y
01|233615|4|3|importation of this product.  Any surcharge will be|Y
01|233615|4|4|disclosed prior to acceptance of an order.|Y
01|233616|4|1|A tariff surcharge may be added to this quotation in|Y
01|233616|4|2|the event of a sustained tariff increase on the|Y
01|233616|4|3|importation of this product.  Any surcharge will be|Y
01|233616|4|4|disclosed prior to acceptance of an order.|Y
01|233617|2|1|A tariff surcharge may be added to this quotation in|Y
01|233617|2|2|the event of a sustained tariff increase on the|Y
01|233617|2|3|importation of this product.  Any surcharge will be|Y
01|233617|2|4|disclosed prior to acceptance of an order.|Y
01|233618|1|1|FOR M660V|Y
01|233618|2|1|A tariff surcharge may be added to this quotation in|Y
01|233618|2|2|the event of a sustained tariff increase on the|Y
01|233618|2|3|importation of this product.  Any surcharge will be|Y
01|233618|2|4|disclosed prior to acceptance of an order.|Y
01|233619|4|1|A tariff surcharge may be added to this quotation in|Y
01|233619|4|2|the event of a sustained tariff increase on the|Y
01|233619|4|3|importation of this product.  Any surcharge will be|Y
01|233619|4|4|disclosed prior to acceptance of an order.|Y
01|233620|1|1|Part Number: TBD|Y
01|233620|1|2|NBT30 DualContact Shrink-Fit 5/16 Mold Type 105mm G/L|Y
01|233620|1|3|OD 13.5mm|Y
01|233620|1|4|Quantity Breaks: (*NET Price)|Y
01|233620|1|5|2-4 pcs: $793.00/EA|Y
01|233620|1|6|5-9 pcs: $507.00/EA|Y
01|233620|1|7|10+ pcs: $338.00/EA|Y
01|233620|1|8|*Lead time given as ADA - After Signed Drawing Approval|Y
01|233620|1|9|Please allow 1-2 weeks for creation of approval dwg.|Y
01|233620|2|1|A tariff surcharge may be added to this quotation in|Y
01|233620|2|2|the event of a sustained tariff increase on the|Y
01|233620|2|3|importation of this product.  Any surcharge will be|Y
01|233620|2|4|disclosed prior to acceptance of an order.|Y
01|233621|1|1|Please note this is considered non-standard stock.|Y
01|233621|1|2|Once PO/order has been placed these can't be cancelled|Y
01|233621|1|3|or returned.|Y
01|233621|6|1|A tariff surcharge may be added to this quotation in|Y
01|233621|6|2|the event of a sustained tariff increase on the|Y
01|233621|6|3|importation of this product.  Any surcharge will be|Y
01|233621|6|4|disclosed prior to acceptance of an order.|Y
01|233622|2|1|A tariff surcharge may be added to this quotation in|Y
01|233622|2|2|the event of a sustained tariff increase on the|Y
01|233622|2|3|importation of this product.  Any surcharge will be|Y
01|233622|2|4|disclosed prior to acceptance of an order.|Y
01|233623|4|1|A tariff surcharge may be added to this quotation in|Y
01|233623|4|2|the event of a sustained tariff increase on the|Y
01|233623|4|3|importation of this product.  Any surcharge will be|Y
01|233623|4|4|disclosed prior to acceptance of an order.|Y
01|233624|1|1|RGA#TOR-61947/|Y
01|233624|1|2|Repair of PF-2|Y
01|233624|4|1|Calibration service included|Y
01|233624|5|1|A tariff surcharge may be added to this quotation in|Y
01|233624|5|2|the event of a sustained tariff increase on the|Y
01|233624|5|3|importation of this product.  Any surcharge will be|Y
01|233624|5|4|disclosed prior to acceptance of an order.|Y
01|233625|2|1|A tariff surcharge may be added to this quotation in|Y
01|233625|2|2|the event of a sustained tariff increase on the|Y
01|233625|2|3|importation of this product.  Any surcharge will be|Y
01|233625|2|4|disclosed prior to acceptance of an order.|Y
01|233626|2|1|A tariff surcharge may be added to this quotation in|Y
01|233626|2|2|the event of a sustained tariff increase on the|Y
01|233626|2|3|importation of this product.  Any surcharge will be|Y
01|233626|2|4|disclosed prior to acceptance of an order.|Y
01|233627|2|1|A tariff surcharge may be added to this quotation in|Y
01|233627|2|2|the event of a sustained tariff increase on the|Y
01|233627|2|3|importation of this product.  Any surcharge will be|Y
01|233627|2|4|disclosed prior to acceptance of an order.|Y
01|233628|2|1|A tariff surcharge may be added to this quotation in|Y
01|233628|2|2|the event of a sustained tariff increase on the|Y
01|233628|2|3|importation of this product.  Any surcharge will be|Y
01|233628|2|4|disclosed prior to acceptance of an order.|Y
01|233629|3|1|A tariff surcharge may be added to this quotation in|Y
01|233629|3|2|the event of a sustained tariff increase on the|Y
01|233629|3|3|importation of this product.  Any surcharge will be|Y
01|233629|3|4|disclosed prior to acceptance of an order.|Y
01|233630|2|1|Includes dual axis drive unit short bar fiber optic|Y
01|233630|2|2|cable communications cablesbulkhead cables external|Y
01|233630|2|3|cables.|Y
01|233630|3|1|Includes: 2-3 days service time and travel.|Y
01|233630|4|1|A tariff surcharge may be added to this quotation in|Y
01|233630|4|2|the event of a sustained tariff increase on the|Y
01|233630|4|3|importation of this product.  Any surcharge will be|Y
01|233630|4|4|disclosed prior to acceptance of an order.|Y
01|233631|1|1|RGA#TAR-61856|Y
01|233631|1|2|NCT200LSA-BR2-QT/R650|Y
01|233631|27|1|A tariff surcharge may be added to this quotation in|Y
01|233631|27|2|the event of a sustained tariff increase on the|Y
01|233631|27|3|importation of this product.  Any surcharge will be|Y
01|233631|27|4|disclosed prior to acceptance of an order.|Y
01|233632|4|1|A tariff surcharge may be added to this quotation in|Y
01|233632|4|2|the event of a sustained tariff increase on the|Y
01|233632|4|3|importation of this product.  Any surcharge will be|Y
01|233632|4|4|disclosed prior to acceptance of an order.|Y
01|233633|12|1|A tariff surcharge may be added to this quotation in|Y
01|233633|12|2|the event of a sustained tariff increase on the|Y
01|233633|12|3|importation of this product.  Any surcharge will be|Y
01|233633|12|4|disclosed prior to acceptance of an order.|Y
01|233635|3|1|A tariff surcharge may be added to this quotation in|Y
01|233635|3|2|the event of a sustained tariff increase on the|Y
01|233635|3|3|importation of this product.  Any surcharge will be|Y
01|233635|3|4|disclosed prior to acceptance of an order.|Y
01|233636|5|1|Final Part# TBD **NET Price**  MOQ 5 pieces|Y
01|233636|5|2|NCAT40 DualContact Shrink Fit Holder 7/16 CoolantPorts|Y
01|233636|5|3|3.15 Gauge Length|Y
01|233636|5|4|.|Y
01|233636|5|5|DELIVERY: Please allow 1-2 Wks design time. Once|Y
01|233636|5|6|approval drawing is signed by customer MFG + Shipping|Y
01|233636|5|7|is 11-12 Wks|Y
01|233636|5|8|.|Y
01|233636|5|9|**Custom Special cannot be cancelled or returned**|Y
01|233637|2|1|A tariff surcharge may be added to this quotation in|Y
01|233637|2|2|the event of a sustained tariff increase on the|Y
01|233637|2|3|importation of this product.  Any surcharge will be|Y
01|233637|2|4|disclosed prior to acceptance of an order.|Y
01|233638|2|1|A tariff surcharge may be added to this quotation in|Y
01|233638|2|2|the event of a sustained tariff increase on the|Y
01|233638|2|3|importation of this product.  Any surcharge will be|Y
01|233638|2|4|disclosed prior to acceptance of an order.|Y
01|233639|2|1|A tariff surcharge may be added to this quotation in|Y
01|233639|2|2|the event of a sustained tariff increase on the|Y
01|233639|2|3|importation of this product.  Any surcharge will be|Y
01|233639|2|4|disclosed prior to acceptance of an order.|Y
01|233640|3|1|A tariff surcharge may be added to this quotation in|Y
01|233640|3|2|the event of a sustained tariff increase on the|Y
01|233640|3|3|importation of this product.  Any surcharge will be|Y
01|233640|3|4|disclosed prior to acceptance of an order.|Y
01|233641|20|1|A tariff surcharge may be added to this quotation in|Y
01|233641|20|2|the event of a sustained tariff increase on the|Y
01|233641|20|3|importation of this product.  Any surcharge will be|Y
01|233641|20|4|disclosed prior to acceptance of an order.|Y
01|233642|3|1|A tariff surcharge may be added to this quotation in|Y
01|233642|3|2|the event of a sustained tariff increase on the|Y
01|233642|3|3|importation of this product.  Any surcharge will be|Y
01|233642|3|4|disclosed prior to acceptance of an order.|Y
01|233643|1|1|Please note these are quoted at special net price.|Y
01|233643|1|2|Once PO has been issued these items cannot be|Y
01|233643|1|3|cancelled or returned.|Y
01|233644|3|1|A tariff surcharge may be added to this quotation in|Y
01|233644|3|2|the event of a sustained tariff increase on the|Y
01|233644|3|3|importation of this product.  Any surcharge will be|Y
01|233644|3|4|disclosed prior to acceptance of an order.|Y
01|233645|4|1|A tariff surcharge may be added to this quotation in|Y
01|233645|4|2|the event of a sustained tariff increase on the|Y
01|233645|4|3|importation of this product.  Any surcharge will be|Y
01|233645|4|4|disclosed prior to acceptance of an order.|Y
01|233646|10|1|A tariff surcharge may be added to this quotation in|Y
01|233646|10|2|the event of a sustained tariff increase on the|Y
01|233646|10|3|importation of this product.  Any surcharge will be|Y
01|233646|10|4|disclosed prior to acceptance of an order.|Y
01|233647|10|1|INSTALLATION ON FANUC CONTROL LEADWELL MACHINE|Y
01|233647|11|1|A tariff surcharge may be added to this quotation in|Y
01|233647|11|2|the event of a sustained tariff increase on the|Y
01|233647|11|3|importation of this product.  Any surcharge will be|Y
01|233647|11|4|disclosed prior to acceptance of an order.|Y
01|233648|1|1|Ship 1-2 weeks after reciept order|Y
01|233648|2|1|A tariff surcharge may be added to this quotation in|Y
01|233648|2|2|the event of a sustained tariff increase on the|Y
01|233648|2|3|importation of this product.  Any surcharge will be|Y
01|233648|2|4|disclosed prior to acceptance of an order.|Y
01|233649|3|1|A tariff surcharge may be added to this quotation in|Y
01|233649|3|2|the event of a sustained tariff increase on the|Y
01|233649|3|3|importation of this product.  Any surcharge will be|Y
01|233649|3|4|disclosed prior to acceptance of an order.|Y
01|233650|2|1|A tariff surcharge may be added to this quotation in|Y
01|233650|2|2|the event of a sustained tariff increase on the|Y
01|233650|2|3|importation of this product.  Any surcharge will be|Y
01|233650|2|4|disclosed prior to acceptance of an order.|Y
01|233652|2|1|A tariff surcharge may be added to this quotation in|Y
01|233652|2|2|the event of a sustained tariff increase on the|Y
01|233652|2|3|importation of this product.  Any surcharge will be|Y
01|233652|2|4|disclosed prior to acceptance of an order.|Y
01|233653|2|1|A tariff surcharge may be added to this quotation in|Y
01|233653|2|2|the event of a sustained tariff increase on the|Y
01|233653|2|3|importation of this product.  Any surcharge will be|Y
01|233653|2|4|disclosed prior to acceptance of an order.|Y
01|233654|2|1|A tariff surcharge may be added to this quotation in|Y
01|233654|2|2|the event of a sustained tariff increase on the|Y
01|233654|2|3|importation of this product.  Any surcharge will be|Y
01|233654|2|4|disclosed prior to acceptance of an order.|Y
01|233655|2|1|A tariff surcharge may be added to this quotation in|Y
01|233655|2|2|the event of a sustained tariff increase on the|Y
01|233655|2|3|importation of this product.  Any surcharge will be|Y
01|233655|2|4|disclosed prior to acceptance of an order.|Y
01|233656|2|1|A tariff surcharge may be added to this quotation in|Y
01|233656|2|2|the event of a sustained tariff increase on the|Y
01|233656|2|3|importation of this product.  Any surcharge will be|Y
01|233656|2|4|disclosed prior to acceptance of an order.|Y
01|233657|2|1|A tariff surcharge may be added to this quotation in|Y
01|233657|2|2|the event of a sustained tariff increase on the|Y
01|233657|2|3|importation of this product.  Any surcharge will be|Y
01|233657|2|4|disclosed prior to acceptance of an order.|Y
01|233658|3|1|A tariff surcharge may be added to this quotation in|Y
01|233658|3|2|the event of a sustained tariff increase on the|Y
01|233658|3|3|importation of this product.  Any surcharge will be|Y
01|233658|3|4|disclosed prior to acceptance of an order.|Y
01|233659|3|1|A tariff surcharge may be added to this quotation in|Y
01|233659|3|2|the event of a sustained tariff increase on the|Y
01|233659|3|3|importation of this product.  Any surcharge will be|Y
01|233659|3|4|disclosed prior to acceptance of an order.|Y
01|233660|2|1|A tariff surcharge may be added to this quotation in|Y
01|233660|2|2|the event of a sustained tariff increase on the|Y
01|233660|2|3|importation of this product.  Any surcharge will be|Y
01|233660|2|4|disclosed prior to acceptance of an order.|Y
01|233661|1|1|B5001-1000-7.50CP|Y
01|233661|1|2|Net price for Abremaq|Y
01|233661|2|1|A tariff surcharge may be added to this quotation in|Y
01|233661|2|2|the event of a sustained tariff increase on the|Y
01|233661|2|3|importation of this product.  Any surcharge will be|Y
01|233661|2|4|disclosed prior to acceptance of an order.|Y
01|233662|2|1|A tariff surcharge may be added to this quotation in|Y
01|233662|2|2|the event of a sustained tariff increase on the|Y
01|233662|2|3|importation of this product.  Any surcharge will be|Y
01|233662|2|4|disclosed prior to acceptance of an order.|Y
01|233663|2|1|A tariff surcharge may be added to this quotation in|Y
01|233663|2|2|the event of a sustained tariff increase on the|Y
01|233663|2|3|importation of this product.  Any surcharge will be|Y
01|233663|2|4|disclosed prior to acceptance of an order.|Y
01|233664|3|1|A tariff surcharge may be added to this quotation in|Y
01|233664|3|2|the event of a sustained tariff increase on the|Y
01|233664|3|3|importation of this product.  Any surcharge will be|Y
01|233664|3|4|disclosed prior to acceptance of an order.|Y
01|233665|3|1|A tariff surcharge may be added to this quotation in|Y
01|233665|3|2|the event of a sustained tariff increase on the|Y
01|233665|3|3|importation of this product.  Any surcharge will be|Y
01|233665|3|4|disclosed prior to acceptance of an order.|Y
01|233666|40|1|A tariff surcharge may be added to this quotation in|Y
01|233666|40|2|the event of a sustained tariff increase on the|Y
01|233666|40|3|importation of this product.  Any surcharge will be|Y
01|233666|40|4|disclosed prior to acceptance of an order.|Y
01|233667|2|1|A tariff surcharge may be added to this quotation in|Y
01|233667|2|2|the event of a sustained tariff increase on the|Y
01|233667|2|3|importation of this product.  Any surcharge will be|Y
01|233667|2|4|disclosed prior to acceptance of an order.|Y
01|233668|7|1|A tariff surcharge may be added to this quotation in|Y
01|233668|7|2|the event of a sustained tariff increase on the|Y
01|233668|7|3|importation of this product.  Any surcharge will be|Y
01|233668|7|4|disclosed prior to acceptance of an order.|Y
01|233669|1|1|PO# 61685 LOC039 order error return to Vendor|Y
01|233669|2|1|A tariff surcharge may be added to this quotation in|Y
01|233669|2|2|the event of a sustained tariff increase on the|Y
01|233669|2|3|importation of this product.  Any surcharge will be|Y
01|233669|2|4|disclosed prior to acceptance of an order.|Y
01|233670|2|1|A tariff surcharge may be added to this quotation in|Y
01|233670|2|2|the event of a sustained tariff increase on the|Y
01|233670|2|3|importation of this product.  Any surcharge will be|Y
01|233670|2|4|disclosed prior to acceptance of an order.|Y
01|233671|3|1|A tariff surcharge may be added to this quotation in|Y
01|233671|3|2|the event of a sustained tariff increase on the|Y
01|233671|3|3|importation of this product.  Any surcharge will be|Y
01|233671|3|4|disclosed prior to acceptance of an order.|Y
01|233672|5|1|A tariff surcharge may be added to this quotation in|Y
01|233672|5|2|the event of a sustained tariff increase on the|Y
01|233672|5|3|importation of this product.  Any surcharge will be|Y
01|233672|5|4|disclosed prior to acceptance of an order.|Y
01|233673|2|1|A tariff surcharge may be added to this quotation in|Y
01|233673|2|2|the event of a sustained tariff increase on the|Y
01|233673|2|3|importation of this product.  Any surcharge will be|Y
01|233673|2|4|disclosed prior to acceptance of an order.|Y
01|233674|22|1|LA-50/100A/C10 Time is end of July/early August.|Y
01|233674|23|1|Only one remaining in stock. Replacement Item # for|Y
01|233674|23|2|CAT40 is NCL-ICAT40 (CAT40/IT40/SK40). Replacement Item|Y
01|233674|23|3|# for CAT50 is NCL-ICAT50 (CAT50/IT50/SK50).|Y
01|233674|26|1|A tariff surcharge may be added to this quotation in|Y
01|233674|26|2|the event of a sustained tariff increase on the|Y
01|233674|26|3|importation of this product.  Any surcharge will be|Y
01|233674|26|4|disclosed prior to acceptance of an order.|Y
01|233675|14|1|A tariff surcharge may be added to this quotation in|Y
01|233675|14|2|the event of a sustained tariff increase on the|Y
01|233675|14|3|importation of this product.  Any surcharge will be|Y
01|233675|14|4|disclosed prior to acceptance of an order.|Y
01|233676|7|1|A tariff surcharge may be added to this quotation in|Y
01|233676|7|2|the event of a sustained tariff increase on the|Y
01|233676|7|3|importation of this product.  Any surcharge will be|Y
01|233676|7|4|disclosed prior to acceptance of an order.|Y
01|233677|22|1|Estimated lead time is end of July/early August.|Y
01|233677|23|1|Currently only one (1) in stock. Replacement Item # for|Y
01|233677|23|2|CAT40 is NCL-ICAT40 (CAT40/IT40/SK40).  Replacement|Y
01|233677|23|3|Item # for CAT50 is NCL-ICAT50 (CAT50/IT50/SK50).|Y
01|233677|25|1|A tariff surcharge may be added to this quotation in|Y
01|233677|25|2|the event of a sustained tariff increase on the|Y
01|233677|25|3|importation of this product.  Any surcharge will be|Y
01|233677|25|4|disclosed prior to acceptance of an order.|Y
01|233678|5|1|A tariff surcharge may be added to this quotation in|Y
01|233678|5|2|the event of a sustained tariff increase on the|Y
01|233678|5|3|importation of this product.  Any surcharge will be|Y
01|233678|5|4|disclosed prior to acceptance of an order.|Y
01|233679|14|1|A tariff surcharge may be added to this quotation in|Y
01|233679|14|2|the event of a sustained tariff increase on the|Y
01|233679|14|3|importation of this product.  Any surcharge will be|Y
01|233679|14|4|disclosed prior to acceptance of an order.|Y
01|233680|2|1|A tariff surcharge may be added to this quotation in|Y
01|233680|2|2|the event of a sustained tariff increase on the|Y
01|233680|2|3|importation of this product.  Any surcharge will be|Y
01|233680|2|4|disclosed prior to acceptance of an order.|Y
01|233681|1|1|Please Note: This collet is special once a purchase|Y
01|233681|1|2|orer is placed it cannot be cancelled or returned.|Y
01|233681|2|1|A tariff surcharge may be added to this quotation in|Y
01|233681|2|2|the event of a sustained tariff increase on the|Y
01|233681|2|3|importation of this product.  Any surcharge will be|Y
01|233681|2|4|disclosed prior to acceptance of an order.|Y
01|233682|5|1|A tariff surcharge may be added to this quotation in|Y
01|233682|5|2|the event of a sustained tariff increase on the|Y
01|233682|5|3|importation of this product.  Any surcharge will be|Y
01|233682|5|4|disclosed prior to acceptance of an order.|Y
01|233683|6|1|A tariff surcharge may be added to this quotation in|Y
01|233683|6|2|the event of a sustained tariff increase on the|Y
01|233683|6|3|importation of this product.  Any surcharge will be|Y
01|233683|6|4|disclosed prior to acceptance of an order.|Y
01|233684|1|1|RGA#TAR-61943|Y
01|233684|1|2|5AX-130OSP3-M SN:5320|Y
01|233684|44|1|A tariff surcharge may be added to this quotation in|Y
01|233684|44|2|the event of a sustained tariff increase on the|Y
01|233684|44|3|importation of this product.  Any surcharge will be|Y
01|233684|44|4|disclosed prior to acceptance of an order.|Y
01|233685|3|1|A tariff surcharge may be added to this quotation in|Y
01|233685|3|2|the event of a sustained tariff increase on the|Y
01|233685|3|3|importation of this product.  Any surcharge will be|Y
01|233685|3|4|disclosed prior to acceptance of an order.|Y
01|233686|5|1|A tariff surcharge may be added to this quotation in|Y
01|233686|5|2|the event of a sustained tariff increase on the|Y
01|233686|5|3|importation of this product.  Any surcharge will be|Y
01|233686|5|4|disclosed prior to acceptance of an order.|Y
01|233687|4|1|A tariff surcharge may be added to this quotation in|Y
01|233687|4|2|the event of a sustained tariff increase on the|Y
01|233687|4|3|importation of this product.  Any surcharge will be|Y
01|233687|4|4|disclosed prior to acceptance of an order.|Y
01|233688|4|1|A tariff surcharge may be added to this quotation in|Y
01|233688|4|2|the event of a sustained tariff increase on the|Y
01|233688|4|3|importation of this product.  Any surcharge will be|Y
01|233688|4|4|disclosed prior to acceptance of an order.|Y
01|233689|2|1|A tariff surcharge may be added to this quotation in|Y
01|233689|2|2|the event of a sustained tariff increase on the|Y
01|233689|2|3|importation of this product.  Any surcharge will be|Y
01|233689|2|4|disclosed prior to acceptance of an order.|Y
01|233690|3|1|A tariff surcharge may be added to this quotation in|Y
01|233690|3|2|the event of a sustained tariff increase on the|Y
01|233690|3|3|importation of this product.  Any surcharge will be|Y
01|233690|3|4|disclosed prior to acceptance of an order.|Y
01|233691|2|1|A tariff surcharge may be added to this quotation in|Y
01|233691|2|2|the event of a sustained tariff increase on the|Y
01|233691|2|3|importation of this product.  Any surcharge will be|Y
01|233691|2|4|disclosed prior to acceptance of an order.|Y
01|233692|19|1|A tariff surcharge may be added to this quotation in|Y
01|233692|19|2|the event of a sustained tariff increase on the|Y
01|233692|19|3|importation of this product.  Any surcharge will be|Y
01|233692|19|4|disclosed prior to acceptance of an order.|Y
01|233693|2|1|A tariff surcharge may be added to this quotation in|Y
01|233693|2|2|the event of a sustained tariff increase on the|Y
01|233693|2|3|importation of this product.  Any surcharge will be|Y
01|233693|2|4|disclosed prior to acceptance of an order.|Y
01|233694|2|1|A tariff surcharge may be added to this quotation in|Y
01|233694|2|2|the event of a sustained tariff increase on the|Y
01|233694|2|3|importation of this product.  Any surcharge will be|Y
01|233694|2|4|disclosed prior to acceptance of an order.|Y
01|233695|2|1|A tariff surcharge may be added to this quotation in|Y
01|233695|2|2|the event of a sustained tariff increase on the|Y
01|233695|2|3|importation of this product.  Any surcharge will be|Y
01|233695|2|4|disclosed prior to acceptance of an order.|Y
01|233696|5|1|A tariff surcharge may be added to this quotation in|Y
01|233696|5|2|the event of a sustained tariff increase on the|Y
01|233696|5|3|importation of this product.  Any surcharge will be|Y
01|233696|5|4|disclosed prior to acceptance of an order.|Y
01|233697|6|1|A tariff surcharge may be added to this quotation in|Y
01|233697|6|2|the event of a sustained tariff increase on the|Y
01|233697|6|3|importation of this product.  Any surcharge will be|Y
01|233697|6|4|disclosed prior to acceptance of an order.|Y
01|233698|1|1|RGA#TOR-61946/|Y
01|233698|1|2|Repair of FI-5B  s/n:5MB2057|Y
01|233698|4|1|A tariff surcharge may be added to this quotation in|Y
01|233698|4|2|the event of a sustained tariff increase on the|Y
01|233698|4|3|importation of this product.  Any surcharge will be|Y
01|233698|4|4|disclosed prior to acceptance of an order.|Y
01|233699|2|1|A tariff surcharge may be added to this quotation in|Y
01|233699|2|2|the event of a sustained tariff increase on the|Y
01|233699|2|3|importation of this product.  Any surcharge will be|Y
01|233699|2|4|disclosed prior to acceptance of an order.|Y
01|233700|2|1|A tariff surcharge may be added to this quotation in|Y
01|233700|2|2|the event of a sustained tariff increase on the|Y
01|233700|2|3|importation of this product.  Any surcharge will be|Y
01|233700|2|4|disclosed prior to acceptance of an order.|Y
01|233701|4|1|A tariff surcharge may be added to this quotation in|Y
01|233701|4|2|the event of a sustained tariff increase on the|Y
01|233701|4|3|importation of this product.  Any surcharge will be|Y
01|233701|4|4|disclosed prior to acceptance of an order.|Y
01|233702|5|1|A tariff surcharge may be added to this quotation in|Y
01|233702|5|2|the event of a sustained tariff increase on the|Y
01|233702|5|3|importation of this product.  Any surcharge will be|Y
01|233702|5|4|disclosed prior to acceptance of an order.|Y
01|233703|20|1|A tariff surcharge may be added to this quotation in|Y
01|233703|20|2|the event of a sustained tariff increase on the|Y
01|233703|20|3|importation of this product.  Any surcharge will be|Y
01|233703|20|4|disclosed prior to acceptance of an order.|Y
01|233704|1|1|KM3/4-15/64|Y
01|233704|1|2|Straight Collet/Sleeve OD 3/4 ID 15/64|Y
01|233704|2|1|KM3/4-9/32|Y
01|233704|2|2|Straight Collet/Sleeve OD 3/4 ID 9/32|Y
01|233704|3|1|A tariff surcharge may be added to this quotation in|Y
01|233704|3|2|the event of a sustained tariff increase on the|Y
01|233704|3|3|importation of this product.  Any surcharge will be|Y
01|233704|3|4|disclosed prior to acceptance of an order.|Y
01|233706|3|1|A tariff surcharge may be added to this quotation in|Y
01|233706|3|2|the event of a sustained tariff increase on the|Y
01|233706|3|3|importation of this product.  Any surcharge will be|Y
01|233706|3|4|disclosed prior to acceptance of an order.|Y
01|233707|4|1|A tariff surcharge may be added to this quotation in|Y
01|233707|4|2|the event of a sustained tariff increase on the|Y
01|233707|4|3|importation of this product.  Any surcharge will be|Y
01|233707|4|4|disclosed prior to acceptance of an order.|Y
01|233708|2|1|A tariff surcharge may be added to this quotation in|Y
01|233708|2|2|the event of a sustained tariff increase on the|Y
01|233708|2|3|importation of this product.  Any surcharge will be|Y
01|233708|2|4|disclosed prior to acceptance of an order.|Y
01|233709|3|1|A tariff surcharge may be added to this quotation in|Y
01|233709|3|2|the event of a sustained tariff increase on the|Y
01|233709|3|3|importation of this product.  Any surcharge will be|Y
01|233709|3|4|disclosed prior to acceptance of an order.|Y
01|233710|2|1|A tariff surcharge may be added to this quotation in|Y
01|233710|2|2|the event of a sustained tariff increase on the|Y
01|233710|2|3|importation of this product.  Any surcharge will be|Y
01|233710|2|4|disclosed prior to acceptance of an order.|Y
01|233711|3|1|A tariff surcharge may be added to this quotation in|Y
01|233711|3|2|the event of a sustained tariff increase on the|Y
01|233711|3|3|importation of this product.  Any surcharge will be|Y
01|233711|3|4|disclosed prior to acceptance of an order.|Y
01|233712|1|1|RGA#CUR-61965/|Y
01|233712|1|2|Repair of C50RAM-MI50-180 s/n: 70705095 02|Y
01|233712|1|3|(Mimatic#178152)|Y
01|233712|2|1|Bearings seals and o-rings to be replaced.|Y
01|233712|3|1|A tariff surcharge may be added to this quotation in|Y
01|233712|3|2|the event of a sustained tariff increase on the|Y
01|233712|3|3|importation of this product.  Any surcharge will be|Y
01|233712|3|4|disclosed prior to acceptance of an order.|Y
01|233714|1|1|Req.INS/Install E16-NUT & ER16-SCREW(S)|Y
01|233714|2|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|233714|3|1|Req.INS/Install S7/16-20X3/8|Y
01|233714|4|1|Req.INS/Install S5/8-18X1/2|Y
01|233714|5|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|233714|6|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|233714|7|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|233714|8|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|233714|9|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|233714|10|1|Req.INS/Install E32-NUT|Y
01|233714|11|1|Req.INS/Install E40-NUT|Y
01|233714|12|1|Req.INS/Install S5/8-18X1/2|Y
01|233714|13|1|A tariff surcharge may be added to this quotation in|Y
01|233714|13|2|the event of a sustained tariff increase on the|Y
01|233714|13|3|importation of this product.  Any surcharge will be|Y
01|233714|13|4|disclosed prior to acceptance of an order.|Y
01|233715|3|1|A tariff surcharge may be added to this quotation in|Y
01|233715|3|2|the event of a sustained tariff increase on the|Y
01|233715|3|3|importation of this product.  Any surcharge will be|Y
01|233715|3|4|disclosed prior to acceptance of an order.|Y
01|233716|1|1|RGA#TAR-61630|Y
01|233716|2|1|A tariff surcharge may be added to this quotation in|Y
01|233716|2|2|the event of a sustained tariff increase on the|Y
01|233716|2|3|importation of this product.  Any surcharge will be|Y
01|233716|2|4|disclosed prior to acceptance of an order.|Y
01|233717|1|1|Lead time is 4~5 days after receipt of an order.|Y
01|233717|4|1|A tariff surcharge may be added to this quotation in|Y
01|233717|4|2|the event of a sustained tariff increase on the|Y
01|233717|4|3|importation of this product.  Any surcharge will be|Y
01|233717|4|4|disclosed prior to acceptance of an order.|Y
01|233718|2|1|A tariff surcharge may be added to this quotation in|Y
01|233718|2|2|the event of a sustained tariff increase on the|Y
01|233718|2|3|importation of this product.  Any surcharge will be|Y
01|233718|2|4|disclosed prior to acceptance of an order.|Y
01|233719|2|1|A tariff surcharge may be added to this quotation in|Y
01|233719|2|2|the event of a sustained tariff increase on the|Y
01|233719|2|3|importation of this product.  Any surcharge will be|Y
01|233719|2|4|disclosed prior to acceptance of an order.|Y
01|233720|3|1|A tariff surcharge may be added to this quotation in|Y
01|233720|3|2|the event of a sustained tariff increase on the|Y
01|233720|3|3|importation of this product.  Any surcharge will be|Y
01|233720|3|4|disclosed prior to acceptance of an order.|Y
01|233721|3|1|A tariff surcharge may be added to this quotation in|Y
01|233721|3|2|the event of a sustained tariff increase on the|Y
01|233721|3|3|importation of this product.  Any surcharge will be|Y
01|233721|3|4|disclosed prior to acceptance of an order.|Y
01|233722|2|1|A tariff surcharge may be added to this quotation in|Y
01|233722|2|2|the event of a sustained tariff increase on the|Y
01|233722|2|3|importation of this product.  Any surcharge will be|Y
01|233722|2|4|disclosed prior to acceptance of an order.|Y
01|233723|6|1|A tariff surcharge may be added to this quotation in|Y
01|233723|6|2|the event of a sustained tariff increase on the|Y
01|233723|6|3|importation of this product.  Any surcharge will be|Y
01|233723|6|4|disclosed prior to acceptance of an order.|Y
01|233724|2|1|A tariff surcharge may be added to this quotation in|Y
01|233724|2|2|the event of a sustained tariff increase on the|Y
01|233724|2|3|importation of this product.  Any surcharge will be|Y
01|233724|2|4|disclosed prior to acceptance of an order.|Y
01|233725|2|1|A tariff surcharge may be added to this quotation in|Y
01|233725|2|2|the event of a sustained tariff increase on the|Y
01|233725|2|3|importation of this product.  Any surcharge will be|Y
01|233725|2|4|disclosed prior to acceptance of an order.|Y
01|233726|1|1|**Discontinued Stock - cannot be cancelled or returned|Y
01|233726|3|1|A tariff surcharge may be added to this quotation in|Y
01|233726|3|2|the event of a sustained tariff increase on the|Y
01|233726|3|3|importation of this product.  Any surcharge will be|Y
01|233726|3|4|disclosed prior to acceptance of an order.|Y
01|233727|3|1|A tariff surcharge may be added to this quotation in|Y
01|233727|3|2|the event of a sustained tariff increase on the|Y
01|233727|3|3|importation of this product.  Any surcharge will be|Y
01|233727|3|4|disclosed prior to acceptance of an order.|Y
01|233728|4|1|A tariff surcharge may be added to this quotation in|Y
01|233728|4|2|the event of a sustained tariff increase on the|Y
01|233728|4|3|importation of this product.  Any surcharge will be|Y
01|233728|4|4|disclosed prior to acceptance of an order.|Y
01|233729|1|1|RGA#TOR-61961/|Y
01|233729|1|2|Repair of CAT50-UMT200UW|Y
01|233729|4|1|A tariff surcharge may be added to this quotation in|Y
01|233729|4|2|the event of a sustained tariff increase on the|Y
01|233729|4|3|importation of this product.  Any surcharge will be|Y
01|233729|4|4|disclosed prior to acceptance of an order.|Y
01|233730|2|1|A tariff surcharge may be added to this quotation in|Y
01|233730|2|2|the event of a sustained tariff increase on the|Y
01|233730|2|3|importation of this product.  Any surcharge will be|Y
01|233730|2|4|disclosed prior to acceptance of an order.|Y
01|233731|2|1|A tariff surcharge may be added to this quotation in|Y
01|233731|2|2|the event of a sustained tariff increase on the|Y
01|233731|2|3|importation of this product.  Any surcharge will be|Y
01|233731|2|4|disclosed prior to acceptance of an order.|Y
01|233732|2|1|Please note additional 20% applied per overstock promo.|Y
01|233732|2|2|These cannot be cancelled or returned once PO/order has|Y
01|233732|2|3|been placed.|Y
01|233732|3|1|A tariff surcharge may be added to this quotation in|Y
01|233732|3|2|the event of a sustained tariff increase on the|Y
01|233732|3|3|importation of this product.  Any surcharge will be|Y
01|233732|3|4|disclosed prior to acceptance of an order.|Y
01|233733|4|1|A tariff surcharge may be added to this quotation in|Y
01|233733|4|2|the event of a sustained tariff increase on the|Y
01|233733|4|3|importation of this product.  Any surcharge will be|Y
01|233733|4|4|disclosed prior to acceptance of an order.|Y
01|233734|2|1|Haas Certified Scale + Cable|Y
01|233734|2|2|Includes L/N Scale Mounting Kit and Cover|Y
01|233734|3|1|A tariff surcharge may be added to this quotation in|Y
01|233734|3|2|the event of a sustained tariff increase on the|Y
01|233734|3|3|importation of this product.  Any surcharge will be|Y
01|233734|3|4|disclosed prior to acceptance of an order.|Y
01|233735|2|1|A tariff surcharge may be added to this quotation in|Y
01|233735|2|2|the event of a sustained tariff increase on the|Y
01|233735|2|3|importation of this product.  Any surcharge will be|Y
01|233735|2|4|disclosed prior to acceptance of an order.|Y
01|233736|5|1|A tariff surcharge may be added to this quotation in|Y
01|233736|5|2|the event of a sustained tariff increase on the|Y
01|233736|5|3|importation of this product.  Any surcharge will be|Y
01|233736|5|4|disclosed prior to acceptance of an order.|Y
01|233737|5|1|A tariff surcharge may be added to this quotation in|Y
01|233737|5|2|the event of a sustained tariff increase on the|Y
01|233737|5|3|importation of this product.  Any surcharge will be|Y
01|233737|5|4|disclosed prior to acceptance of an order.|Y
01|233739|2|1|A tariff surcharge may be added to this quotation in|Y
01|233739|2|2|the event of a sustained tariff increase on the|Y
01|233739|2|3|importation of this product.  Any surcharge will be|Y
01|233739|2|4|disclosed prior to acceptance of an order.|Y
01|233740|5|1|A tariff surcharge may be added to this quotation in|Y
01|233740|5|2|the event of a sustained tariff increase on the|Y
01|233740|5|3|importation of this product.  Any surcharge will be|Y
01|233740|5|4|disclosed prior to acceptance of an order.|Y
01|233741|1|1|Please note: Discount reflects the Lyndex-Nikken|Y
01|233741|1|2|Overstock promotion. These items are non-returnable.|Y
01|233741|3|1|A tariff surcharge may be added to this quotation in|Y
01|233741|3|2|the event of a sustained tariff increase on the|Y
01|233741|3|3|importation of this product.  Any surcharge will be|Y
01|233741|3|4|disclosed prior to acceptance of an order.|Y
01|233742|3|1|A tariff surcharge may be added to this quotation in|Y
01|233742|3|2|the event of a sustained tariff increase on the|Y
01|233742|3|3|importation of this product.  Any surcharge will be|Y
01|233742|3|4|disclosed prior to acceptance of an order.|Y
01|233743|10|1|H80F-SF12-70B-IDI|Y
01|233743|10|2|HSK80F 12mm Shrink Fit 70mm gl|Y
01|233743|10|3|Balanced and Balanceable BuiltInChip and coolant tube|Y
01|233743|21|1|A tariff surcharge may be added to this quotation in|Y
01|233743|21|2|the event of a sustained tariff increase on the|Y
01|233743|21|3|importation of this product.  Any surcharge will be|Y
01|233743|21|4|disclosed prior to acceptance of an order.|Y
01|233744|6|1|A tariff surcharge may be added to this quotation in|Y
01|233744|6|2|the event of a sustained tariff increase on the|Y
01|233744|6|3|importation of this product.  Any surcharge will be|Y
01|233744|6|4|disclosed prior to acceptance of an order.|Y
01|233745|13|1|A tariff surcharge may be added to this quotation in|Y
01|233745|13|2|the event of a sustained tariff increase on the|Y
01|233745|13|3|importation of this product.  Any surcharge will be|Y
01|233745|13|4|disclosed prior to the acceptance of an order.|Y
01|233746|2|1|A tariff surcharge may be added to this quotation in|Y
01|233746|2|2|the event of a sustained tariff increase on the|Y
01|233746|2|3|importation of this product.  Any surcharge will be|Y
01|233746|2|4|disclosed prior to acceptance of an order.|Y
01|233747|27|1|A tariff surcharge may be added to this quotation in|Y
01|233747|27|2|the event of a sustained tariff increase on the|Y
01|233747|27|3|importation of this product.  Any surcharge will be|Y
01|233747|27|4|disclosed prior to acceptance of an order.|Y
01|233748|3|1|A tariff surcharge may be added to this quotation in|Y
01|233748|3|2|the event of a sustained tariff increase on the|Y
01|233748|3|3|importation of this product.  Any surcharge will be|Y
01|233748|3|4|disclosed prior to acceptance of an order.|Y
01|233749|2|1|A tariff surcharge may be added to this quotation in|Y
01|233749|2|2|the event of a sustained tariff increase on the|Y
01|233749|2|3|importation of this product.  Any surcharge will be|Y
01|233749|2|4|disclosed prior to acceptance of an order.|Y
01|233750|3|1|A tariff surcharge may be added to this quotation in|Y
01|233750|3|2|the event of a sustained tariff increase on the|Y
01|233750|3|3|importation of this product.  Any surcharge will be|Y
01|233750|3|4|disclosed prior to acceptance of an order.|Y
01|233751|2|1|A tariff surcharge may be added to this quotation in|Y
01|233751|2|2|the event of a sustained tariff increase on the|Y
01|233751|2|3|importation of this product.  Any surcharge will be|Y
01|233751|2|4|disclosed prior to acceptance of an order.|Y
01|233752|4|1|A tariff surcharge may be added to this quotation in|Y
01|233752|4|2|the event of a sustained tariff increase on the|Y
01|233752|4|3|importation of this product.  Any surcharge will be|Y
01|233752|4|4|disclosed prior to acceptance of an order.|Y
01|233753|2|1|A tariff surcharge may be added to this quotation in|Y
01|233753|2|2|the event of a sustained tariff increase on the|Y
01|233753|2|3|importation of this product.  Any surcharge will be|Y
01|233753|2|4|disclosed prior to acceptance of an order.|Y
01|233754|1|1|Quoted at Net price.|Y
01|233754|2|1|A tariff surcharge may be added to this quotation in|Y
01|233754|2|2|the event of a sustained tariff increase on the|Y
01|233754|2|3|importation of this product.  Any surcharge will be|Y
01|233754|2|4|disclosed prior to acceptance of an order.|Y
01|233755|2|1|A tariff surcharge may be added to this quotation in|Y
01|233755|2|2|the event of a sustained tariff increase on the|Y
01|233755|2|3|importation of this product.  Any surcharge will be|Y
01|233755|2|4|disclosed prior to acceptance of an order.|Y
01|233756|1|1|Discount reflects Overstock promotion. Tool is|Y
01|233756|1|2|non returnable and we only have 1 in stock.|Y
01|233756|2|1|Discount reflects Overstock promotion. Tool is|Y
01|233756|2|2|non returnable and we only have 1 in stock.|Y
01|233756|5|1|A tariff surcharge may be added to this quotation in|Y
01|233756|5|2|the event of a sustained tariff increase on the|Y
01|233756|5|3|importation of this product.  Any surcharge will be|Y
01|233756|5|4|disclosed prior to acceptance of an order.|Y
01|233757|2|1|A tariff surcharge may be added to this quotation in|Y
01|233757|2|2|the event of a sustained tariff increase on the|Y
01|233757|2|3|importation of this product.  Any surcharge will be|Y
01|233757|2|4|disclosed prior to acceptance of an order.|Y
01|233758|2|1|A tariff surcharge may be added to this quotation in|Y
01|233758|2|2|the event of a sustained tariff increase on the|Y
01|233758|2|3|importation of this product.  Any surcharge will be|Y
01|233758|2|4|disclosed prior to acceptance of an order.|Y
01|233759|2|1|A tariff surcharge may be added to this quotation in|Y
01|233759|2|2|the event of a sustained tariff increase on the|Y
01|233759|2|3|importation of this product.  Any surcharge will be|Y
01|233759|2|4|disclosed prior to acceptance of an order.|Y
01|233760|10|1|A tariff surcharge may be added to this quotation in|Y
01|233760|10|2|the event of a sustained tariff increase on the|Y
01|233760|10|3|importation of this product.  Any surcharge will be|Y
01|233760|10|4|disclosed prior to acceptance of an order.|Y
01|233761|1|1|T/P Inspection Required|Y
01|233761|2|1|T/P Inspection Required|Y
01|233761|3|1|T/P Inspection Required|Y
01|233761|4|1|T/P Inspection Required|Y
01|233761|5|1|T/P Inspection Required|Y
01|233761|6|1|T/P Inspection Required|Y
01|233761|7|1|T/P Inspection Required|Y
01|233761|8|1|T/P Inspection Required|Y
01|233761|9|1|T/P Inspection Required|Y
01|233761|10|1|T/P Inspection Required|Y
01|233761|11|1|T/P Inspection Required|Y
01|233761|12|1|T/P Inspection Required|Y
01|233761|13|1|T/P Inspection Required|Y
01|233761|14|1|A tariff surcharge may be added to this quotation in|Y
01|233761|14|2|the event of a sustained tariff increase on the|Y
01|233761|14|3|importation of this product.  Any surcharge will be|Y
01|233761|14|4|disclosed prior to acceptance of an order.|Y
01|233762|2|1|A tariff surcharge may be added to this quotation in|Y
01|233762|2|2|the event of a sustained tariff increase on the|Y
01|233762|2|3|importation of this product.  Any surcharge will be|Y
01|233762|2|4|disclosed prior to acceptance of an order.|Y
01|233763|6|1|A tariff surcharge may be added to this quotation in|Y
01|233763|6|2|the event of a sustained tariff increase on the|Y
01|233763|6|3|importation of this product.  Any surcharge will be|Y
01|233763|6|4|disclosed prior to acceptance of an order.|Y
01|233764|2|1|Additional 20% discount added for our Overstock|Y
01|233764|2|2|Promotion.  Once a Purchase Order has been received|Y
01|233764|2|3|this item cannot be cancelled or returned.|Y
01|233764|5|1|A tariff surcharge may be added to this quotation in|Y
01|233764|5|2|the event of a sustained tariff increase on the|Y
01|233764|5|3|importation of this product.  Any surcharge will be|Y
01|233764|5|4|disclosed prior to acceptance of an order.|Y
01|233765|38|1|A tariff surcharge may be added to this quotation in|Y
01|233765|38|2|the event of a sustained tariff increase on the|Y
01|233765|38|3|importation of this product.  Any surcharge will be|Y
01|233765|38|4|disclosed prior to acceptance of an order.|Y
01|233766|3|1|A tariff surcharge may be added to this quotation in|Y
01|233766|3|2|the event of a sustained tariff increase on the|Y
01|233766|3|3|importation of this product.  Any surcharge will be|Y
01|233766|3|4|disclosed prior to acceptance of an order.|Y
01|233767|1|1|Ships 1 to 2 weeks ARO|Y
01|233768|8|1|Current Boring Bar: CAT40-BCB29-150U (Boring Depth =|Y
01|233768|8|2|4.57(16mm) has been Discontinued.  Lines 8-9 is|Y
01|233768|8|3|alternate modular style Boring Depth(M) 3.54(90mm).|Y
01|233768|18|1|Current Boring Bar: CAT40-BCB22-135U (Boring Depth =|Y
01|233768|18|2|3.85(97mm) has been Discontinued.  Lines 18~19 is|Y
01|233768|18|3|alternate modular style Boring Depth(M) 2.64(67mm).|Y
01|233768|28|1|Current Boring Bar: CAT40-BCB19-120U (Boring Depth =|Y
01|233768|28|2|3.27(83mm) has been Discontinued.  Lines 28~29 is|Y
01|233768|28|3|alternate modular style Boring Depth(M) 4.33(110mm).|Y
01|233768|33|1|NO CARTRIDGE AVAILABLE.|Y
01|233768|37|1|Current Boring Bar: CAT40-BCB14.5-105U(Boring Depth =|Y
01|233768|37|2|2.68(68mm) has been Discontinued.  Lines 37~38 is|Y
01|233768|37|3|alternate modular style Boring Depth(M) 3.35(85mm).|Y
01|233768|47|1|Current Boring Bar: CAT40-BCB48-210U(Boring Depth =|Y
01|233768|47|2|6.81(172mm) has been Discontinued.  Lines 47~49 is|Y
01|233768|47|3|alternate modular style Boring Depth(M) 6.18(157mm).|Y
01|233768|52|1|A tariff surcharge may be added to this quotation in|Y
01|233768|52|2|the event of a sustained tariff increase on the|Y
01|233768|52|3|importation of this product.  Any surcharge will be|Y
01|233768|52|4|disclosed prior to acceptance of an order.|Y
01|233769|3|1|A tariff surcharge may be added to this quotation in|Y
01|233769|3|2|the event of a sustained tariff increase on the|Y
01|233769|3|3|importation of this product.  Any surcharge will be|Y
01|233769|3|4|disclosed prior to acceptance of an order.|Y
01|233770|3|1|A tariff surcharge may be added to this quotation in|Y
01|233770|3|2|the event of a sustained tariff increase on the|Y
01|233770|3|3|importation of this product.  Any surcharge will be|Y
01|233770|3|4|disclosed prior to acceptance of an order.|Y
01|233771|2|1|A tariff surcharge may be added to this quotation in|Y
01|233771|2|2|the event of a sustained tariff increase on the|Y
01|233771|2|3|importation of this product.  Any surcharge will be|Y
01|233771|2|4|disclosed prior to acceptance of an order.|Y
01|233772|2|1|A tariff surcharge may be added to this quotation in|Y
01|233772|2|2|the event of a sustained tariff increase on the|Y
01|233772|2|3|importation of this product.  Any surcharge will be|Y
01|233772|2|4|disclosed prior to acceptance of an order.|Y
01|233773|1|1|Non-standard stock - cannot be cancelled or returned|Y
01|233773|12|1|A tariff surcharge may be added to this quotation in|Y
01|233773|12|2|the event of a sustained tariff increase on the|Y
01|233773|12|3|importation of this product.  Any surcharge will be|Y
01|233773|12|4|disclosed prior to acceptance of an order.|Y
01|233774|2|1|A tariff surcharge may be added to this quotation in|Y
01|233774|2|2|the event of a sustained tariff increase on the|Y
01|233774|2|3|importation of this product.  Any surcharge will be|Y
01|233774|2|4|disclosed prior to acceptance of an order.|Y
01|233775|2|1|A tariff surcharge may be added to this quotation in|Y
01|233775|2|2|the event of a sustained tariff increase on the|Y
01|233775|2|3|importation of this product.  Any surcharge will be|Y
01|233775|2|4|disclosed prior to acceptance of an order.|Y
01|233776|3|1|A tariff surcharge may be added to this quotation in|Y
01|233776|3|2|the event of a sustained tariff increase on the|Y
01|233776|3|3|importation of this product.  Any surcharge will be|Y
01|233776|3|4|disclosed prior to acceptance of an order.|Y
01|233777|43|1|A tariff surcharge may be added to this quotation in|Y
01|233777|43|2|the event of a sustained tariff increase on the|Y
01|233777|43|3|importation of this product.  Any surcharge will be|Y
01|233777|43|4|disclosed prior to acceptance of an order.|Y
01|233778|3|1|A tariff surcharge may be added to this quotation in|Y
01|233778|3|2|the event of a sustained tariff increase on the|Y
01|233778|3|3|importation of this product.  Any surcharge will be|Y
01|233778|3|4|disclosed prior to acceptance of an order.|Y
01|233779|2|1|A tariff surcharge may be added to this quotation in|Y
01|233779|2|2|the event of a sustained tariff increase on the|Y
01|233779|2|3|importation of this product.  Any surcharge will be|Y
01|233779|2|4|disclosed prior to acceptance of an order.|Y
01|233780|5|1|A tariff surcharge may be added to this quotation in|Y
01|233780|5|2|the event of a sustained tariff increase on the|Y
01|233780|5|3|importation of this product.  Any surcharge will be|Y
01|233780|5|4|disclosed prior to acceptance of an order.|Y
01|233781|3|1|A tariff surcharge may be added to this quotation in|Y
01|233781|3|2|the event of a sustained tariff increase on the|Y
01|233781|3|3|importation of this product.  Any surcharge will be|Y
01|233781|3|4|disclosed prior to acceptance of an order.|Y
01|233782|1|1|RGA#TAR-61971|Y
01|233782|1|2|CNCZ180LSABR SN: 28278T|Y
01|233782|19|1|A tariff surcharge may be added to this quotation in|Y
01|233782|19|2|the event of a sustained tariff increase on the|Y
01|233782|19|3|importation of this product.  Any surcharge will be|Y
01|233782|19|4|disclosed prior to acceptance of an order.|Y
01|233783|3|1|A tariff surcharge may be added to this quotation in|Y
01|233783|3|2|the event of a sustained tariff increase on the|Y
01|233783|3|3|importation of this product.  Any surcharge will be|Y
01|233783|3|4|disclosed prior to acceptance of an order.|Y
01|233784|4|1|A tariff surcharge may be added to this quotation in|Y
01|233784|4|2|the event of a sustained tariff increase on the|Y
01|233784|4|3|importation of this product.  Any surcharge will be|Y
01|233784|4|4|disclosed prior to acceptance of an order.|Y
01|233785|3|1|A tariff surcharge may be added to this quotation in|Y
01|233785|3|2|the event of a sustained tariff increase on the|Y
01|233785|3|3|importation of this product.  Any surcharge will be|Y
01|233785|3|4|disclosed prior to acceptance of an order.|Y
01|233786|6|1|A tariff surcharge may be added to this quotation in|Y
01|233786|6|2|the event of a sustained tariff increase on the|Y
01|233786|6|3|importation of this product.  Any surcharge will be|Y
01|233786|6|4|disclosed prior to acceptance of an order.|Y
01|233787|2|1|A tariff surcharge may be added to this quotation in|Y
01|233787|2|2|the event of a sustained tariff increase on the|Y
01|233787|2|3|importation of this product.  Any surcharge will be|Y
01|233787|2|4|disclosed prior to acceptance of an order.|Y
01|233788|4|1|A tariff surcharge may be added to this quotation in|Y
01|233788|4|2|the event of a sustained tariff increase on the|Y
01|233788|4|3|importation of this product.  Any surcharge will be|Y
01|233788|4|4|disclosed prior to acceptance of an order.|Y
01|233789|1|1|1st batch(w/IDU)|Y
01|233789|2|1|A tariff surcharge may be added to this quotation in|Y
01|233789|2|2|the event of a sustained tariff increase on the|Y
01|233789|2|3|importation of this product.  Any surcharge will be|Y
01|233789|2|4|disclosed prior to acceptance of an order.|Y
01|233790|7|1|A tariff surcharge may be added to this quotation in|Y
01|233790|7|2|the event of a sustained tariff increase on the|Y
01|233790|7|3|importation of this product.  Any surcharge will be|Y
01|233790|7|4|disclosed prior to acceptance of an order.|Y
01|233792|1|1|Haas VMC must have 4th axis interface and 3rd Option|Y
01|233792|1|2|The Nikken Table will include the power and feedback|Y
01|233792|1|3|cables from the Nikken table to machine bulkhead|Y
01|233792|2|1|4th and 5th axis Cables|Y
01|233792|3|1|A tariff surcharge may be added to this quotation in|Y
01|233792|3|2|the event of a sustained tariff increase on the|Y
01|233792|3|3|importation of this product.  Any surcharge will be|Y
01|233792|3|4|disclosed prior to acceptance of an order.|Y
01|233793|5|1|A tariff surcharge may be added to this quotation in|Y
01|233793|5|2|the event of a sustained tariff increase on the|Y
01|233793|5|3|importation of this product.  Any surcharge will be|Y
01|233793|5|4|disclosed prior to acceptance of an order.|Y
01|233794|2|1|A tariff surcharge may be added to this quotation in|Y
01|233794|2|2|the event of a sustained tariff increase on the|Y
01|233794|2|3|importation of this product.  Any surcharge will be|Y
01|233794|2|4|disclosed prior to acceptance of an order.|Y
01|233795|19|1|A tariff surcharge may be added to this quotation in|Y
01|233795|19|2|the event of a sustained tariff increase on the|Y
01|233795|19|3|importation of this product.  Any surcharge will be|Y
01|233795|19|4|disclosed prior to acceptance of an order.|Y
01|233796|1|1|Repair Period: 5-6weeks|Y
01|233796|1|2|(Parts 2weeks mfg. + Shipping 2weeks + Repair 1-2weeks)|Y
01|233796|1|3|CNCZ302FA-HS 10+1RJ SN 7180 EU: RDC|Y
01|233796|2|1|If order a repair or new table we will deny this cost.|Y
01|233796|3|1|A tariff surcharge may be added to this quotation in|Y
01|233796|3|2|the event of a sustained tariff increase on the|Y
01|233796|3|3|importation of this product.  Any surcharge will be|Y
01|233796|3|4|disclosed prior to acceptance of an order.|Y
01|233797|10|1|A tariff surcharge may be added to this quotation in|Y
01|233797|10|2|the event of a sustained tariff increase on the|Y
01|233797|10|3|importation of this product.  Any surcharge will be|Y
01|233797|10|4|disclosed prior to acceptance of an order.|Y
01|233798|2|1|A tariff surcharge may be added to this quotation in|Y
01|233798|2|2|the event of a sustained tariff increase on the|Y
01|233798|2|3|importation of this product.  Any surcharge will be|Y
01|233798|2|4|disclosed prior to acceptance of an order.|Y
01|233799|4|1|A tariff surcharge may be added to this quotation in|Y
01|233799|4|2|the event of a sustained tariff increase on the|Y
01|233799|4|3|importation of this product.  Any surcharge will be|Y
01|233799|4|4|disclosed prior to acceptance of an order.|Y
01|233800|4|1|Delivery: 8pcs STOCK 4 pcs 3wks Balance 5 Wks|Y
01|233800|8|1|Delivery: 1pc STOCK 6 pcs 3Wks Balance 5 Wks|Y
01|233800|9|1|Delivery: 1pc STOCK 6 pcs 3Wks4 pcs 5 Wks Balance|Y
01|233800|9|2|11 Wks|Y
01|233800|17|1|DELIVERY: 3pcs STOCK 10pcs 4-5 Wks Balance 12 Wks|Y
01|233800|18|1|DELIVERY: 3pcs STOCK 10pcs 4-5 Wks Balance 12 Wks|Y
01|233800|22|1|Delivery: 5pcs STOCK 2pcs 2 Wks Balance 6-7 Wks|Y
01|233800|23|1|Delivery: 5pcs STOCK 2pcs 2 Wks 10 pcs 6-7 Wks|Y
01|233800|23|2|balance 12 Wks|Y
01|233800|24|1|Delivery: 5pcs STOCK 2pcs 2 Wks 10 pcs 6-7 Wks|Y
01|233800|24|2|balance 12 Wks|Y
01|233801|3|1|A tariff surcharge may be added to this quotation in|Y
01|233801|3|2|the event of a sustained tariff increase on the|Y
01|233801|3|3|importation of this product.  Any surcharge will be|Y
01|233801|3|4|disclosed prior to acceptance of an order.|Y
01|233802|2|1|A tariff surcharge may be added to this quotation in|Y
01|233802|2|2|the event of a sustained tariff increase on the|Y
01|233802|2|3|importation of this product.  Any surcharge will be|Y
01|233802|2|4|disclosed prior to acceptance of an order.|Y
01|233803|4|1|A tariff surcharge may be added to this quotation in|Y
01|233803|4|2|the event of a sustained tariff increase on the|Y
01|233803|4|3|importation of this product.  Any surcharge will be|Y
01|233803|4|4|disclosed prior to acceptance of an order.|Y
01|233804|3|1|A tariff surcharge may be added to this quotation in|Y
01|233804|3|2|the event of a sustained tariff increase on the|Y
01|233804|3|3|importation of this product.  Any surcharge will be|Y
01|233804|3|4|disclosed prior to acceptance of an order.|Y
01|233806|2|1|A tariff surcharge may be added to this quotation in|Y
01|233806|2|2|the event of a sustained tariff increase on the|Y
01|233806|2|3|importation of this product.  Any surcharge will be|Y
01|233806|2|4|disclosed prior to acceptance of an order.|Y
01|233807|2|1|A tariff surcharge may be added to this quotation in|Y
01|233807|2|2|the event of a sustained tariff increase on the|Y
01|233807|2|3|importation of this product.  Any surcharge will be|Y
01|233807|2|4|disclosed prior to acceptance of an order.|Y
01|233808|2|1|A tariff surcharge may be added to this quotation in|Y
01|233808|2|2|the event of a sustained tariff increase on the|Y
01|233808|2|3|importation of this product.  Any surcharge will be|Y
01|233808|2|4|disclosed prior to acceptance of an order.|Y
01|233809|3|1|A tariff surcharge may be added to this quotation in|Y
01|233809|3|2|the event of a sustained tariff increase on the|Y
01|233809|3|3|importation of this product.  Any surcharge will be|Y
01|233809|3|4|disclosed prior to acceptance of an order.|Y
01|233810|3|1|A tariff surcharge may be added to this quotation in|Y
01|233810|3|2|the event of a sustained tariff increase on the|Y
01|233810|3|3|importation of this product.  Any surcharge will be|Y
01|233810|3|4|disclosed prior to acceptance of an order.|Y
01|233811|4|1|A tariff surcharge may be added to this quotation in|Y
01|233811|4|2|the event of a sustained tariff increase on the|Y
01|233811|4|3|importation of this product.  Any surcharge will be|Y
01|233811|4|4|disclosed prior to acceptance of an order.|Y
01|233812|2|1|A tariff surcharge may be added to this quotation in|Y
01|233812|2|2|the event of a sustained tariff increase on the|Y
01|233812|2|3|importation of this product.  Any surcharge will be|Y
01|233812|2|4|disclosed prior to acceptance of an order.|Y
01|233813|16|1|A tariff surcharge may be added to this quotation in|Y
01|233813|16|2|the event of a sustained tariff increase on the|Y
01|233813|16|3|importation of this product.  Any surcharge will be|Y
01|233813|16|4|disclosed prior to acceptance of an order.|Y
01|233814|6|1|Package Pricing to support Stallion 10/30|Y
01|233814|7|1|A tariff surcharge of 8% will be added to every order|Y
01|233814|7|2|placed after September 1st 2025(until further notice).|Y
01|233814|7|3|This surcharge will be acknowledged upon acceptance|Y
01|233814|7|4|of every order.|Y
01|233815|3|1|A tariff surcharge may be added to this quotation in|Y
01|233815|3|2|the event of a sustained tariff increase on the|Y
01|233815|3|3|importation of this product.  Any surcharge will be|Y
01|233815|3|4|disclosed prior to acceptance of an order.|Y
01|233816|2|1|A tariff surcharge may be added to this quotation in|Y
01|233816|2|2|the event of a sustained tariff increase on the|Y
01|233816|2|3|importation of this product.  Any surcharge will be|Y
01|233816|2|4|disclosed prior to acceptance of an order.|Y
01|233817|9|1|A tariff surcharge may be added to this quotation in|Y
01|233817|9|2|the event of a sustained tariff increase on the|Y
01|233817|9|3|importation of this product.  Any surcharge will be|Y
01|233817|9|4|disclosed prior to acceptance of an order.|Y
01|233818|2|1|A tariff surcharge may be added to this quotation in|Y
01|233818|2|2|the event of a sustained tariff increase on the|Y
01|233818|2|3|importation of this product.  Any surcharge will be|Y
01|233818|2|4|disclosed prior to acceptance of an order.|Y
01|233819|2|1|A tariff surcharge may be added to this quotation in|Y
01|233819|2|2|the event of a sustained tariff increase on the|Y
01|233819|2|3|importation of this product.  Any surcharge will be|Y
01|233819|2|4|disclosed prior to acceptance of an order.|Y
01|233820|3|1|A tariff surcharge may be added to this quotation in|Y
01|233820|3|2|the event of a sustained tariff increase on the|Y
01|233820|3|3|importation of this product.  Any surcharge will be|Y
01|233820|3|4|disclosed prior to acceptance of an order.|Y
01|233821|1|1|INS Req'd:1011546/Orizon|Y
01|233821|2|1|INS Req'd:1011546/Orizon|Y
01|233821|3|1|INS Req'd:1011546/Orizon|Y
01|233821|4|1|A tariff surcharge may be added to this quotation in|Y
01|233821|4|2|the event of a sustained tariff increase on the|Y
01|233821|4|3|importation of this product.  Any surcharge will be|Y
01|233821|4|4|disclosed prior to acceptance of an order.|Y
01|233822|66|1|A tariff surcharge may be added to this quotation in|Y
01|233822|66|2|the event of a sustained tariff increase on the|Y
01|233822|66|3|importation of this product.  Any surcharge will be|Y
01|233822|66|4|disclosed prior to acceptance of an order.|Y
01|233823|1|1|The service includes an oil change and the oil will be|Y
01|233823|1|2|supplied by Suncall.|Y
01|233823|2|1|A tariff surcharge may be added to this quotation in|Y
01|233823|2|2|the event of a sustained tariff increase on the|Y
01|233823|2|3|importation of this product.  Any surcharge will be|Y
01|233823|2|4|disclosed prior to acceptance of an order.|Y
01|233825|40|1|A tariff surcharge may be added to this quotation in|Y
01|233825|40|2|the event of a sustained tariff increase on the|Y
01|233825|40|3|importation of this product.  Any surcharge will be|Y
01|233825|40|4|disclosed prior to acceptance of an order.|Y
01|233826|4|1|A tariff surcharge may be added to this quotation in|Y
01|233826|4|2|the event of a sustained tariff increase on the|Y
01|233826|4|3|importation of this product.  Any surcharge will be|Y
01|233826|4|4|disclosed prior to acceptance of an order.|Y
01|233827|2|1|A tariff surcharge may be added to this quotation in|Y
01|233827|2|2|the event of a sustained tariff increase on the|Y
01|233827|2|3|importation of this product.  Any surcharge will be|Y
01|233827|2|4|disclosed prior to acceptance of an order.|Y
01|233828|1|1|w/ PS-123-AIR installed at factory|Y
01|233828|2|1|Installed on NC5-46-SK6C-90 at factory|Y
01|233828|3|1|A tariff surcharge may be added to this quotation in|Y
01|233828|3|2|the event of a sustained tariff increase on the|Y
01|233828|3|3|importation of this product.  Any surcharge will be|Y
01|233828|3|4|disclosed prior to acceptance of an order.|Y
01|233829|2|1|A tariff surcharge may be added to this quotation in|Y
01|233829|2|2|the event of a sustained tariff increase on the|Y
01|233829|2|3|importation of this product.  Any surcharge will be|Y
01|233829|2|4|disclosed prior to acceptance of an order.|Y
01|233830|4|1|A tariff surcharge may be added to this quotation in|Y
01|233830|4|2|the event of a sustained tariff increase on the|Y
01|233830|4|3|importation of this product.  Any surcharge will be|Y
01|233830|4|4|disclosed prior to acceptance of an order.|Y
01|233831|3|1|A tariff surcharge may be added to this quotation in|Y
01|233831|3|2|the event of a sustained tariff increase on the|Y
01|233831|3|3|importation of this product.  Any surcharge will be|Y
01|233831|3|4|disclosed prior to acceptance of an order.|Y
01|233832|2|1|A tariff surcharge may be added to this quotation in|Y
01|233832|2|2|the event of a sustained tariff increase on the|Y
01|233832|2|3|importation of this product.  Any surcharge will be|Y
01|233832|2|4|disclosed prior to acceptance of an order.|Y
01|233833|4|1|A tariff surcharge may be added to this quotation in|Y
01|233833|4|2|the event of a sustained tariff increase on the|Y
01|233833|4|3|importation of this product.  Any surcharge will be|Y
01|233833|4|4|disclosed prior to acceptance of an order.|Y
01|233834|7|1|A tariff surcharge may be added to this quotation in|Y
01|233834|7|2|the event of a sustained tariff increase on the|Y
01|233834|7|3|importation of this product.  Any surcharge will be|Y
01|233834|7|4|disclosed prior to acceptance of an order.|Y
01|233835|10|1|HSK63A-MMC4-116-AA-RP|Y
01|233835|10|2|Quoted at NET pricing|Y
01|233835|10|3|Non-standard stock/non-cancellable non-returnable.|Y
01|233835|13|1|A tariff surcharge may be added to this quotation in|Y
01|233835|13|2|the event of a sustained tariff increase on the|Y
01|233835|13|3|importation of this product.  Any surcharge will be|Y
01|233835|13|4|disclosed prior to acceptance of an order.|Y
01|233836|2|1|A tariff surcharge may be added to this quotation in|Y
01|233836|2|2|the event of a sustained tariff increase on the|Y
01|233836|2|3|importation of this product.  Any surcharge will be|Y
01|233836|2|4|disclosed prior to acceptance of an order.|Y
01|233837|-13|1|A tariff surcharge may be added to this quotation in|Y
01|233837|-13|2|the event of a sustained tariff increase on the|Y
01|233837|-13|3|importation of this product.  Any surcharge will be|Y
01|233837|-13|4|disclosed prior to acceptance of an order.|Y
01|233838|2|1|A tariff surcharge may be added to this quotation in|Y
01|233838|2|2|the event of a sustained tariff increase on the|Y
01|233838|2|3|importation of this product.  Any surcharge will be|Y
01|233838|2|4|disclosed prior to acceptance of an order.|Y
01|233839|4|1|A tariff surcharge may be added to this quotation in|Y
01|233839|4|2|the event of a sustained tariff increase on the|Y
01|233839|4|3|importation of this product.  Any surcharge will be|Y
01|233839|4|4|disclosed prior to acceptance of an order.|Y
01|233840|2|1|A tariff surcharge may be added to this quotation in|Y
01|233840|2|2|the event of a sustained tariff increase on the|Y
01|233840|2|3|importation of this product.  Any surcharge will be|Y
01|233840|2|4|disclosed prior to acceptance of an order.|Y
01|233841|3|1|A tariff surcharge may be added to this quotation in|Y
01|233841|3|2|the event of a sustained tariff increase on the|Y
01|233841|3|3|importation of this product.  Any surcharge will be|Y
01|233841|3|4|disclosed prior to acceptance of an order.|Y
01|233842|3|1|A tariff surcharge may be added to this quotation in|Y
01|233842|3|2|the event of a sustained tariff increase on the|Y
01|233842|3|3|importation of this product.  Any surcharge will be|Y
01|233842|3|4|disclosed prior to acceptance of an order.|Y
01|233843|1|1|Mimatic Part # 195807 for Haas DS30|Y
01|233843|1|2|SPECIAL-LV-MI x 2 >>>> Net $8050.00/each|Y
01|233843|1|3|SPECIAL-LV-MI x 5 >>>> Net $6280.00/each|Y
01|233843|21|1|A tariff surcharge may be added to this quotation in|Y
01|233843|21|2|the event of a sustained tariff increase on the|Y
01|233843|21|3|importation of this product.  Any surcharge will be|Y
01|233843|21|4|disclosed prior to acceptance of an order.|Y
01|233844|2|1|A tariff surcharge may be added to this quotation in|Y
01|233844|2|2|the event of a sustained tariff increase on the|Y
01|233844|2|3|importation of this product.  Any surcharge will be|Y
01|233844|2|4|disclosed prior to acceptance of an order.|Y
01|233845|2|1|A tariff surcharge may be added to this quotation in|Y
01|233845|2|2|the event of a sustained tariff increase on the|Y
01|233845|2|3|importation of this product.  Any surcharge will be|Y
01|233845|2|4|disclosed prior to acceptance of an order.|Y
01|233846|1|1|TNKQ2506-0468 0006|Y
01|233846|2|1|A tariff surcharge may be added to this quotation in|Y
01|233846|2|2|the event of a sustained tariff increase on the|Y
01|233846|2|3|importation of this product.  Any surcharge will be|Y
01|233846|2|4|disclosed prior to acceptance of an order.|Y
01|233847|2|1|A tariff surcharge may be added to this quotation in|Y
01|233847|2|2|the event of a sustained tariff increase on the|Y
01|233847|2|3|importation of this product.  Any surcharge will be|Y
01|233847|2|4|disclosed prior to acceptance of an order.|Y
01|233848|3|1|A tariff surcharge may be added to this quotation in|Y
01|233848|3|2|the event of a sustained tariff increase on the|Y
01|233848|3|3|importation of this product.  Any surcharge will be|Y
01|233848|3|4|disclosed prior to acceptance of an order.|Y
01|233849|2|1|A tariff surcharge may be added to this quotation in|Y
01|233849|2|2|the event of a sustained tariff increase on the|Y
01|233849|2|3|importation of this product.  Any surcharge will be|Y
01|233849|2|4|disclosed prior to acceptance of an order.|Y
01|233850|-13|1|A tariff surcharge may be added to this quotation in|Y
01|233850|-13|2|the event of a sustained tariff increase on the|Y
01|233850|-13|3|importation of this product.  Any surcharge will be|Y
01|233850|-13|4|disclosed prior to acceptance of an order.|Y
01|233851|1|1|Table without motor and cable.|Y
01|233851|2|1|A tariff surcharge may be added to this quotation in|Y
01|233851|2|2|the event of a sustained tariff increase on the|Y
01|233851|2|3|importation of this product.  Any surcharge will be|Y
01|233851|2|4|disclosed prior to acceptance of an order.|Y
01|233852|11|1|A tariff surcharge may be added to this quotation in|Y
01|233852|11|2|the event of a sustained tariff increase on the|Y
01|233852|11|3|importation of this product.  Any surcharge will be|Y
01|233852|11|4|disclosed prior to acceptance of an order.|Y
01|233853|2|1|A tariff surcharge may be added to this quotation in|Y
01|233853|2|2|the event of a sustained tariff increase on the|Y
01|233853|2|3|importation of this product.  Any surcharge will be|Y
01|233853|2|4|disclosed prior to acceptance of an order.|Y
01|233854|3|1|A tariff surcharge may be added to this quotation in|Y
01|233854|3|2|the event of a sustained tariff increase on the|Y
01|233854|3|3|importation of this product.  Any surcharge will be|Y
01|233854|3|4|disclosed prior to acceptance of an order.|Y
01|233855|12|1|A tariff surcharge may be added to this quotation in|Y
01|233855|12|2|the event of a sustained tariff increase on the|Y
01|233855|12|3|importation of this product.  Any surcharge will be|Y
01|233855|12|4|disclosed prior to acceptance of an order.|Y
01|233856|4|1|A tariff surcharge may be added to this quotation in|Y
01|233856|4|2|the event of a sustained tariff increase on the|Y
01|233856|4|3|importation of this product.  Any surcharge will be|Y
01|233856|4|4|disclosed prior to acceptance of an order.|Y
01|233857|1|1|L/N: TBD|Y
01|233857|1|2|CNC Turning Machine Mazak MSY250 Hyper Quadrex 250|Y
01|233857|1|3|(16-stations) Slim line version|Y
01|233857|1|4|shaft VDI 40 DIN ISO 10889; drive length 90mm/SW 100mm|Y
01|233857|1|5|collet interface ER11 according DIN6499|Y
01|233857|1|6|(clamping dia 0.5 - 7.0mm); external collant supply via|Y
01|233857|1|7|coolant pipe; L1 = 158mm; direction of rotation|Y
01|233857|1|8|reversl (output is not input); gear ratio i = 1:2|Y
01|233857|1|9|max. torque rate M(max) = 10 Nm; max. spindle|Y
01|233857|1|10|revolution n1(max) = 3.750 rpm|Y
01|233857|2|1|A tariff surcharge may be added to this quotation in|Y
01|233857|2|2|the event of a sustained tariff increase on the|Y
01|233857|2|3|importation of this product.  Any surcharge will be|Y
01|233857|2|4|disclosed prior to acceptance of an order.|Y
01|233858|3|1|A tariff surcharge may be added to this quotation in|Y
01|233858|3|2|the event of a sustained tariff increase on the|Y
01|233858|3|3|importation of this product.  Any surcharge will be|Y
01|233858|3|4|disclosed prior to acceptance of an order.|Y
01|233859|1|1|RGA#TOR-61962/|Y
01|233859|1|2|Repair of PRE-E236PLUS-I40 s/n: 104022|Y
01|233859|3|1|A tariff surcharge may be added to this quotation in|Y
01|233859|3|2|the event of a sustained tariff increase on the|Y
01|233859|3|3|importation of this product.  Any surcharge will be|Y
01|233859|3|4|disclosed prior to acceptance of an order.|Y
01|233860|10|1|A tariff surcharge may be added to this quotation in|Y
01|233860|10|2|the event of a sustained tariff increase on the|Y
01|233860|10|3|importation of this product.  Any surcharge will be|Y
01|233860|10|4|disclosed prior to acceptance of an order.|Y
01|233861|2|1|A tariff surcharge may be added to this quotation in|Y
01|233861|2|2|the event of a sustained tariff increase on the|Y
01|233861|2|3|importation of this product.  Any surcharge will be|Y
01|233861|2|4|disclosed prior to acceptance of an order.|Y
01|233862|4|1|A tariff surcharge may be added to this quotation in|Y
01|233862|4|2|the event of a sustained tariff increase on the|Y
01|233862|4|3|importation of this product.  Any surcharge will be|Y
01|233862|4|4|disclosed prior to acceptance of an order.|Y
01|233863|6|1|A tariff surcharge may be added to this quotation in|Y
01|233863|6|2|the event of a sustained tariff increase on the|Y
01|233863|6|3|importation of this product.  Any surcharge will be|Y
01|233863|6|4|disclosed prior to acceptance of an order.|Y
01|233864|2|1|A tariff surcharge may be added to this quotation in|Y
01|233864|2|2|the event of a sustained tariff increase on the|Y
01|233864|2|3|importation of this product.  Any surcharge will be|Y
01|233864|2|4|disclosed prior to acceptance of an order.|Y
01|233865|3|1|A tariff surcharge may be added to this quotation in|Y
01|233865|3|2|the event of a sustained tariff increase on the|Y
01|233865|3|3|importation of this product.  Any surcharge will be|Y
01|233865|3|4|disclosed prior to acceptance of an order.|Y
01|233866|3|1|A tariff surcharge may be added to this quotation in|Y
01|233866|3|2|the event of a sustained tariff increase on the|Y
01|233866|3|3|importation of this product.  Any surcharge will be|Y
01|233866|3|4|disclosed prior to acceptance of an order.|Y
01|233867|-13|1|A tariff surcharge may be added to this quotation in|Y
01|233867|-13|2|the event of a sustained tariff increase on the|Y
01|233867|-13|3|importation of this product.  Any surcharge will be|Y
01|233867|-13|4|disclosed prior to acceptance of an order.|Y
01|233868|2|1|A tariff surcharge may be added to this quotation in|Y
01|233868|2|2|the event of a sustained tariff increase on the|Y
01|233868|2|3|importation of this product.  Any surcharge will be|Y
01|233868|2|4|disclosed prior to acceptance of an order.|Y
01|233869|2|1|A tariff surcharge may be added to this quotation in|Y
01|233869|2|2|the event of a sustained tariff increase on the|Y
01|233869|2|3|importation of this product.  Any surcharge will be|Y
01|233869|2|4|disclosed prior to acceptance of an order.|Y
01|233870|2|1|A tariff surcharge may be added to this quotation in|Y
01|233870|2|2|the event of a sustained tariff increase on the|Y
01|233870|2|3|importation of this product.  Any surcharge will be|Y
01|233870|2|4|disclosed prior to acceptance of an order.|Y
01|233871|71|1|This takes the place of TQW-200.|Y
01|233871|78|1|A tariff surcharge may be added to this quotation in|Y
01|233871|78|2|the event of a sustained tariff increase on the|Y
01|233871|78|3|importation of this product.  Any surcharge will be|Y
01|233871|78|4|disclosed prior to acceptance of an order.|Y
01|233872|3|1|A tariff surcharge may be added to this quotation in|Y
01|233872|3|2|the event of a sustained tariff increase on the|Y
01|233872|3|3|importation of this product.  Any surcharge will be|Y
01|233872|3|4|disclosed prior to acceptance of an order.|Y
01|233873|4|1|A tariff surcharge may be added to this quotation in|Y
01|233873|4|2|the event of a sustained tariff increase on the|Y
01|233873|4|3|importation of this product.  Any surcharge will be|Y
01|233873|4|4|disclosed prior to acceptance of an order.|Y
01|233874|1|1|This price is good for up to 10pcs. We only have 9pcs|Y
01|233874|1|2|in stock with 10pcs anticipated aprx 10/30/2025.|Y
01|233874|4|1|This item is considered a Special and once a PO is sent|Y
01|233874|4|2|to factory may not be canceled or returned.|Y
01|233874|4|3|FYI~ Boeing-Helena is already receiving this Milling|Y
01|233874|4|4|Chuck as NBT50-C2-115 slightly longer GL. Are you sure|Y
01|233874|4|5|you have the correct gauge length for the 2 Chuck on|Y
01|233874|4|6|this quote request?|Y
01|233874|5|1|A tariff surcharge may be added to this quotation in|Y
01|233874|5|2|the event of a sustained tariff increase on the|Y
01|233874|5|3|importation of this product.  Any surcharge will be|Y
01|233874|5|4|disclosed prior to acceptance of an order.|Y
01|233875|1|1|ETCHED WITH DN SOL|Y
01|233875|2|1|A tariff surcharge may be added to this quotation in|Y
01|233875|2|2|the event of a sustained tariff increase on the|Y
01|233875|2|3|importation of this product.  Any surcharge will be|Y
01|233875|2|4|disclosed prior to acceptance of an order.|Y
01|233876|4|1|A tariff surcharge may be added to this quotation in|Y
01|233876|4|2|the event of a sustained tariff increase on the|Y
01|233876|4|3|importation of this product.  Any surcharge will be|Y
01|233876|4|4|disclosed prior to acceptance of an order.|Y
01|233877|9|1|A tariff surcharge may be added to this quotation in|Y
01|233877|9|2|the event of a sustained tariff increase on the|Y
01|233877|9|3|importation of this product.  Any surcharge will be|Y
01|233877|9|4|disclosed prior to acceptance of an order.|Y
01|233878|1|1|RGA#LVR-61875/|Y
01|233878|1|2|Repair of MZQT47-ER32Z-MS-OFFC-3MP s/n:72074 01|Y
01|233878|1|3|(Mimatic#167955)|Y
01|233878|2|1|Bearings seals o-rings worn spindle and coolant|Y
01|233878|2|2|sealing threadring to be replaced|Y
01|233878|4|1|RGA#LVR-61875/|Y
01|233878|4|2|Repair of MZQT47-ER32Z-MS-OFFC-3MP s/n:72074 02|Y
01|233878|4|3|(Mimatic#167955)|Y
01|233878|5|1|Bearings seals o-rings worn spindle and coolant|Y
01|233878|5|2|sealing threadring to be replaced|Y
01|233878|7|1|RGA#LVR-61875/|Y
01|233878|7|2|Repair of MZQT47-ER32Z-MS-OFFC-3MP s/n:72074 03|Y
01|233878|7|3|(Mimatic#167955)|Y
01|233878|8|1|Bearings seals o-rings worn spindle and coolant|Y
01|233878|8|2|sealing threadring to be replaced|Y
01|233878|9|1|A tariff surcharge may be added to this quotation in|Y
01|233878|9|2|the event of a sustained tariff increase on the|Y
01|233878|9|3|importation of this product.  Any surcharge will be|Y
01|233878|9|4|disclosed prior to acceptance of an order.|Y
01|233879|5|1|A tariff surcharge may be added to this quotation in|Y
01|233879|5|2|the event of a sustained tariff increase on the|Y
01|233879|5|3|importation of this product.  Any surcharge will be|Y
01|233879|5|4|disclosed prior to acceptance of an order.|Y
01|233880|8|1|A tariff surcharge may be added to this quotation in|Y
01|233880|8|2|the event of a sustained tariff increase on the|Y
01|233880|8|3|importation of this product.  Any surcharge will be|Y
01|233880|8|4|disclosed prior to acceptance of an order.|Y
01|233881|5|1|LIVE TOOL - TOOLING CERTIFICATE|Y
01|233881|5|2|BMT65|Y
01|233881|6|1|A tariff surcharge may be added to this quotation in|Y
01|233881|6|2|the event of a sustained tariff increase on the|Y
01|233881|6|3|importation of this product.  Any surcharge will be|Y
01|233881|6|4|disclosed prior to acceptance of an order.|Y
01|233882|3|1|A tariff surcharge may be added to this quotation in|Y
01|233882|3|2|the event of a sustained tariff increase on the|Y
01|233882|3|3|importation of this product.  Any surcharge will be|Y
01|233882|3|4|disclosed prior to acceptance of an order.|Y
01|233883|4|1|A tariff surcharge may be added to this quotation in|Y
01|233883|4|2|the event of a sustained tariff increase on the|Y
01|233883|4|3|importation of this product.  Any surcharge will be|Y
01|233883|4|4|disclosed prior to acceptance of an order.|Y
01|233884|2|1|A tariff surcharge may be added to this quotation in|Y
01|233884|2|2|the event of a sustained tariff increase on the|Y
01|233884|2|3|importation of this product.  Any surcharge will be|Y
01|233884|2|4|disclosed prior to acceptance of an order.|Y
01|233885|2|1|A tariff surcharge may be added to this quotation in|Y
01|233885|2|2|the event of a sustained tariff increase on the|Y
01|233885|2|3|importation of this product.  Any surcharge will be|Y
01|233885|2|4|disclosed prior to acceptance of an order.|Y
01|233886|2|1|A tariff surcharge may be added to this quotation in|Y
01|233886|2|2|the event of a sustained tariff increase on the|Y
01|233886|2|3|importation of this product.  Any surcharge will be|Y
01|233886|2|4|disclosed prior to acceptance of an order.|Y
01|233887|2|1|A tariff surcharge may be added to this quotation in|Y
01|233887|2|2|the event of a sustained tariff increase on the|Y
01|233887|2|3|importation of this product.  Any surcharge will be|Y
01|233887|2|4|disclosed prior to acceptance of an order.|Y
01|233888|4|1|A tariff surcharge may be added to this quotation in|Y
01|233888|4|2|the event of a sustained tariff increase on the|Y
01|233888|4|3|importation of this product.  Any surcharge will be|Y
01|233888|4|4|disclosed prior to acceptance of an order.|Y
01|233889|14|1|A tariff surcharge may be added to this quotation in|Y
01|233889|14|2|the event of a sustained tariff increase on the|Y
01|233889|14|3|importation of this product.  Any surcharge will be|Y
01|233889|14|4|disclosed prior to acceptance of an order.|Y
01|233890|3|1|A tariff surcharge may be added to this quotation in|Y
01|233890|3|2|the event of a sustained tariff increase on the|Y
01|233890|3|3|importation of this product.  Any surcharge will be|Y
01|233890|3|4|disclosed prior to acceptance of an order.|Y
01|233891|11|1|A tariff surcharge may be added to this quotation in|Y
01|233891|11|2|the event of a sustained tariff increase on the|Y
01|233891|11|3|importation of this product.  Any surcharge will be|Y
01|233891|11|4|disclosed prior to acceptance of an order.|Y
01|233892|5|1|A tariff surcharge may be added to this quotation in|Y
01|233892|5|2|the event of a sustained tariff increase on the|Y
01|233892|5|3|importation of this product.  Any surcharge will be|Y
01|233892|5|4|disclosed prior to acceptance of an order.|Y
01|233893|2|1|A tariff surcharge may be added to this quotation in|Y
01|233893|2|2|the event of a sustained tariff increase on the|Y
01|233893|2|3|importation of this product.  Any surcharge will be|Y
01|233893|2|4|disclosed prior to acceptance of an order.|Y
01|233894|2|1|A tariff surcharge may be added to this quotation in|Y
01|233894|2|2|the event of a sustained tariff increase on the|Y
01|233894|2|3|importation of this product.  Any surcharge will be|Y
01|233894|2|4|disclosed prior to acceptance of an order.|Y
01|233895|39|1|A tariff surcharge may be added to this quotation in|Y
01|233895|39|2|the event of a sustained tariff increase on the|Y
01|233895|39|3|importation of this product.  Any surcharge will be|Y
01|233895|39|4|disclosed prior to acceptance of an order.|Y
01|233896|1|1|Mimimum Order Quantity is two (2) pieces NET Pricing.|Y
01|233896|1|2|C4001-16-50CP x 5 >>>> Net $80.00/each|Y
01|233896|3|1|A tariff surcharge may be added to this quotation in|Y
01|233896|3|2|the event of a sustained tariff increase on the|Y
01|233896|3|3|importation of this product.  Any surcharge will be|Y
01|233896|3|4|disclosed prior to acceptance of an order.|Y
01|233897|3|1|Please note additional 20% applied per overstock promo.|Y
01|233897|3|2|Once PO/order has been placed these can't be cancelled|Y
01|233897|3|3|or returned. These will need to be requoted upon stock|Y
01|233897|3|4|depletion.|Y
01|233897|4|1|A tariff surcharge may be added to this quotation in|Y
01|233897|4|2|the event of a sustained tariff increase on the|Y
01|233897|4|3|importation of this product.  Any surcharge will be|Y
01|233897|4|4|disclosed prior to acceptance of an order.|Y
01|233899|2|1|A tariff surcharge may be added to this quotation in|Y
01|233899|2|2|the event of a sustained tariff increase on the|Y
01|233899|2|3|importation of this product.  Any surcharge will be|Y
01|233899|2|4|disclosed prior to acceptance of an order.|Y
01|233900|4|1|A tariff surcharge may be added to this quotation in|Y
01|233900|4|2|the event of a sustained tariff increase on the|Y
01|233900|4|3|importation of this product.  Any surcharge will be|Y
01|233900|4|4|disclosed prior to acceptance of an order.|Y
01|233901|3|1|A tariff surcharge may be added to this quotation in|Y
01|233901|3|2|the event of a sustained tariff increase on the|Y
01|233901|3|3|importation of this product.  Any surcharge will be|Y
01|233901|3|4|disclosed prior to acceptance of an order.|Y
01|233902|2|1|A tariff surcharge may be added to this quotation in|Y
01|233902|2|2|the event of a sustained tariff increase on the|Y
01|233902|2|3|importation of this product.  Any surcharge will be|Y
01|233902|2|4|disclosed prior to acceptance of an order.|Y
01|233903|4|1|Delivery: 10pcs STOCK 5 pcs 3wks 6 pcs 5Wks Balance|Y
01|233903|4|2|11 Wks|Y
01|233903|7|1|A tariff surcharge may be added to this quotation in|Y
01|233903|7|2|the event of a sustained tariff increase on the|Y
01|233903|7|3|importation of this product.  Any surcharge will be|Y
01|233903|7|4|disclosed prior to acceptance of an order.|Y
01|233904|2|1|A tariff surcharge may be added to this quotation in|Y
01|233904|2|2|the event of a sustained tariff increase on the|Y
01|233904|2|3|importation of this product.  Any surcharge will be|Y
01|233904|2|4|disclosed prior to acceptance of an order.|Y
01|233905|2|1|A tariff surcharge may be added to this quotation in|Y
01|233905|2|2|the event of a sustained tariff increase on the|Y
01|233905|2|3|importation of this product.  Any surcharge will be|Y
01|233905|2|4|disclosed prior to acceptance of an order.|Y
01|233906|3|1|A tariff surcharge may be added to this quotation in|Y
01|233906|3|2|the event of a sustained tariff increase on the|Y
01|233906|3|3|importation of this product.  Any surcharge will be|Y
01|233906|3|4|disclosed prior to acceptance of an order.|Y
01|233907|3|1|A tariff surcharge may be added to this quotation in|Y
01|233907|3|2|the event of a sustained tariff increase on the|Y
01|233907|3|3|importation of this product.  Any surcharge will be|Y
01|233907|3|4|disclosed prior to acceptance of an order.|Y
01|233908|3|1|A tariff surcharge may be added to this quotation in|Y
01|233908|3|2|the event of a sustained tariff increase on the|Y
01|233908|3|3|importation of this product.  Any surcharge will be|Y
01|233908|3|4|disclosed prior to acceptance of an order.|Y
01|233909|2|1|A tariff surcharge may be added to this quotation in|Y
01|233909|2|2|the event of a sustained tariff increase on the|Y
01|233909|2|3|importation of this product.  Any surcharge will be|Y
01|233909|2|4|disclosed prior to acceptance of an order.|Y
01|233910|2|1|A tariff surcharge may be added to this quotation in|Y
01|233910|2|2|the event of a sustained tariff increase on the|Y
01|233910|2|3|importation of this product.  Any surcharge will be|Y
01|233910|2|4|disclosed prior to acceptance of an order.|Y
01|233911|1|1|RGA#LVR-61969/|Y
01|233911|1|2|Repair of BMT65-SK20Z-ICE s/n: 20905265 13|Y
01|233911|1|3|(Mimatic#192968)|Y
01|233911|2|1|Bearings seals and o-rings to be replaced.|Y
01|233911|3|1|A tariff surcharge may be added to this quotation in|Y
01|233911|3|2|the event of a sustained tariff increase on the|Y
01|233911|3|3|importation of this product.  Any surcharge will be|Y
01|233911|3|4|disclosed prior to acceptance of an order.|Y
01|233912|3|1|A tariff surcharge may be added to this quotation in|Y
01|233912|3|2|the event of a sustained tariff increase on the|Y
01|233912|3|3|importation of this product.  Any surcharge will be|Y
01|233912|3|4|disclosed prior to acceptance of an order.|Y
01|233913|3|1|A tariff surcharge may be added to this quotation in|Y
01|233913|3|2|the event of a sustained tariff increase on the|Y
01|233913|3|3|importation of this product.  Any surcharge will be|Y
01|233913|3|4|disclosed prior to acceptance of an order.|Y
01|233914|4|1|A tariff surcharge may be added to this quotation in|Y
01|233914|4|2|the event of a sustained tariff increase on the|Y
01|233914|4|3|importation of this product.  Any surcharge will be|Y
01|233914|4|4|disclosed prior to acceptance of an order.|Y
01|233915|9|1|A tariff surcharge may be added to this quotation in|Y
01|233915|9|2|the event of a sustained tariff increase on the|Y
01|233915|9|3|importation of this product.  Any surcharge will be|Y
01|233915|9|4|disclosed prior to acceptance of an order.|Y
01|233916|3|1|A tariff surcharge may be added to this quotation in|Y
01|233916|3|2|the event of a sustained tariff increase on the|Y
01|233916|3|3|importation of this product.  Any surcharge will be|Y
01|233916|3|4|disclosed prior to acceptance of an order.|Y
01|233917|3|1|A tariff surcharge may be added to this quotation in|Y
01|233917|3|2|the event of a sustained tariff increase on the|Y
01|233917|3|3|importation of this product.  Any surcharge will be|Y
01|233917|3|4|disclosed prior to acceptance of an order.|Y
01|233918|2|1|A tariff surcharge may be added to this quotation in|Y
01|233918|2|2|the event of a sustained tariff increase on the|Y
01|233918|2|3|importation of this product.  Any surcharge will be|Y
01|233918|2|4|disclosed prior to acceptance of an order.|Y
01|233919|5|1|A tariff surcharge may be added to this quotation in|Y
01|233919|5|2|the event of a sustained tariff increase on the|Y
01|233919|5|3|importation of this product.  Any surcharge will be|Y
01|233919|5|4|disclosed prior to acceptance of an order.|Y
01|233920|3|1|A tariff surcharge may be added to this quotation in|Y
01|233920|3|2|the event of a sustained tariff increase on the|Y
01|233920|3|3|importation of this product.  Any surcharge will be|Y
01|233920|3|4|disclosed prior to acceptance of an order.|Y
01|233921|5|1|A tariff surcharge may be added to this quotation in|Y
01|233921|5|2|the event of a sustained tariff increase on the|Y
01|233921|5|3|importation of this product.  Any surcharge will be|Y
01|233921|5|4|disclosed prior to acceptance of an order.|Y
01|233922|2|1|A tariff surcharge may be added to this quotation in|Y
01|233922|2|2|the event of a sustained tariff increase on the|Y
01|233922|2|3|importation of this product.  Any surcharge will be|Y
01|233922|2|4|disclosed prior to acceptance of an order.|Y
01|233923|11|1|A tariff surcharge may be added to this quotation in|Y
01|233923|11|2|the event of a sustained tariff increase on the|Y
01|233923|11|3|importation of this product.  Any surcharge will be|Y
01|233923|11|4|disclosed prior to acceptance of an order.|Y
01|233924|2|1|A tariff surcharge may be added to this quotation in|Y
01|233924|2|2|the event of a sustained tariff increase on the|Y
01|233924|2|3|importation of this product.  Any surcharge will be|Y
01|233924|2|4|disclosed prior to acceptance of an order.|Y
01|233925|2|1|A tariff surcharge may be added to this quotation in|Y
01|233925|2|2|the event of a sustained tariff increase on the|Y
01|233925|2|3|importation of this product.  Any surcharge will be|Y
01|233925|2|4|disclosed prior to acceptance of an order.|Y
01|233926|2|1|A tariff surcharge may be added to this quotation in|Y
01|233926|2|2|the event of a sustained tariff increase on the|Y
01|233926|2|3|importation of this product.  Any surcharge will be|Y
01|233926|2|4|disclosed prior to acceptance of an order.|Y
01|233927|2|1|A tariff surcharge may be added to this quotation in|Y
01|233927|2|2|the event of a sustained tariff increase on the|Y
01|233927|2|3|importation of this product.  Any surcharge will be|Y
01|233927|2|4|disclosed prior to acceptance of an order.|Y
01|233928|2|1|A tariff surcharge may be added to this quotation in|Y
01|233928|2|2|the event of a sustained tariff increase on the|Y
01|233928|2|3|importation of this product.  Any surcharge will be|Y
01|233928|2|4|disclosed prior to acceptance of an order.|Y
01|233929|11|1|A tariff surcharge may be added to this quotation in|Y
01|233929|11|2|the event of a sustained tariff increase on the|Y
01|233929|11|3|importation of this product.  Any surcharge will be|Y
01|233929|11|4|disclosed prior to acceptance of an order.|Y
01|233930|9|1|A tariff surcharge may be added to this quotation in|Y
01|233930|9|2|the event of a sustained tariff increase on the|Y
01|233930|9|3|importation of this product.  Any surcharge will be|Y
01|233930|9|4|disclosed prior to acceptance of an order.|Y
01|233931|3|1|A tariff surcharge may be added to this quotation in|Y
01|233931|3|2|the event of a sustained tariff increase on the|Y
01|233931|3|3|importation of this product.  Any surcharge will be|Y
01|233931|3|4|disclosed prior to acceptance of an order.|Y
01|233932|2|1|A tariff surcharge may be added to this quotation in|Y
01|233932|2|2|the event of a sustained tariff increase on the|Y
01|233932|2|3|importation of this product.  Any surcharge will be|Y
01|233932|2|4|disclosed prior to acceptance of an order.|Y
01|233933|2|1|A tariff surcharge may be added to this quotation in|Y
01|233933|2|2|the event of a sustained tariff increase on the|Y
01|233933|2|3|importation of this product.  Any surcharge will be|Y
01|233933|2|4|disclosed prior to acceptance of an order.|Y
01|233934|2|1|A tariff surcharge may be added to this quotation in|Y
01|233934|2|2|the event of a sustained tariff increase on the|Y
01|233934|2|3|importation of this product.  Any surcharge will be|Y
01|233934|2|4|disclosed prior to acceptance of an order.|Y
01|233935|2|1|A tariff surcharge may be added to this quotation in|Y
01|233935|2|2|the event of a sustained tariff increase on the|Y
01|233935|2|3|importation of this product.  Any surcharge will be|Y
01|233935|2|4|disclosed prior to acceptance of an order.|Y
01|233936|5|1|A tariff surcharge may be added to this quotation in|Y
01|233936|5|2|the event of a sustained tariff increase on the|Y
01|233936|5|3|importation of this product.  Any surcharge will be|Y
01|233936|5|4|disclosed prior to acceptance of an order|Y
01|233937|4|1|A tariff surcharge may be added to this quotation in|Y
01|233937|4|2|the event of a sustained tariff increase on the|Y
01|233937|4|3|importation of this product.  Any surcharge will be|Y
01|233937|4|4|disclosed prior to acceptance of an order.|Y
01|233938|8|1|A tariff surcharge may be added to this quotation in|Y
01|233938|8|2|the event of a sustained tariff increase on the|Y
01|233938|8|3|importation of this product.  Any surcharge will be|Y
01|233938|8|4|disclosed prior to acceptance of an order.|Y
01|233939|6|1|A tariff surcharge may be added to this quotation in|Y
01|233939|6|2|the event of a sustained tariff increase on the|Y
01|233939|6|3|importation of this product.  Any surcharge will be|Y
01|233939|6|4|disclosed prior to acceptance of an order.|Y
01|233940|17|1|A tariff surcharge may be added to this quotation in|Y
01|233940|17|2|the event of a sustained tariff increase on the|Y
01|233940|17|3|importation of this product.  Any surcharge will be|Y
01|233940|17|4|disclosed prior to acceptance of an order.|Y
01|233941|2|1|A tariff surcharge may be added to this quotation in|Y
01|233941|2|2|the event of a sustained tariff increase on the|Y
01|233941|2|3|importation of this product.  Any surcharge will be|Y
01|233941|2|4|disclosed prior to acceptance of an order.|Y
01|233942|2|1|A tariff surcharge may be added to this quotation in|Y
01|233942|2|2|the event of a sustained tariff increase on the|Y
01|233942|2|3|importation of this product.  Any surcharge will be|Y
01|233942|2|4|disclosed prior to acceptance of an order.|Y
01|233943|2|1|A tariff surcharge may be added to this quotation in|Y
01|233943|2|2|the event of a sustained tariff increase on the|Y
01|233943|2|3|importation of this product.  Any surcharge will be|Y
01|233943|2|4|disclosed prior to acceptance of an order.|Y
01|233944|2|1|A tariff surcharge may be added to this quotation in|Y
01|233944|2|2|the event of a sustained tariff increase on the|Y
01|233944|2|3|importation of this product.  Any surcharge will be|Y
01|233944|2|4|disclosed prior to acceptance of an order.|Y
01|233945|11|1|A tariff surcharge may be added to this quotation in|Y
01|233945|11|2|the event of a sustained tariff increase on the|Y
01|233945|11|3|importation of this product.  Any surcharge will be|Y
01|233945|11|4|disclosed prior to acceptance of an order|Y
01|233946|4|1|Stock at Factory.  If placing an order by 6/25|Y
01|233946|4|2|estimated delivery is mid/end of July.|Y
01|233946|7|1|A tariff surcharge may be added to this quotation in|Y
01|233946|7|2|the event of a sustained tariff increase on the|Y
01|233946|7|3|importation of this product.  Any surcharge will be|Y
01|233946|7|4|disclosed prior to acceptance of an order.|Y
01|233947|2|1|A tariff surcharge may be added to this quotation in|Y
01|233947|2|2|the event of a sustained tariff increase on the|Y
01|233947|2|3|importation of this product.  Any surcharge will be|Y
01|233947|2|4|disclosed prior to acceptance of an order.|Y
01|233948|3|1|A tariff surcharge may be added to this quotation in|Y
01|233948|3|2|the event of a sustained tariff increase on the|Y
01|233948|3|3|importation of this product.  Any surcharge will be|Y
01|233948|3|4|disclosed prior to acceptance of an order.|Y
01|233949|2|1|A tariff surcharge may be added to this quotation in|Y
01|233949|2|2|the event of a sustained tariff increase on the|Y
01|233949|2|3|importation of this product.  Any surcharge will be|Y
01|233949|2|4|disclosed prior to acceptance of an order.|Y
01|233950|2|1|Please note additional 20% applied per overstock promo.|Y
01|233950|2|2|Once PO/order has been issued these can't be cancelled|Y
01|233950|2|3|or returned. This will need to be requoted upon stock|Y
01|233950|2|4|depletion.|Y
01|233950|5|1|Please note additional 20% applied per overstock promo.|Y
01|233950|5|2|Once PO/order has been issued these can't be cancelled|Y
01|233950|5|3|or returned. This will need to be requoted upon stock|Y
01|233950|5|4|depletion.|Y
01|233950|16|1|A tariff surcharge may be added to this quotation in|Y
01|233950|16|2|the event of a sustained tariff increase on the|Y
01|233950|16|3|importation of this product.  Any surcharge will be|Y
01|233950|16|4|disclosed prior to acceptance of an order.|Y
01|233951|2|1|A tariff surcharge may be added to this quotation in|Y
01|233951|2|2|the event of a sustained tariff increase on the|Y
01|233951|2|3|importation of this product.  Any surcharge will be|Y
01|233951|2|4|disclosed prior to acceptance of an order.|Y
01|233953|5|1|A tariff surcharge may be added to this quotation in|Y
01|233953|5|2|the event of a sustained tariff increase on the|Y
01|233953|5|3|importation of this product.  Any surcharge will be|Y
01|233953|5|4|disclosed prior to acceptance of an order.|Y
01|233954|2|1|A tariff surcharge may be added to this quotation in|Y
01|233954|2|2|the event of a sustained tariff increase on the|Y
01|233954|2|3|importation of this product.  Any surcharge will be|Y
01|233954|2|4|disclosed prior to acceptance of an order.|Y
01|233955|2|1|A tariff surcharge may be added to this quotation in|Y
01|233955|2|2|the event of a sustained tariff increase on the|Y
01|233955|2|3|importation of this product.  Any surcharge will be|Y
01|233955|2|4|disclosed prior to acceptance of an order.|Y
01|233956|8|1|A tariff surcharge may be added to this quotation in|Y
01|233956|8|2|the event of a sustained tariff increase on the|Y
01|233956|8|3|importation of this product.  Any surcharge will be|Y
01|233956|8|4|disclosed prior to acceptance of an order.|Y
01|233957|2|1|A tariff surcharge may be added to this quotation in|Y
01|233957|2|2|the event of a sustained tariff increase on the|Y
01|233957|2|3|importation of this product.  Any surcharge will be|Y
01|233957|2|4|disclosed prior to acceptance of an order.|Y
01|233958|11|1|A tariff surcharge may be added to this quotation in|Y
01|233958|11|2|the event of a sustained tariff increase on the|Y
01|233958|11|3|importation of this product.  Any surcharge will be|Y
01|233958|11|4|disclosed prior to acceptance of an order.|Y
01|233959|11|1|A tariff surcharge may be added to this quotation in|Y
01|233959|11|2|the event of a sustained tariff increase on the|Y
01|233959|11|3|importation of this product.  Any surcharge will be|Y
01|233959|11|4|disclosed prior to acceptance of an order.|Y
01|233960|13|1|A tariff surcharge may be added to this quotation in|Y
01|233960|13|2|the event of a sustained tariff increase on the|Y
01|233960|13|3|importation of this product.  Any surcharge will be|Y
01|233960|13|4|disclosed prior to acceptance of an order.|Y
01|233961|1|1|No Drive Key|Y
01|233961|2|1|With Drive Pin|Y
01|233961|3|1|Non-Returnable|Y
01|233961|4|1|A tariff surcharge may be added to this quotation in|Y
01|233961|4|2|the event of a sustained tariff increase on the|Y
01|233961|4|3|importation of this product.  Any surcharge will be|Y
01|233961|4|4|disclosed prior to acceptance of an order.|Y
01|233962|2|1|A tariff surcharge may be added to this quotation in|Y
01|233962|2|2|the event of a sustained tariff increase on the|Y
01|233962|2|3|importation of this product.  Any surcharge will be|Y
01|233962|2|4|disclosed prior to acceptance of an order.|Y
01|233963|2|1|A tariff surcharge may be added to this quotation in|Y
01|233963|2|2|the event of a sustained tariff increase on the|Y
01|233963|2|3|importation of this product.  Any surcharge will be|Y
01|233963|2|4|disclosed prior to acceptance of an order.|Y
01|233964|2|1|A tariff surcharge may be added to this quotation in|Y
01|233964|2|2|the event of a sustained tariff increase on the|Y
01|233964|2|3|importation of this product.  Any surcharge will be|Y
01|233964|2|4|disclosed prior to acceptance of an order.|Y
01|233965|3|1|A tariff surcharge may be added to this quotation in|Y
01|233965|3|2|the event of a sustained tariff increase on the|Y
01|233965|3|3|importation of this product.  Any surcharge will be|Y
01|233965|3|4|disclosed prior to acceptance of an order.|Y
01|233966|4|1|A tariff surcharge may be added to this quotation in|Y
01|233966|4|2|the event of a sustained tariff increase on the|Y
01|233966|4|3|importation of this product.  Any surcharge will be|Y
01|233966|4|4|disclosed prior to acceptance of an order.|Y
01|233967|3|1|A tariff surcharge may be added to this quotation in|Y
01|233967|3|2|the event of a sustained tariff increase on the|Y
01|233967|3|3|importation of this product.  Any surcharge will be|Y
01|233967|3|4|disclosed prior to acceptance of an order.|Y
01|233968|2|1|A tariff surcharge may be added to this quotation in|Y
01|233968|2|2|the event of a sustained tariff increase on the|Y
01|233968|2|3|importation of this product.  Any surcharge will be|Y
01|233968|2|4|disclosed prior to acceptance of an order.|Y
01|233969|3|1|A tariff surcharge may be added to this quotation in|Y
01|233969|3|2|the event of a sustained tariff increase on the|Y
01|233969|3|3|importation of this product.  Any surcharge will be|Y
01|233969|3|4|disclosed prior to acceptance of an order.|Y
01|233970|2|1|A tariff surcharge may be added to this quotation in|Y
01|233970|2|2|the event of a sustained tariff increase on the|Y
01|233970|2|3|importation of this product.  Any surcharge will be|Y
01|233970|2|4|disclosed prior to acceptance of an order.|Y
01|233971|30|1|A tariff surcharge may be added to this quotation in|Y
01|233971|30|2|the event of a sustained tariff increase on the|Y
01|233971|30|3|importation of this product.  Any surcharge will be|Y
01|233971|30|4|disclosed prior to acceptance of an order.|Y
01|233972|3|1|A tariff surcharge may be added to this quotation in|Y
01|233972|3|2|the event of a sustained tariff increase on the|Y
01|233972|3|3|importation of this product.  Any surcharge will be|Y
01|233972|3|4|disclosed prior to acceptance of an order.|Y
01|233973|2|1|Discount reflects tooling on our Overstock list.|Y
01|233973|2|2|Extra 20% added and item is non-returnable.|Y
01|233973|5|1|T00228 / Mori BMT40 Static OD20mm X<Radial>STRT|Y
01|233973|5|2|MainSub 1+1 Short External Coolant 62x70mm|Y
01|233973|6|1|T00224/ Mori BMT40 Static OD20mm X<Radial>STRT|Y
01|233973|6|2|Short Version ExtCool 62x70mm|Y
01|233973|14|1|A tariff surcharge may be added to this quotation in|Y
01|233973|14|2|the event of a sustained tariff increase on the|Y
01|233973|14|3|importation of this product.  Any surcharge will be|Y
01|233973|14|4|disclosed prior to acceptance of an order.|Y
01|233974|4|1|A tariff surcharge may be added to this quotation in|Y
01|233974|4|2|the event of a sustained tariff increase on the|Y
01|233974|4|3|importation of this product.  Any surcharge will be|Y
01|233974|4|4|disclosed prior to acceptance of an order.|Y
01|233975|2|1|A tariff surcharge may be added to this quotation in|Y
01|233975|2|2|the event of a sustained tariff increase on the|Y
01|233975|2|3|importation of this product.  Any surcharge will be|Y
01|233975|2|4|disclosed prior to acceptance of an order.|Y
01|233976|7|1|A tariff surcharge may be added to this quotation in|Y
01|233976|7|2|the event of a sustained tariff increase on the|Y
01|233976|7|3|importation of this product.  Any surcharge will be|Y
01|233976|7|4|disclosed prior to acceptance of an order.|Y
01|233978|2|1|A tariff surcharge may be added to this quotation in|Y
01|233978|2|2|the event of a sustained tariff increase on the|Y
01|233978|2|3|importation of this product.  Any surcharge will be|Y
01|233978|2|4|disclosed prior to acceptance of an order.|Y
01|233979|2|1|A tariff surcharge may be added to this quotation in|Y
01|233979|2|2|the event of a sustained tariff increase on the|Y
01|233979|2|3|importation of this product.  Any surcharge will be|Y
01|233979|2|4|disclosed prior to acceptance of an order.|Y
01|233980|1|1|Lead Time 4~6 Business Days After Receipt of Order|Y
01|233980|1|2|CAT50 End Mill Holder 42mm DIN_Mod 10K|Y
01|233980|1|3|Item #:  C5006-42-4.50DIN-M|Y
01|233980|8|1|A tariff surcharge may be added to this quotation in|Y
01|233980|8|2|the event of a sustained tariff increase on the|Y
01|233980|8|3|importation of this product.  Any surcharge will be|Y
01|233980|8|4|disclosed prior to acceptance of an order.|Y
01|233981|5|1|A tariff surcharge may be added to this quotation in|Y
01|233981|5|2|the event of a sustained tariff increase on the|Y
01|233981|5|3|importation of this product.  Any surcharge will be|Y
01|233981|5|4|disclosed prior to acceptance of an order.|Y
01|233982|14|1|A tariff surcharge may be added to this quotation in|Y
01|233982|14|2|the event of a sustained tariff increase on the|Y
01|233982|14|3|importation of this product.  Any surcharge will be|Y
01|233982|14|4|disclosed prior to acceptance of an order.|Y
01|233983|2|1|A tariff surcharge may be added to this quotation in|Y
01|233983|2|2|the event of a sustained tariff increase on the|Y
01|233983|2|3|importation of this product.  Any surcharge will be|Y
01|233983|2|4|disclosed prior to acceptance of an order.|Y
01|233984|4|1|A tariff surcharge may be added to this quotation in|Y
01|233984|4|2|the event of a sustained tariff increase on the|Y
01|233984|4|3|importation of this product.  Any surcharge will be|Y
01|233984|4|4|disclosed prior to acceptance of an order.|Y
01|233985|4|1|A tariff surcharge may be added to this quotation in|Y
01|233985|4|2|the event of a sustained tariff increase on the|Y
01|233985|4|3|importation of this product.  Any surcharge will be|Y
01|233985|4|4|disclosed prior to acceptance of an order.|Y
01|233986|3|1|A tariff surcharge may be added to this quotation in|Y
01|233986|3|2|the event of a sustained tariff increase on the|Y
01|233986|3|3|importation of this product.  Any surcharge will be|Y
01|233986|3|4|disclosed prior to acceptance of an order.|Y
01|233987|4|1|A tariff surcharge may be added to this quotation in|Y
01|233987|4|2|the event of a sustained tariff increase on the|Y
01|233987|4|3|importation of this product.  Any surcharge will be|Y
01|233987|4|4|disclosed prior to acceptance of an order.|Y
01|233988|2|1|A tariff surcharge may be added to this quotation in|Y
01|233988|2|2|the event of a sustained tariff increase on the|Y
01|233988|2|3|importation of this product.  Any surcharge will be|Y
01|233988|2|4|disclosed prior to acceptance of an order.|Y
01|233989|3|1|A tariff surcharge may be added to this quotation in|Y
01|233989|3|2|the event of a sustained tariff increase on the|Y
01|233989|3|3|importation of this product.  Any surcharge will be|Y
01|233989|3|4|disclosed prior to acceptance of an order.|Y
01|233990|6|1|A tariff surcharge may be added to this quotation in|Y
01|233990|6|2|the event of a sustained tariff increase on the|Y
01|233990|6|3|importation of this product.  Any surcharge will be|Y
01|233990|6|4|disclosed prior to acceptance of an order.|Y
01|233991|2|1|A tariff surcharge may be added to this quotation in|Y
01|233991|2|2|the event of a sustained tariff increase on the|Y
01|233991|2|3|importation of this product.  Any surcharge will be|Y
01|233991|2|4|disclosed prior to acceptance of an order.|Y
01|233992|2|1|A tariff surcharge may be added to this quotation in|Y
01|233992|2|2|the event of a sustained tariff increase on the|Y
01|233992|2|3|importation of this product.  Any surcharge will be|Y
01|233992|2|4|disclosed prior to acceptance of an order.|Y
01|233993|2|1|A tariff surcharge may be added to this quotation in|Y
01|233993|2|2|the event of a sustained tariff increase on the|Y
01|233993|2|3|importation of this product.  Any surcharge will be|Y
01|233993|2|4|disclosed prior to acceptance of an order.|Y
01|233994|3|1|A tariff surcharge may be added to this quotation in|Y
01|233994|3|2|the event of a sustained tariff increase on the|Y
01|233994|3|3|importation of this product.  Any surcharge will be|Y
01|233994|3|4|disclosed prior to acceptance of an order.|Y
01|233995|2|1|A tariff surcharge may be added to this quotation in|Y
01|233995|2|2|the event of a sustained tariff increase on the|Y
01|233995|2|3|importation of this product.  Any surcharge will be|Y
01|233995|2|4|disclosed prior to acceptance of an order.|Y
01|233996|3|1|A tariff surcharge may be added to this quotation in|Y
01|233996|3|2|the event of a sustained tariff increase on the|Y
01|233996|3|3|importation of this product.  Any surcharge will be|Y
01|233996|3|4|disclosed prior to acceptance of an order.|Y
01|233997|5|1|A tariff surcharge may be added to this quotation in|Y
01|233997|5|2|the event of a sustained tariff increase on the|Y
01|233997|5|3|importation of this product.  Any surcharge will be|Y
01|233997|5|4|disclosed prior to acceptance of an order.|Y
01|233998|1|1|FOR CNCZ180 SN: 28098T|Y
01|233998|2|1|A tariff surcharge may be added to this quotation in|Y
01|233998|2|2|the event of a sustained tariff increase on the|Y
01|233998|2|3|importation of this product.  Any surcharge will be|Y
01|233998|2|4|disclosed prior to acceptance of an order.|Y
01|233999|6|1|A tariff surcharge may be added to this quotation in|Y
01|233999|6|2|the event of a sustained tariff increase on the|Y
01|233999|6|3|importation of this product.  Any surcharge will be|Y
01|233999|6|4|disclosed prior to acceptance of an order.|Y
01|234000|2|1|A tariff surcharge may be added to this quotation in|Y
01|234000|2|2|the event of a sustained tariff increase on the|Y
01|234000|2|3|importation of this product.  Any surcharge will be|Y
01|234000|2|4|disclosed prior to acceptance of an order.|Y
01|234001|1|1|TQW-150 is taking the place of the TQW-200.|Y
01|234001|4|1|A tariff surcharge may be added to this quotation in|Y
01|234001|4|2|the event of a sustained tariff increase on the|Y
01|234001|4|3|importation of this product.  Any surcharge will be|Y
01|234001|4|4|disclosed prior to acceptance of an order.|Y
01|234002|5|1|A tariff surcharge may be added to this quotation in|Y
01|234002|5|2|the event of a sustained tariff increase on the|Y
01|234002|5|3|importation of this product.  Any surcharge will be|Y
01|234002|5|4|disclosed prior to acceptance of an order.|Y
01|234003|2|1|A tariff surcharge may be added to this quotation in|Y
01|234003|2|2|the event of a sustained tariff increase on the|Y
01|234003|2|3|importation of this product.  Any surcharge will be|Y
01|234003|2|4|disclosed prior to acceptance of an order.|Y
01|234004|7|1|A tariff surcharge may be added to this quotation in|Y
01|234004|7|2|the event of a sustained tariff increase on the|Y
01|234004|7|3|importation of this product.  Any surcharge will be|Y
01|234004|7|4|disclosed prior to acceptance of an order.|Y
01|234005|3|1|A tariff surcharge may be added to this quotation in|Y
01|234005|3|2|the event of a sustained tariff increase on the|Y
01|234005|3|3|importation of this product.  Any surcharge will be|Y
01|234005|3|4|disclosed prior to acceptance of an order.|Y
01|234006|3|1|Includes: Drive unit short bar fiber optic cable|Y
01|234006|3|2|communications cable bulhead cables external cables|Y
01|234006|3|3|service time and travel.|Y
01|234006|4|1|A tariff surcharge may be added to this quotation in|Y
01|234006|4|2|the event of a sustained tariff increase on the|Y
01|234006|4|3|importation of this product.  Any surcharge will be|Y
01|234006|4|4|disclosed prior to acceptance of an order.|Y
01|234007|3|1|A tariff surcharge may be added to this quotation in|Y
01|234007|3|2|the event of a sustained tariff increase on the|Y
01|234007|3|3|importation of this product.  Any surcharge will be|Y
01|234007|3|4|disclosed prior to acceptance of an order.|Y
01|234008|2|1|A tariff surcharge may be added to this quotation in|Y
01|234008|2|2|the event of a sustained tariff increase on the|Y
01|234008|2|3|importation of this product.  Any surcharge will be|Y
01|234008|2|4|disclosed prior to acceptance of an order.|Y
01|234009|4|1|A tariff surcharge may be added to this quotation in|Y
01|234009|4|2|the event of a sustained tariff increase on the|Y
01|234009|4|3|importation of this product.  Any surcharge will be|Y
01|234009|4|4|disclosed prior to acceptance of an order.|Y
01|234010|3|1|A tariff surcharge may be added to this quotation in|Y
01|234010|3|2|the event of a sustained tariff increase on the|Y
01|234010|3|3|importation of this product.  Any surcharge will be|Y
01|234010|3|4|disclosed prior to acceptance of an order.|Y
01|234011|2|1|Smooth bearing nut wll be swapped with E20-NUT-S|Y
01|234011|2|2|Part# NC4007-0020-4.00SN|Y
01|234011|4|1|Smooth bearing nut wll be swapped with E32-NUT-S|Y
01|234011|4|2|Part# NC4007-0032-3.13SN|Y
01|234012|1|1|RGA#TAR-62010|Y
01|234012|1|2|CNC260FA-M SN:6433|Y
01|234012|8|1|A tariff surcharge may be added to this quotation in|Y
01|234012|8|2|the event of a sustained tariff increase on the|Y
01|234012|8|3|importation of this product.  Any surcharge will be|Y
01|234012|8|4|disclosed prior to acceptance of an order.|Y
01|234013|2|1|A tariff surcharge may be added to this quotation in|Y
01|234013|2|2|the event of a sustained tariff increase on the|Y
01|234013|2|3|importation of this product.  Any surcharge will be|Y
01|234013|2|4|disclosed prior to acceptance of an order.|Y
01|234014|2|1|A tariff surcharge may be added to this quotation in|Y
01|234014|2|2|the event of a sustained tariff increase on the|Y
01|234014|2|3|importation of this product.  Any surcharge will be|Y
01|234014|2|4|disclosed prior to acceptance of an order.|Y
01|234015|2|1|A tariff surcharge may be added to this quotation in|Y
01|234015|2|2|the event of a sustained tariff increase on the|Y
01|234015|2|3|importation of this product.  Any surcharge will be|Y
01|234015|2|4|disclosed prior to acceptance of an order.|Y
01|234016|2|1|A tariff surcharge may be added to this quotation in|Y
01|234016|2|2|the event of a sustained tariff increase on the|Y
01|234016|2|3|importation of this product.  Any surcharge will be|Y
01|234016|2|4|disclosed prior to acceptance of an order.|Y
01|234017|1|1|BT40-C12-65G|Y
01|234017|1|2|Quoted at NET pricing|Y
01|234017|1|3|Non-returnable/non-cancellable|Y
01|234017|8|1|A tariff surcharge may be added to this quotation in|Y
01|234017|8|2|the event of a sustained tariff increase on the|Y
01|234017|8|3|importation of this product.  Any surcharge will be|Y
01|234017|8|4|disclosed prior to acceptance of an order.|Y
01|234018|5|1|A tariff surcharge may be added to this quotation in|Y
01|234018|5|2|the event of a sustained tariff increase on the|Y
01|234018|5|3|importation of this product.  Any surcharge will be|Y
01|234018|5|4|disclosed prior to acceptance of an order.|Y
01|234019|11|1|A tariff surcharge may be added to this quotation in|Y
01|234019|11|2|the event of a sustained tariff increase on the|Y
01|234019|11|3|importation of this product.  Any surcharge will be|Y
01|234019|11|4|disclosed prior to acceptance of an order.|Y
01|234020|1|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|234020|2|1|Req.INS/Install E16-NUT & ER16-SCREW(S)|Y
01|234020|3|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|234020|4|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|234020|5|1|Req.INS/Install S7/16-20X3/8|Y
01|234020|6|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|234020|7|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|234020|8|1|Req.INS/Check INSTLD SPLY Key & Arbor Screw|Y
01|234020|9|1|Req.INS/OD Groove frange Dia issue|Y
01|234020|10|1|Req.INS/OD Groove frange Dia issue|Y
01|234020|11|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|234020|12|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|234020|13|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|234020|14|1|A tariff surcharge may be added to this quotation in|Y
01|234020|14|2|the event of a sustained tariff increase on the|Y
01|234020|14|3|importation of this product.  Any surcharge will be|Y
01|234020|14|4|disclosed prior to acceptance of an order.|Y
01|234021|3|1|A tariff surcharge may be added to this quotation in|Y
01|234021|3|2|the event of a sustained tariff increase on the|Y
01|234021|3|3|importation of this product.  Any surcharge will be|Y
01|234021|3|4|disclosed prior to acceptance of an order.|Y
01|234022|2|1|A tariff surcharge may be added to this quotation in|Y
01|234022|2|2|the event of a sustained tariff increase on the|Y
01|234022|2|3|importation of this product.  Any surcharge will be|Y
01|234022|2|4|disclosed prior to acceptance of an order.|Y
01|234023|12|1|A tariff surcharge may be added to this quotation in|Y
01|234023|12|2|the event of a sustained tariff increase on the|Y
01|234023|12|3|importation of this product.  Any surcharge will be|Y
01|234023|12|4|disclosed prior to acceptance of an order.|Y
01|234024|2|1|A tariff surcharge may be added to this quotation in|Y
01|234024|2|2|the event of a sustained tariff increase on the|Y
01|234024|2|3|importation of this product.  Any surcharge will be|Y
01|234024|2|4|disclosed prior to acceptance of an order.|Y
01|234025|3|1|A tariff surcharge may be added to this quotation in|Y
01|234025|3|2|the event of a sustained tariff increase on the|Y
01|234025|3|3|importation of this product.  Any surcharge will be|Y
01|234025|3|4|disclosed prior to acceptance of an order.|Y
01|234026|12|1|A tariff surcharge may be added to this quotation in|Y
01|234026|12|2|the event of a sustained tariff increase on the|Y
01|234026|12|3|importation of this product.  Any surcharge will be|Y
01|234026|12|4|disclosed prior to acceptance of an order.|Y
01|234027|11|1|A tariff surcharge may be added to this quotation in|Y
01|234027|11|2|the event of a sustained tariff increase on the|Y
01|234027|11|3|importation of this product.  Any surcharge will be|Y
01|234027|11|4|disclosed prior to acceptance of an order.|Y
01|234028|2|1|A tariff surcharge may be added to this quotation in|Y
01|234028|2|2|the event of a sustained tariff increase on the|Y
01|234028|2|3|importation of this product.  Any surcharge will be|Y
01|234028|2|4|disclosed prior to acceptance of an order.|Y
01|234030|4|1|A tariff surcharge may be added to this quotation in|Y
01|234030|4|2|the event of a sustained tariff increase on the|Y
01|234030|4|3|importation of this product.  Any surcharge will be|Y
01|234030|4|4|disclosed prior to acceptance of an order.|Y
01|234031|3|1|A tariff surcharge may be added to this quotation in|Y
01|234031|3|2|the event of a sustained tariff increase on the|Y
01|234031|3|3|importation of this product.  Any surcharge will be|Y
01|234031|3|4|disclosed prior to acceptance of an order.|Y
01|234032|2|1|A tariff surcharge may be added to this quotation in|Y
01|234032|2|2|the event of a sustained tariff increase on the|Y
01|234032|2|3|importation of this product.  Any surcharge will be|Y
01|234032|2|4|disclosed prior to acceptance of an order.|Y
01|234033|3|1|A tariff surcharge may be added to this quotation in|Y
01|234033|3|2|the event of a sustained tariff increase on the|Y
01|234033|3|3|importation of this product.  Any surcharge will be|Y
01|234033|3|4|disclosed prior to acceptance of an order.|Y
01|234034|1|1|Howa part # ORC63x1200-M-L|Y
01|234034|1|2|Howa Rodless Cylinder - Item NET Weight: 20kg (44 LBS)|Y
01|234034|1|3|This item is considered special once ordered it cannot|Y
01|234034|1|4|be cancelled or returned.|Y
01|234034|2|1|A tariff surcharge may be added to this quotation in|Y
01|234034|2|2|the event of a sustained tariff increase on the|Y
01|234034|2|3|importation of this product.  Any surcharge will be|Y
01|234034|2|4|disclosed prior to acceptance of an order.|Y
01|234035|3|1|A tariff surcharge may be added to this quotation in|Y
01|234035|3|2|the event of a sustained tariff increase on the|Y
01|234035|3|3|importation of this product.  Any surcharge will be|Y
01|234035|3|4|disclosed prior to acceptance of an order.|Y
01|234036|2|1|A tariff surcharge may be added to this quotation in|Y
01|234036|2|2|the event of a sustained tariff increase on the|Y
01|234036|2|3|importation of this product.  Any surcharge will be|Y
01|234036|2|4|disclosed prior to acceptance of an order.|Y
01|234037|8|1|A tariff surcharge may be added to this quotation in|Y
01|234037|8|2|the event of a sustained tariff increase on the|Y
01|234037|8|3|importation of this product.  Any surcharge will be|Y
01|234037|8|4|disclosed prior to acceptance of an order.|Y
01|234038|3|1|A tariff surcharge may be added to this quotation in|Y
01|234038|3|2|the event of a sustained tariff increase on the|Y
01|234038|3|3|importation of this product.  Any surcharge will be|Y
01|234038|3|4|disclosed prior to acceptance of an order.|Y
01|234039|2|1|A tariff surcharge may be added to this quotation in|Y
01|234039|2|2|the event of a sustained tariff increase on the|Y
01|234039|2|3|importation of this product.  Any surcharge will be|Y
01|234039|2|4|disclosed prior to acceptance of an order.|Y
01|234040|2|1|Riser needed to match the center height of the table|Y
01|234040|11|1|A tariff surcharge may be added to this quotation in|Y
01|234040|11|2|the event of a sustained tariff increase on the|Y
01|234040|11|3|importation of this product.  Any surcharge will be|Y
01|234040|11|4|disclosed prior to acceptance of an order.|Y
01|234041|3|1|A tariff surcharge may be added to this quotation in|Y
01|234041|3|2|the event of a sustained tariff increase on the|Y
01|234041|3|3|importation of this product.  Any surcharge will be|Y
01|234041|3|4|disclosed prior to acceptance of an order.|Y
01|234042|5|1|A tariff surcharge may be added to this quotation in|Y
01|234042|5|2|the event of a sustained tariff increase on the|Y
01|234042|5|3|importation of this product.  Any surcharge will be|Y
01|234042|5|4|disclosed prior to acceptance of an order.|Y
01|234043|2|1|A tariff surcharge may be added to this quotation in|Y
01|234043|2|2|the event of a sustained tariff increase on the|Y
01|234043|2|3|importation of this product.  Any surcharge will be|Y
01|234043|2|4|disclosed prior to acceptance of an order.|Y
01|234044|3|1|A tariff surcharge may be added to this quotation in|Y
01|234044|3|2|the event of a sustained tariff increase on the|Y
01|234044|3|3|importation of this product.  Any surcharge will be|Y
01|234044|3|4|disclosed prior to acceptance of an order.|Y
01|234045|2|1|A tariff surcharge may be added to this quotation in|Y
01|234045|2|2|the event of a sustained tariff increase on the|Y
01|234045|2|3|importation of this product.  Any surcharge will be|Y
01|234045|2|4|disclosed prior to acceptance of an order.|Y
01|234046|13|1|A tariff surcharge may be added to this quotation in|Y
01|234046|13|2|the event of a sustained tariff increase on the|Y
01|234046|13|3|importation of this product.  Any surcharge will be|Y
01|234046|13|4|disclosed prior to acceptance of an order.|Y
01|234047|2|1|A tariff surcharge may be added to this quotation in|Y
01|234047|2|2|the event of a sustained tariff increase on the|Y
01|234047|2|3|importation of this product.  Any surcharge will be|Y
01|234047|2|4|disclosed prior to acceptance of an order.|Y
01|234048|11|1|A tariff surcharge may be added to this quotation in|Y
01|234048|11|2|the event of a sustained tariff increase on the|Y
01|234048|11|3|importation of this product.  Any surcharge will be|Y
01|234048|11|4|disclosed prior to acceptance of an order.|Y
01|234049|2|1|A tariff surcharge may be added to this quotation in|Y
01|234049|2|2|the event of a sustained tariff increase on the|Y
01|234049|2|3|importation of this product.  Any surcharge will be|Y
01|234049|2|4|disclosed prior to acceptance of an order.|Y
01|234050|13|1|A tariff surcharge may be added to this quotation in|Y
01|234050|13|2|the event of a sustained tariff increase on the|Y
01|234050|13|3|importation of this product.  Any surcharge will be|Y
01|234050|13|4|disclosed prior to acceptance of an order.|Y
01|234051|2|1|A tariff surcharge may be added to this quotation in|Y
01|234051|2|2|the event of a sustained tariff increase on the|Y
01|234051|2|3|importation of this product.  Any surcharge will be|Y
01|234051|2|4|disclosed prior to acceptance of an order.|Y
01|234052|5|1|A tariff surcharge may be added to this quotation in|Y
01|234052|5|2|the event of a sustained tariff increase on the|Y
01|234052|5|3|importation of this product.  Any surcharge will be|Y
01|234052|5|4|disclosed prior to acceptance of an order.|Y
01|234054|7|1|A tariff surcharge may be added to this quotation in|Y
01|234054|7|2|the event of a sustained tariff increase on the|Y
01|234054|7|3|importation of this product.  Any surcharge will be|Y
01|234054|7|4|disclosed prior to acceptance of an order.|Y
01|234055|9|1|A tariff surcharge may be added to this quotation in|Y
01|234055|9|2|the event of a sustained tariff increase on the|Y
01|234055|9|3|importation of this product.  Any surcharge will be|Y
01|234055|9|4|disclosed prior to acceptance of an order.|Y
01|234057|2|1|A tariff surcharge may be added to this quotation in|Y
01|234057|2|2|the event of a sustained tariff increase on the|Y
01|234057|2|3|importation of this product.  Any surcharge will be|Y
01|234057|2|4|disclosed prior to acceptance of an order.|Y
01|234058|3|1|A tariff surcharge may be added to this quotation in|Y
01|234058|3|2|the event of a sustained tariff increase on the|Y
01|234058|3|3|importation of this product.  Any surcharge will be|Y
01|234058|3|4|disclosed prior to acceptance of an order.|Y
01|234059|1|1|Part Number: TBD   **NET PRICE**|Y
01|234059|1|2|VDI50 ER32 Output External Coolant direction|Y
01|234059|1|3|of rotation is reversal 1:1 Gear Ratio max 70 bar|Y
01|234059|1|4|coolant pressure 50Nm max torque 6k max RPM|Y
01|234059|1|5|L1 appro. 203.5|Y
01|234059|2|1|2 piece pricing of Live Tool on Line 1.|Y
01|234059|5|1|Part Number: TBD **NET Price**|Y
01|234059|5|2|VDI50 MI50 Quick Change External Coolant direction|Y
01|234059|5|3|of rotation is reversal 1:1 Gear Ratio max 70 bar|Y
01|234059|5|4|coolant pressure 50Nm max torque 6k max RPM|Y
01|234059|5|5|L1 aprrox. 203.5|Y
01|234059|5|6|**MI Insert must be ordered separately**|Y
01|234059|6|1|2 piece pricing of Live Tool on Line 3.|Y
01|234059|15|1|A tariff surcharge may be added to this quotation in|Y
01|234059|15|2|the event of a sustained tariff increase on the|Y
01|234059|15|3|importation of this product.  Any surcharge will be|Y
01|234059|15|4|disclosed prior to acceptance of an order.|Y
01|234060|-13|1|A tariff surcharge may be added to this quotation in|Y
01|234060|-13|2|the event of a sustained tariff increase on the|Y
01|234060|-13|3|importation of this product.  Any surcharge will be|Y
01|234060|-13|4|disclosed prior to acceptance of an order.|Y
01|234061|3|1|A tariff surcharge may be added to this quotation in|Y
01|234061|3|2|the event of a sustained tariff increase on the|Y
01|234061|3|3|importation of this product.  Any surcharge will be|Y
01|234061|3|4|disclosed prior to acceptance of an order.|Y
01|234062|1|1|Please note we currently have 9 pieces in stock.|Y
01|234062|2|1|A tariff surcharge may be added to this quotation in|Y
01|234062|2|2|the event of a sustained tariff increase on the|Y
01|234062|2|3|importation of this product.  Any surcharge will be|Y
01|234062|2|4|disclosed prior to acceptance of an order.|Y
01|234063|3|1|A tariff surcharge may be added to this quotation in|Y
01|234063|3|2|the event of a sustained tariff increase on the|Y
01|234063|3|3|importation of this product.  Any surcharge will be|Y
01|234063|3|4|disclosed prior to acceptance of an order.|Y
01|234064|4|1|180MM X 180MM x 25MM|Y
01|234064|5|1|A tariff surcharge may be added to this quotation in|Y
01|234064|5|2|the event of a sustained tariff increase on the|Y
01|234064|5|3|importation of this product.  Any surcharge will be|Y
01|234064|5|4|disclosed prior to acceptance of an order.|Y
01|234065|7|1|A tariff surcharge may be added to this quotation in|Y
01|234065|7|2|the event of a sustained tariff increase on the|Y
01|234065|7|3|importation of this product.  Any surcharge will be|Y
01|234065|7|4|disclosed prior to acceptance of an order.|Y
01|234066|9|1|A tariff surcharge may be added to this quotation in|Y
01|234066|9|2|the event of a sustained tariff increase on the|Y
01|234066|9|3|importation of this product.  Any surcharge will be|Y
01|234066|9|4|disclosed prior to acceptance of an order.|Y
01|234067|1|1|5AX-201YA-M-AB SN:6416|Y
01|234067|5|1|A tariff surcharge may be added to this quotation in|Y
01|234067|5|2|the event of a sustained tariff increase on the|Y
01|234067|5|3|importation of this product.  Any surcharge will be|Y
01|234067|5|4|disclosed prior to acceptance of an order.|Y
01|234068|2|1|A tariff surcharge may be added to this quotation in|Y
01|234068|2|2|the event of a sustained tariff increase on the|Y
01|234068|2|3|importation of this product.  Any surcharge will be|Y
01|234068|2|4|disclosed prior to acceptance of an order.|Y
01|234069|6|1|A tariff surcharge may be added to this quotation in|Y
01|234069|6|2|the event of a sustained tariff increase on the|Y
01|234069|6|3|importation of this product.  Any surcharge will be|Y
01|234069|6|4|disclosed prior to acceptance of an order.|Y
01|234070|5|1|A tariff surcharge may be added to this quotation in|Y
01|234070|5|2|the event of a sustained tariff increase on the|Y
01|234070|5|3|importation of this product.  Any surcharge will be|Y
01|234070|5|4|disclosed prior to acceptance of an order.|Y
01|234071|3|1|A tariff surcharge may be added to this quotation in|Y
01|234071|3|2|the event of a sustained tariff increase on the|Y
01|234071|3|3|importation of this product.  Any surcharge will be|Y
01|234071|3|4|disclosed prior to acceptance of an order.|Y
01|234072|2|1|Includes: Drive unitshort bar fiber optic cable|Y
01|234072|2|2|communications cable axis expansion card  bulkhead|Y
01|234072|2|3|cables external cables  service time and travel.|Y
01|234072|3|1|A tariff surcharge may be added to this quotation in|Y
01|234072|3|2|the event of a sustained tariff increase on the|Y
01|234072|3|3|importation of this product.  Any surcharge will be|Y
01|234072|3|4|disclosed prior to acceptance of an order.|Y
01|234073|13|1|A tariff surcharge may be added to this quotation in|Y
01|234073|13|2|the event of a sustained tariff increase on the|Y
01|234073|13|3|importation of this product.  Any surcharge will be|Y
01|234073|13|4|disclosed prior to acceptance of an order.|Y
01|234074|2|1|A tariff surcharge may be added to this quotation in|Y
01|234074|2|2|the event of a sustained tariff increase on the|Y
01|234074|2|3|importation of this product.  Any surcharge will be|Y
01|234074|2|4|disclosed prior to acceptance of an order.|Y
01|234075|1|1|Part Number: TBD similar to MZMP47-ER32X-OFF-HS but|Y
01|234075|1|2|ER25 Mimatic#191188|Y
01|234075|1|3|Delivery:|Y
01|234075|1|4|1 pc: 2-4 Weeks 2-3 pcs: 4-6 weeks|Y
01|234075|1|5|Quantity Breaks:|Y
01|234075|1|6|1-2 pcs: $3459.00/EA|Y
01|234075|1|7|3+ pcs: $3168.00/EA|Y
01|234075|2|1|A tariff surcharge may be added to this quotation in|Y
01|234075|2|2|the event of a sustained tariff increase on the|Y
01|234075|2|3|importation of this product.  Any surcharge will be|Y
01|234075|2|4|disclosed prior to acceptance of an order.|Y
01|234076|2|1|A tariff surcharge may be added to this quotation in|Y
01|234076|2|2|the event of a sustained tariff increase on the|Y
01|234076|2|3|importation of this product.  Any surcharge will be|Y
01|234076|2|4|disclosed prior to acceptance of an order.|Y
01|234077|35|1|A tariff surcharge may be added to this quotation in|Y
01|234077|35|2|the event of a sustained tariff increase on the|Y
01|234077|35|3|importation of this product.  Any surcharge will be|Y
01|234077|35|4|disclosed prior to acceptance of an order.|Y
01|234078|2|1|A tariff surcharge may be added to this quotation in|Y
01|234078|2|2|the event of a sustained tariff increase on the|Y
01|234078|2|3|importation of this product.  Any surcharge will be|Y
01|234078|2|4|disclosed prior to acceptance of an order.|Y
01|234079|10|1|A tariff surcharge may be added to this quotation in|Y
01|234079|10|2|the event of a sustained tariff increase on the|Y
01|234079|10|3|importation of this product.  Any surcharge will be|Y
01|234079|10|4|disclosed prior to acceptance of an order.|Y
01|234080|2|1|A tariff surcharge may be added to this quotation in|Y
01|234080|2|2|the event of a sustained tariff increase on the|Y
01|234080|2|3|importation of this product.  Any surcharge will be|Y
01|234080|2|4|disclosed prior to acceptance of an order.|Y
01|234081|1|1|Part Number: NC5-46-SK16C-90P|Y
01|234081|1|2|NC5-46 Slim Chuck SK16 Coolant HiSpeed 15K|Y
01|234081|4|1|A tariff surcharge may be added to this quotation in|Y
01|234081|4|2|the event of a sustained tariff increase on the|Y
01|234081|4|3|importation of this product.  Any surcharge will be|Y
01|234081|4|4|disclosed prior to acceptance of an order.|Y
01|234082|3|1|A tariff surcharge may be added to this quotation in|Y
01|234082|3|2|the event of a sustained tariff increase on the|Y
01|234082|3|3|importation of this product.  Any surcharge will be|Y
01|234082|3|4|disclosed prior to acceptance of an order.|Y
01|234083|4|1|A tariff surcharge may be added to this quotation in|Y
01|234083|4|2|the event of a sustained tariff increase on the|Y
01|234083|4|3|importation of this product.  Any surcharge will be|Y
01|234083|4|4|disclosed prior to acceptance of an order.|Y
01|234084|3|1|A tariff surcharge may be added to this quotation in|Y
01|234084|3|2|the event of a sustained tariff increase on the|Y
01|234084|3|3|importation of this product.  Any surcharge will be|Y
01|234084|3|4|disclosed prior to acceptance of an order.|Y
01|234085|2|1|A tariff surcharge may be added to this quotation in|Y
01|234085|2|2|the event of a sustained tariff increase on the|Y
01|234085|2|3|importation of this product.  Any surcharge will be|Y
01|234085|2|4|disclosed prior to acceptance of an order.|Y
01|234086|2|1|Please note additional 20% applied per overstock promo.|Y
01|234086|2|2|Once PO/order is issued these can't be cancelled or|Y
01|234086|2|3|returned. This will need to be requoted upon stock|Y
01|234086|2|4|depletion.|Y
01|234086|4|1|A tariff surcharge may be added to this quotation in|Y
01|234086|4|2|the event of a sustained tariff increase on the|Y
01|234086|4|3|importation of this product.  Any surcharge will be|Y
01|234086|4|4|disclosed prior to acceptance of an order.|Y
01|234087|6|1|A tariff surcharge may be added to this quotation in|Y
01|234087|6|2|the event of a sustained tariff increase on the|Y
01|234087|6|3|importation of this product.  Any surcharge will be|Y
01|234087|6|4|disclosed prior to acceptance of an order.|Y
01|234088|19|1|A tariff surcharge may be added to this quotation in|Y
01|234088|19|2|the event of a sustained tariff increase on the|Y
01|234088|19|3|importation of this product.  Any surcharge will be|Y
01|234088|19|4|disclosed prior to acceptance of an order.|Y
01|234089|2|1|A tariff surcharge may be added to this quotation in|Y
01|234089|2|2|the event of a sustained tariff increase on the|Y
01|234089|2|3|importation of this product.  Any surcharge will be|Y
01|234089|2|4|disclosed prior to acceptance of an order.|Y
01|234090|2|1|A tariff surcharge may be added to this quotation in|Y
01|234090|2|2|the event of a sustained tariff increase on the|Y
01|234090|2|3|importation of this product.  Any surcharge will be|Y
01|234090|2|4|disclosed prior to acceptance of an order.|Y
01|234091|2|1|A tariff surcharge may be added to this quotation in|Y
01|234091|2|2|the event of a sustained tariff increase on the|Y
01|234091|2|3|importation of this product.  Any surcharge will be|Y
01|234091|2|4|disclosed prior to acceptance of an order.|Y
01|234092|1|1|**NET Price includes cost of holder BIS-C-122-04/L|Y
01|234092|1|2|and chip install/rebalance fee.|Y
01|234092|2|1|**NET Price includes chip BIS-C-122-04/L and install/|Y
01|234092|2|2|rebalance fee.|Y
01|234092|2|3|**Customer to provide SECO CAT50ADB-SM1.500-2.250-L1|Y
01|234092|2|4|holder for installation.|Y
01|234092|3|1|A tariff surcharge may be added to this quotation in|Y
01|234092|3|2|the event of a sustained tariff increase on the|Y
01|234092|3|3|importation of this product.  Any surcharge will be|Y
01|234092|3|4|disclosed prior to acceptance of an order.|Y
01|234093|3|1|A tariff surcharge may be added to this quotation in|Y
01|234093|3|2|the event of a sustained tariff increase on the|Y
01|234093|3|3|importation of this product.  Any surcharge will be|Y
01|234093|3|4|disclosed prior to acceptance of an order.|Y
01|234094|4|1|A tariff surcharge may be added to this quotation in|Y
01|234094|4|2|the event of a sustained tariff increase on the|Y
01|234094|4|3|importation of this product.  Any surcharge will be|Y
01|234094|4|4|disclosed prior to acceptance of an order.|Y
01|234095|2|1|A tariff surcharge may be added to this quotation in|Y
01|234095|2|2|the event of a sustained tariff increase on the|Y
01|234095|2|3|importation of this product.  Any surcharge will be|Y
01|234095|2|4|xisclosed prior to acceptance of an order.|Y
01|234096|12|1|A tariff surcharge may be added to this quotation in|Y
01|234096|12|2|the event of a sustained tariff increase on the|Y
01|234096|12|3|importation of this product.  Any surcharge will be|Y
01|234096|12|4|disclosed prior to acceptance of an order.|Y
01|234098|3|1|A tariff surcharge may be added to this quotation in|Y
01|234098|3|2|the event of a sustained tariff increase on the|Y
01|234098|3|3|importation of this product.  Any surcharge will be|Y
01|234098|3|4|disclosed prior to acceptance of an order.|Y
01|234099|2|1|A tariff surcharge may be added to this quotation in|Y
01|234099|2|2|the event of a sustained tariff increase on the|Y
01|234099|2|3|importation of this product.  Any surcharge will be|Y
01|234099|2|4|disclosed prior to acceptance of an order.|Y
01|234100|2|1|A tariff surcharge may be added to this quotation in|Y
01|234100|2|2|the event of a sustained tariff increase on the|Y
01|234100|2|3|importation of this product.  Any surcharge will be|Y
01|234100|2|4|disclosed prior to acceptance of an order.|Y
01|234102|2|1|A tariff surcharge may be added to this quotation in|Y
01|234102|2|2|the event of a sustained tariff increase on the|Y
01|234102|2|3|importation of this product.  Any surcharge will be|Y
01|234102|2|4|disclosed prior to acceptance of an order.|Y
01|234103|2|1|A tariff surcharge may be added to this quotation in|Y
01|234103|2|2|the event of a sustained tariff increase on the|Y
01|234103|2|3|importation of this product.  Any surcharge will be|Y
01|234103|2|4|disclosed prior to acceptance of an order.|Y
01|234104|13|1|A tariff surcharge may be added to this quotation in|Y
01|234104|13|2|the event of a sustained tariff increase on the|Y
01|234104|13|3|importation of this product.  Any surcharge will be|Y
01|234104|13|4|disclosed prior to acceptance of an order.|Y
01|234105|2|1|A tariff surcharge may be added to this quotation in|Y
01|234105|2|2|the event of a sustained tariff increase on the|Y
01|234105|2|3|importation of this product.  Any surcharge will be|Y
01|234105|2|4|disclosed prior to acceptance of an order.|Y
01|234106|9|1|A tariff surcharge may be added to this quotation in|Y
01|234106|9|2|the event of a sustained tariff increase on the|Y
01|234106|9|3|importation of this product.  Any surcharge will be|Y
01|234106|9|4|disclosed prior to acceptance of an order.|Y
01|234107|2|1|Please note these are non-standard stock and considered|Y
01|234107|2|2|specials. Once PO/order has been issued items cannot|Y
01|234107|2|3|be cancelled or returned.|Y
01|234107|5|1|A tariff surcharge may be added to this quotation in|Y
01|234107|5|2|the event of a sustained tariff increase on the|Y
01|234107|5|3|importation of this product.  Any surcharge will be|Y
01|234107|5|4|disclosed prior to acceptance of an order.|Y
01|234108|2|1|A tariff surcharge may be added to this quotation in|Y
01|234108|2|2|the event of a sustained tariff increase on the|Y
01|234108|2|3|importation of this product.  Any surcharge will be|Y
01|234108|2|4|disclosed prior to acceptance of an order.|Y
01|234109|4|1|A tariff surcharge may be added to this quotation in|Y
01|234109|4|2|the event of a sustained tariff increase on the|Y
01|234109|4|3|importation of this product.  Any surcharge will be|Y
01|234109|4|4|disclosed prior to acceptance of an order.|Y
01|234110|7|1|A tariff surcharge may be added to this quotation in|Y
01|234110|7|2|the event of a sustained tariff increase on the|Y
01|234110|7|3|importation of this product.  Any surcharge will be|Y
01|234110|7|4|disclosed prior to acceptance of an order.|Y
01|234111|2|1|A tariff surcharge may be added to this quotation in|Y
01|234111|2|2|the event of a sustained tariff increase on the|Y
01|234111|2|3|importation of this product.  Any surcharge will be|Y
01|234111|2|4|disclosed prior to acceptance of an order.|Y
01|234112|4|1|A tariff surcharge may be added to this quotation in|Y
01|234112|4|2|the event of a sustained tariff increase on the|Y
01|234112|4|3|importation of this product.  Any surcharge will be|Y
01|234112|4|4|disclosed prior to acceptance of an order.|Y
01|234113|10|1|A tariff surcharge may be added to this quotation in|Y
01|234113|10|2|the event of a sustained tariff increase on the|Y
01|234113|10|3|importation of this product.  Any surcharge will be|Y
01|234113|10|4|disclosed prior to acceptance of an order.|Y
01|234114|2|1|A tariff surcharge may be added to this quotation in|Y
01|234114|2|2|the event of a sustained tariff increase on the|Y
01|234114|2|3|importation of this product.  Any surcharge will be|Y
01|234114|2|4|disclosed prior to acceptance of an order.|Y
01|234115|3|1|A tariff surcharge may be added to this quotation in|Y
01|234115|3|2|the event of a sustained tariff increase on the|Y
01|234115|3|3|importation of this product.  Any surcharge will be|Y
01|234115|3|4|disclosed prior to acceptance of an order.|Y
01|234116|2|1|A tariff surcharge may be added to this quotation in|Y
01|234116|2|2|the event of a sustained tariff increase on the|Y
01|234116|2|3|importation of this product.  Any surcharge will be|Y
01|234116|2|4|disclosed prior to acceptance of an order.|Y
01|234117|2|1|A tariff surcharge may be added to this quotation in|Y
01|234117|2|2|the event of a sustained tariff increase on the|Y
01|234117|2|3|importation of this product.  Any surcharge will be|Y
01|234117|2|4|disclosed prior to acceptance of an order.|Y
01|234118|1|1|Shank HSK100A complete with Standard-Torque-Arm per|Y
01|234118|1|2|ISO 9524 and locking mechanism(without machine specific|Y
01|234118|1|3|stopblock).  Adjustment by customer-side to the|Y
01|234118|1|4|machining center. A=80mm/d=20mm/SW18. Tooling interface|Y
01|234118|1|5|for ABS32 no coolant supply. Angular head 360 degrees|Y
01|234118|1|6|adjustable(4x90 degree positioning). Reversal direction|Y
01|234118|1|7|of rotation. L=190mm gear ratio: i(n1/n2)=1:1. Max|Y
01|234118|1|8|torque M(max)=30Nm max revolution n1(max)=8000 RPM|Y
01|234118|1|9|n2(max)=8000rpm.|Y
01|234118|5|2|Shaft HSK100A according DIN69893-A. Complete with|Y
01|234118|5|3|standard-torque-arm per ISO9524 & locking mechanism|Y
01|234118|5|4|(w/o machine specific stop block)Adjustment by customer|Y
01|234118|5|5|side to the machining center.A=80mm/d=20mm/SW18.Tooling|Y
01|234118|5|6|interface for collet system ER32.(Diameter 30-200mm)|Y
01|234118|5|7|according to DIN6499no coolant supply reversal of|Y
01|234118|5|8|rotation direction!Input is reversal to output.L=295mm/|Y
01|234118|5|9|L1=100mm angular head 360 adjustablegear ratio:|Y
01|234118|5|10|i(n1/n2)=1:1max torque M(max)=70Nmmax ingoing rev.|Y
01|234118|9|1|Shaft HSK100 according DIN698930A complete w/ Standard|Y
01|234118|9|1|SAPA Print #'s: 0184 0186 0188 0190 0194 0196.|Y
01|234118|9|2|torque-arm per ISO 9524 & locking mechanism (w/o|Y
01|234118|9|2|Mimatic # 105499|Y
01|234118|9|3|machine specific stop block) adjust by customer-side|Y
01|234118|9|4|to the machining center.A=80mm/d=20mm/SW18. Tooling|Y
01|234118|9|5|interface for collect system ER25.(Diam 2.0-16.0mm)|Y
01|234118|9|6|according to DIN6499no coolant supplyreversal of|Y
01|234118|9|7|rotation direction! Input is reversal to outputL=190mm|Y
01|234118|9|8|L1=75mmangular head 360 adjustgear ratio:i(n1/n2)=|Y
01|234118|9|9|1:1max torque M(max)=30Nmmax ingoing revolution n1|Y
01|234118|9|10|(max)=8000RPMmax outgoing rev n2(max)=8000 RPM.|Y
01|234118|20|1|Shaft HSK100 acc DIN69893-Acomplete w/ standard torque|Y
01|234118|20|1|SAPA Print #'s: 0192 & 0192_2.  Mimatic # 172644|Y
01|234118|20|2|arm per ISO9524 & locking mechanism(w/o machine|Y
01|234118|20|3|specific stop block).Adjustment by customer side to the|Y
01|234118|20|4|machining center.A=80mm/d=20mm/SW18tooling interface|Y
01|234118|20|5|for mi-40 Quick Change System(mi-inset must be ordered|Y
01|234118|20|6|separately)no coolant supplyreversal of rotation|Y
01|234118|20|7|direction!Input is reversal to outputL=190mm/L1=75mm|Y
01|234118|20|8|angular head 360 adjustablegear ratio:i(n1/n2)=1:1|Y
01|234118|20|9|max torque M(max)=30Nmmax ingoing rev n1(max)=8000RPM|Y
01|234118|20|10|& max outgoing revolution n2(max) = 8000RPM.|Y
01|234118|25|1|Lead time is 3~5 days after design is confirmed.|Y
01|234118|27|1|A tariff surcharge may be added to this quotation in|Y
01|234118|27|2|the event of a sustained tariff increase on the|Y
01|234118|27|3|importation of this product.  Any surcharge will be|Y
01|234118|27|4|disclosed prior to acceptance of an order.|Y
01|234119|8|1|A tariff surcharge may be added to this quotation in|Y
01|234119|8|2|the event of a sustained tariff increase on the|Y
01|234119|8|3|importation of this product.  Any surcharge will be|Y
01|234119|8|4|disclosed prior to acceptance of an order.|Y
01|234120|2|1|A tariff surcharge may be added to this quotation in|Y
01|234120|2|2|the event of a sustained tariff increase on the|Y
01|234120|2|3|importation of this product.  Any surcharge will be|Y
01|234120|2|4|disclosed prior to acceptance of an order.|Y
01|234121|7|1|A tariff surcharge may be added to this quotation in|Y
01|234121|7|2|the event of a sustained tariff increase on the|Y
01|234121|7|3|importation of this product.  Any surcharge will be|Y
01|234121|7|4|disclosed prior to acceptance of an order.|Y
01|234122|26|1|A tariff surcharge may be added to this quotation in|Y
01|234122|26|2|the event of a sustained tariff increase on the|Y
01|234122|26|3|importation of this product.  Any surcharge will be|Y
01|234122|26|4|disclosed prior to acceptance of an order.|Y
01|234123|2|1|A tariff surcharge may be added to this quotation in|Y
01|234123|2|2|the event of a sustained tariff increase on the|Y
01|234123|2|3|importation of this product.  Any surcharge will be|Y
01|234123|2|4|disclosed prior to acceptance of an order.|Y
01|234124|3|1|A tariff surcharge may be added to this quotation in|Y
01|234124|3|2|the event of a sustained tariff increase on the|Y
01|234124|3|3|importation of this product.  Any surcharge will be|Y
01|234124|3|4|disclosed prior to acceptance of an order.|Y
01|234125|4|1|A tariff surcharge may be added to this quotation in|Y
01|234125|4|2|the event of a sustained tariff increase on the|Y
01|234125|4|3|importation of this product.  Any surcharge will be|Y
01|234125|4|4|disclosed prior to acceptance of an order.|Y
01|234126|2|1|Part Number: TBD|Y
01|234126|2|2|KD Collet: Custom Variant 2|Y
01|234126|2|3|23mm shaft diameter|Y
01|234126|3|1|Part Number: TBD|Y
01|234126|3|2|KD Collet: Custom Variant 3|Y
01|234126|3|3|22mm shaft diameter|Y
01|234126|4|1|A tariff surcharge may be added to this quotation in|Y
01|234126|4|2|the event of a sustained tariff increase on the|Y
01|234126|4|3|importation of this product.  Any surcharge will be|Y
01|234126|4|4|disclosed prior to acceptance of an order.|Y
01|234127|2|1|A tariff surcharge may be added to this quotation in|Y
01|234127|2|2|the event of a sustained tariff increase on the|Y
01|234127|2|3|importation of this product.  Any surcharge will be|Y
01|234127|2|4|disclosed prior to acceptance of an order.|Y
01|234128|2|1|A tariff surcharge may be added to this quotation in|Y
01|234128|2|2|the event of a sustained tariff increase on the|Y
01|234128|2|3|importation of this product.  Any surcharge will be|Y
01|234128|2|4|disclosed prior to acceptance of an order.|Y
01|234130|3|1|A tariff surcharge may be added to this quotation in|Y
01|234130|3|2|the event of a sustained tariff increase on the|Y
01|234130|3|3|importation of this product.  Any surcharge will be|Y
01|234130|3|4|disclosed prior to acceptance of an order.|Y
01|234131|8|1|A tariff surcharge may be added to this quotation in|Y
01|234131|8|2|the event of a sustained tariff increase on the|Y
01|234131|8|3|importation of this product.  Any surcharge will be|Y
01|234131|8|4|disclosed prior to acceptance of an order.|Y
01|234132|2|1|A tariff surcharge may be added to this quotation in|Y
01|234132|2|2|the event of a sustained tariff increase on the|Y
01|234132|2|3|importation of this product.  Any surcharge will be|Y
01|234132|2|4|disclosed prior to acceptance of an order.|Y
01|234133|2|1|A tariff surcharge may be added to this quotation in|Y
01|234133|2|2|the event of a sustained tariff increase on the|Y
01|234133|2|3|importation of this product.  Any surcharge will be|Y
01|234133|2|4|disclosed prior to acceptance of an order.|Y
01|234134|2|1|A tariff surcharge may be added to this quotation in|Y
01|234134|2|2|the event of a sustained tariff increase on the|Y
01|234134|2|3|importation of this product.  Any surcharge will be|Y
01|234134|2|4|disclosed prior to acceptance of an order.|Y
01|234135|3|1|A tariff surcharge may be added to this quotation in|Y
01|234135|3|2|the event of a sustained tariff increase on the|Y
01|234135|3|3|importation of this product.  Any surcharge will be|Y
01|234135|3|4|disclosed prior to acceptance of an order.|Y
01|234136|17|1|A tariff surcharge may be added to this quotation in|Y
01|234136|17|2|the event of a sustained tariff increase on the|Y
01|234136|17|3|importation of this product.  Any surcharge will be|Y
01|234136|17|4|disclosed prior to acceptance of an order.|Y
01|234137|3|1|A tariff surcharge may be added to this quotation in|Y
01|234137|3|2|the event of a sustained tariff increase on the|Y
01|234137|3|3|importation of this product.  Any surcharge will be|Y
01|234137|3|4|disclosed prior to acceptance of an order.|Y
01|234139|3|1|A tariff surcharge may be added to this quotation in|Y
01|234139|3|2|the event of a sustained tariff increase on the|Y
01|234139|3|3|importation of this product.  Any surcharge will be|Y
01|234139|3|4|disclosed prior to acceptance of an order.|Y
01|234140|2|1|A tariff surcharge may be added to this quotation in|Y
01|234140|2|2|the event of a sustained tariff increase on the|Y
01|234140|2|3|importation of this product.  Any surcharge will be|Y
01|234140|2|4|disclosed prior to acceptance of an order.|Y
01|234141|2|1|A tariff surcharge may be added to this quotation in|Y
01|234141|2|2|the event of a sustained tariff increase on the|Y
01|234141|2|3|importation of this product.  Any surcharge will be|Y
01|234141|2|4|disclosed prior to acceptance of an order.|Y
01|234142|2|1|A tariff surcharge may be added to this quotation in|Y
01|234142|2|2|the event of a sustained tariff increase on the|Y
01|234142|2|3|importation of this product.  Any surcharge will be|Y
01|234142|2|4|disclosed prior to acceptance of an order.|Y
01|234143|2|1|A tariff surcharge may be added to this quotation in|Y
01|234143|2|2|the event of a sustained tariff increase on the|Y
01|234143|2|3|importation of this product.  Any surcharge will be|Y
01|234143|2|4|disclosed prior to acceptance of an order.|Y
01|234144|5|1|Estimated lead time is end of September/beginning of|Y
01|234144|5|2|October.|Y
01|234144|8|1|Quoted in place of 150U-gage length n/a|Y
01|234144|30|1|Alternate for SK25-25.5|Y
01|234144|31|1|Non-standard stock.Non-returnablenon-cancellable.|Y
01|234144|31|2|1 piece lead time is 2~3 weeks 2nd piece lead time is|Y
01|234144|31|3|approximately 14~16 weeks.|Y
01|234144|45|1|A tariff surcharge may be added to this quotation in|Y
01|234144|45|2|the event of a sustained tariff increase on the|Y
01|234144|45|3|importation of this product.  Any surcharge will be|Y
01|234144|45|4|disclosed prior to acceptance of an order.|Y
01|234145|2|1|A tariff surcharge may be added to this quotation in|Y
01|234145|2|2|the event of a sustained tariff increase on the|Y
01|234145|2|3|importation of this product.  Any surcharge will be|Y
01|234145|2|4|disclosed prior to acceptance of an order.|Y
01|234146|2|1|A tariff surcharge may be added to this quotation in|Y
01|234146|2|2|the event of a sustained tariff increase on the|Y
01|234146|2|3|importation of this product.  Any surcharge will be|Y
01|234146|2|4|disclosed prior to acceptance of an order.|Y
01|234147|2|1|A tariff surcharge may be added to this quotation in|Y
01|234147|2|2|the event of a sustained tariff increase on the|Y
01|234147|2|3|importation of this product.  Any surcharge will be|Y
01|234147|2|4|disclosed prior to acceptance of an order.|Y
01|234148|2|1|A tariff surcharge may be added to this quotation in|Y
01|234148|2|2|the event of a sustained tariff increase on the|Y
01|234148|2|3|importation of this product.  Any surcharge will be|Y
01|234148|2|4|disclosed prior to acceptance of an order.|Y
01|234149|2|1|A tariff surcharge may be added to this quotation in|Y
01|234149|2|2|the event of a sustained tariff increase on the|Y
01|234149|2|3|importation of this product.  Any surcharge will be|Y
01|234149|2|4|disclosed prior to acceptance of an order.|Y
01|234150|2|1|A tariff surcharge may be added to this quotation in|Y
01|234150|2|2|the event of a sustained tariff increase on the|Y
01|234150|2|3|importation of this product.  Any surcharge will be|Y
01|234150|2|4|disclosed prior to acceptance of an order.|Y
01|234151|8|1|A tariff surcharge may be added to this quotation in|Y
01|234151|8|2|the event of a sustained tariff increase on the|Y
01|234151|8|3|importation of this product.  Any surcharge will be|Y
01|234151|8|4|disclosed prior to acceptance of an order.|Y
01|234152|4|1|A tariff surcharge may be added to this quotation in|Y
01|234152|4|2|the event of a sustained tariff increase on the|Y
01|234152|4|3|importation of this product.  Any surcharge will be|Y
01|234152|4|4|disclosed prior to acceptance of an order.|Y
01|234153|2|1|A tariff surcharge may be added to this quotation in|Y
01|234153|2|2|the event of a sustained tariff increase on the|Y
01|234153|2|3|importation of this product.  Any surcharge will be|Y
01|234153|2|4|disclosed prior to acceptance of an order.|Y
01|234154|4|1|A tariff surcharge may be added to this quotation in|Y
01|234154|4|2|the event of a sustained tariff increase on the|Y
01|234154|4|3|importation of this product.  Any surcharge will be|Y
01|234154|4|4|disclosed prior to acceptance of an order.|Y
01|234155|13|1|A tariff surcharge may be added to this quotation in|Y
01|234155|13|2|the event of a sustained tariff increase on the|Y
01|234155|13|3|importation of this product.  Any surcharge will be|Y
01|234155|13|4|disclosed prior to acceptance of an order.|Y
01|234156|2|1|A tariff surcharge may be added to this quotation in|Y
01|234156|2|2|the event of a sustained tariff increase on the|Y
01|234156|2|3|importation of this product.  Any surcharge will be|Y
01|234156|2|4|disclosed prior to acceptance of an order.|Y
01|234157|6|1|A tariff surcharge may be added to this quotation in|Y
01|234157|6|2|the event of a sustained tariff increase on the|Y
01|234157|6|3|importation of this product.  Any surcharge will be|Y
01|234157|6|4|disclosed prior to acceptance of an order.|Y
01|234158|2|1|A tariff surcharge may be added to this quotation in|Y
01|234158|2|2|the event of a sustained tariff increase on the|Y
01|234158|2|3|importation of this product.  Any surcharge will be|Y
01|234158|2|4|disclosed prior to acceptance of an order.|Y
01|234159|1|1|includes power and feedback cables from the Nikken|Y
01|234159|1|2|Table to the Machine Bulkhead|Y
01|234159|2|1|A tariff surcharge may be added to this quotation in|Y
01|234159|2|2|the event of a sustained tariff increase on the|Y
01|234159|2|3|importation of this product.  Any surcharge will be|Y
01|234159|2|4|disclosed prior to acceptance of an order.|Y
01|234160|2|1|A tariff surcharge may be added to this quotation in|Y
01|234160|2|2|the event of a sustained tariff increase on the|Y
01|234160|2|3|importation of this product.  Any surcharge will be|Y
01|234160|2|4|disclosed prior to acceptance of an order.|Y
01|234161|5|1|A tariff surcharge may be added to this quotation in|Y
01|234161|5|2|the event of a sustained tariff increase on the|Y
01|234161|5|3|importation of this product.  Any surcharge will be|Y
01|234161|5|4|disclosed prior to acceptance of an order.|Y
01|234162|2|1|A tariff surcharge may be added to this quotation in|Y
01|234162|2|2|the event of a sustained tariff increase on the|Y
01|234162|2|3|importation of this product.  Any surcharge will be|Y
01|234162|2|4|disclosed prior to acceptance of an order.|Y
01|234163|6|1|A tariff surcharge may be added to this quotation in|Y
01|234163|6|2|the event of a sustained tariff increase on the|Y
01|234163|6|3|importation of this product.  Any surcharge will be|Y
01|234163|6|4|disclosed prior to acceptance of an order.|Y
01|234164|1|1|Please note additional 5% applied per R8 qty. breaks.|Y
01|234164|2|1|A tariff surcharge may be added to this quotation in|Y
01|234164|2|2|the event of a sustained tariff increase on the|Y
01|234164|2|3|importation of this product.  Any surcharge will be|Y
01|234164|2|4|disclosed prior to acceptance of an order.|Y
01|234165|2|1|A tariff surcharge may be added to this quotation in|Y
01|234165|2|2|the event of a sustained tariff increase on the|Y
01|234165|2|3|importation of this product.  Any surcharge will be|Y
01|234165|2|4|disclosed prior to acceptance of an order.|Y
01|234166|4|1|A tariff surcharge may be added to this quotation in|Y
01|234166|4|2|the event of a sustained tariff increase on the|Y
01|234166|4|3|importation of this product.  Any surcharge will be|Y
01|234166|4|4|disclosed prior to acceptance of an order.|Y
01|234167|2|1|A tariff surcharge may be added to this quotation in|Y
01|234167|2|2|the event of a sustained tariff increase on the|Y
01|234167|2|3|importation of this product.  Any surcharge will be|Y
01|234167|2|4|disclosed prior to acceptance of an order.|Y
01|234168|3|1|A tariff surcharge may be added to this quotation in|Y
01|234168|3|2|the event of a sustained tariff increase on the|Y
01|234168|3|3|importation of this product.  Any surcharge will be|Y
01|234168|3|4|disclosed prior to acceptance of an order.|Y
01|234169|2|1|A tariff surcharge may be added to this quotation in|Y
01|234169|2|2|the event of a sustained tariff increase on the|Y
01|234169|2|3|importation of this product.  Any surcharge will be|Y
01|234169|2|4|disclosed prior to acceptance of an order.|Y
01|234170|1|1|Quoted at NET price.|Y
01|234170|4|1|A tariff surcharge may be added to this quotation in|Y
01|234170|4|2|the event of a sustained tariff increase on the|Y
01|234170|4|3|importation of this product.  Any surcharge will be|Y
01|234170|4|4|disclosed prior to acceptance of an order.|Y
01|234171|4|1|A tariff surcharge may be added to this quotation in|Y
01|234171|4|2|the event of a sustained tariff increase on the|Y
01|234171|4|3|importation of this product.  Any surcharge will be|Y
01|234171|4|4|disclosed prior to acceptance of an order.|Y
01|234172|34|1|A tariff surcharge may be added to this quotation in|Y
01|234172|34|2|the event of a sustained tariff increase on the|Y
01|234172|34|3|importation of this product.  Any surcharge will be|Y
01|234172|34|4|disclosed prior to acceptance of an order.|Y
01|234173|2|1|A tariff surcharge may be added to this quotation in|Y
01|234173|2|2|the event of a sustained tariff increase on the|Y
01|234173|2|3|importation of this product.  Any surcharge will be|Y
01|234173|2|4|disclosed prior to acceptance of an order.|Y
01|234174|3|1|A tariff surcharge may be added to this quotation in|Y
01|234174|3|2|the event of a sustained tariff increase on the|Y
01|234174|3|3|importation of this product.  Any surcharge will be|Y
01|234174|3|4|disclosed prior to acceptance of an order.|Y
01|234175|77|1|A tariff surcharge may be added to this quotation in|Y
01|234175|77|2|the event of a sustained tariff increase on the|Y
01|234175|77|3|importation of this product.  Any surcharge will be|Y
01|234175|77|4|disclosed prior to acceptance of an order.|Y
01|234176|2|1|A tariff surcharge may be added to this quotation in|Y
01|234176|2|2|the event of a sustained tariff increase on the|Y
01|234176|2|3|importation of this product.  Any surcharge will be|Y
01|234176|2|4|disclosed prior to acceptance of an order.|Y
01|234177|2|1|A tariff surcharge may be added to this quotation in|Y
01|234177|2|2|the event of a sustained tariff increase on the|Y
01|234177|2|3|importation of this product.  Any surcharge will be|Y
01|234177|2|4|disclosed prior to acceptance of an order.|Y
01|234178|2|1|A tariff surcharge may be added to this quotation in|Y
01|234178|2|2|the event of a sustained tariff increase on the|Y
01|234178|2|3|importation of this product.  Any surcharge will be|Y
01|234178|2|4|disclosed prior to acceptance of an order.|Y
01|234179|2|1|A tariff surcharge may be added to this quotation in|Y
01|234179|2|2|the event of a sustained tariff increase on the|Y
01|234179|2|3|importation of this product.  Any surcharge will be|Y
01|234179|2|4|disclosed prior to acceptance of an order.|Y
01|234180|9|1|A tariff surcharge may be added to this quotation in|Y
01|234180|9|2|the event of a sustained tariff increase on the|Y
01|234180|9|3|importation of this product.  Any surcharge will be|Y
01|234180|9|4|disclosed prior to acceptance of an order.|Y
01|234182|5|1|A tariff surcharge may be added to this quotation in|Y
01|234182|5|2|the event of a sustained tariff increase on the|Y
01|234182|5|3|importation of this product.  Any surcharge will be|Y
01|234182|5|4|disclosed prior to acceptance of an order.|Y
01|234183|2|1|A tariff surcharge may be added to this quotation in|Y
01|234183|2|2|the event of a sustained tariff increase on the|Y
01|234183|2|3|importation of this product.  Any surcharge will be|Y
01|234183|2|4|disclosed prior to acceptance of an order.|Y
01|234184|2|1|A tariff surcharge may be added to this quotation in|Y
01|234184|2|2|the event of a sustained tariff increase on the|Y
01|234184|2|3|importation of this product.  Any surcharge will be|Y
01|234184|2|4|disclosed prior to acceptance of an order.|Y
01|234185|6|1|A tariff surcharge may be added to this quotation in|Y
01|234185|6|2|the event of a sustained tariff increase on the|Y
01|234185|6|3|importation of this product.  Any surcharge will be|Y
01|234185|6|4|disclosed prior to acceptance of an order.|Y
01|234186|2|1|A tariff surcharge may be added to this quotation in|Y
01|234186|2|2|the event of a sustained tariff increase on the|Y
01|234186|2|3|importation of this product.  Any surcharge will be|Y
01|234186|2|4|disclosed prior to acceptance of an order.|Y
01|234187|3|1|A tariff surcharge may be added to this quotation in|Y
01|234187|3|2|the event of a sustained tariff increase on the|Y
01|234187|3|3|importation of this product.  Any surcharge will be|Y
01|234187|3|4|disclosed prior to acceptance of an order.|Y
01|234188|5|1|A tariff surcharge may be added to this quotation in|Y
01|234188|5|2|the event of a sustained tariff increase on the|Y
01|234188|5|3|importation of this product.  Any surcharge will be|Y
01|234188|5|4|disclosed prior to acceptance of an order.|Y
01|234189|6|1|A tariff surcharge may be added to this quotation in|Y
01|234189|6|2|the event of a sustained tariff increase on the|Y
01|234189|6|3|importation of this product.  Any surcharge will be|Y
01|234189|6|4|disclosed prior to acceptance of an order.|Y
01|234190|1|1|RGA#TOR-61963/|Y
01|234190|1|2|Repair of T05-032(S)|Y
01|234190|3|1|Calibration service included|Y
01|234190|4|1|A tariff surcharge may be added to this quotation in|Y
01|234190|4|2|the event of a sustained tariff increase on the|Y
01|234190|4|3|importation of this product.  Any surcharge will be|Y
01|234190|4|4|disclosed prior to acceptance of an order.|Y
01|234191|2|1|A tariff surcharge may be added to this quotation in|Y
01|234191|2|2|the event of a sustained tariff increase on the|Y
01|234191|2|3|importation of this product.  Any surcharge will be|Y
01|234191|2|4|disclosed prior to acceptance of an order.|Y
01|234192|6|1|If you are holding 6.2mm please see below collet|Y
01|234192|6|2|SK10-6.5 which will hold 6.2mm and we have in stock in|Y
01|234192|6|3|Mundelein IL.|Y
01|234192|8|1|A tariff surcharge may be added to this quotation in|Y
01|234192|8|2|the event of a sustained tariff increase on the|Y
01|234192|8|3|importation of this product.  Any surcharge will be|Y
01|234192|8|4|disclosed prior to acceptance of an order.|Y
01|234193|1|1|Tariff Code: 8466.10.0175 / Country of Origin Japan|Y
01|234193|4|1|A tariff surcharge may be added to this quotation in|Y
01|234193|4|2|the event of a sustained tariff increase on the|Y
01|234193|4|3|importation of this product.  Any surcharge will be|Y
01|234193|4|4|disclosed prior to acceptance of an order.|Y
01|234194|2|1|A tariff surcharge may be added to this quotation in|Y
01|234194|2|2|the event of a sustained tariff increase on the|Y
01|234194|2|3|importation of this product.  Any surcharge will be|Y
01|234194|2|4|disclosed prior to acceptance of an order.|Y
01|234195|2|1|A tariff surcharge may be added to this quotation in|Y
01|234195|2|2|the event of a sustained tariff increase on the|Y
01|234195|2|3|importation of this product.  Any surcharge will be|Y
01|234195|2|4|disclosed prior to acceptance of an order.|Y
01|234197|2|1|A tariff surcharge may be added to this quotation in|Y
01|234197|2|2|the event of a sustained tariff increase on the|Y
01|234197|2|3|importation of this product.  Any surcharge will be|Y
01|234197|2|4|disclosed prior to acceptance of an order.|Y
01|234198|3|1|A tariff surcharge may be added to this quotation in|Y
01|234198|3|2|the event of a sustained tariff increase on the|Y
01|234198|3|3|importation of this product.  Any surcharge will be|Y
01|234198|3|4|disclosed prior to acceptance of an order.|Y
01|234199|6|1|A tariff surcharge may be added to this quotation in|Y
01|234199|6|2|the event of a sustained tariff increase on the|Y
01|234199|6|3|importation of this product.  Any surcharge will be|Y
01|234199|6|4|disclosed prior to acceptance of an order.|Y
01|234200|4|1|A tariff surcharge may be added to this quotation in|Y
01|234200|4|2|the event of a sustained tariff increase on the|Y
01|234200|4|3|importation of this product.  Any surcharge will be|Y
01|234200|4|4|disclosed prior to acceptance of an order.|Y
01|234201|3|1|A tariff surcharge may be added to this quotation in|Y
01|234201|3|2|the event of a sustained tariff increase on the|Y
01|234201|3|3|importation of this product.  Any surcharge will be|Y
01|234201|3|4|disclosed prior to acceptance of an order.|Y
01|234202|2|1|A tariff surcharge may be added to this quotation in|Y
01|234202|2|2|the event of a sustained tariff increase on the|Y
01|234202|2|3|importation of this product.  Any surcharge will be|Y
01|234202|2|4|disclosed prior to acceptance of an order.|Y
01|234203|5|1|A tariff surcharge may be added to this quotation in|Y
01|234203|5|2|the event of a sustained tariff increase on the|Y
01|234203|5|3|importation of this product.  Any surcharge will be|Y
01|234203|5|4|disclosed prior to acceptance of an order.|Y
01|234204|2|1|A tariff surcharge may be added to this quotation in|Y
01|234204|2|2|the event of a sustained tariff increase on the|Y
01|234204|2|3|importation of this product.  Any surcharge will be|Y
01|234204|2|4|disclosed prior to acceptance of an order.|Y
01|234205|2|1|A tariff surcharge may be added to this quotation in|Y
01|234205|2|2|the event of a sustained tariff increase on the|Y
01|234205|2|3|importation of this product.  Any surcharge will be|Y
01|234205|2|4|disclosed prior to acceptance of an order.|Y
01|234206|3|1|A tariff surcharge may be added to this quotation in|Y
01|234206|3|2|the event of a sustained tariff increase on the|Y
01|234206|3|3|importation of this product.  Any surcharge will be|Y
01|234206|3|4|disclosed prior to acceptance of an order.|Y
01|234207|5|1|A tariff surcharge may be added to this quotation in|Y
01|234207|5|2|the event of a sustained tariff increase on the|Y
01|234207|5|3|importation of this product.  Any surcharge will be|Y
01|234207|5|4|disclosed prior to acceptance of an order.|Y
01|234208|7|1|A tariff surcharge may be added to this quotation in|Y
01|234208|7|2|the event of a sustained tariff increase on the|Y
01|234208|7|3|importation of this product.  Any surcharge will be|Y
01|234208|7|4|disclosed prior to acceptance of an order.|Y
01|234209|4|1|A tariff surcharge may be added to this quotation in|Y
01|234209|4|2|the event of a sustained tariff increase on the|Y
01|234209|4|3|importation of this product.  Any surcharge will be|Y
01|234209|4|4|disclosed prior to acceptance of an order.|Y
01|234210|2|1|A tariff surcharge may be added to this quotation in|Y
01|234210|2|2|the event of a sustained tariff increase on the|Y
01|234210|2|3|importation of this product.  Any surcharge will be|Y
01|234210|2|4|disclosed prior to acceptance of an order.|Y
01|234211|2|1|A tariff surcharge may be added to this quotation in|Y
01|234211|2|2|the event of a sustained tariff increase on the|Y
01|234211|2|3|importation of this product.  Any surcharge will be|Y
01|234211|2|4|disclosed prior to acceptance of an order.|Y
01|234212|3|1|A tariff surcharge may be added to this quotation in|Y
01|234212|3|2|the event of a sustained tariff increase on the|Y
01|234212|3|3|importation of this product.  Any surcharge will be|Y
01|234212|3|4|disclosed prior to acceptance of an order.|Y
01|234213|3|1|A tariff surcharge may be added to this quotation in|Y
01|234213|3|2|the event of a sustained tariff increase on the|Y
01|234213|3|3|importation of this product.  Any surcharge will be|Y
01|234213|3|4|disclosed prior to acceptance of an order.|Y
01|234214|2|1|A tariff surcharge may be added to this quotation in|Y
01|234214|2|2|the event of a sustained tariff increase on the|Y
01|234214|2|3|importation of this product.  Any surcharge will be|Y
01|234214|2|4|disclosed prior to acceptance of an order.|Y
01|234215|4|1|A tariff surcharge may be added to this quotation in|Y
01|234215|4|2|the event of a sustained tariff increase on the|Y
01|234215|4|3|importation of this product.  Any surcharge will be|Y
01|234215|4|4|disclosed prior to acceptance of an order.|Y
01|234216|5|1|A tariff surcharge may be added to this quotation in|Y
01|234216|5|2|the event of a sustained tariff increase on the|Y
01|234216|5|3|importation of this product.  Any surcharge will be|Y
01|234216|5|4|disclosed prior to acceptance of an order.|Y
01|234217|3|1|A tariff surcharge may be added to this quotation in|Y
01|234217|3|2|the event of a sustained tariff increase on the|Y
01|234217|3|3|importation of this product.  Any surcharge will be|Y
01|234217|3|4|disclosed prior to acceptance of an order.|Y
01|234218|3|1|A tariff surcharge may be added to this quotation in|Y
01|234218|3|2|the event of a sustained tariff increase on the|Y
01|234218|3|3|importation of this product.  Any surcharge will be|Y
01|234218|3|4|disclosed prior to acceptance of an order.|Y
01|234219|2|1|A tariff surcharge may be added to this quotation in|Y
01|234219|2|2|the event of a sustained tariff increase on the|Y
01|234219|2|3|importation of this product.  Any surcharge will be|Y
01|234219|2|4|disclosed prior to acceptance of an order.|Y
01|234220|2|1|A tariff surcharge may be added to this quotation in|Y
01|234220|2|2|the event of a sustained tariff increase on the|Y
01|234220|2|3|importation of this product.  Any surcharge will be|Y
01|234220|2|4|disclosed prior to acceptance of an order.|Y
01|234221|3|1|A tariff surcharge may be added to this quotation in|Y
01|234221|3|2|the event of a sustained tariff increase on the|Y
01|234221|3|3|importation of this product.  Any surcharge will be|Y
01|234221|3|4|disclosed prior to acceptance of an order.|Y
01|234222|2|1|A tariff surcharge may be added to this quotation in|Y
01|234222|2|2|the event of a sustained tariff increase on the|Y
01|234222|2|3|importation of this product.  Any surcharge will be|Y
01|234222|2|4|disclosed prior to acceptance of an order.|Y
01|234223|2|1|A tariff surcharge may be added to this quotation in|Y
01|234223|2|2|the event of a sustained tariff increase on the|Y
01|234223|2|3|importation of this product.  Any surcharge will be|Y
01|234223|2|4|disclosed prior to acceptance of an order.|Y
01|234224|2|1|A tariff surcharge may be added to this quotation in|Y
01|234224|2|2|the event of a sustained tariff increase on the|Y
01|234224|2|3|importation of this product.  Any surcharge will be|Y
01|234224|2|4|disclosed prior to acceptance of an order.|Y
01|234225|2|1|A tariff surcharge may be added to this quotation in|Y
01|234225|2|2|the event of a sustained tariff increase on the|Y
01|234225|2|3|importation of this product.  Any surcharge will be|Y
01|234225|2|4|disclosed prior to acceptance of an order.|Y
01|234226|4|1|A tariff surcharge may be added to this quotation in|Y
01|234226|4|2|the event of a sustained tariff increase on the|Y
01|234226|4|3|importation of this product.  Any surcharge will be|Y
01|234226|4|4|disclosed prior to acceptance of an order.|Y
01|234227|2|1|A tariff surcharge may be added to this quotation in|Y
01|234227|2|2|the event of a sustained tariff increase on the|Y
01|234227|2|3|importation of this product.  Any surcharge will be|Y
01|234227|2|4|disclosed prior to acceptance of an order.|Y
01|234228|2|1|A tariff surcharge may be added to this quotation in|Y
01|234228|2|2|the event of a sustained tariff increase on the|Y
01|234228|2|3|importation of this product.  Any surcharge will be|Y
01|234228|2|4|disclosed prior to acceptance of an order.|Y
01|234229|5|1|A tariff surcharge may be added to this quotation in|Y
01|234229|5|2|the event of a sustained tariff increase on the|Y
01|234229|5|3|importation of this product.  Any surcharge will be|Y
01|234229|5|4|disclosed prior to acceptance of an order.|Y
01|234230|2|1|A tariff surcharge may be added to this quotation in|Y
01|234230|2|2|the event of a sustained tariff increase on the|Y
01|234230|2|3|importation of this product.  Any surcharge will be|Y
01|234230|2|4|disclosed prior to acceptance of an order.|Y
01|234231|11|1|A tariff surcharge may be added to this quotation in|Y
01|234231|11|2|the event of a sustained tariff increase on the|Y
01|234231|11|3|importation of this product.  Any surcharge will be|Y
01|234231|11|4|disclosed prior to acceptance of an order.|Y
01|234232|15|1|A tariff surcharge may be added to this quotation in|Y
01|234232|15|2|the event of a sustained tariff increase on the|Y
01|234232|15|3|importation of this product.  Any surcharge will be|Y
01|234232|15|4|disclosed prior to acceptance of an order.|Y
01|234233|7|1|A tariff surcharge may be added to this quotation in|Y
01|234233|7|2|the event of a sustained tariff increase on the|Y
01|234233|7|3|importation of this product.  Any surcharge will be|Y
01|234233|7|4|disclosed prior to acceptance of an order.|Y
01|234234|3|1|A tariff surcharge may be added to this quotation in|Y
01|234234|3|2|the event of a sustained tariff increase on the|Y
01|234234|3|3|importation of this product.  Any surcharge will be|Y
01|234234|3|4|disclosed prior to acceptance of an order.|Y
01|234235|24|1|A tariff surcharge may be added to this quotation in|Y
01|234235|24|2|the event of a sustained tariff increase on the|Y
01|234235|24|3|importation of this product.  Any surcharge will be|Y
01|234235|24|4|disclosed prior to acceptance of an order.|Y
01|234236|4|1|***OPTION #1***|Y
01|234236|5|1|***OPTION #2***|Y
01|234236|6|1|A tariff surcharge may be added to this quotation in|Y
01|234236|6|2|the event of a sustained tariff increase on the|Y
01|234236|6|3|importation of this product.  Any surcharge will be|Y
01|234236|6|4|disclosed prior to acceptance of an order.|Y
01|234237|8|1|PRICING ESTIMATED...|Y
01|234237|8|2|INCLUDES... INSTALLATION REMOTE SUPPORT ATR??|Y
01|234237|8|3|ENGINEERING REVIEW PENDING...|Y
01|234237|9|1|A tariff surcharge may be added to this quotation in|Y
01|234237|9|2|the event of a sustained tariff increase on the|Y
01|234237|9|3|importation of this product.  Any surcharge will be|Y
01|234237|9|4|disclosed prior to acceptance of an order.|Y
01|234238|6|1|A tariff surcharge may be added to this quotation in|Y
01|234238|6|2|the event of a sustained tariff increase on the|Y
01|234238|6|3|importation of this product.  Any surcharge will be|Y
01|234238|6|4|disclosed prior to acceptance of an order.|Y
01|234239|15|1|A tariff surcharge may be added to this quotation in|Y
01|234239|15|2|the event of a sustained tariff increase on the|Y
01|234239|15|3|importation of this product.  Any surcharge will be|Y
01|234239|15|4|disclosed prior to acceptance of an order.|Y
01|234240|1|1|RGA#TAR-61911|Y
01|234240|1|2|CNC401 SN:14098|Y
01|234240|23|1|CN321RB211008L01/1 SEAL FLANGE|Y
01|234240|24|1|A tariff surcharge may be added to this quotation in|Y
01|234240|24|2|the event of a sustained tariff increase on the|Y
01|234240|24|3|importation of this product.  Any surcharge will be|Y
01|234240|24|4|disclosed prior to acceptance of an order.|Y
01|234241|4|1|A tariff surcharge may be added to this quotation in|Y
01|234241|4|2|the event of a sustained tariff increase on the|Y
01|234241|4|3|importation of this product.  Any surcharge will be|Y
01|234241|4|4|disclosed prior to acceptance of an order.|Y
01|234242|2|1|A tariff surcharge may be added to this quotation in|Y
01|234242|2|2|the event of a sustained tariff increase on the|Y
01|234242|2|3|importation of this product.  Any surcharge will be|Y
01|234242|2|4|disclosed prior to acceptance of an order.|Y
01|234243|2|1|A tariff surcharge may be added to this quotation in|Y
01|234243|2|2|the event of a sustained tariff increase on the|Y
01|234243|2|3|importation of this product.  Any surcharge will be|Y
01|234243|2|4|disclosed prior to acceptance of an order.|Y
01|234244|9|1|A tariff surcharge may be added to this quotation in|Y
01|234244|9|2|the event of a sustained tariff increase on the|Y
01|234244|9|3|importation of this product.  Any surcharge will be|Y
01|234244|9|4|disclosed prior to acceptance of an order.|Y
01|234245|3|1|A tariff surcharge may be added to this quotation in|Y
01|234245|3|2|the event of a sustained tariff increase on the|Y
01|234245|3|3|importation of this product.  Any surcharge will be|Y
01|234245|3|4|disclosed prior to acceptance of an order.|Y
01|234246|2|1|A tariff surcharge may be added to this quotation in|Y
01|234246|2|2|the event of a sustained tariff increase on the|Y
01|234246|2|3|importation of this product.  Any surcharge will be|Y
01|234246|2|4|disclosed prior to acceptance of an order.|Y
01|234247|3|1|A tariff surcharge may be added to this quotation in|Y
01|234247|3|2|the event of a sustained tariff increase on the|Y
01|234247|3|3|importation of this product.  Any surcharge will be|Y
01|234247|3|4|disclosed prior to acceptance of an order.|Y
01|234248|6|1|A tariff surcharge may be added to this quotation in|Y
01|234248|6|2|the event of a sustained tariff increase on the|Y
01|234248|6|3|importation of this product.  Any surcharge will be|Y
01|234248|6|4|disclosed prior to acceptance of an order.|Y
01|234250|2|1|A tariff surcharge may be added to this quotation in|Y
01|234250|2|2|the event of a sustained tariff increase on the|Y
01|234250|2|3|importation of this product.  Any surcharge will be|Y
01|234250|2|4|disclosed prior to acceptance of an order.|Y
01|234251|2|1|A tariff surcharge may be added to this quotation in|Y
01|234251|2|2|the event of a sustained tariff increase on the|Y
01|234251|2|3|importation of this product.  Any surcharge will be|Y
01|234251|2|4|disclosed prior to acceptance of an order.|Y
01|234252|2|1|A tariff surcharge may be added to this quotation in|Y
01|234252|2|2|the event of a sustained tariff increase on the|Y
01|234252|2|3|importation of this product.  Any surcharge will be|Y
01|234252|2|4|disclosed prior to acceptance of an order.|Y
01|234253|2|1|A tariff surcharge may be added to this quotation in|Y
01|234253|2|2|the event of a sustained tariff increase on the|Y
01|234253|2|3|importation of this product.  Any surcharge will be|Y
01|234253|2|4|disclosed prior to acceptance of an order.|Y
01|234254|2|1|A tariff surcharge may be added to this quotation in|Y
01|234254|2|2|the event of a sustained tariff increase on the|Y
01|234254|2|3|importation of this product.  Any surcharge will be|Y
01|234254|2|4|disclosed prior to acceptance of an order.|Y
01|234255|2|1|A tariff surcharge may be added to this quotation in|Y
01|234255|2|2|the event of a sustained tariff increase on the|Y
01|234255|2|3|importation of this product.  Any surcharge will be|Y
01|234255|2|4|disclosed prior to acceptance of an order.|Y
01|234256|2|1|A tariff surcharge may be added to this quotation in|Y
01|234256|2|2|the event of a sustained tariff increase on the|Y
01|234256|2|3|importation of this product.  Any surcharge will be|Y
01|234256|2|4|disclosed prior to acceptance of an order.|Y
01|234257|2|1|A tariff surcharge may be added to this quotation in|Y
01|234257|2|2|the event of a sustained tariff increase on the|Y
01|234257|2|3|importation of this product.  Any surcharge will be|Y
01|234257|2|4|disclosed prior to acceptance of an order.|Y
01|234258|2|1|A tariff surcharge may be added to this quotation in|Y
01|234258|2|2|the event of a sustained tariff increase on the|Y
01|234258|2|3|importation of this product.  Any surcharge will be|Y
01|234258|2|4|disclosed prior to acceptance of an order.|Y
01|234259|4|1|A tariff surcharge may be added to this quotation in|Y
01|234259|4|2|the event of a sustained tariff increase on the|Y
01|234259|4|3|importation of this product.  Any surcharge will be|Y
01|234259|4|4|disclosed prior to acceptance of an order.|Y
01|234260|23|1|A tariff surcharge may be added to this quotation in|Y
01|234260|23|2|the event of a sustained tariff increase on the|Y
01|234260|23|3|importation of this product.  Any surcharge will be|Y
01|234260|23|4|disclosed prior to acceptance of an order.|Y
01|234261|2|1|A tariff surcharge may be added to this quotation in|Y
01|234261|2|2|the event of a sustained tariff increase on the|Y
01|234261|2|3|importation of this product.  Any surcharge will be|Y
01|234261|2|4|disclosed prior to acceptance of an order.|Y
01|234262|2|1|A tariff surcharge may be added to this quotation in|Y
01|234262|2|2|the event of a sustained tariff increase on the|Y
01|234262|2|3|importation of this product.  Any surcharge will be|Y
01|234262|2|4|disclosed prior to acceptance of an order.|Y
01|234263|2|1|A tariff surcharge may be added to this quotation in|Y
01|234263|2|2|the event of a sustained tariff increase on the|Y
01|234263|2|3|importation of this product.  Any surcharge will be|Y
01|234263|2|4|disclosed prior to acceptance of an order.|Y
01|234264|2|1|A tariff surcharge may be added to this quotation in|Y
01|234264|2|2|the event of a sustained tariff increase on the|Y
01|234264|2|3|importation of this product.  Any surcharge will be|Y
01|234264|2|4|disclosed prior to acceptance of an order.|Y
01|234265|12|1|A tariff surcharge may be added to this quotation in|Y
01|234265|12|2|the event of a sustained tariff increase on the|Y
01|234265|12|3|importation of this product.  Any surcharge will be|Y
01|234265|12|4|disclosed prior to acceptance of an order.|Y
01|234266|3|1|A tariff surcharge may be added to this quotation in|Y
01|234266|3|2|the event of a sustained tariff increase on the|Y
01|234266|3|3|importation of this product.  Any surcharge will be|Y
01|234266|3|4|disclosed prior to acceptance of an order.|Y
01|234267|18|1|A tariff surcharge may be added to this quotation in|Y
01|234267|18|2|the event of a sustained tariff increase on the|Y
01|234267|18|3|importation of this product.  Any surcharge will be|Y
01|234267|18|4|disclosed prior to acceptance of an order.|Y
01|234268|2|1|A tariff surcharge may be added to this quotation in|Y
01|234268|2|2|the event of a sustained tariff increase on the|Y
01|234268|2|3|importation of this product.  Any surcharge will be|Y
01|234268|2|4|disclosed prior to acceptance of an order.|Y
01|234269|3|1|A tariff surcharge may be added to this quotation in|Y
01|234269|3|2|the event of a sustained tariff increase on the|Y
01|234269|3|3|importation of this product.  Any surcharge will be|Y
01|234269|3|4|disclosed prior to acceptance of an order.|Y
01|234270|2|1|A tariff surcharge may be added to this quotation in|Y
01|234270|2|2|the event of a sustained tariff increase on the|Y
01|234270|2|3|importation of this product.  Any surcharge will be|Y
01|234270|2|4|disclosed prior to acceptance of an order.|Y
01|234271|4|1|A tariff surcharge may be added to this quotation in|Y
01|234271|4|2|the event of a sustained tariff increase on the|Y
01|234271|4|3|importation of this product.  Any surcharge will be|Y
01|234271|4|4|disclosed prior to acceptance of an order.|Y
01|234272|2|1|A tariff surcharge may be added to this quotation in|Y
01|234272|2|2|the event of a sustained tariff increase on the|Y
01|234272|2|3|importation of this product.  Any surcharge will be|Y
01|234272|2|4|disclosed prior to acceptance of an order.|Y
01|234273|7|1|A tariff surcharge may be added to this quotation in|Y
01|234273|7|2|the event of a sustained tariff increase on the|Y
01|234273|7|3|importation of this product.  Any surcharge will be|Y
01|234273|7|4|disclosed prior to acceptance of an order.|Y
01|234274|2|1|A tariff surcharge may be added to this quotation in|Y
01|234274|2|2|the event of a sustained tariff increase on the|Y
01|234274|2|3|importation of this product.  Any surcharge will be|Y
01|234274|2|4|disclosed prior to acceptance of an order.|Y
01|234275|2|1|A tariff surcharge may be added to this quotation in|Y
01|234275|2|2|the event of a sustained tariff increase on the|Y
01|234275|2|3|importation of this product.  Any surcharge will be|Y
01|234275|2|4|disclosed prior to acceptance of an order.|Y
01|234276|15|1|A tariff surcharge may be added to this quotation in|Y
01|234276|15|2|the event of a sustained tariff increase on the|Y
01|234276|15|3|importation of this product.  Any surcharge will be|Y
01|234276|15|4|disclosed prior to acceptance of an order.|Y
01|234277|2|1|A tariff surcharge may be added to this quotation in|Y
01|234277|2|2|the event of a sustained tariff increase on the|Y
01|234277|2|3|importation of this product.  Any surcharge will be|Y
01|234277|2|4|disclosed prior to acceptance of an order.|Y
01|234278|4|1|A tariff surcharge may be added to this quotation in|Y
01|234278|4|2|the event of a sustained tariff increase on the|Y
01|234278|4|3|importation of this product.  Any surcharge will be|Y
01|234278|4|4|disclosed prior to acceptance of an order.|Y
01|234280|1|1|Part Number: TBD|Y
01|234280|1|2|Okuma BMT60 Live ER32 X<Radial>STRT ExtCool17MP HiSp10K|Y
01|234280|1|3|Offset|Y
01|234280|1|4|Shank for BMT style turret w/ D=60mm|Y
01|234280|1|5|Drive Length S=63.5mm / S1=76|Y
01|234280|1|6|Dihedral-drive with 10mm width across flat. Tooling|Y
01|234280|1|7|interface for collet system ER32 External coolant over|Y
01|234280|1|8|coolant pipe Rotation of direction reversal Central|Y
01|234280|1|9|offset V=63mm L=101mm Gear ratio: i(n1/n2)=1:1|Y
01|234280|1|10|Delivery: 6 Weeks Drawing 14 Weeks ADA|Y
01|234280|2|1|A tariff surcharge may be added to this quotation in|Y
01|234280|2|2|the event of a sustained tariff increase on the|Y
01|234280|2|3|importation of this product.  Any surcharge will be|Y
01|234280|2|4|disclosed prior to acceptance of an order.|Y
01|234281|33|1|A tariff surcharge may be added to this quotation in|Y
01|234281|33|2|the event of a sustained tariff increase on the|Y
01|234281|33|3|importation of this product.  Any surcharge will be|Y
01|234281|33|4|disclosed prior to acceptance of an order.|Y
01|234282|2|1|HSK100A-40-110 End mill Holder|Y
01|234282|8|1|A tariff surcharge may be added to this quotation in|Y
01|234282|8|2|the event of a sustained tariff increase on the|Y
01|234282|8|3|importation of this product.  Any surcharge will be|Y
01|234282|8|4|disclosed prior to acceptance of an order.|Y
01|234283|2|1|A tariff surcharge may be added to this quotation in|Y
01|234283|2|2|the event of a sustained tariff increase on the|Y
01|234283|2|3|importation of this product.  Any surcharge will be|Y
01|234283|2|4|disclosed prior to acceptance of an order.|Y
01|234284|9|1|A tariff surcharge may be added to this quotation in|Y
01|234284|9|2|the event of a sustained tariff increase on the|Y
01|234284|9|3|importation of this product.  Any surcharge will be|Y
01|234284|9|4|disclosed prior to acceptance of an order.|Y
01|234285|2|1|Okuma Retention Knob|Y
01|234285|3|1|Haas Retention Knob|Y
01|234285|28|1|A tariff surcharge may be added to this quotation in|Y
01|234285|28|2|the event of a sustained tariff increase on the|Y
01|234285|28|3|importation of this product.  Any surcharge will be|Y
01|234285|28|4|disclosed prior to acceptance of an order.|Y
01|234286|1|1|Pais de origen Croacia|Y
01|234286|2|1|Pais de origen Croacia|Y
01|234286|3|1|A tariff surcharge may be added to this quotation in|Y
01|234286|3|2|the event of a sustained tariff increase on the|Y
01|234286|3|3|importation of this product.  Any surcharge will be|Y
01|234286|3|4|disclosed prior to acceptance of an order.|Y
01|234288|3|1|A tariff surcharge may be added to this quotation in|Y
01|234288|3|2|the event of a sustained tariff increase on the|Y
01|234288|3|3|importation of this product.  Any surcharge will be|Y
01|234288|3|4|disclosed prior to acceptance of an order.|Y
01|234289|3|1|A tariff surcharge may be added to this quotation in|Y
01|234289|3|2|the event of a sustained tariff increase on the|Y
01|234289|3|3|importation of this product.  Any surcharge will be|Y
01|234289|3|4|disclosed prior to acceptance of an order.|Y
01|234290|4|1|A tariff surcharge may be added to this quotation in|Y
01|234290|4|2|the event of a sustained tariff increase on the|Y
01|234290|4|3|importation of this product.  Any surcharge will be|Y
01|234290|4|4|disclosed prior to acceptance of an order|Y
01|234291|3|1|A tariff surcharge may be added to this quotation in|Y
01|234291|3|2|the event of a sustained tariff increase on the|Y
01|234291|3|3|importation of this product.  Any surcharge will be|Y
01|234291|3|4|disclosed prior to acceptance of an order.|Y
01|234292|5|1|A tariff surcharge may be added to this quotation in|Y
01|234292|5|2|the event of a sustained tariff increase on the|Y
01|234292|5|3|importation of this product.  Any surcharge will be|Y
01|234292|5|4|disclosed prior to acceptance of an order.|Y
01|234293|3|1|A tariff surcharge may be added to this quotation in|Y
01|234293|3|2|the event of a sustained tariff increase on the|Y
01|234293|3|3|importation of this product.  Any surcharge will be|Y
01|234293|3|4|disclosed prior to acceptance of an order.|Y
01|234294|2|1|A tariff surcharge may be added to this quotation in|Y
01|234294|2|2|the event of a sustained tariff increase on the|Y
01|234294|2|3|importation of this product.  Any surcharge will be|Y
01|234294|2|4|disclosed prior to acceptance of an order.|Y
01|234295|1|1|Please Note pricing reflects a purchase order of 1~9-pc|Y
01|234295|1|2|Quoted at NET price|Y
01|234295|2|1|Please Note pricing reflects a purchase order of|Y
01|234295|2|2|10~19 pcs. Quoted at NET price|Y
01|234295|4|1|A tariff surcharge may be added to this quotation in|Y
01|234295|4|2|the event of a sustained tariff increase on the|Y
01|234295|4|3|importation of this product.  Any surcharge will be|Y
01|234295|4|4|disclosed prior to acceptance of an order.|Y
01|234296|2|1|A tariff surcharge may be added to this quotation in|Y
01|234296|2|2|the event of a sustained tariff increase on the|Y
01|234296|2|3|importation of this product.  Any surcharge will be|Y
01|234296|2|4|disclosed prior to acceptance of an order.|Y
01|234297|4|1|A tariff surcharge may be added to this quotation in|Y
01|234297|4|2|the event of a sustained tariff increase on the|Y
01|234297|4|3|importation of this product.  Any surcharge will be|Y
01|234297|4|4|disclosed prior to acceptance of an order.|Y
01|234298|4|1|A tariff surcharge may be added to this quotation in|Y
01|234298|4|2|the event of a sustained tariff increase on the|Y
01|234298|4|3|importation of this product.  Any surcharge will be|Y
01|234298|4|4|disclosed prior to acceptance of an order.|Y
01|234299|2|1|A tariff surcharge may be added to this quotation in|Y
01|234299|2|2|the event of a sustained tariff increase on the|Y
01|234299|2|3|importation of this product.  Any surcharge will be|Y
01|234299|2|4|disclosed prior to acceptance of an order.|Y
01|234300|4|1|A tariff surcharge may be added to this quotation in|Y
01|234300|4|2|the event of a sustained tariff increase on the|Y
01|234300|4|3|importation of this product.  Any surcharge will be|Y
01|234300|4|4|disclosed prior to acceptance of an order.|Y
01|234301|3|1|A tariff surcharge may be added to this quotation in|Y
01|234301|3|2|the event of a sustained tariff increase on the|Y
01|234301|3|3|importation of this product.  Any surcharge will be|Y
01|234301|3|4|disclosed prior to acceptance of an order.|Y
01|234302|2|1|A tariff surcharge may be added to this quotation in|Y
01|234302|2|2|the event of a sustained tariff increase on the|Y
01|234302|2|3|importation of this product.  Any surcharge will be|Y
01|234302|2|4|disclosed prior to acceptance of an order.|Y
01|234303|2|1|A tariff surcharge may be added to this quotation in|Y
01|234303|2|2|the event of a sustained tariff increase on the|Y
01|234303|2|3|importation of this product.  Any surcharge will be|Y
01|234303|2|4|disclosed prior to acceptance of an order.|Y
01|234304|2|1|A tariff surcharge may be added to this quotation in|Y
01|234304|2|2|the event of a sustained tariff increase on the|Y
01|234304|2|3|importation of this product.  Any surcharge will be|Y
01|234304|2|4|disclosed prior to acceptance of an order.|Y
01|234305|2|1|A tariff surcharge may be added to this quotation in|Y
01|234305|2|2|the event of a sustained tariff increase on the|Y
01|234305|2|3|importation of this product.  Any surcharge will be|Y
01|234305|2|4|disclosed prior to acceptance of an order.|Y
01|234306|3|1|A tariff surcharge may be added to this quotation in|Y
01|234306|3|2|the event of a sustained tariff increase on the|Y
01|234306|3|3|importation of this product.  Any surcharge will be|Y
01|234306|3|4|disclosed prior to acceptance of an order.|Y
01|234307|2|1|A tariff surcharge may be added to this quotation in|Y
01|234307|2|2|the event of a sustained tariff increase on the|Y
01|234307|2|3|importation of this product.  Any surcharge will be|Y
01|234307|2|4|disclosed prior to acceptance of an order.|Y
01|234308|3|1|A tariff surcharge may be added to this quotation in|Y
01|234308|3|2|the event of a sustained tariff increase on the|Y
01|234308|3|3|importation of this product.  Any surcharge will be|Y
01|234308|3|4|disclosed prior to acceptance of an order.|Y
01|234309|1|1|Please note current manufacturing time and delivery|Y
01|234309|1|2|is 4 months. Once PO/order has been placed this can't|Y
01|234309|1|3|be cancelled or returned.|Y
01|234309|2|1|A tariff surcharge may be added to this quotation in|Y
01|234309|2|2|the event of a sustained tariff increase on the|Y
01|234309|2|3|importation of this product.  Any surcharge will be|Y
01|234309|2|4|disclosed prior to acceptance of an order.|Y
01|234310|3|1|A tariff surcharge may be added to this quotation in|Y
01|234310|3|2|the event of a sustained tariff increase on the|Y
01|234310|3|3|importation of this product.  Any surcharge will be|Y
01|234310|3|4|disclosed prior to acceptance of an order.|Y
01|234311|3|1|A tariff surcharge may be added to this quotation in|Y
01|234311|3|2|the event of a sustained tariff increase on the|Y
01|234311|3|3|importation of this product.  Any surcharge will be|Y
01|234311|3|4|disclosed prior to acceptance of an order.|Y
01|234312|3|1|A tariff surcharge may be added to this quotation in|Y
01|234312|3|2|the event of a sustained tariff increase on the|Y
01|234312|3|3|importation of this product.  Any surcharge will be|Y
01|234312|3|4|disclosed prior to acceptance of an order.|Y
01|234313|3|1|A tariff surcharge may be added to this quotation in|Y
01|234313|3|2|the event of a sustained tariff increase on the|Y
01|234313|3|3|importation of this product.  Any surcharge will be|Y
01|234313|3|4|disclosed prior to acceptance of an order.|Y
01|234314|2|1|A tariff surcharge may be added to this quotation in|Y
01|234314|2|2|the event of a sustained tariff increase on the|Y
01|234314|2|3|importation of this product.  Any surcharge will be|Y
01|234314|2|4|disclosed prior to acceptance of an order.|Y
01|234315|2|1|A tariff surcharge may be added to this quotation in|Y
01|234315|2|2|the event of a sustained tariff increase on the|Y
01|234315|2|3|importation of this product.  Any surcharge will be|Y
01|234315|2|4|disclosed prior to acceptance of an order.|Y
01|234316|2|1|A tariff surcharge may be added to this quotation in|Y
01|234316|2|2|the event of a sustained tariff increase on the|Y
01|234316|2|3|importation of this product.  Any surcharge will be|Y
01|234316|2|4|disclosed prior to acceptance of an order.|Y
01|234317|3|1|A tariff surcharge may be added to this quotation in|Y
01|234317|3|2|the event of a sustained tariff increase on the|Y
01|234317|3|3|importation of this product.  Any surcharge will be|Y
01|234317|3|4|disclosed prior to acceptance of an order.|Y
01|234318|9|1|A tariff surcharge may be added to this quotation in|Y
01|234318|9|2|the event of a sustained tariff increase on the|Y
01|234318|9|3|importation of this product.  Any surcharge will be|Y
01|234318|9|4|disclosed prior to acceptance of an order.|Y
01|234319|6|1|A tariff surcharge may be added to this quotation in|Y
01|234319|6|2|the event of a sustained tariff increase on the|Y
01|234319|6|3|importation of this product.  Any surcharge will be|Y
01|234319|6|4|disclosed prior to acceptance of an order.|Y
01|234320|5|1|A tariff surcharge may be added to this quotation in|Y
01|234320|5|2|the event of a sustained tariff increase on the|Y
01|234320|5|3|importation of this product.  Any surcharge will be|Y
01|234320|5|4|disclosed prior to acceptance of an order.|Y
01|234321|2|1|A tariff surcharge may be added to this quotation in|Y
01|234321|2|2|the event of a sustained tariff increase on the|Y
01|234321|2|3|importation of this product.  Any surcharge will be|Y
01|234321|2|4|disclosed prior to acceptance of an order.|Y
01|234323|2|1|A tariff surcharge may be added to this quotation in|Y
01|234323|2|2|the event of a sustained tariff increase on the|Y
01|234323|2|3|importation of this product.  Any surcharge will be|Y
01|234323|2|4|disclosed prior to acceptance of an order.|Y
01|234324|5|1|A tariff surcharge may be added to this quotation in|Y
01|234324|5|2|the event of a sustained tariff increase on the|Y
01|234324|5|3|importation of this product.  Any surcharge will be|Y
01|234324|5|4|disclosed prior to acceptance of an order.|Y
01|234326|2|1|A tariff surcharge may be added to this quotation in|Y
01|234326|2|2|the event of a sustained tariff increase on the|Y
01|234326|2|3|importation of this product.  Any surcharge will be|Y
01|234326|2|4|disclosed prior to acceptance of an order.|Y
01|234327|1|1|PRE-E46BT1-V30|Y
01|234328|8|1|A tariff surcharge may be added to this quotation in|Y
01|234328|8|2|the event of a sustained tariff increase on the|Y
01|234328|8|3|importation of this product.  Any surcharge will be|Y
01|234328|8|4|disclosed prior to acceptance of an order.|Y
01|234329|2|1|A tariff surcharge may be added to this quotation in|Y
01|234329|2|2|the event of a sustained tariff increase on the|Y
01|234329|2|3|importation of this product.  Any surcharge will be|Y
01|234329|2|4|disclosed prior to acceptance of an order.|Y
01|234330|2|1|A tariff surcharge may be added to this quotation in|Y
01|234330|2|2|the event of a sustained tariff increase on the|Y
01|234330|2|3|importation of this product.  Any surcharge will be|Y
01|234330|2|4|disclosed prior to acceptance of an order.|Y
01|234331|2|1|A tariff surcharge may be added to this quotation in|Y
01|234331|2|2|the event of a sustained tariff increase on the|Y
01|234331|2|3|importation of this product.  Any surcharge will be|Y
01|234331|2|4|disclosed prior to acceptance of an order.|Y
01|234332|1|1|PRE-E46BAT1-V30|Y
01|234333|2|1|A tariff surcharge may be added to this quotation in|Y
01|234333|2|2|the event of a sustained tariff increase on the|Y
01|234333|2|3|importation of this product.  Any surcharge will be|Y
01|234333|2|4|disclosed prior to acceptance of an order.|Y
01|234334|2|1|A tariff surcharge may be added to this quotation in|Y
01|234334|2|2|the event of a sustained tariff increase on the|Y
01|234334|2|3|importation of this product.  Any surcharge will be|Y
01|234334|2|4|disclosed prior to acceptance of an order.|Y
01|234335|2|1|A tariff surcharge may be added to this quotation in|Y
01|234335|2|2|the event of a sustained tariff increase on the|Y
01|234335|2|3|importation of this product.  Any surcharge will be|Y
01|234335|2|4|disclosed prior to acceptance of an order.|Y
01|234336|2|1|A tariff surcharge may be added to this quotation in|Y
01|234336|2|2|the event of a sustained tariff increase on the|Y
01|234336|2|3|importation of this product.  Any surcharge will be|Y
01|234336|2|4|disclosed prior to acceptance of an order.|Y
01|234337|1|1|**Special non-standard stock. Cannot be cancelled|Y
01|234337|1|2|or returned upon receipt of PO**|Y
01|234337|26|1|A tariff surcharge may be added to this quotation in|Y
01|234337|26|2|the event of a sustained tariff increase on the|Y
01|234337|26|3|importation of this product.  Any surcharge will be|Y
01|234337|26|4|disclosed prior to acceptance of an order.|Y
01|234338|3|1|A tariff surcharge may be added to this quotation in|Y
01|234338|3|2|the event of a sustained tariff increase on the|Y
01|234338|3|3|importation of this product.  Any surcharge will be|Y
01|234338|3|4|disclosed prior to acceptance of an order.|Y
01|234339|24|1|A tariff surcharge may be added to this quotation in|Y
01|234339|24|2|the event of a sustained tariff increase on the|Y
01|234339|24|3|importation of this product.  Any surcharge will be|Y
01|234339|24|4|disclosed prior to acceptance of an order.|Y
01|234340|2|1|A tariff surcharge may be added to this quotation in|Y
01|234340|2|2|the event of a sustained tariff increase on the|Y
01|234340|2|3|importation of this product.  Any surcharge will be|Y
01|234340|2|4|disclosed prior to acceptance of an order.|Y
01|234341|2|1|A tariff surcharge may be added to this quotation in|Y
01|234341|2|2|the event of a sustained tariff increase on the|Y
01|234341|2|3|importation of this product.  Any surcharge will be|Y
01|234341|2|4|disclosed prior to acceptance of an order.|Y
01|234342|11|1|-$47.00|N
01|234342|11|2|danas|N
01|234342|12|1|A tariff surcharge may be added to this quotation in|Y
01|234342|12|2|the event of a sustained tariff increase on the|Y
01|234342|12|3|importation of this product.  Any surcharge will be|Y
01|234342|12|4|disclosed prior to acceptance of an order.|Y
01|234343|2|1|A tariff surcharge may be added to this quotation in|Y
01|234343|2|2|the event of a sustained tariff increase on the|Y
01|234343|2|3|importation of this product.  Any surcharge will be|Y
01|234343|2|4|disclosed prior to acceptance of an order.|Y
01|234344|2|1|A tariff surcharge may be added to this quotation in|Y
01|234344|2|2|the event of a sustained tariff increase on the|Y
01|234344|2|3|importation of this product.  Any surcharge will be|Y
01|234344|2|4|disclosed prior to acceptance of an order.|Y
01|234345|3|1|A tariff surcharge may be added to this quotation in|Y
01|234345|3|2|the event of a sustained tariff increase on the|Y
01|234345|3|3|importation of this product.  Any surcharge will be|Y
01|234345|3|4|disclosed prior to acceptance of an order.|Y
01|234346|2|1|A tariff surcharge may be added to this quotation in|Y
01|234346|2|2|the event of a sustained tariff increase on the|Y
01|234346|2|3|importation of this product.  Any surcharge will be|Y
01|234346|2|4|disclosed prior to acceptance of an order.|Y
01|234347|6|1|A tariff surcharge may be added to this quotation in|Y
01|234347|6|2|the event of a sustained tariff increase on the|Y
01|234347|6|3|importation of this product.  Any surcharge will be|Y
01|234347|6|4|disclosed prior to acceptance of an order.|Y
01|234348|2|1|A tariff surcharge may be added to this quotation in|Y
01|234348|2|2|the event of a sustained tariff increase on the|Y
01|234348|2|3|importation of this product.  Any surcharge will be|Y
01|234348|2|4|disclosed prior to acceptance of an order.|Y
01|234349|17|1|A tariff surcharge may be added to this quotation in|Y
01|234349|17|2|the event of a sustained tariff increase on the|Y
01|234349|17|3|importation of this product.  Any surcharge will be|Y
01|234349|17|4|disclosed prior to acceptance of an order.|Y
01|234350|4|1|A tariff surcharge may be added to this quotation in|Y
01|234350|4|2|the event of a sustained tariff increase on the|Y
01|234350|4|3|importation of this product.  Any surcharge will be|Y
01|234350|4|4|disclosed prior to acceptance of an order.|Y
01|234351|3|1|A tariff surcharge may be added to this quotation in|Y
01|234351|3|2|the event of a sustained tariff increase on the|Y
01|234351|3|3|importation of this product.  Any surcharge will be|Y
01|234351|3|4|disclosed prior to acceptance of an order.|Y
01|234352|9|1|A tariff surcharge may be added to this quotation in|Y
01|234352|9|2|the event of a sustained tariff increase on the|Y
01|234352|9|3|importation of this product.  Any surcharge will be|Y
01|234352|9|4|disclosed prior to acceptance of an order.|Y
01|234353|4|1|A tariff surcharge may be added to this quotation in|Y
01|234353|4|2|the event of a sustained tariff increase on the|Y
01|234353|4|3|importation of this product.  Any surcharge will be|Y
01|234353|4|4|disclosed prior to acceptance of an order.|Y
01|234354|37|1|A tariff surcharge may be added to this quotation in|Y
01|234354|37|2|the event of a sustained tariff increase on the|Y
01|234354|37|3|importation of this product.  Any surcharge will be|Y
01|234354|37|4|disclosed prior to acceptance of an order.|Y
01|234355|4|1|A tariff surcharge may be added to this quotation in|Y
01|234355|4|2|the event of a sustained tariff increase on the|Y
01|234355|4|3|importation of this product.  Any surcharge will be|Y
01|234355|4|4|disclosed prior to acceptance of an order.|Y
01|234356|3|1|A tariff surcharge may be added to this quotation in|Y
01|234356|3|2|the event of a sustained tariff increase on the|Y
01|234356|3|3|importation of this product.  Any surcharge will be|Y
01|234356|3|4|disclosed prior to acceptance of an order.|Y
01|234357|2|1|A tariff surcharge may be added to this quotation in|Y
01|234357|2|2|the event of a sustained tariff increase on the|Y
01|234357|2|3|importation of this product.  Any surcharge will be|Y
01|234357|2|4|disclosed prior to acceptance of an order.|Y
01|234358|4|1|A tariff surcharge may be added to this quotation in|Y
01|234358|4|2|the event of a sustained tariff increase on the|Y
01|234358|4|3|importation of this product.  Any surcharge will be|Y
01|234358|4|4|disclosed prior to acceptance of an order.|Y
01|234359|7|1|A tariff surcharge may be added to this quotation in|Y
01|234359|7|2|the event of a sustained tariff increase on the|Y
01|234359|7|3|importation of this product.  Any surcharge will be|Y
01|234359|7|4|disclosed prior to acceptance of an order.|Y
01|234360|3|1|A tariff surcharge may be added to this quotation in|Y
01|234360|3|2|the event of a sustained tariff increase on the|Y
01|234360|3|3|importation of this product.  Any surcharge will be|Y
01|234360|3|4|disclosed prior to acceptance of an order.|Y
01|234361|5|1|A tariff surcharge may be added to this quotation in|Y
01|234361|5|2|the event of a sustained tariff increase on the|Y
01|234361|5|3|importation of this product.  Any surcharge will be|Y
01|234361|5|4|disclosed prior to acceptance of an order.|Y
01|234362|3|1|A tariff surcharge may be added to this quotation in|Y
01|234362|3|2|the event of a sustained tariff increase on the|Y
01|234362|3|3|importation of this product.  Any surcharge will be|Y
01|234362|3|4|disclosed prior to acceptance of an order.|Y
01|234363|2|1|A tariff surcharge may be added to this quotation in|Y
01|234363|2|2|the event of a sustained tariff increase on the|Y
01|234363|2|3|importation of this product.  Any surcharge will be|Y
01|234363|2|4|disclosed prior to acceptance of an order.|Y
01|234365|2|1|A tariff surcharge may be added to this quotation in|Y
01|234365|2|2|the event of a sustained tariff increase on the|Y
01|234365|2|3|importation of this product.  Any surcharge will be|Y
01|234365|2|4|disclosed prior to acceptance of an order.|Y
01|234366|2|1|A tariff surcharge may be added to this quotation in|Y
01|234366|2|2|the event of a sustained tariff increase on the|Y
01|234366|2|3|importation of this product.  Any surcharge will be|Y
01|234366|2|4|disclosed prior to acceptance of an order.|Y
01|234367|4|1|A tariff surcharge may be added to this quotation in|Y
01|234367|4|2|the event of a sustained tariff increase on the|Y
01|234367|4|3|importation of this product.  Any surcharge will be|Y
01|234367|4|4|disclosed prior to acceptance of an order.|Y
01|234368|2|1|A tariff surcharge may be added to this quotation in|Y
01|234368|2|2|the event of a sustained tariff increase on the|Y
01|234368|2|3|importation of this product.  Any surcharge will be|Y
01|234368|2|4|disclosed prior to acceptance of an order.|Y
01|234369|10|1|A tariff surcharge may be added to this quotation in|Y
01|234369|10|2|the event of a sustained tariff increase on the|Y
01|234369|10|3|importation of this product.  Any surcharge will be|Y
01|234369|10|4|disclosed prior to acceptance of an order.|Y
01|234370|5|1|A tariff surcharge may be added to this quotation in|Y
01|234370|5|2|the event of a sustained tariff increase on the|Y
01|234370|5|3|importation of this product.  Any surcharge will be|Y
01|234370|5|4|disclosed prior to acceptance of an order.|Y
01|234371|3|1|A tariff surcharge may be added to this quotation in|Y
01|234371|3|2|the event of a sustained tariff increase on the|Y
01|234371|3|3|importation of this product.  Any surcharge will be|Y
01|234371|3|4|disclosed prior to acceptance of an order.|Y
01|234372|3|1|Lyndex Nikken will integrate the rotary table into the|Y
01|234372|3|2|Hardinge V480 VMC and control.  This is a NET Charge.|Y
01|234372|12|1|A tariff surcharge may be added to this quotation in|Y
01|234372|12|2|the event of a sustained tariff increase on the|Y
01|234372|12|3|importation of this product.  Any surcharge will be|Y
01|234372|12|4|disclosed prior to acceptance of an order.|Y
01|234374|3|1|A tariff surcharge may be added to this quotation in|Y
01|234374|3|2|the event of a sustained tariff increase on the|Y
01|234374|3|3|importation of this product.  Any surcharge will be|Y
01|234374|3|4|disclosed prior to acceptance of an order.|Y
01|234375|3|1|A tariff surcharge may be added to this quotation in|Y
01|234375|3|2|the event of a sustained tariff increase on the|Y
01|234375|3|3|importation of this product.  Any surcharge will be|Y
01|234375|3|4|disclosed prior to acceptance of an order.|Y
01|234376|1|1|Accupro/MSC Cross:  80263882|Y
01|234376|2|1|Accupro/MSC Cross:  80263940|Y
01|234376|3|1|Accupro/MSC Cross:  80263825|Y
01|234376|4|1|Accupro/MSC Cross:  80264013|Y
01|234376|5|1|Accupro/MSC Cross:  80265218|Y
01|234376|7|1|Accupro/MSC Cross:  80265234 (2.50 Projection)|Y
01|234376|8|1|Accupro/MSC Cross:  80265259 (4.00 Projection)|Y
01|234376|10|1|Accupro/MSC Cross:  80265333 (2.50 Projection)|Y
01|234376|13|1|Accupro/MSC Cross:  05733134 (2.95 Projection)|Y
01|234376|15|1|A tariff surcharge may be added to this quotation in|Y
01|234376|15|2|the event of a sustained tariff increase on the|Y
01|234376|15|3|importation of this product.  Any surcharge will be|Y
01|234376|15|4|disclosed prior to acceptance of an order.|Y
01|234377|3|1|A tariff surcharge may be added to this quotation in|Y
01|234377|3|2|the event of a sustained tariff increase on the|Y
01|234377|3|3|importation of this product.  Any surcharge will be|Y
01|234377|3|4|disclosed prior to acceptance of an order.|Y
01|234378|2|1|A tariff surcharge may be added to this quotation in|Y
01|234378|2|2|the event of a sustained tariff increase on the|Y
01|234378|2|3|importation of this product.  Any surcharge will be|Y
01|234378|2|4|disclosed prior to acceptance of an order.|Y
01|234379|11|1|A tariff surcharge may be added to this quotation in|Y
01|234379|11|2|the event of a sustained tariff increase on the|Y
01|234379|11|3|importation of this product.  Any surcharge will be|Y
01|234379|11|4|disclosed prior to acceptance of an order.|Y
01|234380|17|1|1 currently on the shelf and remaining piece set to|Y
01|234380|17|2|arrive to warehouse mid August.|Y
01|234380|95|1|A tariff surcharge may be added to this quotation in|Y
01|234380|95|2|the event of a sustained tariff increase on the|Y
01|234380|95|3|importation of this product.  Any surcharge will be|Y
01|234380|95|4|disclosed prior to acceptance of an order.|Y
01|234381|5|1|A tariff surcharge may be added to this quotation in|Y
01|234381|5|2|the event of a sustained tariff increase on the|Y
01|234381|5|3|importation of this product.  Any surcharge will be|Y
01|234381|5|4|disclosed prior to acceptance of an order.|Y
01|234382|3|1|A tariff surcharge may be added to this quotation in|Y
01|234382|3|2|the event of a sustained tariff increase on the|Y
01|234382|3|3|importation of this product.  Any surcharge will be|Y
01|234382|3|4|disclosed prior to acceptance of an order.|Y
01|234383|3|1|A tariff surcharge may be added to this quotation in|Y
01|234383|3|2|the event of a sustained tariff increase on the|Y
01|234383|3|3|importation of this product.  Any surcharge will be|Y
01|234383|3|4|disclosed prior to acceptance of an order.|Y
01|234384|6|1|A tariff surcharge may be added to this quotation in|Y
01|234384|6|2|the event of a sustained tariff increase on the|Y
01|234384|6|3|importation of this product.  Any surcharge will be|Y
01|234384|6|4|disclosed prior to acceptance of an order.|Y
01|234385|2|1|A tariff surcharge may be added to this quotation in|Y
01|234385|2|2|the event of a sustained tariff increase on the|Y
01|234385|2|3|importation of this product.  Any surcharge will be|Y
01|234385|2|4|disclosed prior to acceptance of an order.|Y
01|234386|2|1|A tariff surcharge may be added to this quotation in|Y
01|234386|2|2|the event of a sustained tariff increase on the|Y
01|234386|2|3|importation of this product.  Any surcharge will be|Y
01|234386|2|4|disclosed prior to acceptance of an order.|Y
01|234387|2|1|A tariff surcharge may be added to this quotation in|Y
01|234387|2|2|the event of a sustained tariff increase on the|Y
01|234387|2|3|importation of this product.  Any surcharge will be|Y
01|234387|2|4|disclosed prior to acceptance of an order.|Y
01|234388|2|1|A tariff surcharge may be added to this quotation in|Y
01|234388|2|2|the event of a sustained tariff increase on the|Y
01|234388|2|3|importation of this product.  Any surcharge will be|Y
01|234388|2|4|disclosed prior to acceptance of an order.|Y
01|234389|2|1|Per Howa If the machine is an Okuma verticle lathe|Y
01|234389|2|2|they recommend this chuck.|Y
01|234389|3|1|H01MA15 R-1772 >> VTL Std Close Bore 3J Flat Back 3mm|Y
01|234390|1|1|Part Number to Be Determined|Y
01|234390|1|2|HSK40A & HSK40E Testbar 24mm X 180mm w/Wooden Case|Y
01|234390|1|3|Quoted at NET price.|Y
01|234390|2|1|A tariff surcharge may be added to this quotation in|Y
01|234390|2|2|the event of a sustained tariff increase on the|Y
01|234390|2|3|importation of this product.  Any surcharge will be|Y
01|234390|2|4|disclosed prior to acceptance of an order.|Y
01|234391|2|1|A tariff surcharge may be added to this quotation in|Y
01|234391|2|2|the event of a sustained tariff increase on the|Y
01|234391|2|3|importation of this product.  Any surcharge will be|Y
01|234391|2|4|disclosed prior to acceptance of an order.|Y
01|234392|2|1|A tariff surcharge may be added to this quotation in|Y
01|234392|2|2|the event of a sustained tariff increase on the|Y
01|234392|2|3|importation of this product.  Any surcharge will be|Y
01|234392|2|4|disclosed prior to acceptance of an order.|Y
01|234393|3|1|A tariff surcharge may be added to this quotation in|Y
01|234393|3|2|the event of a sustained tariff increase on the|Y
01|234393|3|3|importation of this product.  Any surcharge will be|Y
01|234393|3|4|disclosed prior to acceptance of an order.|Y
01|234394|1|1|RGA#TAR-61999|Y
01|234394|1|2|5AX-201FA-M SN:1117|Y
01|234394|20|1|A tariff surcharge may be added to this quotation in|Y
01|234394|20|2|the event of a sustained tariff increase on the|Y
01|234394|20|3|importation of this product.  Any surcharge will be|Y
01|234394|20|4|disclosed prior to acceptance of an order.|Y
01|234395|2|1|A tariff surcharge may be added to this quotation in|Y
01|234395|2|2|the event of a sustained tariff increase on the|Y
01|234395|2|3|importation of this product.  Any surcharge will be|Y
01|234395|2|4|disclosed prior to acceptance of an order.|Y
01|234396|1|1|THIS VICE REQUIRES AN ADAPTER PLATE BE MANUFACTURED|Y
01|234396|1|2|TO MOUNT TO THE EXISTING KOMA TABLE AND ROTARY UNION.|Y
01|234396|1|3|ADAPTER PLATE NEEDS TO ROUTE THE AIR TO THE VICE.|Y
01|234396|1|4|2 AIR PORTS REQUIRED FOR VICE FUNCTION.|Y
01|234396|1|5|ADAPTER PLATE NOT QUOTED.|Y
01|234396|2|1|https://tinyurl.com/327pspsr|Y
01|234396|2|2|ROUGH - GRIP JAWS|Y
01|234396|3|3|AS QUOTED A ROTARY UNION IS REQUIRED FOR THE VICE TO|Y
01|234396|3|4|FUNCTION.|Y
01|234396|5|1|https://www.nachirobotics.com/product/mz10lf/|Y
01|234396|5|2|10 KG PAYLOAD - 1202mm REACH|Y
01|234396|10|1|SERVO DRIVEN AUTODOOR FOR OKUMA 52 INCH SINGLE DOOR|Y
01|234396|10|2|OPENING - INSTALLED ON OPERATOR DOOR.|Y
01|234396|11|1|FINAL INSTALLATION DATE DETERMINED AFTER PO AND|Y
01|234396|11|2|DEPOSIT ARE RECEIVED.|Y
01|234396|11|3|INSTALLATION INCLUDES: UNBOXING AND PLACING EZ-COB|Y
01|234396|11|4|IN FRONT OF CNC MILL.  WIRING COMMUNICATION ON CNC|Y
01|234396|11|5|MACHINE SIDE. INTEGRATING EZ-COB TO CNC MACHINE.|Y
01|234396|11|6|MOUNTING AND INTEGRATING AUTODOOR TO CNC MACHINE AND|Y
01|234396|11|7|EZ-COB|Y
01|234397|2|1|A tariff surcharge may be added to this quotation in|Y
01|234397|2|2|the event of a sustained tariff increase on the|Y
01|234397|2|3|importation of this product.  Any surcharge will be|Y
01|234397|2|4|disclosed prior to acceptance of an order.|Y
01|234398|2|1|A tariff surcharge may be added to this quotation in|Y
01|234398|2|2|the event of a sustained tariff increase on the|Y
01|234398|2|3|importation of this product.  Any surcharge will be|Y
01|234398|2|4|disclosed prior to acceptance of an order.|Y
01|234399|2|1|A tariff surcharge may be added to this quotation in|Y
01|234399|2|2|the event of a sustained tariff increase on the|Y
01|234399|2|3|importation of this product.  Any surcharge will be|Y
01|234399|2|4|disclosed prior to acceptance of an order.|Y
01|234400|37|1|A tariff surcharge may be added to this quotation in|Y
01|234400|37|2|the event of a sustained tariff increase on the|Y
01|234400|37|3|importation of this product.  Any surcharge will be|Y
01|234400|37|4|disclosed prior to acceptance of an order.|Y
01|234401|6|1|A tariff surcharge may be added to this quotation in|Y
01|234401|6|2|the event of a sustained tariff increase on the|Y
01|234401|6|3|importation of this product.  Any surcharge will be|Y
01|234401|6|4|disclosed prior to acceptance of an order.|Y
01|234402|3|1|A tariff surcharge may be added to this quotation in|Y
01|234402|3|2|the event of a sustained tariff increase on the|Y
01|234402|3|3|importation of this product.  Any surcharge will be|Y
01|234402|3|4|disclosed prior to acceptance of an order.|Y
01|234403|2|1|A tariff surcharge may be added to this quotation in|Y
01|234403|2|2|the event of a sustained tariff increase on the|Y
01|234403|2|3|importation of this product.  Any surcharge will be|Y
01|234403|2|4|disclosed prior to acceptance of an order.|Y
01|234404|9|1|A tariff surcharge may be added to this quotation in|Y
01|234404|9|2|the event of a sustained tariff increase on the|Y
01|234404|9|3|importation of this product.  Any surcharge will be|Y
01|234404|9|4|disclosed prior to acceptance of an order.|Y
01|234405|3|1|A tariff surcharge may be added to this quotation in|Y
01|234405|3|2|the event of a sustained tariff increase on the|Y
01|234405|3|3|importation of this product.  Any surcharge will be|Y
01|234405|3|4|disclosed prior to acceptance of an order.|Y
01|234406|6|1|A tariff surcharge may be added to this quotation in|Y
01|234406|6|2|the event of a sustained tariff increase on the|Y
01|234406|6|3|importation of this product.  Any surcharge will be|Y
01|234406|6|4|disclosed prior to acceptance of an order.|Y
01|234407|1|1|WRENCHES INCLUDED|Y
01|234407|1|2|+5% DISCOUNT|Y
01|234407|2|1|A tariff surcharge may be added to this quotation in|Y
01|234407|2|2|the event of a sustained tariff increase on the|Y
01|234407|2|3|importation of this product.  Any surcharge will be|Y
01|234407|2|4|disclosed prior to acceptance of an order.|Y
01|234408|4|1|Quantity Break Net Pricing:|Y
01|234408|4|2|1pc:  $27430.00 ea/net|Y
01|234408|4|3|2pc+: $19706.00 ea/net|Y
01|234408|29|1|A tariff surcharge may be added to this quotation in|Y
01|234408|29|2|the event of a sustained tariff increase on the|Y
01|234408|29|3|importation of this product.  Any surcharge will be|Y
01|234408|29|4|disclosed prior to acceptance of an order.|Y
01|234409|2|1|A tariff surcharge may be added to this quotation in|Y
01|234409|2|2|the event of a sustained tariff increase on the|Y
01|234409|2|3|importation of this product.  Any surcharge will be|Y
01|234409|2|4|disclosed prior to acceptance of an order.|Y
01|234410|2|1|A tariff surcharge may be added to this quotation in|Y
01|234410|2|2|the event of a sustained tariff increase on the|Y
01|234410|2|3|importation of this product.  Any surcharge will be|Y
01|234410|2|4|disclosed prior to acceptance of an order.|Y
01|234411|4|1|A tariff surcharge may be added to this quotation in|Y
01|234411|4|2|the event of a sustained tariff increase on the|Y
01|234411|4|3|importation of this product.  Any surcharge will be|Y
01|234411|4|4|disclosed prior to acceptance of an order.|Y
01|234412|4|1|A tariff surcharge may be added to this quotation in|Y
01|234412|4|2|the event of a sustained tariff increase on the|Y
01|234412|4|3|importation of this product.  Any surcharge will be|Y
01|234412|4|4|disclosed prior to acceptance of an order.|Y
01|234414|2|1|A tariff surcharge may be added to this quotation in|Y
01|234414|2|2|the event of a sustained tariff increase on the|Y
01|234414|2|3|importation of this product.  Any surcharge will be|Y
01|234414|2|4|disclosed prior to acceptance of an order.|Y
01|234415|3|1|A tariff surcharge may be added to this quotation in|Y
01|234415|3|2|the event of a sustained tariff increase on the|Y
01|234415|3|3|importation of this product.  Any surcharge will be|Y
01|234415|3|4|disclosed prior to acceptance of an order.|Y
01|234416|2|1|A tariff surcharge may be added to this quotation in|Y
01|234416|2|2|the event of a sustained tariff increase on the|Y
01|234416|2|3|importation of this product.  Any surcharge will be|Y
01|234416|2|4|disclosed prior to acceptance of an order.|Y
01|234417|5|1|A tariff surcharge may be added to this quotation in|Y
01|234417|5|2|the event of a sustained tariff increase on the|Y
01|234417|5|3|importation of this product.  Any surcharge will be|Y
01|234417|5|4|disclosed prior to acceptance of an order.|Y
01|234418|2|1|A tariff surcharge may be added to this quotation in|Y
01|234418|2|2|the event of a sustained tariff increase on the|Y
01|234418|2|3|importation of this product.  Any surcharge will be|Y
01|234418|2|4|disclosed prior to acceptance of an order.|Y
01|234419|2|1|A tariff surcharge may be added to this quotation in|Y
01|234419|2|2|the event of a sustained tariff increase on the|Y
01|234419|2|3|importation of this product.  Any surcharge will be|Y
01|234419|2|4|disclosed prior to acceptance of an order.|Y
01|234420|20|1|A tariff surcharge may be added to this quotation in|Y
01|234420|20|2|the event of a sustained tariff increase on the|Y
01|234420|20|3|importation of this product.  Any surcharge will be|Y
01|234420|20|4|disclosed prior to acceptance of an order.|Y
01|234421|7|1|A tariff surcharge may be added to this quotation in|Y
01|234421|7|2|the event of a sustained tariff increase on the|Y
01|234421|7|3|importation of this product.  Any surcharge will be|Y
01|234421|7|4|disclosed prior to acceptance of an order.|Y
01|234422|2|1|A tariff surcharge may be added to this quotation in|Y
01|234422|2|2|the event of a sustained tariff increase on the|Y
01|234422|2|3|importation of this product.  Any surcharge will be|Y
01|234422|2|4|disclosed prior to acceptance of an order.|Y
01|234423|3|1|New Part # B4007-0016-5.00G We will remove the|Y
01|234423|3|2|bearing nut and install the Smooth nut on this holder.|Y
01|234423|3|3|Part number will be created upon receipt of order.|Y
01|234423|4|1|A tariff surcharge may be added to this quotation in|Y
01|234423|4|2|the event of a sustained tariff increase on the|Y
01|234423|4|3|importation of this product.  Any surcharge will be|Y
01|234423|4|4|disclosed prior to acceptance of an order.|Y
01|234424|2|1|A tariff surcharge may be added to this quotation in|Y
01|234424|2|2|the event of a sustained tariff increase on the|Y
01|234424|2|3|importation of this product.  Any surcharge will be|Y
01|234424|2|4|disclosed prior to acceptance of an order.|Y
01|234425|33|1|A tariff surcharge may be added to this quotation in|Y
01|234425|33|2|the event of a sustained tariff increase on the|Y
01|234425|33|3|importation of this product.  Any surcharge will be|Y
01|234425|33|4|disclosed prior to acceptance of an order.|Y
01|234426|2|1|A tariff surcharge may be added to this quotation in|Y
01|234426|2|2|the event of a sustained tariff increase on the|Y
01|234426|2|3|importation of this product.  Any surcharge will be|Y
01|234426|2|4|disclosed prior to acceptance of an order.|Y
01|234427|1|1|Pais de Origen: Italia|Y
01|234427|2|1|Pais de Origen: Italia|Y
01|234427|3|1|Pais de Origen: China|Y
01|234427|4|1|Pais de Origen: China|Y
01|234427|5|1|Pais de Origen: Italia|Y
01|234427|7|1|A tariff surcharge may be added to this quotation in|Y
01|234427|7|2|the event of a sustained tariff increase on the|Y
01|234427|7|3|importation of this product.  Any surcharge will be|Y
01|234427|7|4|disclosed prior to acceptance of an order.|Y
01|234428|3|1|A tariff surcharge may be added to this quotation in|Y
01|234428|3|2|the event of a sustained tariff increase on the|Y
01|234428|3|3|importation of this product.  Any surcharge will be|Y
01|234428|3|4|disclosed prior to acceptance of an order.|Y
01|234429|3|1|A tariff surcharge may be added to this quotation in|Y
01|234429|3|2|the event of a sustained tariff increase on the|Y
01|234429|3|3|importation of this product.  Any surcharge will be|Y
01|234429|3|4|disclosed prior to acceptance of an order.|Y
01|234430|2|1|A tariff surcharge may be added to this quotation in|Y
01|234430|2|2|the event of a sustained tariff increase on the|Y
01|234430|2|3|importation of this product.  Any surcharge will be|Y
01|234430|2|4|disclosed prior to acceptance of an order.|Y
01|234431|2|1|A tariff surcharge may be added to this quotation in|Y
01|234431|2|2|the event of a sustained tariff increase on the|Y
01|234431|2|3|importation of this product.  Any surcharge will be|Y
01|234431|2|4|disclosed prior to acceptance of an order.|Y
01|234432|3|1|A tariff surcharge may be added to this quotation in|Y
01|234432|3|2|the event of a sustained tariff increase on the|Y
01|234432|3|3|importation of this product.  Any surcharge will be|Y
01|234432|3|4|disclosed prior to acceptance of an order.|Y
01|234433|33|1|A tariff surcharge may be added to this quotation in|Y
01|234433|33|2|the event of a sustained tariff increase on the|Y
01|234433|33|3|importation of this product.  Any surcharge will be|Y
01|234433|33|4|disclosed prior to acceptance of an order.|Y
01|234434|3|1|A tariff surcharge may be added to this quotation in|Y
01|234434|3|2|the event of a sustained tariff increase on the|Y
01|234434|3|3|importation of this product.  Any surcharge will be|Y
01|234434|3|4|disclosed prior to acceptance of an order.|Y
01|234435|1|1|Please note: This item is special non-standard stock.|Y
01|234435|1|2|Once a PO is placed it cannot be cancelled or returned|Y
01|234435|1|3|**QTY BREAK NET PRICING:|Y
01|234435|1|4|250-499 pcs: $28.00 ea/net|Y
01|234435|1|5|500-999 pcs: $24.00 ea/net|Y
01|234435|1|6|1000+   pcs: $22.00 ea/net|Y
01|234435|1|7|**PRICING IS VALID UNTIL 12/31/25**|Y
01|234435|2|1|A tariff surcharge may be added to this quotation in|Y
01|234435|2|2|the event of a sustained tariff increase on the|Y
01|234435|2|3|importation of this product.  Any surcharge will be|Y
01|234435|2|4|disclosed prior to acceptance of an order.|Y
01|234436|2|1|Please note additional 20% applied per overstock promo.|Y
01|234436|2|2|Once PO/order has been issued these can't be cancelled|Y
01|234436|2|3|or returned.|Y
01|234436|3|1|A tariff surcharge may be added to this quotation in|Y
01|234436|3|2|the event of a sustained tariff increase on the|Y
01|234436|3|3|importation of this product.  Any surcharge will be|Y
01|234436|3|4|disclosed prior to acceptance of an order.|Y
01|234437|3|1|A tariff surcharge may be added to this quotation in|Y
01|234437|3|2|the event of a sustained tariff increase on the|Y
01|234437|3|3|importation of this product.  Any surcharge will be|Y
01|234437|3|4|disclosed prior to acceptance of an order.|Y
01|234438|4|1|A tariff surcharge may be added to this quotation in|Y
01|234438|4|2|the event of a sustained tariff increase on the|Y
01|234438|4|3|importation of this product.  Any surcharge will be|Y
01|234438|4|4|disclosed prior to acceptance of an order.|Y
01|234439|4|1|A tariff surcharge may be added to this quotation in|Y
01|234439|4|2|the event of a sustained tariff increase on the|Y
01|234439|4|3|importation of this product.  Any surcharge will be|Y
01|234439|4|4|disclosed prior to acceptance of an order.|Y
01|234440|5|1|A tariff surcharge may be added to this quotation in|Y
01|234440|5|2|the event of a sustained tariff increase on the|Y
01|234440|5|3|importation of this product.  Any surcharge will be|Y
01|234440|5|4|disclosed prior to acceptance of an order.|Y
01|234441|6|1|A tariff surcharge may be added to this quotation in|Y
01|234441|6|2|the event of a sustained tariff increase on the|Y
01|234441|6|3|importation of this product.  Any surcharge will be|Y
01|234441|6|4|disclosed prior to acceptance of an order.|Y
01|234442|13|1|A tariff surcharge may be added to this quotation in|Y
01|234442|13|2|the event of a sustained tariff increase on the|Y
01|234442|13|3|importation of this product.  Any surcharge will be|Y
01|234442|13|4|disclosed prior to acceptance of an order.|Y
01|234443|5|1|A tariff surcharge may be added to this quotation in|Y
01|234443|5|2|the event of a sustained tariff increase on the|Y
01|234443|5|3|importation of this product.  Any surcharge will be|Y
01|234443|5|4|disclosed prior to acceptance of an order.|Y
01|234444|4|1|A tariff surcharge may be added to this quotation in|Y
01|234444|4|2|the event of a sustained tariff increase on the|Y
01|234444|4|3|importation of this product.  Any surcharge will be|Y
01|234444|4|4|disclosed prior to acceptance of an order.|Y
01|234445|6|1|A tariff surcharge may be added to this quotation in|Y
01|234445|6|2|the event of a sustained tariff increase on the|Y
01|234445|6|3|importation of this product.  Any surcharge will be|Y
01|234445|6|4|disclosed prior to acceptance of an order.|Y
01|234446|12|1|A tariff surcharge may be added to this quotation in|Y
01|234446|12|2|the event of a sustained tariff increase on the|Y
01|234446|12|3|importation of this product.  Any surcharge will be|Y
01|234446|12|4|disclosed prior to acceptance of an order.|Y
01|234447|2|1|*** Std Disc 28% ***|Y
01|234447|3|1|*** Std Disc 28% ***|Y
01|234447|4|1|*** Std Disc 25% ***|Y
01|234447|5|1|*** Std Disc 28% ***|Y
01|234447|6|1|A tariff surcharge may be added to this quotation in|Y
01|234447|6|2|the event of a sustained tariff increase on the|Y
01|234447|6|3|importation of this product.  Any surcharge will be|Y
01|234447|6|4|disclosed prior to acceptance of an order.|Y
01|234448|8|1|A tariff surcharge may be added to this quotation in|Y
01|234448|8|2|the event of a sustained tariff increase on the|Y
01|234448|8|3|importation of this product.  Any surcharge will be|Y
01|234448|8|4|disclosed prior to acceptance of an order.|Y
01|234449|2|1|A tariff surcharge may be added to this quotation in|Y
01|234449|2|2|the event of a sustained tariff increase on the|Y
01|234449|2|3|importation of this product.  Any surcharge will be|Y
01|234449|2|4|disclosed prior to acceptance of an order.|Y
01|234450|2|1|A tariff surcharge may be added to this quotation in|Y
01|234450|2|2|the event of a sustained tariff increase on the|Y
01|234450|2|3|importation of this product.  Any surcharge will be|Y
01|234450|2|4|disclosed prior to acceptance of an order.|Y
01|234451|3|1|A tariff surcharge may be added to this quotation in|Y
01|234451|3|2|the event of a sustained tariff increase on the|Y
01|234451|3|3|importation of this product.  Any surcharge will be|Y
01|234451|3|4|disclosed prior to acceptance of an order.|Y
01|234452|7|1|A tariff surcharge may be added to this quotation in|Y
01|234452|7|2|the event of a sustained tariff increase on the|Y
01|234452|7|3|importation of this product.  Any surcharge will be|Y
01|234452|7|4|disclosed prior to acceptance of an order.|Y
01|234453|2|1|A tariff surcharge may be added to this quotation in|Y
01|234453|2|2|the event of a sustained tariff increase on the|Y
01|234453|2|3|importation of this product.  Any surcharge will be|Y
01|234453|2|4|disclosed prior to acceptance of an order.|Y
01|234454|2|1|A tariff surcharge may be added to this quotation in|Y
01|234454|2|2|the event of a sustained tariff increase on the|Y
01|234454|2|3|importation of this product.  Any surcharge will be|Y
01|234454|2|4|disclosed prior to acceptance of an order.|Y
01|234455|1|1|Final Part# CAT40-CZF1.1/4-120U-IDU **NET PRICE**|Y
01|234455|1|2|CAT40 BullsEye ZeroFit Milling Chuck C1.1/4 120mm GL|Y
01|234455|1|3|QTY NET PRICE BRK:|Y
01|234455|1|4|1-9 pcs: $1052.00|Y
01|234455|1|5|10-24 pcs: $958.00|Y
01|234455|1|6|25-49 pcs: $932.00|Y
01|234455|1|7|50-99 pcs: $782.00|Y
01|234455|1|8|100+ pcs:  $613.00|Y
01|234455|1|9|.|Y
01|234455|1|10|DELIVERY: 14 - 16 Weeks ARO|Y
01|234455|6|1|A tariff surcharge may be added to this quotation in|Y
01|234455|6|2|the event of a sustained tariff increase on the|Y
01|234455|6|3|importation of this product.  Any surcharge will be|Y
01|234455|6|4|disclosed prior to acceptance of an order.|Y
01|234456|2|1|A tariff surcharge may be added to this quotation in|Y
01|234456|2|2|the event of a sustained tariff increase on the|Y
01|234456|2|3|importation of this product.  Any surcharge will be|Y
01|234456|2|4|disclosed prior to acceptance of an order.|Y
01|234457|7|1|A tariff surcharge may be added to this quotation in|Y
01|234457|7|2|the event of a sustained tariff increase on the|Y
01|234457|7|3|importation of this product.  Any surcharge will be|Y
01|234457|7|4|disclosed prior to acceptance of an order.|Y
01|234459|3|1|A tariff surcharge may be added to this quotation in|Y
01|234459|3|2|the event of a sustained tariff increase on the|Y
01|234459|3|3|importation of this product.  Any surcharge will be|Y
01|234459|3|4|disclosed prior to acceptance of an order.|Y
01|234460|2|1|A tariff surcharge may be added to this quotation in|Y
01|234460|2|2|the event of a sustained tariff increase on the|Y
01|234460|2|3|importation of this product.  Any surcharge will be|Y
01|234460|2|4|disclosed prior to acceptance of an order.|Y
01|234461|7|1|A tariff surcharge may be added to this quotation in|Y
01|234461|7|2|the event of a sustained tariff increase on the|Y
01|234461|7|3|importation of this product.  Any surcharge will be|Y
01|234461|7|4|disclosed prior to acceptance of an order.|Y
01|234462|2|1|A tariff surcharge may be added to this quotation in|Y
01|234462|2|2|the event of a sustained tariff increase on the|Y
01|234462|2|3|importation of this product.  Any surcharge will be|Y
01|234462|2|4|disclosed prior to acceptance of an order.|Y
01|234463|2|1|A tariff surcharge may be added to this quotation in|Y
01|234463|2|2|the event of a sustained tariff increase on the|Y
01|234463|2|3|importation of this product.  Any surcharge will be|Y
01|234463|2|4|disclosed prior to acceptance of an order.|Y
01|234464|12|1|A tariff surcharge may be added to this quotation in|Y
01|234464|12|2|the event of a sustained tariff increase on the|Y
01|234464|12|3|importation of this product.  Any surcharge will be|Y
01|234464|12|4|disclosed prior to acceptance of an order.|Y
01|234465|4|1|A tariff surcharge may be added to this quotation in|Y
01|234465|4|2|the event of a sustained tariff increase on the|Y
01|234465|4|3|importation of this product.  Any surcharge will be|Y
01|234465|4|4|disclosed prior to acceptance of an order.|Y
01|234466|5|1|A tariff surcharge may be added to this quotation in|Y
01|234466|5|2|the event of a sustained tariff increase on the|Y
01|234466|5|3|importation of this product.  Any surcharge will be|Y
01|234466|5|4|disclosed prior to acceptance of an order.|Y
01|234467|2|1|A tariff surcharge may be added to this quotation in|Y
01|234467|2|2|the event of a sustained tariff increase on the|Y
01|234467|2|3|importation of this product.  Any surcharge will be|Y
01|234467|2|4|disclosed prior to acceptance of an order.|Y
01|234469|2|1|A tariff surcharge may be added to this quotation in|Y
01|234469|2|2|the event of a sustained tariff increase on the|Y
01|234469|2|3|importation of this product.  Any surcharge will be|Y
01|234469|2|4|disclosed prior to acceptance of an order.|Y
01|234470|2|1|A tariff surcharge may be added to this quotation in|Y
01|234470|2|2|the event of a sustained tariff increase on the|Y
01|234470|2|3|importation of this product.  Any surcharge will be|Y
01|234470|2|4|disclosed prior to acceptance of an order.|Y
01|234471|27|1|Please note this is non-standard stock and considered|Y
01|234471|27|2|a special. Once PO/order has been placed this cannot|Y
01|234471|27|3|be cancelled or returned.|Y
01|234471|31|1|A tariff surcharge of 8% will be added to every order|Y
01|234471|31|2|placed after September 1st 2025(until further notice).|Y
01|234471|31|3|This surcharge will be acknowledged upon acceptance|Y
01|234471|31|4|of every order.|Y
01|234472|3|1|A tariff surcharge may be added to this quotation in|Y
01|234472|3|2|the event of a sustained tariff increase on the|Y
01|234472|3|3|importation of this product.  Any surcharge will be|Y
01|234472|3|4|disclosed prior to acceptance of an order.|Y
01|234473|2|1|A tariff surcharge may be added to this quotation in|Y
01|234473|2|2|the event of a sustained tariff increase on the|Y
01|234473|2|3|importation of this product.  Any surcharge will be|Y
01|234473|2|4|disclosed prior to acceptance of an order.|Y
01|234474|7|1|Machine/modify blank draw screw to adapt to machine|Y
01|234474|12|1|Modify the blank draw screw that comes with the chuck|Y
01|234474|12|2|and we will need to make a coupling adapter that goes|Y
01|234474|12|3|from the blank draw screw to the machine drawtube|Y
01|234474|15|1|Modify the blank draw screw that comes with the chuck|Y
01|234474|15|2|and we will need to make a coupling adapter that goes|Y
01|234474|15|3|from the blank draw screw to the machine drawtube|Y
01|234474|16|1|A tariff surcharge may be added to this quotation in|Y
01|234474|16|2|the event of a sustained tariff increase on the|Y
01|234474|16|3|importation of this product.  Any surcharge will be|Y
01|234474|16|4|disclosed prior to acceptance of an order.|Y
01|234475|5|1|A tariff surcharge may be added to this quotation in|Y
01|234475|5|2|the event of a sustained tariff increase on the|Y
01|234475|5|3|importation of this product.  Any surcharge will be|Y
01|234475|5|4|disclosed prior to acceptance of an order.|Y
01|234476|1|1|Pais de Origen: India|Y
01|234476|2|1|Pais de Origen: India|Y
01|234476|3|1|Pais de Origen: India|Y
01|234476|4|1|A tariff surcharge may be added to this quotation in|Y
01|234476|4|2|the event of a sustained tariff increase on the|Y
01|234476|4|3|importation of this product.  Any surcharge will be|Y
01|234476|4|4|disclosed prior to acceptance of an order.|Y
01|234477|2|1|A tariff surcharge may be added to this quotation in|Y
01|234477|2|2|the event of a sustained tariff increase on the|Y
01|234477|2|3|importation of this product.  Any surcharge will be|Y
01|234477|2|4|disclosed prior to acceptance of an order.|Y
01|234478|2|1|A tariff surcharge may be added to this quotation in|Y
01|234478|2|2|the event of a sustained tariff increase on the|Y
01|234478|2|3|importation of this product.  Any surcharge will be|Y
01|234478|2|4|disclosed prior to acceptance of an order.|Y
01|234479|6|1|A tariff surcharge may be added to this quotation in|Y
01|234479|6|2|the event of a sustained tariff increase on the|Y
01|234479|6|3|importation of this product.  Any surcharge will be|Y
01|234479|6|4|disclosed prior to acceptance of an order.|Y
01|234480|27|1|Please note new part number replacing C40SF-25-100.|Y
01|234480|61|1|A tariff surcharge of 8% will be added to every order|Y
01|234480|61|2|placed after September 1st 2025(until further notice).|Y
01|234480|61|3|This surcharge will be acknowledged upon acceptance|Y
01|234480|61|4|of every order. to acceptance of an order.|Y
01|234481|4|1|A tariff surcharge may be added to this quotation in|Y
01|234481|4|2|the event of a sustained tariff increase on the|Y
01|234481|4|3|importation of this product.  Any surcharge will be|Y
01|234481|4|4|disclosed prior to acceptance of an order.|Y
01|234482|2|1|A tariff surcharge may be added to this quotation in|Y
01|234482|2|2|the event of a sustained tariff increase on the|Y
01|234482|2|3|importation of this product.  Any surcharge will be|Y
01|234482|2|4|disclosed prior to acceptance of an order.|Y
01|234483|2|1|A tariff surcharge may be added to this quotation in|Y
01|234483|2|2|the event of a sustained tariff increase on the|Y
01|234483|2|3|importation of this product.  Any surcharge will be|Y
01|234483|2|4|disclosed prior to acceptance of an order.|Y
01|234484|2|1|A tariff surcharge may be added to this quotation in|Y
01|234484|2|2|the event of a sustained tariff increase on the|Y
01|234484|2|3|importation of this product.  Any surcharge will be|Y
01|234484|2|4|disclosed prior to acceptance of an order.|Y
01|234485|1|1|C5006-42-4.50DIN-M  CAT50 End Mill Holder 42mm 25K DIN|Y
01|234485|1|2|4-Din Holes|Y
01|234485|2|1|Quoted At NET price.|Y
01|234485|3|1|A tariff surcharge may be added to this quotation in|Y
01|234485|3|2|the event of a sustained tariff increase on the|Y
01|234485|3|3|importation of this product.  Any surcharge will be|Y
01|234485|3|4|disclosed prior to acceptance of an order.|Y
01|234486|2|1|A tariff surcharge may be added to this quotation in|Y
01|234486|2|2|the event of a sustained tariff increase on the|Y
01|234486|2|3|importation of this product.  Any surcharge will be|Y
01|234486|2|4|disclosed prior to acceptance of an order.|Y
01|234487|3|1|A tariff surcharge may be added to this quotation in|Y
01|234487|3|2|the event of a sustained tariff increase on the|Y
01|234487|3|3|importation of this product.  Any surcharge will be|Y
01|234487|3|4|disclosed prior to acceptance of an order.|Y
01|234488|9|1|A tariff surcharge may be added to this quotation in|Y
01|234488|9|2|the event of a sustained tariff increase on the|Y
01|234488|9|3|importation of this product.  Any surcharge will be|Y
01|234488|9|4|disclosed prior to acceptance of an order.|Y
01|234489|3|1|A tariff surcharge may be added to this quotation in|Y
01|234489|3|2|the event of a sustained tariff increase on the|Y
01|234489|3|3|importation of this product.  Any surcharge will be|Y
01|234489|3|4|disclosed prior to acceptance of an order.|Y
01|234491|1|1|RGA#TAR-62015|Y
01|234491|1|2|5AX-350FA-RCN-RJ6|Y
01|234491|39|1|TCE-96406|Y
01|234491|39|2|Heidenhain Cable|Y
01|234491|40|1|Re-surfacing two rotary joints|Y
01|234491|-13|1|A tariff surcharge may be added to this quotation in|Y
01|234491|-13|2|the event of a sustained tariff increase on the|Y
01|234491|-13|3|importation of this product.  Any surcharge will be|Y
01|234491|-13|4|disclosed prior to acceptance of an order.|Y
01|234492|3|1|A tariff surcharge may be added to this quotation in|Y
01|234492|3|2|the event of a sustained tariff increase on the|Y
01|234492|3|3|importation of this product.  Any surcharge will be|Y
01|234492|3|4|disclosed prior to acceptance of an order.|Y
01|234493|5|1|A tariff surcharge may be added to this quotation in|Y
01|234493|5|2|the event of a sustained tariff increase on the|Y
01|234493|5|3|importation of this product.  Any surcharge will be|Y
01|234493|5|4|disclosed prior to acceptance of an order.|Y
01|234494|2|1|A tariff surcharge may be added to this quotation in|Y
01|234494|2|2|the event of a sustained tariff increase on the|Y
01|234494|2|3|importation of this product.  Any surcharge will be|Y
01|234494|2|4|disclosed prior to acceptance of an order.|Y
01|234495|1|1|HSK40A-SM1500-60CP|Y
01|234495|1|2|Net price for MMC.|Y
01|234495|2|1|A tariff surcharge may be added to this quotation in|Y
01|234495|2|2|the event of a sustained tariff increase on the|Y
01|234495|2|3|importation of this product.  Any surcharge will be|Y
01|234495|2|4|disclosed prior to acceptance of an order.|Y
01|234496|5|1|A tariff surcharge may be added to this quotation in|Y
01|234496|5|2|the event of a sustained tariff increase on the|Y
01|234496|5|3|importation of this product.  Any surcharge will be|Y
01|234496|5|4|disclosed prior to acceptance of an order.|Y
01|234497|2|1|A tariff surcharge may be added to this quotation in|Y
01|234497|2|2|the event of a sustained tariff increase on the|Y
01|234497|2|3|importation of this product.  Any surcharge will be|Y
01|234497|2|4|disclosed prior to acceptance of an order.|Y
01|234498|3|1|A tariff surcharge may be added to this quotation in|Y
01|234498|3|2|the event of a sustained tariff increase on the|Y
01|234498|3|3|importation of this product.  Any surcharge will be|Y
01|234498|3|4|disclosed prior to acceptance of an order.|Y
01|234500|4|1|A tariff surcharge may be added to this quotation in|Y
01|234500|4|2|the event of a sustained tariff increase on the|Y
01|234500|4|3|importation of this product.  Any surcharge will be|Y
01|234500|4|4|disclosed prior to acceptance of an order.|Y
01|234501|5|1|A tariff surcharge may be added to this quotation in|Y
01|234501|5|2|the event of a sustained tariff increase on the|Y
01|234501|5|3|importation of this product.  Any surcharge will be|Y
01|234501|5|4|disclosed prior to acceptance of an order.|Y
01|234502|2|1|A tariff surcharge may be added to this quotation in|Y
01|234502|2|2|the event of a sustained tariff increase on the|Y
01|234502|2|3|importation of this product.  Any surcharge will be|Y
01|234502|2|4|disclosed prior to acceptance of an order.|Y
01|234503|3|1|A tariff surcharge may be added to this quotation in|Y
01|234503|3|2|the event of a sustained tariff increase on the|Y
01|234503|3|3|importation of this product.  Any surcharge will be|Y
01|234503|3|4|disclosed prior to acceptance of an order.|Y
01|234504|2|1|A tariff surcharge may be added to this quotation in|Y
01|234504|2|2|the event of a sustained tariff increase on the|Y
01|234504|2|3|importation of this product.  Any surcharge will be|Y
01|234504|2|4|disclosed prior to acceptance of an order.|Y
01|234505|3|1|A tariff surcharge may be added to this quotation in|Y
01|234505|3|2|the event of a sustained tariff increase on the|Y
01|234505|3|3|importation of this product.  Any surcharge will be|Y
01|234505|3|4|disclosed prior to acceptance of an order.|Y
01|234506|15|1|A tariff surcharge may be added to this quotation in|Y
01|234506|15|2|the event of a sustained tariff increase on the|Y
01|234506|15|3|importation of this product.  Any surcharge will be|Y
01|234506|15|4|disclosed prior to acceptance of an order.|Y
01|234507|3|1|Estimated lead time is 13~15 weeks after receipt of|Y
01|234507|3|2|an order.|Y
01|234507|7|1|A tariff surcharge may be added to this quotation in|Y
01|234507|7|2|the event of a sustained tariff increase on the|Y
01|234507|7|3|importation of this product.  Any surcharge will be|Y
01|234507|7|4|disclosed prior to acceptance of an order.|Y
01|234508|3|1|A tariff surcharge may be added to this quotation in|Y
01|234508|3|2|the event of a sustained tariff increase on the|Y
01|234508|3|3|importation of this product.  Any surcharge will be|Y
01|234508|3|4|disclosed prior to acceptance of an order.|Y
01|234509|1|1|Delivery:|Y
01|234509|1|2|Estimated 1 pc by 7/20 remaining 1 pc 9/Beginning|Y
01|234509|2|1|A tariff surcharge may be added to this quotation in|Y
01|234509|2|2|the event of a sustained tariff increase on the|Y
01|234509|2|3|importation of this product.  Any surcharge will be|Y
01|234509|2|4|disclosed prior to acceptance of an order.|Y
01|234510|2|1|A tariff surcharge may be added to this quotation in|Y
01|234510|2|2|the event of a sustained tariff increase on the|Y
01|234510|2|3|importation of this product.  Any surcharge will be|Y
01|234510|2|4|disclosed prior to acceptance of an order.|Y
01|234511|6|1|A tariff surcharge may be added to this quotation in|Y
01|234511|6|2|the event of a sustained tariff increase on the|Y
01|234511|6|3|importation of this product.  Any surcharge will be|Y
01|234511|6|4|disclosed prior to acceptance of an order.|Y
01|234512|2|1|A tariff surcharge may be added to this quotation in|Y
01|234512|2|2|the event of a sustained tariff increase on the|Y
01|234512|2|3|importation of this product.  Any surcharge will be|Y
01|234512|2|4|disclosed prior to acceptance of an order.|Y
01|234513|4|1|A tariff surcharge may be added to this quotation in|Y
01|234513|4|2|the event of a sustained tariff increase on the|Y
01|234513|4|3|importation of this product.  Any surcharge will be|Y
01|234513|4|4|disclosed prior to acceptance of an order.|Y
01|234514|2|1|A tariff surcharge may be added to this quotation in|Y
01|234514|2|2|the event of a sustained tariff increase on the|Y
01|234514|2|3|importation of this product.  Any surcharge will be|Y
01|234514|2|4|disclosed prior to acceptance of an order.|Y
01|234516|2|1|A tariff surcharge may be added to this quotation in|Y
01|234516|2|2|the event of a sustained tariff increase on the|Y
01|234516|2|3|importation of this product.  Any surcharge will be|Y
01|234516|2|4|disclosed prior to acceptance of an order.|Y
01|234517|2|1|A tariff surcharge may be added to this quotation in|Y
01|234517|2|2|the event of a sustained tariff increase on the|Y
01|234517|2|3|importation of this product.  Any surcharge will be|Y
01|234517|2|4|disclosed prior to acceptance of an order.|Y
01|234518|2|1|A tariff surcharge may be added to this quotation in|Y
01|234518|2|2|the event of a sustained tariff increase on the|Y
01|234518|2|3|importation of this product.  Any surcharge will be|Y
01|234518|2|4|disclosed prior to acceptance of an order.|Y
01|234519|5|1|A tariff surcharge may be added to this quotation in|Y
01|234519|5|2|the event of a sustained tariff increase on the|Y
01|234519|5|3|importation of this product.  Any surcharge will be|Y
01|234519|5|4|disclosed prior to acceptance of an order.|Y
01|234520|2|1|A tariff surcharge may be added to this quotation in|Y
01|234520|2|2|the event of a sustained tariff increase on the|Y
01|234520|2|3|importation of this product.  Any surcharge will be|Y
01|234520|2|4|disclosed prior to acceptance of an order.|Y
01|234521|3|1|NCS-10.1|Y
01|234521|5|1|NCS-16.1|Y
01|234522|5|1|A tariff surcharge may be added to this quotation in|Y
01|234522|5|2|the event of a sustained tariff increase on the|Y
01|234522|5|3|importation of this product.  Any surcharge will be|Y
01|234522|5|4|disclosed prior to acceptance of an order.|Y
01|234523|1|1|Special Slim Line 90-degree Right Angle Head with|Y
01|234523|1|2|Threaded Spindle Interface for Mimatic Boring Head|Y
01|234523|2|1|Mimatic Special Adjustable Boring Head.|Y
01|234523|2|2|Suitable for ISO insert and fine diameter adjustment.|Y
01|234523|2|3|*Inserts are not supplied as these are triangular|Y
01|234523|2|4|ISO standard.|Y
01|234523|3|1|A tariff surcharge may be added to this quotation in|Y
01|234523|3|2|the event of a sustained tariff increase on the|Y
01|234523|3|3|importation of this product.  Any surcharge will be|Y
01|234523|3|4|disclosed prior to acceptance of an order.|Y
01|234524|2|1|A tariff surcharge may be added to this quotation in|Y
01|234524|2|2|the event of a sustained tariff increase on the|Y
01|234524|2|3|importation of this product.  Any surcharge will be|Y
01|234524|2|4|disclosed prior to acceptance of an order.|Y
01|234525|2|1|A tariff surcharge may be added to this quotation in|Y
01|234525|2|2|the event of a sustained tariff increase on the|Y
01|234525|2|3|importation of this product.  Any surcharge will be|Y
01|234525|2|4|disclosed prior to acceptance of an order.|Y
01|234526|1|1|Placeholder for K32-BCB14.5-80.|Y
01|234526|1|2|Boring bar - line 13865 on Nikken factory stock file.|Y
01|234526|2|1|A tariff surcharge may be added to this quotation in|Y
01|234526|2|2|the event of a sustained tariff increase on the|Y
01|234526|2|3|importation of this product.  Any surcharge will be|Y
01|234526|2|4|disclosed prior to acceptance of an order.|Y
01|234527|3|1|A tariff surcharge may be added to this quotation in|Y
01|234527|3|2|the event of a sustained tariff increase on the|Y
01|234527|3|3|importation of this product.  Any surcharge will be|Y
01|234527|3|4|disclosed prior to acceptance of an order.|Y
01|234528|2|1|Please note additional 20% applied per overstock promo.|Y
01|234528|2|2|These cannot be cancelled or returned upon PO/order.|Y
01|234528|2|3|Once stock is depleted these will need to be requoted.|Y
01|234528|3|1|A tariff surcharge may be added to this quotation in|Y
01|234528|3|2|the event of a sustained tariff increase on the|Y
01|234528|3|3|importation of this product.  Any surcharge will be|Y
01|234528|3|4|disclosed prior to acceptance of an order.|Y
01|234529|3|1|A tariff surcharge may be added to this quotation in|Y
01|234529|3|2|the event of a sustained tariff increase on the|Y
01|234529|3|3|importation of this product.  Any surcharge will be|Y
01|234529|3|4|disclosed prior to acceptance of an order.|Y
01|234530|2|1|A tariff surcharge may be added to this quotation in|Y
01|234530|2|2|the event of a sustained tariff increase on the|Y
01|234530|2|3|importation of this product.  Any surcharge will be|Y
01|234530|2|4|disclosed prior to acceptance of an order.|Y
01|234531|4|1|A tariff surcharge may be added to this quotation in|Y
01|234531|4|2|the event of a sustained tariff increase on the|Y
01|234531|4|3|importation of this product.  Any surcharge will be|Y
01|234531|4|4|disclosed prior to acceptance of an order.|Y
01|234532|2|1|A tariff surcharge may be added to this quotation in|Y
01|234532|2|2|the event of a sustained tariff increase on the|Y
01|234532|2|3|importation of this product.  Any surcharge will be|Y
01|234532|2|4|disclosed prior to acceptance of an order.|Y
01|234533|2|1|A tariff surcharge may be added to this quotation in|Y
01|234533|2|2|the event of a sustained tariff increase on the|Y
01|234533|2|3|importation of this product.  Any surcharge will be|Y
01|234533|2|4|disclosed prior to acceptance of an order.|Y
01|234534|5|1|A tariff surcharge may be added to this quotation in|Y
01|234534|5|2|the event of a sustained tariff increase on the|Y
01|234534|5|3|importation of this product.  Any surcharge will be|Y
01|234534|5|4|disclosed prior to acceptance of an order.|Y
01|234535|1|1|Placeholder for C4007-0032-3.13DIN-M...|Y
01|234535|1|2|These are non-standard stock items and considered|Y
01|234535|1|3|specials. Once a PO has been issued these items|Y
01|234535|1|4|cannot be cancelled or returned.|Y
01|234535|3|1|Placeholder for C4007-0032-5.00DIN-M...|Y
01|234535|3|2|These are non-standard stock items and considered|Y
01|234535|3|3|specials. Once a PO has been issued these items|Y
01|234535|3|4|cannot be cancelled or returned.|Y
01|234535|7|1|A tariff surcharge may be added to this quotation in|Y
01|234535|7|2|the event of a sustained tariff increase on the|Y
01|234535|7|3|importation of this product.  Any surcharge will be|Y
01|234535|7|4|disclosed prior to acceptance of an order.|Y
01|234536|2|1|A tariff surcharge may be added to this quotation in|Y
01|234536|2|2|the event of a sustained tariff increase on the|Y
01|234536|2|3|importation of this product.  Any surcharge will be|Y
01|234536|2|4|disclosed prior to acceptance of an order.|Y
01|234537|2|1|A tariff surcharge may be added to this quotation in|Y
01|234537|2|2|the event of a sustained tariff increase on the|Y
01|234537|2|3|importation of this product.  Any surcharge will be|Y
01|234537|2|4|disclosed prior to acceptance of an order.|Y
01|234538|3|1|**special - cannot be cancelled or returned**|Y
01|234538|13|1|**Special - cannot be cancelled or returned**|Y
01|234538|19|1|A tariff surcharge may be added to this quotation in|Y
01|234538|19|2|the event of a sustained tariff increase on the|Y
01|234538|19|3|importation of this product.  Any surcharge will be|Y
01|234538|19|4|disclosed prior to acceptance of an order.|Y
01|234539|3|1|A tariff surcharge may be added to this quotation in|Y
01|234539|3|2|the event of a sustained tariff increase on the|Y
01|234539|3|3|importation of this product.  Any surcharge will be|Y
01|234539|3|4|disclosed prior to acceptance of an order.|Y
01|234540|3|1|CAT50-SK6F-105U-IDU-M|Y
01|234540|4|1|A tariff surcharge may be added to this quotation in|Y
01|234540|4|2|the event of a sustained tariff increase on the|Y
01|234540|4|3|importation of this product.  Any surcharge will be|Y
01|234540|4|4|disclosed prior to acceptance of an order.|Y
01|234541|3|1|A tariff surcharge may be added to this quotation in|Y
01|234541|3|2|the event of a sustained tariff increase on the|Y
01|234541|3|3|importation of this product.  Any surcharge will be|Y
01|234541|3|4|disclosed prior to acceptance of an order.|Y
01|234542|3|1|A tariff surcharge may be added to this quotation in|Y
01|234542|3|2|the event of a sustained tariff increase on the|Y
01|234542|3|3|importation of this product.  Any surcharge will be|Y
01|234542|3|4|disclosed prior to acceptance of an order.|Y
01|234543|2|1|A tariff surcharge may be added to this quotation in|Y
01|234543|2|2|the event of a sustained tariff increase on the|Y
01|234543|2|3|importation of this product.  Any surcharge will be|Y
01|234543|2|4|disclosed prior to acceptance of an order.|Y
01|234544|3|1|A tariff surcharge may be added to this quotation in|Y
01|234544|3|2|the event of a sustained tariff increase on the|Y
01|234544|3|3|importation of this product.  Any surcharge will be|Y
01|234544|3|4|disclosed prior to acceptance of an order.|Y
01|234545|2|1|A tariff surcharge may be added to this quotation in|Y
01|234545|2|2|the event of a sustained tariff increase on the|Y
01|234545|2|3|importation of this product.  Any surcharge will be|Y
01|234545|2|4|disclosed prior to acceptance of an order.|Y
01|234546|6|1|Estimated lead time is end of early/mid August.|Y
01|234546|51|1|A tariff surcharge may be added to this quotation in|Y
01|234546|51|2|the event of a sustained tariff increase on the|Y
01|234546|51|3|importation of this product.  Any surcharge will be|Y
01|234546|51|4|disclosed prior to the acceptance of an order.|Y
01|234547|2|1|A tariff surcharge may be added to this quotation in|Y
01|234547|2|2|the event of a sustained tariff increase on the|Y
01|234547|2|3|importation of this product.  Any surcharge will be|Y
01|234547|2|4|disclosed prior to acceptance of an order.|Y
01|234548|1|1|1st Batch 6/20KC:DWG saved in Teams File FW'd to Tim|Y
01|234548|2|1|1st Batch 6/10KC:DWG saved in Teams File|Y
01|234548|3|1|A tariff surcharge may be added to this quotation in|Y
01|234548|3|2|the event of a sustained tariff increase on the|Y
01|234548|3|3|importation of this product.  Any surcharge will be|Y
01|234548|3|4|disclosed prior to acceptance of an order.|Y
01|234549|2|1|A tariff surcharge may be added to this quotation in|Y
01|234549|2|2|the event of a sustained tariff increase on the|Y
01|234549|2|3|importation of this product.  Any surcharge will be|Y
01|234549|2|4|disclosed prior to acceptance of an order.|Y
01|234550|3|1|Delivery: 1 Week after the receipt of necessary spindle|Y
01|234550|3|2|specs|Y
01|234550|3|3|**NET Price**  **Cannot be cancelled or returned**|Y
01|234550|20|1|A tariff surcharge may be added to this quotation in|Y
01|234550|20|2|the event of a sustained tariff increase on the|Y
01|234550|20|3|importation of this product.  Any surcharge will be|Y
01|234550|20|4|disclosed prior to acceptance of an order.|Y
01|234551|2|1|A tariff surcharge may be added to this quotation in|Y
01|234551|2|2|the event of a sustained tariff increase on the|Y
01|234551|2|3|importation of this product.  Any surcharge will be|Y
01|234551|2|4|disclosed prior to acceptance of an order.|Y
01|234552|2|1|A tariff surcharge may be added to this quotation in|Y
01|234552|2|2|the event of a sustained tariff increase on the|Y
01|234552|2|3|importation of this product.  Any surcharge will be|Y
01|234552|2|4|disclosed prior to acceptance of an order.|Y
01|234553|1|1|Mazak VDI40 Live 1/2 Shell Mill Holder. Shank VDI40|Y
01|234553|1|2|similar DIN ISO10889(DIN 69880).Two tang drive SW=10h8|Y
01|234553|1|3|tooling interface for face mill arbor diameter 1/2|Y
01|234553|1|4|ext coolant over coolant pipeno reversal of rotation|Y
01|234553|1|5|directionL1=app.115mmgear ratio:i(n1/n2)=1:1max|Y
01|234553|1|6|coolant pressure p(max)=70barmax torque M(max)=80Nm|Y
01|234553|1|7|max revolution n1(max)=8500RPM N2(max)=8500RPM.|Y
01|234553|5|1|Customer will need a spindle wrench pin style and|Y
01|234553|5|2|will be determined after final drawing is supplied.|Y
01|234553|5|3|Pricing will be provided at that time.|Y
01|234553|18|1|A tariff surcharge may be added to this quotation in|Y
01|234553|18|2|the event of a sustained tariff increase on the|Y
01|234553|18|3|importation of this product.  Any surcharge will be|Y
01|234553|18|4|disclosed prior to acceptance of an order.|Y
01|234554|24|1|A tariff surcharge may be added to this quotation in|Y
01|234554|24|2|the event of a sustained tariff increase on the|Y
01|234554|24|3|importation of this product.  Any surcharge will be|Y
01|234554|24|4|disclosed prior to acceptance of an order.|Y
01|234555|1|1|**special non-standard stock. Cannot be cancelled|Y
01|234555|1|2|or returned upon receipt of PO|Y
01|234555|2|1|A tariff surcharge may be added to this quotation in|Y
01|234555|2|2|the event of a sustained tariff increase on the|Y
01|234555|2|3|importation of this product.  Any surcharge will be|Y
01|234555|2|4|disclosed prior to acceptance of an order.|Y
01|234557|24|1|A tariff surcharge may be added to this quotation in|Y
01|234557|24|2|the event of a sustained tariff increase on the|Y
01|234557|24|3|importation of this product.  Any surcharge will be|Y
01|234557|24|4|disclosed prior to acceptance of an order.|Y
01|234558|10|1|A tariff surcharge may be added to this quotation in|Y
01|234558|10|2|the event of a sustained tariff increase on the|Y
01|234558|10|3|importation of this product.  Any surcharge will be|Y
01|234558|10|4|disclosed prior to acceptance of an order|Y
01|234559|3|1|A tariff surcharge may be added to this quotation in|Y
01|234559|3|2|the event of a sustained tariff increase on the|Y
01|234559|3|3|importation of this product.  Any surcharge will be|Y
01|234559|3|4|disclosed prior to acceptance of an order.|Y
01|234560|3|1|LYNDEX NIKKEN TECHNICIAN TRAVEL & LABOR EXPENSES PLUS|Y
01|234560|3|2|ANY ADDITIONAL REQUIRED HARDWARE FOR INSTALLATION|Y
01|234560|4|1|A tariff surcharge may be added to this quotation in|Y
01|234560|4|2|the event of a sustained tariff increase on the|Y
01|234560|4|3|importation of this product.  Any surcharge will be|Y
01|234560|4|4|disclosed prior to acceptance of an order.|Y
01|234561|1|1|Tariff Code: 8466.10.0175 / Country of Origin Japan|Y
01|234561|3|1|A tariff surcharge may be added to this quotation in|Y
01|234561|3|2|the event of a sustained tariff increase on the|Y
01|234561|3|3|importation of this product.  Any surcharge will be|Y
01|234561|3|4|disclosed prior to acceptance of an order.|Y
01|234562|2|1|A tariff surcharge may be added to this quotation in|Y
01|234562|2|2|the event of a sustained tariff increase on the|Y
01|234562|2|3|importation of this product.  Any surcharge will be|Y
01|234562|2|4|disclosed prior to acceptance of an order.|Y
01|234563|1|1|RGA#TAR-62017|Y
01|234563|1|2|5AX-130SA-BR2 SN: 5877|Y
01|234563|49|1|A tariff surcharge may be added to this quotation in|Y
01|234563|49|2|the event of a sustained tariff increase on the|Y
01|234563|49|3|importation of this product.  Any surcharge will be|Y
01|234563|49|4|disclosed prior to acceptance of an order.|Y
01|234564|2|1|A tariff surcharge may be added to this quotation in|Y
01|234564|2|2|the event of a sustained tariff increase on the|Y
01|234564|2|3|importation of this product.  Any surcharge will be|Y
01|234564|2|4|disclosed prior to acceptance of an order.|Y
01|234565|15|1|A tariff surcharge may be added to this quotation in|Y
01|234565|15|2|the event of a sustained tariff increase on the|Y
01|234565|15|3|importation of this product.  Any surcharge will be|Y
01|234565|15|4|disclosed prior to acceptance of an order.|Y
01|234566|2|1|A tariff surcharge may be added to this quotation in|Y
01|234566|2|2|the event of a sustained tariff increase on the|Y
01|234566|2|3|importation of this product.  Any surcharge will be|Y
01|234566|2|4|disclosed prior to acceptance of an order.|Y
01|234567|1|1|Final Part# C5006-40-4.50DIN-M|Y
01|234567|1|2|CAT50 End Mill Holder 40mm 25K w/ 2-Hole DIN|Y
01|234567|1|3|**NET Price includes price of holder + DIN Hole Mod Fee|Y
01|234567|1|4|**Custom Tool - Cannot be cancelled or returned|Y
01|234567|4|1|A tariff surcharge may be added to this quotation in|Y
01|234567|4|2|the event of a sustained tariff increase on the|Y
01|234567|4|3|importation of this product.  Any surcharge will be|Y
01|234567|4|4|disclosed prior to acceptance of an order.|Y
01|234568|5|1|A tariff surcharge may be added to this quotation in|Y
01|234568|5|2|the event of a sustained tariff increase on the|Y
01|234568|5|3|importation of this product.  Any surcharge will be|Y
01|234568|5|4|disclosed prior to acceptance of an order.|Y
01|234569|3|1|A tariff surcharge may be added to this quotation in|Y
01|234569|3|2|the event of a sustained tariff increase on the|Y
01|234569|3|3|importation of this product.  Any surcharge will be|Y
01|234569|3|4|disclosed prior to acceptance of an order.|Y
01|234570|2|1|A tariff surcharge may be added to this quotation in|Y
01|234570|2|2|the event of a sustained tariff increase on the|Y
01|234570|2|3|importation of this product.  Any surcharge will be|Y
01|234570|2|4|disclosed prior to acceptance of an order.|Y
01|234571|2|1|A tariff surcharge may be added to this quotation in|Y
01|234571|2|2|the event of a sustained tariff increase on the|Y
01|234571|2|3|importation of this product.  Any surcharge will be|Y
01|234571|2|4|disclosed prior to acceptance of an order.|Y
01|234572|3|1|A tariff surcharge may be added to this quotation in|Y
01|234572|3|2|the event of a sustained tariff increase on the|Y
01|234572|3|3|importation of this product.  Any surcharge will be|Y
01|234572|3|4|disclosed prior to acceptance of an order.|Y
01|234573|2|1|A tariff surcharge may be added to this quotation in|Y
01|234573|2|2|the event of a sustained tariff increase on the|Y
01|234573|2|3|importation of this product.  Any surcharge will be|Y
01|234573|2|4|disclosed prior to acceptance of an order.|Y
01|234574|16|1|A tariff surcharge may be added to this quotation in|Y
01|234574|16|2|the event of a sustained tariff increase on the|Y
01|234574|16|3|importation of this product.  Any surcharge will be|Y
01|234574|16|4|disclosed prior to acceptance of an order.|Y
01|234575|2|1|A tariff surcharge may be added to this quotation in|Y
01|234575|2|2|the event of a sustained tariff increase on the|Y
01|234575|2|3|importation of this product.  Any surcharge will be|Y
01|234575|2|4|disclosed prior to acceptance of an order.|Y
01|234576|2|1|A tariff surcharge may be added to this quotation in|Y
01|234576|2|2|the event of a sustained tariff increase on the|Y
01|234576|2|3|importation of this product.  Any surcharge will be|Y
01|234576|2|4|disclosed prior to acceptance of an order.|Y
01|234577|2|1|A tariff surcharge may be added to this quotation in|Y
01|234577|2|2|the event of a sustained tariff increase on the|Y
01|234577|2|3|importation of this product.  Any surcharge will be|Y
01|234577|2|4|disclosed prior to acceptance of an order.|Y
01|234578|1|1|Service call for E46LA s/n:200178|Y
01|234578|1|2|This is a time based estimate.|Y
01|234578|1|3|Any parts that would be required would be additional.|Y
01|234578|3|1|A tariff surcharge may be added to this quotation in|Y
01|234578|3|2|the event of a sustained tariff increase on the|Y
01|234578|3|3|importation of this product.  Any surcharge will be|Y
01|234578|3|4|disclosed prior to acceptance of an order.|Y
01|234579|3|1|A tariff surcharge may be added to this quotation in|Y
01|234579|3|2|the event of a sustained tariff increase on the|Y
01|234579|3|3|importation of this product.  Any surcharge will be|Y
01|234579|3|4|disclosed prior to acceptance of an order.|Y
01|234580|1|1|Pais de Origen: Taiwan|Y
01|234580|2|1|A tariff surcharge may be added to this quotation in|Y
01|234580|2|2|the event of a sustained tariff increase on the|Y
01|234580|2|3|importation of this product.  Any surcharge will be|Y
01|234580|2|4|disclosed prior to acceptance of an order.|Y
01|234581|2|1|A tariff surcharge may be added to this quotation in|Y
01|234581|2|2|the event of a sustained tariff increase on the|Y
01|234581|2|3|importation of this product.  Any surcharge will be|Y
01|234581|2|4|disclosed prior to acceptance of an order.|Y
01|234582|2|1|A tariff surcharge may be added to this quotation in|Y
01|234582|2|2|the event of a sustained tariff increase on the|Y
01|234582|2|3|importation of this product.  Any surcharge will be|Y
01|234582|2|4|disclosed prior to acceptance of an order.|Y
01|234583|1|1|Pais de Origen: Japon|Y
01|234583|2|1|Pais de Origen: Japon|Y
01|234583|3|1|A tariff surcharge may be added to this quotation in|Y
01|234583|3|2|the event of a sustained tariff increase on the|Y
01|234583|3|3|importation of this product.  Any surcharge will be|Y
01|234583|3|4|disclosed prior to acceptance of an order.|Y
01|234584|2|1|A tariff surcharge may be added to this quotation in|Y
01|234584|2|2|the event of a sustained tariff increase on the|Y
01|234584|2|3|importation of this product.  Any surcharge will be|Y
01|234584|2|4|disclosed prior to acceptance of an order.|Y
01|234585|2|1|A tariff surcharge may be added to this quotation in|Y
01|234585|2|2|the event of a sustained tariff increase on the|Y
01|234585|2|3|importation of this product.  Any surcharge will be|Y
01|234585|2|4|disclosed prior to acceptance of an order.|Y
01|234586|3|1|A tariff surcharge may be added to this quotation in|Y
01|234586|3|2|the event of a sustained tariff increase on the|Y
01|234586|3|3|importation of this product.  Any surcharge will be|Y
01|234586|3|4|disclosed prior to acceptance of an order.|Y
01|234587|8|1|A tariff surcharge may be added to this quotation in|Y
01|234587|8|2|the event of a sustained tariff increase on the|Y
01|234587|8|3|importation of this product.  Any surcharge will be|Y
01|234587|8|4|disclosed prior to acceptance of an order.|Y
01|234588|2|1|A tariff surcharge may be added to this quotation in|Y
01|234588|2|2|the event of a sustained tariff increase on the|Y
01|234588|2|3|importation of this product.  Any surcharge will be|Y
01|234588|2|4|disclosed prior to acceptance of an order.|Y
01|234589|8|1|A tariff surcharge may be added to this quotation in|Y
01|234589|8|2|the event of a sustained tariff increase on the|Y
01|234589|8|3|importation of this product.  Any surcharge will be|Y
01|234589|8|4|disclosed prior to acceptance of an order.|Y
01|234590|4|1|A tariff surcharge may be added to this quotation in|Y
01|234590|4|2|the event of a sustained tariff increase on the|Y
01|234590|4|3|importation of this product.  Any surcharge will be|Y
01|234590|4|4|disclosed prior to acceptance of an order.|Y
01|234591|2|1|A tariff surcharge may be added to this quotation in|Y
01|234591|2|2|the event of a sustained tariff increase on the|Y
01|234591|2|3|importation of this product.  Any surcharge will be|Y
01|234591|2|4|disclosed prior to acceptance of an order.|Y
01|234592|2|1|A tariff surcharge may be added to this quotation in|Y
01|234592|2|2|the event of a sustained tariff increase on the|Y
01|234592|2|3|importation of this product.  Any surcharge will be|Y
01|234592|2|4|disclosed prior to acceptance of an order.|Y
01|234593|2|1|A tariff surcharge may be added to this quotation in|Y
01|234593|2|2|the event of a sustained tariff increase on the|Y
01|234593|2|3|importation of this product.  Any surcharge will be|Y
01|234593|2|4|disclosed prior to acceptance of an order.|Y
01|234594|2|1|A tariff surcharge may be added to this quotation in|Y
01|234594|2|2|the event of a sustained tariff increase on the|Y
01|234594|2|3|importation of this product.  Any surcharge will be|Y
01|234594|2|4|disclosed prior to acceptance of an order.|Y
01|234595|1|1|Estimated lead time is beginning/mid October if|Y
01|234595|1|2|ordered before the end of July.|Y
01|234595|8|1|A tariff surcharge may be added to this quotation in|Y
01|234595|8|2|the event of a sustained tariff increase on the|Y
01|234595|8|3|importation of this product.  Any surcharge will be|Y
01|234595|8|4|disclosed prior to acceptance of an order.|Y
01|234596|3|1|A tariff surcharge may be added to this quotation in|Y
01|234596|3|2|the event of a sustained tariff increase on the|Y
01|234596|3|3|importation of this product.  Any surcharge will be|Y
01|234596|3|4|disclosed prior to acceptance of an order.|Y
01|234597|1|1|No inspection required.|Y
01|234597|2|1|No inspection required.|Y
01|234597|3|1|No inspection required.|Y
01|234598|2|1|A tariff surcharge may be added to this quotation in|Y
01|234598|2|2|the event of a sustained tariff increase on the|Y
01|234598|2|3|importation of this product.  Any surcharge will be|Y
01|234598|2|4|disclosed prior to acceptance of an order.|Y
01|234599|2|1|A tariff surcharge may be added to this quotation in|Y
01|234599|2|2|the event of a sustained tariff increase on the|Y
01|234599|2|3|importation of this product.  Any surcharge will be|Y
01|234599|2|4|disclosed prior to acceptance of an order.|Y
01|234600|7|1|A tariff surcharge may be added to this quotation in|Y
01|234600|7|2|the event of a sustained tariff increase on the|Y
01|234600|7|3|importation of this product.  Any surcharge will be|Y
01|234600|7|4|disclosed prior to acceptance of an order.|Y
01|234601|7|1|A tariff surcharge may be added to this quotation in|Y
01|234601|7|2|the event of a sustained tariff increase on the|Y
01|234601|7|3|importation of this product.  Any surcharge will be|Y
01|234601|7|4|disclosed prior to acceptance of an order.|Y
01|234602|3|1|A tariff surcharge may be added to this quotation in|Y
01|234602|3|2|the event of a sustained tariff increase on the|Y
01|234602|3|3|importation of this product.  Any surcharge will be|Y
01|234602|3|4|disclosed prior to acceptance of an order.|Y
01|234603|3|1|A tariff surcharge may be added to this quotation in|Y
01|234603|3|2|the event of a sustained tariff increase on the|Y
01|234603|3|3|importation of this product.  Any surcharge will be|Y
01|234603|3|4|disclosed prior to acceptance of an order.|Y
01|234604|2|1|A tariff surcharge may be added to this quotation in|Y
01|234604|2|2|the event of a sustained tariff increase on the|Y
01|234604|2|3|importation of this product.  Any surcharge will be|Y
01|234604|2|4|disclosed prior to acceptance of an order.|Y
01|234605|17|1|A tariff surcharge may be added to this quotation in|Y
01|234605|17|2|the event of a sustained tariff increase on the|Y
01|234605|17|3|importation of this product.  Any surcharge will be|Y
01|234605|17|4|disclosed prior to acceptance of an order.|Y
01|234606|2|1|A tariff surcharge may be added to this quotation in|Y
01|234606|2|2|the event of a sustained tariff increase on the|Y
01|234606|2|3|importation of this product.  Any surcharge will be|Y
01|234606|2|4|disclosed prior to acceptance of an order.|Y
01|234607|9|1|A tariff surcharge may be added to this quotation in|Y
01|234607|9|2|the event of a sustained tariff increase on the|Y
01|234607|9|3|importation of this product.  Any surcharge will be|Y
01|234607|9|4|disclosed prior to acceptance of an order.|Y
01|234608|16|1|A tariff surcharge may be added to this quotation in|Y
01|234608|16|2|the event of a sustained tariff increase on the|Y
01|234608|16|3|importation of this product.  Any surcharge will be|Y
01|234608|16|4|disclosed prior to acceptance of an order.|Y
01|234609|1|1|RGA#TAR-62042|Y
01|234609|1|2|5AX-201FA-M SN: 4286|Y
01|234609|48|1|Parts Grinding Fee|Y
01|234609|49|1|A tariff surcharge may be added to this quotation in|Y
01|234609|49|2|the event of a sustained tariff increase on the|Y
01|234609|49|3|importation of this product.  Any surcharge will be|Y
01|234609|49|4|disclosed prior to acceptance of an order.|Y
01|234610|2|1|A tariff surcharge may be added to this quotation in|Y
01|234610|2|2|the event of a sustained tariff increase on the|Y
01|234610|2|3|importation of this product.  Any surcharge will be|Y
01|234610|2|4|disclosed prior to acceptance of an order.|Y
01|234611|2|1|A tariff surcharge may be added to this quotation in|Y
01|234611|2|2|the event of a sustained tariff increase on the|Y
01|234611|2|3|importation of this product.  Any surcharge will be|Y
01|234611|2|4|disclosed prior to acceptance of an order.|Y
01|234612|2|1|A tariff surcharge may be added to this quotation in|Y
01|234612|2|2|the event of a sustained tariff increase on the|Y
01|234612|2|3|importation of this product.  Any surcharge will be|Y
01|234612|2|4|disclosed prior to acceptance of an order.|Y
01|234613|7|1|mcmaster #91290A632; $11.04/10 pack; buy 2|N
01|234613|7|2|M12 x 65L Socket Head Cap Screw|Y
01|234613|8|1|Location Bushing #17971|Y
01|234613|8|2|Alternate drill bushing -McMaster #8486A94|N
01|234613|9|1|A tariff surcharge may be added to this quotation in|Y
01|234613|9|2|the event of a sustained tariff increase on the|Y
01|234613|9|3|importation of this product.  Any surcharge will be|Y
01|234613|9|4|disclosed prior to acceptance of an order.|Y
01|234614|2|1|A tariff surcharge may be added to this quotation in|Y
01|234614|2|2|the event of a sustained tariff increase on the|Y
01|234614|2|3|importation of this product.  Any surcharge will be|Y
01|234614|2|4|disclosed prior to acceptance of an order.|Y
01|234615|2|1|A tariff surcharge may be added to this quotation in|Y
01|234615|2|2|the event of a sustained tariff increase on the|Y
01|234615|2|3|importation of this product.  Any surcharge will be|Y
01|234615|2|4|disclosed prior to acceptance of an order.|Y
01|234616|2|1|A tariff surcharge may be added to this quotation in|Y
01|234616|2|2|the event of a sustained tariff increase on the|Y
01|234616|2|3|importation of this product.  Any surcharge will be|Y
01|234616|2|4|disclosed prior to acceptance of an order.|Y
01|234617|2|1|A tariff surcharge may be added to this quotation in|Y
01|234617|2|2|the event of a sustained tariff increase on the|Y
01|234617|2|3|importation of this product.  Any surcharge will be|Y
01|234617|2|4|disclosed prior to acceptance of an order.|Y
01|234618|4|1|A tariff surcharge may be added to this quotation in|Y
01|234618|4|2|the event of a sustained tariff increase on the|Y
01|234618|4|3|importation of this product.  Any surcharge will be|Y
01|234618|4|4|disclosed prior to acceptance of an order.|Y
01|234620|1|1|ref. mfg# 192511|Y
01|234620|4|1|A tariff surcharge may be added to this quotation in|Y
01|234620|4|2|the event of a sustained tariff increase on the|Y
01|234620|4|3|importation of this product.  Any surcharge will be|Y
01|234620|4|4|disclosed prior to acceptance of an order.|Y
01|234621|2|1|A tariff surcharge may be added to this quotation in|Y
01|234621|2|2|the event of a sustained tariff increase on the|Y
01|234621|2|3|importation of this product.  Any surcharge will be|Y
01|234621|2|4|disclosed prior to acceptance of an order.|Y
01|234622|2|1|A tariff surcharge may be added to this quotation in|Y
01|234622|2|2|the event of a sustained tariff increase on the|Y
01|234622|2|3|importation of this product.  Any surcharge will be|Y
01|234622|2|4|disclosed prior to acceptance of an order.|Y
01|234623|7|1|A tariff surcharge may be added to this quotation in|Y
01|234623|7|2|the event of a sustained tariff increase on the|Y
01|234623|7|3|importation of this product.  Any surcharge will be|Y
01|234623|7|4|disclosed prior to acceptance of an order.|Y
01|234624|2|1|A tariff surcharge may be added to this quotation in|Y
01|234624|2|2|the event of a sustained tariff increase on the|Y
01|234624|2|3|importation of this product.  Any surcharge will be|Y
01|234624|2|4|disclosed prior to acceptance of an order.|Y
01|234625|1|1|ZeroClamp SP Clamping Base for Variaxis i800 Mazak|Y
01|234625|1|2|Base size 500mm x 500mm Pod ZP 120 x 8pcs.|Y
01|234625|1|3|SP Order Item. NET Price Each. Cancellations cannot be|Y
01|234625|1|4|accepted once the order has been received.|Y
01|234625|11|1|A tariff surcharge may be added to this quotation in|Y
01|234625|11|2|the event of a sustained tariff increase on the|Y
01|234625|11|3|importation of this product.  Any surcharge will be|Y
01|234625|11|4|disclosed prior to acceptance of an order.|Y
01|234626|10|1|A tariff surcharge may be added to this quotation in|Y
01|234626|10|2|the event of a sustained tariff increase on the|Y
01|234626|10|3|importation of this product.  Any surcharge will be|Y
01|234626|10|4|disclosed prior to acceptance of an order.|Y
01|234627|2|1|A tariff surcharge may be added to this quotation in|Y
01|234627|2|2|the event of a sustained tariff increase on the|Y
01|234627|2|3|importation of this product.  Any surcharge will be|Y
01|234627|2|4|disclosed prior to acceptance of an order.|Y
01|234628|9|1|A tariff surcharge may be added to this quotation in|Y
01|234628|9|2|the event of a sustained tariff increase on the|Y
01|234628|9|3|importation of this product.  Any surcharge will be|Y
01|234628|9|4|disclosed prior to acceptance of an order.|Y
01|234629|2|1|A tariff surcharge may be added to this quotation in|Y
01|234629|2|2|the event of a sustained tariff increase on the|Y
01|234629|2|3|importation of this product.  Any surcharge will be|Y
01|234629|2|4|disclosed prior to acceptance of an order.|Y
01|234630|3|1|A tariff surcharge may be added to this quotation in|Y
01|234630|3|2|the event of a sustained tariff increase on the|Y
01|234630|3|3|importation of this product.  Any surcharge will be|Y
01|234630|3|4|disclosed prior to acceptance of an order.|Y
01|234631|2|1|A tariff surcharge may be added to this quotation in|Y
01|234631|2|2|the event of a sustained tariff increase on the|Y
01|234631|2|3|importation of this product.  Any surcharge will be|Y
01|234631|2|4|disclosed prior to acceptance of an order.|Y
01|234632|2|1|A tariff surcharge may be added to this quotation in|Y
01|234632|2|2|the event of a sustained tariff increase on the|Y
01|234632|2|3|importation of this product.  Any surcharge will be|Y
01|234632|2|4|disclosed prior to acceptance of an order.|Y
01|234633|2|1|A tariff surcharge may be added to this quotation in|Y
01|234633|2|2|the event of a sustained tariff increase on the|Y
01|234633|2|3|importation of this product.  Any surcharge will be|Y
01|234633|2|4|disclosed prior to acceptance of an order.|Y
01|234634|2|1|A tariff surcharge may be added to this quotation in|Y
01|234634|2|2|the event of a sustained tariff increase on the|Y
01|234634|2|3|importation of this product.  Any surcharge will be|Y
01|234634|2|4|disclosed prior to acceptance of an order.|Y
01|234635|2|1|Discount reflects a purchase order of 10~14 tools.|Y
01|234635|3|1|Discount reflects a purchase order of 15+ tools.|Y
01|234635|8|1|Quoted at NET price each.|Y
01|234635|9|1|A tariff surcharge may be added to this quotation in|Y
01|234635|9|2|the event of a sustained tariff increase on the|Y
01|234635|9|3|importation of this product.  Any surcharge will be|Y
01|234635|9|4|disclosed prior to acceptance of an order.|Y
01|234636|2|1|A tariff surcharge may be added to this quotation in|Y
01|234636|2|2|the event of a sustained tariff increase on the|Y
01|234636|2|3|importation of this product.  Any surcharge will be|Y
01|234636|2|4|disclosed prior to acceptance of an order.|Y
01|234637|2|1|A tariff surcharge may be added to this quotation in|Y
01|234637|2|2|the event of a sustained tariff increase on the|Y
01|234637|2|3|importation of this product.  Any surcharge will be|Y
01|234637|2|4|disclosed prior to acceptance of an order.|Y
01|234638|6|1|A tariff surcharge may be added to this quotation in|Y
01|234638|6|2|the event of a sustained tariff increase on the|Y
01|234638|6|3|importation of this product.  Any surcharge will be|Y
01|234638|6|4|disclosed prior to acceptance of an order.|Y
01|234639|16|1|A tariff surcharge may be added to this quotation in|Y
01|234639|16|2|the event of a sustained tariff increase on the|Y
01|234639|16|3|importation of this product.  Any surcharge will be|Y
01|234639|16|4|disclosed prior to acceptance of an order.|Y
01|234640|2|1|A tariff surcharge may be added to this quotation in|Y
01|234640|2|2|the event of a sustained tariff increase on the|Y
01|234640|2|3|importation of this product.  Any surcharge will be|Y
01|234640|2|4|disclosed prior to acceptance of an order.|Y
01|234641|2|1|Please note additional 20% applied per overstock promo.|Y
01|234641|2|2|Once PO/order is issued these can't be cancelled or|Y
01|234641|2|3|returned. This will need to be requoted upon stock|Y
01|234641|2|4|depletion.|Y
01|234641|4|1|3 currently left on the shelf.|Y
01|234641|5|1|A tariff surcharge may be added to this quotation in|Y
01|234641|5|2|the event of a sustained tariff increase on the|Y
01|234641|5|3|importation of this product.  Any surcharge will be|Y
01|234641|5|4|disclosed prior to acceptance of an order.|Y
01|234642|9|1|A tariff surcharge may be added to this quotation in|Y
01|234642|9|2|the event of a sustained tariff increase on the|Y
01|234642|9|3|importation of this product.  Any surcharge will be|Y
01|234642|9|4|disclosed prior to acceptance of an order.|Y
01|234643|9|1|TQW-HANDLE14X18 & TQW-E25-G wrenches for ER25 holders.|Y
01|234643|14|1|TQW-HANDLE14X18 & TQW-E32-G wrenches for ER32 holders.|Y
01|234643|46|1|A tariff surcharge may be added to this quotation in|Y
01|234643|46|2|the event of a sustained tariff increase on the|Y
01|234643|46|3|importation of this product.  Any surcharge will be|Y
01|234643|46|4|disclosed prior to acceptance of an order.|Y
01|234644|2|1|A tariff surcharge may be added to this quotation in|Y
01|234644|2|2|the event of a sustained tariff increase on the|Y
01|234644|2|3|importation of this product.  Any surcharge will be|Y
01|234644|2|4|disclosed prior to acceptance of an order.|Y
01|234645|3|1|A tariff surcharge may be added to this quotation in|Y
01|234645|3|2|the event of a sustained tariff increase on the|Y
01|234645|3|3|importation of this product.  Any surcharge will be|Y
01|234645|3|4|disclosed prior to acceptance of an order.|Y
01|234646|2|1|A tariff surcharge may be added to this quotation in|Y
01|234646|2|2|the event of a sustained tariff increase on the|Y
01|234646|2|3|importation of this product.  Any surcharge will be|Y
01|234646|2|4|disclosed prior to acceptance of an order.|Y
01|234647|5|1|A tariff surcharge may be added to this quotation in|Y
01|234647|5|2|the event of a sustained tariff increase on the|Y
01|234647|5|3|importation of this product.  Any surcharge will be|Y
01|234647|5|4|disclosed prior to acceptance of an order.|Y
01|234649|2|1|A tariff surcharge may be added to this quotation in|Y
01|234649|2|2|the event of a sustained tariff increase on the|Y
01|234649|2|3|importation of this product.  Any surcharge will be|Y
01|234649|2|4|disclosed prior to acceptance of an order.|Y
01|234650|5|1|A tariff surcharge may be added to this quotation in|Y
01|234650|5|2|the event of a sustained tariff increase on the|Y
01|234650|5|3|importation of this product.  Any surcharge will be|Y
01|234650|5|4|disclosed prior to acceptance of an order.|Y
01|234651|2|1|A tariff surcharge may be added to this quotation in|Y
01|234651|2|2|the event of a sustained tariff increase on the|Y
01|234651|2|3|importation of this product.  Any surcharge will be|Y
01|234651|2|4|disclosed prior to acceptance of an order.|Y
01|234652|2|1|A tariff surcharge may be added to this quotation in|Y
01|234652|2|2|the event of a sustained tariff increase on the|Y
01|234652|2|3|importation of this product.  Any surcharge will be|Y
01|234652|2|4|disclosed prior to acceptance of an order.|Y
01|234653|2|1|A tariff surcharge may be added to this quotation in|Y
01|234653|2|2|the event of a sustained tariff increase on the|Y
01|234653|2|3|importation of this product.  Any surcharge will be|Y
01|234653|2|4|disclosed prior to acceptance of an order.|Y
01|234654|2|1|A tariff surcharge may be added to this quotation in|Y
01|234654|2|2|the event of a sustained tariff increase on the|Y
01|234654|2|3|importation of this product.  Any surcharge will be|Y
01|234654|2|4|disclosed prior to acceptance of an order.|Y
01|234655|2|1|A tariff surcharge may be added to this quotation in|Y
01|234655|2|2|the event of a sustained tariff increase on the|Y
01|234655|2|3|importation of this product.  Any surcharge will be|Y
01|234655|2|4|disclosed prior to acceptance of an order.|Y
01|234656|2|1|A tariff surcharge may be added to this quotation in|Y
01|234656|2|2|the event of a sustained tariff increase on the|Y
01|234656|2|3|importation of this product.  Any surcharge will be|Y
01|234656|2|4|disclosed prior to acceptance of an order.|Y
01|234657|2|1|A tariff surcharge may be added to this quotation in|Y
01|234657|2|2|the event of a sustained tariff increase on the|Y
01|234657|2|3|importation of this product.  Any surcharge will be|Y
01|234657|2|4|disclosed prior to acceptance of an order.|Y
01|234658|13|1|A tariff surcharge may be added to this quotation in|Y
01|234658|13|2|the event of a sustained tariff increase on the|Y
01|234658|13|3|importation of this product.  Any surcharge will be|Y
01|234658|13|4|disclosed prior to acceptance of an order.|Y
01|234659|5|1|Estimated lead time is end of September/beginning of|Y
01|234659|5|2|October.|Y
01|234659|8|1|Quoted in place of 150U-gage length n/a|Y
01|234659|30|1|Alternate for SK25-25.5|Y
01|234659|31|1|Non-standard stock.Non-returnablenon-cancellable.|Y
01|234659|31|2|1 piece lead time is 2~3 weeks 2nd piece lead time is|Y
01|234659|31|3|approximately 14~16 weeks.|Y
01|234659|45|1|A tariff surcharge may be added to this quotation in|Y
01|234659|45|2|the event of a sustained tariff increase on the|Y
01|234659|45|3|importation of this product.  Any surcharge will be|Y
01|234659|45|4|disclosed prior to acceptance of an order.|Y
01|234660|10|1|A tariff surcharge may be added to this quotation in|Y
01|234660|10|2|the event of a sustained tariff increase on the|Y
01|234660|10|3|importation of this product.  Any surcharge will be|Y
01|234660|10|4|disclosed prior to acceptance of an order.|Y
01|234661|1|1|RGA#TOR-62014/|Y
01|234661|1|2|Repair of NCAT50-HC0750-3.50|Y
01|234661|4|1|A tariff surcharge may be added to this quotation in|Y
01|234661|4|2|the event of a sustained tariff increase on the|Y
01|234661|4|3|importation of this product.  Any surcharge will be|Y
01|234661|4|4|disclosed prior to acceptance of an order.|Y
01|234663|5|1|VMK12-1/8 2-pcs 1~2 Weeks ARO / Balance of 1-pc 13 Week|Y
01|234664|6|1|A tariff surcharge may be added to this quotation in|Y
01|234664|6|2|the event of a sustained tariff increase on the|Y
01|234664|6|3|importation of this product.  Any surcharge will be|Y
01|234664|6|4|disclosed prior to acceptance of an order.|Y
01|234665|2|1|A tariff surcharge may be added to this quotation in|Y
01|234665|2|2|the event of a sustained tariff increase on the|Y
01|234665|2|3|importation of this product.  Any surcharge will be|Y
01|234665|2|4|disclosed prior to acceptance of an order.|Y
01|234666|10|1|A tariff surcharge may be added to this quotation in|Y
01|234666|10|2|the event of a sustained tariff increase on the|Y
01|234666|10|3|importation of this product.  Any surcharge will be|Y
01|234666|10|4|disclosed prior to acceptance of an order.|Y
01|234667|2|1|A tariff surcharge may be added to this quotation in|Y
01|234667|2|2|the event of a sustained tariff increase on the|Y
01|234667|2|3|importation of this product.  Any surcharge will be|Y
01|234667|2|4|disclosed prior to acceptance of an order.|Y
01|234668|7|1|A tariff surcharge may be added to this quotation in|Y
01|234668|7|2|the event of a sustained tariff increase on the|Y
01|234668|7|3|importation of this product.  Any surcharge will be|Y
01|234668|7|4|disclosed prior to acceptance of an order.|Y
01|234669|2|1|A tariff surcharge may be added to this quotation in|Y
01|234669|2|2|the event of a sustained tariff increase on the|Y
01|234669|2|3|importation of this product.  Any surcharge will be|Y
01|234669|2|4|disclosed prior to acceptance of an order.|Y
01|234670|2|1|A tariff surcharge may be added to this quotation in|Y
01|234670|2|2|the event of a sustained tariff increase on the|Y
01|234670|2|3|importation of this product.  Any surcharge will be|Y
01|234670|2|4|disclosed prior to acceptance of an order.|Y
01|234671|3|1|A tariff surcharge may be added to this quotation in|Y
01|234671|3|2|the event of a sustained tariff increase on the|Y
01|234671|3|3|importation of this product.  Any surcharge will be|Y
01|234671|3|4|disclosed prior to acceptance of an order.|Y
01|234672|6|1|A tariff surcharge may be added to this quotation in|Y
01|234672|6|2|the event of a sustained tariff increase on the|Y
01|234672|6|3|importation of this product.  Any surcharge will be|Y
01|234672|6|4|disclosed prior to acceptance of an order.|Y
01|234673|2|1|A tariff surcharge may be added to this quotation in|Y
01|234673|2|2|the event of a sustained tariff increase on the|Y
01|234673|2|3|importation of this product.  Any surcharge will be|Y
01|234673|2|4|disclosed prior to acceptance of an order.|Y
01|234674|4|1|A tariff surcharge may be added to this quotation in|Y
01|234674|4|2|the event of a sustained tariff increase on the|Y
01|234674|4|3|importation of this product.  Any surcharge will be|Y
01|234674|4|4|disclosed prior to acceptance of an order.|Y
01|234675|5|1|A tariff surcharge may be added to this quotation in|Y
01|234675|5|2|the event of a sustained tariff increase on the|Y
01|234675|5|3|importation of this product.  Any surcharge will be|Y
01|234675|5|4|disclosed prior to acceptance of an order.|Y
01|234676|3|1|A tariff surcharge may be added to this quotation in|Y
01|234676|3|2|the event of a sustained tariff increase on the|Y
01|234676|3|3|importation of this product.  Any surcharge will be|Y
01|234676|3|4|disclosed prior to acceptance of an order.|Y
01|234677|3|1|A tariff surcharge may be added to this quotation in|Y
01|234677|3|2|the event of a sustained tariff increase on the|Y
01|234677|3|3|importation of this product.  Any surcharge will be|Y
01|234677|3|4|disclosed prior to acceptance of an order.|Y
01|234678|2|1|A tariff surcharge may be added to this quotation in|Y
01|234678|2|2|the event of a sustained tariff increase on the|Y
01|234678|2|3|importation of this product.  Any surcharge will be|Y
01|234678|2|4|disclosed prior to acceptance of an order.|Y
01|234679|6|1|A tariff surcharge may be added to this quotation in|Y
01|234679|6|2|the event of a sustained tariff increase on the|Y
01|234679|6|3|importation of this product.  Any surcharge will be|Y
01|234679|6|4|disclosed prior to acceptance of an order.|Y
01|234680|2|1|A tariff surcharge may be added to this quotation in|Y
01|234680|2|2|the event of a sustained tariff increase on the|Y
01|234680|2|3|importation of this product.  Any surcharge will be|Y
01|234680|2|4|disclosed prior to acceptance of an order.|Y
01|234681|2|1|A tariff surcharge may be added to this quotation in|Y
01|234681|2|2|the event of a sustained tariff increase on the|Y
01|234681|2|3|importation of this product.  Any surcharge will be|Y
01|234681|2|4|disclosed prior to acceptance of an order.|Y
01|234682|1|1|RGA#TAR-62042|Y
01|234682|1|2|5AX-201FA-M|Y
01|234682|1|3|SN:5535|Y
01|234682|2|1|CUSTOMER TABLE RETURN|Y
01|234682|2|2|RGA#TAR-62042|Y
01|234682|2|3|5AX-201FA-M SN:5535|Y
01|234682|3|1|A tariff surcharge may be added to this quotation in|Y
01|234682|3|2|the event of a sustained tariff increase on the|Y
01|234682|3|3|importation of this product.  Any surcharge will be|Y
01|234682|3|4|disclosed prior to acceptance of an order.|Y
01|234683|69|1|A tariff surcharge may be added to this quotation in|Y
01|234683|69|2|the event of a sustained tariff increase on the|Y
01|234683|69|3|importation of this product.  Any surcharge will be|Y
01|234683|69|4|disclosed prior to acceptance of an order.|Y
01|234684|2|1|A tariff surcharge may be added to this quotation in|Y
01|234684|2|2|the event of a sustained tariff increase on the|Y
01|234684|2|3|importation of this product.  Any surcharge will be|Y
01|234684|2|4|disclosed prior to acceptance of an order.|Y
01|234685|2|1|A tariff surcharge may be added to this quotation in|Y
01|234685|2|2|the event of a sustained tariff increase on the|Y
01|234685|2|3|importation of this product.  Any surcharge will be|Y
01|234685|2|4|disclosed prior to acceptance of an order.|Y
01|234686|2|1|A tariff surcharge may be added to this quotation in|Y
01|234686|2|2|the event of a sustained tariff increase on the|Y
01|234686|2|3|importation of this product.  Any surcharge will be|Y
01|234686|2|4|disclosed prior to acceptance of an order.|Y
01|234687|3|1|A tariff surcharge may be added to this quotation in|Y
01|234687|3|2|the event of a sustained tariff increase on the|Y
01|234687|3|3|importation of this product.  Any surcharge will be|Y
01|234687|3|4|disclosed prior to acceptance of an order.|Y
01|234688|4|1|A tariff surcharge may be added to this quotation in|Y
01|234688|4|2|the event of a sustained tariff increase on the|Y
01|234688|4|3|importation of this product.  Any surcharge will be|Y
01|234688|4|4|disclosed prior to acceptance of an order.|Y
01|234689|2|1|A tariff surcharge may be added to this quotation in|Y
01|234689|2|2|the event of a sustained tariff increase on the|Y
01|234689|2|3|importation of this product.  Any surcharge will be|Y
01|234689|2|4|disclosed prior to acceptance of an order.|Y
01|234690|19|1|A tariff surcharge may be added to this quotation in|Y
01|234690|19|2|the event of a sustained tariff increase on the|Y
01|234690|19|3|importation of this product.  Any surcharge will be|Y
01|234690|19|4|disclosed prior to acceptance of an order.|Y
01|234691|8|1|A tariff surcharge may be added to this quotation in|Y
01|234691|8|2|the event of a sustained tariff increase on the|Y
01|234691|8|3|importation of this product.  Any surcharge will be|Y
01|234691|8|4|disclosed prior to acceptance of an order.|Y
01|234692|2|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|234692|2|2|of spindle drawing information. *NET price|Y
01|234692|3|1|A tariff surcharge may be added to this quotation in|Y
01|234692|3|2|the event of a sustained tariff increase on the|Y
01|234692|3|3|importation of this product.  Any surcharge will be|Y
01|234692|3|4|disclosed prior to acceptance of an order.|Y
01|234693|3|1|A tariff surcharge may be added to this quotation in|Y
01|234693|3|2|the event of a sustained tariff increase on the|Y
01|234693|3|3|importation of this product.  Any surcharge will be|Y
01|234693|3|4|disclosed prior to acceptance of an order.|Y
01|234694|17|1|A tariff surcharge may be added to this quotation in|Y
01|234694|17|2|the event of a sustained tariff increase on the|Y
01|234694|17|3|importation of this product.  Any surcharge will be|Y
01|234694|17|4|disclosed prior to acceptance of an order.|Y
01|234695|3|1|A tariff surcharge may be added to this quotation in|Y
01|234695|3|2|the event of a sustained tariff increase on the|Y
01|234695|3|3|importation of this product.  Any surcharge will be|Y
01|234695|3|4|disclosed prior to acceptance of an order.|Y
01|234696|1|1|HSK100A-SK16C-200P-IDU|Y
01|234696|15|1|A tariff surcharge may be added to this quotation in|Y
01|234696|15|2|the event of a sustained tariff increase on the|Y
01|234696|15|3|importation of this product.  Any surcharge will be|Y
01|234696|15|4|disclosed prior to acceptance of an order.|Y
01|234697|2|1|A tariff surcharge may be added to this quotation in|Y
01|234697|2|2|the event of a sustained tariff increase on the|Y
01|234697|2|3|importation of this product.  Any surcharge will be|Y
01|234697|2|4|disclosed prior to acceptance of an order.|Y
01|234698|12|1|A tariff surcharge may be added to this quotation in|Y
01|234698|12|2|the event of a sustained tariff increase on the|Y
01|234698|12|3|importation of this product.  Any surcharge will be|Y
01|234698|12|4|disclosed prior to acceptance of an order.|Y
01|234699|4|1|A tariff surcharge may be added to this quotation in|Y
01|234699|4|2|the event of a sustained tariff increase on the|Y
01|234699|4|3|importation of this product.  Any surcharge will be|Y
01|234699|4|4|disclosed prior to acceptance of an order.|Y
01|234700|11|1|A tariff surcharge may be added to this quotation in|Y
01|234700|11|2|the event of a sustained tariff increase on the|Y
01|234700|11|3|importation of this product.  Any surcharge will be|Y
01|234700|11|4|disclosed prior to acceptance of an order.|Y
01|234701|3|1|A tariff surcharge may be added to this quotation in|Y
01|234701|3|2|the event of a sustained tariff increase on the|Y
01|234701|3|3|importation of this product.  Any surcharge will be|Y
01|234701|3|4|disclosed prior to acceptance of an order.|Y
01|234702|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|234702|2|1|Req.INS/#1010371/Orizon *Spec Changed Makino Pin Locati|Y
01|234702|3|1|Req.INS/#1010371/Orizon *Spec Changed Makino Pin Locati|Y
01|234702|3|2|To instal E32-NUT & ER32-SCREW(C)|Y
01|234702|4|1|Req.INS/#1010371/Orizon *Spec Changed Makino Pin Locati|Y
01|234702|5|1|Req.INS/#1010371/Orizon *Spec Changed Makino Pin Locati|Y
01|234702|6|1|Req.INS/#1010371/Orizon *Spec Changed Makino Pin Locati|Y
01|234702|7|1|A tariff surcharge may be added to this quotation in|Y
01|234702|7|2|the event of a sustained tariff increase on the|Y
01|234702|7|3|importation of this product.  Any surcharge will be|Y
01|234702|7|4|disclosed prior to acceptance of an order.|Y
01|234703|1|1|RGA#TAR-61999|Y
01|234703|1|2|5AX-201FA-M / SN: 4187|Y
01|234703|51|1|A tariff surcharge may be added to this quotation in|Y
01|234703|51|2|the event of a sustained tariff increase on the|Y
01|234703|51|3|importation of this product.  Any surcharge will be|Y
01|234703|51|4|disclosed prior to acceptance of an order.|Y
01|234704|5|1|A tariff surcharge may be added to this quotation in|Y
01|234704|5|2|the event of a sustained tariff increase on the|Y
01|234704|5|3|importation of this product.  Any surcharge will be|Y
01|234704|5|4|disclosed prior to acceptance of an order.|Y
01|234705|4|1|A tariff surcharge may be added to this quotation in|Y
01|234705|4|2|the event of a sustained tariff increase on the|Y
01|234705|4|3|importation of this product.  Any surcharge will be|Y
01|234705|4|4|disclosed prior to acceptance of an order.|Y
01|234706|2|1|A tariff surcharge may be added to this quotation in|Y
01|234706|2|2|the event of a sustained tariff increase on the|Y
01|234706|2|3|importation of this product.  Any surcharge will be|Y
01|234706|2|4|disclosed prior to acceptance of an order.|Y
01|234707|3|1|A tariff surcharge may be added to this quotation in|Y
01|234707|3|2|the event of a sustained tariff increase on the|Y
01|234707|3|3|importation of this product.  Any surcharge will be|Y
01|234707|3|4|disclosed prior to acceptance of an order.|Y
01|234708|2|1|A tariff surcharge may be added to this quotation in|Y
01|234708|2|2|the event of a sustained tariff increase on the|Y
01|234708|2|3|importation of this product.  Any surcharge will be|Y
01|234708|2|4|disclosed prior to acceptance of an order.|Y
01|234709|2|1|A tariff surcharge may be added to this quotation in|Y
01|234709|2|2|the event of a sustained tariff increase on the|Y
01|234709|2|3|importation of this product.  Any surcharge will be|Y
01|234709|2|4|disclosed prior to acceptance of an order.|Y
01|234710|3|1|A tariff surcharge may be added to this quotation in|Y
01|234710|3|2|the event of a sustained tariff increase on the|Y
01|234710|3|3|importation of this product.  Any surcharge will be|Y
01|234710|3|4|disclosed prior to acceptance of an order.|Y
01|234711|12|1|A tariff surcharge may be added to this quotation in|Y
01|234711|12|2|the event of a sustained tariff increase on the|Y
01|234711|12|3|importation of this product.  Any surcharge will be|Y
01|234711|12|4|disclosed prior to acceptance of an order.|Y
01|234712|2|1|A tariff surcharge may be added to this quotation in|Y
01|234712|2|2|the event of a sustained tariff increase on the|Y
01|234712|2|3|importation of this product.  Any surcharge will be|Y
01|234712|2|4|disclosed prior to acceptance of an order.|Y
01|234713|3|1|A tariff surcharge may be added to this quotation in|Y
01|234713|3|2|the event of a sustained tariff increase on the|Y
01|234713|3|3|importation of this product.  Any surcharge will be|Y
01|234713|3|4|disclosed prior to acceptance of an order.|Y
01|234714|2|1|A tariff surcharge may be added to this quotation in|Y
01|234714|2|2|the event of a sustained tariff increase on the|Y
01|234714|2|3|importation of this product.  Any surcharge will be|Y
01|234714|2|4|disclosed prior to acceptance of an order.|Y
01|234715|3|1|A tariff surcharge may be added to this quotation in|Y
01|234715|3|2|the event of a sustained tariff increase on the|Y
01|234715|3|3|importation of this product.  Any surcharge will be|Y
01|234715|3|4|disclosed prior to acceptance of an order.|Y
01|234716|8|1|A tariff surcharge may be added to this quotation in|Y
01|234716|8|2|the event of a sustained tariff increase on the|Y
01|234716|8|3|importation of this product.  Any surcharge will be|Y
01|234716|8|4|disclosed prior to acceptance of an order.|Y
01|234717|5|1|A tariff surcharge may be added to this quotation in|Y
01|234717|5|2|the event of a sustained tariff increase on the|Y
01|234717|5|3|importation of this product.  Any surcharge will be|Y
01|234717|5|4|disclosed prior to acceptance of an order.|Y
01|234718|18|1|A tariff surcharge may be added to this quotation in|Y
01|234718|18|2|the event of a sustained tariff increase on the|Y
01|234718|18|3|importation of this product.  Any surcharge will be|Y
01|234718|18|4|disclosed prior to acceptance of an order.|Y
01|234719|8|1|A tariff surcharge may be added to this quotation in|Y
01|234719|8|2|the event of a sustained tariff increase on the|Y
01|234719|8|3|importation of this product.  Any surcharge will be|Y
01|234719|8|4|disclosed prior to acceptance of an order.|Y
01|234720|8|1|A tariff surcharge may be added to this quotation in|Y
01|234720|8|2|the event of a sustained tariff increase on the|Y
01|234720|8|3|importation of this product.  Any surcharge will be|Y
01|234720|8|4|disclosed prior to acceptance of an order.|Y
01|234721|36|1|A tariff surcharge may be added to this quotation in|Y
01|234721|36|2|the event of a sustained tariff increase on the|Y
01|234721|36|3|importation of this product.  Any surcharge will be|Y
01|234721|36|4|disclosed prior to acceptance of an order.|Y
01|234722|2|1|A tariff surcharge may be added to this quotation in|Y
01|234722|2|2|the event of a sustained tariff increase on the|Y
01|234722|2|3|importation of this product.  Any surcharge will be|Y
01|234722|2|4|disclosed prior to acceptance of an order.|Y
01|234723|1|1|2 pc. Overrun for PO#PO-Z-2252313  SO#1009702|Y
01|234723|1|2|**NET Price special one-time overrun pricing**|Y
01|234723|2|1|A tariff surcharge may be added to this quotation in|Y
01|234723|2|2|the event of a sustained tariff increase on the|Y
01|234723|2|3|importation of this product.  Any surcharge will be|Y
01|234723|2|4|disclosed prior to acceptance of an order.|Y
01|234724|2|1|A tariff surcharge may be added to this quotation in|Y
01|234724|2|2|the event of a sustained tariff increase on the|Y
01|234724|2|3|importation of this product.  Any surcharge will be|Y
01|234724|2|4|disclosed prior to acceptance of an order.|Y
01|234725|2|1|A tariff surcharge may be added to this quotation in|Y
01|234725|2|2|the event of a sustained tariff increase on the|Y
01|234725|2|3|importation of this product.  Any surcharge will be|Y
01|234725|2|4|disclosed prior to acceptance of an order.|Y
01|234726|5|1|A tariff surcharge may be added to this quotation in|Y
01|234726|5|2|the event of a sustained tariff increase on the|Y
01|234726|5|3|importation of this product.  Any surcharge will be|Y
01|234726|5|4|disclosed prior to acceptance of an order.|Y
01|234727|2|1|A tariff surcharge may be added to this quotation in|Y
01|234727|2|2|the event of a sustained tariff increase on the|Y
01|234727|2|3|importation of this product.  Any surcharge will be|Y
01|234727|2|4|disclosed prior to acceptance of an order.|Y
01|234728|2|1|A tariff surcharge may be added to this quotation in|Y
01|234728|2|2|the event of a sustained tariff increase on the|Y
01|234728|2|3|importation of this product.  Any surcharge will be|Y
01|234728|2|4|disclosed prior to acceptance of an order.|Y
01|234729|4|1|A tariff surcharge may be added to this quotation in|Y
01|234729|4|2|the event of a sustained tariff increase on the|Y
01|234729|4|3|importation of this product.  Any surcharge will be|Y
01|234729|4|4|disclosed prior to acceptance of an order.|Y
01|234730|2|1|A tariff surcharge may be added to this quotation in|Y
01|234730|2|2|the event of a sustained tariff increase on the|Y
01|234730|2|3|importation of this product.  Any surcharge will be|Y
01|234730|2|4|disclosed prior to acceptance of an order.|Y
01|234731|2|1|A tariff surcharge may be added to this quotation in|Y
01|234731|2|2|the event of a sustained tariff increase on the|Y
01|234731|2|3|importation of this product.  Any surcharge will be|Y
01|234731|2|4|disclosed prior to acceptance of an order.|Y
01|234732|2|1|A tariff surcharge may be added to this quotation in|Y
01|234732|2|2|the event of a sustained tariff increase on the|Y
01|234732|2|3|importation of this product.  Any surcharge will be|Y
01|234732|2|4|disclosed prior to acceptance of an order.|Y
01|234733|2|1|A tariff surcharge may be added to this quotation in|Y
01|234733|2|2|the event of a sustained tariff increase on the|Y
01|234733|2|3|importation of this product.  Any surcharge will be|Y
01|234733|2|4|disclosed prior to acceptance of an order.|Y
01|234734|2|1|A tariff surcharge may be added to this quotation in|Y
01|234734|2|2|the event of a sustained tariff increase on the|Y
01|234734|2|3|importation of this product.  Any surcharge will be|Y
01|234734|2|4|disclosed prior to acceptance of an order.|Y
01|234735|31|1|A tariff surcharge may be added to this quotation in|Y
01|234735|31|2|the event of a sustained tariff increase on the|Y
01|234735|31|3|importation of this product.  Any surcharge will be|Y
01|234735|31|4|disclosed prior to acceptance of an order.|Y
01|234736|2|1|A tariff surcharge may be added to this quotation in|Y
01|234736|2|2|the event of a sustained tariff increase on the|Y
01|234736|2|3|importation of this product.  Any surcharge will be|Y
01|234736|2|4|disclosed prior to acceptance of an order.|Y
01|234737|2|1|A tariff surcharge may be added to this quotation in|Y
01|234737|2|2|the event of a sustained tariff increase on the|Y
01|234737|2|3|importation of this product.  Any surcharge will be|Y
01|234737|2|4|disclosed prior to acceptance of an order.|Y
01|234738|2|1|A tariff surcharge may be added to this quotation in|Y
01|234738|2|2|the event of a sustained tariff increase on the|Y
01|234738|2|3|importation of this product.  Any surcharge will be|Y
01|234738|2|4|disclosed prior to acceptance of an order.|Y
01|234739|2|1|A tariff surcharge may be added to this quotation in|Y
01|234739|2|2|the event of a sustained tariff increase on the|Y
01|234739|2|3|importation of this product.  Any surcharge will be|Y
01|234739|2|4|disclosed prior to acceptance of an order.|Y
01|234740|5|1|A tariff surcharge may be added to this quotation in|Y
01|234740|5|2|the event of a sustained tariff increase on the|Y
01|234740|5|3|importation of this product.  Any surcharge will be|Y
01|234740|5|4|disclosed prior to acceptance of an order.|Y
01|234741|1|1|Final Part# TBD **NET Price** **5pc MOQ**|Y
01|234741|1|2|CAT50 End Mill Holder 1 10.00 GL 1.45 Nose Dia|Y
01|234741|1|3|.|Y
01|234741|1|4|DELIVERY: Please allow 1-2 Weeks for design. MFG +|Y
01|234741|1|5|Shipping is 24 Weeks after approval drawing is signed|Y
01|234741|1|6|by the customer.|Y
01|234741|2|1|Final Part# TBD **NET Price** **5pc MOQ**|Y
01|234741|2|2|CAT50 End Mill Holder 1 10.00 GL 1.95 Nose Dia|Y
01|234741|2|3|.|Y
01|234741|2|4|DELIVERY: Please allow 1-2 Weeks for design. MFG +|Y
01|234741|2|5|Shipping is 24 Weeks after approval drawing is signed|Y
01|234741|2|6|by the customer.|Y
01|234741|12|1|A tariff surcharge may be added to this quotation in|Y
01|234741|12|2|the event of a sustained tariff increase on the|Y
01|234741|12|3|importation of this product.  Any surcharge will be|Y
01|234741|12|4|disclosed prior to acceptance of an order.|Y
01|234742|1|1|Special Pricing based off of a 8 table project|Y
01|234742|1|2|Includes Nikken 5AX201YA-MPower and feedback cables|Y
01|234742|1|3|from Nikken to Machine Bulkhead. Enduser will need the|Y
01|234742|1|4|4th and 5th axis interface and 3rd party software|Y
01|234742|1|5|option from Haas.|Y
01|234742|2|1|Factory Installation|Y
01|234742|5|1|A tariff surcharge may be added to this quotation in|Y
01|234742|5|2|the event of a sustained tariff increase on the|Y
01|234742|5|3|importation of this product.  Any surcharge will be|Y
01|234742|5|4|disclosed prior to acceptance of an order.|Y
01|234743|2|1|A tariff surcharge may be added to this quotation in|Y
01|234743|2|2|the event of a sustained tariff increase on the|Y
01|234743|2|3|importation of this product.  Any surcharge will be|Y
01|234743|2|4|disclosed prior to acceptance of an order.|Y
01|234744|1|1|Estimated lead time is end of August/beginning of|Y
01|234744|1|2|September.|Y
01|234744|5|1|A tariff surcharge may be added to this quotation in|Y
01|234744|5|2|the event of a sustained tariff increase on the|Y
01|234744|5|3|importation of this product.  Any surcharge will be|Y
01|234744|5|4|disclosed prior to acceptance of an order.|Y
01|234745|2|1|A tariff surcharge may be added to this quotation in|Y
01|234745|2|2|the event of a sustained tariff increase on the|Y
01|234745|2|3|importation of this product.  Any surcharge will be|Y
01|234745|2|4|disclosed prior to acceptance of an order.|Y
01|234747|3|1|A tariff surcharge may be added to this quotation in|Y
01|234747|3|2|the event of a sustained tariff increase on the|Y
01|234747|3|3|importation of this product.  Any surcharge will be|Y
01|234747|3|4|disclosed prior to acceptance of an order.|Y
01|234748|2|1|A tariff surcharge may be added to this quotation in|Y
01|234748|2|2|the event of a sustained tariff increase on the|Y
01|234748|2|3|importation of this product.  Any surcharge will be|Y
01|234748|2|4|disclosed prior to acceptance of an order.|Y
01|234749|2|1|A tariff surcharge may be added to this quotation in|Y
01|234749|2|2|the event of a sustained tariff increase on the|Y
01|234749|2|3|importation of this product.  Any surcharge will be|Y
01|234749|2|4|disclosed prior to acceptance of an order.|Y
01|234750|6|1|A tariff surcharge may be added to this quotation in|Y
01|234750|6|2|the event of a sustained tariff increase on the|Y
01|234750|6|3|importation of this product.  Any surcharge will be|Y
01|234750|6|4|disclosed prior to acceptance of an order.|Y
01|234751|4|1|A tariff surcharge may be added to this quotation in|Y
01|234751|4|2|the event of a sustained tariff increase on the|Y
01|234751|4|3|importation of this product.  Any surcharge will be|Y
01|234751|4|4|disclosed prior to acceptance of an order.|Y
01|234752|2|1|A tariff surcharge may be added to this quotation in|Y
01|234752|2|2|the event of a sustained tariff increase on the|Y
01|234752|2|3|importation of this product.  Any surcharge will be|Y
01|234752|2|4|disclosed prior to acceptance of an order.|Y
01|234753|2|1|A tariff surcharge may be added to this quotation in|Y
01|234753|2|2|the event of a sustained tariff increase on the|Y
01|234753|2|3|importation of this product.  Any surcharge will be|Y
01|234753|2|4|disclosed prior to acceptance of an order.|Y
01|234754|15|1|Alternative of N-71|Y
01|234754|17|1|A tariff surcharge may be added to this quotation in|Y
01|234754|17|2|the event of a sustained tariff increase on the|Y
01|234754|17|3|importation of this product.  Any surcharge will be|Y
01|234754|17|4|disclosed prior to acceptance of an order.|Y
01|234755|3|1|A tariff surcharge may be added to this quotation in|Y
01|234755|3|2|the event of a sustained tariff increase on the|Y
01|234755|3|3|importation of this product.  Any surcharge will be|Y
01|234755|3|4|disclosed prior to acceptance of an order.|Y
01|234756|2|1|A tariff surcharge may be added to this quotation in|Y
01|234756|2|2|the event of a sustained tariff increase on the|Y
01|234756|2|3|importation of this product.  Any surcharge will be|Y
01|234756|2|4|disclosed prior to acceptance of an order.|Y
01|234757|4|1|A tariff surcharge may be added to this quotation in|Y
01|234757|4|2|the event of a sustained tariff increase on the|Y
01|234757|4|3|importation of this product.  Any surcharge will be|Y
01|234757|4|4|disclosed prior to acceptance of an order.|Y
01|234758|5|1|A tariff surcharge may be added to this quotation in|Y
01|234758|5|2|the event of a sustained tariff increase on the|Y
01|234758|5|3|importation of this product.  Any surcharge will be|Y
01|234758|5|4|disclosed prior to acceptance of an order.|Y
01|234760|2|1|Please note additional 20% applied per overstock promo.|Y
01|234760|2|2|Once PO/order has been issued these can't be cancelled|Y
01|234760|2|3|or returned. These will need to be requoted upon stock|Y
01|234760|2|4|depletion.|Y
01|234760|5|1|A tariff surcharge may be added to this quotation in|Y
01|234760|5|2|the event of a sustained tariff increase on the|Y
01|234760|5|3|importation of this product.  Any surcharge will be|Y
01|234760|5|4|disclosed prior to acceptance of an order.|Y
01|234761|7|1|A tariff surcharge may be added to this quotation in|Y
01|234761|7|2|the event of a sustained tariff increase on the|Y
01|234761|7|3|importation of this product.  Any surcharge will be|Y
01|234761|7|4|disclosed prior to acceptance of an order.|Y
01|234762|1|1|T/P Inspection Required.|Y
01|234762|2|1|T/P Inspection Required.|Y
01|234762|4|1|T/P Inspection Required.|Y
01|234762|5|1|T/P Inspection Required.|Y
01|234762|6|1|T/P Inspection Required.|Y
01|234762|7|1|T/P Inspection Required.|Y
01|234762|8|1|T/P Inspection Required.|Y
01|234762|9|1|T/P Inspection Required.|Y
01|234762|10|1|T/P Inspection Required.|Y
01|234762|11|1|T/P Inspection Required.|Y
01|234762|12|1|T/P Inspection Required.|Y
01|234762|13|1|T/P Inspection Required.|Y
01|234762|14|1|T/P Inspection Required.|Y
01|234762|15|1|T/P Inspection Required.|Y
01|234762|16|1|T/P Inspection Required.|Y
01|234762|17|1|T/P Inspection Required.|Y
01|234762|18|1|T/P Inspection Required.|Y
01|234762|19|1|T/P Inspection Required.|Y
01|234762|20|1|T/P Inspection Required.|Y
01|234762|21|1|T/P Inspection Required.|Y
01|234762|22|1|T/P Inspection Required.|Y
01|234762|23|1|T/P Inspection Required.|Y
01|234762|24|1|T/P Inspection Required.|Y
01|234762|25|1|A tariff surcharge may be added to this quotation in|Y
01|234762|25|2|the event of a sustained tariff increase on the|Y
01|234762|25|3|importation of this product.  Any surcharge will be|Y
01|234762|25|4|disclosed prior to acceptance of an order.|Y
01|234763|2|1|A tariff surcharge may be added to this quotation in|Y
01|234763|2|2|the event of a sustained tariff increase on the|Y
01|234763|2|3|importation of this product.  Any surcharge will be|Y
01|234763|2|4|disclosed prior to acceptance of an order.|Y
01|234764|3|1|A tariff surcharge may be added to this quotation in|Y
01|234764|3|2|the event of a sustained tariff increase on the|Y
01|234764|3|3|importation of this product.  Any surcharge will be|Y
01|234764|3|4|disclosed prior to acceptance of an order.|Y
01|234766|2|1|A tariff surcharge may be added to this quotation in|Y
01|234766|2|2|the event of a sustained tariff increase on the|Y
01|234766|2|3|importation of this product.  Any surcharge will be|Y
01|234766|2|4|disclosed prior to acceptance of an order.|Y
01|234767|2|1|A tariff surcharge may be added to this quotation in|Y
01|234767|2|2|the event of a sustained tariff increase on the|Y
01|234767|2|3|importation of this product.  Any surcharge will be|Y
01|234767|2|4|disclosed prior to acceptance of an order.|Y
01|234768|2|1|Additional 20% discount has been applied for our|Y
01|234768|2|2|overstock promotion.  Once a Purchase Order has been|Y
01|234768|2|3|received this item cannot be cancelled or returned.|Y
01|234768|3|1|A tariff surcharge may be added to this quotation in|Y
01|234768|3|2|the event of a sustained tariff increase on the|Y
01|234768|3|3|importation of this product.  Any surcharge will be|Y
01|234768|3|4|disclosed prior to acceptance of an order.|Y
01|234769|4|1|A tariff surcharge may be added to this quotation in|Y
01|234769|4|2|the event of a sustained tariff increase on the|Y
01|234769|4|3|importation of this product.  Any surcharge will be|Y
01|234769|4|4|disclosed prior to acceptance of an order.|Y
01|234770|4|1|A tariff surcharge may be added to this quotation in|Y
01|234770|4|2|the event of a sustained tariff increase on the|Y
01|234770|4|3|importation of this product.  Any surcharge will be|Y
01|234770|4|4|disclosed prior to acceptance of an order.|Y
01|234771|2|1|A tariff surcharge may be added to this quotation in|Y
01|234771|2|2|the event of a sustained tariff increase on the|Y
01|234771|2|3|importation of this product.  Any surcharge will be|Y
01|234771|2|4|disclosed prior to acceptance of an order.|Y
01|234772|2|1|A tariff surcharge may be added to this quotation in|Y
01|234772|2|2|the event of a sustained tariff increase on the|Y
01|234772|2|3|importation of this product.  Any surcharge will be|Y
01|234772|2|4|disclosed prior to acceptance of an order.|Y
01|234773|2|1|A tariff surcharge may be added to this quotation in|Y
01|234773|2|2|the event of a sustained tariff increase on the|Y
01|234773|2|3|importation of this product.  Any surcharge will be|Y
01|234773|2|4|disclosed prior to acceptance of an order.|Y
01|234774|3|1|A tariff surcharge may be added to this quotation in|Y
01|234774|3|2|the event of a sustained tariff increase on the|Y
01|234774|3|3|importation of this product.  Any surcharge will be|Y
01|234774|3|4|disclosed prior to acceptance of an order.|Y
01|234775|-13|1|A tariff surcharge may be added to this quotation in|Y
01|234775|-13|2|the event of a sustained tariff increase on the|Y
01|234775|-13|3|importation of this product.  Any surcharge will be|Y
01|234775|-13|4|disclosed prior to acceptance of an order.|Y
01|234776|2|1|A tariff surcharge may be added to this quotation in|Y
01|234776|2|2|the event of a sustained tariff increase on the|Y
01|234776|2|3|importation of this product.  Any surcharge will be|Y
01|234776|2|4|disclosed prior to acceptance of an order.|Y
01|234777|2|1|A tariff surcharge may be added to this quotation in|Y
01|234777|2|2|the event of a sustained tariff increase on the|Y
01|234777|2|3|importation of this product.  Any surcharge will be|Y
01|234777|2|4|disclosed prior to acceptance of an order.|Y
01|234778|2|1|A tariff surcharge may be added to this quotation in|Y
01|234778|2|2|the event of a sustained tariff increase on the|Y
01|234778|2|3|importation of this product.  Any surcharge will be|Y
01|234778|2|4|disclosed prior to acceptance of an order.|Y
01|234779|1|1|Base Plate for 5AX201-YA-M to Zero Clamp Pneumatic|Y
01|234779|2|1|Pneumatic Self Centering Vise|Y
01|234779|6|1|A tariff surcharge may be added to this quotation in|Y
01|234779|6|2|the event of a sustained tariff increase on the|Y
01|234779|6|3|importation of this product.  Any surcharge will be|Y
01|234779|6|4|disclosed prior to acceptance of an order.|Y
01|234780|2|1|A tariff surcharge may be added to this quotation in|Y
01|234780|2|2|the event of a sustained tariff increase on the|Y
01|234780|2|3|importation of this product.  Any surcharge will be|Y
01|234780|2|4|disclosed prior to acceptance of an order.|Y
01|234781|5|1|A tariff surcharge may be added to this quotation in|Y
01|234781|5|2|the event of a sustained tariff increase on the|Y
01|234781|5|3|importation of this product.  Any surcharge will be|Y
01|234781|5|4|disclosed prior to acceptance of an order.|Y
01|234782|3|1|A tariff surcharge may be added to this quotation in|Y
01|234782|3|2|the event of a sustained tariff increase on the|Y
01|234782|3|3|importation of this product.  Any surcharge will be|Y
01|234782|3|4|disclosed prior to acceptance of an order.|Y
01|234783|2|1|A tariff surcharge may be added to this quotation in|Y
01|234783|2|2|the event of a sustained tariff increase on the|Y
01|234783|2|3|importation of this product.  Any surcharge will be|Y
01|234783|2|4|disclosed prior to acceptance of an order.|Y
01|234784|2|1|A tariff surcharge may be added to this quotation in|Y
01|234784|2|2|the event of a sustained tariff increase on the|Y
01|234784|2|3|importation of this product.  Any surcharge will be|Y
01|234784|2|4|disclosed prior to acceptance of an order.|Y
01|234785|2|1|A tariff surcharge may be added to this quotation in|Y
01|234785|2|2|the event of a sustained tariff increase on the|Y
01|234785|2|3|importation of this product.  Any surcharge will be|Y
01|234785|2|4|disclosed prior to acceptance of an order.|Y
01|234787|3|1|**Overstock Item - Cannot be cancelled or returned**|Y
01|234787|6|1|A tariff surcharge may be added to this quotation in|Y
01|234787|6|2|the event of a sustained tariff increase on the|Y
01|234787|6|3|importation of this product.  Any surcharge will be|Y
01|234787|6|4|disclosed prior to acceptance of an order.|Y
01|234788|12|1|A tariff surcharge may be added to this quotation in|Y
01|234788|12|2|the event of a sustained tariff increase on the|Y
01|234788|12|3|importation of this product.  Any surcharge will be|Y
01|234788|12|4|disclosed prior to acceptance of an order.|Y
01|234789|19|1|A tariff surcharge may be added to this quotation in|Y
01|234789|19|2|the event of a sustained tariff increase on the|Y
01|234789|19|3|importation of this product.  Any surcharge will be|Y
01|234789|19|4|disclosed prior to acceptance of an order.|Y
01|234790|30|1|A tariff surcharge may be added to this quotation in|Y
01|234790|30|2|the event of a sustained tariff increase on the|Y
01|234790|30|3|importation of this product.  Any surcharge will be|Y
01|234790|30|4|disclosed prior to acceptance of an order.|Y
01|234791|1|1|RGA#LVR-62063/|Y
01|234791|1|2|Repair of MZQT47-ER32Z-MS-OFF s/n: 21900363 01|Y
01|234791|1|3|(Mimatic#183779)|Y
01|234791|2|1|Bearings seals and o-rings to be replaced.|Y
01|234791|3|1|A tariff surcharge may be added to this quotation in|Y
01|234791|3|2|the event of a sustained tariff increase on the|Y
01|234791|3|3|importation of this product.  Any surcharge will be|Y
01|234791|3|4|disclosed prior to acceptance of an order.|Y
01|234792|2|1|A tariff surcharge may be added to this quotation in|Y
01|234792|2|2|the event of a sustained tariff increase on the|Y
01|234792|2|3|importation of this product.  Any surcharge will be|Y
01|234792|2|4|disclosed prior to acceptance of an order.|Y
01|234793|4|1|A tariff surcharge may be added to this quotation in|Y
01|234793|4|2|the event of a sustained tariff increase on the|Y
01|234793|4|3|importation of this product.  Any surcharge will be|Y
01|234793|4|4|disclosed prior to acceptance of an order.|Y
01|234794|1|1|NBT50-SF12-100CP|Y
01|234794|2|1|A tariff surcharge may be added to this quotation in|Y
01|234794|2|2|the event of a sustained tariff increase on the|Y
01|234794|2|3|importation of this product.  Any surcharge will be|Y
01|234794|2|4|disclosed prior to acceptance of an order.|Y
01|234795|6|1|A tariff surcharge may be added to this quotation in|Y
01|234795|6|2|the event of a sustained tariff increase on the|Y
01|234795|6|3|importation of this product.  Any surcharge will be|Y
01|234795|6|4|disclosed prior to acceptance of an order.|Y
01|234796|-13|1|A tariff surcharge may be added to this quotation in|Y
01|234796|-13|2|the event of a sustained tariff increase on the|Y
01|234796|-13|3|importation of this product.  Any surcharge will be|Y
01|234796|-13|4|disclosed prior to acceptance of an order.|Y
01|234797|19|1|A tariff surcharge may be added to this quotation in|Y
01|234797|19|2|the event of a sustained tariff increase on the|Y
01|234797|19|3|importation of this product.  Any surcharge will be|Y
01|234797|19|4|disclosed prior to acceptance of an order.|Y
01|234798|1|1|**non-cancellable non-returnable**|Y
01|234798|7|1|**non-cancellable non-returnable**|Y
01|234798|9|1|A tariff surcharge may be added to this quotation in|Y
01|234798|9|2|the event of a sustained tariff increase on the|Y
01|234798|9|3|importation of this product.  Any surcharge will be|Y
01|234798|9|4|disclosed prior to acceptance of an order.|Y
01|234799|21|1|A tariff surcharge may be added to this quotation in|N
01|234799|21|2|the event of a sustained tariff increase on the|N
01|234799|21|3|importation of this product.  Any surcharge will be|N
01|234799|21|4|disclosed prior to acceptance of an order.|N
01|234800|1|1|**non-cancellable non-returnable**|Y
01|234800|7|1|**Non-cancellable non-returnable**|Y
01|234800|9|1|A tariff surcharge may be added to this quotation in|Y
01|234800|9|2|the event of a sustained tariff increase on the|Y
01|234800|9|3|importation of this product.  Any surcharge will be|Y
01|234800|9|4|disclosed prior to acceptance of an order.|Y
01|234801|1|1|**Non-cancellable non-returnable**|Y
01|234801|7|1|**non-cancellable non-returnable**|Y
01|234801|9|1|A tariff surcharge may be added to this quotation in|Y
01|234801|9|2|the event of a sustained tariff increase on the|Y
01|234801|9|3|importation of this product.  Any surcharge will be|Y
01|234801|9|4|disclosed prior to acceptance of an order.|Y
01|234802|1|1|RGA#TAR-62042|Y
01|234802|1|2|5AX-201FA-M|Y
01|234802|1|3|SN:4286|Y
01|234802|2|1|CUSTOMER TABLE RETURN|Y
01|234802|2|2|RGA#TAR-62042|Y
01|234802|2|3|5AX-201FA-M SN:4286|Y
01|234802|3|1|A tariff surcharge may be added to this quotation in|Y
01|234802|3|2|the event of a sustained tariff increase on the|Y
01|234802|3|3|importation of this product.  Any surcharge will be|Y
01|234802|3|4|disclosed prior to acceptance of an order.|Y
01|234803|2|1|A tariff surcharge may be added to this quotation in|Y
01|234803|2|2|the event of a sustained tariff increase on the|Y
01|234803|2|3|importation of this product.  Any surcharge will be|Y
01|234803|2|4|disclosed prior to acceptance of an order.|Y
01|234804|2|1|A tariff surcharge may be added to this quotation in|Y
01|234804|2|2|the event of a sustained tariff increase on the|Y
01|234804|2|3|importation of this product.  Any surcharge will be|Y
01|234804|2|4|disclosed prior to acceptance of an order.|Y
01|234805|6|1|A tariff surcharge may be added to this quotation in|Y
01|234805|6|2|the event of a sustained tariff increase on the|Y
01|234805|6|3|importation of this product.  Any surcharge will be|Y
01|234805|6|4|disclosed prior to acceptance of an order.|Y
01|234806|3|1|A tariff surcharge may be added to this quotation in|Y
01|234806|3|2|the event of a sustained tariff increase on the|Y
01|234806|3|3|importation of this product.  Any surcharge will be|Y
01|234806|3|4|disclosed prior to acceptance of an order.|Y
01|234807|6|1|A tariff surcharge may be added to this quotation in|Y
01|234807|6|2|the event of a sustained tariff increase on the|Y
01|234807|6|3|importation of this product.  Any surcharge will be|Y
01|234807|6|4|disclosed prior to acceptance of an order.|Y
01|234808|2|1|A tariff surcharge may be added to this quotation in|Y
01|234808|2|2|the event of a sustained tariff increase on the|Y
01|234808|2|3|importation of this product.  Any surcharge will be|Y
01|234808|2|4|disclosed prior to acceptance of an order.|Y
01|234809|2|1|A tariff surcharge may be added to this quotation in|Y
01|234809|2|2|the event of a sustained tariff increase on the|Y
01|234809|2|3|importation of this product.  Any surcharge will be|Y
01|234809|2|4|disclosed prior to acceptance of an order.|Y
01|234810|3|1|A tariff surcharge may be added to this quotation in|Y
01|234810|3|2|the event of a sustained tariff increase on the|Y
01|234810|3|3|importation of this product.  Any surcharge will be|Y
01|234810|3|4|disclosed prior to acceptance of an order.|Y
01|234811|2|1|A tariff surcharge may be added to this quotation in|Y
01|234811|2|2|the event of a sustained tariff increase on the|Y
01|234811|2|3|importation of this product.  Any surcharge will be|Y
01|234811|2|4|disclosed prior to acceptance of an order.|Y
01|234812|6|1|A tariff surcharge may be added to this quotation in|Y
01|234812|6|2|the event of a sustained tariff increase on the|Y
01|234812|6|3|importation of this product.  Any surcharge will be|Y
01|234812|6|4|disclosed prior to acceptance of an order.|Y
01|234813|2|1|A tariff surcharge may be added to this quotation in|Y
01|234813|2|2|the event of a sustained tariff increase on the|Y
01|234813|2|3|importation of this product.  Any surcharge will be|Y
01|234813|2|4|disclosed prior to acceptance of an order.|Y
01|234814|3|1|A tariff surcharge may be added to this quotation in|Y
01|234814|3|2|the event of a sustained tariff increase on the|Y
01|234814|3|3|importation of this product.  Any surcharge will be|Y
01|234814|3|4|disclosed prior to acceptance of an order.|Y
01|234815|3|1|A tariff surcharge may be added to this quotation in|Y
01|234815|3|2|the event of a sustained tariff increase on the|Y
01|234815|3|3|importation of this product.  Any surcharge will be|Y
01|234815|3|4|disclosed prior to acceptance of an order.|Y
01|234816|11|1|A tariff surcharge may be added to this quotation in|Y
01|234816|11|2|the event of a sustained tariff increase on the|Y
01|234816|11|3|importation of this product.  Any surcharge will be|Y
01|234816|11|4|disclosed prior to acceptance of an order.|Y
01|234817|2|1|A tariff surcharge may be added to this quotation in|Y
01|234817|2|2|the event of a sustained tariff increase on the|Y
01|234817|2|3|importation of this product.  Any surcharge will be|Y
01|234817|2|4|disclosed prior to acceptance of an order.|Y
01|234818|2|1|A tariff surcharge may be added to this quotation in|Y
01|234818|2|2|the event of a sustained tariff increase on the|Y
01|234818|2|3|importation of this product.  Any surcharge will be|Y
01|234818|2|4|disclosed prior to acceptance of an order.|Y
01|234819|1|1|6-PORT ROTARY JOIN BUILT INTO ROTARY TABLE|Y
01|234819|3|1|A tariff surcharge may be added to this quotation in|Y
01|234819|3|2|the event of a sustained tariff increase on the|Y
01|234819|3|3|importation of this product.  Any surcharge will be|Y
01|234819|3|4|disclosed prior to acceptance of an order.|Y
01|234820|1|1|No stock|N
01|234820|2|1|A tariff surcharge may be added to this quotation in|Y
01|234820|2|2|the event of a sustained tariff increase on the|Y
01|234820|2|3|importation of this product.  Any surcharge will be|Y
01|234820|2|4|disclosed prior to acceptance of an order.|Y
01|234821|2|1|A tariff surcharge may be added to this quotation in|Y
01|234821|2|2|the event of a sustained tariff increase on the|Y
01|234821|2|3|importation of this product.  Any surcharge will be|Y
01|234821|2|4|disclosed prior to acceptance of an order.|Y
01|234822|2|1|A tariff surcharge may be added to this quotation in|Y
01|234822|2|2|the event of a sustained tariff increase on the|Y
01|234822|2|3|importation of this product.  Any surcharge will be|Y
01|234822|2|4|disclosed prior to acceptance of an order.|Y
01|234823|4|1|A tariff surcharge may be added to this quotation in|Y
01|234823|4|2|the event of a sustained tariff increase on the|Y
01|234823|4|3|importation of this product.  Any surcharge will be|Y
01|234823|4|4|disclosed prior to acceptance of an order.|Y
01|234826|2|1|A tariff surcharge may be added to this quotation in|Y
01|234826|2|2|the event of a sustained tariff increase on the|Y
01|234826|2|3|importation of this product.  Any surcharge will be|Y
01|234826|2|4|disclosed prior to acceptance of an order.|Y
01|234827|5|1|A tariff surcharge may be added to this quotation in|Y
01|234827|5|2|the event of a sustained tariff increase on the|Y
01|234827|5|3|importation of this product.  Any surcharge will be|Y
01|234827|5|4|disclosed prior to acceptance of an order.|Y
01|234828|1|1|Quantity Breaks:|Y
01|234828|1|2|1-49 pcs: $61.62/EA NET|Y
01|234828|1|3|50-100 pcs: $55.30/EA NET|Y
01|234828|1|4|Good stock of 100+ pcs.|Y
01|234828|3|1|A tariff surcharge may be added to this quotation in|Y
01|234828|3|2|the event of a sustained tariff increase on the|Y
01|234828|3|3|importation of this product.  Any surcharge will be|Y
01|234828|3|4|disclosed prior to acceptance of an order.|Y
01|234830|2|1|A tariff surcharge may be added to this quotation in|Y
01|234830|2|2|the event of a sustained tariff increase on the|Y
01|234830|2|3|importation of this product.  Any surcharge will be|Y
01|234830|2|4|disclosed prior to acceptance of an order.|Y
01|234831|1|1|Pais de Origen: Japon|Y
01|234831|2|1|Pais de Origen: Japon|Y
01|234831|3|1|Pais de Origen: Japon|Y
01|234831|4|1|Pais de Origen: Japon|Y
01|234831|5|1|A tariff surcharge may be added to this quotation in|Y
01|234831|5|2|the event of a sustained tariff increase on the|Y
01|234831|5|3|importation of this product.  Any surcharge will be|Y
01|234831|5|4|disclosed prior to acceptance of an order.|Y
01|234832|3|1|A tariff surcharge may be added to this quotation in|Y
01|234832|3|2|the event of a sustained tariff increase on the|Y
01|234832|3|3|importation of this product.  Any surcharge will be|Y
01|234832|3|4|disclosed prior to acceptance of an order.|Y
01|234833|2|1|A tariff surcharge may be added to this quotation in|Y
01|234833|2|2|the event of a sustained tariff increase on the|Y
01|234833|2|3|importation of this product.  Any surcharge will be|Y
01|234833|2|4|disclosed prior to acceptance of an order.|Y
01|234834|2|1|A tariff surcharge may be added to this quotation in|Y
01|234834|2|2|the event of a sustained tariff increase on the|Y
01|234834|2|3|importation of this product.  Any surcharge will be|Y
01|234834|2|4|disclosed prior to acceptance of an order.|Y
01|234835|8|1|A tariff surcharge of 8% will be added to every order|Y
01|234835|8|2|placed after September 1st 2025(until further notice).|Y
01|234835|8|3|This surcharge will be acknowledged upon acceptance|Y
01|234835|8|4|of every order.|Y
01|234836|4|1|A tariff surcharge may be added to this quotation in|Y
01|234836|4|2|the event of a sustained tariff increase on the|Y
01|234836|4|3|importation of this product.  Any surcharge will be|Y
01|234836|4|4|disclosed prior to acceptance of an order.|Y
01|234837|2|1|A tariff surcharge may be added to this quotation in|Y
01|234837|2|2|the event of a sustained tariff increase on the|Y
01|234837|2|3|importation of this product.  Any surcharge will be|Y
01|234837|2|4|disclosed prior to acceptance of an order.|Y
01|234838|1|1|RGA#TAR-61999|Y
01|234838|1|2|5AX-201FA-M / SN: 1117|Y
01|234838|20|1|A tariff surcharge may be added to this quotation in|Y
01|234838|20|2|the event of a sustained tariff increase on the|Y
01|234838|20|3|importation of this product.  Any surcharge will be|Y
01|234838|20|4|disclosed prior to acceptance of an order.|Y
01|234839|2|1|A tariff surcharge may be added to this quotation in|Y
01|234839|2|2|the event of a sustained tariff increase on the|Y
01|234839|2|3|importation of this product.  Any surcharge will be|Y
01|234839|2|4|disclosed prior to acceptance of an order.|Y
01|234840|2|1|A tariff surcharge may be added to this quotation in|Y
01|234840|2|2|the event of a sustained tariff increase on the|Y
01|234840|2|3|importation of this product.  Any surcharge will be|Y
01|234840|2|4|disclosed prior to acceptance of an order.|Y
01|234841|2|1|A tariff surcharge may be added to this quotation in|Y
01|234841|2|2|the event of a sustained tariff increase on the|Y
01|234841|2|3|importation of this product.  Any surcharge will be|Y
01|234841|2|4|disclosed prior to acceptance of an order.|Y
01|234842|4|1|A tariff surcharge may be added to this quotation in|Y
01|234842|4|2|the event of a sustained tariff increase on the|Y
01|234842|4|3|importation of this product.  Any surcharge will be|Y
01|234842|4|4|disclosed prior to acceptance of an order.|Y
01|234843|2|1|A tariff surcharge may be added to this quotation in|Y
01|234843|2|2|the event of a sustained tariff increase on the|Y
01|234843|2|3|importation of this product.  Any surcharge will be|Y
01|234843|2|4|disclosed prior to acceptance of an order.|Y
01|234844|4|1|A tariff surcharge may be added to this quotation in|Y
01|234844|4|2|the event of a sustained tariff increase on the|Y
01|234844|4|3|importation of this product.  Any surcharge will be|Y
01|234844|4|4|disclosed prior to acceptance of an order.|Y
01|234845|2|1|A tariff surcharge may be added to this quotation in|Y
01|234845|2|2|the event of a sustained tariff increase on the|Y
01|234845|2|3|importation of this product.  Any surcharge will be|Y
01|234845|2|4|disclosed prior to acceptance of an order.|Y
01|234846|7|1|A tariff surcharge may be added to this quotation in|Y
01|234846|7|2|the event of a sustained tariff increase on the|Y
01|234846|7|3|importation of this product.  Any surcharge will be|Y
01|234846|7|4|disclosed prior to acceptance of an order.|Y
01|234847|4|1|A tariff surcharge may be added to this quotation in|Y
01|234847|4|2|the event of a sustained tariff increase on the|Y
01|234847|4|3|importation of this product.  Any surcharge will be|Y
01|234847|4|4|disclosed prior to acceptance of an order.|Y
01|234848|2|1|A tariff surcharge may be added to this quotation in|Y
01|234848|2|2|the event of a sustained tariff increase on the|Y
01|234848|2|3|importation of this product.  Any surcharge will be|Y
01|234848|2|4|disclosed prior to acceptance of an order.|Y
01|234849|3|1|A tariff surcharge may be added to this quotation in|Y
01|234849|3|2|the event of a sustained tariff increase on the|Y
01|234849|3|3|importation of this product.  Any surcharge will be|Y
01|234849|3|4|disclosed prior to acceptance of an order.|Y
01|234850|2|1|A tariff surcharge may be added to this quotation in|Y
01|234850|2|2|the event of a sustained tariff increase on the|Y
01|234850|2|3|importation of this product.  Any surcharge will be|Y
01|234850|2|4|disclosed prior to acceptance of an order.|Y
01|234851|2|1|A tariff surcharge may be added to this quotation in|Y
01|234851|2|2|the event of a sustained tariff increase on the|Y
01|234851|2|3|importation of this product.  Any surcharge will be|Y
01|234851|2|4|disclosed prior to acceptance of an order.|Y
01|234852|4|1|A tariff surcharge may be added to this quotation in|Y
01|234852|4|2|the event of a sustained tariff increase on the|Y
01|234852|4|3|importation of this product.  Any surcharge will be|Y
01|234852|4|4|disclosed prior to acceptance of an order.|Y
01|234853|2|1|TRAVEL HOTEL ETC. Not to exceed $6195.00|Y
01|234853|2|2|Item 2 will be invoiced for actual expenses|Y
01|234853|3|1|TABLE: 5AX-2MT-320-260FA-5+1PRJ|Y
01|234853|3|2|SN: 2243|Y
01|234853|3|3|Replacing worm wheels|Y
01|234853|4|1|TABLE: 5AX-2MT-320-260FA-5+1PRJ|Y
01|234853|4|2|SN: 2242|Y
01|234853|4|3|Replacing worm wheels|Y
01|234853|14|1|A tariff surcharge may be added to this quotation in|Y
01|234853|14|2|the event of a sustained tariff increase on the|Y
01|234853|14|3|importation of this product.  Any surcharge will be|Y
01|234853|14|4|disclosed prior to acceptance of an order.|Y
01|234855|2|1|A tariff surcharge may be added to this quotation in|Y
01|234855|2|2|the event of a sustained tariff increase on the|Y
01|234855|2|3|importation of this product.  Any surcharge will be|Y
01|234855|2|4|disclosed prior to acceptance of an order.|Y
01|234856|2|1|A tariff surcharge may be added to this quotation in|Y
01|234856|2|2|the event of a sustained tariff increase on the|Y
01|234856|2|3|importation of this product.  Any surcharge will be|Y
01|234856|2|4|disclosed prior to acceptance of an order.|Y
01|234857|-13|1|A tariff surcharge may be added to this quotation in|Y
01|234857|-13|2|the event of a sustained tariff increase on the|Y
01|234857|-13|3|importation of this product.  Any surcharge will be|Y
01|234857|-13|4|disclosed prior to acceptance of an order.|Y
01|234858|8|1|A tariff surcharge may be added to this quotation in|Y
01|234858|8|2|the event of a sustained tariff increase on the|Y
01|234858|8|3|importation of this product.  Any surcharge will be|Y
01|234858|8|4|disclosed prior to acceptance of an order.|Y
01|234859|2|1|A tariff surcharge may be added to this quotation in|Y
01|234859|2|2|the event of a sustained tariff increase on the|Y
01|234859|2|3|importation of this product.  Any surcharge will be|Y
01|234859|2|4|disclosed prior to acceptance of an order.|Y
01|234860|2|1|A tariff surcharge may be added to this quotation in|Y
01|234860|2|2|the event of a sustained tariff increase on the|Y
01|234860|2|3|importation of this product.  Any surcharge will be|Y
01|234860|2|4|disclosed prior to acceptance of an order.|Y
01|234861|4|1|Boquilla para 5/32|Y
01|234861|8|1|A tariff surcharge may be added to this quotation in|Y
01|234861|8|2|the event of a sustained tariff increase on the|Y
01|234861|8|3|importation of this product.  Any surcharge will be|Y
01|234861|8|4|disclosed prior to acceptance of an order.|Y
01|234862|2|1|A tariff surcharge may be added to this quotation in|Y
01|234862|2|2|the event of a sustained tariff increase on the|Y
01|234862|2|3|importation of this product.  Any surcharge will be|Y
01|234862|2|4|disclosed prior to acceptance of an order.|Y
01|234863|3|1|A tariff surcharge may be added to this quotation in|Y
01|234863|3|2|the event of a sustained tariff increase on the|Y
01|234863|3|3|importation of this product.  Any surcharge will be|Y
01|234863|3|4|disclosed prior to acceptance of an order.|Y
01|234864|3|1|A tariff surcharge may be added to this quotation in|Y
01|234864|3|2|the event of a sustained tariff increase on the|Y
01|234864|3|3|importation of this product.  Any surcharge will be|Y
01|234864|3|4|disclosed prior to acceptance of an order.|Y
01|234865|9|1|A tariff surcharge may be added to this quotation in|Y
01|234865|9|2|the event of a sustained tariff increase on the|Y
01|234865|9|3|importation of this product.  Any surcharge will be|Y
01|234865|9|4|disclosed prior to acceptance of an order.|Y
01|234866|3|1|A tariff surcharge may be added to this quotation in|Y
01|234866|3|2|the event of a sustained tariff increase on the|Y
01|234866|3|3|importation of this product.  Any surcharge will be|Y
01|234866|3|4|disclosed prior to acceptance of an order.|Y
01|234867|19|1|A tariff surcharge may be added to this quotation in|Y
01|234867|19|2|the event of a sustained tariff increase on the|Y
01|234867|19|3|importation of this product.  Any surcharge will be|Y
01|234867|19|4|disclosed prior to acceptance of an order.|Y
01|234868|9|1|A tariff surcharge may be added to this quotation in|Y
01|234868|9|2|the event of a sustained tariff increase on the|Y
01|234868|9|3|importation of this product.  Any surcharge will be|Y
01|234868|9|4|disclosed prior to acceptance of an order.|Y
01|234869|1|1|We currently have seven (7) in stock the balance of|Y
01|234869|1|2|one (1) estimated lead time would be early/mid October.|Y
01|234869|5|1|A tariff surcharge may be added to this quotation in|Y
01|234869|5|2|the event of a sustained tariff increase on the|Y
01|234869|5|3|importation of this product.  Any surcharge will be|Y
01|234869|5|4|disclosed prior to acceptance of an order.|Y
01|234870|2|1|A tariff surcharge may be added to this quotation in|Y
01|234870|2|2|the event of a sustained tariff increase on the|Y
01|234870|2|3|importation of this product.  Any surcharge will be|Y
01|234870|2|4|disclosed prior to acceptance of an order.|Y
01|234871|13|1|A tariff surcharge may be added to this quotation in|Y
01|234871|13|2|the event of a sustained tariff increase on the|Y
01|234871|13|3|importation of this product.  Any surcharge will be|Y
01|234871|13|4|disclosed prior to acceptance of an order.|Y
01|234872|13|1|A tariff surcharge may be added to this quotation in|Y
01|234872|13|2|the event of a sustained tariff increase on the|Y
01|234872|13|3|importation of this product.  Any surcharge will be|Y
01|234872|13|4|disclosed prior to acceptance of an order.|Y
01|234873|5|1|A tariff surcharge may be added to this quotation in|Y
01|234873|5|2|the event of a sustained tariff increase on the|Y
01|234873|5|3|importation of this product.  Any surcharge will be|Y
01|234873|5|4|disclosed prior to acceptance of an order.|Y
01|234874|3|1|A tariff surcharge may be added to this quotation in|Y
01|234874|3|2|the event of a sustained tariff increase on the|Y
01|234874|3|3|importation of this product.  Any surcharge will be|Y
01|234874|3|4|disclosed prior to acceptance of an order.|Y
01|234875|8|1|A tariff surcharge may be added to this quotation in|Y
01|234875|8|2|the event of a sustained tariff increase on the|Y
01|234875|8|3|importation of this product.  Any surcharge will be|Y
01|234875|8|4|disclosed prior to acceptance of an order.|Y
01|234876|2|1|A tariff surcharge may be added to this quotation in|Y
01|234876|2|2|the event of a sustained tariff increase on the|Y
01|234876|2|3|importation of this product.  Any surcharge will be|Y
01|234876|2|4|disclosed prior to acceptance of an order.|Y
01|234877|1|1|Quoted at NET PRICING|Y
01|234877|1|2|Mimatic# 192541|Y
01|234877|5|1|A tariff surcharge may be added to this quotation in|Y
01|234877|5|2|the event of a sustained tariff increase on the|Y
01|234877|5|3|importation of this product.  Any surcharge will be|Y
01|234877|5|4|disclosed prior to acceptance of an order.|Y
01|234878|1|1|**Non-cancellable non-returnable**|Y
01|234878|7|1|**non-cancellable non-returnable**|Y
01|234878|9|1|A tariff surcharge may be added to this quotation in|Y
01|234878|9|2|the event of a sustained tariff increase on the|Y
01|234878|9|3|importation of this product.  Any surcharge will be|Y
01|234878|9|4|disclosed prior to acceptance of an order.|Y
01|234879|1|1|Pias de Origen: Francia|Y
01|234879|6|1|A tariff surcharge may be added to this quotation in|Y
01|234879|6|2|the event of a sustained tariff increase on the|Y
01|234879|6|3|importation of this product.  Any surcharge will be|Y
01|234879|6|4|disclosed prior to acceptance of an order.|Y
01|234880|2|1|A tariff surcharge may be added to this quotation in|Y
01|234880|2|2|the event of a sustained tariff increase on the|Y
01|234880|2|3|importation of this product.  Any surcharge will be|Y
01|234880|2|4|disclosed prior to acceptance of an order.|Y
01|234881|3|1|A tariff surcharge may be added to this quotation in|Y
01|234881|3|2|the event of a sustained tariff increase on the|Y
01|234881|3|3|importation of this product.  Any surcharge will be|Y
01|234881|3|4|disclosed prior to acceptance of an order.|Y
01|234882|4|1|A tariff surcharge may be added to this quotation in|Y
01|234882|4|2|the event of a sustained tariff increase on the|Y
01|234882|4|3|importation of this product.  Any surcharge will be|Y
01|234882|4|4|disclosed prior to acceptance of an order.|Y
01|234883|5|1|A tariff surcharge may be added to this quotation in|Y
01|234883|5|2|the event of a sustained tariff increase on the|Y
01|234883|5|3|importation of this product.  Any surcharge will be|Y
01|234883|5|4|disclosed prior to acceptance of an order.|Y
01|234884|2|1|A tariff surcharge may be added to this quotation in|Y
01|234884|2|2|the event of a sustained tariff increase on the|Y
01|234884|2|3|importation of this product.  Any surcharge will be|Y
01|234884|2|4|disclosed prior to acceptance of an order.|Y
01|234885|4|1|A tariff surcharge may be added to this quotation in|Y
01|234885|4|2|the event of a sustained tariff increase on the|Y
01|234885|4|3|importation of this product.  Any surcharge will be|Y
01|234885|4|4|disclosed prior to acceptance of an order.|Y
01|234886|1|1|NBT30-UMTX200W|Y
01|234886|2|1|A tariff surcharge may be added to this quotation in|Y
01|234886|2|2|the event of a sustained tariff increase on the|Y
01|234886|2|3|importation of this product.  Any surcharge will be|Y
01|234886|2|4|disclosed prior to acceptance of an order.|Y
01|234887|12|1|A tariff surcharge may be added to this quotation in|Y
01|234887|12|2|the event of a sustained tariff increase on the|Y
01|234887|12|3|importation of this product.  Any surcharge will be|Y
01|234887|12|4|disclosed prior to acceptance of an order.|Y
01|234888|1|1|This item is special non-standard stock.  Once a|Y
01|234888|1|2|Purchase Order has been received it cannot be|Y
01|234888|1|3|cancelled or returned.|Y
01|234888|3|1|A tariff surcharge may be added to this quotation in|Y
01|234888|3|2|the event of a sustained tariff increase on the|Y
01|234888|3|3|importation of this product.  Any surcharge will be|Y
01|234888|3|4|disclosed prior to acceptance of an order.|Y
01|234889|2|1|A tariff surcharge may be added to this quotation in|Y
01|234889|2|2|the event of a sustained tariff increase on the|Y
01|234889|2|3|importation of this product.  Any surcharge will be|Y
01|234889|2|4|disclosed prior to acceptance of an order.|Y
01|234890|2|1|H63A-SF12-120MT|Y
01|234890|3|1|A tariff surcharge may be added to this quotation in|Y
01|234890|3|2|the event of a sustained tariff increase on the|Y
01|234890|3|3|importation of this product.  Any surcharge will be|Y
01|234890|3|4|disclosed prior to acceptance of an order.|Y
01|234891|3|1|A tariff surcharge may be added to this quotation in|Y
01|234891|3|2|the event of a sustained tariff increase on the|Y
01|234891|3|3|importation of this product.  Any surcharge will be|Y
01|234891|3|4|disclosed prior to acceptance of an order.|Y
01|234892|3|1|$1500 List Price Value Tooling Certificate|Y
01|234892|3|2|Free to Ft. Wayne Mold with purchase of above quoted|Y
01|234892|3|3|rotary table and installation.|Y
01|234892|4|1|A tariff surcharge may be added to this quotation in|Y
01|234892|4|2|the event of a sustained tariff increase on the|Y
01|234892|4|3|importation of this product.  Any surcharge will be|Y
01|234892|4|4|disclosed prior to acceptance of an order.|Y
01|234893|1|1|RGA#TAR-62020|Y
01|234893|1|2|5AX-201YA-M SN:3654|Y
01|234893|46|1|TC20x35x4|Y
01|234893|47|1|A tariff surcharge may be added to this quotation in|Y
01|234893|47|2|the event of a sustained tariff increase on the|Y
01|234893|47|3|importation of this product.  Any surcharge will be|Y
01|234893|47|4|disclosed prior to acceptance of an order.|Y
01|234894|2|1|A tariff surcharge may be added to this quotation in|Y
01|234894|2|2|the event of a sustained tariff increase on the|Y
01|234894|2|3|importation of this product.  Any surcharge will be|Y
01|234894|2|4|disclosed prior to acceptance of an order.|Y
01|234895|2|1|A tariff surcharge may be added to this quotation in|Y
01|234895|2|2|the event of a sustained tariff increase on the|Y
01|234895|2|3|importation of this product.  Any surcharge will be|Y
01|234895|2|4|disclosed prior to acceptance of an order.|Y
01|234896|2|1|Please note additional 20% applied per overstock promo.|Y
01|234896|2|2|Once PO/order has been issued these items cannot be|Y
01|234896|2|3|cancelled or returned. These will need to be requoted|Y
01|234896|2|4|on price and availability upon stock depletion.|Y
01|234896|8|1|A tariff surcharge may be added to this quotation in|Y
01|234896|8|2|the event of a sustained tariff increase on the|Y
01|234896|8|3|importation of this product.  Any surcharge will be|Y
01|234896|8|4|disclosed prior to acceptance of an order.|Y
01|234897|6|1|A tariff surcharge may be added to this quotation in|Y
01|234897|6|2|the event of a sustained tariff increase on the|Y
01|234897|6|3|importation of this product.  Any surcharge will be|Y
01|234897|6|4|disclosed prior to acceptance of an order.|Y
01|234898|3|1|A tariff surcharge may be added to this quotation in|Y
01|234898|3|2|the event of a sustained tariff increase on the|Y
01|234898|3|3|importation of this product.  Any surcharge will be|Y
01|234898|3|4|disclosed prior to acceptance of an order.|Y
01|234899|10|1|A tariff surcharge may be added to this quotation in|Y
01|234899|10|2|the event of a sustained tariff increase on the|Y
01|234899|10|3|importation of this product.  Any surcharge will be|Y
01|234899|10|4|disclosed prior to acceptance of an order.|Y
01|234900|3|1|A tariff surcharge may be added to this quotation in|Y
01|234900|3|2|the event of a sustained tariff increase on the|Y
01|234900|3|3|importation of this product.  Any surcharge will be|Y
01|234900|3|4|disclosed prior to acceptance of an order.|Y
01|234901|3|1|A tariff surcharge may be added to this quotation in|Y
01|234901|3|2|the event of a sustained tariff increase on the|Y
01|234901|3|3|importation of this product.  Any surcharge will be|Y
01|234901|3|4|disclosed prior to acceptance of an order.|Y
01|234902|2|1|A tariff surcharge may be added to this quotation in|Y
01|234902|2|2|the event of a sustained tariff increase on the|Y
01|234902|2|3|importation of this product.  Any surcharge will be|Y
01|234902|2|4|disclosed prior to acceptance of an order.|Y
01|234903|2|1|A tariff surcharge may be added to this quotation in|Y
01|234903|2|2|the event of a sustained tariff increase on the|Y
01|234903|2|3|importation of this product.  Any surcharge will be|Y
01|234903|2|4|disclosed prior to acceptance of an order.|Y
01|234904|2|1|A tariff surcharge may be added to this quotation in|Y
01|234904|2|2|the event of a sustained tariff increase on the|Y
01|234904|2|3|importation of this product.  Any surcharge will be|Y
01|234904|2|4|disclosed prior to acceptance of an order.|Y
01|234905|6|1|A tariff surcharge may be added to this quotation in|Y
01|234905|6|2|the event of a sustained tariff increase on the|Y
01|234905|6|3|importation of this product.  Any surcharge will be|Y
01|234905|6|4|disclosed prior to acceptance of an order.|Y
01|234906|8|1|A tariff surcharge may be added to this quotation in|Y
01|234906|8|2|the event of a sustained tariff increase on the|Y
01|234906|8|3|importation of this product.  Any surcharge will be|Y
01|234906|8|4|disclosed prior to acceptance of an order.|Y
01|234907|2|1|A tariff surcharge may be added to this quotation in|Y
01|234907|2|2|the event of a sustained tariff increase on the|Y
01|234907|2|3|importation of this product.  Any surcharge will be|Y
01|234907|2|4|disclosed prior to acceptance of an order.|Y
01|234908|10|1|A tariff surcharge may be added to this quotation in|Y
01|234908|10|2|the event of a sustained tariff increase on the|Y
01|234908|10|3|importation of this product.  Any surcharge will be|Y
01|234908|10|4|disclosed prior to acceptance of an order.|Y
01|234909|3|1|A tariff surcharge may be added to this quotation in|Y
01|234909|3|2|the event of a sustained tariff increase on the|Y
01|234909|3|3|importation of this product.  Any surcharge will be|Y
01|234909|3|4|disclosed prior to acceptance of an order.|Y
01|234910|3|1|A tariff surcharge may be added to this quotation in|Y
01|234910|3|2|the event of a sustained tariff increase on the|Y
01|234910|3|3|importation of this product.  Any surcharge will be|Y
01|234910|3|4|disclosed prior to acceptance of an order.|Y
01|234911|1|1|Mimatic Part#206366|Y
01|234911|1|2|Shank for BMT-Style turret with D=55.4mm/L=102mm|Y
01|234911|1|3|Dihedral-drive with SW=10mm SK20 tooling interface|Y
01|234911|1|4|(tool will be supplied w/o clamping nut)|Y
01|234911|1|5|Internal Coolant through spindle Exterior through pipe|Y
01|234911|1|6|No reversal of rotation direction L1=app. 65mm|Y
01|234911|1|7|Gear Ratio: i(n1/n2)=1:1 Max Coolant Pressure: 70 Bar|Y
01|234911|1|8|Max Torque M (max)=50Nm Max Revolution n1(max)=6500rpm|Y
01|234911|1|9|n2(max)=6500rpm|Y
01|234911|1|10|Minimum Order Quantity: 2 pcs|Y
01|234911|2|1|A tariff surcharge may be added to this quotation in|Y
01|234911|2|2|the event of a sustained tariff increase on the|Y
01|234911|2|3|importation of this product.  Any surcharge will be|Y
01|234911|2|4|disclosed prior to acceptance of an order.|Y
01|234912|9|1|A tariff surcharge may be added to this quotation in|Y
01|234912|9|2|the event of a sustained tariff increase on the|Y
01|234912|9|3|importation of this product.  Any surcharge will be|Y
01|234912|9|4|disclosed prior to acceptance of an order.|Y
01|234913|2|1|A tariff surcharge may be added to this quotation in|Y
01|234913|2|2|the event of a sustained tariff increase on the|Y
01|234913|2|3|importation of this product.  Any surcharge will be|Y
01|234913|2|4|disclosed prior to acceptance of an order.|Y
01|234914|2|1|A tariff surcharge may be added to this quotation in|Y
01|234914|2|2|the event of a sustained tariff increase on the|Y
01|234914|2|3|importation of this product.  Any surcharge will be|Y
01|234914|2|4|disclosed prior to acceptance of an order.|Y
01|234915|4|1|A tariff surcharge may be added to this quotation in|Y
01|234915|4|2|the event of a sustained tariff increase on the|Y
01|234915|4|3|importation of this product.  Any surcharge will be|Y
01|234915|4|4|disclosed prior to acceptance of an order.|Y
01|234916|2|1|A tariff surcharge may be added to this quotation in|Y
01|234916|2|2|the event of a sustained tariff increase on the|Y
01|234916|2|3|importation of this product.  Any surcharge will be|Y
01|234916|2|4|disclosed prior to acceptance of an order.|Y
01|234917|5|1|A tariff surcharge may be added to this quotation in|Y
01|234917|5|2|the event of a sustained tariff increase on the|Y
01|234917|5|3|importation of this product.  Any surcharge will be|Y
01|234917|5|4|disclosed prior to acceptance of an order.|Y
01|234918|3|1|A tariff surcharge may be added to this quotation in|Y
01|234918|3|2|the event of a sustained tariff increase on the|Y
01|234918|3|3|importation of this product.  Any surcharge will be|Y
01|234918|3|4|disclosed prior to acceptance of an order.|Y
01|234919|8|1|A tariff surcharge may be added to this quotation in|Y
01|234919|8|2|the event of a sustained tariff increase on the|Y
01|234919|8|3|importation of this product.  Any surcharge will be|Y
01|234919|8|4|disclosed prior to acceptance of an order.|Y
01|234920|4|1|A tariff surcharge may be added to this quotation in|Y
01|234920|4|2|the event of a sustained tariff increase on the|Y
01|234920|4|3|importation of this product.  Any surcharge will be|Y
01|234920|4|4|disclosed prior to acceptance of an order.|Y
01|234921|1|1|Includes Power and feedback cables from the Nikken|Y
01|234921|1|2|Rotary to the Machine Bulkhead|Y
01|234921|2|1|A tariff surcharge may be added to this quotation in|Y
01|234921|2|2|the event of a sustained tariff increase on the|Y
01|234921|2|3|importation of this product.  Any surcharge will be|Y
01|234921|2|4|disclosed prior to acceptance of an order.|Y
01|234922|2|1|A tariff surcharge may be added to this quotation in|Y
01|234922|2|2|the event of a sustained tariff increase on the|Y
01|234922|2|3|importation of this product.  Any surcharge will be|Y
01|234922|2|4|disclosed prior to acceptance of an order.|Y
01|234923|14|1|A tariff surcharge may be added to this quotation in|Y
01|234923|14|2|the event of a sustained tariff increase on the|Y
01|234923|14|3|importation of this product.  Any surcharge will be|Y
01|234923|14|4|disclosed prior to acceptance of an order.|Y
01|234924|1|1|Quoted at NET price|Y
01|234924|3|1|A tariff surcharge may be added to this quotation in|Y
01|234924|3|2|the event of a sustained tariff increase on the|Y
01|234924|3|3|importation of this product.  Any surcharge will be|Y
01|234924|3|4|disclosed prior to acceptance of an order.|Y
01|234925|4|1|A tariff surcharge may be added to this quotation in|Y
01|234925|4|2|the event of a sustained tariff increase on the|Y
01|234925|4|3|importation of this product.  Any surcharge will be|Y
01|234925|4|4|disclosed prior to acceptance of an order.|Y
01|234926|5|1|A tariff surcharge may be added to this quotation in|Y
01|234926|5|2|the event of a sustained tariff increase on the|Y
01|234926|5|3|importation of this product.  Any surcharge will be|Y
01|234926|5|4|disclosed prior to acceptance of an order.|Y
01|234927|3|1|A tariff surcharge may be added to this quotation in|Y
01|234927|3|2|the event of a sustained tariff increase on the|Y
01|234927|3|3|importation of this product.  Any surcharge will be|Y
01|234927|3|4|disclosed prior to acceptance of an order.|Y
01|234928|2|1|A tariff surcharge may be added to this quotation in|Y
01|234928|2|2|the event of a sustained tariff increase on the|Y
01|234928|2|3|importation of this product.  Any surcharge will be|Y
01|234928|2|4|disclosed prior to acceptance of an order.|Y
01|234929|3|1|A tariff surcharge may be added to this quotation in|Y
01|234929|3|2|the event of a sustained tariff increase on the|Y
01|234929|3|3|importation of this product.  Any surcharge will be|Y
01|234929|3|4|disclosed prior to acceptance of an order.|Y
01|234930|3|1|A tariff surcharge may be added to this quotation in|Y
01|234930|3|2|the event of a sustained tariff increase on the|Y
01|234930|3|3|importation of this product.  Any surcharge will be|Y
01|234930|3|4|disclosed prior to acceptance of an order.|Y
01|234931|1|1|FOR MAKINO SLIM3 VMC - FANUC ALPHA I|Y
01|234931|1|2|NEED FANUC DATA SHEETS AT TIME OF ORDER!!|Y
01|234931|1|3|CONFIRM MAKINO OPTIONS ARE INCLUDED LIKE AXIS EXPANSION|Y
01|234931|3|1|STANDARD INSTALLATION @ IC AUTOMATION|Y
01|234931|4|1|INSTALLATION MUST OCCUR ON SAME TRIP TO RECIEVE|Y
01|234931|4|2|DISCOUNT ON NEXT LINE ITEM|Y
01|234931|5|1|DISCOUNT FOR COMBINING ROTARY TABLE INSTALLATION|Y
01|234931|5|2|ON SAME TRIP AT END USER SITE.|Y
01|234931|5|3|$1137 EA. WILL APPLY TO YOUR FINAL INVOICE AS A CREDIT|Y
01|234931|5|4|NOT TO EXCEED $2274|Y
01|234931|6|1|A tariff surcharge may be added to this quotation in|Y
01|234931|6|2|the event of a sustained tariff increase on the|Y
01|234931|6|3|importation of this product.  Any surcharge will be|Y
01|234931|6|4|disclosed prior to acceptance of an order.|Y
01|234932|2|1|A tariff surcharge may be added to this quotation in|Y
01|234932|2|2|the event of a sustained tariff increase on the|Y
01|234932|2|3|importation of this product.  Any surcharge will be|Y
01|234932|2|4|disclosed prior to acceptance of an order.|Y
01|234933|1|1|RGA#TAR-62036|Y
01|234933|1|2|CNC260FA-M SN: 12913C|Y
01|234933|23|1|A tariff surcharge may be added to this quotation in|Y
01|234933|23|2|the event of a sustained tariff increase on the|Y
01|234933|23|3|importation of this product.  Any surcharge will be|Y
01|234933|23|4|disclosed prior to acceptance of an order.|Y
01|234934|2|1|A tariff surcharge may be added to this quotation in|Y
01|234934|2|2|the event of a sustained tariff increase on the|Y
01|234934|2|3|importation of this product.  Any surcharge will be|Y
01|234934|2|4|disclosed prior to acceptance of an order.|Y
01|234935|1|1|ALPS Part# SAH32-ECH20-70|Y
01|234935|1|2|**Please note this is special non-standard stock. It|Y
01|234935|1|3|cannot be cancelled or returned once PO is placed.**|Y
01|234935|2|1|A tariff surcharge may be added to this quotation in|Y
01|234935|2|2|the event of a sustained tariff increase on the|Y
01|234935|2|3|importation of this product.  Any surcharge will be|Y
01|234935|2|4|disclosed prior to acceptance of an order.|Y
01|234936|5|1|A tariff surcharge may be added to this quotation in|Y
01|234936|5|2|the event of a sustained tariff increase on the|Y
01|234936|5|3|importation of this product.  Any surcharge will be|Y
01|234936|5|4|disclosed prior to acceptance of an order.|Y
01|234937|4|1|A tariff surcharge may be added to this quotation in|Y
01|234937|4|2|the event of a sustained tariff increase on the|Y
01|234937|4|3|importation of this product.  Any surcharge will be|Y
01|234937|4|4|disclosed prior to acceptance of an order.|Y
01|234938|2|1|A tariff surcharge may be added to this quotation in|Y
01|234938|2|2|the event of a sustained tariff increase on the|Y
01|234938|2|3|importation of this product.  Any surcharge will be|Y
01|234938|2|4|disclosed prior to acceptance of an order.|Y
01|234939|11|1|A tariff surcharge may be added to this quotation in|Y
01|234939|11|2|the event of a sustained tariff increase on the|Y
01|234939|11|3|importation of this product.  Any surcharge will be|Y
01|234939|11|4|disclosed prior to acceptance of an order.|Y
01|234940|3|1|A tariff surcharge may be added to this quotation in|Y
01|234940|3|2|the event of a sustained tariff increase on the|Y
01|234940|3|3|importation of this product.  Any surcharge will be|Y
01|234940|3|4|disclosed prior to acceptance of an order.|Y
01|234941|13|1|A tariff surcharge may be added to this quotation in|Y
01|234941|13|2|the event of a sustained tariff increase on the|Y
01|234941|13|3|importation of this product.  Any surcharge will be|Y
01|234941|13|4|disclosed prior to acceptance of an order.|Y
01|234942|2|1|A tariff surcharge may be added to this quotation in|Y
01|234942|2|2|the event of a sustained tariff increase on the|Y
01|234942|2|3|importation of this product.  Any surcharge will be|Y
01|234942|2|4|disclosed prior to acceptance of an order.|Y
01|234943|27|1|Currently one (1) in stock estimated lead time on|Y
01|234943|27|2|balance of one (1) is early/mid August.|Y
01|234943|37|1|A tariff surcharge may be added to this quotation in|Y
01|234943|37|2|the event of a sustained tariff increase on the|Y
01|234943|37|3|importation of this product.  Any surcharge will be|Y
01|234943|37|4|disclosed prior to acceptance of an order.|Y
01|234944|2|1|A tariff surcharge may be added to this quotation in|Y
01|234944|2|2|the event of a sustained tariff increase on the|Y
01|234944|2|3|importation of this product.  Any surcharge will be|Y
01|234944|2|4|disclosed prior to acceptance of an order.|Y
01|234945|3|1|A tariff surcharge may be added to this quotation in|Y
01|234945|3|2|the event of a sustained tariff increase on the|Y
01|234945|3|3|importation of this product.  Any surcharge will be|Y
01|234945|3|4|disclosed prior to acceptance of an order.|Y
01|234946|24|1|A tariff surcharge may be added to this quotation in|Y
01|234946|24|2|the event of a sustained tariff increase on the|Y
01|234946|24|3|importation of this product.  Any surcharge will be|Y
01|234946|24|4|disclosed prior to acceptance of an order.|Y
01|234947|5|1|A tariff surcharge may be added to this quotation in|Y
01|234947|5|2|the event of a sustained tariff increase on the|Y
01|234947|5|3|importation of this product.  Any surcharge will be|Y
01|234947|5|4|disclosed prior to acceptance of an order.|Y
01|234948|3|1|A tariff surcharge may be added to this quotation in|Y
01|234948|3|2|the event of a sustained tariff increase on the|Y
01|234948|3|3|importation of this product.  Any surcharge will be|Y
01|234948|3|4|disclosed prior to acceptance of an order.|Y
01|234949|2|1|A tariff surcharge may be added to this quotation in|Y
01|234949|2|2|the event of a sustained tariff increase on the|Y
01|234949|2|3|importation of this product.  Any surcharge will be|Y
01|234949|2|4|disclosed prior to acceptance of an order.|Y
01|234950|2|1|A tariff surcharge may be added to this quotation in|Y
01|234950|2|2|the event of a sustained tariff increase on the|Y
01|234950|2|3|importation of this product.  Any surcharge will be|Y
01|234950|2|4|disclosed prior to acceptance of an order.|Y
01|234951|2|1|A tariff surcharge may be added to this quotation in|Y
01|234951|2|2|the event of a sustained tariff increase on the|Y
01|234951|2|3|importation of this product.  Any surcharge will be|Y
01|234951|2|4|disclosed prior to acceptance of an order.|Y
01|234952|1|1|Currency:USD|Y
01|234952|2|1|A tariff surcharge may be added to this quotation in|Y
01|234952|2|2|the event of a sustained tariff increase on the|Y
01|234952|2|3|importation of this product.  Any surcharge will be|Y
01|234952|2|4|disclosed prior to acceptance of an order.|Y
01|234953|1|1|**Additional OVERSTOCK discount applied|Y
01|234953|1|2|**Cannot be cancelled or returned|Y
01|234953|2|1|Additional 20% discount applied only to 1 piece|Y
01|234953|2|2|CAT40U-MOL3/4-140|Y
01|234953|3|1|**Special - cannot be cancelled or returned**|Y
01|234953|4|1|DELIVERY: LN to make positioning block ~1 Week after|Y
01|234953|4|2|receipt of necessary spindle measurements|Y
01|234953|5|1|A tariff surcharge may be added to this quotation in|Y
01|234953|5|2|the event of a sustained tariff increase on the|Y
01|234953|5|3|importation of this product.  Any surcharge will be|Y
01|234953|5|4|disclosed prior to acceptance of an order.|Y
01|234954|2|1|A tariff surcharge may be added to this quotation in|Y
01|234954|2|2|the event of a sustained tariff increase on the|Y
01|234954|2|3|importation of this product.  Any surcharge will be|Y
01|234954|2|4|disclosed prior to acceptance of an order.|Y
01|234955|1|1|Quoted at NET price each.|Y
01|234955|2|1|A tariff surcharge may be added to this quotation in|Y
01|234955|2|2|the event of a sustained tariff increase on the|Y
01|234955|2|3|importation of this product.  Any surcharge will be|Y
01|234955|2|4|disclosed prior to acceptance of an order.|Y
01|234956|4|1|A tariff surcharge may be added to this quotation in|Y
01|234956|4|2|the event of a sustained tariff increase on the|Y
01|234956|4|3|importation of this product.  Any surcharge will be|Y
01|234956|4|4|disclosed prior to acceptance of an order.|Y
01|234957|1|1|Ships 1 to 2 weeks ARO|Y
01|234958|6|1|A tariff surcharge may be added to this quotation in|Y
01|234958|6|2|the event of a sustained tariff increase on the|Y
01|234958|6|3|importation of this product.  Any surcharge will be|Y
01|234958|6|4|disclosed prior to acceptance of an order.|Y
01|234959|2|1|A tariff surcharge may be added to this quotation in|Y
01|234959|2|2|the event of a sustained tariff increase on the|Y
01|234959|2|3|importation of this product.  Any surcharge will be|Y
01|234959|2|4|disclosed prior to acceptance of an order.|Y
01|234960|2|1|A tariff surcharge may be added to this quotation in|Y
01|234960|2|2|the event of a sustained tariff increase on the|Y
01|234960|2|3|importation of this product.  Any surcharge will be|Y
01|234960|2|4|disclosed prior to acceptance of an order.|Y
01|234961|2|1|A tariff surcharge may be added to this quotation in|Y
01|234961|2|2|the event of a sustained tariff increase on the|Y
01|234961|2|3|importation of this product.  Any surcharge will be|Y
01|234961|2|4|disclosed prior to acceptance of an order.|Y
01|234962|4|1|A tariff surcharge may be added to this quotation in|Y
01|234962|4|2|the event of a sustained tariff increase on the|Y
01|234962|4|3|importation of this product.  Any surcharge will be|Y
01|234962|4|4|disclosed prior to acceptance of an order.|Y
01|234963|2|1|A tariff surcharge may be added to this quotation in|Y
01|234963|2|2|the event of a sustained tariff increase on the|Y
01|234963|2|3|importation of this product.  Any surcharge will be|Y
01|234963|2|4|disclosed prior to acceptance of an order.|Y
01|234964|2|1|A tariff surcharge may be added to this quotation in|Y
01|234964|2|2|the event of a sustained tariff increase on the|Y
01|234964|2|3|importation of this product.  Any surcharge will be|Y
01|234964|2|4|disclosed prior to acceptance of an order.|Y
01|234965|2|1|A tariff surcharge may be added to this quotation in|Y
01|234965|2|2|the event of a sustained tariff increase on the|Y
01|234965|2|3|importation of this product.  Any surcharge will be|Y
01|234965|2|4|disclosed prior to acceptance of an order.|Y
01|234966|4|1|A tariff surcharge may be added to this quotation in|Y
01|234966|4|2|the event of a sustained tariff increase on the|Y
01|234966|4|3|importation of this product.  Any surcharge will be|Y
01|234966|4|4|disclosed prior to acceptance of an order.|Y
01|234967|16|1|A tariff surcharge may be added to this quotation in|Y
01|234967|16|2|the event of a sustained tariff increase on the|Y
01|234967|16|3|importation of this product.  Any surcharge will be|Y
01|234967|16|4|disclosed prior to acceptance of an order.|Y
01|234968|8|1|A tariff surcharge may be added to this quotation in|Y
01|234968|8|2|the event of a sustained tariff increase on the|Y
01|234968|8|3|importation of this product.  Any surcharge will be|Y
01|234968|8|4|disclosed prior to acceptance of an order.|Y
01|234969|4|1|A tariff surcharge may be added to this quotation in|Y
01|234969|4|2|the event of a sustained tariff increase on the|Y
01|234969|4|3|importation of this product.  Any surcharge will be|Y
01|234969|4|4|disclosed prior to acceptance of an order.|Y
01|234970|2|1|A tariff surcharge may be added to this quotation in|Y
01|234970|2|2|the event of a sustained tariff increase on the|Y
01|234970|2|3|importation of this product.  Any surcharge will be|Y
01|234970|2|4|disclosed prior to acceptance of an order.|Y
01|234971|2|1|A tariff surcharge may be added to this quotation in|Y
01|234971|2|2|the event of a sustained tariff increase on the|Y
01|234971|2|3|importation of this product.  Any surcharge will be|Y
01|234971|2|4|disclosed prior to acceptance of an order.|Y
01|234972|20|1|DELIVERY: 1pc STOCK 6pc 4Wks Balance 12-13 Wks|Y
01|234972|60|1|A tariff surcharge may be added to this quotation in|Y
01|234972|60|2|the event of a sustained tariff increase on the|Y
01|234972|60|3|importation of this product.  Any surcharge will be|Y
01|234972|60|4|disclosed prior to acceptance of an order.|Y
01|234973|3|1|A tariff surcharge may be added to this quotation in|Y
01|234973|3|2|the event of a sustained tariff increase on the|Y
01|234973|3|3|importation of this product.  Any surcharge will be|Y
01|234973|3|4|disclosed prior to acceptance of an order.|Y
01|234975|2|1|A tariff surcharge may be added to this quotation in|Y
01|234975|2|2|the event of a sustained tariff increase on the|Y
01|234975|2|3|importation of this product.  Any surcharge will be|Y
01|234975|2|4|disclosed prior to acceptance of an order.|Y
01|234976|2|1|A tariff surcharge may be added to this quotation in|Y
01|234976|2|2|the event of a sustained tariff increase on the|Y
01|234976|2|3|importation of this product.  Any surcharge will be|Y
01|234976|2|4|disclosed prior to acceptance of an order.|Y
01|234977|3|1|A tariff surcharge may be added to this quotation in|Y
01|234977|3|2|the event of a sustained tariff increase on the|Y
01|234977|3|3|importation of this product.  Any surcharge will be|Y
01|234977|3|4|disclosed prior to acceptance of an order.|Y
01|234978|4|1|A tariff surcharge may be added to this quotation in|Y
01|234978|4|2|the event of a sustained tariff increase on the|Y
01|234978|4|3|importation of this product.  Any surcharge will be|Y
01|234978|4|4|disclosed prior to acceptance of an order.|Y
01|234979|2|1|A tariff surcharge may be added to this quotation in|Y
01|234979|2|2|the event of a sustained tariff increase on the|Y
01|234979|2|3|importation of this product.  Any surcharge will be|Y
01|234979|2|4|disclosed prior to acceptance of an order.|Y
01|234981|1|1|w/ PS-123-AIR installed at factory|Y
01|234981|2|1|Installed on NC5-46-TB40-200 at factory|Y
01|234981|8|1|A tariff surcharge may be added to this quotation in|Y
01|234981|8|2|the event of a sustained tariff increase on the|Y
01|234981|8|3|the event of a sustained tariff increase on the|Y
01|234981|8|4|importation of this product.  Any surcharge will be|Y
01|234981|8|5|disclosed prior to acceptance of an order.|Y
01|234982|2|1|A tariff surcharge may be added to this quotation in|Y
01|234982|2|2|the event of a sustained tariff increase on the|Y
01|234982|2|3|importation of this product.  Any surcharge will be|Y
01|234982|2|4|disclosed prior to acceptance of an order.|Y
01|234983|2|1|A tariff surcharge may be added to this quotation in|Y
01|234983|2|2|the event of a sustained tariff increase on the|Y
01|234983|2|3|importation of this product.  Any surcharge will be|Y
01|234983|2|4|disclosed prior to acceptance of an order.|Y
01|234984|2|1|A tariff surcharge may be added to this quotation in|Y
01|234984|2|2|the event of a sustained tariff increase on the|Y
01|234984|2|3|importation of this product.  Any surcharge will be|Y
01|234984|2|4|disclosed prior to acceptance of an order.|Y
01|234985|3|1|A tariff surcharge may be added to this quotation in|Y
01|234985|3|2|the event of a sustained tariff increase on the|Y
01|234985|3|3|importation of this product.  Any surcharge will be|Y
01|234985|3|4|disclosed prior to acceptance of an order.|Y
01|234986|3|1|A tariff surcharge may be added to this quotation in|Y
01|234986|3|2|the event of a sustained tariff increase on the|Y
01|234986|3|3|importation of this product.  Any surcharge will be|Y
01|234986|3|4|disclosed prior to acceptance of an order.|Y
01|234987|2|1|A tariff surcharge may be added to this quotation in|Y
01|234987|2|2|the event of a sustained tariff increase on the|Y
01|234987|2|3|importation of this product.  Any surcharge will be|Y
01|234987|2|4|disclosed prior to acceptance of an order.|Y
01|234988|2|1|A tariff surcharge may be added to this quotation in|Y
01|234988|2|2|the event of a sustained tariff increase on the|Y
01|234988|2|3|importation of this product.  Any surcharge will be|Y
01|234988|2|4|disclosed prior to acceptance of an order.|Y
01|234989|2|1|A tariff surcharge may be added to this quotation in|Y
01|234989|2|2|the event of a sustained tariff increase on the|Y
01|234989|2|3|importation of this product.  Any surcharge will be|Y
01|234989|2|4|disclosed prior to acceptance of an order.|Y
01|234990|1|1|Note: Order must be received by 8/1 for Mid Aug Delvy|Y
01|234990|2|1|A tariff surcharge may be added to this quotation in|Y
01|234990|2|2|the event of a sustained tariff increase on the|Y
01|234990|2|3|importation of this product.  Any surcharge will be|Y
01|234990|2|4|disclosed prior to acceptance of an order.|Y
01|234991|2|1|A tariff surcharge may be added to this quotation in|Y
01|234991|2|2|the event of a sustained tariff increase on the|Y
01|234991|2|3|importation of this product.  Any surcharge will be|Y
01|234991|2|4|disclosed prior to acceptance of an order.|Y
01|234992|32|1|A tariff surcharge may be added to this quotation in|Y
01|234992|32|2|the event of a sustained tariff increase on the|Y
01|234992|32|3|importation of this product.  Any surcharge will be|Y
01|234992|32|4|disclosed prior to acceptance of an order.|Y
01|234993|3|1|A tariff surcharge may be added to this quotation in|Y
01|234993|3|2|the event of a sustained tariff increase on the|Y
01|234993|3|3|importation of this product.  Any surcharge will be|Y
01|234993|3|4|disclosed prior to acceptance of an order.|Y
01|234994|1|1|ZeroClamp SP Clamping Base for Variaxis i800 Mazak|Y
01|234994|1|2|Base size 500mm x 500mm Pod ZP 120 x 8pcs.|Y
01|234994|1|3|SP Order Item. NET Price Each. Cancellations cannot be|Y
01|234994|1|4|accepted once the order has been received.|Y
01|234994|1|5|Price based on MOQ of 20 units.|Y
01|234994|1|6|Delivery: 10weeks Mfg. + Shipping (Boat 6-8weeks)|Y
01|234994|1|7|Air freight is also available as an option. Please NOTE|Y
01|234994|1|8|that an additional surcharge will be applied.|Y
01|234994|11|1|A tariff surcharge may be added to this quotation in|Y
01|234994|11|2|the event of a sustained tariff increase on the|Y
01|234994|11|3|importation of this product.  Any surcharge will be|Y
01|234994|11|4|disclosed prior to acceptance of an order.|Y
01|234995|2|1|A tariff surcharge may be added to this quotation in|Y
01|234995|2|2|the event of a sustained tariff increase on the|Y
01|234995|2|3|importation of this product.  Any surcharge will be|Y
01|234995|2|4|disclosed prior to acceptance of an order.|Y
01|234996|2|1|A tariff surcharge may be added to this quotation in|Y
01|234996|2|2|the event of a sustained tariff increase on the|Y
01|234996|2|3|importation of this product.  Any surcharge will be|Y
01|234996|2|4|disclosed prior to acceptance of an order.|Y
01|234997|2|1|A tariff surcharge may be added to this quotation in|Y
01|234997|2|2|the event of a sustained tariff increase on the|Y
01|234997|2|3|importation of this product.  Any surcharge will be|Y
01|234997|2|4|disclosed prior to acceptance of an order.|Y
01|234998|2|1|A tariff surcharge of 8% will be added to every order|Y
01|234998|2|2|placed after September 1st 2025(until further notice).|Y
01|234998|2|3|This surcharge will be acknowledged upon acceptance|Y
01|234998|2|4|of every order.|Y
01|234999|2|1|A tariff surcharge may be added to this quotation in|Y
01|234999|2|2|the event of a sustained tariff increase on the|Y
01|234999|2|3|importation of this product.  Any surcharge will be|Y
01|234999|2|4|disclosed prior to acceptance of an order.|Y
01|235000|2|1|A tariff surcharge may be added to this quotation in|Y
01|235000|2|2|the event of a sustained tariff increase on the|Y
01|235000|2|3|importation of this product.  Any surcharge will be|Y
01|235000|2|4|disclosed prior to acceptance of an order.|Y
01|235001|4|1|A tariff surcharge may be added to this quotation in|Y
01|235001|4|2|the event of a sustained tariff increase on the|Y
01|235001|4|3|importation of this product.  Any surcharge will be|Y
01|235001|4|4|disclosed prior to acceptance of an order.|Y
01|235002|4|1|Part Number: NBT50-FMC22-105|Y
01|235002|4|2|NBT50 DualContact Shell Mill Holder 22mm Coolant Ports|Y
01|235002|5|1|Part Number: NBT50-FMH22-47-105|Y
01|235002|5|2|NBT50 DualContact Shell Mill Holder 22mm CoolantPorts|Y
01|235002|32|1|A tariff surcharge may be added to this quotation in|Y
01|235002|32|2|the event of a sustained tariff increase on the|Y
01|235002|32|3|importation of this product.  Any surcharge will be|Y
01|235002|32|4|disclosed prior to acceptance of an order.|Y
01|235003|2|1|A tariff surcharge may be added to this quotation in|Y
01|235003|2|2|the event of a sustained tariff increase on the|Y
01|235003|2|3|importation of this product.  Any surcharge will be|Y
01|235003|2|4|disclosed prior to acceptance of an order.|Y
01|235004|4|1|Part Number: NBT50-FMC22-105|Y
01|235004|4|2|NBT50 DualContact Shell Mill Holder 22mm Coolant Ports|Y
01|235004|5|1|Part Number: NBT50-FMH22-47-105|Y
01|235004|5|2|NBT50 DualContact Shell Mill Holder 22mm CoolantPorts|Y
01|235004|34|1|A tariff surcharge may be added to this quotation in|Y
01|235004|34|2|the event of a sustained tariff increase on the|Y
01|235004|34|3|importation of this product.  Any surcharge will be|Y
01|235004|34|4|disclosed prior to acceptance of an order.|Y
01|235005|3|1|A tariff surcharge may be added to this quotation in|Y
01|235005|3|2|the event of a sustained tariff increase on the|Y
01|235005|3|3|importation of this product.  Any surcharge will be|Y
01|235005|3|4|disclosed prior to acceptance of an order.|Y
01|235006|4|1|A tariff surcharge may be added to this quotation in|Y
01|235006|4|2|the event of a sustained tariff increase on the|Y
01|235006|4|3|importation of this product.  Any surcharge will be|Y
01|235006|4|4|disclosed prior to acceptance of an order.|Y
01|235007|6|1|A tariff surcharge may be added to this quotation in|Y
01|235007|6|2|the event of a sustained tariff increase on the|Y
01|235007|6|3|importation of this product.  Any surcharge will be|Y
01|235007|6|4|disclosed prior to acceptance of an order.|Y
01|235008|2|1|A tariff surcharge may be added to this quotation in|Y
01|235008|2|2|the event of a sustained tariff increase on the|Y
01|235008|2|3|importation of this product.  Any surcharge will be|Y
01|235008|2|4|disclosed prior to acceptance of an order.|Y
01|235009|8|1|A tariff surcharge may be added to this quotation in|Y
01|235009|8|2|the event of a sustained tariff increase on the|Y
01|235009|8|3|importation of this product.  Any surcharge will be|Y
01|235009|8|4|disclosed prior to acceptance of an order.|Y
01|235010|1|1|CAT40-HC12-3.15|Y
01|235010|-13|1|A tariff surcharge may be added to this quotation in|Y
01|235010|-13|2|the event of a sustained tariff increase on the|Y
01|235010|-13|3|importation of this product.  Any surcharge will be|Y
01|235010|-13|4|disclosed prior to acceptance of an order.|Y
01|235011|2|1|A tariff surcharge may be added to this quotation in|Y
01|235011|2|2|the event of a sustained tariff increase on the|Y
01|235011|2|3|importation of this product.  Any surcharge will be|Y
01|235011|2|4|disclosed prior to acceptance of an order.|Y
01|235012|13|1|A tariff surcharge may be added to this quotation in|Y
01|235012|13|2|the event of a sustained tariff increase on the|Y
01|235012|13|3|importation of this product.  Any surcharge will be|Y
01|235012|13|4|disclosed prior to acceptance of an order.|Y
01|235013|2|1|A tariff surcharge may be added to this quotation in|Y
01|235013|2|2|the event of a sustained tariff increase on the|Y
01|235013|2|3|importation of this product.  Any surcharge will be|Y
01|235013|2|4|disclosed prior to acceptance of an order.|Y
01|235014|2|1|A tariff surcharge may be added to this quotation in|Y
01|235014|2|2|the event of a sustained tariff increase on the|Y
01|235014|2|3|importation of this product.  Any surcharge will be|Y
01|235014|2|4|disclosed prior to acceptance of an order.|Y
01|235015|4|1|SKN-6WKJ(GH) replaces  SKN-6WBJ(GH).|Y
01|235015|6|1|A tariff surcharge may be added to this quotation in|Y
01|235015|6|2|the event of a sustained tariff increase on the|Y
01|235015|6|3|importation of this product.  Any surcharge will be|Y
01|235015|6|4|disclosed prior to acceptance of an order.|Y
01|235016|9|1|A tariff surcharge may be added to this quotation in|Y
01|235016|9|2|the event of a sustained tariff increase on the|Y
01|235016|9|3|importation of this product.  Any surcharge will be|Y
01|235016|9|4|disclosed prior to acceptance of an order.|Y
01|235017|2|1|A tariff surcharge may be added to this quotation in|Y
01|235017|2|2|the event of a sustained tariff increase on the|Y
01|235017|2|3|importation of this product.  Any surcharge will be|Y
01|235017|2|4|disclosed prior to acceptance of an order.|Y
01|235018|2|1|A tariff surcharge may be added to this quotation in|Y
01|235018|2|2|the event of a sustained tariff increase on the|Y
01|235018|2|3|importation of this product.  Any surcharge will be|Y
01|235018|2|4|disclosed prior to acceptance of an order.|Y
01|235019|2|1|A tariff surcharge may be added to this quotation in|Y
01|235019|2|2|the event of a sustained tariff increase on the|Y
01|235019|2|3|importation of this product.  Any surcharge will be|Y
01|235019|2|4|disclosed prior to acceptance of an order.|Y
01|235020|2|1|A tariff surcharge may be added to this quotation in|Y
01|235020|2|2|the event of a sustained tariff increase on the|Y
01|235020|2|3|importation of this product.  Any surcharge will be|Y
01|235020|2|4|disclosed prior to acceptance of an order.|Y
01|235021|22|1|A tariff surcharge may be added to this quotation in|Y
01|235021|22|2|the event of a sustained tariff increase on the|Y
01|235021|22|3|importation of this product.  Any surcharge will be|Y
01|235021|22|4|disclosed prior to acceptance of an order.|Y
01|235022|5|1|A tariff surcharge may be added to this quotation in|Y
01|235022|5|2|the event of a sustained tariff increase on the|Y
01|235022|5|3|importation of this product.  Any surcharge will be|Y
01|235022|5|4|disclosed prior to acceptance of an order.|Y
01|235023|7|1|BT50-FMC22-150|Y
01|235023|8|1|BT50-FMC22-250|Y
01|235023|18|1|BT50-SK20-165|Y
01|235023|53|1|A tariff surcharge may be added to this quotation in|Y
01|235023|53|2|the event of a sustained tariff increase on the|Y
01|235023|53|3|importation of this product.  Any surcharge will be|Y
01|235023|53|4|disclosed prior to acceptance of an order.|Y
01|235024|1|1|Placeholder for NCAT40U-NX5-153 NCAT40 NX5 spindle|Y
01|235024|1|2|speeder. Please allow 3 months manufacturing & delivery|Y
01|235024|1|3|time. This has been quoted at a special net price and|Y
01|235024|1|4|once PO/order has been issued these can't be cancelled|Y
01|235024|1|5|or returned.|Y
01|235024|9|1|A tariff surcharge may be added to this quotation in|Y
01|235024|9|2|the event of a sustained tariff increase on the|Y
01|235024|9|3|importation of this product.  Any surcharge will be|Y
01|235024|9|4|disclosed prior to acceptance of an order.|Y
01|235026|12|1|A tariff surcharge may be added to this quotation in|Y
01|235026|12|2|the event of a sustained tariff increase on the|Y
01|235026|12|3|importation of this product.  Any surcharge will be|Y
01|235026|12|4|disclosed prior to acceptance of an order.|Y
01|235027|5|1|A tariff surcharge may be added to this quotation in|Y
01|235027|5|2|the event of a sustained tariff increase on the|Y
01|235027|5|3|importation of this product.  Any surcharge will be|Y
01|235027|5|4|disclosed prior to acceptance of an order.|Y
01|235028|2|1|A tariff surcharge may be added to this quotation in|Y
01|235028|2|2|the event of a sustained tariff increase on the|Y
01|235028|2|3|importation of this product.  Any surcharge will be|Y
01|235028|2|4|disclosed prior to acceptance of an order.|Y
01|235031|2|1|A tariff surcharge may be added to this quotation in|Y
01|235031|2|2|the event of a sustained tariff increase on the|Y
01|235031|2|3|importation of this product.  Any surcharge will be|Y
01|235031|2|4|disclosed prior to acceptance of an order.|Y
01|235032|5|1|A tariff surcharge may be added to this quotation in|Y
01|235032|5|2|the event of a sustained tariff increase on the|Y
01|235032|5|3|importation of this product.  Any surcharge will be|Y
01|235032|5|4|disclosed prior to acceptance of an order.|Y
01|235033|2|1|A tariff surcharge may be added to this quotation in|Y
01|235033|2|2|the event of a sustained tariff increase on the|Y
01|235033|2|3|importation of this product.  Any surcharge will be|Y
01|235033|2|4|disclosed prior to acceptance of an order.|Y
01|235034|3|1|A tariff surcharge may be added to this quotation in|Y
01|235034|3|2|the event of a sustained tariff increase on the|Y
01|235034|3|3|importation of this product.  Any surcharge will be|Y
01|235034|3|4|disclosed prior to acceptance of an order.|Y
01|235035|2|1|A tariff surcharge may be added to this quotation in|Y
01|235035|2|2|the event of a sustained tariff increase on the|Y
01|235035|2|3|importation of this product.  Any surcharge will be|Y
01|235035|2|4|disclosed prior to acceptance of an order.|Y
01|235036|2|1|A tariff surcharge may be added to this quotation in|Y
01|235036|2|2|the event of a sustained tariff increase on the|Y
01|235036|2|3|importation of this product.  Any surcharge will be|Y
01|235036|2|4|disclosed prior to acceptance of an order.|Y
01|235037|3|1|A tariff surcharge may be added to this quotation in|Y
01|235037|3|2|the event of a sustained tariff increase on the|Y
01|235037|3|3|importation of this product.  Any surcharge will be|Y
01|235037|3|4|disclosed prior to acceptance of an order.|Y
01|235038|2|1|A tariff surcharge may be added to this quotation in|Y
01|235038|2|2|the event of a sustained tariff increase on the|Y
01|235038|2|3|importation of this product.  Any surcharge will be|Y
01|235038|2|4|disclosed prior to acceptance of an order.|Y
01|235039|2|1|A tariff surcharge may be added to this quotation in|Y
01|235039|2|2|the event of a sustained tariff increase on the|Y
01|235039|2|3|importation of this product.  Any surcharge will be|Y
01|235039|2|4|disclosed prior to acceptance of an order.|Y
01|235040|5|1|A tariff surcharge may be added to this quotation in|Y
01|235040|5|2|the event of a sustained tariff increase on the|Y
01|235040|5|3|importation of this product.  Any surcharge will be|Y
01|235040|5|4|disclosed prior to acceptance of an order.|Y
01|235041|3|1|A tariff surcharge may be added to this quotation in|Y
01|235041|3|2|the event of a sustained tariff increase on the|Y
01|235041|3|3|importation of this product.  Any surcharge will be|Y
01|235041|3|4|disclosed prior to acceptance of an order.|Y
01|235042|2|1|A tariff surcharge may be added to this quotation in|Y
01|235042|2|2|the event of a sustained tariff increase on the|Y
01|235042|2|3|importation of this product.  Any surcharge will be|Y
01|235042|2|4|disclosed prior to acceptance of an order.|Y
01|235043|2|1|A tariff surcharge may be added to this quotation in|Y
01|235043|2|2|the event of a sustained tariff increase on the|Y
01|235043|2|3|importation of this product.  Any surcharge will be|Y
01|235043|2|4|disclosed prior to acceptance of an order.|Y
01|235044|5|1|A tariff surcharge may be added to this quotation in|Y
01|235044|5|2|the event of a sustained tariff increase on the|Y
01|235044|5|3|importation of this product.  Any surcharge will be|Y
01|235044|5|4|disclosed prior to acceptance of an order.|Y
01|235045|2|1|A tariff surcharge may be added to this quotation in|Y
01|235045|2|2|the event of a sustained tariff increase on the|Y
01|235045|2|3|importation of this product.  Any surcharge will be|Y
01|235045|2|4|disclosed prior to acceptance of an order.|Y
01|235046|2|1|A tariff surcharge may be added to this quotation in|Y
01|235046|2|2|the event of a sustained tariff increase on the|Y
01|235046|2|3|importation of this product.  Any surcharge will be|Y
01|235046|2|4|disclosed prior to acceptance of an order.|Y
01|235047|2|1|A tariff surcharge may be added to this quotation in|Y
01|235047|2|2|the event of a sustained tariff increase on the|Y
01|235047|2|3|importation of this product.  Any surcharge will be|Y
01|235047|2|4|disclosed prior to acceptance of an order.|Y
01|235049|2|1|A tariff surcharge may be added to this quotation in|Y
01|235049|2|2|the event of a sustained tariff increase on the|Y
01|235049|2|3|importation of this product.  Any surcharge will be|Y
01|235049|2|4|disclosed prior to acceptance of an order.|Y
01|235050|1|1|RGA#LVR-61840/|Y
01|235050|1|2|Repair of MZQT47-ER32Z-MS s/n: 41141 03|Y
01|235050|1|3|(Mimatic#124638)|Y
01|235050|2|1|Bearings seals and o-rings to be replaced.|Y
01|235050|3|1|A tariff surcharge may be added to this quotation in|Y
01|235050|3|2|the event of a sustained tariff increase on the|Y
01|235050|3|3|importation of this product.  Any surcharge will be|Y
01|235050|3|4|disclosed prior to acceptance of an order.|Y
01|235051|5|1|A tariff surcharge may be added to this quotation in|Y
01|235051|5|2|the event of a sustained tariff increase on the|Y
01|235051|5|3|importation of this product.  Any surcharge will be|Y
01|235051|5|4|disclosed prior to acceptance of an order.|Y
01|235052|2|1|A tariff surcharge may be added to this quotation in|Y
01|235052|2|2|the event of a sustained tariff increase on the|Y
01|235052|2|3|importation of this product.  Any surcharge will be|Y
01|235052|2|4|disclosed prior to acceptance of an order.|Y
01|235053|2|1|A tariff surcharge may be added to this quotation in|Y
01|235053|2|2|the event of a sustained tariff increase on the|Y
01|235053|2|3|importation of this product.  Any surcharge will be|Y
01|235053|2|4|disclosed prior to acceptance of an order.|Y
01|235054|7|1|A tariff surcharge may be added to this quotation in|Y
01|235054|7|2|the event of a sustained tariff increase on the|Y
01|235054|7|3|importation of this product.  Any surcharge will be|Y
01|235054|7|4|disclosed prior to acceptance of an order.|Y
01|235055|2|1|A tariff surcharge may be added to this quotation in|Y
01|235055|2|2|the event of a sustained tariff increase on the|Y
01|235055|2|3|importation of this product.  Any surcharge will be|Y
01|235055|2|4|disclosed prior to acceptance of an order.|Y
01|235056|2|1|A tariff surcharge may be added to this quotation in|Y
01|235056|2|2|the event of a sustained tariff increase on the|Y
01|235056|2|3|importation of this product.  Any surcharge will be|Y
01|235056|2|4|disclosed prior to acceptance of an order.|Y
01|235057|1|1|2-pcs stock|Y
01|235058|2|1|A tariff surcharge may be added to this quotation in|Y
01|235058|2|2|the event of a sustained tariff increase on the|Y
01|235058|2|3|importation of this product.  Any surcharge will be|Y
01|235058|2|4|disclosed prior to acceptance of an order.|Y
01|235059|2|1|A tariff surcharge may be added to this quotation in|Y
01|235059|2|2|the event of a sustained tariff increase on the|Y
01|235059|2|3|importation of this product.  Any surcharge will be|Y
01|235059|2|4|disclosed prior to acceptance of an order.|Y
01|235060|9|1|A tariff surcharge may be added to this quotation in|Y
01|235060|9|2|the event of a sustained tariff increase on the|Y
01|235060|9|3|importation of this product.  Any surcharge will be|Y
01|235060|9|4|disclosed prior to acceptance of an order.|Y
01|235061|1|1|Crossover for MT Item #: MNZ0580220|Y
01|235061|1|2|Adjustable Angle Driven Tool +/- 90 Degree|Y
01|235061|1|3|12000 RPM H=50mm|Y
01|235061|1|4|DMG Mori NZX1500 16 position turret BMT40 interface|Y
01|235061|1|5|per Garret at AFI.|Y
01|235061|1|9|c|N
01|235061|20|1|A tariff surcharge may be added to this quotation in|Y
01|235061|20|2|the event of a sustained tariff increase on the|Y
01|235061|20|3|importation of this product.  Any surcharge will be|Y
01|235061|20|4|disclosed prior to acceptance of an order.|Y
01|235062|2|1|A tariff surcharge may be added to this quotation in|Y
01|235062|2|2|the event of a sustained tariff increase on the|Y
01|235062|2|3|importation of this product.  Any surcharge will be|Y
01|235062|2|4|disclosed prior to acceptance of an order.|Y
01|235063|2|1|A tariff surcharge may be added to this quotation in|Y
01|235063|2|2|the event of a sustained tariff increase on the|Y
01|235063|2|3|importation of this product.  Any surcharge will be|Y
01|235063|2|4|disclosed prior to acceptance of an order.|Y
01|235064|2|1|A tariff surcharge may be added to this quotation in|Y
01|235064|2|2|the event of a sustained tariff increase on the|Y
01|235064|2|3|importation of this product.  Any surcharge will be|Y
01|235064|2|4|disclosed prior to acceptance of an order.|Y
01|235065|2|1|A tariff surcharge may be added to this quotation in|Y
01|235065|2|2|the event of a sustained tariff increase on the|Y
01|235065|2|3|importation of this product.  Any surcharge will be|Y
01|235065|2|4|disclosed prior to acceptance of an order.|Y
01|235066|2|1|A tariff surcharge may be added to this quotation in|Y
01|235066|2|2|the event of a sustained tariff increase on the|Y
01|235066|2|3|importation of this product.  Any surcharge will be|Y
01|235066|2|4|disclosed prior to acceptance of an order.|Y
01|235067|3|1|A tariff surcharge may be added to this quotation in|Y
01|235067|3|2|the event of a sustained tariff increase on the|Y
01|235067|3|3|importation of this product.  Any surcharge will be|Y
01|235067|3|4|disclosed prior to acceptance of an order.|Y
01|235068|2|1|A tariff surcharge may be added to this quotation in|Y
01|235068|2|2|the event of a sustained tariff increase on the|Y
01|235068|2|3|importation of this product.  Any surcharge will be|Y
01|235068|2|4|disclosed prior to acceptance of an order.|Y
01|235069|2|1|A tariff surcharge may be added to this quotation in|Y
01|235069|2|2|the event of a sustained tariff increase on the|Y
01|235069|2|3|importation of this product.  Any surcharge will be|Y
01|235069|2|4|disclosed prior to acceptance of an order.|Y
01|235070|2|1|A tariff surcharge may be added to this quotation in|Y
01|235070|2|2|the event of a sustained tariff increase on the|Y
01|235070|2|3|importation of this product.  Any surcharge will be|Y
01|235070|2|4|disclosed prior to acceptance of an order.|Y
01|235071|4|1|A tariff surcharge may be added to this quotation in|Y
01|235071|4|2|the event of a sustained tariff increase on the|Y
01|235071|4|3|importation of this product.  Any surcharge will be|Y
01|235071|4|4|disclosed prior to acceptance of an order.|Y
01|235072|2|1|A tariff surcharge may be added to this quotation in|Y
01|235072|2|2|the event of a sustained tariff increase on the|Y
01|235072|2|3|importation of this product.  Any surcharge will be|Y
01|235072|2|4|disclosed prior to acceptance of an order.|Y
01|235073|2|1|A tariff surcharge may be added to this quotation in|Y
01|235073|2|2|the event of a sustained tariff increase on the|Y
01|235073|2|3|importation of this product.  Any surcharge will be|Y
01|235073|2|4|disclosed prior to acceptance of an order.|Y
01|235074|1|1|CAT40-C1.1/4SL-105U-IDU-DIN-M|Y
01|235074|3|1|A tariff surcharge may be added to this quotation in|Y
01|235074|3|2|the event of a sustained tariff increase on the|Y
01|235074|3|3|importation of this product.  Any surcharge will be|Y
01|235074|3|4|disclosed prior to acceptance of an order.|Y
01|235075|4|1|A tariff surcharge may be added to this quotation in|Y
01|235075|4|2|the event of a sustained tariff increase on the|Y
01|235075|4|3|importation of this product.  Any surcharge will be|Y
01|235075|4|4|disclosed prior to acceptance of an order.|Y
01|235076|14|1|Please Note: This is a torque wrench and can be used|Y
01|235076|14|2|with adapters quoted.|Y
01|235076|15|1|Please Note: This is just a handle that can be used|Y
01|235076|15|2|with the adapters.|Y
01|235077|2|1|Please note additional 20% applied per overstock promo.|Y
01|235077|2|2|Once PO/order issued these cannot be cancelled or|Y
01|235077|2|3|returned. This will need to be requoted upon stock|Y
01|235077|2|4|depletion.|Y
01|235077|4|1|Please note this is special stock quoted at net price.|Y
01|235077|4|2|Once PO/order issued these cannot be cancelled or|Y
01|235077|4|3|returned. This will need to be requoted upon stock|Y
01|235077|4|4|depletion.|Y
01|235077|5|1|A tariff surcharge may be added to this quotation in|Y
01|235077|5|2|the event of a sustained tariff increase on the|Y
01|235077|5|3|importation of this product.  Any surcharge will be|Y
01|235077|5|4|disclosed prior to acceptance of an order.|Y
01|235078|2|1|A tariff surcharge may be added to this quotation in|Y
01|235078|2|2|the event of a sustained tariff increase on the|Y
01|235078|2|3|importation of this product.  Any surcharge will be|Y
01|235078|2|4|disclosed prior to acceptance of an order.|Y
01|235079|2|1|A tariff surcharge may be added to this quotation in|Y
01|235079|2|2|the event of a sustained tariff increase on the|Y
01|235079|2|3|importation of this product.  Any surcharge will be|Y
01|235079|2|4|disclosed prior to acceptance of an order.|Y
01|235080|2|1|A tariff surcharge may be added to this quotation in|Y
01|235080|2|2|the event of a sustained tariff increase on the|Y
01|235080|2|3|importation of this product.  Any surcharge will be|Y
01|235080|2|4|disclosed prior to acceptance of an order.|Y
01|235081|2|1|A tariff surcharge may be added to this quotation in|Y
01|235081|2|2|the event of a sustained tariff increase on the|Y
01|235081|2|3|importation of this product.  Any surcharge will be|Y
01|235081|2|4|disclosed prior to acceptance of an order.|Y
01|235082|3|1|A tariff surcharge may be added to this quotation in|Y
01|235082|3|2|the event of a sustained tariff increase on the|Y
01|235082|3|3|importation of this product.  Any surcharge will be|Y
01|235082|3|4|disclosed prior to acceptance of an order.|Y
01|235083|2|1|A tariff surcharge may be added to this quotation in|Y
01|235083|2|2|the event of a sustained tariff increase on the|Y
01|235083|2|3|importation of this product.  Any surcharge will be|Y
01|235083|2|4|disclosed prior to acceptance of an order.|Y
01|235084|3|1|A tariff surcharge may be added to this quotation in|Y
01|235084|3|2|the event of a sustained tariff increase on the|Y
01|235084|3|3|importation of this product.  Any surcharge will be|Y
01|235084|3|4|disclosed prior to acceptance of an order.|Y
01|235085|2|1|A tariff surcharge may be added to this quotation in|Y
01|235085|2|2|the event of a sustained tariff increase on the|Y
01|235085|2|3|importation of this product.  Any surcharge will be|Y
01|235085|2|4|disclosed prior to acceptance of an order.|Y
01|235086|6|1|A tariff surcharge may be added to this quotation in|Y
01|235086|6|2|the event of a sustained tariff increase on the|Y
01|235086|6|3|importation of this product.  Any surcharge will be|Y
01|235086|6|4|disclosed prior to acceptance of an order.|Y
01|235087|2|1|A tariff surcharge may be added to this quotation in|Y
01|235087|2|2|the event of a sustained tariff increase on the|Y
01|235087|2|3|importation of this product.  Any surcharge will be|Y
01|235087|2|4|disclosed prior to acceptance of an order.|Y
01|235088|7|1|A tariff surcharge may be added to this quotation in|Y
01|235088|7|2|the event of a sustained tariff increase on the|Y
01|235088|7|3|importation of this product.  Any surcharge will be|Y
01|235088|7|4|disclosed prior to acceptance of an order.|Y
01|235089|1|1|1st batch(Part# change only) 3/13:APRVD(TimR)|Y
01|235089|2|1|A tariff surcharge may be added to this quotation in|Y
01|235089|2|2|the event of a sustained tariff increase on the|Y
01|235089|2|3|importation of this product.  Any surcharge will be|Y
01|235089|2|4|disclosed prior to acceptance of an order.|Y
01|235090|1|1|EXTERNAL POWER + FEEDBACK CABLES ARE ALREADY INCLUDED.|Y
01|235090|1|2|THEY ARE HARD WIRED INTO THE ROTARY TABLE ITSELF|Y
01|235090|1|4|4+2 PORT ROTARY JOINT IS BUILT-IN TO ROTARY TABLE|Y
01|235090|2|1|ADAPTER PLATE FOR P160 PNEUMATIC VISE|Y
01|235090|4|1|A tariff surcharge may be added to this quotation in|Y
01|235090|4|2|the event of a sustained tariff increase on the|Y
01|235090|4|3|importation of this product.  Any surcharge will be|Y
01|235090|4|4|disclosed prior to acceptance of an order.|Y
01|235091|3|1|E12 Torx Socket given at no-charge.  This item cannot|Y
01|235091|3|2|be returned.|Y
01|235091|8|1|A tariff surcharge may be added to this quotation in|Y
01|235091|8|2|the event of a sustained tariff increase on the|Y
01|235091|8|3|importation of this product.  Any surcharge will be|Y
01|235091|8|4|disclosed prior to acceptance of an order.|Y
01|235092|1|1|RGA#TAR-62043|Y
01|235092|1|2|CNCZ302FA-HS 10+1RJ SN: 7180|Y
01|235092|22|1|A tariff surcharge may be added to this quotation in|Y
01|235092|22|2|the event of a sustained tariff increase on the|Y
01|235092|22|3|importation of this product.  Any surcharge will be|Y
01|235092|22|4|disclosed prior to acceptance of an order.|Y
01|235093|4|1|A tariff surcharge may be added to this quotation in|Y
01|235093|4|2|the event of a sustained tariff increase on the|Y
01|235093|4|3|importation of this product.  Any surcharge will be|Y
01|235093|4|4|disclosed prior to acceptance of an order.|Y
01|235094|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|235094|2|2|FANUC ROBODRILL D28LIB5 W/ 100MM COLUMN RISER|Y
01|235094|3|1|A tariff surcharge may be added to this quotation in|Y
01|235094|3|2|the event of a sustained tariff increase on the|Y
01|235094|3|3|importation of this product.  Any surcharge will be|Y
01|235094|3|4|disclosed prior to acceptance of an order.|Y
01|235095|9|1|A tariff surcharge may be added to this quotation in|Y
01|235095|9|2|the event of a sustained tariff increase on the|Y
01|235095|9|3|importation of this product.  Any surcharge will be|Y
01|235095|9|4|disclosed prior to acceptance of an order.|Y
01|235096|7|1|A tariff surcharge may be added to this quotation in|Y
01|235096|7|2|the event of a sustained tariff increase on the|Y
01|235096|7|3|importation of this product.  Any surcharge will be|Y
01|235096|7|4|disclosed prior to acceptance of an order.|Y
01|235097|2|1|A tariff surcharge may be added to this quotation in|Y
01|235097|2|2|the event of a sustained tariff increase on the|Y
01|235097|2|3|importation of this product.  Any surcharge will be|Y
01|235097|2|4|disclosed prior to acceptance of an order.|Y
01|235098|3|1|A tariff surcharge may be added to this quotation in|Y
01|235098|3|2|the event of a sustained tariff increase on the|Y
01|235098|3|3|importation of this product.  Any surcharge will be|Y
01|235098|3|4|disclosed prior to acceptance of an order.|Y
01|235099|3|1|A tariff surcharge may be added to this quotation in|Y
01|235099|3|2|the event of a sustained tariff increase on the|Y
01|235099|3|3|importation of this product.  Any surcharge will be|Y
01|235099|3|4|disclosed prior to acceptance of an order.|Y
01|235100|3|1|A tariff surcharge may be added to this quotation in|Y
01|235100|3|2|the event of a sustained tariff increase on the|Y
01|235100|3|3|importation of this product.  Any surcharge will be|Y
01|235100|3|4|disclosed prior to acceptance of an order.|Y
01|235101|5|1|A tariff surcharge of 8% will be added to every order|Y
01|235101|5|2|placed after September 1st 2025(until further notice).|Y
01|235101|5|3|This surcharge will be acknowledged upon acceptance|Y
01|235101|5|4|of every order.|Y
01|235102|4|1|A tariff surcharge may be added to this quotation in|Y
01|235102|4|2|the event of a sustained tariff increase on the|Y
01|235102|4|3|importation of this product.  Any surcharge will be|Y
01|235102|4|4|disclosed prior to acceptance of an order.|Y
01|235104|18|1|A tariff surcharge may be added to this quotation in|Y
01|235104|18|2|the event of a sustained tariff increase on the|Y
01|235104|18|3|importation of this product.  Any surcharge will be|Y
01|235104|18|4|disclosed prior to acceptance of an order.|Y
01|235105|14|1|A tariff surcharge may be added to this quotation in|Y
01|235105|14|2|the event of a sustained tariff increase on the|Y
01|235105|14|3|importation of this product.  Any surcharge will be|Y
01|235105|14|4|disclosed prior to acceptance of an order.|Y
01|235106|11|1|A tariff surcharge may be added to this quotation in|Y
01|235106|11|2|the event of a sustained tariff increase on the|Y
01|235106|11|3|importation of this product.  Any surcharge will be|Y
01|235106|11|4|disclosed prior to acceptance of an order.|Y
01|235107|4|1|A tariff surcharge may be added to this quotation in|Y
01|235107|4|2|the event of a sustained tariff increase on the|Y
01|235107|4|3|importation of this product.  Any surcharge will be|Y
01|235107|4|4|disclosed prior to acceptance of an order.|Y
01|235108|3|1|ST50-SF0250-6.30|Y
01|235108|4|1|A tariff surcharge may be added to this quotation in|Y
01|235108|4|2|the event of a sustained tariff increase on the|Y
01|235108|4|3|importation of this product.  Any surcharge will be|Y
01|235108|4|4|disclosed prior to acceptance of an order.|Y
01|235109|2|1|A tariff surcharge may be added to this quotation in|Y
01|235109|2|2|the event of a sustained tariff increase on the|Y
01|235109|2|3|importation of this product.  Any surcharge will be|Y
01|235109|2|4|disclosed prior to acceptance of an order.|Y
01|235110|2|1|A tariff surcharge may be added to this quotation in|Y
01|235110|2|2|the event of a sustained tariff increase on the|Y
01|235110|2|3|importation of this product.  Any surcharge will be|Y
01|235110|2|4|disclosed prior to acceptance of an order.|Y
01|235111|2|1|ER32 special collet to hold 1/2.|Y
01|235111|2|2|Coolant with slots that lead to the face of the collet.|Y
01|235111|2|3|Price quote is NET price to Thomas Skinner|Y
01|235111|3|1|A tariff surcharge may be added to this quotation in|Y
01|235111|3|2|the event of a sustained tariff increase on the|Y
01|235111|3|3|importation of this product.  Any surcharge will be|Y
01|235111|3|4|disclosed prior to acceptance of an order.|Y
01|235112|8|1|A tariff surcharge may be added to this quotation in|Y
01|235112|8|2|the event of a sustained tariff increase on the|Y
01|235112|8|3|importation of this product.  Any surcharge will be|Y
01|235112|8|4|disclosed prior to acceptance of an order.|Y
01|235113|4|1|A tariff surcharge may be added to this quotation in|Y
01|235113|4|2|the event of a sustained tariff increase on the|Y
01|235113|4|3|importation of this product.  Any surcharge will be|Y
01|235113|4|4|disclosed prior to acceptance of an order.|Y
01|235114|2|1|A tariff surcharge may be added to this quotation in|Y
01|235114|2|2|the event of a sustained tariff increase on the|Y
01|235114|2|3|importation of this product.  Any surcharge will be|Y
01|235114|2|4|disclosed prior to acceptance of an order.|Y
01|235115|2|1|A tariff surcharge may be added to this quotation in|Y
01|235115|2|2|the event of a sustained tariff increase on the|Y
01|235115|2|3|importation of this product.  Any surcharge will be|Y
01|235115|2|4|disclosed prior to acceptance of an order.|Y
01|235116|3|1|A tariff surcharge may be added to this quotation in|Y
01|235116|3|2|the event of a sustained tariff increase on the|Y
01|235116|3|3|importation of this product.  Any surcharge will be|Y
01|235116|3|4|disclosed prior to acceptance of an order.|Y
01|235117|2|1|A tariff surcharge may be added to this quotation in|Y
01|235117|2|2|the event of a sustained tariff increase on the|Y
01|235117|2|3|importation of this product.  Any surcharge will be|Y
01|235117|2|4|disclosed prior to acceptance of an order.|Y
01|235118|2|1|A tariff surcharge may be added to this quotation in|Y
01|235118|2|2|the event of a sustained tariff increase on the|Y
01|235118|2|3|importation of this product.  Any surcharge will be|Y
01|235118|2|4|disclosed prior to acceptance of an order.|Y
01|235119|2|1|A tariff surcharge may be added to this quotation in|Y
01|235119|2|2|the event of a sustained tariff increase on the|Y
01|235119|2|3|importation of this product.  Any surcharge will be|Y
01|235119|2|4|disclosed prior to acceptance of an order.|Y
01|235120|5|1|A tariff surcharge may be added to this quotation in|Y
01|235120|5|2|the event of a sustained tariff increase on the|Y
01|235120|5|3|importation of this product.  Any surcharge will be|Y
01|235120|5|4|disclosed prior to acceptance of an order.|Y
01|235121|2|1|A tariff surcharge may be added to this quotation in|Y
01|235121|2|2|the event of a sustained tariff increase on the|Y
01|235121|2|3|importation of this product.  Any surcharge will be|Y
01|235121|2|4|disclosed prior to acceptance of an order.|Y
01|235122|12|1|A tariff surcharge may be added to this quotation in|Y
01|235122|12|2|the event of a sustained tariff increase on the|Y
01|235122|12|3|importation of this product.  Any surcharge will be|Y
01|235122|12|4|disclosed prior to acceptance of an order.|Y
01|235123|3|1|A tariff surcharge may be added to this quotation in|Y
01|235123|3|2|the event of a sustained tariff increase on the|Y
01|235123|3|3|importation of this product.  Any surcharge will be|Y
01|235123|3|4|disclosed prior to acceptance of an order.|Y
01|235124|6|1|A tariff surcharge may be added to this quotation in|Y
01|235124|6|2|the event of a sustained tariff increase on the|Y
01|235124|6|3|importation of this product.  Any surcharge will be|Y
01|235124|6|4|disclosed prior to acceptance of an order.|Y
01|235125|6|1|A tariff surcharge may be added to this quotation in|Y
01|235125|6|2|the event of a sustained tariff increase on the|Y
01|235125|6|3|importation of this product.  Any surcharge will be|Y
01|235125|6|4|disclosed prior to acceptance of an order.|Y
01|235127|1|1|This product is at Allendale in the showroom.|N
01|235127|-13|1|A tariff surcharge may be added to this quotation in|Y
01|235127|-13|2|the event of a sustained tariff increase on the|Y
01|235127|-13|3|importation of this product.  Any surcharge will be|Y
01|235127|-13|4|disclosed prior to acceptance of an order.|Y
01|235129|-13|1|A tariff surcharge may be added to this quotation in|Y
01|235129|-13|2|the event of a sustained tariff increase on the|Y
01|235129|-13|3|importation of this product.  Any surcharge will be|Y
01|235129|-13|4|disclosed prior to acceptance of an order.|Y
01|235130|2|1|A tariff surcharge may be added to this quotation in|Y
01|235130|2|2|the event of a sustained tariff increase on the|Y
01|235130|2|3|importation of this product.  Any surcharge will be|Y
01|235130|2|4|disclosed prior to acceptance of an order.|Y
01|235131|2|1|A tariff surcharge may be added to this quotation in|Y
01|235131|2|2|the event of a sustained tariff increase on the|Y
01|235131|2|3|importation of this product.  Any surcharge will be|Y
01|235131|2|4|disclosed prior to acceptance of an order.|Y
01|235132|2|1|A tariff surcharge may be added to this quotation in|Y
01|235132|2|2|the event of a sustained tariff increase on the|Y
01|235132|2|3|importation of this product.  Any surcharge will be|Y
01|235132|2|4|disclosed prior to acceptance of an order.|Y
01|235133|3|1|A tariff surcharge may be added to this quotation in|Y
01|235133|3|2|the event of a sustained tariff increase on the|Y
01|235133|3|3|importation of this product.  Any surcharge will be|Y
01|235133|3|4|disclosed prior to acceptance of an order.|Y
01|235134|3|1|A tariff surcharge may be added to this quotation in|Y
01|235134|3|2|the event of a sustained tariff increase on the|Y
01|235134|3|3|importation of this product.  Any surcharge will be|Y
01|235134|3|4|disclosed prior to acceptance of an order.|Y
01|235135|3|1|A tariff surcharge may be added to this quotation in|Y
01|235135|3|2|the event of a sustained tariff increase on the|Y
01|235135|3|3|importation of this product.  Any surcharge will be|Y
01|235135|3|4|disclosed prior to acceptance of an order.|Y
01|235136|4|1|A tariff surcharge may be added to this quotation in|Y
01|235136|4|2|the event of a sustained tariff increase on the|Y
01|235136|4|3|importation of this product.  Any surcharge will be|Y
01|235136|4|4|disclosed prior to acceptance of an order.|Y
01|235137|4|1|A tariff surcharge may be added to this quotation in|Y
01|235137|4|2|the event of a sustained tariff increase on the|Y
01|235137|4|3|importation of this product.  Any surcharge will be|Y
01|235137|4|4|disclosed prior to acceptance of an order.|Y
01|235138|2|1|A tariff surcharge may be added to this quotation in|Y
01|235138|2|2|the event of a sustained tariff increase on the|Y
01|235138|2|3|importation of this product.  Any surcharge will be|Y
01|235138|2|4|disclosed prior to acceptance of an order.|Y
01|235139|2|1|Alternative to 165 GL|Y
01|235139|3|1|Alternative to 165 GL|Y
01|235139|11|1|A tariff surcharge may be added to this quotation in|Y
01|235139|11|2|the event of a sustained tariff increase on the|Y
01|235139|11|3|importation of this product.  Any surcharge will be|Y
01|235139|11|4|disclosed prior to acceptance of an order.|Y
01|235140|2|1|A tariff surcharge may be added to this quotation in|Y
01|235140|2|2|the event of a sustained tariff increase on the|Y
01|235140|2|3|importation of this product.  Any surcharge will be|Y
01|235140|2|4|disclosed prior to acceptance of an order.|Y
01|235141|12|1|A tariff surcharge may be added to this quotation in|Y
01|235141|12|2|the event of a sustained tariff increase on the|Y
01|235141|12|3|importation of this product.  Any surcharge will be|Y
01|235141|12|4|disclosed prior to acceptance of an order.|Y
01|235142|15|1|A tariff surcharge of 8% will be added to every order|Y
01|235142|15|2|placed after September 1st 2025(until further notice).|Y
01|235142|15|3|This surcharge will be acknowledged upon acceptance|Y
01|235142|15|4|of every order.|Y
01|235143|1|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|235143|2|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|235143|3|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|235143|4|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|235143|5|1|Req.INS/OD Groove frange Dia issue|Y
01|235143|6|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|235143|7|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|N
01|235143|8|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|235143|9|1|A tariff surcharge may be added to this quotation in|Y
01|235143|9|2|the event of a sustained tariff increase on the|Y
01|235143|9|3|importation of this product.  Any surcharge will be|Y
01|235143|9|4|disclosed prior to acceptance of an order.|Y
01|235144|2|1|A tariff surcharge may be added to this quotation in|Y
01|235144|2|2|the event of a sustained tariff increase on the|Y
01|235144|2|3|importation of this product.  Any surcharge will be|Y
01|235144|2|4|disclosed prior to acceptance of an order.|Y
01|235145|4|1|A tariff surcharge may be added to this quotation in|Y
01|235145|4|2|the event of a sustained tariff increase on the|Y
01|235145|4|3|importation of this product.  Any surcharge will be|Y
01|235145|4|4|disclosed prior to acceptance of an order.|Y
01|235146|2|1|A tariff surcharge may be added to this quotation in|Y
01|235146|2|2|the event of a sustained tariff increase on the|Y
01|235146|2|3|importation of this product.  Any surcharge will be|Y
01|235146|2|4|disclosed prior to acceptance of an order.|Y
01|235147|3|1|A tariff surcharge may be added to this quotation in|Y
01|235147|3|2|the event of a sustained tariff increase on the|Y
01|235147|3|3|importation of this product.  Any surcharge will be|Y
01|235147|3|4|disclosed prior to acceptance of an order.|Y
01|235148|2|1|A tariff surcharge may be added to this quotation in|Y
01|235148|2|2|the event of a sustained tariff increase on the|Y
01|235148|2|3|importation of this product.  Any surcharge will be|Y
01|235148|2|4|disclosed prior to acceptance of an order.|Y
01|235149|2|1|A tariff surcharge may be added to this quotation in|Y
01|235149|2|2|the event of a sustained tariff increase on the|Y
01|235149|2|3|importation of this product.  Any surcharge will be|Y
01|235149|2|4|disclosed prior to acceptance of an order.|Y
01|235150|4|1|A tariff surcharge may be added to this quotation in|Y
01|235150|4|2|the event of a sustained tariff increase on the|Y
01|235150|4|3|importation of this product.  Any surcharge will be|Y
01|235150|4|4|disclosed prior to acceptance of an order.|Y
01|235151|11|1|A tariff surcharge may be added to this quotation in|Y
01|235151|11|2|the event of a sustained tariff increase on the|Y
01|235151|11|3|importation of this product.  Any surcharge will be|Y
01|235151|11|4|disclosed prior to acceptance of an order.|Y
01|235152|4|1|A tariff surcharge may be added to this quotation in|Y
01|235152|4|2|the event of a sustained tariff increase on the|Y
01|235152|4|3|importation of this product.  Any surcharge will be|Y
01|235152|4|4|disclosed prior to acceptance of an order.|Y
01|235153|3|1|A tariff surcharge may be added to this quotation in|Y
01|235153|3|2|the event of a sustained tariff increase on the|Y
01|235153|3|3|importation of this product.  Any surcharge will be|Y
01|235153|3|4|disclosed prior to acceptance of an order.|Y
01|235154|2|1|A tariff surcharge may be added to this quotation in|Y
01|235154|2|2|the event of a sustained tariff increase on the|Y
01|235154|2|3|importation of this product.  Any surcharge will be|Y
01|235154|2|4|disclosed prior to acceptance of an order.|Y
01|235155|4|1|A tariff surcharge may be added to this quotation in|Y
01|235155|4|2|the event of a sustained tariff increase on the|Y
01|235155|4|3|importation of this product.  Any surcharge will be|Y
01|235155|4|4|disclosed prior to acceptance of an order.|Y
01|235156|6|1|A tariff surcharge may be added to this quotation in|Y
01|235156|6|2|the event of a sustained tariff increase on the|Y
01|235156|6|3|importation of this product.  Any surcharge will be|Y
01|235156|6|4|disclosed prior to acceptance of an order.|Y
01|235157|2|1|A tariff surcharge may be added to this quotation in|Y
01|235157|2|2|the event of a sustained tariff increase on the|Y
01|235157|2|3|importation of this product.  Any surcharge will be|Y
01|235157|2|4|disclosed prior to acceptance of an order.|Y
01|235158|7|1|A tariff surcharge may be added to this quotation in|Y
01|235158|7|2|the event of a sustained tariff increase on the|Y
01|235158|7|3|importation of this product.  Any surcharge will be|Y
01|235158|7|4|disclosed prior to acceptance of an order.|Y
01|235159|4|1|A tariff surcharge may be added to this quotation in|Y
01|235159|4|2|the event of a sustained tariff increase on the|Y
01|235159|4|3|importation of this product.  Any surcharge will be|Y
01|235159|4|4|disclosed prior to acceptance of an order.|Y
01|235160|3|1|A tariff surcharge may be added to this quotation in|Y
01|235160|3|2|the event of a sustained tariff increase on the|Y
01|235160|3|3|importation of this product.  Any surcharge will be|Y
01|235160|3|4|disclosed prior to acceptance of an order.|Y
01|235161|11|1|A tariff surcharge may be added to this quotation in|Y
01|235161|11|2|the event of a sustained tariff increase on the|Y
01|235161|11|3|importation of this product.  Any surcharge will be|Y
01|235161|11|4|disclosed prior to acceptance of an order.|Y
01|235162|2|1|A tariff surcharge may be added to this quotation in|Y
01|235162|2|2|the event of a sustained tariff increase on the|Y
01|235162|2|3|importation of this product.  Any surcharge will be|Y
01|235162|2|4|disclosed prior to acceptance of an order.|Y
01|235164|9|1|A tariff surcharge may be added to this quotation in|Y
01|235164|9|2|the event of a sustained tariff increase on the|Y
01|235164|9|3|importation of this product.  Any surcharge will be|Y
01|235164|9|4|disclosed prior to acceptance of an order.|Y
01|235165|4|1|A tariff surcharge may be added to this quotation in|Y
01|235165|4|2|the event of a sustained tariff increase on the|Y
01|235165|4|3|importation of this product.  Any surcharge will be|Y
01|235165|4|4|disclosed prior to acceptance of an order.|Y
01|235166|2|1|A tariff surcharge may be added to this quotation in|Y
01|235166|2|2|the event of a sustained tariff increase on the|Y
01|235166|2|3|importation of this product.  Any surcharge will be|Y
01|235166|2|4|disclosed prior to acceptance of an order.|Y
01|235167|2|1|A tariff surcharge may be added to this quotation in|Y
01|235167|2|2|the event of a sustained tariff increase on the|Y
01|235167|2|3|importation of this product.  Any surcharge will be|Y
01|235167|2|4|disclosed prior to acceptance of an order.|Y
01|235168|1|1|S#6680|Y
01|235169|2|1|A tariff surcharge may be added to this quotation in|Y
01|235169|2|2|the event of a sustained tariff increase on the|Y
01|235169|2|3|importation of this product.  Any surcharge will be|Y
01|235169|2|4|disclosed prior to acceptance of an order.|Y
01|235170|5|1|A tariff surcharge may be added to this quotation in|Y
01|235170|5|2|the event of a sustained tariff increase on the|Y
01|235170|5|3|importation of this product.  Any surcharge will be|Y
01|235170|5|4|disclosed prior to acceptance of an order.|Y
01|235171|4|1|A tariff surcharge may be added to this quotation in|Y
01|235171|4|2|the event of a sustained tariff increase on the|Y
01|235171|4|3|importation of this product.  Any surcharge will be|Y
01|235171|4|4|disclosed prior to acceptance of an order.|Y
01|235172|3|1|A tariff surcharge may be added to this quotation in|Y
01|235172|3|2|the event of a sustained tariff increase on the|Y
01|235172|3|3|importation of this product.  Any surcharge will be|Y
01|235172|3|4|disclosed prior to acceptance of an order.|Y
01|235173|2|1|A tariff surcharge may be added to this quotation in|Y
01|235173|2|2|the event of a sustained tariff increase on the|Y
01|235173|2|3|importation of this product.  Any surcharge will be|Y
01|235173|2|4|disclosed prior to acceptance of an order.|Y
01|235174|5|1|A tariff surcharge may be added to this quotation in|Y
01|235174|5|2|the event of a sustained tariff increase on the|Y
01|235174|5|3|importation of this product.  Any surcharge will be|Y
01|235174|5|4|disclosed prior to acceptance of an order.|Y
01|235175|2|1|A tariff surcharge may be added to this quotation in|Y
01|235175|2|2|the event of a sustained tariff increase on the|Y
01|235175|2|3|importation of this product.  Any surcharge will be|Y
01|235175|2|4|disclosed prior to acceptance of an order.|Y
01|235176|6|1|A tariff surcharge may be added to this quotation in|Y
01|235176|6|2|the event of a sustained tariff increase on the|Y
01|235176|6|3|importation of this product.  Any surcharge will be|Y
01|235176|6|4|disclosed prior to acceptance of an order.|Y
01|235179|2|1|Please note additional 20% applied per overstock promo.|Y
01|235179|2|2|Once PO/order is issued these cannot be cancelled or|Y
01|235179|2|3|returned. This will need to be requoted upon stock|Y
01|235179|2|4|depletion.|Y
01|235179|10|1|A tariff surcharge may be added to this quotation in|Y
01|235179|10|2|the event of a sustained tariff increase on the|Y
01|235179|10|3|importation of this product.  Any surcharge will be|Y
01|235179|10|4|disclosed prior to acceptance of an order.|Y
01|235180|4|1|A tariff surcharge may be added to this quotation in|Y
01|235180|4|2|the event of a sustained tariff increase on the|Y
01|235180|4|3|importation of this product.  Any surcharge will be|Y
01|235180|4|4|disclosed prior to acceptance of an order.|Y
01|235181|10|1|A tariff surcharge may be added to this quotation in|Y
01|235181|10|2|the event of a sustained tariff increase on the|Y
01|235181|10|3|importation of this product.  Any surcharge will be|Y
01|235181|10|4|disclosed prior to acceptance of an order.|Y
01|235182|2|1|A tariff surcharge may be added to this quotation in|Y
01|235182|2|2|the event of a sustained tariff increase on the|Y
01|235182|2|3|importation of this product.  Any surcharge will be|Y
01|235182|2|4|disclosed prior to acceptance of an order.|Y
01|235183|-13|1|A tariff surcharge may be added to this quotation in|Y
01|235183|-13|2|the event of a sustained tariff increase on the|Y
01|235183|-13|3|importation of this product.  Any surcharge will be|Y
01|235183|-13|4|disclosed prior to acceptance of an order.|Y
01|235184|11|1|A tariff surcharge may be added to this quotation in|Y
01|235184|11|2|the event of a sustained tariff increase on the|Y
01|235184|11|3|importation of this product.  Any surcharge will be|Y
01|235184|11|4|disclosed prior to acceptance of an order.|Y
01|235185|2|1|A tariff surcharge may be added to this quotation in|Y
01|235185|2|2|the event of a sustained tariff increase on the|Y
01|235185|2|3|importation of this product.  Any surcharge will be|Y
01|235185|2|4|disclosed prior to acceptance of an order.|Y
01|235186|4|1|A tariff surcharge may be added to this quotation in|Y
01|235186|4|2|the event of a sustained tariff increase on the|Y
01|235186|4|3|importation of this product.  Any surcharge will be|Y
01|235186|4|4|disclosed prior to acceptance of an order.|Y
01|235187|9|1|A tariff surcharge may be added to this quotation in|Y
01|235187|9|2|the event of a sustained tariff increase on the|Y
01|235187|9|3|importation of this product.  Any surcharge will be|Y
01|235187|9|4|disclosed prior to acceptance of an order.|Y
01|235189|3|1|Customer is responsible for third party software|Y
01|235189|3|2|option if necessary.|Y
01|235189|3|3|Installation is optional.|Y
01|235189|4|1|A tariff surcharge may be added to this quotation in|Y
01|235189|4|2|the event of a sustained tariff increase on the|Y
01|235189|4|3|importation of this product.  Any surcharge will be|Y
01|235189|4|4|disclosed prior to acceptance of an order.|Y
01|235190|2|1|A tariff surcharge may be added to this quotation in|Y
01|235190|2|2|the event of a sustained tariff increase on the|Y
01|235190|2|3|importation of this product.  Any surcharge will be|Y
01|235190|2|4|disclosed prior to acceptance of an order.|Y
01|235191|1|1|J16-18-80C 16mm carbide boring bar|N
01|235191|9|1|A tariff surcharge may be added to this quotation in|Y
01|235191|9|2|the event of a sustained tariff increase on the|Y
01|235191|9|3|importation of this product.  Any surcharge will be|Y
01|235191|9|4|disclosed prior to acceptance of an order.|Y
01|235192|2|1|A tariff surcharge may be added to this quotation in|Y
01|235192|2|2|the event of a sustained tariff increase on the|Y
01|235192|2|3|importation of this product.  Any surcharge will be|Y
01|235192|2|4|disclosed prior to acceptance of an order.|Y
01|235194|5|1|A tariff surcharge may be added to this quotation in|Y
01|235194|5|2|the event of a sustained tariff increase on the|Y
01|235194|5|3|importation of this product.  Any surcharge will be|Y
01|235194|5|4|disclosed prior to acceptance of an order.|Y
01|235195|2|1|Please Note: An extra 20% has been added to the|Y
01|235195|2|2|discount as an Overstock promotion.|Y
01|235195|2|3|This item is non-returnable.|Y
01|235195|3|1|A tariff surcharge may be added to this quotation in|Y
01|235195|3|2|the event of a sustained tariff increase on the|Y
01|235195|3|3|importation of this product.  Any surcharge will be|Y
01|235195|3|4|disclosed prior to acceptance of an order.|Y
01|235196|1|1|Includes cable sets|Y
01|235196|5|1|A tariff surcharge may be added to this quotation in|Y
01|235196|5|2|the event of a sustained tariff increase on the|Y
01|235196|5|3|importation of this product.  Any surcharge will be|Y
01|235196|5|4|disclosed prior to acceptance of an order.|Y
01|235197|3|1|A tariff surcharge may be added to this quotation in|Y
01|235197|3|2|the event of a sustained tariff increase on the|Y
01|235197|3|3|importation of this product.  Any surcharge will be|Y
01|235197|3|4|disclosed prior to acceptance of an order.|Y
01|235198|2|1|A tariff surcharge may be added to this quotation in|Y
01|235198|2|2|the event of a sustained tariff increase on the|Y
01|235198|2|3|importation of this product.  Any surcharge will be|Y
01|235198|2|4|disclosed prior to acceptance of an order.|Y
01|235199|2|1|A tariff surcharge may be added to this quotation in|Y
01|235199|2|2|the event of a sustained tariff increase on the|Y
01|235199|2|3|importation of this product.  Any surcharge will be|Y
01|235199|2|4|disclosed prior to acceptance of an order.|Y
01|235200|2|1|A tariff surcharge may be added to this quotation in|Y
01|235200|2|2|the event of a sustained tariff increase on the|Y
01|235200|2|3|importation of this product.  Any surcharge will be|Y
01|235200|2|4|disclosed prior to acceptance of an order.|Y
01|235201|2|1|A tariff surcharge may be added to this quotation in|Y
01|235201|2|2|the event of a sustained tariff increase on the|Y
01|235201|2|3|importation of this product.  Any surcharge will be|Y
01|235201|2|4|disclosed prior to acceptance of an order.|Y
01|235202|4|1|A tariff surcharge may be added to this quotation in|Y
01|235202|4|2|the event of a sustained tariff increase on the|Y
01|235202|4|3|importation of this product.  Any surcharge will be|Y
01|235202|4|4|disclosed prior to acceptance of an order.|Y
01|235203|2|1|A tariff surcharge may be added to this quotation in|Y
01|235203|2|2|the event of a sustained tariff increase on the|Y
01|235203|2|3|importation of this product.  Any surcharge will be|Y
01|235203|2|4|disclosed prior to acceptance of an order.|Y
01|235204|1|1|cat40-hc10-90|Y
01|235204|2|1|A tariff surcharge may be added to this quotation in|Y
01|235204|2|2|the event of a sustained tariff increase on the|Y
01|235204|2|3|importation of this product.  Any surcharge will be|Y
01|235204|2|4|disclosed prior to acceptance of an order.|Y
01|235205|4|1|A tariff surcharge may be added to this quotation in|Y
01|235205|4|2|the event of a sustained tariff increase on the|Y
01|235205|4|3|importation of this product.  Any surcharge will be|Y
01|235205|4|4|disclosed prior to acceptance of an order.|Y
01|235206|6|1|A tariff surcharge may be added to this quotation in|Y
01|235206|6|2|the event of a sustained tariff increase on the|Y
01|235206|6|3|importation of this product.  Any surcharge will be|Y
01|235206|6|4|disclosed prior to acceptance of an order.|Y
01|235207|4|1|A tariff surcharge may be added to this quotation in|Y
01|235207|4|2|the event of a sustained tariff increase on the|Y
01|235207|4|3|importation of this product.  Any surcharge will be|Y
01|235207|4|4|disclosed prior to acceptance of an order.|Y
01|235208|2|1|A tariff surcharge may be added to this quotation in|Y
01|235208|2|2|the event of a sustained tariff increase on the|Y
01|235208|2|3|importation of this product.  Any surcharge will be|Y
01|235208|2|4|disclosed prior to acceptance of an order.|Y
01|235209|4|1|A tariff surcharge may be added to this quotation in|Y
01|235209|4|2|the event of a sustained tariff increase on the|Y
01|235209|4|3|importation of this product.  Any surcharge will be|Y
01|235209|4|4|disclosed prior to acceptance of an order.|Y
01|235210|3|1|A tariff surcharge may be added to this quotation in|Y
01|235210|3|2|the event of a sustained tariff increase on the|Y
01|235210|3|3|importation of this product.  Any surcharge will be|Y
01|235210|3|4|disclosed prior to acceptance of an order.|Y
01|235212|2|1|A tariff surcharge may be added to this quotation in|Y
01|235212|2|2|the event of a sustained tariff increase on the|Y
01|235212|2|3|importation of this product.  Any surcharge will be|Y
01|235212|2|4|disclosed prior to acceptance of an order.|Y
01|235213|2|1|A tariff surcharge may be added to this quotation in|Y
01|235213|2|2|the event of a sustained tariff increase on the|Y
01|235213|2|3|importation of this product.  Any surcharge will be|Y
01|235213|2|4|disclosed prior to acceptance of an order.|Y
01|235214|2|1|A tariff surcharge may be added to this quotation in|Y
01|235214|2|2|the event of a sustained tariff increase on the|Y
01|235214|2|3|importation of this product.  Any surcharge will be|Y
01|235214|2|4|disclosed prior to acceptance of an order.|Y
01|235215|2|1|A tariff surcharge may be added to this quotation in|Y
01|235215|2|2|the event of a sustained tariff increase on the|Y
01|235215|2|3|importation of this product.  Any surcharge will be|Y
01|235215|2|4|disclosed prior to acceptance of an order.|Y
01|235216|1|1|w/ PS-123-AIR installed at factory|Y
01|235216|2|1|Installed on NC5-46-SK6C-90 at factory|Y
01|235216|3|1|A tariff surcharge may be added to this quotation in|Y
01|235216|3|2|the event of a sustained tariff increase on the|Y
01|235216|3|3|importation of this product.  Any surcharge will be|Y
01|235216|3|4|disclosed prior to acceptance of an order.|Y
01|235217|2|1|A tariff surcharge may be added to this quotation in|Y
01|235217|2|2|the event of a sustained tariff increase on the|Y
01|235217|2|3|importation of this product.  Any surcharge will be|Y
01|235217|2|4|disclosed prior to acceptance of an order.|Y
01|235218|3|1|A tariff surcharge may be added to this quotation in|Y
01|235218|3|2|the event of a sustained tariff increase on the|Y
01|235218|3|3|importation of this product.  Any surcharge will be|Y
01|235218|3|4|disclosed prior to acceptance of an order.|Y
01|235219|40|1|A tariff surcharge of 8% will be added to every order|Y
01|235219|40|2|placed after September 1st 2025(until further notice).|Y
01|235219|40|3|This surcharge will be acknowledged upon acceptance|Y
01|235219|40|4|of every order.|Y
01|235220|3|1|A tariff surcharge may be added to this quotation in|Y
01|235220|3|2|the event of a sustained tariff increase on the|Y
01|235220|3|3|importation of this product.  Any surcharge will be|Y
01|235220|3|4|disclosed prior to acceptance of an order.|Y
01|235221|3|1|A tariff surcharge may be added to this quotation in|Y
01|235221|3|2|the event of a sustained tariff increase on the|Y
01|235221|3|3|importation of this product.  Any surcharge will be|Y
01|235221|3|4|disclosed prior to acceptance of an order.|Y
01|235222|5|1|A tariff surcharge may be added to this quotation in|Y
01|235222|5|2|the event of a sustained tariff increase on the|Y
01|235222|5|3|importation of this product.  Any surcharge will be|Y
01|235222|5|4|disclosed prior to acceptance of an order.|Y
01|235223|2|1|A tariff surcharge may be added to this quotation in|Y
01|235223|2|2|the event of a sustained tariff increase on the|Y
01|235223|2|3|importation of this product.  Any surcharge will be|Y
01|235223|2|4|disclosed prior to acceptance of an order.|Y
01|235224|8|1|A tariff surcharge may be added to this quotation in|Y
01|235224|8|2|the event of a sustained tariff increase on the|Y
01|235224|8|3|importation of this product.  Any surcharge will be|Y
01|235224|8|4|disclosed prior to acceptance of an order.|Y
01|235225|2|1|A tariff surcharge may be added to this quotation in|Y
01|235225|2|2|the event of a sustained tariff increase on the|Y
01|235225|2|3|importation of this product.  Any surcharge will be|Y
01|235225|2|4|disclosed prior to acceptance of an order.|Y
01|235226|2|1|A tariff surcharge may be added to this quotation in|Y
01|235226|2|2|the event of a sustained tariff increase on the|Y
01|235226|2|3|importation of this product.  Any surcharge will be|Y
01|235226|2|4|disclosed prior to acceptance of an order.|Y
01|235227|2|1|Please note additional 20% applied per overstock promo.|Y
01|235227|2|2|Once PO/order issued these cannot be cancelled or|Y
01|235227|2|3|returned. These will need to be requoted upon stock|Y
01|235227|2|4|depletion.|Y
01|235227|3|1|A tariff surcharge may be added to this quotation in|Y
01|235227|3|2|the event of a sustained tariff increase on the|Y
01|235227|3|3|importation of this product.  Any surcharge will be|Y
01|235227|3|4|disclosed prior to acceptance of an order.|Y
01|235228|1|1|RGA#TOR-62100/|Y
01|235228|1|2|Repair of MBT40-C1-70|Y
01|235228|5|1|A tariff surcharge may be added to this quotation in|Y
01|235228|5|2|the event of a sustained tariff increase on the|Y
01|235228|5|3|importation of this product.  Any surcharge will be|Y
01|235228|5|4|disclosed prior to acceptance of an order.|Y
01|235229|3|1|A tariff surcharge may be added to this quotation in|Y
01|235229|3|2|the event of a sustained tariff increase on the|Y
01|235229|3|3|importation of this product.  Any surcharge will be|Y
01|235229|3|4|disclosed prior to acceptance of an order.|Y
01|235230|1|1|*To be installed w/ PS-N46E @ Factory|Y
01|235230|2|1|*To be installed w/ NC5-46-SK16C-120P @ Factory|Y
01|235230|3|1|*To be installed w/ PS-N46E @ Factory|Y
01|235230|4|1|*To be installed w/ NC5-46-SK16C-90P @ factory|Y
01|235230|6|1|*To be installed w/ PS-N46E @ Factory|Y
01|235230|7|1|*To be installed w/ NC5-46-C20-80 @ Factory|Y
01|235230|10|1|*To be installed w/ PS-123E @ Factory|Y
01|235230|11|1|*To be installed w/ NC5-46-SK10C-90 @ Factory|Y
01|235230|15|1|*To be installed w/ PS-N46E @ Factory|Y
01|235230|16|1|*To be installed w/ S-NC5-46-SK16C-90B @ Factory|Y
01|235230|20|1|*To be installed w/ PS-123E @ Factory|Y
01|235230|21|1|*To be installed w/ NC5-46-C25-90 @ Factory|Y
01|235230|23|1|A tariff surcharge may be added to this quotation in|Y
01|235230|23|2|the event of a sustained tariff increase on the|Y
01|235230|23|3|importation of this product.  Any surcharge will be|Y
01|235230|23|4|disclosed prior to acceptance of an order.|Y
01|235231|2|1|A tariff surcharge may be added to this quotation in|Y
01|235231|2|2|the event of a sustained tariff increase on the|Y
01|235231|2|3|importation of this product.  Any surcharge will be|Y
01|235231|2|4|disclosed prior to acceptance of an order.|Y
01|235232|2|1|A tariff surcharge may be added to this quotation in|Y
01|235232|2|2|the event of a sustained tariff increase on the|Y
01|235232|2|3|importation of this product.  Any surcharge will be|Y
01|235232|2|4|disclosed prior to acceptance of an order.|Y
01|235233|6|1|A tariff surcharge may be added to this quotation in|Y
01|235233|6|2|the event of a sustained tariff increase on the|Y
01|235233|6|3|importation of this product.  Any surcharge will be|Y
01|235233|6|4|disclosed prior to acceptance of an order.|Y
01|235234|3|1|A tariff surcharge may be added to this quotation in|Y
01|235234|3|2|the event of a sustained tariff increase on the|Y
01|235234|3|3|importation of this product.  Any surcharge will be|Y
01|235234|3|4|disclosed prior to acceptance of an order.|Y
01|235235|2|1|A tariff surcharge may be added to this quotation in|Y
01|235235|2|2|the event of a sustained tariff increase on the|Y
01|235235|2|3|importation of this product.  Any surcharge will be|Y
01|235235|2|4|disclosed prior to acceptance of an order.|Y
01|235236|2|1|A tariff surcharge may be added to this quotation in|Y
01|235236|2|2|the event of a sustained tariff increase on the|Y
01|235236|2|3|importation of this product.  Any surcharge will be|Y
01|235236|2|4|disclosed prior to acceptance of an order.|Y
01|235237|2|1|A tariff surcharge may be added to this quotation in|Y
01|235237|2|2|the event of a sustained tariff increase on the|Y
01|235237|2|3|importation of this product.  Any surcharge will be|Y
01|235237|2|4|disclosed prior to acceptance of an order.|Y
01|235238|2|1|Please note additional 20% applied per overstock promo.|Y
01|235238|2|2|Once PO/order issued these cannot be cancelled or|Y
01|235238|2|3|returned. This will need to be requoted upon stock|Y
01|235238|2|4|depletion.|Y
01|235238|6|1|**NET Price**  MINIMUM ORDER QTY 20 PCS|Y
01|235238|6|2|Lead Time: Please allow 1-2 Wks design time. Mfg +|Y
01|235238|6|3|Shipping is 22 Weeks after approval drawing is signed|Y
01|235238|6|4|by the customer.|Y
01|235238|6|5|**Cannot be cancelled or returned**|Y
01|235238|9|1|A tariff surcharge may be added to this quotation in|Y
01|235238|9|2|the event of a sustained tariff increase on the|Y
01|235238|9|3|importation of this product.  Any surcharge will be|Y
01|235238|9|4|disclosed prior to acceptance of an order.|Y
01|235239|2|1|A tariff surcharge may be added to this quotation in|Y
01|235239|2|2|the event of a sustained tariff increase on the|Y
01|235239|2|3|importation of this product.  Any surcharge will be|Y
01|235239|2|4|disclosed prior to acceptance of an order.|Y
01|235240|3|1|A tariff surcharge may be added to this quotation in|Y
01|235240|3|2|the event of a sustained tariff increase on the|Y
01|235240|3|3|importation of this product.  Any surcharge will be|Y
01|235240|3|4|disclosed prior to acceptance of an order.|Y
01|235241|2|1|A tariff surcharge may be added to this quotation in|Y
01|235241|2|2|the event of a sustained tariff increase on the|Y
01|235241|2|3|importation of this product.  Any surcharge will be|Y
01|235241|2|4|disclosed prior to acceptance of an order.|Y
01|235242|6|1|A tariff surcharge may be added to this quotation in|Y
01|235242|6|2|the event of a sustained tariff increase on the|Y
01|235242|6|3|importation of this product.  Any surcharge will be|Y
01|235242|6|4|disclosed prior to acceptance of an order.|Y
01|235243|16|1|A tariff surcharge may be added to this quotation in|Y
01|235243|16|2|the event of a sustained tariff increase on the|Y
01|235243|16|3|importation of this product.  Any surcharge will be|Y
01|235243|16|4|disclosed prior to acceptance of an order.|Y
01|235245|1|1|Quoted at NET pricing|Y
01|235245|2|1|Item is non-standard stock. Once a PO has been received|Y
01|235245|2|2|it can not be cancelled or returned.|Y
01|235245|5|1|A tariff surcharge may be added to this quotation in|Y
01|235245|5|2|the event of a sustained tariff increase on the|Y
01|235245|5|3|importation of this product.  Any surcharge will be|Y
01|235245|5|4|disclosed prior to acceptance of an order.|Y
01|235246|4|1|A tariff surcharge may be added to this quotation in|Y
01|235246|4|2|the event of a sustained tariff increase on the|Y
01|235246|4|3|importation of this product.  Any surcharge will be|Y
01|235246|4|4|disclosed prior to acceptance of an order.|Y
01|235247|1|1|QUANTITY BREAK NET PRICING:|Y
01|235247|32|1|A tariff surcharge may be added to this quotation in|Y
01|235247|32|2|the event of a sustained tariff increase on the|Y
01|235247|32|3|importation of this product.  Any surcharge will be|Y
01|235247|32|4|disclosed prior to acceptance of an order.|Y
01|235248|2|1|A tariff surcharge may be added to this quotation in|Y
01|235248|2|2|the event of a sustained tariff increase on the|Y
01|235248|2|3|importation of this product.  Any surcharge will be|Y
01|235248|2|4|disclosed prior to acceptance of an order.|Y
01|235249|2|1|A tariff surcharge may be added to this quotation in|Y
01|235249|2|2|the event of a sustained tariff increase on the|Y
01|235249|2|3|importation of this product.  Any surcharge will be|Y
01|235249|2|4|disclosed prior to acceptance of an order.|Y
01|235250|2|1|A tariff surcharge may be added to this quotation in|Y
01|235250|2|2|the event of a sustained tariff increase on the|Y
01|235250|2|3|importation of this product.  Any surcharge will be|Y
01|235250|2|4|disclosed prior to acceptance of an order.|Y
01|235251|2|1|A tariff surcharge may be added to this quotation in|Y
01|235251|2|2|the event of a sustained tariff increase on the|Y
01|235251|2|3|importation of this product.  Any surcharge will be|Y
01|235251|2|4|disclosed prior to acceptance of an order.|Y
01|235252|3|1|A tariff surcharge may be added to this quotation in|Y
01|235252|3|2|the event of a sustained tariff increase on the|Y
01|235252|3|3|importation of this product.  Any surcharge will be|Y
01|235252|3|4|disclosed prior to acceptance of an order.|Y
01|235253|2|1|A tariff surcharge may be added to this quotation in|Y
01|235253|2|2|the event of a sustained tariff increase on the|Y
01|235253|2|3|importation of this product.  Any surcharge will be|Y
01|235253|2|4|disclosed prior to acceptance of an order.|Y
01|235254|2|1|A tariff surcharge may be added to this quotation in|Y
01|235254|2|2|the event of a sustained tariff increase on the|Y
01|235254|2|3|importation of this product.  Any surcharge will be|Y
01|235254|2|4|disclosed prior to acceptance of an order.|Y
01|235255|2|1|A tariff surcharge may be added to this quotation in|Y
01|235255|2|2|the event of a sustained tariff increase on the|Y
01|235255|2|3|importation of this product.  Any surcharge will be|Y
01|235255|2|4|disclosed prior to acceptance of an order.|Y
01|235256|1|1|MZMP46-ER32Z-HS-ICE|Y
01|235256|1|2|VDI40 ER32 Internal/external coolant|Y
01|235256|29|1|A tariff surcharge may be added to this quotation in|Y
01|235256|29|2|the event of a sustained tariff increase on the|Y
01|235256|29|3|importation of this product.  Any surcharge will be|Y
01|235256|29|4|disclosed prior to acceptance of an order.|Y
01|235257|2|1|A tariff surcharge may be added to this quotation in|Y
01|235257|2|2|the event of a sustained tariff increase on the|Y
01|235257|2|3|importation of this product.  Any surcharge will be|Y
01|235257|2|4|disclosed prior to acceptance of an order.|Y
01|235258|3|1|A tariff surcharge may be added to this quotation in|Y
01|235258|3|2|the event of a sustained tariff increase on the|Y
01|235258|3|3|importation of this product.  Any surcharge will be|Y
01|235258|3|4|disclosed prior to acceptance of an order.|Y
01|235259|3|1|A tariff surcharge may be added to this quotation in|Y
01|235259|3|2|the event of a sustained tariff increase on the|Y
01|235259|3|3|importation of this product.  Any surcharge will be|Y
01|235259|3|4|disclosed prior to acceptance of an order.|Y
01|235260|4|1|A tariff surcharge may be added to this quotation in|Y
01|235260|4|2|the event of a sustained tariff increase on the|Y
01|235260|4|3|importation of this product.  Any surcharge will be|Y
01|235260|4|4|disclosed prior to acceptance of an order.|Y
01|235261|1|1|Please allow 12 weeks for manufacturing & delivery|Y
01|235261|1|2|time upon receival of signed approval drawing. These|Y
01|235261|1|3|are considered special and have been quoted at special|Y
01|235261|1|4|net price. Once PO/order issued these cannot be|Y
01|235261|1|5|cancelled or returned.|Y
01|235261|8|1|A tariff surcharge may be added to this quotation in|Y
01|235261|8|2|the event of a sustained tariff increase on the|Y
01|235261|8|3|importation of this product.  Any surcharge will be|Y
01|235261|8|4|disclosed prior to acceptance of an order.|Y
01|235262|2|1|A tariff surcharge may be added to this quotation in|Y
01|235262|2|2|the event of a sustained tariff increase on the|Y
01|235262|2|3|importation of this product.  Any surcharge will be|Y
01|235262|2|4|disclosed prior to acceptance of an order.|Y
01|235263|2|1|A tariff surcharge may be added to this quotation in|Y
01|235263|2|2|the event of a sustained tariff increase on the|Y
01|235263|2|3|importation of this product.  Any surcharge will be|Y
01|235263|2|4|disclosed prior to acceptance of an order.|Y
01|235264|14|1|A tariff surcharge may be added to this quotation in|Y
01|235264|14|2|the event of a sustained tariff increase on the|Y
01|235264|14|3|importation of this product.  Any surcharge will be|Y
01|235264|14|4|disclosed prior to acceptance of an order.|Y
01|235265|7|1|A tariff surcharge may be added to this quotation in|Y
01|235265|7|2|the event of a sustained tariff increase on the|Y
01|235265|7|3|importation of this product.  Any surcharge will be|Y
01|235265|7|4|disclosed prior to acceptance of an order.|Y
01|235266|1|1|IM136058|Y
01|235266|2|1|IM175950|Y
01|235266|3|1|A tariff surcharge may be added to this quotation in|Y
01|235266|3|2|the event of a sustained tariff increase on the|Y
01|235266|3|3|importation of this product.  Any surcharge will be|Y
01|235266|3|4|disclosed prior to acceptance of an order.|Y
01|235267|2|1|A tariff surcharge may be added to this quotation in|Y
01|235267|2|2|the event of a sustained tariff increase on the|Y
01|235267|2|3|importation of this product.  Any surcharge will be|Y
01|235267|2|4|disclosed prior to acceptance of an order.|Y
01|235269|2|1|A tariff surcharge may be added to this quotation in|Y
01|235269|2|2|the event of a sustained tariff increase on the|Y
01|235269|2|3|importation of this product.  Any surcharge will be|Y
01|235269|2|4|disclosed prior to acceptance of an order.|Y
01|235270|2|1|A tariff surcharge may be added to this quotation in|Y
01|235270|2|2|the event of a sustained tariff increase on the|Y
01|235270|2|3|importation of this product.  Any surcharge will be|Y
01|235270|2|4|disclosed prior to acceptance of an order.|Y
01|235271|9|1|A tariff surcharge may be added to this quotation in|Y
01|235271|9|2|the event of a sustained tariff increase on the|Y
01|235271|9|3|importation of this product.  Any surcharge will be|Y
01|235271|9|4|disclosed prior to acceptance of an order.|Y
01|235272|6|1|A tariff surcharge may be added to this quotation in|Y
01|235272|6|2|the event of a sustained tariff increase on the|Y
01|235272|6|3|importation of this product.  Any surcharge will be|Y
01|235272|6|4|disclosed prior to acceptance of an order.|Y
01|235273|2|1|A tariff surcharge may be added to this quotation in|Y
01|235273|2|2|the event of a sustained tariff increase on the|Y
01|235273|2|3|importation of this product.  Any surcharge will be|Y
01|235273|2|4|disclosed prior to acceptance of an order.|Y
01|235274|2|1|A tariff surcharge may be added to this quotation in|Y
01|235274|2|2|the event of a sustained tariff increase on the|Y
01|235274|2|3|importation of this product.  Any surcharge will be|Y
01|235274|2|4|disclosed prior to acceptance of an order.|Y
01|235275|2|1|A tariff surcharge may be added to this quotation in|Y
01|235275|2|2|the event of a sustained tariff increase on the|Y
01|235275|2|3|importation of this product.  Any surcharge will be|Y
01|235275|2|4|disclosed prior to acceptance of an order.|Y
01|235276|1|1|Please note this is considered special and has been|Y
01|235276|1|2|quoted at special net price. Once PO/order is issued|Y
01|235276|1|3|these cannot be cancelled or returned.|Y
01|235276|2|1|A tariff surcharge may be added to this quotation in|Y
01|235276|2|2|the event of a sustained tariff increase on the|Y
01|235276|2|3|importation of this product.  Any surcharge will be|Y
01|235276|2|4|disclosed prior to acceptance of an order.|Y
01|235277|2|1|A tariff surcharge may be added to this quotation in|Y
01|235277|2|2|the event of a sustained tariff increase on the|Y
01|235277|2|3|importation of this product.  Any surcharge will be|Y
01|235277|2|4|disclosed prior to acceptance of an order.|Y
01|235278|2|1|A tariff surcharge may be added to this quotation in|Y
01|235278|2|2|the event of a sustained tariff increase on the|Y
01|235278|2|3|importation of this product.  Any surcharge will be|Y
01|235278|2|4|disclosed prior to acceptance of an order.|Y
01|235279|2|1|A tariff surcharge may be added to this quotation in|Y
01|235279|2|2|the event of a sustained tariff increase on the|Y
01|235279|2|3|importation of this product.  Any surcharge will be|Y
01|235279|2|4|disclosed prior to acceptance of an order.|Y
01|235280|2|1|A tariff surcharge may be added to this quotation in|Y
01|235280|2|2|the event of a sustained tariff increase on the|Y
01|235280|2|3|importation of this product.  Any surcharge will be|Y
01|235280|2|4|disclosed prior to acceptance of an order.|Y
01|235281|3|1|A tariff surcharge may be added to this quotation in|Y
01|235281|3|2|the event of a sustained tariff increase on the|Y
01|235281|3|3|importation of this product.  Any surcharge will be|Y
01|235281|3|4|disclosed prior to acceptance of an order.|Y
01|235283|5|1|A tariff surcharge may be added to this quotation in|Y
01|235283|5|2|the event of a sustained tariff increase on the|Y
01|235283|5|3|importation of this product.  Any surcharge will be|Y
01|235283|5|4|disclosed prior to acceptance of an order.|Y
01|235284|2|1|A tariff surcharge may be added to this quotation in|Y
01|235284|2|2|the event of a sustained tariff increase on the|Y
01|235284|2|3|importation of this product.  Any surcharge will be|Y
01|235284|2|4|disclosed prior to acceptance of an order.|Y
01|235285|1|1|IT50-SMS22-120|Y
01|235285|2|1|A tariff surcharge may be added to this quotation in|Y
01|235285|2|2|the event of a sustained tariff increase on the|Y
01|235285|2|3|importation of this product.  Any surcharge will be|Y
01|235285|2|4|disclosed prior to acceptance of an order.|Y
01|235286|3|1|A tariff surcharge may be added to this quotation in|Y
01|235286|3|2|the event of a sustained tariff increase on the|Y
01|235286|3|3|importation of this product.  Any surcharge will be|Y
01|235286|3|4|disclosed prior to acceptance of an order.|Y
01|235287|2|1|A tariff surcharge may be added to this quotation in|Y
01|235287|2|2|the event of a sustained tariff increase on the|Y
01|235287|2|3|importation of this product.  Any surcharge will be|Y
01|235287|2|4|disclosed prior to acceptance of an order.|Y
01|235288|3|1|A tariff surcharge may be added to this quotation in|Y
01|235288|3|2|the event of a sustained tariff increase on the|Y
01|235288|3|3|importation of this product.  Any surcharge will be|Y
01|235288|3|4|disclosed prior to acceptance of an order.|Y
01|235289|3|1|A tariff surcharge may be added to this quotation in|Y
01|235289|3|2|the event of a sustained tariff increase on the|Y
01|235289|3|3|importation of this product.  Any surcharge will be|Y
01|235289|3|4|disclosed prior to acceptance of an order.|Y
01|235290|2|1|A tariff surcharge may be added to this quotation in|Y
01|235290|2|2|the event of a sustained tariff increase on the|Y
01|235290|2|3|importation of this product.  Any surcharge will be|Y
01|235290|2|4|disclosed prior to acceptance of an order.|Y
01|235291|12|1|A tariff surcharge may be added to this quotation in|Y
01|235291|12|2|the event of a sustained tariff increase on the|Y
01|235291|12|3|importation of this product.  Any surcharge will be|Y
01|235291|12|4|disclosed prior to acceptance of an order.|Y
01|235292|2|1|A tariff surcharge may be added to this quotation in|Y
01|235292|2|2|the event of a sustained tariff increase on the|Y
01|235292|2|3|importation of this product.  Any surcharge will be|Y
01|235292|2|4|disclosed prior to acceptance of an order.|Y
01|235293|2|1|A tariff surcharge may be added to this quotation in|Y
01|235293|2|2|the event of a sustained tariff increase on the|Y
01|235293|2|3|importation of this product.  Any surcharge will be|Y
01|235293|2|4|disclosed prior to acceptance of an order.|Y
01|235294|1|1|**This item is special non-standard stock. Cannot be|Y
01|235294|1|2|cancelled or returned**|Y
01|235294|2|1|Final Part# HSK63A-Z24-140 **NET Price**|Y
01|235294|2|2|**This item is considered special - cannot be cancelled|Y
01|235294|2|3|or returned**|Y
01|235294|3|1|**This item is special non-standard stock. Cannot be|Y
01|235294|3|2|cancelled or returned|Y
01|235294|8|1|A tariff surcharge may be added to this quotation in|Y
01|235294|8|2|the event of a sustained tariff increase on the|Y
01|235294|8|3|importation of this product.  Any surcharge will be|Y
01|235294|8|4|disclosed prior to acceptance of an order.|Y
01|235295|2|1|A tariff surcharge may be added to this quotation in|Y
01|235295|2|2|the event of a sustained tariff increase on the|Y
01|235295|2|3|importation of this product.  Any surcharge will be|Y
01|235295|2|4|disclosed prior to acceptance of an order.|Y
01|235296|19|1|A tariff surcharge may be added to this quotation in|Y
01|235296|19|2|the event of a sustained tariff increase on the|Y
01|235296|19|3|importation of this product.  Any surcharge will be|Y
01|235296|19|4|disclosed prior to acceptance of an order.|Y
01|235297|2|1|A tariff surcharge may be added to this quotation in|Y
01|235297|2|2|the event of a sustained tariff increase on the|Y
01|235297|2|3|importation of this product.  Any surcharge will be|Y
01|235297|2|4|disclosed prior to acceptance of an order.|Y
01|235298|6|1|PRE-PART-12TRE|Y
01|235298|6|2|Includes: 2D Scanner 1000 Data matrix labels Software|Y
01|235298|8|1|A tariff surcharge may be added to this quotation in|Y
01|235298|8|2|the event of a sustained tariff increase on the|Y
01|235298|8|3|importation of this product.  Any surcharge will be|Y
01|235298|8|4|disclosed prior to acceptance of an order.|Y
01|235299|2|1|A tariff surcharge may be added to this quotation in|Y
01|235299|2|2|the event of a sustained tariff increase on the|Y
01|235299|2|3|importation of this product.  Any surcharge will be|Y
01|235299|2|4|disclosed prior to acceptance of an order.|Y
01|235300|6|1|A tariff surcharge may be added to this quotation in|Y
01|235300|6|2|the event of a sustained tariff increase on the|Y
01|235300|6|3|importation of this product.  Any surcharge will be|Y
01|235300|6|4|disclosed prior to acceptance of an order.|Y
01|235301|3|1|A tariff surcharge may be added to this quotation in|Y
01|235301|3|2|the event of a sustained tariff increase on the|Y
01|235301|3|3|importation of this product.  Any surcharge will be|Y
01|235301|3|4|disclosed prior to acceptance of an order.|Y
01|235302|2|1|A tariff surcharge may be added to this quotation in|Y
01|235302|2|2|the event of a sustained tariff increase on the|Y
01|235302|2|3|importation of this product.  Any surcharge will be|Y
01|235302|2|4|disclosed prior to acceptance of an order.|Y
01|235303|3|1|A tariff surcharge may be added to this quotation in|Y
01|235303|3|2|the event of a sustained tariff increase on the|Y
01|235303|3|3|importation of this product.  Any surcharge will be|Y
01|235303|3|4|disclosed prior to acceptance of an order.|Y
01|235304|3|1|A tariff surcharge may be added to this quotation in|Y
01|235304|3|2|the event of a sustained tariff increase on the|Y
01|235304|3|3|importation of this product.  Any surcharge will be|Y
01|235304|3|4|disclosed prior to acceptance of an order.|Y
01|235305|2|1|A tariff surcharge may be added to this quotation in|Y
01|235305|2|2|the event of a sustained tariff increase on the|Y
01|235305|2|3|importation of this product.  Any surcharge will be|Y
01|235305|2|4|disclosed prior to acceptance of an order.|Y
01|235306|2|1|A tariff surcharge may be added to this quotation in|Y
01|235306|2|2|the event of a sustained tariff increase on the|Y
01|235306|2|3|importation of this product.  Any surcharge will be|Y
01|235306|2|4|disclosed prior to acceptance of an order.|Y
01|235307|2|1|A tariff surcharge may be added to this quotation in|Y
01|235307|2|2|the event of a sustained tariff increase on the|Y
01|235307|2|3|importation of this product.  Any surcharge will be|Y
01|235307|2|4|disclosed prior to acceptance of an order.|Y
01|235308|2|1|A tariff surcharge may be added to this quotation in|Y
01|235308|2|2|the event of a sustained tariff increase on the|Y
01|235308|2|3|importation of this product.  Any surcharge will be|Y
01|235308|2|4|disclosed prior to acceptance of an order.|Y
01|235309|5|1|A tariff surcharge may be added to this quotation in|Y
01|235309|5|2|the event of a sustained tariff increase on the|Y
01|235309|5|3|importation of this product.  Any surcharge will be|Y
01|235309|5|4|disclosed prior to acceptance of an order.|Y
01|235310|5|1|A tariff surcharge may be added to this quotation in|Y
01|235310|5|2|the event of a sustained tariff increase on the|Y
01|235310|5|3|importation of this product.  Any surcharge will be|Y
01|235310|5|4|disclosed prior to acceptance of an order.|Y
01|235311|3|1|A tariff surcharge may be added to this quotation in|Y
01|235311|3|2|the event of a sustained tariff increase on the|Y
01|235311|3|3|importation of this product.  Any surcharge will be|Y
01|235311|3|4|disclosed prior to acceptance of an order.|Y
01|235312|2|1|A tariff surcharge may be added to this quotation in|Y
01|235312|2|2|the event of a sustained tariff increase on the|Y
01|235312|2|3|importation of this product.  Any surcharge will be|Y
01|235312|2|4|disclosed prior to acceptance of an order.|Y
01|235313|7|1|A tariff surcharge may be added to this quotation in|Y
01|235313|7|2|the event of a sustained tariff increase on the|Y
01|235313|7|3|importation of this product.  Any surcharge will be|Y
01|235313|7|4|disclosed prior to acceptance of an order.|Y
01|235314|12|1|A tariff surcharge may be added to this quotation in|Y
01|235314|12|2|the event of a sustained tariff increase on the|Y
01|235314|12|3|importation of this product.  Any surcharge will be|Y
01|235314|12|4|disclosed prior to acceptance of an order.|Y
01|235315|2|1|A tariff surcharge may be added to this quotation in|Y
01|235315|2|2|the event of a sustained tariff increase on the|Y
01|235315|2|3|importation of this product.  Any surcharge will be|Y
01|235315|2|4|disclosed prior to acceptance of an order.|Y
01|235316|7|1|A tariff surcharge may be added to this quotation in|Y
01|235316|7|2|the event of a sustained tariff increase on the|Y
01|235316|7|3|importation of this product.  Any surcharge will be|Y
01|235316|7|4|disclosed prior to acceptance of an order.|Y
01|235317|4|1|A tariff surcharge of 8% will be added to every order|Y
01|235317|4|2|placed after September 1st 2025(until further notice).|Y
01|235317|4|3|This surcharge will be acknowledged upon acceptance|Y
01|235317|4|4|of every order.|Y
01|235318|6|1|A tariff surcharge may be added to this quotation in|Y
01|235318|6|2|the event of a sustained tariff increase on the|Y
01|235318|6|3|importation of this product.  Any surcharge will be|Y
01|235318|6|4|disclosed prior to acceptance of an order.|Y
01|235319|6|1|A tariff surcharge may be added to this quotation in|Y
01|235319|6|2|the event of a sustained tariff increase on the|Y
01|235319|6|3|importation of this product.  Any surcharge will be|Y
01|235319|6|4|disclosed prior to acceptance of an order.|Y
01|235320|2|1|A tariff surcharge may be added to this quotation in|Y
01|235320|2|2|the event of a sustained tariff increase on the|Y
01|235320|2|3|importation of this product.  Any surcharge will be|Y
01|235320|2|4|disclosed prior to acceptance of an order.|Y
01|235321|1|1|HW-12C-HS-3S-Y4416-1|Y
01|235321|1|2|Net Price for Tungaloy|Y
01|235321|2|1|A tariff surcharge may be added to this quotation in|Y
01|235321|2|2|the event of a sustained tariff increase on the|Y
01|235321|2|3|importation of this product.  Any surcharge will be|Y
01|235321|2|4|disclosed prior to acceptance of an order.|Y
01|235322|21|1|A tariff surcharge may be added to this quotation in|Y
01|235322|21|2|the event of a sustained tariff increase on the|Y
01|235322|21|3|importation of this product.  Any surcharge will be|Y
01|235322|21|4|disclosed prior to acceptance of an order.|Y
01|235323|1|1|RGA#TOR-61985/|Y
01|235323|1|2|Repair of CAT40U-NX5-153 s/n: QC1F-037|Y
01|235323|4|1|A tariff surcharge may be added to this quotation in|Y
01|235323|4|2|the event of a sustained tariff increase on the|Y
01|235323|4|3|importation of this product.  Any surcharge will be|Y
01|235323|4|4|disclosed prior to acceptance of an order.|Y
01|235324|2|1|A tariff surcharge may be added to this quotation in|Y
01|235324|2|2|the event of a sustained tariff increase on the|Y
01|235324|2|3|importation of this product.  Any surcharge will be|Y
01|235324|2|4|disclosed prior to acceptance of an order.|Y
01|235325|8|1|A tariff surcharge may be added to this quotation in|Y
01|235325|8|2|the event of a sustained tariff increase on the|Y
01|235325|8|3|importation of this product.  Any surcharge will be|Y
01|235325|8|4|disclosed prior to acceptance of an order.|Y
01|235326|3|1|A tariff surcharge may be added to this quotation in|Y
01|235326|3|2|the event of a sustained tariff increase on the|Y
01|235326|3|3|importation of this product.  Any surcharge will be|Y
01|235326|3|4|disclosed prior to acceptance of an order.|Y
01|235327|14|1|A tariff surcharge may be added to this quotation in|Y
01|235327|14|2|the event of a sustained tariff increase on the|Y
01|235327|14|3|importation of this product.  Any surcharge will be|Y
01|235327|14|4|disclosed prior to acceptance of an order.|Y
01|235328|1|1|SPECIAL PRICING - NET PRICE - NO DISCOUNT|Y
01|235328|2|1|A tariff surcharge may be added to this quotation in|Y
01|235328|2|2|the event of a sustained tariff increase on the|Y
01|235328|2|3|importation of this product.  Any surcharge will be|Y
01|235328|2|4|disclosed prior to acceptance of an order.|Y
01|235329|2|1|A tariff surcharge may be added to this quotation in|Y
01|235329|2|2|the event of a sustained tariff increase on the|Y
01|235329|2|3|importation of this product.  Any surcharge will be|Y
01|235329|2|4|disclosed prior to acceptance of an order.|Y
01|235330|1|1|Additional 20% Overstock Promo discount applied.|Y
01|235330|1|2|This item cannot be cancelled or returned upon receipt|Y
01|235330|1|3|of a PO.|Y
01|235330|2|1|Overstock Promo discount applicable to above item only|Y
01|235330|3|1|LN to make block upon receipt of spindle dimensions|Y
01|235330|3|2|necessary for design.|Y
01|235330|3|3|**NET PRICE - Cannot be cancelled or returned**|Y
01|235330|4|1|A tariff surcharge may be added to this quotation in|Y
01|235330|4|2|the event of a sustained tariff increase on the|Y
01|235330|4|3|importation of this product.  Any surcharge will be|Y
01|235330|4|4|disclosed prior to acceptance of an order.|Y
01|235331|3|1|A tariff surcharge may be added to this quotation in|Y
01|235331|3|2|the event of a sustained tariff increase on the|Y
01|235331|3|3|importation of this product.  Any surcharge will be|Y
01|235331|3|4|disclosed prior to acceptance of an order.|Y
01|235332|2|1|A tariff surcharge may be added to this quotation in|Y
01|235332|2|2|the event of a sustained tariff increase on the|Y
01|235332|2|3|importation of this product.  Any surcharge will be|Y
01|235332|2|4|disclosed prior to acceptance of an order.|Y
01|235334|2|1|P/N: HSK80A-TESTBAR|Y
01|235334|3|1|A tariff surcharge may be added to this quotation in|Y
01|235334|3|2|the event of a sustained tariff increase on the|Y
01|235334|3|3|importation of this product.  Any surcharge will be|Y
01|235334|3|4|disclosed prior to acceptance of an order.|Y
01|235335|1|1|5 pieces ETA = 8/17 while quantities last.|Y
01|235335|1|2|1 piece ETA 4.5 mths mfg + + 1-2 weeks ship.|Y
01|235335|3|1|A tariff surcharge may be added to this quotation in|Y
01|235335|3|2|the event of a sustained tariff increase on the|Y
01|235335|3|3|importation of this product.  Any surcharge will be|Y
01|235335|3|4|disclosed prior to acceptance of an order.|Y
01|235336|2|1|A tariff surcharge may be added to this quotation in|Y
01|235336|2|2|the event of a sustained tariff increase on the|Y
01|235336|2|3|importation of this product.  Any surcharge will be|Y
01|235336|2|4|disclosed prior to acceptance of an order.|Y
01|235337|2|1|A tariff surcharge may be added to this quotation in|Y
01|235337|2|2|the event of a sustained tariff increase on the|Y
01|235337|2|3|importation of this product.  Any surcharge will be|Y
01|235337|2|4|disclosed prior to acceptance of an order.|Y
01|235338|2|1|A tariff surcharge may be added to this quotation in|Y
01|235338|2|2|the event of a sustained tariff increase on the|Y
01|235338|2|3|importation of this product.  Any surcharge will be|Y
01|235338|2|4|disclosed prior to acceptance of an order.|Y
01|235339|7|1|A tariff surcharge may be added to this quotation in|Y
01|235339|7|2|the event of a sustained tariff increase on the|Y
01|235339|7|3|importation of this product.  Any surcharge will be|Y
01|235339|7|4|disclosed prior to acceptance of an order.|Y
01|235340|2|1|A tariff surcharge may be added to this quotation in|Y
01|235340|2|2|the event of a sustained tariff increase on the|Y
01|235340|2|3|importation of this product.  Any surcharge will be|Y
01|235340|2|4|disclosed prior to acceptance of an order.|Y
01|235341|7|1|A tariff surcharge may be added to this quotation in|Y
01|235341|7|2|the event of a sustained tariff increase on the|Y
01|235341|7|3|importation of this product.  Any surcharge will be|Y
01|235341|7|4|disclosed prior to acceptance of an order.|Y
01|235342|4|1|A tariff surcharge may be added to this quotation in|Y
01|235342|4|2|the event of a sustained tariff increase on the|Y
01|235342|4|3|importation of this product.  Any surcharge will be|Y
01|235342|4|4|disclosed prior to acceptance of an order.|Y
01|235344|2|1|A tariff surcharge may be added to this quotation in|Y
01|235344|2|2|the event of a sustained tariff increase on the|Y
01|235344|2|3|importation of this product.  Any surcharge will be|Y
01|235344|2|4|disclosed prior to acceptance of an order.|Y
01|235345|2|1|A tariff surcharge may be added to this quotation in|Y
01|235345|2|2|the event of a sustained tariff increase on the|Y
01|235345|2|3|importation of this product.  Any surcharge will be|Y
01|235345|2|4|disclosed prior to acceptance of an order.|Y
01|235346|4|1|A tariff surcharge may be added to this quotation in|Y
01|235346|4|2|the event of a sustained tariff increase on the|Y
01|235346|4|3|importation of this product.  Any surcharge will be|Y
01|235346|4|4|disclosed prior to acceptance of an order.|Y
01|235347|7|1|A tariff surcharge may be added to this quotation in|Y
01|235347|7|2|the event of a sustained tariff increase on the|Y
01|235347|7|3|importation of this product.  Any surcharge will be|Y
01|235347|7|4|disclosed prior to acceptance of an order.|Y
01|235348|2|1|A tariff surcharge may be added to this quotation in|Y
01|235348|2|2|the event of a sustained tariff increase on the|Y
01|235348|2|3|importation of this product.  Any surcharge will be|Y
01|235348|2|4|disclosed prior to acceptance of an order.|Y
01|235349|15|1|A tariff surcharge may be added to this quotation in|Y
01|235349|15|2|the event of a sustained tariff increase on the|Y
01|235349|15|3|importation of this product.  Any surcharge will be|Y
01|235349|15|4|disclosed prior to acceptance of an order.|Y
01|235350|2|1|A tariff surcharge may be added to this quotation in|Y
01|235350|2|2|the event of a sustained tariff increase on the|Y
01|235350|2|3|importation of this product.  Any surcharge will be|Y
01|235350|2|4|disclosed prior to acceptance of an order.|Y
01|235351|12|1|A tariff surcharge may be added to this quotation in|Y
01|235351|12|2|the event of a sustained tariff increase on the|Y
01|235351|12|3|importation of this product.  Any surcharge will be|Y
01|235351|12|4|disclosed prior to acceptance of an order.|Y
01|235352|20|1|A tariff surcharge may be added to this quotation in|Y
01|235352|20|2|the event of a sustained tariff increase on the|Y
01|235352|20|3|importation of this product.  Any surcharge will be|Y
01|235352|20|4|disclosed prior to acceptance of an order.|Y
01|235353|2|1|A tariff surcharge may be added to this quotation in|Y
01|235353|2|2|the event of a sustained tariff increase on the|Y
01|235353|2|3|importation of this product.  Any surcharge will be|Y
01|235353|2|4|disclosed prior to acceptance of an order.|Y
01|235354|2|1|A tariff surcharge may be added to this quotation in|Y
01|235354|2|2|the event of a sustained tariff increase on the|Y
01|235354|2|3|importation of this product.  Any surcharge will be|Y
01|235354|2|4|disclosed prior to acceptance of an order.|Y
01|235355|7|1|A tariff surcharge may be added to this quotation in|Y
01|235355|7|2|the event of a sustained tariff increase on the|Y
01|235355|7|3|importation of this product.  Any surcharge will be|Y
01|235355|7|4|disclosed prior to acceptance of an order.|Y
01|235356|3|1|A tariff surcharge may be added to this quotation in|Y
01|235356|3|2|the event of a sustained tariff increase on the|Y
01|235356|3|3|importation of this product.  Any surcharge will be|Y
01|235356|3|4|disclosed prior to acceptance of an order.|Y
01|235357|4|1|A tariff surcharge may be added to this quotation in|Y
01|235357|4|2|the event of a sustained tariff increase on the|Y
01|235357|4|3|importation of this product.  Any surcharge will be|Y
01|235357|4|4|disclosed prior to acceptance of an order.|Y
01|235358|2|1|A tariff surcharge may be added to this quotation in|Y
01|235358|2|2|the event of a sustained tariff increase on the|Y
01|235358|2|3|importation of this product.  Any surcharge will be|Y
01|235358|2|4|disclosed prior to acceptance of an order.|Y
01|235359|2|1|A tariff surcharge may be added to this quotation in|Y
01|235359|2|2|the event of a sustained tariff increase on the|Y
01|235359|2|3|importation of this product.  Any surcharge will be|Y
01|235359|2|4|disclosed prior to acceptance of an order.|Y
01|235361|2|1|A tariff surcharge may be added to this quotation in|Y
01|235361|2|2|the event of a sustained tariff increase on the|Y
01|235361|2|3|importation of this product.  Any surcharge will be|Y
01|235361|2|4|disclosed prior to acceptance of an order.|Y
01|235362|22|1|A tariff surcharge may be added to this quotation in|Y
01|235362|22|2|the event of a sustained tariff increase on the|Y
01|235362|22|3|importation of this product.  Any surcharge will be|Y
01|235362|22|4|disclosed prior to acceptance of an order.|Y
01|235363|4|1|A tariff surcharge may be added to this quotation in|Y
01|235363|4|2|the event of a sustained tariff increase on the|Y
01|235363|4|3|importation of this product.  Any surcharge will be|Y
01|235363|4|4|disclosed prior to acceptance of an order.|Y
01|235364|2|1|A tariff surcharge may be added to this quotation in|Y
01|235364|2|2|the event of a sustained tariff increase on the|Y
01|235364|2|3|importation of this product.  Any surcharge will be|Y
01|235364|2|4|disclosed prior to acceptance of an order.|Y
01|235365|5|1|A tariff surcharge may be added to this quotation in|Y
01|235365|5|2|the event of a sustained tariff increase on the|Y
01|235365|5|3|importation of this product.  Any surcharge will be|Y
01|235365|5|4|disclosed prior to acceptance of an order.|Y
01|235366|2|1|A tariff surcharge may be added to this quotation in|Y
01|235366|2|2|the event of a sustained tariff increase on the|Y
01|235366|2|3|importation of this product.  Any surcharge will be|Y
01|235366|2|4|disclosed prior to acceptance of an order.|Y
01|235367|2|1|A tariff surcharge may be added to this quotation in|Y
01|235367|2|2|the event of a sustained tariff increase on the|Y
01|235367|2|3|importation of this product.  Any surcharge will be|Y
01|235367|2|4|disclosed prior to acceptance of an order.|Y
01|235368|1|1|**This item is special non-standard stock. Cannot be|Y
01|235368|1|2|cancelled or returned**|Y
01|235368|2|1|Final Part# HSK63A-Z24-140 **NET Price**|Y
01|235368|2|2|**This item is considered special - cannot be cancelled|Y
01|235368|2|3|or returned**|Y
01|235368|3|1|A tariff surcharge may be added to this quotation in|Y
01|235368|3|2|the event of a sustained tariff increase on the|Y
01|235368|3|3|importation of this product.  Any surcharge will be|Y
01|235368|3|4|disclosed prior to acceptance of an order.|Y
01|235369|4|1|A tariff surcharge may be added to this quotation in|Y
01|235369|4|2|the event of a sustained tariff increase on the|Y
01|235369|4|3|importation of this product.  Any surcharge will be|Y
01|235369|4|4|disclosed prior to acceptance of an order.|Y
01|235370|22|1|A tariff surcharge may be added to this quotation in|Y
01|235370|22|2|the event of a sustained tariff increase on the|Y
01|235370|22|3|importation of this product.  Any surcharge will be|Y
01|235370|22|4|disclosed prior to acceptance of an order.|Y
01|235371|9|1|A tariff surcharge may be added to this quotation in|Y
01|235371|9|2|the event of a sustained tariff increase on the|Y
01|235371|9|3|importation of this product.  Any surcharge will be|Y
01|235371|9|4|disclosed prior to acceptance of an order.|Y
01|235372|1|1|E50 EXT SHANK 32|Y
01|235372|2|1|A tariff surcharge may be added to this quotation in|Y
01|235372|2|2|the event of a sustained tariff increase on the|Y
01|235372|2|3|importation of this product.  Any surcharge will be|Y
01|235372|2|4|disclosed prior to acceptance of an order.|Y
01|235373|5|1|A tariff surcharge may be added to this quotation in|Y
01|235373|5|2|the event of a sustained tariff increase on the|Y
01|235373|5|3|importation of this product.  Any surcharge will be|Y
01|235373|5|4|disclosed prior to acceptance of an order.|Y
01|235374|8|1|A tariff surcharge may be added to this quotation in|Y
01|235374|8|2|the event of a sustained tariff increase on the|Y
01|235374|8|3|importation of this product.  Any surcharge will be|Y
01|235374|8|4|disclosed prior to acceptance of an order.|Y
01|235375|1|1|**Used Unit - Cannot be cancelled or returned upon|Y
01|235375|1|2|receipt of a PO**|Y
01|235375|1|3|* ONE TIME PRICING FOR USED DEMO UNIT ONLY*|Y
01|235375|2|1|A tariff surcharge may be added to this quotation in|Y
01|235375|2|2|the event of a sustained tariff increase on the|Y
01|235375|2|3|importation of this product.  Any surcharge will be|Y
01|235375|2|4|disclosed prior to acceptance of an order.|Y
01|235376|3|1|A tariff surcharge may be added to this quotation in|Y
01|235376|3|2|the event of a sustained tariff increase on the|Y
01|235376|3|3|importation of this product.  Any surcharge will be|Y
01|235376|3|4|disclosed prior to acceptance of an order.|Y
01|235377|5|1|A tariff surcharge may be added to this quotation in|Y
01|235377|5|2|the event of a sustained tariff increase on the|Y
01|235377|5|3|importation of this product.  Any surcharge will be|Y
01|235377|5|4|disclosed prior to acceptance of an order.|Y
01|235378|7|1|A tariff surcharge may be added to this quotation in|Y
01|235378|7|2|the event of a sustained tariff increase on the|Y
01|235378|7|3|importation of this product.  Any surcharge will be|Y
01|235378|7|4|disclosed prior to acceptance of an order.|Y
01|235379|3|1|A tariff surcharge may be added to this quotation in|Y
01|235379|3|2|the event of a sustained tariff increase on the|Y
01|235379|3|3|importation of this product.  Any surcharge will be|Y
01|235379|3|4|disclosed prior to acceptance of an order.|Y
01|235380|5|1|A tariff surcharge may be added to this quotation in|Y
01|235380|5|2|the event of a sustained tariff increase on the|Y
01|235380|5|3|importation of this product.  Any surcharge will be|Y
01|235380|5|4|disclosed prior to acceptance of an order.|Y
01|235381|2|1|A tariff surcharge may be added to this quotation in|Y
01|235381|2|2|the event of a sustained tariff increase on the|Y
01|235381|2|3|importation of this product.  Any surcharge will be|Y
01|235381|2|4|disclosed prior to acceptance of an order.|Y
01|235382|3|1|A tariff surcharge may be added to this quotation in|Y
01|235382|3|2|the event of a sustained tariff increase on the|Y
01|235382|3|3|importation of this product.  Any surcharge will be|Y
01|235382|3|4|disclosed prior to acceptance of an order.|Y
01|235383|3|1|A tariff surcharge may be added to this quotation in|Y
01|235383|3|2|the event of a sustained tariff increase on the|Y
01|235383|3|3|importation of this product.  Any surcharge will be|Y
01|235383|3|4|disclosed prior to acceptance of an order.|Y
01|235384|2|1|A tariff surcharge may be added to this quotation in|Y
01|235384|2|2|the event of a sustained tariff increase on the|Y
01|235384|2|3|importation of this product.  Any surcharge will be|Y
01|235384|2|4|disclosed prior to acceptance of an order.|Y
01|235385|2|1|A tariff surcharge may be added to this quotation in|Y
01|235385|2|2|the event of a sustained tariff increase on the|Y
01|235385|2|3|importation of this product.  Any surcharge will be|Y
01|235385|2|4|disclosed prior to acceptance of an order.|Y
01|235386|10|4|requoted for price and availability.|Y
01|235386|11|1|Please note additional 20% applied per overstock promo.|Y
01|235386|11|2|Once PO/order issued these cannot be cancelled or|Y
01|235386|11|3|returned. Upon stock depletion these will need to be|Y
01|235386|11|4|requoted for price and availability.|Y
01|235386|23|1|A tariff surcharge of 8% will be added to every order|Y
01|235386|23|2|placed after September 1st 2025(until further notice).|Y
01|235386|23|3|This surcharge will be acknowledged upon acceptance|Y
01|235386|23|4|of every order.|Y
01|235387|2|1|A tariff surcharge may be added to this quotation in|Y
01|235387|2|2|the event of a sustained tariff increase on the|Y
01|235387|2|3|importation of this product.  Any surcharge will be|Y
01|235387|2|4|disclosed prior to acceptance of an order.|Y
01|235388|2|1|A tariff surcharge may be added to this quotation in|Y
01|235388|2|2|the event of a sustained tariff increase on the|Y
01|235388|2|3|importation of this product.  Any surcharge will be|Y
01|235388|2|4|disclosed prior to acceptance of an order.|Y
01|235389|2|1|A tariff surcharge may be added to this quotation in|Y
01|235389|2|2|the event of a sustained tariff increase on the|Y
01|235389|2|3|importation of this product.  Any surcharge will be|Y
01|235389|2|4|disclosed prior to acceptance of an order.|Y
01|235390|2|1|A tariff surcharge may be added to this quotation in|Y
01|235390|2|2|the event of a sustained tariff increase on the|Y
01|235390|2|3|importation of this product.  Any surcharge will be|Y
01|235390|2|4|disclosed prior to acceptance of an order.|Y
01|235391|3|1|A tariff surcharge may be added to this quotation in|Y
01|235391|3|2|the event of a sustained tariff increase on the|Y
01|235391|3|3|importation of this product.  Any surcharge will be|Y
01|235391|3|4|disclosed prior to acceptance of an order.|Y
01|235392|2|1|A tariff surcharge may be added to this quotation in|Y
01|235392|2|2|the event of a sustained tariff increase on the|Y
01|235392|2|3|importation of this product.  Any surcharge will be|Y
01|235392|2|4|disclosed prior to acceptance of an order.|Y
01|235393|3|1|A tariff surcharge may be added to this quotation in|Y
01|235393|3|2|the event of a sustained tariff increase on the|Y
01|235393|3|3|importation of this product.  Any surcharge will be|Y
01|235393|3|4|disclosed prior to acceptance of an order.|Y
01|235394|4|1|A tariff surcharge may be added to this quotation in|Y
01|235394|4|2|the event of a sustained tariff increase on the|Y
01|235394|4|3|importation of this product.  Any surcharge will be|Y
01|235394|4|4|disclosed prior to acceptance of an order.|Y
01|235395|2|1|A tariff surcharge may be added to this quotation in|Y
01|235395|2|2|the event of a sustained tariff increase on the|Y
01|235395|2|3|importation of this product.  Any surcharge will be|Y
01|235395|2|4|disclosed prior to acceptance of an order.|Y
01|235396|2|1|LN to make positioning block upon receipt of spindle|Y
01|235396|2|2|drawing.|Y
01|235396|4|1|*Special quoted at NET price|Y
01|235396|6|1|LN to make positioning block upon receipt of spindle|Y
01|235396|6|2|drawing.|Y
01|235396|7|1|A tariff surcharge may be added to this quotation in|Y
01|235396|7|2|the event of a sustained tariff increase on the|Y
01|235396|7|3|importation of this product.  Any surcharge will be|Y
01|235396|7|4|disclosed prior to acceptance of an order.|Y
01|235397|1|1|RGA#TAR-62030|Y
01|235397|1|2|CNC202FA-M/SN:1172|Y
01|235397|31|1|A tariff surcharge may be added to this quotation in|Y
01|235397|31|2|the event of a sustained tariff increase on the|Y
01|235397|31|3|importation of this product.  Any surcharge will be|Y
01|235397|31|4|disclosed prior to acceptance of an order.|Y
01|235398|2|1|A tariff surcharge may be added to this quotation in|Y
01|235398|2|2|the event of a sustained tariff increase on the|Y
01|235398|2|3|importation of this product.  Any surcharge will be|Y
01|235398|2|4|disclosed prior to acceptance of an order.|Y
01|235399|4|1|A tariff surcharge may be added to this quotation in|Y
01|235399|4|2|the event of a sustained tariff increase on the|Y
01|235399|4|3|importation of this product.  Any surcharge will be|Y
01|235399|4|4|disclosed prior to acceptance of an order.|Y
01|235400|2|1|A tariff surcharge may be added to this quotation in|Y
01|235400|2|2|the event of a sustained tariff increase on the|Y
01|235400|2|3|importation of this product.  Any surcharge will be|Y
01|235400|2|4|disclosed prior to acceptance of an order.|Y
01|235401|2|1|A tariff surcharge may be added to this quotation in|Y
01|235401|2|2|the event of a sustained tariff increase on the|Y
01|235401|2|3|importation of this product.  Any surcharge will be|Y
01|235401|2|4|disclosed prior to acceptance of an order.|Y
01|235402|6|1|A tariff surcharge may be added to this quotation in|Y
01|235402|6|2|the event of a sustained tariff increase on the|Y
01|235402|6|3|importation of this product.  Any surcharge will be|Y
01|235402|6|4|disclosed prior to acceptance of an order.|Y
01|235403|2|1|A tariff surcharge may be added to this quotation in|Y
01|235403|2|2|the event of a sustained tariff increase on the|Y
01|235403|2|3|importation of this product.  Any surcharge will be|Y
01|235403|2|4|disclosed prior to acceptance of an order.|Y
01|235404|2|1|A tariff surcharge may be added to this quotation in|Y
01|235404|2|2|the event of a sustained tariff increase on the|Y
01|235404|2|3|importation of this product.  Any surcharge will be|Y
01|235404|2|4|disclosed prior to acceptance of an order.|Y
01|235405|2|1|A tariff surcharge may be added to this quotation in|Y
01|235405|2|2|the event of a sustained tariff increase on the|Y
01|235405|2|3|importation of this product.  Any surcharge will be|Y
01|235405|2|4|disclosed prior to acceptance of an order.|Y
01|235406|5|1|A tariff surcharge may be added to this quotation in|Y
01|235406|5|2|the event of a sustained tariff increase on the|Y
01|235406|5|3|importation of this product.  Any surcharge will be|Y
01|235406|5|4|disclosed prior to acceptance of an order.|Y
01|235407|2|1|A tariff surcharge may be added to this quotation in|Y
01|235407|2|2|the event of a sustained tariff increase on the|Y
01|235407|2|3|importation of this product.  Any surcharge will be|Y
01|235407|2|4|disclosed prior to acceptance of an order.|Y
01|235408|1|1|INS Req'd:1005877/PTSol/Davis Machine(TX)|Y
01|235408|2|1|A tariff surcharge may be added to this quotation in|Y
01|235408|2|2|the event of a sustained tariff increase on the|Y
01|235408|2|3|importation of this product.  Any surcharge will be|Y
01|235408|2|4|disclosed prior to acceptance of an order.|Y
01|235409|2|1|A tariff surcharge may be added to this quotation in|Y
01|235409|2|2|the event of a sustained tariff increase on the|Y
01|235409|2|3|importation of this product.  Any surcharge will be|Y
01|235409|2|4|disclosed prior to acceptance of an order.|Y
01|235410|1|1|HSK50E-C20-95G|Y
01|235410|8|1|A tariff surcharge may be added to this quotation in|Y
01|235410|8|2|the event of a sustained tariff increase on the|Y
01|235410|8|3|importation of this product.  Any surcharge will be|Y
01|235410|8|4|disclosed prior to acceptance of an order.|Y
01|235412|2|1|A tariff surcharge may be added to this quotation in|Y
01|235412|2|2|the event of a sustained tariff increase on the|Y
01|235412|2|3|importation of this product.  Any surcharge will be|Y
01|235412|2|4|disclosed prior to acceptance of an order.|Y
01|235413|2|1|A tariff surcharge may be added to this quotation in|Y
01|235413|2|2|the event of a sustained tariff increase on the|Y
01|235413|2|3|importation of this product.  Any surcharge will be|Y
01|235413|2|4|disclosed prior to acceptance of an order.|Y
01|235414|2|1|A tariff surcharge may be added to this quotation in|Y
01|235414|2|2|the event of a sustained tariff increase on the|Y
01|235414|2|3|importation of this product.  Any surcharge will be|Y
01|235414|2|4|disclosed prior to acceptance of an order.|Y
01|235415|5|1|A tariff surcharge may be added to this quotation in|Y
01|235415|5|2|the event of a sustained tariff increase on the|Y
01|235415|5|3|importation of this product.  Any surcharge will be|Y
01|235415|5|4|disclosed prior to acceptance of an order.|Y
01|235416|6|1|A tariff surcharge may be added to this quotation in|Y
01|235416|6|2|the event of a sustained tariff increase on the|Y
01|235416|6|3|importation of this product.  Any surcharge will be|Y
01|235416|6|4|disclosed prior to acceptance of an order.|Y
01|235417|6|1|A tariff surcharge may be added to this quotation in|Y
01|235417|6|2|the event of a sustained tariff increase on the|Y
01|235417|6|3|importation of this product.  Any surcharge will be|Y
01|235417|6|4|disclosed prior to acceptance of an order.|Y
01|235420|2|1|A tariff surcharge may be added to this quotation in|Y
01|235420|2|2|the event of a sustained tariff increase on the|Y
01|235420|2|3|importation of this product.  Any surcharge will be|Y
01|235420|2|4|disclosed prior to acceptance of an order.|Y
01|235421|131|1|A tariff surcharge may be added to this quotation in|Y
01|235421|131|2|the event of a sustained tariff increase on the|Y
01|235421|131|3|importation of this product.  Any surcharge will be|Y
01|235421|131|4|disclosed prior to acceptance of an order.|Y
01|235422|1|1|Quoted at NET pricing|Y
01|235422|1|2|Pricing per Qty 50pcs. If changes submit for re-quote.|Y
01|235422|1|3|Non-cancellable/Non-returnable.|Y
01|235422|2|1|Quoted at NET pricing.|Y
01|235422|2|2|Non-cancellable/Non-returnable|Y
01|235422|6|1|A tariff surcharge may be added to this quotation in|Y
01|235422|6|2|the event of a sustained tariff increase on the|Y
01|235422|6|3|importation of this product.  Any surcharge will be|Y
01|235422|6|4|disclosed prior to acceptance of an order.|Y
01|235423|7|1|A tariff surcharge of 8% will be added to every order|Y
01|235423|7|2|placed after September 1st 2025(until further notice).|Y
01|235423|7|3|This surcharge will be acknowledged upon acceptance|Y
01|235423|7|4|of every order.|Y
01|235424|2|1|A tariff surcharge may be added to this quotation in|Y
01|235424|2|2|the event of a sustained tariff increase on the|Y
01|235424|2|3|importation of this product.  Any surcharge will be|Y
01|235424|2|4|disclosed prior to acceptance of an order.|Y
01|235425|2|1|A tariff surcharge may be added to this quotation in|Y
01|235425|2|2|the event of a sustained tariff increase on the|Y
01|235425|2|3|importation of this product.  Any surcharge will be|Y
01|235425|2|4|disclosed prior to acceptance of an order.|Y
01|235426|2|1|A tariff surcharge may be added to this quotation in|Y
01|235426|2|2|the event of a sustained tariff increase on the|Y
01|235426|2|3|importation of this product.  Any surcharge will be|Y
01|235426|2|4|disclosed prior to acceptance of an order.|Y
01|235427|2|1|A tariff surcharge may be added to this quotation in|Y
01|235427|2|2|the event of a sustained tariff increase on the|Y
01|235427|2|3|importation of this product.  Any surcharge will be|Y
01|235427|2|4|disclosed prior to acceptance of an order.|Y
01|235428|6|1|A tariff surcharge may be added to this quotation in|Y
01|235428|6|2|the event of a sustained tariff increase on the|Y
01|235428|6|3|importation of this product.  Any surcharge will be|Y
01|235428|6|4|disclosed prior to acceptance of an order.|Y
01|235429|2|1|A tariff surcharge may be added to this quotation in|Y
01|235429|2|2|the event of a sustained tariff increase on the|Y
01|235429|2|3|importation of this product.  Any surcharge will be|Y
01|235429|2|4|disclosed prior to acceptance of an order.|Y
01|235430|18|1|A tariff surcharge may be added to this quotation in|Y
01|235430|18|2|the event of a sustained tariff increase on the|Y
01|235430|18|3|importation of this product.  Any surcharge will be|Y
01|235430|18|4|disclosed prior to acceptance of an order.|Y
01|235431|15|1|A tariff surcharge may be added to this quotation in|Y
01|235431|15|2|the event of a sustained tariff increase on the|Y
01|235431|15|3|importation of this product.  Any surcharge will be|Y
01|235431|15|4|disclosed prior to acceptance of an order.|Y
01|235432|2|1|A tariff surcharge may be added to this quotation in|Y
01|235432|2|2|the event of a sustained tariff increase on the|Y
01|235432|2|3|importation of this product.  Any surcharge will be|Y
01|235432|2|4|disclosed prior to acceptance of an order.|Y
01|235433|2|1|A tariff surcharge may be added to this quotation in|Y
01|235433|2|2|the event of a sustained tariff increase on the|Y
01|235433|2|3|importation of this product.  Any surcharge will be|Y
01|235433|2|4|disclosed prior to acceptance of an order.|Y
01|235434|10|1|A tariff surcharge may be added to this quotation in|Y
01|235434|10|2|the event of a sustained tariff increase on the|Y
01|235434|10|3|importation of this product.  Any surcharge will be|Y
01|235434|10|4|disclosed prior to acceptance of an order.|Y
01|235435|3|1|A tariff surcharge may be added to this quotation in|Y
01|235435|3|2|the event of a sustained tariff increase on the|Y
01|235435|3|3|importation of this product.  Any surcharge will be|Y
01|235435|3|4|disclosed prior to acceptance of an order.|Y
01|235436|2|1|A tariff surcharge may be added to this quotation in|Y
01|235436|2|2|the event of a sustained tariff increase on the|Y
01|235436|2|3|importation of this product.  Any surcharge will be|Y
01|235436|2|4|disclosed prior to acceptance of an order.|Y
01|235437|2|1|A tariff surcharge may be added to this quotation in|Y
01|235437|2|2|the event of a sustained tariff increase on the|Y
01|235437|2|3|importation of this product.  Any surcharge will be|Y
01|235437|2|4|disclosed prior to acceptance of an order.|Y
01|235438|2|1|A tariff surcharge may be added to this quotation in|Y
01|235438|2|2|the event of a sustained tariff increase on the|Y
01|235438|2|3|importation of this product.  Any surcharge will be|Y
01|235438|2|4|disclosed prior to acceptance of an order.|Y
01|235439|3|1|A tariff surcharge may be added to this quotation in|Y
01|235439|3|2|the event of a sustained tariff increase on the|Y
01|235439|3|3|importation of this product.  Any surcharge will be|Y
01|235439|3|4|disclosed prior to acceptance of an order.|Y
01|235440|2|1|A tariff surcharge may be added to this quotation in|Y
01|235440|2|2|the event of a sustained tariff increase on the|Y
01|235440|2|3|importation of this product.  Any surcharge will be|Y
01|235440|2|4|disclosed prior to acceptance of an order.|Y
01|235441|2|1|A tariff surcharge may be added to this quotation in|Y
01|235441|2|2|the event of a sustained tariff increase on the|Y
01|235441|2|3|importation of this product.  Any surcharge will be|Y
01|235441|2|4|disclosed prior to acceptance of an order.|Y
01|235442|8|1|A tariff surcharge may be added to this quotation in|Y
01|235442|8|2|the event of a sustained tariff increase on the|Y
01|235442|8|3|importation of this product.  Any surcharge will be|Y
01|235442|8|4|disclosed prior to acceptance of an order.|Y
01|235443|6|1|A tariff surcharge may be added to this quotation in|Y
01|235443|6|2|the event of a sustained tariff increase on the|Y
01|235443|6|3|importation of this product.  Any surcharge will be|Y
01|235443|6|4|disclosed prior to acceptance of an order.|Y
01|235445|3|1|A tariff surcharge may be added to this quotation in|Y
01|235445|3|2|the event of a sustained tariff increase on the|Y
01|235445|3|3|importation of this product.  Any surcharge will be|Y
01|235445|3|4|disclosed prior to acceptance of an order.|Y
01|235446|2|1|A tariff surcharge may be added to this quotation in|Y
01|235446|2|2|the event of a sustained tariff increase on the|Y
01|235446|2|3|importation of this product.  Any surcharge will be|Y
01|235446|2|4|disclosed prior to acceptance of an order.|Y
01|235447|5|1|A tariff surcharge may be added to this quotation in|Y
01|235447|5|2|the event of a sustained tariff increase on the|Y
01|235447|5|3|importation of this product.  Any surcharge will be|Y
01|235447|5|4|disclosed prior to acceptance of an order.|Y
01|235448|1|1|Estimated lead time is 2 weeks after receipt of an|Y
01|235448|1|2|order.|Y
01|235448|4|1|A tariff surcharge may be added to this quotation in|Y
01|235448|4|2|the event of a sustained tariff increase on the|Y
01|235448|4|3|importation of this product.  Any surcharge will be|Y
01|235448|4|4|disclosed prior to acceptance of an order.|Y
01|235449|1|1|RGA#TAR-62082|Y
01|235449|1|2|CNC-401 SN: 11907|Y
01|235449|24|1|A tariff surcharge may be added to this quotation in|Y
01|235449|24|2|the event of a sustained tariff increase on the|Y
01|235449|24|3|importation of this product.  Any surcharge will be|Y
01|235449|24|4|disclosed prior to acceptance of an order.|Y
01|235450|2|1|A tariff surcharge may be added to this quotation in|Y
01|235450|2|2|the event of a sustained tariff increase on the|Y
01|235450|2|3|importation of this product.  Any surcharge will be|Y
01|235450|2|4|disclosed prior to acceptance of an order.|Y
01|235451|2|1|A tariff surcharge of 8% will be added to every order|Y
01|235451|2|2|placed after September 1st 2025(until further notice).|Y
01|235451|2|3|This surcharge will be acknowledged upon acceptance|Y
01|235451|2|4|of every order.|Y
01|235452|6|1|Please note above items are considered overstock.|Y
01|235452|6|2|Once PO/order issued these cannot be cancelled or|Y
01|235452|6|3|returned. Items will needed to be requoted for price &|Y
01|235452|6|4|availability upon stock depletion.|Y
01|235452|11|1|A tariff surcharge may be added to this quotation in|Y
01|235452|11|2|the event of a sustained tariff increase on the|Y
01|235452|11|3|importation of this product.  Any surcharge will be|Y
01|235452|11|4|disclosed prior to acceptance of an order.|Y
01|235453|7|1|3~5 Days after design confirmation.|Y
01|235453|12|1|3~5 Days after design confirmation.|Y
01|235453|16|1|Estimated lead time is mid/end August.|Y
01|235453|21|1|3~5 Days after design confirmation.|Y
01|235453|27|1|A tariff surcharge may be added to this quotation in|Y
01|235453|27|2|the event of a sustained tariff increase on the|Y
01|235453|27|3|importation of this product.  Any surcharge will be|Y
01|235453|27|4|disclosed prior to acceptance of an order.|Y
01|235454|5|1|A tariff surcharge may be added to this quotation in|Y
01|235454|5|2|the event of a sustained tariff increase on the|Y
01|235454|5|3|importation of this product.  Any surcharge will be|Y
01|235454|5|4|disclosed prior to acceptance of an order.|Y
01|235455|1|1|RGA#TAR-62062|Y
01|235455|1|2|CNCZ180LSA SN:25162T|Y
01|235455|20|1|A tariff surcharge may be added to this quotation in|Y
01|235455|20|2|the event of a sustained tariff increase on the|Y
01|235455|20|3|importation of this product.  Any surcharge will be|Y
01|235455|20|4|disclosed prior to acceptance of an order.|Y
01|235456|2|1|A tariff surcharge may be added to this quotation in|Y
01|235456|2|2|the event of a sustained tariff increase on the|Y
01|235456|2|3|importation of this product.  Any surcharge will be|Y
01|235456|2|4|disclosed prior to acceptance of an order.|Y
01|235457|2|1|A tariff surcharge may be added to this quotation in|Y
01|235457|2|2|the event of a sustained tariff increase on the|Y
01|235457|2|3|importation of this product.  Any surcharge will be|Y
01|235457|2|4|disclosed prior to acceptance of an order.|Y
01|235458|2|1|A tariff surcharge may be added to this quotation in|Y
01|235458|2|2|the event of a sustained tariff increase on the|Y
01|235458|2|3|importation of this product.  Any surcharge will be|Y
01|235458|2|4|disclosed prior to acceptance of an order.|Y
01|235459|2|1|A tariff surcharge may be added to this quotation in|Y
01|235459|2|2|the event of a sustained tariff increase on the|Y
01|235459|2|3|importation of this product.  Any surcharge will be|Y
01|235459|2|4|disclosed prior to acceptance of an order.|Y
01|235460|3|1|A tariff surcharge may be added to this quotation in|Y
01|235460|3|2|the event of a sustained tariff increase on the|Y
01|235460|3|3|importation of this product.  Any surcharge will be|Y
01|235460|3|4|disclosed prior to acceptance of an order.|Y
01|235461|5|1|A tariff surcharge may be added to this quotation in|Y
01|235461|5|2|the event of a sustained tariff increase on the|Y
01|235461|5|3|importation of this product.  Any surcharge will be|Y
01|235461|5|4|disclosed prior to acceptance of an order.|Y
01|235462|2|1|External power and feedback cables for 4th & 5th axis|Y
01|235462|4|1|A tariff surcharge may be added to this quotation in|Y
01|235462|4|2|the event of a sustained tariff increase on the|Y
01|235462|4|3|importation of this product.  Any surcharge will be|Y
01|235462|4|4|disclosed prior to acceptance of an order.|Y
01|235463|3|1|A tariff surcharge may be added to this quotation in|Y
01|235463|3|2|the event of a sustained tariff increase on the|Y
01|235463|3|3|importation of this product.  Any surcharge will be|Y
01|235463|3|4|disclosed prior to acceptance of an order.|Y
01|235464|2|1|A tariff surcharge may be added to this quotation in|Y
01|235464|2|2|the event of a sustained tariff increase on the|Y
01|235464|2|3|importation of this product.  Any surcharge will be|Y
01|235464|2|4|disclosed prior to acceptance of an order.|Y
01|235465|4|1|A tariff surcharge may be added to this quotation in|Y
01|235465|4|2|the event of a sustained tariff increase on the|Y
01|235465|4|3|importation of this product.  Any surcharge will be|Y
01|235465|4|4|disclosed prior to acceptance of an order.|Y
01|235466|4|1|A tariff surcharge may be added to this quotation in|Y
01|235466|4|2|the event of a sustained tariff increase on the|Y
01|235466|4|3|importation of this product.  Any surcharge will be|Y
01|235466|4|4|disclosed prior to acceptance of an order.|Y
01|235467|53|1|A tariff surcharge may be added to this quotation in|Y
01|235467|53|2|the event of a sustained tariff increase on the|Y
01|235467|53|3|importation of this product.  Any surcharge will be|Y
01|235467|53|4|disclosed prior to acceptance of an order.|Y
01|235468|4|1|A tariff surcharge may be added to this quotation in|Y
01|235468|4|2|the event of a sustained tariff increase on the|Y
01|235468|4|3|importation of this product.  Any surcharge will be|Y
01|235468|4|4|disclosed prior to acceptance of an order.|Y
01|235469|2|1|A tariff surcharge may be added to this quotation in|Y
01|235469|2|2|the event of a sustained tariff increase on the|Y
01|235469|2|3|importation of this product.  Any surcharge will be|Y
01|235469|2|4|disclosed prior to acceptance of an order.|Y
01|235470|2|1|A tariff surcharge may be added to this quotation in|Y
01|235470|2|2|the event of a sustained tariff increase on the|Y
01|235470|2|3|importation of this product.  Any surcharge will be|Y
01|235470|2|4|disclosed prior to acceptance of an order.|Y
01|235471|1|1|Pas de origen: Italia|Y
01|235471|2|1|Pas de origen: Italia|Y
01|235471|3|1|Pas de origen: Italia|Y
01|235471|4|1|Pas de origen: China|Y
01|235471|5|1|Pas de origen: China|Y
01|235471|7|1|A tariff surcharge may be added to this quotation in|Y
01|235471|7|2|the event of a sustained tariff increase on the|Y
01|235471|7|3|importation of this product.  Any surcharge will be|Y
01|235471|7|4|disclosed prior to acceptance of an order.|Y
01|235472|1|1|Pas de origen: Italia|Y
01|235472|2|1|Pas de origen: Italia|Y
01|235472|3|1|Pas de origen: Italia|Y
01|235472|4|1|Pas de origen: China|Y
01|235472|5|1|Pas de origen: China|Y
01|235472|7|1|A tariff surcharge may be added to this quotation in|Y
01|235472|7|2|the event of a sustained tariff increase on the|Y
01|235472|7|3|importation of this product.  Any surcharge will be|Y
01|235472|7|4|disclosed prior to acceptance of an order.|Y
01|235473|5|1|A tariff surcharge may be added to this quotation in|Y
01|235473|5|2|the event of a sustained tariff increase on the|Y
01|235473|5|3|importation of this product.  Any surcharge will be|Y
01|235473|5|4|disclosed prior to acceptance of an order.|Y
01|235474|5|1|A tariff surcharge may be added to this quotation in|Y
01|235474|5|2|the event of a sustained tariff increase on the|Y
01|235474|5|3|importation of this product.  Any surcharge will be|Y
01|235474|5|4|disclosed prior to acceptance of an order.|Y
01|235475|4|1|A tariff surcharge may be added to this quotation in|Y
01|235475|4|2|the event of a sustained tariff increase on the|Y
01|235475|4|3|importation of this product.  Any surcharge will be|Y
01|235475|4|4|disclosed prior to acceptance of an order.|Y
01|235476|9|1|A tariff surcharge may be added to this quotation in|Y
01|235476|9|2|the event of a sustained tariff increase on the|Y
01|235476|9|3|importation of this product.  Any surcharge will be|Y
01|235476|9|4|disclosed prior to acceptance of an order.|Y
01|235477|9|1|A tariff surcharge may be added to this quotation in|Y
01|235477|9|2|the event of a sustained tariff increase on the|Y
01|235477|9|3|importation of this product.  Any surcharge will be|Y
01|235477|9|4|disclosed prior to acceptance of an order.|Y
01|235478|10|1|A tariff surcharge may be added to this quotation in|Y
01|235478|10|2|the event of a sustained tariff increase on the|Y
01|235478|10|3|importation of this product.  Any surcharge will be|Y
01|235478|10|4|disclosed prior to acceptance of an order.|Y
01|235479|1|1|Special Discount End User test price|Y
01|235479|2|1|Special Discount End User test price|Y
01|235479|4|1|A tariff surcharge may be added to this quotation in|Y
01|235479|4|2|the event of a sustained tariff increase on the|Y
01|235479|4|3|importation of this product.  Any surcharge will be|Y
01|235479|4|4|disclosed prior to acceptance of an order.|Y
01|235480|6|1|A tariff surcharge may be added to this quotation in|Y
01|235480|6|2|the event of a sustained tariff increase on the|Y
01|235480|6|3|importation of this product.  Any surcharge will be|Y
01|235480|6|4|disclosed prior to acceptance of an order.|Y
01|235481|3|1|A tariff surcharge may be added to this quotation in|Y
01|235481|3|2|the event of a sustained tariff increase on the|Y
01|235481|3|3|importation of this product.  Any surcharge will be|Y
01|235481|3|4|disclosed prior to acceptance of an order.|Y
01|235482|2|1|A tariff surcharge may be added to this quotation in|Y
01|235482|2|2|the event of a sustained tariff increase on the|Y
01|235482|2|3|importation of this product.  Any surcharge will be|Y
01|235482|2|4|disclosed prior to acceptance of an order.|Y
01|235483|2|1|A tariff surcharge may be added to this quotation in|Y
01|235483|2|2|the event of a sustained tariff increase on the|Y
01|235483|2|3|importation of this product.  Any surcharge will be|Y
01|235483|2|4|disclosed prior to acceptance of an order.|Y
01|235484|3|1|A tariff surcharge may be added to this quotation in|Y
01|235484|3|2|the event of a sustained tariff increase on the|Y
01|235484|3|3|importation of this product.  Any surcharge will be|Y
01|235484|3|4|disclosed prior to acceptance of an order.|Y
01|235485|3|1|A tariff surcharge may be added to this quotation in|Y
01|235485|3|2|the event of a sustained tariff increase on the|Y
01|235485|3|3|importation of this product.  Any surcharge will be|Y
01|235485|3|4|disclosed prior to acceptance of an order.|Y
01|235486|16|1|A tariff surcharge may be added to this quotation in|Y
01|235486|16|2|the event of a sustained tariff increase on the|Y
01|235486|16|3|importation of this product.  Any surcharge will be|Y
01|235486|16|4|disclosed prior to acceptance of an order.|Y
01|235487|2|1|A tariff surcharge may be added to this quotation in|Y
01|235487|2|2|the event of a sustained tariff increase on the|Y
01|235487|2|3|importation of this product.  Any surcharge will be|Y
01|235487|2|4|disclosed prior to acceptance of an order.|Y
01|235488|5|1|A tariff surcharge may be added to this quotation in|Y
01|235488|5|2|the event of a sustained tariff increase on the|Y
01|235488|5|3|importation of this product.  Any surcharge will be|Y
01|235488|5|4|disclosed prior to acceptance of an order.|Y
01|235489|2|1|A tariff surcharge may be added to this quotation in|Y
01|235489|2|2|the event of a sustained tariff increase on the|Y
01|235489|2|3|importation of this product.  Any surcharge will be|Y
01|235489|2|4|disclosed prior to acceptance of an order.|Y
01|235490|10|1|A tariff surcharge may be added to this quotation in|Y
01|235490|10|2|the event of a sustained tariff increase on the|Y
01|235490|10|3|importation of this product.  Any surcharge will be|Y
01|235490|10|4|disclosed prior to acceptance of an order.|Y
01|235491|1|1|NBT30-SK10C-90-RPNJ|Y
01|235491|1|2|NBT30 DualContact Slim Chuck SK10 15K Nano Coolant|Y
01|235491|8|1|A tariff surcharge may be added to this quotation in|Y
01|235491|8|2|the event of a sustained tariff increase on the|Y
01|235491|8|3|importation of this product.  Any surcharge will be|Y
01|235491|8|4|disclosed prior to acceptance of an order.|Y
01|235492|3|1|A tariff surcharge may be added to this quotation in|Y
01|235492|3|2|the event of a sustained tariff increase on the|Y
01|235492|3|3|importation of this product.  Any surcharge will be|Y
01|235492|3|4|disclosed prior to acceptance of an order.|Y
01|235493|3|1|A tariff surcharge may be added to this quotation in|Y
01|235493|3|2|the event of a sustained tariff increase on the|Y
01|235493|3|3|importation of this product.  Any surcharge will be|Y
01|235493|3|4|disclosed prior to acceptance of an order.|Y
01|235494|3|1|A tariff surcharge may be added to this quotation in|Y
01|235494|3|2|the event of a sustained tariff increase on the|Y
01|235494|3|3|importation of this product.  Any surcharge will be|Y
01|235494|3|4|disclosed prior to acceptance of an order.|Y
01|235495|2|1|A tariff surcharge may be added to this quotation in|Y
01|235495|2|2|the event of a sustained tariff increase on the|Y
01|235495|2|3|importation of this product.  Any surcharge will be|Y
01|235495|2|4|disclosed prior to acceptance of an order.|Y
01|235496|6|1|REFERENCE EMAIL.  Can use Standard SK Collet with|Y
01|235496|6|2|appropriate Coolant Nut and Coolant-Thru Disk and|Y
01|235496|6|3|Disk Wrench.|Y
01|235496|40|1|A tariff surcharge may be added to this quotation in|Y
01|235496|40|2|the event of a sustained tariff increase on the|Y
01|235496|40|3|importation of this product.  Any surcharge will be|Y
01|235496|40|4|disclosed prior to acceptance of an order.|Y
01|235497|2|1|NBT30-SK10C-90-RPNJ|Y
01|235497|2|2|NBT30 DualContact Slim Chuck SK10 15K Nano Coolant|Y
01|235497|9|1|NBT30-SZF10C-90-RPNJ|Y
01|235497|9|2|NBT30 DualContact Bullseye Zerofit Slim Chuck SK10 15K|Y
01|235497|9|3|Nano Coolant|Y
01|235497|16|1|A tariff surcharge may be added to this quotation in|Y
01|235497|16|2|the event of a sustained tariff increase on the|Y
01|235497|16|3|importation of this product.  Any surcharge will be|Y
01|235497|16|4|disclosed prior to acceptance of an order.|Y
01|235498|11|1|A tariff surcharge may be added to this quotation in|Y
01|235498|11|2|the event of a sustained tariff increase on the|Y
01|235498|11|3|importation of this product.  Any surcharge will be|Y
01|235498|11|4|disclosed prior to acceptance of an order.|Y
01|235499|12|1|A tariff surcharge may be added to this quotation in|Y
01|235499|12|2|the event of a sustained tariff increase on the|Y
01|235499|12|3|importation of this product.  Any surcharge will be|Y
01|235499|12|4|disclosed prior to acceptance of an order.|Y
01|235500|2|1|A tariff surcharge may be added to this quotation in|Y
01|235500|2|2|the event of a sustained tariff increase on the|Y
01|235500|2|3|importation of this product.  Any surcharge will be|Y
01|235500|2|4|disclosed prior to acceptance of an order.|Y
01|235501|2|1|A tariff surcharge may be added to this quotation in|Y
01|235501|2|2|the event of a sustained tariff increase on the|Y
01|235501|2|3|importation of this product.  Any surcharge will be|Y
01|235501|2|4|disclosed prior to acceptance of an order.|Y
01|235502|2|1|A tariff surcharge may be added to this quotation in|Y
01|235502|2|2|the event of a sustained tariff increase on the|Y
01|235502|2|3|importation of this product.  Any surcharge will be|Y
01|235502|2|4|disclosed prior to acceptance of an order.|Y
01|235503|3|1|A tariff surcharge may be added to this quotation in|Y
01|235503|3|2|the event of a sustained tariff increase on the|Y
01|235503|3|3|importation of this product.  Any surcharge will be|Y
01|235503|3|4|disclosed prior to acceptance of an order.|Y
01|235504|2|1|A tariff surcharge may be added to this quotation in|Y
01|235504|2|2|the event of a sustained tariff increase on the|Y
01|235504|2|3|importation of this product.  Any surcharge will be|Y
01|235504|2|4|disclosed prior to acceptance of an order.|Y
01|235505|3|1|A tariff surcharge may be added to this quotation in|Y
01|235505|3|2|the event of a sustained tariff increase on the|Y
01|235505|3|3|importation of this product.  Any surcharge will be|Y
01|235505|3|4|disclosed prior to acceptance of an order.|Y
01|235506|2|1|A tariff surcharge may be added to this quotation in|Y
01|235506|2|2|the event of a sustained tariff increase on the|Y
01|235506|2|3|importation of this product.  Any surcharge will be|Y
01|235506|2|4|disclosed prior to acceptance of an order.|Y
01|235507|2|1|Please note additional 20% applied per overstock promo.|Y
01|235507|2|2|Once PO/order issued these cannot be cancelled or|Y
01|235507|2|3|returned. Upon stock depletion price and availability|Y
01|235507|2|4|will need to be requoted.|Y
01|235507|7|1|Please note this additional unit is considered special.|Y
01|235507|7|2|This has been quoted at special net price and cannot be|Y
01|235507|7|3|cancelled or returned once PO/order has been issued.|Y
01|235507|7|4|Manufacturing time is 4-5 weeks plus delivery into|Y
01|235507|7|5|warehouse.|Y
01|235507|14|1|Please note this additional unit is considered special.|Y
01|235507|14|2|This has been quoted at special net price and cannot be|Y
01|235507|14|3|cancelled or returned once PO/order has been issued.|Y
01|235507|14|4|Currently stocked at factory 2 weeks delivery time.|Y
01|235507|31|1|A tariff surcharge may be added to this quotation in|Y
01|235507|31|2|the event of a sustained tariff increase on the|Y
01|235507|31|3|importation of this product.  Any surcharge will be|Y
01|235507|31|4|disclosed prior to acceptance of an order.|Y
01|235508|15|1|A tariff surcharge may be added to this quotation in|Y
01|235508|15|2|the event of a sustained tariff increase on the|Y
01|235508|15|3|importation of this product.  Any surcharge will be|Y
01|235508|15|4|disclosed prior to acceptance of an order.|Y
01|235509|4|1|A tariff surcharge may be added to this quotation in|Y
01|235509|4|2|the event of a sustained tariff increase on the|Y
01|235509|4|3|importation of this product.  Any surcharge will be|Y
01|235509|4|4|disclosed prior to acceptance of an order.|Y
01|235510|4|1|A tariff surcharge may be added to this quotation in|Y
01|235510|4|2|the event of a sustained tariff increase on the|Y
01|235510|4|3|importation of this product.  Any surcharge will be|Y
01|235510|4|4|disclosed prior to acceptance of an order.|Y
01|235511|2|1|A tariff surcharge may be added to this quotation in|Y
01|235511|2|2|the event of a sustained tariff increase on the|Y
01|235511|2|3|importation of this product.  Any surcharge will be|Y
01|235511|2|4|disclosed prior to acceptance of an order.|Y
01|235513|2|1|A tariff surcharge may be added to this quotation in|Y
01|235513|2|2|the event of a sustained tariff increase on the|Y
01|235513|2|3|importation of this product.  Any surcharge will be|Y
01|235513|2|4|disclosed prior to acceptance of an order.|Y
01|235514|2|1|A tariff surcharge may be added to this quotation in|Y
01|235514|2|2|the event of a sustained tariff increase on the|Y
01|235514|2|3|importation of this product.  Any surcharge will be|Y
01|235514|2|4|disclosed prior to acceptance of an order.|Y
01|235515|2|1|A tariff surcharge may be added to this quotation in|Y
01|235515|2|2|the event of a sustained tariff increase on the|Y
01|235515|2|3|importation of this product.  Any surcharge will be|Y
01|235515|2|4|disclosed prior to acceptance of an order.|Y
01|235516|4|1|A tariff surcharge may be added to this quotation in|Y
01|235516|4|2|the event of a sustained tariff increase on the|Y
01|235516|4|3|importation of this product.  Any surcharge will be|Y
01|235516|4|4|disclosed prior to acceptance of an order.|Y
01|235517|2|1|A tariff surcharge may be added to this quotation in|Y
01|235517|2|2|the event of a sustained tariff increase on the|Y
01|235517|2|3|importation of this product.  Any surcharge will be|Y
01|235517|2|4|disclosed prior to acceptance of an order.|Y
01|235518|2|1|A tariff surcharge may be added to this quotation in|Y
01|235518|2|2|the event of a sustained tariff increase on the|Y
01|235518|2|3|importation of this product.  Any surcharge will be|Y
01|235518|2|4|disclosed prior to acceptance of an order.|Y
01|235519|4|1|A tariff surcharge may be added to this quotation in|Y
01|235519|4|2|the event of a sustained tariff increase on the|Y
01|235519|4|3|importation of this product.  Any surcharge will be|Y
01|235519|4|4|disclosed prior to acceptance of an order.|Y
01|235520|2|1|A tariff surcharge may be added to this quotation in|Y
01|235520|2|2|the event of a sustained tariff increase on the|Y
01|235520|2|3|importation of this product.  Any surcharge will be|Y
01|235520|2|4|disclosed prior to acceptance of an order.|Y
01|235521|2|1|A tariff surcharge may be added to this quotation in|Y
01|235521|2|2|the event of a sustained tariff increase on the|Y
01|235521|2|3|importation of this product.  Any surcharge will be|Y
01|235521|2|4|disclosed prior to acceptance of an order.|Y
01|235522|4|1|A tariff surcharge may be added to this quotation in|Y
01|235522|4|2|the event of a sustained tariff increase on the|Y
01|235522|4|3|importation of this product.  Any surcharge will be|Y
01|235522|4|4|disclosed prior to acceptance of an order.|Y
01|235523|1|1|Please Note: KM7/8-1/2 is non standard stock. Once a|Y
01|235523|1|2|purchase order is placed it cannot be cancelled|Y
01|235523|1|3|or returned.|Y
01|235523|3|1|A tariff surcharge may be added to this quotation in|Y
01|235523|3|2|the event of a sustained tariff increase on the|Y
01|235523|3|3|importation of this product.  Any surcharge will be|Y
01|235523|3|4|disclosed prior to acceptance of an order.|Y
01|235524|2|1|A tariff surcharge may be added to this quotation in|Y
01|235524|2|2|the event of a sustained tariff increase on the|Y
01|235524|2|3|importation of this product.  Any surcharge will be|Y
01|235524|2|4|disclosed prior to acceptance of an order.|Y
01|235525|30|1|A tariff surcharge may be added to this quotation in|Y
01|235525|30|2|the event of a sustained tariff increase on the|Y
01|235525|30|3|importation of this product.  Any surcharge will be|Y
01|235525|30|4|disclosed prior to acceptance of an order.|Y
01|235526|8|1|A tariff surcharge may be added to this quotation in|Y
01|235526|8|2|the event of a sustained tariff increase on the|Y
01|235526|8|3|importation of this product.  Any surcharge will be|Y
01|235526|8|4|disclosed prior to acceptance of an order.|Y
01|235527|4|1|A tariff surcharge may be added to this quotation in|Y
01|235527|4|2|the event of a sustained tariff increase on the|Y
01|235527|4|3|importation of this product.  Any surcharge will be|Y
01|235527|4|4|disclosed prior to acceptance of an order.|Y
01|235528|2|1|A tariff surcharge may be added to this quotation in|Y
01|235528|2|2|the event of a sustained tariff increase on the|Y
01|235528|2|3|importation of this product.  Any surcharge will be|Y
01|235528|2|4|disclosed prior to acceptance of an order.|Y
01|235529|1|1|CAT40-CZF1.1/4-120U-IDU  **NET PRICE**|Y
01|235529|1|2|CAT40 BullsEye ZeroFit Milling Chuck C1.1/4 120mm GL|Y
01|235529|1|3|**Custom special tool. Cannot be cancelled or|Y
01|235529|1|4|returned upon receipt of PO**|Y
01|235529|2|1|A tariff surcharge may be added to this quotation in|Y
01|235529|2|2|the event of a sustained tariff increase on the|Y
01|235529|2|3|importation of this product.  Any surcharge will be|Y
01|235529|2|4|disclosed prior to acceptance of an order.|Y
01|235530|4|1|A tariff surcharge may be added to this quotation in|Y
01|235530|4|2|the event of a sustained tariff increase on the|Y
01|235530|4|3|importation of this product.  Any surcharge will be|Y
01|235530|4|4|disclosed prior to acceptance of an order.|Y
01|235531|2|1|A tariff surcharge may be added to this quotation in|Y
01|235531|2|2|the event of a sustained tariff increase on the|Y
01|235531|2|3|importation of this product.  Any surcharge will be|Y
01|235531|2|4|disclosed prior to acceptance of an order.|Y
01|235532|4|1|A tariff surcharge may be added to this quotation in|Y
01|235532|4|2|the event of a sustained tariff increase on the|Y
01|235532|4|3|importation of this product.  Any surcharge will be|Y
01|235532|4|4|disclosed prior to acceptance of an order.|Y
01|235533|3|1|A tariff surcharge may be added to this quotation in|Y
01|235533|3|2|the event of a sustained tariff increase on the|Y
01|235533|3|3|importation of this product.  Any surcharge will be|Y
01|235533|3|4|disclosed prior to acceptance of an order.|Y
01|235534|3|1|A tariff surcharge may be added to this quotation in|Y
01|235534|3|2|the event of a sustained tariff increase on the|Y
01|235534|3|3|importation of this product.  Any surcharge will be|Y
01|235534|3|4|disclosed prior to acceptance of an order.|Y
01|235535|4|1|A tariff surcharge may be added to this quotation in|Y
01|235535|4|2|the event of a sustained tariff increase on the|Y
01|235535|4|3|importation of this product.  Any surcharge will be|Y
01|235535|4|4|disclosed prior to acceptance of an order.|Y
01|235536|2|1|A tariff surcharge may be added to this quotation in|Y
01|235536|2|2|the event of a sustained tariff increase on the|Y
01|235536|2|3|importation of this product.  Any surcharge will be|Y
01|235536|2|4|disclosed prior to acceptance of an order.|Y
01|235537|3|1|A tariff surcharge may be added to this quotation in|Y
01|235537|3|2|the event of a sustained tariff increase on the|Y
01|235537|3|3|importation of this product.  Any surcharge will be|Y
01|235537|3|4|disclosed prior to acceptance of an order.|Y
01|235538|2|1|A tariff surcharge may be added to this quotation in|Y
01|235538|2|2|the event of a sustained tariff increase on the|Y
01|235538|2|3|importation of this product.  Any surcharge will be|Y
01|235538|2|4|disclosed prior to acceptance of an order.|Y
01|235539|1|1|RGA#CUR-xxxxx/|Y
01|235539|1|2|Repair of 12 x H63ARAM-SL12-280STEC-64FP s/n:|Y
01|235539|1|3|These tools will be manufactured strictly in accordance|Y
01|235539|1|4|with the customer's request to modify Right Angle|Y
01|235539|1|5|Mimatic products. Lyndex-Nikken and Mimatic were not|Y
01|235539|1|6|involved in the decision to alter the original tool|Y
01|235539|1|7|design and as such do not guarantee the performance|Y
01|235539|1|8|suitability or reliability of these modified tools in|Y
01|235539|1|9|the intended application. Any risks associated with the|Y
01|235539|1|10|use of these tools are assumed solely by the customer.|Y
01|235539|2|1|Bearings seals weldon spindle with new ER20 design|Y
01|235539|2|2|to be replaced.|Y
01|235539|3|1|A tariff surcharge may be added to this quotation in|Y
01|235539|3|2|the event of a sustained tariff increase on the|Y
01|235539|3|3|importation of this product.  Any surcharge will be|Y
01|235539|3|4|disclosed prior to acceptance of an order.|Y
01|235540|3|1|A tariff surcharge may be added to this quotation in|Y
01|235540|3|2|the event of a sustained tariff increase on the|Y
01|235540|3|3|importation of this product.  Any surcharge will be|Y
01|235540|3|4|disclosed prior to acceptance of an order.|Y
01|235541|6|1|A tariff surcharge may be added to this quotation in|Y
01|235541|6|2|the event of a sustained tariff increase on the|Y
01|235541|6|3|importation of this product.  Any surcharge will be|Y
01|235541|6|4|disclosed prior to acceptance of an order.|Y
01|235542|3|1|A tariff surcharge may be added to this quotation in|Y
01|235542|3|2|the event of a sustained tariff increase on the|Y
01|235542|3|3|importation of this product.  Any surcharge will be|Y
01|235542|3|4|disclosed prior to acceptance of an order.|Y
01|235543|3|1|A tariff surcharge may be added to this quotation in|Y
01|235543|3|2|the event of a sustained tariff increase on the|Y
01|235543|3|3|importation of this product.  Any surcharge will be|Y
01|235543|3|4|disclosed prior to acceptance of an order.|Y
01|235544|5|1|A tariff surcharge may be added to this quotation in|Y
01|235544|5|2|the event of a sustained tariff increase on the|Y
01|235544|5|3|importation of this product.  Any surcharge will be|Y
01|235544|5|4|disclosed prior to acceptance of an order.|Y
01|235545|2|1|A tariff surcharge may be added to this quotation in|Y
01|235545|2|2|the event of a sustained tariff increase on the|Y
01|235545|2|3|importation of this product.  Any surcharge will be|Y
01|235545|2|4|disclosed prior to acceptance of an order.|Y
01|235546|2|1|A tariff surcharge may be added to this quotation in|Y
01|235546|2|2|the event of a sustained tariff increase on the|Y
01|235546|2|3|importation of this product.  Any surcharge will be|Y
01|235546|2|4|disclosed prior to acceptance of an order.|Y
01|235547|2|1|A tariff surcharge may be added to this quotation in|Y
01|235547|2|2|the event of a sustained tariff increase on the|Y
01|235547|2|3|importation of this product.  Any surcharge will be|Y
01|235547|2|4|disclosed prior to acceptance of an order.|Y
01|235548|4|1|A tariff surcharge may be added to this quotation in|Y
01|235548|4|2|the event of a sustained tariff increase on the|Y
01|235548|4|3|importation of this product.  Any surcharge will be|Y
01|235548|4|4|disclosed prior to acceptance of an order.|Y
01|235549|1|1|Not Stocked in USA|Y
01|235549|2|1|Stocked in USA Standard|Y
01|235549|3|1|A tariff surcharge may be added to this quotation in|Y
01|235549|3|2|the event of a sustained tariff increase on the|Y
01|235549|3|3|importation of this product.  Any surcharge will be|Y
01|235549|3|4|disclosed prior to acceptance of an order.|Y
01|235550|3|1|A tariff surcharge may be added to this quotation in|Y
01|235550|3|2|the event of a sustained tariff increase on the|Y
01|235550|3|3|importation of this product.  Any surcharge will be|Y
01|235550|3|4|disclosed prior to acceptance of an order.|Y
01|235551|2|1|A tariff surcharge may be added to this quotation in|Y
01|235551|2|2|the event of a sustained tariff increase on the|Y
01|235551|2|3|importation of this product.  Any surcharge will be|Y
01|235551|2|4|disclosed prior to acceptance of an order.|Y
01|235552|2|1|A tariff surcharge may be added to this quotation in|Y
01|235552|2|2|the event of a sustained tariff increase on the|Y
01|235552|2|3|importation of this product.  Any surcharge will be|Y
01|235552|2|4|disclosed prior to acceptance of an order.|Y
01|235553|3|1|A tariff surcharge may be added to this quotation in|Y
01|235553|3|2|the event of a sustained tariff increase on the|Y
01|235553|3|3|importation of this product.  Any surcharge will be|Y
01|235553|3|4|disclosed prior to acceptance of an order.|Y
01|235554|5|1|A tariff surcharge may be added to this quotation in|Y
01|235554|5|2|the event of a sustained tariff increase on the|Y
01|235554|5|3|importation of this product.  Any surcharge will be|Y
01|235554|5|4|disclosed prior to acceptance of an order.|Y
01|235555|3|1|A tariff surcharge may be added to this quotation in|Y
01|235555|3|2|the event of a sustained tariff increase on the|Y
01|235555|3|3|importation of this product.  Any surcharge will be|Y
01|235555|3|4|disclosed prior to acceptance of an order.|Y
01|235556|7|1|A tariff surcharge may be added to this quotation in|Y
01|235556|7|2|the event of a sustained tariff increase on the|Y
01|235556|7|3|importation of this product.  Any surcharge will be|Y
01|235556|7|4|disclosed prior to acceptance of an order.|Y
01|235557|5|1|A tariff surcharge of 8% will be added to every order|Y
01|235557|5|2|placed after September 1st 2025(until further notice)|Y
01|235557|5|3|This surcharge will be acknowledged upon acceptance|Y
01|235557|5|4|of every order.|Y
01|235558|6|1|A tariff surcharge may be added to this quotation in|Y
01|235558|6|2|the event of a sustained tariff increase on the|Y
01|235558|6|3|importation of this product.  Any surcharge will be|Y
01|235558|6|4|disclosed prior to acceptance of an order.|Y
01|235559|6|1|A tariff surcharge may be added to this quotation in|Y
01|235559|6|2|the event of a sustained tariff increase on the|Y
01|235559|6|3|importation of this product.  Any surcharge will be|Y
01|235559|6|4|disclosed prior to acceptance of an order.|Y
01|235560|2|1|A tariff surcharge may be added to this quotation in|Y
01|235560|2|2|the event of a sustained tariff increase on the|Y
01|235560|2|3|importation of this product.  Any surcharge will be|Y
01|235560|2|4|disclosed prior to acceptance of an order.|Y
01|235561|3|1|A tariff surcharge may be added to this quotation in|Y
01|235561|3|2|the event of a sustained tariff increase on the|Y
01|235561|3|3|importation of this product.  Any surcharge will be|Y
01|235561|3|4|disclosed prior to acceptance of an order.|Y
01|235562|2|1|A tariff surcharge may be added to this quotation in|Y
01|235562|2|2|the event of a sustained tariff increase on the|Y
01|235562|2|3|importation of this product.  Any surcharge will be|Y
01|235562|2|4|disclosed prior to acceptance of an order.|Y
01|235563|4|1|A tariff surcharge may be added to this quotation in|Y
01|235563|4|2|the event of a sustained tariff increase on the|Y
01|235563|4|3|importation of this product.  Any surcharge will be|Y
01|235563|4|4|disclosed prior to acceptance of an order.|Y
01|235564|2|1|A tariff surcharge may be added to this quotation in|Y
01|235564|2|2|the event of a sustained tariff increase on the|Y
01|235564|2|3|importation of this product.  Any surcharge will be|Y
01|235564|2|4|disclosed prior to acceptance of an order.|Y
01|235565|7|1|A tariff surcharge may be added to this quotation in|Y
01|235565|7|2|the event of a sustained tariff increase on the|Y
01|235565|7|3|importation of this product.  Any surcharge will be|Y
01|235565|7|4|disclosed prior to acceptance of an order.|Y
01|235566|4|1|A tariff surcharge may be added to this quotation in|Y
01|235566|4|2|the event of a sustained tariff increase on the|Y
01|235566|4|3|importation of this product.  Any surcharge will be|Y
01|235566|4|4|disclosed prior to acceptance of an order.|Y
01|235567|6|1|A tariff surcharge may be added to this quotation in|Y
01|235567|6|2|the event of a sustained tariff increase on the|Y
01|235567|6|3|importation of this product.  Any surcharge will be|Y
01|235567|6|4|disclosed prior to acceptance of an order.|Y
01|235568|2|1|A tariff surcharge may be added to this quotation in|Y
01|235568|2|2|the event of a sustained tariff increase on the|Y
01|235568|2|3|importation of this product.  Any surcharge will be|Y
01|235568|2|4|disclosed prior to acceptance of an order.|Y
01|235569|3|1|A tariff surcharge may be added to this quotation in|Y
01|235569|3|2|the event of a sustained tariff increase on the|Y
01|235569|3|3|importation of this product.  Any surcharge will be|Y
01|235569|3|4|disclosed prior to acceptance of an order.|Y
01|235570|2|1|A tariff surcharge may be added to this quotation in|Y
01|235570|2|2|the event of a sustained tariff increase on the|Y
01|235570|2|3|importation of this product.  Any surcharge will be|Y
01|235570|2|4|disclosed prior to acceptance of an order.|Y
01|235571|2|1|A tariff surcharge may be added to this quotation in|Y
01|235571|2|2|the event of a sustained tariff increase on the|Y
01|235571|2|3|importation of this product.  Any surcharge will be|Y
01|235571|2|4|disclosed prior to acceptance of an order.|Y
01|235572|3|1|A tariff surcharge may be added to this quotation in|Y
01|235572|3|2|the event of a sustained tariff increase on the|Y
01|235572|3|3|importation of this product.  Any surcharge will be|Y
01|235572|3|4|disclosed prior to acceptance of an order.|Y
01|235573|2|1|A tariff surcharge may be added to this quotation in|Y
01|235573|2|2|the event of a sustained tariff increase on the|Y
01|235573|2|3|importation of this product.  Any surcharge will be|Y
01|235573|2|4|disclosed prior to acceptance of an order.|Y
01|235574|4|1|A tariff surcharge may be added to this quotation in|Y
01|235574|4|2|the event of a sustained tariff increase on the|Y
01|235574|4|3|importation of this product.  Any surcharge will be|Y
01|235574|4|4|disclosed prior to acceptance of an order.|Y
01|235575|3|1|A tariff surcharge may be added to this quotation in|Y
01|235575|3|2|the event of a sustained tariff increase on the|Y
01|235575|3|3|importation of this product.  Any surcharge will be|Y
01|235575|3|4|disclosed prior to acceptance of an order.|Y
01|235576|2|1|A tariff surcharge may be added to this quotation in|Y
01|235576|2|2|the event of a sustained tariff increase on the|Y
01|235576|2|3|importation of this product.  Any surcharge will be|Y
01|235576|2|4|disclosed prior to acceptance of an order.|Y
01|235577|1|1|Service call for E346+  s/n: 101366|Y
01|235577|1|2|This is a time based estimate.|Y
01|235577|1|3|Any parts that would be required would be additional.|Y
01|235577|3|1|A tariff surcharge may be added to this quotation in|Y
01|235577|3|2|the event of a sustained tariff increase on the|Y
01|235577|3|3|importation of this product.  Any surcharge will be|Y
01|235577|3|4|disclosed prior to acceptance of an order.|Y
01|235578|1|1|HSK100A 1 STUB MILL 4 GL|Y
01|235578|2|1|HSK100A 1 STUB MILL 4 GL|Y
01|235578|3|1|HSK100A 1 STUB MILL 4 GL|Y
01|235578|12|1|A tariff surcharge may be added to this quotation in|Y
01|235578|12|2|the event of a sustained tariff increase on the|Y
01|235578|12|3|importation of this product.  Any surcharge will be|Y
01|235578|12|4|disclosed prior to acceptance of an order.|Y
01|235580|2|1|Please Note: Discount reflects the Lyndex-Nikken|Y
01|235580|2|2|Overstock promotion. Tool is non-returnable.|Y
01|235580|3|1|A tariff surcharge may be added to this quotation in|Y
01|235580|3|2|the event of a sustained tariff increase on the|Y
01|235580|3|3|importation of this product.  Any surcharge will be|Y
01|235580|3|4|disclosed prior to acceptance of an order.|Y
01|235581|2|1|A tariff surcharge may be added to this quotation in|Y
01|235581|2|2|the event of a sustained tariff increase on the|Y
01|235581|2|3|importation of this product.  Any surcharge will be|Y
01|235581|2|4|disclosed prior to acceptance of an order.|Y
01|235582|3|1|50 LINEAR FEET OF AIR LINE|Y
01|235582|4|1|A tariff surcharge may be added to this quotation in|Y
01|235582|4|2|the event of a sustained tariff increase on the|Y
01|235582|4|3|importation of this product.  Any surcharge will be|Y
01|235582|4|4|disclosed prior to acceptance of an order.|Y
01|235583|3|1|50 LINEAR FEET OF AIR LINE|Y
01|235583|4|1|A tariff surcharge may be added to this quotation in|Y
01|235583|4|2|the event of a sustained tariff increase on the|Y
01|235583|4|3|importation of this product.  Any surcharge will be|Y
01|235583|4|4|disclosed prior to acceptance of an order.|Y
01|235584|2|1|A tariff surcharge may be added to this quotation in|Y
01|235584|2|2|the event of a sustained tariff increase on the|Y
01|235584|2|3|importation of this product.  Any surcharge will be|Y
01|235584|2|4|disclosed prior to acceptance of an order.|Y
01|235585|3|1|A tariff surcharge may be added to this quotation in|Y
01|235585|3|2|the event of a sustained tariff increase on the|Y
01|235585|3|3|importation of this product.  Any surcharge will be|Y
01|235585|3|4|disclosed prior to acceptance of an order.|Y
01|235586|5|1|A tariff surcharge may be added to this quotation in|Y
01|235586|5|2|the event of a sustained tariff increase on the|Y
01|235586|5|3|importation of this product.  Any surcharge will be|Y
01|235586|5|4|disclosed prior to acceptance of an order.|Y
01|235587|1|1|CNCZ180 SN: 12178|Y
01|235587|1|2|Alarm B-Axis Shifted|Y
01|235587|15|1|A tariff surcharge may be added to this quotation in|Y
01|235587|15|2|the event of a sustained tariff increase on the|Y
01|235587|15|3|importation of this product.  Any surcharge will be|Y
01|235587|15|4|disclosed prior to acceptance of an order.|Y
01|235588|2|1|A tariff surcharge may be added to this quotation in|Y
01|235588|2|2|the event of a sustained tariff increase on the|Y
01|235588|2|3|importation of this product.  Any surcharge will be|Y
01|235588|2|4|disclosed prior to acceptance of an order.|Y
01|235589|6|1|A tariff surcharge may be added to this quotation in|Y
01|235589|6|2|the event of a sustained tariff increase on the|Y
01|235589|6|3|importation of this product.  Any surcharge will be|Y
01|235589|6|4|disclosed prior to acceptance of an order.|Y
01|235590|1|1|Please Note: Pricing includes Air Freight from Japan.|Y
01|235590|1|2|Order must be received by 08/10/25 to ensure delivery|Y
01|235590|1|3|to Bae by mid November.|Y
01|235590|1|4|Quoted as NET price.|Y
01|235590|2|1|A tariff surcharge of 8% will be added to every order|Y
01|235590|2|2|placed after September 1st 2025(until further notice).|Y
01|235590|2|3|This surcharge will be acknowledged upon acceptance|Y
01|235590|2|4|of every order.|Y
01|235591|4|1|A tariff surcharge may be added to this quotation in|Y
01|235591|4|2|the event of a sustained tariff increase on the|Y
01|235591|4|3|importation of this product.  Any surcharge will be|Y
01|235591|4|4|disclosed prior to acceptance of an order.|Y
01|235592|2|1|A tariff surcharge may be added to this quotation in|Y
01|235592|2|2|the event of a sustained tariff increase on the|Y
01|235592|2|3|importation of this product.  Any surcharge will be|Y
01|235592|2|4|disclosed prior to acceptance of an order.|Y
01|235593|2|1|A tariff surcharge may be added to this quotation in|Y
01|235593|2|2|the event of a sustained tariff increase on the|Y
01|235593|2|3|importation of this product.  Any surcharge will be|Y
01|235593|2|4|disclosed prior to acceptance of an order.|Y
01|235594|5|1|A tariff surcharge may be added to this quotation in|Y
01|235594|5|2|the event of a sustained tariff increase on the|Y
01|235594|5|3|importation of this product.  Any surcharge will be|Y
01|235594|5|4|disclosed prior to acceptance of an order.|Y
01|235595|2|1|A tariff surcharge may be added to this quotation in|Y
01|235595|2|2|the event of a sustained tariff increase on the|Y
01|235595|2|3|importation of this product.  Any surcharge will be|Y
01|235595|2|4|disclosed prior to acceptance of an order.|Y
01|235596|6|1|A tariff surcharge may be added to this quotation in|Y
01|235596|6|2|the event of a sustained tariff increase on the|Y
01|235596|6|3|importation of this product.  Any surcharge will be|Y
01|235596|6|4|disclosed prior to acceptance of an order.|Y
01|235597|3|1|A tariff surcharge may be added to this quotation in|Y
01|235597|3|2|the event of a sustained tariff increase on the|Y
01|235597|3|3|importation of this product.  Any surcharge will be|Y
01|235597|3|4|disclosed prior to acceptance of an order.|Y
01|235598|2|1|A tariff surcharge may be added to this quotation in|Y
01|235598|2|2|the event of a sustained tariff increase on the|Y
01|235598|2|3|importation of this product.  Any surcharge will be|Y
01|235598|2|4|disclosed prior to acceptance of an order.|Y
01|235599|3|1|A tariff surcharge may be added to this quotation in|Y
01|235599|3|2|the event of a sustained tariff increase on the|Y
01|235599|3|3|importation of this product.  Any surcharge will be|Y
01|235599|3|4|disclosed prior to acceptance of an order.|Y
01|235600|3|1|A tariff surcharge may be added to this quotation in|Y
01|235600|3|2|the event of a sustained tariff increase on the|Y
01|235600|3|3|importation of this product.  Any surcharge will be|Y
01|235600|3|4|disclosed prior to acceptance of an order.|Y
01|235601|2|1|A tariff surcharge may be added to this quotation in|Y
01|235601|2|2|the event of a sustained tariff increase on the|Y
01|235601|2|3|importation of this product.  Any surcharge will be|Y
01|235601|2|4|disclosed prior to acceptance of an order.|Y
01|235602|2|1|A tariff surcharge may be added to this quotation in|Y
01|235602|2|2|the event of a sustained tariff increase on the|Y
01|235602|2|3|importation of this product.  Any surcharge will be|Y
01|235602|2|4|disclosed prior to acceptance of an order.|Y
01|235603|2|1|A tariff surcharge may be added to this quotation in|Y
01|235603|2|2|the event of a sustained tariff increase on the|Y
01|235603|2|3|importation of this product.  Any surcharge will be|Y
01|235603|2|4|disclosed prior to acceptance of an order.|Y
01|235604|2|1|A tariff surcharge may be added to this quotation in|Y
01|235604|2|2|the event of a sustained tariff increase on the|Y
01|235604|2|3|importation of this product.  Any surcharge will be|Y
01|235604|2|4|disclosed prior to acceptance of an order.|Y
01|235605|2|1|A tariff surcharge may be added to this quotation in|Y
01|235605|2|2|the event of a sustained tariff increase on the|Y
01|235605|2|3|importation of this product.  Any surcharge will be|Y
01|235605|2|4|disclosed prior to acceptance of an order.|Y
01|235606|2|1|Please note additional 20% applied per overstock promo.|Y
01|235606|2|2|Once PO/order issued these cannot be cancelled or|Y
01|235606|2|3|returned. Upon stock depletion these will need to be|Y
01|235606|2|4|requoted for price and availability.|Y
01|235606|3|1|A tariff surcharge may be added to this quotation in|Y
01|235606|3|2|the event of a sustained tariff increase on the|Y
01|235606|3|3|importation of this product.  Any surcharge will be|Y
01|235606|3|4|disclosed prior to acceptance of an order.|Y
01|235607|11|1|A tariff surcharge may be added to this quotation in|Y
01|235607|11|2|the event of a sustained tariff increase on the|Y
01|235607|11|3|importation of this product.  Any surcharge will be|Y
01|235607|11|4|disclosed prior to acceptance of an order.|Y
01|235608|5|1|A tariff surcharge may be added to this quotation in|Y
01|235608|5|2|the event of a sustained tariff increase on the|Y
01|235608|5|3|importation of this product.  Any surcharge will be|Y
01|235608|5|4|disclosed prior to acceptance of an order.|Y
01|235609|2|1|A tariff surcharge may be added to this quotation in|Y
01|235609|2|2|the event of a sustained tariff increase on the|Y
01|235609|2|3|importation of this product.  Any surcharge will be|Y
01|235609|2|4|disclosed prior to acceptance of an order.|Y
01|235611|4|1|A tariff surcharge may be added to this quotation in|Y
01|235611|4|2|the event of a sustained tariff increase on the|Y
01|235611|4|3|importation of this product.  Any surcharge will be|Y
01|235611|4|4|disclosed prior to acceptance of an order.|Y
01|235612|2|1|A tariff surcharge may be added to this quotation in|Y
01|235612|2|2|the event of a sustained tariff increase on the|Y
01|235612|2|3|importation of this product.  Any surcharge will be|Y
01|235612|2|4|disclosed prior to acceptance of an order.|Y
01|235613|3|1|A tariff surcharge may be added to this quotation in|Y
01|235613|3|2|the event of a sustained tariff increase on the|Y
01|235613|3|3|importation of this product.  Any surcharge will be|Y
01|235613|3|4|disclosed prior to acceptance of an order.|Y
01|235614|5|1|A tariff surcharge may be added to this quotation in|Y
01|235614|5|2|the event of a sustained tariff increase on the|Y
01|235614|5|3|importation of this product.  Any surcharge will be|Y
01|235614|5|4|disclosed prior to acceptance of an order.|Y
01|235615|6|1|A tariff surcharge may be added to this quotation in|Y
01|235615|6|2|the event of a sustained tariff increase on the|Y
01|235615|6|3|importation of this product.  Any surcharge will be|Y
01|235615|6|4|disclosed prior to acceptance of an order.|Y
01|235617|2|1|A tariff surcharge may be added to this quotation in|Y
01|235617|2|2|the event of a sustained tariff increase on the|Y
01|235617|2|3|importation of this product.  Any surcharge will be|Y
01|235617|2|4|disclosed prior to acceptance of an order.|Y
01|235618|3|1|A tariff surcharge may be added to this quotation in|Y
01|235618|3|2|the event of a sustained tariff increase on the|Y
01|235618|3|3|importation of this product.  Any surcharge will be|Y
01|235618|3|4|disclosed prior to acceptance of an order.|Y
01|235619|11|1|A tariff surcharge may be added to this quotation in|Y
01|235619|11|2|the event of a sustained tariff increase on the|Y
01|235619|11|3|importation of this product.  Any surcharge will be|Y
01|235619|11|4|disclosed prior to acceptance of an order.|Y
01|235620|5|1|A tariff surcharge may be added to this quotation in|Y
01|235620|5|2|the event of a sustained tariff increase on the|Y
01|235620|5|3|importation of this product.  Any surcharge will be|Y
01|235620|5|4|disclosed prior to acceptance of an order.|Y
01|235621|1|1|FOR HYUNDAI WIA KF4600/5600 FANUC Oi-MF+|Y
01|235621|3|1|FOR HYUNDAI WIA KF4600/5600 FANUC Oi-MF+|Y
01|235622|7|1|A tariff surcharge may be added to this quotation in|Y
01|235622|7|2|the event of a sustained tariff increase on the|Y
01|235622|7|3|importation of this product.  Any surcharge will be|Y
01|235622|7|4|disclosed prior to acceptance of an order.|Y
01|235623|2|1|A tariff surcharge may be added to this quotation in|Y
01|235623|2|2|the event of a sustained tariff increase on the|Y
01|235623|2|3|importation of this product.  Any surcharge will be|Y
01|235623|2|4|disclosed prior to acceptance of an order.|Y
01|235624|3|1|A tariff surcharge may be added to this quotation in|Y
01|235624|3|2|the event of a sustained tariff increase on the|Y
01|235624|3|3|importation of this product.  Any surcharge will be|Y
01|235624|3|4|disclosed prior to acceptance of an order.|Y
01|235625|2|1|A tariff surcharge may be added to this quotation in|Y
01|235625|2|2|the event of a sustained tariff increase on the|Y
01|235625|2|3|importation of this product.  Any surcharge will be|Y
01|235625|2|4|disclosed prior to acceptance of an order.|Y
01|235626|2|1|A tariff surcharge may be added to this quotation in|Y
01|235626|2|2|the event of a sustained tariff increase on the|Y
01|235626|2|3|importation of this product.  Any surcharge will be|Y
01|235626|2|4|disclosed prior to acceptance of an order.|Y
01|235627|3|1|A tariff surcharge may be added to this quotation in|Y
01|235627|3|2|the event of a sustained tariff increase on the|Y
01|235627|3|3|importation of this product.  Any surcharge will be|Y
01|235627|3|4|disclosed prior to acceptance of an order.|Y
01|235628|1|1|Nikken Table includes Power and Feedback Cables to the|Y
01|235628|1|2|Machine Bulkhead|Y
01|235628|3|1|A tariff surcharge may be added to this quotation in|Y
01|235628|3|2|the event of a sustained tariff increase on the|Y
01|235628|3|3|importation of this product.  Any surcharge will be|Y
01|235628|3|4|disclosed prior to acceptance of an order.|Y
01|235629|3|1|A tariff surcharge may be added to this quotation in|Y
01|235629|3|2|the event of a sustained tariff increase on the|Y
01|235629|3|3|importation of this product.  Any surcharge will be|Y
01|235629|3|4|disclosed prior to acceptance of an order.|Y
01|235630|2|1|A tariff surcharge may be added to this quotation in|Y
01|235630|2|2|the event of a sustained tariff increase on the|Y
01|235630|2|3|importation of this product.  Any surcharge will be|Y
01|235630|2|4|disclosed prior to acceptance of an order.|Y
01|235631|4|1|A tariff surcharge may be added to this quotation in|Y
01|235631|4|2|the event of a sustained tariff increase on the|Y
01|235631|4|3|importation of this product.  Any surcharge will be|Y
01|235631|4|4|disclosed prior to acceptance of an order.|Y
01|235632|1|1|Tariff Code: 8466.10.0175 / Country of Origin Taiwan|Y
01|235632|2|1|A tariff surcharge may be added to this quotation in|Y
01|235632|2|2|the event of a sustained tariff increase on the|Y
01|235632|2|3|importation of this product.  Any surcharge will be|Y
01|235632|2|4|disclosed prior to acceptance of an order.|Y
01|235633|2|1|TURNING CENTER TOOLING CERT $2500 LIST VALUE|Y
01|235633|6|1|A tariff surcharge may be added to this quotation in|Y
01|235633|6|2|the event of a sustained tariff increase on the|Y
01|235633|6|3|importation of this product.  Any surcharge will be|Y
01|235633|6|4|disclosed prior to acceptance of an order.|Y
01|235634|3|1|A tariff surcharge may be added to this quotation in|Y
01|235634|3|2|the event of a sustained tariff increase on the|Y
01|235634|3|3|importation of this product.  Any surcharge will be|Y
01|235634|3|4|disclosed prior to acceptance of an order.|Y
01|235635|12|1|A tariff surcharge may be added to this quotation in|Y
01|235635|12|2|the event of a sustained tariff increase on the|Y
01|235635|12|3|importation of this product.  Any surcharge will be|Y
01|235635|12|4|disclosed prior to acceptance of an order.|Y
01|235636|1|1|Not including manifold block|Y
01|235636|4|1|A tariff surcharge may be added to this quotation in|Y
01|235636|4|2|the event of a sustained tariff increase on the|Y
01|235636|4|3|importation of this product.  Any surcharge will be|Y
01|235636|4|4|disclosed prior to acceptance of an order.|Y
01|235637|2|1|A tariff surcharge may be added to this quotation in|Y
01|235637|2|2|the event of a sustained tariff increase on the|Y
01|235637|2|3|importation of this product.  Any surcharge will be|Y
01|235637|2|4|disclosed prior to acceptance of an order.|Y
01|235638|1|1|**Custom special tool - cannot be cancelled or returned|Y
01|235638|1|2|upon receipt of a PO**|Y
01|235638|1|3|NET Price includes price of holder + 4-hole DIN|Y
01|235638|1|4|Modification Charge|Y
01|235638|2|1|A tariff surcharge may be added to this quotation in|Y
01|235638|2|2|the event of a sustained tariff increase on the|Y
01|235638|2|3|importation of this product.  Any surcharge will be|Y
01|235638|2|4|disclosed prior to acceptance of an order.|Y
01|235639|2|1|A tariff surcharge may be added to this quotation in|Y
01|235639|2|2|the event of a sustained tariff increase on the|Y
01|235639|2|3|importation of this product.  Any surcharge will be|Y
01|235639|2|4|disclosed prior to acceptance of an order.|Y
01|235640|7|1|A tariff surcharge may be added to this quotation in|Y
01|235640|7|2|the event of a sustained tariff increase on the|Y
01|235640|7|3|importation of this product.  Any surcharge will be|Y
01|235640|7|4|disclosed prior to acceptance of an order.|Y
01|235642|2|1|A tariff surcharge may be added to this quotation in|Y
01|235642|2|2|the event of a sustained tariff increase on the|Y
01|235642|2|3|importation of this product.  Any surcharge will be|Y
01|235642|2|4|disclosed prior to acceptance of an order.|Y
01|235643|5|1|A tariff surcharge may be added to this quotation in|Y
01|235643|5|2|the event of a sustained tariff increase on the|Y
01|235643|5|3|importation of this product.  Any surcharge will be|Y
01|235643|5|4|disclosed prior to acceptance of an order.|Y
01|235644|5|1|A tariff surcharge may be added to this quotation in|Y
01|235644|5|2|the event of a sustained tariff increase on the|Y
01|235644|5|3|importation of this product.  Any surcharge will be|Y
01|235644|5|4|disclosed prior to acceptance of an order.|Y
01|235645|10|1|A tariff surcharge may be added to this quotation in|Y
01|235645|10|2|the event of a sustained tariff increase on the|Y
01|235645|10|3|importation of this product.  Any surcharge will be|Y
01|235645|10|4|disclosed prior to acceptance of an order.|Y
01|235646|2|1|A tariff surcharge may be added to this quotation in|Y
01|235646|2|2|the event of a sustained tariff increase on the|Y
01|235646|2|3|importation of this product.  Any surcharge will be|Y
01|235646|2|4|disclosed prior to acceptance of an order.|Y
01|235647|3|1|A tariff surcharge may be added to this quotation in|Y
01|235647|3|2|the event of a sustained tariff increase on the|Y
01|235647|3|3|importation of this product.  Any surcharge will be|Y
01|235647|3|4|disclosed prior to acceptance of an order.|Y
01|235648|3|1|A tariff surcharge may be added to this quotation in|Y
01|235648|3|2|the event of a sustained tariff increase on the|Y
01|235648|3|3|importation of this product.  Any surcharge will be|Y
01|235648|3|4|disclosed prior to acceptance of an order.|Y
01|235649|3|1|A tariff surcharge may be added to this quotation in|Y
01|235649|3|2|the event of a sustained tariff increase on the|Y
01|235649|3|3|importation of this product.  Any surcharge will be|Y
01|235649|3|4|disclosed prior to acceptance of an order.|Y
01|235650|1|1|Grinding Wheel Adapter|Y
01|235650|1|2|Fanuc Robodrill CBN Wheels#TC-5213S; Pilot dia. 1.50|Y
01|235650|1|3|Special Shell Mill Arbor on BT30-Shank|Y
01|235650|1|4|Gauge Length = 1.83 With Front Clamping Spacer &|Y
01|235650|1|5|Clamp Screw as per the BPTL Drawing|Y
01|235650|1|6|Drwg: BT30SM150183-1|Y
01|235650|2|1|Grinding Wheel Adapter|Y
01|235650|2|2|Fanuc Robodrill CBN Wheels#TC-8408; Pilot dia. 1.50|Y
01|235650|2|3|Special Shell Mill Arbor on BT30-Shank|Y
01|235650|2|4|Gauge Length = 1.83 With Front Clamping Spacer &|Y
01|235650|2|5|Clamp Screw as per the BPTL Drawing|Y
01|235650|2|6|Drwg: BT30SM150183-2|Y
01|235650|3|1|Grinding Wheel Adapter|Y
01|235650|3|2|Fanuc Robodrill CBN Wheels#TC-6253; Pilot dia. 1.50|Y
01|235650|3|3|Special Shell Mill Arbor on BT30-Shank|Y
01|235650|3|4|Gauge Length = 2.06 With Front Clamping Spacer &|Y
01|235650|3|5|Clamp Screw as per the BPTL Drawing|Y
01|235650|3|6|Drwg: BT30SM150206-3.75|Y
01|235650|9|1|Grinding Wheel Adapter|Y
01|235650|9|2|Fanuc Robodrill CBN Wheels#TC-5504; Pilot dia. 1.50|Y
01|235650|9|3|Special Shell Mill Arbor on BT30-Shank;|Y
01|235650|9|4|Gauge Length = 2.36 with Front Clamping Spacer &|Y
01|235650|9|5|Clamp Screw as per the BPTL Drawing|Y
01|235650|9|6|Drwg: BT30SM150236|Y
01|235650|10|1|Grinding Wheel Adapter|Y
01|235650|10|2|Fanuc Robodrill CBN Wheels#TC-7658; Pilot dia. 1.50|Y
01|235650|10|3|Special Shell Mill Arbor on BT30-Shank|Y
01|235650|10|4|Gauge Length = 2.4 With Front Clamping Spacer &|Y
01|235650|10|5|Clamp Screw as per BPTL Drawing|Y
01|235650|10|6|Drwg: BT30SM120240|Y
01|235650|11|1|Grinding Wheel Adapter|Y
01|235650|11|2|Fanuc Robodrill CBN Wheels#TC-7666; Pilot dia. 1.50|Y
01|235650|11|3|Special Shell Mill Arbor on BT30-Shank|Y
01|235650|11|4|Gauge Length = 2.06 With Front Clamping Spacer &|Y
01|235650|11|5|Clamp Screw as per BPTL Drawing|Y
01|235650|11|6|Drwg: BT30SM150206-3.5|Y
01|235650|16|1|Grinding Wheel Adapter|Y
01|235650|16|2|Fanuc Robodrill CBN Wheels#TC-7910; Pilot dia 1.50|Y
01|235650|16|3|Special Shell Mill Arbor on BT30-Shank|Y
01|235650|16|4|Gauge Length = 2.06 With Front Clamping Spacer &|Y
01|235650|16|5|Clamp Screw as per the BPTL Drawing|Y
01|235650|16|6|Drwg: BT30SM150206-1|Y
01|235650|17|1|A tariff surcharge of 8% will be added to every order|Y
01|235650|17|2|placed after September 1st 2025(until further notice).|Y
01|235650|17|3|This surcharge will be acknowledged upon acceptance|Y
01|235650|17|4|of every order.|Y
01|235651|2|1|A tariff surcharge may be added to this quotation in|Y
01|235651|2|2|the event of a sustained tariff increase on the|Y
01|235651|2|3|importation of this product.  Any surcharge will be|Y
01|235651|2|4|disclosed prior to acceptance of an order.|Y
01|235652|2|1|A tariff surcharge may be added to this quotation in|Y
01|235652|2|2|the event of a sustained tariff increase on the|Y
01|235652|2|3|importation of this product.  Any surcharge will be|Y
01|235652|2|4|disclosed prior to acceptance of an order.|Y
01|235653|9|1|A tariff surcharge may be added to this quotation in|Y
01|235653|9|2|the event of a sustained tariff increase on the|Y
01|235653|9|3|importation of this product.  Any surcharge will be|Y
01|235653|9|4|disclosed prior to acceptance of an order.|Y
01|235654|4|1|On-site repair time.|Y
01|235654|8|1|$1000/Air & Rental Car|Y
01|235654|8|2|$400/Accomodation|Y
01|235654|8|3|$300/Meal & Incidental|Y
01|235655|8|1|A tariff surcharge may be added to this quotation in|Y
01|235655|8|2|the event of a sustained tariff increase on the|Y
01|235655|8|3|importation of this product.  Any surcharge will be|Y
01|235655|8|4|disclosed prior to acceptance of an order.|Y
01|235656|2|1|A tariff surcharge may be added to this quotation in|Y
01|235656|2|2|the event of a sustained tariff increase on the|Y
01|235656|2|3|importation of this product.  Any surcharge will be|Y
01|235656|2|4|disclosed prior to acceptance of an order.|Y
01|235657|11|1|A tariff surcharge may be added to this quotation in|Y
01|235657|11|2|the event of a sustained tariff increase on the|Y
01|235657|11|3|importation of this product.  Any surcharge will be|Y
01|235657|11|4|disclosed prior to acceptance of an order.|Y
01|235658|4|1|A tariff surcharge may be added to this quotation in|Y
01|235658|4|2|the event of a sustained tariff increase on the|Y
01|235658|4|3|importation of this product.  Any surcharge will be|Y
01|235658|4|4|disclosed prior to acceptance of an order.|Y
01|235659|4|1|A tariff surcharge may be added to this quotation in|Y
01|235659|4|2|the event of a sustained tariff increase on the|Y
01|235659|4|3|importation of this product.  Any surcharge will be|Y
01|235659|4|4|disclosed prior to acceptance of an order.|Y
01|235660|2|1|A tariff surcharge may be added to this quotation in|Y
01|235660|2|2|the event of a sustained tariff increase on the|Y
01|235660|2|3|importation of this product.  Any surcharge will be|Y
01|235660|2|4|disclosed prior to acceptance of an order.|Y
01|235662|5|1|Quoted at NET price.|Y
01|235662|6|1|A tariff surcharge may be added to this quotation in|Y
01|235662|6|2|the event of a sustained tariff increase on the|Y
01|235662|6|3|importation of this product.  Any surcharge will be|Y
01|235662|6|4|disclosed prior to acceptance of an order.|Y
01|235663|2|1|A tariff surcharge may be added to this quotation in|Y
01|235663|2|2|the event of a sustained tariff increase on the|Y
01|235663|2|3|importation of this product.  Any surcharge will be|Y
01|235663|2|4|disclosed prior to acceptance of an order.|Y
01|235664|3|1|A tariff surcharge may be added to this quotation in|Y
01|235664|3|2|the event of a sustained tariff increase on the|Y
01|235664|3|3|importation of this product.  Any surcharge will be|Y
01|235664|3|4|disclosed prior to acceptance of an order.|Y
01|235665|2|1|A tariff surcharge may be added to this quotation in|Y
01|235665|2|2|the event of a sustained tariff increase on the|Y
01|235665|2|3|importation of this product.  Any surcharge will be|Y
01|235665|2|4|disclosed prior to acceptance of an order.|Y
01|235666|3|1|LN to make positioning block ~1 week after receipt of|Y
01|235666|3|2|necessary spindle measurements|Y
01|235666|8|1|A tariff surcharge may be added to this quotation in|Y
01|235666|8|2|the event of a sustained tariff increase on the|Y
01|235666|8|3|importation of this product.  Any surcharge will be|Y
01|235666|8|4|disclosed prior to acceptance of an order.|Y
01|235667|2|1|A tariff surcharge may be added to this quotation in|Y
01|235667|2|2|the event of a sustained tariff increase on the|Y
01|235667|2|3|importation of this product.  Any surcharge will be|Y
01|235667|2|4|disclosed prior to acceptance of an order.|Y
01|235668|4|1|A tariff surcharge may be added to this quotation in|Y
01|235668|4|2|the event of a sustained tariff increase on the|Y
01|235668|4|3|importation of this product.  Any surcharge will be|Y
01|235668|4|4|disclosed prior to acceptance of an order.|Y
01|235669|2|1|A tariff surcharge may be added to this quotation in|Y
01|235669|2|2|the event of a sustained tariff increase on the|Y
01|235669|2|3|importation of this product.  Any surcharge will be|Y
01|235669|2|4|disclosed prior to acceptance of an order.|Y
01|235670|2|1|A tariff surcharge may be added to this quotation in|Y
01|235670|2|2|the event of a sustained tariff increase on the|Y
01|235670|2|3|importation of this product.  Any surcharge will be|Y
01|235670|2|4|disclosed prior to acceptance of an order.|Y
01|235671|3|1|A tariff surcharge may be added to this quotation in|Y
01|235671|3|2|the event of a sustained tariff increase on the|Y
01|235671|3|3|importation of this product.  Any surcharge will be|Y
01|235671|3|4|disclosed prior to acceptance of an order.|Y
01|235672|2|1|A tariff surcharge may be added to this quotation in|Y
01|235672|2|2|the event of a sustained tariff increase on the|Y
01|235672|2|3|importation of this product.  Any surcharge will be|Y
01|235672|2|4|disclosed prior to acceptance of an order.|Y
01|235673|4|1|A tariff surcharge may be added to this quotation in|Y
01|235673|4|2|the event of a sustained tariff increase on the|Y
01|235673|4|3|importation of this product.  Any surcharge will be|Y
01|235673|4|4|disclosed prior to acceptance of an order.|Y
01|235674|7|1|A tariff surcharge may be added to this quotation in|Y
01|235674|7|2|the event of a sustained tariff increase on the|Y
01|235674|7|3|importation of this product.  Any surcharge will be|Y
01|235674|7|4|disclosed prior to acceptance of an order.|Y
01|235675|12|1|A tariff surcharge may be added to this quotation in|Y
01|235675|12|2|the event of a sustained tariff increase on the|Y
01|235675|12|3|importation of this product.  Any surcharge will be|Y
01|235675|12|4|disclosed prior to acceptance of an order.|Y
01|235676|6|1|A tariff surcharge may be added to this quotation in|Y
01|235676|6|2|the event of a sustained tariff increase on the|Y
01|235676|6|3|importation of this product.  Any surcharge will be|Y
01|235676|6|4|disclosed prior to acceptance of an order.|Y
01|235677|4|1|A tariff surcharge may be added to this quotation in|Y
01|235677|4|2|the event of a sustained tariff increase on the|Y
01|235677|4|3|importation of this product.  Any surcharge will be|Y
01|235677|4|4|disclosed prior to acceptance of an order.|Y
01|235678|3|1|A tariff surcharge may be added to this quotation in|Y
01|235678|3|2|the event of a sustained tariff increase on the|Y
01|235678|3|3|importation of this product.  Any surcharge will be|Y
01|235678|3|4|disclosed prior to acceptance of an order.|Y
01|235679|2|1|A tariff surcharge may be added to this quotation in|Y
01|235679|2|2|the event of a sustained tariff increase on the|Y
01|235679|2|3|importation of this product.  Any surcharge will be|Y
01|235679|2|4|disclosed prior to acceptance of an order.|Y
01|235680|2|1|A tariff surcharge may be added to this quotation in|Y
01|235680|2|2|the event of a sustained tariff increase on the|Y
01|235680|2|3|importation of this product.  Any surcharge will be|Y
01|235680|2|4|disclosed prior to acceptance of an order.|Y
01|235681|8|1|A tariff surcharge may be added to this quotation in|Y
01|235681|8|2|the event of a sustained tariff increase on the|Y
01|235681|8|3|importation of this product.  Any surcharge will be|Y
01|235681|8|4|disclosed prior to acceptance of an order.|Y
01|235682|2|1|A tariff surcharge may be added to this quotation in|Y
01|235682|2|2|the event of a sustained tariff increase on the|Y
01|235682|2|3|importation of this product.  Any surcharge will be|Y
01|235682|2|4|disclosed prior to acceptance of an order.|Y
01|235683|1|1|Part# 201121|Y
01|235683|1|2|Mazak VDI40 Live Capto C4 X<Radial>STRT Sub Offset|Y
01|235683|1|3|Int/Ext coolant|Y
01|235683|2|1|Part# 196993|Y
01|235683|2|2|Mazak VDI40 Live Capto C4 X<Radial>STRT Offset|Y
01|235683|2|3|Int/Ext coolant|Y
01|235683|7|1|Part# 196991|Y
01|235683|7|2|Mazak VDI40 Live Capto C4 Z<Axial>90D IntExtCool|Y
01|235683|9|1|Part#180103 ER32 angle unit 1:2 ICE|Y
01|235683|9|2|Item can not be cancelled or returned once PO received.|Y
01|235683|10|1|A tariff surcharge may be added to this quotation in|Y
01|235683|10|2|the event of a sustained tariff increase on the|Y
01|235683|10|3|importation of this product.  Any surcharge will be|Y
01|235683|10|4|disclosed prior to acceptance of an order.|Y
01|235684|5|1|A tariff surcharge may be added to this quotation in|Y
01|235684|5|2|the event of a sustained tariff increase on the|Y
01|235684|5|3|importation of this product.  Any surcharge will be|Y
01|235684|5|4|disclosed prior to acceptance of an order.|Y
01|235685|2|1|A tariff surcharge may be added to this quotation in|Y
01|235685|2|2|the event of a sustained tariff increase on the|Y
01|235685|2|3|importation of this product.  Any surcharge will be|Y
01|235685|2|4|disclosed prior to acceptance of an order.|Y
01|235686|2|1|A tariff surcharge may be added to this quotation in|Y
01|235686|2|2|the event of a sustained tariff increase on the|Y
01|235686|2|3|importation of this product.  Any surcharge will be|Y
01|235686|2|4|disclosed prior to acceptance of an order.|Y
01|235687|1|1|Pais de Origen: Japon|Y
01|235687|2|1|Pais de Origen: Japon|Y
01|235687|3|1|Pais de Origen: Japon|Y
01|235687|4|1|Pais de Origen: Japon|Y
01|235687|5|1|Pais de Origen: Japon|Y
01|235687|6|1|Pais de Origen: Japon|Y
01|235687|7|1|Pais de Origen: Japon|Y
01|235687|8|1|A tariff surcharge may be added to this quotation in|Y
01|235687|8|2|the event of a sustained tariff increase on the|Y
01|235687|8|3|importation of this product.  Any surcharge will be|Y
01|235687|8|4|disclosed prior to acceptance of an order.|Y
01|235688|1|1|Pais de Origen: Japon|Y
01|235688|2|1|Pais de Origen: Japon|Y
01|235688|3|1|Pais de Origen: Japon|Y
01|235688|4|1|Pais de Origen: Japon|Y
01|235688|5|1|A tariff surcharge may be added to this quotation in|Y
01|235688|5|2|the event of a sustained tariff increase on the|Y
01|235688|5|3|importation of this product.  Any surcharge will be|Y
01|235688|5|4|disclosed prior to acceptance of an order.|Y
01|235689|1|1|Pais de Origen: Japon|Y
01|235689|2|1|Pais de Origen: Japon|Y
01|235689|3|1|Pais de Origen: Japon|Y
01|235690|16|1|A tariff surcharge may be added to this quotation in|Y
01|235690|16|2|the event of a sustained tariff increase on the|Y
01|235690|16|3|importation of this product.  Any surcharge will be|Y
01|235690|16|4|disclosed prior to acceptance of an order.|Y
01|235691|5|1|A tariff surcharge may be added to this quotation in|Y
01|235691|5|2|the event of a sustained tariff increase on the|Y
01|235691|5|3|importation of this product.  Any surcharge will be|Y
01|235691|5|4|disclosed prior to acceptance of an order.|Y
01|235692|2|1|A tariff surcharge may be added to this quotation in|Y
01|235692|2|2|the event of a sustained tariff increase on the|Y
01|235692|2|3|importation of this product.  Any surcharge will be|Y
01|235692|2|4|disclosed prior to acceptance of an order.|Y
01|235693|2|1|A tariff surcharge may be added to this quotation in|Y
01|235693|2|2|the event of a sustained tariff increase on the|Y
01|235693|2|3|importation of this product.  Any surcharge will be|Y
01|235693|2|4|disclosed prior to acceptance of an order.|Y
01|235694|2|1|A tariff surcharge may be added to this quotation in|Y
01|235694|2|2|the event of a sustained tariff increase on the|Y
01|235694|2|3|importation of this product.  Any surcharge will be|Y
01|235694|2|4|disclosed prior to acceptance of an order.|Y
01|235695|21|1|A tariff surcharge may be added to this quotation in|Y
01|235695|21|2|the event of a sustained tariff increase on the|Y
01|235695|21|3|importation of this product.  Any surcharge will be|Y
01|235695|21|4|disclosed prior to acceptance of an order.|Y
01|235696|2|1|A tariff surcharge may be added to this quotation in|Y
01|235696|2|2|the event of a sustained tariff increase on the|Y
01|235696|2|3|importation of this product.  Any surcharge will be|Y
01|235696|2|4|disclosed prior to acceptance of an order.|Y
01|235697|2|1|A tariff surcharge may be added to this quotation in|Y
01|235697|2|2|the event of a sustained tariff increase on the|Y
01|235697|2|3|importation of this product.  Any surcharge will be|Y
01|235697|2|4|disclosed prior to acceptance of an order.|Y
01|235698|2|1|A tariff surcharge may be added to this quotation in|Y
01|235698|2|2|the event of a sustained tariff increase on the|Y
01|235698|2|3|importation of this product.  Any surcharge will be|Y
01|235698|2|4|disclosed prior to acceptance of an order.|Y
01|235699|4|1|A tariff surcharge may be added to this quotation in|Y
01|235699|4|2|the event of a sustained tariff increase on the|Y
01|235699|4|3|importation of this product.  Any surcharge will be|Y
01|235699|4|4|disclosed prior to acceptance of an order.|Y
01|235700|4|1|A tariff surcharge may be added to this quotation in|Y
01|235700|4|2|the event of a sustained tariff increase on the|Y
01|235700|4|3|importation of this product.  Any surcharge will be|Y
01|235700|4|4|disclosed prior to acceptance of an order.|Y
01|235701|4|1|A tariff surcharge may be added to this quotation in|Y
01|235701|4|2|the event of a sustained tariff increase on the|Y
01|235701|4|3|importation of this product.  Any surcharge will be|Y
01|235701|4|4|disclosed prior to acceptance of an order.|Y
01|235702|27|1|A tariff surcharge may be added to this quotation in|Y
01|235702|27|2|the event of a sustained tariff increase on the|Y
01|235702|27|3|importation of this product.  Any surcharge will be|Y
01|235702|27|4|disclosed prior to acceptance of an order.|Y
01|235703|1|1|We currently have stock at the factory.|Y
01|235703|1|2|The factory is closed from 8/11 to 8/29.  If an order|Y
01|235703|1|3|is placed during this time period estimated lead time|Y
01|235703|1|4|is end of September/early October.|Y
01|235703|6|1|We currently have stock at the factory.|Y
01|235703|6|2|The factory is closed from 8/11 to 8/29.  If an order|Y
01|235703|6|3|is placed during this time period estimated lead time|Y
01|235703|6|4|is end of September/early October.|Y
01|235703|17|1|A tariff surcharge may be added to this quotation in|Y
01|235703|17|2|the event of a sustained tariff increase on the|Y
01|235703|17|3|importation of this product.  Any surcharge will be|Y
01|235703|17|4|disclosed prior to acceptance of an order.|Y
01|235704|3|1|A tariff surcharge may be added to this quotation in|Y
01|235704|3|2|the event of a sustained tariff increase on the|Y
01|235704|3|3|importation of this product.  Any surcharge will be|Y
01|235704|3|4|disclosed prior to acceptance of an order.|Y
01|235705|5|1|A tariff surcharge may be added to this quotation in|Y
01|235705|5|2|the event of a sustained tariff increase on the|Y
01|235705|5|3|importation of this product.  Any surcharge will be|Y
01|235705|5|4|disclosed prior to acceptance of an order.|Y
01|235706|2|1|A tariff surcharge may be added to this quotation in|Y
01|235706|2|2|the event of a sustained tariff increase on the|Y
01|235706|2|3|importation of this product.  Any surcharge will be|Y
01|235706|2|4|disclosed prior to acceptance of an order.|Y
01|235707|2|1|A tariff surcharge may be added to this quotation in|Y
01|235707|2|2|the event of a sustained tariff increase on the|Y
01|235707|2|3|importation of this product.  Any surcharge will be|Y
01|235707|2|4|disclosed prior to acceptance of an order.|Y
01|235708|1|1|**NET Price includes chip BIS-C-122-04/L and install/|Y
01|235708|1|2|rebalance fee.|Y
01|235708|1|3|**Customer to provide SECO CAT50ADB-EM0.750-2.500|Y
01|235708|1|4|holder for installation.|Y
01|235708|2|1|A tariff surcharge of 8% will be added to every order|Y
01|235708|2|2|placed after September 1st 2025(until further notice).|Y
01|235708|2|3|This surcharge will be acknowledged upon acceptance|Y
01|235708|2|4|of every order.|Y
01|235709|25|1|A tariff surcharge may be added to this quotation in|Y
01|235709|25|2|the event of a sustained tariff increase on the|Y
01|235709|25|3|importation of this product.  Any surcharge will be|Y
01|235709|25|4|disclosed prior to acceptance of an order.|Y
01|235710|3|1|A tariff surcharge may be added to this quotation in|Y
01|235710|3|2|the event of a sustained tariff increase on the|Y
01|235710|3|3|importation of this product.  Any surcharge will be|Y
01|235710|3|4|disclosed prior to acceptance of an order.|Y
01|235711|2|1|A tariff surcharge may be added to this quotation in|Y
01|235711|2|2|the event of a sustained tariff increase on the|Y
01|235711|2|3|importation of this product.  Any surcharge will be|Y
01|235711|2|4|disclosed prior to acceptance of an order.|Y
01|235712|2|1|A tariff surcharge may be added to this quotation in|Y
01|235712|2|2|the event of a sustained tariff increase on the|Y
01|235712|2|3|importation of this product.  Any surcharge will be|Y
01|235712|2|4|disclosed prior to acceptance of an order.|Y
01|235713|5|1|A tariff surcharge may be added to this quotation in|Y
01|235713|5|2|the event of a sustained tariff increase on the|Y
01|235713|5|3|importation of this product.  Any surcharge will be|Y
01|235713|5|4|disclosed prior to acceptance of an order.|Y
01|235714|5|1|A tariff surcharge may be added to this quotation in|Y
01|235714|5|2|the event of a sustained tariff increase on the|Y
01|235714|5|3|importation of this product.  Any surcharge will be|Y
01|235714|5|4|disclosed prior to acceptance of an order.|Y
01|235715|6|1|A tariff surcharge may be added to this quotation in|Y
01|235715|6|2|the event of a sustained tariff increase on the|Y
01|235715|6|3|importation of this product.  Any surcharge will be|Y
01|235715|6|4|disclosed prior to acceptance of an order.|Y
01|235716|59|1|THIS WRENCH WORKS WITH BOTH VC13 AND SK16 HOLDERS|Y
01|235716|60|1|A tariff surcharge may be added to this quotation in|Y
01|235716|60|2|the event of a sustained tariff increase on the|Y
01|235716|60|3|importation of this product.  Any surcharge will be|Y
01|235716|60|4|disclosed prior to acceptance of an order.|Y
01|235717|2|1|A tariff surcharge may be added to this quotation in|Y
01|235717|2|2|the event of a sustained tariff increase on the|Y
01|235717|2|3|importation of this product.  Any surcharge will be|Y
01|235717|2|4|disclosed prior to acceptance of an order.|Y
01|235718|2|1|A tariff surcharge may be added to this quotation in|Y
01|235718|2|2|the event of a sustained tariff increase on the|Y
01|235718|2|3|importation of this product.  Any surcharge will be|Y
01|235718|2|4|disclosed prior to acceptance of an order.|Y
01|235719|71|1|A tariff surcharge may be added to this quotation in|Y
01|235719|71|2|the event of a sustained tariff increase on the|Y
01|235719|71|3|importation of this product.  Any surcharge will be|Y
01|235719|71|4|disclosed prior to acceptance of an order.|Y
01|235720|4|1|A tariff surcharge may be added to this quotation in|Y
01|235720|4|2|the event of a sustained tariff increase on the|Y
01|235720|4|3|importation of this product.  Any surcharge will be|Y
01|235720|4|4|disclosed prior to acceptance of an order.|Y
01|235721|7|1|A tariff surcharge may be added to this quotation in|Y
01|235721|7|2|the event of a sustained tariff increase on the|Y
01|235721|7|3|importation of this product.  Any surcharge will be|Y
01|235721|7|4|disclosed prior to acceptance of an order.|Y
01|235722|2|1|A tariff surcharge may be added to this quotation in|Y
01|235722|2|2|the event of a sustained tariff increase on the|Y
01|235722|2|3|importation of this product.  Any surcharge will be|Y
01|235722|2|4|disclosed prior to acceptance of an order.|Y
01|235723|2|1|A tariff surcharge may be added to this quotation in|Y
01|235723|2|2|the event of a sustained tariff increase on the|Y
01|235723|2|3|importation of this product.  Any surcharge will be|Y
01|235723|2|4|disclosed prior to acceptance of an order.|Y
01|235724|2|1|A tariff surcharge may be added to this quotation in|Y
01|235724|2|2|the event of a sustained tariff increase on the|Y
01|235724|2|3|importation of this product.  Any surcharge will be|Y
01|235724|2|4|disclosed prior to acceptance of an order.|Y
01|235725|2|1|A tariff surcharge may be added to this quotation in|Y
01|235725|2|2|the event of a sustained tariff increase on the|Y
01|235725|2|3|importation of this product.  Any surcharge will be|Y
01|235725|2|4|disclosed prior to acceptance of an order.|Y
01|235726|6|1|A tariff surcharge may be added to this quotation in|Y
01|235726|6|2|the event of a sustained tariff increase on the|Y
01|235726|6|3|importation of this product.  Any surcharge will be|Y
01|235726|6|4|disclosed prior to acceptance of an order.|Y
01|235727|2|1|A tariff surcharge may be added to this quotation in|Y
01|235727|2|2|the event of a sustained tariff increase on the|Y
01|235727|2|3|importation of this product.  Any surcharge will be|Y
01|235727|2|4|disclosed prior to acceptance of an order.|Y
01|235728|4|1|A tariff surcharge may be added to this quotation in|Y
01|235728|4|2|the event of a sustained tariff increase on the|Y
01|235728|4|3|importation of this product.  Any surcharge will be|Y
01|235728|4|4|disclosed prior to acceptance of an order.|Y
01|235729|2|1|A tariff surcharge may be added to this quotation in|Y
01|235729|2|2|the event of a sustained tariff increase on the|Y
01|235729|2|3|importation of this product.  Any surcharge will be|Y
01|235729|2|4|disclosed prior to acceptance of an order.|Y
01|235730|2|1|A tariff surcharge may be added to this quotation in|Y
01|235730|2|2|the event of a sustained tariff increase on the|Y
01|235730|2|3|importation of this product.  Any surcharge will be|Y
01|235730|2|4|disclosed prior to acceptance of an order.|Y
01|235731|2|1|A tariff surcharge may be added to this quotation in|Y
01|235731|2|2|the event of a sustained tariff increase on the|Y
01|235731|2|3|importation of this product.  Any surcharge will be|Y
01|235731|2|4|disclosed prior to acceptance of an order.|Y
01|235732|6|1|A tariff surcharge may be added to this quotation in|Y
01|235732|6|2|the event of a sustained tariff increase on the|Y
01|235732|6|3|importation of this product.  Any surcharge will be|Y
01|235732|6|4|disclosed prior to acceptance of an order.|Y
01|235733|2|1|A tariff surcharge may be added to this quotation in|Y
01|235733|2|2|the event of a sustained tariff increase on the|Y
01|235733|2|3|importation of this product.  Any surcharge will be|Y
01|235733|2|4|disclosed prior to acceptance of an order.|Y
01|235734|2|1|A tariff surcharge may be added to this quotation in|Y
01|235734|2|2|the event of a sustained tariff increase on the|Y
01|235734|2|3|importation of this product.  Any surcharge will be|Y
01|235734|2|4|disclosed prior to acceptance of an order.|Y
01|235735|2|1|A tariff surcharge may be added to this quotation in|Y
01|235735|2|2|the event of a sustained tariff increase on the|Y
01|235735|2|3|importation of this product.  Any surcharge will be|Y
01|235735|2|4|disclosed prior to acceptance of an order.|Y
01|235736|2|1|A tariff surcharge may be added to this quotation in|Y
01|235736|2|2|the event of a sustained tariff increase on the|Y
01|235736|2|3|importation of this product.  Any surcharge will be|Y
01|235736|2|4|disclosed prior to acceptance of an order.|Y
01|235737|2|1|A tariff surcharge may be added to this quotation in|Y
01|235737|2|2|the event of a sustained tariff increase on the|Y
01|235737|2|3|importation of this product.  Any surcharge will be|Y
01|235737|2|4|disclosed prior to acceptance of an order.|Y
01|235738|2|1|A tariff surcharge may be added to this quotation in|Y
01|235738|2|2|the event of a sustained tariff increase on the|Y
01|235738|2|3|importation of this product.  Any surcharge will be|Y
01|235738|2|4|disclosed prior to acceptance of an order.|Y
01|235739|1|1|P/N: TBD|Y
01|235739|1|2|5C special collet with ID Bore to be ground to .190|Y
01|235739|2|1|A tariff surcharge may be added to this quotation in|Y
01|235739|2|2|the event of a sustained tariff increase on the|Y
01|235739|2|3|importation of this product.  Any surcharge will be|Y
01|235739|2|4|disclosed prior to acceptance of an order.|Y
01|235740|2|1|A tariff surcharge may be added to this quotation in|Y
01|235740|2|2|the event of a sustained tariff increase on the|Y
01|235740|2|3|importation of this product.  Any surcharge will be|Y
01|235740|2|4|disclosed prior to acceptance of an order.|Y
01|235741|3|1|A tariff surcharge may be added to this quotation in|Y
01|235741|3|2|the event of a sustained tariff increase on the|Y
01|235741|3|3|importation of this product.  Any surcharge will be|Y
01|235741|3|4|disclosed prior to acceptance of an order.|Y
01|235742|3|1|A tariff surcharge may be added to this quotation in|Y
01|235742|3|2|the event of a sustained tariff increase on the|Y
01|235742|3|3|importation of this product.  Any surcharge will be|Y
01|235742|3|4|disclosed prior to acceptance of an order.|Y
01|235743|1|1|KYOQ2507-0306 0001|Y
01|235743|2|1|A tariff surcharge may be added to this quotation in|Y
01|235743|2|2|the event of a sustained tariff increase on the|Y
01|235743|2|3|importation of this product.  Any surcharge will be|Y
01|235743|2|4|disclosed prior to acceptance of an order.|Y
01|235744|4|1|A tariff surcharge may be added to this quotation in|Y
01|235744|4|2|the event of a sustained tariff increase on the|Y
01|235744|4|3|importation of this product.  Any surcharge will be|Y
01|235744|4|4|disclosed prior to acceptance of an order.|Y
01|235745|2|1|A tariff surcharge may be added to this quotation in|Y
01|235745|2|2|the event of a sustained tariff increase on the|Y
01|235745|2|3|importation of this product.  Any surcharge will be|Y
01|235745|2|4|disclosed prior to acceptance of an order.|Y
01|235746|2|1|Quoted at NET price.|Y
01|235746|3|1|A tariff surcharge may be added to this quotation in|Y
01|235746|3|2|the event of a sustained tariff increase on the|Y
01|235746|3|3|importation of this product.  Any surcharge will be|Y
01|235746|3|4|disclosed prior to acceptance of an order.|Y
01|235747|3|1|A tariff surcharge may be added to this quotation in|Y
01|235747|3|2|the event of a sustained tariff increase on the|Y
01|235747|3|3|importation of this product.  Any surcharge will be|Y
01|235747|3|4|disclosed prior to acceptance of an order.|Y
01|235748|11|1|A tariff surcharge may be added to this quotation in|Y
01|235748|11|2|the event of a sustained tariff increase on the|Y
01|235748|11|3|importation of this product.  Any surcharge will be|Y
01|235748|11|4|disclosed prior to acceptance of an order.|Y
01|235749|2|1|A tariff surcharge may be added to this quotation in|Y
01|235749|2|2|the event of a sustained tariff increase on the|Y
01|235749|2|3|importation of this product.  Any surcharge will be|Y
01|235749|2|4|disclosed prior to acceptance of an order.|Y
01|235750|18|1|A tariff surcharge may be added to this quotation in|Y
01|235750|18|2|the event of a sustained tariff increase on the|Y
01|235750|18|3|importation of this product.  Any surcharge will be|Y
01|235750|18|4|disclosed prior to acceptance of an order.|Y
01|235751|6|1|A tariff surcharge may be added to this quotation in|Y
01|235751|6|2|the event of a sustained tariff increase on the|Y
01|235751|6|3|importation of this product.  Any surcharge will be|Y
01|235751|6|4|disclosed prior to acceptance of an order.|Y
01|235752|3|1|A tariff surcharge may be added to this quotation in|Y
01|235752|3|2|the event of a sustained tariff increase on the|Y
01|235752|3|3|importation of this product.  Any surcharge will be|Y
01|235752|3|4|disclosed prior to acceptance of an order.|Y
01|235753|2|1|A tariff surcharge may be added to this quotation in|Y
01|235753|2|2|the event of a sustained tariff increase on the|Y
01|235753|2|3|importation of this product.  Any surcharge will be|Y
01|235753|2|4|disclosed prior to acceptance of an order.|Y
01|235754|2|1|A tariff surcharge may be added to this quotation in|Y
01|235754|2|2|the event of a sustained tariff increase on the|Y
01|235754|2|3|importation of this product.  Any surcharge will be|Y
01|235754|2|4|disclosed prior to acceptance of an order.|Y
01|235755|2|1|A tariff surcharge may be added to this quotation in|Y
01|235755|2|2|the event of a sustained tariff increase on the|Y
01|235755|2|3|importation of this product.  Any surcharge will be|Y
01|235755|2|4|disclosed prior to acceptance of an order.|Y
01|235756|5|1|A tariff surcharge may be added to this quotation in|Y
01|235756|5|2|the event of a sustained tariff increase on the|Y
01|235756|5|3|importation of this product.  Any surcharge will be|Y
01|235756|5|4|disclosed prior to acceptance of an order.|Y
01|235757|2|1|A tariff surcharge may be added to this quotation in|Y
01|235757|2|2|the event of a sustained tariff increase on the|Y
01|235757|2|3|importation of this product.  Any surcharge will be|Y
01|235757|2|4|disclosed prior to acceptance of an order.|Y
01|235758|2|1|A tariff surcharge may be added to this quotation in|Y
01|235758|2|2|the event of a sustained tariff increase on the|Y
01|235758|2|3|importation of this product.  Any surcharge will be|Y
01|235758|2|4|disclosed prior to acceptance of an order.|Y
01|235759|1|1|Final Part# TBD (H018M15 O-XXXX)  **NET Price**|Y
01|235759|1|2|H018M15 Chuck special design for M130xP2.0 draw screw|Y
01|235759|1|3|+ A11 Adapter Plate|Y
01|235759|1|4|**This tool is special for custom application - cannot|Y
01|235759|1|5|be cancelled or returned upon receipt of a PO**|Y
01|235759|7|1|A tariff surcharge may be added to this quotation in|Y
01|235759|7|2|the event of a sustained tariff increase on the|Y
01|235759|7|3|importation of this product.  Any surcharge will be|Y
01|235759|7|4|disclosed prior to acceptance of an order.|Y
01|235760|12|1|A tariff surcharge may be added to this quotation in|Y
01|235760|12|2|the event of a sustained tariff increase on the|Y
01|235760|12|3|importation of this product.  Any surcharge will be|Y
01|235760|12|4|disclosed prior to acceptance of an order.|Y
01|235761|11|1|A tariff surcharge may be added to this quotation in|Y
01|235761|11|2|the event of a sustained tariff increase on the|Y
01|235761|11|3|importation of this product.  Any surcharge will be|Y
01|235761|11|4|disclosed prior to acceptance of an order.|Y
01|235762|6|1|A tariff surcharge may be added to this quotation in|Y
01|235762|6|2|the event of a sustained tariff increase on the|Y
01|235762|6|3|importation of this product.  Any surcharge will be|Y
01|235762|6|4|disclosed prior to acceptance of an order.|Y
01|235763|5|1|A tariff surcharge may be added to this quotation in|Y
01|235763|5|2|the event of a sustained tariff increase on the|Y
01|235763|5|3|importation of this product.  Any surcharge will be|Y
01|235763|5|4|disclosed prior to acceptance of an order.|Y
01|235764|1|1|ST10-SF10-6.00|Y
01|235764|1|2|1 Straight Shank Extension Shrink Fit Holder 10mm|Y
01|235764|1|3|6 gage length|Y
01|235764|1|4|*Lead time given as ADA - After Signed Drawing Approval|Y
01|235764|1|5|Please allow 1-2 weeks for procurement of approval dwg.|Y
01|235764|1|6|**Quoted at NET price. Minimum Order Quantity of 5 pcs.|Y
01|235764|2|1|A tariff surcharge may be added to this quotation in|Y
01|235764|2|2|the event of a sustained tariff increase on the|Y
01|235764|2|3|importation of this product.  Any surcharge will be|Y
01|235764|2|4|disclosed prior to acceptance of an order.|Y
01|235765|2|1|A tariff surcharge may be added to this quotation in|Y
01|235765|2|2|the event of a sustained tariff increase on the|Y
01|235765|2|3|importation of this product.  Any surcharge will be|Y
01|235765|2|4|disclosed prior to acceptance of an order.|Y
01|235766|2|1|A tariff surcharge may be added to this quotation in|Y
01|235766|2|2|the event of a sustained tariff increase on the|Y
01|235766|2|3|importation of this product.  Any surcharge will be|Y
01|235766|2|4|disclosed prior to acceptance of an order.|Y
01|235767|2|1|A tariff surcharge may be added to this quotation in|Y
01|235767|2|2|the event of a sustained tariff increase on the|Y
01|235767|2|3|importation of this product.  Any surcharge will be|Y
01|235767|2|4|disclosed prior to acceptance of an order.|Y
01|235768|3|1|A tariff surcharge may be added to this quotation in|Y
01|235768|3|2|the event of a sustained tariff increase on the|Y
01|235768|3|3|importation of this product.  Any surcharge will be|Y
01|235768|3|4|disclosed prior to acceptance of an order.|Y
01|235769|2|1|A tariff surcharge may be added to this quotation in|Y
01|235769|2|2|the event of a sustained tariff increase on the|Y
01|235769|2|3|importation of this product.  Any surcharge will be|Y
01|235769|2|4|disclosed prior to acceptance of an order.|Y
01|235770|3|1|A tariff surcharge may be added to this quotation in|Y
01|235770|3|2|the event of a sustained tariff increase on the|Y
01|235770|3|3|importation of this product.  Any surcharge will be|Y
01|235770|3|4|disclosed prior to acceptance of an order.|Y
01|235771|2|1|A tariff surcharge may be added to this quotation in|Y
01|235771|2|2|the event of a sustained tariff increase on the|Y
01|235771|2|3|importation of this product.  Any surcharge will be|Y
01|235771|2|4|disclosed prior to acceptance of an order.|Y
01|235772|3|1|A tariff surcharge may be added to this quotation in|Y
01|235772|3|2|the event of a sustained tariff increase on the|Y
01|235772|3|3|importation of this product.  Any surcharge will be|Y
01|235772|3|4|disclosed prior to acceptance of an order.|Y
01|235773|3|1|A tariff surcharge may be added to this quotation in|Y
01|235773|3|2|the event of a sustained tariff increase on the|Y
01|235773|3|3|importation of this product.  Any surcharge will be|Y
01|235773|3|4|disclosed prior to acceptance of an order.|Y
01|235774|6|1|A tariff surcharge may be added to this quotation in|Y
01|235774|6|2|the event of a sustained tariff increase on the|Y
01|235774|6|3|importation of this product.  Any surcharge will be|Y
01|235774|6|4|disclosed prior to acceptance of an order.|Y
01|235775|2|1|A tariff surcharge may be added to this quotation in|Y
01|235775|2|2|the event of a sustained tariff increase on the|Y
01|235775|2|3|importation of this product.  Any surcharge will be|Y
01|235775|2|4|disclosed prior to acceptance of an order.|Y
01|235777|2|1|A tariff surcharge may be added to this quotation in|Y
01|235777|2|2|the event of a sustained tariff increase on the|Y
01|235777|2|3|importation of this product.  Any surcharge will be|Y
01|235777|2|4|disclosed prior to acceptance of an order.|Y
01|235778|3|1|A tariff surcharge may be added to this quotation in|Y
01|235778|3|2|the event of a sustained tariff increase on the|Y
01|235778|3|3|importation of this product.  Any surcharge will be|Y
01|235778|3|4|disclosed prior to acceptance of an order.|Y
01|235779|2|1|A tariff surcharge may be added to this quotation in|Y
01|235779|2|2|the event of a sustained tariff increase on the|Y
01|235779|2|3|importation of this product.  Any surcharge will be|Y
01|235779|2|4|disclosed prior to acceptance of an order.|Y
01|235780|2|1|A tariff surcharge may be added to this quotation in|Y
01|235780|2|2|the event of a sustained tariff increase on the|Y
01|235780|2|3|importation of this product.  Any surcharge will be|Y
01|235780|2|4|disclosed prior to acceptance of an order.|Y
01|235781|3|1|A tariff surcharge may be added to this quotation in|Y
01|235781|3|2|the event of a sustained tariff increase on the|Y
01|235781|3|3|importation of this product.  Any surcharge will be|Y
01|235781|3|4|disclosed prior to acceptance of an order.|Y
01|235782|2|1|A tariff surcharge may be added to this quotation in|Y
01|235782|2|2|the event of a sustained tariff increase on the|Y
01|235782|2|3|importation of this product.  Any surcharge will be|Y
01|235782|2|4|disclosed prior to acceptance of an order.|Y
01|235783|4|1|A tariff surcharge may be added to this quotation in|Y
01|235783|4|2|the event of a sustained tariff increase on the|Y
01|235783|4|3|importation of this product.  Any surcharge will be|Y
01|235783|4|4|disclosed prior to acceptance of an order.|Y
01|235784|5|1|A tariff surcharge may be added to this quotation in|Y
01|235784|5|2|the event of a sustained tariff increase on the|Y
01|235784|5|3|importation of this product.  Any surcharge will be|Y
01|235784|5|4|disclosed prior to acceptance of an order.|Y
01|235785|2|1|A tariff surcharge may be added to this quotation in|Y
01|235785|2|2|the event of a sustained tariff increase on the|Y
01|235785|2|3|importation of this product.  Any surcharge will be|Y
01|235785|2|4|disclosed prior to acceptance of an order.|Y
01|235787|2|1|A tariff surcharge may be added to this quotation in|Y
01|235787|2|2|the event of a sustained tariff increase on the|Y
01|235787|2|3|importation of this product.  Any surcharge will be|Y
01|235787|2|4|disclosed prior to acceptance of an order.|Y
01|235788|2|1|A tariff surcharge may be added to this quotation in|Y
01|235788|2|2|the event of a sustained tariff increase on the|Y
01|235788|2|3|importation of this product.  Any surcharge will be|Y
01|235788|2|4|disclosed prior to acceptance of an order.|Y
01|235789|2|1|A tariff surcharge may be added to this quotation in|Y
01|235789|2|2|the event of a sustained tariff increase on the|Y
01|235789|2|3|importation of this product.  Any surcharge will be|Y
01|235789|2|4|disclosed prior to acceptance of an order.|Y
01|235790|5|1|A tariff surcharge of 8% will be added to every order|Y
01|235790|5|2|placed after September 1st 2025(until further notice).|Y
01|235790|5|3|This surcharge will be acknowledged upon acceptance|Y
01|235790|5|4|of every order.|Y
01|235791|2|1|A tariff surcharge may be added to this quotation in|Y
01|235791|2|2|the event of a sustained tariff increase on the|Y
01|235791|2|3|importation of this product.  Any surcharge will be|Y
01|235791|2|4|disclosed prior to acceptance of an order.|Y
01|235792|2|1|A tariff surcharge may be added to this quotation in|Y
01|235792|2|2|the event of a sustained tariff increase on the|Y
01|235792|2|3|importation of this product.  Any surcharge will be|Y
01|235792|2|4|disclosed prior to acceptance of an order.|Y
01|235793|2|1|A tariff surcharge may be added to this quotation in|Y
01|235793|2|2|the event of a sustained tariff increase on the|Y
01|235793|2|3|importation of this product.  Any surcharge will be|Y
01|235793|2|4|disclosed prior to acceptance of an order.|Y
01|235794|5|1|A tariff surcharge may be added to this quotation in|Y
01|235794|5|2|the event of a sustained tariff increase on the|Y
01|235794|5|3|importation of this product.  Any surcharge will be|Y
01|235794|5|4|disclosed prior to acceptance of an order.|Y
01|235795|2|1|A tariff surcharge may be added to this quotation in|Y
01|235795|2|2|the event of a sustained tariff increase on the|Y
01|235795|2|3|importation of this product.  Any surcharge will be|Y
01|235795|2|4|disclosed prior to acceptance of an order.|Y
01|235796|1|1|RGA#TOR-62140/|Y
01|235796|1|2|Repair of CAT50-C1.1/4-105U-IDU|Y
01|235796|5|1|A tariff surcharge may be added to this quotation in|Y
01|235796|5|2|the event of a sustained tariff increase on the|Y
01|235796|5|3|importation of this product.  Any surcharge will be|Y
01|235796|5|4|disclosed prior to acceptance of an order.|Y
01|235797|5|1|NBT50-FMC22-105|Y
01|235797|5|2|NBT50 DualContact Shell Mill Holder 22mm Coolant Ports|Y
01|235797|6|1|NBT50-FMH22-47-105|Y
01|235797|6|2|NBT50 DualContact Shell Mill Holder 22mm Coolnatports|Y
01|235797|38|1|A tariff surcharge of 8% will be added to every order|Y
01|235797|38|2|placed after September 1st 2025(until further notice).|Y
01|235797|38|3|This surcharge will be acknowledged upon acceptance|Y
01|235797|38|4|of every order.|Y
01|235798|1|1|Tariff Code: 8466.10.0175/Country of Origin: Japan|Y
01|235798|4|1|A tariff surcharge may be added to this quotation in|Y
01|235798|4|2|the event of a sustained tariff increase on the|Y
01|235798|4|3|importation of this product.  Any surcharge will be|Y
01|235798|4|4|disclosed prior to acceptance of an order.|Y
01|235799|1|1|Miminum Order Quantity 50: discount 30%|Y
01|235799|1|2|Miminum Order Quantity 1-49: discount 25%|Y
01|235799|3|1|A tariff surcharge may be added to this quotation in|Y
01|235799|3|2|the event of a sustained tariff increase on the|Y
01|235799|3|3|importation of this product.  Any surcharge will be|Y
01|235799|3|4|disclosed prior to acceptance of an order.|Y
01|235800|2|1|A tariff surcharge may be added to this quotation in|Y
01|235800|2|2|the event of a sustained tariff increase on the|Y
01|235800|2|3|importation of this product.  Any surcharge will be|Y
01|235800|2|4|disclosed prior to acceptance of an order.|Y
01|235801|2|1|A tariff surcharge may be added to this quotation in|Y
01|235801|2|2|the event of a sustained tariff increase on the|Y
01|235801|2|3|importation of this product.  Any surcharge will be|Y
01|235801|2|4|disclosed prior to acceptance of an order.|Y
01|235802|3|1|A tariff surcharge may be added to this quotation in|Y
01|235802|3|2|the event of a sustained tariff increase on the|Y
01|235802|3|3|importation of this product.  Any surcharge will be|Y
01|235802|3|4|disclosed prior to acceptance of an order.|Y
01|235803|2|1|A tariff surcharge may be added to this quotation in|Y
01|235803|2|2|the event of a sustained tariff increase on the|Y
01|235803|2|3|importation of this product.  Any surcharge will be|Y
01|235803|2|4|disclosed prior to acceptance of an order.|Y
01|235804|2|1|A tariff surcharge may be added to this quotation in|Y
01|235804|2|2|the event of a sustained tariff increase on the|Y
01|235804|2|3|importation of this product.  Any surcharge will be|Y
01|235804|2|4|disclosed prior to acceptance of an order.|Y
01|235805|2|1|A tariff surcharge may be added to this quotation in|Y
01|235805|2|2|the event of a sustained tariff increase on the|Y
01|235805|2|3|importation of this product.  Any surcharge will be|Y
01|235805|2|4|disclosed prior to acceptance of an order.|Y
01|235806|3|1|A tariff surcharge may be added to this quotation in|Y
01|235806|3|2|the event of a sustained tariff increase on the|Y
01|235806|3|3|importation of this product.  Any surcharge will be|Y
01|235806|3|4|disclosed prior to acceptance of an order.|Y
01|235807|2|1|A tariff surcharge may be added to this quotation in|Y
01|235807|2|2|the event of a sustained tariff increase on the|Y
01|235807|2|3|importation of this product.  Any surcharge will be|Y
01|235807|2|4|disclosed prior to acceptance of an order.|Y
01|235808|1|1|FOR DN SVM4100 W/ FANUC Oi-MF+|Y
01|235808|5|1|A tariff surcharge may be added to this quotation in|Y
01|235808|5|2|the event of a sustained tariff increase on the|Y
01|235808|5|3|importation of this product.  Any surcharge will be|Y
01|235808|5|4|disclosed prior to acceptance of an order.|Y
01|235809|2|1|A tariff surcharge may be added to this quotation in|Y
01|235809|2|2|the event of a sustained tariff increase on the|Y
01|235809|2|3|importation of this product.  Any surcharge will be|Y
01|235809|2|4|disclosed prior to acceptance of an order.|Y
01|235810|3|1|A tariff surcharge may be added to this quotation in|Y
01|235810|3|2|the event of a sustained tariff increase on the|Y
01|235810|3|3|importation of this product.  Any surcharge will be|Y
01|235810|3|4|disclosed prior to acceptance of an order.|Y
01|235811|3|1|A tariff surcharge may be added to this quotation in|Y
01|235811|3|2|the event of a sustained tariff increase on the|Y
01|235811|3|3|importation of this product.  Any surcharge will be|Y
01|235811|3|4|disclosed prior to acceptance of an order.|Y
01|235812|2|1|A tariff surcharge may be added to this quotation in|Y
01|235812|2|2|the event of a sustained tariff increase on the|Y
01|235812|2|3|importation of this product.  Any surcharge will be|Y
01|235812|2|4|disclosed prior to acceptance of an order.|Y
01|235813|2|1|A tariff surcharge may be added to this quotation in|Y
01|235813|2|2|the event of a sustained tariff increase on the|Y
01|235813|2|3|importation of this product.  Any surcharge will be|Y
01|235813|2|4|disclosed prior to acceptance of an order.|Y
01|235814|3|1|A tariff surcharge may be added to this quotation in|Y
01|235814|3|2|the event of a sustained tariff increase on the|Y
01|235814|3|3|importation of this product.  Any surcharge will be|Y
01|235814|3|4|disclosed prior to acceptance of an order.|Y
01|235815|5|1|A tariff surcharge may be added to this quotation in|Y
01|235815|5|2|the event of a sustained tariff increase on the|Y
01|235815|5|3|importation of this product.  Any surcharge will be|Y
01|235815|5|4|disclosed prior to acceptance of an order.|Y
01|235816|2|1|A tariff surcharge may be added to this quotation in|Y
01|235816|2|2|the event of a sustained tariff increase on the|Y
01|235816|2|3|importation of this product.  Any surcharge will be|Y
01|235816|2|4|disclosed prior to acceptance of an order.|Y
01|235817|6|1|A tariff surcharge may be added to this quotation in|Y
01|235817|6|2|the event of a sustained tariff increase on the|Y
01|235817|6|3|importation of this product.  Any surcharge will be|Y
01|235817|6|4|disclosed prior to acceptance of an order.|Y
01|235818|2|1|A tariff surcharge may be added to this quotation in|Y
01|235818|2|2|the event of a sustained tariff increase on the|Y
01|235818|2|3|importation of this product.  Any surcharge will be|Y
01|235818|2|4|disclosed prior to acceptance of an order.|Y
01|235819|2|1|A tariff surcharge may be added to this quotation in|Y
01|235819|2|2|the event of a sustained tariff increase on the|Y
01|235819|2|3|importation of this product.  Any surcharge will be|Y
01|235819|2|4|disclosed prior to acceptance of an order.|Y
01|235820|1|1|**NET Price - includes cost of holder + 4-hole DIN|Y
01|235820|1|2|Modification fee**|Y
01|235820|1|3|Cannot be cancelled or returned upon receipt of a PO.|Y
01|235820|2|1|A tariff surcharge may be added to this quotation in|Y
01|235820|2|2|the event of a sustained tariff increase on the|Y
01|235820|2|3|importation of this product.  Any surcharge will be|Y
01|235820|2|4|disclosed prior to acceptance of an order.|Y
01|235821|8|1|A tariff surcharge may be added to this quotation in|Y
01|235821|8|2|the event of a sustained tariff increase on the|Y
01|235821|8|3|importation of this product.  Any surcharge will be|Y
01|235821|8|4|disclosed prior to acceptance of an order.|Y
01|235822|2|1|A tariff surcharge may be added to this quotation in|Y
01|235822|2|2|the event of a sustained tariff increase on the|Y
01|235822|2|3|importation of this product.  Any surcharge will be|Y
01|235822|2|4|disclosed prior to acceptance of an order.|Y
01|235823|2|1|A tariff surcharge may be added to this quotation in|Y
01|235823|2|2|the event of a sustained tariff increase on the|Y
01|235823|2|3|importation of this product.  Any surcharge will be|Y
01|235823|2|4|disclosed prior to acceptance of an order.|Y
01|235824|46|1|A tariff surcharge may be added to this quotation in|Y
01|235824|46|2|the event of a sustained tariff increase on the|Y
01|235824|46|3|importation of this product.  Any surcharge will be|Y
01|235824|46|4|disclosed prior to acceptance of an order.|Y
01|235825|2|1|A tariff surcharge may be added to this quotation in|Y
01|235825|2|2|the event of a sustained tariff increase on the|Y
01|235825|2|3|importation of this product.  Any surcharge will be|Y
01|235825|2|4|disclosed prior to acceptance of an order.|Y
01|235826|2|1|A tariff surcharge may be added to this quotation in|Y
01|235826|2|2|the event of a sustained tariff increase on the|Y
01|235826|2|3|importation of this product.  Any surcharge will be|Y
01|235826|2|4|disclosed prior to acceptance of an order.|Y
01|235827|5|1|A tariff surcharge may be added to this quotation in|Y
01|235827|5|2|the event of a sustained tariff increase on the|Y
01|235827|5|3|importation of this product.  Any surcharge will be|Y
01|235827|5|4|disclosed prior to acceptance of an order.|Y
01|235828|5|1|A tariff surcharge may be added to this quotation in|Y
01|235828|5|2|the event of a sustained tariff increase on the|Y
01|235828|5|3|importation of this product.  Any surcharge will be|Y
01|235828|5|4|disclosed prior to acceptance of an order.|Y
01|235829|2|1|**Special non-standard stock. Cannot be cancelled or|Y
01|235829|2|2|returned upon receipt of PO**|Y
01|235829|3|1|A tariff surcharge may be added to this quotation in|Y
01|235829|3|2|the event of a sustained tariff increase on the|Y
01|235829|3|3|importation of this product.  Any surcharge will be|Y
01|235829|3|4|disclosed prior to acceptance of an order.|Y
01|235830|19|1|A tariff surcharge may be added to this quotation in|Y
01|235830|19|2|the event of a sustained tariff increase on the|Y
01|235830|19|3|importation of this product.  Any surcharge will be|Y
01|235830|19|4|disclosed prior to acceptance of an order.|Y
01|235831|2|1|A tariff surcharge may be added to this quotation in|Y
01|235831|2|2|the event of a sustained tariff increase on the|Y
01|235831|2|3|importation of this product.  Any surcharge will be|Y
01|235831|2|4|disclosed prior to acceptance of an order.|Y
01|235832|18|1|A tariff surcharge may be added to this quotation in|Y
01|235832|18|2|the event of a sustained tariff increase on the|Y
01|235832|18|3|importation of this product.  Any surcharge will be|Y
01|235832|18|4|disclosed prior to acceptance of an order.|Y
01|235833|2|1|A tariff surcharge may be added to this quotation in|Y
01|235833|2|2|the event of a sustained tariff increase on the|Y
01|235833|2|3|importation of this product.  Any surcharge will be|Y
01|235833|2|4|disclosed prior to acceptance of an order.|Y
01|235834|2|1|A tariff surcharge may be added to this quotation in|Y
01|235834|2|2|the event of a sustained tariff increase on the|Y
01|235834|2|3|importation of this product.  Any surcharge will be|Y
01|235834|2|4|disclosed prior to acceptance of an order.|Y
01|235835|3|1|A tariff surcharge may be added to this quotation in|Y
01|235835|3|2|the event of a sustained tariff increase on the|Y
01|235835|3|3|importation of this product.  Any surcharge will be|Y
01|235835|3|4|disclosed prior to acceptance of an order.|Y
01|235836|23|1|A tariff surcharge may be added to this quotation in|Y
01|235836|23|2|the event of a sustained tariff increase on the|Y
01|235836|23|3|importation of this product.  Any surcharge will be|Y
01|235836|23|4|disclosed prior to acceptance of an order.|Y
01|235837|2|1|A tariff surcharge may be added to this quotation in|Y
01|235837|2|2|the event of a sustained tariff increase on the|Y
01|235837|2|3|importation of this product.  Any surcharge will be|Y
01|235837|2|4|disclosed prior to acceptance of an order.|Y
01|235838|2|1|A tariff surcharge may be added to this quotation in|Y
01|235838|2|2|the event of a sustained tariff increase on the|Y
01|235838|2|3|importation of this product.  Any surcharge will be|Y
01|235838|2|4|disclosed prior to acceptance of an order.|Y
01|235839|2|1|A tariff surcharge may be added to this quotation in|Y
01|235839|2|2|the event of a sustained tariff increase on the|Y
01|235839|2|3|importation of this product.  Any surcharge will be|Y
01|235839|2|4|disclosed prior to acceptance of an order.|Y
01|235840|2|1|A tariff surcharge may be added to this quotation in|Y
01|235840|2|2|the event of a sustained tariff increase on the|Y
01|235840|2|3|importation of this product.  Any surcharge will be|Y
01|235840|2|4|disclosed prior to acceptance of an order.|Y
01|235841|3|1|A tariff surcharge may be added to this quotation in|Y
01|235841|3|2|the event of a sustained tariff increase on the|Y
01|235841|3|3|importation of this product.  Any surcharge will be|Y
01|235841|3|4|disclosed prior to acceptance of an order.|Y
01|235842|23|1|A tariff surcharge may be added to this quotation in|Y
01|235842|23|2|the event of a sustained tariff increase on the|Y
01|235842|23|3|importation of this product.  Any surcharge will be|Y
01|235842|23|4|disclosed prior to acceptance of an order.|Y
01|235843|5|1|A tariff surcharge may be added to this quotation in|Y
01|235843|5|2|the event of a sustained tariff increase on the|Y
01|235843|5|3|importation of this product.  Any surcharge will be|Y
01|235843|5|4|disclosed prior to acceptance of an order.|Y
01|235844|5|1|We currently have one (1) in stock in IL and the|Y
01|235844|5|2|balance of one (1) at the factory.  Estimated lead|Y
01|235844|5|3|time for the balance of one (1) will be mid/end of|Y
01|235844|5|4|August. This holder is special non-standard stock.|Y
01|235844|5|5|Once a Purchase Order has been received it cannot be|Y
01|235844|5|6|cancelled or returned.|Y
01|235844|13|1|A tariff surcharge may be added to this quotation in|Y
01|235844|13|2|the event of a sustained tariff increase on the|Y
01|235844|13|3|importation of this product.  Any surcharge will be|Y
01|235844|13|4|disclosed prior to acceptance of an order.|Y
01|235846|4|1|A tariff surcharge may be added to this quotation in|Y
01|235846|4|2|the event of a sustained tariff increase on the|Y
01|235846|4|3|importation of this product.  Any surcharge will be|Y
01|235846|4|4|disclosed prior to acceptance of an order.|Y
01|235847|2|1|A tariff surcharge may be added to this quotation in|Y
01|235847|2|2|the event of a sustained tariff increase on the|Y
01|235847|2|3|importation of this product.  Any surcharge will be|Y
01|235847|2|4|disclosed prior to acceptance of an order.|Y
01|235848|2|1|A tariff surcharge may be added to this quotation in|Y
01|235848|2|2|the event of a sustained tariff increase on the|Y
01|235848|2|3|importation of this product.  Any surcharge will be|Y
01|235848|2|4|disclosed prior to acceptance of an order.|Y
01|235849|2|1|A tariff surcharge may be added to this quotation in|Y
01|235849|2|2|the event of a sustained tariff increase on the|Y
01|235849|2|3|importation of this product.  Any surcharge will be|Y
01|235849|2|4|disclosed prior to acceptance of an order.|Y
01|235850|2|1|A tariff surcharge may be added to this quotation in|Y
01|235850|2|2|the event of a sustained tariff increase on the|Y
01|235850|2|3|importation of this product.  Any surcharge will be|Y
01|235850|2|4|disclosed prior to acceptance of an order.|Y
01|235851|2|1|A tariff surcharge may be added to this quotation in|Y
01|235851|2|2|the event of a sustained tariff increase on the|Y
01|235851|2|3|importation of this product.  Any surcharge will be|Y
01|235851|2|4|disclosed prior to acceptance of an order.|Y
01|235852|4|1|A tariff surcharge may be added to this quotation in|Y
01|235852|4|2|the event of a sustained tariff increase on the|Y
01|235852|4|3|importation of this product.  Any surcharge will be|Y
01|235852|4|4|disclosed prior to acceptance of an order.|Y
01|235853|2|1|A tariff surcharge may be added to this quotation in|Y
01|235853|2|2|the event of a sustained tariff increase on the|Y
01|235853|2|3|importation of this product.  Any surcharge will be|Y
01|235853|2|4|disclosed prior to acceptance of an order.|Y
01|235854|2|1|A tariff surcharge may be added to this quotation in|Y
01|235854|2|2|the event of a sustained tariff increase on the|Y
01|235854|2|3|importation of this product.  Any surcharge will be|Y
01|235854|2|4|disclosed prior to acceptance of an order.|Y
01|235855|2|1|A tariff surcharge may be added to this quotation in|Y
01|235855|2|2|the event of a sustained tariff increase on the|Y
01|235855|2|3|importation of this product.  Any surcharge will be|Y
01|235855|2|4|disclosed prior to acceptance of an order.|Y
01|235856|9|1|A tariff surcharge of 8% will be added to every order|Y
01|235856|9|2|placed after September 1st 2025(until further notice).|Y
01|235856|9|3|This surcharge will be acknowledged upon acceptance|Y
01|235856|9|4|of every order.|Y
01|235857|2|1|A tariff surcharge may be added to this quotation in|Y
01|235857|2|2|the event of a sustained tariff increase on the|Y
01|235857|2|3|importation of this product.  Any surcharge will be|Y
01|235857|2|4|disclosed prior to acceptance of an order.|Y
01|235858|3|1|A tariff surcharge may be added to this quotation in|Y
01|235858|3|2|the event of a sustained tariff increase on the|Y
01|235858|3|3|importation of this product.  Any surcharge will be|Y
01|235858|3|4|disclosed prior to acceptance of an order.|Y
01|235859|5|1|A tariff surcharge may be added to this quotation in|Y
01|235859|5|2|the event of a sustained tariff increase on the|Y
01|235859|5|3|importation of this product.  Any surcharge will be|Y
01|235859|5|4|disclosed prior to acceptance of an order.|Y
01|235860|2|1|A tariff surcharge may be added to this quotation in|Y
01|235860|2|2|the event of a sustained tariff increase on the|Y
01|235860|2|3|importation of this product.  Any surcharge will be|Y
01|235860|2|4|disclosed prior to acceptance of an order.|Y
01|235861|8|1|A tariff surcharge may be added to this quotation in|Y
01|235861|8|2|the event of a sustained tariff increase on the|Y
01|235861|8|3|importation of this product.  Any surcharge will be|Y
01|235861|8|4|disclosed prior to acceptance of an order.|Y
01|235862|14|1|A tariff surcharge may be added to this quotation in|Y
01|235862|14|2|the event of a sustained tariff increase on the|Y
01|235862|14|3|importation of this product.  Any surcharge will be|Y
01|235862|14|4|disclosed prior to acceptance of an order.|Y
01|235863|4|1|A tariff surcharge may be added to this quotation in|Y
01|235863|4|2|the event of a sustained tariff increase on the|Y
01|235863|4|3|importation of this product.  Any surcharge will be|Y
01|235863|4|4|disclosed prior to acceptance of an order.|Y
01|235864|3|1|A tariff surcharge may be added to this quotation in|Y
01|235864|3|2|the event of a sustained tariff increase on the|Y
01|235864|3|3|importation of this product.  Any surcharge will be|Y
01|235864|3|4|disclosed prior to acceptance of an order.|Y
01|235865|2|1|A tariff surcharge may be added to this quotation in|Y
01|235865|2|2|the event of a sustained tariff increase on the|Y
01|235865|2|3|importation of this product.  Any surcharge will be|Y
01|235865|2|4|disclosed prior to acceptance of an order.|Y
01|235866|1|1|ST10-SF10-6.00|Y
01|235866|1|2|1 Straight Shank Extension Shrink Fit Holder 10mm|Y
01|235866|1|3|6 gage length|Y
01|235866|1|4|*Lead time given as ADA - After Signed Drawing Approval|Y
01|235866|1|5|Please allow 1-2 weeks for procurement of approval dwg.|Y
01|235866|1|6|**Quoted at NET price. Minimum order quantity of 5 pcs.|Y
01|235866|2|1|A tariff surcharge may be added to this quotation in|Y
01|235866|2|2|the event of a sustained tariff increase on the|Y
01|235866|2|3|importation of this product.  Any surcharge will be|Y
01|235866|2|4|disclosed prior to acceptance of an order.|Y
01|235867|31|1|PRICE MATCHED TO PNA|N
01|235867|35|1|A tariff surcharge may be added to this quotation in|Y
01|235867|35|2|the event of a sustained tariff increase on the|Y
01|235867|35|3|importation of this product.  Any surcharge will be|Y
01|235867|35|4|disclosed prior to acceptance of an order.|Y
01|235868|2|1|A tariff surcharge may be added to this quotation in|Y
01|235868|2|2|the event of a sustained tariff increase on the|Y
01|235868|2|3|importation of this product.  Any surcharge will be|Y
01|235868|2|4|disclosed prior to acceptance of an order.|Y
01|235869|2|1|A tariff surcharge may be added to this quotation in|Y
01|235869|2|2|the event of a sustained tariff increase on the|Y
01|235869|2|3|importation of this product.  Any surcharge will be|Y
01|235869|2|4|disclosed prior to acceptance of an order.|Y
01|235870|2|1|A tariff surcharge may be added to this quotation in|Y
01|235870|2|2|the event of a sustained tariff increase on the|Y
01|235870|2|3|importation of this product.  Any surcharge will be|Y
01|235870|2|4|disclosed prior to acceptance of an order.|Y
01|235871|4|1|A tariff surcharge may be added to this quotation in|Y
01|235871|4|2|the event of a sustained tariff increase on the|Y
01|235871|4|3|importation of this product.  Any surcharge will be|Y
01|235871|4|4|disclosed prior to acceptance of an order.|Y
01|235872|2|1|A tariff surcharge may be added to this quotation in|Y
01|235872|2|2|the event of a sustained tariff increase on the|Y
01|235872|2|3|importation of this product.  Any surcharge will be|Y
01|235872|2|4|disclosed prior to acceptance of an order.|Y
01|235873|4|1|A tariff surcharge may be added to this quotation in|Y
01|235873|4|2|the event of a sustained tariff increase on the|Y
01|235873|4|3|importation of this product.  Any surcharge will be|Y
01|235873|4|4|disclosed prior to acceptance of an order.|Y
01|235874|2|1|A tariff surcharge may be added to this quotation in|Y
01|235874|2|2|the event of a sustained tariff increase on the|Y
01|235874|2|3|importation of this product.  Any surcharge will be|Y
01|235874|2|4|disclosed prior to acceptance of an order.|Y
01|235875|19|1|A tariff surcharge may be added to this quotation in|Y
01|235875|19|2|the event of a sustained tariff increase on the|Y
01|235875|19|3|importation of this product.  Any surcharge will be|Y
01|235875|19|4|disclosed prior to acceptance of an order.|Y
01|235876|11|1|A tariff surcharge of 8% will be added to every order|Y
01|235876|11|2|placed after September 1st 2025(until further notice).|Y
01|235876|11|3|This surcharge will be acknowledged upon acceptance|Y
01|235876|11|4|of every order.|Y
01|235877|31|1|PRICE MATCHED TO PNA|N
01|235877|35|1|A tariff surcharge may be added to this quotation in|Y
01|235877|35|2|the event of a sustained tariff increase on the|Y
01|235877|35|3|importation of this product.  Any surcharge will be|Y
01|235877|35|4|disclosed prior to acceptance of an order.|Y
01|235878|1|1|match with SN#30337TC|Y
01|235878|1|2|includes the following accessories|Y
01|235878|1|3|TCD-A3022 (8PRJ)|Y
01|235878|1|4|TCE-A7026 (power signal cable)|Y
01|235878|1|5|TCE-94808 (feed back cable)|Y
01|235878|3|1|A tariff surcharge may be added to this quotation in|Y
01|235878|3|2|the event of a sustained tariff increase on the|Y
01|235878|3|3|importation of this product.  Any surcharge will be|Y
01|235878|3|4|disclosed prior to acceptance of an order.|Y
01|235879|5|1|A tariff surcharge may be added to this quotation in|Y
01|235879|5|2|the event of a sustained tariff increase on the|Y
01|235879|5|3|importation of this product.  Any surcharge will be|Y
01|235879|5|4|disclosed prior to acceptance of an order.|Y
01|235880|60|1|A tariff surcharge may be added to this quotation in|Y
01|235880|60|2|the event of a sustained tariff increase on the|Y
01|235880|60|3|importation of this product.  Any surcharge will be|Y
01|235880|60|4|disclosed prior to acceptance of an order.|Y
01|235881|2|1|A tariff surcharge may be added to this quotation in|Y
01|235881|2|2|the event of a sustained tariff increase on the|Y
01|235881|2|3|importation of this product.  Any surcharge will be|Y
01|235881|2|4|disclosed prior to acceptance of an order.|Y
01|235882|2|1|A tariff surcharge may be added to this quotation in|Y
01|235882|2|2|the event of a sustained tariff increase on the|Y
01|235882|2|3|importation of this product.  Any surcharge will be|Y
01|235882|2|4|disclosed prior to acceptance of an order.|Y
01|235883|2|1|A tariff surcharge may be added to this quotation in|Y
01|235883|2|2|the event of a sustained tariff increase on the|Y
01|235883|2|3|importation of this product.  Any surcharge will be|Y
01|235883|2|4|disclosed prior to acceptance of an order.|Y
01|235884|2|1|A tariff surcharge may be added to this quotation in|Y
01|235884|2|2|the event of a sustained tariff increase on the|Y
01|235884|2|3|importation of this product.  Any surcharge will be|Y
01|235884|2|4|disclosed prior to acceptance of an order.|Y
01|235885|1|1|CAT40 SPINDLE TAPER (PAGE 6 CATALOG)|Y
01|235885|2|1|CAT50 SPINDLE TAPER (PAGE 6 CATALOG)|Y
01|235885|3|1|ER16 DUAL OUTPUT RAH ATTACHMENT (PAGE 23 CATALOG)|Y
01|235885|4|1|ER25 DUAL OUTPUT RAH ATTACHMENT (PAGE 24 CATALOG)|Y
01|235885|5|1|POSITIONING PIN ASSEMBLY CAT40 (PAGE 6 CATALOG)|Y
01|235885|6|1|POSITIONING PIN ASSEMBLY CAT50 (PAGE 6 CATALOG)|Y
01|235885|7|1|CUSTOM POSITIONING (ANTI-ROTATION) BLOCK FOR RAH|Y
01|235886|3|1|Lead time is 3~5 days after design confirmation.|Y
01|235886|6|1|A tariff surcharge may be added to this quotation in|Y
01|235886|6|2|the event of a sustained tariff increase on the|Y
01|235886|6|3|importation of this product.  Any surcharge will be|Y
01|235886|6|4|disclosed prior to acceptance of an order.|Y
01|235887|4|1|A tariff surcharge may be added to this quotation in|Y
01|235887|4|2|the event of a sustained tariff increase on the|Y
01|235887|4|3|importation of this product.  Any surcharge will be|Y
01|235887|4|4|disclosed prior to acceptance of an order.|Y
01|235888|3|1|A tariff surcharge may be added to this quotation in|Y
01|235888|3|2|the event of a sustained tariff increase on the|Y
01|235888|3|3|importation of this product.  Any surcharge will be|Y
01|235888|3|4|disclosed prior to acceptance of an order.|Y
01|235889|9|1|A tariff surcharge may be added to this quotation in|Y
01|235889|9|2|the event of a sustained tariff increase on the|Y
01|235889|9|3|importation of this product.  Any surcharge will be|Y
01|235889|9|4|disclosed prior to acceptance of an order.|Y
01|235890|7|1|A tariff surcharge may be added to this quotation in|Y
01|235890|7|2|the event of a sustained tariff increase on the|Y
01|235890|7|3|importation of this product.  Any surcharge will be|Y
01|235890|7|4|disclosed prior to acceptance of an order.|Y
01|235891|1|1|CAT40 ER25 TWIN SPINDLE RIGHT ANGLE HEAD|Y
01|235891|5|1|CUSTOM POSITIONING (ANTI-ROTATION) BLOCK FOR RAH|Y
01|235891|6|1|A tariff surcharge may be added to this quotation in|Y
01|235891|6|2|the event of a sustained tariff increase on the|Y
01|235891|6|3|importation of this product.  Any surcharge will be|Y
01|235891|6|4|disclosed prior to acceptance of an order.|Y
01|235892|1|1|RGA#TAR-62004|Y
01|235892|1|2|5AX-130FA-M SN: XXXXX|Y
01|235892|44|1|A tariff surcharge may be added to this quotation in|Y
01|235892|44|2|the event of a sustained tariff increase on the|Y
01|235892|44|3|importation of this product.  Any surcharge will be|Y
01|235892|44|4|disclosed prior to acceptance of an order.|Y
01|235893|1|1|NBT30-SK10C-90-RPNJ|Y
01|235893|1|2|NBT30 DualContact Slim Chuck SK10 15K Nano Coolant|Y
01|235893|8|1|A tariff surcharge may be added to this quotation in|Y
01|235893|8|2|the event of a sustained tariff increase on the|Y
01|235893|8|3|importation of this product.  Any surcharge will be|Y
01|235893|8|4|disclosed prior to acceptance of an order.|Y
01|235894|8|1|A tariff surcharge may be added to this quotation in|Y
01|235894|8|2|the event of a sustained tariff increase on the|Y
01|235894|8|3|importation of this product.  Any surcharge will be|Y
01|235894|8|4|disclosed prior to acceptance of an order.|Y
01|235895|5|1|A tariff surcharge may be added to this quotation in|Y
01|235895|5|2|the event of a sustained tariff increase on the|Y
01|235895|5|3|importation of this product.  Any surcharge will be|Y
01|235895|5|4|disclosed prior to acceptance of an order.|Y
01|235897|2|1|A tariff surcharge may be added to this quotation in|Y
01|235897|2|2|the event of a sustained tariff increase on the|Y
01|235897|2|3|importation of this product.  Any surcharge will be|Y
01|235897|2|4|disclosed prior to acceptance of an order.|Y
01|235898|3|1|A tariff surcharge may be added to this quotation in|Y
01|235898|3|2|the event of a sustained tariff increase on the|Y
01|235898|3|3|importation of this product.  Any surcharge will be|Y
01|235898|3|4|disclosed prior to acceptance of an order.|Y
01|235899|6|1|A tariff surcharge may be added to this quotation in|Y
01|235899|6|2|the event of a sustained tariff increase on the|Y
01|235899|6|3|importation of this product.  Any surcharge will be|Y
01|235899|6|4|disclosed prior to acceptance of an order.|Y
01|235900|3|1|Existing machine must be capable of accepting 4th axis.|Y
01|235900|4|1|A tariff surcharge may be added to this quotation in|Y
01|235900|4|2|the event of a sustained tariff increase on the|Y
01|235900|4|3|importation of this product.  Any surcharge will be|Y
01|235900|4|4|disclosed prior to acceptance of an order.|Y
01|235901|2|1|A tariff surcharge may be added to this quotation in|Y
01|235901|2|2|the event of a sustained tariff increase on the|Y
01|235901|2|3|importation of this product.  Any surcharge will be|Y
01|235901|2|4|disclosed prior to acceptance of an order.|Y
01|235902|3|1|A tariff surcharge of 8% will be added to every order|Y
01|235902|3|2|placed after September 1st 2025(until further notice).|Y
01|235902|3|3|This surcharge will be acknowledged upon acceptance|Y
01|235902|3|4|of every order.|Y
01|235903|21|1|Please note additional 20% applied per overstock promo.|Y
01|235903|21|2|There are only 5 pieces left in case they want to take|Y
01|235903|21|3|advantage of additional stock/backups. Upon stock|Y
01|235903|21|4|depletion these will need to be requoted for price &|Y
01|235903|21|5|availability. Once PO/order issued these cannot be|Y
01|235903|21|6|cancelled or returned.|Y
01|235903|45|1|A tariff surcharge may be added to this quotation in|Y
01|235903|45|2|the event of a sustained tariff increase on the|Y
01|235903|45|3|importation of this product.  Any surcharge will be|Y
01|235903|45|4|disclosed prior to acceptance of an order.|Y
01|235904|3|1|A tariff surcharge of 8% will be added to every order|Y
01|235904|3|2|placed after September 1st 2025(until further notice).|Y
01|235904|3|3|This surcharge will be acknowledged upon acceptance|Y
01|235904|3|4|of every order.|Y
01|235905|2|1|A tariff surcharge may be added to this quotation in|Y
01|235905|2|2|the event of a sustained tariff increase on the|Y
01|235905|2|3|importation of this product.  Any surcharge will be|Y
01|235905|2|4|disclosed prior to acceptance of an order.|Y
01|235906|2|1|A tariff surcharge may be added to this quotation in|Y
01|235906|2|2|the event of a sustained tariff increase on the|Y
01|235906|2|3|importation of this product.  Any surcharge will be|Y
01|235906|2|4|disclosed prior to acceptance of an order.|Y
01|235907|3|1|This collet is non standard stock. Once a purchase|Y
01|235907|3|2|order is placed it cannot be cancelled or returned.|Y
01|235907|4|1|A tariff surcharge of 8% will be added to every order|Y
01|235907|4|2|placed after September 1st 2025(until further notice).|Y
01|235907|4|3|This surcharge will be acknowledged upon acceptance|Y
01|235907|4|4|of every order.|Y
01|235908|4|1|A tariff surcharge may be added to this quotation in|Y
01|235908|4|2|the event of a sustained tariff increase on the|Y
01|235908|4|3|importation of this product.  Any surcharge will be|Y
01|235908|4|4|disclosed prior to acceptance of an order.|Y
01|235909|2|1|A tariff surcharge may be added to this quotation in|Y
01|235909|2|2|the event of a sustained tariff increase on the|Y
01|235909|2|3|importation of this product.  Any surcharge will be|Y
01|235909|2|4|disclosed prior to acceptance of an order.|Y
01|235910|2|1|Min Order = 2 pieces.|Y
01|235910|3|1|A tariff surcharge may be added to this quotation in|Y
01|235910|3|2|the event of a sustained tariff increase on the|Y
01|235910|3|3|importation of this product.  Any surcharge will be|Y
01|235910|3|4|disclosed prior to acceptance of an order.|Y
01|235911|6|1|A tariff surcharge may be added to this quotation in|Y
01|235911|6|2|the event of a sustained tariff increase on the|Y
01|235911|6|3|importation of this product.  Any surcharge will be|Y
01|235911|6|4|disclosed prior to acceptance of an order.|Y
01|235912|12|1|A tariff surcharge may be added to this quotation in|Y
01|235912|12|2|the event of a sustained tariff increase on the|Y
01|235912|12|3|importation of this product.  Any surcharge will be|Y
01|235912|12|4|disclosed prior to acceptance of an order.|Y
01|235913|2|1|A tariff surcharge may be added to this quotation in|Y
01|235913|2|2|the event of a sustained tariff increase on the|Y
01|235913|2|3|importation of this product.  Any surcharge will be|Y
01|235913|2|4|disclosed prior to acceptance of an order.|Y
01|235914|2|1|A tariff surcharge may be added to this quotation in|Y
01|235914|2|2|the event of a sustained tariff increase on the|Y
01|235914|2|3|importation of this product.  Any surcharge will be|Y
01|235914|2|4|disclosed prior to acceptance of an order.|Y
01|235915|2|1|A tariff surcharge may be added to this quotation in|Y
01|235915|2|2|the event of a sustained tariff increase on the|Y
01|235915|2|3|importation of this product.  Any surcharge will be|Y
01|235915|2|4|disclosed prior to acceptance of an order.|Y
01|235916|4|1|A tariff surcharge may be added to this quotation in|Y
01|235916|4|2|the event of a sustained tariff increase on the|Y
01|235916|4|3|importation of this product.  Any surcharge will be|Y
01|235916|4|4|disclosed prior to acceptance of an order.|Y
01|235917|2|1|A tariff surcharge may be added to this quotation in|Y
01|235917|2|2|the event of a sustained tariff increase on the|Y
01|235917|2|3|importation of this product.  Any surcharge will be|Y
01|235917|2|4|disclosed prior to acceptance of an order.|Y
01|235918|1|1|Pias de Origen: Taiwan|Y
01|235918|2|1|A tariff surcharge may be added to this quotation in|Y
01|235918|2|2|the event of a sustained tariff increase on the|Y
01|235918|2|3|importation of this product.  Any surcharge will be|Y
01|235918|2|4|disclosed prior to acceptance of an order.|Y
01|235919|3|1|A tariff surcharge may be added to this quotation in|Y
01|235919|3|2|the event of a sustained tariff increase on the|Y
01|235919|3|3|importation of this product.  Any surcharge will be|Y
01|235919|3|4|disclosed prior to acceptance of an order.|Y
01|235920|6|1|A tariff surcharge may be added to this quotation in|Y
01|235920|6|2|the event of a sustained tariff increase on the|Y
01|235920|6|3|importation of this product.  Any surcharge will be|Y
01|235920|6|4|disclosed prior to acceptance of an order.|Y
01|235921|6|1|A tariff surcharge may be added to this quotation in|Y
01|235921|6|2|the event of a sustained tariff increase on the|Y
01|235921|6|3|importation of this product.  Any surcharge will be|Y
01|235921|6|4|disclosed prior to acceptance of an order.|Y
01|235922|2|1|A tariff surcharge may be added to this quotation in|Y
01|235922|2|2|the event of a sustained tariff increase on the|Y
01|235922|2|3|importation of this product.  Any surcharge will be|Y
01|235922|2|4|disclosed prior to acceptance of an order.|Y
01|235923|3|1|A tariff surcharge may be added to this quotation in|Y
01|235923|3|2|the event of a sustained tariff increase on the|Y
01|235923|3|3|importation of this product.  Any surcharge will be|Y
01|235923|3|4|disclosed prior to acceptance of an order.|Y
01|235924|8|1|A tariff surcharge may be added to this quotation in|Y
01|235924|8|2|the event of a sustained tariff increase on the|Y
01|235924|8|3|importation of this product.  Any surcharge will be|Y
01|235924|8|4|disclosed prior to acceptance of an order.|Y
01|235925|3|1|A tariff surcharge may be added to this quotation in|Y
01|235925|3|2|the event of a sustained tariff increase on the|Y
01|235925|3|3|importation of this product.  Any surcharge will be|Y
01|235925|3|4|disclosed prior to acceptance of an order.|Y
01|235926|2|1|A tariff surcharge may be added to this quotation in|Y
01|235926|2|2|the event of a sustained tariff increase on the|Y
01|235926|2|3|importation of this product.  Any surcharge will be|Y
01|235926|2|4|disclosed prior to acceptance of an order.|Y
01|235927|2|1|A tariff surcharge may be added to this quotation in|Y
01|235927|2|2|the event of a sustained tariff increase on the|Y
01|235927|2|3|importation of this product.  Any surcharge will be|Y
01|235927|2|4|disclosed prior to acceptance of an order.|Y
01|235928|2|1|A tariff surcharge may be added to this quotation in|Y
01|235928|2|2|the event of a sustained tariff increase on the|Y
01|235928|2|3|importation of this product.  Any surcharge will be|Y
01|235928|2|4|disclosed prior to acceptance of an order.|Y
01|235929|5|1|A tariff surcharge may be added to this quotation in|Y
01|235929|5|2|the event of a sustained tariff increase on the|Y
01|235929|5|3|importation of this product.  Any surcharge will be|Y
01|235929|5|4|disclosed prior to acceptance of an order.|Y
01|235930|2|1|A tariff surcharge may be added to this quotation in|Y
01|235930|2|2|the event of a sustained tariff increase on the|Y
01|235930|2|3|importation of this product.  Any surcharge will be|Y
01|235930|2|4|disclosed prior to acceptance of an order.|Y
01|235931|2|1|A tariff surcharge may be added to this quotation in|Y
01|235931|2|2|the event of a sustained tariff increase on the|Y
01|235931|2|3|importation of this product.  Any surcharge will be|Y
01|235931|2|4|disclosed prior to acceptance of an order.|Y
01|235932|3|1|A tariff surcharge may be added to this quotation in|Y
01|235932|3|2|the event of a sustained tariff increase on the|Y
01|235932|3|3|importation of this product.  Any surcharge will be|Y
01|235932|3|4|disclosed prior to acceptance of an order.|Y
01|235933|7|1|A tariff surcharge may be added to this quotation in|Y
01|235933|7|2|the event of a sustained tariff increase on the|Y
01|235933|7|3|importation of this product.  Any surcharge will be|Y
01|235933|7|4|disclosed prior to acceptance of an order.|Y
01|235934|2|1|A tariff surcharge may be added to this quotation in|Y
01|235934|2|2|the event of a sustained tariff increase on the|Y
01|235934|2|3|importation of this product.  Any surcharge will be|Y
01|235934|2|4|disclosed prior to acceptance of an order.|Y
01|235935|2|1|A tariff surcharge may be added to this quotation in|Y
01|235935|2|2|the event of a sustained tariff increase on the|Y
01|235935|2|3|importation of this product.  Any surcharge will be|Y
01|235935|2|4|disclosed prior to acceptance of an order.|Y
01|235936|2|1|A tariff surcharge may be added to this quotation in|Y
01|235936|2|2|the event of a sustained tariff increase on the|Y
01|235936|2|3|importation of this product.  Any surcharge will be|Y
01|235936|2|4|disclosed prior to acceptance of an order.|Y
01|235937|2|1|A tariff surcharge may be added to this quotation in|Y
01|235937|2|2|the event of a sustained tariff increase on the|Y
01|235937|2|3|importation of this product.  Any surcharge will be|Y
01|235937|2|4|disclosed prior to acceptance of an order.|Y
01|235938|5|1|A tariff surcharge may be added to this quotation in|Y
01|235938|5|2|the event of a sustained tariff increase on the|Y
01|235938|5|3|importation of this product.  Any surcharge will be|Y
01|235938|5|4|disclosed prior to acceptance of an order.|Y
01|235939|23|1|A tariff surcharge of 8% will be added to every order|Y
01|235939|23|2|placed after September 1st 2025(until further notice).|Y
01|235939|23|3|This surcharge will be acknowledged upon acceptance|Y
01|235939|23|4|of every order.|Y
01|235940|8|1|A tariff surcharge may be added to this quotation in|Y
01|235940|8|2|the event of a sustained tariff increase on the|Y
01|235940|8|3|importation of this product.  Any surcharge will be|Y
01|235940|8|4|disclosed prior to acceptance of an order.|Y
01|235941|4|1|A tariff surcharge may be added to this quotation in|Y
01|235941|4|2|the event of a sustained tariff increase on the|Y
01|235941|4|3|importation of this product.  Any surcharge will be|Y
01|235941|4|4|disclosed prior to acceptance of an order.|Y
01|235942|2|1|A tariff surcharge may be added to this quotation in|Y
01|235942|2|2|the event of a sustained tariff increase on the|Y
01|235942|2|3|importation of this product.  Any surcharge will be|Y
01|235942|2|4|disclosed prior to acceptance of an order.|Y
01|235943|2|1|A tariff surcharge may be added to this quotation in|Y
01|235943|2|2|the event of a sustained tariff increase on the|Y
01|235943|2|3|importation of this product.  Any surcharge will be|Y
01|235943|2|4|disclosed prior to acceptance of an order.|Y
01|235944|2|1|A tariff surcharge may be added to this quotation in|Y
01|235944|2|2|the event of a sustained tariff increase on the|Y
01|235944|2|3|importation of this product.  Any surcharge will be|Y
01|235944|2|4|disclosed prior to acceptance of an order.|Y
01|235945|4|1|A tariff surcharge may be added to this quotation in|Y
01|235945|4|2|the event of a sustained tariff increase on the|Y
01|235945|4|3|importation of this product.  Any surcharge will be|Y
01|235945|4|4|disclosed prior to acceptance of an order.|Y
01|235946|2|1|Core buy back promotion|Y
01|235946|3|1|A tariff surcharge may be added to this quotation in|Y
01|235946|3|2|the event of a sustained tariff increase on the|Y
01|235946|3|3|importation of this product.  Any surcharge will be|Y
01|235946|3|4|disclosed prior to acceptance of an order.|Y
01|235948|2|1|A tariff surcharge may be added to this quotation in|Y
01|235948|2|2|the event of a sustained tariff increase on the|Y
01|235948|2|3|importation of this product.  Any surcharge will be|Y
01|235948|2|4|disclosed prior to acceptance of an order.|Y
01|235949|2|1|A tariff surcharge may be added to this quotation in|Y
01|235949|2|2|the event of a sustained tariff increase on the|Y
01|235949|2|3|importation of this product.  Any surcharge will be|Y
01|235949|2|4|disclosed prior to acceptance of an order.|Y
01|235950|1|1|Need to verify motor model and size|Y
01|235950|3|1|A tariff surcharge may be added to this quotation in|Y
01|235950|3|2|the event of a sustained tariff increase on the|Y
01|235950|3|3|importation of this product.  Any surcharge will be|Y
01|235950|3|4|disclosed prior to acceptance of an order.|Y
01|235951|2|1|A tariff surcharge may be added to this quotation in|Y
01|235951|2|2|the event of a sustained tariff increase on the|Y
01|235951|2|3|importation of this product.  Any surcharge will be|Y
01|235951|2|4|disclosed prior to acceptance of an order.|Y
01|235952|2|1|A tariff surcharge may be added to this quotation in|Y
01|235952|2|2|the event of a sustained tariff increase on the|Y
01|235952|2|3|importation of this product.  Any surcharge will be|Y
01|235952|2|4|disclosed prior to acceptance of an order.|Y
01|235953|4|1|A tariff surcharge may be added to this quotation in|Y
01|235953|4|2|the event of a sustained tariff increase on the|Y
01|235953|4|3|importation of this product.  Any surcharge will be|Y
01|235953|4|4|disclosed prior to acceptance of an order.|Y
01|235954|2|1|A tariff surcharge may be added to this quotation in|Y
01|235954|2|2|the event of a sustained tariff increase on the|Y
01|235954|2|3|importation of this product.  Any surcharge will be|Y
01|235954|2|4|disclosed prior to acceptance of an order.|Y
01|235956|4|1|A tariff surcharge may be added to this quotation in|Y
01|235956|4|2|the event of a sustained tariff increase on the|Y
01|235956|4|3|importation of this product.  Any surcharge will be|Y
01|235956|4|4|disclosed prior to acceptance of an order.|Y
01|235957|7|1|A tariff surcharge may be added to this quotation in|Y
01|235957|7|2|the event of a sustained tariff increase on the|Y
01|235957|7|3|importation of this product.  Any surcharge will be|Y
01|235957|7|4|disclosed prior to acceptance of an order.|Y
01|235958|4|1|A tariff surcharge may be added to this quotation in|Y
01|235958|4|2|the event of a sustained tariff increase on the|Y
01|235958|4|3|importation of this product.  Any surcharge will be|Y
01|235958|4|4|disclosed prior to acceptance of an order.|Y
01|235959|2|1|A tariff surcharge may be added to this quotation in|Y
01|235959|2|2|the event of a sustained tariff increase on the|Y
01|235959|2|3|importation of this product.  Any surcharge will be|Y
01|235959|2|4|disclosed prior to acceptance of an order.|Y
01|235960|2|1|A tariff surcharge may be added to this quotation in|Y
01|235960|2|2|the event of a sustained tariff increase on the|Y
01|235960|2|3|importation of this product.  Any surcharge will be|Y
01|235960|2|4|disclosed prior to acceptance of an order.|Y
01|235961|2|1|A tariff surcharge may be added to this quotation in|Y
01|235961|2|2|the event of a sustained tariff increase on the|Y
01|235961|2|3|importation of this product.  Any surcharge will be|Y
01|235961|2|4|disclosed prior to acceptance of an order.|Y
01|235962|3|1|A tariff surcharge may be added to this quotation in|Y
01|235962|3|2|the event of a sustained tariff increase on the|Y
01|235962|3|3|importation of this product.  Any surcharge will be|Y
01|235962|3|4|disclosed prior to acceptance of an order.|Y
01|235963|19|1|A tariff surcharge of 8% will be added to every order|Y
01|235963|19|2|placed after September 1st 2025(until further notice).|Y
01|235963|19|3|This surcharge will be acknowledged upon acceptance|Y
01|235963|19|4|of every order.|Y
01|235964|14|1|A tariff surcharge may be added to this quotation in|Y
01|235964|14|2|the event of a sustained tariff increase on the|Y
01|235964|14|3|importation of this product.  Any surcharge will be|Y
01|235964|14|4|disclosed prior to acceptance of an order.|Y
01|235965|2|1|A tariff surcharge may be added to this quotation in|Y
01|235965|2|2|the event of a sustained tariff increase on the|Y
01|235965|2|3|importation of this product.  Any surcharge will be|Y
01|235965|2|4|disclosed prior to acceptance of an order.|Y
01|235966|2|1|A tariff surcharge may be added to this quotation in|Y
01|235966|2|2|the event of a sustained tariff increase on the|Y
01|235966|2|3|importation of this product.  Any surcharge will be|Y
01|235966|2|4|disclosed prior to acceptance of an order.|Y
01|235967|2|1|A tariff surcharge may be added to this quotation in|Y
01|235967|2|2|the event of a sustained tariff increase on the|Y
01|235967|2|3|importation of this product.  Any surcharge will be|Y
01|235967|2|4|disclosed prior to acceptance of an order.|Y
01|235968|2|1|A tariff surcharge may be added to this quotation in|Y
01|235968|2|2|the event of a sustained tariff increase on the|Y
01|235968|2|3|importation of this product.  Any surcharge will be|Y
01|235968|2|4|disclosed prior to acceptance of an order.|Y
01|235969|1|1|RGA#TAR-62138|Y
01|235969|1|2|CNCB450FA SN:1061|Y
01|235969|19|1|A tariff surcharge may be added to this quotation in|Y
01|235969|19|2|the event of a sustained tariff increase on the|Y
01|235969|19|3|importation of this product.  Any surcharge will be|Y
01|235969|19|4|disclosed prior to acceptance of an order.|Y
01|235970|3|1|A tariff surcharge may be added to this quotation in|Y
01|235970|3|2|the event of a sustained tariff increase on the|Y
01|235970|3|3|importation of this product.  Any surcharge will be|Y
01|235970|3|4|disclosed prior to acceptance of an order.|Y
01|235971|2|1|A tariff surcharge may be added to this quotation in|Y
01|235971|2|2|the event of a sustained tariff increase on the|Y
01|235971|2|3|importation of this product.  Any surcharge will be|Y
01|235971|2|4|disclosed prior to acceptance of an order.|Y
01|235972|4|1|A tariff surcharge may be added to this quotation in|Y
01|235972|4|2|the event of a sustained tariff increase on the|Y
01|235972|4|3|importation of this product.  Any surcharge will be|Y
01|235972|4|4|disclosed prior to acceptance of an order.|Y
01|235973|2|1|A tariff surcharge may be added to this quotation in|Y
01|235973|2|2|the event of a sustained tariff increase on the|Y
01|235973|2|3|importation of this product.  Any surcharge will be|Y
01|235973|2|4|disclosed prior to acceptance of an order.|Y
01|235974|2|1|A tariff surcharge may be added to this quotation in|Y
01|235974|2|2|the event of a sustained tariff increase on the|Y
01|235974|2|3|importation of this product.  Any surcharge will be|Y
01|235974|2|4|disclosed prior to acceptance of an order.|Y
01|235975|3|1|A tariff surcharge may be added to this quotation in|Y
01|235975|3|2|the event of a sustained tariff increase on the|Y
01|235975|3|3|importation of this product.  Any surcharge will be|Y
01|235975|3|4|disclosed prior to acceptance of an order.|Y
01|235976|2|1|A tariff surcharge may be added to this quotation in|Y
01|235976|2|2|the event of a sustained tariff increase on the|Y
01|235976|2|3|importation of this product.  Any surcharge will be|Y
01|235976|2|4|disclosed prior to acceptance of an order.|Y
01|235977|2|1|A tariff surcharge may be added to this quotation in|Y
01|235977|2|2|the event of a sustained tariff increase on the|Y
01|235977|2|3|importation of this product.  Any surcharge will be|Y
01|235977|2|4|disclosed prior to acceptance of an order.|Y
01|235978|2|1|Quoted at NET price.|Y
01|235978|3|1|A tariff surcharge may be added to this quotation in|Y
01|235978|3|2|the event of a sustained tariff increase on the|Y
01|235978|3|3|importation of this product.  Any surcharge will be|Y
01|235978|3|4|disclosed prior to acceptance of an order.|Y
01|235979|1|1|Currently 12 in stock as of today.  Estimated lead time|Y
01|235979|1|2|for remaining holders is early October after receipt|Y
01|235979|1|3|of an order.|Y
01|235979|11|1|Currently there are two (2) in stock.  Estimated lead|Y
01|235979|11|2|time for balance of four (4) is 8~10 weeks after|Y
01|235979|11|3|receipt of an order.|Y
01|235979|12|1|Estimated lead time is end of August/beginning of|Y
01|235979|12|2|September.|Y
01|235979|16|1|A tariff surcharge may be added to this quotation in|Y
01|235979|16|2|the event of a sustained tariff increase on the|Y
01|235979|16|3|importation of this product.  Any surcharge will be|Y
01|235979|16|4|disclosed prior to acceptance of an order.|Y
01|235980|3|1|A tariff surcharge may be added to this quotation in|Y
01|235980|3|2|the event of a sustained tariff increase on the|Y
01|235980|3|3|importation of this product.  Any surcharge will be|Y
01|235980|3|4|disclosed prior to acceptance of an order.|Y
01|235981|2|1|A tariff surcharge may be added to this quotation in|Y
01|235981|2|2|the event of a sustained tariff increase on the|Y
01|235981|2|3|importation of this product.  Any surcharge will be|Y
01|235981|2|4|disclosed prior to acceptance of an order.|Y
01|235982|2|1|A tariff surcharge may be added to this quotation in|Y
01|235982|2|2|the event of a sustained tariff increase on the|Y
01|235982|2|3|importation of this product.  Any surcharge will be|Y
01|235982|2|4|disclosed prior to acceptance of an order.|Y
01|235983|4|1|A tariff surcharge may be added to this quotation in|Y
01|235983|4|2|the event of a sustained tariff increase on the|Y
01|235983|4|3|importation of this product.  Any surcharge will be|Y
01|235983|4|4|disclosed prior to acceptance of an order.|Y
01|235984|3|1|A tariff surcharge may be added to this quotation in|Y
01|235984|3|2|the event of a sustained tariff increase on the|Y
01|235984|3|3|importation of this product.  Any surcharge will be|Y
01|235984|3|4|disclosed prior to acceptance of an order.|Y
01|235985|2|1|A tariff surcharge may be added to this quotation in|Y
01|235985|2|2|the event of a sustained tariff increase on the|Y
01|235985|2|3|importation of this product.  Any surcharge will be|Y
01|235985|2|4|disclosed prior to acceptance of an order.|Y
01|235986|2|1|A tariff surcharge may be added to this quotation in|Y
01|235986|2|2|the event of a sustained tariff increase on the|Y
01|235986|2|3|importation of this product.  Any surcharge will be|Y
01|235986|2|4|disclosed prior to acceptance of an order.|Y
01|235987|1|1|No Inspection Required.|Y
01|235987|2|1|No Inspection Required.|Y
01|235987|3|1|No Inspection Required.|Y
01|235987|4|1|No Inspection Required.|Y
01|235987|5|1|No Inspection Required.|Y
01|235987|6|1|No Inspection Required.|Y
01|235987|7|1|No Inspection Required.|Y
01|235987|-13|1|A tariff surcharge may be added to this quotation in|Y
01|235987|-13|2|the event of a sustained tariff increase on the|Y
01|235987|-13|3|importation of this product.  Any surcharge will be|Y
01|235987|-13|4|disclosed prior to acceptance of an order.|Y
01|235988|3|1|A tariff surcharge may be added to this quotation in|Y
01|235988|3|2|the event of a sustained tariff increase on the|Y
01|235988|3|3|importation of this product.  Any surcharge will be|Y
01|235988|3|4|disclosed prior to acceptance of an order.|Y
01|235989|6|1|A tariff surcharge may be added to this quotation in|Y
01|235989|6|2|the event of a sustained tariff increase on the|Y
01|235989|6|3|importation of this product.  Any surcharge will be|Y
01|235989|6|4|disclosed prior to acceptance of an order.|Y
01|235990|2|1|A tariff surcharge may be added to this quotation in|Y
01|235990|2|2|the event of a sustained tariff increase on the|Y
01|235990|2|3|importation of this product.  Any surcharge will be|Y
01|235990|2|4|disclosed prior to acceptance of an order.|Y
01|235991|5|1|A tariff surcharge may be added to this quotation in|Y
01|235991|5|2|the event of a sustained tariff increase on the|Y
01|235991|5|3|importation of this product.  Any surcharge will be|Y
01|235991|5|4|disclosed prior to acceptance of an order.|Y
01|235992|2|1|A tariff surcharge may be added to this quotation in|Y
01|235992|2|2|the event of a sustained tariff increase on the|Y
01|235992|2|3|importation of this product.  Any surcharge will be|Y
01|235992|2|4|disclosed prior to acceptance of an order.|Y
01|235993|2|1|A tariff surcharge may be added to this quotation in|Y
01|235993|2|2|the event of a sustained tariff increase on the|Y
01|235993|2|3|importation of this product.  Any surcharge will be|Y
01|235993|2|4|disclosed prior to acceptance of an order.|Y
01|235994|3|1|A tariff surcharge may be added to this quotation in|Y
01|235994|3|2|the event of a sustained tariff increase on the|Y
01|235994|3|3|importation of this product.  Any surcharge will be|Y
01|235994|3|4|disclosed prior to acceptance of an order.|Y
01|235995|2|1|A tariff surcharge may be added to this quotation in|Y
01|235995|2|2|the event of a sustained tariff increase on the|Y
01|235995|2|3|importation of this product.  Any surcharge will be|Y
01|235995|2|4|disclosed prior to acceptance of an order.|Y
01|235996|2|1|A tariff surcharge may be added to this quotation in|Y
01|235996|2|2|the event of a sustained tariff increase on the|Y
01|235996|2|3|importation of this product.  Any surcharge will be|Y
01|235996|2|4|disclosed prior to acceptance of an order.|Y
01|235997|1|1|Placeholder for special KM1-18.3 collet. Please note|Y
01|235997|1|2|this is considered special and quoted at special net|Y
01|235997|1|3|price. Once PO/order issued these cannot be cancelled|Y
01|235997|1|4|or returned.|Y
01|235997|8|1|Placeholder for special CCK1-18.3 collet. Please note|Y
01|235997|8|2|this is considered special and quoted at special net|Y
01|235997|8|3|price. Once PO/order issued these cannot be cancelled|Y
01|235997|8|4|or returned.|Y
01|235997|19|1|A tariff surcharge of 8% will be added to every order|Y
01|235997|19|2|placed after September 1st 2025(until further notice).|Y
01|235997|19|3|This surcharge will be acknowledged upon acceptance|Y
01|235997|19|4|of every order. to acceptance of an order.|Y
01|235998|4|1|A tariff surcharge may be added to this quotation in|Y
01|235998|4|2|the event of a sustained tariff increase on the|Y
01|235998|4|3|importation of this product.  Any surcharge will be|Y
01|235998|4|4|disclosed prior to acceptance of an order.|Y
01|235999|2|1|A tariff surcharge may be added to this quotation in|Y
01|235999|2|2|the event of a sustained tariff increase on the|Y
01|235999|2|3|importation of this product.  Any surcharge will be|Y
01|235999|2|4|disclosed prior to acceptance of an order.|Y
01|236000|4|1|A tariff surcharge may be added to this quotation in|Y
01|236000|4|2|the event of a sustained tariff increase on the|Y
01|236000|4|3|importation of this product.  Any surcharge will be|Y
01|236000|4|4|disclosed prior to acceptance of an order.|Y
01|236001|2|1|Please note additional 20% applied per overstock promo.|Y
01|236001|2|2|Once PO/order issued these cannot be cancelled or|Y
01|236001|2|3|returned. Upon stock depletion this will need to be|Y
01|236001|2|4|requoted for price & availability.|Y
01|236001|8|1|A tariff surcharge may be added to this quotation in|Y
01|236001|8|2|the event of a sustained tariff increase on the|Y
01|236001|8|3|importation of this product.  Any surcharge will be|Y
01|236001|8|4|disclosed prior to acceptance of an order.|Y
01|236002|5|1|A tariff surcharge may be added to this quotation in|Y
01|236002|5|2|the event of a sustained tariff increase on the|Y
01|236002|5|3|importation of this product.  Any surcharge will be|Y
01|236002|5|4|disclosed prior to acceptance of an order.|Y
01|236003|32|1|NBT30-FMH22-60-45|Y
01|236003|32|2|22MM PILOT; BIG PLUS BT30 SHELL MILL HOLDER|Y
01|236003|32|3|COOLANT PORTS BUILT INTO BODY|Y
01|236003|32|4|WILL MATCH WITH PH HORN CUTTER BODY|Y
01|236004|2|1|A tariff surcharge may be added to this quotation in|Y
01|236004|2|2|the event of a sustained tariff increase on the|Y
01|236004|2|3|importation of this product.  Any surcharge will be|Y
01|236004|2|4|disclosed prior to acceptance of an order.|Y
01|236005|2|1|A tariff surcharge may be added to this quotation in|Y
01|236005|2|2|the event of a sustained tariff increase on the|Y
01|236005|2|3|importation of this product.  Any surcharge will be|Y
01|236005|2|4|disclosed prior to acceptance of an order.|Y
01|236006|6|1|A tariff surcharge may be added to this quotation in|Y
01|236006|6|2|the event of a sustained tariff increase on the|Y
01|236006|6|3|importation of this product.  Any surcharge will be|Y
01|236006|6|4|disclosed prior to acceptance of an order.|Y
01|236007|2|1|A tariff surcharge may be added to this quotation in|Y
01|236007|2|2|the event of a sustained tariff increase on the|Y
01|236007|2|3|importation of this product.  Any surcharge will be|Y
01|236007|2|4|disclosed prior to acceptance of an order.|Y
01|236008|7|1|A tariff surcharge may be added to this quotation in|Y
01|236008|7|2|the event of a sustained tariff increase on the|Y
01|236008|7|3|importation of this product.  Any surcharge will be|Y
01|236008|7|4|disclosed prior to acceptance of an order.|Y
01|236009|3|1|Final Part# SK20-6P|Y
01|236009|5|1|Final Part# Sk20-12P|Y
01|236009|7|1|Final Part# SK20-11P|Y
01|236009|8|1|Final Part# SK20-7P|Y
01|236009|10|1|Final Part# SK20-8P|Y
01|236009|12|1|Final Part# SK20-13P|Y
01|236009|13|1|Final Part# SKJ25-13 **NET PRICE**|Y
01|236009|14|1|Final Part# SK20-9P|Y
01|236009|15|1|Final Part# SKJ25-9 **NET PRICE**|Y
01|236009|19|1|Final Part# SKJ25-14 **NET PRICE**|Y
01|236009|20|1|Final Part# SK20-5P|Y
01|236009|21|1|Final Part# SKJ25-5 **NET PRICE**|Y
01|236009|35|1|Final Part# CCK3/4-5 **NET PRICE**|Y
01|236009|36|1|Final Part# CKFN20(3/4)-5 **NET PRICE**|Y
01|236009|39|1|A tariff surcharge of 8% will be added to every order|Y
01|236009|39|2|placed after September 1st 2025(until further notice).|Y
01|236009|39|3|This surcharge will be acknowledged upon acceptance|Y
01|236009|39|4|of every order.|Y
01|236010|2|1|A tariff surcharge may be added to this quotation in|Y
01|236010|2|2|the event of a sustained tariff increase on the|Y
01|236010|2|3|importation of this product.  Any surcharge will be|Y
01|236010|2|4|disclosed prior to acceptance of an order.|Y
01|236011|2|1|A tariff surcharge may be added to this quotation in|Y
01|236011|2|2|the event of a sustained tariff increase on the|Y
01|236011|2|3|importation of this product.  Any surcharge will be|Y
01|236011|2|4|disclosed prior to acceptance of an order.|Y
01|236012|1|1|Part # TBD >> RMS-9.6-258L-OH +0.04/+0.03|Y
01|236012|1|2|Carbide Radical Mill Reamer / Made with thru hole.|Y
01|236012|1|3|Quoted at Net price for 1~4 reamers.|Y
01|236012|5|1|A tariff surcharge may be added to this quotation in|Y
01|236012|5|2|the event of a sustained tariff increase on the|Y
01|236012|5|3|importation of this product.  Any surcharge will be|Y
01|236012|5|4|disclosed prior to acceptance of an order.|Y
01|236013|2|1|A tariff surcharge may be added to this quotation in|Y
01|236013|2|2|the event of a sustained tariff increase on the|Y
01|236013|2|3|importation of this product.  Any surcharge will be|Y
01|236013|2|4|disclosed prior to acceptance of an order.|Y
01|236014|2|1|A tariff surcharge may be added to this quotation in|Y
01|236014|2|2|the event of a sustained tariff increase on the|Y
01|236014|2|3|importation of this product.  Any surcharge will be|Y
01|236014|2|4|disclosed prior to acceptance of an order.|Y
01|236015|2|1|Please note additional 20% applied per overstock promo.|Y
01|236015|2|2|Once PO/order issued these cannot be cancelled or|Y
01|236015|2|3|returned. Upon stock depletion this will need to be|Y
01|236015|2|4|requoted for price & availability.|Y
01|236015|5|1|A tariff surcharge may be added to this quotation in|Y
01|236015|5|2|the event of a sustained tariff increase on the|Y
01|236015|5|3|importation of this product.  Any surcharge will be|Y
01|236015|5|4|disclosed prior to acceptance of an order.|Y
01|236016|4|1|A tariff surcharge may be added to this quotation in|Y
01|236016|4|2|the event of a sustained tariff increase on the|Y
01|236016|4|3|importation of this product.  Any surcharge will be|Y
01|236016|4|4|disclosed prior to acceptance of an order.|Y
01|236017|3|1|A tariff surcharge may be added to this quotation in|Y
01|236017|3|2|the event of a sustained tariff increase on the|Y
01|236017|3|3|importation of this product.  Any surcharge will be|Y
01|236017|3|4|disclosed prior to acceptance of an order.|Y
01|236018|4|1|A tariff surcharge may be added to this quotation in|Y
01|236018|4|2|the event of a sustained tariff increase on the|Y
01|236018|4|3|importation of this product.  Any surcharge will be|Y
01|236018|4|4|disclosed prior to acceptance of an order.|Y
01|236019|8|1|A tariff surcharge may be added to this quotation in|Y
01|236019|8|2|the event of a sustained tariff increase on the|Y
01|236019|8|3|importation of this product.  Any surcharge will be|Y
01|236019|8|4|disclosed prior to acceptance of an order.|Y
01|236020|2|1|A tariff surcharge may be added to this quotation in|Y
01|236020|2|2|the event of a sustained tariff increase on the|Y
01|236020|2|3|importation of this product.  Any surcharge will be|Y
01|236020|2|4|disclosed prior to acceptance of an order.|Y
01|236021|2|1|A tariff surcharge may be added to this quotation in|Y
01|236021|2|2|the event of a sustained tariff increase on the|Y
01|236021|2|3|importation of this product.  Any surcharge will be|Y
01|236021|2|4|disclosed prior to acceptance of an order.|Y
01|236024|2|1|A tariff surcharge may be added to this quotation in|Y
01|236024|2|2|the event of a sustained tariff increase on the|Y
01|236024|2|3|importation of this product.  Any surcharge will be|Y
01|236024|2|4|disclosed prior to acceptance of an order.|Y
01|236025|2|1|A tariff surcharge may be added to this quotation in|Y
01|236025|2|2|the event of a sustained tariff increase on the|Y
01|236025|2|3|importation of this product.  Any surcharge will be|Y
01|236025|2|4|disclosed prior to acceptance of an order.|Y
01|236026|4|1|A tariff surcharge may be added to this quotation in|Y
01|236026|4|2|the event of a sustained tariff increase on the|Y
01|236026|4|3|importation of this product.  Any surcharge will be|Y
01|236026|4|4|disclosed prior to acceptance of an order.|Y
01|236027|2|1|A tariff surcharge may be added to this quotation in|Y
01|236027|2|2|the event of a sustained tariff increase on the|Y
01|236027|2|3|importation of this product.  Any surcharge will be|Y
01|236027|2|4|disclosed prior to acceptance of an order.|Y
01|236028|3|1|A tariff surcharge may be added to this quotation in|Y
01|236028|3|2|the event of a sustained tariff increase on the|Y
01|236028|3|3|importation of this product.  Any surcharge will be|Y
01|236028|3|4|disclosed prior to acceptance of an order.|Y
01|236029|3|1|A tariff surcharge may be added to this quotation in|Y
01|236029|3|2|the event of a sustained tariff increase on the|Y
01|236029|3|3|importation of this product.  Any surcharge will be|Y
01|236029|3|4|disclosed prior to acceptance of an order.|Y
01|236030|2|1|A tariff surcharge may be added to this quotation in|Y
01|236030|2|2|the event of a sustained tariff increase on the|Y
01|236030|2|3|importation of this product.  Any surcharge will be|Y
01|236030|2|4|disclosed prior to acceptance of an order.|Y
01|236031|2|1|A tariff surcharge may be added to this quotation in|Y
01|236031|2|2|the event of a sustained tariff increase on the|Y
01|236031|2|3|importation of this product.  Any surcharge will be|Y
01|236031|2|4|disclosed prior to acceptance of an order.|Y
01|236032|4|1|A tariff surcharge may be added to this quotation in|Y
01|236032|4|2|the event of a sustained tariff increase on the|Y
01|236032|4|3|importation of this product.  Any surcharge will be|Y
01|236032|4|4|disclosed prior to acceptance of an order.|Y
01|236033|12|1|A tariff surcharge may be added to this quotation in|Y
01|236033|12|2|the event of a sustained tariff increase on the|Y
01|236033|12|3|importation of this product.  Any surcharge will be|Y
01|236033|12|4|disclosed prior to acceptance of an order.|Y
01|236034|4|1|On-site repair time.|Y
01|236034|8|1|$1000/Air & Rental Car|Y
01|236034|8|2|$400/Accomodation|Y
01|236034|8|3|$300/Meal & Incidental|Y
01|236035|2|1|A tariff surcharge may be added to this quotation in|Y
01|236035|2|2|the event of a sustained tariff increase on the|Y
01|236035|2|3|importation of this product.  Any surcharge will be|Y
01|236035|2|4|disclosed prior to acceptance of an order.|Y
01|236036|2|1|A tariff surcharge may be added to this quotation in|Y
01|236036|2|2|the event of a sustained tariff increase on the|Y
01|236036|2|3|importation of this product.  Any surcharge will be|Y
01|236036|2|4|disclosed prior to acceptance of an order.|Y
01|236037|6|1|A tariff surcharge may be added to this quotation in|Y
01|236037|6|2|the event of a sustained tariff increase on the|Y
01|236037|6|3|importation of this product.  Any surcharge will be|Y
01|236037|6|4|disclosed prior to acceptance of an order.|Y
01|236038|5|1|A tariff surcharge may be added to this quotation in|Y
01|236038|5|2|the event of a sustained tariff increase on the|Y
01|236038|5|3|importation of this product.  Any surcharge will be|Y
01|236038|5|4|disclosed prior to acceptance of an order.|Y
01|236039|12|1|A tariff surcharge may be added to this quotation in|Y
01|236039|12|2|the event of a sustained tariff increase on the|Y
01|236039|12|3|importation of this product.  Any surcharge will be|Y
01|236039|12|4|disclosed prior to acceptance of an order.|Y
01|236040|10|1|A tariff surcharge may be added to this quotation in|Y
01|236040|10|2|the event of a sustained tariff increase on the|Y
01|236040|10|3|importation of this product.  Any surcharge will be|Y
01|236040|10|4|disclosed prior to acceptance of an order.|Y
01|236041|2|1|A tariff surcharge may be added to this quotation in|Y
01|236041|2|2|the event of a sustained tariff increase on the|Y
01|236041|2|3|importation of this product.  Any surcharge will be|Y
01|236041|2|4|disclosed prior to acceptance of an order.|Y
01|236042|2|1|A tariff surcharge may be added to this quotation in|Y
01|236042|2|2|the event of a sustained tariff increase on the|Y
01|236042|2|3|importation of this product.  Any surcharge will be|Y
01|236042|2|4|disclosed prior to acceptance of an order.|Y
01|236043|2|1|A tariff surcharge may be added to this quotation in|Y
01|236043|2|2|the event of a sustained tariff increase on the|Y
01|236043|2|3|importation of this product.  Any surcharge will be|Y
01|236043|2|4|disclosed prior to acceptance of an order.|Y
01|236044|5|1|A tariff surcharge may be added to this quotation in|Y
01|236044|5|2|the event of a sustained tariff increase on the|Y
01|236044|5|3|importation of this product.  Any surcharge will be|Y
01|236044|5|4|disclosed prior to acceptance of an order.|Y
01|236045|2|1|A tariff surcharge may be added to this quotation in|Y
01|236045|2|2|the event of a sustained tariff increase on the|Y
01|236045|2|3|importation of this product.  Any surcharge will be|Y
01|236045|2|4|disclosed prior to acceptance of an order.|Y
01|236046|2|1|A tariff surcharge may be added to this quotation in|Y
01|236046|2|2|the event of a sustained tariff increase on the|Y
01|236046|2|3|importation of this product.  Any surcharge will be|Y
01|236046|2|4|disclosed prior to acceptance of an order.|Y
01|236047|2|1|A tariff surcharge may be added to this quotation in|Y
01|236047|2|2|the event of a sustained tariff increase on the|Y
01|236047|2|3|importation of this product.  Any surcharge will be|Y
01|236047|2|4|disclosed prior to acceptance of an order.|Y
01|236048|4|1|A tariff surcharge may be added to this quotation in|Y
01|236048|4|2|the event of a sustained tariff increase on the|Y
01|236048|4|3|importation of this product.  Any surcharge will be|Y
01|236048|4|4|disclosed prior to acceptance of an order.|Y
01|236049|3|1|A tariff surcharge may be added to this quotation in|Y
01|236049|3|2|the event of a sustained tariff increase on the|Y
01|236049|3|3|importation of this product.  Any surcharge will be|Y
01|236049|3|4|disclosed prior to acceptance of an order.|Y
01|236050|2|1|A tariff surcharge may be added to this quotation in|Y
01|236050|2|2|the event of a sustained tariff increase on the|Y
01|236050|2|3|importation of this product.  Any surcharge will be|Y
01|236050|2|4|disclosed prior to acceptance of an order.|Y
01|236051|1|1|Note: Special adapter plate for 10 chuck to CNC321|Y
01|236051|1|2|face plate.|Y
01|236051|1|3|Delivery -6 weeks ARO.|Y
01|236051|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236051|2|2|placed after August 31st 2025(until further notice).|Y
01|236051|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236051|2|4|of every order.|Y
01|236052|3|1|A tariff surcharge may be added to this quotation in|Y
01|236052|3|2|the event of a sustained tariff increase on the|Y
01|236052|3|3|importation of this product.  Any surcharge will be|Y
01|236052|3|4|disclosed prior to acceptance of an order.|Y
01|236053|2|1|A tariff surcharge may be added to this quotation in|Y
01|236053|2|2|the event of a sustained tariff increase on the|Y
01|236053|2|3|importation of this product.  Any surcharge will be|Y
01|236053|2|4|disclosed prior to acceptance of an order.|Y
01|236054|15|1|A tariff surcharge may be added to this quotation in|Y
01|236054|15|2|the event of a sustained tariff increase on the|Y
01|236054|15|3|importation of this product.  Any surcharge will be|Y
01|236054|15|4|disclosed prior to acceptance of an order.|Y
01|236055|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236055|5|2|placed after September 1st 2025(until further notice).|Y
01|236055|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236055|5|4|of every order.|Y
01|236056|5|1|A tariff surcharge may be added to this quotation in|Y
01|236056|5|2|the event of a sustained tariff increase on the|Y
01|236056|5|3|importation of this product.  Any surcharge will be|Y
01|236056|5|4|disclosed prior to acceptance of an order.|Y
01|236057|2|1|A tariff surcharge may be added to this quotation in|Y
01|236057|2|2|the event of a sustained tariff increase on the|Y
01|236057|2|3|importation of this product.  Any surcharge will be|Y
01|236057|2|4|disclosed prior to acceptance of an order.|Y
01|236058|2|1|A tariff surcharge may be added to this quotation in|Y
01|236058|2|2|the event of a sustained tariff increase on the|Y
01|236058|2|3|importation of this product.  Any surcharge will be|Y
01|236058|2|4|disclosed prior to acceptance of an order.|Y
01|236059|7|1|A tariff surcharge may be added to this quotation in|Y
01|236059|7|2|the event of a sustained tariff increase on the|Y
01|236059|7|3|importation of this product.  Any surcharge will be|Y
01|236059|7|4|disclosed prior to acceptance of an order.|Y
01|236060|4|1|A tariff surcharge may be added to this quotation in|Y
01|236060|4|2|the event of a sustained tariff increase on the|Y
01|236060|4|3|importation of this product.  Any surcharge will be|Y
01|236060|4|4|disclosed prior to acceptance of an order.|Y
01|236061|2|1|Estimated lead time is 11~13 weeks after receipt of|Y
01|236061|2|2|an order.|Y
01|236061|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236061|8|2|placed after September 1st 2025(until further notice).|Y
01|236061|8|3|This surcharge will be acknowledged upon acceptance of|Y
01|236061|8|4|every order.|Y
01|236062|2|1|A tariff surcharge may be added to this quotation in|Y
01|236062|2|2|the event of a sustained tariff increase on the|Y
01|236062|2|3|importation of this product.  Any surcharge will be|Y
01|236062|2|4|disclosed prior to acceptance of an order.|Y
01|236063|1|1|Special Slim Line CAT40 90-degree Right Angle Head with|Y
01|236063|1|2|Threaded Spindle Interface for Mimatic Boring Head|Y
01|236063|2|1|Mimatic Special Adjustable Boring Head.|Y
01|236063|2|2|Suitable for ISO insert and fine diameter adjustment.|Y
01|236063|2|3|*Inserts are not supplied as these are triangular|Y
01|236063|2|4|ISO standard.|Y
01|236063|18|1|A tariff surcharge of 8% will be added to every order|Y
01|236063|18|2|placed after September 1st 2025(until further notice).|Y
01|236063|18|3|This surcharge will be acknowledged upon acceptance|Y
01|236063|18|4|of every order.|Y
01|236064|2|1|A tariff surcharge may be added to this quotation in|Y
01|236064|2|2|the event of a sustained tariff increase on the|Y
01|236064|2|3|importation of this product.  Any surcharge will be|Y
01|236064|2|4|disclosed prior to acceptance of an order.|Y
01|236065|2|1|A tariff surcharge may be added to this quotation in|Y
01|236065|2|2|the event of a sustained tariff increase on the|Y
01|236065|2|3|importation of this product.  Any surcharge will be|Y
01|236065|2|4|disclosed prior to acceptance of an order.|Y
01|236066|1|1|INS Req'd:1007619/JacobConsi(WH:YC)/Orizon(OK)|Y
01|236066|2|1|INS Req'd:1007619/JacobConsi(WH:YC)/Orizon(OK)|Y
01|236066|3|1|A tariff surcharge may be added to this quotation in|Y
01|236066|3|2|the event of a sustained tariff increase on the|Y
01|236066|3|3|importation of this product.  Any surcharge will be|Y
01|236066|3|4|disclosed prior to acceptance of an order.|Y
01|236067|2|1|A tariff surcharge may be added to this quotation in|Y
01|236067|2|2|the event of a sustained tariff increase on the|Y
01|236067|2|3|importation of this product.  Any surcharge will be|Y
01|236067|2|4|disclosed prior to acceptance of an order.|Y
01|236068|3|1|A tariff surcharge may be added to this quotation in|Y
01|236068|3|2|the event of a sustained tariff increase on the|Y
01|236068|3|3|importation of this product.  Any surcharge will be|Y
01|236068|3|4|disclosed prior to acceptance of an order.|Y
01|236069|3|1|A tariff surcharge may be added to this quotation in|Y
01|236069|3|2|the event of a sustained tariff increase on the|Y
01|236069|3|3|importation of this product.  Any surcharge will be|Y
01|236069|3|4|disclosed prior to acceptance of an order.|Y
01|236070|2|1|A tariff surcharge may be added to this quotation in|Y
01|236070|2|2|the event of a sustained tariff increase on the|Y
01|236070|2|3|importation of this product.  Any surcharge will be|Y
01|236070|2|4|disclosed prior to acceptance of an order.|Y
01|236071|7|1|A tariff surcharge may be added to this quotation in|Y
01|236071|7|2|the event of a sustained tariff increase on the|Y
01|236071|7|3|importation of this product.  Any surcharge will be|Y
01|236071|7|4|disclosed prior to acceptance of an order.|Y
01|236072|4|1|A tariff surcharge may be added to this quotation in|Y
01|236072|4|2|the event of a sustained tariff increase on the|Y
01|236072|4|3|importation of this product.  Any surcharge will be|Y
01|236072|4|4|disclosed prior to acceptance of an order.|Y
01|236073|3|1|A tariff surcharge may be added to this quotation in|Y
01|236073|3|2|the event of a sustained tariff increase on the|Y
01|236073|3|3|importation of this product.  Any surcharge will be|Y
01|236073|3|4|disclosed prior to acceptance of an order.|Y
01|236074|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236074|4|2|placed after September 1st 2025(until further notice).|Y
01|236074|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236074|4|4|of every order.|Y
01|236075|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236075|2|2|placed after September 1st 2025(until further notice).|Y
01|236075|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236075|2|4|of every order.|Y
01|236076|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236076|2|2|placed after September 1st 2025(until further notice).|Y
01|236076|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236076|2|4|of every order.|Y
01|236077|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236077|2|2|placed after September 1st 2025(until further notice).|Y
01|236077|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236077|2|4|of every order.|Y
01|236078|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236078|5|2|placed after September 1st 2025(until further notice).|Y
01|236078|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236078|5|4|of every order.|Y
01|236079|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236079|2|2|placed after September 1st 2025(until further notice).|Y
01|236079|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236079|2|4|of every order.|Y
01|236080|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236080|3|2|placed after September 1st 2025(until further notice).|Y
01|236080|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236080|3|4|of every order.|Y
01|236081|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236081|2|2|placed after September 1st 2025(until further notice).|Y
01|236081|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236081|2|4|of every order.|Y
01|236082|1|1|We currently have eight (8) in stock in Illinois.|Y
01|236082|1|2|The balance of 42 we do currently have 44 in stock at|Y
01|236082|1|3|the factory.  Estimated delivery would be Week of|Y
01|236082|1|4|August 25th due to Nikken being closed 8/11~8/15.|Y
01|236082|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236082|6|2|placed after September 1st 2025(until further notice).|Y
01|236082|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236082|6|4|of every order.|Y
01|236083|1|1|RGA#TAR-61833|Y
01|236083|1|2|5AX-2MT-105-120 SN:5248F|Y
01|236083|44|1|A tariff surcharge of 8% will be added to every order|Y
01|236083|44|2|placed after September 1st 2025(until further notice).|Y
01|236083|44|3|This surcharge will be acknowledged upon acceptance|Y
01|236083|44|4|of every order.|Y
01|236084|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236084|2|2|placed after September 1st 2025(until further notice).|Y
01|236084|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236084|2|4|of every order.|Y
01|236085|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236085|3|2|placed after September 1st 2025(until further notice).|Y
01|236085|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236085|3|4|of every order.|Y
01|236086|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236086|2|2|placed after September 1st 2025(until further notice).|Y
01|236086|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236086|2|4|of every order.|Y
01|236087|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236087|2|2|placed after September 1st 2025(until further notice).|Y
01|236087|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236087|2|4|of every order.|Y
01|236088|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236088|3|2|placed after September 1st 2025(until further notice).|Y
01|236088|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236088|3|4|of every order.|Y
01|236089|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236089|2|2|placed after September 1st 2025(until further notice).|Y
01|236089|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236089|2|4|of every order.|Y
01|236090|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236090|3|2|placed after September 1st 2025(until further notice).|Y
01|236090|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236090|3|4|of every order.|Y
01|236091|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236091|10|2|placed after September 1st 2025(until further notice).|Y
01|236091|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236091|10|4|of every order.|Y
01|236092|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236092|2|2|placed after September 1st 2025(until further notice).|Y
01|236092|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236092|2|4|of every order.|Y
01|236093|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236093|2|2|placed after September 1st 2025(until further notice).|Y
01|236093|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236093|2|4|of every order.|Y
01|236094|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236094|3|2|placed after September 1st 2025(until further notice).|Y
01|236094|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236094|3|4|of every order.|Y
01|236095|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236095|4|2|placed after September 1st 2025(until further notice).|Y
01|236095|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236095|4|4|of every order.|Y
01|236096|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236096|2|2|placed after September 1st 2025(until further notice).|Y
01|236096|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236096|2|4|of every order.|Y
01|236097|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236097|10|2|placed after September 1st 2025(until further notice).|Y
01|236097|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236097|10|4|of every order.|Y
01|236098|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236098|2|2|placed after September 1st 2025(until further notice).|Y
01|236098|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236098|2|4|of every order.|Y
01|236099|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236099|6|2|placed after September 1st 2025(until further notice).|Y
01|236099|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236099|6|4|of every order.|Y
01|236100|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236100|2|2|placed after September 1st 2025(until further notice).|Y
01|236100|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236100|2|4|of every order.|Y
01|236101|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236101|8|2|placed after September 1st 2025(until further notice).|Y
01|236101|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236101|8|4|of every order.|Y
01|236102|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236102|2|2|placed after September 1st 2025(until further notice).|Y
01|236102|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236102|2|4|of every order.|Y
01|236103|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236103|2|2|placed after September 1st 2025(until further notice).|Y
01|236103|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236103|2|4|of every order.|Y
01|236105|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236105|2|2|placed after September 1st 2025(until further notice).|Y
01|236105|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236105|2|4|of every order.|Y
01|236106|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236106|3|2|placed after September 1st 2025(until further notice).|Y
01|236106|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236106|3|4|of every order.|Y
01|236107|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236107|2|2|placed after September 1st 2025(until further notice).|Y
01|236107|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236107|2|4|of every order.|Y
01|236108|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236108|2|2|placed after September 1st 2025(until further notice).|Y
01|236108|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236108|2|4|of every order.|Y
01|236109|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236109|4|2|placed after September 1st 2025(until further notice).|Y
01|236109|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236109|4|4|of every order.|Y
01|236110|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236110|2|2|placed after September 1st 2025(until further notice).|Y
01|236110|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236110|2|4|of every order.|Y
01|236111|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236111|10|2|placed after September 1st 2025(until further notice).|Y
01|236111|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236111|10|4|of every order.|Y
01|236112|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236112|7|2|placed after September 1st 2025(until further notice).|Y
01|236112|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236112|7|4|of every order.|Y
01|236113|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236113|4|2|placed after September 1st 2025(until further notice).|Y
01|236113|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236113|4|4|of every order.|Y
01|236114|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236114|2|2|placed after September 1st 2025(until further notice).|Y
01|236114|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236114|2|4|of every order.|Y
01|236115|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236115|2|2|placed after September 1st 2025(until further notice).|Y
01|236115|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236115|2|4|of every order.|Y
01|236116|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236116|2|2|placed after September 1st 2025(until further notice).|Y
01|236116|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236116|2|4|of every order.|Y
01|236117|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236117|4|2|placed after September 1st 2025(until further notice).|Y
01|236117|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236117|4|4|of every order.|Y
01|236118|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236118|2|2|placed after September 1st 2025(until further notice).|Y
01|236118|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236118|2|4|of every order.|Y
01|236119|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236119|2|2|placed after September 1st 2025(until further notice).|Y
01|236119|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236119|2|4|of every order.|Y
01|236120|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236120|2|2|placed after September 1st 2025(until further notice).|Y
01|236120|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236120|2|4|of every order.|Y
01|236121|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236121|2|2|placed after September 1st 2025(until further notice).|Y
01|236121|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236121|2|4|of every order.|Y
01|236122|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236122|5|2|placed after September 1st 2025(until further notice).|Y
01|236122|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236122|5|4|of every order.|Y
01|236123|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236123|2|2|placed after September 1st 2025(until further notice).|Y
01|236123|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236123|2|4|of every order.|Y
01|236124|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236124|2|2|placed after September 1st 2025(until further notice).|Y
01|236124|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236124|2|4|of every order.|Y
01|236125|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236125|4|2|placed after September 1st 2025(until further notice).|Y
01|236125|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236125|4|4|of every order.|Y
01|236126|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236126|3|2|placed after September 1st 2025(until further notice).|Y
01|236126|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236126|3|4|of every order.|Y
01|236127|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236127|2|2|placed after September 1st 2025(until further notice).|Y
01|236127|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236127|2|4|of every order.|Y
01|236128|1|1|For DN Solutions DNM-5700II Fanuc Oi-MF+|Y
01|236128|1|2|Layout drawings required as well as signed approval|Y
01|236128|3|1|Northfield 4 3 Jaw chuck package with pneumatic|Y
01|236128|3|2|actuator. All hardware included. R-450 PNEU.|Y
01|236128|3|3|Each chuck includes 1 set of machinable soft jaws|Y
01|236128|3|4|Northfield QT# 20129|N
01|236128|3|5|Net $17621.00|N
01|236128|4|1|Sub Plate Set for table and tail stock. Independent|Y
01|236128|4|2|of each other. Mounting hardware included.|Y
01|236128|5|1|Includes controls package to support work holding|Y
01|236128|5|2|solenoids; Tailstock ADV/RET; Chuck Open/Close|Y
01|236128|5|3|Utilize User M-code Interface.  PLC modifications ...|Y
01|236128|5|4|not included in this proposal.  Simultaneous actuation|Y
01|236128|5|5|is standard. Please advise if sequencing is needed as|Y
01|236128|5|6|will require different hardware.|Y
01|236128|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236128|6|2|placed after September 1st 2025(until further notice).|Y
01|236128|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236128|6|4|of every order.|Y
01|236129|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236129|5|2|placed after September 1st 2025(until further notice).|Y
01|236129|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236129|5|4|of every order.|Y
01|236130|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236130|2|2|placed after September 1st 2025(until further notice).|Y
01|236130|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236130|2|4|of every order.|Y
01|236131|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236131|2|2|placed after September 1st 2025(until further notice).|Y
01|236131|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236131|2|4|of every order.|Y
01|236132|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236132|8|2|placed after September 1st 2025(until further notice).|Y
01|236132|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236132|8|4|of every order.|Y
01|236133|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236133|2|2|placed after September 1st 2025(until further notice).|Y
01|236133|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236133|2|4|of every order.|Y
01|236135|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236135|3|2|placed after September 1st 2025(until further notice).|Y
01|236135|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236135|3|4|of every order.|Y
01|236136|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236136|3|2|placed after September 1st 2025(until further notice).|Y
01|236136|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236136|3|4|of every order.|Y
01|236137|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236137|2|2|placed after September 1st 2025(until further notice).|Y
01|236137|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236137|2|4|of every order.|Y
01|236138|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236138|10|2|placed after September 1st 2025(until further notice).|Y
01|236138|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236138|10|4|of every order.|Y
01|236139|1|1|5AXZ-350FA-RCN2|Y
01|236139|1|2|SN: 3750|Y
01|236139|39|1|TCE-96406|Y
01|236139|39|2|Heidenhain Cable|Y
01|236139|40|1|Re-surfacing two rotary joints|Y
01|236139|-13|1|A tariff surcharge may be added to this quotation in|Y
01|236139|-13|2|the event of a sustained tariff increase on the|Y
01|236139|-13|3|importation of this product.  Any surcharge will be|Y
01|236139|-13|4|disclosed prior to acceptance of an order.|Y
01|236140|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236140|2|2|placed after September 1st 2025(until further notice).|Y
01|236140|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236140|2|4|of every order.|Y
01|236141|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236141|2|2|placed after September 1st 2025(until further notice).|Y
01|236141|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236141|2|4|of every order.|Y
01|236142|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236142|2|2|placed after September 1st 2025(until further notice).|Y
01|236142|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236142|2|4|of every order.|Y
01|236143|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236143|2|2|placed after September 1st 2025(until further notice).|Y
01|236143|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236143|2|4|of every order.|Y
01|236144|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236144|2|2|placed after September 1st 2025(until further notice).|Y
01|236144|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236144|2|4|of every order.|Y
01|236145|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236145|2|2|placed after September 1st 2025(until further notice).|Y
01|236145|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236145|2|4|of every order.|Y
01|236146|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236146|3|2|placed after September 1st 2025(until further notice).|Y
01|236146|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236146|3|4|of every order.|Y
01|236147|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236147|6|2|placed after September 1st 2025(until further notice).|Y
01|236147|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236147|6|4|of every order.|Y
01|236148|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236148|2|2|placed after September 1st 2025(until further notice).|Y
01|236148|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236148|2|4|of every order.|Y
01|236149|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236149|2|2|placed after September 1st 2025(until further notice).|Y
01|236149|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236149|2|4|of every order.|Y
01|236150|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236150|4|2|placed after September 1st 2025(until further notice).|Y
01|236150|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236150|4|4|of every order.|Y
01|236151|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236151|3|2|placed after September 1st 2025(until further notice).|Y
01|236151|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236151|3|4|of every order.|Y
01|236152|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236152|2|2|placed after September 1st 2025(until further notice).|Y
01|236152|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236152|2|4|of every order.|Y
01|236153|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236153|4|2|placed after September 1st 2025(until further notice).|Y
01|236153|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236153|4|4|of every order.|Y
01|236154|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236154|6|2|placed after September 1st 2025(until further notice).|Y
01|236154|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236154|6|4|of every order.|Y
01|236155|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236155|3|2|placed after September 1st 2025(until further notice).|Y
01|236155|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236155|3|4|of every order.|Y
01|236156|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236156|2|2|placed after September 1st 2025(until further notice).|Y
01|236156|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236156|2|4|of every order.|Y
01|236157|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236157|5|2|placed after September 1st 2025(until further notice).|Y
01|236157|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236157|5|4|of every order.|Y
01|236158|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236158|2|2|placed after September 1st 2025(until further notice).|Y
01|236158|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236158|2|4|of every order.|Y
01|236159|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236159|2|2|placed after September 1st 2025(until further notice).|Y
01|236159|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236159|2|4|of every order.|Y
01|236160|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236160|2|2|placed after September 1st 2025(until further notice).|Y
01|236160|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236160|2|4|of every order.|Y
01|236161|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236161|5|2|placed after September 1st 2025(until further notice).|Y
01|236161|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236161|5|4|of every order.|Y
01|236162|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236162|3|2|placed after September 1st 2025(until further notice).|Y
01|236162|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236162|3|4|of every order.|Y
01|236163|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236163|2|2|placed after September 1st 2025(until further notice).|Y
01|236163|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236163|2|4|of every order.|Y
01|236164|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236164|2|2|placed after September 1st 2025(until further notice).|Y
01|236164|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236164|2|4|of every order.|Y
01|236165|1|1|Honoring past orders of 12x HSK63A-MMC8C-107-AT-IDU|Y
01|236165|1|2|on quantity break pricing for Service Steel. Quote|Y
01|236165|1|3|reflects purchase of all 12 pieces in addition to 3|Y
01|236165|1|4|extra pieces on separate PO per conversation with Mike|Y
01|236165|1|5|and Steelville's other PO.|Y
01|236165|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236165|2|2|placed after September 1st 2025(until further notice).|Y
01|236165|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236165|2|4|of every order.|Y
01|236166|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236166|2|2|placed after September 1st 2025(until further notice).|Y
01|236166|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236166|2|4|of every order.|Y
01|236167|10|1|HSK63A-MMC4-116-AA-RP|Y
01|236167|10|2|Quoted at NET pricing|Y
01|236167|10|3|Non-standard stock/non-cancellable non-returnable.|Y
01|236167|13|1|A tariff surcharge may be added to this quotation in|Y
01|236167|13|2|the event of a sustained tariff increase on the|Y
01|236167|13|3|importation of this product.  Any surcharge will be|Y
01|236167|13|4|disclosed prior to acceptance of an order.|Y
01|236168|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236168|5|2|placed after September 1st 2025(until further notice).|Y
01|236168|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236168|5|4|of every order.|Y
01|236169|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236169|2|2|placed after September 1st 2025(until further notice).|Y
01|236169|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236169|2|4|of every order.|Y
01|236170|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236170|2|2|placed after September 1st 2025(until further notice).|Y
01|236170|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236170|2|4|of every order.|Y
01|236171|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236171|2|2|placed after September 1st 2025(until further notice).|Y
01|236171|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236171|2|4|of every order.|Y
01|236172|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236172|2|2|placed after September 1st 2025(until further notice).|Y
01|236172|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236172|2|4|of every order.|Y
01|236173|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236173|4|2|placed after September 1st 2025(until further notice).|Y
01|236173|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236173|4|4|of every order.|Y
01|236174|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236174|3|2|placed after September 1st 2025(until further notice).|Y
01|236174|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236174|3|4|of every order.|Y
01|236175|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236175|2|2|placed after September 1st 2025(until further notice).|Y
01|236175|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236175|2|4|of every order.|Y
01|236176|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236176|2|2|placed after September 1st 2025(until further notice).|Y
01|236176|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236176|2|4|of every order.|Y
01|236177|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236177|2|2|placed after September 1st 2025(until further notice).|Y
01|236177|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236177|2|4|of every order.|Y
01|236178|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236178|5|2|placed after September 1st 2025(until further notice).|Y
01|236178|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236178|5|4|of every order.|Y
01|236179|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236179|6|2|placed after September 1st 2025(until further notice).|Y
01|236179|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236179|6|4|of every order.|Y
01|236180|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236180|2|2|placed after September 1st 2025(until further notice).|Y
01|236180|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236180|2|4|of every order.|Y
01|236181|18|1|A tariff surcharge of 8% will be added to every order|Y
01|236181|18|2|placed after September 1st 2025(until further notice).|Y
01|236181|18|3|This surcharge will be acknowledged upon acceptance|Y
01|236181|18|4|of every order.|Y
01|236182|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236182|3|2|placed after September 1st 2025(until further notice).|Y
01|236182|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236182|3|4|of every order.|Y
01|236183|1|1|Estimated lead time is end of August/beginning of|Y
01|236183|1|2|September after receipt of an order.  Factory is closed|Y
01|236183|1|3|8/11~8/15.|Y
01|236183|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236183|7|2|placed after September 1st 2025(until further notice).|Y
01|236183|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236183|7|4|of every order.|Y
01|236184|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236184|2|2|placed after September 1st 2025(until further notice).|Y
01|236184|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236184|2|4|of every order.|Y
01|236185|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236185|6|2|placed after September 1st 2025(until further notice).|Y
01|236185|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236185|6|4|of every order.|Y
01|236186|13|1|A tariff surcharge of 8% will be added to every order|Y
01|236186|13|2|placed after September 1st 2025(until further notice).|Y
01|236186|13|3|This surcharge will be acknowledged upon acceptance|Y
01|236186|13|4|of every order.|Y
01|236187|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236187|2|2|placed after September 1st 2025(until further notice).|Y
01|236187|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236187|2|4|of every order.|Y
01|236188|5|1|NBT50-FMC22-105|Y
01|236188|5|2|NBT50 DualContact Shell Mill Holder 22mm Coolant Ports|Y
01|236188|6|1|NBT50-FMH22-47-105|Y
01|236188|6|2|NBT50 DualContact Shell Mill Holder 22mm Coolnatports|Y
01|236188|35|1|A tariff surcharge may be added to this quotation in|Y
01|236188|35|2|the event of a sustained tariff increase on the|Y
01|236188|35|3|importation of this product.  Any surcharge will be|Y
01|236188|35|4|disclosed prior to acceptance of an order.|Y
01|236189|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236189|4|2|placed after September 1st 2025(until further notice).|Y
01|236189|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236189|4|4|of every order.|Y
01|236190|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236190|2|2|placed after September 1st 2025(until further notice).|Y
01|236190|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236190|2|4|of every order.|Y
01|236191|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236191|2|2|placed after September 1st 2025(until further notice).|Y
01|236191|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236191|2|4|of every order.|Y
01|236192|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236192|2|2|placed after September 1st 2025(until further notice).|Y
01|236192|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236192|2|4|of every order.|Y
01|236193|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236193|2|2|placed after September 1st 2025(until further notice).|Y
01|236193|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236193|2|4|of every order.|Y
01|236194|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236194|2|2|placed after September 1st 2025(until further notice).|Y
01|236194|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236194|2|4|of every order.|Y
01|236196|15|1|A tariff surcharge of 8% will be added to every order|Y
01|236196|15|2|placed after September 1st 2025(until further notice).|Y
01|236196|15|3|This surcharge will be acknowledged upon acceptance|Y
01|236196|15|4|of every order.|Y
01|236197|14|1|A tariff surcharge of 8% will be added to every order|Y
01|236197|14|2|placed after September 1st 2025(until further notice).|Y
01|236197|14|3|This surcharge will be acknowledged upon acceptance|Y
01|236197|14|4|of every order.|Y
01|236198|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236198|2|2|placed after September 1st 2025(until further notice).|Y
01|236198|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236198|2|4|of every order.|Y
01|236199|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236199|8|2|placed after September 1st 2025(until further notice).|Y
01|236199|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236199|8|4|of every order.|Y
01|236200|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236200|3|2|placed after September 1st 2025(until further notice).|Y
01|236200|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236200|3|4|of every order.|Y
01|236201|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236201|9|2|placed after September 1st 2025(until further notice).|Y
01|236201|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236201|9|4|of every order.|Y
01|236202|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236202|2|2|placed after September 1st 2025(until further notice).|Y
01|236202|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236202|2|4|of every order.|Y
01|236203|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236203|2|2|placed after September 1st 2025(until further notice).|Y
01|236203|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236203|2|4|of every order.|Y
01|236204|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236204|4|2|placed after September 1st 2025(until further notice).|Y
01|236204|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236204|4|4|of every order.|Y
01|236205|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236205|2|2|placed after September 1st 2025(until further notice).|Y
01|236205|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236205|2|4|of every order.|Y
01|236206|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236206|3|2|placed after September 1st 2025(until further notice).|Y
01|236206|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236206|3|4|of every order.|Y
01|236207|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236207|3|2|placed after September 1st 2025(until further notice).|Y
01|236207|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236207|3|4|of every order.|Y
01|236208|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236208|4|2|placed after September 1st 2025(until further notice).|Y
01|236208|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236208|4|4|of every order.|Y
01|236209|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236209|2|2|placed after September 1st 2025(until further notice).|Y
01|236209|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236209|2|4|of every order.|Y
01|236210|1|1|Please note this is a non-standard stock item. Once PO|Y
01|236210|1|2|or order issued these cannot be cancelled or returned.|Y
01|236210|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236210|3|2|placed after September 1st 2025(until further notice).|Y
01|236210|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236210|3|4|of every order.|Y
01|236211|11|1|A tariff surcharge of 8% will be added to every order|Y
01|236211|11|2|placed after September 1st 2025(until further notice).|Y
01|236211|11|3|This surcharge will be acknowledged upon acceptance|Y
01|236211|11|4|of every order.|Y
01|236212|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236212|2|2|placed after September 1st 2025(until further notice).|Y
01|236212|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236212|2|4|of every order.|Y
01|236213|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236213|2|2|placed after September 1st 2025(until further notice).|Y
01|236213|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236213|2|4|of every order.|Y
01|236214|9|1|A tariff surcharge may be added to this quotation in|Y
01|236214|9|2|the event of a sustained tariff increase on the|Y
01|236214|9|3|importation of this product.  Any surcharge will be|Y
01|236214|9|4|disclosed prior to acceptance of an order.|Y
01|236215|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236215|2|2|placed after September 1st 2025(until further notice).|Y
01|236215|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236215|2|4|of every order.|Y
01|236216|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236216|2|2|placed after September 1st 2025(until further notice).|Y
01|236216|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236216|2|4|of every order.|Y
01|236217|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236217|2|2|placed after September 1st 2025(until further notice).|Y
01|236217|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236217|2|4|of every order.|Y
01|236218|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236218|7|2|placed after September 1st 2025(until further notice).|Y
01|236218|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236218|7|4|of every order.|Y
01|236219|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236219|2|2|placed after September 1st 2025(until further notice).|Y
01|236219|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236219|2|4|of every order.|Y
01|236220|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236220|2|2|placed after September 1st 2025(until further notice).|Y
01|236220|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236220|2|4|of every order.|Y
01|236221|11|1|A tariff surcharge of 8% will be added to every order|Y
01|236221|11|2|placed after September 1st 2025(until further notice).|Y
01|236221|11|3|This surcharge will be acknowledged upon acceptance|Y
01|236221|11|4|of every order.|Y
01|236222|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236222|3|2|placed after September 1st 2025(until further notice).|Y
01|236222|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236222|3|4|of every order.|Y
01|236223|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236223|2|2|placed after September 1st 2025(until further notice).|Y
01|236223|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236223|2|4|of every order.|Y
01|236224|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236224|2|2|placed after September 1st 2025(until further notice).|Y
01|236224|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236224|2|4|of every order.|Y
01|236225|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236225|3|2|placed after September 1st 2025(until further notice).|Y
01|236225|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236225|3|4|of every order.|Y
01|236226|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236226|2|2|placed after September 1st 2025(until further notice).|Y
01|236226|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236226|2|4|of every order.|Y
01|236227|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236227|9|2|placed after September 1st 2025(until further notice).|Y
01|236227|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236227|9|4|of every order.|Y
01|236228|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236228|10|2|placed after September 1st 2025(until further notice).|Y
01|236228|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236228|10|4|of every order.|Y
01|236229|14|1|A tariff surcharge of 8% will be added to every order|Y
01|236229|14|2|placed after September 1st 2025(until further notice).|Y
01|236229|14|3|This surcharge will be acknowledged upon acceptance|Y
01|236229|14|4|of every order.|Y
01|236230|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236230|4|2|placed after September 1st 2025(until further notice).|Y
01|236230|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236230|4|4|of every order.|Y
01|236231|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236231|2|2|placed after September 1st 2025(until further notice).|Y
01|236231|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236231|2|4|of every order.|Y
01|236232|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236232|2|2|placed after September 1st 2025(until further notice).|Y
01|236232|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236232|2|4|of every order.|Y
01|236233|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236233|3|2|placed after September 1st 2025(until further notice).|Y
01|236233|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236233|3|4|of every order.|Y
01|236234|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236234|8|2|placed after September 1st 2025(until further notice).|Y
01|236234|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236234|8|4|of every order.|Y
01|236235|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236235|2|2|placed after September 1st 2025(until further notice).|Y
01|236235|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236235|2|4|of every order.|Y
01|236237|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236237|3|2|placed after September 1st 2025(until further notice).|Y
01|236237|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236237|3|4|of every order.|Y
01|236238|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236238|10|2|placed after September 1st 2025(until further notice).|Y
01|236238|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236238|10|4|of every order.|Y
01|236239|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236239|2|2|placed after September 1st 2025(until further notice).|Y
01|236239|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236239|2|4|of every order.|Y
01|236241|32|1|A tariff surcharge of 8% will be added to every order|Y
01|236241|32|2|placed after September 1st 2025(until further notice).|Y
01|236241|32|3|This surcharge will be acknowledged upon acceptance|Y
01|236241|32|4|of every order.|Y
01|236242|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236242|3|2|placed after September 1st 2025(until further notice).|Y
01|236242|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236242|3|4|of every order.|Y
01|236243|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236243|2|2|placed after September 1st 2025(until further notice).|Y
01|236243|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236243|2|4|of every order.|Y
01|236244|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236244|6|2|placed after September 1st 2025(until further notice).|Y
01|236244|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236244|6|4|of every order.|Y
01|236245|2|1|CAT40-Z16-125U|Y
01|236245|2|2|CAT40 Z16 Tension/Compression Tap Holder|Y
01|236245|17|1|A tariff surcharge of 8% will be added to every order|Y
01|236245|17|2|placed after September 1st 2025(until further notice).|Y
01|236245|17|3|This surcharge will be acknowledged upon acceptance|Y
01|236245|17|4|of every order.|Y
01|236246|1|1|HSK63A-SK13-70P|Y
01|236246|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236246|5|2|placed after September 1st 2025(until further notice).|Y
01|236246|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236246|5|4|of every order.|Y
01|236247|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236247|3|2|placed after September 1st 2025(until further notice).|Y
01|236247|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236247|3|4|of every order.|Y
01|236248|39|1|replacement part# for SKN-10BJ|Y
01|236248|62|1|A tariff surcharge of 8% will be added to every order|Y
01|236248|62|2|placed after September 1st 2025(until further notice).|Y
01|236248|62|3|This surcharge will be acknowledged upon acceptance|Y
01|236248|62|4|of every order.|Y
01|236249|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236249|3|2|placed after September 1st 2025(until further notice).|Y
01|236249|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236249|3|4|of every order.|Y
01|236250|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236250|2|2|placed after September 1st 2025(until further notice).|Y
01|236250|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236250|2|4|of every order.|Y
01|236251|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236251|3|2|placed after September 1st 2025(until further notice).|Y
01|236251|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236251|3|4|of every order.|Y
01|236252|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236252|6|2|placed after September 1st 2025(until further notice).|Y
01|236252|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236252|6|4|of every order.|Y
01|236253|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236253|8|2|placed after September 1st 2025(until further notice).|Y
01|236253|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236253|8|4|of every order.|Y
01|236254|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236254|2|2|placed after September 1st 2025(until further notice).|Y
01|236254|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236254|2|4|of every order.|Y
01|236255|18|1|A tariff surcharge of 8% will be added to every order|Y
01|236255|18|2|placed after September 1st 2025(until further notice).|Y
01|236255|18|3|This surcharge will be acknowledged upon acceptance|Y
01|236255|18|4|of every order.|Y
01|236256|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236256|2|2|placed after September 1st 2025(until further notice).|Y
01|236256|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236256|2|4|of every order.|Y
01|236257|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236257|3|2|placed after September 1st 2025(until further notice).|Y
01|236257|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236257|3|4|of every order.|Y
01|236258|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236258|2|2|placed after September 1st 2025(until further notice).|Y
01|236258|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236258|2|4|of every order.|Y
01|236259|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236259|7|2|placed after September 1st 2025(until further notice).|Y
01|236259|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236259|7|4|of every order.|Y
01|236260|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236260|5|2|placed after September 1st 2025(until further notice).|Y
01|236260|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236260|5|4|of every order.|Y
01|236261|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236261|2|2|placed after September 1st 2025(until further notice).|Y
01|236261|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236261|2|4|of every order.|Y
01|236262|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236262|4|2|placed after September 1st 2025(until further notice).|Y
01|236262|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236262|4|4|of every order.|Y
01|236263|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236263|6|2|placed after September 1st 2025(until further notice).|Y
01|236263|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236263|6|4|of every order.|Y
01|236264|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236264|2|2|placed after September 1st 2025(until further notice).|Y
01|236264|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236264|2|4|of every order.|Y
01|236265|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236265|2|2|placed after September 1st 2025(until further notice).|Y
01|236265|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236265|2|4|of every order.|Y
01|236266|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236266|4|2|placed after September 1st 2025(until further notice).|Y
01|236266|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236266|4|4|of every order.|Y
01|236267|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236267|5|2|placed after September 1st 2025(until further notice).|Y
01|236267|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236267|5|4|of every order.|Y
01|236268|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236268|3|2|placed after September 1st 2025(until further notice).|Y
01|236268|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236268|3|4|of every order.|Y
01|236269|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236269|3|2|placed after September 1st 2025(until further notice).|Y
01|236269|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236269|3|4|of every order.|Y
01|236270|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236270|9|2|placed after September 1st 2025(until further notice).|Y
01|236270|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236270|9|4|of every order.|Y
01|236271|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236271|4|2|placed after September 1st 2025(until further notice).|Y
01|236271|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236271|4|4|of every order.|Y
01|236272|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236272|7|2|placed after September 1st 2025(until further notice).|Y
01|236272|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236272|7|4|of every order.|Y
01|236273|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236273|4|2|placed after September 1st 2025(until further notice).|Y
01|236273|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236273|4|4|of every order.|Y
01|236274|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236274|2|2|placed after September 1st 2025(until further notice).|Y
01|236274|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236274|2|4|of every order.|Y
01|236275|1|1|WILL USE EXISTING H63A SPINDLE FROM E460N PRESETTER|Y
01|236275|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236275|2|2|placed after September 1st 2025(until further notice).|Y
01|236275|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236275|2|4|of every order.|Y
01|236276|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236276|2|2|placed after September 1st 2025(until further notice).|Y
01|236276|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236276|2|4|of every order.|Y
01|236277|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236277|4|2|placed after September 1st 2025(until further notice).|Y
01|236277|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236277|4|4|of every order.|Y
01|236278|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236278|2|2|placed after September 1st 2025(until further notice).|Y
01|236278|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236278|2|4|of every order.|Y
01|236279|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236279|2|2|placed after September 1st 2025(until further notice).|Y
01|236279|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236279|2|4|of every order.|Y
01|236280|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236280|3|2|placed after September 1st 2025(until further notice).|Y
01|236280|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236280|3|4|of every order.|Y
01|236281|1|1|For C40RAM-ER32-180ICE-65TP (1)WH1 (4)ETA 8/22|Y
01|236281|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236281|2|2|placed after September 1st 2025(until further notice).|Y
01|236281|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236281|2|4|of every order.|Y
01|236282|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236282|3|2|placed after September 1st 2025(until further notice).|Y
01|236282|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236282|3|4|of every order.|Y
01|236283|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236283|2|2|placed after September 1st 2025(until further notice).|Y
01|236283|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236283|2|4|of every order.|Y
01|236284|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236284|2|2|placed after September 1st 2025(until further notice).|Y
01|236284|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236284|2|4|of every order.|Y
01|236285|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236285|4|2|placed after September 1st 2025(until further notice).|Y
01|236285|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236285|4|4|of every order.|Y
01|236286|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236286|3|2|placed after September 1st 2025(until further notice).|Y
01|236286|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236286|3|4|of every order.|Y
01|236287|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236287|2|2|placed after September 1st 2025(until further notice).|Y
01|236287|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236287|2|4|of every order.|Y
01|236288|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236288|5|2|placed after September 1st 2025(until further notice).|Y
01|236288|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236288|5|4|of every order.|Y
01|236289|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236289|2|2|placed after September 1st 2025(until further notice).|Y
01|236289|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236289|2|4|of every order.|Y
01|236290|19|1|A tariff surcharge of 8% will be added to every order|Y
01|236290|19|2|placed after September 1st 2025(until further notice).|Y
01|236290|19|3|This surcharge will be acknowledged upon acceptance|Y
01|236290|19|4|of every order.|Y
01|236291|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236291|2|2|placed after September 1st 2025(until further notice).|Y
01|236291|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236291|2|4|of every order.|Y
01|236292|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236292|2|2|placed after September 1st 2025(until further notice).|Y
01|236292|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236292|2|4|of every order.|Y
01|236293|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236293|5|2|placed after September 1st 2025(until further notice).|Y
01|236293|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236293|5|4|of every order.|Y
01|236294|4|1|Please note additional 20% applied per overstock promo.|Y
01|236294|4|2|Once PO/order issued these cannot be cancelled or|Y
01|236294|4|3|returned. Upon stock depletion these will needed to be|Y
01|236294|4|4|requoted for price and availability.|Y
01|236294|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236294|7|2|placed after September 1st 2025(until further notice).|Y
01|236294|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236294|7|4|of every order.|Y
01|236295|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236295|3|2|placed after September 1st 2025(until further notice).|Y
01|236295|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236295|3|4|of every order.|Y
01|236296|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|236296|-13|2|placed after September 1st 2025(until further notice).|Y
01|236296|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|236296|-13|4|of every order.|Y
01|236297|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236297|2|2|placed after September 1st 2025(until further notice).|Y
01|236297|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236297|2|4|of every order.|Y
01|236298|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236298|5|2|placed after September 1st 2025(until further notice).|Y
01|236298|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236298|5|4|of every order.|Y
01|236299|8|1|Quoted at NET price.|Y
01|236299|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236299|9|2|placed after September 1st 2025(until further notice).|Y
01|236299|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236299|9|4|of every order.|Y
01|236300|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236300|4|2|placed after September 1st 2025(until further notice).|Y
01|236300|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236300|4|4|of every order.|Y
01|236301|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236301|4|2|placed after September 1st 2025(until further notice).|Y
01|236301|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236301|4|4|of every order.|Y
01|236302|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236302|3|2|placed after September 1st 2025(until further notice).|Y
01|236302|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236302|3|4|of every order.|Y
01|236303|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236303|2|2|placed after September 1st 2025(until further notice).|Y
01|236303|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236303|2|4|of every order.|Y
01|236304|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236304|6|2|placed after September 1st 2025(until further notice).|Y
01|236304|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236304|6|4|of every order.|Y
01|236305|4|1|Option 1: make own block with our bushing|Y
01|236305|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236305|9|2|placed after September 1st 2025(until further notice).|Y
01|236305|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236305|9|4|of every order.|Y
01|236306|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236306|6|2|placed after September 1st 2025(until further notice).|Y
01|236306|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236306|6|4|of every order.|Y
01|236307|21|1|A tariff surcharge of 8% will be added to every order|Y
01|236307|21|2|placed after September 1st 2025(until further notice).|Y
01|236307|21|3|This surcharge will be acknowledged upon acceptance|Y
01|236307|21|4|of every order.|Y
01|236308|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236308|2|2|placed after September 1st 2025(until further notice).|Y
01|236308|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236308|2|4|of every order.|Y
01|236309|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236309|10|2|placed after September 1st 2025(until further notice).|Y
01|236309|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236309|10|4|of every order.|Y
01|236310|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236310|2|2|placed after September 1st 2025(until further notice).|Y
01|236310|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236310|2|4|of every order.|Y
01|236311|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236311|2|2|placed after September 1st 2025(until further notice).|Y
01|236311|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236311|2|4|of every order.|Y
01|236312|16|1|A tariff surcharge of 8% will be added to every order|Y
01|236312|16|2|placed after September 1st 2025(until further notice).|Y
01|236312|16|3|This surcharge will be acknowledged upon acceptance|Y
01|236312|16|4|of every order.|Y
01|236313|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236313|5|2|placed after September 1st 2025(until further notice).|Y
01|236313|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236313|5|4|of every order.|Y
01|236314|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236314|2|2|placed after September 1st 2025(until further notice).|Y
01|236314|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236314|2|4|of every order.|Y
01|236315|1|1|Included HSK63 Spindle|Y
01|236315|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236315|7|2|placed after September 1st 2025(until further notice).|Y
01|236315|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236315|7|4|of every order.|Y
01|236316|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236316|2|2|placed after September 1st 2025(until further notice).|Y
01|236316|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236316|2|4|of every order.|Y
01|236317|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236317|5|2|placed after September 1st 2025(until further notice).|Y
01|236317|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236317|5|4|of every order.|Y
01|236318|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236318|3|2|placed after September 1st 2025(until further notice).|Y
01|236318|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236318|3|4|of every order.|Y
01|236319|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236319|2|2|placed after September 1st 2025(until further notice).|Y
01|236319|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236319|2|4|of every order.|Y
01|236320|13|1|A tariff surcharge of 8% will be added to every order|Y
01|236320|13|2|placed after September 1st 2025(until further notice).|Y
01|236320|13|3|This surcharge will be acknowledged upon acceptance|Y
01|236320|13|4|of every order.|Y
01|236321|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236321|5|2|placed after September 1st 2025(until further notice).|Y
01|236321|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236321|5|4|of every order.|Y
01|236322|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236322|5|2|placed after September 1st 2025(until further notice).|Y
01|236322|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236322|5|4|of every order.|Y
01|236323|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236323|3|2|placed after September 1st 2025(until further notice).|Y
01|236323|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236323|3|4|of every order.|Y
01|236324|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236324|4|2|placed after September 1st 2025(until further notice).|Y
01|236324|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236324|4|4|of every order.|Y
01|236325|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236325|3|2|placed after September 1st 2025(until further notice).|Y
01|236325|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236325|3|4|of every order.|Y
01|236326|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236326|6|2|placed after September 1st 2025(until further notice).|Y
01|236326|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236326|6|4|of every order.|Y
01|236327|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236327|5|2|placed after September 1st 2025(until further notice).|Y
01|236327|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236327|5|4|of every order.|Y
01|236328|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236328|2|2|placed after September 1st 2025(until further notice).|Y
01|236328|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236328|2|4|of every order.|Y
01|236329|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236329|2|2|placed after September 1st 2025(until further notice).|Y
01|236329|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236329|2|4|of every order.|Y
01|236330|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236330|2|2|placed after September 1st 2025(until further notice).|Y
01|236330|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236330|2|4|of every order.|Y
01|236331|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236331|2|2|placed after September 1st 2025(until further notice).|Y
01|236331|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236331|2|4|of every order.|Y
01|236332|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236332|3|2|placed after September 1st 2025(until further notice).|Y
01|236332|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236332|3|4|of every order.|Y
01|236333|1|1|Special Slim Line 90-degree Right Angle Head with|Y
01|236333|1|2|Threaded Spindle Interface for Mimatic Boring Head|Y
01|236333|1|3|CAT40 taper.|Y
01|236333|2|1|Mimatic Special Adjustable Boring Head.|Y
01|236333|2|2|Suitable for ISO insert and fine diameter adjustment.|Y
01|236333|2|3|*Inserts are not supplied as these are triangular|Y
01|236333|2|4|ISO standard.|Y
01|236333|3|1|A tariff surcharge may be added to this quotation in|Y
01|236333|3|2|the event of a sustained tariff increase on the|Y
01|236333|3|3|importation of this product.  Any surcharge will be|Y
01|236333|3|4|disclosed prior to acceptance of an order.|Y
01|236334|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236334|3|2|placed after September 1st 2025(until further notice).|Y
01|236334|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236334|3|4|of every order.|Y
01|236335|15|1|A tariff surcharge of 8% will be added to every order|Y
01|236335|15|2|placed after September 1st 2025(until further notice).|Y
01|236335|15|3|This surcharge will be acknowledged upon acceptance|Y
01|236335|15|4|of every order.|Y
01|236336|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236336|2|2|placed after September 1st 2025(until further notice).|Y
01|236336|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236336|2|4|of every order.|Y
01|236337|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236337|3|2|placed after September 1st 2025(until further notice).|Y
01|236337|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236337|3|4|of every order.|Y
01|236338|4|1|Installation includes: Parameter changes mounting of|Y
01|236338|4|2|the table  routing the external cables service time|Y
01|236338|4|3|and travel.|Y
01|236339|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236339|2|2|placed after September 1st 2025(until further notice).|Y
01|236339|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236339|2|4|of every order.|Y
01|236340|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236340|3|2|placed after September 1st 2025(until further notice).|Y
01|236340|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236340|3|4|of every order.|Y
01|236341|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236341|3|2|placed after September 1st 2025(until further notice).|Y
01|236341|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236341|3|4|of every order.|Y
01|236342|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236342|4|2|placed after September 1st 2025(until further notice).|Y
01|236342|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236342|4|4|of every order.|Y
01|236343|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236343|2|2|placed after September 1st 2025(until further notice).|Y
01|236343|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236343|2|4|of every order.|Y
01|236344|2|1|A tariff surcharge may be added to this quotation in|Y
01|236344|2|2|the event of a sustained tariff increase on the|Y
01|236344|2|3|importation of this product.  Any surcharge will be|Y
01|236344|2|4|disclosed prior to acceptance of an order.|Y
01|236345|7|1|BMT45-ER16-AD-ICE|Y
01|236345|7|2|MIM# A195810|Y
01|236345|8|1|USE FOR REFERENCE|Y
01|236345|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236345|9|2|placed after September 1st 2025(until further notice).|Y
01|236345|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236345|9|4|of every order.|Y
01|236346|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236346|10|2|placed after September 1st 2025(until further notice).|Y
01|236346|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236346|10|4|of every order.|Y
01|236347|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236347|3|2|placed after September 1st 2025(until further notice).|Y
01|236347|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236347|3|4|of every order.|Y
01|236348|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236348|2|2|placed after September 1st 2025(until further notice).|Y
01|236348|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236348|2|4|of every order.|Y
01|236349|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236349|2|2|placed after September 1st 2025(until further notice).|Y
01|236349|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236349|2|4|of every order.|Y
01|236350|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236350|4|2|placed after September 1st 2025(until further notice).|Y
01|236350|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236350|4|4|of every order.|Y
01|236351|13|1|A tariff surcharge of 8% will be added to every order|Y
01|236351|13|2|placed after September 1st 2025(until further notice).|Y
01|236351|13|3|This surcharge will be acknowledged upon acceptance|Y
01|236351|13|4|of every order.|Y
01|236352|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236352|2|2|placed after September 1st 2025(until further notice).|Y
01|236352|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236352|2|4|of every order.|Y
01|236353|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236353|3|2|placed after September 1st 2025(until further notice).|Y
01|236353|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236353|3|4|of every order.|Y
01|236354|1|1|**Special one-time price for showroom model**|Y
01|236354|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236354|3|2|placed after September 1st 2025(until further notice).|Y
01|236354|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236354|3|4|of every order.|Y
01|236355|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236355|3|2|placed after September 1st 2025(until further notice).|Y
01|236355|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236355|3|4|of every order.|Y
01|236356|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236356|2|2|placed after September 1st 2025(until further notice).|Y
01|236356|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236356|2|4|of every order.|Y
01|236357|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236357|3|2|placed after September 1st 2025(until further notice).|Y
01|236357|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236357|3|4|of every order.|Y
01|236358|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236358|6|2|placed after September 1st 2025(until further notice).|Y
01|236358|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236358|6|4|of every order.|Y
01|236359|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236359|6|2|placed after September 1st 2025(until further notice).|Y
01|236359|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236359|6|4|of every order.|Y
01|236360|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236360|2|2|placed after September 1st 2025(until further notice).|Y
01|236360|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236360|2|4|of every order.|Y
01|236361|9|1|Lyndex-Nikken Part number to be determined.|Y
01|236361|9|2|Mimatic #121512 Straight tool holder with BT40 input|Y
01|236361|9|3|and MI quick change output.|Y
01|236361|31|1|A tariff surcharge of 8% will be added to every order|Y
01|236361|31|2|placed after September 1st 2025(until further notice).|Y
01|236361|31|3|This surcharge will be acknowledged upon acceptance|Y
01|236361|31|4|of every order.|Y
01|236362|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236362|9|2|placed after September 1st 2025(until further notice).|Y
01|236362|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236362|9|4|of every order.|Y
01|236363|18|1|A tariff surcharge of 8% will be added to every order|Y
01|236363|18|2|placed after September 1st 2025(until further notice).|Y
01|236363|18|3|This surcharge will be acknowledged upon acceptance|Y
01|236363|18|4|of every order.|Y
01|236364|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236364|2|2|placed after September 1st 2025(until further notice).|Y
01|236364|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236364|2|4|of every order.|Y
01|236365|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236365|2|2|placed after September 1st 2025(until further notice).|Y
01|236365|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236365|2|4|of every order.|Y
01|236366|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236366|2|2|placed after September 1st 2025(until further notice).|Y
01|236366|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236366|2|4|of every order.|Y
01|236367|3|1|*No Coolant Option|Y
01|236367|4|1|*Coolant-Thru Option|Y
01|236367|12|1|A tariff surcharge of 8% will be added to every order|Y
01|236367|12|2|placed after September 1st 2025(until further notice).|Y
01|236367|12|3|This surcharge will be acknowledged upon acceptance|Y
01|236367|12|4|of every order.|Y
01|236368|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236368|2|2|placed after September 1st 2025(until further notice).|Y
01|236368|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236368|2|4|of every order.|Y
01|236369|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236369|5|2|placed after September 1st 2025(until further notice).|Y
01|236369|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236369|5|4|of every order.|Y
01|236370|15|1|A tariff surcharge of 8% will be added to every order|Y
01|236370|15|2|placed after September 1st 2025(until further notice).|Y
01|236370|15|3|This surcharge will be acknowledged upon acceptance|Y
01|236370|15|4|of every order.|Y
01|236371|2|1|Power and Feedback Cables from Nikken Table to machine|Y
01|236371|2|2|bulkhead|Y
01|236371|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236371|3|2|placed after September 1st 2025(until further notice).|Y
01|236371|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236371|3|4|of every order.|Y
01|236372|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236372|2|2|placed after September 1st 2025(until further notice).|Y
01|236372|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236372|2|4|of every order.|Y
01|236373|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236373|2|2|placed after September 1st 2025(until further notice).|Y
01|236373|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236373|2|4|of every order.|Y
01|236374|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236374|2|2|placed after September 1st 2025(until further notice).|Y
01|236374|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236374|2|4|of every order.|Y
01|236375|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236375|2|2|placed after September 1st 2025(until further notice).|Y
01|236375|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236375|2|4|of every order.|Y
01|236376|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236376|2|2|placed after September 1st 2025(until further notice).|Y
01|236376|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236376|2|4|of every order.|Y
01|236377|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236377|2|2|placed after September 1st 2025(until further notice).|Y
01|236377|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236377|2|4|of every order.|Y
01|236378|1|1|Please allow 12 weeks for manufacturing & delivery|Y
01|236378|1|2|time upon receival of signed approval drawing. These|Y
01|236378|1|3|are considered special and have been quoted at special|Y
01|236378|1|4|net price. Once PO/order issued these cannot be|Y
01|236378|1|5|cancelled or returned.|Y
01|236378|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236378|3|2|placed after September 1st 2025(until further notice).|Y
01|236378|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236378|3|4|of every order.|Y
01|236379|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236379|3|2|placed after September 1st 2025(until further notice).|Y
01|236379|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236379|3|4|of every order.|Y
01|236380|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236380|6|2|placed after September 1st 2025(until further notice).|Y
01|236380|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236380|6|4|of every order.|Y
01|236381|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236381|9|2|placed after September 1st 2025(until further notice).|Y
01|236381|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236381|9|4|of every order.|Y
01|236383|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236383|4|2|placed after September 1st 2025(until further notice).|Y
01|236383|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236383|4|4|of every order.|Y
01|236384|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236384|5|2|placed after September 1st 2025(until further notice).|Y
01|236384|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236384|5|4|of every order.|Y
01|236385|11|1|A tariff surcharge of 8% will be added to every order|Y
01|236385|11|2|placed after September 1st 2025(until further notice).|Y
01|236385|11|3|This surcharge will be acknowledged upon acceptance|Y
01|236385|11|4|of every order.|Y
01|236386|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236386|3|2|placed after September 1st 2025(until further notice).|Y
01|236386|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236386|3|4|of every order.|Y
01|236387|11|1|A tariff surcharge may be added to this quotation in|Y
01|236387|11|2|the event of a sustained tariff increase on the|Y
01|236387|11|3|importation of this product.  Any surcharge will be|Y
01|236387|11|4|disclosed prior to acceptance of an order.|Y
01|236388|2|1|H80F-SF0250-3.00B|Y
01|236388|2|2|HSK80F Shrink Fit Holder 1/4 DrivePins Balanceable 20K|Y
01|236388|3|1|H80F-SF0375-3.50B|Y
01|236388|3|2|HSK80F Shrink Fit Holder 3/8 20K|Y
01|236388|4|1|H80F-SF0500-3.50B|Y
01|236388|4|2|HSK80F Shrink Fit Holder 1/2 20K|Y
01|236388|7|1|H80F-SF1000-3.00B|Y
01|236388|7|2|HSK80F Shrink Fit Holder 1 DrivePins Balanceable 20K|Y
01|236388|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236388|8|2|placed after September 1st 2025(until further notice).|Y
01|236388|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236388|8|4|of every order.|Y
01|236389|13|1|A tariff surcharge of 8% will be added to every order|Y
01|236389|13|2|placed after September 1st 2025(until further notice).|Y
01|236389|13|3|This surcharge will be acknowledged upon acceptance|Y
01|236389|13|4|of every order.|Y
01|236390|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236390|4|2|placed after September 1st 2025(until further notice).|Y
01|236390|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236390|4|4|of every order.|Y
01|236391|14|1|A tariff surcharge of 8% will be added to every order|Y
01|236391|14|2|placed after September 1st 2025(until further notice).|Y
01|236391|14|3|This surcharge will be acknowledged upon acceptance|Y
01|236391|14|4|of every order.|Y
01|236392|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236392|3|2|placed after September 1st 2025(until further notice).|Y
01|236392|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236392|3|4|of every order.|Y
01|236393|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236393|3|2|placed after September 1st 2025(until further notice).|Y
01|236393|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236393|3|4|of every order.|Y
01|236394|1|1|Tariff Code: 8466.10.0175 / Country of Origin Japan|Y
01|236394|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236394|2|2|placed after September 1st 2025(until further notice).|Y
01|236394|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236394|2|4|of every order.|Y
01|236395|2|1|Delivery: 1 pc 2 weeks 2 pcs 5-6 weeks.|Y
01|236395|2|2|*Quoted at NET price considered a special.|Y
01|236395|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236395|4|2|placed after September 1st 2025(until further notice).|Y
01|236395|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236395|4|4|of every order.|Y
01|236396|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236396|4|2|placed after September 1st 2025(until further notice).|Y
01|236396|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236396|4|4|of every order.|Y
01|236397|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236397|10|2|placed after September 1st 2025(until further notice).|Y
01|236397|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236397|10|4|of every order.|Y
01|236398|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236398|2|2|placed after September 1st 2025(until further notice).|Y
01|236398|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236398|2|4|of every order.|Y
01|236399|1|1|Tariff Code: 8466.10.0175 / Country of Origin Japan|Y
01|236399|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236399|2|2|placed after September 1st 2025(until further notice).|Y
01|236399|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236399|2|4|of every order.|Y
01|236400|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236400|10|2|placed after September 1st 2025(until further notice).|Y
01|236400|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236400|10|4|of every order.|Y
01|236401|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236401|5|2|placed after September 1st 2025(until further notice).|Y
01|236401|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236401|5|4|of every order.|Y
01|236402|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236402|3|2|placed after September 1st 2025(until further notice).|Y
01|236402|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236402|3|4|of every order.|Y
01|236403|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236403|3|2|placed after September 1st 2025(until further notice).|Y
01|236403|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236403|3|4|of every order.|Y
01|236404|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236404|5|2|placed after September 1st 2025(until further notice).|Y
01|236404|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236404|5|4|of every order.|Y
01|236405|12|1|A tariff surcharge of 8% will be added to every order|Y
01|236405|12|2|placed after September 1st 2025(until further notice).|Y
01|236405|12|3|This surcharge will be acknowledged upon acceptance|Y
01|236405|12|4|of every order.|Y
01|236406|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236406|4|2|placed after September 1st 2025(until further notice).|Y
01|236406|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236406|4|4|of every order.|Y
01|236407|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236407|7|2|placed after September 1st 2025(until further notice).|Y
01|236407|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236407|7|4|of every order.|Y
01|236408|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236408|2|2|placed after September 1st 2025(until further notice).|Y
01|236408|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236408|2|4|of every order.|Y
01|236409|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236409|3|2|placed after September 1st 2025(until further notice).|Y
01|236409|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236409|3|4|of every order.|Y
01|236410|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236410|2|2|placed after September 1st 2025(until further notice).|Y
01|236410|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236410|2|4|of every order.|Y
01|236411|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236411|7|2|placed after September 1st 2025(until further notice).|Y
01|236411|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236411|7|4|of every order.|Y
01|236412|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236412|7|2|placed after September 1st 2025(until further notice).|Y
01|236412|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236412|7|4|of every order.|Y
01|236413|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236413|2|2|placed after September 1st 2025(until further notice).|Y
01|236413|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236413|2|4|of every order.|Y
01|236414|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236414|3|2|placed after September 1st 2025(until further notice).|Y
01|236414|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236414|3|4|of every order.|Y
01|236415|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236415|7|2|placed after September 1st 2025(until further notice).|Y
01|236415|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236415|7|4|of every order.|Y
01|236416|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236416|2|2|placed after September 1st 2025(until further notice).|Y
01|236416|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236416|2|4|of every order.|Y
01|236417|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236417|2|2|placed after September 1st 2025(until further notice).|Y
01|236417|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236417|2|4|of every order.|Y
01|236419|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236419|3|2|placed after September 1st 2025(until further notice).|Y
01|236419|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236419|3|4|of every order.|Y
01|236420|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236420|2|2|placed after September 1st 2025(until further notice).|Y
01|236420|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236420|2|4|of every order.|Y
01|236421|1|1|RGA#LVR-62088/|Y
01|236421|1|2|Repair of MNZ20-SK16X-ICE-12K s/n: 20905017 20|Y
01|236421|1|3|(Mimatic#193568)|Y
01|236421|2|1|Bearings seals o-rings & damaged SK16 spindle to be|Y
01|236421|2|2|replaced. Rebuild to external coolant. Change ID plate|Y
01|236421|2|3|to 193569. External coolant version with the same s/n.|Y
01|236421|4|1|RGA#LVR-62088/|Y
01|236421|4|2|Repair of MNZ20-SK16X-ICE-12K s/n: 19903864 15|Y
01|236421|4|3|(Mimatic#193568)|Y
01|236421|5|1|Bearings seals o-rings & damaged SK16 spindle to be|Y
01|236421|5|2|replaced. Rebuild to external coolant. Change ID plate|Y
01|236421|5|3|to 193569. External coolant version with the same s/n.|Y
01|236421|7|1|RGA#LVR-62088/|Y
01|236421|7|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 20905241 10|Y
01|236421|7|3|(Mimatic#193643)|Y
01|236421|8|1|Bearings seals o-rings & damaged SK16 spindle to be|Y
01|236421|8|2|replaced. Rebuild to external coolant. Change ID plate|Y
01|236421|8|3|to 196235. External coolant version with the same s/n.|Y
01|236421|10|1|RGA#LVR-62088/|Y
01|236421|10|2|Repair of MNZ20-SK16Z-ICE-12K s/n: 20902426 03|Y
01|236421|10|3|(Mimatic#193643)|Y
01|236421|11|1|Bearings seals and o-rings to be replaced. Rebuid to|Y
01|236421|11|2|external coolant. Change ID plate to 196235. External|Y
01|236421|11|3|coolant version with the same s/n.|Y
01|236421|12|1|A tariff surcharge of 8% will be added to every order|Y
01|236421|12|2|placed after September 1st 2025(until further notice).|Y
01|236421|12|3|This surcharge will be acknowledged upon acceptance|Y
01|236421|12|4|of every order.|Y
01|236422|1|1|RGA#LVR-62161/|Y
01|236422|1|2|Repair of MZQT47-ER32X-OFF s/n: 81241 07|Y
01|236422|1|3|(Mimatic#124034)|Y
01|236422|2|1|Bearings seals and o-rings to be replaced.|Y
01|236422|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236422|3|2|placed after September 1st 2025(until further notice).|Y
01|236422|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236422|3|4|of every order.|Y
01|236423|1|1|RGA#LVR-62146/|Y
01|236423|1|2|Repair of MZQT47-ER32Z-ICE s/n: 23902561 01|Y
01|236423|1|3|(Mimatic#124873)|Y
01|236423|2|1|Realign/adjust tool to factory centerline|Y
01|236423|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236423|3|2|placed after September 1st 2025(until further notice).|Y
01|236423|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236423|3|4|of every order.|Y
01|236424|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|236425|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236425|2|2|placed after September 1st 2025(until further notice).|Y
01|236425|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236425|2|4|of every order.|Y
01|236426|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236426|2|2|placed after September 1st 2025(until further notice).|Y
01|236426|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236426|2|4|of every order.|Y
01|236427|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236427|2|2|placed after September 1st 2025(until further notice).|Y
01|236427|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236427|2|4|of every order.|Y
01|236429|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236429|2|2|placed after September 1st 2025(until further notice).|Y
01|236429|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236429|2|4|of every order.|Y
01|236430|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236430|2|2|placed after September 1st 2025(until further notice).|Y
01|236430|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236430|2|4|of every order.|Y
01|236431|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236431|2|2|placed after September 1st 2025(until further notice).|Y
01|236431|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236431|2|4|of every order.|Y
01|236432|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236432|2|2|placed after September 1st 2025(until further notice).|Y
01|236432|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236432|2|4|of every order.|Y
01|236433|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236433|2|2|placed after September 1st 2025(until further notice).|Y
01|236433|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236433|2|4|of every order.|Y
01|236435|29|1|A tariff surcharge of 8% will be added to every order|Y
01|236435|29|2|placed after September 1st 2025(until further notice).|Y
01|236435|29|3|This surcharge will be acknowledged upon acceptance|Y
01|236435|29|4|of every order.|Y
01|236436|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236436|2|2|placed after September 1st 2025(until further notice).|Y
01|236436|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236436|2|4|of every order.|Y
01|236437|11|1|A tariff surcharge of 8% will be added to every order|Y
01|236437|11|2|placed after September 1st 2025(until further notice).|Y
01|236437|11|3|This surcharge will be acknowledged upon acceptance|Y
01|236437|11|4|of every order.|Y
01|236438|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|236438|-13|2|placed after September 1st 2025(until further notice).|Y
01|236438|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|236438|-13|4|of every order.|Y
01|236439|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236439|2|2|placed after September 1st 2025(until further notice).|Y
01|236439|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236439|2|4|of every order.|Y
01|236440|1|1|Quoted at Net price 1 to 12 holders.|Y
01|236440|13|1|A tariff surcharge of 8% will be added to every order|Y
01|236440|13|2|placed after September 1st 2025(until further notice).|Y
01|236440|13|3|This surcharge will be acknowledged upon acceptance|Y
01|236440|13|4|of every order.|Y
01|236441|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236441|2|2|placed after September 1st 2025(until further notice).|Y
01|236441|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236441|2|4|of every order.|Y
01|236442|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236442|2|2|placed after September 1st 2025(until further notice).|Y
01|236442|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236442|2|4|of every order.|Y
01|236443|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236443|3|2|placed after September 1st 2025(until further notice).|Y
01|236443|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236443|3|4|of every order.|Y
01|236444|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236444|3|2|placed after September 1st 2025(until further notice).|Y
01|236444|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236444|3|4|of every order.|Y
01|236445|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236445|4|2|placed after September 1st 2025(until further notice).|Y
01|236445|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236445|4|4|of every order.|Y
01|236446|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236446|7|2|placed after September 1st 2025(until further notice).|Y
01|236446|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236446|7|4|of every order.|Y
01|236447|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236447|2|2|placed after September 1st 2025(until further notice).|Y
01|236447|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236447|2|4|of every order.|Y
01|236448|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236448|5|2|placed after September 1st 2025(until further notice).|Y
01|236448|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236448|5|4|of every order.|Y
01|236449|26|1|A tariff surcharge of 8% will be added to every order|Y
01|236449|26|2|placed after September 1st 2025(until further notice).|Y
01|236449|26|3|This surcharge will be acknowledged upon acceptance|Y
01|236449|26|4|of every order.|Y
01|236450|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236450|2|2|placed after September 1st 2025(until further notice).|Y
01|236450|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236450|2|4|of every order.|Y
01|236451|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236451|2|2|placed after September 1st 2025(until further notice).|Y
01|236451|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236451|2|4|of every order.|Y
01|236452|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236452|2|2|placed after September 1st 2025(until further notice).|Y
01|236452|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236452|2|4|of every order.|Y
01|236453|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236453|2|2|placed after September 1st 2025(until further notice).|Y
01|236453|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236453|2|4|of every order.|Y
01|236454|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236454|2|2|placed after September 1st 2025(until further notice).|Y
01|236454|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236454|2|4|of every order.|Y
01|236455|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236455|2|2|placed after September 1st 2025(until further notice).|Y
01|236455|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236455|2|4|of every order.|Y
01|236456|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236456|4|2|placed after September 1st 2025(until further notice).|Y
01|236456|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236456|4|4|of every order.|Y
01|236457|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236457|3|2|placed after September 1st 2025(until further notice).|Y
01|236457|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236457|3|4|of every order.|Y
01|236458|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236458|5|2|placed after September 1st 2025(until further notice).|Y
01|236458|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236458|5|4|of every order.|Y
01|236459|1|1|P/N: TBD|Y
01|236459|1|2|CAT50 taper; 45 deg angle head.|Y
01|236459|1|3|-Shaft CAT50; complete with machine specific-Torque-Arm|Y
01|236459|1|4|per ISO 924; and locking mechanism (without machine|Y
01|236459|1|5|specific stoppblock); adjustment by customer-side to|Y
01|236459|1|6|the machining center; A = 110(Lyndex Pin); tooling|Y
01|236459|1|7|interface for collet System ER16 OR ER20 according|Y
01|236459|1|8|DIN 6499; by agreement; internal coolant through the|Y
01|236459|1|9|spindle and external coolant over pipes; grade of|Y
01|236459|1|10|filtration: max. 0.05mm; reversal of rotation|Y
01|236459|2|1|continuation of description:|Y
01|236459|2|2|(Drive driection unequal output direction); L=app 215mm|Y
01|236459|2|3|gear ratio: i(n1/n2)=1:1; max torque: M(max) = 5Nm|Y
01|236459|2|4|max. coolant pressure: p(max) = 70 bar|Y
01|236459|2|5|max. ingoing revolution: n1(max)=8.000rpm: max outgoing|Y
01|236459|2|6|revolution: n2(max)= 8.000 rpm|Y
01|236459|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236459|3|2|placed after September 1st 2025(until further notice).|Y
01|236459|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236459|3|4|of every order.|Y
01|236460|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236460|2|2|placed after September 1st 2025(until further notice).|Y
01|236460|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236460|2|4|of every order.|Y
01|236461|1|1|Please Note: This retention knob is on the|Y
01|236461|1|2|Lyndex-Nikken Overstock list. Extra 20% added to the|Y
01|236461|1|3|discount. Item is non-returnable.|Y
01|236461|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236461|3|2|placed after September 1st 2025(until further notice).|Y
01|236461|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236461|3|4|of every order.|Y
01|236462|2|1|Includes dual axis drive short bar fiber optic cables|Y
01|236462|2|2|communications cables bulkhead cable external cables|Y
01|236462|2|3|parameter changes service time and travel.|Y
01|236462|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236462|3|2|placed after September 1st 2025(until further notice).|Y
01|236462|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236462|3|4|of every order.|Y
01|236463|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236463|2|2|placed after September 1st 2025(until further notice).|Y
01|236463|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236463|2|4|of every order.|Y
01|236464|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236464|9|2|placed after September 1st 2025(until further notice).|Y
01|236464|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236464|9|4|of every order.|Y
01|236465|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236465|3|2|placed after September 1st 2025(until further notice).|Y
01|236465|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236465|3|4|of every order.|Y
01|236466|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236466|7|2|placed after September 1st 2025(until further notice).|Y
01|236466|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236466|7|4|of every order.|Y
01|236467|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236467|5|2|placed after September 1st 2025(until further notice).|Y
01|236467|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236467|5|4|of every order.|Y
01|236468|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236468|2|2|placed after September 1st 2025(until further notice).|Y
01|236468|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236468|2|4|of every order.|Y
01|236470|40|1|A tariff surcharge of 8% will be added to every order|Y
01|236470|40|2|placed after September 1st 2025(until further notice).|Y
01|236470|40|3|This surcharge will be acknowledged upon acceptance|Y
01|236470|40|4|of every order.|Y
01|236471|3|1|BMT55-SK16X-ICE Mim#206623|Y
01|236471|4|1|BMT55-SK16Z-ICE  Mim#206624|Y
01|236471|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236471|5|2|placed after September 1st 2025(until further notice).|Y
01|236471|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236471|5|4|of every order.|Y
01|236471|9|1|BMT55-SK16X-ICE Mim#206623|Y
01|236471|10|1|BMT55-SK16Z-ICE  Mim#206624|Y
01|236472|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236472|7|2|placed after September 1st 2025(until further notice).|Y
01|236472|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236472|7|4|of every order.|Y
01|236473|20|1|A tariff surcharge of 8% will be added to every order|Y
01|236473|20|2|placed after September 1st 2025(until further notice).|Y
01|236473|20|3|This surcharge will be acknowledged upon acceptance|Y
01|236473|20|4|of every order.|Y
01|236474|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236474|4|2|placed after September 1st 2025(until further notice).|Y
01|236474|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236474|4|4|of every order.|Y
01|236475|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236475|2|2|placed after September 1st 2025(until further notice).|Y
01|236475|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236475|2|4|of every order.|Y
01|236476|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236476|9|2|placed after September 1st 2025(until further notice).|Y
01|236476|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236476|9|4|of every order.|Y
01|236477|2|1|ZeroClamp SP Clamping Base for Variaxis i800 Mazak|Y
01|236477|2|2|Base size 500mm x 500mm Pod ZP 120 x 5pcs.|Y
01|236477|2|3|SP Order Item. NET Price Each. Cancellations cannot be|Y
01|236477|2|4|accepted once the order has been received.|Y
01|236477|2|5|Delivery: 10 weeks Mfg + Shipping(Boat 6-8weeks)|Y
01|236477|2|6|Air freight is also available as an option. Please NOTE|Y
01|236477|2|7|that an additional Air freight cost will be applied.|Y
01|236477|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236477|6|2|placed after September 1st 2025(until further notice).|Y
01|236477|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236477|6|4|of every order.|Y
01|236478|2|1|ZeroClamp SP Clamping Base for Variaxis i800 Mazak|Y
01|236478|2|2|Base size 500mm x 500mm Pod ZP 120 x 6pcs.|Y
01|236478|2|3|SP Order Item. NET Price Each. Cancellations cannot be|Y
01|236478|2|4|accepted once the order has been received.|Y
01|236478|2|5|Delivery: 10 weeks Mfg + Shipping(Boat 6-8weeks)|Y
01|236478|2|6|Air freight is also available as an option. Please NOTE|Y
01|236478|2|7|that an additional Air freight cost will be applied.|Y
01|236478|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236478|6|2|placed after September 1st 2025(until further notice).|Y
01|236478|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236478|6|4|of every order.|Y
01|236479|9|1|10% off package!|Y
01|236479|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236479|10|2|placed after September 1st 2025(until further notice).|Y
01|236479|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236479|10|4|of every order.|Y
01|236479|10|5|PRICING INCLUDES SURCHARGE|N
01|236480|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236480|5|2|placed after September 1st 2025(until further notice).|Y
01|236480|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236480|5|4|of every order.|Y
01|236481|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236481|4|2|placed after September 1st 2025(until further notice).|Y
01|236481|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236481|4|4|of every order.|Y
01|236482|9|1|*In-stock gage length|Y
01|236482|10|1|*Option for 1/2 Milling Chuck|Y
01|236482|23|1|A tariff surcharge of 8% will be added to every order|Y
01|236482|23|2|placed after September 1st 2025(until further notice).|Y
01|236482|23|3|This surcharge will be acknowledged upon acceptance|Y
01|236482|23|4|of every order.|Y
01|236483|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236483|4|2|placed after September 1st 2025(until further notice).|Y
01|236483|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236483|4|4|of every order.|Y
01|236484|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236484|7|2|placed after September 1st 2025(until further notice).|Y
01|236484|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236484|7|4|of every order.|Y
01|236485|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236485|3|2|placed after September 1st 2025(until further notice).|Y
01|236485|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236485|3|4|of every order.|Y
01|236486|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236486|7|2|placed after September 1st 2025(until further notice).|Y
01|236486|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236486|7|4|of every order.|Y
01|236488|1|1|Part Number: TBD Drawing ID No. A195807|Y
01|236488|1|2|Delivery: Drawing: 6-8 Wks 12 Wks After Signed Drawing|Y
01|236488|1|3|Quantity Breaks: 1 pc: $17390 2 pcs: $12738/EA(LIST)|Y
01|236488|1|4|BMT65 ER25 Axial Working Tool w/ 1:2 Gear Ratio|Y
01|236488|1|5|Shank: BMT65 Drive Length: S1=112 Drive 2-Flat 10mm|Y
01|236488|1|6|Tooling Interface: ER25 External Coolant via pipe|Y
01|236488|1|7|continuous dry run possible. Direction of rotation|Y
01|236488|1|8|reversal output spin is reversal to input.|Y
01|236488|1|9|Central Offset V=50mm Gear Ratio: i(n1/n2)=1:2|Y
01|236488|1|10|Max Torque M(max out)=35Nm Max Revolution n1(max)=5750|Y
01|236488|3|1|Part Number: TBD Drawing ID No. A197428|Y
01|236488|3|2|Delivery: Drawing 6-8 Wks 12 Wks After Signed Drawing|Y
01|236488|3|3|Quantity Break: 1pc: $17600 2pcs: $12883/EA (LIST)|Y
01|236488|3|4|BMT65 ER25 Radial Working Tool w/ 1:2 Gear Ratio|Y
01|236488|3|5|Shank for BMT-Turret with D=65/S1=112|Y
01|236488|3|6|Drive Twoflat AF 10mm Tooling Interface for ER25|Y
01|236488|3|7|Reversal of Rotation (Drive direction unequal output|Y
01|236488|3|8|direction) L=72mm Gear Ratio: i(n1/n2)=1:2 Max.|Y
01|236488|3|9|Coolant Pressure: p(max)=70 Bar Max. Torque:|Y
01|236488|3|10|M(max)=25Nm n1(max)=6000rpm n2(max)=12000RPM|Y
01|236488|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236488|7|2|placed after September 1st 2025(until further notice).|Y
01|236488|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236488|7|4|of every order.|Y
01|236489|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236489|5|2|placed after September 1st 2025(until further notice).|Y
01|236489|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236489|5|4|of every order.|Y
01|236490|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236490|2|2|placed after September 1st 2025(until further notice).|Y
01|236490|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236490|2|4|of every order.|Y
01|236491|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236491|5|2|placed after September 1st 2025(until further notice).|Y
01|236491|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236491|5|4|of every order.|Y
01|236492|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236492|6|2|placed after September 1st 2025(until further notice).|Y
01|236492|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236492|6|4|of every order.|Y
01|236493|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236493|2|2|placed after September 1st 2025(until further notice).|Y
01|236493|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236493|2|4|of every order.|Y
01|236494|1|1|RGA#TOR-62134/|Y
01|236494|1|2|Repair of SF-START2-UNIT-200 s/n:2J7147|Y
01|236494|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236494|4|2|placed after September 1st 2025(until further notice).|Y
01|236494|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236494|4|4|of every order.|Y
01|236495|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236495|2|2|placed after September 1st 2025(until further notice).|Y
01|236495|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236495|2|4|of every order.|Y
01|236496|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236496|2|2|placed after September 1st 2025(until further notice).|Y
01|236496|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236496|2|4|of every order.|Y
01|236497|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236497|2|2|placed after September 1st 2025(until further notice).|Y
01|236497|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236497|2|4|of every order.|Y
01|236498|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236498|2|2|placed after September 1st 2025(until further notice).|Y
01|236498|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236498|2|4|of every order.|Y
01|236499|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236499|3|2|placed after September 1st 2025(until further notice).|Y
01|236499|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236499|3|4|of every order.|Y
01|236500|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236500|2|2|placed after September 1st 2025(until further notice).|Y
01|236500|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236500|2|4|of every order.|Y
01|236501|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236501|6|2|placed after September 1st 2025(until further notice).|Y
01|236501|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236501|6|4|of every order.|Y
01|236502|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236502|2|2|placed after September 1st 2025(until further notice).|Y
01|236502|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236502|2|4|of every order.|Y
01|236503|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236503|2|2|placed after September 1st 2025(until further notice).|Y
01|236503|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236503|2|4|of every order.|Y
01|236504|19|1|A tariff surcharge of 8% will be added to every order|Y
01|236504|19|2|placed after September 1st 2025(until further notice).|Y
01|236504|19|3|This surcharge will be acknowledged upon acceptance|Y
01|236504|19|4|of every order.|Y
01|236505|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236505|2|2|placed after September 1st 2025(until further notice).|Y
01|236505|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236505|2|4|of every order.|Y
01|236506|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236506|4|2|placed after September 1st 2025(until further notice).|Y
01|236506|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236506|4|4|of every order.|Y
01|236507|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236507|2|2|placed after September 1st 2025(until further notice).|Y
01|236507|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236507|2|4|of every order.|Y
01|236508|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236508|2|2|placed after September 1st 2025(until further notice).|Y
01|236508|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236508|2|4|of every order.|Y
01|236509|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236509|2|2|placed after September 1st 2025(until further notice).|Y
01|236509|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236509|2|4|of every order.|Y
01|236510|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236510|2|2|placed after September 1st 2025(until further notice).|Y
01|236510|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236510|2|4|of every order.|Y
01|236511|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236511|3|2|placed after September 1st 2025(until further notice).|Y
01|236511|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236511|3|4|of every order.|Y
01|236512|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236512|2|2|placed after September 1st 2025(until further notice).|Y
01|236512|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236512|2|4|of every order.|Y
01|236513|1|1|RGA#TOR-62154/|Y
01|236513|1|2|Repair of CAT50-MMC12C-135U-IDU|Y
01|236513|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236513|4|2|placed after September 1st 2025(until further notice).|Y
01|236513|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236513|4|4|of every order.|Y
01|236514|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236514|9|2|placed after September 1st 2025(until further notice).|Y
01|236514|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236514|9|4|of every order.|Y
01|236515|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236515|2|2|placed after September 1st 2025(until further notice).|Y
01|236515|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236515|2|4|of every order.|Y
01|236516|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236516|2|2|placed after September 1st 2025(until further notice).|Y
01|236516|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236516|2|4|of every order.|Y
01|236517|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236517|2|2|placed after September 1st 2025(until further notice).|Y
01|236517|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236517|2|4|of every order.|Y
01|236518|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236518|8|2|placed after September 1st 2025(until further notice).|Y
01|236518|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236518|8|4|of every order.|Y
01|236519|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236519|10|2|placed after September 1st 2025(until further notice).|Y
01|236519|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236519|10|4|of every order.|Y
01|236520|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236520|4|2|placed after September 1st 2025(until further notice).|Y
01|236520|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236520|4|4|of every order.|Y
01|236521|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236521|2|2|placed after September 1st 2025(until further notice).|Y
01|236521|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236521|2|4|of every order.|Y
01|236522|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|236522|-13|2|placed after September 1st 2025(until further notice).|Y
01|236522|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|236522|-13|4|of every order.|Y
01|236523|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236523|2|2|placed after September 1st 2025(until further notice).|Y
01|236523|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236523|2|4|of every order.|Y
01|236524|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236524|3|2|placed after September 1st 2025(until further notice).|Y
01|236524|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236524|3|4|of every order.|Y
01|236525|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236525|7|2|placed after September 1st 2025(until further notice).|Y
01|236525|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236525|7|4|of every order.|Y
01|236526|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236526|2|2|placed after September 1st 2025(until further notice).|Y
01|236526|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236526|2|4|of every order.|Y
01|236527|16|1|P/N: NC5007-0016-4.12SN|Y
01|236527|16|2|NCAT50 DualContact ER16 Collet Chuck-Solid Hex Nut|Y
01|236527|16|3|-Chip Hole|Y
01|236527|17|1|P/N: NC5007-0016-6.00SN|Y
01|236527|17|2|NCAT50 DualContact ER16 Collet Chuck - Solid Hex Nut|Y
01|236527|17|3|-Chip Hole|Y
01|236527|18|1|P/N: NC5007-0032-4.00SN|Y
01|236527|18|2|NCAT50 DualContact ER32 Collet Chuck -Solid Spanner Nut|Y
01|236527|18|3|-Chip Hole|Y
01|236527|19|1|P/N: NC5007-0032-6.00SN|Y
01|236527|19|2|NCAT50 DualContact ER32 Collet Chuck -Solid Spanner Nut|Y
01|236527|19|3|-Chip Hole|Y
01|236527|20|1|P/N: NC5007-0020-4.00SN|Y
01|236527|20|2|NCAT50 DualContact ER20 Collet Chuck - Solid Hex Nut|Y
01|236527|20|3|-Chip Hole|Y
01|236527|24|1|A tariff surcharge of 8% will be added to every order|Y
01|236527|24|2|placed after September 1st 2025(until further notice).|Y
01|236527|24|3|This surcharge will be acknowledged upon acceptance|Y
01|236527|24|4|of every order.|Y
01|236528|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236528|2|2|placed after September 1st 2025(until further notice).|Y
01|236528|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236528|2|4|of every order.|Y
01|236529|29|1|A tariff surcharge of 8% will be added to every order|Y
01|236529|29|2|placed after September 1st 2025(until further notice).|Y
01|236529|29|3|This surcharge will be acknowledged upon acceptance|Y
01|236529|29|4|of every order.|Y
01|236530|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236530|2|2|placed after September 1st 2025(until further notice).|Y
01|236530|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236530|2|4|of every order.|Y
01|236531|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236531|2|2|placed after September 1st 2025(until further notice).|Y
01|236531|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236531|2|4|of every order.|Y
01|236532|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236532|2|2|placed after September 1st 2025(until further notice).|Y
01|236532|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236532|2|4|of every order.|Y
01|236533|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236533|2|2|placed after September 1st 2025(until further notice).|Y
01|236533|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236533|2|4|of every order.|Y
01|236534|2|1|ST25M-SF16-120|Y
01|236534|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236534|4|2|placed after September 1st 2025(until further notice).|Y
01|236534|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236534|4|4|of every order.|Y
01|236535|11|1|A tariff surcharge of 8% will be added to every order|Y
01|236535|11|2|placed after September 1st 2025(until further notice).|Y
01|236535|11|3|This surcharge will be acknowledged upon acceptance|Y
01|236535|11|4|of every order.|Y
01|236536|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236536|2|2|placed after September 1st 2025(until further notice).|Y
01|236536|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236536|2|4|of every order.|Y
01|236537|15|1|A tariff surcharge of 8% will be added to every order|Y
01|236537|15|2|placed after September 1st 2025(until further notice).|Y
01|236537|15|3|This surcharge will be acknowledged upon acceptance|Y
01|236537|15|4|of every order.|Y
01|236538|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236538|7|2|placed after September 1st 2025(until further notice).|Y
01|236538|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236538|7|4|of every order.|Y
01|236539|27|1|A tariff surcharge of 8% will be added to every order|Y
01|236539|27|2|placed after September 1st 2025(until further notice).|Y
01|236539|27|3|This surcharge will be acknowledged upon acceptance|Y
01|236539|27|4|of every order.|Y
01|236540|1|1|P/N:  S.RCC-E70|Y
01|236540|2|1|P/N: S.RCC-53|Y
01|236540|3|1|P/N: S.RCC-43|Y
01|236540|4|1|P/N: S.RCC-53K|Y
01|236540|5|1|P/N: S.RCC-70K|Y
01|236540|6|1|P/N: CC12-C8(AC630M) 1 set = 10pcs|Y
01|236540|7|1|P/N: SC12-C8(AC630M)  1 set = 10pcs|Y
01|236540|8|1|P/N: SC12-C8(AC630M)|N
01|236541|1|1|9x22 Martin Trunnion- Includes|Y
01|236541|1|2|Trunnion porting for pneumatic Zero Point Vises|Y
01|236541|1|3|Includes Adapter from Nikken 6 Port Rotary Union to|Y
01|236541|1|4|Martin Trunnion System|Y
01|236541|1|5|Includes all airlines and air fittings|Y
01|236541|1|6|Shipping from Martin Trunnion - 6 to 8 weeks ARO|Y
01|236541|1|7|We can supply the drawings if Ferrous would like|Y
01|236541|1|8|to machine in house|Y
01|236541|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236541|4|2|placed after September 1st 2025(until further notice).|Y
01|236541|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236541|4|4|of every order.|Y
01|236542|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236542|2|2|placed after September 1st 2025(until further notice).|Y
01|236542|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236542|2|4|of every order.|Y
01|236543|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236543|2|2|placed after September 1st 2025(until further notice).|Y
01|236543|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236543|2|4|of every order.|Y
01|236544|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236544|2|2|placed after September 1st 2025(until further notice).|Y
01|236544|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236544|2|4|of every order.|Y
01|236545|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236545|3|2|placed after September 1st 2025(until further notice).|Y
01|236545|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236545|3|4|of every order.|Y
01|236546|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236546|3|2|placed after September 1st 2025(until further notice).|Y
01|236546|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236546|3|4|of every order.|Y
01|236547|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236547|2|2|placed after September 1st 2025(until further notice).|Y
01|236547|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236547|2|4|of every order.|Y
01|236548|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236548|3|2|placed after September 1st 2025(until further notice).|Y
01|236548|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236548|3|4|of every order.|Y
01|236549|16|1|A tariff surcharge of 8% will be added to every order|Y
01|236549|16|2|placed after September 1st 2025(until further notice).|Y
01|236549|16|3|This surcharge will be acknowledged upon acceptance|Y
01|236549|16|4|of every order.|Y
01|236550|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236550|2|2|placed after September 1st 2025(until further notice).|Y
01|236550|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236550|2|4|of every order.|Y
01|236551|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236551|3|2|placed after September 1st 2025(until further notice).|Y
01|236551|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236551|3|4|of every order.|Y
01|236552|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236552|4|2|placed after September 1st 2025(until further notice).|Y
01|236552|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236552|4|4|of every order.|Y
01|236553|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236553|2|2|placed after September 1st 2025(until further notice).|Y
01|236553|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236553|2|4|of every order.|Y
01|236554|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236554|5|2|placed after September 1st 2025(until further notice).|Y
01|236554|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236554|5|4|of every order.|Y
01|236555|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236555|4|2|placed after September 1st 2025(until further notice).|Y
01|236555|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236555|4|4|of every order.|Y
01|236556|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236556|3|2|placed after September 1st 2025(until further notice).|Y
01|236556|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236556|3|4|of every order.|Y
01|236557|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236557|2|2|placed after September 1st 2025(until further notice).|Y
01|236557|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236557|2|4|of every order.|Y
01|236558|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236558|3|2|placed after September 1st 2025(until further notice).|Y
01|236558|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236558|3|4|of every order.|Y
01|236559|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236559|5|2|placed after September 1st 2025(until further notice).|Y
01|236559|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236559|5|4|of every order.|Y
01|236560|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236560|2|2|placed after September 1st 2025(until further notice).|Y
01|236560|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236560|2|4|of every order.|Y
01|236561|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236561|2|2|placed after September 1st 2025(until further notice).|Y
01|236561|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236561|2|4|of every order.|Y
01|236562|2|1|Original amount $112 (list) x 0.08 = $8.96|Y
01|236562|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236562|3|2|placed after September 1st 2025(until further notice).|Y
01|236562|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236562|3|4|of every order.|Y
01|236563|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236563|3|2|placed after September 1st 2025(until further notice).|Y
01|236563|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236563|3|4|of every order.|Y
01|236564|2|1|Original amount $78.40 (Net)x 0.08 = $6.27|Y
01|236564|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236564|3|2|placed after September 1st 2025(until further notice).|Y
01|236564|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236564|3|4|of every order.|Y
01|236565|1|1|UPS Ground Shipping Quote - $19.03|Y
01|236565|1|2|SHIPPING NOT COVERED WITH TOOLING CERTIFICATE/VOUCHER.|Y
01|236565|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236565|5|2|placed after September 1st 2025(until further notice).|Y
01|236565|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236565|5|4|of every order.|Y
01|236566|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236566|2|2|placed after September 1st 2025(until further notice).|Y
01|236566|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236566|2|4|of every order.|Y
01|236567|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236567|6|2|placed after September 1st 2025(until further notice).|Y
01|236567|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236567|6|4|of every order.|Y
01|236568|1|1|CUSTOM 17-POT BASEPLATE|Y
01|236568|1|2|COVERS ENTIRE M560V MACHINE TABLE|Y
01|236568|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|236568|-13|2|placed after September 1st 2025(until further notice).|Y
01|236568|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|236568|-13|4|of every order.|Y
01|236569|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236569|3|2|placed after September 1st 2025(until further notice).|Y
01|236569|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236569|3|4|of every order.|Y
01|236570|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|236570|-13|2|placed after September 1st 2025(until further notice).|Y
01|236570|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|236570|-13|4|of every order.|Y
01|236571|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|236571|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236571|6|2|placed after September 1st 2025(until further notice).|Y
01|236571|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236571|6|4|of every order.|Y
01|236572|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236572|2|2|placed after September 1st 2025(until further notice).|Y
01|236572|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236572|2|4|of every order.|Y
01|236573|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236573|2|2|placed after September 1st 2025(until further notice).|Y
01|236573|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236573|2|4|of every order.|Y
01|236574|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|236574|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236574|5|2|placed after September 1st 2025(until further notice).|Y
01|236574|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236574|5|4|of every order.|Y
01|236575|1|1|Cat40 4 spindles ER164 X 24 mm without coolant supply|Y
01|236575|1|2|Max torque 4 nm per spindle n1 4000 rpm n2 8000 rpm|Y
01|236575|1|3|Transmision ratio (n1/n2)=1:2|Y
01|236575|1|4|Weight 5.7 kg|Y
01|236575|1|5|Net price for Hitec|Y
01|236575|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236575|4|2|placed after September 1st 2025(until further notice).|Y
01|236575|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236575|4|4|of every order.|Y
01|236576|2|1|FINISHING JAWS|Y
01|236576|3|1|ROUGHING JAWS|Y
01|236576|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236576|4|2|placed after September 1st 2025(until further notice).|Y
01|236576|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236576|4|4|of every order.|Y
01|236577|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236577|9|2|placed after September 1st 2025(until further notice).|Y
01|236577|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236577|9|4|of every order.|Y
01|236578|5|1|PRE-PART-12TRE|Y
01|236578|5|2|Includes: 2D Scanner 1000 Data matrix labels Software|Y
01|236578|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236578|7|2|placed after September 1st 2025(until further notice).|Y
01|236578|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236578|7|4|of every order.|Y
01|236579|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236579|3|2|placed after September 1st 2025(until further notice).|Y
01|236579|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236579|3|4|of every order.|Y
01|236580|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236580|10|2|placed after September 1st 2025(until further notice).|Y
01|236580|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236580|10|4|of every order.|Y
01|236581|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236581|2|2|placed after September 1st 2025(until further notice).|Y
01|236581|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236581|2|4|of every order.|Y
01|236582|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236582|2|2|placed after September 1st 2025(until further notice).|Y
01|236582|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236582|2|4|of every order.|Y
01|236583|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236583|2|2|placed after September 1st 2025(until further notice).|Y
01|236583|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236583|2|4|of every order.|Y
01|236584|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236584|3|2|placed after September 1st 2025(until further notice).|Y
01|236584|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236584|3|4|of every order.|Y
01|236585|1|1|**NET Price** - MOQ 10 pcs|Y
01|236585|1|2|SPECIAL - Cannot be cancelled or returned once a PO has|Y
01|236585|1|3|been received|Y
01|236585|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236585|2|2|placed after September 1st 2025(until further notice).|Y
01|236585|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236585|2|4|of every order.|Y
01|236586|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236586|2|2|placed after September 1st 2025(until further notice).|Y
01|236586|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236586|2|4|of every order.|Y
01|236587|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236587|3|2|placed after September 1st 2025(until further notice).|Y
01|236587|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236587|3|4|of every order.|Y
01|236588|5|1|NBT50-FMC22-105|Y
01|236588|5|2|NBT50 DualContact Shell Mill Holder 22mm Coolant Ports|Y
01|236588|6|1|NBT50-FMH22-47-105|Y
01|236588|6|2|NBT50 DualContact Shell Mill Holder 22mm Coolnatports|Y
01|236588|38|1|A tariff surcharge of 8% will be added to every order|Y
01|236588|38|2|placed after September 1st 2025(until further notice).|Y
01|236588|38|3|This surcharge will be acknowledged upon acceptance|Y
01|236588|38|4|of every order.|Y
01|236589|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236589|2|2|placed after September 1st 2025(until further notice).|Y
01|236589|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236589|2|4|of every order.|Y
01|236590|1|1|Currently three (3) in stock in IL balance of 17|Y
01|236590|1|2|lead time is approximately 1~2 weeks after receipt of|Y
01|236590|1|3|an order.|Y
01|236590|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236590|3|2|placed after September 1st 2025(until further notice).|Y
01|236590|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236590|3|4|of every order.|Y
01|236591|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236591|2|2|placed after September 1st 2025(until further notice).|Y
01|236591|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236591|2|4|of every order.|Y
01|236592|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236592|2|2|placed after September 1st 2025(until further notice).|Y
01|236592|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236592|2|4|of every order.|Y
01|236593|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236593|9|2|placed after September 1st 2025(until further notice).|Y
01|236593|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236593|9|4|of every order.|Y
01|236594|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236594|2|2|placed after September 1st 2025(until further notice).|Y
01|236594|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236594|2|4|of every order.|Y
01|236595|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236595|3|2|placed after September 1st 2025(until further notice).|Y
01|236595|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236595|3|4|of every order.|Y
01|236596|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236596|2|2|placed after September 1st 2025(until further notice).|Y
01|236596|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236596|2|4|of every order.|Y
01|236597|1|1|P/N: NBT50-FMA25.4-150|Y
01|236597|1|2|BT50 Dual Contact 25.4mm Face Mill Arbor with 5.90g.l.|Y
01|236597|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236597|8|2|placed after September 1st 2025(until further notice).|Y
01|236597|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236597|8|4|of every order.|Y
01|236598|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236598|3|2|placed after September 1st 2025(until further notice).|Y
01|236598|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236598|3|4|of every order.|Y
01|236599|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236599|2|2|placed after September 1st 2025(until further notice).|Y
01|236599|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236599|2|4|of every order.|Y
01|236600|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236600|2|2|placed after September 1st 2025(until further notice).|Y
01|236600|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236600|2|4|of every order.|Y
01|236601|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236601|3|2|placed after September 1st 2025(until further notice).|Y
01|236601|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236601|3|4|of every order.|Y
01|236602|5|1|Estimated Lead Time is end of October/early November.|N
01|236603|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236603|7|2|placed after September 1st 2025(until further notice).|Y
01|236603|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236603|7|4|of every order.|Y
01|236604|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236604|2|2|placed after September 1st 2025(until further notice).|Y
01|236604|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236604|2|4|of every order.|Y
01|236605|17|1|A tariff surcharge of 8% will be added to every order|Y
01|236605|17|2|placed after September 1st 2025(until further notice).|Y
01|236605|17|3|This surcharge will be acknowledged upon acceptance|Y
01|236605|17|4|of every order.|Y
01|236606|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236606|2|2|placed after September 1st 2025(until further notice).|Y
01|236606|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236606|2|4|of every order.|Y
01|236607|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236607|2|2|placed after September 1st 2025(until further notice).|Y
01|236607|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236607|2|4|of every order.|Y
01|236608|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236608|4|2|placed after September 1st 2025(until further notice).|Y
01|236608|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236608|4|4|of every order.|Y
01|236609|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236609|4|2|placed after September 1st 2025(until further notice).|Y
01|236609|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236609|4|4|of every order.|Y
01|236610|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236610|2|2|placed after September 1st 2025(until further notice).|Y
01|236610|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236610|2|4|of every order.|Y
01|236611|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236611|4|2|placed after September 1st 2025(until further notice).|Y
01|236611|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236611|4|4|of every order.|Y
01|236612|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236612|2|2|placed after September 1st 2025(until further notice).|Y
01|236612|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236612|2|4|of every order.|Y
01|236613|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236613|4|2|placed after September 1st 2025(until further notice).|Y
01|236613|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236613|4|4|of every order.|Y
01|236614|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236614|5|2|placed after September 1st 2025(until further notice).|Y
01|236614|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236614|5|4|of every order.|Y
01|236615|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236615|3|2|placed after September 1st 2025(until further notice).|Y
01|236615|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236615|3|4|of every order.|Y
01|236616|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236616|3|2|placed after September 1st 2025(until further notice).|Y
01|236616|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236616|3|4|of every order.|Y
01|236617|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236617|4|2|placed after September 1st 2025(until further notice).|Y
01|236617|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236617|4|4|of every order.|Y
01|236618|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236618|2|2|placed after September 1st 2025(until further notice).|Y
01|236618|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236618|2|4|of every order.|Y
01|236619|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236619|2|2|placed after September 1st 2025(until further notice).|Y
01|236619|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236619|2|4|of every order.|Y
01|236620|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236620|2|2|placed after September 1st 2025(until further notice).|Y
01|236620|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236620|2|4|of every order.|Y
01|236621|1|1|**Used Unit - Cannot be cancelled or returned upon|Y
01|236621|1|2|receipt of a PO**|Y
01|236621|1|3|* ONE TIME PRICING FOR USED DEMO UNIT ONLY*|Y
01|236621|2|1|A tariff surcharge may be added to this quotation in|Y
01|236621|2|2|the event of a sustained tariff increase on the|Y
01|236621|2|3|importation of this product.  Any surcharge will be|Y
01|236621|2|4|disclosed prior to acceptance of an order.|Y
01|236622|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236622|2|2|placed after September 1st 2025(until further notice).|Y
01|236622|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236622|2|4|of every order.|Y
01|236623|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236623|2|2|placed after September 1st 2025(until further notice).|Y
01|236623|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236623|2|4|of every order.|Y
01|236624|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236624|2|2|placed after September 1st 2025(until further notice).|Y
01|236624|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236624|2|4|of every order.|Y
01|236625|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236625|2|2|placed after September 1st 2025(until further notice).|Y
01|236625|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236625|2|4|of every order.|Y
01|236626|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236626|2|2|placed after September 1st 2025(until further notice).|Y
01|236626|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236626|2|4|of every order.|Y
01|236627|19|1|A tariff surcharge of 8% will be added to every order|Y
01|236627|19|2|placed after September 1st 2025(until further notice).|Y
01|236627|19|3|This surcharge will be acknowledged upon acceptance|Y
01|236627|19|4|of every order.|Y
01|236628|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236628|9|2|placed after September 1st 2025(until further notice).|Y
01|236628|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236628|9|4|of every order.|Y
01|236630|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236630|2|2|placed after September 1st 2025(until further notice).|Y
01|236630|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236630|2|4|of every order.|Y
01|236631|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236631|2|2|placed after September 1st 2025(until further notice).|Y
01|236631|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236631|2|4|of every order.|Y
01|236632|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236632|3|2|placed after September 1st 2025(until further notice).|Y
01|236632|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236632|3|4|of every order.|Y
01|236633|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236633|4|2|placed after September 1st 2025(until further notice).|Y
01|236633|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236633|4|4|of every order.|Y
01|236634|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236634|2|2|placed after September 1st 2025(until further notice).|Y
01|236634|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236634|2|4|of every order.|Y
01|236635|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236635|2|2|placed after September 1st 2025(until further notice).|Y
01|236635|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236635|2|4|of every order.|Y
01|236636|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236636|2|2|placed after September 1st 2025(until further notice).|Y
01|236636|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236636|2|4|of every order.|Y
01|236637|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236637|2|2|placed after September 1st 2025(until further notice).|Y
01|236637|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236637|2|4|of every order.|Y
01|236638|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236638|2|2|placed after September 1st 2025(until further notice).|Y
01|236638|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236638|2|4|of every order.|Y
01|236639|5|1|Please note additional 20% applied per overstock promo.|Y
01|236639|5|2|Once PO/order issued these cannot be cancelled or|Y
01|236639|5|3|returned. These will need to be requoted for price &|Y
01|236639|5|4|availability upon stock depletion.|Y
01|236639|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236639|8|2|placed after September 1st 2025(until further notice).|Y
01|236639|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236639|8|4|of every order.|Y
01|236640|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236640|3|2|placed after September 1st 2025(until further notice).|Y
01|236640|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236640|3|4|of every order.|Y
01|236641|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236641|3|2|placed after September 1st 2025(until further notice).|Y
01|236641|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236641|3|4|of every order.|Y
01|236642|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236642|2|2|placed after September 1st 2025(until further notice).|Y
01|236642|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236642|2|4|of every order.|Y
01|236643|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236643|2|2|placed after September 1st 2025(until further notice).|Y
01|236643|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236643|2|4|of every order.|Y
01|236644|59|1|A tariff surcharge of 8% will be added to every order|Y
01|236644|59|2|placed after September 1st 2025(until further notice).|Y
01|236644|59|3|This surcharge will be acknowledged upon acceptance|Y
01|236644|59|4|of every order.|Y
01|236645|58|1|A tariff surcharge of 8% will be added to every order|Y
01|236645|58|2|placed after September 1st 2025(until further notice)|Y
01|236645|58|3|This surcharge will be acknowledged upon acceptance|Y
01|236646|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236646|5|2|placed after September 1st 2025(until further notice).|Y
01|236646|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236646|5|4|of every order.|Y
01|236647|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236647|2|2|placed after September 1st 2025(until further notice).|Y
01|236647|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236647|2|4|of every order.|Y
01|236648|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236648|4|2|placed after September 1st 2025(until further notice).|Y
01|236648|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236648|4|4|of every order.|Y
01|236649|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236649|8|2|placed after September 1st 2025(until further notice).|Y
01|236649|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236649|8|4|of every order.|Y
01|236650|27|1|A tariff surcharge of 8% will be added to every order|Y
01|236650|27|2|placed after September 1st 2025(until further notice).|Y
01|236650|27|3|This surcharge will be acknowledged upon acceptance|Y
01|236650|27|4|of every order.|Y
01|236651|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236651|4|2|placed after September 1st 2025(until further notice).|Y
01|236651|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236651|4|4|of every order.|Y
01|236652|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236652|6|2|placed after September 1st 2025(until further notice).|Y
01|236652|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236652|6|4|of every order.|Y
01|236653|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236653|4|2|placed after September 1st 2025(until further notice).|Y
01|236653|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236653|4|4|of every order.|Y
01|236654|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236654|4|2|placed after September 1st 2025(until further notice).|Y
01|236654|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236654|4|4|of every order.|Y
01|236655|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236655|2|2|placed after September 1st 2025(until further notice).|Y
01|236655|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236655|2|4|of every order.|Y
01|236656|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236656|3|2|placed after September 1st 2025(until further notice).|Y
01|236656|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236656|3|4|of every order.|Y
01|236657|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236657|10|2|placed after September 1st 2025(until further notice).|Y
01|236657|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236657|10|4|of every order.|Y
01|236658|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236658|8|2|placed after September 1st 2025(until further notice).|Y
01|236658|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236658|8|4|of every order.|Y
01|236659|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236659|10|2|placed after September 1st 2025(until further notice).|Y
01|236659|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236659|10|4|of every order.|Y
01|236660|1|1|Special Item - Cannot be cancelled or returned upon|Y
01|236660|1|2|receipt of PO|Y
01|236660|2|1|Discontinued Item - Cannot be cancelled or returned|Y
01|236660|2|2|upon receipt of PO|Y
01|236660|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236660|3|2|placed after September 1st 2025(until further notice).|Y
01|236660|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236660|3|4|of every order.|Y
01|236661|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236661|2|2|placed after September 1st 2025(until further notice).|Y
01|236661|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236661|2|4|of every order.|Y
01|236662|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236662|10|2|placed after September 1st 2025(until further notice).|Y
01|236662|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236662|10|4|of every order.|Y
01|236663|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236663|6|2|placed after September 1st 2025(until further notice).|Y
01|236663|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236663|6|4|of every order.|Y
01|236664|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236664|7|2|placed after September 1st 2025(until further notice).|Y
01|236664|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236664|7|4|of every order.|Y
01|236665|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236665|3|2|placed after September 1st 2025(until further notice).|Y
01|236665|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236665|3|4|of every order.|Y
01|236666|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236666|4|2|placed after September 1st 2025(until further notice).|Y
01|236666|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236666|4|4|of every order.|Y
01|236667|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236667|8|2|placed after September 1st 2025(until further notice).|Y
01|236667|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236667|8|4|of every order.|Y
01|236668|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236668|8|2|placed after September 1st 2025(until further notice).|Y
01|236668|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236668|8|4|of every order.|Y
01|236669|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236669|2|2|placed after September 1st 2025(until further notice).|Y
01|236669|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236669|2|4|of every order.|Y
01|236670|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236670|2|2|placed after September 1st 2025(until further notice).|Y
01|236670|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236670|2|4|of every order.|Y
01|236671|2|1|Lyndex-Nikken to make positioning block upon receipt of|Y
01|236671|2|2|spindle drawing.|Y
01|236671|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236671|6|2|placed after September 1st 2025(until further notice).|Y
01|236671|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236671|6|4|of every order.|Y
01|236672|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236672|4|2|placed after September 1st 2025(until further notice).|Y
01|236672|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236672|4|4|of every order.|Y
01|236673|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|236674|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236674|4|2|placed after September 1st 2025(until further notice).|Y
01|236674|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236674|4|4|of every order.|Y
01|236675|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236675|2|2|placed after September 1st 2025(until further notice).|Y
01|236675|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236675|2|4|of every order.|Y
01|236676|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236676|2|2|placed after September 1st 2025(until further notice).|Y
01|236676|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236676|2|4|of every order.|Y
01|236677|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236677|2|2|placed after September 1st 2025(until further notice).|Y
01|236677|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236677|2|4|of every order.|Y
01|236678|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236678|2|2|placed after September 1st 2025(until further notice).|Y
01|236678|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236678|2|4|of every order.|Y
01|236679|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236679|2|2|placed after September 1st 2025(until further notice).|Y
01|236679|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236679|2|4|of every order.|Y
01|236680|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236680|2|2|placed after September 1st 2025(until further notice).|Y
01|236680|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236680|2|4|of every order.|Y
01|236681|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236681|2|2|placed after September 1st 2025(until further notice).|Y
01|236681|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236681|2|4|of every order.|Y
01|236682|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236682|2|2|placed after September 1st 2025(until further notice).|Y
01|236682|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236682|2|4|of every order.|Y
01|236684|1|1|Lead time 6mos MFG + Shiiping(Boat)1.5-2mos|Y
01|236684|2|1|Scale Mount Kit Included.|Y
01|236684|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236684|4|2|placed after September 1st 2025(until further notice).|Y
01|236684|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236684|4|4|of every order.|Y
01|236685|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236685|7|2|placed after September 1st 2025(until further notice).|Y
01|236685|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236685|7|4|of every order.|Y
01|236686|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236686|3|2|placed after September 1st 2025(until further notice).|Y
01|236686|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236686|3|4|of every order.|Y
01|236687|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236687|2|2|placed after September 1st 2025(until further notice).|Y
01|236687|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236687|2|4|of every order.|Y
01|236688|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236688|5|2|placed after September 1st 2025(until further notice).|Y
01|236688|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236688|5|4|of every order.|Y
01|236689|35|1|A tariff surcharge of 8% will be added to every order|Y
01|236689|35|2|placed after September 1st 2025(until further notice).|Y
01|236689|35|3|This surcharge will be acknowledged upon acceptance|Y
01|236689|35|4|of every order.|Y
01|236690|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236690|3|2|placed after September 1st 2025(until further notice).|Y
01|236690|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236690|3|4|of every order.|Y
01|236691|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236691|2|2|placed after September 1st 2025(until further notice).|Y
01|236691|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236691|2|4|of every order.|Y
01|236692|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236692|2|2|placed after September 1st 2025(until further notice).|Y
01|236692|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236692|2|4|of every order.|Y
01|236694|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236694|4|2|placed after September 1st 2025(until further notice).|Y
01|236694|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236694|4|4|of every order.|Y
01|236695|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236695|2|2|placed after September 1st 2025(until further notice).|Y
01|236695|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236695|2|4|of every order.|Y
01|236696|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236696|2|2|placed after September 1st 2025(until further notice).|Y
01|236696|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236696|2|4|of every order.|Y
01|236697|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236697|2|2|placed after September 1st 2025(until further notice).|Y
01|236697|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236697|2|4|of every order.|Y
01|236698|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236698|10|2|placed after September 1st 2025(until further notice).|Y
01|236698|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236698|10|4|of every order.|Y
01|236699|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236699|3|2|placed after September 1st 2025(until further notice).|Y
01|236699|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236699|3|4|of every order.|Y
01|236700|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236700|2|2|placed after September 1st 2025(until further notice).|Y
01|236700|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236700|2|4|of every order.|Y
01|236702|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236702|2|2|placed after September 1st 2025(until further notice).|Y
01|236702|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236702|2|4|of every order.|Y
01|236703|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236703|2|2|placed after September 1st 2025(until further notice).|Y
01|236703|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236703|2|4|of every order.|Y
01|236704|1|1|Quoted 1~5 holders.|Y
01|236704|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236704|2|2|placed after September 1st 2025(until further notice).|Y
01|236704|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236704|2|4|of every order.|Y
01|236705|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236705|2|2|placed after September 1st 2025(until further notice).|Y
01|236705|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236705|2|4|of every order.|Y
01|236706|2|1|CUSTOMER POSITIONING BLOCK FOR CAT40 MACHINE|Y
01|236706|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236706|3|2|placed after September 1st 2025(until further notice).|Y
01|236706|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236706|3|4|of every order.|Y
01|236707|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236707|10|2|placed after September 1st 2025(until further notice).|Y
01|236707|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236707|10|4|of every order.|Y
01|236708|2|1|Please Note: @ wrenches are needed for this tool.|Y
01|236708|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236708|3|2|placed after September 1st 2025(until further notice).|Y
01|236708|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236708|3|4|of every order.|Y
01|236709|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236709|7|2|placed after September 1st 2025(until further notice).|Y
01|236709|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236709|7|4|of every order.|Y
01|236710|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236710|6|2|placed after September 1st 2025(until further notice).|Y
01|236710|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236710|6|4|of every order.|Y
01|236711|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236711|3|2|placed after September 1st 2025(until further notice).|Y
01|236711|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236711|3|4|of every order.|Y
01|236712|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236712|2|2|placed after September 1st 2025(until further notice).|Y
01|236712|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236712|2|4|of every order.|Y
01|236713|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236713|2|2|placed after September 1st 2025(until further notice).|Y
01|236713|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236713|2|4|of every order.|Y
01|236714|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236714|2|2|placed after September 1st 2025(until further notice).|Y
01|236714|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236714|2|4|of every order.|Y
01|236715|1|1|Installed w/ PS-123-AIR at factory|Y
01|236715|2|1|Installed on NC5-46-C12-55 at factory|Y
01|236715|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236715|4|2|placed after September 1st 2025(until further notice).|Y
01|236715|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236715|4|4|of every order.|Y
01|236716|1|1|Installed w/ PS-123-AIR at factory|Y
01|236716|2|1|Installed on PS-123-AIR at factory|Y
01|236716|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236716|4|2|placed after September 1st 2025(until further notice).|Y
01|236716|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236716|4|4|of every order.|Y
01|236717|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236717|2|2|placed after September 1st 2025(until further notice).|Y
01|236717|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236717|2|4|of every order.|Y
01|236718|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236718|3|2|placed after September 1st 2025(until further notice).|Y
01|236718|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236718|3|4|of every order.|Y
01|236719|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236719|5|2|placed after September 1st 2025(until further notice).|Y
01|236719|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236719|5|4|of every order.|Y
01|236720|12|1|A tariff surcharge of 8% will be added to every order|Y
01|236720|12|2|placed after September 1st 2025(until further notice).|Y
01|236720|12|3|This surcharge will be acknowledged upon acceptance|Y
01|236720|12|4|of every order.|Y
01|236721|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236721|2|2|placed after September 1st 2025(until further notice).|Y
01|236721|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236721|2|4|of every order.|Y
01|236722|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236722|2|2|placed after September 1st 2025(until further notice).|Y
01|236722|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236722|2|4|of every order.|Y
01|236723|1|1|Part Number: TBD Mimatic# A124490|Y
01|236723|1|2|Delivery:|Y
01|236723|1|3|Drawing: 6-8 Weeks 10-13 Weeks ADA (After Signed Dwg)|Y
01|236723|1|4|Shank for BMT-Style Turret with D=40mm Two flats with|Y
01|236723|1|5|8mm Tooling interface for ER25 collet system External|Y
01|236723|1|6|Coolant thru pipe only No reversal of rotation|Y
01|236723|1|7|direction. L1=100mm Gear ratio: i(n1/n2)=1:1 Max.|Y
01|236723|1|8|coolant pressure p(max) = 70 bar Max torque|Y
01|236723|1|9|M(max)=25Nm Max revolution n1(max)=6500rpm|Y
01|236723|1|10|n2(max)=6500rpm|Y
01|236723|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236723|3|2|placed after September 1st 2025(until further notice).|Y
01|236723|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236723|3|4|of every order.|Y
01|236724|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236724|5|2|placed after September 1st 2025(until further notice).|Y
01|236724|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236724|5|4|of every order.|Y
01|236725|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236725|3|2|placed after September 1st 2025(until further notice).|Y
01|236725|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236725|3|4|of every order.|Y
01|236726|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236726|2|2|placed after September 1st 2025(until further notice).|Y
01|236726|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236726|2|4|of every order.|Y
01|236727|2|1|26-RAC70-70E|Y
01|236727|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236727|3|2|placed after September 1st 2025(until further notice).|Y
01|236727|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236727|3|4|of every order.|Y
01|236728|1|1|NBT40-SK10C-90-RPNJ|Y
01|236728|1|2|NBT40 DualContact Slim Chuck SK10 15K Nano Coolant|Y
01|236728|8|1|A tariff surcharge may be added to this quotation in|Y
01|236728|8|2|the event of a sustained tariff increase on the|Y
01|236728|8|3|importation of this product.  Any surcharge will be|Y
01|236728|8|4|disclosed prior to acceptance of an order.|Y
01|236729|1|1|HSK63A-SK10C-90-RPNJ|Y
01|236729|1|2|HSK63 DualContact Slim Chuck SK10 15K Nano Coolant|Y
01|236729|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236729|9|2|placed after September 1st 2025(until further notice).|Y
01|236729|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236729|9|4|of every order.|Y
01|236730|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236730|10|2|placed after September 1st 2025(until further notice).|Y
01|236730|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236730|10|4|of every order.|Y
01|236730|11|1|When the installation service package is selected the|Y
01|236730|11|2|external cables are included in the package price.|Y
01|236731|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236731|3|2|placed after September 1st 2025(until further notice).|Y
01|236731|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236731|3|4|of every order.|Y
01|236732|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236732|3|2|placed after September 1st 2025(until further notice).|Y
01|236732|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236732|3|4|of every order.|Y
01|236733|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236733|2|2|placed after September 1st 2025(until further notice).|Y
01|236733|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236733|2|4|of every order.|Y
01|236734|4|1|Support table with brake system|Y
01|236734|5|1|Support table without brake system|Y
01|236734|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236734|6|2|placed after September 1st 2025(until further notice).|Y
01|236734|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236734|6|4|of every order.|Y
01|236735|1|1|Please allow 12 weeks for manufacturing & delivery|Y
01|236735|1|2|time upon receival of signed approval drawing. These|Y
01|236735|1|3|are considered special and have been quoted at special|Y
01|236735|1|4|net price. Once PO/order issued these cannot be|Y
01|236735|1|5|cancelled or returned.|Y
01|236735|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236735|3|2|placed after September 1st 2025(until further notice).|Y
01|236735|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236735|3|4|of every order.|Y
01|236736|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236736|2|2|placed after September 1st 2025(until further notice).|Y
01|236736|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236736|2|4|of every order.|Y
01|236737|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236737|2|2|placed after September 1st 2025(until further notice).|Y
01|236737|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236737|2|4|of every order.|Y
01|236738|2|1|Non-Returnable|Y
01|236738|4|1|Non-Returnable|Y
01|236738|6|1|Non-Returnable|Y
01|236738|7|1|Non-Returnable|Y
01|236738|8|1|Non-Returnable|Y
01|236738|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236738|9|2|placed after September 1st 2025(until further notice).|Y
01|236738|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236738|9|4|of every order.|Y
01|236738|11|1|KM32-1/16  Straight Collet/Sleeve OD 32mm ID 1/16|Y
01|236738|12|1|KM32-2  Straight Collet/Sleeve OD 32mm ID 2mm|Y
01|236739|1|1|P/N: CAT50-C1F-135UG-IDU-M|Y
01|236739|1|2|CAT50 Milling Chuck 1 Hi-Speed ChipHole w DIN Mod|Y
01|236739|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236739|2|2|placed after September 1st 2025(until further notice).|Y
01|236739|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236739|2|4|of every order.|Y
01|236740|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236740|3|2|placed after September 1st 2025(until further notice).|Y
01|236740|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236740|3|4|of every order.|Y
01|236741|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236741|3|2|placed after September 1st 2025(until further notice).|Y
01|236741|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236741|3|4|of every order.|Y
01|236742|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236742|4|2|placed after September 1st 2025(until further notice).|Y
01|236742|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236742|4|4|of every order.|Y
01|236743|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236743|4|2|placed after September 1st 2025(until further notice).|Y
01|236743|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236743|4|4|of every order.|Y
01|236744|12|1|A tariff surcharge of 8% will be added to every order|Y
01|236744|12|2|placed after September 1st 2025(until further notice).|Y
01|236744|12|3|This surcharge will be acknowledged upon acceptance|Y
01|236744|12|4|of every order.|Y
01|236746|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236746|2|2|placed after September 1st 2025(until further notice).|Y
01|236746|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236746|2|4|of every order.|Y
01|236747|16|1|A tariff surcharge of 8% will be added to every order|Y
01|236747|16|2|placed after September 1st 2025(until further notice).|Y
01|236747|16|3|This surcharge will be acknowledged upon acceptance|Y
01|236747|16|4|of every order.|Y
01|236748|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236748|6|2|placed after September 1st 2025(until further notice).|Y
01|236748|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236748|6|4|of every order.|Y
01|236749|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236749|4|2|placed after September 1st 2025(until further notice).|Y
01|236749|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236749|4|4|of every order.|Y
01|236750|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236750|3|2|placed after September 1st 2025(until further notice).|Y
01|236750|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236750|3|4|of every order.|Y
01|236751|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236751|3|2|placed after September 1st 2025(until further notice).|Y
01|236751|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236751|3|4|of every order.|Y
01|236752|1|1|Please note these are considered special. Once PO/order|Y
01|236752|1|2|has been issued these cannot be cancelled or returned.|Y
01|236752|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236752|2|2|placed after September 1st 2025(until further notice).|Y
01|236752|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236752|2|4|of every order.|Y
01|236753|2|1|Non-Returnable|Y
01|236753|4|1|Non-Returnable|Y
01|236753|6|1|Non-Returnable|Y
01|236753|7|1|Non-Returnable|Y
01|236753|8|1|Non-Returnable|Y
01|236753|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236753|9|2|placed after September 1st 2025(until further notice).|Y
01|236753|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236753|9|4|of every order.|Y
01|236754|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236754|2|2|placed after September 1st 2025(until further notice).|Y
01|236754|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236754|2|4|of every order.|Y
01|236755|1|1|Part Number: TBD|Y
01|236755|1|2|NCAT40 Shell Mill Holder 3/4 CoolantPorts 1.4 pocket|Y
01|236755|1|3|clearance.|Y
01|236755|1|4|*Lead time given as ADA - After Signed Drawing Approval|Y
01|236755|1|5|It may take 1-2 weeks for approval drawing to be made.|Y
01|236755|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236755|2|2|placed after September 1st 2025(until further notice).|Y
01|236755|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236755|2|4|of every order.|Y
01|236756|2|1|Non-Returnable|Y
01|236756|4|1|Non-Returnable|Y
01|236756|6|1|Non-Returnable|Y
01|236756|7|1|Non-Returnable|Y
01|236756|8|1|Non-Returnable|Y
01|236756|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236756|9|2|placed after September 1st 2025(until further notice).|Y
01|236756|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236756|9|4|of every order.|Y
01|236757|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236757|2|2|placed after September 1st 2025(until further notice).|Y
01|236757|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236757|2|4|of every order.|Y
01|236758|11|1|A tariff surcharge of 8% will be added to every order|Y
01|236758|11|2|placed after September 1st 2025(until further notice).|Y
01|236758|11|3|This surcharge will be acknowledged upon acceptance|Y
01|236758|11|4|of every order.|Y
01|236759|1|1|Estimated lead time is 3~4 weeks after the receipt of|Y
01|236759|1|2|an order.|Y
01|236759|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236759|7|2|placed after September 1st 2025(until further notice).|Y
01|236759|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236759|7|4|of every order.|Y
01|236760|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236760|2|2|placed after September 1st 2025(until further notice).|Y
01|236760|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236760|2|4|of every order.|Y
01|236761|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236761|10|2|placed after September 1st 2025(until further notice).|Y
01|236761|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236761|10|4|of every order.|Y
01|236762|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236762|2|2|placed after September 1st 2025(until further notice).|Y
01|236762|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236762|2|4|of every order.|Y
01|236763|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236763|7|2|placed after September 1st 2025(until further notice).|Y
01|236763|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236763|7|4|of every order.|Y
01|236764|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236764|2|2|placed after September 1st 2025(until further notice).|Y
01|236764|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236764|2|4|of every order.|Y
01|236765|2|1|Non-Returnable|Y
01|236765|4|1|Non-Returnable|Y
01|236765|6|1|Non-Returnable|Y
01|236765|7|1|Non-Returnable|Y
01|236765|8|1|Non-Returnable|Y
01|236765|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236765|9|2|placed after September 1st 2025(until further notice).|Y
01|236765|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236765|9|4|of every order.|Y
01|236766|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236766|3|2|placed after September 1st 2025(until further notice).|Y
01|236766|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236766|3|4|of every order.|Y
01|236767|16|1|A tariff surcharge of 8% will be added to every order|Y
01|236767|16|2|placed after September 1st 2025(until further notice).|Y
01|236767|16|3|This surcharge will be acknowledged upon acceptance|Y
01|236767|16|4|of every order.|Y
01|236768|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236768|2|2|placed after September 1st 2025(until further notice).|Y
01|236768|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236768|2|4|of every order.|Y
01|236769|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236769|3|2|placed after September 1st 2025(until further notice).|Y
01|236769|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236769|3|4|of every order.|Y
01|236770|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236770|2|2|placed after September 1st 2025(until further notice).|Y
01|236770|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236770|2|4|of every order.|Y
01|236771|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236771|6|2|placed after September 1st 2025(until further notice).|Y
01|236771|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236771|6|4|of every order.|Y
01|236772|2|1|1 STOCK + 2 WEEKS ON REMAINING|Y
01|236772|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236772|4|2|placed after September 1st 2025(until further notice).|Y
01|236772|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236772|4|4|of every order.|Y
01|236773|16|1|A tariff surcharge of 8% will be added to every order|Y
01|236773|16|2|placed after September 1st 2025(until further notice).|Y
01|236773|16|3|This surcharge will be acknowledged upon acceptance|Y
01|236773|16|4|of every order.|Y
01|236774|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236774|7|2|placed after September 1st 2025(until further notice).|Y
01|236774|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236774|7|4|of every order.|Y
01|236776|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236776|2|2|placed after September 1st 2025(until further notice).|Y
01|236776|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236776|2|4|of every order.|Y
01|236777|1|1|RGA#LVR-61991/|Y
01|236777|1|2|Repair of MNL12-ER32Z-MS-10K s/n:A0017*|Y
01|236777|1|3|(Alps#MSA01-3W000S)|Y
01|236777|2|1|For an overhaul with upgrade to new seal|Y
01|236777|4|1|Repair of MNL12-ER32Z-MS-10K s/n:A0018*|Y
01|236777|4|2|(Alps#MSA01-3W000S)|Y
01|236777|5|1|For an overhaul with upgrade to new seal|Y
01|236777|7|1|Repair of MNL12-ER32Z-MS-10K s/n:A0032*|Y
01|236777|7|2|(Alps#MSA01-3W000S)|Y
01|236777|8|1|For an overhaul with upgrade to new seal|Y
01|236777|12|1|A tariff surcharge of 8% will be added to every order|Y
01|236777|12|2|placed after September 1st 2025(until further notice).|Y
01|236777|12|3|This surcharge will be acknowledged upon acceptance|Y
01|236777|12|4|of every order.|Y
01|236778|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236778|2|2|placed after September 1st 2025(until further notice).|Y
01|236778|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236778|2|4|of every order.|Y
01|236779|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236779|3|2|placed after September 1st 2025(until further notice).|Y
01|236779|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236779|3|4|of every order.|Y
01|236780|18|1|A tariff surcharge of 8% will be added to every order|Y
01|236780|18|2|placed after September 1st 2025(until further notice).|Y
01|236780|18|3|This surcharge will be acknowledged upon acceptance|Y
01|236780|18|4|of every order.|Y
01|236781|1|1|TNKQ2508-0487 0013 - please note this is considered|Y
01|236781|1|2|special and once PO/order issued these cannot be|Y
01|236781|1|3|cancelled or returned.|Y
01|236781|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236781|2|2|placed after September 1st 2025(until further notice).|Y
01|236781|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236781|2|4|of every order.|Y
01|236782|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236782|3|2|placed after September 1st 2025(until further notice).|Y
01|236782|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236782|3|4|of every order.|Y
01|236783|15|1|A tariff surcharge of 8% will be added to every order|Y
01|236783|15|2|placed after September 1st 2025(until further notice).|Y
01|236783|15|3|This surcharge will be acknowledged upon acceptance|Y
01|236783|15|4|of every order.|Y
01|236784|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236784|2|2|placed after September 1st 2025(until further notice).|Y
01|236784|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236784|2|4|of every order.|Y
01|236785|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236785|6|2|placed after September 1st 2025(until further notice).|Y
01|236785|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236785|6|4|of every order.|Y
01|236786|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236786|2|2|placed after September 1st 2025(until further notice).|Y
01|236786|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236786|2|4|of every order.|Y
01|236787|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236787|2|2|placed after September 1st 2025(until further notice).|Y
01|236787|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236787|2|4|of every order.|Y
01|236788|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236788|3|2|placed after September 1st 2025(until further notice).|Y
01|236788|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236788|3|4|of every order.|Y
01|236789|1|1|5AX-250HFA-M-CT50|Y
01|236789|1|2|CAT50 HYDRAULIC ACTUATING CENTER POT|Y
01|236789|1|3|REQUIRES 3 CIRCUIT HYDRAULIC POWER UNIT|Y
01|236789|1|4|REQUIRES SPARE M-CODE SET TO SUPPORT TABLE CLAMPING|Y
01|236789|1|5|RECOMMEND INTERLOCKING CYCLE START WITH CLAMP...|Y
01|236789|1|6|CONFIRMATION SWITCH. DISCUSS WITH DMG ENGINEERING|Y
01|236789|1|7|RECOMMEND COLUMN RISER OPTION|Y
01|236789|1|8|REQUIRE FANUC DATA SHEETS.|Y
01|236789|1|9|QUOTED FOR NVX5100 W/ FANUC CONTROL|Y
01|236789|2|1|LEAD TIME 12-18W FROM SIGNED O.A.|Y
01|236789|2|2|ENGINEERING REVIEW REQUIRED|Y
01|236789|3|1|INVERTER PUMP W/ CIRCUIT BREAKER MOTOR STARTER KIT|Y
01|236789|3|2|INTERLOCKED TO E-STOP.|Y
01|236789|3|3|3 CLOSED CENTER SOLENOID A/B VALVE|Y
01|236789|3|4|4 PRESSURE SWITCHES; TILT ROTARY AND POT CLAMP/UNCLAM|Y
01|236789|4|1|TABLE LANDED COST 18961.83 X1.08(TARRIF)+$3500 RISER|N
01|236789|4|2|/GP72.5 (87195.00)|N
01|236789|4|3|H:\Table Info\1a   RT Project\5AX-250\SN 1573 5AX-250M|N
01|236789|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236789|6|2|placed after September 1st 2025(until further notice).|Y
01|236789|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236789|6|4|of every order.|Y
01|236790|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236790|2|2|placed after September 1st 2025(until further notice).|Y
01|236790|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236790|2|4|of every order.|Y
01|236791|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236791|5|2|placed after September 1st 2025(until further notice).|Y
01|236791|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236791|5|4|of every order.|Y
01|236792|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236792|2|2|placed after September 1st 2025(until further notice).|Y
01|236792|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236792|2|4|of every order.|Y
01|236793|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236793|4|2|placed after September 1st 2025(until further notice).|Y
01|236793|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236793|4|4|of every order.|Y
01|236794|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236794|3|2|placed after September 1st 2025(until further notice).|Y
01|236794|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236794|3|4|of every order.|Y
01|236795|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236795|10|2|placed after September 1st 2025(until further notice).|Y
01|236795|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236795|10|4|of every order.|Y
01|236796|1|1|Quoted at NET price Minimum Order quantity is|Y
01|236796|1|2|3-holders.|Y
01|236796|2|1|Delivery 12~13 Weeks ARO|Y
01|236796|12|1|A tariff surcharge of 8% will be added to every order|Y
01|236796|12|2|placed after September 1st 2025(until further notice).|Y
01|236796|12|3|This surcharge will be acknowledged upon acceptance|Y
01|236796|12|4|of every order.|Y
01|236797|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236797|5|2|placed after September 1st 2025(until further notice).|Y
01|236797|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236797|5|4|of every order.|Y
01|236798|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236798|3|2|placed after September 1st 2025(until further notice).|Y
01|236798|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236798|3|4|of every order.|Y
01|236799|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236799|2|2|placed after September 1st 2025(until further notice).|Y
01|236799|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236799|2|4|of every order.|Y
01|236800|1|1|Estimated lead time is 3~4 weeks after receipt of an|Y
01|236800|1|2|order.|Y
01|236800|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236800|3|2|placed after September 1st 2025(until further notice).|Y
01|236800|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236800|3|4|of every order.|Y
01|236801|1|1|Installed w/ PS-123-AIR at factory|Y
01|236801|2|1|Installed on NC5-46-SK6C-75 at factory|Y
01|236801|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236801|3|2|placed after September 1st 2025(until further notice).|Y
01|236801|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236801|3|4|of every order.|Y
01|236802|13|1|A tariff surcharge of 8% will be added to every order|Y
01|236802|13|2|placed after September 1st 2025(until further notice).|Y
01|236802|13|3|This surcharge will be acknowledged upon acceptance|Y
01|236802|13|4|of every order.|Y
01|236803|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236803|4|2|placed after September 1st 2025(until further notice).|Y
01|236803|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236803|4|4|of every order.|Y
01|236804|1|1|Final Part# TBD|Y
01|236804|1|2|CAT40-C1.1/4SL-105U-IDU with 2-Hole DIN modified in|Y
01|236804|1|3|house.|Y
01|236804|1|4|**NET Price includes cost of holder + mod fee**|Y
01|236804|1|5|**Non-cancellable non-returnable**|Y
01|236804|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236804|2|2|placed after September 1st 2025(until further notice).|Y
01|236804|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236804|2|4|of every order.|Y
01|236806|1|1|**Cannot be cancelled or returned after invoicing*|Y
01|236806|8|1|**Cannot be cancelled or returned after invoicing**|Y
01|236806|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236806|9|2|placed after September 1st 2025(until further notice).|Y
01|236806|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236806|9|4|of every order.|Y
01|236807|4|1|Additional 20% discount added only to the|Y
01|236807|4|2|CAT50-VC6F-135U for our Overstock Promotion.  Once a|Y
01|236807|4|3|Purchase Order is received this item cannot be|Y
01|236807|4|4|cancelled or returned.|Y
01|236807|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236807|7|2|placed after September 1st 2025(until further notice).|Y
01|236807|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236807|7|4|of every order.|Y
01|236808|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236808|4|2|placed after September 1st 2025(until further notice).|Y
01|236808|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236808|4|4|of every order.|Y
01|236809|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236809|2|2|placed after September 1st 2025(until further notice).|Y
01|236809|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236809|2|4|of every order.|Y
01|236810|1|1|KS-SWBOX-SA199 used in place of TCE-97910|Y
01|236810|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236810|2|2|placed after September 1st 2025(until further notice).|Y
01|236810|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236810|2|4|of every order.|Y
01|236811|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236811|3|2|placed after September 1st 2025(until further notice).|Y
01|236811|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236811|3|4|of every order.|Y
01|236812|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236812|3|2|placed after September 1st 2025(until further notice).|Y
01|236812|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236812|3|4|of every order.|Y
01|236813|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236813|2|2|placed after September 1st 2025(until further notice).|Y
01|236813|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236813|2|4|of every order.|Y
01|236814|4|1|Currently three (3) in stock in Illinois.  Balance of|Y
01|236814|4|2|three (3) is in stock in Japan.  Estimated lead time|Y
01|236814|4|3|for the balance is 2~3 weeks after receipt of an order.|Y
01|236814|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236814|7|2|placed after September 1st 2025(until further notice).|Y
01|236814|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236814|7|4|of every order.|Y
01|236815|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236815|2|2|placed after September 1st 2025(until further notice).|Y
01|236815|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236815|2|4|of every order.|Y
01|236816|1|1|REF: QUA-62197 repair. This is for the purchase of new.|Y
01|236816|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236816|2|2|placed after September 1st 2025(until further notice).|Y
01|236816|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236816|2|4|of every order.|Y
01|236817|1|1|HSK63A-FMC32-60 (HSK63A Shell Mill Holder 32mm)|Y
01|236817|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236817|3|2|placed after September 1st 2025(until further notice).|Y
01|236817|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236817|3|4|of every order.|Y
01|236818|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236818|6|2|placed after September 1st 2025(until further notice).|Y
01|236818|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236818|6|4|of every order.|Y
01|236819|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236819|2|2|placed after September 1st 2025(until further notice).|Y
01|236819|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236819|2|4|of every order.|Y
01|236820|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236820|2|2|placed after September 1st 2025(until further notice).|Y
01|236820|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236820|2|4|of every order.|Y
01|236821|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236821|7|2|placed after September 1st 2025(until further notice).|Y
01|236821|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236821|7|4|of every order.|Y
01|236822|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236822|3|2|placed after September 1st 2025(until further notice).|Y
01|236822|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236822|3|4|of every order.|Y
01|236823|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236823|5|2|placed after September 1st 2025(until further notice).|Y
01|236823|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236823|5|4|of every order.|Y
01|236824|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236824|2|2|placed after September 1st 2025(until further notice).|Y
01|236824|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236824|2|4|of every order.|Y
01|236826|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236826|2|2|placed after September 1st 2025(until further notice).|Y
01|236826|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236826|2|4|of every order.|Y
01|236827|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236827|2|2|placed after September 1st 2025(until further notice).|Y
01|236827|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236827|2|4|of every order.|Y
01|236828|1|1|**non-cancellable non-returnable once a PO has been|Y
01|236828|1|2|placed.**|Y
01|236828|2|1|LN to make positioning block after receipt of spindle|Y
01|236828|2|2|measurements|Y
01|236828|2|3|**Cannot be cancelled or returned**|Y
01|236828|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236828|3|2|placed after September 1st 2025(until further notice).|Y
01|236828|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236828|3|4|of every order.|Y
01|236829|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236829|2|2|placed after September 1st 2025(until further notice).|Y
01|236829|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236829|2|4|of every order.|Y
01|236830|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236830|2|2|placed after September 1st 2025(until further notice).|Y
01|236830|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236830|2|4|of every order.|Y
01|236831|1|1|Estimated lead time 6~8 weeks after receipt of an|Y
01|236831|1|2|order.|Y
01|236831|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236831|3|2|placed after September 1st 2025(until further notice).|Y
01|236831|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236831|3|4|of every order.|Y
01|236832|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236832|7|2|placed after September 1st 2025(until further notice).|Y
01|236832|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236832|7|4|of every order.|Y
01|236833|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236833|4|2|placed after September 1st 2025(until further notice).|Y
01|236833|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236833|4|4|of every order.|Y
01|236834|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236834|2|2|placed after September 1st 2025(until further notice).|Y
01|236834|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236834|2|4|of every order.|Y
01|236835|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236835|2|2|placed after September 1st 2025(until further notice).|Y
01|236835|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236835|2|4|of every order.|Y
01|236836|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236836|4|2|placed after September 1st 2025(until further notice).|Y
01|236836|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236836|4|4|of every order.|Y
01|236837|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236837|2|2|placed after September 1st 2025(until further notice).|Y
01|236837|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236837|2|4|of every order.|Y
01|236838|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236838|5|2|placed after September 1st 2025(until further notice).|Y
01|236838|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236838|5|4|of every order.|Y
01|236839|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236839|2|2|placed after September 1st 2025(until further notice).|Y
01|236839|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236839|2|4|of every order.|Y
01|236840|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236840|2|2|placed after September 1st 2025(until further notice).|Y
01|236840|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236840|2|4|of every order.|Y
01|236841|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236841|2|2|placed after September 1st 2025(until further notice).|Y
01|236841|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236841|2|4|of every order.|Y
01|236844|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236844|3|2|placed after September 1st 2025(until further notice).|Y
01|236844|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236844|3|4|of every order.|Y
01|236845|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236845|5|2|placed after September 1st 2025(until further notice).|Y
01|236845|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236845|5|4|of every order.|Y
01|236846|11|1|A tariff surcharge of 8% will be added to every order|Y
01|236846|11|2|placed after September 1st 2025(until further notice).|Y
01|236846|11|3|This surcharge will be acknowledged upon acceptance|Y
01|236846|11|4|of every order.|Y
01|236847|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236847|5|2|placed after September 1st 2025(until further notice).|Y
01|236847|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236847|5|4|of every order.|Y
01|236849|1|1|Live Tooling Only|Y
01|236849|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236849|2|2|placed after September 1st 2025(until further notice).|Y
01|236849|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236849|2|4|of every order.|Y
01|236851|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236851|3|2|placed after September 1st 2025(until further notice).|Y
01|236851|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236851|3|4|of every order.|Y
01|236852|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236852|2|2|placed after September 1st 2025(until further notice).|Y
01|236852|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236852|2|4|of every order.|Y
01|236853|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236853|2|2|placed after September 1st 2025(until further notice).|Y
01|236853|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236853|2|4|of every order.|Y
01|236854|10|1|MI40 Axial Live Tool External Coolant MOQ: 2units|Y
01|236854|11|1|MI40 Axial Live Tool INT/EXT Coolant MOQ: 4units|Y
01|236854|15|1|WRENCH-ER25I|Y
01|236854|15|2|Dovetail Wrench ER25 Internal NUT|Y
01|236855|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|236855|-13|2|placed after September 1st 2025(until further notice).|Y
01|236855|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|236855|-13|4|of every order.|Y
01|236856|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236856|2|2|placed after September 1st 2025(until further notice).|Y
01|236856|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236856|2|4|of every order.|Y
01|236857|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236857|4|2|placed after September 1st 2025(until further notice).|Y
01|236857|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236857|4|4|of every order.|Y
01|236858|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236858|2|2|placed after September 1st 2025(until further notice).|Y
01|236858|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236858|2|4|of every order.|Y
01|236859|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236859|3|2|placed after September 1st 2025(until further notice).|Y
01|236859|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236859|3|4|of every order.|Y
01|236860|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236860|2|2|placed after September 1st 2025(until further notice).|Y
01|236860|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236860|2|4|of every order.|Y
01|236861|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236861|8|2|placed after September 1st 2025(until further notice).|Y
01|236861|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236861|8|4|of every order.|Y
01|236862|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236862|2|2|placed after September 1st 2025(until further notice).|Y
01|236862|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236862|2|4|of every order.|Y
01|236863|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236863|4|2|placed after September 1st 2025(until further notice).|Y
01|236863|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236863|4|4|of every order.|Y
01|236864|1|1|**Non-cancellable non-returnable**|Y
01|236864|7|1|**non-cancellable non-returnable**|Y
01|236864|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236864|9|2|placed after September 1st 2025(until further notice).|Y
01|236864|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236864|9|4|of every order.|Y
01|236865|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236865|3|2|placed after September 1st 2025(until further notice).|Y
01|236865|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236865|3|4|of every order.|Y
01|236866|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|236866|-13|2|placed after September 1st 2025(until further notice).|Y
01|236866|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|236866|-13|4|of every order.|Y
01|236867|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236867|8|2|placed after September 1st 2025(until further notice).|Y
01|236867|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236867|8|4|of every order.|Y
01|236868|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236868|6|2|placed after September 1st 2025(until further notice).|Y
01|236868|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236868|6|4|of every order.|Y
01|236869|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236869|5|2|placed after September 1st 2025(until further notice).|Y
01|236869|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236869|5|4|of every order.|Y
01|236870|12|1|A tariff surcharge of 8% will be added to every order|Y
01|236870|12|2|placed after September 1st 2025(until further notice).|Y
01|236870|12|3|This surcharge will be acknowledged upon acceptance|Y
01|236870|12|4|of every order.|Y
01|236871|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236871|2|2|placed after September 1st 2025(until further notice).|Y
01|236871|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236871|2|4|of every order.|Y
01|236872|15|1|A tariff surcharge of 8% will be added to every order|Y
01|236872|15|2|placed after September 1st 2025(until further notice).|Y
01|236872|15|3|This surcharge will be acknowledged upon acceptance|Y
01|236872|15|4|of every order.|Y
01|236873|1|1|SPECIAL COOLANT TUBES INCLUDED|Y
01|236873|19|1|A tariff surcharge of 8% will be added to every order|Y
01|236873|19|2|placed after September 1st 2025(until further notice).|Y
01|236873|19|3|This surcharge will be acknowledged upon acceptance|Y
01|236873|19|4|of every order.|Y
01|236874|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236874|4|2|placed after September 1st 2025(until further notice).|Y
01|236874|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236874|4|4|of every order.|Y
01|236875|12|1|A tariff surcharge may be added to this quotation in|Y
01|236875|12|2|the event of a sustained tariff increase on the|Y
01|236875|12|3|importation of this product.  Any surcharge will be|Y
01|236875|12|4|disclosed prior to acceptance of an order.|Y
01|236876|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236876|2|2|placed after September 1st 2025(until further notice).|Y
01|236876|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236876|2|4|of every order.|Y
01|236877|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236877|7|2|placed after September 1st 2025(until further notice).|Y
01|236877|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236877|7|4|of every order.|Y
01|236878|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236878|7|2|placed after September 1st 2025(until further notice).|Y
01|236878|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236878|7|4|of every order.|Y
01|236880|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236880|2|2|placed after September 1st 2025(until further notice).|Y
01|236880|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236880|2|4|of every order.|Y
01|236881|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236881|4|2|placed after September 1st 2025(until further notice).|Y
01|236881|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236881|4|4|of every order.|Y
01|236882|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|236882|-13|2|placed after September 1st 2025(until further notice).|Y
01|236882|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|236882|-13|4|of every order.|Y
01|236883|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236883|2|2|placed after September 1st 2025(until further notice).|Y
01|236883|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236883|2|4|of every order.|Y
01|236884|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236884|2|2|placed after September 1st 2025(until further notice).|Y
01|236884|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236884|2|4|of every order.|Y
01|236885|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236885|6|2|placed after September 1st 2025(until further notice).|Y
01|236885|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236885|6|4|of every order.|Y
01|236886|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236886|2|2|placed after September 1st 2025(until further notice).|Y
01|236886|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236886|2|4|of every order.|Y
01|236887|1|1|**NET Price**|Y
01|236887|1|2|C4006-32-4.00 w/ 2-Hole DIN modified in house.|Y
01|236887|1|3|**Custom item - cannot be cancelled or returned upon|Y
01|236887|1|4|receipt of order**|Y
01|236887|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236887|2|2|placed after September 1st 2025(until further notice).|Y
01|236887|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236887|2|4|of every order.|Y
01|236889|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236889|2|2|placed after September 1st 2025(until further notice).|Y
01|236889|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236889|2|4|of every order.|Y
01|236890|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236890|2|2|placed after September 1st 2025(until further notice).|Y
01|236890|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236890|2|4|of every order.|Y
01|236892|3|1|Model 800 8'' DIA Air Chuck (.0001'' / 2.54u TIR) Air|Y
01|236892|3|2|chuck.|Y
01|236892|4|1|Special Adapter Plate to mount 800 series chucks to|Y
01|236892|4|2|face plate|Y
01|236892|5|1|Model NF-800 Top Jaw set jaws are made of alloy steel|Y
01|236892|6|1|AIR TUBE-DRY-STD 101411|Y
01|236892|7|1|MACHINED SUPPORT BUSHING|Y
01|236892|8|1|MANUAL VALVE STD 109755|Y
01|236892|9|1|Air Filter/Regulator/Lubricator unit. Standard size.|Y
01|236892|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236892|10|2|placed after September 1st 2025(until further notice).|Y
01|236892|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236892|10|4|of every order.|Y
01|236893|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236893|2|2|placed after September 1st 2025(until further notice).|Y
01|236893|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236893|2|4|of every order.|Y
01|236895|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236895|5|2|placed after September 1st 2025(until further notice).|Y
01|236895|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236895|5|4|of every order.|Y
01|236896|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236896|3|2|placed after September 1st 2025(until further notice).|Y
01|236896|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236896|3|4|of every order.|Y
01|236897|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236897|2|2|placed after September 1st 2025(until further notice).|Y
01|236897|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236897|2|4|of every order.|Y
01|236899|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236899|2|2|placed after September 1st 2025(until further notice).|Y
01|236899|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236899|2|4|of every order.|Y
01|236900|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236900|4|2|placed after September 1st 2025(until further notice).|Y
01|236900|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236900|4|4|of every order.|Y
01|236901|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236901|5|2|placed after September 1st 2025(until further notice).|Y
01|236901|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236901|5|4|of every order.|Y
01|236902|1|1|These are non-standard stock items and considered|Y
01|236902|1|2|specials. Once a PO has been issued these items|Y
01|236902|1|3|cannot be cancelled or returned.|Y
01|236902|2|1|Final Part# C4007-0032-5.00DIN-M|Y
01|236902|2|2|These are non standard stock items and considered|Y
01|236902|2|3|specials. Once a PO has been issued these items|Y
01|236902|2|4|cannot be cancelled or returned.|Y
01|236902|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236902|3|2|placed after September 1st 2025(until further notice).|Y
01|236902|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236902|3|4|of every order.|Y
01|236903|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236903|2|2|placed after September 1st 2025(until further notice).|Y
01|236903|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236903|2|4|of every order.|Y
01|236904|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236904|2|2|placed after September 1st 2025(until further notice).|Y
01|236904|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236904|2|4|of every order.|Y
01|236905|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236905|5|2|placed after September 1st 2025(until further notice).|Y
01|236905|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236905|5|4|of every order.|Y
01|236906|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236906|4|2|placed after September 1st 2025(until further notice).|Y
01|236906|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236906|4|4|of every order.|Y
01|236907|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236907|3|2|placed after September 1st 2025(until further notice).|Y
01|236907|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236907|3|4|of every order.|Y
01|236908|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236908|2|2|placed after September 1st 2025(until further notice).|Y
01|236908|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236908|2|4|of every order.|Y
01|236909|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236909|2|2|placed after September 1st 2025(until further notice).|Y
01|236909|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236909|2|4|of every order.|Y
01|236910|2|1|Installation date TBD at time of purchase.|Y
01|236910|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236910|3|2|placed after September 1st 2025(until further notice).|Y
01|236910|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236910|3|4|of every order.|Y
01|236911|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236911|2|2|placed after September 1st 2025(until further notice).|Y
01|236911|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236911|2|4|of every order.|Y
01|236912|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236912|3|2|placed after September 1st 2025(until further notice).|Y
01|236912|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236912|3|4|of every order.|Y
01|236913|20|1|A tariff surcharge of 8% will be added to every order|Y
01|236913|20|2|placed after September 1st 2025(until further notice).|Y
01|236913|20|3|This surcharge will be acknowledged upon acceptance|Y
01|236913|20|4|of every order.|Y
01|236914|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236914|3|2|placed after September 1st 2025(until further notice).|Y
01|236914|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236914|3|4|of every order.|Y
01|236915|20|1|A tariff surcharge of 8% will be added to every order|Y
01|236915|20|2|placed after September 1st 2025(until further notice).|Y
01|236915|20|3|This surcharge will be acknowledged upon acceptance|Y
01|236915|20|4|of every order.|Y
01|236916|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236916|2|2|placed after September 1st 2025(until further notice).|Y
01|236916|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236916|2|4|of every order.|Y
01|236917|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236917|3|2|placed after September 1st 2025(until further notice).|Y
01|236917|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236917|3|4|of every order.|Y
01|236918|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236918|3|2|placed after September 1st 2025(until further notice).|Y
01|236918|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236918|3|4|of every order.|Y
01|236919|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236919|2|2|placed after September 1st 2025(until further notice).|Y
01|236919|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236919|2|4|of every order.|Y
01|236920|1|1|Please Note: This is a part for a 1/2 drill chuck.|Y
01|236920|1|2|The jaw set is non-returnable.|Y
01|236920|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236920|2|2|placed after September 1st 2025(until further notice).|Y
01|236920|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236920|2|4|of every order.|Y
01|236921|1|1|Delivery: 1 pc 2 weeks 3 pcs 5-6 weeks.|Y
01|236921|1|2|*Quoted at NET price considered a special.|Y
01|236921|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236921|2|2|placed after September 1st 2025(until further notice).|Y
01|236921|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236921|2|4|of every order.|Y
01|236922|9|1|A tariff surcharge of 8% will be added to every order|Y
01|236922|9|2|placed after September 1st 2025(until further notice).|Y
01|236922|9|3|This surcharge will be acknowledged upon acceptance|Y
01|236922|9|4|of every order.|Y
01|236923|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236923|3|2|placed after September 1st 2025(until further notice).|Y
01|236923|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236923|3|4|of every order.|Y
01|236924|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236924|7|2|placed after September 1st 2025(until further notice).|Y
01|236924|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236924|7|4|of every order.|Y
01|236925|23|1|A tariff surcharge of 8% will be added to every order|Y
01|236925|23|2|placed after September 1st 2025(until further notice).|Y
01|236925|23|3|This surcharge will be acknowledged upon acceptance|Y
01|236925|23|4|of every order.|Y
01|236926|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236926|2|2|placed after September 1st 2025(until further notice).|Y
01|236926|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236926|2|4|of every order.|Y
01|236927|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236927|2|2|placed after September 1st 2025(until further notice).|Y
01|236927|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236927|2|4|of every order.|Y
01|236928|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236928|2|2|placed after September 1st 2025(until further notice).|Y
01|236928|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236928|2|4|of every order.|Y
01|236929|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236929|3|2|placed after September 1st 2025(until further notice).|Y
01|236929|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236929|3|4|of every order.|Y
01|236930|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236930|3|2|placed after September 1st 2025(until further notice).|Y
01|236930|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236930|3|4|of every order.|Y
01|236931|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236931|2|2|placed after September 1st 2025(until further notice).|Y
01|236931|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236931|2|4|of every order.|Y
01|236932|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236932|2|2|placed after September 1st 2025(until further notice).|Y
01|236932|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236932|2|4|of every order.|Y
01|236933|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236933|2|2|placed after September 1st 2025(until further notice).|Y
01|236933|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236933|2|4|of every order.|Y
01|236934|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236934|4|2|placed after September 1st 2025(until further notice).|Y
01|236934|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236934|4|4|of every order.|Y
01|236935|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236935|2|2|placed after September 1st 2025(until further notice).|Y
01|236935|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236935|2|4|of every order.|Y
01|236936|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236936|4|2|placed after September 1st 2025(until further notice).|Y
01|236936|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236936|4|4|of every order.|Y
01|236937|20|1|A tariff surcharge of 8% will be added to every order|Y
01|236937|20|2|placed after September 1st 2025(until further notice).|Y
01|236937|20|3|This surcharge will be acknowledged upon acceptance|Y
01|236937|20|4|of every order.|Y
01|236938|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236938|2|2|placed after September 1st 2025(until further notice).|Y
01|236938|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236938|2|4|of every order.|Y
01|236939|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236939|2|2|placed after September 1st 2025(until further notice).|Y
01|236939|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236939|2|4|of every order.|Y
01|236940|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236940|4|2|placed after September 1st 2025(until further notice).|Y
01|236940|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236940|4|4|of every order.|Y
01|236941|2|1|ZeroClamp SP Clamping Base for Variaxis i800 Mazak|Y
01|236941|2|2|Base size 500mm x 500mm Pod ZP 120 x 5pcs.|Y
01|236941|2|3|SP Order Item. NET Price Each. Cancellations cannot be|Y
01|236941|2|4|accepted once the order has been received.|Y
01|236941|2|5|Delivery: 10 weeks Mfg + Shipping(Boat 6-8weeks)|Y
01|236941|2|6|Air freight is also available as an option. Please NOTE|Y
01|236941|2|7|that an additional Air freight cost will be applied.|Y
01|236941|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236941|3|2|placed after September 1st 2025(until further notice).|Y
01|236941|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236941|3|4|of every order.|Y
01|236942|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236942|2|2|placed after September 1st 2025(until further notice).|Y
01|236942|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236942|2|4|of every order.|Y
01|236943|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236943|2|2|placed after September 1st 2025(until further notice).|Y
01|236943|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236943|2|4|of every order.|Y
01|236944|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236944|2|2|placed after September 1st 2025(until further notice).|Y
01|236944|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236944|2|4|of every order.|Y
01|236945|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236945|2|2|placed after September 1st 2025(until further notice).|Y
01|236945|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236945|2|4|of every order.|Y
01|236946|1|1|Quoted at NET price.|Y
01|236946|2|1|Quoted at NET price.|Y
01|236947|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236947|2|2|placed after September 1st 2025(until further notice).|Y
01|236947|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236947|2|4|of every order.|Y
01|236948|5|1|A tariff surcharge of 8% will be added to every order|Y
01|236948|5|2|placed after September 1st 2025(until further notice).|Y
01|236948|5|3|This surcharge will be acknowledged upon acceptance|Y
01|236948|5|4|of every order.|Y
01|236949|1|1|Only one (1) remaining at the factory.  Estimated lead|Y
01|236949|1|2|time is 2~3 weeks after receipt of an order.  PLEASE|Y
01|236949|1|3|NOTE:  This item will be discontinued once the one (1)|Y
01|236949|1|4|is sold.  The replacement Item # CAT50-SK20-200U-IDU.|Y
01|236949|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236949|4|2|placed after September 1st 2025(until further notice).|Y
01|236949|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236949|4|4|of every order.|Y
01|236950|21|1|A tariff surcharge of 8% will be added to every order|Y
01|236950|21|2|placed after September 1st 2025(until further notice).|Y
01|236950|21|3|This surcharge will be acknowledged upon acceptance|Y
01|236950|21|4|of every order.|Y
01|236951|11|1|A tariff surcharge of 8% will be added to every order|Y
01|236951|11|2|placed after September 1st 2025(until further notice).|Y
01|236951|11|3|This surcharge will be acknowledged upon acceptance|Y
01|236951|11|4|of every order.|Y
01|236952|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236952|3|2|placed after September 1st 2025(until further notice).|Y
01|236952|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236952|3|4|of every order.|Y
01|236953|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236953|2|2|placed after September 1st 2025(until further notice).|Y
01|236953|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236953|2|4|of every order.|Y
01|236954|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236954|2|2|placed after September 1st 2025(until further notice).|Y
01|236954|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236954|2|4|of every order.|Y
01|236955|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236955|8|2|placed after September 1st 2025(until further notice).|Y
01|236955|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236955|8|4|of every order.|Y
01|236957|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236957|2|2|placed after September 1st 2025(until further notice).|Y
01|236957|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236957|2|4|of every order.|Y
01|236958|1|1|No INS Required.|Y
01|236958|2|1|No INS Required.|Y
01|236958|3|1|No INS Required.|Y
01|236958|4|1|No INS Required.|Y
01|236958|5|1|No INS Required.|Y
01|236958|6|1|No INS Required.|Y
01|236958|7|1|No INS Required.|Y
01|236958|8|1|No INS Required.|Y
01|236958|9|1|No INS Required. To make set #OR.VPA.DC/VPA.0620.DC|Y
01|236958|10|1|A tariff surcharge of 8% will be added to every order|Y
01|236958|10|2|placed after September 1st 2025(until further notice).|Y
01|236958|10|3|This surcharge will be acknowledged upon acceptance|Y
01|236958|10|4|of every order.|Y
01|236959|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236959|3|2|placed after September 1st 2025(until further notice).|Y
01|236959|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236959|3|4|of every order.|Y
01|236960|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236960|2|2|placed after September 1st 2025(until further notice).|Y
01|236960|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236960|2|4|of every order.|Y
01|236961|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236961|2|2|placed after September 1st 2025(until further notice).|Y
01|236961|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236961|2|4|of every order.|Y
01|236962|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236962|2|2|placed after September 1st 2025(until further notice).|Y
01|236962|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236962|2|4|of every order.|Y
01|236963|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236963|3|2|placed after September 1st 2025(until further notice).|Y
01|236963|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236963|3|4|of every order.|Y
01|236964|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236964|2|2|placed after September 1st 2025(until further notice).|Y
01|236964|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236964|2|4|of every order.|Y
01|236965|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236965|2|2|placed after September 1st 2025(until further notice).|Y
01|236965|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236965|2|4|of every order.|Y
01|236966|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236966|4|2|placed after September 1st 2025(until further notice).|Y
01|236966|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236966|4|4|of every order.|Y
01|236967|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236967|4|2|placed after September 1st 2025(until further notice).|Y
01|236967|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236967|4|4|of every order.|Y
01|236968|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236968|3|2|placed after September 1st 2025(until further notice).|Y
01|236968|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236968|3|4|of every order.|Y
01|236969|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236969|2|2|placed after September 1st 2025(until further notice).|Y
01|236969|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236969|2|4|of every order.|Y
01|236970|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236970|4|2|placed after September 1st 2025(until further notice).|Y
01|236970|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236970|4|4|of every order.|Y
01|236971|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236971|7|2|placed after September 1st 2025(until further notice).|Y
01|236971|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236971|7|4|of every order.|Y
01|236972|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236972|2|2|placed after September 1st 2025(until further notice).|Y
01|236972|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236972|2|4|of every order.|Y
01|236973|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236973|2|2|placed after September 1st 2025(until further notice).|Y
01|236973|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236973|2|4|of every order.|Y
01|236974|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236974|2|2|placed after September 1st 2025(until further notice).|Y
01|236974|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236974|2|4|of every order.|Y
01|236975|16|1|A tariff surcharge of 8% will be added to every order|Y
01|236975|16|2|placed after September 1st 2025(until further notice).|Y
01|236975|16|3|This surcharge will be acknowledged upon acceptance|Y
01|236975|16|4|of every order.|Y
01|236976|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236976|2|2|placed after September 1st 2025(until further notice).|Y
01|236976|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236976|2|4|of every order.|Y
01|236977|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236977|2|2|placed after September 1st 2025(until further notice).|Y
01|236977|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236977|2|4|of every order.|Y
01|236978|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236978|2|2|placed after September 1st 2025(until further notice).|Y
01|236978|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236978|2|4|of every order.|Y
01|236980|2|1|Please note additional 20% applied per overstock promo.|Y
01|236980|2|2|Once PO/order issued these cannot be cancelled or|Y
01|236980|2|3|returned. Price and availability will needed to be|Y
01|236980|2|4|requoted upon stock depletion.|Y
01|236980|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236980|3|2|placed after September 1st 2025(until further notice).|Y
01|236980|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236980|3|4|of every order.|Y
01|236981|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236981|2|2|placed after September 1st 2025(until further notice).|Y
01|236981|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236981|2|4|of every order.|Y
01|236982|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236982|3|2|placed after September 1st 2025(until further notice).|Y
01|236982|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236982|3|4|of every order.|Y
01|236983|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236983|4|2|placed after September 1st 2025(until further notice).|Y
01|236983|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236983|4|4|of every order.|Y
01|236984|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236984|2|2|placed after September 1st 2025(until further notice).|Y
01|236984|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236984|2|4|of every order.|Y
01|236985|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236985|2|2|placed after September 1st 2025(until further notice).|Y
01|236985|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236985|2|4|of every order.|Y
01|236986|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236986|2|2|placed after September 1st 2025(until further notice).|Y
01|236986|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236986|2|4|of every order.|Y
01|236988|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236988|2|2|placed after September 1st 2025(until further notice).|Y
01|236988|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236988|2|4|of every order.|Y
01|236989|7|1|A tariff surcharge of 8% will be added to every order|Y
01|236989|7|2|placed after September 1st 2025(until further notice).|Y
01|236989|7|3|This surcharge will be acknowledged upon acceptance|Y
01|236989|7|4|of every order.|Y
01|236990|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236990|4|2|placed after September 1st 2025(until further notice).|Y
01|236990|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236990|4|4|of every order.|Y
01|236991|1|1|Overstock Discount-Final Sale|Y
01|236991|3|1|Overstock Discount-Final Sale|Y
01|236991|6|1|A tariff surcharge of 8% will be added to every order|Y
01|236991|6|2|placed after September 1st 2025(until further notice).|Y
01|236991|6|3|This surcharge will be acknowledged upon acceptance|Y
01|236991|6|4|of every order.|Y
01|236992|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236992|8|2|placed after September 1st 2025(until further notice).|Y
01|236992|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236992|8|4|of every order.|Y
01|236993|2|1|Please note additional 20% applied per overstock promo.|Y
01|236993|2|2|Once PO/order issued these cannot be cancelled or|Y
01|236993|2|3|returned. This will need to be requoted for price &|Y
01|236993|2|4|availbility upon stock depletion.|Y
01|236993|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236993|4|2|placed after September 1st 2025(until further notice).|Y
01|236993|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236993|4|4|of every order.|Y
01|236994|3|1|A tariff surcharge of 8% will be added to every order|Y
01|236994|3|2|placed after September 1st 2025(until further notice).|Y
01|236994|3|3|This surcharge will be acknowledged upon acceptance|Y
01|236994|3|4|of every order.|Y
01|236995|4|1|A tariff surcharge of 8% will be added to every order|Y
01|236995|4|2|placed after September 1st 2025(until further notice).|Y
01|236995|4|3|This surcharge will be acknowledged upon acceptance|Y
01|236995|4|4|of every order.|Y
01|236996|8|1|A tariff surcharge of 8% will be added to every order|Y
01|236996|8|2|placed after September 1st 2025(until further notice).|Y
01|236996|8|3|This surcharge will be acknowledged upon acceptance|Y
01|236996|8|4|of every order.|Y
01|236997|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236997|2|2|placed after September 1st 2025(until further notice).|Y
01|236997|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236997|2|4|of every order.|Y
01|236998|16|1|A tariff surcharge of 8% will be added to every order|Y
01|236998|16|2|placed after September 1st 2025(until further notice).|Y
01|236998|16|3|This surcharge will be acknowledged upon acceptance|Y
01|236998|16|4|of every order.|Y
01|236999|2|1|A tariff surcharge of 8% will be added to every order|Y
01|236999|2|2|placed after September 1st 2025(until further notice).|Y
01|236999|2|3|This surcharge will be acknowledged upon acceptance|Y
01|236999|2|4|of every order.|Y
01|237000|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237000|3|2|placed after September 1st 2025(until further notice).|Y
01|237000|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237000|3|4|of every order.|Y
01|237001|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237001|2|2|placed after September 1st 2025(until further notice).|Y
01|237001|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237001|2|4|of every order.|Y
01|237002|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237002|2|2|placed after September 1st 2025(until further notice).|Y
01|237002|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237002|2|4|of every order.|Y
01|237003|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237003|4|2|placed after September 1st 2025(until further notice).|Y
01|237003|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237003|4|4|of every order.|Y
01|237004|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237004|7|2|placed after September 1st 2025(until further notice).|Y
01|237004|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237004|7|4|of every order.|Y
01|237005|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237005|7|2|placed after September 1st 2025(until further notice).|Y
01|237005|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237005|7|4|of every order.|Y
01|237006|27|1|A tariff surcharge of 8% will be added to every order|Y
01|237006|27|2|placed after September 1st 2025(until further notice).|Y
01|237006|27|3|This surcharge will be acknowledged upon acceptance|Y
01|237006|27|4|of every order.|Y
01|237007|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237007|3|2|placed after September 1st 2025(until further notice).|Y
01|237007|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237007|3|4|of every order.|Y
01|237008|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237008|3|2|placed after September 1st 2025(until further notice).|Y
01|237008|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237008|3|4|of every order.|Y
01|237009|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237009|6|2|placed after September 1st 2025(until further notice).|Y
01|237009|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237009|6|4|of every order.|Y
01|237010|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237010|4|2|placed after September 1st 2025(until further notice).|Y
01|237010|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237010|4|4|of every order.|Y
01|237011|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|237011|2|1|Req.INS/Install E40-NUT & ER40-SCREW(C)|Y
01|237011|3|1|Req.INS/Install S9/16-18X1/2|Y
01|237011|4|1|Req.INS/Install E32-NUT|Y
01|237011|5|1|Req.INS/OD Groove frange Dia issue|Y
01|237011|6|1|Req.INS/Make sure equipped Rego Nut/Stock/Orizon|Y
01|237011|7|1|Req.INS/Make sure equipped Rego Nut/Stock/Orizon|Y
01|237011|8|1|Req.INS/Install E32-NUT & ER32-SCREW(C) Stock/Orizon|Y
01|237011|9|1|Req.INS/Install E40-SCRE & ER40-SCREW(C) Stock/Orizon|Y
01|237011|10|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|237011|11|1|A tariff surcharge of 8% will be added to every order|Y
01|237011|11|2|placed after September 1st 2025(until further notice).|Y
01|237011|11|3|This surcharge will be acknowledged upon acceptance|Y
01|237011|11|4|of every order.|Y
01|237012|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237012|3|2|placed after September 1st 2025(until further notice).|Y
01|237012|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237012|3|4|of every order.|Y
01|237013|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237013|2|2|placed after September 1st 2025(until further notice).|Y
01|237013|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237013|2|4|of every order.|Y
01|237014|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237014|3|2|placed after September 1st 2025(until further notice).|Y
01|237014|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237014|3|4|of every order.|Y
01|237015|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237015|5|2|placed after September 1st 2025(until further notice).|Y
01|237015|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237015|5|4|of every order.|Y
01|237016|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237016|6|2|placed after September 1st 2025(until further notice).|Y
01|237016|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237016|6|4|of every order.|Y
01|237017|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237017|7|2|placed after September 1st 2025(until further notice).|Y
01|237017|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237017|7|4|of every order.|Y
01|237018|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237018|3|2|placed after September 1st 2025(until further notice).|Y
01|237018|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237018|3|4|of every order.|Y
01|237019|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237019|6|2|placed after September 1st 2025(until further notice).|Y
01|237019|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237019|6|4|of every order.|Y
01|237020|4|1|Customer is responsible for 3rd party software option.|Y
01|237020|4|2|This option will be required to Nikken table on HAAS.|Y
01|237020|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237020|5|2|placed after September 1st 2025(until further notice).|Y
01|237020|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237020|5|4|of every order.|Y
01|237021|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237021|3|2|placed after September 1st 2025(until further notice).|Y
01|237021|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237021|3|4|of every order.|Y
01|237022|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237022|2|2|placed after September 1st 2025(until further notice).|Y
01|237022|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237022|2|4|of every order.|Y
01|237023|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237023|2|2|placed after September 1st 2025(until further notice).|Y
01|237023|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237023|2|4|of every order.|Y
01|237024|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237024|3|2|placed after September 1st 2025(until further notice).|Y
01|237024|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237024|3|4|of every order.|Y
01|237025|1|1|Collet to be laser marked at L-N W/ AT459235 REV -|Y
01|237025|2|1|Laser mark Pratts # AT459235REV- on collets|Y
01|237025|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237025|3|2|placed after September 1st 2025(until further notice).|Y
01|237025|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237025|3|4|of every order.|Y
01|237026|1|1|1st Batch/(1)1004810/Productivity/3M   3/24 approvedMF|Y
01|237026|2|1|1st Batch/For stock 4/8/25:DWG APRVED/TimRMFG120day(9/|Y
01|237027|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237027|4|2|placed after September 1st 2025(until further notice).|Y
01|237027|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237027|4|4|of every order.|Y
01|237028|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237028|2|2|placed after September 1st 2025(until further notice).|Y
01|237028|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237028|2|4|of every order.|Y
01|237029|1|1|FOR MAZAK EX32 VMC. M-CODE W/ FIN SIGNAL RQR'D|Y
01|237029|1|2|208-230vac 3PH. SUPPLY REQUIRED|Y
01|237029|1|3|AIR SUPPLY REQUIRED|Y
01|237029|1|4|VERBAL ACCEPTANCE OF ORDER 8/28/25|Y
01|237029|1|5|PRICE REDUCED FROM $26989.00|Y
01|237029|2|1|ELECTRICAL INSTALLATION KIT FOR MAZAK EZ32 -208-230VAC|Y
01|237029|2|2|LOCAL INSTALLATION SUPPORT|Y
01|237029|2|3|ELECTRICAL PRINT REVIEW RECOMMENDED|Y
01|237029|3|1|Price reduced from $1340.00|Y
01|237029|4|1|Price reduced from $2067.00|Y
01|237029|5|1|THIS QUOTE IS TARIFF FREE UNTIL 9/16/25|Y
01|237030|1|1|Quoted at net price minimum order quantity is|Y
01|237030|1|2|3 holders.|Y
01|237030|2|1|Delivery 12~13 Weeks ARO|Y
01|237030|12|1|A tariff surcharge of 8% will be added to every order|Y
01|237030|12|2|placed after September 1st 2025(until further notice).|Y
01|237030|12|3|This surcharge will be acknowledged upon acceptance|Y
01|237030|12|4|of every order.|Y
01|237031|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237031|2|2|placed after September 1st 2025(until further notice).|Y
01|237031|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237031|2|4|of every order.|Y
01|237032|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237032|7|2|placed after September 1st 2025(until further notice).|Y
01|237032|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237032|7|4|of every order.|Y
01|237033|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|237033|-13|2|placed after September 1st 2025(until further notice).|Y
01|237033|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|237033|-13|4|of every order.|Y
01|237034|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237034|2|2|placed after September 1st 2025(until further notice).|Y
01|237034|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237034|2|4|of every order.|Y
01|237035|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237035|2|2|placed after September 1st 2025(until further notice).|Y
01|237035|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237035|2|4|of every order.|Y
01|237036|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237036|7|2|placed after September 1st 2025(until further notice).|Y
01|237036|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237036|7|4|of every order.|Y
01|237037|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237037|2|2|placed after September 1st 2025(until further notice).|Y
01|237037|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237037|2|4|of every order.|Y
01|237038|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237038|4|2|placed after September 1st 2025(until further notice).|Y
01|237038|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237038|4|4|of every order.|Y
01|237039|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237039|7|2|placed after September 1st 2025(until further notice).|Y
01|237039|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237039|7|4|of every order.|Y
01|237040|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237040|2|2|placed after September 1st 2025(until further notice).|Y
01|237040|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237040|2|4|of every order.|Y
01|237041|1|1|93.05.036.009|Y
01|237041|1|2|HSK63A 6mm HC|Y
01|237041|1|3|Non-cancellable/non-returnable|Y
01|237041|2|1|93.05.036.010|Y
01|237041|2|2|HSK63A 8mm|Y
01|237041|2|3|Non-cancellable/non-returnable|Y
01|237041|3|1|93.05.036.011|Y
01|237041|3|2|HSK63A 10mm|Y
01|237041|3|3|Non-cancellable/non-returnable|Y
01|237041|4|1|93.05.036.012|Y
01|237041|4|2|HSK63A 12mm|Y
01|237041|4|3|Non-cancellable/non-returnable|Y
01|237041|5|1|93.05.036.013|Y
01|237041|5|2|HSK63A 14mm|Y
01|237041|5|3|Non-cancellable/non-returnable|Y
01|237041|6|1|93.05.036.014|Y
01|237041|6|2|HSK63A 16mm|Y
01|237041|6|3|Non-cancellable/non-returnable|Y
01|237041|7|1|93.05.036.016|Y
01|237041|7|2|HSK63A 20mm|Y
01|237041|7|3|Non-cancellable/non-returnable|Y
01|237041|30|1|A tariff surcharge of 8% will be added to every order|Y
01|237041|30|2|placed after September 1st 2025(until further notice).|Y
01|237041|30|3|This surcharge will be acknowledged upon acceptance|Y
01|237041|30|4|of every order.|Y
01|237042|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237042|3|2|placed after September 1st 2025(until further notice).|Y
01|237042|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237042|3|4|of every order.|Y
01|237043|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237043|2|2|placed after September 1st 2025(until further notice).|Y
01|237043|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237043|2|4|of every order.|Y
01|237044|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237044|2|2|placed after September 1st 2025(until further notice).|Y
01|237044|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237044|2|4|of every order.|Y
01|237045|1|1|FOR TOYODA WELE FV1680 Oi-MD|Y
01|237045|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237045|5|2|placed after September 1st 2025(until further notice).|Y
01|237045|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237045|5|4|of every order.|Y
01|237046|1|1|RGA#LVR-62168/|Y
01|237046|1|2|Repair of OKL3-ER32X(OKU-L370-X)  s/n: AL623|Y
01|237046|1|3|(Alps#OK101-14000)|Y
01|237046|2|1|Bearings o-rings and collet nuts to be replaced.|Y
01|237046|4|1|RGA#LVR-62168/|Y
01|237046|4|2|Repair of OKL3-ER32Z-OFMS(OKU-L370MW-DB)  s/n: AL143|Y
01|237046|4|3|(Alps#OK109-15001)|Y
01|237046|5|1|Bearings o-rings and collet nuts to be replaced.|Y
01|237046|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237046|6|2|placed after September 1st 2025(until further notice).|Y
01|237046|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237046|6|4|of every order.|Y
01|237047|1|1|Delivery is 10-12 wks after approval draw is signed|Y
01|237047|1|2|and returned|Y
01|237047|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237047|2|2|placed after September 1st 2025(until further notice).|Y
01|237047|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237047|2|4|of every order.|Y
01|237048|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237048|4|2|placed after September 1st 2025(until further notice).|Y
01|237048|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237048|4|4|of every order.|Y
01|237049|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237049|2|2|placed after September 1st 2025(until further notice).|Y
01|237049|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237049|2|4|of every order.|Y
01|237050|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237050|2|2|placed after September 1st 2025(until further notice).|Y
01|237050|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237050|2|4|of every order.|Y
01|237051|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237051|5|2|placed after September 1st 2025(until further notice).|Y
01|237051|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237051|5|4|of every order.|Y
01|237052|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237052|2|2|placed after September 1st 2025(until further notice).|Y
01|237052|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237052|2|4|of every order.|Y
01|237053|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237053|2|2|placed after September 1st 2025(until further notice).|Y
01|237053|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237053|2|4|of every order.|Y
01|237055|1|1|**This is special custom item. Cannot be cancelled or|Y
01|237055|1|2|returned upon receipt of PO**|Y
01|237055|1|3|**Comes pre-threaded with M16x2 Threads**|Y
01|237055|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237055|3|2|placed after September 1st 2025(until further notice).|Y
01|237055|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237055|3|4|of every order.|Y
01|237056|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237056|7|2|placed after September 1st 2025(until further notice).|Y
01|237056|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237056|7|4|of every order.|Y
01|237057|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237057|2|2|placed after September 1st 2025(until further notice).|Y
01|237057|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237057|2|4|of every order.|Y
01|237058|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237058|7|2|placed after September 1st 2025(until further notice).|Y
01|237058|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237058|7|4|of every order.|Y
01|237059|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237059|5|2|placed after September 1st 2025(until further notice).|Y
01|237059|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237059|5|4|of every order.|Y
01|237060|14|1|A tariff surcharge of 8% will be added to every order|Y
01|237060|14|2|placed after September 1st 2025(until further notice).|Y
01|237060|14|3|This surcharge will be acknowledged upon acceptance|Y
01|237060|14|4|of every order.|Y
01|237061|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237061|5|2|placed after September 1st 2025(until further notice).|Y
01|237061|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237061|5|4|of every order.|Y
01|237062|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237062|4|2|placed after September 1st 2025(until further notice).|Y
01|237062|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237062|4|4|of every order.|Y
01|237063|2|1|FINISHING JAWS|Y
01|237063|3|1|ROUGHING JAWS|Y
01|237063|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237063|5|2|placed after September 1st 2025(until further notice).|Y
01|237063|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237063|5|4|of every order.|Y
01|237064|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237064|2|2|placed after September 1st 2025(until further notice).|Y
01|237064|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237064|2|4|of every order.|Y
01|237065|11|1|A tariff surcharge of 8% will be added to every order|Y
01|237065|11|2|placed after September 1st 2025(until further notice).|Y
01|237065|11|3|This surcharge will be acknowledged upon acceptance|Y
01|237065|11|4|of every order.|Y
01|237065|14|1|Please Note: We currently have one E346N in stock and|Y
01|237065|14|2|many quote requests. I cannot guarantee this pre-setter|Y
01|237065|14|3|will be here long.|Y
01|237066|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237066|2|2|placed after September 1st 2025(until further notice).|Y
01|237066|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237066|2|4|of every order.|Y
01|237067|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237067|3|2|placed after September 1st 2025(until further notice).|Y
01|237067|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237067|3|4|of every order.|Y
01|237068|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237068|2|2|placed after September 1st 2025(until further notice).|Y
01|237068|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237068|2|4|of every order.|Y
01|237069|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237069|2|2|placed after September 1st 2025(until further notice).|Y
01|237069|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237069|2|4|of every order.|Y
01|237070|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237070|2|2|placed after September 1st 2025(until further notice).|Y
01|237070|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237070|2|4|of every order.|Y
01|237071|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237071|2|2|placed after September 1st 2025(until further notice).|Y
01|237071|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237071|2|4|of every order.|Y
01|237072|19|1|A tariff surcharge of 8% will be added to every order|Y
01|237072|19|2|placed after September 1st 2025(until further notice).|Y
01|237072|19|3|This surcharge will be acknowledged upon acceptance|Y
01|237072|19|4|of every order.|Y
01|237073|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237073|2|2|placed after September 1st 2025(until further notice).|Y
01|237073|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237073|2|4|of every order.|Y
01|237074|5|1|Estimated lead time is 3~5 days after design|Y
01|237074|5|2|confirmation.|Y
01|237074|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237074|7|2|placed after September 1st 2025(until further notice).|Y
01|237074|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237074|7|4|of every order.|Y
01|237075|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237075|4|2|placed after September 1st 2025(until further notice).|Y
01|237075|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237075|4|4|of every order.|Y
01|237076|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237076|4|2|placed after September 1st 2025(until further notice).|Y
01|237076|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237076|4|4|of every order.|Y
01|237077|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237077|7|2|placed after September 1st 2025(until further notice).|Y
01|237077|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237077|7|4|of every order.|Y
01|237078|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237078|2|2|placed after September 1st 2025(until further notice).|Y
01|237078|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237078|2|4|of every order.|Y
01|237079|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237079|6|2|placed after September 1st 2025(until further notice).|Y
01|237079|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237079|6|4|of every order.|Y
01|237080|9|1|A tariff surcharge of 8% will be added to every order|Y
01|237080|9|2|placed after September 1st 2025(until further notice).|Y
01|237080|9|3|This surcharge will be acknowledged upon acceptance|Y
01|237080|9|4|of every order.|Y
01|237081|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237081|5|2|placed after September 1st 2025(until further notice).|Y
01|237081|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237081|5|4|of every order.|Y
01|237082|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237082|2|2|placed after September 1st 2025(until further notice).|Y
01|237082|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237082|2|4|of every order.|Y
01|237083|1|1|2 Year Warranty|Y
01|237083|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237083|5|2|placed after September 1st 2025(until further notice).|Y
01|237083|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237083|5|4|of every order.|Y
01|237084|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237084|3|2|placed after September 1st 2025(until further notice).|Y
01|237084|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237084|3|4|of every order.|Y
01|237085|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237085|2|2|placed after September 1st 2025(until further notice).|Y
01|237085|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237085|2|4|of every order.|Y
01|237087|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237087|2|2|placed after September 1st 2025(until further notice).|Y
01|237087|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237087|2|4|of every order.|Y
01|237088|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237088|5|2|placed after September 1st 2025(until further notice).|Y
01|237088|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237088|5|4|of every order.|Y
01|237089|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237089|2|2|placed after September 1st 2025(until further notice).|Y
01|237089|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237089|2|4|of every order.|Y
01|237090|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237090|3|2|placed after September 1st 2025(until further notice).|Y
01|237090|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237090|3|4|of every order.|Y
01|237091|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237091|2|2|placed after September 1st 2025(until further notice).|Y
01|237091|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237091|2|4|of every order.|Y
01|237092|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237092|3|2|placed after September 1st 2025(until further notice).|Y
01|237092|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237092|3|4|of every order.|Y
01|237093|9|1|A tariff surcharge of 8% will be added to every order|Y
01|237093|9|2|placed after September 1st 2025(until further notice).|Y
01|237093|9|3|This surcharge will be acknowledged upon acceptance|Y
01|237093|9|4|of every order.|Y
01|237094|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237094|3|2|placed after September 1st 2025(until further notice).|Y
01|237094|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237094|3|4|of every order.|Y
01|237095|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237095|2|2|placed after September 1st 2025(until further notice).|Y
01|237095|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237095|2|4|of every order.|Y
01|237096|20|1|A tariff surcharge of 8% will be added to every order|Y
01|237096|20|2|placed after September 1st 2025(until further notice).|Y
01|237096|20|3|This surcharge will be acknowledged upon acceptance|Y
01|237096|20|4|of every order.|Y
01|237097|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237097|4|2|placed after September 1st 2025(until further notice).|Y
01|237097|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237097|4|4|of every order.|Y
01|237098|12|1|A tariff surcharge of 8% will be added to every order|Y
01|237098|12|2|placed after September 1st 2025(until further notice).|Y
01|237098|12|3|This surcharge will be acknowledged upon acceptance|Y
01|237098|12|4|of every order.|Y
01|237099|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237099|3|2|placed after September 1st 2025(until further notice).|Y
01|237099|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237099|3|4|of every order.|Y
01|237100|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237100|2|2|placed after September 1st 2025(until further notice).|Y
01|237100|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237100|2|4|of every order.|Y
01|237101|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237101|3|2|placed after September 1st 2025(until further notice).|Y
01|237101|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237101|3|4|of every order.|Y
01|237102|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237102|2|2|placed after September 1st 2025(until further notice).|Y
01|237102|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237102|2|4|of every order.|Y
01|237103|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237103|2|2|placed after September 1st 2025(until further notice).|Y
01|237103|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237103|2|4|of every order.|Y
01|237105|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237105|4|2|placed after September 1st 2025(until further notice).|Y
01|237105|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237105|4|4|of every order.|Y
01|237106|6|1|This is a time based estimate.|Y
01|237106|6|2|Any parts that would be required would be additional.|Y
01|237106|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237106|7|2|placed after September 1st 2025(until further notice).|Y
01|237106|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237106|7|4|of every order.|Y
01|237107|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237107|5|2|placed after September 1st 2025(until further notice).|Y
01|237107|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237107|5|4|of every order.|Y
01|237108|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237108|2|2|placed after September 1st 2025(until further notice).|Y
01|237108|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237108|2|4|of every order.|Y
01|237109|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237109|2|2|placed after September 1st 2025(until further notice).|Y
01|237109|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237109|2|4|of every order.|Y
01|237110|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237110|2|2|placed after September 1st 2025(until further notice).|Y
01|237110|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237110|2|4|of every order.|Y
01|237111|14|1|A tariff surcharge of 8% will be added to every order|Y
01|237111|14|2|placed after September 1st 2025(until further notice).|Y
01|237111|14|3|This surcharge will be acknowledged upon acceptance|Y
01|237111|14|4|of every order.|Y
01|237112|18|1|A tariff surcharge of 8% will be added to every order|Y
01|237112|18|2|placed after September 1st 2025(until further notice).|Y
01|237112|18|3|This surcharge will be acknowledged upon acceptance|Y
01|237112|18|4|of every order.|Y
01|237113|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237113|3|2|placed after September 1st 2025(until further notice).|Y
01|237113|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237113|3|4|of every order.|Y
01|237115|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237115|4|2|placed after September 1st 2025(until further notice).|Y
01|237115|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237115|4|4|of every order.|Y
01|237116|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237116|2|2|placed after September 1st 2025(until further notice).|Y
01|237116|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237116|2|4|of every order.|Y
01|237117|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237117|2|2|placed after September 1st 2025(until further notice).|Y
01|237117|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237117|2|4|of every order.|Y
01|237118|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237118|5|2|placed after September 1st 2025(until further notice).|Y
01|237118|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237118|5|4|of every order.|Y
01|237119|1|1|P/N: MZQT47-ER40Z-HS-C or ICE|Y
01|237119|1|2|Mazak Quick Turn ER40 hi-speed Coolant|Y
01|237119|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237119|2|2|placed after September 1st 2025(until further notice).|Y
01|237119|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237119|2|4|of every order.|Y
01|237120|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237120|2|2|placed after September 1st 2025(until further notice).|Y
01|237120|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237120|2|4|of every order.|Y
01|237121|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237121|2|2|placed after September 1st 2025(until further notice).|Y
01|237121|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237121|2|4|of every order.|Y
01|237122|13|1|A tariff surcharge of 8% will be added to every order|Y
01|237122|13|2|placed after September 1st 2025(until further notice).|Y
01|237122|13|3|This surcharge will be acknowledged upon acceptance|Y
01|237122|13|4|of every order.|Y
01|237123|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237123|3|2|placed after September 1st 2025(until further notice).|Y
01|237123|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237123|3|4|of every order.|Y
01|237124|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237124|3|2|placed after September 1st 2025(until further notice).|Y
01|237124|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237124|3|4|of every order.|Y
01|237125|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237125|7|2|placed after September 1st 2025(until further notice).|Y
01|237125|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237125|7|4|of every order.|Y
01|237126|11|1|A tariff surcharge of 8% will be added to every order|Y
01|237126|11|2|placed after September 1st 2025(until further notice).|Y
01|237126|11|3|This surcharge will be acknowledged upon acceptance|Y
01|237126|11|4|of every order.|Y
01|237127|13|1|A tariff surcharge of 8% will be added to every order|Y
01|237127|13|2|placed after September 1st 2025(until further notice).|Y
01|237127|13|3|This surcharge will be acknowledged upon acceptance|Y
01|237127|13|4|of every order.|Y
01|237129|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237129|4|2|placed after September 1st 2025(until further notice).|Y
01|237129|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237129|4|4|of every order.|Y
01|237130|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237130|3|2|placed after September 1st 2025(until further notice).|Y
01|237130|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237130|3|4|of every order.|Y
01|237131|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237131|3|2|placed after September 1st 2025(until further notice).|Y
01|237131|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237131|3|4|of every order.|Y
01|237132|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237132|2|2|placed after September 1st 2025(until further notice).|Y
01|237132|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237132|2|4|of every order.|Y
01|237133|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237133|2|2|placed after September 1st 2025(until further notice).|Y
01|237133|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237133|2|4|of every order.|Y
01|237134|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237134|2|2|placed after September 1st 2025(until further notice).|Y
01|237134|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237134|2|4|of every order.|Y
01|237135|11|1|A tariff surcharge of 8% will be added to every order|Y
01|237135|11|2|placed after September 1st 2025(until further notice).|Y
01|237135|11|3|This surcharge will be acknowledged upon acceptance|Y
01|237135|11|4|of every order.|Y
01|237136|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237136|2|2|placed after September 1st 2025(until further notice).|Y
01|237136|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237136|2|4|of every order.|Y
01|237137|1|1|Tailstock: TC500-L|Y
01|237137|1|2|Manual Tailstock - Lefty Handle|Y
01|237137|1|3|Center Height 280mm+/-0.3mm|Y
01|237137|1|4|Includes: Morse Taper#4 Dead Center|Y
01|237137|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237137|2|2|placed after September 1st 2025(until further notice).|Y
01|237137|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237137|2|4|of every order.|Y
01|237138|1|1|Tariff Free Verbal agreement. Stock product only!|Y
01|237138|1|2|approved -ChrisD|Y
01|237139|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237139|6|2|placed after September 1st 2025(until further notice).|Y
01|237139|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237139|6|4|of every order.|Y
01|237140|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237140|2|2|placed after September 1st 2025(until further notice).|Y
01|237140|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237140|2|4|of every order.|Y
01|237141|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237141|4|2|placed after September 1st 2025(until further notice).|Y
01|237141|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237141|4|4|of every order.|Y
01|237142|1|1|Includes Power and Feedback cables from the Nikken|Y
01|237142|1|2|Table to the machine bulkhead|Y
01|237142|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237142|4|2|placed after September 1st 2025(until further notice).|Y
01|237142|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237142|4|4|of every order.|Y
01|237143|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237143|2|2|placed after September 1st 2025(until further notice).|Y
01|237143|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237143|2|4|of every order.|Y
01|237144|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237144|3|2|placed after September 1st 2025(until further notice).|Y
01|237144|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237144|3|4|of every order.|Y
01|237145|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237145|3|2|placed after September 1st 2025(until further notice).|Y
01|237145|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237145|3|4|of every order.|Y
01|237146|1|1|Estimate is quoted at Net price for PRE-E346PLUS-I50|Y
01|237146|1|2|includes preventative maintenance and calibration.|Y
01|237146|1|3|Lyndex-Nikken Contact Eric Hartman 847-269-9641|Y
01|237146|1|4|or e-mail erich@lyndexnikken.com|Y
01|237146|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237146|2|2|placed after September 1st 2025(until further notice).|Y
01|237146|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237146|2|4|of every order.|Y
01|237147|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237147|2|2|placed after September 1st 2025(until further notice).|Y
01|237147|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237147|2|4|of every order.|Y
01|237148|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237148|2|2|placed after September 1st 2025(until further notice).|Y
01|237148|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237148|2|4|of every order.|Y
01|237149|10|1|A tariff surcharge of 8% will be added to every order|Y
01|237149|10|2|placed after September 1st 2025(until further notice).|Y
01|237149|10|3|This surcharge will be acknowledged upon acceptance|Y
01|237149|10|4|of every order.|Y
01|237150|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237150|8|2|placed after September 1st 2025(until further notice).|Y
01|237150|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237150|8|4|of every order.|Y
01|237151|9|1|A tariff surcharge of 8% will be added to every order|Y
01|237151|9|2|placed after September 1st 2025(until further notice).|Y
01|237151|9|3|This surcharge will be acknowledged upon acceptance|Y
01|237151|9|4|of every order.|Y
01|237152|1|1|PRICING INCLUDES 8% SURCHARGE|Y
01|237152|2|1|PRICING INCLUDES 8% SURCHARGE|Y
01|237152|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237152|7|2|placed after September 1st 2025(until further notice).|Y
01|237152|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237152|7|4|of every order.|Y
01|237153|1|1|**NET Price**|Y
01|237153|1|2|SPECIAL - Cannot be cancelled or returned upon|Y
01|237153|1|3|receipt of a PO|Y
01|237153|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237153|4|2|placed after September 1st 2025(until further notice).|Y
01|237153|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237153|4|4|of every order.|Y
01|237154|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237154|3|2|placed after September 1st 2025(until further notice).|Y
01|237154|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237154|3|4|of every order.|Y
01|237155|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237155|4|2|placed after September 1st 2025(until further notice).|Y
01|237155|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237155|4|4|of every order.|Y
01|237156|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237156|2|2|placed after September 1st 2025(until further notice).|Y
01|237156|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237156|2|4|of every order.|Y
01|237157|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237157|2|2|placed after September 1st 2025(until further notice).|Y
01|237157|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237157|2|4|of every order.|Y
01|237158|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237158|2|2|placed after September 1st 2025(until further notice).|Y
01|237158|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237158|2|4|of every order.|Y
01|237159|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237159|8|2|placed after September 1st 2025(until further notice).|Y
01|237159|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237159|8|4|of every order.|Y
01|237160|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237160|2|2|placed after September 1st 2025(until further notice).|Y
01|237160|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237160|2|4|of every order.|Y
01|237161|6|1|This is a time based estimate.|Y
01|237161|6|2|Any parts that would be required would be additional.|Y
01|237161|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237161|7|2|placed after September 1st 2025(until further notice).|Y
01|237161|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237161|7|4|of every order.|Y
01|237163|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237163|2|2|placed after September 1st 2025(until further notice).|Y
01|237163|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237163|2|4|of every order.|Y
01|237164|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237164|2|2|placed after September 1st 2025(until further notice).|Y
01|237164|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237164|2|4|of every order.|Y
01|237165|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237165|5|2|placed after September 1st 2025(until further notice).|Y
01|237165|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237165|5|4|of every order.|Y
01|237166|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237166|2|2|placed after September 1st 2025(until further notice).|Y
01|237166|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237166|2|4|of every order.|Y
01|237167|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237167|3|2|placed after September 1st 2025(until further notice).|Y
01|237167|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237167|3|4|of every order.|Y
01|237168|1|1|RGA#TOR-62222/|Y
01|237168|1|2|Repair of PF-2|Y
01|237168|3|1|Calibration service included.|Y
01|237168|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237168|4|2|placed after September 1st 2025(until further notice).|Y
01|237168|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237168|4|4|of every order.|Y
01|237169|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237169|3|2|placed after September 1st 2025(until further notice).|Y
01|237169|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237169|3|4|of every order.|Y
01|237170|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237170|2|2|placed after September 1st 2025(until further notice).|Y
01|237170|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237170|2|4|of every order.|Y
01|237171|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237171|7|2|placed after September 1st 2025(until further notice).|Y
01|237171|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237171|7|4|of every order.|Y
01|237172|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237172|4|2|placed after September 1st 2025(until further notice).|Y
01|237172|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237172|4|4|of every order.|Y
01|237173|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237173|4|2|placed after September 1st 2025(until further notice).|Y
01|237173|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237173|4|4|of every order.|Y
01|237174|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237174|6|2|placed after September 1st 2025(until further notice).|Y
01|237174|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237174|6|4|of every order.|Y
01|237175|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237175|2|2|placed after September 1st 2025(until further notice).|Y
01|237175|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237175|2|4|of every order.|Y
01|237176|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237176|6|2|placed after September 1st 2025(until further notice).|Y
01|237176|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237176|6|4|of every order.|Y
01|237177|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237177|3|2|placed after September 1st 2025(until further notice).|Y
01|237177|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237177|3|4|of every order.|Y
01|237178|3|1|A tariff surcharge may be added to this quotation in|Y
01|237178|3|2|the event of a sustained tariff increase on the|Y
01|237178|3|3|importation of this product.  Any surcharge will be|Y
01|237178|3|4|disclosed prior to acceptance of an order.|Y
01|237179|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237179|3|2|placed after September 1st 2025(until further notice).|Y
01|237179|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237179|3|4|of every order.|Y
01|237180|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237180|3|2|placed after September 1st 2025(until further notice).|Y
01|237180|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237180|3|4|of every order.|Y
01|237181|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237181|2|2|placed after September 1st 2025(until further notice).|Y
01|237181|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237181|2|4|of every order.|Y
01|237182|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237182|2|2|placed after September 1st 2025(until further notice).|Y
01|237182|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237182|2|4|of every order.|Y
01|237183|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237183|2|2|placed after September 1st 2025(until further notice).|Y
01|237183|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237183|2|4|of every order.|Y
01|237184|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237184|2|2|placed after September 1st 2025(until further notice).|Y
01|237184|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237184|2|4|of every order.|Y
01|237185|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237185|2|2|placed after September 1st 2025(until further notice).|Y
01|237185|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237185|2|4|of every order.|Y
01|237186|1|1|**Special - cannot be cancelled or returned upon|Y
01|237186|1|2|receipt of a PO**|Y
01|237186|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237186|2|2|placed after September 1st 2025(until further notice).|Y
01|237186|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237186|2|4|of every order.|Y
01|237187|9|1|A tariff surcharge of 8% will be added to every order|Y
01|237187|9|2|placed after September 1st 2025(until further notice).|Y
01|237187|9|3|This surcharge will be acknowledged upon acceptance|Y
01|237187|9|4|of every order.|Y
01|237188|1|1|QUANTITY BREAK NET PRICING:|Y
01|237188|1|2|1-4pc: $760.00 ea/net|Y
01|237188|1|3|5-9pc: $326.00 ea/net|Y
01|237188|1|4|10pc+: $218.00 ea/net|Y
01|237188|3|1|QUANTITY BREAK NET PRICING:|Y
01|237188|3|2|1-4pc: $760.00 ea/net|Y
01|237188|3|3|5-9pc: $326.00 ea/net|Y
01|237188|3|4|10pc+: $218.00 ea/net|Y
01|237188|8|1|Please note additional 20% applied per overstock promo.|Y
01|237188|8|2|Once PO/order issued these cannot be cancelled or|Y
01|237188|8|3|returned. These will need to be requoted for price &|Y
01|237188|8|4|availability upon stock depletion.|Y
01|237189|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237189|4|2|placed after September 1st 2025(until further notice).|Y
01|237189|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237189|4|4|of every order.|Y
01|237190|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237190|2|2|placed after September 1st 2025(until further notice).|Y
01|237190|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237190|2|4|of every order.|Y
01|237191|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237191|3|2|placed after September 1st 2025(until further notice).|Y
01|237191|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237191|3|4|of every order.|Y
01|237192|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237192|5|2|placed after September 1st 2025(until further notice).|Y
01|237192|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237192|5|4|of every order.|Y
01|237193|2|1|NET pricing|Y
01|237193|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237193|3|2|placed after September 1st 2025(until further notice).|Y
01|237193|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237193|3|4|of every order.|Y
01|237194|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237194|4|2|placed after September 1st 2025(until further notice).|Y
01|237194|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237194|4|4|of every order.|Y
01|237195|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237195|2|2|placed after September 1st 2025(until further notice).|Y
01|237195|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237195|2|4|of every order.|Y
01|237196|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237196|3|2|placed after September 1st 2025(until further notice).|Y
01|237196|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237196|3|4|of every order.|Y
01|237197|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237197|2|2|placed after September 1st 2025(until further notice).|Y
01|237197|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237197|2|4|of every order.|Y
01|237198|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237198|2|2|placed after September 1st 2025(until further notice).|Y
01|237198|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237198|2|4|of every order.|Y
01|237199|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237199|2|2|placed after September 1st 2025(until further notice).|Y
01|237199|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237199|2|4|of every order.|Y
01|237200|1|1|HSK63A-C12EX-96#   No Chip Hole|Y
01|237200|2|1|HSK63A-C16EX-100#  No Chip Hole|Y
01|237200|3|1|HSK63A-C20EX-105#  No Chip Hole|Y
01|237200|4|1|HSK63A-C25EX-110#   No Chip Hole|Y
01|237200|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|237200|-13|2|placed after September 1st 2025(until further notice).|Y
01|237200|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|237200|-13|4|of every order.|Y
01|237202|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237202|3|2|placed after September 1st 2025(until further notice).|Y
01|237202|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237202|3|4|of every order.|Y
01|237203|22|1|A tariff surcharge of 8% will be added to every order|Y
01|237203|22|2|placed after September 1st 2025(until further notice).|Y
01|237203|22|3|This surcharge will be acknowledged upon acceptance|Y
01|237203|22|4|of every order.|Y
01|237204|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237204|2|2|placed after September 1st 2025(until further notice).|Y
01|237204|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237204|2|4|of every order.|Y
01|237205|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237205|2|2|placed after September 1st 2025(until further notice).|Y
01|237205|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237205|2|4|of every order.|Y
01|237206|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237206|3|2|placed after September 1st 2025(until further notice).|Y
01|237206|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237206|3|4|of every order.|Y
01|237207|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237207|2|2|placed after September 1st 2025(until further notice).|Y
01|237207|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237207|2|4|of every order.|Y
01|237208|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237208|4|2|placed after September 1st 2025(until further notice).|Y
01|237208|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237208|4|4|of every order.|Y
01|237209|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237209|2|2|placed after September 1st 2025(until further notice).|Y
01|237209|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237209|2|4|of every order.|Y
01|237210|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237210|2|2|placed after September 1st 2025(until further notice).|Y
01|237210|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237210|2|4|of every order.|Y
01|237211|16|1|A tariff surcharge of 8% will be added to every order|Y
01|237211|16|2|placed after September 1st 2025(until further notice).|Y
01|237211|16|3|This surcharge will be acknowledged upon acceptance|Y
01|237211|16|4|of every order.|Y
01|237212|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237212|4|2|placed after September 1st 2025(until further notice).|Y
01|237212|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237212|4|4|of every order.|Y
01|237213|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237213|3|2|placed after September 1st 2025(until further notice).|Y
01|237213|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237213|3|4|of every order.|Y
01|237214|16|1|A tariff surcharge of 8% will be added to every order|Y
01|237214|16|2|placed after September 1st 2025(until further notice).|Y
01|237214|16|3|This surcharge will be acknowledged upon acceptance|Y
01|237214|16|4|of every order.|Y
01|237215|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237215|2|2|placed after September 1st 2025(until further notice).|Y
01|237215|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237215|2|4|of every order.|Y
01|237216|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237216|3|2|placed after September 1st 2025(until further notice).|Y
01|237216|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237216|3|4|of every order.|Y
01|237217|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237217|2|2|placed after September 1st 2025(until further notice).|Y
01|237217|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237217|2|4|of every order.|Y
01|237219|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237219|2|2|placed after September 1st 2025(until further notice).|Y
01|237219|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237219|2|4|of every order.|Y
01|237221|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237221|4|2|placed after September 1st 2025(until further notice).|Y
01|237221|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237221|4|4|of every order.|Y
01|237222|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237222|3|2|placed after September 1st 2025(until further notice).|Y
01|237222|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237222|3|4|of every order.|Y
01|237223|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237223|5|2|placed after September 1st 2025(until further notice).|Y
01|237223|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237223|5|4|of every order.|Y
01|237224|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237224|2|2|placed after September 1st 2025(until further notice).|Y
01|237224|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237224|2|4|of every order.|Y
01|237225|14|1|A tariff surcharge of 8% will be added to every order|Y
01|237225|14|2|placed after September 1st 2025(until further notice).|Y
01|237225|14|3|This surcharge will be acknowledged upon acceptance|Y
01|237225|14|4|of every order.|Y
01|237226|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237226|2|2|placed after September 1st 2025(until further notice).|Y
01|237226|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237226|2|4|of every order.|Y
01|237227|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237227|2|2|placed after September 1st 2025(until further notice).|Y
01|237227|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237227|2|4|of every order.|Y
01|237228|1|1|MOQ 5 pcs NET PriceSPECIAL-cant be cancelled/returned|Y
01|237228|1|2|Customer must accept +1 overrun or -1 underrun for orde|Y
01|237228|1|3|rs 5-9 pcs should it occur. At that time a revised PO|Y
01|237228|1|4|will be requested.|Y
01|237228|2|1|MOQ 5 pcs NET PriceSPECIAL-cant be cancelled/returned|Y
01|237228|2|2|Customer must accept +1 overrun or -1 underrun for orde|Y
01|237228|2|3|rs 5-9 pcs should it occur. At that time a revised PO|Y
01|237228|2|4|will be requested.|Y
01|237228|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237228|4|2|placed after September 1st 2025(until further notice).|Y
01|237228|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237228|4|4|of every order.|Y
01|237229|1|1|Non-standard stock.Once a PO has been received it|Y
01|237229|1|2|cannot be cancelled or returned.|Y
01|237229|1|3|Quoted at NET pricing|Y
01|237229|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237229|2|2|placed after September 1st 2025(until further notice).|Y
01|237229|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237229|2|4|of every order.|Y
01|237230|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237230|2|2|placed after September 1st 2025(until further notice).|Y
01|237230|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237230|2|4|of every order.|Y
01|237231|1|1|NOTE: Standard Discount 28%|Y
01|237231|4|1|HSK63A-SK10C-90-RPNJ|Y
01|237231|4|2|HSK63A SK10 Nano-Jet Coolant Holder|Y
01|237231|10|1|HSK63A-CZF20-110-RPNJ|Y
01|237231|10|2|HSK63A CZF20 Zero fit Nano Coolant Holder|Y
01|237231|19|1|A tariff surcharge of 8% will be added to every order|Y
01|237231|19|2|placed after September 1st 2025(until further notice).|Y
01|237231|19|3|This surcharge will be acknowledged upon acceptance|Y
01|237231|19|4|of every order.|Y
01|237232|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237232|7|2|placed after September 1st 2025(until further notice).|Y
01|237232|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237232|7|4|of every order.|Y
01|237233|1|1|RGA#MOD-62193|Y
01|237233|1|2|CNC100A21 SN: 8298|Y
01|237233|4|1|TCE-94304|Y
01|237233|9|1|A tariff surcharge of 8% will be added to every order|Y
01|237233|9|2|placed after September 1st 2025(until further notice).|Y
01|237233|9|3|This surcharge will be acknowledged upon acceptance|Y
01|237233|9|4|of every order.|Y
01|237234|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237234|7|2|placed after September 1st 2025(until further notice).|Y
01|237234|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237234|7|4|of every order.|Y
01|237235|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237235|2|2|placed after September 1st 2025(until further notice).|Y
01|237235|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237235|2|4|of every order.|Y
01|237236|9|1|A tariff surcharge of 8% will be added to every order|Y
01|237236|9|2|placed after September 1st 2025(until further notice).|Y
01|237236|9|3|This surcharge will be acknowledged upon acceptance|Y
01|237236|9|4|of every order.|Y
01|237237|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237237|2|2|placed after September 1st 2025(until further notice).|Y
01|237237|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237237|2|4|of every order.|Y
01|237238|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237238|3|2|placed after September 1st 2025(until further notice).|Y
01|237238|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237238|3|4|of every order.|Y
01|237239|44|1|A tariff surcharge of 8% will be added to every order|Y
01|237239|44|2|placed after September 1st 2025(until further notice).|Y
01|237239|44|3|This surcharge will be acknowledged upon acceptance|Y
01|237239|44|4|of every order.|Y
01|237240|4|1|A tariff surcharge may be added to this quotation in|Y
01|237240|4|2|the event of a sustained tariff increase on the|Y
01|237240|4|3|importation of this product.  Any surcharge will be|Y
01|237240|4|4|disclosed prior to acceptance of an order.|Y
01|237241|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237241|2|2|placed after September 1st 2025(until further notice).|Y
01|237241|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237241|2|4|of every order.|Y
01|237242|1|1|Service call for PRE-E346PLUS-I50 s/n: 101268|Y
01|237242|1|2|This is a time based estimate.|Y
01|237242|1|3|Any parts that would be required would be additional.|Y
01|237242|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237242|2|2|placed after September 1st 2025(until further notice).|Y
01|237242|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237242|2|4|of every order.|Y
01|237243|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237243|2|2|placed after September 1st 2025(until further notice).|Y
01|237243|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237243|2|4|of every order.|Y
01|237244|13|1|A tariff surcharge of 8% will be added to every order|Y
01|237244|13|2|placed after September 1st 2025(until further notice).|Y
01|237244|13|3|This surcharge will be acknowledged upon acceptance|Y
01|237244|13|4|of every order.|Y
01|237245|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237245|2|2|placed after September 1st 2025(until further notice).|Y
01|237245|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237245|2|4|of every order.|Y
01|237246|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237246|3|2|placed after September 1st 2025(until further notice).|Y
01|237246|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237246|3|4|of every order.|Y
01|237247|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237247|5|2|placed after September 1st 2025(until further notice).|Y
01|237247|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237247|5|4|of every order.|Y
01|237248|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237248|3|2|placed after September 1st 2025(until further notice).|Y
01|237248|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237248|3|4|of every order.|Y
01|237249|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237249|2|2|placed after September 1st 2025(until further notice).|Y
01|237249|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237249|2|4|of every order.|Y
01|237250|1|1|Repair Period: 5-6weeks|Y
01|237250|1|2|(Parts 2weeks mfg. + Shipping 2weeks + Repair 1-2weeks)|Y
01|237250|1|3|CNCZ302FA-HS 10+1RJ SN 7180 EU: RDC|Y
01|237250|2|1|If order a repair or new table we will deny this cost.|Y
01|237251|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237251|4|2|placed after September 1st 2025(until further notice).|Y
01|237251|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237251|4|4|of every order.|Y
01|237252|2|1|Additional 5% discount.|Y
01|237252|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237252|3|2|placed after September 1st 2025(until further notice).|Y
01|237252|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237252|3|4|of every order.|Y
01|237253|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237253|2|2|placed after September 1st 2025(until further notice).|Y
01|237253|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237253|2|4|of every order.|Y
01|237254|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237254|2|2|placed after September 1st 2025(until further notice).|Y
01|237254|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237254|2|4|of every order.|Y
01|237255|11|1|A tariff surcharge of 8% will be added to every order|Y
01|237255|11|2|placed after September 1st 2025(until further notice).|Y
01|237255|11|3|This surcharge will be acknowledged upon acceptance|Y
01|237255|11|4|of every order.|Y
01|237256|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237256|5|2|placed after September 1st 2025(until further notice).|Y
01|237256|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237256|5|4|of every order.|Y
01|237257|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237257|2|2|placed after September 1st 2025(until further notice).|Y
01|237257|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237257|2|4|of every order.|Y
01|237259|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237259|6|2|placed after September 1st 2025(until further notice).|Y
01|237259|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237259|6|4|of every order.|Y
01|237260|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237260|2|2|placed after September 1st 2025(until further notice).|Y
01|237260|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237260|2|4|of every order.|Y
01|237261|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237261|2|2|placed after September 1st 2025(until further notice).|Y
01|237261|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237261|2|4|of every order.|Y
01|237262|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237262|4|2|placed after September 1st 2025(until further notice).|Y
01|237262|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237262|4|4|of every order.|Y
01|237263|1|1|For 5AX-130ZA SN:1765 RGA#TAR-61352|Y
01|237263|1|2|Full rebuild of the table include evallaborall basic|Y
01|237263|1|3|components(Bearings/Seals/ORings)+worm wheel+worm screw|Y
01|237263|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237263|2|2|placed after September 1st 2025(until further notice).|Y
01|237263|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237263|2|4|of every order.|Y
01|237264|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237264|4|2|placed after September 1st 2025(until further notice).|Y
01|237264|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237264|4|4|of every order.|Y
01|237265|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237265|2|2|placed after September 1st 2025(until further notice).|Y
01|237265|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237265|2|4|of every order.|Y
01|237266|13|1|Please Note: we are offering 50% discount if purchased|Y
01|237266|13|2|with the pre-setter. If customer wants just the|Y
01|237266|13|3|Test Bar please re-submit for quote. If purchased|Y
01|237266|13|4|separately the list price is $2069.00 less 35%.|Y
01|237266|14|1|Quoted at NET price contact Eric Hartman at|Y
01|237266|14|2|847-269-9641 or e-mail PRE_Team@lyndexnikken.com to|Y
01|237266|14|3|arrange installation and training.|Y
01|237267|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237267|2|2|placed after September 1st 2025(until further notice).|Y
01|237267|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237267|2|4|of every order.|Y
01|237268|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237268|2|2|placed after September 1st 2025(until further notice).|Y
01|237268|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237268|2|4|of every order.|Y
01|237270|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237270|2|2|placed after September 1st 2025(until further notice).|Y
01|237270|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237270|2|4|of every order.|Y
01|237271|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237271|4|2|placed after September 1st 2025(until further notice).|Y
01|237271|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237271|4|4|of every order.|Y
01|237272|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237272|2|2|placed after September 1st 2025(until further notice).|Y
01|237272|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237272|2|4|of every order.|Y
01|237273|20|1|A tariff surcharge of 8% will be added to every order|Y
01|237273|20|2|placed after September 1st 2025(until further notice).|Y
01|237273|20|3|This surcharge will be acknowledged upon acceptance|Y
01|237273|20|4|of every order.|Y
01|237274|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237274|3|2|placed after September 1st 2025(until further notice).|Y
01|237274|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237274|3|4|of every order.|Y
01|237275|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237275|4|2|placed after September 1st 2025(until further notice).|Y
01|237275|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237275|4|4|of every order.|Y
01|237277|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237277|5|2|placed after September 1st 2025(until further notice).|Y
01|237277|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237277|5|4|of every order.|Y
01|237278|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237278|2|2|placed after September 1st 2025(until further notice).|Y
01|237278|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237278|2|4|of every order.|Y
01|237279|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237279|4|2|placed after September 1st 2025(until further notice).|Y
01|237279|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237279|4|4|of every order.|Y
01|237280|2|1|Quoted at NET price.|Y
01|237281|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237281|2|2|placed after September 1st 2025(until further notice).|Y
01|237281|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237281|2|4|of every order.|Y
01|237282|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237282|5|2|placed after September 1st 2025(until further notice).|Y
01|237282|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237282|5|4|of every order.|Y
01|237283|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237283|8|2|placed after September 1st 2025(until further notice).|Y
01|237283|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237283|8|4|of every order.|Y
01|237284|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237284|7|2|placed after September 1st 2025(until further notice).|Y
01|237284|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237284|7|4|of every order.|Y
01|237285|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237285|7|2|placed after September 1st 2025(until further notice).|Y
01|237285|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237285|7|4|of every order.|Y
01|237286|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237286|2|2|placed after September 1st 2025(until further notice).|Y
01|237286|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237286|2|4|of every order.|Y
01|237287|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237287|8|2|placed after September 1st 2025(until further notice).|Y
01|237287|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237287|8|4|of every order.|Y
01|237288|76|1|A tariff surcharge of 8% will be added to every order|Y
01|237288|76|2|placed after September 1st 2025(until further notice)|Y
01|237288|76|3|This surcharge will be acknowledged upon acceptance|Y
01|237289|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237289|3|2|placed after September 1st 2025(until further notice).|Y
01|237289|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237289|3|4|of every order.|Y
01|237290|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237290|4|2|placed after September 1st 2025(until further notice).|Y
01|237290|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237290|4|4|of every order.|Y
01|237291|1|1|Part Number: C5001-0750-12.00CP|Y
01|237291|1|2|CAT50 Shell Mill Holder 3/4 CoolantPorts ChipHole 20K|Y
01|237291|1|3|12 Gage Length|Y
01|237291|1|4|*Lead time given as ADA - After Signed Drawing Approval|Y
01|237291|1|5|Please allow 1-2 weeks for LN to procure approval dwg.|Y
01|237291|1|6|**Minimum Order Quantity of 3 pcs|Y
01|237291|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237291|2|2|placed after September 1st 2025(until further notice).|Y
01|237291|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237291|2|4|of every order.|Y
01|237292|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237292|8|2|placed after September 1st 2025(until further notice).|Y
01|237292|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237292|8|4|of every order.|Y
01|237293|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237293|7|2|placed after September 1st 2025(until further notice).|Y
01|237293|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237293|7|4|of every order.|Y
01|237294|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237294|3|2|placed after September 1st 2025(until further notice).|Y
01|237294|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237294|3|4|of every order.|Y
01|237295|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237295|4|2|placed after September 1st 2025(until further notice).|Y
01|237295|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237295|4|4|of every order.|Y
01|237296|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237296|3|2|placed after September 1st 2025(until further notice).|Y
01|237296|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237296|3|4|of every order.|Y
01|237297|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237297|3|2|placed after September 1st 2025(until further notice).|Y
01|237297|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237297|3|4|of every order.|Y
01|237298|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237298|2|2|placed after September 1st 2025(until further notice).|Y
01|237298|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237298|2|4|of every order.|Y
01|237299|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237299|2|2|placed after September 1st 2025(until further notice).|Y
01|237299|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237299|2|4|of every order.|Y
01|237300|2|1|Please note additional 20% applied per overstock promo.|Y
01|237300|2|2|Once PO/order issued these cannot be cancelled or|Y
01|237300|2|3|returned. This will need to be requoted for price &|Y
01|237300|2|4|availbility upon stock depletion.|Y
01|237300|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237300|4|2|placed after September 1st 2025(until further notice).|Y
01|237300|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237300|4|4|of every order.|Y
01|237302|1|1|SN#2243 5AX-201-320-260FA-1PRJ RGA#TAR-62245|Y
01|237302|1|2|Spinick Manufacturing/Spinick Manufacturing|Y
01|237302|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237302|3|2|placed after September 1st 2025(until further notice).|Y
01|237302|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237302|3|4|of every order.|Y
01|237303|14|1|A tariff surcharge of 8% will be added to every order|Y
01|237303|14|2|placed after September 1st 2025(until further notice).|Y
01|237303|14|3|This surcharge will be acknowledged upon acceptance|Y
01|237303|14|4|of every order.|Y
01|237304|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237304|2|2|placed after September 1st 2025(until further notice).|Y
01|237304|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237304|2|4|of every order.|Y
01|237305|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237305|6|2|placed after September 1st 2025(until further notice).|Y
01|237305|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237305|6|4|of every order.|Y
01|237306|2|1|CN322R015C|Y
01|237306|3|1|CN322L014|Y
01|237306|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237306|4|2|placed after September 1st 2025(until further notice).|Y
01|237306|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237306|4|4|of every order.|Y
01|237307|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237307|2|2|placed after September 1st 2025(until further notice).|Y
01|237307|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237307|2|4|of every order.|Y
01|237308|1|1|Quoted at NET pricing|Y
01|237308|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237308|2|2|placed after September 1st 2025(until further notice).|Y
01|237308|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237308|2|4|of every order.|Y
01|237309|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237309|2|2|placed after September 1st 2025(until further notice).|Y
01|237309|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237309|2|4|of every order.|Y
01|237310|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237310|2|2|placed after September 1st 2025(until further notice).|Y
01|237310|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237310|2|4|of every order.|Y
01|237312|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237312|2|2|placed after September 1st 2025(until further notice).|Y
01|237312|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237312|2|4|of every order.|Y
01|237313|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237313|3|2|placed after September 1st 2025(until further notice).|Y
01|237313|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237313|3|4|of every order.|Y
01|237314|2|1|Special external cable to match the Matsuura wiring.|Y
01|237314|4|1|Please Note: Installation is not included with the|Y
01|237314|4|2|price of the rotary tables. Cables ARE included with|Y
01|237314|4|3|the purchase price of the rotary tables. Installation|Y
01|237314|4|4|is quoted at NET price.|Y
01|237315|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237315|4|2|placed after September 1st 2025(until further notice).|Y
01|237315|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237315|4|4|of every order.|Y
01|237316|30|1|A tariff surcharge of 8% will be added to every order|Y
01|237316|30|2|placed after September 1st 2025(until further notice).|Y
01|237316|30|3|This surcharge will be acknowledged upon acceptance|Y
01|237316|30|4|of every order.|Y
01|237317|2|1|A tariff surcharge may be added to this quotation in|Y
01|237317|2|2|the event of a sustained tariff increase on the|Y
01|237317|2|3|importation of this product.  Any surcharge will be|Y
01|237317|2|4|disclosed prior to acceptance of an order.|Y
01|237318|17|1|A tariff surcharge of 8% will be added to every order|Y
01|237318|17|2|placed after September 1st 2025(until further notice).|Y
01|237318|17|3|This surcharge will be acknowledged upon acceptance|Y
01|237318|17|4|of every order.|Y
01|237319|35|1|A tariff surcharge of 8% will be added to every order|Y
01|237319|35|2|placed after September 1st 2025(until further notice).|Y
01|237319|35|3|This surcharge will be acknowledged upon acceptance|Y
01|237319|35|4|of every order.|Y
01|237320|2|1|A tariff surcharge may be added to this quotation in|Y
01|237320|2|2|the event of a sustained tariff increase on the|Y
01|237320|2|3|importation of this product.  Any surcharge will be|Y
01|237320|2|4|disclosed prior to acceptance of an order.|Y
01|237321|4|1|BT50-CZF25-105|Y
01|237321|4|2|BT50 BullsEye ZeroFit Milling Chuck C25 8K|Y
01|237322|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237322|2|2|placed after September 1st 2025(until further notice).|Y
01|237322|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237322|2|4|of every order.|Y
01|237323|1|1|10/Mid for 7+ pcs pricing only valid for this week.|Y
01|237323|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237323|3|2|placed after September 1st 2025(until further notice).|Y
01|237323|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237323|3|4|of every order.|Y
01|237324|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237324|2|2|placed after September 1st 2025(until further notice).|Y
01|237324|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237324|2|4|of every order.|Y
01|237325|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237325|2|2|placed after September 1st 2025(until further notice).|Y
01|237325|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237325|2|4|of every order.|Y
01|237327|1|1|RGA#LVR-62171/|Y
01|237327|1|2|Repair of BMT45-ER25Z-ICE s/n:19904341 05|Y
01|237327|1|3|(Mimatic#192509)|Y
01|237327|2|1|Bearings seals o-rings and threadring to be|Y
01|237327|2|2|replaced.|Y
01|237327|4|1|RGA#LVR-62171/|Y
01|237327|4|2|Repair of BMT45-ER25Z-ICE s/n: 20900967 04|Y
01|237327|4|3|(Mimatic#192509)|Y
01|237327|5|1|Bearings seals and o-rings to be replaced.|Y
01|237327|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237327|6|2|placed after September 1st 2025(until further notice).|Y
01|237327|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237327|6|4|of every order.|Y
01|237328|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237328|7|2|placed after September 1st 2025(until further notice).|Y
01|237328|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237328|7|4|of every order.|Y
01|237329|1|1|Item is non-standard stock.Once a PO has been received|Y
01|237329|1|2|it cannot be cancelled or returned.|Y
01|237329|1|3|Quoted at NET pricing|Y
01|237329|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237329|2|2|placed after September 1st 2025(until further notice).|Y
01|237329|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237329|2|4|of every order.|Y
01|237330|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237330|5|2|placed after September 1st 2025(until further notice).|Y
01|237330|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237330|5|4|of every order.|Y
01|237331|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237331|2|2|placed after September 1st 2025(until further notice).|Y
01|237331|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237331|2|4|of every order.|Y
01|237332|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237332|5|2|placed after September 1st 2025(until further notice).|Y
01|237332|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237332|5|4|of every order.|Y
01|237333|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237333|3|2|placed after September 1st 2025(until further notice).|Y
01|237333|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237333|3|4|of every order.|Y
01|237334|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237334|3|2|placed after September 1st 2025(until further notice).|Y
01|237334|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237334|3|4|of every order.|Y
01|237335|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237335|2|2|placed after September 1st 2025(until further notice).|Y
01|237335|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237335|2|4|of every order.|Y
01|237336|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237336|5|2|placed after September 1st 2025(until further notice).|Y
01|237336|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237336|5|4|of every order.|Y
01|237337|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237337|8|2|placed after September 1st 2025(until further notice).|Y
01|237337|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237337|8|4|of every order.|Y
01|237338|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237338|7|2|placed after September 1st 2025(until further notice).|Y
01|237338|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237338|7|4|of every order.|Y
01|237339|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237339|2|2|placed after September 1st 2025(until further notice).|Y
01|237339|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237339|2|4|of every order.|Y
01|237340|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237340|3|2|placed after September 1st 2025(until further notice).|Y
01|237340|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237340|3|4|of every order.|Y
01|237341|1|1|RGA#LVR-62158/|Y
01|237341|1|2|Repair of MNL12-ER16Y-OFF-MD  s/n:A0058|Y
01|237341|1|3|(Alps#MSA01-63000)|Y
01|237341|2|1|Bearings o-rings nuts and spindles to be replaced.|Y
01|237341|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237341|3|2|placed after September 1st 2025(until further notice).|Y
01|237341|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237341|3|4|of every order.|Y
01|237342|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237342|2|2|placed after September 1st 2025(until further notice).|Y
01|237342|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237342|2|4|of every order.|Y
01|237343|1|1|Please note this is considered non-standard stock. Once|Y
01|237343|1|2|PO/order issued these cannot be cancelled or returned.|Y
01|237343|1|3|1 currently left and upon stock depletion this will|Y
01|237343|1|4|need to be requoted for price & availability.|Y
01|237344|1|1|Base plate for 5AX201-YA-M to Zero Clamp Pneumatic|Y
01|237344|1|2|Self Centering VIse|Y
01|237344|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237344|6|2|placed after September 1st 2025(until further notice).|Y
01|237344|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237344|6|4|of every order.|Y
01|237345|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237345|4|2|placed after September 1st 2025(until further notice).|Y
01|237345|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237345|4|4|of every order.|Y
01|237346|2|1|Please note additional 20% applied per overstock promo.|Y
01|237346|2|2|Once PO/order issued these cannot be cancelled or|Y
01|237346|2|3|returned. This will need to be requoted for price and|Y
01|237346|2|4|availability upon stock depletion.|Y
01|237346|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237346|4|2|placed after September 1st 2025(until further notice).|Y
01|237346|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237346|4|4|of every order.|Y
01|237347|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237347|5|2|placed after September 1st 2025(until further notice).|Y
01|237347|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237347|5|4|of every order.|Y
01|237348|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237348|4|2|placed after September 1st 2025(until further notice).|Y
01|237348|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237348|4|4|of every order.|Y
01|237349|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237349|7|2|placed after September 1st 2025(until further notice).|Y
01|237349|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237349|7|4|of every order.|Y
01|237350|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237350|5|2|placed after September 1st 2025(until further notice).|Y
01|237350|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237350|5|4|of every order.|Y
01|237351|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237351|4|2|placed after September 1st 2025(until further notice).|Y
01|237351|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237351|4|4|of every order.|Y
01|237352|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237352|4|2|placed after September 1st 2025(until further notice).|Y
01|237352|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237352|4|4|of every order.|Y
01|237353|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237353|5|2|placed after September 1st 2025(until further notice).|Y
01|237353|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237353|5|4|of every order.|Y
01|237354|-13|1|A tariff surcharge of 8% will be added to every order|Y
01|237354|-13|2|placed after September 1st 2025(until further notice).|Y
01|237354|-13|3|This surcharge will be acknowledged upon acceptance|Y
01|237354|-13|4|of every order.|Y
01|237355|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237355|2|2|placed after September 1st 2025(until further notice).|Y
01|237355|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237355|2|4|of every order.|Y
01|237356|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237356|2|2|placed after September 1st 2025(until further notice).|Y
01|237356|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237356|2|4|of every order.|Y
01|237357|13|1|A tariff surcharge of 8% will be added to every order|Y
01|237357|13|2|placed after September 1st 2025(until further notice).|Y
01|237357|13|3|This surcharge will be acknowledged upon acceptance|Y
01|237357|13|4|of every order.|Y
01|237358|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237358|3|2|placed after September 1st 2025(until further notice).|Y
01|237358|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237358|3|4|of every order.|Y
01|237359|14|1|A tariff surcharge of 8% will be added to every order|Y
01|237359|14|2|placed after September 1st 2025(until further notice).|Y
01|237359|14|3|This surcharge will be acknowledged upon acceptance|Y
01|237359|14|4|of every order.|Y
01|237361|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237361|4|2|placed after September 1st 2025(until further notice).|Y
01|237361|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237361|4|4|of every order.|Y
01|237362|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237362|4|2|placed after September 1st 2025(until further notice).|Y
01|237362|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237362|4|4|of every order.|Y
01|237363|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237363|2|2|placed after September 1st 2025(until further notice).|Y
01|237363|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237363|2|4|of every order.|Y
01|237364|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237364|2|2|placed after September 1st 2025(until further notice).|Y
01|237364|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237364|2|4|of every order.|Y
01|237365|12|1|A tariff surcharge of 8% will be added to every order|Y
01|237365|12|2|placed after September 1st 2025(until further notice).|Y
01|237365|12|3|This surcharge will be acknowledged upon acceptance|Y
01|237365|12|4|of every order.|Y
01|237366|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237366|7|2|placed after September 1st 2025(until further notice).|Y
01|237366|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237366|7|4|of every order.|Y
01|237367|1|1|RGA#TAR-XXXX|Y
01|237367|1|2|CNC501TFA10+1 SN: XXXX|Y
01|237367|33|1|A tariff surcharge of 8% will be added to every order|Y
01|237367|33|2|placed after September 1st 2025(until further notice).|Y
01|237367|33|3|This surcharge will be acknowledged upon acceptance|Y
01|237367|33|4|of every order.|Y
01|237368|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237368|3|2|placed after September 1st 2025(until further notice).|Y
01|237368|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237368|3|4|of every order.|Y
01|237369|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237369|7|2|placed after September 1st 2025(until further notice).|Y
01|237369|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237369|7|4|of every order.|Y
01|237370|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237370|2|2|placed after September 1st 2025(until further notice).|Y
01|237370|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237370|2|4|of every order.|Y
01|237371|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237371|2|2|placed after September 1st 2025(until further notice).|Y
01|237371|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237371|2|4|of every order.|Y
01|237372|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237372|8|2|placed after September 1st 2025(until further notice).|Y
01|237372|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237372|8|4|of every order.|Y
01|237373|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237373|2|2|placed after September 1st 2025(until further notice).|Y
01|237373|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237373|2|4|of every order.|Y
01|237374|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237374|8|2|placed after September 1st 2025(until further notice).|Y
01|237374|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237374|8|4|of every order.|Y
01|237375|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237375|2|2|placed after September 1st 2025(until further notice).|Y
01|237375|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237375|2|4|of every order.|Y
01|237376|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237376|4|2|placed after September 1st 2025(until further notice).|Y
01|237376|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237376|4|4|of every order.|Y
01|237377|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237377|3|2|placed after September 1st 2025(until further notice).|Y
01|237377|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237377|3|4|of every order.|Y
01|237378|9|1|A tariff surcharge of 8% will be added to every order|Y
01|237378|9|2|placed after September 1st 2025(until further notice).|Y
01|237378|9|3|This surcharge will be acknowledged upon acceptance|Y
01|237378|9|4|of every order.|Y
01|237379|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237379|3|2|placed after September 1st 2025(until further notice).|Y
01|237379|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237379|3|4|of every order.|Y
01|237380|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237380|2|2|placed after September 1st 2025(until further notice).|Y
01|237380|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237380|2|4|of every order.|Y
01|237381|1|1|Inspection / 5AX-1200BFA-RCN2|Y
01|237381|2|1|Travel for 3 hrs for a round trips|Y
01|237381|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237381|7|2|placed after September 1st 2025(until further notice).|Y
01|237381|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237382|1|1|Hwacheon Live tool Right Angle head C5 EC.|Y
01|237383|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237383|2|2|placed after September 1st 2025(until further notice).|Y
01|237383|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237383|2|4|of every order.|Y
01|237384|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237384|4|2|placed after September 1st 2025(until further notice).|Y
01|237384|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237384|4|4|of every order.|Y
01|237385|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237385|4|2|placed after September 1st 2025(until further notice).|Y
01|237385|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237385|4|4|of every order.|Y
01|237386|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237386|2|2|placed after September 1st 2025(until further notice).|Y
01|237386|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237386|2|4|of every order.|Y
01|237387|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237387|8|2|placed after September 1st 2025(until further notice).|Y
01|237387|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237387|8|4|of every order.|Y
01|237388|1|1|1 currently left on the shelf. Please note this is|Y
01|237388|1|2|considered special. Once PO/order issued these cannot|Y
01|237388|1|3|be cancelled or returned.|Y
01|237388|4|1|Please note additional 20% applied per overstock promo.|Y
01|237388|4|2|Once PO/order issued these cannot be cancelled or|Y
01|237388|4|3|returned. These will need to be requoted for price &|Y
01|237388|4|4|availability upon stock depletion.|Y
01|237388|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237388|6|2|placed after September 1st 2025(until further notice).|Y
01|237388|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237388|6|4|of every order.|Y
01|237390|14|1|A tariff surcharge of 8% will be added to every order|Y
01|237390|14|2|placed after September 1st 2025(until further notice).|Y
01|237390|14|3|This surcharge will be acknowledged upon acceptance|Y
01|237390|14|4|of every order.|Y
01|237391|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237391|7|2|placed after September 1st 2025(until further notice).|Y
01|237391|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237391|7|4|of every order.|Y
01|237393|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237393|4|2|placed after September 1st 2025(until further notice).|Y
01|237393|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237393|4|4|of every order.|Y
01|237394|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237394|2|2|placed after September 1st 2025(until further notice).|Y
01|237394|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237394|2|4|of every order.|Y
01|237395|1|1|**Cannot be cancelled or returned after invoicing**|Y
01|237395|4|1|On-site Presetter Installation & Training|Y
01|237395|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237395|5|2|placed after September 1st 2025(until further notice).|Y
01|237395|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237395|5|4|of every order.|Y
01|237396|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237396|3|2|placed after September 1st 2025(until further notice).|Y
01|237396|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237396|3|4|of every order.|Y
01|237397|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237397|2|2|placed after September 1st 2025(until further notice).|Y
01|237397|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237397|2|4|of every order.|Y
01|237398|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237398|3|2|placed after September 1st 2025(until further notice).|Y
01|237398|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237398|3|4|of every order.|Y
01|237399|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237399|2|2|placed after September 1st 2025(until further notice).|Y
01|237399|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237399|2|4|of every order.|Y
01|237400|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237400|3|2|placed after September 1st 2025(until further notice).|Y
01|237400|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237400|3|4|of every order.|Y
01|237401|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237401|2|2|placed after September 1st 2025(until further notice).|Y
01|237401|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237401|2|4|of every order.|Y
01|237403|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237403|2|2|placed after September 1st 2025(until further notice).|Y
01|237403|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237403|2|4|of every order.|Y
01|237404|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237404|3|2|placed after September 1st 2025(until further notice).|Y
01|237404|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237404|3|4|of every order.|Y
01|237405|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237405|2|2|placed after September 1st 2025(until further notice).|Y
01|237405|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237405|2|4|of every order.|Y
01|237406|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237406|2|2|placed after September 1st 2025(until further notice).|Y
01|237406|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237406|2|4|of every order.|Y
01|237407|1|1|C5006-1250-4.00 with 4-Hole DIN.|Y
01|237407|1|2|**NET Price**  **Custom Tool - non-cancellable &|Y
01|237407|1|3|non-returnable**|Y
01|237407|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237407|2|2|placed after September 1st 2025(until further notice).|Y
01|237407|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237407|2|4|of every order.|Y
01|237408|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237408|2|2|placed after September 1st 2025(until further notice).|Y
01|237408|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237408|2|4|of every order.|Y
01|237409|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237409|2|2|placed after September 1st 2025(until further notice).|Y
01|237409|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237409|2|4|of every order.|Y
01|237410|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237410|3|2|placed after September 1st 2025(until further notice).|Y
01|237410|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237410|3|4|of every order.|Y
01|237411|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237411|2|2|placed after September 1st 2025(until further notice).|Y
01|237411|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237411|2|4|of every order.|Y
01|237412|1|1|**Demo Unit - cannot be cancelled or returned after|Y
01|237412|1|2|invoicing**|Y
01|237412|4|1|On-site Presetter Installation & Training|Y
01|237412|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237412|5|2|placed after September 1st 2025(until further notice).|Y
01|237412|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237412|5|4|of every order.|Y
01|237413|1|1|No Inspection Required.|Y
01|237413|2|1|No Inspection Required.|Y
01|237413|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237413|3|2|placed after September 1st 2025(until further notice).|Y
01|237413|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237413|3|4|of every order.|Y
01|237414|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237414|6|2|placed after September 1st 2025(until further notice).|Y
01|237414|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237414|6|4|of every order.|Y
01|237415|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237415|2|2|placed after September 1st 2025(until further notice).|Y
01|237415|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237415|2|4|of every order.|Y
01|237416|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237416|2|2|placed after September 1st 2025(until further notice).|Y
01|237416|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237416|2|4|of every order.|Y
01|237417|2|1|NBT40-SK10C-90-RPNJ|Y
01|237417|2|2|NBT40 2Lock Nano Coolant - Jet SK10 Holder|Y
01|237418|1|1|**Demo Unit - cannot be cancelled or returned after|Y
01|237418|1|2|invoicing**|Y
01|237418|6|1|On-site Presetter Installation & Training|Y
01|237418|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237418|7|2|placed after September 1st 2025(until further notice).|Y
01|237418|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237418|7|4|of every order.|Y
01|237419|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237419|5|2|placed after September 1st 2025(until further notice).|Y
01|237419|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237419|5|4|of every order.|Y
01|237420|2|1|HSK63A-SK10C-90-RPNJ|Y
01|237420|2|2|HSK63A Nano Coolant - Jet SK10 Holder|Y
01|237421|1|1|**Demo Unit - cannot be cancelled or returned after|Y
01|237421|1|2|invoicing**|Y
01|237421|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237421|6|2|placed after September 1st 2025(until further notice).|Y
01|237421|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237421|6|4|of every order.|Y
01|237422|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237422|4|2|placed after September 1st 2025(until further notice).|Y
01|237422|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237422|4|4|of every order.|Y
01|237423|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237423|4|2|placed after September 1st 2025(until further notice).|Y
01|237423|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237423|4|4|of every order.|Y
01|237424|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237424|2|2|placed after September 1st 2025(until further notice).|Y
01|237424|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237424|2|4|of every order.|Y
01|237425|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237425|3|2|placed after September 1st 2025(until further notice).|Y
01|237425|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237425|3|4|of every order.|Y
01|237426|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237426|2|2|placed after September 1st 2025(until further notice).|Y
01|237426|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237426|2|4|of every order.|Y
01|237427|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237427|2|2|placed after September 1st 2025(until further notice).|Y
01|237427|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237427|2|4|of every order.|Y
01|237428|11|1|A tariff surcharge of 8% will be added to every order|Y
01|237428|11|2|placed after September 1st 2025(until further notice).|Y
01|237428|11|3|This surcharge will be acknowledged upon acceptance|Y
01|237428|11|4|of every order.|Y
01|237429|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237429|4|2|placed after September 1st 2025(until further notice).|Y
01|237429|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237429|4|4|of every order.|Y
01|237430|9|1|A tariff surcharge of 8% will be added to every order|Y
01|237430|9|2|placed after September 1st 2025(until further notice).|Y
01|237430|9|3|This surcharge will be acknowledged upon acceptance|Y
01|237430|9|4|of every order.|Y
01|237431|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237431|3|2|placed after September 1st 2025(until further notice).|Y
01|237431|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237431|3|4|of every order.|Y
01|237432|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237432|4|2|placed after September 1st 2025(until further notice).|Y
01|237432|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237432|4|4|of every order.|Y
01|237433|31|1|A tariff surcharge of 8% will be added to every order|Y
01|237433|31|2|placed after September 1st 2025(until further notice).|Y
01|237433|31|3|This surcharge will be acknowledged upon acceptance|Y
01|237433|31|4|of every order.|Y
01|237434|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237434|4|2|placed after September 1st 2025(until further notice).|Y
01|237434|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237434|4|4|of every order.|Y
01|237435|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237435|2|2|placed after September 1st 2025(until further notice).|Y
01|237435|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237435|2|4|of every order.|Y
01|237436|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237436|4|2|placed after September 1st 2025(until further notice).|Y
01|237436|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237436|4|4|of every order.|Y
01|237437|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237437|7|2|placed after September 1st 2025(until further notice).|Y
01|237437|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237437|7|4|of every order.|Y
01|237438|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237438|2|2|placed after September 1st 2025(until further notice).|Y
01|237438|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237438|2|4|of every order.|Y
01|237439|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237439|3|2|placed after September 1st 2025(until further notice).|Y
01|237439|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237439|3|4|of every order.|Y
01|237440|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237440|4|2|placed after September 1st 2025(until further notice).|Y
01|237440|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237440|4|4|of every order.|Y
01|237441|1|1|18pcs 1 week & balance 10-12 weeks|Y
01|237441|10|1|A tariff surcharge of 8% will be added to every order|Y
01|237441|10|2|placed after September 1st 2025(until further notice).|Y
01|237441|10|3|This surcharge will be acknowledged upon acceptance|Y
01|237441|10|4|of every order.|Y
01|237442|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237442|4|2|placed after September 1st 2025(until further notice).|Y
01|237442|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237442|4|4|of every order.|Y
01|237443|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237443|2|2|placed after September 1st 2025(until further notice).|Y
01|237443|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237443|2|4|of every order.|Y
01|237444|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237444|3|2|placed after September 1st 2025(until further notice).|Y
01|237444|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237444|3|4|of every order.|Y
01|237445|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237445|2|2|placed after September 1st 2025(until further notice).|Y
01|237445|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237445|2|4|of every order.|Y
01|237446|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237446|2|2|placed after September 1st 2025(until further notice).|Y
01|237446|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237446|2|4|of every order.|Y
01|237447|3|1|Non-standard stock/cannot be cancelled or returned.|Y
01|237447|3|2|Quoted at NET pricing|Y
01|237447|3|3|Minimum order quantity is 4|Y
01|237447|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237447|4|2|placed after September 1st 2025(until further notice).|Y
01|237447|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237447|4|4|of every order.|Y
01|237448|6|1|HSK100A-NPU8-130|Y
01|237449|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237449|2|2|placed after September 1st 2025(until further notice).|Y
01|237449|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237449|2|4|of every order.|Y
01|237450|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237450|4|2|placed after September 1st 2025(until further notice).|Y
01|237450|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237450|4|4|of every order.|Y
01|237451|11|1|A tariff surcharge of 8% will be added to every order|Y
01|237451|11|2|placed after September 1st 2025(until further notice).|Y
01|237451|11|3|This surcharge will be acknowledged upon acceptance|Y
01|237451|11|4|of every order.|Y
01|237452|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237452|2|2|placed after September 1st 2025(until further notice).|Y
01|237452|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237452|2|4|of every order.|Y
01|237453|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237453|2|2|placed after September 1st 2025(until further notice).|Y
01|237453|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237453|2|4|of every order.|Y
01|237454|1|1|Please note this is non-standard stock and considered|Y
01|237454|1|2|special. Once PO/order issued these can't be cancelled|Y
01|237454|1|3|or returned.|Y
01|237454|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237454|8|2|placed after September 1st 2025(until further notice).|Y
01|237454|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237454|8|4|of every order.|Y
01|237455|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237455|2|2|placed after September 1st 2025(until further notice).|Y
01|237455|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237455|2|4|of every order.|Y
01|237456|2|1|Additional 20% discount for our Overstock Promotion has|Y
01|237456|2|2|been applied to the B4016-1250B.  Once a Purchase Order|Y
01|237456|2|3|has been received this item cannot be cancelled or|Y
01|237456|2|4|returned.  All sales are final.|Y
01|237456|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237456|5|2|placed after September 1st 2025(until further notice).|Y
01|237456|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237456|5|4|of every order.|Y
01|237457|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237457|5|2|placed after September 1st 2025(until further notice).|Y
01|237457|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237457|5|4|of every order.|Y
01|237458|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237458|3|2|placed after September 1st 2025(until further notice).|Y
01|237458|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237458|3|4|of every order.|Y
01|237459|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237459|3|2|placed after September 1st 2025(until further notice).|Y
01|237459|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237459|3|4|of every order.|Y
01|237460|1|1|RGA#TAR-xxxx|Y
01|237460|1|2|CNC501TFA-10+1PRJ|Y
01|237460|1|3|SN:6293|Y
01|237460|1|4|SN:6103|Y
01|237460|1|5|SN:6642|Y
01|237460|1|6|SN:6541|Y
01|237460|1|7|SN:6101|Y
01|237460|1|8|SN:6294|Y
01|237460|11|1|A tariff surcharge of 8% will be added to every order|Y
01|237460|11|2|placed after September 1st 2025(until further notice).|Y
01|237460|11|3|This surcharge will be acknowledged upon acceptance|Y
01|237461|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237461|2|2|placed after September 1st 2025(until further notice).|Y
01|237461|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237461|2|4|of every order.|Y
01|237462|3|1|A tariff surcharge of 8% has been applied to the|Y
01|237462|3|2|List Price of this item for a Purchase Order that will|Y
01|237462|3|3|be placed after 9/1/2025.|Y
01|237463|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237463|2|2|placed after September 1st 2025(until further notice).|Y
01|237463|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237463|2|4|of every order.|Y
01|237464|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237464|2|2|placed after September 1st 2025(until further notice).|Y
01|237464|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237464|2|4|of every order.|Y
01|237466|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237466|6|2|placed after September 1st 2025(until further notice).|Y
01|237466|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237466|6|4|of every order.|Y
01|237467|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237467|2|2|placed after September 1st 2025(until further notice).|Y
01|237467|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237467|2|4|of every order.|Y
01|237468|1|1|For Amon Ra  s/n: 2212|Y
01|237468|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237468|2|2|placed after September 1st 2025(until further notice).|Y
01|237468|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237468|2|4|of every order.|Y
01|237469|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237469|6|2|placed after September 1st 2025(until further notice).|Y
01|237469|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237469|6|4|of every order.|Y
01|237470|35|1|A tariff surcharge of 8% will be added to every order|Y
01|237470|35|2|placed after September 1st 2025(until further notice).|Y
01|237470|35|3|This surcharge will be acknowledged upon acceptance|Y
01|237470|35|4|of every order.|Y
01|237471|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237471|6|2|placed after September 1st 2025(until further notice).|Y
01|237471|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237471|6|4|of every order.|Y
01|237472|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237472|3|2|placed after September 1st 2025(until further notice).|Y
01|237472|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237472|3|4|of every order.|Y
01|237473|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237473|6|2|placed after September 1st 2025(until further notice).|Y
01|237473|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237473|6|4|of every order.|Y
01|237474|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237474|3|2|placed after September 1st 2025(until further notice).|Y
01|237474|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237474|3|4|of every order.|Y
01|237475|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237475|2|2|placed after September 1st 2025(until further notice).|Y
01|237475|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237475|2|4|of every order.|Y
01|237476|1|1|Surcharge included|Y
01|237476|2|1|Surcharge Included|Y
01|237476|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237476|3|2|placed after September 1st 2025(until further notice).|Y
01|237476|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237476|3|4|of every order.|Y
01|237477|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237477|4|2|placed after September 1st 2025(until further notice).|Y
01|237477|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237477|4|4|of every order.|Y
01|237478|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237478|4|2|placed after September 1st 2025(until further notice).|Y
01|237478|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237478|4|4|of every order.|Y
01|237479|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237479|4|2|placed after September 1st 2025(until further notice).|Y
01|237479|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237479|4|4|of every order.|Y
01|237480|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237480|5|2|placed after September 1st 2025(until further notice).|Y
01|237480|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237480|5|4|of every order.|Y
01|237481|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237481|2|2|placed after September 1st 2025(until further notice).|Y
01|237481|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237481|2|4|of every order.|Y
01|237483|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237483|5|2|placed after September 1st 2025(until further notice).|Y
01|237483|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237483|5|4|of every order.|Y
01|237484|10|1|A tariff surcharge of 8% will be added to every order|Y
01|237484|10|2|placed after September 1st 2025(until further notice).|Y
01|237484|10|3|This surcharge will be acknowledged upon acceptance|Y
01|237484|10|4|of every order.|Y
01|237485|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237485|2|2|placed after September 1st 2025(until further notice).|Y
01|237485|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237485|2|4|of every order.|Y
01|237486|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237486|2|2|placed after September 1st 2025(until further notice).|Y
01|237486|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237486|2|4|of every order.|Y
01|237487|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237487|3|2|placed after September 1st 2025(until further notice).|Y
01|237487|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237487|3|4|of every order.|Y
01|237488|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237488|2|2|placed after September 1st 2025(until further notice).|Y
01|237488|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237488|2|4|of every order.|Y
01|237490|9|1|A tariff surcharge of 8% will be added to every order|Y
01|237490|9|2|placed after September 1st 2025(until further notice).|Y
01|237490|9|3|This surcharge will be acknowledged upon acceptance|Y
01|237490|9|4|of every order.|Y
01|237491|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237491|2|2|placed after September 1st 2025(until further notice).|Y
01|237491|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237491|2|4|of every order.|Y
01|237492|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237492|2|2|placed after September 1st 2025(until further notice).|Y
01|237492|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237492|2|4|of every order.|Y
01|237493|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237493|3|2|placed after September 1st 2025(until further notice).|Y
01|237493|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237493|3|4|of every order.|Y
01|237494|2|1|Additional 20% discount has been applied to this item|Y
01|237494|2|2|for our Overstock Promotion.  Once a Purchase Order has|Y
01|237494|2|3|been received this item cannot be cancelled or|Y
01|237494|2|4|returned - all sales are final.|Y
01|237494|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237494|3|2|placed after September 1st 2025(until further notice).|Y
01|237494|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237494|3|4|of every order.|Y
01|237495|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237495|3|2|placed after September 1st 2025(until further notice).|Y
01|237495|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237495|3|4|of every order.|Y
01|237496|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237496|3|2|placed after September 1st 2025(until further notice).|Y
01|237496|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237496|3|4|of every order.|Y
01|237497|75|1|A tariff surcharge of 8% will be added to every order|Y
01|237497|75|2|placed after September 1st 2025(until further notice).|Y
01|237497|75|3|This surcharge will be acknowledged upon acceptance|Y
01|237497|75|4|of every order.|Y
01|237498|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237498|5|2|placed after September 1st 2025(until further notice).|Y
01|237498|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237498|5|4|of every order.|Y
01|237499|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237499|2|2|placed after September 1st 2025(until further notice).|Y
01|237499|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237499|2|4|of every order.|Y
01|237500|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237500|2|2|placed after September 1st 2025(until further notice).|Y
01|237500|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237500|2|4|of every order.|Y
01|237502|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237502|5|2|placed after September 1st 2025(until further notice).|Y
01|237502|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237502|5|4|of every order.|Y
01|237503|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237503|3|2|placed after September 1st 2025(until further notice).|Y
01|237503|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237503|3|4|of every order.|Y
01|237504|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237504|3|2|placed after September 1st 2025(until further notice).|Y
01|237504|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237504|3|4|of every order.|Y
01|237505|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237505|4|2|placed after September 1st 2025(until further notice).|Y
01|237505|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237505|4|4|of every order.|Y
01|237506|10|1|A tariff surcharge of 8% will be added to every order|Y
01|237506|10|2|placed after September 1st 2025(until further notice).|Y
01|237506|10|3|This surcharge will be acknowledged upon acceptance|Y
01|237506|10|4|of every order.|Y
01|237507|4|1|A tariff surcharge of 8% will be added to every order|Y
01|237507|4|2|placed after September 1st 2025(until further notice).|Y
01|237507|4|3|This surcharge will be acknowledged upon acceptance|Y
01|237507|4|4|of every order.|Y
01|237508|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237508|3|2|placed after September 1st 2025(until further notice).|Y
01|237508|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237508|3|4|of every order.|Y
01|237509|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237509|2|2|placed after September 1st 2025(until further notice).|Y
01|237509|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237509|2|4|of every order.|Y
01|237510|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237510|3|2|placed after September 1st 2025(until further notice).|Y
01|237510|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237510|3|4|of every order.|Y
01|237511|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237511|3|2|placed after September 1st 2025(until further notice).|Y
01|237511|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237511|3|4|of every order.|Y
01|237512|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237512|2|2|placed after September 1st 2025(until further notice).|Y
01|237512|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237512|2|4|of every order.|Y
01|237513|5|1|A tariff surcharge of 8% will be added to every order|Y
01|237513|5|2|placed after September 1st 2025(until further notice).|Y
01|237513|5|3|This surcharge will be acknowledged upon acceptance|Y
01|237513|5|4|of every order.|Y
01|237514|1|1|RGA#LVR-62199/|Y
01|237514|1|2|Repair of MSL12-CT40 s/n:unknown (Alps#T32332)|Y
01|237514|2|1|Bearings o-rings and nuts to be replaced.|Y
01|237514|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237514|3|2|placed after September 1st 2025(until further notice).|Y
01|237514|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237514|3|4|of every order.|Y
01|237515|1|1|RGA#CUR-62175/|Y
01|237515|1|2|Repair of MRAM-EXT-100 s/n:46887 03 (Mimatic#162758)|Y
01|237515|2|1|Bearings seals o-rings and damaged thredring to be|Y
01|237515|2|2|replaced.|Y
01|237515|3|1|A tariff surcharge of 8% will be added to every order|Y
01|237515|3|2|placed after September 1st 2025(until further notice).|Y
01|237515|3|3|This surcharge will be acknowledged upon acceptance|Y
01|237515|3|4|of every order.|Y
01|237516|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237516|2|2|placed after September 1st 2025(until further notice).|Y
01|237516|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237516|2|4|of every order.|Y
01|237517|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237517|2|2|placed after September 1st 2025(until further notice).|Y
01|237517|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237517|2|4|of every order.|Y
01|237518|8|1|A tariff surcharge of 8% will be added to every order|Y
01|237518|8|2|placed after September 1st 2025(until further notice).|Y
01|237518|8|3|This surcharge will be acknowledged upon acceptance|Y
01|237518|8|4|of every order.|Y
01|237519|9|1|A tariff surcharge of 8% will be added to every order|Y
01|237519|9|2|placed after September 1st 2025(until further notice).|Y
01|237519|9|3|This surcharge will be acknowledged upon acceptance|Y
01|237519|9|4|of every order.|Y
01|237520|7|1|A tariff surcharge of 8% will be added to every order|Y
01|237520|7|2|placed after September 1st 2025(until further notice).|Y
01|237520|7|3|This surcharge will be acknowledged upon acceptance|Y
01|237520|7|4|of every order.|Y
01|237521|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237521|2|2|placed after September 1st 2025(until further notice).|Y
01|237521|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237521|2|4|of every order.|Y
01|237522|6|1|A tariff surcharge of 8% will be added to every order|Y
01|237522|6|2|placed after September 1st 2025(until further notice).|Y
01|237522|6|3|This surcharge will be acknowledged upon acceptance|Y
01|237522|6|4|of every order.|Y
01|237539|1|1|Quoted at net price minimum order quantity is|Y
01|237539|1|2|3 holders. Delivery 12~13 Weeks ARO.|Y
01|237569|2|1|*Quoted at NET price DIN modification done in-house|Y
01|237569|2|2|with 2-week lead time. Non-returnable special.|Y
01|237575|1|1|**non-cancellable non-returnable special**|Y
01|237575|2|1|**non-cancellable non-returnable special**|Y
01|237576|1|1|Please allow 12 weeks for manufacturing & delivery|Y
01|237576|1|2|time upon receipt of signed approval drawing. These|Y
01|237576|1|3|are considered special and have been quoted at special|Y
01|237576|1|4|net price. Once PO/order issued these cannot be|Y
01|237576|1|5|cancelled or returned.|Y
01|237577|13|1|A tariff surcharge of 8% will be added to every order|Y
01|237577|13|2|placed after September 1st 2025(until further notice).|Y
01|237577|13|3|This surcharge will be acknowledged upon acceptance|Y
01|237577|13|4|of every order.|Y
01|237584|10|1|C3 Axial Live Tool External Coolant MOQ: 2units|Y
01|237584|11|1|C3 Axial Live Tool INT/EXT Coolant MOQ: 4units|Y
01|237603|5|1|THIS LINE ITEM IS A PLACE HOLDER FOR 3 INDVIDUAL|Y
01|237603|5|2|BRACKETS ONLY - NOT A SET.  ZC PN 42270|Y
01|237603|5|3|POSSIBLE LN PN: EZCOB-ACC-BRCK-BLNK|Y
01|237603|6|1|SERVO DRIVEN AUTO DOOR.|Y
01|237603|6|2|TOUCH SCREEN CONTROL PANEL|Y
01|237603|6|3|INTERFACE CABLE|Y
01|237603|6|4|MOUNTING BRACKET KIT|Y
01|237603|7|1|INSTALL OF AUTODOOR.|Y
01|237603|7|2|TRAVEL EXPENSES + PERDIEM RATES FOR ONSITE INSTALL|Y
01|237603|9|1|BASE PLATE FOR 5AX-201OSP4-M TO WH-ZV-P160|Y
01|237608|12|1|Item is special non-standard stock.  Once a Purchase|Y
01|237608|12|2|Order has been received this item cannot be cancelled|Y
01|237608|12|3|or returned.  Estimated lead time is 1~2 weeks after|Y
01|237608|12|4|receipt of an order.|Y
01|237618|2|1|Lyndex-Nikken to make positioning block upon receipt of|Y
01|237618|2|2|spindle drawing.|Y
01|237626|1|1|No Inspection Required|Y
01|237633|1|1|HSK32E shrink fit 1/4 with 4 gage length.|Y
01|237633|7|1|HSK32E shrink fit 3/8 with 4 gage length.|Y
01|237633|13|1|HSK32E shrink fit 4mm with 100mm gage length.|Y
01|237635|1|1|*Additional 20% Overstock Promo discount applied*|Y
01|237635|1|2|This item is non-cancellable & non-returnable|Y
01|237639|1|1|No Inspection Required|Y
01|237640|1|1|Special non-standard stock. Cannot be cancelled or|Y
01|237640|1|2|returned upon receipt of a PO.|Y
01|237640|7|1|*Special non-standard stock. Cannot be cancelled or|Y
01|237640|7|2|returned upon receipt of a PO.|Y
01|237651|1|1|Currently twelve (12) in stock.  Estimated lead time|Y
01|237651|1|2|on the balance is early October.|Y
01|237651|10|1|Uses the 016-SPAN wrench listed on Line #2.|Y
01|237651|11|1|Uses the 9HC16 wrench listed on Line # 4.|Y
01|237659|1|1|Estimated lead time is 1~2 weeks after receipt of an|Y
01|237659|1|2|order.|Y
01|237663|1|1|DELIVERY: 1pc STOCK 3pc ETA 9/18 Balance ETA 12/19|Y
01|237665|2|1|A tariff surcharge of 8% will be added to every order|Y
01|237665|2|2|placed after September 1st 2025(until further notice).|Y
01|237665|2|3|This surcharge will be acknowledged upon acceptance|Y
01|237665|2|4|of every order.|Y
01|237671|1|1|RGA#LVR-62211/|Y
01|237671|1|2|Repair of MZQT46-ER25Z-MS S/N:51134 02 (Mim#124649)|Y
01|237671|2|1|Bearings seals and o-rings to be replaced|Y
01|237672|1|1|Delivery:|Y
01|237672|1|2|6 pcs in Stock.|Y
01|237672|1|3|+3 pcs: 3-4 Weeks|Y
01|237672|1|4|+3-4 additional pcs: Mid-November unless ordered|Y
01|237672|1|5|by 9/10. If before then delivery will be Mid-October.|Y
01|237674|15|1|MNL12-C4Z-MS-10K Mori BMT60 Live PSC C4 Z<Axial>90D|Y
01|237674|15|2|MainSub ExtCool Center Height 90mm.|Y
01|237674|15|3|Please Note: Delivery is based upon receipt of order|Y
01|237674|15|4|after we receive a signed approval drawing from your|Y
01|237674|15|5|customer. This tool is Special once a purchase order|Y
01|237674|15|6|is placed it cannot be cancelled or returned.|Y
01|237674|15|7|Lyndex-Nikken to supply an approval drawing.|Y
01|237675|5|1|SHOULD BE AT MISCHIEF ON CONSIGNMENT|Y
01|237675|7|1|10MM ADAPTER PLATE U500 - P80Z|Y
01|237675|8|1|INCLUDES UNBOXING ACCURATE PLACEMENT SPEC FROM LAYOUT|Y
01|237675|8|2|DRAWING TRAVEL EXPENSES TRAINING MISC ETC|Y
01|237675|8|3|AUTO DOOR FROM YAMAZEN - LN CAN QUOTE IF NEEDED|Y
01|237675|8|4|ROTARY UNION NEEDS TO BE INSTALLED BY YAMAZEN|Y
01|237676|1|1|Includes power and feedback cables from Nikken Table|Y
01|237676|1|2|to the Machine Bulkhead|Y
01|237680|1|1|**Special - Cannot be cancelled or returned upon|Y
01|237680|1|2|receipt of a PO|Y
01|237681|1|1|HOWA# H09M9 Y-3405 For TAKISAWA|Y
01|237681|2|1|HOWA# H09M9 K-259 For SHOUN Machine|Y
01|237682|1|1|HSK63E-SM22-100|Y
01|237682|2|1|HSK63E-SM32-100|Y
01|237682|3|1|HSK63E-SM22-210|Y
01|237682|4|1|HSK63E-SM22-100|Y
01|237682|5|1|HSK63E-SM32-100|Y
01|237682|6|1|HSK63E-SM22-210|Y
01|237682|7|1|HSK63E-SM22-100|Y
01|237682|8|1|HSK63E-SM32-100|Y
01|237682|9|1|HSK63E-SM22-210|Y
01|237684|2|1|METHODS IS REQUESTING STEEL BRAIDED COVERED CABLES|Y
01|237684|2|2|STANDARD IS POLY COATED CABLES|Y
01|237684|4|1|OPTIONAL ROTARY JOINT FOR THRU-SPINDLE AIR/HYD|Y
01|237696|7|1|SPECIAL POSITIONING BLOCK FOR NIIGATA|Y
01|237711|1|1|Estimated lead time is end of September/beginning of|Y
01|237711|1|2|October.|Y
01|237721|1|1|Mimatic # 196446 ER25 1:1 12000rpm max ICE 2000psi|Y
01|237721|1|2|Center Distance 60mm|Y
01|237721|2|1|Mimatic #196452 ER16 1:1 12000rpm External Coolant|Y
01|237721|3|1|Mimatic # 196452|Y
01|237732|2|1|A tariff surcharge may be added to this quotation in|Y
01|237732|2|2|the event of a sustained tariff increase on the|Y
01|237732|2|3|importation of this product.  Any surcharge will be|Y
01|237732|2|4|disclosed prior to acceptance of an order.|Y
01|237737|41|1|CAT40 bolts x 5 for holder to stand on plates|Y
01|237737|42|1|BT30 bolts x 2 for holder to stand on plates|Y
01|237737|43|1|20or 24 of tablet or TV monitor with stand|Y
01|237737|44|1|Extension cable (15' or Longer)|Y
01|237737|45|1|Catalog stand - flyers slide in type. Upright stand|Y
01|237737|46|1|CAT40 Ring for holder to stand|Y
01|237737|47|1|BT30 Ring for holder to stand|Y
01|237737|48|1|Sets of Gloves|Y
01|237737|49|1|WD40|Y
01|237741|1|1|Quoted at NET price / DIN 4 Holes|Y
01|237754|1|1|Quoted at NET pricing|Y
01|237754|2|1|Quoted at NEt price|Y
01|237758|1|1|MS100-52100 is for T32290|Y
01|237758|2|1|MS100-53100 is for T32291|Y
01|237768|1|1|Quoted at NET Pricing.  Estimated delivery time is|Y
01|237768|1|2|12~14 weeks after receipt of an order.  This item is|Y
01|237768|1|3|special non-standard stock.  Once a Purchase Order has|Y
01|237768|1|4|been received this item cannot be cancelled or|Y
01|237768|1|5|returned.|Y
01|237774|2|1|Installation will be determined at time of purchase|Y
01|237783|7|1|*For SK16 Holder|Y
01|237783|8|1|*For 3/4 Milling Chuck|Y
01|237785|1|1|Added 5% to help with resale|Y
01|237785|1|2|EU Ship to required at time of order|Y
01|237785|1|3|Will machine model and spindle drawings to|Y
01|237785|1|4|produce stop block assembly.|Y
01|237785|2|1|Required for angle head. Price includes mfg. of|Y
01|237785|2|2|custom stop block assembly.|Y
01|237785|2|3|Engineering approval / Customer acceptance required|Y
01|237789|1|1|FOR DNM750/50 FANUC OI-MF+|Y
01|237789|1|2|DATA SHEETS REQUIRED AT TIME OF ORDER|Y
01|237799|1|1|part# PROMO-SK16-KIT-BT40|Y
01|237799|1|2|Includes: 1x BT40-SK16-60 holder|Y
01|237799|1|3|1x SK16-3/8A SK16-1/2A SK16-5/8A collets|Y
01|237799|1|4|1x 9HC16 wrench|Y
01|237799|1|5|*Promo price applied|Y
01|237799|2|1|part# PROMO-SK16-KIT-NBT40|Y
01|237799|2|2|Includes: 1x NBT40-SK16C-60 holder|Y
01|237799|2|3|1x SK16-3/8A SK16-1/2A SK16-5/8A collets|Y
01|237799|2|4|1x 9HC16 wrench|Y
01|237799|2|5|*Promo price applied|Y
01|237807|1|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|237807|2|1|Req.INS/Install E20-NUT & ER20-SCREW(C)|Y
01|237807|3|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|237807|4|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|237857|3|1|C50RAM-INSTALLATION:|Y
01|237857|3|2|Install of block angle head & orientation|Y
01|237871|1|1|SN#10026H CNCZ202 RGA#TAR-62202|Y
01|237871|1|2|Sycramore Precision|Y
01|237873|1|1|TRI-UB5AXMCZ4035SET8|Y
01|237873|7|1|TRI-TK140130|Y
01|237887|1|1|Additional 20% Overstock Promo discount applied.|Y
01|237887|1|2|**non-cancellable non-returnable**|Y
01|237897|1|1|Includes key to match Haas machine table.|Y
01|237897|2|1|Includes guide key to match Haas machine table.|Y
01|237901|1|1|P/N: TBD  Dual Contact CAT50 ER16 collet chuck with|Y
01|237901|1|2|4.12 gauge length.  To be modified to remove round|Y
01|237901|1|3|smooth nut and add hex nut.|Y
01|237901|1|4|Ship 4 1-2 days; ship 12 9/24|Y
01|237906|5|1|Please note these are considered special and have been|Y
01|237906|5|2|quoted at special net price. Once PO/order issued|Y
01|237906|5|3|these cannot be cancelled or returned.|Y
01|237906|16|1|Please note additional 20% applied per over overstock|Y
01|237906|16|2|promo. Once PO/order issued these cannot be cancelled|Y
01|237906|16|3|or returned. These will need to be requote for price &|Y
01|237906|16|4|availability upon stock depletion.|Y
01|237906|21|1|Please note additional 20% applied per over overstock|Y
01|237906|21|2|promo. Once PO/order issued these cannot be cancelled|Y
01|237906|21|3|or returned. These will need to be requote for price &|Y
01|237906|21|4|availability upon stock depletion.|Y
01|237906|30|1|Please note additional 20% applied per over overstock|Y
01|237906|30|2|promo. Once PO/order issued these cannot be cancelled|Y
01|237906|30|3|or returned. These will need to be requote for price &|Y
01|237906|30|4|availability upon stock depletion.|Y
01|237906|33|1|Please note additional 20% applied per over overstock|Y
01|237906|33|2|promo. Once PO/order issued these cannot be cancelled|Y
01|237906|33|3|or returned. These will need to be requote for price &|Y
01|237906|33|4|availability upon stock depletion.|Y
01|237907|1|1|Calibration for E346Plus|Y
01|237921|1|1|HSK63F-SM27-4.50 Shell Mill Holder 27mm x 4.50 gage|Y
01|237921|1|2|length.|Y
01|237921|1|3|Without Antivibration Carbide Rod|Y
01|237921|4|1|HSK63F Shell Mill Holder 27mm 4.50 gage length|Y
01|237921|4|2|With Antivibration Carbide Rod|Y
01|237925|1|1|RGA#LVR-62186/|Y
01|237925|1|2|Repair of MNL12-ER40Z-ICE-10K  s/n:18901158 06|Y
01|237925|1|3|(Mimatic#124882)|Y
01|237925|2|1|Bearings seals and o-rings to be replaced.|Y
01|237929|3|1|QUANTITY BREAK NET PRICING:|Y
01|237929|3|2|2-3pc: $XXXXX ea/net|Y
01|237929|3|3|4-5pc: $XXXXX ea/net|Y
01|237929|3|4|6 +pc: $XXXXX ea/net|Y
01|237936|1|1|C5001-0750-8.00CP-DIN-M|Y
01|237937|1|1|Extended additional 10% off overstock|Y
01|237938|1|1|TRI-1126-D3 custom MODIFIED TRIAG LINEAR CLAMP|Y
01|237943|1|1|Currently one (1) in stock estimated lead time for|N
01|237943|1|2|the balance of one (1) is beginning of December.|N
01|237948|9|1|Quoted at NET price.|Y
01|237948|10|1|A tariff surcharge of 8% will be added to every order|Y
01|237948|10|2|placed after September 1st 2025(until further notice).|Y
01|237948|10|3|This surcharge will be acknowledged upon acceptance|Y
01|237948|10|4|of every order.|Y
01|237976|5|1|The install date will be determined at the time of PO|Y
01|237976|7|1|1525300- 15 3 jaw Setrite self-centering manual chuck|Y
01|237976|7|2|1505CNC401A Adapter Plate to fit 15 Setrite|Y
01|237977|1|1|NBT30-SK6C-150P|Y
01|237977|2|1|NBT30-SK6C-150P NBT30 DualContact Slim Chuck SK6|Y
01|237977|2|2|Coolant HiSpeed 30K|Y
01|237995|1|1|used item from warehouse 2|N
01|237995|2|1|use item from lobby|N
01|237995|3|1|used item from lobby|N
01|237995|4|1|used item from cabinet of service/inspection room|N
01|237997|2|1|Part Number: KSO-G02-2BA-30N-CLE|Y
01|237997|2|2|Hydraulic Solenoid Valve|Y
01|238008|1|1|RGA#QUA-62244/|Y
01|238008|1|2|Repair of NCAT40-MMC8C-90U-AA-IDU|Y
01|238044|5|1|HSK50A-6-80 End mill Holder|Y
01|238044|6|1|HSK50A-20-100 End mill Holder|Y
01|238048|2|1|Additional 20% Overstock Promo discount applied.|Y
01|238048|2|2|**cannot be cancelled or returned**|Y
01|238048|3|1|**Applicable to N3007-0100-2.75 only**|Y
01|238053|1|1|Currently have three (3) in stock at the factory.|Y
01|238054|2|1|LN to make block upon receipt of spindle specs needed|Y
01|238054|2|2|for design.|Y
01|238054|2|3|**NET PRICE - cannot be cancelled or returned**|Y
01|238077|15|1|Estimated lead time will be 1~2 weeks after receipt of|Y
01|238077|15|2|an order as we currently have stock at the factory to|Y
01|238077|15|3|cover the 59 requested.|Y
01|238077|15|4|SEE NERP NOTES|N
01|238082|1|1|**NET Price** Special - cannot be cancelled or returned|Y
01|238082|1|2|upon receipt of PO|Y
01|238082|1|3|**Minimum Order Quantity 2 pcs**|Y
01|238098|8|1|Promotion for OVERSTOCK discount applies to|Y
01|238098|8|2|Line 235 and 6 only.|Y
01|238102|1|1|HSK100A-FMH22-60-250|Y
01|238111|1|1|The pricing does not include customization of the face|Y
01|238111|1|2|plate.|Y
01|238111|1|3|The delivery is 16-20 weeks upon the receipts of signed|Y
01|238111|1|4|approval drawing.|Y
01|238111|1|5|Motor not included.|Y
01|238122|2|1|SPECIAL NET TO ASSIST IN PREMATURE TOOL FAILURES|Y
01|238122|2|2|1 OUT OF 2 CANNOT BE REPAIRED.|Y
01|238122|2|3|SPOKE W/ NATHAN TO OFFER SPECIAL NET ON REPLACEMENTS|Y
01|238122|2|4|TO ELIMINATE ANY POTENTIAL DOUBT THAT THE TOOLS|Y
01|238122|2|5|WERE PROBLEMATIC. -DANA|Y
01|238123|7|1|If the installation is purcahsed the external cables|Y
01|238123|7|2|are included|Y
01|238128|1|1|**NET Price includes chip BIS-C-122-04/L and install/|Y
01|238128|1|2|rebalance fee.|Y
01|238128|1|3|**Customer to provide SECO CAT50ADB-EM0.750-2.500|Y
01|238128|1|4|holder for installation.|Y
01|238130|5|1|2pcs Stock - 9pcs 2 weeks & balance 1pc pending|Y
01|238131|1|1|C5001-0750-8.00CP-DIN-M - CAT50 3/4 Shell Mill Holder|Y
01|238131|1|2|w/ 8 Gage Length.|Y
01|238131|1|3|Standard with coolant ports (exit ports for coolant on|Y
01|238131|1|4|shell mill)-*modified with DIN coolant through the|Y
01|238131|1|5|flange holes...DIN holes are not pluggable*|Y
01|238131|3|1|CAT50-SF10-160CP-DIN-M - CAT50 10mm Shrink Fit Holder|Y
01|238131|3|2|w/ 160mm Gage Length.|Y
01|238131|3|3|Standard with pluggable coolant ports (exit ports for|Y
01|238131|3|4|coolant from ID)-*modified with DIN coolant through the|Y
01|238131|3|5|flange holes...DIN holes are not pluggable*|Y
01|238131|5|1|CAT50-SF20-160CP-DIN-M - CAT50 20mm Shrink Fit Holder|Y
01|238131|5|2|w/ 160mm Gage Length.|Y
01|238131|5|3|Standard with pluggable coolant ports (exit ports for|Y
01|238131|5|4|coolant from ID)-*modified with DIN coolant through the|Y
01|238131|5|5|flange holes...DIN holes are not pluggable*|Y
01|238136|1|1|Estimated lead time is end of September.|Y
01|238139|1|1|TNKQ2509-0382 0012|Y
01|238149|1|1|External cables included|Y
01|238154|1|1|**Special - non-cancellable non-returnable item**|Y
01|238155|1|1|Please note these are considered special stock. Once PO|Y
01|238155|1|2|or order is issued these cannot be cancelled or|Y
01|238155|1|3|returned.|Y
01|238155|3|1|Please note these are considered special stock. Once PO|Y
01|238155|3|2|or order is issued these cannot be cancelled or|Y
01|238155|3|3|returned.|Y
01|238157|1|1|1st Batch 6/20KC:DWG saved in Teams File FW'd to Tim|Y
01|238160|1|1|EJ16-6-21|Y
01|238160|2|1|EJ16-8-28|Y
01|238160|3|1|EJ16-11-40|Y
01|238160|4|1|EJ16-16-50|Y
01|238163|4|1|Curently three (3) in stock in Illinois.  Estimated|Y
01|238163|4|2|lead time for balance of three will be 2~3 weeks after|Y
01|238163|4|3|receipt of an order.|Y
01|238170|2|1|PUMP FOR BRAKE SYSTEM ON CNC802 AND CNC601 SUPPORT|Y
01|238170|2|2|TABLE. UNIT HAS ONE OPEN STACK THAT CAN BE USED|Y
01|238170|2|3|FOR OTHER HYDRAULIC APPLICATIONS|Y
01|238170|3|1|CNC601 BODY TO BE USED FOR SUPPORT TABLE|Y
01|238170|3|2|NO WORM SCREW OR MOTOR INSIDE|Y
01|238180|4|1|A tariff surcharge of 8% will be added to every order|Y
01|238180|4|2|placed after September 1st 2025(until further notice).|Y
01|238180|4|3|This surcharge will be acknowledged upon acceptance|Y
01|238180|4|4|of every order.|Y
01|238183|2|1|Please note additional 20% applied per overstock promo.|Y
01|238183|2|2|Once PO/order is issued these cannot be cancelled or|Y
01|238183|2|3|returned. These will need to be requoted for price &|Y
01|238183|2|4|availabilty upon stock depletion.|Y
01|238185|20|1|Currently five (5) in stock.|Y
01|238185|25|1|Estimated lead time is 2~3 weeks.|Y
01|238187|2|1|Please note additional 20% applied per overstock promo.|Y
01|238187|2|2|Once PO/order issued these cannot be cancelled or|Y
01|238187|2|3|returned. These will need to be requoted for price &|Y
01|238187|2|4|availability upon stock depletion.|Y
01|238188|8|1|HSK63A ERll Collet Chuck MiniNut ChipHole GL 100mm|Y
01|238193|1|1|20% Overstock Promo Applied - cannot be cancelled|Y
01|238193|1|2|or returned|Y
01|238204|10|1|A tariff surcharge of 8% will be added to every order|Y
01|238204|10|2|placed after September 1st 2025(until further notice).|Y
01|238204|10|3|This surcharge will be acknowledged upon acceptance|Y
01|238204|10|4|of every order.|Y
01|238210|1|1|RGA#TAR-62266|Y
01|238210|1|2|CNCZ180LSA-BR2|Y
01|238210|1|3|SN: 25183T|Y
01|238227|3|1|Big Bore Chuck 12 thru hole|Y
01|238228|1|1|Part Number: TBD Similar to Mimatic#A170423 but 60Deg|Y
01|238228|1|2|Mimatic driven live tool for Mazak Series QT-45(12Sta)|Y
01|238228|1|3|VDI50 Shank Drive: Double-Sided SW=12mm. Modular MI63|Y
01|238228|1|4|Holder sold separately. Internal Coolant thru-spindle|Y
01|238228|1|5|external via spray pipe. *Reerse rotation(drive direct.|Y
01|238228|1|6|does not equal output direction) L1=App. 130mm|Y
01|238228|1|7|i(n1/n2)=app. 1:1(Design Orientated) Max Torque M(max)=|Y
01|238228|1|8|100Nm Max. Speed n1(max)=6500rpm n2(max)=6500rpm|Y
01|238228|1|9|Delivery: Dwg 6-8 Weeks Manufacturing 10-11 Weeks.|Y
01|238228|1|10|Manufacturing will not begin until signed approval dwg.|Y
01|238245|2|1|Travel time airfare rental car hotel and meals.|Y
01|238245|3|1|Includes: Airfare rental car hotel and meals|Y
01|238255|2|1|LN to make block after receipt of spindle measurements|Y
01|238258|1|1|Ramstar Part #SR6.2-C16-121|Y
01|238258|1|2|Quoted at NET price each.|Y
01|238270|1|1|SN#5124 MODEL#5AX-201 RGA#TAR-62194 Brunner & Lay Inc.|Y
01|238270|48|1|Recommended part- up to customer|Y
01|238270|49|1|Recommended part- up to customer|Y
01|238280|1|1|Estimated lead time is 6~7 weeks after receipt of an|Y
01|238280|1|2|order.|Y
01|238281|1|1|Includes Power and feed back cables to machine bulkhead|Y
01|238281|2|1|Includes power and feedback cables to machine bulkhead|Y
01|238286|2|1|Please note additional 20% applied per overstock promo.|Y
01|238286|2|2|Once PO/order issued these cannot be cancelled or|Y
01|238286|2|3|returned. These will need to be requoted for price &|Y
01|238286|2|4|availability upon stock depletion.|Y
01|238287|1|1|**NET PRICE**|Y
01|238287|1|2|Delivery: Please allow 1-2 Wks for design. Mfg + Ship|Y
01|238287|1|3|is 6-8 Wks after approval drawing is signed by the|Y
01|238287|1|4|customer.|Y
01|238287|2|1|LN to make block after receipt of spindle specs|Y
01|238287|2|2|necessary for design.|Y
01|238291|1|1|Price includes wrenches and case.|Y
01|238311|1|1|used item from warehouse 2|N
01|238311|3|1|used item from lobby|N
01|238311|4|1|used item from cabinet of service/inspection room|N
01|238319|1|1|RGA#TAR-62243|Y
01|238319|1|2|CNCZ302FA|Y
01|238319|1|3|SN: 7007|Y
01|238321|1|1|Delivery:|Y
01|238321|1|2|1 pc: 6-8 Weeks|Y
01|238321|1|3|2 pcs: 1 pc 6-8 Weeks 2nd pc 10-11 Weeks|Y
01|238321|1|4|Quantity Breaks:|Y
01|238321|1|5|1 pc: $16998/EA|Y
01|238321|1|6|2 pcs: $15488/EA|Y
01|238332|1|1|RGA#LVR-62201/|Y
01|238332|1|2|Repair of MZMP5-ER25-ADJ S/N:22904052 01 (Mim#131612)|Y
01|238332|2|1|Bearing seals and o-rings need to be replaced|Y
01|238362|1|1|Cables included.|Y
01|238362|3|1|see below workholding|Y
01|238362|3|2|1525300- 15 3 jaw Setrite self-centering manual chuck|Y
01|238362|3|3|1505CNC401A Adapter Plate to fit 15 Setrite|Y
01|238371|9|1|A tariff surcharge of 8% will be added to every order|Y
01|238371|9|2|placed after September 1st 2025(until further notice).|Y
01|238371|9|3|This surcharge will be acknowledged upon acceptance|Y
01|238371|9|4|of every order.|Y
01|238373|1|1|**Demo Unit - cannot be cancelled or returned after|Y
01|238373|1|2|invoicing**|Y
01|238373|4|1|**non-cancellable non-returnable**|Y
01|238376|1|1|Right-hand-version|Y
01|238376|1|2|Shank-HSK63-DIN69893/A|Y
01|238376|1|3|Tool Interface milling-arbor-Dia=32 mm|Y
01|238376|1|4|Without coolant|Y
01|238376|1|5|Direction of rotation not reversal|Y
01|238376|1|6|Central offset|Y
01|238376|1|7|L1= 255mm|Y
01|238376|1|8|Weight: app. 15kg  (with aluminium housing)|Y
01|238377|1|1|RGA#LVR-62146/|Y
01|238377|1|2|Repair of MZQT47-ER32Z-ICE s/n: 23902561 01|Y
01|238377|1|3|(Mimatic#124873)|Y
01|238377|2|1|Realign/adjust tool to factory centerline|Y
01|238377|3|1|A tariff surcharge of 8% will be added to every order|Y
01|238377|3|2|placed after September 1st 2025(until further notice).|Y
01|238377|3|3|This surcharge will be acknowledged upon acceptance|Y
01|238377|3|4|of every order.|Y
01|238378|1|1|RGA#TAR-62274|Y
01|238378|1|2|TAT-170N|Y
01|238378|1|3|SN: 42055B|Y
01|238390|1|1|May need 4|N
01|238390|2|1|May need 4|N
01|238393|1|1|SN:5085 Turbocam|Y
01|238393|1|2|RGA#TAR-62273 5AX-201|Y
01|238400|1|1|FOR DN MYNX 6500/50II FANUC Oi-MF|Y
01|238400|1|2|MOUNT ON RIGHT HAND SIDE TILT AXIS PARALLEL TO Y-AXIS|Y
01|238400|1|3|ADD 2 PAIR OF FACEPLATE DRIVE KEYS FOR M120A VISE|Y
01|238400|1|4|-ASK TIM REEVES FOR THESE.|Y
01|238400|2|1|INCLUDES MOTOR STARTER/CIRCUIT BREAKER 24VDC|Y
01|238400|3|1|NEED 2 PAIRS OF STEPPED KEYS FOR INSTALLATION ON RT|Y
01|238400|3|2|FACEPLATE.  SEE TIM REEVES|Y
01|238400|6|1|WH-ZV120-JAWS-M183-STEEL SPECIAL JAW SET|Y
01|238400|6|2|LARGE BLANKS PER CUSTOMER APPROVAL|Y
01|238400|6|3|approval drawing reqr'd. -danas|N
01|238400|6|4|Tim Reeves / Steven M. to mfg or send out to HME|N
01|238402|1|1|HSK32A Blank Bar OD25 GL 150 mm|Y
01|238402|2|1|Hsk32A Blank Bar OD32 GL 100mm|Y
01|238402|3|1|Hsk32A Blank Bar OD40 GL 120mm|Y
01|238461|3|1|*To be completed upon receipt of PO with completed|Y
01|238461|3|2|Lathe Spindle Information Form.|Y
01|238462|1|1|Murata MT200 Live Tool Radial X Live tool C4|Y
01|238462|2|1| Murata MT200 Live Tool Radial X Live tool C4|Y
01|238463|1|1|**Cannot be cancelled or returned after invoicing**|Y
01|238470|1|1|RGA#LVR-62206/|Y
01|238470|1|2|Repair of MZMP5-ER40X-OFF-ICE S/N:2290134303 Mim#189966|Y
01|238470|2|1|Bearings seals and o-rings to be replaced|Y
01|238473|1|1|RGA#LVR-62208/|Y
01|238473|1|2|Repair of MZMP5-ER40X-OFF-ICE S/N:1890030605 Mim#189966|Y
01|238473|2|1|Bearings seals and o-rings to be replaced|Y
01|238497|10|1|A tariff surcharge may be added to this quotation in|Y
01|238497|10|2|the event of a sustained tariff increase on the|Y
01|238497|10|3|importation of this product.  Any surcharge will be|Y
01|238497|10|4|disclosed prior to acceptance of an order.|Y
01|238515|1|1|**Special non-standard item - cannot be cancelled or|Y
01|238515|1|2|returned upon receipt of PO**|Y
01|238518|1|1|SN:3617 Turbocam|Y
01|238518|1|2|RGA#TAR-62273 5AX-201|Y
01|238522|3|1|A tariff surcharge may be added to this quotation in|Y
01|238522|3|2|the event of a sustained tariff increase on the|Y
01|238522|3|3|importation of this product.  Any surcharge will be|Y
01|238522|3|4|disclosed prior to acceptance of an order.|Y
01|238524|1|1|Additional demo unit discount applied to entire quote.|Y
01|238524|1|2|Standard one (1) year warranty honored from date of|Y
01|238524|1|3|delivery.|Y
01|238534|1|1|**SPECIAL - cannot be cancelled or returned upon|Y
01|238534|1|2|receipt of a PO**|Y
01|238536|1|1|H01MA12 Draw screw for H01MA12 R-1466|Y
01|238541|1|1|No Inspection Required|Y
01|238544|1|1|Additional 20% Overstock Promo discount applied.|Y
01|238544|1|2|**non-cancellable non-returnable**|Y
01|238551|1|1|1st batch/RPLC GL1956/16:APRVD by Tim|Y
01|238551|3|1|1st batch/RPLC GL1956/16:APRVD by Tim|Y
01|238554|1|1|RGA#LVR-62290/|Y
01|238554|1|2|Repair of OKL3-ER32Z S/N:AL0888 AL0889|Y
01|238554|2|1|Bearings seals o-rings collet nut|Y
01|238560|1|1|This is for yearly calibration and pricing can change.|Y
01|238577|4|1|Additional 20% discount applied for our Overstock|Y
01|238577|4|2|Promotion.  We currently have four (4) of these|Y
01|238577|4|3|remaining.  Once a Purchase Order has been received|Y
01|238577|4|4|these holders cannot be cancelled or returned.|Y
01|238577|13|1|Additional 20% discount applied for our Overstock|Y
01|238577|13|2|Promotion.  We currently have four (4) of these holders|Y
01|238577|13|3|in stock.  Once a Purchase Order has been received|Y
01|238577|13|4|these holders cannot be cancelled or returned.|Y
01|238577|19|1|Additional 20% discount applied for our Overstock|Y
01|238577|19|2|Promotion.  We currently have four (4) of these|Y
01|238577|19|3|holders in stock.  Once a Purchase Order has been|Y
01|238577|19|4|received these holders cannot be cancelled or|Y
01|238577|19|5|returned.|Y
01|238577|21|1|Additional 20% discount applied for our Overstock|Y
01|238577|21|2|Promotion.  Once a Purchase Order has been received|Y
01|238577|21|3|this holder cannot be cancelled or returned.|Y
01|238580|1|1|*To be installed w/ PS-132 @ Factory|Y
01|238580|2|1|*To be installed w/ BT30-TB40-300 @ Factory|Y
01|238588|1|1|DIN modified holder is non-returnable.|Y
01|238588|1|2|Quoted at NET pricing|Y
01|238592|1|1|HSK63F-START.2-380 PACKAGE|Y
01|238592|1|2|INCLUDES 10 TOOLS LISTED BELOW|Y
01|238592|2|1|HSK63F-START.2-200 PACKAGE|Y
01|238592|2|2|INCLUDES 10 TOOLS LISTED BELOW|Y
01|238592|5|1|ONLY ELIGIBLE WITH NEW SHRINK MACHINE PURCHASE|Y
01|238592|11|1|TOOLING INELIGIBLE TO BE COMBINED WITH SHRINK FIT|Y
01|238592|11|2|PROMOTION. MIX AND MATCH IN STOCK TOOLING ONLY|Y
01|238592|11|3|x|Y
01|238592|14|1|H63F-SF8-80|Y
01|238592|14|2|HSK63F Shrink Fit Holder 8mm 25K|Y
01|238594|2|1|Please note additional 20% applied per overstock promo.|Y
01|238594|2|2|Once PO/order issued these cannot be cancelled or|Y
01|238594|2|3|returned. These will need to be requoted for price &|Y
01|238594|2|4|availability upon stock depletion.|Y
01|238602|4|1|BMT75-ER40Z  BMT75 Live ER40 Z<Axial>90D External|Y
01|238602|4|2|coolant 6K and Center Height 60mm|Y
01|238603|1|1|Final Part# TBD **Quoted at NET Price**|Y
01|238603|1|2|Mimatic Live Tool for Mazak HQR 200 VDI40 ER8|Y
01|238603|1|3|Tech Specs: shaft VDI40 / collet holder ER8 / external|Y
01|238603|1|4|coolant or air supply thru pipe / direction of rotation|Y
01|238603|1|5|reversal / L=115.5mm / L1=63.6mm / Gear Ratio i=1:2|Y
01|238603|1|6|/ Max Torque Rate 3Nm / Max Spindle Revol. n1(max)=|Y
01|238603|1|7|4000 rpm n2(max) = 8000 rpm / weight around 9.5 kg|Y
01|238606|1|1|Final Part#TBD **Quoted at NET price**|Y
01|238606|1|2|Tech Specs: shaft VDI40 / collet holder ER8 / external|Y
01|238606|1|3|coolant or air supply thru pipe / direction of rotation|Y
01|238606|1|4|reversal / Industry 4.0 - Eltimon Included Recording|Y
01|238606|1|5|of Operating hours number of revolutions temp. / For|Y
01|238606|1|6|preventative maint. free APP on Google Play Store/ L=|Y
01|238606|1|7|115.5mm / L1=63.6mm / Gear Ratio i=1:2 / max torque|Y
01|238606|1|8|rate M(max)=3Nm / Max Spindle Rev. n1(max)=4000 RPM|Y
01|238606|1|9|n2(max)=8000 RPM / weight around 9.5kg|Y
01|238606|13|1|Final Part# TBD **Quoted at NET price**|Y
01|238606|13|2|Eltimon Smart Gateway bestehend aus Software|Y
01|238606|13|3|elektronik Bauteilen und Gehause|Y
01|238611|1|1|need with IC - 2-6 pcs per John Ducy|Y
01|238636|3|1|Taper Flange TF45-GKYE-AX201|Y
01|238636|4|1|Hydraulic Unit HYD-PD-AX201|Y
01|238651|1|1|For Seiki UT380.  Mits M80A CNC controller|Y
01|238651|3|1|Includes riser block for rotary table|Y
01|238651|3|2|Foundation Plate extra|Y
01|238651|4|1|Foundation Plate for overhanging table.  1-1/4 ...|Y
01|238651|4|2|Alloy tooling plate.|Y
01|238651|4|3|Approval drawings will be provided after PO.|Y
01|238657|1|1|S20T-SK10-45 Short Taper Tool SK10 with 45mm gage lgth.|Y
01|238657|2|1|S20T-SK16-65 Short Taper Tool SK16 with 65mm gage lgth.|Y
01|238657|3|1|PRE-SPDL-20 Presetter Spindle #20T for Larth|Y
01|238663|1|1|Mimatic Part#: 196995|Y
01|238663|2|1|Mimatic Part#: 124034|Y
01|238689|7|1|A tariff surcharge may be added to this quotation in|Y
01|238689|7|2|the event of a sustained tariff increase on the|Y
01|238689|7|3|importation of this product.  Any surcharge will be|Y
01|238689|7|4|disclosed prior to acceptance of an order.|Y
01|238700|1|1|Discontinued Item - cannot be cancelled or returned|Y
01|238700|1|2|upon receipt of a PO|Y
01|238730|1|1|CAT40 to C5 Capto Toolholder|Y
01|238730|1|2|Same as Sandvik C5-A390B.45-40 040|Y
01|238733|1|1|Currently three (3) in stock.  Balance of five (5)|Y
01|238733|1|2|estimated lead time is 11~13 weeks after receipt of an|Y
01|238733|1|3|order.|Y
01|238743|1|1|Currently no stock.  Estimated lead time is end of|Y
01|238743|1|2|December 2025.|Y
01|238748|1|1|Special two piece price.|Y
01|238749|2|1|Currently no stock.  Estimated lead time is early to|Y
01|238749|2|2|mid October.|Y
01|238751|5|1|Estimated shipping cost to|Y
01|238751|5|2|Santa Teresa NM 88008 USA|Y
01|238751|5|3|Final cost will be confirmed when PO is received|Y
01|238751|5|4|and confirmed by our CS department|Y
01|238781|1|1|HSK80B-HC4-90|Y
01|238781|2|1|HSK80B-HC4-140|Y
01|238788|1|1|RGA#LVR-62261/|Y
01|238788|1|2|Repair of MZQT47-ER32X-OFF S/N:20767 02 (Mim#124034)|Y
01|238788|2|1|Bearings seals and o-rings to be replaced|Y
01|238793|1|1|1.181 riserA36 HRS fully annealed|Y
01|238793|1|2|blanchard and finish ground - 4 weeks ARO|Y
01|238793|2|1|disassembly/assembly and testing of the components|Y
01|238793|2|2|We also need the TAT and NCT shipped to LN for|Y
01|238793|2|3|We will ship complete system to Ferrous|Y
01|238799|1|1|*Part Number TBD|Y
01|238799|1|2|Collet similar to KD711-1001-B American Showa 22mm|Y
01|238799|1|3|Beta Design|Y
01|238799|1|4|**Delivery marked as TBD we estimate 2.5 Months but|Y
01|238799|1|5|this number is still subject to change. We will update|Y
01|238799|1|6|you once we have a concrete lead time from our factory.|Y
01|238808|1|1|Quoted as 1 to 5 tools.|Y
01|238809|5|1|Estimated lead time is end of November/early December.|Y
01|238818|1|1|RGA#TAR-62243|Y
01|238818|1|2|CNCZ302FA|Y
01|238818|1|3|SN: 7007|Y
01|238819|6|1|CUSTOM POSITIONING BLOCK FOR CAT50 MACHINE|Y
01|238823|2|1|Please note additional 20% applied per overstock promo.|Y
01|238823|2|2|Once PO/order issued these cannot be cancelled or|Y
01|238823|2|3|returned. These will need to be requoted for price &|Y
01|238823|2|4|availability upon stock depletion.|Y
01|238823|7|1|Please note additional 20% applied per overstock promo.|Y
01|238823|7|2|Once PO/order issued these cannot be cancelled or|Y
01|238823|7|3|returned. These will need to be requoted for price &|Y
01|238823|7|4|availability upon stock depletion.|Y
01|238830|14|1|Replaces TQW-SK10(1)|Y
01|238830|15|1|Replaces TQW-SK16(43)|Y
01|238838|1|1|RGA#TOR-62279/|Y
01|238838|1|2|Repair of SF-FI5-UNIT-200 S/N:5JB6057|Y
01|238854|2|1|Please note additional 20% applied per overstock promo.|Y
01|238854|2|2|Once PO/order issued these cannot be cancelled or|Y
01|238854|2|3|returned. These will need to be requoted for price &|Y
01|238854|2|4|availability upon stock depletion.|Y
01|238858|1|1|FOR BRIDGEPORT V480APC W/ FANUC Oi-MF|Y
01|238858|1|2|4TH/5TH PREP EXISTS|Y
01|238858|3|1|DUAL TABLE INSTALLATION|Y
01|238858|4|1|STEEL FOUNDATION PLATE.|Y
01|238864|1|1|RGA#TOR-62223/|Y
01|238864|1|2|Repair of PF-2|Y
01|238864|2|1|need to replace battery|Y
01|238864|3|1|replace battery and recalibrate|Y
01|238881|6|1|INCLUDES LOCATING REQUIRED ACCESSORY SIGNALS FROM|Y
01|238881|6|2|CNC MACHINE. (CYCLE START/STOP CLAMP/UNCLAMP DOOR|Y
01|238881|6|3|OPEN/CLOSE ETC)|Y
01|238881|6|4|INCLUDES UNBOXING EZ-AUTOCART AND LN1813 MOUNTING|Y
01|238881|6|5|LN1813 TO CART INSTALLING GRIPPER. TESTING ALL|Y
01|238881|6|6|ACCESSORIES AND ROBOT FOR FUNCTION.|Y
01|238881|6|7|DOES NOT INCLUDE INSTALLATION OF AUTODOOR.|Y
01|238887|1|1|**cannot be cancelled or returned upon receipt of PO**|Y
01|238887|4|1|**cannot be cancelled or returned upon receipt of PO**|Y
01|238888|1|1|**cannot be cancelled or returned upon receipt of PO**|Y
01|238888|4|1|**cannot be cancelled or returned upon receipt of PO**|Y
01|238915|1|1|included external cable set|Y
01|238920|1|1|**NET PRICE**|Y
01|238920|1|2|QTY BREAK NET PRICING:|Y
01|238920|1|3|1 pc: $27478.00|Y
01|238920|1|4|2 pcs: $17737.00/ea|Y
01|238920|2|1|LN to make block after receipt of spindle specs|Y
01|238920|2|2|necessary for design.|Y
01|238921|1|1|Estimated lead time is 16~18 weeks after receipt of an|Y
01|238921|1|2|order.|Y
01|238927|2|1|**Discontinued item - cannot be cancelled or returned|Y
01|238927|2|2|upon receipt of a PO**|Y
01|238935|1|1|SP Balanced CAT40 Holder GL:90mm 20000RPM 5/8-11UNC|Y
01|238935|1|2|Special Order Item. Unit Price Each. No cancellation|Y
01|238935|1|3|after receipt the PO.|Y
01|238935|1|4|Minimum Order Qty.: 2|Y
01|238935|1|5|Lead Time: 10-12weeks (Design2-3wksMfg6-7wksShip2wks)|Y
01|238940|6|1|HSK100A-NPU8-130|Y
01|238942|1|1|Mimatic Part#: 131591|Y
01|238945|6|1|*Wrench for NC5-46-C16-120|Y
01|238964|1|1|We will issue a tooling certificate once the purchase|Y
01|238964|1|2|order is received. Thank you!!|Y
01|238967|1|1|Quoted at NET pricing|Y
01|238967|2|1|A tariff surcharge of 8% will be added to every order|Y
01|238967|2|2|placed after September 1st 2025(until further notice).|Y
01|238967|2|3|This surcharge will be acknowledged upon acceptance|Y
01|238967|2|4|of every order.|Y
01|238971|1|1|Please note these are considered special and are|Y
01|238971|1|2|non-standard stock. Once PO/order issued these cannot|Y
01|238971|1|3|be cancelled or returned.|Y
01|238974|1|1|SN#3622 CNC260FA RGA#TAR-62285|Y
01|238974|1|2|Owens Corning|Y
01|238976|2|1|LN to make block ~1 Week after receipt of spindle|Y
01|238976|2|2|specs necessary for design|Y
01|238982|1|1|RGA#TAR-61690|Y
01|238982|1|2|5AX-800FA-RCN2-RJ6 SN: 2002|Y
01|238983|2|1|https://zeroclamp.com/en/?s=24697|Y
01|238992|2|1|Additional 20% discount added for our Overstock|Y
01|238992|2|2|Promotion.  Once a Purchase Order has been received|Y
01|238992|2|3|this item cannot be cancelled or returned.|Y
01|239001|6|1|For 3mm|Y
01|239003|1|1|RGA#TAR-62284|Y
01|239003|1|2|CNC302MA|Y
01|239003|1|3|SN: 15894C|Y
01|239042|1|1|P/N: NBT30-SF0312-105MT|Y
01|239042|1|2|NBT30 DualContact Shrink-Fit 8mm Mold Type 105mm G/l|Y
01|239042|1|3|Qty Breaks: (*NET Price)|Y
01|239042|1|4|2-4 pcs: $867|Y
01|239042|1|5|5-9 pcs: $553|Y
01|239042|1|6|10+ pcs: $369|Y
01|239042|1|7|Delivery:|Y
01|239042|1|8|2 pcs 10/20 3+ pcs: 10-12 Weeks|Y
01|239044|2|1|PS-872|Y
01|239044|2|2|Retention Knob/Pull Stud BT40-MTB3|Y
01|239055|6|1|Estimated lead time is 10~12 weeks after receipt of an|Y
01|239055|6|2|order.|Y
01|239055|7|1|Estimated lead time is 10~12 weeks after receipt of an|Y
01|239055|7|2|order.|Y
01|239072|4|1|Currently one (1) in stock in Illinois.  Balance of|Y
01|239072|4|2|one (1) TBD.|Y
01|239082|1|1|Net price includes the following parts for assembly|Y
01|239082|1|2|at Lyndex-Nikken: HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|239082|1|3|and customers RFID chip. Holders will be re-balanced.|Y
01|239082|2|1|Net price includes the following parts for assembly|Y
01|239082|2|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|239082|2|3|customer's supplied RFID chip and holder re-balanced.|Y
01|239082|3|1|Net price includes the following parts for assembly|Y
01|239082|3|2|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|239082|3|3|and customers RFID chips. Holders to be re-balanced.|Y
01|239082|36|1|Net price include the following parts for assembly|Y
01|239082|36|2|at Lyndex-Nikken: HSK63-Tube and customer's supplied|Y
01|239082|36|3|RFID chip and holder re-balanced.|Y
01|239085|7|1|Includes drive unit short bar fiber optic cable|Y
01|239085|7|2|communications cables external cables.|Y
01|239091|1|1|MSC SKU: 28888113|Y
01|239091|1|2|Price effective as of 9/01/2025|Y
01|239095|1|1|- 2 piezas en stock (USA)|Y
01|239095|1|2|- 2 piezas en fabricacin (tiempo estimado: 5 semanas)|Y
01|239096|1|1|HSK40C-SK6-60|Y
01|239096|2|1|HSK40C Blank Bar OD25mm GL100mm|Y
01|239096|3|1|HSK40C Blank Bar OD25mm GL100mm|Y
01|239096|4|1|HSK40C Blank Bar OD25mm GL100mm|Y
01|239096|5|1|HSK40C Blank Bar OD32mm GL120mm|Y
01|239096|6|1|HSK40C Blank Bar OD32mm GL120mm|Y
01|239096|7|1|HSK40C Blank Bar OD32mm GL120mm|Y
01|239103|11|1|A tariff surcharge may be added to this quotation in|Y
01|239103|11|2|the event of a sustained tariff increase on the|Y
01|239103|11|3|importation of this product.  Any surcharge will be|Y
01|239103|11|4|disclosed prior to acceptance of an order.|Y
01|239112|1|1|INSPECTION OF ROTARY TABLES ON YEARLY BASIS|Y
01|239112|1|2|ESTIMATE OF QUOTE IS FOR 4 HOURS OF LABOR TO CHECK|Y
01|239119|1|1|Req.INS/Install E20-NUT|Y
01|239119|2|1|1st Batch/1014596 DGI/Schaeffler 7/15:DWG APRVED|Y
01|239119|4|1|1st Batch/(1)1017266 MSC/Barnes Aero|Y
01|239129|1|1|MSC SKU: 77770212|Y
01|239129|1|2|Please note this is considered special and has been|Y
01|239129|1|3|quoted as a Special. Once PO/order is issued these|Y
01|239129|1|4|cannot be cancelled or returned.|Y
01|239132|1|1|No Ins req'd.|Y
01|239132|2|1|No Ins req'd.|Y
01|239137|1|1|T/P Inspection Required|Y
01|239151|1|1|IT50-MTB5-105|Y
01|239168|1|1|Please allow 4 weeks for approval drawing 12 weeks to|Y
01|239168|1|2|manufacture and 2 weeks for delivery. These are|Y
01|239168|1|3|non-standard stock & considered special. Once PO/order|Y
01|239168|1|4|is issued these cannot be cancelled or returned.|Y
01|239168|1|5|Manufacturing completion date is based upon receipt of|Y
01|239168|1|6|your purchase order after final clarification/approval|Y
01|239168|1|7|have been received.|Y
01|239185|1|1|RGA#CUR-62283/|Y
01|239185|1|2|Repair of C40RA-0025M S/N:18902340 03 (Mim#175241)|Y
01|239185|2|1|Bearings seals and o-rings to be replaced|Y
01|239186|6|1|INCLUDES LOCATING REQUIRED ACCESSORY SIGNALS FROM|Y
01|239186|6|2|CNC MACHINE. (CYCLE START/STOP CLAMP/UNCLAMP DOOR|Y
01|239186|6|3|OPEN/CLOSE ETC)|Y
01|239186|6|4|INCLUDES UNBOXING EZ-AUTOCART AND LN1813 MOUNTING|Y
01|239186|6|5|LN1813 TO CART INSTALLING GRIPPER. TESTING ALL|Y
01|239186|6|6|ACCESSORIES AND ROBOT FOR FUNCTION.|Y
01|239186|6|7|INCLUDES UNBOXING AND INSTALLING AUTODOOR ON|Y
01|239186|6|8|CNC MACHINE.  AND WIRING THE AUTODOOR INTO THE|Y
01|239186|6|9|CNC MACHINE OR MACHINE TENDING SOLUTION AS|Y
01|239186|6|10|REQUIRED.|Y
01|239186|7|1|INCLUDES LOCATING REQUIRED ACCESSORY SIGNALS FROM|Y
01|239186|7|2|CNC MACHINE. (CYCLE START/STOP CLAMP/UNCLAMP DOOR|Y
01|239186|7|3|OPEN/CLOSE ETC)|Y
01|239186|7|4|INCLUDES UNBOXING EZ-AUTOCART AND LN1813 MOUNTING|Y
01|239186|7|5|LN1813 TO CART INSTALLING GRIPPER. TESTING ALL|Y
01|239186|7|6|ACCESSORIES AND ROBOT FOR FUNCTION.|Y
01|239186|7|7|DOES NOT INCLUDE INSTALLATION OF AUTODOOR.|Y
01|239189|1|1|CAT40-Fixed Angle Head|Y
01|239189|1|2|16 Degree Section A-A Represents Hole A|Y
01|239189|1|3|Part number TBD.|Y
01|239189|27|1|CAT40 Fixed Angle Head|Y
01|239189|27|2|16 Degree Section C-C Represents Hole C|Y
01|239189|27|3|Part Number TBD|Y
01|239189|54|1|CAT40-Fixed Angle Head|Y
01|239189|54|2|10 Degree Section B-B Represents Hole B|Y
01|239189|54|3|Part Number TBD|Y
01|239189|78|1|Quoted at NET price.|Y
01|239191|4|1|Delivery to be determined upon receipt of order.|Y
01|239191|4|2|This is quote at NET price.|Y
01|239195|1|1|RGA#LVR-62264/|Y
01|239195|1|2|Repair of OKE4-ER40Z-ICE S/N:24900202 02 (Mim#190233)|Y
01|239195|2|1|Bearings seals and o-rings to be replaced|Y
01|239203|4|1|Spindle wrench for MNL12-SK20X-ICE-10K-J and|Y
01|239203|4|2|MNZ20-SK20X-ICE-12K|Y
01|239203|5|1|Nut wrench for MNL12-SK20X-ICE-10K-J and|Y
01|239203|5|2|MNZ20-SK20X-ICE-12K|Y
01|239206|1|1|CAT40-SK10-180UP-IDU CAT40 Slim Chuck SK10 ChipHole 30K|Y
01|239206|1|2|Note: We will create part number when PO is received.|Y
01|239207|1|1|1st batch/RPLC GL1956/16:APRVD by Tim|Y
01|239207|2|1|1st batch/RPLC GL1956/16:APRVD by Tim|Y
01|239208|2|1|Special Toe Clamps location keys and hardware|Y
01|239212|1|1|RGA#CUR-62309/|Y
01|239212|1|2|Repair of C50-MRAM S/N:22905804 02 (Mim#162732)|Y
01|239212|2|1|bearings seals and o-rings to be replaced|Y
01|239217|1|1|RGA#LVR-62310/|Y
01|239217|1|2|Repair of MZQT5-CT40Z S/N:21906237 02 (Mim#131591)|Y
01|239217|2|1|Bearings seals and o-rings to be replaced|Y
01|239223|1|1|RGA#LVR-62270/|Y
01|239223|1|2|Repair of 05.0611.7341.505 S/N:5680 06|Y
01|239223|2|1|ER32 spindle bearings seals and o-rings to be replace|Y
01|239233|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|239233|2|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|239233|3|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|239233|4|1|Req.INS/Install E20-NUT|Y
01|239233|5|1|Req.INS/Install E32-NUT|Y
01|239233|6|1|Req.INS/Supplied 1-KEYSET A1/2-20 Check if installed.|Y
01|239233|7|1|Req.INS/Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|239233|8|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|239233|9|1|Req.INS/Install E40-NUT & ER40-SCREW(C)|Y
01|239233|11|1|Req.INS/Check if these are CAT40 or NCAT40|Y
01|239233|11|2|INV:CAT40 Packing List:NCAT40|Y
01|239234|1|1|Part Number: BMT55-ER32Z-MS-85|Y
01|239234|1|2|BMT55 Live ER32 Z<Axial>90D MainSub1+1 ExtCool 6.5K|Y
01|239234|1|3|Center Height 85mm|Y
01|239241|1|1|Mimatic Live Tool per print A204015|Y
01|239245|2|1|***REQUIRED*** Customer must provide the following:|Y
01|239245|2|2|FANUC Servo Data Sheets for machine|Y
01|239245|2|3|Pictures of the machine control and electrical cabinet|Y
01|239245|2|4|***Customer is responsible for 4th axis option from DMG|Y
01|239271|2|1|Please note there is currently 1 on the shelf...we're|Y
01|239271|2|2|looking at 1 week delivery on remaining 2 pieces.|Y
01|239277|1|1|RGA#TOR-62313/|Y
01|239277|1|2|Repair of SF-START2-UNIT-200 s/n:2J7180|Y
01|239289|1|1|AC003005 RFID BIS-C-122-04/L installed and holder|Y
01|239289|1|2|re-balanced.|Y
01|239289|1|3|Quoted at NET each.|Y
01|239295|4|1|Custom made adapter to mount manual 5C closer to CNC260|Y
01|239295|6|1|A tariff surcharge may be added to this quotation in|Y
01|239295|6|2|the event of a sustained tariff increase on the|Y
01|239295|6|3|importation of this product.  Any surcharge will be|Y
01|239295|6|4|disclosed prior to acceptance of an order.|Y
01|239301|1|1|Special NC50F1-2500-3.16CP Face Mill 2.5 X 3.16 gage|Y
01|239301|1|2|length x 3.87 diameter above the flange.|Y
01|239301|1|3|Caution: This holder CANNOT be tool changed.|Y
01|239301|1|4|Quoted at NET price each.|Y
01|239310|1|1|ECC-28-10|Y
01|239310|2|1|ECC-36-11.5|Y
01|239313|5|1|Please note this is considered non-standard stock &|Y
01|239313|5|2|special. Once PO/order issued these cannot be|Y
01|239313|5|3|cancelled or returned.|Y
01|239318|1|1|Custom Jaws:Machined to customer provided print/model|Y
01|239318|1|2|Made from A2 tool steel. Quoted as a set.|Y
01|239333|19|1|Estimated lead time is 3~5 days after design approval.|Y
01|239336|3|1|Once a Purchase Order has been received this item|Y
01|239336|3|2|cannot be cancelled or returned.|Y
01|239343|3|1|*Only 3 pcs left in stock cannot order over that and|Y
01|239343|3|2|items will be non-returnable and non-cancellable.|Y
01|239343|6|1|*Wrench for CAT40-SK13-120UP-IDU|Y
01|239344|2|1|Includes - Power and Feedback Cables from Nikken table|Y
01|239344|2|2|to machine bulkhead internal cables servo drive|Y
01|239344|2|3|Travel and Labor|Y
01|239347|9|1|IT40-SMS22-120|Y
01|239360|1|1|Estimated lead time is mid/end of November.|Y
01|239382|1|1|2% added for web order -danas|Y
01|239383|1|1|6 mos MFG + Shipping (Boat) 2 mos|Y
01|239403|1|1|**non-cancellable non-returnable**|Y
01|239403|1|2|Additional 20% Overstock Promo discount applied.|Y
01|239410|1|1|Additional 20% Overstock Promo discount applied -|Y
01|239410|1|2|cannot be cancelled or returned upon receipt of PO|Y
01|239411|2|1|*ICE and Standard versions in-stock no MainSub version|N
01|239411|2|2|however.|N
01|239413|7|1|*Wrench for CAT50-C1-135UG-IDU|Y
01|239426|1|1|SN#4980 5AX-130FA-M RGA#TAR-62316 Rayco Steel|Y
01|239431|1|1|RGA#TOR-62307|Y
01|239431|1|2|Repair of 2x CAT40-C1 1/4SL-85U and|Y
01|239431|1|3|1x CAT40-C1 1/4SL-105U-IDU|Y
01|239436|4|1|Customer has kit-delivered by Matt/Oen|Y
01|239436|4|2|**Invoice only**|Y
01|239446|1|1|Currently stock at the factory.  Estimated lead time is|Y
01|239446|1|2|early November if an order is placed by October 14th.|Y
01|239446|2|1|Currently one (1) in stock at the factory.  Estimated|Y
01|239446|2|2|lead time is early November if an order is placed by|Y
01|239446|2|3|October 14th.|Y
01|239454|2|1|Lyndex-Nikken to make positioning block upon receipt of|Y
01|239454|2|2|spindle drawing.|Y
01|239455|1|1|**Test Tool- Purchase - Billing Purposes Only**|Y
01|239455|2|1|**Test Tool- Purchase - Billing Purposes Only**|Y
01|239459|6|1|Recommended torque wrench|Y
01|239459|7|1|torque wrench adapter|Y
01|239461|1|1|This item is considered custom - cannot be cancelled|Y
01|239461|1|2|or returned upon receipt of order|Y
01|239479|1|1|Quill compression part block part attached and|Y
01|239479|1|2|tapered bushing|Y
01|239494|1|1|RGA#TOR-62347|Y
01|239494|1|2|Repair of 2x CAT50-C1F-135UG 2x MCAT50-C1F-135UG|Y
01|239494|1|3|1x CAT50-C3/4F-165UG 1x MCAT50-C3/4F135UG|Y
01|239504|1|1|Currently ten (10) in stock balance of two (2)|Y
01|239504|1|2|estimated lead time is 10~12 weeks after receipt of an|Y
01|239504|1|3|order.|Y
01|239504|2|1|We currently do not have stock.  Estimated lead time is|Y
01|239504|2|2|10~12 weeks after receipt of an order.|Y
01|239511|3|1|Customer responsible for machine options and ladder for|Y
01|239511|3|2|accepting a rotary axis.|Y
01|239512|1|1|Please allow 12 weeks for manufacturing and delivery|Y
01|239512|1|2|time. T32336 is considered special and has been quoted|Y
01|239512|1|3|at special net price. These cannot be cancelled or|Y
01|239512|1|4|returned upon PO/order.|Y
01|239513|1|1|Please allow 1-2 weeks delivery after PO is received &|Y
01|239513|1|2|design is confirmed.|Y
01|239518|1|1|T/P Inspection Required|Y
01|239518|2|1|T/P Inspection Required|Y
01|239518|3|1|T/P Inspection Required|Y
01|239521|1|1|Special non-standard stock - cannot be cancelled or|Y
01|239521|1|2|returned upon receipt of PO|Y
01|239540|1|1|Estimated lead time is 15~16 weeks after receipt of an|Y
01|239540|1|2|order.|Y
01|239557|2|1|We currently have six (6) in stock.  We have two (2)|Y
01|239557|2|2|estimated to arrive early/mid November and the balance|Y
01|239557|2|3|is estimated to arrive mid December.|Y
01|239562|1|1|**non-cancellable non-returnable**|Y
01|239563|1|1|**non-cancellable non-returnable**|Y
01|239570|1|1|SN#1081 5AX-DD200BF2 RGA#TAR-62327|Y
01|239570|1|2|Flex-Cell|Y
01|239577|4|1|Spindle wrench for MNL12-SK20X-ICE-10K-J and|Y
01|239577|4|2|MNZ20-SK20X-ICE-12K|Y
01|239577|5|1|Nut wrench for MNL12-SK20X-ICE-10K-J and|Y
01|239577|5|2|MNZ20-SK20X-ICE-12K|Y
01|239581|1|1|We currently have one (1) in stock with another five|N
01|239581|1|2|(5) due in by the end of October.  There are others|N
01|239581|1|3|coming in however it'll be mid-December.|N
01|239584|1|1|Component for NIKKEN NXE-COOL|Y
01|239584|1|2|JPY34960/ea(EX:$1=JPY152)|Y
01|239588|1|1|FOR DN DNM5700II FANUC OI-MF+|Y
01|239588|3|1|wh2 used chuck and adapter plate|Y
01|239588|3|2|Special Price with package|Y
01|239588|3|3|$1000 net.|Y
01|239595|3|1|P/N: CAT50-C3/4F-165UG-IDU-M|Y
01|239595|6|1|MCAT50 taper product is part of our overstock list.|Y
01|239595|6|2|Additional discount has been applied.|Y
01|239603|3|1|***Customer responsible for machine options if needed.|Y
01|239620|1|1|SYIC Cross to MMC|Y
01|239620|1|2|Capto slimfit chucks .550 nose diameter C4 w/75mm|Y
01|239629|1|1|RGA#TAR-62344|Y
01|239629|1|2|CNC202-2W-250BFA-M|Y
01|239629|1|3|SN: 43137TC|Y
01|239632|1|1|RGA#LVR-62358/|Y
01|239632|1|2|Repair of MNL12-ER32-ICE-10K S/N:98901 03 (Mim#100876)|Y
01|239632|2|1|Bearings seals and o-rings to be replaced|Y
01|239639|1|1|RGA#CUR-62350/|Y
01|239639|1|2|Repair of C50-MRAM S/N:19907938 05 (Mim#162732)|Y
01|239644|2|1|NCAT50-C3/4-135UG-IDU-M|Y
01|239644|3|1|NCAT50-C1-135UG-IDU-M|Y
01|239644|4|1|CAT50-C1-135UG-IDU-M|Y
01|239644|5|1|CAT50-C3/4-165UG-IDU-M|Y
01|239644|6|1|NCAT50-C1-135UG-IDU-M|Y
01|239648|1|1|Custom 5C 5/8 ID bore collet that allows a .635 pin|Y
01|239648|1|2|to fit through in the relaxed condition...see email|Y
01|239648|1|3|thread from adept@dutton-lainson.com & Tim to territory|Y
01|239648|1|4|37...|Y
01|239649|1|1|NC4007-0016-2.25 NCAT40 DualContact ER16 Collet Chuck|Y
01|239649|1|2|HiTorque BearingNut Chip Hole 25K|Y
01|239651|1|1|**Quoted at NET price** Min Order QTY 10pcs|Y
01|239651|1|2|Please note this is special non-standard stock. Item|Y
01|239651|1|3|cannot be cancelled or returned upon receipt of PO.|Y
01|239651|1|4|.|Y
01|239651|1|5|Delivery: Please allow 1-2 weeks for design + 23-25|Y
01|239651|1|6|weeks for manufacturing/shipping after receipt of|Y
01|239651|1|7|signed approval drawing.|Y
01|239673|3|1|Additional 20% discount added to standard discount.|Y
01|239673|3|2|Final sale|Y
01|239683|4|1|Please note additional 20% applied per overstock promo.|Y
01|239683|4|2|These will need to be requoted for price & availability|Y
01|239683|4|3|upon stock depletion. Once PO/order issued these can't|Y
01|239683|4|4|be cancelled or returned.|Y
01|239689|5|1|Please note this is considered special. These cannot be|Y
01|239689|5|2|cancelled or returned after PO/order is issued.|Y
01|239707|1|1|Includes OSP Cable Set.|Y
01|239708|1|1|Cables included|Y
01|239719|1|1|For Mill Tooling - MV560|Y
01|239722|2|1|Swing Box MA-600HBII OKUMA machine|Y
01|239722|3|1|Direct Mount Cable Set|Y
01|239730|1|1|Currently have stock at the factory.  Estimated|Y
01|239730|1|2|delivery is 2~3 weeks after receipt of an order.|Y
01|239735|1|1|Currently nine (9) in stock.  There are an additional|Y
01|239735|1|2|eleven (11) coming with an estimated delivery|Y
01|239735|1|3|end of December.  The balance ETA is 20~22 weeks.|Y
01|239735|1|4|This would based on the receipt of an order.|Y
01|239740|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|239747|2|1|P/N: NCAT50-C1F-135UG-DIN-M|Y
01|239747|3|1|P/N: CAT50-C3/4F-165UG-IDU-M|Y
01|239747|4|1|P/N: NCAT50-C3/4F-135UG-IDU-M|Y
01|239754|2|1|Special non-standard item - cannot be cancelled or|Y
01|239754|2|2|returned upon receipt of order|Y
01|239755|2|1|Installation will utlize existing 4th axis cables|Y
01|239762|1|1|Special Discount added|Y
01|239764|1|1|NC4007-0020-2.50 NCAT40 DualContact ER20 Collet Chuck|Y
01|239764|1|2|With E20-NUT|Y
01|239766|1|1|Final Part# TBD **NET PRICE**|Y
01|239766|1|2|BMT55 Static BG2 Z<Axial>90D IntExtCool CH70|Y
01|239766|1|3|SPECIAL - non-cancellable non-returnable item|Y
01|239776|2|1|Additional 20% discount has been applied for our|Y
01|239776|2|2|Overstock Promotion.  Once a Purchase Order has been|Y
01|239776|2|3|received this item cannot be cancelled or returned.|Y
01|239776|4|1|Additional 20% discount has been applied for our|Y
01|239776|4|2|Overstock Promotion.  Once a Purchase Order has been|Y
01|239776|4|3|received this item cannot be cancelled or returned.|Y
01|239786|1|1|To install CNC260FA-M Serial #6340 on new Wele SB316YM|Y
01|239787|1|1|HSK63A-HC16-3.94|Y
01|239801|1|1|Delivery: 28-pc 1~2 Weeks and balance 13~14 Weeks ARO|Y
01|239810|2|1|Net Price|Y
01|239810|2|2|SY20-120|Y
01|239810|2|3|Centering Holder OD:20mm|Y
01|239824|1|1|For Live/Static Tooling only|Y
01|239829|1|1|BT30-SF0125-3.75  BT30 Shrink Fit Holder 1/8 25K|Y
01|239829|1|2|with 3.75 gage length.|Y
01|239829|7|1|Quoted at NET price each for minimum 20-pcs|Y
01|239829|8|1|Quoted at NET price each for minimum 50-pcs|Y
01|239829|9|1|Quoted at NET price each for minimum 100-pcs|Y
01|239829|12|1|Quoted at NET price.|Y
01|239829|13|1|Quoted at NET price.|Y
01|239829|14|1|Quoted at NET price.|Y
01|239830|1|1|TNKQ2510-0575 0002|Y
01|239830|3|1|TNKQ2510-0575 0003|Y
01|239830|5|1|TNKQ2510-0575 0004|Y
01|239830|7|1|TNKQ2510-0575 0005|Y
01|239830|9|1|TNKQ2510-0575 0006|Y
01|239830|11|1|TNKQ2510-0575 0007|Y
01|239830|17|1|TNKQ2510-0575 0009 - please note these are considered|Y
01|239830|17|2|special and cannot be cancelled or return upon PO/order|Y
01|239830|17|3|issued.|Y
01|239830|19|1|TNKQ2510-0575 0010 - please note these are considered|Y
01|239830|19|2|special and cannot be cancelled or return upon PO/order|Y
01|239830|19|3|issued.|Y
01|239830|21|1|TNKQ2510-0575 0011|Y
01|239830|23|1|TNKQ2510-0575 0012|Y
01|239830|25|1|TNKQ2510-0575 0013|Y
01|239830|30|1|TNKQ2510-0575 0014|Y
01|239830|32|1|TNKQ2510-0575 0015|Y
01|239830|34|1|TNKQ2510-0575 0016|Y
01|239830|36|1|TNKQ2510-0575 0017|Y
01|239830|38|1|TNKQ2510-0575 0018|Y
01|239830|40|1|TNKQ2510-0575 0019|Y
01|239830|42|1|TNKQ2510-0575 0020|Y
01|239830|44|1|TNKQ2510-0575 0021|Y
01|239830|46|1|TNKQ2510-0575 0022|Y
01|239830|48|1|TNKQ2510-0575 0023|Y
01|239830|50|1|TNKQ2510-0575 0024|Y
01|239830|52|1|TNKQ2510-0575 0025|Y
01|239830|54|1|TNKQ2510-0575 0026|Y
01|239830|56|1|TNKQ2510-0575 0027|Y
01|239830|58|1|TNKQ2510-0575 0028|Y
01|239830|60|1|TNKQ2510-0575 0029|Y
01|239830|62|1|TNKQ2510-0575 0030|Y
01|239830|64|1|TNKQ2510-0575 0031|Y
01|239830|66|1|TNKQ2510-0575 0040 - please note these are considered|Y
01|239830|66|2|special and cannot be cancelled or return upon PO/order|Y
01|239830|66|3|issued.|Y
01|239830|68|1|TNKQ2510-0575 0041 - please note these are considered|Y
01|239830|68|2|special and cannot be cancelled or return upon PO/order|Y
01|239830|68|3|issued.|Y
01|239830|70|1|TNKQ2510-0575 0042 - please note these are considered|Y
01|239830|70|2|special and cannot be cancelled or return upon PO/order|Y
01|239830|70|3|issued.|Y
01|239830|72|1|TNKQ2510-0575 0043 - please note these are considered|Y
01|239830|72|2|special and cannot be cancelled or return upon PO/order|Y
01|239830|72|3|issued.|Y
01|239830|77|1|TNKQ2510-0575 0044 - Nikken boring bar/BT50-RAC180-185|Y
01|239830|77|2|- please note these are considered special and cannot|Y
01|239830|77|3|be cancelled or return upon PO/order issued.|Y
01|239835|1|1|This item is special - it cannot be cancelled or|Y
01|239835|1|2|returned upon receipt of PO|Y
01|239838|1|1|Estimated lead time is 14~16 weeks after receipt of|Y
01|239838|1|2|an order.  This item is special non-standard stock|Y
01|239838|1|3|once a Purchase Order has been received this item|Y
01|239838|1|4|cannot be cancelled or returned.|Y
01|239856|1|1|TNKQ2510-0559 0001|Y
01|239856|3|1|TNKQ2510-0559 0002|Y
01|239867|1|1|1st Batch/DWG FW'd to TR & saved in Teams File.|N
01|239869|4|1|This item is special non-standard stock.  Once a|Y
01|239869|4|2|Purchase Order has been received this item cannot be|Y
01|239869|4|3|cancelled or returned.|Y
01|239914|2|1|SY20-120|Y
01|239914|2|2|Centering Holder OD:20mm|Y
01|239925|1|1|NC4001-22-50CP|Y
01|239925|1|2|NCAT40 DualContact Shell Mill Holder 22mm CoolantPorts|Y
01|239925|1|3|Quoted at NET price.|Y
01|239925|2|1|NC4001-22-100CP|Y
01|239925|2|2|NCAT40 DualContact Shell Mill Holder 22mm CoolantPorts|Y
01|239925|2|3|Quoted at NET price.|Y
01|239925|3|1|NC4001-22-150CP|Y
01|239925|3|2|NCAT40 DualContact Shell Mill Holder 22mm CoolantPorts|Y
01|239925|3|3|Quoted at NET price.|Y
01|239926|2|1|Promotion core buy back only applies to one table|Y
01|239928|1|1|*Over 450 pcs in stock|Y
01|239929|2|1|LN to make block after receipt of necessary spindle|Y
01|239929|2|2|specs for design|Y
01|239934|5|1|Discount is based upon the purchase of one tube per|Y
01|239934|5|2|holder. If they request more please let me know so|Y
01|239934|5|3|I can re-quote.|Y
01|239940|3|1|Estimated lead time is end of December 2025.|Y
01|239941|2|1|LN to make block after receipt of necessary spindle|Y
01|239941|2|2|specs for design|Y
01|239953|1|1|ETA 2-3 weeks|Y
01|239953|2|1|3 Months|Y
01|239974|3|1|Please note this is considered special. Once PO/order|Y
01|239974|3|2|issued these cannot be cancelled or returned.|Y
01|239998|1|1|CAT50-SF0312-6.30CP|Y
01|239998|1|2|CAT50 Shrink Fit Holder 5/16 CoolantPorts 25K|Y
01|239998|1|3|Please note: This tool is considered Special: We will|Y
01|239998|1|4|supply and approval drawing for signature if this|Y
01|239998|1|5|becomes an order. Once a purchase order is placed it|Y
01|239998|1|6|cannot be cancelled or returned.|Y
01|240005|1|1|Discontinued - non-cancellable non-returnable item|Y
01|240019|3|1|Installation Includes drive unit short bar|Y
01|240019|3|2|fiber optic cable bulkhead cables external cables|Y
01|240019|3|3|and cable management|Y
01|240019|3|4|Machine dealer responsibility:|Y
01|240019|3|5|Machine must be capable of adding the additional axis|Y
01|240019|3|6|additional axis ladder Fanuc software option|Y
01|240019|3|7|rotary table fit to the machine table|Y
01|240021|1|1|AC003009  RFID BIS-C-122-04/L installed and holder|Y
01|240021|1|2|re-balanced.|Y
01|240021|1|3|Quoted at NET each.|Y
01|240037|3|1|Estimated lead time is end of November/early December.|Y
01|240056|1|1|RGA#LVR-62400/|Y
01|240056|1|2|Repair of MZMP47-MI50X-OFF-C S/N:4300001 (Mim#123684)|Y
01|240056|2|1|Bearing seals and o-rings to be replaced|Y
01|240060|1|1|Please note this is considered special and has been|Y
01|240060|1|2|quoted at special net price. Once PO/order issued this|Y
01|240060|1|3|cannot be cancelled or returned.|Y
01|240069|1|1|**NET PRICE** Special non-standard stock - cannot|Y
01|240069|1|2|be cancelled or returned upon receipt of PO|Y
01|240083|2|1|OPTIONAL SCROLL CHUCK KIT|Y
01|240083|3|1|OPTIONAL TAILSTOCK|Y
01|240089|6|1|Requested this holder with coolant ports - quoted at|Y
01|240089|6|2|special net price of $226...these cannot be cancelled|Y
01|240089|6|3|or returned upon receipt of PO/order.|Y
01|240097|1|1|SN#6637 CNC501TFA10+1 RGA#TAR-62448 Nidec OKK USA|Y
01|240097|1|2|OKK HPM40 SN 121 MA88518|Y
01|240097|1|3|Total Net price of overhaul for the captioned RT|Y
01|240105|1|1|RGA#LVR-62304/|Y
01|240105|1|2|Repair of OKU-L370-X S/N:A1287 AL769|Y
01|240105|1|3|Repair of OKU-L370-Z S/N:AL585|Y
01|240105|2|1|Bearings seals o-rings and collet nut|Y
01|240105|2|2|OKU-L370-X S/N:AL1287|Y
01|240105|3|1|Bearings seals o-rings and collet nut|Y
01|240105|3|2|OKU-L370-X S/N:AL769|Y
01|240105|4|1|Bearings seals o-rings and collet nut|Y
01|240105|4|2|OKU-L370-Z S/N:AL585|Y
01|240106|2|1|INCLUDES INSTALLING AUTODOOR ON CNC MACHINE.|Y
01|240106|2|2|AND WIRING THE AUTODOOR INTO THE CNC|Y
01|240106|2|3|MACHINE OR MACHINE TENDING SOLUTION AS REQUIRED|Y
01|240106|2|4|ALSO INCLUDES TRAVEL AND MISC EXPENSES.|Y
01|240107|6|1|Please note this is considered special and non-standard|Y
01|240107|6|2|stock. Once PO/order issued these cannot be cancelled|Y
01|240107|6|3|or returned.|Y
01|240116|1|1|2 pc. 11/14|Y
01|240116|1|2|3 pc. 11/21|Y
01|240124|1|1|This item is considered custom - cannot be cancelled|Y
01|240124|1|2|or returned upon receipt of order|Y
01|240124|2|1|**NET charge** LN to thread drawtube after the receipt|Y
01|240124|2|2|of spindle specs|Y
01|240125|1|1|Includes T-slotted face plate and 9+1 RJ and hard wired|Y
01|240125|1|2|cables.|Y
01|240151|1|1|*70mm Center Height|Y
01|240151|2|1|*85mm Center Height|Y
01|240156|4|1|Estimated delivery is end of December/mid January.|Y
01|240156|21|1|Currently two (2) in stock.  Additional stock at|Y
01|240156|21|2|factory.  Estimated lead time is 3~4 weeks after|Y
01|240156|21|3|receipt of an order.|Y
01|240163|1|1|Quoted at NET price|Y
01|240168|1|1|No Ins. Required.|Y
01|240168|2|1|No Ins. Required.|Y
01|240168|3|1|No Ins. Required.|Y
01|240168|4|1|No Ins. Required.|Y
01|240168|5|1|No Ins. Required.|Y
01|240168|6|1|No Ins. Required.|Y
01|240168|7|1|No Ins. Required.|Y
01|240168|8|1|No Ins. Required.|Y
01|240168|9|1|No Ins. Required.|Y
01|240168|10|1|No Ins. Required.|Y
01|240168|11|1|No Ins. Required.|Y
01|240168|12|1|No Ins. Required.|Y
01|240168|13|1|No Ins. Required.|Y
01|240169|1|1|Estimated delivery is early/mid December.|Y
01|240169|8|1|Estimated delivery is end of November/early December.|Y
01|240172|1|1|No Ins. Required.|Y
01|240172|2|1|No Ins. Required.|Y
01|240172|3|1|No Ins. Required.|Y
01|240172|4|1|No Ins. Required.|Y
01|240172|5|1|No Ins. Required.|Y
01|240172|6|1|No Ins. Required.|Y
01|240172|7|1|No Ins. Required.|Y
01|240172|8|1|No Ins. Required.|Y
01|240172|9|1|No Ins. Required.|Y
01|240172|10|1|No Ins. Required.|Y
01|240172|11|1|No Ins. Required.|Y
01|240172|12|1|No Ins. Required.|Y
01|240172|13|1|No Ins. Required.|Y
01|240172|14|1|No Ins. Required.|Y
01|240172|15|1|No Ins. Required.|Y
01|240172|16|1|No Ins. Required.|Y
01|240172|17|1|No Ins. Required.|Y
01|240172|18|1|No Ins. Required.|Y
01|240172|19|1|No Ins. Required.|Y
01|240172|20|1|No Ins. Required.|Y
01|240172|21|1|No Ins. Required.|Y
01|240172|22|1|No Ins. Required.|Y
01|240172|23|1|No Ins. Required.|Y
01|240172|24|1|No Ins. Required.|Y
01|240172|25|1|No Ins. Required.|Y
01|240172|26|1|No Ins. Required.|Y
01|240172|27|1|No Ins. Required.|Y
01|240172|28|1|No Ins. Required.|Y
01|240172|29|1|No Ins. Required.|Y
01|240175|1|1|1st Batch/TomD/OSS Kit&Stock|Y
01|240175|2|1|1st Batch/TomD/OSS Kit&Stock|Y
01|240175|3|1|1st Batch/TomD/OSS Kit&Stock|Y
01|240175|4|1|1st Batch/TomD/OSS Kit&Stock|Y
01|240205|1|1|Special - **non-cancellablenon-returnable item**|Y
01|240211|1|1|No Ins. Required|Y
01|240211|2|1|No Ins. Required|Y
01|240211|3|1|No Ins. Required|Y
01|240211|4|1|No Ins. Required|Y
01|240211|5|1|No Ins. Required|Y
01|240211|6|1|No Ins. Required|Y
01|240218|1|1|**NET Price** Special - non-cancellable non-returnable|Y
01|240218|1|2|item|Y
01|240229|1|1|This part includes the torque wrench & and torque|Y
01|240229|1|2|wrench head (GH10-TLS-HD).|Y
01|240232|1|1|1st Batch/TomD|Y
01|240248|3|1|Delivery: 25pcs STOCK Balance 20 Wks|Y
01|240250|1|1|RGA#TOR-62393|Y
01|240250|1|2|Repair of SF-START2-UNIT-200|Y
01|240257|1|1|BOM: PRE-E46-BAT1-BD + PRE-SPDL-C6RMA|N
01|240257|1|2|Eric said to put on quote log.|N
01|240257|5|1|Quoted at NET Pricing and cannot be discounted.|Y
01|240259|4|1|20% Discount taken from List Price|Y
01|240259|4|2|List Price = $4533 ea.|Y
01|240259|5|1|20% Discount taken from List Price|Y
01|240259|5|2|List Price  = $2539 ea.|Y
01|240259|9|1|Receive 20% off of comparable tool with your CORE|Y
01|240259|9|2|tool!  Broken beat whatever!|Y
01|240259|9|3|Provide tool to your local Nikken Representative|Y
01|240262|1|1|AV000102|Y
01|240262|1|2|CAT50-C1-135UG-IDI CAT50 Milling Chuck 1 15K RPM|Y
01|240262|1|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|240262|2|1|AV000103  CAT50-C1.1/4-135UG-IDI|Y
01|240262|2|2|CAT50 Milling Chuck 1.1/4 HiSpeed ChipHole 15K|Y
01|240262|2|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|240262|2|4|Quoted at NET price.|Y
01|240262|3|1|AV000128 CAT50 BullsEye ZeroFit Slim Chuck SK6 Built In|Y
01|240262|3|2|Chip 10K|Y
01|240262|3|3|BIS-C-122-04/L installed and holder re-balanced.|Y
01|240262|3|4|Quoted at NET price.|Y
01|240265|1|1|Special Item Not Returnable Or Cancelable|Y
01|240271|1|1|Not Returnable Or Cancelable|Y
01|240273|1|1|Not Returnable Or Cancelable|Y
01|240274|1|1|Not Returnable Or Cancelable|Y
01|240280|1|1|B4006-0125-2.36 w/ DIN modification - quoted at special|Y
01|240280|1|2|net price...once PO/order issued these cannot be|Y
01|240280|1|3|cancelled or returned.|Y
01|240280|3|1|B4006-0187-2.50 w/ DIN modification - quoted at special|Y
01|240280|3|2|net price...once PO/order issued these cannot be|Y
01|240280|3|3|cancelled or returned.|Y
01|240287|1|1|20% OVERSTOCK Promotion applied|Y
01|240287|1|2|This item cannot be canceled or returned|Y
01|240293|1|1|Currently two in stock estimated lead time on balance|Y
01|240293|1|2|is 4~6 weeks after receipt of an order.|Y
01|240293|32|1|Estimated lead time is 10~12 weeks after receipt of an|Y
01|240293|32|2|order.|Y
01|240293|36|1|Currently four (4) in stock at the factory.  Estimated|Y
01|240293|36|2|lead time is 2~3 weeks after receipt of an order.|Y
01|240293|36|3|PLEASE NOTE:  This item is special.  Once a Purchase|Y
01|240293|36|4|order is received this item cannot be cancelled or|Y
01|240293|36|5|returned.|Y
01|240293|37|1|Currently three (3) in stock at the factory.  Estimated|Y
01|240293|37|2|lead time would be 2~3 weeks after receipt of an order.|Y
01|240293|37|3|If more than one is needed I will need to check|Y
01|240293|37|4|delivery with Purchasing Team.|Y
01|240293|40|1|Currently stock at the factory.  Estimated lead time is|Y
01|240293|40|2|2~3 weeks after receipt of an order.  PLEASE NOTE: This|Y
01|240293|40|3|items is special.  Once a Purchase Order is received|Y
01|240293|40|4|this item cannot be cancelled or returned.|Y
01|240293|41|1|Currently three in stock at the factory.  Estimated|Y
01|240293|41|2|lead time is 2~3 weeks after receipt of an order.|Y
01|240293|43|1|Estimated lead time is 10~12 weeks after receipt of an|Y
01|240293|43|2|order.  This item is special and once a Purchase Order|Y
01|240293|43|3|has been received this item cannot be cancelled or|Y
01|240293|43|4|returned.|Y
01|240321|1|1|Hathor Six A Presetter SN#6915|Y
01|240321|1|2|Calibration Service Call|Y
01|240323|1|1|Please note this is considered special & non-standard|Y
01|240323|1|2|stock. Once PO/order issued these cannot be cancelled|Y
01|240323|1|3|or returned.|Y
01|240324|1|1|SN#43137TC CNC202-2W-250BFA-M RGA#TAR-62344|Y
01|240338|1|1|4 pieces per set For Model#5AX-4MT-105-120FA|Y
01|240338|2|1|12 pieces per set|Y
01|240338|3|1|4 pieces per set|Y
01|240338|4|1|4 pieces per set|Y
01|240338|5|1|4 pieces per set|Y
01|240338|6|1|4 pieces per set|Y
01|240338|7|1|4 pieces per set|Y
01|240338|8|1|32 pieces per set|Y
01|240342|1|1|Includes external cables|Y
01|240374|2|1|Lead time is 3~5 days after design approval.|Y
01|240374|2|2|Quoted at NET Pricing.|Y
01|240376|1|1|Mimatic P/N: 156208  Test Bar|Y
01|240395|2|1|Additional 20% discount applied to this holder that is|Y
01|240395|2|2|on the Overstock Promotion.  Once a Purchase Order has|Y
01|240395|2|3|been received this item cannot be cancelled or|Y
01|240395|2|4|returned.|Y
01|240408|2|1|Quoted at NET price.|Y
01|240410|1|1|Delivery: 40pcs STOCK 20pcs 3-4Wks Balance 23-25 Wks|Y
01|240423|2|1|Estimated delivery due in november|Y
01|240434|1|1|Part Number: TBD|Y
01|240434|1|2|BT30 32mm Shell Mill Holder CoolantPorts 60mm G/l|Y
01|240434|1|3|Quantity Breaks:|Y
01|240434|1|4|2+ pcs: $174.00/EA|Y
01|240434|1|5|4+ pcs: $164.00/EA|Y
01|240435|52|1|This item is special non-standard stock once a|Y
01|240435|52|2|Purchase Order has been received this item cannot be|Y
01|240435|52|3|cancelled or returned.|Y
01|240435|53|1|This item is special non-standard stock.  Once a|Y
01|240435|53|2|Purchase Order has been received this item cannot be|Y
01|240435|53|3|cancelled or returned.|Y
01|240435|54|1|This item is special non-standard stock.  Once a|Y
01|240435|54|2|Purchase Order has been received this item cannot be|Y
01|240435|54|3|cancelled or returned.|Y
01|240435|57|1|Estimated delivery is end of February/early March.|Y
01|240435|64|1|This item is special non-standard stock.  Once a|Y
01|240435|64|2|Purchase Order has been received this item cannot be|Y
01|240435|64|3|cancelled or returned.|Y
01|240435|65|1|This item is special non-standard stock.  Once a|Y
01|240435|65|2|Purchase Order has been received this item cannot be|Y
01|240435|65|3|cancelled or returned.|Y
01|240435|66|1|This item is special non-standard stock.  Once a|Y
01|240435|66|2|Purchase Order has been received this item cannot be|Y
01|240435|66|3|cancelled or returned.|Y
01|240435|68|1|This item is special non-standard stock.  Once a|Y
01|240435|68|2|Purchase Order has been received this item cannot be|Y
01|240435|68|3|cancelled or returned.|Y
01|240435|69|1|This item is special non-standard stock.  Once a|Y
01|240435|69|2|Purchase Order has been received this item cannot be|Y
01|240435|69|3|cancelled or returned.|Y
01|240435|70|1|This item is special non-standard stock.  Once a|Y
01|240435|70|2|Purchase Order has been received this item cannot be|Y
01|240435|70|3|cancelled or returned.|Y
01|240435|70|4|CURRENTLY THREE (3) IN STOCK AT THE FACTORY.|Y
01|240435|71|1|This item is special non-standard stock.  Once a|Y
01|240435|71|2|Purchase Order has been received this item cannot be|Y
01|240435|71|3|cancelled or returned.|Y
01|240435|77|1|This item is special non-standard stock.  Once a|Y
01|240435|77|2|Purchase Order has been received this item cannot be|Y
01|240435|77|3|cancelled or returned.|Y
01|240435|78|1|This item is special non-standard stock.  Once a|Y
01|240435|78|2|Purchase Order has been received this item cannot be|Y
01|240435|78|3|cancelled or returned.|Y
01|240451|2|1|Please note additional 20% applied per overstock promo.|Y
01|240451|2|2|Once PO/order issued these cannot be cancelled or|Y
01|240451|2|3|returned. These will needed to be requoted for price &|Y
01|240451|2|4|availability upon stock depletion.|Y
01|240455|1|1|Mori Seiki SL-253 Live ER32 Axial Tool|Y
01|240455|3|1|Mori Seiki SL-253 Live ER32 Radial Tool|Y
01|240462|4|1|Estimated lead time is 10~12 weeks after receipt of an|Y
01|240462|4|2|order.|Y
01|240463|1|1|Quoted at NET pricing|Y
01|240465|2|1|OVERSTOCK - EXTRA 20% Special Discount|Y
01|240478|4|1|LN to make positioning block - 3-5 days after receipt|Y
01|240478|4|2|of specs necessary for design|Y
01|240478|4|3|**non-cancellable non-returnable**|Y
01|240504|1|1|This package includes travel time (16 hours) for two|Y
01|240504|1|2|technicians one day of labor report preparation and|Y
01|240504|1|3|related expenses. For the 25 tables currently at AAC|Y
01|240504|1|4|the inspection is expected to be completed within one|Y
01|240504|1|5|day by two technicians. (Requires two technicians)|Y
01|240504|1|6|The technicians will check the backlash and overall|Y
01|240504|1|7|condition of each table and will submit a detailed|Y
01|240504|1|8|report afterward.|Y
01|240509|2|1|Additional 20% discount applied for our Overstock|Y
01|240509|2|2|Promotion.  Once a Purchase Order is received this|Y
01|240509|2|3|item cannot be cancelled or returned.  We currently|Y
01|240509|2|4|have one (1) in stock.|Y
01|240519|1|1|Delivery: Upon receicpt of PO expect 3-4wks mfg +|Y
01|240519|1|2|shipping time|Y
01|240529|1|1|No Inspection needed|Y
01|240529|2|1|No Inspection needed|Y
01|240543|1|1|Please note pricing reflects full PO and purchase of|Y
01|240543|1|2|4 pieces.|Y
01|240545|1|1|Quoted at Net price.|Y
01|240548|1|1|W/ PS-N46E installed at factory|Y
01|240548|3|1|Installed on NC5-46-C25-90 at factory|Y
01|240549|3|1|5 pieces ship 1wk; bal 3wks|Y
01|240550|1|1|Plugging DIN Hole  Addition of 2 hole coolant ports|Y
01|240550|1|2|**NET PRICE** Custom - cannot be cancelled or returned|Y
01|240550|1|3|upon receipt of a PO.|Y
01|240550|1|4|LN to handle shipping charges.|Y
01|240553|1|1|Stock for EB|N
01|240556|1|1|Discontinued Item - cannot be cancelled or returned.|Y
01|240556|1|2|Additional 20% Overstock Promo Discount applied.|Y
01|240559|1|1|Please note this is non-standard stock & considered|Y
01|240559|1|2|special. Once PO/order issued these cannot be|Y
01|240559|1|3|cancelled or returned.|Y
01|240559|3|1|Please note this is non-standard stock & considered|Y
01|240559|3|2|special. Once PO/order issued these cannot be|Y
01|240559|3|3|cancelled or returned.|Y
01|240559|7|1|Please note this is non-standard stock & considered|Y
01|240559|7|2|special. Once PO/order issued these cannot be|Y
01|240559|7|3|cancelled or returned.|Y
01|240560|1|1|RGA#LVR-62421/|Y
01|240560|1|2|Repair of MZMP5-ER40X-OFF-C S/N:59128 02 (Mim#131556)|Y
01|240560|2|1|Bearings seals and o-rings to be replaced|Y
01|240565|1|1|RGA#CUR-62342/|Y
01|240565|1|2|Repair of PA110-CAT S/N:23906874 03 (Mim#162745)|Y
01|240565|2|1|Spring o-ring eccentric cam bolts to be replaced|Y
01|240565|3|1|RGA#CUR-62342/|Y
01|240565|3|2|Repair of MRAM-ER25-IC S/N:22907103 02 (Mim#162765)|Y
01|240565|4|1|Bearings seals and o-rings to be replaced|Y
01|240566|1|1|P/N: C5007-0032-15.00|Y
01|240566|1|2|CAT50 er32 collet chuck with 15.00 gauge length|Y
01|240568|1|1|RGA#CUR-62342/|Y
01|240568|1|2|Repair of PA110-CAT S/N:23906874 03 (Mim#162745)|Y
01|240568|2|1|Spring o-ring eccentric cam bolts to be replaced|Y
01|240571|1|1|Please note these have been quoted at special net price|Y
01|240571|1|2|and are considered specials. Once PO/order issued|Y
01|240571|1|3|these cannot be cancelled or returned.|Y
01|240575|1|1|R/T: if12A06B-2243-B100|Y
01|240575|2|1|R: if22 A06B-2247-B100 T: If40 A06B-2257-B100|Y
01|240576|1|1|RGA#TAR-62243|Y
01|240576|1|2|CNCZ302FA|Y
01|240576|1|3|SN: 7007|Y
01|240577|5|1|POLY-WRAPPED EXTERNAL POWER/FEEDBACK CABLES FOR 4TH|Y
01|240577|5|2|AXIS ROTARY TABLE BEING INSTALLED ON OKUMA M560V|Y
01|240594|1|1|H10ARAM-ER32-190IC-80TP|N
01|240594|26|1|PA80-BT/HSK-H10ARAM|N
01|240597|1|1|**Once modified cannot be cancelled or returned**|Y
01|240597|2|1|**NET PRICE** Labor cost to ship C4005-0562-3.98(C)|Y
01|240597|2|2|disassembled.|Y
01|240600|1|1|On-Site RT Inspection Package Midwest|Y
01|240600|1|2|Travel/2 days for a round trip (from/to IL)|Y
01|240600|1|3|Labor/Exp for 2 days work with 2 heads|Y
01|240600|1|4|Includes: Accomodation|Y
01|240600|1|5|Extra fee: Anything goes beyond above-mentioned|Y
01|240600|1|6|time period and tasks will be additionally charged|Y
01|240600|1|7|......................................................|Y
01|240600|1|8|Subject RTs:|Y
01|240600|1|9|CNC302FA / CNC401TFA / CNC501TFA|Y
01|240604|4|1|SF-START2-UNIT-200 SN: 2J0108|Y
01|240604|4|2|USED DEMO UNIT 208-230vac 3PHASE|Y
01|240604|4|3|INCLUDES (2) HSK63A POTS MANUAL AND ACCESSORIES|Y
01|240604|7|1|List = $7941|Y
01|240604|11|1|Location Bushing Set w/ DIN 12.9 SHCS Shoulder bolt|Y
01|240604|11|2|5 pcs per kit. 1 kit per rail|Y
01|240606|1|1|Final Part# TBD **NET PRICE**|Y
01|240606|1|2|C5-SK6-60-EU w/ smooth nut SKN-10K(GH)|Y
01|240606|1|3|No rebalance|Y
01|240606|2|1|Final Part# TBD **NET PRICE**|Y
01|240606|2|2|C5-SK10-60-EU w/ smooth nut SKN-10K(GH)|Y
01|240606|2|3|No rebalance|Y
01|240606|3|1|Final Part# TBD **NET PRICE**|Y
01|240606|3|2|C5-SK16-60-EU w/ smooth nut SKN-16B(GH)|Y
01|240606|3|3|No rebalance|Y
01|240610|7|1|Estimated lead time is end of December/beginning of|Y
01|240610|7|2|January after receipt of an order.|Y
01|240610|10|1|Currently two (2) in stock at the factory.  Estimated|Y
01|240610|10|2|lead time on the balance of six (6) is 18~20 weeks|Y
01|240610|10|3|after receipt of an order.|Y
01|240610|11|1|Currently five (5) in stock in Illinois.  Estimated|Y
01|240610|11|2|lead time for the balance of three (3) is 18~20 weeks|Y
01|240610|11|3|after receipt of an order.|Y
01|240627|2|1|Discontinued - cannot be cancelled or returned|Y
01|240627|2|2|Additional 20% Overstock Promo discount applied|Y
01|240627|3|1|Applicable to 050-021|Y
01|240630|1|1|BT40-ZDS12-90 Nikken Dream Synchro Tap Holder|Y
01|240630|3|1|BT40-ZDS16-100 Nikken Dream Synchro Tap Holder|Y
01|240630|5|1|ZDK12-10-50L-J Nikken Dream Synchro Tap Collet|Y
01|240630|8|1|ZDK14-14-50L-J Nikken Synchro Tap Collet|Y
01|240636|1|1|Final Part # TBD **NET PRICE**|Y
01|240636|1|2|BT50 Master to C5|Y
01|240636|1|3|Special - cannot be cancelled or returned after|Y
01|240636|1|4|receipt of a PO|Y
01|240639|15|1|CKFN12-8C|Y
01|240639|29|1|CKFN16-6C|Y
01|240639|30|1|CKFN16-8C|Y
01|240639|35|1|HSK50E-C20-95G|Y
01|240639|35|2|HSK50E Milling Chuck 20mm HiSpeed 25K|Y
01|240645|5|1|Estimated shipping cost to|Y
01|240645|5|2|Santa Teresa NM 88008 USA|Y
01|240645|5|3|Final cost will be confirmed when PO is received|Y
01|240645|5|4|and confirmed by our CS department|Y
01|240664|10|1|Currently one (1) in stock at the factory.  Estimated|Y
01|240664|10|2|lead time is 2~3 weeks after receipt of an order. Lead|Y
01|240664|10|3|time for the balance is 14~16 weeks.|Y
01|240664|11|1|Currently two (2) in stock in Illinois.  Estimated|Y
01|240664|11|2|lead time for any additional collet sleeves is 2~3|Y
01|240664|11|3|weeks after receipt of an order.|Y
01|240664|13|1|Estimated lead time is 2~3 weeks after receipt of an|Y
01|240664|13|2|order.  PLEASE NOTE:  THIS ITEM IS SPECIAL.  ONCE A|Y
01|240664|13|3|PURCHASE ORDER HAS BEEN RECEIVED THIS ITEM CANNOT BE|Y
01|240664|13|4|CANCELLED OR RETURNED.|Y
01|240664|14|1|Estimated lead time is 2~3 weeks after receipt of an|Y
01|240664|14|2|order.  PLEASE NOTE: THIS ITEM IS SPECIAL.  ONCE A|Y
01|240664|14|3|PURCHASE ORDER HAS BEEN RECEIVED THIS ITEM CANNOT BE|Y
01|240664|14|4|CANCELLED OR RETURNED.|Y
01|240664|35|1|Currently one (1) in stock at the factory.  Estimated|Y
01|240664|35|2|lead time is 2~3 weeks after receipt of an order.  If|Y
01|240664|35|3|more than one is ordered estimated lead time is 14~16|Y
01|240664|35|4|weeks.|Y
01|240664|36|1|Currently two (2) in stock in Illinois.  Estimated|Y
01|240664|36|2|lead time for any additional collet sleeves is 2~3|Y
01|240664|36|3|weeks after receipt of an order.|Y
01|240664|38|1|Estimated lead time is 2~3 weeks after receipt of an|Y
01|240664|38|2|order.  PLEASE NOTE:  THIS ITEM IS SPECIAL.  ONCE A|Y
01|240664|38|3|PURCHASE ORDER HAS BEEN RECEIVED THIS ITEM CANNOT|Y
01|240664|38|4|BE CANCELLED OR RETURNED.|Y
01|240664|39|1|Estimated lead time is 2~3 weeks after receipt of an|Y
01|240664|39|2|order.  PLEASE NOTE: THIS ITEM IS SPECIAL. ONCE A|Y
01|240664|39|3|PURCHASE ORDER HAS BEEN RECEIVED THIS ITEM CANNOT|Y
01|240664|39|4|BE CANCELLED OR RETURNED.|Y
01|240667|1|1|Discontinued Item - **Cannot be cancelled or returned**|Y
01|240680|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|240680|4|2|MADE TO LENGTH FOR OKUMA M560V|Y
01|240692|2|1|Quoted at NET pricing|Y
01|240698|1|1|QUOTED AT NET PRICING FOR 2PCS|Y
01|240700|1|1|HSK63T-SLT25-105|Y
01|240701|1|1|Without motors or scale.|Y
01|240701|1|2|Delivery 6-months plus shipping|Y
01|240704|5|1|SK40 Shrink Fit Holder 6 mm Projection length 120 mm|Y
01|240706|1|1|HSK40A-SM27-60cp|Y
01|240708|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|240710|1|1|Quoted at NET pricing|Y
01|240715|3|1|Currently three (3) in stock.|Y
01|240715|5|1|Currently one (1) in stock.|Y
01|240715|10|1|Currently seven (7) in stock.|Y
01|240715|13|1|Currently six (6) in stock.|Y
01|240721|1|1|Custom set of cables - direct mount yellow - 5AX-201FAM|Y
01|240721|1|2|One Set Per Axis - Will need 2pcs for full table.|Y
01|240727|1|1|Universal Flexhead|Y
01|240727|1|2|Cat50 with UNC thread|Y
01|240727|1|3|ER40 (4.00-26.00mm) tooling interface|Y
01|240727|6|1|A tariff surcharge may be added to this quotation in|Y
01|240727|6|2|the event of a sustained tariff increase on the|Y
01|240727|6|3|importation of this product.  Any surcharge will be|Y
01|240727|6|4|disclosed prior to acceptance of an order.|Y
01|240729|1|1|Universal Flexhead|Y
01|240729|1|2|Cat50 with UNC thread|Y
01|240729|1|3|ER40 (4.00-26.00mm) tooling interface|Y
01|240729|6|1|A tariff surcharge may be added to this quotation in|Y
01|240729|6|2|the event of a sustained tariff increase on the|Y
01|240729|6|3|importation of this product.  Any surcharge will be|Y
01|240729|6|4|disclosed prior to acceptance of an order.|Y
01|240731|1|1|Universal Flexhead|Y
01|240731|1|2|Cat50 with UNC thread|Y
01|240731|1|3|ER40 (4.00-26.00mm) tooling interface|Y
01|240733|4|1|SK40-SF6-120|Y
01|240736|1|1|Final Part# C5006-0625-8.00CP-M  **NET Price**|Y
01|240736|1|2|CAT50 End Mill Holder 5/8 25K w/ Coolant Ports|Y
01|240736|1|3|**non-cancellable non-returnable**|Y
01|240744|1|1|RGA#TOR-62393|Y
01|240744|1|2|Repair of SF-START2-UNIT-200|Y
01|240752|1|1|Quote at NET pricing|Y
01|240752|1|2|Item is non-standard stock once PO has been|Y
01|240752|1|3|received it can not be cancelled or returned|Y
01|240757|1|1|HSK63F-SM0750-2.00...|Y
01|240757|1|2|HSK63F 3/4 shell mill stubby with 2 gage length|Y
01|240761|1|1|RGA#TOR-62433|Y
01|240761|1|2|Repair of SF-START2-UNIT-200 SN:2J7032|Y
01|240770|74|1|A tariff surcharge of 8% will be added to every order|Y
01|240770|74|2|placed after September 1st 2025(until further notice)|Y
01|240770|74|3|This surcharge will be acknowledged upon acceptance|Y
01|240771|76|1|A tariff surcharge of 8% will be added to every order|Y
01|240771|76|2|placed after September 1st 2025(until further notice)|Y
01|240771|76|3|This surcharge will be acknowledged upon acceptance|Y
01|240772|58|1|A tariff surcharge of 8% will be added to every order|Y
01|240772|58|2|placed after September 1st 2025(until further notice)|Y
01|240772|58|3|This surcharge will be acknowledged upon acceptance|Y
01|240773|1|1|Repeat SP. No INS req'd.|Y
01|240775|1|1|SN:5449 Current EDM|Y
01|240775|1|2|RGA#TAR-62333 5AX-201ZA|Y
01|240777|1|1|T/P Inspection Required|Y
01|240788|2|1|POSITIONING BLOCK FOR HAAS DM-3 CAT40 MACHINE|Y
01|240792|1|1|Stock subject prior to sale or 3-5 weeks.|Y
01|240792|7|1|Pre-setter spindle HSK63F|Y
01|240792|7|2|with drive pin holes|Y
01|240792|9|1|Pre-setter spindle HSK80F|Y
01|240792|9|2|w/ drive pin holes|Y
01|240799|2|1|Quoted at NET price and once an order is placed|Y
01|240799|2|2|it cannot be cancelled or returned.|Y
01|240800|1|1|Req.INS/OD Groove frange Dia issue|Y
01|240800|2|1|Req.INS/OD Groove frange Dia issue|Y
01|240802|1|1|Stock subject prior to sale or 3-5 weeks.|Y
01|240802|7|1|Pre-setter spindle HSK63F|Y
01|240802|9|1|Pre-setter spindle HSK80F|Y
01|240823|1|1|HSK63A-Z16-130#|Y
01|240823|2|1|ZKG16-6-50L|Y
01|240823|2|2|Net pricing|Y
01|240823|3|1|ZKG16-8-50L|Y
01|240823|3|2|Net Pricing|Y
01|240823|4|1|ZKG16-10-50L|Y
01|240823|4|2|Net Pricing|Y
01|240824|2|1|Please note additional 20% applied per overstock promo.|Y
01|240824|2|2|Once PO/order issued these cannot be cancelled or|Y
01|240824|2|3|returned.|Y
01|240836|6|1|Currently stock at the factory.  Estimated lead time|Y
01|240836|6|2|is mid-December after receipt of an order.|Y
01|240836|22|1|Currently eleven (11) in stock.  Estimated lead time|Y
01|240836|22|2|is 3~4 weeks after receipt of an order.|Y
01|240836|27|1|Requested BT30 3/4 w/ 3.543 GL - nothing available.|Y
01|240848|1|1|SN:3024E EU:Nexteer Auto|Y
01|240848|1|2|RGA#TAR-62381 CNC100LFA-M|Y
01|240849|1|1|This package includes travel time (16 hours) for two|Y
01|240849|1|2|technicians one day of labor report preparation and|Y
01|240849|1|3|related expenses. For the 25 tables currently at AAC|Y
01|240849|1|4|the inspection is expected to be completed within one|Y
01|240849|1|5|day by two technicians. (Requires two technicians)|Y
01|240849|1|6|The technicians will check the backlash and overall|Y
01|240849|1|7|condition of each table and will submit a detailed|Y
01|240849|1|8|report afterward.|Y
01|240853|1|1|SN:3023E EU:Nexteer Auto|Y
01|240853|1|2|RGA#TAR-62381 CNC100LFA-M|Y
01|240853|2|1|CNC100LFA-M Full Overhaul Repair|Y
01|240853|2|2|SN: 3023F Nexteer Auto|Y
01|240853|2|3|RGA#TAR-62381 CNC100LFA-M|Y
01|240854|1|1|*NO Coolant Ports**|Y
01|240854|2|1|*Has coolant ports*|Y
01|240872|6|1|Currently six (6) in stock.|Y
01|240872|7|1|Currently two (2) in stock.|Y
01|240875|10|1|Emergency collets require this boring ring.|Y
01|240878|1|1|No Ins. Required|Y
01|240878|2|1|No Ins. Required|Y
01|240883|1|1|Currently three (3) in stock.|Y
01|240897|1|1|Req.INS/Install E11-NUT & ER11-SCREW(C)|Y
01|240897|2|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|240897|3|1|Req.INS/Make sure A3/8-24 & 3/4-KEYSET are installed.|Y
01|240897|4|1|Req.INS/OD Groove frange Dia issue|Y
01|240897|5|1|Req.INS/OD Groove frange Dia issue|Y
01|240897|6|1|Req.INS/OD Groove frange Dia issue|Y
01|240897|7|1|Req.INS/OD Groove frange Dia issue|Y
01|240897|8|1|Req.INS/OD Groove frange Dia issue|Y
01|240897|9|1|Req.INS/OD Groove frange Dia issue|Y
01|240897|10|1|Req.INS/OD Groove frange Dia issue|Y
01|240897|11|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|240897|12|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|240897|13|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|240897|14|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|240903|1|1|EZ-AutoCart: EZ-ACART-BASE-CRX20|Y
01|240903|1|2|----------- Quantity and Pricing -----------|Y
01|240903|1|3|1 to 2: $79998.85 per unit.|Y
01|240903|1|4|3 to 5: $75685.75 per unit.|Y
01|240903|1|5|All prices are NET price.|Y
01|240903|1|6|-------------------------------------------------------|Y
01|240903|1|7|Delivery: 8 - 10 weeks(subject to change)|Y
01|240904|3|1|CUSTOM ANTI-ROTATION BLOCK FOR NX5 SPEEDER|Y
01|240904|3|2|MACHINE TOOL YEAR/MAKE/MODEL & SPINDLE FACE DRAWING|Y
01|240904|3|3|IS REQUIRED TO MAKE THIS ATTACHMENT|Y
01|240905|3|1|CUSTOM ANTI-ROTATION BLOCK FOR NX5 SPEEDER|Y
01|240905|3|2|MACHINE TOOL YEAR/MAKE/MODEL & SPINDLE FACE DRAWING|Y
01|240905|3|3|IS REQUIRED TO MAKE THIS ATTACHMENT|Y
01|240912|1|1|TNKQ2511-0203 0001|Y
01|240920|3|1|EXTERNAL POWER/FEEDBACK CABLES - OKUMA M460V 4TH AXIS|Y
01|240920|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|240920|4|2|OKUMA M460V|Y
01|240925|1|1|BT40-ZDS12-90 Nikken Dream Synchro Tap Holder|Y
01|240925|3|1|BT40-ZDS16-100 Nikken Dream Synchro Tap Holder|Y
01|240925|5|1|ZDK12-10-50L-J Nikken Dream Synchro Tap Collet|Y
01|240925|8|1|ZDK14-14-50L-J Nikken Synchro Tap Collet|Y
01|240936|1|1|Quoted at NET pricing|Y
01|240938|1|1|Q#240940|Y
01|240938|3|1|Q#240934|Y
01|240942|1|1|**cannot be cancelled or returned upon receipt of PO**|Y
01|240944|1|1|**cannot be cancelled or returned upon receipt of PO**|Y
01|240952|1|1|Quoted at NET price.|Y
01|240952|2|1|Quoted at NET price.|Y
01|240961|1|1|Please note manufacturing time is 8 working weeks plus|Y
01|240961|1|2|delivery. These are considered special items and are|Y
01|240961|1|3|quoted at special net price. Once PO/order issued|Y
01|240961|1|4|these cannot be cancelled or returned.|Y
01|240964|1|1|Estimated delivery is mid/end December.|Y
01|240965|2|1|Fit of this table must be verified|Y
01|240967|7|1|This ATC is non standard stock. Once a purchase order|Y
01|240967|7|2|is placed it cannot be cancelled or returned.|Y
01|240967|7|3|Quoted at NET price.|Y
01|240978|4|1|Used CNC180FA-M Rotary Table 2 units avail.|Y
01|240978|4|2|SN: 15663 or 17221|Y
01|240978|4|3|pricing is NET and includes local installation|Y
01|240978|4|4|Also have CNC202FA-M used $14500 installed.|Y
01|240978|4|5|Used tables carry 90 day warranty on tables|Y
01|240978|4|6|Used tables go through our standard predelivery inspect|Y
01|240978|4|7|Controls and installation backed by our standard 1 yr.|Y
01|240978|4|8|Data sheets required at PO. 4-6w standard lead time|Y
01|240981|3|1|QUOTED AT NET PRICING.|Y
01|240981|9|1|QUOTED AT NET PRICING.|Y
01|240982|1|1|Additional 20% Overstock Promo discount applied|Y
01|240982|1|2|Cannot be cancelled or returned upon receipt of PO|Y
01|240982|2|1|Applicable to BMT55-OD75X-MSD only|Y
01|240984|1|1|w/ PS-123-AIR installed at factory|Y
01|240984|2|1|Installed on NC5-46-TB40-200 at factory|Y
01|240990|2|1|HSK63F-C20-110G|Y
01|240990|7|1|HSK63F-C16-90G|Y
01|240996|1|1|Special non-standard stock - non-cancellable &|Y
01|240996|1|2|non-returnable|Y
01|240996|2|1|Special non-standard stock - non-cancellable &|Y
01|240996|2|2|non-returnable|Y
01|240996|3|1|Part# S32-SK13-250   **NET PRICE**|Y
01|240996|3|2|32mm Straight Shank Ext Slim Chuck SK13|Y
01|240996|3|3|Special non-standard stock - non-cancellable &|Y
01|240996|3|4|non-returnable|Y
01|241001|3|1|4th & 5th axis cables from Nikken Table to machine|Y
01|241001|3|2|bulkhead|Y
01|241002|1|1|Custom Jaws:Machined to customer provided print/model|Y
01|241002|1|2|Made from A2 tool steel. Quoted as a set.|Y
01|241007|1|1|Quoted at NET price.|Y
01|241007|2|1|Net Price reflects the purchase of (2) holders.|Y
01|241007|6|1|Quoted at NET price.|Y
01|241007|7|1|Quoted at NET price for 2~3 holders.|Y
01|241007|11|1|Quoted at NET price.|Y
01|241007|12|1|Net Price reflects the purchase of (3) holders.|Y
01|241007|16|1|Quoted at NET price.|Y
01|241007|17|1|Net Price reflects the purchase of (3) holders.|Y
01|241007|21|1|Quoted at NET price|Y
01|241013|1|1|Currently one (1) in stock additional stock would be|Y
01|241013|1|2|2~3 weeks after receipt of an order.|Y
01|241013|4|1|Currently four (4) in stock additional stock would be|Y
01|241013|4|2|2~3 weeks after receipt of an order.|Y
01|241013|5|1|Currently six (6) in stock additional stock would be|Y
01|241013|5|2|2~3 weeks after receipt of an order.|Y
01|241013|6|1|Currently two (2) in stock additional stock would be|Y
01|241013|6|2|2~3 weeks after receipt of an order.|Y
01|241013|7|1|Currently seven (7) in stock additional stock would be|Y
01|241013|7|2|2~3 weeks after receipt of an order.|Y
01|241013|8|1|Currently five (5) in stock additional stock would be|Y
01|241013|8|2|2~3 weeks after receipt of an order.|Y
01|241013|9|1|Currently eight (8) in stock additional stock would be|Y
01|241013|9|2|2~3 weeks after receipt of an order.|Y
01|241016|1|1|Quoted at NET price.|Y
01|241016|2|1|Net Price reflects the purchase of (2) holders.|Y
01|241016|6|1|Quoted at NET price.|Y
01|241016|7|1|Quoted at NET price for 2~3 holders.|Y
01|241016|11|1|Quoted at NET price.|Y
01|241016|12|1|Net Price reflects the purchase of (3) holders.|Y
01|241016|16|1|Quoted at NET price.|Y
01|241016|17|1|Net Price reflects the purchase of (3) holders.|Y
01|241016|21|1|Quoted at NET price.|Y
01|241021|1|1|Quoted at NET pricing|Y
01|241027|1|1|Part Number: TBD|Y
01|241027|1|2|HSK100A AngleHead ER32 Flex Internal Coolant 100 Pitch|Y
01|241027|1|3|Special Positioning Pin and support -Heller Spec.|Y
01|241027|1|4|A=90.48mm ER32 Tooling Interface (Dia. 3-20mm)|Y
01|241027|1|5|Angular Head 360Deg Adjustable Gear Ratio (n1/n2)=1:1|Y
01|241027|1|6|Max RPM: 6000RPM Weight: 18.0Kg|Y
01|241027|1|7|Delivery: 4 Weeks for Drawing procurement 10-11 Weeks|Y
01|241027|1|8|after signed approval drawing.|Y
01|241027|1|9|Qty Breaks:|Y
01|241027|1|10|2+ pcs: $23717/EA|Y
01|241029|1|1|TAR-62448 CNC501TFA10+1 SN:6100|Y
01|241035|1|1|Quantity Breaks:|Y
01|241035|1|2|1-49 pcs: $29.25/EA|Y
01|241035|1|3|50+ pcs: $28.08/EA|Y
01|241035|1|4|100+ pcs: $27.30/EA|Y
01|241038|3|1|HSK63A-C25-130# HSK63A Milling Chuck 25mm 15K|Y
01|241045|1|1|RGA#LVR-62431/|Y
01|241045|1|2|Repair of MNL12-ER40Z-ICE-10K SN:1890115804|Y
01|241045|1|3|(Mimatic#124882)|Y
01|241045|2|1|Replace All Bearings Seals and O-Rings|Y
01|241053|1|1|RGA#QUA-62375/|Y
01|241053|1|2|Repair of MNL12-SK20X-ICE-10K-J SN:2590260601|Y
01|241053|2|1|Replace All Bearings Seals and O-Rings|Y
01|241053|2|2|Assembly error at factory improper Loctite application|Y
01|241069|1|1|*3 pcs stock more expected by December 19th.|Y
01|241091|4|1|Next Air Cut is 12/1 for Mid to End Dec.|Y
01|241095|2|1|Wrench for spindle|Y
01|241095|3|1|Wrench for nut|Y
01|241098|1|1|Lead-time is 12-16 weeks ARO|Y
01|241105|1|1|Special - cannot be cancelled or returned upon receipt|Y
01|241105|1|2|of a PO|Y
01|241118|10|1|YG1 SHRINK EXTENSION EDP# VS010M|Y
01|241118|10|2|DESC: ST12-SFH3-120|Y
01|241122|2|1|EXTERNAL POWER/FEEDACK CABLES FOR 4TH/5TH FOR|Y
01|241122|2|2|OKUMA M560 VMC|Y
01|241122|3|1|A tariff surcharge may be added to this quotation in|Y
01|241122|3|2|the event of a sustained tariff increase on the|Y
01|241122|3|3|importation of this product.  Any surcharge will be|Y
01|241122|3|4|disclosed prior to acceptance of an order.|Y
01|241126|1|1|Per NERP offer NCAT50-C3/4-105U-IDU due to delivery|N
01|241128|2|1|AY0200 AIR/HYDRAULIC BOOSTER INCLUDED WITH TABLE|Y
01|241128|2|2|MACHINE INTERFACE WILL BE AIR|Y
01|241128|4|1|A tariff surcharge may be added to this quotation in|Y
01|241128|4|2|the event of a sustained tariff increase on the|Y
01|241128|4|3|importation of this product.  Any surcharge will be|Y
01|241128|4|4|disclosed prior to acceptance of an order.|Y
01|241132|1|1|Quoted at NET Price for 1 presetter.|Y
01|241132|2|1|No Charge|Y
01|241132|3|1|Quoted at NET Price|Y
01|241132|6|1|Quoted at NET Price for 3 presetters.|Y
01|241132|7|1|No Charge|Y
01|241132|8|1|Quoted at NET Price|Y
01|241132|9|1|Quoted at NET price.|Y
01|241136|1|1|CS-027-282-030|Y
01|241139|1|1|SN:2957 EU:Flowserve|Y
01|241139|1|2|RGA#TAR-62420 NST-250HP|Y
01|241145|1|1|Includes Cables from the Nikken Table to the machine|Y
01|241145|1|2|Bulkhead|Y
01|241159|2|1|Additional 20% discount has been applied for our|Y
01|241159|2|2|Overstock Promotion.  Once a Purchase Order is|Y
01|241159|2|3|received this item cannot be cancelled or returned.|Y
01|241163|5|1|Non-Pluggable CP|Y
01|241163|12|1|Stock at factory cutoff 11/24 for ETA to L-N mid Dec|Y
01|241163|16|1|Stock at factory cutoff 11/24 for ETA to L-N mid Dec|Y
01|241163|25|1|Consider Complete|Y
01|241165|7|1|Estimated lead time is mid/end December.|N
01|241165|10|1|Original request was for HSK100A-SK10C-150-IDU however|N
01|241165|10|2|we do not have that in stock only -150|N
01|241165|21|1|Estimated lead time is mid/end December.|N
01|241169|1|1|**cannot be cancelled or returned upon receipt of PO**|Y
01|241170|4|1|SF-Fi6-unit-380V sn:6M8064|Y
01|241170|4|2|Consignment unit 400-480 VAC 3phase (20a) circuit|Y
01|241170|4|3|INCLUDES (2) HSK63A POTS MANUAL AND ACCESSORIES|Y
01|241170|4|4|LIST PRICE = $24625.00|Y
01|241170|7|1|List = $7941|Y
01|241170|11|1|Location Bushing Set w/ DIN 12.9 SHCS Shoulder bolt|Y
01|241170|11|2|5 pcs per kit. 1 kit per rail|Y
01|241171|1|1|**cannot be cancelled or returned upon receipt of PO**|Y
01|241182|1|1|**Additional 5% discount applied**|Y
01|241182|1|2|Non-cancellable non-returnable item after receipt of|Y
01|241182|1|3|PO|Y
01|241182|7|1|Non-cancellable non-returnable item after receipt of|Y
01|241182|7|2|a PO|Y
01|241184|1|1|Demo Unit Special Pricing: **Additional 15% discount|Y
01|241184|1|2|applied**|Y
01|241184|1|3|Non-cancellable non-returnable item after receipt of|Y
01|241184|1|4|PO|Y
01|241184|7|1|Non-cancellable non-returnable item after receipt of|Y
01|241184|7|2|a PO|Y
01|241189|3|1|B5006-0500-3.00CP-M|Y
01|241189|3|2|BT50 End Mill Holder 1/2 25K CoolantPorts|Y
01|241192|1|1|Cosmetic Damage Special Pricing: **Additional 25%|Y
01|241192|1|2|discount applied**|Y
01|241192|1|3|Non-cancellable non-returnable item after receipt of|Y
01|241192|1|4|a PO|Y
01|241195|1|1|FOR DN SOLUTIONS DNM6700 W/ FANUC Oi-MF+|Y
01|241195|3|1|PACKAGE DISCOUNTED|Y
01|241195|7|1|NET PRICE FOR CUSTOM 1.5 TOOLING PLATE TRUNNION...|Y
01|241195|7|2|COMPATIBLE WITH CUSTOMERS EXISTING JERGENS FIXTURE...|Y
01|241195|7|3|PLATES. BALL LOCK RECEIVERS 49501 TO MATCH EXISTING...|Y
01|241195|7|4|APPROVAL DRAWINGS PROVIDED POST ORDER.|Y
01|241195|7|5|TRUNNION PACKAGE INCLUDES 105mm CHEEK PLATE 85mm...|Y
01|241195|7|6|CHEEK PLATE. 33 WIDE DUAL 16 BALL LOCK TRUNNION PLATE|Y
01|241195|7|7|PLAIN FINISH 6061 ALLOY OR TOOLING PLATE GRADE ALUM.|Y
01|241195|7|8|INCLUDES ALL MOUNTING HARDWARE 8-49501 RECEIVERS ...|Y
01|241195|7|9|2-10mm DOWELS FACEPLATE MOUNTING KITS (2) 2-2 RISERS|Y
01|241195|7|10|EXCLUDED: BALL LOCK PLATES PINS & LINERS.|Y
01|241195|8|1|ZEMAN TOOL QUOTE 250789SM (LESS RISERS)|N
01|241195|8|2|NET $9010|N
01|241195|8|3|DESIGN & ENGINEERING -DANA|N
01|241195|8|4|NET $1500|N
01|241205|5|1|Covers an estimated two day installation and training|Y
01|241206|9|1|Estimated time of arrival to Lyndex-Nikken 5/18/11|Y
01|241206|9|1|Estimated time of arrival to Lyndex-Nikken 6/3/11.|Y
01|241206|15|1|Three pieces in stock. Estimated time of arrival to|Y
01|241206|15|2|Lyndex-Nikken is 6/6/11.|Y
01|241206|23|1|2 pieces in stock. Estimated time of arrival to|Y
01|241206|23|2|Lyndex-Nikken 6/3/11.|Y
01|241206|33|1|Estimated delivery to Lyndex-Nikken 5/18/11.|Y
01|241206|35|1|Estimated date of delivery to Lyndex-Nikken 5/18/11.|Y
01|241212|2|1|Machine must be capable of adding 2 additional axis|Y
01|241212|2|2|Ladder and software must be present for 2 additional|Y
01|241212|2|3|axis.|Y
01|241220|1|1|Please note these are considered specials and have|Y
01|241220|1|2|been quoted at special net price. Once PO/order issued|Y
01|241220|1|3|these cannot be cancelled or returned.|Y
01|241233|1|1|Includes Cables from the Nikken Table to the machine|Y
01|241233|1|2|Bulkhead|Y
01|241242|2|1|Additional 20% discount applied for our Overstock|Y
01|241242|2|2|Promotion.  Once a Purchase Order has been received|Y
01|241242|2|3|this item cannot be cancelled or returned.|Y
01|241250|2|1|Estimated lead time is 3~5 days after design approval.|Y
01|241263|1|1|**cannot be cancelled or returned**|Y
01|241263|2|1|LN to thread blank drawscrew after receipt of spindle|Y
01|241263|2|2|specs|Y
01|241263|2|3|**NET PRICE**|Y
01|241271|1|1|Drawing WK-D-BT40-PG11-E|Y
01|241271|1|2|Price for one piece either Cat40 or BT40|Y
01|241271|2|1|Drawing WK-D-BT40-PG11-E|Y
01|241271|2|2|Minimum quantity order of 2 pcs.|Y
01|241271|3|1|Milling Disc 164413|Y
01|241278|1|1|Estimated delivery is mid/end December.|Y
01|241282|1|1|RGA#TOR-6240/|Y
01|241282|1|2|Repair of C40R5-0562-2.84|Y
01|241292|1|1|Quoted at NET Price for 1 presetter.|Y
01|241292|2|1|Quoted at NET Price|Y
01|241292|3|1|No Charge|Y
01|241292|6|1|Quoted at NET Price for 3 presetters.|Y
01|241292|7|1|Quoted at NET Price|Y
01|241292|8|1|No Charge|Y
01|241297|1|1|RGA#LVR-62434/|Y
01|241297|1|2|Repair of MZQT47-ER32Z-MS SN:5158203 (Mim#124638)|Y
01|241297|2|1|Replace all bearings seals and o-rings|Y
01|241297|2|2|Replace input spindle|Y
01|241298|1|1|SK40-SF12-80|Y
01|241298|2|1|SK50-0875-3.86|Y
01|241301|1|1|SN#xxxx CNC501TFAxxxx RGA#TAR-xxxxx Nidec OKK USA|Y
01|241301|1|2|OKK HPM40 SN xxxxxxxxxxx|Y
01|241301|1|3|Total Net price of overhaul for the captioned RT|Y
01|241305|1|1|IMTS special price|Y
01|241310|1|1|2 Year Warranty|Y
01|241310|5|1|A tariff surcharge of 8% will be added to every order|Y
01|241310|5|2|placed after September 1st 2025(until further notice).|Y
01|241310|5|3|This surcharge will be acknowledged upon acceptance|Y
01|241310|5|4|of every order.|Y
01|241332|2|1|Duplicate of SN15614|Y
01|241332|4|1|Duplicate of SN4077|Y
01|241332|6|1|Duplicate of SN7165|Y
01|241336|2|1|Duplicate of SN15614|Y
01|241339|1|1|Serinex: External threaded exagonal Nut for|Y
01|241339|1|2|HSK63A AngleHead ER20.  See email Serinex# NUT.20.A.EX|Y
01|241353|2|1|Spindle wrench|Y
01|241353|3|1|Nut wrench|Y
01|241354|1|1|RGA#LVR-62477/|Y
01|241354|1|2|Repair of MNL12-SK20Z-ICE-10K S/N:18900810 08|Y
01|241354|1|3|Mimatic#184650|Y
01|241354|2|1|Bearings seals and o-rings to be replaced|Y
01|241354|3|1|RGA#LVR-62477/|Y
01|241354|3|2|Repair of MNL12-SK20Z-MS-10K S/N:98096 10|Y
01|241354|3|3|Mimatic#192354|Y
01|241354|4|1|Bearings seals and o-rings to be replaced|Y
01|241356|1|1|On-Site RT Inspection Package Midwest (at YNA)|Y
01|241356|1|2|Travel (from/to IL)|Y
01|241356|1|3|Labor/Exp for 2 days work with 2 heads|Y
01|241356|1|4|RT inspection on Horkos 42 machines & preparing report|Y
01|241356|1|5|Extra fee: Anything goes beyond above-mentioned|Y
01|241356|1|6|time period and tasks will be additionally charged|Y
01|241356|1|7|......................................................|Y
01|241356|1|8|Subject RTs: CNC302FA/CNC401TFA/CNC501TFA|Y
01|241356|1|10|Requested service date: Dec/25 - Jan/1.|Y
01|241397|1|1|**Cannot be cancelled or returned after invoicing*|Y
01|241397|8|1|**Cannot be cancelled or returned after invoicing**|Y
01|241404|1|1|H10ARAM-ER32-190IC-80TP|N
01|241414|1|1|RGA#LVR-62477/|Y
01|241414|1|2|Repair of MNL12-SK20Z-ICE-10K S/N:18900810 08|Y
01|241414|1|3|Mimatic#184650|Y
01|241414|2|1|Bearings seals and o-rings to be replaced|Y
01|241414|3|1|RGA#LVR-62477/|Y
01|241414|3|2|Repair of MNL12-SK20Z-MS-10K S/N:98096 10|Y
01|241414|3|3|Mimatic#192354|Y
01|241414|4|1|Bearings seals and o-rings to be replaced|Y
01|241416|1|1|Duplicate of SN4077|Y
01|241416|3|1|Duplicate of SN7165|Y
01|241416|4|1|Duplicate of SN7165|Y
01|241432|1|1|SN:XXXX EU:CNC Engineering|Y
01|241432|1|2|MC:XXXX Model:CNCZ100|Y
01|241432|3|1|A tariff surcharge may be added to this quotation in|Y
01|241432|3|2|the event of a sustained tariff increase on the|Y
01|241432|3|3|importation of this product.  Any surcharge will be|Y
01|241432|3|4|disclosed prior to acceptance of an order.|Y
01|241433|3|1|HSK63A-SK20-90#|Y
01|241433|4|1|HSK63A-SK20-90P#|Y
01|241433|5|1|HSK63A-SK20C-120#|Y
01|241433|6|1|HSK63A-SK20C-135#|Y
01|241433|7|1|HSK63A-SK20C-200#|Y
01|241449|19|1|Estimated lead time is mid/end January.|Y
01|241453|1|1|RGA#QUA-62356/|Y
01|241453|1|2|Repair of MSL12-CT40 S/N:A0163  (Alps#T32332)|Y
01|241453|2|1|Fixing the cover and spindle and replacing all|Y
01|241453|2|2|bearings seals and o-rings|Y
01|241466|3|1|Includes 16C nose and air tube.|Y
01|241479|1|1|SK40-SF12-80|Y
01|241479|2|1|SK50-0875-3.11|Y
01|241479|2|2|SK50Tension/Compression Tap Holder #2|Y
01|241485|1|1|Estimated delivery is end of December/early January|Y
01|241485|1|2|after receipt of a Purchase Order.|Y
01|241485|2|1|Estimated lead time is early/mid January after receipt|Y
01|241485|2|2|of a Purchase Order.|Y
01|241500|2|1|Modification to existing stock according to customer|Y
01|241500|2|2|spec at 1/2 length|Y
01|241506|10|1|Misc hoses and fittings included|Y
01|241531|2|1|SN:14450 unrepairable due to damage to the spindle body|Y
01|241531|2|2|Price includes $2500.00 core deposit credit.|Y
01|241531|6|1|SN#14450 found to be in good working order.|Y
01|241531|6|2|Changed oil and adjusted backlash.|Y
01|241538|8|1|Estimated lead time will be 16~18 weeks after receipt|Y
01|241538|8|2|of an order.|Y
01|241538|9|1|This is being offered in place of the OKEX-BG15Z as|Y
01|241538|9|2|you can run this tool with internal or external coolant|Y
01|241538|9|3|or run dry.  We currently have good stock in Illinois.|Y
01|241548|1|1|shipping: 3-4 business days|Y
01|241549|1|1|RGA#LVR-62444/|Y
01|241549|1|2|Repair of T32336 (Alps#T32336)|Y
01|241549|2|1|Spindle drive shaft gears cover bearings O-rings|Y
01|241549|2|2|collet nut and small parts to be replaced|Y
01|241552|4|1|Optional - great for avoiding overheating.|Y
01|241582|2|1|Additional 20% discount has been applied for our|Y
01|241582|2|2|Overstock Promotion.  Once a Purchase Order has been|Y
01|241582|2|3|received this item cannot be cancelled or returned.|Y
01|241582|5|1|Additional 20% discount has been applied for our|Y
01|241582|5|2|Overstock Promotion.  Once a Purchase Order has been|Y
01|241582|5|3|received this item cannot be cancelled or returned.|Y
01|241584|2|1|Estimated lead time is end of January/early February.|Y
01|241590|1|1|C4.DVR.OK60A.DY SAB OD Double Y Holder|Y
01|241590|1|2|Estimated lead time is 10~12 weeks after receipt of an|Y
01|241590|1|3|order.|Y
01|241590|2|1|C4.DVR.OK60A.D SAB OD Double Holder|Y
01|241590|2|2|Estimated lead time is 10~12 weeks after receipt of an|Y
01|241590|2|3|order.|Y
01|241590|3|1|C4.DUR.OK60A.D SAB ID Double Holder|Y
01|241590|3|2|Estimated lead time is 10~12 weeks after receipt of an|Y
01|241590|3|3|order.|Y
01|241593|1|1|Estimated lead time is end of February/early March.|Y
01|241601|1|1|Please Note: Special discount for closeout special.|Y
01|241605|2|1|Currently one (1) in stock in Illinois.  Estimated|Y
01|241605|2|2|lead time of the balance is end of January/mid|Y
01|241605|2|3|February.|Y
01|241607|2|1|Estimated lead time is mid-December.|Y
01|241616|1|1|Estimated delivery is approximately 7~9 weeks after|Y
01|241616|1|2|receipt of an order.|Y
01|241616|1|3|Delivery excluding week of 12/24-1/1/26|Y
01|241616|2|1|Estimated delivery is approximately 7~9 weeks after|Y
01|241616|2|2|receipt of an order.|Y
01|241616|2|3|Delivery excluding week of 12/24-1/1/26|Y
01|241618|5|1|Item # PS-B61 is no longer in use.  Please use the|Y
01|241618|5|2|PS-B61-EU with further requests.  Drawings attached for|Y
01|241618|5|3|review.|Y
01|241622|4|1|Estimated lead time is end of February/early March.|Y
01|241627|1|1|HSK40A ER20 collet chuck with 3.94 gage length.|Y
01|241627|1|2|These are considered specials and have been quoted at|Y
01|241627|1|3|special net price. These cannot be cancelled or|Y
01|241627|1|4|returned upon PO/order. Please allow 12 weeks for|Y
01|241627|1|5|manufacturing and delivery time after signed approval|Y
01|241627|1|6|drawing.|Y
01|241629|1|1|CAT40 shell mill 16mm / 100mm GL with coolant ports.|Y
01|241635|1|1|1 currently in stock...please allow 13-14 weeks for|Y
01|241635|1|2|manufacturing and delivery time. These are considered|Y
01|241635|1|3|specials and have been quoted at special net price.|Y
01|241635|1|4|Upon PO/order issued these cannot be cancelled or|Y
01|241635|1|5|returned.|Y
01|241635|3|1|E16-EXT-750 / ER16 extension with modified length....|Y
01|241635|3|2|These are considered specials and have been quoted at|Y
01|241635|3|3|special net price. Upon PO/order issued these cannot|Y
01|241635|3|4|be cancelled or returned.|Y
01|241640|1|1|DELIVERY: 5pcs STOCK 5pcs ~10 Wks Balance ~16 Wks|Y
01|241640|2|1|DELIVERY: 5pcs STOCK 5pcs ~10 Wks Balance ~16 Wks|Y
01|241645|1|1|Please make sure this DIN holder is going on a Mori|Y
01|241645|1|2|Seiki machine. Discount reflects non-returnable item.|Y
01|241649|1|1|Does not include the motor|Y
01|241651|1|1|New Part # HSK63A-VC6-7#|Y
01|241651|1|2|Please advise if customer need the chip hole in the|Y
01|241651|1|3|holder.|Y
01|241664|2|1|This is the High Speed nut that would go on the|Y
01|241664|2|2|above high speed holder.|Y
01|241677|1|1|Please allow 14 weeks for manufacturing and delivery.|Y
01|241677|1|2|These are non-standard stock and considered specials.|Y
01|241677|1|3|Once PO/order issued these cannot be cancelled or|Y
01|241677|1|4|exchanged.|Y
01|241698|3|1|SCALE FOR TILT AXIS|Y
01|241698|4|1|EXTERNAL CABLE SET FOR TWO ADDITIONAL AXIS|Y
01|241698|6|1|4 + 1 INSTALLATION. INCLUDES INTERNAL CABLE BULKHEAD|Y
01|241698|6|2|CONNECTORS FIBRE OPTIC CABLES DUAL ADDITIONAL DRIVES|Y
01|241698|6|3|SERVO MOTORS AND WIRE HARNESS. LABOR TRAVEL TRAINING|Y
01|241698|7|1|CUSTOM ADAPTER PLATE FOR 5AX-201 FOR GE FIXTURE|Y
01|241698|7|2|** WILL NEED TO DISCUSS SOME FEATURES ON DRAWING ONCE|Y
01|241698|7|3|PO IS ISSUED ***|Y
01|241711|1|1|SPECIAL APPROVAL FOR BRIAN STALL/SHANE SCHIRMER|Y
01|241711|1|2|RELATIONSHIP. APPROVED BY JIMG & OSMAR|Y
01|241711|1|3|MACHINE = DN SOLUTIONS DVF-6500 S# TBD|Y
01|241711|1|4|CONTACTS = DAVE MOSHER BRIAN STALL|Y
01|241711|1|5|DELIVERY MID DECEMBER 2025|Y
01|241715|4|1|A tariff surcharge may be added to this quotation in|Y
01|241715|4|2|the event of a sustained tariff increase on the|Y
01|241715|4|3|importation of this product.  Any surcharge will be|Y
01|241715|4|4|disclosed prior to acceptance of an order.|Y
01|241722|3|1|This price is contingent upon completing all three|Y
01|241722|3|2|installations in one travel trip.|Y
01|241722|4|1|A tariff surcharge may be added to this quotation in|Y
01|241722|4|2|the event of a sustained tariff increase on the|Y
01|241722|4|3|importation of this product.  Any surcharge will be|Y
01|241722|4|4|disclosed prior to acceptance of an order.|Y
01|241723|3|1|Quoted at NET price.|Y
01|241727|1|1|S#1023386  1st Batch|N
01|241727|2|1|1st Batch/DWG FW'd to TR & saved in Teams File.|N
01|241746|1|1|Presetter: E46CXT3|Y
01|241746|1|2|(delivery time is excluding week of 12/24-1/1/26)|Y
01|241751|5|1|optional item|Y
01|241752|5|1|optional item|Y
01|241761|7|1|Currently stock at the factory.  If a Purchase Order is|Y
01|241761|7|2|received by early December estimated delivery is end|Y
01|241761|7|3|of December/early January.|Y
01|241769|4|1|Lead time of 1 week to be designed+manufactured upon|Y
01|241769|4|2|receipt of customer's spindle drawing after PO has been|Y
01|241769|4|3|placed.|Y
01|241771|1|1|RGA#TOR-62331/|Y
01|241771|1|2|Repair of NMTB40-NPU13-86|Y
01|241772|1|1|Special - non-cancellable non-returnable item|Y
01|241772|1|2|**Quoted at NET Price**|Y
01|241801|2|1|P/N: MZST68-C4X-ICE-10K|Y
01|241802|5|1|Final Part# SKJ16-7.2C **NET Price**|Y
01|241802|5|2|Special MOQ 5pcs - Cannot be cancelled or returned|Y
01|241802|6|1|Final Part# SKJ16-7.5C|Y
01|241802|6|2|Special non-standard stock: cannot be cancelled or|Y
01|241802|6|3|returned|Y
01|241802|11|1|Special - cannot be cancelled or returned|Y
01|241802|15|1|Special - cannot be cancelled or returned|Y
01|241811|5|1|Part number to be HSK40A-TESTBAR-200 - HSK40A test bar|Y
01|241811|5|2|dia. 25mm (0.98) GL 200mm (7.87) w/ case. This is|Y
01|241811|5|3|considered special and has been quoted at special net|Y
01|241811|5|4|price. Once PO/order issued these cannot be cancelled|Y
01|241811|5|5|or returned.|Y
01|241820|1|1|Estimated lead time is 3~4 weeks after receipt of an|Y
01|241820|1|2|order.|Y
01|241820|2|1|Estimated lead time is 3~4 weeks after receipt of an|Y
01|241820|2|2|order.|Y
01|241821|2|1|Positioning block to be manufactured by LN after|Y
01|241821|2|2|receipt of Spindle Drawing. Estimate 1 week lead time.|Y
01|241842|2|1|(25) Stk Jpn ETA 1-2wks (15) Mfg 2.5mths + 1-2wks ship|Y
01|241842|3|1|P/N: IT40-SK16-120|Y
01|241842|4|1|P/N: IT40-SK16-150|Y
01|241842|5|1|P/N: IT40-SK10-120|Y
01|241842|6|1|P/N: IT40-SK10-150|Y
01|241842|7|1|P/N: IT40-NPU8-155|Y
01|241843|1|1|P/N: IT40-C20-105|Y
01|241843|4|1|P/N: CCK20-1/8|Y
01|241843|6|1|P/N: CCK20-3/8|Y
01|241843|8|1|P/N: CCK20-5/8|Y
01|241843|9|1|P/N: CCK25-3/4|Y
01|241879|1|1|BT30-SK13-75-J|Y
01|241879|12|1|BT30-SK16-90-J|Y
01|241882|3|1|Closest Alternative Replacement for Old Mount|Y
01|241954|1|1|Quoted at NET price.|Y
01|241954|2|1|Quoted at NET price.|Y
01|241957|2|1|For 13mm and 14mm Range Metric: 12.701~14.281 mm|Y
01|241957|5|1|For 25.13-24.87mm Range Metric: 24.608~26.187 mm|Y
01|241957|6|1|Range Metric: 27.783~29.362mm|Y
01|241957|9|1|For 18mm Range Metric: 18.258~19.837mm|Y
01|241957|10|1|For 23mm Range Metric: 21.433~23.012mm|Y
01|241957|11|1|For 28mm Range Metric: 27.783~29.362 mm|Y
01|241957|12|1|For 34mm Range Metric: 34.133~35.712mm|Y
01|241960|2|1|NET Charge for Lyndex-Nikken to thread draw nut.|Y
01|241960|2|2|Customer must supply dimensions per worksheet from|Y
01|241960|2|3|Lyndex-Nikken.|Y
01|241961|2|1|Additional 20% discount has been applied for our|Y
01|241961|2|2|Overstock Promotion.  Once a Purchase Order has been|Y
01|241961|2|3|received this item cannot be cancelled or returned.|Y
01|241976|1|1|Estimated lead time is 16~18 weeks after receipt of an|Y
01|241976|1|2|order.|Y
01|241982|1|1|IT40-C20-105|Y
01|241982|7|1|CCk20-1/8|Y
01|241982|11|1|CCK20-5/8|Y
01|241982|12|1|CCK25-3/4|Y
01|241983|1|1|HSK100A-1250-3.21 HSK100A End Mill Holder 1.1/4|Y
01|241983|1|2|X 3.21 Gage Length Coolant Thru w/Chip Hole.|Y
01|241983|1|3|Per Customer Drawing|Y
01|241989|1|1|ALHQ2512-0003 0001|Y
01|241993|6|1|*gage length 6.29|Y
01|242000|1|1|Custom 5C 5/8 ID bore collet that allows a .635 pin|Y
01|242000|1|2|to fit through in the relaxed condition...see email|Y
01|242000|1|3|thread from adept@dutton-lainson.com & Tim to territory|Y
01|242005|32|1|Spindle wrench for OKL3-ER32Z|Y
01|242005|33|1|Spindle wrench for OKL3-ER32X|Y
01|242005|34|1|Nut wrench for OKL3-ER32Z & OKL3-ER32X|Y
01|242005|35|1|Spindle wrench for OKL3-ER32X-ICE & OKL3-ER32Z-ICE|Y
01|242005|36|1|Nut wrench for OKL3-ER32X-ICE & OKL3-ER32Z-ICE|Y
01|242005|37|1|Spindle wrench for OKL4-ER40X & OKL4-ER40X-C-7MP|Y
01|242005|38|1|Spindle wrench for OKL4-ER40Z & OKL4-ER40Z-C-7MP|Y
01|242005|39|1|Nut wrench for OKL4-ER40X OKL4-ER40Z OKL4-ER40X-C-7MP|Y
01|242005|39|2|& OKL4-ER40Z-C-7MP|Y
01|242016|2|1|Quoted at NET price.|Y
01|242033|9|1|Also uses the Spindle Wrench Item # WRENCH-MIM-107446|Y
01|242049|1|1|1st batch  (1)1016696 8/12 approvedMFG11/30UPD11/5>>12|N
01|242049|2|1|1st Batch/for stock   7/18 DWG approvedMFG11/07UPD11/5|N
01|242051|1|1|This item is special non-standard stock.  Once a|N
01|242051|1|2|Purchase Order has been received this item cannot be|N
01|242051|1|3|cancelled or returned.|N
01|242051|2|1|This item is special non-standard stock.  Once a|Y
01|242051|2|2|Purchase Order has been received this item cannot be|Y
01|242051|2|3|cancelled or returned.|Y
01|242080|1|1|Calibration for E346N|Y
01|242086|1|1|Special one time demo table price|Y
01|242086|1|2|Table was used for open house and trade shows|Y
01|242086|2|1|CORE MOTOR AND ELECTRICAL EXCHANGE FROM CURRENT|Y
01|242086|2|2|REPAIR. SN: 6980 / TAR-62507|Y
01|242086|2|3|REPAIR QUOTE #242044|Y
01|242086|3|1|MOTORS AND ELECTRICAL TO BE REUSED ON REPLACEMENT TABLE|Y
01|242086|3|2|REMAINDER OF PARTS TO BE DESTROYED WITH YOUR TRADE IN|Y
01|242097|1|1|One time special price for show table.|Y
01|242101|7|1|Quoted at NET price.|Y
01|242130|1|1|GC000648|Y
01|242130|2|1|GC000649|Y
01|242130|3|1|GC000650|Y
01|242130|4|1|GC000651|Y
01|242133|1|1|**Wrenches Included**|Y
01|242133|2|1|**Wrenches Included**|Y
01|242134|1|1|SKB.40.70.ER32|Y
01|242134|2|1|SKB.40.100.ER32|Y
01|242134|3|1|SKB.40.120.ER32|Y
01|242134|4|1|SKB.40.130.ER32|Y
01|242134|5|1|SKB.40.160.ER32|Y
01|242134|6|1|SKB.40.200.ER32|Y
01|242141|1|1|CMX1100 special pricing with installation|Y
01|242145|3|1|*LN to design positioning block upon recept of spindle|Y
01|242145|3|2|drawing information.|Y
01|242148|1|1|Standard one (1) year warranty honored from date of|Y
01|242148|1|2|delivery.|Y
01|242151|1|1|Includes power and feedback cables from Nikken Table|Y
01|242151|1|2|to the Machine Bulkhead|Y
01|242172|1|1|Discontinued - Non-cancellable Non-returnable|Y
01|242172|2|1|Discontinued - Non-cancellable Non-returnable|Y
01|242177|1|1|RGA#62311/|Y
01|242177|1|2|Repair of 1 pc of H63ARAM-SL12-280STEC-64TP s/n:|Y
01|242177|1|3|This tool will be manufactured strictly in accordance|Y
01|242177|1|4|with the customer's request to modify Right Angle|Y
01|242177|1|5|Mimatic products.  Lyndex-Nikken and Mimatic were not|Y
01|242177|1|6|involved in the decision to alter the original tool|Y
01|242177|1|7|design and as such so not guarantee the performance|Y
01|242177|1|8|suitability or reliabilityof this modified tool in|Y
01|242177|1|9|the intended application.  Any rsiks associated with|Y
01|242177|1|10|the use of this tool is assumed solely by the customer|Y
01|242177|2|1|Bearings seals weldon spindle with new ER20 design|Y
01|242177|2|2|to be replaced.  Also tool was crashed housing and|Y
01|242177|2|3|cover plate need to be replaced on S/N:24903435 02|Y
01|242181|1|1|CAT40-MMC12C-150U-AA-IDU|Y
01|242186|1|1|SN:1864 EU:Haygor Instrument & Co|Y
01|242186|1|2|RGA#TAR-62345 5AX-130YA|Y
01|242186|1|3|Repair declined. Returning disassembled.|Y
01|242189|1|1|Req.INS/Install E20-NUT|Y
01|242189|2|1|1st Batch/1019363 MfgSol/R&E Leverage 10/3/25:DWG APRVD|Y
01|242189|3|1|1st Batch/1019363 MfgSol/R&E Leverage 10/3/25:DWG APRVD|Y
01|242189|4|1|1st Batch/1019363 MfgSol/R&E Leverage 10/3/25:DWG APRVD|Y
01|242189|5|1|1st Batch/Install E11-NUT-MINI/E11-SCREW(C) S#1022064|Y
01|242189|5|2|10/20:DWG APRVD|Y
01|242215|1|1|Part #MNZ20-ER32Z-ICE|Y
01|242215|1|2|Mori BMT40 Live ER32 Z<Axial>90D With ICE|Y
01|242218|1|1|Discontinued Item - non-cancellable non-returnable|Y
01|242221|1|1|RGA#LVR-62490/|Y
01|242221|1|2|Repair of MZMP46-ER32X-OFF-ICE S/N:2190142103|Y
01|242221|1|3|Mimatic#124252|Y
01|242221|2|1|Bearings  seals and o-rings to be replaced|Y
01|242221|3|1|RGA#LVR-62490/|Y
01|242221|3|2|Repair of MZMP46-ER32X-OFF-ICE S/N:2190142104|Y
01|242221|3|3|Mimatic#124252|Y
01|242221|4|1|Bearings  seals and o-rings to be replaced.|Y
01|242221|4|2|Input spindle also to be replaced.|Y
01|242222|1|1|Part #MNZ20-ER32Z-ICE|Y
01|242222|1|2|Mori BMT40 Live ER32 Z<Axial>90D With ICE|Y
01|242227|1|1|Discontinued Item - cannot be cancelled or returned|Y
01|242227|2|1|Additional 20% Overstock discount|Y
01|242240|1|1|Delivery: 1-pc ETA to L-N end of Dec 2-pcs ETA Beg Feb|Y
01|242240|2|1|Please Note: This item is Special once a purchase|Y
01|242240|2|2|order is placed it cannot be cancelled of returned.|Y
01|242240|2|3|Textron approved the drawing for this item in 2020.|Y
01|242247|1|1|1st batch(w/IDU)|Y
01|242251|3|1|HSK63A-SK13-70#   HSK63A Slim Chuck SK13 Coolant 20K|Y
01|242251|4|1|HSK63A-SK13-105#  HSK63A Slim Chuck SK13 Coolant 20K|Y
01|242251|7|1|HSK63A-SK20-90#   HSK63A Slim Chuck SK20 20K|Y
01|242259|1|1|No Inspection Required.|Y
01|242259|2|1|No Inspection Required.|Y
01|242259|3|1|No Inspection Required.|Y
01|242260|1|1|**Net Price**|Y
01|242260|2|1|**Net Price**|Y
01|242264|1|1|SN:3086 EU:FBT Inc.|Y
01|242264|1|2|RGA#TAR-62471 CNC200FA|Y
01|242266|1|1|Weight 36lbs.|Y
01|242266|1|2|Max tool shank dia. 1|Y
01|242281|1|1|Gage length is 3.50|Y
01|242281|3|1|Extra 20% added to the discount for above toolholder|Y
01|242281|3|2|Please not these are not returnable.|Y
01|242284|1|1|RPLC for SZM BOAT#252972 shortage|Y
01|242284|1|2|PW>WH1|N
01|242284|2|1|RPLC for NCR#496-1|Y
01|242284|2|2|DT>WH1|Y
01|242407|2|1|Additional 20% discount has been applied for our|Y
01|242407|2|2|Overstock Promotion.  Once a Purchase Order has been|Y
01|242407|2|3|received this item cannot be cancelled or returned.|Y
01|242413|2|1|H10ARAM-ER32-190-110TP with internal Coolant|Y
01|242427|1|1|S.RCC-E-70|Y
01|242427|2|1|S.RCC-E-53|Y
01|242427|3|1|S.RCC-E-43|Y
01|242427|4|1|S.RCC-K-53|Y
01|242427|5|1|S.RCC-K-70|Y
01|242431|4|1|BT30-C16-55G|Y
01|242465|1|1|SK40-ER32-70|Y
01|242465|1|2|SK0 TAPER - ER32 - 70MM GL|Y
01|242465|1|3|1-9 PCS = $106 PER HOLDER|Y
01|242465|1|4|10-20 PCS - $96 PER HOLDER|Y
01|242465|1|5|21+ PCS = $88 PER HOLDER|Y
01|242465|2|1|SK40-ER32-100|Y
01|242465|2|2|SK40 TAPER - ER32 - 100MM GL|Y
01|242465|2|3|1-9 PCS = $116 PER HOLDER|Y
01|242465|2|4|10-20 PCS = $105 PER HOLDER|Y
01|242465|2|5|21+ PCS = $97 PER HOLDER|Y
01|242465|3|1|SK40-ER32-130|Y
01|242465|3|2|SK40 TAPER - ER32 - 130MM GL|Y
01|242465|3|3|1-9 PCS = $172 PER HOLDER|Y
01|242465|3|4|10-20 PCS = $156 PER HOLDER|Y
01|242465|3|5|21+ PCS = $143 PER HOLDER|Y
01|242465|4|1|SK40-ER32-160|Y
01|242465|4|2|SK40 TAPER - ER32 - 160MM GL|Y
01|242465|4|3|1-9 PCS  = $222 PER HOLDER|Y
01|242465|4|4|10-20 PCS = $202 PER HOLDER|Y
01|242465|4|5|21+ PCS = $185 PER HOLDER|Y
01|242470|7|1|Part#: TBD|Y
01|242470|7|2|C4006-0625-3.00 modified for 3.75 bore depth instead|Y
01|242470|7|3|of 3.5|Y
01|242470|7|4|*Special considered non-cancellable+non-returnable.|Y
01|242471|1|1|EXTERNAL COOLANT ONLY|Y
01|242471|2|1|INTERNAL OR EXTERNAL COOLANT|Y
01|242483|6|1|Net pricing for a special ordered item.|Y
01|242483|6|2|Cannot be cancled or returned.|Y
01|242490|1|1|This item is special non-standard stock.  Once a|Y
01|242490|1|2|Purchase Order is received this item cannot be|Y
01|242490|1|3|cancelled or returned.|Y
01|242490|3|1|This item is special non-standard stock.  Once a|Y
01|242490|3|2|Purchase Order is received this item cannot be|Y
01|242490|3|3|cancelled or returned.|Y
01|242508|7|1|Straight Shank Extension|Y
01|242508|7|2|Shrink Fit|Y
01|242511|1|1|This table includes the motor and faceplate.|Y
01|242511|2|1|Customer responsible for machine having correct ladder|Y
01|242511|2|2|and any other options needed for 4th axis integration.|Y
01|242513|1|1|PLEASE NOTE:  Additional 2% Customer Zone discount|Y
01|242513|1|2|added due to website issues.|Y
01|242521|1|1|**NET Price** Special - cannot be cancelled or returned|Y
01|242521|1|2|upon receipt of PO|Y
01|242521|1|3|**Minimum Order Quantity 2 pcs**|Y
01|242525|1|1|Special non-standard stock - cannot be cancelled or|Y
01|242525|1|2|returned|Y
01|242527|1|1|This item is special non-standard stock.  Once a|Y
01|242527|1|2|Purchase Order has been received this item cannot be|Y
01|242527|1|3|cancelled or returned.|Y
01|242552|2|1|This holder is Overstock and I added extra 20% to the|Y
01|242552|2|2|discount. Item is non-returnable.|Y
01|242556|1|1|Estimated lead time is 16~18 weeks after receipt of an|N
01|242556|1|2|order.|N
01|242556|2|1|Estimated lead time is 16~18 weeks after receipt of an|N
01|242556|2|2|order.|N
01|242556|3|1|Estimated lead time is 16~18 weeks after receipt of an|N
01|242556|3|2|order.|N
01|242556|4|1|Estimated lead time is 16~18 weeks after receipt of an|N
01|242556|4|2|order.|N
01|242556|5|1|Estimated lead time is 16~18 weeks after receipt of an|N
01|242556|5|2|order.|N
01|242557|2|1|INCREMENTAL ANGLE ENCODER WITH INTEGRAL BEARING|Y
01|242557|2|2|AND INTEGRATED STATOR COUPLING|Y
01|242560|1|1|Currently one (1) in stock.|Y
01|242560|2|1|Estimated lead time is 16~18 weeks after receipt of an|Y
01|242560|2|2|order.|Y
01|242560|3|1|Estimated lead time is 16~18 weeks after receipt of an|Y
01|242560|3|2|an order.|Y
01|242560|4|1|Currently one (1) in stock.|Y
01|242560|5|1|Estimated lead time is 16~18 weeks after receipt of an|Y
01|242560|5|2|order.|Y
01|242561|1|1|Estimated lead time is 16~18 weeks after receipt of an|Y
01|242561|1|2|order.|Y
01|242561|2|1|Estimated lead time is 16~18 weeks after receipt of an|Y
01|242561|2|2|order.|Y
01|242561|3|1|Estimated lead time is 16~18 weeks after receipt of an|Y
01|242561|3|2|order.|Y
01|242561|4|1|Currently one (1) in stock.|Y
01|242561|5|1|Estimated lead time is 16~18 weeks after receipt of an|Y
01|242561|5|2|order.|Y
01|242565|2|1|Estimated lead time is 2~3 Weeks after receipt of an|Y
01|242565|2|2|order.  Please keep in mind the factory is closed from|Y
01|242565|2|3|12/29/2025 to 1/4/2026.|Y
01|242570|1|1|Please Note: This holder is NOT supplied with Makino|Y
01|242570|1|2|Pins. If customer needs them please advise before|Y
01|242570|1|3|placing order.|Y
01|242572|1|1|NOTE: Without Motor(x2)  SN: 4023|Y
01|242590|1|1|Final Part# TBD **NET PRICE** MOQ 2 PCS|Y
01|242590|1|2|SPECIAL 560-001S - 5C Emergency Collet Steel with|Y
01|242590|1|3|50-55 HRC.|Y
01|242590|1|4|.|Y
01|242590|1|5|DELIVERY: Please allow 1-2 Wks design time plus 8-10|Y
01|242590|1|6|Wks for MFG/Shipping after approval drawing is signed|Y
01|242590|1|7|by the customer.|Y
01|242622|1|1|**NET Price**|Y
01|242622|2|1|**NET Price**|Y
01|242622|3|1|**NET Price**|Y
01|242622|4|1|**NET Price**|Y
01|242622|5|1|**NET Price**|Y
01|242627|1|1|Discontinued - cannot be cancelled or returned|Y
01|242665|1|1|1st batch/for stock  9/18 approved|N
01|242673|1|1|1st batch/RPLC GL195|Y
01|242686|1|1|NCAT50 Test Bar >> NCAT50-TB2.1/2-14.00NF|Y
01|242686|1|2|DUAL CONTACT CAT50 2.1/2x 14 No Flange w/ Wooden Case|Y
01|242686|2|1|NCAT40 Test Bar >> NCAT40-TB1.3/4-14.00NF|Y
01|242686|2|2|DUAL CONTACT CAT40 1.3/4x 14 No Flange w/ Wooden Case|Y
01|242700|1|1|**NET PRICE**|Y
01|242700|1|2|QTY BREAK NET PRICING:|Y
01|242700|1|3|1 pc: $27478.00|Y
01|242700|1|4|2 pcs: $17737.00|Y
01|242700|2|1|LN to make block after receipt of spinlde specs|Y
01|242700|2|2|necessary for design.|Y
01|242705|1|1|same as serial#27071TC (CNCZ202FA)|Y
01|242705|1|2|without motor|Y
01|242712|1|1|part# TBD|Y
01|242712|1|2|Ref. Drawing# 198316|Y
01|242712|1|3|BMT85 90-Degree Live Tool Capto5 Output|Y
01|242712|2|1|part# TBD|Y
01|242712|2|2|Ref. Drawing# 198315|Y
01|242712|2|3|BMT85 Straight Live Tool Capto5 Output|Y
01|242734|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|242759|1|1|Quoted at NET price.|Y
01|242773|10|1|1.5D  INSTALLATION & TRAINING. ALL TRAVEL AND HOTEL|Y
01|242773|10|2|INCLUDED IN COST|Y
01|242776|2|1|Estimated delivery is 14~16 weeks after receipt of an|Y
01|242776|2|2|order.|Y
01|242789|1|1|RGA#CUR-62535/|Y
01|242789|1|2|Repair of B40-MRAM-IC SN:2290428601 (Mim#162815)|Y
01|242789|2|1|Replace All Bearings Seals and O-Rings|Y
01|242789|4|1|RGA#CUR-62535/|Y
01|242789|4|2|Repair of MRAM-MI40L SN:2590047101 Mim#178048|Y
01|242789|5|1|Replace All Bearings Seals and O-Rings|Y
01|242789|7|1|RGA#CUR-62535/|Y
01|242789|7|2|Repair of PA65-CAT/BT SN:2190485204 Mim#162741|Y
01|242789|8|1|Replace O-rings & Spring Clean & Reassemble|Y
01|242817|1|1|BT30ND-SK10-45P|Y
01|242817|1|2|Without drive key|Y
01|242817|1|3|Precio unitario en la compra de 1-9 piezas.|Y
01|242817|2|1|BT30ND-SK10-45P|Y
01|242817|2|2|Without drive key|Y
01|242817|2|3|Precio unitario en la compra de 10-19 piezas.|Y
01|242817|3|1|BT30ND-SK10-45P|Y
01|242817|3|2|Without drive key|Y
01|242817|3|3|Precio unitario en la compra de 20-29 piezas.|Y
01|242822|1|1|No Inspection Required.|Y
01|242822|2|1|No Inspection Required.|Y
01|242831|1|1|Estimated delivery is end of January beginning of|Y
01|242831|1|2|February.|Y
01|242836|1|1|INSPECTION OF ROTARY TABLES ON YEARLY BASIS|Y
01|242836|1|2|ESTIMATE OF QUOTE IS FOR 4 HOURS OF LABOR TO CHECK|Y
01|242837|1|1|**NET PRICE**|Y
01|242837|1|2|QTY BREAK NET PRICING:|Y
01|242837|1|3|1 pc: $27478.00|Y
01|242837|1|4|2 pcs: $17737.00|Y
01|242837|2|1|LN to make block after receipt of spinlde specs|Y
01|242837|2|2|necessary for design.|Y
01|242840|1|1|1.1/2 Straight Shank EXT TG150 Chuck|Y
01|242845|1|1|We currently have two (2) in stock with the balance of|Y
01|242845|1|2|one (1) due in mid/end of January.|Y
01|242845|2|1|Required wrenches (x2).|Y
01|242859|1|1|Special price end of year promo|Y
01|242860|2|1|Estimated lead time is 4~6 days after design|Y
01|242860|2|2|approval.|Y
01|242862|1|1|NP-120 Base Plate for Mazak C-600 machine|Y
01|242862|2|1|WAIVE RESTOCK ON 8 PCS OF NP120 POTS SOLD ON|Y
01|242862|2|2|INVOICE #1026475 1 INDEX AND 7 STANDARDS|Y
01|242862|2|3|CREDIT VALUE AT LIST PRICE = $13549 / 10161.75NET|Y
01|242866|1|1|Custom 5C 5/8 collet that is sprung w/ certain stroke.|Y
01|242866|3|1|Custom 5C 1/2 collet that is sprung w/ certain stroke.|Y
01|242869|5|1|Please Note: This holder is special and will require|Y
01|242869|5|2|a signed approval drawing from customer. Please allow|Y
01|242869|5|3|additional time for the drawing process. Once a PO is|Y
01|242869|5|4|placed it cannot be cancelled or returned.|Y
01|242869|7|1|Please Note: This has no coolant ports.|Y
01|242870|1|1|RGA#QUA-62502/|Y
01|242870|1|2|Repair of C40RAM-ER32-180TS-65TP SN:2290412002|Y
01|242870|1|3|(Mim#178142)|Y
01|242870|2|1|Bearings seals o-rings CAT40 input spindle and ER32|Y
01|242870|2|2|spindles to be replaced.|Y
01|242884|2|1|Estimated delivery is 14~16 weeks after receipt of an|Y
01|242884|2|2|order.|Y
01|242885|1|1|SN:xxxx Model Table|Y
01|242886|1|1|This table includes the motor and faceplate.|Y
01|242886|2|1|Customer responsible for machine having correct ladder|Y
01|242886|2|2|and any other options needed for 4th axis integration.|Y
01|242894|2|1|Additional 20% discount applied for our Overstock|Y
01|242894|2|2|Promotion.  Once a Purchase Order has been received|Y
01|242894|2|3|this item cannot be cancelled or returned.|Y
01|242895|1|1|Special pricing good until 12/30/2025.|Y
01|242895|2|1|Quoted at NET price.|Y
01|242895|6|1|Standard pricing after 12/30/2025.|Y
01|242901|1|1|RGA#LVR-62523/|Y
01|242901|1|2|Repair of MNL12-ER25X-OFF-HS-ICE SN:2590035901|Y
01|242901|1|3|(Mim#189424)|Y
01|242901|2|1|Replace All Bearings Seals and O-Rings|Y
01|242910|17|1|Estimated delivery is mid/end February.|Y
01|242915|3|1|Part# NIT50-SK10C-105|Y
01|242915|3|2|Dual contact SK50 ISO50 SlimChuck SK10 105 gauge length|Y
01|242915|4|1|Part# NIT50-SK10C-135|Y
01|242915|4|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|242915|5|1|Part# NIT50-SK16C-105|Y
01|242915|5|2|Dual contact SK50 ISO50 SlimChuck SK16 105 gauge length|Y
01|242915|6|1|Part# NIT50-SK16C-135|Y
01|242915|6|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|242915|7|1|part# NIT50-SK16C-165|Y
01|242915|7|2|Dual contact SK50 ISO50 SlimChuck SK16 165 gauge length|Y
01|242915|8|1|Part# NIT50-C20-165|Y
01|242915|8|2|SK50 DualContact Milling Chuck 20mm|Y
01|242915|9|1|Part# NIT50-SK20C-165|Y
01|242915|9|2|Dual contact SK50 ISO50 SlimChuck SK16 165 gauge length|Y
01|242915|10|1|Part# NIT50-SK20C-135|Y
01|242915|10|2|Dual contact SK50 ISO50 SlimChuck SK16 135 gauge length|Y
01|242915|11|1|Part# NIT50-FMH40-100-45|Y
01|242915|11|2|SK50 Dual Contact 40mm Face Mill holdedr|Y
01|242915|12|1|NIT50-C6-55|Y
01|242915|12|2|SK50 Polygonal C6 holder|Y
01|242941|1|1|Motor Rebuild / Refurbish|Y
01|242959|1|1|Quoted at NET price|Y
01|242965|1|1|INCQ2512-0794 0001|Y
01|242971|2|1|NIT50-C32-120G|Y
01|242971|2|2|Non-cancellable/non-returnable|Y
01|242971|3|1|NIT50-C32EX-115|Y
01|242971|3|2|Alternative to NIT50-C32-120G|Y
01|242971|5|1|Part# NIT50-SK10C-105|Y
01|242971|5|2|Dual contact SK50 ISO50 SlimChuck SK10 105 gauge length|Y
01|242971|6|1|Part# NIT50-SK10C-135|Y
01|242971|6|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|242971|7|1|NIT50-SK10C-165|Y
01|242971|8|1|Part# NIT50-SK16C-105|Y
01|242971|8|2|Dual contact SK50 ISO50 SlimChuck SK16 105 gauge length|Y
01|242971|9|1|Part# NIT50-SK16C-135|Y
01|242971|9|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|242971|48|1|NIT50-SK25C-135|Y
01|242971|49|1|NIT50-SK25C-165|Y
01|242972|3|1|Part# NIT50-SK10C-105|Y
01|242972|3|2|Dual contact SK50 ISO50 SlimChuck SK10 105 gauge length|Y
01|242972|4|1|Part# NIT50-SK10C-135|Y
01|242972|4|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|242972|5|1|Part# NIT50-SK16C-105|Y
01|242972|5|2|Dual contact SK50 ISO50 SlimChuck SK16 105 gauge length|Y
01|242972|6|1|Part# NIT50-SK16C-135|Y
01|242972|6|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|242972|11|1|Part# NIT50-FMH40-100-45|Y
01|242972|11|2|SK50 Dual Contact 40mm Face Mill holdedr|Y
01|242972|12|1|NIT50-C6-55|Y
01|242972|12|2|SK50 Polygonal C6 holder|Y
01|242973|3|1|Part# NIT50-SK10C-105|Y
01|242973|3|2|Dual contact SK50 ISO50 SlimChuck SK10 105 gauge length|Y
01|242973|4|1|Part# NIT50-SK10C-135|Y
01|242973|4|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|242973|5|1|Part# NIT50-SK16C-105|Y
01|242973|5|2|Dual contact SK50 ISO50 SlimChuck SK16 105 gauge length|Y
01|242973|6|1|Part# NIT50-SK16C-135|Y
01|242973|6|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|242973|11|1|Part# NIT50-FMH40-100-45|Y
01|242973|11|2|SK50 Dual Contact 40mm Face Mill holdedr|Y
01|242973|12|1|NIT50-C6-55|Y
01|242973|12|2|SK50 Polygonal C6 holder|Y
01|242978|1|1|part# TBD|Y
01|242978|1|2|HSK100A Blank Bar 3.00 Diameter x 10.14 gage length|Y
01|242978|1|3|10 pcs or greater $616 ea. NET|Y
01|242978|3|1|part# TBD|Y
01|242978|3|2|HSK100A Blank Bar 3.75 Diameter x 13.00 gage length|Y
01|242978|3|3|10 pcs. or greater $673 ea. NET|Y
01|242980|1|1|P/N: ST25M-SF10-160|Y
01|242980|1|2|0.3940 (10.0mm) ID x 6.30 x .984 OD Shrink Fit Ext|Y
01|242980|2|1|P/N: ST75-SF10-160|Y
01|242980|2|2|0.3940 (10.0mm) ID x 6.30 x .75 OD Shrink Fit Ext|Y
01|242980|3|1|P/N: ST10-SF10-160|Y
01|242980|3|2|0.3940 (10.0mm) ID x 6.30 x 1 OD Shrink fit Ext|Y
01|242982|1|1|IT40-C20-120|Y
01|242982|1|2|20MM MILLING CHUCK|Y
01|242982|2|1|IT40-MTA2-120|Y
01|242982|2|2|MORSE TAPER #2 ADAPTER|Y
01|242982|3|1|IT40-NPU13-80|Y
01|242982|3|2|1/2 KEYLESS DRILL CHUCK|Y
01|242982|4|1|IT40-C32-95|Y
01|242982|4|2|32MM MILLING CHUCK|Y
01|242982|5|1|SK40-ER32-100|Y
01|242982|5|2|ER32 HOLDER 100MM GL|Y
01|242995|1|1|Currently 5 left on the shelf.|Y
01|242995|2|1|Please note additional 20% applied per overstock promo.|Y
01|242995|2|2|Once PO/order issued these cannot be cancelled or|Y
01|242995|2|3|returned.|Y
01|242996|1|1|CNC321BFA SN 16771 Oil leak repair|Y
01|242996|1|2|Labor costs and consumable parts are included.|Y
01|242996|2|1|Inspection Fee CNC321BFA SN 16771|Y
01|242996|2|2|If you proceed with the repair or place an order for a|Y
01|242996|2|3|new RT L-N will cover this cost.|Y
01|243002|1|1|1st Batch/DWG saved in Teams File & FW'd to TimR.|N
01|243019|1|1|INCQ2512-0845 0004|Y
01|243033|1|1|Demo table used for test cuts.|Y
01|243046|1|1|for Haas VF6|Y
01|243048|1|1|1st Batch|Y
01|243052|4|1|CUSTOM CABLE MANAGMENT FOR DIRECT PALLET MOUNT|Y
01|243052|4|2|MIDACO PALLET CHANGER.|Y
01|243052|4|3|TABLE TO BE MOUNTED TO REAR PALLET. FIELD MODIFICATION|Y
01|243052|4|4|OF PALLET CHANGER DOOR FOR CABLE PASS THROUGH.|Y
01|243052|4|5|INSTALLATION LABOR INCLUDED. INSTALLATION REQUIRES|Y
01|243052|4|6|COMPLETED & FUNCTIONAL MIDACO PALLET CHANGER.|Y
01|243053|1|1|CNC321BFA-8PRJ (Ref SN 17214)|Y
01|243053|1|2|NET Price. SP Order Item. Orders cannot be canceled|Y
01|243053|1|3|after confirmation.|Y
01|243053|1|4|Lead time: 2.5mo mfg + Ship(Boat) 1.5mo|Y
01|243055|10|1|#27 NH301R027|Y
01|243055|10|2|Clamp Piece|Y
01|243057|10|1|#27 NH301R027 Clamp Piece1|Y
01|243068|1|1|Labor to convert CNC321LFA-M to CNC321LOSP4-M|Y
01|243068|1|2|Motor and booster will be used from unrepairable table|Y
01|243068|1|3|at L/N|Y
01|243070|1|1|Quoted at NET pricing|Y
01|243075|1|1|Retainer for H037M8 - 8 standard Howa chuck|Y
01|243082|1|1|Dual Contact BT30 Blank Bar|Y
01|243082|1|2|2.25 OD x 8 projection|Y
01|243128|1|1|Req.INS/OD Groove frange Dia issue|Y
01|243128|2|1|Req.INS/Install S7/16-20X3/8 S#1018391 Dye CNC|Y
01|243128|3|1|Req.INS/Install (2) S3/4-16X11/16/(1)1022223|Y
01|243133|1|1|Minimum Quantity 2-Holders|Y
01|243133|1|2|Please Note: Delivery is based upon an order of|Y
01|243133|1|3|2 holders after receipt of approval drawing. Please|Y
01|243133|1|4|allow additional time for the drawing approval process.|Y
01|243133|1|5|This holder is Special once a purchase order is|Y
01|243133|1|6|placed it cannot be cancelled or returned.|Y
01|243137|1|1|Delivery: 1 STOCK 20pcs 2weeks|Y
01|243140|1|1|Ref CNC260TFA-M-10+1 SN 13331|Y
01|243140|1|2|SP Order. NET Price. No cancellations after order.|Y
01|243140|1|3|Lead Time: 2.5mo mfg + Ship(Boat)1.5mo.|Y
01|243140|1|4|with special face plate and 10+1 R/Joint|Y
01|243146|7|1|Total 21 ER32 Collet inch size|Y
01|243157|1|1|Req.INS/Install E20-NUT|Y
01|243157|2|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|243157|3|1|1st Batch/Stock|Y
01|243157|5|1|Req.INS/Rust Issue|Y
01|243165|1|1|LIST PRICE = $24625.00|Y
01|243165|1|2|PROMOTIONAL OVERSTOCK APPLIED FOR 20% OFF|Y
01|243165|1|3|OFFER GOOD TILL 1/30/26|Y
01|243165|3|1|LIST PRICE = $24625.00|N
01|243165|3|2|PROMOTIONAL OVERSTOCK APPLIED FOR 20% OFF|N
01|243165|3|3|GOOD TILL 1/31/26|N
01|243165|4|1|TRADE IN ALLOWANCE FOR HAIMER POWER CLAMP SE|Y
01|243165|4|2|INCLUDES BROKEN CHILLER UNIT|Y
01|243165|5|1|APPLIED TO LIST PRICE OF SF-FI6-UNIT-380|Y
01|243166|1|1|SN:8030 EU:Waukesha Machine Tool|Y
01|243166|1|2|RGA#TAR-62598 CNCZ201|Y
01|243172|1|1|***NON-CANCELLABLE; NON-RETURNABLE ONCE PO PLACED|Y
01|243172|1|2|UNLESS THERE IS A MANUFACTURING DEFECT***|Y
01|243187|1|1|Special Non-standard Item - cannot be cancelled or|Y
01|243187|1|2|returned upon receipt of PO|Y
01|243193|1|1|T/P Inspection Required.|Y
01|243193|2|1|T/P Inspection Required.|Y
01|243200|1|1|For MNL12-BG12Z-MST|Y
01|243201|1|1|**NET PRICE**|Y
01|243201|1|2|2-Hole DIN modification of customer bought|Y
01|243201|1|3|CAT40-SK10-90U-IDU|Y
01|243208|1|1|NEW MACHINE STARTUP PACKAGE HAAS UMC500 CAT40|Y
01|243208|1|2|EXISTING USER OF SK SHRINK FITER|Y
01|243208|1|3|42.5% OFF|Y
01|243208|1|4|$20k OR GREATER ELIGIBLE FOR 50% OFF|Y
01|243215|5|1|Please note additional 20% applied per overstock promo.|Y
01|243215|5|2|Once PO/order issued these cannot be cancelled or|Y
01|243215|5|3|returned. Currently 14 pieces on the shelf these will|Y
01|243215|5|4|need to be requoted for price & availability upon stock|Y
01|243215|5|5|depletion.|Y
01|243221|1|1|TNKQ2512-0791 0001|Y
01|243225|1|1|SN:N/A EU:Joe Hornick Enterprises Inc.|Y
01|243225|1|2|RGA#TAR-62594 PBA-150|Y
01|243228|7|1|inspect rust/corrosion on the taper|Y
01|243230|1|1|T/P Inspection Required|N
01|243233|1|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|243233|2|1|Req.INS/Install E40-NUT & ER40-SCREW(C)|Y
01|243233|3|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|243248|1|1|SK25-17AC|Y
01|243248|1|2|SK25 Slim Chuck Collet 17mm On Size Mechanical Coolant|Y
01|243248|1|3|Seal.|Y
01|243248|1|4|QUOTED AT NET PRICING.|Y
01|243248|2|1|QUOTED AT NET PRICING|Y
01|243248|3|1|QUOTED AT NET PRICING|Y
01|243248|5|1|SK25-21AC|Y
01|243248|5|2|SK25 Slim Chuck Collet 21mm On Size Mechanical Coolant|Y
01|243248|5|3|Seal|Y
01|243248|5|4|QUOTED AT NET PRICING|Y
01|243248|6|1|SK25-22AC|Y
01|243248|6|2|SK25 Slim Chuck Collet 22mm On Size Mechanical Coolant|Y
01|243248|6|3|Seal|Y
01|243248|6|4|QUOTED AT NET PRICING|Y
01|243248|7|1|SK25-23AC|Y
01|243248|7|2|SK25 Slim Chuck Collet 23mm On Size Mechanical Coolant|Y
01|243248|7|3|Seal|Y
01|243248|7|4|QUOTED AT NET PRICING|Y
01|243248|8|1|SK25-24AC|Y
01|243248|8|2|SK25 Slim Chuck Collet 24mm On Size Mechanical Coolant|Y
01|243248|8|3|Seal|Y
01|243248|8|4|QUOTED AT NET PRICING|Y
01|243268|2|1|ESTIMATED REPAIR FOR DAMAGED HEAD = $3600-$4200|Y
01|243268|2|2|lEAD TIME APROX 6-8 WEEKS|Y
01|243273|1|1|Please Note: We will only ship 8 holders since they|Y
01|243273|1|2|have 2 that we sent for test and they will keep those.|Y
01|243290|1|1|H037M15 A8 Adapter Special Draw Screw|Y
01|243290|2|1|H037M15 Special Draw Screw|Y
01|243326|1|1|1st Batch/10/21/25: Spec Change/APRVED by JDMFG1/28UPD|N
01|243328|1|1|**Cannot be cancelled or returned after invoicing**|Y
01|243332|1|1|**Cannot be cancelled or returned after invoicing**|Y
01|243339|2|1|Additional 20% discount added for our Overstock|Y
01|243339|2|2|Promotion.  Once a Purchase Order has been received|Y
01|243339|2|3|these holders cannot be cancelled or returned.|Y
01|243348|1|1|Quoted at NET pricing|Y
01|243352|1|1|Please note these are non-standard stock and considered|Y
01|243352|1|2|special. Once PO/order issued these can't be cancelled|Y
01|243352|1|3|or returned.|Y
01|243362|1|1|RGA#CUR-62555/|Y
01|243362|1|2|Repair of C50-MRAM SN:7131701 (Mim#162732)|Y
01|243362|2|1|Replace All Bearings Seals and O-Rings|Y
01|243362|4|1|RGA#CUR-62555/|Y
01|243362|4|2|Repair of MRAM-NSK-M17 SN:2390615905 (Mim#162756)|Y
01|243362|5|1|Replace All Bearings Seals and O-Rings|Y
01|243369|13|1|Discontinued - cannot be cancelled or returned upon|Y
01|243369|13|2|receipt of PO|Y
01|243424|1|1|Currently have 25 in stock in Illinois.  Estimated|N
01|243424|1|2|lead time for the balance of five (5) is 20~22 weeks|N
01|243424|1|3|after receipt of an order.|N
01|243431|1|1|Overhaul repair: CNCZ302FA-9+1PRJ / CNC302FAHS-11+1PRJ|Y
01|243431|1|2|including replacement of consumable parts|Y
01|243431|1|3|worm wheel worm shaft-assy|Y
01|243431|3|1|Overhaul repair: CNC401TFA-11+1PRJ / CNC401TFA-9+1PRJ|Y
01|243431|3|2|including replacement of consumable parts|Y
01|243431|3|3|worm wheel worm shaft-assy|Y
01|243443|1|1|SN:xxxxxx xxxxxx EU:PHB Machining Inc|Y
01|243443|1|2|MC:Brother Model:R650XD1 40T|Y
01|243457|1|1|Estimated lead time is 22-24 weeks after receipt of an|Y
01|243457|1|2|order.|Y
01|243461|1|1|Please note this is non-standard stock and considered|Y
01|243461|1|2|special. Once PO/order issued these can't be cancelled|Y
01|243461|1|3|or returned. Wrench that goes with holder listed below.|Y
01|243461|4|1|Please note this is non-standard stock and considered|Y
01|243461|4|2|special. Once PO/order issued these can't be cancelled|Y
01|243461|4|3|or returned. Wrench that goes with holder listed below.|Y
01|243465|1|1|Currently have 24 in stock estimated lead time for|N
01|243465|1|2|balance of one (1) is 2~3 weeks after receipt of an|N
01|243465|1|3|order.|N
01|243466|1|1|CNC260Z260LFA SN 7033|Y
01|243466|2|1|If you proceed with the repair or place an order for a|Y
01|243466|2|2|new RT L-N will cover this cost.|Y
01|243467|1|1|INCQ2601-0233 0003 - please note this is considered|Y
01|243467|1|2|special. Once PO/order issued these cannot be cancelled|Y
01|243467|1|3|or returned.|Y
01|243467|3|1|INCQ2601-0233 0008 - please note this is considered|Y
01|243467|3|2|special. Once PO/order issued these cannot be cancelled|Y
01|243467|3|3|or returned.|Y
01|243467|5|1|INCQ2601-0233 0010|Y
01|243467|7|1|INCQ2601-0233 0009 - please note this is considered|Y
01|243467|7|2|special. Once PO/order issued these cannot be cancelled|Y
01|243467|7|3|or returned.|Y
01|243496|1|1|Overstock Item - cannot be cancelled or returned|Y
01|243496|1|2|upon receipt of PO|Y
01|243496|2|1|Additional 20% discount for Overstock Items|Y
01|243497|1|1|FOR DNM6700 W/ FANUC OI-MF+ CONTROL|Y
01|243504|1|1|Overstock Item - Additional 20% Overstock Promo|Y
01|243504|1|2|discount applied. **non-cancellable non-returnable**|Y
01|243512|1|1|5AX-350WAR21|Y
01|243512|1|2|Tilt Table 350mm HydBrake|Y
01|243517|1|1|Repair on-site of customers Elbo Controlli|Y
01|243517|1|2|Sethy Six Presetter SN# 5610|Y
01|243517|1|3|Date: TBD|Y
01|243517|5|1|Service Call On-Site (ESTIMATE) for Travel/Time/Labor|Y
01|243517|5|2|and Expenses|Y
01|243521|1|1|EXTERNAL POWER/FEEDBACK CABLES ARE HARDWIRED INTO|Y
01|243521|1|2|ROTARY TABLE TO ELECTRICAL CABINET|Y
01|243521|1|4|POLAR DETECT OPTION MUST BE TURNED ON PRIOR TO INSTALL|Y
01|243521|1|6|INSTALLATION IS NOT INCLUDED IN THIS QUOTATION|Y
01|243525|1|1|5AX-250WAR21|Y
01|243525|1|2|Tilt Table 250mm HydBrake|Y
01|243527|2|1|EZBOT-100VR-BASE|Y
01|243527|2|2|RIGHT HAND SIDE LOAD FOR DVF-5000 OR SIMILAR|Y
01|243527|2|3|FACTORY ORDER??? LEAD TIME???|Y
01|243527|4|1|PROVISIONED FOR DVF-5000 GEN2|Y
01|243527|4|2|A/B AIR PASS THROUGH FOR P160 SERIES SC VISE|Y
01|243527|4|3|MACHINE TABLE PRINT REQUIRED AT TIME OF ORDER|Y
01|243527|10|1|OPTIONAL WITH SAFETY FEEDBACK IoT|Y
01|243527|19|1|EZBOT-EOAT-ZV-P160|Y
01|243527|19|2|PASSIVE GRIPPER FOR ZERO VISE P160|Y
01|243540|1|1|Non-cancellable Non-returnable after invoicing|Y
01|243548|1|1|Estimated lead time is 12~14 Weeks after receipt of an|Y
01|243548|1|2|order.|Y
01|243548|4|1|Additiional 20% discount applied for our Overstock|Y
01|243548|4|2|Promotion.  Once a Purchase Order has been received|Y
01|243548|4|3|this item cannot be cancelled or returned.|Y
01|243548|11|1|Estimated lead time is end of March/early April.|Y
01|243559|1|1|Final Part# CAT40-SF0375-3.15CP-DIN-M  **NET PRICE**|Y
01|243559|1|2|CAT40 Shrink Fit Holder 3/8 CoolantPorts 25K w/DIN_MOD|Y
01|243559|2|1|**NET PRICE**|Y
01|243559|3|1|Final Part# CAT40-SF0625-3.15CP-DIN-M  **NET PRICE**|Y
01|243559|3|2|CAT40 Shrink Fit Holder 5/8 CoolantPorts 25K w/DIN_MOD|Y
01|243559|4|1|**NET PRICE**|Y
01|243559|5|1|**NET PRICE**|Y
01|243559|6|1|**NET PRICE**|Y
01|243562|1|1|Currently two (2) in stock.  Lead time for the balance|Y
01|243562|1|2|will be 2~3 days.|Y
01|243565|1|1|These are non-standard stock items and considered|Y
01|243565|1|2|specials. Once a PO has been issued these items|Y
01|243565|1|3|cannot be cancelled or returned.|Y
01|243567|2|1|Additional 20% discount applied for our Overstock|Y
01|243567|2|2|Promotion.  Once a Purchase Order has been received|Y
01|243567|2|3|this item cannot be cancelled or returned.|Y
01|243578|1|1|RGA#LVR-62585/|Y
01|243578|1|2|Repair of MU55-SK16Z-125-ICE SN:2290705902 (Mim#201362)|Y
01|243578|2|1|Bearings seals o-rings spindle to be replaced|Y
01|243589|1|1|LIST PRICE = $230 EA.|Y
01|243604|1|1|Table and motors only no external cables included.|Y
01|243609|2|1|Additional 20% discount applied for our Overstock|Y
01|243609|2|2|Promotion.  Once a Purchase Order has been received|Y
01|243609|2|3|these items cannot be cancelled or returned.|Y
01|243630|1|1|Please Note: Minimum order is 10-pcs.|Y
01|243633|1|1|P/N: IT50-EM1000-4.00|Y
01|243633|1|2|IT50 Taper 1 End Mill Holder with 4.00 gage length|Y
01|243638|1|1|1st batch(w/IDU) 5/21/25:DWG APRVED/TR|Y
01|243670|1|1|Includes 10 holders at no cost with SF machine|Y
01|243688|13|1|replacement wrench|Y
01|243689|1|1|SN:8086 EU:Waukesha Machine Tool|Y
01|243689|1|2|RGA#TAR-62593 5AX-2MT-105-120SAB|Y
01|243696|1|1|INCLUDES CUSTOM ADAPTER PLATE FOR 5AX-201|Y
01|243696|1|2|MOUNTING HARDWARE INCLUDE.|Y
01|243696|1|3|MANUAL ACTUATION VALVE AND LUBRICATOR INCLUDED.|Y
01|243696|1|4|USE ON ANY VERSION 5AX-201|Y
01|243696|4|1|FEATURES A21 EXTERNAL CONTROL BOX DUAL AXIS.|Y
01|243696|4|2|REMOTE PROGRAMMING CAPABLE VIA RS232 I/F|Y
01|243696|4|3|REMOTE REQUIRES FIELD INSTALLATION SUPPORT AND|Y
01|243696|4|4|ADDITIONAL HARDWARE.|Y
01|243696|4|5|STANDARD PROGRAMMING AVAILABLE THROUGH PENDANT|Y
01|243696|4|6|CONTROL WITH OFFLINE SUPPORT.  SEE MANUAL|Y
01|243696|5|1|ADDED 5% DISCOUNT TO HELP WITH MEETING CUSTOMER|Y
01|243696|5|2|BUDGET.|Y
01|243716|1|1|SN:8249 EU:Exalta|Y
01|243716|1|2|RGA#TAR-62608 5AX-2MT-105-120BATA-BR|Y
01|243722|1|1|RGA#LVR-62585/|Y
01|243722|1|2|Repair of MU55-SK16Z-125-ICE SN:2290705902 (Mim#201362)|Y
01|243722|2|1|Bearings seals o-rings spindle to be replaced|Y
01|243733|1|1|BT30-FMA25.4-90|Y
01|243733|1|2|BT30 Shell Mill Holder 1|Y
01|243753|2|1|LN to design+mfg positioning block upon receipt of|Y
01|243753|2|2|Spindle Drawing Information. Please allow 1 week after|Y
01|243753|2|3|receipt of drawing to finish design+manufacturing.|Y
01|243758|1|1|Delivery for 2nd probe 5 months.|Y
01|243769|1|1|Delivery for 2nd probe 5 months.|Y
01|243801|3|1|Please note this is non-standard stock and considered|Y
01|243801|3|2|special. Once PO/order issued these can't be cancelled|Y
01|243801|3|3|or returned.|Y
01|243828|4|1|Part Number: BMT65-STC5Z-IC|Y
01|243828|4|2|BMT65 Static PSC C5 Z<Axial>90D IntCoolant|Y
01|243828|4|3|Quantity Breaks:|Y
01|243828|4|4|3+ pcs: $2269.00|Y
01|243828|4|5|6+ pcs: $2167.00|Y
01|243828|4|6|9+ pcs: $2073.00|Y
01|243828|4|7|*Lead time given as ADA - After Signed Drawing Approval|Y
01|243828|4|8|Please allow 1-2 weeks for procurement of approval dwg.|Y
01|243858|1|1|DEMO UNIT - Cannot be cancelled or returned after|Y
01|243858|1|2|invoicing|Y
01|243862|2|1|IT40-SMS32-75|Y
01|243863|1|1|Overhaul repair: CNCZ302FA 9+1RJ (match SR#7622)|Y
01|243863|1|2|Overhaul repair: CNC302FA-HS 11+1RJ (match SR#13569)|Y
01|243863|1|3|including replacement of consumable parts|Y
01|243863|1|4|worm wheel worm shaft-assy|Y
01|243863|3|1|Overhaul repair: CNC401TFA 11+1RJ (match SR#16054)|Y
01|243863|3|2|Overhaul repair: CNC401TFA 9+1RJ (match SR#15891)|Y
01|243863|3|3|including replacement of consumable parts|Y
01|243863|3|4|worm wheel worm shaft-assy|Y
01|243865|2|1|Spindle Wrench|Y
01|243865|3|1|Nut Wrench|Y
01|243873|1|1|TNKQ2601-0503 0019 - please note these are considered|Y
01|243873|1|2|special. Once PO/order issued these can't be cancelled|Y
01|243873|1|3|or returned.|Y
01|243878|3|1|This price is contingent upon completing all three|Y
01|243878|3|2|installations in one travel trip.|Y
01|243878|4|1|A tariff surcharge may be added to this quotation in|Y
01|243878|4|2|the event of a sustained tariff increase on the|Y
01|243878|4|3|importation of this product.  Any surcharge will be|Y
01|243878|4|4|disclosed prior to acceptance of an order.|Y
01|243880|1|1|DEMO UNIT - Cannot be cancelled or returned after|Y
01|243880|1|2|invoicing.|Y
01|243890|1|1|Currently in stock at the factory.  If ordered by|Y
01|243890|1|2|1/30/2026 estimated delivery will be the week of|Y
01|243890|1|3|2/23/2026.  If ordered after that time ETA would be|Y
01|243890|1|4|end of March.|Y
01|243890|3|1|HSK50A-HC32-100 (HSK50A Hydraulic Chuck 32mm 18K w/|Y
01|243890|3|2|100mm GL.  MINIMUM ORDER QUANTITY OF 5 PIECES|Y
01|243890|3|3|(+/- 1 piece).  Estimated lead time is 15~17 weeks|Y
01|243890|3|4|after receipt of an order.|Y
01|243914|1|1|38 pcs Stock in Japan with 2-week lead time|Y
01|243914|1|2|Remaining 62 pcs have a lead time of: 3.5 Months|Y
01|243918|2|1|Quoted at NET price.|Y
01|243923|3|1|Spindle wrench for MNL12-SK20X-ICE-10K-J|Y
01|243923|4|1|Nut wrench for MNL12-SK20X-ICE-10K-J|Y
01|243929|1|1|Includes 4.813% sales tax|Y
01|243933|2|1|Delivery: 7 currently in stock. 10pcs stock at factory|Y
01|243933|2|2|2~3 Weeks ARO. Balance 11~12 Weeks.|Y
01|243935|1|1|4th and 5th axis interface and install not included.|Y
01|243935|2|1|4th and 5th axis cables from table to bulkhead|Y
01|243945|1|1|final part# TBD|Y
01|243945|1|2|Special Koma Mounted Base Plate|Y
01|243945|1|3|for existing Koma RWB-500K table|Y
01|243945|1|4|all 6x NP138's activate at same time|Y
01|243945|1|5|Outer profile squared off instead of round|Y
01|243956|1|1|SN:16771 EU:XXX|Y
01|243956|1|2|RGA#TAR-62628 CNC321BFA|Y
01|243957|43|1|LN to make block after receipt of spindle specs|Y
01|243991|1|1|Ground|Y
01|243991|1|3|Please note:  Once a Purchase Order has been received|Y
01|243991|1|4|this item cannot be cancelled or returned.|Y
01|243991|3|1|Hard turned.|Y
01|243994|1|1|RGA#CUR-62619/|Y
01|243994|1|2|Repair of C40RAM-ER32-180-65TP SN:2290666001|Y
01|243994|1|3|(Mim#178108)|Y
01|243994|2|1|Bearings Seals O-Rings and CAT 40 Taper to be|Y
01|243994|2|2|replaced|Y
01|244008|1|1|**Cannot be cancelled or returned after invoicing**|Y
01|244024|2|1|PLEASE NOTE:  Installation includes autodoor and|Y
01|244024|2|2|robot/EZ Cart install training plus travel and lodging|Y
01|244024|2|3|expenses.  FINAL INSTALLATION AMOUNT IS SUBJECT TO|Y
01|244024|2|4|CHANGE UPON RECEIPT OF A PURCHASE ORDER.|Y
01|244029|2|1|PLEASE NOTE:  Installation includes autodoor and|Y
01|244029|2|2|robot/EZ Cart install training plus travel and|Y
01|244029|2|3|lodging expenses.  FINAL INSTALLATION AMOUNT IS SUBJECT|Y
01|244029|2|4|TO CHANGE UPON RECEIPT OF A PURCHASE ORDER.|Y
01|244031|1|1|Mimatic / Benz cross - heads pinned to the right|Y
01|244031|3|1|Mimatic / Benz cross - heads pinned to the left|Y
01|244033|1|1|SN:25020R EU:Turn-Key Solutions Inc.|Y
01|244033|1|2|RGA#TAR-62663 CNCZ180LSABR2|Y
01|244034|1|1|Spindle Wrench for MZQT5-ER40X-OFF-ICE|Y
01|244040|1|1|SN:25019T EU:Turn-Key Solutions Inc.|Y
01|244040|1|2|RGA#TAR-62623 CNCZ180LSABR2|Y
01|244043|1|1|Includes external cable set|Y
01|244049|1|1|1st Batch/For stock 11/10/25:Spec Change/2-port|N
01|244061|2|1|**Special** Cannot be cancelled or returned|Y
01|244065|1|1|Quoted at NET Price|Y
01|244065|2|1|Quoted at NET price.|Y
01|244068|2|1|Please Note: When purchasing CAT40-UMT200UW it comes|Y
01|244068|2|2|with the 9UMT-SH. Please verify that your customer|Y
01|244068|2|3|wants the 9UMT-SBH.|Y
01|244069|1|1|Please note this is non-standard stock and considered|Y
01|244069|1|2|special. Once PO/order issued these can't be cancelled|Y
01|244069|1|3|or returned.|Y
01|244079|1|1|Additional 20% Overstock Promo applied|Y
01|244079|1|2|**non-cancellable non-returnable**|Y
01|244082|1|1|Additional 20% Overstock discount added to standard 35%|Y
01|244082|1|2|discount.Overstock items are Final Sale.|Y
01|244082|2|1|Modified holders are non-returnable/non-cancellable|Y
01|244082|6|1|Modified holders are non-returnable/non-cancellable.|Y
01|244085|1|1|SN:7406 EU:Ferrous Engineering|Y
01|244085|1|2|RGA#TAR-62597 5AX-201YA-M|Y
01|244092|1|1|SN:7406 EU:Ferrous Engineering|Y
01|244092|1|2|RGA#TAR-62597 5AX-201YA-M|Y
01|244093|7|1|HSK100A-FMH22-47-150|Y
01|244093|8|1|HSK100A-FMH22-47-200|Y
01|244104|1|1|TAM230168 REV.NC|Y
01|244108|1|1|SN:16771 EU:PTS|Y
01|244108|1|2|RGA#TAR-62628 CNC321BFA|Y
01|244109|1|1|APPLICATION DATA:|Y
01|244109|1|2|HAAS VF4 CAT40 BASIC MILLING AND DRILLING|Y
01|244109|1|3|OPERATIONS. TITANIUM AND COPPER ALLOYS|Y
01|244109|1|4|SLOW TOOL CHANGE SPEED - BY PARAMETER - HFO|Y
01|244109|1|5|THROUGH SPINDLE COOLANT CAPABLE; CAN RUN DRY|Y
01|244109|1|6|FILTRATION 50um OR BETTER REQUIRED.|Y
01|244109|4|1|MACHINE SPINDLE DRAWING RQR'D AT TIME OF ORDER|Y
01|244112|2|1|bill is stupid|Y
01|244113|1|1|APPLICATION DATA:|Y
01|244113|1|2|HAAS VF4 CAT40 BASIC MILLING AND DRILLING|Y
01|244113|1|3|OPERATIONS. TITANIUM AND COPPER ALLOYS|Y
01|244113|1|4|SLOW TOOL CHANGE SPEED - BY PARAMETER - HFO|Y
01|244113|1|5|THROUGH SPINDLE COOLANT CAPABLE; CAN RUN DRY|Y
01|244113|1|6|FILTRATION 50um OR BETTER REQUIRED.|Y
01|244113|10|1|MACHINE SPINDLE DRAWING RQR'D AT TIME OF ORDER|Y
01|244121|2|1|ZKG16-12D-100L|Y
01|244121|3|1|ZKG16-10D-100L|Y
01|244121|5|1|ZKG12-10D-100L|Y
01|244121|6|1|ZKG12-12D-100L|Y
01|244124|3|1|LN to make block after receipt of spindle specs|Y
01|244124|3|2|necessary for design|Y
01|244130|2|1|*LN to design+manufacture positioning block. Estimated|Y
01|244130|2|2|1 week after receipt of spindle drawing+PO|Y
01|244137|1|1|match with SN#41642TC|Y
01|244137|1|2|include the following accessories|Y
01|244137|1|3|TCE-A7026/9A cable|Y
01|244137|1|4|TCE-A94808/5 cable|Y
01|244137|1|5|TCD-A3515-R (3+1PRJ)|Y
01|244150|1|1|Estimated lead time will be 10~12 weeks after receipt|Y
01|244150|1|2|of an order.|Y
01|244152|1|1|Estimated lead time is 8~10 weeks after receipt of an|Y
01|244152|1|2|order.  QUOTED AT NET PRICING.|Y
01|244152|3|1|Estimated lead time is 8~10 weeks after receipt of an|Y
01|244152|3|2|order.  QUOTED AT NET PRICING.|Y
01|244157|1|1|RGA#LVR-62506/|Y
01|244157|1|2|Returning customer's unrepairable BT40-C1.1/4-90|Y
01|244157|1|3|Unable to be repaired customer declined replacement|Y
01|244168|1|1|With Haas motor and cable sets.|Y
01|244178|1|1|Discontinued Item - cannot be cancelled or returned|Y
01|244194|1|1|RGA#QUA-62489/|Y
01|244194|1|2|Repair of C40RAM-ER25-180-65TP S/N: 22902883 02|Y
01|244194|1|3|Mimatic#184915|Y
01|244194|2|1|Replace bearings seals and o-rings.  CAT40 spindle|Y
01|244194|2|2|needs to be replaced.  Flange assembly and locating|Y
01|244194|2|3|pin assembly needs to be replaced.|Y
01|244200|1|1|1st Batch T/P Inspection Required S#1020000 9/30:APRVED|N
01|244200|2|1|1st Batch T/P Inspection Required S#1020000 9/30:APRVED|N
01|244202|1|1|1st Batch  8/28 approved|N
01|244214|1|1|Precio unitario en la compra de 1 pieza|Y
01|244214|1|2|Shank VDI50 similar DIN ISO 10889 S1=935|Y
01|244214|1|3|Drive DIN 5480 W24X1.25X30X18/9b(Rotation lock)|Y
01|244214|1|4|Tooling interface for collet system ER40 (1-20MM)|Y
01|244214|1|5|Internal coolant throught the spindel and external|Y
01|244214|1|6|Grade of filtration: max 0.05 mm|Y
01|244214|1|7|Continuous dryrun possible with sufficent cooling phase|Y
01|244214|1|8|Max temperture of 90oC must not be exceeded-no reversal|Y
01|244214|2|1|Precio unitario en la compra de 2 piezas.|Y
01|244215|7|1|Includes drive unit and interface cables from|Y
01|244215|7|2|machine cabinet to bulkhead.|Y
01|244216|1|1|CF130-25-04  cable 500mm|Y
01|244216|2|1|CF130-05-12  cable 500mm|Y
01|244216|3|1|STRAIN RELIEF|Y
01|244216|7|1|#6 packing|Y
01|244229|14|1|MAKINO MML LICENSING FEE MAY APPLY. THIS QUOTE DOES|Y
01|244229|14|2|NOT INCLUDE ANY UNFORSEEN OPTION CONTENT FROM MAKINO|Y
01|244229|14|3|WE UNDERSTAND THAT THE MACHINE IS MML READY AND|Y
01|244229|14|4|SHOULD BE CLOSE TO PLUG AND PLAY.|Y
01|244229|14|5|ANY ADDITIONAL SUPPORT FROM MAKINO TO MEET THE PLUG|Y
01|244229|14|6|AND PLAY CONDITION WILL BE EU RESPONSIBILITY|Y
01|244229|16|1|APPLICATION DATA:|Y
01|244229|16|2|MAKINO a81 PRO5 CONTROL. CUSTOMER USES MAKINO TOOL|Y
01|244229|16|3|DATA PAGE FOR MANAGING PTN AND ETN DATA. TOOL LIFE|Y
01|244229|16|4|DATA TO BE MANAGED BY TID TERMINAL AND STORED ON|Y
01|244229|16|5|TID DATABASE. R/W PROCESS TO BE CONDUCTED AT THE|Y
01|244229|16|6|MACHINE TiD TERMINAL VIA HMI.|Y
01|244229|16|7|CUSTOMER TO SUPPLY LASER MARKER FOR QR CODE MARKING|Y
01|244229|16|8|A SAMPLE TO BE PROVIDED.|Y
01|244232|1|1|Estimated lead time is mid/end April.|Y
01|244241|1|1|Fanuc Motor Alpha iS8/4000 Taper|Y
01|244246|6|1|Currently one in stock.|Y
01|244246|6|2|Minimum Order Quantity for an order is 10 pieces with|Y
01|244246|6|3|a 10% overrun/underun and an estimated lead time of|Y
01|244246|6|4|14~16 weeks.  This is considered special non-standard|Y
01|244246|6|5|stock and cannot be cancelled or returned after receipt|Y
01|244246|6|6|of an order for the minimum of 10 pieces.|Y
01|244246|7|1|Additional 20% discount applied for Overstock|Y
01|244246|7|2|Promotion.  Once a Purchase Order has been received|Y
01|244246|7|3|this item cannot be cancelled or returned.|Y
01|244250|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|244251|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|244266|1|1|Final Part# TBD **NET PRICE**|Y
01|244266|1|2|Custom Tool - cannot be cancelled or returned upon|Y
01|244266|1|3|receipt of PO.|Y
01|244266|2|1|Final Part# TBD **NET PRICE**|Y
01|244266|2|2|Custom Tool - Cannot be cancelled or returned upon|Y
01|244266|2|3|receipt of PO|Y
01|244266|3|1|LN to make block after receipt of spindle specs|Y
01|244266|3|2|necessary for design|Y
01|244266|3|3|Custom tool: cannot be cancelled or returned|Y
01|244266|3|4|**NET PRICE**|Y
01|244273|1|1|SN:3930 EU:Solutions G00|Y
01|244273|1|2|RGA#TAR-62510 5AX-130FA-M|Y
01|244282|1|1|SN:xxxx EU: HBT Manufacturing Inc|Y
01|244282|1|2|MC:DN Solutions Model: DNM5700|Y
01|244282|2|1|External Cable Set up to 10ft|Y
01|244282|2|2|1 set for each axis|Y
01|244282|3|1|SN:xxxx 5AX-130FA-M EU: HBT Manufacturing Inc|Y
01|244282|3|2|MC:DN Solutions Model: DNM5700|Y
01|244287|1|1|Additional 10% SK KIT PROMO discount applied|Y
01|244288|1|1|No Inspection Required|Y
01|244288|2|1|No Inspection Required|Y
01|244293|3|1|Tight Tqr: SK25 8-10mm : 44-52 Ft-Lbs|Y
01|244293|3|2|12mm+ : 52-85 Ft-Lbs|Y
01|244294|1|1|Placeholder for C5006-0750-4.00DIN-M - CAT50 3/4 end|Y
01|244294|1|2|mill with 4 gage length and DIN modification.|Y
01|244316|1|1|**NET PRICE**|Y
01|244316|1|2|Custom Tool - Cannot be cancelled or returned upon|Y
01|244316|1|3|receipt of PO|Y
01|244317|2|1|Delivery: 18pcs STOCK 7pcs ETA 2/20 Balance 10-12Wks|Y
01|244317|3|1|Delivery: 16pcs STOCK 8pcs ETA 2/20 Balance 10-12Wks|Y
01|244327|1|1|Ref Position 203|Y
01|244327|2|1|Ref Position 204|Y
01|244327|3|1|Ref Position 324|Y
01|244327|4|1|Ref Position 350|Y
01|244327|5|1|Ref Position 364|Y
01|244337|2|1|Part# BMT45-C3Z-ICE  **NET PRICE**  No Min Order QTY|Y
01|244337|2|2|BMT45 PSC3 Axial Live Tool (Z-axis 90deg)|Y
01|244337|2|3|SPECIAL: non-cancellable non-returnable.|Y
01|244337|2|4|DELIVERY: 3 Weeks after receipt of signed approval|Y
01|244337|2|5|drawing|Y
01|244337|3|1|Part# BMT45-C3X-ICE  **NET PRICE**  No Min Order QTY|Y
01|244337|3|2|BMT45 PSC3 Radial Live Tool (X-axis straight)|Y
01|244337|3|3|SPECIAL: non-cancellable non-returnable|Y
01|244337|3|4|DELIVERY: 3 Weeks after receipt of signed approval|Y
01|244337|3|5|drawing|Y
01|244341|1|1|EU: Tokai Carbon GS Inc. (Rochester NY)|Y
01|244341|1|2|Enshu GE480H/SN746 CAT40(2Lock) spindle 15K rpm|Y
01|244350|1|1|APPLICATION NOTES:|Y
01|244350|1|2|FOR DNM5700L VMC W/ FANUC 0I-MF+|Y
01|244350|1|3|RIGHT SIDE TABLE INSTALLATION W-H DESIGN PENDING|Y
01|244350|7|1|SET OF 4 LOCATION KEYS FOR M120S TO 5AX-201 TABLE|Y
01|244350|7|2|SEE TIM REEVES|Y
01|244350|20|1|USED TABLE SN: 6671|Y
01|244350|20|2|PRICE INCLUDES ADDING ON MOTORS|Y
01|244350|20|3|ALL USED CARRIES STANDARD CONDITIONAL WARRANTY|Y
01|244350|20|4|TABLE IS PREPPED AND COMPLETES SAME RIGOROUS PRE-|Y
01|244350|20|5|SHIPMENT QUALITY CHECKS. PERFORMANCE MEETS NEW|Y
01|244350|20|6|PRODUCT FUNCTION.|Y
01|244350|20|7|USED MEANS SOME COSMETIC WEAR LIKE PAINT CHIPS|Y
01|244350|20|8|SCRATCHES ETC. SHOULD BE EXPECTED.|Y
01|244353|2|1|(2)stock at Vendor /(7) 4~5 wks / (4) 7~8 Wks|Y
01|244353|3|1|(2)stock at Vendor /(7) 4~5 wks / (4) 7~8 Wks|Y
01|244363|1|1|3 stock in Illinois 2 week delivery on remaining|Y
01|244363|1|2|pieces.|Y
01|244368|1|1|TRUNK STOCK DEMO UNIT; WILL HAVE SAME WARRANTY AS NEW|Y
01|244377|1|1|DELIVERY: mid-Feb for order placed by 1/27 mid-March|Y
01|244377|1|2|for order placed after|Y
01|244377|2|1|DELIVERY: 1pc mid-Feb for order placed by 1/27 or|Y
01|244377|2|2|mid-March for after|Y
01|244377|2|3|Balance 1 pc 14 Wks.|Y
01|244393|1|1|Currently one (1) in stock in Illinois.  Estimated|N
01|244393|1|2|nead time for the balance of one (1) is 3~4 weeks as|N
01|244393|1|3|there currently is stock at the factory.|N
01|244398|1|1|Price includes travel and expenses price does not|Y
01|244398|1|2|include oil change.|Y
01|244405|4|1|This hydraulic pump may change depending on machine|Y
01|244405|4|2|configuration.  This is just for standard setup.|Y
01|244432|1|1|1st batch/RPLC GL195|Y
01|244436|1|1|Discontinued Item - Cannot be cancelled or returned|Y
01|244436|1|2|upon receipt of order|Y
01|244436|1|3|**NET PRICE**|Y
01|244440|9|1|BT30-SK20-60P-J|Y
01|244446|1|1|2 pcs available 2/16|Y
01|244446|1|2|7 pcs available 4/1/26|Y
01|244446|1|3|additional stock 8wks mfg plus shipping time|Y
01|244447|1|1|Wrenches included with this|Y
01|244447|2|1|Wrenches listed below not included|Y
01|244453|1|1|P&W Part Number TAM211006-A to be etched on toolholders|Y
01|244453|1|2|and packaging.|Y
01|244466|1|1|CAT50-C32-400U-IDU - please note this is considered|Y
01|244466|1|2|special and has been quoted at special net price. Once|Y
01|244466|1|3|PO/order issued these cannot be cancelled or returned.|Y
01|244468|1|1|RGA#CUR-62592/|Y
01|244468|1|2|Repair of C40RA-0025M SN:7543514 (Mim#175241)|Y
01|244468|2|1|Bearings seals o-rings and Spindle to be replaced|Y
01|244470|1|1|CNC400HFA 6+3P|Y
01|244470|1|2|Matching serial #6007 (assumed)|Y
01|244470|1|3|This is a tentative estimate and may be readjusted|Y
01|244470|1|4|after RT inspection at our facility|Y
01|244470|1|5|This estimate is at Net Pricing|Y
01|244472|1|1|CNC400HFA 6+3P|Y
01|244472|1|2|Matching serial #6007 (assumed)|Y
01|244472|1|3|This is a tentative estimate and may be readjusted|Y
01|244472|1|4|after RT inspection at our facility|Y
01|244472|1|5|This estimate is at Net Pricing|Y
01|244480|1|1|Etch Pratt & Whitney code (PT910737 REV -) on tools|Y
01|244480|1|2|and packaging.|Y
01|244481|2|1|*Alternative offered with special one-time discount*|Y
01|244493|1|1|CMX special pricing includes installation.|Y
01|244500|14|1|Please Note: There is a minimum order of 5 tools.|Y
01|244500|14|2|Delivery is based upon receipt of order after final|Y
01|244500|14|3|approval drawing is received. Please allow additional|Y
01|244500|14|4|time for the drawing approval process. This holder is|Y
01|244500|14|5|Special once a purchase order is placed it cannot be|Y
01|244500|14|6|cancelled or returned. Thank you|Y
01|244500|16|1|Price reflects a minimum order of 5 tools.|Y
01|244500|16|2|Please note: Delivery is based upon receipt of order|Y
01|244500|16|3|after final signed drawing is received. Please allow|Y
01|244500|16|4|addtional time for the print approval process. Once|Y
01|244500|16|5|a purchase order is placed it cannot be cancelled or|Y
01|244500|16|6|returned. Thank you|Y
01|244515|2|1|Lead time is 3~5 days after design approval.|Y
01|244526|1|1|CNC501TFA 10+1|Y
01|244526|1|2|Serial# xxxx|Y
01|244526|1|3|Estimated overhaul price for captioned RT for|Y
01|244526|1|4|Honda Dev & Mfc Ameria Transmission.- GA.|Y
01|244526|1|5|This estimated pricing may be readjusted after|Y
01|244526|1|6|RT inspection/evaluation.|Y
01|244526|1|7|Showing at Net pricing.|Y
01|244526|1|8|Delivery truck fee is not included and|Y
01|244526|1|9|the delivery fee will be addtionally charged.|Y
01|244558|1|1|High column required to clear cylinders|Y
01|244558|6|1|TCD-24440-P|Y
01|244558|6|2|The cylinder size has been designed to be larger in|Y
01|244558|6|3|to secure a pulling force of 1360 kgf|Y
01|244561|1|1|Please note this is non-standard stock and considered|Y
01|244561|1|2|special. Once PO/order issued these can't be cancelled|Y
01|244561|1|3|or returned.|Y
01|244577|7|1|Special non-standard stock - non-cancellable|Y
01|244577|7|2|non-returnable item|Y
01|244582|1|1|RGA#TAR-62665|Y
01|244582|1|2|Returning customer's CNC180FA SN:6380|Y
01|244582|1|3|Customer declined repair. Returning disassembled.|Y
01|244585|5|1|Option for MST A63-SLK 12-75|Y
01|244589|1|1|Estimated lead time is 12~14 weeks after receipt of|Y
01|244589|1|2|an order.  No approval drawing is needed as long as the|Y
01|244589|1|3|specifications are for the same exact holder from the|Y
01|244589|1|4|last order from 2023 (PO # 14813/ SO # 962148).|Y
01|244590|1|1|Estimated lead time is 1~2 weeks after receipt of an|Y
01|244590|1|2|order.|Y
01|244592|1|1|9 pieces ETA 2/16|Y
01|244592|1|2|31 pieces 8-10wks mfg + shipping time|Y
01|244605|11|1|Estimated lead time is 10~12 weeks after receipt of|Y
01|244605|11|2|an order.|Y
01|244608|1|1|INCQ2601-1196 0009 - please note these are non-standard|Y
01|244608|1|2|stock and considered special. Once PO/order issued|Y
01|244608|1|3|these cannot be cancelled or returned.|Y
01|244626|1|1|HSK40A-SK16-80P (HSK40A SlimChuck SK16 HiSpeed 80mm GL)|Y
01|244626|1|2|Estimated lead time would be 2~3 weeks after receipt of|Y
01|244626|1|3|an order.|Y
01|244626|12|1|Estimated lead time is 2~3 weeks after receipt of an|Y
01|244626|12|2|order.|Y
01|244636|4|1|3 pieces in stock|Y
01|244636|4|2|6 pieces ETA 2/25|Y
01|244636|4|3|1 piece ETA 5/1|Y
01|244646|1|1|TNKQ2601-0981 0001|Y
01|244656|1|1|Additional 20% discount has been applied for our|Y
01|244656|1|2|Overstock Promotion.  Once a Purchase Order has been|Y
01|244656|1|3|received this item cannot be cancelled or returned.|Y
01|244667|1|1|**NET PRICE** Min Order Qty 5pcs|Y
01|244667|1|2|Non-cancellable non-returnable item|Y
01|244672|1|1|**NET PRICE**|Y
01|244672|1|2|BMT45 PSC3 Radial Live Tool (X-Axis Straight)|Y
01|244672|2|1|**NET PRICE**|Y
01|244672|2|2|BMT45 PSC3 Radial Live Tool|Y
01|244672|4|1|**NET PRICE**|Y
01|244672|4|2|BMT45 PSC3 Axial Live Tool|Y
01|244672|5|1|**NET PRICE**|Y
01|244672|5|2|BMT45 PSC3 Axial Live Tool|Y
01|244674|1|1|CMX1100 Special Priceincludes 4th axis interface|Y
01|244674|1|2|and installation|Y
01|244677|1|1|CMX1100 Special Priceincludes 4th axis interface|Y
01|244677|1|2|and installation|Y
01|244678|1|1|Overstock Promo - Additional 20% discount applied|Y
01|244678|1|2|**Non-cancellable non-returnable**|Y
01|244678|2|1|Overstock Promo - Additional 20% discount applied|Y
01|244678|2|2|**Non-cancellable non-returnable**|Y
01|244678|3|1|Overstock Promo - Additional 20% discount applied|Y
01|244678|3|2|**Non-cancellable non-returnable**|Y
01|244680|1|1|Please note this is non-standard stock and considered|Y
01|244680|1|2|special. Once PO/order issued these can't be cancelled|Y
01|244680|1|3|or returned.|Y
01|244684|1|1|Mimatic# 196999  VDI40 Tooling interface Capto C4|Y
01|244684|1|2|External coolant over pipesreversal rotationDrive|Y
01|244684|1|3|direction unequal output direction L=106mmgear ratio|Y
01|244684|1|4|gear ratio: i(n1/n2)= 1:2 - max. torque: M(max)=40 Nm|Y
01|244684|1|5|max ingoing revolution: n1(max)= 5.750rpm|Y
01|244684|1|6|max. outgoing revolution: n2(max)= 11.500rpm|Y
01|244684|1|7|- weight around. 55 kg|Y
01|244684|2|1|Mimatic #196998 VDI40 similar DIN ISO 10889 (DIN69880)|Y
01|244684|2|2|Drive Twoflat AF 11mmTooling interface Apto C4|Y
01|244684|2|3|Int coolant through the spindle& Ext coolant over pipes|Y
01|244684|2|4|grade of filtarion:max 005mm.Continous dryrun possible|Y
01|244684|2|5|w/sufficent cooling phase max emp of 90degrees C (194F)|Y
01|244684|2|6|must not exceed.No revesal of roation.(Drive direction|Y
01|244684|2|7|equal output direction)L=86.5mmgear ratio:i(n1/n20)1:1|Y
01|244684|2|8|max coolant pressure:p(max)=70bar(1051 PSI)max torque|Y
01|244684|2|9|M(max)=80Nmmax.ingoing revolution:n1(max)=7.500rpm|Y
01|244684|2|10|max outgoing revolution:n2(mx)=7500rpmwt around  5kg|Y
01|244684|3|1|Mimatic# 123916|Y
01|244684|3|2|Shank VDI 40 similar DIN ISO 10889 (DIN 69880)|Y
01|244684|3|3|drive similar DIN 1809 for Emag-LTC-turret SW 1095mm|Y
01|244684|3|4|tooling interface for collet systeminterface collet|Y
01|244684|3|5|ER32(10-200mm) according DIN 64.Ext coolant supply|Y
01|244684|3|6|over coolant pipe.L1=80mmgear ratio:i(n1/n2)=1:1|Y
01|244684|3|7|max. coolant pressure p(max) = 70 bar (1015 PSI)|Y
01|244684|3|8|max torque M(max)=80 Nm.max revolution n1(max)=7.500rpm|Y
01|244684|3|9|n2(max)=7.500 rpm|Y
01|244702|1|1|Calibration service and preventative maintenenace on|Y
01|244702|1|2|Hathor 6A Presetter SN:6679|Y
01|244702|1|3|Service performed on XX/XX|N
01|244702|2|1|On-Site Service Call ESTIMATE for Travel/Time/Labor|Y
01|244702|2|2|Travel:  hours/ Labor:  hours|Y
01|244723|8|1|**NET PRICE** 5pc Min Order QTY|Y
01|244723|8|2|Special - cannot be cancelled or returned|Y
01|244728|1|1|Warranty RPLC for FN.|Y
01|244728|1|2|1/30RY:ETA:2/3~5A(LY-2847 NCV)|N
01|244728|2|1|Warranty RPLC for FN.|Y
01|244728|2|2|1/30RY:ETA:2/3~5A(LY-2847 NCV)|N
01|244731|1|1|This item is in stock|Y
01|244747|1|1|**NET PRICE**|Y
01|244747|1|2|BMT45 PSC4 Radial Live Tool|Y
01|244747|2|1|**NET PRICE**|Y
01|244747|2|2|BMT45 PSC4 Radial Live Tool|Y
01|244747|4|1|**NET PRICE**|Y
01|244747|4|2|BMT45 PSC4 Axial Live Tool|Y
01|244747|5|1|**NET PRICE**|Y
01|244747|5|2|BMT45 PSC4 Axial Live Tool|Y
01|244750|2|1|Additional 20% discount applied for our Overstock|Y
01|244750|2|2|Promotion.  We currently have two on the shelf and they|Y
01|244750|2|3|will be discontinued after they are gone.  Once a|Y
01|244750|2|4|Purchase Order has been received this item cannot be|Y
01|244750|2|5|cancelled or returned.|Y
01|244760|1|1|Discontinued - Cannot be cancelled or returned|Y
01|244781|1|1|RGA#TOR-62666/|Y
01|244781|1|2|Returning customer's unrepaired BT40-C1.1/4-90|Y
01|244781|1|3|Item found to be unrepairable. Regreased as a courtesy.|Y
01|244790|1|1|Mimatic# 124222|Y
01|244790|1|2|shaft VDI 40 similar DIN 69880 (DIN ISO 10889)|Y
01|244790|1|3|drive per DIN 1809 Duplomatic tooling interface for|Y
01|244790|1|4|collet systemER32(10-220mmaccording DIN6499-internal|Y
01|244790|1|5|coolant supply through the spindle center& external|Y
01|244790|1|6|over coolant pipes/nozzles.Output is NOT reversal to|Y
01|244790|1|7|input!Gear ratio i=1:1max coolant pressure p(max)=70|Y
01|244790|1|8|bar (1015 psi)max torque rate M9max)=80Nmmax.spindle|Y
01|244790|1|9|revolution n(max)=6.500 rpm|Y
01|244790|2|1|Mimatic # 170933|Y
01|244790|2|2|Shank VDI40(optional: similar) DIN ISO 10889 (DIN 69880|Y
01|244790|2|3|Drive according to DIN 1809 SW8Tool holder for collets|Y
01|244790|2|4|ER 32 (30 - 200 mm) according to DIN 6499coolant|Y
01|244790|2|5|supply internal through spindle&externally via spray|Y
01|244790|2|6|tube.Reversal of direction of rotation(drive direction|Y
01|244790|2|7|not equal to output direction)-L1=70mmtransmission|Y
01|244790|2|8|ratio:i(n1/n2)=1:1max coolant pressure(max)=70 bar|Y
01|244790|2|9|(1015 psi) max torque rate M(max)=50Nm|Y
01|244790|2|10|max speed n1(max)=6000rpm n2(max)=6000rpm|Y
01|244806|1|1|Cantidad mnima de compra: 2 piezas|Y
01|244815|1|1|FOR 2015 MB-66 BRIDGE VMC|Y
01|244815|1|2|INSTALLATION BY GOSIGER/OKUMA|Y
01|244820|1|1|Quoted at NET price.|Y
01|244827|1|1|Includes Power and feed back cables from Nikken 5ax|Y
01|244827|1|2|to the machine bulkhead|Y
01|244827|2|1|Workholding Subject to change. This part is an adpater|Y
01|244827|2|2|for the WH-ZV-M80S self centering vise|Y
01|244848|1|1|Includes Power and feedback cables from the Nikken|Y
01|244848|1|2|Table to the machine bulkhead|Y
01|244848|3|1|NET PRICE|Y
01|244848|4|1|NET PRICE|Y
01|244853|1|1|WH-ZP138-BASE6-P2035|Y
01|244855|1|1|SN: 2208 Model:5AX-4MT-105-120 EU:Bryco Machine|Y
01|244860|1|1|RGA#TAR-62628/|Y
01|244860|1|2|Returning customer's disassembled CNC321BFA SN:16771|Y
01|244860|1|3|Customer declined repair requested new crate|Y
01|244860|2|1|Crate will be used for CNC321BFA same size crate|Y
01|244865|1|1|Includes 4th & 5th axis Power and interface cables|Y
01|244865|1|2|airlines from the Nikken Table to Machine Bulkhead|Y
01|244870|19|1|Currently one (1) in stock at the factory.  Estimated|Y
01|244870|19|2|lead time for the balance is approximately 20~22 weeks|Y
01|244870|19|3|after receipt of an order.|Y
01|244879|1|1|NON-RETURNABLE NON-CANCELABLE|Y
01|244879|1|2|SPECIAL DEMO UNIT PRICING|Y
01|244879|1|3|FULL MANUFACTURER'S WARRANTY|Y
01|244879|4|1|SPECIAL DEMO UNIT PRICING|Y
01|244879|5|1|SPECIAL DEMO UNIT PRICING|Y
01|244879|6|1|SPECIAL DEMO UNIT PRICING|Y
01|244879|7|1|SPECIAL DEMO UNIT PRICING|Y
01|244879|8|1|NON-RETURNABLE NON-CANCELABLE|Y
01|244879|8|2|SPECIAL DEMO UNIT PRICING|Y
01|244880|1|1|With Motor(A06B-2223-B000)|Y
01|244880|2|1|ALT for CNC202-2W|N
01|244880|3|1|ALT for CNC202-2W|Y
01|244880|3|2|With Motor(A06B-2223-B000)|Y
01|244880|5|1|CONV from CNC202-2W-250FA-M|N
01|244882|1|1|NON-RETURNABLE NON-CANCELABLE|Y
01|244882|1|2|SPECIAL DEMO UNIT PRICING|Y
01|244882|1|3|FULL MANUFACTURER'S WARRANTY|Y
01|244882|4|1|SPECIAL DEMO UNIT PRICING|Y
01|244882|5|1|SPECIAL DEMO UNIT PRICING|Y
01|244882|6|1|SPECIAL DEMO UNIT PRICING|Y
01|244882|7|1|SPECIAL DEMO UNIT PRICING|Y
01|244882|8|1|SPECIAL DEMO UNIT PRICING|Y
01|244882|8|2|NON-RETURNABLE NON-CANCELABLE|Y
01|244888|1|1|RGA#CUR-62682/|Y
01|244888|1|2|Repair of 2x C50-MRAM SN:6812305 & SN:8282901|Y
01|244888|2|1|Bearings seals and o-rings to be replaced|Y
01|244903|1|1|580MM x 580MM ZERO POINT BASE PLATE USING 6|Y
01|244903|1|2|WH-ZP138-INDX. PROVISIONS FOR OPENING ALL 6|Y
01|244903|1|3|INDEPENDENTLY OR ZONED 2-6 POTS OPEN TOGETHER.|Y
01|244903|1|4|THIS IS CONCEPT BASED FINAL ENGINEERING WILL NEED|Y
01|244903|1|5|TO BE DONE.|Y
01|244903|1|6|Delivery is one the signed approval is received|Y
01|244904|1|1|Mim P/N: 176581|Y
01|244910|1|1|SN:N/A EU:LMI Aerospace|Y
01|244910|1|2|RGA#TAR-62655 CNC302FA-M|Y
01|244914|1|1|APPLICATION NOTES: GRAPHITE MILLING W/ DUST EXTRACTION|Y
01|244914|1|2|OKUMA GENOS M560V - HIGH COLUMN OR M660V|Y
01|244914|1|3|NEED 10 TO 12 SCROLL CHUCK|Y
01|244918|1|1|Includes 4th&5th Power and feedback cables from Nikken|Y
01|244918|1|2|to the machine bulkhead|Y
01|244918|2|1|Includes 4th and 5th axis Power and feedback cables|Y
01|244918|2|2|from the Nikken Table to the Machine Bulkhead|Y
01|244918|3|1|Machine must have 4th&5th Interface Installed and 3rd|Y
01|244918|3|2|Party Option installed|Y
01|244918|3|3|Install includes Table set up Parameters MRZP and|Y
01|244918|3|4|DWO - Enduser needs to have the Haas Rotary-Axis|Y
01|244918|3|5|Calibration Tool-see attached pic|Y
01|244922|1|1|APPLICATION NOTES: FOR DN VCF850II OR VCF5500UL|Y
01|244922|1|2|FANUC 31i-MB CONTROL. TABLES REQUIRE SYNCHRONIZED|Y
01|244922|1|3|FUNCTION. CONFIRM PLC SUPPORTS DUAL A-AXIS OPERATION|Y
01|244922|1|4|ELECTRICAL AND CONTROL DATA SHEETS REQUIRED TO|Y
01|244922|1|5|FINALIZE QUOTE|Y
01|244922|3|1|18 3-JAW SCROLL CHUCK WITH ASME TOP JAW|Y
01|244922|3|2|INCLUDES ADAPTER PLATE & MOUNTING HARDWARE|Y
01|244922|5|1|DUAL TABLE INSTALLATION WITH CABLE SETS HYDRAULIC|Y
01|244922|5|2|HOSES AND BULK HEADS. WORK HOLDING TO BE INSTALLED|Y
01|244922|5|3|AT TIME OF ROTARY TABLE COMMISSIONING.|Y
01|244922|13|1|HYDRAULIC TAILSTOCK W/ SAFETY SWITCHES ADV/RET|Y
01|244922|13|2|SWITCHES OR LINEAR POSITION SENSOR IF APPLICABLE|Y
01|244922|13|3|HOST MACHINE REQUIRES PLC SUPPORT AND I/O|Y
01|244922|13|4|REQUIRES ADDITIONAL SOLENOID KIT FOR HYDRAULIC UNIT|Y
01|244922|13|5|MANUAL POSITIONING VIA MACHINE T-SLOT.|Y
01|244922|13|6|AXIAL FORCE NOT TO EXCEED 9400 lbf.|Y
01|244922|13|7|STEADY REST SHOULD BE USED WHERE APPLICABLE.|Y
01|244922|13|8|INCLUDES 20 MANUAL 3 JAW SCROLL CHUCK AND ADAPTER|Y
01|244922|13|9|PLATE. PRICING HERE IS BUDGETARY.|Y
01|244941|1|1|AGW-BMT-A-65-MI50-I|Y
01|244944|1|1|List = $24625.00 ea|Y
01|244944|1|2|Discounted to RAM Precision 12%|Y
01|244944|1|3|400VAC unit only|Y
01|244944|3|1|SF-START2-UNIT-200 Demo SN: 2J7079|Y
01|244944|3|2|DEMO UNIT FOR CENTRAL REGION|Y
01|244958|1|1|**NET PRICE**|Y
01|244958|1|2|SPECIAL - cannot be cancelled or returned|Y
01|244958|2|1|**NET PRICE**|Y
01|244958|2|2|SPECIAL - cannot be cancelled or returned|Y
01|244958|3|1|DISCONTINUED - cannot be cancelled or returned|Y
01|244958|4|1|**NET PRICE**|Y
01|244958|4|2|SPECIAL - Cannot be cancelled or returned|Y
01|244958|7|1|**NET PRICE**|Y
01|244958|7|2|SPECIAL - cannot be cancelled or returned|Y
01|244958|11|1|**NET PRICE**|Y
01|244958|11|2|SPECIAL - cannot be cancelled or returned|Y
01|244958|12|1|**NET PRICE**|Y
01|244958|12|2|SPECIAL - cannot be cancelled or returned|Y
01|244958|13|1|Final Part# HSK100A-0750-8.00 **NET PRICE**|Y
01|244958|13|2|HSK100A End Mill Holder 3/4 ChipHole 25K 8 GL|Y
01|244958|13|3|SPECIAL - Cannot be cancelled or returned|Y
01|244958|13|4|DELIVERY: Please allow 1-2 wks design time plus 16Wks|Y
01|244958|13|5|MFG/Shipping after approval drawing is signed by the|Y
01|244958|13|6|customer|Y
01|244973|1|1|RGA#QUA-62686|Y
01|244973|1|2|Returning customer's BMT45-SK20Z-ICE repaired/warranty|Y
01|244979|1|1|**NET PRICE**|Y
01|244979|1|2|Special - cannot be cancelled or returned upon receipt|Y
01|244979|1|3|of PO|Y
01|244988|3|1|Techniks 25.122.16. 090|Y
01|244988|6|1|Techniks #25.653.58.250|Y
01|244988|7|1|Techniks #25.653.56.250|Y
01|244988|8|1|Techniks #67.05.046.001|Y
01|245005|1|1|Mim P/N: 176581|Y
01|245008|3|1|Please allow 4.5 months manufacturing time.|Y
01|245008|5|1|Wrench for CAT40-MMC4-90U-AA-IDU &|Y
01|245008|5|2|NCAT40-MMC4-90U-AA-IDU.|Y
01|245008|7|1|Please note this is non-standard stock and considered|Y
01|245008|7|2|special. Once PO/order issued these can't be cancelled|Y
01|245008|7|3|or returned.|Y
01|245013|1|1|SN. 6552 5AX-201 EU: CARR Machine&Tool|Y
01|245013|1|2|Machine: Haas|Y
01|245013|1|3|Service Call 1-23-2026|Y
01|245015|1|1|SN: 8124  5AX-2MT-105-120SA3|Y
01|245015|1|2|Machine: Brother Model:TC-32A SN: 111821|Y
01|245015|1|3|Service Call on 1-30-2026|Y
01|245016|1|1|NIT50-SK10C-105|Y
01|245016|1|2|Dual contact SK50 ISO50 SlimChuck SK10 105 gauge length|Y
01|245016|2|1|NIT50-SK10C-135|Y
01|245016|2|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|245016|3|1|NIT50-SK10C-165|Y
01|245016|3|2|Dual contact SK50 ISO50 SlimChuck SK10 165 gauge length|Y
01|245016|4|1|NIT50-SK16C-105|Y
01|245016|4|2|Dual contact SK50 ISO50 SlimChuck SK16 105 gauge length|Y
01|245016|5|1|NIT50-SK16C-135|Y
01|245016|5|2|Dual contact SK50 ISO50 SlimChuck SK16 135 gauge length|Y
01|245016|6|1|NIT50-SK16C-165|Y
01|245016|6|2|Dual contact SK50 ISO50 SlimChuck SK16 165 gauge length|Y
01|245021|2|1|Please Note: Discount reflects our Overstock promo|Y
01|245021|2|2|Holder is coolant thru (NO CP Cooalnt Ports)and is not|Y
01|245021|2|3|returnable.|Y
01|245025|1|1|1st Batch/S#1025844|Y
01|245025|2|1|1st Batch/Ins'l E32-NUT & ER32-SCREW(C)/S#1028685|Y
01|245027|1|1|SN: 6509 5AX201BSA-BR2|Y
01|245027|1|2|Machine: Brother Model: 650|Y
01|245027|1|3|Service Call 10-30-2025|Y
01|245027|4|1|Service Call 12-22-2025|Y
01|245027|17|1|Service Call 1-6-2026|Y
01|245029|1|1|CAT50-C32-500U-IDU - please note this is considered|Y
01|245029|1|2|special and has been quoted at special net price. Once|Y
01|245029|1|3|PO/order issued these cannot be cancelled or returned.|Y
01|245029|3|1|Please note this is non-standard stock and considered|Y
01|245029|3|2|special. Once PO/order issued these can't be cancelled|Y
01|245029|3|3|or returned.|Y
01|245029|9|1|Please note these are non-standard stock and considered|Y
01|245029|9|2|special. Once PO/order issued these can't be cancelled|Y
01|245029|9|3|or returned.|Y
01|245037|2|1|Includes 4th axis interfaceservopower and feedback|Y
01|245037|2|2|cables from the NCT200 to the machine bulkhead|Y
01|245037|2|3|Travel and Labor|Y
01|245041|1|1|NON-RETURNABLE NON-CANCELABLE|Y
01|245041|1|2|SPECIAL UNIT PRICING|Y
01|245044|9|1|SK20-18P|Y
01|245054|2|1|Part Number: ST20M-SF6-160|Y
01|245054|2|2|OD32mm ID10mm Shrink Fit Straight Shank|Y
01|245058|5|1|ER32 SPINDLE WRENCH|Y
01|245058|6|1|ER32 NUT WRENCH|Y
01|245058|7|1|ER40 SPINDLE WRENCH|Y
01|245058|8|1|ER40 NUT WRENCH|Y
01|245071|1|1|NON-RETURNABLE NON-CANCELABLE|Y
01|245071|1|2|SPECIAL UNIT PRICING|Y
01|245088|1|1|SN: 2845 NSVZ300LAR21|Y
01|245088|1|2|Machine: Mitutoyo Model: MACH 3A653 SN. 70256560|Y
01|245088|1|3|Service Day - 9-9-2025|Y
01|245094|3|1|A tariff surcharge may be added to this quotation in|Y
01|245094|3|2|the event of a sustained tariff increase on the|Y
01|245094|3|3|importation of this product.  Any surcharge will be|Y
01|245094|3|4|disclosed prior to acceptance of an order.|Y
01|245101|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|245101|2|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|245101|3|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|245101|4|1|Req.INS/OD Groove frange Dia issue|Y
01|245101|5|1|Req.INS/OD Groove frange Dia issue|Y
01|245101|6|1|Req.INS/Black Oxide Issue|Y
01|245114|2|1|DELIVERY: Mid-March for PO placed before 2/23|Y
01|245119|1|1|Net price reflects used Shrink Fit machine. Once a|Y
01|245119|1|2|purchase order is placed it cannot be cancelled or|Y
01|245119|1|3|returned. Warranty on used equipment: 1 Year Parts|Y
01|245119|1|4|and Workmanship.|Y
01|245154|1|1|Overstock Promo - Additional 20% discount applied.|Y
01|245154|1|2|Cannot be cancelled or returned upon receipt of PO.|Y
01|245154|4|1|LN to trhead blank drawscrew after receipt of spindle|Y
01|245154|4|2|specs|Y
01|245158|1|1|Non-cancellable non-returnable after receipt of order|Y
01|245158|1|2|-Must ship via truck-|Y
01|245161|1|1|LIST PRICE CERT VALUE $14362.00|Y
01|245161|1|2|CONVERSION QUOTE #244304|Y
01|245165|1|1|P/N: TBD|Y
01|245165|1|2|BMT65 U Tool for Lathe with ER16 Output|Y
01|245165|1|3|-Shank for BMT-turret with D= 65 / S1 = 112|Y
01|245165|1|4|-Drive Twoflat AF 1000mm|Y
01|245165|1|5|-Tooling interface for collet system ER16 (1-10mm)|Y
01|245165|1|6|according DIN 6499-external coolant over pipes|Y
01|245165|1|7|-reveral of rotation (Drive direction unequal output|Y
01|245165|1|8|direction)|Y
01|245165|1|9|-L= app. 225mm|Y
01|245165|1|10|-gear ratio; i(n1/n2) = 1:1 ; max torque:M(max) = 15Nm|Y
01|245165|2|1|CONTINUED DESCRIPTION:|Y
01|245165|2|2|-max. ingoing revolution: n1(max) = 6.000rpm|Y
01|245165|2|3|-max. outgoing revolution: n2(max) = 6.000rpm|Y
01|245165|2|4|-weight around. 19 kg|Y
01|245170|1|1|Prepared for Mitsubishi motor.|Y
01|245170|4|1|311-18-A11 18 3-jaw chuck with 5.98 thru hole|Y
01|245170|4|2|adapter plate for CNCB350|Y
01|245175|1|1|For inital evaluationonce evaluated quotes will be|Y
01|245175|1|2|sent for any needed repairs/re-build.|Y
01|245175|6|1|1.181 riserA36 HRS fully annealed|Y
01|245175|6|2|blanchard and finish ground .|Y
01|245175|6|3|Quoted at NET pricing|Y
01|245175|7|1|Quoted at NET pricing|Y
01|245177|1|1|Sethy Presetter SN:4481|Y
01|245177|1|2|On-Site Service Call ESTIMATE for Travel/Time/Labor|Y
01|245177|1|3|and Expenses.|Y
01|245180|12|1|Need Confirm|Y
01|245180|29|1|FL7M-2J6HD DCNA Use FL7M-2J6HD-Z|Y
01|245180|30|1|FL7M-2K6H DCNA Use FL7M-2K6H-Z|Y
01|245185|1|1|Special non-standard stock - cannot be cancelled|Y
01|245185|1|2|or returned upon receipt of PO|Y
01|245206|1|1|RGA#LVR-62703/|Y
01|245206|1|2|Repair of C50RAM-ER32-180TS (Mim#178145)|Y
01|245206|2|1|Bearings seals o-rings and Spindle to be replaced|Y
01|245217|1|1|Part Number: NB5006-2000-1500CP|Y
01|245217|1|2|NBT50 DualContact End Mill Holder 2  CoolantPorts|Y
01|245217|1|3|g/l: 150mm|Y
01|245217|1|4|Quantity Breaks:|Y
01|245217|1|5|1-2 pcs: $2257.00/EA|Y
01|245217|1|6|3+ pcs: $923.00/EA|Y
01|245217|1|7|5+ pcs: $667.00/EA|Y
01|245217|1|8|Delivery:|Y
01|245217|1|9|12 Weeks ADA - After Signed Drawing Approval. Please|Y
01|245217|1|10|allow 1-2 weeks for creation of approval drawing.|Y
01|245229|1|1|presetter E346+ **BODY ONLY NO SPINDLE**|Y
01|245229|1|2|NON RETURNABLE OR CALCELABLE SPECIAL DEMO UNIT PRICING|Y
01|245229|1|3|FULL MANUFACTURERS WARRANTY|Y
01|245229|3|1|Sethy Presetter306 SN:5311|Y
01|245229|3|2|On-Site Service Call ESTIMATE for Travel/Time/Labor|Y
01|245229|3|3|and Expenses|Y
01|245249|1|1|Estimated lead time is 12~14 weeks after receipt of an|Y
01|245249|1|2|order.|Y
01|245249|2|1|Estimated lead time is 3~5 Days after design approval.|Y
01|245258|1|1|SN. 28275T CNCZ180L|Y
01|245258|1|2|Service Call on 1-9-2026|Y
01|245263|1|1|MAX RESALE DISCOUNT 20%|N
01|245263|2|1|W-AXIS EXTENSION HOUSING ASSEMBLY FOR KURAKI ABK-13|Y
01|245263|2|2|HOUSING IS CUSTOM BUILT TO YOUR EXTENSION REQUIREMENT|Y
01|245263|2|3|PROPOSED AS 500mm TOTAL EXTENSION FROM SPINDLE|Y
01|245263|2|4|MOUNTING FLANGE.  USE EXISTING 6-M16 BOLTS.|Y
01|245263|2|5|PROVIDE ATC INTERLOCK INSTRUCTIONS|Y
01|245263|2|6|NET PRICING ONLY|N
01|245263|2|7|LOCAL VENDOR TO BE SELECTED|N
01|245263|2|8|MODIFIED FROM DANA'S DESIGN ON TOSHIBA BP-130|N
01|245266|1|1|200MMx600MM ZERO POINT BASE PLATE WITH 3 WH-ZP138-INDX|Y
01|245266|1|2|ALL 3 ZP138's WILL CLAMP/UNCLAMP TOGETHER|Y
01|245266|1|3|All opens and closes as 1 function|Y
01|245266|2|1|200MMx600MM ZERO POINT BASE PLATE WITH 3 WH-ZP138-INDX|Y
01|245266|2|2|ALL 3 ZP138's WILL CLAMP/UNCLAMP TOGETHER|Y
01|245266|2|3|All opens and closes as 1 function|Y
01|245266|3|1|200MMx600MM ZERO POINT BASE PLATE WITH 3 WH-ZP138-INDX|Y
01|245266|3|2|ALL 3 ZP138's WILL CLAMP/UNCLAMP TOGETHER|Y
01|245266|3|3|All opens and closes as 1 function|Y
01|245266|6|1|200MMx600MM ZERO POINT BASE PLATE WITH 3 WH-ZP138-INDX|Y
01|245266|6|2|ALL 3 ZP138's WILL CLAMP/UNCLAMP INDEPENDENTLY|Y
01|245266|7|1|200MMx600MM ZERO POINT BASE PLATE WITH 3 WH-ZP138-INDX|Y
01|245266|7|2|ALL 3 ZP138's WILL CLAMP/UNCLAMP INDEPENDENTLY|Y
01|245266|8|1|200MMx600MM ZERO POINT BASE PLATE WITH 3 WH-ZP138-INDX|Y
01|245266|8|2|ALL 3 ZP138's WILL CLAMP/UNCLAMP INDEPENDENTLY|Y
01|245266|11|1|1 AirBlock needed per plate|Y
01|245270|1|1|Please note this is non-standard stock and considered|Y
01|245270|1|2|special. Once PO/order issued these can't be cancelled|Y
01|245270|1|3|or returned.|Y
01|245275|1|1|*1 pc in stock rest expected 3/30|Y
01|245283|13|1|*Price and Delivery TBD by EricH|N
01|245291|1|1|This holder is non-standard stock.  Once an order has|Y
01|245291|1|2|been placed it cannot be cancelled or returned.|Y
01|245291|1|3|Please advise if the customer needs the Makino drive|Y
01|245291|1|4|pins.|Y
01|245327|2|1|Part Number: NBT50-SK16C-300|Y
01|245327|2|2|NBT50 DualContact Slim Chuck SK16 Coolant 2.4K|Y
01|245327|3|1|Part Number: NBT50-SK13C-300|Y
01|245327|3|2|NBT50 DualContact Slim Chuck SK13 Coolant 2.4K|Y
01|245333|2|1|P/N: BMT65-ER32Z-MS-72|Y
01|245333|2|2|BMT65 Live ER32 Z<Axial> 90DEG MainSub ExtCool 72CL|Y
01|245333|6|1|ICE tool allows for running internal coolant external|Y
01|245333|6|2|coolant as well as running dry.|Y
01|245335|1|1|7 in stock|Y
01|245335|1|2|10 Stock at factory|Y
01|245335|1|3|bal MFG  3/31|Y
01|245344|4|1|Installation includes: Drive unit communications cable|Y
01|245344|4|2|fiber optic cable short bar bulkhead cables|Y
01|245344|4|3|external cables  service time and travel.|Y
01|245350|1|1|P/N: TBD|Y
01|245350|1|2|CAT40 U Tool for Mill with ER16 Output|Y
01|245350|1|3|-Shaft ANSI-CAT40 with UNC thread complete with|Y
01|245350|1|4|Standard-Torque-Arm per ISO 9524 and locking mechanism|Y
01|245350|1|5|(without machine specific stoppblock)> adjustment by|Y
01|245350|1|6|customer-side to the machining center|Y
01|245350|1|7|-for a reliable and rigid fixture onto the machine we|Y
01|245350|1|8|recommend; absolutely a 3-pin support. Otherwise we can|Y
01|245350|1|9|not give any warranty for stability stiffness and|Y
01|245350|1|10|accuracy.|Y
01|245350|2|1|DESCRIPTION CONTINUED:|Y
01|245350|2|2|-A = 110 mm / d = 28mm; tooling interface for collet|Y
01|245350|2|3|system ER16; (0.5-10.0mm) according DIN 6499|Y
01|245350|2|4|-external coolant over pipes - gear ratio: i(n1/n2)=1:1|Y
01|245350|2|5|-max. torque: M(max) = 15Nm - max. ingoing revolution:|Y
01|245350|2|6|n1(max) = 6.000rpm; max. outgoing revolution:|Y
01|245350|2|7|n2(max) = 6.000rpm|Y
01|245350|2|8|-weight around. 21kg|Y
01|245358|4|1|POSITIONING BLOCK FOR MAZAK INTEGREX I350|Y
01|245359|1|1|This item cannot be cancelled or returned once an|Y
01|245359|1|2|order has been received.|Y
01|245360|3|1|This is for on site training to use the AR21 controller|Y
01|245360|3|2|Customer will be responsible for installing table and|Y
01|245360|3|3|controller to machine prior to our arrival.|Y
01|245365|2|1|WH-ZV160-RISER-36|Y
01|245365|2|2|Riser for P160 Vise - 50mm Height - Air Pass Thru|Y
01|245366|3|1|TRUNNION CAN BE A DROP OR ON CENTER DEPENDING ON|Y
01|245366|3|2|CUSTOMER PARTS. THIS PART NUMBER IS JUST A HOLDER|Y
01|245366|3|3|UNTIL WE FIGURE OUR EXACTLY THE SIZE AND TYPE|Y
01|245366|3|4|THEY WANT.|Y
01|245380|5|1|2x ZERO POINT BASE PLATE FOR CNC260FA-M|Y
01|245380|8|1|QUICK CHANGE SK20 FIXTURE BLOCK-HOLDS 5ea K32-SK20-120|Y
01|245380|8|2|USE TO USE RT-ACCS-WKHD FOR THESE ITEMS|Y
01|245380|11|1|Adding weldon flats|Y
01|245401|7|1|Quoted at NET price.|Y
01|245408|1|1|Part Number: TBD|Y
01|245408|1|2|Fixed Right Angle Head - CAT50 Taper ER16 Slim Type|Y
01|245408|1|3|Gauge Length: 280mm.|Y
01|245408|1|4|Without coolant Angular head 360 degree adjustable|Y
01|245408|1|5|Output direction is reversal to input|Y
01|245408|1|6|L=280mm Gear Ratio i(n1/n2)=app. 1:1|Y
01|245408|1|7|Max. torque M(max)=6Nm Max Revolution=6000RPM|Y
01|245408|1|8|Weight: Approx. 12kg|Y
01|245408|1|9|Delivery: 10 Weeks ADA(+3-4 Weeks to make approval dwg)|Y
01|245408|1|10|Lead time given as ADA - After Signed Drawing Approval.|Y
01|245408|2|1|LN to design positioning block upon receipt of customer|Y
01|245408|2|2|spindle drawing.|Y
01|245408|2|3|*Please allow 1 week to manufacture+design positioning|Y
01|245408|2|4|block.|Y
01|245408|2|5|Landed cost = 7963.80ea.|N
01|245408|2|6|GP35 NET|N
01|245439|1|1|Please note this is non-standard stock and considered|Y
01|245439|1|2|special. Once PO/order issued these can't be cancelled|Y
01|245439|1|3|or returned.|Y
01|245444|21|1|CONVERSION TO SHRINK IS MY RECOMMENDED PATH.|Y
01|245444|21|2|WE WOULD BE HAPPY TO PROVIDE A LOANER SHRINK MACHINE|Y
01|245444|21|3|WHILE THEY VET THE BENEFITS OF SHRINK OVER|Y
01|245444|21|4|SIDE LOCK HOLDERS.|Y
01|245444|21|5|WE ALSO HAVE DEMO UNITS THAT CAN BE SOLD AT VERY DEEP|Y
01|245444|21|6|DISCOUNT.|Y
01|245458|7|1|Includes scale and adapter|Y
01|245462|1|1|HSK100A-2000A-6.00...HSK100A Aerospace 2 End Mill|Y
01|245462|1|2|Holder 6 GL Side Lock 5 Degree Angle & Screws.|Y
01|245463|1|1|LN to make block|Y
01|245463|1|2|Lead time 1 week after receipt of spindle Z spec|Y
01|245465|2|1|The cylinder size has been designed to be larger|Y
01|245465|2|2|to secure a pulling force of 1360 kgf.|Y
01|245470|1|1|LN to make block|Y
01|245470|1|2|Lead time 1 week after receipt of spindle Z spec|Y
01|245473|2|1|NEW VERSION OVERRUN|Y
01|245477|14|1|Delivery (1) Stock @ Factory AIR cut 2/23 for ETA to|Y
01|245477|14|2|L-N mid March.If not ordered by then delivery 10 weeks|Y
01|245483|1|1|APPLICATION: FOR NOMURA DST36D MELDAS M80 CONTROL|Y
01|245483|1|2|CUSTOMER WOULD LIKE 10 SWING|Y
01|245483|1|3|BULKHEAD MODIFICATION MAY BE REQUIRED.|Y
01|245483|1|4|MACHINE DRAWINGS WITH MAX DOUBLE TABLE SWING RQR'D.|Y
01|245486|2|1|HFO  Midwest to supply Yaskawa Sigma 7 motors.|Y
01|245486|2|2|Motors to be shipped to Mundelein for assembly|Y
01|245486|2|3|HFO responsible for field installation|Y
01|245486|2|4|Duplicate project for export to MX|N
01|245486|2|5|SHIPMENT INSTRUCTIONS FOR SIGMA MOTORS...|Y
01|245486|2|6|SHIP TO: LYNDEX-NIKKEN|Y
01|245486|2|7|ATTN: RT_ENG. REF# YOUR PO#|Y
01|245486|2|8|1468 ARMOUR BLVD.|Y
01|245486|2|9|MUNDELEIN IL  60060|Y
01|245487|1|1|IT40-CZF32-120|Y
01|245492|12|1|Please note these are non-standard stock and considered|Y
01|245492|12|2|special. Once PO/order issued these can't be cancelled|Y
01|245492|12|3|or returned.|Y
01|245496|1|1|*Discount for 5 sets any less than quantity 5 pcs will|Y
01|245496|1|2|have a standard 30% discount instead.|Y
01|245521|7|1|Currently eight (8) in stock in Illinois.  Estimated|Y
01|245521|7|2|lead time on the balance is 12~14 weeks after receipt|Y
01|245521|7|3|of an order.|Y
01|245521|24|1|Currently two (2) in stock in Illinois.  Estimated|Y
01|245521|24|2|lead time for balance of eight (8) is 12~14 weeks after|Y
01|245521|24|3|receipt of an order.|Y
01|245521|25|1|No stock in Illinois.  Estimated lead time is 12~14|Y
01|245521|25|2|weeks after receipt of an order.|Y
01|245521|26|1|Currently two (2) in stock in Illinois.  Balance of|Y
01|245521|26|2|eight (8) in stock at the factory 2 week lead time|Y
01|245521|26|3|after receipt of an order.|Y
01|245521|31|1|Currently six (6) in stock in Illinois.  Balance of|Y
01|245521|31|2|four (4) in stock at the factory 2 week lead time|Y
01|245521|31|3|after receipt of an order.|Y
01|245521|33|1|No stock in Illinois.  Estimated lead time is 2~3 weeks|Y
01|245521|33|2|after receipt of an order.|Y
01|245521|34|1|Currently five (5) in stock in Illinois.  Estimated|Y
01|245521|34|2|lead time for the balance is 2~3 weeks after receipt of|Y
01|245521|34|3|an order.  If additional quantities are needed|Y
01|245521|34|4|estimated lead time would be 12~14 weeks.|Y
01|245521|35|1|Currently two (2) in stock in Illinois.  Estimated lead|Y
01|245521|35|2|time for the balance is 12~14 weeks after receipt of an|Y
01|245521|35|3|order.|Y
01|245521|36|1|Currently three (3) in stock in Illinois.  Estimated|Y
01|245521|36|2|lead time for the balance is 2~3 weeks after receipt of|Y
01|245521|36|3|an order.|Y
01|245521|37|1|Currently five (5) in stock in Illinois.  Estimated|Y
01|245521|37|2|lead time for the balance is 4~6 weeks after receipt of|Y
01|245521|37|3|an order.  If additional quantities are needed|Y
01|245521|37|4|estimated lead time is 12~14 weeks.|Y
01|245521|38|1|Currently 121 in stock in Illinois estimated lead time|Y
01|245521|38|2|for the balance is 8~9 weeks after receipt of an order.|Y
01|245521|39|1|Currently nine (9) in stock in Illinois.  Estimated|Y
01|245521|39|2|lead time is 8~9 weeks after receipt of an order.|Y
01|245526|7|1|Currently eight (8) in stock in Illinois.  Estimated|Y
01|245526|7|2|lead time for more is 12~14 weeks after receipt of an|Y
01|245526|7|3|order.|Y
01|245526|24|1|Currently two (2) in stock in Illinois.  Estimated|Y
01|245526|24|2|lead time for balance is 12~14 weeks after receipt of|Y
01|245526|24|3|an order.|Y
01|245526|25|1|No stock in Illinois.  Estimated lead time is 12~14|Y
01|245526|25|2|weeks after receipt of an order.|Y
01|245526|26|1|Currently two (2) in stock in Illinois.  Balance of|Y
01|245526|26|2|six (6) in stock at the factory estimated lead time is|Y
01|245526|26|3|2 weeks after receipt of an order.|Y
01|245526|31|1|Currently six (6) in stock in Illinois.  Balance of|Y
01|245526|31|2|two (2) in stock at factory estimated lead time is 2|Y
01|245526|31|3|weeks after receipt of an order.|Y
01|245526|33|1|Currently 121 in stock in Illinois estimated lead time|Y
01|245526|33|2|for the balance is 8~9 weeks after receipt of an order.|Y
01|245526|34|1|Currently nine (9) in stock in Illinois.  Estimated|Y
01|245526|34|2|lead time for additional wrenches is 8~9 weeks after|Y
01|245526|34|3|receipt of an order.|Y
01|245535|1|1|38 pcs Stock in Japan with 2-week lead time|Y
01|245535|1|2|Remaining 62 pcs have a lead time of: 3.5 Months|Y
01|245537|1|1|Similar to H10ARAM-ER32-210OTC (Mimatic#166868)|Y
01|245537|1|2|machine specific adaptation to customer's existing|Y
01|245537|1|3|positioning block. HSK100A Taper/ MI40 Angle Head|Y
01|245537|1|4|Part Number to be determined. NET Price quoted for 1~2|Y
01|245537|1|5|angle heads.|Y
01|245547|1|1|This is for travel and service labor only no part cost|Y
01|245547|1|2|included. Part cost to be added after.|Y
01|245548|1|1|OLD VERSION|Y
01|245552|1|1|FOR 2 MACHINE ORDER.  GENOS M560V|Y
01|245552|3|1|Made 5% Concession to combat 60% discount from|N
01|245552|3|2|Sandvik and Kennametal. -danas|N
01|245560|2|1|Cable from rotary to table to machine bulkhead|Y
01|245563|2|1|Cable from rotary table to machine bulkhead|Y
01|245563|6|1|Please note this will need to ship via freight carrier|Y
01|245565|1|1|**Non-cancellable non-returnable item**|Y
01|245565|2|1|**NET Price** non-cancellable non-returnable|Y
01|245565|2|2|LN to make block after receipt of machine spindle|Y
01|245565|2|3|specs necessary for design|Y
01|245568|1|1|HSK63F Shell Mill Holder 3/4 1.75 GL|Y
01|245568|1|2|These are non-standard stock and considered special.|Y
01|245568|1|3|Once PO/order issued these can't be cancelled or|Y
01|245568|1|4|returned. Please allow 8 weeks delivery after signed|Y
01|245568|1|5|approval drawing. Minimum order quantity is 2 pieces.|Y
01|245572|1|1|NBT30-ZDS24-120 - TNKQ2602-0559 0016|Y
01|245572|1|3|Please note manufacturing and delivery time is 6 weeks.|Y
01|245572|1|4|These are non-standard stock and considered special.|Y
01|245572|1|5|Once PO/order issued these cannot be cancelled or|Y
01|245572|1|6|returned.|Y
01|245572|3|1|ZDK24-24 - TNKQ2602-0559 0017|Y
01|245572|3|2|Please note manufacturing and delivery time is 6 weeks.|Y
01|245572|3|3|These are non-standard stock and considered special.|Y
01|245572|3|4|Once PO/order issued these cannot be cancelled or|Y
01|245572|3|5|returned.|Y
01|245572|5|1|TNKQ2602-0559 0018|Y
01|245596|2|1|Minimum Order Quantity: 2 units|Y
01|245601|2|1|Note:Item is non-standard stock special.Once a purchase|Y
01|245601|2|2|order has been receivedit cannot be cancelled or|Y
01|245601|2|3|returned. Signed approval drawing will be required|Y
01|245601|2|4|at time of order. Allow 3-4 weeks for drawing plus|Y
01|245601|2|5|11-12 weeks for manufacturing & shipping after the|Y
01|245601|2|6|signed drawing has been received.|Y
01|245601|2|7|20% down payment required at time when purchase order|Y
01|245601|2|8|has been submitted.|Y
01|245601|2|9|Quoted at NET pricing|Y
01|245602|2|1|2 Custom riser for rotary table.  NET price only.|Y
01|245602|3|1|Custom adapter plate made to customer supplied design.|Y
01|245602|3|2|NET price only.|Y
01|245602|4|1|In-House modification for NST250 rotary table bases.|Y
01|245602|4|2|Mount holes for riser.  NET price only.|Y
01|245622|1|1|WH2 DEMO UNIT SN: 2J0108|Y
01|245622|1|2|CUSTOMER RESPONSIBLE FOR ALL SHIPPING COSTS TO AND|N
01|245622|1|3|FROM.  DEMO UNIT WILL BE OFFERED WITH OPTION TO BUY|N
01|245622|1|4|WHICH HAS BEEN QUOTED HERE|N
01|245622|1|5|WARRANTY IS 90 DAYS FROM PURCHASE.|N
01|245622|5|1|This quote represents Demo product available|Y
01|245622|5|2|for resale. RAM Precision will be provided use|Y
01|245622|5|3|for the duration of 90 days. RAM will have the option|Y
01|245622|5|4|to purchase equipment within this duration.|Y
01|245622|5|5|There is no obligation to buy.|Y
01|245622|5|6|RAM Precision is responsible for all freight costs|Y
01|245622|5|7|and retaining all packaging for the duration of|Y
01|245622|5|8|this DEMO/Consignment.|Y
01|245628|1|1|STARTER SET FOR INDIVIDUAL ASSEMBLY IN FIXTURES|Y
01|245628|1|2|OR OWN PRODUCTION OF BASE UNITS. FOR FILLING THE AIR|Y
01|245628|1|3|CHANESL WE RECOMMEND 2K-RESIGN OF 3M FILLING COMPOUND|Y
01|245628|1|4|DP270 - NOT INCLUDED.|Y
01|245628|1|5|INCLUDED:|Y
01|245628|1|6|4x CLAMPING POT WH-ZP138-INDX|Y
01|245628|1|7|10x TUBE CONNECTORS WH-ZV-ACC-TCON4|Y
01|245628|1|8|1x 5M OF 6MM AIR LINE|Y
01|245628|1|9|1x QUICK COUPLING ZC PN 10003|Y
01|245628|1|10|1x COUPLING PLUG ZC PN 10109|Y
01|245639|2|1|*To be installed w/ PS-N46E @ Factory|Y
01|245639|3|1|*To be installed w/ NC5-46-SK16C-90P @ Factory|Y
01|245639|6|1|*To be installed w/ PS-N46E @ Factory|Y
01|245639|7|1|*To be installed w/ NC5-46-SK10C-75 @ Factory|Y
01|245639|10|1|*To be installed w/ PS-N46E @ Factory|Y
01|245639|11|1|*To be installed w/ NC5-46-C20-80 @ Factory|Y
01|245639|14|1|*To be installed w/ NC5-46-SK10C-90 @ Factory|Y
01|245639|15|1|*To be installed w/ NC5-46-SK10C-90 @ Factory|Y
01|245639|17|1|*To be installed w/ PS-123 @ Factory|Y
01|245639|18|1|*To be installed w/ NC5-46-SK16C-90 @ Factory|Y
01|245639|22|1|*To be installed w/ PS-123E @ Factory|Y
01|245639|23|1|*To be installed w/ NC5-46-C25-90 @ Factory|Y
01|245639|24|1|*To be installed w/ PS-123E @ Factory|Y
01|245639|25|1|*To be installed w/ NC5-46-C20-80 @ Factory|Y
01|245642|12|1|Quoted at NET price.|Y
01|245642|12|2|Includes 2 days of installation and training.|Y
01|245646|13|1|P/N: SF-START2-UNIT-350-WCU|Y
01|245646|13|2|Shrink Fit Single Station Unit 380-480V w/o Cooling|Y
01|245646|13|3|Unit|Y
01|245650|13|1|Quoted at NET price.|Y
01|245650|13|2|Includes 2 days of installation and training.|Y
01|245656|1|1|5AX-550SA-M FACTORY ORDER 5AX-550 W/ SIEMENS|Y
01|245656|1|2|MOTORS. DRIVES AND CABLING MUST BE PROVIDED BY|Y
01|245656|1|3|DMG-MORI. INSTALLATION AND DRIVE COMMISSIONING BY OTHER|Y
01|245656|1|4|E-PLAN REQUIRED AT TIME OF ORDER.|Y
01|245656|1|5|LEAD TIME ESTIMATED WITH BOAT SHIPMENT 6MONTHS ARO|Y
01|245656|1|6|LANDED COST ESTIMATED AT $59000 USD.|N
01|245674|5|1|Special - non-cancellable non-returnable|Y
01|245674|5|2|Additional 20% Overstock Promo discount applied|Y
01|245674|6|1|Valid for MZMP46-ER25X-OFF-ICE|Y
01|245674|12|1|Mazak VDI40 Live Capto X Radial Straight Offset ICE|Y
01|245674|12|2|******UPDATE DESC to CAPTO 4?**** pending w/ factory|Y
01|245683|1|1|Part Number: TBD|Y
01|245683|1|2|Shank for BMT-Turret with D=40/S1=345 Drive TwoFlat|Y
01|245683|1|3|AF 8mm ER25 Output|Y
01|245683|1|4|*External Coolant continuous dryrun possible with|Y
01|245683|1|5|sufficient cooling phase. Max temparature of 90 degrees|Y
01|245683|1|6|celcius to not be exceeded. Reversal of Rotation (drive|Y
01|245683|1|7|direction unequal output direction) L=100mm Gear Ratio|Y
01|245683|1|8|i(n1/n2)=1:1 Max. Coolant Pressure: p(max)=bar(PSI)|Y
01|245683|1|9|Max. Torque: M(max)=25Nm Max. Revolutions: 6500rpm|Y
01|245683|2|1|2 pcs : $9005.00/EA|N
01|245683|2|2|3+ pcs: $7650.00/EA|N
01|245683|2|3|5+ pcs: $6560.00/EA|N
01|245683|2|4|10 pcs: $5745.00/EA|N
01|245683|2|5|Delivery: 12 Weeks ADA|N
01|245683|2|6|Lead time given as ADA - After Signed Drawing Approval.|N
01|245683|2|7|Please allow up to 3 weeks for approval dwg procurement|N
01|245683|7|1|Part Number: TBD|Y
01|245683|7|2|3+ pcs: $7985.00/EA|Y
01|245683|7|3|Shank for BMT-Turret with D=40/S1=345 Drive TwoFlat|Y
01|245683|7|4|AF 8mm ER25 Output Internal Coolant Through Spindle|Y
01|245683|7|5|and External Coolant over pipes. Grade of Filtration:|Y
01|245683|7|6|max. 005mm Continuous Dryrun possible with sufficient|Y
01|245683|7|7|cooling phase Max. Temparature of 90 degrees celsius|Y
01|245683|7|8|must not be exceeded. Reversal of Rotation (Drive|Y
01|245683|7|9|direction unequal output direction) L=100mm|Y
01|245683|7|10|Max. Torque: 25Nm  Max Revolutions: n1(max)=6500rpm|Y
01|245685|1|1|**NET PRICE** Special - non-cancellable non-returnable|Y
01|245685|1|2|Final Part# HSK63A-SM0500-4.724CP  MOQ: 2pcs|Y
01|245685|1|3|HSK63A Shell Mill Holder 1/2|Y
01|245685|1|4|DELIVERY: Please allow 1-2 wks for design plus 10-12|Y
01|245685|1|5|wks for mfg/shipping after customer signs approval|Y
01|245685|1|6|drawing|Y
01|245687|1|1|NBT30-ZDS24-120 - DualContact BT30 Rigid Tap Holder #2.|Y
01|245687|3|1|ZDK24-24 - #2 ZDK24 PositiveDrive Rigid Tap Collet.|Y
01|245687|3|2|Please note this is considered special and has been|Y
01|245687|3|3|quoted at special net price. Once PO/order issued|Y
01|245687|3|4|these cannot be cancelled or returned.|Y
01|245688|8|1|ZQ35-16|Y
01|245688|8|2|Quoted at NET pricing|Y
01|245696|1|1|CAT40-SF16-160MT|Y
01|245696|2|1|CAT40-SF16-160MT|Y
01|245697|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|245698|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|245698|4|1|ADAPTER PLATE FOR SYSTEM 3R WORKHOLDING SYSTEM|Y
01|245725|3|1|Special: Included in price of the purchase of RT.|Y
01|245732|7|1|CUSTOM ANTI-ROTATION POSITIONING BLOCK FOR ANGLE HEAD|Y
01|245732|7|3|THIS ITEM IS A SPECIAL AND IS QUOTED AT A NET PRICE|Y
01|245732|7|4|MAKE SURE TO ADD YOUR MARGIN TO THIS LINE|Y
01|245734|1|1|Replacement for Wrench-ER25I|Y
01|245750|1|1|IT50-SF12-160|Y
01|245755|3|1|*For the 6.5mm|Y
01|245776|5|1|NET PRICE special - non-cancellable non-returnable|Y
01|245776|6|1|NET PRICE special - non-cancellable non-returnable|Y
01|245776|7|1|NET PRICE special - non-cancellable non-returnable|Y
01|245776|7|2|DELIVERY: 1-2 Wks design + 10Wks mfg/shipping after|Y
01|245776|7|3|receipt of signed approval drawing|Y
01|245776|8|1|NET PRICE special - non-cancellable non-returnable|Y
01|245776|8|2|DELIVERY: 1 STOCK BALANCE 1-2 Wks design + 10Wks|Y
01|245776|8|3|mfg/shipping after receipt of signed approval drawing|Y
01|245779|5|1|Riser for P160 Vise - 50mm Height - Air Pass Thru|Y
01|245784|2|1|IT50-C42-95|Y
01|245786|1|1|NBT30-ZDS24-120 - DualContact BT30 Rigid Tap Holder #2.|Y
01|245786|3|1|ZDK24-24 - #2 ZDK24 PositiveDrive Rigid Tap Collet.|Y
01|245786|3|2|Please note this is considered special and has been|Y
01|245786|3|3|quoted at special net price. Once PO/order issued|Y
01|245786|3|4|these cannot be cancelled or returned.|Y
01|245788|1|1|Minimum order quantity of 5 pieces|Y
01|245788|2|1|Minimum order quantity of 5 pieces|Y
01|245789|1|1|FOR M560V P300|Y
01|245789|1|2|CABLES INCLUDED|Y
01|245794|8|1|Oil Chiller with hoses AKZ149-T|Y
01|245795|21|1|Monthly Fee Starting March 19th|Y
01|245795|21|2|2nd Monthy Fee starting July 27th|Y
01|245811|1|1|SP: Coolant Tube (HSK63-TUBE) installed +|Y
01|245811|1|2|Balluff Chip (BIS-C-122-04/L)|Y
01|245812|1|1|PSC C6 hydraulic chuck 20 mm GL/CH MT. 90 *C6-HC20-90*|Y
01|245815|1|1|IT50-EM500-75|Y
01|245815|1|2|SK50 End Mill Holder 1/2|Y
01|245815|4|1|Additional 20% discount applied for our Overstock|Y
01|245815|4|2|Promotion.  Once a Purchase Order has been received|Y
01|245815|4|3|these items cannot be cancelled or returned.|Y
01|245815|6|1|IT50-EM0750-75|Y
01|245815|6|2|SK50 End Mill Holder 3/4|Y
01|245815|9|1|Additional 20% discount applied for our Overstock|Y
01|245815|9|2|Promotion.  Once a Purchase Order has been received|Y
01|245815|9|3|these items cannot be cancelled or returned.|Y
01|245815|11|1|IT50-EM1250-105|Y
01|245815|11|2|SK50 End Mill Holder 1.14|Y
01|245820|1|1|**NET PRICE**|Y
01|245820|1|2|Special - cannot be cancelled or returned upon receipt|Y
01|245820|1|3|of PO|Y
01|245820|2|1|**NET PRICE**|Y
01|245820|2|2|Special - cannot be cancelled or returned upon receipt|Y
01|245820|2|3|of PO|Y
01|245837|1|1|Currently one (1) in stock in Illinois.  Estimated|Y
01|245837|1|2|lead time for the balance is 9~11 weeks.|Y
01|245838|4|1|Please Note: Special: Installation and accessories|Y
01|245838|4|2|are included in the price of the rotary table.|Y
01|245840|1|1|Quoted at NET price.|Y
01|245845|20|1|Part Number: CCK25-22|Y
01|245845|20|2|Straight Coolant Collet/Sleeve OD 25mm ID 22mm|Y
01|245845|20|3|This item is special non-standard stock.  Once a|Y
01|245845|20|4|Purchase Order has been received this item cannot be|Y
01|245845|20|5|cancelled or returned.  Estimated lead time is 15~16|Y
01|245845|20|6|weeks after receipt of an order.|Y
01|245849|8|1|C4001-22-120CP|Y
01|245854|1|1|TRAVEL 5-6 HRS. ONE WAY. OVERNIGHT X 2; 1 DAY WORK|Y
01|245854|1|2|CUSTOMER TO PROVIDE OIL|Y
01|245857|1|1|BMT65-ER32Z Speeder 1:2 for Haas DS30Y|Y
01|245857|23|1|BMT65-ER32X Speeder 1:2 for Haas DS30Y|Y
01|245858|1|1|IT50-SZF25-165|Y
01|245861|2|1|AGED INVENTORY - ONE TIME ONLY PRICE|Y
01|245871|1|1|Additional 5% discount applied to this item for a|Y
01|245871|1|2|quantity break of 10-29 pieces|Y
01|245872|5|1|Part Number: BT50-SLO25-150|Y
01|245872|5|2|BT50 CoolantInducer OilHole FluidHead SideLock 25mm|Y
01|245872|9|1|Part Number: OK25-SK16|Y
01|245872|9|2|SK16 Slim Chuck Collet Oil Hole Holder OD:25mm|Y
01|245872|10|1|Part Number: OK32-SK16|Y
01|245872|10|2|SK16 Slim Chuck Collet Oil Hole Holder OD:32mm|Y
01|245872|11|1|Part Number: OK40-SK16|Y
01|245872|11|2|SK16 Slim Chuck Collet Oil Hole Holder OD:40mm|Y
01|245872|15|1|*Positioning block to be designed and manufactured|Y
01|245872|15|2|upon receipt of spindle drawing. Estimate 1 week lead|Y
01|245872|15|3|time.|Y
01|245888|1|1|APPLICATION NOTES: UNREPAIRABLE TABLE REPLACEMENT|Y
01|245888|1|2|FIELD INSTALLATION REQUIRED BY OTHERS|Y
01|245888|1|3|BUILT TO MATCH SUPPLIED TABLE SPECS|Y
01|245888|1|4|NO CORE CREDIT NO REASSEMBLY OF EXISTING TABLE|Y
01|245888|2|1|REPLACEMENT FOR EXISTING UN-REPAIRABLE 5AX-201|Y
01|245888|2|2|5AX-201BASA-BR2/S1000X1 (R650 CONVERSION)|Y
01|245888|2|3|RN-AX201SD-4+N-A ROTARY JOINT RQR'D|Y
01|245888|6|1|TERMS: 20% DOWN; 80% DUE AT SHIPMENT|Y
01|245888|6|2|SHIPMENT FOB MUNDELEIN IL; LEADTIME 2W FROM DEPOSIT|Y
01|245888|6|3|FINANCING AVAILABLE THROUGH MFR/MFS|Y
01|245891|2|1|Lead time is 3~5 days after design approval.|Y
01|245924|1|1|HSk100A-ER32 Angle Head|Y
01|245931|1|1|NET PRICING|Y
01|245931|1|2|TURN SHANK DOWN TO 1/2 AT LYNDEX-NIKKEN|Y
01|245931|2|1|Net pricing|Y
01|245931|3|1|Net pricing|Y
01|245931|5|1|Net pricing|Y
01|245931|8|1|Net pricing|Y
01|245931|9|1|NET pricing|Y
01|245931|10|1|Net pricing|Y
01|245931|11|1|NET pricing|Y
01|245931|12|1|NET pricing|Y
01|245931|16|1|Quoted at NET Pricing|Y
01|245931|18|1|Quoted at NET pricing|Y
01|245932|1|1|SN:|Y
01|245936|1|1|Base Unit 45677 Makino D500  Base Plate Weight 26kg|Y
01|245936|1|2|5integrated ZP120 clamping pots. Clamping via permanent|Y
01|245936|1|3|spring storagepneumatic release. Dimension D500xH44mm|Y
01|245936|1|4|Lead Time: 10-12weeks|Y
01|245936|1|5|NET Price. SP Order Item. Orders cannot be canceled|Y
01|245936|1|6|after confirmation.|Y
01|245936|2|1|Base Unit 45678 Makino D500  Base Plate weight 38kg|Y
01|245936|2|2|5integrated ZP120 clamping pots. Clamping via permanent|Y
01|245936|2|3|spring storagepneumatic release. Dimension D630xH44mm|Y
01|245936|2|4|Lead Time: 10-12weeks|Y
01|245936|2|5|NET Price. SP Order Item. Orders cannot be canceled|Y
01|245936|2|6|after confirmation.|Y
01|245940|1|1|CAUTION|Y
01|245940|1|2|** No Safety Recess. Body may interfere with ATC Arm **|Y
01|245948|1|1|Price includes Mitsubishi HK-ST352WJ and 8+1RJ|Y
01|245949|1|1|Includes Mitsubishi motors HK-ST352WJ and 12P+1P rotary|Y
01|245949|1|2|union.|Y
01|245950|2|1|NIT50-C32-120G|Y
01|245950|2|2|Non-cancellable/non-returnable|Y
01|245950|3|1|NIT50-C32EX-115|Y
01|245950|3|2|Alternative to NIT50-C32-120G|Y
01|245950|5|1|Part# NIT50-SK10C-105|Y
01|245950|5|2|Dual contact SK50 ISO50 SlimChuck SK10 105 gauge length|Y
01|245950|6|1|Part# NIT50-SK10C-135|Y
01|245950|6|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|245950|7|1|NIT50-SK10C-165|Y
01|245950|8|1|Part# NIT50-SK16C-105|Y
01|245950|8|2|Dual contact SK50 ISO50 SlimChuck SK16 105 gauge length|Y
01|245950|9|1|Part# NIT50-SK16C-135|Y
01|245950|9|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|245950|48|1|NIT50-SK25C-135|Y
01|245950|49|1|NIT50-SK25C-165|Y
01|245950|58|1|NIT50-SK16C-165|Y
01|245950|59|1|IT50-FMA25.4-90|Y
01|245955|1|1|NIT50-SK10C-105|Y
01|245955|1|2|Dual contact SK50 ISO50 SlimChuck SK10 105 gauge length|Y
01|245955|2|1|NIT50-SK10C-135|Y
01|245955|2|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|245955|3|1|NIT50-SK10C-165|Y
01|245955|3|2|Dual contact SK50 ISO50 SlimChuck SK10 165 gauge length|Y
01|245955|4|1|NIT50-SK16C-105|Y
01|245955|4|2|Dual contact SK50 ISO50 SlimChuck SK16 105 gauge length|Y
01|245955|5|1|NIT50-SK16C-135|Y
01|245955|5|2|Dual contact SK50 ISO50 SlimChuck SK16 135 gauge length|Y
01|245955|6|1|NIT50-SK16C-165|Y
01|245955|6|2|Dual contact SK50 ISO50 SlimChuck SK16 165 gauge length|Y
01|245955|11|1|Part# NIT50-SK10C-135|Y
01|245955|11|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|245955|12|1|NIT50-SK10C-165|Y
01|245955|13|1|Part# NIT50-SK16C-105|Y
01|245955|13|2|Dual contact SK50 ISO50 SlimChuck SK16 105 gauge length|Y
01|245955|14|1|Part# NIT50-SK16C-135|Y
01|245955|14|2|Dual contact SK50 ISO50 SlimChuck SK10 135 gauge length|Y
01|245971|1|1|Final Part# H50A-SF12-90CP **NET PRICE**|Y
01|245971|1|2|HSK50A Shrink Fit Holder 12mm 25K GL90mm w/ CP|Y
01|245971|2|1|Final Part# H50A-SF6-80CP **NET PRICE**|Y
01|245971|2|2|HSK50A Shrink Fit Holder 6mm 25K GL80mm w/ CP|Y
01|245971|3|1|Final Part# H50A-SF4-60 **NET PRICE**|Y
01|245971|3|2|HSK50A Shrink Fit Holder 4mm 25K|Y
01|245971|3|3|DELIVERY: 2 Wks design + 10wks mfg/shipping after|Y
01|245971|3|4|receipt of signed approval drawing|Y
01|245971|4|1|Final Part# H50A-SF3-60 **NET PRICE**|Y
01|245971|4|2|HSK50A Shrink Fit Holder 3mm 25K|Y
01|245971|4|3|DELIVERY: 2 Wks design + 10wks mfg/shipping after|Y
01|245971|4|4|receipt of signed approval drawing|Y
01|245971|5|1|Final Part# H50A-SF12-120CP **NET PRICE**|Y
01|245971|5|2|HSK50A Shrink Fit Holder 12mm 25K GL120mm w/ CP|Y
01|245971|5|3|DELIVERY: 2 Wks design + 10wks mfg/shipping after|Y
01|245971|5|4|receipt of signed approval drawing|Y
01|245971|6|1|Final Part# H50A-SF6-120 **NET PRICE**|Y
01|245971|6|2|HSK50A Shrink Fit Holder 6mm 25K GL120mm w/ CP|Y
01|245971|6|3|DELIVERY: 2 Wks design + 10wks mfg/shipping after|Y
01|245971|6|4|receipt of signed approval drawing.|Y
01|245971|7|1|Final Part# H50A-SF4-120 **NET PRICE**|Y
01|245971|7|2|HSK50A Shrink Fit Holder 4mm 25K|Y
01|245971|7|3|DELIVERY: 2 Wks design + 10wks mfg/shipping after|Y
01|245971|7|4|receipt of signed approval drawing.|Y
01|245971|8|1|Final Part# H50A-SF3-120 **NET PRICE**|Y
01|245971|8|2|HSK50A Shrink Fit Holder 3mm 25K|Y
01|245971|8|3|DELIVERY: 2 Wks design + 10wks mfg/shipping after|Y
01|245971|8|4|receipt of signed approval drawing.|Y
01|245971|10|1|Non-cancellable non-returnable after receipt of PO|Y
01|245971|10|2|**Must ship via freight**|Y
01|245973|5|1|Please note these are non-standard stock and considered|Y
01|245973|5|2|special. Once PO/order issued these can't be cancelled|Y
01|245973|5|3|or returned.|Y
01|245980|1|1|APPLICATION: WIA KF6; FANUC Oi-MF+; RIGHT SIDE MNT|Y
01|245984|1|1|APPLICATION: WIA KF7700B  WITH SIEMENS 828D|Y
01|245984|1|2|E-PLAN WITH MOTOR SPECS REQUIRED AT TIME OF ORDER.|Y
01|245984|1|3|LEADTIME UNKNOWN DUE TO MOTOR SPECS. BASE TABLE|Y
01|245984|1|4|W/O MOTOR IS STOCKED LOCALLY.|Y
01|245984|1|5|INSTALLATION BY OTHERS.|Y
01|245984|2|1|CNC260PLZA-M|Y
01|245984|2|2|BUILDER TO SUPPLY DRIVES PLC & COMMISSIONING...|Y
01|245984|2|3|INSTRUCTIONS.  INSTALLATION BY OTHERS|Y
01|245984|2|4|PNEUMATIC BRAKE|Y
01|245984|2|5|E-PLAN REQUIRED AT TIME OF ORDER|Y
01|245987|21|1|Please note this is non-standard stock and considered|Y
01|245987|21|2|special. Once PO/order issued these can't be cancelled|Y
01|245987|21|3|or returned.|Y
01|245987|22|1|Please note this is non-standard stock and considered|Y
01|245987|22|2|special. Once PO/order issued these can't be cancelled|Y
01|245987|22|3|or returned.|Y
01|245987|23|1|Please note this is non-standard stock and considered|Y
01|245987|23|2|special. Once PO/order issued these can't be cancelled|Y
01|245987|23|3|or returned.|Y
01|245987|24|1|Please note this is non-standard stock and considered|Y
01|245987|24|2|special. Once PO/order issued these can't be cancelled|Y
01|245987|24|3|or returned.|Y
01|245987|25|1|Please note this is non-standard stock and considered|Y
01|245987|25|2|special. Once PO/order issued these can't be cancelled|Y
01|245987|25|3|or returned.|Y
01|245988|1|1|Muratec MD-200 ER32 Offset Live Tool|Y
01|245988|1|2|Offset Live Tool per customers drawing.|Y
01|245988|1|3|Quoted at Net price for 1~2 tools.|Y
01|245988|2|1|Muratec MD-200 ER32 Offset Live Tool|Y
01|245988|2|2|Offset Live Tool per customers drawing.|Y
01|245988|2|3|Quoted at Net price.|Y
01|245988|3|1|Muratec MD-200 ER32 Offset Live Tool|Y
01|245988|3|2|Offset Live Tool per customers drawing.|Y
01|245988|3|3|Quoted at Net price.|Y
01|246001|3|1|TILT AND ROTARY AXIS HEIDENHAIN SCALES|Y
01|246003|6|1|MARTIN TRUNNION L-N CNC202 SHELF S1 UNIT...|Y
01|246003|6|2|PREPPED WITH CENTER LOCATING BOSS P80Z MOUNTING|Y
01|246003|6|3|PATTERN.|Y
01|246003|6|4|NET COST = 2040.00; QT#9607|N
01|246022|1|1|Additional 20% Overstock Promo discount applied|Y
01|246022|1|2|**Non-cancellable non-returnable**|Y
01|246024|1|1|SN:6293 CNC501TFA10+1 EU:Honda|Y
01|246024|1|2|RGA#TAR-62700|Y
01|246024|28|1|F & S Recondition Rotary Joint|Y
01|246025|2|1|SN:xxxx  CNC400HFA-6P+3P EU:Honda|Y
01|246025|2|2|RGA#TAR-62698|Y
01|246025|24|1|F&S Recondition Rotary Joint|Y
01|246028|3|1|We currently have six (6) in stock in Illinois with|Y
01|246028|3|2|another eleven (11) due in mid/end April.  The balance|Y
01|246028|3|3|will take 12~14 weeks after receipt of an order.|Y
01|246030|2|1|Additional 20% discount applied for Overstock|Y
01|246030|2|2|Promotion.  Once a Purchase Order has been received|Y
01|246030|2|3|this item cannot be cancelled or returned.|Y
01|246042|1|1|**NET PRICE** Special- cannot be cancelled or returned|Y
01|246042|1|2|after receipt of PO|Y
01|246056|1|1|SN:25062T EU:Light Metals Corp|Y
01|246056|1|2|RGA#TAR-62711 CNCZ180LSA-BR2|Y
01|246057|6|1|Quoted at NET price.|Y
01|246057|7|1|Quoted at NET price.|Y
01|246072|1|1|APPLICATION: ENSHU GE30V FANUC 31i-MB|Y
01|246072|1|2|REPLACING EXISTING TSUDAKOMA TABLE.  REUSE DRIVE|Y
01|246072|1|3|CUSTOMER TO INSTALL.|Y
01|246072|1|4|INSTALLATION QUOTED AS OPTION.|Y
01|246072|1|5|AIR FREIGHT AVAILABLE FOR ADDITIONAL COST.|Y
01|246072|4|1|INSTALLATION LABOR MOTOR AND FEEDBACK CABLES ONLY.|Y
01|246072|4|2|REUSE EXISTING DRIVE.|Y
01|246072|4|3|ALL TRAVEL EXPENSES INCLUDED IN THIS COST.|Y
01|246078|1|1|Currently 20 in stock in Illinois estimated lead time|Y
01|246078|1|2|for the balance is 20~22 weeks after receipt of an|Y
01|246078|1|3|order.|Y
01|246086|1|1|**non-cancellable non-returnable**|Y
01|246086|2|1|**non-cancellable non-returnable**|Y
01|246086|3|1|**NET PRICE**|Y
01|246086|3|2|**non-cancellable non-returnable**|Y
01|246089|2|1|Lead time is 3~5 days after design approval.|Y
01|246090|5|1|A tariff surcharge may be added to this quotation in|Y
01|246090|5|2|the event of a sustained tariff increase on the|Y
01|246090|5|3|importation of this product.  Any surcharge will be|Y
01|246090|5|4|disclosed prior to acceptance of an order.|Y
01|246102|1|1|SN:3828 EU:XXX|Y
01|246102|1|2|RGA#TAR-62726 5AX-350|Y
01|246103|1|1|CNC400HFA 6+3P|Y
01|246103|1|2|Matching serial #6007 (assumed)|Y
01|246103|1|3|This is a tentative estimate and may be readjusted|Y
01|246103|1|4|after RT inspection at our facility|Y
01|246103|1|5|This estimate is at Net Pricing|Y
01|246104|1|1|CNC400HFA-6+3. Serial# is missed from the RT.|Y
01|246104|1|2|Overhaul/Repair including replacement of consumable|Y
01|246104|1|3|parts Worm Wheel Worm Screw/Shaft Assy|Y
01|246104|1|4|Recondition RJ Labor hours.|Y
01|246104|1|5|Pricing is Net price|Y
01|246108|1|1|CNCZ302TFA-8+1PRJ (Ref. SN 6812)|Y
01|246108|1|2|RTable HiSpeed 300mm AirBrake Fanuc TopMT 8pRJ w/o Mtr|Y
01|246108|1|3|Lead time: 3.0mo mfg + Ship(Boat 1.5mo)|Y
01|246108|1|4|NET Price. SP Order Item. Orders cannot be canceled|Y
01|246108|1|5|after confirmation.|Y
01|246115|1|1|CNC501TFA-10+1. Serial#6293.|Y
01|246115|1|2|Overhaul/Repair including replacement of consumable|Y
01|246115|1|3|parts Worm Wheel Recondition RJ Labor hours.|Y
01|246115|1|4|*Worm Screw/Shaft Assy is not replaced for this time|Y
01|246115|1|5|since the existing one is still re-useable.|Y
01|246115|1|6|Pricing is Net price|Y
01|246135|1|1|CNC400HFA-6+? Serial#6092|Y
01|246135|1|2|Overhaul/Repair including xxxxxxxxxxxxxxxxxxxxxxxxxxx|Y
01|246135|1|3|xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx|Y
01|246135|1|4|xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx.|Y
01|246135|1|5|Pricing is Net price.|Y
01|246135|1|6|Estimated at this time price may change at the time of|Y
01|246135|1|7|repair works.|Y
01|246142|1|1|10PC INCH SET FROM 3/32-3/8 32nd INC.|Y
01|246142|1|2|EQUIV TECH 04209IS|N
01|246142|1|3|MADE IN JAPAN|Y
01|246142|2|1|ER32 COLLET SET 18PC 7/32-3/4 32nd INC.|Y
01|246142|2|2|EQUIV TECH#04212IS|N
01|246142|2|3|MADE IN JAPAN|Y
01|246160|1|1|For H80FRAM-ER16-206ST S#1023430/Wm F Hurst|Y
01|246166|1|1|Table without motor.|Y
01|246184|1|1|Currently three (3) in stock in Illinois w/ another|Y
01|246184|1|2|three (3) at the factory.|Y
01|246184|3|1|Currently one (1) in stock in Illinois.  Estimated lead|Y
01|246184|3|2|time for the balance of two (2) is approximately 3~4|Y
01|246184|3|3|weeks as we have stock at the factory.|Y
01|246184|10|1|Currently one (1) in stock in Illinois.  We have|Y
01|246184|10|2|more stock coming in around early April.|Y
01|246193|1|1|RGA#CUR-62752/|Y
01|246193|1|2|Repair of MRAM-ER11ST SN:22900875 (Mim#162716)|Y
01|246193|2|1|Bearings seals o-rings damaged bevel gears|Y
01|246193|2|2|intermediate spindle and ER11 spindle to be replaced|Y
01|246223|1|1|P/N: TBD   HSK100A-HC1000-240|Y
01|246223|1|2|HSK100A taper 1 ID bore and gauge length 240mm|Y
01|246228|3|1|Quoted at Net price.|Y
01|246238|7|1|This item is special non-standard stock.  Once a|Y
01|246238|7|2|Purchase Order has been received this item cannot be|Y
01|246238|7|3|cancelled or returned.|Y
01|246238|7|4|MOQ = 2 pieces|Y
01|246243|1|1|Special Axial Flex tool for Nakamura D44 S1=91 I.C.E.|Y
01|246243|1|2|6000 RPM ratio 1:1|Y
01|246253|1|1|Currently one (1) in stock in Illinois.  The balance|Y
01|246253|1|2|of two (2) lead time is end of March/early April.|Y
01|246253|3|1|Currently four (4) in stock in Illinois.|Y
01|246253|5|1|Currently two (2) in stock in Illinois.  Estimated|Y
01|246253|5|2|lead time for balance of one (1) is 13~15 weeks after|Y
01|246253|5|3|receipt of an order.|Y
01|246279|2|1|20% OVERSTOCK Promotion applied.|Y
01|246279|2|2|This item cannot be returned.|Y
01|246291|1|1|Match w/SN#6017|Y
01|246291|1|2|Pricing is Net Price|Y
01|246292|1|1|Match w/SN#6017|Y
01|246292|1|2|Pricing is Net Price|Y
01|246296|1|1|Leadtime is 16-18 weeks|Y
01|246298|1|1|Part Number: SRS-6.2F|Y
01|246302|1|1|Lead time: 5.5mo (3.5mo mfg + Ship by boat 1.5-2.0mo)|Y
01|246302|1|2|NET Price. SP Order Item. Orders cannot be canceled|Y
01|246302|1|3|after confirmation.|Y
01|246302|1|4|REF: SN 3184|Y
01|246304|1|1|Part Number: HSK63T-SLT32-115|Y
01|246304|1|2|HSK63T 32mm IntTurn Round Tooling Holder|Y
01|246305|1|1|Currently 17 in stock in Illinois.  Estimated lead time|Y
01|246305|1|2|for the balance is 6~8 weeks after receipt of an order.|Y
01|246305|2|1|Currently 7 in stock in Illinois.  Estimated lead time|Y
01|246305|2|2|for the balance is 6~8 weeks after receipt of an order.|Y
01|246305|3|1|No stock in Illinois.  Estimated lead time is 6~8 weeks|Y
01|246305|3|2|after receipt of an order.|Y
01|246305|4|1|8 weeks lead time after receipt of an order.|Y
01|246308|1|1|Match w/SN#6017|Y
01|246308|1|2|Honda/OKK color (Green)|Y
01|246308|1|3|Pricing is Net Price|Y
01|246316|1|1|APPLICATION NOTES:|Y
01|246316|1|2|FOR DNM5700L S#MV0151000299 Oi-MF+|Y
01|246316|1|3|RIGHT SIDE TABLE INSTALLATION|Y
01|246316|2|1|USED TABLE SN: 6671|Y
01|246316|2|2|PRICE INCLUDES ADDING ON MOTORS|Y
01|246316|2|3|ALL USED CARRIES STANDARD CONDITIONAL WARRANTY|Y
01|246316|2|4|TABLE IS PREPPED AND COMPLETES SAME RIGOROUS PRE-|Y
01|246316|2|5|SHIPMENT QUALITY CHECKS. PERFORMANCE MEETS NEW|Y
01|246316|2|6|PRODUCTION FUNCTION|Y
01|246316|7|1|SET OF 4 LOCATION KEYS FOR M120S TO 5AX-201 TABLE|Y
01|246316|7|2|SEE TIM REEVES|Y
01|246319|4|1|MNL12-C5X-ICE-8K with Eltimon|Y
01|246319|4|2|Quoted at NET pricing|Y
01|246319|4|3|Non-cancellableNon-returnable|Y
01|246319|4|4|Allow 2 weeks for approval drawingthen 9-10 weeks MFG|Y
01|246319|4|5|after receipt of signed approval drawing.2 wks shipping|Y
01|246349|1|1|Part Number: TBD|Y
01|246349|1|2|Mimatic Part#: 191188|Y
01|246349|1|3|Delivery:|Y
01|246349|1|4|1 pc 2 Weeks Additional pcs: 4-5 Weeks|Y
01|246359|1|1|A202280_00061911_A4_Massblatt BMT40|Y
01|246359|2|1|A202280_00061911_A4_Massblatt BMT60|Y
01|246363|1|1|CAT40-HC20-4.00|Y
01|246363|1|2|CAT40 Hydraulic Chuck 20mm X 4.00 Gage Length 12K RPM|Y
01|246363|1|3|Minimum Quantity 3-Pcs.|Y
01|246364|2|1|Questionnaire will need to be completed.|Y
01|246397|1|1|9 pieces stock at Nikken ETA 1-2wks|Y
01|246397|1|2|bal 3.5~4 mths mfg plus 1-2wks shipping|Y
01|246405|2|1|DELIVERY: 1 STOCK 2 pcs ETA 3/16 Bal ETA 6/1|Y
01|246406|1|1|Net price includes the following parts for assembly|Y
01|246406|1|2|at Lyndex-Nikken: HSK63-TubeSKN-6WKJ(GH) SKG6-6HG-J|Y
01|246406|1|3|customer's supplied RFID chip and holder re-balanced.|Y
01|246406|2|1|Net price includes the following parts for assembly|Y
01|246406|2|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|246406|2|3|customer's supplied RFID chip and holder re-balanced.|Y
01|246406|3|1|Net price includes the following parts for assembly|Y
01|246406|3|2|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|246406|3|3|and customers RFID chips. Holders to be re-balanced.|Y
01|246406|4|1|Net price include the following parts for assembly|Y
01|246406|4|2|at Lyndex-Nikken: HSK63-Tube and customer's supplied|Y
01|246406|4|3|RFID chip and holder re-balanced.|Y
01|246412|1|1|HSK63A-MDSK13-135|Y
01|246418|1|1|Country of Origin:  Japan|Y
01|246418|2|1|Country of Origin:  Croatia|Y
01|246423|2|1|P/N: TDE3606-28|Y
01|246427|2|1|BT30-FMB25.4-45|Y
01|246427|3|1|BT50-FMH27-60-45|Y
01|246429|9|1|DELIVERY: 1 STOCK 4 PCS 3 Weeks BALANCE 1 PC 4-5Wks|Y
01|246432|1|1|CAT50-SF0750-5.12CPDIN-M|Y
01|246432|1|2|CAT50 Shrink Fit Holder 3/4 CoolantPorts 25K|Y
01|246432|1|3|DIN modified 4 holes with back-up screw|Y
01|246432|2|1|CAT50-SF1000-3.94CPDIN-M|Y
01|246432|2|2|CAT50 Shrink Fit Holder 1 CoolantPorts 25K|Y
01|246432|2|3|DIN modified 4 holes with back-up screw|Y
01|246432|3|1|Quoted at NET price.|Y
01|246439|1|1|NET PRICING|Y
01|246443|1|1|SN: 8124  5AX-2MT-105-120SA3|Y
01|246443|1|2|Machine: Brother Model:TC-32A SN: 111821|Y
01|246443|1|3|EU:Senior Flexonics  Service Call on 3/3/2026|Y
01|246443|1|4|Travel and Labor Time for Service Call|Y
01|246462|1|1|NCAT40 DualContact Blank Bar 3 dia x 8.00 GL|Y
01|246462|1|2|Final Part# TBD **NET PRICE**|Y
01|246462|1|3|Non-cancellable non-returnable|Y
01|246462|1|4|QTY BREAK PRICING:|Y
01|246462|1|5|2pcs: $404.00 ea/NET|Y
01|246462|1|6|5pcs: $378.00 ea/NET|Y
01|246462|1|7|10pcs:$360.00 ea/NET|Y
01|246462|1|8|.|Y
01|246462|1|9|DELIVERY: Allow 1-2 weeks design time plus ~12 weeks|Y
01|246462|1|10|for mfg/shipping after receipt of signed approval dwg|Y
01|246472|1|1|Final Part# HSK100A-C25-135 **NET PRICE**|Y
01|246472|1|2|HSK100A 25mm Milling Chuck 135mm GL|Y
01|246472|1|3|Special non-standard stock - cannot be cancelled or|Y
01|246472|1|4|returned|Y
01|246472|2|1|Final Part# HSK100A-C25-165 **NET PRICE**|Y
01|246472|2|2|HSK100A 25mm Milling Chuck 165mm GL|Y
01|246472|2|3|Special non-standard stock - cannot be cancelled or|Y
01|246472|2|4|returned|Y
01|246490|1|1|Additional 20% Overstock Discount applied - cannot|Y
01|246490|1|2|be cancelled or returned|Y
01|246505|1|1|OPTION A|Y
01|246505|7|1|OPTION B|Y
01|246505|8|1|SPECIAL ORDERED: REMOVE TSC FEATURE DRY OPERATION|Y
01|246505|8|2|3000 rpm MAX.|Y
01|246505|8|3|WEIGHT = 81LBS.|Y
01|246505|8|4|LIST= $39875  DISCOUNTED 20%|Y
01|246505|8|5|BEAST|Y
01|246505|9|1|REQUIRED. FOR SHARP VMC SVG-8540A|Y
01|246508|6|1|Approval drawing required.|Y
01|246510|5|1|PRESETTER INSTALLATION & TRAINING ONLY|Y
01|246510|5|2|FLETCHER POLAND WILL INSTALL PRESETTER AT NO COST|Y
01|246510|12|1|INSTALLATION & TRAINING FOR 1 TID INSTALLATION.|Y
01|246510|12|2|INSTALLATION MUST BE DONE AT THE SAME TIME AS|Y
01|246510|12|3|PRESETTER TRAINING.|Y
01|246510|12|4|ERIC HARTMAN WILL PERFORM TID INSTALLATION|Y
01|246513|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS ON|Y
01|246513|5|2|OKUMA M660V VMC.|Y
01|246528|2|1|Customer sending in probe|Y
01|246541|1|1|Req.INS/Black Oxide Issue/For Stock|Y
01|246541|2|1|Req.INS/OD Groove frange Dia issue/S#1028831/Repeat|Y
01|246541|3|1|Req.INS/OD Groove frange Dia issue/S#1028831/Repeat|Y
01|246541|4|1|Req.INS/OD Groove frange Dia issue (6)S#1028831|Y
01|246541|5|1|1st Batch/Install (2)S3/4-16X11/16 S#1029543 Liberty T|Y
01|246541|6|1|1st Batch/S#1032832 3/2/26:DWG APPROVED/Customer|Y
01|246544|1|1|RGA#LVR-62779/|Y
01|246544|1|2|Repair of MNL12-ER32Z-ICE-10K SN:9890102 (Mim#101523)|Y
01|246544|2|1|Bearings seals and o-rings to be replaced|Y
01|246556|1|1|Discount reflects a purchase of 1 or 2 tables.|Y
01|246563|1|1|Part Number: TBD|Y
01|246563|1|2|BMT55 1:3 Speeder ER16 Output|Y
01|246563|1|3|External Coolant Supply over coolant pipe output is|Y
01|246563|1|4|reversal to input L=105mm offset 13mm|Y
01|246563|1|5|Gear Ratio: i(n1/n2)=1:3 max. coolant pressure|Y
01|246563|1|6|p(max)=70 Bar Max. Torque M(max)=5Nm per spindle|Y
01|246563|1|7|Max. Ingoing Revolution n1(max)=6000rpm|Y
01|246563|1|8|Delivery: 15-17 Weeks ADA Drawing Procurement: 4 Weeks|Y
01|246563|1|9|*Lead time given as ADA - After Signed Drawing Approval|Y
01|246563|1|10|Please allow 4 weeks for procurement of approval dwg|Y
01|246564|1|1|CAT50 40mm Shell Mill Holder 100mm GL - C5001-40-100CP|Y
01|246570|1|1|SN:8124 EU:XXXX|Y
01|246570|1|2|RGA#TAR-62757 5AX-2MT-105-120 SA3|Y
01|246570|2|1|Repair declined returning disassembled.|Y
01|246583|1|1|*To be installed w/ PS-123E @ Factory|Y
01|246583|2|1|*To be installed w/ NC5-46-SK6C-90 @ Factory|Y
01|246588|1|1|WR RPLC for DEF(FN).|Y
01|246588|1|2|3/5RY:4/20B LY-2853/NCV|Y
01|246592|1|1|Currently no stock.  Estimated lead time is end of|Y
01|246592|1|2|March.|Y
01|246594|1|1|1st batch|N
01|246594|2|1|1st batch|N
01|246596|1|1|Please Note: This promo kit is at Spektrum Machining|Y
01|246596|1|2|If they decide to purchase the kit we will need a PO|Y
01|246596|1|3|with Billing Purposes Only noted.|Y
01|246596|1|4|Extra 10% added to the discount for this item only.|Y
01|246609|3|1|Includes hoses and fittings.|Y
01|246612|1|1|Estimated lead time is mid/end July.|Y
01|246615|1|1|Set up for Mitsubishi motor|Y
01|246616|1|1|**non-cancellable non-returnable**|Y
01|246628|1|1|Discontinued - non-cancellable non-returnable|Y
01|246633|1|1|Additional 20% discount applied for our Overstock|Y
01|246633|1|2|Promotion.  Once a Purchase Order is received this|Y
01|246633|1|3|item cannot be cancelled or returned.|Y
01|246637|1|1|Currently one (1) in stock in Illinois.  Estimated lead|Y
01|246637|1|2|time for balance is Early/Mid May.|Y
01|246640|1|1|SN:2057 EU:Huron Tool & Cutter Grinding|Y
01|246640|1|2|RGA#TAR-62771 5AX-100YA-M|Y
01|246640|20|1|Crate for 5AX-100YA-M both are same size|Y
01|246643|1|1|Additional 20% has been applied for our Overstock|Y
01|246643|1|2|Promotion.  Once a Purchase Order has been received|Y
01|246643|1|3|this cannot be cancelled or returned.|Y
01|246651|1|1|P/N: QCFC42-080-SMO-SP    SAMPLE|Y
01|246651|1|2|with carbide surface treatment for improved gripping.|Y
01|246659|1|1|P/N: H80A-MRAM|Y
01|246659|1|2|Modular AngleHead Taper HSK80A w/o Positioning Arm|Y
01|246676|1|1|1st Batch(after sample approval)|Y
01|246676|2|1|1st Batch/S#1026483/Hoffmann/1X Technologies|Y
01|246676|3|1|1st Batch/S#1026844/DGI|Y
01|246676|4|1|1st Batch T/P Inspection Required|Y
01|246692|1|1|ZKN38-1P|Y
01|246692|1|2|ZKG38 TorqueControl Tap Collet PIPE|Y
01|246696|1|1|RGA#LVR-62742/|Y
01|246696|1|2|Custonemr declined repair of MZL60-ER32(X) SN:3881501|Y
01|246696|1|3|(Mim#176581)|Y
01|246696|2|1|Customer is purchasing replacement. Return requested.|Y
01|246696|2|2|Inspection fee has been waived.|Y
01|246698|1|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|246698|2|1|Req.INS/Black Oxide Issue/For Stock|Y
01|246698|3|1|Req.INS/Install S9/16-18X1/2|Y
01|246698|4|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|246698|5|1|Req.INS/OD Groove frange Dia issue|Y
01|246698|6|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|246698|7|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|246698|8|1|Req.INS/OD Groove frange Dia issue|Y
01|246699|1|1|Match w/YM9534009C. Drawing#TCA-59049|Y
01|246699|1|2|Honda/OKK color (Green)|Y
01|246699|1|3|Pricing is Net Price|Y
01|246699|1|4|4.5 - 5 Months Manufacturing in Japan + ship to USA|Y
01|246701|1|1|Discount reflects a purchase order of 1~2 tools.|Y
01|246701|2|1|Discount reflects a purchase order of 3~5 tools.|Y
01|246727|1|1|1 pc QTY BREAK PRICING|Y
01|246727|2|1|2-5 PCS QTY BREAK PRICING|Y
01|246727|3|1|6-10 pcs QTY BREAK PRICING|Y
01|246727|4|1|11-15pcs QTY BREAK PRICING|Y
01|246727|5|1|16-20 pcs QTY BREAK PRICING|Y
01|246731|1|1|Positioning block for Haas VF-8 & C40-MRAM. These are|Y
01|246731|1|2|non-standard stock and considered special. This will be|Y
01|246731|1|3|designed and manufactured per confirmation of spindle.|Y
01|246735|9|1|Quoted at NET price delivery for the positioning|Y
01|246735|9|2|block will be quoted after the angle head has shipped|Y
01|246735|9|3|and the end user has given our engineers the|Y
01|246735|9|4|dimensions to make the block.|Y
01|246736|1|1|Part Number: TBD|Y
01|246736|1|2|CAT50 End Mill Holder 1.1/4 12 G/l|Y
01|246737|1|1|BMT85-C6X-ICE - BMT85 Live PSC C6 X<Radial>STRT|Y
01|246737|1|2|IntExtCoolant.|Y
01|246737|1|4|Running on a DN Solutions PV 9300M.|Y
01|246738|5|1|Delv = 8pcs 2 weeks & balance = mid-June|Y
01|246739|2|1|Quoted at NET PRICING.|Y
01|246739|2|2|Non-returnable/Non-cancelable|Y
01|246754|1|1|1st Batch(after sample approval)|Y
01|246754|2|1|1st Batch(after sample approval)|Y
01|246754|3|1|T/P Inspection Required|Y
01|246754|4|1|T/P Inspection Required|Y
01|246754|5|1|T/P Inspection Required|Y
01|246756|1|1|SN:6760 EU:Jedco Inc|Y
01|246756|1|2|RGA#TAR-62770 CNC401FA-M|Y
01|246756|1|3|Repair Declined|Y
01|246766|2|1|IT40-SK16-120|Y
01|246766|2|2|NET pricing|Y
01|246766|4|1|IT40-SK10-120|Y
01|246766|4|2|NET pricing|Y
01|246779|4|1|**Only available coolant sealed**|Y
01|246790|1|1|SN:28144T EU:Waukesha Machine Tool|Y
01|246790|1|2|RGA#TAR-62776 CNCZ180LAA21-400W|Y
01|246804|1|1|Currently one (1) in stock in Illinois.  The balance|Y
01|246804|1|2|of two (2) lead time is end of March/early April.|Y
01|246804|3|1|Currently four (4) in stock in Illinois.|Y
01|246804|5|1|Currently two (2) in stock in Illinois.  Estimated|Y
01|246804|5|2|lead time for balance of one (1) is 13~15 weeks after|Y
01|246804|5|3|receipt of an order.|Y
01|246815|1|1|SN:xxxx CNCxxx EU:xxxx|Y
01|246815|1|2|MC:xxxx Model:xxxx|Y
01|246815|1|3|Installer:xxx Date:mm/dd/yr|Y
01|246828|1|1|MSC SKU: 38180865|Y
01|246828|2|1|MSC SKU: 40114381|Y
01|246828|3|1|MSC SKU: 38181459|Y
01|246828|4|1|MSC SKU: 80653025|Y
01|246828|5|1|MSC SKU: 67923888|Y
01|246828|6|1|MSC SKU: 67919845|Y
01|246828|7|1|MSC SKU: 80658610|Y
01|246828|8|1|MSC SKU:29320447|Y
01|246829|2|1|hold 13/64|Y
01|246829|14|1|holds 8.5mm|Y
01|246829|16|1|holds 6.5mm|Y
01|246829|23|1|holds 31/64|Y
01|246829|25|1|holds 13/16 and 20.5mm|Y
01|246836|5|1|Please note these are non-standard stock and considered|Y
01|246836|5|2|special. Once PO/order issued these can't be cancelled|Y
01|246836|5|3|or returned.|Y
01|246837|1|1|P/N: H80A-MRAM|Y
01|246837|1|2|Modular AngleHead Taper HSK80A w/o Positioning Arm|Y
01|246837|6|1|P/N: CN-01|Y
01|246837|6|2|NSK Nakanishi Extension|Y
01|246838|1|1|P/N: H80A-MRAM|Y
01|246838|1|2|Modular AngleHead Taper HSK80A w/o Positioning Arm|Y
01|246838|6|1|P/N: CN-01|Y
01|246838|6|2|NSK Nakanishi Extension|Y
01|246852|1|1|**NET PRICE**  Special - cannot be cancelled/returned|Y
01|246852|1|2|Mimatic A197598|Y
01|246852|1|3|BMT45 PSC C3 Live Tool 90deg CH 65|Y
01|246854|2|1|ADAPTER PLATE FOR ZERO CLAMP P100 PNEUMATIC VISE|Y
01|246854|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|246854|6|1|FULL ROTARY TABLE INSTALLATION|Y
01|246854|6|2|TILTED WORKPLACE OPTION MUST BE INSTALLED BY|Y
01|246854|6|3|ELLISON TECHNOLOGIES SERVICE TECHNICIAN|Y
01|246855|4|1|LOCATION KEY AND INSTALLATION HARDWARE KIT FOR|Y
01|246855|4|2|M120S MANUAL SELF-CENTERING VISE|Y
01|246855|4|3|ALLOWS VISE TO BE INSTALLED ON 5AX-201 ROTARY TABLE|Y
01|246855|5|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|246855|6|1|FULL ROTARY TABLE INSTALLATION|Y
01|246855|6|2|TILTED WORKPLANE OPTION MUST BE INSTALLED BY|Y
01|246855|6|3|ELLISON TECHNOLOGIES SERVICE TECHNICIAN|Y
01|246857|1|1|SK50-SK10-105U-1DU|Y
01|246857|2|1|SK50-SK10-195U-1DU|Y
01|246857|3|1|SK50-SK16-105U-1DU|Y
01|246857|4|1|SK50-SK16-195U-1DU|Y
01|246857|5|1|SK50-SK25-105U-1DU|Y
01|246857|6|1|SK50-SK25-195U-1DU|Y
01|246872|2|1|Additional 20% discount applied for our Overstock|Y
01|246872|2|2|Promotion. Once a Purchase Order has been received|Y
01|246872|2|3|this item cannot be cancelled or returned.|Y
01|246882|1|1|Final Part# TBD **NET PRICE**|Y
01|246882|1|2|C8 AngleHead ER32 Flex IntExtCoolant7MP 110mm Pitch|Y
01|246882|1|3|Custom Special - cannot be cancelled or returned|Y
01|246882|1|4|.|Y
01|246882|1|5|QTY BREAK NET PRICING:|Y
01|246882|1|6|1 pc: $26634.00 ea/NET|Y
01|246882|1|7|2pcs: $21312.00 ea/NET|Y
01|246882|1|8|.|Y
01|246882|1|9|DELIVERY: 3 Wks Design + 12 Wks mfg/shipping after|Y
01|246882|1|10|receipt of signed approval drawing|Y
01|246882|2|1|LN to make block after receipt of spindle specs|Y
01|246882|2|2|necessary for design|Y
01|246882|2|3|**non-cancellable non-returnable**|Y
01|246889|1|1|Net price includes the following parts for assembly|Y
01|246889|1|2|at Lyndex-Nikken: HSK63-Tube SKN-6WKJ(GH) SKG6-6HG-J|Y
01|246889|1|3|and customers RFID chip. Holders will be re-balanced.|Y
01|246889|2|1|Net price includes the following parts for assembly|Y
01|246889|2|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|246889|2|3|customer's supplied RFID chip and holder re-balanced.|Y
01|246889|3|1|Net price includes the following parts for assembly|Y
01|246889|3|2|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|246889|3|3|and customers RFID chips. Holders to be re-balanced.|Y
01|246889|42|1|Net price includes the following parts for assembly|Y
01|246889|42|2|at Lyndex-Nikken: HSK63-Tube and customer's supplied|Y
01|246889|42|3|RFID chip and holder re-balanced.|Y
01|246898|1|1|INCQ2603-0438 0001|Y
01|246901|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|246901|5|1|36 LONG X 12-15 DEEP TRUNNION FROM MARTIN TRUNNION|Y
01|246901|6|1|CUSTOM BASEPLATE FOR OKUMA M660V|Y
01|246905|1|1|RGA#TOR-62819/|Y
01|246905|1|2|Customer declined repair of PF-2 requested return|Y
01|246909|1|1|Includes 5 SF holders BT40/CAT40|Y
01|246909|1|2|up to 6 inch gauge length|Y
01|246909|2|1|Includes 5 SF holders BT40/CAT40|Y
01|246909|2|2|up to 6 inch gauge length|Y
01|246938|1|1|P/N: H80A-MRAM|Y
01|246938|1|2|Modular AngleHead Taper HSK80A w/o Positioning Arm|Y
01|246938|6|1|P/N: CN-01|Y
01|246938|6|2|NSK Nakanishi Extension|Y
01|246941|1|1|P/N: H80A-MRAM|Y
01|246941|1|2|Modular AngleHead Taper HSK80A w/o Positioning Arm|Y
01|246941|6|1|P/N: CN-01|Y
01|246941|6|2|NSK Nakanishi Extension|Y
01|246948|3|1|16 Scroll Chuck and adapter|Y
01|246950|1|1|BMT75 C5 Live Tool - BMT75-C5Z-ICE.|Y
01|246950|1|2|Please allow 10 weeks for design & manufacturing after|Y
01|246950|1|3|approval drawing and 2 weeks for delivery. These are|Y
01|246950|1|4|non-standard stock and considered special. Once PO or|Y
01|246950|1|5|order is issued these can't be cancelled or returned.|Y
01|246959|1|1|Non-cancellable non-returnable|Y
01|246965|1|1|Material #YNA0173623-MO / new part # for NIK-1555-300.|Y
01|246965|1|2|Ordered on Toyota Tsusho PO 21687112.|Y
01|246965|3|1|Material #YNA0173623-MO / new part # for NIK-1555-300.|Y
01|246965|3|2|Ordered on Toyota Tsusho PO 21698466.|Y
01|246965|5|1|Material #YNA0173624-MO|Y
01|246965|5|2|Ordered on Toyota Tsusho PO 21698426.|Y
01|246972|2|1|H80F-SF0250-2.36  HSK80F Shrink Fit Holder 1/4 20K|Y
01|246972|2|2|With Makino Pins|Y
01|246972|4|1|H80F-SF0375-2.36  HSK80F Shrink Fit Holder 3/8 20K|Y
01|246972|4|2|With Makino Pins|Y
01|246972|5|1|H80F-SF0375-2.36  HSK80F Shrink Fit Holder 3/8 20K|Y
01|246972|5|2|With Makino Pins|Y
01|246972|7|1|H80F-SF0500-2.36  HSK80F Shrink Fit Holder 1/2 20K|Y
01|246972|7|2|With Makino Pins|Y
01|246972|8|1|H80F-SF0500-2.36  HSK80F Shrink Fit Holder 1/2 20K|Y
01|246972|8|2|With Makino Pins|Y
01|246972|10|1|H80F-SF0500-2.95  HSK80F Shrink Fit Holder 1/2 20K|Y
01|246972|10|2|With Makino Pins|Y
01|246972|11|1|H80F-SF0500-2.95  HSK80F Shrink Fit Holder 1/2 20K|Y
01|246972|11|2|With Makino Pins|Y
01|246983|1|1|RGA#CUR-62820/|Y
01|246983|1|2|Repair of NC50RAM-SM12-215C-110TP3P SN:9167602|Y
01|246983|1|3|(Mim#190468)|Y
01|246983|2|1|Bearings seals o-rings damaged gears to be replaced|Y
01|246989|2|1|ONE TIME USE ONLY. REMOVING THEM DESTROYS THEM.|Y
01|246989|2|2|SOLD IN PACKAGES OF 50.  6 NEEDED PER ZERO POINT BASE|Y
01|246989|7|1|16MM T-SLOT - M12x1.75 T NUT|Y
01|246989|8|1|M12x1.75 SHCS - 50MM LONG|Y
01|246989|9|1|T SLOT COVER - 40 FEET TOTAL|Y
01|246989|9|2|VERIFY VM3 HAS T SLOTS OR GRID TABLE|Y
01|246989|10|1|2 AIR FITTINGS AND 6MM AIR LINE TO PLUMB|Y
01|246989|10|2|WH-ZP120-BASE6-P200 TO AIR SUPPLY AT BACK OF MACHINE|Y
01|246992|1|1|non-cancellable non-returnable|Y
01|247002|3|1|Estimated lead time is 3~5 days after design approval.|Y
01|247004|4|1|Estimated lead time is 3~5 days after design approval.|Y
01|247008|3|1|RT CABLES DRIVE DRIVE INSTALLATION HARDWARE|Y
01|247008|3|2|PARAMETER TABLES FOR SELF INSTALL|Y
01|247009|7|1|E12 SOCKET|Y
01|247009|7|2|MCMASTER#7971N107; $8.49|N
01|247013|1|1|Estimated lead time is 3~5 days after receipt of an|Y
01|247013|1|2|order.|Y
01|247015|1|1|H80F-SF0250-2.36B HSK80F Shrink Fit Holder 1/4|Y
01|247015|1|2|With Makino Pins / Balanced at G2.5 X 33K|Y
01|247015|1|3|Quoted at NET price.|Y
01|247015|2|1|H80F-SF0250-2.36B HSK80F Shrink Fit Holder 1/4|Y
01|247015|2|2|With Makino Pins / Balanced at G2.5 X 33K|Y
01|247015|2|3|Quoted at NET price.|Y
01|247015|4|1|H80F-SF0375-2.36B HSK80F Shrink Fit Holder 3/8|Y
01|247015|4|2|With Makino Pins / Balanced at G2.5 X 33K|Y
01|247015|4|3|Quoted at NET price.|Y
01|247015|5|1|H80F-SF0375-2.36B HSK80F Shrink Fit Holder 3/8|Y
01|247015|5|2|With Makino Pins / Balanced at G2.5 X 33K|Y
01|247015|5|3|Quoted at NET price.|Y
01|247015|7|1|H80F-SF0500-2.36B HSK80F Shrink Fit Holder 1/2|Y
01|247015|7|2|With Makino Pins / Balanced at G2.5 X 33K|Y
01|247015|7|3|Quoted at NET price.|Y
01|247015|8|1|H80F-SF0500-2.36B HSK80F Shrink Fit Holder 1/2|Y
01|247015|8|2|With Makino Pins / Balanced at G2.5 X 33K|Y
01|247015|8|3|Quoted at NET price.|Y
01|247015|10|1|H80F-SF0500-2.95B HSK80F Shrink Fit Holder 1/2|Y
01|247015|10|2|With Makino Pins / Balanced at G2.5 X 33K|Y
01|247015|10|3|Quoted at NET price.|Y
01|247015|11|1|H80F-SF0500-2.95B HSK80F Shrink Fit Holder 1/2|Y
01|247015|11|2|With Makino Pins / Balanced at G2.5 X 33K|Y
01|247015|11|3|Quoted at NET price.|Y
01|247015|12|1|Quote at NET price.|Y
01|247037|33|1|This back-up screw will not work on HSK63A-SK16C-120.|Y
01|247037|33|2|HSK63A-SK16C-120 needs SKG16-10HG|Y
01|247037|34|1|This back uo screw is for the HSK63A-SK16C-120.|Y
01|247038|5|1|Estimated delivery is end of March/early April.|Y
01|247058|2|1|ONE TIME USE ONLY. REMOVING THEM DESTROYS THEM.|Y
01|247058|2|2|SOLD IN PACKAGES OF 50.  6 NEEDED PER ZERO POINT BASE|Y
01|247058|3|1|ZERO CLAMP ALIGNMENT DEVICE FOR CMM GRID CONNECTION|Y
01|247063|2|1|C6-SK6-150|Y
01|247066|3|1|SK25 Slim Chuck Collet 11mm|Y
01|247066|4|1|This collet collapses 12.0 down to 11.5.|Y
01|247089|1|1|Includes AY0200 Air/Hyd booster.|Y
01|247095|6|1|Additional 20% Overstock Promo applied|Y
01|247095|6|2|**non-cancellable non-returnable**|Y
01|247095|7|1|Additional 20% Overstock Promo applied|Y
01|247095|7|2|**non-cancellable nono-returnable**|Y
01|247095|8|1|Valid for B5004-0003-1.75 B4004-005-4.13 only|Y
01|247107|1|1|H80F-MRAM-IC|Y
01|247107|1|2|Modular AngleHead Taper HSK80F w/o Positioning Arm|Y
01|247107|1|3|Through spindle coolant|Y
01|247107|13|1|Quoted at Net price. If order is placed we will ship|Y
01|247107|13|2|the angle head so your customer can send measurements|Y
01|247107|13|3|to our engineering department so the block can be made.|Y
01|247118|7|1|SKJ10-2.5 - please note these are considered special|Y
01|247118|7|2|& quoted at special net price. Once PO/order issued|Y
01|247118|7|3|these can't be cancelled or returned.|Y
01|247120|8|1|Final Sale-Non-cancellableNon-returnable|Y
01|247120|8|2|quoted at NET Pricing|Y
01|247120|9|1|Final Sale-Non-cancellableNon-returnable|Y
01|247120|9|2|Quoted at NET pricing|Y
01|247120|10|1|Final Sale-Non-cancellableNon-returnable|Y
01|247120|10|2|Quoted at NET pricing|Y
01|247121|1|1|C8-EM1250-9.84 C8 1.1/4 End Mill holder 9.84GL|Y
01|247121|1|2|Special:Non-cancellable/Non-returnable once PO received|Y
01|247121|1|3|Signed approval drawing required at time of purchase.|Y
01|247121|1|4|Quoted at NET pricing|Y
01|247126|1|1|C5001-32-100CP|Y
01|247126|1|2|CAT50 Shell Mill Holder 32mm X 100mm gage length|Y
01|247126|1|3|Coolant Ports Chip Hole 20K|Y
01|247126|1|4|Quoted at NET price|Y
01|247126|2|1|C5001-32-250CP|Y
01|247126|2|2|CAT50 Shell Mill Holder 32mm X 250mm gage length|Y
01|247126|2|3|Coolant Ports Chip Hole 20K|Y
01|247126|2|4|Quoted at NET price.|Y
01|247126|3|1|C5001-32-200CP|Y
01|247126|3|2|CAT50 Shell Mill Holder 32mm X 200mm gage length|Y
01|247126|3|3|Coolant Ports Chip Hole 20K|Y
01|247126|3|4|Quoted at NET price.|Y
01|247132|1|1|part# F100.25-SK16-97|Y
01|247132|1|2|Flange mount style SK16 adapter|Y
01|247132|1|3|Special-can not be cancelled or returned.|Y
01|247132|1|4|Quoted at NET pricing|Y
01|247144|3|1|CAT50 Shell Mill Holder 3/4 CoolantPorts ChipHole 20K|Y
01|247144|3|2|C5001-0750-10.00CP|Y
01|247144|8|1|CAT50 Shell Mill Holder 1 CoolantPorts ChipHole 20K|Y
01|247144|8|2|C5001-1000-10.00CP|Y
01|247144|13|1|CAT50 Shell Mill Holder 1.1/4 CoolantPorts ChipHole20K|Y
01|247144|13|2|C5001-1250-10.00CP|Y
01|247144|16|1|Currently two (2) in stock in Illinois.  Estimated|Y
01|247144|16|2|lead time for balance is early/mid June.|Y
01|247147|1|1|SN:7021 EU:Instrument Development Company LLC|Y
01|247147|1|2|RGA#TAR-62768 5AX-130FA-M|Y
01|247154|3|1|Overstock Discount 20% applied to this tool only.|Y
01|247154|3|2|Wrench for this holder only is 016-SPAN in stock|Y
01|247154|3|3|List $18.00 less 40%|Y
01|247156|2|1|Estimated lead time is mid/end April.|Y
01|247156|3|1|Estimated lead time is mid/end April.|Y
01|247158|8|1|TCE-C6069/0 see replacement cable below|Y
01|247158|9|1|TCE-98D27/1 see replacement cable below|Y
01|247158|10|1|TCE-C6070/0 see replacement cable below|Y
01|247158|11|1|TCE-98F81/0 see replacement cable below|Y
01|247159|1|1|Please note this is non-standard stock and considered|Y
01|247159|1|2|special. This has been quoted at special net price.|Y
01|247159|1|3|Once PO/order issued these can't be cancelled or|Y
01|247159|1|4|returned.|Y
01|247167|15|1|NET PRICE QUOTED|Y
01|247179|1|1|Din 2 Hole|Y
01|247179|2|1|DIN 2 Hole|Y
01|247179|4|1|DIN 2 Holes|Y
01|247179|5|1|DIN 2 Holes|Y
01|247183|1|1|APPLICATION NOTES:|Y
01|247183|1|2|FOR DNM5700L VMC W/ FANUC 0I-MF+|Y
01|247183|1|3|RIGHT SIDE TABLE INSTALLATION W-H DESIGN PENDING|Y
01|247183|7|1|SET OF 4 LOCATION KEYS FOR M120S TO 5AX-201 TABLE|Y
01|247183|7|2|SEE TIM REEVES|Y
01|247183|20|1|USED TABLE SN: 6671|Y
01|247183|20|2|PRICE INCLUDES ADDING ON MOTORS|Y
01|247183|20|3|ALL USED CARRIES STANDARD CONDITIONAL WARRANTY|Y
01|247183|20|4|TABLE IS PREPPED AND COMPLETES SAME RIGOROUS PRE-|Y
01|247183|20|5|SHIPMENT QUALITY CHECKS. PERFORMANCE MEETS NEW|Y
01|247183|20|6|PRODUCT FUNCTION.|Y
01|247183|20|7|USED MEANS SOME COSMETIC WEAR LIKE PAINT CHIPS|Y
01|247183|20|8|SCRATCHES ETC. SHOULD BE EXPECTED.|Y
01|247188|5|1|NET PRICING|Y
01|247188|9|1|Mazak C700 Base Plate w/Cover Sheet|Y
01|247188|9|2|Non Cancelable Non Returnable 20% Deposit with order|Y
01|247188|11|1|ZLOX Base Plate + Riser 125mm. For a WH-ZLOX-P80Z|Y
01|247188|11|2|with pull studs at 200mm pitch|Y
01|247193|1|1|BT50-FMC22-60|Y
01|247200|1|1|non-cancellable non-returnable|Y
01|247200|1|2|Additional 20% Overstock Promo discount applied|Y
01|247204|4|1|external power and feedback cables|Y
01|247205|1|1|Final Part# C5006-0500-4.00CP-M|Y
01|247205|1|2|**non-cancellable non-returnable**|Y
01|247205|2|1|Final Part# C5006-0625-3.00CP-M|Y
01|247205|2|2|**non-cancellable non-returnable**|Y
01|247205|3|1|Final Part# C5006-0625-4.00CP-M|Y
01|247205|3|2|**non-cancellable non-returnable**|Y
01|247205|4|1|Final Part# C5006-0750-3.00CP-M|Y
01|247205|4|2|**non-cancellable non-returnable**|Y
01|247205|5|1|Final Part# C5006-0750-4.00CP-M|Y
01|247205|5|2|**non-cancellable non-returnable**|Y
01|247209|3|1|16 Chuck and adapter plate|Y
01|247230|9|1|A tariff surcharge may be added to this quotation in|Y
01|247230|9|2|the event of a sustained tariff increase on the|Y
01|247230|9|3|importation of this product.  Any surcharge will be|Y
01|247230|9|4|disclosed prior to acceptance of an order.|Y
01|247232|1|1|5AX-RED200-250xxxxxx|Y
01|247232|1|2|Cam Style Tilt Table RED200 Airbrake|Y
01|247232|1|3|with xxxx ports Rotary Joint|Y
01|247262|1|1|RGA#TOR-62836/|Y
01|247262|1|2|Repair of C5005-0875-3.86|Y
01|247280|1|1|Currently one (1) in stock at the factory - lead time|Y
01|247280|1|2|is 1~2 weeks ARO.  Estimated lead time for the balance|Y
01|247280|1|3|of five (5) is 16~18 weeks after receipt of an order.|Y
01|247291|1|1|8 weeks leadtime after receipt of order|Y
01|247293|97|1|Part Number: E11-020|Y
01|247293|97|2|ER11 Collet 5/16|Y
01|247293|98|1|Part Number: E11-018|Y
01|247293|98|2|ER11 Collet 9/32|Y
01|247293|99|1|Part Number: E16-007|Y
01|247293|99|2|ER16 Collet 7/64|Y
01|247293|100|1|Part Number: E16-009|Y
01|247293|100|2|ER16 Collet 9/64|Y
01|247293|101|1|Part Number: E32-004|Y
01|247293|101|2|ER32 1/16 Collet|Y
01|247293|102|1|Part Number: E32-052|Y
01|247293|102|2|ER32 Collet 13/16|Y
01|247293|103|1|Part Number: E32-006|Y
01|247293|103|2|ER32 Collet 3/32|Y
01|247293|104|1|Part Number: E40-008|Y
01|247293|104|2|ER40 Collet 1/8|Y
01|247293|106|1|Part Number: E32-118(C)|Y
01|247293|106|2|ER32 Collet 3.0mm Mechanical Coolant Seal|Y
01|247293|107|1|Part Number: E32-157(C)|Y
01|247293|107|2|ER32 Collet 4.0mm Mechanical Coolant Seal|Y
01|247293|108|1|Part Number: E32-236(C)|Y
01|247293|108|2|ER32 Collet 6.0mm Mechanical Coolant Seal|Y
01|247293|109|1|Part Number: E32-275(C)|Y
01|247293|109|2|ER32 Collet 7.0mm Mechanical Coolant Seal|Y
01|247296|1|1|Additional 20% Overstock promo discount applied.|Y
01|247296|1|2|Non-cancellable non-returnable item.|Y
01|247298|9|1|Mazak API licenses and Ethernet libraries are required|Y
01|247299|9|1|Mazak API licenses and Ethernet libraries are required|Y
01|247319|1|1|Part Number: TBD|Y
01|247319|1|2|Similar to Part#: A166753 with BCV50 Taper|Y
01|247319|1|3|L=358mm Complete with torque support and locking|Y
01|247319|1|4|mechanism 3-Pin support machine. Machine-specific|Y
01|247319|1|5|adaptation to Heimatic Tool 703366040-Shank holder|Y
01|247319|1|6|Output: ER32 Collets Angle Head 360Deg continuously|Y
01|247319|1|7|adjustable without coolant no direction of rotation|Y
01|247319|1|8|reversal.|Y
01|247319|1|9|Delivery: 14-16 Weeks ADA - After Signed Dwg Approval|Y
01|247319|1|10|Please allow 4 weeks to procure approval drawing.|Y
01|247328|1|1|AIR CUT 4/3 for ETA Mid April|Y
01|247332|1|1|Currently three (3) in stock in Illinois.  We also|Y
01|247332|1|2|currently have five (5) in stock at the factory. Order|Y
01|247332|1|3|must be placed by 3/27 for mid April delivery.  The|Y
01|247332|1|4|remaining balance is mid/end May if ordered by 3/27.|Y
01|247332|1|5|Otherwise estimated lead time will be 10~12 weeks ARO.|Y
01|247335|1|1|NET Pricing|Y
01|247335|3|1|NET Pricing|Y
01|247335|5|1|NET PRICING - Stock at Factory - Air Shipment 2 week|Y
01|247335|5|2|A.R.O|Y
01|247335|7|1|NET Pricing|Y
01|247335|9|1|Mazak C700 Base Plate w/Cover Sheet|Y
01|247335|9|2|NET PRICING|Y
01|247335|9|3|Manufacure 8 Weeks + 2 Weeks Air Shipment|Y
01|247335|9|4|Non Cancelable Non Returnable : 20% Deposit with order|Y
01|247335|11|1|ZLOX Base Plate + Riser 125mm. For a WH-ZLOX-P80Z with|Y
01|247335|11|2|pull studs at 200mm pitch|Y
01|247343|1|1|Estimated lead time is 20~22 weeks after receipt of|Y
01|247343|1|2|an order.|Y
01|247359|2|1|**new nomenclature of HSK63A-SK6C-100P-IDU**|Y
01|247363|5|1|4th and 5th Power and Feedback Cables|Y
01|247363|5|2|Set Per Table|Y
01|247374|1|1|NC4007-0020-2.50|Y
01|247374|1|2|NCAT40 DualContact ER20 ColletChuck Bearing Nut|Y
01|247374|2|1|NC4007-0020-2.50|Y
01|247374|2|2|NCAT40 DualContact ER20 ColletChuck Bearing Nut|Y
01|247374|3|1|NC4007-0025-2.50|Y
01|247374|3|2|NCAT40 DualContact ER25 ColletChuck ChipHole BearingNut|Y
01|247374|4|1|NC4007-0025-4.00|Y
01|247374|4|2|NCAT40 DualContact ER25 Collet Chuck Bearing Nut|Y
01|247374|5|1|NC4007-0025-4.00|Y
01|247374|5|2|NCAT40 DualContact ER25 Collet Chuck Bearing Nut|Y
01|247374|6|1|NC4007-0032-5.00|Y
01|247374|6|2|NCAT40 DualContact ER32 Collet Chuck Bearing Nut|Y
01|247374|7|1|NC4007-0032-5.00|Y
01|247374|7|2|NCAT40 DualCont ER32 ColletChuck ChipHole Bearing Nut|Y
01|247374|9|1|NC4007-0025-2.50|Y
01|247374|9|2|NCAT40 DualContact ER25 ColletChuck BearingNut 25K|Y
01|247374|12|1|NC4007-0025-4.00|Y
01|247374|12|2|NCAT40 DualContact ER25 ColletChuck BearingNut|Y
01|247379|1|1|Special - cannot be cancelled or returned|Y
01|247385|1|1|**Must ship via LTL Freight**|Y
01|247385|1|2|Non-cancellable non-returnable|Y
01|247391|1|1|SN:31465TC EU:Ametek|Y
01|247391|1|2|RGA#TAR-62637 CNC202LFA|Y
01|247404|1|1|Zero Clamp #37194 Tombstone|Y
01|247404|1|2|Unfinished tower with 6 + 6 =12 NP120 Clamping Units|Y
01|247404|1|3|200mm distance.|Y
01|247404|1|4|Quoted at NET price.|Y
01|247404|2|1|Base plate 500x500x50mm. Includes 2x housing P/N 21322|Y
01|247404|2|2|and 4x change over valve.|Y
01|247409|1|1|BMT75 C5 Live Tool - BMT75-C5Z-ICE.|Y
01|247409|1|2|Please allow 10 weeks for design & manufacturing after|Y
01|247409|1|3|approval drawing and 2 weeks for delivery. These are|Y
01|247409|1|4|non-standard stock and considered special. Once PO or|Y
01|247409|1|5|order is issued these can't be cancelled or returned.|Y
01|247412|13|1|C6-SK10-150(TB)|Y
01|247412|13|2|Tapered body per attached dwg.|Y
01|247412|14|1|C6-SK10-150(TB)|Y
01|247412|15|1|C6-SK6-150(TB)|Y
01|247416|1|1|CMX special pricing includes installation.|Y
01|247417|1|1|CMX1100 special pricing with installation|Y
01|247422|3|1|No Drive Pin.|Y
01|247422|3|2|QUOTED AT NET PRICING.|Y
01|247422|10|1|With Makino Pin.|Y
01|247422|10|2|QUOTED AT NET PRICING.|Y
01|247422|10|3|Nikken Item # HSK63F/LPM-C1.1/4-110G|Y
01|247429|1|1|1st Batch/|N
01|247429|2|1|T/P Inspection RequiredStock/AIR|N
01|247433|1|1|Minimum order QTY 5pcs|Y
01|247438|1|1|Zero Clamp #37194 Net Price rflects a order of 1|Y
01|247438|1|2|Tombstone Unfinished tower with 6 + 6 =12 NP120|Y
01|247438|1|3|Clamping Units 200mm distance.|Y
01|247438|1|4|The base plate is included in Tower (#37194)|Y
01|247438|1|5|Base plate 500x500x50mm. Includes 2x housing P/N 21322|Y
01|247438|1|6|and 4x change over valve.|Y
01|247438|1|7|Quoted at NET price each.|Y
01|247438|2|1|Zero Clamp #10003 >> Quick coupling socket 1/4 NW 72|Y
01|247438|2|2|Quoted at NET price.|Y
01|247438|4|1|NET price reflects a purchase os (2) Tombstones|Y
01|247442|1|1|Estimated lead time is early/mid April.|Y
01|247444|1|1|Currently one (1) in stock in Illinois.  Estimated|N
01|247444|1|2|lead time for balance is 2~3 weeks after receipt of an|N
01|247444|1|3|order.  Item is special non-standard stock.  Once a|N
01|247444|1|4|Purchase Order has been received this item cannot be|N
01|247444|1|5|cancelled or returned.|N
01|247444|3|1|Holder is special non-standard stock.  Once a|N
01|247444|3|2|Purchase Order is received this item cannot be|N
01|247444|3|3|cancelled or returned.|N
01|247444|4|1|Holder is special non-standard stock.  Once a Purchase|Y
01|247444|4|2|Order is received this item cannot be cancelled or|Y
01|247444|4|3|returned.|Y
01|247444|6|1|Currently three (3) in stock in Illinois with|N
01|247444|6|2|additional stock at the factory that will have a 2~3|N
01|247444|6|3|week lead time after receipt of an order.|N
01|247456|1|1|RGA#LVR-62413/|Y
01|247456|1|2|Repair of MNL12-ER32Z SN:A0849 (Alps#T32207)|Y
01|247456|2|1|Bearings o-rings Drive Shaft and collet nut to be|Y
01|247456|2|2|replaced|Y
01|247464|1|1|B40SF-18-90|Y
01|247464|2|1|B40SF-18-120|Y
01|247464|3|1|B40SF-18-160|Y
01|247466|1|1|*Lead time currently unknown hole popper is down.|Y
01|247477|1|1|Special QCFC65 collet as per drawing|Y
01|247488|5|1|Currently 4 in stock in Illinois.  Estimated lead time|Y
01|247488|5|2|for the balance is 1~2 weeks after receipt of an order.|Y
01|247488|7|1|Currently 13 in stock in Illinois estimated lead time|Y
01|247488|7|2|for the balance is 1~2 weeks after receipt of an order.|Y
01|247489|1|1|**non-cancellable non-returnable**|Y
01|247492|2|1|Please note additional 20% has been added for overstock|Y
01|247492|2|2|promotion. These cannot be cancelled or returned upon|Y
01|247492|2|3|receipt of PO or order.|Y
01|247498|35|1|Replacement for TCLA-40/63A/C6|Y
01|247502|4|1|A tariff surcharge may be added to this quotation in|Y
01|247502|4|2|the event of a sustained tariff increase on the|Y
01|247502|4|3|importation of this product.  Any surcharge will be|Y
01|247502|4|4|disclosed prior to acceptance of an order.|Y
01|247504|1|1|Zero Clamp #37194 Net Price rflects a order of 1|Y
01|247504|1|2|Tombstone Unfinished tower with 6 + 6 =12 NP120|Y
01|247504|1|3|Clamping Units 200mm distance.|Y
01|247504|1|4|The base plate is included in Tower (#37194)|Y
01|247504|1|5|Base plate 500x500x50mm. Includes 2x housing P/N 21322|Y
01|247504|1|6|and 4x change over valve.|Y
01|247504|1|7|Quoted at NET price each.|Y
01|247504|2|1|Zero Clamp #10003 >> Quick coupling socket 1/4 NW 72|Y
01|247504|2|2|Quoted at NET price.|Y
01|247509|1|1|*NET|Y
01|247509|11|1|*NON-coolant for 19/32|Y
01|247515|9|1|Alternative for 1/16|Y
01|247528|1|1|**non-cancellable non-returnable**|Y
01|247532|1|1|Currently ten (10) in stock in IL.|Y
01|247532|2|1|Currently two (2) in stock in IL.|Y
01|247553|1|1|Delivery is based upon receipt of order.|Y
01|247560|1|1|Howa part # ORC63x1200-M-L|Y
01|247560|1|2|Howa Rodless Cylinder - Item NET Weight: 20kg (44 LBS)|Y
01|247560|1|3|This item is considered special once ordered it cannot|Y
01|247560|1|4|be cancelled or returned.|Y
01|247570|2|1|NET pricing - Blackhawk GP to be 17.5 % = $393 to|Y
01|247570|2|2|Blue Origin|Y
01|247576|1|1|Currently one (1) in stock at the factory - lead time|Y
01|247576|1|2|is 1~2 weeks ARO.  Estimated lead time for the balance|Y
01|247576|1|3|of five (5) is 16~18 weeks after receipt of an order.|Y
01|247583|3|1|MRAM-ER20 ANGLE HEAD ATTACHMENT - EXTENDED LENGTH|Y
01|247583|3|2|8 OVERALL USABLE LENGTH|Y
01|247583|3|4|SPECIAL PRODUCT; NET PRICING; ONCE ORDER IS PLACED|Y
01|247583|3|5|IT CANNOT BE CANCELLED; PRODUCT IS NOT RETURNABLE|Y
01|247583|3|6|FOR ANY REASON OTHER THAN MANUFACTURING DEFECTS|Y
01|247583|4|1|POSITIONING BLOCK FOR HAAS CAT40 MACHINE|Y
01|247583|4|2|6 CAP SCREW OR 10 SCREW DESIGN|Y
01|247588|1|1|RGA#CUR-62685/|Y
01|247588|1|2|Repair of CAT50U-NX5-151 SN:QC1F-053|Y
01|247620|1|1|Final Part# TBD **NET PRICE**|Y
01|247620|1|2|Back Spot Facing Tool 1|Y
01|247620|1|3|Custom Special - cannot be cancelled or returned|Y
01|247620|2|1|Final Part# TBD **NET PRICE**|Y
01|247620|2|2|Back Spot Facing Tool 2|Y
01|247620|2|3|Custom Special - cannot be cancelled or returned|Y
01|247620|3|1|Final Part# TBD **NET PRICE**|Y
01|247620|3|2|Back Spot Facing Tool 3|Y
01|247620|3|3|Custom Special - cannot be cancelled or returned|Y
01|247620|4|1|Final Part# TBD **NET PRICE**|Y
01|247620|4|2|Back Spot Facing Tool 4|Y
01|247620|4|3|Custom Special - cannot be cancelled or returned|Y
01|247620|5|1|Final Part# TBD **NET PRICE**|Y
01|247620|5|2|Back Spot Facing Tool 5|Y
01|247620|5|3|Custom Special - cannot be cancelled or returned|Y
01|247621|1|1|Please Note: This tool is non standard stock. Once|Y
01|247621|1|2|a purchase order is placed it cannot be cancelled or|Y
01|247621|1|3|returned.|Y
01|247622|1|1|We currently have 13 in stock estimated lead time|Y
01|247622|1|2|for the balance is one week.|Y
01|247626|1|1|No Inspection Required|Y
01|247647|1|1|HSK20E-MVH4-33|Y
01|247647|2|1|HSK25E-MVH4-45|Y
01|247647|3|1|HSK32E-MVHT4-60|Y
01|247647|4|1|Collet MVK4-3|Y
01|247647|5|1|Collet Extractor|Y
01|247647|5|2|MVKR-4|Y
01|247647|6|1|Micro CH Handle|Y
01|247647|6|2|GH4MVH|Y
01|247659|1|1|5AX-130BAYABR-QT|Y
01|247659|1|2|Tilt Table 130mm  w/motor|Y
01|247663|1|1|Please note: BT40-WE3/8-65 is non-returnable.|Y
01|247664|1|1|P/N: TBD|Y
01|247664|1|2|3J custom collet  0.994|Y
01|247668|1|1|Discount reflects a purchase order of 15~20 holders.|Y
01|247668|2|1|Discount reflects a purchase order of 15~20 holders.|Y
01|247668|7|1|Discount reflects a purchase order of 15~20 holders.|Y
01|247668|8|1|Discount reflects a purchase order of 15~20 holders.|Y
01|247669|1|1|LN to make block|Y
01|247669|1|2|Lead time 1 week after receipt of spindle Z spec|Y
01|247673|1|1|SN:12878C EU:XXX|Y
01|247673|1|2|RGA#TAR-62833 CNC302FA-M|Y
01|247708|2|1|*Complete special non-cancellable and non-returnable.|Y
01|247712|1|1|Includes Power and Feedback Cables from Nikken table|Y
01|247712|1|2|to the machine bulkhead|Y
01|247717|27|1|*Expedite Fee to be determined if backorder items|Y
01|247717|27|2|ordered and needed before 5/Mid.|Y
01|247717|27|3|Estimate 1-2 weeks with expedite 5/Mid otherwise.|Y
01|247720|1|1|Estimated lead time is 8~10 weeks after receipt of an|Y
01|247720|1|2|order.|Y
01|247723|1|1|Discontinued - non-cancellable/non-returnable|Y
01|247724|1|1|Estimated lead time is 8~10 weeks after receipt of an|Y
01|247724|1|2|order.|Y
01|247735|1|1|Special NET pricing|Y
01|247737|1|1|RGA#LVR-62853/|Y
01|247737|1|2|Repair of MNL12-ER32Z-MS-10K SN:9015501 (Mim#191545)|Y
01|247737|2|1|Bearings seals and o-rings to be replaced|Y
01|247756|1|1|100pc minimum|Y
01|247756|2|1|100pc minimum|Y
01|247756|3|1|100pc minimum|Y
01|247756|4|1|Qty 100-499|Y
01|247758|1|1|RGA#CUR-62852/|Y
01|247758|1|2|Repair of C40RA-0025M SN:2190372808 (Mim#175241)|Y
01|247758|2|1|Bearings seals and o-rings to be replaced|Y
01|247764|1|1|No INS Required.|Y
01|247764|2|1|No INS Required.|Y
01|247775|2|1|196448-NT44-ER25Z-ICE|Y
01|247775|2|2|No Cancel No Return Item|Y
01|247775|3|1|196444-NT44-ER25X-ICE|Y
01|247775|3|2|No Cancel No Return Item|Y
01|247804|1|1|For budgetary pricing please contact at time of PO|Y
01|247805|1|1|Calibration service and preventative maintenance on|Y
01|247805|1|2|Sethy 6 Presetter SN:6173|Y
01|247805|2|1|On-Site Service Call ESTIMATE for Travel/Time/Labor|Y
01|247809|1|1|Pots for your Base Plate|Y
01|247809|2|1|Studs for the pots|Y
01|247809|4|1|Pots for your base plate|Y
01|247809|5|1|studs for the pots|Y
01|247809|7|1|For your base plate to connect base pots to the|Y
01|247809|7|2|compressed air supply|Y
01|247809|9|1|19.7 x 19.7 Zero Point Base Unit includes qty 6|Y
01|247809|9|2|120MM Pots and Base Plate|Y
01|247814|1|1|MSC SKU: 13121223|Y
01|247814|1|2|SN: 2J7167|Y
01|247814|2|1|MSC SKU: 44937977|Y
01|247814|2|2|Included with SF Unit|Y
01|247814|3|1|MSC SKU: 39353966|Y
01|247814|4|1|MSC SKU: 39353982|Y
01|247814|5|1|MSC SKU: 39351648|Y
01|247816|1|1|Overhaul/Repair|Y
01|247816|1|2|CNC400HFA-9. Serial#6018 (changed from SN#6075)|Y
01|247816|1|3|RGA#TAR-62899|Y
01|247816|1|4|Nidec OKK HPM40|Y
01|247816|1|5|Total Net price of overhaul for the captioned RT|Y
01|247829|1|1|P/N: QCFC42-080-SMO-SP    SAMPLE|Y
01|247829|1|2|with carbide surface treatment for improved gripping.|Y
01|247834|26|1|Additional 20% Overstock Promo discount applied to all|Y
01|247834|26|2|tools above.|Y
01|247834|26|3|**Overstock Items cannot be cancelled or returned|Y
01|247834|26|4|upon receipt of PO**|Y
01|247835|1|1|Ref CNC260FA-10+1. Match with SN#13675|Y
01|247835|1|2|SP Order. Net price.|Y
01|247835|1|3|Lead time: 2 - 2.5 month MFG + Ship (air) 2 weeks|Y
01|247835|2|1|Ref.CST101-135-4+1 matach with SN#854|Y
01|247835|2|2|SP Order. Net Price.|Y
01|247835|2|3|Lead time: 2 - 2.5 month Mfg + Ship (air) 2 weeks|Y
01|247835|2|4|final center height needs to be adjusted by Enshu USA|Y
01|247839|1|1|Balance of 6 holders ETA to L-N 06-05-26|Y
01|247845|1|1|Ref CNC260FA-10+1. Match with SN#13675|Y
01|247845|1|2|SP Order. Net price.|Y
01|247845|1|3|Lead time: 2 - 2.5 month MFG + Ship (air) 2 weeks|Y
01|247845|2|1|Ref.CST101-135-4+1 matach with SN#854|Y
01|247845|2|2|SP Order. Net Price.|Y
01|247845|2|3|Lead time: 2 - 2.5 month Mfg + Ship (air) 2 weeks|Y
01|247846|1|1|Match with SN#13675|Y
01|247846|1|2|SP Order. Net price.|Y
01|247846|1|3|Lead time: 2 - 2.5 month MFG + Ship (air) 2 weeks|Y
01|247846|2|1|Mtach with SN#854|Y
01|247846|2|2|SP Order. Net Price.|Y
01|247846|2|3|Lead time: 2 - 2.5 month Mfg + Ship (air) 2 weeks|Y
01|247848|19|1|Please note this is non-standard stock and considered|Y
01|247848|19|2|special. Once PO/order issued these can't be cancelled|Y
01|247848|19|3|or returned.|Y
01|247850|1|1|P/N: E32-EXT-125 with 5/8-16 threading|Y
01|247850|1|2|and .5 shank length|Y
01|247855|1|1|Match with SN#6075|Y
01|247855|1|2|Spec as per attached drawing#TCA-59037|Y
01|247855|1|3|Total Net Price for the captioned RT|Y
01|247855|1|4|Lead time. TBD|Y
01|247870|1|1|NBT30 Hydraulic Chuck 3mm. d2 = 14mmd3=18mm70mm GL|Y
01|247870|1|2|These are considered special and have been quoted at|Y
01|247870|1|3|special net price. Please allow 12 weeks after signed|Y
01|247870|1|4|approval drawing plus 2 weeks for delivery. Minimum|Y
01|247870|1|5|order quantity is 5 pieces.|Y
01|247883|9|1|Additional Software - TBD on price|Y
01|247894|13|1|Installation and Training performed by Eric Hartman.|Y
01|247908|1|1|Overhaul/Repair|Y
01|247908|1|2|CNC260FA-10+1. Serial#13675.|Y
01|247908|1|3|RGA#TAR-62892.|Y
01|247908|1|4|Enshu GE40.|Y
01|247908|1|5|Total Net price of overhaul for the captioned RT|Y
01|247933|1|1|Replaced B5017-1000-5.50|Y
01|247933|5|1|Estimated delivery time is 6~8 weeks after receipt of|Y
01|247933|5|2|an order.|Y
01|247933|9|1|BT50-C2-105 has been quoted at NET pricing.|Y
01|247933|9|2|Estimated lead time is five (5) months after receipt of|Y
01|247933|9|3|an order. Non-cancellable/non-returnable once a|Y
01|247933|9|4|purchase order has been received.|Y
01|247938|1|1|CNC501TFA with 10+1PRJ|Y
01|247938|1|2|Mtach with serial#6100|Y
01|247938|1|3|original request from Honda GA. MESD-APD|Y
01|247938|1|4|Total Net price for the captioned RT|Y
01|247938|1|5|Lead time. 3.5 months Mfg + shipping from Japan by Boat|Y
01|247938|1|6|Spec as per attached drawing#TCA-79020/3.|Y
01|247938|2|1|CNC501TFA with 10+1PRJ|Y
01|247938|2|2|Mtach with serial#6100|Y
01|247938|2|3|Total Net price for the captioned RT|Y
01|247938|2|4|Lead time. 3.5 months Mfg + shipping from Japan by Boat|Y
01|247938|2|5|Spec as per attached drawing#TCA-79020/3.|Y
01|247947|40|1|Please note this is non-standard stock and considered|Y
01|247947|40|2|special. Once PO/order issued these can't be cancelled|Y
01|247947|40|3|or returned.|Y
01|247959|2|1|Part Number: NBT50-SK20C-250|Y
01|247959|2|2|NBT50 DualContact Slim Chuck SK20 Coolant 2.4K|Y
01|247959|3|1|Part Number: NBT50-SK13C-300|Y
01|247959|3|2|NBT50 DualContact Slim Chuck SK13 Coolant 2.4K|Y
01|247964|3|1|this does not make since|Y
01|247969|1|1|SN:12716C EU:Paragon Medical|Y
01|247969|1|2|RGA#TAR-62866 CNC260FA-M|Y
01|247972|3|1|Currently one (1) in stock estimated lead time for|Y
01|247972|3|2|the balance is TBD.|Y
01|247972|23|1|Currently one (1) in stock estimated lead time for|Y
01|247972|23|2|the balance is mid/end May.|Y
01|247974|1|1|SN:11636C EU:Paragon Medical|Y
01|247974|1|2|RGA#TAR-62868 CNC260FA-M|Y
01|247981|1|1|RGA#CUR-62813/|Y
01|247981|1|2|Repair of 4x C40RAM-MI50-180-65TP SN:21903643 01|Y
01|247981|1|3|22903565 02 23906132 01 and 82203 02 (Mim#178151)|Y
01|247981|2|1|Bearings seals and o-rings to be replaced|Y
01|247982|2|1|Special - non cancellable non returnable|Y
01|247982|2|2|Details|Y
01|247982|2|3|details|Y
01|247987|1|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|247987|2|1|1st Batch/S#1029458 Orizon 1/21/26:DWG APROVED/Orizon|Y
01|247987|3|1|Req.INS/Check if RegoNut is equipped. S#1029458/Orizon|Y
01|247987|4|1|Req.INS/Install E32-NUTER32-SCREW(C) S#1029458/Orizon|Y
01|247987|5|1|Req.INS/Install E40-NUTER40-SCREW(C) S#1029458/Orizon|Y
01|247987|6|1|1st Batch/Install E40-NUT/ER40-SCREW(C) #1031615|Y
01|247987|7|1|Req.INS/S#1030356 S&S/Stellar *Need Inspection Sheet|Y
01|247993|1|1|Estimated lead time is 14~16 weeks after receipt of an|Y
01|247993|1|2|order.|Y
01|247995|3|1|Ships - 3 to 5 days upon signoff on spindle stop|Y
01|247995|3|2|block drawing|Y
01|248005|3|1|C4QC-SF8-49CP|Y
01|248005|3|2|SAB part number C4.SF08.049.IK|Y
01|248005|3|3|No ATC Flange|Y
01|248025|1|1|SN:6037 & 10026H EU:XXX|Y
01|248025|1|2|RGA#TAR-62202 CNC202|Y
01|248025|1|3|Tables determined to be unrepairable return requested|Y
01|248032|1|1|**non-cancellable non-returnable**|Y
01|248032|2|1|Final Part# TBD **NET Price**|Y
01|248032|2|2|A2-8 Adapter Plate for HW-10-2J3J-HS|Y
01|248032|2|3|Special - Non-cancellable non-returnable|Y
01|248032|2|4|Delivery:|Y
01|248038|4|1|Quoted at NET price.|Y
01|248042|3|1|HSK63A-VC6-90-J|Y
01|248042|3|2|HSK63A VC6 Collet Chuck w/ 90mm GL w/ no chip hole and|Y
01|248042|3|3|coolant nut (VCN-6BJ) installed at LN.|Y
01|248042|3|4|Estimated lead time is 4~6 Weeks after receipt of an|Y
01|248042|3|5|order.|Y
01|248042|5|1|HSK63A-VC13-90-J-IDU|Y
01|248042|5|2|HSK63A VC13 Collet Chuck w/ 90mm GL w/ chip hole and|Y
01|248042|5|3|coolant nut (VCN-13BJ) installed at LN.|Y
01|248042|5|4|Estimated lead time is 5~7 days after receipt of an|Y
01|248042|5|5|order.|Y
01|248042|28|1|Currently 14 in stock in Illinois.  Estimated lead time|Y
01|248042|28|2|for the balance of two (2) would be 1~2 weeks after|Y
01|248042|28|3|receipt of an order.|Y
01|248043|2|1|Please note C8-SK16-165/C8-SK16-165-EU are non-standard|Y
01|248043|2|2|stock. Once PO/order issued these can't be cancelled|Y
01|248043|2|3|or returned.|Y
01|248052|1|1|HSK63A-SM1000-3.00CP|Y
01|248052|1|2|Special Prebalanced and Balanceable to 30K with chip|Y
01|248052|1|3|hole.|Y
01|248052|1|4|Minimum Order Quantity (MOQ) of 2 pieces.  Customer|Y
01|248052|1|5|must accept +1~2 overrun/-1 underrun should it occur.|Y
01|248052|1|6|At that time a revised PO will be requested.|Y
01|248052|3|1|Nikken Item # will be:  HSK63A-VC6-90B-J|Y
01|248052|3|2|Special Prebalanced and Balanceable to 30K with chip|Y
01|248052|3|3|hole and coolant nut VCN-6BJ.|Y
01|248052|5|1|Niken Item # will be:  HSK63A-VC13-90B-J|Y
01|248052|5|2|Special Prebalanced and Balanceable to 30K with chip|Y
01|248052|5|3|hole and coolant nut VCN-13BJ.|Y
01|248052|7|1|NOTE:  This kit based upon receipt of a purchase order|Y
01|248052|7|2|after final drawing approval has been received.|Y
01|248052|8|1|Additional 20% discount applied for our Overstock|Y
01|248052|8|2|Promotion.  Once a Purchase Order has been received|Y
01|248052|8|3|this item cannot be cancelled or returned.|Y
01|248055|1|1|BMT75 C5 Live Tool - BMT75-C5Z-ICE.|Y
01|248055|1|2|Please allow 10 weeks for design & manufacturing after|Y
01|248055|1|3|approval drawing and 2 weeks for delivery. These are|Y
01|248055|1|4|non-standard stock and considered special. Once PO or|Y
01|248055|1|5|order is issued these can't be cancelled or returned.|Y
01|248066|1|1|Referenced RT SN#6018|Y
01|248066|1|2|Match w/YM9534009C. Drawing#TCA-59049|Y
01|248066|1|3|Honda/OKK color (Green)|Y
01|248066|1|4|4.5 - 5 Months Manufacturing in Japan+ship to USA Boat|Y
01|248066|1|5|Pricing is Net Price|Y
01|248069|3|1|this does not make since|Y
01|248073|2|1|Quoted at NET price.|Y
01|248080|2|1|Please note additional 20% applied per overstock promo.|Y
01|248080|2|2|These are non-standard stock and considered special.|Y
01|248080|2|3|Once PO/order issued these cannot be cancelled or|Y
01|248080|2|4|returned.|Y
01|248082|1|1|Quoted at NET price.|Y
01|248082|2|1|Quoted at NET price.|Y
01|248084|1|1|Delivery: 30 pcs in stock|Y
01|248084|1|2|Remaining 70 pcs: 3 Months|Y
01|248084|2|1|Delivery: 11 pcs in stock|Y
01|248084|2|2|10 pcs expected 5/10|Y
01|248084|2|3|Remaining 79 pcs: 2 Months|Y
01|248089|2|1|Final Part# CAT50-AF1-30-OH **NET PRICE**|Y
01|248089|2|2|Custom Back Spot Facing Tool - MAIN BODY - TOOL#1|Y
01|248089|3|1|Final Part# BF130-22.23-35.51-59.31C  **NET PRICE**|Y
01|248089|3|2|Custom Back Spot Facing Tool - ARBOR - Tool#1|Y
01|248089|4|1|Final Part# 9BF130-22.23-35.51-59.31C-I  **NET PRICE**|Y
01|248089|4|2|Custom Back Spot Facing Tool - BYTE - Tool#1|Y
01|248089|4|3|Min Order QTY: 3pcs|Y
01|248089|5|1|Insert for Tool#1 Min Order Qty: 10 pcs|Y
01|248089|8|1|Final Part# CAT50-AF1-30-OH **NET PRICE**|Y
01|248089|8|2|Custom Back Spot Facing Tool - MAIN BODY - TOOL#2|Y
01|248089|9|1|Final Part# BF130-22.23-46.2-58.32C  **NET PRICE**|Y
01|248089|9|2|Custom Back Spot Facing Tool - ARBOR - Tool#2|Y
01|248089|10|1|Final Part# 9BF130-22.23-46.2-58.32C-I  **NET PRICE**|Y
01|248089|10|2|Custom Back Spot Facing Tool - BYTE - Tool#2|Y
01|248089|10|3|Min Order QTY: 3 pcs|Y
01|248089|11|1|Insert for Tool#2 Min Order QTY: 10 pcs|Y
01|248089|14|1|Final Part# CAT50-AF1-30-OH **NET PRICE**|Y
01|248089|14|2|Custom Back Spot Facing Tool - MAIN BODY - TOOL#3|Y
01|248089|15|1|Final Part# BF130-22.23-46.2-71.76C **NET PRICE**|Y
01|248089|15|2|Custom Back Spot Facing Tool - ARBOR - Tool#3|Y
01|248089|16|1|Final Part# 9BF130-22.23-46.2-71.76C-I **NET PRICE**|Y
01|248089|16|2|Custom Back Spot Facing Tool - BYTE - Tool#3|Y
01|248089|16|3|Min Order Qty: 3 pcs|Y
01|248089|17|1|Insert for Tool#3 Min Order QTY: 10pcs|Y
01|248089|20|1|Final Part# CAT50-AF1-30-OH **NET PRICE**|Y
01|248089|20|2|Custom Back Spot Facing Tool - MAIN BODY - TOOL#4|Y
01|248089|21|1|Final Part# BF130-25.4-52.81-59.64C **NET Price**|Y
01|248089|21|2|Custom Back Spot Facing Tool - ARBOR - Tool#4|Y
01|248089|22|1|Final Part# 9BF130-25.4-52.81-59.64C-I **NET PRICE**|Y
01|248089|22|2|Custom Back Spot Facing Tool - BYTE - Tool#4|Y
01|248089|22|3|Min Order QTY: 3 pcs|Y
01|248089|23|1|Insert for Tool#4 Min Order QTY: 10 pcs|Y
01|248089|26|1|Final Part# CAT50-AF1-30-OH **NET PRICE**|Y
01|248089|26|2|Custom Back Spot Facing Tool - MAIN BODY - TOOL#5|Y
01|248089|27|1|Final Part# BF130-25.4-55.85-62.33C **NET Price**|Y
01|248089|27|2|Custom Back Spot Facing Tool - ARBOR - Tool#5|Y
01|248089|28|1|Final Part# 9BF130-25.4-55.85-62.33C-I **NET PRICE**|Y
01|248089|28|2|Custom Back Spot Facing Tool - BYTE - Tool#5|Y
01|248089|28|3|Min Order QTY: 3 pcs|Y
01|248089|29|1|Insert for Tool#5 Min Order QTY: 10 pcs|Y
01|248098|1|1|WE NEED TO KNOW IF THE CUSTOMER NEEDS THE DRIVE PINS.|N
01|248098|2|1|WE NEED TO KNOW IF THE CUSTOMER NEEDS THE DRIVE PINS.|N
01|248104|23|1|LONGEST GL WE HAVE IS 120 - NO 150 FOR THE SK25|N
01|248109|1|1|Quoted for 1 to 9 tools.|Y
01|248109|2|1|Quoted for 10+ tools.|Y
01|248119|2|1|For 1 pc Overrun BCV50-C6-3OHA in stock.|Y
01|248119|2|2|Special one-time NET pricing|Y
01|248119|5|1|**NET Price** Special - cannot be cancelled or returned|Y
01|248119|6|1|**NET Price** Special - cannot be cancelled or returned|Y
01|248119|7|1|**NET Price** Special - cannot be cancelled or returned|Y
01|248124|6|1|Delivery: 2 pcs in stock rest 3~3.5 months|Y
01|248128|1|1|CNC202LYA-M|Y
01|248128|1|2|Rotary Table 200mm|Y
01|248140|1|1|Currently eight (8) in stock in Illinois balance of|Y
01|248140|1|2|two (2) estimated lead time is early/mid May.|Y
01|248144|22|1|Currently 14 in stock in Illinois.  Estimated lead time|Y
01|248144|22|2|for the balance of two (2) would be 1~2 weeks after|Y
01|248144|22|3|receipt of an order.|Y
01|248145|1|1|Quoted at NET price.|Y
01|248163|1|1|INS Req'd. Closed holes by Araldite.|Y
01|248163|2|1|T/P Inspection Required|Y
01|248163|3|1|T/P Inspection Required|Y
01|248169|1|1|Stock @ Factory our next cutoff date is 04/17 for|Y
01|248169|1|2|ETA to L-N beginning of May.|Y
01|248175|1|1|Special non-standard stock - cannot be cancelled or|Y
01|248175|1|2|returned after receipt of PO|Y
01|248185|1|1|Includes external cables|Y
01|248185|2|1|Includes external cables|Y
01|248186|1|1|HSK50E-C20-95G|Y
01|248190|3|1|16 Scroll Chuck and adapter|Y
01|248192|1|1|Fixture plate for 4 each SK adapters. True Precision|Y
01|248192|1|2|will approve the final drawing. Once the drawing is|Y
01|248192|1|3|approved 8 weeks to MFG|Y
01|248200|1|1|**NET PRICE** Special - non-cancellable/non-returnable|Y
01|248207|1|1|CAT40-SF5-80CP|Y
01|248207|7|1|CAT40-SF14-130CP|Y
01|248207|9|1|CAT40-SF18-130CP|Y
01|248230|1|1|2 in stock and balance is pending.|Y
01|248236|1|1|Special - non-cancellable / non-returnable|Y
01|248248|3|1|NBT40 DualContact Shell Mill Holder 27 mm|Y
01|248248|3|2|NB4001-27-50CP|Y
01|248248|3|3|Minimum Order Quantity: 2 units|Y
01|248272|1|1|Includes Power and Feedback cables from the nikken|Y
01|248272|1|2|Table to the machine bulkhead|Y
01|248272|2|1|Includes power and feedback cables from the Nikken|Y
01|248272|2|2|Table to the machine bulkhead|Y
01|248273|1|1|HSK80A shrink fit with 20mm ID & 32mm OD on nose...|Y
01|248273|1|2|Top of the taper to be 36mm & 250mm GL|Y
01|248276|2|1|Normal installation cost is $14500 NET per machine.|Y
01|248276|2|2|Special pricing offered based on two install trips|Y
01|248276|2|3|two machines installed per trip.|Y
01|248279|1|1|B5001-1000-6.00CP but with a diameter of 2.750|Y
01|248279|2|1|B5001-0750-6.00CP d but with a diameter of  1.800|Y
01|248292|1|1|BELOW IS A SPECIAL PACKAGE TO SUPPORT YOUR|Y
01|248292|1|2|PROJECT REQUIREMENTS AT FORGELINE MOTORSPORTS.|Y
01|248292|1|3|PACKAGED WITH OUR MOST COMMON HOLDERS AND ACCESSORIES|Y
01|248292|1|4|SELL AS PROPOSED. THANKS! -DANA|Y
01|248292|1|5|4/22/26 - segregated shipments to 249001|Y
01|248292|2|1|SF-START2-UNIT-200 DEMO UNIT S#2J0108|Y
01|248292|2|2|CONSIGNMENT UNIT. RSR TRANSFER TO FORGELINE|Y
01|248292|2|3|INCLUDES GLOVES HSK63 POTS SPRING SET|Y
01|248292|2|4|208VAC 3PHASE. 40AMP CIRCUIT REQUIRED. 90PSI AIR|Y
01|248292|2|5|SUPPLY REQUIRED FOR COOLING STATION.|Y
01|248295|1|1|Please note this is non-standard stock and considered|Y
01|248295|1|2|special. Once PO/order issued these can't be cancelled|Y
01|248295|1|3|or returned.|Y
01|248298|4|1|20 3-jaw self centering scroll chuck with adapter|Y
01|248298|4|2|plate|Y
01|248298|5|1|20 3-jaw self centering scroll chuck with adapter|Y
01|248298|5|2|plate.|Y
01|248300|1|1|RGA#TOR-62801/|Y
01|248300|1|2|Returning customer's CAT50-C1-1/4-105U-IDU|Y
01|248300|1|3|Customer declined repair|Y
01|248310|1|1|Part Number: TBD|Y
01|248310|1|2|Mimatic Part#: A203796|Y
01|248310|1|3|MAS-BT50 Mimatic adaptation of the torque arm.|Y
01|248310|1|4|*For reliable and rigid fixture onto the machine we|Y
01|248310|1|5|absolutely recommend a 3-pin support. Otherwise we|Y
01|248310|1|6|cannot give any warranty for stability stiffness and|Y
01|248310|1|7|accuracy.|Y
01|248310|1|8|A=110mm/d=18mm Tooling Interface ER32 collet system.|Y
01|248310|1|9|Delivery: 4 Weeks Drawing mfg 10-12 Weeks ADA|Y
01|248310|1|10|Lead time given as ADA - After Signed Drawing Apprvoal.|Y
01|248310|2|1|Quantity break for 2+ pcs|Y
01|248310|3|1|Part Number: TBD|Y
01|248310|3|2|Mimatic Part#: A203796 (3-Pin Adaptation)|Y
01|248310|3|3|MAS-BT50 Mimatic adaptation of the torque arm|Y
01|248310|3|4|Application and machine-specific adapated to the CNC|Y
01|248310|3|5|machine center. Included 3-Pin Support A=110/D=18mm|Y
01|248310|3|6|Cooling lubricant applied via the torque support|Y
01|248310|3|7|tooling interface for ER32 collet system.|Y
01|248310|3|8|Internal Coolant thru spindle and External thru pipes.|Y
01|248310|3|9|Delivery: 4 Weeks Dwg manufacturing 12-14 Weeks ADA|Y
01|248310|3|10|Lead time given as ADA - After Signed Drawing Approval.|Y
01|248310|4|1|Quantity break for 2+ pcs|Y
01|248316|1|1|Discontinued - non-cancellable non-returnable|Y
01|248342|1|1|Currently five (5) in stock in Illinois.  Additional|Y
01|248342|1|2|stock arriving week of 4/13 with more arriving the|Y
01|248342|1|3|week of 5/13.|Y
01|248342|2|1|Currently two (2) in stock in Illinois.  Additional|Y
01|248342|2|2|stock arriving week of 4/13.  We also have stock at the|Y
01|248342|2|3|factory.|Y
01|248347|1|1|**Additional one-time quantity discount applied**|Y
01|248360|1|1|New casting using old motors and cables|Y
01|248360|1|2|and motor covers.|Y
01|248361|1|1|300 MM Zero Point Base with 3 Zero Point Pods|Y
01|248361|1|2|Is quote is contingent of the machine tool builder|Y
01|248361|1|3|being able to run air to the Rotary Union|Y
01|248364|2|1|Please note additional 20% applied per overstock promo.|Y
01|248364|2|2|Once PO/order issued these cannot be cancelled or|Y
01|248364|2|3|returned.|Y
01|248376|7|1|Model 650W 6'' DIA Coolant-thru Air Chuck|Y
01|248376|7|2|AIR TUBE-107518-GENERIC|Y
01|248376|7|3|MANUAL VALVE STD 109755|Y
01|248376|7|4|Special adapter to interface Northfield Model 600|Y
01|248376|7|5|ROUGHING PLATE 600 SJ 108854|Y
01|248390|1|1|Set is currently out of stock on Item # ET20-168.|Y
01|248390|1|2|Estimated delivery is mid/end of May.|Y
01|248408|7|1|Okuma BMT60 Boring bar holder C4|Y
01|248413|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|248413|2|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|248413|3|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|248413|4|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|248414|1|1|RGA#TOR-62903/|Y
01|248414|1|2|Repair of 1 CAT50-C1.1/4-105U-IDU|Y
01|248414|1|3|1 CAT50-C1.1/4-105U-IDU found to be unrepairable|Y
01|248414|6|1|For unrepairable CAT50-C1.1/4-105U-IDU|Y
01|248414|6|2|Will be waived if a replacement is purchased|Y
01|248419|3|1|ZeroClamp Clamping Stud ZP120 25/M10 Two Piece Unit|Y
01|248419|3|2|Part #29580 ZP120 Stud|Y
01|248424|1|1|Ref Position 203|Y
01|248424|2|1|Ref Position 204|Y
01|248424|3|1|Ref Position 324|Y
01|248424|4|1|Ref Position 350|Y
01|248424|5|1|Ref Position 364|Y
01|248445|1|1|Currently 17 in stock in Illinois.  Estimated lead time|Y
01|248445|1|2|for balance is 6~8 Weeks after receipt of an order.|Y
01|248448|7|1|Quoted at Net price.|Y
01|248458|1|1|Estimated lead time is 6~8 weeks after receipt of an|Y
01|248458|1|2|order.  Price includes a case and wrenches.|Y
01|248458|1|3|We will need to have the angle head questionnaire|Y
01|248458|1|4|filled out before we will ship the order.|Y
01|248458|2|1|Estimated lead time is 3~5 weeks after design approval.|Y
01|248459|2|1|*Replaces VPA.0620.DC|Y
01|248461|1|1|Discontinued - cannot be cancelled or returned|Y
01|248471|3|1|Please note these are non-standard stock and considered|Y
01|248471|3|2|special. Once PO/order issued these can't be cancelled|Y
01|248471|3|3|or returned.|Y
01|248483|1|1|FOR NOMURA DST-40L MITS M80 CONTROL|Y
01|248483|1|2|GOSIGER TO INSTALL AND PROVIDE DRIVE AND CABLE SET.|Y
01|248483|1|3|L-N TO PROVIDE TABLE AND MOTOR ONLY.  PLEASE PROVIDE|Y
01|248483|1|4|ELECTRICAL SCHEMATIC FOR MACHINE AT TIME OF ORDER.|Y
01|248483|1|5|RIGHT SIDE MOUNT - A-AXIS CONFIG.|Y
01|248483|3|1|MACHINE INSTALLATION KIT.|Y
01|248483|3|2|INCLUDES DRIVE CABLES INSTALLATION HARDWARE|Y
01|248483|3|3|TOOL BALANCE. INSTALLATION BY GOSIGER|Y
01|248483|3|4|MACHINE E-PLAN REQUIRED AT TIME OF ORDER.|Y
01|248483|4|1|SHIP WORK HOLDING WITH ROTARY TABLE|Y
01|248483|5|1|NET COST = 2040.00; QT#9607|N
01|248483|5|2|Quoted by Mike Martin to DanaS.|N
01|248483|5|3|MARTIN TRUNNION L-N CNC202 SHELF S1 UNIT...|Y
01|248483|5|4|PREPPED WITH CENTER LOCATING BOSS P80Z MOUNTING|Y
01|248483|5|5|PATTERN.|Y
01|248485|1|1|We will need to have the angle head questionnaire|Y
01|248485|1|2|filled out before we will ship the order.|Y
01|248485|4|1|Lead time is 3~5 days after design approval.|Y
01|248507|1|1|Quoted at NET pricing|Y
01|248549|1|1|THIS PACKAGE REPRESENTS FOUNDATION BASE TO SUPPORT|Y
01|248549|1|2|QUICK CHANGE OF CUSTOMER TOOLING LIKE PALLETS OR|Y
01|248549|1|3|PROPOSED PYRAMID IN OUR CASE. +-.0001 REPEATABILITY|Y
01|248549|1|4|PACKAGE TAILORED FOR MAZAK VC-EZ20X 5-AXIS|Y
01|248549|1|5|FOR STILLWATER (NDA ACTIVE)|Y
01|248549|7|1|CUSTOM JAW SET FOR M120 SERIES VISE. PER OP10 JAW|Y
01|248549|7|2|CONCEPT. 4130 STEEL ALLOY OR SIMILAR. SOLD IN PAIRS|Y
01|248549|7|3|6-8 WEEK LEADTIME FROM DRAWING APPROVAL.|Y
01|248559|1|1|Currently one (1) of 018-018 in stock; estimated lead|Y
01|248559|1|2|time for additional is end of May/early June.|Y
01|248559|1|4|For the 018-046 we do not have stock and estimated|Y
01|248559|1|5|lead time is end of June/early July.|Y
01|248562|1|1|Estimated delivery is 8~10 weeks after receipt of an|Y
01|248562|1|2|order.|Y
01|248563|5|1|special- included in price of purchase or RT|Y
01|248567|1|1|160-068 (16C Round Collet 1.1/16) is currently out|Y
01|248567|1|2|of stock. Estimated lead time is 8~10 weeks after|Y
01|248567|1|3|receipt of an order.|Y
01|248569|7|1|Estimated delivery early/mid May if an order is placed|Y
01|248569|7|2|by April 24th.  If ordered after this date estimated|Y
01|248569|7|3|lead time will be end May/early June.|Y
01|248569|12|1|HSK100A-2000-6.00|Y
01|248569|12|2|Minimum Order Quantity is 10 pieces.  Delivery is|Y
01|248569|12|3|30~32 weeks after receipt of an order.  Customer must|Y
01|248569|12|4|accept +/- 10% overrun/underrun for orders of 10 pieces|Y
01|248569|12|5|should it occur.  At that time a revised PO|Y
01|248569|12|6|will be requested.  The holder is special non-standard|Y
01|248569|12|7|stock.  Once a Purchase Order has been received they|Y
01|248569|12|8|cannot be cancelled or returned.|Y
01|248569|12|9|QUOTED AT NET PRICING|Y
01|248569|13|1|Currently 2 in stock in Illinois.  Estimated lead time|Y
01|248569|13|2|on balance is mid/end May.|Y
01|248569|21|1|HSK100A-SK25C-200|Y
01|248569|21|2|This item is special non-standard stock.  Once a|Y
01|248569|21|3|Purchase Order is received this item cannot be|Y
01|248569|21|4|cancelled or returned.|Y
01|248569|36|1|ET40-323 -367 -437 & -652 are out of stock.|Y
01|248569|36|2|Estimated lead time is mid/end of June after receipt of|Y
01|248569|36|3|an order.|Y
01|248574|1|1|NBT50-FMA50.8-45|Y
01|248574|1|2|NBT50 Dual Contact Shell Mill Holder 50.8mm. GL45mm|Y
01|248574|1|3|Disocunt 50% same as T.C. for Turnkey. New machine.|Y
01|248574|1|4|Current delivery 2 weeks upon PO. Subject to change|Y
01|248574|2|1|NBT50-FMA47.625-75|Y
01|248574|2|2|NBT50 Dual Contact Shell Mill Holder 47.625mm. GL75mm|Y
01|248574|2|3|Discount 50% same as T.C. for Turnkey. New Machine|Y
01|248574|2|4|Current delivery 2 weeks upon PO. Subject to change.|Y
01|248578|1|1|SN:10362 EU:Ahrest Wilmington Corp|Y
01|248578|1|2|RGA#TAR-62895 CNC180BFA|Y
01|248580|1|1|Pais de orgien: Coracia|Y
01|248580|2|1|Pais de Origen: Taiwan|Y
01|248580|3|1|Pais de Origen: Japon|Y
01|248580|4|1|Pais de Origen: Japon|Y
01|248580|5|1|Pais de Origen: Japon|Y
01|248580|6|1|Pais de Origen: Japon|Y
01|248580|8|1|Pais de Origen: Japon|Y
01|248580|9|1|Pais de Origen: Japon|Y
01|248580|10|1|Pais de Origen: Japon|Y
01|248580|11|1|Pais de Origen: Japon|Y
01|248580|12|1|Pais de Origen: Japon|Y
01|248580|18|1|Pais de Origen: Japon|Y
01|248580|19|1|Pais de Origen: Japon|Y
01|248585|1|1|P/N: TBD|Y
01|248585|1|2|5C special collet with ID Bore to be ground to .190|Y
01|248592|1|1|TNKQ2604-0495 0003|Y
01|248592|3|1|TNKQ2604-0495 0004 - please note this is considered|Y
01|248592|3|2|special. Once PO/order issued these can't be cancelled|Y
01|248592|3|3|or returned.|Y
01|248593|3|1|COST INCLUDES MOTOR/GEARBOX @ WIRING TO MAKE CNC202|Y
01|248593|3|2|FUNCTION ON NEW MAKINO PS VMC.|Y
01|248593|3|4|COST ALSO INCLUDES LABOR & TRAVEL EXPENSE FOR L-N|Y
01|248593|3|5|SERVICE TECHNICIAN|Y
01|248603|1|1|Estimated delivery is end of May.|Y
01|248605|8|1|650W Model 650W 6'' DIA Coolant-thru Air Chuck|Y
01|248605|8|2|AIR TUBE-107518-GENERICMANUAL VALVE STD 109755|Y
01|248605|8|3|Special adapter to interface Northfield Model 600 serie|Y
01|248605|8|4|Air Filter/Regulator/Lubricator unit. Standard size|Y
01|248605|8|5|Model 600 Series Top Jaw Roughing Fixture Plate|Y
01|248605|8|6|Set of (3) ST-1-6-11/2 Standard Steel Jaw Blanks|Y
01|248605|8|7|104335-1W-FIN BUSHING CENTER|Y
01|248608|1|1|SN:XXXX EU:Ahresty Wilmington Corp|Y
01|248608|1|2|RGA#TAR-62896 CNC180BFA|Y
01|248622|1|1|Installation not included.|Y
01|248622|1|2|Thomas Skinner is responsible for rotary table to|Y
01|248622|1|3|machine fit.|Y
01|248622|1|4|Application of the rotary table and work preformed.|Y
01|248622|1|5|Installation and any items required.|Y
01|248622|2|1|Pending|Y
01|248624|1|1|Special - non-cancellable non-returnable|Y
01|248624|2|1|Special - non-cancellable non-returnable|Y
01|248627|1|1|BT30-SK13-75 with J-nut SKN-13BJ and ID chip hole|Y
01|248627|1|2|BT30-SK13-75-J-IDU|Y
01|248627|3|1|BT30-SK16-75 with J-nut SKN-16BJ and ID chip hole|Y
01|248627|3|2|BT30-SK16-75-J-IDU|Y
01|248639|1|1|AV0000103|Y
01|248639|1|2|BIS-C-122-04/L installed and holder re-balanced.|Y
01|248642|1|1|IMTS Consignment to be sold with the machines after the|Y
01|248642|1|2|show.|Y
01|248649|1|1|Pais de orgien: Coracia|Y
01|248649|2|1|Pais de Origen: Taiwan|Y
01|248649|3|1|Pais de Origen: Japon|Y
01|248649|4|1|Pais de Origen: Japon|Y
01|248649|5|1|Pais de Origen: Japon|Y
01|248649|6|1|Pais de Origen: Japon|Y
01|248649|7|1|Pais de Origen: Taiwan|Y
01|248649|8|1|Pais de Origen: Japon|Y
01|248649|9|1|Pais de Origen: Japon|Y
01|248649|10|1|Pais de Origen: Japon|Y
01|248649|11|1|Pais de Origen: Japon|Y
01|248649|12|1|Pais de Origen: Japon|Y
01|248649|13|1|Pais de Origen: Taiwan|Y
01|248649|14|1|Pais de Origen: Japon|Y
01|248649|15|1|Pais de Origen: Japon|Y
01|248649|16|1|Pais de Origen: Japon|Y
01|248649|17|1|Pais de Origen: Japon|Y
01|248649|18|1|Pais de Origen: Japon|Y
01|248649|19|1|Pais de Origen: Japon|Y
01|248649|20|1|Pais de Origen: Japon|Y
01|248649|21|1|Pais de Origen: Japon|Y
01|248649|22|1|Pais de Origen: Japon|Y
01|248654|1|1|Special Net price with standrd SK Nut.|Y
01|248654|6|1|Drill shank size unknown as if 1/4|Y
01|248654|7|1|If Jet Slot Coolant is requested.|Y
01|248654|7|2|Drill shank size unknown as if 1/4|Y
01|248654|8|1|If cap for coolant through type is requested.|Y
01|248654|8|2|Drill shank size unknown as if 1/4|Y
01|248654|9|1|Pin Face Wrench can be utilized for both of J Coolant|Y
01|248654|9|2|and coolant through types.|Y
01|248656|1|1|Part Number: C5001-22-100CP|Y
01|248656|2|1|C5001-22-150CP|Y
01|248658|6|1|Part Number: NBT40-C16-60|Y
01|248658|6|2|NBT40 DualContact Milling Chuck 16mm 8K|Y
01|248658|16|1|Part Number: NBT40-SK20C-60|Y
01|248659|1|1|No Inspection Required|Y
01|248661|3|1|Old #OKU-L370X >> OK101-14000|Y
01|248661|4|1|Old #OKU-L370MW-MN >> OK109-13001|Y
01|248661|5|1|Old #OKU-L370MW-DB >> OK109-15001|Y
01|248661|8|1|Replacement for FK-8|Y
01|248663|1|1|with standrd SK Nut.|Y
01|248663|6|1|Drill shank size unknown as if 1/4|Y
01|248663|7|1|If Jet Slot Coolant is requested.|Y
01|248663|7|2|Drill shank size unknown as if 1/4|Y
01|248663|8|1|If cap for coolant through type is requested.|Y
01|248663|8|2|Drill shank size unknown as if 1/4|Y
01|248663|9|1|Pin Face Wrench can be utilized for both of J Coolant|Y
01|248663|9|2|and coolant through types.|Y
01|248676|1|1|Nikken # RRSS-6.3F-DLC Carbide Radical Mill Reamer|Y
01|248676|1|2|R/H Helical for Blind Hole w/DLC Coating|Y
01|248676|1|3|Quoted 1~4 Reamers at NET price.|Y
01|248676|2|1|Nikken # RRSS-9.5F-DLC Carbide Radical Mill Reamer|Y
01|248676|2|2|R/H Helical for Blind Hole w/DLC Coating|Y
01|248676|2|3|Quoted 1~4 Reamers at NET price.|Y
01|248678|1|1|Currently we are out of stock however there are two|Y
01|248678|1|2|due in by end of the month.  When these are purchased|Y
01|248678|1|3|there is another shipment coming in around mid/end June|Y
01|248693|5|1|Final Sale-Non-cancellableNon-returnable|Y
01|248693|5|2|Quoted at NET pricing|Y
01|248696|1|1|Includes table with motor and short cables|Y
01|248697|5|1|Final Sale-Non-cancellableNon-returnable|Y
01|248697|5|2|quoted at NET Pricing|Y
01|248697|6|1|Final Sale-Non-cancellableNon-returnable|Y
01|248697|6|2|Quoted at NET pricing|Y
01|248719|1|1|Old #OKU-L370MW-DB|Y
01|248724|1|1|Pratt & Whitney PT712226 tooling and packaging must|Y
01|248724|1|2|be etched before shipping.|Y
01|248726|1|1|Price is for the current stock only subject to change.|Y
01|248726|1|2|Price is Net price.|Y
01|248733|1|1|SPLY for PO#62939/5AX-201FA-M-RCN-2RJ(Ellison/GE Avi)|Y
01|248733|1|2|4/16RY:LY-2863(4/22~24A)|N
01|248746|1|1|FOR EXISTING HWACHEON VESTA 660 VMC.|Y
01|248746|1|2|ALREADY EQUIPPED WITH 2020 CNCZ105FA-M TABLE / 5C|Y
01|248746|1|3|REUSE EXISTING DRIVE AND CABLES. aI-4 MOTOR?|Y
01|248746|1|4|CUSTOMER TO SUPPLY CUSTOM TOOLING COLUMN OR TRUNNION.|Y
01|248746|1|5|M&E TO PROVIDE INSTALLATION LABOR|Y
01|248752|11|1|Quoted at NET price.|Y
01|248753|3|1|POSITIONING BLOCK FOR HAAS MACHINE OR MAZAK MACHINE|Y
01|248757|1|1|HG-154T motor but need to match encoder to machine.|Y
01|248757|4|1|Installation hardware components only.|Y
01|248775|1|1|RGA#LVR-62940/|Y
01|248775|1|2|Sending customer's BMT65-ER32Z-MS SN:25904295 01|Y
01|248775|1|3|(Mim#186493) Too tight to turn manually generating|Y
01|248775|1|4|excessive heat.|Y
01|248778|1|1|NET Pricing|Y
01|248778|3|1|NET Pricing|Y
01|248778|5|1|NET PRICING - Stock at Factory - Air Shipment 2 week|Y
01|248778|5|2|A.R.O|Y
01|248778|7|1|NET Pricing|Y
01|248778|9|1|Mazak C700 Base Plate w/Cover Sheet|Y
01|248778|9|2|NET PRICING|Y
01|248778|9|3|Manufacure 8 Weeks + 2 Weeks Air Shipment|Y
01|248778|9|4|Non Cancelable Non Returnable : 20% Deposit with order|Y
01|248778|11|1|ZLOX Base Plate + Riser 125mm. For a WH-ZLOX-P80Z with|Y
01|248778|11|2|pull studs at 200mm pitch|Y
01|248781|5|1|NET PRICING|Y
01|248781|9|1|Mazak C700 Base Plate w/Cover Sheet|Y
01|248781|9|2|Non Cancelable Non Returnable 20% Deposit with order|Y
01|248781|11|1|ZLOX Base Plate + Riser 125mm. For a WH-ZLOX-P80Z|Y
01|248781|11|2|with pull studs at 200mm pitch|Y
01|248782|1|1|Custom Tool - cannot be cancelled or returned upon|Y
01|248782|1|2|receipt of a PO|Y
01|248782|1|3|**NET PRICE**|Y
01|248783|5|1|NET PRICING|Y
01|248783|9|1|Mazak C700 Base Plate w/Cover Sheet|Y
01|248783|9|2|Non Cancelable Non Returnable 20% Deposit with order|Y
01|248783|11|1|ZLOX Base Plate + Riser 125mm. For a WH-ZLOX-P80Z|Y
01|248783|11|2|with pull studs at 200mm pitch|Y
01|248785|5|1|NET PRICING|Y
01|248785|9|1|Mazak C700 Base Plate w/Cover Sheet|Y
01|248785|9|2|Non Cancelable Non Returnable 20% Deposit with order|Y
01|248785|11|1|ZLOX Base Plate + Riser 125mm. For a WH-ZLOX-P80Z|Y
01|248785|11|2|with pull studs at 200mm pitch|Y
01|248802|1|1|8-10Wks|Y
01|248809|3|1|USE MANUAL 96MM ROCK LOCK BASEPLATE WITH ABOVE|Y
01|248809|9|1|MARTIN TRUNNION L-N CNC202 SHELF S1 UNIT...|Y
01|248809|9|2|PREPPED WITH CENTER LOCATING BOSS P80Z MOUNTING|Y
01|248809|9|3|PATTERN. IF A MANUAL BASE IS REQUIRED PLEASE ADVISE|Y
01|248809|9|4|NET COST = 2040.00; QT#9607|N
01|248823|1|1|IF 4 IS CRITICAL WE CAN PROVIDE CAT40-ER16-4.00 &|Y
01|248823|1|2|HI-TORQUE BEARING NUT SWAP FOR SAME PRICE|Y
01|248823|3|1|ER32 WAS CHOSEN BECAUSE OF GAGE LENGTH = 3.14|Y
01|248823|7|1|ALTERNATE FOR 15/64|Y
01|248823|19|1|NEW HAAS VMC|Y
01|248826|1|1|didifididf dudifudiu duifuid uisdufiu isidfui isuiudfiu|Y
01|248826|1|2|dfoduo douofuod uou                                  do|Y
01|248826|1|3|1-5 pcs: $80.00|Y
01|248828|8|1|ALTERNATE FOR 2.5 GL|Y
01|248828|9|1|Quoted at NET pricing|Y
01|248828|9|2|Non-returnable non-cancellable|Y
01|248829|1|1|SN:10272 EU:Aisin NC|Y
01|248829|1|2|RGA#TAR-62856 CNC401LFA(11+1RJ)|Y
01|248836|1|1|SN:4239 EU:Nidec OKK|Y
01|248836|1|2|RGA#TAR-62799 5AXZ-350FA-RCN+RU-RJ6|Y
01|248856|1|1|SN:4239 EU:Nidec OKK|Y
01|248856|1|2|RGA#TAR-62799 5AXZ-350FA-RCN+RU-RJ6|Y
01|248858|1|1|Includes 6 holders at no cost with SF machine|Y
01|248858|1|2|Pais de Origen: Francia|Y
01|248858|2|1|Pais de Origen: Croacia|Y
01|248858|3|1|Pais de Origen: Croacia|Y
01|248858|4|1|Pais de Origen: Croacia|Y
01|248858|5|1|Pais de Origen: Croacia|Y
01|248858|6|1|Pais de Origen: Croacia|Y
01|248858|7|1|Pais de Origen: Croacia|Y
01|248860|6|1|Quoted at NET price.|Y
01|248862|6|1|Quoted at NET price.|Y
01|248864|6|1|Quoted at NET price.|Y
01|248870|1|1|Fixture plate for 4 each SK adapters. True Precision|Y
01|248870|1|2|will approve the final drawing. Once the drawing is|Y
01|248870|1|3|approved 8 weeks to MFG|Y
01|248870|3|1|300 MM Zero Point Base with 3 Zero Point Pods|Y
01|248870|3|2|Is quote is contingent of the machine tool builder|Y
01|248870|3|3|being able to run air to the Rotary Union|Y
01|248870|5|1|part# F100.25-SK16-97|Y
01|248870|5|2|Flange mount style SK16 adapter|Y
01|248870|5|3|Special-can not be cancelled or returned.|Y
01|248872|1|1|RGA#TAR-62919 5AX-201FA-M-AB|Y
01|248872|1|2|Transfer of customer's components to Lyndex-Nikken's|Y
01|248872|1|3|loaner table to be sold to customer.|Y
01|248878|2|1|Overstock promotional 20% extra added to the discount|Y
01|248878|2|2|on above toolholder.|Y
01|248878|2|3|This item ins non-returnable.|Y
01|248879|1|1|This includes motor and cable|Y
01|248879|1|2|Pais de Origen Japon|Y
01|248884|1|1|40 currently in stock ready to ship. Please allow 10|Y
01|248884|1|2|weeks for manufacturing and delivery of remaining|Y
01|248884|1|3|pieces.|Y
01|248886|1|1|**non-cancellable non-returnable**|Y
01|248887|2|1|hold 6.35mm|Y
01|248891|1|1|WE ONLY OFFER HYDRAULIC IN DUAL CONTACT.|Y
01|248891|1|2|SK SURPASSES GRIPPING TORQUE LONGEVITY DURABILITY|Y
01|248891|1|3|FLEXIBILITY AND COST WITH DIAMETERS OF 3/8 OR LESS|Y
01|248891|1|4|THIS IS WHY L-N STOCKS LIMITED AMOUNTS OF HC CHUCKS.|Y
01|248892|6|1|Quoted at NET price.|Y
01|248894|6|1|Quoted at NET price|Y
01|248896|1|1|Additional 20% Overstock Promo discount applied.|Y
01|248896|1|2|Non-cancellable non-returnable|Y
01|248896|2|1|Applicable for B4015-0625-4.00DIN only|Y
01|248896|4|1|Final Part# B4006-0625-4.00DIN-M  **NET PRICE**|Y
01|248896|4|2|Custom special - cannot be cancelled or returned upon|Y
01|248896|4|3|receipt of a PO|Y
01|248897|2|1|Estimated lead time is end of May.|Y
01|248901|1|1|This tool is a complete special NON  returnable|Y
01|248905|4|1|Quoted at NET price.|Y
01|248916|1|1|Quoted at NET pricing|Y
01|248927|1|1|Addtional 20% discount added to standard 35% discount|Y
01|248927|1|2|Final Sale|Y
01|248933|1|1|Final Part# EZ-ACART-PREM-CRX20|Y
01|248933|1|2|**For Custom Application - cannot be cancelled or|Y
01|248933|1|3|returned upon receipt of order**|Y
01|248936|1|1|Quoted at NET price.|Y
01|248940|1|1|CNC401LFA-120-11+1PRJ. Match with SN#10272.|Y
01|248940|1|2|RotaryTable 400mm HydBrake Fanuc LeftMT w/o Motor 1/120|Y
01|248940|1|3|Delivery;|Y
01|248940|1|4|4 months for manufacturing at Japan factory|Y
01|248940|1|5|Shipping by boat from Japan (taking 1 - 1.5 months)|Y
01|248940|1|6|Showing Net price.|Y
01|248940|3|1|Support Table 400mm Face PlateHydBrake No-Slot|Y
01|248940|3|2|Special TAT-401N|Y
01|248940|3|3|pairing CNC401LFA-120-11+1PRJ as described above RT|Y
01|248940|3|4|Showing Net price.|Y
01|248940|3|5|Delivery to be the same as above described pairing RT.|Y
01|248947|3|1|Delivery: 1 week for PO placed 4/21 4Wks for PO placed|Y
01|248947|3|2|after|Y
01|248950|1|1|El precio incluye la instalacin y capacitacin.|Y
01|248955|1|1|Delivery: ETA ~5/20 for PO placed before 5/12|Y
01|248955|1|2|**non-cancellable non-returnable**|Y
01|248955|2|1|Delivery: ETA ~5/20 for PO placed before 5/12|Y
01|248955|2|2|**non-cancellable non-returnable**|Y
01|248955|3|1|Discontinued - non-cancellable non-returnable|Y
01|248959|1|1|Currently no stock in Illinois.  Estimated lead time|Y
01|248959|1|2|is the week of 5/11.|Y
01|248973|1|1|C4001-16-152.4CP|Y
01|248973|2|1|C4001-22-152.4CP|Y
01|248975|1|1|FOR MANUAL BORING MILL. CUSTOMER TO SUPPLY STOP|Y
01|248975|1|2|BLOCK AND THERE OWN RISER FOR W-AXIS.|Y
01|248975|2|1|OP MANUAL SUPPLIED|Y
01|248975|2|2|Requires SK10 collet ordered seperately|Y
01|248981|1|1|C4006-0750-3.00 with coolant port modification. These|Y
01|248981|1|2|are considered special and have been quoted at special|Y
01|248981|1|3|net price. Once PO/order issued these cannot be|Y
01|248981|1|4|cancelled or returned.|Y
01|249001|1|1|THIS QUOTE IS ALL ITEMS TO SHIP FROM CHICAGO|Y
01|249001|1|2|INVENTORY. 248292 IS A CONSIGNMENT TRANSFER FROM|Y
01|249001|1|3|EXISTING DEMO SITE TO FORGELINE MOTORSPORTS|Y
01|249036|2|1|LABOR AND TRAVEL EXPENSES FOR LYNDEX NIKKEN INSTALLER|Y
01|249036|3|1|INCLUDES AMPLIFER EXTERNAL POWER & FEEDBACK CABLES|Y
01|249036|3|2|INTERNAL ELETRICAL CABINET WIRING & ALL OTHER|Y
01|249036|3|3|NECESSARY HARDWARE. THIS CHARGE ALSO INCLUDES THE FEE|Y
01|249036|3|4|FOR FANUC SERVO AMPLIFIER TUNING WHICH IS REQUIRED|Y
01|249036|3|5|FOR ALL DIRECT DRIVE NIKKEN ROTARY TABLES|Y
01|249037|1|1|RGA#LVR-62900/|Y
01|249037|1|2|Repair of MZMP46-ER32Z-ICE SN:2190152002 (Mim#124854)|Y
01|249037|2|1|Bearings seals o-rings Input Spindle & Output|Y
01|249037|2|2|Spindle to be replaced.|Y
01|249041|1|1|APPLY TC#4725 FOR THIS ORDER.|Y
01|249041|1|2|INVOICE BALANCE TO ACCT# E8755|Y
01|249041|14|1|4725 ($2500)|Y
01|249047|1|1|R8 shell mill holder - 16mm ID 25mm GL.|Y
01|249047|1|2|These are considered special and have been quoted at|Y
01|249047|1|3|special net price. Please allow 8 weeks manufacturing|Y
01|249047|1|4|after signed approval drawing.|Y
01|249047|3|1|R8 shell mill holder - 22mm ID 25mm GL.|Y
01|249047|3|2|These are considered special and have been quoted at|Y
01|249047|3|3|special net price. Please allow 8 weeks manufacturing|Y
01|249047|3|4|after signed approval drawing.|Y
01|249049|2|1|Currently one (1) holder in stock in Illinois.|Y
01|249049|2|2|Estimated lead time for the balance is 10~12 weeks.|Y
01|249056|1|1|SN:4239 EU:Nidec OKK|N
01|249056|1|2|RGA#TAR-62799 5AXZ-350FA-RCN+RU-RJ6|N
01|249056|1|3|Total Net Price for Repair for the captioned RT Repair|Y
01|249056|1|4|on Tiliting Axis. Does not cover the scales.|Y
01|249060|2|1|Includes: HEIDENHAIN-RCN2391F +/-5 with mounting kit|Y
01|249067|1|1|install an existing 5AX-130FA-M on Mori NV5000.|Y
01|249067|1|2|Complete interface change and axis card addition.|Y
01|249070|1|1|Drawing WK-D-BT40-PG11-E|Y
01|249070|1|2|Price for one piece either Cat40 or BT40|Y
01|249070|2|1|Drawing WK-D-BT40-PG11-E|Y
01|249070|2|2|Minimum quantity order of 2 pcs.|Y
01|249070|3|1|Milling Disc 164413|Y
01|249078|1|1|-5-140 degree movement 3-port only.|Y
01|249078|3|1|A tariff surcharge may be added to this quotation in|Y
01|249078|3|2|the event of a sustained tariff increase on the|Y
01|249078|3|3|importation of this product.  Any surcharge will be|Y
01|249078|3|4|disclosed prior to acceptance of an order.|Y
01|249083|4|1|CAT40 1.1/4 Hydraulic Chuck 3 GL / CAT40-HC1250-3.00|Y
01|249083|4|2|Please allow 10 weeks for manufacturing after signed|Y
01|249083|4|3|approval drawing. These are considered special and have|Y
01|249083|4|4|been quoted at special net price. Once PO/order issued|Y
01|249083|4|5|these cannot be cancelled or returned. MOQ for this is|Y
01|249083|4|6|3 pieces.|Y
01|249083|6|1|NCAT40 1.1/4 Hydraulic Chuck 3 GL /|Y
01|249083|6|2|NCAT40-HC1250-3.00.|Y
01|249083|6|3|Please note these are considered special and have been|Y
01|249083|6|4|quoted at special net price. Once PO/order issued|Y
01|249083|6|5|these cannot be cancelled or returned.|Y
01|249099|1|1|AV000103   CAT50-C1.1/4-135UG-IDI|Y
01|249099|1|2|BIS-C-122-04/L installed and holder re-balanced.|Y
01|249107|1|1|**non-cancellable non-returnable item**|Y
01|249112|1|1|Includes indexer Nikken control with pendent with 15ft|Y
01|249112|1|2|cable M-code and power cable for the unit.|Y
01|249112|3|1|Tapered square fixture to match ID of parts.|Y
01|249112|3|2|Tapered square fixture mounted on MT3 center for|Y
01|249112|3|3|tailstock.|Y
01|249113|1|1|Fixture plate for 4 each SK adapters. True Precision|Y
01|249113|1|2|will approve the final drawing. Once the drawing is|Y
01|249113|1|3|approved 8 weeks to MFG|Y
01|249121|1|1|**non-cancellable non-returnable**|Y
01|249124|3|1|Additional 20% Overstock Promo discount applied|Y
01|249124|3|2|**non-cancellable non-returnable**|Y
01|249124|4|1|Applicable for N5006-0250-2.75 only|Y
01|249143|1|1|Includes power and feedback cables from the nikken|Y
01|249143|1|2|table to the machine bulkhead|Y
01|249155|1|1|This is a cross for Royal # 44727|Y
01|249155|3|1|This is a cross for Royal # 44223|Y
01|249155|5|1|This is a cross for Royal # 44235|Y
01|249159|1|1|5% ADDITIONAL DISCOUNT|N
01|249159|2|1|2 UNIT BUY = ADDITIONAL 10% OFF|N
01|249177|1|1|Placeholder for tooling package - list to come|Y
01|249184|1|1|C4001-16-152.4CP|Y
01|249184|2|1|C4001-22-152.4CP|Y
01|249187|1|1|FOR MAKINO F5 V270823 PRO6 FANUC W/ HIGH VOLTAGE|Y
01|249187|1|2|DRIVES AND MOTORS. ai8HV MOTORS|Y
01|249187|1|3|RIGHT SIDE TABLE MOUNT FACEPLATE CLOSEST TO OPERATOR|Y
01|249187|1|4|DOOR. OPTIONAL TAILSTOCK AND/OR SUPPORT PLATE WITH|Y
01|249187|1|5|INTEGRATED BRAKE. <<RECOMMENDED FOR FUTURE TRUNNION|Y
01|249187|1|6|WORK HOLDING LIKE TOMBSTONE OR DROP TRUNNION.|Y
01|249187|2|1|RETROFIT HIGH VOLTAGE MOTOR ai8HV.|Y
01|249187|3|1|INCLUDES INSTALLATION PER MAKINO ENG. DOCS.|Y
01|249187|3|2|RIGHT SIDE TABLE ENTRY Y-AXIS WIRE DUCT.|Y
01|249187|3|3|ADDITIONAL AXIS EXPANSION REQUIRED BY MAKINO.|Y
01|249187|3|4|QUOTE ACCORDINGLY.|Y
01|249202|1|1|Nikken# RRSS-6.3F-SPX-OH Carbide Radical Mill Reamer|Y
01|249202|1|2|Carbide radical mill reamer with oil hole / SPX coating|Y
01|249202|1|3|Quoted 1~4 Reamers at NET price.|Y
01|249202|2|1|Nikken# RRSS-9.5F-SPX-OH Carbide Radical Mill Reamer|Y
01|249202|2|2|Carbide radical mill reamer with oil hole / SPX coating|Y
01|249202|2|3|Quoted 1~4 Reamers at NET price.|Y
01|249202|4|1|Nikken# RRSS-6.3F-DLC-OH Carbide Radical Mill Reamer|Y
01|249202|4|2|Carbide radical mill reamer with oil hole / DLC coating|Y
01|249202|4|3|Quoted 1~4 Reamers at NET price.|Y
01|249202|5|1|Nikken# RRSS-9.5F-DLC-OH Carbide Radical Mill Reamer|Y
01|249202|5|2|Carbide radical mill reamer with oil hole / DLC coating|Y
01|249202|5|3|Quoted 1~4 Reamers at NET price.|Y
01|249202|7|1|Nikken# RXS-6.3F-DLC-OH Carbide Mill Reamer|Y
01|249202|7|2|Carbide mill reamer with oil hole / DLC coating|Y
01|249202|7|3|Quoted 1~4 Reamers at NET price.|Y
01|249202|8|1|Nikken# RXS-9.5F-DLC-OH Carbide Mill Reamer|Y
01|249202|8|2|Carbide mill reamer with oil hole / DLC coating|Y
01|249202|8|3|Quoted 1~4 Reamers at NET price.|Y
01|249204|3|1|MOTOR AND GEARBOX FOR ROTARY TO BE SWAPPED FROM|Y
01|249204|3|2|CONTROLLER UNIT TO FANUC FOR MAKINO INSTALLATION|Y
01|249206|5|1|Estimated lead time is 3~5 days after design approval.|Y
01|249206|5|2|This item is special and cannot be cancelled or|Y
01|249206|5|3|returned upon receipt of a Purchase Order.|Y
01|249206|5|4|QUOTED AT NET PRICING.|Y
01|249208|5|1|Estimated lead time is 3~5 days after design approval.|Y
01|249208|5|2|This item is special and cannot be cancelled or|Y
01|249208|5|3|returned upon receipt of a Purchase Order.|Y
01|249208|5|4|QUOTED AT NET PRICING.|Y
01|249209|1|1|Estimated lead time is 10~12 weeks after receipt of an|Y
01|249209|1|2|order.|Y
01|249219|2|1|Overstock discount additional 20% applied to your|Y
01|249219|2|2|standard 35% discounts|Y
01|249220|1|1|Drawing WK-D-BT40-PG11-E|Y
01|249220|1|2|Price for one piece either Cat40 or BT40|Y
01|249220|2|1|Drawing WK-D-BT40-PG11-E|Y
01|249220|2|2|Minimum quantity order of 2 pcs.|Y
01|249220|3|1|Milling Disc 164413|Y
01|249224|1|1|Drawing WK-D-BT40-PG11-E|Y
01|249224|1|2|Price for one piece either Cat40 or BT40|Y
01|249224|2|1|Drawing WK-D-BT40-PG11-E|Y
01|249224|2|2|Minimum quantity order of 2 pcs.|Y
01|249224|3|1|Milling Disc 164413|Y
01|249231|1|1|105MM thur hole|Y
01|249231|2|1|155MM thru hole|Y
01|249231|3|1|130MM thru hole|Y
01|249235|1|1|T/P Inspection Required|Y
01|249249|2|1|Core buy back promotion|Y
01|249253|2|1|USED sold as-is. Cannot be cancelled or returned.|Y
01|249255|1|1|Please note this is non-standard stock and considered|Y
01|249255|1|2|special. Once PO/order issued these can't be cancelled|Y
01|249255|1|3|or returned.|Y
01|249257|1|1|A06B-02223-B000|Y
01|249266|2|1|Overstock discount additional 20% applied to your|Y
01|249266|2|2|standard 35% discounts|Y
01|249267|1|1|SN:7405 EU:Ferrous Engineering & Tool|Y
01|249267|1|2|RGA#TAR-62830 5AX-201YA-M|Y
01|249275|1|1|For YCM JC16 VMC w/ Midaco twin trunnion APC|Y
01|249275|1|2|Table to ship to Midaco for assembly.|Y
01|249275|1|3|RT Installation to occur concurrently with Midaco or|Y
01|249275|1|4|right after. Please provide contact info at time of|Y
01|249275|1|5|order and host engineering review between all parties|Y
01|249275|1|6|Fanuc Oi-MF Plus control with standard LV motors|Y
01|249275|1|7|Fanuc Data Sheets required at time of order.|Y
01|249275|1|8|Table to be mounted per Midaco drawing on APC receiver.|Y
01|249275|1|9|That work by Midaco. L-N to provide long cable set|Y
01|249275|1|10|to support left side installation and proper entry|Y
01|249275|2|1|Supply Extended cable set.|Y
01|249275|2|2|See Midaco AS50SDTS layout.|Y
01|249281|1|1|160051|Y
01|249281|1|2|Polysaw-DeepMill holder Type 13|Y
01|249281|1|3|Dia. 25mm L1=105 L2=45 d1=21.6|Y
01|249281|1|4|Option 1|Y
01|249281|2|1|164433|Y
01|249281|2|2|Typ PS-G4013 Tinamatic-3 depth - max 9.2mm|Y
01|249281|2|3|No return no cancel|Y
01|249281|2|4|Option 1|Y
01|249281|3|1|160050|Y
01|249281|3|2|Polysaw-DeepMill holder Type11|Y
01|249281|3|3|Dia. 20 L=91 L1=40 d1=18.8|Y
01|249281|3|4|Option 2|Y
01|249281|4|1|164407|Y
01|249281|4|2|Polysaw insert D40x1.5 Z=24 BW|Y
01|249281|4|3|Typ PS-G4011 Tinamatic-3 depth - max 10.5mm|Y
01|249281|4|4|Option 2|Y
01|249283|2|1|Additional 20% discount applied for our Overstock|Y
01|249283|2|2|Promotion.  Once a Purchase Order has been received|Y
01|249283|2|3|this item cannot be cancelled or returned.|Y
01|249288|1|1|1st Batch|Y
01|249288|2|1|1st Batch|Y
01|249288|3|1|1st Batch|Y
01|249288|4|1|1st Batch|Y
01|249288|5|1|1st Batch|Y
01|249288|6|1|1st Batch|Y
01|249295|1|1|We currently have 41 in stock in Illinois.  The balance|Y
01|249295|1|2|is in stock at the factory.  Estimated lead time is|Y
01|249295|1|3|2~3 weeks after receipt of an order.|Y
01|249306|1|1|Delivery will be mid-June ARO|Y
01|249320|1|1|RGA#TAR-62865 SN:XXX|Y
01|249320|1|2|Lyndex-Nikken will provide loaner table while customer|Y
01|249320|1|3|sends theirs in for repair. Must return loaner within|Y
01|249320|1|4|5 days of repaired being shipped back. After that a|Y
01|249320|1|5|$100/day fee will be charged.|Y
01|249328|1|1|**non-cancellable non-returnable**|Y
01|249329|4|1|part# NBT50-SK25C-135P|Y
01|249349|1|1|CUSTOM PACKAGE FOR DEMO AND TEST CUTTING PURPOSES|Y
01|249349|1|2|PACKAGE LIST PRICE = $6642; SPEC. NET -danas|Y
01|249360|17|1|Alt for TQW-200|Y
01|249362|1|1|Calibration service and preventative maintenance on|Y
01|249362|1|2|E46LA Presetter SN:200190|Y
01|249362|2|1|On-Site Service Call ESTIMATE for Travel/Time/Labor|Y
01|249383|1|1|Discount reflects purchase of 1-3 holders.|Y
01|249383|2|1|Discount reflects purchase of 4-6 holders.|Y
01|249388|2|1|QUOTED AT NET PRICING.  Customer needs to complete the|Y
01|249388|2|2|Lathe Spindle Information Form and have our Engineering|Y
01|249388|2|3|Team review to be sure the QCC-PB65-A6 will work in|Y
01|249388|2|4|their machine.|Y
01|249400|1|1|Please note these are considered special and have been|Y
01|249400|1|2|quoted at special net price. Once PO/order issued|Y
01|249400|1|3|these cannot be cancelled or returned.|Y
01|249405|6|1|NC4001-32-50CP|Y
01|249405|6|2|NCAT40 DualContact Shell Mill Holder 32mm CoolantPorts|Y
01|249405|8|1|CAT40-SF12-120CP|Y
01|249405|8|2|CAT40 Shrink Fit Holder 12mm CoolantPorts 25K|Y
01|249405|9|1|CAT40-SF14-120CP|Y
01|249405|9|2|CAT40 Shrink Fit Holder 14mm CoolantPorts 25K|Y
01|249405|10|1|CAT40-SF16-120CP|Y
01|249405|10|2|CAT40 Shrink Fit Holder 16mm CoolantPorts 25K|Y
01|249405|11|1|CAT40-SF18-120CP|Y
01|249405|11|2|CAT40 Shrink Fit Holder 18mm CoolantPorts 25K|Y
01|249405|12|1|CAT40-SF20-120CP|Y
01|249405|12|2|CAT40 Shrink Fit Holder 20mm CoolantPorts 25K|Y
01|249405|13|1|CAT40-SF25-120CP|Y
01|249405|13|2|CAT40 Shrink Fit Holder 25mm CoolantPorts 25K|Y
01|249405|14|1|CAT40-SF5-120|Y
01|249405|14|2|CAT40 Shrink Fit Holder 25mm 25K|Y
01|249405|14|3|No CP version|Y
01|249405|15|1|CAT40-SF6-120CP|Y
01|249405|15|2|CAT40 Shrink Fit Holder 6mm CoolantPorts 25K|Y
01|249405|16|1|CAT40-SF8-120CP|Y
01|249405|16|2|CAT40 Shrink Fit Holder 8mm CoolantPorts 25K|Y
01|249405|18|1|NCAT40-SF12-120CP|Y
01|249405|18|2|NCAT40 DualContact Shrink Fit Holder 12mm CoolantPorts|Y
01|249405|19|1|NCAT40-SF14-120CP|Y
01|249405|19|2|NCAT40 DualContact Shrink Fit Holder 14mm CoolantPorts|Y
01|249405|20|1|NCAT40-SF16-120CP|Y
01|249405|20|2|NCAT40 DualContact Shrink Fit Holder 16mm CoolantPorts|Y
01|249405|21|1|NCAT40-SF18-120CP|Y
01|249405|21|2|NCAT40 DualContact Shrink Fit Holder 18mm CoolantPorts|Y
01|249405|22|1|NCAT40-SF20-120CP|Y
01|249405|22|2|NCAT40 DualContact Shrink Fit Holder 20mm CoolantPorts|Y
01|249405|23|1|NCAT40-SF25-120CP|Y
01|249405|23|2|NCAT40 DualContact Shrink Fit Holder 25mm CoolantPorts|Y
01|249405|24|1|NCAT40-SF5-120CP|Y
01|249405|24|2|NCAT40 DualContact Shrink Fit Holder 5mm CoolantPorts|Y
01|249405|25|1|NCAT40-SF6-120CP|Y
01|249405|25|2|NCAT40 DualContact Shrink Fit Holder 6mm CoolantPorts|Y
01|249405|26|1|NCAT40-SF6-120CP|Y
01|249405|26|2|NCAT40 DualContact Shrink Fit Holder 6mm CoolantPorts|Y
01|249405|33|1|NC4006-10-2.50|Y
01|249405|33|2|NCAT40 DualContact End Mill Holder 10mm ChipHole|Y
01|249405|34|1|NC4006-12-2.50|Y
01|249405|34|2|NCAT40 DualContact End Mill Holder 12mm ChipHole|Y
01|249405|35|1|NC4006-14-3.00|Y
01|249405|35|2|NCAT40 DualContact End Mill Holder 14mm ChipHole|Y
01|249405|36|1|NC4006-16-3.00|Y
01|249405|36|2|NCAT40 DualContact End Mill Holder 16mm ChipHole|Y
01|249405|37|1|NC4006-25-4.00|Y
01|249405|37|2|NCAT40 DualContact End Mill Holder 25mm ChipHole|Y
01|249405|38|1|NC4006-32-4.00|Y
01|249405|38|2|NCAT40 DualContact End Mill Holder 32mm ChipHole|Y
01|249417|2|1|POSITIONING BLOCK FOR HAAS|Y
01|249423|1|1|**NET Price**|Y
01|249423|2|1|**NET Price**|Y
01|249423|3|1|**NET Price**|Y
01|249423|4|1|**NET Price**|Y
01|249423|5|1|**NET Price**|Y
01|249424|6|1|A tariff surcharge may be added to this quotation in|Y
01|249424|6|2|the event of a sustained tariff increase on the|Y
01|249424|6|3|importation of this product.  Any surcharge will be|Y
01|249424|6|4|disclosed prior to acceptance of an order.|Y
01|249427|1|1|Large swing table with two Nikken AR21 controls|Y
01|249427|1|2|4.4KW AR21 controllers for both axes.|Y
01|249427|1|3|Scales on both axis RU77-4096A|Y
01|249427|3|1|Table with large swing|Y
01|249432|1|1|HSK63C-HC12-75|Y
01|249432|1|2|HSK63C Hydraulic Chuck 12mm|Y
01|249432|2|1|HSK63A-HC25-120|Y
01|249432|2|2|HSK63A Hydraulic Chuck 25mm|Y
01|249432|3|1|HSK63C-HC16-80|Y
01|249432|3|2|HSK63C Hydraulic Chuck 16mm|Y
01|249432|4|1|HSK50C-HC10-65|Y
01|249432|4|2|HSK50C Hydraulic Chuck 10mm|Y
01|249432|5|1|HSK50C-HC18-80|Y
01|249432|5|2|HSK50C Hydraulic Chuck 18mm|Y
01|249432|6|1|HSK50C-HC16-80|Y
01|249432|6|2|HSK50C Hydraulic Chuck 16mm|Y
01|249432|7|1|HSK63A-HC06-80|Y
01|249432|7|2|HSK63A Hydraulic Chuck 06 MM|Y
01|249444|1|1|Delivery: mid-June for PO placed bfore 5/27|Y
01|249445|1|1|1st Batch/S#1018602 K-Oklahoma/Tinker 2/17/26:DWG APRVD|N
01|249449|1|1|**cannot be cancelled or returned after PO is placed*|Y
01|249450|1|1|MOQ=10pcs|Y
01|249452|1|1|**cannot be cancelled or returned after PO is placed*|Y
01|249460|16|1|NT55-C3X-ICE  (C3 Output ICE 10000RPM Max)|Y
01|249460|16|2|Standard Allen wrench to be used to change tool.  Not|Y
01|249460|16|3|included with tooling.|Y
01|249460|18|1|NT55-C3Z-ICE-55(C3 Output ICE 10000RPM Max CH = 55mm)|Y
01|249460|18|2|Standard Allen wrench to be used to change tool.  Not|Y
01|249460|18|3|included with tooling.|Y
01|249460|20|1|NT55-C3Z-ICE-75(C3 Output ICE 10000RPM Max CH = 75mm)|Y
01|249460|20|2|Standard Allen wrench to be used to change tool.  Not|Y
01|249460|20|3|included with tooling.|Y
01|249467|1|1|FOR WIA KF7600L OR MAKINO PS105|Y
01|249467|1|2|FANUC Oi-MF+ SERIES CONTROL|Y
01|249467|1|3|NEED DATA SHEETS AT TIME OF ORDER.|Y
01|249467|1|4|EACH REQUIRES INSTALLATION (LINE#5)|Y
01|249467|2|1|8 VERSION|Y
01|249467|4|1|10 VERSION (RECOMMENDED)|Y
01|249470|5|1|special- included in price of purchase or RT|Y
01|249475|1|1|FOR DN SOLUTIONS DNM6700L FANUC Oi-MF+ CONTROL.|Y
01|249475|1|2|RIGHT SIDE MOUNT W/CUSTOMER PROVIDED FIXTURE|Y
01|249475|1|3|PROVIDE DATA SHEETS AT TIME OF ORDER.|Y
01|249476|1|1|FOR DN SOLUTIONS DNM7500|Y
01|249476|1|2|FANUC Oi-MF+ CONTROL. CUSTOMER SUPPLIED TRUNNION|Y
01|249476|1|3|PROVIDE DATA SHEETS AT TIME OF ORDER.|Y
01|249477|2|1|Please note additional 20% applied per overstock promo.|Y
01|249477|2|2|Once PO/order issued these cannot be cancelled or|Y
01|249477|2|3|returned.|Y
01|249479|3|1|LN to make block after receipt of spindle specs|Y
01|249496|1|1|H63FRAM-ER16-206ST - looking to have repeat tool|Y
01|249496|1|2|H80FRAM-ER16-206ST done with HSK63F.|Y
01|249508|1|1|No Inspection Required. Ok for WH1|Y
01|249518|2|1|Installation includes: Dual axis drivefiber optic|Y
01|249518|2|2|communications cablesbulkhead cables external cables|Y
01|249518|2|3|service time and travel.|Y
01|249519|1|1|THIS PACKAGE REPRESENTS FOUNDATION BASE TO SUPPORT|Y
01|249519|1|2|QUICK CHANGE OF CUSTOMER TOOLING LIKE PALLETS OR|Y
01|249519|1|3|PROPOSED PYRAMID IN OUR CASE. +-.0001 REPEATABILITY|Y
01|249532|1|1|Quoted at Net price.|Y
01|249540|2|1|Non-cancellable/non-returnable|Y
01|249547|1|1|SN:4088 EU:RCR Manufacturing|Y
01|249547|1|2|RGA#TAR-62952 CNC250FA|Y
01|249547|1|3|Repair Declined Return Disassembled|Y
01|249553|2|1|List Price = $24625.00 usd. Discounted 15%|Y
01|249559|2|1|Please note additional 20% applied per Overstock Promo.|Y
01|249559|2|2|These are non-standard stock and considered special.|Y
01|249559|2|3|Once PO/order issued these can't be cancelled or|Y
01|249559|2|4|returned.|Y
01|249574|1|1|NT55 X Live Tool C4 output ICE Max 6500RPM|Y
01|249574|6|1|NT55 Z Live Tool C4 output ICE Max 6500RPM|Y
01|249580|1|1|NC5001-22-60CP NCAT50 Dual Contact Shell Mill|Y
01|249580|1|2|holder 22mm.|Y
01|249581|1|1|CUSTOMER NUT SWAP|Y
01|249587|2|1|Please Note: Net price includes the cost of the|Y
01|249587|2|2|BIS-M-122-02/A and etching of Pratts # PT457340REV-|Y
01|249587|2|3|on holder and packaging.|Y
01|249588|1|1|Discontinued - non-cancellable non-returnable|Y
01|249588|1|2|Additional 20% Overstock Promo Discount applied|Y
01|249591|1|1|CHECK WH2 WITH BRIAN NORRIS/ OEN MOWELL|Y
01|249596|1|1|**NET PRICE** Special - cannot be cancelled or|Y
01|249596|1|2|returned upon receipt of a PO|Y
01|249598|1|1|SN:6393 EU:Custom Tool & Machine|Y
01|249598|1|2|RGA#TAR-62919 5AX-201FA-M-AB|Y
01|249604|1|1|NC5-46-HC32|Y
01|249604|1|2|NC5 hydraulic holder with a 32.0mm ID w/ PS-123E|Y
01|249604|1|3|Minimum order quantity is 3pcs|Y
01|249615|1|1|Cables are included|Y
01|249619|1|1|Cables are included.|Y
01|249623|1|1|Currently have four (4) in stock in Illinois.  After|Y
01|249623|1|2|the inventory is depleted the HSK100A-SK6C-105-IDU|Y
01|249623|1|3|will be used from there on out.|Y
01|249629|1|1|RGA#CUR-62889/|Y
01|249629|1|2|Repair of MRAM-ER25L SN:1990443204 (Mim#162710)|Y
01|249629|2|1|Bearings seals and o-rings to be replaced|Y
01|249633|12|1|HSK63A Shrink Fit Holder 6mm GL 200MM|Y
01|249633|12|2|H63A-SF6-200CP|Y
01|249633|12|3|Non-Cancellable Non-Returnable|Y
01|249633|12|4|Required Drawer Approval|Y
01|249633|13|1|HSK63A Shrink Fit Holder 8mm GL 200 mm|Y
01|249633|13|2|HSK63A-SF8-200CP|Y
01|249633|13|3|Non-Cancellable Non-Returnable|Y
01|249633|13|4|Required Drawer Approval|Y
01|249633|14|1|HSK63A Shrink Fit Holder 10 mm GL 200 mm|Y
01|249633|14|2|HSK63A-SF10-200CP|Y
01|249633|14|3|Non-Cancellable Non-Returnable|Y
01|249633|14|4|Required Drawer Approval|Y
01|249633|15|1|HSK63A Shrink Fit Holder 12 mm GL 200mm|Y
01|249633|15|2|HSK63A-SF12-200CP|Y
01|249633|15|3|Non-Cancellable Non-Returnable|Y
01|249633|15|4|Required Drawer Approval|Y
01|249633|20|1|HSK100A Shrink Fit Holder 6mm GL 200 mm|Y
01|249633|20|2|HSK100A-SF6-200CP|Y
01|249633|20|3|Non-Cancellable Non-Returnable|Y
01|249633|20|4|Required Drawer Approval|Y
01|249633|21|1|HSK100A Shrink Fit Holder 8mm GL 200 mm|Y
01|249633|21|2|HSK100A-SF8-200CP|Y
01|249633|21|3|Non-Cancellable Non-Returnable|Y
01|249633|21|4|Required Drawer Approval|Y
01|249633|22|1|HSK100A Shrink Fit Holder 10mm GL 200 mm|Y
01|249633|22|2|HSK100A-SF10-200CP|Y
01|249633|22|3|Non-Cancellable Non-Returnable|Y
01|249633|22|4|Required Drawer Approval|Y
01|249633|23|1|HSK100A Shrink Fit Holder 12mm GL 200 mm|Y
01|249633|23|2|HSK100A-12-200CP|Y
01|249633|23|3|Non-Cancellable Non-Returnable|Y
01|249633|23|4|Required Drawer Approval|Y
01|249633|24|1|IT40 Shrink Fit Holder 6 mm 120 mm|Y
01|249633|24|2|IT40-SF6-120CP|Y
01|249633|24|3|Non-Cancellable Non-Returnable|Y
01|249633|24|4|Required Drawer Approval|Y
01|249633|25|1|IT40 Shrink Fit Holder 8 mm 120 mm|Y
01|249633|25|2|IT40-SF8-120CP|Y
01|249633|25|3|Non-Cancellable Non-Returnable|Y
01|249633|25|4|Required Drawer Approval|Y
01|249633|26|1|IT40 Shrink Fit Holder 10mm 120 mm|Y
01|249633|26|2|IT40-SK10-120CP|Y
01|249633|26|3|Non-Cancellable Non-Returnable|Y
01|249633|26|4|Required Drawer Approval|Y
01|249633|27|1|IT40 Shrink Fit Holder 12mm 120 mm|Y
01|249633|27|2|IT40-SF12-120CP|Y
01|249633|27|3|Non-Cancellable Non-Returnable|Y
01|249633|27|4|Required Drawer Approval|Y
01|249633|28|1|IT40 Shrink Fit Holder 16mm 120 mm|Y
01|249633|28|2|IT40-SF16-120|Y
01|249633|28|3|Non-Cancellable Non-Returnable|Y
01|249633|28|4|Required Drawer Approval|Y
01|249638|1|1|SN6217 PO#63428/S#1035783 Returning from Titan-painting|Y
01|249639|1|1|Part #CAT50-AF1-30-OH|Y
01|249639|1|2|Back spot facing arbor - Main Body|Y
01|249639|1|3|Quoted at NET price.|Y
01|249639|2|1|Part # BF130-19-38.1-25.4C|Y
01|249639|2|2|Arbor for above main body.|Y
01|249639|2|3|Quoted at NET price.|Y
01|249639|3|1|Part # 9BF130-19-38.1-25.4C-I|Y
01|249639|3|2|Byte for above tool.|Y
01|249639|3|3|Quoted at NET price.|Y
01|249639|4|1|Sold in 1 pack of 10-pcs only.|Y
01|249639|4|2|Quoted at NET price.|Y
01|249648|1|1|Discontinued - Cannot be cancelled or returned|Y
01|249648|1|2|Additioanl 20% Overstock Promo discount applied|Y
01|249650|1|1|RGA#TOR-62960/|Y
01|249650|1|2|Repair of customers 2x CAT50-C1.1/4-105U-IDU|Y
01|249656|1|1|Final Part# C5001-0750-6.00CP-DIN-M  **NET Price**|Y
01|249656|1|2|CAT50 Shell Mill Holder 3/4 CoolantPorts ChipHole 20K|Y
01|249656|1|3|with 2-Hole DIN|Y
01|249656|1|4|**non-cancellable non-returnable**|Y
01|249659|4|1|PRICING AND DELIVERY TBD|Y
01|249661|3|1|Estimated lead time is 4-5 weeks after receipt|Y
01|249661|3|2|of order|Y
01|249661|20|1|Estimated leadtime is 6-8 weeks after receipt of|Y
01|249661|20|2|order|Y
01|249661|24|1|Estimated leadtime is 8-10 weeks after receipt of|Y
01|249661|24|2|order|Y
01|249669|1|1|NC5-46 holders are assembled with the pull stud at the|Y
01|249669|1|2|factory.  P/N: PS-123E has been provided by the|Y
01|249669|1|3|customer over a live chat.|Y
01|249671|1|1|NCAT40-SK16C-180UP-IDU|Y
01|249671|1|2|NCAT40 DualContact Slim Chuck SK16 Coolant HiSpeed|Y
01|249671|1|3|ChipHole 25K|Y
01|249674|1|1|Estimated delivery is 8~10 weeks after receipt of an|Y
01|249674|1|2|order.  If this quote becomes an order Engineering|Y
01|249674|1|3|needs the Questionnaire and Customer Agreement Form|Y
01|249674|1|4|completed in their entirety.|Y
01|249674|2|1|Estimated lead time is 3~5 days after design approval.|Y
01|249675|1|1|SN:4023 EU:Madison Precision Products|Y
01|249675|1|2|RGA#TAR-62902 5AX-201FA-M|Y
01|249677|17|1|Currently no stock in Illinois.  Estimated lead time|Y
01|249677|17|2|13~15 weeks after receipt of an order.|Y
01|249677|17|3|PLEASE NOTE:  THIS ITEM IS SPECIAL NON-STANDARD STOCK.|Y
01|249677|17|4|ONCE A PURCHASE ORDER IS RECEIVED THIS ITEM CANNOT BE|Y
01|249677|17|5|CANCELLED OR RETURNED.|Y
01|249678|1|1|Includes:Mitsubishi motors HK-ST352WJ and 12P+1P rotary|Y
01|249678|1|2|joint|Y
01|249678|2|1|Price includes Mitsubishi HK-ST352WJ and 8+1RJ rotary|Y
01|249678|2|2|joint|Y
01|249680|1|1|CAT40-HC06-68|Y
01|249680|1|2|CAT40 Hydraulic Chuck 6mm GL 68mm|Y
01|249680|1|3|Minimum Order Quantity 3 pcs.|Y
01|249680|2|1|CAT40-HC08-68|Y
01|249680|2|2|CAT40 Hydraulic Chuck 8mm GL 68mm|Y
01|249680|2|3|Minimum Order Quantity 3 pcs.|Y
01|249680|3|1|CAT40-10-72|Y
01|249680|3|2|CAT40 Hydraulic Chuck 10mm GL 72mm|Y
01|249680|3|3|Minimum Order Quantity 3 pcs.|Y
01|249680|4|1|CAT40-12-77|Y
01|249680|4|2|CAT40 Hydraulic Chuck 12mm GL 77 mm|Y
01|249680|4|3|Minimum Order Quantity 3 pcs.|Y
01|249693|1|1|Currently 7 in stock in Illinois. Estimated lead time|Y
01|249693|1|2|for the balance is 6-8 weeks after receipt of order|Y
01|249701|4|1|includes adapter plate|Y
01|249704|1|1|Please Note: This is for billing purposes only please|Y
01|249704|1|2|send PO directly to Brian D.|Y
01|249710|1|1|Flexible Angle Head|Y
01|249710|1|2|Quick Change MI50|Y
01|249710|2|1|Flexible Angle Head|Y
01|249710|2|2|Quick Change MI50|Y
01|249710|3|1|Fixed Angle Head 45|Y
01|249710|3|2|Quick Change MI50|Y
01|249710|4|1|Fixed Angle Head 45|Y
01|249710|4|2|Quick Change MI50|Y
01|249714|2|1|Estimated delivery end of June|Y
01|249726|12|1|I will check for factory stock and update when avail.|Y
01|249735|1|1|Special non-standard stock - cannot be cancelled or|Y
01|249735|1|2|returned upon receipt of a PO|Y
01|249735|2|1|Special non-standard stock - cannot be cancelled or|Y
01|249735|2|2|returned upon receipt of a PO|Y
01|249736|4|1|3-JAW SELF-CENT. SCROLL CHUCK 3564-6 with adapter|Y
01|249736|5|1|3-JAW SELF-CENT. SCROLL CHUCK 3565-8 with adapter|Y
01|249744|1|1|Additional 20% Overstock Promo discount applied.|Y
01|249744|1|2|Cannot be cancelled or returned|Y
01|249744|3|1|Special non-standard stock: cannot be cancelled or|Y
01|249744|3|2|returned|Y
01|249751|1|1|This is for yearly calibration.|Y
01|249764|1|1|CAT40-C1/2 holder with 71mm GL|Y
01|249764|1|2|CAT40-C1/2-71U-IDU|Y
01|249764|3|1|CAT40-C1/2 holder with 85mm GL.|Y
01|249764|3|2|CAT40-C1/2-85U-IDU|Y
01|249769|2|1|Quoted at Net Pricing.|Y
01|249769|2|2|Engineering needs the Lathe Spindle Information Form|Y
01|249769|2|3|completed in its entirety before we can accept a|Y
01|249769|2|4|Purchase Order.  Because this item will be modified|Y
01|249769|2|5|it cannot be cancelled or returned once a Purchase|Y
01|249769|2|6|Order is placed.|Y
01|249793|2|1|Delivery: mid-June for PO placed before 5/26|Y
01|249793|4|1|Delivery: mid-June for PO placed before 5/26|Y
01|249801|1|1|Estimated lead time is one week after receipt of an|Y
01|249801|1|2|order.|Y
01|249803|1|1|Currently no stock in Illinois however we do have stock|Y
01|249803|1|2|at the factory.  Estimated lead time is 4~6 weeks after|Y
01|249803|1|3|receipt of an order.|Y
01|249844|1|1|P/N: BT30-SF3-100CP|Y
01|249844|2|1|P/N: BT30-SF4-100CP|Y
01|249866|5|1|Final Sale-Non-cancellableNon-returnable|Y
01|249866|5|2|quoted at NET Pricing|Y
01|249866|6|1|Final Sale-Non-cancellableNon-returnable|Y
01|249866|6|2|Quoted at NET pricing|Y
01|249870|5|1|Final Sale-Non-cancellableNon-returnable|Y
01|249870|5|2|quoted at NET Pricing|Y
01|249870|6|1|Final Sale-Non-cancellableNon-returnable|Y
01|249870|6|2|Quoted at NET pricing|Y
01|249871|21|1|BT40-JTA6-45 - please note this is considered special|Y
01|249871|21|2|and has been quoted at special net price. Once PO/order|Y
01|249871|21|3|issued these cannot be cancelled or returned.|Y
01|249876|4|1|16 Scroll Chuck and adapter|Y
01|249878|5|1|A tariff surcharge of 8% will be added to every order|Y
01|249878|5|2|placed after September 1st 2025(until further notice).|Y
01|249878|5|3|This surcharge will be acknowledged upon acceptance|Y
01|249878|5|4|of every order.|Y
01|249879|1|1|WE NEED TO KNOW IF THE CUSTOMER NEEDS THE DRIVE PINS|Y
01|249880|1|1|Please let us know if the customer needs the drive|Y
01|249880|1|2|pins for this holder for their Makino.|Y
01|249901|1|1|1st Batch/S#1037308|Y
01|249901|2|1|Req.INS/OD Groove frange Dua issue/Repeat S#1034477|Y
01|249901|3|1|Req.INS/OD Groove frange Dua issue/Repeat S#1034477|Y
01|249901|4|1|Req.INS/OD Groove frange Dia issue|Y
01|249901|5|1|Req.INS/Check Rego nut is equipped/REPEAT S#1033701|Y
01|249901|6|1|Req.INS/Install E32-NUTER32-SCREW(C) REPEAT S#1033701|Y
01|249901|7|1|Req.INS/Install E40-NUTER40-SCREW(C) REPEAT S#1033701|Y
01|249901|8|1|Req.INS/OD GRV Frange Dia/Install E16-NUT/ER16-SCREW(C)|Y
01|249901|9|1|Req.INS/Install E32-NUT&ER32-SCREW(C) Repeat/S#1034477|Y
01|249901|10|1|1st Batch/(1)S#1035337 MfgSol/J&J|Y
01|249901|11|1|Req.INS/S#1032832 Ref.NCR262-1 Remake|Y
01|249902|3|1|PS-G63|Y
01|249902|4|1|PS-G410|Y
01|249907|1|1|Leadtime is 6-8 weeks ARO|Y
01|249920|1|1|HSK63A-SM40-150CP - HSK63A Shell Mill Holder 40mm|Y
01|249920|1|2|150mm GL 200mm total length w/ coolant ports.|Y
01|249920|1|3|Please note these are considered special and have been|Y
01|249920|1|4|quoted at special net price. Once PO/order issued|Y
01|249920|1|5|these cannot be cancelled or returned.|Y
01|249925|1|1|HSK80F Shrink Fit Holder 30mm shortest possible GL.|Y
01|249931|1|1|FOR NOMURA DST-500L W/ MITSUBISHI M830 or M850|Y
01|249931|1|2|5-AXIS CONTROL.|Y
01|249931|1|3|L-N TO SUPPLY DRIVES INTERFACE CABLES TABLE CABLES|Y
01|249931|1|4|TOOL BALANCE. LEFT SIDE MOUNT TILT AXIS PARALLEL TO Y|Y
01|249931|1|5|GOSIGER TO PROVIDE INSTALL LABOR.|Y
01|249931|1|6|E-PLAN AND CONTROL DATA SHEETS REQ'D AT TIME OF ORDER|Y
01|249931|3|1|Electrical Installation kit for Mits M830/850|Y
01|249931|3|2|Includes: AMP/Cables/Fiber Optic/Hardware/PRM|Y
01|249931|3|3|Labor provided by Gosiger HV.|Y
01|249937|3|1|9HC22 is wrench for each milling chuck & KM3/4|Y
01|249937|3|2|is collet type.|Y
01|249950|1|1|NC5006-25-4.00CP|Y
01|249950|1|2|NCAT50 DualContact End Mill Holder 25mm ChipHole 25K|Y
01|249950|1|3|CoolantPorts|Y
01|249950|2|1|NC5006-32-4.00CP|Y
01|249950|2|2|NCAT50 DualContact End Mill Holder 32mm ChipHole 25K|Y
01|249950|2|3|CoolantPorts|Y
01|249954|3|1|Collet closer with adapter.|Y
01|249954|4|1|Base plate for table and tailstock|Y
01|249956|1|1|Currenlty three (3) in stock in Illinois.  Estimated|Y
01|249956|1|2|lead time for the balance is 12~14 weeks after receipt|Y
01|249956|1|3|of an order.|Y
01|249956|2|1|Currently no stock in Illinois.  Estimated lead time is|Y
01|249956|2|2|12~14 weeks after receipt of an order.|Y
01|249956|3|1|Currently three (3) in stock in Illinois.  Estimated|Y
01|249956|3|2|lead time for the balance is 12~14 weeks after receipt|Y
01|249956|3|3|of an order.|Y
01|249956|4|1|NCAT40 DualContact to C5 Reducer (Screw connection|Y
01|249956|4|2|GL = 30mm)|Y
01|249956|5|1|NCAT40 DualContact to C5 Reducer (Screw connection|Y
01|249956|5|2|GL = 70mm)|Y
01|249956|6|1|CAT40 to C5 Reducer (Screw connection GL = 30mm)|Y
01|249956|7|1|CAT40 to C5 Reducer (Screw connection GL = 70mm)|Y
01|249958|1|1|Additional 20% Overstoc Promo discount applied.|Y
01|249958|1|2|Cannot be cancelled or returned.|Y
01|249960|1|1|SN:7250 EU:The Robert E. Morris Company|Y
01|249960|1|2|RGA#TAR-62910 5AX-130OSP4-M|Y
01|249967|2|1|Duplicate of SN15614|Y
01|249967|4|1|Duplicate of SN4077|Y
01|249967|6|1|Duplicate of SN7165|Y
01|249979|7|1|Delivery: mid-June for PO placed before 5/26|Y
01|249990|1|1|SPECIAL DEMO UNIT PRICING|Y
01|249990|1|2|**non-cancellablenon-returnable**|Y
01|249990|2|1|SPECIAL DEMO UNIT PRICING|Y
01|249990|2|2|**non-cancellablenon-returnable**|Y
01|249990|3|1|SPECIAL DEMO UNIT PRICING|Y
01|249990|3|2|**non-cancellablenon-returnable**|Y
01|249990|4|1|SPECIAL DEMO UNIT PRICING|Y
01|249990|4|2|**non-cancellablenon-returnable**|Y
01|249990|5|1|SPECIAL DEMO UNIT PRICING|Y
01|249990|5|2|**non-cancellablenon-returnable**|Y
01|249992|5|1|On-Site Installation and Training for E346+ Presetter|Y
01|249995|6|1|C4006-0750-4.00CP2|Y
01|249995|6|2|Item number to be created once modification is|Y
01|249995|6|3|completed.  THIS ITEM IS MODIFIED.  ONCE A PURCHASE|Y
01|249995|6|4|ORDER IS RECEIVED THIS ITEM CANNOT BE CANCELLED OR|Y
01|249995|6|5|RETURNED.|Y
01|249995|7|1|QUOTED AT NET PRICING PER HOLDER.|Y
01|250007|1|1|HSK63A-SF0187-3.15MT|Y
01|250007|2|1|HSK63A-SF0187-6.30MT|Y
01|250018|1|1|45% DISC applies if all 4 sets of 510-SET-18 are bought|Y
01|250018|1|2|any quanity less is standard disc of 30% applies|Y
01|250024|1|1|This is a special price for a show table with a|Y
01|250024|1|2|core buy back promo.|Y
01|250027|4|1|DELIVERY: mid-June for PO placed before 5/26|Y
01|250028|1|1|THIS PACKAGE REPRESENTS FOUNDATION BASE TO SUPPORT|Y
01|250028|1|2|QUICK CHANGE OF CUSTOMER TOOLING LIKE PALLETS OR|Y
01|250028|1|3|PROPOSED PYRAMID IN OUR CASE. +-.0001 REPEATABILITY|Y
01|250042|1|1|SPECIAL SHOW PRICING|Y
01|250042|1|2|**non-cancellable non-returnable after receipt of PO**|Y
01|250042|2|1|SPECIAL SHOW PRICING|Y
01|250042|3|1|SPECIAL SHOW PRICING|Y
01|250042|4|1|SPECIAL SHOW PRICING|Y
01|250042|5|1|SPECIAL SHOW PRICING|Y
01|250042|6|1|SPECIAL SHOW PRICING|Y
01|250042|7|1|SPECIAL SHOW PRICING|Y
01|250042|8|1|SPECIAL SHOW PRICING|Y
01|250042|8|2|**non-cancellable non-returnable after receipt of PO**|Y
01|250049|1|1|SPECIAL SHOW PRICING|Y
01|250049|1|2|**non-cancellable non-returnable after receipt of PO**|Y
01|250049|2|1|SPECIAL SHOW PRICING|Y
01|250049|3|1|SPECIAL SHOW PRICING|Y
01|250049|4|1|SPECIAL SHOW PRICING|Y
01|250049|5|1|SPECIAL SHOW PRICING|Y
01|250049|6|1|SPECIAL SHOW PRICING|Y
01|250049|7|1|SPECIAL SHOW PRICING|Y
01|250049|8|1|SPECIAL SHOW PRICING|Y
01|250049|8|2|**non-cancellable non-returnable after receipt of PO**|Y
01|250051|1|1|For NIKKEN UK's CNC501ZA proj.|N
01|250051|3|1|For NIKKEN UK's CNC501ZA proj.|N
01|250053|1|1|*non-cancellable non-returnable after receipt of PO**|Y
01|250053|8|2|**non-cancellable non-returnable after receipt of PO**|Y
01|250055|1|1|Calibration for Hathor Six A S/N 6661|Y
01|250055|1|2|Includes Travel Expenses.|Y
01|250075|1|1|Currency:USD|Y
01|250075|2|1|A tariff surcharge may be added to this quotation in|Y
01|250075|2|2|the event of a sustained tariff increase on the|Y
01|250075|2|3|importation of this product.  Any surcharge will be|Y
01|250075|2|4|disclosed prior to acceptance of an order.|Y
01|250076|4|1|HSK63F-SK16-90P|Y
01|250076|4|2|HSK63F Slim Chuck SK16 NoDrivePin Coolant HiSpeed 30K|Y
01|250078|1|1|H63FRAM-ER16-206ST - HSK63F Angle Head ER16 Slim|Y
01|250078|1|2|Please allow 3 weeks on manufacturing drawing 10 weeks|Y
01|250078|1|3|after signed approval drawing & 2-3 weeks on shipment.|Y
01|250084|2|1|Please note additional 20% applied per overstock promo.|Y
01|250084|2|2|Once PO/order issued these cannot be cancelled or|Y
01|250084|2|3|returned.|Y
01|250085|1|1|Estimated lead time is 14~16 weeks after receipt of an|Y
01|250085|1|2|order.|Y
01|250091|1|1|5% ADDITIONAL DISCOUNT|N
01|250097|1|1|Estimated lead time end of June|Y
01|250099|1|1|FOR BUDGETARY QUOTE 250087|Y
01|250105|3|1|Estimated delivery 14-16wks ARO|Y
01|250113|1|1|SN:13147 EU:Caterpillar Inc.|Y
01|250113|1|2|RGA#TAR-62972 CNC401FA-M|Y
01|250113|2|1|Repair declined return requested.|Y
01|250113|3|1|1x Storage Charge Starting May 14th|Y
01|250122|9|1|Quoted at NET Price.|Y
01|250123|1|1|**non-cancellable non-returnable**|Y
01|250123|1|2|Additional 20% Overstock Promo discount applied|Y
01|250126|9|1|Quoted at NET Price.|Y
01|250129|1|1|Testing Mitsubishi motor hc-h53t-a42|Y
01|250131|6|1|Quoted at NET Price.|Y
01|250133|1|1|BT40-CZF32-120|Y
01|250133|2|1|NBT40-CZF32-120 Dual Contact|Y
01|250142|6|1|HAAS THIRD PARTY ROTARY TABLE SOFTWARE PROVISION|Y
01|250142|6|2|MUST BE ADDED PRIOR TO L-N SERVICE TECH ARRIVING|Y
01|250145|1|1|NBT30-BHS20-96-X2-L|Y
01|250145|2|1|NBT30-BHSH20-79-X2-R|Y
01|250145|3|1|NBT30-BHC20-38|Y
01|250149|1|1|NCAT40-SK16C-180UP-IDU|Y
01|250149|1|2|NCAT40 DualContact Slim Chuck SK16 Coolant HiSpeed|Y
01|250149|1|3|ChipHole 25K|Y
01|250153|2|1|BT50-SF32-160|Y
01|250153|3|1|BT50-FMH32-96-150|Y
01|250153|7|1|BT50-SF14-160|Y
01|250153|8|1|BT50-SF14-130|Y
01|250153|9|1|BT50-SF6-130|Y
01|250153|10|1|BT50-SF18-130|Y
01|250153|11|1|BT50-SF20-120|Y
01|250153|12|1|B5006-25-105|Y
01|250153|12|2|End mill holder 25mm GL 105mm|Y
01|250153|15|1|BT50-SF16-120|Y
01|250153|17|1|BT50-SF16-130|Y
01|250153|18|1|BT50-SF8-130|Y
01|250153|19|1|B5006-32-105|Y
01|250153|19|2|End mill 32 mm Gl 105 mm|Y
01|250155|9|1|2x ZERO POINT BASE PLATE FOR CNC260FA-M|Y
01|250155|12|1|QUICK CHANGE SK20 FIXTURE BLOCK-HOLDS 5ea K32-SK20-120|Y
01|250155|12|2|USE TO USE RT-ACCS-WKHD FOR THESE ITEMS|Y
01|250155|15|1|Adding weldon flats|Y
01|250156|1|1|FOR YCM JC14 VMC W/ FANUC Oi-MF+|Y
01|250156|1|2|FANUC DATA SHEETS AND ELECTRICAL SCHEMATIC RQR'D|Y
01|250156|1|3|AT TIME OF ORDER.|Y
01|250156|1|4|SPECIFY LEFT OR RIGHT SIDE MOUNT.|Y
01|250159|1|1|GENOS M560V|Y
01|250163|15|1|Lyndex-Nikken to make positioning block upon receipt|Y
01|250163|15|2|of spindle drawing confirmation. Quoted at NET price.y|Y
01|250166|1|1|LIST = $512.00 EA.|Y
01|250166|1|2|RESALE DISC = 20%|Y
01|250166|2|1|LIST = $72.00  EA.|Y
01|250166|2|2|RESALE DISC = 20%|Y
01|250171|1|1|WH-ZV-M96A|Y
01|250177|1|1|CAT40 Shrink Fit Holder 5mm GL=80|Y
01|250177|1|2|CAT40-SF5-80CP|Y
01|250177|4|1|CAT40 Shrink Fit Holder 14mm GL=130|Y
01|250177|4|2|CAT40-SF14-130CP|Y
01|250177|6|1|CAT40 Shrink Fit Holder 18mm GL=130|Y
01|250177|6|2|CAT40-SF18-130CP|Y
01|250187|1|1|Estimated lead time is end of July after receipt of an|Y
01|250187|1|2|order.|Y
01|250196|1|1|SPECIAL SHOW PRICING|Y
01|250196|1|2|**non-cancellable non-returnable after receipt of PO**|Y
01|250196|2|1|SPECIAL SHOW PRICING|Y
01|250196|3|1|SPECIAL SHOW PRICING|Y
01|250196|4|1|SPECIAL SHOW PRICING|Y
01|250196|5|1|SPECIAL SHOW PRICING|Y
01|250196|6|1|SPECIAL SHOW PRICING|Y
01|250196|7|1|SPECIAL SHOW PRICING|Y
01|250196|8|1|SPECIAL SHOW PRICING|Y
01|250196|9|1|SPECIAL SHOW PRICING|Y
01|250197|1|1|SPECIAL SHOW PRICING|Y
01|250197|1|2|**non-cancellable non-returnable after receipt of PO**|Y
01|250197|2|1|SPECIAL SHOW PRICING|Y
01|250197|3|1|SPECIAL SHOW PRICING|Y
01|250197|4|1|SPECIAL SHOW PRICING|Y
01|250197|5|1|SPECIAL SHOW PRICING|Y
01|250197|6|1|SPECIAL SHOW PRICING|Y
01|250197|7|1|SPECIAL SHOW PRICING|Y
01|250197|8|1|SPECIAL SHOW PRICING|Y
01|250197|9|1|SPECIAL SHOW PRICING|Y
01|250237|1|1|For OSG INDIA|Y
01|250237|1|2|Cannot be cancelled or returned upon receipt of a PO.|Y
01|250237|1|3|Drawing approval is required.|Y
01|250237|3|1|For OSG INDIA|Y
01|250237|3|2|Cannot be cancelled or returned upon receipt of a PO.|Y
01|250237|3|3|Drawing approval is required.|Y
01|250237|4|1|Range:1.5~2mm|Y
01|250237|5|1|Range:2.5~3mm|Y
01|250237|6|1|Range:3~3.5mm|Y
01|250237|7|1|Range:3.5~4mm|Y
01|250241|3|1|NC4001-16-35CP - NCAT40 DualContact Shell Mill Holder|Y
01|250241|3|2|16mm Coolant Ports 20K.|Y
01|250251|1|1|Estimated lead time is 4~6 weeks after receipt of an|Y
01|250251|1|2|order.|Y
01|250266|1|1|P/N: C6-SF0312-4.72CP|Y
01|250266|2|1|P/N: C6-SF0312-4.72CP|Y
01|250280|2|1|10mm Riser to make CH 180|Y
01|250280|2|2|Price & D TBD|Y
01|250287|1|1|HSK63A-FMC22-60#.|Y
01|250287|3|1|HSK63A-FMC22-90#|Y
01|250287|5|1|HSK63A-FMC27-60#.|Y
01|250287|7|1|HSK63A-FMC32-60#|Y
01|250287|9|1|HSK63A-FMH22-47-150.|Y
01|250287|11|1|HSK63A-FMH22-47-90#.|Y
01|250287|13|1|HSK63A-FMH27-60-90#.|Y
01|250287|15|1|HSK100A-FMH22-47-105#.|Y
01|250287|17|1|HSK100A-FMH27-60-60#|Y
01|250287|21|1|HSK100A-FMH27-76-90#|Y
01|250287|23|1|HSK100A-FMH32-96-90#|Y
01|250287|25|1|HSK100A-FMH32-96-150#|Y
01|250287|27|1|HSK100A-FMH40-100-75#.|Y
01|250291|1|1|Please note these are considered special and have been|Y
01|250291|1|2|quoted at special net price. Lyndex-Nikken will install|Y
01|250291|1|3|RFID chips that are provided by customer and will|Y
01|250291|1|4|rebalance holders.|Y
01|250306|1|1|Calibration Service Preventative Maintenance and|Y
01|250306|1|2|follow up training on E460N Presetter SN:6506|Y
01|250306|1|3|Service performed on ___|N
01|250306|2|1|On-Site Service Call ESTIMATE for Travel/Time/Labor|Y
01|250306|2|2|Travel:_ hours / Labor: _ hours|N
01|250307|1|1|P/N: BT30-SF3-100CP|Y
01|250307|2|1|P/N: BT30-SF4-100CP|Y
01|250311|1|1|1st Batch/Change Shim?(PPPD.1504?)|Y
01|250311|2|1|1st Batch/Change Shim?(PPPD.1504?)|Y
01|250311|3|1|Req.INS/Install S9/16-18X1/2|Y
01|250311|4|1|Req.INS/Make sure A3/8-24&3/4-KEYSET are equipped|Y
01|250311|5|1|Req.INS/Make sure A3/8-24&3/4-KEYSET are equipped|Y
01|250311|6|1|Req.INS/Make sure A1/2-20&1-KEYSET are equipped|Y
01|250311|7|1|Req.INS/Check Rego nut is equipped/REPEAT Stock/Orizon|Y
01|250311|8|1|Req.INS/Check Rego nut is equipped/REPEAT Stock/Orizon|Y
01|250311|9|1|Req.INS/Install E32-NUTER32-SCREW(C) REPEAT Stock/Oriz|Y
01|250311|10|1|Req.INS/Install E40-NUT & ER40-SCREW(C) Stock/Orizon|Y
01|250311|11|1|Req.INS/OD GRV Frange Dia/Install E16-NUT/ER16-SCREW(C)|Y
01|250311|12|1|Req.INS/OD GRV Frange Dia/Install E25-NUT&ER25-SCREW(C)|Y
01|250311|13|1|Req.INS/OD GRV Frange Dia/Install E32-NUT&ER32-SCREW(C)|Y
01|250311|14|1|Req.INS/OD GRV Frange Dia/Install E32-NUT&ER32-SCREW(C)|Y
01|250311|15|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|250313|1|1|Estimated lead time is 4~6 weeks after receipt of an|Y
01|250313|1|2|order.|Y
01|250313|4|1|Estimated lead time is 3~5 days after design approval.|Y
01|250313|4|2|Since this item will be modified it cannot be|Y
01|250313|4|3|cancelled or returned.|Y
01|250319|12|1|NUT SWAP AND BALANCE HSK63A-SK16-80-IDU|N
01|250319|13|1|NUT SWAP|N
01|250337|1|1|AACT Check up & Oil change Service 2nd/5(5yrs plan)|Y
01|250337|1|2|Please refer to MOU#: LN226426-01C|Y
01|250337|1|3|This service is scheduled for 9/5-9/7/2026 at AACT.|Y
01|250352|1|1|Customer supplying RFID chip|Y
01|250352|3|1|Customer will provide their own chips for LN to install|Y
01|250352|3|2|and rebalance.|Y
01|250352|3|3|NET PRICE|Y
01|250352|6|1|HSK100A-C1-135-IDI - These are non standard stock and|Y
01|250352|6|2|considered special. Once PO/Order issued these cannot|Y
01|250352|6|3|be cancelled or returned.|Y
01|250353|1|1|GW:10.5LBS(4.8kg)|Y
01|250353|1|2|Shipping box:11x8x4in(28x21x11cm)|Y
01|250353|3|1|GW:11.7LBS(5.3kg)|Y
01|250353|3|2|Shipping box:12x8x8in(31x21x21cm)|Y
01|250360|1|1|-BMT60 live X working with C3 output and ICE|Y
01|250360|1|2|-Shank with special interface D=60 / S1=76|Y
01|250360|1|3|-Drive twoflat AF 10mm|Y
01|250360|1|4|-Tooling interface Capto C3|Y
01|250360|1|5|-Internal coolant through the spindle and external|Y
01|250360|1|6|coolant over pipes / grade of filtration: max. 0.05mm /|Y
01|250360|1|7|continuous dryrun possible with sufficient cooling|Y
01|250360|1|8|phase / max. temperature of 90C (194F) must not be|Y
01|250360|1|9|exceeded - no reversal of rotation (drive direction|Y
01|250360|1|10|equals output direction)|Y
01|250360|3|1|-BMT60 live Z working with C3 output and ICE|Y
01|250360|3|2|-Shank for BMT style turret with D = 45mm|Y
01|250360|3|3|-Tooling interface Capto C3|Y
01|250360|3|4|-Internal coolant supply through spindle and external|Y
01|250360|3|5|-ICE version|Y
01|250360|3|6|-L1 = 85mm|Y
01|250360|3|7|-Gear ratio: i(n1/n2) = 1 : 1|Y
01|250360|3|8|-Max coolant pressure p(max) = 70 bar (1015 PSI)|Y
01|250360|3|9|-Max torque M (max) = 25 Nm|Y
01|250360|3|10|-Max revolution n1 & n2 (max) = 10000 rpm|Y
01|250371|1|1|Estimated lead time is 18~20 weeks after receipt of an|Y
01|250371|1|2|order.|Y
01|250373|1|1|NIT50-C32-135G|Y
01|250373|1|2|NSK50 DualContact Milling High Speed Chuck 32mm|Y
01|250373|1|3|Item requires signed drawing approval upon order.|Y
01|250373|1|4|delivery is 4months after signed drawing received.|Y
01|250373|2|1|Part# NIT50-SK16C-200|Y
01|250373|2|2|NSK50 DualContact Slim Chuck SK16 Coolant 200mm GL|Y
01|250373|2|3|Item requires signed drawing approval upon order.|Y
01|250373|2|4|delivery is 4months after signed drawing received.|Y
01|250387|2|1|SPINDLE DRAWING REQUIRED AT TIME OF ORDER.|Y
01|250402|1|1|ZERO POINT STANDARD FOUNDATION PLATE TO SUPPORT|Y
01|250402|1|2|CNC260POSP4-M STALLION 9X36 RT RISER TAIL STOCK|Y
01|250402|1|3|SUPPORT RISER.  ALL WITH ZERO POINT LOCATORS|Y
01|250402|1|4|MIDDLE PALLET 500mm X 500mm A36 B-G|Y
01|250402|1|5|E|N
01|250402|4|1|A36 RISERS FOR CNC260 AND STALLION SUPPORT.|Y
01|250402|4|2|CENTER PALLET (2) 500mm SQUARE BLANKS A36 B-G|Y
01|250402|4|3|1.25 THICK|Y
01|250404|1|1|TRAVEL EXPENSES LODGING ALL SERVICE PERSONNEL TIME|Y
01|250404|2|1|REPLACES ALL WIRING & CABLES BUT USES CURRENT|Y
01|250404|2|2|FANUC AMPLIFIER|Y
01|250418|1|1|P/N: NBT30-12-XXX|Y
01|250419|4|1|Estimated lead time is 8 weeks after receipt of an|Y
01|250419|4|2|order.|Y
01|250425|3|1|Please note additional 20% per overstock promo. Once PO|Y
01|250425|3|2|or order issued these cannot be cancelled or returned.|Y
01|250425|12|1|Please note additional 20% per overstock promo. Once PO|Y
01|250425|12|2|or order issued these cannot be cancelled or returned.|Y
01|250425|24|1|Please note additional 20% per overstock promo. Once PO|Y
01|250425|24|2|or order issued these cannot be cancelled or returned.|Y
01|250431|2|1|CONVERSION FROM INTERNAL COOLANT TO EXTERNAL COOLANT|Y
01|250431|2|2|ONLY TO ALLOW AIR TO BE RUN THROUGH THE TOOL|Y
01|250431|2|3|ONE TOOL WILL BE PINNED TO 11.1 DEGREES AND THE OTHER|Y
01|250431|2|4|TO 37 DEGREES. THESE ANGLES WILL BE APPLIED TO|Y
01|250431|2|5|DRAWING FOR SIGNOFF APPROVAL. FINAL CHECK WILL BE|Y
01|250431|2|6|PERFORMED AT THE FACTORY ON CMM|Y
01|250431|3|1|COST TO SHIP TOOLS FROM L-N USA TO FACTORY & BACK|Y
01|250454|7|1|This item is non-standard and considered special. Once|Y
01|250454|7|2|an order is placed it may not be cancelled or returned|Y
01|250454|7|3|PRICE IS QUOTED AT NET Price to Stellar as Special.|Y
01|250459|1|1|Custom Tool for specific applications -|Y
01|250459|1|2|**non-cancellable non-returnable after receipt of PO**|Y
01|250459|2|1|**NET PRICE** LN to make block after receipt of|Y
01|250459|2|2|spindle specs necessary for design|Y
01|250459|2|3|**non-cancellable non-returnable after receipt of PO**|Y
01|250460|1|1|**Non-cancellable non-returnable after receipt of PO**|Y
01|250460|8|1|**non-cancellable non-returnable after receipt of PO**|Y
01|250473|1|1|P/N: TBD|Y
01|250473|1|2|BMT45 Static OD Turn Quad C4 Output|Y
01|250481|1|1|Estimated lead time 2 weeks from date of order|Y
01|250483|1|1|P/N: QCFC42-080-SMO-SP    SAMPLE|Y
01|250483|1|2|with carbide surface treatment for improved gripping.|Y
01|250500|1|1|**non-cancellable non-returnable item after receipt|Y
01|250500|1|2|of a PO**|Y
01|250505|4|1|SPVC (4)stock @ factory Required DWG approval|Y
01|250505|5|1|H63A-SF32-160|Y
01|250513|1|1|Final Part# C6QC-ER32-042|Y
01|250513|1|2|Currently have seven (7) in stock at the factory.|Y
01|250513|1|3|Cutoff to order for mid/end June delivery is 5/27.|Y
01|250514|1|1|P/N: QCFC42-080-SMO-SP    SAMPLE|Y
01|250514|1|2|with carbide surface treatment for improved gripping.|Y
01|250530|1|1|Delivery: Early June for PO placed by 5/22. Early July|Y
01|250530|1|2|for PO placed after.|Y
01|250552|1|1|Non-cancellable non-returnable after receipt of a PO|Y
01|250552|8|1|Non-cancellable non-returnable after receipt of a PO|Y
01|250553|1|1|1st Batch/S#1018602 K-Oklahoma/Tinker 2/17/26:DWG APRV|N
01|250553|2|1|1st Batch *Please provide the drawingMFG5/20UPD5/7|N
01|250568|12|1|Currently two (2) in stock at the factory.  Estimated|Y
01|250568|12|2|lead time for the -AA-IDU version is TBD.|Y
01|250575|1|1|Please Note: Delivery is based upon receipt of order.|Y
01|250579|1|1|Additional 20% Overstock Promo discount applied|Y
01|250579|1|2|**non-cancellable non-returnable**|Y
01|250580|1|1|FOR 2 MACHINE ORDER.  GENOS M560V|Y
01|250580|5|1|Made 5% Concession to combat 60% discount from|N
01|250580|5|2|Sandvik and Kennametal. -danas|N
01|250587|1|1|This item is non standard stock once an order is|Y
01|250587|1|2|placed it cannot be cancelled or returned|Y
01|250587|2|1|Please note the ER25 has a collet capacity of 2-16mm|Y
01|250609|1|1|CNCZ302TFA-8+1PRJ (Ref. SN 6812)|Y
01|250609|1|2|RTable HiSpeed 300mm AirBrake Fanuc TopMT 8pRJ w/o Mtr|Y
01|250609|1|3|Lead time: 3.5mo mfg + Ship(Boat 1.5mo)|Y
01|250609|1|4|NET Price. SP Order Item. Orders cannot be canceled|Y
01|250609|1|5|after confirmation.|Y
01|250609|1|6|MOQ: 5units|Y
01|250609|1|7|NOTE: CNCZ302T has been discontinued but orders are|Y
01|250609|1|8|still available for Qty of 5 units or more.|Y
01|250609|2|1|Lead time: 5.5mo (3.5mo mfg + Ship by boat 1.5-2.0mo)|Y
01|250609|2|2|NET Price. SP Order Item. Orders cannot be canceled|Y
01|250609|2|3|after confirmation.|Y
01|250614|2|1|1-pc End of June / 3-pcs 3~4 Weeks|Y
01|250628|1|1|**Non-cancellable non-returnable custom item**|Y
01|250628|2|1|LN to thread blank drawscrew after receipt of spindle|Y
01|250628|2|2|specs|Y
01|250628|2|3|**NET PRICE**|Y
01|250635|1|1|TAM211014|Y
01|250641|1|1|Delivery is based upon receipt of order.|Y
01|250657|2|1|C4006-25-6.00|Y
01|250676|1|1|Table and motors only no external cables included.|Y
01|250695|1|1|T/P Inspection Required|Y
01|250695|2|1|T/P Inspection Required|Y
01|250698|2|1|power and feedback cable set from nikken table to haas|Y
01|250698|2|2|bulkhead|Y
01|250711|1|1|Installed with PS-123E|Y
01|250711|2|1|Installed in NC5-46-SK20C-90|Y
01|250719|1|1|T/P Inspection Required|Y
01|250719|2|1|T/P Inspection Required|Y
01|250719|3|1|T/P Inspection Required|Y
01|250719|4|1|T/P Inspection Required|Y
01|250719|5|1|T/P Inspection Required|Y
01|250719|6|1|T/P Inspection Required|Y
01|250719|7|1|T/P Inspection Required|Y
01|250719|8|1|T/P Inspection Required|Y
01|250719|9|1|T/P Inspection Required|Y
01|250719|10|1|T/P Inspection Required|Y
01|250719|11|1|T/P Inspection Required|Y
01|250719|12|1|1st Batch/T/P Inspection Required DWG:1/7 APRVED.|Y
01|250719|13|1|T/P Inspection Required|Y
01|250719|14|1|T/P Inspection Required|Y
01|250719|15|1|T/P Inspection Required|Y
01|250719|16|1|T/P Inspection Required|Y
01|250725|3|1|Delivery is 8 weeks MFG + 2 weeks shipping.  This item|Y
01|250725|3|2|is non-standard stock and considered special. Once an|Y
01|250725|3|3|order is placed it may not be cancelled or returned.|Y
01|250725|3|4|Price quoted is NET price to Vallen in Qty 1-9 and 10+|Y
01|250751|1|1|5AX-230HFA-M|Y
01|250751|1|2|HIGH COLUMN ROTARY TABLE WITH HEIDENHAIN SCALES|Y
01|250751|1|3|ON TILT AND ROTARY AXIS|Y
01|250761|1|1|With main sub (MS) tool there are 2 wedge sets per|Y
01|250761|1|2|tool block.|Y
01|250769|1|1|1 pc in stock in usa|Y
01|250769|2|1|4 in stock in us|Y
01|250790|1|1|part# H80F-ER16-6.00B-IDI|Y
01|250790|1|2|HSK80F ER16 6 Collet Chuck Balanced & Balanceable|Y
01|250790|1|3|BuitInChip BIS-C-122-04/L w/ Pan Head Screws|Y
01|250790|1|4|Rego Nut #3416.00000 and Coolant Tube|Y
01|250790|1|5|with Makino Pins|Y
01|250790|1|6|**Orizon Spec|Y
01|250790|1|7|Delivery: 12-14wks after receipt of PO and signed|Y
01|250790|1|8|approval drawing.|Y
01|250796|12|1|Currently two (2) in stock at the factory.  Estimated|Y
01|250796|12|2|lead time for the -AA-IDU version is TBD.|Y
01|250802|3|1|Customer will need the wrenches for the ICE tool|Y
01|250803|1|1|Additional 20% Overstock Promo discount applied|Y
01|250803|1|2|**non-cancellable non-returnable**|Y
01|250803|2|1|Applicable to SCM1045CL only|Y
01|250809|2|1|Quoted at NET price. Customer will need the wrenches|Y
01|250809|2|2|for the ICE tool please add to the PO at no charge.|Y
01|250819|1|1|with RT-TAT105SD-6+1-R|Y
01|250824|9|1|nut swap required|N
01|250824|59|1|LN437 TORQUE POSTER|Y
01|250826|2|1|Custom tombstone for EC1600|Y
01|250826|2|2|BP2-260525-1|Y
01|250826|2|3|Custom cast iron tombstone per the model:  Includes|Y
01|250826|2|4|pockets for ZPunits side windows with covers - based|Y
01|250826|2|5|on BP10 800800-1000|Y
01|250826|3|1|Custom air transfer plug for ZP120 Pot|Y
01|250826|3|2|PT-260525-1|Y
01|250826|3|3|Pneumatic connector bushing for ZP.|Y
01|250827|1|1|NET PRICE|Y
01|250827|1|2|Non-cancellable non-returnable after receipt of order|Y
01|250834|3|1|Item is from LN used shelf and is in perfect condition.|Y
01|250835|2|1|Alternative for C6-C1-90-IDU|Y
01|250840|1|1|Currenlty 39 in stock in Illinois estimated lead time|Y
01|250840|1|2|for the balance is TBD.|Y
01|250842|3|1|Overstock item NCNR|Y
01|250844|1|1|Display Unit - Cannot be cancelled or returned|Y
01|250844|1|2|after invoicing.|Y
01|250847|1|1|Special-non-standard stock - cannot be cancelled or|Y
01|250847|1|2|returned after receipt of PO|Y
01|250853|1|1|QCFC65-50M-SMO|Y
01|250853|1|2|Quick Change Flex Collet 65 Round Smooth 50mm|Y
01|250853|2|1|QCFC65-55M-SMO|Y
01|250853|2|2|Quick Change Flex Collet 65 Round Smooth 55mm|Y
01|250853|3|1|QCFC65-60M-SMO|Y
01|250853|3|2|Quick Change Flex Collet 65 Round Smooth 60mm|Y
01|250853|4|1|QCFC65-65M-SMO|Y
01|250853|4|2|Quick Change Flex Collet 65 Round Smooth 65mm|Y
01|250853|5|1|QCFC100-70M-SMO|Y
01|250853|5|2|Quick Change Flex Collet 100 Round Smooth 70mm|Y
01|250853|6|1|QCFC100-75M-SMO|Y
01|250853|6|2|Quick Change Flex Collet 100 Round Smooth 75mm|Y
01|250853|7|1|QCFC100-90M-SMO|Y
01|250853|7|2|Quick Change Flex Collet 100 Round Smooth 90mm|Y
01|250870|5|1|The non -AA is to be sold first currently have 5|Y
01|250870|5|2|in stock in Illinois.|Y
01|250870|6|1|Currently 9 of the -AA in stock in Illinois.|Y
01|250870|8|1|Currently 9 in stock in Illinois with the balance of|Y
01|250870|8|2|5 in stock at the factory.  Estimated lead time is|Y
01|250870|8|3|2~3 weeks after receipt of an order.|Y
01|250870|10|1|Currently have 3 in stock in Illinois with the balance|Y
01|250870|10|2|currently available at the factory.  Estimated lead|Y
01|250870|10|3|time is 2~3 weeks after receipt of an order.|Y
01|250870|12|1|Currently 4 in stock in Illinois.  Estimated lead time|Y
01|250870|12|2|on the balance is 18~20 weeks after receipt of an|Y
01|250870|12|3|order.|Y
01|250876|2|1|Please note additional 20% applied per overstock promo.|Y
01|250876|2|2|Once PO/order issued these cannot be cancelled or|Y
01|250876|2|3|returned.|Y
01|250880|6|1|Charge for training is dependant on location info|Y
01|250882|2|1|Included With Shrink Fit Unit.|Y
01|250882|5|1|Included With Shrink Fit Unit.|Y
01|250882|6|1|Included With Shrink Fit Unit.|Y
01|250882|7|1|Included With Shrink Fit Unit.|Y
01|250883|1|1|Includes Nikken AR21 control with pendant power cable|Y
01|250883|1|2|and external cables.|Y
01|250891|1|1|Currently have three (3) in stock in Illinois and lead|Y
01|250891|1|2|time is 1 week.  For the balance we are looking at|Y
01|250891|1|3|delivery of end of September/beginning of October.|Y
01|250893|1|1|RGA#CUR-62982/|Y
01|250893|1|2|Repair of C50FHM-ER32-215ICE-110TP (Mim#178139)|Y
01|250893|2|1|Replace bearings seals o-rings Locating pin ER32|Y
01|250893|2|2|Spindle Housing and Cover and Sealing Threadring.|Y
01|250895|1|1|BMT45-C3-ICE|Y
01|250895|1|2|BMT45; CAPTO C3 OUTPUT; INTERNAL/EXTERNAL COOLANT|Y
01|250895|2|1|BMT45-C3Z-ICE-65|Y
01|250895|2|2|BMT45; CAPTO C3 OUTPUT; INTERNAL/EXTERNAL COOLANT|Y
01|250895|2|3|TOOL HAS A 65MM CENTER HEIGHT|Y
01|250899|5|1|Okuma BMT60 Live SK25 Z <Axial> 90D ICE|Y
01|250899|6|1|Okuma BMT60 Live SK25 Z <Axial> Main Sub ICE|Y
01|250899|7|1|Okuma BMT60 Live SK25 X ICE|Y
01|250910|1|1|BT30 32mm Shell Mill Holder CoolantPorts 60mm G/l|Y
01|250910|1|2|Quantity Breaks:|Y
01|250910|1|3|2+ pcs: $174.00/EA|Y
01|250910|1|4|4+ pcs: $164.00/EA|Y
01|250913|1|1|RE: 2 table requests for Honda Transmission plant (|Y
01|250913|1|2|1 - follow-up)Jay Doute | Customer Service Representati|Y
01|250913|3|1|CNC400HFA-6+2|Y
01|250913|3|2|Rotary Table 400mm HydBrake Fanuc Horizontal w/o Motor|Y
01|250913|3|3|W/6+2 port rotary joint - TCA-59018_2|Y
01|250923|5|1|Quoted at NET price.|Y
01|250923|11|1|Quoted at NET price.|Y
01|250946|1|1|Okuma BMT60 Static Holder C5|Y
01|250946|1|2|Similar to Sandvik item C5-TRI-OK60B|Y
01|250946|2|1|Okuma BMT60 Static Holder C5|Y
01|250946|2|2|Similar to Sandvik item C5-TRE-OK60B|Y
01|250952|1|1|Additonal 20% discount has been applied for our|Y
01|250952|1|2|Overstock Promotion.  Once a Purchase Order has been|Y
01|250952|1|3|received this item cannot be cancelled or returned.|Y
01|250954|10|1|Quoted at NET pricing|Y
01|250957|1|1|Please Note: Completed questionnaire is required for|Y
01|250957|1|2|application approval along with the signed customer|Y
01|250957|1|3|agreement form.|Y
01|250957|1|4|the spindle speeder will be non-returnable.|Y
01|250957|2|1|Quoted as Net|Y
01|250966|1|1|Table with motor and external cables.|Y
01|250977|5|1|REPLACES SKN-10BJ|Y
01|250999|1|1|Currently one (1) in stock in Illinois.  Estimated|Y
01|250999|1|2|lead time for the balance is mid/end July.|Y
01|251014|1|1|RGA#LVR-62992/|Y
01|251014|1|2|Declined Repair of MZMP46-ER32Z-C SN:41340-03|Y
01|251014|1|3|LN to dispose of unit.|Y
01|251016|1|1|Currently three in stock in Illinois with additional|Y
01|251016|1|2|stock at the factory with a 1~2 week lead time.|Y
01|251022|5|1|Estimated lead time is 3~5 days after design approval.|Y
01|251022|5|2|QUOTED AT NET PRICING.|Y
01|251027|1|1|BT40-SF0375-3.54CP-DIN-M|Y
01|251027|1|2|BT40 Shrink Fit Holder 3/8 CoolantPorts 25K W/DIN|Y
01|251038|1|1|Currently three in stock in Illinois with additional|Y
01|251038|1|2|stock at the factory with a 1~2 week lead time.|Y
01|251052|1|1|Currently three in stock in Illinois with additional|Y
01|251052|1|2|stock at the factory with a 1~2 week lead time.|Y
01|251057|2|1|Additional 20% discount applied for Overstock|Y
01|251057|2|2|Promotion.  Once a Purchase Order is received this|Y
01|251057|2|3|item cannot be cancelled or returned.|Y
01|251062|1|1|TAM211014|Y
01|251065|1|1|Alternative for NIT50-SK10C-105|Y
01|251065|1|2|Net pricing|Y
01|251065|2|1|Net pricing|Y
01|251065|3|1|Net pricing|Y
01|251065|4|1|Alternative for NIT50-SK16C-105|Y
01|251065|4|2|Net pricing|Y
01|251065|5|1|IT50-SK16-135|Y
01|251065|5|2|Alternative to NIT50-SK16C-135|Y
01|251065|5|3|Net pricing|Y
01|251065|6|1|IT50-SK16-165|Y
01|251065|6|2|Alternative to NIT50-SK16C-165|Y
01|251065|6|3|Net pricing|Y
01|251068|8|1|The 11mm R8 Collet (820-011) is out of stock and|Y
01|251068|8|2|estimated delivery is end June/mid July.|Y
01|251068|8|3|All other R8 collets in this set are currently in|Y
01|251068|8|4|stock.|Y
01|251069|1|1|Discontinued - non-cancellable non-returnable|Y
01|251072|1|1|Repair/Rebuild Brake CNCZ180 SN 25276T|Y
01|251072|1|2|25275T 25267T 25268T|Y
01|251086|1|1|SN:28046T EU:Turn-Key Solutions|Y
01|251086|1|2|RGA#TAR-63023 CNCZ180LSA-BR2|Y
01|251087|1|1|**NET PRICE** 16C Hex Collet 10mm  MOQ 2 PIECES|Y
01|251087|1|2|SPECIAL - cannot be cancelled or returned upon receipt|Y
01|251087|1|3|of a PO|Y
01|251087|1|4|DELIVERY: 7-8 weeks|Y
01|251087|1|5|for mfg + shipping after approval drawing is signed|Y
01|251087|1|6|and returned.|Y
01|251092|1|1|Micatic: 181280|Y
01|251106|3|1|Alternative of C6-SK6-90-EU|Y
01|251114|1|1|Additional 20% Overstock Promo discount applied.|Y
01|251114|1|2|Non-cancellable non-returnable item.|Y
01|251117|1|1|Net pricing|Y
01|251119|1|1|U-Tool per print|Y
01|251119|2|1|U-Tool per print|Y
01|251119|3|1|U-Tool per print|Y
01|251125|1|1|SN:1250 EU:Thomas Precision Machining|Y
01|251125|1|2|RGA#TAR-63012 NST250|Y
01|251132|1|1|DISCONTINUED - NONCANCELLABLE NONRETURNABLE|Y
01|251132|1|2|**One-time Special Discount applied**|Y
01|251132|3|1|Final Part# CAT50-C3/4F-105UG-IDU-M  **NET PRICE**|Y
01|251132|3|2|CAT50 Milling Chuck 3/4 DIN ChipHole_Mod 20K HiSpeed|Y
01|251132|3|3|**CUSTOM - Non-cancellable Non-returnable**|Y
01|251139|2|1|If they cannot wait for H63A-SF0500-4.72CP maybe they|Y
01|251139|2|2|can use this.|Y
01|251148|1|1|18 AVAILABLE|Y
01|251148|2|1|25 AVAILABLE|Y
01|251148|3|1|31 AVAILABLE|Y
01|251148|4|1|3 AVAILABLE|Y
01|251152|1|1|**NET PRICE**  Mimatic part# 162913|Y
01|251152|4|1|**NET PRICE** Mimatic Part# 171063|Y
01|251156|1|1|H40A-SF12-155 - HSK40A Shrink Fit Holder 12mm 155GL|Y
01|251156|3|1|H40A-SF12-155 - HSK40A Shrink Fit Holder 12mm 155GL|Y
01|251172|1|1|RGA#TOR-63004/|Y
01|251172|1|2|Repair of 2x CAT50-C1.1/4-105U-IDU.|Y
01|251172|1|3|Clean internal components replace needle rollers and|Y
01|251172|1|4|regrease Chuck.|Y
01|251185|14|1|These are non-standard stock and considered special.|Y
01|251185|14|2|Once PO or order issued these cannot be cancelled or|Y
01|251185|14|3|returned.|Y
01|251185|15|1|NCAT40-SK6C-150U-J-IDU - these are non-standard stock|Y
01|251185|15|2|and have been quoted at special net price. Once PO or|Y
01|251185|15|3|order issued these cannot be cancelled or returned.|Y
01|251189|1|1|This ITEM is non-stock standard item and considered|Y
01|251189|1|2|special.Once PO has been placed it cannot be cancelled|Y
01|251189|1|3|or returned.|Y
01|251194|1|1|No Ins Required.|Y
01|251194|2|1|No Ins Required.|Y
01|251194|3|1|No Ins Required.|Y
01|251194|4|1|No Ins Required.|Y
01|251194|5|1|No Ins Required.|Y
01|251194|6|1|No Ins Required.|Y
01|251201|1|1|THRU HOLE 63.5MM; MAXIMUM WEIGHT CAPACITY 100KG|Y
01|251206|1|1|Special one time price for show table.|Y
01|251208|1|1|Nakamura Live ER25 X<Radial>STRT IntExtCoolant7MP 6.5K|Y
01|251208|1|2|NT55-ER25X-ICE|Y
01|251208|1|3|Delivery of 12~14 weeks for this tool is based upon|Y
01|251208|1|4|receipt of a Purchase Order after final signed approval|Y
01|251208|1|5|drawing has been received.  This tooling is special|Y
01|251208|1|6|non-standard stock and once a Purchase Order has been|Y
01|251208|1|7|placed it cannot be cancelled or returned.|Y
01|251208|1|8|QUOTED AT NET PRICING.|Y
01|251208|5|1|Nakamura Live ER25 Z<Axial>90D IntExtCoolant7MP 6.5K|Y
01|251208|5|2|NT55-ER25Z-ICE|Y
01|251208|5|3|Currently one (1) in stock at the factory.|Y
01|251208|5|4|Please note that estimated delivery of 8~10 weeks is|Y
01|251208|5|5|based upon receipt of a Purchase Order after final|Y
01|251208|5|6|signed approval drawing has been received.  This|Y
01|251208|5|7|tooling is special non-standard stock and once a|Y
01|251208|5|8|Purchase Order has been placed it cannot be cancelled|Y
01|251208|5|9|or returned.|Y
01|251208|5|10|QUOTED AT NET PRICING.|Y
01|251218|1|1|Estimated lead time is 12~14 weeks after receipt of an|Y
01|251218|1|2|order.|Y
01|251226|1|1|Please Note: BT40-SZF25-120 is non standard stock.|Y
01|251226|1|2|Once a purchase order is placed it cannot be cancelled|Y
01|251226|1|3|or returned.|Y
01|251239|1|1|HSK63F SHELL MILL 1.25 ARBOR|Y
01|251239|1|2|HSK63F  Shell Mill  Moulder Head Arbor x 1.25 pilot -|Y
01|251239|1|3|- 3.74 GL|Y
01|251239|2|1|HSK63F SHELL MILL 1.25 ARBOR|Y
01|251239|2|2|HSK63F  Shell Mill  Moulder Head Arbor x 1.25 pilot -|Y
01|251239|2|3|- 3.74 GL|Y
01|251239|4|1|HSK63 SHELL MILL 1.25 ARBOR|Y
01|251239|4|2|HSK63F Shell Mill Moulder Head Arbor x 1.25 pilot -|Y
01|251239|4|3|3.94 GL|Y
01|251239|5|1|HSK63 SHELL MILL 1.25 ARBOR|Y
01|251239|5|2|HSK63F Shell Mill Moulder Head Arbor x 1.25 pilot -|Y
01|251239|5|3|3.94 GL|Y
01|251251|3|1|2 in stock...11 weeks manufacturing and delivery time|Y
01|251251|3|2|for 3 pieces.|Y
01|251251|7|1|Please allow 12 weeks for manufacturing after signed|Y
01|251251|7|2|approval drawing. These are non-standard stock and have|Y
01|251251|7|3|been quoted at special net price. Once PO/order issued|Y
01|251251|7|4|these cannot be cancelled or returned.|Y
01|251251|9|1|Please allow 12 weeks for manufacturing after signed|Y
01|251251|9|2|approval drawing. These are non-standard stock and have|Y
01|251251|9|3|been quoted at special net price. Once PO/order issued|Y
01|251251|9|4|these cannot be cancelled or returned.|Y
01|251255|1|1|Additional 20% Overstock Promo applied. Cannot be|Y
01|251255|1|2|cancelled or returned upon receipt of a PO.|Y
01|251284|1|1|Customer sending in 6x - C4006-0125-2.36 to have|Y
01|251284|1|2|modification of Jet Slots|Y
01|251290|2|1|HSK50A-SK16C-120P|Y
01|251290|2|2|HSK50A Slim Chuck SK16 HiSpeed 25K|Y
01|251299|1|1|1 pc in stock in usa|Y
01|251299|2|1|4 in stock in us|Y
01|251301|1|1|For custom application - cannot be cancelled or|Y
01|251301|1|2|returned upon receipt of a PO|Y
01|251301|2|1|Delivery is 1 week after receipt of spindle specs|Y
01|251301|2|2|necessary for design.|Y
01|251301|2|3|**non-cancellable non-returnable**|Y
01|251303|1|1|RGA#LVR-62880/|Y
01|251303|1|2|Repair of MNL12-ER32Z-MS SN:A0391 (Alps #T32216)|Y
01|251303|2|1|Drive shaft gears bearings o-rings collet nuts and|Y
01|251303|2|2|small parts to be replaced.|Y
01|251303|4|1|RGA#LVR-62880/|Y
01|251303|4|2|Repair of MNL12-ER32Z-MS SN:A2533 (Alps #T32216)|Y
01|251303|5|1|Drive shaft bearings o-rings collet nuts and small|Y
01|251303|5|2|parts to be replaced.|Y
01|251309|1|1|CAT50-SF20-7.87CP - CAT50 20mm Shrink Fit 7.87 GL|Y
01|251309|1|2|Please allow 12 weeks after signed approval drawing for|Y
01|251309|1|3|manufacturing. These are considered special and cannot|Y
01|251309|1|4|be cancelled or returned upon PO/order.|Y
01|251310|1|1|SN:5024 EU: Millat Industries|Y
01|251310|1|2|RGA#TAR-62989 5AX-201YA-M|Y
01|251318|5|1|Alternative for CAT40-C1-85U-IDU|Y
01|251320|4|1|This item is at no charge and requires instapacks|Y
01|251320|4|2|inserted into the case.|Y
01|251323|1|1|SN:4188 EU:Spartan Light Metal Products|Y
01|251323|1|2|RGA#TAR-62981 5AX-201FA-M-AB|Y
01|251324|1|1|RFID BIS-C-122-04/L installed and holder|Y
01|251324|1|2|re-balanced. Holder and packaging etched with AC003001|Y
01|251324|1|3|Quoted at NET price.|Y
01|251327|1|1|Req.INS/Check Key&Screws are equipped/REPEAT S#1036578|Y
01|251327|2|1|Req.INS/OD Groove frange Dia issue|Y
01|251327|3|1|Req.INS/OD Groove frange Dia issue|Y
01|251339|1|1|Request is for 15mm or .591 >> Range: 0.531~0.594|Y
01|251339|2|1|Request is for 19mm or .748 >> Range: 0.719~0.781|Y
01|251339|3|1|Request is for 20mm or .787 >> Range: 0.750~0.812|Y
01|251339|4|1|Request is for 24mm or .945 >> Range: 0.906~0.969|Y
01|251339|5|1|Request is for 30mm or 1.181 >> Range: 1.125~1.187|Y
01|251339|6|1|Request is for 31mm or 1.220 >> Range: 1.188~1.250|Y
01|251339|7|1|Request is for 38mm or 1.496 >> Range: 1.438~1.500|Y
01|251339|8|1|Request is for 39mm or 1.535 >> Range: 1.500~1.562|Y
01|251339|9|1|Request is for 48mm or 1.890 >> Range: 1.844~1.906|Y
01|251339|10|1|Request is for 49mm or 1.924 >> Range: 1.875~1.937|Y
01|251339|11|1|Request is for 61mm or 2.402>> Range: 2.344~2.406|Y
01|251339|22|1|QCFC65-15M-SMO|Y
01|251339|22|2|Quick Change Flex Collet 65 Round Smooth  15mm|Y
01|251339|23|1|QCFC65-19M-SMO|Y
01|251339|23|2|Quick Change Flex Collet 65 Round Smooth  19mm|Y
01|251339|24|1|QCFC65-20M-SMO|Y
01|251339|24|2|Quick Change Flex Collet 65 Round Smooth  20mm|Y
01|251339|25|1|QCFC65-24M-SMO|Y
01|251339|25|2|Quick Change Flex Collet 65 Round Smooth  20mm|Y
01|251339|26|1|QCFC65-30M-SMO|Y
01|251339|26|2|Quick Change Flex Collet 65 Round Smooth  30mm|Y
01|251339|27|1|QCFC65-31M-SMO|Y
01|251339|27|2|Quick Change Flex Collet 65 Round Smooth  31mm|Y
01|251339|28|1|QCFC65-38M-SMO|Y
01|251339|28|2|Quick Change Flex Collet 65 Round Smooth  38mm|Y
01|251339|29|1|QCFC65-39M-SMO|Y
01|251339|29|2|Quick Change Flex Collet 65 Round Smooth  39mm|Y
01|251339|30|1|QCFC65-48M-SMO|Y
01|251339|30|2|Quick Change Flex Collet 65 Round Smooth  48mm|Y
01|251339|31|1|QCFC65-61M-SMO|Y
01|251339|31|2|Quick Change Flex Collet 65 Round Smooth  61mm|Y
01|251354|4|1|NBT50-SK10C-225|Y
01|251361|1|1|SN:20491T EU:X-Cel Technologies Inc.|Y
01|251361|1|2|RGA#TAR-63096 CNCZ180LYA-BR-QT|Y
01|251366|1|1|SN:20492T EU:X-Cel Technologes Inc.|Y
01|251366|1|2|RGA#TAR-63097 CNCZ180LYA-BR-QT|Y
01|251373|1|1|Estimated delivery is early August.|Y
01|251374|1|1|These are non-standard items and considered specials.|Y
01|251374|1|2|Once a PO has been issued these items cannot be|Y
01|251374|1|3|cancelled or returned.|Y
01|251382|1|1|MFG 7 weeks ARO|Y
01|251382|1|2|These are non-standard items and considered specials.|Y
01|251382|1|3|Once a PO has been issued these items cannot be|Y
01|251382|1|4|cancelled or returned.|Y
01|251382|3|1|NC4001-16-35CP NCAT40 Dualcontact Shell Mill Holder|Y
01|251382|3|2|16mm 20K w/Coolant Ports|Y
01|251382|3|3|These are non-standard items and considered specials.|Y
01|251382|3|4|Once a PO has been issued these items cannot be|Y
01|251382|3|5|cancelled or returned.|Y
01|251382|3|6|MFG 7 weeks ARO|Y
01|251385|4|1|Non-standard stock - cannot be cancelled or returned|Y
01|251385|5|1|Non-standard stock - cannot be cancelled or returned|Y
01|251385|6|1|Non-standard stock - cannot be cancelled or returned|Y
01|251395|2|1|MCAT40-C3/4F-120U is on our Overstock list.|Y
01|251405|1|1|RGA#LVR-62986/|Y
01|251405|1|2|Repair of BMT65-C5Z-ICE-100 SN:2490028811 (Mim#201308)|Y
01|251405|2|1|Bearings seals and o-rings to be replaced|Y
01|251407|3|1|NET Price Only - Each price is for one APC machine.|Y
01|251410|1|1|Req.INS/Install E40-NUT|Y
01|251410|2|1|Req.INS/OD Groove frange Dia issue|Y
01|251410|3|1|Req.INS/OD Groove frange Dia issue|Y
01|251410|4|1|Req.INS/OD Groove frange Dia issue|Y
01|251410|5|1|Req.INS/OD Grv frange Dia/Install E32-NUT/ER32-SCREW(C)|Y
01|251410|6|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|251410|7|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|251415|8|1|Presetter Spindle NC5|Y
01|251415|9|1|Presetter Master Gauge NC5|Y
01|251423|1|1|**Non-cancellable non-returnable item**|Y
01|251423|1|2|**Must ship via Freight**|Y
01|251425|1|1|We currently have eight (8) in stock in Illinois with|Y
01|251425|1|2|additional stock at the factory.  Estimated lead time|Y
01|251425|1|3|for over 8 pieces is approximately 1~2 weeks after|Y
01|251425|1|4|receipt of an order.|Y
01|251430|5|1|HSK40E-R0875-3.31 - HSK40E Rigid Tap Holder #2|Y
01|251430|5|2|Please allow 7 weeks manufacturing after signed|Y
01|251430|5|3|approval drawing received. These are non-standard stock|Y
01|251430|5|4|and have been quoted at special net price. Once PO or|Y
01|251430|5|5|order issued these cannot be cancelled or returned.|Y
01|251436|1|1|Please note that these jaws are sold as complete sets.|Y
01|251436|1|2|(Qty. 1 = set of 3 jaws)|Y
01|251443|2|1|ONE TIME USE ONLY. REMOVING THEM DESTROYS THEM.|Y
01|251443|2|2|SOLD IN PACKAGES OF 50.  6 NEEDED PER ZERO POINT BASE|Y
01|251443|7|1|16MM T-SLOT - M12x1.75 T NUT|Y
01|251443|8|1|M12x1.75 SHCS - 50MM LONG|Y
01|251443|9|1|T SLOT COVER - 40 FEET TOTAL|Y
01|251443|9|2|VERIFY VM3 HAS T SLOTS OR GRID TABLE|Y
01|251443|10|1|2 AIR FITTINGS AND 6MM AIR LINE TO PLUMB|Y
01|251443|10|2|WH-ZP120-BASE6-P200 TO AIR SUPPLY AT BACK OF MACHINE|Y
01|251444|2|1|C6-SK10-90P-IDU|Y
01|251444|2|2|PSC C6 Slim Chuck SK10 HiSpeed 30K|Y
01|251444|4|1|C6-SK16-120P-IDU|Y
01|251444|4|2|PSC C6 Slim Chuck SK16 HiSpeed 30K|Y
01|251447|2|1|NBT30 DualContact Hydraulic Chuck 8 MM|Y
01|251447|2|2|NBT30-HC08-64|Y
01|251447|3|1|NBT30 DualContact Hydraulic Chuck 9 MM|Y
01|251447|3|2|NBT30-HC12-72 w/reducer from 12 mm to 9 mm|Y
01|251447|3|3|The price included the reducer|Y
01|251447|4|1|NBT30 DualContact Hydraulic Chuck 14 MM|Y
01|251447|4|2|NBT30-HC14-70|Y
01|251447|5|1|NBT30 DualContact Hydraulic Chuck 16 MM|Y
01|251447|5|2|NBT30-HC16-90|Y
01|251451|1|1|HSK63C-HC12-75|Y
01|251451|1|2|HSK63C Hydraulic Chuck 12mm|Y
01|251451|2|1|HSK63A-HC25-120|Y
01|251451|2|2|HSK63A Hydraulic Chuck 25mm|Y
01|251451|3|1|HSK63C-HC16-80|Y
01|251451|3|2|HSK63C Hydraulic Chuck 16mm|Y
01|251451|4|1|HSK50C-HC10-65|Y
01|251451|4|2|HSK50C Hydraulic Chuck 10mm|Y
01|251451|5|1|HSK50C-HC18-80|Y
01|251451|5|2|HSK50C Hydraulic Chuck 18mm|Y
01|251451|6|1|HSK50C-HC16-80|Y
01|251451|6|2|HSK50C Hydraulic Chuck 16mm|Y
01|251451|7|1|HSK63A-HC06-80|Y
01|251451|7|2|HSK63A Hydraulic Chuck 06 MM|Y
01|251473|2|1|Value of a $2000 Tooling Certificate|Y
01|251479|1|1|Collet sizes included: SK16-1/4A SK16-1/2A SK16-3/8A|Y
01|251483|2|1|Additional 20% discount applied for our Overstock|Y
01|251483|2|2|Promotion.  Once a Purchase Order has been received|Y
01|251483|2|3|this item cannot be cancelled or returned.|Y
01|251485|2|1|We currently have one (1) in stock in Illinois with|Y
01|251485|2|2|additional stock at the factory.  Estimated lead time|Y
01|251485|2|3|for more than one piece is 1~2 weeks after receipt of|Y
01|251485|2|4|an order.|Y
01|251485|2|5|PLEASE ALSO CONFIRM WITH THE CUSTOMER IF THEY NEED THE|Y
01|251485|2|6|DRIVE PINS FOR THE HOLDER.|Y
01|251489|1|1|Estimated delivery 12-14 weeks ARO|Y
01|251494|10|1|Please note these are non-standard stock and considered|Y
01|251494|10|2|special. Once PO/order issused these cannot be|Y
01|251494|10|3|cancelled or returned. Upon stock depletion quantities|Y
01|251494|10|4|will need to be requoted for prive and delivery.|Y
01|251513|1|1|NCAT50-Q42-225A|Y
01|251513|1|2|NCAT50 Dual Contact Boring Base|Y
01|251524|1|1|Estimated lead time is 16~18 weeks after receipt of an|Y
01|251524|1|2|order.|Y
01|251530|1|1|SN:12246 EU:Woodward Inc.|Y
01|251530|1|2|RGA#TAR-62961 CNC202FA-M|Y
01|251549|1|1|Currently one in stock in Illinois.  Estimated lead|Y
01|251549|1|2|time for additional items is end of July/early August.|Y
01|251558|8|1|Presetter adapte NC5-46|Y
01|251559|1|1|Estimated lead time is mid/end July.|Y
01|251565|7|1|Please note these are non-standard stock and considered|Y
01|251565|7|2|special. Once PO/order issued these can't be cancelled|Y
01|251565|7|3|or returned.|Y
01|251566|1|1|Net pricing|Y
01|251566|4|1|Net pricing|Y
01|251566|7|1|Net pricing|Y
01|251571|1|1|HSK63C-HC12-75|Y
01|251571|1|2|HSK63C Hydraulic Chuck 12mm|Y
01|251571|2|1|HSK63A-HC25-120|Y
01|251571|2|2|HSK63A Hydraulic Chuck 25mm|Y
01|251571|3|1|HSK63C-HC16-80|Y
01|251571|3|2|HSK63C Hydraulic Chuck 16mm|Y
01|251571|4|1|HSK50C-HC10-65|Y
01|251571|4|2|HSK50C Hydraulic Chuck 10mm|Y
01|251571|5|1|HSK50C-HC18-80|Y
01|251571|5|2|HSK50C Hydraulic Chuck 18mm|Y
01|251571|6|1|HSK50C-HC16-80|Y
01|251571|6|2|HSK50C Hydraulic Chuck 16mm|Y
01|251571|7|1|HSK63A-HC06-80|Y
01|251571|7|2|HSK63A Hydraulic Chuck 06 MM|Y
01|251572|1|1|Please note these are non-standard stock and considered|Y
01|251572|1|2|special. Once PO/order issued these can't be cancelled|Y
01|251572|1|3|or returned.|Y
01|251588|1|1|Discount based on 2 sets|Y
01|251591|2|1|2 tools in stock at L-N/ 3-pcs 2~3 Weeks/Bal Pending|Y
01|251597|1|1|Special Overstock discount applied. This item is|Y
01|251597|1|2|non-returnable.|Y
01|251600|1|1|This includes drive units sheet metal junction box|Y
01|251600|1|2|cables.|Y
01|251603|13|1|For Tapping|Y
01|251613|1|1|Estimated lead time for 40 holders is end of July/early|Y
01|251613|1|2|August.  Then lead time for the balance is end of|Y
01|251613|1|3|October/early November.|Y
01|251613|4|1|Currently 38 in stock in Illinois.  Estimated lead|Y
01|251613|4|2|time for the balance is TBD.|Y
01|251615|1|1|Currently 47 in stock in Illinois.  Estimated lead time|Y
01|251615|1|2|for the balance is TBD.|Y
01|251678|1|1|Estimated lead time for 40 holders is end of July/early|Y
01|251678|1|2|August.  Then lead time for the balance is end of|Y
01|251678|1|3|October/early November.|Y
01|251678|4|1|Currently 38 in stock in Illinois.  Estimated lead|Y
01|251678|4|2|time for the balance is TBD.|Y
01|251679|3|1|Non-standard stock - non-cancellable/non-returnable|Y
01|251679|4|1|Non-standard stock - non-cancellable/non-returnable|Y
01|251680|1|1|Currently 47 in stock in Illinois.  Estimated lead time|Y
01|251680|1|2|for the balance is TBD.|Y
01|251681|1|1|DISCOTNINUED - non-cancellable non-returnable|Y
01|251681|3|1|DISCONTINUED - Non-cancellable non-returnable|Y
01|251685|1|1|REPLACEMENT FOR SN:5024 ON RGA# TAR-62989|Y
01|251686|1|1|C8-SF0125-3.15CP - PSC C8 Shrink Fit Holder 1/8|Y
01|251686|1|2|Coolant Ports 25K|Y
01|251686|5|1|C8-SF0187-3.15CP - PSC C8 Shrink Fit Holder 3/16|Y
01|251686|5|2|Coolant Ports 25K|Y
01|251686|9|1|CAT50-SF0125-3.15CP - CAT50 Shrink Fit Holder 1/8|Y
01|251686|9|2|Coolant Ports 25K|Y
01|251688|1|1|TNKQ2606-0503 0013 - ZDK24-24|Y
01|251688|3|1|TNKQ2606-0503 0022 - NBT30-ZDS24-120|Y
01|251688|5|1|TNKQ2606-0503 0053|Y
01|251690|3|1|Delivery: mid-July for PO placed by 6/26|Y
01|251690|5|1|Delivery: mid-July for PO placed before 6/26|Y
01|251691|1|1|Stock at factory L-N Air Cutoff is 06-26 for ETA to|Y
01|251691|1|2|Lyndex-Nikken Mid July.|Y
01|251691|2|1|Stock at factory L-N Air Cutoff is 06-26 for ETA to|Y
01|251691|2|2|Lyndex-Nikken Mid July.|Y
01|251730|28|1|Currently 7 in stock in IL est. lead time is 1 week|N
01|251730|28|2|after receiving an order.|N
01|251740|1|1|T/P Inspection Required|Y
01|251740|3|1|T/P Inspection Required|Y
01|251743|2|1|HFO  Midwest to supply Yaskawa Sigma 7 motors.|Y
01|251743|2|2|Motors to be shipped to Mundelein for assembly|Y
01|251743|2|3|HFO responsible for field installation|Y
01|251743|2|4|Duplicate project for export to MX|N
01|251743|2|5|SHIPMENT INSTRUCTIONS FOR SIGMA MOTORS...|Y
01|251743|2|6|SHIP TO: LYNDEX-NIKKEN|Y
01|251743|2|7|ATTN: RT_ENG. REF# YOUR PO#|Y
01|251743|2|8|1468 ARMOUR BLVD.|Y
01|251743|2|9|MUNDELEIN IL  60060|Y
01|251749|1|1|H125A-SF0750-4.00|Y
01|251749|1|2|HSK125A Shrink Fit Holder 3/4 Coolant Thru|Y
01|251749|2|1|H125A-SF0750-4.00|Y
01|251749|2|2|HSK125A Shrink Fit Holder 3/4 Coolant Thru|Y
01|251749|2|3|10+ PCS|Y
01|251749|4|1|H125A-SF20-105|Y
01|251749|4|2|HSK125A Shrink Fit Holder 20mm Coolant Thru|Y
01|251749|5|1|H125A-SF20-105|Y
01|251749|5|2|HSK125A Shrink Fit Holder 20mm Coolant Thru|Y
01|251749|5|3|10+ PCS|Y
01|251749|7|1|H125A-SF1000-4.00|Y
01|251749|7|2|HSK125A Shrink Fit Holder 1 Coolant Thru|Y
01|251749|8|1|H125A-SF1000-4.00|Y
01|251749|8|2|HSK125A Shrink Fit Holder 1 Coolant Thru|Y
01|251749|8|3|10+ PCS|Y
01|251749|10|1|H125A-SF25-105|Y
01|251749|10|2|HSK125A Shrink Fit Holder 25mm Coolant Thru|Y
01|251749|11|1|H125A-SF25-105|Y
01|251749|11|2|HSK125A Shrink Fit Holder 25mm Coolant Thru|Y
01|251749|11|3|10+ PCS|Y
01|251749|13|1|H125A-SF32-105|Y
01|251749|13|2|HSK125A Shrink Fit Holder 32mm Coolant Thru|Y
01|251749|14|1|H125A-SF32-105|Y
01|251749|14|2|HSK125A Shrink Fit Holder 32mm Coolant Thru|Y
01|251749|14|3|10+ PCS|Y
01|251749|16|1|H125A-SF1250-4.00|Y
01|251749|16|2|HSK125A Shrink Fit Holder 1.1/4 Coolant Thru|Y
01|251749|17|1|H125A-SF1250-4.00|Y
01|251749|17|2|HSK125A Shrink Fit Holder 1.1/4 Coolant Thru|Y
01|251749|17|3|10+ PCS|Y
01|251749|19|1|HSK125A-ER16-165|Y
01|251749|19|2|HSK125A ER16 Collet Chuck HiTorque BearingNut|Y
01|251749|20|1|HSK125A-ER16-165|Y
01|251749|20|2|HSK125A ER16 Collet Chuck HiTorque BearingNut|Y
01|251749|20|3|10+ PCS|Y
01|251749|22|1|HSK125A-1000-5.00|Y
01|251749|22|2|HSK125A End Mill Holder 1|Y
01|251749|23|1|HSK125A-1000-5.00|Y
01|251749|23|2|HSK125A End Mill Holder 1|Y
01|251749|23|3|10+ PCS|Y
01|251749|25|1|HSK125A-0750-4.00|Y
01|251749|25|2|HSK125A End Mill Holder 3/4|Y
01|251749|26|1|HSK125A-0750-4.00|Y
01|251749|26|2|HSK125A End Mill Holder 3/4|Y
01|251749|26|3|10+ PCS|Y
01|251749|28|1|HSK100A-1250-5.00|Y
01|251749|28|2|HSK125A End Mill Holder 1.1/4|Y
01|251749|29|1|HSK100A-1250-5.00|Y
01|251749|29|2|HSK125A End Mill Holder 1.1/4|Y
01|251749|29|3|10+ PCS|Y
01|251749|31|1|H125A-SF10-165|Y
01|251749|31|2|HSK125A Shrink Fit Holder 10mm Coolant Thru|Y
01|251749|32|1|H125A-SF10-165|Y
01|251749|32|2|HSK125A Shrink Fit Holder 10mm Coolant Thru|Y
01|251749|32|3|10+ PCS|Y
01|251749|34|1|HSK125A-32-125|Y
01|251749|34|2|HSK125A End Mill Holder 32mm|Y
01|251749|35|1|HSK125A-32-125|Y
01|251749|35|2|HSK125A End Mill Holder 32mm|Y
01|251749|35|3|10+ PCS|Y
01|251749|37|1|HSK125A-1500-5.00|Y
01|251749|37|2|HSK125A End Mill Holder 1.1/2|Y
01|251749|38|1|HSK125A-1500-5.00|Y
01|251749|38|2|HSK125A End Mill Holder 1.1/2|Y
01|251749|38|3|10+ PCS|Y
01|251749|40|1|HSK125A-40-125|Y
01|251749|40|2|HSK125A End Mill Holder 40mm|Y
01|251749|43|1|H125A-SF1000-6.00|Y
01|251749|43|2|HSK125A Shrink Fit Holder 1 Coolant Thru|Y
01|251749|44|1|H125A-SF1000-6.00|Y
01|251749|44|2|HSK125A Shrink Fit Holder 1 Coolant Thru|Y
01|251749|44|3|10+ PCS|Y
01|251749|46|1|HSK125A-ER25-165|Y
01|251749|46|2|HSK125A ER25 Collet Chuck HiTorque BearingNut|Y
01|251749|47|1|HSK125A-ER25-165|Y
01|251749|47|2|HSK125A ER25 Collet Chuck HiTorque BearingNut|Y
01|251749|47|3|10+ PCS|Y
01|251749|49|1|H125A-SF11-130|Y
01|251749|49|2|HSK125A Shrink Fit Holder 11mm Coolant Thru|Y
01|251749|50|1|H125A-SF11-130|Y
01|251749|50|2|HSK125A Shrink Fit Holder 11mm Coolant Thru|Y
01|251749|50|3|10+ PCS|Y
01|251749|52|1|HSK125A-ER32-135|Y
01|251749|52|2|HSK125A ER32 Collet Chuck HiTorque BearingNut|Y
01|251749|53|1|HSK125A-ER32-135|Y
01|251749|53|2|HSK125A ER32 Collet Chuck HiTorque BearingNut|Y
01|251749|53|3|10+ PCS|Y
01|251754|2|1|This item is special non-standard stock.  Once a|Y
01|251754|2|2|Purchase Order is received this item cannot be|Y
01|251754|2|3|cancelled or returned.|Y
01|251757|5|1|M120S 2012 Step Key|Y
01|251760|1|1|Estimated lead time for the complete set is|Y
01|251760|1|2|early/mid July.|Y
01|251763|4|1|The 195mm gage length has been discontinued and the|Y
01|251763|4|2|200mm gage length is the replacement.|Y
01|251773|2|1|Additional 20% discount applied for our Overstock|Y
01|251773|2|2|Promotion.  Once a Purchase Order is received this|Y
01|251773|2|3|item cannot be cancelled or returned.|Y
01|251776|1|1|This is for travel and labor only to finsih the 4th|Y
01|251776|1|2|axis installation for Common Wealth. - Customer has all|Y
01|251776|1|3|hardware components already.|Y
01|251780|4|1|Discontinued - **cannot be cancelled or returned|Y
01|251780|4|2|upon receipt of a PO**|Y
01|251781|4|1|Discontinued - non-cancellable non-returnable|Y
01|251790|6|1|16C Round Collet 0.415|Y
01|251790|7|1|16C Round Collet 0.292|Y
01|251790|8|1|16C Round Collet 0.292|Y
01|251792|1|1|FOR DMG DMU65 Monoblock|Y
01|251792|3|1|*SPINDLE DRAWING OR APPLICATION DATA SHEET REQUIRED|Y
01|251792|3|2|LEADTIME DEPENDENT ON SPINDLE DRAWING.|Y
01|251800|1|1|Table with motors and external cable sets.|Y
01|251813|1|1|Special one time price.|Y
01|251833|2|1|HSK32E 3/16 SF 2.36 gl|Y
01|251837|1|1|Max weight 1760lbs with end support|Y
01|251850|4|1|Estimated lead time is one week after design approval.|Y
01|251855|1|1|100pc minimum|Y
01|251855|3|1|100pc minimum|Y
01|251855|7|1|Qty 100-499|Y
01|251857|2|1|Estimated delivery is mid/end August after receipt of|Y
01|251857|2|2|order.|Y
01|251857|5|1|Estimated lead time is the end of July after receipt of|Y
01|251857|5|2|an order.|Y
01|251872|1|1|Net pricing|Y
01|251876|2|1|Additional 20% discount applied for our Overstock|Y
01|251876|2|2|Promotion.  Once a Purchase Order has been received|Y
01|251876|2|3|this item cannot be cancelled or returned.  We|Y
01|251876|2|4|currently have eleven (11) of these holders in stock.|Y
01|251882|1|1|Max weight 1760lbs with end support|Y
01|251889|4|1|When we get a PO need to release these manually.|N
01|251889|4|2|Internal note only.|N
01|251898|4|1|Mimatic# 192532|Y
01|251898|4|2|BT50 ER50 Right angle head Internal & External coolant|Y
01|251910|1|1|FOR DMG DMU65 Monoblock|Y
01|251910|4|1|*SPINDLE DRAWING OR APPLICATION DATA SHEET REQUIRED|Y
01|251910|4|2|LEADTIME DEPENDENT ON SPINDLE DRAWING.|Y
01|251911|8|1|Quoted at NET price.|Y
01|251914|1|1|KM32-5/8|Y
01|251914|1|2|Looking for tolerance of +0.0002/+0.0005 and|Y
01|251914|1|3|oversized shanks.|Y
01|251914|2|1|KM32-7/8|Y
01|251914|2|2|Looking for tolerance of +0.0002/+0.0005 and|Y
01|251914|2|3|oversized shanks.|Y
01|251914|3|1|KM32-1|Y
01|251914|3|2|Looking for tolerance of +0.0002/+0.0005 and|Y
01|251914|3|3|oversized shanks.|Y
01|251914|4|1|KM32-13|Y
01|251914|4|2|Looking for tolerance of +0.0002/+0.0005 and|Y
01|251914|4|3|oversized shanks.|Y
01|251914|5|1|KM32-16|Y
01|251914|5|2|Looking for tolerance of +0.0002/+0.0005 and|Y
01|251914|5|3|oversized shanks.|Y
01|251914|6|1|KM32-20|Y
01|251914|6|2|Looking for tolerance of +0.0002/+0.0005 and|Y
01|251914|6|3|oversized shanks.|Y
01|251914|7|1|KM32-25|Y
01|251914|7|2|Looking for tolerance of +0.0002/+0.0005 and|Y
01|251914|7|3|oversized shanks.|Y
01|251918|6|1|Please note additional 20% applied per overstock promo.|Y
01|251918|6|2|These are non-standard stock and considered special.|Y
01|251918|6|3|Once PO/order issued these cannot be cancelled or|Y
01|251918|6|4|returned.|Y
01|251925|1|1|#75 NH501R155 T-Slot Cover|Y
01|251925|2|1|#110 NH501R158 Round Nut|Y
01|251925|3|1|#112 Bevel Gear|Y
01|251925|4|1|#114 Distance Collar|Y
01|251925|5|1|#116 NH501R164 Stopper Bolt|Y
01|251925|6|1|#122 Winding Blade|Y
01|251925|7|1|#71 NH501R166 Dial Scale|Y
01|251925|8|1|#72 NH501R168 Scale Plate|Y
01|251925|9|1|#113 Gear Shaft|Y
01|251938|1|1|Estimated lead time is 2~3 weeks after receipt of an|Y
01|251938|1|2|order.  This item is special non-standard stock once a|Y
01|251938|1|3|Purchase Order is received this item cannot be|Y
01|251938|1|4|cancelled or returned.|Y
01|251938|2|1|Currently one (1) in stock in Illinois with estimated|Y
01|251938|2|2|lead time for the balance of 2~3 weeks after receipt of|Y
01|251938|2|3|an order.|Y
01|251938|7|1|This item is special non-standard stock once a|Y
01|251938|7|2|Purchase Order is received this item cannot be|Y
01|251938|7|3|cancelled or returned.|Y
01|251938|11|1|Estimated lead time is 14~16 weeks after receipt of an|Y
01|251938|11|2|order.  This item is special non-standard stock.  Once|Y
01|251938|11|3|a Purchase Order is received this item cannot be|Y
01|251938|11|4|cancelled or returned.|Y
01|251941|1|1|SN:1139 EU:Flex-Cell Precision Inc.|Y
01|251941|1|2|RGA#TAR-63021 5AX-DD200BF2|Y
01|251941|52|1|Grinding Fee|Y
01|251941|52|2|Pricing and Delivery TBD|Y
01|251943|1|1|**NET PRICE**  Mimatic part# 162913|Y
01|251943|1|2|SPECIAL - non-cancellable/non-returnable after receipt|Y
01|251943|1|3|of a PO|Y
01|251943|2|1|**NET PRICE**  Mimatic part# 162913|Y
01|251943|2|2|SPECIAL - non-cancellable/non-returnable after receipt|Y
01|251943|2|3|of a PO|Y
01|251943|5|1|**NET PRICE** Mimatic Part# 171063|Y
01|251943|5|2|SPECIAL - non-cancellable/non-returnable after receipt|Y
01|251943|5|3|of a PO|Y
01|251950|1|1|HSK63F-ER16-70 Balance to 36K at G2.5 ChipHole|Y
01|251950|1|2|Sistemi Klein TJ118.900.R070|Y
01|251950|1|3|DRIVE PINS ARE NEEDED.|Y
01|251950|2|1|HSK63F-ER16-100 Balance to 36K at G2.5 ChipHole|Y
01|251950|2|2|Sistemi Klein TJ118.900.R100|Y
01|251950|2|3|DRIVE PINS ARE NEEDED.|Y
01|251950|3|1|HSK63F-ER16-150 Balance to 36K at G2.5 ChipHole|Y
01|251950|3|2|Sistemi Klein TJ118.900.R150|Y
01|251950|3|3|DRIVE PINS ARE NEEDED.|Y
01|251950|12|1|HSK63F-ER32-75 Balance to 36K at G2.5 ChipHole|Y
01|251950|12|2|Sistemi Klein TJ118.976.R75|Y
01|251950|12|3|DRIVE PINS ARE NEEDED.|Y
01|251950|13|1|HSK63F-ER32-100 Balance to 36K at G2.5 ChipHole|Y
01|251950|13|2|Sistemi Klein TJ118.976.R100|Y
01|251950|13|3|DRIVE PINS ARE NEEDED.|Y
01|251976|6|1|2pcs lead time 2 weeks|Y
01|251976|6|2|Balance of 3pcs 10-12 weeks|Y
01|251976|10|1|4pcs lead time 2 weeks|Y
01|251976|10|2|Balance of 1pc 10-12 weeks|Y
01|251976|16|1|2pcs lead time 2 weeks|Y
01|251976|16|2|Balance of 3pcs 10-12 weeks|Y
01|251986|2|1|Please note additional 20% applied per overstock promo.|Y
01|251986|2|2|Once PO/order issued these cannot be cancelled or|Y
01|251986|2|3|returned. Upon stock depletion this will need to be|Y
01|251986|2|4|requoted for price and availability.|Y
01|251995|1|1|SN:6091 EU:Horizon Service|Y
01|251995|1|2|RGA#TAR-63064 CNC400HFA-6+3PRJ|Y
01|251995|24|1|Grinding Fee|Y
01|251997|1|1|Nakamura C26330 **HEX Style Nut**|Y
01|251997|6|1|Nakamura F26333 **HEX Style Nut**|Y
01|252008|4|1|Please Note: Last purchase order S2581343 customer|Y
01|252008|4|2|requested CAT40-SK20-65U-IDU. We were out of stock|Y
01|252008|4|3|so customer ordered NCAT40-SK20-50U-IDU as the|Y
01|252008|4|4|replacement. I added 20-pcs of CAT40-SK20-65U-IDU to|Y
01|252008|4|5|the quote in case they want to change back. There is|Y
01|252008|4|6|a difference in price however please check that the|Y
01|252008|4|7|gage length 65mm will work for them. Thank you|Y
01|252008|27|1|Please Note: TQW 150 is the replacement wrench for|Y
01|252008|27|2|discontinued TQW-200.|Y
01|252008|30|1|Please Note: TQW-ER32/SK20/TG75(50) is replacement for|Y
01|252008|30|2|TQW-ER32/SK20(50) which is dicontinued.|Y
01|252008|31|1|Please Note: TQW-SK25(55) is replacement for TQW-SK2560|Y
01|252008|31|2|which is discontinued.|Y
01|252012|1|1|1pc stock balance 2pcs + 1 week delivery|Y
01|252020|1|1|Estimated lead time 14~16 weeks after receipt of an|Y
01|252020|1|2|order.|Y
01|252022|3|1|CUSTOM POSITIONING BLOCK FOR MAZAK FJV|Y
01|252024|1|1|RGA#LVR-63092/|Y
01|252024|1|2|Repair of OKU-L370-Z SN:AL0056 (Alps#OK101-13000)|Y
01|252024|2|1|Spindle cover Clutch Bearings O-Rings Collet Nut|Y
01|252024|2|2|and small parts to be replaced.|Y
01|252036|1|1|Fixture plate for 4 each SK adapters. True Precision|Y
01|252036|1|2|will approve the final drawing. Once the drawing is|Y
01|252036|1|3|approved 10-12 weeks to MFG.|Y
01|252036|1|4|INCLUDES: 30MM BUSHINGS|Y
01|252036|1|5|12MM BUSHINGSweight reduction pocket removed|Y
01|252036|1|6|Metric Hardware|Y
01|252036|1|7|NET pricing|Y
01|252041|1|1|Overhaul/Repair|Y
01|252041|1|2|CNC400HFA-6+3.Serial#6091|Y
01|252041|1|3|RGA#TAR-63064|Y
01|252041|1|4|Ship to: Horizon Service|Y
01|252041|1|5|EU: Honda GA|Y
01|252041|1|6|Total Net Price of overhaul for the captioned RT|Y
01|252041|1|7|Worm Wheel & Worm Screw are re-used.|Y
01|252066|7|1|Collet quoted in place of 5/8 hydraulic chuck to use|Y
01|252066|7|2|on milling chuck CAT40-C1-105U-IDU|Y
01|252084|1|1|HSK63F-ER16-70 Balance to 36K at G2.5 ChipHole|Y
01|252084|1|2|Sistemi Klein TJ118.900.R070|Y
01|252084|1|3|DRIVE PINS ARE NEEDED.|Y
01|252084|2|1|HSK63F-ER16-100 Balance to 36K at G2.5 ChipHole|Y
01|252084|2|2|Sistemi Klein TJ118.900.R100|Y
01|252084|2|3|DRIVE PINS ARE NEEDED.|Y
01|252084|3|1|HSK63F-ER16-150 Balance to 36K at G2.5 ChipHole|Y
01|252084|3|2|Sistemi Klein TJ118.900.R150|Y
01|252084|3|3|DRIVE PINS ARE NEEDED.|Y
01|252084|12|1|HSK63F-ER32-75 Balance to 36K at G2.5 ChipHole|Y
01|252084|12|2|Sistemi Klein TJ118.976.R75|Y
01|252084|12|3|DRIVE PINS ARE NEEDED.|Y
01|252084|13|1|HSK63F-ER32-100 Balance to 36K at G2.5 ChipHole|Y
01|252084|13|2|Sistemi Klein TJ118.976.R100|Y
01|252084|13|3|DRIVE PINS ARE NEEDED.|Y
01|252085|4|1|Net pricing|Y
01|252085|4|2|Lyndex-Nikken to make position block upon receipt|Y
01|252085|4|3|of spindle drawing confirmation.|Y
01|252086|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|252086|3|2|BEING INSTALLED ON OKUMA MILLAC 852V|Y
01|252100|1|1|Part Number H10ARAM-ER40-225ICE-110TP|Y
01|252100|1|2|HSK100A ER40 Angle Head Internal Coolant|Y
01|252100|1|3|Quoted at NET price.|Y
01|252100|27|1|Part Number: H10ARAM-MI63IC-225-110TP|Y
01|252100|27|2|HSK100A MI63 Angle Head Internal Coolant|Y
01|252100|27|3|Quoted at NET price.|Y
01|252100|51|1|Quoted at NET price.|Y
01|252107|2|1|Custom tombstone for EC1600|Y
01|252107|2|2|BP2-260525-1|Y
01|252107|2|3|Custom cast iron tombstone per the model:  Includes|Y
01|252107|2|4|mounting point for 2 ZP Base plates on each side.|Y
01|252107|2|5|Includes 4 custom WH-ZP120-BASE8-P200 configured for|Y
01|252107|2|6|mounting on a tombstone.|Y
01|252107|2|7|ZPB's include sealing studs caps air block cover|Y
01|252107|2|8|8 ea ZP120s 16 ea clamping studs.|Y
01|252108|1|1|C6-ER16-150|Y
01|252108|1|2|PSC C6 ER16 Collet Chuck HiTorque BearingNut ChipHole|Y
01|252108|1|3|25K >> Minimum order quantity 5-pcs.|Y
01|252108|2|1|C6-ER16-200|Y
01|252108|2|2|PSC C6 ER16 Collet Chuck HiTorque BearingNut ChipHole|Y
01|252108|2|3|25K|Y
01|252108|4|1|C6-ER16-200|Y
01|252108|4|2|PSC C6 ER16 Collet Chuck HiTorque BearingNut ChipHole|Y
01|252108|4|3|25K|Y
01|252129|1|1|1st Batch *Please provide the drawingMFG5/20UPD5/7|N
01|252129|2|1|1st Batch *Please provide the drawingMFG5/20UPD5/7|N
01|252129|3|1|1st Batch *Please provide the drawingMFG6/20UPD5/7|N
01|252129|4|1|1st Batch/For Stock 6/10:DWG FW'd to TimRMFG6/20UPD6/1|N
01|252129|5|1|1st Batch/For Stock 6/10:DWG FW'd to TimRMFG6/20UPD6/1|N
01|252132|1|1|Special non-standard stock. Cannot be cancelled or|Y
01|252132|1|2|returned|Y
01|252141|1|1|INCLUDES: CRX20iAL|Y
01|252141|3|1|INCLUDES: CRX CABLE KIT AND COMPUTE BOX|Y
01|252144|1|1|Order must be for minimum of two pieces for additional|Y
01|252144|1|2|discount.  If only one piece is ordered the standard|Y
01|252144|1|3|discount of 10% will apply.|Y
01|252149|1|1|DISCONTINUED - Cannot be cancelled or returned|Y
01|252153|2|1|Additional 20% discount applied for our Overstock|Y
01|252153|2|2|Promotion. Once a Purchase Order has been received|Y
01|252153|2|3|this item cannot be cancelled or returned.|Y
01|252164|1|1|Discontinued - cannot be cancelled or returned|Y
01|252165|1|1|SN:28040T EU:Toth Industries|Y
01|252165|1|2|RGA#TAR-63090 CNCZ180LSA-BR2|Y
01|252178|1|1|2 week delivery on 6 pieces and 2.5 months for|Y
01|252178|1|2|manufacturing & delivery on remaining. These are|Y
01|252178|1|3|considered special. Once PO/order issued cannot be|Y
01|252178|1|4|cancelled or returned.|Y
01|252179|1|1|C4001-16-80CP - CAT40 shell mill 16mm with 80mm GL &|Y
01|252179|1|2|coolant ports.|Y
01|252183|1|1|CAT50-HC2000-4.00 - CAT50 Hydraulic Chuck 2. Please|Y
01|252183|1|2|allow 12 weeks manufacturing after signed approval|Y
01|252183|1|3|drawing received plus 3 weeks for delivery. These are|Y
01|252183|1|4|non-standard stock and have been quoted at special net|Y
01|252183|1|5|price. Once PO/order issued these cannot be cancelled|Y
01|252183|1|6|or returned. Minimum order quantity is 3 pieces.|Y
01|252183|3|1|CAT50 Hydraulic Chuck 50.8 mm (2) GL 127 mm (5).|Y
01|252183|3|2|These are non-standard stock and have been quoted at|Y
01|252183|3|3|special net price. Once PO/order issued these cannot|Y
01|252183|3|4|be cancelled or returned.|Y
01|252186|2|1|THIS IS THE ONLY ITEM THAT WILL NEED TO SHIP|Y
01|252186|2|2|ALL OTHER ITEMS HAVE BEEN DELIVERED TO SUMIRIKO|Y
01|252187|1|1|The service includes an oil change and the oil will be|Y
01|252187|1|2|supplied by Suncall America.|Y
01|252192|1|1|Stock @ Factory|Y
01|252192|1|2|next AIR cut is 7/Mid for ETA 7/End~8/Beg.|Y
01|252192|1|3|Quoted at NET price.|Y
01|252193|1|1|CNCZ302TFA-8+1PRJ (Ref. SN 7058)|Y
01|252193|1|2|RTable HiSpeed 300mm AirBrake Fanuc TopMT 8pRJ w/o Mtr|Y
01|252193|1|3|Lead time: 3.5mo mfg + Ship(Boat 1.5mo)|Y
01|252193|1|4|NET Price. SP Order Item. Orders cannot be canceled|Y
01|252193|1|5|after confirmation.|Y
01|252194|1|1|CNCZ302TFA-8+1PRJ (Ref. SN 6812)|Y
01|252194|1|2|RTable HiSpeed 300mm AirBrake Fanuc TopMT 8pRJ w/o Mtr|Y
01|252194|1|3|Lead time: 3.5mo mfg + Ship(Boat 1.5mo)|Y
01|252194|1|4|NET Price. SP Order Item. Orders cannot be canceled|Y
01|252194|1|5|after confirmation.|Y
01|252196|1|1|Discount applies to 20pcs.|Y
01|252200|1|1|#71 NH501R166 Dial Scale|Y
01|252200|2|1|#72 NH501R168 Scale Plate|Y
01|252200|3|1|#75 NH501R155 T-Slot Cover|Y
01|252200|4|1|#110 NH501R158 Round Nut|Y
01|252200|5|1|#112 Bevel Gear|Y
01|252200|6|1|#113 Gear Shaft|Y
01|252200|7|1|#114 Distance Collar|Y
01|252200|8|1|#116 NH501R161 Stopper Bolt|Y
01|252200|9|1|#122 Winding Blade|Y
01|252209|1|1|HSK40A-SF0500-2.00|Y
01|252209|2|1|HSK40A-SF0500-3.54|Y
01|252228|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|252236|17|1|Replacement for C4006-0312-1.38 which is discontinued.|Y
01|252257|2|1|ROTARY JOINT ON BACK ORDER. THIS ITEM IS NOT|Y
01|252257|2|2|REQUIRED UNLESS HYDRAULIC OR PNEUMATIC WORKHOLDING|Y
01|252257|2|3|IS GOING TO BE USED.|Y
01|252257|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|252257|4|1|INSTALLATION OF 5AX-201 ON MORI DURAVERTICAL 5100|Y
01|252257|4|2|WITH EXISTING 5AX-120 ROTARY ON IT. THIS COVERS|Y
01|252257|4|3|TRAVEL EXPENSES FOR L-N SERVICE TECHNICIAN AS WELL|Y
01|252257|4|4|AS ALL HARDWARE REQUIRED FOR THE INSTALLATION|Y
01|252257|5|1|INSTALLATION FOR 5AX-201 ON MORI SEIKI DURAVERTICAL|Y
01|252257|5|2|5100 VMC THAT ALREADY HAD EXISTING 5AX-120 INSTALLED|Y
01|252269|1|1|No INS Required.|Y
01|252269|2|1|No INS Required.|Y
01|252269|3|1|No INS Required.|Y
01|252283|1|1|This package includes travel time (16 hours)|Y
01|252283|1|2|two day of labor report preparation and|Y
01|252283|1|3|related expenses. For the 25 tables currently at AAC|Y
01|252287|1|1|**NET PRICE**|Y
01|252287|2|1|**NET PRICE**|Y
01|252287|6|1|**NET PRICE**|Y
01|252287|7|1|**NET PRICE**|Y
01|252295|1|1|Match with SN#5062|Y
01|252295|1|2|Pricing shows as Net price|Y
01|252295|1|3|Manufacturing approx.4 - 4.5 months plus|Y
01|252295|1|4|Shipping approx.1.5 months|Y
01|252302|3|1|This item is special non-standard stock.  Once a|Y
01|252302|3|2|Purchase Order has been received this item cannot be|Y
01|252302|3|3|cancelled or returned.|Y
01|252302|4|1|This item is special non-standard stock.  Once a|Y
01|252302|4|2|Purchase Order has been received this item cannot be|Y
01|252302|4|3|cancelled or returned.|Y
01|252304|1|1|Estimated delivery is 5~6 weeks after receipt of a|Y
01|252304|1|2|Purchase Order if order is placed after 7/14/2026.|Y
01|252308|1|1|5AX-130WAR21|Y
01|252308|1|2|Tilt Table FacePlate130mmAirBrakeAR21Controllers(x2)|Y
01|252308|2|1|On-Site Installation Service (Travel/2 Day Labor/Exp)|Y
01|252308|2|2|Richmond Auto Parts Technology Inc|Y
01|252308|2|3|5000 Corporate Way Richmond KY 40475|Y
01|252319|1|1|Repair/Rebuild Brake CNCZ180 SN 25266T|Y
01|252319|1|2|25265T XXXXXX XXXXXX|Y
01|252342|1|1|We currently have six (6) remaining in stock that uses|Y
01|252342|1|2|the 040-SPAN wrench.  Once stock is depleted you will|Y
01|252342|1|3|need to order NC5007-0040-12.00G that has a smooth|Y
01|252342|1|4|nut that uses the TQW-150 torque wrench plus the|Y
01|252342|1|5|TQW-E40-G torque wrench attachment.|Y
01|252348|4|1|NET price|Y
01|252366|3|1|Includes air freight|Y
01|252367|2|1|Early September lead time|Y
01|252384|1|1|RGA#LVR-63045/|Y
01|252384|1|2|Repair of MNL12-ER32Z-ICE-10K SN:9890103 (Mim#101523)|Y
01|252384|2|1|Bearings seals o-rings 2 coolant sealing threadrings|Y
01|252384|2|2|to be replaced.|Y
01|252403|1|1|Special non-standard stock: cannot be cancelled or|Y
01|252403|1|2|returned upon receipt of PO|Y
01|252405|1|1|9 currently in stock 20 coming in 5 weeks and 1 is|Y
01|252405|1|2|TBD.|Y
01|252405|3|1|8 currently in stock and looking at 1 week on remaining|Y
01|252405|3|2|pieces.|Y
01|252406|1|1|RGA#LVR-63045/|Y
01|252406|1|2|Repair of MNL12-ER32Z-ICE-10K SN:8918810 (Mim#101523)|Y
01|252406|2|1|Bearings seals o-rings 2 coolant sealing threadrings|Y
01|252406|2|2|and ER 32 Spindle to be replaced.|Y
01|252409|9|1|ADAPTER PLATE FOR P96Z CONSOLE TO FIT 5AX-201|Y
01|252409|10|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|252409|11|1|INCLUDES TRAVEL AND ALL NECESSARY HARDWARE FOR|Y
01|252409|11|2|LYNDEX-NIKKEN TO INSTALL 5AX-201 ON MORI DV5100|Y
01|252410|1|1|Net price includes the following parts for assembly|Y
01|252410|1|2|at Lyndex-Nikken: HSK63-TubeSKN-6WKJ(GH) SKG6-6HG-J|Y
01|252410|1|3|customer's supplied RFID chip and holder re-balanced.|Y
01|252410|2|1|Net price includes the following parts for assembly|Y
01|252410|2|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|252410|2|3|customer's supplied RFID chip and holder re-balanced.|Y
01|252410|3|1|Net price includes the following parts for assembly|Y
01|252410|3|2|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|252410|3|3|and customers RFID chips. Holders to be re-balanced.|Y
01|252410|4|1|Net price include the following parts for assembly|Y
01|252410|4|2|at Lyndex-Nikken: HSK63-Tube and customer's supplied|Y
01|252410|4|3|RFID chip and holder re-balanced.|Y
01|252435|4|1|OVERSTOCK PROMOTION|Y
01|252447|2|1|*AUTOMATIC GAIN SETTING - NO PARAMETERS!|Y
01|252447|2|2|*180 DEG. ROTATING HEAT COIL FOR LONG TOOL LENGTHS|Y
01|252447|2|3|380-480vac; 14KW Output; Twin Cooling Towers|Y
01|252447|2|4|*Onboard Storage; Accessory Kit included|Y
01|252462|1|1|**Cannot be cancelled or returned upon receipt of a PO|Y
01|252468|1|1|Lead time 8-9 weeks|Y
01|252472|1|1|Currently looking at 8-9 weeks.|Y
01|252475|1|1|RGA#LVR-63054/|Y
01|252475|1|2|Repair of MZQT47-ER32X-OFF-ICE SN:1990780702|Y
01|252475|1|3|(Mim#124259)|Y
01|252475|2|1|Bearings seals o-rings and ER 32 Threadring to be|Y
01|252475|2|2|replaced|Y
01|252486|1|1|Considered custom tool for specific applications -|Y
01|252486|1|2|cannot be cancelled or returned after receipt of PO|Y
01|252486|2|1|LN to make block 1 week after receipt of spidle specs|Y
01|252486|2|2|necessary for design|Y
01|252486|2|3|Cannot be cancelled or returned after receipt of a PO|Y
01|252498|1|1|Mid-September Delivery|Y
01|252501|2|1|Please note additional 20% applied per overstock promo.|Y
01|252501|2|2|Once PO/order issued these cannot be cancelled or|Y
01|252501|2|3|returned.|Y
01|252506|1|1|SN:5023 EU:Turbocam Inc|Y
01|252506|1|2|RGA#TAR-62996 5AX-201YA|Y
01|252512|1|1|MSC SKU: 13121223|Y
01|252512|1|2|SN: 2J7167|Y
01|252512|2|1|MSC SKU: 44937977|Y
01|252512|2|2|Included with SF Unit|Y
01|252512|3|1|MSC SKU: 39353966|Y
01|252512|4|1|MSC SKU: 39353982|Y
01|252512|5|1|MSC SKU: 39351648|Y
01|252514|1|1|For Mr.Miyahara(NIKKEN Germany)/OMV(Italy)PRJ|N
01|252523|1|1|NOTE: FOR OKUMA GENOS M660|Y
01|252523|1|2|CUSTOM TRUNNION PACKAGE FOR 800# MAX PLATE|Y
01|252523|8|1|MT TRUNNION STALLION 9-35 -3 DROP -CUSTOM|Y
01|252523|8|2|BP-1664-UPM660 -1.25 BASEPLATE|Y
01|252523|8|3|R3-CNC321 - RISER BLOCK CNC321|Y
01|252523|8|4|R5-TAT250 - RISER BLOCK TAT-250|Y
01|252564|1|1|RGA#CUR-63080/|Y
01|252564|1|2|Repair of 3x C50-MRAM SN:1990793805 2390546703 and|Y
01|252564|1|3|2390546704 (Mim#162732)|Y
01|252564|2|1|All bearings seals and o-rings to be replaced|Y
01|252575|1|1|RGA#LVR-63085/|Y
01|252575|1|2|Repair of 2x NK103-12000 SN:AC1313AC-0665 and|Y
01|252575|1|3|AC1313AC-0693 (Alps#NK103-12000)|Y
01|252575|2|1|Drive shaft Gear Bearings O-Rings Collet Nut and|Y
01|252575|2|2|small parts requiring replacement.|Y
01|252576|1|1|100pc minimum|Y
01|252583|1|1|300 MM Zero Point Base with 3 Zero Point Pods|Y
01|252583|1|2|quote is contingent of the machine tool builder|Y
01|252583|1|3|being able to run air to the Rotary Union|Y
01|252583|1|4|Material: Aluminum|Y
01|252583|1|5|ZC45768 Base P.CD 150/3|Y
01|252583|2|1|ZC Cover Sheet|Y
01|252585|1|1|E68B Presetter Spindle Mounting Brackets/Spindle|Y
01|252585|1|2|Shelves|Y
01|252599|1|1|APPLICATION NOTES: UNREPAIRABLE TABLE REPLACEMENT|Y
01|252599|1|2|FIELD INSTALLATION REQUIRED BY OTHERS|Y
01|252599|1|3|BUILT TO MATCH SUPPLIED TABLE SPECS|Y
01|252599|1|4|NO CORE CREDIT NO REASSEMBLY OF EXISTING TABLE|Y
01|252599|2|1|REPLACEMENT FOR EXISTING UN-REPAIRABLE 5AX-201|Y
01|252599|2|2|5AX-201BASA-BR2/S1000X1 (R650 CONVERSION)|Y
01|252599|2|3|RN-AX201SD-4+N-A ROTARY JOINT RQR'D|Y
01|252599|2|4|INCLUDES TABLE CABLES TO HARTING CONNECTOR -2 AXIS|Y
01|252599|2|5|REUSE MACHINE INTERFACE CABLES.|Y
01|252599|3|1|List = $55620|Y
01|252599|7|1|We will waive the evaluation fee for your current table|Y
01|252599|7|2|repair with the purchase of this replacement table.|Y
01|252599|7|3|The evaluation fee only applies should you choose|Y
01|252599|7|4|not to proceed with repair. Basic Aluminum is|Y
01|252599|7|5|responsible for shipping cost to and from|Y
01|252599|7|6|Lyndex-Nikken.|Y
01|252606|1|1|SIGMA 5 MOTORS ARE INCLUDED|Y
01|252606|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|252606|3|1|INCLUDES INSTALLATION FOR TWO 5AX-201 TABLES|Y
01|252636|1|1|Final Part# MZMP47-ER25X-MD **NET PRICE**|Y
01|252636|1|2|Mazak VDI40 Live ER25 X<Radial>STRT ExtCool MainDual|Y
01|252636|2|1|Final Part# MZMP47-ER25X-MD **NET PRICE**|Y
01|252636|2|2|Mazak VDI40 Live ER25 X<Radial>STRT ExtCool MainDual|Y
01|252636|5|1|Final Part# MZMP47-ER25Z-MD **NET PRICE**|Y
01|252636|5|2|Mazak VDI40 Live ER25 Z<Axial>90D ExtCool MainDual|Y
01|252636|6|1|Final Part# MZMP47-ER25Z-MD **NET PRICE**|Y
01|252636|6|2|Mazak VDI40 Live ER25 Z<Axial>90D ExtCool MainDual|Y
01|252636|11|1|Mimatic part# A196190 **NET PRICE**|Y
01|252636|12|1|Mimatic part# A196190 **NET PRICE**|Y
01|252655|5|1|BMT65 ER32 X-AXIS OFFSET TOOL W/ 1:2 GEAR RATIO|Y
01|252655|5|2|MAXIMUM RPM 11500|Y
01|252655|5|3|4 WEEKS APPROVAL DRAWING 12 WEEKS MANUFACTURING &|Y
01|252655|5|4|2 WEEKS FOR SHIPPING|Y
01|252655|5|5|TOTAL DELIVERY FOR THESE TOOLS IS 18 WEEKS|Y
01|252662|1|1|CNCZ260LFA-6RJ  (SN: 7033)|Y
01|252662|1|2|Rotary Table HiSpeed 260mm AirBrake Fanuc LeftMT|Y
01|252662|1|3|without R/Joint. SP Order Item. Orders cannot be|Y
01|252662|1|4|canceled once accepted.|Y
01|252662|1|5|Lead Time: 5.0mo (3.5 mo MFG + Shipping 1.5mo)|Y
01|252662|2|1|6p built-in RJ (Water Glycol)|Y
01|252663|1|1|FOR HAAS VS-1|Y
01|252663|1|2|GEROTECH TO SUPPLY YASNAC MOTOR - SPEC TBD|Y
01|252664|1|1|ZC ZP138 1250mm X 1250mm BASE PLATE WITH 8 WH-ZP138-SX|Y
01|252664|1|2|DELIVERY: ~12 Weeks after approval drawing is signed|Y
01|252664|1|3|by the customer|Y
01|252664|1|4|**NET PRICE** Special- noncancellable/nonreturnable|Y
01|252664|5|1|COVER PLATE FOR 1250mmX1250mm BASE PLATE WITH 8X ZP138s|Y
01|252670|1|1|ALHQ2606-0323 0002|Y
01|252678|1|1|Estimated delivery is end of July.|Y
01|252698|1|1|OK60 OD single holder - C4.DVR/L.OK60A|Y
01|252698|3|1|OK60 OD single holder - C4.DVR/L.OK60A.SP|Y
01|252698|5|1|OK60 OD double holder - C4.DVR/L.OK60A.D|Y
01|252698|7|1|OK60 OD Y holder - C4.DVR/L.OK60A.Y|Y
01|252698|9|1|OK60 OD 15 degree Y holder - C4.DVR/L.OK60A.Y-15|Y
01|252698|11|1|OK60 OD double Y holder - C4.DVR/L.OK60A.DY|Y
01|252698|13|1|OK60 ID single holder - C4.DUR/L.OK60A|Y
01|252698|15|1|OK60 ID single holder - C4.DUR/L.OK60A.SS|Y
01|252698|17|1|OK60 ID double holder - C4.DUR/L.OK60A.D|Y
01|252698|19|1|OK60 ID Y holder - C4.DUR/L.OK60A.Y|Y
01|252698|21|1|OK60 ID 15 degree Y holder - C4.DUR/L.OK60A.Y-15|Y
01|252698|23|1|OK60 ID X holder - C4.DUR/L.OK60A.X|Y
01|252698|25|1|OK60 ID double X holder - C4.DUR/L.OK60A.DX|Y
01|252698|27|1|OK60 ID double Y holder - C4.DUR/L.OK60A.DY|Y
01|252710|1|1|FOR HAAS VF2SSYT SN:1087595 RETROFIT|Y
01|252710|1|2|SW: 18.28 CONFIRMED CHC CONTROL|Y
01|252710|1|3|HFO TO PROVIDE INSTALLATION LABOR AND SERVO DRIVES|Y
01|252711|1|1|This table casting only no cable or motor are included|Y
01|252711|1|2|cover does not match the original table.|Y
01|252714|1|1|Part number TBD:  16C Round Collet 0.415|Y
01|252714|1|2|Internal and External Threads.|Y
01|252714|1|3|Minimum order quantity 2-pcs|Y
01|252714|1|4|Quoted at NET price.|Y
01|252714|2|1|Part number TBD: 16C Round Collet 0.292|Y
01|252714|2|2|Internal and External Threads.|Y
01|252714|2|3|Minimum order quantity 2-pcs|Y
01|252714|2|4|Quoted at NET price each.|Y
01|252720|1|1|MCM5-1.1/4-U5/8|Y
01|252720|1|2|Nikken Morse Taper (MT5) Milling Chuck - Draw Thread|Y
01|252720|1|3|Style.  QUOTED AT NET PRICING.|Y
01|252724|2|1|ZeroClamp SP Clamping Base for Variaxis i800 Mazak|Y
01|252724|2|2|Base size 500mm x 500mm Pod ZP 120 x 5pcs.|Y
01|252724|2|3|SP Order Item. NET Price Each. Cancellations cannot be|Y
01|252724|2|4|accepted once the order has been received.|Y
01|252724|2|5|Delivery: 3mo Mfg + Shipping(Boat 1.5-2.0mo)|Y
01|252724|2|6|Air freight is also available as an option. Please NOTE|Y
01|252724|2|7|that an additional Air freight cost will be applied.|Y
01|252728|1|1|T32408 Mori Seiki Tool|Y
01|252728|1|2|For ZT1000 Machine|Y
01|252730|1|1|Zero Point Base with 3 Zero Point Pods|Y
01|252730|1|2|quote is contingent of the machine tool builder|Y
01|252730|1|3|being able to run air to the Rotary Union|Y
01|252730|1|4|*Delivery is 14-16 weeks MFG + Shipping|Y
01|252730|1|5|Material: Steel|Y
01|252730|2|1|Freight charges from Mfg to Lyndex Nikken only|Y
01|252730|2|2|Does not include shipping cost to True Precision|Y
01|252733|1|1|FOR NOMURA DST-40L MITS M80 SERIES CONTROL|Y
01|252733|1|2|DATA SHEETS AND E-PLAN REQUIRED AT TIME OF ORDER|Y
01|252733|1|3|GOSIGER TO INSTALL|Y
01|252733|1|4|LEAD TIME 4-6W ARO.|Y
01|252733|1|5|L-N TO PROVIDE INTERFACE CABLES EXTERNAL CABLES|Y
01|252733|1|6|DRIVES BASE PARAMETER FILE AND BASIC HARDWARE KIT.|Y
01|252733|2|1|5AX-2MT-105-120MA-M FOR NOMURA DST40L|Y
01|252733|2|2|CONVERT ...-120FA OR -120YA|N
01|252739|1|1|Cables included|Y
01|252739|2|1|Cables included|Y
01|252740|3|1|Please note installation and training has not been|Y
01|252740|3|2|included yet and is to be determined.|Y
01|252745|1|1|No Inspection Required.|Y
01|252745|2|1|No Inspection Required.|Y
01|252745|3|1|No Inspection Required.|Y
01|252745|4|1|No Inspection Required.|Y
01|252745|5|1|No Inspection Required.|Y
01|252745|6|1|No Inspection Required.|Y
01|252745|7|1|No Inspection Required.|Y
01|252751|1|1|SPECIAL: 10 PCS OR MORE.|Y
01|252751|1|2|H63A-SF0187-3.15MT; MOLD TYPE SHANK SHRINK FIT 3/16|Y
01|252751|1|3|3.15 GAGE LENGTH|Y
01|252751|1|4|LANDED COST = 130/EA @10 OR MORE|N
01|252751|2|1|SPECIAL 10 PCS OR MORE.|Y
01|252751|2|2|H63A-SF0187-6.30MT; MOLT TYPE SHRINK FIT 3/16|Y
01|252751|2|3|6.3 GAGE LENGTH|Y
01|252751|2|4|LANDED COST = 167.00/EA @ 10 OR MORE|N
01|252759|1|1|Mimatic #193823 - 2 pcs of ICE version ER32 offset|Y
01|252759|1|2|type 1:2 ratio 11500 max RPM.|Y
01|252759|3|1|Mimatic #195807 - 2 pcs of external coolant version|Y
01|252759|3|2|ER32 offset type 1:2 ratio 11500 max RPM.|Y
01|252771|1|1|Gerotech to supply the motor and cable.|Y
01|252778|1|1|We currently have five (5) pieces in Illinois.  The|Y
01|252778|1|2|estimated delivery for the balances of nine (9) pieces|Y
01|252778|1|3|is approximately 12~14 weeks after receipt of an order.|Y
01|252786|1|1|C5001-0750-4.00CP-DIN-M|Y
01|252786|1|2|CAT50 Shell Mill Holder 3/4 CoolantPorts ChipHole DIN_|Y
01|252786|2|1|C5001-0750-1.75CP-DIN-M|Y
01|252786|2|2|CAT50 Shell Mill Holder 3/4 CoolantPorts ChipHole DIN_|Y
01|252786|3|1|C5001-1500-6.00CP-DIN-M|Y
01|252786|3|2|CAT50 Shell Mill Holder 1.1/2 Coolant Ports Chip Hole|Y
01|252786|3|3|DIN|Y
01|252786|4|1|Quoted at NET price.|Y
01|252795|1|1|NBT30-TB1.1/4-10.00NF|Y
01|252795|1|2|Dual Contact test bar|Y
01|252796|1|1|MI50-SM27 with 6 GL - MI50 shell mill holder 27mm|Y
01|252796|1|2|6 gage length.|Y
01|252804|3|1|We currently have 3 in stock and balance of 2 would be|Y
01|252804|3|2|6 months from time of order.|Y
01|252819|1|1|Cables included|Y
01|252819|3|1|Cables included.|Y
01|252826|2|1|Additional 20% discount has been applied for our|Y
01|252826|2|2|Overstock Promotion.  Once a Purchase Order has been|Y
01|252826|2|3|received this item cannot be cancelled or returned.|Y
01|252844|1|1|We currently have 14 pieces ready to ship from|N
01|252844|1|2|Illinois with another 3 pieces due in mid-September.|N
01|252844|1|3|The balance of 3 pieces is estimated to be|N
01|252844|1|4|mid-December.|N
01|252858|2|1|POSITIONING BLOCK FOR VF6SS CAT40 VMC|Y
01|252868|1|1|HSK50A-SK10-60|Y
01|252868|1|2|HSK50A Slim Chuck SK10|Y
01|252888|1|1|core exchange to rebuilt motor|Y
01|252894|1|1|Please note these are considered special and have been|Y
01|252894|1|2|quoted at special net price. Lyndex-Nikken will install|Y
01|252894|1|3|RFID chips that are provided by customer and will|Y
01|252894|1|4|rebalance holders.|Y
01|252902|1|1|We currently have stock at the factory.  Estimated|Y
01|252902|1|2|lead time is 2~3 weeks after receipt of an order.|Y
01|252909|1|1|C4001-0500-1.75|Y
01|252909|1|2|with DIN (coolant thru the flange)|Y
01|252910|1|1|Factory Stock under HSK63A-FMC22-60#|N
01|252922|1|1|SN: 101082|Y
01|252927|1|1|SN:6294 EU:XXX|Y
01|252927|1|2|RGA#TAR-63104 CNC501 TFA-10P+1P|Y
01|252932|1|1|FOR MAKINO PS105 W/ FANUC Oi-MF+ ALPHA I HV MOTORS|Y
01|252932|1|2|RIGHT SIDE MOUNT WITH TAT SUPPORT - AIR BRAKE|Y
01|252932|1|3|FOR FUTURE TRUNNION FIXTURE.|Y
01|252932|1|4|FANUC DATA SHEETS AND E-PLAN REQUIRED AT TIME OF ORDER|Y
01|252932|2|1|FANUC a12HV MOTOR|Y
01|252936|1|1|FOR DNS BVM5700 W/ FANUC Oi-MF+ BETA DRIVES|Y
01|252936|1|2|RH MOUNT WITH TAIL STOCK.|Y
01|252936|1|3|DATA SHEETS AND E-PLAN REQUIRED AT THE TIME OF ORDER.|Y
01|252945|2|1|Currently 8 left...upon stock depletion these will need|Y
01|252945|2|2|to be requoted for price and availability. Once PO or|Y
01|252945|2|3|order is issued these cannot be cancelled or returned.|Y
01|252984|2|1|Please note additional 20% applied per overstock promo.|Y
01|252984|2|2|Once PO/order issued these cannot be cancelled or|Y
01|252984|2|3|returned.|Y
01|253009|2|1|4th axis software option is not included.|Y
01|253009|2|2|Includes drive unitshort bar fiber optic cable|Y
01|253009|2|3|communications cable bulkhead cables external cables.|Y
01|253013|1|1|C4.DVR.OK60A.SP|Y
01|253013|1|2|EQUIVALENT TO VELOCITY 14.910.0.0239.0|Y
01|253013|2|1|C4.DUR.OK60A.SS|Y
01|253013|2|2|EQUIVALENT TO VELOCITY 14.910.0.0237.0|Y
01|253016|1|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|253016|2|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|253016|3|1|Req.INS/Install E40-NUT & ER40-SCREW(C)|Y
01|253016|4|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|253020|1|1|CONFIRMED WITH HONDA 07-08-2026 - JAY DOUTE|Y
01|253020|1|2|CORRECTION FOR 250913|Y
01|253021|1|1|DUPLICATED QUOTE FOR 250913. SEGRAGATED PER|Y
01|253021|1|2|JAY DOUTE; 070826.|Y
01|253021|3|1|CNC400HFA-6+2|Y
01|253021|3|2|Rotary Table 400mm HydBrake Fanuc Horizontal w/o Motor|Y
01|253021|3|3|W/6+2 port rotary joint - TCA-59018_2|Y
01|253022|1|1|SPECIAL - Cannot be cancelled or returned|Y
01|253028|2|1|BUDGETARY QUOTE ONLY|Y
01|253028|2|2|WHEN TIME TO ISSUE PO WE WILL QUOTE TABLE THRU AN|Y
01|253028|2|3|AUTHORIZED DISTRIBUTOR.  CABLES AMPLIFIERS ACCESSORY|Y
01|253028|2|4|OR INSTALL AVAILABLE AT ADDITIONAL CHARGE.|Y
01|253033|1|1|SN:1007C EU:Meredith Machinery|Y
01|253033|1|2|RGA#TAR-63141 NCTZ200FA-M|Y
01|253037|5|1|Part Number TBD >> Similar to MZMP5-ER32Z-ICE|Y
01|253037|5|2|Mazak VDI50 Live ER32 Z<Axial>90D IntExtCoolant7MP 13K|Y
01|253037|5|3|CH85mm 1:2 Ratio 13K RPM ICE|Y
01|253044|1|1|RGA#CUR-62908/|Y
01|253044|1|2|Repair of C40RAM-ER32-180-65TP SN:51119 02 (Mim#178108)|Y
01|253044|2|1|Bearings seals and o-rings to be replaced|Y
01|253053|1|1|Please note part number is to be determined still for|Y
01|253053|1|2|HSK100A-C32-200 with added chip install. These are|Y
01|253053|1|3|considered special and have been quoted at special net|Y
01|253053|1|4|price.|Y
01|253064|5|1|LIST price includes cost of balancing with customer|Y
01|253064|5|2|supplied set screws for 3 pcs.|Y
01|253064|5|3|**Non cancellable non-returnable**|Y
01|253069|1|1|SN:5951 EU:XXX|Y
01|253069|1|2|RGA#TAR-663142 TAT105N|Y
01|253072|1|1|Discontinued - non-cancellable/non-returnable|Y
01|253072|2|1|Discontinued - non-cancellable/non-returnable|Y
01|253072|3|1|Discontinued - non-cancellable/non-returnable|Y
01|253072|4|1|Discontinued - non-cancellable/non-returnable|Y
01|253080|5|1|CCK25-1/2|Y
01|253080|6|1|CCK25-5/8|Y
01|253089|1|1|Non-cancellable non-returnable item|Y
01|253096|2|1|Please Note: This manual tailstock will adjust down|Y
01|253096|2|2|to 160 and should work.|Y
01|253099|1|1|FOR DVM4100 W/ FANUC OI-MF+ BETA AMP|Y
01|253099|1|2|MOUNT ORIENTATION TBD|Y
01|253101|1|1|Please note part number is to be determined still for|Y
01|253101|1|2|HSK100A-C32-200 with added chip install. These are|Y
01|253101|1|3|considered special and have been quoted at special net|Y
01|253101|1|4|price.|Y
01|253102|8|1|2pcs stock|Y
01|253102|8|2|Balance of 1pc estimated 1 week|Y
01|253103|1|1|RFID Chip Holes Installed In House|Y
01|253105|2|1|Please note additional 20% applied per overstock promo.|Y
01|253105|2|2|Once PO/order issued these cannot be cancelled or|Y
01|253105|2|3|returned.|Y
01|253111|2|1|Please note additional 20% applied per overstock promo.|Y
01|253111|2|2|Once PO/order issued these cannot be cancelled or|Y
01|253111|2|3|returned.|Y
01|253123|1|1|Pull Force Meter Set / Adapter C5|Y
01|253123|1|2|PFM-SET-C5|Y
01|253133|1|1|BT50-to C6 Adapter / Screw Connection GL=50mm|Y
01|253133|1|2|Minimum order quantity 5-pcs|Y
01|253133|1|3|Quoted at Net price each.|Y
01|253133|2|1|BT50-to C6 Adapter / Screw Connection GL=50mm|Y
01|253133|2|2|Quoted 6 to 10 pieces.|Y
01|253133|2|3|Quoted at Net price each.|Y
01|253145|1|1|No Inspection Required|Y
01|253145|2|1|No Inspection Required|Y
01|253145|3|1|No Inspection Required|Y
01|253150|1|1|SN:6294 EU:XXX|Y
01|253150|1|2|RGA#TAR-63104 CNC501 TFA-10P+1P|Y
01|253151|1|1|SN#6294. CNC501TFA-10+1PRJ.|Y
01|253151|1|2|OKK HPM40 Machine# 157.|Y
01|253151|1|3|Total Net price of overhaul for the captioned RT|Y
01|253151|1|4|RGA#TAR-63104|Y
01|253151|1|5|Hrizon Service America|Y
01|253151|1|6|Honda GA Plant|Y
01|253181|1|1|RGA#LVR-63146/|Y
01|253181|1|2|Repair of MZMP47-ER32Z SN:6649603 (Mim#124619)|Y
01|253181|2|1|Bearings seals o-rings gears output spindle and|Y
01|253181|2|2|input spindle to be replaced.|Y
01|253192|1|1|This stand is a showroom model and may have a few scuff|Y
01|253192|1|2|marks please see photos attached in email|Y
01|253192|2|1|Special price if PO is received before 7-31-26|Y
01|253198|1|1|BMT75 Live ER40 X<Radial>STRT ICE|Y
01|253198|1|2|Internal/External Coolant and can be run dry.|Y
01|253198|1|3|Quoted at NET price.|Y
01|253198|1|4|DWG#196200 (LN# will be is BMT75-ER40X-OFF-ICE) is for|Y
01|253198|1|5|reference only and approval drawing will be issued|Y
01|253198|1|6|after customer places order. Please allow 4 weeks for|Y
01|253198|1|7|the approval drawing. Delivery of holder is 16~17 wks|Y
01|253198|1|8|after receipt of signed drawing.|Y
01|253198|3|1|BMT75 with C5X Output ICE|Y
01|253198|3|2|Internal/External Coolant and can be run dry.|Y
01|253198|3|3|Quoted at NET price.|Y
01|253198|3|4|Approval drawing 197605 (LN# will be BMT75-C5X-ICE)|Y
01|253198|3|5|If your customer decides to place order please have|Y
01|253198|3|6|them sign off on the drawing and return with purchase|Y
01|253198|3|7|order.|Y
01|253205|1|1|INCQ2607-0452 0025|Y
01|253206|2|1|SPECIAL - Non-cancellable/non-returnable|Y
01|253224|1|1|Hydro-Flex 113056|Y
01|253239|5|1|HSK40E-R0875-3.31 - HSK40E Rigid Tap Holder #2|Y
01|253239|5|2|Please allow 7 weeks manufacturing after signed|Y
01|253239|5|3|approval drawing received. These are non-standard stock|Y
01|253239|5|4|and have been quoted at special net price. Once PO or|Y
01|253239|5|5|order issued these cannot be cancelled or returned.|Y
01|253249|1|1|**NET PRICE** Special - cannot be cancelled or returned|Y
01|253249|1|2|DELIVERY: 12-13 weeks for mfg/shipping after approval|Y
01|253249|1|3|drawing is signed|Y
01|253253|10|1|Misc hoses and fittings included|Y
01|253256|1|1|Please Note: This holder is non standard stock. Once|Y
01|253256|1|2|a purchase order is palced it cannot be cancelled or|Y
01|253256|1|3|returned.|Y
01|253264|1|1|Discount reflects a order of 1~15 holders.|Y
01|253264|2|1|Discount reflects a order of 16~30 holders.|Y
01|253264|10|1|Discount reflects a order of 1~15 knobs.|Y
01|253264|11|1|Discount reflects a order of 16~30 knobs.|Y
01|253267|8|1|2pcs stock|Y
01|253267|8|2|Balance of 1pc estimated 1 week|Y
01|253275|3|1|Additional 20% discount applied for our Overstock|Y
01|253275|3|2|Promotion.  Once a Purchase Order is received this|Y
01|253275|3|3|item cannot be cancelled or returned.|Y
01|253285|1|1|DEMO UNIT RESALE. FULL KIT IN ORIGINAL CRATE. VGC|Y
01|253285|1|2|ADDITIONAL DISCOUNT FOR TRADE-IN OF EXISTING START 2|Y
01|253285|1|3|HAS BEEN APPLIED. ($2000 VALUE)|Y
01|253285|2|1|SERIAL NUMBER 2J7079|Y
01|253285|2|2|ADJUST COST AT ORDER ENTRY|N
01|253285|2|3|AJ251205     12-05-2025     3552.09 (LANDED COST)|N
01|253285|2|4|APPROVED - DANAS|N
01|253285|2|5|FOB- CLEVELAND OHIO|N
01|253286|1|1|SN:17229 EU:Mirai Casting America Inc.|Y
01|253286|1|2|RGA#TAR-63100 CNC321LOSP4-M|Y
01|253287|3|1|Please note this is considered special and non-standard|Y
01|253287|3|2|stock. Once PO/order issued these cannot be cancelled|Y
01|253287|3|3|or returned.|Y
01|253289|2|1|Additional 20% added to 42% discount. Final Sale|Y
01|253293|1|1|Calibration and Preventative Maintenance on 2x E346+|Y
01|253293|1|2|Presetters SN:101350 & 101440|Y
01|253293|1|3|Service Performed on|N
01|253293|2|1|On-Site Service Call ESTIMATE for Travel/Time/Labor|Y
01|253293|2|2|Travel:X hours/ Labor:X hours|N
01|253298|1|1|Table with HAAS Sigma 5 Motor and Haas cable|Y
01|253300|3|1|Spindle wrench for MNL12-SK20X-ICE-10K-J|Y
01|253300|4|1|Nut wrench for MNL12-SK20X-ICE-10K-J|Y
01|253311|1|1|MSC#79788758|Y
01|253315|2|1|Pneumatic tailstock with confirmation switches and MT2|Y
01|253315|2|2|center socket without center.|Y
01|253315|2|3|Tailstock to be fired via M-code. Solenoid and pressure|Y
01|253315|2|4|switches not included.|Y
01|253315|3|1|collets not included.|Y
01|253315|3|2|Closer requires constant air pressure for clamp and|Y
01|253315|3|3|unclamp.|Y
01|253315|4|1|Adapter plate of chuck|Y
01|253317|1|1|Final Part# MZMP47-BG50MZ-C **NET PRICE**|Y
01|253317|1|2|SPECIAL - non-cancellable / non-returnable|Y
01|253317|1|3|Mazak VDI40 Static BG50mm Z<Axial>90D IntExtCool CH150|Y
01|253317|1|4|Mim# 117985|Y
01|253317|2|1|Final Part# MZMP47-BG50MZ-C **NET PRICE**|Y
01|253317|2|2|SPECIAL - non-cancellable / non-returnable|Y
01|253317|2|3|Mazak VDI40 Static BG50mm Z<Axial>90D IntExtCool CH150|Y
01|253317|2|4|Mim# 117985|Y
01|253329|1|1|HSK63A-SM0500-1.75CP - HSK63A Shell Mill Holder 1/2|Y
01|253329|1|2|w/ 1.75 GL.|Y
01|253366|1|1|2-3 weeks|Y
01|253367|2|1|ADDED DISCOUNT ONLY APPLIES IF COMPLETE 6PC ORDER|Y
01|253367|2|2|NORMAL DISCOUNT OF 20% APPLIES IF LESS THAN 6PC ORDER|Y
01|253369|38|1|Grinding fee for 2x rotary joints|Y
01|253382|1|1|FOR DN SOLUTIONS DNM5700  W/ FANUC OI-MF+ BETA-i|Y
01|253382|1|2|RIGHT SIDE MOUNT WITH SCROLL CHUCK AND MANUAL|Y
01|253382|1|3|TAILSSTOCK|Y
01|253382|5|1|LABOR REMOVED FOR LOCAL INSTALLATION BY ELLISON|Y
01|253382|5|2|add Thank you to order|N
01|253383|1|1|FOR MAKINO F5 W/ FANUC FS310i-A (4+1) Alpha-iHV Motors|Y
01|253383|1|2|400vac drives|Y
01|253383|1|3|Right side mount|Y
01|253384|1|1|FOR MAKINO PS105 FANUC Oi-MF (Pro-P) w/ Fanuc HV|Y
01|253384|1|2|drives and motors.|Y
01|253384|1|3|Right side mount.  Fanuc data sheets required at time|Y
01|253384|1|4|of order.|Y
01|253385|1|1|FOR TSUGAMI VA3 W/ FANUC Oi-MF BETA AMPS.|Y
01|253385|1|2|RIGHT SIDE MOUNT.|Y
01|253385|1|3|FANUC DATA SHEETS AND E-PLAN REQUIRED AT TIME OF ORDER|Y
01|253385|6|1|FOUNDATION PLATE TO ADAPT ROTARY TO VA3 TABLE T-SLOT|Y
01|253389|1|1|FOR OKUMA GENOS M560V. RIGHT SIDE MOUNT.|Y
01|253389|1|2|GOSIGER TO PROVIDE INSTALLATION AND DRIVES|Y
01|253389|2|1|REQUIRED|Y
01|253391|1|1|additional 3% discount added.|Y
01|253399|1|1|Quantity break for 20pcs|Y
01|253399|1|2|Quoted at NET pricing|Y
01|253399|2|1|Quantity break for 30pcs|Y
01|253399|2|2|Quoted at NET pricing|Y
01|253399|3|1|Quoted at NET pricing.|Y
01|253399|3|2|Price is for 40pcs. If quantities should fall under|Y
01|253399|3|3|40pc please submit for requote.|Y
01|253403|7|1|M12x1.75 - 50mm L|Y
01|253403|8|1|16mm T-SLOT NUT. M12x1.75|Y
01|253408|1|1|Final Part#CAT40N-MMC8C-85U-AT **NET PRICE**|Y
01|253408|1|2|NON CANCELLABLE NON RETURNABLE AFER RECEIPT OF PO|Y
01|253408|1|3|Custom Modification of CAT40-MMC8C-85U-AT-IDU|Y
01|253410|1|1|RGA#LVR-63119/|Y
01|253410|1|2|Repair of MZQT47-ER25-AD-ICE SN:2590325801 (Mim#191269)|Y
01|253410|2|1|Output Spindle gears bearings seals and o-rings|Y
01|253410|2|2|to be replaced|Y
01|253412|1|1|Special one time price for showroom unit.|Y
01|253425|1|1|SN:1452C EU:Ferrous Engineering & Tool|Y
01|253425|1|2|RGA#TAR-63035 NCT200EYA-M|Y
01|253426|1|1|No Inspection Required|Y
01|253426|2|1|No Inspection Required|Y
01|253426|3|1|No Inspection Required|Y
01|253426|4|1|No Inspection Required|Y
01|253428|1|1|**non-cancellable non-returnable**|Y
01|253431|1|1|SN:1460C EU:Ferrous Engineering & Tool|Y
01|253431|1|2|RGA#TAR-63036 NCT200EYA-M|Y
01|253442|1|1|SN:1462C EU:Ferrous Engineering & Tool|Y
01|253442|1|2|RGA#TAR-63037 NCT200EYA-M|Y
01|253449|1|1|TC# 5198|Y
01|253449|1|2|Tool holders for new Roku|Y
01|253459|4|1|HSK100A-SK25C-200#|Y
01|253459|4|2|HSK100A Slim Chuck SK25 Coolant 15K|Y
01|253459|4|3|This tool is non standard stock. Once a purchase order|Y
01|253459|4|4|is placed it cannot be cancelled or returned.|Y
01|253459|5|1|HSK100A-SK25C-250#|Y
01|253459|5|2|HSK100A Slim Chuck SK25 Coolant 15K|Y
01|253459|5|3|This tool is non standard stock. Once a purchase order|Y
01|253459|5|4|is placed it cannot be cancelled or returned.|Y
01|253459|12|1|HSK100A-ER40S-10.00|Y
01|253459|12|2|HSK100A ER40 Collet Chuck SolidNut ChipHole 25K|Y
01|253459|12|3|Quoted at NET Price. Please note: Delivery is 22 weeks|Y
01|253459|12|4|after receipt of signed approval drawing. Approval|Y
01|253459|12|5|drawing to be sent after receipt of purchase order.|Y
01|253459|12|6|This holder is special once a purchase order is|Y
01|253459|12|7|placed it cannot be cancelled or returned.|Y
01|253459|13|1|HSK100A-ER40S-8.00|Y
01|253459|13|2|HSK100A ER40 Collet Chuck SolidNut ChipHole 25K|Y
01|253459|13|3|Quoted at NET Price. Please note: Delivery is 22 weeks|Y
01|253459|13|4|after receipt of signed approval drawing. Approval|Y
01|253459|13|5|drawing to be sent after receipt of purchase order.|Y
01|253459|13|6|This holder is special once a purchase order is|Y
01|253459|13|7|placed it cannot be cancelled or returned.|Y
01|253461|1|1|RGA#LVR-63155/|Y
01|253461|1|2|Repair of MZMP46-ER32Z-ICE SN:21905104 03 (Mim#124854)|Y
01|253461|2|1|Bearings seals o-rings output spindle to be replaced|Y
01|253461|4|1|RGA#LVR-63155/|Y
01|253461|4|2|Repair of MZMP46-ER32Z-ICE SN:21905104 04 (Mim#124854)|Y
01|253461|5|1|Bearings seals o-rings output spindle to be replaced|Y
01|253461|7|1|RGA#LVR-63155/|Y
01|253461|7|2|Repair of MZMP46-ER32Z SN:18900906 02 (Mim#124610)|Y
01|253461|8|1|Bearings seals o-rings main housing output spindle|Y
01|253461|8|2|to be replaced|Y
01|253475|1|1|B5011-1000-4.00CP - BT50 shell mill holder 1 4 GL|Y
01|253475|1|2|with coolant ports.|Y
01|253481|2|1|**Non-cancellable non-returnable**|Y
01|253483|1|1|FOR GENOS M660V W/ OSP4.  GOSIGER INSTALL.|Y
01|253483|1|2|RIGHT SIDE MOUNT.|Y
01|253487|1|1|Discount reflects purchase order of 1~2 tools.|Y
01|253487|2|1|Discount reflects purchase order of 3~5 tools.|Y
01|253497|1|1|HSK63A(80)SK10-80U-IDU|Y
01|253497|1|2|HSK63A/80 SK10 80mm gauge length w/ID chip hole|Y
01|253497|1|3|Quoted at NET pricing|Y
01|253497|2|1|HSK63A(80)SK10-120U-IDU|Y
01|253497|2|2|HSK63A/80 SK10 120mm gauge length w/ID chip hole|Y
01|253497|2|3|Quoted at NET pricing|Y
01|253497|3|1|HSK63A(80)SK10-180U-IDU|Y
01|253497|3|2|HSK63A/80 SK10 180mm gauge length w/ID chip hole|Y
01|253497|3|3|Quoted at NET pricing|Y
01|253497|4|1|HSK63A(80)SK16-80U-IDU|Y
01|253497|4|2|HSK63A/80 SK16 80mm gauge length w/ID chip hole|Y
01|253497|4|3|Quoted at NET pricing|Y
01|253497|5|1|HSK63A(80)SK16-120U-IDU|Y
01|253497|5|2|HSK63A/80 SK16 120mm gauge length w/ID chip hole|Y
01|253497|5|3|Quoted at NET pricing|Y
01|253497|6|1|HSK63A(80)SK16-180U-IDU|Y
01|253497|6|2|HSK63A/80 SK16 180mm gauge length w/ID chip hole|Y
01|253497|6|3|Quoted at NET pricing|Y
01|253502|5|1|INSTALL IS A PER TABLE PRICE.|Y
01|253502|5|2|INSTALL INCLUDES CABLES SERVO AMPS AND INSTALL TIME|Y
01|253502|5|3|IF OPT TO NOT HAVE LN INSTALL CABLES AND SERVO AMPS|Y
01|253502|5|4|MUST BE PURCHASED SEPERATELY|Y
01|253502|6|1|AT TIME OF ORDER WE WILL NEED MACHINE MAKE/MODEL|Y
01|253502|6|2|MACHINE DATASHEET CONTROL MAKE/MODEL IMAGES OF|Y
01|253502|6|3|ELECTRICAL CABINET AND IMAGES OF CNC CONTROL|Y
01|253512|1|1|Includes Nikken control|Y
01|253512|2|1|Includes: Nikken control|Y
01|253515|1|1|1pc stock in IL|Y
01|253515|1|2|5pcs balance TBD|Y
01|253542|1|1|SPECIAL SHOW PRICING|Y
01|253552|1|1|1st Batch/For Stock 6/10:DWG FW'd to TimR|Y
01|253552|2|1|1st Batch/For stock|N
01|253552|3|1|1st Batch/S#1042932|N
01|253558|1|1|Please note these are considered special and have been|Y
01|253558|1|2|quoted at special net price. Once PO/order issued|Y
01|253558|1|3|these cannot be cancelled or returned.|Y
01|253572|1|1|Final Part# TBD **NET PRICE**  MIN ORDER QTY 5 PCS|Y
01|253572|1|2|CAT50 Shell Mill Holder 40mm CoolantPorts ChipHole 20K|Y
01|253572|1|3|w/ 6.00 Gauge Length|Y
01|253572|1|4|SPECIAL - CANNOT BE CANCELLED OR RETURNED|Y
01|253572|1|5|DELIVERY: Allow 1 Week design time plus 11-12 Wks for|Y
01|253572|1|6|mfg/shipping after customer signs approval drawing|Y
01|253595|1|1|Calibration Service and preventative maintenance on|Y
01|253595|1|2|E346+ Presetter SN:101268|Y
01|253595|1|3|Service performed on 9/3/2026|N
01|253595|2|1|On-Site Service Call ESTIMATE for Travel/Time/Labor|Y
01|253595|2|2|Travel: __ hours / Labor _ hours|N
01|253598|1|1|NC5-46-TB40-300 with PS-123E|Y
01|253598|1|2|NC5-46 Test Bar 40mmX300mm w/Wooden Case|Y
01|253598|1|3|Unit Price Each. SP Order Item. Non-cancellable after|Y
01|253598|1|4|PO receipt.|Y
01|253598|1|5|Lead Time: 4months (3.5mo mfg + Shipping 0.5mo)|Y
01|253611|3|1|Estimated Mid-September|Y
01|253614|14|1|Please note these are non-standard stock and considered|Y
01|253614|14|2|special. Once PO/order issued these can't be cancelled|Y
01|253614|14|3|or returned.|Y
01|253614|17|1|Please note these are non-standard stock and considered|Y
01|253614|17|2|special. Once PO/order issued these can't be cancelled|Y
01|253614|17|3|or returned.|Y
01|253618|1|1|Lead Time: 4months (2.5mo mfg + 1.5mo ship)|Y
01|253631|1|1|Final part number: CAT50-C1.1/4F-135U-IDU-M|Y
01|253637|1|1|SN:XXX EU:Signicast LLC|Y
01|253637|1|2|RGA#TAR-63122 CNCZ201LSA3|Y
01|253643|2|1|NBT40-C1F-70-M|Y
01|253643|2|2|NBT40 DualContact Milling Chuck 1.0 DIN_Mod 8K|Y
01|253643|3|1|Din Modification $50.00 net each included in the NET|Y
01|253643|3|2|price of the holder.|Y
01|253649|2|1|You can also use for 3/64|Y
01|253649|4|1|You can also use for 5/64|Y
01|253649|5|1|You can also use for 27/64|Y
01|253649|6|1|You can also use for 27/64 10.5mm and 11mm|Y
01|253649|7|1|You can also use for 31/64|Y
01|253656|1|1|RGA#LVR-63163/|Y
01|253656|1|2|Repair of MZMP5-ER40Z-ICE SN:2290024308 (Mim#131597)|Y
01|253656|2|1|Bearings seals o-rings and gears to be replaced|Y
01|253663|1|1|HSK100A-0500-6.00CP - HSK100A end mill holder 1/2|Y
01|253663|1|2|chip hole 25K w/ coolant ports. Please note this is|Y
01|253663|1|3|considered special and has been quoted at special net|Y
01|253663|1|4|price. Once PO/order isussed these cannot be cancelled|Y
01|253663|1|5|or returned.|Y
01|253667|4|1|We currently have 3pcs in IL stock.|Y
01|253667|4|2|Balance for 1pc 10-12wks|Y
01|253675|1|1|SN 101082|Y
01|253678|1|1|On-Site Inspection Package Midwest (Travel/1DayLabor/|Y
01|253678|1|2|/Expenses) Check-up service + Oil change|Y
01|253678|2|1|Check-up service + Oil change + *RT replacement work|Y
01|253679|1|1|FOR 2017 OKUMA GENOS L300-MYW A2-6/FB140|Y
01|253679|1|2|SPINDLE APP FORM RQR'D AT TIME OF ORDER.|Y
01|253679|2|1|MAIN SPINDLE NO LIMITS ON MAX THROUGH BORE CAP.|Y
01|253679|3|1|2-9/16 maximum dia.|Y
01|253679|3|2|MAIN SPINDLE|Y
01|253679|4|1|FOR SUB SPINDLE|Y
01|253679|4|2|SPINDLE VERIFICATION REQUIRED AT TIME OF ORDER|Y
01|253681|1|1|FOR MAKINO F5 SN:TBD  PRO6 FANUC W/ HIGH VOLTAGE|Y
01|253681|1|2|DRIVES AND MOTORS. ai?HV MOTORS|Y
01|253681|1|3|RIGHT SIDE TABLE MOUNT FACEPLATE CLOSEST TO OPERATOR|Y
01|253681|1|4|DOOR. DATA SHEETS AND E-PLAN RQR'D AT TIME OF P.O.|Y
01|253681|1|5|INTEGRATED BRAKE. <<RECOMMENDED FOR FUTURE TRUNNION|N
01|253681|1|6|WORK HOLDING LIKE TOMBSTONE OR DROP TRUNNION.|N
01|253681|3|1|RETROFIT HIGH VOLTAGE MOTOR ai4HV.|Y
01|253681|4|1|INCLUDES INSTALLATION PER MAKINO ENG. DOCS.|Y
01|253681|4|2|RIGHT SIDE TABLE ENTRY Y-AXIS WIRE DUCT.|Y
01|253681|4|3|ADDITIONAL AXIS EXPANSION REQUIRED BY MAKINO.|Y
01|253681|4|4|QUOTE ACCORDINGLY.|Y
01|253684|1|1|BuitIn5+1RJ + T-Slot FP|Y
01|253698|1|1|Overhaul/Repair|Y
01|253698|1|2|CNC400HFA-6+3.Serial#6091|Y
01|253698|1|3|RGA#TAR-63064|Y
01|253698|1|4|Ship to: Horizon Service|Y
01|253698|1|5|EU: Honda GA|Y
01|253698|1|6|Total Net Price of overhaul for the captioned RT|Y
01|253698|1|7|Worm Screw is re-used.|Y
01|253699|1|1|BUDGETARY QUOTE ONLY|Y
01|253699|1|2|WILL NEED MACHINE MAKE AND MODEL CONTROL MAKE/MODEL|Y
01|253699|1|3|IMAGES OF ELECTRICAL PANEL AND IMAGES OF CONTROL TO|Y
01|253699|1|4|DETERMINE EXACT PRICE AND IF THIS MODEL IS COMPATIBLE|Y
01|253712|1|1|HSK50E-SF0125-5.00 - HSK50E shrink fit holder 1/8|Y
01|253712|1|2|w/ 5 GL.|Y
01|253712|3|1|HSK50E-SF0250-5.00 - HSK50E shrink fit holder 1/4|Y
01|253712|3|2|w/ 5 GL.|Y
01|253738|1|1|Non-cancellable non-returnable after reciept of PO|Y
01|253741|1|1|SN:5142 EU:Stark Industrial LLC|Y
01|253741|1|2|RGA#TAR-63183 CNC202MA|Y
01|253742|4|1|BMT65-ER32Z-72-CCW|Y
01|253743|1|1|Final Part# TBD **NET PRICE** MOQ 5PCS|Y
01|253743|1|2|Customer Print CBN221301-01|Y
01|253743|1|3|SPECIAL - Non-cancellable / Non-returnable|Y
01|253743|2|1|Final Part# TBD **NET PRICE** MOQ 5PCS|Y
01|253743|2|2|Customer Print CBN221303-01|Y
01|253743|2|3|SPECIAL - Non-cancellable / Non-returnable|Y
01|253751|15|1|3/32|Y
01|253751|16|1|5/32|Y
01|253754|7|1|Delivery: 1-pc ETA to L-N 07-28 /3-pcs ETA to LN 09-27|Y
01|253755|1|1|FOR NOMURA DST-40L MITS M80 CONTROL|Y
01|253755|1|2|GOSIGER TO INSTALL.|Y
01|253755|1|3|L-N TO PROVIDE RT SUB-PLATE AND INSTALL KIT.|Y
01|253755|1|4|ELECTRICAL SCHEMATIC FOR MACHINE AT TIME OF ORDER.|Y
01|253755|1|5|LEFT SIDE MOUNT - A-AXIS CONFIG.|Y
01|253755|1|6|SEE DOVER CNC INSTALL FOR MORE INFO...|N
01|253755|2|1|CONVERT CNCZ180FA|N
01|253755|2|2|FOR NOMURA DST-40L LEFT SIDE MOUNT MOTOR TO REAR|Y
01|253755|2|3|SUB-PLATE REQUIRED.|Y
01|253755|3|1|MACHINE INSTALLATION KIT.|Y
01|253755|3|2|INCLUDES DRIVE CABLES INSTALLATION HARDWARE|Y
01|253755|3|3|TOOL BALANCE. INSTALLATION BY GOSIGER|Y
01|253755|3|4|MACHINE E-PLAN REQUIRED AT TIME OF ORDER.|Y
01|253755|4|1|1 T&J ALUMINUM PLATE TO POSITION RT ON MACHINE TABLE|Y
01|253755|4|2|REQUIRED DUE TO OVERHANG IN Y-AXIS.|Y
01|253756|1|1|Mimatic ER25 Wrench Part#196881|Y
01|253756|1|2|Universal Spindle Lock Wrench|Y
01|253756|1|3|Special non-standard stock: cannot be cancelled or|Y
01|253756|1|4|returned|Y
01|253766|1|1|Part Number TBD|Y
01|253766|1|2|QCFC65 Collet with 3/16 through hole.|Y
01|253766|1|3|Counterbore of .2498 by .140 deep with the undercut.|Y
01|253766|1|4|QUOTED AT NET PRICE|Y
01|253766|2|1|Part Number TBD|Y
01|253766|2|2|QCFC65 Collet with 3/16 through hole.|Y
01|253766|2|3|Counterbore of .2498 by .140 deep with the undercut.|Y
01|253766|2|4|QUOTED AT NET PRICE EACH|Y
01|253768|1|1|Discount reflects a PO of 1~10 tools.|Y
01|253768|2|1|Discount reflects a PO of 1~10 tools.|Y
01|253772|1|1|**non-cancellable non-returnable after receipt of PO**|Y
01|253772|2|1|**non-cancellable non-returnable after receipt of PO**|Y
01|253772|2|2|Lead time 1 week after receipt of spindle specs|Y
01|253782|1|1|IT50-SMS22-75|Y
01|253784|1|1|RGA#CUR-63083|Y
01|253784|1|2|Repair of C40RAM-ER32-180-65TP SN:2290666001|Y
01|253784|1|3|(Mim#178108)|Y
01|253784|2|1|Bearings seals o-rings worn flange and locating pin|Y
01|253784|2|2|to be replaced.|Y
01|253787|1|1|Final Part# HSK63A-CZF20-110|Y
01|253787|1|2|Special non-standard stock: cannot be cancelled or|Y
01|253787|1|3|returned|Y
01|253787|2|1|Special non-standard stock: Cannot be cancelled or|Y
01|253787|2|2|returned|Y
01|253793|5|1|Final part number: CAT40-C1.1/4SLF-105U-IDU-M|Y
01|253793|11|1|Final part number: C4007-0016-6.00DIN-M|Y
01|253793|13|1|Final Part Number: CAT40-C3/4F-85UG-IDU-DIN-M|Y
01|253793|15|1|Fina; part number: C4007-0016-2.25DIN-M|Y
01|253794|1|1|SN:10388 EU:GE Aerospace|Y
01|253794|1|2|RGA#TAR-63199 CNC202FA|Y
01|253797|7|1|M12x1.75 - 50mm L|Y
01|253797|7|2|precio por 10 piezas por bolsa|Y
01|253805|1|1|Calibration Service and preventative maintenance on|Y
01|253805|1|2|Sethy Six Presetter SN:6173|Y
01|253805|1|3|Service performed on|N
01|253805|2|1|On-Site Service Call ESTIMATE for Travel/Time/Labor|Y
01|253805|2|2|Travel: __ hours / Labor _ hours|N
01|253811|1|1|Final Part# CAT40-SK6F-120U-IDU-M  **NET PRICE**|Y
01|253811|1|2|CAT40 Slim Chuck SK6 ChipHole 20K W/ DIN HOLE MOD|Y
01|253811|1|3|Custom Tool - cannot be cancelled or returned|Y
01|253811|2|1|Final Part# CAT40-SK6F-120U-IDU-M  **NET PRICE**|Y
01|253811|2|2|CAT40 Slim Chuck SK6 ChipHole 20K W/ DIN HOLE MOD|Y
01|253811|2|3|Custom Tool - cannot be cancelled or returned|Y
01|253813|1|1|5 currently in stock around 2 months for remaining|Y
01|253813|1|2|pieces.|Y
01|253814|1|1|SN:1139 EU:Flex-Cell Precision Inc|Y
01|253814|1|2|RGA#TAR-63021 5AX-DD200BF2|Y
01|253828|1|1|FOR MAKINO F9. RIGHT SIDE MOUNT WITH TAILSTOCK.|Y
01|253828|1|2|RISER KIT FOR 20 SWING.|Y
01|253828|1|3|E-PLAN AND DATA SHEETS REQUIRED AT TIME OF ORDER|Y
01|253828|5|1|A36 RISERS FOR TAILSTOCK AND ROTARY TABLE TO SUPPORT|Y
01|253828|5|2|20 SWING.|Y
01|253843|1|1|RGA#LVR-63186/|Y
01|253843|1|2|Repair of MZQT47-ER32X-OFF-ICE SN:98907 05 (Mim#124259)|Y
01|253843|2|1|Bearings seals o-rings Output Spindle to be replaced|Y
01|253843|4|1|RGA#LVR-63186/|Y
01|253843|4|2|Repair of MZQT47-ER32X-OFF-C SN:30101 04 (Mim#124259)|Y
01|253843|5|1|Bearngs seals o-rings Input spindle Output spindle|Y
01|253843|5|2|to be replaced.|Y
01|253865|1|1|TNKQ2607-0875 0011|Y
01|253873|1|1|Quoted at NET pricing|Y
01|253873|2|1|NIT50-C32-105|Y
01|253873|2|2|Quoted at NET pricing|Y
01|253873|3|1|NIT50-C20-105|Y
01|253873|3|2|Quoted at NET pricing|Y
01|253873|6|1|QUOTED as ALTERNATIVE for NCAT50-C1.1/4-105U-IDU|Y
01|253873|9|1|C8-C3/4-90|Y
01|253873|9|2|Quoted as ALTERNTIVE for C8-C3/4-90-IDU|Y
01|253873|20|1|CCK25-5/8|Y
01|253877|1|1|Please note these are non-standard stock and considered|Y
01|253877|1|2|special. Once PO/order issued these can't be cancelled|Y
01|253877|1|3|or returned.|Y
01|253894|1|1|RGA#CUR-63213/|Y
01|253894|1|2|Repair of MRAM-ER25L-IC SN:6555901 (Mim#159991)|Y
01|253894|2|1|Bearings seals o-rings and output spindle to be|Y
01|253894|2|2|replaced|Y
01|253919|1|1|Please Note: Wrenches are included with this holder.|Y
01|253919|1|2|Delivery is based upon receipt of purchase order. This|Y
01|253919|1|3|tool is Special once a purchase order is placed it|Y
01|253919|1|4|cannot be cancelled or returned.|Y
01|253930|7|1|Currently 7 in stock in Illinois with the balance of|Y
01|253930|7|2|5 in stock at the factory. Estimated lead time is 2-3|Y
01|253930|7|3|weeks after receipt of an order.|Y
01|253930|9|1|Currenly have 1 stock in Illinois with the balance|Y
01|253930|9|2|currently available at the factory. Estimated lead time|Y
01|253930|9|3|is 2-3 weeks after receipt of an order.|Y
01|253938|1|1|Additional 20% Overstock Promo discount applied|Y
01|253938|1|2|Cannot be cancelled or returned upon receipt of a PO|Y
01|253946|1|1|Includes: AY0200 air/hyd booster.|Y
01|253967|2|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH AXIS|Y
01|253970|2|1|Quoted at NET price.|Y
01|253975|2|1|Quoted at NET price.|Y
01|253996|1|1|HSK63A End Mill Holder 16mm|Y
01|253996|1|2|HSK63A-SLS16-80|Y
01|253996|3|1|HSK100A End Mill Holder 16mm|Y
01|253996|3|2|HSK100A-SLS16-100|Y
01|253996|5|1|SK40 End Mill Holder 16mm|Y
01|253996|5|2|IT40-EN16-75|Y
01|253996|6|1|SK40 End Mill Holder 20mm|Y
01|253996|6|2|IT40-EN20-75|Y
01|254003|1|1|IT50-C20-105|Y
01|254003|1|2|Alternative for NIT50-C25-105|Y
01|254003|1|3|NET PRICING|Y
01|254003|2|1|Alternative for NIT50-C25-105|Y
01|254003|2|2|NET PRICING|Y
01|254003|3|1|Alternative for NIT50-C32-105|Y
01|254003|3|2|NET PRICING|Y
01|254003|6|1|QUOTED as ALTERNATIVE for NCAT50-C1.1/4-105U-IDU|Y
01|254003|9|1|Alternative for C8-C1-90|Y
01|254024|1|1|Pricing shows as Net price.|Y
01|254038|1|1|SN:3750 EU:XXX|Y
01|254038|1|2|RGA#TAR-63109 5AXZ-350FA-RCN2|Y
01|254038|39|1|Replating and Resurfacing of Rotary joints|Y
01|254038|39|2|P&D To Be Determined|Y
01|254058|1|1|**NET PRICE** Custom Special - cannot be cancelled|Y
01|254058|1|2|or returned upon receipt of a PO|Y
01|254085|1|1|1st Batch/S#1045408/Need to repackage|Y
01|254088|1|1|RGA#TOR-63212/|Y
01|254088|1|2|Repair of MCM5-1.1/4-U5/8|Y
01|254089|1|1|3 currently in stock and 4 months for manufacturing &|Y
01|254089|1|2|delivery of remaining pieces.|Y
01|254091|1|1|RGA#TOR-63212/|Y
01|254091|1|2|Repair of MCM5-1.1/4-U5/8|Y
01|254106|1|1|Straight Okuma LB4000 Live Tool ICE C4 Capto - please|Y
01|254106|1|2|note these are considered special and quoted at special|Y
01|254106|1|3|net price. Once PO/order issued these cannot be|Y
01|254106|1|4|cancelled or returned.|Y
01|254106|6|1|90dg Okuma LB4000 Live Tool ICE C4 Capto - please|Y
01|254106|6|2|note these are considered special and quoted at special|Y
01|254106|6|3|net price. Once PO/order issued these cannot be|Y
01|254106|6|4|cancelled or returned.|Y
01|254107|1|1|HSK100A-HC10-150|Y
01|254107|1|2|HSK100A Hydraulic Chuck 10 mm GL 150 mm|Y
01|254110|2|1|DCNA - Overstock 20% off|Y
01|254110|2|2|List = $1043|Y
01|254132|1|1|2pcs stock - 5pcs stock balance 3pcs pending|Y
01|254138|1|1|Final Part# NCAT40-MMC8C-125U-AT-IDU  **NET PRICE**|Y
01|254138|1|2|Dual Contact NCAT40 MMC Mini Chuck 10mm DrawBar Coolant|Y
01|254138|1|3|ChipHole 30K|Y
01|254138|2|1|Final Part# NCAT40-MMC8C-125U-AT-IDU  **NET PRICE**|Y
01|254138|2|2|Dual Contact NCAT40 MMC Mini Chuck 10mm DrawBar Coolant|Y
01|254138|2|3|ChipHole 30K|Y
01|254138|3|1|Final Part# NCAT40-MMC8C-125U-AT-IDU  **NET PRICE**|Y
01|254138|3|2|Dual Contact NCAT40 MMC Mini Chuck 10mm DrawBar Coolant|Y
01|254138|3|3|ChipHole 30K|Y
01|254142|1|1|TC VALUE FOR QT# 254019|Y
01|254142|1|2|C/O MATT SIMPSON - GOSIGER CLEVELAND|Y
01|254151|1|1|#71 NH501R166 Dial Scale|Y
01|254151|2|1|#72 NH501R168 Scale Plate|Y
01|254151|3|1|#75 NH501R155 T-Slot Cover|Y
01|254151|4|1|#110 NH501R158 Round Nut|Y
01|254151|5|1|#112 Bevel Gear|Y
01|254151|6|1|#113 Gear Shaft|Y
01|254151|7|1|#114 Distance Collar|Y
01|254151|8|1|#116 NH501R161 Stopper Bolt|Y
01|254151|9|1|#122 Winding Blade|Y
01|254160|3|1|RPLC for I#995/00(under-ship)|Y
01|254160|3|2|7/30/26RY:ETA8/3?DHL(I#1024/00 NCV)|Y
01|254163|1|1|FOR HURCO TM8i A2-6 SPINDLE NOSE|Y
01|254163|1|2|DRAWTUBE VERIFICATION REQUIRED AT TIME OF ORDER.|Y
01|254172|1|1|NIKKEN PART# BT45S-FM30-47-RP|Y
01|254203|1|1|If an order is placed by 8/4 delivery will be 2 weeks|Y
01|254203|1|2|If placed after 8/4 delivery will be end of August|Y
01|254203|1|3|This is a non-standard stock item and considered|Y
01|254203|1|4|special.  Once a PO has been issued this item|Y
01|254203|1|5|cannot be cancelled or returned.|Y
01|254203|6|1|Available to ship end of August|Y
01|254203|7|1|If an order is placed by 8/4 delivery will be 2 weeks|Y
01|254203|7|2|If placed after 8/4 delivery will be end of August|Y
01|254203|8|1|If an order is placed by 8/4 delivery will be 2 weeks|Y
01|254203|8|2|If placed after 8/4 delivery will be end of August|Y
01|254203|10|1|If an order is placed by 8/4 delivery will be 2 weeks|Y
01|254203|10|2|If placed after 8/4 delivery will be end of August|Y
01|254203|11|1|If an order is placed by 8/4 delivery will be 2 weeks|Y
01|254203|11|2|If placed after 8/4 delivery will be end of August|Y
01|254203|13|1|Available to ship end of August|Y
01|254203|14|1|If an order is placed by 8/4 delivery will be 2 weeks|Y
01|254203|14|2|If placed after 8/4 delivery will be end of August|Y
01|254203|16|1|If an order is placed by 8/4 delivery will be 2 weeks|Y
01|254203|16|2|If placed after 8/4 delivery will be end of August|Y
01|254203|17|1|If an order is placed by 8/4 delivery will be 2 weeks|Y
01|254203|17|2|If placed after 8/4 delivery will be end of August|Y
01|254209|1|1|Please allow 5 weeks delivery for 1 piece and 10 weeks|Y
01|254209|1|2|delivery on remaining balance. These are considered|Y
01|254209|1|3|special and have been quoted at special net price. Once|Y
01|254209|1|4|PO/order issued these cannot be cancelled or returned.|Y
01|254211|1|1|Lead time 14~16 weeks from ARO|Y
01|254211|1|2|This is a non-standard stock item and considered|Y
01|254211|1|3|special.  Once a PO has been issued this item|Y
01|254211|1|4|cannot be cancelled or returned.|Y
01|254220|1|1|New replacement for old part# HW-O8-KS-A6|Y
01|254220|1|2|HW-08-KS2-A6 through hole diameter icnreased by 1mm|Y
01|254220|1|3|Additional drilled and tapped holes added to face of|Y
01|254220|1|4|chuck and pilot bushing specifications mounting|Y
01|254220|1|5|dimmensions for the machine & jaws remain the same|Y
01|254220|2|1|LN can thread the draw nut for additional charge upon|Y
01|254220|2|2|receipt lathe spindle information|Y
01|254220|7|1|LN can thread the draw nut for additional charge|Y
01|254220|7|2|upon receipt lathe spindle information|Y
01|254221|1|1|Back Spot Facing Tool 1.25|Y
01|254221|2|1|Back Spot Facing Tool 1.4375|Y
01|254226|5|1|Please note we currently have only 1 piece left of this|Y
01|254226|5|2|special. Once PO/order issued these cannot be|Y
01|254226|5|3|cancelled or returned.|Y
01|254229|3|1|If an order is placed by 8/4 delivery will be 2 weeks|Y
01|254229|3|2|If placed after 8/4 delivery will be end of August|Y
01|254246|1|1|P.O. Number: 21687136|Y
01|254246|2|1|P.O. Number: 21669587|Y
01|254246|3|1|P.O. Number: 21698426|Y
01|254256|4|1|BT40-SK16-105P|Y
01|254258|1|1|No Inspection Required.|Y
01|254261|4|1|BT40-SK16-105P|Y
01|254262|4|1|BT40-SK16-105P|Y
01|254264|1|1|Req.INS/Install E16-NUT & ER16-SCREW(C)|Y
01|254264|2|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|254264|3|1|Req.INS/S3/4-16X11/16(2) Old#C8-1250-9.84 S#1039184|Y
01|254272|1|1|$20K list price certificate|Y
01|254281|1|1|RGA#LVR-63207/|Y
01|254281|1|2|Repair of MZQT5-CT40X-OFF SN:32494 01 (Mim#131538)|Y
01|254281|2|1|Bearings seals and o-rings ro be replaced|Y
01|254286|1|1|HSK100A-SK13C-200|Y
01|254286|3|1|HSK100A-SK13C-250|Y
01|254290|1|1|RGA#LVR-63245/|Y
01|254290|1|2|Repair of BMT45-ER25X SN:9222010 (Mim#176867) declined|Y
01|254301|7|1|M12x1.75 - 50mm L|Y
01|254301|7|2|precio por 10 piezas por bolsa|Y
01|254304|5|1|Installatione at no charge.|Y
01|254311|1|1|**Cannot be cancelled or returned after receipt|Y
01|254311|1|2|of order**|Y
01|254316|2|1|2pcs are available in IL stock|Y
01|254316|2|2|Balance of 4pcs 10-12 week lead time ARO|Y
01|254318|3|1|BT30-C16-70|Y
01|254318|3|2|BT30 Milling Chuck 16mm GL 70mm|Y
01|254318|3|3|NET Price Each.|Y
01|254318|8|1|BT30-SK13-60|Y
01|254318|8|2|BT30 Slim Chuck SK13|Y
01|254324|1|1|ZMK16-14|Y
01|254324|1|2|ZMK16 PositiveDrive RigidTap Collet|Y
01|254330|1|1|Delivery Early September|Y
01|254342|1|1|Req.INS/Install E32-NUT & ER32-SCREW(C)|Y
01|254342|2|1|Req.INS/Install S7/16-20X3/8|Y
01|254342|3|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|254342|4|1|Req.INS/Install (2)S3/4-16X11/16|Y
01|254342|5|1|Req.INS/Install E25-NUT & ER25-SCREW(C)|Y
01|254342|6|1|Req.INS/Install SKN-10K/S#1037879/SoCal|Y
01|254342|7|1|Req.INS/Install SKN-10K/S#1037879/SoCal|Y
01|254342|8|1|Req.INS/Install E16-NUT-G & ER16-SCREW(C)|Y
01|254369|1|1|Non-standard stock - Cannot be cancelled or returned|Y
01|254369|1|2|upon receipt of order|Y
01|254369|2|1|Non-standard stock - cannot be cancelled or returned|Y
01|254369|2|2|upon receipt of order|Y
01|254370|1|1|100 Axis in total. It will require 3 technicians 3 days|Y
01|254370|1|2|this will include travel labor hotel and per diem|Y
01|254370|1|3|for 3 people. NOTE: This will be subject to additional|Y
01|254370|1|4|cost if there are other issues that are identified|Y
01|254370|1|5|during the checkup.|Y
01|254370|1|6|Advics Manufacturing Ohio Inc.|Y
01|254370|1|7|1650 Kingsview Dr Lebanon OH 45036|Y
01|254378|1|1|Pricing is Net price.|Y
01|254380|1|1|**Cannot be cancelled or returned upon receipt of|Y
01|254380|1|2|order**|Y
01|254387|1|1|This is a non-standard stock item|Y
01|254387|1|2|and considered special. Once a PO has been issued|Y
01|254387|1|3|this item cannot be cancelled or returned.|Y
01|254388|2|1|Nikken Part# HSK63A-SK16C-200|Y
01|254392|1|1|THIS QUOTE CONTAINS PRODUCTS AND SERVICES TO|Y
01|254392|1|2|RETROFIT KELCOR'S EXISTING 5AX-201YA-M|Y
01|254392|1|3|TO A FANUC BASED CONTROL 5AX-201FA-M.|Y
01|254392|1|4|NO ADDITIONAL WARRANTY IS IMPLIED UNLESS CUSTOMER|Y
01|254392|1|5|ELECTS TO HAVE TABLE FULLY INSPECTED REFRESHED|Y
01|254392|1|6|CONVERTED AT THE SAME TIME.|Y
01|254392|1|7|STANDARD MACHINE INSTALLATION RATES APPLY SINCE WE|Y
01|254392|1|8|WILL BE PROVIDING NEW DRIVES AND MACHINE SIDE|Y
01|254392|1|9|INTERFACE CABLES AND DRIVE COMMISSIONING.|Y
01|254392|14|1|CONVERSION LABOR - MUNDELEIN IL.|Y
01|254392|15|1|NEED MACHINE MODEL SERIAL AND FANUC DATA SHEETS|Y
01|254392|15|2|AT THE TIME OF ORDER.|Y
01|254397|4|1|Balance of 18pcs available to ship in November|Y
01|254399|1|1|**NET PRICE**|Y
01|254399|1|2|Special - cannot be cancelled or returned upon|Y
01|254399|1|3|receipt of an order|Y
01|254408|1|1|SN:6272 EU:Quality Machining & Design Inc.|Y
01|254408|1|2|RGA#TAR-63184 5AX-201FA-M|Y
01|254423|1|1|Tax is included in price above|Y
01|254424|1|1|This item is a special-net pricing|Y
01|254427|1|1|Mesa para presetter E356|Y
01|254427|1|2|Completamente armada|Y
01|254427|1|3|Minimo detalle de pintura de acuerdo a fotos enviadas|Y
01|254429|1|1|Delivery is 15~16 weeks after receipt of PO. Please|Y
01|254429|1|2|allow 4 weeks for the drawing process. Once a purchase|Y
01|254429|1|3|order is placed it cannot be cancelled or returned.|Y
01|254437|4|1|B5016-1250B has a 6 gage length.|Y
01|254437|5|1|Please Note: B5001-0750-6.00CP is a Special and|Y
01|254437|5|2|there may be a minimum requirment and new pricing.|Y
01|254437|5|3|Please advise if you want a quote. Thank you|Y
01|254464|2|1|Please note additional 20% applied per overstock promo.|Y
01|254464|2|2|Once PO/order issued these cannot be cancelled or|Y
01|254464|2|3|returned. This will need to be requoted for price &|Y
01|254464|2|4|availability per stock depletion.|Y
01|254475|1|1|The service includes an oil change and the oil will be|Y
01|254475|1|2|supplied by Suncall America.|Y
01|254485|1|1|SN:6272 EU:Quality Machining & Design Inc.|Y
01|254485|1|2|RGA#TAR-63184 5AX-201FA-M|Y
01|254490|1|1|1 stock 5 set for late September.|Y
01|254490|2|1|1 stock 3 set for late September and 2 TBD.|Y
01|254493|2|1|Quoted at Net and non-returnable.|Y
01|254499|4|1|Delivery end of August|Y
01|254499|5|1|Delivery end of August|Y
01|254499|5|2|This is a non-standard stock item and considered|Y
01|254499|5|3|special. Once a PO has been issued this item cannot|Y
01|254499|5|4|be cancelled or returned.|Y
01|254504|4|1|EXTERNAL POWER & FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|254508|1|1|P-170S - need live center only|Y
01|254514|2|1|Special - Non Returnable|Y
01|254514|18|1|Special - Non Returnable|Y
01|254516|39|1|SK25-8P   SK25 Slim Chuck Collet 8.0-7.5mm Precision|Y
01|254516|41|1|SK25-12P  SK25 Slim Chuck Collet 12.0-11.5mm Precision|Y
01|254516|42|1|SK25-16P  SK25 Slim Chuck Collet 16.0-15.5mm Precision|Y
01|254516|69|1|KM25-5/16|Y
01|254516|69|2|Straight Collet/Sleeve OD 25mm ID 5/16 Large Chamfered|Y
01|254516|69|3|Edge|Y
01|254516|70|1|KM25-7/16|Y
01|254516|70|2|Straight Collet/Sleeve OD 25mm ID 7/16 Large Chamfered|Y
01|254516|70|3|Edge|Y
01|254534|1|1|Shell mill holder|Y
01|254534|1|2|CAT40 d=22mm|Y
01|254534|1|3|L=150mm|Y
01|254540|1|1|This is a non-standard stock item and considered|Y
01|254540|1|2|special. Once a PO has been issued this item cannot|Y
01|254540|1|3|be cancelled or returned.|Y
01|254550|3|1|HSK100A-SK13C-250|Y
01|254552|1|1|Calibration Service and Preventative Maintenance on|Y
01|254552|1|2|E346+ Presetter SN:100902|Y
01|254552|1|3|Service performed on __|N
01|254552|2|1|On-Site Service Call ESTIMATE for Travel/Time/Labor|Y
01|254552|2|2|Travel: _ hours / Labor: _ hours|N
01|254553|1|1|Additional 20% Overstock Promo discount applied|Y
01|254553|1|2|**non-cancellable non-returnable**|Y
01|254553|2|1|Additional 20% Overstock Promo discount applied|Y
01|254553|2|2|**Non-cancellable non-returnable**|Y
01|254557|4|1|BT40-SK16-105P|Y
01|254568|1|1|This holder does not have the chip hole. Please check|Y
01|254568|1|2|with your customer to see if they require this. We can|Y
01|254568|1|3|add the chip hole in house to the holders at no charge.|Y
01|254568|1|4|If chip hole is required we can ship in one week.|Y
01|254568|2|1|This holder has the chip hole.|Y
01|254572|39|1|SK25-8P   SK25 Slim Chuck Collet 8.0-7.5mm Precision|Y
01|254572|41|1|SK25-12P  SK25 Slim Chuck Collet 12.0-11.5mm Precision|Y
01|254572|42|1|SK25-16P  SK25 Slim Chuck Collet 16.0-15.5mm Precision|Y
01|254572|69|1|KM25-5/16|Y
01|254572|69|2|Straight Collet/Sleeve OD 25mm ID 5/16 Large Chamfered|Y
01|254572|69|3|Edge|Y
01|254572|70|1|KM25-7/16|Y
01|254572|70|2|Straight Collet/Sleeve OD 25mm ID 7/16 Large Chamfered|Y
01|254572|70|3|Edge|Y
01|254578|19|1|Only seeing a 4 gage length versus 6 requested.|Y
01|254578|20|1|Only seeing a 4 gage length versus 6 requested.|Y
01|254578|37|1|Offered without coolant ports - if they're needing CPs|Y
01|254578|37|2|we have NC5006-1000-6.00CP as the closest gage length.|Y
01|254578|40|1|Closest option off the shelf is 6 gage length option.|Y
01|254593|1|1|For L/N Showroom.|Y
01|254593|1|2|8/10/26RY:9/8B(#1003/00). ToDo:Notify EricH.|Y
01|254599|2|1|Please Note: Once the draw screw is modified to|Y
01|254599|2|2|customers specifications it is not returnable.|Y
01|254621|1|1|Discount reflects a PO for 1 to 6 holders.|Y
01|254621|2|1|Discount reflects a PO for 7 to 13 holders.|Y
01|254621|3|1|Discount reflects a PO for 14 to 20 holders.|Y
01|254632|1|1|Discount reflects a PO for 7 to 13 holders.|Y
01|254632|3|1|Discount reflects a PO for 14 to 20 holders.|Y
01|254646|2|1|AIR/HYDRAULIC BOOSTER PUMP FOR BRAKE SYSTEM|Y
01|254646|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR OKUMA MILLAC|Y
01|254647|3|1|EXTERNAL POWER/FEEDBACK CABLES FOR OKUMA MILLAC|Y
01|254671|1|1|Includes face plate special pricing.|Y
01|254694|2|1|This is a non-standard stock item and considered|Y
01|254694|2|2|special.  Once a PO has been issued this item cannot|Y
01|254694|2|3|be cancelled or returned.|Y
01|254694|3|1|This is a non-standard stock item and considered|Y
01|254694|3|2|special. Once a PO has been issued this item cannot|Y
01|254694|3|3|be cancelled or returned.|Y
01|254694|4|1|This is a non-standard stock item and considered|Y
01|254694|4|2|special. Once a PO has been issued this item cannot|Y
01|254694|4|3|be cancelled or returned.|Y
01|254697|3|1|Quoted at Net Price.|Y
01|254698|1|1|This item is non standard stock. Once a purchase order|Y
01|254698|1|2|is placed it cannot be cancelled or returned.|Y
01|254718|22|1|**NET PRICE**|Y
01|254718|22|2|Special - cannot be cancelled or returned upon receipt|Y
01|254718|22|3|of a PO|Y
01|254724|1|1|This is a non-standard stock item and considered|Y
01|254724|1|2|special. Once a PO has been issued this item cannot be|Y
01|254724|1|3|cancelled or returned.|Y
01|254727|1|1|START2 less than 6 months old. Replacing blown fuses.|Y
01|254729|1|1|Please note these are non-standard stock and considered|Y
01|254729|1|2|special. Once PO/order issued these can't be cancelled|Y
01|254729|1|3|or returned.|Y
01|254731|3|1|NK32-28|Y
01|254734|1|1|Shell mill holder|Y
01|254734|1|2|CAT40 d=22mm|Y
01|254734|1|3|L=150mm|Y
01|254750|1|1|3 WEEKS ARO|Y
01|254750|2|1|4th and 5th axis power and feedback cables|Y
01|254771|1|1|REPLACEMENT TABLE FOR SN: 5140|Y
01|254771|1|2|WE CANNOT TEST RUN MITSUBISHI HC MOTORS.|Y
01|254771|1|3|WE CAN PROVIDE NEW MOTOR QUOTE AND OR REMOVE|Y
01|254771|1|4|CURRENT MOTOR FROM #5140 AND REINSTALL.|Y
01|254771|1|5|MAZAK TABLE WIRING ADDED TO QUOTE.|Y
01|254771|1|6|SELF-INSTALL|Y
01|254771|2|1|MAZAK SPEC TABLE INTERFACE WIRING. INSIDE TABLE|Y
01|254771|2|2|ONLY. CUSTOMER TO REUSE EXISTING CABLES.|Y
01|254784|1|1|SN:5312 EU:GCH Tool|Y
01|254784|1|2|RGA#TAR-63239 CNC400-503TFA-255-10-HP|Y
01|254802|1|1|**Cannot be cancelled or returned upon receipt of PO|Y
01|254802|12|1|**Cannot be cancelled or returned upon receipt of PO|Y
01|254805|6|1|Machine must have 4th and 5th axis softwate option|Y
01|254805|6|2|turned on.|Y
01|254805|6|3|Machine must have ladder for 4th and 5th axis|Y
01|254805|7|1|Included with installation|Y
01|254805|8|2|Included with installation|Y
01|254805|9|1|Included with installation|Y
01|254805|10|1|Included with installation|Y
01|254821|1|1|We currently have 2pcs available in stock|Y
01|254821|1|2|This is a non-standard stock item and considered|Y
01|254821|1|3|special. Once a PO has been issued this item cannot|Y
01|254821|1|4|be cancelled or returned.|Y
01|254827|1|1|SN:6217 EU:XXX|Y
01|254827|1|2|RGA#TAR-63153 CNC400HFA-6P+3P|Y
01|254843|1|1|**Net price** Special non-standard stock- cannot be|Y
01|254843|1|2|cancelled or returned upon receipt of order|Y
01|254846|1|1|DELIVERY: 47PCS STOCK BALANCE PENDING|Y
01|254846|2|1|Special - **NET PRICE** Cannot be cancelled or returned|Y
01|254846|2|2|after receipt of order.|Y
01|254846|3|1|DELIVERY: 14pcs STOCK 27pcs 2 Wks 50pcs PENDING|Y
01|254846|3|2|BALANCE PENDING|Y
01|254846|5|1|DELIVERY: ~200 PCS 1-2 WKS BALANCE 14-16 WKS|Y
01|254846|6|1|DELIVERY: ~200 PCS 1-2 WKS BALANCE 14-16 WKS|Y
01|254846|7|1|DELIVERY: ~200 PCS 1-2 WKS BALANCE 14-16 WKS|Y
01|254846|8|1|DELIVERY: ~100 PCS 1-2 WKS BALANCE 14-16 WKS|Y
01|254846|9|1|DELIVERY: ~100 PCS 1-2 WKS BALANCE 14-16 WKS|Y
01|254846|10|1|DELIVERY: 63 PCS STOCK BALANCE 14-16 WKS|Y
01|254846|11|1|DELIVERY: 39 PCS STOCK BALANCE 14-16 WKS|Y
01|254846|12|1|DELIVERY: ~100 PCS 1-2 Wks BALANCE 14-16 WKS|Y
01|254846|13|1|DELIVERY: 27 PCS STOCK BALANCE 2 WKS|Y
01|254846|14|1|DELIVERY: 22 PCS STOCK BALANCE 14-16 WKS|Y
01|254846|15|1|DELIVERY: 52 PCS STOCK BALANCE 2 WKS|Y
01|254846|16|1|DELIVERY: 42 PCS STOCK BALANCE 2 Wks|Y
01|254846|17|1|DELIVERY: 18 PCS STOCK BALANCE 2 WKS|Y
01|254846|18|1|DELIVERY: 1188 PCS STOCK 540 PCS 9/30 BALANCE PENDING|Y
01|254846|19|1|DELIVERY: 2 PCS STOCK BALANCE 3-4 WKS|Y
01|254865|1|1|NK32-MT2-15 / INCQ2608-0579 0001|Y
01|254865|3|1|INCQ2608-0579 0006|Y
01|254869|1|1|IT50-MTB5-105|Y
01|254869|2|1|IT50-MTB5-125|Y
01|254874|1|1|Discontinued - 1 PC LEFT|Y
01|254874|1|2|Additional 20% Overstock Promo discount applied|Y
01|254874|1|3|Non-cancellable / Non-returnable|Y
01|254874|4|1|Final Part# C5007-0020-6.00DIN-M  **NET PRICE**|Y
01|254874|4|2|Custom Modified Tool - Cannot be cancelled or returned|Y
01|254881|8|1|Quoted at NET price.|Y
01|254883|1|1|Includes collet sizes: SK16-1/4A SK16-3/8A SK16-1/2A|Y
01|254917|1|1|SN:5960 EU:Libra Industries|Y
01|254917|1|2|RGA#TAR-63167 5AX-201YA-M|Y
01|254918|1|1|196440 - BMT55 Nakamura live tool|Y
01|254918|3|1|196438 - BMT55 Nakamura live tool|Y
01|254918|5|1|BMT55 Nakamura live tool special - similar to Mimatic|Y
01|254918|5|2|196438 only with ER25 output|Y
01|254921|1|1|Net price includes the following parts for assembly|Y
01|254921|1|2|at Lyndex-Nikken: HSK63-TubeSKN-6WKJ(GH) SKG6-6HG-J|Y
01|254921|1|3|customer's supplied RFID chip and holder re-balanced.|Y
01|254921|2|1|Net price includes the following parts for assembly|Y
01|254921|2|2|at Lyndex-Nikken: HSK63-Tube SKN-16BJ(GH) SKG16-10HGJ|Y
01|254921|2|3|customer's supplied RFID chip and holder re-balanced.|Y
01|254921|3|1|Net price includes the following parts for assembly|Y
01|254921|3|2|at Lyndex-Nikken: HSK63-TubeSKN-25BJ(GH)SKG25-18HGE-J|Y
01|254921|3|3|and customers RFID chips. Holders to be re-balanced.|Y
01|254953|9|1|UPS Ground ESTIMATED Shipping Charge|Y
01|254964|1|1|ATC-ALIGN-HSK50A|Y
01|254964|1|2|ATC Alignment Tool Set HSK50A|Y
01|254964|1|3|SP Order. Unit Price Each.|Y
01|254964|1|4|Lead Time: 2-3weeks|Y
01|254968|2|1|NCAT40-CZF32-120U-IDU|Y
01|254968|2|2|2Lock CAT40 BullsEye ZeroFit Milling Chuck C32 ChipHole|Y
01|254968|2|3|SP Order Item. Unit Price Each. Cancellations are not|Y
01|254968|2|4|accepted after the PO has been received.|Y
01|254975|4|1|CAT50-SF14-80CP - CAT50 Shrink Fit Holder 14mm 80mm GL|Y
01|254994|3|1|HAAS Motor|Y
01|254996|2|1|Non-cancellable/Non-returnable after receipt of PO|Y
01|254996|7|1|Non-cancellable/Non-returnable after receipt of PO|Y
01|254996|12|1|Non-cancellable/Non-returnable after receipt of PO|Y
01|254996|17|1|Non-cancellable/Non-returnable after receipt of PO|Y
01|254997|6|1|I have requested price and delivery with factory.|Y
01|255025|2|1|Quoted at NET price.|Y
01|255025|2|2|The positioning block will need to be designed for the|Y
01|255025|2|3|Kitamura.Part number MODIFICATION-PB-SP lead time one|Y
01|255025|2|4|week after design is finalized and approved.|Y
01|255026|1|1|NCAT40-SF0500-3.15MT|Y
01|255026|1|2|NCAT40 DualContact Shrink Fit Holder 1/2 Mold Type 25K|Y
01|255026|1|3|This is a non-standard stock item and considered|Y
01|255026|1|4|special. Once a PO has been issued this item cannot be|Y
01|255026|1|5|cancelled or returned.|Y
01|255056|1|1|FOR HAAS VF2SSYT SN:1087595 RETROFIT|N
01|255056|1|2|SW: 18.28 CONFIRMED CHC CONTROL|N
01|255056|1|3|HFO TO PROVIDE INSTALLATION LABOR AND SERVO DRIVES|N
01|255056|1|4|REPLACEMENT TABLE FOR REPAIR QT#254917|Y
01|255064|5|1|special- included in price of purchase or RT|Y
01|255065|3|1|CONTAINS FULL INSTALLATION KIT; DOES NOT INCLUDE LN|Y
01|255065|3|2|PHYSICALLY INSTALLING THE TABLE. METHODS WILL INSTALL|Y
01|255065|3|3|THE TABLE USING OUR KIT.|Y
01|255066|2|1|4 PORT ROTARY JOINT FOR THRU SPINDLE PNEUMATICS|Y
01|255066|3|1|ADAPTER PLATE FOR WORKHOLDING|Y
01|255066|4|1|EXTERNAL POWER/FEEDBACK CABLES FOR 4TH/5TH AXES|Y
01|255066|7|1|90MM RISER TO BE BUILT BY MARTIN TRUNNION|Y
01|255066|7|2|TO SIT BENEATH 5AX-130FA-M ROTARY TABLE|Y
01|255066|8|1|A tariff surcharge may be added to this quotation in|Y
01|255066|8|2|the event of a sustained tariff increase on the|Y
01|255066|8|3|importation of this product.  Any surcharge will be|Y
01|255066|8|4|disclosed prior to acceptance of an order.|Y
01|255081|1|1|MSC#39351408|Y
01|255087|1|1|Includes:|Y
01|255087|1|2|3x NBT30-SK13C-60|Y
01|255087|1|3|1x 016-SPAN|Y
01|255087|1|4|1x SK13-1/8A|Y
01|255087|1|5|1x SK13-1/4A|Y
01|255087|1|6|1x SK13-3/8A|Y
01|255087|1|7|1x SK13-1/2A|Y
01|255087|1|8|3x B30-6000-EU|Y
01|255087|1|9|1x Case w/ Foam Insert|Y
01|255088|1|1|#A197584|Y
01|255088|2|1|#A190565|Y
01|255141|1|1|FOR DT-2. HFO INSTALL 2 UNITS ON ORDER DUE 10/30/26|Y
01|255141|2|1|HFO  Midwest to supply Yaskawa Sigma 7 motors.|Y
01|255141|2|2|Motors to be shipped to Mundelein for assembly|Y
01|255141|2|3|HFO responsible for field installation|Y
01|255141|2|4|Duplicate project for export to MX|N
01|255141|2|5|SHIPMENT INSTRUCTIONS FOR SIGMA MOTORS...|Y
01|255141|2|6|SHIP TO: LYNDEX-NIKKEN|Y
01|255141|2|7|ATTN: RT_ENG. REF# YOUR PO#|Y
01|255141|2|8|1468 ARMOUR BLVD.|Y
01|255141|2|9|MUNDELEIN IL  60060|Y
01|255155|2|1|SABR3 hardware will be included|Y
01|255155|3|1|SABR3 hardware will be included|Y
01|255173|1|1|Includes:|Y
01|255173|1|2|3x NBT30-SK13C-60|Y
01|255173|1|3|1x 016-SPAN|Y
01|255173|1|4|1x SK13-1/8A|Y
01|255173|1|5|1x SK13-1/4A|Y
01|255173|1|6|1x SK13-3/8A|Y
01|255173|1|7|1x SK13-1/2A|Y
01|255173|1|8|3x B30-6000-EU|Y
01|255173|1|9|1x Case w/ Foam Insert|Y
01|255182|1|1|*Non-coolant|Y
01|255182|2|1|*Non-coolant|Y
